HomeMy WebLinkAbout179-052David Douglas Hilcorp North Slope, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 08/27/2024
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL T20240827-1
Log Image Files for the well listed in the table below:
Well API #PTD #Log Date Log Company Log Type AOGCC Eset#
PBU R-06 50029203880000 179-052 10/02/1979 SCH CBL
SFTP Transfer - Data Folders:
Please include current contact information if different from above.
179-052
T39504
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2024.08.27 15:52:26 -08'00'
C. V~ C~atterton December 16,
Cha',~.~' n
D. BDF. 89
1986
Lonnie C. Smith
Commissioner
Bobby D. Foster
Petroleum Inspector
Mech Integrity Test
SAPC PBU Pads S, M, U,
R, N, T, Y, H, F, X
Prudhoe Oil Pool
_.W. ednesday, Nove.mber 19~ 1986: The tests began at 7:00 a.m. and
were concluded for the day at 4:30 p.m. with 10 wells being tested.
Thursday,. November 20, 1986: The tests began at 7:00 a.m. and were
concluded for the day at 7:00 p.m. with 14~wells being tested.
Friday, November 21, 1986: The tests began at 6:30 a.m. and were
concluded for the day at 4:30 p.m. with lO'wells being tested.
Saturday, November 22~ 1986: The tests began at 6:30 a.m. and were
concluded at 1:00 p.m.; and were resumed at 6:00 p.m. and concluded
for the day at 9:00 p.m.
As the attached mechanical integ~tyjiQtest~ ~ ~ports show
were tested, all of which met the~IAOGCC regulations.
In summary, I witnessed the mechanical integrity tests on Standard
Alaska Production Company's injections wells listed on the attached
test forms.
Attachments
6GANNED DEC 3. 9 2002
ALASKA OIL AND GAS CONSERVATION CObiqISSION
bMCHANICAL INTEGRITY TEST
pRETEST START 15 MIN 30 MIN '
*P *I TYPE OF PRlt CASING TBG REQ TBG TI~. TIME TIME
W~, *S .____ ANNULUS TVD SIZE/WT/GRADE SIZE TEST CSG TBG TBG TBG CGvtqENTS
*bi *N FLUID MD PRESS PRESS CSG CSG CSG
: PRESS PRESS PRESS
,,, i ! ,,,
~ ,
'
'~ *, i '
I - IRJECrI}~ DRI'r~.TNG MUD i 20 AAC 25.030(a)
N - NOT ~ OTHER 20 AAC 25.412(c)
'~-':-' ~ -. OILIER 20 AAC 25.252(d)
-":?'-~,.,':~: · % $.GANNED BEg 1 9 2002
;:t ' ' ~. '., -
"D.EWS.06 : . :-' :
.,
__0 .... I0N CL_~g__~,MC~
REPORT
State cf Alaska
0iL & GAS C~NSERVATION COX~ISSION
'4ei! :Iame
Review the well file, and-c~?,-men.: on plug~/~g, well head
sue=us, and !cca=icn clearance - urcvide loc. clear, code.
·
Code
STATE OF ALASKA
ALASK,~'--":_ AND GAS CONSERVATION COMMI,"'-"ON
WELL COMFL~TION OR RECOMPLETION REPORT ~,~ID LOG
Plugged back for CT sidetrack
1. )Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service Water Injection
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 79-52
3. Address 8. APl Number
P.O. Box196612, Anchorage, Alaska 99519-6612 50-029-20388
4. Location of well at surface 9. Unit or Lease Name
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM ~ Prudhoe Bay Unit
At top of productive interval!:~ 10. Well Number
N/A - water injection well R-06i
At total depth i ~,_ :. 11. Field and Pool
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM Prudhoe Bay Field/Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Se-Ti-al No. Pool
KBD: 55.09 AMSLI ADL 028279
12. Date Spudded10/11/79 113' Date T'D' Reached ! 14' Date Comp" Susp" °r Aband'll 5' Water depth' if °ffsh°re 116' NO' °f Completions10/15/98 N/A MSL Zero
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional SurveyI 20. Depth where SSSV set121. Thickness of Permafrost
10688 9537 FTI 10535 9396 FTI [] Yes [] No I 2017 MD ! 1900' (Approx.)
22. Type Electric or Other Logs Run
23. CASING~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO-I-rOM SIZE CEMENTING RECORD AMOUNT PULLED
20x30 Surface 144 36" 605 c.f.
13-3/8" 72# L-80 Surface 2661 17 1/2" 3863 c.f.
9-5/8" 47# L-80 Surface 9740 12-1/4" 1514 c.f.
7" 29# L-80 9227 10681 8-1/2" 336 c.f.
24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD
and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD)
None, Not on Production 7" L-SO 9085' to 9085' 9 5/8" TIW packer at 9134'
MD TVD 5 1/2" L-80 9227 '7" Otis WD packer at 10072'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9870-10072 95 c.f. Class G cmt
Date First Production JMethod of Operation (Flowing, gas lift, etc.) I
Not on Production
!
Date of Test Hours Tested PRODUCTION OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
I
FOR TEST ·
Flow Tubing Casing Pressure 0ALCULATED · OIL-BBL GAS-MCF WATER-BBL O~L GRAViTY-APl (CORR)
Press. ~_4-HOuR RATE
!28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
'1
Form 10-407 Rev. 07-01-80 SulEmit In Duplicate
29. Geologic Markers 30. _ ormation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
31. List of Attachments
Summary of Daily Reports,
32. I hereby ce~ that the foregoing is true and correct to the best of my knowledge
Signed ~,a~ ~.~ Title Coiled Tubing Drilling TA Date ~/~ /(~ ~
Prepared By Name/Number: Theresa Mills 564-5894
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases
in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply
for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on
this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
KB.-ELEV = 55.09'
WELLHEAD: McEvoy Conventional BF. ELEV = 21.31'
13 5/8" 5M
ACTUATOR: Otis
O SSSV LANDING 12017
13-3/8",72#/ft, , "~'- -- NIPPLE
L-80, BTRS FOC-- ~ ! L~ ( otis )( 5.96" ID)
I 7",26#/ft, L-80,
TUBING '
i TUBING ID: 6.275'
I
I CAPACITY: .0382 BBL/FT
HORIZONTAL SIDETRACK 'I. JEER:
CROSSOVER
I Baker Entry Guide Top at 9890 Ft. SLIDING SLEEVE
I Baker Enty Guide ID= 4.00'
I Otis XA 9098
! Shoe at 12,038 ft. r ; i (4.562,, MIN. ID)
I
L CAPACITY:
0.0087
BBL/FT
9-5/8" PACKER t 9134
~ ( TIW )(4.75"1D)
,
.~ 5 1/2" "X" NIPPLE 9187
' ~ (Parker) (4.63" ID)
=.,~!~ 5 1/2" "XN" NIPPLE
· , 5 lr2;'NSoeal Assem bly 19221
. Seal)
Top 7" Liner Hanger I I ,
I
9 5/8"47# L-80 BTRS ! 740'
shoe I
"
~i OriginaJ 7', 29~, L-80, BTRS liner was
PERFORATION SUMMARY abandonded with cement plug from
9870-10072 ft. cement Plug was
REF: LOG: None
~IZE SPF INTERVAL (~PEN/SQZ'D I'~ pressure tested with 2200 psi.
I Original 7" Shoe at 10681 ft.
No Perfs, I
,' [ Open hole RABakerTagT' atWhipst°ck9870 ft. Top set at 9862
-4.56' window milled from 9862~9870 ft
I
I
' CTD HORIZONTAL SIDETRACK
TD of 4 1/2' Open Hole I 12308'
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
3/25/80 INITIAL RIG COMPLETION WELL: R-06ai (32-32-12-13)
11/15/89 HF RWO APl NO: 50-029-20388-01
1/7/99 cJs CTD Horizontal Sidetrack ,SEC 32i TN 12Ni RGE 13E
BP Exploration (Alaska)
i
31ZE 3PF INTERVAL ¢ ~PEN/SQZ'D
No Perfs,
Open hole
R-06
Cement plug/Set whipstock
10/14/98
OPERATIONS SUMMARY: MIRU SWS. PJSM. Calibrate POS tool. RIH with POS, GR/CCL, Safe System Fidng Head,
Baker Whipstock with RA PIP tag; stdng length = 40', CCL to top whipstock = 12.7'. Tie-in using CBL 10/2/79. Pull up to
9847', top whipstock at 9860'. POS orientation 27 deg left of HS. Reciprocate tool several times Jn attempt to reduce angle of
tray without success. Set whipstock 29 deg left of HS at 9862'. POOH. RDMO SWS.
10/15/98
RIH with tapered nozzle. Tagged whipstock at 9862'. Established injection at 1.5 bpm @ 1080 psig. Open choke and
circulate for cool down. Circulate 2 bbls Class 'G' neet cement, 17 bbls w/aagregate followed by 3 bbls neet. Close choke and
squeeze cement to perfs. Attain good squeeze pressure of 1600 psig. Contaminate cement with Biozan and jet wash
whipstock tray. Start POH. Over pull encountered when nozzle entered tailpipe. Attempt to RI H with no success. Appears
nozzle is stuck in tailpipe. Able to continue pumping with full returns. Worked pipe in an attempt to get free with no success.
Increased rate and continued to circulate bottoms up. Saw cement in returns, circulated at maximum rate until clean.
Established reverse circulation. Surged pressure, pipe still stuck. Pumped 9 bbls 15% HCL acid. Cycled acid around nozzle
and swept clean with gel. Worked pipe - still stuck. Circulated hole and stand-by. IA pressure has been zero throughout the
job.
10/16/98
Pumped 7 bbls HCL, followed by 10 bbls Mud acid, followed by 7 bbls HCL. Cycled around nozzle. Soaked ... surged
pressure and worked pipe with no success. Circulated acid out.
10/17/98
Pumped 260 bbls dead crude and worked pipe. Circulated dead crude to surface. Pumped 52 bbls of Schmoo-B-Gone. Let
soak. Followed with Biozan. Swept hole circulating with 2% KCL. Pumped coil volume of N2 at 1000 scfm. Worked pipe 10
cycles to 32k#. Still stuck. Pumped nitrified gel. Surged pressures, worked pipe.
10/18/98
Pumped straight gel to clean hole. Circulated hole clear of gel. Freeze protected well with diesel. Prep to cut coil. Rigged up
SWS. RIH and cut coil at 9155' (43' above coil connector). Cutter appeared at surface to have fired. Cutter hung up. Pulled
line free at weak point. Cold rolled coil and stdpped injector back on well.
10/19/98
Pulled maximum on coil. Coil still stuck. Prep for second cut. RIH with cutter #2. Tag top of cutter fish at 9140'. PU to 9135'
and make second cut. POH. Cold rolled coil and stdpped injector back on well. Pulled maximum and cycled pipe 10 times.
Still stuck. Decide to attempt cut up inside 7" tubing above 5 lA" tailpipe crossover. RIH with cutter #3. Cut coil at 9000'.
POH. Worked pipe and pumped. Still stuck. Freeze protected well with methanol. Free point calc. shows coil may be stuck
up hole, possibly as high as 5650'. Call out slickline. Prep coil for slickline LIB run.
10/20/98
Made two runs with LIB. Found impression of coil end @ 9045' wlm, verifying that the coil is cut. Circulate seawater to warm
wellbore. Pump 60 bbls of 15% HCL acid down backside. Wash 7" tubing from 4500' to 7000' with acid (4 cycles).
10/21/98
Circulate out acid. Freeze protected well with methanol. Worked pipe to 34k# pull. Still stuck. Call for 'Free-Point' tools. Rig
up SWS and Peak crane. Cut and prep coil at surface. RIH with APRS free-point tool. Found coil to be stuck at 6500' and
free at 6000'. Decide to cut coil at 6000'. Rig up to cut coil. RIH with cutter #4.
10/22/98
Cut coil at 6000'. Good indications at surface that cutter fired. POH with cutter. Pulled coil free with crane. Set slips and cold
rolled back to coil. Stdpped injector back on well. Coil free, POH and recovered 6000' of coil. Blew coil down with N2.
Rigged down DS CTU #2.
The well was left with approximately 3205' of 1.75' coil in the hole including the BHA (3" Tapered Nozzle w/5' - 2" dia. stinger).
The top of the coil is at 6000' with additional cuts at 9000', 9135' and 9155'. The nozzle is believed to be stuck inside the tail at
9204', below the 51/¢, 'XN' - nipple. The pipe is known to be stuck below 6000'.
The well is freeze protected with methanol to 2000'. The perforations are squeezed.
11/5/98
MIRU Dowell CT unit #2 and RIH with BHA #1. Latch fish on first attempt and pull to activate jars. Pulled off fish when jars
went and could not latch again. Pull out of hole to check GS - no marks. Ordered Baker GS with spear nose like the Radius
tool. Did not have spear with correct thread for Baker GS. Had piece machined. Rig up Baker GS on bottom of identical tool
stdng (BHA #2) and RIH. Latch on immediately and begin jarring, pulling to 33,900#. After 20 successful jar licks the tubing
came free. POOH with fish. Close slips on fish and pump to free tool stdng at the hydraulic disconnect. Rig off BOP's and
secure well. Rig down tool stdng and plan on returning in the morning to connect back onto the fish with the GS and pull the
fish.
1116
Dowell on location. Rig up to BOPs with BHA #3 and RIH. Latch fish and pull into lubricator. Rig off wellhead; cut and dress
ends of coil to prepare for cold roll. POOH with fish - clean cut on end of fish. Cut fish into 20' pieces on back of unit and
dispose of in metal dumpsters.
111719 8
RIH wl 3.65" decentralizer, 5.50" lib to 6433' wlm, couldn't get past, POOH w/no imp. RIH w/same to same, tded working
past but couldn't, POOH w/imp of possible cement. RIH w/4.475" gauge ring to same, couldn't work past, POOH. RIH w/4.5"
cent, 3" ddve down bailer to same, POOH w! inj. Mung w/cement chunks in bailer. RDMO
11/8/98
Miru DS Ctu #2. CTV=14500', CTV= 32.2 bbls. MU tools. RIH. Start UR at 6450', first obstruction at 6454'. UR suspected
cement stringers from 8385' - 8416'. UR fill from 8802' - 8808'. Stop pumping, dry tag at 8939'. Decide to UR to fish depth.
UR from 8938' - 8939', hard fill. Continue UR suspect aggregate from 8939' - 9017', softer fill. Began stalling motor at 9017';
suspect depth is the top of the CT fish. Reciprocate to clean hole. Drop 0.75" ball. Pump sweep. Pooh at 80% while
circulating. F.P with MeOH to 2000'. CCH. Cement residue on coil at surface. LD tools. UR was worn, looked like it worked
on hard fill or metal. Most likely occurred at 8939', dudng hardest U-reaming.
11/10/98
RIH w/3.625 t/s & 3.50 I.i.b. to 9,009',picture of cement. RIH w/2.25 ddve down bailer to 9,009',tap down, broke through,
made Several passes, sat down @ 9,035'. RIH w/3.60 gauge dng, sat down @ 9,009',able to work through ,made Several
passes ,sat down @ 9,030'. RIH w/3.625 t/s & 3.50 I.i.b. to 9,032',picture of cement. RIH w/2.50 I.i.b. to 9,035'>9,037',picture
of cement, possible coil tubing Marks on edge of I.i.b.
11/15/98
RIH w/5.5" lib to 9004' wlm POH w/impression of top of fish RIH w/overshot w/ 5.75" bellguide 9010' wlm poh w/o fish RIH
w/5.5" lib to 9004' wlm poh w/same impression RDFN
11/16/98
RIH w/overshot w/4.0" bellguide to 9010' wlm POH w/o fish ( went past top Of fish ) RIH w/o.s, w/5.75" bellguide to 9010'
wlm POH w/o fish ( top of fish has Changed position ) RIH w/same to same poh w/o fish ( not sure if we're getting all the up To
the grapples of o.s. RIH w/5.5' lib to same POH w/same impression RIH w/o.s. & 5.75" to same POH w/o fish ( getting coil up
to grapples on O.s. but unable to get in grapple ) RDFN
11/17~98
RIH w/3.625" roller dog style overshot to 9010' wlm POH w/o fish RIH w/same to same POH w/150' of c/t fish RIH w/4.15" lib
to 9035' wlm POH w/impression of possible cement RIH w/3" ddve down bailer to same POH w/full bailer ( chunks of cmt.
Aggreget, & shmoo )
11/28/98
MIRU, RIH w/3.625" decent., 3.70" lib to coil fish @ 9147' wlm, POOH w/imp. Of coil @ 1 o'clock. RIH w/3.625"
decentralizer, kick up tool, 41/~ gr, bait sub w/clock spline w/shod roller dog w/spear inside to same, couldn't latch, POOH
· RIH w/same, w/out clock and also w/long roller dog w/out spear, roller dog has 4.50" o.d. bellguide on bottom, attempt to
latch coil w/no success. POOH. RIH w/same, w/spline clock to same, latch coil tubing fish and POOH w/18.5' of coil and
Schlumberger 1.25" o.d. chemical cutter. RIH w/4.50" lib to coil fish @ 9162' wlm, POOH w/imp of coil. RIH w/3.625"
decent., Kick up tool, 4 ~ gr, bait sub w/clock spline w/ bowen grapple overshot to same, latch last piece of coil tubing fish, hit
approx. 10 oil jar licks @ 1000 lbs to 1800 lbs, moved fish up hole approx. 6', sheared gr, POOH. RIH w/41/~ gs to same, beat
on for 20 min., Moved up hole 1', total of 7', sheared off, POOH.
11/29/98
MIRU, RIH w/17' 2 5/8" stem, 4 ~ gs to coil fish @ 9156' wlm, beat on for 20 min., Oil jars not working good, sheared off,
POOH. RIH w! same, w/2 1/8 oiljars, 2 1/8 spangs w/same, to same, beat on for 20 min., No change, sheared off, POOH.
RU braided line, RIH w/same, w/new 41/~ gs to 9159' wire, hit 3 licks, gs sheared, POOH. RIH w/same, w/different gs to
same, beat on for approx. 1 ~/~ hrs., Looks like possibly pulled coil up hole 7', POOH to check tools. RIH w/same, to same,
beat on for approx. 1 hr., Sheared off, POOH. LDFN
12/9/98
RIH with 4" O.D. side wall hook, hydraulic centralizer, and ratchet tool. Tagged top of fish @ 9,430 ft. CTM. Able to push fish to
9,494 ft. CTM. Stacked 3,000# on fish, increased pump rate to 1.25 bpm to rotate hook. Rotated a total of 12 tums to get a full
360 degree with hook. Worked pipe. Pull up hole slowly through jewelry. POOH. At surface. Recovered fish ( With Exception of
coil tubing connector which was probably milled off ). Extension above nozzle was milled from the top to approximately 2/3 of
the total length. A sliver of the milled stinger was hung in the grapple. Possibly have some metal left in hole. SDFN.
STATE OF ALASKA
ALA,~. . OILAND GAS CONSERVATION COl~, .SSION
APPLICATION FOR SUNDRY APPROVAL
Plug back for CT sidetra~_
1. Type of Request:~ Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
2. Name of Operator
BP Explora. tion (Alaska) Inc.
3. Address
P.O. Box196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
10688 feet Plugs (measured)
9537 feet
10535 feet Junk (measured)
9396 feet
Type of well: _
Development [] Service
Exploratory
Stratigraphic
o
Perforation depth: measured
true vertical
Datum Elevation (DF or KB)
KBD = 55.09 AMSL
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
R-06i
9. Permit Number
79-52
10. APl Number
50-029-20388
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
fill at 10535' MD (11/89)
Length Size Cemented MD TVD
110 20x30 605 c.f. 144 144
2627 13-3/8" 3863 c.f. 2661 2661
9706 9-5/8" 1514 c.f. 9740 8671
1454 7" 336 c.f. 9227-10681 8225-9530
ORI61NAL
9861'- 9935' Sqzd: 10076-85,10105-29 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) Plug with
P kr @ 10072'
subsea 8723'-8790' (Sag R.) 8849'-8973' (four Ivishak intervals)
Tubing (size, grade, and measured depth) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227'
Packers and SSSV (type and measured depth)
9 5/8" TIW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083'; 7" SSSV landing
nipple at 2017'
13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch
14. Estimated date for commencing operation
6/29/98
15. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service Water Injection
Date approved
16. If proposal was verbally approved
Name of approver
Contact Engineer Name/Number: Ted Stagg 564-4694
Prepared By Name/Number: Theresa Mills 564-5894
17.1 hereby certify that the fore/go'~nd
Signed Ted Staqq ~//~c~
correct to the best of my knowledge
Title Coiled Tubing Drilling Engineer
Commission Use Only
Date
Conditions of Approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~" Location clearance__
I Approval No. ,~'~_ [,~_~
Mechanical Integrity Test Subsequent form require~ 10-
,,,~ o'keefe6 . .
Approved by order of the Commission .~r~,iGINAL SIGNED BY ~,gv e_,,~., ~ ,,,,Commissioner
Form 10-403 Rev. 06/15/88 Robert N. Ct~ristenson .?'~i ..~....~-
Date ~ -.~ i -" ~' ~
Submit In Triplicate
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: June 10, 1998
To:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Blair Wondzell
Sr. Reservoir Engineer
Re:
Well R-06i Prep for CT Sidetrack
Well R-06i is scheduled for a through tubing sidetrack to be drilled with
coiled tubing. The following summarizes the procedure required to
prepare R-06i for sidetracking and is submitted as an attachment to
Form 10-403. A schematic diagram of this proposed completion is
attached.
1. Inner annulus was successfully pressure tested on 4/14/98.
2. Kinley caliper was run on 4141198.
3. RU E-line and set top of whipstock at 9920' MD.
4. RU service coil and abandon existing perforations with approx. 20
bbls. of cement by downsqueezing cement past the whipstock.
(Note: The whipstock will be set just below existing Sag R.
perforations. These Sag R. perfs will be squeezed and pressure
tested as part of this procedure. When the sidetrack is completed,
the 3 1/2" liner will be cemented to approx. 180 ft above the
window thereby covering the Sag R. perfs with the cemented liner
lap also.)
5. Pressure test abandonment cement to 1500 psi with AOGCC
witness.
6. The window will be milled with the drilling coil.
Ted Stagg
CT Drilling Engineer
cc: Well File
Petrotechnical Data Center
TREE: 6" McEvoy
WELLHEAD: McEvoy
ACTUATOR: Otis
R-,,6ai Proposed Comple,,on
KB. ELEV = 55.09'
BF. ELEV = 21.31'
13-3/8",72#/ft,
L-80, BTRS
13 3/8" Sh°e I 2661 I
FOC-
al,,..._
SSSV LANDING NIPPLE I
( Otis )( 5.96" ID)
I
2017
7",26~/ft, L-80,
TUBING
TUBING ID: 6.276"
CAPACITY: .0382 BBL/FT
PERFORATION SUMMARY
REF: LOG: BHCS 9-27-79
SIZE I SPF I INTERVAL C~,PEN/SQZ'D
~"14I~6~-9~3~ OpeN
3~I ~ I9~s~-9905 OPEN S-9S
~-3~S"I ~ I
~-~"1" I
3_3~S,,I 4 I
3-3/8"1 4 I
10000-10028
10038-10066
10085-10105
10129-10136
OPEN/11-89
OPEN/11-89
OPEN/Il-89
OPEN/11-89
Top 7" Liner Hanger I 9227
9 5/8" 47# L-80 BTRS shoe 9740
MARKER JOINT I 9933'
Top Whipstock approx. 9920' MD
Abandonment cement to be
downsqueezed past whipstock
7" Otis WD PACKER
4" MIN ID
4 1/2" "X" NIPPLE
(Otis) (3.813" ID)
4/12 .... XN" NIPPLE
(Otis) (3.725" ID)
4/12" WLEG
(Otis) (4"ID)
10072
7"x5 1/2"
CROSSOVER
SLIDING SLEEVE
Otis XA
( 4.562" MIN. ID)
9085
9098
9134
9187
9209
9221
9-5~8" PACKER
( TIW )(4.75"1 D)
5 1/2 .... X" NIPPLE
(Parker) (4.562 X" ID)
5 1/2 .... XN" NIPPLE
(Parker)(4.55" ID)
5 1/2" Seal Assembly /
No Seal
Could not get back down I 9210' ELMD
in the liner top with the
I
Seal Assembly
4 1/2" open hole
3 1/2" cemented liner
PBTD (Junk)
7" ,29#/ft, L-80, BTRS
I10630
I1°681
ALA~._~. OIL AND GAS CONSERVATION COMMISSI~
REPORT 7 SUNDRYWELL OP[ ATIONS
1. Operations performed: Operation shutdown
Stimulate Plugging Perforate
Pull tubing Alter casing Repair well Other x
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612. Anchoraae, Alaska 99519-6612
4. Location of well at surface
729' NSL. 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1864' SNL, 1224' WEL, SEC. 32, T12N. R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32. T12N, R13E, UPM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBD = 55.09 AMSL
7. Unit or Property name
Prudhoe Bay Unit
feet
8. Well number
R-06i(32-32-12-13) PBU
9. Permit number/approval number
79-52 /
10. APl number
50.029-20388
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10688 feet
BKB 9537 feet
10535 feet
BKB 9396 feet
Plugs (measured)
Junk (measured) fill at 10535' MD (11/89)
Casing Length Size Cemented
Structural --
Conductor 110 20X30 605 c.f.
Surface 2627 13 3/8 3863 c.f.
Intermediate 9706 9 5/8 1514 c.f.
Production --
Liner 1454 7 336 c.f.
Perforation depth: measured
9861'- 9935' (Sag R.)
10fl7fi-RFi. l fl 1 ~3R-P.q -
true vertical~ubsea 8723'-8790' (Sag R.)
8849'-8973' (four Ivishak intervals)
Measured depth True vertical depth
BKB
144 144
2661 2661
9740 8671
9227-10681 8225-9530
Tubing (size, grade, and measured depth) 7' L-80 to 9085' 5 1/2" L-80 9085' to top of 7' liner at 9227'
Sqzd:
Packers and SSSV (type and measured depth)9 5/8' TIW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083';
7" SSSV landino nioole at2017' l'3 ~' r ~ , ·
13. Stimulation or cement squeeze summar~ee Attachment ~ ~, L ~ ! V
14.
Intervals treated (measured)
Treatment description including volumes used and final pressure
ORIGINA
Representative Daily Average Production or Injection Data
JAN 20 ]998
Prior to well operation
Subsequent to operation
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
13000
15000
Tubing Pressure
30O
1000
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Oper~i~ons Oil Gas Suspended
17. I her~,~y,cdertify thj~t the ~r~going is trj,!,e ~d correct to the best of my knowledge.
Si Title TechnicalAssistantlll
Service water ~n_i, ection weI1
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
._
R~6
DESCRIPTION OF WORK COMPLETED
Stimulation Operation
11/02/97
A_HCL Bullhead StimulationTreatment was performed using the
following fluids:
SUMMARY
Load 2968 gal. APG Dispersent Wash BB-1 at ARCO Chemical Pad. Mix with
353 bbls of 140°-fresh water from the ARCO fresh water plant.' Arrive on location
and rig up Dowell Stimulation Pump Van. Pressure test hard lines to 4,000 psi.
Pump 15 bbls methanol followed by 428 bbls caustic surfactant tubing wash.
Pump 15 bbls methanol to freeze protect lines and well head. Shut down for a 3
hour soak period. Pump 177 bbls of produced water to displace surfactant out of
the tubing. Freeze protect with 25 bbls methanol. Put well back on MI injection.
~BBLS.
428
53
177
653
·
_. .
Fluids Pumped _.
Methanol
Produced Water.
TOTAL
Description
Caustic surfactant
STATE OF ALASKA
^L~SKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown __ Stimulate__ Plugging__ Perforate
Pull tubing__ Alter casing __ Repair well Other__
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development
Exploratory
Stratigraphic
Service X
4. Location of well at surface
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
ORIGINAL
6. Datum elevation (DF or KB)
KBD = 55.09 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-06i(32-32-12-13) PBU
9. Permit number/approval number
79-52 /
10. APl number
50- 029-20388
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective.depth: measured
true vertical
10688 feet Plugs (measured)
BKB 9537 feet
10535 feet Junk (measured)
BKB 9396 feet
fill at 10535' MD (11/89)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length
..
110
2627
9706
..
1454
Size Cemented Measured depth True vertical depth
BKB
20X30 605 c.f. 144 144
13 3/8 3863 c.f. 2661 2661
9 5/8 1514 c.f. 9740 8671
7 336 c.f. 9227-10681 8225-9530
9861'- 9935' (Sag R.) Sqzd: 10076-85,10105-29
10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) Plug with Pkr @ 10072'
measured
true vertical
subsea 8723'-8790' (Sag R.)
8849'-8973' (four lvishak intervals)
Tubing (size, grade, and measured depth)
7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227'
Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083';
7" SSSV landing nipple at 2017'
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
13000
15000
Tubing Pressure
3OO
1000
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operati,~s __
17. I hereb~ certify that the fore~e~nc~ is true and ~ire~ to the best of my knowledge.
Sign'd-' : Title Tech./ca/Ass/stant///
Form 10-404 R~v 06/15/8~
16. Status of well classification as:
Oil __ Gas Suspended
Service water injection well
Date
SUBMIT IN DU'PLICATE
WELL R-06(32-32-12-13)
6/06/95
Reperf
The following interval were reperforated using 3
guns, 6 SPF, random orientation and 60° phasing.
9861' - 9906' MD
3/8"
LAP~RY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 10 June 1995
RE:
Transmittal of Data
Sent by: PRIORITY MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
7 - 5
7 ~ -- / / C-05 (41-25-11-13)
(44-31-11-14)
(41-27-11-13)
?<:~ - (0t~F-34 (44-35-12-13)
DESCRIPTION
PFC/PERF FINAL BL+RF
PFC/PERF FINAL BL+RF
GR/CCL FINAL BL+RF
PLS FINAL BL+RF
PLS FINAL BL+RF
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
ECC No.
1680.04
5809.07
5830.02
6054.04
6181.05
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by:
Date:
Please sign snd~e~n%~$
PetrotechniealData Cente~
BP Exploration (Alaska) Ina
J st Benson Boulevard
a 99508
ed b x
RE E[V D
- dUN 1 6 1995
Oil & Sas Cons. Comm~ .~JO_r~
Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown __ Stimulate X Plugging
Pull tubing __ Alter casing Repair well m
Perforate__
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBD = 55.09 AMSL
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-06i(32-32-12-13) PBU
9. Permit number/approval number
79-52 /
10. APl number
50- 029-20388
11. Field/Pool
Prudhoe Oil Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10688 feet Plugs (measured)
BKB 9537 feet
10535 feet Junk (measured)
BKB 9396 feet
fill at 10535' MD (11/89)
Casing
Structural
Conductor
Surface
Intermediate
Production '
Liner
Perforation depth:
Length
..
110
2627
9706
__
1454
Size Cemented Measured depth True vertical depth
BKB
20X30 605 c.f. 144 144
13 3/8 3863 c.f. 2661 2661
9 5/8 1514 c.f. 9740 8671
7 336 c.f. 9227-10681 8225-9530
9861'- 9935' (Sag R.) Sqzd: 10076-85,10105-29
10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136'(Ivishak) Plug with Pkr@10072'
measured
true vertical
subsea 8723'-8790' (Sag R.)
8849'-8973' (four Ivishak intervals)
Tubing (size, grade, and measured depth)
7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227'
Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083';
7" SSSV landing nipple at 2017'
13. Stimulation or cement squeeze summary See Attachment
14.
Intervals treated (measured)
Treatment description including volumes used and final pressure
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl
RECEIVED
JUN -7 1995
....
A~ch0r~ ~,
Casing Pressure Tubing Pressure
Prior to well operation
Subsequent to operation
13000
15000
300
1000
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations ~-,
16. Status of well classification as:
Oil __ Gas Suspended
Se rvice water injection well
17. I hereby c, ertify that the foregoing ~~rrect to the best of my knowledge.
Signed .... ~ ,,v.,4,~,u~a~,~., ~.. Title SeniorTechnica/Assistantll
Form 10-40~*R'ev 06/15/88 ~
D a t e
SUBMIT IN EfUPL~iCATE
05/11/94
WELL R-06i(32-32-12-13)
Stimulation Operation
A HCL Acid Wash Treatment was performed using the following
fluids:
SUMMARY
1. BULLHEADED 262 BBLS 15 PERCENT HCL WITH 10 PER CENT.
2. DISPLACED WITH 450 BBLS OF FILTERED SEAWATER AT 120
DEGREES. (62 BBLS OVER DISPLACED).
3. TURNED OVER TO INJECTION. (INJECTION INCREASED
FROM 7M TO 14M BWPD.)
BBLS.
262
450
712
FLUIDS PUMPED
DESCRIPTION
15 PERCENT HCL WITH 10 PERCENT BY
VOLUME XYLENE.
FILTERED SEAWATER AT 120 DEG F.
RECEIVED
STATE OF ALASKA
/~"'"SF'''-~ ' AND GAS CONSERVATION COMMI"'-"ON ~i r.,
REPOR1 O :.SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate Plugging
Pull tubing __ Alter casing Repair well
Perforate X
Other__
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2468' SNL, 2875' WEL, SEC. 02, T11N, R13E, UPM
At top of productive interval
1052' NSL, 435' WEL, SEC. 03, T11N, R 13E, UPM
At effective depth
1033'NSL, 610' WEL, SEC. 03, T11N, R13E, UPM
At total depth
1030'NSL, 646' WEL, SEC. 03, T11N, R13E, UPM
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE = 66. 77 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
F-09 (44-03-11-13) PBU
9. Permit number/approval number
79-76 /
10. APl number
50- 029-20403
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length -
Structural --
Conductor 110
Surface 2671
Intermediate 9361
Production --
Liner : 10263
Perforation depth:
10300 feet
BKB 9287 feet
10165 feet
BKB 9157 feet
Plugs (measured)
Junk (measured)
fill at 10165'MD (10/89)
Size Cemented Measured depth True vertical depth
BKB
20 x 30 7. 9 c.y. 139 139
13 3/8 4269 c.f. 2700 2699
9 5/8 1360 c.f. 9390 8418
7 490 sx
measured 10006'-10050', 10060'-10070'
10292 9279
Sqzd: 9904'-9924', 9934'-9952', 9963'-9996'
true vertical subsea
8954'-9015' (two intervals)
Tubing (size, grade, and measured depth) 3 1/2" L-80 to 8785' with 2 7/8" tailpipe to 8921'
Packers and SSSV (type and measured depth) 7" BOT 3H packer at 8813'; 3 1/2" SSSV at 1980'
n cr'cl\lFl')
13. Stimulation or cement squeeze summary see attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
MAY - 9 1995
A~ska 0il & Gas Cons. Commission
Anchora ~
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
1595 19207 60 0
1641 19947 58 0
Tubing Pressure
496
998
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations Oil X Gas Suspended
17. I he reby c~rtify th at the for g'o'lng is.~tr~e.j/and co_.rrect to the best of my knowledge.
Si~ned~~J4~ ~_,e!/,...// ~-'1~-' Title SeniorTechnicalAssistantll
Form 10-404J Rev 06/15/88
Service
SUBMIT IN DU~Lr'CATE
WELL F-09(44-03-11-13)
Addoerf
10/28/94
The following additional interval were perforated using 2"
guns, 4 SPF, 180° orientation and 0° phasing.
9985'- 9995'MD
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 19 April 1995
RE: Transmittal of Data
Sent by: PRIORITY MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
DESCRIPTION
1 PLS FINAL BL+RF
1CCL FINAL BL+RF
1 PLS FINAL BL+RF
1 GR/CCL FINAL BL+RF
1 PLS FINAL BL+RF
ECC No.
Run # 1 1680.03
Run # 1 4608.05
Run # 1 6300.04
Run # 1
Run # 1
6407.00
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by: Date:
Please s~] and return to;.
Pet~otechnlcal Data Centop
RECEIVED
900 East Benson Boulevard
ae~[~e ~d~~~ Oil & Gas Cons. Commission
Ancl~orage
STATE OF ALASKA
ALAS'-"~OIL AND GAS CONSERVATION COMMISSI("--
REPORT b,-: SUNDRY WELL OPEnATIONS
1. Operations performed: Operation shutdown Stimulate X Plugging
Pull tubing __ Alter casing __ Repair well
Perforate
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development
Exploratory
Stratigraphic
Service ×
4. Location of well at surface
729' NSL, 1400' El/FL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848'SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
ORiGiNAL
6. Datum elevation (DF or KB)
KBD = 55.09 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-06i(32-32-12-13) PBU
9. Permit number/approval number
79-52 /
10. APl number
50- 029-20388
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10688 feet
BKB 9537 feet
Plugs (measured)
10535 feet Junk (measured)
BKB 9396 feet
fill at 10535' MD (11/89)
Casing Length
Structural --
Conductor 110
Surface 2627
Intermediate 9706
Production --
Liner 1454
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth)
Size Cemented Measured depth True vertical depth
BKB
20X30 605 c.f. 144 144
13 3/8 3863 c.f. 2661 2661
9 5/8 1514 c.f. 9740 8671
7 336 c.f. 9227-10681 8225-9530
9861'- 9935' (Sag R.) Sqzd: 10076-85,10105-29
10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) Plug with Pkr @100 72'
subsea 8723'-8790' (Sag R.)
8849'-8973' (four ivishak intervals)
7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227'
Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 9134'; 7" Otis WD packer at 10072' w/'l'P assy. to 10083';
7" SSS V landing nipple at 2017'
13. Stimulation or cement squeeze summary See Attachment R E C ~ iV E D
14.
Intervals treated (measured)
JUN 2'1 1994
Treatment description including volumes used and final pressure
~i~,ska 0ii & Gas Cons. Commission
Representative Daily Average Production or Injection Data ArmhDra~
Prior to well operation
Subsequent to operation
OiI-Bbl Gas;M~ Water-Bbl Casing Pressure Tubing Pressure
.... 1152 -- 1834
.... 14988 ~ -- 1874
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil Gas Suspended
Service water in_iection weft
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~,n~,~~, & "~~~ Title Senior TechnicalAssistantl
Form 10-404[ Rev 06/15/88 !
SUBMIT IN Dt~PLIdATE
03~9~3
WELL R-06i(32-32-12-13)
Stimulation Operation
A HCL Acid Wash Treatment was performed using the
following fluids:
SUMMARY
RIH WITH 3.25" JETTLNG NOZZLE AND SET DOWN IN TAILPIPE AT
10090' CTD. JETTED THRU FIRM RESTRICTION AND RIH TO 10430 FT
CTD WHILE JETTING. CIRC OUT MUNG AND LET WELL FLOW, WHILE
BJS RIGGED UP. PUMPED 12 BBL DIESEL AND LET SOAK, PUMPED 53
BBL 15%HCL/15%XYLENE AND LET SOAK, PUMPED 57 BBL
15%HCL/15%XYLENE AND LET SOAK. RECIP CT ACROSS PERFS
DURING EACH STAGE. EACH STAGE PRODUCED BETYER INJECTMTY
(DECLINING WHP). VERY GOOD RESPONSE TO ACID TREATMENT.
POOH AND R/D CTU. PUT WELL ON INJECTION AT 0200 HRS.
INJECTING AT 16000 BPD AT 1000 HRS.
FLUIDS PUMPED
BBLS. DESCRIPTION
269 SEAWATER
12 DIESEL
110 15 % HCL / 15 % XYLENE ACID
26 MEOH
fjh
6/20/94
RECEIVED
JUN 2 1 199
Anchorace
RECEIVED
Alaska 011 & Gas Cons. Commission
Anchorage
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 28 April 1994
Transmittal of Data
Sent by: ANCHORAGE XPRES
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
~~ R-35 (23-33-12-13)
1 PLS PROFILE FINAL BL
/1 PLS GASLFT FINAL BL
1 PLS PROFILE RF SEPIA
//1 PLS GASLFT RF SEPIA
~,-%'l,~ R-32 (22-33-12-13)
/1PLS INJPROF.FINAL BL
1PLS INJPROF.RF SEPIA
3 q_5% R-06
1 PLS FINAL BL
/1 PLS FINAL RF SEPIA
~b~. F-14 (33-35-12-13)
PLS FINAL BL
1 PLS FINAL RF SEPIA
~ PLS FINAL BL
1 PLS FINAL RF SEPIA
~0.~7~ F-14 (33-35-12-13)
.
~..
.
...
1 PLS FINAL BL
1 PFC/PERF RF SEPIA
~L-t~O H-17 (34-15-11-13)
/1 DIFF.TEMP. FINAL BL
1 DIFF.TEMP. RF SEPIA
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run ~ 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run ~ 1
Run. # Ii '
Run ~ 1
Run # 1
Run # 1
ECC No.
6136.03
6106.05
1680.02
959.06
3560.01
959.05
5665.05
STATE OF ALASKA
A. ~,KA OIL AND GAS CONSERVATION COMMIL JN
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Stimulate X Plugging__ Perforate__
Pull tubing Alter casing Repair well
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A- water injection well
At effective depth
1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
Other
6. Datum elevation (DF or KB) ~.l
KBD = 55.09 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-06i(32-32-12-13) PBU
9. Permit number/approval number
79-52 /
10. APl number
50- 029-20388
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured 10688 feet
true vertical BKB 9537 feet
Effective depth: measured 10535 feet
true vertical BKB 9396 feet
Casing Length Size
Structural --
Conductor 110 20X30
Surface 2627 13 3/8
Intermediate 9706 9 5/8
Production --
Liner 1454 7
Plugs (measured)
Junk (measured) fill at 10535' MD (11/89)
Cemented Measured depth True vertical depth
BKB
605 c.f 144 144
3863 c.f. 2661 2661
1514 c.f. 9740 8671
336 c.f. 9227-10681 8225-9530
Perforation depth: measured 9861'- 9935' (Sag R.) Sqzd: 10076-85,10105-29
10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) Plug with Pkr@10072'
true vertical subsea 8723'-8790' (Sag R.)
8849'-8973' (four Ivishak intervals)
Tubing (size, grade, and measured depth) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227'
Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083';
7" SSSV landing nipple at 2017'
13. Stimulation or cement squeeze summary
14.
SeeAttachment RECEIVED
Intervals treated (measured)
Treatment description including volumes used and final pressure S EP 1
Representative Daily Average Production or ~niectl'Oh"D'Affi' ~. -"'¥". ....
Oil-Bbl Gas-Mcr Water-Bbl -Casing 'Pres~;ilOr gl~'ubing Pressure
Prior to well operation
Subsequent to operation
0 '- 0
10410 -- 1844
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations
16. Status of well classification as:
Oil Gas Suspended
Service water in_iection well
17. I hereby ce~ify that the foregoin~.g'lrue and correct to the best of my knowledge.
Si,ned ~--./~/~ :/ ..~4:9~.' Title SeniorTechnicalAssistantl
Form 10-4~"~'R~v 06/15/88 ~'
Date ~',//,~'//.,,,7
SUBMIT IN D'[JP~'ICATE
1/08/92
1/10/92
2/12/92
WELL R-06i(32-32-12-13)
AGID Stimulation Operation
Performed a HCL Perf Wash using the following fluids below:
FLUIDS. PUMPED:
72 BBLS 15% HCL/iO% Xylene
500 BBLS Slick Produced Water
43 BBLS Methanol
Performed a Bullhead Peroxide using the following fluids below:
FLUIDS PUMPED:
86 BBLS 70% DIESEL/20% Xylene/10% MIBK
142 BBLS Solvent Wash
868 BBLS Base Water(Filtered Produced Water)
143 BBLS 7.5% HCL
119 BBLS CLAY-FIX(NH4CL) Flush Water
637 BBLS 2% Hydrogen Peroxide
179 BBLS Half Strength Mud Acid (6% HCL/1.5% HF)
71 BBLS 3% HCL
75 BBLS METHANOL
Performed a Bullhead Peroxide using the following fluids below:
FLUIDS PUMPED:
284 BBLS 7.7% HCL AND ADDITIVES
285 BBLS 2.0% NH4CL and Additives mixed with PW
317 BBLS PW
fjh
5/20/93
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date: 12/04/92
T#:84145
FROM:
Information Control
Well Records MB3-3
SUBJECT: BP CASED HOLE LOGS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4004.
?W.t-Z. G-24
?z- ~ R-061
R-30
~0~-~,~ H-28
,~'~'-' ~'~ R-01
co ~-- ~ X-241
GAS ENTRY SURVY 09-OCT-92 #1 10150-10315 CAMCO
INJECTION PROF 17-OCT-92 #1 9800-10200 CAMCO
PROD PROF SURVY 15-OCT-92 #1 11100-11580 CAMCO
LEAK DET LOG 07-OCT-92 #1 SURF-11700 CAMCO
GAS LIF'i'SURVY . 07-OCT-92 #I ' 2500-9174 CAMCO
INJECT PROF LOG 12-OCT-92 #1 9050-9456 CAMCO
5"
5"
5"
5"
CEIVED
DEC 1 8 1992
Alaska 0ii & Gas Cons. Commission
Anchorage
Distribution:
ARCO
CHEVRON
EXXON
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
A.FRANKENBURG
STATE OF ALASKA .~--_.
, ":KA O,L AND GAS CONSERVAT,ON COMM ~N 0 ~
REPOR OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate × Plugging
Pull tubing Alter casing Repair well
Perforate
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection weft
At effective depth
1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service X
6. Datum elevation (DF or KB)
KBD = 55.09 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-06i(32-32-12-13) PBU
9. Permit numbedapproval number
79-52/
10. APl number
50- 029-20388
11. Field/Pool
Prudhoe 0il Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
true vertical
Length
..
110
2627
9706
measured
true vertical
10688feet
BKB 9537feet
10535feet
BKB 9396feet
Plugs (measured)
Junk (measured) fill at 10535' MD (11/89)
Size Cemented
20X30 605 c.f.
13 3/8 3863 c.f.
9 5/8 1514 c.f.
..
1454 7 336 c.f.
9861'- 9935' (Sag R.)
Tubing (size, grade, and measured depth)
Measured depth True vertical depth
BKB
144 144
2661 2661
9740 8671
9227-10681 8225-9530
Sqzd: 10076-85,10105-29
10000;10028', 10038;10066', 10085;10105', 10129;10136'(Ivishak) Plug with Pkr@10072'
subsea 8723;8790' (Sag R.)
8849'-8973' (four ivishak intervals)
7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227'
Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 9134'; 7" Otis WD packer at 1~,072' w/TP assy. to 10083';
7" SSSV landing nipple at 2017'
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and fin~il pressure
Prior to well operation
Subsequent to operation
Representative Daily Average Production ¢.r. lnjection Dal~
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressu,'~
.... 2500 --
.... 7000 --
Tubing Pressure
1920
1950
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil Gas Suspended
Service water in_iection well
17. I hereby cert. jfy that the~ foregoingj~'tve an~_~rect to the best of my knowledge.
signed ~,, ~..~~ (7/'?,~,;~.~ Title SeniorTechnicalAssistantl
:orm 10-404~ev' 0~/15/88 "2/
SUBMITIN DUISLIC~TE r~
12/12-13/91
12/14-15/91
WELL R-06i(32-32-12-13)
HCL
A HCL/HF Treatment was performed using the
following fluids'
51 bbls 70% Diesel/20% Xylene/10% MIBK
43 bbls Solvent Wash(PW, 25% Xylene, 2%
Surfactant, 10% Musol)
22 bbls 15% HCL
24 bbls 12.5% Sodium Hypochlorite/5% Sodium
Hydroxide
72 bbls Half Strength Mud Acid(6% HCL/1.5% HF)
24 bbls 3% HCL
24 bbls Flush Water(PW, 2% Ammonium Chloride,
1% Surfactant)
133 bbls Filtered PW
55 bbls Methanol
Stimulation #1
A HCL/HF Treatment was performed using the
following fluids:
51 bbls 70% Diesel/20% Xylene/10% MIBK
43 bbls Solvent Wash(PW,25% Xylene,
2%Surfactant, 10% MUSOL
22 bbls 15% HCL
24 bbls 12.5% Sodium Hypochlorite/5% Sodium
Hydroxide
72 bbls Half Strength Mud Acid(6% HCL/1.5% HF)
24 bbls 3% HCL
24 bbls Flush Water(PW,2% Ammonium Chloride,
1% Surfactant)
171 bbls Filtered PW
75 bbls Methanol _::: . '.-'"
Stimulation #2
9/24/92
fjh
RECE V O
Alaska 0il & Gas Cons.
BP EXPLORATION
BP Exploralion (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 08/12/92
T# 83797
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
07/19/92 #1
07/25/92 ~1
07/22/92 #!
07/27/92 #!
07/21/92 31
07/25/92 #!
07/27/92 ~!
07/19/92 ~!
07/18/92 ~1
07/18/92 ~i
07/24/92 ~1
07/20/92 ~!
9480 00- 9815.00 CAMCO 5 "
2300 00-12756 00 CAMCO 2/5"
11150 00-11390 00 CAMCO 5 "
9800 00-10068 O0 CAMCO 5 "
10900 00-11110 00 CAMCO 5 "
2300 00- 9290 00 CAMCO 2/5"
11250 00-11898 00 C~CO 5 "
8600.00- 9744 00 C~CO 5 "
9100.00- 9420 00 CAMCO 5 "
10800.00-11177 00 CAMCO 5 "
9680.00-10005 00 CAMCO 5 "
11900.00-12720 00 CAMCO 5 "
Information Control
Well Records
Adrian J. Martin
RECEiVED
AU~ 2 5 1992
Alaska 0/I & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P,O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 03/24/92
T# 83343
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
R-06 ~' ~'~ INJ
R-12 ~' 3~-- COMPLETION
F-48 ~/'"'.~ CCL/PERF
Y-28 ~/--~- CL
c-13 ~-~2 Psc
W-10 ~-/~TUBING CUTTER
x-0~ ~_~ ~s
5 "
03/18/92 #1
03/20/92 #1
03/19/92 #1
03/16/92 #1
03/12/92 #1
03/11/92 #1 .
03/13/92 #1
03/11/92
9750.00-10074.00 SCH 5 "
10595.00-10936.00 $CH 5 "
12000.00-12584.00 ATLAS 5 "
8806.00- 9408.00 ATLAS 5 "
10905.00-11297.00 ATLAS 5 "
13534.00-13710.00 ATLAS 5 "
11659.00-12532.00 ATLAS 5 "
11100.00-12116.00 ATLAS
Information Control
Well Records
Adrian J. Martin
RECEIVED
MAR 3 1 1992
Alaska 0ti & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P,O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
DATE: 01/28/92
T# 83212
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
JlN-19N-19 ~]-36 PERFCCL/PERF
JS-08~Z~ PERF
g~,~- 07 LEAK DET
01/05/92 ~1
01/11/92 #1
01/15/92 #1
01/02/92 #1
12/31/92 #1
01/14/92 #1
01/18/92 %1
9792.00-10683.00 HLS
9840.00-11790.00 HLS
9750.00-10082.00 HLS
9156.00- 9770.00 HLS
9100.00- 9750.00 HLS
9001.00--9205.00 HLS
1740.00-10602.00 HLS
~
Information Control
Well Records
Adrian J. Martin
RECEIVED
FEB 1 2 199Z
Alaska 0ii & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
/' :/
DATE: 01/03/92
T# 83152
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
2000.00-11539.00
CAMCO
2/5"
~ ~_,_~~.~K/ ~s ~-/o~/~ #~ 9~5o.oo- 9~o.oo c~co 5 "
~t-I~ PROD-F 12/07/91 #1 9150.00- 9520.00 CAMCO 5 "
~-~ B-13~// INJ 12/09/91 #1 10586.00-10935.00 CAMCO 5 "
~.~. ~--:%'F.~.~ ~Nj 12/04/91 #1 9800.00-1008O.00 CAMco 5 "
~-}~.D-08 ~/~ -- CCL 12/08/91 #1 8758.00-10259.00 CAMCO 5 "
80-JAqM---~ ~/ ~ INJ 12/06/91 #1 9350.00- 9850.00 CAMCO 5 "
- ~ Y~J/ GAS LIFT SURVEY 12/07/91 #1 100.00- 9130.00 CAMCO 2 "
~1~.~ E~-13 >'.,/, CCL 12/09/91 #1 10500.00-10867.00 CAMCO 5 "
~.,~--CD'F~ ~.~ ~/0~/~ #~ ~-~50.00-~3~5.00 c~co 5 "
~1-1~, X-18 ~ PROD-F 11/08/91 #1 10000.00-11010.00 CAMCO 5 "
~-~6Z-32 ~// TEMP 11/05/91 #1 9900.00-11038.00 CAMCO 5 "
~,~ P-15 ,~/~ PROD-F 11/09/91 #1 12000.00-12337.00 CAMCO 5 "
~-~ N-21J_~ CA 11/06/91 #1 9750.00-11270.00 CAMCO 5 "
~%~ S-03~ TEMP 12/06/91 #1 11095.00-12076.00 CAMCO 5 "
~-~ W-16~ /, PROD-F 11/21/91 #1 5300.00-11200.00 CAMCO 5 "
q%-~ Y-31~~; GAS LIFT SURVEY 11/24/91 #1 0.00- 2840.00 CAMCO 2/5"
~)-~Y-15~v// GAS LIFT SURVEY 11/24/91 #1 0.00- 9860.00 CAMCO
2
,,
~,~D~ .~/ GAS ENTRY 12/08/91 #1 9950.00-10240.00 CAMCO
5 "
~'/O°Z-20~/~ GAS ENTRY 12/05/91 #1 11100.00-11450.00 CAMCO
YY GAS5 "
~.?//- J-02 ENTRY 12/05/91 #1 9850.00-10200.00 CAMCO
5 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
JAN 0 8 1992
Alaska 011 & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :07/15/91
T#:82584
FROM:
Information Control
Well Records LR2-1
SUBJECT: BP CASED HOLE FINALS
Enclosed is your copy of the matedai listed below, if you have any questions, please contact BP
Well Records at (907) 564-44'!.5.
A~06
B-05
B-25
~,..~ B-25
1~'F-26
G-26
M-09
M-09
4~/. M-09
/~-P-12
R-06
R-06
R-21
R-21
,Y-32
Jewelry Log 05/24/91 #1 9300-9500 HLS 5"
CL 05/06/91 #1 10489-10788 HLS 5"
Jewelry Log 05/30/91 #1 9700-10113 HLS 5"
Perf 05/30/91 #1 9700-10113 HLS 5"
CL Baker Packer 06/28/91 #1 9900-10560 HLS 5"
Peal 03/15/91 #1 10362-10580 HLS 5"
Production Log 06/05/91 #1 9900-10289 HLS 5"
Gas Lift Survey 06/05/91 #1 9900-10289 HLS 5"
Production Log 06/05/91 #1 9900-1~0289 , HLS 5"
Perf 06/06/91 #1 8930-9550 -HLS 5"
Production Log 06/15/91 #1 9700-10080 HLS 5"
Production Log 06/15/91 #1 9700-10080 HLS 5"
Production Log 06/14/91 #1 10100-10380 HLS 5"
Production Log 06/14/91 #1 10100-10380 HLS 5"
Production Log 06/15/91 #1 12200-12760 HLS 5"
Production Log 06/15/91 #1 12200-12760 HLS 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
STATE OF ALASKA :-~
AL ..,KA OIL AND GAS CONSERVATION COMMIS..,ON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Stimulate 3( Plugging
Pull tubing Alter casing
2, Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
Repair well
5. Type of Well:
Development __
Exploratory
Stratigraphic ~
Service X.
- 6 199t
Alaska .0il .& Gas Cons. Commis$[ot~
Anchorage.'
12. Present well condition summary
Total depth: measured
true vertical
10688feet
BKB 9537feet
Plugs (measured)
Perforate
Other
6. Datum elevation (DF or KB)
KBD , 55.09 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-06 (32.32.12.13) PBU
9. Permit number/approval number
79-52/8-482
10. APl number
50- 029-20388
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured
true vertical
'~10535feet
BKB 9396feet
Junk (measured) fill at 10535' MD (11/89)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
Length
110 20X30
2627 13 3/8
9706 9 5/8
1454 7
9861'- 9935' (Sag R.)
Size
true vertical
Tubing (size, grade, and measured depth)
Cemented Measured depth True verticalde~h
BKB
605~ 144 144
3863~ 2661 2661
1514 ~ 9740 8671
336 c.f. 9227-10681 8225-9530
Sqzd: 10076-85,10105-29
10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak)
subsea 8723'-8790' (Sag R.)
8849'-8973' (four ivishak intervals)
7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227'
Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083';
7" SSSV landing nipple at 2017'
13. Stimulation or cement squeeze summary 4/18/90 - 15% HCl perforation wash
Intervals treated (measured) as above
Treatment description including volumes used and final pressure 2000 gal. 15% HCI w/10% xylene
14.
Reoresentative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
-- 11,900 -- 2000
-- 21,400 -. 2130
16. Status of wellclassification as:
Oil Gas Suspended... Service water ~]ect~n
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~,~ ~.c,~~ Title Supervisor Waterfiood/Miscible Flood
Form 10-404 Rev 06/15/88 ~/
Date ~.!'-z.? I [~
SUBMIT IN DUPLICATE
/
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 56%5111
TO: DISTRIBUTION Date :07/26/90
T#:81437
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP (~ASED HOLE FINALS
Enclosed is your copy of the matedai listed below, if you have any questions, please contact BP
Well Records at (907) 564-ddd5.
M-13 INJ 07/11/90 #1 9350-9980 Camco 5"
M-28 INJ 07/13/90 #1 8650-8950 Camco 5"
R-06 INJ 07/11/90 #1 9800-10070 Camco 5"
R-07 INJ 07/11/90 #1 9680-9970 Camco 5"
S-21 PROD-F 07/16/90 #1 9880-10350 Camco 5"
X-24 FM 07/13/90 #1 9100-9490 Camco 5"
Z-22 GR/CCL 07/16/90 #1 13500-14091 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
AR'ClOVES
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
Re. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
March 29, 1990
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well R-06i (32-32-12-13) PBU
Enclosed, in duplicate, is form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of pulling tubing and perforating the well.
Yours very truly,
Workover/Completions Supervisor
RVS/KTH
Enclosures (2)
cc: J. Martin (MB 9-4)
Prudhoe Production Engineers
B. Wilks (MB 5-3)
Well Records w/9-
Well File
STATE OF ALASKA
, 5KA OIL AND GAS CONSERVATION COMMI3oION
REPORT OF SUNDRY WELL
1. Operations performed: Operation shutdown Stimulate Plugging Perforate
Puli tubing X Alter casing Repair well Other
2. Name of Operator
BP Exploration
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729' NSL, 1400'EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1894' SNL, 1375' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
12. Present well condition summary
Total depth:
Effective depth:
5. Type of Well:
Development
Exploratory
Stratigraphic
Service X
6. Datum elevation (DF or KB)
KBE = 55.09 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-06i (32-32-12-13) PBU
9. Permit number/approval number
79-52/9-812
10. APl number
50- 029-20388
11. Field/Pool
Prudhoe Bay Field/Oil Pool
measured
true vertical
measured
true vertical
10688 feet Plugs (measured)
BKB 9537 feet
10134 feet Junk (measured)
BKB 9026 feet
Fill at 10134' (06/88)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth True vertical depth
.. BKB
110' 20" x 30" 605 cu ft 144 144
2627' 13-3/8" 3863 cu ft 2661' 2661'
9706' 9-5/8" 1514 cu ft 9740' 8671'
Tubing (size, grade, and measured depth)
..
1454' 7" 336 cu ft 9227'- 10681' 8225'-9530'
measured 9861'-9935', 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136'(open intervals)
10076'-10085', 10105'-10129' (Isqueezed intervals)
true vertical (subsea) 8723'-8909', 8926'-8945', 8966'-8972' (five open intervals) 8918'-8926', 8966'-8973' (two squeezed intervals)
7" 26~ IJ4S to 9085 w/x-overto 5-1/2" L-80 w/4-1/2" tailpipe to 10084'
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
9-5/8" Packer@9137', 7" Otis WD Packer @ 10073', SSSV@ 2019_'_.
APR - z, 1990
Alaska 0ii & 6as Cons. C,0m~tss~0~'~
An~hnr~_~e
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation
Subsequent to operation
18861 198 psig
12078 164 psig'
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations X
16. Status of well classification as:
Oil Gas Suspended
Service Water In. iecton
17. I hereby certify that the foregoin, g, is,t~ue and co,,r, rect to the best of my knowledge. .
Signed ~~.~ Title CompletionEngineerin~Supervisor
Form 10-404 Rev 06/'1~/88 -----
SUBMIT IN DUPLICATE
ATTACHMENT I
R-06i WORKOVER PROCEDURE
Outline Procedure'
1. MIRU workover rig. Accepted rig 1400 hrs. 10-27-87.
2. Pulled BPV.
3. Circulated diesel from well.
4. Installed 2-way check valve.
5. ND tree. NU & tested BOP's to 5000 psi.
6. Pulled 4-1/2" tubing. RIH to recover packer. Repaired pipe
skate.
7. Set storm packer. Replaced the 9-5/8" packer. Recovered storm
packer. RIH.
8. Milled and recovered the 9-5/8" BOT packer and tailpipe
assembly.
9. RIH 6" bit. Tested 9-5/8" casing and 7" liner lap to 3000 psi -
ok.
10. Cleaned out cement to 10,150'.-
1 1. Tested cement squeeze to 1000 psi -ok.
12. Clean out to 10630' PBTD. Circulated. POH.
13. RIH 9-5/8" casing scraper to 9217'. Reverse circulated.
14. RIH with 7" casing scraper to 10185'. Reverse circulated.
15. Changed over to clean brine.
16. RU shooting flange and perforated the well with 5" casing guns
from 9861'-9935'.
17. RIH with 9-5/8" RTTS and frac well. POH 5" DP.
18. RIH with 6" bit and clean out bridge plug to 10597'. Reverse
circulated. Changed over to clean brine.
19. Ran 8.5" and 6" gauge rings.
20. RIH with WD packer and set at 10070'.
21. RIH with 7" tubing with 5-1/2" tail pipe.
22. Set 2-way check valve.
23. ND BOP's. NU and test 6"-5M tree to 5000 psi.
24. Pull 2-way check valve. Set plug in the tailpipe.
25. Set 9-5/8" permanent packer. Tested tubing X casing annulus
to 2500 psi.
26. Shifted sleeve open.
27. Displaced annulus to 130 bbls diesel & U-tubed diesel to
tubing.
Closed sleeve and tested for closure.
Set BPV. Released rig @ 1600 hrs. 11-08-89.
28.
29.
RECEIVED
APR - 6 1990
Alaska Oil & Gas Cons. Comt~lssl.~
Anchorag~
Rig: DOYoN I6
WelI: R-6i (32-32-12_13)
Current Operation:
Daily Drilling Report
October 30, 1989 at 0600 hfs
APE # 160509
(Expense) AF~ Amount:
AF~ # 125027
(Capital) AF~ Amount:
"PBU .. Workover
. Current Amount:
0600 Depth: 0 Day: 3
Repairing pipe skate.
Accepted rig 1400 hrs. I0-27-89. Pull BPV. Circulate dieseI from well. ND tree. NU
and test BOp to 5000 psi. PuII tubing. ~ to recover packer. Repair pipe skate.
Wells Shut-in for DriLl-By:
RECEIVED
APR - 4 1990
.Oil & Gas Oona. ¢ommi~io[~
;AnchOrage
BP EXPLORN'iON
Daily Drilling Report -- PBU -- Workover
October 31, 1989 at 0600 hrs
Rig: DOYON 16
Well: R-6i (32-32-12-13)
AFE # 160509
(Expense)
AFE # 125027
(Capital)
APE Amount:
AFE Amount:
Current Amount:
0600 Depth: 0
Day: 4
Current Operation:
Reverse out brine. Engaged fish; released latch. POH recovered seal assembly. Set storm
packer and replace 9-5/8" primary and secondary packoff. NU and test spool and BOP.
Recover storm packer. RIH.
Wells Shut-In for Drill-By:
BP EXPLORN'ION
Daily Drilling Report-- PBU-- Workover
November 1, 1989 at 0600 hrs
Rig: DOYON 16
Well: R-6i (32-32-12-13)
AFE # 160509
(Expense)
AFE # 125027
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 0
Day: 5
Current Operation:
Mill and recovered 9-5/8" packer. Laid down 6-1/4" dr/il collars.
' Wells Shut-In for Drill-By:
BP EX]~ORJqlON
Daily Drilling Report-- PBU-- Workover
November 2, 1989 at 0600 hrs
Rig: DOYON 16
Well: R-6i (32-32-12-13)
AFE # 160509
(Expense)
AFE # 125027
(Capital)
AFE Amount:
Current Amount:
0600 Depth: 10630'
Day: 6
Current Operation: POH.
RIt-t 6" bit. Tested 9-5/8"casing and 7" liner lap to 3000 psi. - OK. Cleaned out to 10150'.
Tested squeezed perforations to 1000 psi. - OK. Cleaned out to 10630' PBTD. Circulate.
POH.
Wells Shut-In for Drill-By:
BP EXFI.0~JmON
Daily Drilling Report -- PBU -- Workover
November 3, 1989 at 0600 hrs
Rig: DOYON 16
Well: R-fi (32-32-12-13)
AFE # 160509
(Expense)
AFE # 125027
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 10630'
Day: 7
Current Operation:
Change over to clean brine.
Polish fie-back receptacle. Run 9-5/8" scraper to 7" liner top 9217'. Reverse circulate.
Ran 6" bit and 7" scraper to 10185'. Change over to filtered brine.
Wells Shut-In for Dr/il-By:
BP EX]q. ORAJ'~N
Daily Drilling Report -- PBU -- Workover
November 6, 1989 at 0600 hrs
Rig: DOYON 16
Well: R-6i (32-32-12-13)
AFE # 160509
(Expense)
AFE # 125027
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 10597'
Day: 10
Current Operation:
Reverse circulating.
Perforated the well 9861' to 9935'. RIH 9-5/8" RT'rS to 9174'. Fmc well. POH 5" DP.
RIH clean out sand and bridge plug to 10547'. Reverse circulate.
Wells Shut-In for Drill-By:
BP EXPLOR~N
Daily Drilling Report -- PBU -- Workover
November 7, 1989 at 0600 hrs
Rig: DOYON 16
Well: R-6i (32-32-12-13)
AFE# 160509
(Expense)
AFE # 125027
(Capital)
AFE Amount:
AFE Amount:
Cuxrent Amount:
0600 Depth: 12597'
Day: 11
Current Operation:
Running tubing.
Change over to clean brine. Ran 8.5" and 6" gauge rings. Ran and set WD packer at
10070'. Running 7" robing.
Wells Shut-In for Drill-By:
BP EXFt. OR~N
Daily Drilling Report -- PBU -- Workover
November 8, 1989 at 0600 hrs
Rig: DOYON 16
Well: R-6i (32-32-12-13)
AFE # 160509
(Expense)
AFE # 125027
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 12597'
Day: 12
Current Operation:
Set plug in tailpipe.
Ran 7" robing. Install 2 way check. ND stack. NU and test tree to 5000 psi. - OK. Set
plug in tailpipe.
Wells Shut-In for Drill-By:
Daily Drilling Report -- PBU -- Workover
November 9, 1989 at 0600 hrs
Rig: DOYON 16
Well: R-6i (32-32-12-13)
AFE # 160509
(Expense)
AFE # 125027
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 10597'
Day: 13
Ctm'ent Operation:
Rig released.
Set packer. Open sliding sleeve and freeze protect with 130 bbl diesel. Close sliding
sleeve. Set BPV. Release rig 1600 hrs. 11-08-89.
Wells Shut-In for Drill-By:
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To: Distribution Date: 12/19/89
Transmittal: 80705
From: Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
C-27 Leak Det 11/30/89 #1 Surf-ill37 Camco
J-12 FM/Temp 11/29/89 #1 9550-9950 Camco 5"
~-29 Inj 12/03/89 #1 9450-9900 Camco
R-06i Inj 11/28/89 #1 9750-10527 Camco 5'
S-13 Prod-F 12/02/89 #1 10750-11228 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To:
Distribution
Date: 11/28/89
Transmittal: 80626
From:
Subject:
Information Control
Well Records LR2-1
BP CASED HOLE FINAL LOGS
-.
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
K-14 PROD-F 11/20/89 #1 9900-10250 Sch
F-22 TDT-P 11/17/89 #1 9250-9854 Sch 5"
F-22 TEMP & PRES 11/17/89 #1 9310-9834 Sch
R-6i COMPLETION 11/18/89 91 9046-10501 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To: Distribution
Date: 11/10/89
Transmittal: 80584
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
R-6 CCL
11/06/89 ~1 9812-10066 Atlas 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
ARCHIVES
I
RECEIVED
~ov ~ z 1989
Alaska 0il & Gas Cons. Commissiof~
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
I:~. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To: Distribution
Date: 11/07/89
Transmittal: 80569
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
.
questions, please contact BP Well Records at (907) 564-4445.
~ B-15
~ B-16
'~ F-17
~ ~-06
~ X-07
CNL - GR ~ 11/02/89 91 9644-9646 Atlas 5~
CNL - GR~' 11/01/89 91 9500-10315 Atlas 5"
PFC 11/01/89 ~1 11008-11296 Atlas
CCL 11/03/89 91 9750-10050 Atlas 5'
CCL 11/04/89 8t -~-10730-11056 Atlas
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
ARCHIVES
RECEIVED
NOV !
~ Oil & ~ Co~ C.~i~
BP EXPLORATION
8F' E×ploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
September 6, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, Alaska 99501
Attention' Mr. C. V. Chatterton
We!l,, R-06i (32-32-12-13) PBU
Gentlemen'
Enclosed, in triplicate, is form 10-403, Application for Sundry
Approvals, for the above-named well. This information
contains our proposal to pull tubing and perforate the well.
Yours very truly,
R. V. Schock
Workover/Completions
Supervisor
RVS/KTH
Enclosures
CC:
J. Martin (MB 9-4)
Floyd Hernandez
Well File
STATE OF ALASKA
AL~dKA OIL AND GAS CONSERVATION COMMISb,,.)N
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well __
Alter casing __ Repair well__ Plugging __ Time extension __ Stimulate __
Change approved program__ Pull tubing X Variance__ Perforate X Other__
2. Name of Operator
BP Exploration
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1894' SNL, 1375' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
5. Type of Well:
Development __
Exploratory __
Stratigraphic__
Service X
6. Datum elevation (DF or KB)
KBE = 55.09 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-06i (32-32-12-13) PBU
9. Permit number
79 -52
10. APl number
50- 029-20388
11. Field/Pool
Prudhoe Bay Field/Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
10688 feet
BKB 9537 feet
Plugs (measured)
Effective depth: measured 10134 feet
true vertical BKB 9026 feet
Junk (measured) Fill at 10134' (06/88)
Casing Length Size
Structural --
Conductor 110' 20" x 30"
Surface 2627' 13-3/8"
Intermediate 9706' 9-5/8"
Production --
Liner 1454' 7"
Perforation depth: measured 9861'-9903'(Sag R.)
Cemented
Measured depth
144
2661'
9740'
605 cu ft
3863 cu fl
1514 cu fl
336 cu ft 9227'-10681'
10000~10028~ 10038~10066~ 10076L10136'dvbhak)
true vertical (subsea) 8723'-8761'(Sag R.)
8849'-8972' (three lvishak intervals)
Tubing (size, grade, and measured depth) 4-1/2"L-80 to 9180' with 3-1/2" tailpipe to 9293'
Packers and SSSV (type and measured depth) 9-5/8" BOTpacker at 9180'; no SSSV
True vertical depth
BKB
144
2661'
8671'
8225'-953O'
RECEIVED
SEPI I
Alaska Oil & 6as Cons, 0 tiss[0[.
Anchorage
13. Attachments
Description summary of proposal X Detailed operations program
BOP sketch X
14. Estimated date for commencing operation
3rd Quarter 1989
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil Gas
Service Water In/ecton
Suspended .__
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~-~ ~ ¢--~ (.~-,,t"' Title Completion Engineering Supervisor
FOR COMMISSION USE ONLY
Date 7-'/-~"~'
Conditions of approval: Notify Commission so representative may witness
Plug i nteg rity BC~P ~'est Location clearance
Mechanical Integrity Test~ Subseq.~at form required 10- ~
Approved by order of the Commission ORIGINAL SIGNED BY
Form 10-403 Rev 06/15/88 L._./ LONNIE O. SMITH
IAppr°val N°'
Approvea Copy
Returned
Commissioner Date
SUBMIT IN TRIPLICATE
ATTACHMENT I
R-06i WORKOVER PROCEDURE
Procedure Outline:
I ,
2.
3.
4.
5.
6.
7.
8.
,
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
Perform Pre rig workover CTU squeeze.
MIRU workover rig.
Pull BPV.
Circulate diesel from well.
Install 2-way check valve.
ND tree. NU & test BOP's to 5000 psi.
Pull 4-1/2" tubing.
Install storm packer. Replace and test the 9-5/8" pack-
off. Recover storm packer.
Recover PBR.
Mill and recover the 9-5/8" BOT packer and tailpipe assembly.
RIH 6" bit. Test 9-5/8" casing & 7" liner lap to 3000 psi.
Clean out cement to 10,150'.
Test cement squeeze to 1000 psi.
If squeeze fails to test, RIH with test packer and locate leak. A
re-squeeze may be necessary.
Clean out to 10630'
RIH 9-5/8" casing scraper to 9227'. Reverse circulate.
RIH with 7" casing scraper to 10134'. Reverse circulate.
Change over to clean brine.
RIH an set bridge plug at 9980'
RU shooting flange and perforate the well with 5" casing guns
and perforate 9861 '-9935'
RIH with test packer and frac well.
RIH with 6"bit and clean out bridge plug
RIH 8.5" gauge ring/junk basket to 9227'.
RIH with 6" gauge ring/junk basket to 10100
RIH with WD packer and set at 10070
RIH with 7" tubing with 5-1/2" tail pipe
Set 2-way check valve.
ND BOP's. NU and test 6"-5M tree to 5000 psi.
Pull 2-way check valve. Set plug in the tailpipe.
Set 9-5/8" permanent packer. Test tubing X casing annulus to
2500 psi.
Shift sleeve open.
Displace annulus to 135 bbls diesel & U-tube diesel to tubing.
Close sleeve and test for closure.
Set BPV. Release rig.
RECEIVED
scP 1 1989 '
,/~,.iaska 0ii & Gas Cons. C0mmissi0.~,
Ar~ch0rage
B.O.P. STACK CONFIGURATION
13-5/8 IN. TRIPLE RAM STACK
SO00 PSI WP
ATTACHMENT II
DRILLING
ANNULAR
PREVENTER
I I.
I ]
! I
PIPE RAMS
i I
I
1 I
PIPE RAMS
L
,]
2 IN. KILL LINE
.
GATE
DRILLING
SPOOL
I
4 IN. CHOKE LINE
GATE GATE
)RECEiVEG.
s~.~ 1 ~ 1989
Anchorage
! 1
BLIND RAMS
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
TO: MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
REFERENCE:
BP'CASED HOLE FINAL LOGS
~xplora.on (Ala=ka) Inc.
f~00 East Benson Boulevard
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
Date:
04-28-89
80020
The following material is being submiT'J'ed herewith. Please acknowledge receipt by
signing a copy of this lett'er and returning It to this office:
R-06i LEAK DETECTION/TEMP 04-21-89
W-21 GUN POSITION RECORD 04-21-89
W-21 CET 04-20-89
W-21 CNL 04-20-89
Z-01 PITS 04-22-89
#1 3500-9230 Sch 2"/5"
#1 9498-9798 Sch 5"
#1 9514-11376 Sch 5"
#1 9513-11333 Sch 5"
#1 10450-10800.Sch 5"
Rece i ved
Date
Shirley R. McCurry
~ NFORMAY ~ ON CONTROL
Wel I Records LR2-1
BP E~PLORATION
EOT. TSTON
ARCO
CEE,~rEO~
'~E.YACO
· TO:
MOBTL
AIt~S
REFERENCE:
BP F~AL DATA - PRESSURE S~R~EY DATA
I NOEXED
BP Exploration (Alaska) Inc.
gO0 East Sanson Boulevara
PO. Box 196612
Anchoracj~ Alaska 99519-6612
(907) 561-5tll
Date: 02/24/89
79843
The roi lowing material Is being submit-ted herewith. Please acknowledge receipf by
signing a copy of this .let-let and refurning If to fhls office:
C-07 Static Gradient 02/I 0/89 Camco
R-06 - Static Gradient 02/02/89 Camco
X- 17 Static Gradient 02/08/89 Camco
Y- 01 Flowing Gradient 01 / 31 / 89 Camco
Gas Cons. Commission
Ancbor:~ge
Rece I ved
Jennifer Dietz
I NFORMAT i ON CONTROL
We l I Records LR2-1
Standard Alaska
Production Company
900 East Benson Boulevarc~
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
August 29, 1988
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well R-6 (32-32-12-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
Yours very truly,
BJP:JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
R-6 Well File
B. J. Po-/liCky, S~rvisor
Waterflood & Miscible Flood
RECEIVED
AUG '} t t,q.' ~: ij
Oil & Gas Cons. gommission
A unit of the original Standard C~I Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
· Operation performed: Operation shutdown [] Stimulate [] Plugging []
Alter casing [] Other []
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1894' SNI_, 1375' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNI_, 1166' WEL, SEC. 32, T12N, R13E, UPM
1. Present well condition summary
Total depth: measured 10688 feet
true vertical BKB 9537feet
Effective depth: measured 10134 feet
true vertical BKB 9026 feet
Casing Length Size
Structural --
Conductor 110 20X30
S u trace 2627 13 3/8
I nte rmed i ate 9706 9 5/8
Production --
Liner 1454 7
Plugs (measured)
Junk (measured)
Perforate [] Pull tubing []
5. Datum elevation (DF or KB)
KBD-- 55.09 AMSL feet
S. Unit or Property name
Prudhoe Bay Unit
7. Well number
R-06 (32-32-12-13) PBU
8. Approval number
8-123
9. APl number
5 0 - 029-20388
0. Pool
Prudhoe Oil Pool
fill at 10134' (06/88)
Cemented Measured depth True Vertical depth
BKB
605 cof. 144 144
3863 c.f. 2661 2661
1514 c.f. 9740 8671
336 c.f. 9227-10681 8225-9530
Perforation depth: measured 9861'- 9903' (Sag R.)
10000'-10028', 10038'-10066', 10076'- 10136' (Ivishak)
true vertical subsea 8723'-8761' (Sag R.)
8849'-8972' (three Ivishak intervals)
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9180' with 3 1/2" tailpipe to 9293'
Packers and SSSV (type and measured depth)
9 5/8" BOTpacker at 9180'; no SSSV
RECEIVED
2. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
AUG ) 1 1988
/daska Oil & Gas Cons. CommissiQn
Anchorage
·
Prior to well operation
Subsequent to operation
Reoresentative Daily Averaae Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
.... 14000 --
.... 14400 --
Tubing Pressure
1750
1865
4. Attachments
Daily Report of Well Operations []
Copies of Logs and Surveys Run []
5. I hereby certify that the foregoing is true and correct to the best of my knowledge
orm 10-404 Rev. 1"2-'[-85- ~
D ate ~j--//~
Subrn~ in Duplicate
The following Sag River interval was :perforated .~unc 20, 1988, using. Schlurnbcrgcr
3 3/8" HyPerdome carrier guns at 4 spf:
9861'. 9903' MD BKB (872Y. 8761' TVDss) Ref. BHCS, 9/27/79
A lubricator was installed and tested to 3500 psi for al/ well work. The well was
returned to injection immediately following perforating operations, then tested.
jill
8/17/88
RECEIVED
AUG 3 I 19~8
_Alaska Oil A Gas Cons. Commission
Anchorage
Slar~da~,d Alas1, a
Production Comp
900 Eo'.~ ~n..On Boule.,o,d
P O I~o~, 19661~
Ancho,oge. Aloe. ko 99519-661 ~
19071 564-51 II
DALLAS
ARCO
CHEVRON
E,~-KON
TEXACO
TO: MO B IL
REFERENCE:
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
SAPC CASED HOLE FINAL LOGS
I NOEXED
STANDARD
ALASKa. PRODUCTION
07/07/88
Date:
79062
The following material Is being submitted herewith. Please acknowledge recelpt by
signing a copy of this letter and returning It to this office:
,
A
-02
~ B-09
E-18
~H-21
R-06
U-13
Spinner 06/25/88 #1 11150-11490 Sch 5"
CET 06/23/88 #1 8700-10086 Sch
Completion Record 06/21/88 #2 9710-11160 Sch 5"
CNL 06/26/88 #1 9100-9898 Sch 5"
Leak Det/Temp 06/29/88 ~1 8600-9370 Sch 5"
Production Log 06/28/88 #1 11050-11458 Sch 5"
Re. ce I veal
Date
A un, I OI the O,,g,,"'-oI 51ondo~,d C~l Comp, any
Founded .,-~ Cl¢-¢lo-d Oh,o .n
Jennifer Dietz
I NFORY~T I ON CONIRO[
Wel I Records hR2-1
Production Compa,
(J~0 EO$! ~nson Boules, oral
P.O. Bo~ I~!~
(907! 5~4-~ i I i
ARCO
-CHEVRON
EXXON
TEXACO
TO: MOBIL
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
RESERVOIR
REFERENCE: ARCHIVES
SAPC CASED HOLE FINAL LOGS
INDEXED
STANDARD
ALASKA PRODUCTION
Date: 06/30/88
TI: 79037
The following material Is being submitted herewith. Please acknowledge receipt by
signlng a copy of this lette~ and returning It to this office:
A-23
B-20
C-03
R-06
,.
CCL 06/18/88
Completion Record
Completion Record
CCL/Perf Record
06/18/88
06/15/88
#1
10396-10604 Sch 5"
~1 9490-9870 Sch 5"
~1 9638-10132 Sch 5".
9695-10010 Sch 5"
Rece i ved
Date
Jennifer Dietz
NFORMAI ~ ON CONTROC
Wel I Recocds LR2-1
the oz;~g;nol ~.lom:lo,d O;I Compony
in Cle~.eland. CY~;o. ;n 1870.
S~ondard
Production Company
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99,519-6612
(907) 561-5111
ALASKA PRODUCTION
June 22, 19 88
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well R-6 (32-32-12-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to stimulate the well.
Yours very truly,
JAB:JAM~
Enclosures (9)
cc: J. L. Haas (MB12-1)
R-6 Well File
a~ g roouction Engineering
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
I1. Type of Request: Abandon [] Suspend [] Operation Shutdown []
Time extension [] Change approved program [] Plugging [] Stimulate []
2. Name of Operator
Re-enter suspended well [] Alter casing []
Pull tubing [] Amend order [] Perforate []
Other []
Standard Alaska Production Company
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729'NSL, 1400'EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1875' SNL, 1190' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
5. Datum elevation (DF or KB)
KBD = 55.09 AMSL feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
R-06 (32-32-12-13) PBU
8. Permit number
79-52
9. APl number
5 0 - 029-20388
10. Pool
Prudhoe Oil Pool
1. Present well condition summary
Total depth: measured
true vertical
Effective depth:
measured
true vertical
Casing Length
Structural --
Conductor 110
Surface 2627
Intermediate 9706
Production --
Liner 1454
Perforation depth: measured
10688 feet
BKB 9537 feet
10354 feet
BKB 9228 feet
Size
Plugs (measured)
Junk (measured)
FILL @ 10354'
20X30
13 3/8
9 5/8
Cemented Measured depth True Vertical depth
BKB
605 c.f. 144 144
3863 c.f. 2661 2661
1514 c.f. 9740 8671
7 336 c.f. 9227-10681
10000'-10028', 10038'-10066', 10076'-10136'
true vertical subsea
8849'-8972' (three intervals)
4 1/2" L-80 to 9180' with 3 1/2" tailpipe to 9293'
Tubing (size, grade and measured depth)
8225-9530
Packers and SSSV (type and measured depth)
9 5/8" BO Tpacker at 9180'; no SSS V
2. Attachments Description summa~ of proposal ~ Detailed operations program
3. Estimated date for commencing operation
July 1988
4. If proposal was verbally approved
Name of approver ~'oz'm ~',~o. Dated.--/--/--
Date approved
5. I hereby certify that ~~rue and correct to the best of my knowledge
Signed _ Jx~",4~~-~.~~ Title Manager Production Engineering
~{~~' ' (J~/ Commission Use Only
Condiflq~s,6f approval Notify commission so representative may witness IApproval No.
[] Plug integrity [] BOP;Test I-I~ Location clearance
I
Approveo [Jopy
Approved by
ORIGINAL SIGNED BY
LONNIE C. SMITH
eturned~
Commissioner
by order of
the commission
Form 10-403 Rev 12-1-85
Submit in triplicate
R-6iMUD~TREATMENTP~RAM
Treatme_nt Procedure
1. Obtain a maximum rate well test.
2. Pull the SSSV.
3. Cut off the XN nipple and drop it to bottom.
4. Make a gauge run for the Nowsco straddle packer assembly which requires a
minimum ID of 2.70".
TREATMENT
1. Mix or obtain the following fluids:
a. 90 bbl 15% HCl/xylene
b. 180 bbl Mud acid
c. 180 bbl 3% NH4Cl brine
d. +50 bbl Methanol
e. +50 bbl Produced water (to initially set the packer)
Note: Filter all fluids that are to enter the perfs to 3 microns,
preferably on the fly while pumping the job.
Rig up a CTU with the Nowsco straddle packer assembly set for a 10'
straddle, a TEL, and a pump. Approximate length of the packer assembly is
27'. Circulate out any diesel in the coiled tubing. Test the packer
assembly as per Nowsco's recommended procedures. Ensure a check valve is
installed between the CTU and the pump. Attach a fusible cap to the SSV.
Pressure test to 4000 psig.
3. Shut in the well.
.
RIH with CT at a maximum of 50 fpm pumping filtered produced water as
needed to maintain CT pressure. Slow the running speed when passing
through any jewelry.
Tie-in to the tubing tail. Run in to the liner, and inflate the packers
in a blank interval to 1000 psi. Set down with 2000 lbs to verify the
set, then release the packers and allow them to deflate. Rig up a pump
van. Ensure a check valve is installed between the CTU and the pump van.
Pressure test to 4000 psi.
kg June 16, 1988
R=6i MUD ACID PROGRAM
.
Set the straddle packer across each of intervals listed below, inflating
them to 1000 psi, and pump the following treatment into each straddled
section:
a. 10 bbl 15% HCl/xylene
b. 20 bbl 12/3 Mud acid
c. 20 bbl 3% NH4Cl brine
Each stage is to be followed immediately by the next stage with no spacer
between stages. The packers are to be released from the treated section
and reset across the next section when the acid for the next section is 3
bbl awaY from exiting the coiled tubing. The final stage should be
displaced with methanol.
Note: Attempt to pump the job observing a maximum bottom hole injection
pressure of 5000 psi. If it is necessary to exceed the pressure to treat
a section do not hesitate to do so, but lower the pressure as soon as
possible.
Sections to be straddled and treated are as follows:
a. 10000-10010
b. 10010-10020
c. 10020-10030
d. 10035-10045
e. 10045-10055
f. 10055-10065
g. 10075-10085
h. 10085-10095
i. 10095-10105
Put well back on injection after treating this
section. Maximum injection pressure: 1000 psi.
Displace with methanol.
7. Release the packer, and POH pumping methanol as needed to maintain CT
pressure. Return the well to normal injection.
8. RD.
POST-TREATMENT
.
Run an injection profile and temperature survey 2-3 days after completing
the treatment.
kg June 16, 1988
Coiled Tubing Blow-Out-Preventers
Coiled Tubing
Pack-Off
Blind Rams
Cutter Rams
2" Chicksan (Kill Line)
Slips
~ 'J~ Pipe Rams
Pump-In Sub
(Circula te/R e turns )
W ell Head
Swab Valve
Standard Alaska
Production Company
900 East Benson BoulevarcJ'----,~
P.O. Box 196612
Anchorage, Alaska 99519-6612
1907} 561-5111
STANDARD
ALASKA PRODUCTION
February 25, 1988
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well R-6 (32-32-12-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perforate the well.
BJP:JAM
Enclosures (9)
cc: J. L. Haas (MB12-1)
R-6 Well File
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
Yours very truly,
B. J. ~/olicky, S~pervi~or'
Waterflood & Miscible Flood
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
· Type of Request: Abandon [] Suspend [] Operation Shutdown []
Time extension [] Change approved program [] Plugging [] Stimulate []
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
729'NSL, 1400'EWL, SEC. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1875' SNI.., 1190' WEL, SEC. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM
Re-enter suspended well [] Alter casing []
Pull tubing [] Amend order [] Perforate []
5. Datum elevation (DF or KB)
Other []
KBD = 55.09 AMSL feet
8. Unit or Property name
Prudhoe Bay Unit
7. Well number
R-6 (32-32-12-13) PBU
8. Permit number
9. APl number
5 0 - 029.20388
10. Pool
Prudhoe Oil Pool
1. Present well condition summary
Total depth: measured
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
10688 feet Plugs (measured)
true vertical BKB 9537feet
measured 10354 feet Junk (measured) FILL @ 10354'
true vertical BKB 9228 feet
Length Size Cemented Measured depth
..
110 20X30 605 c.f. 144
2627 13 3/8 3863 c.f. 2661
9706 9 5/8 1514 c.f. 9740
..
measured
7 336 c.f. 9227-10681
10000'-10028', 10038'-10066', 10076'-10136'
true vertical subsea 8849'-8972'(three intervals)
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9180' with 3 1/2" tailpipe to 9293'
Packers and SSSV (type and measured depth) 9 5/8" BO T packer at 9180'; no SSS V
12. Attachments
True Vertical depth
BKB
144
2661
8671
8225-9530
RECEiYEO
F E B 2 '9 i988
Alaska Oil & Gas Cons. C0mmlssl0f~
Anchorage
Description summary of proposal [] Detailed operations program [] BOP sketch 13
3. Estimated date for commencing operation
Feb/Mar 1988
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certif~y, that th~.~,ing i.i.~true and correct to the best of my knowledge
Si~lned '~\ ~_.~~~ Title Supervisor Waterflood/Miscible Flood
Commission Use Only
Conditions of approval
Notify commission so representative may witness IApproval No.
[] Plug integrity [] BOP Test [] Location clearance
I
ORIGINAL SIGNED BY
Approved by LONNIE N R~TH
:orm 10-403 Rev 12-1-85
Approved Copy
Returned ~,,,~
Commissioner
by order of
the commission
Submit in triplicatu
~ell R-§ (32-32-12-13).PBU
. .
ADDITIONAL PERFORATING PROPOSAL
We propose to perforate the following Sag River interval for water
in~ection during February 1988 at 4 spf:
9861' - 9903' MD BKB (8723' - 8761' TVDss)
Depths are referenced to BHCS, 09/27/79
A lubricator will be installed and tested to 3500 psi for all well work.
Following perforating operations, the well will be returned to production
and tested.
NOTE: A previously approved stimulation (approval # 7-79) of this well
has been cancelled. "
0833Z
02/08/88
FLOW'TUBES
& PACKOFF
BOWEN.. PACKO FF
~ J--*- HAND
GREASE SEAL
FLOWTUBE
PUMP
FLOWLINE
GREASE LINE
F£OWLINE
VALVE
GREASE
! MANIFOLD
GREASE
PUMP
RISER
.-,~,-. GREASE
RESERVOIR
BOP
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
TO: MOBIL
PIlILLIPS
STATE OF ALASKA
GEOSC IENCES
INDEXED
STANDARD .......
ALASKA PRODUCTION
Date:
11/02/87
78287
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following materiel Is being submitted herewlfh. Please acknovledge receipt by
signing a copy of this lefte~ and returning It to this office:
C-11
J-23
N-1
R-6
U-4
U-5'
Y-lO
WOPITS 10/12/87 #1 9650-9950 Camco 5"
Temp. 10/20/87 ~1 2000-4450 CAmco 5"
Flowmeter Prod. Log 10/16/87 ~1 8650-8977 Camco 5"
Injection Profile 10/21,22/87 #1 9900-10340 Camco 5"
Injection Profile 10/17/87 #1 11300-11600 Camco 5"
InJestion Profile 10/17/87 ~1 9150-9488 Camco 5"
Flowmeter Tamp 10/19/87 ~1 9350-10000 Camco 5"
Rece i ved
A un,! O! the o~:~,nol S'¢~ndu,d OI
~ounded ,n (~le-eland· C~,o ,n 1870
Victoria Aldridge
I NFORHAT I ON CONTROL
Wel I Records LR2-1
S~ondo~d AIo~ko
Ih, oduction
900 East ~n~ ~ d
P.O. ~ 19~12
~hmoge, Alaska ~519-~ 12
DALLAS
ARCO
CHEVRON
· EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
INDEXED
STANDARD
ALASKA PRODUCTION
Oa'~: 06/05/87
Ti: 77952
REFERENCE:
SAPC CASED HOLE FINAL LOGS
IThe following material is being submit-I'ed here~ith. Please ecknowledge receipt by
signing a copy of thls lei-I'er' and returning it to this office=
B-9
B-16
C-26
F-5
F-27
H-3
J-5
J-13
J-13
J-23
J-23
N-3
N-3
N-7
R-6
S-6
Received
Date
Injection Profile
Collar Log
DFT
Production Profile
CBT
Cont. Flow Survey
Cont. Flow Survey
Borehole Audio Tracer Survey 05/
DFT 05/03/87
Borehole Audio Tracer Survey 05/
Temp. 05/05/87
DFT 05/12/87
GR. 05/12/87
Caliper 05/07/87
Injection Profile
05/20/87 al 9800-10058 camco 5"
05/19/87 al 9900-10250 Go 5"
05/11/87 al 10500-11760 Go 5"
05/17/87 al 11100-11350 camco 5"
11/06/86 al 9200-10620 Sch 5"
05/11/87 al 9850-10137 Go 5"
05/17/87 al 9950-10260 GO 5"
03/87 #1 2000-11600 GO 2"
#2 Surf-il609.5 GO 2"
05/87 al 1000-9800 GO 5"
al 39-9800 GO 2"
al 11100-11700 Go 5"
al 9100-11700 Go 5"
al 10100-10571 GO 5"
05/14-15/87 al 9900-10350 camco 5"
Cont. Flow Survey 05/10/87 #1 9950~10650 Go 5"
/ /~,i~ka Oil & GaS'eoCene. Commission .
,.. ~ --J Anchorage
k uml al the' orJgJr~l Slondo,d O~1 Company
Founded ,n Cleveland. Ghio. ,n 1870
Victoria Aldridge
I NFORMAT I ON CONTROL
Well Records LR2-1
Siorkdord Aioska
P~oclucl;on Compony
~ fo$~ ~enson Goulev
P.O. lie, 196612
Ancho~oge. Ato~ko 99519-6612
(907! ~64-5! I I
DALLAS
ARCO
INDEXED
CHEVRON -
EXXON
TEXACO Date: 02/24/87
TO: MOBIL TI: 77739
PHILLIPS
'STATE OF ALASKA
GEOSCIENCES
STANDARD
ALASKA PEODUCTION
REFERENCE:
SA_PC CASED HOLE FINAL LOGS
The following material is being submltfed herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office: -
A-16
A-17
B-12
B-12
B-19
B-19
E-7
G-23
J-6
M-2
R-2
R-6
S-14
S-20
T-7
Injection Profile 01/27/87 #1
Injection Profile 01/30/87 #1
DFT 01/28/87 #3
Cont. Flow & CCL 0D/28/87 #3
Cont.Flow 01/26/87 #1
Completion Record 02/15/87 #1
CCL/Perf. 02/01/87 -. #1
GR/CCL 02/02/87 #2
Packer Setting 02/13/87 #1
Cont. Flow/Injection Profile 01/28/87
Cont. Flow 02/06/87 #1
Injection Profile 02/9-10/87 #1
Cont. Flow 02/03/87 #1
Production Profile 02/01/87 #2
Injection Profile 01/29/87 #1
9900-11000 Camco 5"
10000-10300 Camco 5"
8850-9300 GO 5"
8850-9300 GO 5"
9350-9700 GO 5"
9200-9718 Sch 5"
9100-9432 GO 5"
8100-9203 Camco 5"
10030-11350 Sch 5"
#1 9700-10010 GO 5"
9390-9640 GO 5"
9900-10200 Camco 5"
10150-10900 GO 5"
'9150-9750 Camco 5"
9200-9550 Camco 5"
Rece i ved
Date .
A un,I ol the ~'i~nol $~ondo,d Oil Compon!,
Jounded ,. Cle,,elo~cl. Ohm. ,n 1870
Standard Alaska
Production Company/'''~
900 East Benson Bouk
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-5111
January 29, 1987
STANDARD
ALASKA PRODUCTION
Alaska 0il & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Well R-6 (32-32-12-13) PBU
Gentlemen:
Enclosed, in triplicate, is
Approvals, for the above-named
stimulate the well.
Form 10-403, Application for Sundry
well. This contains our proposal to
Yours very truly,
JAB:JAM~
Enclosures (6)
cc: J. L. Haas (MB12-1)
R-6 Well File
~upervisor Production Operations
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
' STATE OF ALASKA
ALAS*"'""OIL AND GAS CONSERVATION COMI'-'SION
APPLICA! ION FOR SUNDRY APPROVALS
1. Type of Request: Abandon :- Suspend -- Operation Shutdown - Re-enter suspended well - Alter casing ~_
Time extension ~ Change approved program Z Plugging ~ Stimulate _~ Pull tubing -- Amend order -- Perforate ~ Other
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1854' SNL, 1188' WEL, Sec. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, Sec. 32, T12N, R13E, UPM
5. Datum elevation (DF or KB)
KBE = 55.09
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
R-6 (32-32-12-13) PBU
8. Permit number
79-52
9. APl number
50--029-20388
10. Pool
Prudhoe Oil Pool
feet
11. Present well condition summary
Total depth: measured
true vertical
10688 feet
9537 feet BKB
Plugs (measured)
Effective depth: measured
true vertical
10630 feet Junk (measured)
9483 feet BKB
Casing Length
Structural
Conductor. 89 '
Surface 2640 '
Intermediate 9719 '
Production --
Liner
Perforation depth:
Size Cemented
20"×30" 605 c.f·
13 3/8" ' 3863 c.f.
9 5/8" 1514 c.f.
1454' 7" 336 c.f.
measured
10000' - 10136' (three intervals)
true vertical (subsea)
8849' - 8972'
~bing(size, grade and measured depth)
4 1/2" L-80 to 9180' with 3 1/2" tailpipe to 9293'
Packers and SSSV(type and measured depth)
9 5/8" BOT packer at 9180'; no SSSV
Measured depth
110'
2661'
9740'
9227'-10681'
True Vertical depth
BKB
110'
2661'
8671'
8225'-9530'
12.Attachments
Description summary of proposal ~ Detailed operations program '~ BOP sketch
13. Estimated date for commencing operation
February/March 1987
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Si~ ~/~,/1~ Title Supervisor Production Operations Date /' Z~. ~7
UJ. A. Bragg ~
Commission Use Only
Conditions of approval Notify commission so representative may witness
~_ Plug integrity ~'~- BOP Test [] Location clearance
Approved by
Commissioner
Approval No.7 _ 7 ¢
by order of
the commission Date
Form 10-403 Rev 12-1-85 Submit in triplicate
Well R-6i (32-32-12-13) PBU
STIMULATION PROPOSAL
A bullheaded diesel/15% HC1 acid wash to treat iron sulfide sludge
material in the wellbore is proposed for water injection well R-6
as follows:
a.
25 bbls. diesel preflush w/10% mutual solvent
2000 gal. 15% HC1 w/additives
25 bbls. diesel w/10% mutual solvent
2000 gal. 15% HC1 w/additives
173 bbls. produced water, displacing to perforations
Following the treatment the well will be returned to injection and
tested.
jm
1/28/87
Standard Alasl~a
P~oduclion Company
900 Eosl Benson Boulevc
P.O. Box 19661?
Anchmoge, Alaska 99519-6612
(907) 564-511 I
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
Date: 12/03/86
TEF~CO ,.
TO: MOBIL TI: 77563
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
STANDARD
ALASKA PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of thls letter and returning It to this office:
-~--B-6 Perf. Record 07/08/86 #1 8446-9335 ~Sch 5"
-~-~.D-19 EPL 04/25/86 #1 9000-9400 Sch 5"
'"--M-14 EPL 04/28/86 #2 10200-10727 Sch 5"
'~--M-14 EPL 04/11/86 #2 10100-10900 Sch 5"
~N-2 Multi-finger Caliper 07/02/86 #1 9266-10461 Sch 5"
N-7 Perf. Record 07/06/86 #1 9440-10554 Sch 5"
'R-6 EPL 04/22/86 #1 9700-10400 Sch 5"
~ -~S-16 Perf. Depth Control 07/04/86 #1 10674-11228 Sch 5"
~ S-16 _ Perf. Record 07/15/86 #1 10300-11235 Sch 5"
--- X-14 EPL 04/11/86 #2 11490-11567 Sch 5"
Gas Cons. ~rnmissi0n
Anchorage
Race i ved
Date
A unil of Ihe o,g;nol Sk,,,do~d C)d Co,npony
Founded m Cle-elond. O+,,n. ,n 1870
Vic toria Aldridge
INFORMATION CONTROL
Well Records LR2-1
SOHIO ALASKA PETROLEUM COMPANY
February 21, 1986
900 EAST BENSON BOULEVARD
ANCHORAGE. ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: 'Mr. C. V. Chatterton
PBU Wells N-9, N-10, R-3, R-6, and S-2
Gentlemen:
Enclosed, in duplicate, is Form 10-403, Sundry Notices and
Reports on Wells, for each of the above-named wells. These
contain our subsequent report to stimulating these wells.
Yours very truly,
JAB: JAM ~
/~.~A. Brag~ ~~
k~Supervisor Production Operations
Enclosures
cc: Drilling Well Files (MB12-1)
Well Records (LR2-1)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
;2. Name of Operator
SOHIO ALASKA PETROLEUM COMPANY
COMPLETED WELL 12]
OTHER []
3. Address
P. O. BOX 196612, Anchorage, Alaska
4. Location of Well
At surface:
729' NSL, 1400' EWL, Sec.
5. Elevation in feet {indicate KB, DF, etc.)
KBE = 55.09' AMSL
12.
99519-6612
32, T12N, R13E, UPM
7. Permit No.
79-52
8. APl Number
50-029-20388
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13) PBU
11. Field and Pool
Prudhoe Bay
I 6. Lease Designation and Serial No. Prudhoe Oil Pool
ADL 28279
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing r'] Perforations [] Altering Casing I-1
Stimulate [] Abandon I'-] Stimulation ~ Abandonment []
Repair Well [] Change Plans [-] Repairs Made [] Other []
Pull Tubing [] Other [-I Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10407 for each completion.)
13. Describe Proposed or Completed O~rations (Clearly state all pertinent details and give ~rtinent dates, including estimated date of starting any
proposedwork, forAbandonmentsee20AAC25.105-170). A multi-stage bullheaded mud acid treatment was
performed on February 8, 1986 on the following perforated intervals. This treatment was
preceded by a coiled tubing breakdown mud acid treatment on February 4, 1986.
·
10000' - 10028' BKB
10038' - 10066' BKB
10076' - 10136' BKB
The initial breakdown treatment consisted of 500 gal. xylene, 1250 gal. 15% HCl w/5% EGMBE
mutual solvent, 2500 gal. 12%' HC1 - 3~ HF, 700 gal. 15% HCl, 1000 gal. ammonium chloride,
and 70 bbls. 50/50 methanol/water,
The bullheaded mud acid'treatment consisted of 1700 gal. gelled 3% ammonium chloride w/700
lbs.'benzoic acid flakes,'4000 gal. 15%. HCl:~w/5%'mut~al solvent, 7200 gal. 12% HC1 - 3% I~
2000-gal. 15% ~Cl, 200Ogal;· gelled'3%'ammonium chloride-W/000 lbs. benzoic acid flakes.
700 gal. methanol.was pumpea'~to-dissolve the':benzoic acid flakes and injection brine'was
flushed to the perforations
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
·
he sp~/below for Commission use ' ~J/- A. Bragg
Condi ~t~ns of Approval. if any:
Approved by.
By Order of
COMMISSIONER the Commission
DaTe
Form 10-403
Rev. 7-1-80
Submit "lnlentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
February 11, 1986
Alaska Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well R-6 (32-32-12-13) PBU
Gentlemen:
·
Enclosed, in duplicate, are the following forms for the above-
named well.
1. Form 10-407, Completion Report,
2. Form 10-.403, Sundry Notice and Report on Wells,
3. Form 10-404, Monthly Report of Drilling and Workovers.
Yours very truly,
S. L. Bryan.t
Supervisor Reservoir/Production
Surveillance Unit
PFB:JAM~
Enclosures
cc: Drilling Well Files (MB12-1)
Well Records (LR2-1)
R-6 Well File
r --~, STATE Of ALASKA
ALASKA;t3 AND GAS CONSERVATION CO,- ISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE ~ Water Tnject±ort
,
2. Name of Operator 7. Permit Number
SOHIO ALASKA PETROLEUM COMPANY 79-52
3. Address 8. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 50~D29-20388
4. Location of well at surface 9. Unit or Lease Name
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
1904' SNL, 1422' WEL, Sec. 32, T12N, R13E, UPM R-6 (32-32-12-13) PBU
At Total Depth 11. Field and Pool
1848' SNL, 1166' WEL, Sec. 32~ T12N, R13E, g.PM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) ] 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 55.09' AMSL~ ADL 28279
12. DateSpudded 13. DateT.D. Reached 14. DateComp.,Susp. orAband. 115. WaterDepth, ifoffshore 116. N0. of Completions
9/11/79 9/27/79 1/28/80IIfeet MS L one
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
10688'MD 9537'TVD 10630'MD 9483' TvI)YES[~ NO[]I 1992 feetMD 2006'
22. Type Electric or Other Logs Run
DIL/SP/GR, BHCS/GR/FDC/CNL/GR/Cal, Sidewall cores
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLESlZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulate~.Conducto~ Surface 110' 136" 605 cu. ft. Arcticset
.13 3/8" 72# L-80 Surface 2661' 17 1/2" 3863 cu.ft. Permafros.t
9 5/8" 47~ L-80 Surface 9740' 12 1/4" 1384 cu.ft. ClassG;12.0 cu.ft. Permafrc
7" 29.~ L-80 9227' 10681' 8 1/2" 336 cu.ft. Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) MD TVDss SIZE DEPTH SET (MD) PACKER SET (MD)
Prudhoe Oil Pool Top: 10000 ' 8849 ' 4 1./2" 9293 ' 9180 '
Bottom: 10136 ' 8972 '
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
10000' - 10028' BKB (8849 ' - 8874' TVDss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10038' - 10066' BKB (8883' - 8908' TVDss)
10076' - 10136' BKB (8918' - 8972' TVDss)
27. PRODUCTION TEST
Date First Production i Method of Operation (Flowing, gas lift, etc.)
....
Date of Test Hours Tested PRODUCTION FOR OIL-BB'L GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD I~
Flow Tubing Casing Pressure CALCULATED ,~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (~orr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEi\,'ED
~t
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
.
· : G: (~:i(~ MAi~K-~Rs' .... 'FOR~IATION:TE-' 'ST ' '
EOLO : ~' ' ":' ' .... ::' ........ ' ' ': ' .......
' " "' : .~ ~ -' ~ : ': S: '
·
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT, DEPTH GOR, and time of each phase.
BKB Subsea
Sag R. SST. 9848' 8711'
Shublik 9905' 8762 '
Ivishak 9995 ' 8844 '
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~S~L ~2~ ant~~ Title Supervisor, Res '/Date
. . Brv Prod. Surveillance II
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in~situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10~,07
STATE OF ALASKA '-"
ALASKA O,,_ AND GAS CONSERVATION COi,.,vllSSION
SUNDRY NOTICES AND REPORTS ON WELLS
DRILLING WELL []
COMPLETED WELL []
OTHER
I1.
2. NameofOperator 7. PermitNo.
SOHIO ALASKA PETROLEUM COMPANY 79-52
3. Address 8. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20388
4. Location of Well
At surface:
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
_~C!~_E = 55.09' i~_MSL
6. Lease Designation and Serial No.
ADL 28279
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
PBU
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations ~r] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Aba ndonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following additional water injection interval was perforated January 27, 1986,
using Schlumberger 2 1/8" Hyperdome guns at 4 spf:
10000' - 10018' BKB (Ref. BHCS/GR, 9/27/79)
RECEIVED
Ir ?.
A!aska 0il & G~ C~. commission
Anchorage
.14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Title Supervisor, Res ./Prod.
The space belowTor Q~ommission use · . Surveillance II
Date
Conditions of Approval, if any:
By Order of
Approved by. COMMISSIONER the Commission
Date ........
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
STATE OF ALASKA ~--.
ALASKA C._ AND GAS CONSERVATION cO,..,vllSSlON
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
!1. Drilling well [] Workover operation []
2. Name of operator 7. Permit No.
SOHIO ALASKA PETROLEUM COMPANY 79-52
3. Address 8. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20388
4. Location of Well
at surface
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 55.09' AMSL
6. Lease Designation and Serial No.
ADL 28279
For the Month of January ,19 86
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well No.
R-6 (32-32-12-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
13. Casing or liner ru.n and quantities of cement, results of pressure tests
14. Coring resume and brief description
15. Logs run and depth where run
16. DST data, perforating data, shows of H2S, miscellaneous data
1/27/86:
Rigged up Schlumberger and perforated the interval 10000'-10018'BKB (Ref. BHCS/
GR, 9/27/79) using 2 1/8" HyperdOme guns at 4 spf. The well was put back on
injection~
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~~. _ ~-,'~7~'/, ~ Supervisor, Re s./Prod. DATE -'~'///~'
SIGNED ~TITLE Surveillance II
for eacl~calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
NOTE--Report on tSis form is required
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10404 Submit in duplicate
SOHIO ALASKA PETROLEUM COMPANY
JanuarY 10, 1986
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well R-6 (32-32-12-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and
Reports on Wells, for the above-named well. This contains
our proposal to perforate the well.
Yours very truly,
PFB:JAM~~
Enclosures (3)
P. F. Barth
Supervisor, Reservoir/
Production Surveillance Unit I
RECEIVED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL []
OTHER []
2. Name of Operator 7. Permit No.
SOHIO ALASKA PETROLEUM COMPANY 79-52
3. Address 8. APl Number
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 50-029-20388
4. Location of Well
At surface:
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
12.
J 6. Lease Designation and Serial No.
ADL 28279
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate ]~]( Alter Casing [] Perforations [] Altering Casing [-]
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10.407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following additional water injection interval will be perforated during January/
February 1986 at 4 spf:
10000' - 10018' BKB (Ref. BHCS/GR, 9/27/79)
,,,ECEIVED
Alaska 0il & &as Cons. uummissi0n
Anchorage
1.4. I hereby certify that the foregoing is true anxd/:orrect to the best of my knowledge.
Signed Title Supervisor Reservoir/ProductionDate
The space below for Commission use P. F. Barth Surveillance Unit I
Conditions of Approval, if any:
Approved by ..
z:'~p proved Copy
]~eturned
By Order of
COMMISSIONER the Commission
Form 10-403 Submit "Intentions" in Triplicate
n_ . ~ nn
SOHIO ALASKA PETROLEUM COMPANY
December 4, 1985
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well R-6 (32-32-12-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and
Reports on Wells, for the above-named well. This contains
our proposal to stimulate the well.
Yours very truly,
JAB: JAM'~?L
~upervisor Production Operations
Enclosures (3)
cc: Drilling Well Files (MB12-1)
Well Records (LR2-1)
R-6 Well File
R .CEIVED
0 !)
~,las~a Oil & Gas Cons. CorrlmiSSiOrt
Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL []
OTHER []
2. Name of Operator
Sohio Alaska Petroleum Company
3. Address
P. O. BOX 196612, Anchoraqe, Alaska
4. Location of Well
At surface:
7. Permit No.
79-52
8. APl Number
99519-6612 50- 029-20388
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM R-6 (32-32-12-13) PBU
11. Field and Pool
Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool
__ KBE = 55.09' AMSL I ADL 28279
12. Check Appropriate 8ox lo Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
SUBSEQUENT REPORT OF:
(Submit in Duplicate)
Altering Casing
[] Abandonment
[] Other
[]
[]
[]
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
A multi-stage bullheaded mud acid treatment is proposed for the following perforated inter-
vals in R-6 water injection well, preceded by a coiled tubing breakdown mud acid treatment
10018' - 10028' BKB
10038' - 10066' BKB
10076' - 10136' BKB
The initial breakdown treatment will consist of:
500 gal.
1250 gal.
2500 gal.
700 gal.
1000 gal.
The bullheaded
xylene
15% HC1 with 5% EGMBE mutual solvent
12% HC1 - 3% HF
15% HCl
3% ammonium chloride water
mud acid treatment will consist of:
RECEIVED
Alaska Oil & f3as Cons. C, OFtl~i$sjgfi
Anchorage
700 gal.
2000 gal.
3600 gal.
1000 gal.
1000 gal.
2000 gal.
3600 gal.
gelled 3% ammonium chloride water w/700 lbs. benzoic acid flakes
15% HCl with 5% mutual solvent
12% HC1 - 3% HF
15% HC1
gelled 3% ammonium chloride water w/1000 lbs. benzoic acid flakes
15% HC1 with 5% mutual solvent
12% HC1 - 3% HF
1000 gal. 15% HCl
700 gal. methanol will be pumped to dissolve the benzoic acid flakes and injection brine
will be flushed to the perforations. This work is scheduled to commence in December, 1985
34. I hereby certify that the foregoing is true and correct to the best of my knowledge.
"~i~ned ~ ~~ Title Supervisor Production Operatior~ete
The spa¢¢below for Commission use [/ (fJ. Ao Bragg
Conditions of Approval, if any:
Approved by COMMISSIONER
Approved C~y
RetLtrn~d
By Order of
the Commission
Date
Form 10-403 Submit "Intentions" ,n Triplicate
SOHIO ALASKA PETROLEUM COMPANY
CHEVRON
EYKON
To~SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
PHILLIPS
BPAE
31 I 1 "C" ST[1EET
ANCttORAG[, ALASKA
TELEPHONE [907l 265-0000
MAIL: POUCH 6-6 ! 2
ANCHORAGE. ALASKA 99502
Date: 10/23/85
Tt/: 76511
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
SFO/UNIT/STATE:
i;-4A GR-Position Tbg. 07/22/85 f/1 9400-10546 Sch 5"
i~-18 EPL 08/02/85 ~tl 9650-10220 Sch 5"
R-6 EPL 08/30/85 .~/1 9800-10373 Sch 5"
R-6 EPL 09/01/85 ~2 9800-10200 Sch 5"
D^ I t
. ,~ %-: -~>'~ ,
_~ ~ ..i--.. ,.,-'+-"- \.ictoria Aldridge LR2-1
.-~-..--...: .' Technical Documentation
/, /- ! ....... .~ ~,.~ ~ L:?-.:S <J~"~" .~" ' Records Management
~ ' -' t: ~ :;'. -', :;' '
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
TO: SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
PHILLIPS
STATE OF AK
. -
BPAE
31 1 1 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 9-27-85
T#: 76460
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowiedge receipt by signing a
copy of this letter and returning it to this office:--
SFO/UNIT/STATE:
F-9
M-9
R-6
8-10-85
8-21-85
8-14-85
8 -15-8 5
CFS (spinner) 9750-10060 GO #1 5"
Temp (pump-in) 10000-10586 GO 1 #1 5"
Temp (dynamic) 9800-10400 GO #1 5"
Temp (shut-in) 9800-10400 #2 'J
RECEIVED
DATf
y Perkins Lr 2-1
-. ~-. ?.' ?'-i i~' .,.~i~¼~,-' Tec~hnical Documentation
~ 9 Records Management
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TEXACO
~o: SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
311 I "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612.
ANCHORAGE, ALASKA 99502
Date:
T#:
09/16/85
76433
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
~'~A-1 ~ Static 08/21/85 Camco
~A-5j Static 09/02/85 Camco
~-8 / Static 07/09/85 Camco
~A-11 - static 09/05/85 Camco
__~-16- Static 08/22/85 Camco
-17 .z~ Pres.Drawdown 08/07/85 Camco
~-27~ Pr es. Drawdown 07/12/85 Camco
-"'~B- 6 ' Static 09/09/85 Camco
~"C-16- BHPD & PBU 09/01/85 Camco
~-17-' Static 08/26/85 Camco
~E-17 Static 08/28/85 Camco
~--F-9-- PBU &-BHPD 08/12/85 GO
~'M- 9 ~' PBU 07/11/85 Camco
~-~-~R-6-'~ PBU & BHPD 08/15/85 GO
~R-9-'~ Flowing Gradient 08/20/85 Camco
'~'R-2~ Step Rate Test 05/29/85 Sch
~R-24' Data Frac 05/29/85 Sch
"~U-4 - Static 09/05/85 Camco
~-U-5j Static 09/05/85 Camco
Static 08/30/85 Camco
-5' Static 09/04/85 Camco
-6~ Flowing Gradient 08/27/85 Camco
~'~Y-S" . Static 09/07/85 Camco
~'~-ll/Flowing Gradient & ]SHPD 08/26/85
Camco
RECEIVED
DATE
Victoria Aldridge LR2-1
Technical Documentation
Records Management
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHQRAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502~612
September 1 O, 1985
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr, C V, Chatterton
Well R-6 (32-32-12~13) PBU
Gentl emen-
Enclosed in duplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above named well.
Yours very truly,
R. S. Allan
District Drilling Engineer
RSA:SRB :JLH:kkm
091 085: 0661 N
Enclosure
cc: T. N. Tyler, MB9-2
Well Records (LR2-1)
P. E. Well File #17
Drilling Well File #17
RECEIVED
1 . .
~ STATE OF ALASKA
' ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WEL S
1. DRILLING WELL [] COMPLETED WELL ~
2. Name of Operator I 7. PermitNo.
SOHIO Alaska Petroleum Company I 79-52
~ 8. APl Number
3. Address
P. 0. Box 6612, Anchorage, Alaska 99502 5°-029-20388
9, Unit or Lease Name
4. Location of Well
At Surface: Pr'~d hn~
729' NSL, 1400' EWL, Sec. 32, TI2N, R13E, UPM 1-O~V~ell'h~u~nb~r"~ .....
p R /' q')_~'~_~ '~_1 ~ ~pB
,III ~
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 55,09' AMSL
12.
Perforate
Stimulate
Repair Well
Pull Tubing [] Other [~ Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Prudhoe Bay
I6. Lease Designation and Serial No.
ADL 28279
Check Appropriate Box To Indicate Nature of Notice, Report, or O~l~e~)'~a
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
[] Alter Casing [] Perforations [] Altering Casing
[] Abandon [] Stimulation [] Abandonment
[] Change Plans [] Repairs Made [] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Well R-6 is a produced water injector. A channel behind the 7" liner was
identified from the lowest perforated interval to the 0WC. The intent of the
work performed was to cement squeeze the channel using a coiled tubing unit. The
work performed is outlined as follows:
·
·
4.
5.
6.
Laid heavy mud from PBTD to 1 01 80' G"
Pumped 15 bbls. of low fluid ioss Class "
squeezed off all perforated .intervals, (10018'
10038' -- 10066', 10076' -- 10136').
Contaminated cement in wellbore.
Reversed out contaminated cement after 12 hours.
Re-perforated the original
Put well back o.n injection.
cement and
-- 10028',
intervals as listed in Step #2.
The above work was successfully completed on September 6, 1985 and verbally
approved by Mr. Lonnie Smith in a telephone conversation with Scott Bundy on
September 8, 1985.
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~ ~- (~~-~- Title District Drilling Engineer
The space below for Commission use
Date
Conditions of APproval, if any:
Approved by
By Order of
COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO: SFo/UNiT/STATE: TEXACO
(-.Marathon) MOBIL
PHILLIPS
STATE 'OF AK-"
BPAE
311 I "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 7/26/85
TI/: 76340
REFERENCE:
SOHIO CASED HOLE FINAL LOGS //
The following material is being submitted herewit~~ease acknowledge receipt by signing a
copy of this letter and returning it to this office:-
_-I ? CN~ 3/17/85 #3 9100-9772 .... Sch 5"
10-/ CNL(CNTD2 1/2") 5/20/85 #1 10850-11672 Sch 5"
Q-3f CNL 3/16/85 #4 8600-9428 Sch 5"
M-i/' EPL -3/2/85 #1 8600-8899 Sch 5"
M-9-" EPL 3/10/85 #3 9950-10300 Sch 5"
R-6/' EPL 1/10/85 #3 9850-10400 Sch 5"
A-8j DFT 7/9/85 #1 9590-9840 Camco 5"
A-17 / Temp. 7/7/85 #1 9850-10750 Camco 5"
A-27-" DFT 7/12/85 #1 8800-9300 Camco 5"
H-9~_ DFT 7/11/85 #1 9600-10356 Camco 5"
U-3/ Temp. 7/05/85 #2 8950-9550 Camco 5"
U-9 j Temp. 7/3/85 #2 10850-11300 Camco 5"
R£CE~VED
19
Oil & Gas Cons. Cornrnissiorl
Anchorage
Victoria Aldridge LR2-1
Technical Documentation
Records Management
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO: SFO/UNIT/STATE: TEXACO
(.Marathon) MOBIL
PHILLIPS
STATE
BPA~ (Transmittal Only)
3111 "C"
ANCHORAG[ ALASKA
I[:LEPHONE 1907) 265-0000
MAIL: POUCH 6.612
ANCHORAGE, ALASKA 99502
Date: 4/02/85
T#: 76095
REFERENCE:
S~FINAL DATA - PRESSURE SURVEY DATA
f/The following material is being submitted herewith. Please ackr~owledge receipt by signing a
copy of this letter and returning it to this office:-
S-14
R-6
Pressure Falloff
Pressure Falloff
1/03/85 Scln
1/13/85 Scan
Rf_CEIVED
DATE
Cathy Perkins LR 2-1
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
December 18, 1984
Alaska Oil &Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well R-6 (32-32-12-13) PBU
Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named well. This contains our subsequent to
reperforating this well.
w
JAB/~/pj
James A. Bragg
District Petroleum Engineer (Acting)
Enclosures
cc: A. E. Leske
Geology
Well File #17
Oil & Ga.~ Cons. Cc, remission
Anchora.~je
r--, STATE OF ALASKA
ALASKA LAND GAS CONSERVATION C(. MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator
Sohio Alaska Petroleum ~y
3. Address
P.O. Box 6612, Anchorage, Alaska
99502
4. Location of Well
At Surface:
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 55.09' AMSL
12.
I 6. Lease Designation and Serial No.
ADL 28279
7. Permit No.
79-52
8. APl Number
50-029-20388
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Apl~ropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate' [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
(Submit in Duplicate)
[~ Altering Casing []
[] Abandonment []
[] Other []
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals in this well were reperforated December 16, 1984 using
Schlumberger 2-1/8" enerjets at 4 spf. A lubricator was installed and tested
to 3500 psi for all well work.
10,018'-10,028' BKB (Ref. BHCS/GR, 9-27-79)
10,038'-10,066' BKB ( " )
10,076'-10,136' BKB ( " )
An SSSV was set and tested in the ball valve niPPle at 1992'.
,.1~. hereby certify that th~ue an~rect to the best of my knowledge.
n Title District Petroleum Engineer
The space below for Commission use
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1430
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET, ~'~-
ANCHORAGE, ALASKA ¢/
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612 /
ANCHORAGE, ALASKA 99502-0612 /f ~,.
December 14, 1984
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive'
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well R-6 (32-32-12-13) PBU
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named well. This contains our proposal to
reperforate the well.
JAB/~pjw
Enclosures
James A.
Bragg
District Petroleum Engineer
cc: A. E. Leske
Geology
Well File ~17
REc..r- IV F..D
r%'~'"r-' z, ,984.-
STATE
ALASKA ~'~-. AND GAS CONSERVATION CC-~,MISSION
SUNDRY I ,,JTICES AND REPORT JN WELLS
1. DRILLING WELL []
COMPLETED WELLZ3
OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum ~y 79-52
3. Address 8. APl Number
P.O. Box 6612, Anchorage, Alaska 99502 50-029-20388
4. Location of Well
At Surface:
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, I/PM
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
KBE = 55.09' AMSL I ADL 28279
12.
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13) PBU
11. Field and Pool
?z~dhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate' I~ Alter Casipg [] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals will be reperforated in De~, 1984 using Schlumberger
2-1/8" enerjets at 4 spf. A lubricator will be installed and tested to 3500 psi
for all well work.-
10,018'-10,028' BKB (Ref. BHCS/GR, 9-27-79)
10,038'-10,066' BKB ( " )
10,076'-10,~36' BKB ( " )
i? r:'!j z,
An SSSV will be set and tested in the ball valve nipple at 1992'.
Alaska Oil & Ga',:; (;nn~ {,~; mlissioP,
*Verbal approval of this job was given to Mike Martin of Sohio by Mike Minder Of the
State of Alaska the morning '.of December 14, 1984.
Subsequent Y¥'°rk I{eported
o.
Fhereby certify that the foregoing is true a~;~ect to the best of my knowledge.
ig~ _r~~~_,~,--'E...,~,-~~ Title District Petroleum Engineer
The space below for Commission use
Conditions of Approval, if any:
Approved by COMMISSIONER
Approv~ Cupv
ilmturnsd
By Order of
the Commission
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
SFO
A~CO
CHEVRON
EXXON
31 I 1 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
To~SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
PHILLIPS
BPAE
CENTRAL FILES (CC# ' s-Transmittal Only)
Date: 11-28-84
CC#: 75898
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
9-23-84 #1,2,3,4 9250-9810 Sch 5"
9-3-84 #1 8900-9020 Sch ~
9-27-84 #2 Surf-10577 Sch 5"
8-23-84 #1 50-10500 Sch 5"
9-6-84 #1 Surf-10250 Sch -
8-29-84 #1 10050-10350 Sch 5
'11/84)
RECEIVED
OAT[
Ai~tsk:~ Oi~ & GsS Cons. Con, mission
Anchorage
Carolyn Bishop
Development Geology
Well Records
~ ~DEXED
SOHIO ALASKA PETROLEUM COMPANY
S¥0
ARCO
CHEVRON
EXXON
TO- SFO/UNIT/STATE: GETTY
(-Marathon) MOBIL
PHILLIPS
BPAE (Transmittal Only)
CENTRAL FILES (CC#'s - Transmittal Only)
3111 °'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 10-15-84
CC#: 75802
REFERENCE:
SO~I~O FINAL DATA- PRESSURE SLrRVEY
DATA
~'~The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
M-20
R-6
PBU & PBU Data Sheet 9-23-84
Pressure Fall-off & Data Sheet 9-27-84
C~mco
Sch
(4/82)
RECEIVED
DATE
Carolyn Bishop
Development Geology
Well Records
Alaska OJi & g-'as Co,is. Commission
SOHIO ALASKA PETROLEUM COMPANY
~O~ SFO/UNIT/STATE '
(-Marathon)
SFO
ARCO
CHEVRON
EXXON
GETTY
MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
CENTRAL FILES (CC#'s - Transmittal Only)
3111 "C"SIREEI
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL. POUCH 6.612
ANCHORAGE, ALASKA 99502
Date: 6-26-84
CC#: 75441
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipl by signing a
copy of this letter and returning it to this office:-
R-6 Static Survey 6-7-84 GO
(4/82)
RECEIVED
DA T I
Car()] '...' ~,
Deve].opmen t G(.,ol ogy
Well Record~
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
3111 '°C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
GETTY
To:SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
STATE!
BPAE (Transmittal 0nly)
CENTRAL FILES (CC#'s - Transmittal Only)
Date:
CC#:
5-18-84
75311
REFERENCE:
S0~4~ FINAL DATA - PRESSURE SURVEY DATA
L/The following material is being submitted herewith. Please acknowledge receipt by signing a
.
copy of this letter and returning it to this office:--
WEST y'ND TEST WELL
PBU & PBU Data Sheet
PBU & PBU DATA Sheet
STEP RATE TEST
4-25-84 GO
5-12-84 GO
4/15-17/84 Dresser
(4/82)
RECEIVED
DATE
19
Carolyn Bishop
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
February 29, 1984
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Gentlemen:
Enclosed,
well.
Mr. C. V. Chatterton
Well R-6 (32-32-12-13) PBU
in duplicate, are the following forms for
1. Form 10-407, Well Completion Report;
2. Form 10-403, Sundry Notice and Reports on Wells.
the above named
GJP/~/pjw
Enclosures
cc: J. D. Hartz
Geology
Well File ~17
Yours very truly,
troleum Engineer
'-' .... -- STATE OF ALASKA
ALASK,?' :~_AND GAS CONSERVATION (- "4MISSION ~~~/
WELL COMPLETION OR RECOMPLETION REPORT AND LO
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICERS] Water Injection ...
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleum (bmpany ?9-52
8. APl Number
3'~¢c~6e~ 6-612, Anchorage, Alaska 99502 5o-029-20388
4. Location of well at surface 9. Unit or Lease Name
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM prudhoe Bay Unit
At Top Producing Interval 10. Well Number
1904' SNL, 1422' WEL, Sec. 32, T12N, R13E, UPM R-6 (32-32-12-13)
At Total Depth 11. Field and Pool
1848' SNL, 1166' WEL, Sec. 32, T12N, R13E, UPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 55,09' AMSLI ADL 28279
12. Date Spudded 13. Date I.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions
9/11/79 9/27/79 1/28/80J feet MSL
17. Total Depth (MD+TVD) 18.Plug Back Depth(MD+TVD) 19. Directional Survey I 20. Depth Where SSSV set 21. Thickness of Permafrost
10688'MD 9537'TVD 10630'MD 9483'TVD YES E~ NO[~I 1992 feetMD 2006'
22. Type Electric or Other Logs Run
DIL/SP/GR, BHCS/GR/FDC/f/qL/GR/Cal, Sidewall Cores
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" x 30 " InsulatedConducto~ Surface 110 ' 36" 605 cu. ft. Arcticset
13 3/8" 72# L-80 Surface 2661' 17 1/2" 3853 fu.ft. Permafrost
9 5/8" 47# L-80 Surface 9740' 12 1/4" 1384 cu. ft. Class 6; 130ft. Perma_fros'
7" 29# L-80 9227~ 10681' 8 1/2" 336 cu. ft. Class
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
, ,
interval, size and number) MD TVDss SIZE DEPTH SET (MD) PACKER SET (MD)
4 1/2" 9293' 9180 '
Prudhoe Oil Pool Top: 10018' 8865"
Bottom: 10136" 8972 ' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
10018'-10028' BKB (8865'-8874' TVDss)
10038'-10066' BKB (8883'--8908' TVDss)
10076 '-10136 ' BKB (8918'-8972'- TVDss)
27. PRODUCTION TEST
Date First ProductiOn I Method of Operation (Flowing, gas lift, etc.)
1-27780I Water Injection
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD I~
I
Flow.Tubing Casing Pressure CALCULATED' OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
PreSs. 24-HOUR RATE I~
?8. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
,'.: ........
Form 10-407 Submit in duplicate
Rev. 7-1~80 CONTINUED ON REVERSE SIDE
2g. 30.
·
GEOLOGIC MARKERS FORMATION TESTS .
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
_..
BKB ~$e~
Sag R. SST. 9 84 8 ' 8711"
Shublik 9905 ' 8762 '
Ivishak 9995 ' 8844 '
31. LIST OF ATTACHMENTS
3(~ I hereby certify,~pat the foregoing is true and correct to the best of my knowledge
Signed~Z~~~~'~"b' ~'~ ~TitleDiStrict Petroleum En~ieneer
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevatign is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
STATE OF ALASKA ----
ALASK..,:tLAND GAS CONSERVATION L r~,iMISSlON
SUNDRY NOTICES AND REPORTS ON WELLS
OTHER
1. DRILLING WELL []
COMPLETED WELL []
2. Name.of ODerato_r 7. Permi.~o.52
Sohzo Alaska Petroleum Oompany
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029:20388
4. Location of Well
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 55.09' AMSL
I 6
. Lease Designation and Serial No.
ADL 28279
12.
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Bay Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [~: Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
This well was converted from a Prddhoe Bay production well into a produced water
injection well for 1984 P.W.I. water evaluation on February 20, 1984.
Water was injected through the following perforations at 4 s.p.f.
10018'-10028' BKB (Ref. BHCS/GR, 9-27-79)
10038'-10066' BKB ( " )
10076'-10136' BKB ( " )
hereby certify/at the foregoing is true and correct to the best of my knowledge.
ed ~.~ Title District P~troleum Enqineer
Zhespace el w for Commission use, ace/~t, //U ~/
Conditi~'ns ~f Approval, if any: ~
Date
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
January 27, 1984
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99502
Attention: Mr. C. V. Chatterton
Gentlemen:
Well R-6 (32-32-12-13) PBU
Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named well. This contains our proposal to
convert an oil well into a water injection well.
GJP/~/pjw
Enclosures
Yours very truly,
istrict Petroleum Engineer
CC:
J. D. Hartz
R. M. Mayer
Well File ~17
STATE OF ALASKA ~"
ALASKA OIL AND GAS CONSERVATION CUMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL[] COMPLETED WELL[] OTHER []
2. Name of Operator 7. Permit No. Sohio Alaska Petroleum ~y 79-52
3. Address 8. APl Number
Pouch 6-612, Anchorage, AK 99502 50- 029-20388
4. Location of Well
At Surface:
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 55.09' AMSL
I6. Lease Designation and Serial No.
ADL 28279
12.
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other j~] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
With reference to the previous Sundry ~tices dated January 7,
1980 and February 7, 1980 for the perforation of R-6 in the 7"
liner, it is intended to convert this Prudhoe Bay Production well
into a produced water injection well during February/March 1984
for additional GC-2 PWI capacity. Water will be injected through
perforations (4 spf) at:
10018'-10028, BKB (Ref. BHCS/GR,09-27-79)
10038'-10066' BKB ( " )
10076'-10136' BKB ( " )
JAN 3 ,o 'i984.
-~t ~o~k, ~ . ~q/¢l~4'~L~ka Oil & Gas Coho. Commission
o~ Fo~m No. ~
14. I hereby/6ertify that the foregoing is true and correct to the best of my knowledge.
Signed.~/¢~~//' Co~mission~use~A ~o-~/ ~ TitleDiStrict Petroleum Engineer
Th,p, 7~ below for
/ /
Co~tions of Approval, if any:
Date
Approved by
6RIG~NA[ SIGIlIEB
8Y [OH~'~.LE C. SMITII
Approved Copy
Returned
By Order of
COMMISSIONER the Commission Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
November 8, 1983
Alaska Oil & Gas Conservation Ccmm%tssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. Lonnie Smith, Conm%isssioner
Gentlemen:
W~L?'. 'R-6 '(32-32-12-13) PBU
Reference is made to your letter dated October 12, 1983 re above-
named well.
Enclosed, in duplicate, is Form 10-403, Sundry Notices - Subsequent
report of notice of intention dated 6-1-81 as you requested.
This work Was not performed. ThiS should complete your records
on this well.
Very truly yours,
District Drilling Engineer
cc: Well File #17
STATE OF ALASKA
ALASKA (JIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
i. DRILLING WELL [] COMPLETED WELL
;~. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Cc~pany 79-52
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20388
OTHER
4. Location of Well
At surface:
729' NSL, 1400' E~K., Sec. 32, T12N, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc;)
KBE = 55.09' AMSL
12.
6. Lease Designation and Serial No.
ADL 28279
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing r-'] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The work outlined for Well R-6 in the Sundry Notice of Intention dated 6-1-81
was not performed.
14. ! ~e. reby ~ that thp foreg~i~true anql~,orrect to the best of my knowledge.
s~,g,: ~_ ~ ~ Tide District Drilli.nq Enqineer
The space below for Commission use R.H. Reile~
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403 Submit "Intentions" in Triplicate
October 12, 1983
~-r. R. }~. Reiley,
District Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Subsequent P. eports, Sundry ~otices and
~_e¥.~rts on Wells (Fo~n-n 10-403)
Dear ~.4r. Reiley:
For the follcwin~3 lists of "Eotice of Intention ~'o:" Sundry i~otices
and Reports cn ~ells (form 10-403) this oflice dc>es not have on
record the "Subsequent P. epcrt el:" defining tke acticn taken on
the approved intention. Please advise this ofiice k~y Subsequent
Report of t~e dis~osition of the intention.
Well Sohio Date
Y-i2 01-14-81
E.- 9 05-22-81
R-6 05-30-81
Y-1 07-30-81
L~-i0 09-22-~-1
f-~-! C i0-14-~!
}{-!2 10-20-81
Erie£ De_sc_rip~tion of I~tenticn
Ceased drilling o~erations.
gqueeze c e~en t.
Perforate l~r...ur and squeeze
c er:ent.
i~.el~.lace l~roduction packer.
l{e~lace l~rceucticn z-acker-
~u~: tubin~ %~it!: 9as t~ft
equit~ment.
P.e~lace col la~med gas lift
~andrel.
.~r. R. P~. Beiley
Cctoh~r 12, 1983
Page 2
Well
Sag Delta
Sag Delta
S-1
T-7
Sincerely,
Ionnie C. Smith
Commissioner
LCS/~: lc ~ 105 ~ D8
Sohio Date
~ .... ~-~_ ......
12-12-81
01-21-82
~ ~-82
04-15-82
04-20-82
Brief ~_D_e$criptlcn_ o~_ I_nte_nt_ion
Y{e-enter to test.
Suspend drilling oi~erations.
Revised
Plug back and redrill.
Change plans.
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 1907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
EXXON
TO: SFO/UNIT/STATE'
(-Marathon)
GETTY
MOBIL
PHILLIPS
STATE OF AK
BPAE (Transmittal Only) _
CENTRAL FILES (CC#' s-Transmittal Only)
Date' 8/8/83
CC#: 74627
REFERENCE:
__O_HI__OHO__._~__LE FINAL LOGS
CASED
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
SFO/UNIT/STATE:
/E-18
/E-!9
7'B-22
.-M-2
~.X-4
/X-13
~-H-11
iX-14
~-A-23
~-X-18
~-R-6
CNL 6/14/83 #1 10250-11184 Sch 5"
DDNLL/GR 3/20/83 #1 10850-11730 Dres 5"
Spinner 7/17/83 #2 10800-11100 Otis 5"
Temp. 7/20/83 #1 10000-10350 Otis 5"
Temp. Diff. 7/22/83 #1 9500-10050 Otis 5"
Temp. Diff. 7/24/83 #1 10000-10480 Otis 5"
C/O 4/1/83 #1 9130-9600 Dres 5"
GEL 5/24/83 #1 11000-11205 Sch 5"
PFC/GR 3/23/83 #- Dres 5"
PFC/GR 4/7/83 #- Dres 5"
C.A.T. Log 4/9/83 #1' 100-9209 Dres 5"
(4/82)
RECEIVED
DArE
Victoria Aldridge
Development Geology
Well Records TP 1-5
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6.612
ANCHORAGE, ALASKA 99502
April 26, 1983
Alaska Oil & Gas Conservation Conmtission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
'Well 'R-6 (32-32-12-13) (PBU)
Enclosed, in duplicate, is Form 10-403, Sundry Notice-and Reports
on Wells, for the above-named well. This gives Subsequent Report
of pulling tubing in well.
Very truly yours,
R. H. Reiley
District Drilling Engineer
encs
cc: Well File #17
STATE OF ALASKA '~-'~
ALASKA L~IL AND GAS CONSERVATION CO,v~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL []
OTHERJ~
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 79-52
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 s0-029-20388
4. Location of Well
9. Unit or Lease Name
Prudhoe Bay Unit
At Surface:
729' NSL, 1400' ~L, Sec. 32, T12N, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 55' AMSL
6. Lease Designation and Serial No.
ADL 28279
10. Well Number
R-6 (32-32-12-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stim u late [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The 7" tubing and packer were pulled from Well R-6. A new string of 4 1/2"
tubing was run complete with production packer, sliding sleeve and gas lift
mandrels. This ~rk was completed April 13, 1983.
14. I hereby certify, that the foregoing is t~e and correct to the best of my knowledge.
\, ~' ~ , _ IR / District Drilling Engineer
Signed ~ ~ ~.~l~t.~ / ~~Title '
The space below for Commission use ~. ~~e~
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1430
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
March 30, 1983
Alaska Oil & Gas Conservation Co~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
'WRT'.T'. 'R-6 (32-32-12-13) PBU
Enclosed in triplicate is Fo~m 10-403, Sundry Notices and
Reports on Wells, for the above-named well. This gives notice
of intention to repair the well.
Very truly yours,
R. H. Reiley
District Drilling Engineer
encs
Anchorage
STATE OF ALASKA -"
ALASKA UlL AND GAS CONSERVATION CO,v~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL []
OTHER :~g~
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 79-52
3. Address 8. APl Number
Pouch 6-612, Anchoraqe, Alaska 99502 50- 029-20388
4. Location of Well
At Surface:
729' NSL, 1400' EWL, Sec 32, T12N, R13E UPM.
6. Lease Designation and Serial No.
ADL 282 79
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 55' AMSL
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well ["- Change Plans [] Repairs Made
Pull Tubing ~] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10o407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
It is intended to pull the present 7" completion, clean out to PBTD and rerun new
4 1/2" completion with gas lift mandrels.
This operation is scheduled for April, 1983.
o~ Form ~°'/
MAR3 i ~'~ :'
Alaska 0il & Gas Cuns~ (;ommission
Anchorage
14. I hereby certify that thee foregoing is true and corJlegt to the best of my knowledge.
The space below for Commission use R.H. Reiley
Drilling Engineer
Date 03/30/83
Conditions of Approval, if any:
Approved by
QIIIiIIItlT
BY tOl,,:qlE C. $111ll
Approved Copy
Returned
By Order of
COMMISSIONER the Commission
Date
Form 10403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
June 1, 1981
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well R-6 (32-32-12-13)
Enclosed, in triplicate, is Form 10-403, Sundry Notice and
Reports on Wells, for the above-namedwell. This contains
our proposal to repair the well.
RHR:ja
Enclosures
cc: Well File #17
Yours very truly,
District Drilling Engineer
RE£EIVED
JUN - 1 1981
011 & Gas Cons. Commission
A,3chorage
STATE OF ALASKA -"~
ALASKA'~IL AND GAS CONSERVATION CC ..,MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL []
OTHER
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 79-52
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 s0-029-20388
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
4. Location of Well
At surface:
5. Elevation in feet (indicate I<B, DF, etc.)
KBE = 55.09' AMSL
6. Lease Designation and Serial No.
ADL 28279
9, Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
R-6 (32-32-12-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] ~ Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
[]
[]
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Well R-6 will be worked over due to high water production starting June 23, 1981. The
proposed work is as follows:
1. Move in rig and kill well with NaC1 workover fluid.
2. Pull tubing and retrieve packer.
3. Perforate liner and squeeze cement.
4. Run 5 1/2" tubing and gas lift equipment.
5. Move rig off.
RECEIVED
JUN - 1 1981
Alaska 011 & Gas Cons. Commission
Anchorage
14. I hereby/~ce~~true and correct to the best of my knowledge.
Signed ~ ---v-...~,.., .----------.~. TitleDiStrict Drilling Engineer
The space below for Commission use R. H.~eiley
Conditions of Approval, if any'
ORIGINAl SIGNED'
BY LOHNIE C. SMITH
Approved by. COMMISSIONER
Date
Approved Copy
Returned
8y Order of
the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Re.~ources Company
ARCO
SOHIO-BP ALASKA PRODUCTION DIVISION C}:cvr~- --',~"~ .......
·
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCtt 6-612
ANCHORAGE, ALASKA 99502
REFERENCE:
SOHIO DATA '
~he following material is bein§ submitted herewith. Please acknowledge receipt by si§nih§ a
copy of this letter and returning it to this offi..ce:- _ .......... , ........ · ....... -' --
SFO/UNIT/STATE:
(-Marathon)
SFO/UqqlT/STATE:
(-Marathon)
D-14
Y-3
BottomHole Pressure Data Form & Survey
F-4 CH CNL 2/1/80
EPL 1/25/81
~....:-¢- - ?../. ,, .~_f'
RECEIVED
2/4/81 (Ca~',mo)
2/14/81(Go)
#5 5"
#1 5'~
Carol Krieter
Well Records
Con't...
Alaska Oil & G,qs Cons. Con]mission
Anchorage
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
SFO/UNIT/STATE:
REFERENCE:
Mobil--=~----~ ~ ~
Phillips ~ ' -' ""
B?AE _ ' -
SFO -- ' "
3111 "C" STRt~ET i
ANCHORAGE, AL~SKQi..
TELEPHONE (907)a65'-~00":
ANCHORAGE, ALASKA. 99502 '
~ ~~} ~ .,...
-- "
......~ ,. .
2/10/81 #6;
- ! s?,T -r~c
CONFER:
FIEF:
SOHIO DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
SFO/UNIT/STATE:
(-Marathon)
Pressure Survey & BottomHole Pressure Data Fom (Sch) 1/26/81
" " " " " "(Otis) 1/30/81
Carol Kriet
Well Records
DATE F~'I ~ 1981-~
N~ 0il & Gas Cons, Commission
~chorage
19
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SFO/UNIT/STATE: ~ ~
-~ 12/15/80 ~/52t
(-Marathon) '~ .,,..----~-
SFO/UNIT/STATE:
(-Marathon)
SOHIO--BP ALASKA PRODUCTION DIVISION
TO:
REFERENCE:
l'-'/-cot,,',N~__b..l..
3111 "C" STR~-
ANCHORAGE,
TELEPHONE (907)~R~~
MAIL: POUCH 6b~'i-'3 GEOL'
~ I STAT TLC
I '
[~'~[~;
/
S.0~IO FINAL CASED HOLE DATA
,,"The following material is being submitted herewith. Please acknowledge receipt by signing a
~,/ copy of this letter and returning it to this office:--
M-3 Spinner 11/17/80 #1 5"
Q-3 Flowmeter
.~?' R-4 ~ CCL
ii/lo/so #1 ~"
11/26/80 · #1 5"
Carol Kr~E
Well Records
DATE
19
Oil & Gas Cons. Commission
Ancharar,,',
SOHIO. PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
ARCO
TO: EXXON
PHILLIPS
SF0
ANCHO RAG E, AL---..A~. K. ,A.. -
TELEPHONE (90d:~6~;d060;C:
MAIL:POUC'h,66i2,-~
l'-'i
I._% ' ' ......
9/~6/80
ST/.,T T~C.
REFERENCE:
SOHIO MAGNETIC TAPES
,~'~ following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office'--
: On Transmittal #338, Dated 9/4/80, first tape was listed
s D-4. Should be D-14. Label on tape is wrong, Print out is correct.
H-10 Magnetic Tape 7/25/80 #2 #60764
" " 5/16/80 #2 #60557
X-11 " " 8/11/80 #1&2 #60736
(Also, for your convience, I Will put a check in the upper right corner
of the box with the transmittal in it and put the address lable on the
same box. Sorry for the past inconvience.)
Well Records
19
..L I
~ 1ENG
8OHIO PETROLEUM 'j .... 2 Er,~o~ ~, s~T
GOMPANY
I ~ 3 ::.. ANCFORAGE, ALASKA
(907) 265-0000
SOHIO-BP ALASKA PRODUCTION DIVISION ~~ - ' - :~ i ~ C~H~RAGE,
ALASKA
99502
_
TO:
SFO/U~IT/STATE
Mobil ,
Phillip, ,
BI:'AE
i i i
__ z I ST:~TTEC
CONFER: 6/~.2
.... [FILF:
I
i i L I L ___
'80 ~1226
~FO/UNIT/STATE
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
·
.
T~he following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
B.-8 CNL 5/22/80 .~/2 5"
C-3 CNL 5/28/80 ,~/1 5"
C-8 CNL 5/25/80 t/3 5"
C-9 CNL 5/28/80 tt'l 5,4
D-5 CNL 5/30/80 It2 5"
E-2 CNL 5/25/80 tt6 5"
E-5 CNL 5/29/80 ¢/2 5"
J-2 CNL 6/04/80 ~/3 5"
J-5 CNL 5/24/80 ~/5 5"
N-5 CNL 5/31/80 ~/2 5"
N-6 CNL 5/26/80 I/2 5"
Q-2 CNL 5/23/80 t/1 5"
CNL ' 5/23/80 t/1 5"
TDT-M 5/16 / 80 ti 2 5"
~nn~ B'arns
Well Records
Redi-Kwik0 Quality Litho
SOHIO PETROLEUM COMPANY
(" ?/~;~ ,7,.,' ..~ 3111 "C" STREET
Division of Sohio Natural Resources Company ~.~,~ ,4 ~ICHORAGE, ALASKA
(907) 265-0000
SOHIO--BP ALASKA PRODUCTION DIVISION
TO:
SFO/UNIT/STATE
(-Marathon)
~ ii i i J
__
M. obil .....
--
~ilhps .... , _
BPAE .......
SFO . ,
REFERENCE:
S~HIO FINAL CASED HOL, E DATA '
·
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
6/9/80 #190
B-1 Flowmeter 4/30/80 #1 5"
B-3A' Spinner 10/19/79 #1 5"
B-6 Spinner 10/30/79 t/1 5"'
D-11 Temperature 5 / 12 / 80 # 1 5"
E-1 Spinner 5/9/80 #1 5"
E-7 Temperature 4/30/80 #1 5"
F-1 Spinner 4/25/80 #1 5"
F-4 Spinner 5/6/80 #1 5"
H-3 EPL 4/30/80 #1 5"
M-2 Spinner " 4/27/80 #1 5"
M-6 Spinner ~ 4/8/80 #1 5"
N-2 Spinner 4/6/80 5"
X-6 Diff. Temp. Log '-5/1/80 #1 5"
X-7 Temperature :, 5/13/80 #1 5"
Getty St. #1 TDT-M ,- 5/7/80 #1 5"
A-4 CNL '~ 5/18/80 #2 5"
D-4 CNL 5/20/80 #3 5"
F-10 CNL '~ 5/19/80 #1 5"
H-7 CNL . 5/20/80 tt3 5"
5/13/80 #1 5"
X-4 CCL/Per. ,
EPL 5/17/80 #2 5"
Carol Krieter~
Wel.1 Records
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
~J I GEOL
·oE°L
GEOL
J STAT TEC
CONFFR:
~ILF: -
3111 "C" STRE T
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
SOHIO-BP ALASKA PRODUCTION DIVISIONr~J~OO
C~ -
TO:
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
SFO/UNIT/STATE
REFERENCE:
5/8/80 #131
,.
SOHIO DATA ..
~:g The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office'--
EO/UNIT/STATE:
(-Marathon)
C-5 Pressure Gradient Survey/Raw Data 3/20/80
E-5 BohtomHole Pressure Data Form & Survey 3/10/80
E-6 " " " " " " 4/13/80
F-1 :; " " " .... 4/25/80
M-2 " " " " " " 4/27/80
N-1 " " " " " " 4/10/80
N-5 " " " " " " 4/18/80
~~BottomHole Pressure Data Form & Survey 3/12/80
(Dresser.)
( Schlum. )
(Otis)
(Go)
(GO)
( Schlum. )
(otis)
( Schlum. )
Well Records
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO: -- 'i
ARCO ! ' '
..
PHILLIPS · , .
EXXON .......
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
5/13/80 #144
·
SFO · · '
..
REFERENCE:
, .
·
. .
-SOHIO MAGNETIC TAPES
.
//~e~ following material is being submitted herewith.. Pleaseacknow]edge receipt by signing a
copy' of this letter and returning it to this office'-
MAGNETIC TAPES ON THE 'FOLLOWING:
C-8
J-1
J-9
12/31/79"
7/232.79
11/26/79,
3/13/80"
4/12/80
#60136
#60200
#60053
#60352
#60421 -.
- ar~o~l/ Krieter' ' '
Well Records
R i~':~. C [~ ,I. 'V i:,. D
R E CE,~-y ED ~ ~ .....
DATE
19
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
C~
TO:
SFO/UNIT/STATE
REFERENCE:
I 'STAT TEC
--
.
STAT TEC
C~t~- ' -' ' -?~6~F'~-~~. --
; FILF~ ....... 4/18/80
--
i
SFO ~
SOHIO DATA
/
//~,The following material is being submitted herewith. Please acknowledge receipt by signing
copy of this letter and returning it to this office:-
A-2
SFO/UNIT/STATE: C-7
FINAL CASED HOLE: E-2
(-Marathon) F- 13
J-1
R-2
R-6
X-4
X-5
PRESSURE SURVEYS :~D-1~/
~¢ ~E-3~/
~¢'"'"" ,-~ / E-4J
oL' -
Spinner 3/8/80 #1
EPA 3/3/80 ~1
EPA 3/7/80 #1
Temp. Log 3/4/80 #1
Spinner 3/7/80 #1
DDNLL 3/3/80 #1
TDT-M 3/14/80 #1
TDT-M 3/13/80 #1
EPA 3/11/80 #1
Mudlog 12/25/79-1/23/80
Temp. Log 3/5/80 #1
Spectralog 2/20/80 #1
#110A
1!
2"/5" (1 Log)
5"
5"
5"
5"
5"
5"
5"
5"
Bottom-Hole Pressure Data Form& Survey
3/10/80 (Otis)
3/17/80 (Go)
3/16/80 (Otis)
2!11!80 (Go)
Well Records
· RECEIVED
DATE
"
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
3111 "C"STREET
ANCHORAGE, ALASKA
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
SFO/UNIT/STATE
REFERENCE:
ARCO
Exxon
Mar~tbo~ ........
Mobil
Phillips ....... ---- .
BPA_E
SFO , - _ _ - .... - _-_
TELEPHONE (907)265.0000
MAlt.: POUCH 6-612
ANCHORAGE, ALASKA 99502
3/12/80 #057
'FO/UNIT/STATE:
'CH-Marathon)
SOHIO DATA
"he following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
"O/UNIT/STATE:
A-6 Spectralog 1/20/80
F-1 Spectralog 1/22/80
J-1 CNL(Corrected Log) 3/30/79
R-1 Spectralog 1/18/80
R-1 DDNLL 1/19/80
R-1 DDNLL 1/18/80
R-3 TDT-M 2/2/80
Y-1 CNL 2/3/80
C-14 Sidewall
Sidewall
......... __S~dewall
Sample Rac.2/ll/80
Sample Rec.12/4/79
Sample Rec.9/28/79
#1 5"
#1 5"
t~l 5"
~1 5"
~ 1 5"
#1 5"
!~ 1 5"
~tl 5"
~! 1 5"
~!]- 5"
~ 1 5"
19
Wall R, aqords
i ; . ; ,.;r
;. ,, ,. ,
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
STATE OF ALASKA ,-
Alaska Oil & Gas Conservation ~ort
3001 Porcupine Drive (')
Ancho-age, Alaska 99501
Att-~' i¥,I-. H. Hamilton
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
ARCO/EXXON/SFO
PHILLIPS/STATE
2/11/80 #013
REFERENCE: SOHIO DATA
.//q~e following material is ~ing submitt~ herewith. Please acknowled~ receipt by signing a copy of this le~er and returning it to this office:--
F-9 Magnetic Tape & Lis%ing 12/2/79 #60040
,, ,, ,, 4/28/79 #57035
,, ,, ,, 9/27/79 #57070
X-2 ,, ,, ,, 11/21/79 #60050
Well Records
RECEI
19
SOHIO ALASKA PETROLEUM COMPANY
February 11, 1980
Alaska Oil & Gas Conservation Cc~m~ission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
i--I
ANCHORAGE,~ I~K- ,--
ANCHORAGE, ALASK
Gentlemen:
Well R-6
(32-32-12-13)
Enclosed, in duplicate, is Form P-7, Cc~pletion
Report, for the above-named well together with
the Well History and Core Data Sheet.
This well hasbeenperforatedand is now on pro-
duction.
PRJ: ja
Enclosures
cc: Well File #17
Yours very truly,
SOHIO ALASKA PETROLEUM CO.
P. R. Judd
District Drilling Engineer
Form
SUBMIT IN DUPLI. CE*
. .
STATE OF ALASKA (See other In-
structions on
reverse side)
OIL AND GAS CONSERVATION COMMITTEE
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
WELLLJ DRY [~] Other
b. TYPE OF COMPLETION:
NEW WORK DEEP-I---] PLUG [---I DIFF.
WELL[X] OVER [] EN I I BACK.I I RESER.~] Other
2. NAME OF OPERATOR
Sohio Alaska Petroleum Company
3. ADDRESS OF OPERATOR
Pouch 6-612,. Anchoraqe, AK 99502
4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)*
Atsurface 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
At top prod. interval reported below
Attotaldept~904' s~n, 1422' WEL, Sec. 32, T12N, R13E, UPM
1848' SNL, 1166' WEL, Sec. 32, T12N, R13E, UPM
5. APl NUMERICAL CODE
50-029-20388
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28279
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
R-6 (32-32-12-13)
0. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil
11. SEC., T., R., M., (BOTTOM HOLE
OBJECTIVE)
Sec. 32, T12N, R13E, UPM
12. PERMIT NO.
79-52
9/11/79 9/27/79 1/28/80 KBE = 55.09' AMSL 21.31' AMSL
10688'MD 9537'TVD ~0'MD 9483'TV~ HOW MANY' 21. ROTARY TOOLSTotal ,NTERVALS DRILLED BY
22. PRODUCING INTERVAL{S), OF_THIS, i,op: COMPLETLON ]~0.I-0 i8, DltTjD T_OP ROI-TOM , N A %E9(~8. & tTVD TVD)* 23. WAS SURVEY DIRECTIONAL MADE
Prudhoe Oil Pool: Bottczn: 10,136'MD 9027"TVD Yes
Pool
24. TYPE ELECTRIC AND OTHER LOGS RUN
DIL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, SideWall Cores
_
25. CASING RECORD {Report all strings set in well)
CASING SIZE
20" x 30"
13 3/8"
9 5/8"
7"
26.
WEIGHT, LB/FT. / GRADE I DEPTH SET (MD)
Insulated ~ondu~or 110'
72g I Ir80/ 2661 '
47# L-80I 9740'
29# L-80 19227-10681'
LINER RECORD
HOLE SIZE I
36"
] 7~"'
12¼"
8¥' I
SCREEN (MD) r27.
CEMENTING RECORD AMOUNT PULLED
605 cu, ft. Arcticset
1384 cu.ft. C1~sG:130~
336 ~.ft. Class G
· TUBING RECORD
, ft. P~l~frost
SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* SIZE DEPTH SET (MD)
28. PERFORATIONS OPEN TO PRODUCTION (Interval, size and number)
10,018 '-10,028 ' BKB0.5"@4S.p.f. (Ref. BHCS/C=R9-27--7
10,038'-10,066'" " " " "
10,076 '-10,136 " " " "
7" 9294 '
PACKER SET (MD)
919] '
29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC.
~_ )_DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
30.
DAT./E-FIR ST PRODU(~TION
PRODUCTION
.
IPRODUCTION METHOD (Flowing, gas lift, I~umping~ize and type of pump)
I Flowing
DATE OF TEST.
FLOW TUBING
PRESS.
HOURS TESTED
CASING PRESSURE
CHOKE SIZE
CALCULATED
24-HOUR RATE
31. DISPOSITION OF GAS (Sold, used for fuel, vented, etc.)
PROD'N FOR OIL--BBL.
TEST PERIOD
OIL--BBL. GAS--MCF.
I'
IWELL STATUS (Producing or
sh"t"~roducinq
GAS--MCF. WATER--BB L. IGAS--OIL RATIO
I [
~ L_, l~..~..~'~', ~,~r-,l[BJiii~.v ~_.: D J OIL GRAVITY-APl (CORR,)
'.~,'~, I ...... ~ 1, ITESTW'TNESSEDBY~
32. LIST OF ATTACHMENTS
Well Histo~; Core. Da~ Alaska Oi! &
33. I hereby certify that thews complete and correct as determined from all
SIGNED ~, ---.-_ TITLE ~T._qrI~__TC'_rF _rl~TT,T,TlkT. G
*(See instructions and Spaces for Additional Data on Reverse Side)
DATE
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on all types of
lands and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in
other spaces on this form and in any attachments.
Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple com-
pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s)
(if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified,
for each additional interval to be separately produced, showing the additional data pertinent to such interval.
Item 26: "Sacks Cement": Attached supplemental records for this well should show the details of any multiple stage
cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval tobe separarely produced. (See instruction
for items 20 and 22 above).
,, ,
34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, 35. GEOLOGIC MARKERS
WATER AND MUD
NAME
MEAS. DEPTH TRUE VERT. DEPTI
BKB $~_~
Sag R. SST. 9848' 8711'
Shublik 9905 ' 8762 '
Ivishak 9995 ' 8844 '
36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS
AND DETECTED SHOWS OF OIL, GAS OR WATER.
See Attached Sheet
WE~,T, R-6 (32-32-12-13)
WELL HISTORY
September, 1979
Spud well at 1300 hours, September 11, 1979. Drilled 17 1/2" hole to 2700'.
Ran 67 jts. 13 3/8" 72# L-80Buttress casing to 2661'. Cemented with 3853
cu.ft. Permafrost II cement. Installed and tested BOPE. RIH to 2618', tested
casing. Drilled to 2727'; ran leak-off test. Directionallydrilled 12 1/4"
hole to 9750'. Ran 250 jts. 9 5/8" 47# L-80 Buttress casing to 9740'.
Cemented in tw~ stages: First stage with1384 cu.ft. Class G cement; second
stage through DVpacker at 2583' wi~h 130 cu.ft. Permafrost cement, preceded
by Arctic Pack. Cleaned out to 9682', tested casing to 3000 psi. Drilled out
to 9776', ran leak-off test. Directionally drilled 8 1/2" hole to 10688'.
Ran open hole logs and sidewall cores. Ran 36 jts. 7" 29# L-80 Buttress casing
to 10681'. Cemented with 336 cu.ft. Class G cement.
October, 1979
Cleaned out casing to 10630'. Tested casing %o 3000 psi. Displaced well to
NaC1. Ran CBL log. Ran 229 jts. ~~# L-80 AB-IJ-4S tub'.mng to 9294'. Landed
tubing with ball valve nipple at/~018!d Installed and tested tree. Displaced
tubing to diesel. Set packer a~-93zgi', tested tubing to 3500 psi. Released
rig at 1800 hours, October 4, 1979.
January, 1980
Pressure tested tubing and inner annulus. Rigged up Dresser Atlas and perforated
the following intervals using 3 1/8" guns @ 4 s.p.f.:
10,018-10,028 Ft. BKB (Ref. BHCS/GR, 9~27-79)
10,038-10,066 Ft. BKB (" " ")
10,076-10,136 Ft. BKB (" " ")
February, 1980
Closed in well in preparation for static pressure survey. ..Ran static pressure/
temperature survey at 8800 ft. TVDss. Set and tested insert sleeve and SSSV
in ball valve nipple ca. 2000 ft. Well put on production.
SOHIO ALASKA PETROLEUM COMPANY
February 7, 1980
3~ "c" S~'REE¥~ ' ! .... ':'"""" -.I
ANCHORAGE, ALAS~A__I 4 ENG-~
MAIL: POUCH 6-61~2--,-"q ,.-.~~
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupihe Drive~
Anchorage, Alaska 99509
Attn: Mr. H. Hamilton
Re: Well R-6 (32-32-12-13)
Enclosed please find, in duplicate, Form 10-403, Sundry. Notices and Reports
on Wells; and Form 10-404, Monthly Report of Drilling and Workover Operations,
for the above-referencedwell.
Very truly yours,
SOHIO ALASKA PETROLEUM C(IMPABDZ
District Field Engineer
Enclosures
CC:
S. Bundy
A. E. Leske
Drilling File
Form 10-403
REV. 1-10-,73
Submit "1 ntentlons" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT---" for such proposals.)
2. NAME OF OPERATOR
Sohio Alaska Petroleum Cc~pany
3~ ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, AK 99502
4. LOCATION OF WELL
At surface
729' NSL, 1400' ~L, Sec. 32, T12N, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 55.09' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20388
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28279
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit West
9. WELL NO.
R-6 (32-32-12-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 32, T12N, R13E, UPM
12. PERMIT NO.
79-52
)orr, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAI RING'WELL
FRACTURE TREATMENT ALTERING CASING
SNOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all ~rtlnent details, and give pertinent dates, Including estimated date of
starting any proposed work.
The following intervals were-perforated during January, 1980, using Dresser Atlas 3 1/8" guns
@ 4 s.p.f.:
10018-10028 Ft. BKB (Ref. BHCS/GR, 9-27-79)
10038-10066 Ft. BKB (" " ")
10076-10136 Ft. BKB (" " ")
A SSSV was run and tested in the ball valve nipple, and the well put on production.
(This space for Statl~'office use)
TITLE District Field Engineer DATE.
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE DATE
See Instructions On Reverse Side
Form N~). 10404
REV. 3-1-70
SUBMIT 1N DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
1.
WELL WELL OTHER
2. NAME OF OPERATOR
Sohio Alaska Petroleum Cc~pany
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, AK 99502
4. LOCATION OF WELL
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
5. APl NUMERICAL CODE
50-029-20388
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28279
7. IF INDIAN'ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
Prudhoe Bay Unit West
9. WELL NO.
R-6 (_32-32-12-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Ba¥-t Prudhoe Oil Pool
11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec. 32, T12N, R13E, UPM
12. PERMIT NO.
79-52
13.REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
January 23, 1980: Pressure tested tubing and inn0~.. 'annulUs.
January 27-28, 1980:Rigged up Dresser Atlas and perforated the following intervals using
3 1/8" guns @ 4 s.p.f.:
10,018-10,028 Ft. BKB (_Ref. BHCS/GR, 9-27-.79)
10,038-10,066 Ft. BKB (_" " ")_
10,076-10,136 Ft. BKB (" " ")
February 4, 1980: Closed in well in preparation for static pressure survey.
February 6, 1980: Ran static pressure/temperature survey at 8800 Ft. TVDss.
February 7, 1980:
Set and tested insert sleeve and SSSV in ball valve nipple ca. 2000 ft.
Well put on production.
14. I hereby ~ ~)
SIGNED eerti~the
NOTP-Report on this' {orm is requirod {or oach calondar month, rogardlo~ of tho ~tatus of oporations, and mu~t bo {dod in duplicato with tho
oil and gas ¢onsorYation committee by the l§th of the succc~ling month,unl~',s othorwiso direct~l.
,~T, R-6
SID~:-IAI3', COPE P~PORT
10633
19605'
1056O
10534
10523
10515
10438
10423
10367
10350
10305
i0270
-10251
10235
10225
10187
10177
10156
10128
10105
10075
10070
10969
10043
10034
10O0!
9959
9936
9825
10580
10570
10546
10505
10480
10460
10410
10390
10360
10325
10260
10220
10218
10216
10200
10180
10216
10200
lO!gO
10160
10146
10144
10142
10140
10138
PL:<~very
yes
yes
yes
yes
no
yes
yes
yes
no
yes
yes
yes
yes
no
yes
no
.ilo
yes
yes
no
yes
yes-
ilo
yes
no
no
yes
yes
ilo
yes
no
rio'
.
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
no
yes
yes
yes
no
Shale
~q~ndstone
Sanc~stone
Sandstone
Sandstone
Se~qdstone
F~3ndstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
S~ale
F~ndstone
Sandstone
Shale
Shale
Sandstone
Sandstone
Sandstone
Cla_v
.Shale
Sandstone
Sandstone
Shale
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
.~3ndstone
,~ndstone
Sand. stone
Sandstone
Sandstone
F~andstone
Depth
Recovery_
10120
10002
9997
9992
9908
9902
9804
9844
10578
10570
10523
10492
10470
10454
10434
10398
10380
10340
10315
10293
10280
10235
10214
10212
10193
10187
10146
10138
10114
10082
10065
10051
10040
10025
10015
10001
9970
9908
yes
no
yes
yes
D.O
yes
yes
yes
yes
yes
no
yes
yes
yes
yes
yes
yes
yes
yes
yes
.yes
no
yes
yes
yes
no
yes
yes
yes
yes
yes
yes
no
yes
yes
no
y.es
yes
Sandstone
Sand. stone
Sandstone
Sandstone
S_hale
Snale
Shale
Sandstone
Sandstone
Sandstone
S~ndstone
Sandstone
Sandstone
Sandstone
F~ndstone
Shale
~ndstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Fandstone
Shale
SOHIO ALASKA PETROLEUM COMPANY
January 7, 1980
I co~/'"
I coM,~ ~
3111 "C" STRE~
ANCHORAGE,
ANCHORAGE, ALASK, 99~0~ ENG
~ ~O~OL
I ~
--I'~-s
~1 STAT TEC
~t-STAT TECj
CONFER:
~ ....
........
~1[~:
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99509
Attn: Mr. H. Hamilton
Re: Well R-6 - (42~32-12-13)
Gentl~:
Please find enclosed, in triplicate, Form 10-403, Sundry Notices and
Reports on Wells, for the above-referenced well.
Very truly yours,
GJP :mLh
Enclosures
cc: S. R. Bundy
A. E. Leske
Drilling File
SOHIO ALASKA PETROLEUM COMPANY
g
District Field Engineer
Form 10-403
REV. 1-~0-73
·
Submit '1 ntentions" In Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for 13roDosals to drill or to deepen
Use "APPLICATION FOR PERMIT--~' for such Droposals.}
2. NAME OF OPERATOR
Sohio Alaska Petroleum Ccmpany
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, AK 99502
4. LOCATION OF WELL
At su trace
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
55 KBE' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20388
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28279
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit West
9. WELL NO.
R-6 (42-32-12-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bayt Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 32, T12N~ R13E~ UPM
12. PERMIT NO.
79-52
sort, or Other Data
NOTICE OF INTENTION TO--
TEST WATER SHUT-OFF E~ PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other)
SUBSEQUENT REPORT OF-'
WATER SHUT-OFF ' E~ REPAIRING WELL
½
FRACTURE TREATMENT ALTERING CASING
SNOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work.
~ne follc~in9 intervals will be perforated during january/February, 1980 ~ using Schlumberger's
2 7/8" guns @ 4 s.p.f.: 10018 - 10028 ft. BKB (Ref. BHCS/GR 9/27/79)
10038 - 10066 ft. BKB (" " ")
10076 - 10136 ft. BKB (" " ")
A SSSV will be set and tested in the ball valve nipple ca, 2000 ft.
16. I hereby certi h the foregoin s true'and correct
SIGNE
DATE
TITLE
DATE /- //-~ d
I~Y ORDER OF THE COMMISSION
See Instructions On Reverse Side
[~.~pproved
.~: Returned
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
soHIO-BP ALASKA PRODUCTION DIVISION
TO:
STATE OF AL,:,$:<A
Al.".ska Oil & Gas ConServation
8001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H, Hamilto~
3111 "C"STHEET
ANCHORAGE, ALASKA
TELEPI4ONE (907} 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
October 31, 1979
State/Unit/P&p
REFERENCE; Well Data Transmission
Ilowing material is being submitted herewith. Please acknowledge receipt by signing a
.6/ copy of this letter and returning it to this office:-
Logs for the following wells:
.R~.5 CPL Run 1'
............. Temp Run
G-6 Spinner Run 1,2
CNL Run 1
'G-7 CNL Run 1
QjonthlyWell Test Summary Report - September
Q-7Q-4Q-6Q-5-7 Bottom-Hole Transient ,,'"' Pressure pressure'""' ' ' & Data Flowmeter Spinner ,," _ Data Data/Data,,,, Packet '""' Packet ,,'"'
9,~9/79
9/15/79
9/6/79
9/16/79
9/24/79
Colette Tracy ~/
Geological Aid L/
SOHIO PETROLEUM COMPANY
Division of Sohi~ Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
October 24, 1979
,.
CC" :" .':, ".
( ~C,.",~,' "/ '
__~I ;':::-:., t~i~' 3111"C"STREET
-. ANCHORAGE, ALASKA
:~ 7 ~ TELEPHONE (907) 265-0000
.... - -: ~~C~OR~G~, ~[~S~
Alaska Oil & Gas Conservation ~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well R-6 (32-32-12-13)
Enclosed, in duplicate, is Form P-7, Completion Report,
for the above named well together with the Well History,
Well Imgs, Directional Surveys, and Sidewall Core Data.
This well has been suspended pending perforating operations.
PRJ: ja
Enclosures
cc: Well File #17
C. Tracy - Geology
Yours very truly,
SOHIO PETROLEUM COMPANY
District Drilling Engineer
-7
SUBMIT IN D[
- .STATE OF ALASKA
01L AND GAS CONSERVATION COMMITTEE
In-
stru,.,,ons on
reverse side)
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
WELLI I DRYr'~ Other
b. TYPE OF COMPLETION:
NEW ~ WORK DEEP-[~I PLUG [~1 DIFF.
WELL~_I OVER [~ EN I I BACK-I I RESER.[-~ Other
2. NAME OF OPERATOR
Sohio Petroleum Company, Div. of Sohio Natural Resources Co.
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage: Alaska 99502
4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)*
0/lit;I/VA/.
5. APl NUMERICAL CODE
50-029-20388
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28279
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
9 WE. LL NO~.
(~-6 (32-32-12-13)
10. FIELD AND POOL. OR WILDCAT
Prudhoe Bay,Prudhoe Oil Pool
At surface
729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM
At top prod. interva~ reported below top Sag R. SST.
1922' SNL, 1492' WEL, Sec. 32, T12N, R13E, UPM
At total depth
1848' SNL, 1166' WEL, Sec. 32, T12N, R13E, UPM
1. SEC., T., R., M., (BOTTOM HOLE
OBJECTIVE)
Sec. 32, T12N, R13E, UPM
12. PERMIT NO.
79-52
13. DATE SPUDDED9/11/79 [14. DATE T.D. REACHED9/27/79 1115' DATE COMP' SUSP' OR ABAND'10/4/79 116' ELEVATIONS(DF' RKB' RT' GR' ETc)*~ =r'55! 09 ' AMSL [17. ELEV. CASlNGHEAD21.31, AMSL
I OI2 21'. ROTARY TOOLS
DEPTH HOW MANY* CABLE TOOLS
10688'MD 9537'TVD 10630'MD 9483'TV~ I Total
22. PRODUCING INIERVAL(S), OF THIS COMPLETION -- TOP, BOTTOM, NAME (MD & TVD)* 23. WAS DIRECTIONAL
SURVEY MADE
None
Yes
24. TYPE ELECTRIC AND OTHER LOGS RUN
DIL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, Sidewall Cores
25. CASING RECORD (Report all strings set in well)
CASINGSlZE WEIGHT, LB/FT. / GRADE / DEPTH SET (MD) HOLE SIZE
20"x30" '_nsulated C~nducto~ 110' 36"
13 3/8" 72~ ! L-80 ! 2661' 17½"
,, 5/8" , 47# ! L-80 / 9740' 12~"
i29~ ! L-80 19227-10681' 8~"
26. LINER RECORD
SIZE TOP (MD) BOTTOM (MD) sAcKs CEMENT* SCREEN (MD)
28. PERFORATIONS OPEN TO PRODUCTION (Interval, size and number)
None
CEMENTING RECORD
605 cu.ft. Arcticset
3853 cu.ft. Permafrost
1384 cu.ft. Class G~: 130
3~6 c~.ft. Class G
27.
SIZE
,,
TUBING RECORD
DEPTH SET (MD)
9294'
AMOUNT PULLED
cu.ft. Pen~afrost
PACKER SET (MD)
9191'
29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
30.
PRODUCTION
DATE FIRST PRODUCTION
DATE OF TEST. ]HOURS TESTED ]CHOKE SIZE ] PROD'N FOR
TEST PERIOD
PR ESS. 24-HOUR R_ATE
31. DISPOSITION OF GAS (5old, used for fuel, vented, etc.)
IPRODUCTION METHOD (Flowing, gas lift, Dumping--size and type of pump) [ WE LL STATUS (Producing or
shut-In)
OIL--BBL. GAS--MCF. WATER--BBL. I GAS-OI L RATIO
GAS--MCF.
32. LIST OF ATTACHMENTS
Well History, Well Logs, Directional Surveys, Sidewall Core Data
33. I hereby certify that the f .o~ attached information is co~nplete and correct as determined from all available records.
SIGNED -- -r/~ TITLE District Drilling Engineer
F. 1-(,
*(See instructions and Spaces for Additional Data on Reverse Side)
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on all types of
lands and leases in Alaska.
Item' 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in
other spaces on this form and in any attachments.
Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple Com-
pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s)
(if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified,
for each additional interval to be separately produced, showing the additional data pertinent to such interval.
Item 26' "Sacks Cement"' Attached supplemental records for this well should show the details of any multiple stage
cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction
for items 20 and 22 above).
34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS,
WATER AND MUD 35. GEOLOGIC MARKERS
NAME
MEAS. DEPTH TRUE VERT. DEPT
BKB Subsea
Sag R. SST. 9848' 8711'
Shublik 9905 ' 8762 '
Ivishak 9995 ' 8844 ' '"
36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS
AND DETECTED SHOWS OF OIL, GAS OR WATER.
See attached sheet.
W~.T. R-6 (32-32-12-13)
September, 1979
Spud welI at 1300 hours, September 11, 1979. Drilled 17 1/2" hole to 2700'.
Ran 67 jts. 13 3/8" 72# L-80 Buttress casing to 2661'. ~ted with 3853
cu. ft. Permafrost II c~n~nt. Installed and tested BOPE. RIH to 2618', tested
casing. Drilled to 2727'; ran leak-off res%. Directionally drilled 12 1/4"
hole to 9750' Ran 250 jts~ 9 5/8" 47~ L-80 Buttress casing to 9740'.
Cemented in ~ stages: First stage with 1384 cu.ft. Class G cement; second
stage through DV packer at 2583' with 130 cu. ft. Permafrost cement, preceded
by Arctic Pack. Cleaned out to 9682', tested casing to 3000 psi. Drilled out
to 9776', ran leak-off 'test. D~ectionally drilled 8 1/2" hole to 10688'.
Ran open hole logs and sidewall cores. Ran 36 jts. 7" 2.9# L-80 Buttress casing
to 10681'. Cemented with 336 cu. ft. Class G cement.
October, 1979
Cleaned out casing to 10630'. Tested casing to 3000 psi. Displaced well to
NaC1. Ran CBL-log. Ran 229 jts. 7" 26~ L-80 AB-IJ-4S tubing to 9294'. Landed
tubing with ball valve nipple at 2018'. Installed and tested tree. Displaced
tubing to diesel. Set packer at 9191', tested tubing to 3500 psi. Released
rig at 1800 hours, October 4, 1979.
10633
10605
10560
10534
10523
10515
10438
10423
10367
10350
10305
10270
10251
10235
10225
10187
10177
10156
10128
10105
10075
10070
10560
10043
10034
10001
9959
9936
9839
9825
10580
10570
10546
10505
10480
10460
10410
10390
10360
10325
10260
10220
10218
10216
10200
10180
10216
10200
10180
10160
10146
10144
10142
10140
~v~38
SIDE?-~I,I, COPE
Recove .ry
yes
yes
yes
yes
no
yes
yes
yes
no
yes.
yes
yes
yes
no
yes
no
no
yes
yes
no
yes
yes
no
yes
no
no
yes
yes
no
yes
no
no
yes
yes
yes
y~
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
no
yes
yes
yes
no
Shale
Shale
Sandstone
Sandstone
Sandstone
Sandstone
Sea~dstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Shale
Fx3ndstone
Sandstone
Shale
Shale
Sandstone
Sandstone
Sandstone
Sandstone
Clay
~gnale
Sandstone
Sandstone
Shale
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
~3ndstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Depth
Recovery_
.-. .
'Lithology
10120
10002
9997
9992
9908
9902
9804
9844
19578
10570
10523
10492
10470
10454
10434
10398
10380
10340
10315
10293
10280
10235
10214
10212
10193
10187
10146
10138
10114
10082
10065
10051
10040
10025
10015
10001
9970
9908
yes
no
yes
yes
yes
yes
yes
ves
y~
no
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
no
no
yes-
yes
yes
no
vas
yes
no
yes
yes
Sandstone
?~3ndstone
Sandstone
Sandstone
S_hale
Snale
Shale
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
S~nds~One
Shale
~ndstone
Sandstone
Sandstone
Sandstone
Sandstone
'Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Sandstone
Shale
Sb_s] e
spar, r j-sun
· ~
J, A. Fouch~
President
~. Gary Plisga
3bio-BP, Alaska
3111 C. Street
Anchorage, Alaska
99503
Re:
',,'?~/f~
COpk
Our BossGyroscopic Survey
Job No. Boss-16457
Well R-6
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: October 11,
1979
Dear Mr. Plisga:
Please find enclosed the "Original" and sixteen (16) copies of
our Boss Gyroscopic Multishot Directional Survey on the above
well.
Thank you for giving us this opportunity to be of service.
Yours very truly,
SPERRY-SUN, INC.
Ken Broussard
District Manager
m/aw
Enclosures
.~3HIO FP
P PUP., ~ CE
ALASKA
ALASKA
r' P CDU, C T I CN
)
FPEr:'RY-SUN NELL SLI[,;VEYING
ANCtiORAG£, ALASKA
DIVISION
CCFPUTATION DATE
CCTOgER 15, 1979
C 0 f'" P/~ N Y
DATE OF SURVEY OCTOBER
PCSS GYROSCOPIC SURVEY
dC8 NUNBER EOSS-16q57
KELLY BUSHING ELEV. =
55.07 FT.
C
200
.t 00
f O0
700
1CCO
1100
1200
1300
Ia OO
1500
1EOO
1700
1F O0
1960
2[00
21 (; [1
~CO
2r-C0
30gU
TRUF
VEFTICAL
FEPTP
1C'0.00
200.00
300.00
~,O0.O0 '
~:. CC CC
.~ ..,., . ...,
(.c~,
e,?9.99
11~9,C9
1~99,98
1~9,98
1799,~7
1899.97
~9.~7
2C~9.97
2~.~6
23~9.81
2499.71
2705.~0
SUF~ -SE A
VEPTIC~L
D E F T H
144'91
24A.ql
344.91
444.91
5q4.90
644.00
744.00
~.90
S4~.90
104~.90
12~.9~
,15~.8~
l~a.8%
17~.8P
19a4.~8
20~4.~8
21q~.e7
22~4
~7~4.=1~,
COURSE COURSE
INCLINATION DIRECTION
[;ECG ~IN DEGREES
0 ' k O. 0 EL
8 'S 6~+.69 E
7 S =6.65~, W
12 S q7.29 w
19 S 60.60 W
20 S 30.29 W
19 S 2~.50 W
17 S 0.29 k
16. S 23.60 F
15 S 38. 0 E
7 S 46.60 E
13 S 36. 0 E
23 S 46,1.0 E
27 S 49. 0 E
19 S 59.19 E
20 S 29.~0 E
26 S 29.19 F
2(, S 46.39 E'
12. S E2.69 F
16 S 7a,19 W
15 S 86."c.;. W
26 N ~.,E9 F
~ N 81.56 E
20 S 72.19 E
~3 S 6~ .50 E
20 S 63.19 E'
2~. S ~'~4. 0 E
~9 S 26. 0 F
2 S 3~-~. 0 E
1° $ 70.1c E
55 .g 85.69 E
DOG-LEG
SEVERITY
F'EG,/IO0
O.O0
.14
.2~
.07
.1~
.18
.02
.16
.12
.07
.12
.lO
.17
.07
.16
.17
.10
.13
.26
.~5
.06
.70
1.~1
,51
,~7
1.23
.40
.71
3.20
1.F2
TOTAL
RECTANGULAR COORDINATES
NORTF/SOUTH EAST/WEST
0,00 0"00 ....
· 05 S .11 E
· 17 S ,13 E
· 35 S .I0 W
· 61 S .~8 W
1.00 S .88 W
,
1.50 S 1.16 W
2.00 S 1.30 W
2.~7 S 1.21 W
2.86 S .98 W
3.11 S .76 W
3.35 S .56 W
3.75 S .20 W
~.2q S .35 F
~.65 S (~,. .89 E
-
E,05 S 1.28 E
5,6~ S ~'"~t 1.61 E
6.25 S r'r~ 2,08 E
6.60 S .L~'"~). 2.53 E
6.75 S r~ 2.q7 E
6,83 S'-..~'~'~ 2,02 E
la. lq.56 E
13, S 17.60 E
17.~ S 1~.83 E'
21."~'~'~ S 22.a8 E
25.14 S 2g.a~ E
27.10 S 3F,.O0 E
VERIlCAL'
SECTION
O
-.C~
-.77
-1.33
-1.89
-2.33
-2.66
-2.71
-2.73
-2.7~
-2.7c
-2.7~
-2.65
-2.66
-2.8~
-2.93
-2.87
-3.02
-3.3~
-3.2~
-2.1~
-.~1
1.3~
2,77
3.00
1,84
,77
2.a4
7.g0
SCP
R-6
PRUDHOE
ALASKA
~, L A S K ~
~ ,~ Y
PP, CDL'CT ICk r'?
SPERRY-SUN WELL SURVEYING
ANCHCRAGE~ ALASKA
CO~P'UTATICN DATE
OCTOBER 15, 1979
COMPANY ' PAGE 2
DATE OF SURVEY OCTCBER 11, 1379
RCSS GYROSCOPIC SURVEY
JOB NUMBER BOSS-16457
KELLY BUSHING.ELEV, = 55.09 FT.
MFASLREC
DEPTH
TRUE SUP_ -SEA
VERTICAL VERTICAL
C E F TH DE P TH
3100
3200
3300
3400
3500
3600
3700
ZBO0
.3500
4000
4100
· 4200
/+300
4400
4.500..
4600
4700
4800.
~SO0
5C00
CCURSE ......... CCURSE
IKCLIh, ATION DIRECTIOK
PEG MIN DEGREES
5100 .... 4882.5.5
5200 4963.01
5300 5043.06
5400 5122.78
5500 52C2.06
5600 52EO.SE.
5700
5800 5437,F. 4
5900 5.r'l 5.77
6GOO ~'553.6.
6160 5671
3098.05 3042,96
3]97.08 3141.9S
3~$5,47 3240,38
3353,04 3337,95
3~69,88 3434,79
3585.77 3530.68
36,80.45 3625.36
3773.8~ 3718,74
36~5.60 3~10.71 .
3956.48 3~01.3~ 25
4045,47 3990.38 28
~132.16 4077.07 31
4216.97 4161.~8 32
4301.18 4246.09 32
4~E5,!1 ., 4330.02 33
~4E8.87 441= 78 3=
4552,81 4497,72 32
4636,55 4581,~6 33
4719.65 4664.56 34
~801.66 '~7~6.57 ~5
4827.50 36
~907.92 36
4987.97 36
5067.69 37
514~,97 37
5225.90 37
530~.5~ 38
_ .
5382,75 38
5460,68 38
~=8,~ ~8
5616,2~ 39
9 22 N 60.20 E
11 ....... 26 .......... N .... 38.59 F'
13 45 N 36,59 E
15 3 N 36.50 E
17 52 N 37, 9 E
19 39 N 37.29. E
22 10 N 37. 0 ~
24 1 .N .~38, 9 E
48 N 38.29 E
26 N 38. 0 E
20 N.3Z.,29 E
37 N 37.29 E
35 k 37.50 E
12 ..... ~.,37.59 E
1 N 37.70 E
48 N 37.70 E
27 .... N~38,20 E
,7 N 38.29 E
~0 N 39.=0.. E
16 ............. k_.39.5~ F
39 N 40.50 E
58 N 41,70 F
17 N 42.50 E
47 N 43, 0 F
58 N 43,A0 E
17_ N 43.20 E
50 N A3, 0 E
~6 N 43. 0 E
57 k 42.70 E
2 N 42.70 E
DOG-LEG
SEVERITY
BEG/lO0
TOTAL
RECTAkCULAR COORDINATES VERTICAL
NORTF/SOUTH EAST/WEST SECTIOk
1,90
3.67
2.35
1.30
2.81
1.79
2.52
1.90
1.78
21.07 S 61,54 E 28,7/+
9,27 $ 74,81 E 46,q7
8.04 N 88.0$ E 68.0S
27.98 N i02.98 E 92.71
50.61N .......... i2,P_,_.O~ .... ~ ....... !20.77
76.23 N 139,~9 E 152.63
10q,68 N 161.0~ E 187.9~
1.~5.78 N ..........18q...,..~? .... ~ 226.87
168,8~ N 211,02 E 268.70
2.63 204.7q N 239.18 E 313.9~
2.92 244.20 N 269.61 E 363.35
1.29 286,33 N 301,70 E 415.~3
· 11 32~.18 N 33A.A6 E q69.27
· 56 372.28 N 367.59 E 523.16
,19 415.54 N~ A00.97 E 577.3~
· 22 ~58.5~ ~ q3q.20 E '631.2~
· 71 501,6q ~ ~67.82 E 685.46
.66 ........5A .32rYf_ ........... 7 o.6e
· 59 63..12-~;~_~-'~ 575.59 E 656.01
.66 ............. ......... 915.21
· 58 770 · 5~-'~NL~ 693,70 [ 1035,28
· 30 860.~~ 777.,0 E
· 07 996~ N 90~.78 E
· 09 1088.62 N 990.14 E 1~69.75
SOHIO BP
F'RUCPCE
ALASKA
ALASKA
GAY
PRODUCTION
·
SPERRY-SUN WELL SURVEYING COMPANY
ANCHORAGE, ALASKA
~'l ........................... D A T E 0 F .S. U~.V_E Y O.C.? O.B.. E,R....11,
COMPUTATION DATE BOSS GYROSCOPIC SURVEY
CCTCDER 15, 1979
1979
deb NUMBER BOSS-16457
.............. K.E.L.Ly ..... BU.S._H ! NG__E.LE..v ·. = 55.!9 F T.
ME'XSU
[DEPTH
RED
TRUE
VERTICAL
PEPTH
SUP-SEA COURSE COURSE
VERTICAL INCLINATION DIRECTION
DEPTH DE'G FIN DEGREES
DOG-LEG
~EVERI'TY
DEG/iO0
,TOTAL
RECTANGULAR COORDINATES VERTICAL
NORTI-/SOUTH EAST/WEST SECTION
~,2o
630
64.0
6.5O
660
670
,,
7O0
71,0
720
730
740
75O
.....
770
0
0
0
0
0
0
0
0
O
0
0
0
0
0
0
0
57As.is .... SGs4.,iO
5827.42 5772.31
ssos.s7 585o.85
5984,86 5929,77
6064.01 6008,92
614~,.2~ ............... 6088,16 .......
6222,5~ 6167,44
6~01.55 6246,84
6460,9E, 6405,87
f~AO,E1 6485,52
6620,55 6565,26
6700,51 6645.22
6780.51 6725.42
6861,19 6806,10
....
6~42.46 6887.37
7800 7024.:~ 656.9.24
!.%.00 ........ 710.6.~: ...... 7051,74
8000 718~.=7. ., 71*A.48
8100 7272,4~ 7217.35
8200 7355.32 7300.23
................
8~00 74~8,8~ 75~3,76
8400 7523.22 746f;.13
PSO0 7607.67 7552.58
P600 7691,69 7636.80
e700 7775.98 7720,~9
8PO0 7860,15 7~05.06
....
HSO0 7C~A,P2 7~85,75
9000 803C.49 7975,40
~20'0 ' 8202.41 8147,52
37
37
~7
57 52 N 38,59. E ,57 1~Z~o70 N 1275o6~ E 1900,0~
~7 19 N 37.90 E .A7 1A61.A3 N 1311.27 E 1960.38
$7 22 ........ N_.37o20,,E .~3 15..09,55 N ..... 1~4..8.t.~.5 E .............2020,51
37 15 N 36,40 E °50 1558o06 N 13f14°56 E 2080o49
37 9 N 36, 9 E ,20 1606.8~ N 1420,31 E 2140.23
36 A5 N 35.29 E .43 1704.54 N 1~90.66 E 2259.03
36 3~ N 55, 0 E ,25 17~,~? N 1525o04 E 2517,R~
35 50 ............ N ~¢.°~0 E , °8i 1¢~.~°9~ N 1558,68 E 2575,95
55 26 N 3~. 0 r .¢7 ............. ~"~.IA 'N ........159'1'-A3''~ ....
~4 ~7 ~ 33.40 E .88 tg"R.?.90 N 1625.29 E 2489.A4
38 21 N 42.20 E .51 1180.63 N 1074.82 E 1594.6~
3.8 .6 ...... ~ ..... ~..!?~ E ........ .~5 ......... !~._2~.~.,f%...~ ................... !!!6..,.15 ..... ~ ..................... 1656.48
43 N 40.90 E .58 1272.89 N 1156,67 E 1717.79
37 N 40.20 [ .4A 1319.33 N 1196.~0 E 1778,71
33 N 39 20 E 61 13E6,27 N 1235,37 E ....... 1,.839,44
34 12 N 33. 0 E
~ ....... ~ ........... ~--~'~';"7~ E .... .z'~ ........ iq~~"~"-'~ ......... i68~'.'~'-~ ............. ~.6~
33 55 N 32,40 E .31 ~~0 N 1714.90 E 265~.28
3~ 7 N 32,A0 E °19 ~,~8.~,'"'~A N 1744.88 E 2708.86
32 18 N 41.40 E 1.48 ~"~1~,57 N 1811,31 E 2816,~5
:2 27 k A2,,0 E
32 44 N 45. 0 E .87 ~'~0.70 N 1921.49 E 2977.95
30 26 N 48.~0 E 1,44~ 2395.68 N 2036.92 E 3136.61
50 .... 5! ...... N ~9,90 E .77~ 2~52,86 N 2075,29 E 5t87,2~
,~,.'HIO BP ALASKA
F', - 6
PFUEHCE E'4Y
,~L/~ SK A.
F; P. C Dt.iC T I ON
SPFPRY-SLN WELL ~'UPVFYING
ANCHORAGE,~ ALASKA
DIVISION
CCFPUTATION DATE
CCTCPER 15,' 1979
CONP/~NY
) pAG'E' 4
DATE OF SURVEY OCTOBER 11,
BOSS GYROSCOPIC SURVEY
dC~ NUMBER BOSS-16457
KELLY BUSHING ELEV, = 55,09 PT,
..... TRUE COURSE .. CO
MEASURED VERTICAL INCLINATION DIR
[![PTH [' EPTH NIN GE
SUH-SEA URSE DOG-LEG
VERTICAL ECTION SEVERITY
DEPTH DEG GREE°
,~ DEG/IO0
· ,
~300 82~!7.54 8232.85 31 0 N 5A.29 E 1.A1 2
9500 460.58 840, ,.49 29 20 .N. 58o O,.E 1.57 2
~600. 8=47.c~~ .,., 8qq2.86. 28 ~z.. N 60. 9 E 1.12 2,.
9700 8635.5~ 8520.z~5 28 ~7 k 62.79 E 1.31 2
9800 8723,51 ..... 8668,42 ....... 28 1 N, 6.8, ....... 0 .... E ......... 2,59 2
9500 ~812.86 8757.77 25 24 N 76.19 E 4.51 2
10000 8903.46 8848.37 2a 40 N 75.59 E .78 2
10100 899A,53 8939,4A 2~ 6 N 7_6.,.80..E .......... ,75 2
10200 6586,0£ 9030,93 23 31 N 77,80 E ,71 2
10300 9177.~5 9122.90 22 41 N 79.69 E 1.12 2
.... 1.0400 9270.55 9215.46 21 47 bi 79..90 E ........... .89 2
10500 c~6u.2: qz08.16 22 13 N 78.19 E .77 2
10600 c4"~,"E. ~ .. 9400.47 2~., O N 7~,"9~ ~ E 1,26 2
*106.14 ....... 9468,45 .... 9.A13.3~ 23 0 ........~.__7.5,.5~ E ...... ,03 2
*10~e~ 95~6.57 9~81.~8 2~ 0 N 75.59 E .00 2
TOTAL
RECTANGULAR COORDINATES VERTICAL
NORTF/SOUTH EAST/WEST SECTION
HORIZONTAL DISPLACEF'ENT = 3830.10 FEET AT NORTH, ~+5 DEG.
5 5.82 N 2198. z E 3340.05
.553,05...N .............. 22A0...!5 ~ .............. 3388.84...
578.08 N 2281.86 E 3436.06
601.1~ N 232A,23 E 3A82.3~
620,94 N ................. 2367...~ E ................. 3526,9'~
634.87 N 2410.08 E 3566,98
G45.17 N 2q5].1'2 E 3603.34
655.03,...N ............2.491,22.F 3638.70
..
6~.91 N '25S0.61 E ~672.88
671.57 N 2569.09 E 3705,5~
678,28..N ........ 2606,35...E 3736,68
685.~0 N 2643.14 E 3767.7¢
N 2680.5s E ssoo. 7
7~'1,69 N 27~3.89 E 3830.10
7 MIr~ EAST AT MD : 10688
Tt-E C~LCULATICN FROCECL:RFS aRE DASEE CN THE USE OF THREE DIMENSION4
*LINEAR EXTRAtYDLATION
5. ~"i ! 0
F', - 6.
PRUEPCE
ALASKA
;x L A El K A
P AY
PRODUCT I ON
SPFpRy-~LFN W~[L" SUFVEYING COMPANY
ANCHORAGE, ALASKA
CCPPUTATiON' DATE
CCTCDER 15, 1979
DATE OF SURVEY OCTOBER
JCB NUMBER BOSS-16A57
KELLY BUSHING ELEV. =
PAGE 5
55."09 FT.
INTERPOL~TEC VALUES FOR E.VEN 1000 FEET OF ~EASL!RED DEPTH
TRUE
P~E~SUREC VFRTICAt
BEPTF CEPTF
SUB-SEA TOTAL
VERTICA.'L, REC.TAKGULAR .... COORD!.NATFS MD-TVD
EEFTP NCRT'F/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
0 0.00
I 000 o99 · 99
2000 ] 9 ,u. 9 · E~7
3000 2998,65
~006 3556.48
50 O0 4 ~01
60 O0 ..5,5 =,3.63
7000 6381.A3
8000 71R9.57
9000 E',C30.4.c,
10000 8co~.A6
10688 $536.57
-55,09 0.00 0,00
9~A.90 3.11 S .76 W
19~4,88 6.83 S 2.02 E
29.~3,,5,6 27..10.S .............. 38,00 E
3501.35 168,89 N -211.02 E
4746,57 585.83 N 538.18 E
5.538,54 ].042.36 N 94~,.95 E ....
6326.34 1509.53 N 13A8.25 E
7134.48 1992.34 N 168~.7A E
7975.40 23S9,65 N 2036.92 E
8848.37 2645.17 N 2451.12 E
9481,A8 2702,69 N 2713,8g E
THE'-'C'ALCUL~TION PROCEDURES ARE
BASED ON THE' 'U§E .... OF
0.00
· 01 .01
· 03 ,02
i....35 .................. 1.._~2 ..............................
~3,52 42,18
198,34 15~,82
~06.37 208.03
618.57 212.21
810.~3 191,86
969,51 159,08
1096.5~ 127.03
1151,43 54,89
THREE DIMENSIONAL,=-~ADIUS' OF
'"'1'1
C~,
CURVATURE ME.~HOD'
PRUDHOE E. AY
ALASKA
SPERRY-SUN WELL SURVEYING COMPANY
AkCFORAGE, ALASKA
F'RCDLCTION DIVISICN BATE OF SURVEY OCTOBER 11,
'' coyPuT,ATio~i 'D AT~'E
OCTOBER 15, 1979 dOB NUMBER BOSS-16457
KELLy : .55,09
FT.
INTERPOLAT.ED VALUES FOR EVE. N .... 1.0.0 ..... FEET OF' S. UB-SEA. BEF. TP'.
TRbE
Y£ASURED VERTICAL
DFPTH DEPTH
SU[!-SEa TOTAL
.V E R T I .C A L,. F~ E C T A N G U L A R C.O 0 R.D ! N $
CEPTH NORT~t/SOUTH EAST/W
TES MD-TVO ............. V E R_T I.C_A.L
EST DIFFERENCE CORRECTION
0 0,.00
56 ~':5 · Cc
...,
155 155,05
r 2.95 ;.55.05
$55 ~55.~S
~55 ~55.09
.......... ~.., . ..,
655 6~5.0c,
7-r. 7~5.0c
............ ~55 E55. O~
~55 ~55.09
1055 1055.09
-55,.09
0-00
100,00
200,00
300,00
qO0',O0
500,.,00
600.00
700,00
~00.00
900,00
1000.00
.11_5.5 ........11~5,05.. 11
1255 1255,C5 12
1355 1355.07 13
1A55 ........ 1455.07 14
1555 1555.09 15
1655 1655.05 16
1755 .... 1.7_5.5,05 ..... 17
0.0,00
00,00
O0,O0
00,00
00,00
00,00
00,00
0,00 ...................... 0,.0
· 01 S .02 E'
· 11 S ,20 E
· 2A S ......... ,02. E
· q8 S .26 W
,78 S .7~ U
1,28 S .................. 1,0q W
1.77 S 1.29 W
2.27 S 1.29 W
2.70 S 1.10 W
3,03 S ,8~ W
3.21 S
3.5~ S .ql W
4.01 S .08 E
4,52 S .67 E
~.83._.S
6.00 S 1.83 E
6.52 S 2.38 E
0 ........... Q..O0
· 00 .00
· 00 .00
......... · .0.0 .............. .00
· 00 .00
· 00 ,00
.......... .00 ......... .o0 ...................................
· 01 .00
· 01 ,00
,01 .00
· 01 ,00
· 01 .00
,01 ,00
· 01 .00
.02 f~ .00
· 02 =--I
· 02 m ~ ,oo
.o3 .0 C__.) .oo
_I ...... :- .'.-'-~ .............
. . ~
SPERRY-SUN WELL SURVEYING COMPANY PAGE 7
ANCHORAGE,~ ALASKA
....... S OH,I 0 .... D.F ........ A,,LAS E A PR 0 DU CT I ON DI,V.,!,..SION p.A.,,?E. ...... PE..,..~.URV_,..E._.Y..._O_C_,T,,D..D..E._~ .... !.,,1,, .... 1..9,.:19 .- ........
R,-6 COMPUTATIOD~ DATE
PRMEHGE E~AY OCTOBER 15, 1979 JCB NUMBER BOSS-16A57
............~.L..A S K,,.A
INTERPOLATEC VALUES FOR E'VEN 100 FEET OF. SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
~.E A S U.R_E.~ .VE.~ .T..! C.A...k ............... ~,..E..R3.._I..q,...A L_..., ............ .......... ~_D,'..T.Y._D_ ...................... .V. ~_.R_T__I C__A_~L ......................
DEPTF gEPTH DEPTH NCRTH/SOUTH EASI'/WEST DIFFERENCE CORRECTION
ie55 i955.0~ 1900.00 6.82 s ~.22 E .03 .00
2055 2055.09 2000.00 6.8~ S, 1.87 E .03 .00
............................. 2..!..5.5 ................... 21.55..,. 0..9.. .................. 210.0 ,.00
2255 2255,09 2200,00 6,58 S A,80 E ,06 ,02
2355 2355,C~ 2300,00 7,85 S 8,68 E ,lA ,08
2655 2655,09 2600,0
2855 2F~55,05 2800,0
2555 2555,09 2500,00
0
0
0
,00
,00
,00
3258 3255,09 3200.00
3360 ~355,09 ~300.OO
3463 3A55,05' 3AO0.O0
3567 3555.0S 3500.00
3673 3655,09 3600,00
29=6., 29:5,05. 2900
3056 3055,09 3000
3157 3155.09 3100
11.85 S 16.fl9 E .34 .09
15.46 S 1R.92 E .~3 .10
19.63 S 21.06 E
~'3';65 S 25 ; ................................................. 18
26,72 S .33,52 E 1,12 ,40
27,28 S 43,92 E 1.66 ,55
23,98 S 55,80 E 2,~3
15.01 S 69.56 E 3,79
.............. ? ~ ~..,_A ..... ~ ......... ~.?.'-~.-.-~ .................... ~' ~5 ..............
20.4~ N 97,36 E 8.~
42.95 N 11A.25 E
69 ~..0 ~_~
.......... ~.3~...._00.[ ...................
,77
1,36
2,05
3.88
5.23
SC,.~,IO F'P
R - 6
PFUDHOE
~"~'~'~"R'~"S'~'N w'~'L"L" SURVEYIN6 COMPANY PACE
ANCHORAGE, ALASKA
AL ASK ~ ....P..R C DUC T I C N ..O. I V I..S..i..C N '
COMPUTATION DATK
BAY OCTOBER 15~ 1979 dOB NUMBER BOSS-16457
A.LA SKA
I N T E R P C L A T E O 'V A L U..E,,. .... F..O.R ..... E..Y..E_.K:: ........ ~...0_0. ....... _F..E_.E.? ..... QF ...... ~ u.D.-sE A DE. F T P
........... ME,A S.UR E.D ........................... VE
DEPTH 0
TRLE SU~-SE:A TOTAL
R. T l C A L ....... V E R II.C A L ..... ~EC_I A N G U L A_B ...... CO 0 RD I.N.A !E S. ............... MD :_T. _V.D ............................... V
EPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
................... 5...7. .7.. 9 ........... 3755 · 09 .... 370
3888 3855.09 380
39~8 3955.09 390
....................... 4llO,. 4055.09 ~4..00
4226 4155.09 410
0...~0.0. ......................... 9.8...5.8..,~ ..................... 15.6.,,9,.~.,.E ........................... 2.~,.6.? ................................. 6.69
0,00 1~2,02 N 182,02 E 33,19 8,51
0.00 ~68.36 N 210.61 E 43.37 10.18
0.00 2.06..~0N .................. 2~2...~2 ..... E ~%,.88 ................................ ~.&.__5~_ ...... i
0,00 255,31 N 278,07 E 71.76 15,88
4345 4255,09 4200,00 305,7~ N 316,50 E 90,17 18,41
............................. ~.~.~ ........... 4~55,..0~ .... ~.30.0_..O..G ~56....7.1 N .................. ~.5..5~..6P .... E ...................... !...g_i,O~ i8.85
45~ ~455.0s 4400.00 A08.45 ~ 395.49 E 128.48 19.45
4702 4555,0$ 4500,00 459,70 N 435,10 E 147,62 19,15
................................. ...... 82..2 ~6.55.,09 ........... ~.6.0.0.,.q0 ........ 5_!1.,.27..N .......__~.7.~40_._ E_ .. .!6~_.13_, ....................... 19,51
4942 ~755,09 4700,00
5065 ~855,09 4800,00
5315 505~,05 5000,00
5440 5155.09 5100,00
................ 5~67 ........... 52..55.,.0.9 ........... 5.2.0.0,00
569~ 5355,09 5300,00
5822 5455,05 5~00,00
5c~0 ........ 5~,0~ ............ 5500,00
.............. ~.~ _~ ~_~ .....
564,18 N 5!7,17 E 187,74 20,60
619.58 N 562,73 E 210,80 23,06
6.7_6,..!.~.._.~ ...... ~A_~., ~.0 E ............ ~..~.q~ ...................... ~A .23_
732.54 N 65~,2~ E 259,~7 24,93
788.72 N 710.34 E 285.53 25,57
........ 84.5,.38...B .......... Z63,2..1_.~ 312,05 26,52
.... .............. o
27,96
28.30
902.38 N
960.68 N
161~.48 N
.........
PAGE" 9
ANCHORAGE,~ ALASKA '
S OH I 0.. B p A L A S K A P R C ID U C T I 0 N. DI V I S I C N D_A, !E ...... g_.F. ........ .S..U_..R..,V.. E_Y.,_..9..C..T_.Q.B,_E..R_. .....
R-6 COMPUTATION IDATE
DRUCHCE DAY OCTOBER 15, 1979 d£B NUMBER BOSS-16457
ALASKA ............ . KELLY BUSHING ELEV, = 55,0~. FT,
TRUE SUB-SEA TOTAL
........... !~.,E, A....S~..R.,E~. ........................ V,E,R,T_.I C ~ L V E .P,,T,,,!, C.A L ................. R., .E ,. C_ T__A_K G,.__U,.L..,~..R._ .... .C_ . O_ .O . _R. _O I N A T E S
DEPTF DEFTF DEFTH INCRTP/SOLTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
6207 5755.09 5700.00 1138.17 N 1035.95 E
6335 5855,09 5800.00 1196,85 N 1089,53 E
6462 ,. '~= = ~
............................................ ~ ~_~.~_ ,..~.~ ................. ~ ~.0..0., 0.0 ........................... L~_~,.d~. N ..... ~..~.~.i.~__[
658P 6055.0~ 6000.00 1514.08 N 1191.~6 E
A23.98 28,63
452.46 28.A8
480.19 27.73
507.27 27,08
533,65 26,37
671a 6155,09 6100,00 1373,33 N 1241,13 E 559.85
6.~L9,1 ...... 625..5..~_~ ............... 6.~,~.e,~.~ ..................... ~.433.25 N .12895.~,~.'~'i':~_:__. ................
6966 6355.09 6300.00 1493.51 N 1336.09 E 611.77
7C92 6455,09 6AO0,O0 15.54,47 N 1381,91 E 637.53
7218 6555,05 6500,00 1615.69 N lq26.78 E 663,08
7~41 6655.09 6600.00 1676.95 N. 1471.07 E 688,44
746~ 6755.09 6700.00 1737.91 N 1514,22 E 713.25
7592 6855,09 6800.00 1798,30 N 1556.18 E 737,38
.........................................
7715 6955,09 6900.00 1857.59 N 1596.46 E 760.42
7e~7 7055.CF 7000.00 i~15.6~ N
................. 7Z_S.-'..~_ ............. 7_i.. ~__5 .. 0 ~ ......... _.7_ i..o 0.0 0 ......... i_ ~ 7 2.6 s ~
8079 7255.09 7200.00 2029.6A N
8199 7355.09 7300.00 2086,61 N
......... .8.~i.~ .......... 7.4.5.5 _. 0 ~ .............. 7 4 0 0.0 0 ...... 2 i ~ 9.5 9 N
1634.98 E 782,29
1672.07 E 805.25
1708.64 E 82~.00
·
174~,80 E 844,64
1783.28 E 864,19
26,21
~.A,_.lg .... ? .~.~ .........................
25.80
25.76
25,55
25.36
24,81
24,13
23.04
21,87
20,97
20,75
--"1 20.63
r'rl~ 19,56
SFEFRY-SUN WELL SURVEYING
ANCHCRAGE, ALASKA
SOHIO F..'.P ALASKA PF, ODUCTION DI.VI.SION
R-6 COMPUTATION DATE
PRUDt.iCE ['.AY OCTOBER 15, 1979
COFIPANY
DATE OF SURVEY OCTOBER 11,
·
dOB NUMBER BOSS-16A57
KELLY BUSHING ELEV. =
PACE
55,09 FT,
INTERFOLATED VALLES FOR EVEK 100 FEET OF SUB-SE.A. CEFTP
TEE.IF SUE~-SEA TOTAL
HEASURED VEPI'ICAL VERTICAL RECTANGULAR COORDIN/~TES MD,~TV,D
DEPTH EiEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
8.437 7"~55.05 7500.00 2187.69 N 1824.6q E 882.62
8556 7655.05 7600.00 225A.68 k 1867.50 F 901.lfl
8675 7755.05 7700.00 2281.21 N 191.1.99 E 920.07
8793 7£55,09. 7800,00 2326,18 N 1957,79..E 9.$_8,.90
8912. 7955,09 7900,00 2369,26 N 2003.44 E 956,97
9G2~ 80~5,05 8000,00 2409,2~ N 2047,73 E 973,4A
..... 9.1.A~ ................ ~,155,05 ....... 8100,00 2447,.,5 N 2092,68 E
9261 ~255,0~ 8200,00 2q85,05 k 21~0.50 E 1006,5~
.9578 8555,09 8~00,00 2519,61 N 2189,26 E 1023,09
9,9~ 8~55,09 . 8~00,00 2551,~2 N 2257,5~ E ...... 10.~8,61
9608 8555,09 8500,00 2580.0q N 2285.28 E 1055,07
9722 8655,09 8606.00 2605,92 k 2~,80 E 1067,20
.$~.;.5 87.55,0~ 8700,00 26.26.72 k 2582,8~ E 1080,51
9946 8~55,05 8800.00 2659,66 N 2~2~.51 E 1091,6~
10056 8955,09 8900,00 2650,9R N 2q7~.02 E 1101,69
10166 9055,07 9000,00 2661,06 N 2517,46 E 1111,18
10275 9155,0~ 9100,00 2669,86 k' 2559,67 F 1120,09
10~ 9255,05 9200,00 2677,20 N 2600.26 El 1128,2~
10~51 5~55.07 9}00,00 2684.72 ~ 265~.88 E 11~6,09
. _
V E P. T I C ~ L ....................
CORRECTION
18.43
18.51
18.8~
18.07
16,~?
16,10
17.05
16.51
15.52
14,A6
1~,15
13,32
11.13
10,05
~,90
8.18
7.83
- ~,,~,
SCHI£ PF ALASKA
P-6
PRUDHCE
ALASKA
PFCCUCTION
,
SPERRY,SUN 'WELL sURVEYiNG
ANCHORAGE~ ALASKA
UIVISICK
COKpUT'ATION DATE
OCTCDER 15, 1979
COMPANY
CATE CF
PAGE .1 1
SURVEY OCTOBER 11, 1979
.,~,~
dC~ NUMBER BCSS-16657
KELLY BUSHING ELEV, : 55,09 FT.
IN TE RPOLA TED
TRUE SUE-SEA
ME~SUFE~ VERTICAL VERI'ICAL
DEPTH DFFTF DEFTF
VALUES FOR EVEN 100
TOTAL
RECTANGULAR COO
NCRTF/SOUTH E
lOt, 9c~.., , r'~A~5.0q., ~ . q400.O0. 2694.08 N
10688 9536.57 9~81.~,8 2702,69 N
USE
(FRCN
TFE CALCULATION
TFE NEAREST
PROCEDURES
20 FOOT NED
LINEAR INTERPOL
R/~DIUS CF CURVAT
FEET OF SUB-SEA DEPTH
RDINATES MC-TVD
AST/NEST DIFFERENCE
2680,59 E 1144,40
2713.F~9 E 1151.45
AT I ON Ei.E ,T...N,EEN .....................
URE) POINTS
VER T!._C...Ak ...............................
CORRECTION
8.:31
7.04
....... P'-
/
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
Alaska Oil & Gas
3001 Porcupine Dr.
Anchorage, AK 99402
Attn: Mr. H. Hamilton
3111 "C" STRE
ANCHORAGE, AL~$K~ ~
TELEPHONE (907)
MAIL: POUCH
ANCHORAGE. A LASK-A
REFERENCE: Well Data Transmission
(~'~'he following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
R-6 Boss Gyroscopic Directional Survey 916457
10/11/79 2 copies
1 sepia and 1 prin% for the following well:
R-6
i 5-
FDC Run 1 5"
BHCS Run 1 2" & 5"
DIL Run 1 2" & 5"
CPL Run 1 5"
Colette Tracy
Well Records
19
SOHIO PETROLEUM COMPANY
DJvJsion of Sohi~ Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
October 16, 1979
j c:..'-'xvu~,~"l~ I
-~J ~1 G~O[..._ ~ MAIL: POUCH 6-612
Alaska Oil & Gas Conservation Conmission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Well R-6
(32-32-12-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report
of Dri¥1ing and Workover Operaffions, for the above-
named well for the m~nth of October, 1979.
Yours very truly,
P. R. Judd
Dis~'ict Drilling Engineer
PRJ: ja
Enclosures
cc: Well File ~17
Form No. 10-404 .
REV. ~-1-70
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
1.
WELL WELL OTHER
2. NAME OF OPERATOR ~ohio Petroleum Ccx~pany, a DiVzslon of Sohio
Natural Resources Company'
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, AK 99502
4. LOCATION OF WELL
At Surface: 729' NSL, 3880' WEL, Sec. 32, T12N, R13E, UPM
.
$. APl NUMERICAL CODE
50-029-20388
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28279
7. IF 1NDIAN'ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
R-6 (32-32-12-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec. 32, T12N, R13E, UPM
12. PERMIT NO.
79-52
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
October, 1979
Cleaned out casing to 10630'. Tested casing to 3000 psi. Displaced well to NaC1, Ran
CBL log. Ran 229 jts. 7" 26# L-80 AB-IJ-4S tubing to 9294'. Landed tubing with ball
valve nipple at 2018'. Installed and tested tree. Displaced tubing to diesel. Set packer
at 9191', tested tubing to 3500 psi. Released rig at 1800 hours, October 4, 1979.
14. I hereby certify~eg~oing is tr~ue and ~,~ect
SIGNED
TITLE District Drillinq En.c~f. DATE / O/~ ~//7~
NOTE-Report on this' form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
October 3, 1979
3111 "C" STREE~T
ANCHORAGE, A L/~-I~/~ '
TELEPHONE (907)
MAIL: POUCH
ANCHORAGE, ALASFA
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentl~:
Well R-6 (42-32-12-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report
of Drilling and Workover Operations, for the above-
named well for the month of September, 1979.
PRJ:ja
Enclosures
cc: Well File #17
Yours very truly,
SOHIO PETROLEUM COMPANY
District Drilling Engineer
Form l~b. !>3-404
R?-V. 3:L70
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
50-029-.20388
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28279
WELL WELL OTHER
2. NAME OF OPERATOR Sohio Petroleum Cc~3any, a Div. of Sohio 8. UNIT FARM OR LEASE NAME
Natural Resources CQmpany Prudhoe Bay Unit
3. ADDRESS OF OPERATOR 9. WELL NO.
Pouch 6-612, Anchorage, AK 99502 R-6 (_42~32.~12-13)
4. LOCATION OF WELL
At Surface: 729' NSL, 3880' WEL, Sec. 32, T12N, R1. 3Er. UPM
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC. T. R. M. (BOTTOM HOLE OBSECTIYE)
Sec, 32
12. PERMIT NO.
79-52
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
September, 1979
Spud well 1300 hours, September 11, 1979. Drilled 17~1/2" hole to 2700"-, Ran 67 jts.
13-3/8" 72% L-80 Buttress casing to 2661~'. Cemented with 3853 cu..ft. Permafrost II
cement. Installed and tested BOPE. RIH to 2618'-, tested casing. Drilled to 2727'
ran leak-off test. Directionally. dri'lled 12-1/4" hole to 9750''. Ran 250 jts, 9-5/8"
47% L-80 Buttress casing to 9740'. Cemented in two stages: First stage with 1384
cu. ft. Class G cement; second stage through D.V. Packer at 2583' with 130 cu,ft.
Permafrost cement, preceded by Arctic Pack. Cleaned out to 9682", tested casing.
Drilled out to 9776', ran leak-off test. Directionally drilled 8-1/2" hole to
10688'. Ran open hole logs and sidewall cores. Ran 36 jts. 7" 29% L-.80 Buttress
casing to 10681'. Cemented with 336 cu. ft. Class' G cement. Cleaning out casing.
14. lhereby certify th~~tru~d co_.~, District Drillinq Enqinee~ATE
MOTE-Report on this' form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and Oas conservation committee by the 15th of the succeeding month,unless otherwise directed.
Alaska Oil and Gas Conservation Ccmmission
Hoyle H. Hamilton /~~ September 17, 1979
Chairman of the Ccmm~on
Commissioner
E<bby D. Foster
Petroleum Inspector
Witness BOPE Test on SOHIO's
R-6 Sec.32, TllN, R13E, UM
Pezmit #79-52
Thursday, Se~t~ 1,3,. 1979
I departed Anchorage via ~0HIO's flight #1 at 9:45 AM to Prudhoe Bay and
arrived at the location at 11:30 AM.
Friday, Se~.tember..14,. !979
The BOPE test began at 11:30 AM and was ccmple~ at 7:15 PM. During the test
a small pin hole developed in the shock hose between the BOPE stack and the
choke manifold. This hose was changed and tested. The results of this test
are attached to this report.
In summary I witnessed the BOPE test on SOHIO's R-6.
'..*"~~ ~.i~~ _-~; -~. ::. :.,~,~ . .~.~;. .c;:_~ '- :2-~-~;-*-'-~'2-~'. ~: : X':~" ' -' -
.-:****~-~: ; AlaSka Oil and Gas Conservation. Commission
-~}}~:.-' .:'.:~:--.} ~'Field InspeCtion. of Blowout Prevention Equipment
.**'-;'.+'." . .- _., .
Dril ling Con. tractor~~/~ ~/ze7..~
Location, General
"'?"*"'"' -'-
-"~'-:"-'"'~ ':': lOX
,~.-_*.-f-;~'t-., Reserve pit
-BO PF. S.{: ack
Annular Prevente
Pipe Rams
BIind Rains
Choke Line Valves
H.C.R. Valve
Kill Line Valves
, ...
Da'te ¢'-' /¢-' 7¢ ; ":'
#, ?'¢-
/'?~Casing Set @ ft.
Check Valve.
, . Rig #_/ Rep'resentative~)~? ~O; ~
ACCUMULATO'R SYSTEf. I ~
.
FUll Charge Pressure~0~0 psig
Pressure .After Closure /~~ psig
Full Charge Pressure Attain in:~ min*/~.qec.
N2 ~~w~. , ~/~; ~DoO,. ~~0 .osig
RemOte Controls
O~ ,sig
Kelly and Floor ,Sa.fe~;y Valve'~
Upper Ke].ly / Test Pressure
'Lower Kell.y / Test Pressure
Ball Type / Test Pressure -'
Inside BOP, / Test Pressure "-
Choke Hanifold / Test Pressure~O
No. Valves //
No. flanges
Adjustable Chokes
ltydrauically operated choke
Test ResUlts: Failures / Test Time ~ hrs. -
Repair or Replacement of failed equipment to be made within days and
Inspector/Commission office notified.
Dist vibut ion
oeig: - A0&GCC
cc' - ' Operi, tor
cc - Supervisor
August 9, 1979
Re: Prudhoe Bay Un it R-6
Sohio Petroleum Company
Permit No. 79-52
Sur. Loc.: 3880'~L, 729'NSL, Sec 32, T12N, R13E, UPM.
Bottomhole Loc.: l180'W~L, 3400'NSL, Sec 32, T12N, R13E, UPM.
Mr. P. R. Jud~
District Drilling Engineer
'Sohio Petroleum Company
Pouch 6~612
Anchorage, Alaska 99502
Dear Mr. Judd:
EnclOsed is the approved application for permit to drill the
above referenc~ well.
Well s~ples, core chefs and a mud log are not required. A direc-
tional survey is required. If available, a tape containing the
digitized log info~ation on all logs shall be submitted for
Copying except experimental logs, velocity surveys and dipmeter
surveys.
~any rivers in Alaska and their drainage system, s have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to AS
16.50.870 and the regulations promulgated thereunder (Title 5,
alaska Administrative Co~e). Prior to commencing operations
you may be contacted by the Habitat Coordinator's office,
Department of Fish an~ Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Pederal Water Pollution Control Act, as amended. Prior to
commencing operations you may be contacted by a representative
of the Department of Environmental Conservation.
Mr. P. R. Judd
Prudhoe Bay Unit R-6
--2-- '
August 9, 1979
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska
Department of Labor is being notified of the issuance of this
permit to drill.
To aid us in scheduling field work, we would appreciate your
notifying this office within 48 hours after the well is
spudded. We would also like to be notified so that a repre-
sentative of the commission may be present to witness testing
of blowout preventer equipment before surface casing shoe is
drilled.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
withes$ present.
Very truly yours,
Hoyle H. Hamilton
Chairman of BY OR~'~ 07 THE
Alaska Oil & Gas Conservation Commission
Enclosure
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o/encl.
Department of Labor; Supervisor, Labor Law Compliance
Division w/o encl.
h~: be
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
August 6, 1979
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
CONFIDENTIAL
Alaska Oil and Gas Conservation ~ssion
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Hoyle H. Hamilton
Director
Well R-6 (42-32-12-13)
Enclosed are the following documents:
1. Application for Permit to Drill, in triplicate
2. Proposed Drilling Program Outline
e
Our check for $100.00 to cover the permit
filing fee.
.
Three copies of surveyor's plat showing well
location.
Very truly yours,
SOHIO PETROLEUM
P. R. Judd
District Drill'.~ng Engineer
PRJ: ja
Enclosures
cc: Well File #17
Form 10-401 ~ ~ SUBMIT IN TR~ .ATE
REV. 1-1-71 (Other instructions on
reverse side)
la. TYPE OF WORK
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
PERMIT TO DRILL OR DEEPEN
DRILL r-~ DEEPEN [~
b. TYPE OF WELL
OIL GAS
WELL ~-] SINGLE MULTIPLE
WELL [~] OTHER ZONE ~-~ ZONE [--]
2. NAME OF OPERATOR
Sohio Petroleum Company, Div. of Sohio Natural Resources Co.
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL
At surface
.
3880' W]~_,, 729' N.~L, Sec. 32, T12N, R13E, UPM
At proposed prod. zone
1180' ~t~, 3400' N%, Sea. 32, T12N, R13E, UPM
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
10 miles NW of Deadhorse
APl #50-029-20388
6. LEASE DESIGNATION AND SERIAL NO.
ADI, 28279
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
R-6 (42-32-12-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay,Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM
HOLE OBJECTIVE)
Sec. 32, T12N, R13E, UPM
12.
14. BOND INFORMATION:
TYPE Blanket Suxetyand/orNo. American Insurance Co. 3348616
Amount
$100,000.00
15. DISTANCE FROM PROPOSED * ' - 116. No. OF ACRES IN LEASE
LOCATION TO NEAREST ..L_L~U west_ or. 2459
PROPERTY OR LEASE LINE, FT. ~,I~T. QQ2vQ
(Also to nearest drig, unit, if any) z~.,.a.~ ,-v t ~, I
18. DISTANCE FROM PROPOSED LOCATION 119.PROPOSED DEPTH
TO NEAREST WELL DRILLING, COMPLETED,
OR APPLIED FOR, FT.
3235 ' north ~of Well R-5. I 10759'MD 9457 ' TVD
21. ELEVATIONS (Show whether DF, RT, CR, etc.)
KBE = 55' AMSL est.
17. NO,ACRES ASSIGNED
TO THIS WELL
160
20. ROTARY OR CABLE TOOLS
22. APPROX. DATE WORK WILL START
September 20, 1979
23. PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE MDSETTING DEPT~ Quantity Of cement
36" 30"x20" Insulated Conductor 110' 110' 605 au.ft. Arcticset
17~" 13 3/8" 72# L-80 2590' 2590' 5115 au.ft. Permafrost II
12~" q ~/R" 47:E L-go ' 9775' 8656' 1400 au. ft. CI~.~s G: 130 au.ft. '
~ ,
8%" 7" 29# L-80 10759' 9457' 407 au.ft. Class G
~FC
See attached proposed drilling program.
IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on present productive zone and proposed
new productive zone. If prOposal is to drill or deepen dkectionally, give pertinent data on subs'ufface locations and measured and true
vertical depths, Give blowout preventer program.
24. I hereby cerf~fy that~oregoing is True and Correct
SIGNED ~:) ~ ~ ~~ll~..,~ ~~~-
DATE.
TITLE District Drlq. Engineer
(This space for State office use)
SAMPLES AND CORE CHIPS REQUIRED
~,.NO
DIRECTIONAL SURVEY REQUIRED
'RI'YES [] NO
CONDITIONS OF APPROVAL, IF ANY:
MUD LOG ~N
[] YES O
OTHER REQUIREMENTS:
PERMIT NO. 7 ~ ' ~ ~ APPROVAL DATE
/"%'/, *;~~,,..~ Chairman
~' [/ *See Instruction On Reverse Side
BY ORD,""R OF THE CO~,~M!SSION
A.P.I, NUMERICAL CODE
go-- o2-9-7., o3 go°
August 9, i979
8/9/ 79
DATE
PROPOSED DRII.I.ING AND COMPLETION PROGRAM
Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated
conductor to surface using Arcticset cement.
Drill 17 1/2" hole to 2600' and cement 13 3/8" 72# L-80 Buttress cas'lng to
surface using 5115 cu. ft. Arcticset cement.
Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams,
and annular preventer frc~ 13 3/8" casing point to T.D.
Directionally drill 12 1/4" hole to 8656'+ TVD. Run 9 5/8" 47# L-80 Buttress
casing %o 8656' TVD and cement first stage with 1400 cu. ft. cement. Cement
second s~age through D.V. packer collar at 2600'+_ with 130 cu.ft.' Pezmafrost C
cement. 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus'
will be Arctic Packed.
Directionally-drill 8 1/2" hole to T.D. at 9457'~ TVD. Cement 7" liner to
500' inside 9 5/8" casing shoe with 407 cu.ft. Class G cement with. 18% salt.
Run 7" 26# L-80 Atlas Bradford IJ-4S ~bing with. a production packer assembly
at 8208'_+ TVD. A subsurface safety valve with dual control' lines' will be ·
placed at 2000'+. Displace tubing to diesel'.
install ~r~ test Xmas tree.
Su~nd well for perforat'~mng subsequent to' rig release. .Details of proposed
perforations to be submitted on Sundry-Notice to follow.
- = 40 ' lO 20-- ', ' 50 40 lO_ = 20.
-- - -:: t ' t. ..
04 i_' ' : ' - ~" ~ '' '
4862' ' '
50 40
' -" !~ ' :' -'' :' J T R:~(Proposed)
_ ~ .: .-: .-_ !-. ..... co _ . ' ';- . i- J
-~?~::-.--~,_ ,-:-:: ~..: F-:-=-::~, .. ...~ ~ '~:--:
/
- ' ::-:.'-- . ~- ''-':-- { '-,.-- J.- --.'-'---'~- ~' R-Ia:
I_.-j.~. ~-':~..-..., :.._. ~ . /L~ _
I' '-"-': j' - = 7~0'44.95"
-': ~'-:':':::~,.~'-':"': ~ ,o'~'~J ~: ~'~"4~
' ': ?.:"-.': --: -; - - (P<~'- IT :- -:-:J: :,' -: - - --' '
' -.:::-'::.-: .--'-'- 'I -':.'--'' '- "~i, ' %-:-' '~1 ~ -'
"'I' :"::'"- ""
.--':: -'~:_'~' ~' -- -" - .'" -- ?,:' ; -'' -' ' '-
~:"02 ...... ;"-'-- ' '" ; .... '"-' : '-J- ' "''940' -~R-4 ' '. ' - I~
..:: -:~-::'>:-:..::', ;--'_ . ~ :_ - ~' _ . . ~(~rop~,~).
':::7 :: -" '~fi?':'-:/.':'"' .... ::'-"..'.::I'~:'.:-::. ~-.: :.'.-:'-??'-." ': :~: "--.
::- ...... ? ':.~-:~-.,~ ~-" ' - ~:;" --.': :-'- - : .... : . '--~ '
. ~-_': :-.:. ':-.- ~: ]: '. .. : - ,: _~ -- : : . ,. _
.'--::7:. - ' -; { - - : -- '- '-J "-; - ~
:.::'.' '~. ~ ~ ~ . _ -~-.':- .:. '~- I' " -t
. -.-
.
.
:-
_:.:._ . : -.".._PORTION OF T 12_ N, R 13E, UM
--' .. SCALE - I"=-I/~ MILE --'
. -': .. . -...-_ -...
-_ .
_
~ . .
'--::."CERTIFICATE OF SURVEYOR' -'
.2 ' . '. :. '- : ' _ . _ ..... . --? ,
.
. _
- ! hereby certify thai lam properly registered to'.:
.
-- practice-lend:surveying in, the State of Alaska-and'that this plot
....
--" represents';oiocoiion:su}~eyof the well shown and the wells
-thereon. _This ~survey-.wos~mo:Ce by me or under my su rwsion
and alt. dimensions and Other details ore correct. Bottom hole
loc )ns ore furnished-by others;
-~.~ - - ~.,
- Su r ye y or
.
NOTE Al bottom holes are 8800' sub sea.
- 135' j. 353'
PAD DETAIL.'--,
SCALE 1" = 400'
Located in
SW I/4 PROTRACTED SEC. 5Z,T. 12
Surveyed for
B.R ALASKA INC.
Surveyed by
F.M. LINDSEY & ASSOC.:
LAND & HYDROGRAPHIC SURVEYORS
2502 West Northern Lights Boulevard Box 4-~81
Anchorage Alaska
.'(-
03
04- ' :' :-
"
.
·
_.i
·
c~- ~ ~ '-
.. i ~ORT~ON OF T I~ N, R I~ E, UM
sCALE I"
' .= ![~ MILE
. .
.... CERTIFICATE OF SURVEYOR
·
I hereby certify that I-am properly registered to -
land. surveying in the State of Alaska and that this plat
representsa Ioca~ion.survey of the wellpad shown (]nd the wells
'thereon. _This ~survey waS;matte by me or under my supervision
and_oiL dimensions-and other detai-ls are correct. Bottom hole
locations are furnished by others. -
Date . . Surveyor t:'i~',.i:.:: .::-~
..
NOTE: Al bottom holes are 8800' subseo.
135'
PAD DETAIL
SCALE I" = 400'
.
. _.._=.,~,~,~.~=._ .- ..
..~. ~ ~ ~e ~ '~ ~- .' '
- .
.
Located in
sw i/4 P.ROTI~SCTED SEC- 3Z,T. IZ N_,R. 13£.,UIdIAT MERI.DIA .Nt AK;
Surveyed for
B.P, ALASKA INC.
· i - : .... ..~- ' _:- ,. ---:~-_ - _ ---:.~'~"'~ .... ~-
Surveyed by
E M. LIN DSEY 8~ ASSOC.
LAND ~ HYDROGRAPHIC SURVEYORS
2502 West Northern Lights Boulevard Box 4=081
Anchorooe Alaska
PROPOSED DRILLING AND COMPLE~ION PROGRAM
Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated
conductor to surface using Arcticset cement.
Drill 17 1/2" hole to 2600' and cement 13 3/8" 72# L-80 Buttress casing to
surface using 5115 cu. ft. Arcticset c~t.
Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams,
and annular preventer frc~ 13 3/8" casing point to T.D.
D~rectionally drill 12 1/4" hole to 8656'+_ TV/).· Run 9 5/8" 47# L-80 Buttress
casing to 8656' TVD and cement first stage with 1400 cu. ft. cement. Cement
second stage through D.V. packer collar at 2600 '+_ with 130. cu. ft.' Pezmafrost C
cement. 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus
will be Arctic Packed.
Directionally drill 8 1/2" hole to T.D. at 9457'+- TVD. Cement 7" liner to
500' inside 9 5/8" casing shoe with 407 cu. ft. Class G cement with 18% salt.
Run 7" 26# L-80 Atlas Bradford IJ-4S tubing with. a production packer assembly
at 8208'+_ TVD. A subsurface safety valve with dual control' lines' will be
placed at 2000'_+. Displace tubing to dieseZ.
Install ~nd test X~nas tree.
Su~i~nd well for perforating subsequent to zig releaSe. Details of proposed
perforations to be sutmlitted on Sundry Notice to follow.
3.
e
e
e
e
9~
.0.
· Is ~a
a .............. e.........---..
atmeh~ ' : ......
. · . . . ,.. --
,..~
. : .','~.,
.. .......
,
Is ~11, ~' s. , ............
,
· . . .
',..
Is' ~f~c~ acrea~o ~afl e ~ ~s ~1 ...........
dev~t~ ' '
¢ . . . .
Is ~1 ~ ~ · .'
--
.
, ,
~ra~r ~ a ~ ~ force '
.
Is a court,on o~ ne~ '
, ,
administrative approval needed '
.2, Is ...................................
3 Is conductor-string proVided
.4. Is enough cenent used to circulate on conductor ar~ surface ..... ' ...~4~
.5. Will cement tie in surface and intermediate or production strings . .'.~a~
.6. Will c~ment cover all known productive horizons ..................... 6~ __
.7..Will surface casing protect fresh w~ter zones ....................... ~
28. Will all casing give adequate safety in collapse, tension and burst.
_9. Does BOPE have sufficient pressure rating - Test to
psig . .~
Approval Reccmmended:
~ditional Requir~nents:
'Itch :. 'Approve,
(1) .Fee
(2) Loc. CA~~
, .
(3) Admin. J~'/-
(4) Cas9. ~~
(5) BOPE ~
Geology:
Engineering:.
O ¢
· ~
Well Histo.w File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information-of this
nature is accumulated at the end of the file under APPENDIX.'
No special'effort has been made to chronologically
organize this category of information.
' '1,1,. ': , .....
11,
1111,
11,.11,
1,1
11
11
11.
1,1.
:11
11
1,,1,
111,111
111111
5555555555
5555555555
55
55
555555
555555
55
55
55
55
55 55
55 55
555555
555555
' 000000' .
000000
00 00
00 00
00 0000
O0 0000
00 00 00
00 00 00
0000 00
0000 00
O0 O0
O0 O0
0 0 0 0 0 0
000000
777777717'1
77777'77777
1'7
'17
17
77
?7
7'7
77
7'1
77
"77
7'7
7'7
7.7 :t ~/'.7 !t 7 '1 '77
7:7717 7'777'1
7'1
77
'17
7'1
! 7
77
7 7
7'1
7 7
'77
'7 '?
77
000000
000000
00 00
00 00
O0 0000
00 0000
0 O 0 0 0 0
00 00 00
0000 00
0000 0 f)
00 00
00 00
0000 0 ()
000000
O0
O0 00
O0 0000
O0 0000
00 00 00
O0 O0 O0
0000 00
0000 00
O0 O0
00 00
O 0 0 0 0 0
000000
O~O000:. ~' ...'777'77'17]1"~'7
0000 ()0 17 ? "7 '77 '? 177
0,0 '77
? 7
'1 '7
77
'77
7 '7
17
7 '7
'? 7
7 '?
7 '1
17
77 '? 777'77'77
'11 ? ?'777'17'1
7 ?
77
77
7'1
77
7 l
7 '7
'77
'1 ?
11
17
000000
000000
00 00
00 00
00 0000
00 0000
00 00 00
O0 O0 00
0000 00
000 O0
0 00
O0 00
000000
000000
M
MM
M
J
d
dod
J A A A
d A A
d A A
d A A
d AAAAA
d A A
~ A
PPPP
p p f4 R
P P P. R
PPPP
R
P 14 R
U U DDL)D
U U O D
U b D D
U U D O
U tJ D D
U U g D
U U U U U I) l,) i) P
H H UUU
H n U U
HHHHH U U
H H U 0
H H U O E
H H UUU
b'l (.J 1~11 'I' riB:
LJb~ER PCAL [10707,570'10IT dob
,SwS Kl~l. Ob34 dUb-l'¢. ,,3'1'A14 ,
hi ~5 l~ R FCAL
5v'~b kblO~.34
tlO70/,57070J dU~
d Lib-"/V. * 6'I'ART*
SHIP
SkU. u452
6452
DA'fL 25-JAN-80
D A'I' f_. 25-JAl~-80
12:52:49
12:52:49
1I.I111
II,.lllI,
ii
Il.
I1.
ii
1,1
ii
ii
II
Iilil, l
I, llIli
Y.~
YY
000000 000000 11
000000 000000 I 1
00 O0 00 O0 I 11,, 1
00 O0 00 00 1111
00 0000 O0 0000 I. 1
00 0000 00 0000 11
00 00 00 00 00 0 () 11.
00 00 O0 00 O0 0() I 1
0000 O0 0000 00 11
000'0 O0 0000 00 I 1
00 O0 (}0 O0 11
O0 O0 O0 O0 11
000000 OOO000 :1. 1111:1.
000000 000000 111. 111
*START* USI:;R PCAL LlO707,57070J d(Jb SHIP
FiL, EI DS~,HlVERI~'t.001<05~>[10/07~5"1070I CREATE:D:
PHINTEI): 25-dAN-80 12:53:0~
OOEUE St~I. TCHE~: /PILE:~UR'I' /CUPIES:I
/~FACi~G:I /LiMIT:S9 /~'URMS:NURSAL
6452 DAT~
25-dAN-80
,25-dAN-80
12:51:25
12:52:49
S C ~ b U ¢1B IL; t4 g g P, C t'J Iq. P LIT I. N G C ~-; N 'IL' El k
i 070 I, 57070
F: E; E h H 1:.: A D.E R
DAT~: 80/ 1/25
T A t-:' g H E A D g R
I,E;NG'TH: 1,32 B~TES
TAP'E NAIV!E: 570'70 DATE: 801 1t25
SE:.RVI. Ct~ .N,AIqE: EDIT
TAPE C£]NTI,NUA"I.'~ION ,Ntl~¥1BER: 01,
.PRE:VIUU& TAPE Ng. lvjg:
C[:]g[~)E.,~,~'rS: U.NI..OUE ~EI.,I.., 1DE.NTIE'ICATION NBNBBR 18 50-02~-20388
'r h P ~; C [].rq N g i:x~ T S
CSG 9,625" $ 9"12'7~ wEIGBT 40.00 BB/F / ~BUID XC PUB~t,R / DENS 10.1
i0.10 / rISC 42.00 SEC / P~ 10.50 / R~ 2.13
~ 7B I,)E' / RgC 3,20 (~ 78 DF / BHT 189 D~'
NANE: EDI'I' .001
~4AXlt~ulv'~ P,H~$1CAL, RLCo~D L~;NGTH: 1024
buGS .
WEJ[,I~ al I'B INP[.jlqgA'I'itjtu F, ECORD
CLI~v~PAN ~:
v~'gLh:
1- lk, bb:
RANG}',:
SE.:C I'1 [iN:
177 tS ~'I'E$
SUH10 PP.'I'ROb~UN CUNPAN~
~RUDHt)E BA~
]2N
32
N .
..,
I" TM
0
SIZE
1
66
D A T U .~'i ~S P ECI i~ 1 C A T 1 (] F~ B b (JC K ~ ~
1 C T (J (J £,
SV'URDt~ UN.ITS at~>1 AP.I .~PI. APl FILE;~ 51.2,~.; L. XI:' PRtiC SA..[vl REP D.tgPT SHIt'~I'
O H M ~
GAP 1.
GAPI
I ~
G .t C: 3
P U
G/C 3
C/C
CPS
0 0 0 0 0 4 0 0 1 6 8 0 0
'? 1 0 0 0 .q 0 0 1 6 8 0 0
7 1 2 4 b 0 0 4 0 0 ' 1 b 8 0 0
7 1 2 4 4 0 0 4 0 0 1 O 8 0 0
3 :2 2 8 0 0 .4 0 0 1, 6 8 0 0
'7 31 3 2 0 0 4 0 0 1, 0 8 0 0
7 5 2 3 2 O 0 4 0 0 1 6 8 0 0
4 2 3 1 3 2 0 0 4 0 0 1 6 8 0 0
,4 2 2 8 1 0 0 4 0 0 I 6 8 0 0
~ 2 4.4 0 0 0 4 0 0 1 b 8 (.) 0
4 2 O 8 2 0 0 4 0 0 1 6 8 0 0
4 2 3 5 .1 0 0 4 0 0 1 6 8 0 0
4 2 ,4 2 1. 0 0 4 0 0 1 b 8 0 0
42 34 92 0 0 4 0 0 1 OB 0 0
42 34 93 0 0 4. 0 0 I ~ 8 0 0
)
D E; P T H
10690. 000
10600 . 000
10500 . 000
10400.0O0
10300 . 000
10200 . 000
10100.000
IO000.000
9900. 000
9800. 000
9700.000
.E M (.1N i C
GR
GR
D }; fi (J
NCf4L
GR
GR
DEB[)
NC N ,iL.,
GP
NCNL
SP
D R fi
N C N b
8P
SP
GR
DRHL)
NCNI-,
,BP
GR
DHHO
NCNI,
G~
NCi\~L
GE
loRHU
r~C NI,,
'V ,A b U E
- 1, 5. 000
171. 000
0.1,32
2258.000
-10.250
:17,4.500
0.05'7
2780.000
- 8 '7.000
1'72. 750
0. 059
3:14,4.00 (,)
-'75.875
1. 1 :I. 250
0. 077
,3,308.000
-68.250
108.813
0.0'71
375:2 · 00 ()
- 72.06.3
11,0.875
0.024
4,48,4 . 000
-7 3.000
1. 20. 000
0.0:23
3076.000
-55.500
128.750
-0.005
3144.000
-56. O00
1 35. 000
0.031
32t>8.()00
-14.1.5b
17t.315
0.091
1826.000
53.750
149.500
-999.250
-999.250
i~l ,N
EMO,N1C
I L D
DT
N P t't I
1 L D
N PH 1.,
f C N.h
1 L D
DT
N P }'t I.
i,'C NL
I, LD
D T
NPH1
~CNL
I. LD
DT
1 L IL)
D T
f'CNL
1.1~ D
lot
NPHI
~' C N L
].LD
DT
NPHI
f C n b
l. bD
UT
ILD
DT
f'CNb
1
DT
NPhi
fCNL
V A L IL} g
4.180
74.750
18.945
938.000
12.102
'71.000
12.891
1269.000
4.133
74.1,88
12.1,58
1525.000
1.886
88.56.3
18.848
1331.000
2.9,38
78.1.88
15.5:2 '7
1 6.34. 000
16.922
69.750
8..~96
2666.000
13.445
95.1.88
21.~31
1262.0OO
0.Stol
8.3. 188
1 '?. 383
1.310.000
16.922
84.375
18.799
1285.000
1.557
1 Or>. 188
2O. 068
6%2.500
7.887
68.000
-99925.000
-999.250
MN~iMON lC
i b M
GR
1 ,BM
F, fl O ,0
1 LM
1, L M
G,R
I6~
GR
RflOB
i LM
Rkit.)g
i bM
GR
.t L M
GH
1 LM
RI-il.ID
IBM
V A L O E
3.850
1,29.875
1.915
10.195
1,08.438
2.O91
4.566
113.938
2.~15
2.02.3
45.281,
2. 375
3.102
43.375
2.361,
17.781
4'7.125
2.432
10.453
55.031
2. 209
0. 695
40. 906
2.~34
12.b16
74.563
2.387
1.451
114.438
2.391
2000.000
-999.250
-999.250
M l~ ~ M O N 1 C
hb8U
CALl
NRAT
668U
CA61
NRAT
,,bb8O
Ct;hi
NRA"I'
bhSU
CALl
NRAT
bb8U
CALl,
NRAT
bL8U
CALl
NRAT
bLSO
CALl
NRA1'
bb8U
CALl
NRAT
bb8U
CALl
NRAT
bbSO
CAUl
NRA'£
bb80
CALl.
NRA'i'
VALUE
4.758
7.574
2. 209
17.094
9.195
1.930
12.11,?
8.820
I .851
4.719
U..36 't
2.264
"l.OSO
8.0.39
2.012
52.'181
8.391
1.569
14.531
8.203
2.438
5.949
U.391
2.1~4
18.2,19
2.287
2.105
15.594
2.6Lq
1.qb7
-999.250
-999.250
0 E; F
9650 o 000
r~i {:~, k M 0 N I C
(;I4
D ,F~ ~ (,,~
N C: N JL.~
¥ A L U
t~4 txl t~ M O N 1 C V A i,~ U E;
8 .,,~. 250 1, b,D 7.848
I 54. :125 DT 55. 375
-999.25(,) NPHI -,99925.000
,,-999,250 [":C N iJ -999.2,50
1
GR
V A L, U E
2000. 000
-999. 250
-999. 1250
C A1"i
NRAT
VAL, Ut~
1..591,
-999. 250
-999.250
1.024 B~TES
TAPE T'~AibE~
.1:.., [5 t.xl G T ,~'t: 132 B 'i T k;,..5
'1" A.P E t~ A 1:'4 E: 5 ? '070 [) A T E; 80 / I / 25
SEIxV ICE ,¢~AM~: EDIT
'rAPE C[llIiTINUATIUI',i i',IUMBE~: 0f
J'~EX,'.[' 'i'A[-:'E; IXtAIVlE:
Cl:.Jg~v~l~.:i'q'I',5: ll.tul£./LIl{, ~tk;bh i£)E.I",ITii:ICA'I'ION hlUI'4~ER IS 50-(.)29-20.Jt::t8
11 000000 7777777777 000000
11 000000 777777'7777 000000
1111 00 O0 77 O0 O0
1111 O0 O0 77 00 O0
11 O0 0000 77 00 0000
11 O0 0000 77 O0 0000
11 O0 O0 O0 77 O0 O0 O0
11 O0 O0 O0 77 O0 O0 O0
11 0000 O0 77 0000 O0
11 0000 O0 77 0000 O0
11 O0 O0 77 O0 00
11 O0 O0 77 O0 O0
111111 000000 77 000000
11~Ill 000000 77 000000
7777777777'
7777777777
77
77
77
77
77
77
77
7'7
77
77
'77
~66666 000000 333333 5555555555
66~666 000000 ~33]~.~ 5555555555
66 O0 O0 ]3 ~3 55
66 00 O0 33 133 55
66 00 0000 ,~3 555555
66 O0 0000 ~,~ 555555
66666666 00 O0 00 33 55
66666666 00 O0 O0 ,~3 55
66 66 0000 O0 ]] 55
66 66 0000 O0 '~3 55
66 66 00 00 313 ]3 55 55
66 66 00 O0 33 .~.3 55 55
666666 000000 3333~3 555555
666666 000000 3,331333 555555
222222
222222
22 22
22 22
22
22
22
22
22
22
22
22
2222222222
22122222222
*START* USER PCAL [I0707,603521 dOB SH1P 8Et~. 1507 DATE 14-APR-80 11:03:49
M O N I T O R S W S K L 1. 0 E 34 d' U b-'79 . * 8 T A R T *
*START* [;tSER PCAL [10707,60352] d[JB SHIP SEO. 1507 DATE 14-APR-80 11:0,3:49
ONI. TOR Stt~'S l(LIOE34 dUI..,'79. *STA. RT.*
/
//
?/
/ SSSS$SSS
SSSSSSSS
SS
SS
SS
SSSSSS
SSSSSS
$8
85
SSSSSSSS
SSSSSSSS
I I
II
II
II
II
Ii
II
II
I, I
II
II
Ii
I I
II
I I
I I
11
i i
PPPPPPPP
PPPPPPPP
PP PP
PP PP
PP PP
PP PP
PPPPPPPP
PPPPPPPP
PP
PP
PP
PP
PP
PP
TTTT
TTTT
*START* USER PCAL [1070'7,603523 dOB SHIP SEQ. 1507 DATE 14-APR-80
NONIT(JR SWS KL10E34 JilL-79. ,START*
FI6E: DSKH:SHIP T0<255>[10707 60352] CREATED: 14-APR-80 10:23:29
PRiNI'E~: 14-APR-80 1{:04:06
OUEUEi S~iTCHE8: /~IbE:FORT /COPiES:I
/SPACING:I /6.INI'Y:127 /FORMS:NORMAL
1.1:03:49
SHIPPING iNSTRUCTiONS
ISSUED 14-APR-80 1.0:23
SHIP T(] :
VENTURA, CALIFDRNiA 9300.~
PCCC
bY GHB PCCC
/
¥¥
V¥
¥¥
YV
¥¥
VV
YV
¥¥
¥¥
¥¥
V V V V
V V V V
VV
VV'
.4)
V V EEEEEEEEEE R~,RRRRRR
V V EEEEEEEEEE RRRRRRRR
V 'V EE RR RR
V'V EE RR RR
V V EE ~R RR
VV EE RR RR
V V EEEEEEEE RR RRRRR.~
V V EEEEEEEE RRRRRRRR
V V E E R R R,R
V V EE RB RR
E E R R R R
E E R g R R
EEEEEEEEEE RR RR
EEEEEEEEEE RR RR
11111 i
111111
II
ii
Ii
II
I.I
II
i1
I.I
II
II
IiIIIi
Y¥
YY
YY
000000 000000 222222
000000 000000 222222
O0 O0 O0 O0 22 22
00 O0 O0 O0 22 22
O0 0000 00 0000 2'2
O0 0000 O0 0000 22
0 0 00 0 0 0 0 0 0 00 22
O0 O0 O0 O0 O0 O0 22
0000 O0 0000 O0 22
0000 O0 0000 O0 22
O0 O0 O0 O0 22
O0 O0 00 00 22
000000 000000 2222222222
000000 000000 2222222222
*START* USER PCAb [10707,60352] dUB SHiP SEQ.
Mf3NII'OR SWS KLlOE34 dUI,'79. *START*
FILE: DSKH:VERiEY.O02<057>[10707 bO352J CREATED:
PRINTED: 14-APR-80
QUEUE SWITCHES: /B'ILE:FORT /CDPIES:I
/SPACiNG:I /LIMiT:127 /~'ORNS:NURMAL
507 DATE
14-APR-80
14-APR-80
11:02:26
11:03:49
SCHLUMBERGER COMPUTING CE,NTEE
!0707,6(:) 1352
REEL IiEADER
LENGTH: 132 B~TES
RE[{:L NAME: P.C.A.L.
SERVICE NAME: EDIT
REEl, CONTiNUATiON NUMBER: O1
PREVIOUS REEL NAHE:
COMMENTS: LIS FORHAT CUSTOMER TAPE
TAPE HEADER
L E N G T H: 1:32 13 ':~ T g S
"tAPE NANE: 60352
SERVICE; NAME: EDiT
'.['APE CONTINUATION ,NUMBER: O1
PREVIU[J8 TAPE NAME:
COMMENTS:
DATE:: 801 4/14
[)ATE: 80/ 4/1,4
E {] t'
F'ILE HEADER
LENGTH: 62 B~'f:gS
FILE NAME: EDIT .001
MAXi~IUM PHYSICAL RECURD ,LENGTH:
PRKVIOUS ~'ILE NAME:
~'ILE COMMENTS
PASS UNE.
1024 BYTES
WELL SiTE 1N[-'URMATiON RECORD
LENG'~H:
CUMPANZ:
WELL:
FIELD:
RANGE:
T(IWN:
SECTION:
COUNT ~':
STATE:
177 BYTES
SOHIO ALASKA PETRO. CO.
PRUDE.gE BAY
13E
12N
32
N.
ALASKA
i.. A~I.A E'ORMA ~1:." E(,. IFICATiO.N
L E N G T 1~,~: ,4 5 0 B Y T E S
E N T R .~ $ L O C ]K S:
0
SIZE REP CODE ,ENTRY
1 66 0
DATUM SPECIFICATION ,F315OCK81
ENTRY lC T,OUL SVOIqD~ UNITS AP1 API API API, F'IhE~ SIZE EXP PROC SAr~1 REP DEPT SHIFT
F T 0 0 0 0 0 4 0 0 1, 68 0
GAP,I, 51 31 32 0 0 4 0 0 1, b8 0
G A P I 51 31 32 0 0 4 0 0 1 6 $ 0
CU 51, 40 1. 0 0 4 0 0 1 68 0
CU 51 40 2 0 0 4, 0 0 1 68 0
CPS 51 :/t9 99 0 0 4 0 0 1 fl8 0
CPS 51 39 99 0 0 4 0 0 1 68 0
CPS 51 1:19 99 0 0 4 0 0 1 68 0
CPS 51 39 99 0 0 4 0 0 '1, 68 0
C/C 51 42 0 0 0 4 0 , 0 1 68 0
51 43 0 0 0 4 0 0 1 68 0
0
0
0
0
0
0
0
0
0
0
0
DLPT~
10620;000
1. O600,000
105O0,000
1040(]),000
1, O 300 . 000
1,0200,000
1O100,000
1O000,000
9900,000
9800.000
9710.000
MN
EMON lC
GR
TNBK
TRAT
GR
TNBK
TRAT
GR
TNBK
TRAT
GR
TNBK
TRAT
GR
T N B K
TRAT
GR
T iq B
TRAT
GR
TNBK
TRAT
GR
TNBK
TRAT
GR
TNBK
TRAT
GR
TRAT
GR
TNBK
TRAT
VALUE
100.025
500 0~0
0:9-9
6:1.675
180.000
3.246
56.850
135.250
2.784
12. 600
14 '7.750
2.664
1,4:.850
173.375
2.438
11.575
204.625
1.899
1.9.9'75
199. 500
2.657
3 975
2 :ooo
4.141
40.725
293.375
3.1.74
78.050
270.125
4.972
100.050
500.000
0.999
MN
EMONiC
GRBU
"rFBK
T M O D
GRBU
TFBK
T M 0 O
GRBU
TFBK
T:MOD
GR,BU
TMOD
GRBU
TFBK
TMUD
GRBU
TFBK
T M O D
GRBU
TFBK
T M O,D
GR'BU
TFBK
TMOD
GRBU
TFBK
TMOD
GRBU
IFBK
TMOD
GRBU
I:P'BK
TMOD
V AL UE
500.0OO
20O.O5O
3.999
59.441
38.700
0.9'76
55.694
16.400
1.730
12.238
1 ]. 800
1.730
1.4.735
17.900
1.730
11.364
22.900
1.730
1.9.855
22.200
1.731
.967
.100
1.730
41.209
46.300
1.000
78.796
41.450
1,000
5OO.O0O
200.050
].999
MNEM[]N IC
$IGM
T N G
51 G M
TNG
8IGM
TNG
5IGM
TNG
51 G M
'TNG
$ ,I GM
TNG
$ IGM
TNG
$IGM
TNG
$IGM
TNG
$1GM
TNG
SIGM
TNG
VALUE
0.015
1000.000
33.455
250.062
21.'734
146.1,40
1.9.680
2,35.573
16.233
316.013
14.029
386.210
19.575
151.137
24.567
177.61'7
22.273
798.151
38.431
295.528
0.030
1000.000
MNEMON 1. C
F$IG
TFG
F$IG
TFG
FSIG
TFG
FSiG
TFG
FSiG
TFG
F'8 ,I G
TFG
F$IG
TFG
FS,I G
TFG
FSIG
TFG
FSIG
TFG
FSIG
TFG
VALUE
0.01,5
499.875
28.988
~1.439
19.21,0
53.447
10.151
50.325
15.236
73.551
12.05'7
153.°721
1~.496
54.945
20.230
48.'701
19.150
1'10.205
40.085
38.961
0.015
499.875
S[.IgMAR¥ OF" DATA RECORDS
.NUMBE.R'OF RECORDS: 80
I,ENGTH [JF RECORDS: 1018 BYTES
I.,ENGTH O~' LAST RECORD: 182 BY'rES
[" iLE TRA ILE}~
L,I.;N G'.I' H; 62
[~" l I.,E NANE: El) .IL T .O0f
MAXIHUM Pld¥31CAL .REC[J.HI) LENGTH
NEXT ~ILE NAI4E:
1024 B~TES
HEADER
I,, E N G T.B: 62 B Y T E S
F .'[ LF, NANE: EDIT .002
MAXI. MUM PHYSICAL RECORD LENGTH:
PREVIOUS FII.,E NAME:
FILE CO~q~ENTS
PASS TWO AND PASS THREE.
1024 BYTES
SiTE 1NFURMATION RECORD
[, E N G T H:
CUMPAN¥:
W E L L:
~ IELD:
RANGE:
TOWN:
SECTI UN:
CtlUNT~:
STATE:
1.77 BYTES
SOHIO AbASK. A PETRU. CO.
PRUDHUE BA~
13E
12N
32
N. SLOPE
ALASKA
LAI?,A FtlR~qAT SPECiFICATiUN
LENGTH: 850 BYTES
ENTRY BLOCKS:
I:' Y PE
0
S i Z E
1
REP
C 0 D E
E 1'4 '1' R Y
0
D A T U M
1
2
4
5
6
7
8
9
10
11,
1,2
13
14
1,,5
1,6
17
19
20
21,
S P E C I F' 1 C A T 1 (] N
I, C T 0 U b 8 V II R D #
UNITS ,AP1 AP1 AP1 APl
F T 0 0 0 0
GAP1 51, 31. 32 0
G A P I 51 31. 132 0
CU 51 40 1 0
C U 51 40 2 0
CPS 51 39 99 0
CPS 51 ,39 99 0
CPS 5 '1 39 99 0
CPS 51 39 99 0
C/C 51 42 0 0
51 43 0 0
GAPI 51 31 32 0
GAP i 51 131 32 0
CU 51 40 I 0
C U 51 40 2 0
CPS 51 ~9 99 0
CPS 5i 39 99 0
CPS 51 39 99 0
CPS 51 39 99 0
C/C 51 42 0 0
51, 43 0 0
FILE~
SIZE EXP PROC
SAM REP DEPT
0 4 0 0 1 68 0
0 4 0 0 1 08 0
0 4 0 0 l,, 68 0
0 4 0 0 1 68 0
0 4 0 0 1 68 0
0 4 0 0 1 68 0
0 4 0 0 1 68 0
0 4 0 0 1, 68 0
0 ,4 0 0 I 68 0
0 4 0 0 1 68 0
0 4 0 0 I 68 0
0 4 0 0 1 68 0
0 4 0 0 1. 68 0
0 4 0 0 1, 68 0
0 4 0 0 1 68 0
0 4 0 0 1 68 0
0 4 0 0 I 68 0
0 4 0 0 1 68 0
0 4 0 0 1. 68 0
0 4 O' 0 1 68 0
0 4 0 0 1 68 0
SHIFT
0
0
,0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7
DEPTH
~t0620; 000
1O600.000
,tO500. 000
O400. 000
10'3'00,000
1O200.000
10100.000
10O00.000
9900.000
EMONiC
GR
TNBK
T R A T
6iGM
TN G
TRAT
8
TN G
GR
TNBK
TRAT
TNG
GR
T R A T
$I GN
T N G
GR
TNBE
TRAT
$iGM
TNG
GR
TNBK
TRAT
SIGN
TNG
GR
TRAT
SIGN
TNG
GR
TNBK
TRAT
SIGM
TNG
GR
TRAT
SIGM
TNG
'VALUE
0. 000
499.625
1.001
0.015
1000.000
61.825
260.000
3,322
,42,268
794.654
57 25
2 s: oo
3.05,4
21.284
166.125
18.025
238,500
2,614
19,276
293.030
18.350
236.250
2,41,2
18.001
335,998
14.050
250.500
1.872
13.760
358,981
23.750
269.000
2.720
19.635
200.100
46.025
277.000
3.797
23,682
264.801
43.275
364.250
3.141.
22.498
909.068
MN
E M O N i C,
GRBO
TFBK
T M [) D
[.;"S I G
T F G
GRBU
TFBK
TMOD
FSIG
TFG
GR,B O
T'P'BK
TNOD
FSIG
TFG
GRBU
TFBK
TMOD
FSIG
TFG
GRBU
TFSK
TMOD
FSIG
TFG
GRBU
TNOD
~SIG
TP"G
GRBU
'IFBK
TMOD
F~IG
TFG
GRBU
TMOD
fSIG
TFG
GRBU
TFBK
THUD
FSIG
TF G
V A b [J Pi
O. 125
200.0O0
3.998
0. () 15
499.8'75
69.680
39.100
0,998
35.826
1,64.585
61.8 ! 3
23,050
1,730
18.3 '70
41.833
16,484
22,100
1.730
16,211
68,057
18.232
23.250
I. 7:30
1. 3. 842
81.668
13.611
30.600
1.730
10.737
107.767
26.474
27.600
1.731
16.961
55.320
44,705
44.250
1.730
20.350
54,O71
50,200
53.900
1.155
18.940
172,702
MN
EMI.iN lC
SIGN
TNG
GR
T,NB~
TRAT
SIGN
TNG
GR
TNBR
TRAT
SIGN
TNG
GR
TNBK
T R A T
SIGM
TNG
GR
TNB~
TR.AT
SIGN
TNG
GR
TNB5
TRAT
SiGH
TNG
GR
TRAT
SIGN
I'NG
GR
TNBK
TRAT
$1GM
TNG
GR
TNB~
TRAT
S1GM
TNG
GR
TNBK
TRAT
VALUE
0.090
999.500
100,050
500.125
0.999
30.667
240.5'70
65,900
345.625
3,417
20.1.75
112,166
03,825
300.625
2.924
19.096
288.0,34
19.425
301,625
2.382
15.738
244.06"1
21.475
312,500
2,339
13.610
387.959
14.150
.308.000
1.907
19.680
198.101
33.125
320.000
2.563
23.128
209.593
35.425
325.375
3.742
22.363
2.748
47.~50
401.000
3.149
MNEMUN IC
F'SIG
TFG
GRBU
TFBK
FSIG
TFG
GRBU
TMOD
FSiG
TFG
GRBU
T F B g
TMOD
F$IG
TFG
GRBU
TF'BK
TMOD
,FSIG
TFG
GRBO
TFBK
TM(JO
P"SiG
'rFG
GRBU
TFBK
TMOD
FSiG
TFG
GRBU
TF8~
TMUD
FSIG
TFG
GRBU
TFBK
TMOD
FSIG
TFG
GRBU
TFBK
TM£)D
VALUE
0,015
499.001
500.000
200.050
3.999
26.228
29,471
65.684
52,200
0,576
19.750
25,599
62,937
29.100
1.7,30
15,836
58,94:1
19.356
28,500
1,730
14.876
59.441
21.603
29.500
1.730
11.892
121.,254
13.986
33.100
1.730
1'7,681
51.692
34.091
34.600
1.730
20.050
~9.825
39.080
51.400
1.730
1~.760
1'/9.570
50.574
61.400
1.000
D E P T H
'9800 ;000
971. 0. 000
MN
~ON lC
GR
'I'NB,K
TRAT
SIGM
TNG
GR
TRAT
SIGM
TNG
VAL
83
316
5
3 8
333
100
500
0
0
1.000
U E
.3
.7
.1
.5
.9
.0
.I
.9
.0
.0
0 O
5O
81
36
99
5O
25
99
15
00
MN
EMONIC
GRBU
TFBK
T M (] D
6'iSIG
T F G
GRBU
TFBK
TMOD
TFG
V AL U
85.
46.
1.
,40.
51.
500.
200.
4.
() .
499.
1,6
95
00
07
82
O0
05
00
O0
87
MNEMONIC
S IGM
TNG
GR
TRAT
8IGM
TNG
GR
TNBK
TRAT
V A b U E
40.005
269.548
81.100
377.000
4.984
0.015
1000.000
1,00.050
500.125
0.99'7
MNEMON lC
FSiG
TFG
GRBO
TFBK
TMOD
FSIG
TFG
;,. GRBU
.TFBK
TMOD
V A,b U B
42.109
41.708
81.044
52.b50
1.000
0.000
499.8'15
500.000
200.050
4.000
SUMMAI~ OP' ,DATA RECORDS
NUMBER 'OF RECORDS: 1,52
~1"
I,,,ENGIH OF LAST i-~E:CORD: 762
[;' I, I- E', T R A 1 L, E R
I,,ENGT,H: 62 BYTES
FILE NAME: ED,iT .002
~IAXI. IV~UM PHYSICAL RECORD LENGTH:
.NEXT FILE NAME:
024 BYTES
F lI,,,g ,BgADER
L`ENG'I'}~: 62 5~TES
FILg NA.~E: gDIT
MAXIMU,N PHYSICAL R
PREVIOUS FILE NAME
Flbg COMMENTS
PASS 4 AND PASS 5.
, , ,. , , , , ., ,. ,
,1024 BYTES
WELL SITg INFURMATION RECORD
L E N G T H:
CI'IMPA N Y:
WELL,:
["; IBLD:
RANGE.,:
TOWN:
SECTION:
CtIUNT ~':
STAT[::,:
177 BYTES
SOHIO AL,ASKA PETRO. CO.
PRLIDH,OE
1BE
12N
32
N. SL.OP~
AbASKA
r/ ¸O
DATt FORMAT SPECiFICA, T1ON
[, EN G TH :' 8 5 0 B'~[ T E S
0
SIZE REP COD~~. ENTRY
I 66 0
DA'I'U M 8PECIF ICATI(]N
BN TRY
i C T.O O L
$'VORD# UNITS AP1 API AP1 API Fi,hE# 61ZE EXP PROC SAInt ,REP DEPT
FT 0 0 0 0 0 4 0 0 I 68 0 0
G A P I 51 31 32 0 0 4 0 0 1 68 0 0
GAPI 51 31, 32 0 0 4 0 0 1 68 0 0
C U 51 40 1 0 0 4 0 0 1 b 8 0 0
C U 51 40 2 0 0 4 0 0 I 68 0 0
CPS 51. 39 99 0 0 4 0 0 1 68 0 0
CPS 51. 39 99 0 0 4 0 0 1 68 0 0
CPS 51. 39 99 0 0 4 0 0 1 68 0 0
(]PS 51 39 99 0 0 4 0 0 1, 68 0 0
CIC 51 42 0 0 0 4 0 0 1 68 0 0
5 1, ,4 3 0 0 0 4 0 0 1 b 8 0 0
GAPI 51 31 32 0 0 4 0 0 1 68 0 0
G A P I, 51 131 :32 0 0 4 0 0 I 68 0 0
C U 51 40 1 0 0 4 0 0 1 68 0 0
CU 51 40 2 0 0 4 0 0 I 68 0 0
CPS 51, 39 99 0 0 4 0 0 1 68 0 0
CPS 5'1 39 99 0 0 ~ 0 0 1 b8 0 0
PS 51 39 99 0 0 4 0 0 1 68 0 0
PS 51 39 99 0 0 4 0 0 1 68 0 0
C/C 51 42 0 0 0 4 0 0 i 68 0 0
51 43 0 0 0 4 0 0 1 ~8 0 0
D k P T
1 '0 6 2 0 ,' 0 0 0
10600. 000
1 O500. 000
10400. 000
1, O 300 . 000
10200. 000
10100.000
10000.000
9000.000
GR
T R h T
S IGM
T N G
GR
TN,BK
TRAT
SIGN
TNG
GR
TRAT
SIGN
TNG
GR
T,NBK
TRAT
SI. GM
TNG
GR
TNBK
TRAT
SiGM
TMG
GR
TNB~
TRAT
SiGM
TNG
GR
TRAT
SIGM
TNG
GR
TNBK
TRAT
SIGM
TNG
GR
TNBM
TkAT
SIGM
TNG
VALUE
100.025
500.125
0.99'7
0.015
I000.000
62.975
3'71. 625
3.366
41.819
6'79.990
68.450
309 50
1,9.845
14: 5. ,391
22.825
316.250
2.612
17.597
242.318
20.600
326.750
2.640
16.383
306.520
18.725
338.250
1.765
13.250
305.521
32.975
328.500
2.580
19.845
218.336
47.750
343.125
3.825
23.607
220.834
52.250
410.500
3.060
22.768
210.092
MN EM[,] N IC
GRBU
TFBK
TM(3D
P'SIG
TFG
GRBU
TFBK
TMt~D
fSIG
TFG
GRBU
TFBK
TMOD
TFG
GRBU
TFBK
TMOD
~'$IG
TFG
GRBU
TFBK
T M £) D
TFG
GR B U
TFBK
T M O D
kSIG
TFG
GRBU
TMUD
FSIG
TFG
GRBU
TFBK
TMUD
P'SIG
TFG
GRBU
T?'BK
TMOD
~SIG
TFG
VALUE
500. 000
200. 050
4.000
0.000
499.875
62.313
55.300
0. 942
38.015
1, 20. 005
67.308
32.150
1,.730
17.756
43.581.
23.976
29.400
1.730
15.521
4,4.,331,
20.355
31.700
1.730
15.011
66. 309
18.856
37.050
1.730
11.637
81.918
33.342
33.200
1.730
17.516
43.207
38.836
51.600
1.730
18.190
6:3. 437
50.699
61.750
1.000
20.320
35.340
M N E M 0 N I C
SI, GM
TNG
GR
TNBK
TRAT
6IGM
TNG
T'NBK
TRAT
8IGM
TNG
GR
TNB~
TRAT
8iGM
TNG
GR
TNBK
TRAT
SIGM
TNG
GR
TRAT
SIGM
TNG
TRAT
SIGM
Z'NG
GR
TNBK
TRAT
SIGM
TNG
GR
I'NB~
SIGM
TNG
GR
TNfl~
VALUE
0.015
1000.000
100.025
500.125
0.999
35.388
545.341
72.400
382.1,25
3.475
22.573
145.891
56.625
325.625
2.854
18.886
220.834
21.700
316.250
2.,542
16.8'17
291.531
24.725
317.500
2.390
14.000
506.370
23.~50
332.000
1.830
19.171
211.841
2b.300
337.500
2.681
24.177
200.595
50.650
343.125
3.~77
22.888
959.5,30
55.125
375.250
3.234
MNEMON lC
FSIG
TFG
GRBU
TFBK
TMOD
FSI, G
TFG
GRBU
TFBR
TMOD
FSIG
TFG
GRBU
TMUD
FSIG
TFG
GRBU
TFB~,
THUD
FSIG
TFG
GRBU
TFBK
TMOO
FSIG
TFG
GRBO
TFB~.
'rMOO
FSIG
TFG
GRBU
TFBK
TMUD
FSIG
TFG
GRBU
TFBK
TMUD
FSiG
TFG
GRSU
TFBK
TMOD
VAbUE
0.000
499.875
500.000
200.050
,3.999
31.05'1
1,00.714
72.927
50.900
0.576
18.490
34.840
65.684
33.000
1.'730
16.016
58.566
21.60,3
31.800
1.730
13.902
81..918
25.225
29.250
1.730
11.232
1~3.711
1.853
35.050
1.730
10.691
51.324
27.972
30.400
1.730
20.440
55.569
42.083
5'7.350
1.730
19.675
174.201
53.447
48.800
1.730
DEPTH
'9800;000
971,0.000
MNEM[)N lC
GR
TNBK
TRAT
$ IGM
TNG
GR
TNBK
TRAT
$IGM
T:NG
VALUE
83.1
375.6
,4.9
39.1
31 '2.2
-999.2
-999.2
-999.2
-999.2
-999.2
25
25
27
51
66
5O
50
5O
5O
5O
MN
k. M 0 N I C
GRBU
TFBK
TMOD
F$IG
TFG
GRBU
TF'BK
TMOD
FSiG
VALUE
84.166
50.800
1.000
37.881
50.325
-999.250
-999.250
-999.250
-999.250
-999.250
MN
EMONIC
SI, GM
TNG
GR
TNBK
TRAT
SIGM
TNG
TNBK
TIRAT
VALUE
3 g 1
207;2
88.5
385.6
4.6
-999.2
-999.2
-999.2
-999.2
-999.2
51
99
O0
25
20
5O
5O
5O
5O
5O
MNEMUNIC
TFG
GRBU
TFBK
TMOD
FSiG
TFG
GRBU
TFBK
TMOD
VA~UE
40.91,0
4$.082
88.601
51.550
1.000
-999.250
-999.250
-999.250
-999.250
-999.250
S[]~,~AR ~ O~~ DATAr R~;CORDS
N[I~4B~;R ' OF RECORDS: 1,52
LENGTH OF RECORDS: 1014 BYTES
I'.,ENGT.B (IF LAST REC('IRD: '162 BYTES
,* * * * * * * * * * * * * * * *
~'~ I L, L T R A i L E R
hENGTH: 02 BYTES
FILE NAME: EDIT .003
MAXIMLIM PHYSI, CAL RECORD LENGTH:
NF;×T Fi,LI~2 NAME:
1.024 B'YTES
, * , , , * , , , * , * , , , *
F; 0 F
, , , , , , , , * * * , , , , ,
F" ,I L E; H E A D E R
LENGTH: 62 BYTES
F.ILE NAME: EDIT' .004
MAXIMUM PHYSICAL RECORD LENGTH:
PREVIOUS FILE NAME:
F1LE COM~IENTS
PASS SiX.
I 024 BYTES
WELL SITE iNFORMATION RECORD
BENGIB:
CtIMPAN Y:
WELL:
[ I ELD:
RANGE:
TOWN:
SECTION:
COUNT~:
STATE:
177 BYTES
SOHIO ALASKA PET~O. CO.
PRUDH[)E BAY
12N
32
N. SLOPE
ALASKA
DATA ~ORMAT SPECI~'ICATION
bEbiGTM: 450 B~'TES
ENTR~: BLOCKS:
TYPE
0
SIZE REP C(]DE ENTRY
1, 66 0
DATI.1i~i SPECI,FIC&TI(]Ixl BLOC:RS;
1, C TO 0 b
2
SV{JRD~, UNI:,TS AP1 AP1 AP1 AP1 I:;'i,LEi~ &IZE EXP PROC SAM REP DEP'I,' SHIFT
FT 0 0 0 0 0 4 0 0 1 08 0 0
GAPI,i 51 31 32 0 0 4 0 0 1 68 0 0
GAP 51. 31, 32 0 0 4 0 0 1, 68 0 0
CU 51 40 1 0 0 4 0 0 I 68 0 0
C U 51 40 2 0 0 ~} 0 0 I 68 0 0
CPS 51. .39 99 0 0 4 0 0 I 68 0 0
CPS 51 39 99 0 0 4 0 0 I 68 0 0
CPS 51. 39 99 0 0 ,4 0 0 1 68 0 0
CPS 51 39 99 0 0 4 0 0 1 68 0 0
C / C 51 ,42 0 0 0 4 0 0 1 68 0 0
51 43 0 0 0 ~, 0 0 1 68 0 0
'7
DE PTH
10620; 000
1 0 6 0 0.0 0 0
tO500. 000
10400. 000
10300.000
1.0200.000
10100,000
10000.000
9900.000
9800,000
9710.000
~ ,Iq
GR
TEAT
TNBK
T R A T
GR
TNBK
TEAT
GR
THAT
GE
TNB~
TEAT
GR
TN,BK
TEAT
GR
TNBK
TR, AT
GR
TRAT
GR
TNBK
TEAT
GR
TNBK
TEAT
GR
TEAT
V A L U E
100,025
500,125
0,999
67.925
396.625
3.509
'74.275
333.3'75
3.17'7
25.075
316.750
2.469
24,050
321,750
2,492
23.525
359,125
1.954
33,125
351.750
2.726
42.350
369.500
3.059
57.725
410.000
3.16~
89.000
41'7.625
4.870
0.000
-999.250
-999.250
MN
EM[)N
GRB[J
TFBK
T M 0 D
GRBU
T F B K
TMOD
GRBU
T P't5 K
T M [,] D
GRBU
IFBK
T M O D
GRBU
T:M(]D
GRBU
T[,'"B g
TMOD
GRBU
TFBK
TMOD
GRBU
TFBK
T M [) D
GRBU
TFBK
GRBU
TFBK
TMUD
GRBU
'I'F BK
TMUD
lC
V A b [,1E
4,99.875
200.O50
3,999
63.811
58,100
0.576
'73.177
33. 050
1.730
24.6 ()(~
30. 250
1.730
2,3 851
29:100
1, .730
24.226
40 10~
1:73
33.092
39.350
I, .730
41,209
53,800
1.730
56.194
57.500
1.730
96.154
60.350
1.000
-999.250
-999.250
-999.250
MNEMONIC
S1GM
TNG
SI. GM
81 G M
T N G
61 GM
TNG
SIGM
TNG
S I GM
TNG
SiGM
TNG
TNG
SiGM
TNG
SiGS
TNG
SIGM
TNG
VALUE
0.015
1000,000
,38.1.'76
850.012
22.033
136.148
18. 1361
312.016
13,640
499,375
19.545
222.583
24.926
258.056
22,138
311.267
39.271
352.985
-999.250
-999.250
MNEMO.NIC
FS,IG
TFG
F$iG
TFG
F$iG
TFG
FSiG
TFG
F:SIG
TFG
F$IG
TIFG
FSIG
TFG
FSIG
TFG
FSiG
TFG
F$IG
TFG
F$1G
TFG
VALUE
0.01.5
499.875
35. 766
18'1.188
1'7,096
35.589
16.286
57.56'7
11.932
7
11.892
1.64.585
1'7.4'71
72.552
19.105
03.312
19.690
62.812
42.394
44.580
-999.250
-999.250
DATA. EECORD$
NI,,IlVlBER'~ £1F" RECORDS: 80
LENGI 't []F RECORDS: 1018 .B~'TE$
h~,; GI'I-t []F [,,AST RECORD: 18,2 BYTES
I;',ILE TRAILER
LEN G'I~}'i: 62, B~TES
FILE NAME: EDiT .004
~4AXIMUIVl PHYSiCA, I~ RECORD LENGTH:
NEXT FI. LE NAME:
TAPE TI~AILER
I.,ENGTH: 1.32. BYTES
'rAPE NAME: 60352
SER'V ICE NAME: EDIT
"]?APE CUNTI, NUATiON NUMBER: O1
NEXT TAPE NAME:
C (JMM~N ~J.'S:
102,4 B'YTE;S
DATE: 80/ 4/14
(c. sea'
e~6~Obo 000o00 5555555555 5555555555 7111 / 777'/7
066~6b 000000 5555555555 5555555555 1777'777777
66 00 0 o 55 55 '17
~t~ O0 O0 55 55 '17
e,(~ O0 0000 555555 555555 7
66 O0 0000 555555 555555
~{:{~e:oO 66 O0 O0 O0 55 55 77
66060066 O0 O0 O0 55 55 '7 1
b6 06 0000 00 55 55 '1 7
6b 6b 0000 O0 55 55 ? '1
~.~6 oO 00 00 55 55 55 55 "17
e~ 66 00 00 55 55 55 55 77
b e, 6 ~ e, e~ 0 0 0 0 0 0 5 5 5 5 5 5 5 5 5 5 5 5 7 '?
660666 000000 555555 555555 "l
* LS 1~ A R '[' ,* U,S E iq t? C. A t. [ 10 ? 0 'l, b 05.1,5_ '7 J ,,] O B L~,['i I ,P ,S ~; 0. 4.13 b I,.) A"I' b.; 1 .~ -' A U G-. 80 112: '12: 20
~(JNI!t['.]R ;5~.S ~1.10L, 37 ,APiq-80. ,8 ART*
,8Ii'A~'.I!* U&P.,P, PCAI, 1'.10707,b0557J dO~ SHIP SECa. 41.36 DA'Ii~] 14-AU(;-80 12;42:2U
N (] N .l. T (J R ,.5 ~'~ ~ ,K ~ 1 0 g .~ '1 A P R' 8 0, * ,5 T A.R']IL' *
SSSSSSS5 HH. hid
SSSSSS$S H~ Hid
S S l-i H lq M
S S H ~ H h
SSbSSS NHhHI-iHiMHtiH
I1
11_
Ii
Il [.1
i.I Il
11
I1
I1
I1
i1
1. i
1I
I1
ii
11
II. IL l
PPPPPPPP
PPPPPFPP
PP PP
PP PP
P P FP
PP PP
PPP~FPPP
PFPPPPPP
PP
PP
PP
PP
PP
PP
T 'l .,7' f T T 7 'IL' '1' '1 Ij (j tO D i) LI
T ~.' '.1' 1' I?'l' 1'1~: '11
']. l? LI t.i () ~.,
T ~ £.1( ) l,J U
tr 'I! O U L) O
I' 17 t.j O f, ) (j
1: T CI (j O U
T '1~ iii 0 1.,) LJ
T T O U O u
't T Ii.) [J 0 [3 t,J U
T T u,(o [.) o U 0
*6'I'ART* bSb~ PCA.L, 1.10'707,60,5,i5.'7j dti~ Ship ~.,~. 41.]6 DATI:; 14.-AUG-80
MilNI,"["I. JP, ~:fi itLl.(.)E.37 AP.R-80. *,5 A
t' iL b E;: I) 8 i',l~;h it: S,.i ~x~tt 'TI P~., O' T(.J; 41 42_5- A5 >O G[ -1 08 0 ? 0 71 ~ 6:04 52 5:4'14'1 C P, ~ A T fi; D: 1 ,t - A U G ,- 8 0 1 1; 5 g: 5 6
ii t,.,1 g U I~; S 'w 1. ~' C H E; 5: I t; I.. 1., E,: ~ t.] ~ T t C ID P I k ,S .' 1
/bP/4CI. I~G:I /b.l. 141'1' :1. 2 '2
12:42:20
S}t ..lf'
PCCC
5~IPPING ibS'.~RUCT I{~N&
1SSO[~D I,]-AUG,-60 .1.!:59
CAI, ii- bi~N 1 A
PCCC
(, (
111111
Iiiii1
11
11
i I
lI
]1
]1
11
11
11
]I
1iiiii
Ii111I
YY
Y~
000Oi:~O O000uO 222222
0o0000 000000 222222
0 {) 00 0 U 0 0 22 22
0 O 0 L) 00 00 22 22
0 o O 0 {') 0 0 0 O 0 0 0 2 2
00 (', 0 U 0 00 0000 22
0 0 0 0 0 0 0 0 0 0 0 0 2 2
00 ti) 0 O 0 00 00 00 22
000U u0 000f 00 22
0000 O0 0000 O0 22
00 U 0 0 0 00 22
0 0 0 0 00 00 2 2
000000 000000 2222222222
000000 000000 2222222222
~t36 DA'I' ~.
1,4 - A U G- 80
1.4-AUG-80
12:30:50
12:42:20
8. CitbUMBLRGLR CO~4PU I'
10707,00551
PE, kL h kA D ki-',
[,kaIG'l id: 132
1', ~, E.L, NAPE: P.C.A.b.
8kgV I. CE NAi~k: El.) I '1
iq' E; kb CiJN'I' 1N U A'[ 101'~
C{..~b'~Mu, r~'8: .bls F[iRr,~A[~ CIJSIU[~'tER 'tAPE.
I)A:I'I~: 80/ 8/14
'l?APk
l.,k I,i (,,'1 ~: 132
I'APE NAN,,: 0055'1 DAT~;: 80/ 8/14
5~,~V JCk NA~E: EL)Il
TAPE C[JNTINUATION NUHBER: O1
f'Rf.~iC.Jtt~ '].'APE. NAN~J
CUMI~ENI'~: LINI~'Uk Wg.[.L, IDkNI'lk.I. CATIUN i'4UNbNB 1~ 50-029-20388
024 BYTE8
~..i.,l~ 8.II'E; [NI. OIRMATI. Ui'~ RkCORD
1,7'7 BYTE;8
,.fiU.itlU AbASKA PkTRU. C(].
Fi-6
P R U D H.I.'] E B A ~
1 3
12N
ALAS~,A
t,LNG'I ~: ,:150
0
s1zr~
1
6b
0
I')A'I:~.~M ,.SPE, C.I,I~ ICAIltJN
tJ~ lis AP
I AP1
F'I' 0 0
GAl-' 1. 51 31 3
GAP1 5i ~1 3
CU 51 ti0
CO 51 4O
CPS 51 39 9
CP,S 51 J9 9
CPS 51 39 9
CP~ 51 39 9
CtC 51 42
bl 43
1
0
2 0
2 0
1 0
2
9
9 0
9 0
9 0
0 0
0 0
f liaL~
REP
0 4 0 0 I b 8 0 0
0 4 0 0 1 08 0 0
0 4 0 0 1 68 0 U
0 ti 0 0 1 08 0 0
0 q 0 0 1 b8 0 0
0 4 0 0 1 08 0 0
0 4 0 0 1 o~3 0 u
0 4 0 o 1 b8 0 0
0 4 0 0 ] 68 0 0
0 q ,) 0 I 68 0 0
0 § 0 0 1 08 0 0
'U k, F 't
l u625. 000
10600.000
10500.000
O400. 000
10 ilO0. 000
1 O2OO. 00O
10100.000
It 00~0 . 000
9 9 00 . () 0 0
'98 ~ 0.000
97 1 0. 000
TR
'I k A 'I'
T R A '1
G H
T N B ~,
T h A
GR
'1 bi B K
TEAT
GR
~[ NB.K
T H A I'
I'P, A T
qt' i',l B ,~,
T R A I
TN BK
T R A T
G R
I' .lq b 1<:,
'I l{ A '.['
T' };t A T
-999.0OO
-999. 000
-999.000
20U.O00
500.000
1.000
54.100
121.220
3.213
10.850
1.45.589
2,b45
1 I. 25(.)
1.75.581
9.450
202.07~
1.
20.900
222.069
2.605
.33.05 o
251.1,8'7
2 · 3.3 1
44. b 00
290. ,427
3.073
8O. 250
295. ,30 1
,4. 435
- 999.250
-999 . 250
-999.25O
~Mt.~iq lC
GRB O
T.rq L~ D
G.Rt3 O
Gl<BO
'I'F BK
'1' t.'! U D
GH B U
1[- BK
1' f4 [.J D
GHbU
TI' bK
'1' ,~,'1U L)
GRPJU
T.[' BK
TM 0 D
GR B tJ
"I't' BK
'1,' M U ,D
G R B O
I
GRBU
I'MI)D
G R b U
%, ALLI
-999.
-999.
-999.
q (.)9.
20 0.
5~t.
15.
1.
11.
14.
1.
12.
24.
1.
,.~ ,il.
41.
1.
201.
53.
1.
42.
1.
79.
- 999.
-999.
-999.
0 O0
000
() 00
875
000
gq9
558
150
732
700
731
bi2
450
732
859
900
731
458
80O
'131
'748
800
'732
810
] 50
731
9 O0
5 () 0
00 1
250
25 0
25O
~1 b)L MuN lC
b i Gt',l
'r N (,;
& J, GM
1' N G
b IGM
T N G
,S l G M
b [ G M
',l' N G
~ING
~ 1 G tvl
'r .N G
TNG
5I,.GM
T N G
5 ,.t g ~t
T N G
VALUE
-999.000
-999.000
0.015
lO00.OOO
20.599
954.557
18.b02
952.u~4
931.330
13.873
939.82b
19.070
915.35b
22.996
8'15.905
22.~52
8'75.15b
38.0 0 7
8 52.434
-999.250
-999.250
i,1 ~'~ L bi u ~ 1 C
?'sig
Tb G
['SLG
FSIG
I'FG
FSlG
TFG
t"'8 IG
'I'FG
FSiG
TI'"G
TFG
t~'S IG
TFG
T F G
I' FG
-999.000
-999.000
0.015
500.000
18.207
46q.784
lb.lbq
450.283
14.b85
12.003
442.bb8
1 b. '108
~'l .539
19.990
41 't .0~2
19.585
431.052
39.096
429.553
-999.250
-999.250
S [J r~l Fi A i~ ~. U t' l) a T g lq k,C u H 1.) 5
r',It.t~vlBElr¢ (.jk BkCLJRL),SI Bt.)
LEi'.~GIr~ U~ H[.CUkt)S: 10i8
I_I.,E; ']'i4A 1 bEE
102~
FIb.E ttEADEIq
1024
;SUH1U /4LAbKA PE'I"~I..i.
1,3E
N. SL,.G F: g
ALASKA
C t).
lYF'd,
SIZk
1
bk, PI
GH i L)'I'N
GHBII
51GN '.[DI'N
f 5I G qDTM
TI" bi',, '1.£)'~
,I' ~l G [ I':,'t
'l'f G
'I NOD 1D'I'~M
GR 'I 0I fv~
G },: 8 tJ T D ~' M
S 1. G
~ &
':t' i,~ B ~, 'T D 't' ['4
T [" B K i D T
]' N G I D T
'1'~' G ',I DTN
'1' ~ A '][' :L 13 "[' {vi
I' M (J D T
GAP,I.
(;APt
C U
C u
CPS
CPS
CPS
CPS
C/C
GAP .1
GAPI
CO
CU
CPS
CPa
CPS
C/C
AP
AP1
AP1
Al-' t
0 0 0 0
bl .31 32 0
5t 31 32 0
51 40 1 0
.51 40 2 0
bl 39 99 0
5i .]9 99 0
51 J9 99 0
5i 39 99 0
51 ~}2 0 o
51 ~3 0 0
51 31 32 0
..5l 31 32 0
bl 40 1 0
51 40 2 0
b 1, 39 99 0
51, 39 99 0
51 39 99 0
51 39 99 0
b I ~2 0 0
.51 43 0 0
['
~ SiZ~ LXP
PROC
,SAM
RI.:P
DLPi' Sttll~ 1'
0 ,'~ 0 0 I o 8 0 0
o ~* 0 0 1 08 0 0
0 4 0 0 1 08 0 0
0 4 0 0 1 o8 0 0
0 4 0 0 1 68 0 u
0 4 0 0 1 08 0 0
u 4 0 0 1 08 0 U
U 4 0 0 I. 08 0 0
u 4 0 0 1 ~ 8 0 0
0 4 0 0 1 b 8 0 0
0 4 0 0 I ~ 8 0 0
0 4 0 0 1 o 8 0 0
0 4 0 0 I 08 0 0
0 4 0 0 1 08 0 0
0 4 t.) 0 I ~ 8 0 0
O 4 0 0 1 68 0 O
0 4 0 0 1 ~ 8 0 0
0 4 0 0 1 O U 0 0
0 4 0 0 1 68 0 0
u 4 0 0 1 0 ~ 0 0
0 4 0 0 i ~8 0 0
10500. (~00
040O. 000
1 O300. 000
10 100.000
t 0000.000
9 u, 00.000
M r,~ ,t, t'3 t.J N 1 C
TRAI
S 1 (;M
GN
'i' HA 'I
~IGM
'i' N G
GR
T N t-5_
1RAY
i' H G
TNBK
5,1 G g
I' N G
'I N B h
'i'I~.A ],'
81 G,M
TN G
T R A T
$ I G M
T hi G
I' N ,B K
T R A T
T N G
I' N B ,K
T }< A T
,T NG
G R
'[' N B K
T P, A T
$1 G M
I'NG
VAL
-999
-999
-999
59
0
199
1
0
1000
52
2i5
19
949
13
28.4
2
18
929
287
2
16
931
13
326
1
13
945
23
320
2
20
916
38
.,~37
3
23
55
4O ~
2
22
893
U L
.
.000
.000
.955
. '? 49
.900
.00()
.001
.015
.000
.350
.181
.9'74
.910
.554
.525
.951
.838
.300
.0'78
.255
.524
.086
.500
.043
.865
.498
.318
.7 () 0
.170
.50b
.300
.354
.150
.666
.21 :~
.296
.421
.35O
.52 .~
.890
.0,37
.13~
LHUm lC
G~ ~3U
1 iq lJ D
?SIG
GRbU
I'P
:tHUD
?8iG
t'kG
GRBU
1' M t,I D
'I'P'G
G14BU
TP'BK,
"1 M U D
~IG
'i/FG
GRBU
TP BK
'1 M [3 O
FSi G
G 14 B U
T M 0 D
P'SIG
T.FG
G14~ U
[,'S I.G
GRBU
TFB ~L
T F (3
VA6
-999
-999
'999
59
0
499
200
0
5OO
54
28
1
27
1
lO
~59
16
29
1
14
451
13
35
1
11
450
38
1
443
221
60
1
17
52
57
19
43 e~
UE
. o 00
.000
.000
.955
.375
.875
.000
.gq9
.015
.000
.432
.950
.732
.948
.527
.733
.850
.731
.b78
.150
479
,~ 00
732
.221
.786
.10'9
.000
.7 32
. ~43
.287
.452
.700
.7.32
.169
. 043
.973
.550
.731
.8:1 '7
.063
.559
.05O
.001
.40~
k M ( t t'~ I C
blGF!
£NG
'l'tqAl'
TNG
'I lq A 1'
61 G 1,1
1' N G
'INBK
I'R A 1
61GM
TNG
GR
'I iq A i
;S .I G M
TNG
GR
I' N i-3
TRA 1'
TNG
GR
TRA T
TNG
GR
T N B K
TRAT
b I G M
TN(.4
GR
TNBK
TRA .1'
&IGM
T N G
GR
T R, A '£
V .A L, 0 L
-999.000
-999.000
O.OOO
0.000
5.000
0.015
999.~50
199.900
499.875
1.001
21.qb8
935.081
57.900
~35.5tl
2.8~8
18.532
929.838
1, 6. ~()0
350.412
2.416
16.449
936.579
18.500
356.161
2.3~1
1,4.112
939. 825
19. ,300
,:370. S 32
I. 84'1
19.820
922.846
28.300
3'78.155
2.5'71
23.506
859.925
43.~50
:378.155
3.21~
22,457
888.389
56,900
44(1.5:15
3,019
lq,~ LIqUN lC
T [. G
TF 15N
TMUD
i'P'G
GF,~U
TMUL)
P$1G
GRdU
I'FflK
TMtJD
'tFG
GRBU
'raoo
GRBU
T~'BK
FSIG
TFG
TMOO
FSIG
TFG
GRBU
TFBK
TMOD
FS ,IG
TFG
TF'OK
FSIG
TFB.F',
"t'MOO
-999.000
-999.000
0.250
0.000
0.0O2
0.015
bO0.O00
499.U75
200.000
3.999
1~.993
~49.o~3
50.929
1,131
1'~.229
453.160
15.4u1
32.300
1.732
14.281
458.531
20.474
34.600
1.731
11.808
45o. 03 7
18.002
39.450
1. '13 1
1b.84,3
456.408
39.5'70
49,400
1.131
20.155
393.080
199.750
62.400
1.732
18.710
q34.549
bi.b50
1.i03
¢7i. 0,000
M.~kMtjN lC
'1N G
Gl-<
T.N Bi~,
51GM
VALUE
80.0
375,1
_~8.2
~55,9
-999.2
-999.2
-999.2
-999.2
-999.2
00
5~
5O
~7
.~ 0
5O
50
5O
5O
50
1' bl ( ) D
i'SIG
'I'F G
'If: G
V AB UE
~7.9
I.O
38.8
4'4.1,6
-999.2
-999.2
-999.2
-999.2
-999.2
9~
O0
O1
41
5O
5O
5O
5O
5O
MNEMONIC
5 IGM
TNG
'rNB~
T k A 1
THAI
VAI~U
38.
84 '?.
85.
qO '7.
4.
-999
-999
-999
-999
-999
097
940
bOO
495
250
250
250
250
25O
P$1G
G~BU
T M U 0
TInG
GRMU
T lq O D
VALUL
3U.oOl
~24.~0~
83.b45
b~.200
1,001
-999.250
-999.250
-999.250
-999.250
-999.250
SU!q~,,AF~'~ U? OATA
I,bNG'l.d d~ kkCt..l~i)~ 1014
f 11,,~, NANg: EDIt1 .002
i'.'~AXIHUH PH.~$1CAL P,E, CU~D ULNGTH:
:L 024
J 02~1
N:
:
,5 (.iH 1, {J AbA,SKA
PRUUH{]E, bAY
32
N. 8 hO P ~
Ct.).
0
1
CODE
66
( ( ("
I
$.i. GN IDI'N
5 [' S 1 G
t"5 ti. ixl~
9 T [' G 'I D T {4
0 1. 1~ A ~' T OTt,l
1 'i N (J D '1 u 't
2 GP, '1:
GHbL~ TDTb~,
'1. S 1Gt.a 2DTN
5 i. SIG
8 '1' i',l G 'I D T ~
T i..,t A 'f I' L)T
1 ']) Pi UD ? O't.FI
I. JN i'-[ S
i APl
A~
b~ O 0
GAP I b 1. 31 3
GAPi 51 31 3
C U 51 40
CPS 5 1 ,39 9
CPS 51 39 9
CPS 51 39 9
(.:PS 51 ,'.12,9 9
C/C 51 42
51 ~3
GAPI 51 31 3
GAI?I 51 3:1. 3
CU 51 4O
CI, J 5 1 ~0
CPS 51. 39 9
CPS 51 39 9
CPS 6 1 39 9
CPS 5 1 :]9 9
C/C 51 42
5 1 /~ 3
AP1
0 ',')
2 0
1 0
2 0
9 0
9 0
9 0
0 0
0 0
2 0
2 0
1 0
2 0
9 0
9 0
9 0
9 0
0 0
0 O
PROC
0 4 0 0 I ~ 8 O 0
U ~, 0 0 I o~ 0 0
0 4 0 0 I b8 0 0
0 4 0 0 1 b~ 0 0
0 4 0 0 ! b8 0 U
0 '~ 0 0 1 b 8 0 0
o ~ 0 0 1 08 0 0
0 4 0 0 ! b8 0 0
0 4 0 0 1 O 8 0 0
o 4 o o i b~ o o
0 ~ 0 0 1 08 0 0
0 -% 0 0 I ~ ~ 0 0
0 q 0 0 I b8 0 0
0 q 0 0 I 6~ 0 0
0 q 0 0 I b8 O O
0 4 0 0 I 6~ 0 0
0 q 0 0 1 b8 O 0
0 4 0 0 I 68 0 0
0 4 0 0 I O8 0 u
0 .:~ 0 0 1 b 8 0 0
0 4 0 0 I 68 0 0
I (~b2b. 000
1 ()bOO · 000
10500. 000
104. OO.000
103 O 0 . 000
10200.000
10100 . 00 0
1, 0000,000
9 9 U 0. (:) 0 0
TNb[',.
'INA1'
'I' [4 G
'£ H B K
'i' iq g l'
TNG
(; H
I'NbK
"1 MAT
SIGN
:[ i'4 G
GR
T 1~ A T
SIG~!4
I: N G
'I"RAT
$1 G
GA
T h B ~,
T iq A T
G f{
T R A T
8 I, GM
'i ,N G
GR
GA
'1' t3,{ A 1'
8
'it t',l G
VA/:
0
0
59
0
1,99
5UO
1
0
1000
bb
300
3
21
939
22
374
932
21,
381
2
16
931
19
394
13
94:2
'33
397
2
19
907
~2
399
3
23
867
54
44:1,
2
23
886
Uk
· 0 0 0
· 00 ()
.955
.749
,900
.000
.001
.015
· (30 O
.000
.179
.109
.825
.~50
.031
.538
.532
.584
.4 00
.155
,255
· 4,3,4
.151)
.:151
.715
.821,
.250
.651
.5'7~
.835
.366
. .300
.525
.260
.915
.450
.390
,858
,011
GRb U
T iq tj O
[',BIG
l FG
GNrJU
l'f' BK
~$1G
G~BU
'I ?1U L)
~81G
],'P (3
GRBU
'1' P10 D
t, 8IG
GR,t~ U
fSiG
'l'fG
Gl{BO
f$iG
TP'G
GI~i-J l)
Tf G
GRBU
T Pi O I)
G R,B 0
f,S1G
I'.F G
V AL
0
0
0
b9
0
:t99
2 O0
3
0
50O
04
35
1
1.9
461,
2..~
33
1
17
456
22
34
1
1.4
45 '1
1.9
42
1
11
449
4.3
53
1
15
450
237
1
1.9
409
49
57
I
2O
4 ,], 3
ill
.250
. OhO
.002
.955
· J75
.875
.000
.999
.015
· 000
.170
.850
,732
.466
,529
.850
.732
.323
,782
.597
.100
.732
.700
.157
.9'15
.550
.732
.823
.413
.9,45
. .] 5 0
.732
.91,4
.912
.703
.tO0
. 7 32
,555
, O68
.563
.200
.7 31.
. OO5
.800
I N G
T N b ~
IRA£
5 .I GM
I'NG
IR A'I
5 IGM
lNG
'I.'NB K
IRA't'
5 1 G M
I'NG
I'NBtS
TRA
,B1GM
't N G
GR
T N B ~,
:1' N G
T N B K
T RA
,5 i G M
T NG
GR
Ilea I
SIGN
TNG
".1: N B
T R A 'I'
T N G
GR
'I~ N B K
VALU~
59.955
0.749
0.000
0.000
0. 000
0.015
1000.000
199.900
500.000
1.001
21.078
939.825
b7.000
374.056
3.012
19.221
923.845
25.150
388.903
2.5O8
1'7.004
93:1.336
21.900
,395.651
2.410
1,4.09'7
936.829
21.000
411,272
1,836
18.757
918.352
33.200
,~14.:146
2.581
23.0 '20
866. ~ 1, 7
41.550
'41, 7. 396
]. 394:
22.50,2
02.85O
49o.126
2.89.3
FSIG
TF G
(;RBU
'.IF BK
i MDD
FSiG
'I'FG
G~bu
~$IG
GRBU
'I'FG
GRBU
Tf'BK
TgOO
TFG
GP, UU
T ~1 U i)
F$IG
TFG
GRBU
TFBK
T~OO
TFG
~i'M rid
'T FG
GRBU
P'5iG
'I'FG
GRBU
.[FBK
VAbUg
59.955
0.250
0.050
0.002
0.015
500.000
499.875
200.000
3.999
17.991
452.bb0
00.007
39.400
1.732
15.899
449.413
24.~O9
37.100
1.732
13.~87
452.bb0
20.21'1
3~.300
1.732
il.434
442.043
20.649
45,100
1.732
15.089
~50.602
57.300
1.732
20.485
40?. 1.95
231.586
08.200
1.732
19.885
431.801,
57.428
00.450
1,.001
/;
[) k, t: T H
9 ~ 0 0 o O 0 0
9'71 0.000
'I' N
$I
.ri' N
U 1'~ 1 C
BK.
AT
GN
G
BK
AR'
G b~
G
qgL
89.5
,q. 9
31.9
850.1
-999.
-999.
-999.
-999.
-999.
00
50
50
bO
50
50
1'? G
(.¢i4B U
'iF t:SK
'l'~qUD
P31G
T~G
VA
8
5
3
43
-~9
-99
-99
-99
-99
L{JE
9.513
1.250
1.001
9.051
1.177
9.250
9.250
9.250
9.250
9.250
TNG
T ~ A 'I
,51G~
'I~A 1
VALUE
37.318
863.421
bo.900
437.510
-999.250
-999.250
-999.250
-999.250
-999.250
Mt~MMUNIC
'IFB5
i~ M O D
'IFG
GR~O
VAbUk
31.t~57
442.543
84.145
53.850
1.001
-999.250
-999.250
-999.250
-999.250
-999.250
~'~titqt~.i-~ UF PE. CURL;,.b: lb3
I,E. NG'II-~ UP HI~CuHD~,: I 0.1. :}
F i.l_,k
i.,i:.',"~G'} t-~: 62 ~YTES
iL. iL b~ A t,,~ E, '- ~, D .i. 1.' ,003
i~A.x.LP!Ulv~ .P~tSIC/-\b PE, C,JHI.~ LE, NG(IH,"
1024 155~TL,5
;I~ A P' fi: "l,' R A .[ L E, h
I,) A 'I' E;: 8 () / 8 / 1 .4
8E;~ V iCE; .NANE: t,D I. I
TAPh Ct~NTiNOA'.t'IUN Nt)~.~bEP: 01.
:~.,X'I' TAPE NAI~k:
C(.)~NTS: [iN].~U~; ~,~P.,bL IDE, NT't, FJ. CATILII~i NUMB.ER I.~ 50-029-20388
(' ( (