Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
185-165
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, August 22, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Brian Bixby P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. 3J-04 KUPARUK RIV UNIT 3J-04 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 08/22/2024 3J-04 50-029-21400-00-00 185-165-0 W SPT 5990 1851650 1500 2925 2925 2925 2925 20 20 20 20 4YRTST P Brian Bixby 7/9/2024 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:KUPARUK RIV UNIT 3J-04 Inspection Date: Tubing OA Packer Depth 330 1910 1810 1785IA 45 Min 60 Min Rel Insp Num: Insp Num:mitBDB240710102713 BBL Pumped:2.2 BBL Returned:1.8 Thursday, August 22, 2024 Page 1 of 1 MEMORANDUM TO: Jim Regg P.I. Supervisor l�Z�Z3I- FROM: Adam Earl Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, July 8, 2020 - SUBJECT: Mechanical Integrity Tests ConowPhillips Alaska, Inc. 3J-04 KUPARUK RIV UMT 31-04 Sre: Inspector Reviewed By:�j P.I. Supry Comm Well Name KUPARUK RIV UNIT 3J-04 API Well Number 50-029-21400-00-00 Inspector Name: Adam Earl Permit Number: 185-165-0 Inspection Date: 7/2/2020 Insp Num: mitAGE200703090201 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min 3J 04 Type Inj w TVD 8990 Tubing vao n8o - z so - n8o- JWell PTD 1851650 " Type Test SPT Test psi 1500 IA OA 390 2000 1900 " 1880 " BBL Pumped: z 3 _ BBL Returned: 2.3 zoo - 400. 400_ 400 interval arnrsT P/F P Notes: MIT IA Wednesday, July 8, 2020 Page I of I • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: Wednesday,July 06,2016 P.I.Supervisor `( 7I1 3'i 4 SUBJECT: Mechanical Integrity Tests l CONOCOPHILLIPS ALASKA INC 3J-04 FROM: Chuck Scheve KUPARUK RIV UNIT 33-04 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name KUPARUK RIV UNIT 3J-04 API Well Number 50-029-21400-00-00 Inspector Name: Chuck Scheve Permit Number: 185-165-0 Inspection Date: 7/5/2016 Insp Num: mitCS160705154311 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Wel 3J-04 Type Inj W TVD 5990 ' Tubing 2775 2850 • 2810 - 2810 - PTD 1851650 ' Type Test SPT Test psi 1500 - IA 380 1950 - 1900 - 1890 Interval 4YRTST P/F P ✓ OA 220 380 380 380 - Notes: scANNED NOV 2 22010 Wednesday,July 06,2016 Page 1 of 1 r iS l Cv b ct :'iovec • 2'1 0V'7 WPR 0 5 Z' `,i WELL LOG TRANSMITTAL#903064999 To: Alaska Oil and Gas Conservation Comm. April 1, 2016 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 DATA LOGGED Anchorage, Alaska 99501 -4i BENDCD S RE: Injection Profile : 3J-04 SCANNED Run Date: 1/19/2016 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 3.1-04 Digital Data in LAS format, Digital Log Image file, Interpretation Report 1 CD Rom 50-029-21400-00 Injection Profile Log 1 Color Log 50-029-21400-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: / ' ✓�� �✓ - / ..e:+ft • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg � DATE: Wednesday,July 29,2015 P.I.Supervisor n Ci�1'311 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 3J-04 FROM: John Crisp KUPARUK RIV UNIT 3J-04 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry 576E— NON-CONFIDENTIAL Comm Well Name KUPARUK RIV UNIT 3J-04 API Well Number 50-029-21400-00-00 Inspector Name: John Crisp Permit Number: 185-165-0 Inspection Date: 7/23/2015 Insp Num: mitJCr150729120531 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 33-04 " Type Inj W' TVD 5990 Tubing 2800 • 2800 - 2800 - 2800 - PTD I 1851650 • Type Test SPT;Test psi 1500 - IA 920 1800 , 1750 - 1740 Interval 4YRTST PAF 1 P '/ OA 480 530 . 530 530 - Notes: 1.2 bbls pumped for test. SCANNED ;F Wednesday,July 29,2015 Page 1 of 1 ConocoPhillips P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 March 31, 2010 Mr. Dan Seamount Alaska Oil & Gas Commission 333 West 7~' Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Dan Searriount: R~C~IVED APR 0 5;' -2010 ~~aska Qfl ~ Gas Cons. Carnmia~ian agI:~10f~~ 85-165' 33- 04 ;-, Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRLn. Each of these wells was found to have a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The cement was pumped March 2 and 21, 2010. The corrosion inhibitor/sealant was pumped March 27, 28 and 29, 2010. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call MJ Loveland or Perry Klein at 907-659-7043, if you have any questions. Sincerely, MJ L veland ConocoPhillips Well Integrity Projects Supervisor ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Kuparuk Field Date 3/31/10 3A. 3B. 3C. 3G. 3H. 31. 3J. 3M. 30 ~ 3R PAD~s Well Name API # PTD # Initial top o cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbis ft al 3A-02 50029214310000 1852050 Surface n/a 26" n/a 4.25 3/29/2010 3A-04 50029214330000 1852070 SF n/a 26" n/a 4.25 3/29/2010 3A-07 50029214440000 1852230 SF n/a 25" Na 4.25 3/29/2010 3A-16 50029214920000 1852840 SF n/a 23" n/a 3.4 3/29/2010 36-10 50029213660000 1851140 6'6" Na 6'6" n/a 25.5 3/28/2010 3C-11 50029213570000 1851020 SF n/a 25" Na 4.25 3/27/2010 3G-08 50103201280000 1900650 SF 0.65 27" 3/2/10 5.52 3/28/2010 3G-09 50103201290000 1900670 SF 0.60 22" 3/2/10 4.67 3/28/2010 3G-22 50103201470000 1901420 SF n/a 22" n/a 4.25 3/28/2010 3H-01 50103200840000 1871100 SF Na 21" n/a 4.25 3/28/2010 3H-03 50103200850000 1871110 17" 0.40 8" 3/21/10 1.7 3/28/2010 3H-14B 50103200920200 2050210 SF n/a 23" Na 3.4 3/29/2010 31-02 50029215150000 1853080 SF n/a 22" n/a 2.97 3/29/2010 31-10 50029219340000 1890370 39' 3.50 24" 3/21/10 3.4 3/29/2010 3J-04 50029214000000 1851650 SF Na 23" Na 3.4 3/28J2010 3J-14 50029214960000 1852880 SF n/a 25" n/a 4.67 3/28/2010 3J-15 50029214970000 1852890 SF Na 22" n/a 3.4 3/28/2010 3M-05 50029217060000 1870250 SF Na 21" n/a 3.4 3/29/2010 3M-07 50029217080000 1870270 SF n/a 22" n/a 4.25 3/29/2010 30-09 50029218250000 1880610 SF n/a 23" n/a 4.25 3/27/2010 30-16A 50029217960100 1880430 SF n/a 22" Na 3.52 3/27/2010 3R-10A 50029222530100 1920310 SF n/a 21" n/a 4.25 3/27/2010 3R-11 D 50029222480000 1920160 SF n/a 17" n/a 3.25 3/27/2010 3R-15 50029222580000 1920340 SF n/a 24" n/a 3.82 3/27/2010 3R-19 50029222690000 1920460 1" Na 21" n/a 5.1 3/27/2010 3R-25 50029226220000 1951810 SF n/a 21" n/a 5.52 3!27/2010 WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. Attn.: Christine Mahnlcen 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Injection Profile: 3J-04 Run Date: 10/16/2009 • November 9, 2009 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention o£ Rafael Barreto, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 3J-04 Digital Data in LAS format, Digital Log Image file, Interpretation Report 1 CD Rom 50-029-21400-00 Injection Profile Log ~w~~~ kJ~l~ ~ ~ Z0~6C 1 Color Log ~0-029-21400-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Rafael Barreto 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-335 rafael.barreto@halliburton.coin i ~~ ~~G3/ Date: Signed: WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. November 4, 2009 Attn.: Christine Mahnken 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Perforation Record: 3J -04 Run Date: 9/1/2009 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rafael Barreto, Halliburton Wireline Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 3J -04 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50- 029 21400 -00 NO `A 2000 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline Perforating Attn: Rafael Barreto 6900 Arctic Blvd. 1 S /ep Anchorage, Alaska 99518 Office: 907 273 -3527 Fax: 907 273 -353 rafael.barreto tbaikra.gitir Date: c�cr? aFss Signed: wAd 011 Gas Ccos , ~ ~-~ "~7~- ~,: ~ ~ ~ ~~9-~~09 • STATE OF ALASKA • ~`?~,rt ALASKA OIL AND GAS CONSERVATION COMMISSION - ~;~` REPORT OF SUNDRY WELL OPERATIONS ,~ ~, ,~.n.,..~~ 1. Operations Performed: Abandon ^ Repair Well ^ Plug Perforations ~ Stimulate ^ Other ' Q, Alter Casing ^ Pull Tubing ^ Perforate New Pooi ~ Waiver ^ Time Extension ^ Change Approved Program ^ Operat. Shutdown^ Perforate ~_ Re-enter Suspended Well ^ 2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number: COr1oCOPhillips Alaska, InC. Development ^ Exploratory ~ 185-165 /' 3. Address: Strati ra hic g p ^ Service ~ ^- 6. API Number: P. O. Box 100360, Anchora e, Alaska 99510 50-029-2'1400-00- 7. KB Elevation (ft): 9. Well Name and Number: RKB 81' ~ 3J-04 - 8. Property Designation: 10. Field/Pool(s): ADL 25630 - Kuparuk River Field / Kuparuk River Oil Pool 11. Present Well Condition Summary: Total Depth measured 8544' ~ feet true vertical 6538' , feet Plugs (measured) Effective Depth measured 8437' feet Junk (measured} true vertical 6458' feet Casing Length Size MD ND Burst Collapse Structurai CONDUCTOR 111' 16" 111' 111' SURFACE 4216' 9-5/8" 4297' 3413' PRODUCTION 8445' 7" 8526' 6525' . .;.,..~.«,.,. .~... ~ f / Perforation depth: Measured depth: 7910'-7925', 7950'-7960', 7966'-7984', 8012'-8016', 8115'-8155', 8174'-8214' true verticai depth: 6067'-6078', 6097'-6105', 6109'-6123', 6143'-6146', 6222'-6252', 6266'-6296' Tubing (size grade and measured de th) p~; '( ~ ; ~s ~~ ~UUJ 2 875" 7881' MD ~~ ~b~~~ ~"`` J 55 , , p . , . - , $~ ~~~~ y ~ ~ Packers & SSSV (type 8~ measured depth) Camco HRP-t-SP pkr @7soa~ Camco TRDP-1A-SSA SSSV @ 1818' 12. Stimulation or cement squeeze summary: Intervals treated (measured) not applicable Treatment descriptions including volumes used and finai pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation 1922 -- Subsequent to operation 239g - 14. Attachments 15. Well Class after work: Copies of Logs and Surveys run _ Exploratory ^ Development ^ Service ^~ " Daily Report of Well Operations _X 16. We11 Status after work: _ Oil^ Gas ^ WAG ^ GINJ ^ WINJ Q WDSPL ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: none contact ,1ohn Peirce @ 26 5-6471 Printed Name John Peirce Title Wefls Engineer Signature ,,~ ~ Phone: 265-6471 Date ~-~""1--~j 1 ~ ~'y, ? Pre red b Sharon All Drake 263-4612 ~ ,, > o,~.. .]."_~r Form 10-404 Revised 04l2006 $~~°~~"~~~ ~~~, ~" ;~ s;~~14 Submit Original Only . ~~~ 3J-04 Well Events Summary DATE SUMMARY 8/11/09 GAUGED TBG TO 2.26" TO D N E@ 7847' RKB. DRIFTED TBG WITH ~" CENT. 2.125" STEM AND 2.23" CENT (OAL=221") TO 8240' SLM, EST. 52' RATHOLE. READY FOR PERFS. 9/1/09 COMPLETED PERFORATIONS ON 3J-04. CORRELATED TO SCHLUMBERGER CEMENT EVALUATION LOG DATED 10-5-1985. PERFORATED C4 SAND ~ 7910'-7925'. C3 SAND 7950' - 7960' AND A5/A4 SANDS ~ 8115' - 8135'. ALL GUNS WERE 2" MILLENIUM 6 SPF HMX DP 60 DEG PHASING ~ ConocoF~hiilips A.~~~ISr.,i 41C. ... _ "WBIIGong,'3J. .,918/20G , . _. Stl~OmatiC-A 1~ ~ ,«r,.,~~ f ooNOUC,oa. 4 n; snFE~v v~v. _ 1.818 GAS LIFf, _ 2.fi35 . SURFACE, <.P91 GAS LIFT. GAS LIFT, 6,006 GAS LIFT. 6.663 GASLIFT. .._ . - ~ oaz GAS LIFT, 1.39t GAS LIFl. 7.7~2 SBR,7,791 PACKER.7.806 NIPPLE.].Ba7 sas. ~.seo - - TTL.7.881 APERF,_ ~ ].910.I.925 MERF, 7.966-7.986 - ._. APERF, 8.012-8.016- --- MERF, 8.115-8,135~ IPERF. 8.'.3] IPERF, B.'4t IPERF,8,166 ~ APERF, 8.134~8,155 IPERf, 8,166 -~ -- IPERF, 8,151 - IPERF, ____~ s,na-e,2ia PRODUCTION. 8,526 ~ TD.8.5M '-- KUP IboraAPUUWI FieltlNama 500292140000 KUPARUN ment IH 3V~. Flapper Locketl Out ~ otation IDapt~~ftK6) IEr tTao:SLM 8240.0 £ 3J-04 'd (tt~ II Rig Release Date 40.19 9/18/1985 lod By II End Date nosbor 9/62009 Stri~g OD String ID Sat Depth Set Depth (ND) String Wt String scription (~~) (~n) Top(ftKB~ (ftKB) (itKB) (Ibs/N~ Grade StringTopThrd TOR 16 15 062 0.0 117.0 117.0 62.50 H-00 = 9 5/8 SJ65 0.0 4,297 0 3,412.9I 36.00 J-55 710N 7 _ .. 6.151 0.0 . _ . _ . 8,526.0 _ .. 6,524.8', 26.OOiJSS I . . . ._. .__ . .. . - ID ~ ~ Set Dapth ~ Set Dapth (ND) J.791 7.808 7.847 7 880 ITMPD/1/DMY/BK-2ll/ CommeN~ STA 3 iTMPD/1/DMY/BK-2/l/ Comment STA 4 /TMPD/1/DMY/BK-2/// Comment STA 5 /T~MPD/1NMY/BK-2/// Comment STA 6 /TGPD/1.S/DMYlTGI// Comment: STA 7 70' stroke SBR 'HRP-I-SP' PACKER 'D' Nipple NO GO Perforatio '~ ns & Slots i i snal . i._ .... .. . ..... .. _ .._ ~ Top (TVD~ Btm (TVD) Dens Top (flK6) I Btrn ~ (flK8) (fiKB) (HKB) 2one Date (s~... 7ypa I Comment 7,910 7,925 6,066.8 6 078.1 C-0, 3J-04 9/1I2009 6.0 APERF 2" Millenium DP, 60 tleg phase 7,950 7,960 6,097.1 6,104J'C-3, 3J-04 9l1/2009 i 6 0 APERF I2" Millenium DP. 60 deg phase 7,966 7,984 6,1092 6,122.8 C-1, UNIT B, 3/7l1988 I 8.0 APERF ~~2 1/8" EnerJet 60 deg. phasing 3J-04 i 8,012 8,076 6,143.3 6,746.4 A-3, 3J-04 3/7/1988 'I B.OI APERF 2 118" EneWet, 60 tleg. ph 8,115 8,135 6,222 0 6,23~.1 A-5, A-4, 3J-04 i 9/1/2009 ~' 6.OII APERF 2" Millenium DP, 60 tleg phase 8,134 8,155 6,2363 6,252.1 A-3, 3J-04 I 3/7/1988 I 4.O~ APERF 2 1/8" EnerJet, 0 deg. ph 8,137 8.137 6,238.6 6,238.6~A-3, 3J-04 1220/1985I 1.01 1PERF 4" HJ II Csg Gun, 90 deg. ph 8,141 8,141 6,241.6 6,241 6 A-3, 3J-04 I 12/20I7985 1.O~ IPERF 4" HJ II Csg Guq 90 tleg. ph 8,144 8,144 6,243.8 6,243.8 A3, 3J-04 12/20/1985 1.0 IPERF 90 deg_ phasing 8,146 8,146 6,245.3 6,245.3 A-3, 3J-04 12/20/1985 1.0 IPERF 90 tleg. phasing 8.151 8.151 6.249.1 6.249.1 A-3. 3J-04 12/20/1985 1.0 IPERF 4" HJ II Csg Gun, 90 deg. ph 1dIEM®1~1~1DiJM • TOE Jim Regg P.I. Supervisor ~ ~~~ d~'(~ ~ (J~ FROM: Bob Noble Petroleum Inspector State off Alaska . Alaska Oil and Gas Conservation Commission DATE: Tuesday, July 08, 2008 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 3J-04 KUPARUK RIV UNIT 3J-04 Src: Inspector NON-CONFIDENTIAL Reviewed Bye P.I. Suprv ~,J L~~-- Comm Well Name: KUPARUK RN UNIT 3J-04 Insp Num: mitRCN080708060940 Rel Insp Num: API Well Number: 50-029-21400-00-00 Permit Number: 185-165-0 Inspector Name: Bob Noble Inspection Date: ~/6/2ooa Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well ~ 3J-04 jType Inj. ~' TVD s99o IA I lzoo z3oo zzzo ~ zzoo p T i 1851650 ~TypeTCSt SPT Test psi 2300 OA 550 ~ 670 670 ~ 670 Interval aYRTST p~F P ./ Tubing zsao ~ zsao zsao zsao Notes: c7~cs~ AU G ~ ~ 208 Tuesday, July 08, 2008 Page I of 1 02/16/07 Schlumbepger NO. 4142 Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 SG/~NED FEB 2 1 2007 /&j--/05- Field: Kuparuk U:.rc- Well Job # BL Log Description Date Color CD 10-111. 11638816 INJECTION PROFILE 01/24/07 1 1 H-19 . 11663824 INJECTION PROFILE 01/25/07 1 2T -30 . 11663825 PRODUCTION PROFILE 01/26/07 1 2K-02 11663829 PRODUCTION PROFILE 01/30107 1 3J-02 11632653 INJECTION PROFILE 01/30107 1 3J-08 11632657 INJECTION PROFILE 02/03/07 1 2M-OS 11632658 SBHP SURVEY 02/04/07 1 1A-19· 11632660 PRODUCTION PROFILE 02/05/07 1 3J-04 . 11628963 INJECTION PROFILE 02/08/07 1 1C-09 . 11638818 INJECTION PROFILE 02/09/07 1 2M-26 11638819 INJECTION PROFILE 02/10/07 1 1D-03 11628967 PRODUCTION PROFILE 02/11/07 1 1C-20 N/A RSTIWFL 02/12/07 1 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. ¡/j . . MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: ~~ S~~~isor 7~1 CD 1111 04~ DATE: Wednesday, August 04, 2004 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 3J-04 KUPARUK RIV UNIT 3J-04 FROM: Chuck Scheve Petroleum Inspector Src: Inspector Reviewed Bp-' P.I. Suprv~ߣ- Comm NON-CONFIDENTIAL Well Name: KUPARUKRIV UNIT 3J-04 API Well Number: 50-029-21400-00-00 Inspector Name: Chuck Scheve Insp Num: mitCS040803204253 Permit Number: 18S-16S-O Inspection Date: 8/312004 Rei Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 3J-04 Type Inj. S TVD 6536 IA 1200 2200 2150 2150 P.T. 1851650 TypeTest SPT Test psi 1497.5 OA 250 250 250 250 Interval 4YRTST PIF P Tubing 2820 2820 2820 2820 Notes: Pretest pressures observed for 30+ minutes and found stable. Well demonstrated good mechanical integrity. Wednesday,J\ugustO4,2004 Page I of I MEMORANDUM TO: Dan Seamount Commissioner THRU' Blair Wondzell ~~ P.I. Supervisor FROM: John Cris~ J~::~" Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: September 9, 2000 SUBJECT: Mechanical Integrity Tests Phillips Alaska Inc. 3J Pad 01,02 04,05,08 Kuparuk River Unit Kuparuk River Field NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. WellI 3J-01 I Typelnj. l S' I T.V.D. 16047 I Tubing J 2925 12925 12925 I P.T.6.I 1851620 ITypetest[ P I Testpsil 1512. ] CasingI 103011850118501 Notes: WellI 3j-02 I Typelnj. I S I T.V.D. ! 6011 I Tubingl 2940 I 2940 [ 2940 I P.T.D.[ 1851630 Typetest! P [TestpsiI 1503 [CasingI 700 I 17~0 I 17201 Notes: W~llI 3J-04I Type,nj.I s I T.v.D. 15990 I Tubm12900 12900 12900 I P.T.D.I 1851650 ITypetestl P iTestpsi/ 1498 ICasingl 640 1'1620 I 1570'I Notes: "Well} 3J-05 I Typelnj.! S I T.V.D. 16067 I Tubing| 2925I=~=~ I=~=~ I P.T..B.! 1852130 ITypetestI P ITestpsil !,517 J Casing| 50O 1"19001 1900I Notes: , P.T.D.I 1852160 Notes: ITypelnj.{ S i ~.v.~. i 599d ITubingl 2950 I 2950 I 2950 I =~o I'nterVa'l 4 TYpet~'stI P ITestpsil 1498 I Casingl 640 11730|1700116901 P/F I P- Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test dudng Workover O= Other (describe in notes) Test's Details 5 MIT's performed, no failures witnessed. Phillips rep. Peter Nazaticky had all wells fluid packed & ready to test. .I.T.'s performed: 5_ Attachments: Number of Failures: 0 Total Time during tests: 2 hrs. cc: MIT report form 5/12/00 L.G. Vufoklmp.xls 9/13/00 STATE OF ALASKA ~ OIL AND GAS CONSERVATION REPORT OF SUNDRY WELL OPERATIONS 0 RIG 1. Operations Performed: Operation Shutdown Stimulate Plugging ~ Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 815' FSL, 564' FEL, SEC.3, T12N, R9E, UM At top of productive interval 1534' FSL, 1323' FWL, SEC.10, T12N, R9E, UM At effective depth 1135' FSL, 1375' FWL, SEC.10, T12N, R9E, UM At total depth 1115' FSL., 1387'~ FWL~ SEC.10~ T12N, R9E, UM 12. Present well condition summary Total Depth: measured 8544' feet true vertical 6536' feet Plugs (measured) 6. Datum elevation (DF or KB) RKB 81' 7. Unit or Property name Kuparuk River Unit feet 8. Well number 3J-04 9. Permit number/approval number 85-165 ! 7-341 10. APl number 50-029-2140000 11. Field/Pool Kuparuk River Field Kuparuk River Oil Pool Effective depth: measured true vertical 8526' feet Junk (measured) 6526' feet 13. Casing Length Structural Conductor 77' Surface 4 2 6 4' Intermediate Production 8 4 9 2' Liner Perforation depth: measured 8137', 8141', true vertical 6238', 6242', Size Cemented 1 6" 183 SX AS II 9 - 5 / 8" 1400 SX AS III & 34O SX CLASS G 7" 350 SX CLASS G & 25O SX AS I Measured depth True vertical depth 111' 111' 4298' 3414' 8526 6525' 8144', 8146', 8151', 8174'-8214', 6244', 6246', 6249', 6185'-6926' Tubing (size, grade, and measured depth) 2-7/8" J-55 @ 7881' Packers and SSSV (type and measured depth) CAMCO HRP-1A-1SP ~ 7808 and CAMCO TRDP-1A-SSA ~ 1818' Stimulation or cement squeeze summary CONVERTED FROM PRODUCING WELL TO WATER INJECTION WELL Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Av~raae Prqd~Jction qr In!ec~i0n OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 585 1046 2 16 0 0 1979 Tubing Pressure 128 1467 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Water Injector _*. Oil Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed C"('~0 ' ~ Title Petroleum Engineer Form 10-404 Rev 09/12/90 Date '"'"'~/~ SUBMIT IN DUPLICATE 1. Type of Request: STATE OF ALASKA _ ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operation Shutdown m Stimulate __ Plugging Perforate Pull tubing Alter casing Repair well Pull tubing Other 2. Name of Operator AR00 Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 815' FSL, 564' FEL, Sec. 3, T12N, R9E, UM At top of productive interval 1534' FSL, 1323' FWL, Sec. 10, T12N, R9E, UM At effective depth 1115' FSL, 1387' FWL, Sec. 10, T12N, R9E, UM At total depth 12. Present well condition summary Total Depth: measured true vertical 8 5 4 4' feet Plugs (measured) 6536' feet 8437' 6. Datum elevation (DF or KB) 81' RKB feet 7. Unit or Property name Kuparuk River Unit 8. Well number 2J-04 9. Permit number/approval number 8-99 10. APl number ~;0-029-21400 11. Field/Pool Kuparuk River Oil Pool Effective depth: measured 8 5 2 6' feet Junk (measured) true vertical 6526' feet Casing Length Size Cemented Structural Conductor 1 1 1' 1 6" 183 Sx AS II Surface 4298' 9 5/8" 1400 Sx AS III & Intermediate 340 SX Class "G" Production 852 6' 7" 350 SX Class "G" Liner 250 SX AS I Perforation depth: measured 7966'-7984', 8012'-8016', true vertical 6109'-06123', 6144'-6146', Measureddepth 111' 4298' 8526' 8134'-8156', 8174'-8214' 6236'-6253', 6266'-6296' Tubing (size, grade, and measured depth) 2 7/8", J-55, tbg w/tail @ 7881' MD Packers and SSSV (type and measured depth) Camco TRDP-1A-SSA SSSV @ 1818', Camco HRP-1SP, Packer @ 7808' True vertical depth 111' 4298' 8526' MD TVD 13. Stimulation or cement squeeze summary 14. Intervals treated (measured) Treatment description including volumes used and final pressure Representative Dally Average Production or Iniection Data ~":~'~ ~' ':~:" OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 2307 1240 2300 3000 1300 2300 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Oil Gas Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Service Water Inj. Form 10-'404 I~'v 06/15/88 Title Date SUBMIT IN DUPLICATE ARCO Alaska, In¢ Subsidiary of Atlantic Richfield Company WELL IPBDT CONTRACTOR RI:MARKS J FIELD - DISTRICT- STATE OPERATION AT REPORT TIME WELL SERVICE REPORT IDAYS DATE , / C) Z4;) - /,30,0 --- [-'1 CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK Report °F °F miles ~", I'~ON-~. · ~v~c.-1/,,4/,.ILS knots REMARKS CONTINUED: c _ _ _ _ DESCRIPTION DAILY · ACCUM. TOTAL CAMCO OTIS SCHLUMBERGER DRESSER-ATLAS HALLIBURTON ARCTIC COIL TUBING FRACMASTER B. J. HUGHES Roustabouts Diesel _~'O,~¢~.~_ ¢ . r..b~ P,/8 Methanol Supervision Pre-Job Safety Meeting AFE TOTAL FIELD E~'rlMATE 33-4 )< p..u 5- 7- 8 8 . ~-/. ~,,-, ARCO Alaska, Inc. ~ Post Office B~0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 February 17, 1988 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton' Commi ssion Attached in triplicate are multiple Applications on Kuparuk wells. The wells are listed below. Wel 1 Action 2G-9 Fracture 2D-16 Perforate & Stimulate 2F-10 Perforate & Stimulate 3M-21 Perforate & Stimulate 2E-11 Stimulate 2H-15 Perforate 2H-13 Perforate 3M-1 Perforate & Stimulate 3M-2 Conversion 3M-10 Conversion 3M-15 Conversion 3M-16 Conversion 3J-4 Perforate 3J-9 Perforate 3J-13 Perforate If you have an.y questions, please call me at Sincerely, for Sundry Approvals Anticipated Start Date February, 1988 March 4, 1988 March, 1988 February, 1988 February, 1988 February, 1988 February, 1988 February, 1988 February, 1988 February, 1988 February, 1988 February, 1988 March, 1988 March, 1988 March, 1988 265-684O. G. B. Smallwood Senior Operations Engineer GBS:pg:0154 Attachments cc' File KOE1.4-9 ARCO Alaska, Inc. is a Subsidiary of AtlanlicRichfieldCompany STATE OF ALASKA ALASK. OIL AND GAS CONSERVATION COMrv,-..~,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ?. Re-enter suspended well ~ Alter casing ~ Time extension [: Change approved program ~ Plugging ~ Stimulate ~ Pull tubing [] Amend order ?(' Perforate ~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchoraqe, Alaska 99510 4. Location of well at surface 815' FSL, 564 FEL, Sec. 3, T12N, RgE, UM At top of productive interval 1534' FSL, 1323' FWL, Sec. 10, T12N, R9E, UM At effective depth 1115' FSL, 1387' FWL, Sec. 10, T12N, R9E, UM At total depth 11. Present well condition summary Total depth: measured true vertical 5. Datum elevation (DF or KB) RKB 81' 6. Unit or Property name Kuparuk River Unit 7. Well number ,, 3J-04 / / icrc t'c] r 8. Permit number 85-165 feet 8544' feet Plugs (measured) 6536' feet 9. APl number 50-- 029-2].400 10. Pool Kuparuk River 0il Pool 8437' MD 6458' TVD Effective depth: measured true vertical 8526' feet Junk (measured) 6526' feet Casing Length Structural Conductor 111 ' Surface 4298' Intermediate Production 8526' Liner Perforation depth: measured true vertical Tubing (size, grade and measured depth) Size Cemented Measured depth 16" 183 Sx AS II 111' 9-5/8" 1400 Sx A.S. III 4298' 340 Sx Class "G" 7" 350 Sx Class "G" 8526' 250 Sx A.S. I 8174'-8214' 8137' 8141' 8144' 8146 8151' 6185'-6296' 6238' 6242' 6244' 6246' 6249' 2-7/8" J-55 7881' True Vertical depth 111' 4298' 8526' Packers and SSSV (type and measured depth) . SSSV @ 18181; Camco TRPP-1A-SSA; Packen Ca 7808' Camco. HRP-,IA-1SP 12.Attachments Description summary of proposal [] Detailed operations program ~ BOP sketch [] Perforate C Sand, .add A Sand perforations. 13. Estimated date for commencing operation March 1, 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity Q BOP Test ~OL~¢¢tion clearance I Approveo Returned,-~ ORIGINAL S'GNED BY Approved by LONNIE C. SMITH Commissioner by order of the commission Date.,_~" Form 10-403 Rev 12-1-85 Submit in triplicate~,--- ATTAClIMENT 1 PAGE 3 KUPARUK RIVER FIELD CONSERVATION ORDER 198 RULE 4 - INJECTIVITY PROFILES SECOND QUARTER 1987 SUBMITTAL WELL APl NUMBER NUMBER 50-029 '""'~3B-01 / 21318 '""--.~3B-07~'/ 21337 '"'""~3B-12~--'/' 21370 3C-02 21414 '""~3F-03c-~'/ 21448 3J-04 214OO "'"~3J-05~'''/' 21436 '"~3J-08'-'''/ 21439 3J-13 21495 3J-16 21498 DATE OF DATE OF DATA TYPE REASON FOR INITIAL PROFILE/ PROFILE/ PROFILE/ INJECTION SURVEY SURVEY SURVEY WELL COMPLETION 01/23/87 05/23/87 SPINNER INITIAL A&C SS 01/23/87 05/22/87 SPINNER INITIAL A&C SS 01/24/87 05/21/87 SPINNER INITIAL A&C SS 01/09/86 06/22/87 SURVEY FOLLOWUP A&C SS 05/24/87 04/01/87 05/28/87 05/28/87 03/01/87 03/31/87 SPINNER SURVEY SPINNER SPINNER SURVEY SURVEY NITIAL NITIAL NITIAL NITIAL NITIAL NITIAL 01/21/87 05/21/87 02/02/87 02/02/87 02/02/87 02/02/87 A&C SS A S A&C SS A&C SS A S A S ZONES TAKING WATER A&C A&C A&C A&C A&C A A&C A&C A A INJECTION BWPD 2530 A SAND 1240 C SAND 1927 932 1072 RECEIVED &laska 0il & Gas Cons. Commission A~,~,Ci 2...;9 STATE OF ALASKA ALAS.. OIL AND GAS CONSERVATION COM,. _.~SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown [] Re-enter suspended well ~ Alter casing [] Time extension L' Change approved program ,,~ Plugging [] Stimulate .~ Pull tubing ~ Amend order ~ Perforate lq Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.0. BOX 100360, Anchorage, Alaska 99510 4. Location of well at surface 815' FSL, 564 FEL, Sec. 3, T12N, R9E, UN At top of productive interval 1534' FSL, 1323' FWL, Sec. 10, T12N, RgE, UM At effective depth 1115' FSL, 1387' FWL, Sec. 10, T12N, R9E, UM At total depth 5. Datum elevation (DF or KB) RKB 81' 6. Unit or Property name Kuparuk River Unit 7. Well number 3J-04 feet 8. Permit number 85-165 9. APl number 5o-- 029-21400 lO. 'P°°lKuparuk River Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth' measured true vertical 8544' 6536' feet feet 8526' feet 6526' feet Plugs (measured) Junk (measured) 8437' MD 6458' TVD Casing Length Size Structural Conductor 111' 16" Surface 4298' 9-5/8" Intermediate Production 8526 ' 7" Liner Perforation depth: measured true vertical Cemented Measured depth Tubing (size, grade and measured depth) 183 Sx AS II 1400 Sx A.S. III 340 Sx Class "G" 350 Sx Class "G" 250 Sx A.S. I 8174'-8214' 8137', 81411, 8144', 8146, 8151' 6185'-6296' 6238', 6242', 6244', 6246', 6249' 2-7/8", J-55, 7881' ~ue Vertical depth 111' 111' 4298' 4298' 8526' 8526' Packers and SSSV (type and measured depth) SSSV @ 1818'; Camco TRPP-1A-SSA; Packen @ 7808' Camco HRP-1A-1Sp 12.Attachments Description summary of proposal .,~ Detailed operations program~ m BOP sketch Convert to water injection 13. Estimated date for commencing operation Hay 18, 1987 14. If proposal was verbally approved Name of approver~r' L. Smith Date approved 5/18./87 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed '~- ~ ~ Title ~P~'_,~'/m/c,~..~' ~,~//Ut~,~.~ Commission Use Only Conditions of approval Notify commission so representative may witness Approved by Date [] Plug integrity [] BOP Test [] Location clearance Commissioner I Approva, No. ,.~ by order of the commission Form 10-403 Rev 12-1-85 Submit in triplicate ARCO Alaska, Inc. Post Office Bc ;0360 Anchorage, Alasr;a 99510-0360 Telephone 907 276 1215 October 31, 1986 RETURN TO: ARCO ALASKA, INC. ATTN: Kuparuk Records Clerk AT0-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmittal ~5806 Transmitted herewith are the following items. Please acknowledge receipt and return one signed copy of this transmittal. Final --~-~-IR- 14 ~J~IR- 14 2A-14 -~3A-1 f3A-2 -J_J-3A-3 · . 3A-15 ~-~ 3A-16 -J--- 3C-15 '-J --3C-16 ~,~ J3F-1 __ 3F-10 ---3F.:.l 1 ~3J-4 ~3d-6 ~3J-9 Prints: CET/CEL 10-12-85 Run #2 8600 CET/CEL 10-13-85 Run #3 85.50 CET/CEL 10-02-85 Run #1 6795 ~1 7550 CET/CEL 10-01-85 Run ~ CET/CEL 10-01-85 Run= ~1 6680 CET/CEL 10-01-85 Run #1 6080 CET/CEL 12-30-85 Run ~2 6400 CET/CEL 12-30-85 Run =2 7300 CET/CEL 10-!5-85 Run ~1 5887 CET/CEL 10-15-85 Run #1 3995 ~1 7000 CET/CEL 10-17-85 Run ~ .CET/CEL 12-19-85 Run ~1 5166 CET/CEL 12-19-85 Run #1 6950 CET/CEL 10-05-85 Run #1 6860 CET/CEL 10-19-85 Run ~1 7000 CET/CEL 12-18-85 Run ~1 36 - 9120 - 8894 - 7763 - 9467 - 8570 - 8256 - 8038 - 9030 - 7730 - 6753 - 8488 - 6483 - 8322 - 8410 - 8487 - 6678 REC IV · Receipt Acknowledged: ~/ "~VD:~tSe.'tSa~J - ~.~ SK Drilling Vault(1 film) A~CO Alask-". /nc. is e Subsidla~'y of AllanhcRichfieidCornpany STATE OF ALASKA " ~ ALASKA OIL AND GAS CONSERVATION CONiMISSION '~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG Classification of Service Well 4,'r,, GAS [] SUSPENDED [] ABANDONED [] SERVICE [] .... t~.~ 7. Permit Number 1. Status of Well 2. Name of Operator Alaska, Inc. 85-165 ARCO 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 029-21400 B0-- 4. Location of well at surface 9. Unit or Lease Name 815' FSL, 564' FWL, Sec.3~ T12N, RgE, UM Kupaurk River Unit A~ To~. Producing Interval 10. Well Number 53~' FSL, 1323' FWL, Sec.lO, T12N, RgE, UM 3J-4 At Total Depth 11. Field and Pool 1115' FSI., 1387' FWL, Sec.10, T12N, RgE, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 16.Lease Designation and Serial No. Kuparuk River Oil Pool 81' RKB I ADL 25630 ALK 2563 12. Date Spudded 13. Date T.D. Reached I 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 09/10/85 09/16/85 I 09/18/85' N/A feetMSL 1 17. Total Depth (MD+TVD) 20. Depth where SSSV set 18.Plug Back Depth (MD+-i-VD) 19. Directional Survey 21. Thickness of Permafrost 8544'MD,6536'TVD 8437'MD~6458'TVD YES E~x NO [] 1818 feetMD 1700' (approx) 22. Type Electric or Other Logs Run D IL/SFL/SP/Ca]/FDC/CNL/GR~ CET, GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.b# H-4(J Surf 111' Z%" 183 sx AS II 9-5/8" 36.0# J-55 Surf 4298' 12-1/4" 1400 sx AS III & 340 sx Class G Top job performed w/250 sx AS I 7" 26.0# J-55 Surf 8526' 8-1/2" 350 sx Class "O" & 250 sx AS I 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 8174' - 8214' w/4 spf, 90° phasing 2-7/8" 7881' 7808' 8137 ' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 8141 ' DEPTH INTERVAL (MD)! AMOUNT & KIND OF MATERIAL USED 8144' 8146' See attached Adde~ndum, dated 2/27/86. 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested TEST PRODUCTION PERIOD I~FOR OIL-BBL GAS-MCF WATER-BBL CHOKESlZE GAS-OIL RATIO Flow Tubing Casing Pressure CALCULATED I~ OIL-BBL GAS-MCF WATER-BBL OILGRAV TY-API (corr) Press. 24-HOUR RATE ~' 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE Form 10-407 * NOTE: Tubing was run & well perforated 12/20/85. GRU1/WC18 RFCEiV£D APR0 7 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE Il GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. , Top Kuparuk C 7910' 6065' I N/A Base Kuparuk C 7975' 6114' Top Kuparuk A 8117' 6222' . Base Kuparuk A 8274' 6339' I 31. LIST OF ATTACHMENTS Addendum (dated 2/27/86) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge '1 INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing'a~hd the. lo¢,ation of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. :Item 28:" If no cores taken, indicate "none". Form 10-407 ADDENDUM WELL: 3J-4 FRACTURE STIMULATION SbIMMARY Begin Frac Work At: 1036 hrs, 1/14/86 Frac Kuparuk "A" sand perfs 8137', 8141', 8144', 8146', 8151' & 8174'-8214' in 9 stages per 12/23/85 procedure using gelled diesel w/Musol, 100 mesh & 20/40 sand. Press'd ann to 2300 psi w/diesel. Tst ins to 8000 psi; OK. Stage 1: Pmp'd 20 bbls 5% U-66 Musol @ 21BPM/2700 psi. Stage 2: 55 bbls gelled diesel spacer @ 1.5 BPM @ 2810/2700 psi. Stage 3: 40 bbls gelled diesel @ 20 BPM @ 4280/4150 psi. Stage 4: 30 bbls gelled diesel @ 5 BPM, 2800 psi. Stage 5: 18 bbls gelled diesel w/100 mesh, 1 ppg sand @ 19.6 BPM w/final press of 4130 psi. Stage 6: 60 bbls gelled diesel spacer @ 19.6 BPM w/final press of 4360 psi. Stage 7: 27 bbls gelled diesel w/20/40 mesh, 3 ppg sand, @ 19.6 ppg w/final press of 3800 psi. Stage 8: 35 bbls gelled diesel w/20/40 mesh, 8 ppg sand @ 14 BPM w/final press of 4200 psi. Stage 9: 53 bbls gelled diesel flush @ 20 BPM w/final press of 4290 psi. Pmp'd 750# 100 mesh, 1 ppg, 2200# 20/40, 3 ppg & 8085# 20/40, 8 ppg, sand in formation leaving 840# 20/40, 8 ppg sand in 7" csg. Load to recover 313 bbls of diesel. Job complete @ 1909 hrs, 1/14/86. Drilling SUperintendent / D~te 9 IO e· .? 6- · 5 4- · $ 2. · I 15 13 ii m R£$ERVE PIT -- -- -- 5-- NOTES I. COORDINATES ARE A.S.R,ZONE 4 7- 2. SECTION LINE DISTANCES ARE TRUE. 3 HORIZONTAL POSITIONS BASED ON THE D.S.-3J NORTH- WEST ~ SOUTHWEST WINDOW CORNERS PER FR.B. &ASSOC. 4. VERTICAL POSITIONS BASED ON TBM 85-?-27-1 ?ER 8- LHD ~ ASSOC. 5. O.G. ELEVATIONS INTERPOLATED FROM S/C DWG. CED - RIXX -- :5060 rev. 9- · ...-- .,~:'"' '-" ' - ~ ~ 4%...'~ ~.. ,,,~e,,,e, .W. ('"' m T",..~.~. ~ X F. ROBERT BELL w "~oc '- ' . I HEREBY CERTIFY THATIA~ PROPERLY REGISTERED ~ND 13- LISCENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, THAT THIS PLAT REPRESENTS ~ SURVEY ~ADE UNDER ~Y DIRECT SU~VI~IO~ AND THAT ALL DETAI~S A~E CORRECT A~ OF JULY ~O, IB85. ~- AS Y= 6,002,422,64 X= 519,544.60 563' [WL, 740 ¥= 6,002,447.64 X= 519,544.66 563 FWL, 765 Y= 8,002,472.59 X= 519,544.60 563 FWL, 79O Y= 6,002,497.59 X= 519,544.63 564 FWL, 815 Y= 6,002,522.57 X= 519,544.65 564 FWL, 840 Y= 6,002,547.61 X- 519,544.65 564 FWL, 865 Y: 6,002,572.61 X= 519,544.67 564 FWL, 890' Y= 6,002,597.57 X= 519,544.68 564 FWL, 915 FSL, Y= 6,002,672.63 X= 519,544.74 564 FWL, 990' Y= 6,002,697.65 X= 519, 5/+4.74 585 :~:L, 1015' Y= 6,012,722.64 X= 519.544.73 I CONDUCTORS I-i$ ii LAT. 70025'04.020'' LONG. 149050 26. 870" FSL, OG. /+1.3, PAD /+5.3 LAT. 70°25'04.266" LONG· 149°50 26. 866" FSL, 00.41.0, PAD 45.6 LAT. 70°25'04.512" 149o50 26. 866" 40.9, PAD 45.4 70025 ' 04. 758" 149°50 26.863" 40.8, PAD 45.5 70025 05.003" 149o50 26.861" 40.9 PAD 45.4 70°25 05·250" LONG. 149o50 26. 859" FSL, OG. /+1.0, PAD /+5./+ LAT. 70o25 05.495" LONG. 149o50 26. 856" FSL, OG. 41.1, PAD. 45.3 LAT. 70°25 05.741" LONG· 149°50 26. 854" OG. 41.2, PAD. 45.3 LONG· FSL, OG. LAT. LONG. FSL, OG. LAl. LONG. FSL, OG. LAT. LAT. LONG. FSL, OG. LAT. LONG· FSL, OG. LAT. LONG. 70025 05.479" 149050 25.845" 41.0, PAD 45.5 70025 06.725" 149°50 26.845" 41.0, PAD /+5.4 70°25'06.971'' 149o50 26.843" 5 Y x 5 Y= 6,0 -,772.67 x= 519.--~4.78 565 F..._, lOgO' Y: 6,0; -,797.59 X= 519.:~.78 565 F .... 1115' Y: 6,0" ;,822.60 65 F~=, 1040" FSL, OG. 40.7, PAD 45.3 = 6,002,747.62 LAT. 70°25'07.217'' = 519,~44.78 LONG· 149o50 26.840" 65 F~_, 1065'FSL, OG. 40.7, PAD 45.5 LAT. 70°25'0 .463" LONG. 149050 26.837" :SL, OG. 40.4, PAD 45.4 LAT. 70o25'07.708" LONG.149oso'26.836'' =SL, OG. 40.3, PAD 45.5 LAT. 70°25'07.954'' LOCATED IN PROTRACTED SEC. 3, TI2 N, R9E, U.MER. 15- , ...... ~.~= '~k~Lk ~ ¢' ~. X 51o :44 80 LONG 1~9°50'26 833" ~ ~ ~ ~ ~ ~ ~ 16- Y= 6,0r-~,847.58 LAT. 70025'08.200" ~' ~ 2~ 'AL, 1165 FSL 0G. 40.0, PAD. 4S.~ ~ < ~ ~ ~'~ z ~, CONDUCTOR AS-BUi LT ~ ~ HIS T~ ~ ~ ~Lr ~SURVE~ / ~¢,.~ ~l I LOCATIONS ARCO Alaska, Inc. Post Office B( ;)0360 Anchorage, Ala,¢<a 99510-0360 Telephone 907 276 1215 February 11, 1986 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Well Completion Reports Dear Mr. Chatterton' Enclosed are Well Completion Reports for the following wells' 3J-1 3J-4 If you have any questions, please call me at 263-4944. Sincerely, d. ~ruber ^ssoc~ate [n§~neer JG/tw GRU13/L87 Enclosures Ancho~'a(je ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COIV~MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well OIL ~X GAS [~ SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-165 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 029-21400 50- Classification of Service Well 4. Location of well at surface 815' FSL, 564' FWL, Sec.3, T12N, R9E, UM At Top Producing Interval 1534' FSL, 1323' FWL, 5ec.10, T12N~ R9E, UM At Total Depth 1115' FSL, 1387' FWL, Sec.10, T12N, R9E, UM 5. Elevation in feet (indicate KB, DF, etc.) 81 ' RKB 6. Lease Designation and Serial No. ABL 25630 ALK 2563 9. Unit or Lease Name Kupaurk River Unit 10. Well Number 3J -4 11. Field and Pool Kuparuk River Field Kuparuk River Oil Pool 12. Date Spudded 09/10/85 13. Date T.D. Reached 09/1 6/85 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+l-VD 8544 'ND ,6536 'TVD 8437 'MD ,6458 'TVD 22. Type Electric or Other Logs Run DIL/SFL/SP/Cal/FDC/CNL/GR, CET, GCT 14. Date Comp.,Susp. orAband. 15. Water Depth, if offshore 116. No. of Completions 09/18/85* N/A feet MSLI 1 19. Directional Survey ! 20. Depth whereSSSV set 21. Thickness of Permafrost YES ~XX NO [] [ 1818 feet MD 1700' (approx) 23. CASING, LINER AND CEMENTING RECORD CASING SIZE i6" 9-5/8" 71' WT. PER FT. 62 .b# 36.0# 26.0# GRADE H-~U J-55 J-55 SETTING DEPTH MD TOP BOTTOM 5u rf 1 I I ' Surf 4298' Surf 8526' HOLE SIZE 24" 12-1/4" 8-1/2" CEMENTING RECORD 1 83 sx A3 I I 1400 sx AS III & 340 s~ Top job performed w/25C 350 sx Class "G" & 250 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD AMOUNT PULLED C1 ass G sx AS I sx AS I interval, size and number) 8174' - 8214' w/4 spf, 90° phasing 8137 ' 8141 ' 8144 ' 8146' 8151 ' SIZE 2-7/8" DEPTH SET MD) 7881 ' PACKER SET (MD) 7808' 26. ACID, FRACTURE CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested Casing Pressure Flow Tubing Press. PRODUCTION FOR OIL-BBL TEST PERIOD I~ CALCULATED , O L-BBL 24-HOUR RATE ~ GAS-MCF GAS-MCF 28. CORE DATA WATER-BBL CHOKE SIZE GAS-OIL RATIO WATER-BBL OIL GRAVITY-AP (corr) Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE Form 10-407 * NOTE: Tubing was run & well perforated 12/20/85. TEMP3/WC86 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Top Kuparuk C Base Kuparuk C Top Kuparuk A Base Kuparuk A GEOLOGIC MARKERS MEAS. DEPTH TRUE VERT. DEPTH 6065' 6114' 6222' 6339' 30. FORMATION TESTS 7910' 7975' 8117' 8274' Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS Well History (completion details) 32. I hereby certify that the foregoing is true and correct to *h~ best of my knowledge Associate Engineer Signed ~, ~ ~.~~ Title Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt. water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Oil and Gas ComPany Daily Well History-Final Report Instructions: Prepare and submit Ihe "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged. Abandoned, or Sold. "F~nal Reporr' should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official tast is not required upon completion, report completion and representative test data in blocks provided. The "Final Report'! form may be used for reporting the entire operation if space is available. District ICounty or Parish Alaska I North Slope Borough Field ~Lease or Unit Kuparuk River I ADL 25630 Auth, or W.O. no. ~Yitle AFE AK0111 I Completion API 50-029-21400 Operator Accounting State cost center code Alaska Well no. 3J-4 Spudded or W.O. begun Complete Date and depth as of 8:00 a.m. Nordic 1 A.R.Co. W.I. ARCO Alaska, Inc. 56.24% Date 12/20/85 Complete record for each day reported 12/20/85 12/21/85 Iotal number of wells (active or inactive) on this DSt center prior to plugging and I bandonment of this well I our J Prior status if a W,O, I ' 0215 hrs. 7" @ 8526' 8437' PBTD, POOH w/perf gun #1 10.2 ppg NaC1/NaBr Accept rig @ 0215 hrs, 12/20/85. ND tree, NU & tst BOPE. RIH w/perf gun #1, 90° phasing, limited entry @ 8137', 8141', 8144', 8146' & 8151'. 7" @ 8526' 8437' PBTD, RR Diesel Perf limited entry, 90° phasing @ 8137', 8141', 8144', 8146', 8151'. Perf w/4", 4 SPF, 90° phasing f/8174'-8214'. Rn 249 its, 2-7/8", 6.5#, J-55 EUE 8RD tbg w/SSSV @ 1818', HRP pkr @ 7808', "D" Nipple @ 7847', TT @ 7881'. Tst tbg & ann to 2500 psi. Tst SSSV & orifice. Tst tree to 250/5000 psi. RR @ 1830 hfs, 12/20/85. Old TO Released rig New TO Date 1830 hrs. Classifications (oil, gas, etc.) Oil Producing method Flowing Potential test data 12/20/85 PB Depth 8421 ' PBTD Kind of rig Rotary Type completions(single, dual, etc.) Single Official reservoir name(s) Kuparuk Sands Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signature For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Drilling Superintendent ARCO Alaska, Inc. Post Office ilex i00360 .'\nchorafie, Alaska 995'10-0360 Telephone 907 276 i215 January 6, 1986 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Alaska 0i! & (~as O~ms~ 6c, h,,nfissio~ SUBJECT: 3J-4 Dear Mr. Chatterton: Enclosed is a copy of the 3J-4 Well History to include with the Well Completion Report, dated 12/9/85. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/mh GRU13/L165 Enclosure cc: 3J-4 Well File ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARC° 011 and Gas Company W~il History -lniuai Report Daily I~T;~tructlent: Prepare and submit the "Initial Report" on the ficst Wednesday after a well is spudded or workover operations are started. Dally work prior to spudding should be sum'matlzed on the form giving inclusive dates only, District Field Alaska TCounty, parish or borough North Slope Borough ADC 25630 Title -' -- Drill Kuparuk River Auth. or W.O. no. AFE AKO 111 Parker 191 Operator ARCO Alaska, Inc. Soudded or W.O. begun 1Data 1Hour Spudded 9/10/85 2215 hrs. Date and depth as ol 8:00 a.m. 9/11/85 9/12/85 Complete record fdr each day reported ~--,~ r.;;~ iARCO~W.i. Prior status if a W.O. 16" @ 111' 1095' (984'), Dyna Drl'g Wt. 9.5, PV 20, YP 30, PH 10.0, WL 16, Sol 6 Skid rig, ~ccept ri~ @ 1815 hrs, 9-10-85. NU Hydril & diverter sys, Spud @ 2215 hfs, 9-10-85. DD f/111'-1095'. 705', 4.6°, N63.2E, 704.92 TVD, -1.2 VS, N1.77, E3.5I 16" @ 111' 4315' (3220'), TOH Wt. 9.8, PV 13, YP 17, PH 10, WL 13.6, Sol 8 DD f/1095'-2003', trip f/bit & BHA, drl f/2003'-4315' mud, TOH. 916', 7.1°, S52.1E, 914.82 TVD, 4.20 VS, 1335',22 2°, S18.1E, 1320.25 TVD, 98.03 VS, . C&C S.31, E24.92 S87.12, E76.65 1766',39 1950',48 2544',48 3162',46 3776',45 4270',43 .9°, S15.6E, 1687.76 TVD, 320.11VS, S303.88, E127.68 .00, Sll.aE, 1820.23 TVD, 447.38 VS, S427.95, E157.92 .5°, S12.6E, 2215.76 TVD, 889.95 VS, S861.10, E251.57 .7°, Sll.6E, 2632.48 TVD, 1345.55 VS, S1307.33, E347.23 .9°, SIO.3E, 3056.68 TVD, 1789.19 VS, S1743.15, E431.55 .1°, Sll.3E, 3409.03 TVD, 2135.24 VS, S2083.27, E496.43 9/13/85 9/14/85 thru 9/16/85 9-5/8" @ 4298' 4315' (0'), Cementing 9-5/8" csg Wt. 10.1, PV 14, YP 10, PH 9.5, WL 14, Sol 10 POOH f/26 std short trip. TIH wsh & ream hole f/2264'-3100', fin TIH, pmp Bi-Vis sweep & circ cln. Drop single shot surv, pmp pill,.TOH. RU & rn 107 its 9-5/8" csg to 4298'. Drop btm plug, tst ins @ 3000 psi, M&P 1400 sx AS III, drop spacer plug & top plug. Pmp 340 sx CL "G" @ 15.8 ppg. 9-5/8" @ 4298' 8057' (3742'), TOE Wt. 10.2, PV 15, YP 5, PH 9.5, WL 6, Sol 9 Bump plug. Perform top job w/250 sx AS I. ND diverter sys. NU &tst BOPE to 250/3000 psi. PU BHA, TIH, DO cmt, flt equip + 10' new formation. Conduct formation tst to 12.5 ppg EMW. Turbine drl & surv 8½" hole to 8057'. 4652' 5186' 5775' 6245' 6869' 7524' 7945' , 42.7°, S 9.7E, 3688.86 TVD, 2395.22 VS, 2338.95S, 543.82E , 42.3°, S 1.1E, 4082.57 TVD, 2755.27 VS, 2698.11S, 577.77E , 42.9°, S 5.4E, 4516.13 TVD, 3151.94 VS, 3096.15S, 600.37E , 43.3°, S 7.5E, 4859.31TVD, 3472.76 VS, 3415.26S, 636.45E , 43.9°, S 6.0E, 5311.19 TVD, 3902.75 VS, 3842.60S, 687.03E , 41.8°, S 9.5E, 5791.39 TVD, 4348.10 VS, 4283.98S, 747.10E , 40.8°, S10.9E, 6107.67 TVD, 4625.90 VS, 4557.45S, 796.30E 56.24% The above is c~,rect ~. $il~'~tqfe ~"k ~,i t e '" CONGDON For'~'m pfepa~atign and distribution, see Procedures Manual. Ser'tion In Drilling Superintendent ARCO Oil and Gas cOmpany Daily Well History- Final Report Inslruclions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time, On workovers when an official test is not required upon completion, report completion and representa&Lve test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. I Accounting cost center code District JCounty or Parish State Alaska I North Slope Borough · Alaska Field ILease or Unit I Well no. Kuparuk River ADL 25630 3J-4 Auth. or W.O. no. |Title AFE AK0111 J Drill Parker 191 API 50-029-21400 Operator J A.R.Co. W.I. ARCO Alaska, Inc. 56.24% Spudded or W.O. begun ~Date Spudded I 9/10/85 9/17/85 9/18/85 9/19/85 Complete record for each day reported Date and depth as of 8:00 a.m. I otal number of wells (active or inactive) on this ost center prior to plugging and bandonment of this well our ~ Prior status if a W,O. 2215 hrs. 9-5/8" @ 4298' 8544' (487'), Logging Wt. 10.2, PV 16, YP 9, PH 9.0, WL 6, Sol 10 Drl 8½" hole to 8544', short trip to 4297', C&C, POH f/logs. RU Schl & log. 8544', 44-3/4°, S7-3/4E, 6547 TVD, 5032.69 VS, 4958.87S,862.21E 9-5/8" @ 4298' 8544' (0'), RU to rn 7" Wt. 10.2, PV 11, YP 7, PH 9, WL 6.1, Sol 10 Fin logging. TIH f/wiper trip, rm 248', C&C mud, wsh out in DP, TOH to 7612', LD wsh'd out DP. RIH & rm 248', CBU, POOH, LD DP & BHA. Chg rams to 7" & tst. RU to rn 7" csg. 7" @ 8526' 8544' TD, 8437' PBTD, RR 10.2 ppg NaC1/NaBr RU & rn 201 its, 7", 26#, J-55 BTC csg w/FS @ 8526', FC @ 8437'. Cmt w/350 sx C1 "G" w/3% KC1, 9% D-127, .3% D-13 & .2% D-46. Displ w/10.2 ppg NaC1/NaBr. Good rtns thruout job. CIP @ 1700 hfs, 9/18/85. Cut csg, NU lower tree, tst pagk~o£~f ~o~ !~% ~ 3000 psi. RR @ 2200 hrs, 9/18/85. !~i. ii~i .... ~L !~ ~. Old TO ~ New TD PB Depth 8544 ' TD Released rig Date J K nd of rig 2200 hrs. 9/18/85 Classifications (oil, gas, etc.) I Type completion (single, dual, etc.) Oil I Single Producing method I Official-reservoir name(s) Flowing I Kuparuk Sands Potential test data Rotary Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T,P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form preparation and distribution, see Procedures Manual, Section 10, OrilllnCl P,q(3e~ 86 ~n~J 87 Drilling Superintendent ARCO Alaska, Inc. Post Office Do.~ ~00360 Anchorage, Alaska 99510-0360 Telephone 907 2'76 '1215 December 17, !985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' 3J-4 Dear Mr. Chatterton' Enclosed are tile Well Completion Report and gyroscopic survey for 3J-4. Tubing details will be submitted when the well is completed. If you have any questions, please call me at 263-4944. Sincerely, · Gruber Associate Engineer JG/tw GRU12/L139 Enclosures ARCO Alaska. Inc. is a Subsidiary ol AtlanticRichfieldCornpany STATE OF ALASKA ALASKA L:_~. qND GAS CONSERVATION CO~__!IISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [-XIX ABANDONED [] SERVICE [] __ 2, Name of Operator 7, Permit Number ARCO Alaska, Inc. 85-165 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21400 4. Location of well at surface 9. Unit or Lease Name 815' FSL, 564' FWL, Sec.3, T12N, R9E, UH ~ Kupaurk River Unit At Top Producing Interval ~ \/E,~IFIED i 10. Well Number 1534' FSL, 1323' FWL, Sec.10, T12N, R9E, UM /Surf._.~___! 3J-4 At Total Depth ~B. H...~,_; 11. Field and Pool 1115' FSL, 1387' FWL, Sec.10, T12N, RgE, UM ............... Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk River 0il Pool 81' RKB ADL 25630 ALK 2563 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 09/10/85 09/16/85 09/18/85 N/A feet MSL N/A -~7. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 8544'ND,6536'TVD 8437'ND,6458'TVD YES [~X NO[]I I/A feetMD 1700' (approx) 22. Type Electric or Other Logs Run D IL/SFL/SP/Cal/FDC/CNL/GR, CET, GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# N-40 Surf 111' 24" 183 sx AS Il 9-5/8" 36.0# J-55 Surf 4298' 12-1/4" 1400 sx AS Ill & 340 sx,Class G I Top job performed w/250 sx AS I 7" 26.0# J-55 Surf 8526' 8-1/2" 350 sx Class "G" & 250 ;x AS 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None N/A 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OILRATIO / TEST PERIOD I~ FIowTubing Casing Pressure CALCULATED.k, OIL-BBL GAS-MCF WATER-BBL OILGRAVITY-API (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE Form 10-407 TEMP2/I'~C72 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ~ 30.. GEoLoGIC:MARKERS ' '~ FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Kuparuk C 7910' 6065' N/A Base Kuparuk C 7975' 6114' Top Kuparuk A 8117' 6222' Base Kuparuk A 8274' 6339' 31. LIST OF ATTACHMENTS Gyroscopic Survey (2 copies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~~~ Title Ass°ci ate Engi neet Date /I , INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none" Form 10-407 SUB.~URFACE DIRECTIONAL ~URVEY ~UIDANCE ~]ONTINUOUS [~OOL Company Well Name Field/Location ARCO ALASKA INCORPORATED 3J-4,~815' FSL~ 564' ,FWL~ S3~ T12N~ R~E. UM KUPARUK, NORTH SLOPE, ALASKA Jol~ Re,ference No. 70914 HALFACRE 04-NOVEMBER-85 Computed By: ~CT OI~CT~ON~;, ~UPVP¥ C;.ISTO~EP I, ISTTNG FOR ARCO AbA~KA, INC. KUPARUK SUPVE¥ D~TEI ()~ nCT ~5 ENGINEERI MAI,F~CPE ~ETHOD$ OF COMPUTATInN TOOG bOC~'iCION: TANGENTI~G- averao~d dmvlatlon and azimuth TNTERPObATION: V~RTICA[, SECTION: HnRIZ. DIST. PROJ~C?ED nNTO A TaRgET AZTMUTN OF SOUTH 9 DEG 3 MIN EAST COMPUTATION DATF~ 4-NOV-05 ARCO ALASKA, TNC. 3j-4 KUPARUK NORTH SLOPE,ALASKA TRUE 5UR-$EA MEASURED VKRTICAL VEOTTC~L DEPTH DEPTH DEPTH INTERPOLATED VAt,UK$ FOR EVEN 100 FE~T COURSE VERTTCAb DUC6 DEVIATION AZIMUTH SECTION SEVE DFG MIN DEG MT~ FEET DEC 0.00 0.0o -81.o0 100,00 100.00 19.00 200.00 200.00 119.00 300.00 300.00 ~19.0o 400,00 4nO,O0 llO,O0 500.00 499.99 410.99 600,00 599.9q 110,99 700.~0 699.86 610.~6 800.O0 799.27 71~.~7 qO0.O0 008.44 ~17,44 1000.00 907,40 016.40 1100.00 1095 39 1014.39 1200.00 1i01:97 1110,07 1300.00 1206 51 1705.51 1400.00 1377:97 129~.q7 ,500 O0 1465.]5 1384.75 1600~00 ~550.44 14~9,44 1700.00 1631 40 1~50.4g 1~00.00 1.707~85 1626.85 1900.00 ~779.1~ 169~.1~ 2000.00 1845.32 1764.32 2100,00 1.910,17 1020.17 2200.00 1975.56 1994.56 2300.00 2041,32 1960.3'2 2400 O0 2107.1~ 2026.19 2500:00 217~,36 2097.36 2600 O0 2239.'~7 2150.77 2700:00 21ii,ii 2~25.40 2,00 ~ ~ ' ,S": 2~97.13 3000.00 2425.91 3100 O0 2493.77 {~00: 00 256~, 16 3300 0 OO.oo 3800, 3900,00 ]197,54 304~.54 0 0 ~ 0 0 E 0.00 0 1~ ~ 75 26 W O,OB 0 21 S 08 14 W 0.04 0 16 n ~5 57 w -0.07 0 5 S 60 0 W -0.11 0 9 ~ Jl 34 E 0,06 0 5~ ~ 05 36 E 0.37 5 ~ N 64 6 K -0,55 b 51 $ 87 5t E -1.R1 7 32 S 52 41 E 4.65 9 13 16 3O ~3 37 42 46 46 S 36 22 F 16.64 ~ S 30 57 E 34.71 55 $ 19 53 E 50.~0 20 S 17 9 E 91.6'7 13 $ 16 3 E 131.60 35 ~ 1.1 45 ~ 179.~3 47 S 11 26 E 232.36 54 ~ 15 4 E 290.71 23 ~ ~5 21 E 354.79 40 S 12 47 E 424.54 49 49 48 48 48 48 4.8 48 48 4B 34 S 12 10 F 490.41 24 ~ 1.2 3 E 575.43 54 $ ii 5~ E 650.99 50 $ 11 5l E 726,~3 41 S 11 54 E 001.38 30 $ 12 3 ~ 876.26 16 ~ 11 5~ E 950.93 10 S 11 49 E 1025.40 7 ~ ~1 43 E 109Q,00 '] S 11 4~ ~ 1174,13 47 38 ~ 11 39 E 1240.30 47 1 S 11 49 E 1321.68 46 30 S 11 5t E 1394,53 46 3l ~ 11 30 E 1467.~6 46 24 $ 11 lO F 1539,61 46 20 $ 1.1 q E 16J. 1..94 46 13 $ 11 ~ K 1684.~0 4.6 0 .~ 10 41E 1756.73 45 50 ~ 10 33 E 1~2~.05 45 29 $ 10 27 F 109q.54 PAGE 1 DATE OF SURVEY) 05 OCT 85 KELLY BUSHING ELEVaTION) E~GTNEE~t HALFACRE Of MEASURED DEPTH KG /100 0.00 0,23 0,06 0.31 0,20 0.13 2,42 4.17 5.77 3.5? {,18 3.87 4,92 4,77 5,4q ].74 4,50 4,37 4,4~ 4.81 81.00 FT 0.73 0.37 0.1~ 0.17 O,4B 0,20 0 21 0~31 0 13 0~17 0,80 0,4] 0.21 0.37 0,25 0,07 0.23 0,20 0.31 0,27 RECTANGULAR COORDINATES NnRTH/SOUTH E~ST/WEST FEET FEET DXST, FEET DEPARTURE AZIMUTH DEG MIN 0,00 N 0.00 E 0 0.12 S 0,27 W 0 0.17 S 0,84 W 0 0.16 S 1,43 W 1 0,16 S 1,75 W 1 0.34 S 1,75 w l 0.61 S 1,47 W 1 1.02 N 2.90 E 3 3.93 N 13.18 E 13 0,75 S 24.86 E ~4 ,00 .29 ,85 .44 .76 ,79 ,59 ,08 ,76 ,87 N 0 0 £ S 65 28 W $ 78 21 W S 83 32 W S 84 38 W 879 6 W S 67 22 W N 7O 35 F N 73 24 E S 8~ 16 E 11.37 S 34,43 E 36 27,90 S 45.40 E 53 51.29 S 56,25 E 76 82.32 S 65.99 E 105 120.86 S 77.84 E 143 167.24 $ 09.43 E 189 2~9.46 $ 99.37 E 240 276,40 S 112.84 E 298 338.51 S 130 30 E 362 406,43 $ 147~31E 432 ,26 $ 71 43 E .37 S 58 28 E ,12 S 47 38 E 50 S 38 42 g 76 $ 32 46 E 65 $ 28 8 E 91 $ 24 21E 55 $ 22 12 E 72 $ 21 3 E 31 $ 19 55 E 479,71 554,15 6~8,16 70~.89 775,51 848,86 921,99 99.{,94 1067.~6 1140, 3 163 20 E 179:15 225 82 241 256 96 E 272 37 28 05 · ~0 506 72 657 69 8O7 882 51 95? I2 ,90 ,30 S 18 47 E $ 17 54 E S 17 14 g $ 16 40 g $ 16 14 E $ 15 52 E $ 15 34 E S 15 18 E/, 5 15 4 E 814 SI E 1213,41 1.285.35 1356,73 1427,89 1498.96 1569,96 1640,86 1711,68 1782,30 1.852.61 317,B1 E 1254 3,32~.j,~ K 1327 E 1400 £ 1545 391,15 E 1617 405,I0 ~ 1690 418.69 E 1762 431,92 E 1833 4a4.94 E 1905 34 70 58 22 66 95 13 89 ,29 $ 14 40 E $ 14 30 E $ 14 22 g S 14 14 E 814 7 E 3 59E $$ 13 52E $ 13 44 E $ 13 37 E S 13 30 E ARCO ALASKA, TNt. 3J-4 KI.IP~RUK NORTH SLOPE,AI.A~KA TRUE DEPTH DEP?H C~HPUTATION DATE: 4-NOV-R5 PAGE DATE OF SURVEY1 05 OCT 85 KELLY RUSHYNG EbEVATYUN: ENGTNEER: HALFACRE Ig'CFRPOLA'PED vAI. UFS FOR EVE.~ 10o FEET OW MEASURED SUE-SE DEPT 4000.00 3197.9o 3116. 4100.00 3269.07 318~. 4200.00 ~341.15 3~6~. 4300.~0 3413.80 3~3~. 4400.n0 34~6.54 3405. 4500,00 3559.28 347~. 4600.00 ~6~2.5~ 3K51. 4700.00 3705.80 3624. 4~00.00 ]77~.76 3697. 4900.00 3851..[2 3~70. 5000.00 3923.50 {847. 5~00 O0 3997 04 3o16. 5~0~00 4070191 3~8~, 5300.00 d144.93 4063. 5400,00 42~9.3~ 4~3~, 5500o00 429~,19 4213. 5600,00 4369,J5 478~, 5?00,00 4444.4~ 4363. 5800.00 4517.83 4436. 5900.~0 4590,31 4509. 4662.44 4734,8~ 4807,56 48RO.5R 4953,94 5027,58 524'4, 5316"~95 5' '~, ~i,~ 7 56 5756~90 58~i,5~ 4581. 4653. 4726, 4790. 487?. 4946. 5020, 5091, 51.63, 5~3~. 5308. 5~81. 5454. 552~. 5601. 5675. 5750. 5825. 5900, 5~76. 6000.00 6100.00 6200,00 6300,00 6400.00 6500,00 660O,00 6700,00 6800.00 6900.00 7000,00 7100.00 7200,00 7300.00 7400.00 7500,00 7600.00 77og:oo 780 oo 790~.~0 DEPTH .~ CnUPSE VERTICAL DOGLEG RECTANGULAR Al.. DEVTATInN AZI,U?H SECTIDN SEVERITY NORTH/SOUTH O0 44 54 $ 1.0 23 E 1970.57 0,95 1922.40 07 44 16 S ~0 23 E 2040.80 0.99 1901.59 15 43 34 ~ 10 20 E 2110.09 0.55 2059,77 ~0 n. 3 13 g 10 18 E 217R.79 0.85 ~127.37 54 43 29 S 10 4~ E 2247.39 0.16 ~194 84 28 43 4 ~ 10 55 E 2315.a8 0.70 2262:24 58 42 46 S 9 25 E 2383.98 1.47 23~9.~4 RO 43 3 $ 8 46 E 245~.o9 0.33 2396.44 76 43 1~ S 7 54 F 2520.47 1.56 2464.06 12 43 50 $ 5 2a E 258e.42 0.52 2532.6] 50 ~3 q S 4 16 F 2658.76 2.50 2601,35 04 42 26 $ l 59 E 2725.60 0.56 2669 02 91 42 20 S 2 17 E 2792.50 0.50 2736~38 93 42 4 $ 3 11 E 2859.33 (I.85 2803 54 ~8 41 44 S 3 46 E 2925.78 0,22 2870118 19 41. 23 g 4 10 E 2991.88 0.55 2936,38 35 41 ~ $ 4 56 E 3057.63 0,57 ~002,13 48 42 3 S 4 16 E 3123.46 2,7~ 3067,88 R3 43 5 ~ .~ 39 E 3191.13 0,38 3135,71. 31 43 53 S 3 5O E 3~59.71 0,46 3204,44 44 43 44 ~ 4 36 E 332~.73 0.55 3273,52 82 43 30 S 5 9 E 3397.56 0,54 3342,28 56 43 1~ S 5 52 E 3466.04 0 36 3410,57 58 42 59 S 6 25 E 3534..~8 0:48 3478,50 94 42 '$R $ 7 2 E 3602.19 0.62 3546,00 58 42 32 S 7 51 ~ 3669.81 0,93 3613,09 06 43 17 ~ '1 0 E 3737.62 2.82 36R0.27 03 44 16 $ .5 5! E 3807.05 0,68 3749,41 75 43 55 $ 5 I E 3R7fi.52 1.85 3818,64 05 43 4~ ~ 4 21 E 3945.48 0.35 3887.63 5906,40 59~1.73 6057.3? 81.00 FT 36 43 17 $ 4 51 F 4014.24 0.60 3956 37 43 0 g 5 29 E 408~.4.1 0,42 4024 63 42 44 $ 6 ! E 4150.37 0.58 4092 ~3 4.2 37 ~ 6 3a ~: 421~.09 0.39 4159 R0 42 25 $ 7 11 E 4285.6'7 0.67 42~6 90 41 56 S 7 46 E 4352.79 0.4'7 4203 51 41 34 ~ 8 q E 4410.37 0,26 4359 40 4.1 2:1 $ 8 37 E 4485,63 0.7? 4424 73 40 59 S 9 6 E 4551,40 0.23 4489 32 40 48 ~ 9 2~ E 4616.~7 0.43 4554 ,38 S 42 S 15 $ 53 S 67 S 24 $ '18 $ :75 S 7! S .34 $ COORDINATES HORIZ, E~ST/WEST DIST, ~EET FEET DEPARTURE AZIMUTH DEC NIN 457,83 E 1976,25 S 13 23 E 470.46 E 2046.40 S 13 17 E 482.98 E 2115,63 $ 13 11E 495,27 E 2184,26 $ 13 6 E 507.76 g 2252.81 $ 13 1E 520,68 E 2321.39 S 12 57 E 532,96 E 2389.34 S 12 53 E 543.50 E 2457.29 $ 12 46 F' 553 63 ~ 2525,49 ~ 12 39 L 561:47 F 2594,12 S 12 30 E 567,66 E 2662.56 570,93 E ~729,40 573,33 E 2795.80 576.51 E 2862,21 580,66 E 2928,32 585,21 E 2994,13 590,43 E ]059,64 596,16 E 3~25.27 600,53 E 3 92,69 604,97 E 3261,05 610 05 E 3329 615:9! ~ 3398 622,57 E 3466 629.89 ~ 3535 537.86 E 3602 646 53 E 3670 655 663 670 675 88 56 92 07 91 48 80 E 3738 25 16 E 3807:60 17 E 3877,00 41 E 3945,87 ~ £ 4014,56 E 40~2,66 t~ E 4150.58 E 4218,26 60 E 4285,83 37 E 4352.1; 61 E 4419, 20 E 4485,74 49 E 4551,51 99 E 4616.9~ 718 757 $ 12 18 E $12 4 E $ 11 50 E S 11 37 E 311 26 E S I 16 E SIX 7 g $ 0 ~0 E $ I0 59 E $ 10 41E S 10 33 E $ 10 26 E S 10 20 E S I0 15 E S lO 11 E $ 10 8 g $1 0 6 E S 10 IE' $ 9 57 E~'' S 9 51 g $ 9 45 E $ 9 £ S 9 34 E S 9 31E 9 29 E $ 9 ~8 E $ 9 27 E $ 9 ~7 E $ 9 26 E COMPUTATInN DATE: PAGE ] A~CO ALASKA, TNC. 3J-4 KUPARUK NORTH SY.OPE,AI.A~KA DATE OF SURVEY: O5 OCT BH KELLY BUSHING ELEVATION: ENGINEER: HALFACRE 81,00 FT INTFRPOf,ATED VAI, UFS FOR EVE~] 300 FEgT OF ~.EASI!RRD DEPTH TDUE MEASURED V~RTICA DEPTH DFPTH L VERTTCAL DEPTH COURSE VERTICAL DOGbEG R~CTANGUI, AR COORDINATES DEVIATION AZINUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DEG ~TN D~G MTN FFET DEG/100 FE~T F£ET HORIZ, DEPARTURE DIST, AZIMUTH FEET DEG MIN 8000.00 8100.00 6208.8 8200.00 ~284.0 8300.00 6358.2 8400.00 ~431.2 8500.~0 6503 8 8544.00 6535~7 605~..96 6127.R2 6203.n2 6277.28 6~50.28 6422.R6 645a,79 40 46 ~ 9 33 E 4682.28 0.39 461.8.84 S 768. 40 47 S 9 44 F 4747.43 0.75 4683,07 S 779. 41 38 S 9 5~ E 4813.33 0.65 4748.02 S 790, 42 30 S 8 47 E 4880.30 2.1o 4814.04 $ 802, 43 27 S 7 2 E 4948,63 0,00 4881.81 S 8il. 43 27 S '7 2 E 5017.38 0.00 4950.08 S 819. 43 27 S 7 2 F 5047,63 0.00 49R0,12 S 8~3. 85 E 4682 39 $ 9 27 E 80 E 4747:55 $ 9 27 E 96 E 4813.45 S 9 27 E t9 E 4880 42 S 9 27 E 16 E 4948~74 S 9 26 E 59 E 5017,48 S 9 24 E 30 ~ 5047.72 S 9 23 E COMPUT~TInN D~T~: 4-NOV-~5 PACE 4, A~CO ~bASKA, TNC. ~J-4 KUPARt~K NORTH SLOOE,A[,ASK~ DATE OF SURVEY! 05 OCT 85 KEbLY BUSHIN~ Eb~VATION: ENGINEEr: H~LFACRE t~l.OO PT INTF.RPOf.,ATEP VAt, UWG FOR EVEN .1000 FF'ET OF MFASURED DEPT T~UE SUB-SEA COURSE MEASURED VFRTlmAL VERTICaL DFVlATION AZIWUTH DEPT~ D~PTH DEPTH D~G ~IN DEG ~TN VERTICAL DOCLEG E~CTANGULAR COOrDINaTES HORIZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/~O0 FEET FEFT FEET DE~ MIN 0,00 0.00 -8~.00 1000.00 997.40 916.40 9 46 200~.00 1545.3~ 1764.]2 49 34 ]000.00 ~506.91 2425.~! 47 4000.00 ~197.90 3116.~0 44 54 5000.00 ~973.50 3~4~.50 43 6000.00 4662.44 4581.44 7nO0,O0 53R9.36 5~U~.36 43 17 ,ooo.oo 8544.00 6535° ,7 ba54.79 43 27 0.00 16.64 499,41 1249.30 1970.57 265~.26 3328.73 4014.~4 468~.~8 5047.63 0.00 0.80 0,95 2.59 0.55 0.6q 0.3q 0o00 0,00 N 0,00 E 0.00 N 0 0 E 11.37 S · 34.43 g 36,26 S 7! 43 E 479,71 S 163.20 F 506,72 S 18 47 E ~233.41 S 317.8] F ~254,34 S 14 40 E 1922.49 S 457.83 E ~976,25 $ 13 23 E ~60~,35 S 567,66 E 2662,56 S 1~ ~8 E 3273.52 S 610.05 E ]]29.88 S 10 ]3 E 3956,]8 $ 680.95 E 4014,56 S 9 45 f' 4980.12 $ 823:30 E 5047,7~ S 9 23 E C~MPU?ATION DAT~: 4-NOV-85 PAGE 5 ARCO ALASKA, THC. 3d'4 KUPARUK NOR?H SLOPE,ALASK~ DATE OF SURVEYI 05 OCT 85 KELbY RUSH]NC ELEVATION: 81,00 rT I~TERP[]~A?ED VALUFS FOR EVE" 100 FEFT Or SUB-SEA DEPTH TRUE SUg-SEa COU,SF MEASURFD VFRTICAL VE~TTCAL D~VTATION AZIMUTH DEPTH DFP~H ~EPTU DEG ~IN DEG VERIICAL DO~LKG RRCTANGULaR COORDINATES HORIZ, DEPARTURE $~CTION SEVEriTY NaRTH/SOUTH E~ST/WEST DIST, AZIMUTH FFET DEC/100 FE~T FE~T FEET DEG 0.00 0.0~ -Si.q0 0 0 N 0 0 ~ 81.00 gl.00 0.00 0 19 ~ 66 55 W 18~.O0 1~I.00 100.00 0 20 S 88 1 W 281.00 2R1.00 200.00 0 19 N Rb 43 W ~81,00 3~1.00 ~00.00 0 8 $ 82 R W 481.01 491.00 400.00 0 R $ 14 28 E 581.01 5~1.0~ 500.00 0 26 S 67 10 ~ 681.08 681.00 ~00.00 4 q ~ 65 ?0 F 781.61 7~1.00 700.00 6 40 N 83 14 E ~82.41 8~1.00 ~00.00 7 30 S 57 3~ F 0.00 0.00 0.00 ~ 0.00 E 0,06 0.32 0.09 S 0,17 W 0.05 0.09 0,17 S 0.72 W -0.04 0.1R 0.17 S 1.33 W -0.12 0.34 0.15 S 1,71W 0.0! 0.14 0.29 $ 1,76 W 0.t4 2.83 0.61S 1.68 W -0.!1 5.34 0.36 N 1.5~ E -2.06 5.48 3,84 N 1.1 02 E 3.05 3,91 0.57 N 22~97 E 0.00 N 0 0 E 0,19 S 62 26 W 0.74 $ 76 46 W 1.34 $ 82 47 W 1,72 & 84 53 W 1.79 $ 80 40 W 1.79 $ 69 57 w 983.37 9~1.0o 000.no 9 6 1085.25 ~0al.00 lno0.n0 12 33 1188,54 11"1.00 1100.00 16 26 1294.12 1281.00 l?OO.00 21 4 i403 ,37 1381.00 1300.00 2b 24 4oo.oo 06 ,6, ,oo 6oo.oo ,o 190~fi8 1781.00 1700.00 46 47 2055.~1 1881,00 1.~0o.00 49 34 37 37 E 14.24 4.30 31 57 E 31.71 3.63 20 53 E 56.~4 5,0~ 17 R E 89.6.3 4.71 15 56 E ]33.08 5,47 11 14 E 18~.44 3,32 1247 E 253.38 4.96 1,5 4.4 E 331.06 4.53 12 30 E 426.51 4.77 12 4 E ~41.36 0,40 9.19 8 32.79 E 34 06 $ 74 20 E 25.13 S 43.7, E 50 48 S 60 8 E 48.17 8 55,14 E 73 22 S 48 51 E 80 35 S 65.39 E 103 59 S ]9 8 E 122:30 $ 78.26 E 145 19 S ~ ~6 E 176.29 S 91,18 E 198 47 S 2 0 E 240.05 $ 103,76 E 261 52 $ 2~ 2 E 315 51 S 1~3,83 E 338,~4 S 21 25 E 408:35 S 147.73 E 434,,5 S ~9 5~ E 520,78 S 172,01 E 548,45 S 18 i6 E 220~ 28 1981.00 lq00.O0 48 53 2360~23 2081.00 000.00 48 46 2511 53 2101,00 2100.00 4.8 29 2661~9 2201,00 2~00.00 48 12 2811'79 2381.00 2961,43 2481.0n 3109 14 2581,00 3255: ~ 5 2681.,0o 3400.48 2 78 i,',,, O0 3545,36 '28{'41i00 4116 4254 4392 4529 2300,00 48 6 2400,00 47 54 2500.00 47 0 2600.00 46 3~ 2700,00 46 24 2800,00 46 16 3689 02 3076, 4116. 4254,89 4392,36 4529,?0 4666,09 4803.08 ;:," , ,,:00 2qO0, ',,;il;~i";: ~, :",,~'0 3000, O0 45 42 "¢ "~ 0 3100.00 45 6 .;':.'i:i.;: 0 3~00,00 44 i:~i:':} -~ S t i:',~ 0 3300,00 43 23 e~58 .*O0 3500.00 42 55 3781.00 00 3600.00 43 0 3700.00 4.3 20 4941.41 3801.00 3~00.00 43 41. 11 5? E 657.22 11 53 E 771.50 12 3 E ~84.89 11 55 E 997.03 ~1 43 ~ 1108.57 11 45 E 1~19.7b 11 51E 1328,35 11 5n E 143.4,60 1.1 lq E 1539.06 11 ~ E 1644,72 $ 10 43 r 174~.91 S 10 30 E 1857.06 S 10 25 E 1953.64 S 10 24 E 2052.41 $ 10 17 ~ 2147.83 $ 10 40 E 224~.1.) S 10 ~4 E 2~36.23 S 8 49 E 242~.96 $ 7 50 E 2522.58 S 5 13 E 261P.03 0.14 0.16 0.19 0,10 0,11 0,59 0.31 0.30 0.25 0.20 0.25 0,46 0.87 0,96 0,1~ 0,23 1,00 0,08 1.68 0.70 634,27 S 196 13 E 6~,90 S I~ I0 E 746,24 S 219 65 E 7 ,89 857,31 $ 243 18 E 891.13 $ 1~ )~ E 967,14 S 266 52 E 1003. 9 $ 1 E 1,076,46 $ 289 33 £ 1114 66 $ 15 2 E 1185,44 $ 312 01 E 1225:81 1291.89 $ ~'03 E 1334;37 $ 14 29 1602.14 S 97;49 E 1650,72 S 13 56 E ,~.,,, ',,,:1t"}" '""" o, =os ioo ~096 90 $ 48 ::.::3 E 2153 33 S 13 8 g ~189 68 8 ~ ":78 E 2247 ~ $ 13 i g 2282 13 8 ~.52 g 2341 $ 12 5 g 2373 58 S 53~95 E 2434,22 S 12 48 ~466.15 $ 55 92 E 252?.60 $ 12 39 E 2561.17 S 564'12 E 2622.56 S 12 25 E ARCO ALASKA, TNC. 3J-4 NORTH SLOPE, A~,ASKA ~EASUREO DEPTI4 507~.25 521 .&6 534;.51 548 .43 5615.46 5749.R2 5887.06 6025.67 6163.55 6300.57 6436.76 657~.56 671 ,29 6850,27 6988,50 6~.75 739 ,57 7532.37 7666.11 7799.04 7931.30 8063,34 8195.96 8330,q0 846~,51 8544.00 COM'PUTA~IDN DAT~= INTERPOI,ATED VAI.,U~$ FOR EVEN TRIJF S[JR-SEA COUgS~ VERTICAL VErTICAl, DFV?ATION AZIMUTH DEPTH DEPTN DEG MIN DFG ~N 39Pl.00 3000,00 42 2q R 2 4 ~ 40ill.00 4000.00 42 19 S 2 23 E 41R1.00 4100.00 41 53 $ 3 33 E 42~1.00 4~00,00 41 26 S 4 ] E 4381.00 4300.00 41 7 S 5 2 ~ 44~1.0~ 4400,00 42 51 K 3 38 ~ 4581.00 4K00.O0 43 53 R 3 45 ~ 4681.00 4600,00 43 42 S 4 45 ~ 4781.00 4700.00 43 16 $ 5 40 E 48~1.00 480n.00 42 59 S 6 25 E 4981.00 4q0o,00 42 37 S 7 14 F 50~1.00 500n.00 42 47 S 7 41 ~ 51~1.0o 510A,00 44 15 S 5 54 F 5281,00 5200.00 43 46 S 4 15 E 5391.00 5300.00 43 22 S 4 4~ E 54El.On 5400.00 42 5~ S 5 3~ ~ 5591,00 5500,00 42 40 S 6 27 E g681.On 5600,00 42 26 $ 7 10 F 5781,00 5700.00 4J 49 $ 7 54 E 5881.0o 5.0~,o0 41 20 S 8 23 E ~9nl O0 5900,00 41 0 K 9 7 ~ 60~:0o 6boo.oD 40 51 s 9 3~ ~ 6181 OD 61.00,00 40 37 $ 9 43 E 62R1:00 6~00,00 41 37 $ 9 b~ E 6381.00 6300.00 42 55 ~ 7 48 E 6481,00 6400,00 43 27 S 7 ~ F 6535,79 6454.79 43 27 $ 7 2 E 4-NOV-B5 PAGE DATE OF SURVEY! 05 OCT 85 KELLY BUSHING EbEVRTIONI ENGINEEP: HALFACRE 100 FEET OF SUB-$E~ DEPTH VERTICAL DOGLEG RECTANGULAR SECTInN SEVEPlTY NORTH/SOUTH F~ET DEC/100 FEET 2711.02 2801.64 2891,60 2980.32 3067.77 3156,91 3250,77 3346.42 3441.12 3534.67 3627,05 371R,89 3~14.93 391J.73 4006.37 409~.75 4197.19 4284,03 6374.40 4463.~9 4550.77 4637.33 4723.K4 4~1n.64 490~.24 4995.73 5047.63 COORDINATES ERST/WEST FEET HORIZ, DIST, FEET 0.69 2654.34 0,57 2745.57 0,50 2835.92 0.56 2924.81 0.43 3012.26 1.02 3101.39 0,37 3195 49 0.28 3291:20 0.55 3385.74 0,49 3478.89 570.44 573.71 578.45 584,37 5ql.33 598,38 604.37 611.51 b20.05 629.93 81.00 FT 0,77 3570.68 2.03 t661,70 0.86 3757.27 0,54 !853,36 0.77 3948.5{ 0.44 404i.71 0.47 4133,78 0,67 4225,04 0.44 4314,65 0,47 4402,56 640 653 663 672 68O 6~8 698 709 721 733 .94 .41. ,86 ,30 82 ~51 .32 ,89 DEPARTURE AZIMUTH PEG MIN 0.23 4489,09 $ 747 0.29 4574.51 S 761 0.43 4659.53 $ 775 0.60 4745"37 $ 790 2,90 4834 77 $ 805 O.O0 4928:58 S 816 0,00 4980.12 $ 823 ,39 .38 .74 49 °30 2714.94 S 12 7 E 2804,87 $ 11 48 E 3069,75 S 11 6 E 3158,59 S 10 55 E 3252,14 $ 10 42 E 3347,53 S 10 31 r 3442.04 $ 10 22 · 3535,46 $ 10 15 E 3627,75 3719,54 3815,48 3911,67 4006.69 4099 99 4284,~8 4374, 3 4463'31 4550.88 4637 44 4723 66 4810 76 4995 5047 72 $ lO 10 E 310 7 E $ 10 I E S 9 54 E $ 9 46 E S g 40 E $ 9 35 E $ 9 31E $ 9 29 E S 9 27 E 9 27 E 9 26 g 927£ 9 27 E 9 27 g 9 24 E 9 23 g ARCO ALASKA, INC. 30-4 KUPARIIK NORTH SLOPE,At, A~K~. MAr~KF.R TOP KIIPART~K C BASF w, tIPA~UK A PBTD COMPUTATInN DATE: 4-NOV-~5 : I~TTER~D,~,ATEn VA[,UFS FOR CMOqEN HOPI.?,ONS ORTGTN: 815' MEASLIREO ~EPTH TVD ~Et.,OW KB F~O~ Kl~ SUB-SEA 791.0.00 6064.B9 5993 80 7975.00 6114.0~ 6033:04 8117,00 6221.68 6140,6R B274.00 6339.~7 ~2~8.07 ~417.00 645~.13 ~377.13 ~544o00 6535.79 &454.7~ PAGE DATE OF SURVEY! 05 OCT 85 ENGINeEr: HALFACR£ 81.00 FT FSL, SUPFACE LOCATION 564' FWd, SEC 3. T12N. RgE~ R~CTANGU~AR COORDINATES NORT~/SOUTN EAST/WEST 4560.77 S 759,06 g 4602.72 S 766,14 E 4694.02 S 781,67 E 4796.76 S 799,3B E 4907,07 S g14.27 E 4o80,12 S 8233. 0 E UM 3J-4 TOP BASF Trip BASP Tn KI,PARIIK C KI.IPARUK C KUDA~!IK a CnMPU?ATION D~T~J 4-N0¥-85 DATE OF SURVEY: 05 OCT B5 KEI.bY RUSHING EbEVATION: ENGINEER: HAbFACRE ************ STR~TIGRAPH?C $[YM~ARf ************ 91.00 FI~A[, wD;T,L L('ICATTO~ AT TRU~ SUR-~E~ MEASLIRED VrRTICAt,, VERTICAL DEPTH DEPTH DEPTH ~544.00 0935.79 6454.79 M~ASURED DEPTH REI,DW KB FROM ORTGTN: ~15' FSL, KB SUR-SEA SUE 564 ' Fw6 RKC?A~ NORTH FACE LOCATION AT SEC 3 T!2N R9£, GU6AR ~OORDI~A?~$ /SOUTH EAST/WEST 7910.00 6064.89 5983.89 7975.00 61.14.04 6033.04 Ell7.00 6~2~.6B 6140.bE R~T4.t)~ 6339.07 6258.07 R437.0n 6458.~3 6377.13 R544.00 5535.79 6454,7° 4560.77 $ 759.06 460~.72 $ 766,~4 4694.02 S 7BI.67 4796.76 S 799.38 4907.07 S g14.~7 49B0.~2 $ 823.30 HORIZnNTAL DEPARTURE DISTANCE AZIMIITH FEET DFG MTN 5047.72 S q 23 FT UM SCHLUMBEROER O I RECT I ONAL SURVE'Y' COMPANY ARCO ALASKA I NC B-2 WELL ~d-4 FIELD KUPARUK COUNTRY USA RUN ONE DATE LOOOED REFERENCE 0000709~4 WELL NAME: 3J-4 SURFACE LOCATION: 815' FSL, 564' FWL, S3, T12N, R9E, UM VERTICAL PROJECTION - 10~ 0 0 1000 ~ ~ 4000 , . ~ -,-?.-~...~ ,.., 190, .~..~.~...~..~..~..~ ........ ~ ~ ;..~.. L..;..~ ~ ~ ! : : : t : .... · ~.: ....... ...LLL.L.i..i..L~.~ :i i ......... ' ' ~ ' ' ! ! ~ i'~';'~ ..... ~'t' · · ..:.:,....i..;..:..~ ..... ......... . ........ --*..?-.?--?-.t..?-- .~-,..?.. ...... : : : : : . : ...... .... ...~.~-4--.~ ~!~ii-~-.: ~.. ~.~,' ;;" .iil;:];il;]l];];];] · ';."+'.~.' 4-~-~-'."-~'_..~_~. ?~+.kf.i_i.' ":"~-.~+'~"~-.~'~-~'-'"'?!..?'--+.-t-.?'..+.:-+-.: : : : ~.;_~.,..~..~..;. "~--*-..~..~.+-~--??.?. .................. .. L..~..$..~..Li.4., ................. ~ .~...;..+..;...!.. ;..~... : : : : : · .i....:,.4..i-L.~-..~...~-i.- ; ..... ': .~..~.4..~ r'?' ~-'~ ..... ;-~ ...... ;.--.~.:..~...:...!.--.-.~. ?.~-.~..L.'..~..-..: ~..;..:..L~..~..;..~.. · '~"~"~'"+-- ~ ..'~..-~.-'~.- . ...... .--.~..g-..~.~....$.4-4..~... ~;: ..... · ........ '?":"?'":"? ...... ·: .. ...... ".~-+"k~'i'~-?m~--.~.-..;-.~--r~-.~--.?..r~:~ ..~.;...; i.. ~ : : : : · '; .... ' ...... ..~ ':~ i..i..i...i...]. ........ ~'?' ..+..:..~.~.~..:..~..~~' .... ..?..,...?:..~..;..;..;.. -.~..i.- :~.~-.i--.~..~: .. ' ..... ' .... ..- .~-~-~-~..t-.~- '?-~-~ - .~.;..;..;..I.., ....... ;--.:...~..~.~..~-.~_+..:.. ......... ..... i iiiiiii~ :,: : ; : : : : '"r".."T'"..'"?".T"??"?'"'"?--r'~'-w'l-?--?"' ....... ~ ' ~... L..~ " · · ' ~'"~ i'" ...... ..''r';''';' ''t ..... :....'...!..:.: : .' I :,. L.:...t. Li '..;.~ ' ~..~...h L: ....... L L.i..] ' : . ~ . L..~..~ .... ;...: :,..'...:. · ..;..,.4- .... -~-,.. ]~ ..... ' ....... ,.~...~?..~_?~...:.. :: ....... ..4--~-.~-~4..4..i..;..: ....~.~..~-.~-..~~ ~.+..+..+.. : ; : : ~ ; : r : : : : : : : : : ; ......... · -f--?'-.!--f--+-.!--? ..... i...~...~.....'..~..{..~..,} ..... · ..... ...i...~..,:..,..i..,..,~..i..~.. · ...... i..J....:...;...~.. ......... ..~..~..~..~.+..;...~.,....f ..... ;..;.;..,..,..~..~.;.4... ' .... : : : : r : : : : · . . ; : ; : : : : ; : ; : : : : . . : : ..... .... --.~.---:,..-b--:...4...:...'... . .. . .~ .... ' ' ' !..;..~..~..:-.~..!...i ..... .:--!..?--+ -~ .... : ·: ' ': .-?.-.--.~-.r-.~ ..... ; ............................ ].--~.-~..~...~..~.-;....; --';4-.~~~--i--~, ..... ;..+-.,:~..~..~ ..... · ...-:..,..,..;..i..~..;..~..~ ........ ~..,..~..,.~ ...... ~..;..:..~..~..;..,..~..;... 'i ' · .4...~..~..,.. '..~-e.-~..~.. ~ : : : ~ : : : : ..... ~...::....?...r!..; : i ........ ~ .... ?''~'"~"~ ...... ~'"~''~"~"~'":''~"--:''~'":'":'"~"~ ...... : :'~ ..... ' .... ' ~ ~'"'";"? .... -~";' ;"iLZ :'''~-~, -"~" ~''~''! ;'".-":' ~''~' '--'~"j'"!' !' :'+' .... !...~i;'~;;.!;:i];c;] !i"!';~c;'~; · .. t--t'- --.~-? ..... t" "~'T + .......... '"""'*"'"t" ...... ~''" "' .... ~"~--" ....... +"'*"' ........... ~ ........+"~ ....... +"+"'"' ........ +"*"t"+"~- .........;"~"'-"--*-,-'*--,-;-- '~: i! ~.TM !;~ i~ii:, i~::~i!!~ . : i : : [::~: ~-~ ~:i: :~i,~ :; ' ~ : ~ .::: i...:..;..~.....:....;, s...:..~...~ .; .:. ~, }: ..;; .... :...'.-,...;...:...L.L.:...i ...... L.t.:..i...!..i..t..;..t.L.i...:....L.i..i..i..i...!..Li L..!.; L..:. "?"?"?'.?".~' ~"~ .... ." ~'? ?)"' .... ~ ..... i'-; '~ .... ' ~":-'-'-~'-'"~"~ '? ..... c":' ! ~' >': ...... ~., ;..-.: ...... :..~ :-.~ .... ? . ...-. i..~. ~ .. , ~ ....... . :..~ .... i..~.. · .~..-*...i..-~..~...~..4. .......... ~..~..-;,...i...-J,...,...:...~..-,..~....?..~...,....,..+--.~.~.4--.,,-..-.-,..-,..-,..~..+.-,.-.;,..~..?..~I,..~.--,..~-.~...$..~...?..,..? ......... 4. f ...... t J' ........ ~";'"4. ~' "~''[ ' ~ : ' ' .... ~ : : .'~.', .................. ~ .... +~ .............. t ................ ? ? ?' :"'?"'"?"?" , ~:~T 3-~r[-~.. ........................... ~..-4. ............. ~ ...... ~...~..~.. ~..4. ...... ~.. ~...L.~..:,...~..~..~.. ~,..4...4...,..~..4...~...~.. L. "~>?".?'; ....... f_:"'m"; ..... rim?' I"m ...... ~ ..... ~ '?m"?";";'"'"E? .... I ;":"m" "r"r:"~.'i" :''? ..... ;'T'?"m ........ I m' ~'--;-:' m"~ ......... i f ..... ;' ?'''''''?';'';''l''m''m''f'''~''~'' ;-' l": ':'".-'i"'.'." "~'.?":"-.Y" "?":"?'"?":"~:'-?"?" '?"?"?"?" :"T"?": ~ .... ~'~TT'f"T"T": ~': ' "r't"i'.."?'."t"?"?"~" "?"T'?"T"t"?"?"T-?" "?"?'"~"'F"t"!'"??"~" --?-?..?-.?-~.-.t-.,~.-.~-~.-. ~-.~..~--+.-:'.-~.+-~.-~.-: ...... !-+-~--.:-'.-!--?"--~..:--;.--k~---!..;~..~.`~.~i.~k?.:~.;~4.~i`?.:...i..~.~;..k~.?..'~;~..~..~..:~...:~:.+.;.` : : i ; ~ ! : : i : : : : ~ : .... : : : : · : ; ~ ...... : : - : : · : . ; : : : ; : : :'. ':"' ..... :".'":".":"~":"?" "?"'?"?"~"."?"?"?"?'" , ............................. ..~l.e,.n. rn~: ..~ ....... .). ........ .;,..: .~ ,_J~...~...;..4. 4. $ .~.~...:. :,..~, .... 4. ....~ ;..;, .- ~ ).; :., ~ .... . · ... ........ :.~!:!:.:!! !]~ . ii ~ : i:;~:~ ~,:;:::~;i~:,. i:~: :. ": .... ; ..... ?'7"7":'"[":"?":"-'T"7","T"Z"t ii.... ..... .... +.-:..;......:..;? ] u, i ....... - :. : ~ : : : i : t: ~ ~ i ; : i i i }: i i .... ! i ~ ~ : ~ :. : : . : ~?'~ .... :"'": ..... ,,'"? .... 7 ..... ~ .... ? ........ ...... ? ..... ,""?": ........ .`.. .............. t'"'"='?"'":": ......... PRO,,E:CTI~', 0;~ VF_.RT;C~:tl.. PL~AZ 170, - ~0, ,~,..qLEO IN .'CltT)CI~ DEPTHS MOR]Z SCI~..E ~- ;, 10OO 'N,'FT WELL NAME: 3J-4 SURFACE LOCATION:: 8'I5' FSL, 564' FWL, S3, T12N', 'R9E, UM Suggested form to be inserted in each "Active" well folder to check f or - timely complia'nce~ith--our~regutat ions. OPERATOR, ~gL-I ~NAM~ AND NUMBER Reports and Materials to be received by: /~--/~'~'~ Date '' Required Date Received Remarks Completion Report ~y.~..~ ~~. ~ Samples Mud Log Core ChSps C6r~ 'Description Registered SurveY' ~~-~ " ' .... ~re~o~ Survey ~. -~:- /~-~~ ~:~ . Drill Stem Test Reports , , ..... ~ ~ - _ , L.FJ.04 ARCO Alaska, Inc. Post Office B,.,x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 DATE: 11-i3-85 TRANSMITTAL NO: 5442 ~TURN TO: ARCO ALASKA, INC. KUPARUK OPERATIONS RECORDS CLERK ATO-1115B P.O. BOX 100360 ANCHORAGE, AK 99510 ENGINEEKING ~qSMITTED HER.EWITH AP,.E THE FOLLOWING ITEMS. PLEASE ~CEIPT AND RETURN ONE SIGNED COPY OF THIS TRANSMITTAL ~IN~S / SCHL/ OPEN HOLE/ ONE * iNAL ~-7 5~ DIL/SFL-GR ~ DIL/SFL-GR ~.5"'~ DEN/NEU k 2"~ DEN/NEU ,~ 'C DEN/NEU 'q\DEN/NEU \ 'CYBERLOOK PORO PORO RAW RAW ACKN OWLED GE · OF EACH 10-09-85 }{UN ~1 1750-7564 10-09-85 RUN ~1 1750-7564 10-09-85 RUN ~1 69 00-7538 10-09-85 RUN ~1 6900-7538 10-09-85 RUN #i 6900-7538 10-09-85 ~UN ~1 6900-7538 10-09-85 RUN ~1 6900-7515 J-6 7-4 DIL/SFL-GR !0-02-85 RUN ~1 DIL/LFL-Gk 10-02-85 RUN ~1 "-5~ DEN/N'~:U-GR PORo 10-02-85 RUN ~1 '~2~' DEN/NEU-GR PORO 10-02-85 ~UN ~1 '"5'7- DEN/NEU-GR i{Aw 10-02-85 }{UN ~1 ~.2"~ .-,xDEN/NLU-GR P~A%~ 10-02-85 RUN ~ 1 ky,5''~ DIL/SFL-GR 09-25-85 RUN #1 4344-8642 ~2"~ DIL/SFL-GR 09-25-85 RUN ~.1 4344-S642 .~ 5'J! DEN/NEU-GR PORO 09-25-85 RUN ~1 4344-8617 ~ "2"~ DEN/NEU-GR PORO 09-25-85 RUN ~1 4344-8617 "~-5.'j DEN/NEU-GR RAW 09-25-85 RUN ~1 4344-8617 ~2~.~,DEN/NEU-GR RAW 09-25-85 RUN ~1 4344-8617 x' CYBERLOOK 09-25-58 RUN ~1 7940-8600 '% 5"/ DIL/SFL-GR k 2t~// DIL/SFL-GR · ~' 5 DEN/NEU PORO 'ii~ DEI~/N~U PORO \ DE N/N EU RAW ~ DEN/NEU RAW ~ \ CYBERLOOK 4314-86i7 4314-8617 7671-8592 7671-8592 7671-~592 7671-8592 7671-8592 ~CEIPT ACKNOWLEDGED: ?mE CURRiER {EVRON M* BL DRILLING* DL L. JOHNSTON MOBIL NSK CLEKK*bL 09-17-85 RUN ~1 4300-8522 09-17-85 RUN ~1 4300-8522 09-17-85 RUN ~i 4300-8496 09-i7-85 RUN ~1 4300-8496 09-17-85 RUN ~1 4300-8496 09-17-85 %;. PASHEk STATE OF ALASKA*BL EXXON SOHIO /SE PHILLIPS OIL UNION j. RA?~/~ELL* bL VAULT/ANO*FILMS ARCO Alaska· Inc. is a 5ubs,cliar¥ of AtlanticRichfie|dCo."nDan¥ t<E'2U I.'d,,i 'fO: ©PLN IIOLE LIS v3S-6t/ 10-02- .~BJ-5/ 09-25- ~~~ 09- ! 7- ~F-2 ~ 1.0-02- ~3f'-I / UP 2' ~3C-2 ~ O3C-1 0~-23- ~3A- 4 ~ 09-21- ~2A-13~ 07-16- ARCO Alaska, In.i, Post Oflic~x 100360 Anchorage, AI3ska 99510-0360 Yelcphone 907 27G 1215 DATE: 10-10-U 5 TKANSHITTnL NO: 5393 ' "l' "' I ['~ C ,~ ALASKA, . KUPARUK O[-'UI",ATIONS EIiGIHUEKING l<ECOldJk; CI,i]ld~ P.O. BOX 100360 AI~Ci1Oi~AGE, AK 99510 IIEI<IA,'ITII ARE TIiE i<ETUKN ONE SIGNED TAt'LS/ bClil,/ ON 85 i~Ui~[ Ill 42 U 5 P,U N ti 1 43 U'5 I<UN f., 1 16 85 RUN ~1 34 85 l<Ull ~ 1 39 85 HUH t~1 3U U 5 I<UI~ ~ 1 24 U 5 hUN il 1 37 85 I<UH t~ 1 76 FOLLOWING iTEHS. PLLASE ACKNOWLEDGI] CoPY O1" Tills 'I'[<ANSI,~ITTAL. L 'i'I~PIJ PLUS 84.5-}5649.5 17.5-8 679.0 UU.5-8522.0 93.5-7865,5 44.0-8654.0 58.0-7 622.. 0 50.0-8308.0 95.5-~4~4.0 43.5-8160.0 LISTING t{IJF #70853 RUff ~7UU4O I<EF ~70837 RUF ~ 70825 REF ~ 70832 b~EF ~70830 REF ~70545---REVISUD l<i:C E i P'£ ACKN O;, L ED£;U D: b P ;', L B. CUJtl<ii:I{ C!: EVi{Oi.I D Iii 5'i'l<l U U'i'IOi~: La.~ i i_, 1_,.1 i IG ~.~. L. JOti~l',J'!'O]4 1-'0 ~TM L i-',.i ! LL lt'S i',ISK CLL;I.',i( J. iiATII[-Ii';LL AriCO AInckn. Inc is a ~-.bsid,nr¥ el AtlanlicRirhfic;dComl]~ny ARCO Alaska. Inc. Post Office B~... 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 14, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commi ssion 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: State Reports Dear Mr. Chatterton: Enclosed are the September monthly reports for the following wells: 3A-2 3C-3 3J-4 WSP-6I (workover) L3-5 9-29 3A-3 3C-16 3J-5 L1-2 4-21 11-8 3A-4 3F-1 3J-6 L1-14 (workover) 4-30 11-9 3C-1 3F-2 1R-3 L2-13 4-32 11-11 3C-2 3J-3 1R-4 L2-26 9-24 15-7 16-17 If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU11/L62 Enclosures ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA O~:"AND GAS CONSERVATION COb, ..... ,ISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS ;1. Drilling well [~X Workover operation [] 2. Name of operator 7. Permit No. ARC0 Alaska, Inc. 85-165 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21400 816' 4. Location of Well at surface FSL, 560' FWL, 5ec.3, T12N, R9E, UM I6. Lease Designation and Serial No. ADL 25630 ALK 2563 For the Month of. September 5. Elevation in feet (indicate KB, DF, etc.) 82' RKB 9. Unit or Lease Name Kuparuk River Unit 10. Well No. 3J-4 11. Field and Pool Kuparuk River Field Kuparuk River Oil Pool · 19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 2215 hfs, 9/10/85. Drld 12-1/4" hole to 4315'. csg. Drld 8-1/2" ho]e to 8544'TD (9/16/85). Ran logs. Ran, = 8437'. Secured well & RR ~ 2200 hfs, 09/18/85. Ran, cmtd, & tstd 9-5/8" cmtd, & tstd 7" csg. PBTD 13. Casing or liner run and quantities of cement, results of pressure tests , 16", 62.5#/ft, U-40, weld conductor set ~ 111'. Cmtd w/183 sx AS II 9-5/8", 36.0#/ft, J-55, BTC csg w/shoe ~ 4298~, Cmtd w/1400 sx AS '6". Performed top job w/250 sx AS I. 7", 26.0#/ft, J-55, BTC csg w/shoe ¢ 8526'. Cmtd w/350 sx Class 6. III, & 340 sx Class 14. Coring resume and brief description None 15. Logs run and depth where run DIL/SFL/SP/CAL/FDC/CNL/GR f/4298' - 8530' 6. DST data, perforating data, shows of H2S, miscellaneous data None 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NOTE--.Repor~on this form is required for each calendar month, regardless of the status of r~;;~tions, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 TEMP2/MR4 1 Rev. 7-1-80 Submit in duplicate MEMORANOUM State of Alaska ALASI~A 0II~ AND GAS CONSERVATIO[~ CO!,~-~IoolON TO: Co V/~;¢~,at.t er t on Cha~i~a~ .., THRU: Lonnie C. Smith Core, is s ioner FROM: Bobby D. Fostet:;':'~.::.f Petroleum inspector DATE: s=ptember 16, 1985 FILE NO: D. BDF. 81 TELEPHONE NO: SUBJECT: BOPE Test ARCO- 3J-4 Permit No. 85-165 Kuparuk River Field Friday_, September ].3, 1985: The BOPE Test began at !:30 PM and was concluded at 2:30 PM. As the attached BOPE Test Report shows, there were no failures. In summary, I witnessed the BOPE Test on ARCO's 3J-4. Attachment 02-001AfRev. 101701 O&G 5184 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Inspector [ ~-0 Operator Well ~ ~7-- ~ Drilling Contractor Location, General. (3~ Well Sign~C General Housekeeping~Rig Representative p~/~ Casing Set ~ ~G7 ft. Rig "/G/ Representative~~'~~¢ ACC~ATOR SYST~ Full Charge Pressure psig Reserve Pit ~i Mud Systems Visual Trip Tank j Pit Gauge / Flow Monitor ~'/" Gas Detectors Audio BOPE Stack Test Pressure Annular Preventer / Pipe Rams Choke Line Valves H.C.R. Valve / -- Kill Line Valves Check Valve Pressure After Closure /Z~'~ psig Pump incr. clos. pres. 200 psig -~ min~ec. Full Charge Pressure Attained: ~ mind'sec. Controls: Master Remote~~ Blinds switch cover Kelly and Floor Safety Valves Upper Kelly / Test Pressure Lower Kelly / Test Pressure Ball Type / Test Pressure Inside BOP / Test Pressure Choke Manifold ~~Tes~ Pressure3~~ No. Valves // Test Results: Failures Repair or Replacement of failed equipment to be made within Commission office notified. Remarks: l~ ._~ No. flanges ~ -~ Adjustable Chokes ~ Hydrauically operated choke / Test Time / hrs. days and Inspector/ Distribution orig. - AO&GCC cc - Operator cc - Supervisor ARCO Alaska, Inc. Post Office ~ 100360 Anchorage, Aiaska 99510-0360 Telephone 907 276 1215 August 20, 1985 Mr. C. V. Chatterton- Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built Location Plats - 3J Pad Wells 1-16 Dear Mr. Chatterton' Enclosed is an as-built location plat for the subject wells. If you have any questions, please call me at 263-4944. Sincerely, · Gruber Associate Engineer JG/tw GRU11/L07 Enclosure RECEIVED AUG 2 19B5 Alaska Oil & Gas Oons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany · I$ ~ I1 °11 , $ ! r i. COORDINATES ARE A.S.P.~ZONE 4 2. SECTION LINE DISTANCES ARE TRUE. 3, HORIZONTAL POSITIONS BASED ON THE D.S.-$J NORTH- WEST E~ SOUTHWEST WINDOW CORNERS PER EIq,.B. ~A,$SO;. 4. VERTICAL POSITIONS BASED ON TBM 85-7-27-1 PER LHD & ASSOC. 5,0. G. ELEVATIONS iNTERPOLATED FROM S/CDWG, CED - RIXX -- 3)060 rev. ztb RECEIVED AUG 2 !985 _ mm CONDUCT ORS ! - 16 I [ 1- ¥- 6.002,~22,6e x, 563 rWL, ?65 3- Y- 6,002,~72.5g 563 FWL, 790 4- Y- 5,002,~97.$9 X. 56~ FWLo 5- Y= 6,002,522°57 X= 519,5~.65 56~ FWL, X, 56~ FWL, 865 ~- Y- 6,002,572.6[ X. 519,5~,67 56~ ~WL, 690 B: Y- X. 564 PWL, 915 rSk, g- Y- 6,002,672.63 x. 519,544.74 56~J rwk. LeO' FSL, 10- 'r= 565' FWL, 1015' X- 519,5~.73 565~ FWL, 10~0' Alaska 0il & Gas Cons. CommissioF~_ Anchorage I HEREBY CERTIFY THAT lAM PROPERLY REGISTERED AND LI$CENSED TO PRACTICE LAND SURVEYING IN THE.. STATE OF ALASKA~ THAT THIS PLAT RE'PRESENTS A SURVEY MADE UNDER MY DIRECT SUPERVISION AND THAT ALL FSL, LAT. 70~25 0&.020, . OG. ~1.3. P~D ~$.3' kll. 70°25 0~,2~" LONG, 1~g°50'26.{6~~ OG ~I.0,.PAD ~5.6 Lkl. LONG. FSL, OG, LAT. LONG, FSL. OG. L~T. 6,002,74?,62 LAT. 519,54~.?B LOMG. 5~5' FWL, 1065'rSL, OG. 13- Y= 6,002,772.67 LAT, X- 519,~.?B LONG. 565' FWL, lOgO~ FSL, OG. 70025 kO.g, ¢~D ?0°25· 0~,758" 1~g°50'26.$63' ~O.B, PAD ?0025 05,003" LONG., 1~9°50'26.661 OG, ~0.9 PAD ~5.~ LAI. 70°25 05.250" LOMG, 1~9°50'26.859 0O, ~1.0, PAD ~.~ LAT. 70025 05.A95" LDIG. 0a, mi.l, ~iD. Ll~. ?0°25~05,?~1'' LONG. OG.'~X.2, PAD. LAT. 70°25'0~,&7~ LONG. 1~9°50'28.8~ LAT. ?0e25~0~,725" LOMG. 1~050'2~,1~5 FSL, 0G. 6~.0, PAD LAT. ?0025'06.971 L0#6, ?0~ 25' 07 . 217" 14 go 50 ~ 25. B~0 ~0,7, PAD ~5.5 70025'07,~83" 1~9o50'26.837 ~0.~, PAD ~5.~ DETAILS ARE CORRECT AS OF JULY 30~ 1985. LOCATED IN PROTR~TI~D SEC. 3, TI~N, EgE, U. MER. ¥= 6,002.797.59 tkl. ?0o25'07.?08'' X. 519,5~q.78 LONG.l~9°50'26.836 565' FWL, 1115' rSL, OG. ~0,3, PAD Y- 6,002,822.60 L~l, 70°25'07.95~ X- 51g,5~4.80 LONG. 1~9°50~26.633" 565'FWL, ~140m FSL, OG, ~0.1, PAD Y- 6,002,3~?.58 LA). 70°25'06.200" X- 519,5~.$0 LOMG. ~9°50'26.831~' 565~ FWL, 1165~FSL, OG. ~0.0, PAD. ~5.~ ,6t~ ARCO Al omko,_L0~ [1~ ' Kulaoruk ~,roJ~Ci DRILL SITE 5J CONDUCTOR AS-BUI LT LOCATIONS :~.~,1~ ~: 1" t 300' by: ~ ~. I~, N~4r~ 85 - 13 July 18, 1985 Mr. J. B. Kew in Area Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Re .- Kuparuk River Unit 3J-4 ARCO Alaska, Inc. Permit No. 85-165 Sur. Loc. 816'FSL, 560' ~FWL, Sec. 3, T12N, R9E, IrM. Btmhole Loc. lll7'FSL, 1352'Ft-~, Sec. !0, T12N, R9E, Dear Mr. Kewin: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a brief description of each core and a one cubic inch size chip from each foot of recovered core is required. Samples of drill cuttings and a mud log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. l-Ir. Jeffrey B. Kew ~. Kuparuk River Unit 3J-4 -2- July 18, 1985 To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Co~ission may be present to witness testing of the equipment before the surface casing shoe is drilled. I,~ere a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours, ! //" I / i · ',.. .,y'. i [.../,/._/_,-/ :i{...~ '~!f ~2 . ~_~.. ,~ ,___ ! / C. V. Chatterton Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE CO}~-fISSION be Enclosure Department of Fish & Game, Habitat Section w/o enc!. Department of Environmental Conservation w/o enclo Mr. Doug L. Lowery ARCO Alaska, Inc. ?o~t ~ ;.!fica'-'.- ~J~_~:.. ~00360 Anchor~.,.~:je, .qJ~.,sk~ 99510-0360 foh-'~-,no~e 907 :?.76 12i5 July 12, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine DriVe Anchorage, AK 99501 SUBJECT: Kuparuk 3J-4 Dear Mr. Chatterton: Enclosed are: An application for Permit to Drill Kuparuk 3J-4, along with a $100 application fee Diagrams showing the proposed horizontal and vertical projections of the wellbore o A proximity plot Diagram and description of the surface hole diverter system o Diagram and description of the BOP equipment We estimate spudding this well on September 8, 1985. If you have any questions, please call me at 263-4970. Sincerely, B. Kewi n Area Drilling Engineer JBK/LWK/tw PD/L129 Enclosures ARCO Alaska, Inc. is a Subsidiary of Atlan!icR~chfieldCompany STATE OF ALASKA ALASKA OrL AND GAS CONSERVATION COr~,-MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL E~X DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC SINGLE ZONE ~ MULTIPLE ZONE 2. Name of operator ARCO Alaska, Inc. . _ 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of v~ell at surface- - 816' FSL, 560' FWL, 5ec.3, T12N, RgE, UN At top of proposed producing interval 1551' FSL, 1283' FWL, 5ec.10, T12N, R9E, UN At total depth 1117' FSL, 1352' FWL, Sec.10, T12N, RgE, UN 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. RKB 82', PAD 47' ADL 25630 ALK 2563 j U L 1 6 1985 9. Unit or lease name Kupa~~f &ln$1~S Cons, 60mmissi 10. Well n~mber A~ch0ra. ge 3J-8 11. Field and pool Kuparuk River Field Kuparuk River 0il Pool 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type 5tatewide Surety and/or number #8088-26-27 Amount ,$500,000 13. ~t~nceand directionfrom nearesttown 30 mi. NW of Deadhorse 16. Proposed depth iMD & TV~i' 8525' MD, 6553' TVD 19. If deviated (see 20 AAC 25.050) KICK OFF POINT 600 feet. 21 14. Distance to nearest property or lease line miles 560 feet 17. Number of acres in lease fe~t +2560 20. Anticipated pressures MAXIMUM HOLE ANGLE 44 o (see 20 AAC 25.035 (c) (2) Proposed Casing Liner and Cementing Program 15. Distance to nearest drilling or completed 3J-3 well. 25 feet 18. Approximate spud date 09/08/85 ~psig@ 80°F Surface 3~0l~ psig@ 6~.!0 ft. TD (TVD) SIZ~ ..... CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT ~si~g Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) ~ 16" 62.5# H-40 Weld 80' 36' I 36' 116 116' ± 200 cf 12-1/4"I 9-5/8" 36.0# -55/HF-E~W BTC 4129' 36' 36' 4165'I 3420' · 1200 SX AS III & I I [ ~ I 340 sx Class G blend I '8-1/2" I 7" 26.0# -55/HF-E~W BTC 8490' 35' I 35' 8525'l 6553' 300 sx Class G blend 22. Describe proposed program: ARCO Alaska, Inc., proposes to drill a Kuparuk River Field development well to approximately 8525' MD (6553' TVD). Selected intervals will be logged. A 20", 2000 psi annular diverter will be installed on the 16" conductor while drilling the surface hole. The 13-5/8", 5000 psi, RSRRA BOP stack will be installed on the 9-5/8" surface casing. The stack and related equipment will be tested to 3000 psig upon installation and weekly thereafter. Expected maximum surface pressure is 2874 psi. Pressure calculations are based on virgin reservoir pressure. Surface pressure is calculated with an unexpanded gas bubble at surface, including temperature effects. Casing will be tested to 3000 psi prior to releasing the drilling rig. Non-freezing fluids will be left in uncemented annuli through the permafrost interval. 3J-4 will be 25' away from 3J-3 at the surface. There are no closer wellbores anywhere downhole. Reserve pit fluids will be disposed of by pumping them down the 7" x 9-5/8" annulus of this well. The 7" x 9-5/8" annulus will be left with a non-freezing fluid during any interruptions in the disposal process. (continued on attached sheet) 23. I here[~'~-e{tify th~)t the foregoing is true and correct to the best of my knowledge The space below for Commission use (/ 7 ~/ Area Dri 11 i ng Engineer DATE CONDITIONS OF APPROVAL Survey APl number Directional required i ~L.YES []NO 50--0 'b~- ¢?-'! ~/' C,~- SEE COVER LETTER FOR OTHER REQUIREMENTS Samples required " Mud log required ~.~ Y ES ~/XJ O E]YES [~NO --Permi~number ~,_g..~_/~.,,~- * ApprovaJdate . _ ~~85 APPROVED BY ~~/, Rev. 7-1-80 ,COMMISSIONER DATE July 18, 1985 bv order of the Commission Submit in triplicate PERMIT TO DRILL 3J-4 (cont'd) Upon completion of the disposal process, the 9-5/8" x 7" annulus will be sealed with a minimum of 200 sx cement followed by Arctic Pack. The well will be completed by the workover rig using 3-1/2" or 2-7/8" tubing. Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. A subsurface safety valve will be installed and tested upon conclusion of the job. After the workover rig has moved off location, this well will be fracture stimulated. .HORIZONTAL PROJECTION SCALE PAD 3J. WELL NO, 4 PROPOSED ~KUPARUK FIELD. NORTH SLOPE. ALASKA ~^S,"""'-,,.~%T°~,~-. 'i"c' ....... :~-:-' :' :--: IN. = 1000 FEET ....... WEST-EAST -- 2000 - 1000 - 0 ....... l 000 -_ I I _ 1000 _ 2000 ............... ............. 3000 ................ ~ ....................... .4000 _ 1 000 2000 I I ~RFACI~ LDCAT ! ON ~ 816' FSL, 560' Iq, IL SEC. 3, T12#, AgE ............ 5000 _ TAROET CE#TER TYD=6342 TMD=8230 .... ~ DE.P=4836 SOUTH 4??6 EAST 760 TARb'"'~T LOCATION, 1:320' FSL. 1320' 'FWL SEC. 10._ TI2N. RgE . TD '(LOOOINO PT) S 9- -DEG 4836' (TO 3 MINE TARGET) ARCO'- AI.]~S'KA-; .... ! NC-. - ................ PAD 3J. WELL NO, 4 PROPOSED. KUPARUK FIELD.. NORTH SLOPE. ALASKA EASTHAN WHIPST~CK,-INC. -- 1000 .. SURFACE ................................................................................ _ . - . KOP TVD=600 TMD=600 DEP=O 3 . . IS BUILD 3 DEO . . PER 100 FT - 2.1 _ . 33 BASE PERMAFROST TVD=1685 TMD=1754 DEP=338 39 'EOC TVD'1933 TMD=20Z5 DEP-542 TOP UGNU SNDS TVD=224,0 TMD=2S04 DEP=841 .... - 3000 .............. 5000._ o ............ 6000 _ .......... 7:000_ TOP W SAK SNDS TVD=2910 Tlfi_.D=3439 DEP=1494 K-12 TVD=3230 THD=3886 DEP=1805 CSG PT TVD-3430 TMD=4165 DEP=2000 -- - AVERAGE ANGLE _ _ . 44 DEG 14 HIN JULY61985 & K-5 TVD=5380 TI'ID=6881 DEP=3899 ~ ' TOP UPPR SNDS TVD=61-02 TMD 7895 DEP--.4602 TOP LOWR SNDS TVD-6273 TI'ID=8134 DEP=4769 , ",,,. ,, TARGET CNTR TVD=6342 THD=8230 DEP=4836 ,. "',,. ',, BASE KUP SNDS TVD=6410 Tl'lD=83~§' DE1~=4902~ %,,, TD (LOC; PT) TVD=6553 TI'ID-8525 DEP=5042 "' ............ I I I I I I 1 000 2000 3000 4000 5000 6000 VERTICAL SECTION ..... . _ _ . ................. .-. ..... ~ .... ~ ..... i .......... ~ ........ ~ -' - - ~ .... ;-- - :-- ..1 O0 .... ~ ...... 200 '-:'--: ~300'-:': ....... ',400 - · ....... 500 600 ?00 800 -?-oo:~.'.:.-: ..':-:-:: ~'... i-'- :-:'~: :':' '--i' '~-::: ::: :-i-~-'' : :::;~::-:-- ~ ;-- -i ...... ' I- -' I -'" '-' I .... - ~ ~._~_: .................... i ............. ~..:-:__: ....: ........... !_: ..... · ........................... ..... ~ ............ ARCO.'--AL^SKA'--IN ' ' ' ' ' - ' '" ............... PAD ::3J.-WELL- NO, -1-~2-3-,4 PROPOSF'D:. .... ~ ........ : - '::_L:.~:-.: :: .... ' ......... -: -: ........ i-: .... '-;. - -:~ .... :.-.~--~---:-:-:'-.-~- .... ~.- ;-;: ' --i .... :--; ..... 'K ~v- :¢':% ~ D~t>~.~._.~_:."-. - Z._-_:_ ..... ..: . · . . __, .... :,.__~ . . ¥_.. ~ .......... :_:~.~ .... 1:__~ ............ ,EASTMAN _WHI PSTOCK,:_~NC_.~'.' '., ' ~ ........ : ...... ..... .. ', ......... i .... : .... : .... -- -'. ...... ~ -- ~-~ ........ [ ........... ~ .... , .......... ~ : _ ............. NOI£~ ...... W£t.k -PATHS -EX?£ND-BE¥OND ~ ....... , ....................... iHI$_5¥iE~INO2WINDO~-:-.-! .... :_.~._.~__ ~.- ~.?--- .¢~!/ - _: .i'::21": · ............... .--_. : ..... ] .......... '. ........ : . ' i ...... : . ~ /[.-~F '7, z"/--3- .... . ~/~O_O_L_ ' ........ i ...... :.- .; ' · ~ ~ ............. : ...... :, ............. i .... - i ' ' ................ : .... ~ ' : ' ' ' i' ' -i .......... ', ..................... ........... ~ ........ : . .~ L ; .. ......... : ...... ~77 ---:' -. ., ......... :.: ..... : ...... ~- · :--~: ..... ::-.~'~ .- 1227 -, -- : ........... ~ ...... ~ ..- ' i277- ~ ~ - :~6:00 ......... ~-" ' ...... ~ ............ -:'- . . ,. i.-:-:.i-'-~'::::-.:."".::':-'-i: "-:-:.'-i --::.-~ --.: :'- ...... .... : .' -::i:-.-' .,~'-i) ::'"~_~'.'o*.'"' ' !t-::.:-: i::' !-::!--:'-:": :. i!::!-:!-:-: ;:--:_-. :_:>:---': ....... "-:':-:--"::'-: ..... .-'-:' :'-:"--- ,' ..... : ..... ."-:'--'- -{':~--:":- -: .............. :-_ ........ t,,r, - ' ' - ............ -:....-- :-: -:... 1 r~(h t23o._~ -. ' _ ....... ' ............ i KUPARUK RI VER UNIT 2_0" .DI VERTER $CHEMAT I C DE $ CR I PT I ON I. 16" C~CTOR. 2. TANKO STARTER HEAD. 2. TANKO SAVER SUB. 4. TANKO LO~R QU]CK-C~CT ASSY. 5. TANKO UPPER QUICK-C~CT ASSY. 6. 20" 2000 PSI DRILLING SPOOL W/lO' OUTLETS. 7. I0' HCR BALL VALVES W/lO' DIVERTER LINES. VALVES OPEN AUTOMATICALLY UPON CLOSURE OF At,,I'a,)LAR PREVENTER. 8. 20" 2000 PSI ANNULAR PREVENTER. MAI NTENANCE & OPERAT ] ON 2 i. UPON INITIAL INSTALLATIO~ CLOSE PREVENTER -AND .VERIFY 'THAT VALVES - HAVE OPENED PROPERLY. 2. CLOSE AhI~LAR PREVENTER Aha) BLOW AIR THROUGH DIVERTER LINES EVERY 12 HOURS. 3. CLOSE Ah~LAR PREVENTER IN THE EVENT -THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. IF NECESSARY, MAhkJALLY OVERRIDE AhD " CLOSE.APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION, ' ~ DO NOT SHUT IN V~ELL Ub, E)ER ANY CIRCUMSTANCES. 6 5000 'P$~ R$~A BCP STAQ< 5. I1' - 3G~ PSI 4. 13-5/8' KI~ LI~ 6. 1~8' - 7. 1~8' - A CCtA43,,,.ATOR. CAPACITY L--~q~L WITH ~IC FLUID. ~ THAT A~TC]:~ ~ IS ~ P~I WI'TH DBSERVE TI~EL, '5-EN C:_DS5 IALL UNITS ALL LINITS ARE CLOE~D WiTH O-~A~IN3 PgldP (:FF. RECCRD C~ NADC ~5PCK~, T~E AOCEFTABLE LOneR LD,5'T 5 4 3 2 tl. FZLL EK:P DTACX AND C3=O(E 'MAN~FD.D W~TH OEO< THA'~ ALL LDO< E~ SC~ IN ~/I-EAD FU_LY R~'TRAL-FED._~T T~ F~UG IN ~TN ELtd~Ih~ JT AND ~UN IN LDC]~OI~N LINE VALV~j.S ADJA~ TO ~ ~TAOC ALL OT~ER PR~E;StRE t~, TO 2.50 PSI AN:) HOD FOR I0 I~IN. C~EAS~ ~ TO 503:) PSi A~D HOD FCR LINE VALVES. O_OE;E TOP PIP~2 ~ AND HO~ YALV-r_S ON K~LL AND. 0-0<~ LINES. TF.~-L TO 250 PSI AN:) 30~0 PSi AS IN STEP CChFT. INL~ TESTIN~ ALL VALVE~, LINES, AND W~'TN A 2.S0 PS! LC~ AND 5000 PS: HI~. TE~T AS IN FUN~i~ ~ ~ T~ ~0 NO~ FU.i¥ O_a~... TE:S'T BD'F~i:~ PiF:~. RAVE; TO 2.~ PSI AND 30:::I0 PS:[. .O. OS~ BL~ND P.~WE AND TE~ TO 250 PSI A~D 3000 MANIF~ AN:) LIAE:$ ARE DJ_L. CF NEIN-FA~'VTIh~ FLUID. Sg"T 'ALL VALV:',S IN ERiLLIN$ POSITI~L '-]2. TEST' 5"rAN~IPE VALVD. S, I,C~_ ! Y, K'~.I ¥ COO<S. ERIL.L PIPE SAFETY VALVE, AND IN.~ID~ l~P TO 250 PSl AND 3CO~ PSI. - JNE~Y T~ FIJ~ICt~Y O:~TE ~ DALLY. ~ -. U L't 6 19 5 A~ska 0il & .Gas-Cons. 5100G4001 REV. MAY 15, ID~ CHECK LIST FOR NEW WELL PERMITS Company Lease & Well ITEM APPROVE DATE (2z thru 8) 3. 4. 5. 6. 7. ( - 9. (3) (10 and Y2) ' 12. (13 thru 21)/ 1~. 15. 16.' 17. '. 18. , '19. , 20. 21. (1) Fee (2) Loc Is the permit fee attached ......................................... Is well to be located in a defined pool ............................. Is well located proper distance from property line . . Is well located proper distance from other~ wells . . . Is sufficient undedicated acreage available in this pool ' Is well to be deviated and is wellbore plat included ............... Is operator the only affected party ................................ Can permit be approved before ten-day wait ......................... YES NO REMARKS Does operator have a bond in force ........ ' .......................... Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Is conductor string provided ...' .... ............................... Is enough cement used to circulate on conductor and surface Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will surface casing protect fresh water zones .................... Will all casing give adequate safety in Collapse, ten~n and burst . Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ...... ...... Is adequate wellbore separation proposed ......................... ... (22 thru/ 2~{) 22. 23. 24. 25. 26. / ,' 27. Is a diverter system required ........................................ ~,~// Are necessary diagrams of diverter and.BOP equipment attached ........ /.~JZ Does BOPE have sufficient pressure rating - Test to ~zS'~ psig ...,~iIj/ Does'the choke manifold comply.w/API RP-53 (Feb.78) .................. Is the presence of H2S gas probable ................................. , Additional requirements ............................................. o Geology: Engineering: J'AL~._..~.~~''-'''/ rev: 03/13/85 6.011 INITIAL GEO. UNIT ON/OFF POOL 'CLASS STATUS AREA NO. SHORE , , . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. 0 00 nn 0 000 OhO () n (,, 0 nO '1'¥ PE 0 n. 0 C ATE 000 000 0 no 0 f) ,¢) 000 000 00 0 0 00 0t. 8 004 014 002 O04 002 0,.12 O03 filZg 0',') ! O65 ¢ 065 0~5 06,5 065 0~5 O65 065 065 C ~'10 E; 0 ~ 5 D E P T L, 9 r~ i r, r;, R F f} ~,! cr3Dg 4 ,4 I 68 4 1 .68 4 i 68 4 l 68 4, 1, 68 :.~ 1 68 4, .1. 68 4, 1 68 4 1 68 f 0 C T A L ) 68 00000000000000 68 O000000nO00000 68 00000000000000 68 00000000000000 68 O000000000000O 00000000000000 00000000000000 o0000000000000 O000000000000O 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 * * D ~ T a OF, PT $ P S P 'YPq i $ P 3.1 /.94 5254 -,37.SOnd ?.4592 -39.144-5 ,.46. q '7 r., 0 ,q F),i..i ?.7lOt) Ihf' ~ C :': b 2107,5 fi.) f; (i F C h! c,( 97. ?'t7 3 Ck ,"! <" ,'~: i., 20 t ,~. 62 '75 v C, ~-: ,,~ ) u n. n[t "! 0 ?, F ? ~.f ri. 7773 r: R -999. 2500 38,6992 CAb! 381,3906 '.~. 8967 38,6992 3.5159 3,'72~8 94.0273 3.0374 773.3125 lO3 8 ll,.q ~32,3 4.0 9q.7 t. 0 713 3 ? 7 406 On4 148 944 125 242 77 3 I, 39 12.5 T b I~ CAI.., l R NPA ! biv CALI c: ~ [, £ o ,,j R A CALl PSPA -999,2500 8.5020 3,431.9 3,0159 8.5879 3,~948 9.1270 3,2131 2 992q ~,~70 12.0566 q 9004 3:2901 4.0242 9.1660 3.0374 DE;PZ ~ P R H n ~.,~ NpH I DEPT SP S'P R HO ~.~ ?,~ p ,t,~ I SP D t<P T N P H ,[ D..F] P T $0 $ P 7 ~,,'..) O. n 00 t., ~I F,.r58~9 74 O !'). 00 r~ 0 .q g f, . a 9 0. ? b '''~ 0 '"' C a, ,qg~.'~bnO ,qb'Ir.ti 2 ¢~ 4. !.. 50 C. 0 F fi: t,~ ! 2'7.6523 CR -0. 0044 NRAT 1 '! 0,1. 5 ? .3 C R -99q, 7500 NR~, i; -o99. 250[,) 3.4.553 Thf> 180,5b75 -o,:)q. ,?. 500 - 09 o, 2500 F C ~",: {, 19~,o0675 CR -g99. 2500 ,~?RA -ogg.25nO '9. 0.2500 ~i p ~. '1 -090.75o, o ~C~'[,, 3.35 '7 '! !. b r:, d.50R5 TL,r~ 1009 71~8 Ch' 9. dO04 77.0273 ~. ,q. '7 fi 8 RT~. 3125 3.0002 124.,2773 3.0061 708,81.25 1,6983 1.30,!.875 3.6858 517,8125 2.6057 !.55.4375 3.g905 443.1,t06 1.721'1 -099.2500 -ggq.2500 -~99'2500 9.,9983 -o99.2500 · 90. 2500 3,0354 -990.2500 -090.250(') 3.6506 -99o.2500 -09q.250{) -09~.2500 :~.0'76,t -o90.25o0 -o9o.~500 -99q,250o 1.8'752 -090.2500 -99o.2500 -o99.7500 ~.1335 -o90.25no -~9~.75oo ',1: L, ~ C A. h I RNRA C A L :I: R N R A I b M C A I., :1 R N R A, I b M C A L I RNRA RNRA I b~ CALl.' RNRA RNR~ CAI,i ..1: L, ~ CALl C A [,, I 8,6660 9,2~85 3,0 76 3.0374 1.0,4004 3. 3635 1 7608 9~4941 3,7971 2.6545 9,5176 4,4605 1.7442 -g99,2500 -g9q,2500 .].~6~7 -g99, 500 -999,2500 3,1389 'g99.~,500 'g9g,2500 3 65~4 -999!2500 -99g ~500 .{, 1584 -~99.2500 -999 ].~104 -999.2500 -09g.~500 4.18o4 -9gg.?500 ogq 2500 Rilnt~.~. ,.q9o. 7500 DRHO D k; P T 6 4 U 0, ~ 0 0 t) ~ F !, (! F! p f-.: 1 ,. o 9 q,. ? 5 ¢"' 0 ~! C ,~: r) E .r, T ¢- 10 O. 0 ~,~ .'I '3 S F f, t j D t7:. 19 '1" F- n C' 0 · 09 :'~ ~/ P, I:, f, U 'J' P ~-~ I ,. a 9 q. ? 5 ;" t) ,'4 C ?" k. ?.73a6 ?, .P, 3 ~,! !. T 1, r) - 999,25 ¢ 0 F C ~'! L, - 999.25 P 0 ~.f R ,,~ T -o9¢.', ~5e(.~ 2,0452 I L D - g g 0 ,, 2500 F C ~'' !,,, 2.24E 3 TI,i) L~6.02'73 d~ ,,,eg~, 25C0 lVRnT -09o. ?5C.u FC~'?l, 2, n9.c'9 76..t 523 dR -ggq.2500 -~90.25¢0 -e9q. ?_ 5C, 0 4,4 !, '! 'ri;,,"', - c,, c~ g, '25 (" (/ ~' t': ':'., I, 104,02 '~ 3 C -99g.2500 -99g.7500 3,2639 -~99.2500 -999 2500 ~g~2500 2.6584 -999.250(~ -o99.2500 -999,2500 2.3401 q99,2500 :99o. 2soo -09g. 2500 2.68!9 -09~'2500 -~9g.2500 -999,2500 2 2952 -099~2500 -999.2500 -ogg.25nO ~,3'i72 -999,2500 -o9g.2500 -999,2500 2.2405 -e9g,25oo -qgg.250o -o90,2500 6,87'1 -a99~2500 -99~,2500 -qgg.2bO0 3.0120 -~99.~500 -o9Q.2500 (': A L t :If, b .~'~ rAt,.'l CA[,[ I .L ~'" CALl, T PAI,I T L,u RNPA CALl ~NPA 3,0104 -99g.2500 -999,2500 -999~500 -999.2500 2,8401 -999,2500 -g99.~500 2,~877 ~g99, 500 999.~5~0 2.7307 -099.2500 -999,2500 2 .25S 1 -999,2500 2,3499 '099,2500 '999,2500 2,2405 -99g,2500 -999,2500 2,281.5 . 99~2500 2,6194 -99g.2500 -999,2500 3,0530 -g9q.~500 -099.2500 q p T.I I - ¢') 9 Q. :~ 500 ?'; C. ''~ L. ?. 72,1~ 9 1' b ['l 1 04.02'73 CR 2 ,, ~ 0 't. 0 T I.., n ~ i.) 9.21 ':: 8 m a -o99,25r'!0 -.o. 99,2500 . C'lb ?. 5 5 ~ 0 I L n I <)2,33"~B -o99,25~0 2 · 70 'i 3 l [., 3 ! 12,08'::~$ CR - 99 o, ? 5 c,~ 0 F' C ~'~ iL., 1 U7,71, ~,~$ C,R 05.7773 4. ?t;'78 It,:~ - ~ 9 ::'. 753 (5 F C "! !.., .~.)o. 25nu FC'"!I. ~. P167 2500 -q99 ,, -99g. 2500 3.0178 -q9:~.2500 -999.~5n0 -099.2500 2 9807 -q99 2500 · .99P' ~500 2,82'25 -999,~500 -~9q.2500 -q9o.2500 2.9573 -999.2500 -g99.~500 2.4'768 -q9~.2500 -qgq. P500 -q99.2500 2.7834 -99Q.7500 -q9~.2500 4.46!'7 -990.2500 a,0437 -~99.2500 -0g0.2500 ~.7151 -09~.2500 -990.2500 a..6726 94.0273 l i.~ C A L I C A i., I I IL., ~ ¢ A L I P ~i P A CA[,I I. L 1~ C A L i {:',NRA 1: L M CALl T CAI, .i. ? i~: R A 1 t.., ,v car,l r?, ~A 2,"7971 999,2500 :999. 2500 2,9514 -999,2500 -o9q,2500 2 -~.9qi2500 -99g 25(]0 -999 ,. O0 '999.2500 2,8596 -999.2500 '999,2500 2,4475 -099.~500 ~.6506 '990.~500 -o99,25n0 4.1492 oq9.2500 -999,2500 -~99,2500 -~gg.2500 3.5452 -990.2500 -999.7500 0.5879 3.5 1 ~ 9 2o95.50o0 3,4 b "; 0 T ;'42. R .it ':; g fl.. R n.O1 !,2 2n~! .509o 9,66';5 9o o 75o0 TL~ -.0.4253 g} ~ .q 'I' 1~:67,6875 PC ?.~ I,,, ! 0 ? ~,06,8125 4773 5999 106. ~7398 439. ! 406 4..0984 82.0:273 3.676O 525.F125 4,8875 3,6135 522.3125 20U0.6875 41.9180 4...1062 ~52,,6406 -090.2500 65.5898 34.!.140b PAL1 ~NRA u. A [., t C'. A l., I P, NRA CA[,I R {',,iRA 4.246~ 9.7832 3,6604 2.5569 9. 5008 3,g694 10,!895 3,9846 4,5 '1 g 9 10,0723 3,9846 2000.6875 ~.673B 4.3640 -agg 2500 R"5723 ~.5945 ................ ) ':( G !)AGE, 9 9 4 0 1. 66 73 6 ~g 0 1 60 . :.!_ T ',i 0 SIZE StOl., RFPB 1 68 00000000000000 00000000000000