Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout179-052David Douglas Hilcorp North Slope, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 08/27/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL T20240827-1 Log Image Files for the well listed in the table below: Well API #PTD #Log Date Log Company Log Type AOGCC Eset# PBU R-06 50029203880000 179-052 10/02/1979 SCH CBL SFTP Transfer - Data Folders: Please include current contact information if different from above. 179-052 T39504 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.08.27 15:52:26 -08'00' C. V~ C~atterton December 16, Cha',~.~' n D. BDF. 89 1986 Lonnie C. Smith Commissioner Bobby D. Foster Petroleum Inspector Mech Integrity Test SAPC PBU Pads S, M, U, R, N, T, Y, H, F, X Prudhoe Oil Pool _.W. ednesday, Nove.mber 19~ 1986: The tests began at 7:00 a.m. and were concluded for the day at 4:30 p.m. with 10 wells being tested. Thursday,. November 20, 1986: The tests began at 7:00 a.m. and were concluded for the day at 7:00 p.m. with 14~wells being tested. Friday, November 21, 1986: The tests began at 6:30 a.m. and were concluded for the day at 4:30 p.m. with lO'wells being tested. Saturday, November 22~ 1986: The tests began at 6:30 a.m. and were concluded at 1:00 p.m.; and were resumed at 6:00 p.m. and concluded for the day at 9:00 p.m. As the attached mechanical integ~tyjiQtest~ ~ ~ports show were tested, all of which met the~IAOGCC regulations. In summary, I witnessed the mechanical integrity tests on Standard Alaska Production Company's injections wells listed on the attached test forms. Attachments 6GANNED DEC 3. 9 2002 ALASKA OIL AND GAS CONSERVATION CObiqISSION bMCHANICAL INTEGRITY TEST pRETEST START 15 MIN 30 MIN ' *P *I TYPE OF PRlt CASING TBG REQ TBG TI~. TIME TIME W~, *S .____ ANNULUS TVD SIZE/WT/GRADE SIZE TEST CSG TBG TBG TBG CGvtqENTS *bi *N FLUID MD PRESS PRESS CSG CSG CSG : PRESS PRESS PRESS ,,, i ! ,,, ~ , ' '~ *, i ' I - IRJECrI}~ DRI'r~.TNG MUD i 20 AAC 25.030(a) N - NOT ~ OTHER 20 AAC 25.412(c) '~-':-' ~ -. OILIER 20 AAC 25.252(d) -":?'-~,.,':~: · % $.GANNED BEg 1 9 2002 ;:t ' ' ~. '., - "D.EWS.06 : . :-' : ., __0 .... I0N CL_~g__~,MC~ REPORT State cf Alaska 0iL & GAS C~NSERVATION COX~ISSION '4ei! :Iame Review the well file, and-c~?,-men.: on plug~/~g, well head sue=us, and !cca=icn clearance - urcvide loc. clear, code. · Code STATE OF ALASKA ALASK,~'--":_ AND GAS CONSERVATION COMMI,"'-"ON WELL COMFL~TION OR RECOMPLETION REPORT ~,~ID LOG Plugged back for CT sidetrack 1. )Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service Water Injection 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 79-52 3. Address 8. APl Number P.O. Box196612, Anchorage, Alaska 99519-6612 50-029-20388 4. Location of well at surface 9. Unit or Lease Name 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM ~ Prudhoe Bay Unit At top of productive interval!:~ 10. Well Number N/A - water injection well R-06i At total depth i ~,_ :. 11. Field and Pool 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM Prudhoe Bay Field/Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Se-Ti-al No. Pool KBD: 55.09 AMSLI ADL 028279 12. Date Spudded10/11/79 113' Date T'D' Reached ! 14' Date Comp" Susp" °r Aband'll 5' Water depth' if °ffsh°re 116' NO' °f Completions10/15/98 N/A MSL Zero 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional SurveyI 20. Depth where SSSV set121. Thickness of Permafrost 10688 9537 FTI 10535 9396 FTI [] Yes [] No I 2017 MD ! 1900' (Approx.) 22. Type Electric or Other Logs Run 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-I-rOM SIZE CEMENTING RECORD AMOUNT PULLED 20x30 Surface 144 36" 605 c.f. 13-3/8" 72# L-80 Surface 2661 17 1/2" 3863 c.f. 9-5/8" 47# L-80 Surface 9740 12-1/4" 1514 c.f. 7" 29# L-80 9227 10681 8-1/2" 336 c.f. 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) None, Not on Production 7" L-SO 9085' to 9085' 9 5/8" TIW packer at 9134' MD TVD 5 1/2" L-80 9227 '7" Otis WD packer at 10072' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9870-10072 95 c.f. Class G cmt Date First Production JMethod of Operation (Flowing, gas lift, etc.) I Not on Production ! Date of Test Hours Tested PRODUCTION OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO I FOR TEST · Flow Tubing Casing Pressure 0ALCULATED · OIL-BBL GAS-MCF WATER-BBL O~L GRAViTY-APl (CORR) Press. ~_4-HOuR RATE !28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. '1 Form 10-407 Rev. 07-01-80 SulEmit In Duplicate 29. Geologic Markers 30. _ ormation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. 31. List of Attachments Summary of Daily Reports, 32. I hereby ce~ that the foregoing is true and correct to the best of my knowledge Signed ~,a~ ~.~ Title Coiled Tubing Drilling TA Date ~/~ /(~ ~ Prepared By Name/Number: Theresa Mills 564-5894 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 KB.-ELEV = 55.09' WELLHEAD: McEvoy Conventional BF. ELEV = 21.31' 13 5/8" 5M ACTUATOR: Otis O SSSV LANDING 12017 13-3/8",72#/ft, , "~'- -- NIPPLE L-80, BTRS FOC-- ~ ! L~ ( otis )( 5.96" ID) I 7",26#/ft, L-80, TUBING ' i TUBING ID: 6.275' I I CAPACITY: .0382 BBL/FT HORIZONTAL SIDETRACK 'I. JEER: CROSSOVER I Baker Entry Guide Top at 9890 Ft. SLIDING SLEEVE I Baker Enty Guide ID= 4.00' I Otis XA 9098 ! Shoe at 12,038 ft. r ; i (4.562,, MIN. ID) I L CAPACITY: 0.0087 BBL/FT 9-5/8" PACKER t 9134 ~ ( TIW )(4.75"1D) , .~ 5 1/2" "X" NIPPLE 9187 ' ~ (Parker) (4.63" ID) =.,~!~ 5 1/2" "XN" NIPPLE · , 5 lr2;'NSoeal Assem bly 19221 . Seal) Top 7" Liner Hanger I I , I 9 5/8"47# L-80 BTRS ! 740' shoe I " ~i OriginaJ 7', 29~, L-80, BTRS liner was PERFORATION SUMMARY abandonded with cement plug from 9870-10072 ft. cement Plug was REF: LOG: None ~IZE SPF INTERVAL (~PEN/SQZ'D I'~ pressure tested with 2200 psi. I Original 7" Shoe at 10681 ft. No Perfs, I ,' [ Open hole RABakerTagT' atWhipst°ck9870 ft. Top set at 9862 -4.56' window milled from 9862~9870 ft I I ' CTD HORIZONTAL SIDETRACK TD of 4 1/2' Open Hole I 12308' DATE REV. BY COMMENTS PRUDHOE BAY UNIT 3/25/80 INITIAL RIG COMPLETION WELL: R-06ai (32-32-12-13) 11/15/89 HF RWO APl NO: 50-029-20388-01 1/7/99 cJs CTD Horizontal Sidetrack ,SEC 32i TN 12Ni RGE 13E BP Exploration (Alaska) i 31ZE 3PF INTERVAL ¢ ~PEN/SQZ'D No Perfs, Open hole R-06 Cement plug/Set whipstock 10/14/98 OPERATIONS SUMMARY: MIRU SWS. PJSM. Calibrate POS tool. RIH with POS, GR/CCL, Safe System Fidng Head, Baker Whipstock with RA PIP tag; stdng length = 40', CCL to top whipstock = 12.7'. Tie-in using CBL 10/2/79. Pull up to 9847', top whipstock at 9860'. POS orientation 27 deg left of HS. Reciprocate tool several times Jn attempt to reduce angle of tray without success. Set whipstock 29 deg left of HS at 9862'. POOH. RDMO SWS. 10/15/98 RIH with tapered nozzle. Tagged whipstock at 9862'. Established injection at 1.5 bpm @ 1080 psig. Open choke and circulate for cool down. Circulate 2 bbls Class 'G' neet cement, 17 bbls w/aagregate followed by 3 bbls neet. Close choke and squeeze cement to perfs. Attain good squeeze pressure of 1600 psig. Contaminate cement with Biozan and jet wash whipstock tray. Start POH. Over pull encountered when nozzle entered tailpipe. Attempt to RI H with no success. Appears nozzle is stuck in tailpipe. Able to continue pumping with full returns. Worked pipe in an attempt to get free with no success. Increased rate and continued to circulate bottoms up. Saw cement in returns, circulated at maximum rate until clean. Established reverse circulation. Surged pressure, pipe still stuck. Pumped 9 bbls 15% HCL acid. Cycled acid around nozzle and swept clean with gel. Worked pipe - still stuck. Circulated hole and stand-by. IA pressure has been zero throughout the job. 10/16/98 Pumped 7 bbls HCL, followed by 10 bbls Mud acid, followed by 7 bbls HCL. Cycled around nozzle. Soaked ... surged pressure and worked pipe with no success. Circulated acid out. 10/17/98 Pumped 260 bbls dead crude and worked pipe. Circulated dead crude to surface. Pumped 52 bbls of Schmoo-B-Gone. Let soak. Followed with Biozan. Swept hole circulating with 2% KCL. Pumped coil volume of N2 at 1000 scfm. Worked pipe 10 cycles to 32k#. Still stuck. Pumped nitrified gel. Surged pressures, worked pipe. 10/18/98 Pumped straight gel to clean hole. Circulated hole clear of gel. Freeze protected well with diesel. Prep to cut coil. Rigged up SWS. RIH and cut coil at 9155' (43' above coil connector). Cutter appeared at surface to have fired. Cutter hung up. Pulled line free at weak point. Cold rolled coil and stdpped injector back on well. 10/19/98 Pulled maximum on coil. Coil still stuck. Prep for second cut. RIH with cutter #2. Tag top of cutter fish at 9140'. PU to 9135' and make second cut. POH. Cold rolled coil and stdpped injector back on well. Pulled maximum and cycled pipe 10 times. Still stuck. Decide to attempt cut up inside 7" tubing above 5 lA" tailpipe crossover. RIH with cutter #3. Cut coil at 9000'. POH. Worked pipe and pumped. Still stuck. Freeze protected well with methanol. Free point calc. shows coil may be stuck up hole, possibly as high as 5650'. Call out slickline. Prep coil for slickline LIB run. 10/20/98 Made two runs with LIB. Found impression of coil end @ 9045' wlm, verifying that the coil is cut. Circulate seawater to warm wellbore. Pump 60 bbls of 15% HCL acid down backside. Wash 7" tubing from 4500' to 7000' with acid (4 cycles). 10/21/98 Circulate out acid. Freeze protected well with methanol. Worked pipe to 34k# pull. Still stuck. Call for 'Free-Point' tools. Rig up SWS and Peak crane. Cut and prep coil at surface. RIH with APRS free-point tool. Found coil to be stuck at 6500' and free at 6000'. Decide to cut coil at 6000'. Rig up to cut coil. RIH with cutter #4. 10/22/98 Cut coil at 6000'. Good indications at surface that cutter fired. POH with cutter. Pulled coil free with crane. Set slips and cold rolled back to coil. Stdpped injector back on well. Coil free, POH and recovered 6000' of coil. Blew coil down with N2. Rigged down DS CTU #2. The well was left with approximately 3205' of 1.75' coil in the hole including the BHA (3" Tapered Nozzle w/5' - 2" dia. stinger). The top of the coil is at 6000' with additional cuts at 9000', 9135' and 9155'. The nozzle is believed to be stuck inside the tail at 9204', below the 51/¢, 'XN' - nipple. The pipe is known to be stuck below 6000'. The well is freeze protected with methanol to 2000'. The perforations are squeezed. 11/5/98 MIRU Dowell CT unit #2 and RIH with BHA #1. Latch fish on first attempt and pull to activate jars. Pulled off fish when jars went and could not latch again. Pull out of hole to check GS - no marks. Ordered Baker GS with spear nose like the Radius tool. Did not have spear with correct thread for Baker GS. Had piece machined. Rig up Baker GS on bottom of identical tool stdng (BHA #2) and RIH. Latch on immediately and begin jarring, pulling to 33,900#. After 20 successful jar licks the tubing came free. POOH with fish. Close slips on fish and pump to free tool stdng at the hydraulic disconnect. Rig off BOP's and secure well. Rig down tool stdng and plan on returning in the morning to connect back onto the fish with the GS and pull the fish. 1116 Dowell on location. Rig up to BOPs with BHA #3 and RIH. Latch fish and pull into lubricator. Rig off wellhead; cut and dress ends of coil to prepare for cold roll. POOH with fish - clean cut on end of fish. Cut fish into 20' pieces on back of unit and dispose of in metal dumpsters. 111719 8 RIH wl 3.65" decentralizer, 5.50" lib to 6433' wlm, couldn't get past, POOH w/no imp. RIH w/same to same, tded working past but couldn't, POOH w/imp of possible cement. RIH w/4.475" gauge ring to same, couldn't work past, POOH. RIH w/4.5" cent, 3" ddve down bailer to same, POOH w! inj. Mung w/cement chunks in bailer. RDMO 11/8/98 Miru DS Ctu #2. CTV=14500', CTV= 32.2 bbls. MU tools. RIH. Start UR at 6450', first obstruction at 6454'. UR suspected cement stringers from 8385' - 8416'. UR fill from 8802' - 8808'. Stop pumping, dry tag at 8939'. Decide to UR to fish depth. UR from 8938' - 8939', hard fill. Continue UR suspect aggregate from 8939' - 9017', softer fill. Began stalling motor at 9017'; suspect depth is the top of the CT fish. Reciprocate to clean hole. Drop 0.75" ball. Pump sweep. Pooh at 80% while circulating. F.P with MeOH to 2000'. CCH. Cement residue on coil at surface. LD tools. UR was worn, looked like it worked on hard fill or metal. Most likely occurred at 8939', dudng hardest U-reaming. 11/10/98 RIH w/3.625 t/s & 3.50 I.i.b. to 9,009',picture of cement. RIH w/2.25 ddve down bailer to 9,009',tap down, broke through, made Several passes, sat down @ 9,035'. RIH w/3.60 gauge dng, sat down @ 9,009',able to work through ,made Several passes ,sat down @ 9,030'. RIH w/3.625 t/s & 3.50 I.i.b. to 9,032',picture of cement. RIH w/2.50 I.i.b. to 9,035'>9,037',picture of cement, possible coil tubing Marks on edge of I.i.b. 11/15/98 RIH w/5.5" lib to 9004' wlm POH w/impression of top of fish RIH w/overshot w/ 5.75" bellguide 9010' wlm poh w/o fish RIH w/5.5" lib to 9004' wlm poh w/same impression RDFN 11/16/98 RIH w/overshot w/4.0" bellguide to 9010' wlm POH w/o fish ( went past top Of fish ) RIH w/o.s, w/5.75" bellguide to 9010' wlm POH w/o fish ( top of fish has Changed position ) RIH w/same to same poh w/o fish ( not sure if we're getting all the up To the grapples of o.s. RIH w/5.5' lib to same POH w/same impression RIH w/o.s. & 5.75" to same POH w/o fish ( getting coil up to grapples on O.s. but unable to get in grapple ) RDFN 11/17~98 RIH w/3.625" roller dog style overshot to 9010' wlm POH w/o fish RIH w/same to same POH w/150' of c/t fish RIH w/4.15" lib to 9035' wlm POH w/impression of possible cement RIH w/3" ddve down bailer to same POH w/full bailer ( chunks of cmt. Aggreget, & shmoo ) 11/28/98 MIRU, RIH w/3.625" decent., 3.70" lib to coil fish @ 9147' wlm, POOH w/imp. Of coil @ 1 o'clock. RIH w/3.625" decentralizer, kick up tool, 41/~ gr, bait sub w/clock spline w/shod roller dog w/spear inside to same, couldn't latch, POOH · RIH w/same, w/out clock and also w/long roller dog w/out spear, roller dog has 4.50" o.d. bellguide on bottom, attempt to latch coil w/no success. POOH. RIH w/same, w/spline clock to same, latch coil tubing fish and POOH w/18.5' of coil and Schlumberger 1.25" o.d. chemical cutter. RIH w/4.50" lib to coil fish @ 9162' wlm, POOH w/imp of coil. RIH w/3.625" decent., Kick up tool, 4 ~ gr, bait sub w/clock spline w/ bowen grapple overshot to same, latch last piece of coil tubing fish, hit approx. 10 oil jar licks @ 1000 lbs to 1800 lbs, moved fish up hole approx. 6', sheared gr, POOH. RIH w/41/~ gs to same, beat on for 20 min., Moved up hole 1', total of 7', sheared off, POOH. 11/29/98 MIRU, RIH w/17' 2 5/8" stem, 4 ~ gs to coil fish @ 9156' wlm, beat on for 20 min., Oil jars not working good, sheared off, POOH. RIH w! same, w/2 1/8 oiljars, 2 1/8 spangs w/same, to same, beat on for 20 min., No change, sheared off, POOH. RU braided line, RIH w/same, w/new 41/~ gs to 9159' wire, hit 3 licks, gs sheared, POOH. RIH w/same, w/different gs to same, beat on for approx. 1 ~/~ hrs., Looks like possibly pulled coil up hole 7', POOH to check tools. RIH w/same, to same, beat on for approx. 1 hr., Sheared off, POOH. LDFN 12/9/98 RIH with 4" O.D. side wall hook, hydraulic centralizer, and ratchet tool. Tagged top of fish @ 9,430 ft. CTM. Able to push fish to 9,494 ft. CTM. Stacked 3,000# on fish, increased pump rate to 1.25 bpm to rotate hook. Rotated a total of 12 tums to get a full 360 degree with hook. Worked pipe. Pull up hole slowly through jewelry. POOH. At surface. Recovered fish ( With Exception of coil tubing connector which was probably milled off ). Extension above nozzle was milled from the top to approximately 2/3 of the total length. A sliver of the milled stinger was hung in the grapple. Possibly have some metal left in hole. SDFN. STATE OF ALASKA ALA,~. . OILAND GAS CONSERVATION COl~, .SSION APPLICATION FOR SUNDRY APPROVAL Plug back for CT sidetra~_ 1. Type of Request:~ Abandon [] Suspend [] Plugging [] Time Extension [] Perforate Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Explora. tion (Alaska) Inc. 3. Address P.O. Box196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 10688 feet Plugs (measured) 9537 feet 10535 feet Junk (measured) 9396 feet Type of well: _ Development [] Service Exploratory Stratigraphic o Perforation depth: measured true vertical Datum Elevation (DF or KB) KBD = 55.09 AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number R-06i 9. Permit Number 79-52 10. APl Number 50-029-20388 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool fill at 10535' MD (11/89) Length Size Cemented MD TVD 110 20x30 605 c.f. 144 144 2627 13-3/8" 3863 c.f. 2661 2661 9706 9-5/8" 1514 c.f. 9740 8671 1454 7" 336 c.f. 9227-10681 8225-9530 ORI61NAL 9861'- 9935' Sqzd: 10076-85,10105-29 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) Plug with P kr @ 10072' subsea 8723'-8790' (Sag R.) 8849'-8973' (four Ivishak intervals) Tubing (size, grade, and measured depth) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083'; 7" SSSV landing nipple at 2017' 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation 6/29/98 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water Injection Date approved 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Ted Stagg 564-4694 Prepared By Name/Number: Theresa Mills 564-5894 17.1 hereby certify that the fore/go'~nd Signed Ted Staqq ~//~c~ correct to the best of my knowledge Title Coiled Tubing Drilling Engineer Commission Use Only Date Conditions of Approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~" Location clearance__ I Approval No. ,~'~_ [,~_~ Mechanical Integrity Test Subsequent form require~ 10- ,,,~ o'keefe6 . . Approved by order of the Commission .~r~,iGINAL SIGNED BY ~,gv e_,,~., ~ ,,,,Commissioner Form 10-403 Rev. 06/15/88 Robert N. Ct~ristenson .?'~i ..~....~- Date ~ -.~ i -" ~' ~ Submit In Triplicate BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: June 10, 1998 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Blair Wondzell Sr. Reservoir Engineer Re: Well R-06i Prep for CT Sidetrack Well R-06i is scheduled for a through tubing sidetrack to be drilled with coiled tubing. The following summarizes the procedure required to prepare R-06i for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of this proposed completion is attached. 1. Inner annulus was successfully pressure tested on 4/14/98. 2. Kinley caliper was run on 4141198. 3. RU E-line and set top of whipstock at 9920' MD. 4. RU service coil and abandon existing perforations with approx. 20 bbls. of cement by downsqueezing cement past the whipstock. (Note: The whipstock will be set just below existing Sag R. perforations. These Sag R. perfs will be squeezed and pressure tested as part of this procedure. When the sidetrack is completed, the 3 1/2" liner will be cemented to approx. 180 ft above the window thereby covering the Sag R. perfs with the cemented liner lap also.) 5. Pressure test abandonment cement to 1500 psi with AOGCC witness. 6. The window will be milled with the drilling coil. Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center TREE: 6" McEvoy WELLHEAD: McEvoy ACTUATOR: Otis R-,,6ai Proposed Comple,,on KB. ELEV = 55.09' BF. ELEV = 21.31' 13-3/8",72#/ft, L-80, BTRS 13 3/8" Sh°e I 2661 I FOC- al,,..._ SSSV LANDING NIPPLE I ( Otis )( 5.96" ID) I 2017 7",26~/ft, L-80, TUBING TUBING ID: 6.276" CAPACITY: .0382 BBL/FT PERFORATION SUMMARY REF: LOG: BHCS 9-27-79 SIZE I SPF I INTERVAL C~,PEN/SQZ'D ~"14I~6~-9~3~ OpeN 3~I ~ I9~s~-9905 OPEN S-9S ~-3~S"I ~ I ~-~"1" I 3_3~S,,I 4 I 3-3/8"1 4 I 10000-10028 10038-10066 10085-10105 10129-10136 OPEN/11-89 OPEN/11-89 OPEN/Il-89 OPEN/11-89 Top 7" Liner Hanger I 9227 9 5/8" 47# L-80 BTRS shoe 9740 MARKER JOINT I 9933' Top Whipstock approx. 9920' MD Abandonment cement to be downsqueezed past whipstock 7" Otis WD PACKER 4" MIN ID 4 1/2" "X" NIPPLE (Otis) (3.813" ID) 4/12 .... XN" NIPPLE (Otis) (3.725" ID) 4/12" WLEG (Otis) (4"ID) 10072 7"x5 1/2" CROSSOVER SLIDING SLEEVE Otis XA ( 4.562" MIN. ID) 9085 9098 9134 9187 9209 9221 9-5~8" PACKER ( TIW )(4.75"1 D) 5 1/2 .... X" NIPPLE (Parker) (4.562 X" ID) 5 1/2 .... XN" NIPPLE (Parker)(4.55" ID) 5 1/2" Seal Assembly / No Seal Could not get back down I 9210' ELMD in the liner top with the I Seal Assembly 4 1/2" open hole 3 1/2" cemented liner PBTD (Junk) 7" ,29#/ft, L-80, BTRS I10630 I1°681 ALA~._~. OIL AND GAS CONSERVATION COMMISSI~ REPORT 7 SUNDRYWELL OP[ ATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing Alter casing Repair well Other x 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612. Anchoraae, Alaska 99519-6612 4. Location of well at surface 729' NSL. 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1864' SNL, 1224' WEL, SEC. 32, T12N. R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32. T12N, R13E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBD = 55.09 AMSL 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number R-06i(32-32-12-13) PBU 9. Permit number/approval number 79-52 / 10. APl number 50.029-20388 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10688 feet BKB 9537 feet 10535 feet BKB 9396 feet Plugs (measured) Junk (measured) fill at 10535' MD (11/89) Casing Length Size Cemented Structural -- Conductor 110 20X30 605 c.f. Surface 2627 13 3/8 3863 c.f. Intermediate 9706 9 5/8 1514 c.f. Production -- Liner 1454 7 336 c.f. Perforation depth: measured 9861'- 9935' (Sag R.) 10fl7fi-RFi. l fl 1 ~3R-P.q - true vertical~ubsea 8723'-8790' (Sag R.) 8849'-8973' (four Ivishak intervals) Measured depth True vertical depth BKB 144 144 2661 2661 9740 8671 9227-10681 8225-9530 Tubing (size, grade, and measured depth) 7' L-80 to 9085' 5 1/2" L-80 9085' to top of 7' liner at 9227' Sqzd: Packers and SSSV (type and measured depth)9 5/8' TIW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083'; 7" SSSV landino nioole at2017' l'3 ~' r ~ , · 13. Stimulation or cement squeeze summar~ee Attachment ~ ~, L ~ ! V 14. Intervals treated (measured) Treatment description including volumes used and final pressure ORIGINA Representative Daily Average Production or Injection Data JAN 20 ]998 Prior to well operation Subsequent to operation OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 13000 15000 Tubing Pressure 30O 1000 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Oper~i~ons Oil Gas Suspended 17. I her~,~y,cdertify thj~t the ~r~going is trj,!,e ~d correct to the best of my knowledge. Si Title TechnicalAssistantlll Service water ~n_i, ection weI1 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE ._ R~6 DESCRIPTION OF WORK COMPLETED Stimulation Operation 11/02/97 A_HCL Bullhead StimulationTreatment was performed using the following fluids: SUMMARY Load 2968 gal. APG Dispersent Wash BB-1 at ARCO Chemical Pad. Mix with 353 bbls of 140°-fresh water from the ARCO fresh water plant.' Arrive on location and rig up Dowell Stimulation Pump Van. Pressure test hard lines to 4,000 psi. Pump 15 bbls methanol followed by 428 bbls caustic surfactant tubing wash. Pump 15 bbls methanol to freeze protect lines and well head. Shut down for a 3 hour soak period. Pump 177 bbls of produced water to displace surfactant out of the tubing. Freeze protect with 25 bbls methanol. Put well back on MI injection. ~BBLS. 428 53 177 653 · _. . Fluids Pumped _. Methanol Produced Water. TOTAL Description Caustic surfactant STATE OF ALASKA ^L~SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate__ Plugging__ Perforate Pull tubing__ Alter casing __ Repair well Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service X 4. Location of well at surface 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM ORIGINAL 6. Datum elevation (DF or KB) KBD = 55.09 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-06i(32-32-12-13) PBU 9. Permit number/approval number 79-52 / 10. APl number 50- 029-20388 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective.depth: measured true vertical 10688 feet Plugs (measured) BKB 9537 feet 10535 feet Junk (measured) BKB 9396 feet fill at 10535' MD (11/89) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length .. 110 2627 9706 .. 1454 Size Cemented Measured depth True vertical depth BKB 20X30 605 c.f. 144 144 13 3/8 3863 c.f. 2661 2661 9 5/8 1514 c.f. 9740 8671 7 336 c.f. 9227-10681 8225-9530 9861'- 9935' (Sag R.) Sqzd: 10076-85,10105-29 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) Plug with Pkr @ 10072' measured true vertical subsea 8723'-8790' (Sag R.) 8849'-8973' (four lvishak intervals) Tubing (size, grade, and measured depth) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227' Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083'; 7" SSSV landing nipple at 2017' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 13000 15000 Tubing Pressure 3OO 1000 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operati,~s __ 17. I hereb~ certify that the fore~e~nc~ is true and ~ire~ to the best of my knowledge. Sign'd-' : Title Tech./ca/Ass/stant/// Form 10-404 R~v 06/15/8~ 16. Status of well classification as: Oil __ Gas Suspended Service water injection well Date SUBMIT IN DU'PLICATE WELL R-06(32-32-12-13) 6/06/95 Reperf The following interval were reperforated using 3 guns, 6 SPF, random orientation and 60° phasing. 9861' - 9906' MD 3/8" LAP~RY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 10 June 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL 7 - 5 7 ~ -- / / C-05 (41-25-11-13) (44-31-11-14) (41-27-11-13) ?<:~ - (0t~F-34 (44-35-12-13) DESCRIPTION PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF GR/CCL FINAL BL+RF PLS FINAL BL+RF PLS FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 1680.04 5809.07 5830.02 6054.04 6181.05 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign snd~e~n%~$ PetrotechniealData Cente~ BP Exploration (Alaska) Ina J st Benson Boulevard a 99508 ed b x RE E[V D - dUN 1 6 1995 Oil & Sas Cons. Comm~ .~JO_r~ Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate X Plugging Pull tubing __ Alter casing Repair well m Perforate__ Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBD = 55.09 AMSL 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-06i(32-32-12-13) PBU 9. Permit number/approval number 79-52 / 10. APl number 50- 029-20388 11. Field/Pool Prudhoe Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10688 feet Plugs (measured) BKB 9537 feet 10535 feet Junk (measured) BKB 9396 feet fill at 10535' MD (11/89) Casing Structural Conductor Surface Intermediate Production ' Liner Perforation depth: Length .. 110 2627 9706 __ 1454 Size Cemented Measured depth True vertical depth BKB 20X30 605 c.f. 144 144 13 3/8 3863 c.f. 2661 2661 9 5/8 1514 c.f. 9740 8671 7 336 c.f. 9227-10681 8225-9530 9861'- 9935' (Sag R.) Sqzd: 10076-85,10105-29 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136'(Ivishak) Plug with Pkr@10072' measured true vertical subsea 8723'-8790' (Sag R.) 8849'-8973' (four Ivishak intervals) Tubing (size, grade, and measured depth) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227' Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083'; 7" SSSV landing nipple at 2017' 13. Stimulation or cement squeeze summary See Attachment 14. Intervals treated (measured) Treatment description including volumes used and final pressure Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl RECEIVED JUN -7 1995 .... A~ch0r~ ~, Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 13000 15000 300 1000 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations ~-, 16. Status of well classification as: Oil __ Gas Suspended Se rvice water injection well 17. I hereby c, ertify that the foregoing ~~rrect to the best of my knowledge. Signed .... ~ ,,v.,4,~,u~a~,~., ~.. Title SeniorTechnica/Assistantll Form 10-40~*R'ev 06/15/88 ~ D a t e SUBMIT IN EfUPL~iCATE 05/11/94 WELL R-06i(32-32-12-13) Stimulation Operation A HCL Acid Wash Treatment was performed using the following fluids: SUMMARY 1. BULLHEADED 262 BBLS 15 PERCENT HCL WITH 10 PER CENT. 2. DISPLACED WITH 450 BBLS OF FILTERED SEAWATER AT 120 DEGREES. (62 BBLS OVER DISPLACED). 3. TURNED OVER TO INJECTION. (INJECTION INCREASED FROM 7M TO 14M BWPD.) BBLS. 262 450 712 FLUIDS PUMPED DESCRIPTION 15 PERCENT HCL WITH 10 PERCENT BY VOLUME XYLENE. FILTERED SEAWATER AT 120 DEG F. RECEIVED STATE OF ALASKA /~"'"SF'''-~ ' AND GAS CONSERVATION COMMI"'-"ON ~i r., REPOR1 O :.SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing __ Alter casing Repair well Perforate X Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2468' SNL, 2875' WEL, SEC. 02, T11N, R13E, UPM At top of productive interval 1052' NSL, 435' WEL, SEC. 03, T11N, R 13E, UPM At effective depth 1033'NSL, 610' WEL, SEC. 03, T11N, R13E, UPM At total depth 1030'NSL, 646' WEL, SEC. 03, T11N, R13E, UPM 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 66. 77 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number F-09 (44-03-11-13) PBU 9. Permit number/approval number 79-76 / 10. APl number 50- 029-20403 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length - Structural -- Conductor 110 Surface 2671 Intermediate 9361 Production -- Liner : 10263 Perforation depth: 10300 feet BKB 9287 feet 10165 feet BKB 9157 feet Plugs (measured) Junk (measured) fill at 10165'MD (10/89) Size Cemented Measured depth True vertical depth BKB 20 x 30 7. 9 c.y. 139 139 13 3/8 4269 c.f. 2700 2699 9 5/8 1360 c.f. 9390 8418 7 490 sx measured 10006'-10050', 10060'-10070' 10292 9279 Sqzd: 9904'-9924', 9934'-9952', 9963'-9996' true vertical subsea 8954'-9015' (two intervals) Tubing (size, grade, and measured depth) 3 1/2" L-80 to 8785' with 2 7/8" tailpipe to 8921' Packers and SSSV (type and measured depth) 7" BOT 3H packer at 8813'; 3 1/2" SSSV at 1980' n cr'cl\lFl') 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure MAY - 9 1995 A~ska 0il & Gas Cons. Commission Anchora ~ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1595 19207 60 0 1641 19947 58 0 Tubing Pressure 496 998 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I he reby c~rtify th at the for g'o'lng is.~tr~e.j/and co_.rrect to the best of my knowledge. Si~ned~~J4~ ~_,e!/,...// ~-'1~-' Title SeniorTechnicalAssistantll Form 10-404J Rev 06/15/88 Service SUBMIT IN DU~Lr'CATE WELL F-09(44-03-11-13) Addoerf 10/28/94 The following additional interval were perforated using 2" guns, 4 SPF, 180° orientation and 0° phasing. 9985'- 9995'MD LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 19 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 PLS FINAL BL+RF 1CCL FINAL BL+RF 1 PLS FINAL BL+RF 1 GR/CCL FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run # 1 1680.03 Run # 1 4608.05 Run # 1 6300.04 Run # 1 Run # 1 6407.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please s~] and return to;. Pet~otechnlcal Data Centop RECEIVED 900 East Benson Boulevard ae~[~e ~d~~~ Oil & Gas Cons. Commission Ancl~orage STATE OF ALASKA ALAS'-"~OIL AND GAS CONSERVATION COMMISSI("-- REPORT b,-: SUNDRY WELL OPEnATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing __ Alter casing __ Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service × 4. Location of well at surface 729' NSL, 1400' El/FL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848'SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM ORiGiNAL 6. Datum elevation (DF or KB) KBD = 55.09 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-06i(32-32-12-13) PBU 9. Permit number/approval number 79-52 / 10. APl number 50- 029-20388 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10688 feet BKB 9537 feet Plugs (measured) 10535 feet Junk (measured) BKB 9396 feet fill at 10535' MD (11/89) Casing Length Structural -- Conductor 110 Surface 2627 Intermediate 9706 Production -- Liner 1454 Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Size Cemented Measured depth True vertical depth BKB 20X30 605 c.f. 144 144 13 3/8 3863 c.f. 2661 2661 9 5/8 1514 c.f. 9740 8671 7 336 c.f. 9227-10681 8225-9530 9861'- 9935' (Sag R.) Sqzd: 10076-85,10105-29 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) Plug with Pkr @100 72' subsea 8723'-8790' (Sag R.) 8849'-8973' (four ivishak intervals) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 9134'; 7" Otis WD packer at 10072' w/'l'P assy. to 10083'; 7" SSS V landing nipple at 2017' 13. Stimulation or cement squeeze summary See Attachment R E C ~ iV E D 14. Intervals treated (measured) JUN 2'1 1994 Treatment description including volumes used and final pressure ~i~,ska 0ii & Gas Cons. Commission Representative Daily Average Production or Injection Data ArmhDra~ Prior to well operation Subsequent to operation OiI-Bbl Gas;M~ Water-Bbl Casing Pressure Tubing Pressure .... 1152 -- 1834 .... 14988 ~ -- 1874 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service water in_iection weft 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,n~,~~, & "~~~ Title Senior TechnicalAssistantl Form 10-404[ Rev 06/15/88 ! SUBMIT IN Dt~PLIdATE 03~9~3 WELL R-06i(32-32-12-13) Stimulation Operation A HCL Acid Wash Treatment was performed using the following fluids: SUMMARY RIH WITH 3.25" JETTLNG NOZZLE AND SET DOWN IN TAILPIPE AT 10090' CTD. JETTED THRU FIRM RESTRICTION AND RIH TO 10430 FT CTD WHILE JETTING. CIRC OUT MUNG AND LET WELL FLOW, WHILE BJS RIGGED UP. PUMPED 12 BBL DIESEL AND LET SOAK, PUMPED 53 BBL 15%HCL/15%XYLENE AND LET SOAK, PUMPED 57 BBL 15%HCL/15%XYLENE AND LET SOAK. RECIP CT ACROSS PERFS DURING EACH STAGE. EACH STAGE PRODUCED BETYER INJECTMTY (DECLINING WHP). VERY GOOD RESPONSE TO ACID TREATMENT. POOH AND R/D CTU. PUT WELL ON INJECTION AT 0200 HRS. INJECTING AT 16000 BPD AT 1000 HRS. FLUIDS PUMPED BBLS. DESCRIPTION 269 SEAWATER 12 DIESEL 110 15 % HCL / 15 % XYLENE ACID 26 MEOH fjh 6/20/94 RECEIVED JUN 2 1 199 Anchorace RECEIVED Alaska 011 & Gas Cons. Commission Anchorage ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 28 April 1994 Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ~~ R-35 (23-33-12-13) 1 PLS PROFILE FINAL BL /1 PLS GASLFT FINAL BL 1 PLS PROFILE RF SEPIA //1 PLS GASLFT RF SEPIA ~,-%'l,~ R-32 (22-33-12-13) /1PLS INJPROF.FINAL BL 1PLS INJPROF.RF SEPIA 3 q_5% R-06 1 PLS FINAL BL /1 PLS FINAL RF SEPIA ~b~. F-14 (33-35-12-13) PLS FINAL BL 1 PLS FINAL RF SEPIA ~ PLS FINAL BL 1 PLS FINAL RF SEPIA ~0.~7~ F-14 (33-35-12-13) . ~.. . ... 1 PLS FINAL BL 1 PFC/PERF RF SEPIA ~L-t~O H-17 (34-15-11-13) /1 DIFF.TEMP. FINAL BL 1 DIFF.TEMP. RF SEPIA Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run ~ 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run ~ 1 Run. # Ii ' Run ~ 1 Run # 1 Run # 1 ECC No. 6136.03 6106.05 1680.02 959.06 3560.01 959.05 5665.05 STATE OF ALASKA A. ~,KA OIL AND GAS CONSERVATION COMMIL JN REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging__ Perforate__ Pull tubing Alter casing Repair well 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A- water injection well At effective depth 1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service Other 6. Datum elevation (DF or KB) ~.l KBD = 55.09 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-06i(32-32-12-13) PBU 9. Permit number/approval number 79-52 / 10. APl number 50- 029-20388 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured 10688 feet true vertical BKB 9537 feet Effective depth: measured 10535 feet true vertical BKB 9396 feet Casing Length Size Structural -- Conductor 110 20X30 Surface 2627 13 3/8 Intermediate 9706 9 5/8 Production -- Liner 1454 7 Plugs (measured) Junk (measured) fill at 10535' MD (11/89) Cemented Measured depth True vertical depth BKB 605 c.f 144 144 3863 c.f. 2661 2661 1514 c.f. 9740 8671 336 c.f. 9227-10681 8225-9530 Perforation depth: measured 9861'- 9935' (Sag R.) Sqzd: 10076-85,10105-29 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) Plug with Pkr@10072' true vertical subsea 8723'-8790' (Sag R.) 8849'-8973' (four Ivishak intervals) Tubing (size, grade, and measured depth) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227' Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083'; 7" SSSV landing nipple at 2017' 13. Stimulation or cement squeeze summary 14. SeeAttachment RECEIVED Intervals treated (measured) Treatment description including volumes used and final pressure S EP 1 Representative Daily Average Production or ~niectl'Oh"D'Affi' ~. -"'¥". .... Oil-Bbl Gas-Mcr Water-Bbl -Casing 'Pres~;ilOr gl~'ubing Pressure Prior to well operation Subsequent to operation 0 '- 0 10410 -- 1844 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service water in_iection well 17. I hereby ce~ify that the foregoin~.g'lrue and correct to the best of my knowledge. Si,ned ~--./~/~ :/ ..~4:9~.' Title SeniorTechnicalAssistantl Form 10-4~"~'R~v 06/15/88 ~' Date ~',//,~'//.,,,7 SUBMIT IN D'[JP~'ICATE 1/08/92 1/10/92 2/12/92 WELL R-06i(32-32-12-13) AGID Stimulation Operation Performed a HCL Perf Wash using the following fluids below: FLUIDS. PUMPED: 72 BBLS 15% HCL/iO% Xylene 500 BBLS Slick Produced Water 43 BBLS Methanol Performed a Bullhead Peroxide using the following fluids below: FLUIDS PUMPED: 86 BBLS 70% DIESEL/20% Xylene/10% MIBK 142 BBLS Solvent Wash 868 BBLS Base Water(Filtered Produced Water) 143 BBLS 7.5% HCL 119 BBLS CLAY-FIX(NH4CL) Flush Water 637 BBLS 2% Hydrogen Peroxide 179 BBLS Half Strength Mud Acid (6% HCL/1.5% HF) 71 BBLS 3% HCL 75 BBLS METHANOL Performed a Bullhead Peroxide using the following fluids below: FLUIDS PUMPED: 284 BBLS 7.7% HCL AND ADDITIVES 285 BBLS 2.0% NH4CL and Additives mixed with PW 317 BBLS PW fjh 5/20/93 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 12/04/92 T#:84145 FROM: Information Control Well Records MB3-3 SUBJECT: BP CASED HOLE LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ?W.t-Z. G-24 ?z- ~ R-061 R-30 ~0~-~,~ H-28 ,~'~'-' ~'~ R-01 co ~-- ~ X-241 GAS ENTRY SURVY 09-OCT-92 #1 10150-10315 CAMCO INJECTION PROF 17-OCT-92 #1 9800-10200 CAMCO PROD PROF SURVY 15-OCT-92 #1 11100-11580 CAMCO LEAK DET LOG 07-OCT-92 #1 SURF-11700 CAMCO GAS LIF'i'SURVY . 07-OCT-92 #I ' 2500-9174 CAMCO INJECT PROF LOG 12-OCT-92 #1 9050-9456 CAMCO 5" 5" 5" 5" CEIVED DEC 1 8 1992 Alaska 0ii & Gas Cons. Commission Anchorage Distribution: ARCO CHEVRON EXXON MOBIL PHILLIPS STATE OF ALASKA ARCHIVES A.FRANKENBURG STATE OF ALASKA .~--_. , ":KA O,L AND GAS CONSERVAT,ON COMM ~N 0 ~ REPOR OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate × Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection weft At effective depth 1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service X 6. Datum elevation (DF or KB) KBD = 55.09 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-06i(32-32-12-13) PBU 9. Permit numbedapproval number 79-52/ 10. APl number 50- 029-20388 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length .. 110 2627 9706 measured true vertical 10688feet BKB 9537feet 10535feet BKB 9396feet Plugs (measured) Junk (measured) fill at 10535' MD (11/89) Size Cemented 20X30 605 c.f. 13 3/8 3863 c.f. 9 5/8 1514 c.f. .. 1454 7 336 c.f. 9861'- 9935' (Sag R.) Tubing (size, grade, and measured depth) Measured depth True vertical depth BKB 144 144 2661 2661 9740 8671 9227-10681 8225-9530 Sqzd: 10076-85,10105-29 10000;10028', 10038;10066', 10085;10105', 10129;10136'(Ivishak) Plug with Pkr@10072' subsea 8723;8790' (Sag R.) 8849'-8973' (four ivishak intervals) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227' Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 9134'; 7" Otis WD packer at 1~,072' w/TP assy. to 10083'; 7" SSSV landing nipple at 2017' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and fin~il pressure Prior to well operation Subsequent to operation Representative Daily Average Production ¢.r. lnjection Dal~ OiI-Bbl Gas-Mcf Water-Bbl Casing Pressu,'~ .... 2500 -- .... 7000 -- Tubing Pressure 1920 1950 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service water in_iection well 17. I hereby cert. jfy that the~ foregoingj~'tve an~_~rect to the best of my knowledge. signed ~,, ~..~~ (7/'?,~,;~.~ Title SeniorTechnicalAssistantl :orm 10-404~ev' 0~/15/88 "2/ SUBMITIN DUISLIC~TE r~ 12/12-13/91 12/14-15/91 WELL R-06i(32-32-12-13) HCL A HCL/HF Treatment was performed using the following fluids' 51 bbls 70% Diesel/20% Xylene/10% MIBK 43 bbls Solvent Wash(PW, 25% Xylene, 2% Surfactant, 10% Musol) 22 bbls 15% HCL 24 bbls 12.5% Sodium Hypochlorite/5% Sodium Hydroxide 72 bbls Half Strength Mud Acid(6% HCL/1.5% HF) 24 bbls 3% HCL 24 bbls Flush Water(PW, 2% Ammonium Chloride, 1% Surfactant) 133 bbls Filtered PW 55 bbls Methanol Stimulation #1 A HCL/HF Treatment was performed using the following fluids: 51 bbls 70% Diesel/20% Xylene/10% MIBK 43 bbls Solvent Wash(PW,25% Xylene, 2%Surfactant, 10% MUSOL 22 bbls 15% HCL 24 bbls 12.5% Sodium Hypochlorite/5% Sodium Hydroxide 72 bbls Half Strength Mud Acid(6% HCL/1.5% HF) 24 bbls 3% HCL 24 bbls Flush Water(PW,2% Ammonium Chloride, 1% Surfactant) 171 bbls Filtered PW 75 bbls Methanol _::: . '.-'" Stimulation #2 9/24/92 fjh RECE V O Alaska 0il & Gas Cons. BP EXPLORATION BP Exploralion (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 08/12/92 T# 83797 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 07/19/92 #1 07/25/92 ~1 07/22/92 #! 07/27/92 #! 07/21/92 31 07/25/92 #! 07/27/92 ~! 07/19/92 ~! 07/18/92 ~1 07/18/92 ~i 07/24/92 ~1 07/20/92 ~! 9480 00- 9815.00 CAMCO 5 " 2300 00-12756 00 CAMCO 2/5" 11150 00-11390 00 CAMCO 5 " 9800 00-10068 O0 CAMCO 5 " 10900 00-11110 00 CAMCO 5 " 2300 00- 9290 00 CAMCO 2/5" 11250 00-11898 00 C~CO 5 " 8600.00- 9744 00 C~CO 5 " 9100.00- 9420 00 CAMCO 5 " 10800.00-11177 00 CAMCO 5 " 9680.00-10005 00 CAMCO 5 " 11900.00-12720 00 CAMCO 5 " Information Control Well Records Adrian J. Martin RECEiVED AU~ 2 5 1992 Alaska 0/I & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P,O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03/24/92 T# 83343 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. R-06 ~' ~'~ INJ R-12 ~' 3~-- COMPLETION F-48 ~/'"'.~ CCL/PERF Y-28 ~/--~- CL c-13 ~-~2 Psc W-10 ~-/~TUBING CUTTER x-0~ ~_~ ~s 5 " 03/18/92 #1 03/20/92 #1 03/19/92 #1 03/16/92 #1 03/12/92 #1 03/11/92 #1 . 03/13/92 #1 03/11/92 9750.00-10074.00 SCH 5 " 10595.00-10936.00 $CH 5 " 12000.00-12584.00 ATLAS 5 " 8806.00- 9408.00 ATLAS 5 " 10905.00-11297.00 ATLAS 5 " 13534.00-13710.00 ATLAS 5 " 11659.00-12532.00 ATLAS 5 " 11100.00-12116.00 ATLAS Information Control Well Records Adrian J. Martin RECEIVED MAR 3 1 1992 Alaska 0ti & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P,O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 DATE: 01/28/92 T# 83212 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. JlN-19N-19 ~]-36 PERFCCL/PERF JS-08~Z~ PERF g~,~- 07 LEAK DET 01/05/92 ~1 01/11/92 #1 01/15/92 #1 01/02/92 #1 12/31/92 #1 01/14/92 #1 01/18/92 %1 9792.00-10683.00 HLS 9840.00-11790.00 HLS 9750.00-10082.00 HLS 9156.00- 9770.00 HLS 9100.00- 9750.00 HLS 9001.00--9205.00 HLS 1740.00-10602.00 HLS ~ Information Control Well Records Adrian J. Martin RECEIVED FEB 1 2 199Z Alaska 0ii & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 /' :/ DATE: 01/03/92 T# 83152 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 2000.00-11539.00 CAMCO 2/5" ~ ~_,_~~.~K/ ~s ~-/o~/~ #~ 9~5o.oo- 9~o.oo c~co 5 " ~t-I~ PROD-F 12/07/91 #1 9150.00- 9520.00 CAMCO 5 " ~-~ B-13~// INJ 12/09/91 #1 10586.00-10935.00 CAMCO 5 " ~.~. ~--:%'F.~.~ ~Nj 12/04/91 #1 9800.00-1008O.00 CAMco 5 " ~-}~.D-08 ~/~ -- CCL 12/08/91 #1 8758.00-10259.00 CAMCO 5 " 80-JAqM---~ ~/ ~ INJ 12/06/91 #1 9350.00- 9850.00 CAMCO 5 " - ~ Y~J/ GAS LIFT SURVEY 12/07/91 #1 100.00- 9130.00 CAMCO 2 " ~1~.~ E~-13 >'.,/, CCL 12/09/91 #1 10500.00-10867.00 CAMCO 5 " ~.,~--CD'F~ ~.~ ~/0~/~ #~ ~-~50.00-~3~5.00 c~co 5 " ~1-1~, X-18 ~ PROD-F 11/08/91 #1 10000.00-11010.00 CAMCO 5 " ~-~6Z-32 ~// TEMP 11/05/91 #1 9900.00-11038.00 CAMCO 5 " ~,~ P-15 ,~/~ PROD-F 11/09/91 #1 12000.00-12337.00 CAMCO 5 " ~-~ N-21J_~ CA 11/06/91 #1 9750.00-11270.00 CAMCO 5 " ~%~ S-03~ TEMP 12/06/91 #1 11095.00-12076.00 CAMCO 5 " ~-~ W-16~ /, PROD-F 11/21/91 #1 5300.00-11200.00 CAMCO 5 " q%-~ Y-31~~; GAS LIFT SURVEY 11/24/91 #1 0.00- 2840.00 CAMCO 2/5" ~)-~Y-15~v// GAS LIFT SURVEY 11/24/91 #1 0.00- 9860.00 CAMCO 2 ,, ~,~D~ .~/ GAS ENTRY 12/08/91 #1 9950.00-10240.00 CAMCO 5 " ~'/O°Z-20~/~ GAS ENTRY 12/05/91 #1 11100.00-11450.00 CAMCO YY GAS5 " ~.?//- J-02 ENTRY 12/05/91 #1 9850.00-10200.00 CAMCO 5 " Information Control Well Records Adrian J. Martin RECEIVED JAN 0 8 1992 Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :07/15/91 T#:82584 FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the matedai listed below, if you have any questions, please contact BP Well Records at (907) 564-44'!.5. A~06 B-05 B-25 ~,..~ B-25 1~'F-26 G-26 M-09 M-09 4~/. M-09 /~-P-12 R-06 R-06 R-21 R-21 ,Y-32 Jewelry Log 05/24/91 #1 9300-9500 HLS 5" CL 05/06/91 #1 10489-10788 HLS 5" Jewelry Log 05/30/91 #1 9700-10113 HLS 5" Perf 05/30/91 #1 9700-10113 HLS 5" CL Baker Packer 06/28/91 #1 9900-10560 HLS 5" Peal 03/15/91 #1 10362-10580 HLS 5" Production Log 06/05/91 #1 9900-10289 HLS 5" Gas Lift Survey 06/05/91 #1 9900-10289 HLS 5" Production Log 06/05/91 #1 9900-1~0289 , HLS 5" Perf 06/06/91 #1 8930-9550 -HLS 5" Production Log 06/15/91 #1 9700-10080 HLS 5" Production Log 06/15/91 #1 9700-10080 HLS 5" Production Log 06/14/91 #1 10100-10380 HLS 5" Production Log 06/14/91 #1 10100-10380 HLS 5" Production Log 06/15/91 #1 12200-12760 HLS 5" Production Log 06/15/91 #1 12200-12760 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES STATE OF ALASKA :-~ AL ..,KA OIL AND GAS CONSERVATION COMMIS..,ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate 3( Plugging Pull tubing Alter casing 2, Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1864' SNL, 1224' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM Repair well 5. Type of Well: Development __ Exploratory Stratigraphic ~ Service X. - 6 199t Alaska .0il .& Gas Cons. Commis$[ot~ Anchorage.' 12. Present well condition summary Total depth: measured true vertical 10688feet BKB 9537feet Plugs (measured) Perforate Other 6. Datum elevation (DF or KB) KBD , 55.09 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-06 (32.32.12.13) PBU 9. Permit number/approval number 79-52/8-482 10. APl number 50- 029-20388 11. Field/Pool Prudhoe Oil Pool Effective depth: measured true vertical '~10535feet BKB 9396feet Junk (measured) fill at 10535' MD (11/89) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured Length 110 20X30 2627 13 3/8 9706 9 5/8 1454 7 9861'- 9935' (Sag R.) Size true vertical Tubing (size, grade, and measured depth) Cemented Measured depth True verticalde~h BKB 605~ 144 144 3863~ 2661 2661 1514 ~ 9740 8671 336 c.f. 9227-10681 8225-9530 Sqzd: 10076-85,10105-29 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136' (Ivishak) subsea 8723'-8790' (Sag R.) 8849'-8973' (four ivishak intervals) 7" L-80 to 9085' 5 1/2" L-80 9085' to top of 7" liner at 9227' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 9134'; 7" Otis WD packer at 10072' w/TP assy. to 10083'; 7" SSSV landing nipple at 2017' 13. Stimulation or cement squeeze summary 4/18/90 - 15% HCl perforation wash Intervals treated (measured) as above Treatment description including volumes used and final pressure 2000 gal. 15% HCI w/10% xylene 14. Reoresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations -- 11,900 -- 2000 -- 21,400 -. 2130 16. Status of wellclassification as: Oil Gas Suspended... Service water ~]ect~n 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,~ ~.c,~~ Title Supervisor Waterfiood/Miscible Flood Form 10-404 Rev 06/15/88 ~/ Date ~.!'-z.? I [~ SUBMIT IN DUPLICATE / BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 56%5111 TO: DISTRIBUTION Date :07/26/90 T#:81437 FROM: SUBJECT: Information Control Well Records LR2-1 BP (~ASED HOLE FINALS Enclosed is your copy of the matedai listed below, if you have any questions, please contact BP Well Records at (907) 564-ddd5. M-13 INJ 07/11/90 #1 9350-9980 Camco 5" M-28 INJ 07/13/90 #1 8650-8950 Camco 5" R-06 INJ 07/11/90 #1 9800-10070 Camco 5" R-07 INJ 07/11/90 #1 9680-9970 Camco 5" S-21 PROD-F 07/16/90 #1 9880-10350 Camco 5" X-24 FM 07/13/90 #1 9100-9490 Camco 5" Z-22 GR/CCL 07/16/90 #1 13500-14091 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR AR'ClOVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard Re. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 29, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well R-06i (32-32-12-13) PBU Enclosed, in duplicate, is form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of pulling tubing and perforating the well. Yours very truly, Workover/Completions Supervisor RVS/KTH Enclosures (2) cc: J. Martin (MB 9-4) Prudhoe Production Engineers B. Wilks (MB 5-3) Well Records w/9- Well File STATE OF ALASKA , 5KA OIL AND GAS CONSERVATION COMMI3oION REPORT OF SUNDRY WELL 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Puli tubing X Alter casing Repair well Other 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729' NSL, 1400'EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1894' SNL, 1375' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM 12. Present well condition summary Total depth: Effective depth: 5. Type of Well: Development Exploratory Stratigraphic Service X 6. Datum elevation (DF or KB) KBE = 55.09 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-06i (32-32-12-13) PBU 9. Permit number/approval number 79-52/9-812 10. APl number 50- 029-20388 11. Field/Pool Prudhoe Bay Field/Oil Pool measured true vertical measured true vertical 10688 feet Plugs (measured) BKB 9537 feet 10134 feet Junk (measured) BKB 9026 feet Fill at 10134' (06/88) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth .. BKB 110' 20" x 30" 605 cu ft 144 144 2627' 13-3/8" 3863 cu ft 2661' 2661' 9706' 9-5/8" 1514 cu ft 9740' 8671' Tubing (size, grade, and measured depth) .. 1454' 7" 336 cu ft 9227'- 10681' 8225'-9530' measured 9861'-9935', 10000'-10028', 10038'-10066', 10085'-10105', 10129'-10136'(open intervals) 10076'-10085', 10105'-10129' (Isqueezed intervals) true vertical (subsea) 8723'-8909', 8926'-8945', 8966'-8972' (five open intervals) 8918'-8926', 8966'-8973' (two squeezed intervals) 7" 26~ IJ4S to 9085 w/x-overto 5-1/2" L-80 w/4-1/2" tailpipe to 10084' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. 9-5/8" Packer@9137', 7" Otis WD Packer @ 10073', SSSV@ 2019_'_. APR - z, 1990 Alaska 0ii & 6as Cons. C,0m~tss~0~'~ An~hnr~_~e Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 18861 198 psig 12078 164 psig' 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Oil Gas Suspended Service Water In. iecton 17. I hereby certify that the foregoin, g, is,t~ue and co,,r, rect to the best of my knowledge. . Signed ~~.~ Title CompletionEngineerin~Supervisor Form 10-404 Rev 06/'1~/88 ----- SUBMIT IN DUPLICATE ATTACHMENT I R-06i WORKOVER PROCEDURE Outline Procedure' 1. MIRU workover rig. Accepted rig 1400 hrs. 10-27-87. 2. Pulled BPV. 3. Circulated diesel from well. 4. Installed 2-way check valve. 5. ND tree. NU & tested BOP's to 5000 psi. 6. Pulled 4-1/2" tubing. RIH to recover packer. Repaired pipe skate. 7. Set storm packer. Replaced the 9-5/8" packer. Recovered storm packer. RIH. 8. Milled and recovered the 9-5/8" BOT packer and tailpipe assembly. 9. RIH 6" bit. Tested 9-5/8" casing and 7" liner lap to 3000 psi - ok. 10. Cleaned out cement to 10,150'.- 1 1. Tested cement squeeze to 1000 psi -ok. 12. Clean out to 10630' PBTD. Circulated. POH. 13. RIH 9-5/8" casing scraper to 9217'. Reverse circulated. 14. RIH with 7" casing scraper to 10185'. Reverse circulated. 15. Changed over to clean brine. 16. RU shooting flange and perforated the well with 5" casing guns from 9861'-9935'. 17. RIH with 9-5/8" RTTS and frac well. POH 5" DP. 18. RIH with 6" bit and clean out bridge plug to 10597'. Reverse circulated. Changed over to clean brine. 19. Ran 8.5" and 6" gauge rings. 20. RIH with WD packer and set at 10070'. 21. RIH with 7" tubing with 5-1/2" tail pipe. 22. Set 2-way check valve. 23. ND BOP's. NU and test 6"-5M tree to 5000 psi. 24. Pull 2-way check valve. Set plug in the tailpipe. 25. Set 9-5/8" permanent packer. Tested tubing X casing annulus to 2500 psi. 26. Shifted sleeve open. 27. Displaced annulus to 130 bbls diesel & U-tubed diesel to tubing. Closed sleeve and tested for closure. Set BPV. Released rig @ 1600 hrs. 11-08-89. 28. 29. RECEIVED APR - 6 1990 Alaska Oil & Gas Cons. Comt~lssl.~ Anchorag~ Rig: DOYoN I6 WelI: R-6i (32-32-12_13) Current Operation: Daily Drilling Report October 30, 1989 at 0600 hfs APE # 160509 (Expense) AF~ Amount: AF~ # 125027 (Capital) AF~ Amount: "PBU .. Workover . Current Amount: 0600 Depth: 0 Day: 3 Repairing pipe skate. Accepted rig 1400 hrs. I0-27-89. Pull BPV. Circulate dieseI from well. ND tree. NU and test BOp to 5000 psi. PuII tubing. ~ to recover packer. Repair pipe skate. Wells Shut-in for DriLl-By: RECEIVED APR - 4 1990 .Oil & Gas Oona. ¢ommi~io[~ ;AnchOrage BP EXPLORN'iON Daily Drilling Report -- PBU -- Workover October 31, 1989 at 0600 hrs Rig: DOYON 16 Well: R-6i (32-32-12-13) AFE # 160509 (Expense) AFE # 125027 (Capital) APE Amount: AFE Amount: Current Amount: 0600 Depth: 0 Day: 4 Current Operation: Reverse out brine. Engaged fish; released latch. POH recovered seal assembly. Set storm packer and replace 9-5/8" primary and secondary packoff. NU and test spool and BOP. Recover storm packer. RIH. Wells Shut-In for Drill-By: BP EXPLORN'ION Daily Drilling Report-- PBU-- Workover November 1, 1989 at 0600 hrs Rig: DOYON 16 Well: R-6i (32-32-12-13) AFE # 160509 (Expense) AFE # 125027 (Capital) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 0 Day: 5 Current Operation: Mill and recovered 9-5/8" packer. Laid down 6-1/4" dr/il collars. ' Wells Shut-In for Drill-By: BP EX]~ORJqlON Daily Drilling Report-- PBU-- Workover November 2, 1989 at 0600 hrs Rig: DOYON 16 Well: R-6i (32-32-12-13) AFE # 160509 (Expense) AFE # 125027 (Capital) AFE Amount: Current Amount: 0600 Depth: 10630' Day: 6 Current Operation: POH. RIt-t 6" bit. Tested 9-5/8"casing and 7" liner lap to 3000 psi. - OK. Cleaned out to 10150'. Tested squeezed perforations to 1000 psi. - OK. Cleaned out to 10630' PBTD. Circulate. POH. Wells Shut-In for Drill-By: BP EXFI.0~JmON Daily Drilling Report -- PBU -- Workover November 3, 1989 at 0600 hrs Rig: DOYON 16 Well: R-fi (32-32-12-13) AFE # 160509 (Expense) AFE # 125027 (Capital) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10630' Day: 7 Current Operation: Change over to clean brine. Polish fie-back receptacle. Run 9-5/8" scraper to 7" liner top 9217'. Reverse circulate. Ran 6" bit and 7" scraper to 10185'. Change over to filtered brine. Wells Shut-In for Dr/il-By: BP EX]q. ORAJ'~N Daily Drilling Report -- PBU -- Workover November 6, 1989 at 0600 hrs Rig: DOYON 16 Well: R-6i (32-32-12-13) AFE # 160509 (Expense) AFE # 125027 (Capital) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10597' Day: 10 Current Operation: Reverse circulating. Perforated the well 9861' to 9935'. RIH 9-5/8" RT'rS to 9174'. Fmc well. POH 5" DP. RIH clean out sand and bridge plug to 10547'. Reverse circulate. Wells Shut-In for Drill-By: BP EXPLOR~N Daily Drilling Report -- PBU -- Workover November 7, 1989 at 0600 hrs Rig: DOYON 16 Well: R-6i (32-32-12-13) AFE# 160509 (Expense) AFE # 125027 (Capital) AFE Amount: AFE Amount: Cuxrent Amount: 0600 Depth: 12597' Day: 11 Current Operation: Running tubing. Change over to clean brine. Ran 8.5" and 6" gauge rings. Ran and set WD packer at 10070'. Running 7" robing. Wells Shut-In for Drill-By: BP EXFt. OR~N Daily Drilling Report -- PBU -- Workover November 8, 1989 at 0600 hrs Rig: DOYON 16 Well: R-6i (32-32-12-13) AFE # 160509 (Expense) AFE # 125027 (Capital) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12597' Day: 12 Current Operation: Set plug in tailpipe. Ran 7" robing. Install 2 way check. ND stack. NU and test tree to 5000 psi. - OK. Set plug in tailpipe. Wells Shut-In for Drill-By: Daily Drilling Report -- PBU -- Workover November 9, 1989 at 0600 hrs Rig: DOYON 16 Well: R-6i (32-32-12-13) AFE # 160509 (Expense) AFE # 125027 (Capital) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10597' Day: 13 Ctm'ent Operation: Rig released. Set packer. Open sliding sleeve and freeze protect with 130 bbl diesel. Close sliding sleeve. Set BPV. Release rig 1600 hrs. 11-08-89. Wells Shut-In for Drill-By: BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 12/19/89 Transmittal: 80705 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. C-27 Leak Det 11/30/89 #1 Surf-ill37 Camco J-12 FM/Temp 11/29/89 #1 9550-9950 Camco 5" ~-29 Inj 12/03/89 #1 9450-9900 Camco R-06i Inj 11/28/89 #1 9750-10527 Camco 5' S-13 Prod-F 12/02/89 #1 10750-11228 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 11/28/89 Transmittal: 80626 From: Subject: Information Control Well Records LR2-1 BP CASED HOLE FINAL LOGS -. Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. K-14 PROD-F 11/20/89 #1 9900-10250 Sch F-22 TDT-P 11/17/89 #1 9250-9854 Sch 5" F-22 TEMP & PRES 11/17/89 #1 9310-9834 Sch R-6i COMPLETION 11/18/89 91 9046-10501 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 11/10/89 Transmittal: 80584 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. R-6 CCL 11/06/89 ~1 9812-10066 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES I RECEIVED ~ov ~ z 1989 Alaska 0il & Gas Cons. Commissiof~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard I:~. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 11/07/89 Transmittal: 80569 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any . questions, please contact BP Well Records at (907) 564-4445. ~ B-15 ~ B-16 '~ F-17 ~ ~-06 ~ X-07 CNL - GR ~ 11/02/89 91 9644-9646 Atlas 5~ CNL - GR~' 11/01/89 91 9500-10315 Atlas 5" PFC 11/01/89 ~1 11008-11296 Atlas CCL 11/03/89 91 9750-10050 Atlas 5' CCL 11/04/89 8t -~-10730-11056 Atlas Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES RECEIVED NOV ! ~ Oil & ~ Co~ C.~i~ BP EXPLORATION 8F' E×ploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 September 6, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attention' Mr. C. V. Chatterton We!l,, R-06i (32-32-12-13) PBU Gentlemen' Enclosed, in triplicate, is form 10-403, Application for Sundry Approvals, for the above-named well. This information contains our proposal to pull tubing and perforate the well. Yours very truly, R. V. Schock Workover/Completions Supervisor RVS/KTH Enclosures CC: J. Martin (MB 9-4) Floyd Hernandez Well File STATE OF ALASKA AL~dKA OIL AND GAS CONSERVATION COMMISb,,.)N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well__ Plugging __ Time extension __ Stimulate __ Change approved program__ Pull tubing X Variance__ Perforate X Other__ 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1894' SNL, 1375' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM 5. Type of Well: Development __ Exploratory __ Stratigraphic__ Service X 6. Datum elevation (DF or KB) KBE = 55.09 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-06i (32-32-12-13) PBU 9. Permit number 79 -52 10. APl number 50- 029-20388 11. Field/Pool Prudhoe Bay Field/Oil Pool 12. Present well condition summary Total depth: measured true vertical 10688 feet BKB 9537 feet Plugs (measured) Effective depth: measured 10134 feet true vertical BKB 9026 feet Junk (measured) Fill at 10134' (06/88) Casing Length Size Structural -- Conductor 110' 20" x 30" Surface 2627' 13-3/8" Intermediate 9706' 9-5/8" Production -- Liner 1454' 7" Perforation depth: measured 9861'-9903'(Sag R.) Cemented Measured depth 144 2661' 9740' 605 cu ft 3863 cu fl 1514 cu fl 336 cu ft 9227'-10681' 10000~10028~ 10038~10066~ 10076L10136'dvbhak) true vertical (subsea) 8723'-8761'(Sag R.) 8849'-8972' (three lvishak intervals) Tubing (size, grade, and measured depth) 4-1/2"L-80 to 9180' with 3-1/2" tailpipe to 9293' Packers and SSSV (type and measured depth) 9-5/8" BOTpacker at 9180'; no SSSV True vertical depth BKB 144 2661' 8671' 8225'-953O' RECEIVED SEPI I Alaska Oil & 6as Cons, 0 tiss[0[. Anchorage 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation 3rd Quarter 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Service Water In/ecton Suspended .__ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~-~ ~ ¢--~ (.~-,,t"' Title Completion Engineering Supervisor FOR COMMISSION USE ONLY Date 7-'/-~"~' Conditions of approval: Notify Commission so representative may witness Plug i nteg rity BC~P ~'est Location clearance Mechanical Integrity Test~ Subseq.~at form required 10- ~ Approved by order of the Commission ORIGINAL SIGNED BY Form 10-403 Rev 06/15/88 L._./ LONNIE O. SMITH IAppr°val N°' Approvea Copy Returned Commissioner Date SUBMIT IN TRIPLICATE ATTACHMENT I R-06i WORKOVER PROCEDURE Procedure Outline: I , 2. 3. 4. 5. 6. 7. 8. , 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. Perform Pre rig workover CTU squeeze. MIRU workover rig. Pull BPV. Circulate diesel from well. Install 2-way check valve. ND tree. NU & test BOP's to 5000 psi. Pull 4-1/2" tubing. Install storm packer. Replace and test the 9-5/8" pack- off. Recover storm packer. Recover PBR. Mill and recover the 9-5/8" BOT packer and tailpipe assembly. RIH 6" bit. Test 9-5/8" casing & 7" liner lap to 3000 psi. Clean out cement to 10,150'. Test cement squeeze to 1000 psi. If squeeze fails to test, RIH with test packer and locate leak. A re-squeeze may be necessary. Clean out to 10630' RIH 9-5/8" casing scraper to 9227'. Reverse circulate. RIH with 7" casing scraper to 10134'. Reverse circulate. Change over to clean brine. RIH an set bridge plug at 9980' RU shooting flange and perforate the well with 5" casing guns and perforate 9861 '-9935' RIH with test packer and frac well. RIH with 6"bit and clean out bridge plug RIH 8.5" gauge ring/junk basket to 9227'. RIH with 6" gauge ring/junk basket to 10100 RIH with WD packer and set at 10070 RIH with 7" tubing with 5-1/2" tail pipe Set 2-way check valve. ND BOP's. NU and test 6"-5M tree to 5000 psi. Pull 2-way check valve. Set plug in the tailpipe. Set 9-5/8" permanent packer. Test tubing X casing annulus to 2500 psi. Shift sleeve open. Displace annulus to 135 bbls diesel & U-tube diesel to tubing. Close sleeve and test for closure. Set BPV. Release rig. RECEIVED scP 1 1989 ' ,/~,.iaska 0ii & Gas Cons. C0mmissi0.~, Ar~ch0rage B.O.P. STACK CONFIGURATION 13-5/8 IN. TRIPLE RAM STACK SO00 PSI WP ATTACHMENT II DRILLING ANNULAR PREVENTER I I. I ] ! I PIPE RAMS i I I 1 I PIPE RAMS L ,] 2 IN. KILL LINE . GATE DRILLING SPOOL I 4 IN. CHOKE LINE GATE GATE )RECEiVEG. s~.~ 1 ~ 1989 Anchorage ! 1 BLIND RAMS BP EXPLORATION HOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: BP'CASED HOLE FINAL LOGS ~xplora.on (Ala=ka) Inc. f~00 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 Date: 04-28-89 80020 The following material is being submiT'J'ed herewith. Please acknowledge receipt by signing a copy of this lett'er and returning It to this office: R-06i LEAK DETECTION/TEMP 04-21-89 W-21 GUN POSITION RECORD 04-21-89 W-21 CET 04-20-89 W-21 CNL 04-20-89 Z-01 PITS 04-22-89 #1 3500-9230 Sch 2"/5" #1 9498-9798 Sch 5" #1 9514-11376 Sch 5" #1 9513-11333 Sch 5" #1 10450-10800.Sch 5" Rece i ved Date Shirley R. McCurry ~ NFORMAY ~ ON CONTROL Wel I Records LR2-1 BP E~PLORATION EOT. TSTON ARCO CEE,~rEO~ '~E.YACO · TO: MOBTL AIt~S REFERENCE: BP F~AL DATA - PRESSURE S~R~EY DATA I NOEXED BP Exploration (Alaska) Inc. gO0 East Sanson Boulevara PO. Box 196612 Anchoracj~ Alaska 99519-6612 (907) 561-5tll Date: 02/24/89 79843 The roi lowing material Is being submit-ted herewith. Please acknowledge receipf by signing a copy of this .let-let and refurning If to fhls office: C-07 Static Gradient 02/I 0/89 Camco R-06 - Static Gradient 02/02/89 Camco X- 17 Static Gradient 02/08/89 Camco Y- 01 Flowing Gradient 01 / 31 / 89 Camco Gas Cons. Commission Ancbor:~ge Rece I ved Jennifer Dietz I NFORMAT i ON CONTROL We l I Records LR2-1 Standard Alaska Production Company 900 East Benson Boulevarc~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 29, 1988 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well R-6 (32-32-12-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, BJP:JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 R-6 Well File B. J. Po-/liCky, S~rvisor Waterflood & Miscible Flood RECEIVED AUG '} t t,q.' ~: ij Oil & Gas Cons. gommission A unit of the original Standard C~I Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS · Operation performed: Operation shutdown [] Stimulate [] Plugging [] Alter casing [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729' NSL, 1400' EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1894' SNI_, 1375' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNI_, 1166' WEL, SEC. 32, T12N, R13E, UPM 1. Present well condition summary Total depth: measured 10688 feet true vertical BKB 9537feet Effective depth: measured 10134 feet true vertical BKB 9026 feet Casing Length Size Structural -- Conductor 110 20X30 S u trace 2627 13 3/8 I nte rmed i ate 9706 9 5/8 Production -- Liner 1454 7 Plugs (measured) Junk (measured) Perforate [] Pull tubing [] 5. Datum elevation (DF or KB) KBD-- 55.09 AMSL feet S. Unit or Property name Prudhoe Bay Unit 7. Well number R-06 (32-32-12-13) PBU 8. Approval number 8-123 9. APl number 5 0 - 029-20388 0. Pool Prudhoe Oil Pool fill at 10134' (06/88) Cemented Measured depth True Vertical depth BKB 605 cof. 144 144 3863 c.f. 2661 2661 1514 c.f. 9740 8671 336 c.f. 9227-10681 8225-9530 Perforation depth: measured 9861'- 9903' (Sag R.) 10000'-10028', 10038'-10066', 10076'- 10136' (Ivishak) true vertical subsea 8723'-8761' (Sag R.) 8849'-8972' (three Ivishak intervals) Tubing (size, grade and measured depth) 4 1/2" L-80 to 9180' with 3 1/2" tailpipe to 9293' Packers and SSSV (type and measured depth) 9 5/8" BOTpacker at 9180'; no SSSV RECEIVED 2. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure AUG ) 1 1988 /daska Oil & Gas Cons. CommissiQn Anchorage · Prior to well operation Subsequent to operation Reoresentative Daily Averaae Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure .... 14000 -- .... 14400 -- Tubing Pressure 1750 1865 4. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 5. I hereby certify that the foregoing is true and correct to the best of my knowledge orm 10-404 Rev. 1"2-'[-85- ~ D ate ~j--//~ Subrn~ in Duplicate The following Sag River interval was :perforated .~unc 20, 1988, using. Schlurnbcrgcr 3 3/8" HyPerdome carrier guns at 4 spf: 9861'. 9903' MD BKB (872Y. 8761' TVDss) Ref. BHCS, 9/27/79 A lubricator was installed and tested to 3500 psi for al/ well work. The well was returned to injection immediately following perforating operations, then tested. jill 8/17/88 RECEIVED AUG 3 I 19~8 _Alaska Oil A Gas Cons. Commission Anchorage Slar~da~,d Alas1, a Production Comp 900 Eo'.~ ~n..On Boule.,o,d P O I~o~, 19661~ Ancho,oge. Aloe. ko 99519-661 ~ 19071 564-51 II DALLAS ARCO CHEVRON E,~-KON TEXACO TO: MO B IL REFERENCE: PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES SAPC CASED HOLE FINAL LOGS I NOEXED STANDARD ALASKa. PRODUCTION 07/07/88 Date: 79062 The following material Is being submitted herewith. Please acknowledge recelpt by signing a copy of this letter and returning It to this office: , A -02 ~ B-09 E-18 ~H-21 R-06 U-13 Spinner 06/25/88 #1 11150-11490 Sch 5" CET 06/23/88 #1 8700-10086 Sch Completion Record 06/21/88 #2 9710-11160 Sch 5" CNL 06/26/88 #1 9100-9898 Sch 5" Leak Det/Temp 06/29/88 ~1 8600-9370 Sch 5" Production Log 06/28/88 #1 11050-11458 Sch 5" Re. ce I veal Date A un, I OI the O,,g,,"'-oI 51ondo~,d C~l Comp, any Founded .,-~ Cl¢-¢lo-d Oh,o .n Jennifer Dietz I NFORY~T I ON CONIRO[ Wel I Records hR2-1 Production Compa, (J~0 EO$! ~nson Boules, oral P.O. Bo~ I~!~ (907! 5~4-~ i I i ARCO -CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSC IENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS INDEXED STANDARD ALASKA PRODUCTION Date: 06/30/88 TI: 79037 The following material Is being submitted herewith. Please acknowledge receipt by signlng a copy of this lette~ and returning It to this office: A-23 B-20 C-03 R-06 ,. CCL 06/18/88 Completion Record Completion Record CCL/Perf Record 06/18/88 06/15/88 #1 10396-10604 Sch 5" ~1 9490-9870 Sch 5" ~1 9638-10132 Sch 5". 9695-10010 Sch 5" Rece i ved Date Jennifer Dietz NFORMAI ~ ON CONTROC Wel I Recocds LR2-1 the oz;~g;nol ~.lom:lo,d O;I Compony in Cle~.eland. CY~;o. ;n 1870. S~ondard Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99,519-6612 (907) 561-5111 ALASKA PRODUCTION June 22, 19 88 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well R-6 (32-32-12-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB:JAM~ Enclosures (9) cc: J. L. Haas (MB12-1) R-6 Well File a~ g roouction Engineering A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS I1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Time extension [] Change approved program [] Plugging [] Stimulate [] 2. Name of Operator Re-enter suspended well [] Alter casing [] Pull tubing [] Amend order [] Perforate [] Other [] Standard Alaska Production Company 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729'NSL, 1400'EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1875' SNL, 1190' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM 5. Datum elevation (DF or KB) KBD = 55.09 AMSL feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number R-06 (32-32-12-13) PBU 8. Permit number 79-52 9. APl number 5 0 - 029-20388 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2627 Intermediate 9706 Production -- Liner 1454 Perforation depth: measured 10688 feet BKB 9537 feet 10354 feet BKB 9228 feet Size Plugs (measured) Junk (measured) FILL @ 10354' 20X30 13 3/8 9 5/8 Cemented Measured depth True Vertical depth BKB 605 c.f. 144 144 3863 c.f. 2661 2661 1514 c.f. 9740 8671 7 336 c.f. 9227-10681 10000'-10028', 10038'-10066', 10076'-10136' true vertical subsea 8849'-8972' (three intervals) 4 1/2" L-80 to 9180' with 3 1/2" tailpipe to 9293' Tubing (size, grade and measured depth) 8225-9530 Packers and SSSV (type and measured depth) 9 5/8" BO Tpacker at 9180'; no SSS V 2. Attachments Description summa~ of proposal ~ Detailed operations program 3. Estimated date for commencing operation July 1988 4. If proposal was verbally approved Name of approver ~'oz'm ~',~o. Dated.--/--/-- Date approved 5. I hereby certify that ~~rue and correct to the best of my knowledge Signed _ Jx~",4~~-~.~~ Title Manager Production Engineering ~{~~' ' (J~/ Commission Use Only Condiflq~s,6f approval Notify commission so representative may witness IApproval No. [] Plug integrity [] BOP;Test I-I~ Location clearance I Approveo [Jopy Approved by ORIGINAL SIGNED BY LONNIE C. SMITH eturned~ Commissioner by order of the commission Form 10-403 Rev 12-1-85 Submit in triplicate R-6iMUD~TREATMENTP~RAM Treatme_nt Procedure 1. Obtain a maximum rate well test. 2. Pull the SSSV. 3. Cut off the XN nipple and drop it to bottom. 4. Make a gauge run for the Nowsco straddle packer assembly which requires a minimum ID of 2.70". TREATMENT 1. Mix or obtain the following fluids: a. 90 bbl 15% HCl/xylene b. 180 bbl Mud acid c. 180 bbl 3% NH4Cl brine d. +50 bbl Methanol e. +50 bbl Produced water (to initially set the packer) Note: Filter all fluids that are to enter the perfs to 3 microns, preferably on the fly while pumping the job. Rig up a CTU with the Nowsco straddle packer assembly set for a 10' straddle, a TEL, and a pump. Approximate length of the packer assembly is 27'. Circulate out any diesel in the coiled tubing. Test the packer assembly as per Nowsco's recommended procedures. Ensure a check valve is installed between the CTU and the pump. Attach a fusible cap to the SSV. Pressure test to 4000 psig. 3. Shut in the well. . RIH with CT at a maximum of 50 fpm pumping filtered produced water as needed to maintain CT pressure. Slow the running speed when passing through any jewelry. Tie-in to the tubing tail. Run in to the liner, and inflate the packers in a blank interval to 1000 psi. Set down with 2000 lbs to verify the set, then release the packers and allow them to deflate. Rig up a pump van. Ensure a check valve is installed between the CTU and the pump van. Pressure test to 4000 psi. kg June 16, 1988 R=6i MUD ACID PROGRAM . Set the straddle packer across each of intervals listed below, inflating them to 1000 psi, and pump the following treatment into each straddled section: a. 10 bbl 15% HCl/xylene b. 20 bbl 12/3 Mud acid c. 20 bbl 3% NH4Cl brine Each stage is to be followed immediately by the next stage with no spacer between stages. The packers are to be released from the treated section and reset across the next section when the acid for the next section is 3 bbl awaY from exiting the coiled tubing. The final stage should be displaced with methanol. Note: Attempt to pump the job observing a maximum bottom hole injection pressure of 5000 psi. If it is necessary to exceed the pressure to treat a section do not hesitate to do so, but lower the pressure as soon as possible. Sections to be straddled and treated are as follows: a. 10000-10010 b. 10010-10020 c. 10020-10030 d. 10035-10045 e. 10045-10055 f. 10055-10065 g. 10075-10085 h. 10085-10095 i. 10095-10105 Put well back on injection after treating this section. Maximum injection pressure: 1000 psi. Displace with methanol. 7. Release the packer, and POH pumping methanol as needed to maintain CT pressure. Return the well to normal injection. 8. RD. POST-TREATMENT . Run an injection profile and temperature survey 2-3 days after completing the treatment. kg June 16, 1988 Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams 2" Chicksan (Kill Line) Slips ~ 'J~ Pipe Rams Pump-In Sub (Circula te/R e turns ) W ell Head Swab Valve Standard Alaska Production Company 900 East Benson BoulevarcJ'----,~ P.O. Box 196612 Anchorage, Alaska 99519-6612 1907} 561-5111 STANDARD ALASKA PRODUCTION February 25, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well R-6 (32-32-12-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. BJP:JAM Enclosures (9) cc: J. L. Haas (MB12-1) R-6 Well File A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. Yours very truly, B. J. ~/olicky, S~pervi~or' Waterflood & Miscible Flood STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS · Type of Request: Abandon [] Suspend [] Operation Shutdown [] Time extension [] Change approved program [] Plugging [] Stimulate [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 729'NSL, 1400'EWL, SEC. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1875' SNI.., 1190' WEL, SEC. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, SEC. 32, T12N, R13E, UPM Re-enter suspended well [] Alter casing [] Pull tubing [] Amend order [] Perforate [] 5. Datum elevation (DF or KB) Other [] KBD = 55.09 AMSL feet 8. Unit or Property name Prudhoe Bay Unit 7. Well number R-6 (32-32-12-13) PBU 8. Permit number 9. APl number 5 0 - 029.20388 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 10688 feet Plugs (measured) true vertical BKB 9537feet measured 10354 feet Junk (measured) FILL @ 10354' true vertical BKB 9228 feet Length Size Cemented Measured depth .. 110 20X30 605 c.f. 144 2627 13 3/8 3863 c.f. 2661 9706 9 5/8 1514 c.f. 9740 .. measured 7 336 c.f. 9227-10681 10000'-10028', 10038'-10066', 10076'-10136' true vertical subsea 8849'-8972'(three intervals) Tubing (size, grade and measured depth) 4 1/2" L-80 to 9180' with 3 1/2" tailpipe to 9293' Packers and SSSV (type and measured depth) 9 5/8" BO T packer at 9180'; no SSS V 12. Attachments True Vertical depth BKB 144 2661 8671 8225-9530 RECEiYEO F E B 2 '9 i988 Alaska Oil & Gas Cons. C0mmlssl0f~ Anchorage Description summary of proposal [] Detailed operations program [] BOP sketch 13 3. Estimated date for commencing operation Feb/Mar 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certif~y, that th~.~,ing i.i.~true and correct to the best of my knowledge Si~lned '~\ ~_.~~~ Title Supervisor Waterflood/Miscible Flood Commission Use Only Conditions of approval Notify commission so representative may witness IApproval No. [] Plug integrity [] BOP Test [] Location clearance I ORIGINAL SIGNED BY Approved by LONNIE N R~TH :orm 10-403 Rev 12-1-85 Approved Copy Returned ~,,,~ Commissioner by order of the commission Submit in triplicatu ~ell R-§ (32-32-12-13).PBU . . ADDITIONAL PERFORATING PROPOSAL We propose to perforate the following Sag River interval for water in~ection during February 1988 at 4 spf: 9861' - 9903' MD BKB (8723' - 8761' TVDss) Depths are referenced to BHCS, 09/27/79 A lubricator will be installed and tested to 3500 psi for all well work. Following perforating operations, the well will be returned to production and tested. NOTE: A previously approved stimulation (approval # 7-79) of this well has been cancelled. " 0833Z 02/08/88 FLOW'TUBES & PACKOFF BOWEN.. PACKO FF ~ J--*- HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE GREASE LINE F£OWLINE VALVE GREASE ! MANIFOLD GREASE PUMP RISER .-,~,-. GREASE RESERVOIR BOP DALLAS ARCO CHEVRON EXXON TEXACO TO: MOBIL PIlILLIPS STATE OF ALASKA GEOSC IENCES INDEXED STANDARD ....... ALASKA PRODUCTION Date: 11/02/87 78287 REFERENCE: SAPC CASED HOLE FINAL LOGS The following materiel Is being submitted herewlfh. Please acknovledge receipt by signing a copy of this lefte~ and returning It to this office: C-11 J-23 N-1 R-6 U-4 U-5' Y-lO WOPITS 10/12/87 #1 9650-9950 Camco 5" Temp. 10/20/87 ~1 2000-4450 CAmco 5" Flowmeter Prod. Log 10/16/87 ~1 8650-8977 Camco 5" Injection Profile 10/21,22/87 #1 9900-10340 Camco 5" Injection Profile 10/17/87 #1 11300-11600 Camco 5" InJestion Profile 10/17/87 ~1 9150-9488 Camco 5" Flowmeter Tamp 10/19/87 ~1 9350-10000 Camco 5" Rece i ved A un,! O! the o~:~,nol S'¢~ndu,d OI ~ounded ,n (~le-eland· C~,o ,n 1870 Victoria Aldridge I NFORHAT I ON CONTROL Wel I Records LR2-1 S~ondo~d AIo~ko Ih, oduction 900 East ~n~ ~ d P.O. ~ 19~12 ~hmoge, Alaska ~519-~ 12 DALLAS ARCO CHEVRON · EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSC IENCES INDEXED STANDARD ALASKA PRODUCTION Oa'~: 06/05/87 Ti: 77952 REFERENCE: SAPC CASED HOLE FINAL LOGS IThe following material is being submit-I'ed here~ith. Please ecknowledge receipt by signing a copy of thls lei-I'er' and returning it to this office= B-9 B-16 C-26 F-5 F-27 H-3 J-5 J-13 J-13 J-23 J-23 N-3 N-3 N-7 R-6 S-6 Received Date Injection Profile Collar Log DFT Production Profile CBT Cont. Flow Survey Cont. Flow Survey Borehole Audio Tracer Survey 05/ DFT 05/03/87 Borehole Audio Tracer Survey 05/ Temp. 05/05/87 DFT 05/12/87 GR. 05/12/87 Caliper 05/07/87 Injection Profile 05/20/87 al 9800-10058 camco 5" 05/19/87 al 9900-10250 Go 5" 05/11/87 al 10500-11760 Go 5" 05/17/87 al 11100-11350 camco 5" 11/06/86 al 9200-10620 Sch 5" 05/11/87 al 9850-10137 Go 5" 05/17/87 al 9950-10260 GO 5" 03/87 #1 2000-11600 GO 2" #2 Surf-il609.5 GO 2" 05/87 al 1000-9800 GO 5" al 39-9800 GO 2" al 11100-11700 Go 5" al 9100-11700 Go 5" al 10100-10571 GO 5" 05/14-15/87 al 9900-10350 camco 5" Cont. Flow Survey 05/10/87 #1 9950~10650 Go 5" / /~,i~ka Oil & GaS'eoCene. Commission . ,.. ~ --J Anchorage k uml al the' orJgJr~l Slondo,d O~1 Company Founded ,n Cleveland. Ghio. ,n 1870 Victoria Aldridge I NFORMAT I ON CONTROL Well Records LR2-1 Siorkdord Aioska P~oclucl;on Compony ~ fo$~ ~enson Goulev P.O. lie, 196612 Ancho~oge. Ato~ko 99519-6612 (907! ~64-5! I I DALLAS ARCO INDEXED CHEVRON - EXXON TEXACO Date: 02/24/87 TO: MOBIL TI: 77739 PHILLIPS 'STATE OF ALASKA GEOSCIENCES STANDARD ALASKA PEODUCTION REFERENCE: SA_PC CASED HOLE FINAL LOGS The following material is being submltfed herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: - A-16 A-17 B-12 B-12 B-19 B-19 E-7 G-23 J-6 M-2 R-2 R-6 S-14 S-20 T-7 Injection Profile 01/27/87 #1 Injection Profile 01/30/87 #1 DFT 01/28/87 #3 Cont. Flow & CCL 0D/28/87 #3 Cont.Flow 01/26/87 #1 Completion Record 02/15/87 #1 CCL/Perf. 02/01/87 -. #1 GR/CCL 02/02/87 #2 Packer Setting 02/13/87 #1 Cont. Flow/Injection Profile 01/28/87 Cont. Flow 02/06/87 #1 Injection Profile 02/9-10/87 #1 Cont. Flow 02/03/87 #1 Production Profile 02/01/87 #2 Injection Profile 01/29/87 #1 9900-11000 Camco 5" 10000-10300 Camco 5" 8850-9300 GO 5" 8850-9300 GO 5" 9350-9700 GO 5" 9200-9718 Sch 5" 9100-9432 GO 5" 8100-9203 Camco 5" 10030-11350 Sch 5" #1 9700-10010 GO 5" 9390-9640 GO 5" 9900-10200 Camco 5" 10150-10900 GO 5" '9150-9750 Camco 5" 9200-9550 Camco 5" Rece i ved Date . A un,I ol the ~'i~nol $~ondo,d Oil Compon!, Jounded ,. Cle,,elo~cl. Ohm. ,n 1870 Standard Alaska Production Company/'''~ 900 East Benson Bouk P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 January 29, 1987 STANDARD ALASKA PRODUCTION Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well R-6 (32-32-12-13) PBU Gentlemen: Enclosed, in triplicate, is Approvals, for the above-named stimulate the well. Form 10-403, Application for Sundry well. This contains our proposal to Yours very truly, JAB:JAM~ Enclosures (6) cc: J. L. Haas (MB12-1) R-6 Well File ~upervisor Production Operations A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. ' STATE OF ALASKA ALAS*"'""OIL AND GAS CONSERVATION COMI'-'SION APPLICA! ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon :- Suspend -- Operation Shutdown - Re-enter suspended well - Alter casing ~_ Time extension ~ Change approved program Z Plugging ~ Stimulate _~ Pull tubing -- Amend order -- Perforate ~ Other 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 1854' SNL, 1188' WEL, Sec. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, Sec. 32, T12N, R13E, UPM 5. Datum elevation (DF or KB) KBE = 55.09 6. Unit or Property name Prudhoe Bay Unit 7. Well number R-6 (32-32-12-13) PBU 8. Permit number 79-52 9. APl number 50--029-20388 10. Pool Prudhoe Oil Pool feet 11. Present well condition summary Total depth: measured true vertical 10688 feet 9537 feet BKB Plugs (measured) Effective depth: measured true vertical 10630 feet Junk (measured) 9483 feet BKB Casing Length Structural Conductor. 89 ' Surface 2640 ' Intermediate 9719 ' Production -- Liner Perforation depth: Size Cemented 20"×30" 605 c.f· 13 3/8" ' 3863 c.f. 9 5/8" 1514 c.f. 1454' 7" 336 c.f. measured 10000' - 10136' (three intervals) true vertical (subsea) 8849' - 8972' ~bing(size, grade and measured depth) 4 1/2" L-80 to 9180' with 3 1/2" tailpipe to 9293' Packers and SSSV(type and measured depth) 9 5/8" BOT packer at 9180'; no SSSV Measured depth 110' 2661' 9740' 9227'-10681' True Vertical depth BKB 110' 2661' 8671' 8225'-9530' 12.Attachments Description summary of proposal ~ Detailed operations program '~ BOP sketch 13. Estimated date for commencing operation February/March 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Si~ ~/~,/1~ Title Supervisor Production Operations Date /' Z~. ~7 UJ. A. Bragg ~ Commission Use Only Conditions of approval Notify commission so representative may witness ~_ Plug integrity ~'~- BOP Test [] Location clearance Approved by Commissioner Approval No.7 _ 7 ¢ by order of the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate Well R-6i (32-32-12-13) PBU STIMULATION PROPOSAL A bullheaded diesel/15% HC1 acid wash to treat iron sulfide sludge material in the wellbore is proposed for water injection well R-6 as follows: a. 25 bbls. diesel preflush w/10% mutual solvent 2000 gal. 15% HC1 w/additives 25 bbls. diesel w/10% mutual solvent 2000 gal. 15% HC1 w/additives 173 bbls. produced water, displacing to perforations Following the treatment the well will be returned to injection and tested. jm 1/28/87 Standard Alasl~a P~oduclion Company 900 Eosl Benson Boulevc P.O. Box 19661? Anchmoge, Alaska 99519-6612 (907) 564-511 I INDEXED DALLAS ARCO CHEVRON EXXON Date: 12/03/86 TEF~CO ,. TO: MOBIL TI: 77563 PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returning It to this office: -~--B-6 Perf. Record 07/08/86 #1 8446-9335 ~Sch 5" -~-~.D-19 EPL 04/25/86 #1 9000-9400 Sch 5" '"--M-14 EPL 04/28/86 #2 10200-10727 Sch 5" '~--M-14 EPL 04/11/86 #2 10100-10900 Sch 5" ~N-2 Multi-finger Caliper 07/02/86 #1 9266-10461 Sch 5"  N-7 Perf. Record 07/06/86 #1 9440-10554 Sch 5" 'R-6 EPL 04/22/86 #1 9700-10400 Sch 5" ~ -~S-16 Perf. Depth Control 07/04/86 #1 10674-11228 Sch 5" ~ S-16 _ Perf. Record 07/15/86 #1 10300-11235 Sch 5" --- X-14 EPL 04/11/86 #2 11490-11567 Sch 5" Gas Cons. ~rnmissi0n Anchorage Race i ved Date A unil of Ihe o,g;nol Sk,,,do~d C)d Co,npony Founded m Cle-elond. O+,,n. ,n 1870 Vic toria Aldridge INFORMATION CONTROL Well Records LR2-1 SOHIO ALASKA PETROLEUM COMPANY February 21, 1986 900 EAST BENSON BOULEVARD ANCHORAGE. ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: 'Mr. C. V. Chatterton PBU Wells N-9, N-10, R-3, R-6, and S-2 Gentlemen: Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on Wells, for each of the above-named wells. These contain our subsequent report to stimulating these wells. Yours very truly, JAB: JAM ~ /~.~A. Brag~ ~~ k~Supervisor Production Operations Enclosures cc: Drilling Well Files (MB12-1) Well Records (LR2-1) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] ;2. Name of Operator SOHIO ALASKA PETROLEUM COMPANY COMPLETED WELL 12] OTHER [] 3. Address P. O. BOX 196612, Anchorage, Alaska 4. Location of Well At surface: 729' NSL, 1400' EWL, Sec. 5. Elevation in feet {indicate KB, DF, etc.) KBE = 55.09' AMSL 12. 99519-6612 32, T12N, R13E, UPM 7. Permit No. 79-52 8. APl Number 50-029-20388 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) PBU 11. Field and Pool Prudhoe Bay I 6. Lease Designation and Serial No. Prudhoe Oil Pool ADL 28279 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing r'] Perforations [] Altering Casing I-1 Stimulate [] Abandon I'-] Stimulation ~ Abandonment [] Repair Well [] Change Plans [-] Repairs Made [] Other [] Pull Tubing [] Other [-I Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10407 for each completion.) 13. Describe Proposed or Completed O~rations (Clearly state all pertinent details and give ~rtinent dates, including estimated date of starting any proposedwork, forAbandonmentsee20AAC25.105-170). A multi-stage bullheaded mud acid treatment was performed on February 8, 1986 on the following perforated intervals. This treatment was preceded by a coiled tubing breakdown mud acid treatment on February 4, 1986. · 10000' - 10028' BKB 10038' - 10066' BKB 10076' - 10136' BKB The initial breakdown treatment consisted of 500 gal. xylene, 1250 gal. 15% HCl w/5% EGMBE mutual solvent, 2500 gal. 12%' HC1 - 3~ HF, 700 gal. 15% HCl, 1000 gal. ammonium chloride, and 70 bbls. 50/50 methanol/water, The bullheaded mud acid'treatment consisted of 1700 gal. gelled 3% ammonium chloride w/700 lbs.'benzoic acid flakes,'4000 gal. 15%. HCl:~w/5%'mut~al solvent, 7200 gal. 12% HC1 - 3% I~ 2000-gal. 15% ~Cl, 200Ogal;· gelled'3%'ammonium chloride-W/000 lbs. benzoic acid flakes. 700 gal. methanol.was pumpea'~to-dissolve the':benzoic acid flakes and injection brine'was flushed to the perforations 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. · he sp~/below for Commission use ' ~J/- A. Bragg Condi ~t~ns of Approval. if any: Approved by. By Order of COMMISSIONER the Commission DaTe Form 10-403 Rev. 7-1-80 Submit "lnlentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 February 11, 1986 Alaska Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well R-6 (32-32-12-13) PBU Gentlemen: · Enclosed, in duplicate, are the following forms for the above- named well. 1. Form 10-407, Completion Report, 2. Form 10-.403, Sundry Notice and Report on Wells, 3. Form 10-404, Monthly Report of Drilling and Workovers. Yours very truly, S. L. Bryan.t Supervisor Reservoir/Production Surveillance Unit PFB:JAM~ Enclosures cc: Drilling Well Files (MB12-1) Well Records (LR2-1) R-6 Well File r --~, STATE Of ALASKA ALASKA;t3 AND GAS CONSERVATION CO,- ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE ~ Water Tnject±ort , 2. Name of Operator 7. Permit Number SOHIO ALASKA PETROLEUM COMPANY 79-52 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50~D29-20388 4. Location of well at surface 9. Unit or Lease Name 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1904' SNL, 1422' WEL, Sec. 32, T12N, R13E, UPM R-6 (32-32-12-13) PBU At Total Depth 11. Field and Pool 1848' SNL, 1166' WEL, Sec. 32~ T12N, R13E, g.PM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) ] 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 55.09' AMSL~ ADL 28279 12. DateSpudded 13. DateT.D. Reached 14. DateComp.,Susp. orAband. 115. WaterDepth, ifoffshore 116. N0. of Completions 9/11/79 9/27/79 1/28/80IIfeet MS L one 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10688'MD 9537'TVD 10630'MD 9483' TvI)YES[~ NO[]I 1992 feetMD 2006' 22. Type Electric or Other Logs Run DIL/SP/GR, BHCS/GR/FDC/CNL/GR/Cal, Sidewall cores 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLESlZE CEMENTING RECORD AMOUNT PULLED 20"x30" Insulate~.Conducto~ Surface 110' 136" 605 cu. ft. Arcticset .13 3/8" 72# L-80 Surface 2661' 17 1/2" 3863 cu.ft. Permafros.t 9 5/8" 47~ L-80 Surface 9740' 12 1/4" 1384 cu.ft. ClassG;12.0 cu.ft. Permafrc 7" 29.~ L-80 9227' 10681' 8 1/2" 336 cu.ft. Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) MD TVDss SIZE DEPTH SET (MD) PACKER SET (MD) Prudhoe Oil Pool Top: 10000 ' 8849 ' 4 1./2" 9293 ' 9180 ' Bottom: 10136 ' 8972 ' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10000' - 10028' BKB (8849 ' - 8874' TVDss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10038' - 10066' BKB (8883' - 8908' TVDss) 10076' - 10136' BKB (8918' - 8972' TVDss) 27. PRODUCTION TEST Date First Production i Method of Operation (Flowing, gas lift, etc.) .... Date of Test Hours Tested PRODUCTION FOR OIL-BB'L GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED ,~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (~orr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEi\,'ED ~t Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE . · : G: (~:i(~ MAi~K-~Rs' .... 'FOR~IATION:TE-' 'ST ' ' EOLO : ~' ' ":' ' .... ::' ........ ' ' ': ' ....... ' " "' : .~ ~ -' ~ : ': S: ' · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT, DEPTH GOR, and time of each phase. BKB Subsea Sag R. SST. 9848' 8711' Shublik 9905' 8762 ' Ivishak 9995 ' 8844 ' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~S~L ~2~ ant~~ Title Supervisor, Res '/Date . . Brv Prod. Surveillance II INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in~situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10~,07 STATE OF ALASKA '-" ALASKA O,,_ AND GAS CONSERVATION COi,.,vllSSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL [] OTHER I1. 2. NameofOperator 7. PermitNo. SOHIO ALASKA PETROLEUM COMPANY 79-52 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20388 4. Location of Well At surface: 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) _~C!~_E = 55.09' i~_MSL 6. Lease Designation and Serial No. ADL 28279 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data PBU NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~r] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Aba ndonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following additional water injection interval was perforated January 27, 1986, using Schlumberger 2 1/8" Hyperdome guns at 4 spf: 10000' - 10018' BKB (Ref. BHCS/GR, 9/27/79) RECEIVED Ir ?. A!aska 0il & G~ C~. commission Anchorage .14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Supervisor, Res ./Prod. The space belowTor Q~ommission use · . Surveillance II Date Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date ........ Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate STATE OF ALASKA ~--. ALASKA C._ AND GAS CONSERVATION cO,..,vllSSlON MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS !1. Drilling well [] Workover operation [] 2. Name of operator 7. Permit No. SOHIO ALASKA PETROLEUM COMPANY 79-52 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20388 4. Location of Well at surface 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 55.09' AMSL 6. Lease Designation and Serial No. ADL 28279 For the Month of January ,19 86 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. R-6 (32-32-12-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner ru.n and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run 16. DST data, perforating data, shows of H2S, miscellaneous data 1/27/86: Rigged up Schlumberger and perforated the interval 10000'-10018'BKB (Ref. BHCS/ GR, 9/27/79) using 2 1/8" HyperdOme guns at 4 spf. The well was put back on injection~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~. _ ~-,'~7~'/, ~ Supervisor, Re s./Prod. DATE -'~'///~' SIGNED ~TITLE Surveillance II for eacl~calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska NOTE--Report on tSis form is required Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10404 Submit in duplicate SOHIO ALASKA PETROLEUM COMPANY JanuarY 10, 1986 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well R-6 (32-32-12-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to perforate the well. Yours very truly, PFB:JAM~~ Enclosures (3) P. F. Barth Supervisor, Reservoir/ Production Surveillance Unit I RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. SOHIO ALASKA PETROLEUM COMPANY 79-52 3. Address 8. APl Number P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 50-029-20388 4. Location of Well At surface: 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) 12. J 6. Lease Designation and Serial No. ADL 28279 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate ]~]( Alter Casing [] Perforations [] Altering Casing [-] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10.407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following additional water injection interval will be perforated during January/ February 1986 at 4 spf: 10000' - 10018' BKB (Ref. BHCS/GR, 9/27/79) ,,,ECEIVED Alaska 0il & &as Cons. uummissi0n Anchorage 1.4. I hereby certify that the foregoing is true anxd/:orrect to the best of my knowledge. Signed Title Supervisor Reservoir/ProductionDate The space below for Commission use P. F. Barth Surveillance Unit I Conditions of Approval, if any: Approved by .. z:'~p proved Copy ]~eturned By Order of COMMISSIONER the Commission Form 10-403 Submit "Intentions" in Triplicate n_ . ~ nn SOHIO ALASKA PETROLEUM COMPANY December 4, 1985 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well R-6 (32-32-12-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB: JAM'~?L ~upervisor Production Operations Enclosures (3) cc: Drilling Well Files (MB12-1) Well Records (LR2-1) R-6 Well File R .CEIVED 0 !) ~,las~a Oil & Gas Cons. CorrlmiSSiOrt Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator Sohio Alaska Petroleum Company 3. Address P. O. BOX 196612, Anchoraqe, Alaska 4. Location of Well At surface: 7. Permit No. 79-52 8. APl Number 99519-6612 50- 029-20388 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM R-6 (32-32-12-13) PBU 11. Field and Pool Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool __ KBE = 55.09' AMSL I ADL 28279 12. Check Appropriate 8ox lo Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) Altering Casing [] Abandonment [] Other [] [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A multi-stage bullheaded mud acid treatment is proposed for the following perforated inter- vals in R-6 water injection well, preceded by a coiled tubing breakdown mud acid treatment 10018' - 10028' BKB 10038' - 10066' BKB 10076' - 10136' BKB The initial breakdown treatment will consist of: 500 gal. 1250 gal. 2500 gal. 700 gal. 1000 gal. The bullheaded xylene 15% HC1 with 5% EGMBE mutual solvent 12% HC1 - 3% HF 15% HCl 3% ammonium chloride water mud acid treatment will consist of: RECEIVED Alaska Oil & f3as Cons. C, OFtl~i$sjgfi Anchorage 700 gal. 2000 gal. 3600 gal. 1000 gal. 1000 gal. 2000 gal. 3600 gal. gelled 3% ammonium chloride water w/700 lbs. benzoic acid flakes 15% HCl with 5% mutual solvent 12% HC1 - 3% HF 15% HC1 gelled 3% ammonium chloride water w/1000 lbs. benzoic acid flakes 15% HC1 with 5% mutual solvent 12% HC1 - 3% HF 1000 gal. 15% HCl 700 gal. methanol will be pumped to dissolve the benzoic acid flakes and injection brine will be flushed to the perforations. This work is scheduled to commence in December, 1985 34. I hereby certify that the foregoing is true and correct to the best of my knowledge. "~i~ned ~ ~~ Title Supervisor Production Operatior~ete The spa¢¢below for Commission use [/ (fJ. Ao Bragg Conditions of Approval, if any: Approved by COMMISSIONER Approved C~y RetLtrn~d By Order of the Commission Date Form 10-403 Submit "Intentions" ,n Triplicate SOHIO ALASKA PETROLEUM COMPANY CHEVRON EYKON To~SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS BPAE 31 I 1 "C" ST[1EET ANCttORAG[, ALASKA TELEPHONE [907l 265-0000 MAIL: POUCH 6-6 ! 2 ANCHORAGE. ALASKA 99502 Date: 10/23/85 Tt/: 76511 REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: i;-4A GR-Position Tbg. 07/22/85 f/1 9400-10546 Sch 5" i~-18 EPL 08/02/85 ~tl 9650-10220 Sch 5" R-6 EPL 08/30/85 .~/1 9800-10373 Sch 5" R-6 EPL 09/01/85 ~2 9800-10200 Sch 5" D^ I t . ,~ %-: -~>'~ , _~ ~ ..i--.. ,.,-'+-"- \.ictoria Aldridge LR2-1  .-~-..--...: .' Technical Documentation /, /- ! ....... .~ ~,.~ ~ L:?-.:S <J~"~" .~" ' Records Management ~ ' -' t: ~ :;'. -', :;' ' SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON TO: SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE OF AK . - BPAE 31 1 1 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 9-27-85 T#: 76460 REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowiedge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: F-9 M-9 R-6 8-10-85 8-21-85 8-14-85 8 -15-8 5 CFS (spinner) 9750-10060 GO #1 5" Temp (pump-in) 10000-10586 GO 1 #1 5" Temp (dynamic) 9800-10400 GO #1 5" Temp (shut-in) 9800-10400 #2 'J RECEIVED DATf  y Perkins Lr 2-1 -. ~-. ?.' ?'-i i~' .,.~i~¼~,-' Tec~hnical Documentation ~ 9 Records Management INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TEXACO ~o: SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE BPAE (Transmittal Only) 311 I "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612. ANCHORAGE, ALASKA 99502 Date: T#: 09/16/85 76433 REFERENCE: SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- ~'~A-1 ~ Static 08/21/85 Camco ~A-5j Static 09/02/85 Camco ~-8 / Static 07/09/85 Camco ~A-11 - static 09/05/85 Camco __~-16- Static 08/22/85 Camco -17 .z~ Pres.Drawdown 08/07/85 Camco ~-27~ Pr es. Drawdown 07/12/85 Camco -"'~B- 6 ' Static 09/09/85 Camco ~"C-16- BHPD & PBU 09/01/85 Camco ~-17-' Static 08/26/85 Camco ~E-17 Static 08/28/85 Camco ~--F-9-- PBU &-BHPD 08/12/85 GO ~'M- 9 ~' PBU 07/11/85 Camco ~-~-~R-6-'~ PBU & BHPD 08/15/85 GO ~R-9-'~ Flowing Gradient 08/20/85 Camco '~'R-2~ Step Rate Test 05/29/85 Sch ~R-24' Data Frac 05/29/85 Sch "~U-4 - Static 09/05/85 Camco ~-U-5j Static 09/05/85 Camco Static 08/30/85 Camco  -5' Static 09/04/85 Camco -6~ Flowing Gradient 08/27/85 Camco ~'~Y-S" . Static 09/07/85 Camco ~'~-ll/Flowing Gradient & ]SHPD 08/26/85 Camco RECEIVED DATE Victoria Aldridge LR2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHQRAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502~612 September 1 O, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr, C V, Chatterton Well R-6 (32-32-12~13) PBU Gentl emen- Enclosed in duplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above named well. Yours very truly, R. S. Allan District Drilling Engineer RSA:SRB :JLH:kkm 091 085: 0661 N Enclosure cc: T. N. Tyler, MB9-2 Well Records (LR2-1) P. E. Well File #17 Drilling Well File #17 RECEIVED 1 . . ~ STATE OF ALASKA ' ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WEL S 1. DRILLING WELL [] COMPLETED WELL ~ 2. Name of Operator I 7. PermitNo. SOHIO Alaska Petroleum Company I 79-52 ~ 8. APl Number 3. Address P. 0. Box 6612, Anchorage, Alaska 99502 5°-029-20388 9, Unit or Lease Name 4. Location of Well At Surface: Pr'~d hn~ 729' NSL, 1400' EWL, Sec. 32, TI2N, R13E, UPM 1-O~V~ell'h~u~nb~r"~ ..... p R /' q')_~'~_~ '~_1 ~ ~pB ,III ~ 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) KBE = 55,09' AMSL 12. Perforate Stimulate Repair Well Pull Tubing [] Other [~ Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Prudhoe Bay I6. Lease Designation and Serial No. ADL 28279 Check Appropriate Box To Indicate Nature of Notice, Report, or O~l~e~)'~a NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) [] Alter Casing [] Perforations [] Altering Casing [] Abandon [] Stimulation [] Abandonment [] Change Plans [] Repairs Made [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Well R-6 is a produced water injector. A channel behind the 7" liner was identified from the lowest perforated interval to the 0WC. The intent of the work performed was to cement squeeze the channel using a coiled tubing unit. The work performed is outlined as follows: · · 4. 5. 6. Laid heavy mud from PBTD to 1 01 80' G" Pumped 15 bbls. of low fluid ioss Class " squeezed off all perforated .intervals, (10018' 10038' -- 10066', 10076' -- 10136'). Contaminated cement in wellbore. Reversed out contaminated cement after 12 hours. Re-perforated the original Put well back o.n injection. cement and -- 10028', intervals as listed in Step #2. The above work was successfully completed on September 6, 1985 and verbally approved by Mr. Lonnie Smith in a telephone conversation with Scott Bundy on September 8, 1985. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ ~- (~~-~- Title District Drilling Engineer The space below for Commission use Date Conditions of APproval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO: SFo/UNiT/STATE: TEXACO (-.Marathon) MOBIL PHILLIPS STATE 'OF AK-" BPAE 311 I "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 7/26/85 TI/: 76340 REFERENCE: SOHIO CASED HOLE FINAL LOGS // The following material is being submitted herewit~~ease acknowledge receipt by signing a copy of this letter and returning it to this office:- _-I ? CN~ 3/17/85 #3 9100-9772 .... Sch 5" 10-/ CNL(CNTD2 1/2") 5/20/85 #1 10850-11672 Sch 5" Q-3f CNL 3/16/85 #4 8600-9428 Sch 5" M-i/' EPL -3/2/85 #1 8600-8899 Sch 5" M-9-" EPL 3/10/85 #3 9950-10300 Sch 5" R-6/' EPL 1/10/85 #3 9850-10400 Sch 5" A-8j DFT 7/9/85 #1 9590-9840 Camco 5" A-17 / Temp. 7/7/85 #1 9850-10750 Camco 5" A-27-" DFT 7/12/85 #1 8800-9300 Camco 5" H-9~_ DFT 7/11/85 #1 9600-10356 Camco 5" U-3/ Temp. 7/05/85 #2 8950-9550 Camco 5" U-9 j Temp. 7/3/85 #2 10850-11300 Camco 5" R£CE~VED 19 Oil & Gas Cons. Cornrnissiorl Anchorage Victoria Aldridge LR2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO: SFO/UNIT/STATE: TEXACO (.Marathon) MOBIL PHILLIPS STATE BPA~ (Transmittal Only) 3111 "C" ANCHORAG[ ALASKA I[:LEPHONE 1907) 265-0000 MAIL: POUCH 6.612 ANCHORAGE, ALASKA 99502 Date: 4/02/85 T#: 76095 REFERENCE: S~FINAL DATA - PRESSURE SURVEY DATA f/The following material is being submitted herewith. Please ackr~owledge receipt by signing a copy of this letter and returning it to this office:- S-14 R-6 Pressure Falloff Pressure Falloff 1/03/85 Scln 1/13/85 Scan Rf_CEIVED DATE Cathy Perkins LR 2-1 Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 December 18, 1984 Alaska Oil &Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well R-6 (32-32-12-13) PBU Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our subsequent to reperforating this well. w JAB/~/pj James A. Bragg District Petroleum Engineer (Acting) Enclosures cc: A. E. Leske Geology Well File #17 Oil & Ga.~ Cons. Cc, remission Anchora.~je r--, STATE OF ALASKA ALASKA LAND GAS CONSERVATION C(. MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator Sohio Alaska Petroleum ~y 3. Address P.O. Box 6612, Anchorage, Alaska 99502 4. Location of Well At Surface: 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 55.09' AMSL 12. I 6. Lease Designation and Serial No. ADL 28279 7. Permit No. 79-52 8. APl Number 50-029-20388 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Apl~ropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate' [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [~ Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals in this well were reperforated December 16, 1984 using Schlumberger 2-1/8" enerjets at 4 spf. A lubricator was installed and tested to 3500 psi for all well work. 10,018'-10,028' BKB (Ref. BHCS/GR, 9-27-79) 10,038'-10,066' BKB ( " ) 10,076'-10,136' BKB ( " ) An SSSV was set and tested in the ball valve niPPle at 1992'. ,.1~. hereby certify that th~ue an~rect to the best of my knowledge. n Title District Petroleum Engineer The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1430 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ~'~- ANCHORAGE, ALASKA ¢/ TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 / ANCHORAGE, ALASKA 99502-0612 /f ~,. December 14, 1984 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive' Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well R-6 (32-32-12-13) PBU Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to reperforate the well. JAB/~pjw Enclosures James A. Bragg District Petroleum Engineer cc: A. E. Leske Geology Well File ~17 REc..r- IV F..D r%'~'"r-' z, ,984.- STATE ALASKA ~'~-. AND GAS CONSERVATION CC-~,MISSION SUNDRY I ,,JTICES AND REPORT JN WELLS 1. DRILLING WELL [] COMPLETED WELLZ3 OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum ~y 79-52 3. Address 8. APl Number P.O. Box 6612, Anchorage, Alaska 99502 50-029-20388 4. Location of Well At Surface: 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, I/PM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. KBE = 55.09' AMSL I ADL 28279 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) PBU 11. Field and Pool ?z~dhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate' I~ Alter Casipg [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals will be reperforated in De~, 1984 using Schlumberger 2-1/8" enerjets at 4 spf. A lubricator will be installed and tested to 3500 psi for all well work.- 10,018'-10,028' BKB (Ref. BHCS/GR, 9-27-79) 10,038'-10,066' BKB ( " ) 10,076'-10,~36' BKB ( " ) i? r:'!j z, An SSSV will be set and tested in the ball valve nipple at 1992'. Alaska Oil & Ga',:; (;nn~ {,~; mlissioP, *Verbal approval of this job was given to Mike Martin of Sohio by Mike Minder Of the State of Alaska the morning '.of December 14, 1984. Subsequent Y¥'°rk I{eported o. Fhereby certify that the foregoing is true a~;~ect to the best of my knowledge. ig~ _r~~~_,~,--'E...,~,-~~ Title District Petroleum Engineer The space below for Commission use Conditions of Approval, if any: Approved by COMMISSIONER Approv~ Cupv ilmturnsd By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY SFO A~CO CHEVRON EXXON 31 I 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 To~SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS BPAE CENTRAL FILES (CC# ' s-Transmittal Only) Date: 11-28-84 CC#: 75898 REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 9-23-84 #1,2,3,4 9250-9810 Sch 5" 9-3-84 #1 8900-9020 Sch ~ 9-27-84 #2 Surf-10577 Sch 5" 8-23-84 #1 50-10500 Sch 5" 9-6-84 #1 Surf-10250 Sch - 8-29-84 #1 10050-10350 Sch 5 '11/84) RECEIVED OAT[ Ai~tsk:~ Oi~ & GsS Cons. Con, mission Anchorage Carolyn Bishop Development Geology Well Records ~ ~DEXED SOHIO ALASKA PETROLEUM COMPANY S¥0 ARCO CHEVRON EXXON TO- SFO/UNIT/STATE: GETTY (-Marathon) MOBIL PHILLIPS BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only) 3111 °'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 10-15-84 CC#: 75802 REFERENCE: SO~I~O FINAL DATA- PRESSURE SLrRVEY DATA ~'~The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- M-20 R-6 PBU & PBU Data Sheet 9-23-84 Pressure Fall-off & Data Sheet 9-27-84 C~mco Sch (4/82) RECEIVED DATE Carolyn Bishop Development Geology Well Records Alaska OJi & g-'as Co,is. Commission SOHIO ALASKA PETROLEUM COMPANY ~O~ SFO/UNIT/STATE ' (-Marathon) SFO ARCO CHEVRON EXXON GETTY MOBIL PHILLIPS STATE BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only) 3111 "C"SIREEI ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL. POUCH 6.612 ANCHORAGE, ALASKA 99502 Date: 6-26-84 CC#: 75441 REFERENCE: SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipl by signing a copy of this letter and returning it to this office:- R-6 Static Survey 6-7-84 GO (4/82) RECEIVED DA T I Car()] '...' ~, Deve].opmen t G(.,ol ogy Well Record~ SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON 3111 '°C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 GETTY To:SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE! BPAE (Transmittal 0nly) CENTRAL FILES (CC#'s - Transmittal Only) Date: CC#: 5-18-84 75311 REFERENCE: S0~4~ FINAL DATA - PRESSURE SURVEY DATA L/The following material is being submitted herewith. Please acknowledge receipt by signing a . copy of this letter and returning it to this office:-- WEST y'ND TEST WELL PBU & PBU Data Sheet PBU & PBU DATA Sheet STEP RATE TEST 4-25-84 GO 5-12-84 GO 4/15-17/84 Dresser (4/82) RECEIVED DATE 19 Carolyn Bishop Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 February 29, 1984 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Gentlemen: Enclosed, well. Mr. C. V. Chatterton Well R-6 (32-32-12-13) PBU in duplicate, are the following forms for 1. Form 10-407, Well Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells. the above named GJP/~/pjw Enclosures cc: J. D. Hartz Geology Well File ~17 Yours very truly, troleum Engineer '-' .... -- STATE OF ALASKA ALASK,?' :~_AND GAS CONSERVATION (- "4MISSION ~~~/ WELL COMPLETION OR RECOMPLETION REPORT AND LO 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICERS] Water Injection ... 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum (bmpany ?9-52 8. APl Number 3'~¢c~6e~ 6-612, Anchorage, Alaska 99502 5o-029-20388 4. Location of well at surface 9. Unit or Lease Name 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM prudhoe Bay Unit At Top Producing Interval 10. Well Number 1904' SNL, 1422' WEL, Sec. 32, T12N, R13E, UPM R-6 (32-32-12-13) At Total Depth 11. Field and Pool 1848' SNL, 1166' WEL, Sec. 32, T12N, R13E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 55,09' AMSLI ADL 28279 12. Date Spudded 13. Date I.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 9/11/79 9/27/79 1/28/80J feet MSL 17. Total Depth (MD+TVD) 18.Plug Back Depth(MD+TVD) 19. Directional Survey I 20. Depth Where SSSV set 21. Thickness of Permafrost 10688'MD 9537'TVD 10630'MD 9483'TVD YES E~ NO[~I 1992 feetMD 2006' 22. Type Electric or Other Logs Run DIL/SP/GR, BHCS/GR/FDC/f/qL/GR/Cal, Sidewall Cores 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" x 30 " InsulatedConducto~ Surface 110 ' 36" 605 cu. ft. Arcticset 13 3/8" 72# L-80 Surface 2661' 17 1/2" 3853 fu.ft. Permafrost 9 5/8" 47# L-80 Surface 9740' 12 1/4" 1384 cu. ft. Class 6; 130ft. Perma_fros' 7" 29# L-80 9227~ 10681' 8 1/2" 336 cu. ft. Class 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD , , interval, size and number) MD TVDss SIZE DEPTH SET (MD) PACKER SET (MD) 4 1/2" 9293' 9180 ' Prudhoe Oil Pool Top: 10018' 8865" Bottom: 10136" 8972 ' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 10018'-10028' BKB (8865'-8874' TVDss) 10038'-10066' BKB (8883'--8908' TVDss) 10076 '-10136 ' BKB (8918'-8972'- TVDss) 27. PRODUCTION TEST Date First ProductiOn I Method of Operation (Flowing, gas lift, etc.) 1-27780I Water Injection Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I~ I Flow.Tubing Casing Pressure CALCULATED' OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) PreSs. 24-HOUR RATE I~ ?8. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ,'.: ........ Form 10-407 Submit in duplicate Rev. 7-1~80 CONTINUED ON REVERSE SIDE 2g. 30. · GEOLOGIC MARKERS FORMATION TESTS . NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. _.. BKB ~$e~ Sag R. SST. 9 84 8 ' 8711" Shublik 9905 ' 8762 ' Ivishak 9995 ' 8844 ' 31. LIST OF ATTACHMENTS 3(~ I hereby certify,~pat the foregoing is true and correct to the best of my knowledge Signed~Z~~~~'~"b' ~'~ ~TitleDiStrict Petroleum En~ieneer INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevatign is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". STATE OF ALASKA ---- ALASK..,:tLAND GAS CONSERVATION L r~,iMISSlON SUNDRY NOTICES AND REPORTS ON WELLS OTHER 1. DRILLING WELL [] COMPLETED WELL [] 2. Name.of ODerato_r 7. Permi.~o.52 Sohzo Alaska Petroleum Oompany 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029:20388 4. Location of Well 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 55.09' AMSL I 6 . Lease Designation and Serial No. ADL 28279 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [~: Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). This well was converted from a Prddhoe Bay production well into a produced water injection well for 1984 P.W.I. water evaluation on February 20, 1984. Water was injected through the following perforations at 4 s.p.f. 10018'-10028' BKB (Ref. BHCS/GR, 9-27-79) 10038'-10066' BKB ( " ) 10076'-10136' BKB ( " ) hereby certify/at the foregoing is true and correct to the best of my knowledge. ed ~.~ Title District P~troleum Enqineer Zhespace el w for Commission use, ace/~t, //U ~/ Conditi~'ns ~f Approval, if any: ~ Date By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 January 27, 1984 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 Attention: Mr. C. V. Chatterton Gentlemen: Well R-6 (32-32-12-13) PBU Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to convert an oil well into a water injection well. GJP/~/pjw Enclosures Yours very truly, istrict Petroleum Engineer CC: J. D. Hartz R. M. Mayer Well File ~17 STATE OF ALASKA ~" ALASKA OIL AND GAS CONSERVATION CUMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL[] COMPLETED WELL[] OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum ~y 79-52 3. Address 8. APl Number Pouch 6-612, Anchorage, AK 99502 50- 029-20388 4. Location of Well At Surface: 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 55.09' AMSL I6. Lease Designation and Serial No. ADL 28279 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other j~] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). With reference to the previous Sundry ~tices dated January 7, 1980 and February 7, 1980 for the perforation of R-6 in the 7" liner, it is intended to convert this Prudhoe Bay Production well into a produced water injection well during February/March 1984 for additional GC-2 PWI capacity. Water will be injected through perforations (4 spf) at: 10018'-10028, BKB (Ref. BHCS/GR,09-27-79) 10038'-10066' BKB ( " ) 10076'-10136' BKB ( " ) JAN 3 ,o 'i984. -~t ~o~k, ~ . ~q/¢l~4'~L~ka Oil & Gas Coho. Commission o~ Fo~m No. ~ 14. I hereby/6ertify that the foregoing is true and correct to the best of my knowledge. Signed.~/¢~~//' Co~mission~use~A ~o-~/ ~ TitleDiStrict Petroleum Engineer Th,p, 7~ below for / / Co~tions of Approval, if any: Date Approved by 6RIG~NA[ SIGIlIEB 8Y [OH~'~.LE C. SMITII Approved Copy Returned By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 November 8, 1983 Alaska Oil & Gas Conservation Ccmm%tssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. Lonnie Smith, Conm%isssioner Gentlemen: W~L?'. 'R-6 '(32-32-12-13) PBU Reference is made to your letter dated October 12, 1983 re above- named well. Enclosed, in duplicate, is Form 10-403, Sundry Notices - Subsequent report of notice of intention dated 6-1-81 as you requested. This work Was not performed. ThiS should complete your records on this well. Very truly yours, District Drilling Engineer cc: Well File #17 STATE OF ALASKA ALASKA (JIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS i. DRILLING WELL [] COMPLETED WELL ;~. Name of Operator 7. Permit No. Sohio Alaska Petroleum Cc~pany 79-52 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20388 OTHER 4. Location of Well At surface: 729' NSL, 1400' E~K., Sec. 32, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc;) KBE = 55.09' AMSL 12. 6. Lease Designation and Serial No. ADL 28279 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing r-'] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The work outlined for Well R-6 in the Sundry Notice of Intention dated 6-1-81 was not performed. 14. ! ~e. reby ~ that thp foreg~i~true anql~,orrect to the best of my knowledge. s~,g,: ~_ ~ ~ Tide District Drilli.nq Enqineer The space below for Commission use R.H. Reile~ Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Submit "Intentions" in Triplicate October 12, 1983 ~-r. R. }~. Reiley, District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Subsequent P. eports, Sundry ~otices and ~_e¥.~rts on Wells (Fo~n-n 10-403) Dear ~.4r. Reiley: For the follcwin~3 lists of "Eotice of Intention ~'o:" Sundry i~otices and Reports cn ~ells (form 10-403) this oflice dc>es not have on record the "Subsequent P. epcrt el:" defining tke acticn taken on the approved intention. Please advise this ofiice k~y Subsequent Report of t~e dis~osition of the intention. Well Sohio Date Y-i2 01-14-81 E.- 9 05-22-81 R-6 05-30-81 Y-1 07-30-81 L~-i0 09-22-~-1 f-~-! C i0-14-~! }{-!2 10-20-81 Erie£ De_sc_rip~tion of I~tenticn Ceased drilling o~erations. gqueeze c e~en t. Perforate l~r...ur and squeeze c er:ent. i~.el~.lace l~roduction packer. l{e~lace l~rceucticn z-acker- ~u~: tubin~ %~it!: 9as t~ft equit~ment. P.e~lace col la~med gas lift ~andrel. .~r. R. P~. Beiley Cctoh~r 12, 1983 Page 2 Well Sag Delta Sag Delta S-1 T-7 Sincerely, Ionnie C. Smith Commissioner LCS/~: lc ~ 105 ~ D8 Sohio Date ~ .... ~-~_ ...... 12-12-81 01-21-82 ~ ~-82 04-15-82 04-20-82 Brief ~_D_e$criptlcn_ o~_ I_nte_nt_ion Y{e-enter to test. Suspend drilling oi~erations. Revised Plug back and redrill. Change plans. SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 EXXON TO: SFO/UNIT/STATE' (-Marathon) GETTY MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) _ CENTRAL FILES (CC#' s-Transmittal Only) Date' 8/8/83 CC#: 74627 REFERENCE: __O_HI__OHO__._~__LE FINAL LOGS CASED The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: /E-18 /E-!9 7'B-22 .-M-2 ~.X-4 /X-13 ~-H-11 iX-14 ~-A-23 ~-X-18 ~-R-6 CNL 6/14/83 #1 10250-11184 Sch 5" DDNLL/GR 3/20/83 #1 10850-11730 Dres 5" Spinner 7/17/83 #2 10800-11100 Otis 5" Temp. 7/20/83 #1 10000-10350 Otis 5" Temp. Diff. 7/22/83 #1 9500-10050 Otis 5" Temp. Diff. 7/24/83 #1 10000-10480 Otis 5" C/O 4/1/83 #1 9130-9600 Dres 5" GEL 5/24/83 #1 11000-11205 Sch 5" PFC/GR 3/23/83 #- Dres 5" PFC/GR 4/7/83 #- Dres 5" C.A.T. Log 4/9/83 #1' 100-9209 Dres 5" (4/82) RECEIVED DArE Victoria Aldridge Development Geology Well Records TP 1-5 SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6.612 ANCHORAGE, ALASKA 99502 April 26, 1983 Alaska Oil & Gas Conservation Conmtission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton 'Well 'R-6 (32-32-12-13) (PBU) Enclosed, in duplicate, is Form 10-403, Sundry Notice-and Reports on Wells, for the above-named well. This gives Subsequent Report of pulling tubing in well. Very truly yours, R. H. Reiley District Drilling Engineer encs cc: Well File #17 STATE OF ALASKA '~-'~ ALASKA L~IL AND GAS CONSERVATION CO,v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHERJ~ 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 79-52 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 s0-029-20388 4. Location of Well 9. Unit or Lease Name Prudhoe Bay Unit At Surface: 729' NSL, 1400' ~L, Sec. 32, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 55' AMSL 6. Lease Designation and Serial No. ADL 28279 10. Well Number R-6 (32-32-12-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stim u late [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The 7" tubing and packer were pulled from Well R-6. A new string of 4 1/2" tubing was run complete with production packer, sliding sleeve and gas lift mandrels. This ~rk was completed April 13, 1983. 14. I hereby certify, that the foregoing is t~e and correct to the best of my knowledge. \, ~' ~ , _ IR / District Drilling Engineer Signed ~ ~ ~.~l~t.~ / ~~Title ' The space below for Commission use ~. ~~e~ Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1430 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 March 30, 1983 Alaska Oil & Gas Conservation Co~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: 'WRT'.T'. 'R-6 (32-32-12-13) PBU Enclosed in triplicate is Fo~m 10-403, Sundry Notices and Reports on Wells, for the above-named well. This gives notice of intention to repair the well. Very truly yours, R. H. Reiley District Drilling Engineer encs Anchorage STATE OF ALASKA -" ALASKA UlL AND GAS CONSERVATION CO,v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER :~g~ 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 79-52 3. Address 8. APl Number Pouch 6-612, Anchoraqe, Alaska 99502 50- 029-20388 4. Location of Well At Surface: 729' NSL, 1400' EWL, Sec 32, T12N, R13E UPM. 6. Lease Designation and Serial No. ADL 282 79 5. Elevation in feet (indicate KB, DF, etc.) KBE = 55' AMSL 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well ["- Change Plans [] Repairs Made Pull Tubing ~] Other [] Pulling Tubing (Note: Report multiple completions on Form 10o407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is intended to pull the present 7" completion, clean out to PBTD and rerun new 4 1/2" completion with gas lift mandrels. This operation is scheduled for April, 1983. o~ Form ~°'/ MAR3 i ~'~ :' Alaska 0il & Gas Cuns~ (;ommission Anchorage 14. I hereby certify that thee foregoing is true and corJlegt to the best of my knowledge. The space below for Commission use R.H. Reiley Drilling Engineer Date 03/30/83 Conditions of Approval, if any: Approved by QIIIiIIItlT BY tOl,,:qlE C. $111ll Approved Copy Returned By Order of COMMISSIONER the Commission Date Form 10403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 June 1, 1981 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well R-6 (32-32-12-13) Enclosed, in triplicate, is Form 10-403, Sundry Notice and Reports on Wells, for the above-namedwell. This contains our proposal to repair the well. RHR:ja Enclosures cc: Well File #17 Yours very truly, District Drilling Engineer RE£EIVED JUN - 1 1981 011 & Gas Cons. Commission A,3chorage STATE OF ALASKA -"~ ALASKA'~IL AND GAS CONSERVATION CC ..,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 79-52 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 s0-029-20388 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 4. Location of Well At surface: 5. Elevation in feet (indicate I<B, DF, etc.) KBE = 55.09' AMSL 6. Lease Designation and Serial No. ADL 28279 9, Unit or Lease Name Prudhoe Bay Unit 10. Well Number R-6 (32-32-12-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] ~ Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Well R-6 will be worked over due to high water production starting June 23, 1981. The proposed work is as follows: 1. Move in rig and kill well with NaC1 workover fluid. 2. Pull tubing and retrieve packer. 3. Perforate liner and squeeze cement. 4. Run 5 1/2" tubing and gas lift equipment. 5. Move rig off. RECEIVED JUN - 1 1981 Alaska 011 & Gas Cons. Commission Anchorage 14. I hereby/~ce~~true and correct to the best of my knowledge. Signed ~ ---v-...~,.., .----------.~. TitleDiStrict Drilling Engineer The space below for Commission use R. H.~eiley Conditions of Approval, if any' ORIGINAl SIGNED' BY LOHNIE C. SMITH Approved by. COMMISSIONER Date Approved Copy Returned 8y Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO PETROLEUM COMPANY Division of Sohio Natural Re.~ources Company ARCO SOHIO-BP ALASKA PRODUCTION DIVISION C}:cvr~- --',~"~ ....... · 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCtt 6-612 ANCHORAGE, ALASKA 99502 REFERENCE: SOHIO DATA ' ~he following material is bein§ submitted herewith. Please acknowledge receipt by si§nih§ a copy of this letter and returning it to this offi..ce:- _ .......... , ........ · ....... -' -- SFO/UNIT/STATE: (-Marathon) SFO/UqqlT/STATE: (-Marathon) D-14 Y-3 BottomHole Pressure Data Form & Survey F-4 CH CNL 2/1/80  EPL 1/25/81 ~....:-¢- - ?../. ,, .~_f' RECEIVED 2/4/81 (Ca~',mo) 2/14/81(Go) #5 5" #1 5'~ Carol Krieter Well Records Con't... Alaska Oil & G,qs Cons. Con]mission Anchorage SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: SFO/UNIT/STATE: REFERENCE: Mobil--=~----~ ~ ~ Phillips ~ ' -' "" B?AE _ ' - SFO -- ' " 3111 "C" STRt~ET i ANCHORAGE, AL~SKQi.. TELEPHONE (907)a65'-~00": ANCHORAGE, ALASKA. 99502 ' ~ ~~} ~ .,... -- " ......~ ,. . 2/10/81 #6; - ! s?,T -r~c CONFER: FIEF: SOHIO DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: (-Marathon) Pressure Survey & BottomHole Pressure Data Fom (Sch) 1/26/81 " " " " " "(Otis) 1/30/81 Carol Kriet Well Records DATE F~'I ~ 1981-~ N~ 0il & Gas Cons, Commission ~chorage 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SFO/UNIT/STATE: ~ ~ -~ 12/15/80 ~/52t (-Marathon) '~ .,,..----~- SFO/UNIT/STATE: (-Marathon) SOHIO--BP ALASKA PRODUCTION DIVISION TO: REFERENCE: l'-'/-cot,,',N~__b..l.. 3111 "C" STR~- ANCHORAGE, TELEPHONE (907)~R~~ MAIL: POUCH 6b~'i-'3 GEOL' ~ I STAT TLC I ' [~'~[~; / S.0~IO FINAL CASED HOLE DATA ,,"The following material is being submitted herewith. Please acknowledge receipt by signing a ~,/ copy of this letter and returning it to this office:-- M-3 Spinner 11/17/80 #1 5" Q-3 Flowmeter .~?' R-4 ~ CCL ii/lo/so #1 ~" 11/26/80 · #1 5" Carol Kr~E Well Records DATE 19 Oil & Gas Cons. Commission Ancharar,,', SOHIO. PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION ARCO TO: EXXON PHILLIPS SF0 ANCHO RAG E, AL---..A~. K. ,A.. - TELEPHONE (90d:~6~;d060;C: MAIL:POUC'h,66i2,-~ l'-'i I._% ' ' ...... 9/~6/80 ST/.,T T~C. REFERENCE: SOHIO MAGNETIC TAPES  ,~'~ following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office'-- : On Transmittal #338, Dated 9/4/80, first tape was listed s D-4. Should be D-14. Label on tape is wrong, Print out is correct. H-10 Magnetic Tape 7/25/80 #2 #60764  " " 5/16/80 #2 #60557 X-11 " " 8/11/80 #1&2 #60736 (Also, for your convience, I Will put a check in the upper right corner of the box with the transmittal in it and put the address lable on the same box. Sorry for the past inconvience.) Well Records 19 ..L I ~ 1ENG  8OHIO PETROLEUM 'j .... 2 Er,~o~ ~, s~T GOMPANY I ~ 3 ::.. ANCFORAGE, ALASKA (907) 265-0000 SOHIO-BP ALASKA PRODUCTION DIVISION ~~ - ' - :~ i ~ C~H~RAGE, ALASKA 99502 _ TO: SFO/U~IT/STATE Mobil , Phillip, , BI:'AE i i i __ z I ST:~TTEC CONFER: 6/~.2 .... [FILF: I i i L I L ___ '80 ~1226 ~FO/UNIT/STATE REFERENCE: SOHIO CASED HOLE FINAL LOGS · .  T~he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- B.-8 CNL 5/22/80 .~/2 5" C-3 CNL 5/28/80 ,~/1 5" C-8 CNL 5/25/80 t/3 5" C-9 CNL 5/28/80 tt'l 5,4 D-5 CNL 5/30/80 It2 5" E-2 CNL 5/25/80 tt6 5" E-5 CNL 5/29/80 ¢/2 5" J-2 CNL 6/04/80 ~/3 5" J-5 CNL 5/24/80 ~/5 5" N-5 CNL 5/31/80 ~/2 5" N-6 CNL 5/26/80 I/2 5" Q-2 CNL 5/23/80 t/1 5"  CNL ' 5/23/80 t/1 5" TDT-M 5/16 / 80 ti 2 5" ~nn~ B'arns Well Records Redi-Kwik0 Quality Litho SOHIO PETROLEUM COMPANY (" ?/~;~ ,7,.,' ..~ 3111 "C" STREET Division of Sohio Natural Resources Company ~.~,~ ,4 ~ICHORAGE, ALASKA (907) 265-0000 SOHIO--BP ALASKA PRODUCTION DIVISION TO: SFO/UNIT/STATE (-Marathon) ~ ii i i J __ M. obil ..... -- ~ilhps .... , _ BPAE ....... SFO . , REFERENCE: S~HIO FINAL CASED HOL, E DATA ' · The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 6/9/80 #190 B-1 Flowmeter 4/30/80 #1 5" B-3A' Spinner 10/19/79 #1 5" B-6 Spinner 10/30/79 t/1 5"' D-11 Temperature 5 / 12 / 80 # 1 5" E-1 Spinner 5/9/80 #1 5" E-7 Temperature 4/30/80 #1 5" F-1 Spinner 4/25/80 #1 5" F-4 Spinner 5/6/80 #1 5" H-3 EPL 4/30/80 #1 5" M-2 Spinner " 4/27/80 #1 5" M-6 Spinner ~ 4/8/80 #1 5" N-2 Spinner 4/6/80 5" X-6 Diff. Temp. Log '-5/1/80 #1 5" X-7 Temperature :, 5/13/80 #1 5" Getty St. #1 TDT-M ,- 5/7/80 #1 5" A-4 CNL '~ 5/18/80 #2 5" D-4 CNL 5/20/80 #3 5" F-10 CNL '~ 5/19/80 #1 5" H-7 CNL . 5/20/80 tt3 5" 5/13/80 #1 5" X-4 CCL/Per. ,  EPL 5/17/80 #2 5" Carol Krieter~ Wel.1 Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company ~J I GEOL ·oE°L GEOL J STAT TEC CONFFR: ~ILF: - 3111 "C" STRE T ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 SOHIO-BP ALASKA PRODUCTION DIVISIONr~J~OO C~ - TO: MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 SFO/UNIT/STATE REFERENCE: 5/8/80 #131 ,. SOHIO DATA .. ~:g The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office'-- EO/UNIT/STATE: (-Marathon) C-5 Pressure Gradient Survey/Raw Data 3/20/80 E-5 BohtomHole Pressure Data Form & Survey 3/10/80 E-6 " " " " " " 4/13/80 F-1 :; " " " .... 4/25/80 M-2 " " " " " " 4/27/80 N-1 " " " " " " 4/10/80 N-5 " " " " " " 4/18/80 ~~BottomHole Pressure Data Form & Survey 3/12/80 (Dresser.) ( Schlum. ) (Otis) (Go) (GO) ( Schlum. ) (otis) ( Schlum. ) Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: -- 'i ARCO ! ' ' .. PHILLIPS · , . EXXON ....... 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 5/13/80 #144 · SFO · · ' .. REFERENCE: , . · . . -SOHIO MAGNETIC TAPES . //~e~ following material is being submitted herewith.. Pleaseacknow]edge receipt by signing a copy' of this letter and returning it to this office'- MAGNETIC TAPES ON THE 'FOLLOWING: C-8 J-1 J-9 12/31/79" 7/232.79 11/26/79, 3/13/80" 4/12/80 #60136 #60200 #60053 #60352 #60421 -. - ar~o~l/ Krieter' ' ' Well Records R i~':~. C [~ ,I. 'V i:,. D R E CE,~-y ED ~ ~ ..... DATE 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION C~ TO: SFO/UNIT/STATE REFERENCE: I 'STAT TEC -- . STAT TEC C~t~- ' -' ' -?~6~F'~-~~. -- ; FILF~ ....... 4/18/80 -- i SFO ~ SOHIO DATA /  //~,The following material is being submitted herewith. Please acknowledge receipt by signing copy of this letter and returning it to this office:- A-2 SFO/UNIT/STATE: C-7 FINAL CASED HOLE: E-2 (-Marathon) F- 13 J-1 R-2 R-6 X-4 X-5 PRESSURE SURVEYS :~D-1~/ ~¢ ~E-3~/ ~¢'"'"" ,-~ / E-4J oL' - Spinner 3/8/80 #1 EPA 3/3/80 ~1 EPA 3/7/80 #1 Temp. Log 3/4/80 #1 Spinner 3/7/80 #1 DDNLL 3/3/80 #1 TDT-M 3/14/80 #1 TDT-M 3/13/80 #1 EPA 3/11/80 #1 Mudlog 12/25/79-1/23/80 Temp. Log 3/5/80 #1 Spectralog 2/20/80 #1 #110A 1! 2"/5" (1 Log) 5" 5" 5" 5" 5" 5" 5" 5" Bottom-Hole Pressure Data Form& Survey 3/10/80 (Otis) 3/17/80 (Go) 3/16/80 (Otis) 2!11!80 (Go) Well Records · RECEIVED DATE " SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company 3111 "C"STREET ANCHORAGE, ALASKA SOHIO-BP ALASKA PRODUCTION DIVISION TO: SFO/UNIT/STATE REFERENCE: ARCO Exxon Mar~tbo~ ........ Mobil Phillips ....... ---- . BPA_E SFO , - _ _ - .... - _-_ TELEPHONE (907)265.0000 MAlt.: POUCH 6-612 ANCHORAGE, ALASKA 99502 3/12/80 #057 'FO/UNIT/STATE: 'CH-Marathon) SOHIO DATA "he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- "O/UNIT/STATE: A-6 Spectralog 1/20/80 F-1 Spectralog 1/22/80 J-1 CNL(Corrected Log) 3/30/79 R-1 Spectralog 1/18/80 R-1 DDNLL 1/19/80 R-1 DDNLL 1/18/80 R-3 TDT-M 2/2/80 Y-1 CNL 2/3/80 C-14 Sidewall  Sidewall ......... __S~dewall Sample Rac.2/ll/80 Sample Rec.12/4/79 Sample Rec.9/28/79 #1 5" #1 5" t~l 5" ~1 5" ~ 1 5" #1 5" !~ 1 5" ~tl 5" ~! 1 5" ~!]- 5" ~ 1 5" 19 Wall R, aqords i ; . ; ,.;r ;. ,, ,. , SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA ,- Alaska Oil & Gas Conservation ~ort 3001 Porcupine Drive (') Ancho-age, Alaska 99501 Att-~' i¥,I-. H. Hamilton 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 ARCO/EXXON/SFO PHILLIPS/STATE 2/11/80 #013 REFERENCE: SOHIO DATA .//q~e following material is ~ing submitt~ herewith. Please acknowled~ receipt by signing a copy of this le~er and returning it to this office:-- F-9 Magnetic Tape & Lis%ing 12/2/79 #60040 ,, ,, ,, 4/28/79 #57035  ,, ,, ,, 9/27/79 #57070 X-2 ,, ,, ,, 11/21/79 #60050 Well Records RECEI 19 SOHIO ALASKA PETROLEUM COMPANY February 11, 1980 Alaska Oil & Gas Conservation Cc~m~ission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton i--I ANCHORAGE,~ I~K- ,-- ANCHORAGE, ALASK Gentlemen: Well R-6 (32-32-12-13) Enclosed, in duplicate, is Form P-7, Cc~pletion Report, for the above-named well together with the Well History and Core Data Sheet. This well hasbeenperforatedand is now on pro- duction. PRJ: ja Enclosures cc: Well File #17 Yours very truly, SOHIO ALASKA PETROLEUM CO. P. R. Judd District Drilling Engineer Form SUBMIT IN DUPLI. CE* . . STATE OF ALASKA (See other In- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* WELLLJ DRY [~] Other b. TYPE OF COMPLETION: NEW WORK DEEP-I---] PLUG [---I DIFF. WELL[X] OVER [] EN I I BACK.I I RESER.~] Other 2. NAME OF OPERATOR Sohio Alaska Petroleum Company 3. ADDRESS OF OPERATOR Pouch 6-612,. Anchoraqe, AK 99502 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* Atsurface 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM At top prod. interval reported below Attotaldept~904' s~n, 1422' WEL, Sec. 32, T12N, R13E, UPM 1848' SNL, 1166' WEL, Sec. 32, T12N, R13E, UPM 5. APl NUMERICAL CODE 50-029-20388 6. LEASE DESIGNATION AND SERIAL NO. ADL 28279 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. R-6 (32-32-12-13) 0. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 32, T12N, R13E, UPM 12. PERMIT NO. 79-52 9/11/79 9/27/79 1/28/80 KBE = 55.09' AMSL 21.31' AMSL 10688'MD 9537'TVD ~0'MD 9483'TV~ HOW MANY' 21. ROTARY TOOLSTotal ,NTERVALS DRILLED BY 22. PRODUCING INTERVAL{S), OF_THIS, i,op: COMPLETLON ]~0.I-0 i8, DltTjD T_OP ROI-TOM , N A %E9(~8. & tTVD TVD)* 23. WAS SURVEY DIRECTIONAL MADE Prudhoe Oil Pool: Bottczn: 10,136'MD 9027"TVD Yes Pool 24. TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, SideWall Cores _ 25. CASING RECORD {Report all strings set in well) CASING SIZE 20" x 30" 13 3/8" 9 5/8" 7" 26. WEIGHT, LB/FT. / GRADE I DEPTH SET (MD) Insulated ~ondu~or 110' 72g I Ir80/ 2661 ' 47# L-80I 9740' 29# L-80 19227-10681' LINER RECORD HOLE SIZE I 36" ] 7~"' 12¼" 8¥' I SCREEN (MD) r27. CEMENTING RECORD AMOUNT PULLED 605 cu, ft. Arcticset 1384 cu.ft. C1~sG:130~ 336 ~.ft. Class G · TUBING RECORD , ft. P~l~frost SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* SIZE DEPTH SET (MD) 28. PERFORATIONS OPEN TO PRODUCTION (Interval, size and number) 10,018 '-10,028 ' BKB0.5"@4S.p.f. (Ref. BHCS/C=R9-27--7 10,038'-10,066'" " " " " 10,076 '-10,136 " " " " 7" 9294 ' PACKER SET (MD) 919] ' 29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. ~_ )_DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 30. DAT./E-FIR ST PRODU(~TION PRODUCTION . IPRODUCTION METHOD (Flowing, gas lift, I~umping~ize and type of pump) I Flowing DATE OF TEST. FLOW TUBING PRESS. HOURS TESTED CASING PRESSURE CHOKE SIZE CALCULATED 24-HOUR RATE 31. DISPOSITION OF GAS (Sold, used for fuel, vented, etc.) PROD'N FOR OIL--BBL. TEST PERIOD OIL--BBL. GAS--MCF. I' IWELL STATUS (Producing or sh"t"~roducinq GAS--MCF. WATER--BB L. IGAS--OIL RATIO I [ ~ L_, l~..~..~'~', ~,~r-,l[BJiii~.v ~_.: D J OIL GRAVITY-APl (CORR,) '.~,'~, I ...... ~ 1, ITESTW'TNESSEDBY~ 32. LIST OF ATTACHMENTS Well Histo~; Core. Da~ Alaska Oi! & 33. I hereby certify that thews complete and correct as determined from all SIGNED ~, ---.-_ TITLE ~T._qrI~__TC'_rF _rl~TT,T,TlkT. G *(See instructions and Spaces for Additional Data on Reverse Side) DATE INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement": Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval tobe separarely produced. (See instruction for items 20 and 22 above). ,, , 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, 35. GEOLOGIC MARKERS WATER AND MUD NAME MEAS. DEPTH TRUE VERT. DEPTI BKB $~_~ Sag R. SST. 9848' 8711' Shublik 9905 ' 8762 ' Ivishak 9995 ' 8844 ' 36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER. See Attached Sheet WE~,T, R-6 (32-32-12-13) WELL HISTORY September, 1979 Spud well at 1300 hours, September 11, 1979. Drilled 17 1/2" hole to 2700'. Ran 67 jts. 13 3/8" 72# L-80Buttress casing to 2661'. Cemented with 3853 cu.ft. Permafrost II cement. Installed and tested BOPE. RIH to 2618', tested casing. Drilled to 2727'; ran leak-off test. Directionallydrilled 12 1/4" hole to 9750'. Ran 250 jts. 9 5/8" 47# L-80 Buttress casing to 9740'. Cemented in tw~ stages: First stage with1384 cu.ft. Class G cement; second stage through DVpacker at 2583' wi~h 130 cu.ft. Permafrost cement, preceded by Arctic Pack. Cleaned out to 9682', tested casing to 3000 psi. Drilled out to 9776', ran leak-off test. Directionally drilled 8 1/2" hole to 10688'. Ran open hole logs and sidewall cores. Ran 36 jts. 7" 29# L-80 Buttress casing to 10681'. Cemented with 336 cu.ft. Class G cement. October, 1979 Cleaned out casing to 10630'. Tested casing %o 3000 psi. Displaced well to NaC1. Ran CBL log. Ran 229 jts. ~~# L-80 AB-IJ-4S tub'.mng to 9294'. Landed tubing with ball valve nipple at/~018!d Installed and tested tree. Displaced tubing to diesel. Set packer a~-93zgi', tested tubing to 3500 psi. Released rig at 1800 hours, October 4, 1979. January, 1980 Pressure tested tubing and inner annulus. Rigged up Dresser Atlas and perforated the following intervals using 3 1/8" guns @ 4 s.p.f.: 10,018-10,028 Ft. BKB (Ref. BHCS/GR, 9~27-79) 10,038-10,066 Ft. BKB (" " ") 10,076-10,136 Ft. BKB (" " ") February, 1980 Closed in well in preparation for static pressure survey. ..Ran static pressure/ temperature survey at 8800 ft. TVDss. Set and tested insert sleeve and SSSV in ball valve nipple ca. 2000 ft. Well put on production. SOHIO ALASKA PETROLEUM COMPANY February 7, 1980 3~ "c" S~'REE¥~ ' ! .... ':'"""" -.I ANCHORAGE, ALAS~A__I 4 ENG-~ MAIL: POUCH 6-61~2--,-"q ,.-.~~ State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupihe Drive~ Anchorage, Alaska 99509 Attn: Mr. H. Hamilton Re: Well R-6 (32-32-12-13) Enclosed please find, in duplicate, Form 10-403, Sundry. Notices and Reports on Wells; and Form 10-404, Monthly Report of Drilling and Workover Operations, for the above-referencedwell. Very truly yours, SOHIO ALASKA PETROLEUM C(IMPABDZ District Field Engineer Enclosures CC: S. Bundy A. E. Leske Drilling File Form 10-403 REV. 1-10-,73 Submit "1 ntentlons" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.) 2. NAME OF OPERATOR Sohio Alaska Petroleum Cc~pany 3~ ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 4. LOCATION OF WELL At surface 729' NSL, 1400' ~L, Sec. 32, T12N, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 55.09' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20388 6. LEASE DESIGNATION AND SERIAL NO. ADL 28279 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit West 9. WELL NO. R-6 (32-32-12-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 32, T12N, R13E, UPM 12. PERMIT NO. 79-52 )orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAI RING'WELL FRACTURE TREATMENT ALTERING CASING SNOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all ~rtlnent details, and give pertinent dates, Including estimated date of starting any proposed work. The following intervals were-perforated during January, 1980, using Dresser Atlas 3 1/8" guns @ 4 s.p.f.: 10018-10028 Ft. BKB (Ref. BHCS/GR, 9-27-79) 10038-10066 Ft. BKB (" " ") 10076-10136 Ft. BKB (" " ") A SSSV was run and tested in the ball valve nipple, and the well put on production. (This space for Statl~'office use) TITLE District Field Engineer DATE. APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side Form N~). 10404 REV. 3-1-70 SUBMIT 1N DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. WELL WELL OTHER 2. NAME OF OPERATOR Sohio Alaska Petroleum Cc~pany 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 4. LOCATION OF WELL 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 5. APl NUMERICAL CODE 50-029-20388 6. LEASE DESIGNATION AND SERIAL NO. ADL 28279 7. IF INDIAN'ALOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit West 9. WELL NO. R-6 (_32-32-12-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Ba¥-t Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 32, T12N, R13E, UPM 12. PERMIT NO. 79-52 13.REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. January 23, 1980: Pressure tested tubing and inn0~.. 'annulUs. January 27-28, 1980:Rigged up Dresser Atlas and perforated the following intervals using 3 1/8" guns @ 4 s.p.f.: 10,018-10,028 Ft. BKB (_Ref. BHCS/GR, 9-27-.79) 10,038-10,066 Ft. BKB (_" " ")_ 10,076-10,136 Ft. BKB (" " ") February 4, 1980: Closed in well in preparation for static pressure survey. February 6, 1980: Ran static pressure/temperature survey at 8800 Ft. TVDss. February 7, 1980: Set and tested insert sleeve and SSSV in ball valve nipple ca. 2000 ft. Well put on production. 14. I hereby ~ ~) SIGNED eerti~the NOTP-Report on this' {orm is requirod {or oach calondar month, rogardlo~ of tho ~tatus of oporations, and mu~t bo {dod in duplicato with tho oil and gas ¢onsorYation committee by the l§th of the succc~ling month,unl~',s othorwiso direct~l. ,~T, R-6 SID~:-IAI3', COPE P~PORT 10633 19605' 1056O 10534 10523 10515 10438 10423 10367 10350 10305 i0270 -10251 10235 10225 10187 10177 10156 10128 10105 10075 10070 10969 10043 10034 10O0! 9959 9936 9825 10580 10570 10546 10505 10480 10460 10410 10390 10360 10325 10260 10220 10218 10216 10200 10180 10216 10200 lO!gO 10160 10146 10144 10142 10140 10138 PL:<~very yes yes yes yes no yes yes yes no yes yes yes yes no yes no .ilo yes yes no yes yes- ilo yes no no yes yes ilo yes no rio' . yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes no yes yes yes no Shale ~q~ndstone Sanc~stone Sandstone Sandstone Se~qdstone F~3ndstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone S~ale F~ndstone Sandstone Shale Shale Sandstone Sandstone Sandstone Cla_v .Shale Sandstone Sandstone Shale Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone .~3ndstone ,~ndstone Sand. stone Sandstone Sandstone F~andstone Depth Recovery_ 10120 10002 9997 9992 9908 9902 9804 9844 10578 10570 10523 10492 10470 10454 10434 10398 10380 10340 10315 10293 10280 10235 10214 10212 10193 10187 10146 10138 10114 10082 10065 10051 10040 10025 10015 10001 9970 9908 yes no yes yes D.O yes yes yes yes yes no yes yes yes yes yes yes yes yes yes .yes no yes yes yes no yes yes yes yes yes yes no yes yes no y.es yes Sandstone Sand. stone Sandstone Sandstone S_hale Snale Shale Sandstone Sandstone Sandstone S~ndstone Sandstone Sandstone Sandstone F~ndstone Shale ~ndstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Fandstone Shale SOHIO ALASKA PETROLEUM COMPANY January 7, 1980 I co~/'" I coM,~ ~ 3111 "C" STRE~ ANCHORAGE, ANCHORAGE, ALASK, 99~0~ ENG ~ ~O~OL I ~ --I'~-s ~1 STAT TEC ~t-STAT TECj CONFER: ~ .... ........ ~1[~: State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 Attn: Mr. H. Hamilton Re: Well R-6 - (42~32-12-13) Gentl~: Please find enclosed, in triplicate, Form 10-403, Sundry Notices and Reports on Wells, for the above-referenced well. Very truly yours, GJP :mLh Enclosures cc: S. R. Bundy A. E. Leske Drilling File SOHIO ALASKA PETROLEUM COMPANY g District Field Engineer Form 10-403 REV. 1-~0-73 · Submit '1 ntentions" In Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for 13roDosals to drill or to deepen Use "APPLICATION FOR PERMIT--~' for such Droposals.} 2. NAME OF OPERATOR Sohio Alaska Petroleum Ccmpany 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 4. LOCATION OF WELL At su trace 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 55 KBE' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20388 6. LEASE DESIGNATION AND SERIAL NO. ADL 28279 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit West 9. WELL NO. R-6 (42-32-12-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bayt Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 32, T12N~ R13E~ UPM 12. PERMIT NO. 79-52 sort, or Other Data NOTICE OF INTENTION TO-- TEST WATER SHUT-OFF E~ PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF-' WATER SHUT-OFF ' E~ REPAIRING WELL ½ FRACTURE TREATMENT ALTERING CASING SNOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. ~ne follc~in9 intervals will be perforated during january/February, 1980 ~ using Schlumberger's 2 7/8" guns @ 4 s.p.f.: 10018 - 10028 ft. BKB (Ref. BHCS/GR 9/27/79) 10038 - 10066 ft. BKB (" " ") 10076 - 10136 ft. BKB (" " ") A SSSV will be set and tested in the ball valve nipple ca, 2000 ft. 16. I hereby certi h the foregoin s true'and correct SIGNE DATE TITLE DATE /- //-~ d I~Y ORDER OF THE COMMISSION See Instructions On Reverse Side [~.~pproved .~: Returned SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company soHIO-BP ALASKA PRODUCTION DIVISION TO: STATE OF AL,:,$:<A Al.".ska Oil & Gas ConServation 8001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H, Hamilto~ 3111 "C"STHEET ANCHORAGE, ALASKA TELEPI4ONE (907} 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 October 31, 1979 State/Unit/P&p REFERENCE; Well Data Transmission Ilowing material is being submitted herewith. Please acknowledge receipt by signing a .6/ copy of this letter and returning it to this office:- Logs for the following wells: .R~.5 CPL Run 1' ............. Temp Run G-6 Spinner Run 1,2 CNL Run 1 'G-7 CNL Run 1 QjonthlyWell Test Summary Report - September Q-7Q-4Q-6Q-5-7 Bottom-Hole Transient ,,'"' Pressure pressure'""' ' ' & Data Flowmeter Spinner ,," _ Data Data/Data,,,, Packet '""' Packet ,,'"' 9,~9/79 9/15/79 9/6/79 9/16/79 9/24/79 Colette Tracy ~/ Geological Aid L/ SOHIO PETROLEUM COMPANY Division of Sohi~ Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION October 24, 1979 ,. CC" :" .':, ". ( ~C,.",~,' "/ ' __~I ;':::-:., t~i~' 3111"C"STREET -. ANCHORAGE, ALASKA :~ 7 ~ TELEPHONE (907) 265-0000 .... - -: ~~C~OR~G~, ~[~S~ Alaska Oil & Gas Conservation ~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well R-6 (32-32-12-13) Enclosed, in duplicate, is Form P-7, Completion Report, for the above named well together with the Well History, Well Imgs, Directional Surveys, and Sidewall Core Data. This well has been suspended pending perforating operations. PRJ: ja Enclosures cc: Well File #17 C. Tracy - Geology Yours very truly, SOHIO PETROLEUM COMPANY District Drilling Engineer -7 SUBMIT IN D[ - .STATE OF ALASKA 01L AND GAS CONSERVATION COMMITTEE In- stru,.,,ons on reverse side) WELL COMPLETION OR RECOMPLETION REPORT AND LOG* WELLI I DRYr'~ Other b. TYPE OF COMPLETION: NEW ~ WORK DEEP-[~I PLUG [~1 DIFF. WELL~_I OVER [~ EN I I BACK-I I RESER.[-~ Other 2. NAME OF OPERATOR Sohio Petroleum Company, Div. of Sohio Natural Resources Co. 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage: Alaska 99502 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* 0/lit;I/VA/. 5. APl NUMERICAL CODE 50-029-20388 6. LEASE DESIGNATION AND SERIAL NO. ADL 28279 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9 WE. LL NO~. (~-6 (32-32-12-13) 10. FIELD AND POOL. OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool At surface 729' NSL, 1400' EWL, Sec. 32, T12N, R13E, UPM At top prod. interva~ reported below top Sag R. SST. 1922' SNL, 1492' WEL, Sec. 32, T12N, R13E, UPM At total depth 1848' SNL, 1166' WEL, Sec. 32, T12N, R13E, UPM 1. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 32, T12N, R13E, UPM 12. PERMIT NO. 79-52 13. DATE SPUDDED9/11/79 [14. DATE T.D. REACHED9/27/79 1115' DATE COMP' SUSP' OR ABAND'10/4/79 116' ELEVATIONS(DF' RKB' RT' GR' ETc)*~ =r'55! 09 ' AMSL [17. ELEV. CASlNGHEAD21.31, AMSL I OI2 21'. ROTARY TOOLS DEPTH HOW MANY* CABLE TOOLS 10688'MD 9537'TVD 10630'MD 9483'TV~ I Total 22. PRODUCING INIERVAL(S), OF THIS COMPLETION -- TOP, BOTTOM, NAME (MD & TVD)* 23. WAS DIRECTIONAL SURVEY MADE None Yes 24. TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, Sidewall Cores 25. CASING RECORD (Report all strings set in well) CASINGSlZE WEIGHT, LB/FT. / GRADE / DEPTH SET (MD) HOLE SIZE 20"x30" '_nsulated C~nducto~ 110' 36" 13 3/8" 72~ ! L-80 ! 2661' 17½" ,, 5/8" , 47# ! L-80 / 9740' 12~" i29~ ! L-80 19227-10681' 8~" 26. LINER RECORD SIZE TOP (MD) BOTTOM (MD) sAcKs CEMENT* SCREEN (MD) 28. PERFORATIONS OPEN TO PRODUCTION (Interval, size and number) None CEMENTING RECORD 605 cu.ft. Arcticset 3853 cu.ft. Permafrost 1384 cu.ft. Class G~: 130 3~6 c~.ft. Class G 27. SIZE ,, TUBING RECORD DEPTH SET (MD) 9294' AMOUNT PULLED cu.ft. Pen~afrost PACKER SET (MD) 9191' 29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 30. PRODUCTION DATE FIRST PRODUCTION DATE OF TEST. ]HOURS TESTED ]CHOKE SIZE ] PROD'N FOR TEST PERIOD PR ESS. 24-HOUR R_ATE 31. DISPOSITION OF GAS (5old, used for fuel, vented, etc.) IPRODUCTION METHOD (Flowing, gas lift, Dumping--size and type of pump) [ WE LL STATUS (Producing or shut-In) OIL--BBL. GAS--MCF. WATER--BBL. I GAS-OI L RATIO GAS--MCF. 32. LIST OF ATTACHMENTS Well History, Well Logs, Directional Surveys, Sidewall Core Data 33. I hereby certify that the f .o~ attached information is co~nplete and correct as determined from all available records. SIGNED -- -r/~ TITLE District Drilling Engineer F. 1-(, *(See instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item' 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple Com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26' "Sacks Cement"' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS NAME MEAS. DEPTH TRUE VERT. DEPT BKB Subsea Sag R. SST. 9848' 8711' Shublik 9905 ' 8762 ' Ivishak 9995 ' 8844 ' '" 36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER. See attached sheet. W~.T. R-6 (32-32-12-13) September, 1979 Spud welI at 1300 hours, September 11, 1979. Drilled 17 1/2" hole to 2700'. Ran 67 jts. 13 3/8" 72# L-80 Buttress casing to 2661'. ~ted with 3853 cu. ft. Permafrost II c~n~nt. Installed and tested BOPE. RIH to 2618', tested casing. Drilled to 2727'; ran leak-off res%. Directionally drilled 12 1/4" hole to 9750' Ran 250 jts~ 9 5/8" 47~ L-80 Buttress casing to 9740'. Cemented in ~ stages: First stage with 1384 cu.ft. Class G cement; second stage through DV packer at 2583' with 130 cu. ft. Permafrost cement, preceded by Arctic Pack. Cleaned out to 9682', tested casing to 3000 psi. Drilled out to 9776', ran leak-off 'test. D~ectionally drilled 8 1/2" hole to 10688'. Ran open hole logs and sidewall cores. Ran 36 jts. 7" 2.9# L-80 Buttress casing to 10681'. Cemented with 336 cu. ft. Class G cement. October, 1979 Cleaned out casing to 10630'. Tested casing to 3000 psi. Displaced well to NaC1. Ran CBL-log. Ran 229 jts. 7" 26~ L-80 AB-IJ-4S tubing to 9294'. Landed tubing with ball valve nipple at 2018'. Installed and tested tree. Displaced tubing to diesel. Set packer at 9191', tested tubing to 3500 psi. Released rig at 1800 hours, October 4, 1979. 10633 10605 10560 10534 10523 10515 10438 10423 10367 10350 10305 10270 10251 10235 10225 10187 10177 10156 10128 10105 10075 10070 10560 10043 10034 10001 9959 9936 9839 9825 10580 10570 10546 10505 10480 10460 10410 10390 10360 10325 10260 10220 10218 10216 10200 10180 10216 10200 10180 10160 10146 10144 10142 10140 ~v~38 SIDE?-~I,I, COPE Recove .ry yes yes yes yes no yes yes yes no yes. yes yes yes no yes no no yes yes no yes yes no yes no no yes yes no yes no no yes yes yes y~ yes yes yes yes yes yes yes yes yes yes yes yes yes yes no yes yes yes no Shale Shale Sandstone Sandstone Sandstone Sandstone Sea~dstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Shale Fx3ndstone Sandstone Shale Shale Sandstone Sandstone Sandstone Sandstone Clay ~gnale Sandstone Sandstone Shale Sandstone Sandstone Sandstone Sandstone Sandstone ~3ndstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Depth Recovery_ .-. . 'Lithology 10120 10002 9997 9992 9908 9902 9804 9844 19578 10570 10523 10492 10470 10454 10434 10398 10380 10340 10315 10293 10280 10235 10214 10212 10193 10187 10146 10138 10114 10082 10065 10051 10040 10025 10015 10001 9970 9908 yes no yes yes yes yes yes ves y~ no yes yes yes yes yes yes yes yes yes yes no no yes- yes yes no vas yes no yes yes Sandstone ?~3ndstone Sandstone Sandstone S_hale Snale Shale Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone S~nds~One Shale ~ndstone Sandstone Sandstone Sandstone Sandstone 'Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Sandstone Shale Sb_s] e spar, r j-sun · ~ J, A. Fouch~ President ~. Gary Plisga 3bio-BP, Alaska 3111 C. Street Anchorage, Alaska 99503 Re: ',,'?~/f~ COpk Our BossGyroscopic Survey Job No. Boss-16457 Well R-6 Prudhoe Bay Field North Slope, Alaska Date of Survey: October 11, 1979 Dear Mr. Plisga: Please find enclosed the "Original" and sixteen (16) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you for giving us this opportunity to be of service. Yours very truly, SPERRY-SUN, INC. Ken Broussard District Manager m/aw Enclosures .~3HIO FP P PUP., ~ CE ALASKA ALASKA r' P CDU, C T I CN ) FPEr:'RY-SUN NELL SLI[,;VEYING ANCtiORAG£, ALASKA DIVISION CCFPUTATION DATE CCTOgER 15, 1979 C 0 f'" P/~ N Y DATE OF SURVEY OCTOBER PCSS GYROSCOPIC SURVEY dC8 NUNBER EOSS-16q57 KELLY BUSHING ELEV. = 55.07 FT. C 200 .t 00 f O0 700 1CCO 1100 1200 1300 Ia OO 1500 1EOO 1700 1F O0 1960 2[00 21 (; [1 ~CO 2r-C0 30gU TRUF VEFTICAL FEPTP 1C'0.00 200.00 300.00 ~,O0.O0 ' ~:. CC CC .~ ..,., . ..., (.c~, e,?9.99 11~9,C9 1~99,98 1~9,98 1799,~7 1899.97 ~9.~7 2C~9.97 2~.~6 23~9.81 2499.71 2705.~0 SUF~ -SE A VEPTIC~L D E F T H 144'91 24A.ql 344.91 444.91 5q4.90 644.00 744.00 ~.90 S4~.90 104~.90 12~.9~ ,15~.8~ l~a.8% 17~.8P 19a4.~8 20~4.~8 21q~.e7 22~4 ~7~4.=1~, COURSE COURSE INCLINATION DIRECTION [;ECG ~IN DEGREES 0 ' k O. 0 EL 8 'S 6~+.69 E 7 S =6.65~, W 12 S q7.29 w 19 S 60.60 W 20 S 30.29 W 19 S 2~.50 W 17 S 0.29 k 16. S 23.60 F 15 S 38. 0 E 7 S 46.60 E 13 S 36. 0 E 23 S 46,1.0 E 27 S 49. 0 E 19 S 59.19 E 20 S 29.~0 E 26 S 29.19 F 2(, S 46.39 E' 12. S E2.69 F 16 S 7a,19 W 15 S 86."c.;. W 26 N ~.,E9 F ~ N 81.56 E 20 S 72.19 E ~3 S 6~ .50 E 20 S 63.19 E' 2~. S ~'~4. 0 E ~9 S 26. 0 F 2 S 3~-~. 0 E 1° $ 70.1c E 55 .g 85.69 E DOG-LEG SEVERITY F'EG,/IO0 O.O0 .14 .2~ .07 .1~ .18 .02 .16 .12 .07 .12 .lO .17 .07 .16 .17 .10 .13 .26 .~5 .06 .70 1.~1 ,51 ,~7 1.23 .40 .71 3.20 1.F2 TOTAL RECTANGULAR COORDINATES NORTF/SOUTH EAST/WEST 0,00 0"00 .... · 05 S .11 E · 17 S ,13 E · 35 S .I0 W · 61 S .~8 W 1.00 S .88 W , 1.50 S 1.16 W 2.00 S 1.30 W 2.~7 S 1.21 W 2.86 S .98 W 3.11 S .76 W 3.35 S .56 W 3.75 S .20 W ~.2q S .35 F ~.65 S (~,. .89 E - E,05 S 1.28 E 5,6~ S ~'"~t 1.61 E 6.25 S r'r~ 2,08 E 6.60 S .L~'"~). 2.53 E 6.75 S r~ 2.q7 E 6,83 S'-..~'~'~ 2,02 E la. lq.56 E 13, S 17.60 E 17.~ S 1~.83 E' 21."~'~'~ S 22.a8 E 25.14 S 2g.a~ E 27.10 S 3F,.O0 E VERIlCAL' SECTION O -.C~ -.77 -1.33 -1.89 -2.33 -2.66 -2.71 -2.73 -2.7~ -2.7c -2.7~ -2.65 -2.66 -2.8~ -2.93 -2.87 -3.02 -3.3~ -3.2~ -2.1~ -.~1 1.3~ 2,77 3.00 1,84 ,77 2.a4 7.g0 SCP R-6 PRUDHOE ALASKA ~, L A S K ~ ~ ,~ Y PP, CDL'CT ICk r'? SPERRY-SUN WELL SURVEYING ANCHCRAGE~ ALASKA CO~P'UTATICN DATE OCTOBER 15, 1979 COMPANY ' PAGE 2 DATE OF SURVEY OCTCBER 11, 1379 RCSS GYROSCOPIC SURVEY JOB NUMBER BOSS-16457 KELLY BUSHING.ELEV, = 55.09 FT. MFASLREC DEPTH TRUE SUP_ -SEA VERTICAL VERTICAL C E F TH DE P TH 3100 3200 3300 3400 3500 3600 3700 ZBO0 .3500 4000 4100 · 4200 /+300 4400 4.500.. 4600 4700 4800. ~SO0 5C00 CCURSE ......... CCURSE IKCLIh, ATION DIRECTIOK PEG MIN DEGREES 5100 .... 4882.5.5 5200 4963.01 5300 5043.06 5400 5122.78 5500 52C2.06 5600 52EO.SE. 5700 5800 5437,F. 4 5900 5.r'l 5.77 6GOO ~'553.6. 6160 5671 3098.05 3042,96 3]97.08 3141.9S 3~$5,47 3240,38 3353,04 3337,95 3~69,88 3434,79 3585.77 3530.68 36,80.45 3625.36 3773.8~ 3718,74 36~5.60 3~10.71 . 3956.48 3~01.3~ 25 4045,47 3990.38 28 ~132.16 4077.07 31 4216.97 4161.~8 32 4301.18 4246.09 32 4~E5,!1 ., 4330.02 33 ~4E8.87 441= 78 3= 4552,81 4497,72 32 4636,55 4581,~6 33 4719.65 4664.56 34 ~801.66 '~7~6.57 ~5 4827.50 36 ~907.92 36 4987.97 36 5067.69 37 514~,97 37 5225.90 37 530~.5~ 38 _ . 5382,75 38 5460,68 38 ~=8,~ ~8 5616,2~ 39 9 22 N 60.20 E 11 ....... 26 .......... N .... 38.59 F' 13 45 N 36,59 E 15 3 N 36.50 E 17 52 N 37, 9 E 19 39 N 37.29. E 22 10 N 37. 0 ~ 24 1 .N .~38, 9 E 48 N 38.29 E 26 N 38. 0 E 20 N.3Z.,29 E 37 N 37.29 E 35 k 37.50 E 12 ..... ~.,37.59 E 1 N 37.70 E 48 N 37.70 E 27 .... N~38,20 E ,7 N 38.29 E ~0 N 39.=0.. E 16 ............. k_.39.5~ F 39 N 40.50 E 58 N 41,70 F 17 N 42.50 E 47 N 43, 0 F 58 N 43,A0 E 17_ N 43.20 E 50 N A3, 0 E ~6 N 43. 0 E 57 k 42.70 E 2 N 42.70 E DOG-LEG SEVERITY BEG/lO0 TOTAL RECTAkCULAR COORDINATES VERTICAL NORTF/SOUTH EAST/WEST SECTIOk 1,90 3.67 2.35 1.30 2.81 1.79 2.52 1.90 1.78 21.07 S 61,54 E 28,7/+ 9,27 $ 74,81 E 46,q7 8.04 N 88.0$ E 68.0S 27.98 N i02.98 E 92.71 50.61N .......... i2,P_,_.O~ .... ~ ....... !20.77 76.23 N 139,~9 E 152.63 10q,68 N 161.0~ E 187.9~ 1.~5.78 N ..........18q...,..~? .... ~ 226.87 168,8~ N 211,02 E 268.70 2.63 204.7q N 239.18 E 313.9~ 2.92 244.20 N 269.61 E 363.35 1.29 286,33 N 301,70 E 415.~3 · 11 32~.18 N 33A.A6 E q69.27 · 56 372.28 N 367.59 E 523.16 ,19 415.54 N~ A00.97 E 577.3~ · 22 ~58.5~ ~ q3q.20 E '631.2~ · 71 501,6q ~ ~67.82 E 685.46 .66 ........5A .32rYf_ ........... 7 o.6e · 59 63..12-~;~_~-'~ 575.59 E 656.01 .66 ............. ......... 915.21 · 58 770 · 5~-'~NL~ 693,70 [ 1035,28 · 30 860.~~ 777.,0 E · 07 996~ N 90~.78 E · 09 1088.62 N 990.14 E 1~69.75 SOHIO BP F'RUCPCE ALASKA ALASKA GAY PRODUCTION · SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE, ALASKA ~'l ........................... D A T E 0 F .S. U~.V_E Y O.C.? O.B.. E,R....11, COMPUTATION DATE BOSS GYROSCOPIC SURVEY CCTCDER 15, 1979 1979 deb NUMBER BOSS-16457 .............. K.E.L.Ly ..... BU.S._H ! NG__E.LE..v ·. = 55.!9 F T. ME'XSU [DEPTH RED TRUE VERTICAL PEPTH SUP-SEA COURSE COURSE VERTICAL INCLINATION DIRECTION DEPTH DE'G FIN DEGREES DOG-LEG ~EVERI'TY DEG/iO0 ,TOTAL RECTANGULAR COORDINATES VERTICAL NORTI-/SOUTH EAST/WEST SECTION ~,2o 630 64.0 6.5O 660 670 ,, 7O0 71,0 720 730 740 75O ..... 770 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 57As.is .... SGs4.,iO 5827.42 5772.31 ssos.s7 585o.85 5984,86 5929,77 6064.01 6008,92 614~,.2~ ............... 6088,16 ....... 6222,5~ 6167,44 6~01.55 6246,84 6460,9E, 6405,87 f~AO,E1 6485,52 6620,55 6565,26 6700,51 6645.22 6780.51 6725.42 6861,19 6806,10 .... 6~42.46 6887.37 7800 7024.:~ 656.9.24 !.%.00 ........ 710.6.~: ...... 7051,74 8000 718~.=7. ., 71*A.48 8100 7272,4~ 7217.35 8200 7355.32 7300.23 ................ 8~00 74~8,8~ 75~3,76 8400 7523.22 746f;.13 PSO0 7607.67 7552.58 P600 7691,69 7636.80 e700 7775.98 7720,~9 8PO0 7860,15 7~05.06 .... HSO0 7C~A,P2 7~85,75 9000 803C.49 7975,40 ~20'0 ' 8202.41 8147,52 37 37 ~7 57 52 N 38,59. E ,57 1~Z~o70 N 1275o6~ E 1900,0~ ~7 19 N 37.90 E .A7 1A61.A3 N 1311.27 E 1960.38 $7 22 ........ N_.37o20,,E .~3 15..09,55 N ..... 1~4..8.t.~.5 E .............2020,51 37 15 N 36,40 E °50 1558o06 N 13f14°56 E 2080o49 37 9 N 36, 9 E ,20 1606.8~ N 1420,31 E 2140.23 36 A5 N 35.29 E .43 1704.54 N 1~90.66 E 2259.03 36 3~ N 55, 0 E ,25 17~,~? N 1525o04 E 2517,R~ 35 50 ............ N ~¢.°~0 E , °8i 1¢~.~°9~ N 1558,68 E 2575,95 55 26 N 3~. 0 r .¢7 ............. ~"~.IA 'N ........159'1'-A3''~ .... ~4 ~7 ~ 33.40 E .88 tg"R.?.90 N 1625.29 E 2489.A4 38 21 N 42.20 E .51 1180.63 N 1074.82 E 1594.6~ 3.8 .6 ...... ~ ..... ~..!?~ E ........ .~5 ......... !~._2~.~.,f%...~ ................... !!!6..,.15 ..... ~ ..................... 1656.48 43 N 40.90 E .58 1272.89 N 1156,67 E 1717.79 37 N 40.20 [ .4A 1319.33 N 1196.~0 E 1778,71 33 N 39 20 E 61 13E6,27 N 1235,37 E ....... 1,.839,44 34 12 N 33. 0 E ~ ....... ~ ........... ~--~'~';"7~ E .... .z'~ ........ iq~~"~"-'~ ......... i68~'.'~'-~ ............. ~.6~ 33 55 N 32,40 E .31 ~~0 N 1714.90 E 265~.28 3~ 7 N 32,A0 E °19 ~,~8.~,'"'~A N 1744.88 E 2708.86 32 18 N 41.40 E 1.48 ~"~1~,57 N 1811,31 E 2816,~5 :2 27 k A2,,0 E 32 44 N 45. 0 E .87 ~'~0.70 N 1921.49 E 2977.95 30 26 N 48.~0 E 1,44~ 2395.68 N 2036.92 E 3136.61 50 .... 5! ...... N ~9,90 E .77~ 2~52,86 N 2075,29 E 5t87,2~ ,~,.'HIO BP ALASKA F', - 6 PFUEHCE E'4Y ,~L/~ SK A. F; P. C Dt.iC T I ON SPFPRY-SLN WELL ~'UPVFYING ANCHORAGE,~ ALASKA DIVISION CCFPUTATION DATE CCTCPER 15,' 1979 CONP/~NY ) pAG'E' 4 DATE OF SURVEY OCTOBER 11, BOSS GYROSCOPIC SURVEY dC~ NUMBER BOSS-16457 KELLY BUSHING ELEV, = 55,09 PT, ..... TRUE COURSE .. CO MEASURED VERTICAL INCLINATION DIR [![PTH [' EPTH NIN GE SUH-SEA URSE DOG-LEG VERTICAL ECTION SEVERITY DEPTH DEG GREE° ,~ DEG/IO0 · , ~300 82~!7.54 8232.85 31 0 N 5A.29 E 1.A1 2 9500 460.58 840, ,.49 29 20 .N. 58o O,.E 1.57 2 ~600. 8=47.c~~ .,., 8qq2.86. 28 ~z.. N 60. 9 E 1.12 2,. 9700 8635.5~ 8520.z~5 28 ~7 k 62.79 E 1.31 2 9800 8723,51 ..... 8668,42 ....... 28 1 N, 6.8, ....... 0 .... E ......... 2,59 2 9500 ~812.86 8757.77 25 24 N 76.19 E 4.51 2 10000 8903.46 8848.37 2a 40 N 75.59 E .78 2 10100 899A,53 8939,4A 2~ 6 N 7_6.,.80..E .......... ,75 2 10200 6586,0£ 9030,93 23 31 N 77,80 E ,71 2 10300 9177.~5 9122.90 22 41 N 79.69 E 1.12 2 .... 1.0400 9270.55 9215.46 21 47 bi 79..90 E ........... .89 2 10500 c~6u.2: qz08.16 22 13 N 78.19 E .77 2 10600 c4"~,"E. ~ .. 9400.47 2~., O N 7~,"9~ ~ E 1,26 2 *106.14 ....... 9468,45 .... 9.A13.3~ 23 0 ........~.__7.5,.5~ E ...... ,03 2 *10~e~ 95~6.57 9~81.~8 2~ 0 N 75.59 E .00 2 TOTAL RECTANGULAR COORDINATES VERTICAL NORTF/SOUTH EAST/WEST SECTION HORIZONTAL DISPLACEF'ENT = 3830.10 FEET AT NORTH, ~+5 DEG. 5 5.82 N 2198. z E 3340.05 .553,05...N .............. 22A0...!5 ~ .............. 3388.84... 578.08 N 2281.86 E 3436.06 601.1~ N 232A,23 E 3A82.3~ 620,94 N ................. 2367...~ E ................. 3526,9'~ 634.87 N 2410.08 E 3566,98 G45.17 N 2q5].1'2 E 3603.34 655.03,...N ............2.491,22.F 3638.70 .. 6~.91 N '25S0.61 E ~672.88 671.57 N 2569.09 E 3705,5~ 678,28..N ........ 2606,35...E 3736,68 685.~0 N 2643.14 E 3767.7¢ N 2680.5s E ssoo. 7 7~'1,69 N 27~3.89 E 3830.10 7 MIr~ EAST AT MD : 10688 Tt-E C~LCULATICN FROCECL:RFS aRE DASEE CN THE USE OF THREE DIMENSION4 *LINEAR EXTRAtYDLATION 5. ~"i ! 0 F', - 6. PRUEPCE ALASKA ;x L A El K A P AY PRODUCT I ON SPFpRy-~LFN W~[L" SUFVEYING COMPANY ANCHORAGE, ALASKA CCPPUTATiON' DATE CCTCDER 15, 1979 DATE OF SURVEY OCTOBER JCB NUMBER BOSS-16A57 KELLY BUSHING ELEV. = PAGE 5 55."09 FT. INTERPOL~TEC VALUES FOR E.VEN 1000 FEET OF ~EASL!RED DEPTH TRUE P~E~SUREC VFRTICAt BEPTF CEPTF SUB-SEA TOTAL VERTICA.'L, REC.TAKGULAR .... COORD!.NATFS MD-TVD EEFTP NCRT'F/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 0.00 I 000 o99 · 99 2000 ] 9 ,u. 9 · E~7 3000 2998,65 ~006 3556.48 50 O0 4 ~01 60 O0 ..5,5 =,3.63 7000 6381.A3 8000 71R9.57 9000 E',C30.4.c, 10000 8co~.A6 10688 $536.57 -55,09 0.00 0,00 9~A.90 3.11 S .76 W 19~4,88 6.83 S 2.02 E 29.~3,,5,6 27..10.S .............. 38,00 E 3501.35 168,89 N -211.02 E 4746,57 585.83 N 538.18 E 5.538,54 ].042.36 N 94~,.95 E .... 6326.34 1509.53 N 13A8.25 E 7134.48 1992.34 N 168~.7A E 7975.40 23S9,65 N 2036.92 E 8848.37 2645.17 N 2451.12 E 9481,A8 2702,69 N 2713,8g E THE'-'C'ALCUL~TION PROCEDURES ARE BASED ON THE' 'U§E .... OF 0.00 · 01 .01 · 03 ,02 i....35 .................. 1.._~2 .............................. ~3,52 42,18 198,34 15~,82 ~06.37 208.03 618.57 212.21 810.~3 191,86 969,51 159,08 1096.5~ 127.03 1151,43 54,89 THREE DIMENSIONAL,=-~ADIUS' OF '"'1'1 C~, CURVATURE ME.~HOD' PRUDHOE E. AY ALASKA SPERRY-SUN WELL SURVEYING COMPANY AkCFORAGE, ALASKA F'RCDLCTION DIVISICN BATE OF SURVEY OCTOBER 11, '' coyPuT,ATio~i 'D AT~'E OCTOBER 15, 1979 dOB NUMBER BOSS-16457 KELLy : .55,09 FT. INTERPOLAT.ED VALUES FOR EVE. N .... 1.0.0 ..... FEET OF' S. UB-SEA. BEF. TP'. TRbE Y£ASURED VERTICAL DFPTH DEPTH SU[!-SEa TOTAL .V E R T I .C A L,. F~ E C T A N G U L A R C.O 0 R.D ! N $ CEPTH NORT~t/SOUTH EAST/W TES MD-TVO ............. V E R_T I.C_A.L EST DIFFERENCE CORRECTION 0 0,.00 56 ~':5 · Cc ..., 155 155,05 r 2.95 ;.55.05 $55 ~55.~S ~55 ~55.09 .......... ~.., . .., 655 6~5.0c, 7-r. 7~5.0c ............ ~55 E55. O~ ~55 ~55.09 1055 1055.09 -55,.09 0-00 100,00 200,00 300,00 qO0',O0 500,.,00 600.00 700,00 ~00.00 900,00 1000.00 .11_5.5 ........11~5,05.. 11 1255 1255,C5 12 1355 1355.07 13 1A55 ........ 1455.07 14 1555 1555.09 15 1655 1655.05 16 1755 .... 1.7_5.5,05 ..... 17 0.0,00 00,00 O0,O0 00,00 00,00 00,00 00,00 0,00 ...................... 0,.0 · 01 S .02 E' · 11 S ,20 E · 2A S ......... ,02. E · q8 S .26 W ,78 S .7~ U 1,28 S .................. 1,0q W 1.77 S 1.29 W 2.27 S 1.29 W 2.70 S 1.10 W 3,03 S ,8~ W 3.21 S 3.5~ S .ql W 4.01 S .08 E 4,52 S .67 E ~.83._.S 6.00 S 1.83 E 6.52 S 2.38 E 0 ........... Q..O0 · 00 .00 · 00 .00 ......... · .0.0 .............. .00 · 00 .00 · 00 ,00 .......... .00 ......... .o0 ................................... · 01 .00 · 01 ,00 ,01 .00 · 01 ,00 · 01 .00 ,01 ,00 · 01 .00 .02 f~ .00 · 02 =--I · 02 m ~ ,oo .o3 .0 C__.) .oo _I ...... :- .'.-'-~ ............. . . ~ SPERRY-SUN WELL SURVEYING COMPANY PAGE 7 ANCHORAGE,~ ALASKA ....... S OH,I 0 .... D.F ........ A,,LAS E A PR 0 DU CT I ON DI,V.,!,..SION p.A.,,?E. ...... PE..,..~.URV_,..E._.Y..._O_C_,T,,D..D..E._~ .... !.,,1,, .... 1..9,.:19 .- ........ R,-6 COMPUTATIOD~ DATE PRMEHGE E~AY OCTOBER 15, 1979 JCB NUMBER BOSS-16A57 ............~.L..A S K,,.A INTERPOLATEC VALUES FOR E'VEN 100 FEET OF. SUB-SEA DEPTH TRUE SUB-SEA TOTAL ~.E A S U.R_E.~ .VE.~ .T..! C.A...k ............... ~,..E..R3.._I..q,...A L_..., ............ .......... ~_D,'..T.Y._D_ ...................... .V. ~_.R_T__I C__A_~L ...................... DEPTF gEPTH DEPTH NCRTH/SOUTH EASI'/WEST DIFFERENCE CORRECTION ie55 i955.0~ 1900.00 6.82 s ~.22 E .03 .00 2055 2055.09 2000.00 6.8~ S, 1.87 E .03 .00 ............................. 2..!..5.5 ................... 21.55..,. 0..9.. .................. 210.0 ,.00 2255 2255,09 2200,00 6,58 S A,80 E ,06 ,02 2355 2355,C~ 2300,00 7,85 S 8,68 E ,lA ,08 2655 2655,09 2600,0 2855 2F~55,05 2800,0 2555 2555,09 2500,00 0 0 0 ,00 ,00 ,00 3258 3255,09 3200.00 3360 ~355,09 ~300.OO 3463 3A55,05' 3AO0.O0 3567 3555.0S 3500.00 3673 3655,09 3600,00 29=6., 29:5,05. 2900 3056 3055,09 3000 3157 3155.09 3100 11.85 S 16.fl9 E .34 .09 15.46 S 1R.92 E .~3 .10 19.63 S 21.06 E ~'3';65 S 25 ; ................................................. 18 26,72 S .33,52 E 1,12 ,40 27,28 S 43,92 E 1.66 ,55 23,98 S 55,80 E 2,~3 15.01 S 69.56 E 3,79 .............. ? ~ ~..,_A ..... ~ ......... ~.?.'-~.-.-~ .................... ~' ~5 .............. 20.4~ N 97,36 E 8.~ 42.95 N 11A.25 E 69 ~..0 ~_~ .......... ~.3~...._00.[ ................... ,77 1,36 2,05 3.88 5.23 SC,.~,IO F'P R - 6 PFUDHOE ~"~'~'~"R'~"S'~'N w'~'L"L" SURVEYIN6 COMPANY PACE ANCHORAGE, ALASKA AL ASK ~ ....P..R C DUC T I C N ..O. I V I..S..i..C N ' COMPUTATION DATK BAY OCTOBER 15~ 1979 dOB NUMBER BOSS-16457 A.LA SKA I N T E R P C L A T E O 'V A L U..E,,. .... F..O.R ..... E..Y..E_.K:: ........ ~...0_0. ....... _F..E_.E.? ..... QF ...... ~ u.D.-sE A DE. F T P ........... ME,A S.UR E.D ........................... VE DEPTH 0 TRLE SU~-SE:A TOTAL R. T l C A L ....... V E R II.C A L ..... ~EC_I A N G U L A_B ...... CO 0 RD I.N.A !E S. ............... MD :_T. _V.D ............................... V EPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION ................... 5...7. .7.. 9 ........... 3755 · 09 .... 370 3888 3855.09 380 39~8 3955.09 390 ....................... 4llO,. 4055.09 ~4..00 4226 4155.09 410 0...~0.0. ......................... 9.8...5.8..,~ ..................... 15.6.,,9,.~.,.E ........................... 2.~,.6.? ................................. 6.69 0,00 1~2,02 N 182,02 E 33,19 8,51 0.00 ~68.36 N 210.61 E 43.37 10.18 0.00 2.06..~0N .................. 2~2...~2 ..... E ~%,.88 ................................ ~.&.__5~_ ...... i 0,00 255,31 N 278,07 E 71.76 15,88 4345 4255,09 4200,00 305,7~ N 316,50 E 90,17 18,41 ............................. ~.~.~ ........... 4~55,..0~ .... ~.30.0_..O..G ~56....7.1 N .................. ~.5..5~..6P .... E ...................... !...g_i,O~ i8.85 45~ ~455.0s 4400.00 A08.45 ~ 395.49 E 128.48 19.45 4702 4555,0$ 4500,00 459,70 N 435,10 E 147,62 19,15 ................................. ...... 82..2 ~6.55.,09 ........... ~.6.0.0.,.q0 ........ 5_!1.,.27..N .......__~.7.~40_._ E_ .. .!6~_.13_, ....................... 19,51 4942 ~755,09 4700,00 5065 ~855,09 4800,00 5315 505~,05 5000,00 5440 5155.09 5100,00 ................ 5~67 ........... 52..55.,.0.9 ........... 5.2.0.0,00 569~ 5355,09 5300,00 5822 5455,05 5~00,00 5c~0 ........ 5~,0~ ............ 5500,00 .............. ~.~ _~ ~_~ ..... 564,18 N 5!7,17 E 187,74 20,60 619.58 N 562,73 E 210,80 23,06 6.7_6,..!.~.._.~ ...... ~A_~., ~.0 E ............ ~..~.q~ ...................... ~A .23_ 732.54 N 65~,2~ E 259,~7 24,93 788.72 N 710.34 E 285.53 25,57 ........ 84.5,.38...B .......... Z63,2..1_.~ 312,05 26,52 .... .............. o 27,96 28.30 902.38 N 960.68 N 161~.48 N ......... PAGE" 9 ANCHORAGE,~ ALASKA ' S OH I 0.. B p A L A S K A P R C ID U C T I 0 N. DI V I S I C N D_A, !E ...... g_.F. ........ .S..U_..R..,V.. E_Y.,_..9..C..T_.Q.B,_E..R_. ..... R-6 COMPUTATION IDATE DRUCHCE DAY OCTOBER 15, 1979 d£B NUMBER BOSS-16457 ALASKA ............ . KELLY BUSHING ELEV, = 55,0~. FT, TRUE SUB-SEA TOTAL ........... !~.,E, A....S~..R.,E~. ........................ V,E,R,T_.I C ~ L V E .P,,T,,,!, C.A L ................. R., .E ,. C_ T__A_K G,.__U,.L..,~..R._ .... .C_ . O_ .O . _R. _O I N A T E S DEPTF DEFTF DEFTH INCRTP/SOLTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 6207 5755.09 5700.00 1138.17 N 1035.95 E 6335 5855,09 5800.00 1196,85 N 1089,53 E 6462 ,. '~= = ~ ............................................ ~ ~_~.~_ ,..~.~ ................. ~ ~.0..0., 0.0 ........................... L~_~,.d~. N ..... ~..~.~.i.~__[ 658P 6055.0~ 6000.00 1514.08 N 1191.~6 E A23.98 28,63 452.46 28.A8 480.19 27.73 507.27 27,08 533,65 26,37 671a 6155,09 6100,00 1373,33 N 1241,13 E 559.85 6.~L9,1 ...... 625..5..~_~ ............... 6.~,~.e,~.~ ..................... ~.433.25 N .12895.~,~.'~'i':~_:__. ................ 6966 6355.09 6300.00 1493.51 N 1336.09 E 611.77 7C92 6455,09 6AO0,O0 15.54,47 N 1381,91 E 637.53 7218 6555,05 6500,00 1615.69 N lq26.78 E 663,08 7~41 6655.09 6600.00 1676.95 N. 1471.07 E 688,44 746~ 6755.09 6700.00 1737.91 N 1514,22 E 713.25 7592 6855,09 6800.00 1798,30 N 1556.18 E 737,38 ......................................... 7715 6955,09 6900.00 1857.59 N 1596.46 E 760.42 7e~7 7055.CF 7000.00 i~15.6~ N ................. 7Z_S.-'..~_ ............. 7_i.. ~__5 .. 0 ~ ......... _.7_ i..o 0.0 0 ......... i_ ~ 7 2.6 s ~ 8079 7255.09 7200.00 2029.6A N 8199 7355.09 7300.00 2086,61 N ......... .8.~i.~ .......... 7.4.5.5 _. 0 ~ .............. 7 4 0 0.0 0 ...... 2 i ~ 9.5 9 N 1634.98 E 782,29 1672.07 E 805.25 1708.64 E 82~.00 · 174~,80 E 844,64 1783.28 E 864,19 26,21 ~.A,_.lg .... ? .~.~ ......................... 25.80 25.76 25,55 25.36 24,81 24,13 23.04 21,87 20,97 20,75 --"1 20.63 r'rl~ 19,56 SFEFRY-SUN WELL SURVEYING ANCHCRAGE, ALASKA SOHIO F..'.P ALASKA PF, ODUCTION DI.VI.SION R-6 COMPUTATION DATE PRUDt.iCE ['.AY OCTOBER 15, 1979 COFIPANY DATE OF SURVEY OCTOBER 11, · dOB NUMBER BOSS-16A57 KELLY BUSHING ELEV. = PACE 55,09 FT, INTERFOLATED VALLES FOR EVEK 100 FEET OF SUB-SE.A. CEFTP TEE.IF SUE~-SEA TOTAL HEASURED VEPI'ICAL VERTICAL RECTANGULAR COORDIN/~TES MD,~TV,D DEPTH EiEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE 8.437 7"~55.05 7500.00 2187.69 N 1824.6q E 882.62 8556 7655.05 7600.00 225A.68 k 1867.50 F 901.lfl 8675 7755.05 7700.00 2281.21 N 191.1.99 E 920.07 8793 7£55,09. 7800,00 2326,18 N 1957,79..E 9.$_8,.90 8912. 7955,09 7900,00 2369,26 N 2003.44 E 956,97 9G2~ 80~5,05 8000,00 2409,2~ N 2047,73 E 973,4A ..... 9.1.A~ ................ ~,155,05 ....... 8100,00 2447,.,5 N 2092,68 E 9261 ~255,0~ 8200,00 2q85,05 k 21~0.50 E 1006,5~ .9578 8555,09 8~00,00 2519,61 N 2189,26 E 1023,09 9,9~ 8~55,09 . 8~00,00 2551,~2 N 2257,5~ E ...... 10.~8,61 9608 8555,09 8500,00 2580.0q N 2285.28 E 1055,07 9722 8655,09 8606.00 2605,92 k 2~,80 E 1067,20 .$~.;.5 87.55,0~ 8700,00 26.26.72 k 2582,8~ E 1080,51 9946 8~55,05 8800.00 2659,66 N 2~2~.51 E 1091,6~ 10056 8955,09 8900,00 2650,9R N 2q7~.02 E 1101,69 10166 9055,07 9000,00 2661,06 N 2517,46 E 1111,18 10275 9155,0~ 9100,00 2669,86 k' 2559,67 F 1120,09 10~ 9255,05 9200,00 2677,20 N 2600.26 El 1128,2~ 10~51 5~55.07 9}00,00 2684.72 ~ 265~.88 E 11~6,09 . _ V E P. T I C ~ L .................... CORRECTION 18.43 18.51 18.8~ 18.07 16,~? 16,10 17.05 16.51 15.52 14,A6 1~,15 13,32 11.13 10,05 ~,90 8.18 7.83 - ~,,~, SCHI£ PF ALASKA P-6 PRUDHCE ALASKA PFCCUCTION , SPERRY,SUN 'WELL sURVEYiNG ANCHORAGE~ ALASKA UIVISICK COKpUT'ATION DATE OCTCDER 15, 1979 COMPANY CATE CF PAGE .1 1 SURVEY OCTOBER 11, 1979 .,~,~ dC~ NUMBER BCSS-16657 KELLY BUSHING ELEV, : 55,09 FT. IN TE RPOLA TED TRUE SUE-SEA ME~SUFE~ VERTICAL VERI'ICAL DEPTH DFFTF DEFTF VALUES FOR EVEN 100 TOTAL RECTANGULAR COO NCRTF/SOUTH E lOt, 9c~.., , r'~A~5.0q., ~ . q400.O0. 2694.08 N 10688 9536.57 9~81.~,8 2702,69 N USE (FRCN TFE CALCULATION TFE NEAREST PROCEDURES 20 FOOT NED LINEAR INTERPOL R/~DIUS CF CURVAT FEET OF SUB-SEA DEPTH RDINATES MC-TVD AST/NEST DIFFERENCE 2680,59 E 1144,40 2713.F~9 E 1151.45 AT I ON Ei.E ,T...N,EEN ..................... URE) POINTS VER T!._C...Ak ............................... CORRECTION 8.:31 7.04 ....... P'- / SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: State of Alaska Alaska Oil & Gas 3001 Porcupine Dr. Anchorage, AK 99402 Attn: Mr. H. Hamilton 3111 "C" STRE ANCHORAGE, AL~$K~ ~ TELEPHONE (907) MAIL: POUCH ANCHORAGE. A LASK-A REFERENCE: Well Data Transmission (~'~'he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- R-6 Boss Gyroscopic Directional Survey 916457 10/11/79 2 copies 1 sepia and 1 prin% for the following well: R-6 i 5- FDC Run 1 5" BHCS Run 1 2" & 5" DIL Run 1 2" & 5" CPL Run 1 5" Colette Tracy Well Records 19 SOHIO PETROLEUM COMPANY DJvJsion of Sohi~ Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION October 16, 1979 j c:..'-'xvu~,~"l~ I -~J ~1 G~O[..._ ~ MAIL: POUCH 6-612 Alaska Oil & Gas Conservation Conmission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Well R-6 (32-32-12-13) Enclosed, in duplicate, is Form 10-404, Monthly Report of Dri¥1ing and Workover Operaffions, for the above- named well for the m~nth of October, 1979. Yours very truly, P. R. Judd Dis~'ict Drilling Engineer PRJ: ja Enclosures cc: Well File ~17 Form No. 10-404 . REV. ~-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. WELL WELL OTHER 2. NAME OF OPERATOR ~ohio Petroleum Ccx~pany, a DiVzslon of Sohio Natural Resources Company' 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 4. LOCATION OF WELL At Surface: 729' NSL, 3880' WEL, Sec. 32, T12N, R13E, UPM . $. APl NUMERICAL CODE 50-029-20388 6. LEASE DESIGNATION AND SERIAL NO. ADL 28279 7. IF 1NDIAN'ALOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. R-6 (32-32-12-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 32, T12N, R13E, UPM 12. PERMIT NO. 79-52 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. October, 1979 Cleaned out casing to 10630'. Tested casing to 3000 psi. Displaced well to NaC1, Ran CBL log. Ran 229 jts. 7" 26# L-80 AB-IJ-4S tubing to 9294'. Landed tubing with ball valve nipple at 2018'. Installed and tested tree. Displaced tubing to diesel. Set packer at 9191', tested tubing to 3500 psi. Released rig at 1800 hours, October 4, 1979. 14. I hereby certify~eg~oing is tr~ue and ~,~ect SIGNED TITLE District Drillinq En.c~f. DATE / O/~ ~//7~ NOTE-Report on this' form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION October 3, 1979 3111 "C" STREE~T ANCHORAGE, A L/~-I~/~ ' TELEPHONE (907) MAIL: POUCH ANCHORAGE, ALASFA Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentl~: Well R-6 (42-32-12-13) Enclosed, in duplicate, is Form 10-404, Monthly Report of Drilling and Workover Operations, for the above- named well for the month of September, 1979. PRJ:ja Enclosures cc: Well File #17 Yours very truly, SOHIO PETROLEUM COMPANY District Drilling Engineer Form l~b. !>3-404 R?-V. 3:L70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-.20388 6. LEASE DESIGNATION AND SERIAL NO. ADL 28279 WELL WELL OTHER 2. NAME OF OPERATOR Sohio Petroleum Cc~3any, a Div. of Sohio 8. UNIT FARM OR LEASE NAME Natural Resources CQmpany Prudhoe Bay Unit 3. ADDRESS OF OPERATOR 9. WELL NO. Pouch 6-612, Anchorage, AK 99502 R-6 (_42~32.~12-13) 4. LOCATION OF WELL At Surface: 729' NSL, 3880' WEL, Sec. 32, T12N, R1. 3Er. UPM 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBSECTIYE) Sec, 32 12. PERMIT NO. 79-52 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. September, 1979 Spud well 1300 hours, September 11, 1979. Drilled 17~1/2" hole to 2700"-, Ran 67 jts. 13-3/8" 72% L-80 Buttress casing to 2661~'. Cemented with 3853 cu..ft. Permafrost II cement. Installed and tested BOPE. RIH to 2618'-, tested casing. Drilled to 2727' ran leak-off test. Directionally. dri'lled 12-1/4" hole to 9750''. Ran 250 jts, 9-5/8" 47% L-80 Buttress casing to 9740'. Cemented in two stages: First stage with 1384 cu. ft. Class G cement; second stage through D.V. Packer at 2583' with 130 cu,ft. Permafrost cement, preceded by Arctic Pack. Cleaned out to 9682", tested casing. Drilled out to 9776', ran leak-off test. Directionally drilled 8-1/2" hole to 10688'. Ran open hole logs and sidewall cores. Ran 36 jts. 7" 29% L-.80 Buttress casing to 10681'. Cemented with 336 cu. ft. Class' G cement. Cleaning out casing. 14. lhereby certify th~~tru~d co_.~, District Drillinq Enqinee~ATE MOTE-Report on this' form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and Oas conservation committee by the 15th of the succeeding month,unless otherwise directed. Alaska Oil and Gas Conservation Ccmmission Hoyle H. Hamilton /~~ September 17, 1979 Chairman of the Ccmm~on Commissioner E<bby D. Foster Petroleum Inspector Witness BOPE Test on SOHIO's R-6 Sec.32, TllN, R13E, UM Pezmit #79-52 Thursday, Se~t~ 1,3,. 1979 I departed Anchorage via ~0HIO's flight #1 at 9:45 AM to Prudhoe Bay and arrived at the location at 11:30 AM. Friday, Se~.tember..14,. !979 The BOPE test began at 11:30 AM and was ccmple~ at 7:15 PM. During the test a small pin hole developed in the shock hose between the BOPE stack and the choke manifold. This hose was changed and tested. The results of this test are attached to this report. In summary I witnessed the BOPE test on SOHIO's R-6. '..*"~~ ~.i~~ _-~; -~. ::. :.,~,~ . .~.~;. .c;:_~ '- :2-~-~;-*-'-~'2-~'. ~: : X':~" ' -' - .-:****~-~: ; AlaSka Oil and Gas Conservation. Commission -~}}~:.-' .:'.:~:--.} ~'Field InspeCtion. of Blowout Prevention Equipment .**'-;'.+'." . .- _., . Dril ling Con. tractor~~/~ ~/ze7..~ Location, General "'?"*"'"' -'- -"~'-:"-'"'~ ':': lOX ,~.-_*.-f-;~'t-., Reserve pit -BO PF. S.{: ack Annular Prevente Pipe Rams BIind Rains Choke Line Valves H.C.R. Valve Kill Line Valves , ... Da'te ¢'-' /¢-' 7¢ ; ":' #, ?'¢- /'?~Casing Set @ ft. Check Valve. , . Rig #_/ Rep'resentative~)~? ~O; ~ ACCUMULATO'R SYSTEf. I ~ . FUll Charge Pressure~0~0 psig Pressure .After Closure /~~ psig Full Charge Pressure Attain in:~ min*/~.qec. N2 ~~w~. , ~/~; ~DoO,. ~~0 .osig RemOte Controls O~ ,sig Kelly and Floor ,Sa.fe~;y Valve'~ Upper Ke].ly / Test Pressure 'Lower Kell.y / Test Pressure Ball Type / Test Pressure -' Inside BOP, / Test Pressure "- Choke Hanifold / Test Pressure~O No. Valves // No. flanges Adjustable Chokes ltydrauically operated choke Test ResUlts: Failures / Test Time ~ hrs. - Repair or Replacement of failed equipment to be made within days and Inspector/Commission office notified. Dist vibut ion oeig: - A0&GCC cc' - ' Operi, tor cc - Supervisor August 9, 1979 Re: Prudhoe Bay Un it R-6 Sohio Petroleum Company Permit No. 79-52 Sur. Loc.: 3880'~L, 729'NSL, Sec 32, T12N, R13E, UPM. Bottomhole Loc.: l180'W~L, 3400'NSL, Sec 32, T12N, R13E, UPM. Mr. P. R. Jud~ District Drilling Engineer 'Sohio Petroleum Company Pouch 6~612 Anchorage, Alaska 99502 Dear Mr. Judd: EnclOsed is the approved application for permit to drill the above referenc~ well. Well s~ples, core chefs and a mud log are not required. A direc- tional survey is required. If available, a tape containing the digitized log info~ation on all logs shall be submitted for Copying except experimental logs, velocity surveys and dipmeter surveys. ~any rivers in Alaska and their drainage system, s have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title 5, alaska Administrative Co~e). Prior to commencing operations you may be contacted by the Habitat Coordinator's office, Department of Fish an~ Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Pederal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. Mr. P. R. Judd Prudhoe Bay Unit R-6 --2-- ' August 9, 1979 Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit to drill. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a repre- sentative of the commission may be present to witness testing of blowout preventer equipment before surface casing shoe is drilled. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a withes$ present. Very truly yours, Hoyle H. Hamilton Chairman of BY OR~'~ 07 THE Alaska Oil & Gas Conservation Commission Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o/encl. Department of Labor; Supervisor, Labor Law Compliance Division w/o encl. h~: be SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION August 6, 1979 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 CONFIDENTIAL Alaska Oil and Gas Conservation ~ssion 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Hoyle H. Hamilton Director Well R-6 (42-32-12-13) Enclosed are the following documents: 1. Application for Permit to Drill, in triplicate 2. Proposed Drilling Program Outline e Our check for $100.00 to cover the permit filing fee. . Three copies of surveyor's plat showing well location. Very truly yours, SOHIO PETROLEUM P. R. Judd District Drill'.~ng Engineer PRJ: ja Enclosures cc: Well File #17 Form 10-401 ~ ~ SUBMIT IN TR~ .ATE REV. 1-1-71 (Other instructions on reverse side) la. TYPE OF WORK STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN DRILL r-~ DEEPEN [~ b. TYPE OF WELL OIL GAS WELL ~-] SINGLE MULTIPLE WELL [~] OTHER ZONE ~-~ ZONE [--] 2. NAME OF OPERATOR Sohio Petroleum Company, Div. of Sohio Natural Resources Co. 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, Alaska 99502 4. LOCATION OF WELL At surface . 3880' W]~_,, 729' N.~L, Sec. 32, T12N, R13E, UPM At proposed prod. zone 1180' ~t~, 3400' N%, Sea. 32, T12N, R13E, UPM 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 10 miles NW of Deadhorse APl #50-029-20388 6. LEASE DESIGNATION AND SERIAL NO. ADI, 28279 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. R-6 (42-32-12-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 32, T12N, R13E, UPM 12. 14. BOND INFORMATION: TYPE Blanket Suxetyand/orNo. American Insurance Co. 3348616 Amount $100,000.00 15. DISTANCE FROM PROPOSED * ' - 116. No. OF ACRES IN LEASE LOCATION TO NEAREST ..L_L~U west_ or. 2459 PROPERTY OR LEASE LINE, FT. ~,I~T. QQ2vQ (Also to nearest drig, unit, if any) z~.,.a.~ ,-v t ~, I 18. DISTANCE FROM PROPOSED LOCATION 119.PROPOSED DEPTH TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 3235 ' north ~of Well R-5. I 10759'MD 9457 ' TVD 21. ELEVATIONS (Show whether DF, RT, CR, etc.) KBE = 55' AMSL est. 17. NO,ACRES ASSIGNED TO THIS WELL 160 20. ROTARY OR CABLE TOOLS 22. APPROX. DATE WORK WILL START September 20, 1979 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE MDSETTING DEPT~ Quantity Of cement 36" 30"x20" Insulated Conductor 110' 110' 605 au.ft. Arcticset 17~" 13 3/8" 72# L-80 2590' 2590' 5115 au.ft. Permafrost II 12~" q ~/R" 47:E L-go ' 9775' 8656' 1400 au. ft. CI~.~s G: 130 au.ft. ' ~ , 8%" 7" 29# L-80 10759' 9457' 407 au.ft. Class G ~FC See attached proposed drilling program. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on present productive zone and proposed new productive zone. If prOposal is to drill or deepen dkectionally, give pertinent data on subs'ufface locations and measured and true  vertical depths, Give blowout preventer program. 24. I hereby cerf~fy that~oregoing is True and Correct SIGNED ~:) ~ ~ ~~ll~..,~ ~~~- DATE. TITLE District Drlq. Engineer (This space for State office use) SAMPLES AND CORE CHIPS REQUIRED ~,.NO DIRECTIONAL SURVEY REQUIRED 'RI'YES [] NO CONDITIONS OF APPROVAL, IF ANY: MUD LOG ~N [] YES O OTHER REQUIREMENTS: PERMIT NO. 7 ~ ' ~ ~ APPROVAL DATE /"%'/, *;~~,,..~ Chairman ~' [/ *See Instruction On Reverse Side BY ORD,""R OF THE CO~,~M!SSION A.P.I, NUMERICAL CODE go-- o2-9-7., o3 go° August 9, i979 8/9/ 79 DATE PROPOSED DRII.I.ING AND COMPLETION PROGRAM Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated conductor to surface using Arcticset cement. Drill 17 1/2" hole to 2600' and cement 13 3/8" 72# L-80 Buttress cas'lng to surface using 5115 cu. ft. Arcticset cement. Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer frc~ 13 3/8" casing point to T.D. Directionally drill 12 1/4" hole to 8656'+ TVD. Run 9 5/8" 47# L-80 Buttress casing %o 8656' TVD and cement first stage with 1400 cu. ft. cement. Cement second s~age through D.V. packer collar at 2600'+_ with 130 cu.ft.' Pezmafrost C cement. 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus' will be Arctic Packed. Directionally-drill 8 1/2" hole to T.D. at 9457'~ TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 407 cu.ft. Class G cement with. 18% salt. Run 7" 26# L-80 Atlas Bradford IJ-4S ~bing with. a production packer assembly at 8208'_+ TVD. A subsurface safety valve with dual control' lines' will be · placed at 2000'+. Displace tubing to diesel'. install ~r~ test Xmas tree. Su~nd well for perforat'~mng subsequent to' rig release. .Details of proposed perforations to be submitted on Sundry-Notice to follow. - = 40 ' lO 20-- ', ' 50 40 lO_ = 20. -- - -:: t ' t. .. 04 i_' ' : ' - ~" ~ '' ' 4862' ' ' 50 40 ' -" !~ ' :' -'' :' J T R:~(Proposed) _ ~ .: .-: .-_ !-. ..... co _ . ' ';- . i- J -~?~::-.--~,_ ,-:-:: ~..: F-:-=-::~, .. ...~ ~ '~:--: / - ' ::-:.'-- . ~- ''-':-- { '-,.-- J.- --.'-'---'~- ~' R-Ia: I_.-j.~. ~-':~..-..., :.._. ~ . /L~ _ I' '-"-': j' - = 7~0'44.95" -': ~'-:':':::~,.~'-':"': ~ ,o'~'~J ~: ~'~"4~ ' ': ?.:"-.': --: -; - - (P<~'- IT :- -:-:J: :,' -: - - --' ' ' -.:::-'::.-: .--'-'- 'I -':.'--'' '- "~i, ' %-:-' '~1 ~ -' "'I' :"::'"- "" .--':: -'~:_'~' ~' -- -" - .'" -- ?,:' ; -'' -' ' '- ~:"02 ...... ;"-'-- ' '" ; .... '"-' : '-J- ' "''940' -~R-4 ' '. ' - I~ ..:: -:~-::'>:-:..::', ;--'_ . ~ :_ - ~' _ . . ~(~rop~,~). ':::7 :: -" '~fi?':'-:/.':'"' .... ::'-"..'.::I'~:'.:-::. ~-.: :.'.-:'-??'-." ': :~: "--. ::- ...... ? ':.~-:~-.,~ ~-" ' - ~:;" --.': :-'- - : .... : . '--~ ' . ~-_': :-.:. ':-.- ~: ]: '. .. : - ,: _~ -- : : . ,. _ .'--::7:. - ' -; { - - : -- '- '-J "-; - ~ :.::'.' '~. ~ ~ ~ . _ -~-.':- .:. '~- I' " -t . -.- . . :- _:.:._ . : -.".._PORTION OF T 12_ N, R 13E, UM --' .. SCALE - I"=-I/~ MILE --' . -': .. . -...-_ -... -_ . _ ~ . . '--::."CERTIFICATE OF SURVEYOR' -' .2 ' . '. :. '- : ' _ . _ ..... . --? , . . _ - ! hereby certify thai lam properly registered to'.: . -- practice-lend:surveying in, the State of Alaska-and'that this plot .... --" represents';oiocoiion:su}~eyof the well shown and the wells -thereon. _This ~survey-.wos~mo:Ce by me or under my su rwsion and alt. dimensions and Other details ore correct. Bottom hole loc )ns ore furnished-by others; -~.~ - - ~., - Su r ye y or . NOTE Al bottom holes are 8800' sub sea. - 135' j. 353' PAD DETAIL.'--, SCALE 1" = 400' Located in SW I/4 PROTRACTED SEC. 5Z,T. 12 Surveyed for B.R ALASKA INC. Surveyed by F.M. LINDSEY & ASSOC.: LAND & HYDROGRAPHIC SURVEYORS 2502 West Northern Lights Boulevard Box 4-~81 Anchorage Alaska .'(- 03 04- ' :' :- " . · _.i · c~- ~ ~ '- .. i ~ORT~ON OF T I~ N, R I~ E, UM sCALE I" ' .= ![~ MILE . . .... CERTIFICATE OF SURVEYOR · I hereby certify that I-am properly registered to - land. surveying in the State of Alaska and that this plat representsa Ioca~ion.survey of the wellpad shown (]nd the wells 'thereon. _This ~survey waS;matte by me or under my supervision and_oiL dimensions-and other detai-ls are correct. Bottom hole locations are furnished by others. - Date . . Surveyor t:'i~',.i:.:: .::-~ .. NOTE: Al bottom holes are 8800' subseo. 135' PAD DETAIL SCALE I" = 400' . . _.._=.,~,~,~.~=._ .- .. ..~. ~ ~ ~e ~ '~ ~- .' ' - . . Located in sw i/4 P.ROTI~SCTED SEC- 3Z,T. IZ N_,R. 13£.,UIdIAT MERI.DIA .Nt AK; Surveyed for B.P, ALASKA INC. · i - : .... ..~- ' _:- ,. ---:~-_ - _ ---:.~'~"'~ .... ~- Surveyed by E M. LIN DSEY 8~ ASSOC. LAND ~ HYDROGRAPHIC SURVEYORS 2502 West Northern Lights Boulevard Box 4=081 Anchorooe Alaska PROPOSED DRILLING AND COMPLE~ION PROGRAM Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated conductor to surface using Arcticset cement. Drill 17 1/2" hole to 2600' and cement 13 3/8" 72# L-80 Buttress casing to surface using 5115 cu. ft. Arcticset c~t. Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer frc~ 13 3/8" casing point to T.D. D~rectionally drill 12 1/4" hole to 8656'+_ TV/).· Run 9 5/8" 47# L-80 Buttress casing to 8656' TVD and cement first stage with 1400 cu. ft. cement. Cement second stage through D.V. packer collar at 2600 '+_ with 130. cu. ft.' Pezmafrost C cement. 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Directionally drill 8 1/2" hole to T.D. at 9457'+- TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 407 cu. ft. Class G cement with 18% salt. Run 7" 26# L-80 Atlas Bradford IJ-4S tubing with. a production packer assembly at 8208'+_ TVD. A subsurface safety valve with dual control' lines' will be placed at 2000'_+. Displace tubing to dieseZ. Install ~nd test X~nas tree. Su~i~nd well for perforating subsequent to zig releaSe. Details of proposed perforations to be sutmlitted on Sundry Notice to follow. 3. e e e e 9~ .0. · Is ~a a .............. e.........---.. atmeh~ ' : ...... . · . . . ,.. -- ,..~ . : .','~., .. ....... , Is ~11, ~' s. , ............ , · . . . ',.. Is' ~f~c~ acrea~o ~afl e ~ ~s ~1 ........... dev~t~ ' ' ¢ . . . . Is ~1 ~ ~ · .' -- . , , ~ra~r ~ a ~ ~ force ' . Is a court,on o~ ne~ ' , , administrative approval needed ' .2, Is ................................... 3 Is conductor-string proVided .4. Is enough cenent used to circulate on conductor ar~ surface ..... ' ...~4~ .5. Will cement tie in surface and intermediate or production strings . .'.~a~ .6. Will c~ment cover all known productive horizons ..................... 6~ __ .7..Will surface casing protect fresh w~ter zones ....................... ~ 28. Will all casing give adequate safety in collapse, tension and burst. _9. Does BOPE have sufficient pressure rating - Test to psig . .~ Approval Reccmmended: ~ditional Requir~nents: 'Itch :. 'Approve, (1) .Fee (2) Loc. CA~~ , . (3) Admin. J~'/- (4) Cas9. ~~ (5) BOPE ~ Geology: Engineering:. O ¢ · ~ Well Histo.w File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX.' No special'effort has been made to chronologically organize this category of information. ' '1,1,. ': , ..... 11, 1111, 11,.11, 1,1 11 11 11. 1,1. :11 11 1,,1, 111,111 111111 5555555555 5555555555 55 55 555555 555555 55 55 55 55 55 55 55 55 555555 555555 ' 000000' . 000000 00 00 00 00 00 0000 O0 0000 00 00 00 00 00 00 0000 00 0000 00 O0 O0 O0 O0 0 0 0 0 0 0 000000 777777717'1 77777'77777 1'7 '17 17 77 ?7 7'7 77 7'1 77 "77 7'7 7'7 7.7 :t ~/'.7 !t 7 '1 '77 7:7717 7'777'1 7'1 77 '17 7'1 ! 7 77 7 7 7'1 7 7 '77 '7 '? 77 000000 000000 00 00 00 00 O0 0000 00 0000 0 O 0 0 0 0 00 00 00 0000 00 0000 0 f) 00 00 00 00 0000 0 () 000000 O0 O0 00 O0 0000 O0 0000 00 00 00 O0 O0 O0 0000 00 0000 00 O0 O0 00 00 O 0 0 0 0 0 000000 O~O000:. ~' ...'777'77'17]1"~'7 0000 ()0 17 ? "7 '77 '? 177 0,0 '77 ? 7 '1 '7 77 '77 7 '7 17 7 '7 '? 7 7 '? 7 '1 17 77 '? 777'77'77 '11 ? ?'777'17'1 7 ? 77 77 7'1 77 7 l 7 '7 '77 '1 ? 11 17 000000 000000 00 00 00 00 00 0000 00 0000 00 00 00 O0 O0 00 0000 00 000 O0 0 00 O0 00 000000 000000 M MM M J d dod J A A A d A A d A A d A A d AAAAA d A A ~ A PPPP p p f4 R P P P. R PPPP R P 14 R U U DDL)D U U O D U b D D U U D O U tJ D D U U g D U U U U U I) l,) i) P H H UUU H n U U HHHHH U U H H U 0 H H U O E H H UUU b'l (.J 1~11 'I' riB: LJb~ER PCAL [10707,570'10IT dob ,SwS Kl~l. Ob34 dUb-l'¢. ,,3'1'A14 , hi ~5 l~ R FCAL 5v'~b kblO~.34 tlO70/,57070J dU~ d Lib-"/V. * 6'I'ART* SHIP SkU. u452 6452 DA'fL 25-JAN-80 D A'I' f_. 25-JAl~-80 12:52:49 12:52:49 1I.I111 II,.lllI, ii Il. I1. ii 1,1 ii ii II Iilil, l I, llIli Y.~ YY 000000 000000 11 000000 000000 I 1 00 O0 00 O0 I 11,, 1 00 O0 00 00 1111 00 0000 O0 0000 I. 1 00 0000 00 0000 11 00 00 00 00 00 0 () 11. 00 00 O0 00 O0 0() I 1 0000 O0 0000 00 11 000'0 O0 0000 00 I 1 00 O0 (}0 O0 11 O0 O0 O0 O0 11 000000 OOO000 :1. 1111:1. 000000 000000 111. 111 *START* USI:;R PCAL LlO707,57070J d(Jb SHIP FiL, EI DS~,HlVERI~'t.001<05~>[10/07~5"1070I CREATE:D: PHINTEI): 25-dAN-80 12:53:0~ OOEUE St~I. TCHE~: /PILE:~UR'I' /CUPIES:I /~FACi~G:I /LiMIT:S9 /~'URMS:NURSAL 6452 DAT~ 25-dAN-80 ,25-dAN-80 12:51:25 12:52:49 S C ~ b U ¢1B IL; t4 g g P, C t'J Iq. P LIT I. N G C ~-; N 'IL' El k i 070 I, 57070 F: E; E h H 1:.: A D.E R DAT~: 80/ 1/25 T A t-:' g H E A D g R I,E;NG'TH: 1,32 B~TES TAP'E NAIV!E: 570'70 DATE: 801 1t25 SE:.RVI. Ct~ .N,AIqE: EDIT TAPE C£]NTI,NUA"I.'~ION ,Ntl~¥1BER: 01, .PRE:VIUU& TAPE Ng. lvjg: C[:]g[~)E.,~,~'rS: U.NI..OUE ~EI.,I.., 1DE.NTIE'ICATION NBNBBR 18 50-02~-20388 'r h P ~; C [].rq N g i:x~ T S CSG 9,625" $ 9"12'7~ wEIGBT 40.00 BB/F / ~BUID XC PUB~t,R / DENS 10.1 i0.10 / rISC 42.00 SEC / P~ 10.50 / R~ 2.13 ~ 7B I,)E' / RgC 3,20 (~ 78 DF / BHT 189 D~' NANE: EDI'I' .001 ~4AXlt~ulv'~ P,H~$1CAL, RLCo~D L~;NGTH: 1024 buGS . WEJ[,I~ al I'B INP[.jlqgA'I'itjtu F, ECORD CLI~v~PAN ~: v~'gLh: 1- lk, bb: RANG}',: SE.:C I'1 [iN: 177 tS ~'I'E$ SUH10 PP.'I'ROb~UN CUNPAN~ ~RUDHt)E BA~ ]2N 32 N . .., I" TM 0 SIZE 1 66 D A T U .~'i ~S P ECI i~ 1 C A T 1 (] F~ B b (JC K ~ ~ 1 C T (J (J £, SV'URDt~ UN.ITS at~>1 AP.I .~PI. APl FILE;~ 51.2,~.; L. XI:' PRtiC SA..[vl REP D.tgPT SHIt'~I' O H M ~ GAP 1. GAPI I ~ G .t C: 3 P U G/C 3 C/C CPS 0 0 0 0 0 4 0 0 1 6 8 0 0 '? 1 0 0 0 .q 0 0 1 6 8 0 0 7 1 2 4 b 0 0 4 0 0 ' 1 b 8 0 0 7 1 2 4 4 0 0 4 0 0 1 O 8 0 0 3 :2 2 8 0 0 .4 0 0 1, 6 8 0 0 '7 31 3 2 0 0 4 0 0 1, 0 8 0 0 7 5 2 3 2 O 0 4 0 0 1 6 8 0 0 4 2 3 1 3 2 0 0 4 0 0 1 6 8 0 0 ,4 2 2 8 1 0 0 4 0 0 I 6 8 0 0 ~ 2 4.4 0 0 0 4 0 0 1 b 8 (.) 0 4 2 O 8 2 0 0 4 0 0 1 6 8 0 0 4 2 3 5 .1 0 0 4 0 0 1 6 8 0 0 4 2 ,4 2 1. 0 0 4 0 0 1 b 8 0 0 42 34 92 0 0 4 0 0 1 OB 0 0 42 34 93 0 0 4. 0 0 I ~ 8 0 0 ) D E; P T H 10690. 000 10600 . 000 10500 . 000 10400.0O0 10300 . 000 10200 . 000 10100.000 IO000.000 9900. 000 9800. 000 9700.000 .E M (.1N i C GR GR D }; fi (J NCf4L GR GR DEB[) NC N ,iL., GP NCNL SP D R fi N C N b 8P SP GR DRHL) NCNI-, ,BP GR DHHO NCNI, G~ NCi\~L GE loRHU r~C NI,, 'V ,A b U E - 1, 5. 000 171. 000 0.1,32 2258.000 -10.250 :17,4.500 0.05'7 2780.000 - 8 '7.000 1'72. 750 0. 059 3:14,4.00 (,) -'75.875 1. 1 :I. 250 0. 077 ,3,308.000 -68.250 108.813 0.0'71 375:2 · 00 () - 72.06.3 11,0.875 0.024 4,48,4 . 000 -7 3.000 1. 20. 000 0.0:23 3076.000 -55.500 128.750 -0.005 3144.000 -56. O00 1 35. 000 0.031 32t>8.()00 -14.1.5b 17t.315 0.091 1826.000 53.750 149.500 -999.250 -999.250 i~l ,N EMO,N1C I L D DT N P t't I 1 L D N PH 1., f C N.h 1 L D DT N P }'t I. i,'C NL I, LD D T NPH1 ~CNL I. LD DT 1 L IL) D T f'CNL 1.1~ D lot NPHI ~' C N L ].LD DT NPHI f C n b l. bD UT ILD DT f'CNb 1 DT NPhi fCNL V A L IL} g 4.180 74.750 18.945 938.000 12.102 '71.000 12.891 1269.000 4.133 74.1,88 12.1,58 1525.000 1.886 88.56.3 18.848 1331.000 2.9,38 78.1.88 15.5:2 '7 1 6.34. 000 16.922 69.750 8..~96 2666.000 13.445 95.1.88 21.~31 1262.0OO 0.Stol 8.3. 188 1 '?. 383 1.310.000 16.922 84.375 18.799 1285.000 1.557 1 Or>. 188 2O. 068 6%2.500 7.887 68.000 -99925.000 -999.250 MN~iMON lC i b M GR 1 ,BM F, fl O ,0 1 LM 1, L M G,R I6~ GR RflOB i LM Rkit.)g i bM GR .t L M GH 1 LM RI-il.ID IBM V A L O E 3.850 1,29.875 1.915 10.195 1,08.438 2.O91 4.566 113.938 2.~15 2.02.3 45.281, 2. 375 3.102 43.375 2.361, 17.781 4'7.125 2.432 10.453 55.031 2. 209 0. 695 40. 906 2.~34 12.b16 74.563 2.387 1.451 114.438 2.391 2000.000 -999.250 -999.250 M l~ ~ M O N 1 C hb8U CALl NRAT 668U CA61 NRAT ,,bb8O Ct;hi NRA"I' bhSU CALl NRAT bb8U CALl, NRAT bL8U CALl NRAT bLSO CALl NRA1' bb8U CALl NRAT bb8U CALl NRAT bbSO CAUl NRA'£ bb80 CALl. NRA'i' VALUE 4.758 7.574 2. 209 17.094 9.195 1.930 12.11,? 8.820 I .851 4.719 U..36 't 2.264 "l.OSO 8.0.39 2.012 52.'181 8.391 1.569 14.531 8.203 2.438 5.949 U.391 2.1~4 18.2,19 2.287 2.105 15.594 2.6Lq 1.qb7 -999.250 -999.250 0 E; F 9650 o 000 r~i {:~, k M 0 N I C (;I4 D ,F~ ~ (,,~ N C: N JL.~ ¥ A L U t~4 txl t~ M O N 1 C V A i,~ U E; 8 .,,~. 250 1, b,D 7.848 I 54. :125 DT 55. 375 -999.25(,) NPHI -,99925.000 ,,-999,250 [":C N iJ -999.2,50 1 GR V A L, U E 2000. 000 -999. 250 -999. 1250 C A1"i NRAT VAL, Ut~ 1..591, -999. 250 -999.250 1.024 B~TES TAPE T'~AibE~ .1:.., [5 t.xl G T ,~'t: 132 B 'i T k;,..5 '1" A.P E t~ A 1:'4 E: 5 ? '070 [) A T E; 80 / I / 25 SEIxV ICE ,¢~AM~: EDIT 'rAPE C[llIiTINUATIUI',i i',IUMBE~: 0f J'~EX,'.[' 'i'A[-:'E; IXtAIVlE: Cl:.Jg~v~l~.:i'q'I',5: ll.tul£./LIl{, ~tk;bh i£)E.I",ITii:ICA'I'ION hlUI'4~ER IS 50-(.)29-20.Jt::t8 11 000000 7777777777 000000 11 000000 777777'7777 000000 1111 00 O0 77 O0 O0 1111 O0 O0 77 00 O0 11 O0 0000 77 00 0000 11 O0 0000 77 O0 0000 11 O0 O0 O0 77 O0 O0 O0 11 O0 O0 O0 77 O0 O0 O0 11 0000 O0 77 0000 O0 11 0000 O0 77 0000 O0 11 O0 O0 77 O0 00 11 O0 O0 77 O0 O0 111111 000000 77 000000 11~Ill 000000 77 000000 7777777777' 7777777777 77 77 77 77 77 77 77 7'7 77 77 '77 ~66666 000000 333333 5555555555 66~666 000000 ~33]~.~ 5555555555 66 O0 O0 ]3 ~3 55 66 00 O0 33 133 55 66 00 0000 ,~3 555555 66 O0 0000 ~,~ 555555 66666666 00 O0 00 33 55 66666666 00 O0 O0 ,~3 55 66 66 0000 O0 ]] 55 66 66 0000 O0 '~3 55 66 66 00 00 313 ]3 55 55 66 66 00 O0 33 .~.3 55 55 666666 000000 3333~3 555555 666666 000000 3,331333 555555 222222 222222 22 22 22 22 22 22 22 22 22 22 22 22 2222222222 22122222222 *START* USER PCAL [I0707,603521 dOB SH1P 8Et~. 1507 DATE 14-APR-80 11:03:49 M O N I T O R S W S K L 1. 0 E 34 d' U b-'79 . * 8 T A R T * *START* [;tSER PCAL [10707,60352] d[JB SHIP SEO. 1507 DATE 14-APR-80 11:0,3:49 ONI. TOR Stt~'S l(LIOE34 dUI..,'79. *STA. RT.* / // ?/ / SSSS$SSS SSSSSSSS SS SS SS SSSSSS SSSSSS $8 85 SSSSSSSS SSSSSSSS I I II II II II Ii II II I, I II II Ii I I II I I I I 11 i i PPPPPPPP PPPPPPPP PP PP PP PP PP PP PP PP PPPPPPPP PPPPPPPP PP PP PP PP PP PP TTTT TTTT *START* USER PCAL [1070'7,603523 dOB SHIP SEQ. 1507 DATE 14-APR-80 NONIT(JR SWS KL10E34 JilL-79. ,START* FI6E: DSKH:SHIP T0<255>[10707 60352] CREATED: 14-APR-80 10:23:29 PRiNI'E~: 14-APR-80 1{:04:06 OUEUEi S~iTCHE8: /~IbE:FORT /COPiES:I /SPACING:I /6.INI'Y:127 /FORMS:NORMAL 1.1:03:49 SHIPPING iNSTRUCTiONS ISSUED 14-APR-80 1.0:23 SHIP T(] : VENTURA, CALIFDRNiA 9300.~ PCCC bY GHB PCCC / ¥¥ V¥ ¥¥ YV ¥¥ VV YV ¥¥ ¥¥ ¥¥ V V V V V V V V VV VV' .4) V V EEEEEEEEEE R~,RRRRRR V V EEEEEEEEEE RRRRRRRR V 'V EE RR RR V'V EE RR RR V V EE ~R RR VV EE RR RR V V EEEEEEEE RR RRRRR.~ V V EEEEEEEE RRRRRRRR V V E E R R R,R V V EE RB RR E E R R R R E E R g R R EEEEEEEEEE RR RR EEEEEEEEEE RR RR 11111 i 111111 II ii Ii II I.I II i1 I.I II II IiIIIi Y¥ YY YY 000000 000000 222222 000000 000000 222222 O0 O0 O0 O0 22 22 00 O0 O0 O0 22 22 O0 0000 00 0000 2'2 O0 0000 O0 0000 22 0 0 00 0 0 0 0 0 0 00 22 O0 O0 O0 O0 O0 O0 22 0000 O0 0000 O0 22 0000 O0 0000 O0 22 O0 O0 O0 O0 22 O0 O0 00 00 22 000000 000000 2222222222 000000 000000 2222222222 *START* USER PCAb [10707,60352] dUB SHiP SEQ. Mf3NII'OR SWS KLlOE34 dUI,'79. *START* FILE: DSKH:VERiEY.O02<057>[10707 bO352J CREATED: PRINTED: 14-APR-80 QUEUE SWITCHES: /B'ILE:FORT /CDPIES:I /SPACiNG:I /LIMiT:127 /~'ORNS:NURMAL 507 DATE 14-APR-80 14-APR-80 11:02:26 11:03:49 SCHLUMBERGER COMPUTING CE,NTEE !0707,6(:) 1352 REEL IiEADER LENGTH: 132 B~TES RE[{:L NAME: P.C.A.L. SERVICE NAME: EDIT REEl, CONTiNUATiON NUMBER: O1 PREVIOUS REEL NAHE: COMMENTS: LIS FORHAT CUSTOMER TAPE TAPE HEADER L E N G T H: 1:32 13 ':~ T g S "tAPE NANE: 60352 SERVICE; NAME: EDiT '.['APE CONTINUATION ,NUMBER: O1 PREVIU[J8 TAPE NAME: COMMENTS: DATE:: 801 4/14 [)ATE: 80/ 4/1,4 E {] t' F'ILE HEADER LENGTH: 62 B~'f:gS FILE NAME: EDIT .001 MAXi~IUM PHYSICAL RECURD ,LENGTH: PRKVIOUS ~'ILE NAME: ~'ILE COMMENTS PASS UNE. 1024 BYTES WELL SiTE 1N[-'URMATiON RECORD LENG'~H: CUMPANZ: WELL: FIELD: RANGE: T(IWN: SECTION: COUNT ~': STATE: 177 BYTES SOHIO ALASKA PETRO. CO. PRUDE.gE BAY 13E 12N 32 N. ALASKA i.. A~I.A E'ORMA ~1:." E(,. IFICATiO.N L E N G T 1~,~: ,4 5 0 B Y T E S E N T R .~ $ L O C ]K S: 0 SIZE REP CODE ,ENTRY 1 66 0 DATUM SPECIFICATION ,F315OCK81 ENTRY lC T,OUL SVOIqD~ UNITS AP1 API API API, F'IhE~ SIZE EXP PROC SAr~1 REP DEPT SHIFT F T 0 0 0 0 0 4 0 0 1, 68 0 GAP,I, 51 31 32 0 0 4 0 0 1, b8 0 G A P I 51 31 32 0 0 4 0 0 1 6 $ 0 CU 51, 40 1. 0 0 4 0 0 1 68 0 CU 51 40 2 0 0 4, 0 0 1 68 0 CPS 51 :/t9 99 0 0 4 0 0 1 fl8 0 CPS 51 39 99 0 0 4 0 0 1 68 0 CPS 51 1:19 99 0 0 4 0 0 1 68 0 CPS 51 39 99 0 0 4 0 0 '1, 68 0 C/C 51 42 0 0 0 4 0 , 0 1 68 0 51 43 0 0 0 4 0 0 1 68 0 0 0 0 0 0 0 0 0 0 0 0 DLPT~ 10620;000 1. O600,000 105O0,000 1040(]),000 1, O 300 . 000 1,0200,000 1O100,000 1O000,000 9900,000 9800.000 9710.000 MN EMON lC GR TNBK TRAT GR TNBK TRAT GR TNBK TRAT GR TNBK TRAT GR T N B K TRAT GR T iq B TRAT GR TNBK TRAT GR TNBK TRAT GR TNBK TRAT GR TRAT GR TNBK TRAT VALUE 100.025 500 0~0 0:9-9 6:1.675 180.000 3.246 56.850 135.250 2.784 12. 600 14 '7.750 2.664 1,4:.850 173.375 2.438 11.575 204.625 1.899 1.9.9'75 199. 500 2.657 3 975 2 :ooo 4.141 40.725 293.375 3.1.74 78.050 270.125 4.972 100.050 500.000 0.999 MN EMONiC GRBU "rFBK T M O D GRBU TFBK T M 0 O GRBU TFBK T:MOD GR,BU TMOD GRBU TFBK TMUD GRBU TFBK T M O D GRBU TFBK T M O,D GR'BU TFBK TMOD GRBU TFBK TMOD GRBU IFBK TMOD GRBU I:P'BK TMOD V AL UE 500.0OO 20O.O5O 3.999 59.441 38.700 0.9'76 55.694 16.400 1.730 12.238 1 ]. 800 1.730 1.4.735 17.900 1.730 11.364 22.900 1.730 1.9.855 22.200 1.731 .967 .100 1.730 41.209 46.300 1.000 78.796 41.450 1,000 5OO.O0O 200.050 ].999 MNEM[]N IC $IGM T N G 51 G M TNG 8IGM TNG 5IGM TNG 51 G M 'TNG $ ,I GM TNG $ IGM TNG $IGM TNG $IGM TNG $1GM TNG SIGM TNG VALUE 0.015 1000.000 33.455 250.062 21.'734 146.1,40 1.9.680 2,35.573 16.233 316.013 14.029 386.210 19.575 151.137 24.567 177.61'7 22.273 798.151 38.431 295.528 0.030 1000.000 MNEMON 1. C F$IG TFG F$IG TFG FSIG TFG FSiG TFG FSiG TFG F'8 ,I G TFG F$IG TFG FS,I G TFG FSIG TFG FSIG TFG FSIG TFG VALUE 0.01,5 499.875 28.988 ~1.439 19.21,0 53.447 10.151 50.325 15.236 73.551 12.05'7 153.°721 1~.496 54.945 20.230 48.'701 19.150 1'10.205 40.085 38.961 0.015 499.875 S[.IgMAR¥ OF" DATA RECORDS .NUMBE.R'OF RECORDS: 80 I,ENGTH [JF RECORDS: 1018 BYTES I.,ENGTH O~' LAST RECORD: 182 BY'rES [" iLE TRA ILE}~ L,I.;N G'.I' H; 62 [~" l I.,E NANE: El) .IL T .O0f MAXIHUM Pld¥31CAL .REC[J.HI) LENGTH NEXT ~ILE NAI4E: 1024 B~TES HEADER I,, E N G T.B: 62 B Y T E S F .'[ LF, NANE: EDIT .002 MAXI. MUM PHYSICAL RECORD LENGTH: PREVIOUS FII.,E NAME: FILE CO~q~ENTS PASS TWO AND PASS THREE. 1024 BYTES SiTE 1NFURMATION RECORD [, E N G T H: CUMPAN¥: W E L L: ~ IELD: RANGE: TOWN: SECTI UN: CtlUNT~: STATE: 1.77 BYTES SOHIO AbASK. A PETRU. CO. PRUDHUE BA~ 13E 12N 32 N. SLOPE ALASKA LAI?,A FtlR~qAT SPECiFICATiUN LENGTH: 850 BYTES ENTRY BLOCKS: I:' Y PE 0 S i Z E 1 REP C 0 D E E 1'4 '1' R Y 0 D A T U M 1 2 4 5 6 7 8 9 10 11, 1,2 13 14 1,,5 1,6 17 19 20 21, S P E C I F' 1 C A T 1 (] N I, C T 0 U b 8 V II R D # UNITS ,AP1 AP1 AP1 APl F T 0 0 0 0 GAP1 51, 31. 32 0 G A P I 51 31. 132 0 CU 51 40 1 0 C U 51 40 2 0 CPS 51 39 99 0 CPS 51 ,39 99 0 CPS 5 '1 39 99 0 CPS 51 39 99 0 C/C 51 42 0 0 51 43 0 0 GAPI 51 31 32 0 GAP i 51 131 32 0 CU 51 40 I 0 C U 51 40 2 0 CPS 51 ~9 99 0 CPS 5i 39 99 0 CPS 51 39 99 0 CPS 51 39 99 0 C/C 51 42 0 0 51, 43 0 0 FILE~ SIZE EXP PROC SAM REP DEPT 0 4 0 0 1 68 0 0 4 0 0 1 08 0 0 4 0 0 l,, 68 0 0 4 0 0 1 68 0 0 4 0 0 1 68 0 0 4 0 0 1 68 0 0 4 0 0 1 68 0 0 4 0 0 1, 68 0 0 ,4 0 0 I 68 0 0 4 0 0 1 68 0 0 4 0 0 I 68 0 0 4 0 0 1 68 0 0 4 0 0 1. 68 0 0 4 0 0 1, 68 0 0 4 0 0 1 68 0 0 4 0 0 1 68 0 0 4 0 0 I 68 0 0 4 0 0 1 68 0 0 4 0 0 1. 68 0 0 4 O' 0 1 68 0 0 4 0 0 1 68 0 SHIFT 0 0 ,0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 DEPTH ~t0620; 000 1O600.000 ,tO500. 000 O400. 000 10'3'00,000 1O200.000 10100.000 10O00.000 9900.000 EMONiC GR TNBK T R A T 6iGM TN G TRAT 8 TN G GR TNBK TRAT TNG GR T R A T $I GN T N G GR TNBE TRAT $iGM TNG GR TNBK TRAT SIGN TNG GR TRAT SIGN TNG GR TNBK TRAT SIGM TNG GR TRAT SIGM TNG 'VALUE 0. 000 499.625 1.001 0.015 1000.000 61.825 260.000 3,322 ,42,268 794.654 57 25 2 s: oo 3.05,4 21.284 166.125 18.025 238,500 2,614 19,276 293.030 18.350 236.250 2,41,2 18.001 335,998 14.050 250.500 1.872 13.760 358,981 23.750 269.000 2.720 19.635 200.100 46.025 277.000 3.797 23,682 264.801 43.275 364.250 3.141. 22.498 909.068 MN E M O N i C, GRBO TFBK T M [) D [.;"S I G T F G GRBU TFBK TMOD FSIG TFG GR,B O T'P'BK TNOD FSIG TFG GRBU TFBK TMOD FSIG TFG GRBU TFSK TMOD FSIG TFG GRBU TNOD ~SIG TP"G GRBU 'IFBK TMOD F~IG TFG GRBU TMOD fSIG TFG GRBU TFBK THUD FSIG TF G V A b [J Pi O. 125 200.0O0 3.998 0. () 15 499.8'75 69.680 39.100 0,998 35.826 1,64.585 61.8 ! 3 23,050 1,730 18.3 '70 41.833 16,484 22,100 1.730 16,211 68,057 18.232 23.250 I. 7:30 1. 3. 842 81.668 13.611 30.600 1.730 10.737 107.767 26.474 27.600 1.731 16.961 55.320 44,705 44.250 1.730 20.350 54,O71 50,200 53.900 1.155 18.940 172,702 MN EMI.iN lC SIGN TNG GR T,NB~ TRAT SIGN TNG GR TNBR TRAT SIGN TNG GR TNBK T R A T SIGM TNG GR TNB~ TR.AT SIGN TNG GR TNB5 TRAT SiGH TNG GR TRAT SIGN I'NG GR TNBK TRAT $1GM TNG GR TNB~ TRAT S1GM TNG GR TNBK TRAT VALUE 0.090 999.500 100,050 500.125 0.999 30.667 240.5'70 65,900 345.625 3,417 20.1.75 112,166 03,825 300.625 2.924 19.096 288.0,34 19.425 301,625 2.382 15.738 244.06"1 21.475 312,500 2,339 13.610 387.959 14.150 .308.000 1.907 19.680 198.101 33.125 320.000 2.563 23.128 209.593 35.425 325.375 3.742 22.363 2.748 47.~50 401.000 3.149 MNEMUN IC F'SIG TFG GRBU TFBK FSIG TFG GRBU TMOD FSiG TFG GRBU T F B g TMOD F$IG TFG GRBU TF'BK TMOD ,FSIG TFG GRBO TFBK TM(JO P"SiG 'rFG GRBU TFBK TMOD FSiG TFG GRBU TF8~ TMUD FSIG TFG GRBU TFBK TMOD FSIG TFG GRBU TFBK TM£)D VALUE 0,015 499.001 500.000 200.050 3.999 26.228 29,471 65.684 52,200 0,576 19.750 25,599 62,937 29.100 1.7,30 15,836 58,94:1 19.356 28,500 1,730 14.876 59.441 21.603 29.500 1.730 11.892 121.,254 13.986 33.100 1.730 1'7,681 51.692 34.091 34.600 1.730 20.050 ~9.825 39.080 51.400 1.730 1~.760 1'/9.570 50.574 61.400 1.000 D E P T H '9800 ;000 971. 0. 000 MN ~ON lC GR 'I'NB,K TRAT SIGM TNG GR TRAT SIGM TNG VAL 83 316 5 3 8 333 100 500 0 0 1.000 U E .3 .7 .1 .5 .9 .0 .I .9 .0 .0 0 O 5O 81 36 99 5O 25 99 15 00 MN EMONIC GRBU TFBK T M (] D 6'iSIG T F G GRBU TFBK TMOD TFG V AL U 85. 46. 1. ,40. 51. 500. 200. 4. () . 499. 1,6 95 00 07 82 O0 05 00 O0 87 MNEMONIC S IGM TNG GR TRAT 8IGM TNG GR TNBK TRAT V A b U E 40.005 269.548 81.100 377.000 4.984 0.015 1000.000 1,00.050 500.125 0.99'7 MNEMON lC FSiG TFG GRBO TFBK TMOD FSIG TFG ;,. GRBU .TFBK TMOD V A,b U B 42.109 41.708 81.044 52.b50 1.000 0.000 499.8'15 500.000 200.050 4.000 SUMMAI~ OP' ,DATA RECORDS NUMBER 'OF RECORDS: 1,52 ~1" I,,,ENGIH OF LAST i-~E:CORD: 762 [;' I, I- E', T R A 1 L, E R I,,ENGT,H: 62 BYTES FILE NAME: ED,iT .002 ~IAXI. IV~UM PHYSICAL RECORD LENGTH: .NEXT FILE NAME: 024 BYTES F lI,,,g ,BgADER L`ENG'I'}~: 62 5~TES FILg NA.~E: gDIT MAXIMU,N PHYSICAL R PREVIOUS FILE NAME Flbg COMMENTS PASS 4 AND PASS 5. , , ,. , , , , ., ,. , ,1024 BYTES WELL SITg INFURMATION RECORD L E N G T H: CI'IMPA N Y: WELL,: ["; IBLD: RANGE.,: TOWN: SECTION: CtIUNT ~': STAT[::,: 177 BYTES SOHIO AL,ASKA PETRO. CO. PRLIDH,OE 1BE 12N 32 N. SL.OP~ AbASKA r/ ¸O DATt FORMAT SPECiFICA, T1ON [, EN G TH :' 8 5 0 B'~[ T E S 0 SIZE REP COD~~. ENTRY I 66 0 DA'I'U M 8PECIF ICATI(]N BN TRY i C T.O O L $'VORD# UNITS AP1 API AP1 API Fi,hE# 61ZE EXP PROC SAInt ,REP DEPT FT 0 0 0 0 0 4 0 0 I 68 0 0 G A P I 51 31 32 0 0 4 0 0 1 68 0 0 GAPI 51 31, 32 0 0 4 0 0 1 68 0 0 C U 51 40 1 0 0 4 0 0 1 b 8 0 0 C U 51 40 2 0 0 4 0 0 I 68 0 0 CPS 51. 39 99 0 0 4 0 0 1 68 0 0 CPS 51. 39 99 0 0 4 0 0 1 68 0 0 CPS 51. 39 99 0 0 4 0 0 1 68 0 0 (]PS 51 39 99 0 0 4 0 0 1, 68 0 0 CIC 51 42 0 0 0 4 0 0 1 68 0 0 5 1, ,4 3 0 0 0 4 0 0 1 b 8 0 0 GAPI 51 31 32 0 0 4 0 0 1 68 0 0 G A P I, 51 131 :32 0 0 4 0 0 I 68 0 0 C U 51 40 1 0 0 4 0 0 1 68 0 0 CU 51 40 2 0 0 4 0 0 I 68 0 0 CPS 51, 39 99 0 0 4 0 0 1 68 0 0 CPS 5'1 39 99 0 0 ~ 0 0 1 b8 0 0 PS 51 39 99 0 0 4 0 0 1 68 0 0 PS 51 39 99 0 0 4 0 0 1 68 0 0 C/C 51 42 0 0 0 4 0 0 i 68 0 0 51 43 0 0 0 4 0 0 1 ~8 0 0 D k P T 1 '0 6 2 0 ,' 0 0 0 10600. 000 1 O500. 000 10400. 000 1, O 300 . 000 10200. 000 10100.000 10000.000 9000.000 GR T R h T S IGM T N G GR TN,BK TRAT SIGN TNG GR TRAT SIGN TNG GR T,NBK TRAT SI. GM TNG GR TNBK TRAT SiGM TMG GR TNB~ TRAT SiGM TNG GR TRAT SIGM TNG GR TNBK TRAT SIGM TNG GR TNBM TkAT SIGM TNG VALUE 100.025 500.125 0.99'7 0.015 I000.000 62.975 3'71. 625 3.366 41.819 6'79.990 68.450 309 50 1,9.845 14: 5. ,391 22.825 316.250 2.612 17.597 242.318 20.600 326.750 2.640 16.383 306.520 18.725 338.250 1.765 13.250 305.521 32.975 328.500 2.580 19.845 218.336 47.750 343.125 3.825 23.607 220.834 52.250 410.500 3.060 22.768 210.092 MN EM[,] N IC GRBU TFBK TM(3D P'SIG TFG GRBU TFBK TMt~D fSIG TFG GRBU TFBK TMOD TFG GRBU TFBK TMOD ~'$IG TFG GRBU TFBK T M £) D TFG GR B U TFBK T M O D kSIG TFG GRBU TMUD FSIG TFG GRBU TFBK TMUD P'SIG TFG GRBU T?'BK TMOD ~SIG TFG VALUE 500. 000 200. 050 4.000 0.000 499.875 62.313 55.300 0. 942 38.015 1, 20. 005 67.308 32.150 1,.730 17.756 43.581. 23.976 29.400 1.730 15.521 4,4.,331, 20.355 31.700 1.730 15.011 66. 309 18.856 37.050 1.730 11.637 81.918 33.342 33.200 1.730 17.516 43.207 38.836 51.600 1.730 18.190 6:3. 437 50.699 61.750 1.000 20.320 35.340 M N E M 0 N I C SI, GM TNG GR TNBK TRAT 6IGM TNG T'NBK TRAT 8IGM TNG GR TNB~ TRAT 8iGM TNG GR TNBK TRAT SIGM TNG GR TRAT SIGM TNG TRAT SIGM Z'NG GR TNBK TRAT SIGM TNG GR I'NB~ SIGM TNG GR TNfl~ VALUE 0.015 1000.000 100.025 500.125 0.999 35.388 545.341 72.400 382.1,25 3.475 22.573 145.891 56.625 325.625 2.854 18.886 220.834 21.700 316.250 2.,542 16.8'17 291.531 24.725 317.500 2.390 14.000 506.370 23.~50 332.000 1.830 19.171 211.841 2b.300 337.500 2.681 24.177 200.595 50.650 343.125 3.~77 22.888 959.5,30 55.125 375.250 3.234 MNEMON lC FSIG TFG GRBU TFBK TMOD FSI, G TFG GRBU TFBR TMOD FSIG TFG GRBU TMUD FSIG TFG GRBU TFB~, THUD FSIG TFG GRBU TFBK TMOO FSIG TFG GRBO TFB~. 'rMOO FSIG TFG GRBU TFBK TMUD FSIG TFG GRBU TFBK TMUD FSiG TFG GRSU TFBK TMOD VAbUE 0.000 499.875 500.000 200.050 ,3.999 31.05'1 1,00.714 72.927 50.900 0.576 18.490 34.840 65.684 33.000 1.'730 16.016 58.566 21.60,3 31.800 1.730 13.902 81..918 25.225 29.250 1.730 11.232 1~3.711 1.853 35.050 1.730 10.691 51.324 27.972 30.400 1.730 20.440 55.569 42.083 5'7.350 1.730 19.675 174.201 53.447 48.800 1.730 DEPTH '9800;000 971,0.000 MNEM[)N lC GR TNBK TRAT $ IGM TNG GR TNBK TRAT $IGM T:NG VALUE 83.1 375.6 ,4.9 39.1 31 '2.2 -999.2 -999.2 -999.2 -999.2 -999.2 25 25 27 51 66 5O 50 5O 5O 5O MN k. M 0 N I C GRBU TFBK TMOD F$IG TFG GRBU TF'BK TMOD FSiG VALUE 84.166 50.800 1.000 37.881 50.325 -999.250 -999.250 -999.250 -999.250 -999.250 MN EMONIC SI, GM TNG GR TNBK TRAT SIGM TNG TNBK TIRAT VALUE 3 g 1 207;2 88.5 385.6 4.6 -999.2 -999.2 -999.2 -999.2 -999.2 51 99 O0 25 20 5O 5O 5O 5O 5O MNEMUNIC TFG GRBU TFBK TMOD FSiG TFG GRBU TFBK TMOD VA~UE 40.91,0 4$.082 88.601 51.550 1.000 -999.250 -999.250 -999.250 -999.250 -999.250 S[]~,~AR ~ O~~ DATAr R~;CORDS N[I~4B~;R ' OF RECORDS: 1,52 LENGTH OF RECORDS: 1014 BYTES I'.,ENGT.B (IF LAST REC('IRD: '162 BYTES ,* * * * * * * * * * * * * * * * ~'~ I L, L T R A i L E R hENGTH: 02 BYTES FILE NAME: EDIT .003 MAXIMLIM PHYSI, CAL RECORD LENGTH: NF;×T Fi,LI~2 NAME: 1.024 B'YTES , * , , , * , , , * , * , , , * F; 0 F , , , , , , , , * * * , , , , , F" ,I L E; H E A D E R LENGTH: 62 BYTES F.ILE NAME: EDIT' .004 MAXIMUM PHYSICAL RECORD LENGTH: PREVIOUS FILE NAME: F1LE COM~IENTS PASS SiX. I 024 BYTES WELL SITE iNFORMATION RECORD BENGIB: CtIMPAN Y: WELL: [ I ELD: RANGE: TOWN: SECTION: COUNT~: STATE: 177 BYTES SOHIO ALASKA PET~O. CO. PRUDH[)E BAY 12N 32 N. SLOPE ALASKA DATA ~ORMAT SPECI~'ICATION bEbiGTM: 450 B~'TES ENTR~: BLOCKS: TYPE 0 SIZE REP C(]DE ENTRY 1, 66 0 DATI.1i~i SPECI,FIC&TI(]Ixl BLOC:RS; 1, C TO 0 b 2 SV{JRD~, UNI:,TS AP1 AP1 AP1 AP1 I:;'i,LEi~ &IZE EXP PROC SAM REP DEP'I,' SHIFT FT 0 0 0 0 0 4 0 0 1 08 0 0 GAPI,i 51 31 32 0 0 4 0 0 1 68 0 0 GAP 51. 31, 32 0 0 4 0 0 1, 68 0 0 CU 51 40 1 0 0 4 0 0 I 68 0 0 C U 51 40 2 0 0 ~} 0 0 I 68 0 0 CPS 51. .39 99 0 0 4 0 0 I 68 0 0 CPS 51 39 99 0 0 4 0 0 I 68 0 0 CPS 51. 39 99 0 0 ,4 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 C / C 51 ,42 0 0 0 4 0 0 1 68 0 0 51 43 0 0 0 ~, 0 0 1 68 0 0 '7 DE PTH 10620; 000 1 0 6 0 0.0 0 0 tO500. 000 10400. 000 10300.000 1.0200.000 10100,000 10000.000 9900.000 9800,000 9710.000 ~ ,Iq GR TEAT TNBK T R A T GR TNBK TEAT GR THAT GE TNB~ TEAT GR TN,BK TEAT GR TNBK TR, AT GR TRAT GR TNBK TEAT GR TNBK TEAT GR TEAT V A L U E 100,025 500,125 0,999 67.925 396.625 3.509 '74.275 333.3'75 3.17'7 25.075 316.750 2.469 24,050 321,750 2,492 23.525 359,125 1.954 33,125 351.750 2.726 42.350 369.500 3.059 57.725 410.000 3.16~ 89.000 41'7.625 4.870 0.000 -999.250 -999.250 MN EM[)N GRB[J TFBK T M 0 D GRBU T F B K TMOD GRBU T P't5 K T M [,] D GRBU IFBK T M O D GRBU T:M(]D GRBU T[,'"B g TMOD GRBU TFBK TMOD GRBU TFBK T M [) D GRBU TFBK GRBU TFBK TMUD GRBU 'I'F BK TMUD lC V A b [,1E 4,99.875 200.O50 3,999 63.811 58,100 0.576 '73.177 33. 050 1.730 24.6 ()(~ 30. 250 1.730 2,3 851 29:100 1, .730 24.226 40 10~ 1:73 33.092 39.350 I, .730 41,209 53,800 1.730 56.194 57.500 1.730 96.154 60.350 1.000 -999.250 -999.250 -999.250 MNEMONIC S1GM TNG SI. GM 81 G M T N G 61 GM TNG SIGM TNG S I GM TNG SiGM TNG TNG SiGM TNG SiGS TNG SIGM TNG VALUE 0.015 1000,000 ,38.1.'76 850.012 22.033 136.148 18. 1361 312.016 13,640 499,375 19.545 222.583 24.926 258.056 22,138 311.267 39.271 352.985 -999.250 -999.250 MNEMO.NIC FS,IG TFG F$iG TFG F$iG TFG FSiG TFG F:SIG TFG F$IG TIFG FSIG TFG FSIG TFG FSiG TFG F$IG TFG F$1G TFG VALUE 0.01.5 499.875 35. 766 18'1.188 1'7,096 35.589 16.286 57.56'7 11.932 7 11.892 1.64.585 1'7.4'71 72.552 19.105 03.312 19.690 62.812 42.394 44.580 -999.250 -999.250 DATA. EECORD$ NI,,IlVlBER'~ £1F" RECORDS: 80 LENGI 't []F RECORDS: 1018 .B~'TE$ h~,; GI'I-t []F [,,AST RECORD: 18,2 BYTES I;',ILE TRAILER LEN G'I~}'i: 62, B~TES FILE NAME: EDiT .004 ~4AXIMUIVl PHYSiCA, I~ RECORD LENGTH: NEXT FI. LE NAME: TAPE TI~AILER I.,ENGTH: 1.32. BYTES 'rAPE NAME: 60352 SER'V ICE NAME: EDIT "]?APE CUNTI, NUATiON NUMBER: O1 NEXT TAPE NAME: C (JMM~N ~J.'S: 102,4 B'YTE;S DATE: 80/ 4/14 (c. sea' e~6~Obo 000o00 5555555555 5555555555 7111 / 777'/7 066~6b 000000 5555555555 5555555555 1777'777777 66 00 0 o 55 55 '17 ~t~ O0 O0 55 55 '17 e,(~ O0 0000 555555 555555 7 66 O0 0000 555555 555555 ~{:{~e:oO 66 O0 O0 O0 55 55 77 66060066 O0 O0 O0 55 55 '7 1 b6 06 0000 00 55 55 '1 7 6b 6b 0000 O0 55 55 ? '1 ~.~6 oO 00 00 55 55 55 55 "17 e~ 66 00 00 55 55 55 55 77 b e, 6 ~ e, e~ 0 0 0 0 0 0 5 5 5 5 5 5 5 5 5 5 5 5 7 '? 660666 000000 555555 555555 "l * LS 1~ A R '[' ,* U,S E iq t? C. A t. [ 10 ? 0 'l, b 05.1,5_ '7 J ,,] O B L~,['i I ,P ,S ~; 0. 4.13 b I,.) A"I' b.; 1 .~ -' A U G-. 80 112: '12: 20 ~(JNI!t['.]R ;5~.S ~1.10L, 37 ,APiq-80. ,8 ART* ,8Ii'A~'.I!* U&P.,P, PCAI, 1'.10707,b0557J dO~ SHIP SECa. 41.36 DA'Ii~] 14-AU(;-80 12;42:2U N (] N .l. T (J R ,.5 ~'~ ~ ,K ~ 1 0 g .~ '1 A P R' 8 0, * ,5 T A.R']IL' * SSSSSSS5 HH. hid SSSSSS$S H~ Hid S S l-i H lq M S S H ~ H h SSbSSS NHhHI-iHiMHtiH I1 11_ Ii Il [.1 i.I Il 11 I1 I1 I1 i1 1. i 1I I1 ii 11 II. IL l PPPPPPPP PPPPPFPP PP PP PP PP P P FP PP PP PPP~FPPP PFPPPPPP PP PP PP PP PP PP T 'l .,7' f T T 7 'IL' '1' '1 Ij (j tO D i) LI T ~.' '.1' 1' I?'l' 1'1~: '11 ']. l? LI t.i () ~., T ~ £.1( ) l,J U tr 'I! O U L) O I' 17 t.j O f, ) (j 1: T CI (j O U T '1~ iii 0 1.,) LJ T T O U O u 't T Ii.) [J 0 [3 t,J U T T u,(o [.) o U 0 *6'I'ART* bSb~ PCA.L, 1.10'707,60,5,i5.'7j dti~ Ship ~.,~. 41.]6 DATI:; 14.-AUG-80 MilNI,"["I. JP, ~:fi itLl.(.)E.37 AP.R-80. *,5 A t' iL b E;: I) 8 i',l~;h it: S,.i ~x~tt 'TI P~., O' T(.J; 41 42_5- A5 >O G[ -1 08 0 ? 0 71 ~ 6:04 52 5:4'14'1 C P, ~ A T fi; D: 1 ,t - A U G ,- 8 0 1 1; 5 g: 5 6 ii t,.,1 g U I~; S 'w 1. ~' C H E; 5: I t; I.. 1., E,: ~ t.] ~ T t C ID P I k ,S .' 1 /bP/4CI. I~G:I /b.l. 141'1' :1. 2 '2 12:42:20 S}t ..lf' PCCC 5~IPPING ibS'.~RUCT I{~N& 1SSO[~D I,]-AUG,-60 .1.!:59 CAI, ii- bi~N 1 A PCCC (, ( 111111 Iiiii1 11 11 i I lI ]1 ]1 11 11 11 ]I 1iiiii Ii111I YY Y~ 000Oi:~O O000uO 222222 0o0000 000000 222222 0 {) 00 0 U 0 0 22 22 0 O 0 L) 00 00 22 22 0 o O 0 {') 0 0 0 O 0 0 0 2 2 00 (', 0 U 0 00 0000 22 0 0 0 0 0 0 0 0 0 0 0 0 2 2 00 ti) 0 O 0 00 00 00 22 000U u0 000f 00 22 0000 O0 0000 O0 22 00 U 0 0 0 00 22 0 0 0 0 00 00 2 2 000000 000000 2222222222 000000 000000 2222222222 ~t36 DA'I' ~. 1,4 - A U G- 80 1.4-AUG-80 12:30:50 12:42:20 8. CitbUMBLRGLR CO~4PU I' 10707,00551 PE, kL h kA D ki-', [,kaIG'l id: 132 1', ~, E.L, NAPE: P.C.A.b. 8kgV I. CE NAi~k: El.) I '1 iq' E; kb CiJN'I' 1N U A'[ 101'~ C{..~b'~Mu, r~'8: .bls F[iRr,~A[~ CIJSIU[~'tER 'tAPE. I)A:I'I~: 80/ 8/14 'l?APk l.,k I,i (,,'1 ~: 132 I'APE NAN,,: 0055'1 DAT~;: 80/ 8/14 5~,~V JCk NA~E: EL)Il TAPE C[JNTINUATION NUHBER: O1 f'Rf.~iC.Jtt~ '].'APE. NAN~J CUMI~ENI'~: LINI~'Uk Wg.[.L, IDkNI'lk.I. CATIUN i'4UNbNB 1~ 50-029-20388 024 BYTE8 ~..i.,l~ 8.II'E; [NI. OIRMATI. Ui'~ RkCORD 1,7'7 BYTE;8 ,.fiU.itlU AbASKA PkTRU. C(]. Fi-6 P R U D H.I.'] E B A ~ 1 3 12N ALAS~,A t,LNG'I ~: ,:150 0 s1zr~ 1 6b 0 I')A'I:~.~M ,.SPE, C.I,I~ ICAIltJN tJ~ lis AP I AP1 F'I' 0 0 GAl-' 1. 51 31 3 GAP1 5i ~1 3 CU 51 ti0 CO 51 4O CPS 51 39 9 CP,S 51 J9 9 CPS 51 39 9 CP~ 51 39 9 CtC 51 42 bl 43 1 0 2 0 2 0 1 0 2 9 9 0 9 0 9 0 0 0 0 0 f liaL~ REP 0 4 0 0 I b 8 0 0 0 4 0 0 1 08 0 0 0 4 0 0 1 68 0 U 0 ti 0 0 1 08 0 0 0 q 0 0 1 b8 0 0 0 4 0 0 1 08 0 0 0 4 0 0 1 o~3 0 u 0 4 0 o 1 b8 0 0 0 4 0 0 ] 68 0 0 0 q ,) 0 I 68 0 0 0 § 0 0 1 08 0 0 'U k, F 't l u625. 000 10600.000 10500.000 O400. 000 10 ilO0. 000 1 O2OO. 00O 10100.000 It 00~0 . 000 9 9 00 . () 0 0 '98 ~ 0.000 97 1 0. 000 TR 'I k A 'I' T R A '1 G H T N B ~, T h A GR '1 bi B K TEAT GR ~[ NB.K T H A I' I'P, A T qt' i',l B ,~, T R A I TN BK T R A T G R I' .lq b 1<:, 'I l{ A '.[' T' };t A T -999.0OO -999. 000 -999.000 20U.O00 500.000 1.000 54.100 121.220 3.213 10.850 1.45.589 2,b45 1 I. 25(.) 1.75.581 9.450 202.07~ 1. 20.900 222.069 2.605 .33.05 o 251.1,8'7 2 · 3.3 1 44. b 00 290. ,427 3.073 8O. 250 295. ,30 1 ,4. 435 - 999.250 -999 . 250 -999.25O ~Mt.~iq lC GRB O T.rq L~ D G.Rt3 O Gl<BO 'I'F BK '1' t.'! U D GH B U 1[- BK 1' f4 [.J D GHbU TI' bK '1' ,~,'1U L) GRPJU T.[' BK TM 0 D GR B tJ "I't' BK '1,' M U ,D G R B O I GRBU I'MI)D G R b U %, ALLI -999. -999. -999. q (.)9. 20 0. 5~t. 15. 1. 11. 14. 1. 12. 24. 1. ,.~ ,il. 41. 1. 201. 53. 1. 42. 1. 79. - 999. -999. -999. 0 O0 000 () 00 875 000 gq9 558 150 732 700 731 bi2 450 732 859 900 731 458 80O '131 '748 800 '732 810 ] 50 731 9 O0 5 () 0 00 1 250 25 0 25O ~1 b)L MuN lC b i Gt',l 'r N (,; & J, GM 1' N G b IGM T N G ,S l G M b [ G M ',l' N G ~ING ~ 1 G tvl 'r .N G TNG 5I,.GM T N G 5 ,.t g ~t T N G VALUE -999.000 -999.000 0.015 lO00.OOO 20.599 954.557 18.b02 952.u~4 931.330 13.873 939.82b 19.070 915.35b 22.996 8'15.905 22.~52 8'75.15b 38.0 0 7 8 52.434 -999.250 -999.250 i,1 ~'~ L bi u ~ 1 C ?'sig Tb G ['SLG FSIG I'FG FSlG TFG t"'8 IG 'I'FG FSiG TI'"G TFG t~'S IG TFG T F G I' FG -999.000 -999.000 0.015 500.000 18.207 46q.784 lb.lbq 450.283 14.b85 12.003 442.bb8 1 b. '108 ~'l .539 19.990 41 't .0~2 19.585 431.052 39.096 429.553 -999.250 -999.250 S [J r~l Fi A i~ ~. U t' l) a T g lq k,C u H 1.) 5 r',It.t~vlBElr¢ (.jk BkCLJRL),SI Bt.) LEi'.~GIr~ U~ H[.CUkt)S: 10i8 I_I.,E; ']'i4A 1 bEE 102~ FIb.E ttEADEIq 1024 ;SUH1U /4LAbKA PE'I"~I..i. 1,3E N. SL,.G F: g ALASKA C t). lYF'd, SIZk 1 bk, PI GH i L)'I'N GHBII 51GN '.[DI'N f 5I G qDTM TI" bi',, '1.£)'~ ,I' ~l G [ I':,'t 'l'f G 'I NOD 1D'I'~M GR 'I 0I fv~ G },: 8 tJ T D ~' M S 1. G ~ & ':t' i,~ B ~, 'T D 't' ['4 T [" B K i D T ]' N G I D T '1'~' G ',I DTN '1' ~ A '][' :L 13 "[' {vi I' M (J D T GAP,I. (;APt C U C u CPS CPS CPS CPS C/C GAP .1 GAPI CO CU CPS CPa CPS C/C AP AP1 AP1 Al-' t 0 0 0 0 bl .31 32 0 5t 31 32 0 51 40 1 0 .51 40 2 0 bl 39 99 0 5i .]9 99 0 51 J9 99 0 5i 39 99 0 51 ~}2 0 o 51 ~3 0 0 51 31 32 0 ..5l 31 32 0 bl 40 1 0 51 40 2 0 b 1, 39 99 0 51, 39 99 0 51 39 99 0 51 39 99 0 b I ~2 0 0 .51 43 0 0 [' ~ SiZ~ LXP PROC ,SAM RI.:P DLPi' Sttll~ 1' 0 ,'~ 0 0 I o 8 0 0 o ~* 0 0 1 08 0 0 0 4 0 0 1 08 0 0 0 4 0 0 1 o8 0 0 0 4 0 0 1 68 0 u 0 4 0 0 1 08 0 0 u 4 0 0 1 08 0 U U 4 0 0 I. 08 0 0 u 4 0 0 1 ~ 8 0 0 0 4 0 0 1 b 8 0 0 0 4 0 0 I ~ 8 0 0 0 4 0 0 1 o 8 0 0 0 4 0 0 I 08 0 0 0 4 0 0 1 08 0 0 0 4 t.) 0 I ~ 8 0 0 O 4 0 0 1 68 0 O 0 4 0 0 1 ~ 8 0 0 0 4 0 0 1 O U 0 0 0 4 0 0 1 68 0 0 u 4 0 0 1 0 ~ 0 0 0 4 0 0 i ~8 0 0 10500. (~00 040O. 000 1 O300. 000 10 100.000 t 0000.000 9 u, 00.000 M r,~ ,t, t'3 t.J N 1 C TRAI S 1 (;M GN 'i' HA 'I ~IGM 'i' N G GR T N t-5_ 1RAY i' H G TNBK 5,1 G g I' N G 'I N B h 'i'I~.A ],' 81 G,M TN G T R A T $ I G M T hi G I' N ,B K T R A T T N G I' N B ,K T }< A T ,T NG G R '[' N B K T P, A T $1 G M I'NG VAL -999 -999 -999 59 0 199 1 0 1000 52 2i5 19 949 13 28.4 2 18 929 287 2 16 931 13 326 1 13 945 23 320 2 20 916 38 .,~37 3 23 55 4O ~ 2 22 893 U L . .000 .000 .955 . '? 49 .900 .00() .001 .015 .000 .350 .181 .9'74 .910 .554 .525 .951 .838 .300 .0'78 .255 .524 .086 .500 .043 .865 .498 .318 .7 () 0 .170 .50b .300 .354 .150 .666 .21 :~ .296 .421 .35O .52 .~ .890 .0,37 .13~ LHUm lC G~ ~3U 1 iq lJ D ?SIG GRbU I'P :tHUD ?8iG t'kG GRBU 1' M t,I D 'I'P'G G14BU TP'BK, "1 M U D ~IG 'i/FG GRBU TP BK '1 M [3 O FSi G G 14 B U T M 0 D P'SIG T.FG G14~ U [,'S I.G GRBU TFB ~L T F (3 VA6 -999 -999 '999 59 0 499 200 0 5OO 54 28 1 27 1 lO ~59 16 29 1 14 451 13 35 1 11 450 38 1 443 221 60 1 17 52 57 19 43 e~ UE . o 00 .000 .000 .955 .375 .875 .000 .gq9 .015 .000 .432 .950 .732 .948 .527 .733 .850 .731 .b78 .150 479 ,~ 00 732 .221 .786 .10'9 .000 .7 32 . ~43 .287 .452 .700 .7.32 .169 . 043 .973 .550 .731 .8:1 '7 .063 .559 .05O .001 .40~ k M ( t t'~ I C blGF! £NG 'l'tqAl' TNG 'I lq A 1' 61 G 1,1 1' N G 'INBK I'R A 1 61GM TNG GR 'I iq A i ;S .I G M TNG GR I' N i-3 TRA 1' TNG GR TRA T TNG GR T N B K TRAT b I G M TN(.4 GR TNBK TRA .1' &IGM T N G GR T R, A '£ V .A L, 0 L -999.000 -999.000 O.OOO 0.000 5.000 0.015 999.~50 199.900 499.875 1.001 21.qb8 935.081 57.900 ~35.5tl 2.8~8 18.532 929.838 1, 6. ~()0 350.412 2.416 16.449 936.579 18.500 356.161 2.3~1 1,4.112 939. 825 19. ,300 ,:370. S 32 I. 84'1 19.820 922.846 28.300 3'78.155 2.5'71 23.506 859.925 43.~50 :378.155 3.21~ 22,457 888.389 56,900 44(1.5:15 3,019 lq,~ LIqUN lC T [. G TF 15N TMUD i'P'G GF,~U TMUL) P$1G GRdU I'FflK TMtJD 'tFG GRBU 'raoo GRBU T~'BK FSIG TFG TMOO FSIG TFG GRBU TFBK TMOD FS ,IG TFG TF'OK FSIG TFB.F', "t'MOO -999.000 -999.000 0.250 0.000 0.0O2 0.015 bO0.O00 499.U75 200.000 3.999 1~.993 ~49.o~3 50.929 1,131 1'~.229 453.160 15.4u1 32.300 1.732 14.281 458.531 20.474 34.600 1.731 11.808 45o. 03 7 18.002 39.450 1. '13 1 1b.84,3 456.408 39.5'70 49,400 1.131 20.155 393.080 199.750 62.400 1.732 18.710 q34.549 bi.b50 1.i03 ¢7i. 0,000 M.~kMtjN lC '1N G Gl-< T.N Bi~, 51GM VALUE 80.0 375,1 _~8.2 ~55,9 -999.2 -999.2 -999.2 -999.2 -999.2 00 5~ 5O ~7 .~ 0 5O 50 5O 5O 50 1' bl ( ) D i'SIG 'I'F G 'If: G V AB UE ~7.9 I.O 38.8 4'4.1,6 -999.2 -999.2 -999.2 -999.2 -999.2 9~ O0 O1 41 5O 5O 5O 5O 5O MNEMONIC 5 IGM TNG 'rNB~ T k A 1 THAI VAI~U 38. 84 '?. 85. qO '7. 4. -999 -999 -999 -999 -999 097 940 bOO 495 250 250 250 250 25O P$1G G~BU T M U 0 TInG GRMU T lq O D VALUL 3U.oOl ~24.~0~ 83.b45 b~.200 1,001 -999.250 -999.250 -999.250 -999.250 -999.250 SU!q~,,AF~'~ U? OATA I,bNG'l.d d~ kkCt..l~i)~ 1014 f 11,,~, NANg: EDIt1 .002 i'.'~AXIHUH PH.~$1CAL P,E, CU~D ULNGTH: :L 024 J 02~1 N: : ,5 (.iH 1, {J AbA,SKA PRUUH{]E, bAY 32 N. 8 hO P ~ Ct.). 0 1 CODE 66 ( ( (" I $.i. GN IDI'N 5 [' S 1 G t"5 ti. ixl~ 9 T [' G 'I D T {4 0 1. 1~ A ~' T OTt,l 1 'i N (J D '1 u 't 2 GP, '1: GHbL~ TDTb~, '1. S 1Gt.a 2DTN 5 i. SIG 8 '1' i',l G 'I D T ~ T i..,t A 'f I' L)T 1 ']) Pi UD ? O't.FI I. JN i'-[ S i APl A~ b~ O 0 GAP I b 1. 31 3 GAPi 51 31 3 C U 51 40 CPS 5 1 ,39 9 CPS 51 39 9 CPS 51 39 9 (.:PS 51 ,'.12,9 9 C/C 51 42 51 ~3 GAPI 51 31 3 GAI?I 51 3:1. 3 CU 51 4O CI, J 5 1 ~0 CPS 51. 39 9 CPS 51 39 9 CPS 6 1 39 9 CPS 5 1 :]9 9 C/C 51 42 5 1 /~ 3 AP1 0 ',') 2 0 1 0 2 0 9 0 9 0 9 0 0 0 0 0 2 0 2 0 1 0 2 0 9 0 9 0 9 0 9 0 0 0 0 O PROC 0 4 0 0 I ~ 8 O 0 U ~, 0 0 I o~ 0 0 0 4 0 0 I b8 0 0 0 4 0 0 1 b~ 0 0 0 4 0 0 ! b8 0 U 0 '~ 0 0 1 b 8 0 0 o ~ 0 0 1 08 0 0 0 4 0 0 ! b8 0 0 0 4 0 0 1 O 8 0 0 o 4 o o i b~ o o 0 ~ 0 0 1 08 0 0 0 -% 0 0 I ~ ~ 0 0 0 q 0 0 I b8 0 0 0 q 0 0 I 6~ 0 0 0 q 0 0 I b8 O O 0 4 0 0 I 6~ 0 0 0 q 0 0 1 b8 O 0 0 4 0 0 I 68 0 0 0 4 0 0 I O8 0 u 0 .:~ 0 0 1 b 8 0 0 0 4 0 0 I 68 0 0 I (~b2b. 000 1 ()bOO · 000 10500. 000 104. OO.000 103 O 0 . 000 10200.000 10100 . 00 0 1, 0000,000 9 9 U 0. (:) 0 0 TNb[',. 'INA1' 'I' [4 G '£ H B K 'i' iq g l' TNG (; H I'NbK "1 MAT SIGN :[ i'4 G GR T 1~ A T SIG~!4 I: N G 'I"RAT $1 G GA T h B ~, T iq A T G f{ T R A T 8 I, GM 'i ,N G GR GA '1' t3,{ A 1' 8 'it t',l G VA/: 0 0 59 0 1,99 5UO 1 0 1000 bb 300 3 21 939 22 374 932 21, 381 2 16 931 19 394 13 94:2 '33 397 2 19 907 ~2 399 3 23 867 54 44:1, 2 23 886 Uk · 0 0 0 · 00 () .955 .749 ,900 .000 .001 .015 · (30 O .000 .179 .109 .825 .~50 .031 .538 .532 .584 .4 00 .155 ,255 · 4,3,4 .151) .:151 .715 .821, .250 .651 .5'7~ .835 .366 . .300 .525 .260 .915 .450 .390 ,858 ,011 GRb U T iq tj O [',BIG l FG GNrJU l'f' BK ~$1G G~BU 'I ?1U L) ~81G ],'P (3 GRBU '1' P10 D t, 8IG GR,t~ U fSiG 'l'fG Gl{BO f$iG TP'G GI~i-J l) Tf G GRBU T Pi O I) G R,B 0 f,S1G I'.F G V AL 0 0 0 b9 0 :t99 2 O0 3 0 50O 04 35 1 1.9 461, 2..~ 33 1 17 456 22 34 1 1.4 45 '1 1.9 42 1 11 449 4.3 53 1 15 450 237 1 1.9 409 49 57 I 2O 4 ,], 3 ill .250 . OhO .002 .955 · J75 .875 .000 .999 .015 · 000 .170 .850 ,732 .466 ,529 .850 .732 .323 ,782 .597 .100 .732 .700 .157 .9'15 .550 .732 .823 .413 .9,45 . .] 5 0 .732 .91,4 .912 .703 .tO0 . 7 32 ,555 , O68 .563 .200 .7 31. . OO5 .800 I N G T N b ~ IRA£ 5 .I GM I'NG IR A'I 5 IGM lNG 'I.'NB K IRA't' 5 1 G M I'NG I'NBtS TRA ,B1GM 't N G GR T N B ~, :1' N G T N B K T RA ,5 i G M T NG GR Ilea I SIGN TNG ".1: N B T R A 'I' T N G GR 'I~ N B K VALU~ 59.955 0.749 0.000 0.000 0. 000 0.015 1000.000 199.900 500.000 1.001 21.078 939.825 b7.000 374.056 3.012 19.221 923.845 25.150 388.903 2.5O8 1'7.004 93:1.336 21.900 ,395.651 2.410 1,4.09'7 936.829 21.000 411,272 1,836 18.757 918.352 33.200 ,~14.:146 2.581 23.0 '20 866. ~ 1, 7 41.550 '41, 7. 396 ]. 394: 22.50,2 02.85O 49o.126 2.89.3 FSIG TF G (;RBU '.IF BK i MDD FSiG 'I'FG G~bu ~$IG GRBU 'I'FG GRBU Tf'BK TgOO TFG GP, UU T ~1 U i) F$IG TFG GRBU TFBK T~OO TFG ~i'M rid 'T FG GRBU P'5iG 'I'FG GRBU .[FBK VAbUg 59.955 0.250 0.050 0.002 0.015 500.000 499.875 200.000 3.999 17.991 452.bb0 00.007 39.400 1.732 15.899 449.413 24.~O9 37.100 1.732 13.~87 452.bb0 20.21'1 3~.300 1.732 il.434 442.043 20.649 45,100 1.732 15.089 ~50.602 57.300 1.732 20.485 40?. 1.95 231.586 08.200 1.732 19.885 431.801, 57.428 00.450 1,.001 /; [) k, t: T H 9 ~ 0 0 o O 0 0 9'71 0.000 'I' N $I .ri' N U 1'~ 1 C BK. AT GN G BK AR' G b~ G qgL 89.5 ,q. 9 31.9 850.1 -999. -999. -999. -999. -999. 00 50 50 bO 50 50 1'? G (.¢i4B U 'iF t:SK 'l'~qUD P31G T~G VA 8 5 3 43 -~9 -99 -99 -99 -99 L{JE 9.513 1.250 1.001 9.051 1.177 9.250 9.250 9.250 9.250 9.250 TNG T ~ A 'I ,51G~ 'I~A 1 VALUE 37.318 863.421 bo.900 437.510 -999.250 -999.250 -999.250 -999.250 -999.250 Mt~MMUNIC 'IFB5 i~ M O D 'IFG GR~O VAbUk 31.t~57 442.543 84.145 53.850 1.001 -999.250 -999.250 -999.250 -999.250 -999.250 ~'~titqt~.i-~ UF PE. CURL;,.b: lb3 I,E. NG'II-~ UP HI~CuHD~,: I 0.1. :} F i.l_,k i.,i:.',"~G'} t-~: 62 ~YTES iL. iL b~ A t,,~ E, '- ~, D .i. 1.' ,003 i~A.x.LP!Ulv~ .P~tSIC/-\b PE, C,JHI.~ LE, NG(IH," 1024 155~TL,5 ;I~ A P' fi: "l,' R A .[ L E, h I,) A 'I' E;: 8 () / 8 / 1 .4 8E;~ V iCE; .NANE: t,D I. I TAPh Ct~NTiNOA'.t'IUN Nt)~.~bEP: 01. :~.,X'I' TAPE NAI~k: C(.)~NTS: [iN].~U~; ~,~P.,bL IDE, NT't, FJ. CATILII~i NUMB.ER I.~ 50-029-20388 (' ( (