Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout212-126 • • ' SOFT� Alaska Oil and Gaswe � � y�� THE STATE� y, �\ti OfAL /` SKA Conservation Commission 5} 2 h !� 333 West Seventh Avenue C GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 w `' Main: 907.279.1433 OFALAS Fax: 907.276.7542 www.aogcc.alaska.gov Matthew Ganley Unaatuq, LLC. 4600 Debarr Road, Suite 200 Anchorage, AK 99508 scANNED AUG 1 8 2012 Re: Pilgrim Hot Springs Field, PS 12-3 Permit to Drill Number: 212-126 Sundry Number: 317-341 Dear Mr. Ganley: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Suspension is valid until August 11, 2022. Thirty days prior to that date, operator must submit a new Sundry Application for continued suspension. The application must contain sufficient information to determine that continued suspension of the PS 12-1, PS 12-2 and PS 12-3 wells are appropriate under 20 AAC 25.110. As provided in AS 31.05.080, within 20 days after written notice of this decision,or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. • Sincerely, C2CS-1 - Hollis S. French 4S Chair, Commissioner DATED this < < day of August, 2017. RBDMS 17' AUG 1 4 2017 • • • RECEIVED STATE OF ALASKA ,JUL 2 4 2017 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC 20 PAC 25.280 1.Type of Request: Abandon 0 Plug Perforations❑ Fracture Stimulate ❑ Repair Well❑ Operations shutdown 0 Suspend ® Perforate 0 Other Stimulate 0 Pull Tubing 0 Change Approved Program❑ Plug for Redd' 0 Perforate New Pool ❑ Re-enter Susp Well 0 Alter Casing ❑ Other: 0 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. UNAATUQ,LLC EKY' rzr Development 0 212-126 3.Address: 4600 Debarr Road Stratigraphic ❑ Service ❑ 6.API Number: Suite 200 50-031-20010-00-00 Anchorage,AK 7.If perforating: 99508 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A PS-123 (Formerly PS-12-9) Will planned perforations require a spacing exception? Yes 0 No al 9.Property Designation(Lease Number): 10.Field/Pool(s): Private/Unaatuq,LLC(U.S.S.565) Pilgrim Hot Springs 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): Junk(MD): 1183ft 1183ft 1183ft 1183ft 993ft 1065ft Casing Length Size MD TVD Burst Collapse Structural Conductor 5 ft 10 3/4" 5 ft 5 ft Surface 144 ft 6 5/8" 144 ft 144 ft Intermediate Production 993 ft 2.19" 993 ft 993 ft Liner Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): N/A NP0(21. wA N/A N/A N/A Packers and SSSV Type: Packers and SSSV MD(ft)and ND(ft): 12.Attachments: Proposal Summary 0 Wellbore schematic ® 13.Well Class after proposed work Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ® Stratigraphic❑ Development❑ Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: OIL ❑ WINJ ❑ WDSPL 0 Suspended al 16.Verbal Approval: Date: GAS 0 WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Matthew Ganley Contact Name: Matthew Ganley Authorized Title: Contact Email: mganley@beringstraits.com Contact Phone: (907)344-7212 Authorized Signature: �� Date: 0719/2017 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ' r \ Plug Integrity ❑ BOP Test ID Mechanical Integrity Test ID Location Clearance 0 " other: lt-x•41e,t�S f;`'N ieerc�...0u tt.ii c( r,, /r r�' c'- .. j. (SC3 j� Ty'-`"``s 15.__ GcFFP-`j Post Initial Injection MIT Req'd? Yes 0 No 0 �t ) Spacing Exception Required? Yes ❑ No 16J Subsequent Form Required: /lJc r—Ci–^'` s'eb•'•�--.'(J� APPROVED BY / Approved by: MMISSIONER THE COMMISSION Date: f " r 4/E11'7- ,0'�l°(17 Yli/7 Submit Form and i orm 10-403 Re 5 d 20 Approved application is valid for 12 months rom the date of approval. Attachments in Duplicate RIGINAL ,. RBDMS t� AT,3 1 4 2017 • • BERING RECEIVED ft A !! jrIS JUL 2 4 2017 AOGCC July 19t'', 2017 Hollis S. French, Commissioner Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501 RE: Request for Suspended status for wells PS-12-1 (212-077), PS-12-2 (212-109), and PS-12-3 212-126). Ms. Bettis: This letter is in response to your email of June 13, 2017, which requested submission of Application for Sundry Approval for three temperature gradient wells at Pilgrim Hot Springs. In response, I am forwarding two copies of the required information: 1) An Application for Sundry Approvals (Form 10-403)for each well (PS12-1, PS12-2, PS12-3, PS13-1); 2) A well schematic diagram for each well; 3) A letter from Graphite One, regarding potential power development at Pilgrim Hot Springs. 4) A summary sheet noting the justification for maintaining the current status of each well. 5) Report dated October 16, 2014, submitted by the Alaska Center for Energy and Power and titled, Utility of Maintaining Recent Wells at Pilgrim Hot Springs for Monitoring and On-Site Utilization. The PS-12 wells represent a significant investment and the plugging and abandoning of these assets would set back any future program that might use the resource for electrical generation or on-site power and heat. As an example of the need for maintaining the wells, Unaatuq, LLC received a grant from USDA/NRCS in 2016 for an agricultural pilot program that is expected to utilize on-site electrical power and heat for the region's food security. In addition to the agricultural project,a mining interest is considering working with Unaatuq to establish a geothermal plant that could produce power for their graphite project some 20 miles from the Hot Springs. I have attached a letter from Graphite One expressing their interest in working on such a program. To summarize,we are requesting that the wells PS-12-1(212-077), PS-12-2 (212-109), and PS-12-3 212- 126), remain in Suspended Status due to the ongoing agricultural program there (and the future need for on-site power and heat),the potential for powering the Graphite One mining program, and the need to 4600 DeBarr Road,Suite 200 • Anchorage. Alaska 99508-3126 • 907.563.3788 • Fax 907.563.2742 • www.beringstraits.com • • . sof BERING STRoAIT,S keep these wells suspended for monitoring the reservoir when PS-13-1 (213-102) is brought into production. I appreciate the work of the Commission and will submit additional materials to support our request if needed. Regards, 1/1114 Matt Ganlgi VP Media and External Affairs Bering Straits Native Corporation (Managing Partner for Unaatuq, LLC) 4600 DeBarr Road,Suite 200 • Anchorage.Alaska 99508-3126 • 907.563.3788 • Fax 907.563.2742 • www.beringstraits.com • • High-pressure ball valve ----Ow { 6 5/114n 00 conductor casing cemented to 144 ft below land surface 1 219-in OD casing cemented from land surface to 993 ft. Lr `` Rubber cement plug in bottom of casing 5 5/8-in hole drilled to 1183 ft. Grout filled from 993 to 1183 ft. Schematic:PS 12-3: (Please refer to"Application for Application for Sundry Approvals,"Section 11 for Well Condition Summary). • • 9— L 0 N Q C N a) N a) o IV0 a) L C N C �.,, - O O . 0 .0 O 0 • C _ C — C N a a) (o Cl.) (a a ca •c o C b f6 CO a) Cs '� 3 '� 3 '� o 3 z c o � (U ( c t c t t t E otY ras Mcv a) (a a) (a a) (o 0 v, 11O 0 N +-. v in i3.- 3 1 3 =a 3 v :. 3 ' _c 0 ., L 0 R 0 E O a 0O a) N O m b 4- qA 4- OD `►_ • v, � S U a) C a) a—D.. y,, O +� a) ++ ++ • = +' 0 3 13 0 C 0 C 0 C .>� 0 J . v .0 a) 7 U d N 4-+ N 4-. N — J 0 = C +- M N • o o a a) 3 = _}c-, v o o c `° O 0 - 0 - 0 - -o c `° o 'o a— 0 ° aa) cu c aai c aa) c ra c M a cu 3 0.., v cc i.+ co 4-. CO ++ (O D a) �-- N 3 U L N c s ' 0 - O vii vii vii13 •N m 73 n, , a. J ON C ra 4.4 N (a (E RS (a }) L c u0 C to () to L L L L O ( O C C O D 0 v 0 D 0 (a Z c L +3 cU as is ._ v = a) a) a) C a) O a cc = co c E a) a a) a a) a 0 a) to z a) v) : 0 7 0 = 0 a=., N0 j a) -0 +S-' 4-, 3 c 3 c 3 C —co ° z o o a°, 3 .� N .' m .- N L a .V � ++ }., OD C tJ , c , CO , to — L h0 7 N QS U a) as c c c 3 a) (a u a) 0a) 'L +; .0 L a' N (0 V7 (6 V7 .(6 a) 0 t UO L u • ° a. U d U a. U < to o, < .g. a 4,as 03 o Vf C a) .a L a) N_ (o N d0 r. a+ _• -c 0 N s L GAS N *' i O N a - 'a -0 Cs bO ,0 S y as = a) a) a) t y W a a a N N N 0 CC (C ✓ 'a inN a N 3 _ oc▪o -0 LL V1 a) 03 a) to 4.., -O -0 -0 c C C C C 'C i a) a a a N N N .C- 0 U p N V) vii N E N O c co m a.' O U .,_- <-1th <-1 ri 0 Y U H a a Q o >- a a L a L L L co a) _ bo n) v a) = a, E E E 3 16 rop 4O' O 4-- C C V N O ri N p (C ri Z N N N m Tr Q a. c-1 c-I <--I .0 -O J.) Q. 0_ N 4-) N E N O = a. c- Z N 0c l0 ri O , a. �Ni N (O i N N N C C a N N N d 00 • Utility of Maintaining Recent Wells at Pilgrim Hot Springs for Monitoring and On-Site Utilization October 17,2014 By the Alaska Center for Energy and Power Since 2010,the Alaska Center for Energy and Power has been leading geothermal exploration efforts at Pilgrim Hot Springs. The property is owned by Unaatuq LLC.,a partnership of seven organizations based on the Seward Peninsula. In 2012 and 2013 four wells were drilled on the property which fall under the jurisdiction of the Alaska Oil and Gas Conservation Commission. The wells drilled during this period are best left open and operational as a means to monitor the geothermal aquifer,and in the case of PS13-1 provide geothermal fluid for onsite use. Three of these wells, called P512-1, PS12-2, and PS 12-3 were drilled as temperature gradient holes to tegh•pnessure bail valve —--+ HIgtnpnasure ball valve n 6 519 in 00 conductor casing 6 Vain OD conductor casing cemented to 10011 Dhow cemented to 200 ft below land surface lend surface 4.5-br OD casing cemented to 100011 below land surface 4.54n 00 casing cemented to 9000 ft below land surface 2.194n 00 casing cemented from land surface to 160 ft below land surface.Grouted kern 4e8 b*294 R below lend surface. Bottom cap wel Figure 1.PS 12-1(left)and PS 12-2(right) depths ranging from 1000 feet to 1294 feet. Diagrams of these wells are shown in figures 1-2. These wells are constructed with sealed casing which is plugged at the bottom. The casing is not perforated and the wells are not open to the formation. They do not have ability to flow artesian as other perforated wells at the site do. Once the wells were completed,the casing was filled with water and they serve as temperature gradient monitoring wells. Temperature logs, like the one shown in figure 3 are created using the temperature profiles measured in the wells. These wells are very useful for monitoring subtle long term changes in the geothermal field. • i Currently,there are plans to develop Pilgrim Hot Springs to generate electricity and export this power to Nome. A private developer, under the name Pilgrim Nigh-pressure ballValve _____ Geothermal LLC., has signed a power purchase agreement with Nome Joint Utility Systems to supply up — to two MW of electrical power to the utility. This would 6 518-.n UD conductor casing cemented to 144 ft below require the extraction and reinjection of large amounts of land surface geothermal fluid at Pilgrim Hot Springs. In order to 1 maintain the long term health of the geothermal field, t ' careful monitoring of the aquifer is necessary. The -„,41 temperature gradient wells that were drilled in 2012 are ideally situated to monitor the temperatures of both the shallow and the deep aquifers at Pilgrim Hot Springs. 2.19-in OD casing cemented from land surface to 993 ft. ' Because these wells are sealed from the aquifer,the risks associated with leaving these wells open are extremely limited. Rubber cement plug tri bottom otcasing in addition to this larger geothermal power generation s5r8-Inhole facility being explored,the property owners of Pilgrim Hot drilled to 1183 ft. Springs, are veryinterested in developing the site for Grout-filled from 993 to 1183 ft Figure2.PS 12-3 small scale tourism use. Some of the uses for the geothermal waters that have been discussed include a small geothermal power plant for Temperature Profile of PS12-2 onsite electrical power generation, a small geothermal on 6 September 2014 district heating loop to provide space heating and snow melting, Temp(°C) and of course hot soaking pools. 0 20 40 60 80 100 Just as in the large scale 0 geothermal power plant scenario 200 described above, using the 17: 400 geothermal resource for onsite 600production will require careful Q- 800 ._..__-.__.__.._... monitoring of the geothermal 1000 resource. The temperature 1200 gradient wells that were drilled 1400 in 2012 provide an excellent tool Figure 3.The temperature profile of PS 12-2 shows gives the static state to do this with. temperature of the geothermal aquifer • • PS13-1 was drilled in 2013. It was originally drilled to bedrock at 1036 feet, but when temperatures at this depth were cooler than had been hoped for,the well was completed in the shallow thermal aquifer. This well,shown in figure 4 was completed with 14"casing and well screen. The well has an artesian flow rate of approximately 70 gpm at 175°F.The closed in pressure at the wellhead is approximately 3.5 PSI. In September of 2013 the well was flow tested at 300 gpm,and had productivity measured at 27.5 gpm/psi, indicating a good productive well. This well has excellent potential to produce geothermal fluid for onsite district heating and power production purposes which the landowners are in the process of evaluating. PS-13-1 Completion Well Diagram ,14"casing to surface CdOUnd Level 24-Conductor Casing 21'-- - `-18"Surface Casing Gravel Backfill `Class C Neat Cement um*.W(11101 1'Bentonite Crumbles Packer at SO' 11!' 188' WI ! I X)5O'Well Screen S`Tall Pipe wfPlate _..... 238'MD Welded to Bottom 14" —243'MD 2'Cement Plug Back Filled with Sand BOS'MD 231'of 2''Galvanized Pipe -1036'MD Figure 4.PS 13-1 well schematic • • • 0 ',i ,"1i ill;t OIJE n t!Pt'AR f1 March 21,2017 Bering Straits Native Corporation PO Box 1008 4600 DeBarr Road,Suite 200 Nome,Alaska 99762 Anchorage,AK 99508 Dear Gail, Pilgrim Hot Springs Geothermal Project Graphite One Resources is interested in the potential for Pilgrim Hot Springs to provide geothermally generated power to our proposed Graphite Creek Project and wish to explore this possibility with Bering Straits Native Corporation in its role as managing partner of Unaatuq, LLC, the owner of Pilgrim Hot Springs. Graphite One Resources Inc. continues to develop its Graphite One Project with its proposed graphite mine and mineral processing plant to be situated about 20 miles west of Pilgrim Hot Springs. A power demand of six megawatts at full production was estimated in total for these two facilities in the project's recently released Preliminary Economic Assessment ("PEA"), the first engineering report assessing the economic viability of the project's graphite resources. This study assumes the power requirements would be supplied by three,two-megawatt,diesel fired generators. We wish to explore with you the possibility of a geothermal generation facility at Pilgrim Hot Springs supplying all,or some of,this estimated demand. The Graphite One Project is proposed as a vertically integrated enterprise to mine, process and manufacture high grade coated spherical graphite ("CSG") primarily for the lithium-ion electric vehicle battery market. As set forth in the PEA, potential graphite mineralization mined from the Company's Graphite Creek Property, is expected to be processed into concentrate at a plant adjacent to the mine. The Graphite Creek Property is situated about 37 miles north of Nome. CSG and other value-added graphite products, would likely be manufactured from the concentrate at the Company's proposed graphite product manufacturing facility,the location of which is the subject of further study and analysis. We look forward to the opportunity to work with you on this. An economic alternative to diesel generated power would be a major enhancement to our project. Yours truly, 77, . Doug Smith Executive Chairman GRAPHITE ONE RESOURCES INC. 604.240.6016 Do ugS@gra phiteoneresources.com 600—777 Hornby Street I Vancouver,British Columbia I V6Z 154 • • Bettis, Patricia K (DOA) -?rJ From: Bettis, Patricia K (DOA) Sent: Tuesday,June 13, 2017 2:28 PM To: Matt Ganley Subject: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126) Matt, Please submit immediately the required sundry applications for PS 12-1 (PTD 212-077), PS 12-2 (212-109), and PS 12-3 (PTD 212-126). See emails below. Original Message From: Matt Ganley [mailto:mganley@beringstraits.com] Sent:Thursday, May 4, 2017 2:46 PM To: Bettis, Patricia K(DOA)<patricia.bettis@alaska.gov> Subject: RE: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126): Denial of Sundry Applications for Suspension of Wells Thank you Patricia. I will send those along. Matt L. Ganley SCANNED JO ''_ V.P. Media and External Affairs Bering Straits Native Corporation 4600 DeBarr Road,Suite 200 I Anchorage,AK 99508 Phone 907.563.3788 Direct 907. 344.7212 I Mobile 907.632.7197 mganley@beringstraits.com I www.beringstraits.com WARNING:The information contained in this email (including any attachments) is CONFIDENTIAL and may be PRIVILEGED. If you are not the intended recipient of this email,you may not read, retain, copy,or distribute this email. If you have received this email in error, please advise us by return email and call the sender at 907.632.7197.Thank you. From: Bettis, Patricia K(DOA)<mailto:patricia.bettis@alaska.gov> Sent:Thursday, May 4, 2017 3:40 PM To: Matt Ganley<mailto:mganley@beringstraits.com> Subject: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126): Denial of Sundry Applications for Suspension of Wells Good afternoon Matt, Thank you for your letter dated April 12, 2017 concerning the above mentioned Pilgrim Springs wells. By letters dated January 18, 2017, Sundry Applications No. 315-746, No.315-747, and No. 315-748 were denied as the AOGCC lacked sufficient information to determine that suspension of the PS 12-1, PS 12-2 and PS 12-3 wells was appropriate under 20 AAC 25.110(a)(2). Within 20 days of that date, Bering Straits Native Corporation had the right to file applications for reconsideration. 1 • In light of Graphite One Resources Inc. showing an interest in the potential for pilgrim Hot Springs to provide geothermally generate power to the proposed Graphite Creek Project, please submit new sundry applications for the suspension of the wells under 20 AAC 25.110. A sundry application must be submitted for each well. If you have any questions concerning the matter, please do not hesitate to contact me. Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Ave.,Ste 100 Anchorage,AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,and, so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793- 1238 or patricia.bettis@alaska.gov<mailto:patricia.bettis@alaska.gov>. 2 • • Bettis, Patricia K (DOA) ft 'V Z_/.(a From: Bettis, Patricia K(DOA) Sent: Tuesday,July 11, 2017 3:22 PM To: Matt Ganley Subject: RE: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126) Matt, The AOGCC will not process the sundry applications until the original documents are received. Please forward ASAP. Thank you, Patricia Original Message N��® JUL7 201 From: Matt Ganley [mailto:mganley@beringstraits.com] Sent:Saturday,June 24,2017 12:49 PM To: Bettis, Patricia K(DOA)<patricia.bettis@alaska.gov> • Subject: RE: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126) Patricia- Please find, attached the sundry applications(Form 10-403 and supporting materials)for the Temperature gradient wells at Pilgrim Hot Springs: PS 12-1(PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126). I am sending the original documents via standard USPS to your office address. If you require any additional information please let me know. Regards, Matt L. Ganley V.P. Media and External Affairs Bering Straits Native Corporation 4600 DeBarr Road,Suite 200 I Anchorage,AK 99508 Phone 907.563.3788 Direct 907.344.7212 I Mobile 907.632.7197 mganley@beringstraits.com I www.beringstraits.com WARNING:The informationcontained in this email (including any attachments) is CONFIDENTIAL and may be PRIVILEGED. If you are not the intended recipient of this email,you may not read, retain,copy, or distribute this email. If you have received this email in error, please advise us by return email and call the sender at 907.632.7197.Thank you. Original Message From: Bettis, Patricia K(DOA) [mailto:patricia.bettis@alaska.govj Sent:Tuesday,June 13,2017 2:28 PM To: Matt Ganley Subject: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126) 1 Matt, Please submit immediately the required sundry applications for PS 12-1 (PTD 212-077), PS 12-2 (212-109),and PS 12-3 (PTD 212-126). See emails below. Original Message From: Matt Ganley [mailto:mganley@beringstraits.comj Sent:Thursday, May 4,2017 2:46 PM To: Bettis, Patricia K(DOA)<patricia.bettis@alaska.gov> Subject: RE: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126): Denial of Sundry Applications for Suspension of Wells Thank you Patricia. I will send those along. Matt L. Ganley V.P. Media and External Affairs Bering Straits Native Corporation 4600 DeBarr Road, Suite 200 I Anchorage,AK 99508 Phone 907.563.3788 Direct 907.344.7212 I Mobile 907.632.7197 mganley@beringstraits.com I www.beringstraits.com WARNING:The information contained in this email (including any attachments) is CONFIDENTIAL and may be PRIVILEGED. If you are not the intended recipient of this email,you may not read, retain, copy,or distribute this email. If you have received this email in error, please advise us by return email and call the sender at 907.632.7197.Thank you. From: Bettis, Patricia K(DOA)<mailto:patricia.bettis@alaska.gov> Sent:Thursday, May 4, 2017 3:40 PM To: Matt Ganley<mailto:mganley@beringstraits.com> Subject: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126): Denial of Sundry Applications for Suspension of Wells Good afternoon Matt, Thank you for your letter dated April 12, 2017 concerning the above mentioned Pilgrim Springs wells. By letters dated January 18, 2017, Sundry Applications No. 315-746, No. 315-747,and No. 315-748 were denied as the AOGCC lacked sufficient information to determine that suspension of the PS 12-1, PS 12-2 and PS 12-3 wells was appropriate under 20 AAC 25.110(a)(2). Within 20 days of that date, Bering Straits Native Corporation had the right to file applications for reconsideration. In light of Graphite One Resources Inc. showing an interest in the potential for Pilgrim Hot Springs to provide geothermally generate power to the proposed Graphite Creek Project, please submit new sundry applications for the suspension of the wells under 20 AAC 25.110. A sundry application must be submitted for each well. If you have any questions concerning the matter, please do not hesitate to contact me. Thank you, Patricia Patricia Bettis 2 Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Ave.,Ste 100 Anchorage,AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793- 1238 or patricia.bettis@alaska.gov<mailto:patricia.bettis@alaska.gov>. 3 • • Bettis, Patricia K (DOA) 7/, (2./ -/,2C From: Matt Ganley <mganley@beringstraits.com> Sent: Thursday, May 4, 2017 2:46 PM To: Bettis, Patricia K(DOA) Subject: RE: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126): Denial of Sundry Applications for Suspension of Wells Thank you Patricia. I will send those along. Matt L. Ganley CANED MAY 0 Z017, V.P. Media and External Affairs Bering Straits Native Corporation 4600 DeBarr Road, Suite 200 I Anchorage, AK 99508 Phone 907.563.3788 Direct 907. 344.7212 I Mobile 907.632.7197 mganley@beringstraits.com www.beringstraits.com WARNING:The information contained in this email (including any attachments) is CONFIDENTIAL and may be PRIVILEGED. If you are not the intended recipient of this email,you may not read, retain, copy,or distribute this email. If you have received this email in error, please advise us by return email and call the sender at 907.632.7197.Thank you. From: Bettis, Patricia K(DOA)<mailto:patricia.bettis@alaska.gov> Sent:Thursday, May 4, 2017 3:40 PM To: Matt Ganley<mailto:mganley@beringstraits.com> Subject: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126): Denial of Sundry Applications for Suspension of Wells Good afternoon Matt, Thank you for your letter dated April 12, 2017 concerning the above mentioned Pilgrim Springs wells. By letters dated January 18, 2017, Sundry Applications No. 315-746, No. 315-747, and No. 315-748 were denied as the AOGCC lacked sufficient information to determine that suspension of the PS 12-1, PS 12-2 and PS 12-3 wells was appropriate under 20 AAC 25.110(a)(2). Within 20 days of that date, Bering Straits Native Corporation had the right to file applications for reconsideration. In light of Graphite One Resources Inc. showing an interest in the potential for Pilgrim Hot Springs to provide geothermally generate power to the proposed Graphite Creek Project, please submit new sundry applications for the suspension of the wells under 20 AAC 25.110. A sundry application must be submitted for each well. If you have any questions concerning the matter, please do not hesitate to contact me. Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Ave.,Ste 100 Anchorage,AK 99501 1 0 • Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,and, so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907) 793- 1238 or patricia.bettis@alaska.gov<mailto:patricia.bettis@alaska.gov>. 2 • Bettis, Patricia K (DOA) '/fi;b to From: Bettis, Patricia K(DOA) Sent: Thursday, May 4, 2017 2:40 PM To: Matt Ganley Subject: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (212-109), PS 12-3 (PTD 212-126): Denial of Sundry Applications for Suspension of Wells Good afternoon Matt, Thank you for your letter dated April 12, 2017 concerning the above mentioned Pilgrim Springs wells. By letters dated January 18, 2017, Sundry Applications No. 315-746, No. 315-747, and No. 315-748 were denied as the AOGCC lacked sufficient information to determine that suspension of the PS 12-1, PS 12-2 and PS 12-3 wells was appropriate under 20 AAC 25.110(a)(2). Within 20 days of that date, Bering Straits Native Corporation had the right to file applications for reconsideration. In light of Graphite One Resources Inc. showing an interest in the potential for Pilgrim Hot Springs to provide geothermally generate power to the proposed Graphite Creek Project, please submit new sundry applications for the suspension of the wells under 20 AAC 25.110. A sundry application must be submitted for each well. If you have any questions concerning the matter, please do not hesitate to contact me. Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Ave.,Ste 100 Anchorage, AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 • • 2/01.-/V. • t. � G- is A06.(,)(,- April .()(,-April 12, 2017 Cathy P. Foerster MAYAlaska Oil and Gas Conservation Commission SCANNED 333 West Seventh Avenue Anchorage, AK 99501 RE: Request for Suspended status for wells PS-12-1 (212-077), PS-12-2 (212-109),and PS-12-3 212-126). Commissioner Foerster: This letter is in response to your letters of January 18th, 2017 concerning three geothermal temperature gradient wells on the Pilgrim Hot Springs property. The wells are numbered PS-12-1. PS-12-2, and PS-12- 3, and were drilled in 2012 as part of an ongoing geothermal assessment. At the time the wells were drilled, Unaatuq, LLC(the consortium of local Native organizations that own Pilgrim Hot Springs), was beginning to work towards the development of a geothermal electrical system to provide power to Nome, Alaska. Unfortunately,the economics that would have made the project feasible changed with the significant reduction in fuel prices. In December of 2015, we requested, on behalf of Unaatuq, LLC, that these wells be placed in suspended status because of their importance in any further research and development of the geothermal resource at Pilgrim Hot Springs. With the Application for Sundry Approvals,we provided a schematic of each well, as well as an explanation on the reason why the wells should be placed in suspended status. In short, these three wells are important for monitoring the fluid system when any testing or further development occurs on the property. They are necessary to fully utilize PS-13-1, a well which AOGCC approved "exploratory" status at the same time it denied the suspended status of the PS-12 wells. The P5-12 wells represent a significant investment and the plugging and abandoning of these assets would set back any future program that might use the resource for electrical generation or on-site power and heat. Asan example of the need for maintaining the wells, Unaatuq, LLC received a grant from USDA/NRCS in 2016 for an agricultural pilot program that is expected to utilize on-site electrical power and heat for the region's food security. In addition to the agricultural project, a mining interest is considering working with Unaatuq to establish a geothermal plant that could produce power for their graphite project some 20 miles from the Hot Springs. I have attached a letter from Graphite One expressing their interest in working on such a program. l-eliP o SIR N( . To summarize,we are requesting that the wells PS-12-1(212-077), PS-12-2(212-109), and PS-12-3 212- 126), remain in Suspended Status due to the ongoing agricultural program there(and the future need for on-site power and heat),the potential for powering the Graphite One mining program, and the need to keep these wells suspended for monitoring the reservoir when PS-13-1(213-102) is brought into production. I appreciate the work of the Commission and will submit additional materials to support our request if needed. Rega ds, Matt Gan .0 VP Media and External Affairs Bering Straits Native Corporation (Managing Partner for Unaatuq, LLC) y'o7-OX -7117 • 2/z �,.•:::.::.:ONE cesora.ss March 21,2017 Bering Straits Native Corporation PO Box 1008 4600 DeBarr Road,Suite 200 Nome,Alaska 99762 Anchorage,AK 99508 Dear Gail, Pilgrim Hot Springs Geothermal Project Graphite One Resources is interested in the potential for Pilgrim Hot Springs to provide geothermally generated power to our proposed Graphite Creek Project and wish to explore this possibility with Bering Straits Native Corporation in its role as managing partner of Unaatuq, LLC, the owner of Pilgrim Hot Springs. Graphite One Resources Inc. continues to develop its Graphite One Project with its proposed graphite mine and mineral processing plant to be situated about 20 miles west of Pilgrim Hot Springs. A power demand of six megawatts at full production was estimated in total for these two facilities in the project's recently released Preliminary Economic Assessment ("PEA"), the first engineering report assessing the economic viability of the project's graphite resources. This study assumes the power requirements would be supplied by three,two-megawatt,diesel fired generators. We wish to explore with you the possibility of a geothermal generation facility at Pilgrim Hot Springs supplying all,or some of,this estimated demand. The Graphite One Project is proposed as a vertically integrated enterprise to mine, process and manufacture high grade coated spherical graphite ("CSG") primarily for the lithium-ion electric vehicle battery market As set forth in the PEA, potential graphite mineralization mined from the Company's Graphite Creek Property, is expected to be processed into concentrate at a plant adjacent to the mine. The Graphite Creek Property is situated about 37 miles north of Nome. CSG and other value-added graphite products, would likely be manufactured from the concentrate at the Company's proposed graphite product manufacturing facility,the location of which is the subject of further study and analysis. We look forward to the opportunity to work with you on this. An economic alternative to diesel generated power would be a major enhancement to our project. Yours truly, Doug Smith Executive Chairman GRAPHITE ONE RESOURCES INC. 604.24.0.6016 D o ugS @g ra ph iteo neresou rce s.com 600—777 Hornby Street I Vancouver,British Columbia V6Z 154 • • V OF Tb ,,,,,,yy�„�� THE STATE Alaska Oil and Gas • N ;„ t � O Q T cl C� Conservation Commission . �L 1L�VJE`tel 1 -fix �� 333 West Seventh Avenue 'Vv-- GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 of - ,: *1.' Fax: 907.276.7542 www.aogcc.alaska.gov Matthew Ganley Vice President Unaatuq, LLCR ^^ ' 4600 Debarr Road, Suite 200 ��Ed �''° .1 f ti, Anchorage, AK 99508 Re: Pilgrim Hot Springs Field, Exploratory Pool, PS-12-3 Permit to Drill Number: 212-126 Sundry Number: 315-748 Dear Mr. Ganley: On December 15, 2015 Unaatuq, LLC (Unaatuq) submitted and application for sundry approval to suspend well PS-12-3. Since that time, the Alaska Oil and Gas Conservation Commission (AOGCC) has attempted to obtain additional documentation which would support Unaatuq's request. Unaatuq has not provided the information. Because AOGCC lacks sufficient information to determine that suspension of the PS-12-3 well is appropriate under 20 AAC 25.110(a)(2), the sundry application is denied. Because the PS-12-3 well does not meet the criteria to be placed in suspended status, within 90 days of the date of this denial,Unaatuq must submit for approval a sundry application with a viable plan to plug and abandon the PS-12-3 well. Within 20 days after this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, C-44/i° 41K4.414- Cathy P. Foerster Chair this I$ IS- DATED y of January, 2017. RDDNIS IA/ JAN 2 6 2017 • • RECEIVED STATE OF ALASKA �) p'� ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 AOGCC 1.Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown D Suspend N • Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill Li Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Unaatuq, LLC ' Exploratory ® • Development ❑ 212-126 . 3.Address: 4600 Debarr Road,Suite 200 Stratigraphic ❑ Service ❑ 6.API Number: Anchorage,AK 99508 50-031- a:•0-00-00 . 7.If perforating: 8.Well Name an. umber: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No ❑X / PS-1. =3 • (Previously PS-12-9) 9.Property Designation(Lease Number): 10.Field/Pool(s): Private/Unaatuq,LLC(USS 565) / Fa. Pilgrim Hot Springs • • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): Junk(MD): 1183 ft ' 1183 ft • 1183 ft ' -11R3ft- 993 ft 1065ft Casing Length Size MD TVD Burst Collapse Structural Conductor 5 ft 10 3/4" 5 ft /� . 5 ft Surface 144 ft 6 5/8" , 144 ft `0 144 ft Intermediate / Production 993 ft 2 19" 993 f 993 ft Liner Perforation Depth MD ft: Perforation Depth TVD(ft: Tub' • Size:( ) p ) e: Tubing Grade: Tubing MD(ft): N/A N/A , N/A N/A Packers and SSSV Type: ackers and SSSV MD(ft)and ND(ft): 12.Attachments: Proposal Summary ❑ We •• -s'i—atic '13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch Exploratory 7 • Stratigraphic❑ Development El Service El 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: OIL ❑ WINJ ❑ WDSPL ❑ Suspended ©' 16.Verbal Approval: Date: GAS ❑ WAG [] GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17.I hereby certify that the foregoing is true - d the procedure approved herein will not be deviated from without prio,written approval. Contact Matthew Ganley Email mganley@beringstraits.com Printed Name Matth Ganl-, Title VP Signature r' Phone —1-4—ate (907)344-7212 COMMISSION USE ONLY Conditions of approval: No Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial njection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No 2r Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: • Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate ORIGINAL RBDMIS li ,,JAN262017 • RECEIVED • BERING DEC 15 2015 Ire 4 StTRoAITS AOGCC X' w December 11, 2015 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Ms. Bettis: I am writing on behalf of Unaatuq, LLC the landowner of Pilgrim Hot Springs, in response to your communications of November 17 and November 23, 2015. BSNC is the managing partner of Unaatuq, LLC. According to your emails, AOGCC requires that Unaatuq. LLC submit: 1) An Application for Sundry Approvals (Form 10-403)for each well (P512-1, PS12- PS12-3 P513-1); 2) A well schematic diagram for each well; 3) A summary sheet noting the justification for maintaining the current status of each well. 4) The Report dated October 16, 2014, submitted by the Alaska Center for Energy and Power and titled, Utility of Maintaining Recent Wells at Pilgrim Hot Springs for Monitoring and On-Site Utilization. I have prepared a separate package of material for each well/permit, containing this cover letter and the information noted above in 1-3. Enclosed are the required forms and attendant paperwork. If there are any deficiencies or omissions in the enclosed paperwork, please notify me at your convenience. 14W Matt Gan VP Resources and External Affairs BSNC For Unaatuq, LLC. 4600 DeBarr Road,Suite 200 • Anchorage,Alaska 99508-3126 • 907.563.3788 • Fax 907.563 2742 • www.beringstraits.com • High-pressure ball valve 6 5/8-in OD conductor casing cemented to 144 ft below land surface 219-in OD casing cemented from land surface to 993 ft. Rubber cement plug in bottom of casing 5 5/8-in hole drilled to 1183 ft. Grout-filled from 993 to 1183 ft Schematic: PS 12-3: (Please refer to"Application for Application for Sundry Approvals,"Section 11 for Well Condition Summary). . al • ,.„ o) o ,.„m a) (r) Co a) L_ 4 C) .0 t 0 J 0 2 -1 O • c — C — CE -05 N Co 4) ro 4) CO '/7 '� C 3 a) C L C i C i OA a Co C CU co a) CO a) Co C 4O t D 0 o a a a 3 3 3 — 4-; -a oro o o a, 0 E ▪ � 4- on4-CO4- t v 3 V) CU o i o cu O u -a C C C •'-. u O- v 7 C i aO+ i C) i C) ro N U @ a)VI N 0 N 0 N O -0 CL) (0▪ = Q -0 Q -0 Q -O C) C _O Q E -o E -o E -° . a1 c 3 C cu C cu C N IX Y CO ++ CO +-+ CO 0 "� N CL rt.') L Co (O (O _ = U ,--I 13 VI cji c. (13 C0 E — O .0 CO 7 i 7 u 7 u C -O (O U C) 0.1 v CI) C) Q CD O O — E Q •a4+ a-+ a-+ a-+ 41 Q N v u) = 0 = 0 = 0 �' ' t O L s (O Y C C C •••••p = (N N m — 3 v c CO EpJ N CN CN C > Q "O L ,� aJ .— (n Co (/l co V) (O C C +' a) +-' 7 + 0_ U 0_ U 0_ U I— (o '4 � C m a mCa C 0 E To co) C CO cu a) Q 7 I- N 0 a.., 'O a) C) = ..tai V1 Lif = 3 (0 N .0 4. oa '� 4- 0 E VI OD O M •C N n 0_ v v co i V) _ -p t Q a) N 0 "O 'n -0 "r3 C y0 Y O VI:11 ' C 0_ YO 4-, C) E a, O ++ _Y C) E ct O ate+ "p 'O -6 "p � _c"' GC T LL V) C) N C) C) bn — Y -0 -0 -0 ••-• Q C D_ 0 O C C C C) L CLI Q Q Q E +., 4_. 3 00 U 0 (n V) V) U o O D o N -O E O vi a) v 0 2 U 7 ap C Z u CO 'a ch c C c 3 )--I a--1 ci O Ql to u4-) Y (n In (, Y G}' 0 j V I— 0_ 0_ J i Q ,--I 0 ,,_ >•• > >•• J iO 4' 0 OA (O a) (NJ O O Q C) CI) C) .0 lO � _ . vi Y E E L 5. 3 a) u 4-,fa 0 p - +-, a) 0 0 0 CO O C N CJ N (6 0 .0 c o C . ) Q Zc-i N C r-I = < �O •N N t N vQ)i N N N M U C d > D C) ci ,-i c-I a-+ C 3 N (n ()) N B "O -0 c ) E w CL 0_ O_ O_ a) N C O O r CO O N ] w L -0Ql N V C n7 L •L J O 7 O o a J GA O z I-- al lN V) 0- ) 0 ' .-i .O O' Co *) E o CD o v c, N N N M N N O C Cr) 0 C) c-I c-I e-( •-I V) 0 CL N D v v d N N N N aD m Q a-��2� DEC 2015 73r6Utility of Maintaining Recent Wells at Pilgrim Hot Springs for Monitoring and On-Site Utilization CC October 17, 2014 By the Alaska Center for Energy and Power Since 2010, the Alaska Center for Energy and Power has been leading geothermal exploration efforts at Pilgrim Hot Springs. The property is owned by Unaatuq LLC., a partnership of seven organizations based on the Seward Peninsula. In 2012 and 2013 four wells were drilled on the property which fall under the jurisdiction of the Alaska Oil and Gas Conservation Commission. The wells drilled during this period are best left open and operational as a means to monitor the geothermal aquifer, and in the case of PS13-1 provide geothermal fluid for onsite use. Three of these wells, called P512-1, PS12-2, and PS 12-3 were drilled as temperature gradient holes to 1 High-pressure ball valve 11.1 High-pressure ball valve �M I fl 6 518-in OD conductor casing 6 5/8-in OD conductor casing cemented to 100 ft below cemented to 200 ft belnw • land surface N land surface •► J 4.5-in OD casing cemented to 1000 ft 'r below land surface 4.5-in OD casing cemented to 1000 ft below land surface 2.19-in OD casing cemented t' from land surface to 160 ft below land surface.Grouted from 160 to 1294 ft below land surface. ..m..;r .- ..:.. Bottom cap 1Igure 1.PS 12-1(lett)and PS 12-2(right) depths ranging from 1000 feet to 1294 feet. Diagrams of these wells are shown in figures 1-2. These wells are constructed with sealed casing which is plugged at the bottom. The casing is not perforated and the wells are not open to the formation. They do not have ability to flow artesian as other perforated wells at the site do. Once the wells were completed,the casing was filled with water and they serve as temperature gradient monitoring wells. Temperature logs, like the one shown in figure 3 are created using the temperature profiles measured in the wells. These wells are very useful for monitoring subtle long term changes in the geothermal field. • • Currently,there are plans to develop Pilgrim Hot Springs to generate electricity and export this power to Nome. A private developer, under the name Pilgrim High-pressure ball valve -r� Geothermal LLC., has signed a power purchase agreement with Nome Joint Utility Systems to supply up to two MW of electrical power to the utility. This would 6 518-in OD conductor casing cemented to 144ftbelow - require the extraction and reinjection of large amounts of land surface 1 I geothermal fluid at Pilgrim Hot Springs. In order to maintain the long term health of the geothermal field, careful monitoring of the aquifer is necessary. The temperature gradient wells that were drilled in 2012 are ideally situated to monitor the temperatures of both the shallow and the deep aquifers at Pilgrim Hot Springs. 2.19-in OD casing cemented from land surface to 993 ft. Because these wells are sealed from the aquifer,the risks associated with leaving these wells open are extremely limited. Rubber cement plug in bottom of casing ►� In addition to this larger geothermal power generation 5518-in hole I facility being explored, the property owners of Pilgrim Hot drilled to 1183 Grout-filled from rom Springs, are very interested in developing the site for 993 to 1183 ft. small scale tourism use. Some of h Figure 2.PS 12-3o ethe gu geothermal waters that have been discussed include a _, small geothermal power plant for Temperature Profile of PS12-2 onsite electrical power generation, a small geothermal on 6 September 2014 district heating loop to provide space heating and snow melting, Temp(°c) and of course hot soaking pools. 0 20 40 60 80 100 Just as in the large scale 200 — -- -- ---- — . j geothermal power plant scenario 400 — — _�_ V� _ _ described above, using the LL geothermal resource for onsite -- 600 — — --- 800 production will require careful monitoring of the geothermal 1000 --- — resource. The temperature 1200 gradient wells that were drilled 1400 [__. in 2012 provide an excellent tool Figure 3.The temperature profile of PS 12-2 shows gives the static state to do this with. temperature of the geothermal aquifer • • PS13-1 was drilled in 2013. It was originally drilled to bedrock at 1036 feet, but when temperatures at this depth were cooler than had been hoped for, the well was completed in the shallow thermal aquifer. This well, shown in figure 4 was completed with 14" casing and well screen. The well has an artesian flow rate of approximately 70 gpm at 175° F.The closed in pressure at the wellhead is approximately 3.5 PSI. In September of 2013 the well was flow tested at 300 gpm, and had productivity measured at 27.5 gpm/psi, indicating a good productive well. This well has excellent potential to produce geothermal fluid for onsite district heating and power production purposes which the landowners are in the process of evaluating. PS-13-1 Completion Well Diagram 14 casing to surface Gwurxl Level Ip2 24"Conductor Casing ix I 21 _ a - —18'Surface Casing Gravel Backfill - _ — _—— _ Class C Neat Cement shale Pat ket 1'Bentonite Crumbles----- -- ____ `;._.Packer at 5U' — 18" 140' I — 188' .%50'Well Screen S'Tail Pipe w/Plate — _— �_—_.__238'MD Welded to Bottom 14" -_- 243MD 2'Cement Plug — — Back Filled with Sand ---3 718" cams 805'MO 231'of 2"Galvanized Pipe — — 1036'MD Figure 4.PS 13-1 well schematic • • Bettis, Patricia K (DOA) -6 off ) /a( From: Matt Ganley <mganley@beringstraits.com> Sent: Tuesday, May 03, 2016 2:26 PM To: Bettis, Patricia K(DOA) Subject: RE: Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1(PTD Nos. 212-077, 212-109, 212-126 and 213-102) Patricia, Thank you for the notification. I was assured by Mr.Trott that he would follow up with you,so I'll contact him, again. I would also like to update you (and I will submit an updated suspension request)to tell you that we have received an NRCS(Dept. Of Agriculture)for a pilot program to reintroduce agricultural production to the property and continue to work with ACEP on deploying on site geothermally produced electricity. We are also improving the bathing pool this summer for public use. All of these activities will need the use of the remaining wells. I will explain in more detail within the amended paperwork. Matt L. Ganley V.P. Media and External Affairs Bering Straits Native Corporation 4600 DeBarr Road, Suite 200 I Anchorage,AK 99508 Phone 907.563.3788 Direct 907. 344.7212 Mobile 907.632.7197 mganley@beringstraits.com J www.beringstraits.com From: Bettis, Patricia K(DOA)<mailto:patricia.bettis@alaska.gov> Sent: Monday, May 2, 2016 2:48 PM To: Matt Ganley<mailto:mganley@beringstraits.com> Subject: FW: Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1(PTD Nos. 212-077, 212-109, 212-126 and 213-102) Matt, In regards to our email exchange below, the AOGCC has not received any information on Pilgrim Geothermal LLC. I am still holding the sundry applications for suspension of the PS 12-1, PS 12-2, PS 12-3 and PS 13-1. Under regulation 20 AAC 25.110, an operator may apply to the AOGCC to approve the suspension of a well. The operator must state the reasons why each well should be suspended, and not completed or abandoned. This includes demonstrating that each well has a practical future utility. If a geothermal electric generation project is not in the works, then Unaatuq, LLC needs to provide justification on why the wells should be suspended, and not completed or abandoned. Thank you, Patricia Original Message From: Matt Ganley [mailto:mganley@beringstraits.com] Sent: Monday,January 04, 2016 3:39 PM To: Bettis, Patricia K (DOA)<patricia.bettis@alaska.gov> Subject: RE: Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1(PTD Nos. 212-077, 212-109, 212-126 and 213-102) 1 • • S • Thank you Patricia. I have contacted the company and requested that they send to appropriate information to you. Matt L. Ganley V.P. Media and External Affairs Bering Straits Native Corporation 4600 DeBarr Road, Suite 200 I Anchorage,AK 99508 Phone 907.563.3788 Direct 907. 344.7212 I Mobile 907.632.7197 mganley@beringstraits.com www.beringstraits.com<http://www.beringstraits.com> From: Bettis, Patricia K(DOA)<mailto:patricia.bettis@alaska.gov> Sent: Monday,January 4, 2016 4:26 PM To: Matt Ganley<mailto:mganley@beringstraits.com> Subject: Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1(PTD Nos. 212-077, 212-109, 212-126 and 213-102) Good afternoon Matt, In reference to the statement in the applications that Unaatuq has a letter of Intent and MOU with Pilgrim Geothermal LLC for future development of a geothermal electric generation project, a search of the Corporations Database, Department of Commerce, Community and Economic Development, shows that Pilgrim Geothermal LLC does not hold a license to conduct business in the State of Alaska. Would you please provide more information on Pilgrim Geothermal LLC. Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793- 1238 or patricia.bettis@alaska.gov<mailto:patricia.bettis@alaska.gov>. 2 • • Bettis, Patricia K (DOA) PTA QJ z- /a.(.. From: Bettis, Patricia K (DOA) Sent: Monday, May 02, 2016 1:48 PM To: 'Matt Ganley' Subject: FW: Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1(PTD Nos.212-077, 212-109, 212-126 and 213-102) Matt, In regards to our email exchange below,the AOGCC has not received any information on Pilgrim Geothermal LLC. I am still holding the sundry applications for suspension of the PS 12-1, PS 12-2, PS 12-3 and PS 13-1. Under regulation 20 AAC 25.110, an operator may apply to the AOGCC to approve the suspension of a well. The operator must state the reasons why each well should be suspended, and not completed or abandoned. This includes demonstrating that each well has a practical future utility. If a geothermal electric generation project is not in the works,then Unaatuq, LLC needs to provide justification on why the wells should be suspended, and not completed or abandoned. Thank you, Patricia Original Message From: Matt Ganley [mailto:mganley@beringstraits.com] Sent: Monday,January 04, 2016 3:39 PM To: Bettis, Patricia K(DOA)<patricia.bettis@alaska.gov> Subject: RE: Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1(PTD Nos. 212-077, 212-109, 212-126 and 213-102) Thank you Patricia. I have contacted the company and requested that they send to appropriate information to you. Matt L. Ganley V.P. Media and External Affairs Bering Straits Native Corporation 4600 DeBarr Road, Suite 200 I Anchorage, AK 99508 Phone 907.563.3788 Direct 907.344.7212 I Mobile 907.632.7197 mganley@beringstraits.com ( www.beringstraits.com From: Bettis, Patricia K(DOA)<mailto:patricia.bettis@alaska.gov> Sent: Monday,January 4, 2016 4:26 PM To: Matt Ganley<mailto:mganley@beringstraits.com> Subject: Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1(PTD Nos. 212-077,212-109, 212-126 and 213-102) Good afternoon Matt, In reference to the statement in the applications that Unaatuq has a letter of Intent and MOU with Pilgrim Geothermal LLC for future development of a geothermal electric generation project,a search of the Corporations Database, Department of Commerce,Community and Economic Development, shows that Pilgrim Geothermal LLC does not hold a ! • license to conduct business in the State of Alaska.Would you please provide more information on Pilgrim Geothermal LLC. Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,and, so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793- 1238 or patricia.bettis@alaska.gov<mailto:patricia.bettis@alaska.gov>. 2 Cat • • c,l I M 0 CO I Q v a Z CD H V $,[ 47..,... io a) C a) u CM C.•y M O O w a) 0) t. cow 4.; ..- To r .O E O) 0 V d r '0 M CI) p d � O � d 00 'a et � � E p s O _ � mo pr- _cm E c a lic� � E V O d 'w"" N 03 y o Ncn O ' V N p N CU t E E V O) C Z N t • • Bettis, Patricia K (DOA) ?it I1-j 2 S, From: Bettis, Patricia K (DOA) Sent: Tuesday, November 17, 2015 12:05 PM To: 'Matt Ganley' Subject: Pilgrim S•rin. -othermal Wells: PS 12-1 (PTD 212-077), PS 12-2 (PTD 212-109), PS 12-3 (PTD 212-126), nd PS 13-1 (PTD 213-102) Good afternoon Matt, As per my email dated January 29, 2015, Unaatuq, LLC cannot leave PS 12-1, PS 12-2, PS 12-3 and PS 13-1 in the current status quo. Under regulation 20 AAC 25.110, an operator may apply to the AOGCC to approve the suspension of a well. The operator must state the reasons why each well should be suspended, and not completed or abandoned. This includes demonstrating that each well has a practical future utility. A separate application is required for each individual well. An Application for Sundry Approvals form (Form 10-403)for the submittal of a plan of abandonment or a plan of suspension for a well can be found at htto://doa.alaska.gov/ogc/forms/forms.html. Note, a current well schematic diagram must be submitted with each Application for Sundry Approvals and a proposed well schematic diagram shall also be submitted with the application to show proposed downhole well design changes for plug and abandonment plans. All information required by 20 AAC 25.110 must be included or the application will be denied and the AOGCC will at that time will look to Unaatuq, LLC to plug and abandoned the wells in conformance with State Regulations. Please submit to the AOGCC, within fifteen (15) business days from the date of this email, the required sundry applications for suspension or abandonment of PS 12-1, PS 12-2, PS 12-3 and PS 13-1. If applications for the suspension or abandonment of the wells are not received in that time frame, the AOGCC may issue Notices of Violation under 20 AAC.535 for violation or failure to comply with a provision of AS 31.05 and Title 20, Chapter 25 of the Alaska Administration Code. If you have questions, please do not hesitate to call me. Best Regards, Patricia APR 1 8 2,016 SCONE° Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law. If 1 • • you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or aatricia.bettis@alaska. ov. From: Bettis, Patricia K(DOA) Sent:Thursday,January 29, 2015 2:10 PM To: matt@beringstraits.com Cc: Colombie,Jody J (DOA)<jody.colombie@alaska.gov> Subject: Pilgrim Springs Geothermal Wells (Docket No: OTH-14-019) Matt, This email is to summarize our phone conversation on January 28, 2015, regarding the Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1 geothermal wells. If AOGCC approves Unaatuq, LLC's request to be designated operator, Unaatuq, LLC will bear full responsibility for assuring those wells are in compliance with all of AOGCC's statutes, regulations and orders. Unaatuq, LLC is responsible for knowledge of those statutes, regulations and orders. Regarding the status of Unaatuq, LLC's request to approve the change in operator, the submitted documentation is incomplete. Specifically Unaatuq, LLC needs to submit a signed copy of the September 12, 2014 Unaatuq, LLC Management Board Meeting, signed by a Management Board Member. Unaatuq, LLC also understands that the wells shall not be left in the current status quo. If Unaatuq, LLC does not demonstrate to AOGCC that the wells should be suspended, and not completed and put into production or abandoned, then the AOGCC will likely order the wells be property plugged and abandoned. See, 20 AAC 25.105 and 20 AAC 25.112. Responsibility for plugging and abandoning the wells, as well as all costs associated with the abandonment procedure, rests with Unaatuq, LLC. Applications for Sundry Approvals to suspend the wells must be submitted to the AOGCC within 15 business days of the date that AOGCC approves the change in operator. A separate application is required for each individual well. A Sundry application form (Form 10-403)for the submittal of a plan of abandonment or a plan of suspension for a well to the AOGCC can be found at: http://doa.alaska.gov/ogc/forms/forms.html. Note, a current well schematic diagram must be submitted with each Application for Sundry Approval and a proposed well schematic diagram shall also be submitted with the sundry application to show proposed downhole well design changes for plug and abandonment plans. All information required by 20 AAC 25.110 must be included or the application will be denied and the AOGCC will at that time will look to Unaatuq, LLC to plug and abandoned the wells to the satisfaction of the AOGCC. If you have questions, please do not hesitate to call me. Best Regards, Patricia Patricia Bettis 2 • • Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 3 • • Bettis, Patricia K (DOA) () 212 -/ZCz, From: Matt Ganley <mganley@beringstraits.com> Sent: Tuesday, November 17, 2015 2:08 PM To: Bettis, Patricia K (DOA) Subject: Re: Pil rim Springs Geothermal Wells: PS 12-1 (PTD 212-077), PS 12-2 (PTD 212-109), PS 12-3 (PTD 212-129nd PS 13-1 (PTD 213-102). Thank you. We will get the completed paperwork to you. Matt L. Ganley V.P. Media and External Affairs SCANNED APR 0016 Bering Straits Native Corporation 4600 DeBarr Road, Suite 200 I Anchorage,AK 99508<x-apple-data-detectors://7/1> Phone 907.563.3788<te1:907.563.3788> Direct 907. 344.7212<te1:907.%20344.7212> I Mobile 907.632.7197<te1:907.632.7197> mganley@beringstraits.com<mailto:mganley@beringstraits.com> www.beringstraits.com<http://www.beringstraits.com/> WARNING:The information contained in this email (including any attachments) is CONFIDENTIAL and may be PRIVILEGED. If you are not the intended recipient of this email,you may not read, retain, copy, or distribute this email. If you have received this email in error, please advise us by return email and call the sender at 907.632.7197<te1:907.632.7197>.Thank you. On Nov 17, 2015, at 1:05 PM, Bettis, Patricia K (DOA)<patricia.bettis@alaska.gov<mailto:patricia.bettis@alaska.gov» wrote: Good afternoon Matt, As per my email dated January 29, 2015, Unaatuq, LLC cannot leave PS 12-1, PS 12-2, PS 12-3 and PS 13-1 in the current status quo. Under regulation 20 AAC 25.110, an operator may apply to the AOGCC to approve the suspension of a well. The operator must state the reasons why each well should be suspended, and not completed or abandoned. This includes demonstrating that each well has a practical future utility. A separate application is required for each individual well. An Application for Sundry Approvals form (Form 10-403)for the submittal of a plan of abandonment or a plan of suspension for a well can be found at http://doa.alaska.gov/ogc/forms/forms.html. Note, a current well schematic diagram must be submitted with each Application for Sundry Approvals and a proposed well schematic diagram shall also be submitted with the application to show proposed downhole well design changes for plug and abandonment plans. All information required by 20 AAC 25.110 must be included or the application will be denied and the AOGCC will at that time will look to Unaatuq, LLC to plug and abandoned the wells in conformance with State Regulations. Please submit to the AOGCC, within fifteen (15) business days from the date of this email,the required sundry applications for suspension or abandonment of PS 12-1, PS 12-2, PS 12-3 and PS 13-1. If applications for the suspension or abandonment of the wells are not received in that time frame, the AOGCC may issue Notices of Violation under 20 • • AAC.535 for violation or failure to comply with a provision of AS 31.05 and Title 20, Chapter 25 of the Alaska Administration Code. If you have questions, please do not hesitate to call me. Best Regards, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907) 793- 1238 or patricia.bettis@alaska.gov<mailto:patricia.bettis@alaska.gov>. From: Bettis, Patricia K(DOA) Sent: Thursday,January 29, 2015 2:10 PM To: matt@beringstraits.com<mailto:matt@beringstraits.com> Cc: Colombie,Jody J (DOA) <jody.colombie@alaska.gov<mailto:jody.colombie@alaska.gov» Subject: Pilgrim Springs Geothermal Wells (Docket No: OTH-14-019) Matt, This email is to summarize our phone conversation on January 28, 2015, regarding the Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1 geothermal wells. If AOGCC approves Unaatuq, LLC's request to be designated operator, Unaatuq, LLC will bear full responsibility for assuring those wells are in compliance with all of AOGCC's statutes, regulations and orders. Unaatuq, LLC is responsible for knowledge of those statutes, regulations and orders. Regarding the status of Unaatuq, LLC's request to approve the change in operator, the submitted documentation is incomplete. Specifically Unaatuq, LLC needs to submit a signed copy of the September 12, 2014 Unaatuq, LLC Management Board Meeting, signed by a Management Board Member. Unaatuq, LLC also understands that the wells shall not be left in the current status quo. If Unaatuq, LLC does not demonstrate to AOGCC that the wells should be suspended, and not completed and put into production or abandoned, then the AOGCC will likely order the wells be property plugged and abandoned. See, 20 AAC 25.105 and 20 AAC 25.112. 2 0 • Responsibility for plugging and abandoning the wells, as well as all costs associated with the abandonment procedure, rests with Unaatuq, LLC. Applications for Sundry Approvals to suspend the wells must be submitted to the AOGCC within 15 business days of the date that AOGCC approves the change in operator. A separate application is required for each individual well. A Sundry application form (Form 10-403)for the submittal of a plan of abandonment or a plan of suspension for a well to the AOGCC can be found at: http://doa.alaska.gov/ogc/forms/forms.html. Note, a current well schematic diagram must be submitted with each Application for Sundry Approval and a proposed well schematic diagram shall also be submitted with the sundry application to show proposed downhole well design changes for plug and abandonment plans. All information required by 20 AAC 25.110 must be included or the application will be denied and the AOGCC will at that time will look to Unaatuq, LLC to plug and abandoned the wells to the satisfaction of the AOGCC. If you have questions, please do not hesitate to call me. Best Regards, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793- 1238 or patricia.bettis@alaska.gov<mailto:patricia.bettis@alaska.gov>. 3 Bettis, Patricia K (DOA) -i)Th PJ -,a4' From: Bettis, Patricia K (DOA) Sent: Monday, July 20, 2015 2:44 PM To: 'Matt Ganley' Subject: Pilgrim Springs PS 12-1 (PTD 212-077), PS 12-2 (PTD 212-109) PS 12-3 (PTD 212-126), and PS 13-1 (PTD 213-102) Good afternoon Matt, Unaatuq, LLC needs to submit Sundry Applications for the suspension of the PS 12-1, PS 12-2, PS 12-3 and PS 13-1 geothermal wells. A sundry application (Form 10-403) needs to be submitted for each well. Form 10-403 can be found on the AOGCC website at the following address: http://doa.alaska.gov/ogc/forms/forms.html. Under 20 AAC 25.110. Suspended wells, Unaatuq, LLC must state the reasons the wells should be suspended, and not completed or abandoned, and must demonstrate to the commission's satisfaction that the wells have future utility. Other requirements under 20 AAC 25.110 must also be met. The complete regulation may be found on the AOGCC website at the following address: http://www.legis.state.ak.us/basis/aac.asp#20.25.110. If you have any questions, please do not hesitate to call or email me. Thank you, Patricia Patricia Bettis Senior Petroleum Geologist SCANNED JUL 2 12015 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 411 Nv-T AS � E-44/k1L, ^ BERING W 1, 4.s.:stek.kiJek O�' ulo,l- ' - STRAITS a)j Native(.orporatIon November 25th,2014 Cathy P.Foerster,Commissioner State of Alaska Alaska Oil&Gas Conservation Commission 333 W.7th Ave. Anchorage,AK 99501-3539 RE: Pilgrim Springs Geothermal Wells Docket No:OTH-14-019 Nl�ii0 2Qt.t Commissioner Foerster: SCA �p This letter is in response to your letter dated September 12,2014 concerning the geothermal wells located at Pilgrim Hot Springs and identified as PS 12-1,PS 12-2,PS 12-3,and PS 13-1,which had been drilled by UAF's Alaska Center for Energy and Power(ACEP). Unaatuq,LLC and ACEP have worked diligently to define the geothermal resource at Pilgrim for the past 4 years,however,the current agreement between the parties ends on December 31,2014. It is anticipated that ACEP and Unaatuq will pursue joint projects that will further our understanding of the resource and bring its benefits to the residents of the region. Bering Straits Native Corporation serves as the managing member for Unaatuq,LLC,a consortium of seven organizations in the Bering Strait region who now own the property known as Pilgrim Hot Springs(Attachment A:U.S.Survey 565). Unaatuq,LLC and ACEP have been involved in a multi-year exploration and characterization program at the springs,with the ultimate goal of on-site development of the geothermal resource (greenhouses,district heating,electricity),and perhaps generating electricity for transmission to Nome. Your recent letter states that the wells at the hot springs must be "either plugged and abandoned in compliance with 20 MC 25.105 and 20 MC 25.112 or suspended under 20 MC 25.110." Unaatuq,LLC respectfully requests that we,as the landowners having a continued interest in developing the resources only available through the currently existing wells,be allowed to assume the responsibility as Operator. As Operator,Unaatuq,LLC would prefer to refrain from plugging,abandoning,or suspending the wells because further development of the geothermal resource is only possible if the wells remain functioning and accessible. For example,we are working with a company that intends to pursue electrical generation at Pilgrim,and intends to utilize the existing wells(12-1 to 12-3 and 13-1)for pump tests and reservoir monitoring. Closure of these wells would effectively set back any development for on-site geothermal use and electrical production for transmission to Nome. Attached you will find a statement outlining the Utility of Maintaining the Wells,which also contains a schematic for each well as requested in your letter(Attachment B). Through this correspondence we are requesting that the Operator of Record,currently listed as UAF/ACEP be changed to Unaatuq,LLC. We are submitting a completed Designation of Operator f„1 t r.,:�r3.Si+: lr_2011 • ft It '71 t 3,f ')r),E3f;.;126 • ,+.07 .?788 • i.;x Sq)7 2742 • +vIt1^,f.tit°a 111;ktt.43t;::c.rz� • • BERING " -* 4NotroaN BE pcsahon form(20 AAC 25.020) (Attachment C). On September 12, 2014,the Board of Directors for Unaatuq, LLC met and voted to assume the responsible for the wells as the operator,as well as be the agency to post the necessary bond with the State of Alaska for maintain the wells in their current,accessible status(Attachment D: Meeting Minutes,Excerpt). Please forward the required information,requirements and costs for submission of a bond to the State of Alaska to cover the wells,PS 12-1,PS 12-2,PS 12-3,and PS 13-1 to Matt Ganley,Bering Straits Native Corporation,4600 DeBarr Road,Suite 200,Anchorage,Alaska 99508. Sincerely, Matt Ganley Bering Straits Native Corporation,Managing Member Unaatuq,LLC (907)344-7212 L'R „: .. ._ Gwen Holdman University of Alaska Fairbanks Alaska Cen,-r for • • •nd Power,Director 40 o illi Kit Du e Univer ity of Alaska Facilities and Land Management,Associate Vice President Enclosures: U.S.Survey 565 Utility of Maintaining Recent Wells at Pilgrim Hot Springs for Monitoring and On-Site Utilization Designation of Operator Form 10-411 September 12,2014 Unaatuq,LLC Meeting Minutes Excerpt 4,00 1,•13.411 fir,,,,rj btiitt 2i){1 • And oi,+,r Aid`,s•t vi•1rFi 312e • 907'.,3 3 PP • c ix 90t X,•i/7,, • kCy'✓th'.IA'Ill,v•511 I f. t'ta17t • • ATTACHMENT A: U.S. Survey 565-Pilgrim Hot Springs • i i i •lisitiiiill • 1 giiii!I/ill 1 litill igVt4 liltd2 lill .. !gill i!IgPi! hI • o ::'``'}F) i1''r�._/Vtii;-.d,'4 f•s9k l: r:n t: s iY .: ' 1• } �K i3� �,-r:a:d�ti^r�i•+`,•N.4Kiv'"� e N 1 4 4k • } iv • • • estSrRrsrM'JaS . . 1d j • • 1 r; nvy0?•,' of • .. F ' .. , L • Fi.tIt'•*-'48'w-^it.lk .3..:.%v 1S t , '.rr�cfeA6raayLten 14 • 7"--4-1.47..... ........Nt-.. f -IPA % are '•,•_7 h t ti + , rf t � 1 I e F lif If Ili 11111111 1111 i 1 ii.' 1114 Fa=1111,11i itciii ' ,.t ., , . LI! ' lliilli f ict 11 • 4 1 e n _ $ EX LIC_UNIVERSITY_PNS_06I812 10 • • ATTACHMENT B: Utility of Maintaining Recent Wells At Pilgrim Hot Springs • . Utility of Maintaining Recent Wells at Pilgrim Hot Springs for Monitoring and On-Site Utilization October 17, 2014 Since 2010, the Alaska Center for Energy and Power has been leading geothermal exploration efforts at Pilgrim Hot Springs. The property is owned by Unaatuq LLC., a partnership of seven organizations based on the Seward Peninsula. In 2012 and 2013 four wells were drilled on the propertywhich fall under the jurisdiction of the Alaska Oil and Gas Conservation Commission. The wells drilled during this period are best left open and operational as a means to monitor the geothermal aquifer, and in the case of PS13-1 provide geothermal fluid for onsite use. Three of these wells, called PS12-1, PS12-2, and PS 12-3 were drilled as temperature gradient holes to 11/1E[all High-pressure ball valve n 6 5/84n OD conductor casing 6 5/84n OD conductor casing cemented to 100 ft below cemented to 200 ft below land surface land surface 4.54n OD casing cemented to 1000 ft below land surface 4.5-in OD casing cemented to 1000 ft below land surface 2.19ln OD casing cemented from land surface to 160 ft below land surface.Grouted from 160 to 1294 fl below land surface. ( Bottom cap MI Figure 1.PS 12-1 (left)and PS 12-2(right) depths ranging from 1000 feet to 1294 feet. Diagrams of these wells are shown in figures 1-2. These wells are constructed with sealed casing which is plugged at the bottom. The casing is not perforated and the wells are not open to the formation. They do not have ability to flow artesian as other perforated wells at the site do. Once the wells were completed,the casing was filled with water and they serve as temperature gradient monitoring wells. Temperature logs, like the one shown in figure 3 are created using the temperature profiles measured in the wells. These wells are very useful for monitoring subtle long term changes in the geothermal field. • • • Currently, there are plans to develop Pilgrim Hot Springs to generate electricity and export this power to Nome. A private developer, under the name Pilgrim High-pressure ball valve - 0. Mk Geothermal LLC., has signed a power purchase agreement with Nome Joint Utility Systems to supply up ., to two MW of electrical power to the utility. This would 6 5/8-in OD conductor casing cemented to14tftbelow require the extraction and reinjection of large amounts of land surface _ geothermal fluid at Pilgrim Hot Springs. In order to maintain the long term health of the geothermal field, L _ careful monitoring of the aquifer is necessary. The temperature gradient wells that were drilled in 2012 are ideally situated to monitor the temperatures of both the s shallow and the deep aquifers at Pilgrim Hot Springs. 2.19-in OD casing cemented from land surface to 993 ft. Because these wells are sealed from the aquifer,the risks associated with leaving these wells open are extremely limited. Rubber cement plug in bottom of casing ; ► In addition to this larger geothermal power generation 5sre-in hole facility being explored, the property owners of Pilgrim Hot drilled to11f3Springs, are veryinterested in developing the site for Grout-filled fromm p g 993 to 1183 ft. Figure 2.PS 12-3 small scale tourism use. Some of the uses for the geothermal waters that have been discussed include a small geothermal power plant for Temperature Profile of PS12-2 onsite electrical power generation, a small geothermal on 6 September 2014 district heating loop to provide space heating and snow melting, Temp(°C) and of course hot soaking pools. 0 20 40 60 80 100 Just as in the large scale 0 ' geothermal power plant scenario 200 described above, using the u_ 400 geothermal resource for onsite t600 production will require careful 0 800 monitoring of the geothermal 1000 resource. The temperature 1200 gradient wells that were drilled 1400 in 2012 provide an excellent tool Figure 3.The temperature profile of PS 12-2 shows gives the static state to do this with. temperature of the geothermal aquifer • PS13-1 was drilled in 2013. It was originally drilled to bedrock at 1036 feet, but when temperatures at this depth were cooler than had been hoped for, the well was completed in the shallow thermal aquifer. This well, shown in figure 4 was completed with 14" casing and well screen. The well has an artesian flow rate of approximately 70 gpm at 175° F.The closed in pressure at the wellhead is approximately 3.5 PSI. In September of 2013 the well was flow tested at 300 gpm, and had productivity measured at 27.5 gpm/psi, indicating a good productive well. This well has excellent potential to produce geothermal fluid for onsite district heating and power production purposes which the landowners are in the process of evaluating. PS-13-1 Completion Well Diagram ,..-14"casing to surface Ground Level 24"Conductor Casing 21'— 18"Surface Casing Gravel Backfill--- Class C Neat Cement -... �.r--shalePacke, 1'Bentonite Crumbles Packer at 50' 18' 140' IIIII111111111 188' IIII I I III1I111 11 1 I I I I I 1 I I I 1 I 50'Well Screen 5'Tail Pipe w/Plate I I I I I I I I I I I 1 I I 238'MD Welded to Bottom 14" —243'MD MM. — 2'Cement Plug Back Filled with Sand K 97I r-- - ew cam 805'MD ---- 231'of 2"Galvanized Pipe 1036'MD Figure 4.PS 13-1 well schematic • • ATTACHMENT C: Designation of Operator 20 AAC 25.020 I ! STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION DESIGNATION OF OPERATOR 20 AAC 25.020 1.Name and Address of Current Owner of Record: University of Alaska Fairbanks PO Box 755280 Fairbanks,Alaska 99775-5282 2.Notice is hereby given of a designation of operatorship for the oil and gas property described below: Legal description of property: U.S.Survey 565 Agregating approximatly 320 acres Refer to the attached map for representation of Lands described above. Property Plat Attached: El 3. Name and Address of Designated Operator: Unaatuq,LLC c/o Bering Straits Native Corporation P.O.Box 1008 Nome,Alaska 99762 4. Effective Date of Designation: 5. Acceptance of operatorship for the above described property with all attendant responsibilities and obligations is hereby acknowledged (attach Power of Attorney or other evidence of authority of person signing): Signature Date 2/t// Printed Name / .4,..t��E _ _ Title i.g I sw jr PAM Al /4 6. The Owner hereby certifies that the foregoing i true and correct(attach Power of Attorney or other evidence of authority of person signing): Signature �1..- r �� -- 1,� � Date 12/3/2014 Printed Name Gwen Holdmann Title Director,Alaska Center for Energy and Power 7. Approved: Commissioner Date Approved: Commissioner Date Approved: Commissioner Date (Requires approval by two Commissioners) Form 10-411 Rev.7/2009 Submit in duplicate • • ATTACHMENT D: Unaatuq, LLC Meeting Minutes Excerpt September 12, 2014 Unaatuq, LLC • • Management Board Meeting September 12, 2014 Call to Order Roy Ashenfelter called the Unaatuq, LLC Management Board meeting to order at 12:30 p.m. on September 12, 2014 in the BSNC Boardroom at Nome, Alaska. Roll Call Organization Representative Others present BSNC Clara Langton Robert Evans, Jerald Brown, Kevin Bahnke, Matt Ganley* Kawerak Kirsten Timbers, who took minutes MINC Thomas Denise Topkok, Daniel O. Komok, John Topkok, Ablowaluk Dora Hughes NSEDC Janis Ivanoff* Kyan Olanna* SNC Chuck Fagerstrom Andrew Miller Jr. TNC Isaac Okleasik Jr. William Topsekok WMNC Roy Ashenfelter Unaatuq Cheryl McKay* ACEP Gwen Holdmann *via teleconference Waive Notice of Meeting Roy Ashenfelter asked for a motion to waive the notice of the meeting. Clara Langton moved and William Topsekok seconded the motion to waive the notice of the meeting. Question called. Motion passed by voice vote. Wells Roy Ashenfelter asked for a motion to transfer the liability of the wells from ACEP to Unaatuq. Clara Langton moved and Isaac Okleasik second the motion to approve of the transfer of liability for Unaatuq wells PS 12-1, 2, 3 and PS 13-1, 2, 3 and transfer of the bond from ACEP to Unaatuq as required. Question called. Motion passed by voice vote. Matt Ganley requested that each organization send him a letter informing Unaatuq who their representative and alternates •OF • 4V/ THE1STTE . A 1 e,, 'k o � a Iticl. .a 333 West Seventh Avenue GOVERNOR SEAN PARNELL Anchorage, Alaska 99501-3572 Main: 907.279 1433 SLR\S rax: 907.2757562 September 12, 2014 CERTIFIED MAIL- RETURN RECEIPT REQUESTED 7012 3050 0001 4812 6808 (Unaatuq) 7012 3050 0001 4812 6815 (DCED) 7012 3050 0001 4812 6822 (UAF) Matt Ganley, Resources and External Affairs Unaatuq, LLC c/o Bering Straits Native Corporation P.O. Box 1008 Nome,AK 99762 Ms.Susan K. Bell, Commissioner Alaska Department of Commerce, Community,and Economic Development P.O. Box 110800 Juneau,AK 99811-0800 Gwen Holdmann, Director UAF Alaska Center for Energy&Power P.O. Box 755910 Fairbanks,AK 99775-5910 Re: Pilgrim Springs Geothermal Wells Docket No: OTH-14-019 Dear Mr.Ganley, Ms. Bell and Ms. Holdmann: As operators or landowner of record, you are advised that the ten geothermal wells drilled in the area of Pilgrim Springs, Alaska (see attached list) must either be plugged and abandoned in compliance with 20 AAC 25.105 and 20 AAC 25.112 or suspended under 20 AAC 25.110. Alaska Oil and Gas Conservation AOGCC regulations can be found at the following internet address: http://doa.alaska.gov/ogc/Regulations/Reglndex.html. A Sundry application form (Form 10-403) for the submittal of a plan of abandonment or a plan of suspension for a well to the AOGCC can be found at: http://doa.alaska.gov/ogc/forms/forms.html. Please note that each application for Sundry Approval must include a well schematic diagram showing the well's current condition and a well schematic diagram showing proposed downhole well design changes to comply with applicable regulations for plug and abandonment or suspension. Pilgrim Springs Geothermal Wells• September 12,2014 Page 2 of 2 If the AOGCC does not receive an acceptable plan and schedule for all ten wells within ninety (90) days of receipt of this letter, the AOGCC will notice a public hearing to determine whether remedial action is necessary with regard to the wells and which entity will bear responsibility for compliance. The applicable University of Alaska, Fairbanks Alaska Center for Energy& Power's (UAF) lease will be expiring soon relative to the PS# 12-1, PS 12-2, PS 12-3 and PS 13-1 wells. Under 20 AAC 25.105, all permitted wells on a property must be properly abandoned before expiration of the operator's rights. Upon expiration of the lease, if these wells are not plugged and abandoned to the satisfaction of the AOGCC, UAF's bond will be forfeited. Forfeiture of the bond will not relieve UAF of responsibility for plugging and abandoning of the wells under AS 31.05. If Unaatuq, LLC desires to take over operatorship of these four wells, a Designation of Operator Form (Form 10-411) must be submitted to and approved by the AOGCC, as provided under 20 AAC 25.020 in addition to filing the bond required by 20 AAC 25.025. Please call Ms. Patricia Bettis at (907) 793-1238 if you have question concerning this matter. Sincerely, i°90?-‘471( Cathy P Foerster Chair,Commissioner Attachment cc: Kit Duke,Associate Vice President University of Alaska Facilities and Land Management 1815 Bragaw St.,Ste. 101 Anchorage,AK 99508 Larry Hartig, Commissioner Department of Environmental Conservation P.O. Box 111800 Juneau,AK 99811-1800 • • r-, c ai E t u co 4- In C C C C C C= CU a) a) a) h- a + -,-+ 4-, + 1 ++ 4, C C C C Q O O O = = O a) a) Cl.) a) I- s t t t t .0 a 0. a 0- VI V). V) V) V) V) V) V) 3 7 O 7 V) V) V) V) 2 1' 0 U.) a1 0 M t0 p 0) 0 0 0 a1 O N O 01 00 M J t. 1 c-I N CO O 1 ec-1 0 Q .fi. a H 0 H 0 W W 01 0171 N N N N N N N M I- J N N 00 CO 00 CO e1 e1 a1 e1 Q 01 01 CT 01 al rn 0 0 0 0 O ce 11 e1 a-I a1 a1 1--1 N N N N 0 Ln 2 2 2 2 2 2 W CC CC CC CC CC CLY Y Y Y O Y Y Y Y Y Y a Q o -0 C m m M co m a CC U c cc cc cc cc cccccc cc 1r cc coo w J V) V) V). V) V) V) V) VI V) V) L Lll V) V) V) V1 I- I- I- H CUW O H F- F- I- t- F- 2 115. M M m M m ' '.° '° '° 4- O m 0 0 0 0 0 m M m m O C (9 0) a) a) a) o Z 3 3 3 3 > 2 * * * * * * 0 0 0 0 0 a a a a d L L L L L L r-% `� CC 3 3 3 3 3 3 "� 0 0 0 a >. a E U a a a a a a I °L'. L.0 Cl. C�7 00 o2S 02S 06 02f 02S 02$ 01.) c c c O w w w w J 0 00000 0D0 DDO 0000 0000 OA L L L L > CL ec t t t t t 0) o 0 0 0 0 C C C c C c L L L L O w w w w w w v a) v a) c) 4- 4- 4- 4- 4-, 4, a 0 0 0 0 0 0 c c c c E ccC C C C C C U U U CU CU 0 0 c d. O O o O O O co r0 r0 m 0 O of H H h N Y Y Y Y l0 '> '> '> '> '> '9 H to of N 5 0 0 5 p p co ca ca ca73 Q Q Q Q C Q Q Q Q Q Q LL w LL LL CO 0 0 0 0 0 0 QQQQ a)D D > > i a) 600 VI 0 Lr) L0 N 01 LO N E Z r-400 01 r•-• N N 0 NE E O O O N N N O x-1 a-1 a-1 O O 41 41 41 0 0 0 N N N M U F- N. I. N 1 1 1 1 0 0 0 eeee 0. a1 4-1 4-1 ei e1 e1 N N N N 0 .N C e1 N M Ln c W N M N N N E 2 on DO an MO on e-I 4 Q c c C c c 0 m Z aaaaao 0- V) V) N V) N LID t W E E E E E '^ N m a1 0 N N N M Q 0 a 'a 'a 'a 'a a a a a * _ m m ' N U.S. Postal ServiceTM m a CERTIFIED MAILTM RECEIPT a a } co (Domestic Mail Only;No Insurance Coverage Provided) > 0 0 '' ❑ N 0 43 u3 For delivery information visit our website at www.usps coma ;,i2 v? o •- co Postage $ Z f,., • E E ..11 -41 Certified Fee _ co 0 0 0 1 Q Postmark W ` v rC W k Return Receipt Fee y . > �, a0 (Endorsement Required) Here �� a ..m > a • Restricted DeliveryFee Z ,_ al S . 2/ 18 r� I N (Endorsement Required) W 7 .gam t' act m•g . a ir, 0 w o g rt i Total Postage a v } 2 U cc 5 y m Matt Ganley, Resources and External Affairs_ o " ; 0 0 0 c nj Sent To Unaatuq, LLC U m ci cd .*: Lii cc o p Street,Apt.No.i c/o Bering Straits Native Corporation ;,, _„ • ;, M1 or PO Box No. Post Office Box 1008cc City,State,ZIP- co rq N ru Nome,AK 99762 alk'" "`®' '" u, m 0 A 13 < m a, PS Form 3800:,. r.o . Q.� N =_ I = C N fa cil O O .__ moE o .yam a.9-.5 W _ U.S. Postal Service,., Lu a�, o o - o CERTIFIED MAILTM RECEIPT u) 0;) 2 e) E ro tr1 k 13 >,v0`-c Q ami > r_i (Domestic Mail Only;No Insurance Coverage Provided) co—TD to.. N u pp co W o = F Z O i t For delivery information visit our website at www.usps coma " N a C a o a p o tt t h -s J r lC ..E N �O ry >. 0 N C S.U 2 1 ? --i t/, m Crt Crl I ... N r co Postage $ U NCC ,. m v)"— C, —, Q, E Q c0 (1) 0.0 v c 0 .c u Q 7 r Certified Fee w av-L c€i a ® C7 4, a`, aO ai m " co O Return Receipt Fee Postmark p `� O �� t; m ar E <, N 1= (Endorsement Required) Here LIJ Z U*—'d rOn Q O ¢ j O O ! ly G u) ■ ■ ■ r u tl Z to Restricted Delivery Fee N fl O (Endorsement Required) VI 1:3Total Po . rn Ms.Susan K. Bell,Commissioner rU Sent To Alaska Department of Commerce,Community, r- • L7 Street Apt and Economic Development r- or PO Box City state; Post Office Box 110800 • Juneau,AK 99811-0800 bVuieri'sCetct U.S. Postal Service,. ru CERTIFIED MAILTM RECEIPT rru (Domestic Mail Only;No Insurance Coverage Provided) co For delivery information visit our website at www.usps.come ,, s t :' , EO Postage $ Certified Fee Return Receipt Fee Postmark O (Endorsement Required) Here Restricted Delivery Fee O (Endorsement Required) U") 0 Total I m Gwen Holdmann, Director Sent To ru a UAP Alaska Center for Energy & Power p Street,i N or POB Post Office Box 755910 __ ciry,sta Fairbanks, AK 99775-5910 O"L`10' -0" • • • SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY • Complete items 1,2,and 3.Also complete A. Signature item 4 if Restricted Delivery is desired. 0 Agent • Print your name and address on the reverse X 0 Addressee so that we can return the card to you. B. Received by(Printed Name) C. Date of Delivery • Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: D. Is deliverr�address different from item 1? 0 Yes If YES, lie a below: 0 No STATE OF,gLASK _ _: . OEPARrM Nr �FADMINIS jRgl1014 Ms.Susan K. Bell,Commissionerk CENTRAL MAIL SERtiICEF: Alaska Department of Commerce,Community, 3. Service Type and Economic Development 0 Certified Mail. 0 Priority Mall Express' Post Office Box 110800 0 Registered 0 Return Receipt for Merchandise Juneau„AK 99811-0800 0 Insured Mail 0 Collect on Delivery 4. Restricted Delivery?(Extra Fee) 0 Yes 2. Article Number (Transfer from service taneq 7012 3050 0001 4812 6815 PS Form 3811,July 2013 Domestic Return Receipt. U-C4k r•`A. p English Customer Service USPile • Register!Sign In U PS.CO r S PS /+L TM Customer Service U V r�V f'\�n g Have questions?We're here to help. .Tracking Number:70123050000148126822 Updated Delivery Day: Monday,September 15,2014 Product & Tracking Information Available Actions Postal Product: Features: Certified Mail TM Return Receipt After Mailing DATE&TIME STATUS OF ITEM LOCATION September 15,2014,8:15 Delivered FAIRBANKS,AK 99775 'am Your item was delivered at 8:15 am on September 15,2014 in FAIRBANKS,AK 99775. September 15,2014,8.14 Arrived at Unit FAIRBANKS,AK 99775 am September 13,2014,9:19 Departed USPS Facility ANCHORAGE,AK 99530 pm September 12,2014,9:06 Arrived at USPS Facility ANCHORAGE,AK 99530 pm Track Another Package Tracking(or receipt)number Track It HELPFUL LINKS ON ABOUT.USPS.COM OTHER USPS SITES LEGAL INFORMATION Contact Us About USPS Home Business Customer Gateway Privacy Policy Site Index Newsroom Postal Inspectors Terms of Use FAQs USPS Service Updates Inspector General FOIA Forms&Publications Postal Explorer No FEAR Act EEO Data Government Services National Postal Museum Careers Resources for Developers Copyright©2014 USPS.All Rights Reserved. 12/2/2014 • • Colombie, Jody J (DOA) From: Bettis, Patricia K (DOA) Sent: Tuesday, March 03, 2015 2:30 PM To: Colombie,Jody J (DOA) Subject: FW:ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Attachments: AppD_wellhead repairs.pdf For OTH-14-019 From: Alan P. Baldivieso [mailto:ABaldivieso@aidea.orq] Sent: Tuesday, March 03, 2015 1:00 PM To: Bettis, Patricia K (DOA); Schwartz, Guy L (DOA) Subject: RE: ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Thank you, Patricia. I spoke with Chris and he sent the attached report detailing the repairs that the University had done to some of the wellheads. Based on the conversation I had with Guy this morning, the application for sundry approvals will need to include specifics from the contractor that is ultimately selected to perform the work. I have identified several contractors that are familiar with the Pilgrim Hot Springs wells, but will need to accept bids through our procurement process prior to awarding the contract. I anticipate that the earliest the work can begin will be in July, although the road to the site may be clear of snow earlier than usual this year. I will specify that the work be completed by Sept 30,2015. Is this approach to plugging and abandoning the 6 wells acceptable? Thank you, Alan Baldivieso Program Manager Geothermal, Hydrokinetic, Emerging Energy Technologies Alaska Energy Authority (907) 771-3027 From: Bettis, Patricia K(DOA) [mailto:patricia.bettis@alaska.gov] Sent:Tuesday, March 03, 2015 11:51 AM To:Schwartz, Guy L(DOA) Cc:Alan P. Baldivieso Subject: ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Guy and Alan, This report may be of use to you. UAF may have worked on some of the wells. Christopher Pike may be able to provide you with that information. His telephone number is(907) 272-1522; cell is (907)888-3850. Regards, Patricia 1 0 0 • S m .',,,•.:' , - y . ,..,,. . . -411),L.• \*_,,/ ) , Figure 3.PS-3 1 1 t-4„it/,'' x r 'X r,'2 X� a "1h, a.. .: -.fin , y --`1:::‘„A.: i ,,..,, ,i-i,1 . ,,,,,..1!...."1. '' .. 1 , , .'-,f' .-...,. T [ .e: ” 3 � x it . $ i s ¢ - „,: , , ,,,, _. - :-;'4' Figure 4.PS-4 • • 0 S 4 ; ° s . a ...,/4 . °B.41,4 ...04.,.-:, ` " ,µ #'t' 'fit ', , .4 � r <" 9 -..�. . ` = tr 1.--277,r f" ' . ' ,e: .4 p ,,,,t7..,:-:( 1- 4. • T ..$''I }PS ` a ‘, z..tyar t . �,.,' . Figure 5.PS-5 ,',. ', ' . ': , ' ..'',' ,'.. 1 '1,::';'':'":1.,''''','I'l'''',.:::4',;:l. :'4.1!4:1':::111..:.':.''' :::'''I''''''''''.:::::'..:r'17;:."'':'l'i:114t::::11:::::,:' t `kw _ .ky „:"'!,,kl.., *. r. j ' 4r J i .w a ' ' aI ;''. , '.1.: ti Figure 6.MI-1 • ---- • Mfr . II t 72190010 t> :� 3r J i +sir ~ �F5t -"•-•:'r , , -,„-?,":.; ,.-.4 y - -,,' „:„,- _At Agi.....,,,-'- . r >i'y f ar d' - c e 44".e' ' v. 6'. .4"' '3r s .E _ 4 r d r 'l a s" "H / ' ,. c a a } ;n _f T 1i ,,9i+t,, ,, It� opt : ftp`. * ,..,---it.,,f,..,64...,z,., ,'., 4 .. , ,e.,,,l/ 40if ,:, .0_, AL AI ... Meters Legend 0 165 330 660 990 1,320 N Man Made Structures 1 .9 9,38 A WellLoctns 1 centimeter = 94 meters Figure 7.Map of Pilgrim Hot Spring Well Locations • i Appendix D Pilgrim Hot Springs Well Head Repairs • • Pilgrim Hot Springs Geothermal Exploration Project Pilgrim Hot Springs Wellhead Repair Prepared by: Dan Brotherton,Arctic Drilling, Inc.& Markus Mager,ACEP Fairbanks Alaska,September 2010 ACEP ..; F,rslc r for Energy arid Power Alaska Center for Energy and Power University of Alaska PO Box 755910 Fairbanks,AK 99775-5910 1 • • Pilgrim Hot Springs Wellhead Repair Prepared by: Dan Brotherton,Arctic Drilling, Inc. & Markus Mager,ACEP Overview This task was completed in two phases, including: 1)an initial site visit in July 2010 to assess the condition of the six existing wells and develop a work plan for replacing the wellhead assemblies as needed,and 2)a second trip to the site to complete the work outlined in the work plan. This trip took place September 13th-18th. The goal was to stop the wells from leaking, and make them accessible for instrumentation as part of the DOE funded project'Innovative Geothermal Exploration of Pilgrim Hot Springs,Alaska'. This report details the work performed on the individual wellheads during the September trip,which included replacing the gate valves on 4 of the 6 wells, including PS-1, PS-3, PS-4 and MI-1. At this time, none of the wells are leaking to the surface although there are still weak points which need to be addressed in the future. Recommendations for future work are outlined in this report. The team performing the work included Dan Brotherton from Arctic Drilling, Richard Eggert,and Max Iyapana from Bering Straits Development Company(BSDC), and Markus Mager from ACEP. For each of the four wellheads that were repaired,the team removed the existing gate valves by pumping down the water level in order to access the well and installing new, stainless steel valves.A detailed work description for each well can be found on the following pages. The team did not alter the configuration of the wellheads except for installing an additional fitting on top of the blind flanges capping the gate valves that can accept a 3" stainless standpipe with a tee and a valve to allow future installation of monitoring and logging equipment. A 1" access port with a plug was also built into the top of the blind flange. We recommend installing chains and locks on all the new valves and that all valves should be tested for functionality(opened/closed)at least once a year. Winterization of all the wells is necessary in order to prevent freezing and cracking of the gate valves. A plan for winterization has been forwarded in a separate communication that is attached to this report. Mobilization All new valves (6), parts,tools and supplies,totaling 3,842Ibs,were purchased or rented by ACEP and shipped to Nome via Northern Air Cargo (NAC). Additional heavy equipment such as 4 wheelers,trailers, a bobcat and an air compressor were rented in Nome from BSDC. All parts,tools and equipment were transported to the side on September 13th and 14th and staged at the central staging area (Figure 1). Repair work began on the 15th, and was completed on the 18th 2 • • central staging area for repair work hot tub .".. E ,. a �' , .+ate yr ?! , z �"3` � ' -4.4040.-'-- ., - - . -. . - ..- - 'N.1-:- -. •-•/,,f., ----,,,4, 'r ..,,,,, ,, , .......Nez.g.;,iii,,,,b4:. . . t , , „,.. . ... ..a,„,. . , ,1400,4,5„., ,:. .:._ .,. ...,.... • . ...• ,,,.... . .,„..... .. .5,4iK,',. I' x .-*”— ' a�{ §. ,- 'a'1 ` "` 7;-''''{4t sn • %"" 1. e .;T .• '. , :A ' ..,,,„ ,... .„,„, , .., ,. „,..„.,A * Figure 1.Central staging area for repairs. PS-4 (Completed September 14-15th) PS-4 supplies the water for the hot tub from a 2in lower valve. The well was leaking from a%2 inch hole in the blind flange on top of the 10in well gate valve and from the corroded 2in valves on each side of the 10in casing underneath the 10in valve (Figure 2). The lower bolt flange of the 10in valve was covered with mineral buildup and corrosion scale.There was a small pond around the well at the level of the 2in side valves from the constant leaking and overflow from the tub. The team laid down timbers and planks to create a stable work platform and removed mineral build up and rust scale from the lower bolt flange (Figure 3).After various failed attempts to release the old 10in valve from the well flange,the bolts had to be cut off with a torch (Figure 4& 5). 3 • • PS-4 ,lif - , z, e',/- _--- — f t+a 4 5 ii s b` + �1.4 ?i f R i `.. }" t �a t ; ii,, f {�. F Afy 44 .SfPfF f La� }ttM1 fIi Yk4i v 4 a, It i t 4.m"4' , V i f 4)4t i ,1 ,i, 1 'i 1/4;,,;.' i ei,4 it/ I t t. 14 ,,' 4' 4,,, %, , t " 4 6I a A f t , ., ' i,k. itf. f C ,,Ny,. . 4 «i4 ,, , , , 4 t... 1 , v as. 4�j ., j 1 , Figure 2.Arrows show areas of leaking on PS-4. PS-4 Removing mineral buildup and corrosion scale from lower flange I, Vt:' :41 -% ,'% ' t iit ;r 4m i. '' F 91t � i i 4' 1 9 y fib * 44,111 pf A li le F , 9 {! 's),""1 01,1 e !eel i 1 \ i =, , i 446..lk 1110r 11* P 3 Figure 3.Removing buildup and scale and attempting unsuccessfully to cut the flange bolts with a Sawzall. 4 • • PS-4 -- Dan cu ...... M l • s off old valve ya <„ =3 t`-'.1,:17$'45,,'4.7...•'.e-i'.;,,,,-A ;,.!•-.."t tom' ;' ,, tolit.„ 'a / r ^+Iiii►'+'r""� "'ww.�,-,' gym ' :.. F , v Figure 4.Cutting bolts to remove old gate valve. Remo .i z:- valve -....,.,,,,.„...,..-.,„.„-„,„:„,i, 1--_,--i',..,,_,,,''-7-"'''-''' ''''.-''''''' ''''.'- ' i-::,-nkit.;*-,,,,'44._it-,-- ' ' , -.,11,7%'-.77''''''' -4-a.-,-,:r.-..,,?'.4-..'0-,:,;:ele . .140-7-.;," -"'"',4? ' - ft '' •' . ., . , . ,:-4-1,t.:4-:-47.,0' . • t, L ,..., irr. '' • S � e � -,;.t.-# filii .4 li ' . '- w; r' Figure 5.Removing gate valve with Bobcat—note artesian flow from well. 5 • • PS-4 has an inner 8in and an outer 10in casing. The outer casing is corroded and thin.The 8in/10in annulus (space between the two casings)continued to produce water after the water level inside the 8in casing was drawn down. This indicates a likelihood that they are set to different depths and water is produced from a different production zone in the annular space than through the main hole. In order to weld on new 2in nipples, this water would need to be drawn down. We were able to partly draw this water down with a 1in suction tube, but it was ultimately decided to not risk changing the 2in nipples after it was determined they are corroded but still sound (probably just as sound as the casing). Dan was not confident that the casing could be welded given its state of deterioration,so rather than risk creating a difficult to stop leak,the original nipples were left in place and only the 2in valves were replaced with new stainless 2"valves (Figure 6). { PS-4 new valves ,, q . , ,� ,wm New r Ives + but nipples t attach wet a not E �2 y 1, r ar 1. y• irr Corroded old casing and the two nipples are still weaknesses Figure 6.New valves. The flange on this well is partly eaten away but still appears to be sound. The well is artesian and produces clear water. We installed a new 10in stainless steel valve with reducer flange on top connected to a 3in threaded nipple with a stainless cap. The well has no visible leaks and has been re-connected to the hot tub via one of the new 2in valves. Further repairs on this wellhead will be needed in the near future. The 10in casing and the 2in nipples are thin and will eventually start leaking with no way to control or stop the flow. Dan recommends that the 8-10in annulus be cemented from the bottom up to the top via tremie pipe which would seal off the corroded outer casing from the well water and would extend the life of the well. We are also recommending locks on the 2in valves to guarantee flow to the hot tub, prevent accidently closure (or opening)and to prevent well freeze up since this well will presumably not be shut in through the winter. If this is the case, it is imperative that the 2in valve remains open to prevent the new gate valve from freezing. 6 • • PS-3 (Completed September 15-16th) Prior to repairs,this well was leaking through the standpipe at the top of the well and later, after we started to remove buildup and scale (Figure 8),from a hole in the side of the 10in valve(Figure 7). We were unable to plug this leak so we dug a sump hole to drain the fluid and temporarily pump it away from the well and surrounding work space. 3 - t PS- PS-3 ex. '� pie of corroded standpipe cutting of "* ; ellhead .t. i F t r V ' # :Y-} } t, 4,-* A, 4;, t b. . leaks ' . 214'0t' f'tl .ry Figure 7.Image showing leaks and corroded standpipe. 7 • • PS-3 remove scale & mineral buildup from old valve 4414' 1, 4 sly y� drys, i/'.00004 + / , S ^.r sk "'" "M1 t't y Figure 8.Removing scale and buildup. There was significant corrosion to several of the bolts connecting the existing gate valve to the wellhead flange, which necessitated cutting them off with a torch. We were able to drive out some of the bolts once they were cut, but several posed additional challenges and had to be removed in chunks. The torch was damaged during this process. Eventually we were able to remove the old 10in valve and replace it with the new stainless valve and bolts.The lower flange of the wellhead is severely corroded and the new flange bolts are exposed. The flange thickness is about half of original thickness and there is barely enough material left to secure new flange bolts (Figure 9). The well was completed with a new capped gate valve and blind flange, with a 3in nipple and cap. There is a 2in valve below the flange which was left in place as it is not currently leaking. Dan was not confident the well casing is sound enough to permit replacement of this valve. S-3 PS-3 et osed bolts and old 2 inch valve y..ix, =r . h new valve , ..,,, .v.„ a x, exposed bolts `" `•Y.. old flange in bad condition �'. e i a i3 itiold2inchvalve • a o rye not replaced - i 40, j Figure 9.Exposed bolts,new valves. 8 • 0 • PS 3 is hotter than PS-4 and produces clear water. There is also a 6in inner casing in this well that comes to the top of the 10in casing. Once the old valve was replaced,there were no visible leaks. Figure 10 shows a comparison of the old PS-4 valve flange and the old PS-3 valve flange. ?5-3 & PS-4 ,t oldiv R y - • 4' - �v r ,�y.�¢.r...1t.c:1 •M cue t . . g a '#,te «. `°"'` ,,, x^ ^€Ad ,^X' � ...,,.. .„, ...% ..,ik ....zrv,,J... ..,,,Iii,. . .. i. py 44 tr: , ._ ,, , 0,„!.....,., -- .7 ,,,-;_17,...,--_. , -1!,-- _T-s- ---„, -1 Via✓' lr�� c t `, �'; �� �"�i�a�` S�.rfj=s. r� '�":',..p4;-7.,..4 mgay z s (44/4 1,6 .lipr,41‘,,;ttZ-- , ' -1.,-,:?...t,"....—'1 -'' ..,Am —fink.lir Figure 10.Old 10in valves from PS-3 and PS 4. Note severe corrosion on lower PS-3 flange. Further repairs will be needed to this wellhead soon. Dan recommends cementing the 6-10"annulus from the bottom up with tremie pipe so that the side valve can be removed and the main well flange can be replaced. This will protect the well from a permanent leak if one develops from the corroded casing. MI-1 (Completed September 16-18th) This well is located on adjacent Mary's Igloo Native Corporation land.The top of the 10in gate valve was split in half, probably due to a freeze break. We were able to open and close the old gate valve but could not completely stop the flow of the well. MI 1 is colder than PS-4,and the water temperature of this artesian well appears to fluctuate. When flowed for a short period of time it produced gray,silty fluids.The well has no visible inner well casing. Due to leaks in the wellhead, a small pond had formed around the well several inches deep. We cleaned out an existing trench leading away from the well and the pond drained away to ground level. We built a work platform around the well and removed mineral build up, rust and scale from the bolts. Dan cut the bolts and drove them out with the torch. We removed and replaced the 10in valve with new stainless steel valve and bolts (Figure 11). The new gate valve is capped with • a blind flange with Sin welded nipple and cap. 9 • • r, MI-1 MI-1 :. delivering new valve new,valve r Figure 11. Work commences on MI-1. Note artesian flow prior to pumping. Prior to repairs,the well was also leaking from several holes corroded through the casing below the gate valve flange.These leaks continued after installing, capping and shutting the new gate valve. The casing is paper thin midway between the flange and the cement. Dan welded a sleeve around the casing from about 2in above the cement level up to the flange,totaling about 14in. In order to weld on the sleeve, he completely removed the side valve, nipple and weldolet from the 10in.casing.The sleeve stopped the leaks temporarily but the casing below the sleeve is thin and remains a significant weakness (Figure 12). Dan recommends installing a 6in inner casing and cementing the annulus from the bottom to the top via tremie in order to prevent further leaking once the casing corrodes further. m Ml-1 cor f L e • asi :,` repair work on casing installation of new sieev ' l• ',''''",-..S."* ' .,,,.'_!- . u q. It a`' ,, ,4.. Figure 12.Casing conditions of MI-1. 10 0 PS-1 (Completed September 18th) PS 1 is the hottest of the repaired wells. This well was buried past the valve handle and covered with several inches of mineral buildup. Before repairs, it leaked out of a corroded two inch elbow from the top of the wellhead, as well as the remains of a tin valve and a lin hole in the top of the well cap(Figure 13). These holes were plugged with sticks driven into the openings after some of the mineral build up was removed. We thenup excavated around the well to just below the lower valve flange covering an 8ft by 10ft area,dug a sump hole for the water pump and laided downofthe blockingbolts (Figure and timbers14). for a work platform. We removed the mineral build and de-scaled what remain P5-1 = _.. before repair w e a Figure 13.PS-1 after excavation but before repair work. 11 • • • PS-1 Richard and Max remove scale & mineral buildup from old valve . , _ _,, , ,, _ , k A , a t Figure 14.Removing scale and buildup prior to replacing gate valve. When the gate valve was removed, it was evident that the lower flange was almost completed corroded away with no bolt heads remaining and the bolt threads visible from the side of the flange. We used the torch to remove the bolts, removed the old gate valve, cleaned up the flange as much as possible, and installed the new 6in stainless valve topped with a stainless blind flange, 3in nipple and cap(Figure 15). PS-1 h new valve x `., 1 7 `a-- i r ; 7,7 � .,--,--,,--.„,...-7-1,-...-.- fit ' .'S- vation around the-wet collar's. _suctipr Bose .. . ,.,,,f;4tilitti,t7„ .. -, *. ' ,...r. n..1. ..‘,‘,1/40,', - Figure 15.New valve installed on PS-1. Note collapsed suction hose due to high temperatures. This well has a 4in inner casing inside the 6in outer casing,and does not have any lower casing 2in valves. There is not much left of the well flange,just barely enough to bolt on the new valve. The well is sealed and does not 12 0 • leak at this time. We backfilled around the well but not to the previous level so it is possible to access valve handle. We left the remaining dirt piled to the side of the excavated area. Dan recommends installing a short(18in)spool section underneath the new gate valve to raise the valve above ground level and permit the well to be backfilled to ground level. This would also eliminate the standing water around the well,which is now below grade. He also recommends cementing the 4in-6in annulus and welding on a new casing flange in order to prevent future leaks. PS-2 This well is buried but inaccessible with rubber tired backhoe. We did not attempt to dig up this well. The wellhead valve is not corroded or leaking. We will attempt to make it accessible for instrumentation in 2011. r / /,�' iI ; y' yy §y f . 7/ ,t, , s ‘ , , 4 .. 4 "siii,,,A f ,/ ' ' 1 , i 1 . , V::.41,:ifii ' iiit,(...4 A A.,,,, , , /,, , „, , \. k i .,4.6.0,,, , k r / /'4 ,, e,. r fP a' j7 sa- teitt Ni-wiact,. ... , . - ..- mow ;4 ,: \ft ' AV-47',':Al2.' "diW Figure 16.Ps-2 buried but not leaking. We will need to excavate and replace valve before this well can be accessed with instruments. PS-5 This well is also not corroded or leaking so we did not replace the valve at this time. We will attempt to make it accessible for instrumentation in 2011. 13 • • °` .8 -' ',a * ' F. 0.,#!?Vie, k �kaW S 1 t ,t: I' ' yr 4p.„. i "t4 7-...1 f 4. .4 1 y„ f F 1 .:7"-- R. -- .,- # P .4 I" t ,, ,y r t , ` 7-- , Fl a 1t . Figure 17.PS-5 still appears to be in good shape,but not accessible by instrumentation. Winterization Plan for Wellheads (Dick Benoit and Gwen Holdmann) The trick to keeping a wellhead from freezing and then breaking during sub freezing weather is to inject a liquid that is both less dense than water and has a very low freezing point into the wellhead. This fluid needs to be environmentally benign so that when (not if) it is spilled or leaks out of the wellhead it does no environmental damage. Typically a food grade vegetable oil has been used in the lower 48. A small pump is used to pump the oil into the highest opening in the wellhead but if the pressures are very low even a hand operated pump may be enough to do the job. We expect this to be the case for the Pilgrim wells. This pump obviously needs to be able to overcome the internal wellhead pressure and can pump at low rates. You will need to know how much oil has been pumped into the wellhead. Enough oil needs to be pumped into the wellhead to push or displace the water down the well to a point below the freezing level,which is probably not more than a few feet. Therefore, it is necessary to calculate the volume of the wellhead above ground and a few feet of wellbore below ground. We expect this might amount of a few tens of gallons per well. It is important to check the wellhead for leaks, no matter how slow, before injecting the vegetable oil. If the oil leaks out of the wellhead then the water will flow back up in the wellhead and freeze. We recommend doing this on the 4 wells with new gate valves prior to hard freeze-up. 14 • • Colombie, Jody J (DOA) From: Bettis, Patricia K(DOA) Sent: Tuesday, March 03, 2015 2:30 PM To: Colombie, Jody J (DOA) Subject: FW:ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Attachments: AppD_wellhead repairs.pdf For OTH-14-019 From: Alan P. Baldivieso [mailto:ABaldivieso@aidea.orq] Sent: Tuesday, March 03, 2015 1:00 PM To: Bettis, Patricia K(DOA); Schwartz, Guy L (DOA) Subject: RE: ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Thank you, Patricia. I spoke with Chris and he sent the attached report detailing the repairs that the University had done to some of the wellheads. Based on the conversation I had with Guy this morning, the application for sundry approvals will need to include specifics from the contractor that is ultimately selected to perform the work. I have identified several contractors that are familiar with the Pilgrim Hot Springs wells, but will need to accept bids through our procurement process prior to awarding the contract. I anticipate that the earliest the work can begin will be in July, although the road to the site may be clear of snow earlier than usual this year. I will specify that the work be completed by Sept 30, 2015. Is this approach to plugging and abandoning the 6 wells acceptable? Thank you, Alan Baldivieso Program Manager Geothermal, Hydrokinetic, Emerging Energy Technologies Alaska Energy Authority (907) 771-3027 From: Bettis, Patricia K(DOA) [mailto:patricia.bettis@alaska.Rov] Sent:Tuesday, March 03, 2015 11:51 AM To: Schwartz,Guy L(DOA) Cc:Alan P. Baldivieso Subject:ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Guy and Alan, This report may be of use to you. UAF may have worked on some of the wells. Christopher Pike may be able to provide you with that information. His telephone number is(907) 272-1522; cell is (907) 888-3850. Regards, Patricia 1 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 2 S • Colombie, Jody J (DOA) From: Bettis, Patricia K (DOA) Sent: Tuesday, March 03, 2015 2:29 PM To: Colombie, Jody J (DOA) Subject: FW: ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Attachments: 20100629 ACEP Reconnaissance Report Pilgrim Spring Geothermal Wells.pdf Jody, For OTH-14-19 From: Bettis, Patricia K(DOA) Sent: Tuesday, March 03, 2015 11:52 AM To: Schwartz, Guy L (DOA) Cc: Baldivieso, Alan P (AIDEA) (abaldivieso@aidea.org) Subject: FW: ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 This time with the report attached. From: Bettis, Patricia K(DOA) Sent: Tuesday, March 03, 2015 11:51 AM To: Schwartz, Guy L(DOA) Cc: Baldivieso, Alan P (AIDEA) (abaldivieso@aidea.org) Subject: ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Guy and Alan, This report may be of use to you. UAF may have worked on some of the wells. Christopher Pike may be able to provide you with that information. His telephone number is(907) 272-1522; cell is(907) 888-3850. Regards, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 i • Colombie, Jody J (DOA) From: Bettis, Patricia K (DOA) Sent: Tuesday, March 03, 2015 2:29 PM To: Colombie, Jody J (DOA) Subject: FW:ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Attachments: 20100629 ACEP Reconnaissance Report Pilgrim Spring Geothermal Wells.pdf Jody, For OTH-14-19 From: Bettis, Patricia K (DOA) Sent: Tuesday, March 03, 2015 11:52 AM To: Schwartz, Guy L (DOA) Cc: Baldivieso, Alan P (AIDEA) (abaldivieso@aidea.orq) Subject: FW: ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 This time with the report attached. From: Bettis, Patricia K (DOA) Sent: Tuesday, March 03, 2015 11:51 AM To: Schwartz, Guy L (DOA) Cc: Baldivieso, Alan P (AIDEA) (abaldivieso@aidea.org) Subject: ACEP Reconnaissance Trip Report Pilgrim Springs Geothermal Wells Dated 2010 Guy and Alan, This report may be of use to you. UAF may have worked on some of the wells. Christopher Pike may be able to provide you with that information. His telephone number is (907) 272-1522; cell is(907) 888-3850. Regards, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 — — — • ! S •• ACEP Atatik.4 Centel1 rnergydud Pm* 6-29-10 Preliminary Reconnaissance Trip Report Pilgrim Hot Springs Geothermal Exploration Prepared by:Peter 1111g,Alaska Center for Energy and Power,University of Alaska Fairbanks Goals Our preliminary trip to Pilgrim H.S.was intended to locate, map,and determine the status of all 6 wells located at Pilgrim Hot Springs,including those on adjoining MINC land,and to get a general feel for stable ground in the area and potential challenges associated with ground-based surveys planned for later this summer. Notes on Geographic Coordinates. When acquiring GPS points for this project,we determined it would be best to use Universal Transverse Mercator(UTM)as normal distances between lat long lines are distorted due to the high latitude arctic location of the site.UTM provides an easy to use square grid system. For this report I used NAD 1927 Alaska(5003),and the units are in meters.Please make sure that when using coordinates in the area to use this coordinate system. Site Overview Pilgrim Hot Springs is road accessible,although the last mile or so is in bad shape.There is a fair amount of stable ground in the surrounding area,and it seems possible to access all 6 existing wells with equipment needed to replace the wellheads without the aid of helicopter during appropriate times of the year.There are numerous historic buildings, including the church,dominating the north section of the area.To the south is the MI-1(see figure 7),with the Mary's Igloo well being furthest west. Well Descriptions We were able to locate all 6 wells during the trip,and have provided current descriptions of their condition below,with images from the wellheads included in Figures 1-6. Figure 7 shows the relative locations of all the wells. My colleague,Dan Brotherton,is preparing a plan to refit wellheads for all but one or two of these wells so they can be accessed to collect additional data.We have located the original well completion diagrams and other critical information related to the original drilling program in the report'Results of Drilling,Testing,and Resource Confirmation—Geothermal Energy Development at Pilgrim Hot Springs,Alaska'prepared by Woodward-Clyde Consultants in 1983.This report will be very helpful in developing a plan to rework the individual wells as needed. PS-1 (0503536mW 7218438mN) This well is located furthest north (closest to the church and nearest the main trail).It may very well be the hottest of the wells and appears to have significant artesian flow as evidenced through the leakages. The wellhead has a thick layer of silicious deposits on the exterior which has capped some of the leaks. This well will need to be refitted for further use. PS-2 (0503477mW 7218374mN) Located SW from PS-1 is PS-2.This well seems to be in fairly good shape,and is marked by a large white PVC tube.It is located close to the ground,and does not seem to be leaking. It does not appear • necessary to replace this wellhead,although access with appropriate instrumentation may necessitate retrofitting a 2in valve to the wellhead. PS-3 (0503411mW 7218346mN) West of PS-2 is PS-3.It stands out clearly when surveying the area due to its higher wellhead compared to the others.It is also leaking,and will require refitting in order to access the hole.The silicious seal has sealed past cracks in the metal, however there is a constant artesian flow from at least unsealed leak. PS-4 (0503475mW 7218298mN) This is the well which feeds the main hot tub on the property.It leaks considerably,and has a few tubes connected to the wellhead which are presumably used to feed the tub.As with all the wells described thus far,it will require extensive work to be fully operational. PS-5 (0503478mW 7218122mN) PS-5 is the located furthest to the south.Additionally,it is in the best shape of all of the wells.The valves seem to be operational,and there is little rust on the wellhead. Hot water comes out of the valve that we tested which is attached to a garden hose.Getting to the well should not present an issue,however it should be noted there is a lake that was covered with a floating mat of grass that both Dan and I fell into. MI-1 (0503262mW 7218327mN) MI-1 is located furthest west on the field. It was drilled for a hot water source on behalf of Mary's Igloo Native Corporation(MINC).It has extensive damage to the upper part of the well,where a large crack can be seen in the wellhead.The flow is constant from the crack,with much of it being sealed with silica. This wellhead should also be replaced if it is to be accessed in the future for research or development purposes. Conclusions Dan Brotherton will be writing a report suggesting further steps to be taken on the existing wells to make them operational.This report will be shared with the well owners, Unaatuq, LLC and MINC.The next step will be to map culturally sensitive areas(grave sites,historical buildings,etc.)and property boundaries.This task is scheduled for late July or early August. Prior to this trip we will set up a phone conference with all the parties involved to address questions and concerns regarding that trip,to go over schedules,and to develop a backup plan. Figure 7,which is located on the next page,includes all of the well locations and some of the buildings on the property.Once more Information on historic sites,and other important cultural features are identified,they will be added to this map.Any future drilling objectives will take all of this information into account so that any effects are minimized. For additional information or questions about this report please contact: Peter Illig,ACEP illig.ak@Rmail.com 907-602-1332(cell) • • 1110 • ti. yam. mow* J r.. i :.' ,.„.,..,:,..„ ,,, ,,,,,, r. f ''''') , 'i h Figure i.PS-i • NJ ..,-,e- 7:---,.\_ .'� - 1�- , . ' r N'''..::,,. 4\t.' /' '\, 5 . ' : 'C 1' tlf.'' ' '''t'I. ,A' ' i' ;,, , jiott ate. ,,,,'t','./' i "r �r � }1.4 ,, '� ' «gN �ar*p< r., f /,/,- ji,•.,,,:, 4 1 , •,,-•".,.',, ,It..•/,,,',. • •• i/p4 1,O. ,:' ,. _ l rd rt. S rPf. =¢ jet toptsof !Age'4-,. -4 - gite $:;;;4-.0,ittat'l!. • :" i. AO t i;ii 2104( _ `u .,, ' b/ 'i 1..•,!;-.,,,:-.' It :.. .►Y • +:. 1: t 5rro.* - Figure 2.PS-2 go . @ M . • Colombie, Jody J (DOA) From: Bettis, Patricia K(DOA) Sent: Tuesday, February 24, 2015 10:35 AM To: Colombie,Jody J (DOA) Subject: FW: Pilgrim Springs Geothermal Wells Jody, For your records OTH-14-019. Patricia From: Alan P. Baldivieso [mailto:ABaldivieso@aidea.orcl] Sent:Tuesday, February 24, 2015 10:24 AM To: Bettis, Patricia K(DOA) Cc: Schwartz, Guy L(DOA) Subject: RE: Pilgrim Springs Geothermal Wells Thanks, Patricia. Alan Baldivieso Program Manager Geothermal, Hydrokinetic, Emerging Energy Technologies Alaska Energy Authority (907) 771-3027 From: Bettis, Patricia K(DOA) [mailto:patricia.bettis@alaska.gov] Sent:Tuesday, February 24, 2015 10:23 AM To:Alan P. Baldivieso Cc: Schwartz, Guy L(DOA) Subject: Pilgrim Springs Geothermal Wells Alan, I was missing the capital A. From: Bettis, Patricia K(DOA) Sent: Tuesday, February 24, 2015 10:16 AM To: 'abaldivieso@aidea.gov' Cc: Schwartz, Guy L(DOA) Subject: FW: Pilgrim Springs Geothermal Wells Alan, The attached wellbore schematics are what the AOGCC has on files for the listed wells. I am including Guy Schwartz on this e-mail as an introduction. Guy's telephone number is 793-1226. 1 i • r Guy,Alan's telephone number is 771-3027. From the AEA Home Page,Alan is the Geothermal Program Manager. Alan may need help to fill out the sundry applications to plug and abandon the old Pilgrim Springs MI-1, PS-3, PS-4, PS-5, PS-1 and PS-2 wells. Patricia From: Parady, Fred E (CED) Sent: Wednesday, December 03, 2014 9:36 AM To: Fishergoad, Sara L(AIDEA) Cc: Bettis, Patricia K(DOA); Bittner, Jon S (CED) Subject: FW: Pilgrim Springs Geothermal Wells Sara: Attached is a copy of a letter we received regarding DCCED well closure obligations from the Pilgrim Springs Geothermal project from 1979-1982. The operator is listed as DCCED Division of Energy and Power. Did that migrate into AEA, and can you help me run this to ground? We need to come up with an abandonment plan or plan of suspension. We also likely need to apply for an extension. We are working against a 12/15/14 deadline. Thanks for your help. Fred From: Bettis, Patricia K(DOA) Sent: Wednesday, December 03, 2014 9:21 AM To: Parady, Fred E (CED) Cc: Schwartz, Guy L(DOA) Subject: Pilgrim Springs Geothermal Wells Good morning Acting Commissioner Parady, I checked the USPS certified return receipt (green card) and the Alaska Department of Commerce,Community,and Economic Development received the Pilgrim Springs Geothermal Wells letter dated September 12, 2014 on September 15, 2014. I attached the wellbore schematics for those wells operated by the Division of Energy& Power for which the AOGCC has a record. This includes Mary's Igloo-1, PS-3, PS-4 and PS-5. Please note that these are old wellbore schematics contained in a 1983 Woodward-Clyde Consultants report entitled "Geothermal Energy Development at Pilgrim Springs, Alaska, Phase II: Results of Drilling,Testing and Resource Confirmation" and may not reflect the current conditions of the wells. If you have any further questions, please do not hesitate to call or e-mail me. Regards, Patricia 2 • . Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. • 3 • • Colombie, Jody J (DOA) From: Matt Ganley <mganley@beringstraits.com> Sent: Friday, February 20, 2015 1:22 PM To: Bettis, Patricia K(DOA) Cc: Colombie,Jody 1 (DOA) Subject: RE: Pilgrim Springs Geothermal Wells (Docket No: OTH-14-019) Patricia: An Unaatuq Board meeting is scheduled for March 7th and we can have the minutes recertified and signed then. They were approved at the last meeting on October, but were not signed at that time. I will get you a copy of the minutes immediately as well as our documentation and request concerning maintaining the current well status. Thanks. Matt Ganley From: Bettis, Patricia K(DOA) [mailto:patricia.bettis@alaska.gov] Sent:Thursday, February 19, 2015 2:35 PM To:Matt Ganley Cc:Colombie,Jody J (DOA) Subject: FW: Pilgrim Springs Geothermal Wells(Docket No: OTH-14-019) Good afternoon Matt, What is the status of submitting to the AOGCC a signed copy of the September 12, 2014 Unaatuq, LLC Management Board Meeting, signed by a Management Board Member? Please see my January 29th email. Thank you, Patricia From: Bettis, Patricia K(DOA) Sent: Thursday, January 29, 2015 2:10 PM To: matt@iberingstraits.com Cc: Colombie, Jody J (DOA) Subject: Pilgrim Springs Geothermal Wells (Docket No: OTH-14-019) Matt, This email is to summarize our phone conversation on January 28, 2015, regarding the Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1 geothermal wells. If AOGCC approves Unaatuq, LLC's request to be designated operator, Unaatuq, LLC will bear full responsibility for assuring those wells are in compliance with all of AOGCC's statutes, regulations and orders. Unaatuq, LLC is responsible for knowledge of those statutes, regulations and orders. • • Regarding the status of Unaatuq, LLC's request to approve the change in operator, the submitted documentation is incomplete. Specifically Unaatuq, LLC needs to submit a signed copy of the September 12, 2014 Unaatuq, LLC Management Board Meeting, signed by a Management Board Member. Unaatuq, LLC also understands that the wells shall not be left in the current status quo. If Unaatuq, LLC does not demonstrate to AOGCC that the wells should be suspended, and not completed and put into production or abandoned,then the AOGCC will likely order the wells be property plugged and abandoned. See, 20 AAC 25.105 and 20 AAC 25.112. Responsibility for plugging and abandoning the wells, as well as all costs associated with the abandonment procedure, rests with Unaatuq, LLC. Applications for Sundry Approvals to suspend the wells must be submitted to the AOGCC within 15 business days of the date that AOGCC approves the change in operator. A separate application is required for each individual well. A Sundry application form (Form 10-403)for the submittal of a plan of abandonment or a plan of suspension for a well to the AOGCC can be found at: http://doa.alaska.gov/ogc/forms/forms.html. Note, a current well schematic diagram must be submitted with each Application for Sundry Approval and a proposed well schematic diagram shall also be submitted with the sundry application to show proposed downhole well design changes for plug and abandonment plans. All information required by 20 AAC 25.110 must be included or the application will be denied and the AOGCC will at that time will look to Unaatuq, LLC to plug and abandoned the wells to the satisfaction of the AOGCC. If you have questions, please do not hesitate to call me. Best Regards, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 2 • i Bettis, Patricia K (DOA) From: Bettis, Patricia K (DOA) Sent: Thursday,January 29, 2015 2:10 PM To: matt@beringstraits.com Cc: Colombie,Jody J (DOA) Subject: Pilgrim Springs Geothermal Wells (Docket No: OTH-14-019) Matt, This email is to summarize our phone conversation on January 28, 2015, regarding the Pilgrim Springs PS 12-1, PS 12-2, PS 12-3 and PS 13-1 geothermal wells. If AOGCC approves Unaatuq, LLC's request to be designated operator, Unaatuq, LLC will bear full responsibility for assuring those wells are in compliance with all of AOGCC's statutes, regulations and orders. Unaatuq, LLC is responsible for knowledge of those statutes, regulations and orders. Regarding the status of Unaatuq, LLC's request to approve the change in operator, the submitted documentation is incomplete. Specifically Unaatuq, LLC needs to submit a signed copy of the September 12, 2014 Unaatuq, LLC Management Board Meeting, signed by a Management Board Member. Unaatuq, LLC also understands that the wells shall not be left in the current status quo. If Unaatuq, LLC does not demonstrate to AOGCC that the wells should be suspended, and not completed and put into production or abandoned,then the AOGCC will likely order the wells be property plugged and abandoned. See, 20 AAC 25.105 and 20 AAC 25.112. Responsibility for plugging and abandoning the wells, as well as all costs associated with the abandonment procedure, rests with Unaatuq, LLC. Applications for Sundry Approvals to suspend the wells must be submitted to the AOGCC within 15 business days of the date that AOGCC approves the change in operator. A separate application is required for each individual well. A Sundry application form (Form 10-403) for the submittal of a plan of abandonment or a plan of suspension for a well to the AOGCC can be found at: http://doa.alaska.gov/ogc/forms/forms.html. Note, a current well schematic diagram must be submitted with each Application for Sundry Approval and a proposed well schematic diagram shall also be submitted with the sundry application to show proposed downhole well design changes for plug and abandonment plans. All information required by 20 AAC 25.110 must be included or the application will be denied and the AOGCC will at that time will look to Unaatuq, LLC to plug and abandoned the wells to the satisfaction of the AOGCC. If you have questions, please do not hesitate to call me. Best Regards, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907) 793-1238 1 • CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 2 Y • • Bettis, Patricia K (DOA) From: Bettis, Patricia K (DOA) Sent: Monday, December 29, 2014 11:19 AM To: Gwen Holdmann (gholdman@alaska.edu); 'matt@beringstraits.com' Cc: Colombie,Jody J (DOA) Subject: Pilgrim Springs: Designation of Operator Form 10-411 (Rev. 7/2009) and Bonding Requirements Attachments: 20141021 Pilgrim Hot Springs well bonding.pdf Re: Designation of Operator Form 10-411 (Rev. 7/2009) and Bonding Requirements: Pilgrim Springs Geothermal Wells PS 12-1, PS 12-2. PS 12-3, and PS 13-1 Dear Mr. Ganley and Ms. Holdmann: The Designation of Operator Form 10-411 (Rev. 7/2009) submitted to the Alaska Oil and Gas Conservation Commission (AOGCC) on December 12, 2014 via e-mail is incomplete and therefore not accepted. As required by 20 AAC 25.025, Unaatuq, LLC must first establish a new bond with the AOGCC. The AOGCC must receive and approve this bond before any other forms will be processed. The AOGCC will not accept the transfer of the existing bond from the University of Alaska, Fairbanks Alaska Center for Energy & Power's (UAF)to Unaatuq. For the Designation of Operator form, please submit a completed form with original signatures to the AOGCC. Box 4, Effective Date of Designation, must be filled in reflecting the date the designated operator changes. This effective date must not be earlier than the date that Unaatuq, LLC's bond becomes effective. Per the instructions in Box 5 and Box 6, a Power of Attorney or other evidence of authority must be attached for each person signing the form. The applicable UAF lease will be expiring soon relative to the aforementioned geothermal wells. Under 20 AAC 25.105, all permitted wells on a property must be properly abandoned before expiration of the operator's rights. In consideration of the holidays, the AOGCC will grant UAF and Unaatuq, LLC until January 31, 2015 to establish a new bond and to submit all required information to effect the change of operator. After that date, the AOGCC will be looking to UAF to submit an acceptable plan for the plugging and abandonment of the wells. Absent the parties providing AOGCC with the information and bond required to effect a change of operator, forfeiture of the UAF's bond will occur as of February 1, 2015. Please call Ms. Jody Colombie at (907) 793-1221 if you have questions concerning posting of a bond or information required to complete The Designation of Operator Form 10-411 (Rev. 7/2009). Best Regards, Patricia i • • PS I attached AOGCC's instructions concerning well bonding sent to UAF on October 21, 2014 for reference. Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments, contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 2 • From: Colombie,Jody 3(DOA) To: Bettis,Patricia K(DOA) Subject: FW: Pilgrim Hot Springs well bonding Date: Monday,December 29,2014 11:11:14 AM From: Colombie,Jody J (DOA) Sent: Tuesday, October 21, 2014 2:10 PM To: Christopher Pike Subject: RE: Pilgrim Hot Springs well bonding Christopher, please see below. Bond Instructions Each operating company ("operator: see 20 AAC 25.990(46)) establishes a single-well bond or a statewide bond with Alaska Oil and Gas Conservation Commission (AOGCC) under Regulation 2Q AAC 25.025 to drill, produce, and maintain oil and gas wells. An operator's bond remains active from the time the operator applies for a Permit to Drill for its first well until all wells operated by that particular company are plugged and abandoned according to state regulations and all well sites are restored in conformance with Regulations 20 AAC 25.170 or 20 AAC 25.172. The AOGCC does not establish bonds solely for the purpose of dismantling, removing and restoring wells. The AOGCC's website contains a general discussion of bonding requirements and the permit to drill process at the following hyperlink: htto://www.doa.alaska.gov/ogc/functions/OvrSurvindex.html. This link will take you to a web page that is titled"Oversight and Surveillance." This is a long page, but it explains both processes and the imbedded hyperlinks will take you to all of the regulations and forms. Each of the headings on the page are hyperlinks. Clicking on them brings the text and descriptions into view. This web page is provided for your convenience; please be sure to review the Alaska State Statutes and the Alaska Administrative Code, which are the ultimate authorities. Operators can choose to submit either a surety bond (Form 10-402A) or a personal bond(Form 10- 402B), depending on the financial instrument used. AOGCC's bond forms are available online through our website using the "Forms& Functions" hyperlink. Form 10-402A is required to establish a Surety Bond. A Personal Bond is established using Form 10-402B. If a surety bond is used,the insurer must be authorized in Alaska. You can check this online,at: http://www.dced.state.ak.us/ins/apps/companysearch/InsCompanvStart.cfm. Type in the insurance company name, click on the "Submit" button, then click on the hyperlink in the "Company Name" column, click on the "Line of Business" hyperlink, and scan down the "Line Name" e • • list to find "Surety" and then across to find the effective date for that company's license in the State of Alaska. If"Surety" is not in the list,then the company is not authorized to provide that service in Alaska. If an operator chooses to use a Certificate of Deposit (CD) as the financial backing for the bond,then the operator must submit: 1. Personal Bond form (Form 10-402B), 2. CD documentation or receipt, and 3. Assignment of CD form (available on AOGCC's "Forms" page beneath the Personal Bond (10- 402B)form). The CD must clearly state that the certificate of deposit is issued in the sole favor of the Alaska Oil and Gas Conservation Commission,and it must be obtained from a bank authorized to do business in the State of Alaska. If you chose to use an out-of-state bank or credit union,you can check whether or not that institution is authorized by going online to: http://commerce.alaska.govJdnn/dbs/Banking/ModelForeignBankloanAct.aspx. Please note that Powers of Attorney are required for every representative signing these forms. These Powers of Attorney must demonstrate that each person signing has the legal authority to bind the corporation to lease agreements. The bond cannot be processed until the AOGCC has Powers of Attorney for every representative signing these forms. Jody J. Colombie Special Staff Assistant Alaska Oil and Gas Conservation Commission 333 West 771 Avenue Anchorage, Alaska 99501 Jody.Colombie@plaska.gov Office: (907) 793-1221 Fax: (907)2 76-7542 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you,contact Jody Colombie at 907.793.1221 or jody.colombie@alaska.gov From: Christopher Pike [mailto:cpike6(aalaska.edu] Sent: Tuesday, October 21, 2014 11:40 AM To: Colombie,Jody J (DOA) Subject: Pilgrim Hot Springs well bonding • Hello Jody- I work for the Alaska Center for Energy and Power at UAF and I'm working on the Pilgrim Hots Springs project. We are currently completing the geothermal exploration program that we've been leading at the site. Blanket surety bond # 105781660 was issued in July 2012 for the wells drilled as part of this project. I've been in contact with Guy Schwartz and Patricia Bettis and they indicated that I should bring bonding questions to you. The landowners are interested in maintaining the three temperature gradient wells that were drilled in 2012 for aquifer monitoring as well as a larger production well that was drilled in 2013.. All parties realize that the bonding obligations must be met, however UAF cannot maintain their bond after our role in the project ends. Can you explain the necessary steps that must be taken by both UAF and Unaatuq (the landowner). My understanding is that the landowners must take out a bond and have it approved by the AOGCC and at that time, the AOGCC will release UAF from its bonding obligations. Is this understanding correct? What forms must be filled out . Any guidance you could give is appreciated. Thanks, Chris Chris Pike Research Professional Alaska Center for Energy and Power tel: 907-272-1522 c: (907) 888-3850 www.uaLedu/acep S Bettis, Patricia K (DOA) From: Sara Fisher-Goad <SFisherGoad@aidea.org> Sent: Wednesday, December 03, 2014 2:12 PM To: Bettis, Patricia K (DOA) Cc: Parady, Fred E (CED); Bittner,Jon S (CED) Subject: RE: Pilgrim Springs Thank you. Although we have no one on staff who was here during that time, it does appear with some of the documents we uncovered that it was a division in Department of Commerce and not a part of AEA or old APA. Fred— regardless of that issue, we can still help get this issue addressed. Sara From: Bettis, Patricia K(DOA) mailto: atricia.bettis alaska. ov Sent: Wednesday, December 03, 2014 2:01 PM To:Sara Fisher-Goad Cc: Parady, Fred E (CED);Jon Bittner Subject: Pilgrim Springs Sara, The AOGCC records show the Division of Energy& Power as the operator of record for Pilgrim Springs-1, Pilgrim Springs- 2, Pilgrim Springs-3, Pilgrim Springs-4, Pilgrim Springs-5 and Mary's Igloo-1 geothermal wells. Hence,AOGCC's September 12, 2014 Pilgrim Springs Geothermal Wells letter was sent to the Alaska Department of Commerce, Community, and Economic Development. Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 • 0 Bettis, Patricia K (DOA) From: Bettis, Patricia K (DOA) Sent: Wednesday, December 03, 2014 2:01 PM To: Fishergoad, Sara L (AIDEA) Cc: Parady, Fred E (CED); Bittner,Jon S (CED) Subject: Pilgrim Springs Sara, The AOGCC records show the Division of Energy& Power as the operator of record for Pilgrim Springs-1, Pilgrim Springs- 2, Pilgrim Springs-3, Pilgrim Springs-4, Pilgrim Springs-5 and Mary's Igloo-1 geothermal wells. Hence,AOGCC's September 12, 2014 Pilgrim Springs Geothermal Wells letter was sent to the Alaska Department of Commerce, Community, and Economic Development. Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettisftalaska.gov. 1 • Bettis, Patricia K (DOA) From: Sara Fisher-Goad <SFisherGoad@aidea.org> Sent: Wednesday, December 03, 2014 11:41 AM To: Parady, Fred E (CED) Cc: Bettis, Patricia K (DOA); Bittner, Jon S (CED) Subject: RE: Pilgrim Springs Geothermal Wells I have our geothermal project manager looking into this and we have a call into Gwen at UAF. The years associated with the drilling from "Division of Energy and Power" is probably old AEA nea APA (Alaska Power Authority). This is an interesting puzzle and I was not aware of this deadline or requirement prior to your email earlier today. It will take us at least a day to close the loop with UAF and come up with a plan,we are researching our library on old documentation. I agree with you, we need to apply for an extension. Patricia—do you know why this was not sent to AEA directly? Do the original documents from 1979 and 1982 mention Alaska Power Authority(I think the name change to AEA happened in 1990)? Sara PS—congratulations on the Acting Commissioner assignment. Sara Fisher-Goad Executive Director Alaska Energy Authority 907-771-3012 (Office) 907-301-0103 (Cell) From: Parady, Fred E (CED) [mailto:fred.parady@alaska.govj Sent: Wednesday, December 03, 2014 9:36 AM To:Sara Fisher-Goad Cc: Bettis, Patricia K (DOA);Jon Bittner Subject: FW: Pilgrim Springs Geothermal Wells Sara: Attached is a copy of a letter we received regarding DCCED well closure obligations from the Pilgrim Springs Geothermal project from 1979-1982. The operator is listed as DCCED Division of Energy and Power. Did that migrate into AEA, and can you help me run this to ground? We need to come up with an abandonment plan or plan of suspension. We also likely need to apply for an extension. We are working against a 12/15/14 deadline. Thanks for your help. Fred 1 + Q • I From: Bettis, Patricia K (DOA) Sent: Wednesday, December 03, 2014 9:21 AM To: Parady, Fred E (CED) Cc: Schwartz, Guy L (DOA) Subject: Pilgrim Springs Geothermal Wells Good morning Acting Commissioner Parady, I checked the USPS certified return receipt(green card) and the Alaska Department of Commerce,Community,and Economic Development received the Pilgrim Springs Geothermal Wells letter dated September 12, 2014 on September 15, 2014. I attached the wellbore schematics for those wells operated by the Division of Energy& Power for which the AOGCC has a record. This includes Mary's Igloo-1, PS-3, PS-4 and PS-5. Please note that these are old wellbore schematics contained in a 1983 Woodward-Clyde Consultants report entitled "Geothermal Energy Development at Pilgrim Springs, Alaska, Phase II: Results of Drilling,Testing and Resource Confirmation" and may not reflect the current conditions of the wells. If you have any further questions, please do not hesitate to call or e-mail me. Regards, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 2 Bettis, Patricia K (DOA) From: Parady, Fred E (CED) Sent: Wednesday, December 03, 2014 9:36 AM To: Fishergoad, Sara L(AIDEA) Cc: Bettis, Patricia K(DOA); Bittner,Jon S (CED) Subject: FW: Pilgrim Springs Geothermal Wells Attachments: MI-1.pdf; PS-3 Wellbore schematic.pdf; PS-4 Wellbore schematic.pdf; PS-5 Wellbore schematic.pdf; Pilgrim Springs Geothermal Wells.pdf Sara: Attached is a copy of a letter we received regarding DCCED well closure obligations from the Pilgrim Springs Geothermal project from 1979-1982. The operator is listed as DCCED Division of Energy and Power. Did that migrate into AEA, and can you help me run this to ground? We need to come up with an abandonment plan or plan of suspension. We also likely need to apply for an extension. We are working against a 12/15/14 deadline. Thanks for your help. Fred From: Bettis, Patricia K (DOA) Sent: Wednesday, December 03, 2014 9:21 AM To: Parady, Fred E (CED) Cc: Schwartz, Guy L(DOA) Subject: Pilgrim Springs Geothermal Wells Good morning Acting Commissioner Parady, I checked the USPS certified return receipt (green card) and the Alaska Department of Commerce, Community, and Economic Development received the Pilgrim Springs Geothermal Wells letter dated September 12, 2014 on September 15, 2014. I attached the wellbore schematics for those wells operated by the Division of Energy& Power for which the AOGCC has a record. This includes Mary's Igloo-1, PS-3, PS-4 and PS-5. Please note that these are old wellbore schematics contained in a 1983 Woodward-Clyde Consultants report entitled "Geothermal Energy Development at Pilgrim Springs, Alaska, Phase II: Results of Drilling,Testing and Resource Confirmation" and may not reflect the current conditions of the wells. If you have any further questions, please do not hesitate to call or e-mail me. Regards, Patricia 1 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 2 • • Bettis, Patricia K (DOA) From: Bettis, Patricia K (DOA) Sent: Wednesday, December 03, 2014 9:21 AM To: Parady, Fred E (CED) Cc: Schwartz, Guy L(DOA) Subject: Pilgrim Springs Geothermal Wells Attachments: MI-1.pdf; PS-3 Wellbore schematic.pdf; PS-4 Wellbore schematic.pdf; PS-5 Wellbore schematic.pdf Good morning Acting Commissioner Parady, I checked the USPS certified return receipt(green card) and the Alaska Department of Commerce, Community, and Economic Development received the Pilgrim Springs Geothermal Wells letter dated September 12,2014 on September 15, 2014. I attached the wellbore schematics for those wells operated by the Division of Energy& Power for which the AOGCC has a record. This includes Mary's Igloo-1, PS-3, PS-4 and PS-5. Please note that these are old wellbore schematics contained in a 1983 Woodward-Clyde Consultants report entitled "Geothermal Energy Development at Pilgrim Springs, Alaska, Phase II: Results of Drilling,Testing and Resource Confirmation" and may not reflect the current conditions of the wells. If you have any further questions, please do not hesitate to call or e-mail me. Regards, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 • • Ashok K.Roy,Ph.D..CIA,CBA Butrovich Building Vice President for Finance&Administration/CFO910 Yukon Drive.Suite 208 &Associate Professor of Business Administration P.O.Box 755120 Phone:(907)450-8028 ® Fairbanks,AK 99775-5120 1, f aa: (907)450-8023 • akro).@alaska.edu UNIVERSITY of ALASKA Many naditians One Alaska DATE: April 18,2013 TO: Kit Duke,Associate Vice President Facilities&Land Management FROM: Dr.Ashok Roy C.C.: Connie Hooper,Wei Guo,Myron Dosch&Nikki Pittman SUBJECT: Delegation of Authority-Board of Regents Policy 05.11 Real Property Transactions Pursuant to Board of Regents' Polity 05.11 concerning university real property,you are hereby delegated authority to: 1) Approve: a) Disposal Plans; • b) Development Plans that do not require Board of Regents approval; c) Development Projects that are expected to result in disbursements of not more than $500,000 in value;and 2) Execute all documents necessary to complete any and all real property transactions on behalf of the University of Alaska, which do not require subordination of the university's interest in real property, and: a) Have been approved by the Board of Regents,individually,or as part of a Development Plan;or b) Are expected to result in receipts or disbursements of not more than$1,000,000 in value. You are responsible for providing advance notice to me of all real"properly transactions which are expected to result in receipts or disbursements greater than$250,000 in value. No further delegation is permitted without my written approval. This authorization replaces any previous delegation that may have been granted with regard to signatory authority for the execution of real property transactions,other than the acquisition of office and other space leases that are addressed under delegation of procurement authority. This delegation is subject to annual review and approval. i ace; nt this del •• ion in ac : dan',e with its terms: ( 3 •i b uke,AVP Fact sties&Land Management Date • • Kit Duke,AVP FLM UA Facilities and Land Managemei Phone: (907)786-7766 1815 Bragaw Street Suite 101 Fax: (907)786-7733 ` Anchorage,AK 99508-3438 Email: kdukel@alaska.edu Web: www.ualand.com UNIVERSITY of ALASKA Many Traditions One Alaska MEMORANDUM DATE: January 12,2015 TO: Tina Schimschat,Regional Resource Mai •ger -eilities-an4l Land Management FROM: Kit Duke,Associate Vice Pi Isiden 40016,4rolith.v4 ► SUBJECT: Limited Delegation of Authority During my absence from the office on January 13,2015 through January 22,2015 you are hereby delegated the authority to act on my behalf and shall have signatory authority for all matters pertaining to the Statewide Office of Facilities and Land Management including, but not limited to, budget, purchasing, procurement,travel and personnel with the following exceptions: 1. This delegation does not extend to the execution of documents related to the transfer of acquisition of real property interests. 2. This delegation does not extend to procurement authority under AS 36.30. 3. This delegation does not extend to execution of documents related to your own travel or to out-of- state travel for Facilities and Land Management staff. This authorization replaces any previous delegation that may have been granted with regard to signatory authority for matters pertaining to the Statewide Office of Facilities and Land Management as described above. My expectation is that if you have any questions or concerns with regards to any matter pertaining to the Statewide Office of Facilities and Land Management that you will contact me such that we may discuss the issues and resolve your concerns.Please sign below,retain the original and return a copy to me. 1 accept this delegation in accordance with its terms: A "5 �t AIS_"►'rt ���-.z--✓tL,��t�:,�- /7/ 4 r (Tina Schimschat,Regional Resource Manager) Date REGENTS' POLICY PART V—FINANCE AND BUSINESS MANAGEMENT Chapter 05.11—Real Property P05.11.010. Purpose and Scope. A. This chapter establishes guidelines for the prudent management, including trust management, and use of all university real property. B. Except as provided in C. of this section, this policy applies to all real property owned by the university or in which the university has a substantial beneficial interest. C. This policy does not apply to university acquisitions of certain space leasehold interests that are administered in accordance with university regulation relating to procurement or to the development of educational facilities. Any third party use of such facilities is subject to this chapter. (06-08-06) P05.11.020.Definitions. In this chapter,unless the context requires otherwise, A. "development plan" means a brief, general description of the major actions to be taken by or on behalf of the university as part of a development project, to include location, type of development, approximate acreage, and property map, and any amendments to the development plan. B. "development project" means a substantial, purposeful alteration of investment property. "Development project" includes activities occurring on investment property such as subdivision and related construction activities; commercial timber harvest, other than to clear the land or for personal use; materials extraction for commercial purposes; oil and gas leasing, exploration or development; mining leasing, exploration or development; or construction of significant structures, not including repairs, maintenance, expansion, or upgrade which does not materially change the essential character of the structure. "Development project" does not include; the grant of an easement or right-of-way or related construction activities; the development of educational facilities; activities to enhance the value of investment property where such activities are minor or incidental to the development of investment property such as clearing land, investigating soils, incidental filling, drilling water wells, constructing driveways, installing utilities, landscaping, or minor construction; and environmental remediation or other actions specifically required by government agencies. C. "disposal plan" means a brief, general description including location, acreage, property map, minimum price and the terms and conditions of the disposal, if available, of the real property for which a sale, lease, exchange or transfer of interest, excluding easements and rights-of-way, is proposed by the university. 05.11 1 Real Property I • • D. "educational facilities" means campus facilities, buildings, improvements, fixtures and major equipment items situated on educational property. E. "educational property" means all university real property designated for education, research, related support, or administrative PmPoses. F. "investment property" means all university real property not designated as educational property. G. "trust land" means all land and interests in land directly or indirectly acquired in connection with federal grants under the March 4, 1915 and January 29, 1929 Acts of Congress, or otherwise received by or granted to the board for purposes of funding the land-grant endowment established pursuant to the 1929 Act of Congress and AS 14.40.400. For purposes of this definition, "indirectly acquired" land and interests in land include replacement land acquired from the State of Alaska and land exchanged for trust land. The Board of Regents, as a constitutionally created instrumentality of the State of Alaska, has been named by the legislature as trustee and holds such land in trust for the exclusive benefit of the university. H. "university real property" means all land and interests in land of any kind or nature, including all appurtenances, where title is held by either the board or the university, whether acquired through purchase, grant, gift, exchange, or other means. (09-19-14) P05.11.030. Fiduciary Responsibility. A. The board affirms its fiduciary responsibility to prudently manage all university real property for the exclusive benefit of the university, subject to restrictions imposed by law, conveyance documents or gift instruments. B. All trust land shall be managed in accordance with sound trust management principles, consistent with the specific fiduciary duties and legal obligations applicable to such land. The chief finance officer is charged with the responsibility of managing trust land in a manner consistent with the fiduciary duties and legal obligations of the board, and shall be directly accountable to the board for the management of such land. (06-08-06) P05.11.040. Classification of Real Property. The chief finance officer shall designate which university real property parcels will be managed as investment property and which will be managed as educational property. Such designations will not preclude the compatible use of such university real property parcels for both educational and investment purposes. The president will resolve any disputes regarding classification of properties for investment or educational purposes. (06-08-06) 05.11 2 Real Property • • P05.11.041.Plans and Reports for University Real Property. The Office of Land Management shall: A. develop, maintain, and periodically update a general strategic plan for the comprehensive management and development of investment property that includes a statement of the goals and objectives to be accomplished; B. prepare and publish proposed development plans that describe development projects being considered for university real property; C. prepare and publish proposed disposal plans that describe university real property parcels being considered for disposal by sale, lease, exchange or transfer of interest; and D. prepare an annual report for the board that contains a summary of the financial performance of the university's land management operations for the prior fiscal year including a summary of receipts, land sales and acquisitions, and land-grant endowment trust fund balances. The report shall distinguish between receipts from trust land and from all other university real property. (09-19-14) P05.11.042.Development Plan and Disposal Plan Notice Requirements. The Office of Land Management shall provide public notice and seek public comment prior to approval of development plans and disposal plans. Notice shall be provided not less than 30 days before the proposed action. (09-19-14) P05.11.044. Fair Market Value and Other Considerations. In exercising its fiduciary responsibility, the board must administer university real property for the exclusive benefit of the university. In the absence of conflict with the board's fiduciary duties and responsibilities, the administration will consider the following principles in managing and developing university real property: A. Fair Market Value. Disposals of university real property interests shall be at not less than fair market value, and acquisitions of real property or interests shall be at not more than fair market value, unless a direct and substantial benefit to the university can be documented, such as when adjacent university property will become more accessible, marketable, or valuable due to increased availability of utilities or access, or when the transaction offers other tangible benefits to the university. Reasonable fees may be established for routine transactions such as permits and temporary uses of university real property. 05.11 3 Real Property • • B. Economic Feasibility. Development projects shall not be undertaken unless the estimated return exceeds the estimated cost of development in an amount commensurate with the risk involved or the project will position the university to benefit from future opportunities. C. Legally and Environmentally Sound Development. University real property shall be developed consistent with local zoning and platting ordinances and in an environmentally responsible manner, consistent with applicable environmental laws and regulations, including those governing wetlands, water and wastewater, forests,wildlife and habitat, and the coastal zone. D. Jobs for Alaskans. To the extent economically feasible and prudent, development projects will provide an opportunity for the creation of jobs for Alaskans by encouraging development of in-state value-added industries. E. Access Through University Real Property. Subject to receipt of acceptable indemnification or tort immunity, the chief finance officer shall: 1. recognize, or provide alternative access for, RS 2477 rights-of-way and existing state-identified historic trails that cross university real property; and 2. consider the grant of access easements and rights-of-way at fair market value, including any diminution of value, provided such easements and rights-of-way do not interfere with the ability to develop or use such real property or other university real property. F. Reasonable Public Uses of University Real Property. To the extent practicable, the university shall permit reasonable activities of the public on university real property that do not interfere with the university's use or the management of such real property. G. Compatible Research and Educational Uses of Investment Property. Investment property shall be made available to faculty and staff for research and educational purposes provided such use is compatible with development plans and disposal plans and approved by the chief finance officer. Academic units will be responsible for all costs and liabilities associated with such research/educational use. (09-19-14) 05.11 4 Real Property i • P05.11.050. Real Property Acquisitions. A. Campus Land Acquisitions. In order to provide an adequate land base to support current and future campus programs, the chief finance officer shall pursue strategic land acquisitions that meet the goals of the university's educational mission. To facilitate such real property acquisitions, the chief finance officer shall consider relevant campus land acquisition plans, as approved by the board as part of campus master plans. B. Federal and State Land Grants. The board will seek to acquire additional real property through state and federal grants in order to rectify inequities in the land grants to the State of Alaska compared to other states for their universities. When selecting new grant lands,the chief finance officer will attempt to acquire parcels where the selection: 1. is consistent with and enhances the goals of the university's educational mission; 2. is located near communities that have a need for expansion and economic development, provided that such selections do not conflict with selections under the Municipal Entitlements Act; 3. enhances or diversifies the university real property portfolio; or 4. has potential for residential, recreational or commercial development, timber harvesting, materials extraction, oil and gas development or mineral development. C. Other Real Property Acquisitions. The chief finance officer shall consider acquisitions or exchanges of property adjacent to existing university real property, when such property consolidates university real property holdings or enhances the access or development potential of other university real property. When economically feasible, and in the university's best interests, the chief finance officer may acquire or invest in real property that will enhance the university real property portfolio. (09-19-14) P05.11.060. Negotiation, Approval, and Execution of University Real Property Transactions. All university real property transactions and agreements are subject to the following: A. Only individuals authorized under AS 36.30 to execute space leases or in writing by the chief finance officer to negotiate real property transactions may do so on behalf of the university or the board. These real property transactions include, without limitation, any transaction involving lease, sale, cooperative development, right of occupancy, use, permit, license, or contract relating to any real property, or any other real property 05.11 5 Real Property • transaction whether or not similar to the foregoing. All other persons or university officials discussing prospective real property transactions with potential third parties must disclose that they do not have authorization to negotiate or commit the university or the board to any transactions, terms, conditions, or diminution of an interest in real property. B. The board shall approve: 1. strategic plans for the management and development of Investment Property; 2. development plans that consist of: a. subdivisions that will result in the development of 10 or more lots; b. timber sales, unless the president determines the sale will have minimal impact; c. material extractions that are anticipated to result in the sale of 100,000 cubic yards or more of material from a new source; or d. oil and gas leases and mining leases encompassing 5,000 or more acres; 3. development projects that are expected to result in disbursements of$1,000,000 or more in value; 4. real property transactions that have not been approved as part of a development plan and are expected to result in receipts or disbursements of$1,000,000 or more in value; and 5. Real property transactions that require the subordination of an interest in university real property of$1,000,000 or more in value. C. The chief finance officer or the officer's designee shall approve the following: 1. disposal plans; 2. development plans that do not require the approval of the board ; 3. development projects that are expected to result in disbursements of not more than $1,000,000 in value; 4. real property transactions that have been approved by the board as part of a development plan or are expected to result in receipts or disbursements of not more than$1,000,000 in value; 5. Real property transactions that require the subordination of an interest in university real property of not more than $1,000,000 in value; and 05.1 1 6 Real Property • • 6. Project cost increases for development projects previously approved by the board, not to exceed 20 percent of the original project cost estimate. D. The chief finance officer is authorized to execute all properly approved real property transactions and may delegate signatory authority to other university officials, provided that any such delegation shall be in writing. Any further delegation must be approved, in writing,by the chief finance officer. (09-19-14) 05.11 7 Real Property Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable b4direct inspection of the file. i c - I (.,c� Well History ile Identifier Organizing(done) Two-sided ❑ Rescan Needed 7CAN: OVERSIZED: NOTES: or Items: ❑ Map : Grayscale Items: ogs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Maria ` Date: 0../V/11- /s/ n4P Project Proofing BY: Ma Date: -.r /s/ ii I Scanning Preparation 3 x 30e. + ,o . TOTAL PAGES ) / 0 (Count does not include cover sheet) 1/14Y: Maria Date: /s/ Production Scanning 1 Stage 1 Page Count from Scanned File: 1 f I (Count does include cove heet) Page Count Matches Number in Scannin Prep ration: YES j/l4DNO BY: Date: / /9 ` i /s/Stage 1 If NO in stage 1, page(s) discrepancies wer/e ound: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned , BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o I v C7 1 0 co b N 9 O O � a • fn N o oa� d o • c) O . O N .co_ N_ E .-U) N Z C _• d Y E 'O . ch o • • 0 d O O Or M 2] d d N N F-0) U r U p 1 ai u) id Co O O CO L E E y N `- T 0 > E E v) m of E O) v to 0 0d 0 3 ._N (� as co 1 0I 0 0 c Z cw o 0 o E E o =° o CDC 1 Z O o r: Et J 0) 0) CO CO JC) 0 .p � 7 f0 F. cn y w o T U I 1 g _I I N a N I N L o .. p) (h M — _ .� M C co _ > O N N LL LL O OI N o.� g 2 m o '. T COch 0; o • -.E U) � E U y c ih c o a s (0-8 @ a s �� C D O O C N O N.� N N 2 E 12 0 N N N N(? (n a) JO c) U O LL a LL LL a E 0 E W X LL LL it o co d E 11 T cn a w U M U o o p U Co 0 (n 0 0 O 6 , a) co I O I p O (0 O( 2 2 2 01 2 o 1 2 2 2 2 a 1 Eo c.)1 15 Oar 15 w /r U J : d' cc 3 N(n N N N�I o O) o°zs N N N N X O Lf. co V Q • 1' 0 J 0 0 C w a w w w M W co W (V w w w CO 0 a ? ' w C p M M CO M CO M M M M M M M p,r .0 O CL O U Y o o o 0 0 0 0 0 0 0 0 0 Eco Ecsj LU co 73-3N N N N N NN N N N N N Cp 7 (0 CO (O (O (O (O C0 CO CO (O (O (0 N Z IX 1 .0. y N N N N N N CO N N N N co '1ao o C) co co co CO CO CO CO ao co M W C O C 0 W z a = xlo m a m (� co > o V O V10 U OGT, 1N Z co com Q O d M ea N o 0D0 rn CZ m o CU) T- 0 J C. w Z O. u) �� ' >- oxtil C r O 16 1 o o o v v OTx E (9 N1 NN E a ' V D U E cv o 4:1( c--) z° r M rcoa I— ch o w aco 0.cv = co 5 J 2 0 0 I p TD TD N ,- 2 0z l d1 = COI a Es2 co .J CO, 0 U) H x :) m 1v co ri a N Q J C F. ° I— a) n1 O) a } 1 CI Z Y d U o AIN c z1 ' I R; iv CO Co Co m m CO CO CO 1 d ' $ 11 m III m 11111 0 0 co m To co O) o0 Oz C ` < U E 0 0 0 0 0 0 0 0 0 E d p CU E N N N N N N N N N z .c C )a a a M co co M co co M CO M N Q 0 w w G Z N N N N N N N N N u) O 1 < C E E E .` coco a' ..7LL N z U p W N c O �N ` U W z IL C 0 U U U 0 0 U U U p 5 Q N J 0 00 d 0 1 W Q G m �'a o- O o 0 0 0 0 0 0 0 0 0 1 3 a a' O H 3 J O F- J J w w w w w W W W W 0 0 0 0' O O p Z } } } 1 p N r 0_ Cl) 1 O M - L co CO T G a / m 1.1 v a ,c2I N 2 aU U I to j RZ Z 1 r s co cn m co O Ce g co co LE Q a O. o o III Lf i,-, m re 0 E MI W a)cm vi N C-) CO z o 3 aH D c E Z w co Q o o to (q J a c j i m E O. O U U c CC o G O ..-.. O a�, E to Uo o } E N Co Q c E c ° V a d N ch 150 5 U) _@ z N CO c r CONCOC0 a) E a. o E N m - ) A p o c G alI (7 c c o Q J cco F. O @ Q o a o co 4 z EE m —' to z { N_ (h (� coO co y co ) N N ccoo a W .0 > m N - > �o 1 N W E a 0 a) 0 0o H 3 N W c t I N a) V. o ' _ . ZCD F. a. CO . I' W m ISI' > Q.' O a m C) O 0 c H ai Z C co O 41 V Q o CO Q O D 47., C C U Ja m y E a c7 E O , -'o —oo E °- ° E E OQ LL 2 m a 0 i c°) 0 0 0 r ci o �\\I �E s AT c = .__ ;. _ 1 st fes: . 3E3 We:f S€\unlh P ienuE — Go\ h1:NOR SF,..:\ A 'S LI L Pncncrage„HlaLko 99561-3572 September 12, 2014 CERTIFIED MAIL- RETURN RECEIPT REQUESTED 7012 3050 0001 4812 6808 (Unaatuq) 7012 3050 0001 4812 6815 (DCED) 7012 3050 0001 4812 6822 (UAF) Matt Ganley, Resources and External Affairs Unaatuq, LLC c/o Bering Straits Native Corporation P.O. Box 1008 Nome,AK 99762 Ms. Susan K. Bell, Commissioner Alaska Department of Commerce, Community,and Economic Development P.O. Box 110800 Juneau,AK 99811-0800 Gwen Holdmann, Director UAF Alaska Center for Energy&Power P.O. Box 755910 Fairbanks,AK 99775-5910 Re: Pilgrim Springs Geothermal Wells Docket No: OTH-14-019 Dear Mr.Ganley, Ms. Bell and Ms. Holdmann: As operators or landowner of record, you are advised that the ten geothermal wells drilled in the area of Pilgrim Springs, Alaska (see attached list) must either be plugged and abandoned in compliance with 20 AAC 25.105 and 20 AAC 25.112 or suspended under 20 AAC 25.110. Alaska Oil and Gas Conservation AOGCC regulations can be found at the following internet address: http://doa.alaska.gov/ogc/Regulations/Reglndex.html. A Sundry application form (Form 10-403) for the submittal of a plan of abandonment or a plan of suspension for a well to the AOGCC can be found at: http://doa.alaska.gov/ogc/forms/forms.html. Please note that each application for Sundry Approval must include a well schematic diagram showing the well's current condition and a well schematic diagram showing proposed downhole well design changes to comply with applicable regulations for plug and abandonment or suspension. Pilgrim Springs Geothermal Wells September 12,2014 Page 2 of 2 If the AOGCC does not receive an acceptable plan and schedule for all ten wells within ninety (90) days of receipt of this letter, the AOGCC will notice a public hearing to determine whether remedial action is necessary with regard to the wells and which entity will bear responsibility for compliance. The applicable University of Alaska, Fairbanks Alaska Center for Energy& Power's (UAF) lease will be expiring soon relative to the PS# 12-1, PS 12-2, PS 12-3 and PS 13-1 wells. Under 20 AAC 25.105, all permitted wells on a property must be properly abandoned before expiration of the operator's rights. Upon expiration of the lease, if these wells are not plugged and abandoned to the satisfaction of the AOGCC, UAF's bond will be forfeited. Forfeiture of the bond will not relieve UAF of responsibility for plugging and abandoning of the wells under AS 31.05. If Unaatuq, LLC desires to take over operatorship of these four wells, a Designation of Operator Form (Form 10-411) must be submitted to and approved by the AOGCC, as provided under 20 AAC 25.020 in addition to filing the bond required by 20 AAC 25.025. Please call Ms. Patricia Bettis at (907) 793-1238 if you have question concerning this matter. Sincerely, Cathy P Foerster Chair, Commissioner Attachment cc: Kit Duke,Associate Vice President University of Alaska Facilities and Land Management 1815 Bragaw St.,Ste. 101 Anchorage,AK 99508 Larry Hartig,Commissioner Department of Environmental Conservation P.O. Box 111800 Juneau,AK 99811-1800 • C a E u co 4- -a 73 -a -a a I^ c c c c c c a) a) a s C C C C Q c 7 c c c 7 a a a v H t t t - c c a a a a N In V) Ln V) In U) C vs C C In 1.4 V) II— a. W O cr M kr) 0 o 0 0 ,-+ o o C oo M J U .11 �-� N 0�0 O ON O N e-i o I- 0 O I- p W W I- J N N CO 00 00 CO e1 a--I ,--I ,--I Q J 01 Cr) rn rn rn Cr) 0 0 0 0 0 cc s--1 ,--I ,--I a--I i--I e1 N N N N 0 N J LU 2 2 2 2 2 cc cc cc cc cc cc cc cc cc cc 3 Y Y Y Y Y Y Y Y Y Y O a Q O13 e1 ei a-I .-I e-1 c-I 1-1 e� ,-I e1 C ea M M M M M M M M M M CO Ce U tr cC OC cc cc OC cc cc cC a' >- LIJ0 2 J U) U) U) U) U) N In I/1 U) V7 E V) H H •ctH H W O H H H H H H U I l0 M M M M M lD lD 11 lD 4- O M O O O O O M M M M O C vl a a a a ,O Z 3 3 3 3 > CC * * * * * * O O O O o CL a a a N O v v as v v v o?S CZ QS o2S c O ce o 0 0 0 0 o OOA 1 00 00 a) E o a a a a a a E Cl O oWC o2S 02S o2S 02S 02S 025 c c c c O LU w w LU J U. OA OD OD OD 0MO OSA a_ 1- 1- > CU Ct. a)cc a) a a) a a o 0 0 0 0 O LU W W W W W a) 0) L 1.. U a) a a) a I- 4- 4- 4- 4- 4- 4- 4+ 4-+ . 4E' Q 0 0 0 0 0 0 c c c c E c c c C C C 0 0 0 U C a — 0 0 0 0 — co CO co co O O v H H v v of - - Y - U > '> '> '> '> '> c In in to LU 0 0 Q Q 0 0 co CO CO CO LS a a a a c d d d d d d LL LL LL LL CO a a Q Q a 0 0 0 0 0 0 D D D R U a c 0o U) o In LO N cr co N E Z O O O N N N O 0 (N O E i i i i i O O 01 01 Q1 O O O N N N M U I— N N N O O O ,--I a--I r-I ,--I 4- a a-i a-1 e-1a-I a-I %-I N N N N O 4-C, a--I N M Ln a) 1 W , , , In S In InE 2 00 OD OD CD 0A '-ir Q C C C C C O _O IO Z a a Q a Q Q- J V) N h In In d0 Ill E E E E E I^ %-1N M e-1 •c •c •c •c 'LIn N N N M Q' OD OA OA OA OD N N IA N 0 a F. 'a a 'a a a a a * RECEIVED :4( Ac E p NOV 202013 Alaska Center for Energy and Power A®GCC November 18, 2013 Patricia Bettis Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 Dear Ms. Bettis: In accordance with UAF's land use agreement with Unaatuq LLC, we would like to extend the suspension of wells PS-12-1, PS-12-2, and PS-12-3 until December 31, 2014. "The non-exclusive exploration LICENSE described in paragraph 1 above shall remain in full force and effect until December 31,2014" (See attached land use agreement with Unaatuq LLC, page 1, section B) The reason we make this request is due to our delaying of testing PS-13-1 until the 2014 season which was caused by unforeseen delays and insufficient time remaining in our 2013 drilling season. By leaving these wells open, UAF will be able to monitor the Pilgrim Hot Springs aquifer for changes during the PS-13-1 testing phase which we expect to occur next spring or summer. Our P&A procedure will remain unchanged. Best Regards, I l L Gwen Holdmann, Director Alaska Center for Energy and Power Alaska Center for Energy and Power• University of Alaska Fairbanks• 814 Alumni Drive • P.O.Box 755910 • Fairbanks,Alaska 99775-5910 •Tel: (907)474-5402• Fax: (907)474-5475 FIRST AMENDMENT to the EXPLORATION LICENSE Of June 18,2012 by and among UNAATUQ,LIC and The UNVERSITY OF ALASKA WITNESSETH: WHEREAS, UNAATUQ granted to the UNIVERSITY an EXPLORATION LICENSE on June 18, 2012,the purpose of which was to conduct geothermal exploration and assessment under the terms and conditions of said LICENSE;and WHEREAS, UNIVERSITY desires to extend said LICENSE and to amend the terms of the LICENSE to permit certain additional activities,set forth below; NOW THEREFORE, in consideration of the mutual agreements and covenants contained herein and other good and valuable consideration,the receipt and sufficiency of which are hereby acknowledged, UNAATUQ and the UNIVERSITY hereby agree to amend the exploration LICENSE of June 18,2012 in the following manner,and through the parts of the LICENSE as referenced below. A. Section 1 of the LICENSE shall now read as follows: 1.Exploration License: UNAATUQ hereby grants to the UNIVERSITY a non-exclusive exploration LICENSE to enter upon the Lands(more fully described in Exhibit A)for the sole purpose of exploring for subsurface geothermal resources.This License does not grant to the UNIVERSITY any interest in the Lands or any rights to the resources located thereon. The right of the UNIVERSITY to enter upon the Lands and conduct a geothermal exploration program shall include the right to conduct geologic mapping,geophysical mapping,the taking of fluid and rock samples,the drilling of Geoprobe holes to a depth not to exceed 175ft for the purpose of siting and drilling of up to six temperature gradient wells(TGW)to a depth not to exceed 2,500'. In addition,UNIVERSITY may drill one production well,of no greater depth than 1500'and no greater width of 14"when completed. Such right of entry upon the Lands shall be limited to access by helicopter,All Terrain Vehicle (ATV),other four-wheel drive vehicle,drilling equipment,snowmobile and by foot.All trash resulting from the activities contemplated hereunder shall be removed from the Lands and deposited in the City of Nome municipal dump. Drilling fluids and drill cuttings will be disposed as required by DEC. B. Section 3 of the LICENSE shall now read as follows: 3.Term of License: The non-exclusive exploration LICENSE described in paragraph 1 above shall remain in full force and effect until December 31,2014. C. Section 7 of the LICENSE shall now read as follows: 7.Geologic Information: On or before December 31,2013 the UNIVERSITY shall prepare and deliver to UNAATUQ a report relating to the Lands summarizing in detail the operations of the UNIVERSITY during the2013 season.Said reports shall include all geothermal,geological,geochemical, and geophysical sample data compiled or acquired by the UNIVERSITY relating to the Lands. Additionally,the UNIVERSITY shall deliver to UNAATUQ all data related to the Temperature Gradient Wells(TGWs)upon completion of the project and/or decommissioning of the these wells whichever occurs first,as required in Section 9.04 below. All data compiled shall be delivered in a format determined acceptable by UNAATUQ. Any data delivered in a non-proprietary format shall be accompanied with a full description of column and row headings,and the delimeters used in compiling the data. D. Section 8(h)of the LICENSE shall now read as follows: 8.Operations of University: (h) In connection with the UNIVERSITY'S reclamation of the Lands upon expiration of termination of this LICENSE,the UNIVERSITY and UNAATUQ shall identify those wells that were drilled in 2011 and 2012 that shall be permanently capped, plugged and decommissioned,at the UNIVERSITY'S expense and in compliance with all applicable state and federal laws and regulations. UNIVERSITY may also,upon agreement from UNAATUQ and pending availability of funding,plug and decommission the legacy wells know as PS1,PS2,PS3 and PS4. No later than December 31,2013, UNAATUQ and the UNIVERSITY shall identify those wells drilled in 2011 and 2012, if any,that will be maintained for future study purposes or may serve UNAATUQ as production wells. The covenants contained in this Section 8(h)shall survive expiration or termination of this License. E. Section 9:04 of the LICENSE shall now read as follows: 9.04 Temperature Gradient Wells:Abandonment/Decommissioning UNIVERSITY will decommission the identified wells[Section 8(h)) in accordance with the standards consistent with 20 MC 25.112,and 20AAC 25.105. The TGWs will be decommissioned in such a manner that they will be plugged and cemented to a depth that will reduce future risk to the surface waters in the area. Such decommissioning shall occur no later than December 31, 2014. If the UNIVERSITY abandons the wells or fails to properly plug and decommission the TGWs by December 31,2014,all associated and reasonable costs incurred by UNAATUQ for the required decommissioning of the TGWs shall be paid by the UNIVERSITY. ,f THIS AMENDMENTS,as stated above,is made and entered into on this IT/ day of-TA ,2013, constitute,with the LICENSE,the full agreement of UNAATUQ and the UNIVERSITY. _ IN WITNESS WHEREOF,the parties hereto have endorsed and ratified this FIRST AMENDMENT to the EXPLORATION LICENSE of June 18,2012,as of the date first hereinabove set forth. For the purpose of expediting execution of this AMENDMENT it may be signed in separate counterparts. When all parties have so signed,the separate counterparts shall be deemed a single AMENDMENT. Each of the persons signing below represents that he or she has legal authority to execute this AMENDMENT on behalf of his or her respective agency or corporation. Bering Strait Native Corporation(BSNC)for Unaatuq, LLC !! By: Matt L.E6ahley Its: VP Resources and External Affairs Representative for Managing Partner, BSNC UNIVERSIOle 7 _ 3 -2 ,3 Kristi erman,Associate Director Faci ities and Land Management UNIVERISTY OF ALASKA Exhibit A to Exploration License by and between UNAATUQ and University effective ,2012 "Lands" The subsurface estate to the Lands contained in this agreement for the purposes of exploration by the University are owned byUnaatud,LLC. The legal description of the Lands is as follows: U.S. Survey 565 Aggregating approximately 320 acres. Refer to the attached map for representation of Lands contained in this agreement. EX LIC UNIVERSITv P1iS 061812 i it Flitigli 1. 14 4, .„. . e :;,....,.,-.1, ilti , lill , _ • . Pt Ili s 0 1 ��;�v?rs� ��f�i%�' '' vac ,;�►a+ Lt I �' r uSdw.rr.A.J6,t I . ` , t,t • .r4:.i'r j(♦ 1. ;"*.. 'WI'. : 51'''.a...)%:,-,i,e2r.;]...*: .:„. _.,t;'. ......, ji -- ansa.,. N r! ...,..:--*-4.4--i, • ....Nt • L 1f, 111111 gt ill! ici_,„.1 ii ‘4 iltkc 1.'! .' r- - el. 111011 1 1 141 it , • r 1 hi ,, i 1 q •r _I g EX_I.IC_UNIVERSIlY_PHS-061812 10 I i 1 ri' --;z:',"r.r ';'1,f,,t1' ♦ .r i f f - 1r iy'j ,v" ,4 ` is I .. ,x. fi iit-- i• vi.. ( t. / ; 1,,,G,_., ):1\ ! ' { -. . �." 1 ♦ 4 t t ,{4i »MIC SArfate/ .`':- , ~) \> j 1 _.— _-.. =_- $SNC SubFurfac ;I i ' • 1 , !\ , i''. . i ' ' , I BSNC Surface ar... . r t' • ), t .` .' ' F l • Subsurface , , • •Pilgrim Hot , ....... �.._` ......f:,�oo 1 SpMlntj¢ Prop. , MINGsurfacer `. h` '` ..- ' c t• BSNC Subsurface ` } sr '( EX LIC_UNIVERSrTY_PUS_061812 I I • EXPLORATION LICENSE THIS EXPLORATION LICENSE(hereinafter referred to as "License")made and entered into as of this a day of „rit,2012("Effective Date")by and between Unaatuq,LLC("UNAATUQ"), an Alaskan corporation,the address of which is P.O. Box 1008, Nome,Alaska 99762 and the University of Alaska, a corporation created and existing under the Constitution and laws of the State of Alaska,whose address is Facilities and Land Management, 181513ragaw Street, Suite 101,Anchorage,Alaska 99508-3438 ("University"). WITNESSETH: WHEREAS,UNAATUQ owns the property contained within United States Survey 565,a description of which is attached hereto as Exhibit "A"(hereinafter referred to as the "Lands"); and WHEREAS,UNAATUQ desires to grant to the University the non-exclusive license to conduct exploration operations on the Lands, in accordance with the terms and provisions set forth below; NOW THEREFORE, in consideration of the mutual agreements and covenants contained herein and other good and valuable consideration,the receipt and sufficiency of which are hereby acknowledged,UNAATUQ and the University hereby agree and covenant as follows: 1. Exploration License: UNAATUQ hereby grants to the University a non-exclusive exploration License to enter upon the Lands(more fully described in Exhibit A)for the sole purpose of exploring for subsurface geothermal resources. This License does not grant to the University any interest in the Lands or any rights to the resources located thereon. The right of the University to enter upon the Lands and conduct a geothermal exploration program shall include the right to conduct geologic mapping,geophysical mapping,the taking of fluid and rock samples,the drilling of Geoprobe holes to a depth not to exceed 175ft for the purpose of siting and drilling of up to six temperature gradient wells(TGW)to a depth not to exceed 2,500'.Such right of entry upon the Lands shall be limited to access by helicopter, All Terrain Vehicle(ATV),other four-wheel drive vehicle,drilling equipment, snowmobile and by foot.All trash resulting from the activities contemplated hereunder shall be removed from the Lands and deposited in the City of Nome municipal dump. Drilling fluids and drill cuttings will be disposed as required by DEC. 2. Surface and Subsurface Rights: • To the extent UNAATUQ may lawfully do so,included in the rights granted herein is the right of the University to use the surface and subsurface estates of the Lands as reasonably necessary to conduct activities under this License. It is the position of UNAATUQ that it has full legal authority to grant the University all surface and subsurface rights reasonably necessary for the University's full enjoyment of the rights conveyed pursuant to this License. 3.Term of License: The non-exclusive exploration License described in paragraph 1 above shall remain in full force and effect until December 31,2013. 4.Exploration and Development: No additional Exploration or development rights are implied or inferred through the execution of this License nor shall this License be deemed a preliminary document or agreement for future leasing of geothermal or geothermal development rights on the Lands. 5. Use Fee: Upon execution of this Agreement,the University shall pay to UNAATUQ the sum of $1000. 6.Exclusivity: Prior to January 1,2013,UNAATUQ agrees to not convey any mineral exploration or development rights to the Lands to a third party. 7. Geologic Information: On or before December 31, 2012 the University shall prepare and deliver to UNAATUQ a report relating to the Lands summarizing in detail the operations of the University during the 2012 season. Said reports shall include all geothermal,geological,geochemical,and geophysical sample data compiled or acquired by the University relating to the Lands. Additionally,the University shall deliver to UNAATUQ all data related to the Temperature Gradient Wells(TGWs)upon completion of the decommissioning of the these wells as required in Section 9.04 below. All data compiled shall be delivered in a format determined acceptable by UNAATUQ. Any data delivered in a non-proprietary format shall be accompanied with a full description of column and row headings,and the delimeters used in compiling the data. 8. Operations of University: EX L[e_UMVERSIYY_PHS061812 2 (a)University shall conduct its operations in a workmanlike manner in accord with the provisions of this License. University shall comply with all Federal, State and local laws,regulations,and ordinances,and shall obtain all necessary governmental permits, and licenses in timely fashion,and provide copies to UNAATUQ. University shall maintain the land in a reasonably neat and clean condition and take steps to prevent erosion or destruction of land. University shall not commit waste, whether ameliorated or otherwise. (b)University shall take all necessary precautions for the prevention of fires and is responsible for the suppression,and must bear the suppression costs, of all destructive or uncontrolled fires occurring in or outside the licensed area resulting from any of the University's activities. University shall comply with all laws, regulations and ordinances promulgated by all governmental agencies responsible for fire protection. (c)University shall maintain adequate supervision at all times when operations are in progress to insure that the provisions of this License and all applicable federal,state and local laws,regulations and ordinances are adhered to. At all times when operations are in progress,the University,or a person authorized by it, is to assume the responsibilities imposed by this License and shall be present on the Lands. (d)The provisions of this License apply with equal force to an agent,employee,or contractor designated by the University to perform any of the operations relating to this License. University is liable for noncompliance of any such agent,employee or contractor. (e)UNAATUQ makes no representations that they will construct or maintain access to the License area. Access over any route not under the UNAATUQ's control is the responsibility of the University. (0 University shall,to the maximum extent allowable under the law,use its best efforts to hire, in connection with its operations under this License, Shareholders of Mary's Igloo and Bering Straits Native Corporations, in this order of preference,who are qualified. (g)University shall uses it best efforts to avoid damage to streams, lakes or other water areas and lands adjacent to them. Vegetation and materials should not be deposited into any stream or other water area. All improvements abandoned must be treated with measures necessary to prevent erosion in a manner acceptable to UNAATUQ during reclamation of the site. Any damage to land or water resulting from failure to satisfactorily adhere to these requirements must be repaired by University.UNAATUQ will,upon satisfactory completion of reclamation activities, issue a letter to the University stating it is satisfied with the University's reclamation efforts. (h)In connection with the University's reclamation of the Lands upon expiration of termination of this License,the University and UNAATUQ shall identify those wells that Ex,,t is UNWERSITY_PHS_061812 3 were drilled in 2011 and 2012 that shall be permanently capped,plugged and decommissioned,at the University's expense and in compliance with all applicable state and federal laws and regulations. No later than December 31, 2012,UNAATUQ and the University shall identify those wells drilled in 2011 and 2012,if any,that will be maintained for future study purposes or may serve UNAATUQ as production wells. The covenants contained in this Section 8(h)shall survive expiration or termination of this License. 8.01Special Provisions under this License: (a) The University shall be bound by all relevant state and federal laws regarding the use, storage and disposal of hazardous substances. The University shall be expressly responsible and liable for any hazardous substances it brings onto the Lands,and for any environmental contamination that it causes as a result of its activities pursuant to this License. All hazardous substances, including solid and petroleum waste materials,including drill mud and drill cuttings of whatever nature placed on the Lands by or on behalf of the University shall be removed by the University from the Lands and disposed of according to law,at its cost and expense. (b)Any spillage of hazardous substances caused by the University shall be immediately reported to UNAATUQ and the appropriate governmental agencies and the University shall immediately clean the affected land. The term"hazardous substances"means any pollutants,hazardous waste,or hazardous substances as defined in or pursuant to the Resource Conservation Recovery Act(42 U.S.C. Section 6901 et seq.)(RCRA),as now or hereafter amended,the Comprehensive Environmental Response Compensation and Liability Act(42 U.S.C. Section 9601 et seq.)(CERCLA)as now or hereafter amended,or any other federal state or local environmental law,ordinance,rule or regulation, notwithstanding any exceptions in such laws,ordinances,rules or regulations applicable to the mining industry. (c)Protection of Archaeological and Historical Resources. The University shall not cause or permit interference with or removal of any artifacts which might be discovered during the course of the University's activities under this License, which discovery shall be immediately reported to UNAATUQ. Upon discovery,all activities in the vicinity of the discovery shall immediately cease until the site is investigated and mitigation measures are approved by UNAATUQ. (d)All solid and petroleum waste material placed on the Lands by the University shall be removed from UNAATUQ's land and disposed of according to law. 9. Specific Requirements:Temperature Gradient Wells(TGWs) EX LIC_UNIVERSITY P}S 061812 4 The following requirements apply to the placement,drilling,and decommissioning of the temperature gradient wells: 9.01 Temperature Gradient Wells: Placement This license permits the placement of and drilling of two temperature gradient wells on the lands described in Exhibit"A." The wells shall not exceed 2,500 feet in depth. University shall notify UNAATUQ of the exact location for the TGWs prior to initiating drilling. UNAATUQ reserves the right to deny the proposed location or locations if said location(s)poses a risk to the surrounding waters, lands,subsistence or archaeological resources. 9.02 Temperature Gradient Wells: Drilling The drilling,casing and capping of the TGWs shall be done in accordance with industry standards. All drilling mud,cuttings and trimmings shall be contained within the drill pad area. No mud,discharge,cuttings or hazardous materials shall be disposed of in nearby bodies of water. Should the University cause an accidental discharge of mud,cuttings,or hazardous materials,the University will cease all operations and proceed in accordance with Section 8.01(b)of this License. The University shall be responsible for any and all costs associated with the reporting,mitigation,and any expenses incurred as a result of its accidental spills and discharges of drilling mud,cuttings,or hazardous materials it caused and that are related to the work under this License 9.03 Temperature Gradient Wells: Research University shall have the right to enter the Lands to conduct research related to,and associated with, the TGWs during the term of this License. 9.04 Temperature Gradient Wells: Abandonment/Decouunissioning University will decommission the identified wells [Section 8(h)] in accordance with the standards consistent with 20 AAC 25.112,and 20AAC 25.105. The TGWs will be decommissioned in such a manner that they will be plugged and cemented to a depth that will reduce future risk to the surface waters in the area. Such decommissioning shall occur no later than December 31,2013. If the University abandons the wells or fails to properly plug and decommission the TGWs by December 31,2013,all associated and reasonable costs incurred by UNAATUQ for the required decommissioning of the TGWs shall be paid by the University. EX LJC_UNIVERSI Y_PHS 061812 5 10.Restoration and Vacating the Lands. The University shall take,or cause to be taken, such actions as are necessary to vacate the Lands within thirty(30)days after expiration or earlier termination of this License, or such later time as shall reasonably be determined by the parties. The University shall remove its personal property,equipment, structures, improvements and hazardous substances it placed on or in the Lands.The University,at its expense,shall leave the Lands I a clean condition. In the event that the Lands are not properly vacated and cleaned,UNAATUQ, at its option,(i) may cause any or all personal property,equipment,structures or improvements remaining on the Lands to be removed, and the Lands cleaned up,at the University's expense;or(ii)may declare any or all personal property,equipment,structures or improvements remaining on the Lands as UNAATUQ's property, and upon such declaration,all rights,title and interest in and to the foregoing shall belong to UNAATUQ without any further action on the part of any party and without cost to UNAATUQ. 11.Right to Publish: All data acquired from use of state and federal funds will become publically available. The University is free to publish data, information and results from the exploration program defined in the SOPO. UNAATUQ will be provided with copies of all published work. 12.Assignment: This License,and the rights and obligations hereunder, may not be assigned in any way by the University without the prior written consent of UNAATUQ.Any assignment made without such consent shall be null and void. 13.Indemnification and Insurance: University agrees to defend, indemnify and hold UNAATUQ harmless from any and all claims and liabilities arising out of or otherwise resulting from operations of the University conducted on the Lands pursuant to this License,except to the extent such claims or liabilities arise from the negligent acts of UNAATUQ. More specifically: (a)University shall indemnify,defend and hold harmless UNAATUQ and its respective directors, officers,agents and employees,from and against any and all expense (including, without limitation,attorney's fees), liability and claims of whatsoever kind and nature for damage to property(including,without limitation,property of the University and UNAATUQ),or for injury to or death of any person(including,without limitation,the officers,agents,contractors and employees of the University)arising from the University's sole negligent acts or omissions. (b) University shall secure and maintain at its sole expense,during the term hereof, insurance in relation to the business operated by the University,the personal property used EX LIC UNIVERSITY PIIS 061812 6 by the University in connection with the perfonnance of this License,and with respect to the License area the following policies of insurance: (1) Employees Liability Insurance of not less than$100,000 and full insurance under any workers'compensation laws covering all persons employed by and working for the University. (2) Comprehensive General Liability Insurance(Bodily Injury and Property Damage)of not less than$1,000,000 combined single limit per occurrence,such insurance to include explosion hazard,personal injury, premises operation, contractual liability coverage. (3) Business Auto Liability Insurance(Bodily Injury and Property Damage)of not less than$1,000,000 combined single limit per occurrence,on all owned, hired and non-owned vehicles. University shall immediately furnish certificates satisfactory to UNAATUQ as evidence of such insurance. Such insurance shall contain provisions that no cancellation or material changes in any policy shall become effective except upon thirty(30) days prior written notice to UNAATUQ. 14. Title: Except as set forth herein, UNAATUQ makes no representation or warranties of title to the Lands.The grant set forth in Paragraph 1 above is limited in that it is only intended to grant such rights to the extent UNAATUQ has the right to do so. 15.General Provisions: 15.01 Amendment of License: This License may only be amended or modified by a document in writing executed by the parties hereto. 15.02 Entire Agreement: This License embodies the entire agreement and understanding between the parties and supersedes all prior agreements and understandings relating to the subject matter hereof 15.03 Governing Law: This License shall be construed and interpreted in accordance with,and governed and enforced in all respects by,the laws of the State of Alaska. Any dispute between the parties arising out of this License shall be filed in the Superior or District Court for the State of Alaska in Fairbanks,Alaska. 15.04 Notice: Any notices payments or other required communications between the parties shall be in writing,and shall be addressed as follows: EX_LIC UAAVERSITY_PHS_061812 7 To University: Copy To: UA Facilities and Land Management UAF Alaska Center for Energy&Power 1815 Bragaw Street,Suite 101 P.O.Box 755910 Anchorage,AK 99508-3438 Fairbanks,AK 99775-5910 { To UNAATUQ: do Bering Straits Native Corporation, Matt Ganley,Resources and External Affairs P.O.Box 1008 Nome,Alaska 99762 IN WITNESS WHEREOF,the parties hereto have executed this License as of the date first hereinabove set forth. For the purpose of expediting execution of this Agreement it may be signed in separate counterparts. When all parties have so signed,the separate counterparts shall be deemed a single Agreement. Each of the persons signing below represents that he or she has legal authority to execute this Agreement on behalf of his or her respective agency or corporation. Bering traits Nat'vc Corporation(BSNC)for Unaatuq,LLC By: Matt L. Its: VP Resou and External Affairs i SITY tifittd,1 i e,Ass r' ice Prot.cnt acilities and Land Management RISTY OF ALASKA EX LIC UNFVBRSITY-PHS_061812 8 Depth O.M NAT) CALIPER AP-COND RES(16IN) I4 I I I 1ft:200ft 0 API-OR 6 INCH 14 0 bt11HO,TA 1000 8 OHM-M 14 AP-COND001 I I 45000 CPS 120000 t 10 __ _ _ _ 5 r, r' C 1 . - — 5 ,I, i J _ t,i 1• c r_- 1 ;'r 50 ti •-.7 1'i- l s a �� • 4c 11 _ H i:. -''.-S ' If. r 70 - iyiirs ~j .` �f r" C 90T. r" -rr r" _r' s 4 / ,-_,-,- • 4 L 1� s • ., \ 'C.,.._ y -I i I "c- 3 140 c 5 1 aiz_ /,),(2,irn o�la - Iz 6 I I 0 20 fx Lr 60 80 100 120 140 160 180 200 220 S � 240 _ 260 300 320 340 380 400 420 440 460 480 500 - 520 540 560 580 600 �- 620 • 640 660 - 680 700 -� a 720 740 J` 760 �. 780 Q 800 r� 820 y -_ 840 860 880 L_ r 900 0 E E T L ' 'Z _ E ec u ,.v E E fl'H' EE °� 2 2 8 d� gg 5 8 3 m aL EE E $ € a oo & & {99"°633°3633 tg o& A •0'2 v 0 0 5aa 8 c8 c o a S T 15 V �EEEEEEEEEEEE in2: - v'm 08 Se £ o 7'04! - ;; a a„ o" " _oao .._Y......,.". :_.",,.". €sa A ,E o as 2 ` aoo o ,Igg �� a ��� d e gtnntSS bSS nm8 ; Yi, 0048 a t_ _Naa :.D N2 221'11 22222 A222 n von §§.2 211 0E' 5S E oil ECE�, CC E $ ,R 9888 cS.R.R 9' EEEE oa �avvvvvv v.' .,v 750 gel vdd o E$ 6 �#`�0 _•g 22 .E Bm--- YonJyYJ'-" n�3 &Nf '71.1, 21A= g,8r NxN FA BB=Wf!!.c.!� Tim , 8888 i§t =nc'iiciiiiEEci gggfEgg tOlia y302. E P.A E 8,.1204 '.5.1 M. $>>`y�8S ut! ' 8m8EEo,880?��.rnE'�3Ew -8m8 eEEE �88'a E._.E EE�EEEEEoo y� Iii*; -- a,a' vNEa 22_11 02 - -' u q£,RBgEEiit6 ofi ;;;;; 818.0 ' as $$$ $$$$aaa �€ �.€F£ _ o cmgcq YYYYT N ?$S ovoo acua'i 8'3fi$$$£fi£$ �; 1111__; --`-$gAEEEEg88�l�»»NGN88888 8 n"-E'n Y a 0 c c ao n S'q'-u H .'.'S; c9,8 8 8?;I c c _ '�" o '0 3 3 3 3 0 --- 8 8 8$, {{'t 0 0 0 0 0 0 0 0 0 0 0 0 c - _---- - - m m m 3 3 Z, Z.E -- 8 i,E E 3 -3 3 3 3 3 3 4°c"; a a c c a rn E o r m m m_c c c c c c c c c c c c 6372 a Qa -"6waA0 "25 " ____.6;;- <<<<it';62;;;2—F44 6- 22222 ,hgt2 - " "Fl-"" -"A= a,—.2<<"n� n°Eo a rA> x 66666666226. 222222626-€ INI g66666v ,"6»6666-»1m 111110 €E 'aa" ~ �i6Ri H§§i zzz�ar- a EE�6ikApvaRRIg-g �aanazaaazEaa'aaaaaaaaa `tn o.n, m0q .tttaAAaagg*6sn os Sngfi of==nwgg cul : mmm a- B q m� 33gg � �8ra 8'3,,,$33 v 3�53SS3nPmmm »»nibGmGR�iGuuuuG u°�i V1.`.f�Ii,nuGGGGGGGGGHGG u°GGGGin GGGul u7 diff ih tg�uai��i��u°�8»>"S33ifi ifi uSG�iii,`c m�Im m 0466..onnnnN..0000nmmmm-.mmOrnmNnnnnnoPnnn..maomnnnmmm 000�000 $ 00000000$ n�..o��-....n6 Q,Q..QQ00000000$ ��� ���$$$o6$oosasooQ0000�............ vvI44L=$$$$$Qv$$$$nv nw 04222“20422--2“22mnaa�mg11k 'iE412 ,womne,oemTIwoe2,"i1nu222am,w12121 wall''I�:2mnnNoo,mrwimmmn 222...... n N �rv0nmmmmNmmmmrvrv....00amN0rvry mmmmmPPP 04043 043304040404 E HP42�ao�4�441" ��wgw.$44"-1 wwoowwNgww22 V412a $«^"a2O-------"'--32m2e 4USE �gOePPP ^ggiggg PPPP :nmw000000000000 M4W I41; O',"°o01gg04:1qWWWW � WM g �r rnisg^�". M M,T,C,n..a�ggax RHEigmaaaaggagaPaP 7 mn. � = OO��+S,2iE �'+600l0 P§25iElr.W 0804 0 888..000000EoInoO., oOooif0000I�N�°o�0000P1§§§oo§ooEOEREPI�'°mE'..............EEE EcoOemmm 000 ^� � 000o ^'^+^+" ' 0 ••• '---, 00 000 00000000000000000000000000000000000000000000000o000004000000000000 E m m a m ""1;;HgIsNg"" r aAME.Es����Elip rIPHMM^Fa Vi"Hili$§liWAE3«I§mmggilA ainI a �"�' PS.IaoPm,amao.a'n"^a ommmmmmmmmmmm sPMsm� 8TtlAWIHiTmmmagggg�gg,tlhgi MAZIME �aMMaaF.Eaa 0.HPANP,°E8VAPCMg:4^oo000.o � ggg$MEm 6mo666666M6 °o eeO0 % *46 0000 NNnO000m004n8O....0 0000 0O6001000Oo0O000o 00 060 00000onnnnnm o^m'"m..'^'�'m0000000000000000 NO.. o n 600003 6000 O .000000 OOOo 0,404 0 0000 0000000 0$04 n00m " " c0 6 60000 6 0000 e__ _ 0 0 0 O 0•.,mk-.0-.0-..-0 nmnmnnnPoPc.TPcPPPPPgV8nMPAMnrvMrPTP,Tg n----- ----8-PPPPPPPP - fen$QEnA Q$$s5 §QQQoQ2Q5QsQ§§§QaQQQQSoqQm0mN0mmmO econne0oc%r000c000c0$ IPOlgccoc0nrv0Annn0A000000oOOO600006000600000000000ee00060 0 , � -n0PNrt -- nnNHO8080000VOOOOO. 80000000000000000m NNnNNNNPPMmVPPnPPnP2NPnPPPPPPN000C002PPPry022 m2ryOO666000 0666600oOo0006o0000006000000 O. ryoOOnr, ,mn 1 8 _ a 011111-11---t11111 ygQvvvq d Noo p q 8qq y252�Qd `5 asa 8$88885558:888888EE8S8EEEEESSSS S83;588EEEEE,88888888855588858;n58En88554.555,, ,, i�8555EE888882.>>,g,555s5555 55 5,55 3m% ge $a 3-33333a3333 i - <<� AAarq<<gggp<<gg<< <q`AAA<<<<AAAA`AAAAAS`ggiu A<<greFEIFEIEHEEEH z I33aaa88a88888338a131885A8AAAAAAAAAAAA53' H38e2626633326863aBiBaia0aBBBe333838383~NNN33830388oBaa88a0~~003ai 000€;; o 46000621o1ave 101ii ikkgi e g iiig oogooedtggo oaoo gga n n ggolo Eaa000! as o=o=tpiittt=o ��aoaPOPoOaaaano a6 0m0_o6�a 00 00 066 a 6 � �$��aa-,o_oo_0000.a.v_ 8885855555855 82888888888882888 22v522222%2222222 , 8 38 m 8,� EEEEEEEEEEEEEEEEE 2 2, 'n�' -01 0 0 £2286 Wel;el; b y°' °1 U n 01 v a v v v v v v v v v v a v v v v Eq. 5>8 222 ccc 85858 55 5 a.� a. ;> & uxn��va22v+��,�=,env 25233 aa��a�oo SS28 ax����� �vv����vggg�gvv�� C:''.4 5 .:bv= HTR 8`�EEEEE8vvvvE�ifi 822888822 888E02C28tl" �b282 222222222222224i7tl822i1229222228lAl_ttltl8cccc. _ 11- .Vi==='iVgli AA =� s 105%1 _:51 . %%%16.1s_TOu.mm �" uuuuuu;uuuuuxxtiuu g axnvv�M a'o-EBxMEovovvvE_ grir.=. "vvEEEEEEEEEEEEEE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE.000 0 1 ;v#114;4 driBi„;„„„„ ' vH ########V6 ### ##yHnn§Wrg#riggg#O###########44#4444444444844444444 EEEEEEEEEEEEEEEEE 288vcoo3333333,"��N`X`.i222N�,"� �00oQo6oe6oPQoo�0000000QooPoo600PP0000a000PooePoaoa000aosooQ0000eaovvaaaaaaaaaaaaaaaaa tl EEEEEE E E E EE EEE E EEEEEEE w E E E E E E E E E EEEEEE E EEE E E EEE EEE EE E EEEEEEE > CEEEoomPon mEooPEE EEE EEE EE E 0000000 Ewqu'n.�.-;-^^”' rvrrvrvnN ,.!. .-4.4,A, 'v "0404 AAA 0404 N 04040404040404 b ON..,,,, A r'ry "'o$o $oN �S oN ACM , *s� o AA N N $� $n$ v 0 n a n AAAA AAA 2000000000 04000400 00000 0 0 001010 0 CC 00 000000000000004 00 0 N 00 *000000000000**000000000000000400005 S 22 mn422 2,45Tm.m' n 04040404 m n 22 2..92..2 222,,922T. 22 o 22'!..-°"" 1,9,9,9,2,9,2' ........NNNNNNnnnnnnn 0� V g '000000000 3000 0000 0 0 0000 0 0 00 0ggg0g0gg00ggg o0 00 e 000000000000000000NN00NNN0000000000000 _ �oomommmm inn AAAA n 0404304 n n o00000000000r __. .. „,” Nnnnnnnn nnnnnnnnnnnnn ` 6PP 6666 m AAAA m P 6 6 �, mP666666P mmPPmPmmPPPPP 040,,,,,,,, ,,,,,e, 0 **** 0� g00000���������� 00 �o �� ����00�00� ���0000�������ggeggegggeggg 0 o0oom000mul oo00oOoryryryrrryrrryrrry ry. ,o.. .. 043304 n n .. .... ..., .. n.................. ................ _ P 8 700 ����� ���� 0 0000 00000 0000000000,0n00000 000100 t0 0000000000 000000000000000000000v0'00000i S oom 00000 v'v'v'mmmP 21J, k 8 MI ,.0".0' t tt Ntttt00 N 0 *o0 0 00 0000 000000000,,0'00100000,.�tggovtigg0g0cgcoogt o0000000000000eE,.t.t.t.t.t't,.t.e.t.t.�'8 11 S Eo 700 0 00000000 0 0 000 0 00 0000 000000000000000000000000000000000000 000000000000000000000000000E 00'0 $ 040400.... n 2 000 n mm nn.' 0 .......,....000 0000000....04 nn 000000000P0o00000000CCC4F0000mm E ^Ie 00000800 00000000000000 0 00 00000 0000000000000000000000000000030'300'0000 00u0I00000000tt4ttttt00E Nrvn.... rvrvrvnN..nN NN...4N N nn nn.+.... .................. .. 3043....304-.-.04..0404 .. 1"�e 12.6. & r gg �AAA444 AAAAAAL4AA A o 00 AAAoo 000000000Aoo� NAooAAAAAAA &AAA Agog M �eOo00eeel �meee l n �o��000 n a¢0 p�-'0 N0 000 55 00 8555558288995 00 00000 00000000000000000000000000 000'0"040'000 00000000 ` I nnm RR n.. mPmm,891S'A,m4,R44,4 m AA 04048... nnnnnnnn.,..N3 N3mNnnNnmm..nn ti.... . .. oo 2 1 s 040 m ���� X0O . . . _, . . M= a mm 33mm 0 n n .V.3mV,n.OFm ..tiHti ......NNrvrvrvNnNnnmmmmmmmmmmVVVVVaaVVVv�iinmvm' 'v1 R-ERnvP'�bmmmbmbmmnnnnnnnnnnmmmmmmmmmmPPPPPPPPPm00000,�mnmP 0:0404VI00r.1001V _ 2 p VV p y b m p y p m y 5,p Y . mV,Vmm� .......VmIE EFEW NHRERF,mmm.m4M.i4U ill V V V V V V V V lgHaI,R1EmmPIP.IImbmbmbREREnnnnnnnnnnbmm EEREEEN-Pov.VPPPPP mEOm .+.......+.. EEE Eo, 000000 00 0 3! 3. .... 6 RECEIVE®AcEp SEP 20 2013 Alaska Center for Energy and Power AOGCC kM September 17, 2013 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Ms. Bettis: In reference to a request for well name change letter dated August 21, 2013 (attached), UAF would like request that the Alaska Oil and Gas Conservation Commission change the name of the following wells as listed PS-12-2 (API #: 50031200080000, Permit #: 2121080) to PS-12-999 S_12.3 (API #: 50031200090000, Permit #: 2121090) to PS-12-2 PS-12-9 (API #: 50031200100000, Permit#: 2121260) to PS-12-3 Please contact Max Frey at (907) 474-1143 or at mefrey@alaska.edu if any further action on our end is needed. Thank you again for your consideration in this matter. Best : -:ards Gwen Holdmann Director Alaska Center for Energy and Power Alaska Center for Energy and Power•University of Alaska Fairbanks•814 Alumni Drive•P.O. Box 755910 • Fairbanks,Alaska 99775-5910•Tel: (907)474-5402• Fax: (907)474-5475 i ,..,..) ''' r v fr's• AUG 26 2013 a j ,°t-- Alaska Center for Energy and Power .G , August 21, 2013 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Ms. Bettis: The University of Alaska Fairbanks (UAF) would like to make a request to change the names of the three temperature gradient wells drilled at Pilgrim Hot Springs,Alaska in the summer of 2012. Currently they are known to the AOGCC as TG-1, PS-12-3, and PS-12-9. UAF would like to request that these well names be changed accordingly: From To TG-1 PS-12-1 PS-12-3 PS-12-2 PS-12-9 PS-12-3 We appreciate you consideration in regards to this issue and we apologize for any confusion it may have caused. Be - -:.rds, wen Holdmann Director Alaska Center for Energy and Power Alaska Center for Energy and Power•University of Alaska Fairbanks•814 Alumni Drive•P.O.Box 755910 • Fairbanks,Alaska 99775-5910•Tel: (907)474-5402•Fax: (907)474-5475 ,„ , 0 , (---„, 0 ACEP Alaska Center for Energy and Power September 17, 2013 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Ms. Bettis: In reference to a request for well name change letter dated August 21, 2013 (attached), UAF would like request that the Alaska Oil and Gas Conservation Commission change the name of the following wells as listed PS-12-2 (API #: 50031200080000, Permit#: 2121080) to PS-12-999 P -12-3 (API # 31200090000, Permit#: 2121090) to PS-12-2 PS-12-9 (API #: 50031200100000, Permit#: 2121260) to PS-12-) Please contact Max Frey at (907) 474-1143 or at mefrey@alaska.edu if any further action on our end is needed. Thank you again for your consideration in this matter. Bestards)e - 7. -Gwen Holdmann Director Alaska Center for Energy and Power Alaska Center for Energy and Power•University of Alaska Fairbanks•814 Alumni Drive• P.O. Box 755910 • Fairbanks,Alaska 99775-5910•Tel: (907)474-5402•Fax: (907)474-5475 e (--, i RECEIVED :� AUG262013 : Alaska Center for Energy and Power ,AOGCG August 21, 2013 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Ms. Bettis: The University of Alaska Fairbanks(UAF)would like to make a request to change the names of the three temperature gradient wells drilled at Pilgrim Hot Springs,Alaska in the summer of 2012. Currently they are known to the AOGCC as TG-1, PS-12-3, and PS-12-9. UAF would like to request that these well names be changed accordingly: From To TG-1 PS-12-1 PS-12-3 PS-12-2 PS-12-9 PS-12-3 We appreciate you consideration in regards to this issue and we apologize for any confusion it may have caused. Be -.rdsI ._ ( wen Holdmann Director Alaska Center for Energy and Power Alaska Center for Energy and Power•University of Alaska Fairbanks•814 Alumni Drive•P.O.Box 755910 •Fairbanks,Alaska 99775-5910•Tel: (907)474-5402•Fax:(907)474-5475 Bettis, Patricia K (DOA) From: Bettis, Patricia K(DOA) Sent: Wednesday, September 18, 2013 1:54 PM To: 'Max Frey' Cc: Schwartz, Guy L (DOA) Subject: Pilgrim Springs Max, Per your request, Plugging and Abandonment of Wells 20 AAC 25.105(a) states"All wells that have been permitted on a property under 20 AAC 25.005 must be abandoned before expiration of the owner's rights [lease] in that property... If the owner is the landowner, all wells that have been permitted on a property by 20 AAC 25.005 must be abandoned within one year following permanent cessation of the operator's ...activity within the field..." Designation of Operator 20 AAC 25.020, "If an owner of a property wishes to designate a new operator for the property, the owner shall submit to the commission for approval a Designation of Operator(Form 10-411). The commission will not approve the designation of a new operator without the signature of the newly designated operator on the same Designation of Operator form...The newly designate operator shall furnish a bond and, if required, security as provided for in 20 AAC 25.025." Bonding 20 AAC 25.025(b), "A bond and, if required, security must be in the amount...of not less than$200,000 for a blanket bond covering all of the operator's wells in the state." For more information on bonding, you may contact Jody Colombie with the AOGCC at (907) 793-1221. Forms may be found at the following link: http://doa.alaska.gov/ogc/forms/forms.html. Let me know if you have any other questions. Thanks, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 D x:t ‘,..- PO (Th ,e---- AcEp d1 September 17, 2013 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Ms. Bettis: In reference to a request for well name change letter dated August 21, 2013 (attached), UAF would like request that the Alaska Oil and Gas Conservation Commission change the name of the following wells as listed P5-12-2 (API #: 50031200080000, Permit#: 2121080) to P5-12-999 PS-12-3 (API #: 50031200090000, Permit#: 2121090) to PS-12-2 PS-12-9 (API #: 50031200100000, Permit#: 2121260) to PS-12-3 Please contact Max Frey at (907) 474-1143 or at mefrey@alaska.edu if any further action on our end is needed. Thank you again for your consideration in this matter. Best a ards,�. • wen Holdmann Director Alaska Center for Energy and Power Alaska Center for Energy and Power•University of Alaska Fairbanks•814 Alumni Drive•P.O. Box 755910 • Fairbanks,Alaska 99775-5910•Tel: (907)474-5402•Fax: (907)474-5475 Page 1 of 3 Okland, Howard D (DOA) From: Max Frey [mefrey@alaska.edu] Sent: Tuesday, September 17, 2013 1:23 PM To: Okland, Howard D (DOA) Subject: Re: Pilgrim Spring PS-12-9 (OLD) PS-12-3 (NEVA Attachments: PS-12-3 140 combined.las Hi Howard: Sure. You can find the combined measurements for PS-12-3 in LAS attached to this email I unfortunately do not have the software to run LAS files on my computer so please let me know if you have a problem opening it. Would you like me to send this in a paper copy to your address as well? Best Regards, Max Frey On Tue, Sep 17, 2013 at 8:17 AM, Okland, Howard D (DOA) <howard.okland@alaska.gov>wrote: Max, TNX for the explanation and files. Could you send the logging data that you have in LAS format? Howa From: Max Frey [mailto:mefrey@alaska.edu] Sent: Monday, September 16, 2013 5:07 PM To: Okland, Howard D (DOA) Subject: Re: Pilgrim Spring PS-12-9 (OLD) PS-12-3 (NEW) Hi Howard: I was able to track down our student researcher who was on site last year and get an explanation for the lack of records from him. "...The induction, resistivity, and caliper logs were not retrieved for PS-12-3 because the caliper tool, which was ran first, was lost down hole due to collapse of the hole (prior to casing). This tool was lost at 1100 ft depth. The 9/17/2013 Page 2 of 3 drillers attempted to loosen the tool and even tried using all the hydraulic power tue rig had, but the tool was effectively buried. This meant the wireline used to run the other logs could be not used as it was attached to the tool. We had to cut the wireline at the well head and lost the entire 1100 ft. The wireline needed to be re-headed to be used again, but Art Clark was the only one who could do that and he had to leave the day before to check on another project out of state. He eventually came back later in September of 2012 with Markus to relog the cased well for gamma as this is the only log that can be recorded through casing. We did manage to run caliper and resistivity early on in the drilling of PS-12-3, but only to 140 ft depth. We did this to check the hole for stability and fluid composition as we were about to set the next casing. I attached what I was able to find from that run. I also attached the temperature excel sheet Markus created that contains the PS-12-3 temperatures as well as all of the other wells and Geoprobe holes..." You can find the attached documents he is referring to attached to this email. If I sent these two documents to you in paper form that suffice for the missing records? Please let me know your thoughts and I will be happy to comply. Best Regards, Max Frey On Mon, Sep 16, 2013 at 3:14 PM, Okland, Howard D (DOA) <howard.okland@alaska.gov> wrote: Max, I'm currently looking at the data that was submitted for the PS-12-9(Old)/PS-12-3(New) Permit to Drill 212-126. The Completion Report 10-407, block 21 indicates that a Mud Log, Induction, Resistivity, caliper, gamma, &temperature logs run. Only a Mud log and Gamma log were received. If Induction, Resistivity, Caliper, and Temperature logs were run, please send to us paper copies and digital copies of these logs. 9/17/2013 Page 3 of 3 TNX Howard Max Frey Program Assistant Alaska Center for Energy and Power University of Alaska Physical Address: 814 Alumni Drive Mailing Address: PO Box 755910 Fairbanks, AK 99775-5910 Office: (907) 474-1143 Fax: (907) 474-5475 Cell: (907) 354-1023 Max Frey Program Assistant Alaska Center for Energy and Power University of Alaska Physical Address: 814 Alumni Drive Mailing Address: PO Box 755910 Fairbanks, AK 99775-5910 Office: (907) 474-1143 Fax: (907) 474-5475 Cell: (907) 354-1023 9/17/2013 I ^'as:.a Cer car for Fr.3ig‘ 3.)C ,,� C Fc' er f. ' , ' August 21, 2013 Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Ms. Bettis: The University of Alaska Fairbanks (UAF) would like to make a request to change the names of the three temperature gradient wells drilled at Pilgrim Hot Springs, Alaska in the summer of 2012. Currently they are known to the AOGCC as TG-1, PS-12-3, and PS-12-9. UAF would like to request that these well names be changed accordingly: From To TG-1 PS-12-1 PS-12-3 PS-12-2 PS-12-9 P5-12-3 2' 2. — 1 ,c. 0— Z3 1-11a We appreciate you consideration in regards to this issue and we apologize for any confusion it may have caused. 7 Be rds, / 4001/ do„. / wen Holdmann Director Alaska Center for Energy and Power Alaska Center for Energy and Power•University of Alaska Fairbanks•814 Alumni Drive•P.O. Box 755910 • Fairbanks,Alaska 99775-5910•Tel: (907)474-5402• Fax: (907)474-5475 • • �� �%% sA THE STATE Alaska Oil and Gas _ 7 fALAs� ° Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue D� ALAS"' Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1433 Fax: 907.276 7542 August 8, 2013 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7009 2250 0004 3911 3415 Gwen Holdmann Director, ACEP University of Alaska Fairbanks P.O. Box 755280 Fairbanks, AK 99755 Re: Pilgrim Springs Wells, Missing Log Data Dear Ms. Holdmann: In 2012, the University of Alaska Fairbanks ACEP drilled three wells in the Pilgrim Springs area: Pilgrim Spring TG-1/PS-12-1 (Permit to Drill No. 212-077), Pilgrim Springs PS-12-3 (Permit to Drill No. 212-109), and Pilgrim Springs PS-12-9 (Permit to Drill No. 212-126). To date, the Alaska Oil and Gas Conservation Commission (AOGCC) has not received all required information for these wells. AOGCC regulation 20 AAC 25.071, Geologic data and logs, requires the operator to submit a sepia and reproduced copy of a complete mud log or a lithology log. A digital image file may substituted for the sepia. A digital data file of all the logs run, composited and preferably in LAS format, is also required. This same regulation also requires a complete set of washed and dried, legibly identified samples of all drill cuttings be submitted. If conventional core was cut, a representative chip sample from each foot recovered is required as well as a lithologic description, a porosity, permeability and fluid analysis report and, if available, photographs of the core. Within 10 business days, please submit this information to the AOGCC. If you have any questions,please contact me at(907) 793-1238 or at Patricia.Bettis@alaska.gov. Sincerely, , tte; Patricia Bettis Senior Petroleum Geologist Ai‘1::: 11E1P1 Alaska Center for Energy and Power PS 12 9 Permit Number : 212 - 126 Contact Information: Gwen Holdmann: gholdman@alaska.edu Max Frey: mefrey@alaska.edu Pilgrim Hot Springs Field Season, 2012 t . RECEIVED JAN 2 5 2013 STATE OF ALASKA AOGl�^� ALASKA OIL AND GAS CONSERVATION COMMISSION • WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil❑ Gas [J SPLUG❑ Other O Abandoned ❑ Suspended[]. lb.Well Class: 20Anc 25.105 20MC 25170 Development ❑ Exploratory 0 GINJ ❑ WINJ❑ WAG❑ WDSPL❑ No.of Completions: 1 Service ❑ Stratigraphic Test 0 2.Operator Name: 5.Date Comp.,Suer e? l 12.Permit to Drill Number: University of Alaska Fairbanks Aband.: 8 012 1212-126 • 3.Address: 6.Date Spudded: 13.API Number. PO Box 755280,Fairbanks,AK 99775-5280 8/17/2012 50-031-20010-00-00• 4a.Location of Well(Governmental Section): 7.Date TD Reached: 14.Well Name and Number: Surface: 52'FSL,919'FEL,S.36,T4S,R31W 1 110:111\ 8/25/2012 1PS-12-9 • Top of Productive Horizon: same ?W38.KB(ft above MSL): -45ft, 15.Field/Pool(s): 5iit\VI3 GL(ft above MSL): -45ft Total Depth: same 9.Plug Back Depth(MD+TVD): Pilgrim Hot Springs • Oft 4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 18.Property Designation: p Surface: x- 665625' y-4054971' Zone- O 1183ft• Pilgrim Hot Springs ' TPI: x- y- Zone- 11.SSSV Depth(MD+TVD): 17.Land Use Permit: Total Depth: x- y- Zone- N/A , Unaatuq LLC 18.Directional Survey: Yes U No kJ 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) N/A (ft MSL) Oft 21.Logs Obtained(Ust all logs here and submit electronic and printed Information per 20AAC25.071): 22.Re-drihl/Lateral Top Window MD/TVD: ' mud logs;induction,resistivity,caliper;gamma,temperature N/A • 23. CASING,LINER AND CEMENTING RECORD V WT.PER SETTING DEPTH MD SETTING DEPTH ND . AMOUNT CASING FT GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 103/4 21.2ppf sch40 0 5 0 5 121/4 in 5ft 5 f V • 6 5/8 '• 18.97 ppf sch 40 0 144' 0 144 9 7/8 in • 144-ft Oft .. 0 1183 0 1183 5 7/8 in V V _• . 2.19 4.2 ppf BQ 0 1040 0 1040 5 7/8 in• - -bottom contented in place Oft • • ' •V -annular space from 160ft . •V V to surface • 24.Open to production or Injection? Yes ❑ No [] 25. . TUBING RECORD-N/A . . If Yes,list each interval open(MD+TVD of Top and Bottom;Perforation . SIZE , DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): . , • 28. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? Yes[i No U ffrix til,,,- )DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST-N/A Date First Production: Method of Operation(Flowing,gas lift,etc.): Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period Flow Tubing Casing Press: Calculated 011-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 24-Hour Rate Iii. _ 28. CORE DATA Conventional Core(s)Acquired? Yes❑ No Q Sidewall Cores Acquired? Yes❑ No 0 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25 071. RBDMS JAN 2 8 2013 gn Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit original only v 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? __ Yes ' No If yes,list intervals and formations tested, briefly summarizing test results.Attach separate sheets to this form,if needed, Permafrost-Top and submit detailed test Information per 20 AAC 25.071. Permafrost-Base see cuttings descriptions Formation at total depth: 31. List of Attachments: 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. • • Contact:Alaska Center for Energy and Power Email: awen.holdmannbalaska.edu Printed Name:GweIsyldmanrt Title: Director,ACEP,UAF • Signature , Phone: 907-590-4577 Dater 10/17/2012 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1b:Classification of Service wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b:TPI(Top of Producing Interval). Item 8:The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13:The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20:Report true vertical thickness of permafrost In Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23:Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production tom more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). _ Item 27:Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 \� 4. Z M X 1 N n— f 1 u v^J A H Md 1 `V illr1=11:11:::::111: , 0) C CO 3 d 3 CS) E d c) 0 C M Z. — M > L d d a, N 00 w cn >Ts V cg w 0 d V O r d 00 Ja C 02 d V d 0 C lC ,- 0 00 d 7 i V O d y `t d +' � = OM �'' •- i N � ' R v = 0 in -6CDa) Cn N Q. d C its_� V c coO = N Alaska Center for Energy and Power 2012 Pilgrim Hot Springs Well Drilling Logs Drilling Logs for Pilgrim Hot Springs Wells TG-1,PS-12-3, and PS-12-9 Date Activity description Hours worked Art and Jeff arrive in Nome.Pick up two rental vehicles.Inspect snow conditions on Pilgrim access road(still 5-Jun considerable). 12 Working in town on equipment preparation.Load Louie Green's backhoe onto our trailer for transport to PHS to 6-Jun dig snow from access road.Northland barge arrives in Nome. 12 7-Jun Equipment preparation continues.Haul Louie's backhoe and unload at PHS access road intersection. 12 Pick up dump truck at Northland.Start equipment engines in town.Drive to site to check on Louie's progress. 8-Jun Drill crew flies from Denver to Anchorage. 12 Pick up remaining three rental vehicles.Crew arrives in Nome on morning flight.Still working on equipment 9-Jun preparation in Nome.Louie has access road dug to the BLM gravel pit.Begin moving equipment to the pit as it's ready.Get backhoe from Northland. 12 Continue equipment prep in Nome(Geoprobe hydraulics etc).Move backhoe to access road and begin working 10-Jun with Louie to clear snow.Move more equipment to BLM gravel pit. 12 Continue equipment prep in Nome.Begin hauling gravel for access road repair.Locate and mark first ten 11-Jun geoprobe sites. 12 Using rented loader,begin mining rock from MINC site at top of Golden Gate and hauling it for access road 12-Jun improvement.Continue work in Nome and moving equipment to BLM gravel pit.Move supplies from Northland to Icy View. 12 13-Jun Move geoprobe to PHS and drive first well to 80 ft.Continue access road repair work,moving equipment to BLM pit,and painting rig in Nome. 12 14-Jun Geoprobe 3 sites,Continue access road repair work.Move more supplies from Northland to Icy View. 12 15-Jun Pick up pipe at Northland and move it,and additonal equipment,to BLM pit.Continue access road work. Geoprobe 2 sites. 13 Finish getting supplies from Northland.Continue access road work and geoprobing.Install new culvert at 16-Jun churchyard springs crossing. 12 Continue road work.Begin moving equipment from BLM pit to PHS runway parking area.Continue geoprobing 17-Jun using 2-pipe method. 12 18-Jun Continue geoprobe work(plugging and driving with larger points).Move trailers to chuchyard area and begin moving into Nun's Quarters.Continue access road work. 13 19-Jun More geoprobe work and access road work.Move two loads of pipe from Nome to runway staging area. 12 20-Jun Continued geoprobe and access road work.Move two more loads of pipe from Nome to runway staging area. 12 21-Jun Continued geoprobe and access road work.Move loader to BSNC gravel pit on main road to get smaller material.Move pallets of cement and drill mud from Nome to runway staging area. 12 Continue geoprobe and access road work using smaller BSNC material.Move drill rig from Nome to runway 22-Jun staging area.Install mast extension and large-diameter tires for improved site access.Waiting on AOGCC permit- 12 23-Jun Continue geoprobe work.Move loader to BLM pit in anticipation of gaining access to this material on 6/25. Begin rig and pipe pallet construction. 12 BEGIN WORK ON TG-1, PERMIT NO.:212-077 24-Jun Continue geoprobe work.Begin moving equipment into churchyard area in preparation to move to well TG-1. Continue pallet construction etc. 12 25-Jun Geoprobe work and TG-1 preparation continue. 12 26-Jun Geoprobe work and TG-1 preparation continue.Build tripod to use for running geophysical logs in existing wells. 12 27-Jun Continue geoprobe work.Get permission to use BLM"gravel"and begin hauling it for access road improvement. Set up and run gamma log in last year's S-9 well, 12 28-Jun Continue geoprobe,access road work,and preparation for well TG-1. Run gamma log on last year's S-1 well. 12 Continue geoprobe,access road work,and preparation for well TG-1.Disassemble and move last year's rig pallet 29-Jun from S-1 site to churchyard staging area.Dispose of last year's stored cuttings in S-1 dug sump and move tanks to staging area. 12 30-Jun More geoprobe and access road work.Begin stockpiling road material at landing strip staging area for future use.Repair(weld)PHS entry gate. 12 More geoprobe work.Begin preparing site TG-1(PS-12-1).Haul material in dump trailer for Louie Green to fill 1-Jul and repair trail leading to boat launch area in case we need to dispose of cuttings there.Run gamma log in well MI-1. 12 More geoprobe and moving of road material to runway staging area.Decide to set up rig pallet at PS-12-1 to 2-Jul allow for BOP installation w/o the need to move rig(raise rig on pallet to required height).Run 2-in water lines from boat-launch slough to site and fill tanks with water.Move mudpump and shaker trailer onto site. 12 After finding out that we can drill to 500 ft w/o AOGCC permits,drill and drive 10 ft of 10-in surface casing and 3-Jul finalize site to where we're ready to begin conductor casing drilling in morning.Finish geoprobe work and collect gamma log from well PS-5. 12 Drill 10-in hole to 100 ft disposing of liquid waste in sump behind garbage pile.Begin moving road material to 4-Jul build base on which backhoe and work to enlarge sump and dump solids. 12 Alaska Center for Energy and Power 2012 Pilgrim Hot Springs Well Drilling Logs 5-Jul Set and cement 6 5/8-in casing to 100 ft.Clean equipment and bring in new light-weight rotary rods for drilling below casing.Continue working on trash-pile cuttings disposal area. 12 Cut pumping sub from 6-in casing,drill cement out from inside casing,and drill 6-in hole to 290 ft.After tripping 6-Jul out drill steel at end of day,well begins flowing^'100 gpm at surface(clay boot around bit"swabbed"the well). Trip in rods to 120 ft and pump drill mud to stop flow.Trip to 220 ft,mix weighted mud and pump.Trip out pipe. 20 7-Jul Trip to bottom and drill to 470 ft.Pull drill pipe from hole. 20 Trip to bottom and drill to 500 ft.Let rods stand w/o circulation for 2 hrs then run Kuster log inside pipe. 8-Jul Circulate and trip pipe from hole.Run gamma,caliper,induction,and resistivity logs in open hole. 20 Although we don't have AOGCC permit to drill below 500 ft,decide to hold off on cementing casing at this depth 9-Jul in the hopes that the permit-to-drill will be finalized today.Install knife-valve and 2-in kill lines on 6-in casing. Take geoprobe and pull rods from 2 sites that weren't yet pulled.Receive AOGCC permit at end of day. 20 10-Jul Trip rods to bottom and drill to 730 ft.Pull rods from well. 20 11-Jul Trip rods to bottom and drill to 1000 ft.Circulate and pull rods from well. 20 Trip and flush drill rods to bottom.Circulate and pull rod from hole.Run gamma,caliper,induction,and Kuster 12-Jul temperature logs in open hole.Prepare site and equipment to set and cement HW casing to 1000 ft.Run casing to 450 ft. 20 13-Jul Finish running casing to 1000 ft and circulate.Mix and pump geolite cement thru casing to surface.....big mess but get it done.Clean equipment and site as much as possible. 22 14-Jul Trip in drill pipe with 3 7/8-in bit and tag cement at 600 ft.Drill out cement to 990 ft leaving 10 ft in bottom. Flush well and fill with water.Trip pipe,install valve at surface,and clean equipment and site. 20 July 15-July 25 Crew returns to Denver for break.Jeff remains in Nome to take care of BOP-related and other issues(60 total hrs worked). 60 26-Jul Crew flies Denver-Nome.Jeff and Don(arrived 7-25)move BOP to Pilgrim.Assist Josh and Charlie in running Kuster in 12-1 well....only get down to 400 ft. 10 27 Jul Install BOP flange on 12-1 and trip steel to well bottom circulating and flushing fluid.Trip pipe and dig out well head for BOP installation 20 Install BOP and system.Trip steel to 200 ft and circulate per test requirements.Pressure system but it leaks. 28-Jul After Ron makes several calls,he opens/closes the bag in quick succession.Discover that we don't have the recording unit so test will have to wait until tomorrow. 20 Install pressure recorder and Ron Tate attempts to run test @ 3000 lbs pressure.The bag bursts and hyd fluid 29-Jul runs from the BOP head.Ron takes off and we remove the BOP and all plumbing from the well.Set up to run Kuster log in well.Begin clearing site and hauling rock material to runway. 20 BEGIN WORK ON PS-12-3, PERMIT NO.:212-109 30-Jul Remove all equipment from site and install ball valve on well.Begin moving gravel to site 12-2 20 31-Jul Set rig pallet on site and move rig onto pallet.Move rock onto access trail and lay tundra mats over the rock. Move equipment on site.Install 2-in water hose from slough to site and set up and fill water storage tanks. 20 1-Aug Set and cement 10-in surface casing.Drilled 9 7/8-in hole to 125 ft. 20 2-Aug Drill 9 7/8-in hole to 204 ft.Set and cement 6-in casing to 204 ft. 20 Pull 10-in casing and cement in large washout hole that was undercutting around the casing.Install 6-in knife 3-Aug valve and drill cement out of 6-in casing to bottom. 20 4-Aug Drill 5 7/8-in hole to 464 ft.Trip pipe at day's end. 20 5-Aug Drill to 754 ft.Trip pipe. 20 6-Aug Intal)new bit,trip pipe to bottom and drill to 1004 ft.Trip pipe from hole. 20 Trip to bottom and flush well.Set up for logging and log well to bottom.Run HW casing to 270 ft with cement 7-Aug sub and shoe installed. 20 Trip/wash HW casing to bottom.Mix cement and pump thru HW cement shoe.Shut in casing and begin moving 8-Aug BOP into place. 20 9-Aug Install BOP flange and set BOP in place.Set up hyd actuator and run preliminary test.Run and record BOP test for AOGCC. 20 10-Aug Trip 3 7/8-in bit to bottom and drill out aluminum float shoe.Drill to 1024 and conduct formation leak test per AOGCC.Drill to 1078....basement rock at about 1040?Trip bit from hole. 20 Tricone bit is very worn so install 3 7/8-in PDC bit and trip to bottom.Drill to 1223 ft and pull bit back into HW 11-Aug casing. 20 Trip to bottom and drill to 1249 ft...very slow drilling.Circulate well and trip out bit.Get rig set up for wireline 12-Aug coring and trip core rods to 980 ft. 20 Trip core rods to bottom,pump down inner-tube,and core from 1249 ft to 1294 ft thru biotite shist and other 13-Aug metasedimentary basement rock.Fill well with abandonment mud and pull core rods from well. 20 14-Aug Set up for logging and collect geophysical and temperature logs from well.Run capped BQ rods to 1295 ft and fill with water.Begin moving equipment from site. 20 • Alaska Center for Energy and Power 2012 Pilgrim Hot Springs Well Drilling Logs BEGIN WORK ON PS-12-9, PERMIT NO.:212-126 Run tremie pipe in annular area to 160 ft and cement top of hole.Remove BOP and flanges.Begin building trail 15-Aug and running water line to site 12-3.Move rig pallet to site. 20 16-Aug Use BSNC skid-steer to begin moving equipment onto 12-3 site.Very soft and muddy.Lay turf mats in worst spots. 20 17-Aug Finish moving equipment and setting up site.Drill and set 5 ft of 10-in surface casing. 20 18-Aug Drill 9 7/8-in hole to 144 ft.Trip out pipe and run geophysical logs. 20 19-Au Begin running 6-in casing but it stops at 30 ft.Pull casing and ream well to bottom.Trip out and run 6-in casing g to 144 ft.Trip tremie to annular bottom and mix and pump cement. 20 20-Aug Well flange to casing,install knife valve,and install diverter system.Trip 5 5/8-in tricone to bottom and drill to 263 ft.Trip pipe from well. 20 21-Aug Install chisel-tooth tricone bit and drill to 423 ft.Very hard drilling in spots.Trip pipe from well. 20 22-Aug Trip pipe to bottom and drill to 723 ft.Pull pipe. 20 23-Aug Trip pipe to bottom w/o problem and drill to 983 ft.Still drilling numerous hard zones. 20 Trip pipe to bottom and monitor mud temp when ciculation starts(145 F max).Drill to 1133 thru varying hard 24-Aug and soft layers.Drills/looks like basement rock at 1083 ft.Trip pipe from well. 20 Trip pipe in hole but have to circulate every 40 ft from 700 ft to 1033 ft then ream to bottom.Drill to 25-Aug 1183 very slow drilling through basement rock,Trip pipe from well. 20 Run steel to 860 ft and ream to bottom.Thin mud and trip rods from well.Begin geophysical logging but caliperj)�:2— i 26-Aug tool becomes stuck at 1065 ft.Trip drill steel into hole to try and wash out logging tool but can't get it washed down to that depth.Pull pipe. 20 Run BQ rods with reaming shoe on bottom to 993 ft.Mix and circulate fresh mud from that point but discover E-- rods are stuck when done circulating....still have perfect circ.Decide to leave rods at this depth rather than 27-Aug trying further to retrieve so that we can at least get temp logs to this depth.Further retrieval efforts will likely result in fractured rods and total loss of the well. 20 28 Aug Cut logging cable.Circulate fluid thru rods.Mix and pump cement thru rods followed by rubber cement plug and 130 gallons fresh water.Begin moving equipment to town. f------- 20 P 29 Aug Pum Well begins flowing 150-200 gpm hot water from annular area.Run tremie into annular and kill flow with heavy ---. mud.Run tremie to 126 ft,mix and cement in annular. 20 \-----1— -- --15RRTLLtNG-ACTIVI�1 SUSPENDED--__ ----- Begin moving equipment from site to runway with skid-steer.Weather conditions are horrible and everything is 30-Aug a total quagmire.Begin moving items to Nome at day's end. 20 Cleaning,packing,moving equipment from site to runway and from runway to Nome.With exception of what 31-Aug will be left in Nome for final P&A of wells next year(PU truck,white trailer,ATV,and ATV trailer)all items are moved to Northland to catch early Oct barge south. 20 1-Sep Continue cleaning,packing and moving.Return skid-steer and ATVs to BSNC. 20 2-Sep Continue cleaning,packing,and moving equipment to Nome. 20 3-Sep Continue cleaning,packing,and moving equipment to Nome. 20 Make final Pilgrim-Nome run with equipment.Finish loading conex box for ACEP,make trash run,turn in rental 4-Sep vehicles,and leave truck,trailer,and ATV at BSNC Icy View yard. 20 5-Sep Crews fly from Nome to Denver.END OF PROJECT. Sep 16-Sep 21 Art and helper return to Nome to rehead logging cable,move equipment to Pilgrim,and collect gamma and equilibrated temperature logs from the 12-3 well. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION - WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil❑ Gas ❑ SPLUG ❑ Other 2 Abandoned ❑ Suspended lb.Well Class: 20AAC 25 105 20AAC 25 110 Development ❑ Exploratory 2 GINJ ❑ WINJ❑ WAG❑ WDSPL❑ No.of Completions: Service ❑ Stratigraphic Test❑ 2.Operator Name: 5.Date Comp.,Susp.,or 12.Permit to Drill Number: University of Alaska Fairbanks Aband.: 8/30/2012 1212-126 3.Address: 6.Date Spudded: 13.API Number: PO Box 755280,Fairbanks,AK 99775-5280 8/17/2012 50-031-20010-00-00 4a.Location of Well(Governmental Section): 7.Date TD Reached: 14.Well Name and Number: Surface: 52'FSL,919'FEL,S.36,T4S,R31W 8/25/2012 1PS-12-9 Top of Productive Horizon: same 8.KB(ft above MSL): -45ft 15.Field/Pool(s): GL(ft above MSL): -45ft Total Depth: same 9.Plug Back Depth(MD+TVD): Pilgrim Hot Springs Oft 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16.Property Designation: Surface. x- 665625' y-4054971' Zone- 1183ft Pilgrim Hot Springs TPI: x- y- Zone- 11.SSSV Depth(MD+TVD): 17.Land Use Permit: Total Depth: x- y- Zone- N/A Unaatuq LLC 18.Directional Survey: Yes U No U 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) N/A (ft MSL) Oft 21.Logs Obtained(List all logs here and submit electronic and printed information per 20AAC25.071): 22.Re-dnll/Lateral Top Window MD/TVD: mud logs;induction,resistivity,caliper;gamma,temperature , N/A , 23. CASING,LINER AND CEMENTING RECORD WT.PER SETTING DEPTH MD SETTING DEPTH TVD_ AMOUNT CASING FT. GRADE TOP BOTTOM TOP BOTTOM HOLE'SIZE CEMENTING RECORD PULLED 103/4 21.2 ppf sch40 0 5 0 5 121/4 in 5ft 5ft i 6 5/8 18.97 ppf sch 40 0 144 - 0 144 '9 7/8 in 144-ft Oft . 0 1183 0 1183 5 7/8 in 2.19 4.2 ppf BQ 0 1040 0 1040 5 7/8 in - -bottom cemented in place Oft • -annular space from 160ft to surface - - 24.Open to production or injection? Yes ❑ No ❑ 25. TUBING RECORD-N/A If Yes,list each interval open(MD+TVD of Top and Bottom;Perforation . SIZE ; DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? Yes U No H ,:? DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED i..0 RECEIVED N O V 0 12012 27 / PRODUCTION TEST-N/A ���� Date First Production: /' Method of Operation(Flowing,gas lift,etc.): Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period - Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 24-Hour Rate - 28. ._ CORE-DATA Conventional Core(s)Acquired? Yes❑ No El Sidewall Cores Acquired? Yes❑ No 2 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed) Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25 071.• RRDMS Nov 0 8 Z01Z Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit original only 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ' No If yes,list intervals and formations tested, briefly summarizing test results.Attach separate sheets to this form,if needed, Permafrost-Top and submit detailed test information per 20 AAC 25.071. Permafrost-Base see cuttings descriptions Formation at total depth: 31. List of Attachments: 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact:Alaska Center for Energy and Power Email: Qwen.holdmannta'�.alaska.edu Printed Name: Gwen Holdmann Title: Director,ACEP,UAF Signature -T Phone: 907-590-4577 Date: 10/17/2012 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 b: Classification of Service wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b:TPI(Top of Producing Interval). Item 8:The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13:The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23.Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production tom more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 5-Jun Arrive in Nome. Inspect site access road. 6-Jun Working in Nome preparing equipment. Work on access road. 7-Jun Preparing equipment. Working on access road. 8-Jun Preparing equipment. Working on access road. 9-Jun Prepairng and moving equipment. Working on access road. 10-Jun Prepairng and moving equipment. Working on access road. 11-Jun Prepairng and moving equipment. Working on access road. 12-Jun Moving equipment. Working on access road. 13-Jun Moving equipment.Working on access road. Begin geoprobe work. 14-Jun Moving equipment.Working on access road. Continue geoprobe work. 15-Jun Moving equipment.Working on access road. Continue geoprobe work. 16-Jun Moving equipment.Working on access road. Continue geoprobe work. 17-Jun Moving equipment. Working on access road. Continue geoprobe work. 18-Jun Moving equipment. Working on access road. Continue geoprobe work. 19-Jun Moving equipment. Working on access road. Continue geoprobe work. 20-Jun Moving equipment. Working on access road. Continue geoprobe work. 21-Jun Moving equipment.Working on access road. Continue geoprobe work. Moving equipment. Working on access road. Continue geoprobe work. Waiting on P5-12-1 (PWN) 22-Jun AOGCC permit-to-drill 23-Jun Continue access road and geoprobe activities. Begin building rig and drill pipe pallets. 24-Jun Continue access road, geoprobe, and equipment prep activities. 25-Jun Geoprobe activities and equipment prep continue. 26-Jun Geoprobe activities and equipment prep continue. 27-Jun Geoprobe work, access road and equipment prep continue. Run gamma log in existing well S-9. 28-Jun Geoprobe work and PS-12-1 (PWN) preparation continue. Run gamma log in existing well S-1. 29-Jun Geoprobe, access road, and equipment prep continue. 30-Jun Geoprobe, access road, and equipment prep continue. Stockpile trail improvement material. Fix entry gate. Geoprobe work continues. Finally have actual site location and begin PS-12-1 (PWN) site 1-Jul preparation. Improbe cuttings disposal access trail. Collect gamma log from existing well MI-1. 2-Jul Geoprobe and PS-12-1 (PWN) site prep continue. Run water lines. Begin moving equipment on-site. 1 I Len- 3-Jul Still waiting on permit-to-drill but are told we can drill to 500 ft w/o it. Set 10 ft conductor casing and finalize site. Finish geoprobe work. Collect gamma log from existing well PS-5. 4-Jul Drill 10-in hole to 100 ft. 5-Jul Set and cement 6 5/8-in casing to 100 ft. 6-Jul Install diverter system and drill 6-in hole to 290 ft. 7-Jul Drill 6-in hole to 470 ft. Drill 6-in hole to 500 ft. Collect temp log from inside drill pipe. Remove rods and run geophysical 8-Jul logs in open hole. 9-Jul Standing by for AOGCC permit-to-drill. 10-Jul Get permit-to-drill. Drill 6-in hole to 730 ft. 11-Jul Drill to 1000 ft. 12-Jul Circulate hole and run geophysical logs. Prepare to set and cement HW casing. 13-Jul Run casing to 1000 ft and cement. 14-Jul Drill cement from inside casing to 990 ft. Clean equipment and site. Prepare for break. July 15- July 25 On break. 26-Jul Move BOPE from Nome to site. 27-Jul Installing BOPE. 28-Jul Finish installing BOPE and preparing to test. 29 Jul Attempt to run BOP test but hyd bag bursts.Two weeks to get repair parts. Decide to move to next site. 30-Jul Begin moving equipment to PS-12-"(PWN). I 31-Jul Moving and setting equipment at PS-12- (PWN). 1-Aug Set and cement 10-in casing to 10 ft. Drill 9 7/8-in hole to 125 ft. 2-Aug Drill 9 7/8-in hole to 204 ft. Set and cement 6-in casing to 204 ft. 3-Aug Install knive valve and diverter. Drill cement from inside 6-in casing. 4-Aug Drill 6-in hole to 464 ft. _ 5-Aug Drill to 754 ft. 6-Aug Drill to 1004 ft. 7-Aug Clean hole and run geophysical logs. Begin running HW casing. 8-Aug Run HW casing to 1004 ft. Mix and pump cement. Begin moving BOPE into place. 9-Aug Install BOPE. Run and record BOP test for AOGCC. 10-Aug Drill 4-in hole to 1024 ft and perform formation leak test per AOGCC. Drill to 1078 ft. 11-Aug Drill to 1223 ft. 12-Aug Drill to 1249 ft and decide to switch from rotary to wireline core. 13-Aug Core from 1249 to 1294 ft. Trip pipe. Collect geophysical logs. Fill well with abandonment grout and run capped BQ casing to 14 Aug 1294 ft. 15-Aug Cement top 160 ft of annular area. Remove BOPE and begin preparing site PS-12-q(PWN). 16-Aug Moving equipment to PS-12- (lWN). /Vim* CL..)L. Awl-- 3 I tisk 17-Aug Move and set up equipment on PS-12-3 (PWN). Drill and set 5 ft of 10-in surface casing. 18-Aug Drill 10-in hole to 144 ft.Trip pipe and collect geophysical logs. 19-Aug Run 6-in casing to 144 ft and cement. 20-Aug Install knive valve and diverter system. Drill 6-in hole to 263 ft. 21-Aug Drill to 423 ft. 22-Aug Drill to 723 ft. 23-Aug Drill to 983 ft. 24-Aug Drill to 1133 ft. 25-Aug Drill to 1183 ft TD. Attempt to collect geophysical logs but caliper probe becomes stuck at 1065 ft. Attempt to wash 26-Aug free w/o success. 27-Aug Attempt to wash probe free with BQ rods but they become stuck in well at 1040 ft. Abandon probe and pipe recovery attempt. Cut logging cable and cement bottom of BQ rods into 28-Aug place. 29-Aug Mix cement and fill annular space from 160 ft to land surface.Tag cement in BQ at 930 ft. 30-Aug Begin moving equipment from site. 31-Aug Moving equipment from site and on to Nome. 1-Sep Cleaning, packing and moving equipment to Nome. 2-Sep Cleaning, packing and moving equipment to Nome. 3-Sep Cleaning, packing and moving equipment to Nome. 4-Sep Cleaning, packing and moving equipment to Nome. 5-Sep Crew flies home. 16-Sep thru 21- Return to Nome. Rehead logging cable and collect gamma log from PS-12-3 (PWN) to 900 ft. Sep Well name clarification Project well name (PWN) AOGCC well name PS-12-1 TG-1, Permit No.: 212-077 PS-12-2 PS-12-3, Permit No.: 212-109 PS-12-3 PS-12-9, Permit No.: 212-126 I ' Y r 1,*.. y +i ° } ti 140114, 4.401 3r V • * AILANIA re P tg^ #' K } - -1. a _ it 4•-• - ,I ' :', R'F . .;, #,, iiii._ .,(1' . -,,5 ,04-,,2;'. . "..4.i . t 1,*1 44 . . w br Y. 6 d 1' s , I # I 1 =' I I t M p , I „ , •}i yy lr ce 1 ti t A . it ....i 4 t, g , ill'pro 3'.",d�, .4,.f < 1 . y A. Schwartz, Guy L (DOA) From: Markus Mager[markus.mager@alaska.edu] Sent: Wednesday, September 12, 2012 3:57 PM To: Schwartz, Guy L(DOA) Cc: Davies, Stephen F (DOA) Subject: Pilgrim: PS-12-9(PTD 212-126) Hello Guy, PS-12-9 is not abandoned yet. I'm going to Pilgrim again from 09/16-09/19 to get a final temperature and gamma log of that well. Cementing details: The BQ got stuck at 993ft. The annular area (between the 6-in and BQ casings) was cemented to a depth of 180 ft (not 200ft, I triple checked with the drillers) and, to seal off the casing and prevent upflow of groundwater, the inside of the BQ casing was cemented from 993 ft to 930 ft. I will be in my office tomorrow and will give you a call in the morning, best regards, Markus On Fri, Sep 7, 2012 at 11:50 AM, Schwartz, Guy L (DOA) <guy.schwartz@alaska.gov> wrote: > Marcus, > Can you supply more details on this well. Is it abandoned??? You will > need a sundry to do so otherwise... > I don't have any cementing details so don't understand how the well is > currently cemented. Please call me to discuss. > Guy Schwartz > Senior Petroleum Engineer > AOGCC > 793-1226 (office) > 444-3433 (cell) Markus Mager Project Manager Pilgrim Hot Springs Exploration Project Alaska Center for Energy and Power University of Alaska Physical Address: 814 Alumni Drive Mailing Address: PO Box 755910 Fairbanks AK 99775-5910 Phone (907) 474-1143 1 01 N e-1 d O r-1 N O 01 r1 0 n 01 p 1-4 N ` N T--1 v (/I O MN 1411%441 Q .E 0 E rn � r O M I O O O O O O O O O O O O O O O O o 0 0 e-1 N M cr in kD CO Qt O ri palU! q a0 Page 1 of 3 Schwartz, Guy L (DOA) From: Markus Mager[markus.mager@alaska.edu] Sent: Sunday, September 02, 2012 8:35 AM To: Schwartz, Guy L (DOA) Cc: Davies, Stephen F (DOA) Subject: Pilgrim: Timeline for PS12-9 PTD 212-126 Attachments: PS-12-9_flowing_on_08_29.JPG Guy, Here is the requested timeline. 08/25 The crew reached 1183ft. 08/26 The well was cleaned to bottom the morning of the 26th to run geophysical logs. We began running the caliper probe in the afternoon and the probe got stuck at 1065'. The crew attempted to pull out the probe by hand, which yielded no gain. We left the probe in the hole overnight. 08/27& 08/28 The crew tried flushing the hole in the morning to loosen up the probe. When we tripped in, the drillers got the BQ pipe to 993'to flush high viscosity mud to depth. After mixing mud,they began flushing the hole and when they attempted to pull the pipe up, it was also stuck. They tried to pull the pipe by torquing to the max, throttling up the hydraulics, but it could not be moved. Any more effort might have resulted in flaring the pipe at the joints or blowing out the hydraulics. We decided to cut our losses, leave the probe in the hole, and cemented the BQ in place on 08/28 (Note: There is a plug at the bottom of the BQ that was pumped down after the cement. I ran a temperature log yesterday, 09/01, and was able to get down to 930ft). 08/29 & 08/30 When the drillers arrived the morning of the 29th the well was flowing (see picture). The 150F water came up between the surface casing and the BQ. The drill crew got the flow under control with some heavy mud. The drillers started cementing after pumping the mud. They pumped 228ga1 of cement from 200ft to surface and the cement was down 17 inches in the morning. We started demobilizing on the 30th Markus On Sat, Sep 1, 2012 at 8:32 AM, Schwartz, Guy L (DOA) <guy.schwartz a,alaska.gov>wrote: Markus , I was under assumption that u had cemented the BQ casing several days ago. Please provide a daily timeline of events for PS 12-9. Were fluids contantained by diverter to your sump area? Pictures would be good.. 9/5/2012 Page 2 of 3 Guy Sent from my iPhone On Aug 31, 2012, at 10:13 PM, "Markus Mager" <markus.mager@alaska.edu>wrote: > Hello Guy and Stephen, > When the drillers arrived the morning of the 29th the well was >flowing. The 150F water came up between the surface casing and the BQ. >The drill crew got the flow under control with some heavy mud. The >drillers started cementing after pumping the mud. They pumped 228ga1 > of cement from 200ft to surface and the cement was down 17 inches in >the morning. We started demobilizing on the 30th and continued > demobilization today. For identification purposes I had the drillers >weld a sign to the BQ today (see attachment). > This update comes a little bit late, I apologize, but I also had to >deal with a car accident. > > Markus > -- >Markus Mager > Project Manager > Pilgrim Hot Springs Exploration Project >Alaska Center for Energy and Power >University of Alaska >Physical Address: 814 Alumni Drive > Mailing Address: PO Box 755910 > Fairbanks AK 99775-5910 >Phone (907) 474-1143 > Cell (907) 322-7012 >Fax (907) 474-5475 >http://acep.alaska.edu/ > http://energy-alaska.wikidot.com/ > http://www.akenergynetwork.com/ > <PS-12-9 on 08 31.JPG> Markus Mager Project Manager Pilgrim Hot Springs Exploration Project Alaska Center for Energy and Power University of Alaska 9/5/2012 Page 3 of 3 Physical Address: 814 Alumni Drive Mailing Address: PO Box 755910 Fairbanks AK 99775-5910 Phone(907) 474-1143 Cell (907) 322-7012 Fax (907) 474-5475 http://acep.alaska.edu/ http://energy-alaska.wikidot.com/ http://www.akenergynetwork.com/ 9/5/2012 1" , c A1/4 it S i77 .- � r , eta• . 7M . , .— h Y NJ J" �4..r..""w""',411.411, n, nw� < .' • v' .f•` "� a . ♦ •. & *? ✓ . . 4- " + ' , s � R, .J`" r k r 4.,,, ,,,. 4,, p, % , 4 ,, -,,.. ' )i S., A •„,,-.•,',.,- £` ,_ . ...,,,,,::.,-,,,-',". ,,..':,..‘,..t.,,,-„:' ',4: ye 3' � * • a • y . V, e” nP • 4 s .4 - x s ij+i`�". € .. . �• � a .^ t '� rs. P +. r- yr ti ; It Y „ r +«�r 1p I. .N i s A °\ 1 4A .-4 y ¢ t 4 4 ,, i Y1N a'e ,� R am„ -a[ ., . ' ... , . .. . _ . i 7 i..1 f• ,, .• _ 4 ' ( , - , I . , / . . t, . I , .. . -. . , ...,".tr ...,. .. . r o6. 46: ' .: „1. ,--• . ' . - ---- • , _ '. .....NRIMIlk 1 :. ft • -- . 1 fit . . • M".• , ' i• t 4.'..4 1 •' # , a .,... , i ',/#4,,,,.,,,, .. I * I , ' '` 1 , , F, ;* • f ,, ' Litliii.' '7 • . . • i . i .. . . k ; f , # . ,..:-. • 1 * , .r/ `,', ,, .1 . ......... ..'.-.•.-...*„.4*.A , r ., •,,— .'-''.''. - t*'41 1 j ' -•.- , ' 4. v •,-..., ,t e .- sit, .. - . . ,.,;',07-17, S : 7 ' .,...i . 4 \3 ,, , 4, 14 - ',.., - 1 , r A • , ) . --, . •• .. • i . . 4 •f„, .,, . # : ' '* .- . ' ' it. . ' % r , .. . ::. 1,- • 1,. , . „ . . i',-' . I .. f,- • • . • , ,,, 4 . I ' . ) . . .._._ . J . .. . , ,,,,. ,. . • ; I'. . r , . , .. • -.... .. .. . .• ,.,1 . • 0,,• ,,, •. , • . -•.. :$ ,., ,• ••••':',' ,?, , , •• , .,_•.• • ' • ,• , -. • • - ' • % 0 ".• #. ‘0:1- •.' ' It . • • . 4 , i . ..0 . . . • , ' ..7' • 0 t ' $ ''' ,ifiafr.,,ta i:-,.,4•11 '....., - ' :if ,I`1,4,.. .. .: ,.,,1:4 . \ ' ' ' li..., ..-,..0 , i, .... I.- , • 4 ...;:cfli ••• 1, • - ,.. .,. . ,..., . ,.... 1 . N . . • '- . . . ... _ • . — -.... . . .... . ,., .„ ... , .--- ,• . , k '' ,. . ... . ,. .. .. _.. . > Forwarded message > From: Markus Mager <markus.mager@alaska.edu> > Date: Tue, Aug 28, 2012 at 10:57 PM > Subject: Pilgrim: Update for TMT - 08/28/2012 > To: "Coy, Ava" <ava.coy@go.doe.gov>, "Thorsteinsson, Hildigunnur" > <hildigunnur.thorsteinsson@ee.doe.gov>, "Segneri, Brittany" > <brittany.segneri@ee.doe.gov>, Pat Dobson <pfdobson@lbl.gov>, Joel > Renner <jlrenner@live.com>, "Visser, Charles" > <charles.visser@nrel.gov>, Doug Blankenship <dablank@sandia.gov>, > Steve Knudsen <sdknuds@sandia.gov>, Gwen Holdmann > <gwen.holdmann@alaska.edu>, "abaldivieso@aidea.org" > <abaldivieso@aidea.org>, Dick Benoit <dickbenoit@hotmail.com>, Bill > Cumming <wcumming@wcumming.com> > PS Z > All, > The crew reached 1183ft in PS-12A.'at around 18:00 on the 25th and we > believe we hit basement at 1080 ft at this site. The well was cleaned > to bottom the morning of the 26th to run geophysical logs. The > drillers reamed the well in preparation for logging. We began running > the caliper probe on Sunday afternoon and the probe got stuck at > 1065' . The crew attempted to pull out the probe by hand, which yielded > no gain. The consensus on what happened to lodge the probe is a > cave-in at depth that buried the probe. We left the probe in the hole > overnight and in the morning we tried flushing the hole to loosen up > the probe. When we tripped in, the drillers got the BQ pipe to 993' to > flush high viscosity mud to depth. After mixing mud, they began > flushing the hole and when they attempted to pull the pipe up, it was > also stuck. They tried to pull the pipe by torquing to the max, > throttling up the hydraulics, but it could not be moved. Any more > effort might have resulted in flaring the pipe at the joints or > blowing out the hydraulics. We decided to cut our losses, leave the > probe in the hole, and cemented the pipe in place today. > This incident makes logging induction and resistivity impossible so we > will not have a gamma, conductivity, or resistivity profile for,> PS-12-3. Also, we cannot run the Kuster on this winch until we rig up 6(6rj > a new head for the cable attachment (hopefully tomorrow) . ACEP's ,,/v�! > hand-powered winch is our backup to log PS-12-2 again and PS-12-3. W > • > No rain today at Pilgrim, best regards, Markus Q '2� 1401 > 1. 5. 3 > -- > Markus Mager > Project Manager > Pilgrim Hot Springs Exploration Project Alaska Center for Energy and > Power University of Alaska Physical Address: 814 Alumni Drive Mailing > Address: PO Box 755910 Fairbanks AK 99775-5910 Phone (907) 474-1143 > Cell (907) 322-7012 > Fax (907) 474-5475 > http://acep.alaska.edu/ > http://energy-alaska.wikidot.com/ > http://www.akenergynetwork.com/ > -- > Markus Mager > Project Manager > Pilgrim Hot Springs Exploration Project Alaska Center for Energy and > Power University of Alaska Physical Address: 814 Alumni Drive Mailing 2 Schwartz, Guy L (DOA) From: Markus Mager[markus.mager@alaska.edu] Sent: Friday, August 31, 2012 9:23 AM To: Schwartz, Guy L (DOA) Cc: Davies, Stephen F (DOA); Gwen Holdmann Subject: Pilgrim: Update for AOGCC-08/31/2012-PTD 212-126 Attachments: PS-12-9_PTD 212-126_on 08_30_2012.JPG; site_PS-12-9_PTD 212-126_on 08_30_ 2012.JPG PS-12-9_PTD site_PS-12-9_PTD L2-126_on 08_30_2 212-126_on 08... Hello Guy, The email update from Tuesday, August 28, 2012 11:00 PM was about our third well drilled, PS12-9, PTD 212-126. I apologize for the confusion. Since then we cemented PS12-9 between the surface casing and the BQ from 200ft to surface. The site is pretty wet & swampy since the last couple weeks were pretty rainy out here. This makes demobilizing, which we started yesterday, a little bit more challenging. Best regards, Markus On Wed, Aug 29, 2012 at 8:41 AM, Schwartz, Guy L (DOA) <guy.schwartz@alaska.gov> wrote: > Marcus, > Please include the PTD number associated with the well in the email subject line. Also, it is again unclear which well you are talking about. When Gwen was here last week we established a well naming convention based on the site location number . . . not the order of drilling. This should be consistent with the PTD applications and surface locations. > First well: TG-1 = PS12-1 PTD 212-077 > Second well: PS12-3 PTD 212-109 > Third well: PS12-9 PTD 212-126 > As for this last well please send more details on how the pipe was cemented and volumes pumped. (ie to surface etc) . > Guy > Guy Schwartz > Senior Petroleum Engineer > AOGCC > 793-1226 (office) > 444-3433 (cell) > Original Message > From: Markus Mager [mailto:markus.mager@alaska.edu] > Sent: Tuesday, August 28, 2012 11:00 PM > To: Schwartz, Guy L (DOA) ; Davies, Stephen F (DOA) > Subject: Pilgrim: Update for AOGCC - 08/28/2012 > FYI. . . > . . .we are done drilling. . . 1 e-4 Cil cn 1n U) bO o O L o' U- O toi L 0 - (1) 0 r' .. o % LL m 40 �' o C4.4 e-4 a um IMP v c E a IH 0 fo 0 T O .ONO CO aA O ' 1D O ry O _ ct o — 3en r 0 0 0 0 0 0 0 e-4 N cn cf 111 10 (Paas) yiaa Schwartz, Guy L (DOA) From: Markus Mager[markus.mager@alaska.edu] Sent: Friday, August 31, 2012 10:13 PM To: Schwartz, Guy L(DOA); Davies, Stephen F (DOA) Subject: Pilgrim: AOGCC update- PS12-9 PTD 212-126 Attachments: PS-12-9 on 08 31.JPG Lm1 PS-12-9 on D8_31.JPG(148 KB) Hello Guy and Stephen, When the drillers arrived the morning of the 29th the well was flowing. The 150F water came up between the surface casing and the BQ. The drill crew got the flow under control with some heavy mud. The drillers started cementing after pumping the mud. They pumped 228ga1 of cement from 200ft to surface and the cement was down 17 inches in the morning. We started demobilizing on the 30th and continued demobilization today. For identification purposes I had the drillers weld a sign to the BQ today (see attachment) . This update comes a little bit late, I apologize, but I also had to deal with a car accident. Markus Markus Mager Project Manager Pilgrim Hot Springs Exploration Project Alaska Center for Energy and Power University of Alaska Physical Address: 814 Alumni Drive Mailing Address: PO Box 755910 Fairbanks AK 99775-5910 Phone (907) 474-1143 Cell (907) 322-7012 Fax (907) 474-5475 http://acep.alaska.edu/ http://energy-alaska.wikidot.com/ http: //www.akenergynetwork.com/ 1 '" #'' "4.. • # 1 ... q_. • • r • �y 4 " ow f 1Y , *'' S 0 R' ^� : • H14 e N• .. r s fir., •°t r ., • i y tom• , t Not • 4. • • • • i ' ''' r 4 ,,,1 a, ,'.41319,ve Wt.:a . +�. ! r . led;. ),' nom.. .y 5 .' liir . ` r4 *'` . .. - fir• „,s -....,mss �► '` r ,•• z r `` w A . . '1....i': • 14;` • ;as' flit "' F 0 ',,, -_,,-*4. .',..,, s ,c-':e.(:,..,",,, ,...- ,. ,i,. ... i,,, -,. -,..,v- i-i.., ,„ '-'4t, 7,.':, ''' ..,, 1.*„.--,••',:',4„.,,4, -",A,,, li,..4; ,..,,,-.:,,,,,.:.,....! ,,,:„;;,-..,_ ..1,.--. , ,,,,..,,,,,; . , --- ,..„, a € k ,i- .iy" r k 4. w < ii I - i , ,.., it.,,„,, ; „, _ 1 A - T mom I 4 . y .tee AA .d '„,T , ... . 4 ,,...,„-,...„ .. . . . ...., . . . , , . .... .. _ , . . , , ,..,.. , . .,,.. I t -ii.. ,,,, , s ,T, . , , i ... ., � -,,,, . -::, 1• .,.,'. 1 ' - , •-,:A...,,,. ,,,,r,„,,,,,, ,,:.,,,.,_,,,,,..,„ -,„ ., . : ,. , .._ 7 '' , „s*P of' - i, - • s+ �t A_ • '�' 'F Ims' s r "- a #.• �¢.. � . d x 'sem ... t r b -,, t • • ' - , - - . -, --- ' , i .- „,,,.. - ,,,., $014.4 :, '4%*14 ' "y t er a "'t x^(984 � V ',..'14 $'''''' � ��' �P ..i.,',1_,,,- d •' > f eF�� jt���r VY n� i+- r F. Schwartz, Guy L (DOA) From: Markus Mager[markus.mager@alaska.edu] Sent: Tuesday, August 28, 2012 11:00 PM To: Schwartz, Guy L(DOA); Davies, Stephen F (DOA) Subject: Pilgrim: Update for AOGCC-08/28/2012 p5' ��Z I FYI. . . rt.? . . .we are done drillina. . . rorwaraea message From: Markus Mager <markus.mager@alaska.edu> Date: Tue, Aug 28, 2012 at 10:57 PM Subject: Pilarim: Update for TMT - 08/28/2012 10: "Doy, Ava cava.coysgo.aoe.gov>, lnorstelnsson, rillaigunnur <hildigunnur.thorsteinsson@ee.doe.gov>, "Segneri, Brittany" <brittany.segneri@ee.doe.gov>, Pat Dobson <pfdobson@lbl.gov>, Joel Renner <jlrenner@live.com>, "Visser, Charles" <cnaries.vissersnrei.gov>, Doug Hianxensnip <aanlanKLsanaia.gov>, Steve Knudsen <sdknuds@sandia.gov>, Gwen Holdmann <gwen.holdmann@alaska.edu>, "abaldivieso@aidea.org" <abaldivieso@aidea.org>, Dick Benoit <dickbenoit@hotmail.com>, Bill Cumming <wcummina@wcummina.com> All, IVA `? The crew reached 1183ft in PS-12-3 t around 18:00 on the 25th and we believe we hit basement at 1080 ft at this . he well was cleaned to bottom the mornina of the 26th to run geopnysical logs. Tne drillers reamed tne well in preparation tor logging. We began running the caliper probe on Sunday afternoon and the probe got stuck at 1065' . The crew attempted to pull out the probe by hand, which yielded no gain. The consensus on what happened to lodae the probe is a cave-in at depth that buried the probe. We left the probe in the hole overnight and in the morning we tried flushing tne nole to loosen up tne probe. When we tripped in, the drillers got the BQ pipe to 993' to flush high viscosity mud to depth. After mixing mud, they began flushing the hole and when they attempted to pull the pipe up, it was also stuck. They tried to pull the pipe by torauina to the max, throttling up the hydraulics, but it could not be moved. Any more effort might have resulted in flaring the pipe at the joints or blowing out the hydraulics. We decided to cut our losses, leave the probe in the hole, and cemented the pipe in place today. This incident makes logging induction and resistivity impossible so we will not have a gamma, conductivity, or resistivity profile for PS-12-3. Also, we cannot run the Kuster on this winch until we rig up a new head for the cable attachment (hopefully tomorrow) . ACEP's hand-powered winch is our backup to loa PS-12-2 aaain and PS-12-3. No rain today at Pilarim, best regards, Markus Markus Mager Project Manager Pilarim Hot Sprinas Exploration Project Alaska Center for Energy and Power University of Alaska Physical Address: 814 Alumni Drive Mailina Address: PO Box 755910 Fairbanks AK 99775-5910 Phone (907) 474-1143 Cell (907) 322-7012 Fax (907) 474-5475 SMINE iiI1 Alit-.1\ ZEn SEAN PARNELL, GOVERNOR �J ALASKA OIL AND GAS 333 W 7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Gwen Holdmann Director, ACEP/UAF University of Alaska Fairbanks P.O. Box 755280 Fairbanks, Alaska 99775-5280 Re: Pilgrim Hot Springs Field, PS-12-9 University of Alaska Fairbanks Permit No: 212-126 Surface Location: 52' FSL, 919' FEL, S. 36, T4S, R31W Bottomhole Location: 52' FSL, 919 FEL, S. 36, T4S, R31W Dear Ms. Holdmann: Enclosed is the approved application for permit to drill the above referenced exploration well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, ,e ia-4-6i24^ Cathy '. Foerster Chair DATED this 23rd day of August, 2012. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) RECEIVED STATE OF ALASKA ALA. OIL AND GAS CONSERVATION COMMI.._.JN AUG 2 2 2012 PERMIT TO DRILL AQGCC 20 MC 25.005 la.Type of Work: lb.Proposed Well Class: Development-Oil El Service- Winj ❑ Single Zone ❑ lc.Specify if well is proposed for: Drill 2 Redrill ❑ Stratigraphic Test ❑ Development-Gas❑ Service-Supply ❑ Multiple Zone ❑ Coalbed Gas �] (as Hydrates ❑ Re-entry ❑ Exploratory ❑✓ Service- WAG iii Service-Disp ❑ 6Co+►w"*�irk ile Gas El 2.Operator Name: 5. Bond: Blanket Q Single Well r 11.Well Name and Number: "- 1• y University of Alaska Bond No. /0 5 t, jte„Wv / PS- 12-9 3.Address: P.O. Box 755280, Fairbanks,AK 99775-5280 6.Proposed Depth: y2z. (L.12.Field/Pool(s): MD: 1200' TVD: 1200' Pilgrim Hot Springs 4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: 52'FSL,919'FEL,S.36,T4S,R31W Unaatuq LLC/BSNC Top of Productive Horizon: same 8.Land Use Permit: 13.Approximate Spud Date: 8/18/2012 Total Depth: same 9.Acres in Property: 14.Distance to Nearest Property: 1183ft 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: -45 feet 15.Distance to Nearest Well Open Surface: X=665625'Y=4054971' Zone- t GL Elevation above MSL:-45 feet to Same Pool: 16.Deviated wells: Kickoff depth: N/A feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: N/A degrees Downhole: 1075©2500ft Surface: 0 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 12 1/4 in 10 3/4 OD 21.2 ppf sch 40 n/a 6 ft 0 0 6 ft 6 ft n/a -w,t t 11t moLo....£ 9 7/8 in 6 5/8 OD 18.97 ppf sch 40 weldable 140 ft 0 0 140 ft 140 ft Neat cement,60cf 5 7/8 in 2.19 OD 4.2 ppf BQ TFJ 1200ft 0 0 1200ft 1200ft 10 ppg abandonment bentonite grout set BQ on bottom and fill with water 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth ND(ft): 20. Attachments: Property Plat ❑ BOP Sketch❑ Drilling Program Q Time v.Depth Plot ❑ Shallow Hazard Analysis El Diverter Sketch❑Q Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements❑ 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct. Contact Printed Name Gwen Holdmann Title Director,ACEP/UAF Signature (.9 �f ' /�� Phone 907-590-4577 Date 8/19/2012 Commission Use Only Permit to Drill ...., /e-; API Number: • Permit Approval See cover letter for other Number: l 2_/Z50-6310 ' /G C0.- ate: / 4 - requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: 12 Other: Samples req'd: Yes Ef No❑ Mud log req'd: Yes Q No❑ k Aileen 1_ 6 p e e H2S measures: Yes7❑AAC Dr �Diirectional/svy req'd: Yes ❑ No ,/(IT al-e. 1J f 0. app r°4-'-01 GAO AAC ZJ,Q I /C. * W�.e1� IPp+i-r., -z,.s f :.r"Z( I Su.,,.n,,.y # sepia5��dr, t7' 1.9 ,4 rca4.rc�• Q AP ROVED BY THE COMMISSION p DATE: _Z s -i2_ / ,COMMISSIONER DUPUCA E Form 10-401(Revised 7/2009) This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit in Duplicate Pilgrim Hot Springs Project 2012 drilling plan and procedure - additional permit to drill application — Date Submitted:08/15/2012 Application for: • Permit to Drill PS-12-1 Alaska Oil and Gas Conservation Commission (AOGCC) Submitted to: Cathy Foerster Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Submitted by: Gwen Holdmann, Markus Mager Alaska Center for Energy and Power(ACEP) (907) 590-4577,gwen.holdmann@alaska.edu (907)474-1143, markus.mager@alaska.edu I. Background & Purpose ACEP already submitted a total of eight (8) permits to drill applications to the Alaska Oil and Gas Conservation Commission (AOGCC)for the project this year.The two holes drill during the 2012 field season reached 1000ft and 1300ft respectively with a basement temperature of-87°C. Due to the results of the 2012 drilling operation, ACEP decided to submit one (1) additional Permit to Drill application. The proposed well is located on Pilgrim Hot Springs property at USGS Bendeleben A-6, Kateel River meridian. Alaska Center for Energy and Power• University of Alaska Fairbanks•814 Alumni Drive •P.O. Box 755910• Fairbanks,Alaska 99775-5910•Tel: (907)474-5402 • Fax: (907)474-5475 „= ctil , . „ Er ca c a Pilgrim Springs i W W r{iei f .di AP a i ...,/,,, 1 ` � Landiriz Strip r, , , \'',-,.,,,,,Glan'ci) .... \ 4 4 J Nj .,,,.... r--\ F ae 'l`'1 i . \ \ 4. ,.''' • (\,... Figure 1 Proposed well location Property Owner Unaatuq LLC 110 Front Street,Suite 300 Nome,AK 99762 Matt Ganley, Vice President, Land and Resources (907)443-4314 mganley@beringstraits.com Alaska Center for Energy and Power•University of Alaska Fairbanks• 814 Alumni Drive• P.O. Box 755910• Fairbanks,Alaska 99775-5910•Tel: (907)474-5402 • Fax: (907)474-5475 II. Plan of operations Drilling will occur in accordance with Alaska Oil and Gas Conservation Commission (AOGCC) rules and regulations.A detailed drilling plan is attached (attachment 1).We are using an Atlas Copco CS-1000-P6L drilling rig for the drilling operation.Water from the Pilgrim River will be used as drilling fluid at the site. Drilling fluid will consist of straight river water whenever possible. If well conditions require,the project will mix a bentonite slurry consisting of Quik-Gel (Baroid Industries—NSF certified), and river water.A natural cellulosic polymer(Quik-Trol, Baroid Industries—NSF certified)will be added to the slurry to improve borehole stability or circulation conditions if necessary.Quik-Gel is a finely ground, premium- grade, sodium based bentonite, which is commonly used as a drilling fluid.The project expects to use approximately 50,000 gal of water per 2,500ft hole. 11.1 Wastewater Discharge Drilling Waste Solids The project drilled two temperature gradient holes in 2011 and solids were handled, sampled and stored accordingly at the site.The samples were tested and passed the standards set by ADEC. Drilling waste solids were disposed in a sump during the 2012 field season.The sump was backfilled with the soil that was removed to dig the sump and the project will provide closure confirmation to ADEC for the sump, including: o GPS coordinates for the sump location, and o photographs showing the sump after it is backfilled. 2012 drilling operations and waste handling will be similar to the 2011 execution. Upon reaching land surface,drilling fluid and cuttings will flow from the well bore over a set of shaker screens,through desanding cones,and into a shaker tank.The solids, removed at the screens and cones, will be deposited through a chute and into above-ground holding tanks(Picture 1 and 2).The fluid, cleaned of solids,will be re-circulated from the shaker tank down the borehole. A 1,500-ft, 5 7/8-in diameter hole would generate—282 ft3 of cuttings. After setting and cementing a 4-in casing to 1,500 ft,a 3 7/8-in hole drilled from 1,500-2,500 ft would generate an additional "82 ft3 of cuttings. Each of the project's five storage tanks has a holding capacity of "90 ft3. Solids will be removed from the drilling fluid and contained in above-ground tanks.Any fluid that accumulates in the solids tank during the drilling process will be pumped back into the shaker tank or onto nearby land surfaces.The holding tanks will be emptied once full and the solids will be disposed in a 10 ft x 10 ft x 5 ft deep sump. Alaska Center for Energy and Power•University of Alaska Fairbanks • 814 Alumni Drive•P.O.Box 755910• Fairbanks,Alaska 99775-5910•Tel: (907)474-5402 • Fax: (907)474-5475 kw s i . Picture 1 Rig and Equipment at 59 in 2011 T.s '_ a�f t, .+.: .rr cX "t rr $ 4 "mac A xtr. t b t* � zt,.g ♦ �. .-5 , N Picture 2 Shaker and Storage Tank with Solids at S9 in 2011 After drilling is completed at the site the sump will be backfilled with the soil that was removed to dig the sump.The project will provide closure confirmation to ADEC for the sump, including: o An estimate of the total volume of drilling waste disposed o GPS coordinates for the sump location, and o photographs showing the drilling waste management in operation, and the sump after it is backfilled. Alaska Center for Energy and Power•University of Alaska Fairbanks• 814 Alumni Drive•P.O.Box 755910• Fairbanks,Alaska 99775-5910•Tel:(907)474-5402 • Fax: (907)474-5475 Upon completion of the drilling, drill fluid in the borehole and shaker tank will be pumped to the sump where the solids can settle out and remaining fluids will be pumped onto nearby land surfaces. Extreme care will be taken to ensure that the sump locations are not close to any open water bodies. 11.11 Water Withdrawal Location Water will be withdrawn at a rate of 2,500—10,000 gallons per day using a 3-inch centrifugal pump(avg. 20 35 gallons per minute).The maximum amount of water that will be used in 2012 (June to mid- September) is estimated to be 250,000 gallon (Temporary Water Use Authorization TWUP A 2011-30& A2011-125). Our pumping rate during flushing of the well or rotary drilling,the maximum rate will be about 150 gpm. Since fluid is being re-circulated (assuming no circulation loss into formation)the gpm estimate multiplied with the minutes drilled does not equal the amount of fluid used. Weare providing a high estimate of usage due to the possibility of circulation loss. If we encounter lost circulation,the pumping rate does equal the fluid use estimate which is the max. of 10,000 gallon/day. The water intake locations and the intake system are shown in Figure 2, 3 and 4.We are planning to pump water from.the same locations as in 2011 and to use the same system set up.The intake barrel has holes in the sde which are covered with 0.04 mesh to prevent fish impregnation (Fish Habitat Permit FH11-III-0052). � N d v qt a 14:i'-*,,, t[ 5lg '' # � ate-' d. _ . . F €, i ," �. -: :iti '-'' 'Zfi-o:Virt4,..;a j:1141i''' ++;•,,,,,,*li,,,:+, -,:;:i-,,,I+7 digit " sa.'t ,;,-...0:"„„:":141:: k se aM*, m 3 i';');'' '$ p '• t k x r s��°a goy°i � .� � pG���,,'B �, y�".� "' 9• a iic# Ali �r� �� t (� I °"� 5 ":4' �..itif ' ,,,,,p1•4101k1,— Cns°s' il (t, HSI « # a� , '1=74', ,,,,,.';:vi ti� "M� Icy.y,,'-''$‘4,‘.-'%'„i �j yyyy,���'�yl� iI fit .a e� � � i � " f �?V' (� �.� � ! °� ��•+ {%�,,w � "�� 4� }�' 3 "� lift4P' f b 4, ' j #S. 4 Safi � w I3'v, � avp b �4,;:'4,4A4,..1,:;,11:,-,%„, "44, � ,gyp` 8µ h �i{ ,a# ,� � ,�` '14,,,,:s-',4,,,„,, F � �.P i z. t 7 � _ ';‘,"47'.w„,,,,,- es, y to 3,. # 4''roo °A "a Ira � `',..r.,'.„.!)-:...,;,'...1,.:..!........, 3 °-:. Ta ' ' t .S a ,. k "-" '-'114,.*" 1� r:�.�- k � wry 1 !'�.. 44 ' ' 'r.'. '. ..t A . Alaska Center for Energy and Power•University of Alaska Fairbanks• 814 Alumni Drive•P • .O. Box 755910 Fairbanks,Alaska 99775-99775-5910•Tel:(907)474-5402 •Fax: (907)474 5475 Figure 2 S9&S1—2011 drill sites and water intake locations do r �,* rl�w1 � �.-. kxe4� 'vim..-f✓ a xA aarars."6 'a" el '1 ' M t9I„At �di ATk k""�� i,Aa+ "` ,-1:4" °�(o Swit, 41.,W11,6,1,-1,10` %Picture 3 S1 water intake Picture 4 S9 water intake Water intake location Si and S9 ace on Mary's Igloo Native Corporation (MING) property located at USGS Bendeleben A-6, Kateel River meridian,Township 4S, Range 30W, Section 31. Property Owner Mary's Igloo Native Corporation (MINC) PO Box 650 Teller, AK 99778 Richard Komok, President (907) 642-2308 m_igloo@hotmail.com Thank you for your attention to this application. Sincerely, Gwen Holdmann Director,ACEP Attachment 1- proposed drilling methodology and drilling fluids program Attachment 2-well sketch Attachment 3—detailed drilling point information Attachment 4—stability analysis Attachment 5—Permit to Drill—application Alaska Center for Energy and Power• University of Alaska Fairbanks• 814 Alumni Drive•P.O. Box 755910• Fairbanks,Alaska 99775-5910•Tel: (907)474-5402 • Fax: (907)474-5475 Attachment 1 Proposed Pilgrim Springs drilling methodology for deep temperature-gradient wells 1. Set up drilling equipment on site. a. Site size is"' 100 ft x 100 ft i. Minimal site disturbance is anticipated ii. Disturbed top soil will be scraped off with a front-loader and set aside in separate area for use in site reclamation. b. On-site equipment will consist of: i. Atlas-Copco P6L drilling rig set on fabricated wooden structure (12 ft x 20 ft) ii. Drill pipe pallet(10 ft x 30 ft) iii. 600 gallon shaker tank w/sump pump(12 ft x 8 ft) iv. Skid-mounted Gardner-Denver 200 gpm duplex mudpump (12 ft x 8 ft) v. Four 800-gallon drill cuttings holding tanks(8 ft x 6 ft ea) vi. Light tower(8 ft x 6 ft) vii. Storage trailer(15 ft x 8 ft) c. Mud sump dimensions will be 3 ft x 3 ft x 2 ft deep. Drill mud will flow from the well into a short(10-15 ft) dug ditch and into the sump. A 200 gpm sump pump will transfer the mud from the sump to the shaker tank. 2. Mix water-based bentonite drill mud.Additives used will include: a. Quick-Gel high-yield bentonite (hole stability,circulation control,clay-shale control) b. Pac-L and Pac-R powdered cellulose polymer(clay-shale control,water loss,viscosity control) c. Baroid 41 barite weighting material (mud density control) if necessary 5 3. Pick up 121/4-in bit, drill and drive 10%-in conductor pipe to 6-20 ft as conditions warrant. 2 4. Drill 9%8-in vertical hole with bentonite mud to 140 ft. 1' > 4Ck a. Condition mud and circulate to clean hole. rl b. Run caliper log to determine well bore volume. 5. Run 6%-in schedule 40 casing(18.97 lbs/ft)to bottom and cement from bottom up to surface. a. Mix and pump 110%cement based on calculated caliper log volume. b. If cement failed to return to the surface, conduct top job by tagging the top of cement with a 1-in tremie pipe and pumping additional cement through the tremie pipe to bring cement up to the surface 6. Pull 10%-in conductor pipe. v 1,, /61* foo py,i 7. Install 6-in ID low-profile full-opening 150 psi, 300°F knife gate valve and diverter head on flanges welded to the 6%-in casing(see attachment). a. Install port and 2-in 1500 psi valve below the 6-in gate valve for kill line attachment. 8. Install 57/8-in rotary(tricone or PDC) bit and drill to bed rock(1,200 ft) a. Collect drill cuttings every 10 ft. b. Continuously monitor drill fluid in and out temperature and record every 10 ft. Alaska Center for Energy and Power•University of Alaska Fairbanks• 814 Alumni Drive •P.O.Box 755910• Fairbanks,Alaska 99775-5910•Tel:(907)474-5402 •Fax: (907)474-5475 • c. If drill fluid temperature exceeds 150°F, stop and run Kuster temperature log inside drill rods to bottom of well to determine true formation temperatures. d. If borehole temperature of 280°F is encountered, cease drilling, circulate, and remove drill rods from well. 9. Remove drill rods and run geophysical and temperature logs(assuming max well temperature is within tool operational limits). a. Geophysical logs run will be natural gamma, resistivity, conductivity, and caliper. 10. Trip drill rods to well bottom, mix abandonment bentonite grout, and fill well with grout. 11. Remove drill rods and hang BQ casing(2.19-in OD, 1.81-in ID) with bottom plug to total depth. a. Fill BQ casing with fresh water while running to total depth. 12. Cement top 100 ft of annular area between 6%-in schedule 40 casing and BQ casing using 1-in tremie pipe. f ems, re, ,S-a`'/'.9— 13. Install 2-in lockable protective surface valve on top of BQ casing. —� 14. Rig down, clean up, decommission sump, and remove all drilling equipment and supplies from well site. Plug and abandoning procedure(forml0-403 will be submitted separately) 15. After collecting final temperature log, fill BQ casing with silica sand from well bottom to 100 ft below land surface. a. Slowly pour sand from land surface to avoid bridging. i. Monitor depth to sand with tagging tape. 16. Install 1-in tubing inside of BQ casing to 100 ft, mix cement,and pump to surface. a. Leave 1-in tubing in place. 17. Excavate to 3 ft below land surface, cut and remove 6%-in, BQ, and 1-in casings. a. Save excavated material for use as fill e c"`- 'S `C 18. Fill excavation with saved material and reclaim site. 7_.o ' a. Use front-loader to spread and smooth top-soil material removed and set aside during initial site preparation. Alaska Center for Energy and Power•University of Alaska Fairbanks• 814 Alumni Drive •P.O.Box 755910• Fairbanks,Alaska 99775-5910•Tel: (907)474-5402 • Fax: (907)474-5475 Drilling Fluids Program—Pilgrim Hot Springs Exploration Wells The hole will be drilled using standard fresh water bentonite drilling fluids.Additives to be used include (all listed products are NL Baroid trade names): • Quick-Gel high yield bentonite (hole stability,circulation control, clay-shale control) • Pac-L and Pac-R powdered cellulose polymer(clay-shale control,water loss,viscosity control) • Baroid 41 barite weighting material (mud density control) • 2-3%micronized cellulose (water loss, lost circulation control) Maintain a density of 8.8-9.0 ppg unless concerns of formation pressure dictate changing the density. ' Drill fluids will be monitored for viscosity,weight, and temperature on a continuous basis. Drilling fluids will have cuttings removed and will be recirculated via a 600 gallon trailer-mounted shaker system incorporating shaker screens and centrifugal desilting cones. Cuttings and used drill mud will be contained in above-ground tanks.At project's end, cuttings/mud will be disposed of per Alaska DNR requirements. Rotary drilling and reaming operations will be conducted using a skid-mounted Gardner-Denver 5"x 6", 200 gpm,duplex mud pump. If returns are lost,drilling may be continued using fresh water with polymer sweeps prior to - connections. Maintain sufficient barite on location to raise the weight of 2 (two) hole volumes a total of 1 ppg if needed while drilling with mud. Alaska Center for Energy and Power•University of Alaska Fairbanks•814 Alumni Drive • P.O.Box 755910• Fairbanks,Alaska 99775-5910•Tel: (907)474-5402 •Fax: (907)474-5475 Attachment 2 Drilling Rig Pilgrim Springs wellhead assembly 4— drill rod Valve 100 psi rubber seal High pressure discharge hose Diverter ► T-fitting t. head A 100 psi 1 0-- ,;z„-�}i"_r i, compression * coupler aM- =mono Washington Diverter photograph Valve Rotating Control Heads 100 asi sate valve Inc:Divertech A Model 3022 1500 psi kill line 0 valve/port—I. ^ a Fluid discharge to Deserter� sump and shaker tank °mpteS�l coupler Land surface 6 518"OD conductor casing cemented to 140ft below land surface 1.- Alaska Alaska Center for Energy and Power• University of Alaska Fairbanks • 814 Alumni Drive • P.O. Box 755910• Fairbanks, Alaska 99775-5910•Tel: (907)474-5402 • Fax: (907)474-5475 • Diverter assembly l and surface 9 7/8-in hole 6 5/8-in casing drilled to 140ft cemented to 140 ft BC1(2.19-in)set to 1200, ft into bed rock 5 7/8-in bole drilled to 1,200 ft into bed rock Abandonment bentonite grout from well bottom to 100 ft below land surface(b1s), cement ft om 100 ft bis to land surface Alaska Center for Energy and Power•University of Alaska Fairbanks•814 Alumni Drive•P.O.Box 755910• Fairbanks,Alaska 99775-5910•Tel: (907)474-5402•Fax: (907)474-5475 Attachment 3 Proposed drill site locations—2012 drilling program at Pilgrim Hot Springs ro ...—. W �,�ILo. �E . ...to wow : 464.m... 1,36063.3631130301, 203013.93345000. 405593/.3/331303. 6660/130056.10060C 36 369 413 1303.000330GOOM 3.3677/43.3 -134.3273.373001% 1295333.363.04.09 302313.807791000X 403•837.421111002DOC 63330.6272•00(KK 33 2131 1961 311.330000300C 6.9311919M •133.119541129“ 17.02EL1313.0000r, 201136.M76131000CK 3053302.2913.000[ 366613.3873610030e 31 San 913 363.0000000300[ 33.09033,29531.0 464.92141.33.19“ 12.393311.32210000.0 203033.131.1300.9X 034..2993.3003C 360261.3111233000“ 1339 SON 333.0.3,20.0. 01093.33)16 163.3132.9932. 1295284.0109503CODe 203247.366441360X 3033041.3923303000C 663820.134731003“ al .1.3 1117 2,......., 1,13.1 6.91042,5540. 444921710000C 1236240.9313806000( 303030.384923000% 4055903.515100030X EI•4303.014120000f 36 2. 1012 .15.00.00,000( � 00 :; ,34,. 3.3.1323033.3.132303003 ,,..,m„0 .,N,,,.,. t ,o,�,. , 403.911.3910006.001,1 ,d,,,.,.,,,,0. 911 SI .1mo0C Alaska Center for Energy and Power•University of Alaska Fairbanks• 814 Alumni Drive •P.O.Box 755910• Fairbanks,Alaska 99775-5910•Tel:(907)474-5402 • Fax: (907)474-5475 Attachment 4 Pressure-Temperature Stability—Pilgrim Springs Exploratory Wells Exploratory wells are scheduled to be drilled in the Pilgrim Springs KGRA(Known Geothermal Resource Area during the summer of 2012. A key question regarding the wells is whether it is necessary to drill with a blowout preventer in place. Evaluation of such a need includes determination of the temperature-depth profile at which the saturated steam pressure equals that exerted by the borehole- filled mud column.Saturated steam absolute pressures, in psi,vs.temperature, in °F,were computed with the Antoine equation via use of an on-line calculator, available at www.watervaporpressure.com. Gage pressures, computed by subtracting 14.7 psi atmospheric pressure from the absolute pressures, are plotted as the red line in Figure 1.The mud column,for a weight of 9.5 lb/gal., exerts a pressure of 0.495 psi/ft, resulting in the stability relationship shown by the black line in Figure 1.As an example, from Figure 1, if an ambient temperature of 350°F were encountered at a depth of less than 250 ft, the mud column confining pressure would be inadequate to prevent pore water from flashing to steam, resulting in a blowout, whereas encountering that temperature at greater depth should not cause a problem. 0 0 100 — — 100 — 200 — Temperature — 200 N w Pressure Unstabl Stable 0 300 — — 300a. 400 — — 400 500 I I 500 200 250 300 350 400 Temperature,°F Figure 1. Graph showing the temperature-depth relationship governing blowout potential in a geothermal system.The black line provides the depth at which stability occurs for a specified temperature, and the red line the critical pressure, in psi. The maximum temperature for which computations were made is 400°F, based on geothermometry using water chemistry, as provided by Liss and Motyka (1994). According to that reference,the silica geothermometer provides a geothermal source water temperature of 275 °F;the cation geothermometer(Na/K, Na-K-Ca) a water temperature of 300°F; the K-Mg geothermometer a water temperature of 320°F; and the Mg-Li geothermometer a water temperature of 375°F.The maximum geothermometer temperature was rounded up to 400°F to provide a probable upper limit to the Alaska Center for Energy and Power• University of Alaska Fairbanks• 814 Alumni Drive • P.O. Box 755910• Fairbanks, Alaska 99775-5910•Tel: (907)474-5402 •Fax: (907)474-5475 temperature likely to be encountered at depth. Note that this temperature maximum must be encountered at a depth of less than 500 ft to result in blowout potential. The minimum temperature in the stability chart is 212 °F, which is higher than any temperature measured in temperature logs of wells drilled in the Pilgrim Springs KGRA. Representative temperature logs of 4 of the 6 legacy wells (PS-1, PS-3, PS-4, and MI-1, drilled in 1982 and 1983 [Kunze and Lofgren, 1983]),and the two wells drilled in 2011 (PS11—S1 and PS11-S9)are shown in Figure 2. Note that the maximum logged temperature is less than 200°F. 0 ,....;.:... 100 — — �, 200 — — ,� PS11-S9 Geo 1 0_ PS11-S1 300 — Geo 3 - --— PS-1 PS-3 PS-4 400 — MI-1 500 I I ' I I 40 80 120 160 200 Temperature, °F Figure 2.Temperature logs for selected wells in the Pilgrim Springs KGRA, showing that maximum temperatures are less than 200°F. Temperature logs were also obtained from several GeoprobeTM wells installed to depths of 65 to 100 ft in 2011. Selected logs are shown in Figure 3. Note that maximum temperatures are less than 200°F, whereas instability at a depth of 100 ft requires a temperature of about 300°F (Figure 1). Alaska Center for Energy and Power•University of Alaska Fairbanks• 814 Alumni Drive•P.O. Box 755910• Fairbanks,Alaska 99775-5910•Tel:(907)474-5402 • Fax: (907)474-5475 0 20 — a) 40 — 1111111 a 60 — geo_15 geo 6 - - geo 8 geo 9 80 — geo 16 — geo 13 100 50 100 150 200 Temperature, °F Figure 3.Temperature logs for selected Geoprobe wells. In conclusion,geothermometry suggests that there is a potential for water temperature at depth to reach about 400°F. If temperatures of 220 to 400°F were encountered at depths of less than 500 ft,the potential exists for a blowout to occur. However, none of the eight wells drilled to date have encountered temperatures greater than 200°F. Based on these facts,we recommend that drilling progress without a blowout preventer, but that mud temperature be monitored.Should mud temperature reach a specified threshold, say 200°F, drilling would be interrupted to monitor bottom- hole mud temperature. If estimated bottom-hole temperature approached that indicating instability, as shown in Figure 1,the blowout preventer would be added to the drill string. References Kunze,J.F., and Lofgren, B.E., 1983, Pilgrim Springs,Alaska geothermal resource exploration, drilling and testing: Geothermal Resources Council,Transactions,v. 7, p.301-304. Liss,S.A. and Motyka, R.J., 1994, Pilgrim Springs KGRA, Seward Peninsula,Alaska:Assessment of fluid geochemistry: Geothermal Resources Council Transactions,Vol. 18, p. 213-219. Alaska Center for Energy and Power•University of Alaska Fairbanks• 814 Alumni Drive•P.O.Box 755910• Fairbanks,Alaska 99775-5910•Tel: (907)474-5402 • Fax: (907)474-5475 ! l . . . . . . . 11111111 |!§■§E M 1 'W EIR " ■]§:01 ,._'Ag,,, ) I!HUIII ;_ gRnIS■n1 VT2 M hil ; §§§111111 FAFE.q , , riiHli)!� Ih Wi i ||||||| ,§())|iid IIM P is L9.9§;; r2|§§||||| 7iF I \\/ |;§|!§)|| Z ;;|§§:,. 14 § ,sIg 'le;• .031311333 % IIIW§|| b )E§) §|§-r Q §§§;;;;§§ / ,,lr2,r,Ttor2e �,1/1 § § | r7 ) N ( § 2 . T. >�.w�,\n�.� \ , . } f \ ACEP Ala's' Cpnt,,if!'FIWT aTl(t P i' 6-29-10 Preliminary Reconnaissance Trip Report Pilgrim Hot Springs Geothermal Exploration Prepared by:Peter Illig,Alaska Center for Energy and Power,University of Alaska Fairbanks Goals Our preliminary trip to Pilgrim H.S.was intended to locate, map, and determine the status of all 6 wells located at Pilgrim Hot Springs, including those on adjoining MINC land, and to get a general feel for stable ground in the area and potential challenges associated with ground-based surveys planned for later this summer. Notes on Geographic Coordinates When acquiring GPS points for this project,we determined it would be best to use Universal Transverse Mercator(UTM)as normal distances between lat long lines are distorted due to the high latitude arctic location of the site. UTM provides an easy to use square grid system. For this report I used NAD 1927 Alaska (5003),and the units are in meters. Please make sure that when using coordinates in the area to use this coordinate system. Site Overview Pilgrim Hot Springs is road accessible, although the last mile or so is in bad shape.There is a fair amount of stable ground in the surrounding area,and it seems possible to access all 6 existing wells with equipment needed to replace the wellheads without the aid of helicopter during appropriate times of the year.There are numerous historic buildings, including the church,dominating the north section of the area.To the south is the MI-1 (see figure 7), with the Mary's Igloo well being furthest west. Well Descriptions We were able to locate all 6 wells during the trip,and have provided current descriptions of their condition below,with images from the wellheads included in Figures 1-6. Figure 7 shows the relative locations of all the wells. My colleague, Dan Brotherton, is preparing a plan to refit wellheads for all but one or two of these wells so they can be accessed to collect additional data.We have located the original well completion diagrams and other critical information related to the original drilling program in the report'Results of Drilling,Testing, and Resource Confirmation—Geothermal Energy Development at Pilgrim Hot Springs,Alaska' prepared by Woodward-Clyde Consultants in 1983.This report will be very helpful in developing a plan to rework the individual wells as needed. PS-1 (0503536mW 7218438mN) This well is located furthest north (closest to the church and nearest the main trail). It may very well be the hottest of the wells and appears to have significant artesian flow as evidenced through the leakages. The wellhead has a thick layer of silicious deposits on the exterior which has capped some of the leaks. This well will need to be refitted for further use. PS-2 (0503477mW 7218374mN) Located SW from PS-1 is P5-2.This well seems to be in fairly good shape,and is marked by a large white PVC tube. It is located close to the ground, and does not seem to be leaking. It does not appear necessary to replace this wellhead, although access with appropriate instrumentation may necessitate retrofitting a 2in valve to the wellhead. PS-3 (0503411mW 7218346mN) West of PS-2 is PS-3. It stands out clearly when surveying the area due to its higher wellhead compared to the others. It is also leaking, and will require refitting in order to access the hole.The silicious seal has sealed past cracks in the metal, however there is a constant artesian flow from at least unsealed leak. PS-4 (0503475mW 7218298mN) This is the well which feeds the main hot tub on the property. It leaks considerably, and has a few tubes connected to the wellhead which are presumably used to feed the tub.As with all the wells described thus far, it will require extensive work to be fully operational. PS-5 (0503478mW 7218122mN) PS-S is the located furthest to the south.Additionally, it is in the best shape of all of the wells.The valves seem to be operational,and there is little rust on the wellhead. Hot water comes out of the valve that we tested which is attached to a garden hose. Getting to the well should not present an issue, however it should be noted there is a lake that was covered with a floating mat of grass that both Dan and I fell into. MI-1 (0503262mW 7218327mN) MI-1 is located furthest west on the field. It was drilled for a hot water source on behalf of Mary's Igloo Native Corporation (MINC). It has extensive damage to the upper part of the well,where a large crack can be seen in the wellhead.The flow is constant from the crack, with much of it being sealed with silica. This wellhead should also be replaced if it is to be accessed in the future for research or development purposes. Conclusions Dan Brotherton will be writing a report suggesting further steps to be taken on the existing wells to make them operational.This report will be shared with the well owners, Unaatuq, LLC and MINC.The next step will be to map culturally sensitive areas(grave sites, historical buildings,etc.)and property boundaries.This task is scheduled for late July or early August. Prior to this trip we will set up a phone conference with all the parties involved to address questions and concerns regarding that trip,to go over schedules, and to develop a backup plan. Figure 7,which is located on the next page, includes all of the well locations and some of the buildings on the property. Once more information on historic sites,and other important cultural features are identified,they will be added to this map.Any future drilling objectives will take all of this information into account so that any effects are minimized. For additional information or questions about this report please contact: Peter Illig,ACEP illig.ak@gmail.com 907-602-1332 (cell) 4 , •.„' r, t, --1 r,.04 z a .4 S'{" , b , A 4, 4,.. . tr . iis SS IY,,'. j J a. v ,, i . r• Figure 1.PS-1 �1.,s /} \� $ , ,) 4 Ito , j' !1 ' ' fit ,,,/ , � i fr; 44V 44� ,44. e !, ,i . c; ` r-to .SP"4.---- \ I .' - ,.„- ..-- t'E . i i Figure 2.PS-2 Alk P. 40- , 1 4.;li, ' 'ir.r r'"% I s or A t y 1 4 r 'i t 1411, .. , .1 ) *If Alt, ^Yeti ��- i . . ' .'f• Figure 5.PS-5 ti",• 144-7' ' ' :''' ', .'' 14'4;,' i ••'''':4 • ,,,,,,. 0 . . , . .. ;v. '8.' 4 r'ir 4 : / 4 / , • l ....<...,:i'',' „A.'. -*It 10r S m y 4.4*. 4pa. "�k 1. �. ( - , , • ,C A s �1 i, *. , i 7219000 mN te?t',-4 `• '. . i 1503000 mW •, ;..r *t,: '';` ', 4:.. 1 '2''?t r , : r 4'- is w • • , • , ib' Wx ' k'r r1f I. I,. ' :t..••••y r, f . le • -0., 4,c.' X -. ` .7 .. • i At.,'ti, ' � � 4.1t* F t ;;IN ,e • . . 91, 7 9 i;'! -:-' lk '1 t,, i, '«s$ ,'' ' 4 _.'� . :4' ~. A Meters Legend 0 165 330 660 990 1,320 N Man Made Structures ' Wall Locations 1 :9 386 1 centimeter = 94 meters n Figure 7.Map of Pilgrim Hot Spring Well Locations /V Page 1 of 2 Schwartz, Guy L (DOA) From: Gwen Holdmann [gwen.holdmann@alaska.edu] Sent: Wednesday, August 22, 2012 6:32 AM To: Davies, Stephen F (DOA); Schwartz, Guy L(DOA) Cc: Markus Mager Subject: Pilgrim: AOGCC permit to drill application Attachments: Permit to Drill.xls; AOGCC-Permit Application Request-ACEP_08_15.doc; drilling_points_2.xls Guy and Steve, I just spoke with Markus and I think I can clarify the situation. Attached is an excel spreadsheet titled 'drilling_points_2',that was included as Attachment 3 in the Permit Application Request I brought in Monday. The permit I hand-delivered was for a new site, with site ID 9, but I don't think this was clear. On the attached spreadsheet,we included two extra columns for well names to help clarify things - one for the ACEP proposed well name and one for the well name on the AOGCC permit. rt-- Regarding LRegarding modifications compared to the previously submitted proposals, this one limits total depth to 1200 ft. In addition, for PS-12-3 We proposed setting HW casing and installing the BOP at a depth of 1000 ft. Since we drilled that well to 1294 ft w/o encountering high pressures or temperatures (and only about 100 meters distant from this newly proposed site),we are asking to drill PS-12-1 to bedrock+ 100 ft(estimated total depth of around 1150 ft)w/o setting/cementing HW casing or installing a BOP. Co" n Ce. w r lar 5Ar Gwen . /L- ? w 30s .4_...1 Ii Forwarded message From: Gwen Holdmann <gwen.holdmann@alaska.edu> Date: Fri, Aug 17, 2012 at 8:52 AM Subject: FYI - Pilgrim: AOGCC permit to drill application To: "Davies, Stephen F (DOA)" <steve.davies a alaska.gov> Stephen, I am planning to deliver this package in person on Monday. (i%\ (t\\cm I h lcl11121nn. Director ctol' \1aska ( enter liar 1 and Pu\\er 1 Ili\crsif\ ul Alaslka I'h\sicaI Address,: i 14 \Iuillni I)ri\c �luilini \cIdrek,s: p( ) Iio\ 75:;c)1() I hanks \K 99775-59I(I ('cl I.(907) 590-4577 www.uafedu/acep 8/22/2012 Page 2 of 2 f r Gwen Holdmann. Director Alaska Center for Energy and Power University of Alaska Physical Address: 814 Alumni Drive Mailing Address: PO Box 755910 Fairbanks AK 99775-5910 Cell.(907) 590-4577 www.ua£edu/acep 8/22/2012 Page 1 of 3 Schwartz, Guy L (DOA) From: alanbailey@geothermalresourcegroup.com Sent: Thursday, March 01, 2012 12:51 PM To: Schwartz, Guy L (DOA) Cc: Mary Ohren; Jonathan Hernandez; Davies, Stephen F (DOA); Arthur C Clark Subject: Re. Pilgrim Hot Springs Drilling Procedure Attachments: Husky Core Rods.pdf; Geothermal steam from HS-2 DG.jpg; Hot Springs Well Steaming.JPG, Leak Off Test Procedure.docx; TC Geolite @ 180F_206-190.pdf; TC Geolite @ 140F_124- 104.pdf; BOP Testing procedure.docx Guy,here are my responses to the questions: <!--[if!supportLists]-->l) <!--[endif]-->Can you forward me the casing and drilling rod specs please. I don't have these in my standard oilfield handbooks. The 6-5/8"conductor appears to be 6'schedule 20/X-40 line pipe. I've attached a set of tables with core tubulars specs from one of the manufacturers. Core guys don't have any standards equivalent to API,but it's all 4130 steel and as such they're all fairly close to what's in the tables. I am going to recommend that they have someone like Weatherford or Davis Lynch manufacture float collars and guideshoes. 2)How does the diverter attach to the 6 5/8"casing? I saw some comments regarding a compression lock in an earlier email. They usually attach with a compression lock,sort of like a Dresser sleeve. They come flanged too,but I think the USGS has the compression style,and this would may be a better choice with limited space below the"mule shoe". What I think they'll need to do is take a weld-neck flange and weld a short stub(1 foot or so)on top for the compression fitting to attach to. 3)What is the DSA mentioned in step 18.1 We may need a double-studded adapter to cross over to the preventer. I'll need to review the wellhead setup with the driller once vendors with this small equipment have been tracked down. 4)Can you run me through the max anticipated surface pressure calculation... Is this from a steam table or calculated from BHT and depth? It's from the steam tables. Geochemistry shows that the actual upflow from the reservoir may be as hot as 300 deg F from adepth of 480'. We're in the outflow and there's nothing even close to that temperature,but we're erring on the side of caution. If we found 300-degree fluid,we theoretically might see pressures of around 80 psig at surface. 350-degree fluid might get us up to around 135 psi,like we saw at Akutan.The hot springs around the property are allhydrostatic or slightly sub-hydrostatic, so high artesian pressure doesn't appear to be a concern. 5)When the BOP rams are tested is there a test plug installed or is the casing string tested at same time? Can you give me adetailed procedure for testing assuming pipe rams will be used. Will there be rams for the 2.19"casing too?Are there VBR available to cover the drilling rod as well as casing? We'll probably need to go ahead and test the casing at the same time we test the surface equipment. With a fully-cemented annulus,it will generally test just fine. We'll perform the BOP according to AOGCC's preference—normally a low pressure/high pressure test I believe. I have attached a procedure that I will include in the overall drilling procedure. One problem may be with the Regan Torus,if we end up using it. They're pretty old-fashioned and they don't have a pressure assist like a modern Hydril. The low step test may not hold a nice flat line and the test pressure may have to be increased. As for pipe rams for the BQ casing,I'm doubtful of finding them without having to have them poured. 6)What is the min LOT value that you can safely drill aheadwith(step 30)? There's no indication from a geochemical standpoint of anything really hot(say 350degrees or above)so I feel we're OK with anything above about 0.5 psi. I will have them test for a wet shoe prior to drilling out,which I will include in the main procedure. I've attached a copy of the LOT procedure. 7)Do you have a choke manifold setup and piping diagram available. Is choke and kill line piping threaded,welded or knockup? I haven't included a choke,only a diverter line. These little holes are normally killed by bull-heading,and we're not expecting to have to circulate out anything non-condensable. The piping on the kill side will be a high pressure hose from the pump and 3/1/2012 Page 2 of 3 will be threaded. The blow down line will probably be flexible back to ground leNel then be straight pipe with anchors. I've attached a picture of what we used at Akutan,the steam in the picture was from a 358 degree entry we encountered. It looked pretty dramatic and was noisy as hell,but we killed it with a couple of barrels of cold water,and kept it dead. 8)Do you have to nipple down the BOP before landing and cementing the 2.19" (or 2.36"?)B-rod casing?(step 36) That exposes you to well control issues since well is not hydraulically isolatedyet. We can get around that by taking cement returns through both sides. ill change that in the procedure. 9)1 normally get a cementing detail also for each string. Type cement,sacks,yield,and estimated top of cement. I've attached the lab tests for the last two batches of the pre-bagged blend 1 recommend. I would use this as a 13.5 ppg blend with 35 or 40%silica flour on the intermediate and long strings. All casing strings are to be cemented back to surface. Alan Bailey Manager of Engineering Geothermal Resource Group. Inc. alanbai ley@geothermalresourcegroup.com 760-341-0186 Office 760-341-9673 Fax 775-304-3253 Cell www.geothermalresou rcegroup.com (deem!Resource Reap TAPPIRB THE EA1TI1 ENEMY The contents of this email message and any attachments are confidential and are intended solely for addressee.The information may also be legally privileged.This transmission is sent in trust,for the sole purpose of delivery to the intended recipient-If you have received this transmission in error,any use,reproduction or dissemination of this transmission is strictly prohibited.If you are not the intended recipient,please immediately notify the sender by reply and delete this message and its attachments,if any. From: "Schwartz, Guy L(DOA)" <guy.schwartz@alaska.gov> Date:Tue, 28 Feb 2012 12:19:53-0900 To:Alan Bailey<alanbailey@geothermalresourcegroup.com> Cc: Mary Ohren <maryohren@geothermalresourcegroup.com>,Jonathan Hernandez <Jonathan@geothermalresourcegroup.com>, "Davies, Stephen F(DOA)" <steve.davies@alaska.gov> Subject: RE: Pilgrim Hot Springs Drilling Procedure Alan, The conference call was very informative this morning. Here are some additional detail questions for you guys on draft procedure that was sent. I usually deal with oil/gas rigs so this is a learning process for me. 1) Can you forward me the casing and drilling rod specs please. I don't have these in my standard oilfield handbooks. 2) How does the diverter attach to the 6 5/8" casing ? I saw some comments regarding a compression lock in an earlier email. 3)What is the DSA mentioned in step 18.1 4) Can you run me through the max anticipated surface pressure calculation... Is this from a steam table or calculated from BHT and depth? 5) When the BOP rams are tested is there a test plug installed or is the casing string tested at same time ? Can you give me a detailed procedure for testing assuming pipe rams will be used. Will there be rams for the 2.19" casing too?Are there VBR available to cover the drilling rod as well as casing? 6) What is the min LOT value that you can safely drill ahead with (step 30 )? 7) Do you have a choke manifold setup and piping diagram available. Is choke and kill line piping threaded , welded or knockup ? 8) Do you have to nipple down the BOP before landing and cementing the 2.19" (or 2.36" ?) B-rodcasing? (step 36) That exposes you to well control issues since well is not hydraulically isolated yet. 9) I normally get a cementing detail also for each string. Type cement, sacks , yield , and estimated top of 3/1/2012 Yage 3 of s cement. If some of the questions need clarifying give me a call. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: alanbailey(a geothermalresourcegroua.com [mailto:alanbailey@geothermalresourcegroup.com] Sent: Friday, February 24, 2012 11:29 AM To: Schwartz, Guy L (DOA) Cc: Mary Ohren; Jonathan Hernandez Subject: Pilgrim Hot Springs Drilling Procedure Hello Guy, I've attached the draft procedure. There are still a couple of items to be fleshed out,such as drilling fluids and testing. I look forward to discussing it with you on Monday. Is 10:00 Anchorage time OK for you? Thank you Alan Bailey Manager of Engineering Geothermal Resource Group, Inc. alanbailey@geothermalresourcegroup.com 760-341-0186 Office 760-341-9673 fax 775-304-3253 Cell www.geothermalrecnii rtegroup.com X Untitled The contents of this email message and any attachments are confidential and areintended solely for addressee.The information may also be legally privileged This transmission is sent in trust,for the sole purpose of delivery to theintended recipient.If you have received this transmission in error,any use,reproduction or dissemination of this transmission is strictly prohibited.If you are not the intended recipient,please immediately notify the sender byreply and delete this message and as attachments,if any. 3/1/2012 Notify AOGCC a minimum of 48 hours prior to testing. Examine accumulator using a checklist, ensuring that pressures and volumes are appropriate to the BOPE being tested. Close the wellhead valve and the valves on hlov►wdown side valves. Line up the test pump kill/fillup line side of the wellhead. Bring pressure up to 200 psi,then shut in the manual fill-up side valve. Observe pressure, ensuring that pressure holds to within +/- 5% of test pressure for a minimum of 5 minutes. Open the manual valve on the blowdown side, and observe pressure on the HCR valve, ensuring that pressure holds to within +/- 5% of test pressure for a minimum of 5 minutes. Close the manual valve on the blwodown, open the manual valve on the fill-up side, side, and bring pressure up to 500 psi. Repeat the steps to ensure that the blowdon side and wellhead valve hold pressure. Bleed off pressure and line up test pump with the blowdown side of the wellhead. Open the manual valve on the fill-up side and test the check valve to 200 and 500 psi as the other valves were tested. Make up the bottom hole assembly, RIH and tag the top of the float collar. Fill pipe and circulate the hole. Shut the preventer Line up the test pump on the fill-up side of the well head. Bring pressure up to 200 psi, observe pressure,ensuring that pressure holds to within +/- 5% of test pressure for a minimum of 5 minutes. Repeat the process at 500 psi. Record all tests with an electronic pressure transducer or Barton chart and submit to AOGCC. Easy Leak Off Test Procedure Important: Never Test to Greater Than 1.0psJft! Prior to Testing... Drill out the casing shoe and clean out cement below the shoe. Make 1 to 3 feet of new hole. Spot a high viscosity pill with low water loss and 10 ppb micronized cellulose on bottom. Use a sheet of linear graph paper to plot pressure on the vertical axis versus volume of fluid pumped on the horizontal axis. Don't begin this test without graph paper in hand. During the leak off test,graph the volume pumped versus the corresponding pressure. Use a straight edge to connect data points. Record all liquid pumped. In general in drilling geothermal wells the shoe formations are brittle and weak.Therefore it is necessary to find the leak off pressure without breaking down the formation directly beneath the casing shoe. Let's begin... Fill the stack until pressure begins to register on pressure gauge. In this example, we'll use 50 pounds as our starting pressure. Graph your start pressure: 200 soP"' r�5tart presw`Y • 0 0 .5 Barrels Log your start pressure. After establishing a start pressure,you will begin pumping incremental volumes. All of the volumes will be the same size. In this example, we'll use 1110th of a barrel as our incremental volume. Between each pumping,you will stop and graph the pressure on your graph paper. At first,the pressure vs.volume curve will grow steeper with each pumping: ;11. 200 s a. 100 0 0 .5 Barrels The pressure curve grows steeper with each pumping. This is not what we are looking for. Instead, what we are looking for is a consistent increase in pressure with each pumping. So instead of the pressure vs.volume curve growing steeper, it will appear as a consistent slope—a straight line from point to point: 400 v 0 3� v d H z S 5 N a 200 100 0 0 .5 1 Barrels , The slope becomes consistent. You are now looking for the most important part of the leak off test—you are looking for the slope of the pressure vs. volume slope to become less steep. This is the leak off pressure and the point at which you want to stop pumping fluid: 600 Slope of lint shifts - Don't pump anymore 500 400 300 4 y 3 `O ?00 100 O O .5 1 8arrt l5 The slope has shifted. You can see on the example graph that the leak off occurred at the 8th fluid increment or 490 psi. car — Leak 400 Off por M ,c ti D 5 1 •ea ree, Leak off! After reaching leak off pressure, the pressure curve should fall off: 500 Ct^e pressu'E 400 � m 3 300 200 100 0 1 Barrels • The pressure falls off after reaching leak off pressure Sometimes the curve doesn't fall off as neatly as in the illustration above and you have to pump an extra increment or two. The leak off still is the point at which the pressure vs.volume curve peaked boa - i5y Ore-`Y 1•-tea�C(i M i- so0 400 1 0i -Z300 3 zoo 0 l3arrels x Had to pump a little extra toget it to roll over. Now it's time to do our calculations. In order to determine the fracture gradient, we must know the following: • True Vertical Depth of the well • Weight in pounds per gallon of the fluid in the wellbore • Leak off pressure. Using this information,we will calculate the fracture gradient using the following formulas: Hydrostatic Pressure=Weight of Fluid in Wellbore (ppg)X 0.052 X TVD Fracture Gradient=(Hydrostatic Pressure of the Fluid +Leak Off Pressure)/True Vertical Depth Equivalent Mud Weight= (Fracture Gradient/0.433)X 8.33 For the sake of this example, we'll use 2000' as the TVD and 9.0 ppg as the weight of the fluid. We have already determined the leak off pressure as being 490 psi. Here are the results of this simulation: Hydrostatic Pressure =9.0 X 0.052 X 2000= 936 psi Fracture Gradient= (936 psi +490 psi)/2000 ft=0.71 psi/ft Equivalent Mud Weight=(0.71/0.433)X 8.33 = 13.66 ppg Schwartz, Guy L (DOA) From: Markus Mager[markus.mager@alaska.edu] Sent: Thursday, February 23, 2012 10:49 AM To: Schwartz, Guy L (DOA); Davies, Stephen F (DOA) Cc: Alan Bailey; Bill Rickard Subject: Pilgrim Hot Springs Project Hello Guy and Stephen, We are moving forward with our project at Pilgrim Hot Springs. ACEP contracted with Geothermal Resource Group (GRG) to help us with well design and permitting to meet AOGCC requirements. GRG has extensive experience in Alaska (e.g. Akutan) and working with AOGCC. Alan Bailey (cc'd) is GRG's main project lead on Pilgrim and will probably contact you soon regarding our 2012 drilling application. The list below provides contact information and I'm looking forward to a good cooperation between AOGCC, GRG and ACEP. Alan Bailey Manager of Engineering 760-341-0186 Office 760-341-9673 Fax 775-304-3253 Cell Steve Davies Sr. Petroleum Geologist Steve's phone: 907-793-1224 AOGCC's receptionist: 907-793-1223 AOGCC's fax: 907-276-7542 AOGCC's website: http://doa.alaska.gov/ogc Guy Schwartz Senior Petroleum Engineer 793-1226 (office) 444-3433 (cell) Thanks you, Markus Markus Mager Energy Analyst Alaska Center for Energy and Power University of Alaska Physical Address: 407 Bunnell Bldg Mailing Address: PO Box 755910 Fairbanks AK 99775-5880 Phone (907) 474-1143 Fax (907) 474-5475 http://acep.alaska.edu/ http://energy-alaska.wikidot.com/ http: //www.akenergynetwork.com/ 1 f Schwartz, Guy L (DOA) From: Markus Mager[markus.mager@alaska.edu] Sent: Thursday, December 22, 2011 1:04 PM To: Maunder, Thomas E (DOA) Subject: Re: Geothermal permitting meeting next week in Anchorage Hello Tom, thanks for your email. I know the meeting was kind of last minute but I thought to let you know anyways. The meeting went well and I think DNR, AEA and ACEP now have a better understanding on how the "geothermal dots" connect in the State and what permitting and regulatory needs there are. I'm sure it was not the last dialog between the agencies and hopefully you can join us the next time. Here is the short version of the 2011 wells: They are basically holes that have a pipe in them and we measured temperature. We got some core and bag samples. Here is the long story: We started TG hole drilling in the beginning of August and continue through the middle of September. We selected S9 as our first drill site. We decided to drill the second TG hole at S1 based on the characteristics of S9. Before drilling commenced, we walked to the drill location with members of the MINC Board of Directors (President Carlson Tingook, Vice President Richard Komok, and Dora Hughs) as well as Larry Pederson from BSNC to review the mobilization and drilling plan. We used a USGS-owned Atlas Copco CS-1000-P6L drilling rig to drill the two TG holes. The holes were cased with 6-in diameter steel conductor casing to a depth of approximately 33 ft. We failed to continuously core to a depth of 500ft in S9 due to the encountered soil conditions (disaggregated gravel, silt and sand) . We switched to rotary drilling and finished S9. S1 was drilled entirely using rotary drilling due to the expectation that we would encounter the same disaggregated subsurface materials. However, we bagged samples from both holes at regular intervals. A non-screened 2 inch casing was set from total depth to land surface and grouted into place. The casing was filled with water and used to measure subsurface temperatures with a thermal gauge. Both holes will be decommissioned (plugged and abandoned) at the end of the 2012 field season. Water from the Pilgrim River was used as drilling fluid at both sites. If well conditions required, we mixed a bentonite slurry consisting of Quik-Gel (Baroid Industries — NSF certified) , and river water. A natural cellulosic polymer (Quik-Trol, Baroid Industries — NSF certified) was added to the slurry to improve borehole stability or circulation conditions if necessary. Upon reaching land surface, drilling fluid and cuttings flowed from the well bore to a dug sump. The mixture was pumped from the sump over a set of shaker screens, through desanding cones, and into a shaker tank. The solids, removed at the screens and cones, were deposited through a chute and into an above-ground tank. The fluid, cleaned of solids, was re-circulated from the shaker tank down the borehole. So basically just like your standard mineral exploration hole with an additional pipe in them. Let's re-connect next year and we can talk details. I will be back in Fairbanks on January 5th and will give you a call in early January. Best regards and Happy Holidays, Markus 1 On Fri, Dec 16, 2011 at 8:38 AM, Maunder, Thomas E (DOA) <tom.maunder@alaska.gov> wrote: > Markus, > I must apologize for not getting back to you. The Commission is in the midst of an office remodel and "things" are very hectic. How did the meeting go? I look forward to staying in touch as your project advances. > Although AOGCC permits were not needed for your most recent work, is it possible to see some summaries or actual well reports about the work that was accomplished? Is the material in the public domain? > Regards, > Tom Maunder, PE > AOGCC > Original Message > From: Markus Mager [mailto:markus.mager@alaska.edu] > Sent: Friday, December 09, 2011 4:44 PM > To: Maunder, Thomas E (DOA) > Subject: Fwd: Geothermal permitting meeting next week in Anchorage > Hello Tom, > I just left you a voice message. I think it would be great if you > could join us for a geothermal permitting meeting next week in > Anchorage (see email below) . I will send you the detailed information > (time, place) as soon as I have them. I hope you can make it, thanks, > Markus > Forwarded message > From: Markus Mager <markus.mager@alaska.edu> > Date: Fri, Dec 9, 2011 at 4: 11 PM > Subject: Geothermal permitting meeting next week in Anchorage > To: Peter Crimp <PCrimp@aidea.org> > Cc: David Lockard <dlockard@aidea.org>, tom.crafford@alaska.gov, Gwen > Holdmann <gwen.holdmann@alaska.edu> > Hello Peter, > it was good to talk to you today. > DNR's Office of Project Management and Permitting contacted me several > weeks ago regarding permitting, especially geothermal. Tom Crafford > from DNR just called me and offered to fly up to FAI next week to > discuss permitting since he is finalizing a white paper on the topic. > I contacted you today since I want to make sure that AEA stays in the > loop as well. Barbara initiated a state wide discussion on how to > streamline geothermal permitting, which included several meetings of > the geothermal working group with different stakeholders and > permitting agencies. The state wide discussion ended since her bad > accident. I think it is important to keep the discussion alive and I > was wondering if someone from AEA wants to join us for that meeting. > If so, I would be willing to fly down for a day and we all could meet > in Anchorage (under the assumption that Gwen will sign my TA, which I > anticipate) . > Based on Tom's and my schedule I suggest Tuesday the 13th, sometimes > after 10am at AEA. Alternatively we could meet at DNR. What do you > think? > Thank you, Markus > > > -- 2 Markus Mager Energy Analyst Alaska Center for Energy and Power University of Alaska Physical Address: 814 Alumni Drive Mailing Address: PO Box 755910 Fairbanks AK 99775-5910 Phone (907) 474-1143 Fax (907) 474-5475 http: //acep.alaska.edu/ http: //www.energy-alaska.com/ http: //www.akenergynetwork.com/ Markus Mager Energy Analyst Alaska Center for Energy and Power University of Alaska Physical Address: 407 Bunnell Bldg Mailing Address: PO Box 755910 Fairbanks AK 99775-5880 Phone (907) 474-1143 Fax (907) 474-5475 http://acep.alaska.edu/ http: //energy-alaska.wikidot.com/ http: //www.akenergynetwork.com/ 2 > Markus Mager > Energy Analyst > Alaska Center for Energy and Power > University of Alaska > Physical Address: 407 Bunnell Bldg > Mailing Address: PO Box 755910 > Fairbanks AK 99775-5880 > Phone (907) 474-1143 > Fax (907) 474-5475 > http: //acep.alaska.edu/ > http: //energy-alaska.wikidot.com/ > http://www.akenergynetwork.com/ > -- > Markus Mager > Energy Analyst > Alaska Center for Energy and Power > University of Alaska > Physical Address: 407 Bunnell Bldg > Mailing Address: PO Box 755910 > Fairbanks AK 99775-5880 > Phone (907) 474-1143 > Fax (907) 474-5475 > http://acep.alaska.edu/ > http://energy-alaska.wikidot.com/ > http://www.akenergynetwork.com/ Markus Mager Energy Analyst Alaska Center for Energy and Power University of Alaska Physical Address: 407 Bunnell Bldg Mailing Address: PO Box 755910 Fairbanks AK 99775-5880 Phone (907) 474-1143 Fax (907) 474-5475 http://acep.alaska.edu/ http: //energy-alaska.wikidot.com/ http://www.akenergynetwork.com/ 3 Schwartz, Guy L (DOA) From: Markus Mager[markus.mager@alaska.edu] Sent: Thursday, December 08, 2011 10:09 AM To: Maunder, Thomas E (DOA) Subject: TG holes Pilgrim Hot Springs FYI. . . Forwarded message From: Aubert, Winton G (DOA) <winton.aubert@alaska.gov> Date: Thu, Oct 21, 2010 at 3:08 PM Subject: RE: TG holes Pilgrim Hot Springs To: Markus Mager <markus.mager@alaska.edu> Cc: "Seamount, Dan T (DOA) " <dan.seamount@alaska.gov>, "Norman, John K (DOA) " <john.norman@alaska.gov>, "Foerster, Catherine P (DOA) " <cathy. foerster@alaska.gov> Markus, Thank you for the information on your Pilgrim Hot Springs 2011 drilling program. The Commission understands that the expected bottom hole temperature in your proposed drilling area is in the range of 85 degrees C to 93 degrees C. Based upon this expected temperature, the Commission will not assert jurisdiction at this time, and no Commission permits are necessary for your drilling program. However, should you encounter temperatures that vary significantly from that expected, please contact the Commission at that time for further discussion. Thank you, Winton Aubert AOGCC 907 793-1231 Original Message From: Markus Mager [mailto:markus.mager@alaska.edu] Sent: Thursday, October 21, 2010 11:06 AM To: Aubert, Winton G (DOA) Subject: TG holes Pilgrim Hot Springs Winton, I got your phone message, thanks for the quick response. Here are some information: - we identified the area where we might drill (see attached map) - Task description: Task 3.1 Gradient Hole Drilling Program (planed for 2011 field season) A minimum of two TG holes will be permitted and drilled to an estimated depth of 500 ft to test the conceptual model and further refine the location for the two deeper confirmation holes. These holes will be completed with 1 ;1" iron pipe so that low temperature Kuster gauges can be run inside the iron pipes. Holes which encounter liquid water will be sampled for chemical analysis. Let me know if you need more information, Thanks, Markus 1 \/-1-\ ir;\ _=ASEA SEAN PARNELL,GOVERNOR E. ALASKA OIL AND GAS 333 W 7th AVENUE,SUITE 100 CONSERVATION CO11II►1<ISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 September 8, 2010 Ms. Gwen Holdmann, Director Alaska Center for Energy and Power E-mailed and sent by U. S. Mail University of Alaska PO Box 755910 Fairbanks AK 99775-591( Dear Ms. Holdmann: The Alaska Oil and Gas Conservation Commission (Commission) has reviewed your August 19, 2010 correspondence to Winton Aubert. Based upon information previously provided and the contents of your correspondence, the Commission understands that 1) the temperature of the geothermal resources at Pilgrim does not exceed 120 Celsius, and 2) the re-entering of the wells is being undertaken solely for the purposes of research, i e., to test the validity of an innovative geothermal exploration technique. As a result of these representations, the Commission will not exercise its jurisdiction at this time. The Commission's decision is based solely on the representations provided to it. Should the geothermal resources be used for any purposes other than the gathering of information, the Commission reserves the right to revisit the issue of its jurisdiction. In addition to the above, your correspondence also indicates your intention to drill "two 500ft gradient holes and two 2500ft confirmation holes ..." Any such holes would fit the Commission's regulatory definition of"welI." Consequently, prior to drilling any such �! holes you will need to recontact the Commission to ascertain whether a permit will be required. If you have any questions, please feel free to contact Mr. Aubert. - =ly ` T . onnan .m -loner OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME /z - PTD# Z ( 2 2z( Development Service Exploratory Stratigraphic Test Non-Conventional Well /a FIELD: ( r �'(� i yl� J��i'1 'S POOL: L/ 1 C�—Z [ Cc� Tl� rvu Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well_ SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in / SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 f ❑❑ (6 to co 0 1) N a O to to _ N Q . o, 0, 1. Q a) a p, u) O 3. ° w Q a El_) ca' o' 0 = of ' Oa) >, -o a E O 0 CO, N' aD a r, • ^ (a m, E' t' Tom- `O) = a) .TD CO0 N� ' 0' L' ' ' ' ' to. 2 3 •e or ' , 0' a)' 0 v =' u% a� `f0t' m' E c' 3' o _ a) a , , o c5 1° •g, to ^ -° -p 0) to' .co. co, N > m 8' o: € _o 2 Q 'N' (o E •h O. O' •c• D1 a 3 c N O 0-) ci o f 15 -0 o 0 m co.01 (0 m 4 O, 7 � o c� rn • N' E T C (0' • o 01 a) y' N' ° a rn 0. C o m a ~° § E -)' �' bo ° o a j v 3 N , 0' O' 0' 30. V U. co p' a5 N a N, °. in c • a (n' CM �' • 0 C O C' f0 a n' c. 1 aj N (n O (0 (/) O a) O 2. co.. y to x a) L 1 O m a� o c V a V 3. `m R C p, 3 c O o a> C C O L l6 a) to N, > M () O c t--- 0- O (n, U a°� • 3 3 a�co 7' m o', w o 'v CO .0 a) 'o' p' �' o w • co �' �, N. p. to 3 Oc o a "°O o, L m o. m. N�' � _� 0, C� � `. o w Z a) a c° co' 3 a) c, o w '3 3 o to n E.. 112 o c r, cn, '5 ' (o' 0 (d 3' r, N, 0 M b a1) Q Z• V' Vci, 1 m' c' 0) 3 tT t Eis , C, co O a) �� a •C� y O' p� m C ai 3 • — o, m e o m a a aci' E o o c m N x a`� to V' m m O c to 3' 0 E a°i o, w {� t o �? II c� o m _, o Z � m' � E a' -' t U c, � L' �� 'VC� T U, _ a C a N' c. t' C' d N Q a) 'c' 7 O r C• � M' O' ,t _ L' -a\0� .0. Cr) N' 2' (/)' O' C a)' N • Z N' �? y 0' a) a) 0 O' N' T 0— C > N. 0' < 0-' 0 N 0 3' c6 Lu a' 'a' >' a' O > m' O' m' 5 Z 0 rn' 2 ¢ 2 Z rwz 0 E a cu Q Q a), o,, o,, N, aa)), o co, a`)), N, CO, a), aa)), Q, Q, Q, a) N, a> 0, Q, N, a> Q. a aai, a), a`),), aa'), Q: a 0 Q N, aa)), Q, Q, N.. a Z, Z, >, > Z, > >, > > >, >, >, > > Z, Z, Z, >-: > > Z, Z >, > Z > >, > > > z >. z z >- > Z, Z >- a c. co :? N. to v, >, Q ca 0 Y, c To , E E 3 - E: a) , O C) C I N qk to O o d U"r) v, a .N c E _ p, C, , , , 3 3 v . 0 a, • , N C �, o a�� ° a `°� °� " lel 7 ' O T .ay C 7. O, y. a7. pp� C� 'O to p1 (0 to V �' U' �, O to @� �, •y, CO, w N. C' p Q ,� a) 3 't € _ a > 4 IVbhl M � � 0) ,, .0 p > 3' �O j, V N, N a O y � 3 03,� 0, > -0� N' ' 0 ' a'' ' as E a) a - O 7 O � C� t O `� COZ� y� 0 7� 3� a) � co� C� O -c� c 0' =� O o� 1p c Q to to N' N .. V' O c -0 � 0 a) 'C 7' (a' N a � Q, 00 c a) m' � o' N O 1 .0 > c: > V. 4 a) y tn, c O O co 0 M' E, E = v c c E f6 a) o c' c 7, H c o 0 : w c m w_ a) Ci N s 0 c m' c to o 4 Q Q' 0 w w C 0 -° 0 m o 0 o api 0 v, U' 'a ° ' 4' is a ° 3 8 > Y `m'� 2', ' 4:' p' °' a)' c o, 7 C „' 'O 0, - O' O, y (0. o E .2 2, Q� �, _ N >, O. 0) 0 N' C to toco„ E o' -' c) d r a o' o' a) c' N _ m. 0 o Z o . E E 7' 3' a)' o -cm' 3' (3' . J € 10, C, w, Ls, N. a G O L, :' •-0, CO 0,, -o, N N 2 c, C N. 0 M 10 .N L C 0 0 t1. 3 j O' .0 �' 3' C E O Q O. .c a) N. N. @ . .. • . m. �, N. .., V N U N, 3. co a) O D. N 0 . 4 �' co Q 1 3, ai (0 a) O; W ° O ,� O: V' C' (6' N V. > '> 0 O 0' v 0 o O a O. C' p' p L U d u_ cc, V, a m a> v, v, > p m o ami ami p m E' o 0 o g o Y g c o ° 73 E 0° a) E' L �) g ate) a to ' c o$ O8 p °` O, 3' a> a a> N `,O0'' t]. to. o' cc a c �: 15 d a `o O) a)) _ V o ' E •O @ E, O 8 • N, :+ a' 0 N O to cLi, m, E. o, o, a w, 0, m, �' •c rn a m m m; m rn m o' m m >, c 3 2 0 CO to o .....-CO. F' f0 (0 l6 c to ,.. (6 ` to 3' or y' ,0°) V) _� O N f0 �' c -0° 'V) -- I (n Of 0 C V V V U .N C N' a.. -, a: -O L, o I N, g e >, G? t N 0 n "c y� 2 V O °U Q. C -0 N WN' aY E' a) O � w (6 -0 O .0 c c a) •'3. 0 a> N- C, o UN). 3 "O '°O, G m, 0 0. m C: a), c 0 N >. a) 7. (d �p « t6 N m -0,.; �, U _ a) c. 0 @ 0. p, 0, c, > c w C U U O @ O O. O O „, U co, O U. N. O. O ', OE(0. V f6 y Q. E •3 0 E O N V V V, V) Z o a�, o o, _a. �, g m m, E a ° a�, a �, > > 3 o a�, o ° °) w. W Y (0 °- E, > co >, o a�, a) .c E .�' �' ., v, a a a) aa)), m, m 3. ._, C. =, 2. 2 2 m v 0 v 'v = O O .c o' °- aa)) a� m, a, a`i), o, o V c Z a, � D 5 3, 3; co, , o, o, a a, U, ¢; a; o co U U o U Q w ¢ o CO CO. u ° 2 'a Q, co co v, W t1 f� N M a O <O h OD 0) O N (+) V 1° (0 N 0) O N NN M V LCI () N N. N N OM M tN tM M fO r b O coMMM _ U N N N ch R 0 O N O N U p i p c c rt t9 O Q N p N Q N 0)'y N N 0) N N O to Om N `E O M o• E J N w y a O E J I c .5 0 ° `0. a G to a D 0 ,W.j. a E Q w Q. 0 CD 0 Q c`ln