Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CGF B - BP Exploration (Alaska), Inc.STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY RFPORT rlr Y_` A 0 nIc%Mr%r%ii Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING AND VENTING INCIDENT REPORT January 2018 1/8/2018 1837-1840 387 Not required for events <= 1 hr 1/8/2018 2314-2320 328 1/22/2018 0009-0034 387 1/22/2018 0141-0153 387 exceeding 5,000 MCF TOTAL 1,489 planned events greater than 1 hour exceeding 5,000 MCF DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1/8-9/2018 1837-0112 52,960 See attachments 1/22/2018 0009-0153 626 TOTAL 53,586 fined events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1/5/2018 0610-0615 400 Not required for events <= 1 hr 1/13/2018 1710-1747 400 1/14/2018 0203-0238 430 TOTAL 1,230 1/30/2018 2217-2347 387 See attachments TOTAL 387 TOTAL Unplanned Events < 1 Hour 1,489 Unplanned Events> 1 Hour 53,586 Planned Events < 1 hour and not 1,230 exceeding 5,000 MCF Planned Events > 1 hour or 387 exceeding 5,000 MCF Pilot Purge 24,455 Assist 54,411 TOTAL FLARED VOLUME 135,558 Not required for events <= 1 hr See attachments ALTION TAKEN TO ELIMINATE CAUSI Not required for events <= 1 hr See attachments Page 3 2/13/2018 10:42 AM Flare Start Date 01/01/2018 Flare End Date 01/31/2018 CGF Flare Report Total Volume (MSCF) 56692 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume Action Taken 18-7 Controlled Blowdown 01/08/2018 6:37:00 pm 12:00:00 am 323 min Yes No No BPI\GONDEO 47323 Determination Cause Stabilizer overhead pressure relief as a result of nC 1805 shutdown due to controNnstrumentation failure associated with 86SESD and TIC 1855 later S/D due to control/instrumentation issue associated with P49S Action Taken MI production was cut to lower gas production until 1855 TIC restarted. 18-26 Controlled Blowdown 01/09/2018 12:00:00 am 1:12:00 am 72 min Yes No No BP1\GONDEO 5637 Determination Cause Stabilizer overhead pressure relief as a result of T\C 1805 shutdown due to controNnstrumentation failure associated with 86SESD and T/C 1855 later S/D due to control/instrumentation issue associated with P49S Action Taken MI production was cut to lower gas production until 1855 T/C restarted. 18-17 Controlled Blowdown 01/22/2018 12:09:00 am 15300 am 104 min Yes No No BPI GONDEO 626 Determination Cause Stabilizer overhead pressure relief resulting from T\C 1805 shutdown due to control\instrumentation failure associated with backup PLC Action Taken T/C 1855 was running in parallel to 1805 so the load was transferred fully to 1855 and Flaring ceased. 18-23 Controlled Blowdown 01/30/2018 10:17:00 pm 11:47:00 pm 90 min No No Yes BP7\CONNK7 387 Determination Cause 1855 shut down for planned maintenance Action Taken flaring complete Generated 02/02/2018 9:52:54AM Page 3 of 8 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000008 Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I February -2018 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,509,154 Pool Name Pool Code Percent 7. Reinjected 6,313,873 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 525 9. Flared or vented more than 1 hour (see inslr.) 0 10. Pilot and Purge 22,026 11. Assist Gas 46,869 12. Fuel gas used in lease operations. 2,887 713 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 10,780,160 Lease Use MCF 15. NGL Gas Equivalent 1,509,154 Conservation MCF 16. Purchased gas 0MCF Waste: 17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3 213,627,275 18. Transferred to: (Express as a negative # FSI, FS2, FS3, CCP & GPMA ( p 9 ) -202,847,114 Commissioner Date 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,826,466 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a Printed Name Diane Colley Phone (907) 564-5775 Date temperature of 60o F. Authority 20 AAC25 235, Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING AND VENTING INCIDENT REPORT February 2018 - - --- ---- ALI 1UN IAKIN TO ELIMINATE CAUSE 2/25/2018 0606-0650 525 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 525 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned events less than or equal to 1 hour Not required for events <=1 hr TOTAL 0 UtSCRIPTION OF IN See attachments TOTAL 0 Not required for events <= 1 hr See attachments Page 2 3/12/2018 10:49 AM TOTAL Unplanned Events < 1 Hour 525 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 22,026 Assist 46,869 TOTAL FLARED VOLUME 69,420 Not required for events <= 1 hr See attachments Page 2 3/12/2018 10:49 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DIRPOSiTIMI 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator • BP 5. Monthlyear of Disposition I March -2018 Disposition Volume MCF 20. FOrproduchon from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,707,963 Pool Name Pool Code Percent 7. Reinjected 7,365,675 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 787 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 24,544 11. Assist Gas 51,092 12. Fuel gas used in lease operations. 3,291,269 13. Other (see instructions) p Official Use OnlyAuthorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 12,441,330 Lease Use MCF 15. NGL Gas Equivalent 1,707,963 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GCT, GC2 & GC3 237,317,654 Commissioner Date 18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA -224,876,323 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 2,340,602 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. //�g/�[/�p Note: All volumes must be corrected Signature S/lt,V! tXC(!.t,� TiOe Manacer Production Taxes and Royalties Alaska to pressure Of 14.65 psis and to a / �j temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Dale b Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL GAS FACILITY GAS FLARING AND VENTING INCIDENT REPORT March 2018 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/17/2018 0622-0642 400 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 400 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/14/2018 1223-1300 387 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 387 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VOLUME DESCRIPTION OF INCIDENT & See attachments 0 TOTAL 400 0 387 0 24,544 51,092 76,423 ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 3 4/10/2018 3:25 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition Aril -2018 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. s. sold 1,595,166 Pool Name Pool Code Percent 7. Reinjected 7,509,309 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,758 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 23,564 11. Assist Gas 54,170 12. Fuel gas used in lease operations. 3,151,895 13. Other (see instructions) U Official Use Only Authorization >t hr Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 12,335,862 Lease Use MCF 15. NGL Gas Equivalent 1,595,166 Conservation MCF 16. Purchased gas UMCF Waste: 17. Transferred from: FS1, FS2, FS3, GCI, GC2 8 GC3 225,327,238 Commissioner Date 18. Transferred to: (Express as a negative #) FSI, FS2, FS3, CCP 8 GPMA -212,991,377 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,716,252 mscf I hereby certify that the the f�g is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska t0 pressure of 14.65 psis and to a / temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date o Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING AND VENTING INCIDENT REPORT April 2018 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/9/2018 2214-2234 387 Not required for events <= 1 hr Not required for events <= 1 hr 4/9/2018 2215-2228 594 4/10/2018 0038-0058 387 TOTAL 1,368 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/11/2018 0112-0132 19S Not required for events <= 1 hr Not required for events <= 1 hr 4/11/2018 0112-0132 195 TOTAL 390 I Imt VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO I See attachments See attachments TOTAL 0 Page 4 5/9/2018 4:35 PM TOTAL Unplanned Events < 1 Hour 1,368 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 390 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 23,564 Assist 54,170 TOTAL FLARED VOLUME 79,492 Page 4 5/9/2018 4:35 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I May -2018 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,568,180 Pool Name Pool Code Percent 7. Reinjected 5,677,667 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,170 9. Flared or vented more than 1 hour (see instr.) 78,258 10. Pilot and Purge 24,072 11. Assist Gas 67,127 12. Fuel gas used in lease operations. 2,968,427 13. Other (see instructions) 0 Official Use Onty Authorization >7 hr. S 7 (i /y 7 4 MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,385,901 Lease Use MCF 15. NGL Gas Equivalent 1,568,180 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3 224,147,664 P z / 18. Transferred to: (Express as a negative #) FSI, FS2, FS3, CCP & GPMA -213,761,763 Commissioner Date 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,996,784 mscf the I hereby certify that foregoing oregoing is true=>rrect of my k owledge. Note: All volumes must be corrected SignatuIQ Title Mana er Production Taxes an Ro allies Alaska to pressure Of 14.65 psia and t0 a J I C temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date ' 7 % g Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING AND VENTING INCIDENT REPORT Page 2 May 2018 RAIL TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSI 5/17/2018 0218-0233 328 Not required for events <= 1 hr Not required for events <= 1 hr 5/31/2018 2120-2215 22 TOTAL 350 unplanned events greater than 1 hour TOTAL Unplanned Events < 1 Hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/12/2018 2042-2400 1,318 See attachments See attachments 5/13/2018 0835-1723 61,975 Pilot Purge 5/17/2018 0219-0403 14,965 TOTAL FLARED VOLUME 171,627 TOTAL 78,258 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/4/2018 0250-0330 400 Not required for events <= 1 hr Not required for events <= 1 hr 5/5/2018 0014-0054 400 5/6/2018 0829-0839 190 5/6/2018 1241-1255 430 5/11/2018 0213-0223 400 TOTAL 1,820 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO 1 See attachments See attachments TOTAL 0 6/11/2018 3:16 PM TOTAL Unplanned Events < 1 Hour 350 Unplanned Events> 1 Hour 78,258 Planned Events < 1 hour and not 1,820 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 24,072 Assist 67,127 TOTAL FLARED VOLUME 171,627 6/11/2018 3:16 PM FlareStartDate 05/01/2018 Flare End Date 05/31/2018 CGF Flare Report Total Volume (MSCF) 80428 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 18-153 Flare Relief 05/12/2018 8:42:00 pm 12:00:00 am 198 min Yes No No BPI\VINZANRA 1318 Determination Cause An external leak of F20AV, MI line to WOA, forced us to Bare while we isolate the leak. Action Taken Reduced MI make 18-152 Flare Relief 05/13/2018 8:35:00 am 5:23:00 pm 528 min Yes No No BP11VTNZANRA 61975 Determination Cause TIC 1805 shutdown due to controNnstrumentation failureassociated with blow case level control problems. Action Taken Bypassed the plant, reduced MI make and Baring was permitted to continue while operations personnel attempted to restart the 18-130 Flare Relief 05/17/2018 2:19:00 am 4:03:00 am 104 min No No No BPI\BOLDJT 14965 Determination Cause Stabilizer overhead flaring in response to unintended SID of T/C 1805 Action Taken Flare valve closed Generated 06/06/2018 3:01:31 PM Page 2 of 7 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECLNE NOV 14 2018 AOGCC 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. i of t /Year of Disposition October -2018 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,585,621 Pool Name Pool Code Percent 7. Reinjected 6,571,314 PRUDHOE 640150 100.003/.-- 00.00%8. 8.Flared or vented 1 hour or less 3,876 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 15,810 11. Assist Gas 3,889 12. Fuel gas used in lease operations. 2,933,638 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 11,114,148 Lease Use MCF 15. NGL Gas Equivalent 1,585,621 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3 212,560,956 Commissioner Date 18. Transferred to: (Express as a negative # FS1, FS2, FS3, CCP & GPMA ( p 9 ) -201,446,809 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,895,589 mscf I hereby certify thaAa foregoing is true and correct to the best of my knowledge. d1�a Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure Of 14.65 psia and to a J di ry temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date d Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING AND VENTING INCIDENT REPORT October 2018 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/6/2018 1322-1337 190 Not required for events <= 1 hr Not required for events <= 1 hr 10/9/2018 1102-1117 387 10/16/2018 0248-0253 10/21/2018 1246-1248 27 712 23,575 10/26/2018 0550-0615 TOTAL 604 TOTAL 3,272 Planned events greater than 1 hour Unplanned events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 planned events less than or equal to 1 hour -- DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/2/2018 0148-0153 400 Not required for events <= 1 hr Not required for events <= 1 hr 10/3/2018 1515-1520 400 Planned Events> 1 hour or 10/5/2018 0359-0405 400 10/16/2018 0248-0253 850 Assist 10/16/2018 1457-1503 712 23,575 10/26/2018 0550-0615 510 TOTAL 3,272 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Page 3 11/13/2018 1121 AM TOTAL Unplanned Events < 1 Hour 604 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 3,272 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 15,810 Assist 3,889 TOTAL FLARED VOLUME 23,575 Page 3 11/13/2018 1121 AM