HomeMy WebLinkAbout221-106From:Morgan, Kirk A (DNR)
To:Guhl, Meredith D (OGC)
Cc:Heusser, Heather A (DNR); Clifton, Sean C (DNR)
Subject:Theta West
Date:Thursday, May 23, 2024 1:42:08 PM
The Division of Oil & Gas has not received a request for confidentiality extension for the Theta
West well.
Kirk A. Morgan
Petroleum Geophysicist
Resource Evaluation Section Manager
State of Alaska
Department of Natural Resources
Division of Oil and Gas
550 W. 7th Ave. Suite 1100
Anchorage, AK 99501
Phone; 907-269-0135
Email; kirk.morgan@alaska.gov
From:Morgan, Kirk A (DNR)
To:Guhl, Meredith D (OGC); Clifton, Sean C (DNR)
Cc:Heusser, Heather A (DNR)
Subject:RE: Wells to be released?
Date:Wednesday, May 22, 2024 9:24:48 AM
Meredith
DOG has not received extended confidentiality requests for Talitha A or Theta West.
Extended confidentiality has be requested for Whiskey Gulch 14. That application is currently under
review.
Kirk
Kirk A. Morgan
Petroleum Geophysicist
Resource Evaluation Section Manager
State of Alaska
Department of Natural Resources
Division of Oil and Gas
550 W. 7th Ave. Suite 1100
Anchorage, AK 99501
Phone; 907-269-0135
Email; kirk.morgan@alaska.gov
From: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov>
Sent: Monday, May 20, 2024 7:59 AM
To: Morgan, Kirk A (DNR) <kirk.morgan@alaska.gov>
Cc: Heusser, Heather A (DNR) <heather.heusser@alaska.gov>
Subject: Wells to be released?
Hi Kirk,
I have several people repeatedly requiring about Whiskey Gulch 14, Talitha A, and Theta West data.
Any updates on whether the data can be released?
Thanks,
Meredith
Meredith Guhl (she/her)
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
meredith.guhl@alaska.gov
Direct: (907) 793-1235
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and
Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain
confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or
federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that
the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov.
From:Guhl, Meredith D (OGC)
To:Morgan, Kirk A (DNR)
Cc:Heusser, Heather A (DNR)
Subject:Theta West 1, PTD 221-106, Extended Confidentiality Requested?
Date:Thursday, May 16, 2024 7:46:00 AM
Good Morning Kirk,
Theta West 1, drilled by Great Bear Pantheon, is due for release after May 16, 2024. Has Great
Bear requested extended confidentiality for this well?
Thanks,
Meredith
Meredith Guhl (she/her)
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
meredith.guhl@alaska.gov
Direct: (907) 793-1235
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska
Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It
may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such
information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without
first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl
at 907-793-1235 or meredith.guhl@alaska.gov.
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-223-20036-00-00Well Name/No.THETA WEST 1
Completion Status P&ACompletion Date 4/16/2022
Permit to Drill 2211060 Operator Great Bear Pantheon, LLC
MD 8450 TVD 8448 Current Status P&A
5/22/2024
UIC No
Well Log Information:
Digital
Med/Frmt ReceivedStart Stop
OH /
CH Comments
Log
Media
Run
No
Electr
Dataset
Number Name
Interval
List of Logs Obtained:mud, GR/RES/NEU/DEN, SonicScan/CBL-VDL-MSIP; GR/HNGS/CAL; CBL; USIT-CBL-VDL
YesYes NoMud Log Samples Directional Survey
REQUIRED INFORMATION
(from Master Well Data/Logs)
DATA INFORMATION
Log/
Data
Type
Log
Scale
DF 4/28/2022350 8450 Electronic Data Set, Filename: Theta West
1_DM_Depth_350-8450ft RM.las
36493ED Digital Data
DF 4/28/2022194 8450 Electronic Data Set, Filename: Theta West
1_DM_Time_RM.las
36493ED Digital Data
DF 4/28/2022350 8450 Electronic Data Set, Filename: Theta West
1_VISION Service_350-8450ft RM.las
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_DM_Depth_Run01.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_DM_Depth_Run02.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_DM_Depth_Run03.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_DM_Time_Run01.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_DM_Time_Run02.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_DM_Time_Run03.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: EOWR_O.1009195.04_Great
Bear Theta West #1.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West #1 EOW Letter.doc36493EDDigital Data
DF 4/28/2022 Electronic File: Theta West #1 EOW Letter.pdf36493EDDigital Data
DF 4/28/2022 Electronic File: PvA - Letter Plot - Theta West #1
ASP Final Survey.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West #1 ASP Final
Definitive Survey Signoff SLB Signed.pdf
36493ED Digital Data
Wednesday, May 22, 2024AOGCC Page 1 of 4
Theta West,
1_VISION Service_350-8450ft RM.las
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-223-20036-00-00Well Name/No.THETA WEST 1
Completion Status P&ACompletion Date 4/16/2022
Permit to Drill 2211060 Operator Great Bear Pantheon, LLC
MD 8450 TVD 8448 Current Status P&A
5/22/2024
UIC No
DF 4/28/2022 Electronic File: Theta West 1 ASP Final Survey
NAD27.xlsx
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West 1 ASP Final Survey
NAD27_Signed.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: PrintSurveyList.csv36493EDDigital Data
DF 4/28/2022 Electronic File: PrintSurveyList.pdf36493EDDigital Data
DF 4/28/2022 Electronic File: Theta West 1_VISION
Service_350-8450ft.dlis
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_VISION_Service_2MD_8450ft_RM.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_VISION_Service_2TVD_8450ft_RM.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_VISION_Service_5MD_8450ft_RM.pdf
36493ED Digital Data
DF 4/28/2022 Electronic File: Theta West
1_VISION_Service_5TVD_8450ft_RM.pdf
36493ED Digital Data
DF 4/28/2022347 8450 Electronic Data Set, Filename: Theta west
1_Depth LAS_346-8450 ft.las
36494ED Digital Data
DF 4/28/2022 Electronic File: Theta West 1_50-223-20036-00-
00_FWR.pdf
36494ED Digital Data
DF 4/28/2022 Electronic File: Theta West 1_Drilling Log 5
inch_02102022.pdf
36494ED Digital Data
DF 4/28/2022 Electronic File: Theta West 1_Master Log 5
inch_02102022.pdf
36494ED Digital Data
DF 4/28/2022 Electronic File: Great_Bear_Theta
West_Run_1_HNGS-USIT-CBL_MainLog_22-
Feb-2022.dlis
36495ED Digital Data
DF 4/28/2022 Electronic File: Great_Bear_Theta
West_Run_1_HNGS-USIT-CBL_RepeatPass_22-
Feb-2022.dlis
36495ED Digital Data
DF 4/28/2022 Electronic File: Great_Bear_Theta
West_Run_2_MSIP-USIT-CBL-
VDL_RepeatPass_27-Feb-2022.dlis
36495ED Digital Data
DF 4/28/2022 Electronic File: Great_Bear_Theta
West_Run_2__MSIP-USIT-CBL-
VDL_MainLog_27-Feb-2022 (2).dlis
36495ED Digital Data
Wednesday, May 22, 2024AOGCC Page 2 of 4
Theta west,
1_Depth LAS_346-8450 ft.las
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-223-20036-00-00Well Name/No.THETA WEST 1
Completion Status P&ACompletion Date 4/16/2022
Permit to Drill 2211060 Operator Great Bear Pantheon, LLC
MD 8450 TVD 8448 Current Status P&A
5/22/2024
UIC No
Well Cores/Samples Information:
ReceivedStart Stop Comments
Total
Boxes
Sample
Set
NumberName
Interval
DF 4/28/2022 Electronic File:
Great_Bear_Theta_West_Run_1_Spectral_Gam
ma_Ray_Field_Print_22-Feb-2022.PDF
36495ED Digital Data
DF 4/28/2022 Electronic File:
Great_Bear_Theta_West_Run_2_Sonic_Scanner
_Field_Print_27-Feb-2022.Pdf
36495ED Digital Data
DF 4/28/2022 Electronic File: Great_Bear_Theta
West_Run_1_Cement_Bond_Log_Field_Print_22
-Feb-2022.PDF
36495ED Digital Data
DF 4/28/2022 Electronic File: Great_Bear_Theta
West_Run_2_Cement_Bond_Log_Field_Print_27
-Feb-2022.PDF
36495ED Digital Data
DF 4/28/2022 Electronic File: GBP FINAL_Flowing Report
THETA 1.pdf
36496ED Digital Data
DF 4/28/2022 Electronic File: GBP FINAL_Flowing Report
THETA 1.xlsm
36496ED Digital Data
DF 4/28/2022 Electronic File: List of Form & Geological
Markers_TW.xlsx
36497ED Digital Data
DF 4/28/2022 Electronic File: Theta West #1 GMR.xlsm36497EDDigital Data
DF 4/28/2022 Electronic File: Theta West FracCADE Report
Stage 1-3 20220304.pdf
36498ED Digital Data
DF 4/25/2024 Electronic File: Great Bear_Theta West Stage 1
Post Job report.pdf
38741ED Digital Data
DF 4/25/2024 Electronic File: Great Bear_Theta West Stage 2
Post Job Report.pdf
38741ED Digital Data
DF 4/25/2024 Electronic File: Great Bear_Theta West Stage 3
Post Job Report.pdf
38741ED Digital Data
DF 5/21/2024 Electronic File: GBPan
Transmittal_TW_Geochemical_2022_dated 5-21-
24.pdf
38828ED Digital Data
DF 5/21/2024 Electronic File: Theta West_AS0498-0504
Geochemical Summary Sheets.pdf
38828ED Digital Data
2/14/2022360 8452 14 1800Cuttings
Wednesday, May 22, 2024AOGCC Page 3 of 4
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-223-20036-00-00Well Name/No.THETA WEST 1
Completion Status P&ACompletion Date 4/16/2022
Permit to Drill 2211060 Operator Great Bear Pantheon, LLC
MD 8450 TVD 8448 Current Status P&A
5/22/2024
UIC No
INFORMATION RECEIVED
Completion Report
Production Test Information
Geologic Markers/Tops
Y
Y / NA
Y
Comments:
Compliance Reviewed By:Date:
Mud Logs, Image Files, Digital Data
Composite Logs, Image, Data Files
Cuttings Samples
Y / NA
Y
Y / NA
Directional / Inclination Data
Mechanical Integrity Test Information
Daily Operations Summary
Y
Y / NA
Y
Core Chips
Core Photographs
Laboratory Analyses
Y / NA
Y / NA
Y / NA
COMPLIANCE HISTORY
Date CommentsDescription
Completion Date:4/16/2022
Release Date: 5/16/2024
Wednesday, May 22, 2024AOGCC Page 4 of 4
M.Guhl 5/22/2024
Date: 05/21/2024
To: Alaska Oil & Gas Conservation Commission
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL: CONFIDENTIAL
Well: Theta West
PTD: 221-106
API: 50-223-20036-00-00
Geochemical Summary – (2022)
Great Bear Panth – AOGCC > Theta West > Well Completion or Recompletion, Log > Geochemical Summary (2022)
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
221-106
T38828
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2024.05.21 14:03:08 -08'00'
Date: 04/25/2024
To: Alaska Oil & Gas Conservation Commission
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL: CONFIDENTIAL
Well: Theta West
PTD: 221-106
API: 50-223-20036-00-00
Post Job FracCAT Reports – Stage 1-3 (2022)
Great Bear Panth – AOGCC > Theta West > Well Completion or Recompletion, Log > Frac Treatment (2022)
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
221-106
T38741
Meredith Guhl Digitally signed by Meredith Guhl
Date: 2024.04.25 09:03:21 -08'00'
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Regg, James B (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: Theta West #1 (PTD 2211060)
Date:Wednesday, September 21, 2022 2:39:59 PM
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: Regg, James B (OGC) <jim.regg@alaska.gov>
Sent: Wednesday, September 21, 2022 2:39 PM
To: Patrick Galvin <pat@greatbearpetro.com>
Cc: DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov>
Subject: RE: Theta West #1 (PTD 2211060)
Trip to Theta West #1 in conjunction with trio to Talitha A would work.
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: Patrick Galvin <pat@greatbearpetro.com>
Sent: Wednesday, September 21, 2022 2:16 PM
To: Regg, James B (OGC) <jim.regg@alaska.gov>
Subject: Re: Theta West #1 (PTD 2211060)
Yes, the site has been thoroughly cleaned since the visit. When we received a report from DNR’s visit
the next day that debris remained on the site we sent a new crew to do a full new clean up. We have
been assured that the site is now clean.
As for the gravel mound, we intentionally left it that high anticipating subsidence over the next
couple years. This site was P&A’d this April, so it hasn’t gone through even a single full season of
subsidence. Our goal is to leave a small mound, and avoid any ponding at the well location. We
believe that this mound will sink to become a small mound.
Please let me know what we can do to attempt site clearance this season. Perhaps the inspector,
when he goes out to Talitha A can take a further trip out to Theta West? Thanks.
-Pat
Patrick Galvin
Chief Commercial Officer & General Counsel
Great Bear Pantheon
3705 Arctic Blvd, Suite 2324
Anchorage, AK 99503
Main: (907) 868-8070
Mobile: (907) 575-8914
Fax: (907) 868-3887
From: Regg, James B (OGC) <jim.regg@alaska.gov>
Date: Wednesday, September 21, 2022 at 12:12 PM
To: Patrick Galvin <pat@greatbearpetro.com>
Subject: Theta West #1 (PTD 2211060)
There was debris at the location. Inspector report attached. The gravel/dirt mount over the well is
ok. Has there been anyone back to clean up debris found at the Theta West #1 location?
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
CAUTION - EXTERNAL EMAIL: This email originated from outside of your organization. Do not click
links or open attachments unless you recognize the sender and know the content is safe.
2023-0920_Location_Theta-West-1_gc
Page 1 of 6
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE: 9/20/2023
P. I. Supervisor
FROM: Guy Cook SUBJECT: Site Clearance
Petroleum Inspector Theta West 1
Great Bear Pantheon
PTD 2211060; Sundry 322-155
9/20/23: Traveled to the Theta West 1 location via helicopter with Pollux Aviation to the
coordinates povided by Patrick Galvin (Great Bear Pantheon). There was no
representative from Great Bear. At the Theta West #1 drill site there was obvious
debris left at location scattered around the plugged and abandoned well. The debris
found at location included, an empty snack container, various small pieces of plastic, a
large piece of visqueen, scrap paper, what appeared to be some kind of warning label,
and some pieces of scrap wood. This is an improvement from my visit last year but still
not adequate to grant site clearance.
The gravel fill placed on top of the abandoned well had settled quite a bit since last
year’s visit. Around the gravel fill is a large area of mud.
I informed Mr. Galvin that the debris needed to be cleaned up. He informed me it would
happen today. I asked for pictures of the debris gathered to be sent to me so I may give
them their site clearance. The pictures were sent to me, and I am satisfied that the
Theta West 1 location is cleaned up.
Attachments: Photos (9)
jbr
2023-0920_Location_Theta-West-1_gc
Page 2 of 6
Location Inspection – Theta West 1 (PTD 2211060)
Photos by AOGCC Inspector G. Cook (except as noted)
9/20/2023
2023-0920_Location_Theta-West-1_gc
Page 3 of 6
2023-0920_Location_Theta-West-1_gc
Page 4 of 6
2023-0920_Location_Theta-West-1_gc
Page 5 of 6
2023-0920_Location_Theta-West-1_gc
Page 6 of 6
Debris collected from Theta West 1 drillsite;
photo courtesy of Great Bear Pantheon
2022-0820_Location_ThetaWest -1_gc
Page 1 of 6
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO:Jim Regg DATE:8/20/2022
P. I. Supervisor
FROM:Guy Cook SUBJECT:Location Inspection
Petroleum Inspector Theta West #1
Great Bear Pantheon
PTD 2211060; Sundry 322-155
8/19/2022:Flew out to location via helicopter with Pollux Aviation to the coordinates
given to us by Patrick Galvin (Great Bear Pantheon). At the Theta West #1 drill site
there was obvious debris left at location scattered around the plugged and abandoned
well. Absorbent, plastic “zip-lock” bag, delineators and rags are just a few examples of
the debris found.
The gravel fill placed on top of the abandoned well seems excessively high. Around the
gravel fill is a large area of mud.
The area needs to be cleaned up before a site clearance can be given.
Attachments:Photos (10)
9
James B. Regg Digitally signed by James B. Regg
Date: 2022.09.21 12:04:49 -08'00'
2022-0820_Location_ThetaWest -1_gcPage 2 of 6Location Inspection – Theta West #1 (PTD 2211060)Photos by AOGCC Inspector G. Cook8/20/2022
2022-0820_Location_ThetaWest -1_gcPage 3 of 6
2022-0820_Location_ThetaWest -1_gcPage 4 of 6
2022-0820_Location_ThetaWest -1_gcPage 5 of 6
2022-0820_Location_ThetaWest -1_gcPage 6 of 6
1a. Well Status:Oil SPLUG Other Abandoned Suspended
1b. Well Class:
20AAC 25.105 20AAC 25.110 Development Exploratory
GINJ WINJ WDSPL No. of Completions: ___________________ Service Stratigraphic Test
2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry:
Aband.:
3. Address: 7. Date Spudded: 15. API Number:
4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number:
Surface:
Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s):
GL: 210' BF:
Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation:
4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number:
Surface: x- y- Zone- 4
TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD:
Total Depth: x- y- Zone- 4
5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD:
Submit electronic information per 20 AAC 25.050 (ft MSL)
22. Logs Obtained:
23.
BOTTOM
9 5/8" L-80 3,164'
5 1/2" P-110 6,430'
3 1/2" L-80 Packer: 7,033
3 1/2" L-80 Liner: 8,277'
24. Open to production or injection? Yes No 25.
26.
Was hydraulic fracturing used during completion? Yes No
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27.
Date First Production: Method of Operation (Flowing, gas lift, etc.):
Hours Tested: Production for Gas-MCF:
Test Period
Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr):
Press. 24-Hour Rate
Sr Res EngSr Pet GeoSr Pet Eng
Variable
Exploration
36-39
Oil-Bbl: Water-Bbl:
57
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray,
caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation
record. Acronyms may be used. Attach a separate page if necessary
00
7,770'-7,780'
7,590'-7,600'
Gas Lift
Stage 1 - Top: 8,065' MD; Bottom: 8,075' MD; Shot Density: 6ft; Number: 60,
Diameter: 0.28"; Date: 3/8/22
Stage 2 - Top: 7,745' MD; Bottom: 7,755' MD; Shot Density: 6ft; Number: 60;
Diameter: 0.28"; Date: 3/16/22
Stage 3 - Top: 7,595' MD; Bottom: 7,605' MD; Shot Density: 6ft, Number: 60;
Diameter: 0.28"; Date: 3/17/22
99
Gas-Oil Ratio:Choke Size:
0150 0
3/20/2022 43
Flow Tubing
4167
0
280,935 lbs. of Sand 40/70 / 57,812 gals of WF110; 70,502
gals of YF118FlexD
71,388 lbs. of CarboLite 20/40; 143,297 lbs. of Sand 40/70 /
53,7287 gals of WF115; 64,302 gals of YF115FlexD
8,070'- 8,080'45,984 lbs. of CarboLite 20/40; 198,547 lbs. of Sand 40/70 /
62,790 gals of WF115; 76,104 gals of YF115FlexD
Water-Bbl:
PRODUCTION TEST
3/20/2022
Date of Test: Oil-Bbl:
Per 20 AAC 25.283 (i)(2) attach electronic information
9.2 lb/ft
Liner: 8,277'
Packer: 7,026'
Liner: 7,033'
40 lb/ft
17 lb/ft
3,164'
Packer: 7,026' Packer: 7,033'
CASING WT. PER
FT.GRADE
9.2 lb/ft
569,801.86
569781.92
TOP
SETTING DEPTH MD
TOC
Liner: 7,033'
TOP
TOC
TOC
569,861.19 5,817,637.76
456.2’ FSL, 2,388.9’’ FWL, S32 T7N R11E UM
2/8/2022
CEMENTING RECORD
5,817,647.70
1385'
SETTING DEPTH TVD
5817667.09
Pending
1/22/2022
8450' / 8,448.90'
8376' / 8,374.8'
240'
HOLE SIZE AMOUNT
PULLED
MudLogs; Quad Combo: GR/RES/NEU/DEN; Sonic Scanner_CBL-VDL-MSIP; GR_HNGS-CAL; Cement Bond Log_USIT-CBL-VDL
3705 Arctic Blvd., Ste 2324, Anchorage, AK 99503
4/16/2022
50-223-20036-00-00
Theta West #1
ADL 394039
474.5’ FSL, 2,369.2’ FWL, S32 T7N R11E UM
444.4’ FSL, 2,448.1’ FWL, S32 T7N R11E UM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Great Bear Pantheon, LLC
WAG
Gas
221-106; 322-155; 322-113; 322-088
12 1/4"
BOTTOM
6,403'5-1/2"
SIZE DEPTH SET (MD)
7,033'
PACKER SET (MD/TVD)
TUBING RECORD
TOC 6,430'
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
CASING, LINER AND CEMENTING RECORD
List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion,
to production or injection? YesNo25.
26.
Was hydraulic fracturing used during completion?YesNo
Top: 8,065' MD; Bottom: 8,075' MD; Shot Density: 6ft; Number: 60,
0.28"; Date: 3/8/22
Top: 7,745' MD; Bottom: 7,755' MD; Shot Density: 6ft; Number: 60;
028"; Date: 3/16/22
6,403'5-1/2"
SIZE DEPTH SET (MD)
TUBING RECORD
t each interval open (MD/TVD of Top and Bottom; Perforation
Number; Date Perfd):
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
7,033'
PACKER SET (MD/TVD)
Liner: 8,277'L-80
Packer: 7,033L-80
6,430'OCOCP-110
3,164'12 1/4"OCL-80
AMOUNT
PULLEDBOTTOMCEMENTINGRECORDSETTING DEPTH TVD HOLE SIZETOPTOP
SETTING DEPTH MD
BOTTOM
WT.PER
FT.GRADE
CASING, LINER AND CEMENTING RECORD
Obtained:
on, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log,spontaneous potential,gamma ray,
esistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation
Acronyms may be used. Attach a separate page if necessary
Quad Combo: GR/RES/NEU/DEN; Sonic Scanner_CBL-VDL-MSIP; GR_HNGS-CAL; Cement Bond Log_USIT-CBL-VDL
List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion,
onal or Inclination Survey: Yes (a(((((((ttached) No 13. Water Depth, if Offshore:21. Re-drill/Lateral Top Window MD/TVD:
t electronic information per 20 AAC 25.050 (ft MSL)
on of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number:
x- y- Zone- 4
x-y- Zone- 4 12. SSSV Depth MD/TVD:20. Thickness of Permafrost MD/TVD:
th: x-y- Zone- 469 81 92
y-y-
1385'81 66 09
Pending8450' / 8,448.90'
on of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number:
oductive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s):
GL: 210' BF:
th: 10. Plug Back Depth MD/TVD: 18. Property Designation:
Exploration456.2’ FSL, 2,388.9’’ FWL, S32 T7N R11E UM
2/8/2022
8376' / 8,374.8'
Theta West #1
ADL 394039
444.4’ FSL, 2,448.1’ FWL, S32 T7N R11E UM
s: 7. Date Spudded: 15. API Number:
1/22/2022ic Blvd., Ste 2324, Anchorage, AK 99503 50-223-20036-00-00
or Name: 6. Date Comp., Susp.,or 14. Permit to Drill Number / Sundry:
Aband.:4/16/2022ar Pantheon, LLC 221-106; 322-155; 322-113; 322-088
Status:OilSPLUG OtherAbandoned Suspended 1b. Well Class:
20AAC 25.105 20AAC 25.110 Development Exploratory
WINJ WDSPLNo. of Completions: _____________________ Service Stratigraphic Test
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
By Meredith Guhl at 3:35 pm, Jun 16, 2022
Abandoned
4/16/2022
MDG
RBDMS 6/16/2022 MDG
GCDW 04/25/2024
SFD 8/3/2022 DSR-10/25/22VTL 4/23/2024
Conventional Core(s) Yes No Sidewall Cores:
30.
MD TVD
580' 340'
700' 460'
1,318' 1,078'
3,451' 3,211'
3,802' 3,562'
4,323' 4,083'
5,431' 5,191'
T. SMD / K-10 5,610' 5,370'
T. Hue Shale tongue 7,083' 6,843'
7,141' 6,901'
7,216' 6,976'
T. Lower Fan 7,432' 7,192'
Canning Formation 7,915' 7,914'
8,032' 7,792'
Seabee/Torok undifferentiated:8,450' 8,448'
31. List of Attachments:
Surface Abandonment
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Michael Duncan Contact Name: Michael Duncan
COO Contact Email:michael@greatbearpetro.com
Authorized Contact Phone:817.240.3865
General:
Item 1a:
Item 1b:
Item 4b:
Item 9:
Item 15:
Item 19:
Item 20:
Item 22:
Item 23:
Item 24:
Item 27:
Item 28:
Item 30:
Item 31:
This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic
diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory
analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
INSTRUCTIONS
Authorized Title:
Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other
Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey,
and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show
the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately
produced, showing the data pertinent to such interval).
Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071,
submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to:
porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of
completion, suspension, or abandonment, whichever occurs first.
FORMATION TESTS
Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
MFS / Dkr D/ Middle Schrader
T. Upper Schrader Bluff
T. Upper Submarine Fan
T. Canning Fm.
T. Torok (?)
Base of Permafrost:
T. West Sak
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this
form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
Yes No
Well tested? Yes No
28. CORE DATA
If yes, list intervals and formations tested, briefly summarizing test results.
Attach separate pages to this form, if needed, and submit detailed test
information, including reports, per 20 AAC 25.071.
NAME
T. Sagavanirktok
T. Ugnu
29. GEOLOGIC MARKERS (List all formations and markers encountered):
Theta West
Basin Floor Fan
On March 8th, the Basin Floor Fan formation was perforated from 8065’-8075’ with 2 ½”
HSD charges at 6 SPF and 60 deg phasing. A single stage frac stimulation job pumped
78,485 gals of YF120FlexD fluid, 198,547 lbs of 40/70 White proppant, & 45,984 lbs of
20/40 CarboLite proppant into this interval. The well was then shut in & prepared at
surface for Wireline operations on the 2nd interval within the Basin Floor Fan. On March
16th a composite frac plug was set at 7900’ and the 2nd interval within the Basin Floor
Fan was perforated from 7745’-7755’with 2 1/2’ HSD charges at 6 SPF and 60 deg
phasing. A single stage frac stimulation job pumped 67,230 gals of YF115FlexD fluid,
143,297 lbs of 40/70 White proppant, & 71,388 lbs of 20/40 CarboLite proppant into this
interval. The well was then shut in & prepared at surface for Wireline operations on the 3rd
interval within the Basin Floor Fan. On March 17th, a composite frac plug was set at 7700’
and 3rd interval within the Basin Floor Fan formation was perforated from 7595’-7605’ with
2 1/2’ HSD charges at 6 SPF and 60 deg phasing. A final single stage frac stimulation job
pumped 70,501 gals of YF115FlexD fluid, 280,935 lbs of 40/70 White proppant into this
interval.
Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS
12345), and/or Easement (ADL 123456) number.
B. Upper Submarine Fan/ T.
TPI (Top of Producing Interval).
Authorized Name:
No. 22. Logs Obtained; No. 30: Formation Tests; Daily Operations; Completion Reports; Frac Treatment Reports; Surveys; Wellbore Schematics;
The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth
measurements given in other spaces on this form and in any attachments.
The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Signature w/Date:
Well tested? Yes NoTVD
30.FORMATION TESTSs encountered)
), and summarize lithology and presence of oil, gas or wate
otographs, and all subsequent laboratory analytical results
No Sidewall Cores: Yes No
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
2022.06.09 13:20:00
-08'00'
Top of productive interval: 7,500' 7,549'
22
Theta West
Type of Log Depth Start Stop Format
LWD Logs
End of Well Letter pdf
End of Well Report pdf
FinalDefinitiveSurvey
PvA - Letter Plot - Theta West #1 ASP Final Survey pdf
Theta West #1 ASP Final Definitive Survey Signoff
SLB Signed pdf
Theta West 1 ASP Final Survey NAD27 excel
Theta West 1 ASP Final Survey NAD27_Signed pdf
PrintSurvey
Print Survey List pdf
Print Survey List excel
DrillingMechanicsDepth
Theta West 1_DM_Depth_350-8450ft RM 350' - 8,450' 2/8/2022 LAS
Theta West 1_DM_Depth_Run01 350' - 3,050' 1/22/2022 1/25/2022 pdf
Theta West 1_DM_Depth_Run02 3,050' - 7,470' 1/28/2022 2/5/2022 pdf
Theta West 1_DM_Depth_Run03 7,470' - 8,450' 2/6/2022 2/8/2022 pdf
DrillingMechanicsTime
Theta West 1_DM_Time_RM 194' - 8,450' 2/8/2022 LAS
Theta West 1_DM_Time_Run01 1/22/2022 1/25/2022 pdf
Theta West 1_DM_Time_Run02 1/28/2022 2/5/2022 pdf
Theta West 1_DM_Time_Run03 2/6/2022 2/8/2022 pdf
Vision_RM
Theta West 1_VISION Service_350-8450ft 350'-8,450' DLIS
Theta West 1_VISION Service_350-8450ft RM 350'-8,450' 2/8/2022 LAS
Theta West 1_VISION_Service_2MD_8450ft_RM 350'-8,450' 1/22/2022 2/8/2022 pdf
Theta West 1_VISION_Service_2TVD_8450ft_RM 350'-8,450' 1/22/2022 2/8/2022 pdf
Theta West 1_VISION_Service_5MD_8450ft_RM 350'-8,450' 1/22/2022 2/8/2022 pdf
Theta West 1_VISION_Service_5TVD_8450ft_RM 350'-8,450' 1/22/2022 2/8/2022 pdf
Wireline-Electric Logs
Cased Hole Logs
Great_Bear_Theta West_Run_1_HNGS-USIT-
CBL_MainLog_22-Feb-2022 DLIS
Great_Bear_Theta West_Run_1_HNGS-USIT-
CBL_RepeatPass_22-Feb-2022 DLIS
Great_Bear_Theta West_Run_2__MSIP-USIT-CBL-
VDL_MainLog_27-Feb-2022 (2)DLIS
Great_Bear_Theta West_Run_2_MSIP-USIT-CBL-
VDL_RepeatPass_27-Feb-2022 DLIS
Great_Bear_Theta_West_Run_1_Spectral_Gamma_
Ray_Field_Print_22-Feb-2022 5,365' - 8,282' 2/23/2022 2/23/2022 pdf
Logs Obtained
22 Logs Obtained
Great_Bear_Theta_West_Run_2_Sonic_Scanner_Fi
eld_Print_27-Feb-2022 4,442' - 7,751 2/28/2022 2/28/2022 pdf
CementBondLog
Great_Bear_Theta
West_Run_1_Cement_Bond_Log_Field_Print_22-
Feb-2022 5,365' - 8,282 2/23/2022 2/23/2022 pdf
Great_Bear_Theta
West_Run_2_Cement_Bond_Log_Field_Print_27-
Feb-2022 4,442' - 7,751 2/28/2022 2/28/2022 pdf
Mud Logs
Theta West Final Well Report pdf
Theta west 1_Depth LAS_346-8450 ft 346' - 8,450' 2/8/2022 LAS
Theta West 1_Drilling Log 5 inch_02102022 346' - 8,450' 2/10/2022 pdf
Theta West 1_Master Log 5 inch_02102022 346' - 8,450' 2/10/2022 pdf
30 FORMATION TESTS
The well was then shut in & prepared at surface for Coiled Tubing operations to test the whole Basin Floor Fan
interval. On March 19th, 2” Coiled tubing was rigged up and inserted into the well with a mill & motor to drill out
composite frac plugs and clean out the well to a depth of 8075’. Once cleaned out, Coiled Tubing retreated to
a depth of 5500’ & prepare for nitrogen lift. Halliburton N2 was rigged up to SLB Coiled Tubing & the well was
opened to the well test manifold on a 26/64” choke. Nitrogen lift was started at 400 scf/min & was kept at 400
scf/min over the course of the test. On March 19th at 7:30 pm, the well was flowing at 1200 psi on a 14/64”
adjustable choke with 400 scf/min N2 lift & delivering 3700 bwpd. Over the course of the test, from 3/19/22 to
3/22/22, the choke size was increased to 128/64”, FTP dropped from 1200 psi to 123 psi, and recovery rate
fell from 3700 bwpd to 480 bwpd. The test for the Basin Floor formation was ended at 10:30 am on 3/22/22
with the well producing 99 bbls of 36.7 API oil at a maximum rate of 148 bopd and 366 mscf of 0.84 gravity
gas. Total test time was 87 consecutive hours and total fluid recovered was 4294 bbls.
0
10
0
0
50
0
25
0
Fe
e
t
9
J
u
n
e
2
0
2
2
Jo
e
A
l
s
t
o
n
-
1
o
f
1
-
Gr
e
a
t
B
e
a
r
P
A
N
T
H
E
O
N
Th
e
t
a
W
e
s
t
#
1
Su
r
f
a
c
e
a
n
d
B
H
L
SE
C
T
I
O
N
3
2
,
T
7
N
,
R
1
1
E
UM
I
A
T
M
E
R
I
D
I
A
N
NA
D
2
7
Al
a
s
k
a
S
t
a
t
e
P
l
a
n
e
Z
o
n
e
4
50
0
75
0
10
0
0
Sc
a
l
e
31
33
5
29
30
28
6
4
32
Th
e
t
a
W
e
s
t
#
1
Su
r
f
a
c
e
PO
I
N
T
N
A
M
E
ST
A
T
E
P
L
A
N
E
CO
O
R
D
I
N
A
T
E
S
LA
T
I
T
U
D
E
(
D
D
)
LO
N
G
I
T
U
D
E
(
D
D
)
Su
r
f
a
c
e
x
=
5
6
9
,
8
6
1
.
1
9
y
=
5
,
8
1
7
,
6
3
7
.
7
5
69
.
9
1
2
1
0
7
2
°
14
9
.
4
4
4
6
7
6
0
°
TH
E
T
A
W
E
S
T
#
1
NA
D
2
7
A
l
a
s
k
a
S
t
a
t
e
P
l
a
n
e
Z
o
n
e
4
BH
L
x
=
5
6
9
,
7
8
1
.
9
2
y
=
5
,
8
1
7
,
6
6
7
.
0
8
69
.
9
1
2
1
8
9
3
°
14
9
.
4
4
5
3
0
3
9
°
24
4
8
F
T
F.
W
.
L
.
PO
I
N
T
N
A
M
E
ST
A
T
E
P
L
A
N
E
CO
O
R
D
I
N
A
T
E
S
SW
C
o
r
n
e
r
x
=
5
6
7
,
4
1
3
.
2
9
y
=
5
,
8
1
7
,
1
7
1
.
8
1
Se
c
t
i
o
n
3
2
,
T
7
N
R
1
1
E
Co
r
n
e
r
C
a
l
l
46
6
F
T
F.
S
.
L
.
SECTION 6.
WELLBORE SCHEMATIC
SECTION 6a.
WELLBORE SCHEMATIC
THETA WEST
Complete BFF Interval
ThetaWestͲWellboreSchematicͲCompleteBFFInterval
ConductorHole ConductorPipe
xxxxxx xxxxxxxxxxxxx Depth
SurfaceHole SurfaceCasing Grade Connection
40 lb/ft
PFDepth
ProductionCasing Weight
5.5" lb/ft
Grade:L80
HueShaleͲBottom@7420'
BFF#1Perfs:7595'Ͳ7605'
FracPlug@7685'
BFF#2Perfs:7745'Ͳ7755' BFFPerfs(6spf;60degphase;0.36"EHD)
FracPlug@8005'
BFF#1Perfs:8065'Ͳ8075'
HRZShaleͲTop@8410'PBTDͲ8376'
TDͲ8450'
3.5"LinerWeight:9.2lb/ft
PackerTopͲ7026' LinerTopͲ7033'
PackerBottomͲ7033' LinerEndͲ8277'
Grade TOC
17 PͲ110 6430'
BTC
TOC Depth
Surface 3164' ~1500'
LͲ80
Weight
121/4" 95/8"
TOC
PF PF Surface 75'
Weight
28" 20" 129lb/ft
SECTION 6b.
WELLBORE SCHEMATIC
THETA WEST
Final P&A
ThetaWestͲWellboreSchematicͲFinalP&A *Diagramsarenottoscale*
Cementplug:200'toSurface
ConductorHole ConductorPipe
xxxxxx xxxxxxxxxxxxx Depth
Cementplug:3064'(calc)'Ͳ3264'(6bbls)
SurfaceHole SurfaceCasing Grade Connection
40 lb/ft
PFDepth
ProductionCasing Weight
5.5" lb/ft
Grade:L80
Cementplug:6876'(calc)'Ͳ7545'(13bbls)
CIBPͲ7545'
HueShaleͲBottom@7420'
BFF#1Perfs:7595'Ͳ7605'
FracPlug@7685'
BFF#2Perfs:7745'Ͳ7755' BFFPerfs(6spf;60degphase;0.36"EHD)
FracPlug@8005'
BFF#1Perfs:8065'Ͳ8075'
HRZShaleͲTop@8410'
Weight
28" 20" 129lb/ft
TOC
PF PF Surface 75'
Weight
Depth
Surface 3164'
PBTDͲ8376'
XXXX
121/4" 95/8" LͲ80 BTC
TOC
3.5"LinerWeight:9.2lb/ft
PackerTopͲ7026' LinerTopͲ7033'
PackerBottomͲ7033' LinerEndͲ8277'
Grade TOC
17 PͲ110
~1500'
Casing&95/8"Annulus
TDͲ8450'
6430'
SECTION 2.
Daily Drilling Reports
1
Phone 1 1.17.22
Phone 2 Tool Pusher (N): 5
API No: PTD: Field:
ft
ft
30.3
P.B.T.D.:
From To Hrs
6:00 17:00 11:00 2
17:00 6:00 13:00 2
0:00
0:00 0:00
0:00 0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
14 19 Rig:
14 20 Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith (907) 529-0737 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/17/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
1/10/22
Actual Depth: 75'Last Evac Drill: NA
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Perform rig maintenande on pad, Cleaning pits, waiting on conductor and cellar to be installed.Phase: 0
Wind Speed: 5 to 10
24 hour Summary:Release F/ Talitha well @ 05:00, Move rig down ice road to Theta West drill site.
Weather
Gen Conditions: Fair
Shoe Test: N/A
HSE Events:None, IFO PM Temp: -27
Operational Details (06:00 - 06:00)
Continue moving rig 1 mile F/Talitha location - T/Theta West location
24 hour Forecast:Set conductor, install cellar, move rig over well, rig up rig, rig up diverter, function test
Wind Direction: W
AM Temp: -24
Set down rig on pad continue to clean pits, perform rig maintenance as conductor and cellar not set. Unload 1 trailer of 7" casing.
Cleaning Nordic cuttings box.
*Conductor auger drill and crane unable to work due to cold -40 temps. Installing coms in camp
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
44 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
45 Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
Total Length (ft): 0.00
2
Phone 1 1.18.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
ft
ft
P.B.T.D.:
From To Hrs
6:00 18:00 12:00 2
18:00 6:00 12:00 2
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
14 19 Rig:
14 20 Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
AZ.Item Comment
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
45 Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
44 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Perform rig maintenance on pad, Cleaning pits, Checking pipe handling equipment slips, elevators, rig tongs, collar slips, dog collar
clamp. Thourough top drive service.
Load 105 joints of 4" 15.7# XT-39, rabbit, strap, tally in pipe shed. Continue to clean trough under augur.Adjust top drive torque, set to
17,500 ft/lbs.
* Diverter test Witness notifications sent 1/17/2022 @ 13:20
HSE Events:None, IFO PM Temp: -17
Operational Details (06:00 - 06:00)
Drill and set conductor,Rig doing Preventitive maintenance , Cleaning pits,
24 hour Forecast:Install cellar, move rig over well, Rig up diverter, function test.
Wind Direction: W
AM Temp: -20
Ops @ 06:00 hrs: Perform rig maintenance on pad, Cleaning pits.Phase: 0
Wind Speed: 10 t0 15
24 hour Summary:Rigging up.
Weather
Gen Conditions: Fair
Shoe Test: N/A
1/10/22
Actual Depth: 75'Last Evac Drill: NA
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/17/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date:
Supervisor (N): Paul Smith / Robert Wall (907) 529-0737 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
3
Phone 1 1.19.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
ft
ft
P.B.T.D.:
From To Hrs
6:00 12:00 6:00 2
12:00 18:00 6:00 2
18:00 24:00 6:00 2
24:00 6:00 6:00 2
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
14 19 Rig:
14 20 Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/18/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
1/10/22
Actual Depth: 75'Last Evac Drill: NA
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Load 18jts 4" HWDP for spud. Check all pressures in tires for move.Phase: 0
Wind Speed: 10 to 15
24 hour Summary:Pick up 3 stands of 4" XT39 DP and stand back. Remove workover cuttings chute. Install drilling cuttings chute.
Weather
Gen Conditions: Breezy, clear
Shoe Test: N/A
HSE Events:No incidents, accidents, or spills. PM Temp: -17
Operational Details (06:00 - 06:00)
Prepare handling equipment to pick up stands of 4" XT 39 and rack back in derrick. Clean pit #1, and trough. Stand back 5 stands,
473.77'. Electrician serviced all gaitronic phone sets.
24 hour Forecast:Install corrugated cellar box , move rig over well, Rig up diverter, function test.
Wind Direction: W
AM Temp: -20
Complete picking up 3313.48' of 4" XT 39 DP. 35 stands total. Loader operator staging equipment from Talitha to Theta.
Ongoing operation of clearing solids from cuttings chute. Service lo torque floor valves, warm up moving system, and rolling tires.
Remove workover cuttings chute, and lay down using manlift and loader. Complete cleaning augur chute.
Downward pressure mechanism failed on Watson boring machine. Conductor 20" pipe installed and cemented, 80 feet in length. Cellar
box excavation delayed. Machine departed to Deadhorse.
Begin to install Y shape drilling cuttings chute using manlift and loader.
* Diverter test Witness notifications sent 1/17/2022 @ 13:20, and updated via email 18:00 hrs 1.18.22.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
44 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
45 Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
Total Length (ft): 0.00
4
Phone 1 1.20.22
Phone 2 Tool Pusher (N): 37
API No: PTD: Field:
ft
ft
30.0
P.B.T.D.:
From To Hrs
6:00 12:00 6:00 2
12:00 18:00 6:00 2
18:00 24:00 6:00 2
24:00 6:00 6:00 2
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
14 19 Rig:
14 20 Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 96 1
2 Triplex 5.5 60 96 2
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
AZ.Item Comment
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
45 Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
44 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Complete install of SLB transducer. MWD tools loaded in pipe shed. Rig received 62 bbls water. Circulate 45 bbls pit to pit, test all
valves.Good. Keep moving system hydraulics warm, roll tires. Electrician serviced SCR #2.
Lay out herculite for rig foot print. Position initial T rig mats for sub base around cellar. Follow with row of 40 foot mats for rig module.
Place transition for walking rig up on mats, use 2 x 12's, and 3 x 12's.
With welders measure 11" below top of rig mat for conductor cut off. Level and install load ring. Preheat to 250°, fillet weld load ring.
Post heat to 900°, wrap load rig. SIMOPS: Rig prepared for move. PJSM, move rig to line up and center over 20" conductor. Installed 4"
nipples in cellar for cement job. Rig in place and level.
* Diverter test Witness notifications sent 1/17/2022 @ 13:20. AOGCC Inspector Adam Earl will witness test. Two hour notice to be
provided.
HSE Events:No incidents, accidents, or spills. PM Temp: -25
Operational Details (06:00 - 06:00)
Complete installation of Magtec Y shape cuttings chute.Install Schlumberger goose neck transducer in derrick.
24 hour Forecast:Nipple up diverter spool, and install diverter line. Complete rig acceptance check list. Build spud mud. Test knife
valve and bag. Flood conductor. Pick up BHA#1, spud well.
Wind Direction: NE
AM Temp: -33
Ops @ 06:00 hrs: Nordic Rig 3 centered over Theta West #1. Phase: 0
Wind Speed: 10 to 15
24 hour Summary:
Complete install of "Y" cuttings chute for drilling. Load SLB MWD tools in pipe shed. Load 62 BBLs rig water,
tranfer between pits to verify all valves are good. Load inventory of shaker screens into pits. Install cellar box, cut
off at ground level. Dump 10 BBLs water in cellar. PJSM, lay out rig footprint of herculite for rig move around
cellar area. Cut off conductor 11" below top of rig mat. Weld on load ring. Post heat to 900°, wrap. PJSM. Move
rig, center over well.
Weather
Gen Conditions: Breezy, clear
Shoe Test: N/A
1/10/22
Actual Depth: 75'Last Evac Drill: NA
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/19/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date:
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
5
Phone 1 1.21.22
Phone 2 Tool Pusher (N): 37
API No: PTD: Field:
ft
ft
30.0
P.B.T.D.:
From To Hrs
6:00 12:00 6:00 2
12:00 18:00 6:00 2
18:00 1:30 7:30 2
1:30 6:00 4:30 2
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
23:30 0 8.7 14 25 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 96 1
2 Triplex 5.5 60 96 2
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
AZ.Item Comment
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
74 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Stack up diverter T spacer spool, knife valve and hydril. 21¼" 2K. Mix spud mud.
Nipple up spool, hydril, knife valve to 85 feet of 16" diverter line. AOGCC Inspector Adam Earl witnessed diverter test, gas alarms, flow
sensor. Annular closed 25 secs, knife valve opened in 10 secs. Koomey: 2900 system / after 1475 / 200 psi recharge 30 secs / 157 secs
to full pressure. No failures. Changed out quick connects to knife valve. Adjusted diverter line to orient tattle straight down.
Chain down jersey barriers to diverter line. Off load tripple silo for cement job. Install 4" ball valves on nipples in cellar. Spot MWD unit,
welders shop. Load DD tools in pipe shed. Center stack. Install riser. Flood stack. PJSM for spud.
* Diverter test Witness notifications sent 1/17/2022 @ 13:20. AOGCC Inspector Adam Earl witnessed test. No failures.
HSE Events:No incidents, accidents, or spills. PM Temp: -35
Operational Details (06:00 - 06:00)
Rig move. Rig leveled with timbers and plywood. Spill containment berms constructed. Build 250 bbls of fresh water spud mud. Place
diverter T spacer in cellar, position knife valve in cellar. Prepare to nipple up hydrill.
24 hour Forecast:Flood stack. Pick up BHA. Hole diverter drill with crew. Spud well.
Wind Direction: W
AM Temp: -40
Ops @ 06:00 hrs: PJSM for P/U BHA.Phase: 0
Wind Speed: 5 to 10
24 hour Summary:
Nipple up 21¼" hydril, diverter line, mix 370 bbls of 8.7 ppg water based gel spud mud. Spot MWD unit, tripple
silos, welders shop, off load surface casing 9 5/8" 40# L-80. AOGCC witnessed diverter test, and draw down. No
failures. Center stack with chain binders. Install riser.
Weather
Gen Conditions:Scattered clouds,
light wind fr the W.
Shoe Test: N/A
1/10/22
Actual Depth: 75'Last Evac Drill: NA
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/20/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.21.22
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date:
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
6
Phone 1 1.22.22
Phone 2 Tool Pusher (N): 37
API No: PTD: Field:
345 ft
235 ft
30.0
P.B.T.D.:
From To Hrs
6:00 12:00 6:00 2
12:00 18:00 6:00 22
18:00 24:00 6:00 22
0:00 6:00 6:00 22
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1 12¼ Kymera 110 345 235 3 78 55 3x12 3x16 0.920
1RR 12¼ Kymera 345 3x12 3x16 0.920
Time Depth MW PV YP Mud Gas Readings:Used
23:30 0 9.2 30 25 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 96 1
2 Triplex 5.5 60 96 2
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.21.22
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/21/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
1.21.22
Actual Depth: 75'Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Trip to bottom @ 229' MD.Phase: 0
Wind Speed: 5 mph
24 hour Summary:Pick up BHA#1, drill to 345'. POOH. Switch rig tongs. Rack back 3 stands HWDP. Pick up BHA#2. Rerun bit #1,
mud motor, MWD tools, load sources. Relocate cement tripple silo. Ream last stand to bottom.
Weather
Gen Conditions:Scattered clouds,
light wind fr the W.
Shoe Test: N/A
HSE Events:No incidents, accidents, or spills. PM Temp: -35
Operational Details (06:00 - 06:00)
Rig up trip tank hose, secure diverter line to the second set of barriers with chain. Thaw out bleeder line, inflate boots on riser.Put away
all tools in cellar from nipple up. Cellar secure and warm. Fill stack with 44.4 bbls of spud mud, no leaks. Pick up mud motor. Continue to
build spud mud .
24 hour Forecast:Drill ahead with BHA#2
Wind Direction: W
AM Temp: -30
Make up BHA #1. Kymera hybrid 12¼" bit w/ .92 TFA, 1.15° bend mud motor, XO to 4" 29# HWDP. Tag bottom @ 110'. Verify 80 foot
conductor, and 30' RKB. Drill from 110' to 345'. 50 rpm / 5-10k wob / 7k on bottom TQ / 3k off bottom TQ / 400 gpm / 700 PP. Mostly clay
seen on shakers. Flow check. POOH to mud motor.
Change out rig tongs from 1200 Foleys to 1500 Foleys. Bring SLB radioactive sources to rig floor, mud filter pony collar, jars. Pick up
HWDP to stand back. Adjust rig tongs, (not properly assembled), Build stands of the remaining 4" HWDP rack back. PJSM on picking up
BHA#2.
Make up BHA#2. RR bit #1, 12¼" hybrid, MM, Gamma Res tool, Directional module, Neutron density tool, filter pony collar, XO to 3 slick
monels 6¾" OD, XO to HWDP.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
5310888 1-1-WT-A-E-I-NO-
BHA
Total Hours 24:00
Comments:
Vis 0 Available
150 Background (Avg) % 0
5310888
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
Total Length (ft): 0.00
7
Phone 1 1.23.22
Phone 2 Tool Pusher (N): 37
API No: PTD: Field:
1,593 ft 240 AMSL
1,483 ft
1 30.0
P.B.T.D.:
From To Hrs
6:00 12:00 6:00 2
12:00 14:30 2:30 2
14:30 16:30 2:00 2
16:30 21:30 5:00 2
21:30 23:00 1:30 2
23:00 6:00 7:00 2
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1 12¼ Kymera 110 345 235 3 78 55 3x12 3x16 0.920
1RR 12¼ Kymera 345 3x12 3x16 0.920
Time Depth MW PV YP Mud Gas Readings:Used
3:00 1490 9.4 14 21 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 74 96 210 1250 1
2 Triplex 5.5 74 96 210 1250 2
MD TVD Inc.OD ID Conn. Length
30 30.00 0.0 8.25 6 6 5-8 R 29.79
264 264.00 0.3 12.125 2.5 6 5/8 R 7.16
336 336.00 0.4 8.25 2.5 6 5/8 R 19.42
426 426.00 0.5 12.125 2.5 6 5/8 R 4.18
516 516.00 0.4 8.25 5 6 5/8 FH 27.72
607 607.00 0.4 8.25 4 6 5/8 R 29.72
700 700.00 0.3 8.25 3 6 5/8 R 9.87
728 728.00 0.4 8.25 3 6 5/8 R 8.08
818 818.00 0.3 8 3 NC 50 3.34
941 941.00 0.2 6.75 2.813 NC 50 150.50
1039 1039.00 0.5 1.14 2.813 XT 39 1.14
1134 1134.00 0.5 4 3.24 XT 39 484.11
1229 1229.00 0.6 4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Total Length (ft): 926.96
283.39 Jars / Weatherford Mech
4 jts 4" XT 39 HW
5 ea- 6¾" slick monels
264.41 XO
262.2 16 jts 4" XT 39 HW
322.04 Filter sub
284.54 Bottleneck XO
247.55
322.39 SADN, Neutron Density
326.94 NM Pony collar
348.07 In line NM Stab
352.34 Telescope
219.43 NM Stab
2.01 Arc vision
AZ.Item Comment
219.43 Mud motor. 7/8 1.15°
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
69 Background (Avg) % 0
5310888
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
5310888 1-1-WT-A-E-I-NO-
BHA
Total Hours 24:00
Comments:
Drill from 746' to 928', 70 RPM, 10K WOB, 400 GPM, 1050 PP, 75K UP and DN weight. TQ on bottom 8K, TQ off bottom 5K.
Out drill ability to haul cuttings to Pad 4. Dragon boxes full. Work pipe while waiting on cuttings boxes to return from Prudhoe.
Drill from 928' to 1211', 70 RPM, 10K WOB, 420 GPM, 1160 PP, 75K UP and DN weight. TQ on bottom 8K, TQ off bottom 5K.
Work pipe, rotate and reciprocate full stand 40 RPM, 420 GPM, 1100 PP. Weight up mud system to 9.3 PPG before drilling ahead.
Resume drilling. Drill from 1211' to 1593'. 10K WOB, 100 RPM, 480 GPM, 1520 PP, 85K UP, 90K DN, 84 ROT weights, 8.5k TQ on, 7K
TQ off.
HSE Events:No incidents, accidents, or spills. PM Temp: -20
Operational Details (06:00 - 06:00)
Break circulation @ 200 GPM, 320 PP, Warm mud, and break gel strengths to avoid losses over the shakers. Gradually stage pumps up
to 400 GPM. Wash down to 320' MD. Make connection on first stand of HWDP. Drill 12¼" hole from 345' to 746'. 75 RPM, 5k WOB, 12
to15k WOB, 800 PP, 70k UP weight, 70k DN weight.
24 hour Forecast:Drill 12¼" Surface hole.
Wind Direction: SW
AM Temp: -15
Ops @ 06:00 hrs: Drilling @ 1593'.Phase: 0
Wind Speed: 5 mph
24 hour Summary:Drill 12¼" Surface hole from 435' to 1593'.
Weather
Gen Conditions:Scattered clouds,
light wind fr the W.
Shoe Test: N/A
1.21.22
Actual Depth: 80'Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/21/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.21.22
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date:
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
8
Phone 1 1.24.22
Phone 2 Tool Pusher (N): 37
API No: PTD: Field:
2,626 ft 41 240 AMSL
2,516 ft
2 30.0
P.B.T.D.:
From To Hrs
6:00 11:00 5:00 2
11:00 16:30 5:30 2
16:30 17:30 1:00 2
17:30 19:00 1:30 2
19:00 22:00 3:00 2
22:00 23:30 1:30 2
23:30 6:00 6:30 2
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1 12¼ Kymera 110 345 235 3 78 55 3x12 3x16 0.920
1RR 12¼ Kymera 345 3x12 3x16 0.920
Time Depth MW PV YP Mud Gas Readings:Used
3:00 2343 9.5+ 14 21 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 74 96 210 1250 1
2 Triplex 5.5 74 96 210 1250 2
MD TVD Inc.OD ID Conn. Length
1325 1325.00 0.7 8.25 6 6 5-8 R 29.79
1419 14196.00 0.9 12.125 2.5 6 5/8 R 7.16
1513 1513.00 0.7 8.25 2.5 6 5/8 R 19.42
1608 1608.00 0.6 12.125 2.5 6 5/8 R 4.18
1705 1705.00 0.4 8.25 5 6 5/8 FH 27.72
1797 1797.00 0.6 8.25 4 6 5/8 R 29.72
1889 1889.00 0.5 8.25 3 6 5/8 R 9.87
1982 1982.00 0.3 8.25 3 6 5/8 R 8.08
2079 2079.00 0.3 8 3 NC 50 3.34
2176 2176.00 0.3 6.75 2.813 NC 50 150.50
2244 2244.00 0.1 1.14 2.813 XT 39 1.14
2370 2370.00 0.2 4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.21.22
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/23/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
1.21.22
Actual Depth: 80'Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Drilling @ 2626'.Phase: 0
Wind Speed: 5 mph
24 hour Summary:Drill 12¼" Surface hole 1593' to 2626'
Weather
Gen Conditions:
Scattered clouds,
light wind fr the NE,
cooling trend.
Shoe Test: N/A
HSE Events:No incidents, accidents, or spills. PM Temp: -10
Operational Details (06:00 - 06:00)
Drill from 1593' to 1874'. 10K WOB, 100 RPM, 480 GPM, 1520 PP, 90K UP, 90K DN, 90 ROT weights, 8.5k TQ on, 7K TQ off. Stap and
tally 9.625" casing. 90 joints in the shed. Drifted with 8.61" drift.
24 hour Forecast:Drill 12¼" Surface hole. TD CBU 2 x's. POOH on elevators.
Wind Direction: NE
AM Temp: -5
Lubricate, service top drive, Change out belts on auger. Pump 50 GPM, Rotate 30 RPM, work pipe slowly. Service draw works. Cuttings
boxes all full, wait on trucks to return from G&I. Change out #2 charge pump belts.
Drill from 1874' to 1940. 10K WOB, 100 RPM, 480 GPM, 1520 PP, 90K UP, 90K DN, 90 ROT weights, 8.5k TQ on, 7K TQ off.
Thaw out auger chute, change out dragon box. Pump 50 GPM, Rotate 30 RPM, 200 PP, work pipe slowly.
Drill from 1940' to 2125'. 10K WOB, 100 RPM, 480 GPM, 1900 PP, 90K UP, 90K DN, 90 ROT weights, 8.5k TQ on, 7K TQ off.
Change out dragon boxes, found other chute now frozen, thaw out second side, circ,100 GPM, 30 RPM.
Drill from 2125' to 2626' . 5 to 20K WOB, 100 RPM, 500 GPM, 1950 PP, 95K UP, 100K DN, 95 ROT weights, 9.5k TQ on, 5.5K TQ off.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
5310888 1-1-WT-A-E-I-NO-
BHA
Total Hours 24:00
Comments:
Vis 0 Available
100 Background (Avg) % 0
5310888
Mud Properties Gas Details Fuel
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
283.2 Mud motor. 7/8 1.15°
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
276.63 In line NM Stab
286.04 Telescope
277.83 NM Stab
288.28 Arc vision
303.17 Filter sub
255.5 Bottleneck XO
286.77 SADN, Neutron Density
291.4 NM Pony collar
212.34 16 jts 4" XT 39 HW
Jars / Weatherford Mech
231.7 5 ea- 6¾" slick monels
261.15 XO
Total Length (ft): 926.96
4 jts 4" XT 39 HW
9
Phone 1 1.25.22
Phone 2 Tool Pusher (N): 37
API No: PTD: Field:
3,050 ft 41 212 AMSL
424 ft
3 30.0
P.B.T.D.:
From To Hrs
6:00 13:30 7:30 2
13:30 15:00 1:30 5
15:00 19:00 4:00 6B.01
19:00 21:00 2:00 6B.01
21:00 21:30 0:30 22
21:30 22:30 1:00 6J
22:30 2:00 3:30 6B.01
2:00 3:00 1:00 22
3:00 6:00 3:00 22
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1 12¼ Kymera 110 345 235 3 78 55 3x12 3x16 0.920
1RR 12¼ Kymera 345 3050 2705 3x12 3x16 0.920
Time Depth MW PV YP Mud Gas Readings:Used
3:00 3050 9.7 14 21 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 74 96 210 1250 1
2 Triplex 5.5 74 96 210 1250 2
MD TVD Inc.OD ID Conn. Length
2364 2364.00 0.1 8.25 6 6 5-8 R 29.79
2463 2463.00 0.3 12.125 2.5 6 5/8 R 7.16
2551 2551.00 0.3 8.25 2.5 6 5/8 R 19.42
2647 2647.00 0.2 12.125 2.5 6 5/8 R 4.18
2742 2742.00 0.3 8.25 5 6 5/8 FH 27.72
2839 2839.00 0.4 8.25 4 6 5/8 R 29.72
2931 2931.00 0.3 8.25 3 6 5/8 R 9.87
8.25 3 6 5/8 R 8.08
8 3 NC 50 3.34
6.75 2.813 NC 50 150.50
1.14 2.813 XT 39 1.14
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Total Length (ft): 926.96
4 jts 4" XT 39 HW
16 jts 4" XT 39 HW
Jars / Weatherford Mech
5 ea- 6¾" slick monels
XO
Filter sub
Bottleneck XO
226.12 SADN, Neutron Density
267.18 NM Pony collar
227.78 In line NM Stab
273.04 Telescope
242.31 NM Stab
267.53 Arc vision
AZ.Item Comment
325.39 Mud motor. 7/8 1.15°
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
120 Background (Avg) % 0
5310888 1-3-CT-S-X-1-BT-TD
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
5310888 1-1-WT-A-E-I-NO-
BHA
Total Hours 24:00
Comments:
Clear all tools from BHA off rig floor, clean floor, remove floor mats.
Rig up casing running equipment.
CBU. Load landing joint, hanger, Volant casing running tool, 6' extensions and hand slips in pipe shed. Prepare to trip out of hole.
Monitor well static.
PJSM, Trip out of the hole on elevators from 3050' to 368'. Good hole fill, one tight spot @ 1260'.
Pick up a joint of 4" for handling tool, stand back with 2 - 6¾" Monel DC's. Lay down pony collar.
Bring false bowl to floor to lay down BHA.
PJSM. Pull radioactive sources from MWD tools.
Lay down remaining BHA components, drain motor, lay down motor with bit.
HSE Events:No incidents, accidents, or spills. PM Temp: 4
Operational Details (06:00 - 06:00)
Drill from 2626' to 3050'.TD. 15K WOB, 100 RPM, 485 GPM, 2050 PP, 100K UP, 100K DN, 100 ROT weights, 10k TQ on, 7K TQ off.
Stap and tally 3 joint shoe track. Load
24 hour Forecast:Run casing to bottom. Rig up cementers pump cement.
Wind Direction: NE
AM Temp: 10
Ops @ 06:00 hrs: Rigging up to run casing. Phase: 0
Wind Speed: 15
24 hour Summary:Drill 12¼" Surface hole to 3050". Reach total depth.
Weather
Gen Conditions:
Scattered clouds,
light wind fr the NE,
cooling trend.
Shoe Test: N/A
1.21.22
Actual Depth: 80' 3,050 Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/24/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.21.22
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
10
Phone 1 1.26.22
Phone 2 Tool Pusher (N): 68
API No: PTD: Field:
3,050 ft 41 212 AMSL
0ft
430.0
P.B.T.D.:30.5
From To Hrs
6:00 7:30 1:30 22
7:30 11:30 4:00 6.A.01
11:30 15:30 4:00 12
15:30 18:30 3:00 12
18:30 22:00 3:30 12
22:00 24:00 2:00 12
24:00 4:00 4:00 12
4:00 6:00 2:00 12
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1 12¼ Kymera 110 345 235 3 78 55 3x12 3x16 0.920
1RR 12¼ Kymera 345 3050 2705 3x12 3x16 0.920
Time Depth MW PV YP Mud Gas Readings:Used
3:00 3050 9.7 14 21 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 74 96 210 1250 1
2 Triplex 5.5 74 96 210 1250 2
MD TVD Inc.OD ID Conn. Length
2364 2364.00 0.1 8.25 6 6 5-8 R 29.79
2463 2463.00 0.3 12.125 2.5 6 5/8 R 7.16
2551 2551.00 0.3 8.25 2.5 6 5/8 R 19.42
2647 2647.00 0.2 12.125 2.5 6 5/8 R 4.18
2742 2742.00 0.3 8.25 5 6 5/8 FH 27.72
2839 2839.00 0.4 8.25 4 6 5/8 R 29.72
2931 2931.00 0.3 8.25 3 6 5/8 R 9.87
8.25 3 6 5/8 R 8.08
8 3 NC 50 3.34
6.75 2.813 NC 50 150.50
1.14 2.813 XT 39 1.14
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Total Length (ft): 926.96
4 jts 4" XT 39 HW
16 jts 4" XT 39 HW
Jars / Weatherford Mech
5 ea- 6¾" slick monels
XO
Filter sub
Bottleneck XO
226.12 SADN, Neutron Density
267.18 NM Pony collar
227.78 In line NM Stab
273.04 Telescope
242.31 NM Stab
267.53 Arc vision
AZ.Item Comment
325.39 Mud motor. 7/8 1.15°
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
120 Background (Avg) % 0
5310888 1-3-CT-S-X-1-BT-TD
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
5310888 1-1-WT-A-E-I-NO-
BHA
Total Hours 24:00
Comments:
Pump 40 BBLs 10# mud push, Drop bottom plug, SLB mixed and pumped 378 BBLS 10.7# Lead, 50 BBLS 15.7# Tail. Drop top plug,
kick out with 10 BBLS water. Rig displaced @ 6 BPM.
Run 9.625" L-80 LTC #40 casing, baker loc to pin end of #4. Perform float check, fil pipe on the fly. Torque to 7270 ft/lbs. Tag ledge @
1477'. Work pipe and circulate.
Work pipe, circulate tight spot F/1477' MD. -T/ 1,555' MD. Pump 1-3 BPM, 180-260 PP. Work joints # 34 and #35.
Run casing, pumping 200 GPM, work past a large coal bed. 1955' MD.
Run casing from 1955 to 3030. Washed down every other joint using the CRT.
Pick up landing joint and hanger from shed. Remove running tool. Install seals on running tool. Thjread running tool back to LJ. Land
hanger on load shoulder.
Circulate through Volant CRT, stage up to 6 BPM. 350 PP, 11 % flow.Rig up cement hose to 1502 circulating port on CRT. Resume
pumping. Pump air through outside cement line for cement truck. Attempt to clear, with steam, appears blocked. Rig up hose to cement
truck. Hold PJSM in Doghouse with Cementers, Truck pusher, rig crew , mud man , Co Man. Pressure test lines to 1500 PSI low, 3700
HSE Events:No incidents, accidents, or spills. PM Temp: 4
Operational Details (06:00 - 06:00)
Make up hanger to landing joint, make drift run with Cameron hand. Complete maitenance on casing elevators in welding shop, Lay
dwon LJ and hanger. Rig up GBR tongs. PJSM. Run casing.
24 hour Forecast:Run casing to bottom. Circulate and condition the well. Rig up cementers pump cement.
Wind Direction: NE
AM Temp: 10
Ops @ 06:00 hrs: Phase: 0
Wind Speed: 15
24 hour Summary:Bring all casing running equipment to rig floor. Conduct 'dummy run' with landing joint to confirm distance from rig
floor to load shoulder. Rig up GBR Volant CRT, tongs, run casing from surface to
Weather
Gen Conditions:
Scattered clouds,
light wind fr the NE,
cooling trend.
Shoe Test: N/A
1.21.22
Actual Depth: 80' 3,050 Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/26/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.21.22
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
11
Phone 1 1.27.22
Phone 2 Tool Pusher (N): 68
API No: PTD: Field:
3,050 ft 41 212 AMSL
0ft
530.0
P.B.T.D.:30.5
From To Hrs
6:00 7:30 1:30 12
7:30 12:00 4:30 13
12:00 18:00 6:00 15
18:00 20:30 2:30 22
20:30 23:00 2:30 22
23:00 24:00 1:00 14
24:00 6:00 6:00 14
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
3:00 3030 9.7 15 20 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 96 1
2 Triplex 5.5 96 2
MD TVD Inc.OD ID Conn. Length
2931 2931.00 0.3
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Robert Wall (907) 398-9191 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.21.22
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/26/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
1.21.22
Actual Depth: 80' 3,050 Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Nippling up 13 5/8" 5K BOP stack.Phase: 0
Wind Speed: 10 to 15
24 hour Summary:
Cement in place @ 07:15 hrs. 120 BBLS lead cement to surface. Took all returns to the cellar VIA the two
installed 4" welded conductor outlets. Cement removal done by two 300 BBL vac trucks, followed by 2 Super
sucker trucks. Of load all MWD tools used in surface, clean out cellar, nipple down diverter line, knife valve, 21¼"
Hydril. Pull starter head, install Cameron well head spool. Nipple up Nordic 11" 5K BOP stack.
Weather
Gen Conditions:Clearing, scattered
clouds.
Shoe Test: N/A
HSE Events:No incidents, accidents, or spills. PM Temp: -16
Operational Details (06:00 - 06:00)
Drop top plug, SLB kicked out with 10 BBLs water, rig pumped 213.3 BBLs 9.7 ppg spud mud to bump plug on strokes. Pressure up to
1200 from FCP of 500. Held pressure for 5 minutes. Floats did not hold. Shut in well. CIP @ 07:15
24 hour Forecast:Nipple upflow line, riser. Test BOP's with AOGCC Inspector using 4" test joint. Pick up BHA#3. for 8½" hole
section. Single in with drill pipe.
Wind Direction: W
AM Temp: -20
While holding pressure on floats: Clean up rig floor. Rig down cement hoses. Clean in cellar. Off load 300 BBLs spud mud to trucks for
disposal. Lay down Volant CRT with GBR crew. Lay down landing joint.
Complete rigging down diverter line. Open well @ 1300. No flow, cement set up. Rig down all GBR tools, keep power tongs on floor.
Nipple down riser and bell nipple. Remove knife valve. Nipple down 21¼" Hydril. With loader and stinger lift annular and spool out of
cellar.
Nipple down starting head in cellar with Cameron hand, remove from cellar. Fix bogey tires on moving system. Clean shakers, and
possum belly in pits. Remove 20 joints of 9.625" casing from ODS. Lay down remaining GBR casing equipment.
Nipple up well head. Cameron 11" 5k. Test wellhead connection to 5000 psi for 10 mins. Good test. Witnessed by CoMan.
Nipple up Nordic 13 5/8" 5k BOP stack. Hydril annular. Shaffer double gate. (VBR 2 7/8" x 5"), and a blind ram, Mud cross, Single gate
Shaffer, (VBR 2 7/8 x 5").
Resume nipple up of BOP. Clean out suction and discharge screens in pumps. Change out one bogey tire on moving system.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
58 Background (Avg) % 0
Mud Properties Gas Details Fuel
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
267.18
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Total Length (ft): 0.00
12
Phone 1 1.28.22
Phone 2 Tool Pusher (N): 68
API No: PTD: Field:
3,050 ft 41 212 AMSL
0ft
630.0
P.B.T.D.:30.5
From To Hrs
6:00 12:00 6:00 14
12:00 14:00 2:00 15
14:00 21:00 7:00 15
21:00 24:00 3:00 22
24:00 4:00 4:00 22
4:00 6:00 2:00 22
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
3:00 3030 9.7 15 20 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 96 1
2 Triplex 5.5 96 2
MD TVD Inc.OD ID Conn. Length
2931 2931.00 0.3 8.5 3.25 4 1/2 R 0.85
6.375 3 NC 50 3.04
6.25 2.813 5 1/2 FH 2.99
6.75 2 5 1/2 FH 27.48
6.75 2.25 5 1/2 FH 6.10
6.75 5 NC 50 27.34
6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Total Length (ft): 870.69
Jars / Weatherford Mech
4 jts 4" XT 39 HW
Bottle neckXO
16 jts 4" XT 39 HW
5 ea- 6¾" slick monels
Filter sub
Telescope
8 3/8" stab w/ float With ported float.
Ecoscope w/ 8¼" stab.
8 3/8" ILS
Bit sub
XOS
AZ.Item Comment
267.18 8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
58 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
Make up floor valves, pick up 4" test joint. Function all BOPE. Lower top drive and warm up. Fluid pack choke and kill lines, stack, choke
manifold. Shell test BOP upper pipe rams, choke valves 11,12,4,Dart valve. 250 low, 5000 psi high. State Inspector Austin McLeod on
location for witness. Test H2S sensors and methane sonsors, cellar, rig floor, shakers. Good tests.
Test BOPE as per procedure with the 4" test joint. 250 psi low, 5000 psi high on all tests except annular was tested to 250 psi low, and
2500 psi high. State Inspector Austin McLeod witnessed all tests, and conducted a rig inspection.All tests passed. SIMOPS: strap pipe,
clean pit #4. Transfer mud from pit 3 to pits 1 & 2. Verify valves are holding.
Rig down test equipment. Set long wear bushing.(9.75" ID). Install new 4" XT39 saver sub. Re-align the target 90° in kill line for proper
flow path. Rabbit, strap remaining 96 joints of DP to be picked up, and program the MWD tools in pipe shed.
Bring pallet of subs into pipe shed. PJSM. Pick up BHA#3 8½" DD505S PDC bit W/ 7 x 11 jets. Packed hole rotary assembly. Load
sources, trip in hole to top of HWDP
Single in with 4" XT 39 on top of the BHA.
HSE Events:No incidents, accidents, or spills. PM Temp: -28
Operational Details (06:00 - 06:00)
Jack up rig. Move back (East) 4". Level and shim sub base and complex. Cur riser down 3'. Install riser. Secure BOPE
24 hour Forecast:Single in hole to 1000'.
Wind Direction: SW
AM Temp: -30
Ops @ 06:00 hrs: Single in the hole with 4" XT39 Phase: 0
Wind Speed: 15
24 hour Summary:
Jack up rig , move rig, level and center over well. Conduct initial BOPE test with State Inspector as witness. All
pass. Install new saver sub on top drive. Strap and tally 96 joints of 4" XT39 DP. Program MWD logging tools. Set
wear bushing, 9.75" ID. Pick up BHA#3.
Weather
Gen Conditions:Clearing, scattered
clouds.
Shoe Test: N/A
1.28.2022
Actual Depth: 80' 3,050 Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/27/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.28.2022
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Supervisor (N): Robert Wall (907) 398-9191 Al Hansen
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Scott Heim/Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
13
Phone 1 1.29.22
Phone 2 Tool Pusher (N): 68
API No: PTD: Field:
3,050 ft 41 212 AMSL
0ft
730.0
P.B.T.D.:30.5
From : Hrs
6:00 9:30 3:30 14
9:30 12:30 3:00 8A
12:30 16:30 4:00 21
16:30 20:00 3:30 22
20:00 21:00 1:00 6A.01
21:00 22:00 1:00 6A.01
22:00 24:00 2:00 7
0:00 2:00 2:00 22
2:00 6:00 4:00 22
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
3:00 3030 9.7 15 20 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 96 1
2 Triplex 5.5 96 2
MD TVD Inc.OD ID Conn. Length
2931 2931.00 0.3 8.5 3.25 4 1/2 R 0.85
6.375 3 NC 50 3.04
6.75 2 5 1/2 FH 27.48
6.75 2.25 5 1/2 FH 6.10
6.75 5 NC 50 27.34
6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Report #:
Supervisor (D): Scott Heim (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Robert Wall (907) 398-9191 Al Hansen
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.28.2022
NA
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/28/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
1.28.2022
Actual Depth: 80' 3,050 Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Cleaning pits 1, and 2. Prepare for mud swap.Phase: 0
Wind Speed: 13
24 hour Summary:
Pick up 63 joints. Stand back. Circulate the casing clean @ 1500. Work on top drive relay switch. Single in to
2916. Test casing to 3500 psi. good test. POOH 14 stands, single back in to 2916'. Total new joints picked up
105. Install new saver sub in top drive. Clean pits 1 and 2 for mud displacement. Off load all old mud into two 290
BBL trucks. Flush pumps with fresh water into pit #1.
Weather
Gen Conditions: Cloudy
Shoe Test: N/A
HSE Events:No incidents, accidents, or spills. PM Temp: -13
Operational Details (06:00 - 06:00)
Single in the hole picking up 4" XT 39 drill pipe. From 868' to 1511'. CBU surface to surface.
24 hour Forecast:Displace 9.6+ppg spud mud out of the hole with 9+ppg 4% KCL clayshield. Drill shoe track and 20 feet of new
hole CBU, pull back into casing blow down top drive rig up and perform LOT. Drill ahead.
Wind Direction: SW
AM Temp: -16
Break circulation. Mud very clabbered, unable to get the pumps to up drilling rates. Shut down. Blow down top drive.
Off load 220 BBLs spud mud into trucks. Clean pits 1 and 2. Pump 25 BBLs water through mud pumps into pit 1. Prepare for mud swap.
Top drive repair. Change out rotate relay as per Tesco Rep.
Single in the hole picking up 4" XT 39 DP.Wash down joints 62 to 65. Up weight 95k, down weight 95
Blow down top drive. Rig up head pin to test casing. Hook up hoses to test casing. Pump 3.5 BBLs to 3250 with rig pump. Bring up to
3500 with test pump. Hold and chart for 30 mins. Bleed off 25 psi. Good test. Pump in 3.5 BBLs , get back 3.3 BBLs.Rig down test
equipment, blow down choke. Attempt to blow down kill line. Frozen. Begin thawing with steam.
POOH 14 stands. From 2916' to 1590'.
Trip back in the hole singling in the last 40 joints. 97k Up. 100k down weight.
Cchange out saver sub and grabber dies.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
Vis 0 Available
58 Background (Avg) % 0
Mud Properties Gas Details Fuel
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
267.18 8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
8 3/8" ILS
Telescope
Bit sub
Ecoscope w/ 8¼" stab.
Filter sub
Bottle neckXO
8 3/8" stab w/ float
5 ea- 6¾" slick monels With ported float.
4 jts 4" XT 39 HW
16 jts 4" XT 39 HW
Jars / Weatherford Mech
Total Length (ft): 867.70
14
Phone 1 1.30.22
Phone 2 Tool Pusher (N): 68
API No: PTD: Field:
3,343 ft 41 212 AMSL
293 ft
830.0
P.B.T.D.:30.5
From : Hrs
6:00 9:00 3:00 21
9:00 10:30 1:30 5
10:30 16:30 6:00 21
16:30 20:30 4:00 5
20:30 21:00 0:30 5
21:00 21:30 0:30 5
21:30 22:30 1:00 22
22:30 23:00 0:30 22
23:00 6:00 7:00 5
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
3:00 3070 9.05 8 18 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 85 96 250 1100 1 3070 40 160
2 Triplex 5.5 85 96 250 1100 2 3070 40 150
MD TVD Inc.OD ID Conn. Length
2931 2931.00 0.3 8.5 3.25 4 1/2 R 0.85
6.375 3 NC 50 3.04
6.75 2 5 1/2 FH 27.48
6.75 2.25 5 1/2 FH 6.10
6.75 5 NC 50 27.34
6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Total Length (ft): 867.70
4 jts 4" XT 39 HW
16 jts 4" XT 39 HW
Jars / Weatherford Mech
Filter sub
Bottle neckXO
8 3/8" stab w/ float
5 ea- 6¾" slick monels With ported float.
8 3/8" ILS
Telescope
Bit sub
Ecoscope w/ 8¼" stab.
AZ.Item Comment
267.18 8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
55 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
Rig down test equipment. Trip to bottom.
Rotary drill from 3070' to 3343' MD. 500 GPM, 1100 PP, 19% Flow, 100 RPM, 7k TQ.
Displace wellbore from 9.7# spud mud to 9.05# 2% Klashield. Pump 10 BBL water spacer ahead, then 290 BBLs new mud. 3 to 4 BPM.
Reciprocate pipe through out job.
All returns were taken into pit 1. Clean out and empty pits 1 and 2. Thaw and clean out sump line in pit #1 via super sucker.
Drill out cement from 2940 to top of the float collar @ 2945' Drill float collar, shoe track, shoe @ 3030' MD. Clean out 12¼" rate hole
from 3030 to 3050'. Drill new formation from 3050' to 3070'. 450 GPM, 820 PP, 15.6% Flow, 60 RPM, 7k TQ. Drilling out of all 4 pits as
active with new mud on board.
Circulate bottoms up. SPR's, Monitor well for 10 mins. Static.
POOH slow from 3070' to 2940'. Wellbore tried to swab.
Rig up to pump down both sides for LOT. Pump 1 BBL, pressure up to 790 psi, observe break over at 14.1 ppg EMW. Using 9.05 ppg
mud, 3030 TVD. Notify C.O.O. Good test.
HSE Events:No incidents, accidents, or spills. PM Temp: -13
Operational Details (06:00 - 06:00)
Clean pit #1.
24 hour Forecast:Drill down to core point.
Wind Direction: SW
AM Temp: -10
Ops @ 06:00 hrs: Drilling 8½" hole with rotary assembly @ 3343 Phase: 0
Wind Speed: 14
24 hour Summary:
Clean pits 1 and 2 of residual spud mud. Displace wellbore to 9# 2% KCL Klashield. Drill shoetrack, and clean out
to old TD @ 3050'. Drill 20 feet of new hole. CBU. Pull into casing, racking back two stands. Blow down top drive.
Rig up head pin and cement line, fluid pack kill and choke lines to choke manifold. Perform LOT to 14.1 ppg
EMW. Rig down. Drill 8½" hole with rotary assembly from 3070' to 3343'.
Weather
Gen Conditions: Foggy
Shoe Test: N/A 14.1 ppg EMW
1.28.2022
Actual Depth: 80' 3,050 Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' Last Rig Insp.:
1.29.22
OD/Weight 20"/129# 9-5/8" / 40# 7" / 29# Last Safety Mtg: 1/29/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.28.2022
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Supervisor (N): Robert Wall (907) 398-9191 Al Hansen
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Scott Heim (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
15
Phone 1 1.31.22
Phone 2 Tool Pusher (N): 68
API No: PTD: Field:
4,667 ft 41 212 AMSL
1,324 ft
9 30.0
P.B.T.D.:30.5
From : Hrs
6:00 12:00 6:00 2
12:00 19:00 7:00 2
19:00 19:30 0:30 7
19:30 24:00 4:30 2
0:00 6:00 6:00 2
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
3:00 3070 9.05 8 18 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 85 96 250 1535 1 3993 40 180
2 Triplex 5.5 85 96 250 1535 2 3993 40 170
MD TVD Inc.OD ID Conn. Length
3181 3181.00 0.5 8.5 3.25 4 1/2 R 0.85
3277 3277.00 0.3 6.375 3 NC 50 3.04
3371 3371.00 0.6 6.75 2 5 1/2 FH 27.48
3464 3464.00 0.5 6.75 2.25 5 1/2 FH 6.10
3559 3559.00 0.4 6.75 5 NC 50 27.34
3655 3655.00 0.2 6.75 2.25 NC 50 5.10
3749 3749.00 0.2 6.75 2.813 NC 50 150.50
3845 3845.00 0.2 6.75 2.813 NC 50 7.80
3939 3939.00 0.3 4.75 2.75 XT39 3.45
4034 4034.00 0.3 4 3.24 XT 39 484.11
4119 4119.00 0.2 4.75 2.25 XT 39 30.46
4224 4224.00 0.2 4 3.24 XT 39 121.47
Report #:
Supervisor (D): Scott Heim (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Robert Wall (907) 398-9191 Al Hansen
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Top Schrader Bluff Last BOP Test: 1.28.2022
1.30.22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Top of West Sak Last Safety Mtg: 1/30/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' 3451 Last BOP Drill:
1.28.2022
Actual Depth: 80' 3,050 Top of Canning Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' 3802 Last Rig Insp.:
Ops @ 06:00 hrs: Drilling ahead @ 4467'. Phase: 0
Wind Speed: 10
24 hour Summary:Drill 8½" hole with rotary assembly from 3343' to 4467'. Collecting 30 foot samples. Strapping, drifting, 5½" P110
17# BTC liner in pipe shed. Process 66 joints.
Weather
Gen Conditions: Light snow
Shoe Test: N/A 14.1 ppg EMW 4323
HSE Events:No incidents, accidents, or spills. PM Temp: -9
Operational Details (06:00 - 06:00)
Drill from 3343' to 3648' MD. Drilling with rotary assembly. 500 GPM, 1050 PP, 80 to 90 RPM, 9 to 10K on bottom TQ, 4 to 5K off bottom
torque, 20K WOB, collecting 30 foot samples.
24 hour Forecast:Drill to core point. Pump sweep surface to surface, POOH for core barrels.
Wind Direction: SW
AM Temp: -5
Drill from 3648' to 3993' MD. Drilling with rotary assembly. 500 GPM, 1050 PP, 80 to 90 RPM, 9 to 10K on bottom TQ, 4 to 5K off
bottom torque, 20K WOB, remain with 30 foot samples. Up weight 110k. Dn weight 110k, Rot weight 110k.
Turnbuckle pin fell from derrick. Originating from torque tube bracing. Stop drilling, continue circulating @ 330 GPM, 500 PP. Derrick
man inspect derrick, replacing the missing pin and securing turnbuckle. Clean suction screen on pump #2.
Drill from 3993' to 4190' MD. 500 GPM, 1490 PP, 80 to 90 RPM, 9 to 10K on bottom TQ, 4 to 5K off bottom torque, 20K WOB, remain
with 30 foot samples. Up weight 110k. Dn weight 110k, Rot weight 110k.
Drill from 4190' - 4467' MD. 500 GPM, 1490 PP, 80 to 90 RPM, 9 to 10K on bottom TQ, 4 to 5K off bottom torque, 20K WOB, remain
with 30 foot samples. Up weight 115k. Dn weight 120k, Rot weight 115k.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
Vis 0 Available
55 Background (Avg) units 60
Mud Properties Gas Details Fuel
Connection units 100
Trip Gas % NA Volume Delivered: 0
AZ.Item Comment
216.08 8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
203.3 8 3/8" ILS
223.02 Telescope
209.97 Bit sub
213.18 Ecoscope w/ 8¼" stab.
232.4 Filter sub
173.23 Bottle neckXO
233.97 8 3/8" stab w/ float
207.64 5 ea- 6¾" slick monels With ported float.
146.37 4 jts 4" XT 39 HW
195.62 16 jts 4" XT 39 HW
176.89 Jars / Weatherford Mech
Total Length (ft): 867.70
16
Phone 1 2.1.22
Phone 2 Tool Pusher (N): 68
API No: PTD: Field:
5,697 ft 41 212 AMSL
1,030 ft
10 30.0
P.B.T.D.:30.5
From : Hrs
6:00 12:00 6:00 2
12:00 18:00 6:00 2
18:00 24:00 6:00 2
0:00 3:30 3:30 2
3:30 6:00 2:30 7
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
3:00 5500 9.3+ 8 18 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 85 96 250 1800 1 5035 40 240
2 Triplex 5.5 85 96 250 1800 2 5035 40 250
MD TVD Inc.OD ID Conn. Length
4319 4319.00 0.3 8.5 3.25 4 1/2 R 0.85
4414 4414.00 0.2 6.375 3 NC 50 3.04
4509 4509.00 0.2 6.75 2 5 1/2 FH 27.48
4604 4604.00 0.2 6.75 2.25 5 1/2 FH 6.10
4698 4698.00 0.2 6.75 5 NC 50 27.34
4792 4792.00 0.0 6.75 2.25 NC 50 5.10
4887 4887.00 0.1 6.75 2.813 NC 50 150.50
4982 4982.00 0.0 6.75 2.813 NC 50 7.80
5076 5076.00 0.2 4.75 2.75 XT39 3.45
5171 5171.00 0.1 4 3.24 XT 39 484.11
5265 5265.00 0.4 4.75 2.25 XT 39 30.46
5359 5359.00 0.3 4 3.24 XT 39 121.47
5454 5454.00 0.5
5550 5550.00 0.6
Report #:
Supervisor (D): Scott Heim (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Robert Wall (907) 398-9191 Al Hansen
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Top Schrader Bluff Last BOP Test: 1.28.2022
1.31.22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Top of West Sak Last Safety Mtg: 1/30/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' 3451 Last BOP Drill:
1.28.2022
Actual Depth: 80' 3,050 Top of Canning Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' 3802 Last Rig Insp.:
Ops @ 06:00 hrs: Service top drive. Replace wash pipe. Circulating through the headpin at 4 BPM - 700 PSI. Phase: 0
Wind Speed: 10
24 hour Summary:Drill 8½" hole from 4467' to 5697'. Wash pipe in top drive began leaking. Rig up to circulae with 2" cement hose.
CBU. Pull one stand. Set down low. Circulate through wash pipe 3 BPM. Remove old wash pipe install new.
Weather
Gen Conditions: Light snow
Shoe Test: N/A 14.1 ppg EMW 4323
HSE Events:No incidents, accidents, or spills. PM Temp: -9
Operational Details (06:00 - 06:00)
Drill from 4467' MD to 4801'. Drilling with rotary assembly. 500 GPM, 1550 PP, 80 to 90 RPM, 9 to 10K on bottom TQ, 4 to 5K off bottom
torque, 25K WOB, collecting 30 foot samples.
24 hour Forecast:Drill to core point. Pump sweep surface to surface, POOH for core barrels.
Wind Direction: SW
AM Temp: -5
Drill from 4801' to 5131'. Drilling with rotary assembly. 500 GPM, 25k WOB, 1850 PP, 80 to 100 RPM, 9 to 10K on bottom TQ, 4 to 5K
off bottom torque, 25K WOB, collecting 30 foot samples.
Drill from 4801' to 5131'. Drilling with rotary assembly. 500 GPM, 25k WOB, 1850 PP, 80 to 100 RPM, 9 to 10K on bottom TQ, 4 to 5K
off bottom torque, 25K WOB, collecting 30 foot samples.
Drill from 5131' to 5697'. Drilling with rotary assembly. 500 GPM, 25k WOB, 1850 PP, 80 to 100 RPM, 9 to 10K on bottom TQ, 4 to 5K
off bottom torque, 25K WOB, collecting 30 foot samples. Offload 290 BBLs new 2% KCL. Send out 70 BBLs old mud.
Service top drive. Change out wash pipe, while circulating through head pin and cement hose, one stand off bottom.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
Vis 0 Available
55 Background (Avg) units 80
Mud Properties Gas Details Fuel
Connection units 120
Trip Gas % NA Volume Delivered: 0
AZ.Item Comment
139.64 8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
176.4 8 3/8" ILS
184.35 Telescope
150.54 Bit sub
195.63 Ecoscope w/ 8¼" stab.
344.98 Filter sub
242.71 Bottle neckXO
344.08 8 3/8" stab w/ float
203.43 5 ea- 6¾" slick monels With ported float.
250.65 4 jts 4" XT 39 HW
239.61
204.07 16 jts 4" XT 39 HW
222.86 Jars / Weatherford Mech
Total Length (ft): 867.70
234.14
17
Phone 1 2.2.22
Phone 2 Tool Pusher (N): 66
API No: PTD: Field:
5,697 ft 41 212 AMSL
1,030 ft
11 30.0
P.B.T.D.:30.5
From : Hrs
6:00 6:30 0:30 21
6:30 12:00 5:30 2
12:00 24:00 12:00 2
Midnight 6:00 6:00 2
0:00 0:00
24:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
15:00 6,220' 9.35 8 27 Rig:
21:00 6,513' 9.4 9 28 Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 85 96 250 2,250 1 5,530 40 280
2 Triplex 5.5 85 96 250 2,250 2 5,530 40 270
MD TVD Inc.OD ID Conn. Length
5,645' 5,645' 0.59 8.5 3.25 4 1/2 R 0.85
6,023' 6,023' 0.96 6.375 3 NC 50 3.04
6,213' 6,213' 1.33 6.75 2 5 1/2 FH 27.48
6,401' 6,401' 1.54 6.75 2.25 5 1/2 FH 6.10
6.75 5 NC 50 27.34
6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Total Length (ft): 867.70
4 jts 4" XT 39 HW
16 jts 4" XT 39 HW
Jars / Weatherford Mech
Filter sub
Bottle neck XO
8 3/8" stab w/ float
5 ea- 6¾" slick monels With ported float.
286.51 8 3/8" ILS
Telescope
281.11 Bit sub
276.99 Ecoscope w/ 8¼" stab.
AZ.Item Comment
247.02 8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
44 Connection units NA
Trip Gas % NA Volume Delivered: 0
Vis 0 Available
43 Background (Avg) units 100
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
Drill 8 1/2" hole from 5,697' 6,044'. 25K wob, 90 rpm, 500 gpm @ 1,900 psi. 140K up, 138K rot, 145K dn
Continue drill ahead from 6,044' to 6,648'.
Continue drilling from 6,648' to 6,928' 20K wob, 95 rpm, 10/12K torque. 500 gpm @ 2,250 psi.
HSE Events:IFO, No incidents, accidents, or spills reported. PM Temp: -27
Operational Details (06:00 - 06:00)
Repair TD wash pipe packing
24 hour Forecast:Drill to geo call core point, circ hole clean, POH, stand back BHA, pick up core assembly #1, RIH, cut core.Wind Direction: W
AM Temp: -32
Ops @ 06:00 hrs: Drilling ahead @ 6,928'Phase: 0
Wind Speed: 7
24 hour Summary:Finish packing top drive swivel packing, drilling ahead from 5,697' to 6,928'Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW 4323
1.28.2022
Actual Depth: 80' 3,050 Top of Canning Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' 3802 Last Rig Insp.:
1.31.22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Top of West Sak Last Safety Mtg: 2/2/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6,430' 3451 Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Top Schrader Bluff Last BOP Test: 1.28.2022
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Supervisor (N): Paul Smith (907) 398-9191 Al Hansen
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Scott Heim (907) 992 0516 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
18
Phone 1 2.3.22
Phone 2 Tool Pusher (N): 66
API No: PTD: Field:
7,180' ft 41 212 AMSL
1,483' ft
12 30.0
P.B.T.D.:30.5
From : Hrs.
6:00 10:00 4:00 5
10:00 15:30 5:30 2
15:30 16:30 1:00 5
16:30 17:00 0:30 5
17:00 19:30 2:30 5
19:30 22:00 2:30 5
22:00 23:00 1:00 5
23:00 23:30 0:30 6
23:30 24:00 0:30 6
Midnight 5:00 5:00 6
5:00 5:30 0:30 5
5:30 6:00 0:30 6
0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
9:00 6,870' 9.3 10 29 Rig:
15:00 7,178' 9.3 10 28 Total:
21:00 7,190' 9.4 10 28
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 85 96 200 1,450 1 7,023' 30 300
2 Triplex 5.5 85 96 200 1,450 2 7,023' 30 310
MD TVD Inc.OD ID Conn. Length
8.5 3.25 4 1/2 R 0.85
6.375 3 NC 50 3.04
6.75 2 5 1/2 FH 27.48
6.75 2.25 5 1/2 FH 6.10
6.75 5 NC 50 27.34
6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Drill ahead from 6,928' to 7,180'. "core point". 15K wob, 100 rpm, 425 gpm @ 1,500 psi.
Total Length (ft): 867.70
4 jts 4" XT 39 HW
16 jts 4" XT 39 HW
Jars / Weatherford Mech
Filter sub
Bottle neck XO
8 3/8" stab w/ float
5 ea.- 6¾" slick monels With ported float.
8 3/8" ILS
Telescope
Bit sub
Ecoscope w/ 8¼" stab.
AZ.Item Comment
8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
44 Connection units 120
45 Trip Gas % NA Volume Delivered: 0
Vis 0 Available
43 Background (Avg) units 80
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
POH f/ 7,118' to 7,055'. Observed 35K overpull @ 7,055' work tight pipe, knock loose hammering down,
Back reaming tight hole from 7,058' to 7,052' 155K up, 150K dn, 400 gpm @ 1,400 psi. 6 bhp losses Observed reaming.
Continue back reaming 7,118' to 6,928', wash to 6,834, pull on elevators to 6,549'. Hole not taking proper fill.
Monitor well.
Work stand, well swabbing, giving mud picking up, pushing mud away going down.
Circulate condition mud raise mud wt. to 9.3#
Flow check well, flow, pit gain 5 bbl.
Circulate condition mud, pump 10 bbl. LCM pill, raise mud weight to 9.4#
Stand back 1 stand, Blow down mud lines and top drive. Observed well flowing.
CBU, 400 gpm 1,450 psi. 49 units max gas observed.
HSE Events:IFO, No incidents, accidents, or spills reported. PM Temp: -28
Operational Details (06:00 - 06:00)
At 6,928' Observed circulating 60 bph losses. Circulate and cut mud weight back to 9.2 @ 3bpm @ 647 psi. sweep well with 20 bbl. nut
plug lcm.
24 hour Forecast:Finish POH, stand back and lay down BHA, test BOPE, test witness waived by Bob Noble 2/2/22 @ 07:00 Wind Direction: W
AM Temp: -39
Ops @ 06:00 hrs: Pumping out of hole @ 6,359'Phase: 0
Wind Speed: 10
24 hour Summary:Control losses, drill ahead to core point, work tight pipe free, circ hole, POH pumping out due to swabbing.Weather
Gen Conditions: fair
Shoe Test: N/A 14.1 ppg EMW 4323
1.28.2022
Actual Depth: 80' 3,050 Top of Canning Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' 3802 Last Rig Insp.:
1.31.22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Top of West Sak Last Safety Mtg: 2/2/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' 3451 Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Top Schrader Bluff Last BOP Test: 1.28.2022
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Supervisor (N): Paul Smith (907) 398-9191 Al Hansen
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Scott Heim (907) 992 0516 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
19
Phone 1 2.4.22
Phone 2 Tool Pusher (N): 66
API No: PTD: Field:
7,470 ft 41 212 AMSL
1,483' ft
12 30.0
P.B.T.D.:30.5
From : Hrs.
6:00 8:30 2:30 6
8:30 9:00 0:30 21
9:00 12:00 3:00 6
12:00 17:30 5:30 2
17:30 24:00 6:30 5
0:01 0:30 0:29 6
0:30 1:30 1:00 21
1:30 2:00 0:30 21
2:00 4:00 2:00 3
4:00 5:30 1:30 6
5:30 6:00 0:30 7
0:00
0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
9:00 6,870' 9.3 10 29 Rig:
15:00 7,178' 9.3 10 28 Total:
21:00 7,190' 9.4 10 28
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 85 96 200 1,450 1
7,023' 30 300
2 Triplex 5.5 85 96 200 1,450 2 7,023' 30 310
MD TVD Inc.OD ID Conn. Length
8.5 3.25 4 1/2 R 0.85
6.375 3 NC 50 3.04
6.75 2 5 1/2 FH 27.48
6.75 2.25 5 1/2 FH 6.10
6.75 5 NC 50 27.34
6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Report #:
Supervisor (D): Scott Heim (907) 992 0516 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith/ M.Brouillet (907) 398-9191 Al Hansen
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: 280.0 Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.22
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Top Schrader Bluff Last BOP Test: 1.28.2022
1.31.22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Top of West Sak Last Safety Mtg: 2/2/22 6:00 PM
Casing: Conductor Surface Inter/TOC 6,430' 3451 Last BOP Drill:
1.28.2022
Actual Depth: 80' 3,050 Top of Canning Last Diverter Drill: 1.21.22
Plan Depth: 75' 3,500' 9,500' 3802 Last Rig Insp.:
Ops @ 06:00 hrs: POOH Phase: 0
Wind Speed: 10
24 hour Summary:Weight up[ F/9.4 ppg - T/9.6 ppg. Backream with excessive torque when pulling up. Work area until no problems
visable &,402' MD - T/7,213' MD. TOOH no pump or rotation F/ 7,213' MD. - 7,023' MD.
Weather
Gen Conditions: fair
Shoe Test: N/A 14.1 ppg EMW 4323
HSE Events:No accidents, Incidents or spills.PM Temp: -28
Operational Details (06:00 - 06:00)
Pumping out of hole f/ 6,549'' to 5,646'.Pump out @ 2 BPM. 75 RPM, up wt. 150k, 150k dn.
24 hour Forecast:TOOH. Lay down BHA. Test BOPE Wind Direction: W
AM Temp: -39
Attempt to POOH, 40k overpull. Make up string to top drive establish parameters.
Backream F/7,402' MD.-T/7,118' MD. String torquing up. Up wt. 155k. Dn wt. 164k. Rot wt. 162k. 90 rpm. 200 gpm. 1,400 psi.
TOOH F/ 7,213' MD- T/ 7,023' MD no pump or rotation. Pulled W/ no difficultiers.
Repair leaking hydraulic hose on top drive.
Blow down Top Drive & Mud line. Monitor well. Install pressure gauge on drillpipe. Pressure increase of 25 psi. detected.
RIH T/ 7,180' MD. Took weight at 7,163' MD & 7,173' MD. Stalled rotary worked area until no weight taken on string.
Drill F/ 7,180' MD - T/7,470' MD. 100 rpm, 425 gpm, 15K bit wt. Well ballooning on connections. Pressure increase of 65psi.
Circulate and condition mud. Wt. up F/9.4 ppg. -T/9.6 ppg. Up wt. 155k. Dn wt. 162. 500 gpm 2,280 psi. Hole taking 10 bph loss rate .
Reduce pump rate T/400 gpm, 1,580 psi. w/9.6 ppg mud wt.
POOH F/7,470 MD - T/7,402' MD.
Monitor Well. Confirm wellbore breathing.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 23:59
Comments:
Vis 0 Available
43 Background (Avg) units 80
Mud Properties Gas Details Fuel
44 Connection units 120
45 Trip Gas % NA Volume Delivered: 0
AZ.Item Comment
8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
8 3/8" ILS
Telescope
Bit sub
Ecoscope w/ 8¼" stab.
Filter sub
Bottle neck XO
8 3/8" stab w/ float
5 ea.- 6¾" slick monels With ported float.
4 jts 4" XT 39 HW
16 jts 4" XT 39 HW
Jars / Weatherford Mech
Total Length (ft): 867.70
20
Phone 1 2.5.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
7,470 ft 41
ft
14 30.3
P.B.T.D.:
From To Hrs
6:00 12:00 6:00 6
12:00 18:00 6:00 6
18:00 24:00 6:00 6
0:01 1:30 1:29 6
1:30 2:30 1:00 5
2:30 5:00 2:30 9
5:00 6:01 1:01 7
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
2 8½ D505S 3050 7,470 4,420 73.6 70 7x11 0.650
Time Depth MW PV YP Mud Gas Readings:Used
0:01 7470 9.6 14 19 Rig:
18:00 7470 9.6 14 20 Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
5,645' 5,645' 0.59 8.5 3.25 4 1/2 R 0.85
6,023' 6,023' 0.96 6.375 3 NC 50 3.04
6,213' 6,213' 1.33 6.75 2 5 1/2 FH 27.48
6,401' 6,401' 1.54 6.75 2.25 5 1/2 FH 6.10
6970 6969.50 1.7 6.75 5 NC 50 27.34
7159 7159.00 1.7 6.75 2.25 NC 50 5.10
7348 7347.76 1.7 6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.11
4.75 2.25 XT 39 30.46
4 3.24 XT 39 121.47
Report #:
Supervisor (D): Scott Heim (907) 992-0516 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Mark Brouillet (907) 631-9850 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: 0.0 Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 1.28.2022
2.5.22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/5/22 12:00 AM
Casing: Conductor Surface Inter/TOC 6430' Last BOP Drill:
1/10/22
Actual Depth: 75'Last Evac Drill: NA
Plan Depth: 75' 5,500' 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Work BHA Phase: N/A
Wind Speed: -33
24 hour Summary:Backream out of hole to casing shoe @ 3,030' MD. Circulate @ 475 gpm, large amount of cuttings load on
shakers.Slip & Cut drill line.
Weather
Gen Conditions: Fair
Shoe Test: N/A
HSE Events:No Accidents, Incidents, Spills PM Temp: -33
Operational Details (06:00 - 06:00)
Backream Out of hole F/7,152' MD - 5,347' MD. Flow rate 140-150 gpm pressure 300- 400 psi.Rt. Wt 125k. Flow in 2-6. Torque 10k - 14k.
Erratic torque spikes stalled drill string.
24 hour Forecast:Lay down BHA, Rig up & Test BOPE, P/U Coring assembly
Wind Direction: N/A
AM Temp: -36
Backream F/5,347' MD - T/4,183' MD. 80 rpm, 170 gpm, 480 psi. Tq. - 6k-15k. Rt. Wt. 126k. Erratic torque throughout reaming stalling
drillstring intermittently. PVT @ 12:00 = 405 bbl. PVT @ 18:00 = 392 bbl. (Preventative Maintenance saver sub changed out due to high
torque values.)
Backream F/4,183' MD - T/3,803' MD. 90 rpm, 120 gpm, 310 psi. Tq. - 6k-15k. Rt. Wt. 115k. Add 100 bbl. Mud to pits F/Vac Truck.
Backream F/3,803' MD - T/3,030' MD. 90 rpm, 120 gpm, 310 psi. Tq. - 6k-15k. Rt. Wt. 115k.
Rotate and Reciprocate bottoms up X 2 @ 475 gpm, 1,575 psi 90 rpm, up wt. 95k. Dn 100k. Rot wt. 93k. Shakers showed a good cuttings
load indications of hole unloading.
Slip & Cut 66' of drilling line. Spool on new line notice line wear cut an additional 108' of drill line.
Service top drive, blocks and traveling equipment.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663 1-1-BT-S-X-I-NO-BHA
Total Hours 24:00
Comments:
Vis 0 Available
44 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
45 Connection % 0
Trip Gas % 0 Volume Delivered: 0
281.11 Bit sub
276.99 Ecoscope w/ 8¼" stab.
AZ.Item Comment
247.02 8½" PDC bit
311.98 8 3/8" stab w/ float
309.86 5 ea.- 6¾" slick monels
286.51 8 3/8" ILS
312.35 Telescope
16 jts 4" XT 39 HW
Jars / Weatherford Mech
4 jts 4" XT 39 HW
Filter sub With ported float.
Bottle neck XO
Total Length (ft): 867.70
21
Phone 1 2.6.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
7,470 ft 41
ft
15 30.3
P.B.T.D.:
From To Hrs
6:00 8:00 2:00 7
8:00 8:15 0:15 5
8:15 9:15 1:00 6
9:15 10:00 0:45 6
10:00 14:30 4:30 6
14:30 15:30 1:00 15
15:30 24:00 8:30 15
0:01 1:30 1:29 15
1:30 2:30 1:00 15
2:30 3:00 0:30 6
3:00 6:00 3:00 6
6:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1RR1 8 1/2 PDC 7470 7 X 11
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 96 1
2 Triplex 5.5 60 96 2
MD TVD Inc.OD ID Conn. Length
6970 6969.50 1.7 8.5 3.25 4 1/2 R 0.85
7159 7159.00 1.7 6.75 NC 50 26.95
7348 7347.76 1.7 6.75 2 5 1/2 FH 5.07
6.75 2 5 1/2 FH 27.48
6.75 2.25 5 1/2 FH 6.10
6.75 5 NC 50 27.34
6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.50
4.75 2.25 XT 39 30.39
4 3.24 XT 39 121.08
Report #:
Supervisor (D): Scott Heim (907) 992-0516 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Mark Brouillet (907) 631-9850 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: 0.0 Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1.22.2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/6/22
2.5.22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/5/22 12:00 AM
Casing: Conductor Surface Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030 Last Evac Drill: NA
Plan Depth: 75' 3,500 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Picking UP BHA Phase: N/A
Wind Speed: 12
24 hour Summary:Rig service, Derrick inspection, TOOH T/BHA, Lay Down BHA, Test BOPE
Weather
Gen Conditions: Fair
Shoe Test: N/A
HSE Events:No accidents, Incidents or spills.PM Temp: -19
Operational Details (06:00 - 06:00)
Rig Service, Lubricate blocks, Top Drive, Perform Derrick Inspection (Post Jarring)
24 hour Forecast:Pick Up BHA, RIH, Drill F/7,470' MD
Wind Direction: West
AM Temp: -19
Continue Test BOPE, W/4" & 5-1/2" Test joint. (Witness waived by AOGCC Rep Bob Noble)
Rig Down F/ BOPE Test. Pull Test plug, Install Wear Bushing.
Clear & Clean Floor, Prep to pick up BHA
Pick up BHA, Bit, Motor, MWD, Load Sources.
Pump Dry Job, Blow down Mud Lines.
TOOH T/510' (Jars)
Swap out to new jars.
Rack HWDP & Drill collars in Derrick, 14:30Lay down 8-1/2" Drilling BHA.
Drain Stack / Pull Wear Bushing/ Set Test Plug.
Test BOPE, W/4" & 5-1/2" Test joint. (Witness waived by AOGCC Rep Bob Noble)
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 23:59
Comments:
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
311.98 Mud Motor Power Pak
309.86 8-3/8" Gauge Stabilizer Plunger float non ported in stabilizer
AZ.Item Comment
312.35 8½" PDC bit
Telescope
8 3/8" stab w/ float
Ecoscope w/ 8¼" stab.
8 3/8" ILS
Bottle neck XO
16 jts 4" XT 39 HW
Jars / Weatherford Mech
5 ea.- 6¾" slick monels
Filter sub
Total Length (ft): 896.61
4 jts 4" XT 39 HW
22
Phone 1 2/7/2022
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450 ft 41
950 ft
16 30.3
P.B.T.D.:
From To Hrs
6:00 7:30 1:30 6
7:30 9:30 2:00 6
9:30 11:00 1:30 5
11:00 12:00 1:00 6
12:00 14:00 2:00 6
14:00 18:00 4:00 3
18:00 20:30 2:30 2
20:30 21:00 0:30 5
21:00 24:00 3:00 2
0:00 5:00 5:00 2
5:00 6:00 1:00 3
6:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1RR1 8 1/2 PDC 7470 8450 980 7 X 11
Time Depth MW PV YP Mud Gas Readings:Used
21:00 7712 9.4 10 27 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 96 1
2 Triplex 5.5 60 96 2
MD TVD Inc.OD ID Conn. Length
6970 6969.50 1.7 312.35 8.5 3.25 4 1/2 R 0.85
7159 7159.00 1.7 311.98 6.75 NC 50 26.95
7348 7347.76 1.7 309.86 6.75 2 5 1/2 FH 5.07
7632 7631.05 1.7 6.75 2 5 1/2 FH 27.48
8199 8198.60 1.3 6.75 2.25 5 1/2 FH 6.10
6.75 5 NC 50 27.34
6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.50
4.75 2.25 XT 39 30.39
4 3.24 XT 39 121.08
Report #:
Supervisor (D): Scott Heim (907) 992-0516 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Mark Brouillet (907) 631-9850 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Well at Total Depth Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/6/22
2/6/22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 1/17/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6430' Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030 Last Evac Drill: NA
Plan Depth: 75' 3,500 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Phase: N/A
Wind Speed: 6
24 hour Summary:TIH, Complete Mud Dilution F/9.6 ppg - T/9.4ppg. Drill F/7,470' MD
Weather
Gen Conditions: Fair
Shoe Test: N/A
HSE Events:No Accidents, Incidents or Spills.Windchill Temp: -53
Operational Details (06:00 - 06:00)
RIH picking up remaining BHA, Drill collars & HWDp, Jars F/Derrick.
24 hour Forecast:Circulate hole clean, TOOH, Lay Down BHA, Rig up wireline, Perform logging run via wireline.
Wind Direction: NW
AM Temp: -44
Circulate and condition mud while troubleshooting data transmission rates. 400 gpm 1,960 psi. (Sim-OP load 20 joints 5-1/2" Casing into
pipeshed
Drill F/7,714' MD - T/7,995' MD 90 rpm, torque 9-12k ft/lbs. flow in 400 gpm, pressure 2,260 psi. Bit wt.15-25k. Flow out 18% up 160k,
dn170k rot 165k. Drill at 175 fph controlled ROP.
Drill F/7,995' MD - T/8,450' MD 90 rpm, torque 9-12k ft/lbs. flow in 400 gpm, pressure 2,260 psi. Bit wt.15-25k. Flow out 18% up 160k,
dn170k rot 165k. Well at Total Depth.
Circulate at 475 gpm, 2,360 psi. 90 rpm, up wt 165k, 172k Dn wt. Rot 167k.
RIH picking up 4" Drillpipe F/Pipeshed, 39 joints total. (Serviced crown)
Fill Pipe, Test MWD 350 gpm, 898 psi. (Sim-OP remove coring tools F/Pipeshed)
RIH F/Derrick T/3,030' MD. Casing shoe, Fill pipe. Up wt. 95k Dn. Wt. 100k rt. Wt. 100k
RIH F/3,030' MD - T/6,042' MD
Wash & Ream F/6,042' MD - T/7,470' MD
Drill F/7,470' MD - T/7,714' MD 90 rpm, torque 8-11k ft/lbs. flow in 400 gpm, pressure 2,200 psi. Bit wt. 15-25k. Flow out 18% up 158k,
dn165k rot 160k.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
Vis 439 Available
47 Background (Avg) % 400
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Mud Motor Power Pak
8-3/8" Gauge Stabilizer Plunger float non ported in stabilizer
AZ.Item Comment
8½" PDC bit
Telescope
8 3/8" stab w/ float
307.73 Ecoscope w/ 8¼" stab.
307.61 8 3/8" ILS
Bottle neck XO
16 jts 4" XT 39 HW
Jars / Weatherford Mech
5 ea.- 6¾" slick monels
Filter sub
Total Length (ft): 896.61
4 jts 4" XT 39 HW
23
Phone 1 2/8/2022
Phone 2 Tool Pusher (N):
API No: PTD: Field:
ft 41
ft
17 30.3
P.B.T.D.:
From To Hrs
6:00 7:00 1:00 5
7:00 7:15 0:15 21
7:15 8:15 1:00 6
8:15 8:45 0:30 21
8:45 16:00 7:15 6
16:00 16:30 0:30 21
16:30 17:00 0:30 6
17:00 18:30 1:30 6
18:30 24:00 5:30 6
0:00 6:00 6:00 21
6:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1RR1 8 1/2 PDC 7470 8450 980 7 X 11
Time Depth MW PV YP Mud Gas Readings:Used
12:00 8450 9.5 11 30 Rig:
16:00 8450 9.5 12 30 Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 70 96 208 2384 1
8450 30-40 470 537
2 Triplex 5.5 72 96 212 2384 2
8450 30-40 465 500
MD TVD Inc.OD ID Conn. Length
6970 6969.50 1.7 312.35 8.5 3.25 4 1/2 R 0.85
7159 7159.00 1.7 311.98 6.75 NC 50 26.95
7348 7347.76 1.7 309.86 6.75 2 5 1/2 FH 5.07
7632 7631.05 1.7 6.75 2 5 1/2 FH 27.48
8199 8198.60 1.3 6.75 2.25 5 1/2 FH 6.10
8294 8293.57 1.2 6.75 5 NC 50 27.34
8370 8369.03 0.8 6.75 2.25 NC 50 5.10
6.75 2.813 NC 50 150.50
6.75 2.813 NC 50 7.80
4.75 2.75 XT39 3.45
4 3.24 XT 39 484.50
4.75 2.25 XT 39 30.39
4 3.24 XT 39 121.08
Total Length (ft): 896.61
4 jts 4" XT 39 HW
BHA Out of hole @ 24:00
Bottle neck XO
16 jts 4" XT 39 HW
Jars / Weatherford Mech
5 ea.- 6¾" slick monels
Filter sub
321.38 Telescope
324.99 8 3/8" stab w/ float
307.73 Ecoscope w/ 8¼" stab.
307.61 8 3/8" ILS
Mud Motor Power Pak
8-3/8" Gauge Stabilizer Plunger float non ported in stabilizer
AZ.Item Comment
8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
50 Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
44 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663 1-4-BT-S-X-I-RO-TD
Total Hours 24:00
Comments:
Trip Out on elevators, F/3,030' MD - T/896' BHA (Hole took correct fill)
Rack back HWDP & Jars in derrick, L/D BHA.
Clear & Clean Rig Floor, Prep to P/U Wireline. Wireline truck had mechanical failure 3 miles from location. Rig performing preventative
maintenance, Cleaning work areas, performing rig safety audit, cold Weather shut down in effect -55°
OWFF (Observe well for flow- Static)
POOH F/8,450' MD - T/7,490' MD. No problems encountered pulled slick.
Drain Trip Tank, Blow down 2" fill up line.
Pump out of hole @ 1 BPM, F/7,490' MD - T/ 3,030' MD (Casing shoe)
Monitor well for flow
Circulate bottoms up @ 475 GPM - 1,540 psi. 90 rpm. Up 95k Dn. 100k.
HSE Events:No Accidents, Incidents or Spills.Windchill: -71
Operational Details (06:00 - 06:00)
Circulate sweep at 475 gpm, 2,360 psi. 90 rpm, up wt 180k, 175k Dn wt. Rot 175k.
24 hour Forecast:Wireline logging.
Wind Direction: WSW
Temp: -49
Ops @ 06:00 hrs: Waiting on Wireline truck, Truck had equipment malfunction with brake lines freezing up Phase: N/A
Wind Speed: 9
24 hour Summary:8,450' MD. Circulated hole clean, Pumped out of hole to casing shoe @3,030'. Monitored well, Pumped dry job,
Tripped out of hole T/ BHA. Laid down BHA including drill collars. PJSM, Rig up wireline.
Weather
Gen Conditions: Fair
Shoe Test: N/A
1/10/22
Actual Depth: 75' 3,030 Last Evac Drill: NA
Plan Depth: 75' 3,500 9,500' Last Rig Insp.:
2/6/22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 1/17/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/6/22
KB-GL, ft
Prog FTD md: 8,450' MD - Total Depth Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Mark Brouillet (907) 631-9850 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Scott Heim (907) 992-0516 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
24
Phone 1 2/9/2022
Phone 2 Tool Pusher (N):
API No: PTD: Field:
ft 41
ft
18 30.3
P.B.T.D.:
From To Hrs
6:00 7:00 1:00 21
7:00 12:00 5:00 21
12:00 16:30 4:30 11
16:30 18:00 1:30 11
18:00 24:00 6:00 21
2:00 2:00 11
2:00 3:30 1:30 6
3:30 4:00 0:30 6
4:00 6:00 2:00 5
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1RR2 8 1/2 PDC 7 X 11
Time Depth MW PV YP Mud Gas Readings:Used
15:00 0 9.5 12 30 Rig:
3:00 0 9.5 11 30 Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 96
2 Triplex 5.5 96
MD TVD Inc.OD ID Conn. Length
6970 6969.50 1.7 312.35 8.5 3.25 4 1/2 R 0.85
7159 7159.00 1.7 311.98 6.75 2.75 NC 50 3.00
7348 7347.76 1.7 309.86 4.75 2.75 XT39 3.43
7632 7631.05 1.7 4 3.24 XT 39 484.50
8199 8198.60 1.3 4.75 2.25 XT 39 30.39
8294 8293.57 1.2 4 3.24 XT 39 121.08
8370 8369.03 0.8
Total Length (ft): 643.25
321.38 4 jts 4" XT 39 HW
324.99
Bottle neck XO
307.73 16 jts 4" XT 39 HW
307.61 Jars / Weatherford Mech
AZ.Item Comment
8½" PDC bit
Bit Sub w/ float valve
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
49 Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
47 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:
TIH T/1,400' MD.
Circulate @ 250 gpm, 315 PSI
PJSM, Bring in logging tools to pipeshed, Sheaves and miscellaneous wireline equipment to rig floor. Spot wireline truck.
Rig up wireline sheaves, bring wireline to rig floor, Stage wireline logging tools for pick up. Swap out wireline generator equipment failure
due to extreme cold weather. Sim-Ops- Blow through cement line verify clear. Grease choke manifold, preventative maintenance on lo-
torque valves on floor.
Make up Wireline tools for Logging run # 1 Triple Combo- Gamma, NMR, Resistivity T/150' length of tool string.
Wireline logging unit spooler brake failure. Sim-Ops. Rig down DD/MWD monitors, draw works encoder & external wiring. Work on rotary
clutch. Assemble subs for cleanout BHA. Monitor well via trip tank hole taking .6 bph. F/20:00 - T/24:00 hole took 2 bbls.
Pull logging tools from hole & lay down. Wireline unit can not be repaired on location. Unit taken to Deadhorse shop for repair or
replacement. Monitoring hole via trip tank. Hole taking .6 bbl. Per hr.
M/U Clean out BHA, Bit, Bit sub, X-O, HWDP & jars
HSE Events:No Accidents, Incidents or Spills.Windchill: N/A
Operational Details (06:00 - 06:00)
Wireline truck brakes froze up 3 miles from location. Service top drive & blocks, Prep to pick up Wireline. Wireline truck on location @
07:00. Monitor well via trip tank hole taking .6 bph.
24 hour Forecast:Wireline log.
Wind Direction: N/A
Temp: -51
Ops @ 06:00 hrs: Phase: N/A
Wind Speed: 0
24 hour Summary:Rig up wireline, Wireline logging unit spooler brake not disengaging. Apply heaters, Mechanic working on solution
Extreme cold weather causing malfunction.
Weather
Gen Conditions: Fair
Shoe Test: N/A
1/10/22
Actual Depth: 75' 3,030 Last Evac Drill: NA
Plan Depth: 75' 3,500 9,500' Last Rig Insp.:
2/6/22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 1/17/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/6/22
KB-GL, ft
Prog FTD md: 8,450' MD - Total Depth Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Mark Brouillet (907) 631-9850 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Scott Heim (907) 992-0516 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
25
Phone 1 2/10/2022
Phone 2 Tool Pusher (N):
API No: PTD: Field:
ft 41
ft
19 30.3
P.B.T.D.:
From To Hrs
6:00 13:30 7:30 5
13:30 14:30 1:00 6
14:30 14:45 0:15 21
14:45 16:00 1:15 11
16:00 19:00 3:00 11
19:00 20:00 1:00 11
20:00 21:00 1:00 6
21:00 22:00 1:00 6
22:00 22:30 0:30 5
22:30 22:45 0:15 6
22:45 24:00 1:15 6
24:00 2:00 2:00 3
2:00 6:00 4:00 3
6:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1RR3 8 1/2 PDC 7 X 11
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 96
2 Triplex 5.5 96
MD TVD Inc.OD ID Conn. Length
6970 6969.50 1.7 312.35 8.5 3.25 4 1/2 R 0.85
7159 7159.00 1.7 311.98 6.75 2.75 NC 50 3.00
7348 7347.76 1.7 309.86 4.75 2.75 XT39 3.43
7632 7631.05 1.7 4 3.24 XT 39 484.50
8199 8198.60 1.3 4.75 2.25 XT 39 30.39
8294 8293.57 1.2 4 3.24 XT 39 121.08
8370 8369.03 0.8
Total Length (ft): 643.25
321.38 4 jts 4" XT 39 HW
324.99
Bottle neck XO
307.73 16 jts 4" XT 39 HW
307.61 Jars / Weatherford Mech
AZ.Item Comment
8½" PDC bit
Bit Sub w/ float valve
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00 *5-20k weight taken @ Torque 8-12k. 5,954', 5,985', 6,210', 6,319', 6,730', 6,925', 6,980' & 7,010'*
Comments:
TIH F/643' MD - T/ 3,030' MD.
Circulate bottoms up 2,600 strokes, 500 gpm-10010 psi. flo-22%
Blow down top drive / Mud line.
TIH F/3,030' MD - T/5,663' MD with no problems.
Wash & Ream F/ 5,663' MD - T/6,050' MD. Work tight area at 5,985', 6,000' MD. Areas worked vigorously with 450 gpm 1,420 psi, 90
rpm, torque 7-12k. Run through area with no pump no rotation took no weight.
Wash & Ream F/6,050' MD- T/ 7,000' MD. 450 gpm, 1,450 psi. 90 rpm, Torque 8-12k. Worked area at 6,925' & 6,980' encountered high
toque swings string took 20k.
POOH with dumb iron assembly, L/D bit, bit sub, X-O.
Clear & Clean Rig Floor.
R/U Wireline logging tools
Perform Loggging run # 1 Triple combo, CMR, Gamma. T/6,028' MD. Monitor well via trip tank
Logging tools encountered obstruction at 6,028' MD. Could not work through. POOH with Wireline logging tools & L/D same
M/U Cleanout Assembly, Bit, Bit sub w/ Non ported plunger style float valve, X-O, HWDP,Jars T/643' MD
HSE Events:No Accidents, Incidents or Spills.Windchill: -66
Operational Details (06:00 - 06:00)
Circulate @1,400' MD. Perform rig maintennace while waiting on Wireline unit repair
24 hour Forecast:TOOH, R/U Wireeline, Perform Wireline logging
Wind Direction: WSW
Temp: -29
Ops @ 06:00 hrs: Reaming to bottom Phase: N/A
Wind Speed: 18
24 hour Summary:
RIH with dumb iron T/1,400' MD. Wait on Wireline Unit, POOH lay down Dumb iron assembly, Rig up and RIH
with Wireline logging tools, Took weight at 6,028' MD could not pass through. TOOH lay down Wireline logging
tools, P/U cleanout assembly, TIH, Circulate at shoe 3,030' MD. RIH T/5,663' MD. Wash and ream
Weather
Gen Conditions: Fair
Shoe Test: N/A
1/10/22
Actual Depth: 75' 3,030 Last Evac Drill: NA
Plan Depth: 75' 3,500 9,500' Last Rig Insp.:
2/6/22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 1/17/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/6/22
KB-GL, ft
Prog FTD md: 8,450' MD - Total Depth Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Mark Brouillet (907) 631-9850 Jake Henry
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Scott Heim (907) 992-0516 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
26
Phone 1 2/11/2022
Phone 2 Tool Pusher (N):
API No: PTD: Field:
ft 41
ft
20 30.3
P.B.T.D.:
From To Hrs
6:00 12:00 6:00 3
12:00 15:30 3:30 5
15:30 16:00 0:30 21
16:00 16:30 0:30 6
16:30 18:30 2:00 3
18:30 19:30 1:00 6
19:30 20:00 0:30 3
20:00 22:30 2:30 5
22:30 23:00 0:30 21
23:00 24:00 1:00 5
midnight 0:30 0:30 5
0:30 1:30 1:00 21
1:30 5:30 4:00 6
5:30 6:00 0:30 6
0:00
Bit # Size Depth Depth Feet Bit hrs K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1RR3 8 1/2 PDC 7 X 11
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 96
2 Triplex 5.5 96
MD TVD Inc.OD ID Conn. Length
6970 6969.50 1.7 312.35 8.5 3.25 4 1/2 R 0.85
7159 7159.00 1.7 311.98 6.75 2.75 NC 50 3.00
7348 7347.76 1.7 309.86 4.75 2.75 XT39 3.43
7632 7631.05 1.7 4 3.24 XT 39 484.50
8199 8198.60 1.3 4.75 2.25 XT 39 30.39
8294 8293.57 1.2 4 3.24 XT 39 121.08
8370 8369.03 0.8
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hansen Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: 8,450' MD - Total Depth Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/6/22
2/6/22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 1/17/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6430' Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030 Last Evac Drill: NA
Plan Depth: 75' 3,500 9,500' Last Rig Insp.:
Ops @ 06:00 hrs: Pulling out of hole on elevators Phase: N/A
Wind Speed: 14
24 hour Summary:
Ream to bottom F/7,000' - T/8,450', CBU X 3, Monitor well, TOH on elevators 30-40k overpull. Backream out of
hole. Large amounbts of shale at shakers. TIH, Weight up mud system to 9.6 ppg in & out. Pump sweep around.
TOOH
Weather
Gen Conditions: Fair
Shoe Test: N/A
HSE Events:No Accidents, Incidents or Spills Windchill: -47
Operational Details (06:00 - 06:00)
Wash & Ream F/7,000' MD- T/ 8,450' MD. 450 gpm, 1,450 psi. 90 rpm, Torque 8-12k.
24 hour Forecast:TOOH, P/U Wireline logging tools, Log run # 1&2
Wind Direction: WSW
Temp: -20
8,450' MD - Circulate and weight up mud F/9.4 ppg - T/9.6 ppg. Up wt 150k dn wt. 160k. 90 rpm, 400 gpm, 1,590 psi. flo-18% PVT 470.
Observe well for flow monitor via trip tank 36 bbl. Loss during circulation well exhaled 19.6 bbl. Back.
8,450' MD - Circulate 40 bbl. Hi-vis sweep 420 gpm- 1,660 psi.100 rpm
8,450' MD - Circulate 40 bbl. Hi-vis sweep 420 gpm- 1,660 psi.100 rpm, slight increase in cutting when sweep to surface.
8,450' MD Pull T/8,407' MD. Observe well for flow. Decreasing returns in 30 minute monitor. Confirming wellbore breathing.
POOH F/8,407' MD - T/6,546'' MD Pumping out 1 BPM, No Rotation.
Circulate Bottoms up X 3 standing back 1 stand each bottoms up, Large amounts of shale visible at shakers. 450 gpm 1,550 psi, 90 rpm.
8,219' MD.
8,219' MD. Blow down topdrive, Mud line. Observe well for flow - Wellbore breathing.
Pull on elvators F/8,219' MD- T/8,189' MD. 35-40k overpull, String took weight going down.
Backream Out of hole F/8,219' MD - T/ 7,745' MD. Tight areas 8,124',7,997', 7,890', 7,808' & 7,735'
Decision made TIH to increase mud weight to hold back shales. Blow Down Topdrive,mudline. TIH F/7,745' MD - T/8,408' MD.
Ream F/8,408' MD - T/ 8,450' MD 8,439' MD to 8,450' MD. 11' fill
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
POH on elevators from 6,546' to 6,072'.
Total Hours 24:00
Comments:
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
8½" PDC bit
Bit Sub w/ float valve
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
321.38 4 jts 4" XT 39 HW
324.99
Bottle neck XO
307.73 16 jts 4" XT 39 HW
307.61 Jars / Weatherford Mech
Total Length (ft): 643.25
27
Phone 1 2/12/2022
Phone 2 Tool Pusher (N):
API No: PTD: Field:
ft 41
ft
21 30.3
P.B.T.D.:
From To Hrs.
6:00 6:30 0:30 21
6:30 10:30 4:00 6
10:30 10:45 0:15 21
10:45 11:30 0:45 6
11:30 13:30 2:00 11
13:30 20:30 7:00 11
20:30 23:00 2:30 21
23:00 24:00 1:00 21
Midnight 0:30 0:30 21
0:30 6:00 5:30 6
0:00
0:00
0:00
0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1RR4 8 1/2 PDC 7 X 11
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 96
2 Triplex 5.5 96
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 8.5 3.25 4 1/2 R 0.85
6.75 5.5 NC 50 26.95
6.75 2.75 NC 50 5.07
6.75 3.24 5.5 FH 3.45
6.75 2.25 NC50 27.34
6.75 2.25 NC50 5.10
3 X 6-3/4" Drill Collars 6.75 3.24 NC 50 89.67
Crossover 6.25 XT-39 3.45
16 jts 4" XT 39 HW 4 3.24 XT 39 484.50
Jars / Weatherford Mech 4.75 2.25 XT 39 30.39
4 jts 4" XT 39 HW 4 3.24 XT 39 121.08
Total Length (ft): 797.85
8-3/8" Stabilizer
324.99
8-3/8" Stabilizer Plunger float valve non ported
Crossover
Telescope
AZ.Item Comment
8½" PDC bit
PowerPack mud motor 2.38° adj. Bend.
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:Notice sent to AOGCC for BOPE test 2/11/2022 @ 08:30 for test time of 2/13/2022 @ 08:00
Load clean out tools into pipe shed,
Load clean out tools into pipe shed,
M/U Cleanout assembly, change motor bend to 2.38° deg. upload, pick up and orient MWD, pick up NM DC's,
TOOH on elevators w/ no difficulties F/6,072' MD - T/3,030' MD
Monitor well @ BHA (Static)
POH, Rack HWDP & Jars in Derrick, L/D bit, bit sub, X-O
Reconfigure wireline logging tools, M/U logging string. (Hole taking .5 bph.)
Rig up SLB logging tools. RIH with SMI DORK Sonic Neutron SPECRA Gama Ray. RIH Tool string stopped @ 6,050' wlm, Log up from
6,050' wlm to surface. Lay down logging tools, Rig down e-line. Monitor well.
Rig service. Clear & Clean rig while waiting on BHA components for cleanout run.
HSE Events:No accidents, Spills. Incident with frost bite on foot. Person evaluated by medic. Windchill: -39
Operational Details (06:00 - 06:00)
Pump Dry Job / Blow down top drive & Mud line.
24 hour Forecast:Finish picking up making up clean out assembly, RIH, Ream obstruction area @ 6,028' MD. Circulate, TOOH,
M/U Logging tools, Log per program
Wind Direction: SSW
Temp: -39
Ops @ 06:00 hrs.: Picking up clean out motor and MWD assembly Phase: 0
Wind Speed: 5
24 hour Summary:TOOH, L/D BHA/ Reconfigure logging tools/ RIH with logging tools via Wireline, make up cleanout BHA
Weather
Gen Conditions: Fair
Shoe Test: N/A N/A
1/10/22
Actual Depth: 75' 3,030 8,450' Last Evac Drill: NA
Plan Depth: 75' 3,500 9,500' Last Rig Insp.:
2/6/22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 1/17/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6430' Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/6/22
KB-GL, ft
Prog FTD md: 8,450' MD - Total Depth Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
28
Phone 1 2/13/2022
Phone 2 Tool Pusher (N): 67
API No: PTD: Field:
ft 41
ft
22 30.3
P.B.T.D.:
From To Hrs.
6:00 9:30 3:30 6
9:30 12:00 2:30 3
12:00 13:30 1:30 3
13:30 14:30 1:00 6
14:30 16:00 1:30 3
16:00 16:30 0:30 21
16:30 20:30 4:00 3
20:30 21:00 0:30 5
21:00 24:00 3:00 6
Midnight 1:00 1:00 6
1:00 3:00 2:00 9
3:00 5:00 2:00 6
5:00 6:00 1:00 6
0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
1RR4 8 1/2 PDC RR
Time Depth MW PV YP Mud Gas Readings:Used
3:00 8,450' 9.6 12 29 Rig:
15:00 8,450' 9.6 13 30 Total:
21;00 8,450' 9.6 13 30
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 96
2 Triplex 5.5 96
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 8.5 3.25 4 1/2 R 0.85
6.75 5.5 NC 50 26.95
6.75 2.75 NC 50 5.07
6.75 3.24 5.5 FH 3.45
6.75 2.25 NC50 27.34
6.75 2.25 NC50 5.10
3 X 6-3/4" Drill Collars 6.75 3.24 NC 50 89.67
Crossover 6.25 XT-39 3.45
16 jts 4" XT 39 HW 4 3.24 XT 39 484.50
Jars / Weatherford Mech 4.75 2.25 XT 39 30.39
4 jts 4" XT 39 HW 4 3.24 XT 39 121.08
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: 8,450' MD - Total Depth Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/6/22
2/6/22
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 1/17/22 6:00 AM
Casing: Conductor Surface Inter/TOC 6430' Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030 8,450' Last Evac Drill: NA
Plan Depth: 75' 3,500 9,500' Last Rig Insp.:
Ops @ 06:00 hrs.: laying down clean out BHA Phase: 0
Wind Speed: 5
24 hour Summary:RIH with 3.8° bent motor clean out assembly, clean out to 8,450', ream out to 8,372', pump out t/ 7,056', pull on
elevators to 797' stand back HWDP, lay down BHA.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW N/A
HSE Events:IFO, none reported.Windchill: -54
Operational Details (06:00 - 06:00)
RIH with 2.38 deg bent motor clean out assembly t/ 5,910'
24 hour Forecast:Finish laying down BHA, rig up logging unit RIH for sidewall core samples.
Wind Direction: SW
Temp: -41
Pump dry job, blow down TD.
POH on elevators from 7,046 t/ 4,290'
Continue POH on elevators to 2,974" during trip out hole fluid returns diminishing, hole breathing, no indication of swabbing, hole taking
proper fill at shoe 2,974'.
Cut and slip drilling line.
POH on elevators f/ 2,974 t/ 797'.
Stand back HWDP, lay down motor cleanout assembly.
Wash and ream from 5,910' to 6,099', 450 gpm, reduce pump rate to 300 gpm due to increased losses.4 rpm 7K torque
Continue wash and ream f/ 6,099' t/ 6,383,washing and rotating tight spots until clean.300 gpm @ 1,300 psi.
Blow down and RIH on elevators t/ 8,372',
Wash and ream f/ 8,372' to 8,450', 160K rot, 175K up, 150K dn, 4 rpm, 7K torque, 350 gpm @ 1,670 psi
Blow down TD, monitor well.
Attempt POH on elevators @ 8,372' observed overpulls, pump out, t/ 8,182' overpulling and packing off, rotate pipe as necessary to
mitigate packing off. Pump out w/o rotation t/ 7,046' 70 gpm @ 498 psi, 175K up, 150k dn,
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
529663
Total Hours 24:00
Comments:Notice sent to AOGCC for BOPE test 2/11/2022 @ 08:30 for test time of 2/13/2022 @ 08:00
Vis 0 Available
47 Background (Avg) % 0
Mud Properties Gas Details Fuel
48 Connection % 0
48 Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
324.99 8½" PDC bit
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Telescope
8-3/8" Stabilizer
PowerPack mud motor 2.38° bent housing
8-3/8" Stabilizer Non ported float
Crossover
Total Length (ft): 797.85
29
Phone 1 2.14.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
23 30.3
P.B.T.D.:
From To Hrs.
6:00 7:00 1:00 6
7:00 9:00 2:00 11
9:00 13:30 4:30 11
13:30 14:30 1:00 21
14:30 15:30 1:00 15
15:30 0:00 8:30 15
Midnight 3:00 3:00 15
3:00 4:00 1:00 21
4:00 5:00 1:00 12
5:00 6:00 1:00 12
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8450 9.6 13 28 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
AZ.Item Comment
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
47 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Pick up "johnny Wacker" flush and clean cuttings from BOP stack.
Pick up set tool set "Dummy Pack off', RILDS, test to 5K for 10 min good test.
Pick up landing joint and hanger, dummy run hanger, mark landing joint, lay down landing joint. Simops, rigging up casing tools to run 5
1/2" #17 P10 BTC liner.
Clear floor, rig up SBL E-line for sidewall samples.
RIH with sidewall sample tools, could not get past 4,025', rig down SBL E-line set tools down for load out.
Lay down jars, warm TD, prep to test BOPE.
Test BOPE, pull wear ring, drain stack, set test plug.
Test BOPE. Tests 250 psi low 4,500 psi high, Annular 250 psi / 2,500 psi high, rams and annular tested with 4" and 5 1/2" test joints. Pe
Sundry PTD #221-106, perform Koomey draw down test. Test witness waived by AOGCC inspector Guy Cook. Tests performed per
AOGCC and Great Bear Pantheon expectations.
Continue testing BOPE, , rig down test tools. Difficult to pull test plug,Test plug seals embedded with cuttings neck packed with cuttings.
HSE Events:None reported. IFO.Wind chill -52
Operational Details (06:00 - 06:00)
Lay down BHA #6, stand back HWDP
24 hour Forecast:RIH with 5 1/2" liner to TD, perform 2 stage cement job, Wind Direction: WSW
AM Temp: -35
Ops @ 06:00 hrs.: Dummy run landing joint and hanger, Rigging up to run 5 1/2" liner.Phase: 0
Wind Speed: 10 to 15 mph
24 hour Summary:Finish lay down clean out BHA # 6, rig up and run in SBL E-line with sidewall coring tools, run to 4,025, could not
proceed past, rig down SBL. Test BOPE., clean stack, set "dummy pack off" into well head and test,
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
1/10/22
Actual Depth: 75' 3,030' na Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/14/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/14/22 3:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
30
Phone 1 2.15.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
24 30.3
P.B.T.D.:
From To Hrs.
6:00 9:30 3:30 12
9:30 10:00 0:30 12
10:00 14:30 4:30 12
14:30 15:30 1:00 5
15:30 23:30 8:00 12
23:30 24:00 0:30 5
Midnight 1:00 1:00 5
1:00 3:00 2:00 12
3:00 5:00 2:00 5
5:00 6:00 1:00 12
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8450 9.6 13 28 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/14/22 3:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/14/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' na Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: Circulating at 128 gpm, 572 psi, landed on hanger.Phase: 0
Wind Speed: 12 MPH
24 hour Summary:Run 5-1/2" Casing.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -69
Operational Details (06:00 - 06:00)
R/U to run 5-1/2" Casing. Volant running tool, Slips, Bales, Elevators.
24 hour Forecast:Mud dilution to cut weight from 9.6 ppg to 9.2 ppg, Perform 2 stage cement job.Wind Direction: SW
AM Temp: -42
Work casing string F/8,369' MD - T/ 8,377' MD. Extreme difficulty working F/8,369' MD- T/8,377' MD. 80% losses while circulating and
attempting to work pipe down.
Could not circulate at 8,377' MD. Pick up a few feet completre circulation of bottoms up loss rate down to 8 bph.
Space out and land casing on hanger set depth 8,376' MD
Make up shoe track, Fill pipe, check floats.
Run 5-1/2" P110 17# PPF casing T/2,983' MD.
Circulate bottoms up @ 2,983' MD 130 gpm, 518 psi,
RIH W/5-1/2" Casing F/ 2,983' MD - T/ 8,302' MD. Up wt 163K, Down wt. 155K
Fill pipe, Establish Circulation. 1/2 bpm to1 bpm-210 psi
Wash down F/8,302' MD -T/8,369' MD 60 gpm, 315 psi, string taking weight at 8,369' MD
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
**Tight spots @ 4,608', 7,335'-7,400', 6,900' - 8,377' **
Total Hours 24:00
Comments:
Vis 0 Available
47 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
Total Length (ft): 0.00
31
Phone 1 2.16.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
25 30.3
P.B.T.D.:
From To Hrs.
6:00 12:00 6:00 5
12:00 15:30 3:30 5
15:30 18:00 2:30 5
18:00 22:00 4:00 12
22:00 24:00 2:00 12
Midnight 3:00 3:00 6
3:00 6:00 3:00 6
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8,376' 9.2 8 21 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
AZ.Item Comment
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
39 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Continue condition mud, reduce mud weight from 9.3# to 9.2# 4 bpm @ 570 psi.
Rig up for 1st stage cement job, tie cement line into Volant tool, blow down rig surface lines, resume circulating 3 bpm @ 554 psi.
Hold PJSM with all personnel involved with cement job. PT cement lines to 3,500 psi, mix and pump 40 bbl mud push followed by 68 bbl
15.8# cement tail slurry followed by 10 bbl water, release Volant tool, drop plug, displace with rig pumps, displace cement with 156.6 bbl.
9.2 mud @ 4 bpm @ 420 psi String pressured up. (Calculated displacement 182.25 bbl) Stop and evaluate, decided to set packer and
open diverter, pressure up on string to 3,100 psi, no indication of packer set or diverter open, pressure up to 4,500 psi, diverted did not
open, no indication of packer set.
Rig down GBR casing tools, remove landing joint, Clear tools from pipe shed.
Lay down 4" HWDP, lay down 4" drill pipe out of mouse hole.
Load 2 7/8' pipe and test joint into pipe shed, load out GBR casing tools, rig up to lay down 4" drill pipe from mouse hole
HSE Events:None reported. IFO.Wind chill -50
Operational Details (06:00 - 06:00)
Circulate condition mud for cement, Reduce mud weight from 9.6# to 9.3# 4 bpm @ 570 psi.
24 hour Forecast:Finish laying down DP, pick up clean out BHA, RIH picking up 2 7/8" tubing work string. Drill out cement plug,
clean out 5 1/2" casing.
Wind Direction: SW
AM Temp: -32
Ops @ 06:00 hrs.: Laying down drill pipe from mouse hole.Phase: 0
Wind Speed: 10
24 hour Summary:
Circulate condition mud for cement job, cut mud wt from 9.6 to 9.2. rig up and pump 1st stage cement job,
displace with rig pumps, casing pressured up early, diverter did not open, no indication of packer set. Rig down
casing tool, lay down 4" drill pipe from mouse hole.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/16/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/14/22 3:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
32
Phone 1 2.17.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
26 30.3
P.B.T.D.:
From To Hrs.
6:00 7:00 1:00 21
7:00 9:30 2:30 6
9:30 12:00 2:30 21
12:00 17:30 5:30 21
17:30 19:30 2:00 15
19:30 24:00 4:30 15
Midnight 1:30 1:30 15
1:30 2:30 1:00 14
2:30 5:30 3:00 15
5:30 6:00 0:30 6
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
AZ.Item Comment
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Could not get stack to drain through annulus valve. Pick up 4" Joint run into bottom of BOP stack blow air through 4" Drillpipe to get fluid
out of BOP's
Make several more attempts to release from pack-off with running tool. Pull Pack-off,
Make up 4-3/4" BHA assembly.
Lay down drillpipe F/ derrick via mousehole, Move 10 stands of pipe from D.S. to O.D.S. in derrick.
R/U to run 2-7/8" Tubing work string, Strap & Tally pipe, Load 4-3/4" BHA components into pipeshed, Motor, Jars, 3-1/8" Drill collars,
Change out handling equipment.
R/U Test joint to packoff running tool, Set Pack-off. Pack off would not se t initially due to cuttings in stack. Flushed and cleaned stack
repeatedly until able to set pack-off.
Fill lines & Stack with H-2/O, Function annular and purge air from system. Test Annular 250 psi low, 2,500 psi high. Test Upper variable
rams 250 psi low, 4,500 psi high. With 2-7/8" Test joint. Tests charted.
Unable to release pack off running tool from pack-off, Back off LDS pull pack off. Trobleshoot several attempts made to rerun packoff
and release from tool with no success. Sim-Ops Load pipeshed with 2-7/8" tubing and strap for tally.
Flush stack with washing tool 500 gpm, 570 psi. Blow down topdrive & mud line.
HSE Events:None reported. IFO.Wind chill -60
Operational Details (06:00 - 06:00)
Service rig, Change out hoist cable
24 hour Forecast:TIH, Picking up 2-7/8" Tubing from pipe shed, Drill out wiper plug and landing collar.Wind Direction: WSW
AM Temp: -21
Ops @ 06:00 hrs.: Picking up 4-3/4" BHA assembly.Phase: 0
Wind Speed: 22
24 hour Summary:Lay down 4" Drillpipe from derrick, Load pipeshed with 2-7/8" tubing and strap, Set pack-off, Test top pipe rams
and annular with 2-7/8" test joint. Attempt to release from packoff with no success.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/17/22 6:30 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/14/22 3:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
33
Phone 1 2.18.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
27 30.3
P.B.T.D.:
From To Hrs.
6:00 8:30 2:30 6
8:30 9:00 0:30 5
9:00 12:00 3:00 6
12:00 12:30 0:30 5
12:30 23:00 10:30 6
23:00 23:30 0:30 6
23:30 24:00 0:30 6
Midnight 3:00 3:00 6
3:00 4:30 1:30 6
4:30 5:00 0:30 21
5:00 6:00 1:00 21
0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Mill 4 3/4
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8,376' 9.2 8 21 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
3.625 1.25 8RD EUE 1.25
3.06 1.25 174.80
3.125 1.25 12.19
3.7 1.25 11.24
4.75 1.25 0.96
4.75 1.25 1.80
Total Length (ft): 202.24
3 Bladed Mill
Mud Motor
Crossover sub
6 X Spiral drill collars
HE Jar
AZ.Item Comment
Crossover sub
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
39 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
50244
Total Hours 24:00
Comments:
TOOH F/6,440' - T/BHA 202'
Lay down BHA mill, Motor, Jar, Drill collars
Clear & Clean rig floor
Inspect BHA components from run, Examine mill, Load 3-1/8" Mud motors into pipeshed (2) Organize floor for TIH Motor functional, bit
showed no damage or wear.
667' - Circulate through BHA tools 3 BPM-540 Psi. Blow down Top drive and mud line.
RIH F/667' - T/ 3,010' picking up 2 7/8" tubing from pipe shed.
Circulate bottoms up @ 3,010' 120 gpm, 672 psi. up wt. 49k down wt. 55k.
RIH F/3,010' - T/ 7,107' picking up 2 7/8" tubing from pipe shed. Tag cement stringer at 7,107'. M/U string to top drive establish
circulation, 120 gpm, 670 psi, Tag stringer with 4k bit weight 300 psi differential. Begin to wash down F/7,107' (Joint #221 + 23.5' in). drill
to 7,120", unable to progress beyond progress @ 7,201', saw 200 psi differential pressure but no drill off.
Break EUE 8rd. X XT-39 Crossover out of tubing joint, Lay down tubing joint (# 223)
TOOH F/7,199' - T/6,440'
HSE Events:None reported. IFO.Wind chill -40
Operational Details (06:00 - 06:00)
Pick up 4 3/4" mill, motor cleanout assembly. RIH picking up 2 7/8", 6.5# EUE tubing from pipe shed T/667'.
24 hour Forecast:TIH drill cement to DV clean out assembly. Drill pilot through DV Wind Direction: N.E.
AM Temp: -20
Ops @ 06:00 hrs.: Rig prepping for TIH Phase: N/A
Wind Speed: 10
24 hour Summary:Make up 4-3/4" BHA, RIH picking up 2-7/8' EUE 8rd tubing from pipeshed, Tag up on wiper plug and landing
collar. Clean out to 7,201' , POOH, Lay down BHA inspect same,
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/18/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/14/22 3:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian & Al Hanson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
34
Phone 1 2.19.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
28 30.3
P.B.T.D.:
From To Hrs.
6:00 9:30 3:30 6
9:30 14:00 4:30 6
14:00 15:00 1:00 2
15:00 17:00 2:00 5
17:00 17:30 0:30 5
17:30 18:00 0:30 6
18:00 19:30 1:30 2
19:30 20:00 0:30 2
20:00 20:30 0:30 5
20:30 21:00 0:30 5
21:00 23:30 2:30 6
23:30 24:00 0:30 6
Midnight 6:00 6:00 14
0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
9 4 3/4 Milltooth 7199
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 3.625 1.25 8RD EUE 1.25
3.06 1.25 174.80
3.125 1.25 12.19
3.7 1.25 11.80
4.75 1.25 0.96
4.75 1.25 0.47
Total Length (ft): 201.47
Milltooth bit Baker Hughes, roller cone, s# 7202
Mud Motor
Crossover sub
6 X Spiral drill collars
HE Jar
AZ.Item Comment
324.99 Crossover sub
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Drill cement F/7,209' - T/7,224' with no difficulties no motor stalling, 20' to 30' ROP, 143 gpm,1,530 psi, 5-6k bit wt.
Circulate, Pump dry job
L/D Joint # 223, Break outXT-39 x 8rd EUE crossover,
POOH F/7,206' racking back in derrick, to BHA 201'
Lay down BHA # 9
Drain and clean stack with water, observed debris in hanger, pick up johnny wacker and flush stack with rig pumps, drain stack, still
debris in hanger profile, Attempt to set packoff, No Go, packoff would not seat, pull out, found cement on bottom of pack-off, not allowing
it to seat., Fill stack w/H-2/0 pull hanger to jet hanger area as it pulls out, hanger still packed with debris, Power washer rigged up & Run
in stack, Power wash hanger area,
Make up 4 3/4" bit, motor clean out BHA, RIH with 2 7/8" tubing from derrick.
Drill out / clean out rubber, plug and cement F/ 7,201' to 7,206'
work pipe observed overpulls and motor stalls on bottom @ 7,206'
blow down top drive, pull 3 stands attempt to wipe BHA
Run back to 7,206'
Drill cement T/7,209' several motor stalls with little bit weight applied
HSE Events:None reported. IFO.Wind chill -49
Operational Details (06:00 - 06:00)
Service rig clean rig floor.
24 hour Forecast:Drill out cement from 7,224' to float collar @ 8,287'Wind Direction: South West
AM Temp: -30
Ops @ 06:00 hrs.: Setting Pack-off into well head Phase: N/A
Wind Speed: 9
24 hour Summary:
Service rig gather tools, RIH with 4.75" bit and motor, clesn out to 7,224', POH, set well head pack off and test,
Pick up Baker motor assembly with 4.75" bit, RIH T/7,199', drill cement F/7,199' - T/7,224', POH, lay down DC's
motor and bit.attempt to set well head pack off.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/18/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/14/22 3:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hanson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
35
Phone 1 2.20.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
29 30.3
P.B.T.D.:
From To Hrs.
6:00 12:00 6:00 21
12:00 14:00 2:00 21
14:00 16:30 2:30 21
16:30 18:00 1:30 6
18:00 20:30 2:30 6
20:30 1:00 4:30 2
1:00 6:00 5:00 2
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
9 4 3/4 Mill tooth 7199
Time Depth MW PV YP Mud Gas Readings:Used
6:00 7238 9.2 5 17 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 3.625 1.25 8RD EUE 1.25
3.06 1.25 174.80
3.125 1.25 12.19
3.7 1.25 11.80
4.75 1.25 0.96
4.75 1.25 0.47
Total Length (ft): 201.47
Mill tooth bit Baker Hughes, roller cone, s# 7202
Mud Motor
Crossover sub
6 X Spiral drill collars
HE Jar
AZ.Item Comment
324.99 Crossover sub
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
66 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Continue cleaning and washing wellhead to set pack-off, Set pack-off into hanger, would not land, pull pack-off.
Test pack-off to 250 psi / 4,500 psi, chart, good test. Rig down tools blow down lines and top drive.
Pick up and make up 4 3/4" bit and motor assembly, RIH with 2 7/8" tubing from derrick t/ 850'
Continue RIH f/ 850' to 7,223',
After several motor stalls begin drilling f/ 7,223' to clean out depth of 7,224.Drill cement from 7,224' to 7,228'. From 7,228 to 7,231 test
casing to 500 psi every foot drilled, from 7,231' to 7,238' test casing to 500 psi every 2' drilled. No communication observed @ 9 5/8"
x 5 1/2" annulus during tests. Drilling off bottom psi =672 psi @ 120 gpm. 74k up 76K dn wt.
Drilling @ 7,238' motor stalling, drilling difficult, work drilling parameters to make progress, observed aluminum and cement returns @
shakers.
Cleaning out hanger profile, Make up pressure washer, run into stack and pressure wash hanger would not land, pick up mill pipe, wash
hanger cleared debris, set pack off, RILDS
HSE Events:None reported. IFO.Wind chill -63
Operational Details (06:00 - 06:00)
24 hour Forecast:Drill DV collar, test casing, drill and clean out to casing float collar @8,286'Wind Direction: ENE
AM Temp: -43
Ops @ 06:00 hrs.: Drilling junk and cement @ 7,238'Phase: 0
Wind Speed: 5
24 hour Summary:Clean hanger, set and test well head pack off, pick up 4 3/4" bit and motor assembly, RIH on 2 7/8" tubing to
7,224', drill cement testing casing every 1 to 2 foot, to 7,238'.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/202022 6:00:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/14/22 3:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hanson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
36
Phone 1 2.21.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
30 30.3
P.B.T.D.:
From To Hrs.
6:00 9:30 3:30 2
9:30 11:45 2:15 2
11:45 12:00 0:15 2
12:00 14:30 2:30 2
14:30 14:45 0:15 2
14:45 18:00 3:15 2
18:00 24:00 6:00 2
Midnight 6:00 6:00 2
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
9 4 3/4 Mill tooth 7199
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8,376' 9.2 7 24 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 3.625 1.25 8RD EUE 1.25
3.06 1.25 174.80
3.125 1.25 6.56
3.7 1.25 2.27
3.125 1.25 1.15
3.7 1.25 10.73
4.75 1.25 0.96
4.75 1.25 0.50
Total Length (ft): 198.22
Mill tooth bit
Baker X-Treme mud motor Baker Hughes, roller cone, s# 7202
Crossover sub
TJ Disconnect
Circulating sub
6 X Spiral drill collars
G Force jar
AZ.Item Comment
324.99 Crossover sub
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
46 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:AOGCC notified for BOPE test 2/20/2022 @ 10:00 AM, **Witness waived by AOGCC Inspector Matt Herrera @15:07, 2/20.22
Drill cement f/ 7,518' t/7,777' circulating/clean well head and stack each connection. 120 gpm = 1,260 psi, 5k wob 200 psi differential
Drill cement F/7,238' - T/ 7,250' 2-5k WOB 120 gpm, 735 psi Test 500 psi on outer annulus. No leak detected in O.A.
Drill cement F/7,250' - T/ 7,251' 2-5k WOB 120 gpm, 200-300 differential pressure on motor. 735 psi Test 500 psi on outer annulus. No
leak indetected in O.A.
Drill cement F/7,251' - T/ 7,291' 2-5k WOB 120 gpm, 735 psi, (200-300 differential pressure on motor.)
Circulate through kill line to increase annular velocity in BOP stack, Large cuttings load increase visible at shakers. 6 bbl's minute rate.
Drill cement f/ 7,291' t/ 7,355'
Drill cement f/ 7,355' t/7,518', circulating/clean well head and stack each connection. 120 gpm with 765 / 800 psi. 2/5K wob. 75k dn 74k up
wt. 2 7,552' pump pressere increased to 1,230 psi (plugged jet).
HSE Events:None reported. IFO.Wind chill -25
Operational Details (06:00 - 06:00)
Drill cement F/7,237' - T/ 7,238' 2-5k WOB 120 gpm, 735 psi Test 500 psi on outer annulus. No leak detected in O.A.
24 hour Forecast:Drill and clean out casing to float collar @ 8,287', POH, perform CBL.Wind Direction: ESE
AM Temp: -21
Ops @ 06:00 hrs.: Drilling cement @ 7,777'Phase: 0
Wind Speed: 5
24 hour Summary:Drilling cement with 4 3/4" bit in 5 1/2" casing f/ 7,237' to 7,777'
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/21/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/14/22 3:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hanson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
37
Phone 1 2.22.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
31 30.3
P.B.T.D.:
From To Hrs.
6:00 12:00 6:00 2
12:00 17:00 5:00 2
17:00 19:30 2:30 5
19:30 23:30 4:00 6
23:30 24:00 0:30 15
Midnight 1:00 1:00 15
1:00 2:00 1:00 21
2:00 6:00 4:00 15
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
9 4 3/4 Mill tooth 7199 8,285' 1,068
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8,285' 9.4 6 22 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 3.625 1.25 8RD EUE 1.25
3.06 1.25 174.80
3.125 1.25 6.56
3.7 1.25 2.27
3.125 1.25 1.15
3.7 1.25 10.73
4.75 1.25 0.96
4.75 1.25 0.50
Total Length (ft): 198.22
BHA Laid down at 23:30 2/21/22
Mill tooth bit
Baker X-Treme mud motor Baker Hughes, roller cone, s# 7202
Crossover sub
TJ Disconnect
Circulating sub
6 X Spiral drill collars
G Force Jar
AZ.Item Comment
324.99 Crossover sub
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
Vis 0 Available
40 Background (Avg) % 0
Mud Properties Gas Details Fuel
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
7202 2-2-0-NO-A-E-TD
Total Hours 24:00
Comments:AOGCC notified for BOPE test 2/20/2022 @ 10:00 AM, **Witness waived by AOGCC Inspector Matt Herrera @15:07, 2/20.22
Test BOPE 250 low / 4,500 psi high, Annular 250 low 2,500 high, on 2 7/8" test joint. All tests charted.
Drill cement f/ 8,038' t/8,285'. 2.5' above float collar. 120 gpm = 1,260 psi, 5k wob 200 psi differential * circulating/clean well head and
stack every 3rd. Connection*
Circulate cement cuttings out of wellbore, circ hole clean, pump dry job.
POH, Stand back 2 7/8" tubing, lay down drill collars and clean out BHA.
Test choke manifold 250 / 4,500 psi. Set T.W.C.
Continue testing choke manifold 250 low/ 4,500 high
Flush stack with wash tool, drain stack, fill with water.
HSE Events:None reported. IFO.Wind chill -5
Operational Details (06:00 - 06:00)
Drill cement f/ 7,777' t/8,038' . 120 gpm = 1,260 psi, 5k wob 200 psi differential * circulating/clean well head and stack every 3rd.
Connection*
24 hour Forecast:Complete BOP test, lay down 4" Dp, Rig up E-Line for CBL logs.Wind Direction: SSE
AM Temp: 5
Ops @ 06:00 hrs.: Testing BOPE per AOGCC and Great Bear Pantheon expectations.Phase: N/A
Wind Speed: 13
24 hour Summary:Drill cement f/7,777' t/8,285' - 3' from top of float collar. Circulate clean, TOOH, Rig up & test BOPE.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/22/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hanson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
38
Phone 1 2.23.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
33 30.3
P.B.T.D.:
From To Hrs.
6:00 12:00 6:00 15
12:00 18:00 6:00 11
18:00 22:00 4:00 11
22:00 24:00 2:00 11
Midnight 6:00 6:00 11
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8450 9.4 6 22 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hanson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/22/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: Rigging down SBL E-Line Phase: 0
Wind Speed: 22
24 hour Summary:Testing BOPE, rig up Schlumberger E-Line & perform CBL log,
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -19
Operational Details (06:00 - 06:00)
Continue testing BOPE, 250/4,500 psi. upper VBR pipe rams would not test, Change out top rams with bottom rams.
24 hour Forecast:Lay down 4" DP from derrick out of mouse hole.Wind Direction: West
AM Temp: 8
Continue testing BOPE, Installed 2-7/8" X 5-1/2" rams in bottom. Top rams good test, Bottom rams did not test. New rams are being
sourced.
Continue logging operation, perform USIT, CBL, Spectrial Gamma, CCL from 8,224' to 5,400' ,
Continue logging operation, perform USIT, CBL, Spectrial Gamma, CCL from 8,224' to 5,400' , repeat pass, POH, rig down SBL wire E-
line.
Schlumberger on location, rig up for running logs to perform USIT, CBL, Spectrial Gamma, CCL.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
41 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
324.99
Total Length (ft): 0.00
39
Phone 1 2.24.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
34 30.3
P.B.T.D.:
From To Hrs.
6:00 6:30 0:30 21
6:30 7:00 0:30 21
7:00 8:00 1:00 22
8:00 9:30 1:30 16
9:30 10:00 0:30 21
10:00 14:30 4:30 22
14:30 16:30 2:00 15
16:30 17:00 0:30 15
17:00 22:00 5:00 22
22:00 24:00 2:00 5
Midnight 6:00 6:00 5
0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hanson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig / Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Jake Henry Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/22/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: Bleed well from circulating annulus, monitor returns,Phase: N/A
Wind Speed: 9
24 hour Summary:
Rig down SBL CBL logging tools, lay down 4" out of derrick from mousehole, attempt to set casing packer,
confirmed DV open, install rams in lower body and test, continue laying down 4' drill pipe, circulate 5 1/2" X 9 5/8"
annulus for cement job.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -26
Operational Details (06:00 - 06:00)
R/D wireline Sheaves, Send down Logging tools.
24 hour Forecast:Monitor returns, Pick up and make up 5 1/2" CIBP, RIH on 2 7/8" tubing to 7,127' set and cement per plan.Wind Direction: NE
AM Temp: -13
Pull TWC, blow down surface lines, rig down test equipment.
Lay down 4" drill pipe out of derrick from mouse hole.
Rig up to circulate 9 5/8' X 5 1/2' annulus
Pump down 5 1/2' casing with 9 5/8" annulus to pits, 1/2 bpm = 1,120 psi, pump 10 bbl, no returns. Swap lines to pump down annulus,
pump 38 bbl @ 2 bpm, no returns. Swap back to pumping down 5 1/2" casing, stage pumps up to 2 bpm observed returns, 2 bpm @
1,335 psi 70% losses temp 41° returns. Return losses reduces to 25% @ 43° returns. Increase rate to 3 bpm @ 1,370 psi, began with
36% losses reducing to 13% with 65° returns. increase rate to 4 bpm @ 1,390 psi, with 13% losses. 9.2# in 9.2# out, losses reduced t/
7.5% @ 4 bpm @1,255 psi. @ 70°. Increased pump rate to 5 BPM @ 1,329 psi. initial losses 37%, losses reduced to FCP of 1,295 with
7% losses @ 77° . Total losses to hole circulating 245 bbl. 108 bbls mud volume at end of circulating.
Blow down choke & Kill line, Clear & Clean floor, Prep to lay down 4" from Derrick
Lay down 4" Drillpipe from derrick.
Rig up to inflate downhole inflatable packer, Close blind rams pump down kill line attempt to obtain 1,500 psi to inflate packer. Pressure
bleed off at 1,300 psi. Open 9-5/8" X 5-1/2" Annulus valve confirm flow. Confirming D.V. collar is open.
Blow down Kill and surface lines.
Lay down 4" drill pipe from derrick.
Drain stack, install 2 7/8" rams in lower sng. gate, fill stack with water, test lower rams to 250/4,500 psi.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:Load pipe shed with 43 joints 3 1/2" 9.2 # L-80 Vam Top liner.
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
324.99
Total Length (ft): 0.00
40
Phone 1 2.25.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
35 30.3
P.B.T.D.:
From To Hrs.
6:00 7:30 1:30 5
7:30 8:30 1:00 5
8:30 12:00 3:30 6
12:00 14:00 2:00 6
14:00 17:00 3:00 5
17:00 19:00 2:00 5
19:00 21:00 2:00 5
21:00 21:30 0:30 5
21:30 24:00 2:30 6
Midnight 2:30 2:30 6
2:30 6:00 3:30 6
0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8450 9.2 6 20 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 4.73 na 2 3/8" reg 1.47
3.13 na 2 3/8" reg 10.73
3.13 0.69 2 3/8" reg 1.15
3.13 0.81 3 3/8" reg 2.27
3.13 1.25 2 3/8" reg 6.56
3.38 1
2 3/8" reg
X 2 3/8"
IF pin
0.62
3.4 1.65 2 3/8" IF 172.07
3.38 1.62
2 3/8 reg
X 2 3/8"
IF pin
0.66
3.625 1
2 7/8 eue
box X 2
3/8" pin
0.71
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Al Hanson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/22/2022 18:00:00 PM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: T.I.H. @ 7,067'Phase: 1.5
Wind Speed: 40
24 hour Summary:Monitor well returns, RIH with 5 1/2" CIBP, set and cement, POH, lay dn set tool, Pick up 4.73" junk milling
assembly, RIH on 2 3/8" tubing. t/ 6,308
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -34
Operational Details (06:00 - 06:00)
Shut down pumping monitor returns. Returned 126 bbls in 1 hour, continue monitoring returns, Total mud returned 128 bbl
24 hour Forecast:Drill CIBP @ 7,127', clean out 5 1/2" casing to 8,285'. change over well to 3% KCL brine. POH, E-Line CBL .Wind Direction: ENE
AM Temp: -12
Pump dry job
POH lay down CIBP setting tool.
Pick up and make up Baker motor 4.73" 5 blade junk, milling assembly and 6 each 3.4" OD DCs.
RIH with 4 3/4" milling assembly t/ 6,308'
Rig down and blow down surface lines
Pick up CIBP and setting tool, RIH to 3,384'
Continue RIH with 5 1/2" CIBP to 7,127'
Pump down tubing 1 bpm @ 438 psi, stop pumping, drop ball, rig up surface lines to circ. Set CIBP with 2,127 psi. stage pumps up
to 2,491 psi, set 25K down on CIBP.
Rig up SLB cementers, pump 5 bbl. water, test lines to 4,500 psi. pump 36.1 bbl 9.8# mud push, 70.6 bbl 13# lead cement, 41.8 bbl
15.8# tail, displace with 40.7 bbl water. CIP 19:00 hrs.
Unsting from CIBP with 670 psi on tubing, 75K up wt. Pull up to 7,098' circ. hole surface to surface @ 6 bpm @ 2,300 psi. No
cement returns, (max PH = 11.5 @ 10.2#)
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
41 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
X-Treme mud motor
Dual Circ Sub
AZ.Item Comment
324.99 5 Blade Junk Mill
X O
6 each, DC
TJ Disconnect
G-Force jar
X O
X O
Total Length (ft): 196.24
41
Phone 1 2.26.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
36 30.3
P.B.T.D.:
From To Hrs.
6:00 8:00 2:00 6
8:00 9:00 1:00 21
9:00 10:45 1:45 22
10:45 12:00 1:15 21
12:00 14:30 2:30 21
14:30 24:00 9:30 23
Midnight 2:00 2:00 23
2:00 3:00 1:00 21
3:00 5:00 2:00 21
5:00 6:00 1:00 6
0:00
0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 845 9.4 8 20 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 4.73 na 2 3/8" reg 1.47
3.13 na 2 3/8" reg 10.73
3.13 0.69 2 3/8" reg 1.15
3.13 0.81 3 3/8" reg 2.27
3.13 1.25 2 3/8" reg 6.56
3.38 1
2 3/8" reg
X 2 3/8" IF
pin
0.62
3.4 1.65 2 3/8" IF 172.07
3.38 1.62
2 3/8 reg
X 2 3/8" IF
pin
0.66
3.625 1
2 7/8 eue
box X 2
3/8" pin
0.71
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Al Hansen Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/22/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: RIH with motor/ mill clean out assembly @ 7,832'Phase: N/A
Wind Speed: 25 t/ 30
24 hour Summary:P/U Milling assembly, TIH, Mill cement & Retainer, Wait on weather, resume drilling cement. t/ 7,218' RIH
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -23
Operational Details (06:00 - 06:00)
TIH F/6,308' tag cement at 7,113' 14' of cement on top of retainer. 1/4 bbl. Was dropped out of pipe when stinging out of retainer
24 hour Forecast:Clean out cement to float collar, circ hole clean, change over well to 3% KCL brine. POH, rig up SBL to run CBL.Wind Direction: ENE
AM Temp: -10
Winds subsiding, visibility >1/2 mile, coms up, resume rig operations. Lay down singles from string, run stands out of derrick to drill.
Drill cement f/ 7,161' t/ 7,218' 3 - 5 K wob.120 gpm @ 1,100 psi, off bottom 1,400 /1,300 psi on bottom psi. Wash to 7,250'
Blow down top drive, RIH on elevators t/ 7,832'
Drill cement F/ 7,113' - T/ 7,126' 107 gpm, 992 psi, 2-4k bit wt. up wt. 72k, down wt. 75k.
Drill retainer 2-6k bit weight, 125 gpm, 1,565 psi. Retainer 7,126'- 7,128'
Drill cement F/ 7,128' - T/ 7,129' 120 gpm, 1,280 psi, 3-5 k bit wt.
Drill cement F/ 7,129' - T/ 7,161' 120 gpm, 1,450 psi, 3-5 k bit wt. 330 psi differential pressure on mud motor.
Stop operations due to weather, Extreme high wind, Low visibility, Snow drifting, No ice road travel due to road conditions.
Continue with no rig operations, limited visibility, no coms or road access due to high winds and blowing snow.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
41 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
X-Treme mud motor
Dual Circ Sub
AZ.Item Comment
324.99 5 Blade Junk Mill
X O
6 each, DC
TJ Disconnect
G-Force jar
X O
X O
Total Length (ft): 196.24
42
Phone 1 2.27.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
37 30.3
P.B.T.D.:
From To Hrs.
6:00 7:30 1:30 6
7:30 9:00 1:30 5
9:00 13:00 4:00 21
13:00 18:00 5:00 5
18:00 21:00 3:00 5
21:00 23:30 2:30 5
23:30 2:30 3:00 6
2:30 4:00 1:30 6
4:00 6:00 2:00 11
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8450 9.4 8 20 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8 4.73 na 2 3/8" reg 1.47
3.13 na 2 3/8" reg 10.73
3.13 0.69 2 3/8" reg 1.15
3.13 0.81 3 3/8" reg 2.27
3.13 1.25 2 3/8" reg 6.56
3.38 1
2 3/8" reg
X 2 3/8"
IF pin
0.62
3.4 1.65 2 3/8" IF 172.07
3.38 1.62
2 3/8 reg
X 2 3/8"
IF pin
0.66
3.625 1
2 7/8 eue
box X 2
3/8" pin
0.71
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Al Hanson Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/27/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: Rigging SBL for logs Phase: 0
Wind Speed: 22
24 hour Summary:Clean put 5 1/2" casing to 8,284', circulate, change well over to 3% KCL, POH, Rig up SBL E-Line.
Weather
Gen Conditions: Partly cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported, IFO Wind chill -20
Operational Details (06:00 - 06:00)
Continue RIH on elevators F/ 7,832' with 4 3/4" mill and motor clean out assembly T/ 8,256' Wash down F/ 8,256' - T/ 8,284' 120
gpm, 1,246 psi.
24 hour Forecast:Complete CBL log, test BOP with 3 1/2", pick up 3 1/2" liner and setting tools, RIH, set and cement liner per
program.
Wind Direction: E
AM Temp: -9
Lay down clean out BHA #12.
Rig up SBL E-Line for CBL, USIT, MSIP.
Circulate any excess cement cuttings out of hole @ 120 gpm 1,240 psi. 3,038 strokes pumped.
Blow down top drive & mud lines. Install TIW valve. Wait on roads to be cleared of snow drifts caused by high winds for Vac truck with
Brine.
Drop ball to open circulating sub in string. Circulate while cleaning pit and making spacer pill.
Continue cleaning pits, mix high vis spacer.
Change over well bore to 3% KCL, pump 35 bbl high vis spacer, pump KCL to surface. 5 bpm @ 2,140 psi.
POH, standing back 2 7/8" tubing.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
40 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
X-Treme mud motor
Dual Circ Sub
AZ.Item Comment
324.99 5 Blade Junk Mill
X O
6 each, DC
TJ Disconnect
G-Force jar
X O
X O
Total Length (ft): 196.24
43
Phone 1 2.28.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
38 30.3
P.B.T.D.:
From To Hrs.
6:00 14:00 8:00 21
14:00 22:00 8:00 15
22:00 6:00 8:00 11
0:00
0:00 0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8,285' 8.45 2 1 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Al Hansen Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/22/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: Rigging down SLB logging Phase: 0
Wind Speed: 10
24 hour Summary:Trouble Logging, Trouble testing BOPE, SBL log,
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -22
Operational Details (06:00 - 06:00)
Computer malfunction in wireline unit. Replace computer.
24 hour Forecast:Pick up Baker 3 1/2" liner tools, pick up 3 1/2" liner, RIH, set and cement liner.Wind Direction: SW
AM Temp: -5
Set Two way check , Test upper rams with 3-1/2" test joint. Would not test, Pull Test joint, Attempt to test blind rams would not test, Attempt
to pull two way check for inspection, Debris on top of two way check, Suck out stack run power washer in on T-Bar to dislodge debris from
top of two way check, attempt to pull two way check, Would not pull. Repeat process until two way check pulled.
Logging with SBL E-Line for CBL, USIT, MSIP. Running in hole encountered obstruction @ 7,770' wlm, pulled free with 8K over pull, log up
from 7,740' wlm. Run repeat pass. POH with E-Line tools.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
27 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
324.99
Total Length (ft): 0.00
44
Phone 1 3.1.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field: 14
8,450' ft
0ft
39 30.3
P.B.T.D.:
From To Hrs.
6:00 8:30 2:30 11
8:30 11:30 3:00 15
11:30 14:00 2:30 12
14:00 15:30 1:30 12
15:30 21:00 5:30 5
21:00 23:00 2:00 6B
23:00 1:00 2:00 12
1:00 2:00 1:00 12
2:00 2:30 0:30 5
2:30 3:30 1:00 12
3:30 6:00 2:30 6B
0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8,285' 8.45 2 1 Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Al Hansen Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/23/2022 17:00:00 PM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# 3 1/2" Last Safety Mtg: 3/1/22 6:00 AM
Casing: Conductor Surface Intermediate Tie Back liner Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' 8,277 Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,284 Last Rig Insp.:
Ops @ 06:00 hrs.: Laying down liner running tool.Phase: 0
Wind Speed: 3
24 hour Summary:Finish SBL CBL E-Line logs, test BOP upper rams and annular with 3 1/2" test joint. Pick up and run 3 1/2" liner,
cement liner in place, clean hole, POH. Lay down liner running tool.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na na
HSE Events:None reported. IFO.Wind chill -1
Operational Details (06:00 - 06:00)
Wireline logging, Repeat pass, T.O.O.H. with logging tools on wireline. Rig down, lay down tools from run.
24 hour Forecast:Pick up liner packer with seal assembly, RIH, stab into liner top, set packer and test packer and liner to 3,500 psi,
POH laying down 2 7/8" tubing. Freeze protect 5 1/2" casing
Wind Direction: E
AM Temp: -1
Rig up cementers, pump 10 bbl h2o, PT lines to 4,500 psi, batch and pump 16 bbl #15.8 cement followed with 55 bbl 3% KCL, pick up 15
to expose dog assembly from the 3" seal bore, slack off set 10K wt. 10' higher in tool, set pump trips for 1,500 psi, launch "Pee Wee"
dart, hold pressure, pick up to open Side Exhaust Ports (indicated by loss of pressure), pump 5 bbl, (2.5 bbl cmt. through exhaust ports),
slack off close exhaust port, pick up liner wiper plug, bump plug with10.5 bbl , with 2,700 psi, open bleeder check floats, holding,
pressure up to 1,500 psi, pull out of tool, (indicated by loss of pressure). pump 5 bb. with cement unit to clear liner tools of cmt., switch to
rig pumps. CIP @ 02:13.
Circulate bottoms up with rig pumps @ 5 bpm @ 1,720 psi. Indications of cement contamination @ bottoms up.
Rig down and blow down cement and surface lines.
POH with 2' liner running tool, standing back 2 7/8" tubing work string lay down liner running tool.
Test upper 2-7/8" X 5-1/2 Variable pipe rams 250 psi low , 4,500 psi high with 3-1/2" test joint, 10 min. per test test charted, Test Annular
250 psi low, 2,500 psi high, 10 min per test charted. (All tests good.)
R/U and run 38 joints 3-1/2" 9.2# Vam top liner. Shoe track assembly with liner deployment sleeve. (1,243.51')
RIH with completion liner on 2-7/8" tubing from derrick f/ 1,243' t/ 8,000'
Prep for cement and blow air through surface lines. Rig up manifold for cement job. (Cement unit delayed due to mechanical issues,
arrived on location @ 20:00)
RIH with liner f/ 8,000' , tag at 8,275', wash to hard bottom @ 8,277'. 2.5 bpm @ 758 psi.
Drop 5/8" ball to set BSE Liner Running Tool, let fall 30 min, pump @ 1 bpm 3 bpm @167 psi, raise rate to 2 bpm @ 463 psi, 3 bpm @
780 psi, circ 1.5 tubing volume with no indication of ball on seat. Drop 3/4" ball, seat and set BSE-LRT with 2,600 psi. TOL = 7,033'
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:3 1/2" Liner top set @ 7,033' 3 1/2" shoe set @ 8,277'
Vis 0 Available
27 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
324.99
Total Length (ft): 0.00
45
Phone 1 3.2.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
40 30.3
P.B.T.D.:
From To Hrs.
6:00 11:00 5:00 6
11:00 12:30 1:30 21
12:30 12:45 0:15 21
12:45 15:30 2:45 6
15:30 16:30 1:00 21
16:30 17:00 0:30 6
17:00 18:30 1:30 5
18:30 24:00 5:30 6B
Midnight 6:00 6:00 14
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
21:00 8,285' 8.45 2 1 Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Al Hansen Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 2/22/22 6:00 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: Nipple down BOPE Phase: 0
Wind Speed: 5
24 hour Summary:
RIH with 5 1/2" liner tie back packer and seal assembly, set and test pkr and casing, POH laying down 2 7/8"
tubing, freeze protect well with diesel, continue POH laying down 2 7/8" tubing work string. Set TWC, nipple down
BOPE.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -9
Operational Details (06:00 - 06:00)
R.I.H. with production packer T/7,026' 70k up 75k down wt.
24 hour Forecast:Nipple down BOPE, nipple up frac tree, rig down and prep rig to move to Deadhorse.Wind Direction: SSW
AM Temp: 5
POH laying down 2 7/8" tubing.
Set Two Way Check, nipple down BOPE.
Set packer hydraulically with 2,200 psi. Pull test 40k over (115k) Stack wt. (30k) Verifying packer set. Space out in stack, Close top pipe
rams, Attempt to test casing and packer pumping down kill line, Fluid returning up tubing string once pressure reached 1,120 psi.
Release from Production packer with 20 revolutions to the right. Pick up with no overpull verifying string off packer.
Blow down top drive, choke & kill lines.
Lay down 2-7/8' T.O.O.H. to pipeshed, F/6,996' - 4,955'
Test 5-1/2" Casing and production packer T/3,500 psi - 30 minutes, Charted test.
Run 10 stands F/Derrick in the hole F/4,955' - T/5,915'
R/U Little Red pump 32 bbls. Diesel for freeze protect, Chase with 17.5 bbls. Brine. Blow down all circulating lines.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
27 Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
324.99
Total Length (ft): 0.00
46
Phone 1 3.3.22
Phone 2 Tool Pusher (N): 69
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00 14
18:00 6:00 12:00 2
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
1 Triplex 5.5 60 97 1
2 Triplex 5.5 60 97 2
MD TVD Inc.OD ID Conn. Length
8370 8369.03 0.8
Report #:
Supervisor (D): Mark Brouillet (907) 631-9850 Tool Pusher (D): Brian Pederson Report Date:
Daily Drilling Report
Well Name:THETA WEST #1 Rig/Contractor: Nordic #3 Well Type: Exploration
Supervisor (N): Paul Smith Al Hansen Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Spud: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Spud to TD): GL, ft
Progress: Cum. Cost: Spud Date: 1/22/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" Last BOP Test: 2/22/22 7:00 AM
OD/Weight 20"/129# 9-5/8" / 40# 5½" / 17# Last Safety Mtg: 3/3/22 5:30 AM
Casing: Conductor Surface Intermediate Last BOP Drill:
1/10/22
Actual Depth: 75' 3,030' 8,376' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' Last Rig Insp.:
Ops @ 06:00 hrs.: Prep rig for move rig off well.Phase: 0
Wind Speed: 5
24 hour Summary:Nipple down BOPE, nipple up Frac tree, pull TWC, top off tree with diesel for freeze protect, Rig down prep to
move rig off well.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -3
Operational Details (06:00 - 06:00)
Continue nipple down BOPE. Set BOPs back on rig stump. Nipple up 5" Frac tree, freeze protect with diesel, test tree to 5,000 psi, 10
min test Good, Pull BPV. Install 1002 cap. Secure well.
24 hour Forecast:Move rig off well, pick up matting boards, continue to prep rig for demobe to Deadhorse. Move rig down ice road.Wind Direction: S
AM Temp: -3
Clear cellar and pipe shed of GBP tools and equipment. Warm up moving system. Clean cellar and rig of fluids. Remove rig containment,
blow down cellar and substructure. Prep to move rig off well.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Pump Data Slow Pump Rates
Model
Continental Emsco
Continental Emsco
Surveys BHA
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
324.99
Total Length (ft): 0.00
SECTION 3.
Daily Completion Reports
1
Phone 1 3.7.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
OD/Weight 20"/129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Continue moving operations to Theta West pad. Spotting frac tanks, CT, & finalize Expro equipment (75% rigged
up). Cruz moving heaters to Theta & grooming snow as equipment is removed.
Phase: 0
Wind Speed: 5
24 hour Summary:Begin moving operations to Theta West location from Talitha location. Theta location cleaned & graded. Walked
pad & spotted for new rigup. Validated rigup for Yellowjacket wireline & equipment/function for slim hole tools.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO. Wind chill -16
Operational Details (06:00 - 06:00)
Load remaining drilling equipment on Theta West onto trailers & load out. Clean/groom pad. Begin moving Expro compound/tanks & SLB
coiled tubing. Go to Deadhorse & confirm parts & function with Yellowjacket regarding slimhole plugs/setting tools.
24 hour Forecast:Finalize moving Ops to Theta West pad. Rig up SLB Frac as much as possible. Begin moving teardown of Camp
Kickass & move all comms/supplies to Galena Camp.
Wind Direction: N
AM Temp: -5
Continue Expro rigup on Theta pad. Move heaters & light plants to Theta. Groom Talitha & prep for camp move.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Comments:
Vis 0 Available
Background (Avg) % 0
Mud Properties Gas Details Fuel
Connection % 0
Trip Gas % 0 Volume Delivered: 0
AZ.Item Comment
Pump Data Slow Pump Rates
Model
Surveys BHA
Total Length (ft): 0.00
2
Phone 1 3.8.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Flowback rigging up on Theta, fueling & location grooming Ops Phase: 0
Wind Speed: 11
24 hour Summary:Continue relocation operations to Theta West. Only Lil Red, one Expro tank & some dunnage remain at Talitha
location. Expro 80% in place & rigged up. Theta location clean, graded & wellhead clear
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO. Wind chill -23
Operational Details (06:00 - 06:00)
Theta location cleared & groomed. Expro 80% in place. Continue moving Talitha to Theta location. Only co man camp, lil read & single
Expro tank remain at Talitha.
24 hour Forecast:SLB frac to set tanks, sand bins & spot available units. Expro to get 100% rigged up. YJ Wireline set to AOL to
perforate BFF Stage 1(8065-75'). Will run temp survey & gauge ring then perforate. Pump small DFIT after
Wind Direction: SW
AM Temp: -5
Total Hours 24:00
Spot CT unit @ wellhead. Continue moving locations. Fueling available units. Cruz maintaining road & moving light plants/heaters to next
location.
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
3
Phone 1 3.9.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 11:00 5:00
11:00 21:00 10:00
21:00 1:00 4:00
1:00 6:00 5:00
6:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
RIH w/2.75" GR to 8170' (no stick); RIH w/2.5" temp tool (Temp @ perfs - 186 deg). POOH & test casing/tree w/CT. Good test
Receive sundry approval. RIH to perf BFF Stg 1 (8065-8075). Good run. POOH & JWL RDMO. Prep for DFIT in am.
Groom location. Fuel units. Expro continue rigging up.
HSE Events:None reported. IFO. Wind chill -19
Operational Details (06:00 - 06:00)
Finalize move to Theta. MIRU Yellowjacket wireline. AM calls.
24 hour Forecast:Pump DFIT on BFF Stg 1. Shut-in well w/crystal gauge. Frac to spot liner/tanks & begin loading sand. Finalize rig
up as much as possible
Wind Direction: SW
AM Temp: -3
Ops @ 06:00 hrs.: SLB frac & Lil Red en route. RU to pump small DFIT on Stage 1 & monitor w/crystal gauge. Groom roads & pads
from small blow last evening
Phase: 0
Wind Speed: 10
24 hour Summary:
Finalized movd to Theta pad. Expro 90% rigged up. CT spotted & 80% rigged up. YellowJacket WL AOL. RIH to
8170 with 2.75" GR, then 2.5" temp tool. POOH. Test casing & WH to 7500 with CT. Good test. RIH & perforate
8065'-8075'. Good shot-no change in WH PSI. YJ WL RDMO
Weather
Gen Conditions: Cloudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
4
Phone 1 3.10.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 16:00 10:00
16:00 20:00 4:00
20:00 6:00 24:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Grooming roads. Fueling units. Expro moving heaters in place. Moving from Company Man camp to Galena Camp Phase: 0
Wind Speed: 10
24 hour Summary:
Rigged up SLB pump float for pump-in/DFIT. Added crystal gauge near wellhead for standalone recording. Spotted
frac tanks on liner. Pumped 40 bbls 3% KCl for DFIT. Open well @ 47 psi. ISIP @ 1538 psi (0.63 FG). RD CT float
pump & shut in well with leg to gauge open.
Weather
Gen Conditions: Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO. Wind chill -19
Operational Details (06:00 - 06:00)
Rig up float pump next to CT for DFIT pump-in. SLB AOL to set tanks & liner.
24 hour Forecast:Finish frac rigup without iron (40%). Fill sand bins for BFF Stg 1. Discuss KCl water for frac with Swaco Wind Direction: SW
AM Temp: -3
Total Hours 38:00
Pumped DFIT. Added crystal gauge & shut-in well with leg open to gauge.
No activity
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
5
Phone 1 3.11.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: No activity Phase: 0
Wind Speed: 10
24 hour Summary:Moved from Talitha camp to Theta camp. Rigging down portion of Talitha camp. Multiple conference calls. SLB
finished available rigup & set tanks/liner/berms. Set KCl plan for tank loading
Weather
Gen Conditions: Mostly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO. Wind chill -36
Operational Details (06:00 - 06:00)
Move down from Talitha. SLB on location finalizing available rigup & setting tanks/berms. SLB off location.
24 hour Forecast:No activity planned. Frac rigged up to extent of iron. Expro rigged up. Tanks set - will fill with 4% KCl on 3/13/22.Wind Direction: NE
AM Temp: -16
Total Hours 24:00
No activity
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
6
Phone 1 3.12.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
No activity
HSE Events:None reported. IFO. Wind chill -36
Operational Details (06:00 - 06:00)
No activity
24 hour Forecast:SLB to move more units onto location Wind Direction: NE
AM Temp: -16
Ops @ 06:00 hrs.: No activity planned. Waiting on update from SLB regarding iron testing Phase: 0
Wind Speed: 10
24 hour Summary:Continue grooming location & rigging up for Frac Stage 1. Begin partial teardown of Talitha camp
Weather
Gen Conditions: Mostly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
7
Phone 1 3.13.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
No activity
HSE Events:None reported. IFO. Wind chill -47
Operational Details (06:00 - 06:00)
SLB brought units to location.
24 hour Forecast:SLB to spot remaining equipment. Begin loading KCl water into tanks in afternoon. Prep for frac on 3/14 Wind Direction: NE
AM Temp: -26
Ops @ 06:00 hrs.: No activity. Ops pending SLB update on iron certification Phase: 0
Wind Speed: 10
24 hour Summary:SLB brought 5 pumps to location & spot. Continue partial teardown @ Talitha.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
8
Phone 1 3.14.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: SLB began rigup @ 5:30 am. Fueling trucks & grooming roads Phase: 0
Wind Speed: 16
24 hour Summary:Talitha teardown complete. Only comms shack remains. SLB arrived with chemical units & diesel transport.
Spotted trucks & pumps. Begin hauling 4% KCl for frac stage 1.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO. Wind chill -30
Operational Details (06:00 - 06:00)
SLB brought chemical units to location & spotted trucks. Started hauling 4% KCl water.
24 hour Forecast:Finish frac rigup & top off frac water tanks. Remove gauge & rigup tree. Frac BFF Stage 1 Wind Direction: NE
AM Temp: -8
Total Hours 24:00
Minimal activity. SLB frac on site at camp. Continue hauling frac water overnight.
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
9
Phone 1 3.15.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 11:00 5:00
11:00 20:00 9:00
20:00 6:00 10:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
SLB finishd with main rigup. Only need to prime-up, PT & run chemical lines. Waiting on sundry approval.
Location shut down for remainder of evening
HSE Events:None reported. IFO. Wind chill -48
Operational Details (06:00 - 06:00)
SLB AOL with remaining equipment. Last loads of 4% KCl put into frac tanks.
24 hour Forecast:Frac BFF Stage 1. Upon successful completion of frac stage, will RIH with WL to perforate BFF Stage 2 (7745'-
7755'). Prep for Stage 2 Frac.
Wind Direction: NE
AM Temp: -22
Ops @ 06:00 hrs.: SLB off camp @ 6 am & starting trucks. Waiting on sundry approval. Once approved, will commence with prime-up
& PT. YJ Wireline on way to location. Lil Red in place.
Phase: 0
Wind Speed: 14
24 hour Summary:Took DFIT gauge out of line - no data. Backed up with CT data. SLB aol with remaining units & rigged up. Finished
loading frac water.
Weather
Gen Conditions: Mostly sunny
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
10
Phone 1 3.16.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 11:00 5:00
11:00 14:00 3:00
14:00 17:30 3:30
17:30 20:30 3:00
20:30 2:00 5:30
2:00 6:00 4:00
6:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Sundry notification provided. Prime up & PT SLB. Crews in place for Frac Stage 1.
PU/PT good. Have safety meeting. Begin mixing gel for BFF stage 1 frac
Start BFF frac stage 1, Open Well: 1156 psi, FET ISIP: 1311 psi, EOJ ISIP: 1603 psi; Severe NWB frictions; Job pumped well & to
completion
RIH w/YJ wireline; Encountered hard stop @ top of packer (7002'; 28' tool) w/plug & guns (2.5"); POOH & RBI w/ 1 11/16" tool/weight bar;
Run to bottom & back out; Tight spot near top of packer-Dragged on way in; Opt to run plug & guns on separate runs
Set plug @ 7900'; Ran free with just plug; Dropped ball to seal plug; Will test plug & perforate after positive plug test; Filling 4% KCl water
& unloading sand for stage 2
HSE Events:None reported. IFO. Wind chill -38
Operational Details (06:00 - 06:00)
SLB finished warming trucks & setting up FracCat; Only need PU/PT. Water loaded 100%. Prop loaded 100%. Waiting on sundry
notification @ 11 am
24 hour Forecast:PT Stage 2 plug & perforate; Frac BFF Stage 2, Set plug & perforate for stage 3 frac, Haul water, prop & chemicals
for Stage 3
Wind Direction: NE
AM Temp: -15
Ops @ 06:00 hrs.: Plug set & dropped plug ball; Final water & proppant for stage 2 on location Phase: 0
Wind Speed: 15
24 hour Summary:SLB frac fully rigged up; Lacking PU/PT, Yellowjacket WL spotted; Lil Red & Aux Frac Support in place, Received
sundry approval @ 2 pm; Proceeded with frac stage 1; Went well & to completion; RIH w/YJ WL to P&P BFF Stg 2
Weather
Gen Conditions: Cloudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
11
Phone 1 3.17.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 11:00
11:00 19:30 8:30
19:30 23:00 3:30
23:00 2:00 2:30
2:00 6:00 4:00
6:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: WL AOL. Finishing loading proppant & KCl water. Phase: 0
Wind Speed: 9
24 hour Summary:RIH w/Stage 2 perfs; Shot 7745-7755' successfully; POOH & begin frac rigup; Unloading proppant & filling frac
tanks; Frac stage 2 - no issues; RD frac & shut-in well
Weather
Gen Conditions: Mostly Sunny
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO. Wind chill -48
Operational Details (06:00 - 06:00)
Set plug @ 7900'; POOH. RIH w/perf guns to 7745-7755. Successful shoot for stage 2. POOH. Prep for frac stage 2.
24 hour Forecast:RIH w/Stage 3 perfs to shoot 7595-7605'; Finish loading frac water & proppant for stage 3. Rig up frac, test & Frac
BFF Stage 3.
Wind Direction: NE
AM Temp: -27
Total Hours 18:30
Finish loading frac water & proppant for stage 3. Begin prime-up & pressure test. Good test. Have pre-frac safety meeting.
Start BFF frac stage 2, Open Well: 1208 psi, FET ISIP: 1510 psi, EOJ ISIP: 1820 psi. Job pumped well & to completion
RD frac, clear area for WL & shut-in well
Fueling units, loading proppant & water for stage 3
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
12
Phone 1 3.18.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
41 30.3
P.B.T.D.:
From To Hrs.
6:00 9:00 3:00
9:00 11:30 2:30
11:30 18:00 6:30
18:00 22:30 4:30
22:30 1:00 2:30
1:00 6:00 5:00
6:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
YJ WL RIH with stage 3 plug & guns. Successfully shoot 7595-7605'. POOH. RDMO
SLB turning on units, prepping for BFF stage 3 frac. SLB to do chemical change - testing & approval internally needed. Change known
since 3/16/22 @ 16:00. Final approval received @ 18:00 on 3/17/22.
SLB finish rigging up for stage 3. PU/PT
Pump frac BFF Stage 3 treatment. Pumped well & to completion. 280k proppant pumped. Open Well: 1360 psi LD Hole ISIP: 1774 psi
FET ISIP: 1742 psi EOJ ISIP: 2024 psi
Rig frac off well & begin CT rig up
HSE Events:None reported. IFO. Wind chill -46
Operational Details (06:00 - 06:00)
Fueling units, receiving sand & filling up frac tanks w/4% KCl.
24 hour Forecast:Finish BOP test. Get on well with CT. RIH for 2 plug drillout. Drillout plugs & GTB. POOH w/CT, change to cement
nozzle, drop to 6500' & begin flowing well with N2.
Wind Direction: NE
AM Temp: -21
Ops @ 06:00 hrs.: SLB CT rigging up & readying for BOP test Phase: 0
Wind Speed: 15
24 hour Summary:
RIH for stage 3 perforating; Shoot successfully. POOH & RDMO YJ WL. Continue filling frac tanks & offloading
sand. Frac filling chemicals & readying to PU/PT. Delay due to SLB chemical change/approval. Received final
approval. Pumped BFF stage 3. Pumped well & to completion. Shut in well & rig up SLB CT. Prep for BOP test.
Weather
Gen Conditions: Cloudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/17/22 9:00 PM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
13
Phone 1 3.19.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
14 30.3
P.B.T.D.:
From To Hrs.
6:00 11:00 5:00
11:00 17:30 6:30
17:30 20:00 2:30
20:00 3:30 7:30
3:30 6:00 2:30
6:00 6:00 0:00
6:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/17/22 9:00 PM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Coil OOH & changing BHA. Halliburton N2 on way to location.Phase: 0
Wind Speed: 15
24 hour Summary:CT finish BOP test, rig up & get on well. RIH to TOL with 2.75" mill & motor. Mill out both frac plugs & push to
bottom; Issues milling 2nd plug & getting to bottom, Could not get past bottom perf @ 8074', POOH & pull BHA;
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO. Wind chill -51
Operational Details (06:00 - 06:00)
CT finishing rigging up & begin BOP test; Frac begin breaking iron loose; Empty trash fluid tank & haul off
24 hour Forecast:Set coil to depth of 6500' & open choke to Expro. Begin flow testing well with N2 @ 400 scf/min. Wind Direction: NE
AM Temp: -25
Total Hours 24:00
Frac rigging down & moving trucks; CT finish BOP test & get on well
Frac moving units off location; CT RIH to begin drillout
CT run down, tag plug 1, drillout, pull up, tag plug 2, drillout, pull up & mill down to 8074' (tagged everything at 17' high); Issues noted
entering liner & milling 2nd plug; Multiple tries to get through perfs; Motor stalling (hard) at bottom of perfs (8074')
CT POOH w/mill & motor;
CT getting off well to change BHA; Shift change
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
14
Phone 1 3.20.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
10 30.3
P.B.T.D.:
From To Hrs.
6:00 9:00 3:00
9:00 12:30 3:30
12:30 17:15 4:45
17:15 18:15 1:00
18:15 23:30 5:15
23:30 6:00 6:30
6:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Worley trucks moving flowback water; Continue flow test w/N2; SLB CT shift change Phase: 0
Wind Speed: 12
24 hour Summary:
CT coming out of hole to change BHA; Halliburton N2 on location; Repaired seal/leak on CT injector; RIH w/CT to
1000 ft & begin flow test; Start N2 lift & open choke; Well flowing @ 1220 psi; Continue CT depth changes, choke
changes & N2 rates to encourage flow
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO. Wind chill -47
Operational Details (06:00 - 06:00)
CT POOH; Off well to change drillout BHA to cement nozzle; HES N2 AOL; CT Lubricator froze up; Heavy leak from injector head
gearbox; Requested shutdown for mechanic review & repair
24 hour Forecast:Continue flowing well with N2; Hauling flowback; SLB frac to remove remaining frac units Wind Direction: NE
AM Temp: -24
Total Hours 24:00
SLB lube truck arrived to drain gearbox; Mechanic arrived to repair seal & repair injector head leak; Add dribble hose to minimize spill
impact
CT leak repaired; Injector head hoisted above well; CT on well; N2 cooling down & PT; CT pressure test
RIH w/CT; WH @ 1160 psi; Stop at 1000 ft; Begin N2 @ 400 scf/min
Flow testing well; Avg return 2200 bwpd; WH @ 1198 psi; Move CT end of tubing to 2000 ft
Continue flow testing well; CT @ 2000 ft; WH @ 1070 psi; Circ @ 1892 psi; N2 @ 400 scf/min
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
15
Phone 1 3.21.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
10 30.3
P.B.T.D.:
From To Hrs.
6:00 12:00 6:00
12:00 18:00 6:00
18:00 0:00 6:00
0:00 6:00 6:00
6:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Continue flow test; started cutting oil @ 16:30; CT @ 4500'; N2 @ 400 scf/min
Continue flow test; CT @ 5000'; N2 @ 500 scf/min
Continue flow test; CT @ 5500'; N2 @ 500 sc/min; Total fluid recovered: 3281 bbls
HSE Events:None reported. IFO. Wind chill -45
Operational Details (06:00 - 06:00)
Continue flow test; CT @ 2500'; N2 @ 400 scf/min
24 hour Forecast:Continue flow test; SLB frac to remove all equipment from location Wind Direction: NW
AM Temp: -28
Ops @ 06:00 hrs.: Flow testing Phase: 0
Wind Speed: 6
24 hour Summary:Continue flow test; SLB Frac removed frac tanks & auxiliary equipment
Weather
Gen Conditions: Mostly Clear
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Ray Miller 210-275-8895
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
17
Phone 1 3.23.22
Phone 2 Tool Pusher (N):
API No: PTD: Field:
8,450' ft
0ft
10 30.3
P.B.T.D.:
From To Hrs.
6:00 10:30 4:30
10:30 12:00 1:30
12:00 0:00 12:00
0:00 6:00 6:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Discontinue pumping N2, POH with coil, secure injector on deck, blow down Expro surface lines, Release Halliburton N2 unit.
Well shut in. blowing down securing equipment and personnel for high wind event predicted. Release LRS operator.
Well shut in.
HSE Events:None reported. IFO. Wind chill -37
Operational Details (06:00 - 06:00)
Continue flow test; CT @ 6,500' ; N2 @ 700 scf/min
24 hour Forecast:Continue shut in secure people and equipment for high wind weather event.Wind Direction: E
AM Temp: -15
Ops @ 06:00 hrs.: Well shut in.Phase: 0
Wind Speed: 15 t/ 20
24 hour Summary:
Continue flow test; Stop pumping N2, pull coil out of hole, set injector on SBL unit deck, release N2 unit, blow down
Expro, pull free produces water from uprights send out for disposal. Release LRS operator. Secure equipment and
personnel for coming weather event.
Weather
Gen Conditions: Mostly Clear
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Ray Miller/ Paul Smith 210-275-8895 / 907-5290737
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Carl Bowers 817-964-7371 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Schlumberger Well Type: Exploration
18
Phone 1 3.24.22
Phone 2 Tool Pusher (N): 24
API No: PTD: Field:
8,450' ft
0ft
19 30.3
P.B.T.D.:
From To Hrs.
6:00 6:00 24:00
0:00
0:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
HSE Events:None reported. IFO.Wind chill -41
Operational Details (06:00 - 06:00)
Well shut in. Secure equipment and personnel during high wind blowing snow event.
24 hour Forecast:Continue suspended operations, when weather allows, dig out location and clear roads to resume normal
operations.
Wind Direction: E
AM Temp: -14
Ops @ 06:00 hrs.: Well shut in, no outside operations due to high winds and blowing snow.Phase: 2 to 3
Wind Speed: 25 t/ 40
24 hour Summary:Well shut in. Secure equipment and personnel for high wind event.Weather
Gen Conditions: Mostly Clear
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
19
Phone 1 3.25.22
Phone 2 Tool Pusher (N): 24
API No: PTD: Field:
8,450' ft
0ft
20 30.3
P.B.T.D.:
From To Hrs.
6:00 6:00 24:00
0:00
0:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Well shut in,Phase: 0
Wind Speed: 20
24 hour Summary:Well shut in. Weather
Gen Conditions: Mostly Clear
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -21
Operational Details (06:00 - 06:00)
Well shut in. resupply equipment and camp wih fuel and water.
24 hour Forecast:Continue well shut in. Dig out location and clear roads to resume normal operations.Wind Direction: E
AM Temp: -8
Total Hours 24:00
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
20
Phone 1 3.26.22
Phone 2 Tool Pusher (N): 24
API No: PTD: Field:
8,450' ft
0ft
21 30.3
P.B.T.D.:
From To Hrs.
6:00 6:00 24:00
0:00
0:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:*LRS unit on location, operator on stand by Deadhorse. *SLB coil unit on location, 1 operator on location. *Expro on location operational.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
HSE Events:None reported. IFO.Wind chill -32
Operational Details (06:00 - 06:00)
Well shut in, monitor pressure build up.
24 hour Forecast:Continue well shut in for pressure build.Wind Direction: E
AM Temp: -8
Ops @ 06:00 hrs.: Well shut in. Monitor well head pressure.Phase: 1
Wind Speed: 15
24 hour Summary:Well shut in. Monitor pressure build up Clean pad of snow keep roads cleat of blowing snow.Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
21
Phone 1 3.27.22
Phone 2 Tool Pusher (N): 27
API No: PTD: Field:
8,450' ft
0ft
22 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last Lube Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Well shut in. Monitor well head pressure. Continue clear pad of blowing snow.Phase: 1
Wind Speed: 22
24 hour Summary:Well shut in. Monitor well head pressure build up. Keep pad and roads clear of blowing snow. Travel limites due to
blowing snow.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -25
Operational Details (06:00 - 06:00)
Well shut in, monitor pressure build up. Rigging down Wolverine camp prepare for transport. Send Theta West #1 0il and gas samples to
Anchorage.
24 hour Forecast:Continue well shut in for pressure build.Wind Direction: ENE
AM Temp: -2
Total Hours 24:00
Well shut in, monitor pressure build up. Continue clear pad of blowing snow.
Comments:*LRS unit on location, operator on stand by Deadhorse. *SLB coil unit on location, 1 operator on location. *Expro on location operational.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
22
Phone 1 3.28.22
Phone 2 Tool Pusher (N): 26
API No: PTD: Field:
8,450' ft
0ft
23 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:*LRS unit on location, operator on stand by Deadhorse. *SLB coil unit on location, 1 operator on location. *Expro on location operational.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Well shut in, monitor pressure build up. Continue clear pad of drifting snow. Travel limited due to drifting snow.
HSE Events:None reported. IFO.Wind chill -35
Operational Details (06:00 - 06:00)
Well shut in, monitor pressure build up. Continue clear pad of blowing snow. Lower Expro flare boom. LRS heat produced oil for transport
to Hilcorp sales.
24 hour Forecast:Continue well shut in for pressure build. Clear drifting snow due to high winds.Wind Direction: E
AM Temp: -21
Ops @ 06:00 hrs.: Well shut in. Monitor well head pressure. Continue clear pad of drifting snow.Phase: 2
Wind Speed: 21
24 hour Summary:Well shut in. Monitor well head pressure build up. Keep pad and roads clear of blowing snow. Travel limited due to
blowing snow.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
23
Phone 1 3.29.22
Phone 2 Tool Pusher (N): 26
API No: PTD: Field:
8,450' ft
0ft
24 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Well shut in. Monitor well head pressure. Continue clear pad of drifting snow.Phase: 2
Wind Speed: 23
24 hour Summary:Well shut in. Monitor well head pressure build up. Keep pad and roads clear of blowing snow. Travel limited due to
blowing snow.
Weather
Gen Conditions: Partly Cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -33
Operational Details (06:00 - 06:00)
Well shut in, monitor pressure build up. Continue clear pad of blowing snow.
24 hour Forecast:Continue well shut in for pressure build. Clear drifting snow due to high winds.Wind Direction: ENE
AM Temp: -8
Total Hours 24:00
Well shut in, monitor pressure build up. Continue clear pad of drifting snow. Travel limited due to drifting snow.
Comments:*LRS unit on location, operator on stand by Deadhorse. *SLB coil unit on location, 1 operator on location. *Expro on location operational.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
24
Phone 1 3.30.22
Phone 2 Tool Pusher (N): 26
API No: PTD: Field:
8,450' ft
0ft
25 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:*LRS unit on location, operator on location. *SLB coil unit on location, 1 operator on location. *Expro on location, operational.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Well shut in, monitor pressure build up. Continue clear pad of drifting snow. Travel limited due to drifted snow.
HSE Events:None reported. IFO.Wind chill -37
Operational Details (06:00 - 06:00)
Well shut in, monitor pressure build up. Continue clear pad of blowing snow. LRS heat produced oil to keep mobile for transport to Hilcorp
sales.
24 hour Forecast:Continue well shut in for pressure build. Clear drifting snow due to high winds.Wind Direction: ENE
AM Temp: -18
Ops @ 06:00 hrs.: Well shut in. Monitor well head pressure. Continue clear pad of drifting snow.Phase: 0
Wind Speed: 17
24 hour Summary:Well shut in. Monitor well head pressure build up. Keep pad and roads clear of blowing snow. Travel limited due to
blown snow.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
25
Phone 3.31.22
Phone Tool Pusher (N): 27
API No: PTD: Field:
8,450' ft
0ft
26 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Well shut in. Rigging down Expro spread 50%.Phase: 0
Wind Speed: 21
24 hour Summary:
Well shut in. Load and transport produced oil to Hilcorp sales. Begin rigging down tank farm, set out Wolverine
camp and prep for demobe/transport, digging out and warming up coil unit for operations, rigging down Expro test
spread. Continue clearing snow from roads and pad.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -46
Operational Details (06:00 - 06:00)
Well shut in. Take down tank farm stairs and landings. Load produced oil and transport to Hilcorp sales, Set out Wolverine camp units for
transport off location. Clear snow from pad.
24 hour Forecast:Set CIBP in 3 1/2" liner with Yellow Jacket E-line, RIH with coil, Fluid pack well, Pressure test plug / casing, tag
plug with AOGCC witness. Proceed with pumping cmt plug #1.
Wind Direction: ENE
AM Temp: -26
** AOGCC 48 hour witness requested for 4/1/22 22:00 for 3 1/2" liner CIBP tag and PT.
Total Hours 24:00
Well shut in. Schlumberger coil digging out and warm up to be operational for BOP test and well work. 100 bbl hot water on location to
thaw slop tank and assist Expro rig down, vacuum lines as they are taken loose. Continue clear pad of drifted snow.
Comments:*LRS unit on location, operator in Deadhorse. *SLB coil unit on location, crews arrive to clear snow warm up and make unit operational, *last day of 24 hr. coil
operations. *Expro on location, rigging down test spread. Yellow Jack E-line requested to arrive 3/31/22 AM. AOGCC 48 hour notice for witness requested.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
26
Phone 4.1.22
Phone Tool Pusher (N): 30
API No: PTD: Field:
8,450' ft
0ft
27 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:*LRS unit on location, operator in Deadhorse. *SLB coil unit on location, day and night crews on location. *Expro on location, rigging down test spread. Alaska E-line
unit in Deadhorse, operators to arrive from Kenai today and mobilize when weather allows.. AOGCC 48 hour notice for witness.
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
** AOGCC 48 hour witness requested for 4/1/22 22:00 for 3 1/2" liner CIBP tag and PT.
Total Hours 24:00
Well shut in. Schlumberger coil digging out and warm up to be operational for BOP test and well work. Expro rig down. Continue clear pad of
drifted snow.
HSE Events:None reported. IFO.Wind chill -41
Operational Details (06:00 - 06:00)
Well shut in. Demobe transport Wolverine camp units. Clear snow from pad and road.
24 hour Forecast:
When weather permits, Mobilize E-line unit and tools to location. Set CIBP in 3 1/2" liner with Yellow Jacket E-line, RIH
with coil, Fluid pack well, Pressure test plug / casing, tag plug with AOGCC witness. Proceed with pumping cmt plug
#1.
Wind Direction: ENE
AM Temp: -22
Ops @ 06:00 hrs.: Well shut in. Rigging down Expro spread 90%Phase: 2 to 3
Wind Speed: 26
24 hour Summary:Well shut in. Unable to procure and mobilize needed equipment due to high winds and blowing snow. Continue clearin
snow from roads and pad.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
27
Phone 4.2.22
Phone Tool Pusher (N): 30
API No: PTD: Field:
8,450' ft
0ft
28 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 3/19/22 5:15 PM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Well shut in. Rigging down Expro spread ready to demobe today. Cruz clearing road and pad.Phase: 0
Wind Speed: 13
24 hour Summary:Well shut in. Unable to procure and mobilize needed equipment due to high winds and blowing snow. Continue clearin
snow from roads and pad.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -34
Operational Details (06:00 - 06:00)
Well shut in. Clear snow from pad and road.
24 hour Forecast:When weather permits, Mobilize E-line unit and tools to location. Set CIBP in 3 1/2" liner with Alaska E-line, RIH with
coil, Fluid pack well, Pressure test plug / casing, tag plug with AOGCC witness. Proceed with pumping cmt plug #1.
Wind Direction: ENE
AM Temp: -18
Total Hours 24:00
Well shut in. Schlumberger coil digging out and warm up to be operational for BOP test and well work. Expro rig down. Continue clear pad of
drifted snow.
**Alaska E-line and slick line units with operators mobilizing from deadhorse as soon as roads are clear for travel to location.
** AOGCC 48 hour witness requested for 4/1/22 22:00, updated AOGCC inspector 4/1/22.
*LRS unit on location, operator in Deadhorse. *SLB coil unit on location, day and night crews on location. *Expro on location, rigging down test
spread, ready to begin transport. AOGCC 48 hour notice for witness.
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
29
Phone 4.4.22
Phone Tool Pusher (N): 30
API No: PTD: Field:
8,450' ft
0ft
30 30.3
P.B.T.D.:
From To Hrs.
6:00 20:30 14:30
20:30 23:00 2:30
23:00 0:00 1:00
Midnight 1:00 1:00
1:00 2:00 1:00
2:00 3:30 1:30
3:30 5:00 1:30
5:00 6:00 1:00
0:00
0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Pumping diesel to freeze protect coil and well at 1,500'Phase: 0
Wind Speed: 17
24 hour Summary:
Test coil BOPE, Fluid pack coil with diesel, test coil BOPE, RIH with coil to CIBP, fluid pack well, test casing and CIBP
(AOGCC witnessed), tag CIBP, (AOGCC witnessed), rig up Schlumberger cement and lay in 1st cement plug, pull up
and lay in 2nd cement plug. pull to 1,500 and freeze protect.
Weather
Gen Conditions: Overcast
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -45
Operational Details (06:00 - 06:00)
Lay over coil mast "T" bar, pick up coil BOPE, set on well, remove flange, install test flange, set back on deck for BOP test. Test coil BOPE
per Schlumberger procedure..
24 hour Forecast:Blow down and rig down coil unit, WOC, RIH with Pollard slick line with cement bailer to tag cement plug @ 3,064'
(AOGCC to witness tag), pressure test cement (AOGCC to witness test), rig up Alaska Eline for 5 1/2' tubing punch.
Wind Direction: W
AM Temp: -20
Continue circ and pull coil nozzle to 1,500', pump 77 bbl. diesel freeze protect coil and well to 1,500'.
*Expro 95% demobe, transported off location. Tank farm transported off location, 2 people to operate Expro choke for bleed off.
* AOGCC 48 hour witness for tag and pressure test 2nd plug requested for 4/3/22 06:00.
*LRS unit and operator on location. *SLB coil unit with day and night crews on location.
Total Hours 24:00
RIH with coil cmt nozzle. Tag CIBP @ 7,537 *Coil measure. (7,545 WLM.) AOGCC tag witness by Lou Laubenstein.
Pump 10 bbl hot diesel to warn interface diesel to brine. Pump 45 bbl warm fluid to warm coil.
Pressure up 5 1/2" casing against CIBP with coil unit to 3,300 psi for 30 minutes, final pressure 3,123 psi. Good test per AOGCC witness Lou
Laubenstein.
Continue circ. To displace well to #9.4 brine with coil unit. Rig up Schlumberger cement unit. During circulations returned 32.2 bbl crude from
well.
Set cement plug #1: with cement nozzle @ 7,532' pump and lay in with coil, 8 bbl #15.8 cement @.5 bpm to per well plan, CIP @ 03:05 AM.
Calculated TOC @ 6,883, Continue circ while pull up coil to 3,264'
Set cement plug #2: With coil nozzle @ 3,264' pump and displace 5 bbl. #15.8 cement @ .5 bpm with coil to 3,064' per well plan. CIP 05:00.
Calculated TOC @ 3,064'
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
30
Phone 4.5.22
Phone Tool Pusher (N): 30
API No: PTD: Field:
8,450' ft
0ft
31 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 24:00 PM 6:00
24:00 PM 2:00 2:00
2:00 6:00 4:00
0:00
0:00 0:00
0:00 0:00
0:00
0:00
0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Resting Pollard slick line personnel.Phase:
Wind Speed:
24 hour Summary:Wait on cement, Spot Pollard equipment.
Weather
Gen Conditions:
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill
Operational Details (06:00 - 06:00)
Waiting on cement. Rigging down coil unit, blow down coil with N2 for transport.
24 hour Forecast:
WOC, Rest crews, RIH with Pollard slick line with cement bailer to tag cement plug @ 3,064' (AOGCC to witness tag),
pressure test cement (AOGCC to witness test), rig up Alaska Eline for 5 1/2' tubing punch. Cirrculate for surface
cement plug.
Wind Direction:
AM Temp:
*Expro 95% demobe, transported off location. 2 people to operate Expro choke for bleed off.
*AOGCC 48 hour witness for tag and pressure test plug notice given 3//30/22.
*LRS unit and operator on location. *SLB coil unit with day and night crews on location, rigging down.
Total Hours 24:00
Waiting on cement. Rigging down coil, Set back BOPs lay mast over. Vac surface lines, ready unit for transport.
Waiting on cement. Pollard travel to location, timed out with travel from Kenai, spot eqiupment.
Rest crews.
**Gave AOGCC Lou Laubenstein update email at 02:00 for tag cement and pressure test witness at Noon 4/5/22.
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
31
Phone 4.6.22
Phone Tool Pusher (N): 30
API No: PTD: Field:
8,450' ft
0ft
32 30.3
P.B.T.D.:
From To Hrs.
6:00 8:00 2:00
8:00 14:00 6:00
14:00 15:00 1:00
15:00 17:00 2:00
17:00 24:00 7:00
Midnight 6:00 6:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
*Expro 95% demobe, transported off location. 3 people to operate Expro choke for circulation.
*LRS unit and operator on location. * SLB coil unti off location 18:00 4/5/22
Total Hours 24:00
Install wellhead adapter and flange, rig up slick line lubricator, RIH with bailer, tag TOC @ 3,004'. POH, clean and re-run bailer to 3,004'
confirm hard cement Tag and cement witnessed by AOGCC inspector Lou Laubenstein.
Pressure test 5 1/2" casing and plug to 3,000 psi for 30 min, good test, PT witnessed by AOGCC inspector Lou Laubenstein.
Rig down Pollard slick line unit, Unit left location for another job.
Wait on E-line unit to perforate 5 1/2" casing for final cement job.
Wait on E-line unit to perforate 5 1/2" casing for final cement job.
HSE Events:None reported. IFO.Wind chill -31
Operational Details (06:00 - 06:00)
Rest Pollard wire line crews.
24 hour Forecast:Rig up E-line perforate at 200' establish circulation, remove frac tree, install 5 K valve, rig up and cement @ surface.Wind Direction: NE
AM Temp: -18
Ops @ 06:00 hrs.: Waiting on E-line unit.Phase: 0
Wind Speed: 10
24 hour Summary:Rest crews, run bailer and tag cement, PT 5 1/2" and cement plug, witnesses by AOGCC, rig down slick line, wait on
E-line unit.
Weather
Gen Conditions: Partly Couudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
28
Phone 4.3.22
Phone Tool Pusher (N): 30
API No: PTD: Field:
8,450' ft
0ft
29 30.3
P.B.T.D.:
From To Hrs.
6:00 12:00 6:00
12:00 5:00 5:00
5:00 7:30 2:30
7:30 8:30 1:00
8:30 9:30 1:00
9:30 2:00 4:30
2:00 4:00 2:00
4:00 6:00 2:00
0:00
0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Rigging up to test coil BOPE.Phase: 0
Wind Speed: 13
24 hour Summary:
Clear road and pad for operations, Mobilize Alaska E-line from Dead Horse, Run gauge ring with Pollard SL, swap to
Alaska E-line, run pressure log for BHP. POH, run and set CIBP @ 7,545' POH rig down and off well, begin process of
testing coil BOPs.
Weather
Gen Conditions: Mostly cloudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -34
Operational Details (06:00 - 06:00)
Clear road and pad of blown snow, mobilize and transport Alaska E-line units and personnel from Dead Horse. Set coil BOPs on coil deck.
24 hour Forecast:
Fluid pack coil with diesel, test coil BOPE, RIH with coil to CIBP, fluid pack well, test casing and CIBP (AOGCC
witness), tag CIBP, (AOGCC witness), rig up Schlumberger cement and lay in 1st cement plug, pull up and lay in 2nd
cement plug.
Wind Direction: ENE
AM Temp: -13
POH with set tool, rig E-line off well.
*Expro 90% demobe, transported off location. Tank farm transported off location, 2 people to operate Expro choke for bleed off.
Total Hours 24:00
Spot Alaska E-line and Pollard slick line units. Rig up Pollard Slick line.
Test lub with LRS, RIH with 2.76" gauge ring on slick line, work gage ring 1,400' to 1,500' (ice), RIH to 8,016' WLM, hard set down. POH.
Tools were iced up, lay dn slick line tools.
Rig down Pollard slick line, swap units, Rig up Alaska E-line.
* AOGCC 48 hour witness requested for 4/1/22 22:00, update AOGCC inspector 4/3/22.
*LRS unit and operator on location. *SLB coil unit with day and night crews on location.
Make up "Legacy" 2.75" OD "Big Boy" CIBP, RIH, correlate and set @ 7,545', pick up and run back to tag, good tag, on depth.
Pick up and make up E-line lub, LRS pumped 21.5 bbl 1 bpm diesel into well to thaw @ 150 deg. Icp = 600 psi FCP= 870 psi.
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
RIH with down hole pressure gauge / temp gauges / CCL / Gamma. Fluid level erratic 1,100' to 1,486, below observed normal gradient, good
fluid, set down @ 8,056' WLM, set 20 min to record BHP. Observed BHP of 3,895.2 psi with 780 psi well head pressure. POH.
32
Phone 4.7.22
Phone Tool Pusher (N): 30
API No: PTD: Field:
8,450' ft
0ft
33 30.3
P.B.T.D.:
From To Hrs.
6:00 18:00 12:00
18:00 6:00 12:00
0:00
0:00 0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Waiting on Alaska E-line unit and crews Phase: 0
Wind Speed: 15
24 hour Summary:No activity waiting on E-line
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -25
Operational Details (06:00 - 06:00)
Wait on E-line unit to perforate 5 1/2" casing for final cement job. Removed fluids from "slop tank" for disposal.
24 hour Forecast:Rig up E-line, perforate @ 200', confirm circulation, remove frac tree, install valve, rig up and cement 5 1/2" and 5
1/2" X 9 5/8" annuus.
Wind Direction: ESE
AM Temp: -5
*Expro 95% demobe, transported off location. 3 people to operate Expro choke for circulation.
*LRS unit and operator on location. * SLB coil unit off location 18:00 4/5/22
Total Hours 24:00
Wait on E-line unit to perforate 5 1/2" casing for final cement job.
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
33
Phone 4.8.22
Phone Tool Pusher (N): 22
API No: PTD: Field:
8,450' ft
0ft
34 30.3
P.B.T.D.:
From To Hrs.
6:00 8:00 2:00
8:00 13:30 5:30
13:30 19:00 5:30
19:00 22:00 3:00
22:00 22:30 0:30
22:30 24:00 1:30
Midnight 6:00 6:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: WOC Phase: 0
Wind Speed: 13
24 hour Summary:Wait on E-line unit, perforate 5 1/2" casing, establish communication to 9 5/8" casing. Perform surface plug cement
job. Wait on cement to cure for test.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -21
Operational Details (06:00 - 06:00)
Wait on E-line unit to perforate 5 1/2" casing for final surface cement job (plug # 3).
24 hour Forecast:Pressure test tubing and annulus to 2,000 psi, Excavate cellar, Begin removing well head for abandonment
Wind Direction: ENE
AM Temp: -6
* Schlumberger bulk truck off location, pump truck left on location.
*Expro 100% rigged down, ready for transport off location. 3 people per shift.
*LRS unit and operator on location. * SLB coil unit off location 18:00 4/5/22
Total Hours 24:00
Rig up Alaska E-line, pick up lub, Observed 29 psi annulus 26 psi on tubing. RIH with guns, Shoot holes @ 208'. Establish communication
to annulus. (Pressure equalized @ 26 psi.) Pressure up to 90 psi on annulus, tubing pressure increased to 90 psi.
Remove Expro flow lines, bleed well to 0 psi, Nipple down frac tree, nipple up adapters to 2" 1502 for pumping cement.
Spot and rig up Schlumberger cement unit. Spot and retard vac trucks.
Pump 15 bbl. #15.7 Aricticset cmt down 5 1/2" taking returns from 5 1/2" X 9 5/8" annulus, observed #15.7 cement returns, Stop pumping.
Observed annulus on slight vac, shut in well. CIP 22:20.
WOC. Clean flush surface lines and clean cellar.
WOC. Thaw and clean in cellar, finish rigging down Expro equipment for transport.
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
34
Phone 4.9.22
Phone Tool Pusher (N): 22
API No: PTD: Field:
8,450' ft
0ft
35 30.3
P.B.T.D.:
From To Hrs.
6:00 13:30 7:30
13:30 15:00 1:30
15:00 1:30 10:30
1:30 6:00 4:30
0:00 0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
* transport Expro equipment off site.
* Schlumberger bulk truck off location, pump truck left on location.
*Expro 100% rigged down, off location. 3 people per shift.
*LRS unit and operator on location.
Total Hours 24:00
Pressure test well. Tie into annulus with LRS with gauge on tubing. Pressure up to 1,050 psi, tubing pressure increased to 1,050. Pressure
up to 1,200 psi, pressure bled to 800 psi in 30 min. no test.
Blend and test cement for surface plug. Remove scaffolding from cellar. Transport Expro equipment off location.
Schlumberger cement tests complete, travel to location.
HSE Events:None reported. IFO.Wind chill -19
Operational Details (06:00 - 06:00)
Wait on cement to cure.
24 hour Forecast:Pressure test tubing and annulus to 2,000 psi, Excavate cellar, Begin removing well head for abandonment Wind Direction: W
AM Temp: 0
Ops @ 06:00 hrs.: WOC Phase: 0
Wind Speed: 24
24 hour Summary:Wait on cement to cure for test.
Weather
Gen Conditions: Fair
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
35
Phone 4.10.22
Phone Tool Pusher (N): 0
API No: PTD: Field:
8,450' ft
0ft
36 30.3
P.B.T.D.:
From To Hrs.
6:00 8:00 2:00
8:00 8:30 0:30
8:30 12:00 3:30
12:00 6:00 18:00
0:00
0:00 0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Waiting for cement to cure Phase: 0
Wind Speed: 14
24 hour Summary:Cement surface plug, clean up
Weather
Gen Conditions: Coudy
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill -13
Operational Details (06:00 - 06:00)
Rig up Schlumberger unit to cement, retard clean up truck.
24 hour Forecast:Pressure test tubing and annulus to 2,000 psi, Excavate cellar, Begin removing well head for abandonment
Wind Direction: ESE
AM Temp: 0
* 100% Expro equipment transport off site.
* Schlumberger equipment off location
*LRS unit and operator on location for surface pressure test
Total Hours 24:00
Pump 15 bbls #15.7 Aricticset cement down 5 1/2" , good cement returnes. Plug 3.2 CIP 08:30
Clean up cement unit, pump cellar.
Wait for cement to cure. Excavate cellar, remove matting boards and material around cellar. Rig down and move Wolverine camp.
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
36
Phone 4.11.22
Phone Tool Pusher (N): 0
API No: PTD: Field:
8,450' ft
0ft
37 30.3
P.B.T.D.:
From To Hrs.
6:00 8:00 2:00
8:00 10:00 2:00
10:00 6:00 20:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Mobilize equipment for surface plug #3 Phase: 0
Wind Speed: 8
24 hour Summary:WOC, pressure test surface plugs, No Test, mobilize equipment for surface plug cement, Weather
Gen Conditions: Light Snow
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill 0
Operational Details (06:00 - 06:00)
Wait for cement sample to cure.
24 hour Forecast:Displace diesel freeze protect with water. Pump cement plug #3, WOC, Test surface plugs, Begin removing well
head for abandonment,
Wind Direction: SW
AM Temp: 11
Total Hours 24:00
Pressure test tubing and annulus to 1,000 psi with LRS unit tubing pressiure came up with annulus pressure. Bled to 600 psi in 30 min, No
Test.
Discuss options, mobilize equipment, lab test cement for surface plug #3.3
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
37
Phone 4.12.22
Phone Tool Pusher (N): 0
API No: PTD: Field:
8,450' ft
0ft
38 30.3
P.B.T.D.:
From To Hrs.
6:00 8:00 2:00
8:00 11:00 3:00
11:00 12:00 1:00
12:00 14:00 2:00
14:00 6:00 16:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Displace diesel freeze protect with water to prevent cement contamination of cement. Pumping down 5 1/2" returning 9 5/8" annulus, 15
bbl 80 deg water stopping for 15 min for diesel to migrate, pumped a total of 105 bbls displacing diesel. Well balanced with water
Pump 15 bbl 15.7 Aricticset cement down 5 1/2" returning from 9 5/8" annulus, good cement returns during pump job. Shut down well
static, in 15 min well on slight vac, after 15 well on very slight vac @ 5 1/2". *CIP 11:20 AM.
Clean cellar of cement and diesel, wash up and rig down cement unit.
Wait for cement to cure and set for pressure test.
HSE Events:None reported. IFO.Wind chill -6
Operational Details (06:00 - 06:00)
Mobilize equipment for surface cement plug #3.3
24 hour Forecast:WOC, pressure test surface plugs. Cut off wellhead.Wind Direction: WNW
AM Temp: 5
Ops @ 06:00 hrs.: WOC, Phase: 0
Wind Speed: 6
24 hour Summary:Mobilize equipment for surface cement plug, displace diesel freeze protect, pump cement plug #3.3, WOC Weather
Gen Conditions: Mostly cloudy
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
38
Phone 4.13.22
Phone Tool Pusher (N): 0
API No: PTD: Field:
8,450' ft
0ft
39 30.3
P.B.T.D.:
From To Hrs.
6:00 8:00 2:00
8:00 6:00 22:00
0:00
0:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Total Length (ft): 0.00
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Total Hours 24:00
Cement samples still soft, continue waiting for cement to cure.
*Load out Galena camp complete,
*Cleaning location, load misc. tools and equipment, load out well head tools and equipment
HSE Events:None reported. IFO.Wind chill
Operational Details (06:00 - 06:00)
WOC, mobilize personnel for pressure test.
24 hour Forecast:Wait for cement to cure, Test casing and annulus to 2,000 psi, cut off wellhead, continue with P & A operation Wind Direction:
AM Temp:
Ops @ 06:00 hrs.: WOC, Phase:
Wind Speed:
24 hour Summary:WOC, Weather
Gen Conditions:
Shoe Test: N/A 14.1 ppg EMW na
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Supervisor (N): Paul Smith 907-529 0737 NA
Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
39
Phone 4.14.22
Phone Tool Pusher (N): 0
API No: PTD: Field:
8,450' ft
0ft
40 30.3
P.B.T.D.:
From To Hrs.
0:00 9:00 9
9:00 10:00 1
10:00 11:00 1
11:00 22:30 11.5
22:30 24:00 1.5
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %
Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N):NA Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Perform DDTs, mobilize equipment for wellhead cut off Phase:
Wind Speed:
24 hour Summary:Wait on cement , rig up little red hot oil, MIT cement in IA and tbg as to P&A procedures Weather
Gen Conditions:
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill
Operational Details (06:00 - 06:00)
wait on cement
24 hour Forecast:Well head cut off, top off cement final inspection with AOGCC
Wind Direction:
AM Temp:
Total Hours 24
clear well head and IA valves of dried cement
Rig up LRS
MIT TBG and IA test good, Bled down pressure, rigged down little red
Days work
continue to demob equipment durning test time
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
41
Phone 4.15.22
Phone Tool Pusher (N): 0
API No: PTD: Field:
8,450' ft
0ft
40 30.3
P.B.T.D.:
From To Hrs.
0:00 24:00 6:00 6
24:00 6:00 14:00 8
14:00 16;00 2
16:00 17:00 1
16:00 17:00 0:00 7
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N):NA Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Move out co-man office Phase: 1
Wind Speed: 15/20
24 hour Summary:dig out Ice roads.dig out Theta Pad, Dig out well cellar, top fill 5-1/2, notifie state Weather
Gen Conditions: Blowing snow
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill n/a
Operational Details (06:00 - 06:00)
wait on weather
24 hour Forecast:AOGCC inspection, weld on name plate, pull cellar box
Wind Direction: NE
AM Temp: -3
Total Hours 24
Digout and open roads and pads
digout sniow from cellar box
Top fill 5-1/2
rig up wait on cement
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
42
Phone 4.16.22
Phone Tool Pusher (N): 0
API No: PTD: Field:
8,450' ft
0ft
40 30.3
P.B.T.D.:
From To Hrs.
0:00 24:00 24
24:00
0:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D): Jerry Otto 907-252 5297 Tool Pusher (D): NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor: Well Type: Exploration
Supervisor (N):NA Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md: Budget Amount: Actual Days since Start: RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress: Cum. Cost: Stg 1 Perf Date: 3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size: 28" 12-1/4" 8-1/2" 8-1/2" Last Pressure Test: 4/4/22 12:00 AM
OD/Weight 20"/ 129# 9-5/8" / 40# 5-1/2" / 17# 3-1/2"/ 9.2# Last Safety Mtg:
Casing: Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth: 75' 3,030' 8,376' 8,277' Last Evac Drill: NA
Plan Depth: 75' 3,500' 8,440' 8,376' Last Rig Insp.:
Ops @ 06:00 hrs.: Plow open ice road Phase: 1
Wind Speed: 15/20
24 hour Summary:Weather hold Due too high winds (35/45mph) and drifting snow Weather
Gen Conditions: Blowing snow
Shoe Test: N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill n/a
Operational Details (06:00 - 06:00)
Wait on weather drifting snows winds to 45mph
24 hour Forecast:pPlow open ice road,Top fill 5-1/2 Tbg, inspection with AOGCC
Wind Direction: NE
AM Temp: -3
Total Hours 24
Comments:
Bit Performance
Bit Type: Ser # Avg ROP IADC Dull Condition
Background (Avg) % 0
Connection % 0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas % 0 Volume Delivered: 0
Pump Data Slow Pump Rates
Total Length (ft): 0.00
43
Phone 4.17.22
Phone Tool Pusher (N): 0
API No: PTD: Field:
8,450' ft
0ft
40 30.3
P.B.T.D.:
From To Hrs.
0:00 6:00 6
6:00 15:00 9
15:00 18:00 3
18:00 24:00 6
24:00
0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0:00 0:00
0
Bit # Size Depth Depth Feet Bit hrs. K-revs Avg. Nozzles TFA
[in] In Out Drilled Run rpm sq in
Time Depth MW PV YP Mud Gas Readings:Used
Rig:
Total:
Pump Type Liner Sz SPM Eff %Flow SPP Pump Depth SPM SPP
MD TVD Inc.OD ID Conn. Length
Report #:
Supervisor (D):Jerry Otto 907-252 5297 Tool Pusher (D):NA Report Date:
Daily Completion Report
Well Name:THETA WEST #1 Rig/Contractor:Well Type:Exploration
Supervisor (N):NA Camp POB: on
location
50-223-20036-00-00 221-106 South Prudhoe Bay Lease no:
KB-GL, ft
Prog FTD md:Budget Amount: Actual Days since Start:RKB, ft
TD @ 06:00 Daily Cost: Planned Days (Perf to Test): GL, ft
Progress:Cum. Cost: Stg 1 Perf Date:3/8/2022
Project Number:RKB-CSG Flg, ft
Hole Size:28"12-1/4"8-1/2"8-1/2"Last Pressure Test:4/4/22 12:00 AM
OD/Weight 20"/ 129#9-5/8" / 40#5-1/2" / 17#3-1/2"/ 9.2#Last Safety Mtg:
Casing:Conductor Surface Intermediate Liner Last BOP Drill:
NA
Actual Depth:75'3,030'8,376'8,277'Last Evac Drill:NA
Plan Depth:75'3,500'8,440'8,376'Last Rig Insp.:
Ops @ 06:00 hrs.: pull cellar Phase:
Wind Speed:10-May
24 hour Summary:wait on cement, final inspection of Theta west #1with AOGCC, weld on marker plate Weather
Gen Conditions:Blowing snow
Shoe Test:N/A 14.1 ppg EMW na
HSE Events:None reported. IFO.Wind chill n/a
Operational Details (06:00 - 06:00)
Days work, waiting on cement
24 hour Forecast:complete dwmob Wind Direction:NE
AM Temp:-7
Total Hours 24
open roads with snow blower. Demob Schumberger transport
Final inspection with AOGCC, weld on marker plate
Days work,
Comments:
Bit Performance
Bit Type:Ser #Avg ROP IADC Dull Condition
Background (Avg) %0
Connection %0
Mud Properties Gas Details Fuel
Vis 0 Available
Model
Surveys BHA
AZ.Item Comment
Trip Gas %0 Volume Delivered:0
Pump Data Slow Pump Rates
Total Length (ft):0.00
SECTION 4.
Directional Survey
SECTION 4a.
Directional Survey
SLB Final Survey NAD27
7K
H
W
D
:
H
V
W
6
X
U
Y
H
\
*
H
R
G
H
W
L
F
5
H
S
R
U
W
1
$
'
'
H
I
6
X
U
Y
H
\
&R
P
P
H
Q
W
V
0'
IW
,Q
F
O
$]
L
P
7
U
X
H
79
'
6
6
IW
79
'
IW
96(
&
IW
$+
'
IW
&O
R
V
X
U
H
IW
16
IW
(:IW
'/
6
I
W
1R
U
W
K
L
Q
J
IW
8
6
(D
V
W
L
Q
J
IW
8
6
/D
W
L
W
X
G
H
/R
Q
J
L
W
X
G
H
57
(
1
$
9-
5
/
8
"
C
s
g
30
3
0
.
0
0
0.
3
6
2
2
3
.
2
5
2
7
8
9
.
9
2
3
0
2
9
.
9
2
2
.
8
4
1
9
.
6
3
1
6
.
6
5
2
.
8
4
-
1
6
.
4
0
0.
2
6
5
8
1
7
6
4
0
.
4
4
5
6
9
8
4
4
.
7
6
6
9
.
9
1
2
1
1
4
9
4
-
1
4
9
.
4
4
4
8
0
6
3
5
7R
W
D
O
*
U
D
Y
L
W
\
)
L
H
O
G
6
W
U
H
Q
J
W
K
P
J
Q
%
D
V
H
G
7R
W
D
O
&
R
U
U
0
D
J
1
R
U
W
K
!
7
U
X
H
1
R
U
W
K
*U
D
Y
L
W
\
0
R
G
H
O
Q
7
'2
;
7R
W
D
O
0
D
J
Q
H
W
L
F
)
L
H
O
G
6
W
U
H
Q
J
W
K
0D
J
Q
H
W
L
F
'
L
S
$
Q
J
O
H
1R
U
W
K
5
H
I
H
U
H
Q
F
H
)H
E
U
X
D
U
\
%*
*
0
7U
X
H
1
R
U
W
K
*U
L
G
&
R
Q
Y
H
U
J
H
Q
F
H
8
V
H
G
I
W
D
E
R
Y
H
0
6
/
79
'
5
H
I
H
U
H
Q
F
H
(
O
H
Y
D
W
L
R
Q
*U
R
X
Q
G
(
O
H
Y
D
W
L
R
Q
I
W
D
E
R
Y
H
0
6
/
)L
H
O
G
5H
S
R
U
W
'
D
W
H
16
6
R
X
W
K
(
[
S
O
R
U
D
W
L
R
Q
&O
L
H
Q
W
*U
H
D
W
%
H
D
U
)H
E
U
X
D
U
\
3
0
0L
Q
L
P
X
P
&
X
U
Y
D
W
X
U
H
/
X
E
L
Q
V
N
L
7
U
X
H
1
R
U
W
K
I
W
I
W
5R
W
D
U
\
7
D
E
O
H
6X
U
Y
H
\
'
/
6
&
R
P
S
X
W
D
W
L
R
Q
79
'
5
H
I
H
U
H
Q
F
H
'
D
W
X
P
9H
U
W
L
F
D
O
6
H
F
W
L
R
Q
$
]
L
P
X
W
K
9H
U
W
L
F
D
O
6
H
F
W
L
R
Q
2
U
L
J
L
Q
$3
,
7K
H
W
D
:
H
V
W
6W
U
X
F
W
X
U
H
6
O
R
W
:H
O
O
%R
U
H
K
R
O
H
7K
H
W
D
:
H
V
W
7K
H
W
D
:
H
V
W
7
:
/R
F
D
W
L
R
Q
*
U
L
G
1
(
<
;
1$
'
$
O
D
V
N
D
6
W
D
W
H
3
O
D
Q
H
=
R
Q
H
8
6
)
H
H
W
I
W
&R
R
U
G
L
Q
D
W
H
5
H
I
H
U
H
Q
F
H
6
\
V
W
H
P
6X
U
Y
H
\
1
D
P
H
7K
H
W
D
:
H
V
W
6X
U
Y
H
\
'
D
W
H
*U
L
G
6
F
D
O
H
)
D
F
W
R
U
9H
U
V
L
R
Q
3
D
W
F
K
:H
O
O
+
H
D
G
/R
F
D
O
&
R
R
U
G
5
H
I
H
U
H
Q
F
H
G
7
R
0D
J
Q
H
W
L
F
'
H
F
O
L
Q
D
W
L
R
Q
'H
F
O
L
Q
D
W
L
R
Q
'
D
W
H
0D
J
Q
H
W
L
F
'
H
F
O
L
Q
D
W
L
R
Q
0
R
G
H
O
1
:
7R
U
W
$
+
'
'
'
,
(
5
'
5
D
W
L
R
&5
6
*
U
L
G
&
R
Q
Y
H
U
J
H
Q
F
H
$
Q
J
O
H
)H
E
U
X
D
U
\
/R
F
D
W
L
R
Q
/
D
W
/
R
Q
J
1
I
W
8
6
(
I
W
8
6
'U
L
O
O
L
Q
J
2
I
I
L
F
H
1
6
6
R
X
W
K
(
[
S
O
R
U
D
W
L
R
Q
?
7
K
H
W
D
:
H
V
W
?
7
K
HW
D
:
H
V
W
?
7
K
H
W
D
:
H
V
W
?
7
K
H
W
D
:
H
V
W
3
0
3
D
J
H
RI
&R
P
P
H
Q
W
V
0'
IW
,Q
F
O
$]
L
P
7
U
X
H
79
'
6
6
IW
79
'
IW
96(
&
IW
$+
'
IW
&O
R
V
X
U
H
IW
16
IW
(:IW
'/
6
I
W
1R
U
W
K
L
Q
J
IW
8
6
(D
V
W
L
Q
J
IW
8
6
/D
W
L
W
X
G
H
/R
Q
J
L
W
X
G
H
3D
U
W
0'
)
U
R
P
IW
0'
7
R
IW
(2
8
)
U
H
T
IW
+R
O
H
6
L
]
H
LQ
&D
V
L
Q
J
'
L
D
P
H
W
H
U
LQ
$FW
6
W
Q
V
$FW
6
W
Q
V
$FW
6
W
Q
V
$FW
6
W
Q
V
6X
U
I
D
F
H
)
6
/
)
(
/
6
7
1
5
(
8
0
%+
/
)
6
/
)
(
/
7
1
5
(
8
0
6/
%
B
%
/
,
1
'
7
5
(
1
'
7
K
H
W
D
:
H
V
W
7
K
H
W
D
:
H
V
W
/H
J
D
O
'
H
V
F
U
L
S
W
L
R
Q
1R
U
W
K
L
Q
J
<
(
D
V
W
L
Q
J
;
6/
%
B
0
:
'
6
7
'
7
K
H
W
D
:
H
V
W
7
K
H
W
D
:
H
V
W
6/
%
B
0
:
'
6
7
'
7
K
H
W
D
:
H
V
W
7
K
H
W
D
:
H
V
W
6/
%
B
0
:
'
,
1
&
B
2
1
/
<
7
K
H
W
D
:
H
V
W
7
K
H
W
D
:
H
V
W
'H
V
F
U
L
S
W
L
R
Q
6X
U
Y
H
\
7
R
R
O
7
\
S
H
%
R
U
H
K
R
O
H
6
X
U
Y
H
\
6X
U
Y
H
\
(
U
U
R
U
0
R
G
H
O
,6
&
:
6
$
5
H
Y
'
&
R
Q
I
L
G
H
Q
F
H
V
L
J
P
D
6X
U
Y
H
\
3
U
R
J
U
D
P
'U
L
O
O
L
Q
J
2
I
I
L
F
H
1
6
6
R
X
W
K
(
[
S
O
R
U
D
W
L
R
Q
?
7
K
H
W
D
:
H
V
W
?
7
K
HW
D
:
H
V
W
?
7
K
H
W
D
:
H
V
W
?
7
K
H
W
D
:
H
V
W
3
0
3
D
J
H
RI
Fi
n
a
l
D
e
f
i
n
i
t
i
v
e
S
u
r
v
e
y
V
e
r
i
f
i
e
d
a
n
d
S
i
g
n
e
d
-
o
f
f
Ye
s
N
o
SL
B
D
E
:
Cl
i
e
n
t
R
e
p
r
e
s
e
n
t
a
t
i
v
e
:
Da
t
e
:
Su
r
v
e
y
T
o
o
l
C
o
d
e
s
Al
l
t
a
r
g
e
t
s
a
n
d
/
o
r
w
e
l
l
p
o
s
i
t
i
o
n
o
b
j
e
c
t
i
v
e
s
h
a
v
e
b
e
e
n
a
c
h
i
e
v
e
d
.
I
h
a
v
e
c
h
e
c
k
e
d
t
o
t
h
e
b
e
s
t
o
f
m
y
a
b
i
l
i
t
y
t
h
a
t
t
h
e
f
o
l
l
o
w
i
n
g
d
a
t
a
i
s
c
o
r
r
e
c
t
:
Su
r
f
a
c
e
C
o
o
r
d
i
n
a
t
e
s
De
c
l
i
n
a
t
i
o
n
&
C
o
n
v
e
r
g
e
n
c
e
GR
S
S
u
r
v
e
y
C
o
r
r
e
c
t
i
o
n
s
SECTION 4b.
Directional Survey
Plot
!" #$ %&'(%
)!
*+,-*.
/,/& ',0--12 & ,3
43/,//
&50-'62
5160(-
,,07-" 870',665
9
$ 675--/0-5 5'1('5#. : ,05'12
$ -7/6501( 1,7'75#.
,07777,5-'
;&<# <4
8/-,#4$9
!
%!
!"#$%#&
'
(
')
&*
+,-./0
1'%
2('
(
/*
&1,
2('
(
/*
3*
./0
42(4 '
(
45
5 /*
,6
7
'(
42(4 '
(
45
/*
282.73
2('
(
/*
')
&*
+,
4 5
5
5
%&
5
"
5
')
&*
+,-./0
1'%
2('
(
"%
&1,
2('
(
"%
3*
./0
42(4 '
(
45
"5 %4
,6
7
'(
42(4 '
(
45
"%
282.73
2('
(
"%
')
&*
+,
'."
)
'
92:'4
2!(4
;79/
'.
;7
2!
SECTION 10.
Surface Abandonment
10a. Summary
10b. Photos
SECTION 10a.
Surface Abandonment
Summary
MEMORANDUM STATE OF ALASKA
Alaska Oil and Gas Conservations Commission
Date: 5/12/2022
RE: Surface Abandonment
Great Bear Pantheon, LLC
PTD 221-106; Sundry 322-155
4/16/22:
The Theta West #1 well head was cutoff 4’ below tundra grade. All inner strings of pipe were verified to
have cement to surface. Integrity of cement was checked with a five foot bar. The ¼” marker plate
containing all required well information was welded onto the outer conductor pipe. A complete bead of
weld was visually verified around the outer edge of the pipe where it meets the marker plate. The cellar was
then backfilled to reestablish grade.
SECTION 10b.
Surface Abandonment
Photos
SECTION 5.
FRAC TREATMENT REPORT
Attachment G
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
FracCADE*
STIMULATION PROPOSAL
Operator : Great Bear Pantheon
Well : Theta West
County : North Slope
State : Alaska
Country : United States
Prepared for : Michael Duncan Service Point : Prudhoe Bay, Alaska
Business Phone : 1 907 659 2434
Date Prepared : 3-06-2021 FAX No. : 1 907 659 2538
Prepared by : Brett McLaughlin
Phone : 432-231-9070
E-Mail Address : bmclaughlin3@slb.com
* Mark of Schlumberger
Disclaimer Notice:
This information is presented in good faith, but no warranty is given by and Schlumberger assumes no liability for advice or recommendations made concerning results to be obtained from the use of any product or service.
The results given are estimates based on calculations produced by a computer model including various assumptions on the well, reservoir and treatment. The results depend on input data provided by the Operator and
estimates as to unknown data and can be no more accurate than the model, the assumptions and such input data. The information presented is Schlumberger's best estimate of the actual results that may be achieved and
should be used for comparison purposes rather than absolute values. The quality of input data, and hence results, may be improved through the use of certain tests and procedures which Schlumberger can assist in selecting.
The Operator has superior knowledge of the well, the reservoir, the field and conditions affecting them. If the Operator is aware of any conditions whereby a neighboring well or wells might be affected by the treatment
proposed herein it is the Operator's responsibility to notify the owner or owners of the well or wells accordingly.
Prices quoted are estimates only and are good for 30 days from the date of issue. Actual charges may vary depending upon time, equipment, and material ultimately required to perform these services.
Freedom from infringement of patents of Schlumberger or others is not to be inferred.
2 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Section 1: Wellbore Configuration
Bottom Hole Temperature 200 degF
Deviated Hole NO
Treat Down Tubing
Well Type Vertical
Well Location OnShore
Tubing Data
OD
(in)
Weight
(lb/ft)
ID
(in)
Depth
(ft)
5.5 17 4.892 7000
3.500 9.2 2.990 8285
Perforation Data – Stage 1
Top
MD
(ft)
Top
TVD
(ft)
Bottom
MD
(ft)
Bottom
TVD
(ft)
Shot
Density
(shot/ft)
Number
Diameter
(in)
8070 8070 8080 8080 6.00 60 .28
Perforation Data – Stage 2
Top
MD
(ft)
Top
TVD
(ft)
Bottom
MD
(ft)
Bottom
TVD
(ft)
Shot
Density
(shot/ft)
Number
Diameter
(in)
7770 7770 7780 7780 6.00 60 .28
Perforation Data – Stage 3
Top
MD
(ft)
Top
TVD
(ft)
Bottom
MD
(ft)
Bottom
TVD
(ft)
Shot
Density
(shot/ft)
Number
Diameter
(in)
7590 7590 7600 7600 6.00 60 .28
3 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Section 2: Propped Fracture Schedule – Stage 1
4 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Pumping Schedule
The following is the Pumping Schedule to achieve a propped fracture half-length (X f ) greater than 200 ft
Job Description
Step
Name
Pump
Rate
(bbl/min)
Fluid Name
Step Clean
Fluid
Volume
(gal)
Gel
Conc.
(lb/mgal)
Prop.
Type and Mesh
Prop.
Conc.
(PPA)
Load Hole/Br 10.0 WF110 7800 10.0 0.00
ISIP 5-10-15 0.0 WF110 0 10.0 0.00
FET 40.0 WF110 6800 10.0 0.00
ISIP 5-10-15 0.0 WF110 0 10.0 0.00
PAD 40.0 WF110 24000 10.0 0.00
0.5 PPA 40.0 WF110 9000 10.0 40/70 Sand 0.50
1.0 PPA 40.0 WF110 9000 10.0 40/70 Sand 1.00
1.5 PPA 40.0 WF110 9000 10.0 40/70 Sand 1.50
2.0 PPA 40.0 WF110 9000 10.0 40/70 Sand 2.00
2.5 PPA 40.0 WF110 9000 10.0 40/70 Sand 2.50
2.5 PPA 40.0 YF115FlexD 9000 15.0 40/70 Sand 2.50
3.0 PPA 40.0 YF115FlexD 9000 15.0 40/70 Sand 3.00
4.0 PPA 40.0 YF115FlexD 9500 15.0 40/70 Sand 4.00
5.0 PPA 40.0 YF115FlexD 9000 15.0 40/70 Sand 5.00
5.0 PPA 40.0 YF115FlexD 9200 15.0 20/40 Carbo 5.00
6.0 PPA 40.0 YF115FlexD 9000 15.0 20/40 Carbo 6.00
FLUSH 40.0 WF115 6320 15.0 0.00
FreezeProtec 40.0 FreezeProtect 1000 0.00
Please note that this pumping schedule is under-displaced by 5.0 bbl.
Fluid Totals
2142 bbl of WF110
1320 bbl of YF115FlexD
Proppant Totals
200,000 lb of 40/70 Sand
100,000 lb Of 20/40 C-Lite
Pad Percentages
% PAD Clean 19.4
% PAD Dirty 17.5
5 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Stage 1
Initial Fracture Top TVD.......................... 8068.0 ft
Initial Fracture Bottom TVD....................... 8081.0 ft
Propped Fracture Half-Length...................... 858.9 ft
Propped Width at Well............................. 0.015 in
Average Propped Width............................. 0.0293 in
Average Gel Concentration......................... 571.7 lb/mgal
Average Fluid Retained Factor..................... 0.60
EOJ Hydraulic Height at Well...................... 75.3 ft
EOJ Net Pressure.................................. 2497 psi
Efficiency........................................ 0.404
Effective Conductivity............................ 2669 md.ft
Effective Fcd..................................... 3.1
Max Surface Pressure.............................. 5704 psi
Figure 1. Conductivity Plots
Proppant Concentration
0.0 PPA
2.0 PPA
4.0 PPA
6.0 PPA
8.0 PPA
> 10.0 PPA
Length (ft)
0 200 400 600 800 1000 1200 1400
Fracture Width
Frac#1 MD = 9412.55ft
Width (in)
-2.00 0 2.00
Lithology and Stress
Stress (psi)
5000 6000 7000
Sat. and Young's Modulus
We
l
l
D
e
p
t
h
(
T
V
D
)
(
f
t
)
7900
7950
8000
8050
8100
8150
8200
Young's Mod. (psi)
1.0x1062.0x1063.0x1064.0x1065.0x106
6 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 2. Flow Capacity
7 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 3. Surface Pressure Plot
8 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 4. Net Pressure Plot
9 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Section 3: Propped Fracture Schedule – Stage 2
10 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Pumping Schedule
The following is the Pumping Schedule to achieve a propped fracture half-length (X f ) greater than 200 ft
Job Description
Step
Name
Pump
Rate
(bbl/min)
Fluid Name
Step Clean
Fluid
Volume
(gal)
Gel
Conc.
(lb/mgal)
Prop.
Type and Mesh
Prop.
Conc.
(PPA)
Load Hole/Br 10.0 WF110 7700 10.0 0.00
ISIP 5-10-15 0.0 WF110 0 10.0 0.00
FET 40.0 WF110 6800 10.0 0.00
ISIP 5-10-15 0.0 WF110 0 10.0 0.00
PAD 40.0 WF110 17000 10.0 0.00
0.5 PPA 40.0 WF110 6600 10.0 40/70 Sand 0.50
1.0 PPA 40.0 WF110 7300 10.0 40/70 Sand 1.00
1.5 PPA 40.0 WF110 7300 10.0 40/70 Sand 1.50
2.0 PPA 40.0 WF110 7300 10.0 40/70 Sand 2.00
2.5 PPA 40.0 WF110 7300 10.0 40/70 Sand 2.50
2.5 PPA 40.0 YF115FlexD 3000 15.0 40/70 Sand 2.50
3.0 PPA 40.0 YF115FlexD 7300 15.0 40/70 Sand 3.00
4.0 PPA 40.0 YF115FlexD 7300 15.0 40/70 Sand 4.00
5.0 PPA 40.0 YF115FlexD 2400 15.0 40/70 Sand 5.00
5.0 PPA 40.0 YF115FlexD 7200 15.0 20/40 Carbo 5.00
6.0 PPA 40.0 YF115FlexD 6500 15.0 20/40 Carbo 6.00
FLUSH 40.0 WF115 6150 15.0 0.00
FreezeProtec 40.0 FreezeProtect 1000 0.00
Please note that this pumping schedule is under-displaced by 5.0 bbl.
Fluid Totals
1773 bbl of WF110
802 bbl of YF115FlexD
Proppant Totals
125,000 lb of 40/70 Sand
75,000 lb Of 20/40 C-Lite
Pad Percentages
% PAD Clean 19.7
% PAD Dirty 17.8
11 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Stage 2
Initial Fracture Top TVD.......................... 7768 ft
Initial Fracture Bottom TVD....................... 7781 ft
Propped Fracture Half-Length...................... 710.3 ft
Propped Width at Well............................. 0.041 in
Average Propped Width............................. 0.201 in
Average Gel Concentration......................... 455.2 lb/mgal
Average Fluid Retained Factor..................... 0.60
EOJ Hydraulic Height at Well...................... 87.2 ft
EOJ Net Pressure.................................. 1633 psi
Efficiency........................................ 0.356
Effective Conductivity............................ 2112 md.ft
Effective Fcd..................................... 3.0
Max Surface Pressure.............................. 4586 psi
Figure 5. Stage 2 Conductivity Plot
Proppant Concentration
0.0 PPA
2.0 PPA
4.0 PPA
6.0 PPA
8.0 PPA
> 10.0 PPA
Length (ft)
0 100 200 300 400 500 600 700 800 900 1000
Fracture Width
Width (in)
-2.00 -1.00 0 1.00 2.00
Lithology and Stress
Stress (psi)
450050005500600065007000
Sat. and Young's Modulus
We
l
l
D
e
p
t
h
(
T
V
D
)
(
f
t
)
7400
7500
7600
7700
7800
7900
8000
Young's Mod. (psi)
1.0x1062.0x1063.0x1064.0x1065.0x1066.0x106
12 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 6. Stage 2 Design Pressures
13 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 7. Stage 2 Flow Capacity
14 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 8. Stage 2 Net Pressure Plot
15 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Section 3: Propped Fracture Schedule – Stage 3
16 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Pumping Schedule
The following is the Pumping Schedule to achieve a propped fracture half-length (X f ) greater than 200 ft
Job Description
Step
Name
Pump
Rate
(bbl/min)
Fluid Name
Step Clean
Fluid
Volume
(gal)
Gel
Conc.
(lb/mgal)
Prop.
Type and Mesh
Prop.
Conc.
(PPA)
Load Hole/Br 10.0 WF110 7600 10.0 0.00
ISIP 5-10-15 0.0 WF110 0 10.0 0.00
FET 40.0 WF110 6800 10.0 0.00
ISIP 5-10-15 0.0 WF110 0 10.0 0.00
PAD 40.0 WF110 21000 10.0 0.00
0.5 PPA 40.0 WF110 8000 10.0 40/70 Sand 0.50
1.0 PPA 40.0 WF110 9000 10.0 40/70 Sand 1.00
1.5 PPA 40.0 WF110 9000 10.0 40/70 Sand 1.50
2.0 PPA 40.0 WF110 9000 10.0 40/70 Sand 2.00
2.5 PPA 40.0 WF110 9000 10.0 40/70 Sand 2.50
2.5 PPA 40.0 YF115FlexD 6000 15.0 40/70 Sand 2.50
3.0 PPA 40.0 YF115FlexD 9000 15.0 40/70 Sand 3.00
4.0 PPA 40.0 YF115FlexD 9000 15.0 40/70 Sand 4.00
5.0 PPA 40.0 YF115FlexD 6000 15.0 40/70 Sand 5.00
5.0 PPA 40.0 YF115FlexD 7200 15.0 20/40 Carbo 5.00
6.0 PPA 40.0 YF115FlexD 6500 15.0 20/40 Carbo 6.00
FLUSH 40.0 WF115 6000 15.0 0.00
FreezeProtec 40.0 FreezeProtect 1000 0.00
Please note that this pumping schedule is under-displaced by 5.0 bbl.
Fluid Totals
2057 bbl of WF110
1040 bbl of YF115FlexD
Proppant Totals
175,000 lb of 40/70 Sand
75,000 lb Of 20/40 C-Lite
Pad Percentages
% PAD Clean 19.7
% PAD Dirty 17.8
17 Attachment G
Client : Great Bear Pantheon
Well : Theta West
Formation : BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Stage 3
Initial Fracture Top TVD.......................... 7588 ft
Initial Fracture Bottom TVD....................... 7601 ft
Propped Fracture Half-Length...................... 825.1 ft
Propped Width at Well............................. 0.010 in
Average Propped Width............................. 0.247 in
Average Gel Concentration......................... 485.2 lb/mgal
Average Fluid Retained Factor..................... 0.60
EOJ Hydraulic Height at Well...................... 78.0 ft
EOJ Net Pressure.................................. 2022 psi
Efficiency........................................ 0.377
Effective Conductivity............................ 2266 md.ft
Effective Fcd..................................... 2.7
Max Surface Pressure.............................. 4875 psi
Figure 9. Stage 2 Conductivity Plot
Proppant Concentration
0.0 PPA
2.0 PPA
4.0 PPA
6.0 PPA
8.0 PPA
> 10.0 PPA
Length (ft)
0 200 400 600 800 1000 1200
Fracture Width
Width (in)
-2.00 0 2.00
Lithology and Stress
Stress (psi)
4000 5000 6000 7000
Sat. and Young's Modulus
We
l
l
D
e
p
t
h
(
T
V
D
)
(
f
t
)
7400
7450
7500
7550
7600
7650
7700
Young's Mod. (psi)
1.0x1062.0x1063.0x1064.0x1065.0x106
18 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 10. Stage 2 Design Pressures
19 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 11. Stage 2 Flow Capacity
20 Attachment G
Client : Great Bear Pantheon
Well :Theta West
Formation :BFF
District : Prudhoe Bay, Alaska
Sc
h
l
u
m
b
e
r
g
e
r
P
r
i
v
a
t
e
Schlumberger-Private
Figure 12. Stage 2 Net Pressure Plot
April,222022
SteveDavies
SeniorPetroleumGeologist
AOGCC
Steve.davies@alaska.gov
RE:TransmittalLetter
Steve:
GreatBearPantheonhassubmittedthefollowingdataperrequestfromtheAOGCConApril22nd,2022:
x 1.SundryReport(Form10Ͳ407)
x 2.DailyDrillingReports
x 3.CompletionReports
x 4.DirectionalSurveys
x 5.FracTreatmentReport
x 6.WellboreSchematics
x 7.WellTestingData_Reports
x 8.Logs
x 9.ListofFormations&GeologicalMarkersObserved
Ifanyfurtherinformationisneeded,pleaseletusknow.
Sincerely,
MichaelDuncan
ChiefOperatingOfficer
(817)240Ͳ3865
PTD: 221-106
LWD: T36493
Mudlogs: T36494
Wireline: T36495
Well Testing: T36496
List of Formations: T36497
Frac Treatment Reports: T36498
Kayla
Junke
Digitally signed by
Kayla Junke
Date: 2022.04.28
10:24:38 -08'00'
2022-0417_Surface_Abandon_ThetaWest-1_ae
Page 1 of 2
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE: 4-19-2022
P. I. Supervisor
FROM: Adam Earl SUBJECT: Surface Abandonment
Petroleum Inspector Theta West #1
Great Bear Pantheon LLC
PTD 2211060; Sundry 322-155
4-17-2022: I traveled to Theta West #1 to witness the surface abandonment. The well
was cut off @ 39 inches below tundra grade. Hard set-up cement was found in all
strings. The marker plate has the correct information scribed on. The approval was
given to weld on the plate and bury. Final site clearance inspection to follow this
summer.
Attachments: Photos (2)
2022-0417_Surface_Abandon_ThetaWest-1_ae
Page 2 of 2
Surface Abandonment – Theta West #1 (PTD 2211060)
Photos by AOGCC Inspector A. Earl
4/17/2022
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section: 32 Township: 7N Range: 11E Meridian: Umiat
Drilling Rig: NA Rig Elevation: NA Total Depth: 8376 ft MD Lease No.: ADL 394039
Operator Rep: Suspend: P&A: X
Conductor: 20" O.D. Shoe@ 75 Feet Csg Cut@ Feet
Surface: 9 5/8" O.D. Shoe@ 3030 Feet Csg Cut@ Feet
Intermediate: 5 1/2" O.D. Shoe@ 8376 Feet Csg Cut@ Feet
Production: 3 1/2" O.D. Shoe@ 8277 Feet Csg Cut@ Feet
Liner: O.D. Shoe@ Feet Csg Cut@ Feet
Tubing: O.D. Tail@ Feet Tbg Cut@ Feet
Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified
Fullbore Bridge plug 7537 ft 7537 ft 9.4 ppg C.T. Tag
Fullbore Balanced 3264 ft 3002 ft 9.4 ppg Wireline tag
Initial 15 min 30 min 45 min Result
Tubing 3300 3170 3114
IA
OA
Initial 15 min 30 min 45 min Result
Tubing 3320 3145 3088
IA 25 27 28
OA 29 28 27
Remarks:
Attachments:
Jerry Otto
P
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
4/3/22: I arrived on location to witness the tag and pressure test on the CIBP that was to be the bottom of isolation in the P&A
operation. The top of the plug was found @ 7,537', then 3000lb of down force was applied to the plug then re-tagged, showing
the same depth. A 3000 psi pressure test was completed, going 10% over the required test pressure and passed. Operator
was to lay in 13 bbls cement on top of the CIBP to bring cement top up into the 5.5-inch casing (not witnessed). 4/5/22: I
arrived on location to witness the tag and pressure test of the second cement plug in the P&A operation. Wireline performed the
tag using a bailer with a tool weight of 160 lbs. Top of cement was found @ 3,002 ft MD and a good cement sample was
retrieved. A 3000 psi pressure test was completed with passing results.
April 5, 2022
Lou Laubenstein
Well Bore Plug & Abandonment
Theta West #1
Great Bear Pantheon, LLC
PTD 2211060; Sundry 322-155
none
Test Data:
P
Casing Removal:
rev. 11-28-18 2022-0405_Plug_Verification_Theta-West-1_ll
9
9
9 9 9
9 9
9
9
9
9
9
9
9
9
9
9
9
9
3000lb of down force was applied to the plug
second cement plug
bottom of isolation in the P&A
Top of cement was found @ 3,002 ft MD
g
good cement sample
James B. Regg Digitally signed by James B. Regg
Date: 2022.04.13 18:02:17 -08'00'
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUBBBBBBBBBBBBBBBBBBB
2SHUDWRU1DPH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU )LHOG3RROV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
1$ 1$
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU QD
6XUIDFH
3URGXFWLRQ
/LQHU
3DFNHUVDQG66697\SH 3DFNHUVDQG66690'IWDQG79'IW
3DFNHUDW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH
0LFKDHO'XQFDQ &RQWDFW(PDLO
&RQWDFW3KRQH
$XWKRUL]HG7LWOH &22
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
3HUIRUDWLRQ'HSWK0'IW
/HQJWK 6L]H 79' %XUVW
0'
QD
35(6(17:(//&21',7,216800$5<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/ ([SORUDWLRQ
$UFWLF%OYG6WH$QFKRUDJH$.
*UHDW%HDU3DQWKHRQ//&
7KHWD:HVW1$
7XELQJ*UDGH 7XELQJ0'IW3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
%DNHU+\G6HW)$3HUPDQHQW3URGXFWLRQ3NU
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQ JLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
0LFKDHO'XQFDQ
PLFKDHO#JUHDWEHDUSHWURFRP
DSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
%237HVW0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
HFWLRQ0,75HT
G"<HV 1R
SWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$2*&&86(21/<
&RQWDFW1DPH
0LFKDHO'XQFDQ &RQWDFW(PDLO
&RQWDFW3KRQH
H&22
FHUWLI\II WKDWWKHIRUH\JRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
P HDQG
XUHZLWK'DWH
0LFKDHO'XQFDQ
PLFKDHO#JUHDWEHDUSHWURFRP
:HOO6WDWXVDIWHUSURSRVHGZRUN
2,/:,1- :'63/6XVSHQGHG
*$6:$**6725 63/8*
*,1-2S6KXWGRZQ$EDQGRQHG
SURYDO 'DWH
HVHQWDWLYH
'DWHIRU
2SHUDWLRQV
:HOO&ODVVDIWHUSURSRVHGZRUN
([SORUDWRU\6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
QWV 3URSRVDO6XPPDU\:HOOERUHVFKHPDWLF
DWLRQV3URJUDP %236NHWFK
66697\SH 3DFNHUVDQG66690'IWDQG79'IW
3DFNHU DW
W)$3HUPDQHQW3URGXFWLRQ3NU
7XELQJ0'IW7XELQJ*UDGH7XELQJ6L]H3HUIRUDWLRQ'HSWK79'IW
SWK0'IW
RQ
H
QDQD
RU
DO
&ROODSVH%XUVW79'6L]H/HQJWKJ
-XQN0'
1$
3OXJV0'
1$
0363SVL
(IIHFWLYH'HSWK79'
(IIHFWLYH'HSWK0'
7RWDO'HSWK79'IW
'IW
35(6(17:(//&21',7,216800$5<
)LHOG3RROV
([SORUDWLRQ
HVLJQDWLRQ/HDVH1XPEHU
:HOO1DPHDQG1XPEHU
7KHWD:HVW
J
DWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
SHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
1$
3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
&XUUHQW:HOO&ODVV
([SORUDWRU\'HYHORSPHQW
6WUDWLJUDSKLF 6HUYLFH
YG6WH$QFKRUDJH$.
DPH
QWKHRQ//&
$EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:H 2SHUDWLRQVVKXWGRZQTXHVWSDLU:HOO
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDPOO7XELQJ
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO5HHQWHU6XVS:HOO $OWHU&DV 2WKHUU&DVLQJ BBBBBBBBBBBBBBBBBBB
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Samantha Carlisle at 3:15 pm, Mar 21, 2022
2022.03.21
14:23:00
-08'00'
;
;;
6)'
$2*&& LQVSHFWLRQ UHTXLUHG DIWHU FXWRII DQG EHIRUH UHPHGLDO FHPHQWLQJ
:HOO DEDQGRQPHQW PDUNHU WR PHHW UHTXLUHPHQWV RI $$&
3KRWR GRFXPHQW DOO VWHSV RI VXUIDFH DEDQGRQPHQW
'6597/
-/&
GWV
Jeremy Price Digitally signed by Jeremy Price
Date: 2022.03.29 16:30:39 -08'00'
RBDMS SJC 040122
6(&7,21
),1$/3 $352&('85(
3OXJJLQJ3URFHGXUHDIWHU)ORZ7HVW
322+Z&7
D5LJRIIZHOO0RYHEDFN&7LQMHFWRUKHDG
5LJXS<-:LUHOLQH
D5,+ZLWK´&,%3
E1RWHIOXLGOHYHO
F5XQGRZQWR¶DW¶SHUPLQ
G6ORZGRZQWR¶SHUPLQZKHQHQWHULQJOLQHU¶±72/
5XQWR¶ SXOOXSVORZWRVHWGHSWK
D6HW:/#¶
322+Z6OLFNOLQH JHWRIIZHOO&ORVHLQFURZQYDOYH
3UHVVXUHWHVWDJDLQVW&,%3XVLQJ&7WLHGLQWREDFNVLGH
D7HVWWRSVLIRUPLQVRUDVSHU$2*&&UHSUHVHQWDWLYH
0RYH&7LQMHFWRUKHDGEDFNRYHUZHOO 5,+ZFHPHQWQR]]OH%+$
D5XQWRGHSWK¶
E6ORZGRZQWRWDJ&,%3#¶
F3XOOXS¶
%HJLQSXPSLQJFHPHQWDWESP SXOOLQJXS&7#IWPLQIRUEEOV
D&RQWLQXHSXPSLQJDWESP VORZUHHOVSHHGWRIWPLQIRUEEOV
E6WRSFRLO VSRWFHPHQWWRHQGRIFRLO
F&LUFXODWHFRLOZKLOHSXOOLQJXSWR¶
%HJLQOD\LQJLQFHPHQW#ESP SXOOLQJXS&7#IWPLQIRUEEOV
D6WRSFRLO VSRWFHPHQWWRHQGRIUHHODW¶
E&LUFXODWHUHHOZKLOHSXOOLQJXSWR¶
F&RQWLQXHSXOOLQJXSIURP¶GLVSODFLQJZLWKGLHVHOIRUIUHH]HSURWHFWLRQ
322+Z&7
D5LJGRZQ&7 PRYHRIIORFDWLRQ
5LJXS3ROODUG6OLFNOLQHWRZHOO
D0DNHXSZHLJKWEDU EDOHUWRROIRU$2*&&WDJ
E5,+WR¶IRUSRVLWLYHSOXJWDJDVSHU$2*&&UHSUHVHQWDWLYH
F8SRQSRVLWLYHWDJ322+ZVOLFNOLQH
3UHVVXUHWHVWFHPHQWSOXJXVLQJ/LO5HGSXPSWUXFN
D7HVWWRSVLIRUPLQVRUDVSHU$2*&&UHSUHVHQWDWLYH
0DNHXSWXELQJSXQFKWRRORQVOLFNOLQH UXQEDFNLQKROH
D5XQWRGHSWKRIIW
WDJ&,%3#¶
97/
3UHVVXUHWHVWD
&,%3 37 WDJ UHTXLUH $2*&& 6WDWH :LWQHVV
KRXU QRWLILFDWLRQ UHTXLUHG IRU $2*&&
E$FWLYDWHWXELQJSXQFKWRSHQHWUDWH´FDVHDOORZLQJDFFHVVWR´DQQXOXV
F322+ZVOLFNOLQH
G&KHFNIRUFLUFXODWLRQ
H5'023ROODUGVOLFNOLQHXQLW
1'´IUDFWUHHYDOYHVWDFN
D18´FDVLQJYDOYHNZRUNLQJSUHVVXUH
5LJXSFHPHQWSXPSWR´FDVLQJYDOYH
D2SHQò´WR´DQQXOXVYDOYH
E3XPSEEOVFOHDQIOXLGLQWRFDVLQJWRHVWDEOLVKFLUFXODWLRQ
F2QFHFLUFXODWLRQLVHYLGHQWEHJLQSXPSLQJ$UFWLFTXDOLW\FHPHQWLQWR´
G3XPSEEOV$UFWLFFHPHQWLQWRFDVLQJ DQQXOXVYLDSXQFKHGKROHV
H0RQLWRUDQQXOXVFHPHQWUHWXUQV
I6KXWGRZQFHPHQWSXPS ZDVKXSVXUIDFHHTXLSPHQW5'02
J$OORZFHPHQWWRVHWKUV FDOOIRU$2*&&ZLWQHVVKUQRWLFH
K:HOOLVUHDG\IRUVXUIDFH3 $RSHUDWLRQV
3HUIRUPILQDO0,7WRFDVLQJ DQQXOXVWHVWLQJWRSVL5HFRUGWHVWV
D3HUIRUP''7¶VWRFRQILUPDOOZHOOERUHSUHVVXUHVUHDG]HUR
E5HPRYH´FDVLQJYDOYH DGMDFHQWZHOOFRQQHFWLRQV&OHDUDUHD
F([FDYDWHWRUHPRYHFHOODU DFFHVVFRQGXFWRUDSSUR[LPDWHO\¶EHORZJURXQGOHYHO
G&XWZHOOKHDGDWJURXQGOHYHOXVLQJWRUFKRUFDVLQJFXWWLQJGHYLFH
H+DYHVDFNFHPHQWRQKDQGWRWRSRIIFDVLQJVDQQXOXVWRJURXQGOHYHODVUHTXLUHG
I:HOGRQPDUNHUSODWH GULOO´ZHHSKROHDVSHU$2*&&
L:HOOPDUNHUSODWHWRPHHW$$&UHTXLUHPHQWV
*UHDW%HDU3DQWKHRQ
7KHWD:HVW
37'
$3,
J'RFXPHQWDOOVWHSVLQ:65 ILQDOVXUIDFH3 $UHSRUWZLWKSKRWRV
K%DFNILOOKROH
L2EWDLQILQDOVLWHDSSURYDOIURP$2*&& *%3(QYLURQPHQWDO&RRUGLQDWRU5'02
6(&7,21D
7+(7$:(67:%6
$6,6
dŚĞƚĂtĞƐƚͲtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐͲŽŵƉůĞƚĞ&&/ŶƚĞƌǀĂů
ŽŶĚƵĐƚŽƌ,ŽůĞ ŽŶĚƵĐƚŽƌWŝƉĞ
dždždždždždž dždždždždždždždždždždždždž ĞƉƚŚ
^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϰϬ ůďͬĨƚ
W&ĞƉƚŚ
WƌŽĚƵĐƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ
ϱ͘ϱΗ ůďͬĨƚ
'ƌĂĚĞ͗>ϴϬ
,ƵĞ^ŚĂůĞͲŽƚƚŽŵΛϳϰϮϬΖ
&&ηϭWĞƌĨƐ͗ϳϱϵϱΖͲϳϲϬϱΖ
&ƌĂĐWůƵŐΛϳϲϴϱΖ
&&ηϮWĞƌĨƐ͗ϳϳϰϱΖͲϳϳϱϱΖ &&WĞƌĨƐ;ϲƐƉĨ͖ϲϬĚĞŐƉŚĂƐĞ͖Ϭ͘ϯϲΗ,Ϳ
&ƌĂĐWůƵŐΛϴϬϬϱΖ
&&ηϭWĞƌĨƐ͗ϴϬϲϱΖͲϴϬϳϱΖ
,Z^ŚĂůĞͲdŽƉΛϴϰϭϬΖWdͲϴϯϳϲΖ
dͲϴϰϱϬΖ
ϯ͘ϱΗ>ŝŶĞƌ tĞŝŐŚƚ͗ϵ͘ϮůďͬĨƚ
WĂĐŬĞƌdŽƉͲϳϬϮϲΖ >ŝŶĞƌdŽƉͲϳϬϯϯΖ
WĂĐŬĞƌŽƚƚŽŵͲϳϬϯϯΖ >ŝŶĞƌŶĚͲϴϮϳϳΖ
'ƌĂĚĞ dK
ϭϳ WͲϭϭϬ ϲϰϯϬΖ
d
dK ĞƉƚŚ
^ƵƌĨĂĐĞ ϯϭϲϰΖ ΕϭϱϬϬΖ
>ͲϴϬ
tĞŝŐŚƚ
ϭϮϭͬϰΗ ϵϱͬϴΗ
dK
W& W&^ƵƌĨĂĐĞ ϳϱΖ
tĞŝŐŚƚ
ϮϴΗ ϮϬΗ ϭϮϵůďͬĨƚ
6(&7,21E
7+(7$:(67:%6
3 $
dŚĞƚĂtĞƐƚͲtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐͲ&ŝŶĂůWΘΎŝĂŐƌĂŵƐĂƌĞŶŽƚƚŽƐĐĂůĞΎ
ĞŵĞŶƚƉůƵŐ͗ϮϬϬΖƚŽ^ƵƌĨĂĐĞ
ŽŶĚƵĐƚŽƌ,ŽůĞ ŽŶĚƵĐƚŽƌWŝƉĞ
dždždždždždž dždždždždždždždždždždždždž ĞƉƚŚ
ĞŵĞŶƚƉůƵŐ͗ϯϬϲϰΖ;ĐĂůĐͿΖͲϯϮϲϰΖ;ϲďďůƐͿ
^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϰϬ ůďͬĨƚ
W&ĞƉƚŚ
WƌŽĚƵĐƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ
ϱ͘ϱΗ ůďͬĨƚ
'ƌĂĚĞ͗>ϴϬ
ĞŵĞŶƚƉůƵŐ͗ϲϴϳϲΖ;ĐĂůĐͿΖͲϳϱϰϱΖ;ϭϯďďůƐͿ
/WͲϳϱϰϱΖ
,ƵĞ^ŚĂůĞͲŽƚƚŽŵΛϳϰϮϬΖ
&&ηϭWĞƌĨƐ͗ϳϱϵϱΖͲϳϲϬϱΖ
&ƌĂĐWůƵŐΛϳϲϴϱΖ
&&ηϮWĞƌĨƐ͗ϳϳϰϱΖͲϳϳϱϱΖ &&WĞƌĨƐ;ϲƐƉĨ͖ϲϬĚĞŐƉŚĂƐĞ͖Ϭ͘ϯϲΗ,Ϳ
&ƌĂĐWůƵŐΛϴϬϬϱΖ
&&ηϭWĞƌĨƐ͗ϴϬϲϱΖͲϴϬϳϱΖ
,Z^ŚĂůĞͲdŽƉΛϴϰϭϬΖ
tĞŝŐŚƚ
ϮϴΗ ϮϬΗ ϭϮϵůďͬĨƚ
dK
W& W&^ƵƌĨĂĐĞ ϳϱΖ
tĞŝŐŚƚ
ĞƉƚŚ
^ƵƌĨĂĐĞ ϯϭϲϰΖ
WdͲϴϯϳϲΖ
yyyy
ϭϮϭͬϰΗ ϵϱͬϴΗ >ͲϴϬ d
dK
ϯ͘ϱΗ>ŝŶĞƌ tĞŝŐŚƚ͗ϵ͘ϮůďͬĨƚ
WĂĐŬĞƌdŽƉͲϳϬϮϲΖ >ŝŶĞƌdŽƉͲϳϬϯϯΖ
WĂĐŬĞƌŽƚƚŽŵͲϳϬϯϯΖ >ŝŶĞƌŶĚͲϴϮϳϳΖ
'ƌĂĚĞ dK
ϭϳ WͲϭϭϬ
ΕϭϱϬϬΖ
ĂƐŝŶŐΘϵϱͬϴΗŶŶƵůƵƐ
dͲϴϰϱϬΖ
ϲϰϯϬΖ
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUBBBBBBBBBBBBBBBBBBB
2SHUDWRU1DPH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU )LHOG3RROV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
1$ 1$
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU QD
6XUIDFH
3URGXFWLRQ
/LQHU
3DFNHUVDQG66697\SH 3DFNHUVDQG66690'IWDQG79'IW
3DFNHUDW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH
0LFKDHO'XQFDQ &RQWDFW(PDLO
&RQWDFW3KRQH
$XWKRUL]HG7LWOH&22
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
0LFKDHO'XQFDQ
PLFKDHO#JUHDWEHDUSHWURFRP
7XELQJ*UDGH 7XELQJ0'IW3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
0DUFKWK
%DNHU+\G6HW)$3HUPDQHQW3URGXFWLRQ3NU
35(6(17:(//&21',7,216800$5<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/ ([SORUDWLRQ
$UFWLF%OYG6WH$QFKRUDJH$.
*UHDW%HDU3DQWKHRQ//&
7KHWD:HVW1$
/HQJWK 6L]H 79' %XUVW
0'
QD
3HUIRUDWLRQ'HSWK0'IW
DSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
%237HVW0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQF H
FWLRQ0,75HT
G"<HV 1R
SWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$2*&&86(21/<
&RQWDFW1DPH
0LFKDHO'XQFDQ &RQWDFW (PDLO
&RQWDFW3KRQH
H&22
FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
PHDQG
UHZLWK'DWH
0LF KDHO'XQFDQ
PLFKDHO#JUHDWEHDUSHWURFRP
'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
2SHUDWLRQV 2,/:,1- :'63/6XVSHQGHG
SURYDO 'DWH *$6:$**6725 63/8*
HVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
WV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF:HOO&ODVVDIWHUSURSRVHGZRUN
DWLRQV3URJUDP %236NHWFK([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
6697\SH 3DFNHUVDQG66690'IWDQG79'IW
3DFNHU DW
)$3HUPDQHQW3URGXFWLRQ3NU
7XELQJ*UDGH 7XELQJ0'IW7XELQJ6L]H3HUIRUDWLRQ'HSWK79'IW
SWK0'IW
RQ
QDQD
RU
DO
&ROODSVH6L]H 79' %XUVW/HQJWK
-XQN0'
1$
(IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0'
1$1$
7RWDO'HSWK79'IW
'IW
35(6(17:(//&21',7,216800$5<
VLJQDWLRQ/HDVH1XPEHU )LHOG3RROV
([SORUDWLRQ
J:HOO1DPH DQG1XPEHU
WLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
SHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
7KHWD:HVW 1$
PH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\'HYHORSPHQW
6WUDWLJUDSKLF 6HUYLFH $3,1XPEHU
YG6WH$QFKRUDJH$.
QWKHRQ//&
$EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:H 2SHUDWLRQVVKXWGRZQXHVWSDLU:HOO
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDPOO7XELQJ
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUHU&DVLQJ BBBBBBBBBBBBBBBBBBB
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Meredith Guhl at 8:19 am, Mar 08, 2022
Michael
Duncan
Digitally signed by
Michael Duncan
Date: 2022.03.08
11:06:49 -06'00'
'65
;
&':
97/ 6)'
GWV
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.03.15
13:49:34 -08'00'
RBDMS SJC 031622
6(&7,21D
$6,6:(//%25(
6&+(0$7,&
dŚĞƚĂtĞƐƚͲtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐͲWƌĞůŝŵŝŶĂƌLJ
ŽŶĚƵĐƚŽƌ,ŽůĞ ŽŶĚƵĐƚŽƌWŝƉĞ
dždždždždždž dždždždždždždždždždždždždž ĞƉƚŚ
^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϰϬ ůďͬĨƚ
W&ĞƉƚŚ
WƌŽĚƵĐƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ
ϱ͘ϱΗ ůďͬĨƚ
'ƌĂĚĞ͗>ϴϬ
,ƵĞ^ŚĂůĞͲŽƚƚŽŵΛϳϰϮϬΖ
ĂůĐ&ƌĂĐ'ƌĂĚŝĞŶƚ͗Ϭ͘ϴϯƉƐŝͬĨƚ
ĂůĐ&ƌĂĐ'ƌĂĚŝĞŶƚ͗Ϭ͘ϴϱƉƐŝͬĨƚ
,Z^ŚĂůĞͲdŽƉΛϴϰϭϬΖ
tĞŝŐŚƚ
ϮϴΗ ϮϬΗ ϭϮϵůďͬĨƚ
tĞŝŐŚƚ
ϭϮϭͬϰΗ
ϲϰϯϬΖ
dK
W& W&
^ƵƌĨĂĐĞ ϯϭϲϰΖ ΕϭϱϬϬΖ
'ƌĂĚĞ
ϭϳ WͲϭϭϬ
dͲϴϰϱϬΖ
WdͲϴϯϳϲΖ
ϯ͘ϱΗ>ŝŶĞƌ tĞŝŐŚƚ͗ϵ͘ϮůďͬĨƚ
WĂĐŬĞƌdŽƉͲϳϬϮϲΖ
WĂĐŬĞƌŽƚƚŽŵͲϳϬϯϯΖ
>ŝŶĞƌdŽƉͲϳϬϯϯΖ
>ŝŶĞƌŶĚͲϴϮϳϳΖ
ϳϱΖ
dK
^ƵƌĨĂĐĞ
dK ĞƉƚŚ
ϵϱͬϴΗ >ͲϴϬ d
6(&7,21E
&203/(7(':(//%25(
6&+(0$7,&
%DVLQ)ORRU)DQ
dŚĞƚĂtĞƐƚͲtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐͲŽŵƉůĞƚĞ&&/ŶƚĞƌǀĂů
ŽŶĚƵĐƚŽƌ,ŽůĞ ŽŶĚƵĐƚŽƌWŝƉĞ
dždždždždždž dždždždždždždždždždždždždž ĞƉƚŚ
^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϰϬ ůďͬĨƚ
W&ĞƉƚŚ
WƌŽĚƵĐƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ
ϱ͘ϱΗ ůďͬĨƚ
'ƌĂĚĞ͗>ϴϬ
,ƵĞ^ŚĂůĞͲŽƚƚŽŵΛϳϰϮϬΖ
&&ηϭWĞƌĨƐ͗ϳϱϵϱΖͲϳϲϬϱΖ
&ƌĂĐWůƵŐΛϳϲϴϱΖ
&&ηϮWĞƌĨƐ͗ϳϳϰϱΖͲϳϳϱϱΖ &&WĞƌĨƐ;ϲƐƉĨ͖ϲϬĚĞŐƉŚĂƐĞ͖Ϭ͘ϯϲΗ,Ϳ
&ƌĂĐWůƵŐΛϴϬϬϱΖ
&&ηϭWĞƌĨƐ͗ϴϬϲϱΖͲϴϬϳϱΖ
,Z^ŚĂůĞͲdŽƉΛϴϰϭϬΖWdͲϴϯϳϲΖ
dͲϴϰϱϬΖ
ϯ͘ϱΗ>ŝŶĞƌ tĞŝŐŚƚ͗ϵ͘ϮůďͬĨƚ
WĂĐŬĞƌdŽƉͲϳϬϮϲΖ >ŝŶĞƌdŽƉͲϳϬϯϯΖ
WĂĐŬĞƌŽƚƚŽŵͲϳϬϯϯΖ >ŝŶĞƌŶĚͲϴϮϳϳΖ
'ƌĂĚĞ dK
ϭϳ WͲϭϭϬ ϲϰϯϬΖ
d
dK ĞƉƚŚ
^ƵƌĨĂĐĞ ϯϭϲϰΖ ΕϭϱϬϬΖ
>ͲϴϬ
tĞŝŐŚƚ
ϭϮϭͬϰΗ ϵϱͬϴΗ
dK
W& W&^ƵƌĨĂĐĞ ϳϱΖ
tĞŝŐŚƚ
ϮϴΗ ϮϬΗ ϭϮϵůďͬĨƚ
6(&7,21
%$6,1)/225)$1
&203/(7,21
3URFHGXUH
'$<6 '$7( 67(3 23(5$7,216 &200(176127$7,216
:2&
3UHVVXUHWHVWWRSVL
5,+ZLWKSHUIRUDWLQJJXQVDQGJDPPDFRUUHODWLRQ
3HUIRUDWHLQWHUYDOVDW
IW
322+
0,58)UDFFUHZ
3UHVVXUHWHVWIUDFVSUHDG
)UDF6WDJH
5,+ZLWKSHUIRUDWLQJJXQVDQGJDPPDFRUUHODWLRQ
3HUIRUDWHLQWHUYDOVDW
IW
322+
0,58)UDFFUHZ
3UHVVXUHWHVWIUDFVSUHDG
)UDF6WDJH
5,+ZLWKSHUIRUDWLQJJXQVDQGJDPPDFRUUHODWLRQ
3HUIRUDWHLQWHUYDOVDW
IW
322+
0,58)UDFFUHZ
3UHVVXUHWHVWIUDFVSUHDG
)UDF6WDJH
5'02)UDF&UHZ
0,58FRLOWXELQJXQLW
08OXEULFDWRUDQGLQMHFWRUKHDG
)XQFWLRQWHVWDQGSUHVVXUHWHVW%23V
3UHVVXUHWHVWSDFNRIIDQGOXEULFDWRUWRSVL
2SHQZHOODQG5,+WR
7DJSOXJ#
383XPSJHOVZHHS
&RQWLQXHGRZQZLWKPRWRU ELW'ULOOSOXJ
7DJQH[WSOXJ#
383XPSJHOVZHHS
&RQWLQXHGRZQZLWKPRWRU ELW'ULOOSOXJ
&RQWLQXHGRZQSDVVHGSHUIRUDWLRQVWR
322+PRYH&7RIIZHOO UHPRYHPRWRUPLOODVVHPEO\
08ZDVKQR]]OHIRU1GLVSHUVLRQ
6WLQJEDFNLQWRZHOO 5,+WR
%HJLQ1#VFIPLQWKURXJKFRLO
)ORZWHVWZHOOSHUHQJLQHHULQJGLUHFWLRQ
/LIWZHOOZLWK1LWURJHQDVGLUHFWHG
&RPSOHWH%DVLQ)ORRU)DQ
6(&7,21
)5$&'(6,*1
6FKOXPEHUJHU
$WWDFKPHQW*6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
&ƌĂĐΎ
^d/Dh>d/KEWZKWK^>
KƉĞƌĂƚŽƌ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
ŽƵŶƚLJ ͗ EŽƌƚŚ^ůŽƉĞ
^ƚĂƚĞ ͗ ůĂƐŬĂ
ŽƵŶƚƌLJ ͗ hŶŝƚĞĚ^ƚĂƚĞƐ
WƌĞƉĂƌĞĚĨŽƌ ͗ DŝĐŚĂĞůƵŶĐĂŶ^ĞƌǀŝĐĞWŽŝŶƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
ƵƐŝŶĞƐƐWŚŽŶĞ ͗ ϭϵϬϳϲϱϵϮϰϯϰ
ĂƚĞWƌĞƉĂƌĞĚ ͗ ϯͲϬϲͲϮϬϮϭ&yEŽ͘ ͗ ϭϵϬϳϲϱϵϮϱϯϴ
WƌĞƉĂƌĞĚďLJ ͗ ƌĞƚƚDĐ>ĂƵŐŚůŝŶ
WŚŽŶĞ ͗ ϰϯϮͲϮϯϭͲϵϬϳϬ
ͲDĂŝůĚĚƌĞƐƐ ͗ ďŵĐůĂƵŐŚůŝŶϯΛƐůď͘ĐŽŵ
ΎDĂƌŬŽĨ^ĐŚůƵŵďĞƌŐĞƌ
ŝƐĐůĂŝŵĞƌEŽƚŝĐĞ͗
dŚŝƐŝŶĨŽƌŵĂƚŝŽŶŝƐƉƌĞƐĞŶƚĞĚŝŶŐŽŽĚĨĂŝƚŚ͕ďƵƚŶŽǁĂƌƌĂŶƚLJŝƐŐŝǀĞŶďLJĂŶĚ^ĐŚůƵŵďĞƌŐĞƌĂƐƐƵŵĞƐŶŽůŝĂďŝůŝƚLJĨŽƌĂĚǀŝĐĞŽƌƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐŵĂĚĞĐŽŶĐĞƌŶŝŶŐƌĞƐƵůƚƐƚŽďĞŽďƚĂŝŶĞĚĨƌŽŵƚŚĞƵƐĞŽĨĂŶLJƉƌŽĚƵĐƚŽƌƐĞƌǀŝĐĞ͘
dŚĞƌĞƐƵůƚƐŐŝǀĞŶĂƌĞĞƐƚŝŵĂƚĞƐďĂƐĞĚŽŶĐĂůĐƵůĂƚŝŽŶƐƉƌŽĚƵĐĞĚďLJĂĐŽŵƉƵƚĞƌŵŽĚĞůŝŶĐůƵĚŝŶŐǀĂƌŝŽƵƐĂƐƐƵŵƉƚŝŽŶƐŽŶƚŚĞǁĞůů͕ƌĞƐĞƌǀŽŝƌĂŶĚƚƌĞĂƚŵĞŶƚ͘dŚĞƌĞƐƵůƚƐĚĞƉĞŶĚŽŶŝŶƉƵƚĚĂƚĂƉƌŽǀŝĚĞĚďLJƚŚĞKƉĞƌĂƚŽƌĂŶĚ
ĞƐƚŝŵĂƚĞƐĂƐƚŽƵŶŬŶŽǁŶĚĂƚĂĂŶĚĐĂŶďĞŶŽŵŽƌĞĂĐĐƵƌĂƚĞƚŚĂŶƚŚĞŵŽĚĞů͕ƚŚĞĂƐƐƵŵƉƚŝŽŶƐĂŶĚƐƵĐŚŝŶƉƵƚĚĂƚĂ͘dŚĞŝŶĨŽƌŵĂƚŝŽŶƉƌĞƐĞŶƚĞĚŝƐ^ĐŚůƵŵďĞƌŐĞƌΖƐďĞƐƚĞƐƚŝŵĂƚĞŽĨƚŚĞĂĐƚƵĂůƌĞƐƵůƚƐƚŚĂƚŵĂLJďĞĂĐŚŝĞǀĞĚĂŶĚ
ƐŚŽƵůĚďĞƵƐĞĚĨŽƌĐŽŵƉĂƌŝƐŽŶƉƵƌƉŽƐĞƐƌĂƚŚĞƌƚŚĂŶĂďƐŽůƵƚĞǀĂůƵĞƐ͘dŚĞƋƵĂůŝƚLJŽĨŝŶƉƵƚĚĂƚĂ͕ĂŶĚŚĞŶĐĞƌĞƐƵůƚƐ͕ŵĂLJďĞŝŵƉƌŽǀĞĚƚŚƌŽƵŐŚƚŚĞƵƐĞŽĨĐĞƌƚĂŝŶƚĞƐƚƐĂŶĚƉƌŽĐĞĚƵƌĞƐǁŚŝĐŚ^ĐŚůƵŵďĞƌŐĞƌĐĂŶĂƐƐŝƐƚŝŶƐĞůĞĐƚŝŶŐ͘
dŚĞKƉĞƌĂƚŽƌŚĂƐƐƵƉĞƌŝŽƌŬŶŽǁůĞĚŐĞŽĨƚŚĞǁĞůů͕ƚŚĞƌĞƐĞƌǀŽŝƌ͕ƚŚĞĨŝĞůĚĂŶĚĐŽŶĚŝƚŝŽŶƐĂĨĨĞĐƚŝŶŐƚŚĞŵ͘/ĨƚŚĞKƉĞƌĂƚŽƌŝƐĂǁĂƌĞŽĨĂŶLJĐŽŶĚŝƚŝŽŶƐǁŚĞƌĞďLJĂŶĞŝŐŚďŽƌŝŶŐǁĞůůŽƌǁĞůůƐŵŝŐŚƚďĞĂĨĨĞĐƚĞĚďLJƚŚĞƚƌĞĂƚŵĞŶƚ
ƉƌŽƉŽƐĞĚŚĞƌĞŝŶŝƚŝƐƚŚĞKƉĞƌĂƚŽƌΖƐƌĞƐƉŽŶƐŝďŝůŝƚLJƚŽŶŽƚŝĨLJƚŚĞŽǁŶĞƌŽƌŽǁŶĞƌƐŽĨƚŚĞǁĞůůŽƌǁĞůůƐĂĐĐŽƌĚŝŶŐůLJ͘
WƌŝĐĞƐƋƵŽƚĞĚĂƌĞĞƐƚŝŵĂƚĞƐŽŶůLJĂŶĚĂƌĞŐŽŽĚĨŽƌϯϬĚĂLJƐĨƌŽŵƚŚĞĚĂƚĞŽĨŝƐƐƵĞ͘ĐƚƵĂůĐŚĂƌŐĞƐŵĂLJǀĂƌLJĚĞƉĞŶĚŝŶŐƵƉŽŶƚŝŵĞ͕ĞƋƵŝƉŵĞŶƚ͕ĂŶĚŵĂƚĞƌŝĂůƵůƚŝŵĂƚĞůLJƌĞƋƵŝƌĞĚƚŽƉĞƌĨŽƌŵƚŚĞƐĞƐĞƌǀŝĐĞƐ͘
&ƌĞĞĚŽŵĨƌŽŵŝŶĨƌŝŶŐĞŵĞŶƚŽĨƉĂƚĞŶƚƐŽĨ^ĐŚůƵŵďĞƌŐĞƌŽƌŽƚŚĞƌƐŝƐŶŽƚƚŽďĞŝŶĨĞƌƌĞĚ͘
ϮƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
6HFWLRQ:HOOERUH&RQILJXUDWLRQ
ŽƚƚŽŵ,ŽůĞdĞŵƉĞƌĂƚƵƌĞ ϮϬϬĚĞŐ&
ĞǀŝĂƚĞĚ,ŽůĞ EK
dƌĞĂƚŽǁŶ dƵďŝŶŐ
tĞůůdLJƉĞ sĞƌƚŝĐĂů
tĞůů>ŽĐĂƚŝŽŶ KŶ^ŚŽƌĞ
dƵďŝŶŐĂƚĂ
K
;ŝŶͿ
tĞŝŐŚƚ
;ůďͬĨƚͿ
/
;ŝŶͿ
ĞƉƚŚ
;ĨƚͿ
ϱ͘ϱϭϳϰ͘ϴϵϮϳϬϬϬ
ϯ͘ϱϬϬϵ͘ϮϮ͘ϵϵϬϴϮϴϱ
WĞƌĨŽƌĂƚŝŽŶĂƚĂʹ^ƚĂŐĞϭ
dŽƉ
D
;ĨƚͿ
dŽƉ
ds
;ĨƚͿ
ŽƚƚŽŵ
D
;ĨƚͿ
ŽƚƚŽŵ
ds
;ĨƚͿ
^ŚŽƚ
ĞŶƐŝƚLJ
;ƐŚŽƚͬĨƚͿ
EƵŵďĞƌ
ŝĂŵĞƚĞƌ
;ŝŶͿ
ϴϬϳϬϴϬϳϬϴϬϴϬϴϬϴϬϲ͘ϬϬϲϬ͘Ϯϴ
WĞƌĨŽƌĂƚŝŽŶĂƚĂʹ^ƚĂŐĞϮ
dŽƉ
D
;ĨƚͿ
dŽƉ
ds
;ĨƚͿ
ŽƚƚŽŵ
D
;ĨƚͿ
ŽƚƚŽŵ
ds
;ĨƚͿ
^ŚŽƚ
ĞŶƐŝƚLJ
;ƐŚŽƚͬĨƚͿ
EƵŵďĞƌ
ŝĂŵĞƚĞƌ
;ŝŶͿ
ϳϳϳϬϳϳϳϬϳϳϴϬϳϳϴϬϲ͘ϬϬϲϬ͘Ϯϴ
WĞƌĨŽƌĂƚŝŽŶĂƚĂʹ^ƚĂŐĞϯ
dŽƉ
D
;ĨƚͿ
dŽƉ
ds
;ĨƚͿ
ŽƚƚŽŵ
D
;ĨƚͿ
ŽƚƚŽŵ
ds
;ĨƚͿ
^ŚŽƚ
ĞŶƐŝƚLJ
;ƐŚŽƚͬĨƚͿ
EƵŵďĞƌ
ŝĂŵĞƚĞƌ
;ŝŶͿ
ϳϱϵϬϳϱϵϬϳϲϬϬϳϲϬϬϲ͘ϬϬϲϬ͘Ϯϴ
ϯƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
^ĞĐƚŝŽŶϮ͗WƌŽƉƉĞĚ&ƌĂĐƚƵƌĞ^ĐŚĞĚƵůĞʹ^ƚĂŐĞϭ
ϰƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
WƵŵƉŝŶŐ^ĐŚĞĚƵůĞ
dŚĞĨŽůůŽǁŝŶŐŝƐƚŚĞWƵŵƉŝŶŐ^ĐŚĞĚƵůĞƚŽĂĐŚŝĞǀĞĂƉƌŽƉƉĞĚĨƌĂĐ ƚƵƌĞŚĂůĨͲůĞŶŐƚŚ;y Ĩ ͿŐƌĞĂƚĞƌƚŚĂŶϮϬϬĨƚ
:ŽďĞƐĐƌŝƉƚŝŽŶ
^ƚĞƉ
EĂŵĞ
WƵŵƉ
ZĂƚĞ
;ďďůͬŵŝŶͿ
&ůƵŝĚEĂŵĞ
^ƚĞƉůĞĂŶ
&ůƵŝĚ
sŽůƵŵĞ
;ŐĂůͿ
'Ğů
ŽŶĐ͘
;ůďͬŵŐĂůͿ
WƌŽƉ͘
dLJƉĞĂŶĚDĞƐŚ
WƌŽƉ͘
ŽŶĐ͘
;WWͿ
/RDG+ROH%U:)
,6,3:)
)(7:)
,6,3:)
3$':)
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϮϬͬϰϬĂƌďŽ
33$<))OH['ϮϬͬϰϬĂƌďŽ
)/86+:)
)UHH]H3URWHF)UHH]H3URWHFW
WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚŝƐƉƵŵƉŝŶŐƐĐŚĞĚƵůĞŝƐƵŶĚĞƌͲĚŝƐƉůĂĐĞĚďLJϱ͘Ϭďďů͘
&ůƵŝĚdŽƚĂůƐ
ϮϭϰϮďďůŽĨt&ϭϭϬ
ϭϯϮϬďďůŽĨz&ϭϭϱ&ůĞdž
WƌŽƉƉĂŶƚdŽƚĂůƐ
ϮϬϬ͕ϬϬϬůďŽĨϰϬͬϳϬ^ĂŶĚ
ϭϬϬ͕ϬϬϬůďKĨϮϬͬϰϬͲ>ŝƚĞ
WĂĚWĞƌĐĞŶƚĂŐĞƐ
йWůĞĂŶϭϵ͘ϰ
йWŝƌƚLJϭϳ͘ϱ
ϱƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
^ƚĂŐĞϭ
/ŶŝƚŝĂů&ƌĂĐƚƵƌĞdŽƉds͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϴϬϲϴ͘ϬĨƚ
/ŶŝƚŝĂů&ƌĂĐƚƵƌĞŽƚƚŽŵds͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϴϬϴϭ͘ϬĨƚ
WƌŽƉƉĞĚ&ƌĂĐƚƵƌĞ,ĂůĨͲ>ĞŶŐƚŚ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϴϱϴ͘ϵĨƚ
WƌŽƉƉĞĚtŝĚƚŚĂƚtĞůů͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘Ϭ͘ϬϭϱŝŶ
ǀĞƌĂŐĞWƌŽƉƉĞĚtŝĚƚŚ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘Ϭ͘ϬϮϵϯŝŶ
ǀĞƌĂŐĞ'ĞůŽŶĐĞŶƚƌĂƚŝŽŶ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϱϳϭ͘ϳůďͬŵŐĂů
ǀĞƌĂŐĞ&ůƵŝĚZĞƚĂŝŶĞĚ&ĂĐƚŽƌ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘Ϭ͘ϲϬ
K:,LJĚƌĂƵůŝĐ,ĞŝŐŚƚĂƚtĞůů͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϳϱ͘ϯĨƚ
K:EĞƚWƌĞƐƐƵƌĞ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϮϰϵϳƉƐŝ
ĨĨŝĐŝĞŶĐLJ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘Ϭ͘ϰϬϰ
ĨĨĞĐƚŝǀĞŽŶĚƵĐƚŝǀŝƚLJ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϮϲϲϵŵĚ͘Ĩƚ
ĨĨĞĐƚŝǀĞ&ĐĚ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϯ͘ϭ
DĂdž^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϱϳϬϰƉƐŝ
Figure 1. Conductivity Plots
Proppant Concentration
33$
33$
33$
33$
33$
!33$
/HQJWKIW
Fracture Width
Frac#1 MD = 9412.55ft
:LGWKLQ
Lithology and Stress
6WUHVVSVL
Sat. and Young's Modulus
:HOO'HSWK79'IW
<RXQJ
V0RGSVL
[[[[[
DĂdž^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ϱϳϬϰƉƐŝ
ϵƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
^ĞĐƚŝŽŶϯ͗WƌŽƉƉĞĚ&ƌĂĐƚƵƌĞ^ĐŚĞĚƵůĞʹ^ƚĂŐĞϮ
ϭϬƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
WƵŵƉŝŶŐ^ĐŚĞĚƵůĞ
dŚĞĨŽůůŽǁŝŶŐŝƐƚŚĞWƵŵƉŝŶŐ^ĐŚĞĚƵůĞƚŽĂĐŚŝĞǀĞĂƉƌŽƉƉĞĚĨƌĂĐƚƵƌĞŚĂůĨͲůĞŶŐƚŚ;y Ĩ ͿŐƌĞĂƚĞƌƚŚĂŶϮϬϬĨƚ
:ŽďĞƐĐƌŝƉƚŝŽŶ
^ƚĞƉ
EĂŵĞ
WƵŵƉ
ZĂƚĞ
;ďďůͬŵŝŶͿ
&ůƵŝĚEĂŵĞ
^ƚĞƉůĞĂŶ
&ůƵŝĚ
sŽůƵŵĞ
;ŐĂůͿ
'Ğů
ŽŶĐ͘
;ůďͬŵŐĂůͿ
WƌŽƉ͘
dLJƉĞĂŶĚDĞƐŚ
WƌŽƉ͘
ŽŶĐ͘
;WWͿ
/RDG+ROH%U:)
,6,3:)
)(7:)
,6,3:)
3$':)
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϮϬͬϰϬĂƌďŽ
33$<))OH['ϮϬͬϰϬĂƌďŽ
)/86+:)
)UHH]H3URWHF)UHH]H3URWHFW
WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚŝƐƉƵŵƉŝŶŐƐĐŚĞĚƵůĞŝƐƵŶĚĞƌͲĚŝƐƉůĂĐĞĚďLJϱ͘Ϭďďů͘
&ůƵŝĚdŽƚĂůƐ
ϭϳϳϯďďůŽĨt&ϭϭϬ
ϴϬϮďďůŽĨz&ϭϭϱ&ůĞdž
WƌŽƉƉĂŶƚdŽƚĂůƐ
ϭϮϱ͕ϬϬϬůďŽĨϰϬͬϳϬ^ĂŶĚ
ϳϱ͕ϬϬϬůďKĨϮϬͬϰϬͲ>ŝƚĞ
WĂĚWĞƌĐĞŶƚĂŐĞƐ
йWůĞĂŶϭϵ͘ϳ
йWŝƌƚLJϭϳ͘ϴ
ϭϭƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
^ƚĂŐĞϮ
,QLWLDO)UDFWXUH7RS79'IW
,QLWLDO)UDFWXUH%RWWRP79'IW
3URSSHG)UDFWXUH+DOI/HQJWKIW
3URSSHG:LGWKDW:HOOLQ
$YHUDJH3URSSHG:LGWKLQ
$YHUDJH*HO&RQFHQWUDWLRQOEPJDO
$YHUDJH)OXLG5HWDLQHG)DFWRU
(2-+\GUDXOLF+HLJKWDW:HOOIW
(2-1HW3UHVVXUHSVL
(IILFLHQF\
(IIHFWLYH&RQGXFWLYLW\PGIW
(IIHFWLYH)FG
0D[6XUIDFH3UHVVXUHSVL
Figure 5. Stage 2 Conductivity Plot
Proppant Concentration
33$
33$
33$
33$
33$
!33$
/HQJWKIW
Fracture Width
:LGWKLQ
Lithology and Stress
6WUHVVSVL
Sat. and Young's Modulus
:HOO'HSWK79'IW
<RXQJ
V0RGSVL
[[[[[[
0D[6XUIDFH3UHVVXUHSVL
ϭϱƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
^ĞĐƚŝŽŶϯ͗WƌŽƉƉĞĚ&ƌĂĐƚƵƌĞ^ĐŚĞĚƵůĞʹ^ƚĂŐĞϯ
ϭϲƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
WƵŵƉŝŶŐ^ĐŚĞĚƵůĞ
dŚĞĨŽůůŽǁŝŶŐŝƐƚŚĞWƵŵƉŝŶŐ^ĐŚĞĚƵůĞƚŽĂĐŚŝĞǀĞĂƉƌŽƉƉĞĚĨƌĂĐƚƵƌĞŚĂůĨͲůĞŶŐƚŚ;y Ĩ ͿŐƌĞĂƚĞƌƚŚĂŶϮϬϬĨƚ
:ŽďĞƐĐƌŝƉƚŝŽŶ
^ƚĞƉ
EĂŵĞ
WƵŵƉ
ZĂƚĞ
;ďďůͬŵŝŶͿ
&ůƵŝĚEĂŵĞ
^ƚĞƉůĞĂŶ
&ůƵŝĚ
sŽůƵŵĞ
;ŐĂůͿ
'Ğů
ŽŶĐ͘
;ůďͬŵŐĂůͿ
WƌŽƉ͘
dLJƉĞĂŶĚDĞƐŚ
WƌŽƉ͘
ŽŶĐ͘
;WWͿ
/RDG+ROH%U:)
,6,3:)
)(7:)
,6,3:)
3$':)
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$:)ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϰϬͬϳϬ^ĂŶĚ
33$<))OH['ϮϬͬϰϬĂƌďŽ
33$<))OH['ϮϬͬϰϬĂƌďŽ
)/86+:)
)UHH]H3URWHF)UHH]H3URWHFW
WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚŝƐƉƵŵƉŝŶŐƐĐŚĞĚƵůĞŝƐƵŶĚĞƌͲĚŝƐƉůĂĐĞĚďLJϱ͘Ϭďďů͘
&ůƵŝĚdŽƚĂůƐ
ϮϬϱϳďďůŽĨt&ϭϭϬ
ϭϬϰϬďďůŽĨz&ϭϭϱ&ůĞdž
WƌŽƉƉĂŶƚdŽƚĂůƐ
ϭϳϱ͕ϬϬϬůďŽĨϰϬͬϳϬ^ĂŶĚ
ϳϱ͕ϬϬϬůďKĨϮϬͬϰϬͲ>ŝƚĞ
WĂĚWĞƌĐĞŶƚĂŐĞƐ
йWůĞĂŶϭϵ͘ϳ
йWŝƌƚLJϭϳ͘ϴ
ϭϳƚƚĂĐŚŵĞŶƚ'
ůŝĞŶƚ ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
tĞůů ͗ dŚĞƚĂtĞƐƚ
&ŽƌŵĂƚŝŽŶ͗ &&
ŝƐƚƌŝĐƚ ͗ WƌƵĚŚŽĞĂLJ͕ůĂƐŬĂ
6FKOXPEHUJHU3ULYDWH^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
^ƚĂŐĞϯ
,QLWLDO)UDFWXUH7RS79'IW
,QLWLDO)UDFWXUH%RWWRP79'IW
3URSSHG)UDFWXUH+DOI/HQJWKIW
3URSSHG:LGWKDW:HOOLQ
$YHUDJH3URSSHG:LGWKLQ
$YHUDJH*HO&RQFHQWUDWLRQOEPJDO
$YHUDJH)OXLG5HWDLQHG)DFWRU
(2-+\GUDXOLF+HLJKWDW:HOOIW
(2-1HW3UHVVXUHSVL
(IILFLHQF\
(IIHFWLYH&RQGXFWLYLW\PGIW
(IIHFWLYH)FG
0D[6XUIDFH3UHVVXUHSVL
Figure 9. Stage 2 Conductivity Plot
Proppant Concentration
33$
33$
33$
33$
33$
!33$
/HQJWKIW
Fracture Width
:LGWKLQ
Lithology and Stress
6WUHVVSVL
Sat. and Young's Modulus
:HOO'HSWK79'IW
<RXQJ
V0RGSVL
[[[[[
0D[6XUIDFH3UHVVXUHSVL
6(&7,21
:(//+($'35(6685(
&21752/6&+(0$7,&
'21276&$/(685)$&(75($70(17
0$7(5,$/ +($775($7
'5$:1%<
&+(&.('%<
$33529('%<
(67,0$7('
:(,*+7
,1,7,$/86(%0
'$7(
'$7(
'$7(
6+((7 5(9
,19(1725'
CAMERON
0.5(-&,
0.5(-&,
0.5(-&,
)HE
)HE
)HE
/%6
.*6'2)6'
685)$&(
6<67(06$6FKOXPEHUJHU&RPSDQ\
&21),'(17,$/
*5($7%($53$17+(21
.0%667$1'$5'&203/(7,21
&6*;;;
&21'8&725
&$6,1*
&$6,1*
78%,1*
.%;
.%;
.
%;
:(&2
.
%;
:(&2
.
%;
:(&2
.$3,%;
.$3,
%;
7232)&21'8&725
>@
>@
>@
>@
.
%;
:(&2
6(&7,21
&+(0,&$/',6&/2685(
)UDF)RFXV
7UDGH1DPH 6XSSOLHU 3XUSRVH ,QJUHGLHQWV &$61XPEHU
0D[LPXP
,QJUHGLHQW
&RQFHQWUDWLR
QLQ$GGLWLYH
E\
PDVV
0D[LPXP
,QJUHGLHQW
&RQFHQWUDWLR
QLQ+))OXLG
E\
PDVV
&RPPHQWV
<))OH[':)
<))OH['
:):DWHU
+&O
6FKOXPEHUJHU 6XUIDFWDQW%UHDNHU
%UHDNHU-*HO-
&URVVOLQNHU-&OD\
&RQWURO$JHQW$GGLWLYH
%DFWHULFLGH,QKLELWRU$LG
&RUURVLRQ,QKLELWRU$$
$FLG,URQ&RQWURO$JHQW
/'HPXOVLILHU
3URSSLQJ$JHQW
:DWHU,QFOXGLQJ0L[:DWHU
6XSSOLHGE\&OLHQW
&$61RW
$VVLJQHG
&HUDPLFPDWHULDOVDQG
ZDUHVFKHPLFDOV
+\GURFKORULFDFLG
*XDUJXP
K\GUR[\111
WULPHWK\OHWKDQDPLQLXP
FKORULGH
8OH[LWH
(WK\OHQH*O\FRO
'LDPPRQLXP
SHUR[RGLVXOSKDWH
)RUPLFDFLG
6RGLXP7HWUDERUDWH
'HFDK\GUDWH
9LQ\OLGHQH
FKORULGHPHWK\ODFU\ODWH
FRSRO\PHU
3523$12/
EXWR[\HWKDQRO
(WKR[\ODWHG&$OFRKRO
6RGLXPK\GUR[LGH
0HWKDQRO
(WKR[\ODWHG$OFRKRO
EXWHQHGLRLFDFLG
'LDWRPDFHRXVHDUWK
FDOFLQHG
6RGLXPHU\WKRUEDWH
/DFWRVH
5HDFWLRQSURGXFWRI
DFHWRSKHQRQH
IRUPDOGHK\GH
F\FORKH[\ODPLQHPHWKDQRO
DQGDFHWLFDFLG
8QGHFDQRO
0DJQHVLXPQLWUDWH
&LQQDPDOGHK\GH
2[LUDQH0HWK\OSRO\PHU
ZLWK2[LUDQH
1RQFU\VWDOOLQHVLOLFD
LPSXULW\
$OFRKRO&&
(WKR[\ODWHG
0DJQHVLXPVLOLFDWHK\GUDWH
WDOF
(WKR[\ODWHGSURSR[\ODWHG
QRQ\OSKHQROIRUPDOGHK\GH
UHVLQ
$OFRKROV&LVR&ULFK
HWKR[\ODWHG
7RWDO:DWHU9ROXPHJDO
+\GUDXOLF)UDFWXULQJ)OXLG&RPSRVLWLRQ
7KHWUDGHQDPHVRIWKHDGGLWLYHVXVHGVXSSOLHUVDQGWKHSXUSRVHVRIWKHDGGLWLYHVDUHOLVWHGDERYH7KHLQJUHGLHQWVIRUWKHDERYHDGGLWLYHVDUHOLVWHG
EHORZ
/RQJ/DW3URMHFWLRQ
3URGXFWLRQ7\SH
7UXH9HUWLFDO'HSWK79'
:HOO1DPH 1XPEHU 7KHWD:HVW
/RQJLWXGH
/DWLWXGH
&RXQW\3DULVK 1RUWK6ORSH%RURXJK
$3,1XPEHU
2SHUDWRU1DPH *UHDW%HDU3DQWKHRQ//&
+\GUDXOLF)UDFWXULQJ)OXLG3URGXFW&RPSRQHQW,QIRUPDWLRQ'LVFORVXUH
)UDFWXUH'DWH 0DU
6WDWH $ODVND
WĂŐĞ͗ϭͬϮη^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
7UDGH1DPH 6XSSOLHU 3XUSRVH ,QJUHGLHQWV &$61XPEHU
0D[LPXP
,QJUHGLHQW
&RQFHQWUDWLR
QLQ$GGLWLYH
E\
PDVV
0D[LPXP
,QJUHGLHQW
&RQFHQWUDWLR
QLQ+))OXLG
E\
PDVV
&RPPHQWV
7KHWUDGHQDPHVRIWKHDGGLWLYHVXVHGVXSSOLHUVDQGWKHSXUSRVHVRIWKHDGGLWLYHVDUHOLVWHGDERYH7KHLQJUHGLHQWVIRUWKHDERYHDGGLWLYHVDUHOLVWHG
EHORZ
FKORURPHWK\O
LVRWKLD]ROLQRQHDQG
PHWK\OLVRWKLD]ROLQRQH
$OFRKROV&LVR&
ULFKHWKR[\ODWHG
0DJQHVLXPFKORULGH
$OFRKROV&
HWKR[\ODWHG
$OFRKRO&
HWKR[\ODWHG
'LXWDQJXP
3RO\WHWUDIOXRURHWK\OHQH
3RO\R[\HWKDQHGL\OD
K\GURZK\GUR[\(WKDQH
GLROHWKR[\ODWHG
$FHWLFDFLGLPSXULW\
$FHWRSKHQRQH
$PLQHVWDOORZDON\O
HWKR[\ODWHG
11'LPHWK\O1GRGHF\O
EHQ]\ODPLQLXPFKORULGH
6ROYHQWQDSKWKD
SHWUROHXPKHDY\DURP
)RUPDOGHK\GHLPSXULW\
4XDUW]&U\VWDOOLQHVLOLFD
&ULVWREDOLWH
3URSHQDPLQLXP11
GLPHWK\O1SURSHQ\O
FKORULGHKRPRSRO\PHU
$FHWLFDFLGSRWDVVLXPVDOW
%HQ]HQHPHWKDQDPLQLXP
11GLPHWK\O1WHWUDGHF\O
FKORULGH
0DOWRGH[WULQ
1DSKWKDOHQH,PSXULW\
3RWDVVLXPROHDWH
%HQ]HQHPHWKDQDPLQLXP1
KH[DGHF\O11GLPHWK\O
FKORULGH
7ULPHWK\OEHQ]HQH
LPSXULW\
'H[WULQ
+HPLFHOOXODVHHQ]\PH
7RWDO:DWHU9ROXPHVRXUFHVPD\LQFOXGHIUHVKZDWHUSURGXFHGZDWHUDQGRUUHF\FOHGZDWHU
,QIRUPDWLRQLVEDVHGRQWKHPD[LPXPSRWHQWLDOIRUFRQFHQWUDWLRQDQGWKXVWKHWRWDOPD\EHRYHU
5HSRUW,'537*HQHUDWHGRQ30
$OOFRPSRQHQWLQIRUPDWLRQOLVWHGZDVREWDLQHGIURPWKHVXSSOLHU¶V6DIHW\'DWD6KHHWV6'6$VVXFKWKH2SHUDWRULVQRWUHVSRQVLEOHIRULQDFFXUDWHDQGRU
LQFRPSOHWHLQIRUPDWLRQ$Q\TXHVWLRQVUHJDUGLQJWKHFRQWHQWRIWKH6'6VKRXOGEHGLUHFWHGWRWKHVXSSOLHUZKRSURYLGHGLW7KH2FFXSDWLRQDO6DIHW\DQG+HDOWK
$GPLQLVWUDWLRQ¶V26+$UHJXODWLRQVJRYHUQWKHFULWHULDIRUWKHGLVFORVXUHRIWKLVLQIRUPDWLRQ3OHDVHQRWHWKDW)HGHUDO/DZSURWHFWVSURSULHWDU\WUDGHVHFUHW
DQGFRQILGHQWLDOEXVLQHVVLQIRUPDWLRQDQGWKHFULWHULDIRUKRZWKLVLQIRUPDWLRQLVUHSRUWHGRQDQ6'6LVVXEMHFWWR&)5LDQG$SSHQGL['
7KHHYDOXDWLRQRIDWWDFKHGGRFXPHQWLVSHUIRUPHGEDVHGRQWKHFRPSRVLWLRQRIWKHLGHQWLILHGSURGXFWVWRWKHH[WHQWWKDWVXFKFRPSRVLWLRQDOLQIRUPDWLRQZDV
NQRZQWR*5&&KHPLFDOVDVRIWKHGDWHRIWKHGRFXPHQWZDVSURGXFHG$Q\QHZXSGDWHVZLOOQRWEHUHIOHFWHGLQWKLVGRFXPHQW
3URSULHWDU\7HFKQRORJ\
WĂŐĞ͗ϮͬϮη^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
6(&7,21
:(//3/$7
320 1000500250Feet16 Nov 2021Joe Alston-1 of 1-Great Bear PANTHEONTheta West #1Permit to DrillSECTION 32, T7N, R11EUMIAT MERIDIANNAD 83Alaska State Plane Zone 45007501000Scale31335293028643000 FTF.E.L.4860 FTF.N.L.Theta West #1Inline: 1441XLine: 1105
6(&7,21
',5(&7,21$/
6859(<:(//3/$1
6FKOXPEHUJHU
7KHWD:HVW6XUYH\*HRGHWLF5HSRUW1$''HI6XUYH\&RPPHQWV0'IW,QFO$]LP7UXH79'66IW79'IW96(&IW$+'IW&ORVXUHIW16IW(:IW'/6IW1RUWKLQJIW86(DVWLQJIW86/DWLWXGH/RQJLWXGH57( 1$ 9-5/8" Csg3030.000.36 223.25 2789.92 3029.92 2.84 19.63 16.65 2.84 -16.400.26 5817640.44 569844.76 69.91211494 -149.44480635 7RWDO*UDYLW\)LHOG6WUHQJWKPJQ%DVHG7RWDO&RUU0DJ1RUWK!7UXH1RUWK*UDYLW\0RGHOQ7'2;7RWDO0DJQHWLF)LHOG6WUHQJWK0DJQHWLF'LS$QJOH1RUWK5HIHUHQFH)HEUXDU\%**07UXH1RUWK*ULG&RQYHUJHQFH8VHGIWDERYH06/79'5HIHUHQFH(OHYDWLRQ*URXQG(OHYDWLRQIWDERYH06/)LHOG5HSRUW'DWH166RXWK([SORUDWLRQ&OLHQW*UHDW%HDU)HEUXDU\300LQLPXP&XUYDWXUH/XELQVNL7UXH1RUWKIWIW5RWDU\7DEOH6XUYH\'/6&RPSXWDWLRQ79'5HIHUHQFH'DWXP9HUWLFDO6HFWLRQ$]LPXWK9HUWLFDO6HFWLRQ2ULJLQ$3,7KHWD:HVW6WUXFWXUH6ORW:HOO%RUHKROH7KHWD:HVW7KHWD:HVW7:/RFDWLRQ*ULG1(<;1$'$ODVND6WDWH3ODQH=RQH86)HHWIW&RRUGLQDWH5HIHUHQFH6\VWHP6XUYH\1DPH7KHWD:HVW6XUYH\'DWH*ULG6FDOH)DFWRU9HUVLRQ3DWFK:HOO+HDG/RFDO&RRUG5HIHUHQFHG7R0DJQHWLF'HFOLQDWLRQ'HFOLQDWLRQ'DWH0DJQHWLF'HFOLQDWLRQ0RGHO1
:
7RUW$+''',(5'5DWLR&56*ULG&RQYHUJHQFH$QJOH)HEUXDU\/RFDWLRQ/DW/RQJ1IW86(IW86'ULOOLQJ2IILFH 166RXWK([SORUDWLRQ?7KHWD:HVW?7KHWD:HVW?7KHWD:HVW?7KHWD:HVW 303DJHRI
&RPPHQWV0'IW,QFO$]LP7UXH79'66IW79'IW96(&IW$+'IW&ORVXUHIW16IW(:IW'/6IW1RUWKLQJIW86(DVWLQJIW86/DWLWXGH/RQJLWXGH 3DUW0')URPIW0'7RIW(28)UHTIW+ROH6L]HLQ&DVLQJ'LDPHWHULQ $FW6WQV $FW6WQV $FW6WQV $FW6WQV 6XUIDFH)6/)(/6715(80 %+/)6/)(/715(80 6/%B%/,1'75(1' 7KHWD:HVW7KHWD:HVW/HJDO'HVFULSWLRQ1RUWKLQJ< (DVWLQJ;6/%B0:'67' 7KHWD:HVW7KHWD:HVW6/%B0:'67' 7KHWD:HVW7KHWD:HVW6/%B0:',1&B21/< 7KHWD:HVW7KHWD:HVW'HVFULSWLRQ6XUYH\7RRO7\SH %RUHKROH6XUYH\6XUYH\(UURU0RGHO,6&:6$5HY
'&RQILGHQFHVLJPD6XUYH\3URJUDP'ULOOLQJ2IILFH 166RXWK([SORUDWLRQ?7KHWD:HVW?7KHWD:HVW?7KHWD:HVW?7KHWD:HVW 303DJHRI
6(&7,21
*HRORJ\2YHUYLHZ
$UFWLF%OYG6XLWH
$QFKRUDJH$.
7KHWD:HVW%DVLQ)ORRU)DQ
&DPSDQLDQ%DVLQ)ORRU)DQLQWHUYDOIURPLQWHUYDOIURP¶±¶0'
*HRORJLFDOGHVFULSWLRQRIWKH&DPSDQLDQ%DVLQ)ORRU)DQUHVHUYRLUVHFWLRQRIWKH7KHWD:HVWZHOO
7KHUHJLRQDOEDVLQIORRUIDQWRSVHDO+XH6KDOHDSSUR[LPDWHO\¶WKLFNH[WHQGVFRQWLQXRXVO\DFURVVWKH
HQWLUHEDVLQIORRUIDQDUHDDVD'VHLVPLFDOO\PDSSDEOHFRQWLQXRXVHYHQWRYHUWKHWRSRIWKH%DVLQ)ORRU
)DQUHVHUYRLU
7KH%DVLQ)ORRU)DQUHVHUYRLUWDUJHWOLHVEHWZHHQ¶¶0'LQPDLQGHSRVLWLRQDOF\FOHV(DFK
F\FOHUHSUHVHQWLQJDPDMRUEDVLQIORRUIDQGHSRVLWLRQDOHSLVRGH
7KHVXUIDFHFDVLQJSRLQWLVDW¶0'7KH.'HFNHU'UHJLRQDO&DPSDQLDQDJHIRRGHYHQWVKDOHV
FRYHUWKHHQWLUHSURMHFWDUHDFRQWLQXRXVIURPHDVWRI7DOLWKDWRZHVWRIWKH7KHWD:HVWZHOOORFDWLRQ
7KH%DVLQ)ORRU)DQUHVHUYRLUVHFWLRQLVDVXFFHVVLRQRIVWDFNHGPLGGOHWRRXWHUIDQOREHVFRQVLVWLQJRI
IHHGHUFKDQQHOOHYHHDQGLQWHUFKDQQHORYHUEDQNIDFLHV7KHUHVHUYRLUIDFLHVV\VWHPDVVHHQLQ7KHWD:HVW
DQGLQWHUSUHWHGIURP'VHLVPLFDUHOLNHO\ODWHUDOO\FRQQHFWHGDPDOJDPDWHGPXOWLODWHUDOOREHVWKDWIRUP
DVORSHDSURQRQODSWRWKHZHVWDQGWKLQEDVLQZDUGLQWRGLVWDOEDVLQSODLQVSOD\V
3705 Arctic Blvd, Suite 2324
Anchorage, AK 99503
1
,*!#$.!& !'%%*!$!*'**,*&, '& *0(*'.!+
, '$$'/!& +,,%&, !& +-(('*, ' , -&*0 *%!, (($!,!'& !$ -&*
', +,'%0#&'/$,*!&)-!*0&*+* , '$$'/!&+,,%&,+*
,*-
, *, &, ,,'
$+#, **&''/&*+$&'/&*++-*'/&*+'*'(*,'*+
$',/!, !&'& $%!$', $!,
/$$
,,'
$+# +*!.&',!', +-",
(($!,!'&'*-&*0*%!,+/$$+
&',!, ,-('&*)-+,, '%($,(($!,!'&!+.!$$*'%*,*&, '&
+/*&!*%, ,, '.+,,%&,+*'**,
,
,*!#$.!&
3/10/2022
$PDQGD0F&DOHE
)URP(GZDUG'XQFDQ(G#GXQFDQSHWURFRP!
6HQW7KXUVGD\0DUFK30
7R$PDQGD0F&DOHE0LFKDHO'XQFDQ
&FEREURVHQWKDO#PHFRP5REHUW5RVHQWKDO
6XEMHFW):7KHWD:HVW37'6XQGU\$SSOLFDWLRQWR)UDF5HTXHVWV
>ĞƚŵĞŬŶŽǁŝĨLJŽƵŶĞĞĚŵŽƌĞʹƐĞĞŵLJƌĞƐƉŽŶƐĞŝŶƌĞĚďĞůŽǁ͘
Ě
ĚƵŶĐĂŶ
ƵŶĐĂŶWĞƚƌŽůĞƵŵĚǀŝƐŽƌƐ>>
ƵƐƚŝŶ͕dĞdžĂƐ
ϱϭϮͲϵϱϲͲϭϱϱϵ
&ƌŽŵ͗ŵĂŶĚĂDĐĂůĞďфĂŵĐĐĂůĞďΛƉĂŶƚŚĞŽŶƌĞƐŽƵƌĐĞƐ͘ĐŽŵх
^ĞŶƚ͗dŚƵƌƐĚĂLJ͕DĂƌĐŚϭϬ͕ϮϬϮϮϭϮ͗ϬϰWD
dŽ͗ĚǁĂƌĚƵŶĐĂŶфĚΛĚƵŶĐĂŶƉĞƚƌŽ͘ĐŽŵх
^ƵďũĞĐƚ͗&t͗dŚĞƚĂtĞƐƚηϭ;WdϮϮϭͲϭϬϲ͖^ƵŶĚƌLJϯϮϮͲϭϭϯͿƉƉůŝĐĂƚŝŽŶƚŽ&ƌĂĐͲZĞƋƵĞƐƚƐ
Ě͗
'ŽŽĚĨƚĞƌŶŽŽŶ͘tĞŚĂǀĞĂŶŽƚŚĞƌƌĞƋƵĞƐƚĨƌŽŵƚŚĞK'ĨŽƌĂĚĚŝƚŝŽŶĂůĚŽĐƵŵĞŶƚĂƚŝŽŶƚŽĐŽŵƉůĞƚĞƚŚĞŽŵƉůĞƚŝŽŶ
^ƵŶĚƌLJĨŽƌdt͘/ƉĂƐƐĞĚƚŚŝƐŝŶƋƵŝƌLJƚŽZĂLJDŝůůĞƌĂŶĚŚĞĂƐŬĞĚŵĞƚŽĨŽůůŽǁƵƉǁŝƚŚLJŽƵƌĞŐĂƌĚŝŶŐƚŚĞŚŝŐŚůŝŐŚƚĞĚ
ŝƚĞŵƐ͘
,QDGGLWLRQWRP\UHTXHVWIRUZHOODQGPXGORJJLQJLQIRUPDWLRQEHORZWKHIROORZLQJLQIRUPDWLRQLVDOVRQHHGHGWRFRPSOHWHWKH
JHRORJLFDOUHYLHZIRU*UHDW%HDU¶V6XQGU\$SSOLFDWLRQWRIUDF7KHWD:HVW
x$$&D$IILGDYLWQRQHUHFHLYHG
xD)UHVKZDWHUDTXLIHUVJHRORJLFDOQDPHPHDVXUHGDQGWUXHYHUWLFDOGHSWK,Q*UHDW%HDUFRQWUDFWHG
+'5WRSHUIRUPDUHJLRQDODTXLIHUVWXG\WKDWLQFOXGHVWKHHDVWHUQSRUWLRQRIWKH7KHWD:HVW)DQ
FRPSOH[+'5GHWHUPLQHGWKDWIURPEDVH3HUPDIURVWDSSUR[LPDWHO\¶0'WRWKHWRS&DQQLQJ)RUPDWLRQ
DSSUR[LPDWHO\¶0'SRWHQWLDODTXLIHUVZHUHEUDFNLVKLQQDWXUH7KLVZRXOGLQFOXGHWKHVDQGVWRQHVRIWKH
3ULQFH&UHHN6DJDYDQLUNWRNDQG8SSHU6FKUDGHU%OXII)RUPDWLRQVWKDWOLHDERYHWKH&DQQLQJUHJLRQDOWRS
VHDO
xD$&DVLQJFHPHQWHGEHORZORZHUPRVWIUHVKZDWHUDTXLIHUDQGFRQIRUPVWR$$&
xD%(DFKK\GURFDUERQ]RQHLVLVRODWHG
xD%*HRORJLFDOQDPHRIHDFK]RQHIRUIUDFWXULQJLQWHUYDOV7KHWD:HVWZLOOIUDFVDQGVWKDWOLHZLWKLQWKH&DQQLQJ
)RUPDWLRQ,QWHUQDOO\ZHKDYHLGHQWLILHGWKHVHVDQGVDVSDUWRID&DPSDQLDQDJHEDVLQIORRUIDQFRPSOH[WKDWOLHVEHORZ
WKHUHJLRQDOO\PDSSDEOH+XH6KDOHDQGDERYHWKH+5=*5=VKDOH
xD)DXOWVDQGIUDFWXUHV/RFDWLRQRULHQWDWLRQ+DYHDQ\EHHQLGHQWLILHGLQWKHZHOOERUHRURQVHLVPLFGDWD"2XU
WHFKQLFDOWHDPKDVQRWLGHQWLILHGDQ\IDXOWVRUIUDFWXUHVWKDWLQWHUVHFWWKH7KHWD:HVWZHOORUDQ\WKDWRFFXUZLWKLQòPLOHRI
WKHERUHKROH2XULQWHUSUHWDWLRQLVFRQVLVWHQWZLWKWKHLQGHSHQGHQWSUHGULOOVKDOORZKD]DUGVUHSRUWFRPSOHWHGE\35$
xD)DXOWVDQGIUDFWXUHV6XIILFLHQWLQIRUPDWLRQWRGHWHUPLQHQRLQWHUIHUHQFHZLWKFRQWDLQPHQWZLWKLQòPLOH2XU'
GDWDLQGLFDWHVWKHUHDUHQRLGHQWLILDEOHIDXOWVRUIUDFWXUHVZLWKLQòPLOHRIWKHERUHKROH
dŚĂŶŬƐĨŽƌĂŶLJŚĞůƉLJŽƵŵĂLJďĞĂďůĞƚŽƉƌŽǀŝĚĞ͘
zŽƵƌƐƚƌƵůLJ͕
ŵĂŶĚĂ
&ƌŽŵ͗ZĂLJDŝůůĞƌфŵŝůůĞƌƌϱϳΛLJĂŚŽŽ͘ĐŽŵх
^ĞŶƚ͗dŚƵƌƐĚĂLJ͕DĂƌĐŚϭϬ͕ϮϬϮϮϭϭ͗ϱϱD
dŽ͗ŵĂŶĚĂDĐĂůĞďфĂŵĐĐĂůĞďΛƉĂŶƚŚĞŽŶƌĞƐŽƵƌĐĞƐ͘ĐŽŵх
Đ͗'sZфĐŐďĚǀƌΛLJĂŚŽŽ͘ĐŽŵх
^ƵďũĞĐƚ͗ZĞ͗dŚĞƚĂtĞƐƚηϭ;WdϮϮϭͲϭϬϲ͖^ƵŶĚƌLJϯϮϮͲϭϭϯͿƉƉůŝĐĂƚŝŽŶƚŽ&ƌĂĐͲZĞƋƵĞƐƚƐ
+L$PDQGD
,
YHKLJKOLJKWHGVRPHJHRORJLFVHLVPLFLQIRUPDWLRQUHTXHVWVWKDWPD\EHVWEHSDVVHGWR(G'XQFDQLQ0LFKDHO
VDEVHQFH
7KHUHTXHVWVLQFOXGLQJFDVLQJFHPHQWLQJLVRODWLQJYHUELDJHDUHW\SLFDOVXEPLVVLRQVDWWKHHQGRIZHOOE\WKHGULOOLQJJURXS
,
OOSDVVDORQJWR3DXO6PLWK 0DUN%URXLOOHWWRVHHZKDWZHFDQJHWRXUKDQGVRQ
6WLOOZRUNLQJRQZKDWLVPHDQWE\ILHOGJUDGHORJV7KHRQO\LWHPV,KDYHDUHSDUDOOHOFRSLHVRQ7DOLWKDEXWGXHWRWKH
VHSDUDWLRQRIPLOHVQHZUHSRUWVKDYHWREHILOHG
:HKDYHDFRXSOHRIFDOOVLQWKHQH[WKRXUVREXWZH
OONHHSORRNLQJ
5JGV
50
2Q7KXUVGD\0DUFK$0$.67$PDQGD0F&DOHEDPFFDOHE#SDQWKHRQUHVRXUFHVFRP!ZURWH
+H\5D\
:HQHHGWRIROORZXSRQVHYHUDOLWHPVWRFRPSOHWHWKH7:6XQGU\
,KDYHFROOHFWHGWKHIROORZLQJVRIDU
x ±GDLO\UHSRUW
x &HPHQWHYDOXDWLRQGDWHGZDLWLQJRQ0LFKDHOWRVHHLI,VKRXOGLQFOXGHWKLV
x 7KHPRVWUHFHQWPXGORJLQSGIIRUPDOVRLQFOXGHGLQWKDWHPDLOWKDWZDVVHQWIURPWKHPXGORJJHUVWKDW
GD\ZDVD7:B7LPH/$6B)HELQ/$6IRUP
7KH\DUHDVNLQJIRU³ILHOGJUDGHZHOOORJVLQODVIRUPDW³'R\RXNQRZZKDWWKDWPHDQVVSHFLILFDOO\«)LHOGJUDGHZKDW
W\SHRIORJDP,ORRNLQJIRU",UHFHLYHGWKH(2:/RJVDQG'DWDIURP6/%MXVWQRWVXUHZKLFKORJ,QHHGWRSXOORXWIRU
WKLV
,¶PQRWTXLWHVXUHZKDWWRGRZLWKWKHUHPDLQLQJLQIRUPDWLRQWKH\DUHUHTXHVWLQJLW¶VDGHFHQWOLVW6HHEHORZ,DP
VHHNLQJ\RXUJXLGDQFH7KDQNV
<RXUVWUXO\
$PDQGD
)URP0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
6HQW7KXUVGD\0DUFK$0
7R$PDQGD0F&DOHEDPFFDOHE#SDQWKHRQUHVRXUFHVFRP!
6XEMHFW)ZG7KHWD:HVW37'6XQGU\$SSOLFDWLRQWR)UDF5HTXHVWV
&RXOG\RXSOHDVHWDNHDORRN
6HQWIURPP\L3KRQH
%HJLQIRUZDUGHGPHVVDJH
)URP'DYLHV6WHSKHQ)2*&VWHYHGDYLHV#DODVNDJRY!
'DWH0DUFKDW$0+67
7R0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
&F/RHSS9LFWRULD72*&YLFWRULDORHSS#DODVNDJRY!:DOODFH&KULV'2*&
FKULVZDOODFH#DODVNDJRY!
6XEMHFW5(7KHWD:HVW37'6XQGU\$SSOLFDWLRQWR)UDF5HTXHVWV
0LFKDHO
,QDGGLWLRQWRP\UHTXHVWVEHORZ,ZDVDOVRXQDEOHWRILQGWKH7KHWD:HVW'DLO\'ULOOLQJ5HSRUWIRU
-DQXDU\WKDWGHVFULEHVFHPHQWLQJRSHUDWLRQVIRUVXUIDFHFDVLQJ:HUHFHPHQWUHWXUQVVHHQDW
VXUIDFH",IVRZKDWZDVWKHDSSUR[LPDWHYROXPH",IQRWZDVDFHPHQWHYDOXDWLRQWRROUXQ"
7KDQNVDQGVWD\VDIH
6WHYH'DYLHV
$ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ$2*&&
CONFIDENTIALITY NOTICE:7KLVHPDLOPHVVDJHLQFOXGLQJDQ\DWWDFKPHQWVFRQWDLQVLQIRUPDWLRQIURPWKH$ODVND2LO
DQG*DV&RQVHUYDWLRQ&RPPLVVLRQ$2*&&6WDWHRI$ODVNDDQGLVIRUWKHVROHXVHRIWKHLQWHQGHGUHFLSLHQWV,WPD\FRQWDLQ
FRQILGHQWLDODQGRUSULYLOHJHGLQIRUPDWLRQ7KHXQDXWKRUL]HGUHYLHZXVHRUGLVFORVXUHRIVXFKLQIRUPDWLRQPD\YLRODWHVWDWHRU
IHGHUDOODZ,I\RXDUHDQXQLQWHQGHGUHFLSLHQWRIWKLVHPDLOSOHDVHGHOHWHLWZLWKRXWILUVWVDYLQJRUIRUZDUGLQJLWDQGVRWKDWWKH
$2*&&LVDZDUHRIWKHPLVWDNHLQVHQGLQJLWWR\RXFRQWDFW6WHYH'DYLHVDWRUVWHYHGDYLHV#DODVNDJRY
)URP'DYLHV6WHSKHQ)2*&
6HQW:HGQHVGD\0DUFK$0
7R0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
&F/RHSS9LFWRULD72*&YLFWRULDORHSS#DODVNDJRY!:DOODFH&KULV'2*&
FKULVZDOODFH#DODVNDJRY!
6XEMHFW7KHWD:HVW37'6XQGU\$SSOLFDWLRQWR)UDF5HTXHVWV
0LFKDHO
,QDGGLWLRQWRP\UHTXHVWIRUZHOODQGPXGORJJLQJLQIRUPDWLRQEHORZWKHIROORZLQJLQIRUPDWLRQLVDOVR
QHHGHGWRFRPSOHWHWKHJHRORJLFDOUHYLHZIRU*UHDW%HDU¶V6XQGU\$SSOLFDWLRQWRIUDF7KHWD:HVW
x $$&D$IILGDYLWQRQHUHFHLYHG
x D)UHVKZDWHUDTXLIHUVJHRORJLFDOQDPHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
x D$&DVLQJFHPHQWHGEHORZORZHUPRVWIUHVKZDWHUDTXLIHUDQGFRQIRUPVWR$$&
x D%(DFKK\GURFDUERQ]RQHLVLVRODWHG
x D%*HRORJLFDOQDPHRIHDFK]RQHIRUIUDFWXULQJLQWHUYDOV
x D)DXOWVDQGIUDFWXUHV/RFDWLRQRULHQWDWLRQ+DYHDQ\EHHQLGHQWLILHGLQWKHZHOOERUHRU
RQVHLVPLFGDWD"
x D)DXOWVDQGIUDFWXUHV6XIILFLHQWLQIRUPDWLRQWRGHWHUPLQHQRLQWHUIHUHQFHZLWK
FRQWDLQPHQWZLWKLQòPLOH
+DYLQJILHOGJUDGHPXGORJLQIRUPDWLRQLQODVIRUPDWZRXOGDOVREHKHOSIXOEXWLVQRWDVFULWLFDODVKDYLQJ
WKHZHOOORJJLQJGDWDLQODVIRUPDW
7KDQNVDQGVWD\VDIH
6WHYH'DYLHV
$ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ$2*&&
CONFIDENTIALITY NOTICE:7KLVHPDLOPHVVDJHLQFOXGLQJDQ\DWWDFKPHQWVFRQWDLQVLQIRUPDWLRQIURPWKH$ODVND2LO
DQG*DV&RQVHUYDWLRQ&RPPLVVLRQ$2*&&6WDWHRI$ODVNDDQGLVIRUWKHVROHXVHRIWKHLQWHQGHGUHFLSLHQWV,WPD\FRQWDLQ
FRQILGHQWLDODQGRUSULYLOHJHGLQIRUPDWLRQ7KHXQDXWKRUL]HGUHYLHZXVHRUGLVFORVXUHRIVXFKLQIRUPDWLRQPD\YLRODWHVWDWHRU
IHGHUDOODZ,I\RXDUHDQXQLQWHQGHGUHFLSLHQWRIWKLVHPDLOSOHDVHGHOHWHLWZLWKRXWILUVWVDYLQJRUIRUZDUGLQJLWDQGVRWKDWWKH
$2*&&LVDZDUHRIWKHPLVWDNHLQVHQGLQJLWWR\RXFRQWDFW6WHYH'DYLHVDWRUVWHYHGDYLHV#DODVNDJRY
)URP'DYLHV6WHSKHQ)2*&
6HQW:HGQHVGD\0DUFK$0
7R0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
&F/RHSS9LFWRULD72*&YLFWRULDORHSS#DODVNDJRY!
6XEMHFW5(7KHWD:HVW37'&%/
0LFKDHO
&RXOG*UHDW%HDUSOHDVHSURYLGHDFRS\RIWKHPXGORJIRU7KHWD:HVW",WZRXOGDOVREHKHOSIXOIRUP\
UHYLHZRIWKH6XQGU\$SSOLFDWLRQWRIUDFWXUHWKHZHOOLI\RXDOOFRXOGSURYLGHDFRS\RIWKHILHOGJUDGHZHOO
ORJVLQODVIRUPDW
7KDQNVDQGVWD\VDIH
6WHYH'DYLHV
$ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ$2*&&
CONFIDENTIALITY NOTICE:7KLVHPDLOPHVVDJHLQFOXGLQJDQ\DWWDFKPHQWVFRQWDLQVLQIRUPDWLRQIURPWKH$ODVND2LO
DQG*DV&RQVHUYDWLRQ&RPPLVVLRQ$2*&&6WDWHRI$ODVNDDQGLVIRUWKHVROHXVHRIWKHLQWHQGHGUHFLSLHQWV,WPD\FRQWDLQ
FRQILGHQWLDODQGRUSULYLOHJHGLQIRUPDWLRQ7KHXQDXWKRUL]HGUHYLHZXVHRUGLVFORVXUHRIVXFKLQIRUPDWLRQPD\YLRODWHVWDWHRU
IHGHUDOODZ,I\RXDUHDQXQLQWHQGHGUHFLSLHQWRIWKLVHPDLOSOHDVHGHOHWHLWZLWKRXWILUVWVDYLQJRUIRUZDUGLQJLWDQGVRWKDWWKH
$2*&&LVDZDUHRIWKHPLVWDNHLQVHQGLQJLWWR\RXFRQWDFW6WHYH'DYLHVDWRUVWHYHGDYLHV#DODVNDJRY
)URP0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
6HQW7XHVGD\0DUFK30
7R/RHSS9LFWRULD72*&YLFWRULDORHSS#DODVNDJRY!'DYLHV6WHSKHQ)2*&
VWHYHGDYLHV#DODVNDJRY!
&F$PDQGD0F&DOHEDPFFDOHE#SDQWKHRQUHVRXUFHVFRP!
6XEMHFW7KHWD:HVW37'&%/
9LFWRULDDQG6WHYH±
3OHDVHVHHWKHDWWDFKHG&%/IRUWKH7KHWD:HVWZHOO7KLVLVWKH&%/GRQHUHFHQWO\DIWHU6WDJH
FHPHQW72&LVDURXQG
7KDQN\RX
0LFKDHO'XQFDQ
*UHDW%HDU3DQWKHRQ
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
$PDQGD0F&DOHE
)URP0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
6HQW7KXUVGD\0DUFK30
7R$PDQGD0F&DOHE
6XEMHFW):7KHWD:HVW37'GDLO\XSGDWH
$WWDFKPHQWV7KHWD:HVW''5SGI
&z/
&ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕DĂƌĐŚϵ͕ϮϬϮϮϭϭ͗ϱϯD
dŽ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ƵďũĞĐƚ͗&t͗dŚĞƚĂtĞƐƚηϭ;WdϮϮϭͲϭϬϲͿĚĂŝůLJƵƉĚĂƚĞ
^ĞĞĂƚƚĂĐŚĞĚ͘ĞŵĞŶƚƚŽƐƵƌĨĂĐĞ͕ŐŽŽĚƌĞƚƵƌŶƐ͕ŶŽĐĞŵĞŶƚĞǀĂůůŽŐ͘
&ƌŽŵ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕:ĂŶƵĂƌLJϮϲ͕ϮϬϮϮϭϭ͗ϯϱD
dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗ŵĂŶĚĂDĐĂůĞďфĂŵĐĐĂůĞďΛƉĂŶƚŚĞŽŶƌĞƐŽƵƌĐĞƐ͘ĐŽŵх
^ƵďũĞĐƚ͗dŚĞƚĂtĞƐƚηϭ;WdϮϮϭͲϭϬϲͿĚĂŝůLJƵƉĚĂƚĞ
sŝĐƚŽƌŝĂĂŶĚ^ƚĞǀĞʹ
WůĞĂƐĞƐĞĞƚŚĞĂƚƚĂĐŚĞĚZ͘tĞŚĂǀĞĐĞŵĞŶƚĞĚƐƵƌĨĂĐĞĐĂƐŝŶŐĂŶĚƌĞĐĞŝǀĞĚŐŽŽĚĐĞŵĞŶƚƌĞƚƵƌŶƐƚŽƐƵƌĨĂĐĞ͘
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞůƵŶĐĂŶ
'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
3KRQH
3KRQH 7RRO3XVKHU1
$3,1R37' )LHOG
IW $06/
IW
3%7'
)URP 7R +UV
$
%LW 6L]H 'HSWK 'HSWK )HHW %LWKUV .UHYV $YJ 1R]]OHV 7)$
>LQ@ ,Q 2XW 'ULOOHG 5XQ USP VTLQ
ó .\PHUD [[
55 ó .\PHUD [[
7LPH 'HSWK 0: 39 <3 0XG*DV5HDGLQJV8VHG
5LJ
7RWDO
3XPS 7\SH /LQHU6] 630 (II
)ORZ 633 3XPS 'HSWK 630 633
7ULSOH[
7ULSOH[
0' 79' ,QF2' ,' &RQQ /HQJWK
5
5
5
5
)+
5
5
5
1&
1&
;7
;7
;7
;7
7RWDO/HQJWKIW
MWV;7+:
MWV;7+:
-DUV:HDWKHUIRUG0HFK
HDôVOLFNPRQHOV
;2
)LOWHUVXE
%RWWOHQHFN;2
6$'11HXWURQ'HQVLW\
103RQ\FROODU
,QOLQH106WDE
7HOHVFRSH
106WDE
$UFYLVLRQ
$=,WHP &RPPHQW
0XGPRWRU
3XPS'DWD 6ORZ3XPS5DWHV
0RGHO
&RQWLQHQWDO(PVFR
&RQWLQHQWDO(PVFR
6XUYH\V %+$
&RQQHFWLRQ
7ULS*DV9ROXPH'HOLYHUHG
9LV $YDLODEOH
%DFNJURXQG$YJ
&76;%77'
0XG3URSHUWLHV *DV'HWDLOV )XHO
%LW3HUIRUPDQFH
%LW7\SH6HU$YJ523 ,$'&'XOO&RQGLWLRQ
:7$(,12
%+$
7RWDO+RXUV
Comments:
3XPS%%/VPXGSXVK'URSERWWRPSOXJ6/%PL[HGDQGSXPSHG%%/6/HDG%%/67DLO'URSWRSSOXJ
NLFNRXWZLWK%%/6ZDWHU5LJGLVSODFHG#%30
5XQ//7&FDVLQJEDNHUORFWRSLQHQGRI3HUIRUPIORDWFKHFNILOSLSHRQWKHIO\7RUTXHWRIWOEV7DJOHGJH#
:RUNSLSHDQGFLUFXODWH
:RUNSLSHFLUFXODWHWLJKWVSRWIURP
WR[[[[
3XPS%3033:RUNMRLQWVDQG
5XQFDVLQJSXPSLQJ*30ZRUNSDVWDODUJHFRDOEHG
0'
5XQFDVLQJIURPWR:DVKHGGRZQHYHU\RWKHUMRLQWXVLQJWKH&57
3LFNXSODQGLQJMRLQWDQGKDQJHUIURPVKHG5HPRYHUXQQLQJWRRO,QVWDOOVHDOVRQUXQQLQJWRRO7KMUHDGUXQQLQJWRROEDFNWR/-/DQG
KDQJHURQORDGVKRXOGHU
&LUFXODWHWKURXJK9RODQW&57VWDJHXSWR%3033IORZ5LJXSFHPHQWKRVHWRFLUFXODWLQJSRUWRQ&575HVXPH
SXPSLQJ3XPSDLUWKURXJKRXWVLGHFHPHQWOLQHIRUFHPHQWWUXFN$WWHPSWWRFOHDUZLWKVWHDPDSSHDUVEORFNHG5LJXSKRVHWRFHPHQW
WUXFN+ROG3-60LQ'RJKRXVHZLWK&HPHQWHUV7UXFNSXVKHUULJFUHZPXGPDQ&R0DQ3UHVVXUHWHVWOLQHVWR36,ORZ
+6((YHQWV1RLQFLGHQWVDFFLGHQWVRUVSLOOV307HPS
2SHUDWLRQDO'HWDLOV
0DNHXSKDQJHUWRODQGLQJMRLQWPDNHGULIWUXQZLWK&DPHURQKDQG&RPSOHWHPDLWHQDQFHRQFDVLQJHOHYDWRUVLQZHOGLQJVKRS/D \
GZRQ/-DQGKDQJHU5LJXS*%5WRQJV3-605XQFDVLQJ
KRXU)RUHFDVW5XQFDVLQJWRERWWRP&LUFXODWHDQGFRQGLWLRQWKHZHOO5LJXSFHPHQWHUVSXPSFHPHQW
:LQG'LUHFWLRQ1(
$07HPS
2SV#KUV3KDVH
:LQG6SHHG
KRXU6XPPDU\%ULQJDOOFDVLQJUXQQLQJHTXLSPHQWWRULJIORRU&RQGXFW
GXPP\UXQ
ZLWKODQGLQJMRLQWWRFRQILUPGLVWDQFHIURPULJ
IORRUWRORDGVKRXOGHU5LJXS*%59RODQW&57WRQJVUXQFDVLQJIURPVXUIDFHWR
:HDWKHU
*HQ&RQGLWLRQV
6FDWWHUHGFORXGV
OLJKWZLQGIUWKH1(
FRROLQJWUHQG
6KRH7HVW1$
$FWXDO'HSWK
/DVW'LYHUWHU'ULOO
3ODQ'HSWK
/DVW5LJ,QVS
1$
2':HLJKW /DVW6DIHW\0WJ30
&DVLQJ&RQGXFWRU 6XUIDFH ,QWHU72&
/DVW%23'ULOO
3URMHFW1XPEHU5.%&6*)OJIW
+ROH6L]H/DVW%237HVW
.%*/IW
3URJ)7'PG%XGJHW$PRXQW$FWXDO'D\VVLQFH6SXG5.%IW
7'#'DLO\&RVW3ODQQHG'D\V6SXGWR7'*/IW
3URJUHVV&XP&RVW6SXG'DWH
6XSHUYLVRU15REHUW:DOO -DNH+HQU\&DPS32%RQ
ORFDWLRQ
6RXWK3UXGKRH%D\/HDVHQR
5HSRUW
6XSHUYLVRU'0DUN%URXLOOHW 7RRO3XVKHU'%ULDQ3HGHUVRQ 5HSRUW'DWH
'DLO\'ULOOLQJ5HSRUW
:HOO1DPH7+(7$:(675LJ&RQWUDFWRU1RUGLF:HOO7\SH([SORUDWLRQ
WƌŽĚƵĐƚŝŽŶĂƐŝŶŐ
ĞŵĞŶƚKǀĞƌǀŝĞǁ
dŚĞƚĂtĞƐƚηϭǁĞůů
'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
DĂƌĐŚϭϬ͕ϮϬϮϮ
dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ
>ŝŶĞƌŽŵƉůĞƚŝŽŶ
^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ d
dK ĞƉƚŚ
^ƵƌĨĂĐĞ
WƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϴϭͬϮΗ ϱ͘ϱΗ ϭϳ ůďͬĨƚ WͲϭϭϬ d
dK͗ ĞƉƚŚ
>ŝŶĞƌ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϯϭͬϮΗ ϵ͘ϱ ůďͬĨƚ >ͲϴϬ >d
WĂĐŬĞƌ ĞƉƚŚ
ϴϯϬϬ
,ƵĞͬ,ZƐŚĂůĞ
ϳϬϮϲ
ϯϬϱϬ
ĂŶŶŝŶŐ^ŚĂůĞ
ϲϬϱϬ ϴϯϳϯ
^ƚĂŐĞϭ͕ĐĞŵĞŶƚĞĚĨƌŽŵƐŚŽĞ
ƚŽdKĂƚϳ͕ϰϮϬ
^ƚĂŐĞϮ͕ĐĞŵĞŶƚĞĚĨƌŽŵƐƚĂŐĞ
ƚŽŽůĂƚϳ͕ϮϮϳƚŽdKĂƚϲ͕ϬϱϬ
ϱ͘ϱ͟ĂƐŝŶŐ
ĞŵĞŶƚKǀĞƌǀŝĞǁ
ĞŵĞŶƚǁĂƐƉůĂĐĞĚŝŶƚǁŽ
ƐƚĂŐĞƐ͘
^ƚĂŐĞϭ>
^ƚĂŐĞϭŚĂĚĂĐĂůĐƵůĂƚĞĚƚŽƉŽĨĐĞŵĞŶƚ;dKͿ
ĐŝƌĐĂϳϰϬϬ͛ŵĚ͘
>ĐŽŶĨŝƌŵĞĚĞƐƚŝŵĂƚĞĚŵĞĂƐƵƌŝŶŐĂdKĂƚ
ĂƉƉƌŽdžŝŵĂƚĞůLJϳϰϮϬ͟
dK
^ƚĂŐĞϮ>
>ŵĞĂƐƵƌĞĚdKĨŽƌ^ƚĂŐĞϮĂƚĂƉƉƌŽdžŝŵĂƚĞůLJ
ϲ͕ϬϱϬD
dK
dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ
>ŝŶĞƌŽŵƉůĞƚŝŽŶ
^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ d
dK ĞƉƚŚ
^ƵƌĨĂĐĞ
WƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϴϭͬϮΗ ϱ͘ϱΗ ϭϳ ůďͬĨƚ WͲϭϭϬ d
dK͗ ĞƉƚŚ
>ŝŶĞƌ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϯϭͬϮΗ ϵ͘ϱ ůďͬĨƚ >ͲϴϬ >d
WĂĐŬĞƌ ĞƉƚŚ
ϴϯϬϬ
,ƵĞͬ,ZƐŚĂůĞ
ϳϬϮϲ
ϯϬϱϬ
ĂŶŶŝŶŐ^ŚĂůĞ
ϲϬϱϬ ϴϯϳϯ
>ŽǁĞƌ&&͕ĨƌŽŵ
ϳ͕ϰϱϬƚŽϴ͕ϯϬϬ
/ƐŽůĂƚĞĚďLJ^ƚĂŐĞϭ
ϱ͘ϱ͟ĂƐŝŶŐ
,LJĚƌŽĐĂƌďŽŶ/ƐŽůĂƚŝŽŶ
hƉƉĞƌ&&͕ĨƌŽŵ
ϲ͕ϴϮϬʹ ϳ͕ϭϯϬ
/ƐŽůĂƚĞĚďLJ^ƚĂŐĞϮ WĂLJ
,ƵĞ^ŚĂůĞ
WĂLJ
&ƌĂĐKǀĞƌǀŝĞǁ͗dŚĞƚĂtĞƐƚηϭ
DĂdžŝŵƵŵdƌĞĂƚŝŶŐWƌĞƐƐƵƌĞ͗ϳ͕ϰϬϬƉƐŝ
ƐƚŝŵĂƚĞĚǀĞƌĂŐĞdƌĞĂƚŝŶŐWƌĞƐƐƵƌĞ͗ϰ͕ϲϱϭƉƐŝ
dŚĞĂŵƉĂŶŝĂŶŝŶƚĞƌǀĂůŽĨƚŚĞdŚĞƚĂtĞƐƚǁĞůůƐŝƚƐďĞƚǁĞĞŶƚŚĞƌĞŐŝŽŶĂůƐŽƵƌĐĞ͕,Z
ƐŚĂůĞ͕ĂŶĚƚŚĞƚŽƉƐĞĂů͕ƚŚĞ,ƵĞ^ŚĂůĞ͘dŚŝƐĂŵƉĂŶŝĂŶŝŶƚĞƌǀĂůďĞƚǁĞĞŶƐĂŝĚƐŚĂůĞƐƌƵŶƐ
ĨƌŽŵϳ͕ϯϬϬ͛ƚŽϴ͕ϰϬϬ͛͘
dŚĞĂƐŝŶ&ůŽŽƌ&ĂŶŽƌ͞&&͟ƉŽƌƚŝŽŶŽĨƚŚĞdŚĞƚĂǁĞůůŝƐƚŚĞůŽǁĞƌĂŵƉĂŶŝĂŶƉĂLJ
ŝŶƚĞƌǀĂů͘/ƚǁŝůůďĞĐŽŵƉůĞƚĞĚŝŶƚŚƌĞĞĨƌĂĐƐƚĂŐĞƐ͘WĞƌĨŽƌĂƚŝŽŶƐĨŽƌƚŚĞĨƌĂĐƐƚĂŐĞƐǁŝůůďĞ
ĨƌŽŵϴϬϲϱͲϴϬϳϱ͕͛ϳϳϰϱͲϳϳϱϱ͕͛ĂŶĚϳϱϵϱͲϳϲϬϱ͛͘
ĂĐŚŝŶƚĞƌǀĂůǁŝůůďĞĨƌĂĐĐĞĚ ƚŚƌŽƵŐŚĂĨƌĂĐƚƌĞĞ͕ƐŚŽǁŶƚŽƚŚĞƌŝŐŚƚ͘dŚĞƚƌĞĞŝƐϭϬ͕ϬϬϬƉƐŝ
ƌĂƚĞĚĂůŽŶŐǁŝƚŚƚŚĞůŽǁĞƌǁĞůůŚĞĂĚǁŚŝĐŚŝƐĂůƐŽƌĂƚĞĚƚŽϭϬ͕ϬϬϬƉƐŝ͘dŚĞƚƌĞĞ͕ůŽǁĞƌ
ǁĞůůŚĞĂĚ͕ΘĐĂƐŝŶŐͬůŝŶĞƌŚĂǀĞďĞĞŶƚĞƐƚĞĚƚŽϳ͕ϰϬϬƉƐŝƉƌŝŽƌƚŽďĞŐŝŶŶŝŶŐĨƌĂĐƚƵƌŝŶŐ
ŽƉĞƌĂƚŝŽŶƐ͘
&ůŽǁďĂĐŬůŝŶĞǁŝůůďĞƚĞƐƚĞĚƚŽƚŚĞƚĞƐƚŝŶŐĐŽŶƚƌŽůŵĂŶŝĨŽůĚƚŽϱ͕ϬϬϬƉƐŝ͘
&ƌĂĐǁŝůůďĞƉƵŵƉĞĚƚŚƌŽƵŐŚƚŚĞƵƉƉĞƌĨůŽǁĐƌŽƐƐƐŚŽǁŶ͘tŝƌĞůŝŶĞǁŝůůďĞĐŽŶĚƵĐƚĞĚ
ƚŚƌŽƵŐŚƚŚĞƚŽƉƐǁĂďǀĂůǀĞ&ůŽǁďĂĐŬǁŝůůďĞĐŽŶŶĞĐƚĞĚƚŽƚŚĞǁŝŶŐǀĂůǀĞ͘
tŝƌĞůŝŶĞ
&ƌĂĐ
&ƌĂĐ
&ůŽǁďĂĐŬͬdĞƐƚŝŶŐ
DĂdžŝŵƵŵdƌĞĂƚŝŶŐWƌĞƐƐƵƌĞ͗ϳ͕ϰϬϬƉƐŝ
dĞƐƚŝŶŐǁŝůůďĞĐŽŶĚƵĐƚĞĚďLJĂƉƉůLJŝŶŐϳ͕ϰϬϬƉƐŝƚŽ
ƚŚĞƉƌŝŵĂƌLJŽƌĐĂƐŝŶŐƐŝĚĞŽĨƚŚĞǁĞůůŚĞĂĚͬĨƌĂĐ
ƚƌĞĞ͘^ƵƌĨĂĐĞĐĂƐŝŶŐƉƌĞƐƐƵƌĞǁŝůůďĞŵŽŶŝƚŽƌĞĚ
ƚŚƌŽƵŐŚŽƵƚŽƉĞƌĂƚŝŽŶƐǁŝƚŚƚŚĞĂďŝůŝƚLJƚŽďůĞĞĚ
ĚŽǁŶĂƐŶĞĐĞƐƐĂƌLJ͘
dƌĞĂƚŝŶŐƉƌĞƐƐƵƌĞƐĂƌĞĞdžƉĞĐƚĞĚƚŽďĞϮ͕ϬϬϬͲϰ͕ϬϬϬ
ƉƐŝĂƚƐƵƌĨĂĐĞ͕ĂƐŝŶĚŝĐĂƚĞĚďLJƚŚĞĂŵƉĂŶŝĂŶĨƌĂĐ
ŝŶƚŚĞdĂůŝƚŚĂǁĞůů͘>ŽƐƚĐŝƌĐƵůĂƚŝŽŶŝŶƚŚĞƌŽŽŬŝĂŶ
ŝŶƚĞƌǀĂůƐŚĂǀĞďĞĞŶƐĞĞŶĂƚŵƵĚǁĞŝŐŚƚƐďĞůŽǁϵ͘ϴ
ƉƉŐ͘dŚŝƐŝƐŶŽƚĂĚŝƌĞĐƚĐŽƌƌĞůĂƚŝŽŶƚŽĂŶƚŝĐŝƉĂƚĞĚ
ĨƌĂĐƚƵƌŝŶŐƉƌĞƐƐƵƌĞďƵƚŝƐĂŶŝŶĚŝĐĂƚŝŽŶƚŚĂƚƚŚĞƌĞ
ƐŚŽƵůĚŶŽƚďĞƐŝŐŶŝĨŝĐĂŶƚŝƐƐƵĞƐĐŽŵƉůĞƚŝŶŐ
ĨƌĂĐƚƵƌŝŶŐƚƌĞĂƚŵĞŶƚƐ͘dŚŝƐĂůƐŽƐƵƉƉŽƌƚƐƚŚĞůŽǁĞƌ
ĨƌĂĐŐƌĂĚŝĞŶƚƐĞĞŶŝŶƚŚĞdĂůŝƚŚĂĂŵƉĂŶŝĂŶǁĞůů͘
&ƌĂĐŐƌĂĚŝĞŶƚŝŶƚŚĞ,ZǁĂƐƚĞƐƚĞĚǀŝĂ>KdŝŶƚŚŝƐ
ǁĞůů͘dŚĞƌĞƐƵůƚǁĂƐĂϭϲ͘ϲƉƉŐĨƌĂĐŐƌĂĚŝĞŶƚ͘dŚŝƐ
ŝƐĂŶƚŝĐŝƉĂƚĞĚƚŽďĞǁĞůůĂďŽǀĞƚŚĞĂŵƉĂŶŝĂŶĨƌĂĐ
ŐƌĂĚŝĞŶƚ͘
ϱŬƌĂƚŝŶŐ͕ƉƌĞǀŝŽƵƐůLJ
ƉƌĞƐƐƵƌĞƚĞƐƚĞĚƚŽϰ͕ϱϬϬ
ƉƐŝ͘WŽƉŽĨĨƉƌĞƐƐƵƌĞƌĞůŝĞĨ
ƐĞƚƚŽϯ͕ϱϬϬ
ϭϬŬƌĂƚŝŶŐƉƌĞƐƐƵƌĞƚĞƐƚĞĚƚŽ
ϳ͕ϰϬϬƉƐŝ͕WŽƉŽĨĨƉƌĞƐƐƵƌĞƌĞůŝĞĨ
ƐĞƚƚŽϳ͕ϬϬϬƉƐŝ
WƌĞƐƐƵƌĞƐĚƵƌŝŶŐĨƌĂĐ
ϱ͘ϱ͟ĂƐŝŶŐ͕ǁŝůůďĞĞdžƉŽƐĞĚƚŽĨƌĂĐƉƌĞƐƐƵƌĞĂŶĚĨƌŝĐƚŝŽŶ
ƉƌĞƐƐƵƌĞ͘WƌĞƐƐƵƌĞƚĞƐƚĞĚƚŽϳ͕ϰϬϬƉƐŝǁŝƚŚĂƐƚĂƚĞĚďƵƌƐƚĂƚ
ϭϬ͕ϲϰϬƉƐŝ͘DĂdžĨƌĂĐƉƌĞƐƐƵƌĞǁŝůůďĞϳ͕ϰϬϬ
dŚĞƚĂtĞƐƚ
^ƵƌĨĂĐĞĐĂƐŝŶŐďƵƌƐƚƌĂƚŝŶŐϱ͕ϳϱϬƉƐŝ͘ϬƉƐŝŝƐƐĞĞŶŽŶƚŚĞƐƵƌĨĂĐĞ
ǀĂůǀĞƵƉƚŽƚŚŝƐƉŽŝŶƚĂŶĚǁĞǁŝůůĐŽŶƚŝŶƵĞƚŽŵŽŶŝƚŽƌ͕ǁŝƚŚƚŚĞ
ĂďŝůŝƚLJƚŽďůĞĞĚĚŽǁŶ͕ƚŚƌŽƵŐŚŽƵƚŽƉĞƌĂƚŝŽŶƐ
ϯ͘ϱ͟ϵ͘Ϯη>ͲϴϬ>ŝŶĞƌ͘ƵƌƐƚƌĂƚŝŶŐϭϬ͕ϭϲϬƉƐŝ͘
tŝůůďĞĞdžƉŽƐĞĚƚŽĨƌĂĐƉƌĞƐƐƵƌĞ͕ĞƐƚŝŵĂƚĞĚĂƚϮ͕ϬϬϬͲϰ͕ϬϬϬƉƐŝ
ĂďŽǀĞŚLJĚƌŽƐƚĂƚŝĐ͘WƌĞƐƐƵƌĞƚĞƐƚĞĚďĞĨŽƌĞƉĞƌĨŽƌĂƚŝŶŐƚŽϳ͕ϰϬϬ͘
dŚĞƚĂtĞƐƚͲtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐͲŽŵƉůĞƚĞ&&/ŶƚĞƌǀĂů
ŽŶĚƵĐƚŽƌ,ŽůĞ ŽŶĚƵĐƚŽƌWŝƉĞ
dždždždždždž dždždždždždždždždždždždždž ĞƉƚŚ
^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϰϬ ůďͬĨƚ
W&ĞƉƚŚ
WƌŽĚƵĐƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ
ϱ͘ϱΗ ůďͬĨƚ
'ƌĂĚĞ͗>ϴϬ
,ƵĞ^ŚĂůĞͲŽƚƚŽŵΛϳϰϮϬΖ
&&ηϭWĞƌĨƐ͗ϳϱϵϱΖͲϳϲϬϱΖ
&ƌĂĐWůƵŐΛϳϲϴϱΖ
&&ηϮWĞƌĨƐ͗ϳϳϰϱΖͲϳϳϱϱΖ &&WĞƌĨƐ;ϲƐƉĨ͖ϲϬĚĞŐƉŚĂƐĞ͖Ϭ͘ϯϲΗ,Ϳ
&ƌĂĐWůƵŐΛϴϬϬϱΖ
&&ηϭWĞƌĨƐ͗ϴϬϲϱΖͲϴϬϳϱΖ
,Z^ŚĂůĞͲdŽƉΛϴϰϭϬΖ
tĞŝŐŚƚ
ϮϴΗ ϮϬΗ ϭϮϵůďͬĨƚ
dK
W& W&^ƵƌĨĂĐĞ ϳϱΖ
tĞŝŐŚƚ
ϭϮϭͬϰΗ ϵϱͬϴΗ d
dK ĞƉƚŚ
^ƵƌĨĂĐĞ ϯϭϲϰΖ ΕϭϱϬϬΖ
>ͲϴϬ
ϭϳ WͲϭϭϬ ϲϰϯϬΖ
'ƌĂĚĞ dK
ϯ͘ϱΗ>ŝŶĞƌ tĞŝŐŚƚ͗ϵ͘ϮůďͬĨƚ
WĂĐŬĞƌdŽƉͲϳϬϮϲΖ >ŝŶĞƌdŽƉͲϳϬϯϯΖ
WĂĐŬĞƌŽƚƚŽŵͲϳϬϯϯΖ >ŝŶĞƌŶĚͲϴϮϳϳΖ
WdͲϴϯϳϲΖ
dͲϴϰϱϬΖ
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUBBBBBBBBBBBBBBBBBBB
2SHUDWRU1DPH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU )LHOG3RROV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
3DFNHUVDQG66697\SH 3DFNHUVDQG66690'IWDQG79'IW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
$XWKRUL]HG7LWOH
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
0LFKDHO'XQFDQ
PLFKDHO#JUHDWEHDUSHWURFRP
&KLHI2SHUDWLQJ2IILFHU
0LFKDHO'XQFDQ
7XELQJ*UDGH 7XELQJ0'IW3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
35(6(17:(//&21',7,216800$5<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/ ([SORUDWLRQ
$UFWLF%OYG$QFKRUDJH$ODVND
*UHDW%HDU3DQWKHRQ
7KHWD:HVW
/HQJWK 6L]H
1$
79' %XUVW
1$
0'
3HUIRUDWLRQ'HSWK0'IW
1$
1$
1$
1$1$
DSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
%237HVW0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
FWLRQ0,75HT
G"<HV 1R
SWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$2*&&86(21/<
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
H
FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
PHDQG
UHZLWK'DWH
0LFKDHO'XQFDQ
PLFKDHO#JUHDWEHDUSHWURFRP
&KLHI2SHUDWLQJ2IILFHU
0LFKDHO'XQFDQ
'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
2SHUDWLRQV 2,/:,1- :'63/6XVSHQGHG
SURYDO 'DWH *$6:$**6725 63/8*
HVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
6697\SH 3DFNHUVDQG66690'IWDQG79'IW
WV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF:HOO&ODVVDIWHUSURSRVHGZRUN
DWLRQV3URJUDP %236NHWFK([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
1$
7XELQJ*UDGH 7XELQJ0'IW3HUIRUDWLRQ'HSWK79'IW7XELQJ6L]H
1$1$
SWK0'IW
1$1$
RQ
DWH
RU
DO
&ROODSVH/HQJWK 6L]H 79' %XUVW0'
XHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:H 2SHUDWLRQVVKXWGRZQSDLU:HOO
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XE &KDQJH $SSURYHG3URJUDPOO7XELQJ
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUHU&DVLQJ BBBBBBBBBBBBBBBBBBB
PH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\'HYHORSPHQW
6WUDWLJUDSKLF 6HUYLFH $3,1XPEHU
J:HOO1DPHDQG1XPEHU
WLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
SHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
VLJQDWLRQ/HDVH1XPEHU)LHOG3RROV
'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
35(6(17:(//&21',7,216800$5<
([SORUDWLRQ
YG$QFKRUDJH$ODVND
QWKHRQ
7KHWD:HVW
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Samantha Carlisle at 3:08 pm, Feb 23, 2022
2022.02.23
14:48:16
-09'00'
5HIHU WR RULJLQDO 37' DSSURYDO IRU DOO &RQGLWLRQV RI $SSURYDO
9LFWRULD /RHSS
6)'
)LOH Z 37'
%23 WHVW WR SVLJ
&%/ LQWHUSUHWDWLRQ WR EH SURYLGHG WR $2*&&
;
'65
;
97/
GWV -/&
Jeremy
Price
Digitally signed
by Jeremy Price
Date: 2022.02.24
11:55:18 -09'00'
RBDMS SJC 022822
681'5<$33/,&$7,21
6XQGU\
&HPHQW:RUN
*UHDW%HDU3DQWKHRQ//&
7KHWD:HVW
37'
6(&7,21
&(0(1735(6(17$7,21
dŚĞƚĂtĞƐƚηϭĞŵĞŶƚƌĞŵĞĚŝĂƚŝŽŶƌĞǀŝĞǁ&ĞďƌƵĂƌLJϮϯ͕ϮϬϮϮ
tĞůůĐŽŶĚŝƚŝŽŶ͗ĞŵĞŶƚŝŶƐŝĚĞŽĨĐĂƐŝŶŐǁĂƐĚƌŝůůĞĚŽƵƚƚŽƚŚĞƐŚŽĞƚƌĂĐŬĂƚϴ͕Ϯϴϰ͘ƌŝůůŝŶŐĐĞŵĞŶƚĂůƐŽĚƌŝůůĞĚŽƵƚƚŚĞĐĞŵĞŶƚƐƚĂŐĞƚŽŽůĂƚϳ͕ϮϮϳ͘dŚĞ^ƚĂŐĞƚŽŽůŝƐĐŽŶĨŝƌŵĞĚŝŶƚŚĞŽƉĞŶƉŽƐŝƚŝŽŶ͘ĐĞŵĞŶƚďŽŶĚůŽŐ;>ͿǁĂƐƌƵŶ͘'ŽŽĚĐĞŵĞŶƚǁĂƐƐĞĞŶĨƌŽŵďŽƚƚŽŵƚŽϳ͕ϰϮϬ͘dŚŝƐĚĞƉƚŚŵĂƚĐŚĞƐĞdžƉĞĐƚĂƚŝŽŶƐĨƌŽŵǀŽůƵŵĞĐĂůĐƵůĂƚŝŽŶƐ͘dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐdĂƌŐĞƚĐŽŶĚŝƚŝŽŶĨŽƌǁĞůů^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ ddK ĞƉƚŚ^ƵƌĨĂĐĞWƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϴϭͬϮΗ ϱ͘ϱΗ ϭϳ ůďͬĨƚ WͲϭϭϬ ddK͗ ĞƉƚŚ&ŝƌƐƚ^ƚĂŐĞWůƵŐ ĞƉƚŚ^ƚĂŐĞƚŽŽů ĞƉƚŚϳϮϮϳ,ƵĞͬ,ZƐŚĂůĞϯϬϱϬĂŶŶŝŶŐ^ŚĂůĞϳϰϬϬŝƐŚ͍͍ ϴϯϳϯϳϭϵϬ
tĞůůĐŽŶĚŝƚŝŽŶ͗^ŚŽǁŶŽŶƚŚĞƌŝŐŚƚŝƐĂƉŽƌƚŝŽŶŽĨƚŚĞ>͘ƐƐŚŽǁŶĂŶĚĞdžƉĞĐƚĞĚ͕dKŝƐĂƚϳϰϮϬ͛ƌŝůůŝŶŐŽƵƚƚŚĞƐƚĂŐĞƚŽŽůƌĞŵŽǀĞĚƚŚĞůŽĂĚƐŚŽƵůĚĞƌƚŚĂƚŝƐŶŽƌŵĂůůLJƵƐĞĚƚŽĐůŽƐĞƚŚĞƚŽŽů͘dŚƵƐƚŚĞƐƚĂŐĞƚŽŽůŝƐŝŶĂŶ͞ŽƉĞŶ͟ĐŽŶĚŝƚŝŽŶ͘dŚŝƐŚĂƐďĞĞŶĐŽŶĨŝƌŵĞĚǁŝƚŚĂƉƌĞƐƐƵƌĞƚĞƐƚ͕ƐŚŽǁŝŶŐĐŽŵŵƵŶŝĐĂƚŝŽŶŽŶďŽƚŚƐŝĚĞƐŽĨƚŚĞĐĂƐŝŶŐ͘ĞŵĞŶƚƚŽďĞŚŝŶĚƉŝƉĞƚŽϳ͕ϰϮϬĐŽǀĞƌƐƚŚĞĞŶƚŝƌĞƚLJŽĨƚŚĞůŽǁĞƌƉĂLJŝŶƚŚĞǁĞůů͘dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐdĂƌŐĞƚĐŽŶĚŝƚŝŽŶĨŽƌǁĞůů^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ ddK ĞƉƚŚ^ƵƌĨĂĐĞWƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϴϭͬϮΗ ϱ͘ϱΗ ϭϳ ůďͬĨƚ WͲϭϭϬ ddK͗ ĞƉƚŚ&ŝƌƐƚ^ƚĂŐĞWůƵŐ ĞƉƚŚ^ƚĂŐĞƚŽŽů ĞƉƚŚϳϮϮϳ,ƵĞͬ,ZƐŚĂůĞϯϬϱϬĂŶŶŝŶŐ^ŚĂůĞϳϰϬϬŝƐŚ͍͍ ϴϯϳϯϳϭϵϬƌĞĂĂďŽǀĞĐĞŵĞŶƚ'ŽŽĚĞŵĞŶƚdŽƉŽĨĞŵĞŶƚ͕ϳϰϮϬdKŝƐĂƚϳϰϮϬ͛
dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐdĂƌŐĞƚĐŽŶĚŝƚŝŽŶĨŽƌǁĞůů^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ ddK ĞƉƚŚ^ƵƌĨĂĐĞWƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϴϭͬϮΗ ϱ͘ϱΗ ϭϳ ůďͬĨƚ WͲϭϭϬ ddK͗ ĞƉƚŚ&ŝƌƐƚ^ƚĂŐĞWůƵŐ ĞƉƚŚ^ƚĂŐĞƚŽŽů ĞƉƚŚϳϮϮϳ,ƵĞͬ,ZƐŚĂůĞϯϬϱϬĂŶŶŝŶŐ^ŚĂůĞϳϰϬϬŝƐŚ͍͍ ϴϯϳϯϳϭϵϬWĂƚŚĨŽƌǁĂƌĚ͗ϯƚŚŝŶŐƐĂƌĞŶĞĞĚĞĚ͗ϭͿ /ƐŽůĂƚŝŽŶĂĐƌŽƐƐƉĂLJ͗dŚŝƐŝƐĐŽŶĨŝƌŵĞĚďLJ>ǁŝƚŚdKĂƚϳϰϮϬĐŽǀĞƌŝŶŐƉĂLJϮͿ /ƐŽůĂƚŝŽŶĂďŽǀĞ͗dŚĞŽƌŝŐŝŶĂůůLJƉůĂŶŶĞĚ͞ƐĞĐŽŶĚƐƚĂŐĞ͟ŽĨĐĞŵĞŶƚŝƐƐƚŝůůŶĞĞĚĞĚ͘dŚĞŽƉĞŶƐƚĂŐĞƚŽŽůŐŝǀĞƐĂĐŝƌĐƵůĂƚŝŽŶƉĂƚŚ͘WƌĞǀŝŽƵƐĐĞŵĞŶƚĚĞƐŝŐŶĂŶĚƉůĂĐĞŵĞŶƚŝƐƐƚŝůůĂƉƉůŝĐĂďůĞϯͿ ĂƐŝŶŐ/ŶƚĞŐƌŝƚLJ͗dŚĞĂďŝůŝƚLJƚŽĐůŽƐĞƚŚĞƐƚĂŐĞƚŽŽůŝƐŶŽůŽŶŐĞƌƉƌĞƐĞŶƚ͘ůŝŶĞƌŝƐŶĞĞĚĞĚƚŽƐĞĂůĂĐƌŽƐƐƚŚŝƐƉŽƌƚŝŽŶŽĨƚŚĞĐĂƐŝŶŐ͘
dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐĞŵĞŶƚ^ƚĂŐĞϮ^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ ddK ĞƉƚŚ^ƵƌĨĂĐĞWƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϴϭͬϮΗ ϱ͘ϱΗ ϭϳ ůďͬĨƚ WͲϭϭϬ ddK͗ ĞƉƚŚ&ŝƌƐƚ^ƚĂŐĞWůƵŐ ĞƉƚŚ^ƚĂŐĞƚŽŽů ĞƉƚŚ ŽŵƌƉŽŵŝƐĞĚ^ƚĂŐĞƚŽŽůϳϮϮϳ,ƵĞͬ,ZƐŚĂůĞϯϬϱϬĂŶŶŝŶŐ^ŚĂůĞϳϰϬϬŝƐŚ͍͍ ϴϯϳϯϳϭϵϬWĂƚŚĨŽƌǁĂƌĚ͗ĞŵĞŶƚ^ĞĐŽŶĚ^ƚĂŐĞƚŚƌŽƵŐŚĐĞŵĞŶƚƌĞƚĂŝŶĞƌ
dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐƌŝůůŽƵƚƌĞƚĂŝŶĞƌ^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ ddK ĞƉƚŚ^ƵƌĨĂĐĞWƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϴϭͬϮΗ ϱ͘ϱΗ ϭϳ ůďͬĨƚ WͲϭϭϬ ddK͗ ĞƉƚŚ&ŝƌƐƚ^ƚĂŐĞWůƵŐ ĞƉƚŚ^ƚĂŐĞƚŽŽů ĞƉƚŚ ŽŵƌƉŽŵŝƐĞĚ^ƚĂŐĞƚŽŽůϳϭϵϬϳϮϮϳ,ƵĞͬ,ZƐŚĂůĞϯϬϱϬĂŶŶŝŶŐ^ŚĂůĞϳϰϬϬŝƐŚ͍͍ ϴϯϳϯWĂƚŚĨŽƌǁĂƌĚ͗ƌŝůůŽƵƚƌĞƚĂŝŶĞƌ
dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ>ŝŶĞƌŽŵƉůĞƚŝŽŶŝĚĞĂ^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ ddK ĞƉƚŚ^ƵƌĨĂĐĞWƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶϴϭͬϮΗ ϱ͘ϱΗ ϭϳ ůďͬĨƚ WͲϭϭϬ ddK͗ ĞƉƚŚ&ŝƌƐƚ^ƚĂŐĞWůƵŐ ĞƉƚŚ^ƚĂŐĞƚŽŽů ĞƉƚŚ /ƐŽůĂƚĞƐƐƚĂŐĞƚŽŽůϳϮϮϳ,ƵĞͬ,ZƐŚĂůĞϯϬϱϬĂŶŶŝŶŐ^ŚĂůĞϳϰϬϬŝƐŚ͍͍ ϴϯϳϯϳϭϵϬϯ͘ϱΗůŝŶĞƌWĂƚŚĨŽƌǁĂƌĚ͗ZƵŶ>ŝŶĞƌƚŽƉƌŽǀŝĚĞŵĞĐŚĂŶŝĐĂůŝŶƚĞŐƌŝƚLJĨŽƌƐƚŝŵƵůĂƚŝŽŶ
6(&7,21
&(0(17352&('85(
ZĞŵĞĚŝĂůĞŵĞŶƚWƌŽŐƌĂŵ
dŚĞƚĂtĞƐƚηϭ
ϭ Z/,ǁͬĐĞŵĞƚŶƌĞƚĂŝŶĞƌŽŶϮϳͬϴΗƚƵďŝŶŐƚŽϳϭϮϳΖ
Ϯ ^ĞƚƌĞƚĂŝŶĞƌ͕ŵŽǀŝŶŐĨŝŶĂůůŽĐĂƚŝŽŶƚŽƐĞƚŝŶƚŚĞŵŝĚĚůĞŽĨĂũŽŝŶƚƚŽĂǀŽŝĚĐŽůůĂƌƐ
ϯ ůŽƐĞĂŶŶƵůĂƌƌĂŵƐĂŶƉƌĞƐƐƵƌĞƚĞƐƚƚŽǀĞƌŝĨLJƌĞƚĂŝŶĞƌŝƐƐĞƚ
ϰ WƵŵƉĐĞŵĞŶƚƉĞƌĐĞŵĞŶƚĚĞƐŝŐŶ
ϱ hŶƐƚŝŶŐĨƌŽŵĐĞŵĞŶƚƌĞƚĂŝŶĞƌ
ϲ sĞƌŝĨLJŶŽĨůŽǁƚŽĐŽŶĨŝƌŵĐůŽƐĞĚƌĞƚĂŝŶĞƌ
ϳ dKK,
ϴ d/,ǁͬŵŝůůƚŽŽƚŚďŝƚ͕ŵƵĚŵŽƚŽƌ͕ĂŶĚƚƵďŝŶŐ
ϵ dĂŐĐĞŵĞŶƚƌĞƚĂŝŶĞƌ
ϭϬ ƌŝůůƌĞƚĂŝŶĞƌĂŶĚĐĞŵĞŶƚ
ϭϭ ŽŶƚŝŶƵĞĚƌŝůůŝŶŐĂŶLJŽďƐƚƌƵĐƚŝŽŶƐƚŽd
ϭϮ ^ǁŝƚĐŚǁĞůůďŽƌĞĨůƵŝĚƚŽďƌŝŶĞ
ϭϯ dKK,
ϭϰ D/ZhǁŝƌĞůŝŶĞ
ϭϱ Z/,ǁŝƚŚǁŝƌĞůŝŶĞĂŶĚ>
ϭϲ ZĞƉŽƌƚ>ƌĞƐƵůƚƐƚŽK'
ϭϳ d/,ǁͬůŝŶĞƌĂŶĚůŝŶĞƌƌƵŶŶŝŶŐƚŽŽů
ϭϴ ^ĞƚůŝŶĞƌŽŶďŽƚƚŽŵ͕ĐŽǀĞƌŝŶŐǁĞůůďŽƌĞĨƌŽŵƚĚ;ϴϮϴϰͿƚŽϳϭϮϳ
ϭϵ ĞŵĞŶƚůŝŶĞƌŝŶƉůĂĐĞƉĞƌĐĞŵĞŶƚƉƌŽŐƌĂŵ
ϮϬ dKK,
Ϯϭ d/,ǁͬůŝŶĞƌƚŽƉƉĂĐŬĞƌ
ϮϮ ^ĞƚƉĂĐŬĞƌŝŶƉŽůŝƐŚďŽƌĞƌĞĐĞƉƚŝĐĂůĂƚƚŽƉŽĨůŝŶĞƌ
Ϯϯ WƌĞƐƐƵƌĞƚĞƐƚǁĞůůďŽƌĞƚŽϯϱϬϬƉƐŝ
Ϯϰ dKK,
Ϯϱ ZDKWĂĐŬĞƌĞŵĞŶƚƐĞĐŽŶĚƐƚĂŐĞƌŝůůŽƵƚƌĞƚĂŝŶĞƌ>ZƵŶ>ŝŶĞƌ
6(&7,21
&(0(17'(6,*1
6HFRQG6WDJH&HPHQWLQJ3URJUDP
6WULQJ3URGXFWLRQ&DVLQJ
:HOO1DPH7KHWD:HVW
&RPSDQ\*UHDW%HDU3DQWKHRQ//&
)LHOG
&RQWDFW0LFKDHO'XQFDQ
3URSRVDO1XPEHU
'DWH
0DGH%\5R[DQQH0DULQR
6HUYLFHIURP'LVWULFW3UXGKRH%D\$.$
'LVWULFW3KRQH
2EMHFWLYH3XPSVHFRQGVWDJHWKURXJKVWDJH
WRROZLWK72&DWIW
$FFHSWDQFH&ULWHULD3XPSDVSHUSURJUDP5DWH
'HQVLW\3UHVVXUH
RI
'RFXPHQW&RQWURO
Once approved by Schlumberger and the Operator, any deviation from this program requires document agreement (SLB
QHSE Standard S010 Management of Change and Exemption Standard)
Approvals
Name Signature Date
Author Roxanne Marino
Schlumberger review Stephen Lauper
Customer Approval Michael Duncan
“By signing this document (or confirmation email), I confirm I have reviewed and approved it as the basis for the well cementing
program.”
Distribution List :
Cementing Program Generated From
Cementics File theta west_ 5.5-in prod_two stage_top final.jdcx
Cementics Version 2020.2.4
Revision History
Date Version Description Author
2/23/22 4 Cement retainer and tubing added RMarino
2/13/22 3 TOC changed to 5400 ft RMarino
RI
:HOO'DWD6XPPDU\
The cementing program incorporates the following data :
RigType Land
Fluids Return to Rig Floor
BHST 137.1 degF
All depths take the rig floor as reference
Mud Line Depth 0.0 ft
Mud Return Depth 0.0 ft
Section MD 7227.0 ft
Section TVD 7226.5 ft
Tubulars and Casing Hardware
MD
ft
OD
in
Joint
ft
Weight
lb/ft
ID
in
Grade Collapse
psi
Burst
psi
Thread
Prev Casing 110.0 20 40.0 94.0 19.124 K-55 520 2110
3030.0 9 5/8 40.0 40.0 8.835 L-80 3090 5750
Tubing 7127.0 2 7/8 40.0 6.8 2.441 X95 12940 12548
Casing 7227.0 5 1/2 40.0 17.0 4.892 P-110 7480 10640
Landing Collar 7147.0 Serial number :
RI
Open Hole
Total Volume 363.1 bbl
Minimum Diameter 8.500 in
Maximum Diameter 8.500 in
Mean Diameter 8.500 in
Mean Annular Excess 40.0 %
Mean Equivalent Diameter 9.437 in
Formation
Top
MD
ft
Bottom
MD
ft
Bottom
TVD
ft
Frac
Top ED
lb/gal
Frac
Bottom
ED
lb/gal
Pore
Top ED
lb/gal
Pore
Bottom
ED
lb/gal
Lithology
Res.
Fluid Name
0.0 70.0 70.0 10.50 10.50 8.40 8.40
70.0 1400.0 1400.0 10.50 10.50 8.40 8.43 Permafrost
1400.0 3000.0 3000.0 10.50 10.50 8.43 8.40 Sandstone
3000.0 4000.0 4000.0 10.50 10.50 8.40 8.40 Sandstone
4000.0 7227.0 7226.5 10.50 11.00 8.40 8.40 Sandstone
RI
Temperature
Name Top MD
ft
Bottom MD
ft
Bottom TVD
ft
Temperature
degF
Gradient
degF/100ft
Relative
Gradient
degF/100ft
Sea Current
ft/min
Surface 0.0 0.0 0.0 20.0 0.00 -196702.76
Rock 0.0 1200.0 1200.0 39.4 1.62 1.62 0.00
Rock 1200.0 2500.0 2500.0 60.5 1.62 1.62 0.00
Rock 2500.0 3500.0 3500.0 76.7 1.62 1.62 -196702.76
Rock 3500.0 4000.0 4000.0 84.8 1.62 1.62 0.00
Rock 4000.0 7200.0 7199.5 136.6 1.62 1.62 0.00
BHST 7200.0 7227.0 7226.5 137.1 1.62 1.62 0.00
Rock 7227.0 7600.0 7599.4 143.1 1.62 1.62 0.00
Rock 7600.0 8600.0 8599.4 159.3 1.62 1.62 0.00
Rock 8600.0 9000.0 8999.4 165.8 1.62 1.62 0.00
Rock 9000.0 9400.0 9399.4 172.3 1.62 1.62 0.00
RI
)OXLGV6XPPDU\
Fluids
Type Name Density
lb/gal
Conditions K
lbf.s^n/ft2
n Ty
lbf/100ft2
Wash Fresh Water 8.32 Manual 1.04E-4 1.00 1.00
Drilling Fluid WBM 1 9.20 Manual 0.00E+0 0.00 0.00
Spacer MUDPUSH II
Spacer 1
9.80 Manual 0.00E+0 0.00 0.00
Wash Fresh Water 1 8.32 Manual 0.00E+0 0.00 0.00
Slurry 15.8 ppg slurry 1 15.80 Manual 1.23E-2 0.78 0.00
Slurry 13.0ppg Lead Slurry
1
13.00 Manual 1.03E-2 0.71 4.00
* Compressible Rheology Parameters and Densities are displayed at P=1 atm and T=20 degC (65degF)
RI
0XG&LUFXODWLRQ
Fluid WBM
Number of Circulation 2.65
Total Volume at Ambient T 1125.0 bbl
Ambient Temperature 60.0 degF
Correction Slope 0.80
Pumping Stages
Fluid Pump Rate
bbl/min
Duration
hr:mn
Volume
bbl
WBM 2.0 00:15 30.0
WBM 4.0 00:15 60.0
WBM 5.0 00:15 75.0
8.0 02:00 960.0
Well Security
Status Description Min Differential
Pressure
psi
At Depth
ft
At Time
hr:mn
Success Fracturing 92 3030.0 02:45
Success Production/Influx 215 3030.0 02:45
Success Burst 9549 0.0 02:45
Success Collapse 12564 7127.0 02:45
RI
)OXLG3ODFHPHQW
Surface Densities are computed at P=1 atm and T=Surface Temperature (20.0 degF)
Fluid Placement in Annulus
Fluid Name Top MD
ft
Bottom MD
ft
Length
ft
Volume
bbl
Surface Density
lb/gal
WBM 0.0 4699.7 4699.7 236.1 9.20
MUDPUSH II Spacer 4699.7 5400.0 700.3 40.0 9.80
13.0ppg Lead Slurry 5400.0 6500.0 1100.0 62.8 13.00
15.8 ppg slurry 6500.0 7227.0 727.0 41.5 15.80
Fluid Placement in Pipe
Fluid Name Top MD
ft
Bottom MD
ft
Length
ft
Volume
bbl
Surface Density
lb/gal
WBM 0.0 5479.7 5479.7 31.7 9.20
Fresh Water 5479.7 7147.0 1667.3 10.0 8.32
15.8 ppg slurry 7147.0 7227.0 80.0 1.9 15.80
RI
3XPSLQJ6FKHGXOH
Pumping Schedule
Fluid Name Duration
hr:mn
Volume
bbl
Pump
Rate
bbl/min
Injection
Temperature
degF
Comment
Cumulated
Time
hr:mn
MUDPUSH II Spacer 00:20 40.0 2.0 68.0 Cement Line 00:20
13.0ppg Lead Slurry 1 00:31 62.8 2.0 68.0 Cement Line 00:51
15.8 ppg slurry 1 00:22 43.4 2.0 68.0 Cement Line 01:13
Fresh Water 00:05 10.0 2.0 68.0 Cement Line 01:18
WBM : 00:22 31.7 Rig Displaces
> WBM 00:10 20.0 2.0 68.0 01:28
> WBM 00:12 11.7 1.0 68.0 slow down for plug bump 01:40
Maximum Required Hydraulic Horsepower (HHP)30.1 hhp (at 00:00 hr:mn)
RI
:HOO6HFXULW\
Well Security
Status Description Min Differential
Pressure
psi
At Depth
ft
At Time
hr:mn
Success Fracturing 32 7227.0 01:40
Success Production/Influx 208 3030.0 01:40
Success Burst 10022 7127.0 01:40
Success Collapse 12102 7127.0 01:40
Success Dead-End Collapse 6495 7127.0 01:40
Success Dynamic u-tubing in Dead-End 0 0.0 00:00
Success Balanced u-tubing in Dead-End 0 0.0 00:00
RI
7HPSHUDWXUH2XWSXWV
Temperature Summary Table
Static Temperature. at TOC 107.5 degF Static Temperature at BH 137.1 degF
Simulated HCT at TOC 83.2 degF Simulated HCT at BH 70.5 degF
Max First SK Temperature 83.2 degF Max Last SK Temperature 70.4 degF
At time 01:40 hr:mn At time 01:40 hr:mn
RI
&HQWUDOL]DWLRQ
Centralizers
Alias Manufacturer
Commercial
Name Type Config Csg OD
in
Min OD
in
Max OD
in
Count
CT_2A05500675000C
0
CaseTech Std Bow Spring bow-
spring
5 1/2 6.000 7.625 54
Pattern Placement
Bottom MD
ft
Joints Centralizer Alias Pattern Min STO Depth
ft
4000.0 100.00 CT_2A05500675000C0 0 0.0 3540.0
9000.0 0.00 CT_2A05500675000C0 2/3 0.0 7227.0
Computation time: Cement Turns 00:39
RI
:(//&/($1
,,,
Average Fluid Concentrations
Average fluid concentration in annulus Average fluid concentration in pipe
RI
Final Fluid Concentrations
RI
Post-Processing Results (Annulus)
RI
'$3(5785(
Average Fluid Concentrations
Average fluid concentration in annulus Average fluid concentration in pipe
RI
Final Fluid Concentrations
RI
Post-Processing Results (Annulus)
RI
2SHUDWRU6XPPDU\
Volume Summary
Fluid Name Pumped Volume
bbl
Prepared Fluid
Dead Volume
bbl
Prepared Fluid
bbl
Mix Fluid Dead
Volume
bbl
Silo dead
volume
ton
15.8 ppg slurry 1 43.4 0.0 43.4 0.0 0
13.0ppg Lead Slurry 1 62.8 0.0 62.8 0.0 0
MUDPUSH II Spacer 40.0 2.0 42.0 0.0 0
Fresh Water 10.0 0.0 10.0 0.0 0
Material Summary
Additive Pumped
Quantity
Required
Quantity
Loadout
Quantity
Loadout
Items
Pack.
Name
Pack.
Size
Comment
D031 3607 lb 3788 lb 3788 lb 34.43 sack 110 lb
Fresh Water 4965 gal 5043 gal 5043 gal 0.00 0 gal
D182 186 lb 195 lb 195 lb 3.91 sack 50 lb
15.8 ppg slurry 1 Blend 19732 lb 19732 lb 19732 lb 0.00 bulk 0 lb
Mix Water 2982 gal 2982 gal 2982 gal 0.00 0 gal
D177 5 gal 5 gal 5 gal 0.10 drum 55 gal
D255 162 lb 162 lb 162 lb 7.38 sack 22 lb
D047 14 gal 14 gal 14 gal 2.81 pail 5 gal
D065 93 lb 93 lb 93 lb 1.85 sack 50 lb
13.0ppg Lead Slurry 1
Blend
16693 lb 16693 lb 16693 lb 0.00 bulk 0 lb
D013 75 lb 75 lb 75 lb 1.50 sack 50 lb
D110 9 gal 9 gal 9 gal 1.78 pail 5 gal
D020 1169 lb 1169 lb 1169 lb 10.62 sack 110 lb
D153 67 lb 67 lb 67 lb 2.67 sack 25 lb
D079 50 lb 50 lb 50 lb 0.50 sack 100 lb
RI
Fluid Preparation
15.8 ppg slurry 1
Pumped Volume : 43.4 bbl
Density : 15.80 lb/gal
SVF : 40.5 %
Yield : 1.16 ft3/sk
Dry Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Dry Phase 19870 lb 19870 lb
15.8 ppg slurry 1 Blend: 94 lb per sack 19732 lb 19732 lb 19732 lb
- G 100.0 % BVOB 19732 lb 19732 lb 19732 lb
D255 0.4 % BWOC 79 lb 79 lb 79 lb
D065 0.3 % BWOC 59 lb 59 lb 59 lb
Liquid Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Mix Fluid 5.106 gal/sk VBWOB 1072 gal 1072 gal
Mix Water 5.031 gal/sk VBWOB 1056 gal 1056 gal 1056 gal
Fresh Water 5.031 gal/sk VBWOB 1056 gal 1056 gal 1056 gal
D177 0.025 gal/sk VBWOC 5 gal 5 gal 5 gal
D047 0.050 gal/sk VBWOC 10 gal 10 gal 10 gal
13.0ppg Lead Slurry 1
Pumped Volume : 62.8 bbl
Density : 13.00 lb/gal
SVF : 25.8 %
Yield : 1.99 ft3/sk
Dry Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Dry Phase 18171 lb 18171 lb
13.0ppg Lead Slurry 1
Blend:
94 lb per sack 16693 lb 16693 lb 16693 lb
- G 100.0 % BVOB 16693 lb 16693 lb 16693 lb
D013 0.5 % BWOC 75 lb 75 lb 75 lb
D020 7.0 % BWOC 1169 lb 1169 lb 1169 lb
D255 0.5 % BWOC 83 lb 83 lb 83 lb
D065 0.2 % BWOC 33 lb 33 lb 33 lb
D153 0.4 % BWOC 67 lb 67 lb 67 lb
D079 0.3 % BWOC 50 lb 50 lb 50 lb
Liquid Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Mix Fluid 10.914 gal/sk VBWOB 1938 gal 1938 gal
Mix Water 10.844 gal/sk VBWOB 1926 gal 1926 gal 1926 gal
Fresh Water 10.844 gal/sk VBWOB 1926 gal 1926 gal 1926 gal
D110 0.050 gal/sk VBWOC 9 gal 9 gal 9 gal
D047 0.020 gal/sk VBWOC 4 gal 4 gal 4 gal
RI
MUDPUSH II Spacer
Pumped Volume : 40.0 bbl
Density : 10.00 lb/gal
Weighting Material Concentration Pumped Quantity Required Quantity Loadout Quantity
MUDPUSH II Spacer
Weighting Material:
2.15 lb/gal WBVOSpacer 3607 lb 3788 lb 3788 lb
- D031 2.15 lb/gal WBVOSpacer 3607 lb 3788 lb 3788 lb
Base Fluid Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Liquid Phase 0.9 bbl/bbl BVOSpacer 1580 gal 1659 gal
Fresh Water 0.9 bbl/bbl BVOSpacer 1563 gal 1641 gal 1641 gal
D182 5.00 lb/bbl WBVOBF 186 lb 195 lb 195 lb
Fresh Water
Pumped Volume : 10.0 bbl
Density : 8.32 lb/gal
Base Fluid Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Liquid Phase 1.0 bbl/bbl BVOWash 420 gal 420 gal
Fresh Water 1.0 bbl/bbl BVOWash 420 gal 420 gal 420 gal
RI
&DUOLVOH6DPDQWKD-2*&
)URP/RHSS9LFWRULD72*&
6HQW7KXUVGD\)HEUXDU\$0
7R0LFKDHO'XQFDQ
&F/RHSS9LFWRULD72*&
6XEMHFW7KHWD:HVW37'&HPHQWUHWDLQHU$33529$/
ƉƉƌŽǀĂůŝƐŐƌĂŶƚĞĚƚŽƌƵŶƚŚĞĐĞŵĞŶƚƌĞƚĂŝŶĞƌŝŶƚŚĞǁĞůů͘
sŝĐƚŽƌŝĂ>ŽĞƉƉ
&ƌŽŵ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ĞŶƚ͗dŚƵƌƐĚĂLJ͕&ĞďƌƵĂƌLJϮϰ͕ϮϬϮϮϴ͗ϭϳD
dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗dŚĞƚĂtĞƐƚηϭ;WdϮϮϭͲϭϬϲͿĞŵĞŶƚƌĞƚĂŝŶĞƌ
sŝĐƚŽƌŝĂʹ
tĞĂƌĞƉƌĞƉĂƌŝŶŐƚŽƌƵŶƚŚĞĐĞŵĞŶƚƌĞƚĂŝŶĞƌŝŶƚŚĞǁĞůů͘/ƐĞĞŬǀĞƌďĂů;ĞŵĂŝůͿĂƉƉƌŽǀĂůƚŽŵŽǀĞĨŽƌǁĂƌĚǁŝƚŚƚŚŝƐƐƚĞƉ͘
WůĞĂƐĞůĞƚŵĞŬŶŽǁ͘
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞůƵŶĐĂŶ
'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
ϴϭϳ͘ϮϰϬ͘ϯϴϲϱ
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
as l- loco
Meenrices
os
/.�� A ScNumbergar �Y
Field Shipping Manifest &&ft Nr
Nordic 3 ow
Dry Samples Set A (AOGCC)
DATE 2/8/2022
Operator
Great Bear Pa itheon
WELL Theta West 1
Location
North Slope Alaska
FROM:
Geoservices Nordic 3 Rig
Contact Numbers
Geoservices Contact: Warner Morales +1 713 480 8141
Great Bear Pantheon Geologist: 303-947-6354
AOGCC: 907-793-1235
SHIP TO: 333 W. 7th Anchorage, AK 9501
NOTE TO ORIGINATOR: SAVE TIME AND $$-AVOID MISINTERETATIONS-USE COMPLETE,
DETAILED INSTRUCTIONS IN ORDER FOR THE TERMINAL TO QUICKLY AND ACCURATELY
EXECUTE YOUR REQUESTS.
QTY
Container # Container #
Number of Samples Via Transport
Owned
b
P 0
Depth (ft) Total Weight
Lbs
1
Brown Box # 1
25
Truck
GBP
360 - 1080
25
1
Blue Box 1
Brown Box # 2
25
Truck
GBP
1110 - 1830
25
1
Brown Box # 3
25
Truck
GBP
1860 - 2580
25
1
Brown Box # 4
25
Truck
GBP
2610 - 3300
25
1
Blue Box 2
Brown Box # 5
25
Truck
GBP
3330 - 4050
25
1
Brown Box # 6
25
Truck
GBP
4080 - 4800
25
1
Brown Box # 7
25
Truck
GBP
4830 - 5550
25
1
Blue Box 3
Brown Box # 8
25
Truck
GBP
5580 - 6300
25
1
Brown Box # 9
25
Truck
GBP
6330 - 6810
25
1
Brawn Box # 10
25
Truck
GBP
6820 - 7060
25
1
Blue Box 4
Brown Box # 11
25
Truck
GBP
7070 - 7310
25
1
Brown Box # 12
25
Truck
GBP
7320 - 7560
25
1
Brown Box # 13
25
Truck
GBP
7570 - 8020
25
1
Blue Box 5
Brown Box # 14
22
Truck
GBP
8040 - 8452
25
TOTALS
14
Envelopes : 347 1
360 - 8452
350
Please Handle this box and its contents with care!
RECEIVED
FEB 14 2022
AOGCC
no_, �, 1�B12
Schlurn berger-Private
STATE OF ALASKA Reviewed By: 334)
OIL AND GAS CONSERVATION COMMISSION P.I. Supry L z"r-t—
BOPE Test Report for: THETA WEST 1 Comm
Contractor/Rig No.: Nordic 3 PTD#: 2211060 DATE: 1/27/2022 Inspector Austin McLeod Insp Source
Operator: Great Bear Pantheon, LLC Operator Rep: Brouillet/Wall Rig Rep: Pederson/Hansen Inspector
Type Operation: EXPL Sundry No: Test Pressures: Inspection No: bopSAM220129102423
Rams: Annular: Valves: MASP:
Type Test: [NIT 250/5000 . 250/2500 - 250/5000 3800 % Related Insp No:
TEST DATA
MISC. INSPECTIONS:
MUD SYSTEM:
P/F
ACCUMULATOR SYSTEM:
P/F
P/F
P/F
Visual Alarm
1
Time/Pressure P/F
Location Gen.:
P
Trip Tank
P _P
P--
System Pressure 2950 P -
Housekeeping:
P
Pit Level Indicators
P _
P
Pressure After Closure 1500 P
PTD On Location
P
Flow Indicator
P -
P
200 PSI Attained 26 P
Standing Order Posted
P
Meth Gas Detector
P
P �
Full Pressure Attained 138 P "
Well Sign
P
H2S Gas Detector
P_ -
P -
Blind Switch Covers: All stations P '
Drl. Rig
P
MS Misc
NA
NA
Nitgn. Bottles (avg): 4g2000 - P
Hazard Sec.
P
#4 Rams
ACC Misc 0 NA
Misc
NA
FLOOR SAFTY VALVES:
BOP STACK:
-_NA
CHOKE MANIFOLD:
Number of Failures: 0 Test Results Test Time 6.5
Remarks: 4" joint. Annular 18 secs; Rams 6 secs; HCR's 2 secs. CH Misc - pre choke mainifold.
Quantity
P/F
Quantity Size
P/F
Quantity
P/F
Upper Kelly
1
P--
Stripper
0__
_NA
-
No. Valves 12 -
P--
-- .,
L.uwe� Keu,y
1 %
P'
Annular Preventer
1 -_ 13-5/8" -
_P -
Manual Chokes 1_____
P
Ball Type
1
P
#1 Rams
1 2-7/8"x5-1/2"-
P
Hydraulic Chokes I
P -
Inside BOP
_ 1
P
#2 Rams
1 Blinds -
P _
CH Misc I =
_P_
FSV Misc
0
NA
#3 Rams
1 , 2-7/8"x5-1/2"-
P
#4 Rams
0
NA
#5 Rams
- —
_
-_NA
INSIDE REEL VALVES:
#6 Rams
_0
0
NA
(Valid for Coil Rigs Only)
Choke Ln. Valves
1 _ 3-1/8"
P -
Quantity
P/F
HCR Valves
_ 2 '3-1/8"
P -
Inside Reel Valves 0
NA
—
Kill Line Valves
2 ' 3-1/8"
P -
Check Valve
0
NA
BOP Misc
0
NA
Number of Failures: 0 Test Results Test Time 6.5
Remarks: 4" joint. Annular 18 secs; Rams 6 secs; HCR's 2 secs. CH Misc - pre choke mainifold.
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION Reviewed By:
P.I. Supry
DIVERTER Test Report for: THETA WEST 1 Comm
Contractor/Rig No.: Nordic 3 . PTD#: 2211060 - DATE: 1/21/2022 " Inspector Adam Earl _ Insp Source
Operator: Great Bear Pantheon, LLC Operator Rep: Duncan/Brouillet Rig Rep: Jake Henry Inspector
Well Class: EXP Inspection No: divAGE220124125835
Related Insp No:
MISC. INSPECTIONS:
GAS DETECTORS:
Visual Alarm
Methane: P` P -
Hydrogen Sulfide: P P
Gas Detectors Mise: 0 NA
Number of Failures:
Remarks:
0
TEST DATA
MUD SYSTEM:
PIF
Location Gen.:
P
Housekeeping:
P "
Warning Sign
P
24 hr Notice:
P
Well Sign:
P
Drlg. Rig.
P
Misc:
NA
GAS DETECTORS:
Visual Alarm
Methane: P` P -
Hydrogen Sulfide: P P
Gas Detectors Mise: 0 NA
Number of Failures:
Remarks:
0
TEST DATA
MUD SYSTEM:
P/F
Visual
Alarm
Trip Tank:
P
P
Mud Pits:
P .
P "
Flow Monitor:
P
P '
Mud System Mise:
0
NA
ACCUMULATOR SYSTEM:
P/F
Time/Pressure
PIF
Systems Pressure: 2900 -
P -
Pressure After Closure: 1475
P
200 psi Recharge Time: 30
P
Full Recharge Time: 157
P
Nitrogen Bottles (Number of): 4
P
Avg. Pressure: 2050
P
Accumulator Misc: 0
NA
DIVERTER SYSTEM:
Size
P/F
Designed to Avoid Freeze-up?
P
Remote Operated Diverter?
P
No Threaded Connections?
P
Vent line Below Diverter?
P
Diverter Size: 21.25
P
Hole Size: 12.25
P
Vent Line(s) Size: 16
P `
Vent Line(s) Length: 85
P
Closest Ignition Source: 75
P
Outlet from Rig Substructure: 75
P `
Vent Line(s) Anchored:
P "
Turns Targeted / Long Radius:
NA
Divert Valve(s) Full Opening:
P "
Valve(s) Auto & Simultaneous:
Annular Closed Time: 25----
P
Knife Valve Open Time: 10
P
Diverter Misc: 0
NA
Test Time: 2.5
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Michael Duncan
Chief Operating Officer
Great Bear Pantheon
3705 Arctic Blvd., Suite 2324
Anchorage, AK 99503
Re: Exploratory Field, Exploratory Pool, Theta West 1
Great Bear Patheon
Permit to Drill Number: 221-106
Surface Location: 3000' FEL, 4860' FNL, T07N, R11E, SEC. 32, UM
Bottomhole Location: 3000' FEL, 4860' FNL, T07N, R11E, SEC. 32, UM
Dear Mr. Duncan:
Enclosed is the approved application for the permit to drill the above referenced well.
Drilling operations must cease before penetrating the potentially over-pressured Kuparuk
Formation.
All dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals
from below the permafrost or from where samples are first caught and 10' sample intervals through
target zones.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Jeremy M. Price
Chair
DATED this ___ day of January, 2022.
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.01.10
14:25:39 -09'00'
D7\SHRI:RUN E3URSRVHG:HOO&ODVV ([SORUDWRU\*DV 6HUYLFH:$* 6HUYLFH'LVS F6SHFLI\LIZHOOLVSURSRVHGIRU
'ULOO /DWHUDO 6WUDWLJUDSKLF7HVW 'HYHORSPHQW2LO 6HUYLFH:LQM 6LQJOH=RQH &RDOEHG*DV *DV+\GUDWHV
5HGULOO 5HHQWU\ ([SORUDWRU\2LO 'HYHORSPHQW*DV 6HUYLFH6XSSO\ 0XOWLSOH=RQH *HRWKHUPDO 6KDOH*DV
2SHUDWRU1DPH %RQG %ODQNHW 6LQJOH:HOO :HOO1DPHDQG1XPEHU
%RQG1R
$GGUHVV 3URSRVHG'HSWK )LHOG3RROV
0'79'
D/RFDWLRQRI:HOO*RYHUQPHQWDO6HFWLRQ 3URSHUW\'HVLJQDWLRQ
6XUIDFH
7RSRI3URGXFWLYH+RUL]RQ '15$SSURYDO1XPEHU $SSUR[LPDWH6SXG'DWH
7RWDO'HSWK $FUHVLQ3URSHUW\ 'LVWDQFHWR1HDUHVW3URSHUW\
E/RFDWLRQRI:HOO6WDWH%DVH3ODQH&RRUGLQDWHV1$' .%(OHYDWLRQDERYH06/IW 'LVWDQFHWR1HDUHVW:HOO2SHQ
6XUIDFH[ \ =RQH WR6DPH3RRO
'HYLDWHGZHOOV .LFNRIIGHSWK IHHW 0D[LPXP3RWHQWLDO3UHVVXUHVLQSVLJVHH$$&
0D[LPXP+ROH$QJOH GHJUHHV 'RZQKROH 6XUIDFH
+ROH &DVLQJ :HLJKW *UDGH &RXSOLQJ /HQJWK 0' 79' 0' 79'
35(6(17:(//&21',7,216800$5<7REHFRPSOHWHGIRU5HGULOODQG5H(QWU\2SHUDWLRQV
-XQNPHDVXUHG
79'
+\GUDXOLF)UDFWXUHSODQQHG" <HV 1R
$WWDFKPHQWV 3URSHUW\3ODW %236NHWFK 'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW 6KDOORZ+D]DUG$QDO\VLV
'LYHUWHU6NHWFK 6HDEHG5HSRUW 'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
'DWH
3HUPLWWR'ULOO $3,1XPEHU 3HUPLW$SSURYDO
1XPEHU'DWH
&RQGLWLRQVRIDSSURYDO ,IER[LVFKHFNHGZHOOPD\QRWEHXVHGWRH[SORUHIRUWHVWRUSURGXFHFRDOEHGPHWKDQHJDVK\GUDWHVRUJDVFRQWDLQHGLQVKDOHV
6DPSOHVUHT
G<HV1R 0XGORJUHT
G<HV1R
+6PHDVXUHV<HV1R 'LUHFWLRQDOVY\UHT
G<HV1R
6SDFLQJH[FHSWLRQUHT
G<HV1R ,QFOLQDWLRQRQO\VY\UHT
G<HV1R
3RVWLQLWLDOLQMHFWLRQ0,7UHT
G<HV1R
$33529('%<
$SSURYHGE\ &200,66,21(5 7+(&200,66,21 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEH
GHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
6XUIDFH
3HUIRUDWLRQ'HSWK79'IW
*/%)(OHYDWLRQDERYH06/IW
&RPPLVVLRQ8VH2QO\
6HHFRYHUOHWWHUIRURWKHU
UHTXLUHPHQWV
3HUIRUDWLRQ'HSWK0'IW
$XWKRUL]HG7LWOH
$XWKRUL]HG6LJQDWXUH
3URGXFWLRQ
/LQHU
,QWHUPHGLDWH
(IIHFW'HSWK0'IW (IIHFW'HSWK79'IW
&RQGXFWRU6WUXFWXUDO
/HQJWK&DVLQJ
&HPHQW4XDQWLW\FIRUVDFNV
&HPHQW9ROXPH 0'6L]H
3OXJVPHDVXUHG
LQFOXGLQJVWDJHGDWD
&DVLQJ3URJUDP 7RS6HWWLQJ'HSWK%RWWRP6SHFLILFDWLRQV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
3(50,772'5,//
$$&
$XWKRUL]HG1DPH
LRQVRIDSSURYDO ,IER[LVFKHFNHGZHOOPD\QRWEHXVHGWRH[SORUHIRUWHVWRUSURGXFHFRDOEHGPHWKDQHJDVK\GUDWHVRUJDVFRQWDLQHGLQVKDOHV
6DPSOHVUHT
G<HV1R 0XGORJUHT
G<HV1R
+6PHDVXUHV<HV1R 'LUHFWLRQDOVY\UHT
G<HV1R
6SDFLQJH[FHSWLRQUHT
G<HV1R ,QFOLQDWLRQRQO\VY\UHT
G<HV1R
3RVWLQLWLDOLQMHFWLRQ0,7UHT
G<HV1R
6HHFRYHUOHWWHUIRURWKHU
UHTXLUHPHQWV
3HUPLW$SSURYDO
'DWH
$3,1XPEHUWR'ULOO
HU
&RPPLVVLRQ8VH2QO\
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
'DWH
KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLV WUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEH
HGIURPZLWKRXWSULRUZULWWHQDSSURYDO
L]HG7LWOH
L]HG6LJQDWXUH
L]HG1DPH
WDFKPHQWV 3URSHUW\3ODW %236NHWFK'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW 6KDOORZ+D]DUG$QDO\VLV
'LYHUWHU6NHWFK 6HDEHG5HSRUW'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV
XOLF)UDFWXUHSODQQHG"<HV 1R
3HUIRUDWLRQ'HSWK79'IWDWLRQ'HSWK0'IW
/LQHU
3URGXFWLRQ
QWHUPHGLDWH
6XUIDFH
GXFWRU6WUXFWXUDO
79'0'&HPHQW 9ROXPH6L]H/HQJWK&DVLQJ
-XQNPHDVXUHG(IIHFW'HSWK79'IW(IIHFW'HSWK0'IW3OXJVPHDVXUHG7RWDO'HSWK79'IWO'HSWK0'IW
35(6(17:(//&21',7,216800$5<7REHFRPSOHWHGIRU5HGULOODQG5H(QWU\2SHUDWLRQV<
LQFOXGLQJVWDJHGDWD0'79'/HQJWK 0' 79'&DVLQJ :HLJKW *UDGH &RXSOLQJH
&HPHQW4XDQWLW\FIRUVDFNVVLQJ3URJUDP7RS6HWWLQJ'HSWK%RWWRP6SHFLILFDWLRQV
YLDWHGZHOOV.LFNRIIGHSWKIHHW 0D[LPXP3RWHQWLDO3UHVVXUHVLQSVLJ VHH$$&
0D[LPXP+ROH$QJOHGHJUHHV 'RZQKROH6XUIDFH
FDWLRQRI:HOO6WDWH%DVH3ODQH&RRUGLQDWHV1$' .%(OHYDWLRQDERYH06/IW 'LVWDQFHWR1HDUHVW:HOO2SHQ
H[\=RQHWR6DPH3RRO*/%)(OHYDWLRQDERYH06/IW
UHVV3URSRVHG'HSWK)LHOG3RROV
0'79'
RFDWLRQRI:HOO*RYHUQPHQWDO6HFWLRQ 3URSHUW\'HVLJQDWLRQ
H
3URGXFWLYH+RUL]RQ'15$SSURYDO1XPEHU $SSUR[LPDWH6SXG'DWH
'HSWK$FUHVLQ3URSHUW\ 'LVWDQFHWR1HDUHVW3URSHUW\
UDWRU1DPH %RQG %ODQNHW 6LQJOH:HOO :HOO1DPHDQG1XPEHU
%RQG1R
SHRI:RUN E3URSRVHG:HOO&ODVV ([SORUDWRU\*DV 6HUYLFH:$* 6HUYLFH'LVSF6SHFLI\LIZHOOLVSURSRVHGIRU
/DWHUDO 6WUDWLJUDSKLF7HVW 'HYHORSPHQW2LO 6HUYLFH:LQM 6LQJOH=RQH &RDOEHG*DV *DV+\GUDWHV
5HHQWU\ ([SORUDWRU\2LO 'HYHORSPHQW*DV 6HUYLFH6XSSO\ 0XOWLSOH=RQH *HRWKHUPDO 6KDOH *DV
)RUP5HYLVHG7KLVSHUPLWLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDOSHU$$&J
By Meredith Guhl at 3:49 pm, Dec 02, 2021
*UHDW %HDU 3DQWKHRQ
$UFWLF %OYG $QFKRUDJH $ODVND
)(/
)1/ 8 71 5( 6(&
)(/
)1/ 8 71 5( 6(&
)(/
)1/ 8 71 5( 6(&
%
$'/
SHQGLQJ
7KHWD :HVW
([SORUDWLRQ
PLOHV
1$
1$
/ /7& FI
3 /7& FI
0LFKDHO 'XQFDQ
&KLHI 2SHUDWLQJ 2IILFHU
0LFKDHO 'XQFDQ
PLFKDHO#JUHDWEHDUSHWURFRP
✔
✔
✔
✔
✔✔
✔
✔✔
✔
✔
✔
'65
1$'
([SORUDWRU\2LO
<HV
&':
5LJ LQVSHFWLRQ E\ $2*&& UHTXLUHG SULRU WR VSXG
,QLWLDO %23 WHVW WR SVLJ DQQXODU SUHYHQWHU WHVW WR SVLJ
6XEVHTXHQW %23 WHVWV WR SVLJ
&%/ UHTXLUHG RQ FDVLQJ FHPHQW /RJV DQG LQWHUSUHWDWLRQ WR EH VXEPLWWHG WR $2*&& ZKHQ DYDLODEOH
6HSDUDWH VXQGULHV UHTXLUHG IRU IUDFWXUH VWLPXODWLRQV IORZ WHVWLQJ DQG SOXJJLQJ DQG DEDQGRQLQJ6XEPLW GDLO\ GULOOLQJ RSHUDWLRQV UHSRUWV WKUX HPDLO
6& /27 WR $2*&&
97/
;
6)'
0LQLPXP /27 SSJ 2YHU SUHVVXUHG .XSDUXN ZLOO QRW EH SHQHWUDWHG
dts 1/10/2021 JLC 1/10/2022
1/10/22
Jeremy Price Digitally signed by Jeremy Price
Date: 2022.01.10 14:27:24 -09'00'
6(&7,21
:(//3/$7
6(&7,21D
:(//3/$7
320 1000500250Feet16 Nov 2021Joe Alston-1 of 1-Great Bear PANTHEONTheta West #1Permit to DrillSECTION 32, T7N, R11EUMIAT MERIDIANNAD 83Alaska State Plane Zone 45007501000Scale31335293028643000 FTF.E.L.4860 FTF.N.L.Theta West #1Inline: 1441XLine: 1105NAD 83
6(&7,21E
:(//3/$1
7KHWD:HVW33URSRVDO*HRGHWLF5HSRUW'HI3ODQ&RPPHQWV0'IW,QFO$]LP*ULG79'66IW79'IW96(&IW16IW(:IW7)'/6IW'LUHFWLRQDO'LIILFXOW\,QGH[([FOXVLRQ=RQH$OHUW([FOXVLRQ=RQH$QJOH*HR0DJ7KQ71RUWKLQJIW86(DVWLQJIW86/DWLWXGH16
/RQJLWXGH(:
57( 0 1$ 1 :GL 30.00 0.00 0.00 -210.00 30.00 0.00 0.00 0.00 0M0.00 0.00 9.55 9486.45 5817385.00 1709895.00 N 69 54 42.45 W 149 26 51.73 0 1 : 0 1 :MSL 240.00 0.00 0.00 0.00 240.00 0.00 0.00 0.00 0M0.00 0.00 9.55 9486.75 5817385.00 1709895.00 N 69 54 42.45 W 149 26 51.73 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 :&VJ 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 :IWDERYH06/79'5HIHUHQFH(OHYDWLRQ*URXQG(OHYDWLRQIWDERYH06/)LHOG5HSRUW'DWH166RXWK([SORUDWLRQ&OLHQW*UHDW%HDU1RYHPEHU300LQLPXP&XUYDWXUH/XELQVNL7UXH1RUWKIWIW5RWDU\7DEOH6XUYH\'/6&RPSXWDWLRQ79'5HIHUHQFH'DWXP9HUWLFDO6HFWLRQ$]LPXWK9HUWLFDO6HFWLRQ2ULJLQ$3,7KHWD:HVW6WUXFWXUH6ORW:HOO%RUHKROH[[[[[7KHWD:HVW7KHWD:HVW7:/RFDWLRQ*ULG1(<;1$'$ODVND6WDWH3ODQH=RQH86)HHWIW&RRUGLQDWH5HIHUHQFH6\VWHP6XUYH\1DPH7KHWD:HVW36XUYH\'DWH7RWDO*UDYLW\)LHOG6WUHQJWKPJQ%DVHG7RWDO&RUU0DJ1RUWK!*ULG1RUWK*UDYLW\0RGHOQ7'2;7RWDO0DJQHWLF)LHOG6WUHQJWK0DJQHWLF'LS$QJOH1RUWK5HIHUHQFH)HEUXDU\%**07UXH1RUWK*ULG&RQYHUJHQFH8VHG*ULG6FDOH)DFWRU9HUVLRQ3DWFK:HOO+HDG/RFDO&RRUG5HIHUHQFHG7R0DJQHWLF'HFOLQDWLRQ'HFOLQDWLRQ'DWH0DJQHWLF'HFOLQDWLRQ0RGHO1
:
7RUW$+''',(5'5DWLR&56*ULG&RQYHUJHQFH$QJOH1RYHPEHU/RFDWLRQ/DW/RQJ1IW86(IW86'ULOOLQJ2IILFH303DJHRI166RXWK([SORUDWLRQ?7DOLWKD?7DOLWKD?7DOLWKD3%?7DOLWKD3%3^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ=RQH6)'1$'$
&RPPHQWV0'IW,QFO$]LP*ULG79'66IW79'IW96(&IW16IW(:IW7)'/6IW'LUHFWLRQDO'LIILFXOW\,QGH[([FOXVLRQ=RQH$OHUW([FOXVLRQ=RQH$QJOH*HR0DJ7KQ71RUWKLQJIW86(DVWLQJIW86/DWLWXGH16
/RQJLWXGH(:
0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 : 0 1 :7' 1 :3DUW0')URPIW0'7RIW(28)UHTIW+ROH6L]HLQ&DVLQJ'LDPHWHULQ([SHFWHG0D[,QFOLQDWLRQGHJ 6/%B0:'67' 7KHWD:HVW36/%B0:'67' 7KHWD:HVW36XUYH\(UURU0RGHO,6&:6$5HY
'&RQILGHQFHVLJPD6XUYH\3URJUDP'HVFULSWLRQ6XUYH\7RRO7\SH %RUHKROH6XUYH\'ULOOLQJ2IILFH303DJHRI166RXWK([SORUDWLRQ?7DOLWKD?7DOLWKD?7DOLWKD3%?7DOLWKD3%3^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
6(&7,21
%/2:28735(9(17,21
(48,30(17',$*5$0
'(6&5,37,21
5LJ(%RRN
ZŝŐϯͲŽŽŬ
ϮϬϮϬ
EŽƌĚŝĐĂůŝƐƚĂ
ϮϭϵĂƐƚ/ŶƚĞƌŶĂƚŝŽŶĂůŝƌƉŽƌƚZŽĂĚ͕^ƵŝƚĞϮϬϬ
ŶĐŚŽƌĂŐĞ͕ůĂƐŬĂϵϵϱϭϴ
;ϵϬϳͿ ϱϲϭͲϳϰϱϴ
EŽƌĚŝĐĂůŝƐƚĂZŝŐϯͲŽŽŬ
dĂďůĞŽĨŽŶƚĞŶƚƐ
x ZŝŐ/ŶǀĞŶƚŽƌLJ
x WůĂŶsŝĞǁƐ
x ,ĂnjĂƌĚŽƵƐƌĞĂƌĂǁŝŶŐƐ
x DƵĚWŝƚ^ĐŚĞŵĂƚŝĐƐ
x KW^ĐŚĞŵĂƚŝĐƐ
x 'ĂƐƵƐƚĞƌ^ĐŚĞŵĂƚŝĐƐ
x ŚŽŬĞDĂŶŝĨŽůĚ^ĐŚĞŵĂƚŝĐƐ
125',&&$/,67$
5,*,19(1725<
'HUULFN
x '5(&2-DFNNQLIH0RGHO0¶
x +RRN/RDG OEVZOLQHVWULQJXS
OEVZOLQHVWULQJXS
x :LQG5HVLVWDQFH PSKQRVHWEDFN
PSKZVHWEDFN
x 5DFNLQJ&DSDFLW\ ¶[´GULOOSLSH
x 'HDGOLQH$QFKRU 683(5,250RGHO/IRU´OLQH
x %HOO\ERDUGIRUVPDOO2'WXEXODUV
7UDYHOLQJ(TXLSPHQW
x 7UDYHOLQJ%ORFNV±0&.,66,&.7[´VKHDYHVJURRYHG´
OLQH
x +RRN%-8QLPDWLFWRQ
x /LQNV%-´[´WRQ6HWRI´;´WRQHOHYDWRU
OLQNV
'UDZZRUNV
x ,'(&20RGHO(KSUDWLQJSRZHUHGE\*(HOHFWULFPRWRU
FRXSOHGWR,'(&2VSHHGWUDQVPLVVLRQFZPDNHXSDQGEUHDNRXWTXLFN
WRUTXHF\OLQGHUVDQG±%$</25'<1$0,&EUDNH
3ULPH0RYHUV
x ±&$7(53,//$50RGHO',7$NZHDFK
x ±&$7(53,//$565JHQHUDWRUVYDFNYDHDFK
x ,360RGHO6&5DQGJHQHUDWRUFRQWUROGULOOLQJV\VWHP
5RWDU\(TXLSPHQW
x ±&223(5&50RGHO´URWDU\WDEOHZ´7DEOH%XVKLQJV
x ±7(6&2+&,+\GUDXOLFRYHUHOHFWULFWRQUDWHG7RS'ULYH
0D[%UHDNRXW7RUTXH IWOEV
0D[0DNHXS7RUTXH IWOEV
'ULOOLQJ7RUTXH+LJK IWOEV#USP
'ULOOLQJ7RUTXH/RZ IWOEV#USP
x ±(OHFWULFRYHUK\GUDXOLFSRZHUXQLWUDWHGDWKSFRQWLQXRXV
x ±7RUTXH$UUHVW6\VWHP
x ±*DUGQHU'HQYHU6:6ZLYHO
0XG6\VWHP3XPSV
x ±&217,1(17$/(06&2)KSZSVLSUHVVXUHUDWLQJ)
7ULSOH[3XPS3HUIRUPDQFH'DWD
/LQHU6L]HDQG3UHVVXUH5DWLQJ
6WURNHVSHU0LQXWH+RUVHSRZHU5DWLQJ´SVL´SVL´SVL
*DOORQVSHU
5HYROXWLRQ
7DEOHLVEDVHGRQYROXPHWULFHIILFLHQF\DQGPHFKDQLFDOHIILFLHQF\
x 3RZHUHGE\*(0RGHO'&PRWRU
x ´VZDEVOLQHUVLQFOXGHG
x 3XPSVFDQEHRSHUDWHGFRQWLQXRXVO\DWQRPRUHWKDQRISXEOLVKHG
SUHVVXUHUDWLQJDQGRISXEOLVKHGVWURNHVSHUPLQXWHUDWLQJVWURNHV
SHUPLQXWH
x 3XOVDWLRQGDPSHQHU+<'5,/.SVL
125',&&$/,67$
5,*,19(1725<
x 5HOLHI9DOYHV27(&2±´SVL
0XG3LWV
x ±EEOZRUNLQJSLWV
x ±EEOSLOOSLW
x ±EEOWULSWDQN
x 7RWDOVXUIDFHFDSDFLW\±EEO
x ±6ZDFRDJLWDWRUVKS
x ±/REHVWDUVKHDUPL[HUJSP
x /RZSUHVVXUHPXGOLQHLQFOXGLQJMHWWLQJJXQVDQGVXUIDFHJXQV
x ±0,66,21KSPL[LQJSXPSV´;´
x ±0,66,21KSWUDQVIHUSXPSV´;´
x &RPSDUWPHQWHTXDOL]HUV
x 6XQNHQVXFWLRQV
x &OHDQRXWOLQH´;´
x )ORZ/LQH-HWV
x 9DFXXPFOHDQLQJV\VWHPIRURLOEDVHGPXGV
6ROLGV&RQWUROV
x 6:$&20RQJRRVH3URVKDOHVKDNHUV
x $ELOLW\WRLQVWDOOUHQWDOFHQWULIXJHRQULJIRUDGGLWLRQDOVROLGVFRQWURODW
FOLHQW¶VUHTXHVW
'HJDVVLQJ(TXLSPHQW
x 6:$&2FRPSDFW*309DFXXP'HJDVVHU
x ´3225%2<'HJDVVHUWRDOORZJDVYHQWLQJ
x 9HQWLODWLRQV\VWHPDXWRPDWLFH[KDXVWIDQV
0DQLIROGV
x ±´SVLPXGOLQHVWRPXGPDQLIROGFRQVLVWLQJRI±´DQG´
%$.(5YDOYHVDQG±&$0(521´+FKRNH
x 9DOYHV±%$.(5´[´±SVLFZ±&$0(521+EOHHGYDOYH
x ±´6WDQGSLSHDQG.HOO\KRVH7RS'ULYH
x ±´6WDQGSLSH6HUYLFH/LQH
x ±´5HYHUVH&LUFXODWLQJ/LQH
5LJ7DQN&DSDFLWLHV
x ±EEOERLOHUEORZGRZQWDQNVLQJOHZDOOSRUWDEOH
x ±EEOFXWWLQJVWDQNVLQJOHZDOOSRUWDEOH
x ±JDOORQ8/6'IXHOFDSDFLW\GRXEOHZDOOHGWDQN
x ±JDOORQ/6'IXHOFDSDFLW\GRXEOHZDOOHGWDQN
x EEOIUHVKZDWHUWDQN
x ,QGHSHQGHQW%$</25'<1$0,&DQGEUDNHIODQJHFRROLQJWDQN
)LUHDQG6DIHW\
x $%&/RZ7HPSHUDWXUH)LUH([WLQJXLVKHUV
x &DUERQ'LR[LGH)LUH([WLQJXLVKHUV
x ±)LUVW$LG.LWV
x ±-$&2%66WHWFKHUZLWKWUDXPDEODQNHWDQGVWUDSV
x ±$16,&RPSOLDQW(\H:DVK6WDWLRQV
x ±$16,±&RPSOLDQW(PHUJHQF\6KRZHU
x ±)L[HG/(/+6 20RQLWRUV
x ±3RUWDEOH*DV0HWHU
SJ\
±)L[HG/(/+6 20RQLWRUV
125',&&$/,67$
5,*,19(1725<
x ±6&%$VZLWKFDVHVDQGPLQXWHERWWOHV
x &RPSOLDQW)DOO3URWHFWLRQ6\VWHPVHIIHFWLYHIRUDOOVFRSHVRIZRUN
x &RPSOLDQW(\H3URWHFWLRQDSSURSULDWHIRUWKHVFRSHRIZRUN
x &RPSOLDQW(DU3URWHFWLRQDSSURSULDWHIRUWKHVFRSHRIZRUNDQGPHDVXUHG
QRLVHOHYHOV
x &KHPLFDOO\5HVLVWDQW$SURQVDQG*ORYHV
x )ODPH5HWDUGDQW&ORWKLQJ
x ±5HVSLUDWRUVRUJDQLFYDSRUGXVWSDUWLFOHPDVNVZHOGHUV
x $16,&RPSOLDQW+DUG+DWV
x &RQILQHG6SDFH$LU%ORZHU
x &RPSOLDQW(OHFWULFDO33(IRU3HUPLWWHG:RUNDQG7HVWLQJ
x &RPSOLDQW:HOGHU33(
x )ODPPDEOH/LTXLGV6WRUDJH&DELQHWV
6XEVWUXFWXUH
x 0D[LPXPFDSDFLW\OEVZLWKOEVRQWDEOHDQGOEV
VHWEDFN
x %23GXDOKRLVWKDQGOLQJV\VWHPUDWHGWRQZLWKWZROLIWSODWHV
x ±38//0$67(50K\GUDXOLFDOO\RSHUDWHGZLQFK
x ±%5$'(1%*K\GUDXOLFDOO\RSHUDWHGPDQZLQFK
x ,1*(562//5$1'.8DLUZLQFK
x 'RJKRXVHDQGFKDQJHKRXVH
x +\GUDXOLFFDWZDONSLSHVNDWHDQGSLSHUDFNV
x ±+\GUDXOLFSLSHHOHYDWRUV
x ±68//$,5DLUFRPSUHVVRUV
x ¶;¶ULJPDWVLQFOXGHGWRVXSSRUWULJVWUXFWXUHZKHQUHTXLUHG
x $ELOLW\WRULJXSDZLUHOLQHVOXEULFDWRURQWKHULJIORRU
:HOO&RQWURO(TXLSPHQW
x ±YDOYH&$0(521FKRNHPDQLIROG´±SVLZ&$0(521´
PDQXDOFKRNHIXOO+6WULPZ´±SVL75,)/2:K\GUDXOLFFKRNH
DQGDFWXDWRUSDQHOZDQQXODUDQGGULOOSLSHSUHVVXUHVHQVLQJDQGVWURNH
FRXQWHUDQGWRWDOL]HU
x ±+<'5,/JDOORQVWDWLRQDFFXPXODWRUZGXDOHOHFWULFDQGDLU
SXPSVZHOHFWULFRYHUK\GUDXOLFUHPRWHXQLWDWGULOOHUVWDWLRQ
0DQXIDFWXUHGLQDFFRUGDQFHZLWK$3,53FRPSOLHVZLWKFXUUHQW
$2*&&UHJXODWLRQV
x ±&$7PRGHOJSP#SVL%23WHVWSXPS
x ±´0&$0(521JDWHYDOYHVWRVXLWGULOOLQJVSRROV
x ±+&5YDOYH´±SVLRQGULOOLQJVSRRO
x ±´(8(SVL)269
%ORZ2XW3UHYHQWLRQ(TXLSPHQW
'LYHUWHU6\VWHP
x ±´+<'5,/SVL:3063DQQXODUSUHYHQWHU
x ±´±SVL:3GLYHUWHUVSRROZLWK±´RXWOHW
x ±´K\GUDXOLFNQLIHJDWHYDOYH
x ±´KHDY\ZDOOZHDUVOHHYH±¶
x ±´±0;´±0GRXEOHVWXGGHGDGDSWHUIODQJH
x ¶´GLYHUWHUOLQHVSLHFHVLQFOXGLQJVWXGVDQGJDVNHWV
´SVL%ORZ2XW3UHYHQWHU6WDFNFRQVLVWLQJRI
x +<'5,/W\SH*.DQQXODUVWXGGHGWRSDQGIODQJHGERWWRP
x +<'5,/7\SH9GRXEOHJDWHIODQJHGWRSDQGERWWRP
x 'ULOOLQJVSRROIODQJH[IODQJHZHD´IODQJHGVLGHRXWOHWV
SJ
¶´GLYHUWHUOLQHVSLHFHVLQFOXGLQJVWXGVDQGJDVNHWV
125',&&$/,67$
5,*,19(1725<
x +<'5,/W\SH9VLQJOHJDWH
x 3LSHUDPVVL]HVDQGTXDQWLW\&62%OLQG´´´´´
´´´
x VHWRIYDULDEOHERUHUDPV´±´9%5
x HD¶%23VNLGIRUDERYHLWHPV
1RWH%OLQGVKHDUUDPVQRWLQFOXGHG5DP%23LQFRPSOLDQFHZLWK1$&(UHTXLUHPHQWV$3,VWDQGDUG$5HY
FXUUHQWLQVSHFWLRQE\$3,4&HUWLILHGVKRS&RPSOLHVZLWKFXUUHQW$2*&&UHJXODWLRQV
,QVWUXPHQWDWLRQ
x ±*(1(5$/021,725*DVGHWHFWLRQVWDWLRQPHWKDQHDQG+6
VHQVRUVDQGDODUPVH[KDXVWV\VWHP
x ±+,7(&OLQHVFDOHZHLJKWLQGLFDWRU
x ±+,7(&K\GUDXOLFZHLJKWLQGLFDWRURUOLQH
x ±+,7(&FRQQHFWLRQWRUTXHJDXJH
x ±3$621IORZVKRZLQGLFDWRUZSLWYROXPHLQGLFDWRUVDQGORVVJDLQ
DODUP
x ±3$621397V\VWHP,QWHUQHWFRQQHFWLYLW\QRWLQFOXGHG
x ±&URZQ6DYHU
x ±*$,7521,&6ULJSKRQHFRPPXQLFDWLRQV\VWHPWRORFDWLRQV
(OHFWULFDO
x ±0RWRU&RQWURO6\VWHPLQFOXGLQJ,366&5V\VWHPDPS
YDFED\
x $//(1%5$'/(<0&&
x $//(1%5$'/(<6ZLWFK*HDU
x ,365RWDU\7RUTXH$PS,QGLFDWRU
x 15/¶HPHUJHQF\ULJH[LWOLJKWLQJ
+DQGOLQJ(TXLSPHQW
(OHYDWRUV
x ±0:7$WXELQJHOHYDWRUWRQ´
x ±0:0$$WXELQJHOHYDWRUWRQ´
x ±0:<7VOLSW\SHWXELQJHOHYDWRUWRQFDSDFLW\ZLWKVOLSDVVHPEOLHV
´±´
6OLSV
x ±&$9,160RGHO)OEVDLURSHUDWHGVOLSDQGVSLGHU´WR´
x ±0:URWDU\VOLSV´;´´;´
x ±9$5&2VDIHW\FODPSV
7RQJV
x ±)2/(<7\SH5RWDU\7RQJVZLWK-DZVIURP´WR´
IWOEVWRUTXHUDWHG
x 9$5&266:GULOOSLSHVSLQQHU
x ±(&.(/0RGHO´+696WXELQJWRQJZLWKK\GUDXOLFEDFNXS
FDSDFLW\´WR´PD[LPXPWRUTXH±IWOEV
+\GUDXOLF&DWKHDGV
x ±75,6(59,&(8QLYHUVDO&REUDKHDGVWRQVRUVLPLODUZLWKSXOO
FDSDFLW\WRPDNHXSDQGEUHDNRXW´´DQG´GULOOSLSH
FRQQHFWLRQV
:LQWHUL]LQJDQG+HDWLQJ
x ±&/($9(5%522.6ERLOHUVKSZLWKEORZGRZQWDQN
x ±',&.6DLUKHDWHUPP%78
125',&&$/,67$
5,*,19(1725<
x ±5RXJKQHFNKHDWH[FKDQJHUV
x ±*O\FROKHDWUHFRYHU\V\VWHP
x &RPSOHWHO\ZLQWHUL]HGIRUDUFWLFZLQWHUFRQGLWLRQV
9HKLFOHV
x ±&UHZ9DQ±5LJ0DQDJHU¶V7UXFN
x ±/RDGHU&$7ORDGHURUHTXLYDOHQWZLWKIRUNVH[WHQVLRQVVQRZ
EXFNHWDQGVWLQJHU
6SLOO&RQWDLQPHQW
x $OOPRWRUVDQGK\GUDXOLFXQLWVHTXLSSHGZLWKRLOFDWFKSDQVGULSWUD\V
0RYLQJ6\VWHP
1RUGLF&DOLVWD5LJLVDVLQJOHPRGXOHVHOISURSHOOHGXQLWFDSDEOHRIPRYLQJDWPLOHVSHUKRXU
3DGWR3DG0RYHPLOHPRYHJHQHUDOO\WDNHVKRXUVIURPULJUHOHDVHWRULJDFFHSW
:HOOWR:HOO0RYHWLPHVDPHSDGDYHUDJHWLPHLVKRXUV
7KHPRYLQJV\VWHPFRQVLVWVRI
x ±;WLHVDQGD[OHVZLWK´;´K\GUDXOLFMDFNVDOOGULYLQJDQGVWHHULQJ
x ;5VXSSRUWWLHVZLWK±´;´K\GUDXOLFMDFNVLQDERRVWHUV\VWHP%RRVWHUWLUHVDUH
IROORZLQJWKHPDLQWLHVZKLOHEHLQJVWHHUHG
x &DSDEOHRIPRYLQJZHOOWRZHOORQWKHVDPHSDGZLWKRIGULOOSLSHRUWXELQJUDFNHGLQWKHGHUULFN
1RWHGXULQJIUR]HQSDGFRQGLWLRQVRQO\
x &DSDEOHRIPRYLQJSDGWRSDGZLWKWKH´%23UDFNHGEDFNLQFHOODU%23QRUPDOO\UHPRYHGIRU
VXPPHUPRYHV
x 5LJPRGXOHZHLJKWLVOEVZLWKDJURXQGORDGLQJRIDSSUR[LPDWHO\SVL
6(&7,21
,1)250$7,2121
'5,//,1*+$=$5'6
6(&7,21D
2))6(7:(//
23(5$7,21$/6800$5,(6
2IIVHW:HOO2SHUDWLRQDO6XPPDULHV
6XPPDU\RIILQGLQJV7KHUHZDVQRHYLGHQFHRIJDVLQDQ\RIWKHVXUIDFHKROHVH[DPLQHGRWKHUWKDQWR
XQLWVRIEDFNJURXQGJDVUHFRUGHGRQ$OFRUEHORZ¶0'1RNLFNVLQVXUIDFHKROHVZHUHUHSRUWHG
0XGZHLJKWVYDULHGIURPSSJWRSSJ0RVWRIWKHZHOOVH[SHULHQFHGWURXEOHLQFHPHQWLQJFDVLQJ
WRVXUIDFHSULPDULO\GXHWRORQJRSHQKROHH[SRVXUHEHIRUHUXQQLQJFDVLQJ6XUIDFHKROHFDVLQJVHWWLQJ
GHSWKVYDULHGIURPIW.DGOHURVKLOLN8QLWWRIW+HPL6SULQJV7KHDYHUDJHVXUIDFH
FDVLQJVHWWLQJGHSWKIRUDOOWKHRIIVHWVVWXGLHGLV¶
$OFRUUHFRUGHGDJDVVSLNHRIXQLWVLQDFRDOOD\HUDW¶0'+HPL6SULQJVUHFRUGHGWKHILUVW
JDVVKRZVRQWKHPXGORJDWIW6HTXRLDHQFRXQWHUHGWKHILUVWJDVVKRZEHWZHHQDQG
IW
$OFRU
´FRQGXFWRUVHWDWIW
ó´VXUIDFHKROHGULOOHGZLWK±SSJPXGZHLJKW´FDVLQJZDVVHWDW¶DQG
FHPHQWHGWRVXUIDFHZLWKEEOVOHDGDQGEEOVWDLOFHPHQW´FDVLQJZDVVHWDW¶0'
WRLVRODWHORVWFLUFXODWLRQ]RQHVDERYHWKH+5=$OFRUZDVFRUHGLQWKH+5=.LQJDNDQG
6KXEOLN$ò´OLQHUZDVVHWIURPDGHSWKRIWRLQ´KROH%DFNJURXQGJDVZDV
VHHQZKLOHGULOOLQJVKDOHV7KHOLQHUZDVFHPHQWHGIURPZLWKEEOFODVV*FHPHQW
$ONDLG
´FRQGXFWRUVHWWR¶
´VXUIDFHKROHGULOOHGWR¶ZLWKSSJPXGô´FDVLQJVHWWR¶/HDG
FHPHQWEEOSHUPDIURVWFHPHQWFHPHQW6HFRQGVWDJHEEOSHUPDIURVW
FHPHQWZLWKEEORISSJWDLO'ULOOHG´KROHWR7'DWô´FDVLQJVHWWR7'
&HPHQWHGZLWKEEORISSJFHPHQW6HFRQGVWDJHZDVEEORISSJFHPHQW
0HUDN
´FRQGXFWRUVHWDWIW
´VXUIDFHKROHGULOOHGZLWK±SSJPXGZHLJKW´FDVLQJZDVVHWDW¶DQG
FHPHQWHGWRVXUIDFHZLWKEEOVOHDGDQGEEOVWDLOFHPHQW´FDVLQJZDVVHWDW¶
0'WRLVRODWHORVWFLUFXODWLRQ]RQHVDERYHWKH+XHVKDOH7KH´FDVLQJZDVFHPHQWHGLQ
ó´KROHZLWKEEOSSJOHDGVOXUU\DQGEEORISSJFODVV*WDLO$VHFRQGVWDJH
SXPSHGEEORISSJFODVV*FHPHQWò´KROHGULOOHGWRZLWKFRUHVFXWLQWKH
6KXEOLN7KHKROHZDVORJJHGLQWKH6KXEOLNDQGSOXJJHGEDFNWR´FDVLQJVKRH
3LSHOLQH6WDWHZDVGULOOHGE\$UFRLQWRDGHSWKRIIW
´&RQGXFWRUDWIW
ó´VXUIDFHKROHGULOOHGZLWKSSJPXGZHLJKW´FDVLQJVHWDWIWSSJ),7
3XPSHGWLPHVFDOFXODWHGYROXPHEXWFHPHQWGLGQRWUHDFKVXUIDFH3HUIRUPHGWRSMRE
$WIWIWDERYH+XH6KDOHSSJPXGZDVFXWWRSSJDQGZDVVWDELOL]HGZLWK
SSJ/RVWFLUFXODWLRQLQ*5=3HEEOH6KDOHZLWKSSJPXG3 $ZHOO
.DGOHURVKLOLN8QLWZDVGULOOHGE\0RELOLQWRDGHSWKRIIW
´&RQGXFWRUDWIW
ò´KROHWRIWGULOOHGZLWKXQNQRZQPXGZHLJKW´FDVLQJVHWDWIW
VQRHYLGHQFHRIJDVLQDQ\RIWKHVXUIDFHKROHVH[DPLQHG
1RNLFNVLQVXUIDFHKROHVZHUHUHSRUWHG
ORVWFLUFXODWLRQ]RQHVDERYHWKH+XHVKDOH
/RVWFLUFXODWLRQLQ*5=3HEEOH6KDOHZLWKSSJPXGPP
J
%DFNJURXQGJDVZDV
VHHQZKLOHGULOOLQJVKDOHV
S SM
$WIWIWDERYH+XH6KDOHSSJPXGZDVFXWWRSSJDQGZDVVWDELOL]HGZLWK SSJ SS
SSJ
ó´KROHGULOOHGWRIWZLWKORVWFLUFUHSRUWHGDWIW1RPXGZHLJKWVJLYHQ
5DQORJVDQGVLGHZDOOFRUHV5DQ´FDVLQJWRIWDQGFHPHQWHGZLWKRXWUHWXUQV
'ULOOHGò´KROHWRIWUDQORJVDQGVLGHZDOOFRUHV'ULOOHGDKHDGWR7'DWIW
5DQORJVDQGVLGHZDOOFRUHV3OXJEDFNRSHQKROHWRIW
5DQ´FDVLQJWRIW&RXOGQRWFLUFXODWH´3HUI´DERYHIORDWFROODUDQGVTXHH]HGFHPHQW
ZLWKRXWUHWXUQV5DQWZR'67¶VZLWKQRIOXLGWRVXUIDFH$EDQGRQHGZHOO
6HTXRLDZDVGULOOHGE\&RQRFRLQWRDGHSWKRIIW
´&RQGXFWRUDWIW
´KROHGULOOHGWRIWZLWKXQNQRZQPXGZHLJKW5DQORJVDQGVLGHZDOOFRUHV
´FDVLQJWRIW&HPHQWHGZLWKWLPHVFDOFXODWHGYROXPHZLWKRXWVXUIDFHUHWXUQV
3HUIRUPHGWRSMRE'ULOOHGRXWDQGFRQGXFWHG/27WRSSJ(0:
'ULOOHG´KROHWRIW0XGORJLQGLFDWHGJDVVKRZEHWZHHQDQGIW1R
IXUWKHUVKRZVZHUHVHHQXQWLOZHOOIORZZDVGHWHFWHGEHWZHHQDQG/&8)ORZZDV
FRQWUROOHGE\ZHLJKWLQJXSWRSSJ'ULOOLQJFRQWLQXHGZLWKORVVHVDQGVZDEELQJ/RJVZHUH
UXQDQGWKHZHOOZDVDEDQGRQHG
)UDQNOLQ%OXIIV8QLWZDVGULOOHGZDVGULOOHGE\$UFRLQWRDGHSWKRIIW
´&RQGXFWRUDWIW
ó´KROHZDVGULOOHGWRIWDQGORJVZHUHUXQ0XGZHLJKWXQNQRZQ
´FDVLQJZDVUXQWRDQGFHPHQWHGZLWKUHWXUQVWRVXUIDFH),7WRSSJ
ò´KROHZDVGULOOHGWR7'DWIWDQGORJJHG:HOOZDVDEDQGRQHG
)UDQNOLQ%OXIIVZDVGULOOHGE\WKH%/0LQWRDGHSWKRIIW
´&RQGXFWRUDWIW
'ULOOHG´KROHWRIWDQGFHPHQWHG´FDVLQJ
'ULOOHGDQGFRUHGZLWKXQNQRZQELWVL]HWRIW0XGZHLJKWUDQJHGIURPWRSSJ
7ZLVWRIIRFFXUUHGDWIWZKLOHGULOOLQJDWIW)LVKLQJXQVXFFHVVIXO$EDQGRQHGZHOO
7KH%/0ZDVLQVHDUFKRIFRDORUFRDOJDV1RJDVVKRZVZHUHUHSRUWHG
-DFRE¶V/DGGHUZDVGULOOHGE\$QDGDUNR7KHZHOOUHDFKHGIWLQWKHVHDVRQDQG
FRQWLQXHGWRIWLQWKHVHDVRQ
´&RQGXFWRUVHWDWIW
´KROHZDVGULOOHGWRZLWKWRSSJPXGZHLJKW7LJKWKROHIURPWRIW
´FDVLQJFHPHQWHGZLWKWLPHVFDOFXODWHGYROXPHZLWKQRFHPHQWWRVXUIDFH3HUIRUPHG
WZRWRSMREV5LJIUHH]HXSSUREOHPVFRQWULEXWHGWRGHOD\VDQGFHPHQWLQJGLIILFXOWLHV
'ULOOHGRXWRI´ZLWKó´ELWDQGUDQ),7WRSSJ(0:
'ULOOHGWRWRS.DYLNORJJHGZHOODQGUDQDQGFHPHQWHG´FDVLQJWR0'
79'0XGZHLJKWLQó´KROHZDVSSJ'ULOOHGVKRHDQGUDQ),7WRSSJ(0:
'ULOOHGLQWR/LVEXUQHWR0'RIIW2SHQKROHZDVSOXJJHGDQGZHOOVXVSHQGHGIRUVHDVRQ
,QZHOOZDVUHHQWHUHGIRUIXUWKHU/LVEXUQHWHVWLQJ:HOOZDVDEDQGRQHGRQ
/DNH)HGZDVGULOOHGE\6KHOOLQWRDGHSWKRIIW
´&RQGXFWRUDWIW
JJ
OZHOOIORZZDVGHWHFWHGEHWZHHQDQG/&8
KORVWFLUFUHSRUWHGDWIW
FRQWUROOHGE\ZHLJKWLQJXSWRSSJ
)ORZZDV
´FDVLQJDWIW
´KROHGULOOHGWRIWWKHQRSHQHGWRò´0XGZHLJKWWRSSJZLWKQRUHSRUW
RIJDVIORZRUORVVHV5DQ´FDVLQJWRDQGFHPHQWHG2SHQHG'9WRRODWIW
DQGSXPSHGWLPHVFDOFXODWHGYROXPHRIFHPHQWQHHGHGZLWKRXWJHWWLQJFHPHQWWRVXUIDFH
3HUIRUPHGWRSMRELQ´[´DQQXOXV
ó´KROHZDVGULOOHGWRIWZLWKSSJPXG/RJJHGZHOODQGUDQ´FDVLQJWR
IW'ULOOHGò´KROHWRIWDQGUDQORJV&RQWLQXHGGULOOLQJò´KROHZLWK
SSJPXGWRIWZLWKWRSSJPXG0DGHRQHFRUHUXQORJJHGZHOODQGUHVXPHG
GULOOLQJWR7'DWIW0'/RJJHGZHOO
$EDQGRQHGZHOORQ2FW1RUHSRUWRIIORZRUORVVHVRQWKLVZHOO
+HPL6SULQJV8QLWZDVGULOOHGE\$UFRLQWRDGHSWKRIIWDVDWHVWRIWKH.XXSDUXN
´&RQGXFWRUDWIW
ó´KROHZDVGULOOHGZLWKSSJPXGWRIW6XUIDFHKROHZDVORJJHGDQG´
FDVLQJUXQDQGFHPHQWHGWRIW&HPHQWHGZLWKVNV3HUPDIURVW(VNV&ODVV*
3HUIRUPHGWRSMREZLWKVNV3HUPDIURVW&'ULOOHGRXWDQGSHUIRUPHG/27WRSSJ
ò´KROHZDVGULOOHGZLWK:%0,QLWLDOPXGZHLJKWRISSJZDVXVHGWRDGHSWKRIIW
0XGZHLJKWZDVLQFUHDVHGWRSSJE\IWWKHQWRSSJZKHQFRULQJEHJDQDWIW
%\IWWKHPXGZHLJKWZDVLQFUHDVHGWRSSJWRFRQWUROVKDOH
:HOOZDVDEDQGRQHG
7KHPXGORJRQ+HPL6SULQJVVKRZVQRVLJQRIJDVXQWLODYHU\VPDOOVKRZDSSHDUHGDW
IW*DVVKRZVEHJDQWRLQFUHDVHEHORZIW&RULQJRIWKH.XSDUXNIRUPDWLRQEHJDQDW¶
7RROLN)HGHUDOZDVGULOOHGE\$UFRLQWRDGHSWKRI¶
´FRQGXFWRUVHWDWIWDQGFHPHQWHGZLWKVNV)RQGXFHPHQW5HWXUQVWRVXUIDFH$´
GLYHUWHUZDVLQVWDOOHGRQWKH´FDVLQJ
´VHWDWIWDQGFHPHQWHGLQVWHSV6WDJHVNV&ODVV*
6WDJHVNV)RQGXYLD'9WRROQRVXUIDFH
UHWXUQV
6WDJH7RSMREZLWKVNV)RQGX
7KH´VXUIDFHZDVSODQQHGWRJRWRIWEXWKROHSUREOHPVDQGVWXFNSLSHFDXVHGFDVLQJ
WREHVHWHDUO\%23¶VZHUHLQVWDOOHGRQWKH´FDVLQJ
´FDVLQJZDVVHWDWIWGXHWRVWLFN\KROH7KLVFDVLQJKDGEHHQSODQQHGIRUIW
´ZDVFHPHQWHGZLWKVNV&ODVV*ZLWKQRVXUIDFHFHPHQWUHWXUQV
ò´KROHZDVGULOOHGDQGFRUHGWR¶
)LUVW³VKRZ´RQPXGORJZDVDWIW
5HSRUWVVD\WKDW³QRFRPPHUFLDODFFXPXODWLRQVRIK\GURFDUERQVZHUHHQFRXQWHUHG´
$2*&&YLVLWHGRQ0DUFKZKLOHGULOOLQJDWIW2SHUDWRUUHSRUWHGWKDWWKHZHOOKDG
H[SHULHQFHGQRORVWFLUFXODWLRQDQGQRDEQRUPDOSUHVVXUH
7KHRQO\PXGZHLJKWJLYHQZDVSSJMXVWSULRUWRWKH3 $
:HOOZDV3 $¶G$SULO
7RROLN)HGHUDOZDVGULOOHGE\$UFRLQWRDGHSWKRI¶
´FRQGXFWRUVHWLQ´KROHDW¶DQGFHPHQWHGZLWKVNV)RQGX)O\$VKFHPHQW
5HWXUQVWRVXUIDFH18%23(RQ´
SM
WKROHSUREOHPVDQGVWXFNSLSHFDXVHGFDVLQJ
WREHVHWHDUO\
%\IWWKHPXGZHLJKWZDVLQFUHDVHGWRSSJWRFRQWUROVKDOH
*DVVKRZVEHJDQWRLQFUHDVHEHORZIW
´FDVLQJZDVVHWLQ´KROHDW¶DQGFHPHQWHGZLWKVNV)RQGX)O\$VKZLWKQR
UHWXUQVWRVXUIDFH3XPSHGVNWRSMRE
´FDVLQJZDVVHWLQ´KROHDW¶DQGFHPHQWHGZLWKVNV)RQGXDQGVNV)RQGX
)O\$VK*RRGUHWXUQVWRVXUIDFH
:HOOZDVGULOOHGWR7'ZLWK´ELWV:HOOZDVORJJHGZLWKZLUHOLQHWKHQDEDQGRQHG
:ROIEXWWRQZDVGULOOHGE\7H[DFRLQ
´&RQGXFWRUZDVVHWDW¶DQGFHPHQWHGZLWK\GV3HUPDIURVWFHPHQW
ò´KROHZDVGULOOHGWRIWDQGORJJHGQRPXGZHLJKWJLYHQ
´FDVLQJZDVUXQWRDQGFHPHQWHGZLWKFXIW3HUPDIURVWFHPHQW3HUIRUPHG
FXIWWRSMREZLWK3HUPDIURVWFHPHQW
'ULOOHGó´KROHWRIWDQGUDQ/27WRSSJ(0:SSJPXGZSVLVXUIDFH
'ULOOHGó´KROHWR¶ZKHUHPXGZDVFXWWRSSJ'ULOOHGWRZKLOHLQFUHDVLQJ
PXGZHLJKWWRSSJZKHUHORVVHVEHJDQ5HGXFHGZHLJKWWRSSJDQGGULOOHGWR7'DW
¶:HOOZDVORJJHGDQG3 $
'ULOOHGó´KROHWR¶ZKHUHPXGZDVFXWWRSSJ'ULOOHGWRZKLOHLQFUHDVLQJ
PXGZHLJKWWRSSJZKHUHORVVHVEHJDQ5HGXFHGZHLJKWWRSSJDQGGULOOHGWR7'DW
¶
6(&7,21E
2))6(7:(//352%/(0
6800$5<635($'6+((7
7DOLWKD$ 3LSHOLQH6WDWH DGOHURVKLOL 8QLW 6HTXRLD DFR
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
SSJ LQ LQJDN6KDOH
SSJPXGPXG3UHVVXUHLQOR HU+5= XSDUXNSSJH XLYDOHQW /RVWFLUF KLOH3 $LQJ HOOWKLHI RQH /RVWFLUFDW
0:XQNQR QDERYH
SSJPXG/RVWFLUFDW
0:XQNQR Q:HOOIOR HGDW
0: 7LJKWKROH
7LJKWKROH
ORVW%+$67 HOO/D H )HGHUDO +HPL6SULQJV 7RROL )HGHUDO $OFRU $O DLG6ORXJKLQJKROHDQGVWXFNSLSHLQVXUIDFHKROH1RFHPHQWWRVXUIDFHLQVXUIDFHKROH 1RFHPHQWWRVXUIDFHLQVXUIDFHKROH 1RFHPHQWWRVXUIDFHLQVXUIDFHKROH7RWDOSXPSHG;FDOFXODWHGYRO 7RWDOSXPSHG;FDOFXODWHGYRO 7RWDOSXPSHG;FDOFXODWHGYROGD\VVSHQWIURPVSXGWRFHPHQWLQJ GD\VVSHQWIURPVSXGWRFHPHQWLQJ GD\VVSHQWIURPVSXGWRFHPHQWLQJ6ORXJKLQJKROHIVXUIFVJVKRHWR
)OXLGORVVVHHQDW
)OXLGORVVVHHQDW7'5DLVHG0:ISSJDW
WRSSJDW
WRFRQWUROVKDOH6WXFNSLSHW LFHEHOR
6WXFN'3DW
&RQWLQXHGIOXLGORVVVHHQDW
LWK SSJPXG&RQWLQXHGIOXLGORVVVHHQWKURXJKRXWEURRNLDQVHFWLRQDWSSJPXG7KHWD:HVW2IIVHW:HOO3UR OHP6XPPDU\:HOOIOR HGDW
0: :KLOHGULOOLQJ.XSDUXN0LOXYHDFKVHFWLRQRIZHOO6)'7DOLWKD$3LORW+ROH(OHYDWHGJDVUHDGLQJVUHDFKLQJXQLWVREVHUYHGZKLOHGULOOLQJ6HDEHH+XHXQGLIIHUHQWLDWHGEDVLQIORRUIDQVHGLPHQWVXVLQJSSJPXG(OHYDWHGJDVUHDGLQJVUHDFKLQJXQLWVHQFRXQWHUHGZKLOHGULOOLQJ.XSDUXNZLWKSSJPXG6)'*DVFXWPXG XVWDERYH+XH6KDOH
6(&7,21F
7+(7$:(67'5,//,1*
5,6.6',6&866,21
7+(7$:(67'5,//,1*5,6.6
7KHKLVWRULHVRIRIIVHWWLQJSUHYLRXVO\GULOOHGZHOOVZHUHFORVHO\H[DPLQHGWRLGHQWLI\GULOOLQJULVNVDQG
SRWHQWLDOSUREOHPVLQWKH7KHWD:HVWZHOO7KHRIIVHWWLQJZHOOVH[DPLQHGDUH
7DOLWKD$
$UFR3LSHOLQH6WDWH
0RELO.DGOHURVKLOLN
&RQRFR6HTXRLD
$UFR1RUWK)UDQNOLQ%OXIIV
%/0)UDQNOLQ%OXIIV
$QDGDUNR-DFRE¶V/DGGHU&
6KHOO/DNH)HGHUDO
+HPL6SULQJV8QLW
+HPL6SULQJV6DJ5LYHU
7RROLN)HGHUDO
:ROIEXWWRQ
$OFRU
0HUDN
$ONDLG
%DVHGRQWKHSUREOHPVIRXQGLQWKHGULOOLQJUHFRUGVIRUWKHVHZHOOVWKHLGHQWLILHGGULOOLQJULVNVIRUWKH
7KHWD:HVWZHOOVDUHGLYLGHGLQWR+LJK3UREDELOLW\0RGHUDWH3UREDELOLW\DQG/RZ3UREDELOLW\FDWHJRULHV
DVGLVFXVVHGEHORZ
+LJK3UREDELOLW\
1R&HPHQWWR6XUIDFH:KHQ&HPHQWLQJ6XUIDFH&DVLQJ
7KHPDMRULW\RIIVHWWLQJZHOOVIDLOHGWREULQJFHPHQWWRVXUIDFHGXULQJWKHSULPDU\FHPHQWLQJMRERQWKH
VXUIDFHFDVLQJ&HPHQWYROXPHVXOWLPDWHO\XVHGRQWKHVHZHOOVLQFOXGLQJWRSMREVYDULHGIURPWR
WLPHVWKHYROXPHFDOFXODWHGIRUDQLQJDXJHKROH
,WKDVORQJEHHQNQRZQWKDWH[FHVVLYHFLUFXODWLRQPXOWLSOHWULSVDQGHOHYDWHGPXGWHPSHUDWXUHVOHDGWR
GUDPDWLFKROHHQODUJHPHQWLQWKHSHUPDIURVWLQWHUYDO$QH[DPLQDWLRQLQDOOWKHRIIVHWZHOOVRIWKHWLPH
LQWHUYDOEHWZHHQVSXGDQGSXPSLQJVXUIDFHFDVLQJFHPHQWUHYHDOVDURXJKO\OLQHDUUHODWLRQVKLSEHWZHHQ
WKDWWLPHDQGWKHDPRXQWRIH[FHVVFHPHQWHDFKZHOOUHTXLUHGLHWKHORQJHUWKHKROHLVRSHQWKHKLJKHU
WKHSHUFHQWH[FHVVFHPHQWLVUHTXLUHG
7KHH[FHVVFHPHQWSODQQHGWREHSXPSHGLQWKH*UHDW%HDUZHOOVLVEDVHGRQWKHDQWLFLSDWHGQXPEHURI
GD\VEHWZHHQVSXGDQGSXPSLQJFHPHQW+RZHYHUWKHYROXPHZLOOEHDGMXVWHGEHIRUHFHPHQWLQJWRWDNH
LQWRDFFRXQWWKHDFWXDORSHQKROHWLPH
)RUIXUWKHUDVVXUDQFHWKDWFHPHQWZLOOEHEURXJKWWRVXUIDFHWKHVXUIDFHFDVLQJLQDOORIWKH*UHDW%HDU
ZHOOVZLOOFRQWDLQDSRUWFROODUSODFHGDW¶IRUXVHLIWKHSULPDU\FHPHQWMREIDLOVWRUHDFKWKHVXUIDFH
$QLQQHUVWULQJFHPHQWGHVLJQZLOOEHXVHGWRDOORZDTXLFNHUUHVSRQVHWRFHPHQWUHWXUQV
JJ
7KHPDMRULW\RIIVHWWLQJZHOOVIDLOHGWREULQJFHPHQWWRVXUIDFHGXULQJWKHSULPDU\FHPHQWLQJMRERQWKHM\
VXUIDFHFDVLQJ&
6KDOH,QVWDELOLW\
7KH7DOLWKD$ZHOOH[SHULHQFHGSUREOHPVZLWKVZHOOLQJDQGPXVK\FOD\V7KLVUHVXOWHGLQSDFNLQJRII
LQDELOLW\IRUGLUHFWLRQDOVWHHULQJDQGPLQRUVWLFNLQJRISLSH7KHQH[WWZRQHDUHVWRIIVHWZHOOVWRWKH*UHDW
%HDUGULOOLQJORFDWLRQV3LSHOLQH6WDWHDQG6HTXRLDHDFKH[SHULHQFHGVLPXOWDQHRXVORVWUHWXUQV
IORZLQJ FRQGLWLRQV DQG UDSLG ZHOOERUH GHWHULRUDWLRQ UHVXOWLQJ LQ SDFNLQJ RII DQG VZDEELQJ LQ WKH
+5=3HEEOH6KDOHDW¶LQWKH3LSHOLQH6WDWHDQG.LQJDN6KDOHDW¶LQWKH6HTXRLD
7KHUHDUHNQRZQZHOOERUHLQVWDELOLW\SUREOHPVDVVRFLDWHGZLWKWKH+5=DQG.LQJDNVKDOHVLQZHOOV
GULOOHGDFURVVWKHGHYHORSHG1RUWK6ORSH6RPHRIWKHIDFWRUVFRQWULEXWLQJWRKROHLQVWDELOLW\LQWKHVH
VKDOHVDUHLQVXIILFLHQWPXGZHLJKWKLJKGHYLDWLRQDQGZHOOERUHD]LPXWK*HQHUDOO\WKH.LQJDNVKDOHV
H[KLELWKLJKHUULVNDQGVHYHULW\WKDQWKHVKDOORZHU+5=
3XEOLVKHG VWXGLHV RI WKHVH WZR WURXEOHVRPH VKDOHV LQFOXGH VWDELOLW\ GLDJUDPV WKDW UHODWH KROH DQJOH
D]LPXWKDQGRSWLPXPPXGZHLJKWIRUNHHSLQJWKHVKDOHVDVVWDEOHDVSRVVLEOH*UHDW%HDUCVLQLWLDOZHOOV
ZLOOEHYHUWLFDOKROHVVRPXGZHLJKWLVWKHRQO\FRQWUROODEOHYDULDEOH
,QJHQHUDOWKH7KHWD:HVWZHOOZLOOVWD\DERYHWKH+5=DQGVLJQLILFDQWFOD\LVVXHV1RQHWKHOHVVWKHUHLV
SRWHQWLDOWRHQFRXQWHUVZHOOLQJLQWKHEURRNLDQLQWHUYDO0XGZHLJKWRSHQKROHH[SRVXUHWLPHDQGLRQLF
FOD\VWDELOL]DWLRQZLOOEHXVHGWRSUHYHQWFRPSOLFDWLRQV
0RGHUDWH3UREDELOLW\
/RVVRI&LUFXODWLRQ
7KUHHRIWKHRIIVHWZHOOVH[SHULHQFHGPLQRUORVVHVRIFLUFXODWLRQDWYDU\LQJGHSWKV0RVWRIWKHPXG
ZHLJKWVEHLQJXVHGDWWKHVHWLPHVLVXQUHFRUGHG
7RPLQLPL]HWKLVDVDSRWHQWLDOSUREOHPWKHSODQQHGPXGZHLJKWFXUYHZLOOEHDGKHUHGWRXQOHVVKROH
FRQGLWLRQVGLFWDWHRWKHUZLVH/LJKWHUPXGVZHUHXVHGWRGULOOWKH7DOLWKD$ZHOOZLWKJUHDWVXFFHVV
7LJKW+ROH
7KHPDMRULW\RIWKHJHRORJLFFROXPQWREHGULOOHGEHORZWKHVXUIDFHFDVLQJVKRHFRQVLVWVRIVORZO\ZDWHU
UHDFWLYHVKDOHV7KHVHVKDOHVK\GUDWHDQGVZHOOZLWKWLPHUHTXLULQJRFFDVLRQDODWWHQWLRQDQGSRWHQWLDOO\
ZLSLQJRIWKHKROHYLDVKRUWRUURXQGWULSV
7KHRQO\RIIVHWZHOOVWKDWH[SHULHQFHGWLJKWKROHSUREOHPVQRWDEO\-DFRE¶V/DGGHU&ZHUHWKRVHLQ
ZKLFKWKHRSHUDWRUZDLWHGWRRORQJEHWZHHQZLSHURUURXQGWULSV7KLVZDVDOVRDSSDUHQWLQWKHERWWRP
VHFWLRQRIWKH7DOLWKD$ZHOO
/RZ3UREDELOLW\
*DV+\GUDWHV
0HWKDQHK\GUDWHVZLWKLQWKHSHUPDIURVWLQWHUYDOKDYHEHHQHQFRXQWHUHGLQYDULRXVORFDWLRQVVRXWKDQG
ZHVW RI WKH .XSDUXN 5LYHU )LHOG ZKHUH WKH\ FDQ EH WURXEOHVRPHUHGXFLQJ K\GURVWDWLF FROXPQV DQG
LQGXFLQJZHOONLFNV+\GUDWHVZHUHQRWUHFRUGHGLQDQ\RIWKHZHOOVRIIVHWWLQJWKH*UHDW%HDUORFDWLRQV
DORQJWKH6DJ5LYHUDQGQRQHDUHH[SHFWHGLQWKHZHOOVWREHGULOOHGWKHUH+RZHYHUWKHUHUHPDLQVD
UHPRWHSRVVLELOLW\RIHQFRXQWHULQJK\GUDWHVDQGFDXWLRQZLOOEHH[HUFLVHG
J J S S
3LSHOLQH6WDWHDQG6HTXRLDHDFKH[SHULHQFHGVLPXOWDQHRXVORVWUHWXUQVJS TS
IORZLQJ FRQGLWLRQV DQG UDSLG ZHOOERUH GHWHULRUDWLRQ UHVXOWLQJLQ SDFNLQJ RII DQG VZDEELQJ LQ WKHJS JSJ J
+5=3HEEOH6KDOHDW¶LQWKH3LSHOLQH6WDWHDQG.LQJDN6KDOHDW¶LQWKH6HTXRLD
PLQRUORVVHVRIFLUFXODWLRQDWYDU\LQJGHSWKV
\J\
+\GUDWHVZHUHQRWUHFRUGHGLQDQ\RIWKHZHOOVRIIVHWWLQJWKH*UHDW%HDUORFDWLRQVJ\ \J
DORQJWKH6DJ5LYHUDQGQRQHDUHH[SHFWHGLQWKHZHOOVWREHGULOOHGWKHUH+
J
*UHDW%HDUCVLQLWLDOZHOOVSJSJS
ZLOOEHYHUWLFDOKROHVVRPXGZHLJKWLVWKHRQO\FRQWUROODEOHYDULDEOH
NQRZQZHOOERUHLQVWDELOLW\SUREOHPVDVVRFLDWHGZLWKWKH+5=DQG.LQJDNVKDOHV
,QJHQHUDOWKH7KHWD:HVWZHOOZLOOVWD\DERYHWKH+5=DQGVLJQLILFDQWFOD\LVVXHV
6(&7,21
/($.2))7(67
352&('85(
/HDNRIIWHVWSURFHGXUH
'ULOORXWQHZIRUPDWLRQIHHWFLUFXODWHERWWRPXSDQGFROOHFWVDPSOHWRFRQILUPWKDWQHZ
IRUPDWLRQLVGULOOHGWRDQGWKHQSXOOVWULQJLQWRWKHFDVLQJ
&ORVHDQQXODUSUHYHQWHURUSLSHUDPVOLQHXSDSXPSQRUPDOO\DFHPHQWSXPSDQG
FLUFXODWHWKURXJKDQRSHQFKRNHOLQHWRHQVXUHWKDWVXUIDFHOLQHLVIXOO\ILOOHGZLWKGULOOLQJIOXLG
6WRSWKHSXPSDQGFORVHDFKRNHYDOYH
*UDGXDOO\SXPSVPDOODPRXQWRIGULOOLQJIOXLGLQWRZHOOZLWKFRQVWDQWSXPSVWURNH5HFRUG
WRWDOSXPSVWURNHVGULOOSLSHSUHVVXUHDQGFDVLQJSUHVVXUH'ULOOSLSHSUHVVXUHDQGFDVLQJSUHVVXUH
ZLOOEHLQFUHDVHGFRQWLQXDOO\ZKLOHSXPSLQJPXGLQKROH:KHQSORWDJUDSKEHWZHHQVWURNHV
SXPSHG DQG SUHVVXUH LI IRUPDWLRQ LV QRW EURNHQ D JUDSK ZLOO GHPRQVWUDWH VWUDLJKW OLQH
UHODWLRQVKLS:KHQSUHVVXUHH[FHHGVIRUPDWLRQVWUHQJWKIRUPDWLRQZLOOEHEURNHQDQGOHWGULOOLQJ
IOXLGSHUPHDWHLQWRIRUPDWLRQWKHUHIRUHDWUHQGRIGULOOSLSHFDVLQJSUHVVXUHZLOOGHYLDWHIURP
VWUDLJKWOLQHWKDWPHDQIRUPDWLRQLVEURNHQDQGLVLQMHFWHGE\GULOOLQJIOXLG:HPD\FDOOSUHVVXUH
ZKHQGHYLDWHGIURPVWUDLJKWOLQHDVOHDNRIIWHVWSUHVVXUH
%OHHGRIISUHVVXUHDQGRSHQXSWKHZHOO9HULI\UHVXOWVZLWK(QJLQHHULQJ$WWDLQDSSURYDO
WRSURFHHGZLWKGULOOLQJRSHUDWLRQ
6(&7,21
&(0(17,1*$1'&$6,1*
352*5$06
6(&7,21D
7+(7$:(67&$6,1*
'(6,*1&$/&8/$7,216
ĂƐŝŶŐĞƐŝŐŶĂůĐƵůĂƚŝŽŶƐdŚĞƚĂtĞƐƚ^ƵƌĨĂĐĞĂƐŝŶŐƵƌƐƚ ŽůůĂƉƐĞ dĞŶƐŝŽŶĞƉƚŚŽĨŶĞdžƚŚŽůĞϵϱϬϬĨƚ ĞƉƚŚŽĨ,ŽůĞϯϱϬϬĨƚ ĞƉƚŚŽĨ,ŽůĞ ϯ͕ϱϬϬ ĨƚWƌĞƐƐƵƌĞŐƌĂĚŝĞŶƚĨŽƌŶĞdžƚŚŽůĞϬ͘ϰϱƉƐŝͬĨƚ WƌĞƐƐƵƌĞŐƌĂĚŝĞŶƚϬ͘ϰϱƉƐŝͬĨƚ tĞŝŐŚƚŽĨĂƐŝŶŐ ϰϬ ůďƐͬĨƚ,WŽĨŶĞdžƚŚŽůĞ ϰϮϳϱ ƉƐŝ ,W ϭϱϳϱ ƉƐŝ ƌLJƐƚƌŝŶŐǁĞŝŐŚƚ ϭϰϬ͕ϬϬϬ ůďƐ͘ϭƉƐŝͬĨƚŐĂƐŐƌĂĚŝĞŶƚ ϵϱϬ ƉƐŝ^ƚƌŝŶŐƵŽLJĂŶĐLJĨŽƌĐĞ Ͳϭϳ͕ϴϬϱDĂdžŝŵƵŵŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ ϯϯϮϱ ƉƐŝƵŽLJĞĚƐƚƌŝŶŐǁĞŝŐŚƚ ϭϮϮ͕ϭϵϱĂƐŝŶŐ^ŝnjĞϵϱͬϴĂƐŝŶŐtĞŝŐŚƚϰϬůďͬĨƚĂƐŝŶŐ'ƌĂĚĞ>ͲϴϬĂƐŝŶŐ/ŶƚĞƌŶĂůzŝĞůĚϱ͕ϳϱϬƉƐŝ ĂƐŝŶŐŽůůĂƉƐĞZĂƚŝŶŐϯ͕ϬϵϬƉƐŝ dĞŶƐŝŽŶƌĂƚŝŶŐϳϮϳ͕ϬϬϬůďƐZĂƚŝŶŐĂƐйŽĨD^W ϭϳϯй ZĂƚŝŶŐĂƐйŽĨD,W ϭϵϲй ZĂƚŝŶŐĂƐйŽĨ^ƚƌŝŶŐtĞŝŐŚƚ ϱϭϵйWƌŽĚƵĐƚŝŽŶĂƐŝŶŐƵƌƐƚ ŽůůĂƉƐĞ dĞŶƐŝŽŶĞƉƚŚŽĨŚŽůĞϵ͕ϱϬϬĨƚ ĞƉƚŚŽĨ,ŽůĞϵ͕ϱϬϬĨƚ ĞƉƚŚŽĨ,ŽůĞ ϵ͕ϱϬϬ ĨƚWƌĞƐƐƵƌĞŐƌĂĚŝĞŶƚĨŽƌŚŽůĞϬ͘ϱƉƐŝͬĨƚ WƌĞƐƐƵƌĞŐƌĂĚŝĞŶƚϬ͘ϰϱƉƐŝͬĨƚ tĞŝŐŚƚŽĨĂƐŝŶŐ Ϯϲ ůďƐͬĨƚ,WŽĨŶĞdžƚŚŽůĞ ϰϳϱϬ ƉƐŝ ,W ϰϮϳϱ ƉƐŝ ƌLJƐƚƌŝŶŐǁĞŝŐŚƚ Ϯϰϳ͕ϬϬϬ ůďƐ͘ϭƉƐŝͬĨƚŐĂƐŐƌĂĚŝĞŶƚ ϵϱϬ ƉƐŝ^ƚƌŝŶŐƵŽLJĂŶĐLJĨŽƌĐĞ Ͳϯϭ͕ϰϭϮDĂdžŝŵƵŵŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ ϯϴϬϬ ƉƐŝƵŽLJĞĚƐƚƌŝŶŐǁĞŝŐŚƚ Ϯϭϱ͕ϱϴϴĂƐŝŶŐ^ŝnjĞϳΗĂƐŝŶŐtĞŝŐŚƚϮϲůďͬĨƚĂƐŝŶŐ'ƌĂĚĞWͲϭϭϬĂƐŝŶŐ/ŶƚĞƌŶĂůzŝĞůĚϵ͕ϵϱϬƉƐŝ ĂƐŝŶŐŽůůĂƉƐĞZĂƚŝŶŐϲ͕ϮϯϬƉƐŝ dĞŶƐŝŽŶƌĂƚŝŶŐϲϵϯ͕ϬϬϬůďƐZĂƚŝŶŐĂƐйŽĨD^W ϮϲϮй ZĂƚŝŶŐĂƐйŽĨD,W ϭϰϲй ZĂƚŝŶŐĂƐйŽĨ^ƚƌŝŶŐtĞŝŐŚƚ Ϯϴϭй
6(&7,21E
7+(7$:(67&(0(17
'(6,*1&$/&8/$7,216
x &HPHQW'HVLJQ&DOFV
x ´6XUIDFH&DVLQJ
x ´3URGXFWLRQ&DVLQJ
ĞŵĞŶƚĞƐŝŐŶĂůĐƵůĂƚŝŽŶƐdŚĞƚĂtĞƐƚWƌŽĚƵĐƚŝŽŶĂƐŝŶŐĞŵĞŶƚ,ŽůĞƐŝnjĞϭϮ͘ϮϱŝŶ,ŽůĞƐŝnjĞϭϮ͘ϮϱŝŶ,ŽůĞƐŝnjĞϴ͘ϱŝŶƌĞĂϬ͘ϴϭϴĨƚϮƌĞĂϬ͘ϴϭϴĨƚϮƌĞĂϬ͘ϯϵϰĨƚϮdKϬdKϭϮϬϬdKϲϱϬϬdϭϮϬϬdϯϱϬϬdϵϱϬϬĞŵĞŶƚŽůƵŵŶϭϮϬϬĨƚĞŵĞŶƚŽůƵŵŶϮϯϬϬĨƚĞŵĞŶƚŽůƵŵŶϯϬϬϬĨƚsŽůƵŵĞϵϴϮĨƚϯsŽůƵŵĞϭϴϴϮĨƚϯsŽůƵŵĞϭϭϴϮĨƚϯsŽůƵŵĞϭϳϱďďůsŽůƵŵĞϯϯϲďďůsŽůƵŵĞϮϭϭďďůĂƐŝŶŐ^ŝnjĞϵ͘ϲϮϱŝŶĂƐŝŶŐ^ŝnjĞϵ͘ϲϮϱŝŶĂƐŝŶŐ^ŝnjĞϳŝŶƌĞĂϬ͘ϱϬϱĨƚϮƌĞĂϬ͘ϱϬϱĨƚϮƌĞĂϬ͘ϮϲϳĨƚϮĞƉƚŚϭϮϬϬĨƚĞƉƚŚϮϯϬϬĨƚĞƉƚŚϯϬϬϬĨƚsŽůƵŵĞϲϬϲĨƚϯsŽůƵŵĞϭϭϲϮĨƚϯsŽůƵŵĞϴϬϮĨƚϯsŽůƵŵĞϭϬϴďďůsŽůƵŵĞϮϬϳďďůsŽůƵŵĞϭϰϯďďůŶŶƵůĂƌsŽůƵŵĞϯϳϲĨƚϯŶŶƵůĂƌsŽůƵŵĞϳϮϬĨƚϯŶŶƵůĂƌsŽůƵŵĞϯϴϬĨƚϯŶŶƵůĂƌsŽůƵŵĞϲϳďďůŶŶƵůĂƌsŽůƵŵĞϭϮϴďďůŶŶƵůĂƌsŽůƵŵĞϲϴďďůdžĐĞƐƐϮϱϬйdžĐĞƐƐϱϬйdžĐĞƐƐϰϬйdŽƚĂůϭϯϭϱĨƚϯdŽƚĂůϭϬϴϬĨƚϯdŽƚĂůϱϯϯĨƚϯdŽƚĂůϮϯϰďďůdŽƚĂůϭϵϯďďůdŽƚĂůϵϱďďůϰϮϳďďů^ƵƌĨĂĐĞĂƐŝŶŐWĞƌŵĂĨƌŽƐƚƚŽƐƵƌĨĂĐĞ^ƵƌĨĂĐĞĂƐŝŶŐdƚŽWĞƌŵĂĨƌŽƐƚ^ƵƌĨĂĐĞĂƐŝŶŐdŽƚĂů
ĂƐŝŶŐĞŵĞŶƚŝŶŐWƌŽŐƌĂŵ
^ƚƌŝŶŐ͗ ϵϱͬϴΗ^ƵƌĨĂĐĞĂƐŝŶŐ
tĞůůEĂŵĞ͗ dŚĞƚĂtĞƐƚ
ŽŵƉĂŶLJ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ>>
&ŝĞůĚ͗
ŽŶƚĂĐƚ͗ DŝĐŚĂĞůƵŶĐĂŶ
^ƚĂƚĞ͗ <
WƌŽƉŽƐĂůEƵŵďĞƌ͗ Ϯ
ĂƚĞ͗ ϭϮͬϭͬϮϬϮϭ
DĂĚĞLJ͗ ^ƚĞƉŚĞŶ>ĂƵƉĞƌ
ŝƐĐůĂŝŵĞƌEŽƚŝĐĞ
^ĐŚůƵŵďĞƌŐĞƌƐƵďŵŝƚƐƚŚŝƐĚŽĐƵŵĞŶƚǁŝƚŚƚŚĞďĞŶĞĨŝƚŽĨŝƚƐũƵĚŐŵĞŶƚ͕ĞdžƉĞƌŝĞŶĐĞ͕ĂŶĚŐŽŽĚŽŝůĨŝĞůĚƉƌĂĐƚŝĐĞƐ͘
dŚŝƐŝŶĨŽƌŵĂƚŝŽŶŝƐƉƌŽǀŝĚĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚŐĞŶĞƌĂůůLJĂĐĐĞƉƚĞĚŝŶĚƵƐƚƌLJƉƌĂĐƚŝĐĞ͕ƌĞůLJŝŶŐŽŶĨĂĐƚƐŽƌŝŶĨŽƌŵĂƚŝŽŶƉƌŽǀŝĚĞĚďLJŽƚŚĞƌƐ͕ůŝŵŝƚĂƚŝŽŶƐ͕ĐŽŵƉƵƚĞƌ
ŵŽĚĞůƐ͕ŵĞĂƐƵƌĞŵĞŶƚƐ͕ĂƐƐƵŵƉƚŝŽŶƐĂŶĚŝŶĨĞƌĞŶĐĞƐƚŚĂƚĂƌĞŶŽƚŝŶĨĂůůŝďůĞ͘
ĂůĐƵůĂƚŝŽŶƐĂƌĞĞƐƚŝŵĂƚĞƐďĂƐĞĚŽŶƉƌŽǀŝĚĞĚŝŶĨŽƌŵĂƚŝŽŶ͘ůůƉƌŽƉŽƐĂůƐ͕ƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐ͕ŽƌƉƌĞĚŝĐƚŝŽŶƐĂƌĞŽƉŝŶŝŽŶƐŽŶůLJ͘
EKtZZEdz/^'/sEKEZE/E'hZzKZKDW>dE^^K&d͕/E&KZDd/KEWZ^Ed͕&&d/sE^^K&DdZ/>͕WZKhd^KZ
^hWW>/^͕ZKDDEd/KE^D͕KZZ^h>d^K&d,^Zs/^ZEZ͘
ϮŽĨϮϬ
ŽĐƵŵĞŶƚŽŶƚƌŽů
Document Name and Version :
Once approved by Schlumberger and the Operator, any deviation from this program requires document agreement (SLB
QHSE Standard S010 Management of Change and Exemption Standard)
Approvals
Name Signature Date
Author Stephen Lauper
Schlumberger review
Schlumberger Approval
Customer Approval Michael Duncan
“By signing this document (or confirmation email), I confirm I have reviewed and approved it as the basis for the well cementing
program.”
Distribution List :
Cementing Program Generated From
Cementics File Theta West_ 9 5_8in surface_ v1.jdcx
Cementics Version 2020.2.4
Revision History
Date Version Description Author
12/1/2021 V2 Updated Depth slauper
ϯŽĨϮϬ
tĞůůĂƚĂ^ƵŵŵĂƌLJ
The cementing program incorporates the following data :
RigType Land
Fluids Return to Rig Floor
BHST 80.3 degF
All depths take the rig floor as reference
Mud Line Depth 0.0 ft
Mud Return Depth 0.0 ft
Section MD 3500.0 ft
Section TVD 3500.0 ft
Tubulars and Casing Hardware
MD
ft
OD
in
Joint
ft
Weight
lb/ft
ID
in
Grade Collapse
psi
Burst
psi
Thread
Prev Casing 100.0 20 40.0 94.0 19.124 K-55 520 2110
Casing 3500.0 9 5/8 40.0 40.0 8.835 L-80 3090 5750
Landing Collar 3420.0 Serial number :
Float Shoe
ϰŽĨϮϬ
Open Hole
Total Volume 713.2 bbl
Minimum Diameter 12.250 in
Maximum Diameter 12.250 in
Mean Diameter 12.250 in
Mean Annular Excess 118.6 %
Mean Equivalent Diameter 14.695 in
Formation
Top
MD
ft
Bottom
MD
ft
Bottom
TVD
ft
Frac
Top ED
lb/gal
Frac
Bottom
ED
lb/gal
Pore
Top ED
lb/gal
Pore
Bottom
ED
lb/gal
Lithology
Res.
Fluid Name
0.0 70.0 70.0 12.50 12.50 8.40 8.40
70.0 1200.0 1200.0 12.50 12.50 8.40 8.43 Permafrost
1200.0 3500.0 3500.0 12.50 12.50 8.43 7.20 Shale
ϱŽĨϮϬ
Temperature
Name Top MD
ft
Bottom MD
ft
Bottom TVD
ft
Temperature
degF
Gradient
degF/100ft
Relative
Gradient
degF/100ft
Sea Current
ft/min
Surface 0.0 0.0 0.0 20.0 0.00 -196702.76
Rock 0.0 1200.0 1200.0 32.0 1.00 1.00 0.00
Rock 1200.0 2500.0 2500.0 59.3 1.57 2.10 0.00
Rock 2500.0 3000.0 3000.0 69.8 1.66 2.10 0.00
BHST 3000.0 3500.0 3500.0 80.3 1.72 2.10 0.00
ϲŽĨϮϬ
&ůƵŝĚƐ^ƵŵŵĂƌLJ
Fluids
Type Name Density
lb/gal
Conditions K
lbf.s^n/ft2
nTy
lbf/100ft2
Drilling Fluid Surface Mud 9.50 Surface 68.0 degF 2.80E-3 0.72 21.63
Spacer MUDPUSH II
Spacer
10.00 Custom 65.0 degF [ T2 ] 2.93E-2 0.40 10.56
Slurry ARCTICSET Light
III Surface Lead
10.70 Downhole 68.0 degF 1.14E-1 0.28 0.00
Slurry ARCTICSET I
Surface Tail
15.70 Downhole 68.0 degF 2.13E-3 0.95 6.67
Wash Fresh Water 8.32 Manual 1.04E-4 1.00 1.00
* Compressible Rheology Parameters and Densities are displayed at P=1 atm and T=20 degC (65degF)
ϳŽĨϮϬ
DƵĚŝƌĐƵůĂƚŝŽŶ
Fluid Surface Mud
Number of Circulation 1.61
Total Volume at Ambient T 1125.0 bbl
Ambient Temperature 70.0 degF
Correction Slope 0.80
Pumping Stages
Fluid Pump Rate
bbl/min
Duration
hr:mn
Volume
bbl
Surface Mud 2.0 00:15 30.0
Surface Mud 4.0 00:15 60.0
Surface Mud 5.0 00:15 75.0
8.0 02:00 960.0
Well Security
Status Description Min Differential
Pressure
psi
At Depth
ft
At Time
hr:mn
Success Fracturing 15 100.0 02:45
Success Production/Influx 7 100.0 02:45
Success Burst 5634 0.0 02:45
Success Collapse 2948 3500.0 02:45
ϴŽĨϮϬ
&ůƵŝĚWůĂĐĞŵĞŶƚ
Surface Densities are computed at P=1 atm and T=Surface Temperature (20.0 degF)
Fluid Placement in Annulus
Fluid Name Top MD
ft
Bottom MD
ft
Length
ft
Volume
bbl
Surface Density
lb/gal
Surface Mud 0.0 0.0 0.0 0.0 9.50
MUDPUSH II Spacer 0.0 0.0 0.0 40.0 10.00
ARCTICSET Light III
Surface Lead
0.0 3000.0 3000.0 391.9 10.70
ARCTICSET I
Surface Tail
3000.0 3500.0 500.0 41.8 15.70
Fluid Placement in Pipe
Fluid Name Top MD
ft
Bottom MD
ft
Length
ft
Volume
bbl
Surface Density
lb/gal
Surface Mud 0.0 3354.1 3354.1 254.3 9.50
Fresh Water 3354.1 3420.0 65.9 5.0 8.32
ARCTICSET I
Surface Tail
3420.0 3500.0 80.0 6.1 15.70
ϵŽĨϮϬ
WƵŵƉŝŶŐ^ĐŚĞĚƵůĞ
Pumping Schedule
Fluid Name Duration
hr:mn
Volume
bbl
Pump
Rate
bbl/min
Injection
Temperature
degF
Comment
Cumulated
Time
hr:mn
MUDPUSH II Spacer 00:10 40.0 4.0 80.0 00:10
Pause 00:10 00:20
ARCTICSET Light III
Surface Lead
01:38 391.9 4.0 80.0 01:58
ARCTICSET I Surface
Tail
00:12 47.9 4.0 80.0 02:10
Pause 00:05 02:15
Fresh Water 00:01 5.0 4.0 80.0 02:16
Surface Mud : 00:49 254.3
> Surface Mud 00:39 234.3 6.0 80.0 02:55
> Surface Mud 00:10 20.0 2.0 80.0 03:05
Maximum Required Hydraulic Horsepower (HHP)60.2 hhp (at 02:55 hr:mn)
ϭϬŽĨϮϬ
ϭϭŽĨϮϬ
tĞůů^ĞĐƵƌŝƚLJ
Well Security
Status Description Min Differential
Pressure
psi
At Depth
ft
At Time
hr:mn
Success Fracturing 9 100.0 03:05
Success Production/Influx 6 100.0 03:05
Success Burst 5331 0.0 03:05
Success Collapse 2620 3500.0 03:05
N/A Dead-End Collapse 0 0.0 00:00
N/A Dynamic u-tubing in Dead-End 0 0.0 00:00
N/A Balanced u-tubing in Dead-End 0 0.0 00:00
ϭϮŽĨϮϬ
dĞŵƉĞƌĂƚƵƌĞKƵƚƉƵƚƐ
Temperature Summary Table
Static Temperature. at TOC 20.0 degF Static Temperature at BH 80.3 degF
Simulated HCT at TOC 64.1 degF Simulated HCT at BH 71.8 degF
Max First SK Temperature 80.0 de gF Max Last SK Temperature 80.0 degF
At time 00:00 hr:mn At time 00:00 hr:mn
ϭϯŽĨϮϬ
ĞŶƚƌĂůŝnjĂƚŝŽŶ
Centralizers
Alias Manufacturer
Commercial
Name Type Config Csg OD
in
Min OD
in
Max OD
in
Count
CT_2A09631225000C
0
CaseTech Std Bow Spring bow-
spring
9 5/8 10.500 13.431 18
Pattern Placement
Bottom MD
ft
Joints Centralizer Alias Pattern Min STO Depth
ft
2500.0 62.50 CT_2A09631225000C0 1/6 100.0 0.0
3500.0 25.00 CT_2A09631225000C0 1/3 100.0 2503.1
Computation time: 03:05
ϭϰŽĨϮϬ
t>>>EΎ///
Imposed StandOff
Bottom MD
ft
StandOff
%
3500.0 60.0
Average Fluid Concentrations
Average fluid concentration in annulus Average fluid concentration in pipe
ϭϱŽĨϮϬ
Final Fluid Concentrations
ϭϲŽĨϮϬ
Post-Processing Results (Annulus)
ϭϳŽĨϮϬ
KƉĞƌĂƚŽƌ^ƵŵŵĂƌLJ
Volume Summary
Fluid Name Pumped Volume
bbl
Prepared Fluid
Dead Volume
bbl
Prepared Fluid
bbl
Mix Fluid Dead
Volume
bbl
Silo dead
volume
ton
ARCTICSET Light III
Surface Lead
391.9 2.0 393.9 0.0 0
ARCTICSET I Surface
Tail
47.9 2.0 49.9 0.0 0
MUDPUSH II Spacer 40.0 2.0 42.0 0.0 0
Fresh Water 5.0 0.0 5.0 0.0 0
Material Summary
Additive Pumped
Quantity
Required
Quantity
Loadout
Quantity
Loadout
Items
Pack.
Name
Pack.
Size
Comment
D031 3607.44 lb 3787.81 lb 3787.81 lb 34.43 sack 110.00 lb
Fresh Water 13229.03
gal
13404.07
gal
13404.07
gal
0.00 0.00 gal
D182 186.10 lb 195.41 lb 195.41 lb 3.91 sack 50.00 lb
ARCTICSET Light III
Surface Lead Blend
79484.88
lb
79890.53
lb
79890.53
lb
0.00 bulk 0.00 lb
Mix Water 11455.76
gal
11552.64
gal
11552.64
gal
0.00 0.00 gal
D044 7793.17 lb 7832.94 lb 7832.94 lb 142.42 sack 55.00 lb
S002 596.14 lb 599.18 lb 599.18 lb 5.99 sack 100.00 lb
D047 85.21 gal 85.85 gal 85.85 gal 17.17 pail 5.00 gal
D065 278.20 lb 279.62 lb 388.94 lb 7.78 sack 50.00 lb
D079 715.36 lb 719.01 lb 719.01 lb 7.19 sack 100.00 lb
ARCTICSET I Surface
Tail Blend
22812.57
lb
23765.04
lb
23765.04
lb
0.00 bulk 0.00 lb
ϭϴŽĨϮϬ
Fluid Preparation
ARCTICSET Light III Surface Lead
Pumped Volume : 391.9 bbl
Density : 10.70 lb/gal
SVF : 33.9 %
Yield : 2.77 ft3/sk
Dry Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Dry Phase 88867.74 lb 89321.27 lb
ARCTICSET Light III
Surface Lead Blend:
100.00 lb per sack 79484.88 lb 79890.53 lb 79890.53 lb
Liquid Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Mix Fluid 13.194 gal/sk VBWOB 10487.02 gal 10540.54 gal
Mix Water 13.094 gal/sk VBWOB 10407.54 gal 10460.65 gal 10460.65 gal
Fresh Water 13.094 gal/sk VBWOB 10407.54 gal 10460.65 gal 10460.65 gal
D047 0.100 gal/sk VBWOB 79.48 gal 79.89 gal 79.89 gal
ARCTICSET I Surface Tail
Pumped Volume : 47.9 bbl
Density : 15.70 lb/gal
SVF : 47.6 %
Yield : 0.94 ft3/sk
Dry Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Dry Phase 22812.57 lb 23765.04 lb
ARCTICSET I Surface Tail
Blend:
79.74 lb per sack 22812.57 lb 23765.04 lb 23765.04 lb
Liquid Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Mix Fluid 3.684 gal/sk VBWOB 1053.94 gal 1097.95 gal
Mix Water 3.664 gal/sk VBWOB 1048.22 gal 1091.98 gal 1091.98 gal
Fresh Water 3.664 gal/sk VBWOB 1048.22 gal 1091.98 gal 1091.98 gal
D047 0.020 gal/sk VBWOB 5.72 gal 5.96 gal 5.96 gal
ϭϵŽĨϮϬ
MUDPUSH II Spacer
Pumped Volume : 40.0 bbl
Density : 10.00 lb/gal
Weighting Material Concentration Pumped Quantity Required Quantity Loadout Quantity
MUDPUSH II Spacer
Weighting Material:
2.15 lb/gal WBVOSpacer 3607.44 lb 3787.81 lb 3787.81 lb
- D031 2.15 lb/gal WBVOSpacer 3607.44 lb 3787.81 lb 3787.81 lb
Base Fluid Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Liquid Phase 0.9 bbl/bbl BVOSpace r 1580.17 gal 1659.18 gal
Fresh Water 0.9 bbl/bbl BVOSpacer 1563.28 gal 1641.44 gal 1641.44 gal
D182 5.00 lb/bbl WBVOBF 186.10 lb 195.41 lb 195.41 lb
Fresh Water
Pumped Volume : 5.0 bbl
Density : 8.32 lb/gal
Base Fluid Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Liquid Phase 1.0 bbl/bbl BVOWash 210.00 gal 210.00 gal
Fresh Water 1.0 bbl/bbl BVOWash 210.00 gal 210.00 gal 210.00 gal
ϮϬŽĨϮϬ
&ƌŝĐƚŝŽŶWƌĞƐƐƵƌĞĂůĐƵůĂƚŽƌ
Fluid rates and rheologies are calculated at P = 15 psi and T = 68.0 degF
Flow in Annulus at Various Rates
Pipe External Diameter : 9.625 in Hole Diameter : 12.250 in
Flow Rate – Minimum : 3.0 bbl/min Flow Rate – Maximum : 8.0 bbl/min
ĂƐŝŶŐĞŵĞŶƚŝŶŐWƌŽŐƌĂŵ
^ƚƌŝŶŐ͗ ϳΗWƌŽĚƵĐƚŝŽŶĂƐŝŶŐ
tĞůůEĂŵĞ͗ dŚĞƚĂtĞƐƚ
ŽŵƉĂŶLJ͗ 'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ>>
&ŝĞůĚ͗
ŽŶƚĂĐƚ͗ DŝĐŚĂĞůƵŶĐĂŶ
^ƚĂƚĞ͗ <
WƌŽƉŽƐĂůEƵŵďĞƌ͗ Ϯ
ĂƚĞ͗ ϭϮͬϭͬϮϬϮϭ
DĂĚĞLJ͗ ^ƚĞƉŚĞŶ>ĂƵƉĞƌ
ŝƐĐůĂŝŵĞƌEŽƚŝĐĞ
^ĐŚůƵŵďĞƌŐĞƌƐƵďŵŝƚƐƚŚŝƐĚŽĐƵŵĞŶƚǁŝƚŚƚŚĞďĞŶĞĨŝƚŽĨŝƚƐũƵĚŐŵĞŶƚ͕ĞdžƉĞƌŝĞŶĐĞ͕ĂŶĚŐŽŽĚŽŝůĨŝĞůĚƉƌĂĐƚŝĐĞƐ͘
dŚŝƐŝŶĨŽƌŵĂƚŝŽŶŝƐƉƌŽǀŝĚĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚŐĞŶĞƌĂůůLJĂĐĐĞƉƚĞĚŝŶĚƵƐƚƌLJƉƌĂĐƚŝĐĞ͕ƌĞůLJŝŶŐŽŶĨĂĐƚƐŽƌŝŶĨŽƌŵĂƚŝŽŶƉƌŽǀŝĚĞĚďLJŽƚŚĞƌƐ͕ůŝŵŝƚĂƚŝŽŶƐ͕ĐŽŵƉƵƚĞƌ
ŵŽĚĞůƐ͕ŵĞĂƐƵƌĞŵĞŶƚƐ͕ĂƐƐƵŵƉƚŝŽŶƐĂŶĚŝŶĨĞƌĞŶĐĞƐƚŚĂƚĂƌĞŶŽƚŝŶĨĂůůŝďůĞ͘
ĂůĐƵůĂƚŝŽŶƐĂƌĞĞƐƚŝŵĂƚĞƐďĂƐĞĚŽŶƉƌŽǀŝĚĞĚŝŶĨŽƌŵĂƚŝŽŶ͘ůůƉƌŽƉŽƐĂůƐ͕ƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐ͕ŽƌƉƌĞĚŝĐƚŝŽŶƐĂƌĞŽƉŝŶŝŽŶƐŽŶůLJ͘
EKtZZEdz/^'/sEKEZE/E'hZzKZKDW>dE^^K&d͕/E&KZDd/KEWZ^Ed͕&&d/sE^^K&DdZ/>͕WZKhd^KZ
^hWW>/^͕ZKDDEd/KE^D͕KZZ^h>d^K&d,^Zs/^ZEZ͘
ϮŽĨϭϴ
ŽĐƵŵĞŶƚŽŶƚƌŽů
Document Name and Version :
Once approved by Schlumberger and the Operator, any deviation from this program requires document agreement (SLB
QHSE Standard S010 Management of Change and Exemption Standard)
Approvals
Name Signature Date
Author Stephen Lauper
Schlumberger review
Schlumberger Approval
Customer Approval Michael Duncan
“By signing this document (or confirmation email), I confirm I have reviewed and approved it as the basis for the well cementing
program.”
Distribution List :
Cementing Program Generated From
Cementics File Theta West_ 7-in Prod_ v1.jdcx
Cementics Version 2020.2.4
Revision History
Date Version Description Author
12/01/2021 V2 Updated depths slauper
ϯŽĨϭϴ
tĞůůĂƚĂ^ƵŵŵĂƌLJ
The cementing program incorporates the following data :
RigType Land
Fluids Return to Rig Floor
BHST 173.9 degF
All depths take the rig floor as reference
Mud Line Depth 0.0 ft
Mud Return Depth 0.0 ft
Section MD 9500.0 ft
Section TVD 9499.1 ft
Tubulars and Casing Hardware
MD
ft
OD
in
Joint
ft
Weight
lb/ft
ID
in
Grade Collapse
psi
Burst
psi
Thread
Prev Casing 100.0 20 40.0 94.0 19.124 K-55 520 2110
3500.0 9 5/8 40.0 40.0 8.835 L-80 3090 5750
Casing 9500.0 7 40.0 29.0 6.184 P-110 5410 7740
Landing Collar 9420.0 Serial number :
Float Shoe
ϰŽĨϭϴ
Open Hole
Total Volume 475.3 bbl
Minimum Diameter 8.500 in
Maximum Diameter 12.250 in
Mean Diameter 8.500 in
Mean Annular Excess 40.0 %
Mean Equivalent Diameter 9.031 in
Formation
Top
MD
ft
Bottom
MD
ft
Bottom
TVD
ft
Frac
Top ED
lb/gal
Frac
Bottom
ED
lb/gal
Pore
Top ED
lb/gal
Pore
Bottom
ED
lb/gal
Lithology
Res.
Fluid Name
0.0 70.0 70.0 8.50 8.50 8.40 8.40
70.0 1200.0 1200.0 8.50 11.25 8.40 8.43 Permafrost
1200.0 3000.0 3000.0 11.25 12.50 8.43 8.40 Shale
3000.0 4000.0 4000.0 12.50 12.50 8.40 8.75 Shale
4000.0 7500.0 7499.4 12.50 12.50 8.75 8.80 Sandstone
7500.0 9750.0 9749.1 12.50 12.50 8.80 9.00 Sandstone
ϱŽĨϭϴ
Temperature
Name Top MD
ft
Bottom MD
ft
Bottom TVD
ft
Temperature
degF
Gradient
degF/100ft
Relative
Gradient
degF/100ft
Sea Current
ft/min
Surface 0.0 0.0 0.0 20.0 0.00 -196702.76
Rock 0.0 1200.0 1200.0 39.4 1.62 1.62 0.00
Rock 1200.0 2500.0 2500.0 60.5 1.62 1.62 0.00
Rock 2500.0 3500.0 3500.0 76.7 1.62 1.62 -196702.76
Rock 3500.0 4000.0 4000.0 84.8 1.62 1.62 0.00
Rock 4000.0 9400.0 9399.2 172.3 1.62 1.62 0.00
BHST 9400.0 9500.0 9499.1 173.9 1.62 1.62 0.00
ϲŽĨϭϴ
&ůƵŝĚƐ^ƵŵŵĂƌLJ
Fluids
Type Name Density
lb/gal
Conditions K
lbf.s^n/ft2
nTy
lbf/100ft2
Drilling Fluid WBM 9.20 Custom 68.0 degF 2.80E-3 0.72 21.63
Spacer MUDPUSH II
Spacer
11.00 Custom 65.0 degF [ T2 ] 2.93E-2 0.40 10.56
Wash Fresh Water 8.32 Manual 1.04E-4 1.00 1.00
Slurry 15.8ppg Tail Slurry 15.80 Custom 132.0 degF 1.77E-2 0.72 0.00
Slurry 13.0ppg Lead Slurry 13.00 Custom 132.0 degF 2.87E-3 0.82 1.09
* Compressible Rheology Parameters and Densities are displayed at P=1 atm and T=20 degC (65degF)
ϳŽĨϭϴ
DƵĚŝƌĐƵůĂƚŝŽŶ
Fluid WBM
Number of Circulation 1.75
Total Volume at Ambient T 1125.0 bbl
Ambient Temperature 60.0 degF
Correction Slope 0.80
Pumping Stages
Fluid Pump Rate
bbl/min
Duration
hr:mn
Volume
bbl
WBM 2.0 00:15 30.0
WBM 4.0 00:15 60.0
WBM 5.0 00:15 75.0
8.0 02:00 960.0
Well Security
Status Description Min Differential
Pressure
psi
At Depth
ft
At Time
hr:mn
Success Fracturing 284 3500.0 02:45
Success Production/Influx 331 3500.0 02:45
Success Burst 6807 0.0 02:45
Success Collapse 4881 9500.0 02:45
ϴŽĨϭϴ
&ůƵŝĚWůĂĐĞŵĞŶƚ
Surface Densities are computed at P=1 atm and T=Surface Temperature (20.0 degF)
Fluid Placement in Annulus
Fluid Name Top MD
ft
Bottom MD
ft
Length
ft
Volume
bbl
Surface Density
lb/gal
WBM 0.0 5235.0 5235.0 153.7 9.20
MUDPUSH II Spacer 5235.0 6500.0 1265.0 40.0 11.00
15.8ppg Tail Slurry 6500.0 9500.0 3000.0 94.9 15.80
Fluid Placement in Pipe
Fluid Name Top MD
ft
Bottom MD
ft
Length
ft
Volume
bbl
Surface Density
lb/gal
WBM 0.0 9420.0 9420.0 349.9 9.20
15.8ppg Tail Slurry 9420.0 9500.0 80.0 3.0 15.80
ϵŽĨϭϴ
WƵŵƉŝŶŐ^ĐŚĞĚƵůĞ
Pumping Schedule
Fluid Name Duration
hr:mn
Volume
bbl
Pump
Rate
bbl/min
Injection
Temperature
degF
Comment
Cumulated
Time
hr:mn
MUDPUSH II Spacer 00:08 40.0 5.0 68.0 00:08
Pause 00:10 00:18
15.8ppg Tail Slurry 00:20 97.8 5.0 68.0 00:38
Pause 00:10 00:48
WBM : 02:46 349.9
> WBM 00:25 200.0 8.0 68.0 01:13
> WBM 00:03 12.0 4.0 68.0 01:16
> WBM 02:18 137.9 1.0 68.0 03:34
Maximum Required Hydraulic Horsepower (HHP)115.8 hhp (at 00:18 hr:mn)
ϭϬŽĨϭϴ
ϭϭŽĨϭϴ
tĞůů^ĞĐƵƌŝƚLJ
Well Security
Status Description Min Differential
Pressure
psi
At Depth
ft
At Time
hr:mn
Success Fracturing 11 9500.0 03:34
Success Production/Influx 131 4000.0 03:34
Success Burst 6022 0.0 03:34
Success Collapse 3758 9500.0 03:34
N/A Dead-End Collapse 0 0.0 00:00
N/A Dynamic u-tubing in Dead-End 0 0.0 00:00
N/A Balanced u-tubing in Dead-End 0 0.0 00:00
ϭϮŽĨϭϴ
dĞŵƉĞƌĂƚƵƌĞKƵƚƉƵƚƐ
Temperature Summary Table
Static Temperature. at TOC 125.3 degF Static Temperature at BH 173.9 degF
Simulated HCT at TOC 119.0 degF Simulated HCT at BH 122.7 degF
Max First SK Temperature 125.7 degF Max Last SK Temperature 121.8 degF
At time 02:38 hr:mn At time 03:32 hr:mn
ϭϯŽĨϭϴ
ĞŶƚƌĂůŝnjĂƚŝŽŶ
Centralizers
Alias Manufacturer
Commercial
Name Type Config Csg OD
in
Min OD
in
Max OD
in
Count
CT_2A09631225000C
0
CaseTech Std Bow Spring bow-
spring
9 5/8 10.500 13.431 0
CT_2A07000850000C
0
CaseTech Std Bow Spring bow-
spring
7 7.875 9.280 18
Pattern Placement
Bottom MD
ft
Joints Centralizer Alias Pattern Min STO Depth
ft
6000.0 150.00 - 0 0.0 3500.0
9500.0 87.50 CT_2A07000850000C0 1/5 0.0 9500.0
Computation time: Cement Turns 01:41
ϭϰŽĨϭϴ
ϯWZdhZ
Average Fluid Concentrations
Average fluid concentration in annulus Average fluid concentration in pipe
ϭϱŽĨϭϴ
Final Fluid Concentrations
ϭϲŽĨϭϴ
Post-Processing Results (Annulus)
ϭϳŽĨϭϴ
KƉĞƌĂƚŽƌ^ƵŵŵĂƌLJ
Volume Summary
Fluid Name Pumped Volume
bbl
Prepared Fluid
Dead Volume
bbl
Prepared Fluid
bbl
Mix Fluid Dead
Volume
bbl
Silo dead
volume
ton
15.8ppg Tail Slurry 97.8 0.0 97.8 0.0 0
MUDPUSH II Spacer 40.0 2.0 42.0 0.0 0
Material Summary
Additive Pumped
Quantity
Required
Quantity
Loadout
Quantity
Loadout
Items
Pack.
Name
Pack.
Size
Comment
D031 5792.21 lb 6081.82 lb 6081.82 lb 55.29 sack 110.00 lb
Fresh Water 3884.61
gal
3959.78
gal
3959.78
gal
0.00 0.00 gal
D182 178.98 lb 187.93 lb 187.93 lb 3.76 sack 50.00 lb
15.8ppg Tail Slurry
Blend
44493.15
lb
44493.15
lb
44493.15
lb
0.00 bulk 0.00 lb
Mix Water 2381.15
gal
2381.15
gal
2381.15
gal
0.00 0.00 gal
D177 11.83 gal 11.83 gal 11.83 gal 0.22 drum 55.00 gal
D255 177.97 lb 177.97 lb 177.97 lb 8.09 sack 22.00 lb
D047 23.67 gal 23.67 gal 23.67 gal 4.73 pail 5.00 gal
D065 133.48 lb 133.48 lb 133.48 lb 2.67 sack 50.00 lb
ϭϴŽĨϭϴ
Fluid Preparation
15.8ppg Tail Slurry
Pumped Volume : 97.8 bbl
Density : 15.80 lb/gal
SVF : 40.5 %
Yield : 1.16 ft3/sk
Dry Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Dry Phase 44804.60 lb 44804.60 lb
15.8ppg Tail Slurry Blend: 94.00 lb per sack 44493.15 lb 44493.15 lb 44493.15 lb
- G 100.0 % BVOB 44493.15 lb 44493.15 lb 44493.15 lb
D255 0.4 % BWOC 177.97 lb 177.97 lb 177.97 lb
D065 0.3 % BWOC 133.48 lb 133.48 lb 133.48 lb
Liquid Phase Concentration Pumped Quantity Required Quantity Loadout Quantity
Mix Fluid 5.106 gal/sk VBWOB 2416.65 gal 2416.65 gal
Mix Water 5.031 gal/sk VBWOB 2381.15 gal 2381.15 gal 2381.15 gal
Fresh Water 5.031 gal/sk VBWOB 2381.15 gal 2381.15 gal 2381.15 gal
D177 0.025 gal/sk VBWOC 11.83 gal 11.83 gal 11.83 gal
D047 0.050 gal/sk VBWOC 23.67 gal 23.67 gal 23.67 gal
MUDPUSH II Spacer
Pumped Volume : 40.0 bbl
Density : 11.00 lb/gal
Weighting Material Concentration Pumped Quantity Required Quantity Loadout Quantity
MUDPUSH II Spacer
Weighting Material:
3.45 lb/gal WBVOSpacer 5792.21 lb 6081.82 lb 6081.82 lb
- D031 3.45 lb/gal WBVOSpacer 5792.21 lb 6081.82 lb 6081.82 lb
Base Fluid Concentration Pumped Quantity Required Quantity Loadout Quantity
Total Liquid Phase 0.9 bbl/bbl BVOSpace r 1519.71 gal 1595.69 gal
Fresh Water 0.9 bbl/bbl BVOSpacer 1503.46 gal 1578.63 gal 1578.63 gal
D182 5.00 lb/bbl WBVOBF 178.98 lb 187.93 lb 187.93 lb
6(&7,21
',9(57(56<67(0
3OHDVHVHH6HFWLRQ±5LJ(%RRN
6(&7,21
'5,//,1*)/8,'6
352*5$0
6(&7,21D
'5,//,1*)/8,'6
352*5$0
Version 1.2
^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
DRILLING FLUIDS PROGRAM
THETA WEST PANTHEON RESOURCES
Prepared By Customer Approver
Name Mark Fairbanks Approver Name Michael Duncan
Position Project Engineer Position Project Manager
Company M-I SWACO Alaska Company Great Bear
ob Number RALA AFE Number
ob Number WALA Approver ID
MI Version 1.2
MI Version Date Description
1. Draft Mud Program for comment and review
1.2 Final mud program
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 2 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Executive Summary
The Theta West Wellbore project is a hori ontal exploration well to be drilled approximately 25 miles south of Deadhorse and 8 m iles north west
of the Dalton highway The Theta West is planned at a location approximately 11.5 miles WNW of Talitha. The well is scheduled to spud in early
anuary of 2022 depending on weather. This will be drilled to a depth of 9 400 TD depending upon formation evaluations found while drilling
testing. The 12 1/4 surface hole will be drilled with a gel WBM to a depth of 3 000 MD and cemented in place with 9 5/8 casing. An 8 1/2
production hole section will be drilled with KLA-SHIELD to 9 400 TD and cemented in place with 7 casing. A 2 7/8 production tubi ng will be
installed. After logging the pilot hole will be plugged back and abandoned. The well may be perforated and fracd at this point if conditions warrant
before cutting and pulling the 7 casing
Well Specific Fluids Concerns
Hole Cleaning Monitor torque drag and cuttings returns at shakers on all intervals.
Hole Stability Primary concern is break-out during logging and evaluating operations conducted in the pilot hole observe cuttings for splinter ed
or fractured cuttings indicative of wellbore break-out.
Well Control Monitor pit volumes and gas readings for indications of influx Confirm with client that the required amount of weight material is on
location.
Lost Circulation Follow interval specific best practices and LCM decision trees consult with Project Engineer and wellsite supervisor prior to
applying LCM treatments.
Monitor Hydraulics and ECDs Daily well site hydraulics modelling is mandatory and should be used to evaluate hole-cleaning efficiency and
circulating system health.
Logistics Fluids and dry products will be supplied by and returned to the Prudhoe Bay Liquid Mud Plant.
Exploration Well Information Security Do not distribute well information to any unapproved personnel.
Key Performance Indicators
HSE Target
TRIR ero
Vehicle Incidents ero
HSE observations 1/day/employee
Spill Rate ero
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 3 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Well Summary
CSG LIN
Tubular Size
Hole
Size
Depth
MD TD
Depth
TVD TD
Depth
Drilled
Mud
System
Primary Mud
Density
Planned
Days
9 5/8 CSG
12 1/4 3 000 3 000 3 000 SPUD MUD Unweighted
7 CSG 8.5 9 400 9 400 6 400
KLA-
SHIELD 9.0 - 9.5
Production
Tubing 2 7/8 TBD TBD TBD
KLA-
SHIELD 9.0 - 9.5
2% KCl/
NaCl brine 9.3
Planned Capacity and Volume
Interval
Name
Drill Pipe
Spec
Open
Hole
Volume
Total
Hole
Volume
OH
CAP
OHxDP
Capacity
CSG
Vol
CSG
String
CAP
OHxCSG
Capacity
Conductor 0 0 0 NA NA 0 0.2116 NA
Surface 4 OD / 3.34
ID 455 455 0.1518 0.1362 270 0.09 0.0618
Intermediate 4 OD / 3.34
ID 456 726 0.0702 0.0546 364 0.0383 0.0226
Pilot Hole 4 OD / 3.34
ID 73 437 0.0364 0.0209 NA NA NA
Unweighted
6)'
6HHSDJHRIWKLVSURJUDP
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 4 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Property and Specification Table
Interval Name Surface Production
Hole Si e in 12 1/4 8 1/2
Depth MD ft 0 3 000
Depth MD TD ft 3000 9400
Depth TVD TD ft 3000 9400
Depth Drilled ft 3000 9400
Hole Drilled bbls 437.5 450
Drilling Fluid Volume bbls 2 762 1650
Mud System Type Spud Mud KLA SHIELD
Primary Mud Density ppg
Unweighted
then 9.4 -9.5
1 000 9.0-9.5
Plastic Viscosity cP ALAP ALAP
Yield Point lbs 100ft 25 - 50 20-30
LSYP lbs 100ft NA 7-10
Gel Strengths 10sec 10min
NA 10-18 25
API Fluid Loss 0
NC Initial 8.0
prior to TD 10
HTHP Fluid Loss cc 0min
NA NA
HTHP Disc Si e micron NA NA
HTHP Temp NA NA
pH 0 8.5- 10 9.0 - 10.0
Chlorides mg 2 500 20k
Hardness mg 200 100
Low Grav Solids NA 7
MBT ppb 35 10
Drill Solids vol 9 7
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 5 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Interval Discussion
Surface
A standard high viscosity fresh water / gel spud mud will be used for the surface interval to TD. The drill string will be back reamed out of the hole
and 9 5/8 casing will be run to bottom and cemented in place via single stage cement job.
Interval Hazards and Mitigations
BHA and Bit Balling
x Add SCREENKLEEN (0.25-0.5%) to minimi e clay to metal sticking if signs of bit balling are observed.
Permafrost, Gravel, and Sloughing Sand
x Maintain recommended rheology
x Maintain lowest flow line temperature possible by using only cold make-up water
Shallow Gas
x Minimi e circulation time and flow rate to reduce hydrate thawing
x Reduce flow rate until through the hydrate one
Hole Cleaning
x Maintain highest flow rate possible
x Rotate at highest possible rate while drilling and circulating
x The gel strengths should be elevated but flat ensuring a highly pumpable fluid with excellent hole cleaning capabilities
Swabbing, Tight Hole Conditions
x Clean and condition hole prior to tripping
x Adjust all drilling parameters to optimi e hole cleaning control ROP maintain highest possible flow rate and rotation
x Perform additional circulation prior to connections if needed to move cuttings out of the hole
Shallow Gas
x While not expected shallow gas may be encountered. Make sure mud weight is at least 9.4 ppg at 1 000 in case shallow gas is
seen. Use MI Wate if necessary. Maintain 9.4 ppg minimum until casing is on bottom cemented.
x
x Closely monitor pit volumes and surface gas detection equipment
Lost Circulation
x Use hole cleaning best practices taking extra precautions to prevent surge and swab
x Stage pumps slowly for smooth rate increases to achieve drilling rates
x Monitor pick-up and slack-off weights to detect cuttings loading
Drilling Fluid Properties
Fluid Specifications
Weight ppg Unweighted Spud Mud to 1 000 then 9.4-9.5 ppg to TD
PV cP ALAP
YP lb/100ft 25 50 Surface to TD
Funnel Viscosity sec/qt 150 250 reducing to 100 150 below permafrost at 1 200
pH 8.5-10
API Fluid Loss ml/30 min N.C. Initial 10 cc/30 min prior to TD
Chlorides mg/L 2 500
Hardness as Ca - mg/L 200
Sand Content 1.3%
Drill Solids - % Vol 9
Unweighted Spud Mud to 1 000 then 9.4-9.5 ppg to TD
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 6 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Solids Control Equipment
Approved and Recommended Products
Primary Fluid Formulations
Shakers
x Use proper LO/TO procedures prior to servicing the shakers.
x Inspect all shaker bed decking panels for wear replace as necessary for optimum screen performance. Follow
preventive maintenance schedule to include replacing the decking panels before it becomes a performance related
issue.
x Install 80-140 mesh screens or finer if losses over shaker are not a problem. Ensure screens are properly
tensioned per manufactures best recommendations. Spray down new screens with fresh water before operating
the shakers.
x Ensure all decking rubbers are in good condition
x Maintain proper deck angle to optimi e shaker performance. Shaker discharge should be slightly wet but not
whole mud.
x Minimi e flowline jetting during drilling to prevent fluid from overrunning shakers. If possible only jet the flowline
during connections or in short bursts while drilling.
x Check screens for holes between each connection.
x Follow Manufacturer recommended operating practices for optimum performance.
Centrifuge
x Ensure the centrifuge has been flushed to remove any residual mud from previous systems
x Run centrifuge below permafrost. Operate centrifuge at 2 500 RPM to allow for a higher throughput.
x Monitor effluent and cuttings discharge. Take -in and -out weights to evaluate centrifuge performance. Adjust feed
rate RPM and scroll based on manufacturers guidelines. Cuttings should have a wet appearance and be
discharged steadily. Dry or visible liquid in the cuttings are an indication that the centrifuge operating parameters
need to be adjusted.
Primary Products
Weight Material M-I WATE
Viscosifiers M-I GEL
Fluid Loss additive POLY PAC SUP UL
Alkalinity Control Caustic Soda Soda Ash Citric Acid
Bit BHA Balling SCREENKLEEN
Contingency Products
Thinner CF DESCO II SAPP
Cement Contamination Sodium Bicarbonate Citric Acid SAPP
Lost Circulation Material NUT PLUG FINE MEDIUM M-I- II FINE MEDIUM FORM-A-BLOK
Foaming/Aeration DEFOAM TRA / SCREENKLEEN
Product Quantity
Water - COLD lake water only 0.967 bbls
Soda Ash 0.125 ppb
M-I GEL 30 ppb
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 7 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Interval and System Specific Guidelines
Maintain lowest circulating temperature possible all new mud from Prudhoe Bay Mud Plant and rig water additions should be made with cold
lake water. Add 30-35 ppb M-I GEL into make-up water and allow to hydrate for 4-6 hours.
Dilution Rates Previous wells have required up to 100 bbl/hr to maintain system properties and circulating volume.
Fluid Loss Control Below the Permafrost After drilling below the base of the permafrost target API fluid loss equal to or less than 10 cc/30
min utili ing POLYPAC SUPREME UL 0.5 ppb has proven effective on past wells. Do not exceed 1.3 ppb without consulting Project Engineer.
Solids Control Run all solids control equipment (See above). Run 80 100 API screes initially screening up as soon as to
maintain a wet discharge for enhanced solids removal. Add drill water below shaker to avoid washing in unwanted solids.
Drilling through Hydrates If hydrates are seen on surface continue circulating (at lower rates) and begin additions of
SCREENKLEEN to help hydrates break out of the fluid. Water may need to be added to combat excessive viscosity seen by
hydrate entrainment.
Bit and BHA Balling Sticky clays at and below the permafrost can cause balling which can induce losses and slow ROP. Add SCREENKLEEN
for bit balling.
Soft Clays and Poor Cuttings Conveyance Add SCREENKLEEN if soft clays are causing poor cuttings conveyance on the shakers. If clays
begin sticking to shaker screens consider screening up as well.
Casing Run and Cementing Monitor fluid densities at the flow line and record changes. If fluid densities increase 0.2 ppg or more above system
density circulate and condition mud to bring densities back in spec. Once casing is on bottom begin lowering rheology with CF D esco II and drill
water to lower yield point to under 25 lb/100ft . Pre-treat bud used to bump plug with 0.5 ppb each of Sodium Bicarbonate and SAPP. Treat
cement returns with cement retarder Citric Acid CF Desco II and SAPP.
Waste Disposal All class II liquids cuttings and solid waste should be sent to WDF.
Hydraulics Modelling
Virtual Hydraulics Snapshot 12 1 4 Surface w .4 ppg Spud Mud
Drilling Fluid
Spud
Mud Weight .3 lbgal
Test Temp 0 F
PV ( 80 F) 20 cP
P 30 lb 100ft
LS P 18 lb 100ft
System Data
Flow Rate 550 galmin
Penetration Rate 200 fthr
Rotary Speed 100 rpm
Weight on Bit 10 1000 lbf
Bit Nozzles 14-14-14-14-13
13-13-13- 0 - 0
Pressure Losses
Modified Power Law
Drill String 516 psi
MWD 350 psi
Motor 375 psi
Bit 1 4 psi
Bit On Off 100 psi
Annulus 52 psi
Surface Equip 2 psi
U-Tube Effect 6 psi
Total System 1685 psi
ESD Cut ECD Cut
Csg Shoe .30 .74 .51 . 6
TD .32 .76 .65 10.0
VRDH - Version 3.3 Fann 35
File - Theta West 1.MDB, 72 Date 10 11 20
Pressure Distribution
Ann 7 Bit 25 DS 68
HCI
Bed Ht %
Hole CleaningIndex
VG G F P
0 100Bed Vol %
0140280
Va(ftmin)
Turb TurbLamTopBtm Top80 100
Annulus
Drill String
Temperature(F)
18 24 30 36
PV
YP
LSYP
PV (cP)P, LS P (lb100ft )
9.2 9.6 10.0 10.4
ESDECDESD CuttingsECD Cuttings
Density(lbgal)
16.000
15.000
165
165
12.250 3000
3000
GeometryMD TVD Csg OD ID(ft) (in)
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
3200
Depth
(ft)
12 1 4 surface TD
.4 ppg Mud
550 GPM - 200 RPM - 150 FPH
MD 3000 ft
TVD 3000 ft
Bit Size 12.25 in
Rot()Sliding( )100 0
Operator Pantheon
Well Name Theta West
Location North Slope, Alaska
Countr y U.S.A.
VIRTUAL HYDRAULICS*
SnapShot*1995-2018 M-I S WA C O Mark of M-I SWACO
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 8 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Virtual Hydraulics Parametric Analysis Hole Cleaning vs. Flow Rate
Production
The 8.5 intermediate interval will be drilled to 9 400 TD / 9 400 TVD utili ing KLA-SHIELD.
Interval Hazards and Mitigations
BHA and Bit Balling
x Previous Talitha wells experienced sever clay accretion at shakers and plugging of the flow line possum belly. This was remedie d by
drilling with the KLA_SHIELD system maintaining 10.7 ppb KCl (3%) and 3% KLA-STOP to mitigate clay hydration and accretion.
x Cuttings should be dry and uniform in shape/consistency. Mushy soft and amorphous cuttings indicate hydration. Test and record
KLA-STOP concentration on each mud check and when cuttings appear hydrated. Treat as needed with KLA-STOP to maintain 3%.
Hole Cleaning
x Maintain Highest flow rate possible.
x Rotate at highest possible rate while drilling and circulating.
x The gel strengths should be elevated but flat ensuring a highly pumpable fluid with excellent hole cleaning capabilities.
Swabbing Tight Hole Conditions
x Clean and condition hole prior to tripping.
x Adjust all drilling parameters to optimi e hole cleaning control ROP maintain highest possible flow rate and rotation.
x Perform additional circulation prior to connections if needed to move cuttings out of the hole.
Lost Circulation
x Use hole cleaning best practices taking extra precautions to prevent surge and swab.
x Stage pumps slowly for smooth rate increases to achieve drilling rates.
x Monitor pick-up and slack-off weights to detect cuttings loading.
Cement Contamination from Drill Out
x Reserve and dilute non-contaminated clean mud for interval operations.
x Monitor and adjust pH with Citric Acid and SAPP.
x Treat cement with Sodium Bicarbonate and SAPP.
x Discard mud with significant contamination or cross-linked polymers.
x Ensure consistent mud density for FIT test.
Hole Cleaning
Pantheon Theta West
Flow Rate (gal min)Hole Cleaning Index400 500 600 700 800 900
0
0.25
0.50
0.75
1.00
ROP 50 ft/hr
ROP 100 ft/hr
ROP 150 ft/hr
ROP 200 ft/hr 3RRU+ROH&OHDQLQJ
)DLU+ROH&OHDQLQJ
*RRG+ROH&OHDQLQJ
9HU\*RRG+ROH&OHDQLQJ
12 1 4 surface TD
.4 ppg Mud
550 GPM - 200 RPM - 150 FPH
MD 3000 ft
TVD 3000 ft
Bit Size 12.25 in
Date 10112021
Operator Pantheon
Well Name Theta West
Location North Slope, Alaska
Country U.S.A.
VIRTUAL HYDRAULICS*
VRDH*1995-2018 S WA C O Mark of M-I SWACO
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 9 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Drilling Fluid Properties
Fluid Specifications
Weight ppg 9.0 9.5
PV cP ALAP
YP lb/100ft 20 -30
LSYP lb/100ft 7 - 10
pH 9.0 - 10.0
API Fluid Loss ml/30 min 10
Chlorides 20k
Excess Sulfite ppm 50
Solids Control Equipment
Shakers
x 180-230 mesh (100-120 API)
x Run shakers in series flow
x Ensure all decking rubbers are in good condition
x Spray down shaker screens with base fluid prior to use
x Maintain proper deck angle to optimi e shaker performance. Shaker discharge should be slightly wet but not
whole mud.
x Avoid jetting the flowline while drilling this should be done only at connections or in short bursts while circulating.
x Check screens at every connection for holes or damage
Centrifuge
x Should only be run periodically while drilling in the production interval. Note that the centrifuge will strip out all
larger Calcium Carbonate and increase the fine particle concentration effecting the PSD
x Adjust feed rate as needed it is better to run less fluid than shut down and start up repeatedly.
Approved and Recommended Products
Primary Products
Weight Material MI WATE
Viscosifier DUO VIS
Fluid Loss Additive POLYPAC SUPREME UL
Shale Inhibitor KLA STOP
Brine Shale Inhibition KCl (Potassium Chloride)
Alkalinity Caustiv Soda Soda Ash Citric Acid
Lubricants LOTOR Lube 776
Contingency Products
Thinner CF Desco II SAPP
Screen Accretion SCREENKLEEN
Cement Contamination Sodium Bicarbonate SAPP Citric Acid
Foaming / Aeration Defoam Extra SKREENKLEEN
Lost Circulation Material WALNUT PLUG F/M M-I- II F/M
Primary Fluid Formulations
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 10 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Product Quantity
Water 0.93
DUO VIS 0.75-1.5 ppb
KCl (Potassium Chloride) 10.7 ppb
POLYPAC SUPREME UL 1.3 ppb
KLA STOP 3.0% vol
MI WATE 53.5 ppb (as needed to 9.5 ppg)
CONCOR 404 WH 1.3 ppb
BUSAN 1060 0.4 ppb
Soda Ash 0.2 ppb
System Specific Guidelines
Displacement Pump 30-50 bbls of new/viscosified KLA SHIELD (1-2 ppb additional DUO VIS) followed by the new KLA
SHIELD.
Bit Balling Screen Blinding Due to Sticky Clay Consult with Drilling Engineer and MI SWACO Project engineer prior to adding
SCREENKLEEN or DRIL ONE.
Hole Cleaning Sweeps should not be needed to properly clean the hole. Utili e Virtual Hydraulics software to analy e the ECD
impact of any high-vis or weighted sweep prior to pumping. Maintain drill string rotation and flow rates as high as allowable by
ECD and equipment limitations.
Wellbore Stability Monitor cuttings for quality and shape- cuttings should be dry and uniform in si e and shape. Soft hydrated
sticky clay cuttings indicate poor inhibition. Monitor KLA-STOP concentration on each mud check and as needed when cuttings
consistency changes. Maintain 3% concentration with KLA-STOP additions. Additionally splintered or long large cuttings may
indicate additional mud weight is needed. Drill Solids: Perform whole mud dilutions and product additions as needed to control
MBT values 10. Anticipate spikes in MBT values when ROP is high and when back-reaming.
Prevention of Bacterial Degradation: When mixing new fluid treat base water with Busan 1060 before mixing any other
products. Ensure the pH always remains above 9.0 adjust with Caustic Soda and Soda Ash as needed. If the pH is not responsive
to Soda Ash utili e Caustic Soda and consult with MI SWACO Project Engineer. Treat the system proactively with Busan 1060
and alkalinity modifiers prior to any trips or extended static wellbore conditions.
Lost Circulation Follow the attached LCM Decision Tree to treat seepage and moderate losses. Consult MI SWACO Project
Engineer client Drilling Engineer and SLB Tool Representatives prior to using coarse fibrous or other large PSD product for
catastrophic losses.
Ditch Magnets Ensure ditch magnets are utili ed and cleaned once per day or as frequently as needed by the SLB Tool
Representative.
Corrosion Mitigation Run a corrosion ring appropriately si ed for the BHA per the corrosion mitigation plan. Ensure pH values
are in-spec at all times.
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 11 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Hydraulics Modelling
Virtual Hydraulics Snapshot 8.5
Virtual Hydraulics Parametric Analysis Hole Cleaning vs. Pump Rate
Drilling Fluid
water based
Mud Weight .5 lb gal
Test Temp 120 F
PV ( 120 F) 18 cP
P24lb100ft
LS P 7 lb100ft
System Data
Flow Rate 550 galmin
Penetration Rate 100 fthr
Rotary Speed 120 rpm
Weight on Bit 10 1000 lbf
Bit Nozzles 15-15-15-14-14
0 - 0 - 0 - 0 - 0
Pressure Losses
Modified Power Law
Drill String 2766 psi
MWD 300 psi
Motor 250 psi
Bit 371 psi
Bit On Off 50 psi
Annulus 311 psi
Surface Equip 32 psi
U-Tube Effect 51 psi
Total System 4131 psi
ESD Cut ECD Cut
Csg Shoe .51 .63 . 7 10.0
TD .54 .66 10.18 10.30
VRDH - Version 3.3 Fann 35
File - Theta West 1.MDB,74 Date 10 11 20
Pressure Distribution
Ann Bit 11 DS 80
HCI
Bed Ht %
Hole CleaningIndex
VG G F P
0 100Bed Vol %
0 400 800
Va(ftmin)
Turb TurbLamTopBtm Top100 120 140
Annulus
Drill String
Temperature(F)
0102030
PV
YP
LSYP
PV (cP)P, LS P (lb100ft )
9.2 9.6 10.0 10.4
ESDECDESD CuttingsECD Cuttings
Density(lbgal)
9.625
8.835
3000
3000
8.500 9400
9400
GeometryMD TVD Csg OD ID(ft) (in)
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000
8500
9000
9500
10000
Depth
(ft)
8.5 Production
.5 ppg
550 GPM - 100RPM - 100 FPH
MD 400 ft
TVD 400 ft
Bit Size 8.5 in
Rot()Sliding( )100 0
Operator Pantheon
Well Name Theta West
Location North Slope, Alaska
Countr y U.S.A.
VIRTUAL HYDRAULICS*
SnapShot*1995-2018 M-I S WA C O Mark of M-I SWACO
Hole Cleaning
Pantheon Theta West
Flow Rate (gal min)Hole Cleaning Index400 420 440 460 480 500
0
0.25
0.50
0.75
1.00
ROP 100 ft/hr
ROP 150 ft/hr
ROP 200 ft/hr
ROP 250 ft/hr 3RRU+ROH&OHDQLQJ
)DLU+ROH&OHDQLQJ
*RRG+ROH&OHDQLQJ
9HU\*RRG+ROH&OHDQLQJ
8.5 Production
.5 ppg
550 GPM - 100RPM - 100 FPH
MD 400 ft
TVD 400 ft
Bit Size 8.5 in
Date 10112021
Operator Pantheon
Well Name Theta West
Location North Slope, Alaska
Country U.S.A.
VIRTUAL HYDRAULICS*
VRDH*1995-2018 S WA C O Mark of M-I SWACO
Pantheon Resources
Theta West 1 Fluids Technical Program
Version 1.4
Page 12 of 12 ^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞ
Completion
The Talitha production string will consist of 5.5 casing string which will be cemented in place in a single stage. Plan to bump the plug with 8.9-
9.0 ppg 2% KCL/NaCl brine system to perform off-rig VSP work prior to abandonment. Ensure system is treated with BUSAN 1060 and pH is in
specified parameter prior to RDMO. If corrosion inhibition is needed ie the well is not to be plug and abandoned then use corro sion inhibition
formula provide below. If the well will be plug and abandoned then use KCL Salt for the base brine leaving out the other products.
Completion Interval
Sodium Chloride Brine Specifications
Weight 60 F_ ppg 9.3 ppg
Chlorides _ mg/l As needed
pH 10.0
Primary Products
Weighting agent KCL 2% Sodium Chloride to weight
Corrosion Inhibitor CON OR 303A not needed
Biocide BUSAN 1060
Oxygen Scavenger Sodium Metabisulfite
Alkalinity Control Soda Ash Caustic Soda
Product .5 NaCl Corrosion Inhibited Brine
Water 0.905 bbl/bbl
Sodium Chloride (Salt) 74.1 PPB
CON OR 303A 1.3% v/v
Busan 1060 0.4 ppb
Sodium Metabisulfite 0.25 ppb
Soda Ash 0.25 ppb
Caustic Soda As needed for final pH of 10
perform off-rig VSP work prior to abandonment.
6(&7,21E
',$*5$02)08'6<67(0
3OHDVHVHH6HFWLRQ±5LJ(%RRN
6(&7,21F
*5$',(17&859(6
7+(7$:(67
ϭ
*UDGLHQW&XUYHV
)RU*UHDW%HDU3DQWKHRQ//&
7KHWD:HVW
,QWURGXFWLRQ
7KHIROORZLQJWZRSDJHVFRQWDLQWKHJUDGLHQWFXUYHVXWLOL]HGLQSODQQLQJWKLVZHOO
8WLOL]LQJGDWDIURPRIIVHWWLQJZHOOVH[SHFWHGSRUHSUHVVXUHIUDFWXUHDQGWHPSHUDWXUHJUDGLHQW
FXUYHVZHUHJHQHUDWHG&RPELQLQJWKHVHJUDGLHQWFXUYHVZLWKSODQVIRUDFKLHYLQJWKHREMHFWLYHV
RIWKHZHOOUHVXOWHGLQWKHSODQQHGPXGZHLJKWFXUYH
3RUH3UHVVXUH
,WZDVDVVXPHGWKDWWKHPXGZHLJKWVXVHGWRGULOOWKHRIIVHWWLQJZHOOVUHSUHVHQWDZHLJKWKLJKHU
WKDQWKHSRUHSUHVVXUHVHQFRXQWHUHGLQWKRVHZHOOV7KHSRUHSUHVVXUHFXUYHVKRZQKHUHUHSUHVHQWV
DFRQVHUYDWLYHSUHVVXUHDSSURDFKLQJWKHPXGZHLJKWVXVHG
0XG:HLJKW
7KHSODQQHGPXGZHLJKWVKRQRUWKHSRUHSUHVVXUHFXUYHE\UHPDLQLQJVLJQLILFDQWO\DERYHLWZKLOH
DFKLHYLQJWKHGHVLUHGGULOOLQJSDUDPHWHUVIRUWKLVZHOO
6WDUWZLWKDPXGZHLJKWQHDUWKDWWREHDFKLHYHGE\VXUIDFHFDVLQJVHWWLQJGHSWK
$FKLHYHDPXGZHLJKWRISSJE\WKHERWWRPRISHUPDIURVWDQGFRQWLQXLQJWRVXUIDFH
FDVLQJVHWWLQJGHSWK
0DLQWDLQORZPXGZHLJKWWKURXJKLQWHUPHGLDWHKROH¶7'
)UDFWXUH*UDGLHQW
7KHIRUPDWLRQIUDFWXUHJUDGLHQWFXUYHZDVGHULYHGXVLQJOHDNRIIWHVWV/27VDQGGLDJQRVWLF
IUDFWXUHLQMHFWLRQWHVWV'),7VLQWKHIROORZLQJRIIVHWZHOOV
:ROIEXWWRQ/27
6HTXRLD/27
+HPL6SULQJV6DJ5LYHU/27),7
+HPL6SULQJV8QLW/27
)UDQNOLQ%OXIIV),7
3LSHOLQH6WDWH),7
-DFREV/DGGHU),7
$OFRU'),7
$ONDLG'),7/27
7DOLWKD$'),7/27
Ϯ
7KHGDWDLVTXLWHVFDWWHUHGVRWKHFXUYHVKRZQKHUHUHSUHVHQWVWKHORZHUHQGRIWKHHTXLYDOHQWPXG
ZHLJKWVLQWKHGDWDVHW$OHDNRIIWHVWZLOOEHFRQGXFWHGXQGHUWKHVXUIDFHFDVLQJVKRHLQWKLVZHOO
WRFRQILUPIRUPDWLRQVWUHQJWK$QRWKHUZLOOEHFRQGXFWHGXQGHUWKHVKRHRIDQ\LQWHUPHGLDWH
FDVLQJWKDWLVVHWLQWKHZHOO
7HPSHUDWXUH*UDGLHQW&XUYH
7KHWHPSHUDWXUHJUDGLHQWFXUYHZDVGHULYHGXVLQJPD[LPXPUHFRUGLQJWKHUPRPHWHUGDWDRQ
ZLUHOLQHORJKHDGHUVIURPWKHIROORZLQJRIIVHWZHOOV
6HTXRLD
-DFREV/DGGHU
/DNH)HGHUDO
:.DGOHURVKLOLN8QLW
3LSHOLQH6WDWH
7KH GDWD ZDV VPRRWKHG DQG PDGH PRUH LQGLFDWLYH RI VWDELOL]HG IRUPDWLRQ WHPSHUDWXUHV E\
HOLPLQDWLQJDOOWHPSHUDWXUHVUHFRUGHGHDUOLHUWKDQHLJKWKRXUVVLQFHWKHODVWFLUFXODWLRQLQWKHZHOO
SULRUWRORJJLQJ
6(&7,21G
08':(,*+7&+$576
ϬϭϬϬϬϮϬϬϬϯϬϬϬϰϬϬϬϱϬϬϬϲϬϬϬϳϬϬϬϴϬϬϬϵϬϬϬϭϬϬϬϬϴ ϵ ϭϬ ϭϭ ϭϮ ϭϯ ϭϰ ϭϱ ϭϲĞƉƚŚ;ĨƚͿDƵĚtĞŝŐŚƚ;ƉƉŐͿ'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ͕dŚĞƚĂtĞƐƚŶƚŝĐŝƉĂƚĞĚWŽƌĞWƌĞƐƐƵƌĞĂŶĚ&ƌĂĐ'ƌĂĚŝĞŶƚŶƚŝĐŝƉĂƚĞĚWŽƌĞWƌĞƐƐƵƌĞŶƚŝĐŝƉĂƚĞĚ&ƌĂĐ'ƌĂĚŝĞŶƚ^ƉƵĚ DƵĚtĞŝŐŚƚŝŶĐƌĞĂƐŝŶŐƚŽďĂƐĞƉĞƌŵĂĨƌŽƐƚtĂƚĞƌĂƐĞĚDƵĚtĞŝŐŚƚŵĂŝŶƚĂŝŶĞĚĂďŽǀĞƉŽƌĞƉƌĞƐƐƵƌĞ
6(&7,21
$%1250$//<
*(235(6685('675$7$
6(&7,21D
*(2/2*,&352*126,6
)RUPDWLRQ 'HSWK
:HVW6DN6DQG
'NU'0)6
.5HJLRQDO7RS6HDO
8SSHU8SSHU)DQ
8SSHU)DQ
+XH
/RZHU)DQ
%DVH/RZHU)DQ
*5=
7RWDO'HSWK
7KHWD:HVW*HRORJLF3URJQRVLV
6(&7,21E
08':(,*+7&+$576
)5202))6(7:(//6
ϬϮϬϬϬϰϬϬϬϲϬϬϬϴϬϬϬϭϬϬϬϬϭϮϬϬϬϴ ϵ ϭϬ ϭϭ ϭϮ ϭϯ ϭϰ ϭϱ ϭϲĞƉƚŚ;ĨƚͿDƵĚtĞŝŐŚƚ;ƉƉŐͿ'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ͕dŚĞƚĂtĞƐƚWƌŽũĞĐƚĞĚWŽƌĞWƌĞƐƐƵƌĞĂŶĚ&ƌĂĐ'ƌĂĚŝĞŶƚƌĞůĂƚŝǀĞƚŽƉĂƐƚ'ƌĞĂƚĞĂƌtĞůůƐ;DƵĚǁĞŝŐŚƚǀĞƉƚŚͿŶƚŝĐŝƉĂƚĞĚWŽƌĞWƌĞƐƐƵƌĞŶƚŝĐŝƉĂƚĞĚ&ƌĂĐ'ƌĂĚŝĞŶƚůĐŽƌηϭDĞƌĂŬηϭdĂůŝƚŚĂůŬĂŝĚηϭůĐŽƌ,Z&/důĐŽƌ^ŚƵďůŝŬ&/důĐŽƌ,Z&ƌĂŐ'ƌĂĚŝĞŶƚůĐŽƌ^ŚƵďůŝĐ&ƌĂĐ'ƌĂĚŝĞŶƚ>KdůĐŽƌηϭ>KdDĞƌĂŬηϭ>KdůŬĂŝĚηϭ>Kd^ĞƋƵŽŝĂηϭ>KdDĂŐŐŝŽƌĞηϭ&/důŬĂŝĚηϭdĂůŝƚŚĂ>KddĂůŝƚŚĂ&/d
6(&7,21
6(,60,&5()5$&7,2125
5()/(&7,21
6(&7,21D
6+$//2:*$6+$=$5'
$1$/<6,6
1
3601 C Street Suite 1424
Anchorage, AK 99503
907-272-1232 (voice)
907-272-1344 (fax)
info@petroak.com
www.petroak.com
To: Michael Duncan
Great Bear Pantheon, Anchorage, Alaska
From: Petrotechnical Resources Alaska (PRA)
Date: November 3, 2021
Subject: Shallow Gas Hazards Assessment (SGHA) for proposed Theta West #1 (Alt B) well;
Surface Location: X=1709895, Y=5817385, ASP Zone 4, NAD83, US Survey Feet;
445' FSL, 2453' FWL, Sec. 32, T7N R11E, Umiat Meridian
This report summarizes the seismic analysis of potential shallow gas hazards for the proposed
Theta West (Alt B) well location estimated to spud in late 2021 or early 2022. In completing this
shallow gas hazards assessment, we reviewed several subset analytical seismic 3D volumes
created by eSeis, Inc. The Great Bear Pantheon 3D seismic data coverage extends over an area
of 800+sq. miles providing continuous seismic imaging for the wells depicted in Figure 1a. We
examined seismic interval velocity data extracted from the eSeis subset interval velocity volume
cross plotted with the Wolfbutton 25-6-9, Panthera 28-6-9, and Talitha-A sonic logs. We
analyzed offset well mud weight vs. depth data for indications of pressure. We examined the
eSeis interval velocity data for an estimation of the base of permafrost and for indications of
abnormal pressure. We inspected the eSeis Lithology, eSeis HC Lithology, and eSeis AVO
Types volumes to help determine the likelihood of shallow gas associated with any high
amplitude reflection events observed on the final 3D structural stack volume.
Various Great Bear Pantheon 3D seismic data volumes were examined for shallow amplitude
anomalies including the CGG 2015 Constant Offset Vector (COV) Pre-Stack Time Migrated
(PSTM) 3D seismic stack, the CGG 2016 PSTM 3D subset seismic stack, and the 2021 eSeis
PSTM subset stacks (Fig.1a). The eSeis Lithology, eSeis HC Lithology, and eSeis AVO Types
analytical volumes facilitated the calibrated AVO analysis of observed shallow, high amplitude
stack reflection events.
Log curve data and historic drilling data used in this report were taken from the Wolfbutton 25-
6-9, the Panthera 28-6-9, and the Talitha-A historical well files (Fig.1b). We examined the eSeis
seismic interval velocity volume and an interval velocity function extracted at the Theta West
(Alt-B) location shown on an outline of the eSeis interval velocity volume (Fig.2).
2
Except for the eSeis seismic interval velocity volume, the seismic processing datum is 900ft., so
zero time on non-velocity-related seismic displays is 900ft. above mean sea level. The eSeis
interval velocity seismic volume uses a datum of 1000ft., so zero time on the seismic interval
velocity profiles is 1000ft. above mean sea level. The approximate TVDSS depths labeled on
the seismic images were estimated using checkshot and seismic synthetic time-depth
information.
Permafrost, Gas Hydrates, Shallow Gas
The Base Permafrost was picked at the following depths for surrounding wells: 1280.5’TVD (-
946.5’TVDSS) in the Wolfbutton 25-6-9, 1440’TVD (-1050.5’TVDSS) in the Panthera 28-6-9,
and 1344’TVD (-1025’TVDSS) in the Talitha-A. The dashed blue horizon (Fig.3a) indicates the
Base Permafrost on an arbitrary seismic profile O-O’ tying the Wolfbutton 25-6-9 and the
Panthera 28-6-9 well locations to the Theta West (Alt B) well location. Similarly, the Base
Permafrost is shown by the dashed blue horizon on an arbitrary seismic profile T-T’ tying the
Theta West (Alt B) well location to the Talitha-A well location (Fig.3b).
Inspection of the NW-to-SE arbitrary seismic profile (22-22’) extracted from the eSeis seismic
interval velocity volume (Fig.4) depicts the shallow interval velocities at the Theta West (Alt B),
the Talitha-A, and the Pipeline State#1 well locations. Hotter colors indicate faster interval
velocities while cooler colors indicate slower interval velocities. The interval velocity scale runs
from 6000ft/sec to 13,000ft/sec. Due to low fold in the shallow section, the seismic interval
velocity estimate has an increasing uncertainty with decreasing depth. The greatest error occurs
in the upper 300-400ms where there is little to no seismic coverage. This lack of data causes the
linear boundary just above the 200ms time line resulting from applying a seismic processing
datum of 1000ft. above sea level and a subsurface velocity of 10,000ft/sec.
Well control at the Talitha-A and Pipeline State#1 locations establish Base Permafrost picks as
depicted at roughly -1,000’tvdss. No shallow sonic data was collected at the Talitha-A location
and uncertainty may exist with using the Pipeline State#1 sonic as evidenced by the three
separate Base Permafrost picks made by the same geologist (K. Bird image in Fig.5). We
observe an interval velocity interval within the permafrost section that appears slower at the
Pipeline State#1 location matching the behavior of the Pipeline State sonic curve (Fig.5).
Seismic interval velocity functions were extracted at the Theta West (Alt B) proposed well
location and at the Talitha-A well location (Fig.2). These interval velocities were converted to
Interval Transit Time (ITT) for comparison cross plotting with the Wolfbutton 25-6-9, Talitha-A,
and Panthera 28-6-9 sonic interval transit time data. The interval velocity function extracted at
the Theta West (Alt B) location is shown plotted on the Wolfbutton 25-6-9 and the Panthera 28-
6-9 sonic ITT curves (Fig.6). The Theta West (Alt B) interval velocity function is shown plotted
with the Talitha-A seismic interval velocity function, along with the Wolfbutton 25-6-9, Panthera
28-6-9, and Talitha-A sonic curves (Fig.7). Note the Talitha-A sonic log does not cover the
shallow section.
The seismic interval velocity at the Theta West (Alt B) location appears to track with the slower
zones of travel time in the Wolfbutton sonic within the permafrost interval. This uncertainty
3
likely results from low seismic fold and the low frequency of seismic data which may be
combining to mask detection of the interbedded, higher velocity permafrost layers. Below -
1000’tvdss the curves start to track similarly, demonstrating increasing velocity with depth. The
seismic interval velocity function extracted at the Talitha-A location exhibits a similar behavior
to the Theta West Alt-B interval velocity curve. The inflection point at -1000’tvdss appears to
record the slowest ITT (~140Psec/ft) below which the velocities tend to increase with depth. We
believe this observation supports encountering a Base Permafrost at the Theta West (Alt B)
location at -1000’TVDSS, on trend with the Base Permafrost picks recorded at the Wolfbutton
25-6-9 (-947’tvdss), Panthera 28-6-9 (-1051’tvdss), and Talitha-A (-1025’tvdss) well locations.
No reference to shallow gas anomalies or gas hydrates was noted in a review of the well history
reports for the Wolfbutton 25-6-9 well and for the Talitha-A well. An arbitrary seismic profile
from the eSeis AVO Types volumes ties the Wolfbutton 25-6-9 to the Theta West (Alt-B)
location (Fig.3c). This arbitrary seismic profile shows a mixture of non-gas-sand AVO behavior
at the Wolfbutton 25-6-9 well location somewhat similar to the Theta West (Alt-B) location.
More discontinuous seismic reflection character is evident at the Wolfbutton 25-6-9 well location
as compared to more continuous seismic reflection character at the Theta West (Alt-B) location
as seen on the arbitrary seismic profile extracted from the 2016 Great Bear 3D PSTM data
(Fig.3a).
The Wolfbutton 25-6-9 and Panthera 28-6-9 wells drilled the shallow section with no reported
anomalous indications of gas hydrates or abnormal geopressure. The Panthera 28-6-9 well plan
cited a mud weight program starting with 8.5ppg varying to a final mud weight of 9.0-9.4ppg.
The Talitha-A mud log indicates a similar mud weight program over the shallow section starting
with a mud weight of 8.8ppg at 100’MD increasing to 9.4-9.5ppg at the 3175’MD casing point.
At the proposed Theta West (Alt B) well location, the West-to-East seismic profile R-R’
extracted from the eSeis PSTM stack volume (Fig. 8) does not show high amplitude reflection
events. Examination of the eSeis HC Lithology volume confirms the absence of high amplitude
seismic reflection events.
The top seismic profile image (Fig.9) is line R-R’ from the eSeis PSTM stack subset volume and
the bottom seismic profile image is from the eSeis HC Lithology volume. The yellow colors
indicate possible sands. If the sands are high amplitude and exhibit an AVO type consistent with
gas, the color will be red as opposed to yellow. The lack of red colored events on the HC
Lithology profile and horizon extractions indicates the likelihood of wet sands as opposed to gas
sands.
Figure 10 shows the same West-to-East seismic profile R-R’ tying the proposed Theta West (Alt
B) well location. The top seismic profile image is from the eSeis PSTM stack subset volume and
the bottom seismic profile image is from the eSeis AVO Types volume.
Through the use of colors, the eSeis AVO Types volume shows the AVO classification for
reflection events visible on the PSTM stack structural volume. AVO classifications are depicted
by the following color scheme: PinkÆAVO ClassI (Type1), RedÆAVO ClassII (Type2),
p
a Base Permafrost at the Theta West (Alt B)
location at -1000’TVDSS,
()
f non-gas-sand AVO behavior (g ) y p g
at the Wolfbutton 25-6-9 well location somewhat similar to the Theta West (Alt-B) location.
At the proposed Theta West (Alt B) well locationa,p
PSTM stack volume (Fig. 8) does not show high amplitude reflection
()
events.
No reference to shallow gas anomalies or gas hydrates was noted in a review of the well history ggy
reports for the Wolfbutton 25-6-9 well and for the Talitha-A well. A
pyp
The lack of red colored events on the HCg, pp y
Lithology profile and horizon extractions indicates the likelihood of wet sands as opposed to gas
sands.
4
GreenÆAVO ClassIII (Type3), VioletÆAVO ClassIV (Type4), and Light BlueÆAVO ClassV
(Type5).
Pink/red, violet, and light blue colors are present at the Theta West (Alt-B) location indicating
interbedded sands, shales, and coals (AVO Types 1, 2, 4, and 5). The lack of a high impedance
response indicated by the absence of red colors on the HC Lithology volume (see Fig.9) indicates
the likelihood of encountering wet sands as opposed to gas sands.
Faults
Inline and cross line seismic profiles were inspected for the shallow section from 400ms-1500ms
(~ -700’to -6000’tvdss). No faults within the resolution of the seismic were observed in the
shallow section of the available 3D seismic data. No drilling losses attributed to shallow faulting
were noted in the drilling summary reports for the surrounding wells which include the
Wolfbutton 25-6-9, the Panthera 28-6-9, the Talitha-A, and the Pipeline State #1 wells.
Pressure
Sonic velocity data from the Wolfbutton 25-6-9 cross plotted with a seismic interval velocity
extracted at the Theta West (Alt B) location indicates that below the Base Permafrost the Theta
West (Alt B) well should penetrate a normally pressured section similar to that encountered by
the Wolfbutton well. Below the Base Permafrost, the Interval Transit Time (ITT) curve
calculated from the seismic interval velocity function extracted at the Theta West (Alt B)
location matches the Wolfbutton 25-6-9 velocity trend fairly well (Fig.6). As previously
mentioned, within the permafrost section, the Theta West (Alt-A) seismic ITT curve estimates a
slower velocity trend than the Wolfbutton 25-6-9 sonic.
The Wolfbutton 25-6-9 and Panthera 28-6-9 mud weight vs. depth reports indicate that these
wells were normally pressured in the shallow section. The Panthera 28-6-9 pre-drill mud weight
program started at 8.5ppg and ending with a mud weight range of 9.0-9.4ppg . The Wolfbutton
25-6-9 pre-drill mud weight program stated a mud weight range of 8.8-9.2ppg from 114’-2500’.
No anomalous velocity inversions are observed on the Theta West (Alt A) seismic interval
velocity (Fig.6) that might indicate abnormally pressured zones. Given the uncertainty within the
permafrost section, inspection of the northwest to southeast seismic interval velocity profile
(Fig.4) indicates a subsurface velocity profile similar to the Talitha-A and Pipeline State#1 wells
below the Base Permafrost.
The Theta West (Alt B) drilling program will integrate best drilling practices utilized in the
successful drilling of previous Great Bear Pantheon operated wells: Alcor#1, Merak#1,
Alkaid#1, and Talitha-A. The Theta West (Alt B) drilling plan acknowledges the possibility of
encountering shallow drilling hazards and incorporates processes to mitigate those risks while
drilling.
p,,
drilling plan acknowledges the possibility of ,() gp g p
encountering shallow drilling hazards and incorporates processes to mitigate those risks w
pgpg ggppg
No anomalous velocity inversions are observed on the Theta West (Alt A) seismic interval
velocity (
p p
No faults within the resolution of the seismic were observed
No drilling losses attributed to shallow faultingg
were noted in the drilling summary reports for the surrounding wells w
y
t below the Base Permafrost the Theta()
West (Alt B) well should penetrate a normally pressured section
were normally pressured in the shallow section.
(Fig.6) that might indicate abnormally pressured zones.
y
y (
() g
The lack of a high impedance, , ( yp ,,, ) g p
response indicated by the absence of red colors on the HC Lithology volume (see Fig.9) indicatespy
the likelihood of encountering wet sands as opposed to gas sands.
Wolfbutton 25-6-9 and Panthera 28-6-9 m
5
Submitted by:
0LFKDHO'+HOWRQ
&RQVXOWDQW*HRSK\VLFLVW
3HWURWHFKQLFDO5HVRXUFHVRI$ODVND
&6WUHHW6XLWH
$QFKRUDJH$.
(PDLOPKHOWRQ#SHWURDNFRP
&HOO
6
Figure 1a. Map view showing the areal coverage of the Great Bear Pantheon 3D seismic data used in
this report. Township and section outlines are shown for scale.
Figure 1b. Map showing the Panthera 28-6-9, the Wolfbutton 25-6-9, the Talitha-A, the Pipeline
State#1, and the proposed Great Bear Theta West (Alt B) well locations. Other well locations are shown
for reference. Township and section outlines are displayed for scale.
Redacted 5/22/2024 M. Guhl
10
Figure 6. Seismic velocity function extracted from the eSeis interval velocity volume at the proposed
Theta West (Alt B) location, converted to Interval Transit Time (ITT --Psec/ft), and plotted with the
Panthera 28-6-9 and Wolfbutton 25-6-9 sonic curves. Enlargement at right.
6(&7,21
6($%('$1$/<6,6
1$
6(&7,21
%21'68%0,77('
%
6(&7,21
'5,//,1*352*5$0
6(&7,21D
7+(7$:(67'5,//,1*
352*5$0
ƌŝůůŝŶŐWƌŽŐƌĂŵ
dŚĞƚĂtĞƐƚ
ϭ ^ĞƚĐĞůůĂƌ
Ϯ ƌŝůůĂŶĚƐĞƚĐŽŶĚƵĐƚŽƌ
ϯ D/Zh
ϰ EhĂŶĚĨƵŶĐƚŝŽŶƚĞƐƚĚŝǀĞƌƚĞƌ
ϱ WhϭϮ͘ϱΗŚLJďƌŝĚďŝƚĂŶĚĐŽůůĂƌƐ
ϲ ^ƉƵĚǁĞůůǁŝƚŚ,ĂŶĚϰΗĚƌŝůůƐƚƌŝŶŐ
ϳ ƌŝůůƚŽϱϬϬΖ
ϴ dKK,ĂŶĚWhƐŵĂƌƚ,ǁŝƚŚƚƌŝƉůĞĐŽŵďŽĂŶĚŚLJďƌŝĚďŝƚ
ϵ ƌŝůůǁŝƚŚ^ƉƵĚDƵĚƚŽϯϱϬϬΖ
ϭϬ ΘŚŽůĞ
ϭϭ dKK,͕>,
ϭϮ d/,ǁͬƐŚŽĞƚƌĂĐŬĂŶĚϵϱͬϴΗ͕ϰϬůďͬĨƚ͕>ͲϴϬdĐĂƐŝŶŐ
ϭϯ ^ĞƚƐƚĂŐĞƚŽŽůŝŶĐĂƐŝŶŐϱϬϬΖĨƌŽŵƐƵƌĨĂĐĞ
ϭϰ ĞŵĞŶƚƐƵƌĨĂĐĞĐĂƐŝŶŐƉĞƌĐĞŵĞŶƚĚĞƐŝŐŶ
ϭϱ EŝǀĞƌƚĞƌ͕EhǁĞůůŚĞĂĚĂŶĚKWΖƐ
ϭϲ &ƵŶĐƚŝŽŶĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚKWΖƐ
ϭϳ WƌĞƐƐƵƌĞƚĞƐƚƐƵƌĨĂĐĞĐĂƐŝŶŐƚŽϯϱϬϬƉƐŝ
ϭϴ d/,ǁͬŝƚ͕>t͕ŽůůĂƌƐ͕ĞƚĐ
ϭϵ ^ƚŽƉĞǀĞƌLJϱϬϬΖĂŶĚƉƵŵƉĂƐƵƌǀĞLJ
ϮϬ dĂŐƐŚŽĞƚƌĂĐŬ
Ϯϭ ƌŝůůƐŚŽĞƚƌĂĐŬнϮϬΖŽĨŶĞǁŚŽůĞ
ϮϮ ^ǁĂƉŵƵĚƚŽtD
Ϯϯ ůŽƐĞƉŝƉĞƌĂŵƐĂŶĚƉĞƌĨŽƌŵ>Kd
Ϯϰ ZĞĐŽƌĚ>KdĂŶĚĂƚƚĂŝŶƌŝůůŝŶŐŶŐŝŶĞĞƌĂƉƉƌŽǀĂůƉƌŝŽƌƚŽƉƌŽĐĞĚŝŶŐ
Ϯϱ ƌŝůůŝŶƚĞƌŵĞĚŝĂƚĞŚŽůĞƚŽĂƉƉƌŽdžŝŵĂƚĞůLJϲϴϬϬΖ
Ϯϲ ƚĞŶŐŝŶĞĞƌŝŶŐĚŝƌĞĐƚŝŽŶ͕dKK,ǁŝƚŚ,ƚŽƉŝĐŬƵƉĂĐŽƌŝŶŐĂƐƐĞŵďůLJ
Ϯϳ d/,ǁŝƚŚĐŽƌŝŶŐĂƐƐĞŵďůLJĂŶĚĐƵƚĐŽƌĞ͕dKK,
Ϯϴ d/,ǁŝƚŚďŝƚĂŶĚ,͕ƌĞƐƵŵĞĚƌŝůůŝŶŐ
Ϯϵ ƌŝůůŝŶƚĞƌŵĞĚŝĂƚĞŚŽůĞƚŽdĂƐĚŝƌĞĐƚĞĚďLJƌŝůůŝŶŐŶŐŝŶĞĞƌ;ĞƐƚŝŵĂƚĞĚϵ͕ϱϬϬΖͿ
ϯϬ ΘǁĞůů
ϯϭ dKK,
ϯϮ Zh,ǁŝƚŚůŽŐŐŝŶŐƚŽŽůƐ
ϯϯ ZƵŶĨƵůůůŽŐŐŝŶŐƐƵŝƚĞ
ϯϰ d/,ǁΖďŝƚƚŽĐůĞĂŶŚŽůĞ
ϯϱ ΘǁĞůů
ϯϲ dKK,
ϯϳ ŚĂŶŐĞƉŝƉĞƌĂŵƐƚŽϳΗƌĂŵƐ͘&ƵŶĐƚŝŽŶƚĞƐƚĂŶĚƉƌĞƐƐƵƌĞƚĞƚƌĂŵƐĂŶĚĂŶŶƵůĂƌƉƌĞǀĞŶƚĞƌ
ϯϴ d/,ǁŝƚŚĂƐŝŶŐƚŽd͘WůĂĐĞƐƚĂŐĞƚŽŽůĂƐĚŝƌĞĐƚĞĚďLJŶŐŝŶĞĞƌŝŶŐ͕ƐƚŝŵĂƚĞĚϴ͕ϬϬϬΖds
ϯϵ >ĂŶĚĐĂƐŝŶŐŽŶŚĂŶŐĞƌ
ϰϬ Z/>^
ϰϭ WƌĞƐƐƵƌĞƚĞƐƚŚĂŶŐĞƌ
ϰϮ WƵŵƉĐĞŵĞŶƚƉĞƌĚĞƐŝŐŶ͕ƉůĂĐŝŶŐdKĂƚϲ͕ϱϬϬΖ
ϰϯ tK͕dĞƐƚKWΖƐ
ϰϰ ƵůůŚĞĂĚĚĞŝƐĞůƚŽĨƌĞĞnjĞƉƌŽƚĞĐƚĂŶŶƵůƵƐ
ϰϱ ƌƵŶ>ǁŝƚŚƚĞŵƉĞƌĂƚƵƌĞůŽŐĂƐĞ^ƵƌĨĂĐĞŚŽůĞĂŶĚĐĂƐŝŶŐEhKWΖƐƌŝůů/ŶƚĞƌŵĞĚŝĂƚĞ>ŽŐ5HYLVHG
97/
ƌŝůůŝŶŐWƌŽŐƌĂŵ
dŚĞƚĂtĞƐƚ
ϭ ^ĞƚĐĞůůĂƌ
Ϯ ƌŝůůĂŶĚƐĞƚĐŽŶĚƵĐƚŽƌ
ϯD/Zh
ϰ EhĂŶĚĨƵŶĐƚŝŽŶƚĞƐƚĚŝǀĞƌƚĞƌ
ϱ WhϭϮ͘ϱΗŚLJďƌŝĚďŝƚĂŶĚĐŽůůĂƌƐ
ϲ ^ƉƵĚǁĞůůǁŝƚŚ,ĂŶĚϰ ΗĚƌŝůůƐƚƌŝŶŐ
ϳ ƌŝůůƚŽϱϬϬΖ
ϴ dKK,ĂŶĚWhƐŵĂƌƚ,ǁŝƚŚƚƌŝƉůĞĐŽŵďŽĂŶĚŚLJďƌŝĚďŝƚ
ϵ ƌŝůůǁŝƚŚ^ƉƵĚDƵĚƚŽϯϱϬϬΖ
ϭϬ ΘŚŽůĞ
ϭϭ dKK,͕>,
ϭϮ d/,ǁͬƐŚŽĞƚƌĂĐŬĂŶĚϵϱͬϴΗ͕ϰϬůďͬĨƚ͕>ͲϴϬdĐĂƐŝŶŐ
ϭϯ ^ĞƚƐƚĂŐĞƚŽŽůŝŶĐĂƐŝŶŐϱϬϬΖĨƌŽŵƐƵƌĨĂĐĞ
ϭϰ ĞŵĞŶƚƐƵƌĨĂĐĞĐĂƐŝŶŐƉĞƌĐĞŵĞŶƚĚĞƐŝŐŶ
ϭϱ EŝǀĞƌƚĞƌ͕EhǁĞůůŚĞĂĚĂŶĚKWΖƐ
ϭϲ &ƵŶĐƚŝŽŶĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚKWΖƐ
ϭϳ WƌĞƐƐƵƌĞƚĞƐƚƐƵƌĨĂĐĞĐĂƐŝŶŐƚŽϯϱϬϬƉƐŝ
ϭϴ d/,ǁͬŝƚ͕>t͕ŽůůĂƌƐ͕ĞƚĐ
ϭϵ ^ƚŽƉĞǀĞƌLJϱϬϬΖĂŶĚƉƵŵƉĂƐƵƌǀĞLJ
ϮϬ dĂŐƐŚŽĞƚƌĂĐŬ
Ϯϭ ƌŝůůƐŚŽĞƚƌĂĐŬнϮϬΖŽĨŶĞǁŚŽůĞ
ϮϮ ^ǁĂƉŵƵĚƚŽtD
Ϯϯ ůŽƐĞƉŝƉĞƌĂŵƐĂŶĚƉĞƌĨŽƌŵ>Kd
Ϯϰ ZĞĐŽƌĚ>KdĂŶĚĂƚƚĂŝŶƌŝůůŝŶŐŶŐŝŶĞĞƌĂƉƉƌŽǀĂůƉƌŝŽƌƚŽƉƌŽĐĞĚŝŶŐ
Ϯϱ ƌŝůůŝŶƚĞƌŵĞĚŝĂƚĞŚŽůĞƚŽĂƉƉƌŽdžŝŵĂƚĞůLJϲϴϬϬΖ
Ϯϲ ƚĞŶŐŝŶĞĞƌŝŶŐĚŝƌĞĐƚŝŽŶ͕dKK,ǁŝƚŚ,ƚŽƉŝĐŬƵƉĂĐŽƌŝŶŐĂƐƐĞŵďůLJ
Ϯϳ d/,ǁŝƚŚĐŽƌŝŶŐĂƐƐĞŵďůLJĂŶĚĐƵƚĐŽƌĞ͕dKK,
Ϯϴ d/,ǁŝƚŚďŝƚĂŶĚ,͕ƌĞƐƵŵĞĚƌŝůůŝŶŐ
Ϯϵ ƌŝůůŝŶƚĞƌŵĞĚŝĂƚĞŚŽůĞƚŽdĂƐĚŝƌĞĐƚĞĚďLJƌŝůůŝŶŐŶŐŝŶĞĞƌ;ĞƐƚŝŵĂƚĞĚϵ͕ϱϬϬΖͿ
ϯϬ ΘǁĞůů
ϯϭ dKK,
ϯϮ Zh,ǁŝƚŚůŽŐŐŝŶŐƚŽŽůƐ
ϯϯ ZƵŶĨƵůůůŽŐŐŝŶŐƐƵŝƚĞ
ϯϰ d/,ǁΖďŝƚƚŽĐůĞĂŶŚŽůĞ
ϯϱ ΘǁĞůů
ϯϲ dKK,
ϯϳ d/,ǁŝƚŚĂƐŝŶŐƚŽd͘WůĂĐĞƐƚĂŐĞƚŽŽůĂƐĚŝƌĞĐƚĞĚďLJŶŐŝŶĞĞƌŝŶŐ͕ƐƚŝŵĂƚĞĚϴ͕ϬϬϬΖds
ϯϴ >ĂŶĚĐĂƐŝŶŐŽŶŚĂŶŐĞƌ
ϯϵ Z/>^
ϰϬ WƌĞƐƐƵƌĞƚĞƐƚŚĂŶŐĞƌ
ϰϭ WƵŵƉĐĞŵĞŶƚƉĞƌĚĞƐŝŐŶ͕ƉůĂĐŝŶŐdKĂƚϲ͕ϱϬϬΖ
ϰϮ tK͕dĞƐƚKWΖƐ
ϰϯ ƵůůŚĞĂĚĚĞŝƐĞůƚŽĨƌĞĞnjĞƉƌŽƚĞĐƚĂŶŶƵůƵƐ
ϰϰ ƌƵŶ>ǁŝƚŚƚĞŵƉĞƌĂƚƵƌĞůŽŐ^ƵƌĨĂĐĞŚŽůĞĂŶĚĐĂƐŝŶŐEhKWΖƐƌŝůů/ŶƚĞƌŵĞĚŝĂƚĞ>ŽŐĂƐĞ0XGORJJLQJVHUYLFHVDQGFXWWLQJVVDPSOHVUHTXLUHGIURPVXUIDFH
WRWRWDOGHSWKRIWKHZHOO&XWWLQJVVDPSOHIUHTXHQF\SURYLGHGLQ
$2*&&
VDSSURYDOOHWWHUWKDWDFFRPSDQLHVWKLV3HUPLWWR'ULOO
6)'
0LQLPXPORJJLQJVXLWHUHTXLUHGIURPEDVHRIFRQGXFWRUSLSHWR
WRWDOGHSWKRIWKHZHOOZLOOFRQVLVWRIJDPPDUD\UHVLVWLYLW\DQG
SRURVLW\VRQLFDQGRUQHXWURQGHQVLW\FXUYHV*UHDW%HDU
V
JHQHUDOZHOOORJJLQJSURJUDP/:'DQGZLUHOLQHLVSURYLGHGLQWKH
DWWDFKHGHPDLOIURP0'XQFDQWR6'DYLHVGDWHG
5HYLVHG
6(&7,21E
7+(7$:(67:(//%25(
6&+(0$7,&
dŚĞƚĂtĞƐƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ
tĞůůďŽƌĞƐĐŚĞŵĂƚŝĐ
^ƵƌĨĂĐĞ,ŽůĞ ^ƵƌĨĂĐĞĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϭϮϭͬϰΗ ϵϱͬϴΗ ϰϬ ůďͬĨƚ >ͲϴϬ d
dK ĞƉƚŚ
^ƵƌĨĂĐĞ
WƌŽĚƵĐƚŝŽŶ,ŽůĞ WƌŽĚƵĐĂƚŝŽŶĂƐŝŶŐ tĞŝŐŚƚ 'ƌĂĚĞ ŽŶŶĞĐƚŝŽŶ
ϴϭͬϮΗ ϳΗ Ϯϲ ůďͬĨƚ WͲϭϭϬ d
dK͗ ĞƉƚŚ
WƌŽĚƵĐƚŝŽŶdƵďŝŶŐ Kd tĞŝŐŚƚ 'ƌĂĚĞ
ϲ͘ϱ ůďͬĨƚ >ͲϴϬ
,ƵĞͬ,ZƐŚĂůĞ
ϯϱϬϬ
ĂŶŶŝŶŐ^ŚĂůĞ
ϲϱϬϬ ϵϱϬϬ
Ϯϳͬϴ d
6(&7,21
',6326$/
*UHDW%HDU3DQWKHRQLQWHQGVWRGLVSRVHRIGULOOLQJPXGDQGFXWWLQJVDWWKH+LOFRUS*ULQGDQG
,QMHFWIDFLOLW\LQ3UXGKRH%D\,WLVWKHLQWHQWRI*UHDW%HDU3DQWKHRQWRUHTXHVWDXWKRUL]DWLRQ
XQGHU$$&IRUDQQXODUGLVSRVDORSHUDWLRQRIWKHZHOO
J JS
LQWHQWRI*UHDW%HDU3DQWKHRQWRUHTXHVWDXWKRUL]DWLRQM\ \
XQGHU$$&IRUDQQXODUGLVSRVDORSHUDWLRQRIWKHZHOO
'DYLHV6WHSKHQ)2*&
)URP0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
6HQW7XHVGD\'HFHPEHU30
7R'DYLHV6WHSKHQ)2*&
&F0F/HOODQ%U\DQ-2*&%R\HU'DYLG/2*&
6XEMHFW5(7KHWD:HVW37'4XHVWLRQV
/ƚŝƐůĞŐŝƚ͕ƐƉĞĐƐŚĞĞƚĨŽƌƚŚĞ,Ϯ^ƐĐĂǀĞŶŐĞƌ͘,ĞƌĞŝƐĂƐĐƌĞĞŶƐŚŽƚ
&ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗dƵĞƐĚĂLJ͕ĞĐĞŵďĞƌϭϰ͕ϮϬϮϭϯ͗ϯϵWD
dŽ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
Đ͗DĐ>ĞůůĂŶ͕ƌLJĂŶ:;K'ͿфďƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗&t͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲYƵĞƐƚŝŽŶƐ
,ŝDŝĐŚĂĞů͕
/͛ŵĂďŝƚŚĞƐŝƚĂŶƚƚŽĐůŝĐŬŽŶLJŽƵƌĂƚƚĂĐŚŵĞŶƚƚŚĂƚŝƐƚŝƚůĞĚ͞njŝŶĐͺŽdžŝĚĞ͘ƉĚĨ͘͟/ƐƚŚŝƐĂůĞŐŝƚŝŵĂƚĞĂƚƚĂĐŚŵĞŶƚ͍tŚĂƚĚŽĞƐ
ŝƚĐŽŶƚĂŝŶ͍
dŚĂŶŬƐĂŶĚƐƚĂLJƐĂĨĞ͕
^ƚĞǀĞĂǀŝĞƐ
ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ
;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ
ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ
ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘
&ƌŽŵ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ĞŶƚ͗dƵĞƐĚĂLJ͕ĞĐĞŵďĞƌϭϰ͕ϮϬϮϭϯ͗ϯϮWD
dŽ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗DĐ>ĞůůĂŶ͕ƌLJĂŶ:;K'ͿфďƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх͖ŵĂŶĚĂ
DĐĂůĞďфĂŵĐĐĂůĞďΛƉĂŶƚŚĞŽŶƌĞƐŽƵƌĐĞƐ͘ĐŽŵх͖ĚǁĂƌĚƵŶĐĂŶфĚΛĚƵŶĐĂŶƉĞƚƌŽ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲYƵĞƐƚŝŽŶƐ
Dƌ͘ĂǀŝĞƐʹ
WůĞĂƐĞƐĞĞŵLJƌĞƐƉŽŶƐĞƐďĞůŽǁŝŶƌĞĚ͘
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞůƵŶĐĂŶ
'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
&ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗dŚƵƌƐĚĂLJ͕ĞĐĞŵďĞƌϵ͕ϮϬϮϭϭϬ͗ϱϮD
dŽ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
Đ͗DĐ>ĞůůĂŶ͕ƌLJĂŶ:;K'ͿфďƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗Z͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲYƵĞƐƚŝŽŶƐ
DŝĐŚĂĞů͕
/ŚĂǀĞĂĨĞǁŵŽƌĞƋƵĞƐƚŝŽŶƐŝŶĂĚĚŝƚŝŽŶƚŽƚŚŽƐĞďĞůŽǁ͘dŽĂǀŽŝĚĐŽŶĨƵƐŝŽŶ͕ŚĞƌĞĂƌĞĂůůŽĨŵLJƋƵĞƐƚŝŽŶƐĐŽŶĐĂƚĞŶĂƚĞĚ
ŝŶƚŽĂƐŝŶŐůĞůŝƐƚ͘
xdŚŝƐŝƐĂŶĞdžƉůŽƌĂƚŽƌLJǁĞůů͘ŵƵĚůŽŐĂŶĚĐƵƚƚŝŶŐƐƐĂŵƉůĞƐǁŝůůďĞƌĞƋƵŝƌĞĚĨƌŽŵƐƵƌĨĂĐĞƚŽdĂůŽŶŐǁŝƚŚĐŚŝƉƐ
ĨƌŽŵĂŶLJĐŽŶǀĞŶƚŝŽŶĂůĐŽƌĞƐƌĞĐŽǀĞƌĞĚ͘;^ĞĞϮϬϮϱ͘Ϭϳϭ͘Ϳ/ĚŽŶ͛ƚƌĞĐĂůůƌĞĂĚŝŶŐĂŶLJƌĞĨĞƌĞŶĐĞƚŽŵƵĚ
ůŽŐŐŝŶŐƐĞƌǀŝĐĞƐŽƌƐĂŵƉůĞƐŝŶƚŚĞĂƉƉůŝĐĂƚŝŽŶ͘tŚĂƚĂƌĞ'ƌĞĂƚĞĂƌ͛ƐƉůĂŶƐ͍
^ůƵŵďĞƌŐĞƌŵƵĚůŽŐŐŝŶŐŝƐƉůĂŶŶĞĚ͘ƵƚƚŝŶŐƐǁŝůůďĞƚĂŬĞŶĨƌŽŵƐƵƌĨĂĐĞƚŽdŽŶƚŚĞĨŽůůŽǁŝŶŐƐĐŚĞĚƵůĞ;ŵŝŶŝŵƵŵ
ĨƌĞƋƵĞŶĐLJͿ͗
^ƵƌĨĂĐĞƚŽ<ͲϭϬ;ϱ͕ϯϵϬ͛Ϳʹ^ĂŵƉůĞƐĞǀĞƌLJϱϬ͛
<ͲϭϬƚŽdʹ^ĂŵƉůĞƐĞǀĞƌLJϯϬ͛
x^ŝŶĐĞƚŚŝƐŝƐĂƌĞŵŽƚĞĞdžƉůŽƌĂƚŽƌLJǁĞůů͕,Ϯ^ŵĞĂƐƵƌĞƐǁŝůůďĞƌĞƋƵŝƌĞĚ͘tŝůů,Ϯ^ƚƌĞĂƚŝŶŐŵĂƚĞƌŝĂůĨŽƌƚŚĞĚƌŝůůŝŶŐ
ŵƵĚďĞĂǀĂŝůĂďůĞŽŶŽƌŶĞĂƌƚŚĞǁĞůůůŽĐĂƚŝŽŶ͍
zĞƐĂŶĚzĞƐ͘,Ϯ^ŵŽŶŝƚŽƌŝŶŐŝƐŽŶƚŚĞƌŝŐ͕,Ϯ^ƐĐĂǀĞŶŐĞƌŝƐĂǀĂŝůĂďůĞŝŶĞĂĚŚŽƌƐĞ;^ƉĞĐƐŚĞĞƚĂƚƚĂĐŚĞĚͿ͘
dŚĞdŚĞƚĂtĞƐƚǁĞůůŝƐƚĞƐƚŝŶŐƐƚƌĂƚĂƉĞŶĞƚƌĂƚĞĚŝŶŵƵůƚŝƉůĞŽĨĨƐĞƚǁĞůůƐƚŚĂƚƌĞĐŽƌĚĞĚŶŽƐŝŐŶŝĨŝĐĂŶƚ,Ϯ^ŝŶƚŚĞ
ĞƋƵŝǀĂůĞŶƚƚĂƌŐĞƚƐĞĐƚŝŽŶ͘tŽůĨďƵƚƚŽŶϮϱͲϲͲϵĂŶĚdĂůŝƚŚĂĐĂŶďĞƚŝĞĚǁŝƚŚŽƵƌϯĚĂƚĂǁŝƚŚŐƌĞĂƚƉƌĞĐŝƐŝŽŶƉƌŽǀŝĚŝŶŐ
ŚŝŐŚĐŽŶĨŝĚĞŶĐĞƚŚĂƚ,Ϯ^ƐŚŽƵůĚŶŽƚďĞĞdžƉĞĐƚĞĚ͘
6RPHSHRSOHZKRUHFHLYHGWKLVPHVVDJHGRQ
WRIWHQJHWHPDLOIURPPLFKDHO#JUHDWEHDUSHWURFRP/HDUQZK\WKLVLVLPSRUWDQW
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
x>ŽŐŐŝŶŐƉƌŽŐƌĂŵƐĂƌĞŽŶůLJďƌŝĞĨůLJŵĞŶƚŝŽŶĞĚŝŶƚŚĞƌŝůůŝŶŐWƌŽŐƌĂŵ͘tŚĂƚƐƉĞĐŝĨŝĐƚŽŽůƐǁŝůůďĞƌƵŶŝŶĞĂĐŚ
ƉŽƌƚŝŽŶŽĨƚŚĞǁĞůů͍,ĞƌĞĂƌĞƚŚĞůŽŐŐŝŶŐƌƵŶƐƉůĂŶŶĞĚ͘WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞ&D/ŝƐůŝŬĞůLJǁŝƌĞůŝŶĞ͕ďƵƚŵĂLJďĞ
ŵŽǀĞĚƚŽ>t
>t
xdƌŝƉůĞŽŵďŽ
xŝƌĞĐƚŝŽŶĂů
tŝƌĞůŝŶĞ>ŽŐŐŝŶŐ͗
xWyʹ^ƉĞĐƚƌĂů'ZʹDZ
x&D/
xK,'Zʹy>ͲZŽĐŬ^t;ϱϬĐŽƌĞƐͿ
xDdĚƵĂůƉĂĐŬĞƌĨŽƌƉƌĞƐƐƵƌĞƐĂŶĚƐĂŵƉůŝŶŐ;ϭϮϰϬϬĐĐƐĂŵƉůĞƐʹϭŐĂůůŽŶƐĂŵƉůĞͿ
x,ĂƐ'ƌĞĂƚĞĂƌƐƵďŵŝƚƚĞĚŽŶĚϬϭϯϳϳϴƚŽƚŚĞK'͍/ůŽŽŬĞĚďƌŝĞĨůLJƚŽĚĂLJďƵƚĚŝĚŶŽƚĨŝŶĚŝƚ͘
tŝůůďĞƐƵďŵŝƚƚĞĚdŚƵƌƐĚĂLJ
x&ŽƌdŚĞƚĂtĞƐƚϭ͕'ƌĞĂƚĞĂƌŝƐƉƌŽƉŽƐŝŶŐƚŽƐĞƚƐƵƌĨĂĐĞĐĂƐŝŶŐĂƚϯϱϬϬΖDͬds͘dŚŝƐŝƐĚĞĞƉĞƌƚŚĂŶƐƵƌĨĂĐĞ
ĐĂƐŝŶŐƉŽŝŶƚƐĨŽƌƚŚĞƐŝdžŶĞĂƌĞƐƚ;ǁŝƚŚŝŶϭϱŵŝůĞƐͿƐƵƌƌŽƵŶĚŝŶŐǁĞůůƐ͕ǁŚŝĐŚƌĂŶŐĞĨƌŽŵϮϰϬϭΖD;ϮϬϬϲΖdsͿŝŶ
tŽůĨďƵƚƚŽŶϮϱͲϲͲϵƚŽϯϯϮϭΖD;ϯϯϮϬΖdsͿŝŶůŬĂŝĚϭ͘^ƵƌĨĂĐĞĐĂƐŝŶŐĚĞƉƚŚƐĨŽƌƚŚĞƐĞƐŝdžŶĞĂƌĞƐƚǁĞůůƐĂǀĞƌĂŐĞ
ϮϱϭϯΖds͘tŚĂƚŝƐƚŚĞďĂƐŝƐĨŽƌ'ƌĞĂƚĞĂƌΖƐƉƌŽƉŽƐĂůƚŽƐĞƚƐƵƌĨĂĐĞĐĂƐŝŶŐĂƚϯϱϬϬΖDͬdsŝŶƚŚŝƐĞdžƉůŽƌĂƚŽƌLJ
ǁĞůů͕ǁŚŝĐŚŝƐƌŽƵŐŚůLJϳͲϭͬϰŵŝůĞƐĨƌŽŵƚŚĞŶĞĂƌĞƐƚǁĞůů͍tŚĂƚŵŽŶŝƚŽƌŝŶŐĞƋƵŝƉŵĞŶƚĂŶĚƉƌŽĐĞĚƵƌĞƐǁŝůůďĞŝŶ
ƉůĂĐĞƚŽĞŶƐƵƌĞƐĂĨĞŽƉĞƌĂƚŝŽŶƐǁŚŝůĞĚƌŝůůŝŶŐƐƵƌĨĂĐĞŚŽůĞ͍
'ƌĞĂƚƋƵĞƐƚŝŽŶ͘/ĞdžƉĞĐƚƚŚĞĨŝŶĂůdƚŽďĞĐĂůůĞĚǁŝƚŚƚŚĞŐƵŝĚĂŶĐĞŽĨ͗͞ĐƵƚƉĂƐƚϯϬϬϬ͛ĂŶĚĐŽƌƌĞůĂƚĞƚŽĂŐŽŽĚƐŚĂůĞ͘͟
hůƚŝŵĂƚĞůLJƚŚŝƐĨŝŶĂůĐĂůůŝƐŵĞĂŶƚƚŽďĞĚŽŶĞŽŶůŽĐĂƚŝŽŶďĂƐĞĚŽŶƚŚĞĐŽƌƌĞůĂƚŝŽŶĨƌŽŵdĂůŝƚŚĂĂŶĚƚŚĞƐĞŝƐŵŝĐ͘tĞƐĞĞ
ŐŽŽĚŵĂƌŝŶĞƐŚĂůĞƐŶĞĂƌƚŚĞƚŽƉtĞƐƚ^ĂŬĂŶĚĐĂŶĐŽƌƌĞůĂƚĞƚŚĞƐĞŝŶƚŽƚŚĞdŚĞƚĂtĞƐƚůŽĐĂƚŝŽŶǁŝƚŚŽƵƌϯ͘Ƶƚ͕ƚŚĞ
ƐƵƌĨĂĐĞĐƐŐƉŽŝŶƚǁŝůůďĞĐĂůůĞĚĂƚƚŚĞǁĞůůƐŝƚĞĨƌŽŵƚŚĞďĞƐƚĚĂƚĂǁĞŚĂǀĞŝŶŚĂŶĚ͘
DĂŶLJŽĨŵLJŵĞŶƚŽƌƐŚĂǀĞŚĂĚǀĂƌLJŝŶŐǀŝĞǁƐŽŶƚŚŝƐ͘ϮϱϬϬŝƐĂĐŽŵŵŽŶĐŚŽŝĐĞĂŶĚĂŐŽͲƚŽĨƌŽŵŝůůWĞŶƌŽƐĞ͘/ƐĞĞŬƚŽŐŽ
ĂůŝƚƚůĞĚĞĞƉĞƌĨŽƌƐŚŽĞƐƚƌĞŶŐƚŚ͘tĞŚĂǀĞŶŽŝŶĚŝĐĂƚŝŽŶŽĨŐĂƐŚĂnjĂƌĚƐŝŶƚŚĞĂƌĞĂ͘dĂůŝƚŚĂǁĂƐĐĂůůĞĚďĞĨŽƌĞϯϮϬϬ͕͛
ůŬĂŝĚϯϯϮϭ͕
dŽŵŽŶŝƚŽƌƚŚĞǁĞůůǁĞǁŝůůƵƐĞƐƚĂŶĚĂƌĚƉƌĂĐƚŝĐĞƐ͘&ŝƌƐƚĂŶĚĨŽƌĞŵŽƐƚŝƐǀŝƐĐŽƵƐĂŶĚŚĞĂǀLJŵƵĚ͘tĞĂŶƚŝĐŝƉĂƚĞĐƵƚƚŝŶŐ
ƚŚĞďĂƐĞƉĞƌŵĂĨƌŽƐƚĂƚϵ͘ϱƉƉŐ͘tĞǁŝůůĂůƐŽƵƐĞǁĞůůĐŽŶƚƌŽůƉƌĂĐƚŝĐĞƐŝŶĐůƵĚŝŶŐƉŝƚůĞǀĞůĂůĂƌŵƐ͕ĐŽŶŶĞĐƚŝŽŶŵŽŶŝƚŽƌŝŶŐ͕
ĞƚĐ͘
x'ƌĞĂƚĞĂƌƉƌŽƉŽƐĞƐƚŽĚƌŝůůŽƵƚŽĨƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐƐŚŽĞǁŝƚŚϵ͘ϬŵƵĚ͕ǁŚŝĐŚƐĞĞŵƐůŝŐŚƚǁŚĞŶĐŽŵƉĂƌĞĚƚŚĞ
ŵƵĚǁĞŝŐŚƚƐƵƐĞĚƚŽĚƌŝůůƐŝŵŝůĂƌĚĞƉƚŚƐŝŶŽƚŚĞƌĞdžƉůŽƌĂƚŽƌLJǁĞůůƐŝŶƚŚŝƐƉŽƌƚŝŽŶŽĨƚŚĞEŽƌƚŚ^ůŽƉĞ͘tŚĂƚŝƐ
'ƌĞĂƚĞĂƌΖƐďĂƐŝƐĨŽƌƐĞůĞĐƚŝŶŐƚŚŝƐƉĂƌƚŝĐƵůĂƌŵƵĚǁĞŝŐŚƚ͍
dŚĞŵĂŝŶďĂƐŝƐŝƐĂƉŚŝůŽƐŽƉŚLJŽĨŵĂŝŶƚĂŝŶŝŶŐŵƵĚǁĞŝŐŚƚƐĐůŽƐĞƌƚŽďĂůĂŶĐĞƚŚĂŶŚŝƐƚŽƌŝĐĂůůLJƵƐĞĚ͘dŚĞƌĞŝƐƐŝŐŶŝĨŝĐĂŶƚ
ǁĞůůƐƚƌĞŶŐƚŚŽƌ͞ŬŝĐŬƚŽůĞƌĂŶĐĞ͕͟ĞƐƉĞĐŝĂůůLJƐŚĂůůŽǁ͘tŚĞŶǁĞŚĂǀĞůŽŽŬĞĚĂƚƚŚĞƌŽŽŬŝĂŶĂŶĚƚĞƐƚĞĚŝŶůŬĂŝĚ͕ǁĞƐĞĞ
ƉŽƌĞƉƌĞƐƐƵƌĞƐĐůŽƐĞƌƚŽĂŶŽƌŵĂůƉƌĞƐƐƵƌĞŐƌĂĚŝĞŶƚ͘/ĂŶƚŝĐŝƉĂƚĞϴ͘ϳͲϴ͘ϴƉƉŐĞƋƵŝǀĂůĞŶƚƉŽƌĞƉƌĞƐƐƵƌĞƚŚƌŽƵŐŚƚŚĞ
ŝŶƚĞƌǀĂů͘/ĨƚŚĞŵƵĚŝƐŚĞĂǀLJ͕ĞǀĞƌLJƚŚŝŶŐŐĞƚƐŚĂƌĚĞƌ͘ĞŵĞŶƚŝŶŐŝƐŵŽƌĞĚŝĨĨŝĐƵůƚ͕ŝŶǀĂƐŝŽŶĂŶĚďŽƌĞŚŽůĞƐƚĂďŝůŝƚLJ
ĐŚĂŶŐĞ͘
x'ƌĞĂƚĞĂƌƉƌŽƉŽƐĞƐƚŽĚƌŝůůƚŚĞůŽǁĞƌƉŽƌƚŝŽŶƐŽĨdŚĞƚĂtĞƐƚϭǁŝƚŚϵ͘ϱŵƵĚ͕ǁŚŝĐŚĂůƐŽƐĞĞŵƐůŝŐŚƚǁŚĞŶ
ĐŽŵƉĂƌĞĚƚŚĞŵƵĚǁĞŝŐŚƚƐƵƐĞĚƚŽĚƌŝůůƐŝŵŝůĂƌĚĞƉƚŚƐŝŶŽƚŚĞƌĞdžƉůŽƌĂƚŽƌLJǁĞůůƐǁŝƚŚŝŶƚŚŝƐĂƌĞĂ͘ĂƵƚŝŽŶŝƐ
ǁĂƌƌĂŶƚĞĚĂƐƐŚŽǁŶďLJtŽůĨďƵƚƚŽŶϮϱͲϲͲϵǁŚĞƌĞŵƵĚǁĞŝŐŚƚǁĂƐĐƵƚĨƌŽŵϭϬ͘ϱƚŽϵ͘ϯƉƉŐĂƚϭϬ͕ϬϱϳΖD
;ϭϬ͕ϬϱϱΖdsͿ͕ƚŚĞŶƌĂŝƐĞĚƚŽϭϬ͘ϳƉƉŐ͕ǁŚŝĐŚƌĞƐƵůƚĞĚŝŶĨůƵŝĚůŽƐƐ͕ƚŚĞŶĐŽŶƚƌŽůǁĂƐƌĞŐĂŝŶĞĚďLJĐƵƚƚŝŶŐƚŚĞŵƵĚ
ǁĞŝŐŚƚƚŽϭϬ͘ϲƉƉŐ͘ůƐŽ͕ĞůĞǀĂƚĞĚŐĂƐŵĞĂƐƵƌĞŵĞŶƚƐ;ĂƐŚŝŐŚĂƐϮϴϱϲƵŶŝƚƐͿŝŶƚŚĞůŽǁĞƌƉŽƌƚŝŽŶƐŽĨdĂůŝƚŚĂ
ƉŝůŽƚŚŽůĞǁŚŝůĞĚƌŝůůŝŶŐǁŝƚŚϵ͘ϱƉƉŐŵƵĚ͘tŚĂƚŝƐ'ƌĞĂƚĞĂƌΖƐďĂƐŝƐĨŽƌƐĞůĞĐƚŝŶŐƚŚŝƐƉĂƌƚŝĐƵůĂƌŵƵĚǁĞŝŐŚƚĨŽƌ
ĚƌŝůůŝŶŐƚŚĞďĂƐĂůƉŽƌƚŝŽŶƐŽĨdŚĞƚĂtĞƐƚϭ͍ƐďĞĨŽƌĞ͕ǁŚĂƚŵŽŶŝƚŽƌŝŶŐŵĞĂƐƵƌĞƐĂŶĚƉƌŽĐĞĚƵƌĞƐǁŝůůďĞŝŶ
ƉůĂĐĞƚŽĞŶƐƵƌĞƐĂĨĞŽƉĞƌĂƚŝŽŶƐ͍tŝůůĂĚĚŝƚŝŽŶĂůŵƵĚƐƵƉƉůŝĞƐďĞĂǀĂŝůĂďůĞŽŶƐŝƚĞƚŽƌĂŝƐĞŵƵĚǁĞŝŐŚƚƚŽĂƚůĞĂƐƚ
ϭƉƉŐĂďŽǀĞƚŚĞŐƌĞĂƚĞƐƚĂŶƚŝĐŝƉĂƚĞĚŵƵĚǁĞŝŐŚƚ͍
tĞŚĂǀĞƐĞĞŶĂŵƉůĞĞǀŝĚĞŶĐĞƚŚĂƚƚŚĞ,ZŝƐĂƉƌĞƐƐƵƌĞƚƌĂŶƐŝƚŝŽŶnjŽŶĞ͘dŚĞ<ƵƉĂƌƵŬďĞůŽǁǁĂƐĂŵƵĐŚŚŝŐŚĞƌƉŽƌĞ
ƉƌĞƐƐƵƌĞŝŶdĂůŝƚŚĂ;ϭϮ͘ϭƉƉŐͿ͘ǀŝĚĞŶĐĞƐĞĞŶŝŶƚŚĞůŬĂŝĚ͕ůĐŽƌ͕DĞƌĂŬĂŶĚŝŶƚŚĞdĂůŝƚŚĂƌŽŽŬŝĂŶ;ĚƌŝůůĞĚǁŝƚŚϵ͘ϭ
ƉƉŐŵƵĚͿƐƵƉƉŽƌƚƐĂŶŽƌŵĂůůLJƉƌĞƐƐƵƌĞĚƌŽŽŬŝĂŶ͘
^ŝŵŝůĂƌƚŽƚŚĞĞǀĞŶƚƐŵĞŶƚŝŽŶĞĚĂďŽǀĞĂƚƚŚĞtŽůĨďƵƚƚŽŶ͕ƚŚĞůŬĂŝĚǁĞůůŚĂĚĂůŽƐƚĐŝƌĐƵůĂƚŝŽŶƐĞŐŵĞŶƚŝŶƚŚĞƌŽŽŬŝĂŶ͘
^ŽĚŝĚƚŚĞůĐŽƌ͘,ĞĂǀLJŵƵĚǁĞŝŐŚƚƐĐĂŶďĞůŽƐƚ͘/ĨƐŚŽĞƐƚƌĞŶŐƚŚŝƐŐŽŽĚ͕ĂŶĚϯůĞǀĞůƐŽĨKWƐƌĞŐƵůĂƌůLJƚĞƐƚĞĚ͕ƚŚĞŶ
ĂŵƉůĞǁĞůůĐŽŶƚƌŽůŝƐĂǀĂŝůĂďůĞ;ϯůĂLJĞƌƐ͗DƵĚ͕WŝƉĞZĂŵƐ͕ŶŶƵůĂƌƉƌĞǀĞŶƚĞƌƐͿ͘KƵƌŝŶƚĞŶƚŝƐƚŽďĞŽǀĞƌďĂůĂŶĐĞƐ͕ďƵƚŶŽƚ
ƐŝŐŶŝĨŝĐĂŶƚůLJ͘
dŚĂŶŬƐĂŐĂŝŶĨŽƌLJŽƵƌŚĞůƉĂŶĚƐƚĂLJƐĂĨĞ͕
^ƚĞǀĞĂǀŝĞƐ
K'
KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ
;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ
ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ
ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘
&ƌŽŵ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ĞĐĞŵďĞƌϴ͕ϮϬϮϭϮ͗ϱϬWD
dŽ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗Z͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲYƵĞƐƚŝŽŶƐ
Dƌ͘ĂǀŝĞƐʹ
^ŽƌƌLJŶŽƚƚŽƌĞƐƉŽŶĚƐŽŽŶĞƌ͘/ǁŝůůĨŽĐƵƐŽŶƚŚŝƐĚŝƌĞĐƚůLJĂŶĚ/ŚŽƉĞƚŽŚĂǀĞƚŚŝƐƚŽLJŽƵƐŚŽƌƚůLJ͘
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞů
&ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗DŽŶĚĂLJ͕ĞĐĞŵďĞƌϲ͕ϮϬϮϭϰ͗ϱϮWD
dŽ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
Đ͗ZŽďLJ͕ĂǀŝĚ^;K'ͿфĚĂǀĞ͘ƌŽďLJΛĂůĂƐŬĂ͘ŐŽǀх͖DĐ>ĞůůĂŶ͕ƌLJĂŶ:;K'ͿфďƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>
;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲYƵĞƐƚŝŽŶƐ
,ŝDŝĐŚĂĞů͕
/͛ŵƌĞǀŝĞǁŝŶŐƚŚĞůĂŶĚĂĚŵŝŶŝƐƚƌĂƚŝŽŶĂŶĚŐĞŽůŽŐLJƉŽƌƚŝŽŶƐŽĨ'ƌĞĂƚĞĂƌ͛ƐWĞƌŵŝƚƚŽƌŝůůĨŽƌdŚĞƚĂtĞƐƚηϭ͕ĂŶĚ/ŚĂǀĞ
ĂĨĞǁƋƵĞƐƚŝŽŶƐƐŽĨĂƌ͗
xdŚŝƐŝƐĂŶĞdžƉůŽƌĂƚŽƌLJǁĞůů͘ŵƵĚůŽŐĂŶĚĐƵƚƚŝŶŐƐƐĂŵƉůĞƐǁŝůůďĞƌĞƋƵŝƌĞĚĨƌŽŵƐƵƌĨĂĐĞƚŽdĂůŽŶŐǁŝƚŚĐŚŝƉƐ
ĨƌŽŵĂŶLJĐŽŶǀĞŶƚŝŽŶĂůĐŽƌĞƐƌĞĐŽǀĞƌĞĚ͘;^ĞĞϮϬϮϱ͘Ϭϳϭ͘Ϳ/ĚŽŶ͛ƚƌĞĐĂůůƌĞĂĚŝŶŐĂŶLJƌĞĨĞƌĞŶĐĞƚŽŵƵĚ
ůŽŐŐŝŶŐƐĞƌǀŝĐĞƐŽƌƐĂŵƉůĞƐŝŶƚŚĞĂƉƉůŝĐĂƚŝŽŶ͘tŚĂƚĂƌĞ'ƌĞĂƚĞĂƌ͛ƐƉůĂŶƐ͍
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
x^ŝŶĐĞƚŚŝƐŝƐĂƌĞŵŽƚĞĞdžƉůŽƌĂƚŽƌLJǁĞůů͕,Ϯ^ŵĞĂƐƵƌĞƐǁŝůůďĞƌĞƋƵŝƌĞĚ͘tŝůů,Ϯ^ƚƌĞĂƚŝŶŐŵĂƚĞƌŝĂůĨŽƌƚŚĞĚƌŝůůŝŶŐ
ŵƵĚďĞĂǀĂŝůĂďůĞŽŶŽƌŶĞĂƌƚŚĞǁĞůůůŽĐĂƚŝŽŶ͍
x>ŽŐŐŝŶŐƉƌŽŐƌĂŵƐĂƌĞŽŶůLJďƌŝĞĨůLJŵĞŶƚŝŽŶĞĚŝŶƚŚĞƌŝůůŝŶŐWƌŽŐƌĂŵ͘tŚĂƚƐƉĞĐŝĨŝĐƚŽŽůƐǁŝůůďĞƌƵŶŝŶĞĂĐŚ
ƉŽƌƚŝŽŶŽĨƚŚĞǁĞůů͍
x,ĂƐ'ƌĞĂƚĞĂƌƐƵďŵŝƚƚĞĚŽŶĚϬϭϯϳϳϴƚŽƚŚĞK'͍/ůŽŽŬĞĚďƌŝĞĨůLJƚŽĚĂLJďƵƚĚŝĚŶŽƚĨŝŶĚŝƚ͘
dŚĂŶŬƐĂŶĚƐƚĂLJƐĂĨĞ͕
^ƚĞǀĞĂǀŝĞƐ
ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ
KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ
;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ
ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ
ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘
&DUOLVOH6DPDQWKD-2*&
)URP/RHSS9LFWRULD72*&
6HQW0RQGD\-DQXDU\$0
7R/RHSS9LFWRULD72*&
6XEMHFW7KHWD:HVW37'37'TXHVWLRQV
$WWDFKPHQWV&HPHQW<LHOG&DOFVSGI7KHWD:HVW'ULOOLQJ3URFHGXUH-DQXDU\SGI
&ƌŽŵ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ĞŶƚ͗^ƵŶĚĂLJ͕:ĂŶƵĂƌLJϵ͕ϮϬϮϮϯ͗ϯϳWD
dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх͖ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх͖ŵĂŶĚĂ
DĐĂůĞďфĂŵĐĐĂůĞďΛƉĂŶƚŚĞŽŶƌĞƐŽƵƌĐĞƐ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲWdƋƵĞƐƚŝŽŶƐ
sŝĐƚŽƌŝĂʹ
WůĞĂƐĞƐĞĞƚŚĞĂƚƚĂĐŚĞĚĂŵĞŶĚĞĚƉƌŽĐĞĚƵƌĞĂŶĚĐĞŵĞŶƚLJŝĞůĚĐĂůĐƐ͘
tŝƚŚƌĞŐĂƌĚƚŽƚŚĞĐĞŵĞŶƚ͕ŵŽƐƚǁŝůůďĞƚƌĂŶƐƉŽƌƚĞĚŝŶďƵůŬ͘/ŚĂǀĞŝŶĐůƵĚĞĚ͞ƐŝŶŐůĞƐĂĐŬ͟ĐĂůĐƵůĂƚŝŽŶƐǁŝƚŚĞĂĐŚĚĞƐŝŐŶ
ƐĞƚƚŽƐŚŽǁƚŚĞĞƐƚŝŵĂƚĞĚLJŝĞůĚĂŶĚĚĞŶƐŝƚŝĞƐ͘
ZĂŵĐŚĂŶŐĞƐĂƌĞŶŽǁŝŶĐůƵĚĞĚŝŶƚŚĞƉƌŽĐĞĚƵƌĞ͕ƐƚĞƉŶƵŵďĞƌϯϳǁŚŝĐŚŝƐŚŝŐŚůŝŐŚƚĞĚŝŶLJĞůůŽǁ͘dŚĞƌĞĂƌĞƚǁŽŽƚŚĞƌ
ŶŽƚĞǁŽƌƚŚLJĐŚĂŶŐĞƐ͘&ŝƌƐƚ͕ƚŚĞůĞĂĚƚŝŵĞƐŽŶƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐƐƚĂŐĞƚŽŽůǁĞŚĂĚŝĚĞŶƚŝĨŝĞĚĂƌĞƚŽŽůŽŶŐĂŶĚǁĞǁŝůůŶŽƚ
ŚĂǀĞƚŚĞƚŽŽůŝŶƚŝŵĞ͘dŚƵƐƚŚĞĐŽŶƚŝŶŐĞŶĐLJƉůĂŶ͕ƐŚŽƵůĚĐĞŵĞŶƚ ŶŽƚƌĞĂĐŚƐƵƌĨĂĐĞ͕ŝƐĂ͞ƚŽƉũŽď͘͟
^ĞĐŽŶĚ͕ƐƵƌǀĞLJƚŽŽůƐǁŝůůďĞƵƐĞĚŽŶ>tŝŶƚŚĞƐƵƌĨĂĐĞ͕ƚŚŝƐĂƚŚĞϱϬϬ͛ƐƵƌǀĞLJƐƚŽƉƐ;ƐƚĞƉϭϵͿĂƌĞƌĞĚƵŶĚĂŶƚĂŶĚŚĂǀĞ
ďĞĞŶƌĞŵŽǀĞĚ͘
DŝŶŝŵƵŵ>KdĂŶĚƚŚĞ>KdƐŚŽƵůĚƚŚĞ<ƵƉĂƌƵŬďĞĐƵƚǁĞƌĞŝŶĐůƵĚĞĚŝŶĂƐĞƉĂƌĂƚĞĞŵĂŝůĂŶĚ/ďĞůŝĞǀĞ/ŚĂǀĞƐĞŶƚǁŚĂƚ
ǁĂƐƌĞƋƵĞƐƚĞĚ͘WůĞĂƐĞůĞƚŵĞŬŶŽǁŝĨŵŽƌĞŝƐŶĞĐĞƐƐĂƌLJ͘
ƐĨŽƌĨƵƚƵƌĞƉůĂŶƐ͕ǁĞƵůƚŝŵĂƚĞůLJŝŶƚĞŶĚƚŽƉůƵŐƚŚĞǁĞůůŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚK'ƉůƵŐŐŝŶŐƌĞƋƵŝƌĞŵĞŶƚƐ͘^ŚŽƵůĚ
ĨŽƌŵĂƚŝŽŶƐďĞĞŶĐŽƵŶƚĞƌĞĚĂƐŚŽƉĞĚ͕ǁĞĨŝƌƐƚŝŶƚĞŶĚƚŽĐŽŵƉůĞƚĞĂŶĚĨůŽǁƚĞƐƚ͘dŚĞƐĞĐŽŵƉůĞƚŝŽŶŵĞƚŚŽĚƐǁŝůůďĞ
ǁƌŝƚƚĞŶŽŶĐĞƉĂLJŝƐĐƵƚĂŶĚĞǀĂůƵĂƚĞĚ͘tĞƉůĂŶƚŽƐƵďŵŝƚƚŚĞƌĞƋƵŝƌĞĚĐŽŵƉůĞƚŝŽŶĂŶĚƉůƵŐŐŝŶŐƐƵŶĚƌŝĞƐŶĞĐĞƐƐĂƌLJĨŽƌ
ƚŚĞĂĐƚŝŽŶĂƉƉƌŽƉƌŝĂƚĞĨŽƌƚŚĞĨŽƌŵĂƚŝŽŶƐůŽŐŐĞĚ͘&ŝŶŐĞƌƐĐƌŽƐƐĞĚǁĞǁŝůůŚĂǀĞŐŽŽĚƉĂLJƚŽĨůŽǁƚĞƐƚďĞĨŽƌĞƉůƵŐŐŝŶŐ͘
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞůƵŶĐĂŶ
'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
ϴϭϳ͘ϮϰϬ͘ϯϴϲϱ
&ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕:ĂŶƵĂƌLJϱ͕ϮϬϮϮϭ͗ϮϰWD
dŽ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
Đ͗ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх͖ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲWdƋƵĞƐƚŝŽŶƐ
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
DŝĐŚĂĞů͕
ϭ͘WůĞĂƐĞƉƌŽǀŝĚĞĐĞŵĞŶƚŝŶŐĚĞƚĂŝůƐƐƵĐŚĂƐƐĂĐŬƐ͕LJŝĞůĚ͘
Ϯ͘WůĞĂƐĞŝŶĐůƵĚĞƌĂŵĐŚĂŶŐĞƐĨŽƌĞĂĐŚƉŝƉĞƌƵŶŝŶƚŚĞƉƌŽĐĞĚƵƌĞ͘
ϯ͘/ŶĐůƵĚĞŵŝŶ>KdŝŶƉƌŽĐĞĚƵƌĞ
ϰ͘tŚĂƚǁŽƵůĚďĞƚŚĞŵŝŶŝŵƵŵ>KdĂƚ^ƐŚŽĞƌĞƋƵŝƌĞĚŝĨƚŚĞ<ƵƉĂƌƵŬŝƐĞŶĐŽƵŶƚĞƌĞĚ͍
ϱ͘tŚĂƚĂƌĞĨƵƚƵƌĞƉůĂŶƐ͍,ŽǁĚŽLJŽƵƉůĂŶƚŽůĞĂǀĞƚŚŝƐǁĞůů͍
sŝĐƚŽƌŝĂ
&ƌŽŵ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕:ĂŶƵĂƌLJϱ͕ϮϬϮϮϭϮ͗ϬϲWD
dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх͖ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх͖ŵĂŶĚĂ
DĐĂůĞďфĂŵĐĐĂůĞďΛƉĂŶƚŚĞŽŶƌĞƐŽƵƌĐĞƐ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲ<ŝĐŬƚŽůĞƌĂŶĐĞ
,ĞůůŽsŝĐƚŽƌŝĂʹ
ƚƚĂĐŚĞĚŝƐĂƐƉƌĞĂĚƐŚĞĞƚǁŝƚŚŬŝĐŬƚŽůĞƌĂŶĐĞĐĂůĐƐ͘/ŚĂǀĞĚŽŶ͛ƚƚǁŽƉĂŐĞƐƚŽƌĞĨůĞĐƚƚŚĞǁĞůůƉŽƐƐŝďŝůŝƚŝĞƐ͘zŽƵǁŝůůƐĞĞ
ƚŚĂƚ/ŚĂǀĞĚŽŶĞƚŚĞĐĂůĐƵůĂƚŝŽŶǁŝƚŚƐƵƌĨĂĐĞĐĂƐŝŶŐƐŚŽĞĂƚϯ͕ϬϬϬ͛͘dŚŝƐŝƐƚŽƌĞĨůĞĐƚƚŚĂƚǁĞƐŚŽƵůĚĐĂůůdĂĨƚĞƌƚŚŝƐ
ĚĞƉƚŚ͕ďƵƚƚŚĞϯ͕ϬϬϬŝƐĂŵŽƌĞĐŽŶƐĞƌǀĂƚŝǀĞĂƐƐƵŵƉƚŝŽŶ͘dŚĞƚŽƚĂůĚĞƉƚŚŝƐĐĂůĐƵůĂƚĞĚĂƚϵ͕ϱϬϬĂŶĚϵ͕ϬϬϬ͘dŚĞϵ͕ϱϬϬ
ƌĞĨůĞĐƚƐƚŚĞǁĞůůďŽƌĞƐĐŚĞŵĂƚŝĐĂŶĚƚŚĞĞĂƌůLJĞŶŐŝŶĞĞƌŝŶŐĚĞƐŝŐŶ͘dŚŝƐĐĂůĐƵůĂƚŝŽŶǁŝůůďĞƚŚĞŵŽƐƚĐŽŶƐĞƌǀĂƚŝǀĞ͘Ɛ
ĐĂůĐƵůĂƚĞĚ͕ĂŬŝĐŬƚŽůĞƌĂŶĐĞŝƐϮϯ͘ϯďďůĚŽǁŶŚŽůĞ͕Žƌϯϵ͘ϴďďůĂƚƚŚĞƐŚŽĞ͘
ƐŵĞŶƚŝŽŶĞĚŝŶŽƚŚĞƌĞŵĂŝůƐ͕ǁĞƉůĂŶƚŽdĂƚƚŚĞƚŽƉŽĨƚŚĞ,ZǁŚŝĐŚƐŚŽƵůĚďĞƐŚĂůůŽǁĞƌƚŚĂŶϵ͕ϱϬϬ͘dŚƵƐ/ŚĂǀĞ
ŝŶĐůƵĚĞĚĂŶŽƚŚĞƌĐĂůĐƵůĂƚŝŽŶƌĞĨůĞĐƚŝŶŐĂdĂƚϵ͕ϬϬϬ͘ƐĞdžƉĞĐƚĞĚ͕ƚŚĞŬŝĐŬƚŽůĞƌĂŶĐĞŝƐƐůŝŐŚƚůLJŚŝŐŚĞƌ͕Ϯϱ͘ϳďďůĚŽǁŶ
ŚŽůĞ͕Žƌϰϭ͘ϲďďůĂƚƚŚĞƐŚŽĞ͘
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞůƵŶĐĂŶ
&ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕:ĂŶƵĂƌLJϱ͕ϮϬϮϮϭϬ͗ϮϳD
dŽ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
Đ͗ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх͖ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗Z͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲ<ŝĐŬƚŽůĞƌĂŶĐĞ
DŝĐŚĂĞů͕
WůĞĂƐĞƉƌŽǀŝĚĞŬŝĐŬƚŽůĞƌĂŶĐĞĐĂůĐƵůĂƚŝŽŶƐĨŽƌƚŚĞ^ƐŚŽĞ͘
dŚĂŶdž͕
sŝĐƚŽƌŝĂ
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
^ƵƌĨĂĐĞĂƐŝŶŐĞŵĞŶƚzŝĞůĚĂůĐƐ'ĂůůŽŶƐtĂƚĞƌtĞŝŐŚƚĞŵĞŶƚtĞŝŐŚƚdŽƚĂůtĞŝŐŚƚzŝĞĚ;ŐĂůůŽŶƐͿĞŶƐŝƚLJϭϯ͘ϭϵϰϭϬϵ͘ϵϬϲϬϮϭϬϬϮϬϵ͘ϵϬϲϬϮϮϬ͘ϳϭϵϲϭϬ͘ϭϯϬϳϵ'ĂůůŽŶƐtĂƚĞƌtĞŝŐŚƚĞŵĞŶƚtĞŝŐŚƚdŽƚĂůtĞŝŐŚƚzŝĞĚ;ŐĂůůŽŶƐͿĞŶƐŝƚLJϯ͘ϲϴϯϬ͘ϲϵϳϵ͘ϳϰϭϭϬ͘ϰϯϳ͘Ϭϯϭϱ͘ϳϭ^ŝŶŐůĞ^ĂĐŬĂůĐƵůĂƚŝŽŶ^ŝŶŐůĞ^ĂĐŬĂůĐƵůĂƚŝŽŶ
WƌŽĚƵĐƚŝŽŶĂƐŝŶŐĞŵĞŶƚzŝĞůĚĂůĐƐ'ĂůůŽŶƐtĂƚĞƌtĞŝŐŚƚĞŵĞŶƚtĞŝŐŚƚdŽƚĂůtĞŝŐŚƚzŝĞĚ;ŐĂůůŽŶƐͿĞŶƐŝƚLJϱ͘ϭϭϰϮ͘ϱϯϵϰ͘ϬϬϭϯϲ͘ϱϯϴ͘ϲϴϭϱ͘ϳϰ^ŝŶŐůĞ^ĂĐŬĂůĐƵůĂƚŝŽŶ
&DUOLVOH6DPDQWKD-2*&
)URP0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
6HQW)ULGD\-DQXDU\30
7R/RHSS9LFWRULD72*&
&F%R\HU'DYLG/2*&'DYLHV6WHSKHQ)2*&$PDQGD0F&DOHE
6XEMHFW7KHWD:HVW37'.LFN7ROHUDQFH
$WWDFKPHQWV0LQLPXP.LFN7ROHUDQFH[OV[
sŝĐƚŽƌŝĂʹ
ƚƚĂĐŚĞĚŝƐĂƐƉƌĞĂĚƐŚĞĞƚƚŽĂĚĚƌĞƐƐŬŝĐŬƚŽůĞƌĂŶĐĞŽŶƚŚĞdŚĞƚĂtĞƐƚηϭǁĞůů͘WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞƌĞĂƌĞƚǁŽƉĂŐĞĚ͘
KŶĞƉĂŐĞƌĞƉƌĞƐĞŶƚƐƚŚĞŵŝŶŝŵƵŵŬŝĐŬƚŽůĞƌĂŶĐĞĨŽƌƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐƐŚŽĞ>Kd͘ƐƐƵŵƉƚŝŽŶƐĂƌĞĐŽŶƐĞƌǀĂƚŝǀĞ͕
ĞƐƉĞĐŝĂůůLJƚŚĞƐŚŽĞĚĞƉƚŚ͘/ƚŝƐĐŚŽƐĞŶĂƚϯ͕ϬϬϬ͛ƚŚĞƌĞ͘ƐƉƌĞǀŝŽƵƐůLJĚŝƐĐƵƐƐĞĚ͕ǁĞŝŶƚĞŶĚƚŽůŽŽŬĨŽƌĂŐŽŽĚůĂŶĚŝŶŐ
ƉŽŝŶƚďĞĨŽƌĞϯ͕ϱϬϬ͘>ĂŶĚŝŶŐĚĞĞƉĞƌƚŚĂŶϯ͕ϬϬϬǁŝůůŽŶůLJŝŶĐƌĞĂƐĞŬŝĐŬƚŽůĞƌĂŶĐĞ͘
ƐĐĂůĐƵůĂƚĞĚ͕ƚŚĞŵŝŶŝŵƵŵ>KdŶĞĞĚĞĚĨŽƌĂϮϬďďůŬŝĐŬƚŽůĞƌĂŶĐĞŝƐϭϮ͘ϳϴ͘/ƉƌŽƉŽƐĞƉƌŽĐĞĞĚŝŶŐǁŝƚŚƚŚĂƚŶƵŵďĞƌĂƐĂ
ŵŝŶŝŵƵŵ>Kd͘
tŝƚŚƌĞŐĂƌĚƐƚŽƚŚĞ<ƵƉĂƌƵŬ͕/ŚĂǀĞĂůƐŽŝŶĐůƵĚĞĚĂŬŝĐŬƚŽůĞƌĂŶĐĞĐĂůĐƵůĂƚŝŽŶĂƐƐƵŵŝŶŐϵ͘ϱƉƉŐĂŶĚƚŚĞƚĞƐƚĞĚϭϮ͘ϭƉƉŐ
ƉŽƌĞƉƌĞƐƐƵƌĞŽĨƚŚĞ<ƵƉĂƌƵŬ͘/ŶƚŚŝƐĐĂƐĞ͕ĂƐŚŽĞƐƚƌĞŶŐƚŚŽĨŽǀĞƌϭϳƉƉŐǁŽƵůĚďĞŶĞĞĚĞĚĨŽƌĂŶLJŬŝĐŬƚŽůĞƌĂŶĐĞĂƚĂůů͘/
ďĞůŝĞǀĞƚŚĂƚƚŚĞĐŽŶĐůƵƐŝŽŶŝƐƚŚĂƚƚŚĞ<ƵƉĂƌƵŬƐŚŽƵůĚŶŽƚďĞĐƵƚ͕ĂŶĚǁĞĚŽŶŽƚŝŶƚĞŶĚƚŽĐƵƚŝƚ͘
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞůƵŶĐĂŶ
'ƌĞĂƚĞĂƌWĂŶƚŚĞŽŶ
ϴϭϳ͘ϮϰϬ͘ϯϴϲϱ
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
^ƵƌĨĂĐĞĂƐŝŶŐ^ŚŽĞĞƉƚŚϯϬϬϬĨƚ,ŽůĞƐŝnjĞϴ͘ϱŝŶ,ŽůĞƐŝnjĞϴ͘ϱŝŶDƵĚtĞŝŐŚƚϵ͘ϱƉƉŐƌĞĂ Ϭ͘ϯϵϰ ĨƚϮ сWŝΎƌΎƌƌĞĂ Ϭ͘ϯϵϰ ĨƚϮ сWŝΎƌΎƌ>Kd;D^/WͿϱϭϭƉƐŝ<ŝĐŬ,ĞŝŐŚƚ ϲϴϳ Ĩƚ сϮϰ<ŝĐŬ,ĞŝŐŚƚ ϲϴϳ Ĩƚ сϮϰDĂdžŝŵƵŵ,W'ƌĂĚŝĞŶƚϭϬƉƉŐ,ŽůĞsŽůƵŵĞ Ϯϳϭ Ĩƚϯ сƌĞĂΎ,ĞŝŐŚƚ<ŝĐŬ/ŶƚĞŶƐŝƚLJϬ͘ϱ ƉƉŐ сDĂdžŝŵƵŵ,W'ƌĂĚŝĞŶƚͲDƵĚtĞŝŐŚƚ,ŽůĞsŽůƵŵĞ ϰϴ ďďů сsŽůƵŵĞͬϱ͘ϲϭ>KdŐƌĂĚŝĞŶƚ Ϭ͘ϭϳ ƉƐŝͬĨƚ с>KdƉƌĞƐƐƵƌĞͬĞƉƚŚ,ŽůĞsŽůƵŵĞ Ϯϳϭ Ĩƚϯ сƌĞĂΎ,ĞŝŐŚƚ>KdŐƌĂĚŝĞŶƚ ϯ͘Ϯϴ ƉƉŐ с>KdŐƌĂĚŝĞŶƚͬ͘ϬϱϮ ,ŚĞŝŐŚƚϯϵϲ͘ϳϯĨƚ WƌŽǀŝĚĞĚďLJ^>,ŽůĞsŽůƵŵĞ ϰϴ ďďů сsŽůƵŵĞͬϱ͘ϲϭ>KdƌĞƐƵůƚ ϭϮ͘ϳϴ ůďͬŐĂů сDƵĚtĞŝŐŚƚн>KdŐƌĂĚŝĞŶƚ ,ŝƐƉůĂĐĞŵĞϭϬ͘Ϯϭ ďďů ĂůĐƵůĂƚĞĚĨƌŽŵ,ĚĂƚƋĂƐŚĞĞƚ^ŚŽĞĨƌĂĐƉƌĞƐƐƵƌĞ ϭϵϵϯ ƉƐŝ с>KdƌĞƐƵůƚΎϬ͘ϬϱϮΎ^ƵƌĨĂĐĞĂƐŝŶŐ^ŚŽǁĞƉƚŚƌŝůů^ƚƌŝŶŐ^ŝnjĞϰŝŶ<ŝĐŬdŽůĞƌĂŶĐĞƌŝůů^ƚƌŝŶŐ^ŝnjĞ ϰ ŝŶƌĞĂ Ϭ͘Ϭϴϳ ĨƚϮ сWŝΎƌΎƌdsϵϮϱϬĨƚƌĞĂ Ϭ͘Ϭϴϳ ĨƚϮ сWŝΎƌΎƌ<ŝĐŬ,ĞŝŐŚƚ ϲϴϳ Ĩƚ сϮϰhŶĚĞƌďĂůĂŶĐĞĚƵĞƚŽŬŝĐŬŝŶƚĞŶƐŝƚLJϮϰϬ͘ϱ ƉƐŝƌŝůůƐƚƌŝŶŐŚĞŝŐŚƚŝŶŬŝĐŬ ϮϵϬ Ĩƚ с<ŝĐŬ,ĞŝŐŚƚͲ,,ĞŝŐŚƚͲ,tW,ĞŝŐŚƚDĂdžŚLJĚƌŽƐƚĂƚŝĐƉƌĞƐƐƵƌĞůŽƐƐ ϮϳϬ͘ϱ ƉƐŝ сD^/WͲhŶĚĞƌďĂůĂŶĐĞĚƵĞƚŽŬŝĐŬŝŶƚĞŶƐŝƚLJƌŝůů^ƚƌŝŶŐŝƐƉůĂĐĞŵĞŶƚsŽůƵŵĞ Ϯϱ Ĩƚϯ сƌĞĂΎ,ĞŝŐŚƚDƵĚ,LJĚƌŽƐƚĂƚŝĐŐƌĂĚŝĞŶƚ Ϭ͘ϰϵ ƉƐŝͬĨƚ сDƵĚtĞŝŐŚƚΎ͘ϬϱϮ ƌŝůů^ƚƌŝŶŐŝƐƉůĂĐĞŵĞŶƚsŽůƵŵĞ ϱ ďďů сsŽůƵŵĞͬϱ͘ϲϭ ƌŝůů^ƚƌŝŶŐŝƐƉůĂĐĞŵĞŶƚsŽůƵŵĞ ϲϬ Ĩƚϯ сƌĞĂΎ,ĞŝŐŚƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ ϰϴϭϬ ƉƐŝ сdsΎDĂdžŝŵƵŵ,W'ƌĂĚŝĞŶƚΎ͘ϬϱϮƌŝůů^ƚƌŝŶŐŝƐƉůĂĐĞŵĞŶƚsŽůƵŵĞ ϭϭ ďďů сsŽůƵŵĞͬϱ͘ϲϭDĂdžŝŵƵŵŚĞŝŐŚƚŽĨŐĂƐŬŝĐŬϲϴϳ ĨƚůůŽǁĂďůĞ<ŝĐŬsŽůƵŵĞsŽůƵŵĞĂƚ,Wϯϯ͘ϱďďůс<ŝĐŬsŽůƵŵĞΎƐŚŽĞĨƌĂĐƉƌĞƐƐƵƌĞͬ,WůůŽǁĂďůĞ<ŝĐŬsŽůƵŵĞϮϭϬ͘ϲĨƚϯс,ŽůĞsůŽƵŵĞͲŝƐƉůĂĐĞĚǀŽůƵŵĞůůŽǁĂďůĞ<ŝĐŬsŽůƵŵĞϰϴ͘Ϯďďůс,ŽůĞsůŽƵŵĞͲŝƐƉůĂĐĞĚǀŽůƵŵĞůůŽǁĂďůĞ<ŝĐŬsŽůƵŵĞĂƚ,WϮϬ͘Ϭďďůс<ŝĐŬsŽůƵŵĞΎƐŚŽĞĨƌĂĐƉƌĞƐƐƵƌĞͬ,WDŝŶŝŵƵŵŬŝĐŬƚŽůĞƌĂŶĐĞĐĂůĐƵůĂƚŝŽŶƐ͕dŚĞƚĂtĞƐƚηϭĂƐƉƌŽŐŶŽƐĞĚŚƚƚƉ͗ͬͬǁǁǁ͘ĚƌŝůůŝŶŐĨŽƌŵƵůĂƐ͘ĐŽŵͬŬŝĐŬͲƚŽůĞƌĂŶĐĞͲĐŽŶĐĞƉƚͲĂŶĚͲĐĂůĐƵůĂƚŝŽŶͲĨŽƌͲǁĞůůͲĚĞƐŝŐŶͬWƌĞƐƐƵƌĞĂůĐƵůĂƚŝŽŶƐsŽůƵŵĞĂůĐƵůĂƚŝŽŶƐĂƐĞϭ͕ǀŽůƵŵĞĂƚŽƚƚŽŵ,ŽůĞƐƐĞŵďůLJsŽůƵŵĞĂůĐƵůĂƚŝŽŶƐĂƐĞϮ͕ǀŽůƵŵĞĂƚƐŚŽĞĂĚũƵƐƚĞĚƚŽďŽƚƚŽŵŚŽůĞĐŽŶĚŝƚŝŽŶƐсDĂdž,LJĚƌŽƐƚĂƚŝĐWƌĞƐƐƵƌĞůŽƐƐͬ;DƵĚ,LJĚƌŽƐƚĂƚŝĐŐƌĂĚŝĞŶƚͲϬ͘ϭͿΎdŚŝƐƐƉƌĞĂĚƐŚĞĞƚĨŽůůŽǁƐƚŚĞŵĞƚŚŽĚƐĂƐůŝƐƚĞĚŽŶƚŚĞĨŽůůŽǁŝŶŐǁĞďƐŝƚĞ
^ƵƌĨĂĐĞĂƐŝŶŐ^ŚŽĞĞƉƚŚϯϬϬϬĨƚ,ŽůĞƐŝnjĞϴ͘ϱŝŶ,ŽůĞƐŝnjĞϴ͘ϱŝŶDƵĚtĞŝŐŚƚϵ͘ϱƉƉŐƌĞĂ Ϭ͘ϯϵϰĨƚϮ сWŝΎƌΎƌƌĞĂ Ϭ͘ϯϵϰĨƚϮ сWŝΎƌΎƌ>Kd;D^/WͿϭϮϴϬƉƐŝ<ŝĐŬ,ĞŝŐŚƚ ϳϱ Ĩƚ сϮϰ<ŝĐŬ,ĞŝŐŚƚ ϳϱ Ĩƚ сϮϰDĂdžŝŵƵŵ,W'ƌĂĚŝĞŶƚϭϮ͘ϭƉƉŐ,ŽůĞsŽůƵŵĞ Ϯϵ Ĩƚϯ сƌĞĂΎ,ĞŝŐŚƚ<ŝĐŬ/ŶƚĞŶƐŝƚLJ Ϯ͘ϲ ƉƉŐ сDĂdžŝŵƵŵ,W'ƌĂĚŝĞŶƚͲDƵĚtĞŝŐŚƚ ,ŽůĞsŽůƵŵĞ ϱ ďďů сsŽůƵŵĞͬϱ͘ϲϭ>KdŐƌĂĚŝĞŶƚ Ϭ͘ϰϯ ƉƐŝͬĨƚ с>KdƉƌĞƐƐƵƌĞͬĞƉƚŚ,ŽůĞsŽůƵŵĞ Ϯϵ Ĩƚϯ сƌĞĂΎ,ĞŝŐŚƚ>KdŐƌĂĚŝĞŶƚ ϴ͘Ϯϭ ƉƉŐ с>KdŐƌĂĚŝĞŶƚͬ͘ϬϱϮ ,ŚĞŝŐŚƚϯϵϲ͘ϳϯĨƚ WƌŽǀŝĚĞĚďLJ^> ,ŽůĞsŽůƵŵĞ ϱ ďďů сsŽůƵŵĞͬϱ͘ϲϭ>KdƌĞƐƵůƚ ϭϳ͘ϳϭ ůďͬŐĂů сDƵĚtĞŝŐŚƚн>KdŐƌĂĚŝĞŶƚ ,ŝƐƉůĂĐĞŵĞϭϬ͘Ϯϭ ďďů ĂůĐƵůĂƚĞĚĨƌŽŵ,ĚĂƚƋĂƐŚĞĞƚ^ŚŽĞĨƌĂĐƉƌĞƐƐƵƌĞ ϮϳϲϮ ƉƐŝ с>KdƌĞƐƵůƚΎϬ͘ϬϱϮΎ^ƵƌĨĂĐĞĂƐŝŶŐ^ŚŽǁĞƉƚŚƌŝůů^ƚƌŝŶŐ^ŝnjĞϰŝŶ<ŝĐŬdŽůĞƌĂŶĐĞƌŝůů^ƚƌŝŶŐ^ŝnjĞ ϰ ŝŶƌĞĂ Ϭ͘Ϭϴϳ ĨƚϮ сWŝΎƌΎƌdsϵϮϱϬĨƚƌĞĂ Ϭ͘Ϭϴϳ ĨƚϮ сWŝΎƌΎƌ<ŝĐŬ,ĞŝŐŚƚ ϳϱ Ĩƚ сϮϰhŶĚĞƌďĂůĂŶĐĞĚƵĞƚŽŬŝĐŬŝŶƚĞŶƐŝƚLJ ϭϮϱϬ͘ϲ ƉƐŝƌŝůůƐƚƌŝŶŐŚĞŝŐŚƚŝŶŬŝĐŬ ͲϯϮϮ Ĩƚ с<ŝĐŬ,ĞŝŐŚƚͲ,,ĞŝŐŚƚͲ,tW,ĞŝŐŚƚDĂdžŚLJĚƌŽƐƚĂƚŝĐƉƌĞƐƐƵƌĞůŽƐƐ Ϯϵ͘ϰ ƉƐŝ сD^/WͲhŶĚĞƌďĂůĂŶĐĞĚƵĞƚŽŬŝĐŬŝŶƚĞŶƐŝƚLJ ƌŝůů^ƚƌŝŶŐŝƐƉůĂĐĞŵĞŶƚsŽůƵŵĞ ͲϮϴ Ĩƚϯ сƌĞĂΎ,ĞŝŐŚƚDƵĚ,LJĚƌŽƐƚĂƚŝĐŐƌĂĚŝĞŶƚ Ϭ͘ϰϵ ƉƐŝͬĨƚ сDƵĚtĞŝŐŚƚΎ͘ϬϱϮ ƌŝůů^ƚƌŝŶŐŝƐƉůĂĐĞŵĞŶƚsŽůƵŵĞ Ͳϱ ďďů сsŽůƵŵĞͬϱ͘ϲϭ ƌŝůů^ƚƌŝŶŐŝƐƉůĂĐĞŵĞŶƚsŽůƵŵĞ ϳ Ĩƚϯ сƌĞĂΎ,ĞŝŐŚƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ ϱϴϮϬ ƉƐŝ сdsΎDĂdžŝŵƵŵ,W'ƌĂĚŝĞŶƚΎ͘ϬϱϮƌŝůů^ƚƌŝŶŐŝƐƉůĂĐĞŵĞŶƚsŽůƵŵĞ ϭ ďďů сsŽůƵŵĞͬϱ͘ϲϭDĂdžŝŵƵŵŚĞŝŐŚƚŽĨŐĂƐŬŝĐŬ ϳϱ ĨƚůůŽǁĂďůĞ<ŝĐŬsŽůƵŵĞsŽůƵŵĞĂƚ,WϬ͘Ϭďďůс<ŝĐŬsŽůƵŵĞΎƐŚŽĞĨƌĂĐƉƌĞƐƐƵƌĞͬ,WůůŽǁĂďůĞ<ŝĐŬsŽůƵŵĞϮϮ͘ϵĨƚϯс,ŽůĞsůŽƵŵĞͲŝƐƉůĂĐĞĚǀŽůƵŵĞůůŽǁĂďůĞ<ŝĐŬsŽůƵŵĞϱ͘Ϯďďůс,ŽůĞsůŽƵŵĞͲŝƐƉůĂĐĞĚǀŽůƵŵĞůůŽǁĂďůĞ<ŝĐŬsŽůƵŵĞĂƚ,WϮ͘ϱďďůс<ŝĐŬsŽůƵŵĞΎƐŚŽĞĨƌĂĐƉƌĞƐƐƵƌĞͬ,WŚƚƚƉ͗ͬͬǁǁǁ͘ĚƌŝůůŝŶŐĨŽƌŵƵůĂƐ͘ĐŽŵͬŬŝĐŬͲƚŽůĞƌĂŶĐĞͲĐŽŶĐĞƉƚͲĂŶĚͲĐĂůĐƵůĂƚŝŽŶͲĨŽƌͲǁĞůůͲĚĞƐŝŐŶͬDŝŶŝŵƵŵŬŝĐŬƚŽůĞƌĂŶĐĞĐĂůĐƵůĂƚŝŽŶƐ͕dŚĞƚĂtĞƐƚηϭŝĨ<ƵƉĂƌƵŬŝƐĐƵƚWƌĞƐƐƵƌĞĂůĐƵůĂƚŝŽŶƐsŽůƵŵĞĂůĐƵůĂƚŝŽŶƐĂƐĞϭ͕ǀŽůƵŵĞĂƚŽƚƚŽŵ,ŽůĞƐƐĞŵďůLJsŽůƵŵĞĂůĐƵůĂƚŝŽŶƐĂƐĞϮ͕ǀŽůƵŵĞĂƚƐŚŽĞĂĚũƵƐƚĞĚƚŽďŽƚƚŽŵŚŽůĞĐŽŶĚŝƚŝŽŶƐсDĂdž,LJĚƌŽƐƚĂƚŝĐWƌĞƐƐƵƌĞůŽƐƐͬ;DƵĚ,LJĚƌŽƐƚĂƚŝĐŐƌĂĚŝĞŶƚͲϬ͘ϭͿΎdŚŝƐƐƉƌĞĂĚƐŚĞĞƚĨŽůůŽǁƐƚŚĞŵĞƚŚŽĚƐĂƐůŝƐƚĞĚŽŶƚŚĞĨŽůůŽǁŝŶŐǁĞďƐŝƚĞ
'DYLHV6WHSKHQ)2*&
)URP0LFKDHO'XQFDQPLFKDHO#JUHDWEHDUSHWURFRP!
6HQW:HGQHVGD\-DQXDU\$0
7R'DYLHV6WHSKHQ)2*&
&F/RHSS9LFWRULD72*&%R\HU'DYLG/2*&$PDQGD0F&DOHE
6XEMHFW5H7KHWD:HVW37'$GGLWLRQDO4XHVWLRQV
Dƌ͘ĂǀŝĞƐʹ
ďŽǀĞĂůů͕ƚŚĞĂŶƐǁĞƌŝƐƚŚĂƚǁĞĚŽŶŽƚƉůĂŶƚŽĐƵƚƚŚƌŽƵŐŚƚŚĞ,ZŽƌƉĞŶĞƚƌĂƚĞƚŚĞ<ƵƉĂƌƵŬ͘tĞŽŶůLJƐĞĞŬĞŶŽƵŐŚ
ƌŽŽŵƚŽƉůĂĐĞƚŚĞƐŚŽĞŝŶƚŚĞƚŽƉŽĨƚŚĞƐŚĂůĞ͕ǁŚŝĐŚƐŚŽƵůĚƌŽƵŐŚůLJĐŽŝŶĐŝĚĞǁŝƚŚƚŚĞŵŽŵĞŶƚǁĞĐĂŶƐĞĞƚŚĞ,ZŽŶ
ƚŚĞ>tƚŽŽůƐ͘
/ǀĞƌLJŵƵĐŚĂƉƉƌĞĐŝĂƚĞLJŽƵƌǀŝĞǁĂŶĚĐŽŶĐĞƌŶƐŽŶƚŚŝƐ͕ĂƐ/ƐŚĂƌĞƚŚĞǀŝĞǁŽĨƉŽƚĞŶƚŝĂůƉƌĞƐƐƵƌĞŝŶƚŚĞ<ƵƉĂƌƵŬ͘dŚĞƌĞŝƐ
ŶŽŝŶƚĞŶƚƚŽƉĞŶĞƚƌĂƚĞƚŚĞ<ƵƉĂƌƵŬ͘dŚĞϵ͕ϱϬϬ͛ĚĞƉƚŚŝŶƚŚĞWǁĂƐĐŚŽƐĞŶĨŽƌƉůĂŶŶŝŶŐĂŶĚĞŶŐŝŶĞĞƌŝŶŐƉƵƌƉŽƐĞƐ͘tĞ
ŵĂĚĞƚŚĞǁĞůůĚĞƐŝŐŶ͕ŝŶĐůƵĚŝŶŐD^W͕ĐĂƐŝŶŐĚĞƐŝŐŶ͕ĂŶĚŵŽƌĞ͕ŝŶƚŚĞ͞ǁŽƌƐƚĐĂƐĞ͟ƐĐĞŶĂƌŝŽŽĨĨŽƌŵĂƚŝŽŶƐĐŽŵŝŶŐŝŶ
ĚĞĞƉĞƌƚŚĂŶƉƌŽŐŶŽƐĞĚ͘KƵƌŝŶƚĞŶƚŝƐƚŽƐƚŽƉŽŶĐĞǁĞƐĞĞƚŚĞ,Z͘
ƐǁĞĚƌŝůůƚŚĞƌŽŽŬŝĂŶĨŽƌŵĂƚŝŽŶ͕ƚŚĞƌĞǁŝůůďĞƐŝŐŶŝĨŝĐĂŶƚĞĨĨŽƌƚƚŽĐŽƌƌĞůĂƚĞǁĞůůĚĞƉƚŚƐƚŽŽĨĨƐĞƚƐ͘KƵƌŽŶͲƐŝƚĞŐĞŽůŽŐLJ
ƚĞĂŵŝƐǁĞůůǀĞƌƐĞĚŝŶƚŚĞĂƌĞĂĂŶĚǁĞůůƐ͘ůKĐŚƐǁŝƚŚWZŝƐŽƵƌŵĂŝŶǁĞůůƐŝƚĞŐĞŽůŽŐŝƐƚĂŶĚǁĂƐŽŶƐŝƚĞǁŚĞŶƚŚĞ
ĐŽƌƌĞůĂƚŝǀĞŝŶƚĞƌǀĂůƐŽĨƚŚĞdĂůŝƚŚĂǁĞƌĞĐƵƚ͘/ŶĂĚĚŝƚŝŽŶƚŽŚŝƐĞĨĨŽƌƚƐ͕ǁĞǁŝůůďĞĐŽƌƌĞůĂƚŝŶŐƌĞŵŽƚĞůLJƚŽĞŶƐƵƌĞƚŚĂƚůŽŐƐ͕
ƐĞŝƐŵŝĐ͕ŽĨĨƐĞƚƐ͕ĂŶĚĂůůĨƵƌƚŚĞƌŝŶĨŽƌŵĂƚŝŽŶĂǀĂŝůĂďůĞŝƐĐŽƌƌĞůĂƚĞĚĂŶĚĐƌŽƐƐƌĞĨĞƌĞŶĐĞĚƚŽŵĂŬĞƐƵƌĞǁĞŬŶŽǁǁŚĞƌĞǁĞ
ĂƌĞ͘/ŶĂĚĚŝƚŝŽŶ͕ƚŚĞŚŝŐŚŐĂŵŵĂƐŝŐŶĂƚƵƌĞŽĨƚŚĞ,ZƐŚŽƵůĚďĞǀĞƌLJĞĂƐŝůLJƌĞĐŽŐŶŝnjĞĚ͘KŶƐŝƚĞ͕ǁĞƐŚŽƵůĚŬŶŽǁǁŚĞŶ
ǁĞŐĞƚĐůŽƐĞƚŽƚŚĞ,Z͘KŶĐĞŝƚƐŚŽǁƐƵƉŽŶƚŚĞůŽŐƐǁĞǁŝůůdƚŚĞǁĞůů͘
dŚĞƌŽŽŬŝĂŶŝŶƚĞƌǀĂůŚĂƐďĞĞŶŶĞĂƌŶŽƌŵĂůƉƌĞƐƐƵƌĞŝŶƚŚĞǁĞůůƐƚŚĂƚǁĞŚĂǀĞĚƌŝůůĞĚ͘tĞŚĂǀĞŶŽŝŶĚŝĐĂƚŝŽŶƚŚĂƚƚŚĞ
dŚĞƚĂtĞƐƚηϭǁŝůůďĞĚŝĨĨĞƌĞŶƚ͘ŝĨĨŝĐƵůƚŝĞƐŝŶƚŚĞƉĂƐƚǁĞůůƐ͕ŝŶƚŚĞƌŽŽŬŝĂŶŝŶƚĞƌǀĂů͕ŚĂǀĞŝŶǀŽůǀĞĚůŽƐƚĐŝƌĐƵůĂƚŝŽŶ͘tĞ
ƐĞĞŬƚŽŵŝƚŝŐĂƚĞƚŚŝƐǁŝƚŚůŽǁĞƌŵƵĚǁĞŝŐŚƚƐ͘dŚĞŝŶƚĞŶƚŝƐƚŽďĞŽǀĞƌďĂůĂŶĐĞĚ͕ďƵƚŶŽƚƐŽŵƵĐŚĂƐƚŽĐƌĞĂƚĞĐŝƌĐƵůĂƚŝŽŶ
ĚŝĨĨŝĐƵůƚŝĞƐ͘
ƐĂůǁĂLJƐ͕ƐƚĂŶĚĂƌĚĚƌŝůůŝŶŐƉƌĂĐƚŝĐĞƐǁŝůůďĞƵƐĞĚĨŽƌŵŽŶŝƚŽƌŝŶŐĂŶĚŚĂŶĚůŝŶŐƵŶĞdžƉĞĐƚĞĚƉƌĞƐƐƵƌĞ͘WŝƚŵŽŶŝƚŽƌŝŶŐŝƐĂ
ĨŝƌƐƚŝŶĚŝĐĂƚŽƌĂŶĚƉŝƚĂůĂƌŵƐǁŝůůďĞŝŶƉůĂĐĞĂŶĚƚĞƐƚĞĚ͘DƵĚĐŽŵƉŽŶĞŶƚƐǁŝůůďĞĂǀĂŝůĂďůĞĨŽƌŝŶĐƌĞĂƐŝŶŐŵƵĚǁĞŝŐŚƚďLJ
ϭ͘ϬƉƉŐ͘^ƵĨĨŝĐŝĞŶƚƉƌŽĚƵĐƚŝƐĂǀĂŝůĂďůĞĨŽƌŵƵĐŚŵŽƌĞǁĞŝŐŚƚĂƐŶĞĞĚĞĚ͘
tŚĞŶƉůĂŶŶŝŶŐƚŚŝƐǁĞůů͕/ƵƐĞĚƚŚĞϵ͕ϱϬϬ͛ĚĞƉƚŚĞĂƌůLJĂŶĚŬĞƉƚŝƚďĞĐĂƵƐĞŝƚŬĞƉƚƚŚĞĚĞƐŝŐŶĐŽŶĐĞƉƚƐĐŽŶƐĞƌǀĂƚŝǀĞ͘zŽƵƌ
ĐŽŶĐĞƌŶƐŽĨĞŶĐŽƵŶƚĞƌŝŶŐƚŚĞ<ƵƉĂƌƵŬĂƚƚŚĂƚĚĞƉƚŚĂƌĞǀĞƌLJǀĂůŝĚĂŶĚ/ĂŐĂŝŶǁŽƵůĚůŝŬĞƚŽƌĞŝƚĞƌĂƚĞƚŚĂƚǁĞŚĂǀĞŶŽ
ŝŶƚĞŶƚŝŽŶŽĨĐƵƚƚŝŶŐƚŚƌŽƵŐŚƚŚĞ,ZŽƌƉĞŶĞƚƌĂƚŝŶŐƚŚĞ<ƵƉĂƌƵŬ͘/ĂŵŐůĂĚƚŽĂŵĞŶĚŽƵƌdƚŽĂƐŚĂůůŽǁĞƌĚĞƉƚŚƚŽ
ƌĞĨůĞĐƚƚŚĂƚŝĨƐƵĐŚĂŵĞĂƐƵƌĞǁŽƵůĚŚĞůƉŵŝƚŝŐĂƚĞĐŽŶĨƵƐŝŽŶ͘
&ƵƌƚŚĞƌŝŶĨŽƌŵĂƚŝŽŶĂŶĚƌĞƐƉŽŶƐĞƚŽLJŽƵƌƋƵĞƐƚŝŽŶƐŝŶŝŶĐůƵĚĞĚďĞůŽǁŝŶƌĞĚ͘
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞů
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
&ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕:ĂŶƵĂƌLJϱ͕ϮϬϮϮϵ͗ϭϭD
dŽ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
Đ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗dŚĞƚĂtĞƐƚϭ;WdϮϮϭͲϭϬϲͿͲĚĚŝƚŝŽŶĂůYƵĞƐƚŝŽŶƐ
DŝĐŚĂĞů͕
/ΖŵĨŝŶŝƐŚŝŶŐŵLJƉŽƌƚŝŽŶŽĨƚŚĞƌĞǀŝĞǁŽĨƚŚĞWĞƌŵŝƚƚŽƌŝůůĂƉƉůŝĐĂƚŝŽŶĨŽƌdŚĞƚĂtĞƐƚϭ͘/ŚĂǀĞĂĨĞǁŵŽƌĞƋƵĞƐƚŝŽŶƐ
ĂŶĚĐŽŶĐĞƌŶƐƌĞŐĂƌĚŝŶŐƉŽƌĞƉƌĞƐƐƵƌĞĂŶĚ'ƌĞĂƚĞĂƌΖƐƉůĂŶŶĞĚŵƵĚƉƌŽŐƌĂŵ͘
dŚĞ'ĞŽůŽŐŝĐWƌŽŐŶŽƐŝƐĨŽƌĞĐĂƐƚƐƚŚĞ'Z,ZǁŝůůďĞĞŶĐŽƵŶƚĞƌĞĚĂƚϴϱϴϬΖDŝŶdŚĞƚĂtĞƐƚϭ͘'ŝǀĞŶƚŚĂƚƚŚĞWĞƌŵŝƚ
ƚŽƌŝůůĂƉƉůŝĐĂƚŝŽŶƐƚĂƚĞƐƚŚĂƚƚŚĞƉůĂŶŶĞĚƚŽƚĂůĚĞƉƚŚĨŽƌƚŚĞǁĞůůŝƐϵϱϬϬΖD;ƌŽƵŐŚůLJϵϮϬΖďĞůŽǁƚŚĞƚŽƉ,ZͿ͕ĂŶĚ
ƚŚĂƚƚŚĞƚŽƉŽĨƚŚĞ<ƵƉĂƌƵŬŝŶƚŚŝƐĂƌĞĂƚĞŶĚƐƚŽďĞĂďŽƵƚϮϰϬΖďĞůŽǁƚŚĞƚŽƉŽĨƚŚĞ'Zͬ,Z͕dŚĞƚĂtĞƐƚϭǁŝůůůŝŬĞůLJ
ĚƌŝůůŝŶƚŽĂŶĚƚŚƌŽƵŐŚƚŚĞ<ƵƉĂƌƵŬ͘/ŶLJŽƵƌŵĂŝůƚŽŵĞĚĂƚĞĚϭϮͬϭϰͬϮϭ͕LJŽƵŶŽƚĞƚŚĂƚ'ƌĞĂƚĞĂƌŚĂƐƐĞĞŶĂŵƉůĞ
ĞǀŝĚĞŶĐĞƚŚĂƚƚŚĞ,ZŝƐĂƉƌĞƐƐƵƌĞƚƌĂŶƐŝƚŝŽŶnjŽŶĞ͕ĂŶĚƚŚĂƚƚŚĞƵŶĚĞƌůLJŝŶŐ<ƵƉĂƌƵŬŚĂƐŵƵĐŚŚŝŐŚĞƌƉŽƌĞƉƌĞƐƐƵƌĞŝŶ
ƚŚĞdĂůŝƚŚĂǁĞůů͘&ŽƌŽƚŚĞƌǁĞůůƐŝŶƚŚŝƐŐĞŶĞƌĂůĂƌĞĂ͕K'͛ƐƌĞĐŽƌĚƐƐŚŽǁ͗
x^ĞƋƵŽŝĂϭĨůŽǁĞĚŝŶƚŚĞ<ƵƉĂƌƵŬͬ>hͬDŝůƵǀĞĂĐŚƐĞĐƚŝŽŶĂŶĚϭϬ͘ϰƉƉŐŵƵĚǁĂƐŶĞĞĚĞĚƚŽƌĞŐĂŝŶĐŽŶƚƌŽů͖
xtŚŝůĞĚƌŝůůŝŶŐĂďŽǀĞƚŚĞ,ƵĞ^ŚĂůĞŝŶWŝƉĞůŝŶĞ^ƚĂƚĞϭ͕ŵƵĚǁĞŝŐŚƚǁĂƐĐƵƚĨƌŽŵϭϬ͘ϭƉƉŐƚŽϴ͘ϬƉƉŐƚŚĂƚ
ƌĞƋƵŝƌĞĚϭϬ͘ϰƉƉŐƚŽƌĞŐĂŝŶƐƚĂďŝůŝƚLJ͕ĂŶĚůŽƐƚĐŝƌĐƵůĂƚŝŽŶǁĂƐƌĞƉŽƌƚĞĚŝŶƚŚĞ'ZͬWĞďďůĞ^ŚĂůĞŝŶƚĞƌǀĂůǁŚŝůĞ
ĚƌŝůůŝŶŐǁŝƚŚϭϬ͘ϱƉƉŐŵƵĚ͖ĂŶĚ
xĂŝůLJŽƉĞƌĂƚŝŽŶƐƐƵŵŵĂƌŝĞƐĂŶĚƚŚĞŵƵĚůŽŐĨƌŽŵdĂůŝƚŚĂWŝůŽƚ,ŽůĞƌĞĐŽƌĚĞůĞǀĂƚĞĚŐĂƐƌĞĂĚŝŶŐƐƚŚĂƚƌĞĂĐŚĞĚ
ĂŵĂdžŝŵƵŵŽĨϮϴϱϬƵŶŝƚƐǁŚŝůĞĚƌŝůůŝŶŐƚŚĞ<ƵƉĂƌƵŬƵƐŝŶŐϵ͘ϱƉƉŐŵƵĚ͘
dŚĞŶƚŝĐŝƉĂƚĞĚWŽƌĞWƌĞƐƐƵƌĞĂŶĚ&ƌĂĐ'ƌĂĚŝĞŶƚĐŚĂƌƚĂĐĐŽŵƉĂŶLJŝŶŐ'ƌĞĂƚĞĂƌΖƐĂƉƉůŝĐĂƚŝŽŶƐŚŽǁƐĂŶĂŶƚŝĐŝƉĂƚĞĚƉŽƌĞ
ƉƌĞƐƐƵƌĞŐƌĂĚŝĞŶƚŽĨϴ͘ϴƉƉŐDtĨƌŽŵϯϱϬϬΖƚŽϵϱϬϬ͛͘dŚĞD/^tKƌŝůůŝŶŐ&ůƵŝĚƐWƌŽŐƌĂŵĂĐĐŽŵƉĂŶLJŝŶŐƚŚĞ
ĂƉƉůŝĐĂƚŝŽŶŝŶĚŝĐĂƚĞƐƚŚĞƉƌŽĚƵĐƚŝŽŶŝŶƚĞƌǀĂůǁŝůůďĞĚƌŝůůĞĚǁŝƚŚϵ͘ϬƚŽϵ͘ϱƉƉŐŵƵĚ͘/ŶLJŽƵƌĞŵĂŝůŽĨϭϮͬϭϰͬϮϭLJŽƵƐƚĂƚĞ
ƚŚĂƚ'ƌĞĂƚĞĂƌΖƐΗ͘͘͘ŝŶƚĞŶƚŝƐƚŽďĞŽǀĞƌďĂůĂŶĐĞĚ͕ďƵƚŶŽƚƐŝŐŶŝĨŝĐĂŶƚůLJ͘ΗĂƚĂĨƌŽŵƚŚĞĂďŽǀĞͲŵĞŶƚŝŽŶĞĚǁĞůůƐƐƵŐŐĞƐƚƐ
ƚŚĂƚϵ͘ϱƉƉŐŵƵĚǁŝůůůŝŬĞůLJƌĞƐƵůƚŝŶƐŝŐŶŝĨŝĐĂŶƚƵŶĚĞƌďĂůĂŶĐĞǁŚŝůĞĚƌŝůůŝŶŐĂƚƚŚŝƐƌĞŵŽƚĞůŽĐĂƚŝŽŶ͘
WůĞĂƐĞĚŝƐĐƵƐƐĨƵƌƚŚĞƌǁŚLJƚŚĞƉƌŽƉŽƐĞĚŵƵĚƉƌŽŐƌĂŵŝƐĂĚĞƋƵĂƚĞƚŽĞŶƐƵƌĞĂƐĂĨĞĂŶĚĞŶǀŝƌŽŶŵĞŶƚĂůůLJƐŽƵŶĚĚƌŝůůŝŶŐ
ŽƉĞƌĂƚŝŽŶĂŶĚƉƌŽǀŝĚĞĂŶƐǁĞƌƐƚŽĞĂĐŚŽĨƚŚĞĨŽůůŽǁŝŶŐƋƵĞƐƚŝŽŶƐ͘
xtŚĂƚŝƐƚŚĞďĂƐŝƐĨŽƌ'ƌĞĂƚĞĂƌ͛ƐĂŶƚŝĐŝƉĂƚĞĚƉŽƌĞƉƌĞƐƐƵƌĞŐƌĂĚŝĞŶƚŽĨϴ͘ϴƉƉŐDtĨƌŽŵϯϱϬϬΖDƚŽϵϱϬϬ͍͛
dŚĞďĂƐŝƐŝƐƚŚĂƚƚŚĞŝŶƚĞƌǀĂůĐƵƚŝƐŵĞĂŶƚƚŽƌĞƉƌĞƐĞŶƚƚŚĞƌŽŽŬŝĂŶĨŽƌŵĂƚŝŽŶŽŶůLJ͘ƐŵĞŶƚŝŽŶĞĚĂďŽǀĞ͕ƚŚĞ
ϵϱϬϬ͛dǁĂƐĂƉůĂĐĞŚŽůĚĞƌĨŽƌĞƋƵŝƉŵĞŶƚƉƵƌĐŚĂƐĞĂŶĚƐƵĐŚ͕ǁĞǁŝůůdĂƐƐŽŽŶĂƐǁĞĞŶƚĞƌƚŚĞ,Z͘
xŽĞƐ'ƌĞĂƚĞĂƌƉůĂŶƚŽĚƌŝůůŝŶƚŽƚŚĞ<ƵƉĂƌƵŬ&ŽƌŵĂƚŝŽŶ͍EŽ͕'ƌĞĂƚĞĂƌŝŶƚĞŶĚƐƚŽƐƚŽƉĂƐƐŽŽŶĂƐ,ZŝƐ
ǀŝƐŝďůĞŽŶ>tƚŽŽůƐ
x/ĨƐŽ͕ǁŚLJǁĂƐŶ͛ƚĞůĞǀĂƚĞĚƉŽƌĞƉƌĞƐƐƵƌĞŵĞŶƚŝŽŶĞĚŝŶƚŚĞ͞dŚĞƚĂtĞƐƚƌŝůůŝŶŐZŝƐŬƐ͟ƐĞĐƚŝŽŶŽĨƚŚĞĂƉƉůŝĐĂƚŝŽŶ͍
Eͬ
xtŚĂƚŵŽŶŝƚŽƌŝŶŐǁŝůůďĞƵƐĞĚƚŽŝĚĞŶƚŝĨLJĂŶLJĂďƌƵƉƚŝŶĐƌĞĂƐĞ;ƐͿŝŶƉŽƌĞƉƌĞƐƐƵƌĞǁŚŝůĞĚƌŝůůŝŶŐŝŶƚŽĂŶĚƚŚƌŽƵŐŚ
ƚŚĞ,ZƐŚĂůĞĂŶĚ<ƵƉĂƌƵŬ͍tĞĚŽŶŽƚƉůĂŶƚŽĚƌŝůůƚŚĂƚŝŶƚĞƌǀĂů͕ďƵƚƐƚĂŶĚĂƌĚĚƌŝůůŝŶŐŵŽŶŝƚŽƌŝŶŐŝŶĐůƵĚŝŶŐƉŝƚ
ůĞǀĞůŵŽŶŝƚŽƌŝŶŐĂŶĚĂůĂƌŵƐǁŝůůďĞŝŶƉůĂĐĞ
xtŝůůWƌĞƐƐƵƌĞͲtŚŝůĞͲƌŝůůŝŶŐƚĞĐŚŶŽůŽŐLJďĞƵƐĞĚ͍EŽ
xtŚĂƚŽƚŚĞƌŵĞĂƐƵƌĞƐǁŝůůďĞƵŶĚĞƌƚĂŬĞŶƚŽŵŽŶŝƚŽƌƉŽƌĞƉƌĞƐƐƵƌĞƌĞĂůƚŝŵĞ͍DƵĚǁŝůůďĞƚŚĞŵĞĚŝƵŵƵƐĞĚ͕
ŵĞƚŚŽĚƐǁŝůůŝŶĐůƵĚĞƉŝƚŵŽŶŝƚŽƌŝŶŐĂŶĚǁĞůůŵŽŶŝƚŽƌŝŶŐĚƵƌŝŶŐĐŽŶŶĞĐƚŝŽŶƐ͘
xtŝůůĂĚĚŝƚŝŽŶĂůŵƵĚƐƵƉƉůŝĞƐďĞƌĞĂĚŝůLJĂǀĂŝůĂďůĞŽŶƐŝƚĞƚŽǁĞŝŐŚƚƚŚĞŵƵĚƐLJƐƚĞŵƵƉƋƵŝĐŬůLJŝŶƚŚĞĞǀĞŶƚŽĨ
ŶĞĞĚ͍tĞŝŐŚƚƉƌŽĚƵĐƚ;ĂƌŝƚĞͿǁŝůůďĞŽŶůŽĐĂƚŝŽŶ͕ĞŶŽƵŐŚƚŽǁĞŝŐŚƚƵƉĂƚůĞĂƐƚϭƉƉŐ͘
xdŽǁŚĂƚŵĂdžŝŵƵŵŵƵĚǁĞŝŐŚƚ͍tĞǁŝůůŚĂǀĞƚŚĞĐĂƉĂĐŝƚLJƚŽƌĞĂĐŚǁŚĂƚĞǀĞƌŵƵĚǁĞŝŐŚƚŝƐŶĞĐĞƐƐĂƌLJ͘
ĂƐĞĚŽŶƌĞĐŽƌĚƐĨƌŽŵŽƚŚĞƌǁĞůůƐŝŶƚŚŝƐŐĞŶĞƌĂůĂƌĞĂ͕ƚŚĞƌĞƐĞĞŵƐƚŽďĞĂŶĂƌƌŽǁǁŝŶĚŽǁďĞƚǁĞĞŶŵĂŝŶƚĂŝŶŝŶŐ
ŽǀĞƌďĂůĂŶĐĞĂŶĚĂǀŽŝĚŝŶŐůŽƐƚĐŝƌĐƵůĂƚŝŽŶǁŚŝůĞĚƌŝůůŝŶŐƚŚĞŝŶƚĞƌǀĂůĨƌŽŵ,ƵĞ^ŚĂůĞƚŚƌŽƵŐŚ<ƵƉĂƌƵŬ͘
x,ŽǁǁŝůůƚŚŝƐďĞŵŽŶŝƚŽƌĞĚĂŶĚŵĂŶĂŐĞĚ͍Eͬ
xtŝůůƐƵĨĨŝĐŝĞŶƚƐƵƉƉůŝĞƐŽĨůŽƐƚͲĐŝƌĐƵůĂƚŝŽŶŵĂƚĞƌŝĂůƐďĞƌĞĂĚŝůLJĂǀĂŝůĂďůĞŽŶƐŝƚĞŝŶĐĂƐĞŽĨŶĞĞĚĨŽƌŵƵůƚŝƉůĞŽƌ
ůĂƌŐĞͲƐĐĂůĞĞǀĞŶƚƐ͍^ƵĐŚŵĂƚĞƌŝĂůƐǁŝůůŶŽƚďĞŽŶͲƐŝƚĞ͕ďƵƚǁŝůůďĞĂǀĂŝůĂďůĞŽŶƚŚĞ^ůŽƉĞŝĨŶĞĞĚĞĚ͘
dŚĂŶŬƐĂŶĚƐƚĂLJƐĂĨĞ͕
^ƚĞǀĞĂǀŝĞƐ
ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ
KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ
;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ
ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ
ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘
&ƌŽŵ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ĞŶƚ͗DŽŶĚĂLJ͕:ĂŶƵĂƌLJϯ͕ϮϬϮϮϭϬ͗ϭϵWD
dŽ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗DĂƌŬDŝŵƐфŵŵŝŵƐΛǀŐĞƐůůĐ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗dŚĞƚĂtĞƐƚηϭ
Dƌ͘ĂǀŝĞƐʹ
dŚĂŶŬLJŽƵĨŽƌƚŚĞƚĞŶƚĂƚŝǀĞŶƵŵďĞƌƐ͘tĞƐƚŝůůĂŶƚŝĐŝƉĂƚĞƐƉƵĚŽŶŽƌĂƌŽƵŶĚƚŚĞϭϮƚŚŽĨ:ĂŶƵĂƌLJ͘
DŝĐŚĂĞů
&ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗DŽŶĚĂLJ͕:ĂŶƵĂƌLJϯ͕ϮϬϮϮϱ͗ϭϴWD
dŽ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
Đ͗DĂƌŬDŝŵƐфŵŵŝŵƐΛǀŐĞƐůůĐ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗dŚĞƚĂtĞƐƚηϭ
DŝĐŚĂĞů͕
dŚĞƚĂtĞƐƚϭŚĂƐƚĞŶƚĂƚŝǀĞůLJďĞĞŶĂƐƐŝŐŶĞĚW/EƵŵďĞƌϱϬͲϮϮϯͲϮϬϬϯϲͲϬϬͲϬϬĂŶĚK'͛ƐWĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌŽĨ
ϮϮϭͲϭϬϲ͘dŚŽƐĞŶƵŵďĞƌƐǁŝůůďĞĐŽŵĞ͞ŽĨĨŝĐŝĂů͟ƵƉŽŶ'ƌĞĂƚĞĂƌ͛ƐĂƉƉůŝĐĂƚŝŽŶĐŽŵƉůĞƚŝŶŐK'͛ƐƌĞǀŝĞǁƉƌŽĐĞƐƐ͘
/ƐƚŚĞĂƉƉƌŽdžŝŵĂƚĞƐƉƵĚĚĂƚĞƐƚŝůů:ĂŶƵĂƌLJϭϮƚŚ͍
dŚĂŶŬƐĂŶĚƐƚĂLJƐĂĨĞ͕
^ƚĞǀĞĂǀŝĞƐ
ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ
KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ
;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ
ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ
ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘
&ƌŽŵ͗DŝĐŚĂĞůƵŶĐĂŶфŵŝĐŚĂĞůΛŐƌĞĂƚďĞĂƌƉĞƚƌŽ͘ĐŽŵх
^ĞŶƚ͗DŽŶĚĂLJ͕:ĂŶƵĂƌLJϯ͕ϮϬϮϮϰ͗ϯϰWD
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
dŽ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗DĂƌŬDŝŵƐфŵŵŝŵƐΛǀŐĞƐůůĐ͘ĐŽŵх
^ƵďũĞĐƚ͗dŚĞƚĂtĞƐƚηϭ
Dƌ͘ĂǀŝĞƐʹ
,ĂƐĂŶW/ŶƵŵďĞƌďĞĞŶĂƐƐŝŐŶĞĚƚŽƚŚĞdŚĞƚĂtĞƐƚǁĞůů͍
dŚĂŶŬLJŽƵ͕
DŝĐŚĂĞů
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ
DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH
5HYLVHG
75$160,77$//(77(5&+(&./,67
:(//1$0(BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
37'BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
BBB'HYHORSPHQWBBB6HUYLFHBBB([SORUDWRU\BBB6WUDWLJUDSKLF7HVWBBB1RQ&RQYHQWLRQDO
),(/'BBBBBBBBBBBBBBBBBBBBBBBBBBBB322/BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
&KHFN%R[IRU$SSURSULDWH/HWWHU3DUDJUDSKVWREH,QFOXGHGLQ7UDQVPLWWDO/HWWHU
&+(&. 237,216 7(;7)25$33529$//(77(5
08/7,
/$7(5$/
,IODVWWZRGLJLWV
LQ$3,QXPEHUDUH
EHWZHHQ
7KH SHUPLW LV IRU D QHZ ZHOOERUH VHJPHQW RI H[LVWLQJ ZHOO 3HUPLW
1R BBBBBBBBBBBBB $3, 1R BBBBBBBBBBBBBBBBBBBBBBB
3URGXFWLRQVKRXOGFRQWLQXHWREHUHSRUWHGDVDIXQFWLRQRIWKHRULJLQDO
$3,QXPEHUVWDWHGDERYH
3LORW+ROH
,Q DFFRUGDQFH ZLWK $$& I DOO UHFRUGV GDWD DQG ORJV
DFTXLUHG IRU WKH SLORW KROH PXVW EH FOHDUO\ GLIIHUHQWLDWHG LQ ERWK
ZHOO QDPH BBBBBBBBBBBBBBBBBBBBBBB3+ DQG $3, QXPEHU
BBBBBBBBBBBBBBBBBBBBBIURPUHFRUGVGDWDDQGORJVDFTXLUHGIRU
ZHOOQDPHRQSHUPLW
6SDFLQJ
([FHSWLRQ
7KHSHUPLWLVDSSURYHGVXEMHFWWRIXOOFRPSOLDQFHZLWK$$&
$SSURYDO WR SURGXFHLQMHFW LV FRQWLQJHQW XSRQ LVVXDQFH RI
D FRQVHUYDWLRQ RUGHU DSSURYLQJ D VSDFLQJ H[FHSWLRQ
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBDV2SHUDWRUDVVXPHVWKHOLDELOLW\
RIDQ\SURWHVWWRWKHVSDFLQJH[FHSWLRQWKDWPD\RFFXU
'U\'LWFK6DPSOH
$OOGU\GLWFKVDPSOHVHWVVXEPLWWHGWRWKH$2*&&PXVWEHLQQRJUHDWHU
WKDQ
VDPSOHLQWHUYDOVIURPEHORZWKHSHUPDIURVWRUIURPZKHUH
VDPSOHVDUHILUVWFDXJKWDQG
VDPSOHLQWHUYDOVWKURXJKWDUJHW]RQHV
1RQ
&RQYHQWLRQDO
:HOO
3OHDVHQRWHWKHIROORZLQJVSHFLDOFRQGLWLRQRIWKLVSHUPLW
3URGXFWLRQRUSURGXFWLRQWHVWLQJRIFRDOEHGPHWKDQHLVQRWDOORZHGIRU
ZHOOXQWLODIWHU
KDVGHVLJQHGDQGLPSOHPHQWHGDZDWHUZHOOWHVWLQJSURJUDPWRSURYLGH
EDVHOLQH GDWD RQ ZDWHU TXDOLW\ DQG TXDQWLW\
BBBBBBBBBBBBBBBBBBBBBBBB PXVW FRQWDFW WKH $2*&& WR REWDLQ
DGYDQFHDSSURYDORIVXFKZDWHUZHOOWHVWLQJSURJUDP
:HOO/RJJLQJ
5HTXLUHPHQWV
5HJXODWLRQ$$&DDXWKRUL]HVWKH$2*&&WRVSHFLI\W\SHV
RIZHOOORJVWREHUXQ,QDGGLWLRQWRWKHZHOOORJJLQJSURJUDPSURSRVHG
E\BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBLQWKHDWWDFKHGDSSOLFDWLRQ
WKHIROORZLQJZHOOORJVDUHDOVRUHTXLUHGIRUWKLVZHOO
3HU6WDWXWH$6G%DQG5HJXODWLRQ$$&
FRPSRVLWHFXUYHVIRUZHOOORJVUXQPXVWEHVXEPLWWHGWRWKH$2*&&
ZLWKLQGD\VDIWHUFRPSOHWLRQVXVSHQVLRQRUDEDQGRQPHQWRIWKLV
ZHOO
7KHWD:HVW
([SORUDWRU\([SORUDWRU\
$GGLWLRQDOFRQGLWLRQIRU$2*&&
VFRYHUOHWWHU
'ULOOLQJRSHUDWLRQVPXVWFHDVHEHIRUHSHQHWUDWLQJWKHSRWHQWLDOO\RYHU
SUHVVXUHG.XSDUXN)RUPDWLRQ
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
V&RPPLVVLRQHUVRQ'HF2SHUDWRUKDVDSSURSULDWHERQGLQIRUFH<HV3HUPLWFDQEHLVVXHGZLWKRXWFRQVHUYDWLRQRUGHU<HV3HUPLWFDQEHLVVXHGZLWKRXWDGPLQLVWUDWLYHDSSURYDO<HV&DQSHUPLWEHDSSURYHGEHIRUHGD\ZDLW1$:HOOORFDWHGZLWKLQDUHDDQGVWUDWDDXWKRUL]HGE\,QMHFWLRQ2UGHUSXW,2LQFRPPHQWV)RU1$$OOZHOOVZLWKLQPLOHDUHDRIUHYLHZLGHQWLILHG)RUVHUYLFHZHOORQO\1$3UHSURGXFHGLQMHFWRUGXUDWLRQRISUHSURGXFWLRQOHVVWKDQPRQWKV)RUVHUYLFHZHOORQO\1$1RQFRQYHQJDVFRQIRUPVWR$6M$M$'<HV&RQGXFWRUGULYHQ&RQGXFWRUVWULQJSURYLGHG<HV6XUIDFHFDVLQJVHWDW
0'6XUIDFHFDVLQJSURWHFWVDOONQRZQ86':V<HVH[FHVVLQSHUPDIURVWSRUWFROODUDW
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