HomeMy WebLinkAboutNorthstar - Hilcorp Alaska, LLCSTATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Facility Name
6. Sold
0
7. Reinjected
17,730,369
8. Flared or vented 1 hour or less
14
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
560,286
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
18,296,155
15. NGL Gas Equivalent
0
16. Purchased gas:
0
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing
:envy that the foregoing is true and correct to the best of my knowledge.
e"`""'
Signature 3& yt&
0
71
20. For
>1 hr:
Name
Total
Use
iry 2018
as a percent
lots: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
1. Facility Number
0290000025
2. Facility Name
1 Northslar
3. Field
Northstar
4. Operator
I HILCORP ALASKA LLC
5. Month/Year of Disposition
I February 2018
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
S. Sold
0
Pool Name Pool Code Percent
7. Reinjected
13,458,283
NORTHSTAR, NORTHSTAR OIL 590100 70.54
NORTHSTAR, NORTHSTAR-KUPARUK OIL POOL 590150 29.46%
8. Flared or vented 1 hour or less
5,093
9. Flared or vented more than 1 hour (see instr.)
537
10. Pilot and Purge
4,955
11. Assist Gas
0
12. Fuel gas used in lease operations
441,435
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
>
x %'j5h
Safely
✓
MCF
14. TOTAL VOLUME (ITEMS 6-13)
13,910,303
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas:
0
Waste:
MCF
17. Transferred from: (Off -lease Gas)
0
n
P / 3-2-2-18
/ Commissioner Date
18. Transferred to:
0
Note: All volumes must be corrected to
Analyst pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
19. Remarks:
Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
/� J_ f7L� /L
Signature a l',�/' CLG .7C(.[.l� & Title Production
AOGCC Excess Flare Report
February -2018
NORTHSTAR — NSU GATHERING
Ending
RptDate
OpNo
FacilityNo
Date Flared
StartTime
Time
End Date
Planned
MCF Description of Flaring Event
Action Taken to Minimize Volume
J
EXCESS FLARING DUE TO THE LP SCRUBBER
EXCESS FLARING NECESSARY UNTIL PLANT
GOING DOWN DURING STATE VALVE TESTING
IS STABILIZED AND LP IS RESTARTED.
2/1/2018
124250
0290000025
2/17/2018
14:51:00
17:00:00
2/17/2018
U
312 DUE TO PROCESS PRESSURE UPSET IN
PLANT.
EXCESS FLARING DUE TO A CRACK IN THE
EXCESS FLARING NECESSARY UNTIL PLANT
ENGINE CASE OF HP -B RESULTING IN THE
CAN BE RESTARTED.
2/1/2018
124250
0290000025
2/27/2018
205200
22:05:00
2/27/2018
U
224 SHUTDOWN OF THE UNIT AND THE ENTIRE
PLANT.
537
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Facility Number
0290000025
2. Facility Name
1 Northstar
3. Field
N(
Disposition
Volume MCF
Sold
0
Reinjected
13,970,511
Flared or vented 1 hour or less
9,632
Flared or vented more than 1 hour (see instr.)
20,809
Pilot and Purge
5,486
Assist Gas
0
Fuel gas used in lease operations
442,883
Other (see instructions)
0
TOTAL VOLUME (ITEMS 6-13)
14,449,321
NGL Gas Equivalent
0
Purchased gas:
1,141
Transferred from: (Off -lease Gas)
0
Transferred to:
0
Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,141
Signature " Title
20. For production from multiple pools, list contribution of each pool as a percent of
Oficial Use Only
Authorization >1 hr:
Safety
/-
MC r
Lease Use
MCF
Conservation
MCF
Waste:
MCF
E�yc .�1---� -2-13-/19
Commissioner Date
Note: All volumes must be correcte,
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
J
AOGCC Excess Flare Report
March-2018
NORTHSTAR — NSU GATHERING
Ending
M=ipNo
FacilityNo Date Flared Start Time
Time
End Date
Planned
MCF -1 Description of Flaring Event
Action Taken to Minimize Volume
EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL HP-A
3/1/2018 124250
0290000025 3/1/2018 721:00
10:16.00
3/1/2018
U
3,215 START UP HP-A COMPRESSOR.
COMPRESSOR IS SUCCESSFULLY STARTED
UP.
EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL HP-A
3/1/2018 124250
0290000025 3/1/2018 1401:00
15:44:00
3/1/2018
U
612 START UP HP-A COMPRESSOR.
COMPRESSOR IS SUCCESSFULLY STARTED
UP. I
EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL HP-A
3/1/2018 124250
0290000025 3/1/2018 18:04:00
21:15:00
3/1/2018
U
1,270 STARTUP HP-A COMPRESSOR.
COMPRESSOR IS SUCCESSFULLY STARTED
UP.
EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
3/1/2018 124250
0290000025 3/2/2018 6:13:00
7:31:00
3/2/2018
U
595 STARTUP HP-A COMPRESSOR.
COMPRESSOR IS SUCCESSFULLY STARTED.
EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
3/1/2018 124250
0290000025 3/2/2018 731:00
8:40:00
3/2/2018
U
599 STARTUP HP-A COMPRESSOR.
COMPRESSOR IS SUCCESSFULLY STARTED.
EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
3/1/2018 124250
0290000025 3/2/2018 11:22:00
12:44:00
3/2/2018
U
43:STARTUP HP-A COMPRESSOR.
COMPRESSOR IS SUCCESSFULLY STARTED.
EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL '..
3/1/2018 124250
0290000025 3/2/2018 16:46:00
19:53:00
3/2/2018
U
2,225 STARTUP HP-A COMPRESSOR.
COMPRESSOR IS SUCCESSFULLY STARTED.
3/1/2018 124250
0290000025 3/3/2018 8:48:00
10:21:00
3/3/2018
U
512 EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
START UP HP-A COMPRESSOR.
COMPRESSOR IS STARTED.
3/1/2018 124250
0290000025 3/3/2018 10:21:00
12:26:00
3/3/2018
U
1,996 EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
START UP HP-A COMPRESSOR.
COMPRESSOR IS STARTED.
3/1/2018 124250
0290000025 3/3/2018 12:51:00
14:35:00
3/3/2018
U
1,777 EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL;
START UP HP-A COMPRESSOR.
COMPRESSOR IS STARTED,
3/1/2018 124250
0290000025 3/3/2018 15:33:00
17:06.00
3/3/2018
U
1,116 EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
START UP HP-A COMPRESSOR.
COMPRESSOR IS STARTED,
3/1/2018 124250
0290000025 3/3/2018 17:10:00
19:56:00
3/3/2018
U
1,587 EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
START UP HP-A COMPRESSOR.
COMPRESSOR IS STARTED.
3/1/2018 124250
0290000025 '.. 3/3/2018 17:12:00
18:39:00
3/3/2018
U
147 EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
START UP HP-A COMPRESSOR.
COMPRESSOR IS STARTED.
3/1/2018 124250
0290000025 3/3/2018 19:41:00
21:54:00
3/3/2018
U
200 EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
START UP HP-A COMPRESSOR.
COMPRESSOR IS STARTED.
3/1/2018 124250
0290000025 3/32018 220700
23:16:00
3/32018
U
85 EXCESS FLARING DUE TO ATTEMPTS TO
EXCESS FLARING NECESSARY UNTIL
START UP HP-A COMPRESSOR.
COMPRESSOR IS STARTED.
3/1/2018 124250
0290000025 3/4/2018 0:00:00
72500
3/4/2018
U
544 EXCESS FLARING DUE TO ATTEMPTED START
EXCESS FLARING NECESSARY UNTIL LP
UP OF LP COMPRESSOR.
COMPRESSOR IS STARTED.
3/1/2018 124250
0290000025 31212018 12:57:00
16:27:00
3212018
U
3,793 EXCESS FLARING DUE TO SHUTDOWN OF
EXCESS FLARING NECESSARY UNTIL PLANT'
FIRE EYE CAUSING SAFETY PLC TO SHUT
CAN BE RESTARTED.
3112018 124250
0290000025 3/21/2018 16:31:00
18:15:00
3/21/2018
U
147 EXCESS FLARING DUE TO SHUTDOWN OF
EXCESS FLARING NECESSARY UNTIL PLANT
FIRE EYE CAUSING SAFETY PLC TO SHUT
CAN BE RESTARTED.
EXCESS FLARING DUE TO SHUTDOWN OF HP- EXCESS FLARING NECESSARY UNTIL
3/1/2018 124250
0290000025 3/29/2018 5:17:00
7:29:00
3/29/2018
P
343 B TURBINE FOR SCHEDULED REPAIR.
EQUIPMENT IS REPAIRED AND BROUGHT
_..
:BACK ONLINE.
20,809
__
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 13. Field 4. Operator 5. Month/Year of Disposition
0290000025 Northstar Northstar HILCORP ALASKA LLC dl 2018
Dis ositionVolume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold
0
7. Reinjected
16,682,894
8. Flared or vented 1 hour or less
1,170
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
5,309
11. Assist Gas
0
12. Fuel gas used in lease operations
530,320
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
17,219,693
15. NGL Gas Equivalent
0
16. Purchased gas:
1,104
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,104
Use
Use
MCF
:ertity that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Production Analyst pressure of 14.65 Pala and to a
temperature of 60o F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6. Sold
0
7. Reinjected
16,243,574
8. Flared or vented 1 hour or less
127
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
527,437
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
16,776,624
15. NGL Gas Equivalent
0
16. Purchased gas:
1,141
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,141
7eltny trial me tt000rreeg�oing Is true
and correct t0 me best of my Knowledge.
Signature `�►'��`�y'"" WywA Title
20. For production from multiple pools, list contribution of each pool as a percent of
INORTHSTAR. NORTHSTAR-KUPARUK OIL POOL] 590150 1 28.36% 1
Use
Date 6/13/2018
Date
As: All volumes must be corrected
pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
1. Facility Number
Facility Name
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6. Sold
0
7. Reinjected
15,337,590
8. Flared or vented 1 hour or less
3,061
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
500,668
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
15,846,805
15. NGL Gas Equivalent
0
16. Purchased gas:
1,141
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing
1,141
Authorization >1 hr:
Use
as a
canny that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Production Analyst pressure of 14.65 pals and to a
temperature of 60o F. Authority 20