Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-054 STATE OF ALASKA ■ DECEIVED ALASKA OIL AND GAS CONSERVATION COME ON WEL_ ..OMPLETION OR RECOMPLETION REPORT AND LOG JUL 16 2015 1a. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned H ' Suspended 0 1b.Well Citk ��j 20AAC 25.105 20AAC 25.110 Developmtnt-�)rxploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero • Service 0 Stratigraphic Test 0 -2. Operator Name: 6. Date Comp.,Susp.,c(Aband) 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 6/20/2015 • ` 196-054 - 315-133 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 4/4/1996 50-029-22662-00-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 4/23/1996 PBU S-42 • _ Surface: 4181'FSL,4503'FEL,Sec.35,T12N,R12E,UM ' 17. Field/Pool(s): 9. KB(ft above MSL): 71.79 Top of Productive Interval: 3902'FSL,3117'FEL,Sec.35.T12N,R12E,UM GL(ft above MSL): 37.1 PRUDHOE BAY,PRUDHOE OIL • Total Depth: 3340'FSL,4273'FEL,Sec.35,T12N,R12E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: • 3013'/3012' ADL 028257 ' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 618930• y- 5980385 • Zone - ASP4 .10692'/8964'. TPI: x- 620320 y- 5980128 Zone - ASP4 12. SSSV Depth(MD/TVD): PO Thickness of Permafrost MD/TVD: Total Depth:x- 619174 y- 5979547 Zone - ASP4 None 1900'(Approx.) 5. Directional Survey: Yes 0 (attached) No RI 13. Water Depth.if Offshore: 21. Re-drill/lateral Top Window MD/TVD: Submit electronic and printed information per 20 MC 25.050 N/A (ft MSL) N/A 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD,DIFT,ZDL,CN,GR,AC,RFT,FMT sowl 1 l�I(l F P 7 2 015 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 36' 116' 36' 116' 30" 260 sx Arctic Set(Approx.) 9-5/8" 40# L-80 35' 3078' 35 3078' 12-14" 850 sx CS III,300 sx Class'G',300 sx CS II 7" 26#/29 L-80/13Cr80 3077' 9376' 3076' 8781' 8-1/2" 270 sx Class'G',160 sx Class'G' 3043' 4-1/2" 12.6# 13Cr80 9214' 10692' 8669' 8964' 6" 175 sx Class'G' 24. Open to production or injection? Yes 0 No 0 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): 4-1/2"12.6#13Cr80 4500'-9150 9093 /8565 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? Yes 0 No RI ' Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED See Attached 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period �p Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate • Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only A.fj5 4�v-rz R/7._/ i S RBDM�L%.tU6 ? 8 01 .4) 73-7:r 'IG 28. CORE DATA Conventional Core(s) Yes 0 No 121 - Sidewall Cores Yes 0 No Il ' If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes ❑ No EI Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Sag River 9369' 8776' AAC 25.071. Shublik 9429' 8817' Sadlerochit 9728' 8891' Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Rose,John G Email: John.G.Rose@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist 1 Signature: pt +1907564-4091 Date: -//'k5/15 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only WELL NAME: S-42 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 9004 20 Bbls Class 'G' 8962' - 8967' Tubing Punch 6169' 86 Bbls Class 'G' 4500' Cut & Pull Tubing -3077 Cut & Pull 7" 3035' Set EZSV 3013' Set Whipstock S-42, Well History (Pre-Rig Sidetrack) T/I/O = 1660/1671/120. Temp =Sl. MIT-OA to 1200 psi (drilling screen). AL SI @ casing valve (1950 psi). OA FL near surface. Used 3.75 bbls/ Diesel to increase OAP from 122 psi to 1231 psi in 2/13/2015 30 min. 1st 15 min lost 29 psi. T/I/O = 1660/1680/180. Temp = SI. WHPs (Post MIT-IA). ALP = 1910 psi, SI @ casing valve. TP unchanged, IAP increased 10 psi & OAP increased 60 psi since 0200 hrs. 2/14/2015 SV, WV= C. SSV, MV= O. IA& OA= OTG. 1700 hrs. MIT-OA to 1200 psi PASSED (drilling screen). 2nd 15 min lost 5 psi for a total loss of 34 psi in 30 min. Bled OAP from 1197 psi to 120 psi in 15 min to slop tank (fluid/3.5 bbls returned). Tags hung. 2/14/2015 Final WHP's = 1660/1670/120. SV, WV= C. SSV, MV= 0. IA, OA= OTG. NOVP. 0200. T/I/0=1660/1680/180, Temp=Sl. PPPOT-T(PASS), PPPOT-IC (PASS), DRLG screen. PPPOT-T: Stung into test port(0+ psi), bled to 0 psi. Functioned LDS, all moved freely. Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port(200 psi), bled to 0 psi. Functioned LDS, all moved freely. Pumped through void, good returns. Pressured void to 3500 psi for 30 min 2/16/2015 test, lost 150 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. 3/29/2015 SET 4-1/2"WHIDDON CATCHER SUB @ 9,112' SLM /9,137' MD. T/I/0=1599/1612/184 Temp=S/I Assist SLB W/L&T, MIT-IA to 2500 PSI, **PASSED**(Pre rig) Pumped 5 bbls MEOH & 150 bbls crude for load. Pumped 1.15 bbls crude for MIT-IA. 1st 15 min IAP lost 47 &2nd 15 min IAP lost 23 for a total IAP loss of 70 in 30 min. Bled back-5 bbls. FWHP's=1789/468/126 **FLUID PACKED-watch for thermal exp** Upon departure DSO notified 3/30/2015 SLB still on well & in control of all WHV's Tags & annulus sign hung. PULLED ST#4 MODIFIED INT-OGLV FROM 6,757' SLM /6,770' MD. PULLED ST#5 MODIFIED INT-LGLV FROM 5,621' SLM/5,635' MD. PULLED ST#6 MODIFIED INT-LGLV FROM 3,458' SLM /3,476' MD. SET ST#6 MODIFIED INT-DGLV @ 3,458' SLM/3,476' MD. SET ST#5 MODIFIED INT-DGLV @ 5,621' SLM / 5,635' MD. SET ST#4 MODIFIED INT-DGLV @ 6,757' SLM /6,770' MD. PULLED EMPTY WHIDDON C-SUB FROM 9,112' SLM/9,137' MD. DRIFTED W/2.50" SAMPLE BAILER TO DEVIATION @ 9,544' SLM. UNABLE TO PURGE BALANCE LINE OR 3/30/2015 CONTROL LINE. ***DRIFTED TO 2,000' W/3.70"x 20' FOR SUBSIDENCE SURVEILLANCE***. 4/7/2015 BLED CONTROL AND BALANCE LINES TO Opsi. 4/26/2015 LRS heat transport of DSL to 70*for S-42 job. ***Fullbore/SLB CMT P&A Stage 1*** Initial WHP T/IA/OA; 1749/723/150 psi. SLB arrived on location and coordinated w/S Pad DSO. Opened Work Permit. Spot SLB pump equipment. R/U surface lines to well and support trucks and tanks. Hold PJSM w/SLB, CH2MHill, and BP. Perform low and high pressure test. Pump 10 bbls 50/50 Meth, 290 bbls 1% KCI, 20 bbls 15.8 ppg Class "G" CMT. Chase and spot CMT w/7 bbls 1% KCI and 133 bbls DSL. Estimated TOC @ 9150'. CIP @ 04:36. SLB UCA shows 200 psi compressive strength at 11:37:30. Shut in Well and RDMO SLB. 4/27/2015 SV, SSV, WV-Closed; MV-Open; IA, OA-OTG. Final WHP T/IA/OA; 1272/605/100 psi.. 5/3/2015 TAG TOP OF CEMENT @ 9,000' SLM W/2.50" SAMPLE BAILER (sample of cement). T/I/0=510/737/91, Temp=Sl MI-T to 2500 psi (PRE E-LINE TBG CUT) Pressured up tubing with 2 bbls diesel to reach 2514 psi. MIT-T lost 19 psi in 1st 15 minutes and 15 psi in 2nd 15 minutes for a total loss of 34 psi in a 30 minute test. Bled down tbg psi to 350 psi per E-line. E-line has well control 5/8/2015 upon departure. FWHPs'=350/750/91. S-42, Well History (Pre-Rig Sidetrack) (ELINE: TUBING PUNCH). INITIAL T/I/O = 350/750/90. LRS PERFORMED PASSING MIT-T TO 2500#. RIH W/ ELINE LOGGING TOOLS W/5' OF MEDIUM CHARGE TBG PUNCHER -TAGGED TOC @ 9004' -- SHOT TBG PUNCH HOLES @ 8962' - 8967'ACROSS COLLAR @ 8964'. TIED INTO TUBING TALLY DATED 23-APRIL-1996. VERIFIED GOOD COMMUNICATION BY PUMPING DOWN TBG TO SEE RESPONSE ON IA. FINAL T/I/O= 650/500/90. WELL LEFT 5/8/2015 SHUT IN UPON DEPARTURE - NOTIFIED PAD OP OF WELL STATUS. Job Scope: Stage 2 Balance Cement Plug T/I/O 275/210/100. R/U SLB & LRS. PJSM Have well control and fire drill. Go over well entry procedure. PT lines to 4000psi. Pumped 300 bbls of fresh water. Temp=88*. Pumped 86 bbls of diesel. Pumped 61 bbls of fresh water Temp=117*. Water to hot to pump cement. Make phone calls. Decision made to add additives to cement and continue cement job. Pump 86 bbls of 15.8 ppg of 15.8 Class "G" cement. Pumped 2 bbls of fresh water. Launched 7" foam balls. Pump 5 bbls of fresh water. Open all valves on ball launcher. Pump 43 bbls of fresh water. Total volume of fresh water after cement was 50 bbls, Pump 46 bbls of diesel for freeze protect. Close and cycle IA valves and SSV and Swab valve. T/I/O 0/0/100 Opertator notified on departure. Length of cement plug: 2835'. Depth of cement plug: 6169' md. Type of cement: Class"G" cement. Weight of cement: 15.8 ppg. Volume of cement slurry 5/11/2015 pumped: 86 bbls. UCA=2158 psi at 21:28:30. T/I/0=300/300/0 temp= S/I Assist SLB cementers ( Pre Rig) Assisted SLB cementers, Pumped a total of 132 bbls diesel down tbg to assist with cement job and to freeze protect IA and tbg. Final 5/11/2015 WHP's 0/0/100 SLB on well at departure 5/13/2015 RUNNING 2" CENT, 1-7/8" STEM, 1 3/4" SAMPLE BAILER. RUN 2" CENT, 1-7/8" STEM, 1-3/4" SAMPLE BAILER, S/D @ 6135' SLM WORK TO 6155' SLM, (sticky) RECOVER 2 CUPS WET CEMENT. BRUSH THRU BPV PROFILE W/4.5" BRUSH & 2.25" GAUGE RING, WORK 10' ABOVE AND BELOW PROFILE. RUN 2' x 1-7/8" STEM & 3.75" LIB 5/14/2015 BOBBLE THRU SSSV NIPPLE @ 2170' MD STOP © 5000' SLM, PAD OP NOTIFIED. T/I/0=84/vac/59 Temp=Sl CMIT-TxIA 2500 psi ***PASSED***on the 4th attempt, MIT-OA 3000 psi ***FAILED*** (Pre Rig). Pumped up TBGxIA pressure to 1300 psi with 1 bbl diesel to prevent production casing collapse during MIT-OA to 3000 psi. Pumped 1.5 bbls diesel down OA in attempt to MIT-OA to 3000 psi but lost pressure rapidly after reaching 1870 psi. Stopped pumping immediately. The OA proceeded to bleed itself down to 500 psi over a 10 minute period. Called 5/14/2015 WSL. Pumped 6 more bbls diesel down OA and established a LLR of 1 bpm at 1040 psi. T/I/O=84/vac/59 Temp=Sl CMIT-TxIA 2500 psi ***PASSED*** MIT-OA 3000 psi ***FAILED*** (Pre Rig) Pumped 4 bbls of 30*diesel down IA using 1/2 jumper to equalize TxIAP for CMIT TxIA to 2500 psi 1st test 1st 15 min T/IA lost 9/87 psi 2nd 15 min T/IA lost 24/52 psi for a total loss of 33/139 psi in 30 min 2nd test 1st 15 min T/IA lost 23/55 psi 2nd 15 min T/IA lost 15/41 psi for a total loss of 38/96 psi in 30 min 3rd test 1st 15 min T/IA lost 12/33 psi 2nd 15 min T/IA lost 11/26 psi for a total loss of 59/23 psi in 30 min 4th test 1st 15 min T/IA lost 6/18 psi 2nd 15 min T/IA lost 11/27 psi for a total loss of 17/45 psi in 30 min. Pumped up TBGxIA pressure to 1300 psi with 1 bbl diesel to prevent production casing collapse during MIT-OA to 3000 psi. Pumped 1.5 bbls diesel down OA in attempt to MIT-OA to 3000 psi but lost pressure rapidly after reaching 1870 psi. Stopped pumping immediately. The OA proceeded to bleed itself down to 500 psi over a 10 minute period. Called 5/14/2015 WSL. Pumped 6 more bbls diesel down OA and established a LLR of 1 bpm at 1040 psi. Continue rigging down. Valve positions: WV,SV= closed; MV, SSV= open; Annulus valves= OTG's. ALV= closed.Tags hung. Fluid packed annulus sign displayed. DSO notified of well status and of 5/15/2015 LRS departure. FWHP's 100/100/200. (ELINE TUBING CUT). INITIAL T/I/O = 100/200/200 PSI. RIH W/3.65" POWER JET CUTTER TOOLSTRING. TUBING CUT DEPTH=4500' MD TIED INTO TUBING TALLY DATED 4/23/96 BEFORE CUT T/I/0=85/180/220 PSI. AFTER SHOT T/I/0=95/100/220 PSI. GOOD INDICATION OF CUT AND T/IA COMMUNICATION. FINAL T/I/O = 75/80/200 PSI. WELL SHUT IN ON 5/17/2015 DEPARTURE. PAD OP NOTIFIED OF WELL STATUS S-42, Well History (Pre-Rig Sidetrack) T/I/0=56/78/217 CMIT TXIA**FAILED**Job turned over to DHD. (pre sidetrack) Pumped 2.5 bbls dsl to reach test pressure. Test#1 15 min TxIA lost 100/99 30 min TxIA lost 54/55. Total loss of 154/154 in 30 mins. Bump back to test pressure. Test#2 15 min TxIA lost 48/48 30 min TxIA lost 41/41. Total loss of 89/89 in 30 mins. Bump back to test pressure. Test#3 15 min TxIA lost 38/37 30 min TxIA lost 31/32. Total loss of 69/69 in 30 mins. Bleed TxIA back to 3/20. Repressure TxIA with 2.5 bbls diesel. Test#4 15 min TxIA lost 57/55 30 min TxIA lost 32/34. Total loss of 89/89 in 30 mins. Bump back to test pressure. Test#5 15 min TxIA lost 31/31 30 min TxIA lost 23/23. Total loss of 54/54 in 30 mins. Bleed TxIA back to 2/18. Bled back 3 bbls. Pad op notified of well status and tree valve positions as follows: SV,WV=closed. SSV, MV=open. IA and OA open to gauges. 5/18/2015 FWHP=10/26/165. **Fluid packed tags hung on IAV and WV**. **AFE sign in place on arrival**. T/I/O = 154/170/200. Temp = SI. CMIT-TxIA to 2500 psi - FAILED. (Pre Rig). AL SI @ casing valve (1940 psi). Used 2.25 bbls diesel to pressure TBG/IA from 154/170 psi to 2509/2530 psi. TBG/IA lost 83/82 psi in 1st 15 min, and 46/45 psi in 2nd 15 min for a total loss of 129/127 psi in 30 5/28/2015 min. Attempt#2 lost 42/41 in 1st 15 min, and 33/32 in 2nd 15 min fora total loss of 75/73. CMIT-TxIA to 2500 psi - FAILED (Pre Rig). Attempt#3 lost 34/34 psi in 1st 15 min, and 28/28 in 2nd 15 min for a total loss of 62/62 in 30 min. Established a LLR of.26 gpm. Bled TP & IAP from 2460/2480 psi to 0/0 psi in 30 min (3 bbls). Bled OAP from 160 psi to 0 psi in 10 min (.5 bbl). Job Complete. Tags &AFE sign hung. Final WHP's = 0/0/0. SV, WV= C. SSV, MV= 0. IA, OA= 5/29/2015 OTG. 0300. T/I/0=40/40/220. Temp = SI. WHP's (APE). AL SI @ casing valve (1010 psi). TP & IAP increased 40 psi, OAP increased 220 psi since 5/29/15. SV, WV, SSV= C. MV= 0. IA, OA= 6/3/2015 OTG. 2100. 6/8/2015 Road to loc big water puddle by well and tank called dewatering to suck it up. T/I/0=88/87/217 Circ-Out Pumpe 354 bbls 9.8 NaCi brine down IA taking returns up tbg to FL. Pumped 1 bbl meth and 3 bbl dsl. down IA and U-Tube to F/P TxIA. Pumped 4 bbls of diesel up FL 6/9/2015 to freeze protect. Final WHP - 300/290/200. AFE sign on well, caution tags hung. T/l.O= 0/0/0 Pumped up backside thru IA to 200 PSI; Installed 2nd (piggy back) IA Temp valve#36 onto existing IA valve, torqued to API sepecification & PT to 300 psi-lo & 3500 psi-high (passed). 6/11/2015 FWP=200/200/200 Note: Only getting 18-1/2 turns on 4" CIW MV (should be 23-1/2). T/I/O=SI/0/300. Start Barriers List= SSVxSV. Installed BPV#130, Tagged @125". Note: 21 turns 6/12/2015 were achieved in the MV. RDMO. Final T/I/0= BPV/0/300 T/I/O = BPV/30/210. Temp = SI. Bleed WHPs to 0 psi (pre RWO). Wellhouse, flowline, AL, scaffold disconnected. IA& OA FL @ suface. Bled OAP from 210 psi to 0+ psi in 5 min (10 gal). IAP decreased decreased 13 psi during bleed. Bled IAP from 17 psi to 0+ psi in 1 min (2 gal) . During bleed OAP increased 40 psi. Bled OAP to 0+ psi in 1 min (1 gal). Held open bleed for 1 hr 30 min. Monitored for 30 min. IAP unchanged, OAP increased 20 psi. Valve crew in control of valves upon 6/13/2015 departure. 1300. T/I/O=BPV/0/0. Pre Parker 273. N/D 4" CIW tree and N/U dryhole (temp valves#35, #70) and pulled 6/13/2015 4" BPV#130, Set 4"TWC#296, Installed temp#03 on OA as piggyback. Final WHP's TWC/0/0. North America-ALASKA-BP Page 1 af34 Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date: X3-016TH-C:(8,089 714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual @82.68usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/14/2015 00:00 - 02:30 2.50 I RIGD P PRE **RELEASE FROM RIG MAINTENANCE AT 06-14-2014 AT 00:00** PREP FLOOR FOR RIG MOVE I -PJSM I-RIG DOWN FLOOR PERFORM DERRICK INSPECTION I I 1 -REMOVE ROOF TOP WALKWAYS -POWER WASH INSIDE DERRICK WALLS -SKID CATTLE SHOOT 02.30 - 04 30 2.00 RIGD P PRE LOWER DERRICK I -PJSM I-SKID RIG FLOOR I-LAY DERRICK DOWN ON HEADACHE RACK I I :377K "SET DUMMY WELLHOUSE AT S-PAD" 04:30 - 08:00 3.50 RIGD P PRE SEPARATE MODULES AND STAGE AT CC2A PAD ENTRANCE -REMOVE ROOF TOP TRANSITION PLATES UNHOOK UM AND DM ELECTRICAL CABLES -START DM GENSET 108:00 - 12:00 4.00 MOB P PRE ,MOVE MODULES FROM CC2ATO N-PAD I ACCESS ROAD _ ,-MOVE ALL THREE MODULES TOGETHER 12:00 - 19:00 7.00 1 MOB P PRE I MOVE MODULES FROM N-PAD ACCESS ROAD TO S-PAD 1-MOVE ALL THREE MODULES TOGETHER 19:00 - 22:00 3.00 MOB P PRE SPOT OVER S-42A MATE MODULES /TOGETHER 1-SPOT DRILL MOD OVER S-42A -MATE MUD MOD WITH DRILL MOD UTILITY MOD WITH DRILL MOD 22 00 - 00:00 2.00 MOB P PRE RIG UP -RIG UP ELECTRICAL AND UTILITY INTERCONNECTS 1 I -CONNECT STEAM,ELECTRICAL PLUG BOARD,ROOF AND FLOOR PANELS 6152015 0000 - 02:30 2.50 MOB P PRE RAISE DERRICK AND SKID RIG FLOOR -PJSM -RAISE DERRICK,LIFT OFF HEADACHE AT i 520K,MAX PULL 526K , 1 I -SKID RIG FLOOR -RAISE PIPE CAT , 1 -SKID CATTLE SHOOT INSTALL MANRIDER WINCHES INSTALL TORQUE TUBE PIN 02:30 - 03:30 1.00 I MOB P I I PRE BRIDLE DOWN BRIDLE DOWN AND SECURE BRIDLE LINES **SIMOPS** -SPOT FLOWBACK TANK RIG UP HARDLINES AND CHOKE SKID Printed 7/6/2015 10 53 33AM North America-ALASKA-BP Page 2 c444" Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date: X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual©82.68usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) —_ -..__ I (usft) ; 03:30 - 09:00 5.50 MOB P PRE CONTINUE RIG UP -HANG RIG TONGS '-INSTALL MUD,CEMENT,AND BLEEDER LINES TO RIG FLOOR -MAKE UP FLOW AND FILL LINES -SPOT CUTTINGS TANK •**ACCEPT RIG AT 09:00 ON 06/15/2015 09:00 - 12:00 3.00 RIGU P PRE RIG UP DSM LUBRICATOR -PJSM WITH DSM AND RIG CREW -RIG UP PER LUBRICATOR PER DSM 1-PRESSURE TEST LUBRICATOR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH 12:00 - 13:00 1.00 DHB P ' DECOMP PULL BACK PRESSURE VALVE j-PULL BACK PRESSURE VALVE PER DSM • I-RIG DOWN LUBRICATOR 13:00 - 15:30 2.50 WHSUR I P DECOMP CIRCULATE OUT FREEZE PROTECT -PJSM PRIOR TO CIRCULATION CIRCULATE DOWN TUBING AND UP IA -PUMP INITIAL 10 BBLS TO TIGER TANK -PUMP 128 BBLS TO THE PITS -PUMP 15 BBLS TO TIGER TANK MONITOR WELL FOR 10 MINUTES:WELL - ,STATIC -BLOW DOWN AND RIG DOWN LINES 15:30 - 18:00 2.50 DHB P DECOMP INSTALL TWO WAY CHECK I PJSM WITH DSM AND RIG CREW RIG UP LUBRICATOR PER DSM -PRESSURE TEST LUBRICATOR TO 250 PSI LOW,3500 PSI HIGH FOR 5 MIN EACH PRESSURE TEST TWO WAY CHECK TO 250 • - PSI LOW,3500 PSI HIGH FOR 5 MIN EACH FROM ABOVE AND BELOW -BLEED OFF PRESSURE AND RIG DOWN LUBRICATOR 18:00 - 19:00 1.00 DHB P 1 , DECOMP HOLD RIG EVAC DRILL WITH JAMES HUNDLEY CREW } -AAR WITH RIG CREW 19:00 - 23:00 4.00WHSUR P ! DECOMP i s NIPPLE DOWN DRY HOLE TREE AND ADAPTOR FLANGE -PJSM WITH FMC AND RIG CREW • -ATTEMPT TO PULL TREE WITH 5K TREE • ' : CRANE,NO SUCCESS • -ATTEMPT TO PULL TREE WITH 10K FLOOR TUGGERS,NO SUCCESS -RIG UP TO PULL TREE WITH TOP DRIVE, • PULL 15K,NO SUCCESS • -HEAT AND STEAM WELLHEAD • -ATTEMPT TO PULL TREE WITH 15K FROM TOP DRIVE.NO SUCCESS -RIG UP PORTA-POWERS ON TREE -PULL 15K WITH TOP DRIVE TO PULL TREE -LAYDOWN TREE ' -CLEAN RING GROOVE AND MAKE UP , CROSS OVER TO HANGER -8 TURNS TO MAKE UP 23:00 - 00:00 1.00 BOPSUR P r DECOMP 'NIPPLE UP HIGH PRESSURE RISER -PJSM WITH RIG CREW i '-MAKE UP TO WELLHEAD AND TORQUE BOLTS Printed 7/6/2015 10:53 33AM North America-ALASKA-BP Page 3044" Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual @82.68usft(above Mean Sea Level) Date j From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/16/2015 100:00 - 03:00 3.00 BOPSUR P DECOMP CONTINUE NIPPLE UP HIGH PRESSURE i RISER I-PJSM WITH RIG CREW -ADD SPACER SPOOL TO RISER -NIPPLE UP TO TUBING SPOOL 03:00 - 06:00 3.00 BOPSUR P DECOMP ,NIPPLE UP BOP I -PJSM WITH RIG CREW INSTALL API RING ONTO HIGH PRESSURE RISER I BREAK BOP FROM STUMP -POSITION AND LOWER BOP ONTO HIGH PRESSU E RISER ER S -TORQUE CONNECTIONS BETWEEN RAMS AND MUD CROSS 06:00 - 09:00 3.00 BOPSUR P DECOMP I CHANGE OUT ANNULAR API RING -BREAK ANNULAR FROM BOP STACK -REPLACE 5 STUDS -INSTALL NEW API RING AND LOWER I I ANNULAR BACK ONTO STACK -INSTALL AND TORQUE CONNECTION 'BETWEEN ANNULAR AND DOUBLE GATE -I 09.00 - 10 00 1.00 BOPSUR P DECOMP NIPPLE UP LOW PRESSURE EQUIPMENT -N/U FLOW NIPPLE TO FLOW BOX ;-INFLATE AIR BOOT -RIG UP FLOWAND FILL LINES 10:00 - 12:00 2.00 BOPSUR P I DECOMP PRESSURE TEST BOP -TEST BOP ACCORDING TO AOGCC,BP AND i PARKER REQUIREMENTS -TEST BOP TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES EACH I -TEST WITH 4",4-1/2",AND 7"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED -TEST WITNESS WAIVED BY AOGCC REP JEFF JONES BOP CONFIGURATION FROM TOP TO BOTTOM:ANNULAR PREVENTER,7"CASING RAMS,BLIND SHEAR RAMS,MUD CROSS, 2-7/8"X 5-1/2"VBRS 12:00 - 13:30 1.50 BOPSUR N SFAL -1.37 DECOMP CHANGE OUT DOOR SEAL ON LOWER RAMS -POOH WITH TEST JOINT -DE-ENERGIZE ACCUMULATOR -C/O SEAL -RE-ENERGIZE ACCUMULATOR 13:30 - 14:30 1.00 BOPSUR N SFAL -1.37 DECOMP RIG UP TEST EQUIPMENT -FILL WITH TEST FLUID,PURGE SYSTEM OF ' AIR -RIH WITH TEST JOINT 14:30 - 20:00 5.50 BOPSUR P DECOMP PRESSURE TEST BOP -TEST BOP ACCORDING TO AOGCC,BP AND PARKER REQUIREMENTS -TEST BOP TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 4",4-1/2",AND 7"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED -TEST WITNESS WAIVED BY AOGCC REP JEFF JONES ' -BOP CONFIGURATION FROM TOP TO BOTTOM:ANNULAR PREVENTER,7"CASING RAMS,BLIND SHEAR RAMS,MUD CROSS, 2-7/8"X 5"VBRS Printed 7/6/2015 10:53.33AM North America-ALASKA-BP Page 4 afa4 Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date. X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual©82.68usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 20:30 0.50 BOPSUR P DECOMP RIG DOWN BOP TEST EQUIPMENT BLOW DOWN TEST EQUIPMENT PULL TEST JOINT AND TEST PLUG 20:30 - 23:30 3.00 BOPSUR , P I DECOMP RIG UP DUTCH RISER SYSTEM -P/U AND R/U LUBRICATOR -PRESSURE TEST LUBRICATOR,250 PSI LOW/3500 PSI HIGH FOR 5 MIN EACH -PULL BPV AS PER DSM -R/D LUBRICATOR AND DUTCH RISER WSEQI ISYSTEM I 23:30 - 00:00 0.50 BOPSUR N -1.37 DECOMP COMMISSION AMPHION SYSTEM AS PER NOV !REP **MAINTENANCE AFE** 6/17/2015 00:00 - 01:30 1.50 PULL N WSEQ -1.37 DECOMP ,COMMISSION AMPHION AS PER NOV REP **MAINTENANCE AFE** I 01:30 - 04:00 2.50 I PULL P DECOMP PULL FMC TUBING HANGER I-RIG UP 4-1/2"HANDLING EQUIPMENT STAGE CONTROL LINE SPOOLER ON RIG FLOOR DRAIN STACK i i-RUN IN HOLE AND ENGAGE LANDING JOINT IN NSCT TUBING HANGER WITH 8 TURNS FMC BACK OUT LOCK DOWN SCREWS,4.75" }OUT,3.75"IN -PULL HANGER OFF SEAT AT 85K LBS (INCLUDING 35K TOP DRIVE) 04:00 - 05-30 1.50 PULL P DECOMP CIRCULATE 2 X BOTTOMS UP -PULL LANDING JOINT AND HANGER TO RIG FLOOR -CIRCULATE 9.5 PPG BRINE -PUMP AT 338 GPM,430 PSI -MONITOR WELL FOR 10 MIN PRIOR TO PULLING HANGER TO FLOOR:WELL IS I STATIC ! LAY DOWN LANDING JOINT AND HANGER 05:30 - 12:00 6.50 y PULL P DECOMP I POOH WITH 4-1/2"12.6#CR-NSCT TUBING I-LAY DOWN 1 X 1 IN PIPE SHED -POOH FROM 4,500'MD , -SPOOL CONTROL LINE WITH SLB SPOOLER -P/U=54K,S/O=54K AT 2,470'MD -AT 2170 FT DISCONNECT CONTROL LINE FROM SVLN -LAY DOWN SVLN -REMOVE CONTROL LINE SPOOLER FROM RIG FLOOR -UTILIZE AIR TOOL TO TAKE OFF CONTROL LINE BANDS -RECOVER 46 STEEL BANDS 8110 JOINTS OF TUBING -CUT JOINT 2.06 FT -MONITOR TRIP VIA TRIP TANK PROPER 1 DISPLACEMENT 12:00 - 14:00 2.00 PULL P DECOMP RIG DOWN TUBING HANDLING EQUIPMENT -RIG DOWN CASING TONGS AND SEND OFF FLOOR STAGE CASING CUTTING ASSEMBLY TO RIG FLOOR -CLEAN AND CLEAR RIG FLOOR -INSTALL 7-1/8"WEAR RING Printed 7/6/2015 10:53.33AM North America-ALASKA-BP Page 5 ca24 Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date: X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual©82.68usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 14:300.50 PULL P DECOMP !PICK UP 7"CASING CUTTER BHA#1 -MAKE UP 7"CASING CUTTER AS PER BAKER REP i I BAKER MSC,STABILIZER,XO 14:30 - 19:30 5.00 PULL P DECOMP 'RIH ON ELEVATORS WITH 7"CASING CUTTER i BHA#1 FROM SURFACE TO 3,085'MD -RIH PICKING UP 4"XT-39 DP SINGLES FROM 'SHED RIH AT 150 FT/MIN -P/U=70K,S/O=70K -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 19:30 - 20:30 1.00 PULL P DECOMP !CUT 7"CASING -P/U 1 STAND AND MAKE UP TOP DRIVE -OBTAIN CUTTING PARAMETERS -P/U=70K,S/0=70K,80 RPM 1K TORQUE LOCATE COLLARS AT 3,008'MD,3,047'MD, AND 3,086'MD -P/U 5 FT&CUT 7"CASING AT 3,081'MD PER I . i !BAKER !-PUMP AT 168 GPM AND 700 PSI iPRESSURE DROP TO 450 PSI I-OBSERVE 450 PSI ON OA CONTINUE ROTATING FOR 15 MINS -GOOD INDICATION OF CUT 20'30 - 22:30 2.00 PULL I P DECOMP CIRCULATE OUT DEAD CRUDE FROM T'X 9-5/8"OUTER ANNULUS -CLOSE ANNULAR AND OPEN OA TO FLOW BACK TANK -ICP:168 GPM,880 PSI -FCP:168 GPM,660 PSI C ,-PUMP 25 BBL HI VIS SWEEP -PUMP 100 BBL 9.5 PPG BRINE -PUMP 40 BBL DEEP CLEAN PILL PUMP 120 BBL 9.5 PPG BRINE -CATCH SAMPLES AT WELLHEAD FIRST SAMPLE DEAD CRUDE -SECOND E L DEEP CLEAN PILL,NO OIL -THIRD SAMPLE 9.5 PPG BRINE,NO OIL -GOOD INDICATIONS OF CLEAN 9.5 PPG BRINE AROUND -MONITOR WELL FOR 10 MIN:WELL STATIC -SHUT IN OA&BLOW DOWN LINE TO TANK 22'30 - 23:30 1.00 PULL P DECOMP RIG UP TO PUMP DOWN DS TAKING RETURNS OUT OA TO PITS THRU MUD GAS SEPARATOR -DISCUSS WITH ODE,DECISION TO CIRCULATE AT HIGHER RATE MADE -HIGH PRESSURES SEEN AT 168 GPM TO FLOW BACK TANK,LINEUP THRU RIG SYSTEM TO INCREASE RATE TO 210 GPM -STAGE PUMPS UP TO 210 GPM,1350 PSI 23 30 - 00 00 0.50 PULL P DECOMP POH ON ELEVATORS WITH 7"CASING CUTTING BHA#1 FROM 3,081'MD TO 2,279' MD -MONITOR WELL FOR 10 MIN:WELL STATIC -BRINE WEIGHT:9.5 PPG IN,9.5 PPG OUT -STAND BACK 4"XT-39 DP -P/U=60K,S/0=60K -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT Printed 7/6/2015 10•53:33AM North America-ALASKA-BP Page 6 cab- Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date: X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual c 82.68usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth 1 Phase Description of Operations — (hr) (usft) 1 6/18/2015 00:00 - 01:00 1.00 PULL P DECOMP POH ON ELEVATORS WITH T'CASING CUTTING BHA#1 FROM 2,279'MD TO SURFACE -BRINE WEIGHT:9.5 PPG IN,9.5 PPG OUT -STAND BACK 4"XT-39 DP -P/U=60K,S/O=60KAT 2,279'MD j -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 01:00 - 02:00 1.00 PULL P i DECOMP UD 7"CASING CUTTING BHA#1 -L/D STABILIZER,XO,&CUTTER AS PER BAKER -GOOD INDICATIONS OF CUT ON CUTTER -PULL WEAR RING 02:00 - 03:00 1.00 I PULL P DECOMP M/U PACKOFF PULLING TOOL I -RIH AND ENGAGE PACKOFF -BACK OUT LOCK DOWN SCREWS AS PER . FMC ' -PULL PACKOFF OUT -UD PACKOFF PULLING TOOL "SIMOPS:RIG UP DOYON CASING EQUIPTMENT :03:00 - 03:30 0.50 PULL • P , DECOMP M/U 7"SPEAR ASSEMBLY BHA#2 I -RIH AND ENGAGE 7"CASING i i-PICKUP TO UNSEAT HANGER,P/U=97K '03:30 - 04:00 0.50 PULL � P DECOMP CIRCULATE BOTTOMS UP X 2 -336 GPM,336 PSI -CONTAMINATED,UNSET CEMENT RETURNS SEEN ACROSS SHAKERS 04:00 04.30 0.50 PULL I P DECOMP PULL AND LAY DOWN 7"CASING HANGER -MONITOR WELL FOR 10 MIN:WELL STATIC -DISENGAGE SPEAR&LAY DOWN HANGER 04:30 - 08:00 3.50 PULL PDECOMP PULL 7"26#,L-80 CASING FROM 3,081'MD TO SURFACE -LAY DOWN 1 X 1 IN PIPE SHED CASING IN GOOD CONDITION,NO NOTICEABLE ISSUES I LAY DOWN 76 FULL JOINTS :-CUT JOINT:35.18 FT WITH 7.75"FLARE ' -NORM ALL CASING PULLED -MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT 08:00 - 09:30 1.50 PULL P DECOMP R/D 7"DOYON CASING EQUIPMENT -CHANGE ELEVATORS FROM SIDE DOOR TO DP -CLEAN AND CLEAR RIG FLOOR -INSTALL 9-1/8"WEAR RING 09:30 - 10:00 0.50 PULL P DECOMP 'RIG SERVICE -SERVICE TOP DRIVE,GREASE BLOCKS, _ _ PERFORM DERRICK INSPECTION 10:00 - 15:00 5.00 PULL P DECOMP MAKE UP CLEAN OUT BHA#3 FROM I SURFACE TO 793'MD -8.5"USED BIT,(2)7"BOOT BASKETS,BIT SUB,8.5"UPPER WATERMELON MILL, BUMPER SUB,OIL JAR,(9)6.25"DRILL COLLARS,(15)5"HWDP,XO -P/U=75K,S/O=75K Printed 7/6/2015 10:53:33AM North America-ALASKA-BP Page 7 c..‘ Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date: X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual©82.68usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth i Phase Description of Operations 15:00 - 18:30 3.50 PULL P DECOMP RIH WITH CLEAN OUT BHA#3 FROM 793'MD TO 7"CASING STUB AT 3,081'MD PICK UP 4"XT-39 DP SINGLES FROM SHED -FILL PIPE EVERY 20 STANDS j I-P/U=105K,S/O=103K 1 -MONITOR WELL VIA TRIP TANK:PROPER I DISPLACEMENT 18:30 - 19:30 1.00 PULL P DECOMP CIRCULATE WELL CLEAN • -PUMP 20 BBL HI VIS SWEEP -600 GPM,1200 PSI -RECIPROCATE PIPE 90' i-MONITOR WELL FOR 10 MIN:WELL STATIC 19:30 - 23:30 4.00 PULL P DECOMP !CUT AND SLIP DRILLING LINE -CUT 105 WRAPS FOR 892'OF LINE I-CALIBRATE AMPHION SYSTEM CHECK COM — —t – - 23:30 - 00:00 0.50 PULL P DECOMP I POOH WITH CLEAN OUT BHA#3 FROM 3,050' MD TO 1,940'MD -MONITOR WELL FOR 10 MIN:WELL STATIC ,-BRINE WEIGHT:9.5 PPG IN,9.5 PPG OUT i P/U=90K,S/0=90K AT 1,940'MD i I ,-MONITORWELLVIATRIPTANK:PROPER DISPLACEMENT 6/19/2015 00-00 - 02:30 2.50 PULL P DECOMP i POOH WITH CLEAN OUT BHA#3 FROM 1,940' MD TO SURFACE -P/U=90K,S/0=90KAT1,940'MD -BRINE WEIGHT:9.5 PPG IN,9.5 PPG OUT I I •-STAND BACK HWDP AND DC i -MONITOR WELL VIA TRIP TANK:PROPER --7 + . -- DISPLACEMENT 02-30 - 04:00 1.50 PULL P • DECOMP RIG UP HES E-LINE •-CLEAN AND CLEAR RIG FLOOR RIG UP SHEAVES AND BRING TOOLS TO RIG • FLOOR ' -MAKE UP TOOLS AS PER HES -MAKE UP EZSV/CCLAS PER HES 04:00 - 09 30 5.50 PULL P DECOMP RIH AND SET HES 9-5/8"EZSV(7.75"OD) -RIH WITH EZSV/CCL FROM SURFACE TO TUBING STUB AT 3080'MD ELMD • -LOG UP FROM 3,080'ELMD -UNCERTAINTY ON COLLAR LOCATIONS, POOH AND ADD WEIGHT BARS -RIH FOR SECOND LOGGING RUN i -RIH TO 3,080'ELMD,LOCATE COLLARS,ALL COLLARS SHOWING -PUT EZSVAT 3,034'ELMD,5'ABOVE COLLAR -SET TOP OF EZSVAT 3034'ELMD,8'ABOVE CASING COLLAR -BOTTOM OF EZSVAT 3037'ELMD -PULL OUT OF HOLE AND RID E-LINE Printed 7/6/2015 10-53 33AM North America-ALASKA-BP Page 8 a - Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual©82.68usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) i (usft) - N SFAL -1.37 . DECOMP ATTEMPT TO PRESSURE TEST EZSV TO 250 09:30 13:00 3.50 PULL i 'PSI LOW FOR 5 MIN,3000 PSI HIGH FOR 30 MIN EACH -GOOD 250 PSI LOW PRESSURE TEST PRESSURE UP TO 3000 PSI,PRESSURE LEAKING OFF -TROUBLESHOOT SURFACE SYSTEM,GLAND L NUT ON CASING SPOOL LEAKING -TIGHTEN GLAND NUT ' I-GOOD 250 PSI LOW TEST PRESSURE UP TO 3000 PSI,FLANGE LEAKING BETWEEN CASING SPOOL AND TUBING SPOOL CALL FMC TO TROUBLESHOOT •-FMC TORQUED ALL BOLTS ON FLANGE CONNECTION BETWEEN CASING AND TUBING SPOOL -GOOD 250 PSI TEST -PRESSURE UP TO 3000 PSI,GLAND NUT LEAKING ON SPOOL .-FMC TORQUED GLAND NUT 13:00 - 14:00 1.00 PULL ' P r DECOMP I PRESSURE TEST EZSV TO 250 PSI LOW FOR 5 MIN,3000 PSI HIGH FOR 30 MIN EACH '-GOOD 250 PSI LOW TEST -GOOD 3000 PSI HIGH TEST i '-NOTIFIED WTLAND RECEIVED APPROVAL _� -TEST CHARTED AND ATTACHED 14:00 - 14-30 0.50 PULL I P DECOMP RIG SERVICE SERVICE RIG FLOOR EQUIPMENT —._ + -- — -GREASE TOP DRIVE 14:30 - 15:30 1.00 STWHIP P WEXIT •RIG UP SPERRY E-LINE FOR GYRO TO -i ORIENT WHIPSTOCK 15:30 - 18:00 2.50 STWHIP P WEXIT CHANGE OUT UPPER PIPE RAM FROM 7"TO : 2-7/8"X 5-1/2"VBRS PULL 9-1/8"WEAR RING -M/U 4"TEST JOINT I CLOSE BLIND RAMS • -DE-ENERGIZE ACCUMULATOR -C/O RAMS FROM 7"TO 2-7/8"X 5-1/2"VBRS -RE-ENERGIZE ACCUMULATOR -INSTALL TEST PLUG,TEST WITH 4"TEST I JOINT -250 PSI LOW,3500 PSI HIGH ' ' : •-PULL TEST PLUG,INSTALL 9-1/8"WEAR RING ' j -R/D TEST EQUIPMENT -OPEN BLIND RAMS -CLEAN AND CLEAR RIG FLOOR -BOP CONFIGURATION FROM TOP TO BOTTOM:ANNULAR PREVENTER,2-7/8"X 5" VBRS,BLIND SHEAR RAMS,MUD CROSS, 2-7/8"X 5-1/2"VBRS Printed 7/6/2015 10:53:33AM North America-ALASKA-BP Page 9 Gly. Operation Summary Report Common Well Name S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date: X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual @82.68usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) {, 18:00 - 21:00 3.00 STWHIP P WEXIT MAKEUP BAKER WHIPSTOCK ASSEMBLY ,FROM SURFACE TO 835'MD -MAKEUP 9-5/8"GEN II 3-STRING MILL AND I LEAD MILL ASSEMBLY ! ,-CONFIRM ANCHOR SET FOR 20 KLBS SHEAR AND REMOVAL OF SHIPPING PIN -BKR REP AND SLB DD ON RIG FLOOR ORIENT UBHO WITH WHIPSTOCK HIGHSIDE AND CONFIRM GYRO DATA TOOL PROPERLY I ORIENTED 1-RIH 9 X 6 1/2"DRILL COLLARS -RIH WITH 15 JTS 5"HWDP P/U=75K,S/O=75K 21:00 - 23:00 2.00 STWHIP P WEXIT RIH WITH WHIPSTOCK/MILLING BHA#4 FROM 835'MD TO 3,000'MD ' -RIH WITH 4"DP FROM DERRICK -P/U=105K,S/O=105K FILL PIPE EVERY 20 STANDS -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 23:00 - 00:00 1.00 STWHIP P WEXIT I RIH GYRODATA TO ORIENT WHIPSTOCK !-R/U GYRODATA RIH AND ORIENT WHIPSTOCK 64 DEG GTF AS PER SLB&GYRODATA ' -POOH AND R/D ELINE I 6/20/2015 100:00 - 01:00 1.00 STWHIP P WEXIT SET WHIPSTOCK AS PER BAKER REP -RIH AND TAG EZSV AT 3,035'MD -P/U=105K,S/O=105K I-STACK 20K TO SHEAR ANCHOR ' -P/U 5K OVERPULL TO CONFIRM ANCHOR ;SET -STACK 40K TO SHEAR MILLING ASSEMBLY -P/U TO CONFIRM ASSEMBLY FREE.P/U 101K -PROJECTED WINDOW:TOW 3,013'MD, 'BOW:3,030'MD 01:00 - 02:00 1.00 STWHIP P WEXIT DISPLACE WELL FROM 9.5 PPG BRINE TO 9.3 PPG MILLING FLUID -256 GPM,325 PSI -PUMP 30 BBL HI VIS SWEEP SPACER -PUMP 236 BBLS MILLING FLUID 02:00 - 10:30 8.50 STWHIP P WEXIT KICKOFF S-42A SIDETRACK AND MILL >\— - I WINDOW 1 -MILL WINDOW IN 9-5/8"CASING WITH 8.1/2" S Vn MILLING ASSEMBLY N T -MILL FROM 3,013'MD TO 3,049'MD -450 GPM,725 PSI ' -80 RPM,3-6K TORQUE I -WOB:3-4K -P/U=103K,S/O=103K,ROT=103K -CEMENT OBSERVED BEHIND CASING -PUMP TWO 20 BBL HIGH VIS SWEEPS DURING MILLING AT 3,020'MD AND 3,029'MD -WORK MILLS THRU WINDOW MULTIPLE 'TIMES TO ENSURE SMOOTH WINDOW -NO DRAG TOP OF WINDOW:3,013'MD,3,013'TVD MIDDLE OF WINDOW:3,021'MD,3,021'TVD BOTTOM OF WINDOW.3,030'MD,3,030'TVD Printed 7/6/2015 10:53 33AM North America-ALASKA-BP Page 10 afJ Operation Summary Report Common Well Name:S-42 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/14/2015 End Date. X3-016TH-C:(8,089,714.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:4/4/1996 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292266200 Active datum:S-42A actual(d182.68usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 110:30 - 11:30 1.00 STWHIP P I WEXIT I CIRCULATE BOTTOMS UP 2 TIMES •• -PUMP 35 BBL HIGH VIS SWEEP WITH SUPERSWEEP MATERIAL -550 GPM,923 PSI 1-MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT ' -MONITOR WELL FOR 10 MIN:WELL STATIC 11:30 - 13'00 1.50 STWHIP P WEXIT j PERFORM LEAK-OFF TEST "-MUD WEIGHT:9.3 PPG,3,020'TVD -PUMP 1.8 BBLS AT 0.75 BPM,PRESSURE ' BROKE OVER AT 850 PSI,BLEED BACK 1.5 BBLS '-ACHIEVE 14.7 PPG FIT,>50 BBL KICK ,TOLERANCE DISCUSS RESULTS WITH ODE -BLOW DOWN TEST EQUIPMENT I-SEE ATTACHED DOCUMENTATION 13:00 14:30 1.50 STWHIP P WEXIT CIRCULATE HOLE CLEAN TO ENSURE METAL SHAVINGS OUT OF HOLE -550 GPM,900 PSI -OBTAIN SPR'S 14:30 - 15:30 ;1.00 STWHIP P —i. WEXIT POOH WITH MILLING BHA#4 FROM 3,049'MD l ;TO 800'MD j-MONITOR WELL FOR 10 MINUTES:WELL STATIC j-P/U=100K,S/O=100K 1 II � -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT H MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT 15.30 - 18:00 2.50 STWHIP P WEXIT UD MILLING BHA#3 FROM 800'MD TO SURFACE -MONITOR WELL FOR 10 MINUTES BEFORE PULLING NON SHEARABLES ACROSS STACK WELL STATIC • -UD 6-1/4"DRILL COLLARS ' STAND BACK 5"HWDP WINDOW MILL 1/4"UNDERGAUGE I -ALL WATERMELON MILLS IN GAUGE I -P/U=70K,S/O=70K 1 •-CLEAN AND CLEAR RIG FLOOR 18.00 - 19:00 1.00 STWHIP P I WEXIT FLUSH STACK AND FUNCTION BOP ELEMENTS I -PULL 9-1/8"WEAR RING -FLUSH BOP WITH BOP WASHING TOOL -FUNCTION RAMS -BLOW DOWN CHOKE AND KILL LINES -DRAIN STACK -INSTALL 9-1/8"WEAR RING 19.00 - 22:00 3.00 DRILL P INTI •MAKE UP 8.5"MOTOR DRILLING BHA#4 FROM SURFACE TO 770'MD -M/U AS PER SLB DD/MWD,GYRODATA -P/U=70K,S/O=70K -8-1/2"MILLED TOOTH BIT,6-3/4"XP MOTOR 1.5 DEG,8-3/8 NM STAB,NM XO.GYROPULSE 675,TELESCOPE 675 MWD,ARC 675 LWD,XO, • 8-3/8"NM STABILIZER,(3)FLEX COLLAR, FLOAT SUB,(12JTS)5"HWDP, HYDRAULIC JARS,(5 JTS)5"HWDP,XO Printed 7/6/2015 10:53:33AM HILL- 4"CNV WELLHEAD= FMC S-42 SAFETY NOTES: ***CHROME TBG,CSG 8 LNR*** ACTUATOR= BAKER C WELL ANGLE>70*@ 9536'***MAX DOGLEG: OKB.B_EV= 71.79 1 34.8'@ 9325"*• BF.ELEV= 37.76' KOP= 3787' ' # ? 3013' -i9-5/8"WHIPSTOCK(06/20/15) Nfax Angle= 87'@ 9361' — miiii Datum NO= 9549' —# ' 3035' H9-5/8"EZSV(06/19/15) Datum TVD= 8800'SS D= " 9-5/8"CGS,40#,L-80 BTRS,D=8.835" — 3077' GAS LFT MANDRELS 7"CSG CUT(06/17/15) —1-307T ELMD / ( ST MD TVD DEV TYPE VLV LATCH PORT DATE 4-1/2"TBG CUT(05/17/5) H14500'ELM ---------- 6 3476 3474 6 KBG-2-LS DMY NT 0 03/30/15 5 5635 5254 43 KBG-2-LS DMY NT 0 03/30/15 ESTMATED TOP OF CMT PLUG(05/11/15) H 6169' f..!' 4 6770 6253 8 KBG-2-LS DMY NT 0 03/30/15 (Minimum ID =3.725" 9137' • 3 7513 6994 1 KBG-2-LS DAY NT 0 05/16/07 ;;• ' • 2 8264 7745 0 KBG-2-LS DMY NT 0 12/18/11 I4-1/2" HES XN NIPPLE } 1 9014 8492 20 KBG-2-LS DMY NT 0 07/19/98 •:w'.+4 ® NOTE MANDRELS REQUIREMODIFTINTEGRAL VALVES 7'CSG,26#,L-80 BTC,ID=6.276" -1 8408' I—>4 ,. ,K ,.... ...*.* TLBNG PUNCH(05/08/15) — 8967 -8967 ■' '.' ' .f}' 9081' H4-1/2"FES X-NP,ID=3.813" ..*!_1 .4~ f ��, �� 9092' —{7"X 4-1/2"BKR S-3 FKR,0=3.875" ty' 9115' —H4-112"HES X NP,0=3.813" ,..k 4 *f. r or 9137 {4-1/2"HES XN NP,D=3.725" 4-1/2"TBG,12.6#,CR-NSCT, —I 9148' %%• .0152 bpf,D=3.958' kwh�. -1 9149' 44-1/2"WLEG,D=4.00" ESTIMATED TOP OF CEMENT(04/27/15) — —9150' :f! ii"• ►.+'� v 9152' �E-MD TT LOGGED 08/11/96 rs"4:*: }: a....+. '�c..y.s.* TOP OF 4-1/2"LNR —1 9214' A 9214' 7'X 4-1/2"TM/TIB3ACK SLV,ID=5.277" + `f›; _ 9224' T X 4-1/2"TNN WT SET PKR . '. k. w/HYDRO HGR,D=3.898" .*.4,..4, 7"CSG,29#,13CR-80 NSCC, --1 9375' y iY.• . , .0371 bpf,D=6.184" 9803' —4-1/2"WFD ER PKR w IRS ANCHOR SEAL PERFORATION SUMMARY SINGER w/0.203"ORFICE(10/14/13) REF LOG: 9887' —FISH:LOSE WFD 4-1/2"ER PKR w/SETTING ANGLE AT TOP PERF:46"@ 9378' TOOL PARTS(10/08/13) Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT Sr-17 4 9900' H4-1/2"WFDCBP(09/03/13) 2-3/4"r 4 9378-9410 C 04/29/96 2-3/4"' 4 9490-9528 C 04/29/96 k %, 10641' --14-1/2'CTC PAY ZONE PKR 2-3/4"' 4 9690-9752 C 04/29/96 2-3/4"F 4 9770-9790 C 04/29/96 • i• 2-3/4"' 4 9850-10086 C 04/29/96 2-3/4"r 4 10110- 10290 C 04!291969-5/8"NES ES CEMENTER — 10641' • X114 2-3/4"F 4 10415-10530 C 04/29/96 i 4....t/ PBTD -1 10683' 4-1/2"LNR, 12.6#,13CR NSCT,.0152 bpf,D=3.958" —1 10692' DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY MT 04/29/96 ORIG HORR COMPLETION 05/11/15 NXW/PJC CRvE Nf PLUG WELL: S-42 02/09/15 PJC CSG/LNR/TBG CORRECTIONS 05/17/15 LAC/PJC JET CUT TBG PERMf No: 1960540 04/02/15 CJWJND GLV GO(03/30/15) 06/17/15 JGR PJC BASE FLANGE(2013)CORRECTION API No: 50-029-22662-00 04/03/15 TFWJNO SARI V NOTE&GLM NOTE EDIT 06/30/15 JNJJND PRE RIG UPCIATES SEC 35,T12N,R12E,4181'FSL&4503'FEL 05/05/15 UK/JIM FB P&A STAGE 1(04/27/15) 05/08/15 JCM PJC TUBING PUNCH BP Exploration(Alaska) TfJ� INIIIIIIIIIIIIIIIIIINMMMMMMNlallMMIIIIM • (4.4,w\����yjs�, THE STATE Alaska Oil and Gas (OF �,,;,-���, of Conservation Commission �; _-_- ALASIc:A Witt_ 333 West Seventh Avenue - GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 p. Main: 907.279 1433 OF ALAS' Fax: 907 276 7542 u c: i5 www.aogcc alaska.gov Ken Allen Engineering Team Leader r „- QS/ BP Exploration(Alaska), Inc. i4' P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU S-42 Sundry Number: 315-133 Dear Mr. Bjork: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, / / i"). .._i_j14,._ Ca y P oerster Chair Q DATED this // day of March, 2015 Encl. STATE OF ALASKA RECEIVED ALAS. OIL AND GAS CONSERVATION COMM ON APPLICATION FOR SUNDRY APPROVAL MAR 1 1 2015 • 20 AAC 25.280 1. Type of Request: AOG CC ❑Abandon • ®Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Change Approved Program ❑Suspend ❑Plug Perforations 0 Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. 0 Exploratory 0 Stratigraphic 196-054 • 3 Address: 6. API Number: e,Alaska 99519-6612 ® Development ❑Service P.O. Box 196612,Anchorage, 50.029-22662-00-00• 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU S-42 . Will planned perforations require a Spacing Exception? ❑Yes No 9. Property Designatior 10.Field/Pool(s): ADL 028257 ' Prudhoe Bay/Prudhoe Bay • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft) Effective Depth TVD(ft): Plugs(measured): Junk(measured) 10692' • 8964' • 10636' 8960' 9900' 9887' Casing Length Size MD ND Burst Collapse Structural Conductor 80' 20" 35'- 115' 35'- 115' 1490 470 Surface 3043' 9-5/8" 34'-3077' 34'-3076' 5750 3090 Intermediate 9342' 7" 33'-9375' 33'-8780' 7240/8160 5410/7020 Production Liner 1478' 4-1/2" 9214'- 10692' 8669'-8964' 8430 7500 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 9378'- 10530' 8784'-8951' 4-1/2", 12.6# 13Cr80 9149' Packers and SSSV Type' 7"x 4-1/2"Baker S-3 Packer Packers and SSSV 9092'/8565' MD(ft)and ND(ft): 12. Attachments' 13.Well Class after proposed work: 0 Description Summary of Proposal 0 BOP Sketch ❑Detailed Operations Program 0 Exploratory 0 Stratigraphic ®Development ❑Service 14. Estimated Date for 15 Well Status after proposed work: Commencing Operation. July 20,2015 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval Date 0 Gas 0 GINJ 0 GSTOR ❑Abandoned Commission Representative: 0 WAG 0 SPLUG ®Suspended • 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: John Rose,564-5271 Printed Name: Ken Allen Title. Engineering Team Leader Email: John.G.Rose@bp.com Signature: --- z:::, �!_________ Phone: 564-4366 Date: 3 ��s Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number: •N S-I"S"?. a'Plug Integrity 8BOP Test 0 Mechanical Integrity Test 0 Location Clearance Other. Sep tcs71- fia 350c p5, (4,7p5Pi's .2 ? p5 ) f}vinulcir- pt-cvcn. ter fcSt to 25 " p5 ' . Spacing Exception Required? 0 Yes dNo Subsequent Form Required: id — 4 U 7- APPROVED BY Approved By: COMMISSIONER THE COMMISSION Date: 3-/5-/-s Form 10-403 Revised 0/2012 net 6 �11Aa- Submit In Duplicate li r v rd for 12 months fr the date of approve g3.. _!S v rz, 3119/15- u RBD M� APR - 2 2015 ,Z iS bp °PC edit i lge 1117 S-42 Sundry Application Well Type: Oil Producer Current Status: SI Request: Approval is requested for the P&A of Prudhoe Bay well S-42 to sidetrack and complete S-42A. MIT-IA Passed to 3000 psi (12/18/11) MIT-OA Pass to 1200 psi (2/14/15) PPPOT-T Passed to 5000 psi (2/16/15) PPPOT-IC Passed to 3500 psi (2/16/15) Well History: S-42 was originally drilled and completed in 1996 as a Zone 4 Ivishak producer. Production logs were run in 8/96 and again in 8/98. Both logs confirmed that almost all production was coming from a fault zone at 9930' md, even though almost 700' were perorated. There were several remediation jobs performed with no apparent production gain. The well is currently shut-in and has seen minimal on-time since 2005 due to subpar rates (99% WC) and has no remaining value or wellwork options. Scope of Work: The pre-rig P&A work for the S-42 well includes pump 2 cement plugs in the well (one to P&A the existing perforations as per the AOGCC requirements and one to provide the DPZ isolation as per our internal practice requirements) and a tubing cut. The rig-work for this well includes a cut and pull of the existing 7" casing at the current 9-5/8" casing shoe prior to a whipstock departure from the 9-5/8" surface casing just above the shoe prior to beginning the S-42A RST. MASP: 2789 psi Estimated Start Date: 7/20/15 Drilling Engineer: John Rose (907) 564-5271 Production Engineer: Alex Youngmun (907) 564-4864 Geologist: Graham Emerson (907) 564-4686 Gtf cm,'" to rodace roc // hq(.e y�"��P� 100 Bo"D vt•,Lo (OC re/ C't. 1 Qss444 f ec�r/1/ cAo �� Ci�(d w c •/ M pr wed recover, t/V A T11;5 (,veli -Four -00-5 aD oi'oa o •i4e foot S-42 Sundry 3/04/15 1 Pre-Rig Work 1. MIT-OA to 3000 psi. 2. Perform a cement P&A of existing production hole perforations by pumping/squeezing a volume of cement(-16 bbls) equal to the 4-1/2" liner/7" casing volume from 9092' MD to 9900' MD. 3. Through tubing punch at-9090' MD and circulate out the IA with seawater. 4. Full-bore DPZ isolation cement plug from 9092' MD to 6583' MD (both side of tubing / -96 bbls cement) leaving seawater and a 2000' diesel cap in well (on both sides of the tubing). 7'C[ TG e. 5. Cut tubing at 4500' MD. 6. CMIT-TxIA to 3500 psi, PPPOT-IC to 3500 psi and PPPOT-T to 5000 psi. 7. Function LDS. 8. Install TWC and test (2000 psi from below/3500 from above). 9. Configure annular valves and install DHT. 10. Remove well house. 11. Rhino line the cellar. 12. Level the pad and prepare location for rig move. Proposed Drilling Rig Operations: 1. MIRU Parker 273. 2. Test TWC from below to 3,500 psi for 30 minutes. 3. Nipple down tree. Nipple up and test BOPE to 3,500 psi. 4. Pull TWC with lubricator. 5. RU hard lines to BOP. Circulate out diesel freeze protection through choke to tiger tank with clean 8.5 ppg seawater. 6. RU and pull the 4-1/2" tubing from the pre-rig jet cut at -4500' MD. 7. RU E-Line USIT to confirm cut point for the 7" casing. 8. If USIT confirms, cut 7" casing at the existing 9-5/8" casing shoe (mechanical cut on DP at current WBS TD depth at-3077' MD) and circulate out the freeze protect fluids from the OA. 9. RU and pull 7" from cut. 10. RIH with 9-5/8" clean out assembly to just below the casing shoe at 3077' MD. 11. RU E-line w/GR/CCL log and set EZSV at-5' above the casing shoe at-3072' MD and pressure test to -3000 psi for 30 min (chart test). 12. PU 9-5/8"whipstock, bottom trip anchor and 8.5" window milling assembly (to include full gauge string mills) and RIH to the top of the EZSV and orient and set the whipstock. 13. Swap the well over to 9.0 ppg fresh water LSND milling fluid. 14. Mill window in the 9-5/8" casing plus 20' of new formation. S-42 Sundry 3/04/15 2 TREE= 4'CAN SAFETY NOTES:SSSVN ST./6,05,&94 COULD 1ABLFEAD= FTC ACTUATOR. BAKER S-42 BE SER BY APPROX.80'-MU NE TBG AND 70' 9536' pa3.MeV= 71 7f1 UV,70' BF B.EV= 3/1' - KW. 3787' Lege Angie_ 879101 O 2170' ( I2 HES MO SSSVN,o=3.8)3' Datum MD= 9549' Datum IVO= 8800 SS 19-SIB'008.40$11).L-80,BUTTRESS H 3077' 1--411 111, GAS LFF33.T MAN] S ST RD TVD DEV TYPE VLV LATCH IPORF DATE I. 6 3476 3474 6 10113-2-LS 001.4E NT 16 08123/12 5 5635 5254 43 KBG-2-LS DOW NT 18 08123112 4 8770 6253 8 KED-2-LS SO NT 24 0812612 3 7513 6994 1 KBG-2-IS Okla NT 0 05116)07 2 8264 7745 0 KBG-2-LS DRY INT 0 12118111 [r TOG,291/FT BLW,281/FT ABV,L-80,1400 BUTT —1 8407' , / 1 9014 8492 20 KBG-2-LS (TRY NT 0 07/19/98 NOTE PROBLEM MAII1RR S;l&01MESPE IAL VALVES I I 0081' --j 4-I Q'1ES x-AP,D=3.51 r I Minimum 10=0203"@ 9803' RS ANCHOR SEAL STINGER x I 9082' Hr x 4-1/2'SKR S-3 RCR D=3.875' 1 I I I 8115' H4-171'If9XNP,D=3.813.1 I 11 913r H4.10'1433XNNP,D=3.7251 4-12'TBG,12.8/,CR-$SCT. H 9149' ----7 ' 01494-1/2 V4LEG .0152 bpf,0=3.958' 1 916r H MAO TT LOGGW0811 V96 I —{.. 9218' 1—f 4-1/Y TV/TIEBACK SLY,D=5.277.1 o. [ 9224' 2'X4-112'TWW7SET MAW HYDRO FGR 1 9803' —4-1/ "WOEtPKRw/FSANCHORSEAL VSt10E 29$/FT.000 BUTT l37B' SINGER w/0.203'Of»(10/14/13) 988T —FER LOBE two 4-1/2'B2 1002 w/SETTNG F ERFORATION SLRRNRY TOOL PARIS(1010013) FIEF LOG. A/CLEATTC*'f :46'§9378' 4� 9900' 4-1R'WFDCFBP(09103/I3), Pb :NRefer to Roducion(B for historical pert data ;� I 10641' 14-1/2'CTC PAYZOPEROI I SUE SPF NIFRVAI C xUSgz SHOT 1 ST37 2-3/4' 4 9378-9410 0 04/27/98 i 14 10638' MID 2-3/4' 4 9490-9528 0 0427/98 �� 2-3/4' 4 9690-9752 0 04/27/96 j 2-3/4' 4 9770-9790 0 0427/98 1 �� j I 2.3/4' 4 9850-10086 CYC 04/17/96 1 �� `•4,41/1 2-3/4" 4 10110-10290 C 04/27/96 44., 2-3/4' 4 10415-10530 C 04727/96 14-12'LNIZ 12.80,CA-NCST,.0152 bpf,D 3.958' --I 10692' I DATE REV BY _ OONACNTS DATE FTN BY OOWENTS Fi3FOHDEBAY IN(T 84)29!98 OF8G PORTZ CONPLETTOI\08/27/12 FERRO GLV C/O(0825112) WEIL:S-42 08/71X16 C.HR IG GLV(/O(08118106) 09/12/13 FBS/.1.0 SET CUP&FISH DM(09/03-04/13) mom-No:'1960540 01/0207 RCT/TLH 11108(31V POlE ' 11/01/13 ALM'3w0E21404 ASANCHOR/SEAL SINGER AN No:50-02122662-00 0522/07 OAV/T(-H GLV C70(05/16/07) SEC 35.T12N.R12E 4181'FSL d 4503'FR 0320/10 J 4SV CSG COFFECTON 12/27111 .FL..YY,AO CLV CIO(12/18/11) BP BcpIora4on(Alaska) S-42 Sundry 3/04/15 3 VLPEAD- 4- � RAC MD/TVDss S-42A Pro-Rig SAFETY NOTES:USW ST.AB,05,&14(X)ULD ACTWTOR —�BAKB: TNA 5182'/-4882' BEOffPBtBYAPPROX.a0'-CI1 )ME1BGMD 0103 aBf= 71.79 TCdville 5780"/-5292' (lw/2/6/15) tilt 70'9 9539' 8F 13.Ev= 311' TKUP 72387-6648' KOP= 3787' TMLV 7351'/-6771' 2170* HAM' D=3.813• Mu Angle= 87e io139' TSGR 9363'/-8701' oQ itumll= 9549' Opium = 8890 /4-1/2"Tubing Cut at-4500'MD ' y GAS LIT w°rargs I9-518'C[3S.40NFT.L-00.8UT1RFSS H 3077' 1---41/1 ST (1,O TVD DEV TYPE viv LATCH tt7RT CAlE 4 ^' 6 3476 3474 6 1®[12-LS OOkE NT 16 08/25/12 Estimate 7"TOC 3077'-6518'MD 5 5635 5254 43 103G-2-LS MAE NT 16 01125/12 (depending on wash-out&losses during job)/• • • 4 6770 6253 8 KB 2-LS SO NI- 24 08/25/12 DPZ isolation plug TOC-6583'MD' ' ji. : 3 7513 6994 1 KBG-2-LS CW Nr o 05/16107 (650'TVD above TKUP) ,•'' p . 2 8264 7745 0 tWG-2-LS OMI NT 0 12/16/11 it TBG.290/FT BLW,260IfT ABV,1-80,MOO Bun H 9407" , ' • 1 9014 8492 20 103G-2-LS OMI M 0 07/19/94 ‘40•0 , 1►'- *I NOTE PROBLEM MANDRELS;REQUIRE SPECIAL VALVES • •' 1 "" • •" • { !1081' 044-i/2'FES X-ISP,0.3.613'3 Minimum N)=0-203" 9803' • ! . RS ANCHOR SEAL STINGER - . • - . 4 ,; ,•;. ' 4-1/2"Tubing Punch at-9090'MD 9092' r x 4-1R'BIO 5-3 ROL 0=3.875'I Top P&A/Base DPZ isolation cmt plug-9092'MD * j 0 1)-1 inir 1--14-1/7 HESX NP,D=3.813' I 4 i•4' 1 I 9137 H.-1/2'HES XNNP,0=3.125'I 4-1/2'18G 12.64,CR-MSCT, 91 "0 ' L015z evf,D 3.956• � 49' 1♦ • *°� I !14!' 1-14-1/2-AUG • .•+.` • •. I 9162' 1 aw TT LOGGED 08111188 I 4w. ' 1 DPZ isolation cmt plug f/9092'to 6583'MD(96 bbls cmt) '4. „*a'• *'4 TIEP&A cmt plug(19900'to 9092'MD(16 bbls cmt) • •^ .• [ 112111* Hr X 4-1/2''RN3LV:D=5.27r I a4 • 922X' I'--1r X 4-12'TNVwT SET SET PKR va F11 ORO Hoa I • 44I 99(13' —4-1/2'AM1321102w/RS ANCHOR SEAL Ir ewe,2981F1,MOD Burr _L 9376' I--• •• STNGER w/O 203'ORFICE(10/14/13) 988T FSI!LOSE VVFD 4-1/2'6t ROI w/SETING PERFORATION SIJ S Rl' • TOOL PARTS(10/06/13) FNB LOG - ANGLEATTOPF6E.46'Q9378' 4; I 1000 I-I4-1/2 NSDCMP(09/03(13)I Nota:Refer to Roduct on OB for hsbncal pert data4- I 10941' H4-12'CTC PAYZONE PKR I SFZE SFr NTERVAL Opn/Sgz SHOT SOZ ' �r ' 2-314' 4 0378-9410 0 0412'7/98 - T 106/6' P610 2-314' 4 9490-9528 O 0427196 j/ :i 2-304' 4 9690-9752 O 0427196 1 2-3/4' 4 9770-9790 O 0427/96 �� 2-304' 4 9850-10086 O/C 04/27/96 �� �/��r 2-304' 4 10110-10290 C 0427/96 �./��I 2-3/4' 4 10415-10530 C 04/27196 Base P&A cmt plug-9900'MD 4-1/1 LIR,12-114,CR-NCST,.0152 Opt,D=3.956' -{ 19692 I DATE FEV 8Y OON FIS DTE REV BY COW:NM FRUC OE BAY UN! 04229191 OM HOPE COMPLETION 0827(12"I407.111113 GLV(20(08/25112) WELL:S-42 0621/06 C,INFMIG GLV(20(06116A6) 09/12/13'FBSIA0 SET COP&RSH 0H(09/03-04113) F23a1TNo:'1960540 01/02107 ROMA ROB GLV NOTE 11/01/13'ALM,MA)ER RCRIN IRS ANCHOR/SEAL STINGER AR Pb:50-029-22662-00 i 05/22/07 DAV/Tat GLV 00(0518107) SEC 35,71214,R12E,4181'FSL E 4503 FS 03/20110 .LWSV CSG CORRECTOR 1227/11 .S..Y,M)) GLV 00(12/18111) BPRploration(Alaska) S-42 Sundry 3/04/15 4 by 0 Parker 273 BOPE Schematic PARKER 273 BOP STACK RAM TYPE BCP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-SM I 11 j 13 5/8"-5M STUDDED TOP }e 13 5/8"-5M FLANGE) BOTTOM '9ANNULAR BOP: W/(2) 14" JL2 OPERATOR. UPPER CAVITY \' AND (2) 14" PSLK W/BSTR OPERATOR, "^�� LELIT^" SHAFFERHALXT 13 5N-5V 13-5/8" 514 STUDDED TOP LOWER CAVITY o 13-5/8" 5M FLANGE) BOTTOM 0 ' 1 1 DRILLING CROSS: 13 5/8"-5M FLANGED TOP I ■� • " .. _i_.-E . 13 5/8'-51A FLANGED BOTTOM ,°",.Q «C W(2) 3 I/8"-5M SIDE OUTLETS X U • 1='- S' B C 31 KILL LIVE �?SX?4 -1 'C—Q4- 7. 2-1/16" 5M FLEX HOSE ��.y�.�� �Q �ti S.d �� 2-1/16" SM X 3-1f8" SM D.S.A. �.'-' 1 ! r te`` 3-1/8" 5M FLANGED MANJAL;ATE VALVE U 3-1/8" M FLANGEO NYDRAULIC GATE VALVE C "lialown + �� -, 31 I _T.. _ I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL CATE VALVE 13 5/8R LAT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-SM STUDDED TOP 3-1 8" 5M FLEX HOSE 13 5/8 5M FLANGED BOTTOM / W/(2, 14" JL2 OPERATOR S-42A Sundry Page 1 3/11/2015 Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" / boxes are also checked, cross out that erroneous entry and initial it on both ,/ copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work) the initial reviewer will cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then V/ check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. i~'(4 --0.5' c~ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS' Scanned by: Bevefly~incent Nathan Lowell Date: [] TO RE-SCAN Notes: Re-Scanned by: Beverly Dianna Vincent Nathan Lowell Date: /si • STATE OF ALASKA AL .<:A OIL AND GAS CONSERVATION COMM. .ON)re,. i i t.' REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon Li Repair Well u Plug Perforations U Perforate Lf Other U Packer Set Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ 5c1- G 15 P Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development Exploratory ❑ 196-054-0 3.Address: P.O.Box 196612 Stratigraphic Service ❑ 6.API Number: Anchorage,AK 99519-6612 " 50-029-22662-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: . ADL0028257 V PBU S-42 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured . 10692 feet Plugs measured 9900 feet true vertical 8964.26 feet Junk measured 9887 feet Effective Depth measured A 9900 feet Packer measured See Attachment feet true vertical • 8907.81 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91.5#H-40 30-110 30-110 1490 470 Surface 3043 9-5/8"40#L-80 34-3077 34-3075.99 5750 3090 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner 1478 4-1/2"12.6#13Cr80 9214-10692 8668.54-8964.26 8430 7500 Perforation depth Measured depth 9378-9410 feet 9490-9528 feet 9690-9752 feet 9770-9790 feet 9850-9900 feet 9900-10086 feet 10110-10290 feet 10415-10530 feet True Vertical depth 8784.44-8805.69 feet 8849.86-8865.68 feet 8887.49-8893.1 feet 8894.85-8896.8 feet 8902.91-8907.81 feet 8907.81-8920.58 feet 8921.91-8933.01 feet 8942.78-8951.46 feet ' Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#CR-NSCT 29-9149 29-8614.96 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SC pHNE0 '�N 1 I2.01 RBDM MAY 16 2014 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 41 1058 4744 1766 266 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development❑✓ . Service❑ Stratigraphic ❑ DailyReport of Well Operations X 16.Well Status after work: Oil . Gas WDSP P P � u Lu GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerha s• b•.com Printed Name Nita Summerhays Title Data Coordinator �r � Signe t,/ InWiAs- Phone 564-4035 Date 1/15/2014 VLA 5/z27/� /*f-/r-//7 Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028257 AG nn Y'A I ' ' � , . - . of Job Objective: Set CIBP and ER packer w/orifice MIRU CTU. MU WFD MHA& PDS logging tools, 2.2" PDS carrier, 15.79' OAL w/3.69"drift Noz. PT& RIH. Log from 10,000' up to 9000', painted flag @ 9750', POOH. 9/2/2013 ....Job in Progress... CTU #6- 1.75" Coil Job Objective: Set CIBP and ER packer w/orifice Cont POOH w/PDS logging string. Good data, +20' correction. MU WFD 4 1/2" DB10 CIBP & setting tools, PT & RIH. RIH to flag and corrected to 9771.8', centr of element. Set plug at center element 9900' corrected depth. POOH. Trim pipe for chrome management. Connector failed pull test, and try to determine pipe crush from external connectors. Make up Internal connector and ER packer MHA. PT MHA, good, MU WFD 4 1/2" ER pkr& setting tools. PT & RIH. Pkr at 9810' corrected depth, launch ball, pumping ball to set pkr. 9/3/2013 «JOB IN PROGRESS»> CT-6 1 3/4" Scope of Work: Cont pumping setting ball down, ball on seat& sheared out @ 4800 psi. Pkr not set, not taking wgt down or any OP picking up. POOH. ER pkr gone from setting tool assembly. Ball recovered, took tools to town to inspect. Prep for fishing ER pkr. Discuss with town, will return to well after rig move. FP well with 39 bbls of 50/50 meth. RDMO NOTE:ER Pkr Fish in hole, 9810' to top of CIBP @ 9900'. Lower 1/2 of setting tool adaptor, ( -6"x 2.375' OD) & 3"x 1.61"OD mandrel is on top of 4 1/2" ER Pkr. Setting adaptor is probably loose, mandrel MU to Pkr. FN on pkr is WFD 4 1/2" ER pulling tool. Drawing will be in well file Thurs 9-5-13. ******Do Not Flow Well****Mobile Fish in hole****** 9/4/2013 «<JOB INCOMPLETE»» CTU #3 w/ 1.75" CT (CTV=27.7) Objective-fish ER packer fish, set new ER packer CTU standing by in SWS yard. 10/5/2013 Job continued on 10/6/13 WSR. CTU #3 w/ 1.75" CT(CTV=27.7) Objective-fish ER packer fish, set new ER packer MIRU from SWS yard after BOP swap. Perform BOP Test. 10/6/2013 Job continued on 10/7/13 WSR. CTU #3 w/ 1.75" CT (CTV=27.7) Objective-fish ER packer fish, set new ER packer Complete BOP test. Barrier test passed, but had to install second swab after tree swab would not hold positive pressure from above for PCE pressure test. 10/7/2013 ***Job Continued on 10/8/13 WSR*** Daily Report of Well Operations ADL0028257 CTU#3 w/ 1.75" CT (CTV=27.7) Objective-fish ER packer fish, set new ER packer RIH w/WFT fishing BHA and set down at TOL at 9211' CTM. Unable to pass. POH. RIH w/3.5" nozzle assy and tag top of ER Packer/fish at 9887' CTM. Discuss. POH. Cut 125' of CT for chrome management. RIH w/ PDS MGR/CCL. Re-tag fish at same depth. Log out of hole at 40 fpm from 9887' -9760'. Flag coil at 9760'. Continue logging out of hole up to 9000'. POOH. 10/8/2013 ***Job Continued on 10/9/13 WSR*** CTU#3 w/ 1.75" CT(CTV=27.4) Objective-fish ER packer fish, set new ER packer POOH w/ PDS MGR/CCL. Good Data. +6' correction to tie-in log: PDS Jewelry Log dated Aug 11, 1996. RIH w/WFT 4-1/2" ER packer w/ ported bullnose and set w/top at 9810'. POH. RIH w/WFT orfice assy w/anchor seal stinger and could not pass the TOL at 9215' CTM. POH. RDMO to SWS yard for planned maintenance while WFT fabricates a tapered flow-thru nose for the stinger 10/9/2013 Job incomplete CTU#3 1.75" Coil (CV=27.4) Job Objective: fish ER packer fish, set new ER packer MIRU. Rih w/WFR CTC, DFCV, Hyd Disconnect(7/8" ball) G-spear&4-1/2 G fishing Neck w/ .203 orifice, 5' x 2.875" spacer(OAL= 7.48', 8400#shear), RS anchor Seal Stinger w/ modified bull nose. 10/13/2013 ***Job continued on 10-14-13 WSR*** CTU#3 1.75" Coil (CV=27.4) Job Objective: Set BH choke Continued from 10/13/13 WSR. Continue in hole with 4-1/2" G Fishing neck w/ .203"choke, 5' x 2.875" spacer, RS Anchor Seal Stinger to 9799' ctm. Sting into ER packer. Stack 10K. Pull 5K over to verify snap latch engaged. Pump off. Pooh while pumping 38 bbls 60/40 Freeze Protect down Coil Backside. RDMO 10/14/2013 ***Job Complete*** FLUIDS PUMPED BBLS 751 1% KCL WITH SAFE LUBE 137 50/50 METH 50 60/40 METH 76 METH 1014 TOTAL N a 0 0 000 CVM c° � 9 'too O LO r.-- CO U y o 0 0 0 0 1- O M V CO LO • NI" NI- m Cb I-- (70 LO CO V CO N LO N- CA (fl N O (O O (0 M O) O) - V CA 0 00 M O LO - O LO (70 O (70 m f-- 0) L) LO (0 00 N- O (0 m (70 m Cb c0 M (70 H co N 6) L.0 LO N LO O O CO NiLO V M 06 O) M co Ln CO o M CO M N (01010 (0 a0 (0 (0 (0 (04-0 f� - CD N ' 0) 0) 0) (00) C) 0) o ID 2 Q N t '- 10N- N- CO O = 00 ' C') C') o O M N O M y C) N C c 0) 0) 0) 0) (b XI J � a0 U U) a) a� QQQo0 0oo Z @j ZZJ % O N _ Z # co *- • f/) N - - (I:3 N - CO ;i O N N N _ ON r LO N „ "• CD CV 4 4 L +-' 00 •:1' co M o0v. C0 Lo m m M O O d ( O M O -J Z Z O O 01 Hw D w w w D.000 _ < O O J J J O O LL Z ✓ Z w a a w O O m OZa_ a_ a- CCIXDD UJZZZa. QU) H Packers and SSV's Attachment ADL0028257 SW Name Type MD TVD Depscription S-42 PACKER 9092 8492.72 4-1/2" Baker S-3 Perm Packer S-42 PACKER 9224 8604.59 4-1/2" TIW WT SET Packer W/ HY S-42 PACKER 9803 8826.29 4-1/2"WFD ER Packer W/RS ANC S-42 PACKER 10641 8888.54 4-1/2" CTC PAY ZONE Packer • 'TREE= 4"OW SI f NOTES: SSSVN ST.#6,#5,&#4 COULD 1 WELLFEAD= FMC S-42 BE DEEPER BYAPPROX.80'-CHROME TBG AND ACTUATOR= BAKER LNR,70°@ 9536' OKB.ELEV= 71.79' BF.ELEV= 37.1' KOP= 3787' 2170' —14-1/2"FES HXO SSSVN,0=3.813" Max Angle= 87 a' 10139' Q Datum MD= 9549' Datum TVD= 8800'SS 9-5/8"CGS,40#/FT,L-80,BUTTRESS H 3077' 1 GAS LFT MANDRELS ST MD TVD DEV TY FE VLV LATCH FORT [GATE • 6 3476 3474 6 KBG-2-LS DOME NT 16 08/25/12 5 5635 5254 43 KBG-2-LS DOME NT 16 08/25/12 4 6770 6253 8 KBG-2-LS SO NT 24 08/25/12 3 7513 6994 1 KBG-2-LS DMY NT 0 05/16/07 2 8264 7745 0 KBG-2-LS DMY NT 0 12/18/11 7"TBG,29#/FT BLW,26#/FT ABV,L-80,MOD BUTT H $407' A I 1 9014 8492 20 KBG-2-LS DMY NT 0 07/19/98 NOTE: PROBLEM MA S;REQUIRE SPECIAL VALVES I I 9081' H4-1/2"FIES X-NP,D=3.813" Minimum ID =0.203" @ 9803' RS ANCHOR SEAL STINGER Z R 9092' H7"X 4-1/2"BKR S-3 PKR,D=3.875" I I I 9115' —4-1/2"FES XNP,D=3.813" 913T 14-1/2"FES XN NP,D=3.725" 4-1/2"TBG,12.6#,CR-NSCT, —I 9149' / \ 9149' —14-1/2'WLEG .0152 bpf,0=3.958" 9152' H HMD TT LOGGED 08/11/96 JJ--1 9218' --17"X 4-1/2"TNVT1EBACK SLV,D=5.277' 9224' H X 4-1/2"TMV WT SET PKRWI HYDRO HGR — 9803' —4-1/2"VVFD B PKR w/RS ANCHOR SEAL r SHOE,29#/FT,MOD BUTT 9375'_ _ , SINGER w/0.203"ORFICE(10/14t13) 9887' 1 FISH:LOSE WED 4-1/2"BR PKR w/SETTING,/ PERFORATION SUMAARY TOOL PARTS(10/08/13) REF LOG: ANGLE AT TOP PERE:46"@ 9378' 4116 A; 9900` --I4-1/2"VVFD CBP(09/03/13) , Rite:Refer to Production DB for historical pert data ,� 10641' --H4-1/2"CTC PAYZONE PKR SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-3/4" 4 9378-9410 0 04/27/96 ' // jy,, 10636' —{PBTD 2-3/4" 4 9490-9528 0 04/27/96 /I "�� 2-3/4" 4 9690-9752 0 04/27/96 2-3/4" 4 9770-9790 0 04/27/96 A� Q�.:D 2-3/4" 4 9850-10086 O/C 04/27/96 'if ,1k.k... 2-3/4" 4 10110-10290 C 04/27/96 Ate 2-3/4" 4 10415-10530 C 04/27/96 4-1/2"LNR,12.6#,CR NCST,.0152 bpf,D=1958" H 10692' DATE REV BY COMVENTS DATE REV BY COMMENTS PRIDHOE BAY UNIT 04/29/96 ORIG HOR1Z COMPLET1Ot 08/27/12 RKT/JND GLV C/O(08/25/12) WELL: S-42 08/21/06 CJWPAG GLV CIO(08/18/06) 09/12/13 FBS/JMD SET CBP&FISH DH(09/03-04/13) PERMT No:'1960540 01/02/07 RCT/TLH PROB GLV NOTE 11/01/13 ALMJM) ER PKRw/RS ANCI-IORISEAL SINGER API No: 50-029-22662-00 05/22/07 DAV/TLH GLV C/O(05/16/07) SEC 35,T12N,R12E,4181'FSL&4503'FE. 03/20/10 JLW/SV CSG CORRECTION 12/27/11 JLJ/JMD GLV C/O(12/18/11) BP Exploration(Alaska) P61/1 5- m I% -o54- Re James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIIntegrityCoordinator @bp.com] (- 2 ( 1 7�� ( 4ei / I( Sent: Wednesday, December 21, 2011 3:57 PM r To: Regg, James B (DOA) Subject: RE: Producer S -42 (PTD #1960540) Tubing Integrity Confirmed Attachments: S -42 (PTD 1960540) Problem Well Classification.ZIP; S -42 (PTD 1960540) TIO Plot.doc Hi Jim, This well was reclassified as a problem well May 18, 2007 after found having sustained casing pressure on the IA. This well has since been shut in. I've attached a copy of a scanned email taken from the state's well electronic files sent May 18th reclassifying S -42 as a problem well. There have been no sustained casing pressure events for this well in the last four years since the May 18th 2007 reclassification. I have also attached a four year TIO plot. As per the attached re- classification email, this well was found to have sustained casing pressure on 05/01/07 and subsequently failed a TIFL on 05/10/07. The valves in this well were dummied but, when an MIT -IA failed on 05/24/07 the well was secured with a TTP. An LDL found a gas lift valve to be leaking on 08/02/07 but no subsequent wellwork commenced until recently. On 12/19/11, after changing out a gas lift valve, a passing MIT -IA was obtained. Jerry's email references the passing MIT -IA just obtained. Please let me know if you have any further questions. Thank you, Whitney King (Alt. Greg Walker) Alaska Drilling and Wells Well Integrity Engineer W: 907.659.5525 ; C: 310.989.7674 whitney.kingl (c�bp.com From: Regg, James B (DOA) [mailto:jim.regg @alaska.gov_] Sent: Wednesday, December 21, 2011 10:55 AM To: AK, D &C Well Integrity Coordinator Subject: RE: Producer S -42 (PTD #1960540) Tubing Integrity Confirmed Was there a problem with this well requiring a notice of SCP? I don't find notice if there was. Jim Regg AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907 - 7934236 From: AK, D &C Well Integrity Coordinator [mailto: AKDCWeIIIntegrityCoordinator @bp.com] Sent: Tuesday, December 20, 2011 6:18 AM To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad SW Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); LeBaron, Michael 3; King, Whitney Subject: Producer S -42 (PTD #1960540) Tubing Integrity Confirmed All, 1 Producer S -42 (PTD #1960540) passed an MIT -IA to 3000 psi after reinstalling a dummy gas lift valve in Station #2 on 12/18/2011. The passing test confirms the presence of two competent barriers in the wellbore. The well is reclassified as Operable. Please call if you have any questions. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 2 PBU S -42 PTD #1960540 12/21/2011 4 year TIO Pressure Plot We 0-42 4,000 • • 3000 -i- TbpL f IA _a- OA 2.000 00A • +- 000A On f 1,000 � — m �� a 0111. � .1I 03/12/07 06/13/07 09/14/07 12/16/07 03/18/08 06/19/00 09/20/08 12/22/08 03/25/09 06/26/09 09/27/09 12/29/09 04/01/10 07/03/10 10/04/10 01/05/11 04/08/11 07/10/11 10/11/11 • • . BP Exploration (Alaska) Inc. Attn: Weil Integriry Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 June 25, 2009 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of S-Pad Dear Mr. Maunder, • bp ~ ~~ JUL 0 1 2009 ~l~~ka Oi! ~: Gas ~~nso Cornmissi~~ ~~chara~~ ~ ~~-o~ S " ~' ~. Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my_al.teKna#e, Anna Dube, at 659-5102. Sincerely, "~ ~DC~ ~"~~~~~ `~ ,~lil.. ~k z: ~~~ Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annutus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Oparations (10-404) S-pad ~'1 omR 6/25/2009 Well Name PTD A Initial top ot cement Vol. ot cement um ed Final top of cement Cement top off date Cortosian inhibitor Corrosion inhibitod sealant date ft bbls ft na al S-Ot8 1952020 0.25 NA 025 NA 2.6 5/30/2009 S-02A 1941090 025 NA 025 NA 17 5@5/2009 S-03 1811900 1325 NA 1325 NA 92.65 5/20/2009 S-o4 1830790 0 NA 0 NA 0.9 5/25/2009 S-OSA 1951890 0 NA 0 NA 0.9 5/26/2009 S-06 1821650 0 NA 0 NA 0.9 5/26/2009 S-07A 1920980 0 NA 0 NA 0.9 5/26/2009 S-OaB 2010520 0 NA 0 NA 0.85 5/27/2009 5-09 1821040 1.5 NA 1.5 NA 9.4 5/31/2009 S-tOn 1911230 0.5 NA 0.5 NA 3.a 5/31/2009 S-118 1990530 025 NA 025 NA 1.7 5/27/2009 S-12A 1851930 025 NA 025 NA 7.7 6/1/2009 5-13 1821350 8 NA 8 NA 55.3 6/1/2009 S-15 1840170 0.25 NA 025 NA 3 6f2/2009 S-17C 2020070 025 NA 025 NA 2.6 6/7/2009 S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009 S-19 1861160 0.75 NA 0.75 NA 2.2 5/19/2009 S-20A 2010450 025 NA 025 NA 1.3 5/79I2009 5-21 1900470 0.5 NA 0.5 NA 3.4 5/25/2009 5-228 1970510 075 NA 075 NA 3 5/19/2009 S-23 1901270 025 NA 025 NA 1.7 5/25/2009 5-248 2031630 0.5 NA 0.5 NA 2.6 5/25/2009 S-25A 1982140 0.5 NA 0.5 NA 2.6 5/25/2009 S-26 1900580 0.75 NA 0.75 NA 3.4 5/2&/2009 5-278 2031680 0.5 NA 0.5 NA 2.6 5/31/2009 S-2se 2030020 0.5 NA 0.5 NA 2.s 5/31/2009 S-29AL7 1960120 0 NA 0 NA 0.85 5/27/2009 S-30 1900660 0.5 NA 0.5 NA 5.1 5/31/2009 S31A 1982200 0.5 NA 0.5 NA 3.4 5/26/2009 S32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009 5-33 1921020 0.5 NA 0.5 NA 4.3 5/26/2009 S3a 1921360 0.5 NA 0.5 NA 3.a 5/31/2009 S35 1921480 0 NA 0 NA .BSin 5/31/2009 S36 1921160 0.75 NA 0.75 NA a.25 5/27l2009 S37 1920990 125 NA 125 NA 11.9 5/27/2009 5-38 1921270 025 NA 025 NA 102 5/27/2009 S-41 1960240 1.5 NA 1.5 NA it.~ 5/30/2009 5-42 1960540 0 NA 0 NA 0.9 5/30/2009 5-43 1970530 0.5 NA 0.5 NA 1.7 5/28/2009 5-44 1970070 025 NA 025 NA 1.7 5/28/2009 5-100 2000780 2 NA 2 NA 21.3 5/29/2009 5-101 2001150 1.25 NA 125 NA 11.9 5/29/2009 S-102L7 2031560 125 NA 125 NA 7~.7 5/37/2009 S-103 2001680 1.5 NA 7.5 NA 11.9 5/18/2009 S-10a 2001960 1.75 NA 1.75 NA t5.3 5/20/2009 5-105 2001520 4 NA 4 NA 32.7 5/20/2009 5-106 2010120 1625 NA 7625 NA 174.3 6/2/2009 S-7a7 2071130 225 NA 225 NA 28.9 5/18/2009 S-i08 2017000 3.5 NA 3.5 NA 40 5/30/2009 5-109 2022450 2 NA 2 NA 21.3 5/30/2009 St70 2011290 11.75 NA 11.75 NA 98.6 5/30/2009 S-iit 20505t0 2 NA 2 NA 19,6 5/30/2009 S-7i2 2021350 0 NA 0 NA 0.5 5/30/2009 5-113 2021430 1.75 NA 1.75 NA 22.1 5/18/2009 5-114A 2021980 125 NA 125 NA 102 5/30/2009 S-775 2022300 2.5 NA 2.5 NA 272 5/29/2009 S-116 2031810 1.5 NA 1.5 NA 73.6 5/28/2009 5-117 2030120 1.5 NA 1.5 NA 15.3 5/29/2009 5-118 2032000 5 NA 5 NA 76.5 5/28/2009 S-~ 19 2041620 1 NA 1 NA 5.2 5/30/2009 S-120 2031980 5.5 NA 5.5 NA 672 5/29/2009 S-72t 2060410 4.5 NA 4.5 NA 53.8 5/28/2009 S-722 2050810 3 NA 3 NA 21.3 5/29/2009 5-123 2041370 1.5 NA 1.5 NA 20.4 5/26/2009 5-124 2061360 1.75 NA 1.75 NA 11.9 5/26/2009 S-125 2070830 2.25 NA 225 NA 20.4 5/28/2009 5126 20710970 125 NA 125 NA 15.3 6/1/2009 5-200 1972390 1.25 NA ~ 125 NA 14.5 5/28/2009 5-201 2001840 0 NA 0 NA 0.85 6/19/2009 S-213A 2042130 2 NA 2 NA 13.6 5/29/2009 S-215 2021540 2 NA 2 NA 18.7 6/1/2~9 S-216 2001970 4.75 NA 4.75 NA 51 5/29/2009 5-217 2070950 0.25 NA 025 NA 1.7 6/1/2009 5-400 2070740 2 NA 2 NA 9.4 5/28/2009 5-401 2060780 16 NA 16 NA 99.5 6/2/2009 S-5oa 0 NA 0 NA 0.85 5/28/2009 ~ . . 08/30/07 Scblumberger NO, 4396 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 . L A TTN: Beth ~ \dÝ" v'~e0' ¡..' SCANNED SEP 18 2007 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay End'c tt ~ 10 Job# Loa Description Date BL Color CD \. MPC-08 / N/A RSTIWFL 08/10/07 1 ,.....,...-, " 11767136 MEM INJ PROFILE l J:r: (!. I <- !'i - J/)"";f 08/12/07 1 P2-16 11856185 INJECTION PROFILE I J-rf\ Ie. - l.:l~ 08/02/07 1 07-02A 11649983 MEM PROD PROFILE ¡q(. - N1 'í< 08/07/07 1 R-13 11856186 INJECTION PROFILE I IT" I~ ~ - rl-/q 08/02/07 1 D-11A 11649982 MEM PROD PROFILE ''1~ - "1(~ 07/26/07 1 S-42 11686773 LDL I q &. - r...."'r"<./ 08/02/07 1 S-43 11855804 LDL J C-ì ~ -C£:::" 08/02/07 1 16-07 11855806 STATIC PRESSURE SURVEY 11(5""-.904 08/04/07 1 16-21 11855805 STATIC PRESSURE SURVEY /1)f\ -;~I ~ 08/04/07 1 1-09A1L-21 11849930 SBHP SURVEY , ~ '9- - l'>:Jq 08/04/07 1 2-68/S-17 11630491 LDL ¡1Ó(- ()O,':.}- . 07/27/07 1 1-23/0-15 11846802 STATIC PRESSURE SURVEY U:r:C'_ lq¿¡ -/{:) "'i( 08/11/07 1 Z-46 11057080 CH EDIT PDC GR (USIT)dt':6"-J;¢\f 'It 1~<'¡;J::J 12/14/05 1 A·09A 11216203 MCNL .at"\D-I-:}l.{" '5'{/~'-1 06/29/06 1 1 L3-11 11801065 RST I "Zrt) - ;::)~ ¡ .... ¡Jt::r<,/;>":? 05/31/07 1 1 PLEASE ACKNOWLEDGE RECEIPT~ ,ª!$?t:m'IG, AND RETURNING ONE COpy EACH TO: . ~"tl7'~-'" !('·-'~.\fu""7"'tI~~ ,f'{?W"" BP Explorallon (Alaska) Inc. ¡ii"",'. f.f''''''' fr., .' 'f'-" 'i ~ Þ ~~'"' ,,~\\ ¡1 -'.\ P U ,,\-\ j!,' N Petrotechnical Data Center LR2-1 ,'"-" .." ",""'" fi" f,'_- 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 __.AK "50'~ ATTN: Beth t /-- Received by ¡. 4 2007 Date Delivered: i \'¡, '. '.1, ;'; ')iI ,I! (;'1',' ( .. '\1''., S-42 (PTD #1960540) Classified as Problem Well . All, Well S-42 (PTD #1960540) has been found to have sustained casing pressure on the IA. The TIO pressures were 220/2060/240 psi on 05/01/07. A subsequent TIFL failed on 05/10/07. Thank you - 5CANNED MAY 1 8 Z007 PN~ C~1 .J.A -:; W~r¡ J.AJÁ{ f '=7 2Jj() fSI ~ .A,Ai)<.eß'Sk\'Y. J- /()we~'¡' Ã-'lP'YP 7" Zq.JS. L'6ð / U'" L ~ The plan forward for this well is as follows: 1. D: TIFL - FAILED 2. S: Set DGLVs 3. D: TIFL J % }Wi? : ò~ ~ (\:.') 4q Z- L.4 s-<-~ f-.!Sy f A wellbore schematic has been included for reference. «S-42.pdf» The well has been classified as a Problem well. Please call if you have any questions. Jack L. Winslow (for Andrea Well Integrity Engineer office - 659-5102 pager - 659- 5100, 1154 Hughes) . Content-Description: S-42.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of I 51ll/2007 4:23 PM S-42 (PTD # 1960540) Classified as Problem Well e e \2&;q ?!Z,r-1!ðtp Subject: S-42 (PTD #1960540) Classified as Problem WeIJ From: "NSU, ADW Well Integrity Engineer" <NSUADWWcllIntcgrityEngineer@BP.com> Date: Mon, 27 Mar 2006 16:35:52 -0900 To: "Young, Jim" <Jim.Young@BP.com>, "GPB, GC2 Area Mgr" <GPBGC2TL@BP.com>, "Rossbcrg, R Steven" <Stcvcn.Rossbcrg@BP.com>, "NSU, ADW Wcll Operations Supervisor" <NSUADWWellOperationsSupervisor@BP.com>, "GPB, Wells Opt Eng" <GPBWel1s0ptEng@BP,corn>, "AOGCC Jim Regg (E-mail)..<jimJcgg@admi.l1.statc.ak.us>. "AOGCC Winton Aubert (E-mail)..<winton_aubert@admin.state.ak.us>...NSU.AD\V WL & Completion Supervisor" <NSUADWWL&CompletionSupervisor@BP.com>, "GPB, GC2 Wcllpad Lcad" <GPBGC2WellpadLead@BP.com> CC: "NSU, ADWWelllntegrity Engineer" <NSUADWWcllIntegrityEngincer@BP.com>, "Winslow, Jack L." <Lyonsw@BP.com>, "Hughes, Andrea (VECO)" <hugha4@BP.com> All, Well 8-42 (PTD #1960540) has been found to have sustained casing pressure on the IA. The TIO's on 03/321/06 were 2160/2130/130. Due to the activities in the GC2 Area, a TIFL has not yet been completed but is scheduled. The plan forward for this well is as follows: 1. DHD: TIFL 2. WIE: Evaluate for GLV change out 3. 8L: GL V clo 4. DHD: Re-TIFL i)~ A wellbore schematic has been included for reference. «8-42.pdf» The well has been classified as a Problem well. Please call if you have any questions. Thank you, }f.nna CDu6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 Content-Description: S-42.pdf Content-Type: application/octet-stream Content-Encoding: base64 .J:.t\ 21~; I~¡ M.T~ 7z~; 575lfs'.' ì M.8P 1.C} . f'Zt Z,3~ 5 c~ pi'? CI¿; 4th.. ¿" 4~"t J.A;rpl f ~:.? Q~ I of 1 3/28/2006 4:29 PM e TREE = 4"CIW SAFETYNOTES: SSSVN ST. #6,#5, & #4 COULD WB.LHEAD - FMC 5-42 ACfl.IA. TOR- BAKER BE DEEPER BY APPROX. 80'- CHROMETBGAND KB. ELEV - 71.79' LNR, 70° @ 9536' BF. ELEV = 37.1' KOP= 3787' Max Angle = 87 @ 10139' 2170' 4-1/2" HES HXO SSSV N, ID = 3.813" DatumMD= 9549' . DatumlVD = 8800' SS 19-5/8" CGS, 40#lFT, L-BO, BUTTRESS I 3077' r---J ~ Gð.S LIFT M6.NDRB.S Sl IVD lVD DEV TYPE VLV LATCH PORr DATE 6 3476 3474 6 KBG-2-LS DOME INT 16 08/15/03 L 5 5635 5254 44 KBG-2-LS DOME INT 16 08/15/03 4 6770 6253 9 KBG-2-LS DMV INT 0 04/29/96 3 7513 6994 1 KBG-2-LS DOME INT 16 08/15/03 ~ , 2 8264 7745 1 KBG-2-LS SIO INT 24 08/15/03 7" lBG, 29#/FT BELOW, 26#1FT A BOVE, MOD BUTT 8407' 1 9014 8492 19 KBG-2-LS DMV INT 0 07/19/98 "ALL MAI'ÐRELS TAKE1" MOD BTM LATCH VLVS . 9081' 4-1/2" HES X-NIP, ID= 3.813" I I Minimum ID = 3.725" @ 9137' I 4-1/2" HES XN NIPPLE :g ~ 9092' 7" X 4-112" BKR 8-3 PKR, ID = 3.875" I 9115' 4-1/2" HES X NIP, ID - 3.813" I 913T 4-1/2" HES XN NP, ID = 3.725" I 14-1/2"TBG, 12.6#, CR-NSCT, 9149' I 9149' 4-1/2" WLEG I .0152 bpf, ID = 3.958" I 9152' H ELIVD TT LOGGED 08111/96 I )- --I 9218' 7" x 4-1/2" TlWllEBACK SLY, ID - 5.277" I ~ 9224' 7" X 4-112" TIWWf SET PKR W/ HYDRO HGR I ð 7" SHOE, 29#1FT, MOD BUTT 9375' ~ [ ~ PERFORATION SLMM6. RY R8' LOG: I 10641' 1-14-1/2" CTCPAYZONEPKR I ANGLEA TTOP ÆRF: 46 @ 9378' N:Jte: Refer to A'oductbn DB for historical perf data I 10636' H FÐTD I SIZE SA= INlERV A L OpnlSqz DC>. TE / 2-3/4" 4 9378 - 9410 0 04/27196 2-3/4" 4 9490 - 9528 0 04/27196 , 2-3/4" 4 9690 - 9752 0 04/27196 2-3/4" 4 9770 - 9790 0 04/27196 ~ 2-3/4" 4 9850 - 10086 0 04/27196 /þI 2-3/4" 4 10110 - 10290 0 04/27196 2-3/4" 4 10415 - 10530 0 04/27196 14-1/2" LNR, 12.6#, CR-NCST, .0152 bpf, ID = 3.958" 10692' I DATE REV BY COIVMENTS DC>. lE RBI BY COMMENTS ffiUDHOE BA Y UNT 04/29/96 ORIG HORIZ COMPLETION WELL: 8-42 01/04/02 RNiTP CORRECTIONS PERMIT No: 1960540 04/01/02 DAV/KK GLV CORRECTIONS AA No: 50-029-22662-00 08/31/02 DlRITP MN ID CORRECTION/GL V C/O SEC35,T12N, R12E, 4181' FSL &4503' FEL 10/30/02 MHIKAK GLV C/O 08/15/03 DTRlKK GL V C/O BP Exploration (Alaska) Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job# Log Description Date BL H-01 A , q ~- - \ \ ~.J 10687663 LDL 01/04/04 1 J-24A 2~Ÿ -1\L1 10563218 SBHP SURVEY 09/28/03 1 E-05A \CjQ-030 10703984 SBHP SURVEY 04/10/04 1 A-13 I 3 J - ì S- t.} 10621770 PPROF W/DEFT/GHOST 03/22/04 1 C-17A i q '!- 6 )...) 10672332 LDL 10/27/03 1 F-46A :) C/o! - (, t ,-,( 10715389 MCNL 03/18/08 1 2-68/S-17 J 8 ;3 .. ~ 9 '1 10866550 PPROF WIDEFT 07/07/04 1 1-45/Q-26 / Be¡ ... /2 if 10568473 PPROF W/DEFT/GHOST 07/11/03 1 B-17 1 7 c¡- (:; ).. E~ 10679034 PSP INJECTION PROFILE 11/27/03 1 S-30 I c¡ t. -I C ~ G· 10560328 SBHP SURVEY 01/02/04 1 S-42 , t..1 L~ è fj '-f 10877777 SBHP SURVEY 08/22/04 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 :st:!\NNEJ R 2005 (,?ï.:D " ~,3 !__ ~ Date Delivered: ') " ) í ì .-' v.l.....:f...-"è". i;~) tM't-\ NO. 3438 ~q,~-1J 9t 07/20/05 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color CD ~. 13 ~t(J ---- Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 AnCh~rage, AK 995031838 / ATTN. Beth ./11 / . l t J Received by: I~> r'fl / C!kt~l TREE= 4" CIW SAFErYNOTES: SSSVN ST. #6,#5, & #4 COULD WFI LHEAD = FMCS 42 ACTUATOR = BAKER -- BE DEEPER BY APPROX. 80'- CHROM ETBGAND KB. ELEV = 71.79' LNR, 70° @ 9536' B E ELEV = 37.1' KOP 3787~ 2'170' 1-14-1/2" HES HXO SSSVN, ID = 3.813" MaxAn~le= 87~10139'~ I I/ Daturn MD = 9549; Datum'l'VD = 8800' SS ST IVD TVD DEV TYPE VLV LATCH PORT DATE ~lMinimum ID = 3.725" @ 9137' I 6 3476 3474 6 KBG-2-LS DOME BTM 16 08/20/02 I 5 5635 5254 44 KBG-2-LS DOME BTM 16 07/19/98 14-112" HESXN NIPPLE g 4 6770 6253 9 KBG-2-LS DMY BTM 0 04129196 3 7513 6994 1 I<BG-2-LS DOME BTM 16 07/19/98 2 8264 7745 1 KBG-2-LS S/O BTM 24 10/30/02 ' '--17"~e, 29~/FrBELOW, 26~FTABOVE, MODBLn-rl--I 8407' I ~- f 190148492 19 KBG-2-LS DMY BTM 0 07/19/98 X X '9092' , I-~7" x 4-1/z' BKR S-3 PKP, ID: 3.875"I ' 9224' Id 7" X 4-1/2" TIW WT SET PKR W/HYDRO HGR I PERFORAIION SUMMA RY ANGLEATTOP PERF: 46 @ 9378' I Note: Refer to R'oductbn DB for historical data 6 I--I--~-'¢~-I ' SIZE SPF INTERVAL Opn/Sqz DATE ~ 2-3/4" 4 9378 - 9410 O 04/27/96 i 2-3/4" 4 9490 - 9528 O 04/27/96 i 2-3/4" 4 9690 - 9752 O 04/27/96 2-3/4" 4 9770 - 9790 O 04/27/96 2-3/4" 4 9850- 10086 O 04/27/96 2-3/4" 4 10110 - 10290 O 04/27/96 2-3/4" 4 10415-1053O O 04/27/96 DATE REV BY! COIVIVIENTS DATE REV BY COMMENTS PRUDHOEBAY UNIT 04/29/96 ORIG HORIZ COIVPLB'ION 10/30/02 MI-t/KAK GL¥ C/O WELL: S-42 03/13/01 SIS-CS CONVERTED TO CANVAS PERMIT No: 1960540 03/14/01 SIS-MD FINAL APl No: 50-029-22662-00 01/04/02 RN/TP CORRECTIONS SEC35, T12N, R12E, 4181' FSL &4503'FEL 04/01/02 DAV/KK GLV CORRECTIONS 08/31/02 DTR/TP MIN ID CORRECTION/GLV C/O BP Exploration (Alas ka) PERFORATION S LIVIMA RY REF LOG: ANGLEATTOP FERF: 46 @ 9378' Note: Refer to R'oductbn DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-3/4" 4 9378 - 9410 O 04/27/96 2-3/4" 4 9490 - 9528 O 04/27/96 2-3/4" 4 9690 - 9752 O 04/27/96 2-3/4" 4 9770 - 9790 O 04/27/96 2-3/4" 4 9850- 10086 O 04/27/96 2-3/4" 4 10110 - 10290 O 04/27/96 2-3/4" 4 10415- 10530 O 04/27/96 DATE REV BY COIVIVIENTS DATE REV BY COMMENTS 04/29/96 ORIG HORIZ OOIVPLETION 10/30/02 IVH/KAK GLV CIO 03/13/01 SIS-CS CONVERTEDTO CANVAS 03/14/01 SIS-MD FINAL 01/04/02 RN/TP CORRECTIONS 04/01/02 DAV/KK GLV CORRECTIONS 08/31/02 DTR/TP MIN ID CORRECTION/GLV CIO STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate _ ACID TREATMENT Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~Ie, AK 99519-6612 5. Type of Well: Development _X Exploratory__ Stratigraphic__ Service__ 4. Location of well at surface 1098' FNL, 4503' FEL, Sec. 35, T12N, R12E, UM At top of productive interval 1486' FNL, 3424' FEL, Sec. 35, T12N, R12E, UM At effective depth 1913' FNL, 4224' FEL, Sec. 35, T12N, R12E, UM At total depth 1939' FNL, 4273' FEL, Sec. 35, T12N, R12E, UM ~sp~ 618929, 5980385) (asp's 620015, 5980014) (asp's 619223, 5979575) (asp's 619174, 5979548) 6. Datum elevation (DF or KB feet) RKB 72 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-42 9. Permit number / approval number 196-054 10. APl number 50-029-22662-00 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical 10692 feet Plugs (measured) 8965 feet Effective depth: measured 10636 feet Junk (measured) true vertical 8961 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 260 sx ArcticSet 145' 145' Surface 3042' 9-5/8" 850 sx CS III, 300 sx 'G' 3077' 3076' Intermediate 9340' 7" 270 sx 'G', 160 sx CS III 9375' 8782' Liner 1468' 4-1/2" 175 sx Class 'G' 9224' - 10692' 8667' - 8964' Perforation depth: measured Open Perfs 9378'-9410', 9490'-9528', 9690'-9752', 9770'-9790', 9850'-10086', 10110'-10290' Open Perfs (continued) 10415'-10530' true vertical Open Perfs 8786'-8806', 8851'-8867', 8889'-8894', 8896'-8898', 8904'-8922', 8923'-8934' Open Perfs (continued) 8943'-8951' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13 CR-80, TBG @ 9149' MD Packers & SSSV (type & measured depth) 7" x 4-1/2" BKR S-3 PKR @ 9092', 7" x 4-1/2" TIW WT SET PKR W/HYDRO HGR @ 9224'. ZON ,,10 41'. HXO p 13. Stimulation or cement squeeze summa~ ~.~., ~" .... ~,~,,,,~ ~,,,,~ ~ ~ ~ Inte~als treated (measured) (see attached) Treatment description including volumes used and final pressure ~ h~..~, '~~'"'/'~ "~,. ~"~.. ,~ 'q ~ ~ ~'~,/'"UU ~ ~, 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf W~ 0~,~. ~ ~~~~D' " ~ lng. Pressure Prior to well operation 04/06/2002 127 972 1630 ~C~0[~ 481 Subsequent to operation 04/20/2002 227 1500 4474 322 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations _ 16. Status of well classification as: Oil _X Gas _ Suspended _ Service 17. I hereby certify that the foregoing is_true and correct to the best of my knowledge. ,~~"~l,.~~J~~ - ~.-.~ Title: Technical Assistant DeWayne R. Scnnorr Form 10-404 Rev 06/15/88 · Date May 06, 2002 Prepared b), DeWayne R. Schnorr 564-5174 SCANNED MAY 2, 8 ;)DO;) SUBMIT IN DUPLICATE S-42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 03~28~2002 AC[D: DRIFT/TAG 04/10/2002 AC[D: LOAD WELL TO SECURE 04/10/2002 AC]'D: ACI'D TREATMENT 04/11/2002 AC:ID: ACTD TREATMENT 04/12/2002 ACID: AC]:D TREATMENT 04/13/2002 ACI'D: ACID TREATMENT EVENT SUMMARY O3/28/O2 DRIFT W/3.5" X 20' DMY WHPSTK TO 8975' WLMD -- RUN 3' 1-7/8" STEM & 3.5 CENT. TO 9530' WLMD -- RUN 3-3/8" DMY GN, 3.5 CENT. & SAMPLE BAILER TO 9464' WLMD. WELL BOL. 04/10/02 LOAD THE I.A. WITH 154 BBLS OF CRUDE PRIOR TO CTU WORK. 04/10/02 MIRU DS CTU #8 W/RIG UP APC TEST SEPERATOR. PRESSURE TEST ALL SURFACE LINES AND EQUIPMENT. WEEKLY BOP TEST. MU WEATHERFORD MHA AND PDS MEMORY LOG GR/CCL. ***JOB CONTINUED ON NEXT WSR*** 04/11/02 04/12/O2 ***CONTINUED FROM PREVIOUS WSR*** RIH W/LOGGING BHA. TAG UP AT 9795', SHORT TRIP, WORK TO 9999'. LOG UP AND FLAG PIPE AT 9900'. MU 3.5" JSN ON 3.625: WT BAR W/2.875" MHA (OAL --- 8.03'). START JETTING 12% DAD ACID @ 9500'. SAT DOWN AT 9981' & 10,001', 10,052'. SAT DOWN SOLID @ 10,072', UNABLE TO JET THROUGH. PUMPED 51 BBLS 12% DAD ACID FOLLOWED BY 51 BBLS 3% NH4CL. POOH. POP WELL WITH GAS LIFT & RIH WITH 2-7/8" MHA & 3.70" (3 BLADE)'JUNK MILL. MILL TO 10,400', WELL FLOWING THRU APC. RECOVER JET/GLV TIP IN MILL WHEN OOH. ***CONTINUED ON NEXT WSR*** ***CONTINUED FROM PREVIOUS WSR*** MU MHA, 3.625: WT BAR, MEMORY GR/CCL W/3.625" SWAGE. BHA OAL 18.27'. LOAD IA W/CRUDE, LOAD AND KILL WELL W/KCL CAPPED W/CRUDE. RIH LOG AND FLAG FROM 10350' TO 9600'. PU WFD STRADDLE PACKER ASSY, (OAL = 32.91'). RIH TO 9600' PREFORM INJECTION TEST. (RATE 1.3, WHP - 150 PSI, CTP 1700 PSI), (RATE 1.8, WHP - 180, CTP - 3150 PSI), (RATE 2.1, WHP = 200 PSI, CTP - 3940 PSI). LAUNCH BALL AND TEST STRADDLE TO 3000 PSI. RIH AND CORRECT TO FLAG. ACIDIZE W/12% HCL, W/FE LESS THAN 22 PPM AND 9.1% HCL/1.3% HF, FE LESS THAN 22 PPM. PRE-FLUSH AND OVERFLUSH W/3% NH4CL. INTERVALS 10250'- 10270', 10180'- 10200', 10115'- 10135'. ***CONTINUED ON NEXT WSR*** Page I 04/13/O2 S-42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ***CONTINUED FROM PREVIOUS WSR*** ATTEMPT TO GET GOOD PKR SEAL AT 9725' - 9745'. WORK PKR, SET TOP ELEMENT AT 9722'. TREAT W/12% HCL AND 9/1 - HCL/HF, FLUSH W/NH4CL. FREEZE PROTECT CT. POH. SECURED WELL, POP THROUGH APO SEPERATOR FOR FLOWBACK/CLEAN UP/4 HR TEST AFTER STABLE FLOW. (PIGGYBACKED W/WPS). Fluids Pumped BBLS 0 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( 0 TEST) 220 60/40 METHANOL WATER 270 2% KCL WATER 290 2% SLICK KCL WATER 125 DIESEL 369 CRUDE 51 12% DAD ACID 250 NH4CL ACID 51 3% NH4CL ACID 100 12% HCL ACID 200 9/1 - HCL/HF ACID 1926 TOTAL Page 2 red rvices rilling 900 East Benson Boulevard, MB 8-1 · Anchorage, Alaska 99508 (907) 561-5111 Fax: (907) 564-5193 December 14, 1998 Wendy Mahan Natural Resource Manager Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501-3192 RECEIVED Re: Annular Disposal Information Request DEC 14 1998 Dear Ms. Mahan: Alaska Oil & Gas Cons. Commission Anchorage On October 28, 1998 you requested an update from Shared Service Drilling regarding Annular Disposal Records from July 25, 1995 through present time. We compared yOur list with our records and are able to provide yOu with the following data: · Individual Annular DiSposal Logs from the SSD database Which coincide with the approved wells on your attached AOGCC Annular Log. The SSD records are proVided to you' in the same order as listed on your log. · There were some wells on your list which were not injected into. These wells are identified as follows: · . Endicott wells 1-03/P-16, 1,65~-25~ 1-59/0-24 · EXploration well Pete's Wicked #1 · Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30, L-21, K-38, NMP #1 & #2, K-05, K-02, 1-1-07, K-25, K-37, E-17, F-21, K-30, K-34, K,21i, F-66, K-06, K-54, K-33~ F-49i, K-18 · PBU Wells E-38, 18-34, 15,42, S,29A, 15-46, B-36, 15-43, 11-38 · The reason many of these annuli were not used is because the waste materials generated froTM these wells were injected into other approved annuli. Hopefully the injection logs submitted with this letter will clarifY this. In addition, please note that our records show: · The wells listed above in italics were permitted but not used for annular disposal. · The wells listed above in BOLD were not permitted for annular disposal. Wells drilled after June 6, 1996 were required by SSD procedure to be permitted with a SUndry " Approval (10-403) form. Our records show that no Sundry Approval for Annular Disposal was filed for these wellsl Wells drilled between July 25, 1995 and june 6, 1996 were automatically approved for annular disposal with the Permit to Drill. · We also provide .you with a cumulative report from our database of records from July 25, 1995 through the present. From those records, we show the following wells not listed on your report were used for annular disposal: ,, ,Annular Disposal Letter .'. 12/14/98 Endicott wells i-23/O-15, 1-61/Q-20, 2-40/S-22 · · Exploration well Sourdough #3 - · Milne Point wells F-06, H-05, H-06, J, 13, L-24 - ~-~ · PBUwells-18-30, 18-31, 14-~,~-43, E-34, E-36, G-~A,~dS-33-~'~°~ · Individual logs ~e provided to ~ou for these ~ogs as we~l. · Finally, our records show that the B-24 outer annulus was left open (see attached correspondence) Thank you for the opportunity to provide clarity to these records. If I can be of any further assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental Advisor at 564-4305. Sincerely, Fritz P. Gunkel Shared Service Drilling Manager FPG/KMT cc: Dave Wallace - HSE Manager (w/out attachments) RECEIVED hlaska Oit & Gas Cons. ,Oommissio'~ Anchorage -~.~ANNULAR INJECTION DATA ENTRY SCREEN Asset .V~.QA .......................................... Rig Name ~.~.~.r.$..~.t3.F,, ............................. Inj Well Name ~;.:.4.:~ ............................................ Sur Csg Dep ~.0.7..7.. ................ Cumulative Data Legal Desc ~3.f~.c..~,5.,.I.1.~b[,..l~l~]~. .............................. i ........................................... -. Research Permit Start ,.'. ..... .3/..1.3.Lg. fi ........ permit End ........ ~/.~1.~/.~.7., ........ Rig ComPletion Formation Intermittant Well Total Mud/Ctg Wash Fluids Fluids~ , -: Freeze: Final Freeze Daily Data S-42 ~04/29/96 68 68 800 PSI WELL SECURED [ Open '1 ........ : ............................................................................................................................................................................. A h ared e ioes rilling TO: Blair Wondzell FROM' Chris West DATE: October 27, 1995 SUBJECT: MPB-24 Well Suspension APl # 50-029-22642 Blair; Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20- AAC 25.110. As discussed 'this morning we propose Setting three plugs in this well as detailed in the attached form. This will allow us to retain the wellbore for potential future sidetrack or service well use. We would like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid 'wastes. There are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the rig. Thank you for your help in this matter. Please call. me if I maY be of any assistance. Chris West Drilling Operations Engineer Nabors 27E (907)-564-5089 Shared SerVice [hilling Annd;Tar Injection Volumes July 25, 1995 until December 1998 Cumulative Report Surface Casing ' ' Rig Inj Well Depth Legal Desc Endicott Cum Mud Cum Total & Ctgs Doyon 15 1-19/I-18 5000 Sec. 36, T12N, R16E 8,960 7,848 - . . Doyon 15 1-23/0-15 4246 2020'FNL, 2087'FEW, SEC.36,T12N, R16E 32,084 30,604 Doyon 15 1-33/M-23 5013 3217'NSL, 2114'WEL, Sec 36,T12N, R16E 9,879 9,729 Cum Rig Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus Wash Fluids Fluids Freeze Freeze Stad End Slalus 992 120 12/5/95 12/5/96 Open 1,160 200 120 9/30/95 12/31/95 Open 150 8/31/95 12/31/95 Broached Doyon./_5 . 1-61/Q-20 4236 3075'NSL, 2207'WEL, Sec 13,T12N, R16E 25,228 2~,379 . Doyon 15 2-40/S-22 4531 2020'FNL 2289'FEL Sec 36 T12N R16E 31 195 29 952 ................................................. ,_ ..... .,_ ......,. ....... : .............. -, .. ...........~- ........ EOA 1,063 120 60 7/25/95 12/31/95 Open D~0?n~l__4- ........ 1_.5-_47 ........ _3~51_5__ 3648'NSL, 4956'WEL, Sec 22,T11N, R14E 3,002 903 2,009 90 11/7/95 12/31/95 Open ~)oyon 14 DS 15-45 3829 4749' NSL, 5180' WEL, Sec. 22, T11 N, 1,882 1,697 134 51 4/4/96 4/4/97 Broached ~)oyon 14 DS 15-48 3548 Sec. 22, T11N, R14E 3,385 216 820 2,283 66 12/21/95 12/21/96 Open ~)oyon 14 DS 15-49 3667 4676' NSL, 5165' WEL, Sec. 22, T11N, 4,669 1,559 1,141 1,904 65 2/21/96 2/21/97 Open ;)oyon g ' 18-30 3930 1499'SNL, 26'WEL, Sec 24,T11N, R14E 2,266 936 380 800 150 7/25/95 12/31/95 Open )oyon g 18-31 3680 3719'NSL, 64'WEL, Sec 24,T11N, R14E 6,086 2,250 1,100 2,565 171 7/26/95 12/31/95 Open )oyon 9 18-32 3830 3632'NSL, 41'WEL, Sec 24,T11N, R14E 3,311 1,861 200 1,100 150 8/24/95 12/31/95 Open )oyon g 18-33 4140 3690'NSL, 56'WEL, Sec 24,TllN, R14E 5,215 2,050 3,035 10 120 9/28/95 12/31/95 Open i.a?ors 18E 12-35 3543 348'NSL, 705'WEL, Sec 18,T10N, R14E 3,723 3,436 137 150 9/1/95 12/3175 Open labors 18E 12-36 3452 63'FSL, 899'FEL, Sec 18,T10N, R15E 4,002 1,961 50 1,871 120 10/13/95 12/31/95 Open labors 18E 13-36 3431 1585'NSL, 5187~NEL, Sec 13,T10N, R14E 4,137 3,523 464 150 10/26/95 12/31/95 Open labors 18E 14-44 3288 2829'NSL, 1617WVEL, Sec 9,T10N, R14E 3,974 2,319 1,535 120 8/17/95 12/31/95 Open xploration ool 4 Sourdough #3 4236 2245'FSL, 5067' FEL, Sec. 29, T9N, R24E 5,786 4,630 1,156 1/26/96 1/26/97 Closed lilne 27E MPK-17 3508 3648'NSL,2100'WEL, Sec.03,T12NR11E 19,608 18,538 285 685 100 4/18/96 4/18/97 Open abors 22E MPC-23 4941 1038 NSL, 2404 WEL, Sec 10,T13N, 2,060 1,800 130 130 1/25/96 1/25/97 Open abors 22E MPC-25 8595 1143'FNL, 2436'FWL, Sec 10,T13N, R10E 1,905 1,465 300 140 1/5/96 1/5/97 Open abors 22E MPC-26 4704 1086 NSL, 2419 WEL, Sec 10,T13N, 5,228 4,483 555 190 12/19/95 12/19/96 Open abors 22E MPC-28 5405 Sec 10,T13N, R10E 425 350 75 2/15/96 2/15/97 Open Page 1 Shared Service Drilling Annular Injection Volumes July 25, 199S until December 1998 Cumulative Report Rig Inj Well- . Nabors 22E MPF-06 Nabors 22E MPF-14 Nabors 22E MPF-70 Nabors 22E MPH-05 Surface Casing Cum Mud Cum Rig Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus Depth Legal Desc Cum Total & Ctgs Wash Fluids . Fluids Freeze.. . Freeze Start End Slalus 8766 Sec 06,T13N. R10E 1.927 1.731 196 1/25/96 1/25/97 Open 6690 .. Se~'_06,_T13N, R10E_ UM 18,717 17,107 1,270 340 6/3/96 6/3/97 Open _. 7919 2189'NSL, 2591'WEL, Sec 6,T13N, R10E 19,775 18,794 735 190 56 6/17/96 6/17/97 Open .......... 5335 2882'NSL, 4028'WEL, Sec 34,T13N, R10E 8,283 7.711 382 190 8/19/95 12/31/95 Open Nabors 22E MPH-06 Nab°rs 22E MPI-07 Nab°rs 22E UPU-13 7304 2824'NSL, 4044'WEL, Sec 34,T13N, R10E 8,515 8,335 2680 2339'NSL, 3906'WEL, Sec 33,T13N, R10E 1,680 1.280 250 2835 2319'NSL. 3179'WEL, Sec 28,T13N. R10E 14,127 13,292 645 180 8/5/95 12/31/95 Open 80 ' 70 9/21/95 12/31/95 Open 60 130 10/17/95 12/31/95 Open Nabors 22E MPJ-16 3112 Nabors 27E B-24 4080 2317'NSL, 3336'WEL, Sec 28,T13N, R10E Sec 18,T13N, R11E UM 985 915 1,468 1,396 72 70 11/12/95 12/31/95 Open 1/25/96 1/25/97 Open 70 12/1 2/95 1 2/1 2/96 Open Nabors 27E MPF-22 8841 Sec 06,T13N, R10E UM 6,536 6,466 Nabors 27E MPF-25 12/26/96 3405 1857'NSL 2696'WEL, sec 6,T13N, R10E ' 9,897 9,357 250 225 65 12/26/95 Open Nabors 27E MPF-37 6621 1931'NSL, 2643'WEL, Sec 6,T13N. R10E 7,032 6,887 70 75 7/25/95 12/31/95 Open Nabors 27E MPF-38 8561 1994'NSL, 2731'WEL, Sec 6,T13N, R10E 9,232 9,157 75 12/6/95 12/31/95 Open Nabors 27E MPF-45 6678 1979'NSL 2608'WEL, Sec 6,T13N, R10E 17,562 17.381 181 7/31/95 12/31/95 · Open Nabors 27E MPF-53 6750 2028'NSL 2572'WEL, Sec 6,T13N, R10E 6,051 5.671 165 75 60 80 8/19/95 12/31/95 Open Nabors 27E MPF-61 6585 2077'NSL 526'WEL; Sec 31,T14N, R10E 5,732 5,657 75 8/31/95 12/31/95 Open Nabors 27E MPF-62 6059 2141'NSL 2627'WEL, Sec 6,T13N, RIOE 386 316 70 10/13/95 12/31/95 Open Nabors 27E MPF-69 5772 2125'NSL, 2502'WEL, Sec 6,T13N, R10E 9,740 91665 75 8/31/95 12/31/95 Open Nabors 27E MPF-78 7085 2237'NSL, 2555~NEL, Sec 6,T13N, RIOE 8,476 7,456 40 775 65 140 9/12/95 12/31/95 Open Nabors 27E MPL-24 6515 3654'NSL, 5180'WEL, Sec 8,T13N, RIOE 6,790 4,900 1,320 165 335 70 11/27/95 12/31/95 Open WOA 18E F-33 3570 3332'NSL, 2174'WEL, Sec 2,T11N, R13E 1,468 183 660 465 160 2/21/96 2/21/97 Open 18E F-36 3691 2642'NSL, 2878'WEL, Sec 2,TllN, R13E 6,963 ' 1,998 1,359 3,471 135 12/18/95 12/18/96 Open -_ Doyon 9 D-30 3456' 3625' NSL, 1066' WEL, SEC. 23, T11N, 5,261 2,811 1,275 1,035 140 1/31/96 1/31/97 Open 3oyon 9 D-31 3215 SEC. 26, T11N, R13E 150 150 4/20/96. 4/10/97 Open ;)oyon 9 D-33 3222 2965' NSL, 1067' wEL, SEC. 23; TllN, 4,661 2,425 2,106 130 2/21/96 2/21/97 Open qabors 18E S-43 3121' 4211'NSL,4503'WEL,SEC35,T12N,R12E 5,943 2,636 1,716 1,511 80 5/7/97 - 5/7/98 OPEN Page Shared S'.ei~vice D[illing Ann~ul~r InjeCtion Volumes July 25, 1995. until December 1998 Cumulative Report Surface Casing Rig Inj Well Depth NabOrs 28E B-33 3504' . _ Nabors 28E E-34 3664 · . Nabors 28E' E-36 3648 Nabors 28E E-37 3810 Cum Mud ' Cum Total & Ctgs Legal Desc 969'SNL, 1898'EWL, Sec 31, T11N~. R_!4E .... -3'-9-7.4- .... -2-'~-42 168'SNL, 500'WEL, Sec 6, T11_N, R14E 9,656 7,228 .. . __ . 1706'SNL, 822'WEL, Sec 6~T11N, R14E 9,271 4,417 - _ _ ._ 3391'NSL, 881'WEL, Sec 6,T11N, R14E 4,695 4,241 Cum Rig Cum Compl Cum Form Cum Interrn Cum Final Wash Fluids Fluids Freeze Freeze 857 ........ 195 80 .......... _. 1,420 858 40 110 . 1,2_93~ ..... 3,_0--9_6 ........ 365 ....... 100 374 80 Disposal Period Annulus Start End Slalus 5/1/96 12/31/96 Broached .. . 8/23/95 12/31/95 Open _ . 7/25/95 1 2/31/95 Open ·. 9/16/95 12/31/95 Open Nabors 28E E-39 3638 3358'NSL 501'WEL, Sec 6.T11N, R14E Nabors 28E G-04A 3509 2917'NSL 1974'WEL, Sec 12,TllN, R13E Nabors 28E G-21 3509 2911'NSL 2368'WEL, Sec 12,T11N, R14E Nabors 28E S-24 2750 1633'SNL 4228'WEL, Sec 35,T12N, R12E Nabors 28E S-33 2958 1639'SNL, 1487'WEL, Sec 35.T12N. R12E 2,250 928 220 1,022 5.937 1.798 1,824 2,315 11,430 3,956 3,072 4,270 20,261 il,773 2,177 5,751 18,014 6,613 2,431 8,392 80 8/28/95 1 2/31/95 Open ..... 10/20/95 12/31/95 Open 70 62 9/8/95 12/31/95 Open 275 285 12/9/95 12/9/96 Open 270 308 12/1/95 1 2/1/96 Open Nabors 28E S-41 3331 4152' NSL, 4504' WEL, Sec 35,T12N, 8,062 4,159 2,034 1.754 Nabors 28E S-42 3077 Sec 35, T12N, R12E 168 100 Nabors 2ES H-35 3157 4535'NSL, 1266'WEL, sec 21,T11N, R13E 4,860 3,725 555 480 20 80 10/26/95 12/31/95 Open Nabors 2ES H-36 3550 4478'NSL, 1265'WEL, Sec 21,T11N, R13E 1,452 857 100 410 85 10/26/95 ..... 12/31/95 Open 115 2/8/96 2/8/97 Open 68 3/13/96 3/13/97 Open NOV 3 200 , Page 3 AOGCC Individual Well Geological Materials Inventory PERMIT DATA T DATA PLUS Page: 1 Date: 05/13/98 RUN DATE RECVD 96-054 Z DENS ~ SEPIA ~1- ~-P5 t~3) i 05/01/96 96-054 BHP ~ SEPIA 1 05/01/96 96-054 DIFL i 05/01/96 96-054 SSVD i 05/01/96 96-054 FMT 1 05/01/96 96-054 96-054 DAC 7200 ~EPIA %%~ i - 7) ~> ~MLL / DAC / ZDL / NPH I / GR 1 05/01/96 DIFL/ 05/01/96 96-054 RES/NGP - MD -L~5098-10692 FINAL 12/05/96 96-054 RES/DGR/NGP-TVD ~'~4901-8966 FINAL 12/05/96 96-054 96-054 96-054 RES/NGP-MD J~5098-10261 PB1 RES/NGP-TVD '-L~4901-9128 PB1 7581 ~/3-5,9-11 SPERRY GR/RES FINAL 12/05/96 FINAL 12/05/96 02/05/97 96-054 96-054 7582 STAT PRES SRVY ~/SPERRY GR/RES PB1 3-7 02/05/97 FINAL 10/21/97 96-054 LEAK-SPIN/TEM/ 10-407 PRES 0-9218 ~OMPLETION DATE FINAL 12/05/97 DAILY WELL OPS R ~//~ /~/ TO ~//~ ~/ ~'v/ received? Are dry ditch samples required? yes Was the well cored? yes n~Analysis & description received? Received? Are well tests required? yes Well is in compliance ~ Initial COMMENTS ye ~----no~ STATE OF ALASKA ALAS~--~, OIL AND GAS CONSERVATION COMMISS!''~-'-. REPORT L .: SUNDRY WELL OPE...ATIONS 1. Operations performed: Operation shutdown__ Stimulate x Plugging__ Pull tubing__ Alter casing __ Repair well Perforate__ Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchora_cle, Alaska 99519-6612 4. Location of well at surface 4181' NSL, 4503' WEL, SEC. 35, T12N, R12E At top of productive interval 3793' NSL. 3424' WEL. SEC. 35, T12N, R12E At effective depth 1912' NSL, 4223' WEL, SEC. 35, T12N. R12E At total depth 3341' NSL, 4271' WEL. SEC. 35. T12N. R12E 5. Type of Well: Development '.~ Exploratory __ Stratigraphic .__ Service __ 6. Datum elevation (DF or KB) KB = ?lr 79' 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number S-42 9. Permit number/approval number 96-054 / 10. APl number 50 - 029-22662 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural .. Conductor 110' Surface 3042' Intermediate 9340' Production .. Liner 7736' Perforation depth: measured 10692' feet Plugs (measured) 8965' feet 10636' feet Junk (measured) 8961' feet ORIGINAL Size Cemented Measured depth 20" 260 sx Arctic Set 145' 9-5/8" 850 sx CS III, 300 sx 3077' 7" 270 sx Class '_(7', 160 sx 9375' 4-1/2" 175 sx Class 'G' 9214'- 10692' True vertical depth BKB 145' 3O77' 8781' 8669'-8964' 9378'-9412', 9490'-9528', 9690;9752', 9770'-9790', 9850;10086', 10110;10290', true vertica§ubsea 8786'-8808', 8851'-8867', 8889'-8894', 8896'-8898', 8904'-8922', 8923'-8934', Tubing (size, grade, and measured depth)4-1/2" @ 9149' Packers and SSSV (type and measured depth)Packer @ 9092' SSSV @ 2170' 13. Stimulation or cement squeeze summar~See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 772 1840 4242 0 892 3236 2498 246 Tubing Pressure 255 151 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: OilX Gas__ Suspended__ Service 17. I hereby certify that Jhe fo/~going is true.~n,d Form 10-404 Rev 06/15/88 ~ correct to the best of my knowledge. Title TechnicalAssistantlll SUBMIT IN DUPLICATE State of Ala;, Alaska Oil & Gas Conservation Comm. Atten: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Transmittal of Final Prints. Please sign and return copy to' Western.Altas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 19-Oct-97 iWeli Name Services i!K-11 ~"/- II-/ iCN/GR/CCL CCLFFUBING CU-I-TER STATIC PRESSURE iSTATIC PRESSURE GR/CCL JEWELRY LOG I Bluelines I R/F Sepia i Film RECEIVED Contact Rebecca Lange if'you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. S-42 DESCRIPTION OF WORK COMPLETED NRWO(Gel) Operation 09/18/97 A NRWO Gel WSO Squeeze was performed on the interval using the following fluids: SUMMARY Loaded annulus with dead crude, killed well with seawater. Staged gel fluids according to schedule shown below while intermittently pumping diesel down ia to prevent gel getting behind pipe. Pressure response dictated reduced planned pump schedule. The job was pumped smoothly and without incident. Completed job at - 1400 hrs 9/19. Tagged well not to put on production until 9/24/97 after 1400 hrs and Bob Thayer as contact. FLUIDS PUMPED Fluid Summary 190 I Seawater. 278 I 3000 ppm gel. 4780 ] 5000 pprn gel. 500 I 7500 ppm gel. 540 I 9000 ppm gel. 25 I 5000 ppm gel w/o cross link. 173I Diesel. 190 I Bead Crude. 6676 I Total AOGCC DIVERTER SCHEMATIC NABORS RIG 28E BPX PBU S-42 Main S-Pad Satellite Pad Access II I I II I IIII I I I I ~:F ~ New Flowlines Under Consh'ucfion / ~ / :' .\. ~ T~oga Heater -~ ~ '~ this area :~ ...... / ~ 21 114" MSP ~nular Preventer ~ 16" F/O Knife Valve Satellite S-Pad EIRHDEDD.XLS WELL LOG TRANSMITI'AL To: State of Alaska February 5, 1997 Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor / Cd 3001 Porcupine Dr. / 0%/owo \ / Anchorage, Alaska 99501 ~ ~ 55' "k ~'"~'~ RE: MWD Formation Evaluation Logs - S-42 & S-42 PB1 AK-MM-60416 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jan Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2 LDWG formatted LIS tapes with verification listing. API#: 50-029-22662-00 & 50-029-22662-70 respectively. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company 0 I:t I I__t-- I I~1G S I:: I=! L/I r" E S WEI~I~ LOG TRANSMITTAL To~ State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Howard Okland 3001 Porcupine Drive Anchorage, Alaska 99501 November 25, 1996 RE: MWD Formation Evaluation Logs S-42 & S-42 PB 1, AK-MM-960416 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Yah Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 S-42: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22662-00 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22662-00 S-42 PB1: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22662-70 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22662-70 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 .. (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASr~ OIL AND GAS CONSERVATION CUMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 96-054 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22662 4. Location of well at surface ~._~.~ ~ 9. Unit or Lease Name 4181' NSL, 4503' WEL, SEC. 35, T12N, R12E ~ .... ~;_.~, ?;~ .~.~ ? Prudhoe Bay Unit At top of productive interval /~.. ,~;j 10. Well Number 3793' NSL, 3424' WEL, SEC. 35, T12N, R12E . S-42 At total depth ! ~FI~:'r~ .~ 11. Field and Pool 3341' NSL, 4271' WEL, SEC. 35, T12N, R12E i -~~---_- ~ "~ ........ "~ Prudhoe Bay Field/Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease DeSi~fi-~tion and Serial No. Pool KBE = 71.79'I ADL 028257 12. Date Spudded04/04/96 113' Date T'D' Reached I14' Date C°mp'' Susp'' °r'Aband'll 5' Water depth' if °fish°re 16' N°' °f C°mpleti°ns04/23/96 ~'f~:J79~-¢',/23/'~'~'I N/A MSL One 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~l. Thickness of Permafrost 10692 8965 F~ 10636 8961 F~ [~Yes i-INo I 2170' MD! 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, DIFL, ZDL, CN, GR, AC, RFT, FMT 23. CASING, LINER AND CEMENTING RECORD CASING SE-I-FING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 34' 3077' .~ 12-1/4" 850 sx CS Ill, 300 sx 'G', 300 sx CS II 7" 26/29# L-80/13Cr 33' ~ 9375' ~ 8-1/2" 270 sx Class 'G', 160 sx Class 'G' / 4-1/2" 12.6# 13-Cr 9214' ~- 10692" 6" 175 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 4-1/2" 9149' 9092' ~,. MD TVD MD TVD 9378' - 9412' 8786' - 8808' 9490' - 9528' 8851' - 8867' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. 9690' - 9752' 8889' - 8894' 9770' - 9790' 8896' - 8898' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9850'- 10086' 8904' - 8922' Freeze Protect w/73 Bbls Diesel 10110'- 10290' 8923' - 8934' 10415' - 10530' 8944' - 8953' 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) May 13, 1996 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD ~1~ I Flow Tubing Casing Pressure 0ALCULATED I~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (COBB) Press. __A-HouR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED ORIGINAL AiJ~lm 011 & Anchor~e Form 10-407 Rev. 07-01-80 Submit In Duplicate -~' Geologic Ma~..s 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Sag River 9369' 8779' Shublik 9429' 8818' Top of Sadlerochit 9728' 8892' 31. List of Attachments Summary of Daily Drilling Reports, Surveys, Annular Pumping Report 32. I hereby certify that,~ f~rego~correct to the best of my knowledge Signed Dan Sto~ ,/(,.,~/Z,'Z Title Drilling Engineer Date./,,,,¢ ~. ~ Senior - ~ Prepared By Name/Number Terrie Hubble,'" " 564-4628 INSTRUCTIONS GENERAL' This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. R£C£1VF-D Form 10-407 Rev. 07-01-80 JUN 0 1996 VOLUME {BBLS Method of displosal=pumping down outer annulus DIESEU FREEZE I .... I SOURCE WELL DATE OF MUD/CTGS BRINE WATER ~ Dai~y ~um. ~ota~l COMPLICATIONS, COMMENTS NUMBER INJECTION PROT. I I I S-42 4 / 1 9 / 9 6 10 0 ~ ~?~ :~ ~ ~ ~ ~ :,~[~'~ 800 PSI ANNULAR INJECTION DATA ENTRY SCREEN Source [ Wel A s s e t .~/OA. ......................................... Rig Name .N~b~3r.s..2,SE ........................... Inj Well Name'i'.S.~i.42.1:i; ...................................... Permit Sur Csg Dep .3.0.ZZ .............. Cumulative Data Legal Desc .S~c..3.5....T.12N...B.].2.E ........................................................................ Research ........................................................................................................................ C e r~,ec.t, ed..copy...s¢p,,t ..b3..,&QGC.C...2.;2~.=,9~. ............... Start ..... R,,/..1.3.,/.9.6 ..... Permit End ..... 3.,/..1.3.,/.9..7. ..... I ~ Rig CompletiOn Formation Well T0tal MUd/Ct,q : Wash FlUids :Fluids Date of Injection Daily Data iMud Ctgs Cml~ I Completi0n IIntermittant Final ' - [ ' Contaminated Rig Wash : FOrmation Freeze Freeze AnnulUs, : Ddg Mud Fluids Fluds FlUids Protection I Protecli0n I Tolal :~ ::~: Ratel: PressureI status commentS ComPlicationS 100 800 PSI 800 PSI WELL SECURED SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: S-42 Rig Name: Nabors 28E AFE: 4P0754 Accept Date: 04/03/96 Spud Date: 04/04/96 Release Date: 04/29/96 Apr 3 1996 (1) -Held safety meeting. Rigged down Drillfloor / Derrick. Rig moved 100 %. Rigged up Drillfloor / Derrick. Apr 4 1996 (2) Rigged up Drillfloor/Derrick. Rigged up Divertor. Fill pits with Water based mud. Tested Divertor. Held safety meeting. Made up BHA no. 1 Circulated at 10312.3 ft. Drilled to 10626.3 ft. Apr 5 1996 (3) Drilled to 11797.3 ft. Serviced Mud shakers. Drilled to 12370.3 ft. Circulated at 12370.3 ft. Pulled out of hole to 11056.3 ft. R.I.H. to 12370.3 ft. Drilled to 12856.3 ft. Serviced Mud shakers. Apr 6 1996 (4) Drilled to 13293.3 ft. Circulated at 13293.3 ft. Pulled out of hole to 11056.3 ft. R.I.H. to 13293.3 ft. Circulated at 13293.3 ft. Pulled out of hole to 11056.3 ft. Pulled BHA. Rigged Up Casing handling equipment. Held safety meeting. Ran Casing to 13283.3 ft (9.625 in OD). Circulated at 13283.3 ft. Pumped spacers - volume 75 bbl. Mixed and pumped slurry - 290 bbl. Mixed and pumped slurry - 61 bbl. Displaced slurry - 227 bbl. Circulated at 10286.3 ft. Mixed and pumped slurry- 51 bbl. Rigged down Casing handling equipment. Rigged down Divertor. Apr 7 1996 (5) Rigged down Divertor. Installed Casing spool. Rigged up BOP stack. Rigged up BOP stack. Installed BOP test plug assembly. Tested BOP stack. Installed Wear bushing. Made up BHA no. 2 . R.I.H. to 13106.3 ft. Serviced Block line. Washed to 13202.3 ft. Tested Casing - Via annulus and string. Drilled installed equipment - Float collar. Apr 8 1996 (6) Drilled installed equipment - Float shoe. Circulated at 13303.3 ft. Drilled to 14740.3 ft. Circulated at 14740.3 ft. Pulled out of hole to 13256.3 ft. R.I.H. to 14740.3 ft. Drilled to 15306.3 ft. Circulated at 15306.3 ft. Pulled out of hole to 12206.3 ft. Operations Summary for: _ -42 Apr 9 1996 (7) Pulled out of hole to 11056.3 ft. Pulled BHA. Made up BHA no. 3. R.I.H. to 15306.3 ft. Drilled to 16651.3 ft. Apr 10 1996 (8) Drilled to 17649.3 ft. Circulated at 17649.3 ft. Pulled out of hole to 13256.3 ft. R.I.H. to 15206.3 ft. Apr 11 1996 (9 ) R.I.H. to 17649.3 ft. Circulated at 17649.3 ft. Pulled out of hole to 11056.3 ft. Pulled BHA. Ran electric logs. Apr 12 1996 (10) Ran electric logs. Repaired Standpipe manifold. Made up BHA no. 4. R.I.H. to 17589.3 ft. Reamed to 17651.3 ft. Drilled to 18221.3 ft. Apr 13 1996 (11) Drilled to 8850 ft. Circulated at 8850 ft. Pulled out of hole to 845 ft. Pulled BHA. Retrieved Wear bushing. Tested BOP stack. Apr 14 1996 (12) Tested BOP stack. Installed Wear bushing. Made up BHA no. 5 . R.I.H. to 3000 ft. Serviced Block line. R.I.H. to 8765 ft. Reamed to 8850 ft. Drilled to 9346 ft. Apr 15 1996 (13) Drilled to 9492 ft. Circulated at 9492 ft. Pulled out of hole to 850 ft. Pulled BHA. Made up BHA no. 6. R.I.H. to 9271 ft. Reamed to 9492 ft. Drilled to 9565 ft. Circulated at 9565 ft. Drilled to 9570 ft. Circulated at 9570 ft. Drilled to 9600 ft. Apr 16 1996 (14) Drilled to 10046 ft. Circulated at 10046 ft. Pulled out of hole to 9000 ft. Apr 17 1996 (15) Pulled out of hole to 850 ft. Pulled BHA. Made up BHA no. 7 . R.I.H. to 9980 ft. Reamed to 10046 ft. Circulated at 10046 ft. Drilled to 10261 ft. Circulated at 10261 ft. Rest hole at 10261 ft. Pulled out of hole to 9321 ft. Rest hole at 9321 ft. Circulated at 9321 ft. Pulled out of hole to 8381 ft. Page 2 RECEIVED JUN 0 ~ 1996 Alaska 011 & Gas Cons. Commission Anchorage Operations Summary for: _.-42 Apr 18 1996 (16) Rest hole at 8381 ft. Pulled out of hole to 320 ft. Pulled BHA. Serviced Drillfloor / Derrick. Made up BHA no. 8. R.I.H. to 2100 ft. Singled in drill pipe to 3077 ft. Circulated at 3077 ft. Serviced Block line. R.I.H. to 10000 ft. Circulated at 10000 ft. R.I.H. to 10261 ft. Circulated at 10261 ft. Pumped spacers - volume 13 bbl. Mixed and pumped slurry - 85 bbl. Displaced slurry - 150 bbl. Pulled out of hole to 10 ft. Apr 19 1996 (17) Pulled BHA. R.I.H. to 1300 ft. Laid down 1300 ft of 5 in OD drill pipe. Made up BHA no. 9. R.I.H. to 8843 ft. Washed to 9245 ft. Drilled cement to 9385 ft. Circulated at 9385 ft. Pulled out of hole to 8400 ft. R.I.H. to 9385 ft. Circulated at 9385 ft. Laid down 7600 ft of 5 in OD drill pipe. Held safety meeting. Laid down 9300 ft of 5 in OD drill pipe. Held safety meeting. Rigged up Top ram. Rigged up Casing handling equip- ment. Ran Casing to 2000 ft (7 in OD). Apr 20 1996 (18) Ran Casing to 4000 ft (7 in OD). Serviced Drillfloor / Derrick. Ran Casing to 9375 ft (7 in OD). Circulated at 9375 ft. Pumped spacers - volume 70 bbl. Mixed and pumped slurry - 160 bbl. Mixed and pumped slurry- 32 bbl. Displaced slurry- 335 bbl. Rigged down Casing handling equipment. Installed Seal assembly. Bullhead well. Held safety meeting. Tested BOP stack. Made up BHA no. 10. Singled in drill pipe to 3000 ft. Apr 20 1996 (1) Singled in drill pipe to 8943 ft. Drilled cement to 9247 ft. Circulated at 9247 ft. Tested Casing - Via annulus and string. Held drill (Kick while drilling). Drilled cement to 9385 ft. Drilled to 9395 ft. Circulated at %s. Apr 21 1996 (2) Circulated at 9395 ft. Drilled to 9652 ft. Pulled out of hole to %s. Pulled BHA. Made up BHA no. %s. R.I.H. to %s. Serviced %s. R.I.H. to %s. Drilled to %s. Apr 22 1996 (3) Drilled to 9980 ft. Circulated at 9980 ft. Pulled out of hole to 9380 ft. Rest hole at 9380 ft. R.I.H. to %s. Drilled to %s. Circulated at %s. Pulled out of hole to %s. Pulled BHA. Made up BHA no. %s. Apr 23 1996 (4) R.I.H. to 10082 ft. Drilled to 10194 ft. Circulated at 10194 ft. Pulled out of hole to 8375 ft. Circulated at 8375 ft. R.I.H. to 10194 ft. Drilled to 10348 ft. Rest hole at %s. Drilled to %s. Page Operations Summary for: ,.,-42 Apr 24 1996 (5) Circulated at 10692 ft. Pulled out of hole to 9375 ft. Rest hole at 9375 ft. Pulled out of hole to 8050 ft. Flow check. Circulated at 8050 ft. Rest hole at 8050 ft. R.I.H. to 9000 ft. Circulated at 9000 ft. R.I.H. to %s. Circulated at %s. R.I.H. to %s. Circulated at %s. Pulled out of hole to %s. Rest hole at %s. Circulated at %s. R.I.H. to %s. .Apr 25 1996 (6) Circulated at 10183 ft. R.I.H. to 10627 ft. Circulated at 10627 ft. Washed to 10692 ft. Pulled out of hole to 9375 ft. Rest hole at 9375 ft. R.I.H. to 10692 ft. Circulated at 10692 ft. Circulated at 10692 ft. Flow check. Pulled out of hole to %s. Pulled BHA. Rigged up %s. Held safety meeting. Ran %s to %s (%s OD). Ran %s in stands to %s. Apr 26 1996 (7) Ran Casing in stands to 10692 ft. Circulated at 10692 ft. Held safety meeting. Circulated at 10692 ft. Pumped spacers - volume 70 bbl. Mixed and pumped slurry - 36 bbl. Displaced slurry - 81 bbl. Set Liner hanger at 9225 ft with 1200 psi. Rigged down Cement unit. Pulled Drillpipe in stands to 8000 ft. Serviced Block line. Pulled Drillpipe in stands to 5000 ft. Made up BHA no. %s. R.I.H. to %s. Circulated at %s. Circulated at %s. Apr 27 1996 (8) Circulated at 10636 ft. Pulled out of hole to 1800 ft. Pulled BHA. Serviced Drillfloor / Derrick. Held safety meeting. Made up BHA no. 5. R.I.H. to 10530 ft. Functioned downhole tools at %s. Rest hole at %s. Laid down %s of %s OD drill pipe. Pulled BHA. Apr 28 1996 (9) Pulled BHA. Serviced Drillfloor / Derrick. Removed Bore protector. Held safety meeting. Rigged up Tubing handling equipment. Ran Tubing to 6700 ft (4.5 in OD). Ran %s to %s (%s OD). Circulated at %s. Ran %s on landing string to %s. Set packer at %s with %s. Apr 29 1996 (10) Set packer at 9091 ft with 4000 psi. Serviced Drillfloor / Derrick. Held safety meeting. Rigged down All functions. Held safety meeting. Installed All tree valves. Removed Hanger plug. Freeze protect well - 73 bbl of Diesel. Rigged down Drillfloor / Derrick. Page 4 SPEller-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLING PBU/S-42P~B~ ~ 50029226627~%~ NORTH SLOPE BOROUGH COMPUTATION DATE: 4/25/96 696 ! MWD SURVEY JOB NUMBER: AK-MW-60039 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. .00 .00 -71.79 0 0 211.40 211.40 139.61 0 24 300.40 300.39 228.60 1 12 391.42 391.38 319.59 1 42 481.40 481.28 409.49 2 47 N .00 E .00 .00N .00E S 77.20 W .19 .16S .72W N 89.60 W .92 .23S 1.95W N 86.70 W .55 .14S 4.26W N 89.50 W 1.23 .05S 7.79W .00 .30 .61 .99 1.59 571.40 571.15 499.36 3 24 661.99 661.57 589.78 3 42 748.87 748.30 676.51 3 0 842.65 841.98 770.19 2 5 936.59 935.87 864.08 1 47 N 89.20 W .67 .01N 12.65W N 85.80 W .40 .26N 18.25W N 83.60 W .82 .72N 23.31W N 79.10 W .98 1.32N 27.43W N 67.30 W .53 2.21N 30.49W 2.51 3.38 3.93 4.17 3.90 1032.54 1031.76 959.97 2 5 1127.78 1126.94 1055.15 1 47 1221.56 1220.69 1148.90 1 6 1316.09 1315.21 1243.42 0 42 1411.11 1410.23 1338.44 0 24 N 72.20 W .36 3.33N 33.55W N 69.10 W .33 4.40N 36.61W N 67.20 W .75 5.27N 38.81W N 61.00 W .43 5.91N 40.16W S 61.90 E 1.16 6.03N 40.37W 3.41 2.97 2.56 2.20 2.12 1505.12 1504.23 1432.44 1600.10 1599.20 1527.41 1694.82 1693.91 1622.12 1789.63 1788.71 1716.92 1887.46 1886.53 1814.74 1 0 0 47 0 36 0 54 0 54 S 67.00 E .64 5.56N 39.33W S 74.20 E .25 5.05N 37.93W S 75.60 E .20 4.75N 36.82W S 72.80 E .32 4.41N 35.63W S 66.30 E .11 3.87N 34.19W 2.38 2.60 2.67 2.77 3.01 1982.12 1981.18 1909.39 2078.47 2077.51 2005.72 2175.29 2174.32 2102.53 2268.65 2267.67 2195.88 2364.70 2363.71 2291.92 0 54 1 0 1 0 0 42 0 24 S 68.90 E .05 3.31N 32.82W S 67.70 E .11 2.72N 31.34W S 78.00 E .19 2.22N 29.73W S 46.20 E .59 1.66N 28.52W S 33.90 E .33 .97N 27.91W 3.29 3.58 3.74 4.05 4.60 2460.77 2459.78 2387.99 2557.01 2556.02 2484.23 2652.31 2651.31 2579.52 2747.68 2746.68 2674.89 2842.41 2841.40 2769.61 0 36 0 24 0 36 0 36 0 36 S 39.20 E .21 .30N 27.40W S 19.00 E .27 .41S 26.98W S 9.70 E .23 1.21S 26.78W S 11.80 E .02 2.19S 26.60W S 7.50 E .05 3.17S 26.43W 5.16 5.77 6.52 7.44 8.37 2935.81 2934.80 2863.01 3003.17 3002.15 2930.36 3091.78 3090.75 3018.96 3122.12 3121.09 3049.30 3218.12 3217.08 3145.29 0 42 0 42 1 0 0 48 0 54 S 9.70 E .11 4.22S 26.27W S 8.70 E .00 5.03S 26.14W S 1.10 W .37 6.34S 26.07W S 4.00 W .67 6.81S 26.09W S 13.80 W .18 8.21S 26.32W 9.36 10.13 11.40 11.87 13.29 SPEI~-~-SUN DRILLING SERVICES ANCHOR3~GE ALASKA PAGE sHARED SERVICES DRILLING PBU/S-42PB1 500292266270 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/25/96 DATE OF SURVEY: 041696 MWD SURVEY JOB NUMBER: AK-MW-60039 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 3310.84 3309.77 3237.98 3406.85 3405.56 3333.77 3501.49 3499.67 3427.88 3596.43 3593.93 3522.14 3690.84 3687.44 3615.65 COURS INCLN DG MN 1 42 5 48 6 18 7 24 8 23 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST S 48.50 E 1.63 9.83S 25.46W S 80.80 E 4.64 11.55S 19.61W S 80.40 E .53 13.18S 9.76W N 86.70 E 1.99 13.70S 1.48E S 88.20 E 1.29 13.57S 14.44E VERT. SECT. 14.70 15.22 14.86 13.13 10.42 3786.69 3782.05 3710.26 3882.84 3876.28 3804.49 3977.33 3967.96 3896.17 4072.26 4058.85 3987.06 4167.45 4147.94 4076.15 10 0 12 53 15 0 18 30 22 42 S 85.70 E 1.72 14.41S 29.73E S 84.10 E 3.03 16.14S 48.74E S 82.00 E 2.29 18.93S 71.34E S 81.60 E 3.69 22.84S 98.41E S 85.30 E 4.62 26.55S 131.67E 8.20 6.12 4.35 2.79 -.19 4262.92 4234.15 4162.36 4358.91 4317.01 4245.22 4455.44 4398.56 4326.77 4549.95 4477.86 4406.07 4645.81 4556.56 4484.77 28 6 32 30 32 12 33 42 35 54 S 89.00 E 5.89 28.45S 172.55E S 87.20 E 4.68 30.11S 220.93E S 85.80 E .84 33.26S 272.48E S 86.70 E 1.67 36.61S 323.77E S 85.30 E 2.44 40.45S 378.33E -6.46 -14.46 -21.64 -28.56 -35.66 4742.07 4634.09 4562.30 4835.84 4708.78 4636.99 4933.18 4784.53 4712.74 5018.48 4847.04 4775.25 5037.73 4860.41 4788.62 36 47 37 35 40 12 45 30 46 30 S 84.00 E 1.23 45.77S 435.13E S 81.90 E 1.60 52.74S 491.38E S 81.20 E 2.71 61.73S 551.84E S 81.00 E 6.22 70.71S 609.13E S 80.00 E 6.40 72.99S 622.79E -41.75 -46.11 -49.33 -51.94 -52.42 5134.28 4924.38 4852.58 5228.41 4983.55 4911.76 5323.76 5042.97 4971.18 5419.59 5104.30 5032.51 5515.12 5168.46 5096.67 50 30 51 35 51 17 49 5 46 30 S 80.20 E 4.15 85.42S 694.01E S 80.01 E 1.18 98.00S 766.12E S 80.20 E .35 110.81S 839.58E S 80.10 E 2.30 123.41S 912.11E S 81.10 E 2.83 134.98S 981.91E -54.41 -56.44 -58.50 -60.60 -63.15 5610.63 5235.93 5164.14 5706.12 5306.78 5234.99 5801.75 5381.04 5309.25 5897.33 5458.00 5386.21 5993.94 5537.38 5465.59 43 40 37 35 34 35 35 30 12 17 S 82.30 E 3.16 144.75S 1048.79E S 82.60 E 3.15 153.16S 1112.25E S 83.70 E 3.32 160.37S 1172.05E S 83.90 E 2.41 166.49S 1228.36E S 84.90 E 1.10 171.87S 1283.16E -66.88 -71.26 -76.11 -81.32 -86.95 6089.70 5617.68 5545.89 6185.37 5700.44 5628.65 6280.51 5785.39 5713.60 6374.66 5871.69 5799.90 6470.17 5961.14 5889.35 31 42 28 30 25 0 22 6 18 53 S 86.00 E 2.79 176.02S 1335.14E S 86.20 E 3.35 179.29S 1383.00E S 86.80 E 3.69 181.92S 1425.74E S 85.60 E 3.12 184.39S 1463.27E S 84.30 E 3.38 187.30S 1496.58E -93.23 -99.55 -105.48 -110.53 -114.30 SPERP--~-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/S-42PB1 500292266270 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/25/96 DATE OF SURVEY: 041696 MWD SURVEY JOB NUMBER: AK-MW-60039 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 6565.89 6052.68 5980.89 6661.00 6145.30 6073.51 6756.39 6239.22 6167.43 6851.89 6333.92 6262.13 6946.43 6428.15 6356.36 COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 15 0 S 82.70 E 4.10 190.42S 1524.31E 11 11 S 82.00 E 4.00 193.27S 1545.67E 8 48 S 81.80 E 2.52 195.60S 1562.07E 6 0 S 76.40 E 3.02 197.81S 1574.15E 3 0 S 79.30 E 3.18 199.43S 1581.39E VERT. SECT. -116.77 -118.23 -119.21 -119.44 -119.29 7041.93 6523.58 6451.79 7137.53 6619.17 6547.38 7233.49 6715.12 6643.33 7329.32 6810.93 6739.14 7371.65 6853.25 6781.46 0 54 S 60.10 E 2.27 200.27S 1584.49E 0 36 S 81.20 E .42 200.72S 1585.64E 1 6 N 74.10 E .63 200.55S 1587.02E 1 17 N 74.70 E .21 200.01S 1588.95E 0 54 N 71.10 E .96 199.77S 1589.73E -119.09 -118.88 -119.32 -120.24 -120.62 7455.54 6937.13 6865.34 7551.09 7032.66 6960.87 7647.52 7129.07 7057.28 7743.21 7224.75 7152.96 7839.67 7321.21 7249.42 1 6 N 75.00 E .25 199.35S 1591.13E 1 6 N 81.10 E .12 198.97S 1592.92E 1 12 N 86.30 E .15 198.76S 1594.85E 0 24 S 22.60 E 1.19 199.01S 1595.97E 0 18 S 7.20 E .14 199.57S 1596.13E -121.31 -122.04 -122.63 -122.61 -122.09 7936.17 7417.71 7345.92 8027.91 7509.45 7437.66 8124.86 7606.39 7534.60 8218.06 7699.58 7627.79 8315.01 7796.53 7724.74 0 24 S 10.60 E .11 200.15S 1596.23E 0 30 S 21.90 E .15 200.84S 1596.44E 0 36 S 32.80 E .15 201.66S 1596.87E 0 30 S 39.60 E .13 202.38S 1597.39E 0 24 N 82.70 E .46 202.66S 1598.00E -121.54 -120.91 -120.20 -119.59 -119.43 8409.93 7891.45 7819.66 8506.53 7988.04 7916.25 8601.18 8082.68 8010.89 8697.14 8178.63 8106.84 8781.80 8263.29 8191.50 0 36 N 66.20 E .26 202.42S 1598.78E 0 48 N 52.60 E .27 201.81S 1599.78E 0 54 N 60.00 E .16 201.03S 1600.95E 0 42 N 58.90 E .21 200.35S 1602.10E 0 18 N 72.30 E .49 200.02S 1602.76E -119.83 -120.63 -121.62 -122.51 -122.97 8845.30 8326.79 8255.00 8876.79 8358.26 8286.47 8908.34 8389.72 8317.93 8941.15 8422.21 8350.42 8973.21 8453.51 8381.72 0 30 S 17.20 W 1.13 200.23S 1602.83E 2 35 S 52.50 W 7.02 200.80S 1602.23E 5 48 S 59.60 W 10.26 202.04S 1600.28E 10 6 S 63.50 W 13.20 204.17S 1596.28E 14 48 S 66.10 W 14.76 207.08S 1590.01E -122.78 -122.10 -120.50 -117.62 -113.52 9003.88 8482.83 8411. 9036.32 8513.17 8441. 9067.90 8542.33 8470. 9099.39 8571.07 8499. 9130.90 8599.12 8527. 04 19 12 S 66.40 W 14.35 38 22 12 S 66.80 W 9.26 54 23 0 S 69.50 W 4.15 28 25 12 S 69.30 W 6.99 33 28 53 S 70.00 W 11.79 210.69S 1581.81E 215.24S 1571.28E 219.75S 1560.02E 224.27S 1547.99E 229.25S 1534.55E -108.35 -101.79 -95.13 -88.30 -80.75 RECEIVED JUN 0 3 1996 Al~mk4 0tl & O~ms Cons. Commission SPE~m~¥-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU/S-42PB1 500292266270 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/25/96 DATE OF SURVEY: 041696 MWD SURVEY JOB NUMBER: AK-MW-60039 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9162.00 8625.89 8554.10 32 17 S 69.80 W 10.94 234.695 1519.69E 9193.78 8652.22 8580.43 35 47 S 71.50 W 11.41 240.585 1502.90E 9226.27 8678.01 8606.22 39 5 S 72.80 W 10.44 246.625 1484.10E 9257.90 8701.95 8630.16 42 30 S 72.90 W 10.75 252.725 1464.35E 9290.03 8724.88 8653.09 46 24 S 72.70 W 12.15 259.375 1442.86E -72.46 -63.35 -53.68 -43.78 -32.99 9321.87 8746.08 8674.29 50 5 S 71.00 W 12.28 266.785 1420.30E 9353.49 8765.78 8693.99 52 47 S 70.50 W 8.63 274.935 1396.95E 9383.64 8783.22 8711.43 56 30 S 69.80 W 12.42 283.285 1373.83E 9415.44 8799.95 8728.16 60 0 S 70.10 W 11.04 292.555 1348.43E 9449.80 8816.40 8744.61 62 47 S 71.30 W 8.71 302.525 1319.96E -21.24 -8.60 4.19 18.33 33.76 9481.49 8830.24 8758.45 65 24 S 71.20 W 8.21 311.685 1292.97E 9513.97 8843.19 8771.40 67 35 S 70.30 W 7.23 321.505 1264.85E 9545.46 8854.17 8782.38 71 35 S 69.80 W 12.79 331.575 1237.12E 9575.64 8862.68 8790.89 75 35 S 69.50 W 13.29 341.645 1209.98E 9607.55 8869.32 8797.53 80 24 S 68.80 W 15.19 352.745 1180.82E 48.11 63.33 78.72 93.98 110.67 9639.50 8873.76 8801.97 83 35 S 69.70 W 10.40 363.955 1151.23E 9671.95 8877.24 8805.45 84 5 S 69.80 W 1.57 375.125 1120.97E 9704.22 8880.42 8808.63 84 35 S 69.10 W 2.66 386.395 1090.90E 9736.64 8883.92 8812.13 83 0 S 68.10 W 5.81 398.155 1060.89E 9767.85 8888.50 8816.71 80 5 S 68.50 W 9.38 409.565 1032.21E 127.54 144.51 161.54 179.04 195.93 9800.15 8894.69 8822.90 77 48 S 68.50 W 7.12 421.185 1002.72E 9831.21 8901.97 8830.18 75 5 S 68.90 W 8.78 432.155 974.59E 9862.69 8910.80 8839.01 72 18 S 69.80 W 9.31 442.805 946.32E 9894.31 8921.18 8849.39 69 24 S 69.60 W 9.19 453.165 918.31E 9926.16 8932.98 8861.19 67 5 S 69.80 W 7.24 463.425 890.57E 213.18 229.53 245.60 261.33 276.91 9954.18 8944.48 8872.69 64 24 S 70.70 W 10.07 472.065 866.53E 9985.53 8958.81 8887.02 61 12 S 71.00 W 10.24 481.215 840.19E 10024.57 8978.57 8906.78 58 0 S 73.20 W 9.53 491.565 808.16E 10056.67 8996.17 8924.38 55 30 S 71.60 W 8.83 499.675 782.58E 10088.83 9014.91 8943.12 53 12 S 72.50 W 7.50 507.735 757.72E 290.15 304.36 320.88 333.92 346.76 10121.02 9034.75 8962.96 50 42 S 74.70 W 9.45 514.89S 733.41E 10152.55 9055.14 8983.35 48 42 S 73.70 W 6.79 521.43S 710.28E 10185.27 9076.90 9005.11 47 54 S 71.50 W 5.58 528.74S 686.97E 10261.00 9127.67 9055.88 47 54 S 71.50 W .03 546.57S 633.68E 358.62 369.64 381.43 409.51 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 836.83 FEET AT SOUTH 49 DEG. 13 MIN. EAST AT MD = 10261 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 191.48 DEG. RECEIVED JUN 0 3 199G 01t ~ ~mi Oon~. ~mmi~ion Anchorage SPER.~-~-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/S-42PB1 500292266270 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/25/96 DATE OF SURVEY: 041696 JOB NUMBER: AK-MW-60039 KELLY BUSHING ELEV. = 71.79 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -71.79 .00 N .00 E 1000.00 999.24 927.45 2.97 N 32.41 W 2000.00 1999.05 1927.26 3.21 N 32.56 W 3000.00 2998.98 2927.19 4.99 S 26.15 W 4000.00 3989.82 3918.03 19.77 S 77.31 E .00 .76 .76 .95 .19 1.02 .07 10.18 9.16 5000.00 4833.96 4762.17 68.67 S 596.24 E 6000.00 5542.39 5470.60 172.17 S 1286.55 E 7000.00 6481.66 6409.87 199.94 S 1583.92 E 8000.00 7481.54 7409.75 200.61 S 1596.35 E 9000.00 8479.16 8407.37 210.18 S 1582.96 E 166.04 155.86 457.61 291.57 518.34 60.73 518.46 .12 520.84 2.38 10000.00 8965.91 8894.12 485.23 S 828.25 E 10261.00 9127.67 9055.88 546.57 S 633.68 E 1034.09 513.25 1133.33 99.24 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. RECEIVED JUN 0:5 1991; Ala,kll 011 & (~;~ Co~;. Commi~io~ Anchorage SPEI~J~¥-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 SHAREID SERVICES DRILLING PBU/S-42PB1 500292266270 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/25/96 DATE OF SURVEY: 041696 JOB NUMBER: AK-MW-60039 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -71.79 71.79 71.79 .00 171.79 171.79 100.00 271.80 271.79 200.00 371.82 371.79 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .10 S .45 W .00 .00 .23 S 1.36 W .01 .01 .17 S 3.68 W .03 .03 471.90 471.79 400.00 572.04 571.79 500.00 672.24 671.79 600.00 772.40 771.79 700.00 872.48 871.79 800.00 .05 S 7.32 .01 N 12.69 .31 N 18.91 .86 N 24.53 1.53 N 28.51 W .11 .07 W .25 .15 W .45 .19 W .61 .16 W .69 .08 972.53 971.79 900.00 1072.60 1071.79 1000.00 1172.65 1171.79 1100.00 1272.67 1271.79 1200.00 1372.67 1371.79 1300.00 2.65 N 31.53 3.78 N 34.95 4.89 N 37.89 5.64 N 39.67 6.15 N 40.59 W .74 .05 W .81 .06 W .86 .05 W .88 .02 W .88 .01 1472.68 1471.79 1400.00 1572.69 1571.79 1500.00 1672.70 1671.79 1600.00 1772.71 1771.79 1700.00 1872.72 1871.79 1800.00 5.78 N 39.85 5.16 N 38.30 4.81 N 37.05 4.49 N 35.89 3.97 N 34.41 W .89 .00 W .90 .01 W .91 .01 W .92 .01 W .93 .01 1972.73 1971.79 1900.00 2072.75 2071.79 2000.00 2172.76 2171.79 2100.00 2272.77 2271.79 2200.00 2372.78 2371.79 2300.00 3.36 N 32.96 2 . 75 N 31.43 2.23 N 29.77 1.62 N 28.48 .92 N 27.88 W .94 .01 W .96 .01 W .97 .01 W .98 .01 W .99 .01 2472.78 2471.79 2400.00 2572.78 2571.79 2500.00 2672.79 2671.79 2600.00 2772.79 2771.79 2700.00 2872.80 2871.79 2800.00 .21 N 27.33 .51 S 26.94 1.42 S 26.75 2.45 S 26.54 3.49 S 26.39 W .99 .00 W 1.00 .00 W 1.00 .00 W 1.00 .00 W 1.01 .01 2972.81 2971.79 2900.00 3072.82 3071.79 3000.00 3172.83 3171.79 3100.00 3272.84 3271.79 3200.00 3372.95 3371.79 3300.00 4 . 66 S 26.20 6.01 S 26.07 7.53 S 26.16 9.09 S 26.27 10.98 S 22.49 W 1.02 .01 W 1.03 .01 W 1.04 .01 W 1.05 .02 W 1.16 . 11 SPERm~¥-SUN DRILLING SERVICES ANCHORAGE ALASKA ..... PAGE SHARED SERVICES DRILLING PBU/S-42PB1 50o292266270 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/25/96 DATE OF SURVEY: 041696 JOB NUMBER: AK-MW-60039 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTAi~GULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3473.44 3471.79 3400.00 3574.10 3571.79 3500.00 3675.02 3671.79 3600.00 3776.27 3771.79 3700.00 3878.24 3871.79 3800.00 12.67 S 12.80 13.87 S 1.40 13.49 S 12.13 14.28 S 27.93 16.04 S 47.73 W 1.65 .49 W 2.31 .67 E 3.23 .92 E 4.48 1.25 E 6.45 1.97 3981.29 3971.79 3900.00 4085.94 4071.79 4000.00 4193.46 4171.79 4100.00 4306.01 4271.79 4200.00 4423.80 4371.79 4300.00 19.07 S 72.37 23.45 S 102.81 27.28 S 142.03 28.99 S 193.51 32.02 S 255.67 9.50 3.05 14.15 4.64 21.67 7.53 34.22 12.54 52.01 17.80 4542.65 4471.79 4400.00 4664.61 4571.79 4500.00 4789.21 4671.79 4600.00 4916.57 4771.79 4700.00 5054.40 4871.79 4800.00 36.38 S 319.73 41.35 S 389.32 48.84 S 463.26 60.11 S 541.30 75.10 S 634.78 E 70.86 18.85 E 92.82 21.96 E 117.42 24.60 E 144.78 27.36 E 182.61 37.83 5209.48 4971.79 4900.00 5369.67 5071.79 5000.00 5519.95 5171.79 5100.00 5659.52 5271.79 5200.00 5790.05 5371.79 5300.00 95.43 S 751.51 116.90 S 874.79 135.51 S 985.37 149.16 S 1081.73 159.57 S 1164.92 E 237.69 55.09 E 297.88 60.19 E 348.16 50.28 E 387.73 39.58 E 418.26 30.52 5914.21 5471.79 5400.00 6035.31 5571.79 5500.00 6152.58 5671.79 5600.00 6265.46 5771.79 5700.00 6374.76 5871.79 5800.00 167.52 S 1238.03 173.81 S 1306.04 178.22 S 1367.10 181.55 S 1419.30 184.39 S 1463.29 E 442.42 24.16 E 463.52 21.11 E 480.79 17.27 E 493.67 12.88 E 502.97 9.30 6481.41 5971.79 5900.00 6585.63 6071.79 6000.00 6688.00 6171.79 6100.00 6789.30 6271.79 6200.00 6889.93 6371.79 6300.00 187.66 S 1500.16 191.05 S 1529.22 194.00 S 1550.86 196.33 S 1566.74 198.63 S 1577.61 E 509.62 6.65 E 513.84 4.22 E 516.21 2.38 E 517.51 1.30 E 518.14 .63 6990.12 6471.79 6400.00 7090.14 6571.79 6500.00 7190.15 6671.79 6600.00 7290.17 6771.79 6700.00 7390.19 6871.79 6800.00 199.85 S 1583.52 200.62 S 1585.13 200.76 S 1586.24 200.24 S 1588.10 199.68 S 1590.01 518.33 518.35 518.36 518.38 518.40 .19 .02 .01 .02 .02 RECEIVED 1996 SPER!LY,-SUN DRILLING SERVICES ANCHOR31GE ALASKA PAGE SHARED-SERVICES DRILLING PBU/S-42PB1 500292266270 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/25/96 DATE OF SURVEY: 041696 JOB NUMBER: AK-MW-60039 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7490.21 6971.79 6900.00 199.18 S 1591.77 E 518.42 .02 7590.22 7071.79 7000.00 198.86 S 1593.67 E 518.43 .02 7690.25 7171.79 7100.00 198.73 S 1595.70 E 518.46 .02 7790.25 7271.79 7200.00 199.31 S 1596.09 E 518.46 .00 7890.25 7371.79 7300.00 199.84 S 1596.17 E 518.46 .00 7990.25 7471.79 7400.00 200.53 S 1596.32 E 518.46 .00 8090.26 7571.79 7500.00 201.35 S 1596.67 E 518.47 .00 8190.26 7671.79 7600.00 202.19 S 1597.24 E 518.47 .01 8290.27 7771.79 7700.00 202.68 S 1597.83 E 518.48 .00 8390.27 7871.79 7800.00 202.50 S 1598.59 E 518.48 .00 8490.28 7971.79 7900.00 201.94 S 1599.60 E 518.49 .01 8590.29 8071.79 8000.00 201.12 S 1600.80 E 518.50 .01 8690.30 8171.79 8100.00 200.40 S 1602.03 E 518.51 .01 8790.30 8271.79 8200.00 200.01 S 1602.80 E 518.51 .00 8890.35 8371.79 8300.00 201.28 S 1601.51 E 518.56 .05 8992.28 8471.79 8400.00 209.27 S 1585.05 E 520.49 1.94 9100.19 8571.79 8500.00 224.40 S 1547.66 E 528.40 7.91 9218.33 8671.79 8600.00 245.14 S 1488.81 E 546.54 18.13 9363.66 8771.79 8700.00 277.69 S 1389.23 E 591.87 45.33 9624.14 8871.79 8800.00 358.60 S 1165.49 E 752.35 160.48 10011.47 8971.79 8900.00 488.21 S 818.86 E 1039.68 287.33 10177.63 9071.79 9000.00 526.96 S 692.36 E 1105.84 66.16 10261.00 9127.67 9055.88 546.57 S 633.68 E 1133.33 27.49 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS RECEIVED JUN 0,~ 199(; Alaska 011 & Gas Cons. commissar' Anchorage SPE~KY-SUN DRILLING SERVICES ANCHORAGE ALASKA SHARED SERVICES DRILLING PBU/S-42 500292266200 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 PAGE 1 DATE OF SURVEY: 042396 ~/~f%q~'C/ MWD SURVEY · -~ JOB NUMBER: AK-MM-960416 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9324.91 8748.82 8677.03 9345.10 8762.76 8690.97 9377.07 8784.97 8713.18 9408.75 8806.08 8734.29 9440.73 8825.27 8753.48 46 29 46 12 45 44 50 42 55 30 S 73.60 W .00 267.20S 1418.51E S 73.87 W 1.69 271.29S 1404.49E S 73.73 W 1.50 277.70S 1382.41E S 73.81 W 15.66 284.30S 1359.74E S 73.88 W 15.04 291.42S 1335.18E 20.35 26.78 36.88 47.26 58.48 9472.19 8842.27 8770.48 9504.51 8857.57 8785.78 9535.93 8869.60 8797.81 9567.42 8877.97 8806.18 9592.76 8881.59 8809.80 59 64 70 78 84 2 26 30 39 55 S 73.95 W 11.22 298.75S 1309.75E S 74.56 W 16.82 306.47S 1282.36E S 70.30 W 22.96 315.25S 1254.72E S 69.40 W 26.06 325.70S 1226.25E S 69.60 W 24.72 334.48S 1202.77E 70.05 82.35 95.73 110.90 123.57 9631.01 8884.43 8812.64 9662.78 8886.58 8814.79 9693.68 8888.95 8817.16 9725.79 8891.74 8819.95 9757.62 8894.82 8823.03 86 34 85 40 85 31 84 30 84 24 S 66.35 W 9.51 348.78S 1167.41E S 68.01 W 5.93 361.07S 1138.20E S 63.45 W 14.72 373.73S ll10.12E S 66.91 W 11.19 387.16S 1081.09E S 63.24 W 11.48 400.51S 1052.37E 143.72 160.83 178.11 196.31 214.38 9788.35 8897.81 8826.02 9820.35 8901.04 8829.25 9852.73 8904.37 8832.58 9885.47 8907.63 8835.84 9916.54 8910.37 8838.58 84 25 84 0 84 11 84 21 85 31 S 68.06 W 15.61 413.11S 1024.51E S 63.56 W 14.05 426.16S 995.48E S 67.17 W 11.11 439.58S 966.21E S 67.23 W .52 452.20S 936.17E S 63.14 W 13.63 465.19S 908.09E 231.57 249.39 267.63 285.21 302.82 9948.36 8912.74 8840.95 9980.29 8914.94 8843.15 10012.36 8917.15 8845.36 10042.07 8919.13 8847.34 10074.50 8921.09 8849.30 85 57 86 8 85 57 86 23 86 40 S 65.75 W 8.30 478.88S 879.46E S 58.66 W 22.16 493.72S 851.30E S 59.86 W 3.77 510.07S 823.81E S 63.97 W 13.88 524.03S 797.66E S 59.96 W 12.37 539.24S 769.09E 321.20 340.65 361.47 379.69 399.57 10106.15 8922.88 8851.09 10139.70 8924.64 8852.85 10169.67 8926.27 8854.48 10201.42 8928.15 8856.36 10233.22 8930.18 8858.39 86 50 87 7 86 40 86 30 86 11 S 60.78 W 2.65 554.86S 741.63E S 62.74 W 5.89 570.71S 712.11E S 61.34 W 4.91 584.74S 685.68E S 61.67 W 1.15 599.86S 657.83E S 62.43 W 2.58 614.73S 629.80E 419.67 440.34 458.69 478.35 497.81 10264.70 8932.35 8860.56 10297.42 8934.74 8862.95 10328.56 8937.15 8865.36 10360.45 8939.71 8867.92 10392.48 8942.23 8870.44 85 53 85 42 85 25 85 22 85 35 S 61.53 W 3.02 629.49S 602.07E S 61.15 W 1.28 645.14S 573.44E S 60.78 W 1.49 660.21S 546.30E S 59.21 W 4.91 676.10S 518.77E S 57.11 W 6.57 692.94S 491.65E 517.09 537.41 556.91 577.28 598.52 RECEIVED JUN o SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/S-42 500292266200 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 DATE OF SURVEY: 042396 MWD SURVEY JOB NUMBER: AK-MM-960416 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT. 10422.08 8944.49 8872.70 85 39 S 61.19 W 13.75 708.07S 466.32E 10454.04 8946.83 8875.04 85 57 S 61.05 W 1.06 723.47S 438.41E 10486.10 8949.18 8877.39 85 37 S 60.06 W 3.26 739.19S 410.56E 10517.78 8951.66 8879.87 85 25 S 59.47 W 1.95 755.09S 383.28E 10549.60 8954.23 8882.44 85 16 S 62.26 W 8.75 770.53S 355.58E 617.76 637.71 657.96 678.30 698.26 10581.66 8956.86 8885.07 85 18 S 57.39 W 15.14 786.59S 327.96E 10612.21 8959.29 8887.50 85 34 S 61.23 W 12.56 802.13S 301.78E 10692.00 8965.44 8893.65 85 34 S 61.23 W .02 840.41S 232.05E 718.81 738.60 788.26 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 871.86 FEET AT SOUTH 15 DEG. 26 MIN. EAST AT MD = 10692 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 189.86 DEG. TIE IN POINT (PROVIDED BY ~LALLIBURTON) 9324.91' NO KICKOFF POINT AS SIDETRACKED UNINTENTIONALLY INTERPOLATED DEPTH 10692' SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/S-42 500292266200 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 DATE OF SURVEY: 042396 JOB NUMBER: AK-MM-960416 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLOP~ATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9324.91 8748.82 8677.03 10324.91 8936.86 8865.07 10692.00 8965.44 8893.65 267.20 S 1418.51 E 576.09 658.43 S 549.47 E 1388.05 811.96 840.41 S 232.05 E 1726.56 338.51 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. RECEIVED 011 & l~,; C~os;. Commissios ~chor;ge SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU/S-42 500292266200 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 DATE OF SURVEY: 042396 JOB NUMBER: AK-MM-960416 KELLY BUSHING ELEV. = 71.79 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9324.91 8748.82 8677.03 9358.13 8771.79 8700.00 9543.00 8871.79 8800.00 10692.00 8965.44 8893.65 267.20 S 1418.51 E 576.09 273.91 S 1395.46 E 586.34 10.25 317.54 S 1248.40 E 671.21 84.87 840.41 S 232.05 E 1726.56 1055.35 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Reference: S-42 PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE+LIS Date: RE: 23 April 1996 Transmittal of Data ECC #: 6645.00 Sent by: HAND CARRY Data: OH-LDWG Run # 1 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 563-7803 Received by: 07) LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 22 April 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION S-42 ~ 1 ZDL/CN FINAL BL+RF ~1 DIFL/MLL FINAL BL+RF /1 DAC FINAL BL+RF Jl BH PRO FINAL BL+RF f 1 SSVD FINAL BL+RF S-42 ~/1 FMT FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 6645.00 Run # 1 6645.01 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 ~ Or FAX to (907) 563-7803 Received by.~~/~'~~~ Date: .fi:BP EXPLORATION PE 4- 7-96 ;10:09Abl ; BPX PROI ~R-~ 76599.717;# 2/ 9. From: Date: ~ubj~t: To: Note'o? PBU-,Dd~g Fie, lO 8, up~ PBU-Drlg Field Supv Sun, Apr7, 1996 10:07 AM Divetxer Lines at Rigs END-Drill Rig 15; PBU-Drlg Rig 22E; PBU-Drlg-Rig 14; PBU-Drlg-Rig 16; PBU-Drlg~Rig 181:,:; PBU-Drlg-Rig 2'7E; PBU-Ddg-Rig 28E; PBU-Drig-Rig 2ES; PBU-Drlg4lig 4BS; PBU-Drlg-Rig 7; PBUq)rlg-Rig 9 ARCO-Beverly/Wangstrom; Beverly/Wangstmm PRB; PBU-Drlg Fi=Id Supv; PBU-Drlg HSE Coord An AOGCC Inspector has observed what he views as a serious safety problean as,sc~qatod with dtverter lines and towline tie-in crews on 2 separate wellpads. In one case, there were Tioga heaters set up -in the close vicinity of the end of the divert0r lin,: and in thc oflmr instance tl~ towline cr~w wea-e working near the end of the diverter line. The ins'pemtor informed me that in both cases, the constn, ction crew had no idea of what the ali.verier line was for and no m~derstanding (ff the potential dangers aamciated with working near it. · The divcrter line is ther~ to divert gas away frmn the rig in the event that tim rig emcounte~ slndlow gas while drilling surface hole. As such, it is not acceptable to have any personnel working within 50' eft the end of the diverter line. It is totally unacceptable to have pottmtial ignition sources within 10ft of tht; end of the diverter line i.e Tioga heaters. · It is the responsibility of both the Drilling Representative and the Construction Foreman to meet daily or as required to discuss ongoing operations mid mutually identify any hazards a.~soeiatrat with same. · All rigs need to ensure that no oumide operations take place in the vicinity of ~my potential sources of hydrocarbon diseharg~ and that all sources m~ clearly i~nfified to other groups working on the pad in the vicinity of the rig or associated equipment. · It is the responsibility of construction crews and others working in the vicinity of rigs to api~ise themselves by talking to the Drilling mpresentatiw of any potential hazards in their work area and to revtew their operations aco~xrdingly. * The Drilling depamnent will take steps m provick; clear identification (ff any potential hav~rds that exist around the rig for OtherS working on the wellpad. I recommend that h~ the ca,,~e of the diverter line, an exclusion zone b~ set up with barriers around thc end of any gas diverter linc to prevent any operations or ignition ~utt:es within 10ft of the and of the lines. In addition, the line should be identified as a source of sudden gas or hydrocarbon All rigs shotfld hnmedia~ly rake action to ensure that no similar situatiolta exist on their l(x:afions smd that the potential haz;tnl.,; of simultaneous opexafions am closely scrutinized. Constr~Mon crews a~ reque.~ted and expected to fully discuss their scope of work and ide, tify all hazards in th.~qr work area with the Drilling representative on a daily basis or as dictatext by operational requirements. Tom Manix/Mik~ Peters, pl~.m make this a part of your rig inspections in futura to 'cheek that aimultaneouS operations are b~ing conducted in a safe manner by all patties involvt'~. The AOOCC Inspector infi'mnud me that futu~ inffingomont8 of this type would re,quit in shutting down drilling and ¢onsmmtion opemtlons until the situation was rectified. If you have any comments, ttuestion~ or concerns please cml me at 659-4653. I. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: David John,~,~ Chairma~ Blair Wondzell, P. I. Supervisor.~ FROM: Doug Amos, ~,~ ~n,,,,[_ SUBJECT: Petroleum Inspector  o~ DATE: FILE NO: April 5, 1996 eirhdedd.doc Diverter System Nabors 28E BPX PBU S-42 Prudhoe Oil Pool PTD No. 96-0054 Friday, April 5, 1996: I traveled to BPX PBU S-42 well to inspect the Diverter System on Nabors Rig No. 28E. Due to work schedule conflicts I was unable to attend the initial Diverter function test on 4/4/96. When i arrived on location i found the rig and diverter system in good condition. Nabors has installed a new diverter system consisting of a MSP 21 1/4" 2000~ Annular Preventer with a single straight 16" Vent Line and 16" F/O Knife Valve. This system is a marked improvement over the 10 314" bifurcated system, in that it offers no restriction and few points for possible component erosion during divert operations. As the attached AOGCC Diverter System Inspection Form indicates the vent line is short (40' +/,-), this arrangement was unavoidable due to the location of the Flowlines directly behind the rig. I found a number of serious non compliance items during my inspection. There were no warning signs posted at or near the terminus of the 16" vent line, there were Norcon construction personnel working in front and in close proximity to the end of the vent line. In addition there were two open flame type space heaters within 20' +/- of the vent line terminus. I immediately brought these items to the attention of Nabors representative, Mike Downey and BPX representative, Charlie Dixion. Mike Downey assured me that signs would be made up and posted and Charlie Dixon contacted the Norcon construction supervisor and instructed him to suspend the flowline installation operations. I traveled back to the rig to verified that the non compliance item had indeed been corrected. While there I talked to the Norcon construction supervisor and was alarmed to find out the he had no idea that the rig could vent gas from the wellbore, through the vent line without notice. I instructed him to be sure and coordinate his construction operations with the rig supervisor in the future. Saturday, April 6, 1996: While conducting a diverter inspection at BPX MPU J- Pad and finding no warning signs on Nabors Rig 27E diverter system, ! decided to discuss this problem with BPX Shared Services Drilling Superintendent, Dick Maschell. Sunday, April 7, 1996: i met with Dick and told him about my observation. I informed him that in the future this situation would result in the shutting down of drilling operations, until the non compliance items are rectified. Dick seemed surprised and assured me that he would immediately inform the drilling supervisor's on all rigs, via E-Mail, of these serious problems. Emphasizing the need for direct communication between the construction supervisors and drilling supervisors any time there are similar simultaneous operation occurring with a Diverter System deployed. A copy of this E-Mail message is attached for reference. SUMMARY: I inspected the Diverter System on Nabors Rig 28E at BPX PBU S- 42 well. Non compliance items discovered were corrected and arrangements made to ensure future compliance. Attachment: EIRHDEDD.XLS, BPX E-MAIL MESSAGE CONSERVATION COMMISSION March 13, 1996 TONY KNOWLE$, GOVEBNOI~ 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Dan Stoltz, Sr. Drlg. Eng. BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Prudhoe Bay Unit S-42 BP Exploration (Alaska), Inc. Permit No: 96-54 Sur. Loc. 4181'NSL, 4503'WEL, Sec. 35, T12N, R12E, UM Btmhole Loc. 2219'NSL, 4716'WEL, Sec. 35, T12N, R12E, UM Dear Mr. Stoltz: Enclosed is the approved application for permit to redrill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by 1aw from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. In compliance with 20 AAC 25.080, your request for annular disposal is approved. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. J. David Norton, P.E. Commissioner BY ORDER OF THE COMMISSION dlf/Enclosures CC; Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-I lb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration Plan RTE = 70.9 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028257 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 4181' NSL, 4503' WEL, SEC. 35, T12N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 3643' NSL, 3624' WEL, SEC. 35, T12N, R12E S-42 2S100302630-277 At total depth 9. Approximate spud date Amount 2219' NSL, 4716' WEL, SEC. 35, T12N, R12E 03/12/96 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 028258 564 feet No Close Approach feet 2560 11053' MD/8874' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 3300 feet Maximum hole angle 9o o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' 30' 110' 110' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-Mod 3071' 37' 37' 3071' 3071' 1002 sx CS, 305 sx 'G' 8-1/2" 7" 26/29# i-8o/13Cr BTC-Mod 9703' 37' 37' 9703' 8857' 279 SX Class 'G', 150 sx Class G' 6" 4-1/2" 12.6# 13-Cr NSCC 1500' 9553' 8830' 11053' 8874' 194 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural ~:.~..:_,.,-.., ~ ,..~., .~,¢-~ .... Conductor '~ ~,,~,--~ ~ i'; ,¥ ~.,.=, .~ Surface Intermediate Production M/1~ 0 ] Liner Ai,-2S!.:~ ()ii & L~3~s Con~, Perforation depth: measured true vertical L~-~-~'~OA.5- ~'o~Jro, z-~ "r~ [~,~5(~ ~foel-q$15 20. Attachments Filing fee ~ Properly plat ~ BOP Sketch ~ Diverter Sketch ~ Drilling program ~ Dr ing f uid program ~ Time vs depth plot ~ Refraction analysis~ Seabed repod~ 20 AAC 25.050 requirements~ 21. I hereby ce¢~ that t~ is true and correct to the best of my knowledge Signed ~¢¢¢.~ Title SeniorDrillin~ Enceer Date 7 Commission Use Only Permit Number APl number Approval dat9 See cover letter ?~--~:~ 50- O~¢- ~ Z ~~ ¢//~/~ ~ for other requ rements Conditions of approval Samples required ~ Yes ~ Mud Icg required ~Yes ~ ~ Hydrogen sulfide measures ~ Yes ~ ~ Directional survey required ~ Yes ~ ~ Required working pressure for ~61~~E~; ~SM; ~10M; ~15M; Other: ~.~N~,P. ~/ by order of _/~ Approved by Commissioner me commission Date Form 10-401 Rev. 12-1-85 Submit in trii~licate I Well Name: IS-42 Well Plan Summary Type of Well (producer or injector): I Producer Surface Location: 4,181' FSL 4,503' FEL Sec 35 T12N R12E Pilot Hole Bottom Hole Location: 3,598' FSL 3,897' FEL Sec. 35 T12N R12E Start of Horizontal Location: End of Horizontal Location: 2,219' FSL 4,716' FEL Sec 35 T12N R12E Start of Horizontal Location: End of Horizontal Location: Sadlerochit Zone 4 (lower) Lateral 3,643' FSL 3,624' FEL Sec 35 T12N R12E Sag River (upper) Lateral Not applicable Not applicable I AFE Number: I 4P0754 I I Rig: I Nabors 28-E I Estimated Start Date: I Mar. 12, 1996 I I Operating days to complete: I 25 IKBE:I ___70.9' I Well Design (conventional, slimhole, etc.) I High angle well Formation Markers: Formation Tops MD TVD (SS) SV3 2790' 2790' 9-5/8" casing set below SV3 Ugnu 3603' 3602' Possible hydrocarbon bearing ~':"'~ ~ ~ HRZ 6500' 6600' Possible hydrocarbon bearing Kuparuk 7229' 6721' ,.~ ~ o ~ '1 Kingak 8169' 7661' '"~' ~" Sag River 9401' 8775' ~,~,,,,,,~ r~ ~ c...~: ~: Shublik 9469' 8804' ~-' ........... /~nr:hr~r Top Sadlerochit 9631' 8852' 7" casing point (at or near horz, TSAD - 5') TD of Well 11053' 8874' 4-1/2" liner point ~s. Co~.mission Casino/'l'ubinq Proqram: Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MDrrVD MDrFVD 30" 20" 91.5# H-40 Weld 80' 30'/30' 110'/110' 12-1/4" 9-5/8" 40# L-80 BTC-MO D 3071' 37?37' 3071 '/3071' 8-1/2" 7" 26/29# L-80/13-Cr BTC-MO D 9703' 37'/37' 9703'/8857' Lower Lateral 6" I 4-1/2" 12.6# 13-Cr NSCC 1500' 9553'/8830' 11053'/8874' Upper Lateral N/A I N/A N/A N/A N/A N/A N/A N/A I Production Tubing I 4-1/2" 12.6# 13-Cr NSCC 9250' 37'/37' 9250'/8701' Cementing Program: 'Lead (~ement Tail Cement Casin~t/Liner Sx ! Wt ! Yield Sx ! Wt / Yield Comments Cold Set Lead; Class G Tail; 100% excess 9-5/8" 1,002 / 12.2 / 1.92 305 / 15.8 / 1.15 Pump time=4+ hfs; TOC = Surface Premium Lead and Tail; Tail FW=0; 7" 279 / 11.0 / 3.31 158 / 15.8 / 1.15 30% excess; Pump time=4+ hrs; TOO = _+3,103' MD (_+500' above Ugnu) 4-1/2" None 194 / 15.7 / 1.119 Class G: 30% excess; TOC at liner top Volume assumptions: Gauge hole + designated excess; 80' shoe joints; TOC as designated. I Logs: 12-1/4" Hole 8-1/2" Hole Logging Program: 6" Hole Cased Hole: MWD Directional MWD Directional; DIFL/ML/CN/ZDL/DAL/GR/CHT (Ugnu, West Sak, Kuparuk only) Sidewall Cores (Ugnu, West Sak, Kuparuk only) FMT (RCI) Pressure Tool (Ugnu, West Sak, Kuparuk only) DLL/GR/Sonic (pilot hole only) MWD GR/Directional/Resistivity (RLL optional in lateral) None planned Mud Program: Surface Mud PrOperties: I 12-1/4" hole section: SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point ~lel gel Loss Initial 8.6 _+ 300 35-50 25-45 50-80 9-10 15-20 Final 9.4-9.8 180-220 20-40 15-30 30-50 9-10 15-20 Hazards/Concerns Bridging, large heavy gravels, wet clays. Frequent sweeps to aid hole cleaning. Intermediate Mud Properties: I 8-1/2" hole section (pilot hole and turn to horizontal): LSND Density Yield 10 sec' 10 min pH Fluid (PPG) PV Point ~lel gel Loss Initial 8.6-8.8 6-10 6-8 3-6 8-10 9.0-9.5 8-12 Cretaceous 9.8+ 10-12 8-12 4-8 8-12 9.0-9.5 <8 Final 10-10.2 16-20 8-12 LSYP 12-16 16-20 9.0-9.5 HTHP-<15.0 Hazards/Concerns Cretaceous overpressure expected, MW to be at least 9.8 ppg. Utilize hi vis sweeps to assist hole cleaning Monitor LSYP and increase if problems occur trying to' clean the hole. Potential high torque could need lubricant use. Reduce APl fluid loss to <8 cc before drilling Kingak Section. Differential sticking due to higher MW. Potential for vircjin pressure in the Sadlerochit (as high as 9.9 ppg EMW). Mud Proqram (continued): Production Mud~Propertie~: ' I 6" hole section: FIo-Pro Polymer Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 9.5-10.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Final 9.5-10.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Hazards/Concerns Potential for virgin pressure (as high as 9.9 ppg EMW) Lost Circulation due to overbalance in Sadlerochit. Differential sticking with overbalance situation. Perform report daily checks on KCI concentrations in Xanvis KCI system. Anticipated high torque to be combated with 2% Lubetex pre-mixed. Directional: I KOP: I 3,300' MD (Small nudge in surface hole) Maximum Hole Angle: I 90° Tangent Angle I N/A (S-shaped with high angle Close Approach Well: None Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. AnchofaE~e S-42 Operational Summary 1. MIRU. NU diverter and function test same. 2. Drill 12-1/4" hole to _+ 3,071' MD, (3,071' TVD). Run and cement 9-5/8", 47#, L-80 casing to surface. . . Install blowout prevention equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer. Function test BOPE to 5,000/250 psi. Test 9-5/8" casing to 3,00.._.~0 psi for 30 minutes. A formation leak-off test will be performed 10' below the shoe. Directionally drill 8-1/2" pilot hole through the Sadlerochit (Zone 4) @ +10,241' MD, 9,091' TVD. Run open logs consisting (as a minimum) of DLL/GR/Sonic. RFT's may be run pending hole conditions. Plug back pilot hole to 4- ' _9,703 MD (+90°) at or near planned 7" casing point. 6. Polish the cement plug to insure 7" casing is set +5' TVD into TSAD. Run 7" 29#, L-80 x 13-Cr casing string and cement with Class G cement to _+500' above the Ugnu formation (prognosed at _+3,603 MD). RU and pump fresh water mud down 9-5/8" x 7" annulus to insure clear for annular injection. Test casing to 3,500 psi for 30 minutes. Drill a 6" hole in the Sadlerochit Zone 4 interval to 11,053' MD, 8,874' TVD. Planned inclination is 90-88.5° along an azimuth of _+245°. POOH. Note: Inclination, azimuth and overall lateral length may be shortened by the onsite geologist. 9. Make a hole opener run to total depth. POOH. 10. Run 4-1/2" 12.6#, 13-Cr solid liner from total depth to _+150' inside 7" casing shoe and cement in place with Class G Cement back to the 7" casing shoe. Displace cement with filtered seawater. 11. RU and run 4-1/2", 13-Cr, production tubing. 12. 13. 14. Set two way check and test to 1,000 psi. ND BOPE. NU tree and test to 5,000 psi. Freeze protect well and release rig. Drilling Hazards MAR 0 1 1996 Oil & i? .... Cons. ,., Potential hydrocarbon-bearing zones expected above the Sag River include the Kuparuk, West Sak and Ugnu. A minimum of 9.8 ppg mud weight is planned for this interval. Gas cut mud has been experienced on previous S-Pad wells in this interval. Cement top is planned for 500' above the Ugnu. · Losses have been encountered drilling the Sag River, Shublik and Sadlerochit formations on other S-Pad wells. Be prepared for losses near any faults and formation interfaces between the Sag River, Shublik and Sadlerochit. · Shale sloughing, overpressure, stuck pipe and hole cleaning problems have been reported on several S-Pad wells. Mud weight, shale inhibition products, good hole cleaning and tripping practices should help minimize these problems. · Pore pressure may be as high as 9.9 ppg EMW in the Sadlerochit interval. · Faulting is prognosed for both lateral intervals and possibly in the Kingak shale interval. Lost circulation materials should be readily available. Disposal . Approval is requested for Annular Pumping on well S-42 and any other wells previously permitted on the pad (S-41 shall be primary contingency) for disposal activities by AGOCC. . The Base of the Permafrost for all wells located in the Prudhoe Bay Unit is 1,900' TVD. Aquifers in the Prudhoe Bay Unit have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #1 as referenced in Area Injection Order #3. . The receiving zone to which the fluids will migrate is identified as the Tertiary/Cretaceous sands formation just below _+3,071' TVD. The confining layer are the shales above the SV3 formation defined at +2,790' TVD. Additional data which demonstrates the confining layers, porosity, and permeability of the injection zone was submitted to the AOGCC on 7-24-95. . There are 39 wells on Pad/Drillsite S. There may be additional unidentified wells within a quarter mile distance from the subject well. There are no domestic or industrial water use wells located within one mile of the project area. . The drilling wastes to be disposed of during this operations can be defined as drilling mud, cement contaminated drilling mud, and drill cuttings; rig wash fluid (inclusive of rig boiler blow down, and mud and cement rinse water of associated rig equipment, completion fluids (seawater and brine), formation fluids, reserve pit fluids, and drill rig domestic waste water. (Note: if you plan to dispose of fluids OTHER than those outlined above you must list them on the request) The maximum volume to be disposed of in the annulus is 35,000 bbls. Fluid densities will range from 8.3 to 13.0 ppg. Any deviation from this program must be detailed separately. . The 9-5/8" surface casing shoe will be set at 3,071' MD (3,071' TVD) and cemented with 1,274 sacks of cement. This depth is below the base of the permafrost (1,900' TVD) and into the SV3 formation which has a long established history of annular pumping at S-Pad. The break down pressure of the SV-3 formation is estimated at 13.5 ppg equivalent mud weight. . The burst rating (80%) for the 9-5/8" surface casing is 5,496 psi. The collapse rating (80%) for the 7" intermediate/production casing is 5,616 psi. , The Maximum Allowable Surface Pressure while annular pumping is the lesser of 2,000 psi or the calculated pressure according to the following equation: MASP (psi) - (Max Breakdown ppg-8.3 ppg) X 0.052 X Surf Csg Shoe TVD MASP (psi) = 830 psi . The maximum pressure imposed at the surface casing shoe is calculated according to the following equation' Max Press @ Surf Csg Shoe (psi) = .052 x Max Breakdown ppg x Surf Csg Shoe TVD = 2,155 psi This pressure is less than the 80% burst and collapse casing pressures calculated in #7. 10. Additional data supplied as needed. DO NOT EXCEED 35,000 BBLS IN ANY ANNULUS. Annular Injection Wells on S-Pad (as of 2/20/96) PREV. VOLUME MAX. PERMITTED MAX. PERMITTED PERMITTED AREA WELL INJECTED VOLUME FLUID DENSITY DATES (aBES) (aBES) (PPG) WOA S-42 0 35,000 17.0 Pending Approval S-41 0 35,000 17.0 2/8/96 - 2/8/97 S-24 12,471 35,000 17.0 1 2/1/95 - 1 2/1/96 S-29 980 35,000 17.0 1/16/96 - 1/16/97 S-33 4,904 35,000 17.0 12/1/95 - 1 2/1/96 DO NOT EXCEED 35,000 BBLS IN ANY GIVEN ANNULUS. i BPX- Shamed S '/ices DriUing i Atasl<a S~ate Pta,~e: Zone4 i P]3U: WEI~'. S-Pad i 'S-4~ As-buit~ i~ S-4~ Wp l~ P~eUmina~y ii ii ITc~qet ~ Tong ~ Tang Pc~y Pc~y Pdy pt3 Pdy pt4 Pdy pti nudgep~nt ~rD I~ EW C~id X C~id Y KIP / ST,N;~T 13F BJILD 1~ 1.O0/lO0 r~ END I~ BUILD START I~ ~ @ 1.00/10O FI; -- 0,00 @ 27gl 1~ 0,00 I~ ~ MD t~iDDOTB MD, 13071 TVD -- 0.00 ~ 3300 MD START [}- I~ ~ 2.5(9/100 2,5g I~ 34110 MD 5.18 ~ 3500 MD 7.86 L~ 3604 MD UG4 10.'3~ e 3700 MD 12.94 @ 380O MD 15.53 e 89O0 MD 18.18 ~ 4O00 MD 20,7! I~ 41110 MD 23.30 ~ 4L:q]O ND 2~,48 ~ 4400 MD 3365 I~ 4GO0 MD 853 43.10 ~ ,5542 MD CM3 3731 ~ ~ MD 31.31 @ 6035 MD [:~31 ~ ~ MD i~o5 t9.31 I~ 6435 MD 16.31 @ 6535 MD 13.31 t~ ~ MD 10.31 ~ 6735 MD 7.31 I~ 6835 MD 4.31 ~ 6935 MD 0.~ 8 7079 ~ R~e4 · '~"~"' - HALLIBURTUN ! 2112/96 4~Og pn HERIZEINTAL ;~E~/ (TRUE bERTH) SCALE DDO t~, / DIVI§IDI SURVEY REF~ELLFEAD ii ii 150O 0 5O0 !000 1500 E~]0O . ORITIc.~_ PI]INT DaTA MD Inc Az~.~D ~S C~ TE R 0 ~ ~0~ 0 0 N 0 E ~ / ST~T ~ ~ . ~0~ ~ 0 N 0 E ~ ~LD ~ ~ ~ ~ILD ~ 4~ ~,~ ~ 0 S 14 ~ : 2791 ~ ~.~ 2~ 0 ST~T ~ ~ ~ ~.~ ~ 0 S ~.~/1 ~ r~ ~e4 7~ ~ ~ ~1 I~ S 1%7 E L~ ~1~ 7~ ~ O~ ~ I~S 1~7 E TAD ~40 ~ O~ ~ I~ S 1~7 E t~ 9~4 ~.~ z4em ~ ~ s~e ~k ~m ~m e4em ~ ~s~e4~e ~T ~ g7~ ~ 24~ ~ 4~ S 1~ E Z~e 4 ~76 ~ ~4~ ~1 ~ S ~ E ~ ~ ~ 1~ 4~ ~48~ ~ ~4 S ~ E '0.0O:t~ 8169 MD .KingokmiX'ii3 ' ' ' 1265 0110 g 8334 ND TJ 1~5 j ' ~.~ ~ ~76 ~ zme ........... WELLPLAN FEA,SIBILrIY b~R. IDY Thl~ plen I~ for fe~lbllity purpo~e~ only It h~ not yet been .rlilkgll - . , --.' '= PRI:F¢]S~ D ~ TVD gOg1.00 MD 11~41.34 VS 841.00 N./S 588.75 S E,g,/ 606.37 E [~te Ploi+z~d : 2/12/% AplD~ oved By : Date : '9~ 04:05PM ALASKA HALLIBURTOH DRILLIMG R.~x8 .; .................................................................... -~._.- ........................................ ~ m ..~$kc S¢c¢e Plcne: Zone4 PBU: .WDA: S-Pod S-4B As-bullet S-zl.;~ Wp 13 Honi zon Shelf, ed Set,' .es Dr, iLling Il mi n ~1" yT,,o Ta,-Re'~ N~ne t,~ E~/, . ~ x.. ~y ~ 511 S ~ ~ GI~IO ~nt 1~ 0 N ~ ~ VF_RTICAL ?¢%. / DMSION U_IEAD VF..RTIC~_ ~CTTC~N Ri~-: 0~30 ~ 0 I~D TW ~ 1700 twg. I 0~0 · aloo 450o ~,31 ~ ~ HD ~ · ~X~tc~ 7~61 o.oo M 816g I,~D ~n.c~ 0~30 e 833~ MD TdF O.C~ ~ 'g=J76 t4D T.JE o~ e ~740 ND T_ID 0.00 ~ 8858 ~D 1~_91 ~ 8958 e 1~.51/100 ?'t ~ 11.48/100 88~ e 1105~ MD D~ T~rg I-O:~[ZDNTAL. ,~Et,/ CI'RUE ~TH) ~C~LE 5OO ¢~. / DM$IDN /. ~ .-/ / HALLItIJRTON ~..~iR 0 i 1996 I~ce Plo't't4-ol : a/16/g6 Cr.e~'beci By , App,,oveciB'~¥ _. =.tMIT CHECKLIST INIT CLASS GEOL AREA 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary.. 6. Well located proper distance from other wells ..... 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ......... 9. Operator only affected party ............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval.. 13. Can permit be approved before 15-day wait ....... ENGINEERING REMARKS redrll [] aery [] wellbore seg n ON/OFF sao~ , , 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg.. ~ 17. CMT vol adequate to tie-in long string to surf csg . . Y 18. CMTwill cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... '~ N Adequate tankage or reserve pit ............. ~N 2O. 21. If a re-drill, has a 10-403 for abndnmnt been approved..Y~ ~ 22. Adequate wellbore separation proposed .......... ~ N 23. If diverter required, is it adequate .......... ~Y) N 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate .................... '~ N 26. BOPE press rating adequate; test to ~O psig.~ N 27. Choke manifold complies w/API RP-53 (M~y~7 ..... ~Y~ N 28. Work will occur without operation shutdown ....... .~ N 29. Is presence of H2S gas probable ............ ~ N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures 31. Seismic analysis of shallow gas zones .......... Data presented on potential overpressure zones ..... 32. 33. Seabed condition survey (if off-shore) ........ 34. Contact name/phone for weekly progress reports . . [exploratory only] GEOLOGY: ENGINEERING: JDH / COMMISSION: DWJ JDN ,, Comments/Instructions: , rev 11195 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, informati;3n of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. i-,..,-~,...,-,~,.- . ,xi-~' !-- ..... ~'-----'~'~- ~.'~t.'":.?~::L I~'';/~. ,~--:,..~ .... :~,..:.=-::..~---: ...... .~:.... !~ ~/'"~::~'"~':' ................. ' ...... :"' '"'~: ~'. ':- i ..... ~ -~ -. . "'~'~ ': ......... :._~.--:..-~-~ ....................... . .. ~ ~ ..... :--E~_E_~..: ~ .... . .,.~.: ..........  ~ ::"' '.:~=..'i'.. :::::::::::::::::::::::::::: ......~:. ========================================.~:-~ .... ~:':.::--: ~:-~.,~. .... .. * ........... :::::?::.>~ ..... i /:'. :~ .- ~'-~-~.~:_ .... i I :--~ 7368' WESTERN ATLAS Tape Subfile 2 is 'type[ iS TAPE HEADER PRUD}{OE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: RUN 1 6645.00 J. DAHL SEE REMARKS S-42 500292266200 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 22-APR-96 RUN 2 RUN 3 35 12N 12E 4181 4503 71.79 70.29 37.10 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 3077.0 8. 500 7442.0 DIFL/MLL/DAC/ZDL/CN/GR. CIRCULATION STOPPED AT 0730, 10-APR-96. LOGS WITNESSED BY: K. BOYD, P. ROBERTSON, J. COPEN, & C. DIXON. MLL CALIPER NOT AVIALABLE. MLL RESPONSE SUBJECT TO PAD CONTACT WITH BOREHOLE. BARITE PRESENT IN MUD SYSTEM (2.4%) CAN EFFECT PE RESPONSE. PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC- TIONS WERE APPLIED TO THE DIL DATA. THE MLL WAS CORRECTED FOR BOREHOLE & MUD CAKE EFFECTS & AN "RXO" CURVE WAS OUTPUT. THE DIL DATA WAS CALIPER CORRECTED THE CORRECTED DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES. RXO = RESISTIVITY OF FLUSHED ZONE. RT = TRUE FORMATION RESISTIVITY. DI = DEPTH OF INVASION. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER CORRECTED, CASING CORR :IONS OFF, SALINITY = 0.0 PPM. FILE ~ER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; depth shifted and clipped curves; hole data. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 3071.0 7296.0 BCS 3071.0 7283.0 DIL 3071.0 7395.0 MLL 3071.0 7369.0 SDN 3071.0 7320.0 2446 3071.0 7302.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH LL8 3190.5 3196.5 3198.0 3248 . 0 3248 . 0 3248.5 3249.5 3250 . 0 3251.5 3256.0 3262.0 3264.0 3312.0 3322.0 3331.0 3333.5 3369.5 3370.0 3375.5 3396.0 3397.5 3397.5 3398.0 3414.0 3415.5 3422.5 3423.0 3430.0 3430.0 3430.5 3435.5 3440.5 3443.0 3443.5 3447.0 3453.5 3453.5 3455.0 3457.0 3470.5 3476.0 3477.5 3483.5 EQUIVALENT UNSHIFTED DEPTH MLL ILD DT 3190.5 3196.0 3197.5 3247.5 3248.0 3249.5 3250.0 3251.0 3255.5 3262.0 3369.5 3396.5 3369.5 3397.5 3414.0 3430.5 3430.0 3453.0 3453.5 3455.0 3470.0 3423.0 3430.0 3440.5 3442.5 3446.5 3453.0 3470.0 all runs merged; RHOB 3190.0 3247.5 3251.0 3263.5 3311.5 3321.5 3329.5 3332.5 3374.5 3415.0 3422.0 3434.0 3443.0 3454.0 3456.0 3469.5 3475.0 3477.0 3482.5 no case 3487.0 3489.0 3489.5 3492.0 3503.0 3537.0 3581.0 3584.5 3588.5 3601.5 3602.5 3608.0 3609.0 3609.5 3614.0 3617.5 3621.0 3635.5 3640.5 3642.5 3643.0 3647.5 3648.0 3663 .0 3663.5 3684.5 3686.0 3687.0 3692.5 3693.0 3705.5 3715.5 3733.0 3733.5 3734.5 3735.5 3744.0 3748.0 3748.5 3750.5 3751.0 3754.5 3755.0 3760.0 3785.0 3787.0 3788.0 3791.0 3793 .5 3794.5 3796.0 3802.5 3811.0 3812.0 3816.5 3822.0 3827.5 3828.5 3831.5 3832.5 3588.5 3608.0 3614.0 3621.5 3642.5 3648.0 3663.0 3685.0 3687.5 3693.5 3706.0 3716.0 3748.5 3785.0 3802.5 3816.5 3487.0 3489.0 3588.0 3601.5 3602.0 3608.5 3609.5 3640.0 3664.0 3733.0 3734.0 3735.0 3735.5 3743.5 3748.0 3750.0 3790.0 3793.0 3793.5 3810.5 3811.5 3816.5 3827.5 3828.0 3831.0 3831.5 3588.5 3608.0 3614.0 3621.5 3642.5 3648.0 3663.0 3685.0 3687.5 3693.5 3706.0 3716.0 3748.5 3750.5 3754.5 3760.5 3784.5 3796.0 3802.5 3816.5 3822.5 3489.0 3503.0 3536.5 3584.0 3587.5 3613.0 3617.5 3693.5 3706.0 3749.0 3755.5 3785.0 3788.5 3486.0 3488.5 3491.0 3536.0 3580.5 3635.0 3643.0 3663.0 3685.5 3692.0 3705.0 3748.0 3751.0 3784.0 3786.5 3790.5 3810.0 3816.0 3837. 3842. 3843. 3855. 3855. 3857. 3860. 3864. 3868. 3873. 3874. 3888. 3892. 3910. 3913. 3917. 3925. 3927. 3937. 3938. 3938. 3943. 3945. 3948. 3952. 3957. 3958. 3959. 3993. 3996. 3999. 4003. 4004. 4009. 4012. 4015. 4022. 4025. 4032. 4039. 4044. 4048. 4050. 4056. 4060. 4060. 4073. 4091. 4101. 4103. 4125. 4137. 4137. 4148. 4154. 4154. 4171. 4184. 4185. 4187. 3854.5 3857.5 3860.5 3873.5 3910.5 3914.0 3917.0 3927.5 3939.0 3943.5 3948.0 3999.5 4009.0 4015.5 4025.0 4033.0 4039.5 4044.0 4051.0 4060.5 4073.0 4091.5 4101.5 4103.5 4137.5 4155.0 4171.5 3836.5 3842.0 3842.5 3855.0 3864.5 3892.0 3913.5 3916.5 3925.0 3927.5 3938.0 3948.0 3952.0 3957.5 3958.5 3959.0 4011.5 4015.5 4022.5 4125.0 4149.0 4154.0 4184.5 4185.0 4186.5 3854.5 3857.5 3860.5 3873.5 3910.5 3914.0 3917.0 3927.5 3939.0 3943.5 3948.0 3992.5 3999.0 4004.0 4009.0 4014.5 4025.0 4033.0 4039.5 4044.0 4051.0 4060.5 4073.0 4091.5 4101.5 4103.5 4137.5 4154.5 4171.5 3843.0 3860.0 3868.0 3916.5 3945.0 3948.0 3993.5 3997.0 4047.5 4138.0 4154.5 3854.0 3859.5 3873.5 3888.5 3910.0 3913.0 3916.0 3924.0 3926.0 3937.5 3942.5 3945.0 3947.0 3996.0 3998.5 4003.0 4014.5 4024.0 4031.5 4038.5 4043.0 4047.0 4055.0 4059.0 4072.0 4090.5 4102.5 4136.5 4153.5 4187. 4194. 4203. 4205. 4209. 4210. 4216. 4229. 4232. 4245. 4249. 4249. 4251. 4253. 4254. 4255. 4255. 4269. 4274. 4275. 4281. 4288. 4293. 4295. 4303. 4316. 4317. 4320. 4326. 4329. 4329. 4331. 4332. 4350. 4351. 4355. 4355. 4361. 4366. 4373. 4373. 4379. 4381. 4382. 4387. 4389. 4389. 4397. 4402. 4406. 4410. 4410. 4412. 4413. 4419. 4420. 4430. 4433. 4436. 4442. 4z~4.5 4206.0 4211.0 4217.0 4229.0 4232.5 4250.0 4268.5 4274.5 4281.5 4317.0 4327.0 4352.0 4373.5 4383.0 4390.0 4407.0 4411.5 4421.0 4434.0 4436.0 4187.5 4209.5 4245.5 4252.0 4254.5 4255.0 4255.5 4269.0 4274.5 4281.0 4289.0 4294.5 4295.0 4304.0 4316.5 4317.0 4320.0 4330.5 4332.0 4332.5 4356.0 4356.5 4362.0 4367.0 4373.5 4380.5 4383.0 4387.5 4397.5 4403.0 4406.5 4413.5 4420.5 4433.5 4442.5 4194.5 4210.5 4217.0 4229.0 4232.5 4250.0 4268.5 4274.5 4281.5 4317.0 4326.5 4352.0 4373.5 4383.0 4390.0 4407.0 4411.5 4421.0 4434.0 4436.0 4205.0 4249.0 4254.0 4275.0 4326.5 4351.5 4402.5 4410.0 4412.5 4202.5 4204.5 4254.5 4268.5 4273.5 4280.5 4329.0 4349.5 4361.5 4380.5 4388.0 4418.5 4429.0 4446.0 4448.0 4449.5 4473.0 4476.0 4486.5 4487.5 4488.0 4490.0 4492.5 4515.5 4517.5 4521.0 4545.0 4545.5 4562.0 4571.5 4572.0 4573.5 4574.0 4589.5 4594.0 4595.5 4600.5 4608.0 4610.0 4619.0 4620.0 4621.0 4632.5 4633.0 4634.5 4635.0 4641.5 4662.5 4665.0 4669.0 4669.5 4670.5 4671.0 4679.5 4691.5 4694.0 4698.0 4699.5 4703.0 4705.0 4707.5 4709.0 4715.0 4718.0 4721.5 4727.0 4735.5 4738.5 4739.0 4763.5 4777.5 4779.5 4801.5 ~ '$.0 4476.0 4487.5 4521.0 4545.5 4562.0 4572.0 4589.5 4600.0 4607.5 4632.5 4634.5 4663.0 4665.0 4679.0 4691.0 4693.5 4702.5 4717.5 4727.0 4735.5 4738.5 4779.5 4801.5 4450.0 4486.0 4492.0 4544.0 4573.5 4574.0 4589.5 4594.5 4596.0 4610.0 4620.0 4620.5 4635.0 4642.0 4669.5 4670.0 4670.5 4679.0 4691.0 4693.0 4697.5 4699.0 4705.5 4708.5 4715.0 4727.0 4735.5 4446.0 4476.0 4487.5 4521.0 4545.5 4562.0 4572.0 4589.5 4600.0 4607.5 4632.5 4634.5 4663.0 4665.0 4669.0 4679.0 4691.0 4693.5 4702.5 4717.5 4727.0 4735.5 4738.5 4779.5 4801.5 4489.5 4515.0 4545.0 4633.0 4635.5 4669.5 4693.5 4706.5 4726.5 4763.0 4778.0 4780.0 4446.0 4472.0 4486.5 4516.5 4571.0 4589.5 4607.5 4618.5 4631.5 4633.5 4669.5 4697.5 4706.5 4721.0 4725.5 4738.0 4762.5 4777.0 4779.0 4810.0 4816.0 4823.0 4834.0 4841.5 4844.0 4853.0 4853.5 4855.0 4862.5 4871.5 4873.0 4881.0 4908.5 4912.0 4913.0 4947.0 4957.5 4962.5 4963.0 4966.5 4981.0 4983.0 4983.5 5007.0 5007.5 5009.5 5018.5 5021.0 5021.5 5025.0 5025.5 5030.0 5030 '5 5037.5 5041.0 5053.0 5064.0 5064.5 5068.0 5073.0 5097.5 5103.0 5103.5 5110.0 5114.0 5118.0 5132.0 5133.5 5136.0 5140.5 5145.5 5148.0 5149 = · .., 5152.0 5153.5 5162.0 5166.5 5177.5 5185.0 4016.0 4841.5 4844.0 4853.0 4855.5 4908.0 4946.5 4962.5 4966.0 4981.0 4983.0 5021.0 5025.5 5031.0 5065.0 5073.5 5103.5 5110.5 5115.0 5132.5 5177.5 5184.5 4823.0 4852.5 4853.0 4863.0 4872.0 4872.5 4912.5 4913.5 4957.5 4966.5 4983.5 5007.5 5021.0 5025.0 5053.0 5065.5 5098.5 5119.0 5132.0 5136.0 5140.5 5151.5 5162.0 5178.0 4815.5 4833.5 4841.5 4844.0 4853.0 4855.5 4908.0 4946.5 4962.5 4966.0 4981.0 4983.0 5021.0 5025.5 5031.0 5064.5 5073.5 5103.5 5110.5 5115.0 5132.5 5146.5 5150.0 5177.5 5184.5 4844.0 4855.0 4947.0 4963.5 4981.0 5009.5 5019.0 5021.5 5029.5 5041.5 5064.5 5103.5 5134.0 5149.0 5166.0 4809.5 4815.0 4840.0 4843.5 4852.5 4880.0 4962.5 4980.5 5007.5 5018.0 5037.0 5064.0 5067.5 5102.5 5109.0 5153.0 5185.5 5191.0 5196.5 5202.5 5203.0 5211.5 5212.0 5215.0 5217.5 5220.0 5223.5 5225.0 5226.0 5232.0 5240.5 5241.0 5242.0 5248.5 5249.0 5256.0 5256.5 5257.5 5262.0 5263.0 5266.5 5281.5 5282.0 5286.5 5331.0 5355.0 5371.0 5376.0 5411.5 5413.5 5430.0 5433.0 5464.5 5482.5 5486.5 5487.0 5494.0 5506.5 5507.5 5522.0 5533.0 5546.0 5561.0 5576.0 5611.5 5615.0 5626.0 5626.5 5628.5 5630.5 5641.5 5647.0 5667.0 5668.5 5675.0 5692.5 5190.5 5202.0 5210.5 5215.0 5220.5 5225.5 5232.5 5256.0 5267.0 5282.0 5331.0 5355.5 5432.5 5488.0 5495.0 5507.0 5533.5 5546.5 5561.0 5614.0 5625.5 5642.5 5186.0 5196.5 5202.0 5211.5 5217.5 5224.5 5227.0 5241.5 5242.5 5250.0 5255.5 5262.5 5263.5 5267.5 5286.5 5356.0 5371.0 5376.0 5412.0 5431.0 5483.5 5495.0 5507.5 5523.0 5534.0 5546.0 5611.5 5627.5 5629.5 5648.0 5668.5 5670.0 5693.5 5190.5 5202.0 5210.5 5215.0 5220.5 5225.5 5232.5 5256.0 5267.0 5282.0 5331.0 5355.5 5432.5 5488.0 5495.0 5507.0 5533.5 5545.5 5561.0 5614.0 5626.0 5642.5 5201.5 5216.0 5240.5 5248.5 5258.0 5266.0 5282.0 5331.0 5355.0 5413.0 5485.5 5494.0 5506.0 5576.5 5626.5 5674.5 5184.5 5202.0 5263.5 5355.0 5411.5 5464.5 5521.5 5575.5 5611.5 5624.5 5645.5 5699. 5700. 5705. 5709. 5731. 5735. 5746. 5746. 5756. 5763. 5764. 5769. 5796. 5814. 5833. 5835. 5862. 5867. 5877. 5885. 5918. 5921. 5923. 5929. 5963. 5974. 6155. 6183. 6275. 6324. 6366. 6367. 6372. 6374. 6390. 6431. 6597. 6619. 6666. 6672. 6681. 6697. 6723. 6723. 6774. 6775. 6791. 6794. 6803. 6811. 6829. 6830. 6840. 6841. 6857. 6879. 6893. 6896. 6921. 6924. 5701.0 5756.0 5796.0 5834.0 5867.5 5919.0 5974.5 6367.5 6374.0 6723.0 6773.5 6790.5 6830.5 6858.0 5700.5 5735.0 5746.5 5763.5 5764.0 5834.5 5867.0 6372 .5 6597.0 6697.0 6896.0 5701.0 5756.0 5796.0 5834.0 5867.5 5919.0 5974.5 6367.5 6374.0 6723.0 6773.5 6790.5 6830.5 6858.0 5706.0 5710.0 5746.5 5769.5 5815.0 5862.5 5877.0 5884.5 5918.0 5920.5 5923.5 5929.5 5963.0 6183.0 6275.0 6324.0 6367.0 6431.5 6619.0 6672.0 6682.0 6723.0 6774.5 6790.5 6811.5 6829.5 6840.5 6858.0 6895.5 6921.0 6924.0 5731.0 5867.0 6155.5 6366.0 6389.0 6666.5 6794.5 6803.5 6829.5 6840.5 6879.0 6893.5 6946.0 6951.5 6971.0 6977.0 6978.5 6981.0 6982.5 6984.0 7000.5 7019.5 7020.0 7030.0 7031.5 7047.0 7047.5 7068.0 7075.0 7077.5 7083.5 7091.0 7091.5 7095.5 7102.0 7109.0 7122.5 7142.0 7144.5 7165.5 7168.5 7178.0 7202.0 7202.5 7221.5 7229.5 7241.0 7252.5 7253.0 7255.0 7256.5 7257.5 7258.0 7263.5 7264.0 7269.0 7270.5 7277.0 7282.0 7284.0 $ BASELINE DEPTH 3248.5 3328.5 3444.0 3453.5 3455.5 3458.0 3463.5 3537.0 3553.0 3591.0 6752.0 6981.5 7030.0 7083.0 7090.0 7142.0 7167.5 7176.5 7221.0 7240.5 7252.0 7254.0 7257.5 7269.0 7277.5 NPHI 3248.5 3329.0 3444.0 3454.0 3456.0 3458.5 3464.5 3537.0 3553.5 3591.5 6982.0 6984.5 7047.0 7077.5 '7094.5 7167.0 7176.0 7200.5 7240.0 7252.0 7262.5 7263.5 7270.0 6952.0 6981.5 7030.0 7083.0 7090.0 7142.0 7167.5 7176.5 7221.0 7241.5 7252.0 7254.0 7257.5 7269.0 7277.5 ;946.0 6970.5 6977.0 6983.0 7020.0 7031.5 7046.5 7067.0 7074.0 7083.5 7091.0 7101.5 7108.5 7122.0 7168.0 7176.5 7201.0 7221.0 7229.0 7257.0 6945.5 6978.0 6982.5 7000.5 7019.5 7144.5 7165.5 7178.0 7256.5 7277.0 7282.0 7283.5 3663.0 3693.0 3705.5 3748.0 3787.5 3811.0 3816.5 3820.0 3860.5 3889.0 3945.5 3976.5 4015.5 4025.0 4032.5 4039.0 4060.5 4103.0 4154.0 4182.0 4194.5 4203.5 4205.5 4239.5 4250.0 4267.5 4274.5 4281.5 4317.5 4326.5 4351.0 4361.5 4385.0 4410.5 4420.5 4427.0 4430.0 4478.5 4488.0 4521.0 4545.5 4562.0 4571.5 4600.5 4607.5 4637.0 4653.0 4691. 4722.0 4735.5 4751.5 4762.5 4799.0 4858.0 4870.5 4947.0 5022.5 5029.0 5121.0 5203.0 _ 3.5 3693.5 3706.0 3748.5 3787.5 3810.5 3816.0 3820.0 3860.0 3889.5 3945.5 3976.5 4015.5 4025.0 4032.5 4039.0 4060.0 4103.0 4154.0 4181.5 4194.0 4203.5 4206.0 4239.5 4250.5 4267.5 4275.0 4282.5 4317.5 4327.0 4350.5 4361.0 4385.0 4410.5 4421.0 4426.5 4430.5 4477.5 4488.0 4520.5 4545.5 4562.0 4571.5 4600.5 4607.0 4637.0 4653.0 4691.5 4722.0 4736.0 4751.0 4762.5 4799.0 4858.5 4869.5 4947.0 5022.5 5029.5 5120.5 5203.0 5250.0 5256.5 5579.5 5615.0 5794.5 5861.5 6366.5 6371.5 6774.5 6846.0 6896.0 6922.0 6951.5 7000.0 7083.0 7222.5 7241.5 7253.0 7277.0 7282.5 7290.5 MERGED DATA SOURCE PBU TOOL CODE GR BCS DIL MLL SDN 2446 $ REMARKS: 5 9.5 5257.0 5580.0 5615.5 5794.5 5861.5 6366.5 6371.5 6775.0 6846.0 6896.0 6922.0 6952.0 7000.0 7083.0 7222.5 7242.0 7253.5 7278.0 7283.0 7290.5 RUN NO. PASS NO. MERGE TOP 1 5 3071.0 1 5 3071.0 1 5 3071.0 1 5 3071.0 1 5 3071.0 1 5 3071.0 OPEN HOLE portion of MAIN PASS. SP, MTEM, TEND, & TENS WERE SHIFTED WITH LL8. RXO WAS SHIFTED WITH MLL. ILM, RT, & DI WERE SHIFTED WITH ILD. DRHO, PEF, & CALl WERE SHIFTED WITH R/ROB. FUCT & NUCT WERE SHIFTED WITH NPHI. MERGE BASE 7296.0 7283.0 7395.0 7369.0 7320.0 7302.0 / ? ?MATCH1. OUT / ? ?MATCH2. OUT / ? ?MATCH3. OUT / ? ?MATCH4. OUT / ? ?MATCH5. OUT /? ?MATCH6 .OUT $ CN : BP EXPLORATION WN :.S - 42 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME (ALASKA) Tape depth ID: F 20 Curves: Name Tool Code Samples Units 1 GR DAS 68 1 GAPI 2 DT DAS 68 1 US/F 3 TEND DAS 68 1 LB 4 TENS DAS 68 1 LB 5 LL8 DIL 68 1 OHNM 6 ILM DIL 68 1 OHMM 7 ILD DIL 68 1 OHMM 8 RT DIL 68 1 OHMM 9 DI DIL 68 1 IN 10 SP DIL 68 1 MV 11 MTEM DIL 68 1 DEGF 12 MLL MLL 68 1 OHMM 13 RXO MLL 68 1 OHMM 14 RHOB SDN 68 1 G/C3 15 DRHO SDN 68 1 G/C3 16 PEF SDN 68 1 BN/E 17 CALl SDN 68 1 IN 18 NPHI 2446 68 1 PU-S 19 FUCT 2446 68 1 CPS 20 NUCT 2446 68 1 CPS * DATA RECORD (TYPE# 0 ) Total Data Records: 722 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 59 310 01 1 4 4 59 530 16 1 4 4 59 995 99 1 4 4 59 995 99 1 4 4 08 995 99 1 4 4 08 995 99 1 4 4 08 995 99 1 4 4 08 995 99 1 4 4 08 995 99 1 4 4 08 995 99 1 4 4 08 995 99 1 4 4 20 995 99 1 4 4 20 995 99 1 4 4 49 995 99 1 4 4 49 995 99 1 4 4 49 995 99 1 4 4 49 995 99 1 4 4 47 995 99 1 4 4 47 995 99 1 4 4 47 995 99 1 80 1014 BYTES * Tape File Start Depth = 7402.000000 Tape File End Depth = 3071.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 181924 datums Tape Subfile: 2 1438 records... Minimum record length: Maximum record length: 44 bytes 1014 bytes Tape Subfile 3 is type: LIS TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 1 5 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 3000.0 7300.0 DAC 3041.0 7287.0 DIFL 3045.0 7399.0 MLL 3018.0 7373.0 ZDL 3000.0 7323.0 2446 3044.0 7306.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIR~TION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : 10-APR-96 ECLIPS 2.1 730 10-APR-96 0 7442.0 7438.0 3071.0 7435.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT SP TEMP COMR GR CN ZDL KNJT KNJT DAC KNJT SLAM MLL DIFL $ CABLEHEAD TENSION SP SUB TEMPERATURE COMMON REMOTE GAMMA RAY COMPENSATED NEUTRON Z - DENS I LOG KNUCKLE JOINT KNUCKLE JOINT DIGITAL ACOUSTILOG KNUCKLE JOINT SLAM ADAPTER MICRO LATEROLOG DUAL INDUCTION TOOL NUMBER CABL338 3966ZZ 3981XA 3510XA 1329XA 2446XA 2228EA/2228MA 3923XA 3923XA 1667EA/1680MA 3923XA 3516XA 1233XA 1503XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT): 8.500 3077.0 3071.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENS I TY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S - 42 : PRUDHOE BAY : NORTH SLOPE : ALASKA L 3 10.00 56.0 9.6 4.4 134.0 1.630 .924 1.336 .000 2.260 .000 THERMAL SANDSTONE 2.65 .000 1.5 76.0 134.0 77.0 .0 78.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units API API API API Lo9 Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 GR DAC 68 1. GAPI DT24 DAC 68 1 US/F CHT DAC 68 1 LB TTEN DAC 68 1 LB SPD DAC 68 1 F/MN RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM RT DIFL 68 1 OHMM DI DIFL 68 1 IN SP DIFL 68 1 MV WTBH DIFL 68 1 DEGF RMLLMLL 68 1 OHMM RXO MLL 68 1 OHMM ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E 4 4 56 310 01 1 4 4 56 520 99 1 4 4 56 635 99 1 4 4 56 635 99 1 4 4 56 636 99 1 4 4 07 220 06 1 4 4 07 120 44 1 4 4 07 120 46 1 4 4 07 120 46 1 4 4 07 120 44 1 4 4 07 010 01 1 4 4 07 995 99 1 4 4 20 270 03 1 4 4 20 935 02 1 4 4 46 350 01 1 4 4 46 356 99 1 4 4 46 358 01 1 18 CAL ZDL 66 1 IN 19 CNC 2446 68 1 PU-S 20 CNCF 2446 68 1 PU-S 21 LSN 244 6 68 1 CPS 22 SSN 2446 68 1 CPS * DATA RECORD (TYPE# 0 ) Total Data Records: 1628 1018 BYTES * 46 280 99 = 47 995 99 4 47 995 99 4 47 334 31 4 47 334 30 88 Tape File Start Depth = 7402.000000 Tape File End Depth = 2927.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 411724 datums Tape Subfile: 3 1715 records... Minimum record length: Maximum record length: 62 bytes 1018 bytes ~Tape Subfile 4 is type: ~IS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 4 .2500 VENDOR TOOL CODE START DEPTH GR 7040.0 DAC 7136.0 DIFL 7140.0 MLL ZDL 2446 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : 7113.0 7100.0 7139.0 STOP DEPTH 7356.0 7344.0 7445.0 7429.0 7380.0 7362.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT SP TEMP COMR GR CN ZDL KNJT KNJT DAC KNJT SLAM MLL DIFL $ CABLEHEAD TENS ION SP SUB TEMPERATURE COMMON REMOTE GAMMA RAY COMPENSATED NEUTRON Z - DENS I LOG KNUCKLE JOINT KNUCKLE JOINT DIGITAL ACOUSTILOG KNUCKLE JOINT SLAM ADAPTER MICRO LATEROLOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER' S CASING DEPTH (FT) : LOGGER' S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): 10 -APR- 96 ECLIPS 2.1 730 0 7442.0 7438.0 3071.0 7435.0 1500.0 10-APR-96 TOOL NUMBER CABL338 3966ZZ 3981XA 3510XA 1329XA 2446XA 2228EA/2228MA 3923XA 3923XA 1667EA/1680MA 3923XA 3516XA 1233XA 1503XA 8.500 3077.0 3071.0 LSND 10.00 MUD VISCOSITY (S)~-' MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT MUD FILTRATE AT MT.- MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : REMARKS: REPEAT PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S - 42 : PRUDHOE BAY : NORTH SLOPE ~ 0 9.6 4.4 134.0 1.630 .924 1.336 .000 2.260 .000 THERMAL SANDSTONE 2.65 .000 1.5 76.0 134.0 77.0 .0 78.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Name Tool Code Samples Units GR .DAC 68 1 GAPI DT24 DAC 68 1 US/F CHT DAC 68 1 LB TTEN DAC 68 1 LB SPD DAC 68 i F/MN RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM RT DIFL 68 1 OHMM DI DIFL 68 1 IN SP DIFL 68 1 MV WTBH DIFL 68 1 DEGF RMLL MLL 68 1 OHMM RXO MLL 68 1 OHMM ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN CNC ' 2446 68 1 PU-S API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 56 310 01 1 4 56 520 99 1 4 56 635 99 1 4 56 635 99 1 4 56 636 99 1 4 07 220 06 1 4 07 120 44 1 4 07 120 46 1 4 07 120 46 1 4 07 120 44 1 4 07 010 01 1 4 07 995 99 1 4 20 270 03 1 4 20 935 02 1 4 46 350 01 1 4 46 356 99 1 4 46 358 01 1 4 46 280 99 1 4 47 995 99 1 20 CNCF 2446 6f 1 PU-S 4 21 LSN 2446 68 1 CPS 4 22 SSN 2446 68 1 CPS 4 * DATA RECORD (TYPE# 0) Total Data Records: 160 1018 BYTES * 47 995 99 4 47 334 31 4 47 334 30 88 Tape File Start Depth = 7459.000000 Tape File End Depth = 7020.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 222336 datums Tape Subfile: 4 245 records... Minimum record length: Maximum record length: 62 bytes 1018 bytes Tape Subfile 5 is type: LIS 96/ 4/22 01 **** REEL TRAILER **** 96/ 4/22 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 22 APR 96 l:05p Elapsed execution time = 9.83 seconds. SYSTEM RETURN CODE = 0 Tape ~ubfile 2 is type: TAPE HEADER PRUDHOE BAY I/NIT MWD/MAD LOGS ~ ~ OPERATOR. ~. ~. ~ ~S I', ~, ,.~' - LOGGING , ;_ / TAPE ¢REATION~ ~ ~ ~- 30B DATA ~*~ ~D R~ 3 JOB ~BER: ~-~-60416 LOGGING ENGINEER: R. JACKSON OPE~TOR WIT~SS: C. DIXON S-42 500292266200 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 24-JAN-97 MWD RUN 4 R. JACKSON C. DIXON MWD RUN 5 R. JACKSON C. DIXON MWD RUN 9 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD E. CRIBBS K. WHITE MWD RUN 10 E. CRIBBS K. WHITE 35 12N 12E 4181 4503 71.79 70.29 37.10 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 30.000 20.000 110.0 2ND STRING 12.250 9.625 3077.0 3RD STRING 8.500 7.000 9375.0 PRODUCTION STRING 6.000 10692.0 REMARKS: MWD RUN 11 E. CRIBBS K. WHITE MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. THIS WELL, S-42, IS REPRESENTED BY MWD RUNS 1 THROUGH 5, AND 9, 10, & 11. MWD RUNS 1 & 2 WERE DIRECTIONAL ONLY & NO DATA IS PRESENTED. MWD RUNS 3 & 4 WERE DIRECTIONAL WITH GAMMA RAY (SGRD). MWD RUN 5 WAS DIRECTIONAL WITH GAMMA RAY (SGRD), AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). GAMMA RAY DATA TO 9375' WAS ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTORS (NGP/SGRD). MWD RUNS 9, 10, & 11 WERE DIRECTIONAL WITH GAMMA RAY (SGRC), AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). GAMMA RAY DATA FROM 9375' - 10651' WAS ACQUIRED WITH DUAL GAMMA RAY, GEIGER MUELLER DETECTORS (DGR/SGRC). THIS WELL' ] KICKED-OFF FROM S-42 PB~ NINTENTIONALL¥ WHILE COk~ECTING A LOST CIRCULATION ~ROBLEM AT 9375' THE WELL WAS DRILLED TO TD AT 10692'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 5024.0 RP 8762.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 5024.5 5026.5 5030.0 5032.0 5038.0 5038.5 5064.5 5065.5 5068.5 5071.0 5072.5 5074.5 5087.5 5087.0 5103.0 5103.5 5105.5 5107.0 5110.0 5111.0 5115.0 5116.5 5130.0 5131.5 5136.0 5137.0 5148 . 0 5149 . 0 5157.5 5158.5 5180.5 5183.5 5185.5 5189.0 5191.0 5192.5 5202.5 5203.5 5213.5 5215.0 5217.5 5219.0 5219.5 5221.0 5256.0 5257.0 5263.0 5265.0 5286.5 5287.5 5355.0 5356.5 5,358.5 5358.5 5370.5 5374.0 5408.5 5409.0 5413.5 5413.0 5428 . 0 5429 . 0 5443 . 0 5445 . 0 5455 . 0 5456 . 0 5464.5 5466.5 5478.5 5478.5 5487.0 5487.5 5494.5 5498.0 5506.0 5509.0 5520.0 5523.0 5533.0 5536.0 5544.0 5546.0 5602.5 5605.0 5611.5 5613.5 all bit runs merged. STOP DEPTH 10644.0 10651.0 EQUIVALENT UNSHIFTED DEPTH 5626.5' 5629.5 5634.0 5709.0 5746.5 5768.5 5824.5 5833.5 5867.0 5872.5 5879.5 5995.5 6321.0 6325.0 6331.0 6366.5 6371.5 6390.5 6619.5 6666.5 6682.0 6723.5 6775.0 6782.5 6791.5 6811.5 6830.0 6841.0 6857.5 6860.0 6875.5 6922.0 ' 6946.0 6960.5 6969.5 6979.5 6984.5 6992.5 7010.0 7012.0 7020.0 7030.5 7122.5 7169.0 7177.5 7181.5 7202.0 7204.5 7221.5 7230.0 7241.0 7243.0 7252.5 7268.5 7284.0 7299.5 10685.5 $ MERGED DATA SOURCE 56' 5 563~ .0 5637.0 5712.0 5750.0 5772.0 5829.0 5838.0 5872.0 5875.5 5884.5 5999.0 6326.5 6331.0 6335.0 6373.5 6380.0 6396.0 6626.5 6674.5 6690.5 6730.5 6782.0 6790.0 6798.0 6818.5 6838.0 6848.5 6866.0 6867.5 6884.0 6930.5 6954.5 6969.0 6978.0 6987.5 6993.0 7001.0 7017.5 7020.0 7028.5 7038.0 7130.0 7175.0 7184.0 7188.0 7209.5 7212.5 7228.5 7236.5 7247.5 7249.0 7259.0 7275.0 7291.0 7306.0 10692.0 PBU' TOOL CODE MWD MWD $ REMARKS: BIT ~N NO MERGE TOP 3 5098.0 4 7443.0 5 8850.0 9 9375.0 10 9652.0 11 10180.0 MERGED MAIN PASS. MERGE ~ 7443.0 8850.0 9375.0 9652.0 10180.0 10692.0 CN WN FN COUN STAT / ? ? SHIFT. OUT $ : BP EXPLORATION (ALASKA) : S-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 366 Tape File Start Depth = 10692.000000 Tape File End Depth = 5024.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 90697 datums Tape Subfile: 2 568 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 3 is type: FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 5026.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 7367.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPER3kTURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA1XrDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: MWD RUN 3. 10-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 7443.0 5098.0 7443.0 0 .6 51.6 TOOL NUMBER NGP 94 8.500 3077.0 LSND 10.20 55.0 8.9 600 4.6 .000 .000 .000 .000 .0 133.2 .0 .0 .00 .000 .0 0 CN WN FN COLIN STAT : BP EXPLORATION (ALASKA) : S-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 58 Tape File Start Depth = 7450.000000 Tape File End Depth = 5026.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14548 datums Tape Subfile: 3 Minimum record length: Maximum record length: 121 records... 62 bytes 1014 bytes Tape Subfile 4 is type: L ~ FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 7367.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8774.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 4. 13-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 8850.0 7443.0 8850.0 0 .3 1.2 TOOL NUMBER NGP 159 8.500 3077.0 LSND 10.00 44.0 9.7 500 4.0 .000 .000 .000 .000 .0 150.1 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S -42 : PRUDHOE BAY : NORTH SLOPE : ALAS~ * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 37 Tape File Start Depth = 8900.000000 Tape File End Depth = 7350.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 100001 datums Tape Subfile: 4 100 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: _ S FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT R UNNO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8766.0 EWR4 8769.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9430.0 9410.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 14-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 9491.0 8850.0 9491.0 0 .5 60.0 TOOL NUMBER P0519CR6 P0519CR6 8.500 3077.0 LSND 10.10 44.0 9.4 500 4.2 1.050 .450 1.800 2.250 66.0 165.0 66.0 66.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 5. DATA BELOW THE KICK-OFF-POINT OF 9375' IS FROM THE WELL S-42 PB1. $ : BP EXPLORATION (ALASKA) : S-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 49 Tape File Start Depth = 9500.000000 Tape File End Depth = 8750.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 26557 datums Tape Subfile: 5 116 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 6 is type: FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8949.0 EWR4 8954.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9607.0 9614.0 21-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 9652.0 9375.0 9652.0 0 46.2 84.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0498SP4 P0498SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9375.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 10.30 67.0 8.2 10200 6.3 .350 .140 .280 .390 64.0 170.4 64.0 64.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 9. $ : BP EXPLORATION (ALASKA) : S-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 9O 995 99 1 4 9O 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 50 Tape File Start Depth = 9670.000000 Tape File End Depth = 8900.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 112330 datums Tape Subfile: 6 115 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 7 is type: F I LE HEA/DER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9578.0 EWR4 9585.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 10041.0 10048.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 22-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 10180.0 9652.0 10180.0 0 84.0 86.6 TOOL NUMBER P0498SP4 P0498SP4 6.000 9375.0 FLO-PRO 10.10 59.0 8.2 93000 5.4 .130 .052 .150 .180 65.0 170.4 65.0 65.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 10 $ :BP EXPLORATION (ALASKA) : S-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 2 RPX MWD 68 3 RPS MWD 68 4 RPM MWD 68 5 RPD MWD 68 6 FET MWD 68 7 ROP MWD 68 1 AAPI 4 1 OHMM 4 1 OHMM 4 1 OHMM 4 1 OHMM 4 1 HR 4 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 35 Tape File Start Depth = 10100.000000 Tape File End Depth = 9560.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 35206 datums Tape Subfile: 7 100 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 8 is type: FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10041.0 EWR4 10048.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10651.0 10658.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 25-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 10692.0 10180.0 10692.0 0 85.4 87.1 TOOL NUMBER P0498SP4 P0498SP4 6.000 9375.0 FLO- PRO 9.60 44.0 8.0 85000 6.6 .150 .063 .200 .180 66.0 166.0 66.0 66.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 11_ $ : BP EXPLORATION (ALASKA) : S-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 2 RPX MWD 68 3 RPS MWD 68 4 RPM MWD 68 5 RPD MWD 68 6 FET MWD 68 7 ROP MWD 68 1 AAPI 4 1 OHMM 4 1 OHMM 4 1 OHMM 4 1 OHMM 4 1 HR 4 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 9O 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 44 Tape File Start Depth = 10692.000000 Tape File End Depth = 10025.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 123011 datums Tape Subfile: 8 109 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 9 is type: 01 **** REEL TRAILER **** 97/ 1/27 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 27 JAN 97 8:32a Elapsed execution time = 4.01 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT WELL NAME: ~"~!~'~' S-42 PB1 API NUMBER: OPERATOR: LOGGING COMP~,:~i"% TAPE CREATION D~: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 3 AK-MM- 60416 R. JACKSON C. DIXON 500292266270 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 24-JAN-97 MWD RUN 4 R. JACKSON C. DIXON MWD RUN 5 R. JACKSON C. DIXON MWD RUN 6 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: R. JACKSON C. DIXON MWD RUN 7 WELL CASING RECORD OPEN HOLE E. CRIBBS C. DIXON 35 12N 12E 4181 4503 71.79 70.29 37.10 CAS ING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 30.000 20.000 110.0 3RD STRING 12.250 9.625 3077.0 PRODUCTION STRING 8.500 10261.0 REMARKS: MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. THIS WELL, S-42 PB1, IS REPRESENTED BY MWD RUNS 1 THROUGH 7. MWD RUNS 1 & 2 WERE DIRECTIONAL ONLY & NO DATA IS PRESENTED. MWD RUNS 3 & 4 WERE DIRECTIONAL WITH GAMMA RAY (SGRD). MWD RUNS 5, 6~ & 7 WERE DIRECTIONAL WITH GAMMA RAY (SGRD), AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). ALL GAMMA RAY DATA WAS ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTORS (NGP/SGRD). THIS WELL WAS DRILLED TO 10261' PRIOR TO BEING UNINTENTIONALLY SIDETRACKED AT 9375' WHILE ATTEMPT- .. / ING TO f RECT A LOST CIRCULATION P. 3LEM. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 5024.0 RP 8762.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 5024.5 5026.5 5030.0 5032.0 5038.0 5038.5 5064.5 5065.5 5068.5 5071.0 5072.5 5074.5 5087.5 5087.0 5103.0 5103.5 5105.5 5107.0 5110.0 5111.0 5115.0 5116.5 5130.0 5131.5 5136.0 5137.0 5148.0 5149.0 5157.5 5158.5 5180.5 5183.5 5185.5 5189.0 5191.0 5192.5 5202.5 5203.5 5213.5 5215.0 5217.5 5219.0 5219.5 5221.0 5256.0 5257.0 5263.0 5265.0 5286.5 5287.5 5355.0 5356.5 5358.5 5358.5 5370.5 5374.0 5408.5 5409.0 5413.5 5413.0 5428.0 5429.0 5443.0 5445.0 5455.0 5456.0 5464.5 5466.5 5478.5 5478.5 5487.0 5487.5 5494.5 5498.0 5506.0 5509.0 5520.0 5523.0 5533.0 5536.0 5544.0 5546.0 5602.5 5605.0 5611.5 5613.5 all bit runs merged. STOP DEPTH 10192.0 10172.0 EQUIVALENT UNSHIFTED DEPTH 5626.5 5629.5 5634.0 5709.0 5746.5 5768.5 5824.5 5833 .5 5867.0 5872.5 5879.5 5995.5 6321.0 6325.0 6331.0 6366.5 6371.5 6390.5 6619.5 6666.5 6682.0 6723.5 6775.0 6782.5 6791.5 6811.5 6830.0 6841.0 6857.5 6860.0 6875.5 6922.0 6946.0 6960.5 6969.5 6979.5 6984.5 6992.5 7010.0 7012.0 7020.0 7030.5 7122.5 7169.0 7177.5 7181.5 7202.0 7204.5 7221.5 7230.0 7241.0 7243.0 7252.5 7268.5 7284.0 7299.5 0253.5 MERGED DATA SOURCE 56 5 5633.0 5637.0 5712.0 5750.0 5772.0 5829.0 5838.0 5872.0 5875.5 5884.5 5999.0 6326.5 6331.0 6335.0 6373.5 6380.0 6396.0 6626.5 6674.5 6690.5 6730.5 6782.0 6790.0 6798.0 6818.5 6838.0 6848.5 6866.0 6867.5 6884.0 6930.5 6954.5 6969.0 6978.0 6987.5 6993.0 7001.0 7017.5 7020.0 7028.5 7038.0 7130.0 7175.0 7184.0 7188.0 7209.5 7212.5 7228.5 7236.5 7247.5 7249.0 7259.0 7275.0 7291.0 7306.0 10260.5 pBu TOOL CODE $ REMARKS: B IT IN NO MERGE TOP 3 5098.0 4 7443 . 0 5 8850.0 6 9491.0 7 10047.0 MERGED MAIN PASS. MERGE 1 E 7443.0 8850.0 9491.0 10047.0 10261.0 CN WN FN COUN STAT /? ?SHIFTPB1. OUT $ : BP EXPLORATION (ALASKA) : S-42 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 9O 995 99 1 4 90 640 99 1 4 9O 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 338 Tape File Start Depth = 10261.000000 Tape File End Depth = 5024.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 83801 datums Tape Subfile: 2 535 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 3 is type: LiS FILE HEADER FILE NLTMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 5026.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 7367.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 3. 10-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 7443.0 5098.0 7443.0 0 .6 51.6 TOOL NUMBER NGP 94 8.500 3077.0 LSND 10.20 55.0 8.9 600 4.6 .000 .000 .000 .000 .0 133.2 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S-42 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 58 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 995 99 1 Tape File Start Depth = 7450.000000 Tape File End Depth = 5026.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14548 datums Tape Subfile: 3 121 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: FILE HEADER FILE NLTMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BlT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 7367.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (.MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8774.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: METD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 4. 13-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 8850.0 7443.0 8850.0 0 .3 1.2 TOOL NUMBER NGP 159 8.500 3077.0 LSND 10.00 44.0 9.7 500 4.0 .000 .000 .000 .000 .0 150.1 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S-42 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 37 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 995 99 1 Tape File Start Depth = 8900.000000 Tape File End Depth = 7350.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 93105 datums .Tape Subfile: 4 100 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LAS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT R UNNO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8766.0 EWR4 8769.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) ~MINIMIIMANGLE: MAXIMUMANGLE: STOP DEPTH 9430.0 9410.0 14-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 9491.0 8850.0 9491.0 0 .5 60.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ TOOL NUMBER P0519CR6 P0519CR6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 8.500 3077.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.10 44.0 9.4 500 4.2 1.050 .450 1.800 2.250 66.0 165.0 66.0 66.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALAS~) : S-42 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 49 Tape File Start Depth = 9500.000000 Tape File End Depth = 8750.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 26557 datums Tape Subfile: 5 114 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9430.0 EWR4 9410.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9985.0 9966.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 16-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 10047.0 9491.0 10047.0 0 61.2 84.6 TOOL NUMBER P0519CR6 P0519CR6 8.500 3077.0 LSND 10.10 44.0 9.3 500 3.8 2.080 .840 2.120 1.550 65.0 170.0 65.0 65.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S-42 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 2 RPX MWD 68 3 RPS MWD 68 4 RPM MWD 68 5 RPD MWD 68 '6 FET MWD 68 7 ROP MWD 68 1 AAPI 4 1 OHMM 4 1 OHMM 4 1 OHMM 4 1 OHMM 4 1 HR 4 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 43 Tape File Start Depth = 10060.000000 Tape File End Depth = 9400.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 103674 datums Tape Subfile: 6 108 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9985.0 EWR4 9966.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10199.0 10179.0 17-APR-96 MSC VER 1.32 / ISC VER 2.11 NGP VER 5.74 / SP4 VER 5.01 MEMORY 10261.0 10047.0 10261.0 0 47.9 58.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ TOOL NUMBER P0519CR6 P0519CR6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 3077.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OMMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.40 46.0 9.5 600 3.8 2.020 .880 1.300 1.530 66.0 165.0 66.0 66.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 7. $ : BP EXPLORATION (ALASKA) : S-42 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 21 Tape File Start Depth = 10261.000000 Tape File End Depth = 9950.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 31542 datums Tape Subfile: 7 86 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 8 is type: LIS 97/ 1/24 O1 **** REEL TRAILER **** 97/ 1/27 O1 Tape Subfile: 8 2 records... MinimUm record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 27 JAN 97 8:45a Elapsed execution time = 3.40 seconds. SYSTEM RETURN CODE = 0