Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout196-001XHVZE
Pages NOT Scanned in this Well History File
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
File Number of Well History File
PAGES TO DELETE
RESCAN
[] Color items - Pages:
Grayscale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original- Pages'
Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
Logs of various kinds
[] Other
Complete
COMMENTS:
Scanned by: ~Dianna
TO RE-SCAN
Notes:
Vincent Nathan Lowell
Re-Scanned by: Begedy Dianna Vincent Nathan Lowell Date: Is~
A
h¢-8_red
TO: Blair Wondzell
FROM: Chris West
DATE: October 27, 1995
SUBJECT:
MPB-24 Well Suspension
APl # 50-029-22642
Blair;
Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20- -
AAC 25.110. As discussed this morning we propose setting three plugs in this well as detailed in the
attached form. This will allow us to retain the wellbore for potential future sidetrack or service well
use.
We would like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid Wastes. There
are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection
as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the
rig.
Thank you for your help in this matter. Please call me if I may be of any assistance.
Chris West
Drilling Operations Engineer
Nabors 27E
(907)-564-5089
ANNULAR INJECTION
DATA ENTRY SCREEN
$C~NNE~ NOV ~. ~ 2f]f~2
Asset MjID.e. ..........................................
Rig Name ~.~I~.Qr.~..2;~F~ .............................
Inj Well Name ~...P..(~.:2,5. .....................................
Sur Csg Dep ~.5.~..5. ................
Cumulative Data
Legal Desc .I..I..4.3.'.F.~.I,,.~,.~.~f}~.~.~.I,,..:~.e.~..1.0,.T.~I.:~,..E[I.QF,, .................................. Research
Permit End ......... .1/.[}l.~.7. ..........
Permit Start
Rig COmpletion Formation Intermittant Final
Well Total Mud/Ctg Wash Fluids FlUids ,Freeze Freeze
Daily Data
Source Datg~f Conlan~nated R ~ Forrnalion ~ ~ Freeze DaVy
.!, :Well. Injecli~ Dflg Mud Fluids Fluids ~ Tc~
M P0-25 02/01/96 225 t00 70 595
MPC-23 02/06/96 1,240 70 1,310
........................... ~ ................................... ~ ................................... ~ .................. i ........................ , .............................................................
· ................................................ , ................................................ , ................................................. , ............................................
..................................................... ~ .......................................... ~ ........................................ ~ ............................................. ~ ................................................. ~ .....................................................................................................................................................................................
...................................................................................................................................................................................................................................................................... , ................................................ , ................................................ , ................................................. , ................................................
}','.".'L'". .......... .............. : ............................................................................................................................................................................................. 1 ................... .......................... 1 .................. ................... '"'".'"'"'"" ............... .'"'"'"" ............ ". ....
........................................................................................................................................................................................................................
.......................................... 4 .......................................... ~ ............................................ , ..............................................................................................................................................................................................................................................
................................................................................................................................. ~ .......................................... ~ .......................................... ~ ....................................... , .......................................... , ............................................ , ..................................
.................................................. i
.................................................................................................. 1 .................................................. 1 .................................................. 1 .................................................. 1 ................................................. 1 ..................................................
i ( i.'i.i .i i..i.'... .i'.(.. . . ...i. ..i'i....('.......i.i....... .........i .. ..: i. .... '. . .....:... . ...:....:..... .....'.:.... ............... ..: : ..' :........'...'...:...... ........:...........:......:.... .....: :
Open
leared
rvices
rilling
December 14, 1998
900 East Benson Boulevard, MB 8-1 · Anchorage, Alaska 99508
(907) 561-5111 Fax: (907) 564-5193
Wendy Mahan
Natural Resource Manager
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, AK 99501-3192
RECEIVED
Re: Annular Disposal Information Request
Dear Ms. Mahan:
DEC 14 1998
Alaska 0il & Gas Cons. Comm'~sion
Anchorage
On October 28, 1998 you requested an update from Shared Service Drilling regarding Annular'
Disposal Records from July 25, 1995 through preSent time. We compared your list with our
records and are able to provide you with the following data:
· Individual Annular Disposal Logs from the SSD database which coincide with the approved
wells on your attached AOGCC Annular Log. The.SSD records are proVided to you in the ·
same order as listed on your log.
· There were some wells on your list which were not injected into. These wells are identified
as follows:
· Endicott wells 1-03/P-16, 1-65/N-25, 1-59/0-24
· Exploration well Pete's Wicked #1
· Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30, L-21, K-38, NMP #1 &
K-05, K-02, H-07, K-25, K-37, E-17, F-21, K-30, K-34, K-21i, F-66, K-06, K-54, K-33,
F-49i, K-18
· PBU Wells E-38, 18-34, 15-42, S-29A, 15-46, B-36, 15-43, 11-38
· The reason many of these annuli were not used is because the waste materials generated from
these wells were injected into other approved annuli. Hopefully the injection logs submitted
with this letter will clarify this. In addition, please note that our records show: '
· The wells listed above in italics were permitted but not used for annular disposal.
· The wells listed above in BOLD were not permitted for annular disposal. Wells drilled
after June 6, 1996 were required by SSD procedure to be permitted with a Sundry
Approval (10403) form. Our records show that no Sundry Approval for Annular
Disposal was filed for these wells. Wells drilled between July 25, 1995 and June 6, 1996
were automatically approved for annular disposal with the Permit to Drill.
· We also provide you with a cumulative report from our database of records from July 25,
1995 through the present. From those records, we show the following wells not listed on
your report were used for annular disposal:
8CANNED NOV I 3 2002:
...Annular Disposal Letter
.', 12/14/98
q4 · I?.~ ~4-14z- ~4 -~5'z-
Endicott wells 1-23/O-15, 1-61/Q-20, 2-40/S-22
Exploration well Sourdoueh g3 -
Mi~ePointwellsF-06, H-05, H-06, J-13, L-24 - ~-~
PBU wells 18-30, 18-31, 14-~,~43, E-34, E-36, G-~A, ~d S-33-~''°~
hdividu~ logs ~e provided to ~ou for t~ese ~ogs
· Finally, our records show that the B-24 outer annulus was left open (see attached
correspondence)
Thank you for the opportunity to provide claritY to these records. If I can be:of any further
assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental
Advisor at 564-4305.
Sincerely,
.
Fritz P. Gunkel
Shared Service Drilling Manager
FPG/KMT
cc: Dave Wallace - HSE Manager (w/out attachments)
SCANNED NOV 1 $ 2002
RECEIVED
!4 1998
pqaska Oil 8, 6as Cons, Commissio~
I-~1i.,.,, lO, ~
~ eBed
uedO, Z6/SL/~ 96/8L/~ OOL G89
gS~ 88g'8 I. 809'6 I. q I. I. I::IN~ I.J.'go'oes '-19M,O0 I. ~'-ISN,8t~98 80gC Z I.-Nd~l
pesolo Z6/9Z/& 96/9Z/L 99~'L 089'1~ 98Z'9 ~I~ZH 'N6J. '6Z 'oes 'q~J ,Z909 'qS~,gl~Z~ 98Z~ 8# q6nopJnos ~ I¢
snlelS PU3 Pels ezee~=l eZee~:l' sp!nl_-I sp!nl_-I qseNt s610 ~g lelO/wno 3se0 le6e'l
snlnuuv poped lesods!o leuL-I [uno uJ~elUl uJno uJJo-I [uno IdLuoo tuno §!1:1 ~uno pn~/wn0
GL uo~,
gt uo~,
N3dO 86/Z/cJ /_6//./9 09 t t G' ~
uedo /_6/LS/L 96/LI~/L O~t f;l~0~ t 9/_Z' L L tg'8 L9Z'f; 'NL ~1 'eZ 'O3S 'q3M ,990L '3SN ,SZ9g ,9G~g 0g-a 6 uo&o~
.................................................................................................................uedo 96/SL~L ~'~"~'~"[' ............. ~'~[ ............................................................................................................... : .................. '['1';;~ ................ ~'~;"[ .............................. '~'~'~;'[' .................................. ~'"'~ .................................... ~'~"[-~'";'~"["[1';'~"~"';5'~'A':'~['~'";~'~'~;'~;'~'~ .................................. ['~ .......................................... ~'~'[; .................... aa
uedo Z6/LZ/Z 96/LZ~ 09L G9~ 099 ~9L e9~'~ B~L~ 'NL L&'Z oas '33~,~ZL~ ']SN,Z~ 0ZG~ ~-~ ~e
~OI
uedo 96/[~L G6/Z~/~ L 0Z S~ 99[ 0~'L 006'~ 06L'9 ~0t~ 'N~L~'8 oeS '~3M,08[G '3SN,~99C GLG9 ~-~d~ 3Z~ sJoqel
uedo g6/tB/~ L 96/L~/9 GZ 999'6 01~Z'6 ~0LId 'NBL/'9 oes "I~M,~0G~ 'gSN,gZLZ ZZLG 69-4din ~Z~ sJoq~l
uedo ~6/L£/~ L G6/£ L/0 L OZ 9L~ 98~ ~0LId 'N~L/'9 ~eS '-1~,/~9~ "ISN,LI~[~ 6~09 ~9-~dV~ ~Z~ sJoql~l
ot,~
96~
ezeeJ-I ezeeJ=l sp!nl-I sp!nld
leU!:l wno wJelul wnD [uJo-I wno Idmoo wnD
"SSZ t~6,"8~ cJZ/.'6L 30~TM 'NI~LI'9 oes '-13N~6cj~ "ISN,6g[;~ 6L6Z. 0Z--IdlN 3~ sJoqeF
0~_~;'~ ' Z0~'/.~ 'Z~'9'~ .... inn 30L~l 'Ne~J.';90:3eS 0699
.... ~z'~ '~.~6, ~ " ao~u 'N~;~'90 ~)a$ 99/_9 90-:~d~
qseM s610 '~ lelO/uJno osea le§a'l qldeo IleM
~1:1 reno pnl/~l uJnc)
eoepns
IJodel:l e^!leln[uno
966L JequJeoeo I!lun 666L 'Gg ~lnP
setunloA uoqoelul Jelnuuv
6U!ll!~a ~o!~S I~eqS
Shared Sei~vice Dr. illing
Ann/~i~'r injection Volumes
July 25, 1995, until December 1998
Cumulative Repor~
Surface
Casing
Rig Inj Well Depth
Nabors 28E B-33 3504'
Nabors 28E E-34
Nabors 28E E-36
Nabors 28E E-37
3664
3648
3810
Nabors 28E E-39 3638
Nabors 28E G-04A 3509
Nabors 28E G-21 3509
Legal Desc
969'SNL, 1898'EWL, Sec 31, T11N, Rt4E
168'SNL, 500'WEL, Sec 6, T11N, R:I4E
1706'SNL, 822'WEL, Sec 6,T11N, R14E
3391'NSL 881'WEL, Sec 6,T11N, R14E
Cum Mud
Cum Total & Ctgs
.
3.974 2,842
9,656 7,228
9,271 4,417
4,695 4,241
Cum Rig Cum Compl Cum Form Cum Interm Cum Final
Wash Fluids Fluids Freeze Freeze
857 195 80
1,420 858 40 110
1,293 3,096 365 100
374 80
3358'NSL 501'WEL, Sec 6,T11N, R 14E 2,250 928 220 1,022
2917'NSL 1974'WEL, Sec 12,T11N, R13E 5,937 1,798 1,824 2,315
2911'NSL 2368'WEL. Sec 12,T11N, R14E 11,430 3,956 3.072 4.270
80 8/28/95
10/20/95
70 62
Disposal Period Annulus
Start End Status
5/1/96 12/31/96 Broached
8/23/95 12/31/95 Open
7/25/95 12/31/95 Open
9/16/95 12/31/95 O 3en
12/31/95 O3en
12/31/95 O3en
9/8/95 12/31/95 O 3en
Nabors 28E S-24 2750 1633'SNL 4228'WEL, Sec 35,T12N, R12E 20,261 11,773 2,177 5,751 275 285 12/9/95 12/9/96 O3en
Nabors 28E S-33 2958 1639'SNL 1487'WEL, Sec 35,T12N, R12E 18,014 6,613 2,431 8,392 270 308 12/1/95 12/1/96 O3en
Nab.°..r.s 28E~ .......... ~.;'~.~! ......................... 3.3.~.! ................... 41.~.~'..N..S.~ .L,....4.5..0.~'....W....E.L,....~ e~...3..5..~? .2. N! .............................................. . .8.~.(~ .67 ........................... .4~..!..5..~9 ...................... ~.,.0,~..4 ............................. !?~4.. .~.!~ ...... 2/8/.96 .................... 2/8!..9~ ......................... ..0.?..e? ................
Nabors 28E S.42 3077 Sec 35, T12N, R12E 168 100 68 3/13/96 3/13/97 O 3en
Nabors 2ES H-35 3157 4535'NSL, 1266'WEL, Sec 21 ,T11 N, R 13E 4,860 3,725 555 480 20 80 10/26/95 12/31/95 O 3en
~labors 2ES H-36 3550 4478'NSL, 1265'WEL, Sec 21 T11N, R13E 1,452 857 100 410 85 10/26/95 12/31/95 O3en
Page 3
A
h¢sred
.cos..
ri-Iling
TO: Blair Wondzell
FROM: Chris West
DATE: October 27, 1995
SUBJECT:
MPB-24 Well Suspension
APl # 50-029-22642
Blair;
Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20-
AAC 25.110. As discussed this morning we propose Setting three plugs in this well as detailed in the
attached form. This will allow us to retain the wellbore for potential future sidetrack or serVice well
use.
We would like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid 'wastes. There
are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection
as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the
rig.
Thank you for your help in this matter. Please call me if I maY be of any assistance.
Chris West
Drilling Operations Engineer
Nabors 27E
(907)-564-5089
- .:
SCANNED "NOV I i:1"'2002
ANNULAR INJECTION
DATA ENTRY SCREEN
Asset Elilr).e. ..........................................
Rig Name ~.~II~.~.r.~..22,F,,,...i .........................
Inj Well Name M..P..~.-.[5. .....................................
Sur Csg Dep 1~.5.~..5. ................
$C;RNN~E) NOV 1 $ 2002
Legal Desc 1.1..~.'.F.~.I,,.2.4.~LE..Wk,..~.e.(;..1.Q,.T..1.2bL.EL1.QE ............................... ... Research
Permit Start .......... ~.L~/.~.6. ......... Permit End ......... .1/.§/'.~.7....~ ......
Cumulative Data
Rig Completion Formation Intermittant Final
Well Total MUd/Ctg WaSh 'FlUids Fluids Freeze Freeze
:.
..., ..... .1~..0.~..., ............... t,.~.~. ........ ~ ....... :,,..3.0.Q:~,,...:i .., ......... ~.,;: ............. ,,i,~,':....~,;, ........... ..~,,.:i;..,~,~:,,.,,:....~ : ........... 1.4.~ ..... ~,~.~ .:
Daily Data
Mud, Ctgs, Crrt' I~ Fi-Iai
~ Da~ of ' ConlarrinatedRig Wash C~ F~ Freeze Freeze DaJy
. Wel InjedJon Dflg Mud RJ:B Fluids Fluids ~ ~ Tolal
Mpc':~5 .................. i~276'i'?~6 ........... 225 .................................. 300 ................................................................................................................................................
MPC-23 02/06/96 !,240 70 1,310 '
,.
Arrulus
Open
Open
d
rvices
rilling
900 East Benson Boulevard, MB 8'1 · Anchorage, Alaska 99508
(907) 561-5111 Fax: (907) 564-5193
December 14, 1998
Wendy Mahan
Natural Resource Manager
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, AK 99501-3192
RECEIVED
Re: Annular Disposal Information Request
Dear Ms. Mahan:
DEC 14.1998
Alaska Oil & Gas Cons. Commission
Anchorage
On October 28, 1998 you requested an update from Shared Service Drilling regarding Annular
Disposal Records from July 25, 1995 through preSent time. We compared your list with Our
records and are able to provide you with the following data:
Individual Annular Disposal Logs from the SSD database which coincide with the approved
wells on your attached AOGCC Annular Log. The SSD records are provided to yOU in the
same order as listed on your log.
There were some wells on your list which were not injected.into. These wells are identified
as follows:
· Endicott wells 1-03/P-16, 1-65/N-25, 1-59/0-24
· Exploration well Pete's Wicked #1
· Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30, L-21, K-38, NMP #1 &
K-05, K-02, H-07, K-25, K-37, E-17, F-21, K-30, K-34, K-21i, F-66, K-06, K-54, K-33,
F-49i, K-18
· PBU Wells E-38, 18-34, 15-42, S-29A, 15-46, B-36, 15-43, 11-38
The reason many of these annuli were not used is because the waste materials generated frOm
these wells were injected into other approved annuli. Hopefully the injection logs submitted
with this letter will clarify this. In addition, please note that our records show: '
· The wells listed above in italics were permitted but not used for annular disposal.
· The wells listed above in BOLD were not permitted for annular disposal. Wells drilled
after June 6, 1996 were required by SSD procedure to be permitted with a Sundry "
Approval (10-403) form. Our records show that no Sundry Approval for Annular
Disposal was filed for these wells. Wells drilled between July 25, 1995 and June 6, 1996
were automatically approved for annular disposal with the Permit to Drill.
We also provide you with a cumulative report from our database of records from July 25,
1995 through the present. From those records, we show the following wells not listed on
your report were used for annular dispoSal:
.SC;ANNF-.D ! $ 2002
,Annular Disposal Letter
12/14/98
~4 · ~.~ q4-~4z, q4 - ~5'z.
· Endicott wells 1-23/O-15, 1-61/Q-20, 2-40/S-22
· Exploration well Sourdoueh ~3 - ~:oo ~4 ,~ '
· MflnePointwellsF-06, H-05, H-06, J-'13, L-24 - ~s-~
· PBU wells-18-30, 18-31, 14~,~-43, E-34, E-36, G-~A,~dS-33-'z'~°~
· hdividual logs are provided to ~ou foi these ~ogs ~ we~l.
· Finally, our records show that the B-24 outer annulus was left open (see attached
correspondence)
Thank you for the opportunity to provide clarity to these records. If I can be of any further
assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental
Advisor at 564-4305.
Sincerely,
Fritz P. Gunkel
Shared Service Drilling Manager
FPG/KMT
cc: Dave Wallace - HSE Manager (w/out attachments)
[ abed
'uedo /.6/cj ;/~ gs/cJU~ 97. 098 S~lz =IO[U 'NE:II'O[ oas c~01~!il 8~-OdlAI E]i~ sJoq
............................................... _. ...................................................... ._._ ................................................... , .................................................................................... : .............................. · ....................................................................................................................................................
uedo g6/BU~t CJB/BU~[ 06[ (Jgg g81~'1~ 8~'S 'NSU.'0t oas '-I=IN~ 6[~ "ISN 980t t~07.~ g~-OdlN ~ sJoq
................................................................... . ................................................................................................................................................................................................................................................................... : ..................... : ....................... .,, ...................................................................................................................................................................................................................................................
uedo /_6/(~/[ 96/(.;~/[ 0gL 0gl 008'[ 090'g 'NgLI'0t oas '-Fi~ ff0t~g "ISN 8g0[ H~6ff 8g-Odl/~ 3~ sJoq
uedo' 7-6/B [/t~ 96/8 [/~ 00 k gBg
~SE~ 85g'8L 809'6[ 3 ~ H:IN~ LL'g0'oeS '-IE]M,00 [ ~'-ISN,81zgE; 80gg
3/
pesolo L6/9~,1[ 96/g~/[ gS['[ 0E;g't 98Z'~ :ltz~FI 'N6.L '6~ 'oas "FL-1,7-g0g 'qS-I,gff~ 913~t~ 8# q§nopJnos Iz Ia
V(
uedo S6/LS/~L S6/gg/7. 0g 0~ 8g0'[ gg6'6g g6['[g a9~ 'Ngtl'gg oas '3~,68g~ '3NJ,0g0g tggff gg-S/0~-g gL
.... U~d6 .............. 96~ .... SB/S~[ °9 gz~'~ ...... 8['~;~ 6z8'[~ 8~'S'~ ' a9[u 'NZ[Z;8~ 3~S '~a~,20~ "qsN,sz08 98~ 0~-O/~9-~ S'~ ~o~,
peqoeoJ8 g6/LS~ S6/L8/8 0GL 68Z'6 6Z8'6 a9L~ 'N~LI'9g oas 'la~,~L L~ 'qSN,L L~g 8L0g g~-~/gg-~ 9L Uo~
'u~do ...... g6/[8~[ g6/08/6 08~ 008 09~'[ ~0'9'% ~B0'88 ag[U'NS~'98'O~S 'Ma~,ZS0~"3N~,080~ 9~ S~-O/88-~ g~ uo~,
.... u~a0 9~s~' s6/s~ 0~ .... ~% ~'L 0~'~ a9~u'N~'''~'o~s 000s ~-m/~-~ s~
snlelS PU3 l~elS ezaeJ-I eZeeJ:l' sp!nl_-I sp!nl_-I qse~ s610 '~ lelO± [uno
snlnuuv po!Jarl lesods!Q leUL-I tuno ~uJelUl uJno uJJo:l u~no Id[UOO [uno 5!1:1 [uno pnlAI uJno
N::ldO 96//-/g Z.6//_/S 08' ~
ZO'OZ ]: ^ON O]NN O
~ e6~d
uedo Z6/Lg~ 96/L~ 0gL 90~'~ 991~'Z L99't 'NL~I iBZ 'O~S 'qBM ,z90~ "15N ,996~ ZZZg g~-a 6 uo/~o(
uedo L61OLI~ 96/0~/~ 09L 0St 3~H:I 'NL L.L '9~ 'O39 SL~ [B-a 6 uo~o(
uedo . g6/Lg/~ L S6/LB/Z LBL LBB'Z[ ~99'ZL ~0LB 'NgL~'9 oes '9~]~,B09~ 'gSN,6Z6 L BZ99 g~--Icll~l 3Z~ sJoqeF
uedo (J6/LB/~L S6/9~L ~Z zgL'6 ~8~'6 :10[~ 'NS L/'9 oeS "l:l~,LgZ~ '99N,~66 L L9~B 98-_-Idl/~ 3/-~ sJoqel~
uedo 96/L8/~ L 96/G~//_ G/_ 0L /-BB'9 ~B0'/- :IOLU 'NSL±'9 oeS '9~M, B1~9~ 'gSN,Lg6 L L~99 /_B-:ldl/~ :IZ~ sJoqeF
uedo 96/~L~L 96/~L/~L 0Z 99~'9 9~G'9 ~4F1 ~0LH 'N~LI'90 oeS L~88 ZZ-~dV4 q£Z s~oqeF
uedo /_6/g~/L 96/g~/L ~/ 969' L B91z' [ ~1'1 3 ~ LB 'Ng L~'B L oeS 0B0~ 1~'B :~/~ sJoqe~
.......
uedo g6/L~L G6~L/L L 0Z GL6 986 30LB 'N~ Ll'8~ oas '3~,9888 '3SN,ZLgZ ZL L~ 9 ~-Cd~ ~ sJoqe~
uado 96/Lg~ t 96/Z t/0 L Og L 09 g~9 Z6~'C L Z~ L'ff L ~0 L ~ 'Ng LI'BZ oas '9~M.6Z L g '99N,6 L gg gCBZ g L-Cd~ ~ sJoqeh
uedo
Uedo
'%~o'
'~edo
snlelS
snlnuuv
~ode~l e^{leln~uno
966 L Jaqmeoeo I{]un S66 [ 'SZ: ~lnp
semnlOA UOmlOalul Jelnuuv
Shared SCi'/ice Dr. illing
Ann'ai~'r injection Volumes
July 25, 1995, until December 1998
Cumulative Report
Sudace
Casing Cum Mud Cum Rig Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus
Rig Inj Well Depth Legal Desc Cum Total & Ctgs Wash Fluids Fluids Freeze Freeze Start End Status
Nabors 28E B-33 3504' 969'SNL. 1898'EWL, Sec 31, T11N, R14E 3,974 2,842 857 195 80 5/1/96 12/31/96 Broached
Nabors 28E E-34 3664 168'SNL, 500'WEL, Sec 6, T11N, R14E 9,656 7,228 1.420 858 40 110 8/23/95 12/31/95 Open
Nabors 28E E-36 3648 1706'SNL. 822'WEL, Sec 6,T11N, R14E 9,271 4,417 1,293 3,096 365 100 7/25/95 12/31/95 Open
Nabors 28E E-37 3810 3391'NSL, 881'WEL, Sec 6,T11N, R14E 4,695 4,241 374 80 9/16/95 12/31/95 Open
Nabors 28E E-39 3638 3358'NSL, 501'WEL, Sec 6,T11N, R14E 2,250 928 220 1,022 80 8/28/95 12/31/95 Open
Nabors 28E G-04A 3509 2917'NSL, 1974'WEL, Sec 12,T11N, R13E 5,937 1,798 1.824 2,315 10/20/95 12/31/95 Open
Nabors 28E G-21 3509 2911'NSL, 2368'WEL. Sec 12.T11N, R14E 11,430 3,956 3,072 4,270 70 62 9/8/95 12/31/95 Open
Nabors 28E S-24 2750 1633'SNL, 4228'WEL. Sec 35,T12N, R12E 20,261 11,773 2,177 5,751 275 285 12/9/95 12/9/96 Open
Nabors 28E S-33 2958 1639'SNL. 1487'WEL, Sec 35,T12N, R12E 18,014 6,613 2.431 8,392 270 308 12/1/95 12/1/96 Open
Nabors 28E S-41 3331 4152' NSL, 4504' WEL, Sec 35,T12N, 8,062 4,159 2,034 1,754 115 2/8/96 2/8/97 Open
Nabors 28E S-42 3077 Sec 35, T12N, R12E 168 100 68 3/13/96 3/13/97 Open
..N.~.b....o..?..~...E..s.. .................. ..H.:..3..5.. ........................................ _3.!..5_...7. .............................. .4...5...3..5...,..~ S .L..,...!..~ .6..6_'..W....E_L..,.....s...e...c.....2..!.., T..!_ !,..N..,_ .R..!.~.~ ........... _4_,.8._6~0 .......................... ~,..7_2..5' ............................ _5_5..5_ .............. _4..8...0.. .............................................................................. .2..0 ........................... .8_0. ........... !..0..!~!~ .................... !.?.3..!../..9_5_ ................ _Op__~en_ .....
Nabors 2ES H-36 3550 4478'NSL, 1265'WEL, Sec 21 T11N R13E 1,452 857 100 410 85 10/26/95 12/31/95 Open
Page 3
SCANNED NOV .'l 3 2[11)"~ '
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON' OR BEFORE
JANUARY 03,.
2001
P
M
L
A T
E
E
IA L UN
W
D
E R
T H
C LLORIXMlqLM.DOC '
ISM
A R K E R
9 6 .... 0 0 1
"F--'.;",P EWRa. D ~"i95 i5z83
D G R / ,,,. /" .. -'-- k'J -,- ""
-~I~WR4. TVD
DG R ,~ - ---
D G R/S L. D ./C i'.,! 0 .... Pi D
r) G E / S !... D / C i",! 0 ...... T V D
1 - ?.,. 0 {.ii/' 0 3/' !i E~
R e c e :i v :-.':- d ? y ::: ~---m:
PLUGGING~ ·
LOCATION
CLEAPj ..... !'CE
REPORT
State of Alaska
.ALASF~ OIL & GA~ CONSERVATION COMMISSION
-.
.X, emc rand-.:-m To
File:
Abnd Date
Comp i e t ad
Nots casing size, wt, depth, cmt vol, & procedure.
Sfc Csq:
Perf i-~a_~-za!s - tops:
Review the well file, and' c~r~ment on plugging, well head
Well head cut off:
Code
Signed
Date
STATE OF ALASKA '
ALASk,., OIL AND GAS CONSERVATION CL,.vlMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
:2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 96-001 96-017
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22638
4. Location of well at surface ¢~~ 9. Unit or Lease Name
1143' NSL, 2436' WEL, SEC. 10, T13N, R10E. _~.. . Milne Point Unit
At top of productive interval ~ ¥¢l~A. 10. Well Number
N/A!~ ~ MPC-25
At total depth i 11. Field and Pool
2382' NSL, 4638' WEL, SEC. 34, T14N, R10E Milne Point Unit / Kuparuk River
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands
KBE = 47.2'I ADL 355017
12. Date Spudded01/14/96 I13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °ffsh°re 16' N°' °f c°mpleti°ns01/24/96 01/26/96 N/A MSL Zero
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)I19. Directional Survey 20. Depth where SSSV set,_1. Thickness of Permafrost
15283 7723 FTI 8617 4681 FTI [~Yes []No N/A MD! 1800' (Approx.)
22. Type Electric or Other Logs Run
Gyro, MWD, LWD, GR/RES
23. CASING, LINER AND CEMENTING RECORD
CASING SE'Iq'lNG DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO-FrOM SiZE CEMENTING RECORD AMOUNT PULLED
20" 91.1# H-40 32' 112' 24" 250 sx Arcticset I (Approx.)
9-5/8" 40# L-80 31' 8595' 12-1/4" 11650 sx PF 'E', 250 sx 'G', 105 sx PF 'E'
24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD
and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None N/A
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
15280' P & A, 82 bbls Class 'G'
8617' Kickoff Plug, 47 bbls Class 'G'
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
Not on Production I N/A
Date of Test Hours Tested PRODUCTION FOR O~L-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD ·
I
Flow Tubing Casing Pressure CALCULATEDo O~L-BBL GAS-MCF WATER-BBL OIL GRAVIS-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
R CF VED
Form 10-407 Rev. 07-01-80 Submit In Duplicate
Geologic Mark~.. 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name Depth Depth and gravity, GOR, and time of each phase.
(Subsea)
Top Kuparuk 'C' 14710' 7229'
Top Kuparuk 'B' 14743' 7254'
Top Kuparuk 'A' 14865' 7349'
Top Kuparuk A3 14874' 7356'
Top Kuparuk A2 14896' 7373'
Top Kuparuk A1 14944' 7410'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys, Annular Pumping Report
32. I hereby certify that the foregoing is tru~ and correct to the best of my knowledge
· ,
Signed 'RmSchofield /i.¥Y) '-~ C~"I~/.,~~ Title Senior Drilling Engineer Date j'
Prepared By Name/Number: Kathy Campo,~mdr, 564-5122
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Z~ -' 96, 1£: 1SPl',l BP EXPLORAT'f'or-.I P. P
/~.~ ~..
SUMMARY OF DAILY OPERATIONS
SHARED SERVICES DRILLING - BPX / ARCO
Well Name: M PC-26 Rig Name: N-22E AFE: 337006
Accept Date: 01/1 3/96 Spud Date: 01/1 4/96 Release Date; 05/0_4/96
Jan 14 1996 (1)
Held safety meeting. Nabors rig #22E moved 100 %.
Jan 15 1996 (2)
Held safety meeting. MU BHA #1. Tested, divertor. Drilled to 2214 ft. Held drill (kick
while drilling). Circulated at 2214 ft.
Jan 16 1996 (3)
Circulated at 2214 ft, POOH to 256 ft. RIH to 2214 ft, Held drill (fire). Drilled to 4023
ft. Circulated at 402.3 ft. Held drill (spill), POOH to 256 ft. Pulled BHA. Serviced rfg
services. RIH lo 2.56 ft.
Jan 17 1996 (4)
Held safety meeting. RIH to 4023 ff. Held drill (H~S), Drilled to 6305 ff. Circulated at
6305 ft. POOH to 4000 ff. RIH to 6305 ft, Drilled to 6687 ff,
Jan 18 1996 ($)
Held safety meeting. Drilled to 7549 ff. Serviced mud pumps, Drilled to 8615 ff,
Jan 19 1996 (6)
Cimulated at 8615 ff. POOH to 1100 ft, RIH to 8615 ff, Circulated at 8615 ft. Held
safety meeting. Held drill (H~.S), POOH to 256 ff. Pulled BHA. RU casing handling
equipment. Held safety meeting, Ran casing to 2500 ff (9,625 in OD),
Jan 20 1996 (7)
Ran casing to 7720 ff (9.625 in OD), Repaired lines / cables. Ran casing to 8595 ft
(9.625" OD). Circulated at 8595 ft, Repaired mud pumps, Mixed and pumped slurry-
690 bbl. Wait on cement, Mixed and pumped slurry- 40 bbl. RD divertor,
Page i
Jan 21 1996 (8)
Held safety meeting, RD divertor, Installed casing spool. RU BOP stack, Tested
BOP stsck, Removed BOP test plug assembly, MU BHA#3, RIH to 3300 ft.
Serviced block line, RIH to 8515 ft, Held drill (kick while tripping), Tested casing,
Drilled installed equipment - float collar, Performed formation integrity test, Ddlled to
8902 ft,
Jan 22 1996 (9)
Held safety meeting, Held drill (fire). Drilled to 10810 ft. Circulated at 10810 ft, POOH
to 8595 fi. Serviced top drive.
Jan 23 1996 (10)
Held safety meeting, Held drill (kick while drilling), FIIH to 10810 ft. Drilled to 13073 ft,
Jan 24 1996 (11)
Held safety meeting, Circulated at 13073 ft, POOH to 10800 ft, RIH to 13073 ft, Held
drill (H~.S), Drilled to 14340 ft,
Jan 25 1996 (12}
Held safety meeting, Circulated at 14340 ft, POOH to I3079 ft. RIH to 14340 ft,
Drilled to 14395 ft. Held drill (kick while drilling), Drilled to 15007 ft, Held safety
meeting, Held drill (spill), Drilled to 15283 ff, Circulated at 15283 ft, POOH to 1105 ft,
Serviced block line.
Jan 26 1996 (15)
Held safety meeting. Serviced block line. POOH to 256 ft, Downloaded MWD tool,
Pulled BHA, RU drillstring handling equipment, RIH to 9500 ft. Held drill (kick while
tripping). Held drill (fire). RIH to 15288 ft, Circulated at 15280 ff, Mixed and pumped
slurry - 81,9 bbl, abandonment plug, Pulled drillpipe in stands to 13888 ft, Circulated
at 13888 ff. Pulled driilpipe In stands to 9212 ft, Circulated at 9212 ft. Mixed and
pumped slurry- 47 bbl, kick-off plug. Pulled ddllpipe in stands to 8170 ff, Pulled
drillpipe in stands to 4000 ft.
Jan 27 1996 (14)
Held safety meeting. LD drillpipe of 1500 fi, RU Gyro survey instruments, RD
additional services, Tested BOP stacK, Held safety meeting, Tested BOP stack. RU
additional services, MU BHA#4. Serviced top drive, RIH to 8290 ff. Drilled cement
to 8400 ff.
Page 2
S~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
~£ EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
MWD SURVEY
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
.00 .00 -45.45
176.58 176.58 131.13
262.91 262.91 217.46
352.19 352.18 306.73
443.50 443.47 398.02
0 0 N .00 E .00 .00N .00E
0 16 S 41.27 E .16 .32S .28E
0 1 S 40.24 E .29 .50S .44E
0 50 N 1.52 E .97 .14N .47E
1 47 N 4.06 W 1.06 2.24N .39E
.00
- .36
- .55
.07
2.17
534.29 534.20 488.75
625.16 624.96 579.51
717.01 716.60 671.15
807.75 806.98 761.53
898.35 897.10 851.'65
2 17 N .32 W .57 5.48N .28E
3 11 N 4.18 W 1.00 9.82N .08E
4 28 N 13.85 W 1.57 15.86N .96W
5 38 N 17.67 W 1.33 23.55N 3.17W
6 5 N 13.61 W .68 32.47N 5.65W
5.40
9.73
15.85
23.76
32.92
987.27 985.40 939.95
1082.36 1079.43 1033.98
1176.59 1171.97 1126.52
1271.71 1264.72 1219.27
1366.66 1356.60 1311.15
7 22 N 15.61 W 1.46 42.56N 8.30W
9 36 N 18.09 W 2.38 55.99N 12.41W
12 1 N 18.61 W 2.57 72.77N 17.98W
13 33 N 17.76 W 1.62 92.78N 24.55W
15 36 N 16.92 W 2.16 115.60N 31.66W
43.27
57.11
74.47
95.16
118.70
1465.03 1450.74 1405.29
1560.60 1541.02 1495.57
1654.91 1629.43 1583.98
1749.83 1717.88 1672.43
1845.26 1805.43 1759.98
18 1 N 16.21 W 2.47 142.86N 39.75W
20 13 N 17.62 W 2.36 172.80N 48.88W
20 30 N 17.24 W .32 204.12N 58.71W
22 2 N 14.96 W 1.84 237.20N 68.24W
24 49 N 14.46 W 2.93 273.91N 77.86W
146.77
177.64
209.95
243.98
281.62
1940.07 1890.43 1844.98
2035.62 1974.06 1928.61
2127.48 2052.78 2007.33
2226.00 2135.41 2089.96
2320.93 2213.03 2167.58
27 44 N 12.96 W 3.15 314.69N 87.79W
30 4 N 12.52 W 2.45 359.73N 97.96W
31 57 N 12.19 W 2.05 405.96N 108.08W
34 0 N 11.72 W 2.11 458.42N 119.18W
36 15 N 12.16 W 2.39 511.85N 130.49W
323.34
369.31
416.45
469.90
524.34
2416.11 2288.39 2242.94
2511.77 2361.16 2315.71
2607.24 2430.65 2385.20
2701.80 2496.91 2451.46
2796.80 2561.07 2515.62
39 1 N 13.32 W 3.00 568.54N 143.33W
41 53 N 12.99 W 3.00 628.98N 157.45W
44 40 N 14.08 W 3.03 692.61N 172.78W
46 20 N 15.42 W 2.03 757.83N 189.96W
48 40 N 16.24 W 2.54 825.21N 209.08W
582.21
643.96
709.02
775.91
845.18
2892.97 2622.65 2577.20
2988.11 2679.69 2634.24
3083.45 2733.10 2687.66
3178.79 2782.77 2737.32
3272.53 2827.46 2782.01
51 40 N 16.53 W 3.13 896.06N 229.91W
54 37 N 15.72 W 3.17 969.20N 251.05W
57 13 N 15.79 W 2.72 1045.20N 272.49W
59 58 N 16.09 W 2.91 1123.44N 294.84W
63 4 N 15.84 W 3.30 1202.65N 317.50W
918.11
993.35
1071.47
1151.92
1233.38
S~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
~P EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
MWD SURVEY
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45
OPERATOR: BP EXPLORATION
FT.
.TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
3367.74 2868.18 2822.73
3463.52 2903.76 2858.31
3558.95 2934.99 2889.54
3654.33 2965.56 2920.11
3752.25 2999.48 2954.03
66 16
70 5
71 41
70 55
68 31
N 15.78 W 3.37 1285.44N 340.94W
N 15.51 W 4.00 1371.06N 364.91W
N 15.51 W 1.67 1457.94N 389.03W
N 17.10 W 1.77 1544.65N 414.39W
N 17.41 W 2.48 1632.34N 441.62W
1318.50
1406.47
1495.73
1584.97
1675.43
3846.67 3034.70 2989.25
3939.05 3068.49 3023.04
4036.55 3101.99 3056.54
4132.26 3135.70 3090.25
4226.51 3170.72 3125.27
67 40
69 24
70 24
68 20
68 1
N 16.57 W 1.21 1716.12N 467.22W
N 17.16 W 1.95 1798.39N 492.17W
N 16.25 W 1.36 1886.08N 518.48W
N 16.94 W 2.27 1971.91N 544.06W
N 15.73 W 1.24 2055.88N 568.67W
1761.79
1846.58
1936.92
2025.31
2111.73
4323.64 3207.02 3161.57 68 4
4417.20 3242.28 3196.83 67 38
4510.73 3276.47 3231.02 69 28
4606.05 33.09.72 3264.27 69 41
4701.46 3343.10 3297.65 69 20
N 15.78 W .07 2142.59N 593.13W
N 14.76 W 1.11 2226.18N 615.95W
N 15.12 W 1.99 2310.28N 638.39W
N 14.64 W .53 2396.62N 661.33W
N 15.11 W .60 2483.00N 684.28W
2200.86
2286.69
2372.97
2461.53
2550.14
4798.32 3376.02 3330.57 70 55
4891.73 3406.81 3361.36 70 35
4988.18 3439.23 3393.78 70 7
5081.37 3470.72 3425.27 70 23
5177.75 3503.04 3457.59 70 25
N 14.96 W 1.64 2570.97N 707.91W
N 14.81 W .38 2656.20N 730.56W
N 15.15 W .59 2743.95N 754.04W
N 15.31 W .33 2828.58N 777.08W
N 15.69 W .37 2916.07N 801.34W
2640.41
2727.84
2817.87
2904.75
2994.63
5272.22 3535.33 3489.88 69 36
5369.00 3568.52 3523.07 70 16
5464.19 3601.11 3555.66 69 41
5557.29 3632.53 3587.08 70 51
5652.60 3663.98 3618.53 70 35
N 15.90 W .88 3001.50N 825.51W
N 15.77 W .69 3088.96N 850.31W
N 16.83 W 1.21 3174.80N 875.41W
N 16.12 W 1.45 3258.83N 900.26W
N 16.64 W .58 3345.15N 925.64W
3082.45
3172.36
3260.70
3347.22
3436.08
5749.40 3696.58 3651.13 70 2
5843.79 3728.83 3683.38 70 0
5938.58 3761.60 3716.15 69 31
6033.95 3794.40 3748.95 70 14
6131.68 3828.27 3782.82 69 12
N 16.41 W .62 3432.53N 951.56W
N 15.61 W .80 3517.80N 976.03W
N 15.48 W .52 3603.48N 999.86W
N 13.77 W 1.84 3690.13N 1022.47W
N 13.07 W 1.25 3779.29N 1043.75W
3526.06
3613.75
3701.79
3790.61
3881.76
6223 . 57 3860 . 47 3815 . 02
6318 . 78 3893 . 80 3848 . 35
6412.64 3927.25 3881.80
6508 . 37 3961 . 94 3916.49
6606.56 3996.88 3951.43
69 45
69 15
68 58
68 31
69 46
N 12.90 W .62 3863.15N 1063.08W
N 12.76 W .54 3950.11N 1082.89W
N 11.28 W 1.50 4035.88N l101.15W
N 11.10 W .50 4123.40N 1118.47W
N 11.37 W 1.29 4213.40N 1136.34W
3967.41
4056.19
4143.58
4232.61
4324.15
S.~'~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
~£ EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
MWD SURVEY
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTI~/SOUTI{ EAST/WEST
VERT.
SECT.
6700.20 4029.74 3984.29
6796.86 4063.59 4018.14
6893.69 4097.32 4051.87
6987.35 4130.92 4085.47
7083.64 4166.20 4120.75
69 9
69 50
69 22
68 35
68 25
N 10.88 W .82 4299.44N 1153.26W
N 9.75 W 1.31 4388.51N 1169.47W
N 8.69 W 1.14 4478.09N 1184.02W
N 8.65 W .83 4564.52N 1197.19W
N 8.56 W .20 4653.10N 1210.60W
4411.65
4502.06
4592.77
4680.17
4769.74
7179.10 4200.89 4155.44
7276.15 4234.85 4189.40
7371.23 4267.47 4222.02
7465.25 4299.61 4254.16
7561.13 4331.98 4286.53
68 57
70 4
69 47
70 13
70 18
N 6.67 W 1.93 4741.24N 1222.38W
N 6.65 W 1.15 4831.54N 1232.92W
N 6.67 W .31 4920.24N 1243.28W
N 7.40 W .87 5007.93N 1254.10W
N 7.40 W .07 5097.43N 1265.73W
4858.66
4949.56
5038.87
5127.22
5217.47
7656.80 4364.79 4319.34
7750.37 4397.80 4352.35
7844.79 4430.19 4384.74
7940.38 4461.50 4416.05
8035.45 4492.41 4446.96
69 35
69 5
70 45
71 0
71 3
N 7.57 W .76 5186.53N 1277.43W
N 7.73 W .55 5273.30N 1289.09W
N 7.32 W 1.80 5361.22N 1300.70W
N 7.63 W .40 5450.76N 1312.45W
N 7.63 W .06 5539.88N 1324.39W
5307.33
5394.89
5483.56
5573.88
5663.78
8130.17 4523.22 4477.77
8225.42 4554.42 4508.96
8321.01 4585.88 4540.43
8416.15 4617.40 4571.95
8532.00 4655.02 4609.57
70 58
70 46
70 46
70 31
71 34
N 7.04 W .60 5628.71N 1335.82W
N 8.16 W 1.13 5717.91N 1347.72W
N 9.49 W 1.31 5807.10N 1361.57W
N 9.78 W .39 5895.60N 1376.60W
N 8.59 W 1.32 6003.76N 1394.08W
5753.35
5843.34
5933.57
6023.27
6132.77
8605.13 4677.74 4632.29
8701.13 4707.38 4661.93
8796.32 4737.23 4691.78
8891.80 4767.48 4722.03
8986.34 4797.77 4752.32
72 13
71 49
71 37
71 26
71 10
N 9.16 W 1.16 6072.43N 1404.80W
N 8.63 W .67 6162.64N 1418.92W
N 9.03 W .45 6251.96N 1432.80W
N 9.70 W .69 6341.31N 1447.53W
N 10.45 W .81 6429.49N 1463.20W
6202.25
6293.53
6383.89
6474.39
6563.84
9082.76 4829.17 4783.72
9178.47 4861.56 4816.11
9271.96 4894.37 4848.92
9369.16 4929.10 4883.65
9464.25 4963.97 4918.52
70 49
69 36
69 18
68 48
68 10
N 11.09 W .72 6519.04N 1480.23W
N 10.21 W 1.53 6607.54N 1496.88W
N 9.15 W 1.11 6693.84N 1511.60W
N 6.60 W 2.50 6783.74N 1524.04W
N 5.87 W .98 6871.68N 1533.65W
6654.84
6744.75
6832.22
6922.97
7011.42
9559.77 5000.04 4954.59
9655.37 5037.45 4992.00
9750.67 5075.19 5029.73
9847.69 5112.77 5067.32
9941.13 5147.08 5101.63
67 26
66 28
66 52
67 32
69 22
N 5.80 W .76 6959.67N 1542.64W
N 6.02 W 1.04 7047.17N 1551.70W
N 5.55 W .61 7134.24N 1560.52W
N 7.27 W 1.77 7223.11N 1570.51W
N 6.70 W 2.05 7309.37N 1581.07W
7099.83
7187.78
7275.25
7364.67
7451.57
S~RRY-SUN DRILLING SERVICES ·
ANCHORAGE ALASKA
PAGE 4
~£ EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
MWD SURVEY
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUT}t EAST/WEST
VERT.
SECT.
10036.35 5179.50 5134.05 70 48
10131.60 5210.96 5165.51 70 37
10227.25 5243.22 5197.77 69 56
10321~.68 5275.95 5230.50 69 30
10417.31 5308.78 5263.33 70 20
N 6.92 W 1.51 7398.26N 1591.69W
N 7.60 W .70 7487.44N 1603.05W
N 8.44 W 1.10 7576.60N 1615.61W
N 9.56 W 1.21 7664.08N 1629.46W
N 8.57 W 1.32 7752.77N 1643.61W
7541.09
7630.99
7721.03
7809.56
7899.34
10513.35 5341.43 5295.98 69 54
10608.65 5374.63 5329.18 69 19
10704.77 5408.59 5363.14 69 18
10798.39 5440.76 5395.31 70 30
10892.58 5472.42 5426.97 70 13
N 6.30 W 2.27 7842.31N 1655.30W
N 6.65 W .70 7931.07N 1665.37W
N 7.34 W .67 8020.32N 1676.32W
N 8.35 W 1.63 8107.41N 1688.32W
N 9.03 W .74 8195.10N 1701.73W
7989.64
8078.96
8168.87
8256.78
8345.46
10985.03 5504.13 5458.68
11081.05 5537.57 5492.12
11175.70 5570.76 5525.31
11269.72 5603.97 5558.52
11362.65 5636.17 5590.72
69 39
69 34
69 22
69 15
70 11
N 8.05 W 1.17 8280.97N 1714.62W
N 8.01 W .09 8370.10N 1727.20W
N 6.81 W 1.21 8458.00N 1738.63W
N 7.01 W .23 8545.32N 1749.21W
N 6.01 W 1.42 8631.92N 1759.09W
8432.28
8522.29
8610.92
8698.88
8786.03
11456.10 5667.99 5622.54 69 59
11551.44 5700.88 5655.43 69 39
11647.17 5734.10 5688.65 69 44
11740.97 5766.90 5721.45 69 19
11833.99 5799.90 5754.45 69 6
N 6.40 W .45 8719.27N 1768.59W
N 7.25 W .91 8808.12N 1779.22W
N 8.38 W 1.11 8897.06N 1791.43W
N 7.80 W .73 8984.07N 1803.80W
N 8.09 W .38 9070.20N 1815.82W
8873.88
8963.36
9053.13
9141.01
9227.97
11929.04 5833.60 5788.15
12022.59 5866.58 5821.13
12117.35 5899.96 5854.51
12211.50 5933.16 5887.71
12306.58 5967.02 5921.57
69
69
69
69
68
20
22
22
19
57
N 5.81 W 2.26 9158.40N 1826.57W
N 6.09 W .28 9245.47N 1835.64W
N 4.43 W 1.64 9333.78N 1843.77W
N 4.40 W .07 9421.62N 1850.55W
N 4.52 W .40 9510.20N 1857.46W
9316.82
9404.34
9492.96
9580.94
9669.68
12399.90 6000.71 5955.26 68 42
12493.87 6034.71 5989.26 68 52
12586.83 6068.27 6022.82 68 48
12680.59 6102.13 6056.68 68 50
12775.67 6136.17 6090.72 69 11
N 4.96 W .51 9596.92N 1864.65W
N 6.14 W 1.18 9684.11N 1873.13W
N 5.82 W .33 9770.33N 1882.16W
N 4.74 W 1.08 9857.39N 1890.20W
N 5.13 W .52 9945.83N 1897.84W
9756.61
9844.17
9930.83
10018.21
10106.90
12869.15 6169.34 6123.89 69 14
12962.45 6202.31 6156.86 69 22
13060.64 6238.75 6193.30 67 3
13158.42 6278.09 6232.64 65 30
13252.92 6319.14 6273.69 63 0
N 4.39 W .74 10032.93N 1905.09W
N 4.89 W .52 10119.92N 1912.15W
N 4.95 W 2.36 10210.74N 1919.97W
N 6.61 W 2.22 10299.79N 1928.98W
N 7.31 W 2.73 10384.27N 1939.29W
10194.21
10281.39
10372.46
10461.93
10547.04
S~-~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
~P EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
MWD SURVEY
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS
INCLN DIRECTION
DG MN DEGREES DG/10
TOTAL
RECTANGUI. JLR COORDINATES
0 NORTH/SOUTH EAST/WEST
VERT.
SECT.
13346.72 6363.37 6317.92 60 43 N 7.84 W 2.
13443.50 6411.98 6366.53 58 58 N 8.74 W 1.
13536.34 6461.24 6415.79 56 55 N 9.62 W 2.
13630.17 6513.98 6468.53 54 39 N 8.86 W 2.
13724.64 6569.98 6524.53 52 37 N 8.55 W 2.
48 10466.24N
97 10549.04N
36 10626.71N
50 10703.28N
18 10778.47N
1950.18W 10629.73
1962.24W 10713.39
1974.79W 10792.03
1987.25W 10869.56
1998.77W 10945.61
13821.62 6629.60 6584.15 51 30 N 10.61 W 2.
13914.19 6688.52 6643.07 49 24 N 10.41 W 2.
14007.99 6750.99 6705.54 47 2 N 10.09 W 2.
14102.15 6816.76 6771.31 44 20 N 11.36 W 3.
14194.60 6884.15 6838.70 42 2 N 11.70 W 2.
03 10853.88N
27 10924.06N
54 10992.88N
03 11059.07N
50 11121.06N
2011.48W 11022.02
2024.50W 11093.29
2036.95W 11163.14
2049.47W 11230.39
2062.11W 11293.49
14290.10 6955.41 6909.96 41 27 N 11.93 W .
14385.05 7026.77 6981.32 41 5 N 11.52 W .
14479.40 7098.12 7052.67 40 37 N 11.69 W .
14573.40 7169.71 7124.26 40 9 N 12.19 W .
14669.08 7242.90 7197.45 40 2 N 11.62 W .
64 11183.30N
47 11244.62N
51 11305.09N
61 11364.69N
40 11424.99N
2075.13W 11356.88
2087.86W 11419.33
2100.28W 11480.89
2112.88W 11541.61
2125.59W 11603.04
14762.39 7314.55 7269.10 39 37 N 11.48 W .
14856.33 7387.24 7341.79 39 0 N 11.85 W .
14951.69 7461.62 7416.17 38 28 N 12.19 W .
15045.41 7535.27 7489.82 37 55 N 11.20 W .
15140.61 7610.47 7565.02 37 43 N 11.54 W .
46 11483.55N
71 11541.83N
60 11600.19N
87 11656.94N
31 11714.18N
2137.56W 11662.65
2149.59W 11721.99
2162.02W 11781.46
2173.77W 11839.25
2185.28W 11897.49
15175.77 7638.33 7592.88 37 25 N 11.39 W
15283.00 7723.50 7678.05 37 25 N 11.39 W
.89 11735.19N 2189.54W 11918.87
.02 11799.06N 2202.41W 11983.87
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 12002.85 FEET
AT NORTH 10 DEG. 34 MIN. WEST AT MD = 15283
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 352.65 DEG.
S"~RRY-SUN DRILLING SERVICES
ANC~{ORAGE ALASKA
PAGE 6
~P EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -45.45 .00 N .00 E
1000.00 998.03 952.58 44.13 N 8.74 W
2000.00 1943.23 1897.78 342.31 N 94.09 W
3000.00 2686.55 2641.10 978.55 N 253.68 W
4000.00 3089.73 3044.28 1853.03 N 508.85 W
.00
1.97 1.97
56.77 54.80
313.45 256.68
910.27 - 596.82
5000.00 3443.25 3397.80 2754.68 N 756.94 W
6000.00 3782.92 3737.47 3659.09 N 1014.86 W
7000.00 4135.54 4090.09 4576.16 N 1198.97 W
8000.00 4480.90 4435.45 5506.64 N 1319.93 W
9000.00 4802.18 4756.73 6442.20 N 1465.54 W
1556.75 646.48
2217.08 660.33
2864.46 647.39
3519.10 654.63
4197.82 678.72
10000.00 5167.54 5122.09 7364.18 N 1587.55 W
11000.00 5509.33 5463.88 8294.87 N 1716.59 W
12000.00 5858.62 5813.17 9224.45 N 1833.40 W
13000.00 6215.54 6170.09 10154.93 N 1915.15 W
14000.00 6745.55 6700.10 10987.12 N 2035.93 W
4832.46 634.63
5490.67 658.21
6141.38 650.71
6784.46 643.08
7254.45 469.99
15000.00 7499.45 7454.00 11629.56 N 2168.35 W
15283.00 7723.50 7678.05 11799.06 N 2202.41 W
7500.55 246.10
7559.50 58.96
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
~RRRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 7
DP EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -45.4
45.45 45.45 .0
145.45 145.45 100.0
245.45 245.45 200.0
345.46 345.45 300.0
5 .00 N .00
0 .00 N .00
0 .21 S .18
0 .49 S .43
0 .04 N .47
E .00
E .00 .00
E .00 .00
E .00 .00
E .01 - .00
445.48 445.45 400.0
545.55 545.45 500.0
645.68 645.45 600.0
745.95 745.45 700.0
846.41 845.45 800.0
2.30 N .38 E .03 .03
5.93 N .27 E .10 .07
10.96 N .00 W .23 .13
18.05 N 1.50 W .50 .27
27.19 N 4.31 W .96 .46
946.99 945.45 900.0
1047.89 1045.45 1000.0
1149.48 1145.45 1100.0
1251.89 1245.45 1200.0
1355.09 1345.45 1300.0
37.61 N 6.92 W
50.52 N 10.62 W
67.41 N 16.18 W
88.36 N 23.13 W
112.62 N 30.75 W
1.54 .58
2.44 .91
4.03 1.58
6.44 2.41
9.64 3.20
1459.47 1445.45 1400.0
1565.32 1545.45 1500.0
1672.01 1645.45 1600.0
1779.67 1745.45 1700.0
1889.62 1845.45 1800.0
141.21 N 39.27 W
174.36 N 49.38 W
209.84 N 60.49 W
248.22 N 71.17 W
292.46 N 82.51 W
14.02 4.38
19.87 5.86
26.56 6.69
34.22 7.66
44.17 9.95
2002 . 56 1945 . 45 1900 . 0
2118 . 84 2045 . 45 2000 . 0
2238 . 11 2145 . 45 2100 . 0
2361.45 2245.45 2200.0
2490.79 2345.45 2300.0
343.56 N 94.37 W
401.49 N 107.12 W
465.05 N 120.56 W
535.59 N 135.72 W
615.44 N 154.31 W
57.11 12.95
73.39 16.28
92.66 19.27
116.00 23.34
145.34 29.34
2628.05 2445.45 2400.0
2773.14 2545.45 2500.0
2930.26 2645.45 2600.0
3106.49 2745.45 2700.0
3313.27 2845.45 2800.0
706.80 N 176.34 W
808.15 N 204.11 W
924.37 N 238.22 W
1063.92 N 277.80 W
1237.81 N 327.47 W
182.60 37.26
227.69 45.10
284.81 57.11
361.04 76.24
467.82 106.77
3592.24 2945.45 2900.0
3874 . 99 3045 . 45 3000 . 0
4158.69 3145.45 3100.0
4425.54 3245.45 3200.0
4708.12 3345.45 3300.0
1488.39 N 397.48
1741.23 N 474.69
1995.41 N 551.21
2233.64 N 617.92
2489.02 N 685.90
W 646.79 178.97
W 829.54 182.75
W 1013.24 183.70
W 1180.09 166.85
W 1362.67 182.58
S~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 8
~P EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
5006.46 3445.45 3400.00
5301.28 3545.45 3500.00
5596.70 3645.45 3600.00
5892.29 3745.45 3700.00
6180.16 3845.45 3800.00
2760.54 N
3027.70 N
3294.60 N
3561.68 N
3823.45 N
758.53 W
832.97 W
910.60 W
988.28 W
1053.99 W
1561.01 198.34
1755.83 194.82
1951.25 195.42
2146.84 195.60
2334.71 -~ 187.86
6463.32 3945.45 3900.00
6744.43 4045.45 4000.00
7027.15 4145.45 4100.00
7307.27 4245.45 4200.00
7601.06 4345.45 4300.00
4082.26 N
4340.04 N
4601.15 N
4860.60 N
5134.70 N
1110.39 W
1161.02 W
1202.76 W
1236.31 W
1270.57 W
2517.87 183.16
2698.98 181.11
2881.70 182.72
3061.82 180.13
3255.61 193.78
7891.13 4445.45 4400.00
8198.19 4545.45 4500.00
8501.74 4645.45 4600.00
8822.37 4745.45 4700.00
9131.98 4845.45 4800.00
5404.62 N
5692.46 N
5975.37 N
6276.38 N
6564.64 N
1306.30 W
1344.07 W
1389.79 W
1436.68 W
1489.09 W
3445.68 190.08
3652.74 207.05
3856.29 203.55
4076.92 220.63
4286.53 209.60
9414.31 4945.45 4900.00
9675.41 5045.45 5000.00
9936.51 5145.45 5100.00
10233.74 5245.45 5200.00
10525.05 5345.45 5300.00
6825.56 N
7065.45 N
7305.08 N
7582.63 N
7853.24 N
1528.85 W
1553.62 W
1580.57 W
1616.50 W
1656.50 W
4468.86 182.34
4629.96 161.10
4791.06 161.10
4988.29 197.23
5179.60 191.31
10812.43 5445.45 5400.00
11103.63 5545.45 5500.00
11390.04 5645.45 5600.00
11679.94 5745.45 5700.00
11962.63 5845.45 5800.00
8120.51 N
8391.06 N
8657.55 N
8927.48 N
9189.67 N
1690.25 W
1730.15 W
1761.79 W
1795.91 W
1829.75 W
5366.98 187.38
5558.18 191.20
5744.59 186.40
5934.49 189.90
6117.18 182.69
12246.29 5945.45 5900.00
12523.67 6045.45 6000.00
12801.80 6145.45 6100.00
13077.81 6245.45 6200.00
13310.07 6345.45 6300.00
9454.07 N
9711.74 N
9970.16 N
10226.49 N
10434.57 N
1853.05 W
1876.10 W
1900.03 W
1921.34 W
1945.82 W
6300.84 183.66
6478.21 177.38
6656.35 178.13
6832.36 176.02
6964.62 132.26
13507.42 6445.45 6400.00
13684.24 6545.45 6500.00
13847.09 6645.45 6600.00
13999.85 6745.45 6700.00
14142.21 6845.45 6800.00
10602.82 N
10746.72 N
10873.48 N
10987.02 N
11086.49 N
1970.74 W
1993.99 W
2015.15 W
2035.91 W
2054.98 W
7061.97 97.34
7138.79 76.82
7201.64 62.86
7254.40 52.76
7296.76 42.35
~.RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE PT/MPC-25
500292263800
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/21/96
DATE OF SURVEY: 012496
JOB NUMBER: AK-MM-960101
KELLY BUSHING ELEV. = 45.45 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
14276.82 6945.45 6900.00 11174.69 N 2073.31 W 7331.37 34.61
14409.84 7045.45 7000.00 11260.59 N 2091.12 W 7364.39 33.03
14541.66 7145.45 7100.00 11344.68 N 2108.56 W 7396.21 31.82
14672.42 7245.45 7200.00 11427.10 N 2126.03 W 7426.97 30.76
14802.49 7345.45 7300.00 11508.59 N 2142.65 W 7457.04 -- 30.07
14931.04 7445.45 7400.00 11587.63 N 2159.30 W 7485.59 28.55
15058.32 7545.45 7500.00 11664.72 N 2175.31 W 7512.87 27.28
.
15184.73 7645.45 7600.00 11740.53 N 2190.61 W 7539.28 26.41
15283.00 7723.50 7678.05 11799.06 N 2202.41 W 7559.50 20.22
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
gyro/data
B.P. EXPLORATION ~
C PAD, WELL NO. MPC-25
MILNE POINT FIELD, ALASKA
Gyro Multishot Survey Of Drill Pipe
Survey date: 26 January, 1996
G-ool
Job number · AK0196G319
SR319.DOC
Gyrodata IncorPorated
P.O. Box 79389
Houston, Texas 77279
713/461-3146
Fax: 713/461-0920
February 13, 1996
B.P. Exploration (Alaska) Inc.
Petrotechnical Data Center, MB 3-3
900 E. Benson Blvd.
Anchorage, AK 99519-6612
Re;
C-PAD, WELL MPC-25, MILNE POINT FIELD, ALASKA
Enclosed please find one (1) original (6) copies and (1) disk of the completed survey of Well
#MPC-25
We would like to take this opportunity to thank you for using Gyrodata and we look forward
to serving you in the future.
Sincerely
Robert J. Shoup
Operations Manager
RS/fec
Serving the Worldwide Energy Industry with Precision Survey Instrumentation
gyro/data
CONTENTS
JOB NUMBER :AK0196G319
1. DISCUSSION, SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR319.DOC
gyro/data
1. DISCUSSION , SURVEY CERTIFICATION SHEET
SR319.DOC
gym/data
DISCUSSION
JOB NUMBER' AK0196G319
Tool 080 was run in MPC-25 on ATLAS 5/16" Wireline inside drillpipe. The survey was run without
problems.
SR319. DOC
gyro/data
SURVEY CERTIFICATION SHEET
JOB NUMBER: AK0196G319
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the wellsite.
Checked by :-
ROB SHOUP
OPERATIONS MANAGER
SR319.DOC
gyro/data
2. SURVEY DETAILS
SR319.DOC
gyro/data
SURVEY DETAILS
JOB NUMBER: AK0196G319
CLIENT:
B.P. EXPLORATION
RIG:
C-PAD
LOCATION:
MILNE POINT FIELD
WELL:
LATITUDE:
MPC-25
7O.491O0O N
LONGITUDE:
SURVEY DATE:
26 JANUARY, 1996
SURVEY TYPE :
MULTISHOT IN 5.5" Drillpipe
DEPTH REFERENCE:
MAX. SURVEY DEPTH:
ROTARY TABLE ELEVATION
46
7878
SURVEY TIED ONTO:
NA
SURVEY INTERVAL:
100' From 100 feet to 800 feet,
50' From 800 feet to 3350 feet,
100' From 3400 feet to 7800 feet,
UTM CO-ORDINATES:
TARGET DIRECTION:
325.00
GRID CORRECTION:
N/A
CALCULATION METHOD:
MINIMUM CURVATURE
SURVEYOR:
TOM STODDARD
SR319.DOC
gyro/data
3. OUTRUN SURVEY LISTING
SR319.DOC
A Gyroda t a D i r e c t i ona i Survey
for
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD, ALASKA
Job Number: AK0196G319
Run Date: 26-Jan-96 11:15:
Surveyor: STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.491000 deg. N
Sub-sea Correction from Vertical Reference: 46 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 325.000 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyr oda t a D i r e c t i ona l. Survey
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD,
Job Number: AK0196G319
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
0.0 0.00 0.00 0.0 0.0 -46.0 0.00 0.0 0.0
0-7800 FT. GYRO SURVEY RUN INSIDE DRILLPIPE
MEASURED DEPTHS ARE REFERENCED TO AN RKB OF 46' ABOVE SEA LEVEL
Page 1
HORIZONTAL
COORDINATES
feet
0.00 N 0.0~
100.0 .10 318.33 100.0 .1 54.0 .10 .1 318.3
200.0 .03 70.61 200.0 .2 154.0 .11 .2 327.3
300.0 .18 1.45 300.0 .3 254.0 .17 .3 349.3
400.0 1.01 356.02 400.0 1'.2 354.0 .83 1.3 355.1
500.0 2.08 5.07 500.0 3.3 454.0 1.10 4.0 359.8
600.0 2.50 3.33 599.9 6.4 553.9 .42 8.0 2.0
700.0 4.00 350.28 699.7 11.3 653.7 1.66 13.6 359.2
800.0 5.35 343.29 799.4 18.9 753.4 1.47 21.6 354.4
850,0 5.75 345.41 849.1 23.4 803.1 .89 26.4 352.6
900.0 6.04 345.94 898.9 28.2 852.9 .60 31.5 351.4
950.0 6.48 347.32 948.6 33.3 902.6 .92 37.0 350.7
1000.0 7.57 344.53 998.2 39.0 952.2 2.29 43.0 350.0
1050.0 8.50 343.62 1047.7 45.6 1001.7 1.87 50.0 349.2
1100.0 10.00 342.79 1097.1 53.2 1051.1 3.02 58.0 348.4
1150.0 10.93 342.59 1146.2 61.9 1100.2 1.86 67.0 347.6
1200.0 12.44 345.71 1195.2 71.4 1149.2 3.28 77.1 347.2
1250.0 13.10 341.65 1244.0 81.9 1198.0 2.22 88.2 346.7
1300.0 13.86 343.59 1292.6 93.0 1246.6 1.77 99.8 346.2
1350.0 14.85 343.82 1341.0 104.8 1295.0 2.00 112.2 346.0
1400.0 .16.23 344.00 1389.2 117.4 1343.2 2.75 125.6 345.7
.06 N
.13 N
.30 N
1.33 N
4.02 N
8.01 N
13.63 N
21.53 N
26.19 N
31.16 N
36.47 N
42.40 N
49.11 N
56.80 N
65.47 N
75.21 N
85.81 N
96.93 N
108.83 N
121.70 N
.06 W
.09 W
.06 W
.11 W
.01 W
.27 E
.19 W
2.12 W
3.42 W
4.69
5.95 W
7.44 W
9.36 W
11.69 W
14.39 W
17.14 W
20.25 W
23.73 W
27.21 W
30.92 W
A Gyrodata
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD,
Job Number: AK0196G319
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
1450.0 17.48 343.63 1437.0
1500.0 18.69 344.32 1484.6
1550.0 19.79 343.05 1531.8
1600.0 20.79 342.68 1578.7
1650.0 20.69 344.02 1625.4
1700.0 20.47 344.12 1672.2
1750.0 21.89 345.31 1718.9
1800.0 23.26 345.39 1765.0
1850.0 24.77 346.88 1810.7
1900.0 26.35 347.52 1855.8
1950.0 27.85 348.35 1900.3
2000.0 28.86 349.86 1944.3
2050.0 30.35 348.33 1987.8
2100.0 31.03 348.75 2030.8
2150.0 32.67 348.97 2073.3
2200.0 33.04 348.81 2115.3
2250.0 34.80 348.75 2156.8
2300.0 35.42 349.98 2197.7
2350.0 37.34 348.05 2237.9
2400.0 38.17 347.90 2277.4
2450.0 40.18 348.41 2316.2
2500.0 41.30 347.67 2354.1
2550.0 43.19 347.83 2391.1
2600.0 44.14 346.83 2427.3
2650.0 45.62 345.82 2462.7
131.2
145.8
161.4
177.9
194.7
211.4
228.4
246.4
265.3
285.3
306.3
327.9
350.5
373.9
398.0
422.8
448.3
474.5
501.6
529.8
558.9
588.9
619.9
651.8
684.7
Dire
SUBSEA
DEPTH
feet
c t i o n a 1 Survey
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
Page
1391.0 2.53 140.1 345.5
1438.6 2.45 155.6 345.4
1485.8 2.36 172.0 345.2
1532.7 2.00 189.4 345.0
1579.4 .97 207.1 344.9
HORIZONTAL
COORDINATES
feet
135 62 N 34 9 ~
. . ~
150.54 N 39.24 W
166.36 N 43.88 W
182.92 N 48.99 W
199.88 N 54.06 W
1626.2 .45 224.6 344.8 216.78 N 58.88 W
1672.9 2.96 242.7 344.8 234.21 N 63.64 W
1719.0 2.74 261.9 344.8 252.78 N 68.49 W
1764.7 3.25 282.2 344.9 272.54 N 73'.36 W
1809.8 3.22 303.8 345.1 293.57 N 78.14 W
1854.3
1898.3
1941.8
1984.8
2027.3
3.10 326.5 345.3
2.46 350.2 345.6
3 . 34 374 . 9 345.8
1.43 400.4 346.0
3.30 426.7 346.1
2069.3 .75 453.8 346.3
2110.8 3.52 481.7 346.4
2151.7 1.89 510.4 346.6
2191.9 4.47 540.1 346.7
2231.4 1.67 570.7 346.8
2270.2 4.08 602.2 346.9
2308.1 2.44 634.9 346.9
2345.1 3.78 668.5 347.0
2381.3 2.34 703.0 347.0
2416.7 3.30 738.3 347.0
315.85 N 82.89 W
339.17 N 87.38 W
363.42 N 92.06 W
388.43 N 97.12 W
414.31 N 102.22
440.93 N
468.30 N
496.56 N
525.67 N
555.61 N
586.52 N
618.45 N
651.30 N
684.98 N
719.26 N
107.44 W
112.87 W
118.18 W
123.83 W
130.21 W ~
136.69 W
143.46 W
150.59 W
158.16 W
166.51 W
A Gyrodata
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD,
Job Number: AK0196G319
ALASKA
MEASURED I
DEPTH
feet
N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
2700.0 r46.15 345.55 2497.5
2750.0 47.29 344.22 2531.8
2800.0 48.75 343.59 2565.2
2850.0 50.15 344.05 2597.7
2900.0 51.88 342.70 2629.2
2950
3000
3050
3100
3150
3200
3250
3300
3350
3400
35O0
3600
3700
3800
3900
4000
4100
4200
4300
4400
.0 52.97 341.90 2659.7
.0 55.03 343.51 2689.1
.0 55.95 342.59 2717.4
.0 57.88 343.52 2744.7
.0 58.63 343.51 2771.0
.0 61.01 344.74 2796.1
.0 62.22 340.15 2819.9
.0 64.45 343.79 2842.4
.0 65.44 343.92 2863.5
.0 67.85 345.33 2883.4
.0 71.67 343.12 2917.9
.0 71.66 343.31 2949.4
.0 69.93 341.72 2982.3
.0 67.19 341.97 3018.8
.0 67.98 344.15 3057.0
· 0 70.86 340.88 3092.1
.0 69.40 342.71 3126.1
.0 67.33 342.99 3163.0
.0 68.55 343.10 3200.6
.0 66.78 344.85 3238.6
718.3
752.5
787.7
823.6
860.5
898.3
936.9
976.0
1015.9
1056.2
1097.0
1139.0
1181.7
1224.5
1267.8
1356.3
1446.5
1536.6
1625.6
1713.5
1802.8
1892.8
1981.3
2069.4
2156.9
Directional Survey
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
2451.5 1.12 774.2 346.9
2485.8 2.98 810.5 346.8
2519.2 3.07 847.7 346.7
2551.7 2.88 885.6 346.6
2583.2 4.05 924.4 346.4
2613.7 2.52 963.9 346.3
2643.1 4.87 1004.3 346.1
2671.4 2.39 1045.4 346.0
2698.7 4.17 1087.3 345.9
2725.0 1.50 1129.8 345.8
2750.1 5.21 1173.0 345.7
2773.9 8.43 1216.9 345.6
2796.4 7.89 1261.5 345.5
2817.5 1.99 1306.7 345.4
2837.4 5.47 1352.6 345.4
2871.9 4.35 1446.4 345.3
2903.4 .18 1541.3 345.2
2936.3 2.29 1635.6 345.0
2972.8 2.75 1728.5 344.9
3011.0 2.16 1820.9 344.8
3046.1 4.20 1914.4 344.7
3080.1 2.25 2008.4 344.5
3117.0 2.08 2101.3 344.5
3154.6 1.22 2193.9 344.4
3192.6 2.40 2286.4 344.4
Page 3
HORIZONTAL
COORDINATES
feet
754.04 N 175.3~
789.18 N 184.88
824.89 N 195.18
861.37 N 205.7'7
898.61 N 216.89
936.36 N
974.97 N
1014.38 N
1054.45 N
1095.22 N
1136.80 N
1178.72 N
1221.20 N
1264.70 N
1308.96 N
1399.22 N
1490.10 N
1580.17 N
1668.61 N
1757.04 N
1846.30 N
1935.63 N
2024.44 N
2113.10 N
2201.99 N
228.94 W
240.96 W
252.98 W
265.18 W
277.24 W
289.06 W
302.33 W
316.15 W
328.74 W
340.90 w
366.41 W
393.82 W
422.18 W
451.18 W
478.11 W
506.25 W
535.63 W
563.04 W
590.07 W
615.61 W
A Gyrodata
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD,
Job Number: AK0196G319
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
4500.0 68.91 344.57 3276.3
4600.0 70.00 346.37 3311.4
4700.0 69.42 344.41 3346.1
4800.0 70.57 346.05 3380.3
4900.0 70.79 344.92 3413.4
5000.0 70.21 344.19 3446.7
5100.0 70.47 343.54 3480.4
5200.0 70.57 343.62 3513.7
5300.0 69.55 344.06 3547.8
5400.0 70.32 343.52 3582.1
5500.0 69.86 342.30 3616.2
5600.0 71.24 342.41 3649.5
5700.0 70.44 343.24 3682.3
5800.0 69.97 343.21 3716.2
5900.0 70.13 344.44 3750.3
6000.0 69.47 344.49 3784.8
6100.0 69.79 346.80 3819.6
6200.0 69.05 346.59 3854.8
6300.0 69.43 346.48 3890.2
6400.0 68.87 347.12 3925.8
6500.0 68.65 348.69 3962.0
6600.0 69.07 348.94 3998.1
6700.0 69.43 349.69 4033.5
6800.0 69.55 349.51 4068.6
6900.0 69.69 350.54 4103.4
2244.0
2331.8
2419.7
2507.8
2596.2
2685.1
2774.2
2863.5
2952.5
3041.4
3130.9
3220.9
3310.8
3400.2
3489.2
3577.6
3665.4
3752.3
3839.3
3926.1
4011.9
4097.3
4182.5
4267.6
4352.6
Dire
sUBSEA
DEPTH
feet
3230.3
3265.4
3300.1
3334.3
3367.4
3400.7
3434.4
3467.7
3501.8
3536.1
3570.2
3603.5
3636.3
3670.2
3704.3
3738.8
3773.6
3808.8
3844.2
3879.8
3916.0
3952.1
3987.5
4022.6
4057.4
c t i on a 1 Survey
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
2.15 2379.0 344.4
2.00 2472.6 344.4
1.92 2566.4 344.5
1.92 2660.4 344.5
1.09 2754.7 344.5
.90 2849.0 344.5
.66 2943.2 344.5
· 13 3037.4 344.5
1.10 3131.4 344.5
.92 3225.3 344.4
1.23 3319'.3 344.4
1.38 3413.6 344.3
1.12 3508.0 344.3
.47 3602.1 344.3
1.17 3696.1 344.3
.66 3789.9 344.3
2.19 3883.6 344.3
.77 3977.2 344.4
.40 4070.6 344.4
· 82 4164.0 344.5
1.48 4257.0 344.5
· 48 4350.0 344.6
.79 4443.2 344.7
.20 4536.6 344.8
.97 4629.9 344.9
Page 4
HORIZONTAL
COORDINATES
feet
2291.32 N 640.0~ ]
2381.96 N 663.51 v~
2472.72 N 687.16 W
2563.57 N 711.11 W
2654.93 N 734.75 W
2745.79 N 759.85 W
2836.25 N 786.02 W
2926.69 N 812.67 W
3016.98 N 838.83 W
3107.17 N 865.06 W
3197.04 N 892.69 W
3286.90 N 921.27 W
3377.14 N 949.16 W
3467.23 N 976.32 W
3557.51 N 1002.50 W
3647.93 N
3738.75 N
3829.85 N
3920.79 N
4011.77 N
4102.91 N
4194.40 N
4286.29 N
4378.42N
4470.74 N
1027.63 W
1050.87 W
1072.41 W
1094.17 W
1115.52 W
1135.05 W
1153.15 W
1170.49 W
1187.39 W
1203.63 W
A Gyrodata Di
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD,
Job Number: AK0196G319
ALASKA
r e c t i o n a 1
Survey
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
7000.0 68.69 350.97 4138.9
7100.0 68.53 351.57 4175.4
7200.0 69.17 352.87 4211.5
7300.0 70.23 353.38 4246.2
7400.0 69.87 353.15 4280.3
4436.8 4092.9 1.08 4722.9 345.0
4520.3 4129.4 .58 4815.5 345.2
4603.2 4165.5 1.37 4908.1 345.3
4685.9 4200.2 1.17 5001.0 345.4
4768.7 4234.3 .42 5094.1 345.6
7500.0 70.59 352.77 4314.1
7600.0 70.20 353.29 4347.6
7700.0 69.32 352.99 4382.2
7800.0 69.28 352.68 4417.6
7878.0 71.21 352.96 4443.9
4851.8 4268.1 .81 5187.5 345.7
4935.0 4301.6 .63 5280.9 345.9
5017.7 4336.2 .92 5374.0 346.0
5100.4 4371.6 .29 5466.9 346.1
5165.4 4397.9 2.50 5539.8 346.2
Page 5
HORIZONTAL
COORDINATES
feet
4563'.00 N 1218.66
4655.03 N 1232.79
4747.44 N 1245.41 W
4840.55 N 1256.63 W
4933.90 N 1267.66 W
5027.29 N
5120.80 N
5213.96 N
5306.77 N
5379.60 N
1279.20 W
1290.63 W
1301.84 W
1313.50 W
1322.67 W
Final Station Closure: Distance: 5539.82 ft Az: 346.19 deg.
A Gyr odat a D i re c t i on a i Survey
for
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD, ALASKA
Job Number: AK0196G319SS
Run.Date: 26-Jan-96
Surveyor: STODDARD
11:15:
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.491000 deg. N
Sub-sea Correction from Vertical Reference: 46 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 325.000 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyrodata
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD,
Job Number: AK0196G319SS
ALASKA
Directional
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH
feet deg. deg. feet feet deg./ feet deg.
100 ft.
-46.0 0.00 0.00 0.0 0.0 0.00 0.0 0.0
0-7800 FT. GYRO SURVEY RUN INSIDE DRILLPIPE
MEASURED DEPTHS ARE REFERENCED TO AN RKB OF 46'
ABOVE SEA LEVEL
Survey
Page
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
100.0 .07 204.38 146.0 .1
200.0 .10 38.79 246.0 .2
300.0 .56 358.95 346.0 .7
400.0 1.50 .18 446.0 2.1
500.0 2.28 4.27 546.0 4.7
600.0 3.19 357.30 646.0 8.7
700.0 4.63 347.04 746.0 14.8
800.0 5.72 345.28 846.0 23..1
900.0 6.45 347.25 946.0 33.0
1000.0 8.46 343.65 1046.0 45.4
1100.0 10.92 342.59 1146.0 61.8
1200.0 13.13 341.73 1246.0 82.4
1300.0 15.00 343.84 1346.0 106.1
1400.0 17.71 343.76 1446.0 133.9
1500.0 20.09 342.94 1546.0 166.4
1600.0 20.59 344.06 1646.0 202.0
1700.0 22.69 345.36 1746.0 238.9
1800.0 26.01 347.38 1846.0 281.0
1900.0 28.92 349.80 1946.0 328.8
2000.0 31.62 348.83 2046.0 382.5
.10 .2 322.4
.14 .3 337.4
.47 1.3 352.0
.95 4.0 357.3
.79 8.0 .8
.99 13.6 .7
1.57 21.6 357.0
.93 26.4 352.7
.90 37.0 350.8
1.88 50.0 349.2
1.87 67.0 347.6
2.20 99.8 346.7
2.07 125.6 345.9
2.51 155.6 345.5
2.25 189.4 345.2
.74 224.6 344.8
2.83 261.9 344.8
3.22 303.8 345.1
2.50 374.9 345.6
2.10 426.7 346.0
.10 N .07 W
.21 N .07 W
.78 N .08 W
2.57 N .07 W
5.86 N .13 E
10.61 N .23 W
17.30 N 1.08 W
25.89 N 3.34 W
36.19 N 5.88 W
48.88 N 9.30 W
65.43 N 14.38 W
86.28 N 20.40 W
110.16 N 27.59 W
138.44 N 35.77 W
171.38 N 45.43 W
207.31 N 56.18 W
245.12 N 66.49 W
289.00 N 77.10 W
340.11 N 87.56 W
397.70 N 98.95 W
A G y r o d a t a D i
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD,
Job Number: AK0196G319SS
ALASKA
r e c t
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG
DEPTH DEPTH SECTION SEVERITY
feet deg. deg. feet feet deg./
100 ft.
2100.0 34.34 348.77 2146.0
2200.0 37.51 348.02 2246.0
2300.0 41.07 347.83 2346.0
2400.0 44.92 346.29 2446.0
2500.0 47.91 343.95 2546.0
2600.0 52.48 342.25 2646.0
2700.0 57.92 343.52 2746.0
2800.0 64.62 343.82 2846.0
2900.0 71.66 343.29 2946.0
3000.0 67.75 343.52 3046.0
3100.0 68.28 342.86 3146.0
3200.0 67.20 344.80 3246.0
3300.0 69.42 344.41 3346.0
3400.0 70.23 344.21 3446.0
3500.0 69.61 344.04 3546.0
3600.0 71.10 342.40 3646.0
3700.0 70.11 344.29 3746.0
3800.0 69.23 346.65 3846.0
3900.0 68.75 347.99 3946.0
4000.0 69.47 349.63 4046.0
441.7
507.4
582.5
669.2
767.5
881.4
1017.9
1189.1
1436.8
1688.2
1940.5
2174.1
2419.5
2683 .1
2947.8
3211.5
3478.0
3730.7
3974.0
4212.8
4453.0
4685.6
4930.9
5165.4
4100.0 68.66 351.09 4146.0
4200.0 70.22 353.38 4246.0
4300.0 70.22 353.27 4346.0
4397.9 71.21 352.96 4443.9
2.80
3 .89
2.79
2 .85
3.02
3 .21
4.03
6.87
.63
2.33
2.16
2.35
1.92
.90
1.05
1.37
1.08
1.12
1.19
.58
.98
1.17
.64
2.50
o n a 1
Survey
Page
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
C O O R D I N A T E S
feet
481.7 346.4
570.7 346.8
634.9 346.9
738.3 347.0
847.7 346.8
963.9 346.3
1129.8 345.9
1306.7 345.5
1541.3 345.2
1820.9 344.8
2101.3 344.5
2379.0 344.4
2566.4 344.5
2849.0 344.5
3131.4 344.5
3413.6 344.3
3696.1 344.3
3977.2 344.3
4257.0 344.5
4536.6 344.8
4815.5 345.1
5001.0 345.4
5280.9 345.8
5539.8 346.2
461.21 N
531.80 N
611.64 N
703.11 N
804.38 N
919.43 N
1056.49 N
1228.69 N
1480.28 N
1731.58 N
1983.49 N
2219.62 N
2472.58 N
2743.81 N
3012.17 N
3277.53 N
3546.21 N
3807.15 N
4062.60 N
4319.12 N
4580.92 N
4840.14 N
5116.23 N
5379.60 N
111.47 ~
125.14 W
142.01 W
162.58 W
189.26 W
223.54 W
265.78 W
318.31 W
390.86 W
470.36 W
550.40 W
620.43 W
687.13 W
759.31 W
837.44 W
918.29 W
999.22 W
1067.04 W
1126.41 W
1176.51 W
1221.41 W
1256.59 W
1290.07 W
1322.67 W
Final Station Closure: Distance: 5539.82 ft Az: 346.19 deg.
gyro/data
4. QUALITY CONTROL
SR319.DOC
Quality Control Comparisons
B.P. EXPLORATION
WELL: MPC-25, 9.625
Location: C PAD, MILNE POINT FIELD, ALASKA
Job Number : AK0196G319 / AK0196G319
/ Comparison
Depth Inc Ink Delta Az Az Delta
1000.0 7.42 7.57 -.146 343.45 344.53 -1.079
2000.0 28.73 28.86 -.124 348.97 349.86 -.885
For Inclinations Greater than 10 degrees:
Average Inclination Difference = -.1236 deg.
Average Azimuth Difference = -.8847 deg.
gyro/data
QUALITY CONTROL REPORT
JOB NUMBER: AK0196G319
TOOL NUMBER: 080
MAXIMUM GYRO TEMPERATURE:
MAXIMUM AMBIENT TEMPERATURE:
77.10C
41.7C
MAXIMUM INCLINATION:
AVERAGE AZIMUTH:
71.26
346.19
WIRELINE REZERO VALUE:
REZERO ERROR / K:
CALIBRATION USED FOR FIELD SURVEY:
1248
CALIBRATION USED FOR FINAL SURVEY:
1248
PRE JOB MASS BALANCE OFFSET CHECK:
.38
POST JOB MASS BALANCE OFFSET CHECK~ ·
CONDITION OF SHOCK WATCHES
-.42
USED -.40
UPON ARRIVAL AT RIG:
OK
UPON COMPLETION OF SURVEY:
OK
UPON RETURN TO ATLAS
OK
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING EASTING
FIELD SURVEY 7878 71.21 352.96 4443.9 5379.6N 1322.7W
FINAL SURVEY 7878 71.21 352,96 4443.9 5379.6N 1322.7W
SR319.DOC
gyro/data
SR319.DOC
gyro/data
FUNCTION TEST
JOB NUMBER: AK0196G319
5 Survey stations were collected at the measured depth shown below. The tables show the repeatability
of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ff 1 2 3 4 5
2700 46.15 46.15 46.15 46.15 46.15
AZIMUTH
M.D. ft 1 2 3 4 5
2700 345.31 345.37 345.42 345.44 345.55
SR319.DOC
gyro/data
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR319.DOC
gyro/data
EQUIPMENT REPORT
JOB NUMBER: AK0196G319
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. 080
GYRO SECTION A0099
DATA SECTION C0031
POWER SECTION C0006
COMPUTER
POWER SUPPLY
.PRINTER
INTERFACE
A0213
A0085
A0029
A0035
BACKUP
TOOL No. 713
GYRO SECTION A0088
DATA SECTION C0023
POWER SECTION C0022
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
A0215
A0055
A0079
A0071
WIRELINE COMPANY:
ATLAS WIRELINE
CABLE SIZE:
5/16"
RUNNING GEAR
2 1/2" SYSTEM
TOTAL LENGTH OF TOOL:
17.5 feet
MAXIMUM O.D.:
2.5 INCHES
TOTAL WEIGHT OF TOOL'
240Lbs
SR319.DOC
0 I:t I !__1--11M G S E I=IL/I 1-- E S
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Howard Okland
3001 Porcupine Dr.
Anchorage, Alaska 99501
August 28, 1996
RE: MWD Formation Evaluation Logs - MPC-25, AK-MM-960101
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Yah Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
2" x 5" MD Resistivity and Gamma Ray Logs:
2"x 5" TVD Resistivity and Gamma Ray Logs:
2"x 5" MD Neutron and Density Logs:
2"x 5" TVD Neutron and Density Logs:
1 Blueline ~
1 Rev. Folded Sepia
1 Blueline ~
1 Rev. Folded Sepia
1 Blueline
1 Rev. Folded Sepia
1 Blueline ~
1 Rev. Folded Sepia
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
sper, n -sun
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
3001 Porcupine Drive
Anchorage, Alaska 99501
September 03, 1996
RE: MWD Formation Evaluation Logs - MPC-25, AK-MM-960101
The technical data listed below is being submitted herewith. Please acknowledge receipt by retuming a
signed copy of this transmittal letter to the attention of.'
Jan Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
MPC-25:
1 LDWG formatted LIS tape with verification listing.
API~: 50-029-22638-00
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (9.07) 563-3256 · Fax (907) 563-7252
A [Dresser Industries, Inc. Company
STATE OF ALASKA
AL/-~SKA OIL AND GAS CONSERVATION COMMISb.
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon × Suspend __ Operation Shutdown __ Re-enter suspended well
Alter casing __ Repair well __ Plugging X Time extension __ Stimulate __
Change approved program Pull tubing __ Variance __ Pedorate __ Other__
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development x
Exploratory __
Stratigraphic
Service
4. Location of well at surface
1143' NSL, 2436' WEL, SEC. 10, T13N, RIOE
At top of productive interval
2783' NSL, 4222' WEL, SEC. 3, T13N, RIOE
At effective depth
At total depth
2733' NSL, 4264' WEL, SEC. 3, T13N, RIOE
6. Datum elevation (DF or KB)
Plan RTE = 46'
7. Unit or Property name
MIIne Point Unit
8. Well number
MPC-25
9. Permit number
96-001
10. APl number
50- 029-22638
11. Field/Pool
Milne Point/Kuparuk River
feet
12. Present well condition summary
Total depth: measured
~ - true vertical
Effective depth: measured
true vertical
Casing Length
Structural
Conductor 80'
Surface 8564'
Intermediate
Production
Liner
Perforation depth: measured
Plugs (measured)
15283 feet
7722 feet
feet Junk (measured)
feet
Size Cemented Measured depth True vertical depth
20" 250 sx Arcticset / (Approx.) 112' 112'
9-5/8" ~¢o~,pF'e.¢5o,~: ~o~,~'~' 8595' 4675'
true vertical
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
13. Attachments
Description summary of proposal × Detailed operations program __
BOP sketch
14. Estimated date for commencing operation
01/26/96
16. If proposal was verbally approved
Name of approver ¢'f,~u,-¢- c~,~,,~.&~e_ff
Date approved
15. Status of well classification as:
Oil X Gas__ Suspended __
Service
17. I hereby ~t the for~egoing, is true an~i ~.orrect to the best of my knowledge.
Signed '"-//~'1 "---~q~C, .~,~ Title SeniorDrilling Engineer Date
/./ FOR CO~SS~ON USE ONLY
Conditions of approval: Notify Commit'sion so representative may witness
,.,66 Oog'J Approval No.gG_ O/7
Plug integrity f BOP Test / Location clearance 9~oe~ ¢ ~' - ·
Mechanical Integrity Test Subsequent form required 10--- ~o ~9
Approved by order of the Commission David W. Johnston ' -~"--"~Commissioner Date f ~'~;~
Form 10-403 Rev 06/15/88
~-.,;:~'~ , .~ ~ ~ ~: ~-~/~i~i~-~i~ !"~i~i'-~: ~:~:~i ::~' ~.~ ..,:~.~,~ ~.~- ~. -~.
SUBMIT IN TRIPLICATE
1. POOH after TD Milne Pt. Well# MP C-25.
.
o
,
5,
.
.
,
.
10.
11.
12.
13.
14.
PU muleshoe and 1500' of 3-1/2" drillpipe. RIH on 5" drillpipe to TD at 15,283' md
(ESTIMATED TOP KUPARUK 'C' SAND 14,744' MD). Circulate and condition hole for cement
plug. Spot 76 bbl balanced cement plug. Slowly pull out of cement plug. At 15 stands above the
plug rig up and circulate slowly down the drillpipe 1 drillpipe volume. MONITOR RETURNS. IF
LOSING FLUID SHUTDOWN. ~--
,
·
NOTE: Volume based on 8-1/2" hole from TD to 300' above KUPARUK 'C' SAND
PREMIUM G + 0.20% HALAD 344 + 0.20% CFR3 + HR5 AS
.NECESSARY
WT: 15,8 PPG YIELD: 1,15 FT3lSK
Continue POOH to 9,212' md. Spot. 30 bbl high visc mud pill (weight of pill at current mud
weight). Continue POOH to 8,895' md. Spot 47 bbl balanced cement plug. Slowly pull out of
plug. At 15 stands above the plug rig up and circulate slowly down the drillpipe I drillpipe
volume. MONITOR RETURNS. IF LOSING FLUID SHUTDOWN. POOH LD muleshoe.
NOTE: 9-5/8" shoe is at 8,595' md. Volume based on 300' of 8-1/2" open hole +50%
+ 200 ft inside 9-5/8", 40# casing.
.
PREMIUM G + 1% CACL2
WT.' 16PPG YIELD' 1.05 FT3/SK
Test BOPE.
RU Atlas Wireline/Gyro Data. RU GYRO TOOL. WLIH to 8,100' md. Run GYRO inside casing
from 8,100' md to surface. RD Atlas Wireline/Gyro Data.
MU bit on a motor, with Directional MWD and LWD CDR/CDN (GR/RES/Dens/Neu). RIH to
8,200' md. Begin wash and ream until tag cement. Drill cement to 8,615' md.
NOTE: Indicate on morning report "TAG WEIGHT".
Circulate and condition mud at 8,615' md before begin sidetrack.
Drill 8.5" hole to TD as per directional plan. Run and Cement 7" Casing. Displace cement with
seawater and enough diesel to cover from the base of permafrost to surface.
Test casing to 3500 psig.
ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well.
Perforate and Stimulate in absence of rig. Displace well with 10.2 ppg brine and set a wire!ine
retrievable bridge plug.
MIRU Nabors 4ES or Polar 1 Rig. NU & Test BOPE to 5000 psig.
Complete well with 3-1/2" tubing and packer hookup.
Install Surface Lines and Wellhouse and put the well on production.
MEMORANDU /I
State Alaska
Alaska Oil and Gas Conservation Commission
TO:
David Job~ DATE:
Chairman
January 14, 1996
THRU: Blair Wondzeil, ~L~.~. FILE NO:
P. !. Supervisor ;/'': ~ :~ ~-
FROM: Bobby Foster, ~"./' SUBJECT:
Petroleum lnsp6ctor
EWOIANDD.doc
Diverter Inspection
BPX- MPU - C-25
PTD # 96-0001
Kuparuk River Field
Sunday, January 14, 1996: ! traveled this date to BPX's MPU C-25 being drilled by
Nabors rig 22E and inspected the diverter for instalation and also witnessed the
function test.
As the attached AOGCC Diverter Systems Inspection Report shows the system was
installed correctly and all items functioned properly.
! spoke with Jimmy Pyron, BPX rig rep. and Laverne Linder, Nabors Drilling rep.,
concerning changeing the size of the diverter line from 10' bifurcated lines to a
single 16' line. ! told them that this was acceptable to AOGCC and, in my opinion, a
much better system.
The location was tight, but there was access to all areas of the rig. The rig was fairly
clean and all equipment seemed to be in good working order.
Summary: I inspected and witnessed the function test of the diverter system on
Nabors rig 22E drilling BPX's MPU C-25.
Attachment: EWOIANDD.XLS
"-- STATE OF ALASKA
ALASKA OIL .~ND GAS CONSERVATION COMIv,.SSlON
Diverter Systems Inspection Report
Date: 1/9/95
Operation: Development X Exploratory:
Ddg Contractor: Nabors Rig No. 22E PTD # 96-0001 Rig Ph. # 659-4446
Operator: BPX Oper. Rep.: JIMMY PYRON
Well Name: MPC-25 Rig Rep.: LAVERNE LINDER
Location: Sec. 10 T. 13N R. 10E Merdian UM
VliSC. INSPECTIONS:
Location Gen.: OK Well Sign: OK
Housekeeping: OK (Gen.) Drlg. Rig: OK
Reserve Pit: N/A Flare Pit: NtA
31VERTER SYSTEM INSPECTION:
Diverter Size: 20"
Divert Valve(s) Full Opening: 3
Valve(s) Auto & Simultaneous: 1
!Vent Line(s) Size: 10"
Vent Line(s) Length: 60'
Line(s) Bifurcated: 1
Line(s) Down Wind: 1
Line(s) Anchored: YES
Tums Targeted / Long Radius: N/A
in.
in.
ACCUMULATOR SYSTEM:
Systems Pressure:
Pressure After Closure:
200 psi Attained After Closure:
Systems Pressure Attained:
Nitrogen Bottles:
2800 psig
1600 psig
min. 36 sec.
2 min. 58 sec.
'8 (~'2100 Avg.
psig
MUD SYSTEM INSPECTION: Light Alarm
Trip Tank: NO NO
Mud Pits: YES YES
Flow Monitor: 'YEs YES
GAS DETECTORS: Light Alarm
Methane YES YES
Hydrogen Sulfide: YES YES
Pits
Motors
~ Pipe
tShed
center of well to end of line - 60'
brifricatio line- 15' _ ~'
Prevailing Winds
Non Compliance Items 0 Repair Items Withil
N/A
Day (s) And contact the Inspector @ 659-3607
Remarks:
Distribution
orig. - Well File
c - OperlRep
c - Database
c- Tdp Rpt File
c - Inspector
AOGCC REP.:
OPERATOR REP.:
EWOIANDD.XLS
BOBBY D. FOSTER
JIMMY P YR ON
DVTRINSP.XLT (REV. 1/94)
TONY KNOWLE$, GOVERNOR
ALASKA OILAND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Janua~ 5.1996
Tim Schofield
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
P O Box 196612
Anchorage, AK 99519-6612
- Re: · Miine Point Unit MPC-25 ......
BP Exploration (Alaska), Inc.
Permit No g6-001
Surf Loc. 1143'NSL, 2436'WEL, Sec. 10, T13N, R10E, UM
Btmhole Loc 2422'NSL, 4561'WEL, Sec. 34, T14N, R10E,UM
Dear Mr. Schofietd'
Enclosed is the a~proved application for permit to ddil the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient
notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing
shoe must be given so that a representative of the Commission may witness the test. Notice may be
inspector on the North Slope pager at 659-3607.
David W. Johnston '~ " '
BY ORDER OF THE COMMISSION
/encl
c: Dept of Fish & Game, Habitat Section - w/o encl
Dept of Environmental Conservation - w/o end
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.OO5
la. Type of work Drill [] Redrilll-1 lb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil []
Re-Entry [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RTE = 46 f e et Milne Point / Kuparuk River
3. Address 6. Property Designation
P. 0. Box 196612, Anchorage, Alaska 99519-6612 ADL 355017
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
1143' NSL, 2436' WEL, SEC. 10. T13N, RIOE Milne Point Unit
At top of productive interval 8. Well number Number
2149' NSL, 4511' WEL, SEC. 34, T14N, RIOE MPC-25 2S100302630-277
At total depth 9. Approximate spud date Amount
2422' NSL, 4561' WEL, SEC. 34, T14N, RIOE 01/06/96 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD)
property line
ADL 047434 2422 feet No Close Approach feet 4480 15223' MD / 7678' TVD feet
16. To be completed for deviated wells ;17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 300 feet Maximum hole angle69.5 o Maximum surface 3301 psig At total depth (TVD) 7000'/3998 psig
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
24" 20" 91.1# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.)
12-1/4" 9-5/8" 40# L-80 Btrc 8589' 31' 31' 8620' 4694' 1653 sx PF 'E', 250 sx 'G', 150 sx PF 'E'
8-1/2" 7" 26# L-80 Btrc 7512' 30' 30' 15223' 7678' 240 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor
Surface ~-¢~~I V ~D
Intermediate
Production J,~N 0 ~-
Liner
Perforation depth' measured AJaska Oil & Gas CMs. Commissio~
true vertical Allc~fage
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirementsl-I
21. I hereby ce~t thc. jarSigned 7~ egpi n~.¢~' ~s ~? and correct to the best of my knowledge
--,--~C'.-~ .~v'C&c Title SeniorDrillin~l En~lineer Date
· ./~ Commission Use Only
Permit Number APl r~umberI //..~'/~ ,Approval/date' ~ See cover letter
':=~'-<::::;:~// 50- c:s~_.. ~-- ~----_.~---~,..~,~- for other requirements
Conditions of approval Samples required [] Yes ~ No M I
ud og required []Yes ~ No
Hydrogen sulfide measures [] Yes 1~ No Directional survey required .,~ Yes [] No
Required working pressure for BOPE 1-12M; r-13M; J~t5M; []10M; []15M;
Other: Uriglnai Signed By by order of e/
Approved by David W. Johnston Commissioner me commission Dat
Form 10-401 Rev. 12-1-85 Submit 1 plicate
Tar~let Location: 2149 NSL 4511 WEL Sec 34 T14N R10E UM., AK
Bottom Hole 2422 NSL 4561 WEL Sec 34 T14N R10E UM., AK
Location'
[AFE Number: [337006
[Rig: [Nabors 22-E ~/
IEstimated Start 16JAN95 I IOperating days t°Date: complete:
20
IMD' 115'223' I TVD: 17'678'bkb
KBE: [42'
IWell Design (conventional, slimhole,
etc.)'
IMilne Point Ultra Slimhole:9-5/8" SURFACE
CASING X 7" LONGSTRING
Formation Markers-
Formation Tops MD TVD (bkb)
base permafrost 1,890 1,841
NA 7,842 4,422 Top of Schrader Bluff Sands (8.3 ppg)
Seabee Shale 8,47 0 4,6 4 2 Base of Schrader Bluff Sands (8.3 ppg) .
HRZ 1 4,242 6,929 High Resistivity Zone
Top Kuparuk 1 4,5 3 2 7,1 5 0 Kuparuk Cap Rock
Target Sand -Target 1 4,7 91 7,3 4 7 Tar~let Sand (9.6 ppg)
Total Depth 1 5,2 2 3 7,6 7 8
Casinq/Tubin~l Pro!;lram:
Hole (~sg/ Wt/Ft Grade Conn Length Top Btm
Size Tb~l O.D. MD/TVD MD/TVD
24" 20" 91.1# H-40 Weld 80 32/32 112/112
12 1/4" 9-5/8" 40# L-80 btrc 8,589 31/31 8,620/4,694
8 1/2" 7" 26# L-80 btrc 7,512 30/30 15,223/7678
Internal yield pressure of the 7" 26# casing is 7240 psi. Worst case surface pressure would occur
with a full column of gas to the reservoir at 7000 TVDSS. Maximum anticipated surface pressure in
this case assuming a reservoir pressure of 3998 psi is 3301 psi, well below the internal yield
pressure rating of the 7" casing.
Logging Program:
Open Hole Lo~ls:
Surface
MWD Directionaland LWD GR/RES
Intermediate N/A
Final
Cased Hole Logs'
MWD Directional and LWD (GR/CDR/CDN).
Mudloggers are NOT required for this well.
Gas Cons. Commission
L./UII~ILy IVICtlOll I I.,,.lU IU .,,. ~,. I,.. It, J IIIIII , ,, , ,
(PPG) Viscosity Point gel gel Loss
Production Mud Properties: I LSND freshwater mud
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.0 40 10 3 7 8.5 6 - 8
to to to to to to to
10.4 50 15 10 20 9.5 4-6
Well Control'
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will
be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Directional-
i KOP: I o0'
IMaximum Hole An[lie:
Close Approach Well:
69.5°
(No Shut Ins)
Disposal:
Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. The Milne Point reserve pit
can be opened in emergencies by notifying Karen Thomas (564-4305) with request.
Request to AOGCC for Annular Pumping Approval for MP C-25:
1. Approval is requested for Annular Pumping into the MP C-25, 9-5/8" x 7" casing annulus and any
well on the pad/driilsite previously permitted for disposal activities by AOGCC.
2. The base of the Permafrost for all wells located in the Milne Point Unit is _+1,850' TVD. Aquifers in
the Milne Point Unit have been exempted from Class II injection activities by the AOGCC by Aquifer
Exemption Order #2 as referenced in Area Injection Order #10. There are no domestic or
industrial use water wells located within one mile of the project area.
3. The 9-5/8" casing shoe will be set at 8,620' md (4,694' tvd) which is a minimum of 500' tvd
below the Permafrost and into the Seabee/Colville formation which has an established history of
annular pumping at Milne Point.
4. There are _+22 wells on Milne Pt. 'C' Pad. There may be additional unidentified wells within one
quarter mile distance from the subject well. There are no domestic or industrial water use wells
located within one mile of the project area.
5. The wastes to be disposed of during drilling operations can be defined as "DRILLING WASTES".
6. The burst rating (80%) for the 9-5/8" 40# LB0 casing is 4600 psig while the collapse rating
(80%) of the 7" 26# L80 casing is 4325 psig. The break down pressure of the Prince Creek
formation is 13.5 ppg equivalent mud weight. The Maximum Allowable Surface Pressure while
annular pumping regardless of fluid density is 2000 psi as per Shared Services Drilling
"Recommended Cuttings Injection Procedure".
A determination has been made that the pumping operation will not endanger the integrity of the
well being drilled by the submission of data to AOGCC on 7/24/95 which demonstrates the confining
layers, porosity, and permeability of the injection zone.
The cement design for this well ensures that annular pumping into hydrocarbon zones will not
occur.
.
,
JAN 0 2
AJaska L,~t & Gas
Anchorage
Milne Point IJAN96-31 DEC96
I I
Milne Point 1JAN96.31 DEC96
I I I
Milno Point 1JAN08-31 DEC00
DO NOT EXCEED 38,000 BBLS IN ANY ANNULUS.
MAXIMUM EXPECTED FLUID DENSITY 18 17.0 PPG
BURTST PRESSURE 9-5/8" 40# L-80 CASING; 5750 PSI
COLLAPSE 7,, 26#, L-80 CASING: 5410 PSi
9-5/8" SURFACE CASING SHOE DEPTH: 8,620' MD/4,694' TVD
HYDRQ_S_T_ATiC_PRESSURE @ 4.69_4_TVD W.ITH_V_ARIQUS DENSIT_Y_ELUIDS:
(0,052) X (4694) X (FLUID DENSITY) = HYDROSTATIC PRESSURE
80% OF 7" COLLAPSE PRESSURE --- (5410 PSI) X (0.8) -- 4328 PSI
MAXIMUM ALLOWABLE INJECTION PRESSURE 2000 PSI AT ANY PPG
SURFACE CASING SHOE DEPTH (TVD); 4,6 9 4
i i
HYDROSTATIC MAXIMUI~I ALLOWABLE
PRESSURE AT SURFACE 7" COLLAPSE ANNULAR INJECTION
FLUID DENSITY CASING SHOE DEPTH PRESSURE (80%) SURFACE PRESSURE
(PPG) (PSI) , (PS.I) ,
S 1952.70 4328 2000
9 ' 2196.79 ' 4§,28 2000 '
10 2440.88 43'28 ' 1887 '
i
1 1 2684.97 4328 1643
12 ' 2929.06 '4328 1399
,,
1 3 3173.14 4328 1155
.
1 4 3417.23 4328 91 1
1 5 3661.32 4328 667
i i
1 6 ~-905.41 4328 423
1 7 41 49,50 4328 179
ii i fl i
MAX ALLOWABLE INJECTION PRESSURE = 4328 PSI - HYDROSTATIC PRESSURE
or 2000 psi (whichever ia
.
.
.
.
10.
11.
12.
13.
14.
i.,;llll ~ I~ I/ , ,~,LJII.,.,~.~,,,., I1~.,;1,~.~ k4,~.. I.,J~.~l ~lll~,LlVllf,,.J..I I~l~,J. II. I tUlJ i-.ll~..~l,i ~1 .~, _,,,,~l . ~ , ..~; ,
MWD/LWD across Schrader Bluff sands. Run and cement 9-5/8" casing.
ND 20" Diverter, NU and Test 13-5/8" BOPE.
MU a PDC bit on a motor, with Directional MWD and LWD CDR/CDN (GR/RES/Dens/Neu). RIH,
Drill out Float Equipment and 10' of new formation. Perform FIT to 12.5 ppg.
Drill 8.5" hole to TD as per directional plan. Run and Cement 7" Casing. Displace cement with
seawater and enough diesel to cover from the base of permafrost to surface.
Test casing to 3500 psig.
ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well.
Perforate and Stimulate in absence of rig. Displace well with 10.2 ppg brine and set a wireline
retrievable bridge plug.
MIRU Nabors 4ES or Polar 1 Rig. NU & Test BOPE to 5000 psig.
Complete well with 3-1/2" tubing and packer hookup.
Install Surface Lines and Wellhouse and put the well on production.
Drilling Hazards and Risks:
1. The Kuparuk reservoir sands are expected to be a maximum of 3500 psig or
9.6 ppg. The closest injection well is Milne Pt. Well# L-16i which appears
to be isolated by a fault.
2. See the Milne Point C-Pad Data Sheet prepared by Pete Van Dusen for a
general recap of wells drilled by Conoco on C-Pad plus wells recently drilled
by BPX.
3. There will be no close approach wells associated with the drilling of Milne
Pt. Well# C-25.
4. A GYRO or IN-HOLE REFERENCE GYRO MAY be required to be run in this
wellbore.
LOST CIRCULATION:
There were no reports of lost circulation while DRILLINGin the production
intervals. However, Milne Pt. 'C' Pad was developed in the early to mid
1980's with virgin reservoir pressures.
Several wells at Milne Pt. 'C' Pad have experienced partial to full lost
returns while running, circulating and cementing 7" casing.
Have the LCM materials outlined in the Drilling Fluid Program on location
and recommended pills ready to address the Lost Circulation Problem when
drilling into the Kuparuk Sand.
Stuck Pipe Potential:
Stuck pipe has occurred on 2 wells on this pad in the Schrader Bluff Sands.
These wells and the corresponding depths at which they were stuck were: C-
09 @ 4,427' ss with a mudweight of 9.4 ppg. Milne Pt. Well# C-02 @
3,911' ss with 9.2 ppg mudweight.
0 2
JAN
Alaska g, ~, G~s Cons.
Anchorage
WEIGHT: 12.0 ppg
APPROX #SACKS: 1653
YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk
THICKENING TIME: Greater than 4 hrs at 50° F.
TAIL CEMENT TYPE:
ADDITIVES: 2.0% CaCI2
WEIGHT: 15.8 ppg
APPROX #SACKS: 250
FLUID LOSS: 100-150 cc
Premium G
YIELD:1.15 ft3/sx MIX WATER: 5.0 gal/sk
THICKENING TIME: Greater than 4 hrs at 50° F.
FREE WATER: 0
TOP JOB CEMENT TYPE: Permafrost E
ADDITIVES: Retarder
WEIGHT: 12.0 ppg
APPROX NO SACKS: 150
YIELD:2.17 ft3/sx
MIX WATER: 11.63 gal/sk
CENTRALIZER PLACEMENT:
1. I Bowspring centralizer per joint of 9-5/8" casing on bottom 15 joints of casing (15
required).
2. Place all centralizers in middle of joints using stop collars.
OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and
ensure compatibility prior to pumping job. Ensure thickening times are adequate relative
to pumping job requirement. Displace at 12 - 15 bpm. Mix slurry on the fly -- batch
mixing is not necessary.
CEMENT VOLUME:
1. The Tail Slurry volume is calculated to cover 618' md above the 9-5/8" Casing Shoe
with 30% excess.
2. The Lead Slurry volume is calculated to cover from the top of the Tail Slurry to 1500'
md with 30% excess and from 1500' md to surface with 100% excess.
3. 80'md 9-5/8", 40# capacity for float joints.
4. Top Job Cement Volume is 150 sacks. -
CEMENT TYPE: Premium G
ADDITIVES: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344
WEIGHT: 15.8ppg YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk
APPROX # SACKS: 240 THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F
FLUID LOSS: < 50cc/30 min @ 140° F
FREE WATER: 0cc @ 45 degree angle.
CENTRALIZER PLACEMENT:
.
.
7" x 8-1/4" Straight Blade Rigid Centralizers. Two per joint on the bottom 22 joints of 7"
casing (44). This will cover 300' above the KUPARUK C1 Sand.
Run two (2) 7" x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the
9-5/8" casing shoe.
OTHER CONSIDERATIONS:
Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to
pumping job. Ensure thickening times are adequate relative to pumping job requirement.
Displace at 8-10 bpm. Batch mixing is not necessary.
CEMENT VOLUME:
.
Stage 1 cement volume is calculated to cover 1000' md above the Kuparuk Target Sand
with 30% excess.
Dec-21-95 09:48 Anadrill DPC
907 344 2160 P.06
' SHARE'D SERV-TCES
Marker IUentification MD N/S
A) KB 0 0
8) KOP/BUILD 1/i00 300 0
C) BUILD i.5/t00 600 8
O) BUILD 2.0/100 1~00 66
E) BUILD 2,5/100 1600 ~97
F) END 2.5/~00 BUILD 3580 1519
G) 9-5/B' CASING POINI 8620 6183
H) DROP 2/t00 t29~8 I0~42
I) END 2/t00 DROP 1439i 1t3t4
J) TARGET i4791 11567
K) 7" CASING POINT 15223 11840
L) TO 15223 ~lB40
E/W
275
1t20
1838
2050
2096
2145
2145
DRILLING
ii i
i
MPC-25 (P4)
PLAN VIEW
! i i
CLOSURE · 12033 feet at Azimuth 349.73
DECLINATION.' +0.000 (E)
SCALE · ~ inch = 2000 feet
DRAWN '12/21/95
Jnadri ]l Sch]umberger
200 iT TARGE1 RADIUS ,
· .
· :
! ,
I
i ,
0-~ ...... ~ ................................ f ....
:
:
1 ANADRlt,L AK k-6F~'
)- , ,~ P.P ROVED
FOR PE RMI'FTIN~
......... , ....
..~ y~- .' .... . ....
~ ................. p,.AN -~___.._....-~._____:
! ·
:
,, . _ - _.
i"
:
7000 6000 5000 4000 3000 2000 iO00 0 JO00 2000 3000 4000 5000 6000
<- WEST · EAST ->
,SHAREB S.,ERVZCES BRILLIN6 I'
ii lllllll t II I II
Anadr j ] ] Schlumberger
MPC-25 (P4)
VERTICAL SECTION ¥IE~
Section at: 349.73
TVB Scale.' ~ inch = 1600 feet
Dep Scale.' ~ inch = ~600 feet
)rawn · 12/21/95
'- A ~ ~ ,,, Marker Identification MD BKB SECfN INCLN
i I ~1 ~. 0 0 0 0.00
~--, " ~ BI ~O~/BU~.~ ~/~00 300 300 0 0.00
C-: C) BUILD 1.5/~00 600 600 8 3.00
...................... I B} BUlk~ ~.0/~00 ~00 ~0~ fi7 ~0,~0
D m . El BUILD 2.5/100 ~600 t577 200 20.50
~ : F) END 2.5/t00 BUILD 3560 292~ ~544 69.49
-~ E , ,; .... ~ ~ G) 9-5/B" CASING POINT 8620 4694 6283 69,49
I ................... ~~r-~ I1 END 2/100 DROP 14391 7041 11498 40.00
~ dj T{RGET 1479] 7347 t]755 40.00
I ' : . ., OR PERMITTllqG
"-"*'~;-'-:';-;-:;:;;:~;;;;;;;:;;; ;;::: ' : ~----.' DNLV
:: -'- :
~_~:' ~ : ................ :::: : :::::
- '.: , ~ 2::--.2.~-~-~-~-_~ -. ........ - ..... ~ ..... . . .
0 800 ~600 2400 3200 4000 4800 5600 6400 7200 8000 BBO0 9600 10400 11200 12000 12B00 13600
-Section Departure
[Anadr~]! [c}95 C25P4 2.5b.04 9:4! Al4 P)
I
'g
iWELL PERMIT CHECKLIST
PROGRAM: exp [] dev~redrll [] serv []
UNIT# ///__~ ON/OFF SHORE__
ADMINISTRATION
1. Permit fee attached .................. ~ Y
2. Lease number appropriate ...............
3. Unique well name and number .............. \ Y
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary. . ~Y
6. Well located proper distance from other wells .....
7. Sufficient acreage available in drilling unit .....
8. If deviated, is wellbore plat included ........
9. Operator only affected party .............. tY
10. Operator has appropriate bond in force ......... ~Y
11. Permit can be issued without conservation order .... tY
12. Permit can be issued without administrative approval..{.Y
13. Can permit be approved before 15-day wait .......
ENGINEERING
14. Conductor string provided ............... ..~
15. Surface casing protects all known USDWs ........
16. CMT vol adequate to circulate on conductor & surf csg. N
17. CMT vol adequate to tie-in long string to surf csg . . '~Y
18. CMT will cover all known productive horizons ...... ~ N
19. Casing designs adequate for C, T, B & permafrost ....
20. Adequate tankage or reserve pit .............
21. If a re-drill, has a 10-403 for abndnmnt been approved.
22. Adequate wellbore separation proposed .......... Y~ N
23. If diverter required, is it adequate .......... ~ N
24. Drilling fluid program schematic & equip list adequate .~ N
25. BOPEs adequate ..................... ~ N
26. BOPE press rating adequate; test to'-~O~5~) psig.~ N
27. Choke manifold complies w/API RP-53 (May 84) ......
28. Work will occur without operation shutdown ....... dY~ N
29. Is presence of H2S gas probable ............ N
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures .... Y N//--
31. Data presented on potential overpressure zones ..... YJ ~ ) ~
32. Seismic analysis of shallow gas zones .......... /~ N /~,,'0-~'--~ ~
33. Seabed condition survey (if off-shore) ........ /W Y N
34. Contact name/phone for weekly progress reports . . ~ . Y N
[exploratory only]
REMARKS
GEOLOGY: ENGINEERING: COMMISSION:
Comments/Instructions:
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.pe Subfile 2 is type....IS
TAPE HEADER
MILNE POINT UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
MWDRUN 1
JOB NUMBER: AK MM 960101
LOGGING ENGINEER: M. WORDEN
OPERATOR WITNESS: J. PYRON
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
OPEN HOLE
MPC-25
500292263800
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
27-AUG-96
MWD RUN 2
M. WORDEN
J. PYRON
MWD RUN 3
M. ~IANIK
D. MOUNTJOY
10
13N
10E
1143
2436
45.45
16.50
CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING 20.000 112.0
3RD STRING 12.250 9.625 8570.0
PRODUCTION STRING 8.500 15283.0
REMARKS:
MWD - EWR4/SLD/CNP/GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
THIS WELL, MPC-25, IS REPRESENTED BY RI/NS 1 - 3.
MWD RI/NS 1 & 2 WERE DIRECTIONAL WITH GAMMA RAY (SGRC),
AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4).
RUN 3 WAS DIRECTIONAL WITH GAMMA RAY (SGRC), ELECTRO-
MAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4), COMPENSATED
NEUTRON POROSITY (CNP), & STABILIZED LITHO-DENSITY
(SLD).
ALL GAMMA RAY DATA WAS ACQUIRED WITH DUAL GAMMA RAY,
GEIGERMUELLER DETECTORS (DGR/SGRC).
THIS WELL WAS DRILLED TO TD AT 15283'.
NO DEPTH SHIFTS WERE APPLIED AS THIS LOG IS THE DEPTH
REFERENCE FOR THIS WELL (PER LARRY VENDAL, BP).
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 142.0
RP 134.0
RHOB 8567.0
NPHI 8536.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
REMARKS:
STOP DEPTH
15225.0
15198.0
15215.0
15206.0
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 195.0 4023.0
2 4023.0 8615.0
3 8615.0 15283.0
MERGED MAIN PASS.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPC-25
: MILNE POINT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
13 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
GR MWD 68 ! AAPI
RPX MWD 68 1 OHMM
RPS MWD 68 1 OHMM
RPM MWD 68 1 OFIMM
RPD MWD 68 1 OHMM
RHOB MWD 68 1 G/C3
DRHO MWD 68 1 G/C3
PEF MWD 68 1 BN/E
NPHI MWD 68 1 PU-S
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 350 01 1
4 90 356 99 1
4 90 358 01 1
4 90 890 01 1
10 FCNT MWD 6~ 1 CPS 4
11 NCNT MWD 68 1 CPS 4
12 FET MWD 68 1 HR 4
13 ROP MWD 68 1 FPHR 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 1684
~ 90 334 31
4 90 334 30
4 90 180 01
4 90 810 01
52
Tape File Start Depth = 15283.000000
Tape File End Depth = 134.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
424187 datums
Tape Subfile: 2
1775 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
£ape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 142.0
EWR4 134.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL.TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
3969.0
3962.0
16-JAN-96
ISC 2.11 / MPDS 1.22
CIM 3.94
MEMORY
4023.0
195.0
4023.0
0
.0
71.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
'~' EWR4 ELECTROMAG. RESIS. 4
DGR DUAL GAMMA RAY
$
TOOL NUMBER
P0459CRG8
P0459CRG8
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
12.250
112.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
SPUD
9.30
70.0
9.5
600
10.0
3.000
2.710
3.000
4.400
68.0
86.0
68.0
68.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS:
CN
WN
FN
COUN
STAT
MWD RUN 1.
$
: BP EXPLORATION (ALASKA)
: MPC-25
: MILNE POINT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
GR MWD 68 1 AAPI 4
RPX MWD 68 1 OHMM 4
RPS MWD 68 1 OHMM 4
RPM MWD 68 1. OHMM 4
RPD MWD 68 1 OFIMM 4
FET MWD 68 1 HR 4
ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 180 01 1
4 90 810 01 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 252
Tape File Start Depth = 4025.000000
Tape File End Depth = 134.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 62265 datums
Tape Subfile: 3 317 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 3967.0
EWR4 3959.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
8561.0
8554.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
DGR DUAL GAMMA RAY
$
18-JAN-96
ISC 2.11 / MPDS 1.22
CIM 3.94
MEMORY
8615.0
4023.0
8615.0
0
68.0
71.6
TOOL NUMBER
P0459CRG8
P0459CRG8
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
12.250
112.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MF~ASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
SPUD
9.40
55.0
9.5
600
5.5
3.000
1.790
3.000
4.400
68.0
118.0
68.0
68.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN) :
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS:
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPC-25
: MILNE POINT
: NORTH SLOPE
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 RPX MWD 68 1 OHMM
3 RPS MWD 68 1 OHMM
4 RPM MWD 68 1 OHMM
5 RPD MWD 68 1 OHMM
6 FET MWD 68 1 HR
7 ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 180 01 1
4 90 810 01 1
* DATA RECORD
(TYPE# 0)
998 BYTES *
,28
Total Data Records: 302
Tape File Start Depth = 8620.000000
Tape File End Depth = 3950.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 498916 datums
Tape Subfile: 4 367 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 8556.0
EWR4 8529.0
SLD 8567.0
CNP 8536.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
'HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
15225.0
15198.0
15215.0
15206.0
25-JAN-96
ISC 2.11 / MPDS 1.22
CIM 3.94
MEMORY
15283.0
8615.0
15283.0
0
37.4
71.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD LITHO DENSITY
DGR DUAL GAMMA RAY
$
TOOL NUMBER
P0470CRNSLDG6
P0470CRNSLDG6
P0470CRNSLDG6
P0470CRNSLDG6
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
8.500
8570.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MI/D CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
10.20
46.0
9.5
600
3.5
1.500
.710
2.000
2.100
70.0
155.0
62.0
66.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
SANDSTONE
2.65
HOLE CORRECTION ~N) :
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 3.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPC-25
: MILNE POINT
: NORTH SLOPE
: ALASKA
0.500
.0
0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
13 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 RPX MWD 68 1 OHMM
3 RPS MWD 68 1 OHMM
4 RPM MWD 68 1 OHMM
5 RPD MWD 68 1 OHNM
6 RHOB MWD 68 1 G/C3
7 DRHO MWD 68 1 G/C3
8 PEF MWD 68 1 BN/E
9 NPHI MWD 68 1 PU-S
10 FCNT MWD 68 1 CPS
11 NCNT MWD 68 1 CPS
12 FET MWD 68 1 HR
13 ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4
4
4
4
4
4
4
4
4
4
4
4
4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 350 01 1
4 90 356 99 1
4 90 358 01 1
4 90 890 01 1
4 90 334 31 1
4 90 334 30 1
4 90 180 01 1
4 90 810 01 1
* DATA RECORD
(TYPE# 0) 1014 BYTES *
52
Total Data Records: 754
Tape File Start Depth = 15283.000000
Tape File End Depth = 8500.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 252204 datums
Tape Subfile: 5 823 records...
_~nimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 6 is type: LIS
96/ 8/27
01
**** REEL TRAILER ****
96/ 8/27
01
Tape Subfile: 6 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Tue 27 AUG 96 2:54p
Elapsed execution time = 41.47 seconds.
SYSTEM RETURN CODE = 0