Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-064C:\Users\grgluyas\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\R97USUAM\2024-09-06_22614_KRU_1B-19_LeakPointSurvey_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22614 KRU 1B-19 50-029-22475-00 LeakPoint Survey 06-Sep-24 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ _____________________________________ Date received Signature ______________________________ ______________________________________ PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 194-064 T39543 9/11/2024 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.09.11 09:20:23 -08'00' • • STATE OF ALASKA • RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION MAR 2 6 2015 WELL COMPLETION OR RECOMPLETION REPORT AND LOG,` 1a. Well Status: ❑Oil 0 Gas 0 SPLUG 0 Other ®Abandoned 0 Suspended 1b. Well Class dGe( 20AAC 25.105 20AAC 25.110 0 Exploratory ❑Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completion Zero 0 Development 0 Service - 2. Operator Name: 5. Date Comp.,Susp., Aband 12. Permit to Drill Number BP Exploration (Alaska) Inc. 2/26/2015 196-064 314-634 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 4/12/1996 50-029-21396-03-00 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 4/26/1996 PBU 09-31C 1587' FSL, 998' FEL, Sec. 02,T1ON, R15E, UM " 8. KB(ft above MSL): 55' 15. Field/Pool(s) l; Top of Productive Horizon: , 2526' FSL,2186' FEL, Sec. 02,T1ON, R15E, UM GL(ft above MSL): 19.8' _ Prudhoe Bay/Prudhoea�i Total Depth: 9. Plug Back Depth(MD+TVD) . tS 4297' FSL, 2601' FEL, Sec. 02,T1ON, R15E, UM , 3505' 3505' ' p 4b. Location of Well(State Base Plane Coordinates, NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 717376 • y- 5943027. Zone- ASP4 - 10946' 8824' ADL028327 " TPI: x- 716161 y- 5943931 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 715694 y- 5945690 Zone- ASP4 None 18. Directional Surve Y: ❑Yes 0 No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: GR, MWD 9060' • 8739' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 111' Surface 111' 30" 1800#Polyurethane 13-3/8" 72# K-55/L-80 Surface 2533' Surface 2533' 17-1/2" 2500 sx CS III,400 sx CS II 9-5/8" 47# L-80 Surface 8400' Surface 8132' 12-1/4" 500 sx Class'G', 300 sx CS I 7" 29# L-80 8234' 9060' 7973' 8739' 8-1/2" 264 cu ft Class'G' 2-7/8" 6.5# L-80/13Cr80 8816' 10945' 8525' 8824' 3-3/4" 17.5 Bbls Cement 24. Open to production or injection? 0 Yes ®No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) of Top&Bottom; Perforation Size and Number): 4-1/2", 12.6#, 13Cr80 3715'-8843' 8774'/8487' .,',, a 26. ACID, FRACTURE,CEMENT SQUEEZE,ETC. fCt flA i NOV 2015 N./co WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes 0 No G 3r, DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ...., See Attached 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Injection N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes 0 No • Sidewall Core(s)Acquired? 0 Yes 0 No , If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None • Form 10-407 Revised 10/2012 CONTINN ED ON REVERSE Submit Original Only �l� l p s i ///' --- RBDMS APR 1 0 2015 ' V6 29. GEOLOGIC MARKERS(List all formations arrkers encounter 30. FORMATION TESTS NAME D TVD Well Tested? Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sadlerochit 8946' 8641' None Formation at Total Depth: 31.List of Attachment Summary of Pre-Rig Work, Summary of Daily Drilling Reports,Well Schematic Diagram 32.1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Noel Nocas,564-5027 Email: Noel.Nocas@bp.com Printed Name: Joe Lastufk Title: Drilling Technologist Signature: Phone 564-4091 Date: 3/Z6715 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listingof intervals tested and the corresponding formation,and a brief summaryin this box. Submit detailed test and analytical laboratory p 9 Y information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only • • WELL NAME: 09-31C 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 8922' Set CIBP 8909' 13.5' Cement 8717' - 8722' Tubing Punch 8894 Additional 13.5' Cement 7039' 53 Bbls Class 'G' 3715' Cut & Pull Tubing 3530' Set EZSV 3505' Set Whipstock • • 09-31 C, Well History (Pre-Rig Sidetrack) Date Summary 01/10/15 INITIAL T/I/0= 100/0/0 PSI. SWAB NOT HOLDING DURING LTI. CALL GREASE CREW. SWAB VALVE WORKING, CONTINUE RU. DHD SHOOTS FLUID LVL AT SURFACE. RUN 1: RIH WITH PULG.TAG OBSTRUCTION AT 2630' BASED ON AWGRS NOTES COULD BE AN ICE PLUG. PUMP MEOH. SET AT 8922'CCL TO ME= 11.38'CCL STOP=8910.62 . OAL LEFT IN HOLE= 1,3' DEPTH CORRECTED TO SLB CCL LOG DATED 24-NOV-2001 POOH. RUN 2: RIH WITH DUMP BAILER. DUMP 13.5'OF CEMENT ON TOP OF PLUG AT 8922' POOH. HIT SCHMOO AT 3580' PULL 300#TO PULL THROUGH. RUN 3: RIH WITH DUMP BAILER.TAG TOP OF SCHMOO AT 3580'WHILE RIH. UNABLE TO GET THROUGH. POOH. 01/10/15 T/I/O=5/30/vac Temp=S/I MIT-T 2500 psi***PASSED***(Assist E-line) Pumped 2.5 bbls of diesel down Tbg to achieve MIT-T test pressure of 2500 psi. Tbg lost 91 psi in 1st 15 min and 16 psi in 2nd 15 min for a total pressure loss of 91 psi in 30 min test. Bled Tbg down to 30 psi, bled back-2 bbls. IA,OA=otg. FWHP=30/30/vac. MIT tag hung on MV. E-line on well of deparure, DSO notified. 01/11/15 INITIAL T/I/O =0/0/0 PSI. RIG DOWN BAILER. FIND THEM PACKED WITH SCHMOO. RIH W/TBG PUNCH STRING, SIT DOWN ON THE SCHMOO @ 3580', MAKE IT THROUGH. PUNCH TUBING FROM 8716.5'-8721.5' . CCL TO TOP SHOT=5.67'CCL STOP DEPTH =8710.82' INITIAL T/I =250/0 PSI,AFTER SHOOTING T/I =200/50 PSI. DEPTH CORRECTED TO TUBING TALLY DATED 19-APRIL- 1993. POOH. RIG DOWN CRANE FOR HARDLINE/LRS CREW TO FLUSH WELL. 01/12/15 T/I/O=0/25/0 SI Circ well with Hot DSL/KCL to flush out schmoo(SIDETRACK) Pumped 2 bbls meth followed by 270 bbls 180*DSL, 2 bbls meth, 360 bbls KCL, 5 bbls meth, and 80 bbls DSL for Circ/FP. U- tube TxIA for 1 hr.Tags huing on MV/IA AFE sign hung***FLUID PACKED WELL***Valve positions=SV WV SSV closed MV open CVs OTG ROS SI Return well 09-30 remains online SV closed FWHP=O/0/0. 01/12/15 STANDBY FOR ONGOING P-PAD INCIDENT, STANDBY FOR LRS CIRC OUT. INSTRUCTED TO RIG DOWN. RDMO. FINAL T/I/O = 120/0/0. 01/14/15 INITIAL T/I/O=0/0/0 PSI. RIH W/2-1/8" DUMP BAILER FILLED W/CEMENT. DUMPED AN ADDITIONAL 13.5'OF CEMENT ON TOP OF CIBP&CEMENT. FINAL EST TOC @—8894'. WELL LEFT SHUT IN UPON DEPARTURE- NOTIFIED PAD OP OF WELL STATUS. FINAL T/I/O=0/0/0 PSI. 01/15/15 T/I/O=0/0/0 CMIT TXIA to 4000 PASSED (see mit data)well is fluid packed with 5 bbls neat and 8 bbls dsl bleed pressure back to 0(continued on 1-16-15) (fluid packed annulus sign hung on master). 01/19/15 Job Scope: Fullbore P&A T/I/0 50/291/0. R/U &Spot equipment, PJSM, Go over Well Entry Checklist, PT Lines, Pump 5 bbls of 60/40, Pump 220 bbls of Fresh Water, Pump 190 bbls of diesel, Pump 251 bbls of Fresh Water, Pump 53 bbls of 15.8ppg Class"G"cement, Pump 2 bbls of Fresh Water, Launch Foam Balls. Pump 5 bbls of Fresh Water. Open all valves. Pump 64 bbls of Fresh Water, Pump 46 bbls od diesel. Shut down, Wash up Cement truck. R/D. T/I/0 0/290/0. Length of cement plug: 1855 md. Depth of cement plug: 7039 slm. Type of cement: Class"G" Weight of cement slurry: 15.8 ppg. Volume of cement slurry pumped: 53 bbls. UCA: 2118 psi at 30:13:30. 01/20/15 BRUSHED BPV PROFILE W/5-1/2" BRUSH&3.50"GAUGE RING.(no issues). RAN 2.50"CENT& 1- 3/4"S. BAILER, TAGGED TOP OF CEMENT @ 7,039' SLM. (cement sample recovered). DRIFTED TBG W/3.50" CENT&2-1/2"S.BAILER DOWN TO 4,600'SLM. (no issues). Page 1 of 3 • S 09-31C, Well History (Pre-Rig Sidetrack) Date Summary 01/21/15 T/I/O=5/-12/-13 Temp=S/I Assist SEL CMIT TxIA to 2500 psi pre-cut Passed (Pre Sidetrack) Pressured TxIA to 2500 psi with 8 bbls amb diesel using jumper hose to equalize psi from IA to tbg. (pre-cut)TxIA lost 15/19 in 1st 15 min, and 13/13 1n 2nd 15 min,for a total loss of 28/32 psi in 30 min test. 01/21/15 INITIAL T/I/O= 180/0/0. MIRU. PT. LRS PERFORM MIT ON TUBING AND IA. FIRST ATTEMPT FAILED, PASSED ON SECOND ATTEMPT. BLEED DOWN PRESSURE ON TUBING AND IA. RIH WITH 3.475" POWER CUTTER.TUBING CUT AT 3715'. CORRELATED TO GLM#1 WITH TUBING TALLY DATED 19-APR-1993. POOH. RDMO. FINIAL T/I/O=40/40/0. 01/21/15 INITIAL T/I/O= 180/0/0. LRS PERFORM CMIT-TxIA TO 2500#PRE CUT. RIH W/3.475" POWER JET CUTTER&CUT TUBING @ 3715'. GOOD INDICATION OF CUT BY PRESSURE SWAPPING ON TBG/IA. TIED INTO TUBING TALLY DATED 19-APR-1993. FINIAL T/I/O=40/40/0. LRS ON LOCATION UPON DEPARTURE TO PERFORM CMIT TxA POST TBG CUT. WELL LEFT SHUT IN- NOTIFIED PAD OP OF WELL STATUS. 01/22/15 MIT-COMBO to 4000 psi T/470/523/-11 Pumped 8.8 bbls AMB. diesel to achieve test presurelst 15 min TBG lost 19 psi IA lost 20 psi 2nd 15 min TBG lost 10 psi IA lost 10 psi Total TBG loss of 29 psi IA loss of 30 psi***PASS***SV/SSV=C MV=0 IA/OA=OTG TAGS hung on MV/IA Fluid anullus placard hung on MV Final WHP=290/288/-9. 01/22/15 SET HOLD OPEN SLEEVE AT 2078'SLM. 01/23/15 T/I/O=0/0/0, Temp=Sl. LDS drillout, pre Sidetrack. 1 LDS on TBG head is stuck, 1 LDS on CSG head is broken. DHD bled TIO to 0 psi, holding open bleed. Stung into IC test void (0 psi). Removed broken LDS, RU Wachs drill and drilled out remaining LDS nose. Tapped thread profile and installed new LDS assembly(new assembly is 1"longer than the original LDS). Stung into TBG hanger test void, bled to 0 psi. Removed stuck LDS,tapped thread profile and installed new LDS assembly. Cleaned up work area, will PT test voids in the AM. 01/23/15 T/I/O =290/290/vac.Temp=SI. Assist Cameron (Pre Sidetrack).T& IA FLs @ surface, OA FL near surface. Bled TP, IAP&OAP to 0 psi and held open bleed through out job. Job complete. Final WHPs= 0/0/0. SV, WV, SSV=C. MV=O. IA, OA=OTG. 18:30 hrs. 01/28/15 T/I/O =SSV/0/0,Temp: SI, PPPOT-T(PASS), PPPOT-IC (INCONCLUSIVE***Will need to be re-tested). Post LDS Drillout, pre Sidetrack. PPPOT-T: Stung into test void, (0 psi)void at 0 psi. Pumped through void, good returns. Pressured test void to 5,000 psi, pressure decreased to 4,200 psi in 5 minutes. Bled void to 0 psi and torqued LDS to 600 ft/lbs. Pressured test void back to 5,000 psi for 30 minute test. Lost 200 psi in 15 minutes, lost 50 psi in second 15 minutes. (PASS) Bled void to 0 psi. PPPOT-IC: Stung into test void, (0 psi)void at 0 psi. Pumped through void, good returns. Pressured test void to 3,500 psi, pressure decreased to 1,000 psi in 1 minute. Bled void to 0 psi and torqued LDS to 600 ft/lbs. Pressured test void back to 3,500 psi for 30 minute test. Lost 400 psi in 15 minutes. (FAIL) Bled void to 0 psi. 01/29/15 T/I/O=SSV/0/0,Temp:SI, PPPOT-IC (FAIL) Pre Sidetrack. PPPOT-IC: Stung into test void, (0+ psi) bled void to 0 psi. Pumped through void, good returns. Pressured test void to 3,500 psi for 30 minute test. Lost 450 psi in 15 minutes, lost 0 psi in second 15 minutes. (FAIL) LDS already at max torque. Bled void to 0 psi. Suggest LPE to verify where leak is going. Page 2 of 3 S 09-31C, Well History (Pre-Rig Sidetrack) Date Summary 02/01/15 T/I/O= SSV/0/0,Temp: SI, PPPOT-IC (PASS) Re-energize secondary seals. DHD held open bleed on IA and OA. PPPOT-IC: Stung into test void (0+psi) bled void to 0 psi. Opened SBS on test void to verify 0 psi and hold open bleed. Opened SBS on packing port to verify 0 psi. Removed 1" NPT pipe plug and RU packing gun. Pumped approx 1 J stick of plastic through void. Packed off test void to 3,500 psi. RD packing gun and install 1"NPT pipe plug. Pump through test void, good returns. Pressured test void to 3,500 psi for 30 minute test. Lost 50 psi in 15 minutes, lost 0 psi in second 15 minutes. (PASS) Bled void to 0 psi. 02/01/15 T/I/O=SSVNacNac.Temp=SI.Assist Cameron w/LPE. (Eval IA x OA communication). SV,WV&SSV =C. MV=O. IA&OA=OTG. NOVP. 12:30. 02/11/15 WHP T/I/O=0/0/0, Conduct PJSM w/crew, Barriers= IA/OA gate valves LTT***PASSED***RD blinds on IA and OA, RU 2"temp valves#32 and#30, TORQ'D L7 studs to API specs(253 ftlbs) PT'd 300 low, 3500 high. 02/12/15 T/I/O=VACNAC/0. Pumped up TBG to 250 psi. Set 5" ISA BPV#538 @ 114". Performed LTT on BPV (Failed). Pulled BPV#538 @ 114", pumped TBG back up to 250 psi. RDMO. FWHP =250/300/0. 02/13/15 T/I/O=250/250/0. Start barriers list= MVxSSV barriers from tubing. PPPOTxMV barriers from IA. RU CIW lubricator and tagged @ 135". Set 5" BPV ISA#537. Plug did not engage. Removed plug. RDMO. 02/14/15 T/I/O=80/80/0, Conduct PJSM w/crew, Barriers=master and SSV verified LTindependently, RU lubricator#840 w,BPV ISA#520,Tagged at 135", Failed LTT, Pulled BPV,RD Lubricator, RDMO Final WHP= 100/100/0. 02/15/15 WAIT ON SCAFFOLD. SCAFFOLD RIGGED UP. DRIFT TO 550'SLM W/3'x 1-7/8"STEM, 3.80" GAUGE RING. 02/15/15 T/I/O= 1135/10/vac Temp=shut in Assist SlickLine with Pressure Testing plug to 4000 psi. 02/16/15 Assist Slickline with Pressure Testing 4.5" EVO Bridge Plug to 4000 psi***Passed***Pumped 2.5 bbls of diesel to reach test pressure.TBG lost total of 149 psi. over 5 minute test. Hung Tags. Slickline in control well upon LRS departure. FWHP's 03/15/vac. 02/16/15 SET 4-1/2" EVO (P104422685-2) @ 500'SLM,TAG HUNG ON MASTER. LRS PT EVO TO 4010psi, LOST 149psi IN 5min, PASS(see Irs report). LRS BLEED BACK PRESSURE TO Opsi. 02/16/15 T/I/O=800/14/0, Conduct PJSM w/crew.Barriers= EVO down hole plug, MV. Install dry hole tree, RDMO. 02/19/15 T/I/O=0/ONac.Temp=SI. Re MIT-T to 4000 psi PASSED(Pre Sidetrack). No AL,flowline or wellhouse. Rig scaffolding set up around wellhead. No SSV on tree. Used .35 bbls DSL to increase TP form 6 to 4002 psi. On 2nd test, TP lost 39 psi in 1st 15 min, 19 psi in 2nd 15 min,for a total loss of 58 psi in 30 min. Bled TP to 0 psi (.35 bbls). Bled IAP to 0 psi.TP unchanged in 30 min. FWHPs=ONacNac. SV, MV=C. IA, OA=OTG. NOVP. 1500. Page 3 of 3 • I North America-ALASKA-BP Page 1 off Operation Summary Report Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date: X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time:7/2/1985 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292139600 Active datum:09-31 D actual @67.05usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/19/2015 18:00 - 20:00 2.00 RIGD P PRE RIG DOWN IN PREPARATION TO MOVE RIG -PIN FORUM CRANE -PREP RIG FOR MODULE SEPARATION -HOOK UP BRIDAL LINES -PREP RIG FLOOR TO L/D DERRICK -SECURE PIPE SHED -DISCONNECT INTERCONNECTS BETWEEN MODULES BEGIN RON EVENT AT 18:00 ON 02/19/15 WITH PARKER 273 RIG. 20:00 - 22:00 2.00 RIGD P PRE PJSM SKID FLOOR -MOVE ROOFTOP WALKWAYS -RIG DOWN MANRIDERS AND PREPARE RIG FLOOR -PREPARE PIPE BARN -PERFORM DERRICK INSPECTION -SKID RIG FLOOR INTO RIG MOVE POSITION. 22:00 - 23:00 1.00 RIGD P PRE PJSM TO LOWER DERRICK -WALKTHROUGH LOWER DERRICK CHECKLISTS LOWER DERRICK -FINAL SLACKOFF WEIGHT ABOVE DERRICK STAND=420 KLBS. 23:00 - 00:00 1.00 RIGD P PRE PREPARE TO SEPARATE MODULES -DISCONNECT FUEL,HYDRAULIC,ELECTRIC LINES -PREP TIRES -SWITCH OVER POWER 2/20/2015 00:00 - 03:00 3.00 RIGD P PRE PREPARE TO MOVE RIG FROM L-01ATO DS-09 -PREP MODULES FOR SEPARATION -WARM UP TIRES -SEPARATE MUD MOD FROM DRILL MOD AND STAGE DOWN PAD -SEPARATE DRILL MOD FROM UM AND STAGE DOWN PAD 03:00 - 06:00 3.00 RIGD P PRE MOVE UTILITY,DRILL,AND MUD MODULES (SIMULTANEOUSLY)FROM L PAD TO DS-09. -STAGE DRILL MODULE BY L PAD EXTENTION -REMOVE WELL HOUSE FROM L-01A WITH CRANE 1 -SEND WELLHOUSE TO DS 09-31 D 06:00 - 00:00 18.00 RIGD P PRE MOVE ALL MODULES FROM L PAD TO DS 09 -MOVE ALL THREE MODS SIMULTANEOUSLY -MOVE MODS ONTO SPINE ROAD AT 1100 HRS -STOP FOR TRAFFIC AND CREW CHANGE AT SANTA FE PAD AT 23:30 HRS 2/21/2015 00:00 - 06:00 6.00 RIGD P PRE MOVE ALL MODULES FROM L PAD TO DS 09 -MOVE ALL THREE MODS SIMULTANEOUSLY -MOVE MODS ON K PAD ACCESS -TURN ON TO WEST DOCK ROAD AT 03:30 HRS Printed 3/9/2015 10:54:19AM • • I North America-ALASKA-BP Page 2 oY�'L i" ✓� � Operation Summary Report Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date. X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time:7/2/1985 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292139600 Active datum:09-31 D actual @67.05usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 18:00 12.00 RIGD P PRE MOVE ALL MODULES FROM L PAD TO DS 09 -MOVE ALL THREE MODS SIMULTANEOUSLY -MOVE MODS DOWN WEST DOCK ROAD ISI-MOVE THROUGH DEADHORSE AND ONTO ICE ROAD NOTIFY AOGCC OF UPCOMING BOP TEST AT 1100 HRS 18:00 - 21:30 3.50 RIGD P PRE MOVE ALL MODULES FROM L PAD TO DS 09 MOVE ALL THREE MODS SIMULTANEOUSLY -ARRIVE ON DS 17 AT 1900 HRS -CONTINUE ON TO DS-09 21:30 - 00:00 2.50 RIGD P PRE MOVE ALL MODS TO DS-09 -STAGE MODULES ON DS-09 -MOVE ALL MODS ONTO BACK SIDE OF DS-09 BY 09-31 -TEST RIG MOVE ESD -PREPARE TO BACK DRILL MOD OVER 09-31 2/22/2015 00:00 - 01:00 1.00 RIGU P PRE RIG UP ONTO DS 09-31 -FLOW STATION 2 LOST SAFETY CRITICAL 'LINE OF SITE'COMMS WITH DRILL SITE -FACILITY TROUBLESHOOTING ISSUE DISCUSS WITH PAD OPERATOR AND FLOW STATION 2 CONTROL ROOM -BACK DRILL MOD OVER DS 09-31 -MOVE UTILITY MODULE INTO PLACE -MOVE MUD MODULE INTO PLACE -RAISE DRIVING CABS. COMMS ISSUES STILL PRESENT BETWEEN DRILL SITE AND FACILITY 01:00 - 11:00 10.00 RIGU 1 N WAIT 6.65 PRE DISCUSS OPTIONS WITH PAD OP,CONTROL ROOM,DRILLING SUPERINTENDANT FACILITY OTL REQUESTS THAT RIG STAND BY UNTIL TECHNICAL ADJUSTMENTS TO COMMUNICATIONS DISHES CAN BE ATTEMPTED 11:00 - 12:30 1.50 RIGU P 6.65 PRE APPROVAL FROM FACILITY LEADERSHIP TO BEGIN RIG-UP PROCESS PJSM RAISE DERRICK AND CONTINUE RIG UP -RAISE DERRICK,LIFT OFF HEADACHE AT 530K,MAX PULL 540K -SKID RIG FLOOR RAISE PIPE CAT -RIG UP INTERCONNECTS -CONNECT STEAM,ELECTRICAL PLUG BOARD,ROOF AND FLOOR PANELS 12:30 - 14:00 1.50 RIGU P 6.65 PRE RIG UP RAISE PIPE CAT -RIG UP INTERCONNECTS -CONNECT STEAM,ELECTRICAL PLUG BOARD,ROOF AND FLOOR PANELS Printed 3/9/2015 10:54 19AM North America-ALASKA-BP Page 3fei .r..,., Operation Summary Report Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date: X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time.7/2/1985 12:00.00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UW:500292139600 Active datum:09-31 D actual @67.05usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) _._I (usft) 14:00 - 21:30 7.50 I RIGU P 6.65 PRE BRIDLE DOWN,HANG&TIE BACK BRIDLE LINES -INSTALL MOUSE HOLES -HANG RIG TONGS -INSTALL MUD LINES&CEMENT LINES TO RIG FLOOR -TAKE ON SEAWATER CALIBRATE TOTCO PIT LEVEL SENSORS PJSM INSTALL PIPE WIPER SYSTEM IN FLOW BOX -REVEIW L2RA WITH WELDER AND FIREWATCH 21 30 - 00:00 2.50 RIGU P 6.65 PRE INSTALL ROOFTOP WALKWAYS -BUILD HANDRAILAND WALKWAY FROM DRILL MOD TO WELL HOUSE -RIG UP SECONDARY KILL LINE TO IA - RIG UP&PT HARDLINE TO OPEN TOP TANK -CHANGE UPPER RAMS FROM 2-7/8"X 5-1/2" VBRS TO 7"FIXED -OPEN RAM DOORS AND INSPECT ALL RAMS 2/23/2015 00:00 - 01:30 1.50 DHB P DECOMP **ACCEPT PARKER 273 ON DS 09-31D AT 00:01 HRS 02-23-2015** PJSM PRESSURE TEST DOWNHOLE PLUG -PT PLUG FROM BELOW 250 PSI LOW AND 500 PSI HIGH FOR 5 CHARTED MINS EACH -BLEED OFF PRESSURE 01:30 - 02:00 0.50 DHB P DECOMP HOLD RIG EVAC DRILL WITH LYLE BUCKLER CREW -MR WITH RIG CREW 02:00 - 05:00 3.00 DHB P DECOMP PJSM WITH CAMERON TO BLEED CONTROL LINES -CONFIRM 0 PSI ON TBG AND IA -CAMERON BLEED OFF CONTROL LINES MONTIOR TBG,IAAND CONTROL LINES FOR { 1 HR 05:00 - 06:30 1.50 DHB N SFAL DECOMP PJSM NIPPLE DOWN TREE -PREPARE TO N/D TREE 1-TREE CAP GAUGE SHOWS PRESSURE -DETERMINE MASTER VALVE TO BE PRESSURE LOCKED -CALL GREASE CREW TO VERIFY VALVES ARE FUNCTIONING PROPERLY GREASE CREW FUNCTION MASTER VALVE AND ENSURE IT IS OPEN 06:30 - 07:00 0.50 DHB P DECOMP RE-TEST DOWNHOLE PLUG -PT PLUG FROM BELOW 250 PSI LOW AND 500 PSI HIGH FOR 5 CHARTED MINS EACH CONFIRM 0 PSI ON TUBING DURING TEST -BLEED OFF PRESSURE 07:00 - 10:00 3.00 WHSUR P DECOMP PJSM NIPPLE DOWN 5-1/8"MCEVOY 5M TREE AND 11"X 5-1/8"ADAPTER -CAMERON REP AND WSL INSPECT HANGER THREADS THREADS DETERMINED TO BE IN POOR CONDITION SPEAR WILL NEED TO BE USED TO PULL HANGER ISA BLANKING PLUG WILL NOT THREAD INTO PROFILE Printed 3/9/2015 10:54:19AM s • i • North America-ALASKA-BP Page 4 P Operation Summary Report AFF; Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date: X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time:7/2/1985 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292139600 Active datum:09-31 D actual @67.05usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 18:30 8.50 BOPSUR P DECOMP PJSM NIPPLE UP 13-5/8"5 M BOP -N/U HIGH PRESSURE RISER -N/U BOP -INFLATE AIR BOOTS FOR BELL NIPPLE AND FLOW LINE -ENERGIZE ACCUMULATOR -BUILD 5"DONUT TEST JOINT FLUID PACK BOP&CHOKE _BLEED AIR FROM LINES 18:30 - 00:00 5.50 BOPSUR P DECOMP PJSM,TEST 13-5/8",4 PREVENTER BOP AND RELATED EQUIPMENT -UTILIZE PRESSURE CROSSCHECK LIST PRIOR TO TESTING -TEST BOP ACCORDING TO AOGCC,BP REGULATIONS AND PARKER PROCEDURES TEST AGAINST DOWNHOLE PLUG SET AT 500 FT -TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH,5 MINS CHARTED 2/24/2015 00:00 - 04:30 4.50 BOPSUR P DECOMP FINALIZE TESTING OF BOP -TEST UPPER FIXED RAMS WITH 7"TEST JOINT -TEST LOWER VBRS WITH 4"&5"TEST JOINT -TEST BLIND RAMS -TEST HCR KILL AND CHOKE -PERFORM ACCUMULATOR DRAWDOWN TEST PRESSURE TEST BOP AND EQUIPMENT 250 PSI LOW TO 4000 PSI HIGH TEST FOR 5 CHARTED MINS EACH PASSING TESTS IAAND OA:0 PSI THROUGHOUT TEST PERIOD BLOW DOWN LINES AND RIG DOWN TEST EQUIPMENT -SEE ATTACHED DOCUMENTATION BOB NOBLE OF AOGCC WAS WITNESS TO BOP TEST 04:30 - 05.00 0.50 DHB C DECOMP PJSM,RIG UP DUTCH RISER -RIG UP DUTCH RISER FOR SLICKLINE -PREPARE TO PULL DOWN HOLE PLUG AT 500 FT 05:00 - 11:00 6.00 DHB C DECOMP PJSM WITH SLB TO RIG UP SLICKLINE BRING SLICKLINE TOOL AND PRERSSURE CONTROL EQUIPMENT TO RIG FLOOR -RIG UP SLICKLINE PRESSURE CONTROL EQUIPMENT -MAKE UP TOOL PER SLB -PRESSURE TEST DUTCH RISER,QUICK TEST SUB(QTS),SLICKLINE LUBRICATOR AND BOP BODY PT AGAINST DOWNHOLE PLUG AT 500 FT PT 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINS Printed 3/9/2015 10.54.19AM North America-ALASKA-BP Page 51=416 • Operation Summary Report ""; n Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time:7/2/1985 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292139600 Active datum:09-31 D actual @67.05usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 13:30 2.50 DHB C DECOMP SLICKLINE RETREIVE DOWN HOLE PLUG -RIH WITH GS SPEAR&EQUALIZE PLUG POOH,BREAK OFF AT QTS,RE-PIN GS TOOL M/U TOOL AND TEST AT QTS 3500 PSI FOR 5 MINS -RUN IN HOLE AND RETREIVE PLUG 13:30 - 15:30 2.00 DHB C DECOMP PJSM RIG DOWN SLICKLINE LAY DOWN TOOLS&PLUG RIG DOWN QTS,BOP,AND LUBRICATOR -SEND EQUIPMENT OFF RIG FLOOR 15 30 - 21:00 5.50 PULL P DECOMP PJSM CIRCULATE OUT DIESEL FREEZE PROTECT -VERIFY VALVE LINE UP -PRESSURE TEST LINE FROM IA TO FLOW BACK TANK 250 PSI LOWAND 3500 PSI HIGH, 5 MINS EACH -CLOSE BLIND RAMS -PUMP 50 BBL SEWATER,25 BBLS DEEPCLEAN PILL,325 BBL SEAWATER PUMP DOWN TBG,RETURNS UP IA TO FLOW BACK TANK RATE:6 BPM,435 PSI BLOW DOWN/RIG DOWN SURFACE LINES -MONTIOR WELL, WELL IS STATIC !;""SIMOPS:RIG UP DAYON CASING TONGS& SLB SPOOLER** 21:00 - 23:30 2.50 PULL P DECOMP PJSM PULL 10"X 5-1/2"MCEVOY TUBING HANGER -MAKE UP SPEAR PER BOT REP -DRAIN STACK -RUN IN HOLE AND ENGAGE SPEAR IN TUBING HANGER -CAMERON BACK OUT LOCK DOWN SCREWS -PULL HANGER OFF SEAT AT 80K LBS (INCLUDING 35K TOP DRIVE) -PULL SPEAR&HANGER TO RIG FLOOR -MONITOR WELL FOR 10 MINUTES AFTER PULLING HANGER TO RIG FLOOR,WELL STATIC -LAY DOWN HANGER AND SPEAR ASSEMBLY 23:30 - 00:00 0.50 PULL P DECOMP RIG SERVICE -LUBRICATE RIG 1-GREASE BLOCKS,TOP DRIVE,IDM 2/25/2015 00:00 - 02:00 2.00 PULL P DECOMP CIRCULATE BOTTOMS UP DIESEL STILL PRESENT IN TBG AND ANNULUS PUMP SURFACE TO SURFACE CIRCULATE DOWN TBG,RETURNS UP IA TO FLOW BACK TANK RATE:6 BPM,335 PSI MONITOR WELL FOR 10 MIN:STATIC -CHANGE OUT 5"ELEVATORS TO 4 1/2"YC ELEVATORS Printed 3/9/2015 10.54:19AM Operation Summary Report Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date: X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time'7/2/1985 12.00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292139600 Active datum.09-31D actual @67.05usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 06:00 4.00 PULL P DECOMP POOH WITH 4-1/2"12.6# 13CR TUBING -LAY DOWN 1 X 1 IN PIPE SHED -POOH FROM 3715'MD TO-2100'MD P/U:52KAT 2100 FT SPOOL CONTROL LINE WITH SLB SPOOLER AT 2100 FT DISCONNECT CONTROL LINE FROM SSSV LAY DOWN SSSV RECOVER 51 STAINLESS STEEL BANDS REMOVE CONTROL LINE SPOOLER FROM RIG FLOOR UTILIZE AIR TOOL TO TAKE OFF CONTROL LINE BANDS MONITOR TRIP VIA TRIP TANK-PROPER DISPLACEMENT 06:00 - 0730 1.50 PULL P DECOMP POOH WITH 4-1/2"12.6# 13CR TUBING -LAY DOWN 1 X 1 IN PIPE SHED -POOH FROM 2,100'MD TO SURFACE MONITOR TRIP VIA TRIP TANK-PROPER DISPLACEMENT 92 FULL JOINTS RECOVERED -4 PUP JOINTS RECOVERED 1 SSSV AND 2 FLOW COUPLINGS -RECOVERED -1 GLM RECOVERED -CUT JOINT=4.09' -TUBING IN GOOD CONDITION 07:30 - 09:00 1.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -RIG DOWN CASING TONGS AND SEND OFF FLOOR CHANGE OUT YC ELEVATORS FOR BX ELEVATORS -CLEAN AND CLEAR RIG FLOOR -STAGE CLEAN OUT ASSEMBLY TO RIG ,FLOOR 09.00 - 12:00 3.00 CLEAN P DECOMP PJSM MAKE UP 9-5/8"CLEAN OUT ASSEMBLY BHA#1 -MAKE UP ASSEMBLY PER BOT REP -RIH WITH BHA -8-1/2"MILL TOOTH BIT,BIT SUB WITH FLOAT ,(2)8-1/2"WATERMELON MILL,6-1/4" BUMPER SUB,(9)6-1/2"DRILL COLLARS,(15) 5"HWDP,X/O SUB PU:86K,SO:82K -OAL OF BHA =779.25" 112:00 - 16:30 4.50 CLEAN P DECOMP RUN IN HOLE WITH 9-5/8"CLEAN OUT ASSEMBLY -RIH ON ELEVATORS RIH WITH 4"DP,1X 1 FROM PIPE SHED -BREAK CIRCULATION EVERY 15 STANDS PUMP 210 GPM @ 125 PSI TAG 4-1/2"STUB AT 3,733'MD 16:30 - 18:00 1.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP -CIRCULATE SWEEP SURFACE TO SURFACE CLEAN RETURNS PUMP AT 650 GPM&1380 PSI MONITOR WELL 10 MINS PRIOR TO POOH WELL IS STATIC Printed 3/9/2015 10:54:19AM North America ALASKA BP Page 7.oi Operation Summary Report'- Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:2/19/2015 End Date. X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time:7/2/1985 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292139600 Active datum:09-31 D actual @67.05usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:00 2.00 CLEAN P DECOMP PULL OUT OF HOLE WITH CLEAN OUT ASSEMBLY -POH ON ELEVATORS FROM 3,733 TO-780' MD -STAND BACK 4"DP IN DERRICK -MUD WEIGHT IN&OUT=8.5 PPG MONITOR WELL 10 MINS PRIOR TO PULLING BHA THROUGH STACK 20:00 - 21 30 1.50 CLEAN P DECOMP PJSM WITH BOT,LAY DOWN CLEANOUT ASSEMBLY -BREAK OUT MILL MAKEUP STARTER WINDOW MILL AND WATERMELON MILLS FOR NEXT RUN M/U TO LOWER WATERMELON MILLS FROM CLEAN OUT RUN -LAY DOWN IN PIPE SHED 8-1/2"MILLS IN GAUGE,NO SIGNS OF WEAR 21:30 - 22:00 0.50 CLEAN P DECOMP RIG SERVICE CLEAN AND CLEAR RIG FLOOR GREASE ST-80,IDM,BLOCKS,AND TOP DRIVE 22:00 - 00:00 2.00 STWHIP P DECOMP PJSM RIG UP HES E-LINE&EZSV RIG UP E-LINE SHEAVES AND BRING TOOLS TO RIG FLOOR -MAKE UP TOOLS PER HES -RUN IN HOLE WITH EZSV 2/26/2015 00:00 - 01:00 1.00 STWHIP_ P DECOMP RIH AND SET HES 9 5/8"EZSV(7.75"OD) -RIH WITH EZSV/GR/CCL ON E-LINE FROM SURFACE TO 3630'ELMD -LOG FROM 3630'TO 3150' -RIH TO 3516'MD AND PUT EZSV TOP ON DEPTH AT 3530'MD,5'ABOVE COLLAR -E-LINE SET EZSV, WEIGHT INDICATOR DROPPED FROM 1015 LBS TO 867 LBS INDICATING PLUG SET AND RELEASED. -SET TOP OF EZSV AT 3,530'MD I-BOTTOM OF EZSV AT 3,533'MD -PULL OUT OF HOLE AND LAY DOWN E-LINE TOOLS ON RIG FLOOR 01:00 - 02:00 1.00 STWHIP P DECOMP PRESSURE TEST 9-5/8"CASING AGAINST EZSV -MIT CASING AGAINST EZSV AT 3,530'MD -CONFIRM VALVE ALIGNMENT PRIOR TO TEST -PUMPED 45 STKS(4.2 BBLS)TO 4100 PSI FOR 30 CHARTED MINUTES. -30 PSI LOST IN 1ST 15 MINS -0 PSI LOST IN 2ND 15 MINS -MIT MEETS BP STP CRT-AK-10-45 CRITERIA -BLEED OFF PRESSURE,BLED BACK 4 BBLS -MONITOR WELL,WELL IS STATIC 02:00 - 02:30 0.50 STWHIP P DECOMP PJSM RIG DOWN E LINE -MOBILIZE ELINE FROM RIG FLOOR Printed 3/9/2015 10:54:19AM • North America-ALASKA-BP Page 8 ay Operation Summary Report rF Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date: X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time:7/2/1985 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292139600 Active datum:09-31 D actual @67.05usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 06:00 3.50 WHSUR P DECOMP PJSM NIPPLE DOWN BOP AND REPLACE TUBING SPOOL -DRAIN STACK 1-LAY DOWN MOUSE HOLE -N/D BELL NIPPLE -SET BACK RISER AND BOP STACK -N/D TUBING SPOOL&CHANGE PACKOFF -PER CAMERON REP **BARRIERS FOR BREAKING CONTAINMENT& PACKOFF CHANGEOUT** -PRESSURE TESTED CEMENT PLUG -PRESSURE TESTED EZSV -KILL WEIGHT FLUID-8.5-PPG SEAWATER -MONITORED OUTER ANNULUS WITH 0 PSI, SINCE 0200 HRS,2-23-15. *SIMOPS BUILD 4"DP STANDS OFFLINE 06:00 - 10:00 4.00 WHSUR P DECOMP NIPPLE UP NEWTUBING SPOOL&BOP NIPPLE UP NEW MCEVOY SSH TUBING ;SPOOL -INSTALL SECOND ANNULUS VALVE ON TUBING SPOOL MAKE UP MOUSEHOLE CAMERON TEST 9 5/8"PACKOFF TO 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 30 MIN *SIMOPS BUILD 4"DP STANDS OFFLINE 10:00 - 13:00 3.00 BOPSUR P DECOMP PRESSURE TEST BOP SERVICE BREAK AND TUBING SPOOL -R/U TEST PLUG -N/U RISER AND BOP -FILL STACK AND REMOVE AIR FROM LINES -TEST BOP BREAK,TUBING SPOOLAND SECONDARY ANNULUS VALVE -PT 250 PSI LOW AND 4000 PSI HIGH FOR 5 CHARTED MINUTES -PASSING TEST 13:00 - 14:30 1.50 WHSUR P DECOMP PREPARE FOR MAKING UP WINDOW MILLING BHA -PULL TEST PLUG -SET WEAR RING:12.25"ID -MOBILIZE BHA COMPONENTS TO RIG FLOOR 14:30 - 17:00 2.50 STWHIP P WEXIT MAKE UP BAKER WHIPSTOCK ASSEMBLY -MAKEUP 9-5/8"GEN II 3-STRING MILL AND WINDOW MILL ASSEMBLY -CONFIRM ANCHOR SET FOR 18 KLBS SHEAR AND REMOVAL OF SHIPPING PIN -BOT REP AND SLB DD ON RIG FLOOR -ORIENT UBHO WITH WHIPSTOCK HIGHSIDE AND CONFIRM GYRO DATA TOOL PROPERLY ORIENTED -M/U 9 X 6 1/2"DRILL COLLARS -M/U 2 JOINTS OF 5"HWDP -OVERALL BHA LENGTH=864.18'MD Printed 3/9/2015 10:54:19AM North America-ALASKA-BP a Page 9,p417 Operation Summary Report Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date: X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:PARKER 273 Spud Date/Time:7/2/1985 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. i UWI:500292139600 Active datum:09-31 D actual @67.05usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 19:00 2.00 STWHIP P WEXIT RUN IN HOLE WITH 9-5/8"WHIPSTOCK/MILL ASSEMBLY -RIH FROM 829'MD TO 3,505'MD -PU 130 K,SO 126 KAT 2,726'MD -RIH ON 4"DP FROM DERRICK -FILL PIPE EVERY 15 STANDS -MONITOR TRIP VIA TRIP TANK-PROPER DISPLACEMENT 19:00 - 21:00 2.00 STWHIP P WEXIT PJSM ORIENT AND SET WHIPSTOCK -RIG UP WIRELINE AND GYRO -ORIENT WHIPSTOCK TO 326 DEGREES -POOH WITH GYRO AND SURVEY EVERY 100' MD -RIG DOWN FOES WIRELINE 21:00 - 21:30 0.50 STWHIP P WEXIT SET WHIPSTOCK -RIH TO 3,527'MD AND TAG EZSV PU 128K,SO 124 K -SET WHIPSTOCK PER BAKER REP S/O 18KTO SET ANCHOR -P/U 15K OVER STRING WEIGHT TO CONFIRM ANCHOR SET -S/O 49K AND SHEAR WINDOW MILL OFF OF SLIDE 21:30 - 22:30 1.00 STWHIP P WEXIT PJSM DISPLACE WELL FROM 8.5 PPG SEAWATER TO 9.5 PPG LSND -DISPLACE WELL TO 9.5 PPG LSND -610 GPM,690 PSI -RECORD SLOW PUMP RATES WITH NEW BHAAND NEW MUD 22:30 - 23:30 1.00 STWHIP P WEXIT KICKOFF DS 09-31C SIDETRACKAND MILL SA-04‘,1' WINDOW -MILL WINDOW IN 9-5/8"CASING WITH 8-1/2" I�QI it MILLING ASSEMBLY I J 1/ -MILL FROM 3,505'MD TO 3,508'MD -513 GPM,845 PSI,90 RPM,2 KFT-LBS TORQUE ON BOTTOM, 1 KFT-LBS TORQUE OFF,2-5 KLBS WOB,120K ROT WT -MONITOR DITCH MAGNETS 23:30 - 00:00 0.50 STWHIP P WEXIT RIG SERVICE CLEAN AND CLEAR RIG FLOOR GREASE ST-80,IDM,BLOCKS,AND TOP DRIVE Printed 3/9/2015 10:54:19AM Operation Summary Common Well Name:09-31 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/19/2015 End Date: X3-013XD-C:(10,093,450.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No..PARKER 273 Spud Date/Time:7/2/1985 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292139600 Active datum:09-31 D actual©67.05usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/27/2015 00:00 04:00 4.00 STMILL P WEXIT KICKOFF DS 09-31C SIDETRACKAND MILL WINDOW MILL WINDOW IN 9-5/8"CASING WITH 8-1/2" MILLING ASSEMBLY -MILL F 3, ' T 3, ' -DRILLADDITIONAL50820'O OF NEW5228-1 " L TO ENSURE TOP WATERMELONMD MMDILL/2PASSES THROUGHROM WINDOW -513 GPM,845 PSI,90 RPM,52K KFT-LBS TORQUE ON BOTTOM, 1 KFT-LBS TORQUE OFF,2- LBS WOB,120K ROT WT -WORK MILLS THROUGH WINDOW MULTIPLE TIMES TO ENSURE SMOOTH WINDOW -NO DRAG THROUGH WINDOW WITH PUMPS OFF AND NO ROTATION 1-MONITOR DITCH MAGNETS PUMP 30 BBL HIGH VIS SWEEP ET INCONSISTENT RETURNS THROAMOUNTUGHOOFUTMER ATI SHAVINGS OPERATIONS MINIMAL INCREASE IN CUTTINGS RETURNED FROM SWEEP TOP OF WINDOW=3,505'MD,3,505'TVD MIDDLE WINDOW=3,514'MD, 3,,514'TVD BOTTOM WINDOW=3,522'MD, 3,522'TVD 04:00 - 05:30 1.50 STMILL P WEXIT CIRCULATE HOLE CLEAN -CIRCULATE 2 BOTTOMS UP. {-510 GPM,842 PSI RUATU -PULLCICINTOLE WINDOWNTIL ANDRETURNS FLOWCHECKARECLEAN WELL PRIOR TO POOH 05:30 - 07:30 2.00 STMILL P WEXIT PULL OUT OF THE HOLE WITH 8 1/2"MILLING ASSEMBLY -POOH ON ELEVATORS FROM 3,505'MD TO 841'MD POOH STANDING BACK4"DP IN DERRICK -MONITOR TRIP VIA TRIP TANK:PROPER DISPLACEMENT FLOW CHECK WELL PRIOR TO PULLING BHA INTO STACK,WELL IS STATIC 07:30 09:30 2.00 STMILL P WEXIT PJSM Y DOWN 8-1/2" G STAND BACK 5"HWDP -LAY DOWN ALL 9 DRILLMILLINCOLLARS BHA -LAY DOWN MILLING ASSEMBLY PER BAKER CLEAN AND CLEAR RIG FLOOR OF BOT MILLS AND HANDLING TOOLS ALL MILLS IN GAUGE,NO EXCESSIVE WEAR NOTED 09:30 - 10:30 1.00 BOPSUR P WEXIT _PJSM FLUSH BOPS M/U STACK FLUSHING TOOL -WASH AND JET BOPS DOWN PAST WELLHEAD FUNCTION BOPS -REFLUSH BOP STACK -CLEAN DITCH MAGNETS Printed 3/9/2015 10:54:19AM 1 ' 1/8"McEV©Y w 09-31 C NOTES:H2S READINGS AVERAGE 125 ppm VVELLFEAD MtEVOYON M"*" WELL ANGLE>70'@ 9210'""4-12" ACTUATOR AXELSON CHROME TBG&7"LNR" OKB ELEV .. .5d 20"CONDUCTOR --{ ? xI BF.ELEV= 23 0' . / #, KOP= 4400' — Max Angle= 96"@ 9694' D= - Datum MD= 952T 13-3/8"CSG,72#, -{ 69' Datum TVD= 8800'SS K-55,D=12,347" 13-3/8'CSG,72#,L-80 BUTT,D=12.347' —I 2533' 9-58"GEN I WI-ISTOCK(02/26/15)— 3505' 9-5/8'CSG MLLOUT WINDOW(09-310) 3505'-352T 9-5/8"BKR EZSV(02/25/15) --( 3530' 412CRI "TBG T(01/21/15) 3715' J GAS LIFT MANLS _ ST MD TVD DEV TYPE VLV LATO-I FORT DATE Minimum ID = 3.812" @ 2096' . 2 4802 4786 18 TGPD DMY FE 0 10127/05 4-112" T R S S S V 3 5605 5535 23 TGPD DMY FE 0 03/31/96 /± J 4 6178 6063 23 TGFD DMY RK 0 05/23/95 5 6704 6548 23 TGPD DMY RK 0 03/31/96 BKR 0-2 TIEBACK SLV,D=7.50" — 8234' 6 7236 7038 22 TGPD DMY RK 0 04/22/93 9-5/8'X r BKR FKR&LNR HGR,ID=6.190" — 8241' ,crr r� 7 7765 7530 21 TGR) DMY FIC 0 04/22/93 1,, ► 8 8059 7' 6 19 TGPD DMY FIC 0 04/22/93 ESTNAATID TOP OF CEMENT(01/19/15) — 7039'Am �' 9 8202 7942 18 TGPD DMY F3( 0 05/23/95 I 9-5/8'CSG,47#,L-80 BTC,D=8.681" —1 8400' f #. f TUBNG PUNCH(01/11/15) — 8717'-8727 A' -6 8757' —4-1/2"SWNP,ID S N , =3.813' A .. 8774' —17"X 41/2"BKR SABL-3 PKR D=3.875" 9-5/B'CSG MLLOUT WNDOW(09-31A) 8400'-8450' -NS ' 8816' J-14-1/2"DEPLOY Sly,D=3.00 8827 —13-1/2"X 2-718-LNR XO,D=2.38r R li il 4-1/2"TBG, 12.6#,13CR NSCT, -1 8847 If 8832' 4112"SINS NP,D=3.813" 0152 bpf,D=3.958' i Vs 1 8843' --{412"MEG,3.958" 7"LNR,29#,13CR-80 NSCC, — -.9060 ,. 8850' BMD TT LOGGED 07/08/94 .0371 bpf, D=6.184' — 8927 /14-12"BKR CEP(01/10/15) R32FORATION SUMMARY II r LNR MLLOUT WNDOW(09-31C)9060'-9066' REF LOG:SF'F3NRY-SUN MAO LOG ON 04/27/96 I� - ...,IA ANGLE AT TOP Pte:30"@8972 j v Note:Refer to Roduction DB for historical perf data SIZE SFF INTERVAL Opn/Sgz SHOT S07 r 6 8972-8982 C 1124/01 ' r 6 8987-8999 C 11/24/01 , ✓ 6 9094 9104 C 10/16/01 1 9170' 2-7/8"CIBP(10/16/01) 7 6 9100-9114 C 11/28/06 ✓ 6 9132-9142 C 11/28/06 ' 9390'elm _12-718"CSP(0725/00) 2-1/8' 4 9206-9226 C 10/16/01 2-1/8' 4 9236-9254 C 10/16/01 ISO 9489' _I2-7/8'CEP(0528/98) ✓ 4 9267-9287 C 10/16/01 go 2-1/8" 4 9710-9785 C 0528/98 10000'ctm —12-78"CEP(02/04/97) 2-1/8" 4 10250-10325 C 02/04/97 go2-1/8" 4 10775-10875 C 10/12/96 10531'elm —12-7/8"CUP(10/12/96) ii-..„ I i10800' -FISH-2-1/8"CEP (LOST 9-25-96) PBTD —1 10882 2-7/8"LNR,6.5#,L80,.0058 bpi,D=2.38r -{ 10946' DATE REV BY CXM E NTS DATE REV BY COMENTS FRUDHOE BAY UNIT 08/07185 RWN 35 IMTIAL COMPLETION 01/19/15 ?/PJC ESA WELL- 09-31C 05/28186 WW1 RECOMPLET1ON 01/21/15 JCW PJC JET CUT PERMIT No: 1960640 04/21/93 WES SIDETRACK(09-31A) 02/25/15 PJC SET EZSV API No: 50-029-21396-03 08/06194 CTU CTD SIDETRACK(09-318) 02/26/15 PJC SET WI-FSTOCK SEC 2,T1ON,R15E, 1587'FS/&998'FW 04/28/96 NES3 CTD SIDETRACK(09-31C) 02/27/15 PJC MLLOUT V'$tDOW 001/11/15 JCMY PJC TUBIC PUNCH 03/24/15 PJC TBG RJNCHI CMT CORRECTIONS BP EkploratIon(Alaska) Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. / ~ "~)~ ¢ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages' Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by:B~ Dianna Vincent Nathan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is/ • p BP Exploration (Alaska) Inc. 4 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 r4 Anchorage, Alaska 99519 -6612 December 30, 2011 C ., 0 64/" Mr. Tom Maunder Alaska Oil and Gas Conservation Commission I -. 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of DS -09 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from DS -09 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) DS-09 1012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft gal 09-01 1750760 50029201880000 Sealed conductor NA NA NA NA NA 09-02 1760160 50029201980000 Sealed conductor NA NA NA NA NA 09-03 1760350 50029202090000 Sealed conductor NA NA NA NA NA 09-04A 1930240 50029202120100 Sealed conductor NA NA NA NA NA 09-05A 1930260 50029202150100 Sealed conductor NA NA NA NA NA 09-06 1760480 50029202160000 Sealed conductor NA NA NA NA NA 09-07A 1990220 50029202230100 Sealed conductor NA NA NA NA NA 09-08 1760700 50029202300000 Sealed conductor NA NA NA NA NA 09-09 , 1760760 50029202320000 Sealed conductor NA NA NA NA NA 09 -10 1760820 50029202350000 Sealed conductor NA NA NA NA NA 09-11 1760840 50029202360000 0.7 NA 0.7 NA 3.4 7/17/2010 09-12 1770070 50029202390000 Sealed conductor NA NA NA NA NA 09-13 1770080 50029202400000 Sealed conductor NA NA NA NA NA 09-14 1770250 50029202490000 Sealed conductor NA NA NA NA NA 09-15A 2070220 50029202560100 Sealed conductor NA NA NA NA NA 09-16 1770370 50029202570000 Sealed conductor NA NA NA NA NA 09-17 1770380 50029202580000 Sealed conductor NA NA NA NA NA 09-18 1770390 50029202590000 Tanko conductor NA NA NA NA NA 09 -19 1770400 50029202600000 Sealed conductor NA NA NA NA NA 09-20 1770410 50029202610000 Sealed conductor NA NA NA NA NA 09 -21 1831600 50029210360000 2.5 NA 2.5 NA 25.5 7/17/2010 09-22 1831730 50029210490000 6.7 NA 6.7 NA 42.5 7/82010 09-23 1980440 50029210667100 2.2 NA 2.2 NA 15.3 7/8/2010 09-24 1852020 50029214280000 Dust Cover NA NA NA 9.4 10/20/2011 09 -25 1840280 50029210830000 3.2 NA 3.2 NA 23.0 7/8/2010 09 -26 1840370 50029210910000 0.3 NA 0.3 NA 1.7 7/8/2010 09 -27 1850280 50029212910000 Dust Cover NA NA NA 6.8 1020/2011 09-28A 1930430 50029212920100 Dust Cover NA NA NA NA NA 09 -29 1850960 50029214220000 13.5 3.0 0.5 7/13/2011 11.9 1020/2011 09-30 1851840 50029214117000 Dust Cover NA NA NA 8.5 1020/2011 -OP 09-31C 1960640 50029213960300 0.2 NA 02 NA 1.7 7272010 09-32 1851180 50029213710000 Sealed conductor NA NA NA N/A NA 09-33A 2081560 50029213650100 9.3 NA 9.3 'NA 66.3 7/18/2010 09-34A 1932010 50029213290100 Sealed conductor NA NA NA N/A NA 09-35A 1930310 50029213140100 2.0 NA 2 NA 17.0 7/27/2010 09-36C 1951140 50029214290300 Dust Cover NA NA NA 9.4 10/20/2011 09-37 1940280 50029224510000 Open Flutes NA 0 NA 3.4 10/20/2011 09-38 1890210 50029219190000 0.1 NA 0.1 NA 6.8 10/20/2011 09-39 1910120 50029221330000 1.2 NA 12 NA 11.9 7/17/2010 09-40 1901690 50029221180000 1.3 NA 1.3 NA 10.2 7/17/2010 09-41 1900740 50029220540000 Dust Cover NA NA NA N/A NA 09-42A 1990070 500292205901 SC Leak 09-43 1901070 50029220780000 11.3 6.0 1.0 7/13/2011 8.5 7/18/2011 09-44A 2091570 50029220870100 1.5 NA 1.5 NA 10.2 9/10/2010 09-45 1901150 50029220830000 0.2 NA 0.2 NA 3.4 10202011 09-46 1901330 50029220920000 1.5 NA 1.5 NA 102 7/182010 09-47 1901460 50029220980000 1.3 NA 1.3 NA 6.8 7/182010 09-48 1910040 50029221280000 1.3 NA 1.3 NA 6.8 7/182010 09-49 1921340 50029223170000 0.7 NA 0.7 NA 2.6 10/20/2011 09-50 1921490 50029223250000 Dust Cover NA NA NA 4.3 10/20/2011 09-51 _ 1921410 50029223200000 Dust Cover NA NA NA 3.4 10/20/2011 AOGCC MITIA Forms for 03-31760600), 03-12 (1790580), 03-37 (20390), 04-10 (... Page 1 of 1 Maunder, Thomas E (DOA) From: AK, D&C Well Integrity Coordinator [AKDCWeIIlntegrityCoordinator@bp.com) Sent: Thursday, July 01, 2010 5:06 PM To: AK, D&C Well Integrity Coordinator Cc: Regg, James B (DOA); Maunder, Thomas E (DOA); Brooks, Phoebe L (DOA); AK, D&C Well Integrity Coordinator Subject: AOGCC MITIA Forms for 03-36 (1760600), 03-12 (1790580), 03-37 (2091390), 04-10 (1760420), 04-43 (1940130),04-44 (1940100),09-16 (1770370),09-19 (1770400), 09-31C (1960640), 09-36C (1951140), 09-37 (1940280) Attachments: June 2010 MIT Forms GPB part 1.zip Jim, Tom and Phoebe, Please find the attached AOGCC MITIA forms for the following wells: 03-06 (PTD #1760600) 03-12 (PTD #1790580) -enclosed are 2 tests; original test from 6/12 /2010 and retest on 6/29/2010. 03-37 (PTD #2091390) 04-10 (PTD #1760420) 04-43 (PTD #1940130) 04-44 (PTD #1940100) 09-16 (PTD #1770370) 09-19 (PTD #1770400 09-31 C PTD #1960640 `~'i' ~ ~,,,~ r ; 09-36C (PTD #1951140) 09-37 (PTD #1940280) «June 2010 MIT Forms GPB part 1.zip» Thank you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907) 659-5102 Ceil (907) 752-0755 Pager (907) 659-5100 Ext. 1154 7/2/2010 ~ i OPERATOR: FIELD /UNIT /PAD: DATE: OPERATOR REP: AOGCC REP: Email to:jim.regg@alaska.gov; phoebe.brooks@alaska.gov; tom.maunder@alaska.gov; doa.aogcc.prudhoe.bay@alaska.gov STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test BP Exploration (Alaska), Inc. Prudhoe Bay /PBU / DS-09 06/12/10 Jerry Murphy John Crisp Packer Depth Pretest Initial 15 Min. 30 Min. Well 09-19 Type Inj. W TVD 8,689' Tubing 1,480 1,480 1,480 1,480 Interval 4 P.T.D_ 1770400 Type test P Test psi 2172.25 Casing 540 2,280 2,230 2,230 P/F P Notes: MIT-IA to 2300 for 4 year UIC OA 40 90 180 240 Pumped 7.2 bbls MEOH to achieve test psi Well 09-31C Type Inj. W TVD 8,487' Tubing 800 800 800 800 Interval 4 P.T.D. 1960640 Type test P Test psi 2121.75 Casing 440 2,320 2,300 2,300 P/F P Notes: MIT-IA to 2300 psi for 4 year UIC OA 30 30 30 30 Pumped 3.9 bbls of MEOH to achieve test psi Well 09-36C Type Inj. W TVD 8,588' Tubing 1,000 1,000 1,000 1,000 Interval 4 P.T.D. 1951140 Type test P Test psi 2147 Casing 610 2,300 2,260 2,250 P/F P Notes: MIT-IA to 2300 psi for 4 year UIC OA 130 300 300 310 Pumped 7 bbls of MEOH to achieve test psi Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA TYPE INJ Codes D =Drilling Waste G =Gas I =Industrial Wastewater N =Not Injecting W =Water TYPE TEST Codes M =Annulus Monitoring P =Standard Pressure Test R =Internal Radioactive Tracer Survey A =Temperature Anomaly Survey D =Differential Temperature Test ~2~7 INTERVAL Codes I =Initial Test 4 =Four Year Cycle V =Required by Variance T =Test during Workover O =Other (describe in notes) MIT Report Form BFL 11/27/07 MIT PBU 09-19 09-31 09-36 06-12-10.x1s MEMORANDUM • To: Jim Regg ~~cj ~(Z~'lu P.I. Supervisor _c~~ FROM: John Crisp Petroleum Inspector State of Alaska • Alaska Oil and Gas Conservation Commission DATE: Tuesday, June I5, 2010 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 09-31 C PRUDHOE BAY UNIT 09-31C Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~J~~'-- Comm Well Name: PRUDHOE BAY UNIT 09-31C API Well Number: 50-029-21396-03-00 Inspector Name: John Crisp Insp Num: mitJCr100614101622 Permit Number: 196-064-0 Inspection Date: 6/12/2010 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well ~o9-31C %pe Inj. j W TVD ~ 8487 ~ ~ IA -fi---- -+--- - SPT I 1960640'~ i 44 0 2320 ~ ~ ~---- 30 30 2300 i 2300 ~, ~----- 30 ~ 30 1 TypeTCSt Test psi p.T.D 2121 OA p~F _ Interval aYRTST P Tubin g soo s o soo I soo _ Notes: 3.5 bbls meth pumped for test. dt~r~ r f ~r °~fniJts., f"~;,;eyr~a LMriiM ~.~ ~;` iw ~ :_ ~J 14n Tuesday, June 15, 2010 Page 1 of 1 RECEIVED OfC 0 4 2006 a STATE OF ALASKA A ALAsWOIL AND GAS CONSERVATION COM~ON REPORT OF SUNDRY WELL OPERATION$¡/~8 1. Operations Abandon D Repair Well D Plug Perforations D Stimulate D Other ons. Ci'IRlI ! . Performed: Alter Casing D Pull Tubing D Perforate New Pool D Waiver D Time Extension t:horil1B FIf'~~IOIJ Change Approved Program D Operat. Shutdown D Perforate J Re-enter Suspended Well D 2. Operator BP Exploration (Alaska), Inc. 4. Current Well CI 5. Permit to Drill Number: Name: Developmen( 196-0640 3. Address: P.O. Box 196612 Stratigraphic P 6. API Number: Anchorage, AK 99519-6612 50-029-21396-03-00 7. KB Elevation (ft): 9. Well Name and Number: 8. Property Designation: 55 KB PBU 09-31C ADL-028327 11. Present Well Condition Summary: 10. Field/Pool(s): Prudhoe Bay Field/ Prudhoe Bay Oil Pool Total Depth Effective Depth Casing Conductor Surface Production Liner Liner measured 10943 feet true vertical 8824.25 feet measured 10900 feet true vertical 8825.06 feet Length Size MD 80 20" 91.5# H-40 31 - 111 2503 13-3/8" 72# K-55 30 - 2533 8371 9-5/8" 47# L-80 29 - 8400 826 7" 29# 13CR80 8234 - 9060 2129 2-7/8" 6.5# L-80 8816 - 10945 Plugs (measured) 9170,9390,9489,10000, 10531 Junk (measured) 10600 TVD 31 - 111 30 - 2532.84 29 - 8131.5 7972.8 - 8738.64 8525.11 - 8824.22 Burst 1490 3700 6870 8160 10570 Collapse 470 2230 4760 7020 11160 Perforation depth: Measured depth: 8972 - 8982 8987 - 8999 9094 - 9104 9206 - 10875 Closed 8826.96 - 8825.68 True Vertical depth: 8663.9 - 8672.58 8676.89 - 8687.2 8764.45 - 8771.28 Tubing: (size, grade, and measured depth) 5-1/2" 17# 4-1/2" 12.6# L-80 13CR80 29 - 37 37 - 8842 Packers and SSSV (type and measured depth) TRCF-4A TRSSSV 7" Liner Top Packer 4-1/2" Baker SABL-3 Packer 2096 8241 8774 12. Stimulation or cement squeeze summary: Intervals treated (measured): t) t:~j Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations 13. Oil-Bbl o o Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure o 10657 0 o 7009 0 15. Well Class after proposed work: Exploratory Development P 16. Well Status after proposed work: Oil Gas WAG WDSPL Tubing pressure 1217 748 Service x WINJ P 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Gary Preble Signature Title Data Mgmt Engr Phone 564-4944 Date 12/4/2006 Form 10-404 Revised 04/2004 0 RIG ! N Þ\ L RBDMS 8Ft DEC {) 6 2005 Submit Original Only . . 09-31 C DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11/19/2006 ***WELL INJECTING 4300-4700 BWPD AT ARRIVAL.*** T/I/O 770/450/0. WAITING FOR EQUIPMENT ON LOCATION. ***CONTINUED 20-NOV-2006*** 11/20/2006 **CONTINUED FROM 19-NOV-2006** INJECTING 4300-4900 BWPD AT ARRIVAL, RATE UNSTABLE. T/I/O INJECTION PROFILE RUN FROM 8840-9160 FT WITH LOGGING PASSES 40, 80, 120 FPM. STATION LOGS TAKEN ABOVE AND BELOW ALL PERFS. PLUG TAGGED 9166 FT. ALL INJECTION WATER OBSERVED FLOWING INTO BOTTOM PERFS AT 9094-9104 FT. ***JOB COMPLETE - WELL LEFT ON INJECTION*** SSV 500/300/400*** CONTACT PAD OPERATOR. SHUT IN INJECTION. BLOCK IN TRSSSV. PERFORATE WITH 2" POWERJET OMEGA FROM 9100-9114' AND 9132- 9142' CORRELATED TO MWD GR LOG DATED 16-APRIL-1996. AVERAGE PENETRATION=21.8". AVERAGE EXIT HOLE=0.22". ***WELL INJECTING ON DEPARTURE. SSV OPEN. SSSV UNBLOCKED FINAL T/I/O=0/300/40*** ***JOB COMPLETE*** FLUIDS PUMPED BBLS I 1 . DIESEL 1 . TOTAL Schlulllberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth 11/28/06 U'T-C- I q ~ -o0~1 NO. 4058 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job# Loa Description Date BL Color CD H-34 11477963 LDURST 11/07/06 1 y-01B 11485468 MPPROF W/DEFT & GHOST 11/07/06 1 2-08/K-16 11487771 LDL 11/12/06 1 X-03A 11485772 MPPROF W/DEFT & GHOST 11/09/06 1 DS 09-51 11477933 INJECTION PROFILE 11/06/06 1 15-45A 11485469 MPPROF & INJECTION PROF 11/09/06 1 N-o-7A 11296715 PROD PROFILE W/GHOST 09/10/06 1 DS 09-31C 11483591 INJECTION PROFILE 11/20/06 1 G-06A 11422979 SCMT 11/01/06 1 P2-59A 11414775 SCMT 11/05/06 1 NGI-06 11414773 USIT 11/01/06 1 A-43 11414774 USIT 11/03/06 1 01-26A 11001225 RST-SIGMA OS/24/05 1 1 I~ . . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services "" G,m'" SIm", 5,;" ~ A,""o"", AK ""~l A TTN Beth ê Received by: I / fI---- NO\! 9. 9 ?nOG a STATE OF ALASKA _ AlA~ Oil AND GAS CONSERVATION COM~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon 0 Repair Well 0 Plug Perforations 0 Stimulate 0 Other [] Convert to Inj Performed: Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension 0 5/30/2006 Change Approved Program 0 Operat. Shutdown 0 Perforate 0 Re-enter Suspended Well 0 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory 196-0640 3. Address: P.O. Box 196612 Stratigraphic Ci Service R1 6. API Number: Anchorage, AK 99519-6612 50-029-21396-03-00 7. KB Elevation (ft): 9. Well Name and Number: 55 KB 09-31C 8. Property Designation: 10. Field/Pool(s): ADL-028327 Prudhoe Bay Field/ Prudhoe Bay Oil Pool 11. Present Well Condition Summary: Total Depth measured 10943 feet Plugs (measured) 9170,9390,9489, 10000, 10531 true vertical 8824.25 feet Junk (measured) 10600 SCI't.¡\Î:\ÌbD \ è ~ ,i"') j Effective Depth measured 10900 feet ~¡UL l! ;', v true vertical 8825.06 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 31 - 111 31 - 111 1490 470 Surface 2503 13-3/8" 72# K-55 30 - 2533 30 - 2532.84 3700 2230 Production 8371 9-5/8" 47# L-80 29 - 8400 29-8131.5 6870 4760 Liner 826 7" 29# 13CR80 8234 - 9060 7972.8 - 8738.64 8160 7020 Liner 2129 2-7/8" 6.5# L-80 8816 - 10945 8525.11 - 8824.22 10570 11160 Perforation depth: Measured depth: 8972 - 8982 8987 - 8999 9094 - 9104 9206 - 10875 Closed True Vertical depth: 8663.9 - 8672.58 8676.89 - 8687.2 8764.45 - 8771.28 8826.96 - 8825.68 Tubing: (size, grade, and measured depth) 5-1/2" 17# L-80 29 - 37 4-1/2" 12.6# 13CR80 37 - 8842 Packers and SSSV (type and measured depth) TRCF-4A TRSSSV 2096 7" Liner Top Packer 8241 4-1/2" Baker SABL-3 Packer 8774 12. Stimulation or cement squeeze summary: Intervals treated (measured): RBDMSBFL JUL 272006 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 0 0 0 0 0 Subsequent to operation: 0 0 5118 50 1268 14. Attachments: 15. Well Class after Droposed work: Copies of Logs and Surveys Run Exploratory Development Service R1 Daily Report of Well Operations 16. Well Status after proposed work: Ci Oil Ci Gas Ci WAG Ci GINJ WINJ R1 WDSPL Ci 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I~Undry Number or N/A if C.O. Exempt: 305-360 Contact Sharmaine Vestal P'¡ote' N,me Sh'~';"e V"tal _~ Title Data Mgmt Engr Signatu~ Phone 564-4424 Date 7/27/2006 Form 10-404 Revised 04/2004 Submit Original Only ~.(fù.'. Tilià..~~.· r6 ..' IU' .'n~ Ii , U L:::I e rñì rP¡~ n ! IIU' iF Iu\ II".. 1b!J U LilJ lb e AIfASIiA. OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR Victoria Imeh Production Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 333 W. 7"H AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276·7542 Re: PBU 09-31 C Sundry Number: 305-360 ~","~ ~' ~~ANNE[j r· <i" f:~ ?QiÍ ¡< {j ...1 U c..':uJ! Dear Ms. Imeh: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of appfõvãl set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. n . Norman ChaIrman ~.!! DATED thisL day of December, 2005 Encl. ~~h"',g~ WG~\,!;tfU1t;#i ~J a STATE OF ALASKA . b"'.J'·· /JJEC 0 . 0 - AL~ OIL AND GAS CONSERVATION COMMISSION ,/. 1</ '/ k 6 I ,. OJ APPLICATION FOR SUNDRY APPROVALS A(,Ska Oil & Gas Co¡¡~ ..~mmìssion 20 MC 25 280 . . 1. Type of Request: Abandon U Suspend U Operational shutdown U Perforate U Waiver U ~l"er L::J Alter casing D Repair well D Plug Perforations D Stimulate D Time Extension D Revised document Change approved program D Pull Tubing D Perforate New Pool D Re-enter Suspended Well D Convert to Injector 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: 0 D .it.:;J:,. BP Exploration (Alaska), Inc. Development Exploratory 1.....0 3. Address: Stratigraphic D Service D 6. API Number: P.O. Box 196612 Anchorage, Alaska 99519-6612 50-029-21396-03-00 7. KB Elevation (ft): 9. Well Name and Number: 55 KB 09-31C 8. Property Designation: 10. Field/Pools(s): ADL-028327 Prudhoe Bay Field/Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10943 8824.25 10900 8825.06 9170,9390,9489,10000, 10600 110531 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 91.5# H-40 111 111 1490 470 Surface 2503 13-3/8" 72# K-55 2533 2533 3700 2230 Production 8371 9-5/8" 47# L-80 8400 8132 6870 4760 Liner 826 7" 29# 13CR80 9060 8739 8160 7020 Liner 2129 2-7/8" 6.5# L-80 10945 8824 10570 11160 Perforation Depth MD (ft): l~erfOration Depth TVD (ft): rUbing Size: I~Ubing Grade: Tubing MD (ft): 8972-9104 8663.9-8771.28 5-1/2" 17#; 4-1/2" 12.6# L-80 37;8843 Packers and SSSV Type: 7" Liner Top Packer; 4-1/2" Baker Sabl 3 Packers and SSSV MD (ft): 8241;8774 Packer 12. Attachments: Description Summary of Proposal L::J 13. Well Class after proposed work: Detailed Operations Program D BOP Sketch D Exploratory D Development D Service 0 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 12/20/2005 Oil D Gas D Plugged D Abandoned D 16. Verbal Approval: Date: WAG D GINJ D WINJ 0 WDSPL D Commission Representative: Prepared by Sharmaine Vestal 564-4424 17. I hereby certif) hat the foregoing is true and correct to the best of my knowledge. Contact Victoria Imeh Printed Name f)(' vicfria Imeh Title Production Engineer Signature I ~.ll Phone Date 12/5/2005 COMMISSION USE ONLY Sundry Number: :J:J0 'Z '-[.-1._ Conditions of approval: Notify Commission so that a representative may witness ..... .:::7 ( I ~ "S Go 0 Plug Integrity D BOP Test D Mechanical Integrity Test Location Clearance D VJ4~ Other: RBDMS BFL DEC 0 7 2005 404-. ApP,~,.JJ. APPROVED BY Iv" ¡'/D( .---- COMMISSIONER THE COMMISSION Date: ~ V "--"""" Form 10-403 Revised 07/2005 ORIGINAL Submit in Duplicate e e bp o BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 November 17, 2005 Winton Aubert Alaska Oil and Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, AK 99501 RE(~ NOV 2 2 2005 A\aska Oil & Gas Cons. RE: Application for conversion to injection service: DS 9-31 C Anchorage Dear Mr Aubert: Enclosed is an Application for Sundry Approval to convert DS producer 9-31 C to injection service. The following supporting documentation is included for your review: · Application for Sundry Approval · Map showing wells within ~ mile radius · Cement bond log (SCMT) · Wellbore schematic · Conversion procedure Please do not hesitate to call if you require additional information. Si1 Victoria Imeh East Waterflood Production Engineer 564-5233 9-31 II V r I n e ._ e</._"/.._'"......~/.·c;~/..,,..:.:.........; ......~,><.,...."...:/...,.~"C . ·c. '- ....., ...:........:.·...hO..A·.·,.·~" .~.~...,;..~...~.v....~,"C - 1< Schlumberger Company: BP EXPLORATION (ALASKA) INC. Well: Field: Borough: ~ ~ ~ -oJ $ w u.. Z W >- ã> 0 Il. i1i æ ~ 9wcðÜoz en 0 -.J z;; ..J 0 J:J:fed>Il.¡:: ligr-.°~ð ~Œ~~~9 .i:: c: ~ 0> 0 a:I ð -ë:¡¡j a. Š æ -9 ~ ~ Lo in Date Run Number De th Driller Schlumberger Depth Bottom Lo Interval Top Log Interval Casing Fluid Type Salinit Densit Fluid Level BIT/CASING/TUBING STRING Bit Size From To Casin /Tubin Size Wei ht Grade From To Maximum Recorded Temperatures Logger On Bottom Time Unit Number Location Recorded B Witnessed D.S. 09-31 C PRUDHOE BAY NORTH SLOPE State: SLIM CEMENT MAPPING TOOL W/GRADIO MEASUREMENT 05-NOV-2005 ALASKA 1567' FSL & 998' FEL Elev.: K.B. 55 ft G.L. 22 ft D.F. 54 ft Elev. : 0 ft 55.0 ft above Perm. Datum Permanent Datum: Log Measured From: Drilling Measured From: MSL RKB RKB API Serial No. 5Q-029-213~-03 5-Nov-2005 ONE 9170 ft 9162 ft 9162 ft 8760 ft 1 % KCL Section 2 Township Range 10N 15E 8.7 Ibm/ al .5Q0 in r' Oft 10945 ft 2.875 in r' 6.5 Ibm/ft LBO 8816 ft 10945 ft 149 degF 5-Nov-2005 2145 PRUDHOE BAY J. WIBLE J. BOYLES 20:25 · , , , ."11 :' , , ....... : I- : r-I- : · · · , , I · , , 8f!Q,O · ~- · · Î I .... .... ..... .... ~ , <. I' ~ ... ..... ~ ~ .... "2 ~ '~ ill. - ". J. , II. 1-. ''-1 __ w" 11 . ""!- : , I -- ' -......; I , · , , ... .. ... ... .., ~,....... =9tS.. Jo.;;; 'L.., ..... f!:::' ,.:. - <!IÎ: ,:'1 C"''>-.~~.':. ,~~ ~{.....( J': ·r~lf, ~.. ~tJt N THEORmCAL TRANSIT TIME ...... .... -} .. - .... ~ -- - - ~ ...,. -- < .. ~ .. '. ....... ""- - ... ..... .... . ".. ....... - ~ - ~- ... - ... - ... ...,. -:;;.... ..-- - - .- 'u J ""'+:·:·1 <. i~ ·;"..t·....·!, j ~Ij :, II S ~ éJ CYCLE SKIPPING IN Hi.v ATTENUATIVE CEMENT 'T·:·] .. ~ t- 'L r:? :Cr ... ¡....., ! - - ..... I' < - ..J. ... - - '\ - ... ~ ~ · - 8900 - - · · - '" · I-p.- I .... · · ~ , ~ · · · .... " · , - \ . ... .'" ..... .. ~F. r-.. ...... Pt~f .- r .... - < I -' .> ... . - 1::- " - -~ ,4IiI ....... ... '\ ;.. .?' ~,.':.:. ........ .~::: " ~,' .)!.,:~ t::r:::J ~ - ì:~ ~~tl~ .. ':'''" iIír:' '0411V "';1& APE (1HEOR~itr "" I 1( t t t ,> ,t,-.'j ~r ~,~- :;$ :4i~ ~ ... 'Ø I ( " ,:. R Iv.: I:::, f:i I>. )i,:: ,/ ..... -- -. .- -. -- .- -- ;- JlI \<~ " ,: i \ ~l \ ~\ .. :"- \ .1t;':..", / - ... ..... I ~ i '"'t.' ... rt/: - - ....... ... ¡.;, ... - "" ..... 1< .' ... .r , ...:. ;...... ..,. , " '.-. --- "" I.... c" ",. ;" 11 L """'" '!!!-. I'lf. :::-- :.-. ~ .,. I ..... r - - - -.. .. . , , t . . , . , ;, ' . , ,: . , EM. ... tlL bp .,. .",.,,,. ..~~ ~~. ~...- -a ~4p'& ~ ·,i''''\, ". e e To: J. Bixby/D. Cismoski Date: October 10, 2005 GPB Well Ops Team leaders PECT: PBD09WL31-M From: Vickie Imeh Production Engineer lOR: 300 Subject: 9-31 C - Conversion to Injection Est. Cost: $1.75M 1 S Dummy GL Vs 2 F AOGCC to witness MIT -IA to 2500 psi Current Status: Max Deviation: Min.ID: Last TD Tag: Last Downhole OP: Latest H2S Value: L TSI, Converting to injection 96 degrees @ 9694' md 2.387" LNR XO @ 8822' md 04/29/1996 11/24/2001 - Additional perfs 189 ppm - 7/18/2003 Well 9-31 was initially drilled in May 1986, and sidetracked both in April 1993 and April 1996. It had been completed with 2-7/8" cemented liner for use as a horizontal MIST injector. Water was injected between bulbs of MI at rates of 10 MBWD. It was then converted to a producer in October 2001. Well 9-31 did not flow oil until additional perforations were shot in Zone 4. Unfortunately, production quickly fell below 100 BOPD. It was finally shut-in for high water cut and low oil production in August 2003. 9-31 C is currently being converted to a water injector pending completion of surface conversion. It is hoped that the actual surface conversion will be completed by 4Q of this year. This program requests well preparation and MITIA to confirm integrity in inner annulus. 9-31 is ready for injection as soon as the IA test is completed, and appropriate state approval has been obtained. Contacts Victoria I meh Office 564-5233 Home 748-4961 Cell 748-4961 cc: w/a: Well File Victoria Imeh TREE = 5-1/8" McEVOY W8.LHEAD = McEVOY A CTUA TOR = AX8.S0N KB. ELEV = 55.0' BF. ELEV = 23.0' KOP = 4400' Max Angle = 96 @ 9694' DatumMD= 9521' Datum TVD = 8800' SS 113-318" CSG, 72#, L-80/K-55, ID = 12.347" Minimum ID = 2.387" @ 8822' 3-1/2" X 2-7(8" LN R XO ITOPOFBKRC-21lESACKSLv,ID =7.50" 9-518" X T' BKR LNR PKR, ID = 6.190" 19-518" X T' BKR LNRHGR, ID=6.100" 1 e 8234' 8241' 8246' 19-518" CSG, 47#, L-80, ID = 8.681" H 8400' 9-5/8" CSG MILLOur WI~OW 8400' - 8450' (SECTION MLL) 14-1/2" BKRDEA.OYMENTSLEEVE, ID=3.00" 3-1/2" X 2-7/8" LI'R XO, ID = 2.387" 4-1/2"TlP,12.6#,13-ffi, .0152 bpf, D =3.958" I 8842' ÆRFORA TON SUIvfv1ARY REF LOG: SPERRY-SLI'I MNDLOG ON 04/27/96 ANGLE AT TOP PERF: 30 @ 8972' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA "IE 2" 6 r'8972 - 8982 0 11/24/01 2" 6 8987 - 8999 0 11/24/01 2" 6 9094 - 9104 ' 0 10/16/01 2-1/8" 4 9206 - 9226 C 10/16/01 2-1/8" 4 9236-9254 C 10/16/01 2" 4 9267 - 9287 C 10/16/01 2-1/8" 4 9710- 9785 C 05128/98 2-1/8" 4 1 0250 - 1 0325 C 02/04/97 2-1/8" 4 10775 - 10875 C 10/12/96 7" LI'R, 29#, 13-CR-80, ID = 6.184" 9398' DATE REV BY COIvfv1ENTS OS/28/86 ORIGINAL COfvPLErION 04/21/93 RIG SIŒTRAO< (09-31A) 04/28/96 CTDSIŒTRAO< 09-31C 12/22/00 SIS-SLT CONVERTs) TO CANV AS 01/22/01 SIS-LG REVISION 11/24/01 CI-VTP CORRECTIONS [)II. "IE RE:V BY 11/24/0 1 CWS/KA 09/02/02 BHC/W 09/09/02 BHCAlh e 09-31C SAFETY NOTES: 4-1/2" TBG & 7" LNR ARE 13 CI-ROM E WELL ANGLE> 700@ 9210· & > 90° @ 9600'. . -15-1 f2." lBG, 17#, L-80, .0232 bpf, ID = 4.892" I -15-1 f2." X 4-1/2" XO, ID = 3.958" I 4-1f2." CAM::OTRCF-4A 1RSSSV, ID=3.812" ST MD TVD 1 3193 3193 2 4802 4786 3 5605 5535 4 6178 6063 5 6704 6548 6 7236 7038 7 7765 7530 8 8059 7807 9 8202 7942 GAS LIFT flNl.NCR8.S ŒV lYPE VLV LATCH PORT [)II."IE o TGPD OOrJE RK 16 10/24/01 18 TGPD S/O RK 20 10/24/01 23 TGPD DV RK 0 03131196 23 TGPD DV RK 0 05123195 23 TGPD DV RK 0 03131196 22 TGPD DV RK 0 04/22193 21 TGPD DV RK 0 04/22193 19 TGPD DV RK 0 04/22193 18 TGPD DV RK 0 05123195 8757' -i4-1f2." SoNS NIP, ID= 3.813" 1 8774' -iT' X 4-1/2" BKRSABL-3 PKR, ID = 3.875" 8832' -14-1f2." SoNS NIP, ID= 3.813" (BEHIND LI'R) 8843' 8850' -14-1f2." WLEG (BEHlNDLI'R) 1 H8.rvD TT LOGGED 07/08194 I ~MILLOUT WI~OW (9-31C) ~. - 9066' (OFF CIv1T RAMP) ~2-7/8" CIBP(SET05l28/98) I ASH -2-1/8" CIBP (LOST9-25-96) 2-7/8" BKRLC (PBTD) 12-7/8" LNR, 6.5#, L80,.0058 bpf,lD = 2.387" 1 COMMENTS A !PERFS RBv10VE aBP@ 9431' CTM PERF CORRECTIONS ffiLOHOE SA Y UNT WELL: 09-31C PERIv1IT No: 1960640 AA No: 50-029-21396-03 SEC 2, T1 ON, R15E1587' FSL & 988' FWL BP Exploration (Alaska) e e MECHANICAL INTEGRITY REPORT' ......., 5?UD D.!..::':: tll ~I iqq& . :.~G RELE;_S=:: 4/1 7 ( Lqc¡~ OPER & FIELD B P P (JU ~"ELL NUMBER oq" ~ I C. 19ro - Ob4 ~-¡LL DATA TD: I oq.{S JID.. ff24 TIn j :?BTD: 10900 MD ;;2(' TVD W¡ IAJow Casi~g: 7" .sho-e: 9ù(po HD TVD¡ DV: MD ·TV"D _:..:¡e~: 2" 7/~" Shoe: /OQ4(' HI) :'Joi:;g: 4- 12." Packer &-&4 ~. till ::'ole Size ¡.I/1 1/ anå ~. '1-11 ., f12.4 TVD¡ :OP: f f / ú t-ID fc; 2- ç- ;:VD TV'D¡ Set at: f774 P er£s ~q72 to 9/04 :-SC7..Þ~'ÌIC;'.L INTEGRITY - PART /l Annulus Press Test: ~P 15 m~n 30 min COü:ïI:lents: }~IT rtbfAA~~./ d , ".- MECHÞJi!ICÞ.~ INTEGRTTY - PART /2 Cement: Volumes :'. ..Amt. Liner 17.S bbls ; Csg j DV C¡¡¡t -"01 to cover perfs Il,çbh/s Ç~'CA/'IAA..t--.Þ; U1Ú..·ý 4ru''Y~ + soo' tV/~(}~;) ~;r:;., Theoretical TOC gc;SC:; · Cement Bond Log (Yes or No) .~ CBL Evaluation, zone above perfs 1.o.,J f~70' , Proåuc..tion Log: Type ; In AOGCC File . v ~wJ:t ~ib'¡'7 ,,, JJc;:þJ Evaluati.on ...., CONc;LUSIONS: to to at I PRUDHOE 8A.Y, PRUDHOE QL PBU_DS9 8A.Y Oil Rat. (CDJ( bhlld ) _ Wat.r Rat. (CD) ( bblld ) Gas Rat. (CD) ( Mcfld ) PPT.PRESS CumO¡¡ ~ W:aterCut{%) ~ Gas j Oil Ratio 2001 03 02 Date 04 09-31C (PTD# 1960640) Classified as a Problem Well e e Suh.icct: 0<)-3 I C (PTDff 1960(40) CIassi lied us a Problem Wcll From: "NSU, ADW Well Integrity Engincer" <NSLJADWWclllntcgrilyEnginccr@BP.com> Date: Tuc, 25 Oct 2005 20:59:51 -0800 To: "AOGCC Winton AubcI1 (E-mail)..<winton__aubert@admin.statc.ak.us>. j imJcgg@admin.statc.aleus CC: "NSU, ADW Well Operations Supervisor" <:'\SUAD\VWcI10pcrationsSupervisor@BP.col11>, "Engel, Harry R" <EngcIHR@~.BP.com>, "Rossbcrg, R Steven" <RossbeRS@BP.col11>, "Kurz, John" <:john.kurz@13P.com>. "GPB, FS2/COTU Area Mgr" <GPBFS2TL@BP.com>, "GPB, FS2 DS Ops Lead" <GPBFS2DSOpsLcad@BP.col11>, "NSU, ADW Well Integrity Engincer" <J'\SUADWWclllntegrityEnginecr(à}BP.com>, "GPB, Wclls Opt Eng" <GPBWcllsOptEng@HP.com>, "Winslow, Jack L." <Lyonsw@BP.com>, "Hughes, Andrea (VECO)" <hugha4(ë.~:ßP.col11>·, "Imeh, Victoria" <imchvI@dBP.com> All, Well 09-31C (PTD# 1960640) has been found to have sustained casing pressure on the IA. The TIOs on 10/24/05 were 2160/2120/30 psi and the well failed a TIFL on 10/24/05. The plan forward for this well is as follows: 1. DHD: TIFL - FAILED 2. SL: Run DGLVs in sta# 1 & 2 3. DHD: Re-TIFL «09-31C.pdf» A well bore schematic has been included for reference. Please call if you have any questions. Thanks, Donald Reeves - Filling in for Anna Dube Well Integrity Engineer 907-659-5102 907-659-5100 #1923 pgr Content-Description: 09-31Cpdf Content-Type: application/octet-stream Content-Encoding: base64 :::¡::;t\-- ~ Cps'·) 21?-û M:Pt,P (ps:) 6ê610 ~ ~(f' ~----.. XJ. '1 ~ ¿¡~- pe>- eû4 (:ì Z C'.;.. 4~-éèD ~ f ~1 '~f7J1/as- 1 of 1 12/22/20054:09 PM - - TREE = 5-1/8" McEVOY SAFETY NOTES: 4-1/2" TBG & 7" LNR W8..LHEAD = McE',¡¡W 09-31C ARE 13 C !-ROM E WELL ANGLE> 70° @ ACTUATOR = AX8..~,: ;\ 9210' & > 90° @ 9600'. KB. ELEV = BF. ELEV - \ I I 34' 5-112" lEG, 17#, L-80, .0232 bpI, ID= 4.892" KOP- "". Max Angle = 96 @¡,: '- -- 1-15-112"X4-1/2"XO,ID=3.958" I ---t 37 Datum MD = f ,/. DatumTVD = 880(, :;', . I 2096' 4-112" Cð,IIIk:;OTRCF-4A 1RSSSV, ID=3.812" GAS LIFT rvlA.NDR8..S 113-318" CSG, 72#, L-80/K-55, ID = 12.347" I 2533' ~ . ST MD ND DEV 1YPE VLV LATCH POR ()I.\.1E 1 3193 3193 0 TGPD DOrvE RK 16 10/24101 I Min ¡mum ID = 2.387" @ 8822' I U 2 4802 4786 18 TGPD S/O RK 20 10/24101 3-1/2" X 2-7/8" LNR XO 3 5605 5535 23 TGPD DV RK 0 03131/96 4 6178 6063 23 TGPD DV RK 0 05123/95 IToPoFBKRC-2TIEBACKSLv,ID=7.50" 1 8234' I 5 6704 6548 23 TGPD DV RK 0 03131/96 19-5/8" X 7" BKR LNR PKR, ID = 6.190" I 6 7236 7038 22 TGPD DV RK 0 04122/93 8241' I ~ ~ 7 7765 7530 21 TGPD DV RK 0 04122/93 19-5/8" X 7" BKR LNR HGR, ID = 6.190" 8246' 1--- 8 8059 7807 19 TGPD DV RK 0 04122/93 9 8202 7942 18 TGPD DV RK 0 OS/23/95 19-5/8" CSG, 47#, L-80, ID = 8.681" H 8400' LJ 9-5/8" CSG MILLOUT WINDOW I I 8757' 1--i4-112" SWS NIP, ID= 3.813" 1 8400' - 8450' (SECTION MLL) Ix 8774' 1-i7" X 4-1/2" BKRSABL-3 PKR,ID= 3.875" I 14-1/2" BKRDEA...OYM8'.ITSLEEVE,ID=3.00" 8816' 13-1/2" x 2-7/8" LNR XO, ID = 2.387" I 8822' I 8832' 4-112" SWS NIP, ID = 3.813" (BEHIND LNR) 1 4-1/2" TIP, 12.6#, 13-CR, .0152 bpI, D = 3.958" 8842' 8843' 1-14-112" \NLffi (BEHIND LNR) 1 I 8850' H 8..M:> IT LOGGED 07108/94 1 ÆRFORA TON SUWMARY REF LOG: SPERRY-SUN I'vtND LOG ON 04/27/96 7" LNR MILL OUT WINDOW (9-31C) ANGLE AT TOP PERF: 30 @ 8972' S 9060' - 9066' (OFF CMT RAM~ \ No1e: Refer to Production DB lor historical perf data ~ SIZE SPF INTIRV AL Opn/Sqz DA1E ~ j 9170' 1-J2-7/8" CBP(SEr 10/16/01) I 2" 6 8972 - 8982 0 11/24/01 2" 6 8987 - 8999 0 11/24/01 /9390'elm lJ2-7/8" OBP(SET07/25/00) 1 2" 6 9094 - 9104 0 10/16/01 2-1/8" 4 9206 - 9226 C 10/16/01 9489' I J2-7/8" CIBP(SET05/28198)1 2-1/8" 4 9236 - 9254 C 10/16/01 2" 4 9267 - 9287 C 10/16/01 10000'ctm 1-12-7/8" CTM OBP(SET 02/04/97) I 2-1/8" 4 9710- 9785 C OS/28/98 2-1/8" 4 10250 - 10325 C 02/04/97 110531'elml-i2-7/8" CIBP (SET 1 0/12/96) 2-1/8" 4 10775 - 10875 C 10/12/96 10600' FISH -2-1/8" CIBP I (LOST 9-25-96) .I 10882' 2-7/8" BKRLC (PBTD) 17" LNR, 29#, 13-CR-80, ID = 6.184" 1 9398' 12-7/8" LNR, 6.5#, L80..0058 bpf,lD =2.387"1 10945' DATE REV BY COrvllllENTS ()I.\.1E RE:V BY COMMEN1S FRUDHOE BA Y UNIT OS/28/86 ORIGINAL COMPLETION 11/24/01 CWS/'t<A ~ A DPERFS WELL: 09-31C 04/21/93 RIG SIŒTRACK (09-31A) 09/02102 BHCITP RI3II10VE CIBP@ 9431' CTM PERIIIIIT No: 1960640 04/28/96 CTD SIŒTRA CK (09-31 C) 09/09102 BHCltlh PERF CORRECTIONS A A No: 50-029-21396-03 1 2/22/00 SIS-SLT CONIIIRTID TO Cð, NIl AS SEC 2, T1 ON, R15E1587' FSL & 988' F\NL 01/22/01 SIS-LG REVISION 11/24/01 CHlTP CORRECTIONS BP Exploration (Alaska) 11/28/05 Schlumberger ç:.' i \! ~ r""~ :'\---,>*_4 "3 ~~ ~J NO. 3613 i~ &~ :_~"-:"'~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth r? C 2U05 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field, p",dhoe Bay, Mlln. Pl t~""~ }", ~ '. Cúmm¡~t\(¡f\ :f}JJfj¡QfSge Well Job# Loa DescriDtion Date BL Color CD PSI-07 40009685 OH LDWG EDIT OF MWD/LWD 10/12/03 1 PSI-07 40009685 MD VISION DENSITY 10/12/03 1 PSI-07 40009685 TVD VISION DENSITY 10/12/03 1 PSI-07 40009685 MD VISION DEN/NEUTRON 10/12/03 1 PSI-07 40009685 TVD VISION DEN/NEUTRON 10/12/03 1 PSI-07 40009685 MD VISION SERVICE 10/12/03 1 PSI-07 40009685 TVD VISION SERVICE 10/12/03 1 Z-02A 11132059 USIT 10/06/05 1 S-14A 10987547 US IT 09/13/05 1 Y-1OA 10889216 SCMT 02/21/05 1 D.S. 03-33A 10893093 SCMT 03/05/05 1 C-19B 10928633 SCMT 05/15/05 1 09-20. ....=:, 10889215 SCMT 02/18/05 1 O:S.09-31Q.2-) N/A SCMT IGf (,,- eM-' 11/05/05 1 P-=U6~ 11076455 SCMT 07/29/05 1 2-22A 11084275 SCMT 07/10/05 1 K-20B 11075899 SCMT 07/04/05 1 D.S. 06-20 11062630 US IT 06/14/05 1 C-18A 10621788 SCMT 06/06/04 1 P1-07A 10621778 SCMT 04/21/04 1 BP Exploration (Alaska) Inc, Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: \ I I if:, \ [)'5 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ::,:::t~Õ?Ð(j ~ ~ÇANNED DEC 1 (j 2005 " . . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RI=PORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate _X Gl BP/Add Pelfs Pull tubing _ Alter casing _ Repair well _ Other_X ClBP/AddPerfs 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 1587' FSL, 998' FEL, Sec. 02, T10N, R15E, UM At top of productive interval 2526' FSL, 2187' FEL, Sec. 02, T10N, R15E, UM At effective depth 2632' FNL, 2128' FEL, Sec. 02, T10N, R15E, UM At total depth 983' FNL, 2605' FEL, Sec. 02, T10N, R15E, UM 5. Type of Well: Development __X Exploratow__ Stratigraphic__ Service__ (asp's717377, 5943027) (asp's n/a) (asp's 716215, 5944054) (asp's 715689, 5945688) 6. Datum elevation (DF or KB feet) RKB 55 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 09-31C 9. Permit number / approval number 196-064 10. APl number 50-029-21396-03 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10946 feet Plugs (measured) 8825 feet Effective depth: measured 9170 feet Junk (measured) true vertical 8812 feet CIBP #4 Set @ 9170' (10/16/2001) CIBP #3 Set @ 9489' (05/28/1998) ClBP #2 Set @ 10000' (02/04/1997) ClBP #1 Set @ 10531' (10/12/1996) Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 111' 20" 1800# Polyurethane 111' 111' Surface 2483' 13-3/8" 2500 sx CS III & 400 sx 2533' 2533' CS II Production 8355' 9-5/8" 500 sx Class 'G' & 300sx 8405' 8136' CS I Liner 820' 7" 264 c.f. Class 'G' 8234' - 9054' 7973' - 8734' SideTrack Liner 2129' 2-7/8" 98 c.f. Class 'G' 8816' - 10945' 8526' - 8824' Perforation depth: measured Open Perfs 9094' - 9104', Isolated below CIBP's 9206' - 9226', 9236' - 9254', 9710' - 9765', Isolated below CIBP's continued 10250' - 10270', 10273' - 10298', 10300' - 10325' true vertical Open Perfs 8765' - 8771', Isolated below CIBP's 8827' - 8833', 8835' - 8838', 8850' - 8846', Isolated below CIBP's continued 8841' - 8841', 8841'- 8841 ', 8841' - 8841' Tubing (size, grade, and measured depth) 5-1/2", 17#, TBG @ 37'. 5-1/2" x 4-1/2" @ 37'. 4-1/2" 12.6#, 13CR TBG @ 8843'. ,~ . Packers & SSSV (type & measured depth) 7" x 4-1/2" Baker SABL-3 Packer @ 8774'. 4-1/2" Camco TRCF-4A SSSV @ 2096'. '.,!."-,~: ?, ~,, --~, .~ .~ 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 10/28/2001 Subsequent to operation 11/05/2001 Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Well conversion from MI injection to Production --- BOL. 100% Water 659 1306 Casing Pressure Tubing Pressure GL - 941 psi 236 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,C. f,.~j~ Title: Petroleum Engineer for DS 09. Jennifer Watson ~ Form 10-404 Rev 06/15/88 · ORIGINAL Date November 07, 2001 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICAT~ 09-31C DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 10/12//2001 INFLATABLE BRIDGE PLUGS: DRIFT AND TAG (PRE CIBP- ADD PERF ) 10/16/2001 INFLATABLE BRIDGE PLUGS: SET ClBP @ 9170'/PERF FROM 9094'-9104' 10/23/2001 INFLATABLE BRIDGE PLUGS: BRUSH AND FLUSH / SET GLV'S (POST ClBP) IN PROGRESS 10/24/2001 INJECTION CONVERSION: GL C/O EVENT SUMMARY 10/12/01 DRIFT AND TAG W/10' X 2.25" DRIVE DOWN BAILER TO 9186' SLM. STOPPED DUE TO DEV. WELL LEFT SHUT IN. 10/16/01 SET BAKER 2 7/8" ClBP AT 9170' (MID ELE), PERF 9094'-9104' WITH 2" HSD, PJ, 6 SPF, TIED INTO GR/CCL DATED 07/24/01. ALL SHOTS FIRED, (NO TAG). LEAVE WELL SHUT IN FOR UPCOMING GAS LIFT WORK. ***SHUT IN*** I O/23/O 1 ATTEMPT TO SET SS C-SUB. SCHMOO IN TBG PREVENTING SLIPSTOP FROM SETTING. PUMPED HOT DIESEL AND DEAD CRUDE @ 2 BPM WHILE BRUSHING TUBING FROM SURFACE TO 4900' WLM W/4 1/2 BRUSH AND 3.80 GAUGE RING -- SET 4 1/2 SLIPSTOP @ 4896' -- PULL 1-1/2" DGLV W/RK LATCHES FROM STA.# 2 - 4788' AND # 1 - 3178' SLM 1 O/24/O 1 SET NEW GASLIFT DESIGN {STA.# 1 @ 3178' WLM 16/64" PORT W/1500 PRESS} {STA.# 2 @ 4788' WLM 20/64" ORIFICE} -- PULL 4 1/2 SLIPSTOP FROM 4896' WLM *** WELL IS READY TO POP *** FLUIDS PUMPED BBLS 3 PRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (3 TESTS) 30 DIESEL USED FOR BRUSH & FLUSH 55 DEAD CRUDE USED FOR BRUSH & FLUSH 88 TOTAL 10/16/2001 ADD PERFS THE FOLLOWING INTERVAL WERE PERFORATED USING THE 2" HSD POWER JET AT 6 SPF, 60 DEGREES PHASING, AND RANDOM ORIENTATION. 9094' - 9104' Page 1 sTATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon_ Suspend_ Operational shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance _ Perforate _ (MIST INJ -> Prod Convert) Other_X 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 3691' FNL, 997' FEL, Sec. 2, T10N, R15E, UM At top of productive interval 2753' FNL, 2187' FEL, Sec. 2, T10N, R15E, UM At effective depth At total depth 981' FNL, 2601' FEL, Sec. 2, T10N, R15E, UM 5. Type of Well: Development __ Exploratory __ Stratigraphic __ Service__X (asp's 717376, 5943027) (asp's 716160, 594391) (asp's 715693, 5945690) 6. Datum elevation (DF or KB feet) RKB 55 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 09-31Ci 9. Permit number / approval number 196-064 10. APl number 50-029-21396-03 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 1 0946 feet Plugs (measured) true vertical 8824 feet Effective depth: measured 9390 feet Junk (measured) true vertical 8848 feet Casing Length Size Cemented Conductor 111' 20" 1800# Polyurethane Surface 2478' 13-3/8" 25oo Sx CS m & 4o0 Sx CS H Production 8345' 9-5/8" 500 Sx Class G & 300 Sx CS I Liner 837' 7" 264 cuft Class G Liner 2129' 2-7/8" 17.5 bbls Class G New CIBP#3 set on (7/25/2000) @ 9390' MD. Orig CIBP#3 pushed to 9431' MD on 7/24/2000. ClBP#2 set @ 10000' MD (2/04/1997). CIBP#1 set @ 10531' MD (10/12/1996). Measured Depth True vertical Depth 111' 111' 2533' 2533' 8400' 81 32' 9060' 8739' 10945' 8824' Perforation depth: Tubing (size, grade, and measured depth measured 9206' - 9226'; 9236' - 9254'; 9265' - 9285'; (Isolated below ClBPs are 9710' - 9765'; 10250'- 10270'; 10273' - 10298'; 10300' - 10325'). 5-1/2", 0#, Tbg @ 37' MD; 4-1/2", 12.6#, 13CR -I-bg @ 8843' MD. true vertical 8827' - 8833'; 8835' - 8838'; 8840' - 8843'; (Isolated below ClBP's are 8850' - 8846'; 8841'- 8841'- 8841' - 8841" 8841' - 8842'). U~ 7" x 4-1/2" BAKER SABL-3 PACKER @ 8774' MD. Packers & SSSV (type & measured depth) 4-1/2" CAMCO TRCF-4A SSSV @ 2096' MD. 13. Attachments Description summary of proposal __X Detailed operations program __ 15. Status of well classification as: BOP sketch, ,"~"', O Suspended __ 14. Estimated date for commencing operation May 5, 2001 16. If proposal was verbally approved Name of approver Date approved Oil __ Gas __ Service __.(WAG)__ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SignedJennife~~"~ ~ ~ ~ Title: DS 9 Surveillance Engineer FOR COMMISSION USE ONLY Questions? Call Jennifer Watson @ 564-5764. Date Prepared by Paul Rauf 564-5799 Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance __ Mechanical Integrity Test__ Subsequent form required 10-~_~.~, ORIGINAL SIGNED BY Approved by order of the Commission ~ Taylor Seamount Commissioner Appr°val n°' ,.~,~.~ (_ l [ C1 Date ~'//7// Form 10-403 Rev 06/15/88 · SUBMIT IN TRIPLICATE bp BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 26, 2001 Tom Maunder Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Fax 276-7542 Dear Tom: Re: Sundry_ Notice for 09-3 lC Conversion from MIST Injector to Production Discussion BP Exploration Alaska, Inc. proposes to convert well 09-3 lC from an MI injector back to an active producer. Well 09-31C was drilled and converted to an injector as a lateral MIST project in April 1996 (Permit to Drill 96-64 signed 4/1/96). This conversion back to producer status is part of the original scope of the project. The well currently exhibits mechanical integrity as an injector. No facility modifications are required for this conversion. Current plans are to isolate the Zone 2C perforations that took MI injection and complete the well in Zone 3 and Zone 4. If you have any questions concerning this Sundry Application, please don't hesitate to call me at 564-5764 or E-mail me at watsonJD@bp.com. Sincerely, aon BPXA DS 9 Surveillance Engineer TREE = ? [WELLHEAD= MCEVOY ACTUATOR= AXELSON 'kBi ~-"~ ................................. 55 'BF'i' ~-= ................................ ? KOP = ? ~'~'"~'n'gi~ ~ ~'"~ 969~ Datum MD = 9529 Datum TV D-- 8800'SS I 5-1/2" TBG, 17#, ~?, .0232 bpf, lD=4.892 Id 37' 13-3/8" CSG,72#, LG0/K55, .1481 bpf, ID:12.3471d 2533' Minimum ID = 2.44" @ 8822' 2 7/8'- 3 1/2' XO ITOPOF 7" LNR II~ 8223' 9-5/8" CSG, 47#, LB0, .0732 bpf, ID=8.681 III 8400' ITOP OF 2-7/8" LNR- CT Id 8816' 4-1/2" TBG, 12.6#, 13Cr, .0152 bpf, ID=3.958 Id 884~' I 7" LNR, 29#, 13Cr80, .0371 bpf, ID=6.184 Id 9060' I PERFORATION SUMMARY REF LOG: SWS CL/JEWELRY 6/5/96 ANGLEAT TOP PERI=: 170 @ 9206 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8' 4 9206-9226 O 5/29/1998 2-1/8' 4 9236-9254 O 5/29/1998 2-1/8' 4 9267-9287 O 7/25/2000 2-1/8' 4 9709-9785 C 5/29/1998 2-1/8' 4 10250-10325 C 5/29/1998 2-1/8' 4 10775-10875 C 5/29/1998 09-31 c SAFETY NOTES 34' idxo 5-1/2,,x 4-1/2- I 2096' 8757' 8773' 8774' 8816' 8822' 8832' Id4-1/2" CAMTRCF-4A SSSV NIP, ID= 3.81 I GAS LIFT MANDRELS TYPEMANI LATCH I TGPDI RKI TGPDI RKI To~I TG~ I TOPe I *K I TGFO I RK I TG~ I RK I T~I ~l TGmI RKI H4- = I 1~4-1~,, ~ s~, s~ I idxo3_~=,x~_=~,,,,~==44 I I~ 4-1/2" PA~ SWS NIP, ID=3.81(B~IND LNR) 8843' H4-1/2"WL~(BEHINDLNR) I L ssso' I-I ELMD I I 7" MILLOUT WINDOW 9060' - 9066' I ~ I-I~-~'~''C'B~ I 9431' ]_~CIBPpushed down hole 7/24/2000 I 10000' H2-7/8" CTM ClBP (SET 02/04/97) 10531' Jd2-7/8" ClBP(SET 10/12/96) I 10882' 10938' I-t2-7/8" BAKER LANDING COLLAR I ~1-1 F~SH- 2-1/8" CIBP (LOST 09/25/96)I I 10945' 112-7/8" DAVIS LYNCH FLOAT SHOE I2-7/8" LNR-CT, 6.5#, L80,.0058 bpf, ID=2.441 10945' DATE REV BY COMMENTS 04/29/96 LAST WORKOVER 12/22/2000 SIS-SLT CONVERTED TO CANVAS 01/22/01 SlS-LG REVISION 04/27/01 pcr Revised for Sundry Application (conversion from MIST injector to producer) PRUDHOE BAY UNIT WELL: 09-31C PERMIT No: 96-064 APl No: 50-029-21396-03 SEC 2,TION, R15E 2601.42 FEL 980.98 FNL BP Exploration (Alaska) i i i H) F~£L. ] NE BOP 1. 5000 .PSI 7" WELLHEAD CONKI£C1OR IrLAklG 2. 5000 PSI WlRELINE RAMS (VARIABLE $12£) 3..%DDO PSI 4 1/6" LUBRICATOR 4..~000 PS~ 4 1/~" flow TUBE PACK-OFF Schlumberger Typical 4 1/16" BOPE Set-Up and attachment for Service Coil Units BOP (lO, O00psi WP) Pumping Sub (10,000psi WP) Two Gate Valves Blind/Shear Rams Blind/Shear Rams Slip Rams Wellhead ~ I1TL~JTllJI~ .~_ Swab Valve ~nion Valve ~ ~ win v , e ~ ~ Master Valve I Olq OR BEFORE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perlorate _X Pull tubing _ Alter casing _ Repair well _ Other _X (ClBP) 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__ RKB 55 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 service__x Prudhoe Bay Unit 4. Location of well at surface 8. Well number 3691' FNL, 997' FEL, Sec. 2, T1 ON, R15E, UM (asp's 717376, 5943027) 09-31Ci At top of productive interval 9. Permit number / approval number 2753' FNL, 2187' FEL, Sec. 2, T1 ON, R15E, UM (asp's 716160, 594391) 196-064 At effective depth 10. APl number 50-029-21396-03 At total depth 11. Field / Pool 981' FNL, 2601' FEL, Sec. 2, T10N, R15E, UM (asp's 715693, 5945690) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10946 feet Plugs (measured) CIBP#3 set on (7/25/2000) @ 9390' MD. true vertical 8824 feet CIBP#2 set @ 10000' MD (2/04/1997). CIBP#1 set @ 10531' MD (10/12/1996). Effective depth: measured 9390 feet Junk (measured) CIBP pushed to 9431' MD on 7/24/2000. true vertical 8848 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 111' 20" 18oo# Polyurethane 111' 111' Surface 2478' 13-3/8" 25O0 Sx CS ,~ & 4O0 Sx CS ~ 2533' 2533' Production 8345' 9-5/8" 500 Sx Class G & 300 Sx CS I 8400' 8132' Liner 837' 7" 264 cuft C~ass G 9060' 8739' Liner 2129' 2-7/8" 17.5 bbls Class G 10945' 8824' ORIGINAL Perforation depth: measured 9206' - 9226'; 9236' - 9254'; 9265' - 9285'; (Isolated below ClBPs are 9710' - 9765'; 10250' - 10270'; 10273' - 10298'; 10300' - 10325'). true vertical 8827' - 8833'; 8835' - 8838'; 8840' - 8843'; (Isolated below ClBP's are 8850' - 8846'; 8841' - 8841" 8841' - 8841'; 8841',-_88_.4,.2')~' ~.~- .... Tubing (size, grade, and measured depth) 5-1/2" Tbg @ 37' MD; 4-1/2", 12.6#, 13CR Tbg @ 8843' MD. Packers & SSSV (type & measured depth) 7" X 4-1/2" BAKER SABL-3 PACKER @ 8774' MD. ! ! I F' .-'", '.:' ,~. -..". ", -.' !L'.J' ;.' '.: 4-1/2" CAMCO TRCF-4A SSSV @ 2096' MD. 13. Stimulation or cement squeeze summary ?:~!~, (-']i'i ~ :'"'~'~ ~'"--""~"':'-: ?¥~-~;¥"~"~ ,':~ Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 15371 - 3127 Subsequent to operation 30065 3277 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run ~ Daily Report of Well Operations .__X Oil __ Gas __ Suspended __ Service __(WAG).__ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Mike Bill Prepared by Paul Rauf 263-4990 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 09-31Ci DESCRIPTION OF WORK COMPLETED SET ClBP & PERFORATING OPERATIONS Date Event Summary 3/22/2000: 7/04/2000: 7/23/2000: 7/24/2000: 7/25/2000: MITIA to 2500 psi - passed. MIRU CTU. PT'd equip. Killed well. RIH w/Mem GR/CCL logging tools & tagged BTM @ 9230' CTM. Logged f/9200' - 9100' & POOH w/logging tools. RIH & pushed obstruction @ 9230' to 9250'. POOH. Returned well to MI injection. RD. MIRU CTU. PT'd equip to 3500 psi. Loaded well down backside. RIH w/BHA to 8832' but unable to get further. POOH. LDFN. RIH & milled / pushed old CIBP f/9250' to 9431' MD. POOH. RIH w/logging tools for tie-in of CIBP placement. POOH w/logging tools. RIH w/CT & set 2-7/8" CIBP @ 9390' MD. POOH w/CT. RIH w/CT conveyed perf guns & shot 20' of Add Perforations as follows: 9265' - 9285' MD (Zone 2) Used 2" carriers & all shots @ 4 SPF, overbalanced press, random orientation, & 60© phasing. POOH w/guns. ASF. RD CTU. Placed well on MI injection & obtained representative injection data. Page 1 PERMIT AOGCC Individual Well Geological Materials Inventory DATA T DATA PLUS 96-064 DIR SURV 96-064 PERF RCD 6~4~96 96-064 10853-8500 96-064 JEWERLY 7310 96-064 GR-TVD 96-064 7412 9030-10923 96-064 TDTP 96-064 8251 ~PERRY LL~,PIA ~PIA T GR/ROP 8~94-1223~ T GR/ROP 8994-10128 ~026-10945 ~ 8655-8769 ~1,4,6,7,9,10,11,13 ~L~8750-9750 [~CHL~ TDTP Page: 1 Date: 06/09/98 RUN RE CVD 05/02/96 1 06/28/96 1 06/28/96 07/02/96 07/02/96 FINAL 07/25/96 FINAL 07/25/96 09/03/96 FINAL 01/29/98 1 01/29/98 T D 10-407 LR~OMPLETION DAT~ ~1~I I ~1 DAILY WELL OPS R ~/1~/~ / TO ~/ ~7~/ Are dry ditch samples required? yes ~___~And received? Was the well cored? yes ~__~Analysis & description received? Are well tests required?;/';yes~--~ReceiVed? -_yes no-- Well is in compliance ~j Initial COMMENTS GeoQuest 500 Wo International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11754 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Ba~ 1/27/98 Floppy LIS Well Job # Log Description Date BL RF Sepia Disk Tape D.S. 7-21 · '~..~ 98036 TDTP 971 013 I I 1 D.S. 9-31C · o~{ 98035 TDTP 971 004 I I 1 D.S. 13-05 ~'~ 97569 RST (TDT) 971201 I I 1 , , SIGNED:(~'~ ~ DATE: ~ ~, i"' ~. :..~"~ ¥'~ t~, ~ Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 562-6521. Thank you.~ . ..... ' STATE OF ALASKA ALASKA _.,_ AND GAS CONSERVATION COIv,MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1587' NSL, 998' WEL, Sec 2, T10N, R15E, UM. At top of productive interval 2526' NSL, 2187' WEL, Sec 2, T10N, R15E, UM. At effective depth At total depth 984' FNL, 2602' FEL, Sec2, T10N, R15E, UM. 5. Type of Well Development X~ Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 50' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-31C 9. Permit number/approval number 96-64 10. APl number 50 - 029-21396-03 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10946 feet 8824 feet Plugs(measured) CIBP set at 10000' MD (2/4/97). 10000 feet 8846 feet Junk(measured) Casing Length Conductor 111' Surface 2483' Production 8355' Liner 820' Liner 2129' Perforation depth: Size Cemented Measured depth 20" 1800# Polyurethane 111' 13-3/8" 2500 Sx CS III & 400 Sx CS II 2533' 9-5/8" 500 Sx CIG & 300 Sx CS I 8405' 7" 264 Cuft CIG 9054' 2-7/8" 17.5 Bbls CIG 10945' measured 9710 - 9765' true vertical 8850 - 8846' True vertical depth 111' 2533' 8136' 8734' 8824' MAR 0 7 ~997 Tubing (size, grade, and measured depth) 5-1/2" Tbg @ 37' MD; 4-1/2", 12.6#, 130R Tb~-"~,~'~E~.~0n$. Commission Anch0~age Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 8774' MD; Camco TRCF-4A SSSV @ 2096' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation - 13402 - - 3339 Subsequent to operation 44168 - - 3220 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 Title Engineering Supervisor Date ,~ .. L/Z ... ,~ '7 SUBMIT IN DUPLICATE ..... STATE OF ALASKA ALASKA _AND GAS CONSERVATION CO,-v,,vllSSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pulltubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1587' NSL, 998' WEL, Sec 2, T10N, R15E, UM. At top of productive interval 2526' NSL, 2187' WEL, Sec 2, T10N, R15E, UM. At effective depth At total depth 984' FNL, 2602' FEL, Sec2, T10N, R15E, UM. 5. Type of Well Development X_~ Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 5O' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-31C 9. Permit number/approval number 96-64 10. APl number 50 - 029-21396-03 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10946 feet 8824 feet Plugs(measured) CIBP set at 10000' MD (2/4/97). Effective depth: measured true vertical Casing Length Conductor 111' Surface 2483' Production 8355' Liner 820' Liner 2129' 10000 feet 8846 feet Junk(measured) Size Cemented Measured depth 20" 1800# Polyurethane 111' 13-3/8" 2500 Sx CS III & 400 Sx CS II 2533' 9-5/8" 500 Sx CIG & 300 Sx CS I 8405' 7" 264 Cu ft CIG 9054' 2-7/8" 17.5 Bbls CIG 10945' True vertical depth 111' 2533' 8136' 8734' 8824' Perforation depth: measured 9710 - 9765' true vertical 8850 - 8846' Tubing (size, grade, and measured depth) 5-1/2" Tbg @ 37' MD; 4-1/2", 12.6#, 13CR Tbg @ 8843' MD. Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 8774' MD; Camco TRCF-4A SSSV @ 2096' MD. 13. Stimulation or cement squeeze summary 14. RECEIVED Intervals treated(measured) see Attached Treatment description including volumes used and final pressure ' i'l ~ -, ... , C...'Jt :~.s bt,'Illl Repre,entative Daily Averacje Production ~I1C 1'8.f OiI-Bbl Gas-Mcf Water-Bbl Casmgr~reCsure Tubing Pressure Prior to well operation - 6662 - 2003 Subsequent to operation i4899 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations X Oil X Gas Suspended. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Service 35O5 Form 10-404 Rev 06/15/88 Title Engineering Supervisor Date ..3 - / / -7,7 SUBMIT IN DUPLICATE 9-31C DESCRIPTION OF WORK COMPLETED ClBP #2 INSTALLATION & ADD PERFORATIONS 2/4/97: RIH & set a CIBP in the 2-7/8" liner at 10000' MD, to isolate the open perforations at: 10250 - 10270' MD (Z2C) 10273 - 10298' MD (Z2C) 10300 - 10325' MD (Z2C) PT ClBP to 2000 psi; tested OK. Rigged down. 2/6/97: RIH w/perforation guns & shot 55' of add perforations at: 9710 - 9765' MD (Z2) Used 2-1/8" carriers & shot all perforations at 4 spf at 180 degree phasing. POOH w/perf guns. Noted all shots fired. RDc Placed the well on MI & obtained a valid injection rate. Note: Future event sequence to complete the MI project: * Finish injecting the third MI / PWI cone. * Set a third CIBP to isolate all perf intervals. * Add Z2C perforations above third CIBP. * Inject a fourth MI / PWI cone. * Set a fourth CIBP to isolate all perf intervals. * Add Z3 & Z4 perforations & place the well on production (- 4/97). Alaska 0il & 6as Cons. Oon~m~ssiorj Anch0ra§e 9-31C DESCRIPTION OF WORK COMPLETED MUD ACID STIMULATION TREATMENT 2/1 7/9 7: Performed a Fullbore Mud Acid Stimulation treatment to improve MI rates as follows: MIRU & PT equipment to 5200 psi. Pumped stimulation fluids to treat the open perforation interval located at: 9710 - 9765' MD (Z2) Pumped: a) 25 bbls Meth Water @ 5 bpm, followed by b) 150 bbls 2% NH4CI Water @ 8 - 10 bpm, followed by c) 51 bbls Diesel/Xylene @ 5 bpm, followed by d) 100 bbls 12% HCI @ 5 bpm, followed by e) 50 bbls 9% HCI- 1% HF @ 5 bpm, followed by f) 50 bbls 12% HCI @ 5 bpm, followed by g) 355 bbls 1% NH4CI Water @ 5 - 7 bpm, followed by h) 25 bbls Meth Water @ 5 bpm, followed by i) Shutdown. Rigged down & resumed MI of injection cone #3. Pending events to complete the 9-31C MI project: * Finish injection of third MI / PWI cone. * Set third CIBP to isolate all perf intervals. * Add Z2C perforations above third CIBP. * Inject fourth MI / PWI cone. * Set fourth CIBP to isolate all perf intervals. * Add Z3 & Z4 perforations & place the well on production. ---' f~' STATE OF ALASKA ALAS~ ,,~ ,..,~ AND GAS CONSERVATION L;OM~vllSSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate X Pull tubing Alter casing 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1587' NSL, 998' WEL, Sec 2, T1 ON, R15E, UM. At top of productive interval 2526' NSL, 2187' WEL, Sec 2, T10N, R15E, UM. At effective depth At total depth 984' FNL, 2602' FEL, Sec 2, T10N, R15E, UM. Repair well 5. Type of Well Development ,~ Exploratory '1 Stratigraphic ~.~ Service Other X 6. Datum of elevation(DF or KB) 5O' RKB 7. Unit or Property Prudhoe Bay Unit I 8. Well number 9-31C 9. Permit number/approval number 96-64 10. APl number 50 - 029-21396-03 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10946 feet 8824 feet Plugs(measured) CIBP set at 10531' MD (10/12/96). Effective depth: measured 10531 feet true vertical 8835 feet Junk(measured) Casing Length Size Cemented Measured depth Conductor 111' 20" 1800# Polyurethane 111' Surface 2483' 13-3/8" 2500 Sx CS III & 400 Sx CS II 2533' Production 8355' 9-5/8" 500 Sx CIG & 300 Sx CS I 8405' Liner 820' 7" 264 Cuft CIG 9054' Liner 2129' 2-7/8" 17.5 Bbls CIG 10945' True vertical depth 111' 2533' 8136' 8734' 8824' Perforation depth: measured 10250 - 10270'; 10273 - 10298'; 10300 - 10325' true vertical 8841 - 8841'; 8841 - 8841'; 8841 - 8841' Tubing (size, grade, and measured depth) 5-1/2" Tbg @ 37' MD; 4-1/2", 12.6#, 13CR Tbg @ 8843' MD. Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 8774' MD; Camco TRCF-4A SSSV @ 2096' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached 3/~t~ 0 7 '~997 Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection OiI-Bbl Gas-Mcf Water-Bbl Casing Pressur~-"""'"'""'-~'Tubing Pressure Prior to well operation see attach. - - see attach. Subsequent to operation see attach. 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations X Oil Gas Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. see attach. Service Injector ~igned ¢,,~ '~'Vl, . ~ Title Engineering Supervisor Date /- ~,- ?'7 Form 10~404 Rev 06/15/88 SUBMIT IN DUPLICATE 9-31C DESCRIPTION OF WORK COMPLETED MI STIMULATION PROJECT OPERATIONS A Horizontal MI Stimulation project has been in progress on 9-31C since the wells initial completion date of 6/4/96. Due to an extended time length involved to fully complete this project, an interim summary is given here to report the project operations performed to date. Another report will be submitted following completion of this project expected during 4/97. 6/10/96 - 8/21/96: Injected cone #1 total of +/- 2.1 Bcf of MI at 20 - 35 MMscfD & 2700 - 3300 whip, through the perforation interval at: 10775 - 10875' MD (Z2C) 8/22/96 - 10/11/96: Well on PWI at an average of 1000 BWPD through the perforations (above). I 0/1 2/96: RIH & set a ClBP in the 2-7/8" liner at 10531' MD, to isolate the perforation interval (above). I 0/1 4/96: RIH w/perforation guns & shot add perforations at: 10250 - 10270' MD (Z2C) 10273 - 10298' MD (Z2C) 10300 - 10325' MD (Z2C) Used 2-1/8" carriers & shot all perforations at 4 spf at zero degree phasing. 10/15/96 - 1 1/4/96: Well on MI at 5 - 9 MMscfD & 3000 - 3300 whip, injecting through the perf intervals (above). 1 1/5/96: Performed a Fullbore Acid Stimulation treatment to improve MI rates as follows: MIRU & PT equipment. Pumped stimulation fluid sequence: a) 150 bbls 1% NH4CI Water @ 10 bpm, followed by b) 45 bbls Diesel /Xylene, followed by c) 100 bbls 12% HCl w/10% Xylene, followed by d) 50 bbls 9% HCl - 1% HF, followed by e) 55 bbls 12% HCl w/10% Xylene, followed by f) 318 bbls 1% NH4Cl Water, followed by g) Shutdown. RD & returned well to MI. I 1/5/96 - 12/27/96: Injected cone #2 total of +/- 1.9 Bcf of MI at 30 - 44 MMscfD & 2900 - 3300 whip. Pending events to complete this project: * Swap well to PWI & inject about 2 weeks. * Set second CIBP to isolate all perf intervals (above). * Add Z2C perforations above second ClBP. * Inject third MI / PWI cone. * Set third ClBP to isolate all perf intervals. * Add Z2C perforations above third ClBP. * Inject fourth MI / PWl cone. * Set fourth ClBP to isolate all perf intervals. * Add Z3 & Z4 perforations & place the well on production. 0 I:t I I_1_11M G S E I::IL~ I r' ~ S WEIJ~ LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - DS 09-31C AK-MW-60043 September 03, 1996 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ JLm Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted magnetic tape with LIS listing. S Z? 0 $ i'.3.96 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company O I=t I I__ll r~ CS ES EE i~t L/I r- l= S WELL LOG TRANSMITTAL To: State of Alaska July 25, 1996 Alaska Oil and Gas Conservation Comm. f~ f (Qff¢ ¢ Attn.: Howard Okland / 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - DS 09-31 C, RE: AK-MW-60043 -' The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 DS 09-31C: 2" x 5" MD Gamma Ray Logs: 50-029-21396-03 2"x 5" TVD Gamma Ray Logs: 50-029-21396-03 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia ,JUL 2 5 Oil & Gas Cons. Oomm~ion Anchorage 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA A_, ~SKA OIL AND GAS CONSERVATION COk,,,41SSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well O~L I--I GAS I%] SUSPENDED I--I ABANDONED 1'--I SERWOE I~1 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 96-64 3 Address 8 APl Number P.O. Box 100360, Anchorage, AK 99510-0360 50-029-21396-03 4 Location of well at surface . 9 Unit or Lease Name A 1587' NSL, 998' WEL, Sec 2, T10N, R15E UM ....................... r~ I ~T' .{¢-~., ~ PRUDHOE BAY UNIT f · . r L;: ; ..._.',* ~ 10 Well Number At Top Producing Interval 2526' NSL, 2187' WEL, Sec 2, T10N, ,15E UM_~/~_~'d~~., ,,~=~-.-~,,~-,,-~-' ,, ' 9-310 AtTotal Depth · , ..~,,kci[_..0 ~~~ 11 Field and Pool 5 Elevation in feet (indicate KB, DF, etc.) -6~'~;~l~esignation and Serial No. PRUDHOE BAY OIL POOL RKB 50' ADL 28324 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. 15 Water Depth, if offshore J16 No. of Completions 4/12/96. 4/26/96. 6/4/96 (Initial Perfs). N/A feet MSLI 1 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 120 Depth where SSSV set 21 Thickness of permafrost 10946' MD / 8768' TVD 10900' MD / 8825' TVD YES [~ NO [~I 2096' feetMD 1900'(approx) 22 Type Electric or Other Logs Run GR, MWD. 23 CASING, LINER AND CEMENTING RECORD SE-I-FING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5 ¢ H-40 Surf 111' 30" 1800 ¢ Polyurethane 13-3/8" 72 ¢/68 ¢ L-80/K-55 Surf 2533' 17-1/2" 2500 sx CS III & 400 sx CS II 9-5/8" 47.0 ¢ L-80 Surf 8405' 12-1/4" 500 sx G & 300 sx CS I 7" 29.0 ¢ L-80/13CR 8234' 9054' 8-1/2" 264 cuft Class G 2-7/8" 6.5#/9.3¢ L-80 8816' 10945' 3-3/4" 17.5 bbls Cmt 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 8843' 8774' 10775 - 10875' M D; 8828 - 8825' TVD at 4spf. 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27 PRODUCTION TEST Date First Production JMethod of Operation (Flowing, gas lift, etc.) N/A I Placed on Miscible Injection: 6/7/96 (Initial MI rates: 30 MM/Day @ 3300 psi). Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE J GAS-OIL RATIO I TEST PERIOD FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press- 24-HOUR RATE 28 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. · NOTE: 9-31C Coil Tubing Sidetrack Drilling Operations Summary attached. RECEIVED ORIGINAL12 199t; Alaska Oil & ~as Oon~. Oommission Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MAF{K~RS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 8946' 8638' N/A 31. LIST OF A'U'ACHMENTS Summary of 9-310 Coil Tubin~l Sidetrack Drilling Operations. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge / INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item27: Method of Operation' Flowing, GasUft, Rod Pump, Hydraulic Pump, Submersibl~i~.~;~li- jection, Gas Injection, Shut-in, Other-explain. V D Item 28: If no cores taken, indicate "none". Form 10-407 9-31C DESCRIPTION OF WORK COMPLETED COIL TUBING DRILLED SIDETRACK OPERATIONS 4/1 2/96: Drilled pilot hole through cement plug from 9026' to 9095' MD. POOH w/BHA. RIH w/window milling BHA. Started milling a window through the 7" liner at 9096' MD. 4/1 3/9 6: Continued milling window to 9103' MD. POOH w/CT minus mill. RU & RIH w/fishing tools. Attempted to fish mill. POOH without fish. RIH w/nozzle & jetted pilot hole. POOH w/CT. 4/1 4/96: RIH w/overshot; couldn't latch fish. POOH & ran LIB which showed picture of cement fill. Ran pump bailer to recover some cement & metal fill, then RIH w/overshot. Couldn't latch fish. POOH w/overshot. RIH w/cementing nozzle to bottom displacing wellbore to Hot 1% KCI Water. Pumped 6 bbls Fiber Cement on top of fish, followed by biozan. Jetted contaminated cement to dress cement plug to 9005' MD. POOH & WOC. 4/15/96: WOC. RIH w/milling BHA. Drilled pilot hole w/high side ramp through cement to 9055' MD. POOH w/BHA. MU & RIH w/window milling BHA. Started milling a window through the 7" liner at 9054' MD. 4116196: POOH w/BHA to check tools. PT tools. MU & RIH w/window milling BHA. 4/1 7~96: Finished milling window to 9063' & drilled formation to 9068' MD. Backreamed window, then POOH w/BHA. MU & RIH w/drilling BHA. Drilled 3.75" sidetrack hole to 9151' MD. 4/1 8/96: Drilled build section from 9151' to 9295' MD. POOH w/BHA. swapped well over to FIo-Pro. Continued drilling to 9510' MD. MU & RIH w/drilling BHA & POOH w/BHA. 4/1 9/96: MU & RIH w/drilling BHA. Drilled from 9512' to 9616' MD. w/drilling BHA & drilled horizontal hole to 9708' MD. POOH w/BHA. MU & RIH 4120196: Drilled from 9708' to 10005' MD. POOH w/BHA. MU & RIH w/drilling BHA. 4/21/96: Drilled from 10005' to 10300' MD. Hi-Vis sweep & jarred on pipe. Short tripped & BHA stuck at 10124' MD. Circulated a Circulated & attained movement between 10084 - 10122' MD. 4122196: PU bit to 10084' MD; pipe stuck. Worked to free pipe w/o success. Brought on pump & BHA unstuck. RIH to 10280' MD. Attempted to disconnect from BHA; disconnect wouldn't release. Cut CT at surface. RIH w/cutter. CT fell in slips. POOH w/cutter. Screwed into CT connector & PU coil to rig floor. 4123196: RIH pumping down chemical cutter. Fired cutter at 10160' MD. Swapped out 2" CT reels. RU new CT reel. POOH w/cutter & POOH w/CT. 9-31C DESCRIPTION OF WORK COMPLETED COIL TUBING DRILLED SIDETRACK OPERATIONS 4/24/96: MU & RIH w/cleanout BHA. Washed & circulated fill from hole to 10198' MD. RIH w/fishing BHA; couldn't pass dogleg at 9280' MD. POOH w/fishing tools. 4/25/96: Latched & POOH w/fish from 10245' MD. to 10545' MD. 4126196: Drilled from 10545' to TD at 10946' MD. MU & RIH w/drilling BHA. POOH w/BHA. RIH w/overshot. Continued drilling hole 4/27/96: Made wiper trips from 10946' MD then POOH w/BHA. MU & RIH w/liner assembly. Worked the 2-7/8" liner to 10945' MD. Pumped 17.5 bbls of 15.8 ppg Cement to set the liner from 8822' to 10945' MD. Followed cement w/biozan, landed liner plug, unstung CT off T©L, and POOH displacing well from FIo-Pro to Seawater. RIH w/nozzle to 10900' MD. Jetted liner w/Seawater & POOH w/nozzle circulating Seawater. Rigged down. RIH w/CTE perforating guns & shot 40' of initial perforations at: 6/4/96: MIRU & PT equipment. 10835 - 10875' MD (Z2) Used 2-1/8" carriers & shot 4 spf at 180 degree phasing at balanced pressures. POOH w/perf guns. Rigged down. RIH w/CTE perforating guns & shot 60' of initial perforations at: 615196: MIRU & PT equipment. 10775 - 10835' MD (Z2) Used 2-1/8" carriers & shot 4 spf at 180 degree phasing at overbalanced pressures. POOH w/perf guns. Rigged down. Placed the well on miscible injection and obtained a valid injection rate. RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA INC PBU/9-31C 500292139603 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 DATE OF SURVEY: 042796 MWD SURVEY JOB NUMBER: AK-MW-60043 KELLY BUSHING ELEV. = 55.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 8947.00 8642.00 8587.00 8979,00 8669.93 8614.93 9010.00 8696.53 8641.53 9042,00 8723.64 8668.64 9057,32 8736.40 8681.40 28 23 29 58 31 48 32 25 34 43 N 38.10 E .00 939.30N 1188.70W N 40.80 E 6.40 951.34N 1178.78W N 40.30 E 5.99 963.43N 1168.44W N 40,80 E 2.08 976.36N 1157.38W N 36.30 E 22.11 982.98N 1152.11W 1184,61 1194.08 1203.51 1213.59 1218.84 9060.54 8739.04 8684.04 9068.00 8745.02 8690.02 9075.32 8750,71 8695.71 9083.67 8756,99 8701.99 9100.48 8768.86 8713.86 35 35 37 47 39 59 42 37 47 28 N 35.30 E 32.67 984.49N 1151.03W N 32.91 E 35.04 988.18N 1148.53W N 30.80 E 35.08 992.08N 1146,11W N 28.10 E 38.14 996.88N 1143.40W N 23.20 E 35.45 1007.61N 1138.27W 1220.06 1223.09 1226.34 1230.40 1239.68 9129.77 8787.75 8732,75 9144.67 8796.76 8741,76 9165.44 8808.64 8753,64 9176.09 8814.19 8759.19 9190.07 8820.69 8765.69 52 18 53 17 57 2 6O 7 64 25 N 14.42 E 28.22 1028.79N 1131.12W N 7.50 E 37.56 1040.43N 1128.87W N .06 E 34.49 1057.42N 1127.78W N .41 E 29.06 1066,51N 1127.74W N 3.40 E 36.11 1078.87N 1127.32W 1258.69 1269.52 1285.81 1294.65 1306.60 9205.72 8826.82 8771.82 9219.44 8831.13 8776.13 9237.27 8835.16 8780.16 9255.49 8838.34 8783.34 9282.64 8842.31 8787.31 69 25 74 0 79 53 79 58 83 13 N 6.74 E 37.55 1093.20N 1126.04W N 8.50 E 35.46 l106.11N 1124.31W N 13.94 E 44.43 1123.13N 1120.92W N 10.01 E 21.24 1140.68N 1117.20W N 3.75 E 25.76 1167.33N 1113.99W 1320.27 1332.45 1348.25 1364.50 1389.72 9306.39 8844.46 8789.46 9320.24 8845.23 8790.23 9335.57 8845.96 8790.96 9356.74 8846.90 8791.90 9390.69 8848.41 8793.41 86 24 87 11 87 21 87 32 87 21 N 2.34 E 14.60 1190.94N 1112.74W N 1.88 W 30.95 1204.77N 1112.68W N 2.76 W 5.84 1220.07N 1113.30W N 2.93 W 1.17 1241.19N 1114.35W N 2.40 W 1.65 1275.07N 1115.93W 1412.44 1425.89 1440.93 1461.74 1495.09 9438.52 8850.72 8795.72 9520.57 8854.69 8799.69 9552.59 8855.72 8800.72 9584.17 8856.13 8801.13 9624,02 8856.07 8801.07 87 87 88 89 9O 5 21 56 33 37 N 5.04 W 5.54 1322.74N 1119.03W N 6.45 W 1.75 1404.27N 1127.23W N 10.14 W 12.53 1435.94N 1131.85W N 12.60 W 8.03 1466.89N 1138.07W N 13.17 W 3.02 1505.73N 1146.96W 1542.22 1623.49 1655.37 1686.93 1726.78 9663.99 8854.29 8799.29 9694.17 8851.56 8796.56 9713.12 8849.69 8794.69 9744.09 8847.31 8792.31 9773.97 8846.05 8791.05 94 29 95 54 95 24 93 26 91 21 N 14.96 W 10.67 1544.46N 1156.66W N 16.64 W 7.25 1573.37N 1164.84W N 16.92 W 3.02 1591.43N 1170.29W N 19.15 W 9.57 1620.78N 1179.84W N 20.16 W 7,74 1648.89N 1189.88W 0 2 Oil & 6as Co~s. ComPri ^nch_orage 1766.69 1796.71 1815.53 1846.29 1875.94 S~ RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA INC PBU/9-31C 500292139603 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 DATE OF SURVEY: 042796 MWD SURVEY JOB NI3MBER: AK-MW-60043 KELLY BUSHING ELEV. = 55.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9803.92 8845.71 8790.71 9833.89 8845.87 8790.87 9864.37 8846.30 8791.30 9894.04 8846.96 8791.96 9924.07 8847.28 8792.28 89 58 89 24 88 58 88 27 90 18 N 22.66 W 9.55 1676.77N 1200.82W N 23.41 W 3.12 1704.35N 1212.54W N 23.27 W 1.48 1732.33N 1224.62W N 24.28 W 3.83 1759.48N 1236.57W N 22.64 W 8.23 1787.02N 1248.53W 1905.57 1935.10 1965.09 1994.24 2023.77 9953.97 8847.02 8792.02 9984.02 8846.64 8791.64 10023.99 8846.24 8791.24 10055.99 8845.56 8790.56 10085.62 8844.51 8789.51 90 40 90 48 90 20 92 6 91 55 N 24.39 W 5.98 1814.43N 1260.45W N 25.15 W 2.56 1841.71N 1273.04W N 27.85 W 6.85 1877.48N 1290.88W N 29.12 W 6.81 1905.59N 1306.13W N 30.18 W 3.63 1931.32N 1320.78W 2053.18 2082.60 2121.48 2152.33 2180.72 10118.37 8843.21 8788.21 10144.69 8841.99 8786.99 10171.67 8840.94 8785.94 10190.02 8840.61 8785.61 10220.07 8840.55 8785.55 92 38 92 38 91 50 90 13 90 0 N 32.64 W 7.81 1959.25N 1337.83W N 33.52 W 3.34 1981.28N 1352.18W N 32.99 W 3.56 2003.82N 1366.96W N 33.12 W 8.86 2019.19N 1376.97W N 33.45 W 1.32 2044.31N 1393.46W 2211.78 2236.49 2261.80 2279.05 2307.25 10230.12 8840.56 8785.56 10285.34 8841.07 8786.07 10317.49 8841.47 8786.47 10353.57 8841.03 8786.03 10383.99 8839.95 8784.95 89 54 89 1 89 33 91 50 92 11 N 32.64 W 8.11 2052.74N 1398.94W N 37.03 W 8.11 2098.05N 1430.47W N 38.79 W 5.72 2123.41N 1450.22W N 36.50 W 8.96 2151.97N 1472.25W N 33.87 W 8.72 2176.82N 1489.77W 2316.70 2367.99 2397.17 2429.99 2458.16 10414.22 8839.02 8784.02 10442.84 8838.33 8783.33 10475.32 8837.38 8782.38 10506.69 8836.34 8781.34 10535.32 8835.47 8780.47 91 19 91 26 91 55 91 50 91 40 N 32.11 W 6.51 2202.16N 1506.22W N 30.42 W 5.92 2226.61N 1521.07W N 28.42 W 6.33 2254.89N 1537.01W N 25.08 W 10.65 2282.88N 1551.12W N 23.67 W 4.96 2308.94N 1562.93W 2486.57 2513.76 2544.91 2575.38 2603.44 10568.97 8834.34 8779.34 10596.52 8833.14 8778.14 10625.64 8831.91 8776.91 10656.07 8831.00 8776.00 10688.87 8830.37 8775.37 92 10 92 48 92 1 91 24 90 47 N 21.81 W 5.73 N 19.10 W 10.09 N 16.12 W 10.58 N 13.30 W 9.48 N 11.37 W 6.18 2339.96N 1575.93W 2365.74N 1585.55W 2393.47N 1594.35W 2422.89N 1602.07W 2454.92N 1609.08W 2636.60 2663.89 2692.89 2723.30 2756.08 10718.17 8829.79 8774.79 10748.62 8828.80 8773.80 10777.67 8827.96 8772.96 10809.84 8827.39 8772.39 10840.37 8826.67 8771.67 91 29 92 11 91 8 90 52 91 50 N 8.03 W 11.64 N 4.86 W 10.66 N 2.76 W 8.09 N .47 W 7.16 N 3.04 E 11.92 2483.79N 1614.01W 2514.03N 1617.43W 2542.99N 1619.36W 2575.14N 1620.26W 2605.65N 1619.58W 2785.32 2815.54 2844.19 2875.71 2905.26 SP} .Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 ARCO ALASKA INC PBU/9-31C 500292139603 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 DATE OF SURVEY: 042796 MWD SURVEY JOB NUMBER: AK-MW-60043 KELLY BUSHING ELEV. = 55.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10872.67 8825.70 8770.70 91 34 N 6.03 E 9.29 10905.67 8824.89 8769.89 91 13 N 8.50 E 7.56 10930.02 8824.42 8769.42 90 58 N 9.55 E 4.44 10943.00 8824.21 8769.21 90 54 N 10.10 E 4.27 2637.83N 1617.03W 2936.02 2670.55N 1612.86W 2966.94 2694.59N 1609.04W 2989.49 2707.38N 1606.82W 3001.44 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 3148.30 FEET AT NORTH 30 DEG. 41 MIN. WEST AT MD = 10943 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 346.88 DEG. TIE IN POINT 8947' WINDOW POINT 9068' INTERPOLATED DEPTH 10943' SP< ~XY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 ARCO ALASKA INC PBU/9-31C 500292139603 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 DATE OF SURVEY: 042796 JOB NUMBER: AK-MW-60043 KELLY BUSHING ELEV. = 55.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 8947.00 9947.00 10943.00 8642.00 8587.00 8847.11 8792.11 8824.21 8769.21 939.30 N 1188.70 W 305.00 1808.08 N 1257.58 W 1099.89 794.89 2707.38 N 1606.82 W 2118.79 1018.89 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 ARCO ALASKA INC PBU/9-31C 500292139603 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/ 1/96 DATE OF SURVEY: 042796 JOB NUMBER: AK-MW-60043 KELLY BUSHING ELEV. = 55.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 8947.00 8961.76 9081.18 9528.10 8642.00 8587.00 8655.00 8600.00 8755.00 8700.00 8855.00 8800.00 939.30 N 1188.70 W 305.00 944.82 N 1184.41 W 306.76 1.76 995.63 N 1144.24 W 326.18 19.42 1411.74 N 1128.15 W 673.10 346.92 9567.00 8855.99 8800.99 1450.12 N 1134.39 W 711'.01 37.91 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10253 Company: Alaska Oil & Gas Cons Comm Attn: Howard Okland 3001 Porcupine Drive Anchorage, AK 99501 6/24/96 Field: Prudhoe Bay Anadrill Anadrill Anadrill Floppy Well Job # Log Description Date BL RF Sepia Survey Program Performance Dis~" i' Calculation Letter p.S. 4'19 96057 iDUAL BURSTTDT-P 960.2.09 1 D.S. S-aA 96110 I DUAL BURST TDT-P (BORAX) 960405 1 'D.S. 15-42 "~ 96147 . DUAL BURST T.D.T-P (BORAX) 960.5.!2 1 D.S. 1-10 o '/ LEAK DETECTION LOG 960609 I 1 D.S. 2-8A ~ PRODUCTION PROFILE LOG 960608 I 1 , , .D...S. 5-16A . -(.,,~{ LEAK DETECTION .L. OG 960610 I 1 D.S. 7-19 .- PRODUCTION PROFILE LOG 960611 1 1 , , D_.S. 9-31C ' ~ JEWELRYLOG 960604 I 1 D.S. 9-31 C¢.~ . PERFORATION RECORD 960604 I 1 D.S. 11-16ST1 COMPENSATED NEUTRON LOG 960605 1 1 ,, D.S. 11 '17 - ~ LEAK DETECTION LOG 96061 0 I 1 D.S. 12-23 LEAK DETECTION LOG 960607 1 1 D.S. 12-25 -' INJECTION PROFILE LOG 960605 I 1 D.S. 13-15 / LEAK DETECTION LOG 960606 I 1 D.S. 13-25 , INJECTION PROFILE LOG 960606 I 1 D.S. 14-31 ~ LEAK DETECTION LOG 960609 I I Please sign and return one copy of this transmittal to Sherrle at the above address. Thank you. JUI' 2 8 Alaska Oil & G. s ¢0r s. C0mmissi0n Anchora§e 0 F! I I--I-- I I~1G S~FIL/I C ~: S May 2, 1996 AOGCC Larry Grant 3001 Porcupine Dr Anchorage, AK 99501 Re: Distribution of Survey Data 9-3 lC Dear Mr. Grant, Enclosed are two hard copies of the above mentioned file(s). Well 9-31C MWD survey, tied in at 8947', window point 9068', interpolated depth at 10943' Please call me at 563-3256 if you have any questions or concerns. Regards, - ,.~ ///' .. / . Sandra Lu~n Dept. Specialist Attachments. MAY 0 2 1~$ ~ask8 0tl & Oa~ Cons. ¢ommia~n gnchora.qe 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company ~KA OIL AND GAS , CONSERVATION COMMISSION ., .ir TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 April 1, 1996 Erin M. Oba, Engineering Supervisor ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Prudhoe Bay 9-3 lC ARCO Alaska, Inc.- · Permit No. 96-64 Sur. Loc 1587'NSL, 998'WEL, Sec. 2, T10N, R15E, UM Btmhole Loc. 967'FNL, 2574'FEL, Sec. 2,.T10N, R15E, UM Dear Ms. Oba: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman ~ BY ORDER OF TIlE COMMISSION dlffEnclosure CCi Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA /-u_ASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of Work Drill __ Redrill X lb. Type of Well Exploratory__ Stratigraphic Test _ Development Oil _ Re-Entry__ Deepen _ Service ~ Development Gas __ Single Zone ~ Multiple Zone _ 2.. Name of Operator 5.Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 50' 3. Address 6. Property Designation P. O. Box 100360, Anchorage, AK 99510-0360 ADL~ .2--~.~.2.-7 Prudhoe Ba¥/Prudhoe Bay Oil 4. Location of well at surface 7. Unit or property Name 11, Type Bond (see 20 AAC 25,025) 1587' NSL, 998' WEL, Sec 2, T10N, R15E, UM. Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 2526' NSL, 2187' WEL, Sec 2, T10N, R15E, UM. 9-31C #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 967' FNL, 2574' FEL, Sec 2, T10N, R15E, UM. April 1, 1996 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 830' to well 9-35A 11000' MD / 8845' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 9060' MD Maximum hole angle 90° Maximum surface 2800 psig At total depth (TVD) 3500 psig 18. Casing program Setting Depth size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2-7/8" 6.4 L80 FL4S 2700' 8800' 8535' 11000' 8845 30 bbls 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 9763 feet Plugs(measured) PBTD tagged at 9405' MD (10/25/94). true vertical 9048 feet true vertical 8996 feet :.;. ; ... JVI" Casing Length Size Cemented Measured depth True Vertical depth ,",", 2 7 1996 Conductor 1 1 I ' 2 0" 1800# Polyurethane 1 1 1 ' 1 1 1 ' Surface 2483' 13-3/8" 2500 Sx CS III & 400 SxCS II 2533' 2533' Production 8355' 9-5/8" 500 Sx Cl G & 300 Sx CS I 8405' 8136' Liner I 1 82' 7" 264 cuft CIG 9394' 8988' Arlchor~,ge Perforation depth: measured 8989 - 9007'; 9038 - 9048'; 9055 - 9065'; 9252 - 9254'; 9273 - 9275'; 9287 - 9289'; 9322 - 9340'; and Open Hole: 9405 - 9820' true vertical 8679 - 8694'; 8720 - 8728'; 8734 - 8742'; 8889 - 8890'; 8904 - 8905'; 8908 - 8910'; 8934 - 8948'; and Open Hole: 8996 - 9048' 20. Attachments Filing fee x Property plat __ BOP Sketch ~x Diverter Sketch _ Drilling program Drilling fluid program~ Time vs depth pict_ Refraction analysis __ Seabed report _20 AAC 25.050 requirements _ 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ¢~.._~ '"~ . ~ Titlle Engineering Supervisor Date ~'/,2-7/~---~ Commission Use Only m~,~ I APInumber ~ Appr~d~..ate J See cover letter for Per mb~., ~-~ 50-42 '~ ~'-.-- ~-//,~ ¢~~" / '~ ~ ~ I other requirements Conditio-'-ns of app"oval Samples required __Y e s ~' N o Mud Icg required__ Y e s ~' N o Hydrogen sulfide measures ~ Y e s N o Directional survey required ~Yes __ N o Required working pressure forBOPE __2M; __ 3M' __ 5M' __ 10M' __ 1 5 M 35OO psi for CTU Other: Origin¢ Signed By, David W. J0hrlst0ri by order of /,.~//~ Approved by Commissioner the commission Date ission Form 10-401 Rev. 7-24-89 in triplicate DS 9-31C CT Sidetrack and Completion Intended Procedure Objective: Plugback existing wellbore. Directionally drill a horizontal well from the existing wellbore. Complete with 2-7/8" cemented liner. Intended Procedure: Cement squeeze the current perforations and plugback the existing completion to ~ 9030' md. Mill window in 7" casing at ~9060' md. Drill 10' of formation and perform Leak off test to 0.5 ppg above the highest anticipated mud weight. Build angle to ~90°. Directionally drill 3-3/4" x 2000' horizontal well to access Victor reserves. Run and cement 2-7/8" liner to TD. Perforate selected intervals. Place well on MI for approximately 9 -18 months. Well will be returned to production from the Victor after the injection cycles have been completed. March 27, 1996 DS 9-31 C Proposed CT Sidetrack Horizontal 4-1/Z" Tubing 7" Liner Top ~ 8Z41' X Nipple 8757' Packer 8774' SWS Nipple 883Z' Tbg Tail 8843' Pkr @ 9Z70' ELM SWS Nipple 9Z83' Tbg Tail 92_89' 9-5/8" Casing Window @ 8400 - 8450' Top of 2-7/8" Liner in 4-1/2" Tbg. tail. Initial Perfs~ zOO' %%%%%%%%%%%%%%%%%%%%% %,,,%,..%¢."-~,'~,,,.%.,,% % % % % % % % % % % % % cut in 7" at 9055 - 9060' 3-3/4" Open hole %%%%%%%%%%%%% %%%%% 2-7/8" liner TD @ ~ 11000' 7"x 4-1/Z" Conc. Shoe 9398' Open Hole and current perforations cement squeezed Tab ]ST-02,XLS 3/25/96 3:50 PM ~,R'co 9-31 C SIDETRACK MARCH 25, t 996 PLAN PREPARED FOR STEVE WARD (P.E, Arco Alaska) .. Case 2 i .......... T'" ......................... , ........... ~ : .............................. 7 ........................... ~ ..................................................................................... : VERTICAL SECTION.USED 329.37° Relative off of true Noah ~ ............................................................................................................ ; · , ..................................................................... RKB i '55' N~'~E- .............................................. ~- ........... ' RelatiVe c0ordinat~'are' ~)ff of'true"N(~r~-~)"~sP ai;e relative to grid No~t'~ .............. , _.__~ ................................. ; ............... .J ................................................................... Note: This Plan takes into account the difficulty of building thru zone 3 and incorporates a reduction of build of 50% thru zone 3. ......................................... . ....................... ~ ~ ~ .......................................... MD; Inc.: Bit $SDEPTH VS} Nt-S EI-W Build Turn Dogleg; AsP'O'[ ASP .......................................................................... ~ ; ............... ; ................................ fi; dell dell fl ,.,. fl ff deg/1OO deg/100' deg/100! 8947.'~'! .......... ~-§-~-i-'?........... ~8'~'~-- ....... ~-I~8710':' ,"~'~'~'i'~'7 ......... §~-9~;~-'--1'~ 8'~'i~~. ....... ~310' 0'i-01 ........ O' O[ 5943956~ 8970.0' 28.4 38.1 8607.3 1417,91 948.0 -1181.9 0.0 0.0: O,Oi 5943965.0 '900'0'.'~~ 28,4 38,1 8633.7. 1423.0 i 959.21 -1173.1i 0,0 0.0 0.0: ............. .,_ ......................................... .._ ......................... ....................... . ..................... ' , ~ . 9030.0, 28 4 38.1 8660,1 1428.2i 970.4; -1164.3~ 0,0 0.0 0.0~ 5943988.01 ........ '~b~o'ioi .... 28,4 ............. 381i ........... 8686.'5~ 'i'433'.'4: 98116' -i'1"~,~'i'§'! ..... --'~i~3'-'- ...... ~'i~"-- .... -~'~'~-~'"'"-5943999'.5', 9090.0: 37.3 26.6 8711-'17'i 1440.9 995.4 -1147.1" 29.6 -38,3', 36.0 .6944013.5 716220,5 9098.1 39,8. 24,3 8718.01 1443.7'. 9999` -'1'!4419} .... 3'1-i'4'i ..... '~28'i4: ...... ~'.'[J"7'-~94--~-i"~.'0 ...... 716'22'21'5-"~;'-~-15'"qf-~r°ne'3 ..................... , ........................... ~ ..................... ? ........................ ~ ...................... ~ ................................... ~ ............................ 9120,0 42.9' 20,6: 8734.5!i 1452.4 1013,3 -1139.4! 14.1 -17,0 - i8.01', 5944031,5 716227.6 .... ]}~-~-(j:~ ........ 4,~i'~'~- ...... ~-0'i ....... ~:742:0! 1457.0' 1020.11 -1137'.0i '14.4: -15.61 18.0 : i '__ .............. i .......... ; .............. ~ ......... 9150.0, 51.3~ 19,0~ 8755.1 ~ 1466.4 1033.8; -1132.2i 35.5: O.Oi 35.5 ................. ~ ................ ~ ............. 9180.0~ 62.0i 19,0i 8771.6: 1482,7 1057.5~ -1124.1' 35,5 O.O; 35.5 9210,01 72 6~ 19 0, 87'8~'.~7-~'~5-0-6~'8-- -ib-~3-~O~'L-~-~'~ S~i; 35.5"; ..... 0~0 35.5 .............. ; ........ ~----2 ............ %---: ............ ~ ..... t ............... · 9240.0~ 83.3~ 190{ 8789.4 ~ 1519.0 :: 1111.3; -1105.8 35.5 0.0 35.5 .l ........... , ......... , ~255.~ ~0.0' ~¢.0~ S7fl0.5 ~53~_8: ~292:-~O~g5 35.5 0.0 ~5.5 9270.0~ 90.0' 18.5~ 8790.5 'i~39'~0: i139.7 -1095.9 Q 1 -4.1. 4.1 ~ ................. J .......................................................... shaded:- ........ oT,o.s ....... ..... 9330.0 90.1 16.0 9360.0 90.1 14.8 - 390.0 90.1. 3.5 - 8420.0 90.1i 12.3 716180,5'1, Tie In Point 7161'i~'.~ ................................................... 716203,9' 716212 .4 ~ 2. KOP 36 DIs --5944038.5i ..... 716229,9' 4'~'B-~t~ of ~one 3 5944-052,'0; 710234.2, 8~0.'5; .... '~"~-9~ .... i"i 97.O' -1078.2 O. 1 ....... ~7~0.5 i 1600.11 1225.9; -1070.2 0.1 ,~ ...... ~ ............... ? ........... 8790.41 -i 621,4~ 1255,0' -1062.9 O. 1 8790.4! 1~3.2' 1284.21 -10~.2 : i -4.1 -4,1 0.1 -4.1 5944076.0 71'624-I.6'i 5944102.5 716249.8:: 5944130.5 716258.6: 5944148.5i' 716264.2 5. EOB 5944159.0; :/16~6~-14 ........... 5944188.0~ 716275.8: 4.1 ...... 5c~174~-i-'~-0'! ..... 716283,6! ............. .... 4.i" 5944246.0 716290.7! ............. 41~ 5944275.0 716297.1 .............................. 4.1 5944304.5 .... 716303,0 .................................. 0 0 ~,~A._R. 2 7._..~r~,, - '9450.0~ ...... 90,1 ....... 11.0; 8790.3'?~'"'~665.3, 1313.6 -t050.1. 0.1! -4.1 4.1 5944334.0 71~308.3 ........ ~.80'.'0~ 901"1" At~s'~'~J'& ~t1~'~ 00~t-~,8-~ 1343.1' -10~4.'7 .................. ~)'?'i'"'i ........... -41':i ............ 4.:i '" 5944~,4.0 716312.8 .................................... 'ii'.-i"'~"i0.0! ' ~'.0_:12.~'ii_' i'.'""'iii'8..~] 'ASi~_~',~;.,,!~ !3'~'i,iii.'~ii3_39_:_~"-_,~-~ .... ,'-_ji.~:?i-!ii'~ii'_.i],ii~'~::l.,i._i ..... .4..!.... 5.~4'.4-3_~_j_5.-. ..... ~.'-§. ' ..................... 9540,0~ 90.2 7.3:, 8790.1 1734.5: 1402.4 -1035_8 0.1 -4.1 4.1 5944423.5; 716320.0 .............................. '9'5-'~"0'.'d'! ....... 9'0~-;~ ......... 6.1i ' 8~'~).'-~ .......... i-:7'5~3 ......... "¥~':~-;~'i'~ ....... ,,'"J-~32.3 ....... 0.1 .... -41'1 .......... 4~.'i' ......... ~;'~'4-4~5-~'.'5! 7'163~'2-16- .......................... ..................... .................................................... j. ............................................................ -'--~00'i~'i ........ ~.'~ ..... ~-~'! ........ ~789'i'9~ ........... ':~-'~'~';6'; ......... i462'i'~-'j"'""~'-~J~4~ ' 0.1' ' ......... :~i"'i ....... '~.'1i 5944483.0! ..... ~'~'-,~61 ............................................ ....... ..... ......... ........ .... ....... ................. . ~0.0; 90.3j 2.4. 8789.6 1832.2:. 1522.0 -~025.6 0.1j -4,1 4.1 59~3.0 7163~ 7' _._ __..~~90'0~ 90.3~ 1.t' 8789.5 1857.5~ 1552,0 -1024,7 .... 0,1~ -4.1 4.1t 59~573.0 7163~.71 .... -. ' ...... : ......................................................................................................... 90'~3'~ .... '~'9'.-9' ....... 8789-~3"' 1883.2; 1582.0 -1024.5: 0.1~ -4.1 4.1~ 59~3.0 7~3~.:!; ................. ....... {J~'-~'61~ 90.3: 358.6' 8789.2 1909 21 .... -15'i--~',9 -1024.,9 0.1 -4.1 4.1~ 5944633,0 ..... ~:7'8-0.0 ........ {J6:~' .... --3-~-~'~~'~'-~. .... 8':~8910 193515'!'' "1641"191'-'~i0'2~'.-~ ....... '~':1- ............ 9810.0 90.4 356.1j 8788.8, 1962.2: 1671.9 .1027.6' ' 0.':i ............--4'.~'i ....... '2,'i'i-"~ ...... ~44'6{i3.0 9840.0 "90.4 3-5'~i{J'i ......... 8~;'~-81"7'i ' i989'.'ii .......... i"~O"j]~T-~-d~O.O .....~i':'i ............... ~2,]';i"~- .............. ~'i ....... ,~944723.0 ....... 9870.0: g0~-4~: .......... ~-.~'~':'/~ ...... '~'f'l~8 51 20~'6J'3'i :'17311'6 ..... ~:1-0-:~3.-0 ......... 011 ....... -4J:1 9900.0! 90.4i 352.4 8788.3' 2043.8 1'76'i-14-t036.6 0.1 -4.1 4.1 9930.0! 90.4i 351.2 8788.0': ....... ':~-~i.~ ......... ~'7~.-1 ........ ;i'-O~[~T 07i .................. .~,~'i'~''!''' 4.1 9960.0: 90,4~ 349.9 8787,8 2099.5 1820,7: -1045.8' 0 1 -4 1 4.1 9990.0 ..... 90.'5 ......... 3~i-') ......... §'~E1'7.6 212~'i~7': ......... :i'-t~;-d~'~-~'~-~"~ 1.4 j .......... 0'1i ............... '-4-,'i ........ 4,1 "10lj2-0-.'6 ........ ~l,~i-~ ........... 3~47.4 8787.3, 2156.1 .... ~ 8~9.'51-::1'057.6 0.1~ ....._4.:I ...... 4.1 ~ : i005-0~-; ......... ~)~-~)'~ ...... §.~ '-~-')"'i" 2184.7 1908.7~ "!064.4'~:' '0.--{-'- -4.1 .... 4.1 10080.0' 90.5~ , 345.0 ~7~i'i~ ......... ~21-~. ~57 ._'_.:1913~18 .... '1071.9; 0.1: -4.1 4.1 .. '-'_'10~ ~)~0 "9'0~-~] 343.7 8786.6' 2242.5 1966.7:-1080.01 0.1 -4.1 .......... 4.1 10140.0i 90.5' 34215 ' "8786.3: 2271.7~ 1995.4 -1088'.:/ ...... 0.~ ......... L-4-.~ ..... 4.1 716324,9 716322.9 716320.4 71631 '7,2 4.1 ..... ~9-4-4752.~ .......... ~"1"~-~':1--313 ............... 5944782.0 716308 8 ! 5944812.0. 716303,7' 5944841.0 7i"6297.9-- .... i-0170,0 90.6 "34'i12- io2oo.o ........ 96~-67 '340.o!' '10%30.0 90.S-[ ........ 3-3~T~ ........ 10260.0 90.6" 337.~'~' 10290.0 90.6 "10320.0 ' ' _ __ 8786,0 2300.9; 2023.9' -1098.0 0.1 -4.1 8785.7 23-3~.4 '--2052.2! -1108.0 ......... '0'.'~ .......... -4.1 8785.4 2359.9, 2080.3!-1118.6 0.1 -4.1 8785.i ..... 2-3~9.6~ ~"~'~'8~'~!-1129.7:~ 0.0 .... -4.1- 33613 .... 8784.8 2419.3' '2135,7! -1-'i41.5t ....... 5944870.5 716291.5 5944899,5! 716284,4 ............... ...... 5944928.5: 716276.8 5944957.5 716268.5! 594~.~J~i-.-0--- 716259.6 i 5945014.5 716250.0 4.1 5945043.0: 716239.9 90.6 335.0 8784,5 24.49,1i 2163.0:-1153.9 4.1 5945071.0.t. 716229.1 4,1' "5~5-~§'81§~ ..... "~:i-6~17.8! - --4.i .... 594,~-'!-26.0' 716205.8 -- -4,1-'- ...... -4,1-~ 5945153.5 716193.2 0.0'; ............ J4:.i- 4.1 5945180.5 7-16180.1 o '-3 o 3. Tab }ST-O2.XLS 3/25/90 3:50 PM 10350~0: 90.6 333.8 8784,!~ 2479.0' 2190.1,. -1166.9':.. 0,0 -4.1i 4.! 5945207.0 716166.3~ 103~-0~) .... ~)'6".'~ ........... :~-~i',~: ...... 878'38 ..... ~$"0~'~'~'~ ........ ~-6-~'~i'~-'80.4~ ........ 0~ -4~1~ ' 4.1~ 5945233,5 ........ -~"i"'~15'~"~ .................. ~ ........................ ~ ~ '. ~ ........... '1'-~10.0~ 90.7 331.3 8783.4~ 2538.9 2243.3~ -.i194.5 0.0: ~.1~ 4.1~ 5945259.5 716137.1; ........ 1~40,0:' 90.7 3~'~':'-~ ........ ~7-83::~'~ 2568:9'~ 2269.5~'":i"2-09.~ .......... 0~0: ':4:~ 4,i'~ 5~528~:0' .......... ...... ........... ...... ..... .... o:o:' ; .................. r ..... -- ............. ; ........... : .... ~ ...........?~s~5:'7' .... ....... ' ..... - .... ~17 .... ~'-osoo:o~ oo.~' ,~7':'~' ~¢ ........... ~s'.~"232o'0'['~':~'~:37' 'o': 0('--- -~:'~ ~.'~'t ..... ~'~ss~:'~-f 2345.g~ -1258.8; 0,0t -4.1~ ...........10590.0:; 00.7} .................. 323,9~ 8781.2 27'18,7 ........................... 2395,1 -1291,01 0,0 -4.1[: ................. 4,1i[ .................. 5~5408.5'.' 716036.4~ ..... ' ! ......... ~ .............. : .......... ~ ...... ~-I ; ........................ ; 1~20.0~ 90.8 322,6~ 8780.9 2748,5 2419.1 -1308.9~ 0.0: -4.1 4.t ' 5945432.0~ 716017,7 ..................... ~ ....... ......... ......-, ~ ~ .............. . ~ ......................... ~ ................. ~ ~ .......... ,, lO~5O.O 90.0~ 3~.~; 87s0.5i 2778.2: }a42.8'~"-:i'~.'4 ~Y6} ............ :4'}i";' 4,1 5045455.0'~ 7~5000.6~. 1~80 O: gO 8~ 320 1: 8780.1L 2807.9~ 24~.0~ -1346'~ 0~0 ~,1; 4.1: 5945477.5': 7t5978,9 ! ' . : ............ ' -...L .......................................... l ,, " ~ ~ ...................... ~ .................... ~ ................................. 10710.0: gO,8~ 318.9: 87796~ 2837.5~ 2408.8~ -1365.9; 0.,0 4.~ ~ 4..1~ 5045500.0~ 715958.8' ................................................. ~ ................ ~ ..................... ~ ~ .........~ r ......... ~ ..........................~ ........ · ..................... ~07aO.O ~O.S~ 31~.~: a7792 20~.~: 25~.2 -'1305:8~ ............ 0,.0~ ..... :~.:.!.~2 .... D:J.~ .... SO~S52~.S 7~s~a82' --' 107~'0~b ............ 90~8': ..... 3'j6~'4 877'8'8-? 28~.2' 2533.1' -1406.3' 0.0[ -4.!~ 4.1' 5945'M3~3-'-~"~'917,1 .................................. ...................... ' ~ ............. : .......... T ................. ~ ....................... ~ .......................... 10800.0 90.8 315.2 ' 1-~3'830.0 90,8; 31319:' ......B-~-7~,'~ ......... -~_~.3' 2575.7 -1448.6 .................. ~ ................................................. .; 10860.0: 90.8 312.7: 8777,5 2983.2~ 2596,2 -1470,4~: -~1'0890.01. 90,8 311,4i 87'7~7~i --~3~'~"i-~':- ...... ~':i'-6~-~i' -1492.7 .......... ~ .................... ~ ........ ~ ..... , 10920.01 90.8 310.2! 8776.7' 3040.2: 2635.91 -1515.4 10950.0! 90.9 30819 8776.2:, 3068.5! 2655.0i -1538.5 10980.0~ 90,9i 307,7: 8775.8' 3096.4 .... 267-~.6 -'11(~(~'i'~-'i ......... ~'9:~ ..... 30B-1-5 ..... 8'7~'5.3 3124.2 2691 .~" -1586.0 1~-0-;~5,8 ...... 9019i ...... ;~05,8 8775,1 ...... 3138,7' 2-~/~'~-i0; '-'-~ i598.7 87'7'8~-- .... '~;c~-~.~ ........ :2-55'4.6 -1427.2 0,0. -4.1':: ....... ~'~-;!- ..... 594.5564,0 715895,6 i _4'.-:i ........... ',4.1 i--: ' 5945584.5 715873'i'~ ............................................ -4.1, 41i?--~54~-04.0" '-"?;i-5'~'~i ,2 ................... -4.1 '~ 4.1i 5945623.5 i 7t582813'i ..... i ............ i .... -4.1~ 4,11 5945642.5! 715805.11 .............. ¢ ............. O.Oi 0.0 -4.1! '41':~ ........... ~?t'"' 5945661.0 -7"i57811~,-:, ................................... -J,',i ..... 4.1: ....... ~)945679,0 71'-57~'.'3 ....... i---t ~] -4.1i 4_1i 5945696.5~_ 715732.91 ' 4.1i 5945705.5'! ....715719.9i6. TO ' - ST-~2r : Sidetrack Case n~, 2 y 9..~,tCTRU · Odglnat ~J-31G '~ellbore 6 ..... ARCO ALASKA tNC. 8400 ...... 865O ,. ... 8900 -- .. 2.i KOP Original 9-31C Wellbore Vertical Section ~c~le I inch 250 ft Plane of Vertical Section 329.36a Referenced to True North ..... 2500 .... 2000 Scale I Inch: ~00 ft c.~a ~coetk~-31 c'~-$'t ce ~. Merch '2~, 199~ Draw By: gimo HaClputro IIII I II Mud 60/40 I Trplx I Shop Fuel Water Pump Room Pipe rack Boilers  r" r.j) Preferred Major Equipment Layout for CT Drilling in DS 9-31C Dowell Drilling Equipment Trailer C T Drilling Wellhead Detail ~ CT Injector Head Stuffing Box (Pack-Off), 10,0OO psi WorkJng Pressure Methanol Injection Offs 7' WLA Quick l C~nect -'-'--.- Alignment Guide Flan~ Ram Type ~ Gate BOPE Manual over HTdrauPc ~ 7-1/16" ID wr~h Pipe/Slip Rar~ Flanged Fire Resistant Kelly Hose To Dual ChokeManrlo~l ~ Manual Master Valve o.458' ($.53 Cutters or Combinath3n Cutter/Blinds '--~:= Slip / Pipe rams -~ Annutar BOP (Hydril),7-1/16' ID 5,000 psi worldng pressure Valves Drilling spool 7-1/16', 5M by 5-1/8', 10M Hanger ~Fire Resistant Kelly Hose to Flange by Hammer Up 1/4 Turn Valve on DS Ha~dline 10' from Tree 9-5/8' Annulus 1 ~ A~nulus WELL PERMIT CHECKLIST POOL GEOL AREA ADMINISTRATION 1. Permit fee attached ..... N 2. Lease number appropriate., i ! ! ! ! i i ! ! ! i i ! N 3. Unique well name and number. N 4. Well located in a defined pool ............ N 5. Well located proper distance from drlg unit boundary. N 6. Well located proper distance from other wells ..... N 7. Sufficient acreage available in drilling unit ..... N 8. If deviated, is wellbore plat included ........ N 9. Operator only affected par~y ............. N 10. Operator has appropriate bond in force ........ N 11. Permit can be issued without conservation order .... N without 12. Permit can be issued administrative approval. N 13. Can permit be approved before 15-day wait ....... N ENGINEERING REMARKS 14. Conductor string provided ....... · ......... 15. Surface casing protects all known USDWs ......... 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... Adequate tankage or reserve pit ............ 20. 21. If a re-drill, has a 10-403 for abndnmnt been approved. ~.~l~? 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate ..................... 26. BOPE press rating adequate; test to ~.~ psig. ~ 27. Choke manifold complies w/API RP-53 (May 84) ...... 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............ GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y N~ 31. Data presented on potential overpressure zones ..... Y 32. Seismic analysis of shallow gas zones .......... 33. Seabed condition survey (if off-shore) ........ 34. Contact name/phone for weekly progress reports . . . ~/. Y N [exploratory only] GEOLO~.Y: ENGINEERING: BEW JDH '¢ljb - A:~FORMS~cheklist rev 11195 COMMISSION: DWJ JDN ~ Comments/Instructions: wellbore se9 [] STATE OF ALASKA ' ALASKA ..~,'L AND GAS CONSERVATION GO~,.-,vllSSION APPLICATION SUNDRY APPROVALS 1. Type of Request: 2. Name of Operator ARCO Alaska, Inc. Abandon X Suspend Operation shutdown Alter casing Repair well Plugging X Change approved program Pull tubing Vadance 5. Type of Well Development Exploratory Stratigraphic Service 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1587' NSL, 998' WEL, Sec. 2, T10N, R15E, UM. At top of productive interval 2526' NSL, 2187' WEL, Sec. 2, T10N, R15E, UM. At effective depth Re-enter suspended well Time extension Stimulate Perforate Other OO3 At total depth 2224' SNL, 1843' WEL, Sec. 2, T10N, R15E, UM. 6. Datum of elevation(DF or KB) 50' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-31B 9. Permit number 94-83 10. APl number 50 - 029-21396-02 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary ~ ~-~T~_ ~-'~]~~ Total depth' measured 9763 feet Plugs(measure) _ 9405' MD (10/25/94) true vertical 9048 feet Effective depth: measured 9405 feet MA~ 2 0 ]9~ true vertical 8996 feet Junk(measured) Alaska 0il &Qas Cons. Commission Casing Length Size Cemented Anchorage Measured depth True vedical depth Conductor 111' 20" 1800¢ Polyurethane 111' 111' Sudace 2483' 13-3/8" 2500 Sx CS Iil & 400 Sx CS II 2533' 2533' Production 8355' 9-5/8" 500 Sx G & 300 Sx CS I 8405' 8136' Liner 1182' 7" 264 cu ft G 9394' 8988' Perforation depth: measured 8989 - 9007'; 9038 - 9048'; 9055 - 9065'; 9252 - 9254'; 9273 - 9275'; 9287 - 9289'; 9322 - 9340'; Open Hole: 9405 - 9820' true vertical 8679 - 8694'; 8720 - 8728'; 8734 - 8742'; 8889 - 8890'; 8904 - 8905'; 8908 - 8910'; 8934 - 8948'; Open Hole: 8996 - 9048' Tubing (size, grade, and measured depth) 5-1/2", NSCC Tbg @ 37' MD; 4-1/2", 12.6#, 13CR, NSCT Tbg @ 37'-8843' MD; 4-1/2", 12.6#, 13CR, NSCT Tbg @ 9270-9289' MD Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 8774' MD; Baker Packer @ 9270' MD; Camco TRCF-4A SSSV @ 2096' MD. 13. Attachments Description summary of proposal . x Detailed operations program BOP sketch x 14. Estimated date for commencing operation March 31, 1996 16. If proposal was verbally approved Oil X Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed '~_~ '~. ~ Title 15. Status of well classification as: Gas Suspended Engineering Supervisor Date FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~/" BOP Test ~ Location clearance __ Mechanical Integrity Test .__ Subsequent form required 10- Original Signed By 0avid W. Johnston Approved by order of the Commissioner ~.uproved Copy Commissioner I Approval No. ~,~, .-- ~' ~' Form 10-403 Rev 06/15/88 Date SUBMIT IN TRIPLICAT~'-~ Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ****************************** . ............................ * ....... SCHLUMBERGER ....... . ............................ ****************************** COMPANY NAM~ : ARCO ALASKA, INC. WELL NAM~ : D.S. 9-31C FIELD NAIVE : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292139603 REFERENCE NO : 98035 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/01/23 ORIGIN : FLIC REEL NAME : 98035 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA INC, D.S. 9-31C, PRUDHOE BAY, 50-029-21396-03 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/01/23 ORIGIN : FLIC TAPE NAME : 98035 CONTINUATION # : 1 PREVIOUS TAPE : COM~ENT : ARCO ALASKA INC, D.S. 9-31C, PRUDHOE BAY, 50-029-21396-03 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D.S. 9-31C API NUMBER: 500292139603 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 23-JAN-98 JOB NUMBER: 98035 LOGGING ENGINEER: BAILEY OPERATOR WITNESS: J. JULIAN SURFACE LOCATION SECTION: 2 TOWNSHIP: iON RANGE: 15E FNL: FSL: 1567 FEL: 998 FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: 55. O0 DERRICK FLOOR: 54. O0 GROUND LEVEL: 22. O0 WELL CASING .RECORD 1ST STRING 2ND STRING 3RDSTRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.675 8400.0 47.00 7.000 9405.0 29.00 2.875 10945.0 6.50 4.500 9289.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURzF2D DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 26-AUG-96 LOGGING COMPANY: SPERRY SUN BASELINE DEPTH 88888 0 9753 0 9725 5 9719 0 9718 5 9709 0 9698 0 9697 5 9679.5 9666.0 9660.5 9658.0 9657.0 9651.5 9643.5 9638.0 9619.5 9618.0 9612.0 9603.0 9595.0 9575.0 9572.0 9571.0 9559.0 9550.0 9546.0 9540.5 9532.5 9524.0 9520.0 9514.0 9511.0 9509.5 9501.0 9490.0 9485.0 9479.0 9464.5 9462.0 9459.5 9452.0 9424.5 9414.0 9409.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH 88889.0 9726.5 9718.5 9709.0 9697.0 9678.0 9664.5 9660.0 9658.5 9645.5 9638.0 9620.5 9617.5 9610.5 9603.0 9593.5 9575.5 9574.5 9572.0 9559.0 9549.0 9543.5 9537.5 9529.5 9523.0 9515.5 9508.0 9506.0 9503.5 9501.0 9492.0 9486.0 9478.0 9463.0 9460.5 9459.5 9451.5 9424.5 9413.5 9409.5 TDTP 88889.0 9754.0 9726.0 9718.5 9708.5 9697.0 9678.0 9665.0 9660.0 9658.5 9652.5 9645.5 9638.0 9620.5 9617.5 961 O. 5 9603.0 9593.5 9575.5 9574.5 9572.0 9559.0 9549.0 9543.5 9537.5 9529.5 9523.0 9515.5 9508.0 9506.0 9503.5 9501.0 9492.0 9486.0 9478.0 9463.0 9460.5 9459.5 9451.5 9424.5 9413.5 9409.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 9403.5 9391.0 9388.5 9383.0 9376.5 9373.0 93 67.0 9359.5 9355.0 9339.5 9334.0 9328.5 9318.5 931 O. 5 9304.5 9271.5 9267.0 9262 0 9257 5 9255 0 9249 0 9235 0 9228 5 9223 5 9219 0 9218 5 9214 5 9207 5 9201 0 9192.5 9181.5 9179.0 9175.0 9170.0 9162.5 9159.5 9159.0 9152.0 9149.5 9147.0 9141.0 9139.0 9130.5 9118.5 9115.0 9109.5 9106.5 9096.0 9092.0 9084.5 9080.0 9074.5 9074.0 9072.0 9070.5 9067.5 9403 9386.5 9382.5 9371.0 9366.0 9360.0 9354.5 9341.5 9336.0 9327 0 9321 0 9312 0 9303 5 9272 0 9265 0 9261 0 9257 0 9253 0 9246.5 9233.5 9227.5 9222.0 · 0 9403.0 9390 5 9386 5 9382 5 9376 0 9371 0 9366 0 93 60 0 9354 5 9341 5 9336 0 9327 0 9321 0 9312 0 9303 5 9272 0 9265 0 9261 0 9257 0 9253.0 9246.5 9233.5 9227.5 9222.0 9217.5 9217.5 9213.5 9207.5 9200.5 9191.5 9181.5 9179.0 9175.0 9170.5 9162.0 9159.0 9151.5 9148.0 9145.5 9140.0 9137.5 9128.5 9116.0 9112.0 9108.5 9104.5 9095.0 9090.5 9083.5 9074.0 9071.0 9070.0 9067.0 9213.5 9207.5 9200.5 9191.5 9181.5 9179.0 9175.0 9170.5 9162.0 9159.0 9151.5 9148.0 9145.5 9140.0 9137.5 9128.5 9116.0 9112.0 9108.5 9104.5 9095.5 9090.5 9083.5 9080.5 9074.0 9071.0 9070.0 9067.0 23-JAN-1998 09:32 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 9065.0 9064.0 9064.0 9063.0 9062.5 9062.5 9060.0 9058.5 9059.5 9059.0 9057.0 9057.0 9057.0 9046.5 9047.0 9047.0 9044.5 9044.0 9044.0 9041.0 9040.5 9040.5 9040.5 9038.5 9039.0 9039.0 9036.5 9036.5 9037.0 9032.0 9031.5 9031.5 100.0 99.5 99.5 $ RE~LgKS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE TDTP DATA AQUIRED ON ARCO ALSKA'S DS 9-31C WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE BCS GAF~4A RAY, ALSO SIGMA PASS #1 AND THE BCS GAM~A RAY, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMF!ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9737.0 8973.5 TDTP 9761.0 8973.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUM~ER: .......... EQUIVALENT UNSHIFTEDDEPTH .......... LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: BASELINE DEPTH GRCH TDTP $ REFIARJfS: THIS FILE CONTAINS CASED HOLE TDTP PASS #1. THERE ARE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM TDTP CU 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 SBHF TDTP CU 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 SBHNTDTP CU 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 SIGC TDTP CU 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 SIBH TDTP CU 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 TRAT TDTP 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 LCO1 TDTP 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 SDSI TDTP CU 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 BACK TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 '~ .... PAGE: 6 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUFiB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUF~ SAMP ELEM CODE (HEX) TCAF TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 TCND TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 TCFD TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 TSCN TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 TSCF TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 INFD TDTP CPS 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH TDTP GAPI 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 TENS TDTP LB 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 CCL TDTP V 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 GR BCS GAPI 1066326 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 9770.000 SIGM. TDTP -999.250 TPHI.TDTP -999.250 SBHF. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP LCO1.TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP GRCH. TDTP -999.250 TENS. TDTP -999.250 CCL.TDTP -999.250 GR.BCS DEPT. 8973.500 SIGM. TDTP 13.216 TPHI.TDTP 18.908 SBHF. TDTP SBHN. TDTP 51.761 SIGC. TDTP 0.811 SIBH. TDTP 99.724 TRAT. TDTP LCO1.TDTP 2.124 SDSI.TDTP 0.254 BACK. TDTP 145.488 FBAC. TDTP TCAN. TDTP 32120.535 TCAF. TDTP 15125.639 TCND. TDTP 17786.043 TCFD. TDTP TSCN. TDTP 6116.293 TSCF. TDTP 2880.177 INND. TDTP 2065.141 INFD. TDTP GRCH. TDTP 11.625 TENS. TDTP 1475.000 CCL.TDTP 0.000 GR.BCS -999.250 -999.250 -999.250 -999.250 -999.250 35.200 40.101 1. 664 29. 428 6272. 728 286. 302 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUF~4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9232.0 8974.0 TDTP 9252.5 8973.0 $ CURVE SHIFT DATA - PASS TO PASS (FIEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUFIBER : 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP 88888.0 88887.0 88883.5 9240.0 9235.5 9228.5 9227.5 9227.5 9224.0 9223.5 9218.0 9217.0 9212.5 9206.0 9203.5 9202.0 9198.0 9197.0 9194.5 9194.5 9191.5 9190.5 9186.0 9183.5 9182.0 9178.5 9181 . 5 9179.0 9176.5 9175.0 9172.5 9170.0 9172.0 9172.0 9168.0 9168.5 9161.0 9159.0 9160.5 9159.0 9158.5 9155.5 9156.5 9154.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 9156.0 9153.0 9151.0 9147.0 9142.0 9141.5 9139.5 9135.5 9132.0 9130.0 9128.5 9118.0 9115.5 9113.0 9111.5 9106.0 9099.0 9097.0 9092.5 9089.0 9085.0 9084.5 9081.5 9080.0 9074.5 9073.5 9072.5 9063.5 9063.0 9059.5 9057.5 9057.0 9051.0 9047.0 9046.5 9043 5 9040 5 9038 5 9036 5 9036 0 9034 0 9032 0 9025 0 9022 0 9021 0 9018 0 9017 5 9009 0 9006.5 9005.0 9OO3.0 9001.5 8999.5 8997.0 8993.5 9151.5 9140.0 9132.5 9128.0 9126.0 9116.0 9112.5 9108.5 9096.0 9090.5 9083.5 9079.5 9074.0 9071.0 9062.0 9057.0 9051.5 9047.0 9040.5 9039.0 9036.5 9031.5 9025.0 9019.5 9017.5 9006.0 9004.0 9001.0 9155.0 9150.5 9145.5 9141.5 9137.5 9131.5 9111.5 9103.5 9096.0 9087.5 9083.0 9080.0 9073.0 9062.0 9058.0 9057.0 9047.0 9042.5 9039.0 9036.0 9033.5 9021.0 9017.5 9007.5 9004.0 8999.0 8996.5 8992.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 8992.0 8990.5 8990.5 8989.0 8986.0 8985.5 8985.0 8979.5 8978.5 8978.5 8978.5 8977.0 8976.0 100.0 100.0 99.0 REMARKS: THIS FILE CONTAINS CASED HOLE TDTP PASS #2. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND THE GRCH PASS #1, ALSO SIGMA PASS #2 AND SIGMA PASS #1, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 2 3 4 66 5 66 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 92 1 0.5 FT 11 0 FT 68 1 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFfl~ SAMP ELEM CODE (HEX) DEPT FT 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 SIGM TDTP CU 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 SBHF TDTP CU 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 SBHNTDTP CU 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 10 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CI.~SS MOD NUlvlB SA31P ELt~I CODE (HEX) SIGC TDTP CU 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH TDTP CU 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT TDTP 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 LCO1 TDTP 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 SDSI TDTP CU 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TSCF TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 INND TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 1066326 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9252.500 SIGM. TDTP 13.731 TPHI. TDTP 25.731 SBHF. TDTP 29.332 SBHN. TDTP 40.723 SIGC. TDTP 1.286 SIBH. TDTP 67.277 TRAT. TDTP 1.932 LCO1.TDTP 2.413 SDSI. TDTP 0.215 BACK. TDTP 273.698 FBAC. TDTP 65.061 TCAN. TDTP 62805.930 TCAF. TDTP 26027.484 TCND. TDTP 27421.387 TCFD.TDTP 9551.719 TSCN. TDTP 12009.840 TSCF. TDTP 4977.014 INND. TDTP 2063.900 INFD. TDTP 319.285 GRCH. TDTP -999.250 TENS. TDTP 905.000 CCL. TDTP 0.000 DEPT. 8973.000 SIGM. TDTP 12.894 TPHI. TDTP SBHN. TDTP 56.786 SIGC. TDTP 0.869 SIBH. TDTP LCO1.TDTP 2.154 SDSI.TDTP 0.216 BACK. TDTP TCAN. TDTP 33862.656 TCAF. TDTP 15718.943 TCND. TDTP TSCN. TDTP 6407.481 TSCF. TDTP 2974.333 INND. TDTP GRCH. TDTP -999.250 TENS.TDTP 970.000 CCL. TDTP 19 971 120 335 199 794 18672 547 2097 600 0 000 SBHF. TDTP TRAT. TDTP FBAC. TDTP TCFD. TDTP INFD. TDTP 40.163 1.708 36.986 6452.126 277.497 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 11 **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, TDTP $ REMARKS: THIS FILE CONTAINS THE ARITH~I~TIC AVERAGE OF PASSES 1 & 2. THE DATA WAS CLIPPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 84 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-i998 09:32 PAGE: 12 TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ ArUF~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFIB SAMP ELEM CODE (HEX) DEPT FT 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 SIGM PNAV CU 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 TPHI PNAV PU-S 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 SBHF PNAV CU 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 SBHNPNAV CU 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC PNAV CU 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH PNAV CU 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 TRAT PNAV 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI PNAV CU 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 TCANPNAV CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF PNAV CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 TCND PNAV CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD PNAV CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 TSCN PNAV CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 TSCF PNAV CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 INND PNAV CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 INFD PNAV CPS 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 LCO1 PNAV 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 1066326 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9761.000 SIGM. PNAV -999.250 TPHI.PNAV -999.250 SBHF. PNAV SBHN. PNAV -999.250 SIGC. PNAV -999.250 SIBH. PNAV -999.250 TRAT. PNAV SDSI.PNAV -999.250 BACK. TDTP 33.833 FBAC. TDTP 9.639 TCAN. PNAV TCAF. PNAV -999.250 TCND. PNAV -999.250 TCFD.PNAV -999.250 TSCN. PNAV TSCF. PNAV -999.250 INND. PNAV -999.250 INFD.PNAV -999.250 LCO1.PNAV GRCH. TDTP -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 DEPT. 8973.500 SIGM. PNAV 13.351 TPHI.PNAV 19.274 SBHF. PNAV 40. 463 SBHN. PNAV 54.779 SIGC. PNAV 0.827 SIBH. PNAV 112.050 TRAT. PNAV 1.664 SDSI.PNAV 0.244 BACK. TDTP 145.488 FBAC. TDTP 29.428 TCAN. PNAV 33014.359 TCAF. PNAV 15629.002 TCND.PNAV 18228.375 TCFD.PNAV 6423.823 TSCN. PNAV 6268.792 TSCF. PNAV 2967.605 INND.PNAV 2054.468 INFD.PNAV 284.536 LCO1.PNAV 2.113 GRCH. TDTP 11. 625 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 13 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SUFm~ARY VENDOR TOOL CODE START DEPTH TDTP 9773.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMPL~ RAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): STOP DEPTH 8737.5 04 -0CT-97 CP 44.2 1037 04-0CT-97 10945.0 8750.0 9750.0 1800.0 TOOL NUMBER ........... CGRS-A-970 TDIC-A LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 14 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 10945.0 PRODUCED WATER 28.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED IN TO SPERRY NGP/ROP DATED 8-JUL-94. THE PURPOSE OF THIS LOG WAS TO IDENTIFY THE GOC AND OBTAIN BASELINE TDT POROSITY AND SIGMA. PASS #1 WAS MADE WHILE INJECTING AT 10,000 BWPD. PASS #2 WAS MADE WITH THE INJECTION SHUT DOWN. PASS #3 WAS NOT OBTAINED DUE TO TELEMETRY ERRORS. NO ATTEMPT WAS MADE TO OBTAIN A SECOND PASS AFTER THE TEL~4ETRY PROBLEI~S. THE GOC DOES NOT APPEAR IN LOGGED INTERVAL. A GAS UNDERRUN IS FROM 9095' TO 9110'. THIS FILE CONTAINS RAW PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 15 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUFiB NUFIB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP EL~I CODE (HEX) DEPT FT 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 SIGM PS1 CU 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI PS1 PU 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 SBHF PS1 CU 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 SBHNPS1 CU 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 SIGC PS1 CU 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 SIBH PS1 CU 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT PS1 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 LCO1 PS1 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 SDSI PS1 CU 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 BACK PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 FBAC PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 TCAN PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 TCAF PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 TCND PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 TCFD PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 TSCN PS1 CPS 1066326 O0 000 O0 0 4 1 1 .4 68 0000000000 TSCF PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 INND PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 INFD PS1 CPS 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 TENS PS1 LB 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 GR PS1 GAPI 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 CCL PS1 V 1066326 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09~32 PAGE: 16 ** DATA ** DEPT. 9770.000 SIGM. PS1 SBHN. PS1 92.045 SIGC. PS1 LCO1.PS1 0.000 SDSI.PS1 TCAN. PS1 0.000 TCAF. PS1 TSCN. PS1 0.000 TSCF. PS1 TENS. PSI 1390.000 GR.PS1 DEPT. 8960.000 SIGM. PS1 SBHN. PS1 61.291 SIGC. PS1 LCO1.PS1 4.635 SDSI.PS1 TCAN. PS1 15918.428 TCAF. PS1 TSCN. PS1 740.097 TSCF. PS1 TENS. PSi 1430.000 GR.PS1 22.725 TPHI.PS1 0.000 SIBH. PS1 15.924 BACK. PSI 0.000 TCND.PS1 0.000 INND. PS1 15.070 CCL.PS1 46.589 TPHI. PS1 0.203 SIBH. PS1 1.006 BACK. PSi 3269.854 TCND.PS1 159.689 INND.PS1 45.156 CCL.PS1 0.000 SBHF. PS1 141.963 TRAT. PS1 28.172 FBAC. PS1 -366.776 TCFD.PS1 -0.958 INFD.PS1 0.000 88.033 SBHF. PS1 176.232 TRAT. PS1 148.741 FBAC. PS1 8519.662 TCFD.PS1 1941.533 INFD. PS1 0.000 95.820 0.000 7.252 -79.861 -0.247 48.394 1.986 30. 005 1625.237 240.187 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP 9325.5 8911 . 0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center ~3-JAN-1998 09:32 PAGE: 17 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 04-0CT-97 CP 44.2 1037 04-0CT-97 10945.0 8750.0 9750.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAM~/~A RAY TDTP THERMAL DECAY $ TOOL NUMBER ........... CGRS-A-970 TDIC-A BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 10945.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED WATER 28.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED IN TO SPERRY NGP/ROP DATED 8-JUL-94. THE PURPOSE OF THIS LOG WAS TO IDENTIFY THE GOC LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 18 AND OBTAIN BASELINE TDT POROSITY AND SIGMA. PASS #1 WAS MADE WHILE INJECTING AT 10, 000 BWPD. PASS #2 WAS MADE WITH THE INJECTION SHUT DOWN. PASS #3 WAS NOT OBTAINED DUE TO TELE~fETRY ERRORS. NO ATTEMPT WAS MADE TO OBTAIN A SECOND PASS AFTER THE TELEFiETRY PROBLEMS. THE GOC DOES NOT APPEAR IN LOGGED INTERVAL. A GAS UNDERRUN IS FROM 9095' TO 9110'. THIS FILE CONTAINS RAW PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFIB SAMP ELEM CODE (HEX) DEPT FT 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 SIGM PS2 CU 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 TPHI PS2 PU 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 SBHF PS2 CU 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 SBHNPS2 CU 1066326 O0 000 O0 0 5 1 i 4 68 0000000000 SIGC PS2 CU 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 SIBH PS2 CU 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT PS2 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 LCO1 PS2 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 SDSI PS2 CU 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 BACK PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 19 NAME SERV UNIT SERVICE API API API API FILE NUMB NUFiB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) FBAC PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 TCANPS2 CPS 1066326 O0 000 O0 0 5 1 1 4 TCAF PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 TCND PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 TCFD PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 TSCN PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 TSCF PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 INND PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 INFD PS2 CPS 1066326 O0 000 O0 0 5 1 1 4 TENS PS2 LB 1066326 O0 000 O0 0 5 1 1 4 GR PS2 GAPI 1066326 O0 000 O0 0 5 1 1 4 CCL PS2 V 1066326 O0 000 O0 0 5 1 1 4 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 ** DATA ** DEPT. 9316.500 SIGM. PS2 14.179 TPHI.PS2 27.872 SBHF. PS2 SBHN. PS2 41.705 SIGC. PS2 1.129 SIBH. PS2 73.761 TRAT. PS2 LCO1.PS2 2.517 SDSI.PS2 0.203 BACK. PS2 295.689 FBAC. PS2 TCAN. PS2 60149.445 TCAF. PS2 23900.742 TCND. PS2 27491.625 TCFD.PS2 TSCN. PS2 12029.789 TSCF. PS2 4780.108 INND.PS2 2005.743 INFD.PS2 TENS.PS2 715.000 GR.PS2 119.438 CCL.PS2 -0.031 28.480 1. 997 123. 855 9297. 998 328. 063 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/01/23 ORIGIN : FLIC TAPE NAME : 98035 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC, D.S. 9-31C, PRUDHOE BAY, 50-029-21396-03 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-JAN-1998 09:32 PAGE: 20 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/01/23 ORIGIN : FLIC REEL NAME : 98035 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA INC, D.S. 9-31C, PRUDHOE BAY, 50-029-21396-03 Tape Subfile 2 is type: TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS OPERATOR: , '~ LOGSING COMPel.,. TAPE CREATION~ bATE :%%%~~ JOB DATA ~D R~ 1 JOB ~BER: AK ~ 60043 LOGGING ENGINEER: WORTHINGTON OPE~TOR WITNESS: MOONEY D.S. 9-31C 500292139603 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 26-AUG-96 MWD RUN 4 B. JAHN MOONEY/REEM MWD RUN 6 B. JAHN MOONEY JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 7 B. JAHN VENHAUS MWD RUN 9 B. JAHN HUPP/VENHAUS MWD RUN 10 B. JAHN HUPP/VENHAUS MWD RUN 11 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE:. FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: B. JAHN HUPP/VENHAUS MWD RUN 13 B. JAHN MOONEY/BASS 2 i0N 15E 1587 998 55.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.375 2533.0 9.625 8405.0 7.000 9394.0 3.750 2.875 10945.0 MWD - GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. THIS WELL, D.S. 9-31C, IS RERESENTED BY RUNS 1, 4, 6, 7, 9, 10, 11, & 13. ALL RUNS WERE DIRECTIONAL WITH NATURAL GAMMA PROBE, SCINTILLATION DETECTOR, GAMMA RAY (NGP/SGRD). THIS WELL WAS KICKED-OFF THROUGH A WINDOW CUT IN THE 7" CASING FROM 9058 TO 9063'. THIS WELL WAS DRILLED TO TD AT 10945'. NO DEPTH SHIFTS WERE APPLIED AS~THIS LOG IS THE DEPTH REFERENCe. FOR THIS WELL (PER DICK O'~<_/.~S, ARCO). FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE S~Y PBU TOOL CODE START DEPTH GR 9030.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ REMARKS: STOP DEPTH 10923.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 9026.0 9058.0 4 9058.0 9065.0 6 9065.0 9295.0 7 9295.0 9510.0 9 9510.0 9616.0 10 9616.0 10003.0 11 10003.0 10308.0 13 10308.0 10945.0 MERGED MAIN PASS. ONLY THE ROP CURVE WAS USED FROM RUN 4. NO GR DATA IS PRESENTED FROM RUN 4. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 9-31C : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TY~ ~ 0) 1014 BYTES * Total Data Records: 46 Tape File Start Depth = 10945.000000 Tape File End Depth = 9030.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 11494 datums Tape Subfile: 2 148 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9030.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9072.0 12-APR-96 1.32 2.041 MEMORY 9058.0 9026.0 9058.0 0 28.4 33.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP 290 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.800 9063.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SEAWATER/BIOZAN .00 .0 .0 0 .0 .000 .0 .000 141.6 .000 .0 .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00. .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 1. CN WN FN COUN STAT ARCO ALASKA, INC. D.S. 9-31C PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length TIP TIP Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9100.000000 Tape File End Depth = 9030.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 3 Minimum record length: Maximum record length: 424 datums 65 records... 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUMANGLE: STOP DEPTH 17-APR-96 1.32 2.041 MEMORY 9065.0 9058.0 9065.0 0 32.6 33.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP 290 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 3.800 9063.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO - PRO 8.90 .0 8.9 39000 5.8 .000 .000 .000 .000 .0 145.9 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 4. ONLY THE ROP CURVE WAS RECORDED. $ CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 9-31C : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 1 Curves: Name Tool Code Samples Units 1 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 810 01 1 * DATA RECORD (TYPE# 0) Total Data Records: 254 BYTES * Tape File Start Depth = 9070.000000 Tape File End Depth = 9055.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 11557 datums Tape Subfile: 4 63 records... Minimum record length: 62 bytes Maximum record length: 254 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9045.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9273.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 18-APR-96 1.32 2.041 MEMORY 9295.0 9065.0 9295.0 0 34.7 83.2 TOOL NUMBER NGP 272 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 3.750 9063.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD vISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 8.70 .0 9.2 43000 7.4 .000 .000 .000 .000 .0 145.9 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 6. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 9-31C : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9300.000000 Tape File End Depth = 9040.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1988 datums Tape Subfile: 5 70 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9268.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9487.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 19-APR-96 1.32 2.041 MEMORY 9510.0 9295.0 9510.0 0 86.4 87.4 TOOL NUMBER NGP 272 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 9063.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPEP~ATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.80 .0 9.0 40000 6.8 .000 .000 .000 .000 .0 145.9 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 7. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 9-31C : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9515.000000 Tape File End Depth = 9260.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13091 datums Tape Subfile: 6 70 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9487.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9593.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 19-APR-96 1.32 2.041 MEMORY 9616.0 9510.0 9616.0 0 87.4 89.6 TOOL NUMBER NGP 243 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 3.750. 9063.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.80 .0 9.0 40000 6.8 .000 .000 .000 .000 .0 145.9 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 9. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 9-31C : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9620.000000 Tape File End Depth = 9480.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 2832 datums Tape Subfile: 7 67 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9590.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9983.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 21-APR-96 1.32 2.041 MEMORY 10003.0 9616.0 10003.0 0 88.5 95.9 TOOL NUMBER NGP 297 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 3.750 9063.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.80 .0 9.1 42000 6.4 .000 .000 .000 .000 .0 150.1 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 10. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 9-31C : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 10005.000000 Tape File End Depth = 9585.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15615 datums Tape Subfile: 8 74 records... Minimum record length: Maximum record length: 18 bytes 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9977.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10286.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 25-APR-96 1.32 2.041 MEMORY 10308.0 10003.0 10308.0 0 89.0 92.6 TOOL NUMBER NGP 297 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 3.750 9063.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.80 .0 8.9 43000 .0 .000 .000 .000 .000 .0 154.4 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 11. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 9-31C : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 8 Tape File Start Depth = 10310.000000 Tape File End Depth = 9975.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4846 datums Tape Subfile: 9 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10277.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10923.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 27-APR-96 1.32 2.041 MEMORY 10945.0 10308.0 10945.0 0 90.8 92.8 TOOL NUMBER NGP 243 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 3.750 9063.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) :- MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 8.80 .0 9.0 40000 .0 .000 .000 .000 .000 .0 154.4 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: NEWD RUN 13. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 9-31C : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 17 Tape File Start Depth = 10945.000000 Tape File End Depth = 10250.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19789 datums Tape Subfile: 10 80 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 11 is type: LIS 96/ 8/26 01 **** REEL TRAILER **** 96/ 8/26 01 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 26 AUG 96 9:48a Elapsed execution time = 2.03 seconds. SYSTEM RETURN CODE = 0