Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout193-151Originated: Delivered to:12-Sep-24 Alaska Oil & Gas Conservation Commiss 12Sep24-NR ATTN: MeredithGuhl 333 W. 7th Ave., Suite 100 600 E 57th Place Anchorage, Alaska 99501-3539 Anchorage, AK 99518 (907) 273-1700 main (907)273-4760 fax WELL NAME API # SERVICE ORDER # FIELD NAME SERVICE DESCRIPTION DELIVERABLE DESCRIPTION DATA TYPE DATE LOGGED CD2-58 50-103-20457-00-00 203-085 Colville River WL SBHPS-RBP FINAL FIELD 16-Aug-24 CD2-21 50-103-20504-00-00 204-245 Colville River WL Patch FINAL FIELD 18-Aug-24 CD2-467 50-103-20579-00-00 208-114 Colville River WL Patch FINAL FIELD 20-Aug-24 1B-07 50-029-20616-00-00 181-089 Kuparuk River WL MechCutter FINAL FIELD 24-Aug-24 2A-11 50-103-20057-00-00 186-003 Kuparuk River WL Isealate Patch FINAL FIELD 27-Aug-24 3F-11 50-029-21482-00-00 185-272 Kuparuk River WL IPROF FINAL FIELD 29-Aug-24 2A-20 50-103-20196-00-00 193-151 Kuparuk River WL IPROF FINAL FIELD 30-Aug-24 3F-20 50-029-22947-00-00 199-079 Kuparuk River WL IPROF FINAL FIELD 2-Sep-24 3J-18 50-029-22701-00-00 196-147 Kuparuk River WL Lee-PPROF FINAL FIELD 3-Sep-24 2U-12 50-029-21304-00-00 185-041 Kuparuk River WL PPROF FINAL FIELD 4-Sep-24 1D-39 50-029-22997-00-00 200-216 Kuparuk River WL Punch-Cut FINAL FIELD 9-Sep-24 2P-448A 50-103-20396-01-00 202-005 Kuparuk River WL Punch FINAL FIELD 10-Sep-24 2P-432 50-103-20420-00-00 202-091 Kuparuk River WL Punch FINAL FIELD 11-Sep-24 2P-434 50-103-20467-00-00 203-153 Kuparuk River WL Punch FINAL FIELD 11-Sep-24 Transmittal Receipt ________________________________ X_________________________________ Print Name Signature Date Please return via courier or sign/scan and email a copy to Schlumberger. Nraasch@slb.com SLB Auditor - TRANSMITTAL DATE TRANSMITTAL # A Delivery Receipt signature confirms that a package (box, envelope, etc.) has been received. The package will be handled/delivered per standard company reception procedures. The package's contents have not been verified but should be assumed to contain the above noted media. # Schlumberger-Private T39555 T39556 T39557 T39558 T39559 T39560 T39561 T39562 T39564 T39565 T39566 T39567 T39668 T39563 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.09.13 08:31:59 -08'00' 2A-20 50-103-20196-00-00 193-151 Kuparuk River WL IPROF FINAL FIELD 30-Aug-24 T3956 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, July 1, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Adam Earl P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. 2A-20 KUPARUK RIV UNIT 2A-20 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/01/2024 2A-20 50-103-20196-00-00 193-151-0 W SPT 5786 1931510 1500 2290 2290 2290 2290 220 250 300 300 4YRTST P Adam Earl 5/19/2024 4-year MIT-IA passed on less than 2% loss 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:KUPARUK RIV UNIT 2A-20 Inspection Date: Tubing OA Packer Depth 990 1760 1740 1725IA 45 Min 60 Min Rel Insp Num: Insp Num:mitAGE240521072517 BBL Pumped:1 BBL Returned:1 Monday, July 1, 2024 Page 1 of 1              MEMORANDUM TO: Jim Regg P.I. Supervisor FROM: Lou Laubenstein Petroleum Inspector Well Name KUPARUK RIV UNIT 2A-20 Insp Num: mitLOL200511063840 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 13, 2020 SUBJECT: Mechanical Integrity Tests ConocoPhillips Alaska, Inc. 2A-20 KUPARUK RIV UNIT 2A-20 Sre: Inspector Reviewed Byy:� P.l.Suprv;TDP— Comm DP Comm API Well Number 50-103-20196-00-00 Inspector Name: Lou Laubenstein Permit Number: 193-151-0 Inspection Date: 5/10/2020 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 2A-20 Type Inj W -TVD 5786 - Tubing 2130 2130110 2130 PTD 1931510 Type Test SPT Test psi 1500 ]A 920 3000 2970 2960 BBL Pumped: 2,$ ' BBL Returned: 2.8 "� OA 85 310 - 310 310 Interval 4vRTsr P/F P j Notes: Good test Wednesday, May 13, 2020 Page I of I • 0 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday,May 09,2016 TO: Jim Regg P.I.Supervisor efe( Ckill 16' SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 2A-20 FROM: Johnnie Hill KUPARUK RIV UNIT 2A-20 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry Ji(.2_ NON-CONFIDENTIAL Comm Well Name KUPARUK RIV UNIT 2A-20API Well Number 50-103-20196-00-00 Inspector Name: Johnnie Hill Permit Number: 193-151-0 Inspection Date: 5/7/2016 Insp Num: mitJWHl60508214221 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well F 2A-20 -'Type j W'iTVD 5786 . Tubing j 2075 - 2075 i 2075 - 2075 - YP InJ PTD 1931510 Type Test;SPT'Test psi 1500 -! IA 720 2900 - 2870 . --' 36 . Interval 4YRTST P/F P ' ! OA 20 . 20 20 20 - I I Notes: 4 bbls diesel SCANNED SEP 2 7 2016 Monday,May 09,2016 Page 1 of 1 Wallace, Chris D (DOA) From: NSK Problem Well Supv <n1617@conocophillips.com> Sent: Tuesday,June 16, 2015 4:49 PM To: Wallace, Chris D (DOA) Cc: Senden, R.Tyler; NSK Problem Well Supv Subject: RE: 2A-20 (PTD 193-151) Report of IA pressure anomaly update 10-12-14 Attachments: Picture (Device Independent Bitmap) 1jpg; 2A-20 90 Day TIO plot.JPG Chris- 2A-20(PTD#193-151) monitor period is nearing the end. The scheduled shut in date is June 20 but the well will be shut in prior due to the CPF2 summer maintenance shut down. During the 24 days of the 30 day monitor period the IA did not show indications of TxIA communication while on gas injection and therefore the well will be returned to normal injection status. Please let us know if you have any questions or disagree with the plan. Attached is the 90 day TIO plot. Dusty Freeborn /Jan Byrne Problem Wells Supervisor ConocoPhillips Alaska, Inc. Office phone: (907)659-7126 Cell phone: (907)943-0450 illiWELLS TEAM conor&hsrp+ SCANNED AIN 2 6 2 01 Well Name 2A-20 Notes: Start Date 4/17/2015 Days 60 #N;A End Date 6/1612015 #N/A Annular Communication Surveillance LCCC - - 170 WHP LA- HOC A- 165 HOC — 18C 25CC L n 20CC - 155, CL � z 1E0C 150 10CC — 14E x•00 0 i 140 May-1E Jun-1E t.1ay-1E Jun-15 Date From: NSK Problem Well Supv Sent: Thursday, May 21, 2015 3:32 PM To: 'Wallace, Chris D (DOA)' Cc: Senden, R. Tyler Subject: RE: 2A-20 (PTD 193-151) Report of I ssure anomaly update 10-12-14 Chris, 2A-20's tubing head adaptor and tree were changed out on 5-11-15. Because the MV flange leak was gas-only, we performed a shell test to 2950 psi using nitrogen, in addition to the normal 5000psi test using diesel, both of which passed. The well is being returned to gas injection today to resume monitoring for the previously reported potential 2 Wallace, Chris D (DOA) From: NSK Problem Well Supv <n1617@conocophillips.com> Sent: Thursday, May 21, 2015 3:32 PM To: Wallace, Chris D (DOA) Cc: Senden, R.Tyler Subject: RE: 2A-20 (PTD 193-151) Report of IA pressure anomaly update 10-12-14 Chris, 2A-20's tubing head adaptor and tree were changed out on 5-11-15. Because the MV flange leak was gas-only,we performed a shell test to 2950 psi using nitrogen, in addition to the normal 5000psi test using diesel, both of which passed. The well is being returned to gas injection today to resume monitoring for the previously reported potential TxIA communication on gas only. Since an extended period of time has passed since the well was shut in,we will reset the 30 day diagnostic monitor clock to begin today. If communication on gas reappears, CPAI intends to WAG the well to water injection and monitor for an additional 30 days in anticipation of an AA submittal. A follow-up email will be provided at the conclusion of the monitor period. Please let us know if you disagree with the plan forward. Brent Rogers/Kelly Lyons Problem Wells Supervisor ConocoPhillips Alaska, Inc Desk Phone(907)659-7224 Pager(907)659-7000 pgr 909 om: NSK Problem Well Supv SCANNE [4?A" 2 7 20 15 Se • nday, October 12, 2014 3:45 PM To: Wa - Chris D (DOA) Cc: Senden, R. er Subject: RE: 2A-20 • ' 193-151) Report of IA pressure anomaly update 10-12-14 Chris, As planned per the update below, 2A-20 was &G'ed to gas injection on 09-05-14. On 09-09-14, a gas-only leak at the wellhead was discovered. The well was WAG'ed to er injection for 2 days to flush the gas from the near wellbore area to allow 2A-20 to be safely secured. The well has be but in since 09/11/14 and secured with a downhole tubing plug since 09/12/14. The well is anticipated to be shut in for an nded period of time, awaiting equipment that will repair the gas-only leak. After the wellhead repair is completed, it is C coPhillips' intention to resume the 30 day monitor period on gas. Brent Rogers/Kelly Lyons Problem Wells Supervisor ConocoPhillips Alaska, Inc Desk Phone (907)659-7224 Pager(907) 659-7000 pgr 909 From: NSK Problem Well Supv Sent: Monday, September 01, 2014 4:37 PM To: Wallace, Chris D (DOA) Cc: CPF2 Prod Engrs; Senden, R. Tyler Subject: RE: 2A-20 (PTD 193-151) Report of IA pressure anomaly 1 Pages NOT Scanned in this Well History File · · XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /~"/~/ File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color· items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original - Pages: Other- Pages: DIGITAL DATA Diskettes, No. [] Other, No/Type · OVERSIZED · [] Logs *of various kinds . [] Other COMMENTS: · 13 Scanned by: Bever~' Dia~athan Lowell , , TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date:, Is/ MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO Jim Re �p DATE: Monday,May 07,2012 P.I.Supervisor ' 99 I i-7 II 2/ SUBJECT:Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 2A-20 FROM: John Crisp KUPARUK RIV UNIT 2A-20 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry .T2_ NON-CONFIDENTIAL Comm Well Name KUPARUK RIV UNIT 2A-20 API Well Number 50-103-20196-00-00 Inspector Name: John Crisp Permit Number: 193-151-0 Inspection Date: 5/1/2012 Insp Num: mitJCr120503082732 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 2A-20 Type Inj TVD ? 5786 IA 980 2800 2720 I 2690 PTD 1931510 Type Test I SPT Test psi 1500 OA 320 500 500 t 500 - Interval JaYRTST - 'P/F P -I Tubing i 1944 T 1951 , i 1943 I 1949 Notes: 4.3 bbls pumped for test. SCANNED MAR 1 3 2014 Monday,May 07,2012 Page 1 of 1 ~~~~~~~~ I V / ''~,i F , N0.4985 Schlumberger -DCS 2525 Gambell Street, Suite 400 ~~ Anchorage, AK 99503-2838 `~~f,~~~~ ~-~~-~~ ~~ ~~~~ f~ ATTN: Beth \ "~ ,(~ 1 ,~, ~J Well Job # Log Description Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Kuparuk Date BL Color CD 11 /25/08 2V-07 12096561 INJECTION PROFILE ~ 10/31/08 1 1 3A-11 12100434 INJECTION PROFILE 10/31/08 1 1 1G-09 12100434 INJECTION PROFILE 3 ~- 11/01/08 1 1 2V-11 12061724 PRODUCTION PROFILE ~- ~ 11/02/08 1 1 2C-14 12096565 PRODUCTION PROFILE L - 11/04/08 1 1 30-01 11975792 LDL 3 11/05/08 1 1 3F-09 12100435 PRODUCTION PROFILE 11/06/08 1 1 2V-12 12096567 PRODUCTION PROFILE - (~ 11/06/08 1 1 3A-07 12096568 INJECTION PROFILE '-"~ 11/07/08 1 1 2A-20 12100434 INJECTION PROFILE ' -` 11/08/08 1 1 1G-17 11975792 LDL - 11/09/08 1 1 2U-04 12100434 INJECTION PROFILE (~- 11/10/08 1 1 2U-05 12096572 INJECTION PROFILE _ ~ -- 11/12/08 1 1 1F-06 12100457 PRODUCTION PROFILE 11/13/08 1 1 iB-06 12080456 PRODUCTION PROFILE 11/13/08 1 1 1B-05 12080457 INJECTION PROFILE ~(y 11/14/08 1 1 2U-10 12080459 PRODUCTION PROFILE - ~ 11/16/08 1 1 2C-15 12100462 PRODUCTION PROFILE C 11/18/08 1 1 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. • STATE OF ALASKA ~ii~~ ~rnu0~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~ i~ ~ ~~~ ~Q'1,.~ f.~01''}f''1,~SIlJf~ REPORT OF SUNDRY WELL OPERA~~~S en~~A~~, r 1. Operations Pertormed: Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^/ . Other Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Time Extension ^ Change Approved Program ^ Operat. Shutdown^ Perforate ^ Re-enter Suspended Well ^ 2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number: ConocoPhillips Alaska, InC. Development ^ Exploratory ^ 193-151 / - 3. Address: Stratigraphic ^ Service ^/ 6. API Number: P. O. Box 100360, Anchora e, Alaska 99510 50-103-20196-00 ' 7. KB Elevation (ft): 9. Well Name and Number: RKB 135'; Pad 94' GL 2A-20 ' 8. Property Designation: 10. Field/Pool(s): , ADL 25571 ~ Kuparuk River Field /Kuparuk Oil Pool 11. Present Well Condition Summary: Total Depth measured 11545' , feet true vertical 6178' . feet Plugs (measured) Effective Depth measured 11392' feet Junk {measured) true vertical feet Casing Length Size MD TVD Burst Collapse Structural CONDUCTOR 121' 16" 121' 121' SURFACE 4167' 9-5/8" 4167' 2795' PRODUCTION 11528' 7" 11528' 6166' Perforation depth: Measured depth: 11116'-11126', 11128'-11148', 11150'-11160', 11178'-11216' true vertical depth: 5869'-5876', 5877'-5892', 5893'-5900', 5913'-5941' ~~~ JUL ~ ~ 2008 Tubing (size, grade, and measured depth) 3-112" , L-80, 11030' MD. Packers i~ SSSV (type & measured depth) pkr- BAKER'FHL' pkr- 11004' Camco W-1 Selective nipple @ 1803' 12. Stimulation or cement squeeze summary: Intervals treated (measured) Treatment descriptions including volumes used and final pressure: 658 bbl Seawater 13, Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation 4626 -- Subsequent to operation 4493 14. Attachments 15. Well Class after work: Copies of Logs and Surveys run _ Exploratory ^ Development ^ Service ^~ Daily Report of Well Operations _X 16. Well Status after work: Oil^ Gas^ WAG^ GINJ^ WINJ ^~ WDSPL^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: none contact John Peirce @ 265-6471 Printed Name John Peirce Title Wells Group Engineer Signature ~ Phone: 265-6471 Date ~p/Z~+~B~j ^- re h ron Allsu Dr k 263-4612 j'~ j~ AAA S lB~l, ~~~ 2 ~ 2ooe ~~'~~~o~S Form 10-404 Revised 04/2006 1 t i-{ ~ ~ ~ n ~ ~ ~ Submit Ori i I Qr~ = V 111 \\\ (v '~'' '!' • 2A-20 Well Events Summary • DATE SUMMARY 5/20/08 RIH AND TAGGED HARD FILL @ 11440' CTMD.BATCH UP 6800# OF 20/40 RIVER SAND AND PUMPED A 29 BBL SLURRY.TAGGED SAND TOP AFTER 1 HOUR @ 11168' CTMD, PUH AND WAITED 30 MINS AND TAGGED SAND TOP @ 11159' CTMD.WELL SHUT AND FREEZE PROTECTED AND READY FOR HPBD. 5/31/08 Pumped HPBD with slick seawater. Pumped 658 bbl of slick seawater, final pump was 7.5 bpm @ 4000 psi. Freeze protected tubing with 25 bbl of 60/40. 6/5/08 PERFORM FILL CLEAN OUT TO HARD TAG @ 11441 CTMD (APPROX 240 FT BELOW PERFS) TURNED WELL OVER TO DSO. 6/8/08 TAGGED @ 11392' SL. JOB COMPLETE. ~~.._.___, t.. ` Cor~occ~illips .......I i 1'~Sa c;~, iRIAM cone NIP, Su Prod1 GAS ti 11 1 i 1' 1' tkit 1 H~171 x-11 1a3a a~a PmEu Slelua 11,392.0 ~ 6/6/2008 Rev Reason: TAG PILL Top (ND) Btm (TND) Dens Shot 86n IftKel (ftK8) (ftKB) TYPe Zone (shot... Total 2A-20 Depth (ftKB) 11.528.0 teleese DMa 10!24!1993 11 Inn6i wlliecrtp c.:~n rop .n.eV 5,8!5.- -_:0 ~- U ~UE SRD 11t71~ MEMORANDUM To: Jim Re `~ P.I. Supervisor ~j FROM: John Crisp Petroleum Inspector State of Alaska • Alaska OiI and Gas Conservation Commission DATE: Wednesday, May 07, 2008 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 2A-26 KUPARUK RIV liNIT 2A-20 Src: Inspector NON-CONFIDENTIAL Reviewed Bv: P.I. Suprv ~~~(' - Comm Well Name: KUPARUK RN UNIT 2A-20 API Well Number: so-103-20195-00-0o Inspector Name: John Crisp Insp Num: mitJCr0 80 5 040 9044 1 Permit Number: 193-1~1-0 Inspection Date: 5/2/2008 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. -- - ---- -- 2A-20 W ~ 578 950 2100 2040 i 2030 ~ Well ~ ';Type Inj. ~ TVD IA -- -- yP --- -- - -- -- --- P.T. i 1931s1o ;;T eTest ~ sPT', Test psi zloo X OA ioo ' ioo ~ loo goo - 4YxTST F P ,~ Tubing ~, ~sso '~ z42o ! zazo ~ z4zo Interval P/ -y--- ----- - - -,-- NOteS: 4.7 bbl's pumped for test- ~~~~~ M~tY `I ~ 2~U~ Wednesday, May 07, 2008 Page 1 of l ~. ~~ -- YIr~~Alii~~~~1- Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 I • ~ '- ~ '~~+~~~~ ~ °~~~~~~ F~B ~ ~. ~~~~ ATTN: Beth <Y<_~ N0.4550 Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Kuparuk 01/11/08 U Well Job # Log Description Date BL Color CD 1J-164 11964565 INJECTION PROFILE _ C. 01/04108 1 3Q-22 11970623 PRODUCTION PROFILE - I 01/04/08 1 3R-21 11964567 LDL 01106/08 1 3J-12 11970620 INJECTION PROFILE '= j _ - a 01/01/08 1 3H-106 11964562 PATCH EVALUATION/LDL V ~ C~ O "-' 1 01/01108 1 1F-01AL1 11994591 FLOWING BHP SURVEY ~ 12/20/07 1 2N-342 11964561 OILPHASE SAMPLER '~-, 12131107 1 2L-330 11970618 SCMT - a 12/30107 1 2A-20 10194199 RST - 10/30107 1 1 2X-19 11850441 RST - 1 ~ ~ 07/09/07 1 1 • Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. 11 /26/07 Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~~~~~~~~ N~v ~ ~ 207 N0.4513 Company I~~~l~) Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Well Job # Log Description Kuparuk Date BL Color CD 2N-310 11839685 PERF RECORD/SBHP SURVEY ~ ~; ~ `~? ~ ~ ;~': 11/17/07 1 2Z-01A 11837536 PRODUCTION PROFILE .:;~~j"-?.-~-- f 11/16/07 1 3R-14 11839686 LDL I - `.~ -- - ••~.' ^" - 11/18107 1 2M-10 11839687 PRODUCTION PROFILE ":~ ~ --- ~ °°~ ~~ 11/19/07 1 3J-10 11837539 PRODUCTION PROFILE ii=i `Mt~^`"-%' 11/19/07 1 2A-20 11839688 INJECTION PROFILE -° t~+ c' .- -'° ~ 11/20/07 1 • • Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. ~~ I E • N011 2 ~ ~p07 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Alaska Oil & Gas Cons. COmmiss'rani REPORT OF SUNDRY WELL OPERATIONS pgCh~~a~a 1. Operations Performed: Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Other ^ Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Time Extension ^ Change Approved Program ^ Operat. Shutdown^ Perforate ~ Re-enter Suspended Well ^ 2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number: COnoCOPhlllips Alaska, InC. Development ^ Exploratory ^ 193-151 / 3. Address: Stratigraphic ^ Service ^/ 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-103-20196-00 7. KB Elevation (ft): 9. Well Name and Number: RKB 135', Pad 94' GL 2A-20 8. Property Designation: 10. Field/Pool(s): ADL 25571, ALK 2669 Kuparuk River Field /Kuparuk Oil Pool 11. Present Well Condition Summary: Total Depth measured 11545' feet true vertical 6178' feet Plugs (measured) Effective Depth measured 11205' feet Junk (measured) true vertical 5933' feet Casing Length Size MD ND Burst Collapse Structural CONDUCTOR 121' 16" 121' 121' SURF CASING 4032' 9-5/8" 4167' 2795' PROD CASING 11393' 7" 11528' 6166' Perforation depth: Measured depth: 11116'-11126', 11128'-11148', 11150'-11160', 11178' -11216' true vertical depth: 5869'-5876', 5877-5892', 5893'-5900', 5913'-594~~~A,i~ ~rlv ~ ~ ~rq~r D~ v t,+ Tubing (size, grade, and measured depth) 3-1/2" , L-80, 11030' MD. Packers & SSSV (type 8~ measured depth) pkr- BAKER'FHL' pkr= 11004' Camco'W-1'selective nipple @ 1803' 12. Stimulation or cement squeeze summary: Intervals treated (measured) not applicable Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation 2287 -- Subsequent to operation 3179 -- 14. Attachments 15. Well Class after work: Copies of Logs and Surveys run _ Exploratory ^ Development ^ Service 0 Daily Report of Well Operations _X 16. Well Status after work: Oil^ Gas^ WAG^ GINJ^ WINJ ^~ WDSPL^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NSA if C.O. Exempt: none Contact Guy Schwartz @ 265-6958 Printed Name Guy Schwartz _,__. Title Wells Group Engineer Signature ''° _ Phone Date `~ Zj-° ~. Pre ared b Sh n A11su Drake 263-4612 ( ~ \ Form 10-404 Revised 04/2006 v ~ - - ~ `~1~~ ~ " ~~~~ ~ «(~v Submit Original Only • 2A-20 Well Events Summary DATE Summary 10/15/07 TAGGED @ 11173' SLM. DRIFTED TBG WITH 20' x 2.125" TO 11173' SLM. WELL READY FOR E/L PERFORATING. 10/30/07 RAN RST SIGMA LOG AND PERFORATED WITH 2" POWERJET OMEGA HSD GUNS FROM 11128-11148'. RESULTS: LOGGED AND OVERLAYED THREE RST SIGMA PASSES FROM 11205' THROUGH THE END OF TUBING. TOOK SBHP MEASUREMENT PRIOR TO PERFORATING AT 11128' (3388 PSI AND 127.3 DEG F). PERFORATED WITH 2" POWERJET OMEGA FROM 11128-11148'. TUBING PRESSURE 1000 PSI BEFORE PERFORATING AND 1100 PSI AFTER PERFORATING. • ~' ~~ KRU 2A-20 CnnoCpPhillips ~-laska, Inc, 2A-20 _ _ _ _ _ - _ - -_ _ __ -- -_-, NIP (1803-1804, OD:3.500) TUBING (0-11030, OD:3.500, ID:2.992) SURF CASING (o-2sso, OD:9.625, Wt:47.00) Gas Lift i ndrel/Dummy Valor 1 :10941-10942, OD:5.968) PBR :10990-10991, OD:3.500) PKR ;11004-11005, OD:5.938) NIP "11019-11020, OD:3.500) SOS ;11029-11030, OD:3.859) TTL ;11030-11031, OD:3.500) Pert ;11116-11126) Perf ;11150-11160) API: 501032019600 Well T e: INJ An le o1 TS: 43 de a)1110ts SSSV Type: NONE Orig 10/24/1993 Angle @ TD: 44 deg @ 11545 Com letion: Annular Fluid: Last W/O: Rev Reason: TAG FILL, PERF Reference Lo Ref Lo Date: Last U date: 11/6/2007 Last Ta 11205' WLMD TD: 11545 ftKB Last Tag Date• 10/30/2Q07 Max Hole A~gle• S9 deg n 3532 Casing String -CONDUCTOR Description Size Top Bottom ND Wt Grade Thread CONDUCTOR 16.000 0 121 121 62.50 H-40 Casing Stringy -SURFACE Descri lion Size To Bottom TVD 1Mt Grade Thread SURF CASING 9.625 0 2990 2337 47.00 L-80 SURF CASING 9.625 2990 4167 2795 36.00 L-80 Casin Strin -PRODUCTION ~' Descri lion Size To Bottom TVD Wt Grade Thread PROD CASING 7.000 0 11528 616.6 26.00 L-80 _ _ Tubing String -TUBING _ _ _ Size ~ Top Bottom ~ TVD ~ VNt ~ Grade ~ Thread .' 500 0 110 30 5205 9.30 L-30 EUE 2RD MOD I Perforations: Summa _ _ _ __ Infurv~l TVf) 7nnn _ Cmtuc F1 ~ CPF ~ I7atn Tvna I Cnmmwni I 11116 - 11126 5869 - 5876 C-4 10 6 6/17/2000 APERF 2 1/2" HC Power Jet, 60 de h 11128 - 11148 5877 - 5892 C-4 20 6 10/30/2007 APERF 2" PJ OMEGA 60 deg random 11150 - 11160 5893 - 5900 C-4 10 6 6/17/2000 APERF 2 1/2" HC Power Jet, 60 de h l1l RS - I lZlb byl3- b`J4l ~ H-3 I I .Sg I 4 ~ .Srn/ lyy4 ~ Irtrcr ~ w uc~ nau: lau o~ pn ~ ~s LifEMandrelsNahres __ _ St ~ MD TVD ~ Man Mfr ~ Man Type ~ V Mfr ~ V Type ~ V OD ~ Latch ~ Port ~ TRO ~ Date Run ~ Cmnt 1 10941 5739 Camco MMM DMY 1.5 RK 0.000 0 5/3/1994 Other (plug_s, equip., etc.) -COMPLETION I De th TVD T e Descri ion ID 1803 1706 NIP Camco'W-1' Selective 2.813 10990 5776 PBR Baker Sheared 3.000 11004 5786 PKR Baker'FHL' 3.000 11019 5797 NIP Camco'D' Ni le NO GO 2.750 11029 5805 SOS Baker 2.992 Perf ,11178-11216) `` ®~ ~ 9 Alaska P.0. BOX 100360 ANCHORAGE, ALASKA 99510-0360 November 12, 2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Maunder: k ~~~ ~~~~ ~ ~ 2QI~7 Enclosed please find a spreadsheet with a list of we1ls..from the Kuparuk field (KRL)7. Each_of - - these wells was found to have a void in the conductor. ~'hese voids were. filled with a corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The corrosion inhibitor/sealant was pumped on November 10, 2007. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call myself or MJ Loveland at 907-659-7043, if you have any questions. Sincerel , ~~~ ~ ~~ Perry Klei ~~ ~~ ~ ~ \ ~': ConocoPhillips Well Integrity Projects Supervisor ~J • ~nC® hillipS l~~'C1C, Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) ~~+ Kuparuk Field 11110!2007 ell Name TD # vac Initial top of cement Vol, of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft al 2A-15 2A-16 2A-19A 2A 20 2A-24 2A-25 185-146 185-147 201-083 193-151 193-144 196-062 5" 39" 12" 9" 5" 10" NA NA NA NA NA NA 5" 39" 12" 9" 5" 10" NA NA NA NA NA NA 3.5 21 6 7.5 2 2 11/10/2007 11/10/2007 11/10/2007 11/10/2007 11/10/2007 11/10/2007 .,~_ ôJk----,--- ..., 01/02107 Schlum~el'ger NO. 4092 Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 $c;ANNED JAN 0 8 2007 Company: U.LC- {Cr3 -{~( Field: Kuparuk Well Job# Log Description BL Color CD Date 2N-304 11416232 FBHP SURVEY 10/30/06 1 2N·304 11296737 FBHP SURVEY 11/04/06 1 10-109 N/A INJECTION PROFILE 11/27/06 1 1J-136 (REDO) 11534188 US IT 12/10/06 1 1R-18 N/A SBHP/DD 12/18/06 1 1G-16 11551836 INJECTION PROFILE 12/19/06 1 10-103 11548555 INJECTION PROFILE 12/20/06 1 3K-09A N/A SBHP SURVEY 12/22/06 1 3K·26 N/A SBHP SURVEY 12/22/06 1 3K-18 11551838 SBHP SURVEY 12/23/06 1 2N-326 11551840 SBHP SURVEY 12/24/06 1 35-19 11548564 PRODUCTION PROFILE 12/25/06 1 2M-10 11551841 PRODUCTION PROFILE 12/25/06 1 2M-16 11551842 INJECTION PROFILE 12/26/06 1 2A·20 11548565 INJECTION PROFILE 12/26/06 1 2M-15 11551843 PRODUCTION PROFILE 12/27/06 1 2M-22 11538773 PRODUCTION PROFILE 12/28/06 1 1 J-184 11538775 PRODUCTION PROFILE 12/30/06 1 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. . . MEMORANDUM State of Alaska Alaska Oil and Gas Conserntion Commission TO: Jim Regg P.I. Supen'isor ~ ''''11 tJZ~D4 D:\ TE: Wednesday. June 23. 200-1 SlIBJECT: l\lechanicallntegTlt) Tests CONOCOPHILLlPS ALASKA INC 2A.20 FROM: Chuck Scheve Petroleum Inspector KUPARUK RIV UNIT 2A-20 Src: Inspector Reviewed By: P.I. Supn'- ~W--- Comm NON-CONFIDENTIAL \Vell Name: KUPARUK RJV lTNIT 2A-20 Insp Num: milCS040621125334 Rei Insp Num: API Well Number: 50-103-20196-00-00 Permit Number: 193-151-0 Inspector Name: Chuck Scheve Inspection Date: 6/20/200-1 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 2A-20 Type Inj. P TVD 6]78 IA 1800 2460 2..30 2..20 P.T. 1931510 TypeTest SPT Test psi 1..-16.5 OA 20 140 100 100 Inten/al H"RTST PIF P Tubing 2050 2050 2050 2050 Notes: The pretest pressures were observed for 30+ minutes and found stable. Well demonslrated good mechanical inlegrit). Wednesday. June 23.2004 Page I of 1 MEMORANDUM TO: THRU: FROM: Dan Seamount Commissioner Blair Wondzell P.I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: Sept. 1,2000 Jeff Jones ~J ~- ¢../. Petroleum Inspector NON- CONFIDENTIAL SUBJECT: Mechanical Integrity Tests Phillips Alaska Inc. 2A Pad 2A-01A, 2A-02, 2A-03, 2A-04, 2A-06, 2A-08, 2A-20, 2A-21,2A-23 KRUIKuparuk River Field P.T.D.I Notes: Well! P.T.D.I Notes: WellI - P.T.D.I Notes: 2A-01A 1840570 2A-02.I 1840500 PaCker Depth Pretest Initial 15 Min. 30 Min. Type lnj.I G I'T'V'D' I 5796 I Tubing I 3500 I 3500 I 3500 !' 3500 I lntervall 4 Type testI P I TeStpsil 1449 I CasingI 520 I 17~0 I 1760 I 1760 I P/F I PI Type lnj.I S IT'V'D' I 5800 I TubingI ~o I ~so I ~o I~o I lntervalJ' 4 TypetestI P ITestPsil 1450 I CasingI 575 I 1710 I 1700 1.1710 I P/F I P 2A-03 I Typelnj:l. G IT'V'D' I 5645 Imubingl 3550 I 3500 I 35.00 I 3500 I lnte~all 4 1840510ITypetestl P ITestpsiI 1461 l Casingl 1160I 1675I 16101 16101 PIE I _P we,I 2A-04 I T~.~nJ.I G I'T'v'D' I 581'3 ITubingl 36°°l 3600 I ~281 ~=~ l lnterva~l 4 .p.T.D.I 1840530ITypetestl P I Testpsil 1453 ICasingl 115011690116801168O1 P/ElI= Notes: w.,,I ~A-O~ l~,.i.i ~ I' T.V.D. I 5773 I Tubing I 3650 I 36O0 J 3600I 3600 I,.terva~l 4 P.T.D.I 1840640 Imypetestl P l mestpsil 1443 ICasingI 1650I 2200 I 2200 I 2200 I P/F I P Notes: w...I ~^-o~ I~,.i~i:l s IT.V.~. I 5785 ITubingl 27251 ~ I ~ I~ I'~"~"'1" P.T.D.I 1852480 ITYPetestl P ITestpsil 1446 I Casingl 950 I 1625 J 1625 I 1625 i P/F ! P Notes: WellI 2A-20 I~ypelnj. I S (T.V.b. [ 5786 ITUbing[ 2850I 2850I 2850I 2850 I lntervall 4 P.T.D.I 1931510 ITypetestJ P I-Testpsil 1447 I CasingI 1175I 1700I 1725 J 1710 J P/F I l= Notes: WellI 2A-21 P.'T.D:I 1931330 Notes: Well.I 2A-23 P.T.D.I 1931420 Notes: Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING i Typ.'rAj.! s i ~.v.~. 15774 i Tubingl =700 I=~00 I =?00 I =~00 l lntervall 4 Type testI p I mestpsil 1444 I CasingI 600 I 1720 I 1725 I 1725I P/F Il=' I Typelnj.I S IT.V.D.I 5765 ITubingl 1125 I 1150 I 1150 i 1150 I lntervall 4 ' TypetestI P JTestpsiI 1441 I CasingI 600 I ~850 I ~S~0 I ~00 I P/F I P-- Type TeSt M= Annulus Monitoring ' P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O= Other (describe in notes) Test's Details Wednesda% Aug. 30, 2000: I traveled to Phillips Alaska Inc.'s KRU 2A pad to witness the 4 year MITs on wells # 0lA, 0A, 03, 04, 06, 08, 20, 21, 23. Jerry Dethlefs was the PlA rep. In charge of testing. The standard annulus pressure test was performed with all nine wells passing the 30 minute pressure test. Summary: I witnessed nine successful MITs on PlA's KRU 2A Pad. M.I,T.'s performed; ~ Number of Failures: Attachments: Well schematics {9) 0_. Total Time dudng tests: 8 hrs cc: MIT report form 5/12/00 L.G. MIT KRU ZA 8-30-00 JJ.xls 9/5/00 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) Phillips Alaska, Inc. Development__ RKB 135 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 100360 Stratigraphic__ Anchorage, AK 99510-0360 Service__X Kuparuk Unit 4. Location of well at surface 8. Well number 696' FSL, 53' FEL, Sec. 14, T11 N, R8E, UM (asp's498340, 5960119) 2A-20i At top of productive interval 9. Permit number / approval number 1239' FNL, 2042' FWL, Sec. 22, T11N, R8E, UM (asp's 489877, 5958191) 193-151 At effective depth 10. APl number 50-103-20196 At total depth 11. Field / Pool 1269' FNL, 1746' FWL, Sec. 22, T11 N, R8E, UM (asp's 489581, 5958161) Kuparuk Oil Pool 12. Present well condition summary Total depth: measured 11545 feet Plugs (measured) Tagged Fill (6/10/00) @ 11215' MD. true vertical 6178 feet Effective depth: measured 11215 feet Junk (measured) true verUcal 5940 feet Casing Length Size Cemented Measured Depth True vertical Depth CONDUCTOR 121' 16" 200 Sx Cmt 121' 121' SURF CASING 4032' 9-5/8" 700 Sx AS III, 675 Sx G 4167' 2795' PROD CASING 11393' 7" 200 Sx Class G 11528' 6166' Perforation depth: measured 11116 - 11126'; 11150 - 11160'; 11178 - 1121 6' , - - - true vertical 5869 5876';5893 5900';5913 5941 RECE1V .D Tubing (size, grade, and measured depth) 3.5", 9.3#, L-80, Tubing @ 11030' MD. Packers & SSSV (type & measured depth) Baker 'FHL' Packer @ 11004' MD. Camco 'W-I' Selective @ 1803' MD. Alaska Oil & Gas Cons. C. ommissinn 13. Stimulation or cement squeeze summary Anchorage Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation - 5800 2600 Subsequent to operation - 6000 2550 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations _._X Oil __ Gas __ Suspended __ Service __(WAG).__ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed //~, ~~ Title: Date Prepared by John Peirce 265-6471 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 2A-20i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 6/10/00: RIH &tagged fill @ 11215' MD. 6/17/00: MIRU & PT equipment. RIH w/perforating guns & shot 20' of perforations in the 'C4' sand as follows: Added perforations: 11116- 11126' MD 11150'- 11160' MD Used 2-1/2" carriers & shot the perfs at 6 spf at 60 degree phasing. POOH w/guns. RD. Returned the well to water injection & obtained a valid injection rate. RECEIVED FEB :i. 6 2001 Alaska Oil & Gas Cons. Commission Anchorage ON OR BEFORE IA L U N P~ M C :l.~ttt'OaF II-,I~I.DOC -': .... AOGCC Individual Well ;eoiogica! Materials Inventory Page ' 1 Date' 10/13/'95 PERMIT DATA T DATA_PLUS RUN DATE 93-151 5960 93-151 6244 4057-11544, OH-CDR/CDN I1544-~057= OHCDR/CDN CMPO 01/18/94 1 08/26/94 93 - 'i 51 ~URVEY 93-151 a/d~DN-LWD/DC R DIRECTIONAL L 9900-11407 L 4100-11530 11/29/93 11/22/93 ~MPO 01/ 8/94 93-151 c,~DR- LWD/DC2 93-151 .~R VER/LWD/DC 93- 151 ~ET L 4100-11530 L 10400-11510 L 9900-11431 C M P O 01 / 18 ,/94 CMPO 01,/18/94 11/22/93 Are dry ditch samples required? yes ~___And received? Was the well cored? yes ~Anaiysis & description rec~kved? yes no Are well tests required? yes ~i$2 Received? Well is in compliance ,~,% ~n'Ytz al COMMENTS ARCO Alaska, Inc. Date' August 26, 1994 Transmittal #: 9141 RETURN TO: ARCO Alaska, Inc. Attn: N. Sharlene Chang Kuparuk Operations File Clerk ATO-1263B P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. and return one signed copy of this transmittal. 2A-20 (Redo) LIS Tape and Listing: 08-22-94 CDR-CDN 2 Bit Runs With QRO Processing Receipt Acknowled DISTRIBUTION' Bob Ocanas Please acknowledge receipt 93497 State of Alaska Date: ARCO Alaska, Inc. Post Office Box 100350 Anchorage, Aias!.~a 99510-03C~0 May 9, 1994 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston: Attached in triplicate is an Application for Sundry Approval on the following Kuparuk well. Well Action 2A-20 Other (conv) If you have any questions, please call me at 263-4241. Sincerely, P. S. White Senior Engineer Kuparuk Petroleum Engineering Attachments Fi'R050295 (w/o atch) AR3B-6003-93 242-2(~03 STATE OF ALASKA ~ OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Alter casing _ Repair well Change approved program _ Operation Shutdown_ Re-enter suspended well _ Plugging _ Time extension Stimulate Pull tubing _ Variance _ Perforate _ Other _.x_ 2. Name of Operator ARCO Alaska, Irc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 696' FSL, 53' FEL, SEC. 14, T11N, RSE, UM At top of productive interval 1145' FNL, 1961' FWL, Sec. 22, T11N, R8E, UM At effective depth 1196' FNL, 1724' FWL, Sec. 22, T11 N, R8E, UM At total depth 1196' FNL, 1724' FWL, Sec. ~_2, T11 N, RSE, UM 6. Datum elevation (DF or KB) RKB 135'. Pad 94' GL 7. Unit or Property name Kuparuk River Unit feet 8. Well number 2A-20 9. Permit number 93-151 10. APl number 50-103-20196 11. Field/Pool Kuparuk River Field KuDaruk River Oil Pool 12. Present well condition summary Total Depth: measured 11,439 feet true vertical 6,086 feet Effective depth: measured 11,439 'feet true vertical 6,086 feet Casing Length Structural Conductor 80' Surface 4284' Intermediate Production 11494' Liner Perforation depth: measured ,' Size 16' 9.625" 7" Plugs (measured) Junk (measured) Cemented 20~) Sx CS 340 Sx Arcticset III 740 SX Class G 160 Sx Class G 11178' - 11216' MD-RKB true vertical 5932' - 5953' TVD Tubing (size, grade, and Measured depth) 3-1/2', J-55, 9298' MD Packers and SSSV (type and measured depth) Measured depth True vertical depth 121' 121' 4325' 2885' 11535' 6129' RECEIVED MAY 1 7 1994 Ai~ska. 0il & Gas Cons, Commission Anchorage Baker FHL retrievable packer 3-1/2' x 7' @ 9272' MD; Camco TRDP-2SSA SSSV 5.937' OD, 2.812' ID @ 1784' MD. 13. Attachments Description summary of proposal x Detailed operation program BOP sketch -- 14. Estimated date for commencing operation 5/10/94 16. If proposal was verbally approved Name of approver Russ Douglass ./~ Date approved 5/9/94 15. Status of well classification as: Oil __ Gas m Suspended Service X 17. I hereb~ certi,fy t. hat the foregoing is true and correct to the best of my knowled~le. FOR COMMISSION USE ONLY Date 5/10/94 Conditions of approval: Notify Commission so representative may witness Plug integrity g BOP Test Location clearance Mechanical Integrity Test ..~ Subsequent form require 10- IApproval No. Approved by order of the Commission Form 10-403 Rev 06/15/88 Original Signed By Oavid W. Johnston Commissioner ,~',,:', --,ved Copy q .~:,t u rned ATTACHMENT KUPARUK WELL 2A-20 Well 2A-20 was originally permitted as a production well. An analysis, of production and injection in the western expansion area of Drill Site 2A and the northern area of Drill Site 2M, was performed after the permit approval and drilling of Well 2A-20. The results of this analysis indicate oil rate and recovery of reserves would be maximized by converting 2A-20 to an injection well. Due to the findings of this study it is recommended that Well 2A-20 be converted to injection service. MAY 1 7 1994 0il & 6as Cons. Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIbSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well OIL [---~ GAS [~] SUSPENDED [~ ABANDONED[---] SERVICE ~'~ / ~/'IJ~C~' -~ 2 Name of Operator 7 Pe~it Number ARCO Alaska, lnc ~ ~ ~~g/ 93-151 3Address U ~ 8 APlNumber P.O. Box 100360, Anchorage, AK 99510-0360 50-103-20196 4 Location of well atsudace . ;? . _ 9 Unit or Lease Name At696'Top ProducingFSL' 53' Inte~alFEL" SEC 14, T 11 N,R SE, OM ?.' "~;-":?~ '~;.,: ,{T~; ':' ~ ~ h'[;~ ~~ 10 WelIKUPNumberARUK RIVER ~23a' FNL, 2O42' ~L, SEC 22, T~N, RSE, ....... At Total Dep~ UM' .... ~. --~ S ;..~ ~ ~; ~"- :~~~ ..... "~ ~' ~ 11 Field and Pool 1269' FNL, 1746' FWL, SEC 22, T11U, R8E, =~.-~..-~~ KUPARUK RIVER 5 Elevation in feet (indicate KB, DF, etc.) [ 6 Lease Designation and Serial No. KUPARUK RIVER RKB 135', PAD 94' GLJ ADL 25571 ALK 2669 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. ~ 15 Water Dep~, if offshore 16 No. of Completions 16-Oct-93 23-Oct-93 03/06/94(COM P)~ NA feet MSL 1 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+~D) 19 Directional~Su~ey~ 20 Dep~ where SSSV set 21 Thickness of pe~afrost 11545' MD, 6178' TVD 11439' MD, 6102' ~D YES ~ NO ~ 1803' SLN feet MD 1541 APPROX ~ Type Electric or Other Logs Run CDR, CDN, CET, CBT, GCT 23 CASING, LINER AND CEMENTING RECORD SE~ING DEPTH MD CASING SIZE ~ GRADE TOP ~ HOLE SIZE C~~ 16. 62.5ff H-40 SURF 121' 24" 200 SX CMT 9.625 47~/36ff L-80/J-55 SURF 4167' 12.25" 700 SX ASIII, 675 SX CLASS G CMT 7. 26~ L-80 SURF 11528' 8.5" 200 SX CLASS G CMT 24 Pedorations open to Production (MD+TVD of Top and BoSom and 25 TUBING RECORD inte~al, size and numbeO SIZE DEPTH SET (MD) PACKER SET (MD) 3-1/2- 9.3~ L-80 11030' 11004' 11178'-11216' 4 SPF MD 5841'-5869' TVD 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27 PRODUCTION TEST Date First Pr~uction Me~od of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~ GAS-OIL RATIO I TEST PERIOD ~ FIowTubing ~Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR ~TE ~ 28 CORE DATA Brief description of litholo~, porosi~, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .... ~ 0~ & G~s Cons. c0mm~ss~o~ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE -~9. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, alt fluids recovered and gravity, MEAS DEPTH TRUEVERT. DEPTH GOR, and time of each phase. TOP KUPARUK C 1111 5' 5868' 31. LIST OF ATTACHMENTS REPORT OF OPERATIONS, 2 COPIES OF DIRECTIONAL SURVEY 32. I hereby certify that the foregoing is true and correct to the best of my knowlege. Signed ~/~~'~~~ Title ~~,. ~/~/~ ~'/~/, DATE /~~~/ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO ALASKA INC. DAILY OPERATIONt PAGE: 1 WELL: BOROUGH: UNIT: FIELD: LEASE: API: PERMIT: APPROVAL: 2A-20 NORTH SLOPE KUPARUK RIVER KUPARUK RIVER ADL 25571 ALK 2669 50-103-20196 93-151 ACCEPT: 10/16/93 01:00 SPUD: 10/16/93 04:30 RELEASE: 03/06/94 03:30 OPERATION: DRLG RIG: PARKER 245 WO/C RIG: NORDIC 1 10/17/93 (1) PARKER 245 TD: 2791'(2791) 10/18/93 (2) PARKER 245 TD: 4185'(1394) 10/19/93 (3) PARKER 245 TD: 4185'( 0) DRILLING 16"@ 121' MW:10.0 VIS: 54 MOVE RIG F/2A-24 TO 2A-20. NU DIVERTER. 41.55' RT TO STARTING HEAD. FUNCTION TEST DIVERTER. WAIVED BY DOUG AMOS W/AOGCC. PU 2 STDS OF DC'S. PU 12.25" BHA-ORIENT TOOLS-C/O COND F/101'-121'. DRILL 1~ 25" HOLE F/121'-2791'. MIXED LCM F/1450'-240u;-6 SX F. MICHA & 3 SX F. WALNUT HULLS/HR(TOTAL 40 SX). TIH W/HOLE OPENER 16"@ 121' MW:10.2 VIS: 88 DRILL 12.25" HOLE F/2971'-4185'. PMP 60 HI VIS SWEEPS @ 3200' & 4100'. CIRC & COND MUD HOLE CIRC CLEAN. POOH TO 1200'. HOLE TIGHT & SWABBING F/2700'-1600'. PMP OUT OF HOLE F/1~95'-1390' UNABLE TO RIH W/BIT & MOTOR. FPOH. PU 12.25 H/O & ST~B. TIH. TAGGED UP & WASHED & REAMED F/1360'-1495' & 1870'-1960'. FRIH WORKING PIPE TO BTM-TIGHT ALL THE WAY. NO FILL. HOLE IN BAD SHAPE. CIRC & COND MUD. PMP HI VIS SWEEP & RAISED VIS IN SYSTEM TO 90 SEC/QT-LET MUD WT CLIMB TO 10.2 PPG. CIRC OUT LOTS OF PEA GRAVEL. CIRC HOLE CLEAN. POH-HOLE TIGHT UP TO 2150' WASH & REAM. HOLE IN WORSE SHAPE. LD TOP STAB & CLE~N UP BHA. START RIH. TESTING BOP'S 9-5/8"@ 4166' MW:10.2 VIS: 60 TIH W/H/O. WASH & REAM. CIRC & COND MUD. CUT MUD WT TO 10 PPG. CIRC HOLE CLEAN. POOH W/12.25" H/O. WASHED & REAMED UP F/2709'-1394'. LD STAB & H/O RU CASERS HOLD SAFETY MEETING. RAN 29 JTS 9-5/8" 36# ~-55 BTC & 76 JTS 9-5/8" 47# L-80 CSG. WASHED & PUSHED 7 JTS IN HOLE W/TOP DRIVE F/2224'-2478'. MU HGR, LANDING JT, & CMT HEAD. CIRC & COND MUD & HOLE W/CSG ON BTM @ 4166'. PMP 640 BBLS @ 300 PSI. FLUSHED CMT LINE W/25 BBLS WATER. TEST LINES TO 3500 PSI. SET & CMT 9-5/8" CSG W/SHOE @ 4166' & FC @ 4085'. DOWELL CMT'D PMPING 50 BBLS WATER AHEAD, 700 SX ASIII(241 BBLS) LEAD & 675 SX CLASS G(138 BBLS) TAIL. PLUG DOWN & JC @ 0015 HRS. PLUG BUMPED-DID NOT CIRC CMT TO SURF. LOST RETURNS W/240 BBLS DISPLACEMENT PUMPED & STOPPED RECIP W/85 BBLS DISP PMP. LD LANDING JT, CSG TOOLS. ND & SET BACK 20" ANN. DOWELL DID TOP JOB @ 120' PUMPING 15 BBLS WATER & 120 SX ASI @ 15.8 PPG. CIRC CMT TO SURF. CIP @ 0230 HRS 10/19/93. NU 13-5/8"-5000 BOP'S. TEST BOP'S @ REPORT TIME. RECEIVED API-R - 8 i9,°,4. Gas 6ohs. L;ommissio~ Anchorage WELL: 2A-20 API: 50-103-20196 PERMIT: 93-151 PAGE: 2 10/20/93 (4) PARKER 245 TD: 7433' (3248) 10/21/93 (5) PARKER 245 TD: 9605' (2172) 10/22/93 (6) PARKER 245 TD:10913' (1308) 10/23/93 (7) PARKER 245 TD:11477' ( 564) CIRC 9-5/8"@ 4166' MW: 9.6 VIS: 37 CONT TESTING BOPE TO 300/3000 PSI-OK. PU BHA, SURF TEST MWD TOOLS, RIH & TAG FC @ 4082'. BREAK CIRC & TEST CSG TO 2000 PSI F/30 MIN. DRILL PLUGS, FLOATS, CMT, & 10' NEW FORM TO 4195'. CIRC HOLE CLEAN. RUN LOT TO 12.6 PPG EMW. DRILL & MWD SURV 8.5" HOLE F/4195'-5468'. GAS CUT MUD TO SURF. CHECK WELL FOR FLOW. WELL FLOWING SLIGHTLY. CIRC OUT GAS CUT MUD. DRILL F/5468'-6440' WHILE INCREASING MUD WT IN 0.1 PPG INCREMENTS TO 9.6 PPG. GAS TO SURF F/APPROX 4800'-5000' AFTER EVERY CONNECTION. DRILL F/6440'-7433' & INCREASE MW TO 9.8 PPG W/GAS TO SURF F/APPROX 4800' TO 5000' AFTER EVERY CONNECTION. CIRC OUT GAS CUT MUD & INCREASE MW TO 10 PPG. DRILL 8.5" HOLE 9-5/8"@ 4166' MW:10.5 VIS: 53 CIRC OUT GAS CUT MUD & WT UP TO 10.3 PPG. CIRC AROUND 10.3 PPG MUD W/O ANY GAS. DRILL & MWD SURF 8.5" HOLE F/7433'-7992'. NO GAS CUT RETURNS. CBU FOR SHORT TRIP TO SHOE. SERV TOP DRIVE. MAKE 40 STD SHORT TRIP TO 9-5/8" SHOE. HOLE IN GOOD SHAPE. MONITOR HOLE @ SHOE, NO FLOW. RIH FILLING PIPE 20 STDS F/BTM. DRILL & SURV F/7992'-9605'. ON INITIAL BU FOLLOWING TRIP, SMALL AMT OF GAS TO SURF, CUTTING MUD TO 10 PPG. LD BHA 9-5/8"@ 4166' MW:10.6 VIS: 40 DRILL & MWD SURV 8.5" HOLE F/9605' TO 10140'. SERV RIG & TOP DRIVE. DRILL & SURV 8.5" HOLE F/10140'-10913'_ CIRC & COND MUD. MIX & PMP DRY JOB. POOH PAST COLVILLE SANDS TO 4631' 519-'3 RUN BACK IN HOLE TO 5193' TO CBU BELOW SANDS. CIRC · AT BU, SMALL AMT OF OIL & GAS IN MUD, CUTTING MW TO 10.1 PPG. CONT POOH TO CHANGE OUT BHA. DRILL 8.5" HOLE 9-5/8"@ 4166' MW:10.6 VIS: 42 CONT LD BHA. REMOVE RA SOURCE F/LWD TOOLS. BREAK DOWN TURBINE. PU NEW BIT & MU BHA. RELOAD RA SOURCE IN LWD TOOLS. RIH TO 9-5/8" SHOE & FILL PIPE. SLIP & CUT DRILL LINE_ SERV TOP DRIVE· RIH TO 10795' FILL PIPE & CIRC -- OUT GAS CUT MUD. REAM PIPE DOWN F/10810'-10913' WHILE LOGGING W/LWD. DRILL 8·5" HOLE F/10913'-11477' RECEIVED ^PR - 8 i9~ Aiaska Oil & Gas Cons. Corr~missio~, Anchorage WELL: 2A-20 API: 50-103-20196 PERMIT: 93-151 PAGE: 3 10/24/93 (8) PARKER 245 TD:11545' ( 68) 10/24/93 (10) DOWELL TD:11545 RIH W/7" CSG 9-5/8"@ 4166' MW:10.6 VIS: 44 DRILL 8.5" HOLE F/11477'-11545'. CIRC & COND MUD. MIX & PMP DRY JOB F/SHORT TRIP. SHORT TRIP TO 10900'. PULLED TIGHT THROUGH SANDS @ 11290' TO 11180', FORMATION SWABBINB WHIILE WORKING PIPE THROUGH SANDS. WASH 70' TO BTM W/O' FILL. CIRC & COND MUD F/7" CSG. GAS CUT MUD TO 9.8 PPG ON BTMS UP. DROP SURV. MIX & PMP SLUG. POOH TO 3630'. HOLE IN GOOD COND. REPAIR AIR LEAK IN HOSE TO TOP DRIVE. CONT POOH. RETRIEVE SURV, REMOVE SOURCE, LD 3 MONEL DC'S & ANADRILL TOOLS. PULL WEAR BUSHING. RU TO RUN 7" CSG & HOLD PREJOB SAFETY MEETING. RIH W/7" CSG & HOLD SAFETY MEETING. RIH W/7", 26#, L-80 CSG TO 5230'. FULL RETURNS ON PIPE DISPLACEMENT UNTIL OUT OF SHOE, LOST RETURNS @ APPROX 4600'. BREAK CIRC @ 5230'. ONLY HAD PARTIAL RETURNS, LOST TOTAL OF 70 BBLS. CONT RIH W/7" 26#, L-80 CSG. NO RETURNS. 9-5/8"@ 4166' DO ARCTIC PACK JOB. 10/25/93 (9) PARKER 245 TD:11545' ( 03/05/94 (11) NORDIC 1 TD:11545 PB:11439 o) RIG RELEASED 7"@11528' MW: 0.0 VIS: 0 CONT RIH W/7" 26# L-80 CSG W/NO RETURNS. RUN TOTAL OF 272 JTS & 1 MARKER PUTTING SHOE @ 11528'. MU CMT HEAD & CIRC @ 3 BPM, 1200 PSI, W/PARTIAL RETURNS. CIRC TOTAL OF 260 BBLS, LOST 230 BBLS. FLUSH CMT LINE W/25 BBLS FW & PRESS TEST TO 4000 PSI. PMP 20 BBLS PREFLUSH, DROP 1ST BTM PLUG & FOLLOW W/50 BBLS SPACER. DROP 2ND BTM PLUG & PMP 43.5 BBLS(200 SX) CLASS G CMT. DROP TOP PLUG & DISPLACE W/439 BBLS 10.6 PPG BRINE. BMP PLUG TO 3500 PSI & HOLD F/30 MIN. FLOATS HELD. CIP @ 1255 HRS. CHECK WELL FOR FLOW, NO FLOW. ND STACK & PU. SET SLIPS W/290 K ON WT INDICATOR. DROP 1" LINE DOWN 7" CSG & BLOW BRINE OUT DN 90' MAKE ROUGH CUT & FIN ND STACK & CSG TOOLS. MAKE FINAL CUT ON 7" STUB & DRESS SAME. INSTALL PACK-OFF & TREE, TEST SAME TO 3000 PSI FOR 15 MIN. LD 41 STDS OF DP OUT OF DERRICK FOR RIG MOVE. RELEASE RIG @ 2100 HRS 10/24/93. PERF A SAND 7"@11528' MW:10.6 NaCl/Br MOVE RIG 2A-19 TO 2A-20. ACCEPT RIG @ 1830 HRS 03/04/94. LEVEL RIG. PAD LOW AT WELL SITE. ND LOWER TREE. NU CAMERON BOP STACK. TEST BOP TO 3000 PSI. RU SCHLUMBERGER. PERF A SAND F/11178'-11216' W/4-1/2" HSD CSG GUNS @ 4 SPF WITH 180 DEG PHASING ORIENTED 19 DEG CCW. RD SCHLUMBERGER WL UNIT. RECEIVED WELL: 2A-20 API: 50-103-20196 PERMIT: 93-151 PAGE: 4 03/06/94 (12) NORDIC 1 TD:11545 PB:11439 RIG RELEASED 7"@11528' MW:10.6 NaCl/Br FIN LOADING PS W/TBG, STRAP & DRIFT. MU TP & BAKER FHL RETR PKR. RIH W/3-1/2" 9.3# L-80 EUE TBG. MU TBG HGR & LAND TBG. PRESS TBG TO 2500 PSI & SET PKR @ 11003'. BLEED TBG PRESS TO 1000 PSI-SHEAR PBR @ 18K OVER STRING WT. TEST ANN TO 2500 PSI-OK. TEST TBG TO 3000 PSI-SET BPV-SET BACK BOP. NU TREE. TEST PACK-OFF TO 5000 PSI-OK. CHANGE POSITION OF WING & SWAB VALVES ON TREE TO MEET ARCO SPEC. TEST TREE TO 5000 PSI-PULL TEST PLUG. DISPLACE ANN W/12 BBLS DIESEL & BULLHEAD 4 BBLS DIESEL DN TBG FOR FREEZE PROTECTION. SECURE WELL. RIG RELEASED @ 0330 HRS 03/06/94. SIGNATURE: DATE: RECEIVED UR!G!NP, L SUB. SURFACE DIRECTIONAL $URVEY F~UIDANCE [~ONTINUOUS ,~]OOL RECEIVED Company Well Name Field/Location ARCO ALASKA, INC. 2A-20 (696'FSL, 53'FEL, SEC.14, T11N, R8E,IM) KUPARUK, NORTH SLOPE~ ALASKA Job Reference NO. 93516 Log{3ed BT SARBER Date 11/4/93 Computed By; SINES . SCHLUlVlBEROER * GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA INC. 2A - 20 t""'~ITussI01t KUPARUK RIVER NORTH SLOPE, ALASKA SURVEY DATE: NOV-4-1993 METHODS OF COMPUTATION TOOL LOCATION INTERPOLATION VERTICAL SECTION ENGINEER- G. SARBER MINIMUM CURVATURE LINEAR HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 77 DEG $0 MIN WEST COMPUTATION DATE' lo-nov-93 PaGE ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' NOV-4-1993 KELLY BUSHING ELEVATION' 135.00 F-r ENGINEER' G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 900 O0 0 O0 -135 O0 99 199 299 399 499 599 699 797 895 99 -35 01 99 64 99 99 164 99 98 264 98 97 364 97 86 464 86 28 564 28 92 662 10 760 0 0 N 0 0 E 0 16 N 40 0 E 0 27 N 30 21E 0 35 N 29 50 E 0 37 N 3 25 W I 25 N 63 9 W 4 8 N 86 27 W 7 42 S 86 34 W 92 11 19 S 84 59 W 10 15 32 S 83 47 W 0. O0 -0 16 -0 57 -1 24 -1 77 -1 03 3 O9 13 46 29 59 52 93 0 O0 0 37 0 21 0 22 0 21 0 87 2 18 3 33 1 34 3 07 0 O0 N 0 17 N 0 62 N 1 44 N 2 35 N 3 52 N 4 32 N 4 10 N 2 92N 0 55 N 0 O0 E 0 13 E 045 E 0 96 E 1 31 E 0 30 E 4 09 W 14 65 W 30 90 W 54 26 W 0.00 N 0 0 E 0.21 N 37 24 E 0.77 N 35 42 E 1.73 N 33 5O E 2,69 N 29 3 E 3.53 N 4 5O E 5,95 N 43 25 W 15,22 N 74 22 W 31,04 N 84 36 W 54.26 N 89 25 W 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 990 86 O0 1085 O0 1179 O0 1272 O0 1363 O0 1453 O0 1540 O0 1623 OO 1703 O0 1778 855.86 17 46 54 950.54 19 27 46 1044.46 20 50 30 1137.30 22 53 58 1228.58 25 7 16 1318.16 27 46 27 1405,27 31 7 96 1488.96 35 26 44 1568.44 39 25 60 1643.60 42 57 S 83 41 W S82 2W S81 7W S 79 40W S 78 3O W S 77 10 W S 77 OW S 78 15 W S 77 40 W S 77 27 W 81 58 113 62 147 88 184 97 225 79 270 21 319 28 373 96 434 60 500 52 3 68 3 O6 2 18 1 77 1 86 2 16 2 65 3 19 3 65 3 9O 2 59 S 82.89 W 82.93 S 88 12 W 6 71S 114.78 W 114 98 S 86 39 W 11 72 S 148.75 W 149 17 85 S 185.37 W 186 25 64 S 225.45 W 226 35 06 S 268.86 W 271 46 14 S 316.66 W 320 57.88 S 370.07 W 374 70.38 S 429.41 W 435 84.66 S 493.77 W 500 21 S 85 30 W 23 S 84 30 W 90 S 83 31W 14 S 82 34 W O1 S 81 43 W 57 S 81 7 W 14 S 80 41W 97 S 80 16 W 2000.00 1850 03 1715 03 45 52 2100.00 1917 2200.00 1980 2300 O0 2038 24OO O0 2O93 2500 O0 2142 2600 O0 2187 2700 O0 2226 2800 O0 2263 2900 OO .2301 33 1782 44 1845 92 1903 14 1958 91 2007 19 2052 30 2091 71 2128 93 2166 33 49 17 44 52 19 92 55 34 14 58 29 91 61 49 19 65 24 3O 68 0 71 67 48 93 67 19 S 77 59 W 570 49 S 77 42 W 644 42 S 77 20 W 721 97 S 77 56 W 803 07 S 77 47 W 887 07 S 77 32 W 973 79 S 78 5 W 1063 43 S 78 53 W 1155.44 S 79 3 W 1248.16 S 78 54 W 1340.55 3 69 3 46 3 23 3 19 3 11 3 06 3 12 3 30 0 44 0 47 99 56 S 562 13 W 570 88 S 79 57 W 115 10 S 634 131 94 S 710 149 20 S 789 166 85 S 871 185 45 S 956 204 44 S 1043 222 85 S 1133 240.45 S 1225 258.12 S 1315 41W 644 11W 722 35 W 803 48 W 887 18 W 974 79 W 1063 95 W 1155 O0 W 1248 70 W 1340 77 S 79 43 W 27 S 79 28 W 32 S 79 18 W 31 S 79 10 W O0 S 79 1W 62 S 78 55 W 64 S 78 53 W 37 S 78 54 W 78 S 78 54 W 3000 O0 2340 79 2205 79 66 59 3100 3200 3300 3400 3500 3600 3700 3800 3900 O0 2380 O0 2420 O0 2459 O0 2498 O0 2536 O0 2571 O0 2608 O0 2645 O0 2684 58 2245 58 66 7 54 2285 54 67 12 09 2324 09 67 17 10 2363 10 66 47 16 2401 16 69 9 65 2436 65 68 57 18 2473 18 68 15 80 2510.80 67 24 98 2549.98 66 30 S 78 40 W 1432 68 S 78 53 W 1524 S 79 10 W 1616 S 79 10 W 1708 S 79 6 W 1800 S 79 6 W 1892 S 78 SO W 1986 S 78 30 W 2079 S 78 25 W 2172 S 78 19 W 2264 41 O6 3O 36 8O 27 35 O0 O0 0 48 0 58 0 74 0 75 0 69 0 94 1 04 1 15 0 94 0 84 276 02 S 1406 09 W 1432.92 S 78 54 W 294 311 328 346 363 381 399 418 437 03 S 1496 04 W 1524.66 S 78 53 W 51 S 1586 03 W 1616.33 S 78 53 W 82 S 1676 66 W 1708.60 S 78 54 W 20 S 1767 08 W 1800.67 S 78 55 W 70 S 1857 87 W 1893.14 S 78 55 W 55 S 1949 65 W 1986.63 S 78 56 W 92 S 2040.90 W 2079.72 S 78 55 W 48 S 2131.68 W 2172.36 S 78 54 W 03 S 2221.79 W 2264.37 S 78 52 W COMPUTATION DATE' lO-NOV-93 PAGE 2 ArCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' NOV-4-1993 KELLY BUSHING ELEVATION' 135.00 ET ENGINEER' O. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG VERTICAL DOGLEG' RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH FEET DEG/IOO FEET FEET FEET DEG 4000 O0 2725 26 2590.26 65 59 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 2766 O0 2809 O0 2851 O0 2895 O0 2938 O0 2982 O0 3026 O0 3070 O0 3113 53 2631 53 65 17 O1 2674 83 2716 33 2760 97 2803 74 2847 98 2891 57 2935 50 2978 01 64 38 83 64 16 33 64 11 97 64 5 74 63 52 98 63 41 57 64 35 50 64 32 S 78 11W 2355 52 S 78 4 W 2446 61 S 77 23 W 2537 13 S 77 12 W 2627 50 S 77 3 W 2717 53 S 77 6 W 2807 50 S 76 59 W 2897 40 S 77 23 W 2987.08 S 78 23 W 3077.07 S 78 26 W 3167.39 0 78 0 78 0 78 0 71 0 63 0 40 0 27 0 45 0 73 0 68 455 67 S 2311 40 W 2355 89 S 78 51 W 474 493 513 533 553 573 594 612 63O 44 S 2400 62 S 2489 52 S 2577 62 S 2664 77 S 2752 94 S 2840 07 S 2927 71S 3015 85 S 3104 53 W 2446 O0 W 2537 15 W 2627 92 W 2717 61W 2807 23 W 2897 63 W 2987 67 W 3077 15 W 3167 97 S 78 49 W 48 S 78 47 W 82 S 78 44 W 82 S 78 41W 76 S 78 38 W 64 S 78 35 W 29 S 78 32 W 29 S78 31W 60 S 78 31W 5000 O0 3155.24 3020.24 65 52 5100 5200 5300 5400 5500 5600 5700 5800 5900 O0 3196.39 3061.39 65 21 O0 3238.37 3103.37 64 52 O0 3281.27 3146.27 64 20 O0 3324.45 3189.45 64 58 O0 3365.44 3230.44 66 5 O0 3406.46 3271.46 65 29 O0 3448.45 3313.45 64 52 O0 3490.17 3355.17 66 17 O0 3529.71 3394.71 66 37 $ 78 30 W 3258.25 S 78 26 W 3349 38 S 78 14 W 344O S 78 4 W 3530 S 77 57 W 3620 S 77 32 W 3711 S 77 23 W 38O3 S 77 6 W 3893 S 77 19 W 3984 S 77 19 W 4076 14 47 67 88 07 82 70 54 0 90 0 75 0 77 0 60 0 63 0 93 0 96 0 74 0 82 0 96 649.06 S 3193 17 W 3258 47 S 78 31 W 667.31S 3282 685.72 S 3371 704.28 S 3459 723.00 S 3547 742.43 S 3637 762.2I S 3726 782.27 S 3814 802.46 S 3903 822.62 S 3992 47 W 3349 34 W 3440 75 W 353O 98 W 362O og W 3712 12 W 3803 63 W 3894 24 W 3984 85 W 4076 61 S 78 31W 37 S 78 30 W 70 S 78 30 W 89 S 78 29 W 09 S 78 28 W 28 S 78 26 W 02 S 78 25 W 88 S 78 23 W 71 S 78 22 W 6000 O0 3570 03 3435 03 65 50 6100 6200 6300 6400 6500 6600 6700 6800 6900 O0 3609 O0 3648 O0 3688 O0 3728 O0 3770 O0 3810 O0 3849 O0 3889 O0 3929 96 3474 63 3513 09 3553 81 3593 42 3635 35 3675 56 3714 59 3754 95 3794 96 67 16 63 67 5 09 66 25 81 65 38 42 65 31 35 67 8 56 66 39 59 66 10 95 66 48 S 77 13 W 4168 05 S 77 46 W 4259 S 77 34 W 4351 S 77 24 W 4443 S 77 6 W 4535 S 76 57 W 4626 S 77 30 W 4717 S 77 11W 4809 S 76 38 W 4901 S 76 26 W 4992 72 94 83 15 08 75 74 36 82 1 05 0 92 0 97 0 45 0 66 0 70 1 05 0 95 0 83 0 85 842 79 S 4082.11 W 4168 20 S 78 20 W 862 882 902 922 942 963 983 1004 1025 63 S 4171.61 W 4259 32 S 4261.71 W 4352 27 S 4351.40 W 4443 46 S 4440,48 W 4535 91 S 4529.08 W 4626 20 S 4618.48 W 4717 30 S 4708.25 W 4809 04 S 4797.51W 4901 54 S 4886.44 W 4992 87 S 78 19 W 09 S 78 18 W 96 S 78 17 W 28 S 78 16 W 19 S 78 14 W 85 S 78 13 W 83 S 78 12 'W 45 S 78 11W 90 S 78 9 W 7000 O0 3968.02 3833 02 67 57 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 4006.07 3871 O0 4045.42 3910 O0 4085 15 3950 O0 4122 74 3987 O0 4160 89 4025 O0 4199 78 4064 O0 4238 72 4103 O0 4276 84 4141 O0 4314 62 4179 07 67 20 42 66 21 15 67 38 74 67 47 89 67 25 78 66 43 72 67 41 84 67 22 62 67 46 S 75 49 W 5085 25 S 75 13 W 5177 S 74 19 W 5269 S 76 5 W 5361 S 75 48 W 5453 S 75 32 W 5546 S 75 12 W 5638 S 77 25 W 5730 S 77 32 W 5822 S 79 12 W 5915 65 45 08 70 07 11 18 62 19 1 22 1 1 1 1 1 0 1 0 0 1047 65 S 4976 22 W 5085 31 S 78 7 W 25 1070 O7. 1094 45 1118 55 1141 31 1164 66 1187 37 1209 42 1229 95 1247 80 S 5065 98 S 5154 94 S 5243 28 S 5332 19 S 5422 57 S 5511 37 $ 5601 40 S 5691 41S 5782 75 W 5177 45 W 5269 O2 W 5361 96 W 5453 51W 5546 62 W 5638 10 W 5730 35 W 5822 17 W 5915 69 S 78 4 W 47 S 78 0 W 09 S 77 57 W 71 S 77 55 W 08 S 77 53 W 11 S 77 50 W 18 S 77 49 W 62 S 77 49 W 19 S 77 50 W COMPUTATION DATE' lO-NOV-93 PAGE 3 ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' NOV-4-1993 KELLY BUSHING ELEVATION' 135,00 FT ENGINEER' G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 8000 O0 4352 67 4217 67 67 27 8100 8200 8300 8400 8500 8600 8700 8800 8900 O0 4391 O0 4430 O0 4470 O0 4511 O0 4552 O0 4590 O0 4628 O0 4666 O0 4705 18 4256 48 4295 61 4335 71 4376 56 4417 35 4455 26 4493 50 4531 48 4570 18 67 8 48 66 38 61 66 4 71 65 31 56 67 4 35 67 5O 26 67 35 50 67 10 48 67 11 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN S 78 51W 6007 65 S 78 25 W 6099 S 78 13 W 6191 S 77 57 W 6283 S 77 49 W 6374 S 76 14 W 6465 S 74 43 W 6558 S 74 17 W 6650 S 73 53 W 6742 S 74 33 W 6834 93 88 47 63 9O 38 76 96 85 I O0 0 72 0 52 0 57 0 59 1 O1 I 54 1 53 0 99 0 64 1265 02 S 5872 96 W 6007 65 S 77 51 W 1283 1301 1320 1339 1360 1383 1408 1433 1459 22 S 5963 89 S 6053 82 S 6143 97 S 6232 09 S 6321 73 S 6410 47 S 6499 87 S 6588 11S 6677 43 W 6099 47 W 6191 08 W 6283 21W 6374 24 W 6465 75 W 6558 91W 6650 76 W 6742 31W 6834 93 S 77 51W 88 S 77 52 W 47 S 77 52 W 64 S 77 52 W 90 S 77 51W 38 S 77 49 W 76 S 77 46 W 97 S 77 43 W 88 S 77 40 W 9000 O0 4745.00 4610 O0 66 10 9100 9200 9300 9400 9500 9600 9700 9800 9900 O0 4785.90 4650 O0 4827.18 4692 O0 4868.19 4733 O0 4910.35 4775 O0 4950.73 4815 O0 4990.51 4855 O0 5029.23 4894 O0 5067.89 4932 O0 5109.13 4974 90 65 35 18 65 58 19 65 21 35 65 13 73 66 32 51 66 39 23 67 25 89 67 4 13 64 46 S 73 56 W 6926 53 S 73 45 W 7017 S 75 5 W 7108 S 75 19 W 7199 S 75 21W 729O S 76 19 W 7381 S 76 22 W 7473 S 76 46 W 7565 S 76 27 W 7657 S 74 13 i 7748 56 47 57 16 60 31 49 69 67 0 90 0 95 1 07 0 89 0 93 0 72 0 63 0 81 0 53 I 84 1483 98 S 6765.74 W 6926 58 S 77 38 W 1509 1533 1557 1580 1602 1624 1645 1666 1690 39 S 6853 38 W 7017 96 S 6941 25 S 7029 34 S 7116 43 S 7205 10 S 7294 36 S 7384 69 S 7474 16 S 7562 09 W 7108 26 W 7199 95 W 7290 73 W 7381 88 W 7473 59 W 7565 32 W 7657 32 W 7748 63 S 77 35 W 57 S 77 32 W 69 S 77 31W 30 S 77 29 W 76 S 77 28 W 49 S 77 27 W 67 S 77 26 W 89 S 77 26 W 89 S 77 24 W 10000.00 5154 63 5019 63 61 46 10100.00 5203 10200.00 5255 10300 O0 5310 10400 O0 5369 10500 O0 5431 10600 O0 5495 10700 O0 5564 10800 O0 5634 10900 O0 5708 62 5068 62 59 48 44 5120 44 57 54 60 5175 60 55 5 55 5234 55 52 44 11 5296 11 51 12 87 5360.87 47 52 04 5429.04 46 12 63 5499.63 43 42 43 5573.43 41 8 S 74 36 W 7837 55 S 75 20 W 7924 S 74 55 W 8010 S 73 22 W 8093 S 73 22 W 8173 S 73 19 W 8252 S 74 16 W 8328 S 75 16 W 8401 S 73 23 W 8472 S 73 44 W 8539 61 03 25 76 33 30 35 04 29 2 51 2 91 2 31 2 23 2 33 2 23 2 37 2 22 2 58 2 71 1713.93 S 7648 12 W 7837.81 S 77 22 W 1736.48 S 7732 I758.46 S 7814 ~781:26 S 7895 1804.39 S 7972 1826.85 S 8048 1848.33 S 8121 1867.53 S 8191 1886.42 S 8260 1905.88 S 8324 33 W 7924.91 S 77 21 W 97 W 8010.36 S 77 19 W 18 W 8093 63 S 77 17 W 56 W 8174 20 S 77 15 W 10 W 8252 83 S 77 13 W 18 W 8328 86 S 77 11W 77 W 8401 95 S 77 9 W O1 W 8472 68 S 77 8 W 61 W 8539 99 S 77 6 W 11000.00 5783.33 5648.33 42 3 11100 O0 5856.91 5721.91 43 14 11200 O0 5929.32 5794.32 43 47 11300 O0 6001.66 5866.66 43 24 11400 O0 6074.01 5939.01 44 1 11500 O0 6145.93 6010.93 44 1 11545 O0 6178.29 6043.29 44 1 S 77 33 W 8605.48 S 81 51W 8673.13 S 82 33 W 8741.88 S 83 36 W 8810.65 S 86 13 W 8879.01 S 86 13 W 8947.76 S 86 13 W 8978.70 RECEIVED 2.61 2.91 2.38 0.81 O. O0 O. O0 0.00 1922 37 S 8388 76 W 8606 21 S 77 6 W 1934 38 S 8455 38 W 8673 83 S 77 7 W 1943 58 S 8523 73 W 8742 51 S 77 9 W 1952 09 S 8592 24 W 8811 20 S 77 12 W 1958 04 S 8660 89 W 8879 47 S 77 16 W 1962 64 S 8730 22 W 8948 12 S 77 20 W 1964 71 S 8761 42 W 8979 O1 S 77 22 W ..~; :t',,~ u~i & Gas Cons. Commission Anchorage COMPUTATION DATE: lO-NOV-93 PAGE 4 ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: NOV-4-1993 KELLY BUSHING ELEVATION: 135.00 FT ENGTNEER: G. SARBER INTERPOLATED VALUES FOR EVEN 10OO FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 1000 2000 3000 4o0o 5000 6000 7000 8000 9000 0 O0 -135 O0 O0 990 O0 1850 oo 2340 oo 2725 O0 3155 O0 3570 O0 3968 O0 4352 O0 4745 0 0 86 855 03 1715 79 2205 26 2590 24 3020 03 3435 02 3833 67 4217 O0 4610 86 17 46 O3 45 52 79 66 59 26 65 59 24 65 52 03 65 50 02 67 57 67 67 27 O0 66 10 N 0 0 E S 83 41W 81 S 77 59 W 57O S 78 40 W 1432 S 78 11W 2355 S 78 30 W 3258 S 77 13 W 4168 S 75 49 W 5086 S 78 51W 6007 S 73 56 W 6926 0 O0 58 49 68 52 25 O5 25 65 53 0 O0 3 68 3 69 0 48 0 78 0 9O 1 O5 1 22 1 O0 0 9O 0 O0 N 2 99 276 455 649 842 1047 1265 1483 0 O0 E 59 S 82 56 S 562 02 S 1406 67 S 2311 06 S 3193 79 S 4082 65 S 4976 02 S 5872 98 S 6765 0 O0 N 0 0 E 89 W 82 13 W 570 O9 W 1432 40 W 2355 17 W 3258 11W 4168 22 W 5085 96 W 6007 74 W 6926 93 S 88 12 W 88 S 79 57 W 92 S 78 54 W 89 S 78 51W 47 S 78 31W 20 S 78 20 W 31 S 78 7 W 65 S 77 51W 58 S 77 38 W 10000.00 5154.63 5019.63 61 46 11000.00 5783.33 5648.33 42 3 11545.00 6178.29 6043.29 44 S 74 36 W 7837.55 S 77 33 W 8605.48 S 86 13 W 8978.70 2.51 2.61 0. O0 1713.93 S 7648.12 W 7837.81 S 77 22 W 1922.37 S 8388.76 W 8606.21 S 77 6 W 1964.71S 8761.42 W 8979.01 S 77 22 W RECEIVED ~-:,, l- , -,, L) .i ..,.,~.~,~ u~i & Gas Cons. Commissiort Anchorage COMPUTATION DATE' lO-NOV-93 PAGE 5 ARCO ALASKA INC. 2a - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY- NOV-4-1993 KELLY BUSHING ELEVATION' 135.00 FT ENGINEER' G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 135 O1 235 O1 335 02 435 02 535 05 635 27 736 10 837 93 941 54 0 O0 -135 O0 135 235 335 435 535 635 735 835 935 O0 0 O0 O0 100 O0 O0 2OO O0 O0 300 O0 O0 400 O0 O0 5O0 O0 O0 600 O0 O0 700 O0 800 0 0 N 0 0 E 0 18 N 39 24 E 0 33 N 34 14 E 0 34 N 27 27 E 0 48 N 29 33 W 2 9 N 75 33 W 5 34 N 89 49 W 8 49 S 86 13 W O0 13 2 S 84 21W O0 16 37 S 83 45 W 0. O0 -0.3O -0.79 -1.47 -1.74 -0.09 5.98 18'. 59 37.53 64.43 0. O0 0.21 0.20 0 19 0 43 I 26 2 75 3 51 I 99 3 49 O00N 0 30N 0 88N 1 74 N 275N 388N 441 N 378N 2 19 N 071 S 0.00 E 0 24 E 0 61 E 1 13 E 1 19 E 0 75W 7 07W 19 83 W 38 86 W 65 76 W 0 O0 N 0 0 E 0 1 2 3 3 20 38 65 38 N 38 37 E 07 N 34 55 E 08 N 33 ! E O0 N 23 25 E 95 N 10 55 W 33 N 58 2 W 19 N 79 13 W 92 N 86 47 W 76 S 89 23 W 1046 50 1035 O0 1152 1259 1368 1479 1593 1713 1841 1978 2127 900.00 18 46 54 1135 66 1235 51 1335 57 1435 85 1535 63 1635 33 1735 53 1835 27 1935 O0 1000.00 20 5 O0 1100.00 21 55 O0 1200 O0 24 28 O0 1300 O0 27 13 O0 1400 O0 30 52 O0 1500 O0 35 52 O0 1600 O0 41 0 O0 1700 O0 45 24 O0 1800 O0 50 4 S 82 40 W S 81 39 W S 80 31W S 78 50 W S 77 21W S 76 59 W S 78 19 W S 77 29 W S 77 53 W S 77 34 W 96.12 131 31 169 62 212 58 260 85 316 381 461 555 665 11 95 27 15 19 3 42' 2 54 1 85 1 85 2 O7 2 59 3 25 3 79 3.74 3.39 4 35 S 9 15 23 33 45 59 76 96 119 97 39 W 22 S 132 21S 170 04 S 212 O0 S 259 42 S 313 49 S 377 13 S 455 35 S 547 54 S 654 97 49 S 87 27 W 33 W 132 24 W 170 49 W 213 73 W 261 58 W 316 90 W 382 45 W 461 13 W 555 69 W 665 66 S 86 1W 92 S 84 54 W 74 S 83 49 W 82 S 82 46 W 85 S 81 45 W 55 S 81 3 W 77 S 80 31W 55 S 80 1W 52 S 79 39 W 2293 08 2035.00 1900 O0 55 23 2483 2723 2985 3237 3496 3771 4023 426O 4490 55 2135 O0 2000 26 2235 15 2335 47 2435 72 2535 71 2635 88 2735 86 2835 90 2935 O0 2100 O0 2200 O0 2300 00-2400 O0 2500 O0 2600 O0 2700 O0 2800 O0 61 17 O0 68 12 O0 67 3 O0 67 23 O0 69 7 O0 67 46 O0 65 48 O0 64 45 O0 64 4 S 77 54 W S 77 32 W 959 S 79 5 W 1177 S 78 43 W 1419 S 79 13 W 1650 S 79 7 W 1889 S 78 26 W 2145 S 78 9 W 2377 S 77 16 W 2592 S 77 6 W 2799 797 37 37 O1 O1 61 73 86 33 16 32 3 21 3 O7 3 20 0 48 0 8O 0 93 1 11 0 78 0 69 0.43 148 O1S 783.78 W 797 63 S 79 18 W 182 226 273 317 363 413 460 5O5 551 33 S 942 10 W 959 99 S 1155 35 S 1392 99 S 1619 12 S 1854 23 S 2106 15 S 2332 71S 2542 94 S 2744 11W 1177 68 W 1419 98 W 1650 86 W 1890 07 W 2146 74 W 2377 69 W 2592 64 W 2799 59 S 79 3 W 21 S 78 53 W 25 S 78 54 W 89 S 78 54 W 07 S 78 55 W 22 S 78 54 W 69 S 78 50 W 49 S 78 45 W 58 S 78 38 W 4718 15 3035 O0 2900 O0 63 51 4950 5192 5425 5668 5913 6164 6414 6663 82 3135 05 3235 22 3335 23 3435 31 3535 89 3635 95 3735 12 3835 6912.87 3935 O0 3000 O0 3100 O0 3200 O0 3300 O0 3400 O0 3500 O0 3600 O0 3700 O0 3800 O0 65 26 O0 64 57 O0 65 34 O0 65 2 O0 66 32 O0 67 14 O0 65 31 O0 66 51 O0 67 6 S 77 43 W 3003 35 S 78 27 W 3213 S 78 14 W 3432 S 77 49 W 3643 S 77 11W 3865 S 77 18 W 4088 S 77 39 W 4319 S 77 5 W 4548 S 77 21W 4775 S 76 25 W 5004 43 94 57 04 76 58 76 85 66 0 49 0 84 0 78 0 78 0 9o 0 96 1 O0 0 67 0 94 0 96 597 57 S 2943 52 W 3003 57 S 78 31 W 640 684 727 775 825 875 925 975 1028 09 S 3149 26 S 3364 81S 3570 86 S 3786 30 S 4004 37 S 4230 50 S 4453 83 S 4675 32 S 4897 26 W 3213 29 W 3433 37 W 3643 57 W 3865 77 W 4088 10 W 4319 74 W 4548 20 W 4775 94 W 5004 65 S 78 31W 17 S 78 30 W 80 S 78 29 W 24 S 78 25 W 93 S 78 21W 73 S 78 18 W 89 S 78 16 W 95 S 78 13 W 73 S 78 9 W COMPUTATION DATE: lO-NOV-93 PAGE 6 ARCO ALASKA INC. 2a - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: NOV-4-1993 KELLY BUSHING ELEVATION: 135.00 ET ENGINEER: G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG BIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 7173 90 4035 O0 3900.00 66 36 7432 7690 7953 8211 8456 8717 8975 9219 9460 33 4135 2O 4235 71 4335 39 4435 29 4535 70 4635 13 4735 18 4835 46 4935 O0 4000 O0 67 38 O0 4100 O0 4200 O0 4300 O0 4400 O0 4500 O0 4600 O0 4700 O0 4800 O0 67 37 O0 67 40 O0 66 37 O0 65 46 O0 67 37 O0 66 27 O0 65 59 O0 66 35 S 74 33 W 5245 56 S 75 40 W 5483 59 S 77 21W 5721 I1 S 79 2 W 5964 87 S 78 13 W 6202 S 77 19 W 6425 S 74 13 W 6667 S 74 5 W 69O3 S 75 ll W 7125 S 76 19 W 7345 33 88 O9 81 96 34 I 15 1 45 I 33 0 99 0 52 0 65 1 54 0 78 I O8 0 65 1088 55 S 5131 40 W 5245 59 S 78 1 W 1148 1207 1256 1304 1350 1412 1477 1538 1593 65 S 5361 40 S 5592 81S 5830 02 S 6063 96 S 6282 92 S 6515 70 S 6743 46 S 6958 85 S 7170 94 W 5483 25 W 5721 96 W 5964 7O W 62O2 26 W 6425 66 W 6667 86 W 6903 O1W 7126 49 W 7345 60 S 77 55 W 11 S 77 49 W 87 S 77 50 W 33 S 77 52 W 88 S 77 52 W 09 S 77 46 W 85 S 77 38 W 06 S 77 32 W 49 S 77 28 W 9715 O0 5035 O0 4900.00 67 21 9958 10161 10342 10506 10657 10800 10935 11070 11207 24 5135 23 5235 12 5335 17 5435 79 5535 51 5635 31 5735 03 5835 86 5935 O0 5000,00 62 8 O0 5100.00 58 30 O0 5200.00 54 3 O0 5300.00 51 5 O0 5400.00 46 54 O0 5500.00 43 42 O0 5600.00 41 13 O0 5700.00 42 52 O0 5800.00 43 47 S 76 45 W 7579.34 S 74 43 W 7800.75 S 75 3 W 7977.13 S 73 22 W 8127.47 S 73 19 W 8257.11 S 74 53 W 8370.75 S 73 23 W 8472.39 S 74 54 W 8562.49 S 80 47 W 8652.71 S 82 35 W 8747.30 0 75 2 19' 1704 2 34 1749 2 31 1791 2 23 1828 2 31 1859 2 58 1886 2 52 1912 2 88 1931 2 32 1944 1648 53 S 7398 07 W 7579.52 S 77 26 W 17 S 7612 92 S 7783 09 S 7928 22 S 8052 66 S 8162 52 S 826O 15 S 8346 26 S 8435 28 S 8529 59 W 7801.00 S 77 23 W 15 W 7977.45 S 77 20 W 07 W 8127.87 S 77 16 W 68 W 8257 61 S 77 13 W 16 W 8371 33 S 77 10 W 35 W 8473 03 S 77 8 W 99 W 8563 21 S 77 6 W 17 W 8653 43 S 77 6 W 12 W 8747 92 S 77 10 W 11345.92 6035.00 5900.00 43 34 11484.81 6135.00 6000.00 44 1 11545.00 6178.29 6043.29 44 1 S 84 49 W 8842.04 S 86 13 W 8937.32 S 86 13 W 8978.70 O. 97 0. O0 0. O0 1955.30 S 8623.66 W 8842.55 S 77 13 W 1961.94 S 8719.69 W 8937.68 S 77 19 W 1964.71S 8761.42 W 8979.01 S 77 22 W RECEIVED ,,:.~ :,.i:~: oil & Gas Cons. Coriqlfl[ssio~ AI~chorage ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA MARKER 9 5/8" CASINO OCT LAST READING PBTD 7" CASING TD COMPUTATION DATE' lO-NOV-93 PaGE 7 DATE OF SURVEY' NOV-4-1993 KELLY BUSHING ELEVATION' 135.00 FT ENGINEER' G. SARBER INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 696' FSL, 53' FEL,, SECl4 TllN R8E MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 4167.00 11390.00 11439.00 11528.00 11545.00 2794.84 2659.84 6066.82 5931.82 6102.06 5967.06 6166.06 6031.06 6178.29 6043.29 487.16 S 2459.91 W 1957.70 S 8654.06 W 1959.84 S 8687.93 W 1963.93 S 8749.64 W 1964.7! S 8761.42 W RECEIVED Anchorage ArCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA MARKER COMPUTATION DATE' lO-NOV-g3 STRATIGRAPHIC SUN~ARY ************ MEASURED DEPTH BELOW KB DATE OF SURVEY' KELLY BUSHING ELEVATION' ENGINEER' 11545.00 PAGE 8 NOV-4-1993 135.00 [UT G. SARBER SURFACE LOCATION = 696' FSL, 53' FEE,, SEC14 TllN R8E TVD RECTANGULAR COORDINATES FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 6178.29 6043.29 1964.71S 8761.42 W FINAL WELL LOCATION AT -rD' 'rRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 11545.00 6178.29 6043.29 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 8979.01 S 77 22 W DIRECTIONAL SURVEY COMPANY FIELD ARCO ALASKA INC. KUPARUK RIVER WELL 2A - 20 COUNTRY USA RUN I DATE LOGGED 4 - NOV DEPTH UNIT FEET - 19 REFERENCE 93516 Anchorage guarantee the accuracy or correctness of any interpretations, and we shall not, except in the case of gross or wilfull All Interpretations are opinions based on inferences from electrical or other measurements and we cannot, and do not negligence on our part. be liable or responsible for any lose. costs, damages or expenses incurred or sustained by anyone resulting from any Interpretation made by any of our officem, agent~ or employees. These Interpretatlon~ are also subject to our General Terms and Conditions as sat out in our current price Schedule. .LL: 2A-20 ,696'FSL, 53'FEL, SEC.14, Tl1' ~R8E, UR) ..... ~RZZONTAL PROJECTION 8000 REF 9351e 6OOO 4OOO 2OOO -40OO -60OO SOUTH -8000 -12000 WEST SCAL~ = I / 2000 IN/FT !';!''~ .... ~"Y":"~ ...... !'"F"!"'~'"F":"'['"!'I"';"'!":~ ..... !"?":'"; .... !'"!'F"~ !"'~"!'! .... :"!'"?'~'!'"!"!'": ..... :"!"';'! ;';'!'~" ;'; .......... ::; :::: ::;: ::::1:;:: ;::: ;_::: :::: '::: :.: ..:: ;::.; .... . ! i i. !-i.i..!. !..! i.i i i..i i -!.,.i i i i.i i.! .i.i..i i. i.i.i ~ ...i i !..i. !.! ! ! i i ! ! i.i.i ~ : i !.i ~ . ; ~ ~ ~ i i ;-.i ; i-i-J, i i i i .i i i i. i i i i i..i i..i i -i i.i.;.! ;.;..; i ; i i ; ; ~ i i i.i i ~ · i ........ :...i..i: .... ;...:...: ......... :...:..:...: ..... i...:...:..~..:.~:..;...: ..... ::...:.: .... :..:: .... :...:...;...:..:.;.: ...... ;..:..:.: :...;..:...: .... ;..;...:..; .... :..: .... -:' i:: ::~ i:;: i;~'i~! ~:ii i~i~ii~ ~i~' :: ~ :: : .:;: ~:!' .i~! :;:! :i:! iii. ;:'' !:!~ :.!~ :ii; !: .::: ::: i i i ! '; ;';-, i--; ; ~- -;--~'-i ;- 'i !-!-} ;-~ ; ; 'i i ! i !'i ! !- -} ! } ! ! : i ! i i ! i- ! ! ~ i : : ; ' ;!: : ::::i! i!i !:!! i.: : : · . : :. :.:: .:I ...... r ::-- . . . : ....... , ~.;.i -}.i i i.-i }-i i ..: ; i...; ,-.}..; i- ..i.i.~.-i... ~--.¢.. ,--..i.-, ,~ ..... ~ ,...i..i- .i., · + .... ,., :. -i-,-.~ ~ .... i , - ~ , : : i :. ;--i--.i---i ~i---i i :-- , ,.i-i-. ; i.i-.i .~.i-: ~. -:~;---, .... i-.i.-; ;. ~ : ,.! : :.i i ..... :..:-.; i ..i i..; ~ ~ ~ ; . i --!i :!i' .-. - :- ':!: ::i! .i'' ::' :i-- :: :::' iii' ': '""~ : : ~ . ~ · i . i i : : i ~ ......... ~ . : : i ......... : ~ . ~ · : .... I .... i, .. . :::: -:.: :: : :~.: :: :: :.:: · ..:i :i i : ,.ii..i ..... ,...,.../.../...:,.:.ii .... :.,..., ....... i...;.,...i .h.;...,..., .... i...ii...; ...... i.,...i..., .... h..h..i..:..,..:...;..} i...i~,..., .... ,..,...,..., ......... , .... , ...... :: ~.~ :~ ::~: ~::: ~:. :: : .:~: :::~ !i.L.! ..... i...iil .... .... .... i..i.i..i ...... i..:!!...i...L!zx:...i..il ..... .... "i , :~;:'ii ;,:~!;,;i;~ :i~. i::i !::: !~;: :~i: :::' ii. i.i 2.L~:~:)O ~"!"'!-'i ...... 7'i'"7'i ...... i'"!"T": .... !"':"7'! ...... !"i-7"7'."!"T"!'"i'"i'T'T"!'"'."!~ ~:.'i'"!'T"!"'i .... i .... i ...... 7'7'i"! .... F'i'"i ........... I ..... I . ~ : .... .: : : :: ~ : -:: :~ : : :: :. . . -- , . . .. : .: ::.: :- . :.:: :.:: -;. ..: .:. : ,. ........ : .::: :::: :::: :::. :::: . : : : ...... i---i---¢--.¢ ...... ...... .... i---!--i.--i ..... i---i--i.i---ii¢--! ;';!'i";:"'!:i':i::"':'i":': .... ! i i ! i i'i-!"! ...... i"'F!'F' i i'ii i !'i i i i ; ! ; i : ! : : i ' ' ' · : . . : : : . ~..i i ~ .! } ;...i. -i-i-i }..i i ~-~ ~.}.i i .: i i i :~i i ; i ~ } } ~: ; :. , : ; : - · ~ : i i ! : : : !i. i~::~!~ ~: ~;:il ~:~ ~:~: ;:: ;~ : :':: ; i;.. ; ' i : i ; f"~ !"i'"1 i"i'"i'~ .... i'i ....... i i ''= i'"i'i'"!" ','i'z'i '"!", :'~' "?! ;' !'"i ' i ....... ' ; , , , , , ._ ~ ............. -10000 -8000 -6000 -4000 -2000 0 2000 RECEIVED 4OO0 ~$T _LL: 2A-~2~ ~ ,696'FSL, 53'FEL, SEC.14, TI:~'-~'~RSE, tiN) VERTICAL PROJECTION -4000 -2000 0 0 2000 4000 6000 8000 10000 12000 ( : ;;,~.;;.;..~-;:~.,!...!!: ~.. ~=:o~..~ !ii' i!:! :ii ii:. !~!~. !:.. ::~'':::! :!~' i:!: ?~:"~-~'i'~' "~'-~i .... :i"'i"i '~'"~'"~'"~ ...... i"i'~i i'?'i"! ":"~"i"i .... i'?'i'"i' i"i?~:.:"!eooo'"i'"i"':"i .... i:'i'i' :'::: : '! ' '' '"!"':"!!"~"! .... ~" ....... !'"~"!"~'"!'"!':"i'"~'"~"!'"~""'!"'~'"!"! .... :'-'k-:'"~ ..... ~'"!'-'~"~ ..... :"'~'"i'"~ ..... ~'"i'"~"!'~'~':'j'"i"'i ": ................. :":":": .......... !ii::ii::i::i:i::L ..... ....... ..... ...... ........ !-.i-i-l-~--i-!-! i.!.-ii .... !ii-.-i i-ii-i- -i-ii-! ---i-i!!..-ii---i.! -.-!-.~i-~..~.: ..... ::-: ...... y i i 7 ! i'~ :'": ' : :~ '; ;'; [';'; "; :" :': ":':" ": :' ..... "'"' '"': '"'""" .......... ' ......... :::~ -!-i--i-i :-: ..... !~-~ 'i-'i"!'i~ '!'-'!'"i'!" i"!"~'i '~:!'i' i!"!': ...... i'~i"-i ...... i,..~ ........ !--.! I .... [ .... ~ : : ~ 8000 ~ } i ! ..~ !--:-! ~ · ! ! : ;-la, J '!"! i-"!' } ~"i ! ~ } ~ ~ '} } i ~ -} i i'!' i !', ~- 'i : . i.} ! ii, - ..... : .... ~ :::. :::: ... ::.: :..: . . : · :: :.. . [, ~ ~.,..~ ~ ~.:. : ~ ~ ~ ..; ~.~ ~..~...~ ~.[ ~..~...~ .~.~ ~ ~ .... ~..~ ~.~ ~ ~ : ~ ~ : ~.~. ~ ~ . ~ .~.~ ~.~ ..: ~ ~ ......... -~:--.~- ::.--~--: .... ~.~: .... ~.~.-~-~--~-~--~-~--~.-:--.~--.~-~.~. [-..~..~-~ .... ~ .... ~ :-. : .~:.:-. :~- I . . . ...... .:.~...~: ~.~.~.~ ~-~.;...:.;..~..~. ~..~-~..~-.~..-~.~.~. ~.~...~.~ ::-. .~.:...~...} .... }...~..r...} ....... }...~...~...~...~...~...~.:. .:...~...: ...... :.~..:._~..,.~...:.~...: .... } ...... : ..... : ..... :...: ..... ~ :.L .L.L[.~ ........ L..L..L..L..~.[..~. [ ~..L~ [ [ L LI.L.~ ~ [ .[ L..[ [ .~ : [.[ :.: [.L .[ : ......... =~.~ ;.[.~;..~::.~.~.~..~j.~ .[.j.[...~. 258.00 © &. ~a:~ (.;otis. rJommissior. Anchorage SUB.$URFACE DIRECTIONAL $URVEY I'~UIDANCE [~ONTINUOUS ~IOOL Company Well Name Field/Location ARCO ALASKA, [NC. _ 2A-20 ~696'FSL, 53'FEL, SEC.14, T11N, R8E,IM;~ . KUPARUK~ NORTH SLOPE~ ALASKA . Job Reference NO; 93516 Log(3ed By:. SARBER Date ]1/4/93 Computed By.' SINES ~ SCHLI~BEROER ~ GCT DIRECTIONAL SURVEY CUSTOMER LISTIN% , FOR ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA SURVEY DATE' NOV-4-1993 ENGINEER' G. SARBER METHODS OF COMPLFFATION TOOL LOCATION: MINIMU~ CURVATURE INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARQET AZIMUTH OF SOUTH 77 DEG &O MIN WEST COMPUTATION DATE' lO-NOV-93 PAGE I ARCO AI_A~KA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' NOV-4-1993 KELLY BUSHING EJ..EVATION' 135.00 Fl' INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0 O0 -135.00 99 199 299 399 499 599 699 797 895 0 0 99 -35,01 0 16 99 64.99 0 27 99 164.99 0 35 98 264.98 0 37 97 364.97 I 25 86 464.86 4 8 28 564.28 7 42 92 662.92 11 19 10 760.10 15 32 N 0 0 E N40 OE N 30 21 E N 29 50 E N 325W N63 9W N 86 27 W S 86 34 W S 84 59 W S 83 47 W O0 O0 O0 O0 O0 990.86 855 86 17 46 54 19 27 46 20 50 30 22 53 58 25 7 16 27 46 27 31 7 96 35 26 44 39 25 60 42 57 S 83 41 W S82 2W S81 7W S 79 40 W S 78 30 W S 77 10 W S 77 OW S 78 15 W S 77 40 i S 77 27 W ENGINEER- G. SARBER 0.00 100 O0 200 O0 300 O0 400 O0 500 600 700 800 900 1000 O0 1100 O0 1085.54 950 1200 O0 1179.46 1044 1300 O0 1272.30 1137 1400 O0 1363.58 1228 1500 O0 1453.16 1318 1600 O0 1540.27 1405 1700.00 1623.96 1488 1800.00 1703.44 1568 1900.00 1778.60 1643 2000.00 1850.03 1715 03 45 52 2100 O0 1917 33 1782 44 1845 92 1903 14 1958 91 2007 19 2052 30 2091 71 2128 93 2166 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 2200 2300 2400 2500 2600 2700 2800 290O 0.00 -0.16 -0.57 -1.24 -i .77 -1.03 3.09 13.46 29.59 52.93 81 58 113 62 147 88 184 97 225 79 270 21 319 28 373 96 434 60 500.52 S 77 59 W 570.49 33 49 17 S 77 42 W 644.42 44 52 19 S 77 20 W 721 97 92 55 34 S 77 56 W 803 07 14 58 29 S 77 47 W 887 07 91 61 49 S 77 32 W 973 79 19 65 24 S 78 5 W 1063 43 30 68 0 S 78 53 W 1155 44 71 67 48 S 79 3 W 1248 16 93 67 19 S 78 54 W 1340 55 O0 1980 O0 2038 O0 2093 O0 2142 O0 2187 O0 2226 O0 2263 O0 2301 S 78 40 W 1432.68 S 78 53 W 1524 41 3000.00 2340.79 2205.79 66 59 3100.00 .2380.58 2245.58 66 7 3200.00 2420.54 2285.54 67 12 3300.00 2459 09 2324.09 67 17 3400.00 2498 10 2363.10 66 47 3500.00 2536 16 2401.16 69 9 3600.00 2571 65 2436.65 68 57 3700.00 2608 18 2473.18 68 15 3800.00 2645 80 2510.80 67 24 3900.00 2684.98 2549.98 66 30 O6 30 36 8O 27 35 O0 O0 S 79 10 W 1616 S 79 10 W 1708 S 79 6 W 1800 S 79 6 W 1892 S 78 50 W 1986 S 78 30 W 2079 S 78 25 W 2172 S 78 19 W 2264 0 O0 0 37 0 21 0 22 0 21 0 87 2 18 3 33 I 34 3 07 0.00 N 0.17 N 0.62 N 1.44 N 2.35 N 3.52 N 4.32 N 4.10 N 2.92 N 0.55 N 0.00 E 0.13 E 0.45 E 096E 131E 030 E 409W 14 65 W 30 90 W 54 26. W 000 N 0 0 E 0 0 1 2 3 5 15 31 54 21 N 37 24 E 77 N 35 42 E 73 N 33 50 E 69 N 29 3 E 53 N 4 50 E 95 N 43 25 W 22 N 74 22 W 04 N 84 36 W 26 N 89 25 W 3.68 3.06 2.18 1.77 1,86 2,16 2,65 3,19 3.65 3.90 2595 ' 6 11 17 25 35 46 57 70 84 71S 114 72 S 148 85 S 185 64 S 225 06 S 268 14 $ 316 88 S 370 38 S 429 78 W 114 75 W 149 37 W 186 45 W 226 86 W 271 66 W 320 07 W 374 41W 435 66 S 493.77 W 500 82 89 W 82 93 S 88 12 W 98 S 86 39 W 21 S 85 30 W 23 S 84 30 W 90 S 83 31W 14 S 82 34 W 01 S 81 43 W 57 S 81 7 W 14 S 80 41W 97 S 80 16 W 3.69 3 46 3 23 3 19 3 11 3 06 3 12 3 30 0 44 0 47 99 56 S 562.13 W 570.88 S 79 57 W 115 10 S 634.41 W 644 77 S 79 43 W 131 94 S 710.11W 722 149 20 S 789.35 W 803 166 85 S 871.48 W 887 185 45 S 956.18 W 974 204 44 S 1043.79 W 1063 222.85 S 1133.95 W 1155 240.45 S 1225.00 W 1248 258.12 S 1315.70 W 1340 27 S 79 28 W 32 S 79 18 W 31 S 79 10 W O0 S 79 1W 62 S 78 55 W 64 S 78 53 W 37 S 78 54 W 78 S 78 54 W O. 48 0.58 0.74 0 75 0 69 0 94 1 04 1 15 0 94 0 84 276.02 S 1406 09 W 1432 92 S 78 54 W 294 03 S 1496 311 328 346 363 381 399 418 437 51S 1586 82 S 1676 20 S 1767 70 S 1857 55 S 1949 92 S 2040 48 S 2131 03 S 2221 04 W 1524 03 W 1616 66 W 1708 08 W 1800 87 W 1893 65 W 1986 90 W 2079 68 W 2172 79 W 2264 66 S 78 53 W 33 S 78 53 W 60 S 78 54 W 67 S 78 55 W 14 S 78 55 W 63 S 78 56 W 72 S 78 55 W 36 S 78 54 W 37 S 78 52 W COMPUTATION DATE' lO-NOV-g3 PAGE 2 ARCO ALASKA INC. 2A - 20 KLIPARUK RIVFJ;i NORTH SLOPE, ALASKA DATE OF SURVEY: NOV-4-1993 KELLY BUSHING ELEVATION: 135.00 FT . ENGINEER: G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF ~EASU~ED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG ~IN 4000 O0 2725 26 2590 26 65 59 4100 4200 4300 4400 45OO 4600 4700 4800 49O0 O0 2766 O0 2809 O0 2851 O0 2895 O0 2938 O0 2982 O0 3026 O0 3O70 53 2631 O1 2674 83 2716 33 2760 97 2803 74 2847 98 2891 57 2935 O0 3113.50 2978 53 65 17 O1 64 38 83 64 16 33 64 11 97 64 5 74 63 52 98 63 41 57 64 35 50 64 32 5000 O0 3155.24 3020 24 65 52 5100 5200 5300 5400 5500 5600 5700 5800 5900 O0 3196 39 3061 O0 3238 O0 3281 O0 3324 O0 3365 O0 3406 O0 3448 O0 3490 O0 3529 37 3103 27 3146 45 3189 44 323O 46 3271 45 3313 17 3355 71 3394 39 65 21 37 64 52 27 64 20 45 64 58 44 66 5 46 65 29 45 64 52 17 66 17 71 66 37 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG MIN FEET S 78 11W 2355.52 S 78 4 W 2446.61 S 77 23 W 2537.13 S 77 12 W 2627.50 S 77 3 W 2717.53 S 77 6 W 2807.50 S 76 59 W 2897.40 S 77 23 W 2987.08 S 78 23 W 3077.07 S 78 26 W 3167.39 DEG/IO0 FEET FEET FEET DEG MIN 0 78 0 78 0 78 0 71 0 63 0 40 0 27 0 45 0 73 0 68 455 67 S 2311 40 W 2355 89 S 78 51 W 474 493 513 533 553 573 594 612 630 44 S 2400 62 S 2489 52 S 2577 62 S 2664 77 $ 2752 94 S 2840 07 S 2927 71S 3015 85 S 3104 53 W 2446 O0 W 2537 15 W 2627 92 W 2717 61W 2807 23 W 2897 63 W 2987 67 W 3077 15 W 3167 97 $ 78 49 W 48 S 78 47 W 82 S 78 44 W 82 $ 78 41W 76 S 78 38 W 64 S 78 35 W 29 S 78 32 W 29 S 78 31W 60 $ 78 31W S 78 30 W 3258 25 S 78 26 W 3349 S 78 14 W 3440 S 78 4 W 3530 S 77 57 W 3620 S 77 32 W 3711 S 77 23 W 3803 S 77 6 W 3893 S 77 19 W 3984 S 77 19 W 4076 38 14 47 67 88 07 82 7O 54 0 9O 0 75 0 77 0 6O 0 63 0 93 0 96 0 74 0 82 0 96 649 06 S 3193 17 W 3258 47 S 78'31 W 667 685 704 723 742 762 782 8O2 822 31S 3282 72 S 3371 28 S 3459 O0 S 3547 43 S 3637 21S 3726 27 S 3814 46 S 3903 62 S 3992 47 W 3349 34 W 3440 75 W 3530 98 W 3620 09 W 3712 12 W 3803 63 W 3894 24 W 3984 85 W 4076 61 S 78 31W 37 S 78 30 W 70 $ 78 30 W 89 S 78 29 W 09 S 78 28 W 28 S 78 26 W 02 $ 78 25 W 88 S 78 23 W 71 5 78 22 W 6000 O0 3570.03 3435 03 65 50 6100 6200 6300 6400 6500 6600 6700 6800 6900 O0 3609.96 3474 O0 3648.63 3513 O0 3688.09 3553 O0 3728.81 3593 O0 3770.42 3635 O0 3810.35 3675 O0 3849.56 3714 O0 3889.59 3754 O0 3929.95 3794 96 67 16 63 67 5 09 66 25 81 65 38 42 65 31 35 67 8 56 66 39 59 66 10 95 66 48 $ 77 13 W 4168 05 S 77 46 W 4259 S 77 34 W 4351 $ 77 24 W 4443 S 77 6 W 4535 S 76 57 W 4626 S 77 30 W 4717 S 77 11W 4809 S 76 38 W 4901 S 76 26 W 4992 72 94 83 15 08 75 74 36 82 I 05 0 92 0 97 0 45 0 66 0 7O I 05 0 95 0 83 0 85 842 79 $ 4082 11 W 4168 20 S 78 20 W 862 882 902 922 942 963 983 1004 1025 63 S 4171 32 S 4261 27 S 4351 46 S 4440 91S 4529 20 S 4618 30 S 4708 04 S 4797 54 S 4886 61W 4259 71W 4352 40 W 4443 48 W 4535 08 W 4626 48 W 4717 25 W 4809 51W 4901 44 W 4992 87 S 78 19 W 09 S 78 18 W 96 S 78 17 W 28 S 78 16 W 19 S 78 14 W 85 S 78 13 W 83 S 78 12 W 45 S 78 11W 90 S 78 9 W 7000 O0 3968.02 3833.02 67 57 7100 7200 7300 7400 7500 7600 7700 780O 7900 O0 4314 O0 4006.07 3871.07 67 20 O0 4045.42 3910.42 66 21 O0 4085.15 3950 15 67 38 O0 4122 74 3987 74 67 47 O0 4160 89 4025 89 67 25 0'0 4199 78 4064 78 66 43 O0 4238 72 4103 72 67 41 O0 4276 84 4141 84 67 22 62 4179 62 67 46 S 75 49 W 5085 25 S 75 13 W 5177 $ 74 19 W 5269 S 76 5 W 5361 S 75 48 W 5453 S 75 32 W 5546 S 75 12 W 5638 S 77 25 W 5730 S 77 32 W 5822 S 79 12 W 5915 65 45 08 70 07 11 18 62 19 1 22 1 25 1 07 1 45 1 55 1 31 0 66 1 37 0 42 0 95 1047 65 S 4976 22 W 5085 31 S 78 7 W 1070 1094 1118 1141 1164 1187 1209 1229 1247 80 S 5065 98 S 5154 94 $ 5243 28 S 5332 19 S 5422 57 S 5511 37 S 5601 40 S 5691 41S 5782 75 W 5177 69 S 78 4 W 45 W 5269 47 S 78 0 W 02 W 5361 09 S 77 57 W 96 W 5453 71 S 77 55 W 51 W 5546 08 S 77 53 W 62 W 5638 11 S 77 50 W 10 W 5730 18 S 77 49 W 35 W 5822 62 S 77 49 W 17 W 5915 19 S 77 50 W COMPUTATION DATE' lO-NOV-g3 PAGE 3 ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' NOV-4-1993 KELLY BUSHING ELEVATION' 135.00 ET ENGINEER' G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANCAJLAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8000 O0 4352 67 4217.67 67 27 8100 8200 8300 8400 8500 8600 8700 8800 8900 O0 4391 18 4256.18 67 8 O0 4430 48 4295.48 66 38 O0 4470 61 4335.61 66 4 O0 4511 71 4376.71 65 31 O0 4552 56 4417.56 67 4 O0 4590 35 4455.35 67 50 O0 4628.26 4493.26 57 35 O0 4666.50 4531.50 67 10 O0 4705.48 4570.48 67 11 S 78 51W 6007 65 S 78 25 W 6099 93 S 78 13 W 6191 88 S 77 57 W 6283 47 S 77 49 W 6374 63 S 76 14 W 6465 90 S 74 43 W 6558 38 S 74 17 W 6650 76 S 73 53 W 6742.96 S 74 33 W 6834.85 1 O0 0 72 0 52 0 57 0 59 1 01 1 54 1 53 0 99 0 64 1265.02 S 5872 96 W 6007.65 S 77 51 W 1283.22 S 5963 1301.89 S 6053 1320.82 S 6143 1339.97 S 6232 1360.09 S 6321 1383.73 S 6410 1408.47 S 6499 1433,87 S 6588 1459.11 S 6677 43 W 6099.93 S 77 51W 47 W 6191.88 S 77 52 W 08 W 6283.47 S 77 52 W 21 W 6374.64 S 77 52 W 24 W 6465.90 S 77 51 i 75 W 6558.38 S 77 49 W 91 W 6650.76 S 77 46 W 76 W 6742.97 S 77 43 W 31 W 6834.88 S 77 40 W 9000 O0 4745 O0 4610.00 66 10 9100 9200 9300 9400 9500 9600 9700 9800 O0 4785 O0 4827 O0 4868 O0 4910 O0 4950 O0 4990 O0 5029 O0 5067 9900.00 5109 90 4650 90 65 35 18 4692 19 4733 35 4775 73 4815 51 4855 23 4894 89 4932 13 4974 18 65 58 19 65 21 35 65 13 73 66 32 51 66 39 23 67 25 89 67 4 13 64 46 S 73 56 W 6926.53 S 73 45 W 7017.56 S 75 5 W 7108.47 S 75 19 W 7199.57 S 75 21W 7290.16 S 76 19 W 7381.60 S 76 22 W 7473.31 S 76 46 W 7565.49 S 76 27 W 7657.69 S 74 13 W 7748.67 0 90 0 95 I 07 0 89 0 93 0 72 0 63 0 81 0 53 I 84 1483.98 S 6765.74 W 6926.58 S 77 38 W 1509 39 S 6853.38 W 7017 63 S 77 35 W 1533 1557 1580 1602 1624 1645 1666 1690 96 S 6941.09 W 7108 25 S 7029.26 W 7199 34 S 7116.95 W 7290 43 S 7205.73 W 7381 10 S 7294.88 W 7473 36 S 7384.59 W 7565 69 S 7474.32 W 7657 16 S 7562.32 W 7748 57 S 77 32 W 69 S 77 31W 30 S 77 29 W 76 S 77 28 W 49 S 77 27 W 67 S 77 26 W 89 S 77 26 W 89 S 77 24 W 10000 O0 5154.63 5019.63 61 46 10100 10200 10300 10400 10500 10600 10700 10800 10900 O0 5203.62 5068.62 59 48 O0 5255.44 5120.44 57 54 00' 5310.60 5175 60 55 5 O0 5369.55 5234 55 52 44 O0 5431.11 5296 11 51 12 O0 5495.87 5360 87 47 52 O0 5564.04 5429 04 46 12 O0 5634,63 5499 63 '43 42 O0 5708,43 5573 43 41 8 S 74 36 W 7837 55 S 75 20 W 7924 S 74 55 W 8010 S 73 22 W 8093 S 73 22 W 8173 S 73 19 W 8252 S 74 16 W 8328 S 75 16 W 8401 S 73 23 W 8472 S 73 44 W 8539 61 03 25 76 33 30 35 04 29 2 51 2 91 2 31 2 23 2 33 2 23 2 37 2 22 2 58 2 71 1713 93 S 7648 12 W 7837 81 S 77 22 W 1736 1758 1781 1804 1826 1848 1867 1886 1905 48 S 7732 46 S 7814 26 S 7895 39 S 7972 85 S 8048 33 S 8121 53 S 8191 42 S 8260 88 S 8324 33 W 7924 97 W 8010 18 W 8093 56 W 8174 10 W 8252 18 W 8328 77 W 8401 01W 8472 61W 8539 91 S 77 21W 36 S 77 19 W 63 S 77 17 W 20 S 77 15 W 83 S 77 13 W 86 S 77 11W 95 S 77 9 W 68 S 77 8 W 99 S 77 6 W 11000.00 5783.33 5648 33 42 3 11100.00 5856 91 S721 91 43 14 11200.00 5929 32 5794 32 43 47 11300.00 6001 66 5866 66 43 24 11400.00 6074 01 5939 01 44 1 11500.00 6145 93 6010 93 44 1 11545.00 5178 29 6043 29 44 I S 77 33 W 8605.48 S 81 51'W 8673.13 S 82 33 W 8741.88 S 83 36 W 8810.65 S 86 13 W 8879.01 S 86 13 W 8947.76 S 86 13 W 8978.70 2 61 2 91 2 38 0 81 0 O0 0 O0 0 O0 1922.37 S 8388 76 W 8606.21 S 77 6 W 1934 38 S 8455 38 W 8673.83 S 77 7 W 1943 58 S 8523 73 W 8742.51 S 77 9 W 1952 09 S 8592 24 W 8811.20 S 77 12 W 1958 04 S 8660 89 W 8879.47 S 77 16 W 1962 64 S 8730 22 W 8948.12 S 77 20 W 1964 71 S 8761 42 W 8979.01 S 77 22 W COMPUTATION DATE' lO-NOV-93 PAGE 4 ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' NOV-4-1993 KELLY BUSHING ELEVATION' 135.00 FT ENGINEER' O. SARBER INTERPOLATED VALUES FOR EVEN 1OOO FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH D~::~TH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/1OO FEET FEET FEET DEG NIIN 0 O0 1000 2000 3000 4000 5000 6000 7000 8000 9000 O0 O0 1850.03 1715 O0 2340 79 2205 oo 2725 26 2590 oo 3155 24 3020 O0 3570 03 3435 O0 3968 02 3833 O0 4352 67 4217 O0 4745 O0 4510 0.00 -135.00 0 0 990.86 855 86 17 46 03 45 52 79 66 59 26 65 59 24 65 52 03 65 50 02 67 57 67 67 27 GO 66 10 N 0 0 E 0 O0 S 83 41W 81 58 S 77 59 W 570 49 S 78 40 W 1432 68 S 78 11W 2355 52 S 78 30 W 3258 25 S 77 13 W 4168 05 S 75 49 W 5085.25 S 78 51W 6007.65 S 73 56 W 6926.53 0. O0 3.68 3.69 0.48 0 78 0 90 1 05 1 22 1 O0 0 90 o O0 N 2 99 276 455 649 842 1047 1265 1483 o oo E 59 S 82 56 S 562 02 S 1406 67 S 2311 06 S 3193 79 S 4082 65 S 4976 02 S 5872 98 S 6765 89 W 82 13 W 570 09 W 1432 40 W 2355 17 W 3258 11W 4168 22 W 5085 96 W 6007 74 W 6926 0 O0 N 0 0 E 93 S 88 12'W 88 S 79 57 W 92 S 78 54 W 89 S 78 51W 47 $ 78 31W 20 S 78 20 W 31 S 78 7 W 65 S 77 51W 58 S 77 38 W 10000.00 5154.63 5019.63 61 46 11000.00 5783.33 5648.33 42 3 11545.00 6178.29 6043.29 44 1 S 74 36 W 7837.55 S 77 33 W 8605.48 S 86 13 W 8978.70 2.51 2.61 0. O0 1713.93 S 7648.12 W 7837.81 S 77 22 W 1922.37 S 8388.76 W 8606.21 S 77 6 W 1964.71 S 8751.42 W 8979.01 S 77 22 W COMPUTATION DATE: lO-NOV-g3 PAGE 5 'ARCO ALASKA INC. DATE OF SURVEY' NOV-4-1993 2A - 20 KFI! Y BUSHING ELEVATION' 135.00 FT KUPARLJK RIVER NORTH SLOPE, ALASKA ENGINEER' G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPlld TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARllJRE MEASURED VERTICAL VERTICAL DEVIATION AZIk~Jl'H SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZID~JI'H DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG 0.00 0.00 -135,00 0 0 N 0 0 E 135.01 135.00 0.00 0 18 N 39 24 E 235.01 235.00 100.00 0 33 N 34 14 E 335,02 335.00 200.00 0 34 N 27 27 E 435.02 435 O0 300.00 0 48 N 29 33 W 535.05 535 O0 400.00 2 9 N 75 33 W 635.27 635 O0 500.00 5 34 N 89 49 W 736.10 735 O0 600.00 8 49 S 86 13 W 837.93 835 O0 700.00 13 2 S 84 21 W 941.54 935 O0 800.00 16 37 S 83 45 W 0.00 -0.30 -0.79 -1 47 -1 74 -0 09 5 98 18 59 37 53 64 43 1046 50 1035 O0 900.00 18 46 S 82 40 W 1152 54 1135 1259 66 1235 1368 51 1335 1479 57 1435 1593 85 1535 1713 63 1635 1841 33 1735 1978.53 1835 2127.27 1935 O0 1000.00 20 5 S 81 39 W 131 O0 1100.00 21 55 S 80 31 W 169 O0 1200.00 24 28 S 78 50 W 212 O0 1300.00 27 13 S 77 21 W 260 O0 1400.00 30 52 S 76 59 W 316 O0 1500.00 35 52 S 78 19 W 381 O0 1600.00 41 0 S 77 29 W 461 O0 1700.00 45 24 S 77 53 W 555 O0 1800.00 50 4 S 77 34 W 665 96 12 31 62 58 85 11 95 27 15 19 2293.08 2035.00 1900 O0 55 23 S 77 54 W 797 37 2483.55 2135.00 2000 O0 61 17 S 77 32 W 959 37 2723.26 2235.00 2100 O0 68 12 S 79 5 W 1177 O1 2985.15 2335.00 2200 O0 67 3 S 78 43 W 1419 01 3237.47. 2435.00 2300 O0 67 23 S 79 13 W 1650 61 3496.72 2535.00 2400 O0 69 7 S 79 7 W 1889 73 3771.71 2635.00 2500 O0 67 46 S 78 26 W 2145 86 4023.88 2735.00 2600.00 65 48 S 78 9 W 2377 33 4260.86 2835.00 2700.00 64 45 S 77 16 W 2592 16 4490.90 2935.00 2800,00 64 4 S 77 6 W 2799.32 4718 15 3035.00 2900.00 63 51 S 77 43 W 3003.35 4950 5192 5425 5668 5913 6164 6414 6663 6912 82 3135.00 3000.00 65 26 S 78 27 W 3213.43 05 3235.00 3100.00 64 57 S 78 14 W 3432.94 22 3335.00 3200 O0 65 34 S 77 49 W 3643.57 23 3435.00 3300 O0 65 2 S 77 11 W 3865.04 31 3535.00 3400 O0 66 32 S 77 18 W 4088.76 89 3635.00 3500 O0 67 14 S 77 39 W 4319.58 95 3735,00 3600 O0 65 31 S 77 5 W 4548.76 12 3835.00 3700 O0 66 51 S 77 21W 4775.85 87 3935.00 3800 O0 67 6 S 76 25 W 5004.66 0 O0 0 21 0 20 0 19 0 43 I 26 2 75 3 51 I 99 3 49 0.00 N 0.30 N 0 0.88 N 0 1.74 N 1 2.75 N 1 3.88 N 0 4.41 N 7 3.78 N 19 2.19 N 38 O. 71 $ 65 24 E 0 61 E 1 13 E 2 19 E 3 75 W 3 07 W 8 83 W 20 86 W 38 76 W 65 0 O0 E 0 O0 N 0 0 E 38 N 38 37 E 07 N 34 55 E O8 N 33 I E O0 N 23 25 E 95 N 10 55 W 33 N 58 2 W 19 N 79 13 W 92 N 86 47 W 76 S 89 23 W 3.42 2.54 1.85 I 85 2 07 2 59 3 25 3 79 3 74 3 4 35 S 97.39 W 97.49 S 87 27 W 9 15 23 33 45 59 76 96 39 '119.54 S 654.69 W 665 22 S 132.33 W 132 66 S 86 I W 21 S 170.24 W 170 04 S 212.49 W 213 O0 S 259.73 W 261 42 S 313.58 W 316 49 S 377.90 W 382 13 S 455.45 W 461 35 S 547.13 W 555 92 S 84 54 W 74 S 83 49 W 82 S 82 46 W 85 S 81 45 W 55 S 81 3 W 77 S 80 31W 55 S 80 I W 52 S 79 39 W 3 21 3 07 3 2O 0 48 0 80 0 93 I 11 0 78 0 69 0 43 148.01 S 783 78 W 797 63 S 79 18 W 182 33 S 942 226 273 317 363 413 460 505 551 10 W 959 99 S 1155 11 W 1177 35 S 1392 68 W 1419 99 S 1619 98 W 1650 i2 S 1854 86 W 1890 23 S 2106 07 W 2146 15 S 2332.74 W 2377 71S 2542.69 W 2592 94 S 2744.64 W 2799 59 S 79 3 W 21 S 78 53 W 25 S 78 54 W 89 S 78 54 W 07 S 78 55 W 22 S 78 54 W 69 S 78 50 W 49 S 78 45 W 58 S 78 38 W 0.49 0.84 0.78 0.78 O. 90 0.96 I. O0 O. 67 O. 94 0.96 1028.32 S 4897 597.57 S 2943.52 W 3003 57 S 78 31W 640,09 S 3149.26 W 3213 684.26 S 3364.29 W 3433 727.81 S 3570.37 W 3643 775.86 S 3786 57 W 3865 825.30 S 4004 77 W 4088 875..37 S 4230 10 W 4319 925.50 S 4453 74 W 4548 975,83 S 4675 20 W 4775 65 S 78 31W 17 S 78 30 W 80 S 78 29 W 24 S 78 25 W 93 S 78 21W 73 S 78 18 W 89 S 78 16 W 95 S 78 13 W 94 W 5004.73 S 78 9 W COMPUTATION DATE: ZO-NOV-93 PAGE 6 ARCO ALASKA INC. 2A - 2O KLPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: NOV-4-1993 KELLY BUSHTNG ELEVATION: 135.00 FT ENGINEER: G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF SL~-SEA DEPTH ll~UE SL~-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZI~J-rH DEPTH DEPTH DEPTH DEG MIN DEG 7173 90 4035.00 3900.00 66 36 7432 7690 7953 8211 8456 8717 8975 9219 9460 33 4135.00 4000.00 67 38 20 4235.00 4100.00 67 37 71 4335.00 4200.00 67 40 39 4435.00 4300.00 66 37 29 4535.00 4400.00 65 46 70 4635.00 4500.00 67 37 13 4735.00 4600.00 66 27 18 4835.00 4700.00 65 46 4935.00 4800.00 66 35 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZI&~JTH FEET DEG/IO0 FEET FEET FEE/ DEG MIN S 74 33 W 5245 56 S 75 40 W 5483 S 77 21W 5721 S 79 2 W 5964 S 78 13 W 5202 S 77 19 W 6425 S 74 13 W 6667 S 74 5 W 6903 S 75 11W 7125 S 76 19 W 7345 59 11 87 33 8,8 09 81 96 34 I . 15 1.45 I . 33 0.99 0.52 O. 65 1.54 O. 78 I. 08 0.65 1088 55 S 5131.40 W 5245 59 S 78 1 W 1148 1207 1256 1304 1350 1412 1477 1538 1593 65 $ 5361.94 W 5483 40 S 5592.25 W 5721 81 S 5830.96 W 5964 02 S 6063.70 W 6202 96 S 6282.26 W 6425 92 $ 6515.66 W 6667 70 S 6743.86 W 6903 46 S 6958.01W 7126 60 S 77 55 W 11 S 77 49 W 87 S 77 50 W 33 S 77 52 W 88 S 77 52 W 09 S 77 46 W 85 S 77 38 W O6 S 77 32 W 85 $ 7170.49 W 7345.49 S 77 28 W 9715.00 5035.00 4900.00 67 21 9958.24 5135.00 5000.00 62 8 10161 23 5235.00 5100.00 58 30 10342 12 5335.00 5200 O0 54 3 10506 17 5435.00 5300 O0 51 5 10657 79 5535.00 5400 O0 46 54 10800 51 5635.00 5500 O0 43 42 10935 31 5735.00 5600 O0 41 13 11070 03 5835.00 5700 O0 42 52 11207 86 5935.00 5800 O0 43 47 S 76 45 W 7579 34 S 74 43 W 7800 S 75 3 W 7977 S 73 22 W 8127 S 73 19 W 8257 S 74 53 W 8370 S 73 23 W 8472 S 74 54 W 8562 S 80 47 W 8652 S 82 35 W 8747 75 13 47 11 75 39 49 71 30 O. 75 2.19 2.34 2.31 2.23 2.31 2.58 2.52 2.88 2.32 1648 53 S 7398 07 W 7579 52 S 77 26 W 1704 1749 1791 1828 1859 1886 1912 1931 1944 17 S 7612 92 S 7783 09 S 7928 22 S 8052 66 S 8162 52 S 8260 15 S 8346 26 S 8435 28 S 8529 59 W 7801 O0 S 77 23 W 15 W 7977 45 S 77 20 W 07 W 8127 87 $ 77 16 W 68 W 8257 61 S 77 13 W 16 W 8371 33 S 77 10 W 35 W 8473.03 S 77 8 W 99 W 8563.21 $ 77 6 W 17 W 8653.43 S 77 6 W 12 W 8747.92 S 77 10 W 11345.92 6035.00 5900.00 43 34 11484.81 6135.00 6000.00 44 1 11545.00 6178.29 6043.29 44 1 S 84 49 W 8842.04 S 86 13 W 8937.32 $ 86 13 W 8978.70 O. 97 0. O0 0. O0 1955.30 S 8623.66 W 8842.55 S 77 13 W 1961.94 S 8719.69 W 8937.68 S 77 19 W 1964.71 S 8761.42 ~ 8979.01 S 77 22 ~ ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA I~IARKER 9 5/8" CASING GCT LAST READING PBll) 7 u CASING 'il) ' COMPUTATION DATE: lO-NOV-93 PAGE 7 DATE OF SURVEY- NOV-4-1993 KELLY BUSHING ELEVATION: 136. O0 FT ENGINEER: G. SARBER INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 696~ FSL, 53~ FEE,, SEC14 TllN RSE MEASURED DEPTH TVD BELOW KB FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOLFFH EAST/WEST 4167.00 2794.84 2659.84 487.16 S 2459.91W 11390.00 6066.82 5931.82 1957.70 S 8654.06 W 11439.00 6102.06 5967.06 1959.84 S 8687.93 W 11528.00 6166.06 6031.06 1963.93 S 8749.64 W 11545.00 6178.29 6043.29 1964.71 S 8761.42 W ARCO ALASKA INC. 2A - 20 KUPARUK RIVER NORTH SLOPE, ALASKA MARKER COMPUTATION DATE: lO-NOV-93 PAGE 8 DATE OF SURVEY: NOV-4-1993 KELLY E~JSHING ELEVATION: 135.00 Fl- ENGINEER: G. SARBER **~**~.~***~ STRATIGR~J~HIC SL~ARY SL~FACE LOCATION = 696' FSL, 53' FEE,, SEC14 T11N RSE MEASURED DEPTH -rVD RECTANGU~R COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 11545.00 6178.29 6043.29 1964.71 $ 8761.42 W FINAL WELL LOCATION AT 11): TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 11545.00 6178.29 6043.29 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 8979.01 S 77 22 W DIRECTIONAL SURVEY COMPANY ARCO ALASKA INC. FIELD KUPARUK RIVER WELL 2A - 20 COUNTRY USA RUN I . DATE LOGGED 4 - NOV - 19 DEPTH UNIT FEET REFERENCE 93516 All Interpr~taflofle &r~ oplnlonI b~ on inferencel from elecfrf=al or other mluur~m®nt~ and we cannot. ~nd do not guarantee the accuracy or corr~ctheu of any interl=retaUon$, and w~ Ih&l! r'~. eXCel=t In the ca~e of gn=e~ or wilfull n~gllgence on our part. be liable or relponlib~ for any Io~e, colt~, d~mag~ or expenue ~cun'~cl or anyone reeulflng fr~m any Int®rpmtatlort made by e. ny ot' our offi¢tm, agent~ ¢w employle~. T'ne~ In~er~0retat~or~ are aJ~o tubje~=t to our (~ener~J Terme and Condlt~onl u I~t o~ in our current price ~ELL: 2A-20 ~696'FSL, 53'FEL, SEC.14, T11N, ,.~,~, UM) H£ LONTAL PROJECTION 8000 6OOO 4OOO 2O0O i i , ! ]~ ~]~ ,, i~ . "1 i -2O00 - 12000 - 10000 -8000 -6000 -4000 -2000 0 2000 WF-~T 4000 .' 2A-20 $'FSL, 53'F~L, S1~C.14, TllN, i. ', UH) VI 'ICAL PRO,JECTION 78 O0 -4000 -2000 0 0 2°00 4000 6000 8000 10000 12000 :i : .:. ::.: ::: :::. :::! .:i. .i:. :~;: ;::: :.:- i:i~ ::: : .: ~,. :.: :.: ;.: ; : .. ~::;. ~i :.:' .::: ::~ ...... --:-: : --~.-~ ~-: ..... ~---~ : ..... ~---; ~ ~ ~.-~ ~-~--~.~--~4 --: ~-~ ; ..... ~--~.:-: .~ ~ ~--: ~--;-..~--:- : : : ..... : .~: ......... ::-: :: :: : ~ ~: [~ .~:~: ~ - ............. ~ ...... :...:...~...~ ...... ~...~...~...:...: ....... :...: .......... , .......................... . ...................................... '. .. :....... ~ ; :~ : -:: .... : :::: ':: ::: .... ::: · - : : / :~':~ .... ~'~ ..... ~'-~"~ ...... ~-~: ':'~':'~ .... ~-~ ........... ~'~ '"~- ': ......... :~'~ .......... ~: ':'' '"~"'""''"'''~: ': ........... :.:~:::~ : ~ ::: -::. ::: :: :~ . ': . .. :~ : : -- PROJECTION ON VERTICAL IDL.ANE 7~.00 ~CALEO IN VERTICAL DEPTH8 HO~Z SCAL.~ = I / 2000 IN/FT ECE!VED ...... .... ()~i & O,~s tx.;l~. ...... fir;remission. ARCO Alaska, Inc. Date' January 14, 1994 Transmittal #: 8981 RETURN TO' ARCO Alaska, Inc. Attn: Sarah Bowen Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted below are the following .qp_ej3_hole items. Please acknowledge receipt and return one signed copy of this transmittal. /2A-21 ¢~.. \~'~,/k 2A-21 / %?.A-21 ./2A-17 ,~%., lq-o ~2A-17 ~.A-17 /2A-23 cl~..iu~ {2A-23 \2A-23 72A-24 ¢¢.~- iqq ~. 2A-24 2A-24 ,.-.;.- !<~\ ~,-' 2A-20 '~'.-- -~ 2A-20 , ' 2A-20 Acknowledged: Dual Compensated Neutron ,(CNTG) -¢ CDN LWD/Depth Corre-cted ¢"CDRLWD/Depth Corrected ',./CDR Enhancement LWD/Depth Corrected ¢CDN LWD/Depth Corrected ¢CDRLWD/Depth Corrected -,/CDR Enhancement LWD/Depth Corrected vCDN LWD/Depth Corrected ,¢CDR LWD/Depth Corrected -¢CDR Enhancement LWD/Depth Corrected ,/'CDN LWD/Depth Corrected O 6~ G~ LWD/Depth Corrected · ,-'CDR Enhancement LWD/Depth Corrected ,,'CDR LWD/Depth Corrected ,-d~- DN LWD/Depth Corrected c-'CDR Very-Enhanced Resistivity LWD/Depth Corrected / ~ - DISTRIBUTION' 09-08-93 ¢'.': 6450-7689 09-17-21-93 ;~4650-11800 '~'¥S 09-17-21-93 6,\4700-11800 09-17-21-93 ~t 11100-11800 09-26-28-93 ¢.\4090-9900 ~"r5 09-26-28-93 .I, 4100-9920 ~-k~ 09-26-28-93~' 9200-9910 5' ,..-.... 10-04-08-93 10-04-08-93 10-04-08-93 10-12-15-93 10-12-15-93 10-12-15-93 4300-11650 4300-11660 .i. 11000-11660 __._'~ 3400-9800 ~- ~"~"t~ a ,:.,~-.5 3400-9800 ¢,- ~-r,,~ 3400-9630 ¢koccr'¢c 5" 10-19-23-93 10-19-23-93 10-19-23-93' Date' ARCO Alaska, Inc. cl qO Date' January 14, 1994 Transmittal Cf: 8980 RETURN TO: ARCO Alaska, Inc. Attn: Sarah Bowen Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. and return one signed copy of this transmittal. 1 Y-27 ~5~",~5& Please acknowledge receipt Ll~S__T. ape~nd Listing: ~t.~'C~,'''1-'~''''''10-28-93 93426 Cased Hale--TEPT¢-¢3 passes and average 1Y-18 ~?;-~%~ LIS Tape and Listing: 10-28-93 93423 1Y-23 5¢1 ~;~ LIS Tape and Listing: 10-28-93 93425 c~-CNTG Main and repeat passes, tctcoK- -:/-'~% P,\ 10-04-93 93429 12-07-93 with QRO Processing 12-07-93 with QRO Processing 12-07-93 with QRO Processing 12-19-93 with QRO Processing 1Y-31 5q5'~ LIS Tape and Listing: ~~-e~CNTG 2A-21 -~ct 5~ LIS Tape and Listing: Ck-CDR/CDN, 2 Bit Runs 2A-17 ~~ LIS Tape and Listing: o~-CDR/CDN, 2 Bit Runs 2A-23 50,5~ LIS Tape and Listing: o~-CDR/CDN, 2 Bit Runs 2A-24 5q 5~ LIS Tape and Listing: o~-CDR/CDN, 1 Bit Runs 93452 H~-i ~ 93474 93470 93480 93497 Date' 2A-20 5q6;¢ LIS Tape and Listing'. 12-20-93 oil-CDR/CDN, 2 Bit Runs with QRO Processing Receipt Acknowledged: _/~- ."t~._./~.~L "~/~_~~,.' L) Bob Ocanas State of Alaska DISTRIBUTION: ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 January 10, 1994 Phyllis Billingsley ARCO Alaska inc P O Box 100360 Anchorage, AK 99510-0360 Dear Ms Billingsley: The Commission is compiling statewide drilling statistics for 1993. Attached is a list of outstanding Permits to Drill issued to your engineering group (permits for which no form 10-407 has been received by this office). Please review this list to determine if any of the wells were drilled in 1993. If so, please note the well name, total measured depth, and class (development, service or exploratory). If any wells were drilling as of 12/31/93, estimate the depth at 12:00 midnight. We would appreciate your reply by the end of January if possible. Thank you for your cooperation with this project, if ! may be of any assistance, please call me at 279-1433. Yours very truly, Robed P Crandall Sr Petr Geologist encl jo/A:RPC:~lrlstats .1/04/94 OPERATOR ARCO ALASKA INC ARCO ALASKA INC ARCO ALASKA INC ARCO ALASKA INC ARCO ALASKA INa ARCO ALASKA INC ARCO ALASKA INC ARCO ALASKA INC ARCO ALASKA INC ARCO ALASKA INC ARCO .ALASKA INC ARCO ALASKA INC ARCO ALASKA INC ARCO ALASKA INC ARCO anAs tf3~ INC ARCO ALASKA INC ARCO ALASKA INC ALASKA WELLS BY ARCO PERMIT 93-0166-0 93-0152-0 93-0151-0 · 93-0163-0 93-0144-0 93-0188-0 93-0179-0 93-0169-0 93-0104-0 93-0189-0 93-0174-0 93-0175-0 93-0187-0 93-0195-0 93~0196-0 93-0193-0 92-0040-0 WELL NAME KUPAR, UK RIV UNIT KUPARUK RIV UNIT KUPARUK RIV UIqlT K[IPARUK RIV UNIT KUPARUK RIV UNIT KUt>ARUK RIV UNIT KUPARUK R. IVUNIT KII~ARUK ~IV IINIT KIIPARUK RIV UNIT KUPAR£$K RIV LINIT KUPARIIK RIV I~IT KISPARI3K RIV UNIT KUPARUK RIV OT~IT KU~ARUK RIV UNIT KUPARUK RIV UI~IT KISPARUK RIV UNIT KUPARUK RIV UNIT 2A-18 2A-19 2A-20 2A-22 2A-24 2E-04 2E-05 2E-06 2E-07 2E-08 2E-17 2E-18 3M-23 3M-24 3M-25 3M-26 3R-16 ARCO Alaska, Inc. Date' November 23, 1993 Transmittal #: 8940 RETURN TO: ARCO Alaska, Inc. Attn: Sarah Bowen Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted below are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 2A-19 Directional Survey 11-04-93 93515 2A-20 Directional Survey 11-04-93 93516 Receipt ~/t.~r//,~, ~,//"~~' Date Acknowledged: ' DISTRIBUTION: DAM ;~,~State :of?Ala~k~a-:(2,.copies) - ..~. ,~;. ~-'~,;~ . :, . l'~O'~ ?- 9 ..~,-. {jif & Gas Cons. ARCO Alaska, Inc. Date: November 19, 1993 Transmittal #: 8929 RETURN TO: ARCO Alaska, Inc. ATTN: Sarah Bowen Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted below are the following Cased Hole items. receipt and return one signed copy of this transmittal. /2A-19 ,/Cement Evaluation Log 11-04-93 ~.2A-19 -"Cement Bond Log CBT 11-04-93 ,~2A-20 ,~;ement Evaluation Log 11-04-935'~¢ 2A-20 ¢Cement Bond Log CBT 11-04-93 ~/2A-24 ,/Cement Evaluation Log 11-08-93 X,2A-24 ¢Cement Bond Log CBT 11-08-93 Drilling ;Si-~t*~'!!~-f~'!~i';S~(~ e pi a~NSK Please acknowledge 8500-9676 8500-9652 9900-11431 9900-11407 7600-9570 7600-9544 ALASKA OIL AND GAS CONSERVATION COMMISSION October 11, 1993 A. W. McBride Area Drilling Engineer ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 LWALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Re: Kuparuk River Unit 2A-20 ARCO Alaska, Inc. Permit No: 93-151 Sur. Loc. 696'FSL, 53'FEL, Sec. 14, TllN, R8E, UM Btmhole Loc. l196'FNL, 1724'FWL, Sec. 22, TllN, R8E, UM Dear Mr. McBride: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~) pdnted on recycled paper b y t':. ~. '--, STATE OF ALASKA '-' ALA_ .,-t OIL AND GAS CONSERVATION COMMIS~ . N PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill X Redrill [] lb Type of Well Exploratory [-] Stratigraphic Test [] Development Oil X Re-Entry ~] Deepen [] Service ~ Development Gas [] Single Zone X Multiple Zone [] 2.. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 135', Pad 94' GL feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 ADL 25571, ALK 2669 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.O25) 696' FSL, 53' FEL, SEC. 14, T11N, RSE, UM Kuparuk River Unit Statewide At top of productive interval (@ TARGET ) 8. Well number Number 1145' FNL, 1961' FWL, Sec. 22, T11N, R8E, UM 2A-20 #U-630610 At total depth 9. Approximate spud date Amount 1196' FNL, 1724' FWL, Sec. 22, T11N, RSE, UM 1 0/20/93 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 2A-08 11535' MD 3556' ~ TD feet 20' ~ 500' MD feet 2560 6129' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 500 feet Maximum hole angle 66.8 1 o Maximumsudace 1708 psig At total depth (TVD) 3 141 psig 18. Casing I~ogram Setting Depth size Specifications Top Bottom Quantity of cement Hole Casin~l Weicjht Grade Couplincj Length MD TVD MD TVD {include sta~le dataI 24" 16" 62.5# H-40 Weld 80' 41' 41' 121' 121' _+200 CF 12.25" 9.625" 47.0# L-80 BTC 2959' 41' 41' 3000' 2363' 340 Sx Arcticset III & HF-ERW 740 Sx Class G 12.25" 9.625" 36.0# J-55 BTC 1325' 3000' 2363' 4325' 2885' HF-ERW 8.5" 7" 26.0# L-80 BTCMOr' 11494' 41' 41' 11535' 6129' 160 Sx ClassG HF-ERW Top 500' above Kuparuk 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Structural Conductor Surface IntermediateS E P 2 9 199, Production Liner Alaska 0ii & Gas Cons. C0mrnisst0~ Perforation depth: measuredAnchorage true vertical 20. Attachments Filing fee [] Property plat [] BOPSketch X Diverter Sketch X Drilling program X Drilling fluid program X Time vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements X 21. I hereby certify that the foregoi.ng-is trUe and correct to the best of my knowledge Signed /~ '~ ~ ~'~.'~4,J ~l,~r~{~(~ Title Area Drilling Engineer Date (:~'/,,~.~/~.~ Commission Use Only Permit Number I APl number I Approval date I See cover letter for ~ ' ,,/.b'"/ 50-/O,~ --- -.~O / ~'~' ,,,/~t ...//.... ~ other recluirements Conditions of approval Samples required [] Yes ~] No Mud log required [--} Yes [] No Hydrogen sulfidemeasures ~ Yes J~ No Directional surveyrequired ,~ Yes ~] No Required working pressure for BOPE [~ 2M [] 3M E] 5M ~--~ 10M D 15M Other: Or, Dina! S!g~,ad By by order of Approved by ' ,.r-j;~,tjd,.~ ~_' __ ~^~.__= _~©~o/rl. ~_- _ -. ~ . Commissioner the commission Date /(__..) '"//--~' ~' I~nrm lC~-4¢il i:l¢~v 7-D4-Rcl .~l ~hrnit in nlir,~t¢~ , , , 10. 11. 12. 13. 14. 15. 16. 17. 18. GENERAL DRILLING PROCEDURE KUPARUK RIVER FIELD 2A-20 Move in and rig up Parker #245. Install diverter system. Drill 12-1/4" hole to 9-5/8" surface casing point (4325')according to directional plan. Run and cement 9-5/8" casing. Install and test BOPE. Test casing to 2000 psi. Drill out cement and 10° of new hole. Perform leak off test to 12.5 ppg EMW. Drill 8-1/2" hole to total depth (11,535') according to directional plan. Run open hole evaluation logs or LWD tools as needed. Run and cement 7" casing. (If significant hydrocarbon zones are present above the Kuparuk, sufficient cement will be pumped for isolation in accordance with Rule 20 AAC 25.030. Alternatively, if significant hydrocarbon zones occur within 200' TVD of the surface casing shoe, cement will be down squeezed in the annular space between the surface and production casing after the primary cement job is completed.) Pressure test to 3500 psi. ND BOPE. NU tubinghead & full opening valve for cased hole logging. Secure well and release rig. Run cased hole cement evaluation. ND full opening valve & NU tree assembly. Move in and rig up Nordic #1. Install and test BOPE. Perforate and run completion assembly, set and test packer. ND BOPE and install production tree. Shut in and secure well. Clean location and release rig. RECEIVED SEP 2 9 199; Alaska Oil & Gas Cons. CommissiOn ~,nchorage DRILLING FLUID PROGRAM Well 2A-20 Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids Spud to 9-5/8" surface casing 9.0-10.0 15-25 15-35 50-80' 5-15 15-40 10-12 9.5-10 +10% Drill out to weight up 8.4-9.6 5-15 5-8 30-40 2-4 4-8 8-10 9.5-10 4-7% Drilling Fluid System: Tandem Brandt Shale Shakers Triple Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuges, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes: Weight up to TD 10.8 10-18 8-12 35-50 2-4 4-8 4-5 thru Kuparuk 9.5-10 <12% Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur before a surface pressure of 1708 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3000 psi. The nearest well to 2A-20 is 2A-08. As designed, the minimum distance between the two wells would be 20' @ 500' MD. The wells would diverge from that point. Incidental fluids developed from drilling operations will be hauled to the nearest permitted disposal well or will be pumped down the surface/production casing annulus of the last well drilled. That annulus will be left with a non-freezing fluid during any extended shut down (> 4hr) in pumping operations. The annulus will be sealed with 225 sx of cement followed by arctic pack upon completion of fluid pumping. *Spud mud should be adjusted to a FV between 50-80 sec/qt to drill gravel beds. RECEIVED S E P 9 199 Alaska Oil & Gas Cons. commission Anchorage iCreoted by : jones :For: M ELLIS iDate plotted : 28--Sep-93 ;.Plot Reference is 20 Version ¢Coordinotes ore in feet reference slot #20. True Verf. ical Depths ore reference wellhead. Baker Hughes INTEQ A CO ALASKA, Inc. · Structure : Pad 2A Well : 20 '. Field : Kuparuk River Unit Location : North Slope, Alaska _ . 9000 8500 8000 7500 I I I I [ I i i ITD LOCATION: I 1196' FNL, 1724' FWL SEC. 22. T11N, RBE 70-00 6500 6000 <-- West 5500 5P~0'3 4500 4000 3500 ~000 2500 2000 1500 100C) I I ~ I [ I I I [ I I I I I [ I I I I I I I TARGET LOCATION: I 1145' FNL, i961' FWL SEC.22,T1 1N. RBE TARGET r'4D=5840 TMD= 11158 DEP=8742 SOUTH 1841 WEST 8546 ISURFACE LOCATION: 696' FSL, 55' FEL SEC. 14. T11Fl, R8E Scale 1 :250.00 500 0 500 I I I I 500 _ _2000 25c~ S 77.84 DEG W 8742' (TO TARGET) KOP TVD=500 TMD=500 DEP=O 6.00 12.00 18.00 BUILD 3 DEG 24.00 50.00 B/ PERMAFROST TVD=1490 TMD=1541 DEP=277 36.00 T/ UGNU SNDS TVD=1585 TMD=1654 DEP=538 '..42_00 '"~'~0.~0,.0~^ T/ W SAK St,IDS TVD=2155 IfaD=2564 DEP=1011 .~OC TVD=2256 TMD=2727 DEP=1155 B,'" W SAK SNDS TVD=2685 T,".~D=3817 DEP=2160  9 5/'8" CSG PT 'FVD=2885 TMD=4525 DEP=2627 ~~85 TMD=4853 DEP=3094 5OO 0 (-- 1aa0 :D- I 150.c) I V TARGET ANGLE 40 DEG MAXIMUM ANGLE _ gOD _ _ 1550_ _ 1800_ _ 2250_ - 2700_ _ 5150_ _ 3600_ _ 4050_ _ _ 4950_ 540O 585O _ 6300 _ R CEIVED S E P 2 9 199 Alaska Oil & Gas Cons. Commission ~ Anchorago · BEGIN ANGLE DROP 'i~J0=5048 TMD=9818 DE 66.6020.00 .58.00 DROP 2 DEC- / 100" '""% 54.00 50.00 '%'. 46.00 TARGET (EOD) TVD=5840 TMD=llI58 DEP=8742_.~___~, 2.00 i3/ KUP SNDS TVD=5976 THD=11.356 DEP=8856""~x~ TD / ?" cgo PT TVD=6129 TMD=lI536 DEP=8985 I I I I I I I I I I I 22150 ! ! ~ I I I I 450 0 450 gDO 1350 180-32700 3150 3500 Scale 1 : 225.00 Vertical Section on 257.84 azimuth wilh reference 0.00 N. 0.00 E from slot ~20 4050 4500 4950 5400 5850 6300 67 0 7200 8100 8 50 go 0 9450 450 400 I I I ARCO ALASKA, Inc. Structure : Pad 2A Field : Kuparuk River Unit 350 300 Well : 19 / 20 Locoflon : Norfh Slope, ,, Wesf ~co,~ ~ · ~o.oo 250 200 150 100 50 0 I I I I 1500 ~700 3100 1 O0 1700 9OO iO0 ~0 300 85O _800 _750 A _~oo i _650 0 1 t-- ::- _600 550 ~- .. _500 o casing Design / Cement Calculations 29-Sep-93 Well Number: Surface Csg MD: Surface Csg TVD: Production Csg MD: Production Csg TVD: Top of West Sak, TMD: Top of Target, TMD: Top of Target, TVD: Estimated Pressure: Surface Casing Choice: Production Csg Choice: Production Casing Frac. Pressure 2A-20 4,325 ft 2,885 ft 11,535 ft 6,129 ft 2,563 ft 11,1 58 ft 5,840 ft 3141 psi ** See Page 4 For Casing Choices 3,500 psi Maximum anticipated surface pressure Estimated BH pressure at top of target zone TVD surface shoe = {(13.5'0.052)-0.11}*TVDshoe =b Estimated Pressure= Top of Target, TVD = Overbalance, psi= Anticipated Mud Weight =1 2,885 ft 1,708 psiJ 3,141.0 ppg 5,84O ft 150 psi 10.8 ppg J Design lead bottom 500 ft above the Top of West Sak = 2,063 ft Annular area = 0.3132 cf/If Lead length * Annulus area = 646 cf Excess factor = 15% Cement volume required = 743 cf Yield for Permafrost Cmt = 2.17 Cement volume required =1 340 sxJ Surface tail' TMD shoe = 4,325 ft (surface TD - 500' above West Sak) * (Annulus area) = 708 cf Length of cmt inside csg = 80 ft Internal csg volume = 0.4110 cf/If Cmt required in casing = 33 cf Total cmt = 741 cf Excess factor = 15% Cement volume required = 853 cf Yield for Class G cmt = 1.15 Cement volume required =b 740 sxJ REEEIVED S E P 2 9 199 Alaska Oil & Gas Cons. Commission Anchorage Casing Design / Cement Calculations Production tail: 29-Sep-93 TMD = 11,535 ft Top of Target, TMD = 11,1 58 ft Want TOC 500' above top of target = 10,658 ft Annulus area (9" Hole) = 0.1745 (TD-TOC)*Annulus area = 153 cf Length of cmt wanted in csg = 80 ft Internal csg volume = 0.2148 Cmt required in casing = 17 cf Total cmt = 170 cf Excess factor = 15% Cement volume required = 196 cf Yield for Class G cmt = 1.23 Cement volume required =[ 160 sxJ TENSION - Minimum Design Factors are: T(pb)=1.5 and T(js)=1.8 Surface (Pipe Body): Casing Rated For: Tension (Pipe Body) = Dead Wt in Air- Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Pipe Body) = Design Factor =[ Surface (Joint Strength): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Joint Strength) = Design Factor =[ Production (Pipe Body): Tension (Pipe Body) = Dead Wt in Air- Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft)= Dead Wt in Air = Buoyancy = Tension (Pipe Body)= Design Factor =[ Production (Joint Strength): Tension (Pipe Body) = Dead Wt in Air- Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud SEP ?. 9 t993 Alaska 0ii & Gas Cons. (;or~¢ss~°~ Anchorage 2 Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Joint Strength) = Design Factor =[ 1086000 lb 4,325 ft 47.O0 Ib/ft 203275.0 lb 33044.0 lb 170231.0 lb 6.41 1161000 lb 4,325 ft 47.00 Ib/ft 203275.0 lb 33044.0 lb 170231.0 lb 604000 lb 11,535 ft 26.00 Ib/ft 299910.0 lb 49019.0 lb 25O891.0 lb 2.41 667000 lb 11,535 ft 26.00 Ib/ft 299910.0 lb 49019.0 lb 25O891.0 lb 2.7[ Casing Design/Cement Calculations BURST- Minimum Design Factor = 1.1 Surface Casing: Burst = Maximum surface pressure Casing Rated For: Max Shut-in Pres = Design Factor =[ Production Csg: 1. Design Case - Tubing leak while well is SI Inside pres=Csg Frac pres(3500 psi)+Mud Wt*.052*TVD Outside Pres=Backup Gradient (8.gppg *0.052*TVD) Net Pressure = Pressure inside-Pressure outside Design Factor = Rating / Net Pressure COLLAPSE - Minimum Design Factor = 1.0 Surface Casing 1. Design Case - Lost circulation and Fluid level drops to 2000' TVD with 9.0 # Mud 2. Ext. Pres=Mud Wt*0.052*TVD-(2000'TVD of 9# Mud) Production Csg 1. Worst Case - Full evacuation of casing 2. Mud weight on outside - Mud Wt * 0.052 * TVD Casing Rated For: Inside pressure Outside Pressure Net Pressure Design Factor Casing Rated For: Mud Gradient = Ext. Pres. @ Bottom = Design Factor =[ Casing Rated For: Mud Gradient = Ext. Pres. @ Bottom = Design Factor =1 29-Sep-93 6870 psi 1707.9 psi 4.0J 7240 psi 6954 psi 2837 psi 4117 psi 1 .el 4750 psi 0.564 Ib/ft 690 psi 6.91 5410 psi 0.564 Ib/ft 3454 psi 1 .Si S E P ~ 9 199] Alaska 0JJ & Gas Cons. Commisslor~ Anchorage Casing Design / Cement Calculations 29-Sep-93 Surface Casing Choices OD ID Ib/ft Grade I 9.625 8.681 47 L-80 2 9.625 8.835 40 L-80 3 9.625 8.921 36 J-55 4 10.750 9.950 45.5 J-55 Metal X-Section Jt Strength Body Strength Collapse Burst 13.5724 sq. in. 1161000 lb 1086000 lb 4750 psi 6870 psi 11.4538 sq. in. 979000 lb 91 6000 lb 3090 psi 5750 psi 10.2545 sq. in. 639000 lb 564000 lb 2020 psi 3520 psi 13.0062 sq. in. 931000 lb 715000 lb 2090 psi 3580 psi OD ID I 7.000 6.276 Production Casing Choices I b/ft Grade Metal X-Section Jt Strength 26 L-80 7.5491 sq. in. 667000 lb Body Strength 604000 lb Collapse 5410 psi Burst 7240 psi s E P 2 9 ~993 Alaska Oil & Gas Cons. Commission Anchorage ~'~' KUPARUK RIVER I.r 20" DIVERTER SCHEMATIC 6 3 I_--I I DO NOT SHUT IN DIVERTER AND VALVES AT SAME TIME UNDER ANY CIRCUMSTANCES. MAINTENANCE & OPERATION . UPON INmAL INSTALLATION, CLOSE PREVENTER AND VERIFY THAT VALVE OPENS PROPERLY. CLOSE ANNULAR PREVENTER IN THE EVENTTHAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS De1 eCi U.D. OPEN APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION. ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(b) 1. 16'~ 2. SUP-ON WELD STARTING HEAD 3. DIVERTER ASSEMBLY WiTH ONE 2-1/16'- 2(X)0 PSI BALL VALVE 4. 20' -2000 PSI DRILLING SPOOLWn'H TWO 10' OUTLETS. 5. 10' HCR BALL VALVES WITH 10' DIVEFITER UNES, A SINGLE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. VALVES CAN BE REMOTELY CON'I'ROi I ;=r3 TO ACHIEVE DOWNWIND DIVERSION . ooo,s, RE( EIVED S E P 2 9 1993 Alask;t Oil & Gas Cons. Commission Anchorage h 7 4 3 t I 2 13 518" 500 iPSI BOP STACK IS 45 SECONDS CLOSING Tilde AND 1200 PSI REMAINING PRESSURE. 1. FILL BOP b'F'ACI( AND ~~ ~ WA~. 2. CHECK THAT ALL HO~),.IX3~'~ ~IEW~ ARE FULLY RETRAC'r~3. PREDETERMINE DEFTH THAT'I--=ST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREW~ IN HEAD. 3. CLOSE ANNIJI.AR F~.EV~NTER AND CHOKES AND BYPAS~ VALVES 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10MINUTES. INCREASE ~~ ~ ~ AND ~ ~ 10 MINUI--~. ~ m=n TO ZEI=IO PSI._ 5. OPEN ANNULAR PREVENTOR AND MANUAL KILL AND CHOKE IINE VALVES. 6. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE LINES. CONTINUE TESTING ALL VALVES, UNES, AND CHOKES WITH A 250 PSI LOW AND 3(Xi0 PSI HIGI-L TEST ~ IN STEP 4. DO NOT PRESSURE TEST 8. OPEN TOP PIPE RAMS AND CLOSE BO'I"rOM PIPE RAMS. TEST BOTTOM RAMS TO 250 PSI AND 3000 PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BUND RAMS AND TEST TO 3(X)O PSI FOR 10 MINUTES. BLEED"lO ZERO PSI. 10. OPEN BUND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND UNES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING PoSmON. 12. '~EST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRIllING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DALLY. 1. 16' - 2000 ~ STARTING HEAD ~_ 11" - 3000 P~ CA, NC HEAD 3. 11' - 3000 !:~ X 13-51~ - .~KI00 ~ SPACER SPOOL 4. 13..5/8' - ~ P~ PIPE RAlVlS 5. 13-5/6- - ~_~J~__ PSI.DRLQ ~ WI CHOKE AND K]U. UNES 6. 13-g8" - 5(XX) PSI DOUBLE RAM W/ 7. 13-5~8' - 5000 PSI ANNUl. AR R'EEEJVED S E P 2 9 -1995 Alaska 0JJ & Gas Cons. Commiss~u,' Anchorage ** CHECK LIST FOR NEW WELL PERMITS ** I"m . ( 1 ) Fee (3) ~d_min . '9~thru 10. [10 g 13] 12. C4) Casg <J~ [g/~,~ 13.14. [14 thru 22] 15. E23 thru 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. (5) BOPE Company 1. Is permit fee attached ............................................... 2. Is well to be located in a defined pool .............................. 3. Is well located proper distance from property line ................... 4.' Is well located proper distance from other wells ..................... 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated & is wellbore plat included ................... 7. Is operator the only affected party ........ , ......................... 8. Can permit be approved before 15-day wait ............................ Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease ntrnber appropriate .......................................... Does well have a unique name & number ................................ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings Will cement cover all known productive horizons ..................... / Lease 8 We1 1 ~ ,~ .2~.S',,y',?/~' .~.~ YES NO REMARKS ! Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... ~_ Is old wellbore abandonment procedure included on 10-403 ............. ~---/-~4 Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~ psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... [29 thru 31] 30. 31. (7) Contact 32. [32] C8) Addl 33. geology' en9 i neet i n9: DWO~ NTH RP~_~_~__TAB" rev 6/93 jo/6.011 FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone number of contact to supply weekly progress data ...... Additional requirements ............................................. INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE Additional remarks' UM ~ MERIDIAN' SM WELL TYPE' E xp/~y~ '~ Redri 11 Inj Rev 0 'TZ ~0 ~-~ Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simp!ify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ALASKA COMPUTING CENTER ~m~mmmmmmmmmm--mmmm~mmm~mmm~..~ * ....... SCHLUMBERGER ****************************** COMPANY NAME : ARCO ALASKA, INC, wELL NAME : 2A-20 FIELD NA~E : KUPARUK RI~ER BOROUGH : NORTH SLOPE STATE : ALASKA API NURSER ~ 50-103-20196-00 15 Ta~e Verification [,fstino chlumberger Alaska Co~putlnq Center 24-AUG-1994 16:06 **** REEL NEADEN SERVICE NAME : EDIT DATE : 94/08/~2 ORIGIN : FLIC REEl. NAME : 93497 CONTINUATION # PREVIOUS REEL CO~UE~T : AkCO ALASKA, I~C.,KUPARUK RI~ER UN~T, 2A-20,50-103-20196-00 **** TaPE NEADER **** SERVICE NAME : EDIT DATE : ~4/08/22 O~IGIN : FbIC TAPE NA~E : 93497 CONTINUATION # : ~ PREVIOD$ TAPE : CO~ENT : ARCO ALASKA, INC.,KUPARUK RIVER UNIT, 2A-20,50-130-20196-00 TAPE HEADER KUP~R~]K RIVER MWD/MAD LOGS # WEb[, NA~E: AP1 NUMBER: OPERATOR: LOGGI~G COMPANY: TaPE CREATION DATE: JOB DATa BIT RUN 1 ST. A~.OUR NICOLS JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWnShIP: RANGE: FNb: FSL: FEL: FWL: ELEVaTION(ET FROM KELLY BUSHING: DERRICK GROU~D LEVEL: WELL CASING RECORD STRING SI,lNG' ' R 2A"20 501032019600 aRCO ALASKA, INC~ SCHLUMBERGER WELL SERVICES 20-DEC-93 BIT RUN 2 9~497 ST, AMOUR NICOLS BIT RUN 3 14 lIN 8E 696 53 135,00 135,00 94,00 OPEN ~OLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) '''''8.500 ...... '' ';~;''' '''';1416 .... 0 PAGE: Tame Verification I, istino 24-AUG-1994 16;06 ;CblUmberger Alaska Computi~%q Center 3RD SIRING PR~[)UCTI~N STRING R~S RP TU BIT: 68 q~ FT ~DS AP TO SIT: ~2~99 FT RES TO ~IT: 65.73 FT DEN TO BIT; 130 30 FT DPII,bED INTERVAL; 4~85-~0913 FI RGS RP TO BIT: ~9.37 FT NOS RP TO SIT: 4~.86 FT RES TO BIT: 16.20 FT GR TO BIT: 26 6~ FT DEN TO ~IT: 4~.17 FT NEUT TO BIT: 50.15 FT DRILLED INTERVAL: 10913 - 11545 FT WASHDO~i INTERVAS: ~0803 - 109~3 FT HOLE AN~LE AT TD = 45.5 DEG.~ l!545 FT. aAXI~iU~i HObE AI~GLE = 67.91 DEG.t 7890 FT TD WELb ~ 07:45 OCT.23, 1993 LIS FORMAT DATA 5IS FORMAT DATA PAGE: **** FILE ~IEADFR F!LF NAME : EDIT ,001 VFRSIO~i : OOI. COI DATE : 04/08/22 MAX REC SIZE FILF TYPE FILF HEADER F!LF Nlt~6ER: I EDITED ~ERGED aWD Dept~ shifted and cllpoed curves; all bit, runs merued. D~P~ti I~C~E~E~!T: o'500¢) # FILF SUMMARY LDWG TOO[., CODE BASFLIN~ CURVE FO~ SHIFTS1 START.DEPTH 1.1 30.0 11518.0 STOP DEPTH 4110.0 IS Tame Yeriflcatlon I.,is'tinq chlumberger AlasKa ComputlnQ Center 24-AUG-1994 16:06 CURVE 6HIFT DATA (iqEASURED DEPTH) # .......... EQUIVALENT UNSHIFTED DFPTH .......... ~ASELINE DEPTH "ii ......... .B~ ,0 ~8B83.5 11! .0 11180.5 11116.0 II110.~ 11047,6 11041.5 11021.0 11015.0 !0985,n 10979.0 10903,0 10898.0 10840,0 10837,5 !0~0q,5 10809,0 10789.0 10787.0 1.0765,5 10765,5 10690,5 10688,0 10666,5 10666,5 10631 5 1063~.0 10600i5 10598,5 ~055@ 0 10558.0 10381 0 10379.5 10325,0 10325,0 ~00.0 100.0 MFR~ED DATA SOURC~ LDWG ~ODL CODE BIT RUN NO, MERGE TOP ........... . ................... 1 41,10,0 CDN ! 4110,0 CD~ ~ 10913~0 CD~ ~ 109~3,0 1,09 3,0 10913,0 11545,0 11545.0 Tile DEPT~ ADJUSTMENTS SNOWN ABOVE REFLECT MWD GR TO N CET/GR OF 04-NOV-199]~ AL[, OTHER CURVES ~ERE CARRIED WITH THE OR SHIFT' THE VERY ENMANCED QRO PROCESSESSED ~ESiSTIVI~Y DATA ~ITM A ~' AVERAGE IS CONTAINED IN THIS FILE, $ LIS FORMAT DATA PAGEt DATA FORMAT SPECI~'ICATTON ** SET TYPE - 64EB ** TYPE REPR C~DE V,AhUE I 66 0 2 66 0 IS Tape Verlflcation ListlnO cblumberqer AlasKa Computfn~ Center 24-AbG-1994 16:06 5 66 6 73 7 65 8 68 0,5 9 65 FT 11 66 15 i~ 68 13 66 0 14 65 15 66 68 16 66 0 66 0 ** SET TYPE - CHAN ** N ~F SFR. UNIT SERVICE APl API AP1 API FILE NUMB S ZE REPR P 0CE$$ IO ORDE~ # bOG TYPE CLASS ~OD NUMB SAMP ELEM CODE (HEX) DEP~ FT 619113 O0 000 O0 0 1 I I 4 68 0000000000 RMOB MWD G/C3 619113 O0 000 O0 0 I 1 1 4 68 0000000000 D~HO MWD G/C3 61011.3 O0 000 O0 0 i I I 4 68 0000000000 P~F MWD BN/E 619113 O0 000 O0 0 I I I 4 68 0000000000 C~LN ~D IN 619113 O0 000 O0 0 I ~ 1 4 68 0000000000 NPHI ~WD PU-S 6191~3 O0 000 O0 0 1 1 I 4 68 0000000000 RA ~'D O~NM 61911,3 O0 000 O0 0 I 1 1 4 68 0000000000 RP MWD O~M~ 619113 O0 000 O0 0 I 1 1 4 68 0000000000 D~R MWD OMM~ 6~9113 O0 000 O0 0 I ~ 1 4 68 0000000000 VRP MWD OHM~ 61911.3 O0 000 O0 0 i 1 1 4 68 0000000000 VRA ~WD OMM~ 6191~3 O0 000 O0 0 1 I. I 4 68 0000000000 ROP ~WD FPHR 619113 O0 000 O0 0 I I. 1 4 68 0000000000 GP ~D GAPI 619113 O0 000 O0 0 I ) 1 4 68 0000000000 NCNT ~WD CPS 6~9il. 3 O0 000 O0 0 I I 1 4 68 0000000000 FCNT ~D CPS 619113 O0 000 O0 0 1 1 1 4 68 0000000000 YET M~D HR 619113 O0 000 O0 0 I I 1 4 68 0000000000 GRCH CET GAPI 6i~113 O0 000 O0 0 I I 1 4 68 0000000000 ** DAT~ ** DEPT 1~.539,500 RHOB,MWD -999.250 DR~O.MWD -999.~50 PEF.MWD -999'250 C~LN'~WD -999.250 NPHI.~WD -999.250 ~A,MWD -999,250 RP.MWD -999,250 DEfaMeD -999.250 VRP.SWD -999.~50 V~A,MWD 999.250 ROP.MWD G~ M~D -999.250 NCNT.~WD 1.1544.500 FCNT.MWD ~999.~50 FET.~WD -9991250 G~C~'~ T C~ -999 250 IS ?ape Verification Listino chlun, berqer AlasKa Computino Center 24-AUG-1994 16:06 DEPT. 11000°000 PHOB.~WD 2 380 DRH0.MWD C~LN,Mwn 8.530 NPMI.i~WD 4~:900 DE~.~WD 1.578 VRP.SWD 1.712 V~A.~4WD G~.~wD i23.51i ~CNT.,~W~ 11006.500 FCNT,~WD GRC~'CET 79.034 D~PT. I0000.000 RHOB.~WD 2.351 DRHO.gWD CAL~.MWD 8.511 NPWI.NWD 41.300 RA.MWD ~E~.~wD 5.016 V~P.~iWD -999.~50 ¥~Ao~WD G~.~mD 118.958 NCNT.~WD 10000.500 FCNT.MWD G~CH.CET 7~.i4i DFPT. 9000.OOU ~HOB.MWD 2.269 DRHO.MWD C~LN ~WD 8.591 NPHI,MWD $4.900 RA.MWD DE~MWD 2.970 VRP.~WD -999.250 VRA.MWD GP.~WD 94.979 r~CNT.~WD 9000.500 FCNT.MWD G~C~.CET -999.256 DEPT 8000.000 RHOB.~WD 2 366 DRMG.MWD CALN'~D ~.588 ~P~I.~WD 37~300 RA.~WD DE~'~WD 2.428 VRP.~WD -999 250 VRA.~WD G~WD 125.275 NCN~.~WD 8000~ 500 FCNT.MWD G~Cg. CET -999.250 DEPT. 7000.000 ~HOB.MWD ~.344 DRHO.~WD CALN.~WD 8.b34 NPHI.i~WD 34.]00 RA.MWD DE~.~WD 3.409 V~P.MwD -999.250 YRA.MWD GR,~D i~5,b76 NCNT.MWD 7000.500 FCNT.MWD GRCH.CET -999.250 DEPT 6000,000 RHOB,MWD ~.~1 DRHO,MWD CALN:MWD 8.609 NPHI.~WD 3~,vvO RA.MWD DE~.M~O 4.402 VRP.i~WD -999,250 VRA.MWD G~,~D 83.106 NCNT.i~WD 6000.500 FCNT.MWD CET -999 250 G~C~. -0.003 X.487 1.622 5.303 -0.00! 4.341 -999.250 5.575 2.947 -999.250 6.513 0,015 2,250 -999.250 6.080 0,006 3,364 -999.~5-0 6,351 0 004 4 976 -999 ~50 6 ~36 PEF.MwD RP.MWD ROP.MWD FET.~WD PEF.~wD RP.~WD ROP.MWD FET.MWD PEF.MWD RP.MWD ROP.NWD FET.MwD PEF.MWD RP,~WD ROP.~wD FET.~WD PEF.NWD RP.NWD ROP.MWD FET.~WD PEF.~WD RP.~WD ROP.NWD FET,~WD E~.~WD 3.4~I VRP.~WD -999.250 VRA.MWD -999 250 ROP.MWD GP.MWD 100.296 NCNT.MWD 5000.500 FCNT.MWD 5,~455 FET.MWD G~CM.CET -999.250 DEPT 403'?.000 RMO~.NWD -999.250 DRHO.MWD -999.~50 PEF,NWD C~LN:~W~ -999.25~ ~P,I.~WD -999,250 RA.~WD -999 50 RP,,WD DEP.E~,D -999.250 VRPoNWD -999.250 VRA'NWD -999:~50 ROP.~WD ~ ~D -999.250 NC~T.f~WD 40~$.000 FC. 'I MWDN~'. -999.~50 FET.~WD. GRCM:CET -999.250 END OF DATA PAGE: !446 654 4~ 049 .. 369 4.216 5 242 206i927 0 806 3,865 2,983 230.761 0.402 3,569 2,565 216.847 0,367 3,057 0,309 3,048 4,~10 3703, 13 ,444 2*594 3,439 533'154 0"219 -999 250 -999 250 -999 250 -999 250 Tape Ver~.f~.cati. on Listing :hlUmberger AlasKa Computing Center 24-AUG-1994 16:06 PAGE: 6 **** FILE TRAILER **** FILE NA~E : EDIT ,001 SERVICE : FLIC VERSION : 001C01 DATE : 94108/22 MAX REC SIZE : 1024 FILE TYPE ~ LO LAST FILE : **** FILM HEADER **** FILM NA~g : EQIT .002 SERVICE : FLIC VERSION : DATE : 94/08/22 MAX REC SIZE : FILE TYPE : LO LAST FILE FILF HEADER FILF NUMBER 2 Rani ~4AD Curves and log header data for each bit run in separate BIT RUN NUMBER; 1 DEPTH I ~CRE~EMT: 0,5000 LDWG TOOL CODE START DEPTH STOP DEPTH .... -..--..... D 4 I0,. 10913,0 CD~ 4110,0 10913,0 LOG HEADER DATA DATE LOGGE~: 23-0CT-93 SUFTWAPE: SURFACE SOFTWARE VERSION: FAST 2,4 DO~MHOLM SOFTWARE VERSION: V4~0C DATA TYPE (MEMORY or REAL-TI~E): ME~O~Y TD DRiP,bMR (FT): 11545,0 TOP LOG INTERVAb (FT): 4057 4 .u.~,,.~ LOG iNTERVAL (FT): 11~4:0 ~IT ROTATING SPEFD ~O!,,E: I~3C~,INATION (DEG) h AXIM!],~ ANGLE: 67.9 TOOL STRI~G (TOP TO BOTTOm) VEt~DOn TOOL CODE TOOL TYPE RESISTIVITY ~',~EOTRON/POROSITY RGS055 NOS057 ~iles. [$ Tape YerlfIcation Listing .-hlumberger AlasKa Computing Center 24-AUG-1994 16:06 PAGE: ~GREHOSE AND CASING DATA OPEN HOLE bit SIZE (IN): DRILLERS CASING DEPTH BOREMOLE CONDITIO~' MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY MUD CHLORIDES F!;U!D LOSS MAXISUM RECORDED TEgPERATURE (DEGF): RESISTIVITY (OH~) AT TESPERATURE (DEGF): ~UD AT M~ASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE MUD FILTRATE AT MUD CAKE AT (MT): 8 5O0 4{67,0 ~EUTROM TOOL ~ATRIX: MATRIX DENSITY: HOLE CORRECTION (TN): I0,50 150.0 2,070 2,640 # SANDSTONE 2.65 TOOL STANDOFF EmP FREQUENCY ****~* RUN ~ AND 2 *~*~***~**** DRILLED INTERVAL: RUN i 4185-10913 FT DRILLED INTERVAL: RUN 2 10913-I1545 FT HOLE ANGLE AT TD:45~5 DEL ~ ~545 FT ~A×!MU~ HOLE ANGLE - 67,91 DEL ~ 7890,00 FT TD ~EL5 9 07:45 OCT 23, ~993 $ LIS FORMAT DATA 77.0 58.0 DATA FORMAT SPECIFICATIUN RECORD SET TYPE - 64EB TYPE REPR CODE VALU I 66 0 2 66 0 3 73 64 4 66 5 66 7 65 8 68 0,5 iS Tape verf. flcatlon Llstinq 24-AUG-t994 16:06 PAGE: 8 :blUmberger AlasKa Computinq Center 9 1! i3 16 0 66 16 66 0 65 FT 66 68 66 66 I N A M ~ DEPT DPH! Lwf DRHO PEF LWJ DCAL TNpH ATR PSR L~I DER LWl ROPF GR ~$ SET TYPE ERV UNIT SERV ID ORDE FT 6~91 G/C3 6191 PU 6191 GtC3 6t91 8NIE 6191, IN 6191 PU 6i91 OHMN 6191 OHMS 6191 OHMN 6i91 F/HR 6~1 GA~! 6191 HEN~ [,W~ CPS 6191 HFF~ ~ . CPS 619i TAB bW~ HR 6191 TABD b~] i~R 6 - CHAN ** ICE APi API AP1 API R # LOG TYPE CLASS NOD t, 3 O0 000 00 0 13 00 000 O0 0 13 00 000 00 0 13 00 000 00 0 13 00 000 00 0 13 00 000 00 0 13 00 000 00 0 13 00 000 00 0 13 O0 000 O0 13 O0 000 00 0 !3 O0 000 O0 0 13 O0 000 00 0 13 00 000 00 0 13 00 000 00 0 13 O0 000 00 0 10113 O0 000 O0 0 FILE NUMB NUMB SIZE REPR PROCESS NUmB SAMP EhEM CODE (HEX) · 2 1 1 4 68 0000000000 2 1 1 4 68 0000000000 2 1 1 4 68 0000000000 2 I 1 4 68 0000000000 2 1 1 4 68 0000000000 2 1 I 4 68 0000000000 2 I 1 4 68 0000000000 2 1 1 4 68 0000000000 2 I 1 4 68 0000000000 2 I 1 4 68 0000000000 2 1 I 4 68 0000000000 2 I 1 4 68 0000000000 2 1 1 4 68 0000000000 2 1 1 4 68 0000000000 2 1 1 4 68 0000000000 2 I I 4 68 0000000000 ** DATA DEPT 10911. PEW:L~I -999. PS~.LW1 -q99. HFNA.Lwl 10911, 000 RHOB.LW1 250 DCAh.bW1 250 DER.LW1 500 HEFA.LWI DFPT. lO000.00O RilOB.bWl PEF.I, Wl 4.2!6 DCAL.LWi P$~.L,1 5,242 OER.bW! HFN~.LWJ %0000.500 HEFA.LW! DFpT. 90(50.000 PHQB,LWl PE~.L~I 3.B65 DCAL.LWI P$~.LW1 2.9~3 DER.LWl HFN~.L~1 9000.500 HEFA.LW1 -999.250 DPMI.bWI -999'250 TNPH.hWI -999 250 ROPE,LW! -999:250 TAB.IjW! 2.351 DPHI.6Wl 0.011 TNPH.DW1 5.016 ROPE.bWl 5.575 TAB.bWl 2.269 DPHI,LWl 0.091 TNPH,LWl 2.970 ROPE.hWl 6.513 TAB,bW! '~ .250 ATR:~WX 18 100 - 41.300 ATR. 206.~27 GR.LWl O. 06 TABD.LWl 23 10§ DRHO.LWl 34i90 ATR.LWI 23~) 761 GR.LWl .40 TABD.LW1 '999,250 '999,250 '999,250 '999,250 .o'oo 4,341 118,958 1,144 0'012 9~: 947 979 0,800 24-AUG-1994 16:06 PAGES 9 [$ Tape Verification Listinq ~hlumberger AlasKa Computinq Center DFPT 8000.000 RHOB.LWl 2.366 DPHI.SW1 17.200 DRHO.LW1 DEF ~ L,~q ~ 3.569 DCAL.LW! 0 088 TNP},~' LWI 37'300 ATR.LW1 PS~.LW~ 2.565 DER.LWI 21428 ROPE.LWi 2~6.847 GR.t,W~ H~N~ t,,~i ~000 500 ..EFA LWi 6 080 T~B.~I 0 367 TABD.L~I 7000 500 ~,~:,F~ LWl 6,351 TAS,I.,Wl 0.309 TABD LW1 DEPT. 6000.000 RHOB.LWi 2.271, DPMI'~W! 23 000 DRHO,LWI, PE~,L~I 3.048 DC~L.b~i 0.109 TNPH,bWl 35 000 ATR.LW1 P$~.LwI 4.21~ DER.LWI 4.402 ROPE~LWl 373 313 GR.LWI HEN~.LW~ 6000.500 HEFA.LWI 6.136 TAB.LW1 0 444 TABD DEFT 5000.000 aitOB.bWl 2 235 DPHI,.LW! 2~.100 PEF:I,~I 2.594 DCA~..bW1 0:i40 TNPH.*GWl 3~.000 PSP'I, Wl 3.439 OEa.b~l 3,48!, ROPE~W1 533.154 HENA..LWI 5000.500 HEFA.LW1 5.455 TAB.SWi 0-,219 DEPT 4037.000 RHOB.bWl -999.250 DPHI.LWl -999.,250 PEF:LW~ ;999.250 DCAL.LWl -999.250 TNPH'~wl -999~50 P$~.LW1 -999.250 DER.bWl -999.250 ROPE,SW1 -999.250 H~NA.LW1 4038.000 HEFA.LW~ -999.~50 TAB'LW! -999'250 ** END OF DATA DRH~ LWl GR [,~l TABD.LW1 DRHRO LW 1 AT ;LW1 ~ABD,,L~I 5 275 881 006 364 0,523 *004 ;976 "I::I 0~009 3,567 100,296 0,458 ' 99~eS0 -999'250 -999~250 **** FILE FILE NA~E : EDIT .002 S~RVlCE : VERSIflN : OO~.COI DAT~ : 94/08/~2 MAX REC SIZE : FILF TYPE : LO L~ST FII,E **** FILE NEADER **** FIL~ NA~E : EDIT .003 S~RVICE : FLIC VERSION : O01CO1 DAT~ : 94/08/22 ~X REC STZE : 10~4 FILF TYPE : LO L~ST FILE : FTLW HEADFR FILF NUUBFR 3 IS Tape 'V~rlficati. on !.;lstinq :hlumberQer Alaska Computtno Center 24-AUG-1994 16:06 RAW MAD Curves and log header ~ata for each bit run in separate BIT R1.J~ NUMBER: 2 DEPTH INCREMENT: 0.5000 # FILE SU~NARY LD~G TOOL CODE CON CD~ $ LOG HEADER DATA START DEPTH 10913.0 STOP DEPTH ll;;;.'o .... 11545.0 DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (~E~ORY or REAL-TIME}: TD DRILLER (FT): TOP LOG INTERVlb ROTTO~ L~G I~TERVAL (FI): BIT ROTATING SPEED HOLE I~CLINaTION [PEG) ~INI~U~ A~GLE: ~XIaI]~ ANGLE: TOOL STRING [TOP TO VENDOR TOOL CODE TOOL TYPE [;........... ..... R RESISTI CD~ NEUTRON/POROSITY S ~OREHOLE AND CASIN~ DATA OPE~3 ~OI.E BIT SIZE (IN): DRILl, ERS CASING DEPTH BOREHOLE CONDITIONS MUD TYPE: ai~D DENSITY (LB/G): ~UD VISCOSITY MIlD P~: MUD C~LORIDES FLUID LOSS ~AXIMU~ RFCORDEP TEMPERATURE (DEGF){ R~SYSTiVITY COiiNN) AT TEMPERATURE (DEGF): ~UD AT MEASORED TEMPERATURE (MT): uOD AT ~AX CIRCULATING TEMPERATURE uOD FII,TRAT~ AT (MT): l~O0 CAKE AT NEUTRON HATRI×: ~ATRI× DENSITY: HOb~ CORRFCTi[I~ 93'0CT-9] FAST 2.4 V4,0C MEMORY ~tS~5.0 4057.0 11544.0 TOoL NUMBER RGSOSS ND$057 8 5O 10,50 150.0 2.070 2.640 SANDSTONE 2.65 files. 77.0 58.0 Tape Verl~i. catlom bistfno 24-AUG-1994 16:06 :blu~berger AlasKa Computinq Center # REMARKS: **~,~, RUN DRILLED INTERVAL: RUN I 4185-!0913 FT D~ILLED INTERVAL: R~N 2 10913-1~545 FT HOLE A~,IGLE AT TD:45.5 PEG ~ i~545 FT aAXIHU~ HOLE ANGLE : 67,9~. DEG TD WELL ~ 07:45 OCT 23, 1993 LIS F~RMAT DATA DATA FORMAT SPECIFIC~ TION RECORD ** SET TYPC - 64EB TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 64 4 66 5 66 6 73 7 65 il 66 16 17 66 1~ 66 0 14 65 FT 15 66 68 16 66 0 66 ** SET TYPE - CHAN ** NAME SERV U.IT S RVICE API API P API FILE NUMB NU B SIZE R PROCES TD ORDE~ # bOG TYPE CLASS NOD NUmB SAMP ELEM CODE (HEX) '''''''''''''F;D~PT ~ .... 6 T 9113 .... ' ..... oo '"'"'"'""'"""~'"'"'""'""'"""'"'"'""'000 oo 0 3 I 4 68 0000000000 RMOB LW~ G/C3 6Ig113 O0 000 O0 0 3 1 1 4 68 0000000000 DPH! D.~HO LW? PFF Lm ~ DCAL b~ ~. TNPM ATR LW~ PSR I,w2 P!3 610113 O0 000 O0 0 ] 1 1 4 68 G/C3 6t9113 O0 000 O0 0 3 I 1 4 68 BN/E 619113 O0 0~0 O0 0 3 1 ! 4 68 IN 6iq113 O0 000 O0 0 3 1 1 4 68 PU 61q113 O0 000 O0 0 3 i i 4 6~ O~a~ 6191~3 09 000 O0 0 3 1 1 4 68 O~SM 619113 O0 000 O0 0 3 1 I 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 tS Ta~e Yerific~tio~ ~,istln~ :hlum erger AlasKa Computin. Center 24-AUG-1994 16:06 PAGE~ 12 ~ ER V U N I T ROPE L~2 F/HR G~ LW2 H~N.a LW2 CPS HEF.a L~,~ CPS $ RVICE aP APl FISE 0MS NOM SIZE RE PROC ORDER # LOG TYPE CLASS MOD NUMB SAMP EbEM CODE (HEX) ....... ....... ,~1,3 O0 O0 0 3 I I 68 0000000 0 619113 O0 000 O0 0 3 1 I 4 68 0000000000 619113 0O 00O 00 0 3 1 I 4 68 0000000000 619113 O0 ' OO0 O0 0 3 1 i 4 68 0000000000 619113 00 000 00 0 3 1 1 4 68 0000000000 TAB ~,~2 ~iR 619113 O0 O00 O0 O 3 1 I 4 68 0000000000 TABD I,~2 ~ 61911.3 00 000 O0 0 3 I I 4 68 0000000000 ** DATA ** DEPT 11544.000 RHOB.bW2 -999:.250 DPHI.bW2 -999.~250 DRHO,LW~ ' .. . "99~,250 TNPH LW2 -999.~50 ATR~LW~ PEF,LW2 -999 250 DCAL~bW2 . P$~,L~ -999.250 DER,LW2 -999'~50 ROPE.,bW2 39.221 GR'LW~ HEN~,LW2 -99q,250 HEFA.bW2 11544.500 TAB.LW2 -999.250 TABD.LW2 DEPT 11000,000 RHOS.LM2 ,2,435 DPMI..bW2 ~3,000 DRHO,LW2 PEW:LW~ 4.213 DCAb. LW2 0.117 TNPH.bW2 38..600 ATR,L~ P$~,L~2 1.874 DER.LW2 9819 ROPE.bW2 40,759 GRiLW2 HEN'A.LW2 278,750 HEFA.LW2 ~100 [500 TAB.bW2 0.340 TABD.LW2 DEPT 10751,(300 RHOB,LW2 -999 250 DPMI.bW2 -999.250 DRHO.LW2 PEF~I.,W~ -999,250 DCAL,bW2 -999~250 TNPH.bW2 -999.250 ATR,L~2 P$~,L~2 -999.250 DER,LW2 -999.250 ROPE.LW2 -999.250 GR..LW~ HEN~.I.,W2 -999.250 HEFA.LW2 10751'500 TAB.bW2 -999.~50 TABD.LW~ ** ENl.) OW DATA -999 ~50 '999 50 -999~..250 -999~250 ~999,250 **** FILE TRAILER **** FILE NA~E : EDIT ,003 $~RVICE : FLIC VERSION : O01COI DATF : 94/08/~2 NAX REC $~ZE : FILE TYPE : L{) LAST FILE **** TAPE TNAILEP **** $~RVICE NA~E : EOIT DATM : 94/08/~2 ORIGIN : FbIC TAPF NA~E : 9.~497 CONTINUATION # : ~ P~EVIOUS TAPE : COMMENT : ~RCO ALASKA, INC.,KUPARUK RIVEP UNIf, PA-20,50-130-20196-00 ohlu~berger Alaska Comput~nq Center 24-aUG-1994 16:06 **** RMEb TRAILER SERVICE NAME : EDIY DATE : 94/08/P2 ORIGIN ~ ~bIC REEL ~AWE : q349V CONTI~UATION # : PREVIOUS ~£~ : COMMENT : ARCO AbASKA, I~C.,KUPARUK RIVER UNIT, 2A-20,50-103-20196-00 ALASKA COHPUTZNG CENTER COMPANY NAME : ARCO ALASKA, INC,~ W~Lb NAM£ : 2A-20 FIELD NAM~ ~ KUPARUK RIVER BOROUGH ~ NORTH SLOPE API NUMBER : 50-103-20196-~0 REFERENCE NO : 93497 RECEIVED JAN 1 B 1994 Na~l~ Oil & Gas Cons. Commi,~ion Anchorage IS TaPe Verification Listing :hlumherger AlasKa Computino Center 20-DEC-1993 1~:11 DAT~ t 9.3/12/20 ORIGIN : FLIC REEL NAME t 93497 CONTINUATION # ! COMMENT : ARCO ALASKA, INC.,KUPARUK RIVER UNIT, **** TAPE READER **** SMRVICE NAME t MDIT DATE : 93/12/~0 ORIGIN : FDIC TAP~ NAME ! 93497 CONTINUATION # : ~ PREVIOUS TAPE : COMMENT : ARCO ALASKA, INC.,KUPARUK RIVER UNIT, 2A-20,50-130-20i96-00 T~PE HE~DER KUP~RUK RIVER MWD/M~D LOGS # WELL MA~E~ API NUMBER: OPERATOR: L~GGING COMPAM¥~ .T PM CREATION DATE: ~OB DAT! JOB NU~BER~ LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION~ TOWNSMIP: RANGE~ FSL: FWLt ELEVATION{FT FROM NMb O) DERRICK FLOOR: GROUND LEVEL~ # W~bb CASING RECORD BIT RUN 1 ST, A~OUR NICOLS 2A-20 50~032019600 ARCO AhASKA, INC SCHLUMBERGER WEG£ SERVICES 20-DEC-g~ STRING STRING BIT RUN 2 93497 ST. AMOUR NICOLS 14 BIT RUN 3 696 53 135,00 135,00 94,0o OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) D~PTH (FT) 8.500 9.625 4167,0 ~S Ta~e Yerlllc~tlon Listing 20-DEC-1993 18~11 :hlumberger las~a Comput ng Center )RD STRING PRODUCTION $?R)NG R~S RP TO BIT: 68 go FT NDB RP TO BIT: 12~.99 FT RES TO BIT: 65.73 FT GR TO BIT:.76.15_ FT DEN TO BIT. 130.30 FT NEUT TO BIT~ 137~:~4 FT DRILLED INTERVAL~ 4185 10913 FT RGS ~P TO BIT~ 19.37 FT NDS RP TO BIT~ 41.86 FT RES TO BIT: 16.~0 FT GR TO BIT:,~6.6~ FT DEN' TO BIT) 4).~7 FT N~UT TO BIT: 50,'15 FT D~ILb~D INTERVAL:-X09~3 - ~1545 FT WASHDOWN INTERVAL: 10803 - 10913 FT ~XI~U~ HOLE aN~L~ ~ 67.9! PEG' 8~ 7 90 FT TD WEb5 ~ 07:45 OCT. 23, ~993 $ LiS FORMAT DATA S~RVIC~ : rb~C V~RSION : 001C0~ DAT~ MAX REC SIZ~ : ~024 FIL~ TYPE : LO L~ST FILE F~br ~EADER FIL~ NUMBER~ 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. D~P?M I~C~E~ENT: 0'5000 FTL~ SUMMARY tDWG TOOL CODE mm#mmmmmmmmmm~ START DEPTH ! 5~0o0 !ISIR.O CDN $ # BASFGINE CURV~ FOR SHIFTS: CURVE SHIFT DATA CMFASURED DEPTH) STOP DEPTH 4~10.0 4110,0 IS Tape Verification List~.ng chlumberqer AlasKa Computino Center 20-DEC-1993 18:1! 3102! 0 10985 0 30903 0 10840 0 10809 5 10789 0 ~0765 5 10690 5 10666 5 1060O 5 10558 0 ~0~8~,0 10325,0 100.0 $ MERGED DATA SOURCE LDWG TOOL CODE CDR CD~ CDR CDN $ --~-------EQUIVALENT UNSHIFTED 11180,5 ~1!10,5 11041.5 10898.0 1.0837.5 10809.0 I0787.0 ~0765,5 10688.0 10666.5 10632,0 10598 5 10558~0 10379.5 10325.0 100.0 BIT RUN NO,. MERGE TOP I 4110,0 1 4110,0 2 10913,0 ~ 10913,0 ~ERGE BASE ~mmmmmmmmm 1091].0 1091 .0 11545°0 1.1545.0 THE DEPTH ADJUSTMENTS SHOWN ABOVE REFLECT MWD GR TO WIRELINE CET/GR OF 04-NOV-1993, ALL OTHER CURVES WERE CARRIED WITH THE GR SHIFT. THE VERY ENHANCED ORO PROCESSFSSED RESISTIVITY DATA WITH A 2' AVERAGE I8 CONTAINED IN THIS FILE. $ LIS FORMAT DATA DATA FORMAT SPECIFICATION RECOWD ~$ ~* SET TYPE - 64E~ *~ TYPE REPR CODE VALUE I 66 0 2 66 0 3 ~3 60 IS Tape Verification Listing shlumberger Alaska Computing Center 20-DEC-1993 18:!I PAGE{ 4 TY R CODE ALUE 4 66 ~ 5 66 6 73 7 65 8 68 0 5 1~ 66 ~7 12 68 1~ 66 0 14 65 FT 15 66 68 ~6 66 0 66 0 ~* SET TYPE - CHAN ~ NAME SERV UNIT SERVICE API AP! AP! APX FILE. NUMB NUMB SIZE REPR PROCESS ID ORDER # 50G TYPE CLASS MOD NUmB SANP ESEN CODE (HEX) DEPT FT 619113 O0 000 O0 0 I I 1 4 68 0000000000 RHOB MWD G/C3 619113 O0 000 O0 0 1 1 1 4 68 0000000000 D~HO ~WO G/C3 619113 00 000 00 0 I 1 1 4 68 0000000000 P~F ~WD BN/E 619113 O0 000 O0 0 I 1 1 4 68 0000000000 C~LN ~WD I~ 619113 00 000 00 0 I 1 I 4 68 0000000000 NPH! MWD PU-S 619113 00 000 00 0 1 I 1 4 68 0000000000 Ri MWD OHM~ 619113 00 000 00 0 1 I i 4 68 0000000000 RP ~WD OHM~ 619113 00 000 O0 0 1 1 I 4 68 0000000000 D~R MWD OHMM 619113 O0 000 O0 0 1 1 I 4 68 0000000000 V~P ~WD F/HR 619113 00 000 00 0 1 ! 1 4 68 0000000000 V~A ~WD GAP! 619113 00 000 00 0 I 1 1 4 68 0000000000 ROP MWD FPH~ 619113 00 000 00 0 1 1 1 4 68 0000000000 HFF~ MWD CPS 619113 00 000 00 0 1 1 1 4 68 0000000000 NCNT MWD 610113 00 000 00 0 1 !, 1 4 68 0000000000 FCNm MWD GAPI 61911.3 O0 000 O0 0 1 1 1 4 68 0000000000 ~mmm~mmm#m mm~mmmmmmmmmmmmmmmmmmm#mmmmmmmwmmmmm#mm#mm~mwmmmm~mm~m~! D~PT 11539.500 RttOB.MWD -999.250 DRHO.MWD -999,250 PEF.MWD CALN'~WD -909,250 NP~I.MWD -999,250 RA.MWD -999 250 RP,.MWD DE~'MWD -999,250 VRP.MWD 39,~2! VRA,MWD -999!.~50 ROP.MWD H~F~MWD -999.250 NCNT'MWD -999.~50 FCNT.MWD -999 250 DFpT 10000 000 RHOB.MWD ~ 351 DRHO.MWD -0 001 PEF.MWD CAbN:MWD 8:511 NPHI.MWD 41i300 ~A.MWD 4!341 RP.MWD DE~.,WD 5.016 VRP.MWD 206 927 VRA.MWD 118 958 ROP.MWD H~F~.MW~ 5.5~5 NCNT',WD 0,806 FCNT.MWD 78.141 '999,250 '999,250 11544,500 4'216 5,242 10000.500 IS Tape Yerification Listing chlUmberger AlasKa Computing Center D~PT, 8000°000 CAhN,~WD 8,588 DEPo~WD 2,4~8 H~F~.~WD 6.080 RHOB..MWD NPHI~MWD VRP.MWD NCNT.~WD RHOB.~WD NPHI,MWD VRP,NWD NC,T~MWD RHOB'MWD NPNI,MWD VRP.MWD NCNT,MWD DFPT. 6000,000 CALN,~WD 8.609 DE~,~WD 4,402 HEFA.~WD 6,136 D~PT, 4037 000 ,CALN.MWD -999 250 DEP.MWD -999 250 HEFA,~WD -999 250 END OF DATA 20-DEC-1993 18:11 . 366 DRHO,MWD 3 .300 RA,MWD ~16,~47 VRA,MWD 0.367 FCNT,MWD 2 ~, DR.O.MWD 35 0 RA,.MWD 373 313 VRA:~MWD 0 444 FCNT-~WD -999,~50 DRMO,MWD -999,~50 ~A,MWD -999.~50 VRA~MWD -999,~50 FCNT~MWD 0.015 2.25O 125,275 -999.250 0.004 4.976 83.106 '999.~50 -99 50 -999 50 PEF.MWD RP.MWD ROP,MWD PEF,MWD RP,MWD ROP,~WD PEF.MWD RP,MWD ROP.~WD 3'~69 2, 65 8000':500 31.048 6000,500 ,250 403~;000 **** FILE TRAILE~ **** FILE ~A~E : EDIT .001 SERVICE ~ F6IC VERSION : O0tCOi DAT~ ~ ~3/12/20 ~AX AEC SIZE ~ J024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NA~E : EDIT .002 S~RViCE : rbIC VERSION ~ O0~COI DAT~ ~ q3/1~/20 MAX AEC SIZE ~ ~024 FILE TYPE C LO LAST FILE : FILE HEADER FILR NUMBER 2 R~W MAD Curves and loQ header data for each bit run in separate BTT RUN NUMBE~: 1 DFPTH INCREMENT: # FILF SUMMARY LDWG TOOL CODE CDN CD~ 0.5000 START DEPTH ';;;;:;'''' 4110.0 $IOP DEPTH 10913.0 !0913,0 files. IS TaPe Veriffcation Listing ~hlumbergerAlaska Computing Center 20-DEC-1993 1~:11 # LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or R~AL-TIME)~ TD DRILLER TOP LOG INTERVAL (FT)I BOTTOM LOG INTERVAL WIT ROTATING SPE~D CRPM): MOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLEI TO05 STRING (TOP TO BOTTOM) VENDOR ToOL CODE TOOL TYPE CDR RESISTIVITY CON NEUTRON/POROSITY $ ~OREHOLE AND CASING DATA OPEN ~OLE BIT SIZE (IN)~ DRILLERS CASIN~ DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE~ MUD DENSITY (LB/G) MUD VISCOSITY ($) NUD PHI MUD CHLORIDES CPPM): FLUID LOSS (C3)~ MAXIMUM RECORDED TEMPERATURE (DEGF), RESISTIVITY (OHMM) AT TEMPERATURE CDEGF): MUD AT MEASURED TEMPeRaTURE MUD AT MAX CIRCULATING TEMPERATURE ~UD FILTRATE AT (MT)~ MUD CAKE AT ~EUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION TOOL STANDOFF (IN): EWR FREQUENCY (HZ)~ R~M~RK$~ 23-0CT-93 FAST 2,4 V4,0C MEMORY 11545.0 4057 .0 67.9 TOOL NUMBER RGS055 ~D8057 8,500 4167.0 10,50 150o0 2,070 2,640 SANDSTONE 2.65 ****** RUN 1 AND 2 ************ DRILLED INTERVAL: RUN 1 4185-t0913 FT DRILLED INTERVAL{ RUN 2 {0913-11545 FT HOLE ANGLE AT TD=45,5 DEG @ 11545 FT MAXIMUM HOLE~AN~LE = 67.91DEG ~ 7890.00 FT TD WELL ~ 0?:45 OCT 23. ~993 $ 77.0 58.0 Tape Verl, ficat~on Listing chlumberger AlasKa ComputinO Center # bis FORMAT DATA 20-DEC.,,1993 l~:li PAGE{ 7 DATA FORMAT SPECIFICATION RECORD SET TYPE TYPE REPR CODE ~VALUE 1 66 0 2 66 0 3 73 64 4 66 ! 5 66 6 73 7 65 11 66 16 1~ 68 1~ 66 0 14 65 FT 15 66 68 16 66 ! 0 66 NAME $gRV UNIT SERVICE API APl[ A ID ORDER # LOG TYPE C5 DEPT FT 61911] O0 000 O0 RMOB LW1 G/C3 619113 O0 000 O0 DPH! LW1 Pi{ 619113 O0 000 O0 D~HO LW! G/C3 619113 O0 000 O0 PEF LW1 B~/E 619113 O0 000 O0 DCAL bWl IN 619113 O0 000 O0 TNP~ LW1 PU 619113 O0 000 O0 ATR LW! OHM~ 619113 O0 000 O0 PSR LW1 OHM~ 610113 O0 000 O0 DER bW! OHM~ 619113 O0 000 O0 ROPE LW1 F/HR 619113 O0 000 O0 G~ LW! GAPI 619113 O0 000 O0 HENA LWI CPS 619113 O0 000 O0 H~F~ LWi CPS 619113 O0 000 O0 T~B LW1 H~ 61q113 O0 000 O0 TABD LW1 HR 619113 O0 000 O0 PI APl FILE NUMB NUMB SIZE REPR PROCESS ASS MOD NUMB SAMP ELEM CODE (HEX) 0 2 1 1 4 68 0000000000 0 2 1 ! 4 68 0000000000 0 ~ 1 I 4 68 0000000000 0 2 1 1 4 68 0000000000 0 2 1 I 4 68 0000000000 0 2 I 1 4 68 0000000000 0 2 1 1 4 68 0000000000 0 2 1 1 4 68 0000000000 0 2 1 1 4 68 0000000000 0 2 1 1 4 68 0000000000 0 2 1 1 4 68 0000000000 0 2 1 1 4 68 0000000000 0 2 1 1 4 68 0000000000 0 2 1 ! 4 b8 0000000000 0 2 I I 4 68 0000000000 0 2 I 1 4 68 0000000000 IS Tape Verification Listing chlumbergerAlasKa Computing Center 20-DEC-1993 IS11! PAGE: · * DATA ** DEPT I0911,000 ~HOB,LWi PEF~LW1 -999 250 DCAb.' bWl PSR.LW1 -999' HENa LW1 109~1® . .500 DEPT 10000'000 PEF~LW~ 4.216 OCAb,bWi PS~ LWI 5,242 DER.bW1 HENI~LW1 10000.500 HEFA.bWl DEPT. 8000.000 RHOB.LWi PEg.bWl 3.569 DCAb.bW1 PSR,LW1 2,565 HFNA,LW1 8000.500 HEFA'bW1 DEPT 6000,000 RHOB.bW1 PEF!LW' 3:~48 DCAb,bWi PSR LW' 4 lO DER.'LW1 H~NA.LWI 6000.500 HEFA'LWl D~PT, 40~ 0 PS~;LW1 -999 50 DER'!BW1 H~NA'LW~ 4038'000 HEFA.LWl ~999.250 DPHI.hWl 999,250 TNPH,bWl :999,250 ROPE,~W1 999.250 TAB.LWl  51 DPHI,bWl 5.016 ROPE, bW1 5.575 TAB,LW1 2.366 DPHI.LW1 0.088 TNPH.LWl ~.428 6.080 TAB,bWl ,27! DPHI,bWl ~'t09 TNPH.,:LW1 4.402 ROPE.'~WI 6,i36 TAB,'bWl '99 ,250 -99~ DPHI,bW ..250 TNpH,~W -999.250 ROPE,~.WI -999,250 TAB.bW! -999.250 DR~..LW! '999,250 A ,bWl .149'.259 GR.LW! -999.250 TABD'LW1 18'~100 DRHO.LWl 41.300 ATR.LW! 206.927 _ GR,hW1 0.806 TABD,LWl 17,.200 DRHO.Lwl 37'.~ 0 ATR,LW1 216. ~? GR,LW1 0.:36T TABD.bW1 2~.000 DRHO,5w1 35'000 ATR~LWI 373'3!3 GR,LWt 0'444 TABD,bW1 :9 9 DRHO.LW! 9~9-250 .250 -999.250 GR,.LW1 -999.250 TABD.LW! -999~;250 -999,250 "0,001 4,341 118,958 1,144 0~015 2.~250 125,2'75 0,881 o'o 4 4,9~6 83,~I06 i't64 -999'250 ** END OF DATA ** **** FILE TRAILER **** FILM NA~E : EDIT ,002 SERVICE ~ FbIC VERSION : 00lC01 DATE ~ 93112/20 MAX REC STZE : 1024 FIb~ TYPE : LO b~ST FILE : **** FILE HEADER F~bF NA~E i EDIT ,003 SERVICE ~ rbIC V~R$ION ~ 001CO1 DATF : 93/12/20 MAX REC SIZE : 1.024 FILE TY~E : LO FIb~ HEADER Tame Verlflcatlon Listing :hlumberger. lasKaA Computing Center FILE NUMBER 3 RAW MAD Curves and log header data tot each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCWEMENT: 0.5000 # FILE SUMMARY LDWG TOO[, CODE START ;iii'i'"''' o CDR 1 ~ 0 ~OG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TI,E): TD D~ILLER ~FT!~ # TODL STRING (TOP TO BOTTOM) VENDDR TOOL CODE TOOL TYPE m~m.mm~mm~mmmm .mmmmN~mm CDR RESISTIVITY CDN NEUTRON/POROSITY BORENOLE AND CASING DATA OPEN HOLE BIT S~ZE (IN'): DRILLERS CASING DEPTH ~OREMOLE CONDITIONS MUD TYPE: MUD DENSITY MUD VISCOSITY MUD PM: MUD CHLORIDES FLUID LOSS MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF); MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE ~UD FILTRATE AT MUD CAKE AT (MT)I NEUTRON TOOL MATRIX: MATRIX DENSITY: STOP DEPTH 1i545,0 11545,0 23-0CT-93 FAST 2,4 V4.0C .MEMORY 1154),.0 .4057.0 x1544.0 67.9 TOOL NUMBBR · ND80 8 500 4{67.0 10,50 150.0 2.070 2,640 77.0 58.0 SANDSTONE 2.65 IS Ta e Ver~fication Listtn~q Center chtum~erger AlasKa ¢omputin.~ 20-DEC-1993 18~11 HOLE CORRECTION (~N): TOOL STANDOFF (IN)~ ~WR FREQUENCY (HZ)~ # REMARKS: DRILLED INTERVAL: RUN I 4185-10913 FT DRILLED INTERVAL: RUN 2 10913-11545 FT HOL~ ANGLE AT TDm45:5 DEG"5@ 11 45 FT MAXIMUM HOLE.ANGLE - 67,91DEG 9 7890,00 FT TD WELL @ 07.45 OCT 23, 1993 $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION ~ECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 ~ 73 64 4 66 1 5 66 6 73 7 65 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 ~: 0 66 1 mmmmmmmmmmmmmmm~mmmmmmmmmmmm~m ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ~D ORDER # LOG TYPE CLASS MOD NUMB SANP gLEN CODE (HEX) DEPT FT 610113 O0 000 O0 0 3 1 1 4 68 RHOB bW2 G/C3 619113 O0 000 O0 0 3 1 1 4 68 DPHT LW2 PU 610113 O0 000 O0 0 3 1 1 4 68 DRHO LW~ G/C3 619113 O0 000 O0 0 3 1 1 4 68 PFF LW2 BN/E 610113 O0 000 O0 0 3 1 1 4 68 DCAL LW~ IN 619113 O0 000 O0 0 3 1 1 4 68 TNPH LW? pl.) 619113 O0 000 O0 0 3 1 I 4 68 ATE bW2 OHM~ 619113 O0 000 O0 0 3 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 Tape Ver~,ficatlon Listing :hlUmberger Alaska Computing Center 20-DE¢-1993 18:11 ii NAME SERV UNIT SERVICE API API APl AP1 FILE NUmB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SA~P EDE~ CODE (HEX) PSR bW2 OHMM 619113 O0 000 O0 0 3 1 I 4 68 DER LW~ OHMM 619113 O0 000 O0 0 3 1 1 4 68 ROPE LW2 F/HR 619113 O0 000 00 0 3 i 1 4 68 G~ DW2 GAPI 619113 00 000 00 0 3 1 I 4 68 HEN~ ~W~ CPS 619113 00 000 O0 0 ) 1 1 4 68 HEF~ LW~ CPS 6191~3 00 000 00 0 ~ I 1 4 68 TAB 5W~ HR 619113 00 000 O0 0 3 1 1 4 68 TABD LW2 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 HR 6191~3 O0 000 O0 0 3 I 1 4 68 0000000000 D~PT. 11544"000 RHOB,hW2 -999 250 PEF'LW2 999,250 DCAL.LW2 -999 250 PSR.LW2 999,250 DER'hW2 -999 250 HENA.LW~ ~999,250 HEFA-LW2 11544 500 D~PT 1075~.000 RHOB.LW2 -999.~50 PEF:LW~ -99=,250 DCAL'DW2 -999.~50 PSRoLW2 -999.250 DER,~W2 -999.250 HENA.LW~ -999.2~0 HEFA~LW2 1075~.500 TNPH~bW2 ROPE,bW2 TNPH.bW2 ROPEi~'bW2 TAB.bW2 -999. ~0 ATR'LW2 . 3gi,~ 1 GR'~W2 999'250 TABD.LW2 :999'250 DRHO'LW2 -999.250 -999.250 -999*250 -999'250 -999,250 '999'250 -999 -999 0 END OF DATA *'1' FIDE TRAILER FIDE NAME ~ ~DI~ .003 SERVICE : FLIC VERSION : 001C01 MAX REC SIZE : FILE TYPE : LO L~ST FILE **** TAPE TRAILER $~RVICE NAME : DATE : 93/1~/20 ORIGIN ~ FLIC TAP~ NA~E : 93497 CONTINUATIO~ # : PREVIOUS TAPE COMMENT : ARCO ALASKA. INC..KUPARUK RIVER UNIT, IS Tape verlficatlon Listino ~hlumberqer AlasKa Computing Center 20-DEC-1993 18{11 **** REEL TRAILER **** SERVICE NAME : EDIT ORIGIN ~ FLIC REEL NAME { 93497 CONTINUATIOM # ~ COM EMT ~ ~RCO ALASKA INC',KUPARUK RIVER UNIT, 2A 20,§0-I03 20196'00