Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutNorthstar - Hilcorp Alaska, LLCSTATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Facility Name 6. Sold 0 7. Reinjected 17,730,369 8. Flared or vented 1 hour or less 14 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 5,486 11. Assist Gas 0 12. Fuel gas used in lease operations 560,286 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 18,296,155 15. NGL Gas Equivalent 0 16. Purchased gas: 0 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing :envy that the foregoing is true and correct to the best of my knowledge. e"`""' Signature 3& yt& 0 71 20. For >1 hr: Name Total Use iry 2018 as a percent lots: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 1. Facility Number 0290000025 2. Facility Name 1 Northslar 3. Field Northstar 4. Operator I HILCORP ALASKA LLC 5. Month/Year of Disposition I February 2018 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. S. Sold 0 Pool Name Pool Code Percent 7. Reinjected 13,458,283 NORTHSTAR, NORTHSTAR OIL 590100 70.54 NORTHSTAR, NORTHSTAR-KUPARUK OIL POOL 590150 29.46% 8. Flared or vented 1 hour or less 5,093 9. Flared or vented more than 1 hour (see instr.) 537 10. Pilot and Purge 4,955 11. Assist Gas 0 12. Fuel gas used in lease operations 441,435 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: > x %'j5h Safely ✓ MCF 14. TOTAL VOLUME (ITEMS 6-13) 13,910,303 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas: 0 Waste: MCF 17. Transferred from: (Off -lease Gas) 0 n P / 3-2-2-18 / Commissioner Date 18. Transferred to: 0 Note: All volumes must be corrected to Analyst pressure of 14.65 psia and to a temperature of 60o F. Authority 20 19. Remarks: Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. /� J_ f7L� /L Signature a l',�/' CLG .7C(.[.l� & Title Production AOGCC Excess Flare Report February -2018 NORTHSTAR — NSU GATHERING Ending RptDate OpNo FacilityNo Date Flared StartTime Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume J EXCESS FLARING DUE TO THE LP SCRUBBER EXCESS FLARING NECESSARY UNTIL PLANT GOING DOWN DURING STATE VALVE TESTING IS STABILIZED AND LP IS RESTARTED. 2/1/2018 124250 0290000025 2/17/2018 14:51:00 17:00:00 2/17/2018 U 312 DUE TO PROCESS PRESSURE UPSET IN PLANT. EXCESS FLARING DUE TO A CRACK IN THE EXCESS FLARING NECESSARY UNTIL PLANT ENGINE CASE OF HP -B RESULTING IN THE CAN BE RESTARTED. 2/1/2018 124250 0290000025 2/27/2018 205200 22:05:00 2/27/2018 U 224 SHUTDOWN OF THE UNIT AND THE ENTIRE PLANT. 537 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Facility Number 0290000025 2. Facility Name 1 Northstar 3. Field N( Disposition Volume MCF Sold 0 Reinjected 13,970,511 Flared or vented 1 hour or less 9,632 Flared or vented more than 1 hour (see instr.) 20,809 Pilot and Purge 5,486 Assist Gas 0 Fuel gas used in lease operations 442,883 Other (see instructions) 0 TOTAL VOLUME (ITEMS 6-13) 14,449,321 NGL Gas Equivalent 0 Purchased gas: 1,141 Transferred from: (Off -lease Gas) 0 Transferred to: 0 Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,141 Signature " Title 20. For production from multiple pools, list contribution of each pool as a percent of Oficial Use Only Authorization >1 hr: Safety /- MC r Lease Use MCF Conservation MCF Waste: MCF E�yc .�1---� -2-13-/19 Commissioner Date Note: All volumes must be correcte, to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 J AOGCC Excess Flare Report March-2018 NORTHSTAR — NSU GATHERING Ending M=ipNo FacilityNo Date Flared Start Time Time End Date Planned MCF -1 Description of Flaring Event Action Taken to Minimize Volume EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL HP-A 3/1/2018 124250 0290000025 3/1/2018 721:00 10:16.00 3/1/2018 U 3,215 START UP HP-A COMPRESSOR. COMPRESSOR IS SUCCESSFULLY STARTED UP. EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL HP-A 3/1/2018 124250 0290000025 3/1/2018 1401:00 15:44:00 3/1/2018 U 612 START UP HP-A COMPRESSOR. COMPRESSOR IS SUCCESSFULLY STARTED UP. I EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL HP-A 3/1/2018 124250 0290000025 3/1/2018 18:04:00 21:15:00 3/1/2018 U 1,270 STARTUP HP-A COMPRESSOR. COMPRESSOR IS SUCCESSFULLY STARTED UP. EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL 3/1/2018 124250 0290000025 3/2/2018 6:13:00 7:31:00 3/2/2018 U 595 STARTUP HP-A COMPRESSOR. COMPRESSOR IS SUCCESSFULLY STARTED. EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL 3/1/2018 124250 0290000025 3/2/2018 731:00 8:40:00 3/2/2018 U 599 STARTUP HP-A COMPRESSOR. COMPRESSOR IS SUCCESSFULLY STARTED. EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL 3/1/2018 124250 0290000025 3/2/2018 11:22:00 12:44:00 3/2/2018 U 43:STARTUP HP-A COMPRESSOR. COMPRESSOR IS SUCCESSFULLY STARTED. EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL '.. 3/1/2018 124250 0290000025 3/2/2018 16:46:00 19:53:00 3/2/2018 U 2,225 STARTUP HP-A COMPRESSOR. COMPRESSOR IS SUCCESSFULLY STARTED. 3/1/2018 124250 0290000025 3/3/2018 8:48:00 10:21:00 3/3/2018 U 512 EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL START UP HP-A COMPRESSOR. COMPRESSOR IS STARTED. 3/1/2018 124250 0290000025 3/3/2018 10:21:00 12:26:00 3/3/2018 U 1,996 EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL START UP HP-A COMPRESSOR. COMPRESSOR IS STARTED. 3/1/2018 124250 0290000025 3/3/2018 12:51:00 14:35:00 3/3/2018 U 1,777 EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL; START UP HP-A COMPRESSOR. COMPRESSOR IS STARTED, 3/1/2018 124250 0290000025 3/3/2018 15:33:00 17:06.00 3/3/2018 U 1,116 EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL START UP HP-A COMPRESSOR. COMPRESSOR IS STARTED, 3/1/2018 124250 0290000025 3/3/2018 17:10:00 19:56:00 3/3/2018 U 1,587 EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL START UP HP-A COMPRESSOR. COMPRESSOR IS STARTED. 3/1/2018 124250 0290000025 '.. 3/3/2018 17:12:00 18:39:00 3/3/2018 U 147 EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL START UP HP-A COMPRESSOR. COMPRESSOR IS STARTED. 3/1/2018 124250 0290000025 3/3/2018 19:41:00 21:54:00 3/3/2018 U 200 EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL START UP HP-A COMPRESSOR. COMPRESSOR IS STARTED. 3/1/2018 124250 0290000025 3/32018 220700 23:16:00 3/32018 U 85 EXCESS FLARING DUE TO ATTEMPTS TO EXCESS FLARING NECESSARY UNTIL START UP HP-A COMPRESSOR. COMPRESSOR IS STARTED. 3/1/2018 124250 0290000025 3/4/2018 0:00:00 72500 3/4/2018 U 544 EXCESS FLARING DUE TO ATTEMPTED START EXCESS FLARING NECESSARY UNTIL LP UP OF LP COMPRESSOR. COMPRESSOR IS STARTED. 3/1/2018 124250 0290000025 31212018 12:57:00 16:27:00 3212018 U 3,793 EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL PLANT' FIRE EYE CAUSING SAFETY PLC TO SHUT CAN BE RESTARTED. 3112018 124250 0290000025 3/21/2018 16:31:00 18:15:00 3/21/2018 U 147 EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL PLANT FIRE EYE CAUSING SAFETY PLC TO SHUT CAN BE RESTARTED. EXCESS FLARING DUE TO SHUTDOWN OF HP- EXCESS FLARING NECESSARY UNTIL 3/1/2018 124250 0290000025 3/29/2018 5:17:00 7:29:00 3/29/2018 P 343 B TURBINE FOR SCHEDULED REPAIR. EQUIPMENT IS REPAIRED AND BROUGHT _.. :BACK ONLINE. 20,809 __ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 13. Field 4. Operator 5. Month/Year of Disposition 0290000025 Northstar Northstar HILCORP ALASKA LLC dl 2018 Dis ositionVolume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 6. Sold 0 7. Reinjected 16,682,894 8. Flared or vented 1 hour or less 1,170 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 5,309 11. Assist Gas 0 12. Fuel gas used in lease operations 530,320 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 17,219,693 15. NGL Gas Equivalent 0 16. Purchased gas: 1,104 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,104 Use Use MCF :ertity that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Production Analyst pressure of 14.65 Pala and to a temperature of 60o F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 0 7. Reinjected 16,243,574 8. Flared or vented 1 hour or less 127 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 5,486 11. Assist Gas 0 12. Fuel gas used in lease operations 527,437 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 16,776,624 15. NGL Gas Equivalent 0 16. Purchased gas: 1,141 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,141 7eltny trial me tt000rreeg�oing Is true and correct t0 me best of my Knowledge. Signature `�►'��`�y'"" WywA Title 20. For production from multiple pools, list contribution of each pool as a percent of INORTHSTAR. NORTHSTAR-KUPARUK OIL POOL] 590150 1 28.36% 1 Use Date 6/13/2018 Date As: All volumes must be corrected pressure of 14.65 psis and to a temperature of 60o F. Authority 20 1. Facility Number Facility Name STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 0 7. Reinjected 15,337,590 8. Flared or vented 1 hour or less 3,061 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 5,486 11. Assist Gas 0 12. Fuel gas used in lease operations 500,668 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 15,846,805 15. NGL Gas Equivalent 0 16. Purchased gas: 1,141 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 Line 16 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,141 Authorization >1 hr: Use as a canny that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Production Analyst pressure of 14.65 pals and to a temperature of 60o F. Authority 20