Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-237 ( Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning proiect. They are available in the original file and viewable by direct inspection. //~" ~ ~' ~ File Number of Well History File PAGES TO DELETE Complete RESCAN ,Gdlor items - Pages: Grayscale, halftones. Dictums, graphs, charts- Pages Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED Logs of various kinds [] Other COMMENTS: Scanned by: Beverly Diann~'~~athan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent ~~..Lowell Memorandum State of Alaska Oil and Gas Conservation Commission To' Well File: Kuparuk Riv Unit 1R-01A Permit # 198-237 January 13,2001 Re~ Administrative Abandonment Action Kuparuk Riv Unit 1R-01A Permit # 198-237 This memo will remain at the front of the subject well file. Well 1R-01A was replaced by 1R-01B (permit # 200-156, AP1 # 50-029-21404-02) when the permit was approved 10/05/2000. The replacement well incorporates an extension to a new bottom hole location using the existing well bore. This extension, along with the original hole, will be used for production of hydrocarbons. A review of both well files indicates administrative abandonment of the originating well bore is appropriate according to current AOGCC procedures for wells where additional permitted extension is drilled from an existing well bore. 20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data bases require each conductor has only one permit number and AP1 number. Administrative abandonment of the original permit only eliminates duplication in the databases. Information for the original well and its replacement will be maintained in their respective files. Statistical Technicia~,tl,-~__,~ j~~Reservoir Engineer The operator has been notified of this action. All future correspondence with the AOGCC should reflect the new permit number, API number and well data. Permit to Drill No. 1982370 DATA SUBMITTAL COMPLIANCE REPORT 2/5/2002 Well Name/No. KUPARUK RIV UNIT IR-01A Operator PHILLIPS ALASKA INC. APl No. 50-029-21404-01-00 MD 12171 TVD 6678 Completion Date 2/17/2000 Completion Status l-OIL Current Status ADMA UIC N REQUIRED INFORMATION Mud Log N._9_o Samples N~o Directional Survey ~ x,/2.4~ , -2~2__~ - _-.._5~_._~ ~_~2£,' ~_ 2- ~_ ~'2__~___-i~--_2 __ ._2~-.7.7__-~-~-'2 ~2~._-'£'-2 5'?Y~--~ '~-~__- C'_-~£2-~--__-_~_.~ 2~ _~2. ..... ~'_5~2--~'~-~_21 .................... ~--.~ 7~ ~_~ ~C-'--'~ _._2~ ~ ~ '~i'"i ~_7~__-.-~ __ '" -'~-'~ '-- '2'' DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ lnterval Data Digital Digital Log Log Run OH / Type Media Format Najne Scale Media No Start Stop CH ;-L'~'''~ 3W~.~P'~P/~s'ci~'~ ................. 5 .................... I~IN,~L .....6080 8'158' (data taken from Logs Portion of Master Well Data Maint) Dataset Received Number Comments C'H ' 2/4/~000 ~k"" SCMT ~,) ~ ),6~ ~ 5 FINAL 6080 8158 CH 2~4~2000 BL(C) ~'"". RST-WFL 5 FINAL 7800 10243 CH 5/12/2000 tL,'/ DGR/EWR4-MD L,-'"" 25 FINAL 6479 12171 OH 2/16/2000 '-~ ~ PDC/GR/CCL / ~,~/'~ ~t~5 FINAL 8460 '10720 CH 5/31/2000  L~'''' PDC/GR/CCL/?/%~, ,~.~.¢'~ 5 FINAL 8400 10184 CH 5/31/2000 C 5/31/2000 09614..,," 8470-10720 ~'~., '~'-~ Q:.~-- DGR/EWR4-TVD t,/' 25 FINAL 5315 6711 OH 2/16/2000t,~ R SRVY RPT 90 12171 OH 1/6/2000 SPERRY 6397.. ,L--'"~'SCMT (..~ i~;:'~;, ?-&~',~ 5 FINAL 7670 10700 CH 3/14/2000.' BL(C) q// ' O 1/26/2000 09095~/ 6464-12127 ~/ C 5/31/2000 09615L,//8404-10185 ,~t:,~.;. ~r..~.~,.~ Well Cores/Samples Information: Interval Dataset Name Start Stop Sent Received Nnmber Comments ADDITIONAL INFORMATION Well Cored? Y/(~ ~C_hips-l~¢o'} . . " .A.~a. ly~s_Reeeh~e~. ~d-N Daily History Received? ~N Formation Tops Receuived? (~-~/N DATA SUBMITTAL COMPLIANCE REPORT 2/5/2002 Permit to Drill No. 1982370 Well Name/No. KUPARUK RIV UNIT IR-01A Operator PHILLIPS ALASKA INC. AP! No. 50-02%21404-01-00 MD 12171 TVD 6678 Completion Date 2/17/2000 Completion Status 1-OIL Current Status Comments: ADMA UIC N ~_~'Z_%L%%L-&_~7._~-L--_~Z_-.~_ZZT---~-?_£%_q_. Z-~C~L~-'C~.%Y_~-_ZZ2'L.L_-_LL%2_.X.ZZ_.'.Z_-ZZZE.Z~ ................................ TL.7_ ..~'Z-.___-Z'ZZ' ._% Z. ZL.ZZ~..%%Zi X'iL_'%'-.Z-.-__~_Z__.%Z_Z 1%TZZi ........ - ........ Compliance Reviewed By: ............................. Date: ....... Schlumberger NO. 153 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Kuparuk Color Well Job # Log Description Date BL Sepia Print CD 3K-02 t.~lC_. INJECTION PROFILE 000509 I 1 30-17 ~ INJECTION PROFILE 000509 I 1 1R-01A ~ ~/~ IV 20087 MGR/CCL 000215 I I 1 1R-01A ~. ¢~t~ ~- 20088 MGR/CCL 000217 I I I RECEIVED s~.~: ~^~: M,~.v. ~ ! Cons. Commission Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907J~-.~3q~lT& 5/23/00 Schlumberger NO. 110 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Kuparuk Color Well Job # Log Description Date BL Sepia Print 1 L-26A GAMMA RAY COLLARS 000427 I 1 1Q-06 LEAK DETECTION LOG 000425 I 1 1Y-12 L4~ (eL- INJECTION PROFILE 000418 I 1 1 R-01A RST WFL W/PROD PROFILE 000423 I I SIGNE DATE: Alaska Oil & Gas Cons. Commission Please sign and return one'~opy of this transmittal to Sherrie at the above address or fax to (907) 561-8317, TImbrElS.e 5/3/OO ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 27, 2000 Mr. Robert Christenson Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 /,~ R 2 8 2000 gJa~ 0ii & Gas Cons, Commi~io~ Subject: 1R-01A (Permit No. 198-237) Well Completion Report Dear Mr. Commissioner: Enclosed is the well completion report for the completion on KRU 1R-01A. If there are any questions, please call 265-6120. Sincerely, Graham L. Alvord Kuparuk Drilling Team Leader AAI Drilling GLA/skad STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil [~ Gas F~ Suspended D Abandoned E] Service D'~; ..... .~- ,_ · ~ '.~-,--vc, ....... ~'~ 2. Name of Operator ~ ~?~-~-**i0~~ 7. Permit Number ARCO Alaska, Inc. ~,~'~-'~'~ ~ 198-237 3. Addr~s: -~.'-...' --~ ~ ~ ;~;~:4-%~,~:'*~ 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 '¥:~v. ~'~L~'.~ 50-029-21404-01 4. Location of well at sudace ' :-"-"~-~*~.'"-:~,- 9. Unit or Lease Name 154' FNL, 139' FWL, Sec. 20, T12N, R10E, UM (ASP: 539829.8, 5991050.1) Kuparuk River Unit At Top Producing Inte~al 10. Well Number 1957' FNL, 1997' FEL, Sec. 20, T12N, R10E, UM (ASP: 542986, 5989267) 1R-01A A tTotal Depth. ,~,/~ 11. Field and Pool 266' FNL, 2315' FWL, Sec. 29, T12N, R10E, UM (ASP: 542049.7, 5985673) , .,.~__,_: Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease D~ignation and Serial No. . ;:.., ~~ Kuparuk River Oil Pool 82' RKB feet~ ADL 25635 ALK 2568 - - 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. ~15. Water Depth, if o~hore 16. No. of Completions November 28, 1999 December 13, 1999 December 24, 1999~ WA feet MSL 1 ~17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Suwey ~20. Depth where SSSV set 21. Thickn~ of Permafrost 12171' MD / 6678' TVD 10850' MD / 6702' TVD :YES ~ No ~~ WA feet MD 1900' (approx) 22. Type Electric or Other Logs Run ~ G~Res, CCL 23. CASING, LINER AND CEMENTING RECORD S~ING DE~H MD CASING SIZE ~. PER ~. G~DE TOP BOSOM HOLE SIZE CEME~ING RECORD~ AMOUNT PULLED 16" 62.5~ H-40 Sudace 115' 24" 250 sx CS II 9.625" 36~ J-55 Sudace 4380' 12-1/4" 1250 sx PF E III & 420 sx PFC 7" 26~ J-55 Suda~ 6479' 8-1/2" 65 sx Cla~ G 3.5" 9.3~ L-80 6243' 10915' 6.125" 475 sx Cla~ G 24. Pedorations open to Production (MD + TVD of Top and BoSom and 25. TUBING RECORD inte~al, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3.5" 6285' 6243' 10011'-10350' MD 6704'-6698' TVD 4 spf 26. ACID, F~CTURE, CEMENT SQUEEZE, ETC. 9338'-9390' MD 6720'-6718' TVD 4 spf DE~H INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9403'-9850' MD 6718'-6714' TVD 4 spf N/A 8588'-8665' MD 6685'-6700' TVD 4 spf 8868'-9232' MD 6709'-6718' TVD 4 spf 27. PRODUCTION TEST Date First Production ,Method of Operation (Flowing, g~ lift, etc.) March 7, 2000 Flowing Date of T~t Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO 4/20/2000 12.0 Test Period > 316 268 396 209~ 581 Flow Tubing Casing Pr~sure Calculated OIL-BBL GAS-MCF WATER-BBL OIL G~VI~ - APl (cmO 215 psi 1332 24-Hour Rate > 632 536 792 24° 28. CORE DATA Brief d~cription of lithology, porosi~, fracture, apparent dips and presence of oil, g~ or water. Submit core chips. No Cores /.?R 2 8 2000 Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. NAME GEOLOGIC MARKERS TRUE VERT. DEPTH Top Kuparuk D Top Kuparuk A MEAS. DEPTH 7682' 8360' 6365' 6639' 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. Annulus left open - freeze protected with dies 31. LIST OF A-FI-ACHMENTS Summary of Daily Operations, Directional Survey 32. I hereby certify that the following is true and correct to the best of my knowledge. Questions? Call Bill Lloyd 265-6531 Signed /~,.- ~-- ~'-¢ Title DrillinaEnaineerinaSuDervisor Date G. Alvord INSTRUCTIONS Prepared by Sharon AIIsup-Drake General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Oth er-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Date: 02/04/00 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 1 WELL:iR-01A WELL_ID: AK0037 TYPE: STATE:ALASKA COUNTY: NORTH SLOPE EAST FIELD: KUPARUK RIVER UNIT SPUD:il/25/99 START COMP: RIG:POOL 6 WI: 0% SECURITY:0 BLOCK: FINAL: API NUMBER: 50-029-21404-01 11/23/99 (D1) TD/TVD: 0/0 SUPV:FRED HERBERT MW: 0.0 VISC: 0) MOVE TO iR PAD. 0 PV/YP: 0/ 0 Prepare rig for move to 1R-01 ST. APIWL: 0.0 11/24/99 (D2) TD/TVD: 115/115 SUPV:FRED HERBERT MW: 0.0 VISC: ( 115) SPOT MODULES 0 PV/YP: 0/ 0 APIWL: 0.0 Continue to rig down and move rig to iR pad. Hold PJSM. 11/25/99 (D3) TD/TVD: 0/115 SUPV:FRED HERBERT MW: 11.7 VISC: 68 PV/YP: 30/31 0) TESR BOPE APIWL: 6.0 Set rig over well. Rig accepted @ 1500 hrs. Open well, displace well with mud. Shut down and check for flow. Well static on both sides. 11/26/99 (D4) TD/TVD: 0/115 SUPV:FRED HERBERT MW: 11.7 VISC: 67 PV/YP: 28/32 0) P/U DP APIWL: 5.8 NU BOPE and test to 250/3500 psi. PJSM. Pull tubing. 11/27/99 (D5) MW: 10.8 VISC: 68 PV/YP: 21/34 APIWL: 5.6 TD/TVD: 0/115 ( 0) CUT WINDOW SUPV:FRED HERBERT/ M. WINFREE PJSM. Run bridge plug and set @ 6505'. Test casing to 3500#, OK. PU whipstock. 11/28/99 (D6) MW: 10.8 VISC: 49 PV/YP: 18/16 APIWL: 5.6 TD/TVD: 6508/5335 (6508) WOC ~ SUPV:FRED HERBERT/ M. WINFREE RIH with Whipstock. Cut window from 6479' to 6491', drill to 6508'. Circ weighted sweep around. Observe well flowing a small amount, set back 1 stand to keep TD from freezing. Shut in well. Circ out thru choke, no gas no oil. Lost 30 bbl while going thru choke, flow back thru choke. Circ and condition mud, weight up to 10.8 hvy. Perform LOT, 12 ppg EMW. Monitor well, OK. ~ ,.~..~. Date: 02/04/00 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 2 11/29/99 (D7) MW: 10.8 VISC: 54 PV/YP: 24/20 APIWL: 6.6 TD/TVD: 6519/5342 ( 11 PU DP SUPV:FRED HERBERT/ M. WINFREE Circ prep for squeeze. PJSM. Test lines to 2500#. Pump cement. Perform squeeze. Drill firm cement to 6508 new formation to 6519' Perform LOT, 12.5 ppg EMW. 11/30/99 (D8) MW: 10.9 VISC: 44 PV/YP: 15/25 APIWL: 4.0 TD/TVD: 6519/5342 ( 0) M/U BHA SUPV:G.R. WHITLOCK/ M. WINFREE P/U 4" D.P. Break circ. Stop pump and slide through window w/no drag or bobble. Start pump and rotate last 10' of hole. Drill from 6518' to 6550'. Motor stalling frequently. Displace LSND mud w/GEM mud. Drill from 6550' to 6606' Circ and condition mud. 12/01/99 (Dg) MW: 10.9 VISC: 45 PV/YP: 17/33 APIWL: 4.2 TD/TVD: 6995/5860 ( 476) CIRC TO CLEAN HOLE SUPV:G.R. WHITLOCK RIH. Retake surveys 8 6546' and 6573'. Wash to bottom clean up possible junk. Drill from 6670' to 6798'. Take additional surveys. Drill from 6798' to 6995' 12/02/99 (D10) MW: 10.9 VISC: 43 PV/YP: 18/26 APIWL: 4.4 TD/TVD: 7144/5892 (149) DRILLING ~ 7300' SUPV:G.R. WHITLOCK Drill from 6995' to 7108' Circ to clean hole and lower ECD's. Circ weighted sweep ~ 12.9 ppg. Drill from 7108' to 7128'. Motor stalling. CBU. POOH change bit. RIH. Held safety drill. RIH. CBU. Drill from 7128' to 7144' 12/03/99 (Dll) MW: 10.9 VISC: 42 PV/YP: 17/25 APIWL: 3.8 TD/TVD: 7826/6471 ( 682) TEST BOPE SUPV:G.R. WHITLOCK Drill from 7144' to 7826'. CBU Monitor well. POOH. 12/04/99 (D12) MW: 10.9 VISC: 41 PV/YP: 18/25 APIWL: 3.8 TD/TVD: 7890/6509 ( 64) DRILLING ~ 8010' SUPV:G.R. WHITLOCK POOH to 6400'. Held Safety meeting. POOH, Test BOPE to 250/3500 psi. RIH. Wash to bottom. CBU to condition mud. Drill from 7826' to 7890' 12/05/99 (D13) MW: 10.9 VISC: 41 PV/YP: 20/24 APIWL: 3.6 TD/TVD: 8560/6676 ( 670) DRILLING ~ 8816' SUPV:G.R. WHITLOCK Drill from 7898' to 8560' ~~%~'~ ?~ ...... ~'? .... 2000 · ... ~ ~ ~' Date: 02/04/00 ARCO ALASKA INC. Page: 3 WELL SUMMARY REPOR~ .... ~ ....... ~ ~ ..... .... 12/06/99 (D14) Nr~: 10.9 vxsc: 39 PV/YP: 14/24 APIWS: 3.4 TD/TVD: 9266/6270 ( ?06) DRILLING 6 9440' SUPV:G.R. WHITLOCX Drill from 8560' to 9100' Circ hi-wt sweep. Pump dry job. POOH from 9100' to 7500' Fill pipe and wash last 2 stands to bottom. Drill from 9100' to 9266' 12/07/99 (D15) MW: 10.9 VISC: 38 PV/YP: 13/23 APIWL: 3.4 TD/TVD: 9923/66712 ( 657) DRILLING ~ 10067' SUPV:G.R. WHITLOCK Drill from 9266' to 9890' Unable to slide ~ 9890'. Circ and condition mud. Pump hi-vis sweep w/nut plug. Added lubetex to mud and drag dropped back. Drill from 9890' to 9923' 12/08/99 (D16) MW: 11.1 VISC: 41 PV/YP: 14/27 TD/TVD:10258/6696 (335) DRILLING ~ 10448' SUPV:G.R. WHITLOCK APIWL: 3 . 2 Circ and work pipe while taking surveys. Drill from 9923' to 10156' Circ barafibre sweep. Circ and increase MW to 11.1 ppg. Pump out of hole from 10156' to 8812' Pump dry job and POOH to 6479'. RIH. Wash and ream last 2 stands to bottom. Drill from 10156' to 10258' 12/09/99 (D17) MW: 11.1 VISC: 40 PV/YP: 18/28 TD/TVD:l1026/6690 i 768) DRILLING ~ 11185' SUPV:G.R. WHITLOCK Drill from 10258' to 11026'. PJSM. AP IWL: 2.7 12/10/99 (D18) MW: 11.0 VISC: 41 PV/YP: 19/27 TD/TV]D:l1386/6650 ( 360) DRILLING ~ 11510' SUPV:G.R. WHITLOCK APIWL: 2.7 Drill from 11026'-11280'. CBU w/weighted sweep. Monitor well. POOH to 8976' Hole tight from 10915' to 10738' Hole slick above previous wiper trip point. RIH. W/R through bridge ~ 10900'. W/R to bottom w/no more problems. Drill from 11280' to 11386' 12/11/99 (D19) MW: 11.0 VISC: 41 PV/YP: 18/28 APIWL: 2.5 TD/TVD:l1954/6670 ( 568) DRILLING ~ 12060' SUPV:G.R. WHITLOCK Drill from 11386' to 11954'. Circ and condition mud. 12/12/99 (D20) MW: 11.0 VISC: 42 PV/YP: 19/29 TD/TVD:12171/6670 ( 217) CIRC AND SPOTTING LINER RUNNING PILL SUPV:G.R. WHITLOCK APIWL: 2 . 5 Drill from 11954' to 12171' Pump weighted sweep. Pump out of hole from 12171' to 8907'. Hole tight ~ 10900', 10820', 10730'. Break circ, pump dry job, and blowdown topdrive. POOH to shoe. tight spot ~ 7700'. CBU. No gas on bottoms up. RIH to 11892'. Ream from 11892' to 12052' Date: 02/04/00 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 4 12/13/99 (D21) TD/TVD:12171/66707 ( SUPV:G.R. WHITLOCK MW: 11.0 VISC: 55 PV/YP: 20/42 0) DOWNLOADING MWD APIWL: 2.5 Wash from 11985'-12171' Pump weighted sweep. POOH to 11700' CBU. Spot 280 bbl liner pill. POOH to 8817'. Hole not taking correct fill. Monitor well, no flow. RIH. Pump out of hole 35 stds. Hole took proper fill. POOH. Tight from 7690' to 7730' Well dead. Pump out of hole 5 stands to shoe. 12/14/99 (D22) MW: 11.0 VISC: 47 PV/YP: 23/31 APIWL: 2.8 TD/TVD:12171/66707 ( 0) SUPV:FRED HERBERT Pump out of hole. Monitor well ~ shoe. Hold PJSM. Run 3.5" liner. Break circ every 1500' Pick up packer & liner hanger. 12/15/99 (D23) TD/TVD:12171/66707 ( SUPV:FRED HERBERT MW: 11.0 VISC: 48 PV/YP: 24/30 0) RIH W/ CLEAN OUT ASSY. APIWL: 3.0 RIH to 6364' w/liner. Circ & cond. mud. RIH w/liner, hit bridge ~ 7960' Circ and work liner down to 8010'(hard). Work liner up to 7998', set back stand, continue working liner up to 7975'. Circ continue working liner up. Liner moving up. Continue pumping out of hole to liner hanger. POOH w/3.5" liner. Set test plug. Test BOPE to 250/3500. Clean out assy. 12/16/99 (D24) TD/TVD:12171/6670 ( SUPV:FRED HERBERT MW: 11.0 VISC: 43 PV/YP: 14/26 0) WASH & REAM WITH HOLE OPENER APIWL: 3.4 RIH w/clean out assy. Ice plugs in DP, thaw out same, to 6443' Circ & cond mud ~ window. RIH to 7691' Wash & ream from 7691' to 8173' Hole packing off & tight @ 8173'. Set back stand, rotate, recip pipe, circ bttms up. Wash & ream thru intervals that were packing off from 8173' to 8750' PJSM. Wash and ream from 8750' to 9133' 12/17/99 (D25) TD/TVD:12171/6670 ( SUPV:FRED HERBERT MW: 11.2 VISC: 48 PV/YP: 18/34 0) WIPER TRIP APIWL: 2.8 Circ densified barofiber sweep around. Wash from 9133' to 9998' Wash & ream from 9998' to 10095'. Circ sweep around ~ 10095' Wash from 10095' to 10672' Packing off ~ 10672' ream & clean up hole. Wash & ream from 10672' to 11862' Hole packing off ~ 10672' to 11050' & 11633' to 11826' Date: 02/04/00 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 5 12/18/99 (D26) TD/TVD:12171/6670 SUPV:FRED HERBERT MW: 11.2 VISC: 46 PV/YP: 21/32 0) WORK ON SCR PROBLEMS APIWL: 2.8 Wash & ream from 11826' to 12171' Circ & cond mud, pump sweep. Monitor well, pump out of hole from 12171' to 6407' Hole in good shape. Recondition commutator on drawworks 'B' motor, replace brush holder on 'A' motor. RIH. Drawworks 'A' motor would not operate. POOH to window. Work on SCR 1 & 2. RIH to 8562' stop to fill pipe, lost power to drawworks & mud pumps, SCR's would not assign. Rig up to circ w/injection pump. Circ & rotate pipe. Work on SCR's. 12/19/99 (D27) MW: 11.2 VISC: 45 PV/YP: 18/35 APIWL: 2.6 TD/TVD:12171/6670 ( 0) WORK ON SCR'S SUPV:FRED HERBERT Work on SCR's. Circ w/injection pump & rotate pipe. POOH from 8526' to 6407' Trouble shoot SCR problems, check traction motors. 12/20/99 (D28) TD/TVD:12171/6670 ( SUPV:FRED HERBERT MW: 11.2 VISC: 44 PV/YP: 17/35 0)POOH TO RUN LINER APIWL: 2.4 Work on SCR's. Work pipe, SCR failed. Continue to work on SCR. Trip in hole to 8137' Bridge ~ 8137'. Ream thru bridge, circ bottoms up. RIH to 10062'. No hole problems. Circ & cond mud @ 10062'. RIH to 11979'. Ream from 11979' to 12171' 12/21/99 (D29) TD/TVD:12171/6670 ( SUPV:FRED HERBERT MW: 11.2 VISC: 45 PV/YP: 21/31 0) RUN LINER, P/U HANGER APIWL: 2.6 Circ & cond mud for liner job. POOH for liner. Pump out. Tight spots ~ 8140', 7690' Circ bttms up ~ 7600'. Continue w/POOH, pump out to window. Tight ~ 7540' work thru spot. Circ bttms up ~ window. POOH to run liner. Hold PJSM. Run 3.5" liner. 12/22/99 (D30) TD/TVD:12171/6670 ( SUPV:FRED HERBERT MW: 11.2 VISC: 45 PV/YP: 21/33 0) POOH W/ RUNNING TOOL APIWL: 2.4 RIH w/liner. RIH w/hanger/packer assembly. Circ & cond mud ~ window. RIH w/liner work thru tight spots ~ 7130', 7917', 8300' Circ bttms up @ 8300'. RIH w/liner, wash down each stand to 10292' Circ hole clean @ 10292' RIH w/liner. Bridge ~ 10915' Hole packing off. Circ & work pipe until pack off cleared up. Attempt to work thru bridge ~ 10915' w/ no success. Pump Lube Tex pill. Can move string up but not down past 10915' Date: 02/04/00 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 6 12/23/99 (D31) TD/TVD:12171/6670 ( SUPV:FRED HERBERT 12/24/99 (D32) TD/TVD:12171/6670 SUPV:FRED HERBERT 12/25/99 (D33) TD/TVD:12171/6670 ( SUPV:FRED HERBERT MW: 11.2 VISC: 46 PV/YP: 22/32 0) RIH W/ PACKER ASSY & OVERSHOT APIWL: 2.6 Attempt to work liner down. PJSM. Pump cement. Bump plug. Check floats. Release f/hanger. Circ & cond. No cement or spacer to surface. POOH. RIH w/tubing cutter. Cut liner @ 6315'. RIH w/spear assembly. Latch on to liner. Circ bttms up. Pump slug. POOH w/liner packer assy & liner. MW: 8.6 VISC: 28 PV/YP: 1/ 0 0) FREEZE PROTECT WELL APIWL: 0.0 POOH to PKR. liner. RIH w/overshot to top of stub(6315') . Latch on to stub. Pressure to check pack off. Pressure up & set hanger. Set packer. Circ bttms up. POOH. Test casing to 3000 psi. PJSM. Run 3.5" tubing. Sting into PBR. Circ bttms up to remove thick mud. Displace well. MW: 8.6 VISC: 28 PV/YP: 1/ 0 0) RIG RELEASED F/ 1R-01A ~ 22:00 HRS APIWL: 0.0 Displace well w/seawater. Test tubing to 3000 psi, annulus to 3000 psi. Freeze protect well with diesel. Install BPV. PJSM. ND BOPE, NU tree and test to 5000 psi, OK. Rig released from 1R-01A ~ 2200 hrs. ARCO Alaska, Inc. KUPARUK RIVER UNIT ,~, WELL SERVICE REPORT '~' K1(1R-01A(W4-6)) WELL JOB SCOPE JOB NU'MBER " 1 R-01A PERFORATIONS-CT. 0207001829.7 DATE DAILY WORK UNIT NUMBER 02/17/00 COMPLETE PERFORATIONS AND SWAP TO DIESEL UNIT #6 DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR 2 YESI YES DS-JON ES KRALICK FIELD AFC# CC# Signed ESTIMATE AK0037 230DS10RO InitialTbgPress FinalTbgPress Initial lnner Ann Final lnner Ann IlnitialOuterAnn I Final Outer Ann 0 PSI 150 PSI 0 PSI 0 PSIII0 PSI 0 PSI DALLY SUMMARY IPERFORATE: 8588' - 8665' W/2 1/2" HSD PJ 2506 4 SPF, SWAP HOLE TO DIESEL FROM 11.6# BRINE FROM 8400' TO ' SURFACE - INSTALL BACKPRESSURE VALVE RIG DOWN WORK PLATFORM AND COIL UNIT TIME 19:00 LOG ENTRY SAFETY MEETING W/1 VECO, 3 DS, 3 SWS, 1 APC. DISCUSS HANDLING OF GUNS (BREAK DOWN AND MAKING UP), WELL CONTROL AND POSSIBILITY OF LIVE GUNS. 19:15 POH FROM 500', OBSERVING WHP, TAG UP IN WELLHEAD, 0 PSI WHP 19:30 WHP 0 BREAK OFF OF WELLHEAD, OBSERVE STABLE FLUID LEVEL. PU DEPLOY PIPE SLIPS ON DEPLOYMENT SUB, STAB TIW VALVE, PULL 2 JOINTS W/CRANE,CONFIRM FIRED GUNS. 20:15 STAB INJECTOR ON DECK, RAISE T-BAR, BREAK OUT RUN #4, MU RUN #5 TO PERFORATE INTERVAL 8588' - 8665' W. 2 1/2" HSD PJ 2506 4 SPF. 21:15 PU MU INJECTOR, PRESSURE TEST WEATHERFORD MHA TO 4000 PSI, OK. DISPLACE DIESEL FROM CT W/ 11.6#/GAL BRINE 22:25 MU MHA TO GUN BHA, STAB ONTO WELLHEAD, RIH W/GUN RUN #5, TAKING BRINE RETURNS THRU CHOKE TO TANK 23:55 RIH TO FLAG @ 8399', PU WEIGHT 14000#, CORRECT TO BOTTOM SHOT. 00:10 RIH TO 9680', PU TO POSITION GUNS 8588'- 8665', PUMP 2 BBL 11.6# BRINE, LOAD 5/8" ALUMINUM BALL, PUMP 2 BBL BRINE, 31 BBLS DIESEL. 1.5 BPM, 2500 PSI CTP. 00:50 BALL ON SEAT, GUNS FIRE 3700 PSI CTP, GOOD SURFACE INDICATION, POH W/FINAL GUN RUN PUMPING 11.6 #/GAL BRINE DOWN BACKSIDE. 02:10 TAG UP IN WELLHEAD, OBSERVE WHP 02:40 WELL STABLE BREAK OFF INJECTOR, BREAK OUT AND LAY DOWN SWS GUN BHA. ARCO Alaska, Inc. KUPARUK RIVER UNIT WELL SERVICE REPORT '~' K1(1R-01A(W4-6)) WELL JOB SCOPE JOB NU'MBER " 1 R-01A DRILLING SUPPORT-CAPITAL 1227990826.3 DATE DAILY WORK UNIT NUMBER 02/16/00 PERFORATE (NEW WELL) UNIT #6 DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR 6 NOI NO DS-CORLIS MENKE FIELD AFC# CC# Signed ESTIMATE AK0037 230DS10RG Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann I Initial Outer Ann I Final Outer Ann 0 PSI 0 PSI 0 PSI 0 PSII 0 PSII 0 PSI DAILY SUMMARY IPERFORATE · 9490' - 9850' W/2 1/2" HSD PJ 2006 4 SPF, 9338' - 9390', 9403' - 9489' 2 1/2" HSD PJ 2506 4 SPF -- MEMORY LOG FOR DEPTH CONTROL - PERFORATE: 9232' - 8868' (364') TIME LOG ENTRY 19:00 CONTINUED FROM PREVIOUS WSR. RIH W/GUN RUN #2 TO PERFORATE INTERVAL 9490' - 9850' W/2 1/2" HSD PJ 2006 4 SPF. 19:05 TAKING RETURNS TO TANKS TRAPPING 150 PSI WHP. 20:00 RIH PAST @ 9292', POH WEIGHT CHECK - 17000#, CORRECT TO BOTTOM SHOT OF BHA. CONTINUE RIH 20:10 RIH TO 9875', PU TO POSITION BOTTOM SHOT @ 9850'. TRAP 200 PSI WHP AS DISPLACE COIL. PUMP 3 BBLS 10.2# FLO-PRO (LAST OF FP), 2 BBLS 11.6 # BRINE, DROP 5/8" BALL.,2 BBLS 11.6# BRINE AND 31 BBLS DIESEL. 1.5 BPM, 2800 PSI. 20:45 BALL ON SEAT W/31 BBLS AWAY, 2500 PSI, SEE INDICATION OF SHOTS, REEL MOVEMENT. POH TO 9400', PUMPING 11.6 #/GAL DOWN BACKSIDE,.5 BPM 1000 PSI 21:00 BULL HEAD 15 BBL BRINE DOWN BACKSIDE 1.8 BPM, 2200 PSI. POH PUMPING 11.6 #/GAL BRINE, .5 BPM, 800 PSI, TO KEEP HOLE FULL, 30 BBLS 22:00 TAG UP IN WELLHEAD. OBSERVE WHP. BLEED TO 0 PSI, OPEN TO RETURN TANK, FLOW SLOW TO STEADY TRICKLE, CLOSE CHOKE, OPEN WHITEY ON LUBRICATOR AND MONITOR. 22:20 WELL APPEARS TO BE STABLE. PUMP BRINE DOWN KILL LINE, .2 BBLS GET RETURNS. TIME LOG ENTRY 22:40 POP INJECTOR/LUB FROM WELLHEAD, OBSERVE FLUID LEVEL 5' DOWN AND STABLE. BREAK OF CT AND MHA. ATTEMPT TO PUMP DIESEL TO FP CT W/DIESEL. CTC LEAKING. POSSIBILITY OF GUNS HAVING NOT FIRED. 22:50 TAKE CT TO BACK DECK W/TEST PLATE ON IT, PUMP DIESEL TO FINISH FREEZE PROTECT CT. HOLE FLUID LEVEL REMAINING STABLE. BREAK OUT DEPLOYMENT SUB, BLANK SUB, CONFIRM SHOTS FIRED, BALL RECOVERED. 23:30 CONTINUE BREAKING OUT AND LAYING DOWN GUNS. 00:05 BHA OOH. PU INJECTOR BACK OVER RIG FLOOR, CUT OFF WEATHERFORD CTC AND MHA. 00:40 MU NEW CTC, PULL TEST TO 20K, OK, MU TO WELLHEAD, DISPLACE 30 BBL DIESEL FROM CT W/11.6# BRINE. 01:00 START TO MAKE UP GUN RUN #3. 2 1/2" HSD PJ, 2506 4 SPF. FOR INTERVAL 9338' - 9390', 9403' - 9489'. SWS OAL - 194.12' 02:00 LOWER T BAR, PU INJECTOR UP OVER RIG FLOOR. MU NR SWIVEL, PRESSURE TEST TO 4000 PSI, OK. MU TO DEPLOYMENT SUB, STAB INJECTOR, OPEN CHOKE TO TAKE BRINE RETURNS AS RIH. 02:45 RIH W/BHA FOR PERF RUN #3. TRAP 200 PSI WHP AT CHOKE AS RIH. 04:10 AT FLAG, CORRECT TO LOP AND BHA TO BOTTOM SHOT, SHORT TRIP AND POSITION BOTTOM SHOT @ 9489'. PU WT 17000#. 04:15 PUMP 2 BBL 11.6#/GAL BRINE, LOAD 5/8" ALUMINUM BALL, PUMP 2 BBL BRINE AND DISPLACE W/31 BBLS DIESEL, 1.5 BPM, 2700 PSI CTP, TRAPPING 200 PSI WHP. 04:45 BALL FIRED @ 3900 PSI CTP. POSITIVE INDICATION OF GUNS FIRING. POH, PUMP 11.6 # BRINE DOWN BACKSIDE AS POH. 06:15 TAG UP AT SURFACE, OBSERVE WHP - PULL SPENT GUNS - ALL SHOTS FIRED 07:00 MU MEMORY TOOLS 13.1' INCLUDING CCL AND GAMMA (11.8' TO CCL) - 3.19' OF MHA - RIH TAKING BRINE RETURNS TO TIGER TANK 09:30 BEGIN LOGGING DOWN @ 60 FPM FROM 8400'- SAT DOWN IN PERF DEBRIS @ 10188' CTM - LOG UP FROM 10188' CTM TO 8400' CTM - POOH PUMPING .5 BPM 11.6 BRINE TO REFILL THE HOLE 11:40 OOH W/MEMORY RUN - TGSM ON RIG FLOOR - WELL IS DEAD - REMOVE TOOLS AND CHECK LOGS - GOOD DATA 12:15 SET INJ. DOWN ON DECKAND MAKE UP GUNS FOR RUN #4- 13:50 15:00 17:00 17:30 P/T MHA TO 4000 PSI - DISPLACE COIL W/11.6 BRINE RIH W/410.3' GUNS AND MHA FOR RUN #4 @ 8868'- 9232'- CORRECTED-I' @ FLAG DEPTH OF 8400' DROP .625" BALL - 5 BBLS BRINE AND SWITCH TO DIESEL FOR FREEZE PROTECT ON COIL - 2500 PSI 1.3 BPM BALL ON SEAT AND PRESSURE UP TO 3600 PSI WITH STEEP DROPOFF BUT NO OTHER INDICATION OF FIRING- PUMP UP TO 4260 PSI WITH 1.9 BPM RATE TO CHECK- POOH WHILE FILLING HOLE FROM BACKSIDE .5 BPM 11.6 BRINE @ 150 FT/MIN ARCO Alaska, Inc. KUPARUK RIVER UNIT WELL SERVICE REPORT '~' K1(1R-01A(W4-6)) WELL JOB SCOPE JOB NU'MBER ' " 1R-01A PERFORATIONS-CT. 0207001829.7 DATE DAILY WORK UNIT NUMBER 02/14/00 CT MEM LOG / PERFORATE UNIT #6 DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR 1 NOI YES DS-BIGGERSTAFF KRALICK FIELD AFC# CC# Signed ESTI MATE AK0037 230 DS 10 RO Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann I Initial Outer Ann I Final Outer Ann 0 PSI 0 PSi 0 PSI 0 PSII 0 PSII 0 PSI DAILY SUMMARY REBUILD AND TEST BOP'S, RUN MEMORY LOG (CCL AND GAMMA) - FLAG PIPE @ 9300'[Perf] TIME LOG ENTRY 19:00 MOVING WORK PLATFORM FROM PRUDHOE BAY TO 1R-01 .INFORMATION ON PREVIOUS WSR 19:05 SPOT CT #6 W/14500' OF 1.75 X .109", 33K RF, 32 BBL VOL. WORK TO SHIM AND LEVEL UNIT W/ OUTRIGGERS, RAISE MAST, AND POSTITION UNIT CORRECTLY TO WORK PLATFORM. 21:00 SAFETY MEETING W/1 APC, 1 VECO, 2 WEATHERFORD, 3 DS, 1 ARCO. START TO RIG UP HYDRAULIC HOSES TO BOP'S 23:00 CONTINUE TO HOOK UP BOP'S AND TROUBLESHOOT HYDRAULIC LINES/HOSES, CONNECTIONS ETC. PROBLEMS WITH THE ANNULAR BAG. LINES WERE HOOKED UP BACKWARDS, CLOSED BAG W/NO PIPE IN THEM. 23:30 TROUBLESHOOT ANNULAR PREVENTER. SWITCH HOSES ETC. BAG MALFUNCTIONING. GET TIOGA TRUNKS AND PUT ON PREVENTER. 00:30 BAG STILL DYSFUNCTIONAL, PICK UP INJECTOR TO POSITION OVER WELL. CONTINUE TROUBLESHOOT BOP'S. VALVE CREW ARRIVE AND SERVICE TREE. 01:45 DETERMINE HOSES LABELED NUMBER 1/2 SHOULD BE 7/8. CONSEQUENTLY, HOSES WERE MISLABELED, CONTROL VALVES SWAPPED AROUND. WORK TO REMEDY THE SITUATION. 02:00 HYDRAULIC LINE PROBLEMS IDENTIFIED. FUNCTON TEST BOP, BLIND SHEAR, PIPE SLIPS. OK, RIG UP TO PRESSURE TEST STACK. 02:30 PROBLEMS WITH PUMP CONTROLS IN OPERATIONS CAB FOR TRACTOR. TROUBLESHOOT 03:00 GET TRACTOR CONTROLS, DS CREW CHANGEOUT. SAFETY MEETING W/NEW CREWS TIME 03:30 03:45 03:50 LOG ENTRY FLUID PACK HL, BOP'S, LUB ETC. WITH DIESEL.LEAKING BLOCK VALVE ON KILL LINE. SWITCH TO PUMPING SEAWATER TO WARM UP KILL LINE. PRESSURE TEST TO 4000 PSI, OK. RE- FREEZE PROTECT W/DIESEL. TEST ALL OF ABOVE TO 2000 PSI TO TANKS, CLOSE CHOKE, BLEED OFF DOWNSTREAM TO THE TANKS, TEST TO CLOSED CHOKE TO 4000 PSI, OK, BEGIN BOP TEST.CLOSE PIPE/SLIP RAMS, PUSH-PULL TEST, LOW AND HIGH PRESSURE TEST OK. CLOSE BAG, TEST TO 2500 PSI BELOW, OK, PU AND CLOSE BLIN/SHEARS. TEST FROM BELOW THRU KILL LINE AND BLIND/SHEARS LEAKING. BLEED OFF AND CYCLE RAMS. RE-TEST, NOT HOLDING 04:45 ALL BOP TEST OK BUT BLIND SHEAR. GETTING PARTS TO RE-BUILD. WILL MAKE LOGGING RUN AND RE- BUILD BETWEEN RUNS. BLEED OFF LUB ETC, BREAK OFF OF WELLHEAD. 05:00 05:30 05:50 06:00 06:10 07:20 07:30 07:45 08:03 08:30 08:40 08:55 09:13 09:17 09:38 09:44 10:30 11:30 14:45 15:00 18:59 START TO MAKE UP WEATHERFORD CTC AND MHA. PULL TEST CTC TO 15K. OK, PRESSURE TEST TO 3500 PSI, OK. MHA - 2.20" OD CTC, HYD DISCO (3/4" BALL) BLANK SUB (NO CIRC), 2.0" PORTED SUB. OAL - 3.19' SAFETY MEETING W/SWS AND ALL OF CREW REGARDING MAKING UP LOGGING TOOL, HANDLING ETC. START TO MAKE UP SWS MEMORY GR/CCL. OAL- 13.1' TOTAL BHA OAL = 16.29' MU TO WELLHEAD, ZERO TAGGED UP ON STUFFING BOX. OPEN MASTER VLV 17 1/2 TURNS TO CLOSED CHOKE, O PSI WHP, RIH W/MEMORY LOGGING TOOLS. RIH AT 120 FPM @ 6000', NOT PUMPING AT 7000' WT CHECK 12000#. UP WT AT 8600'. PUH TO 8450' TO LOG DOWN AT 60 FPM. START BRINE DOWN COIL AT 1.0 BPM, RIH AT 9400', MAINTAIN 100 PSI ON WH. TAG BTM AT APROX 10720 CTM RIH WHILE PUMPING, GOT WT BACK AT 10713.5. STOP AT 10690' TO CIRC BTMS UP. GRADUALLY PINCHED WELL BACK TO 900 PSI WHP. BRINE AT NOZZLE. INCREASE PUMP RATE TO 1.5 BPM. OPEN CHOKE TO 800 PSI UPSTM. SWITCH TO 6 BBL FLOPRO PILL WITH 40 OF 61 BBL BRINE UP ANN. 73 BRINE AWAY. SWITCH BACK TO BRINE. 79 AWAY, STILL AT 10690'. GOOD BRINE AT SURF, SWITCH TO FRAC TANK FOR BRINE RECYCLE. DROP RATE TO 0.5 BPM. PUH AT 60 FPM TO 8450' WITH .5 BBL FLOPRO ABOVE US, LAYING IN FLOPRO AND PUMPING .5 BPM. 6.3 BBLS 10.1# FLOWPRO (3.3 #/BBL POLYMER - 125,000 ViS) LAYED ACROSS 10690'-9965' - LOGGED UP TO 9300' CTM AND FLAGGED PIPE - CONTINUED TO POOH LOGGING 60 FT/MIN TO 8450' CTM - POOH @ 80% PUMPING 10.14 NACL SWITCH TO DIESEL TO DISPLACE COIL AND SURFACE LINES - BREAK DOWN BOPS TO REBUILD BLIND SHEARS TEST BOP STACK AFTER REBUILD TO 4000 PSI - BOP'S GOOD TGSM- PERF GUN SAFETY- LOAD GUNS AND EQUIP ON RIG FLOOR- OUT OF FUEL IN THE WORK PLATFORM - SHUT DOWN @ 1700 WAITING ON FUEL END OF REPORT- JOB LOG TO BE CONTINUED ARCO Alaska. Inc. KUPARUK RIVER UNIT ,, WELL SERVICE REPORT K1(1R-01A(W4-6)) WELL JOB SCOPE JOB NU'MBER 1 R-01A DRILLING SUPPORT-CAPITAL 1227990826.3 DATE DAILY WORK UNIT NUMBER 02/15/00 PERFORATING UNIT #6 DAY OPERATION COMPLETE SUCCESSFUL KEY PERSON SUPERVISOR 5 NO NO DS-CORLIS MENKE FIELD AFC# CC# Signed ESTIMATE AK0037 230DS10RG Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann I Initial Outer Ann I Final Outer Ann 0 PSI 0 PSI 0 PSi 0 PSII 0 PSII 0 PSI DAILY SUMMARY PERFORATE 10011'- 10350', 2 1/2" HSD UJ 4 SPF - KILLED WELL W/260 BBL 11.6# BRINE - LOADED RUN #2 (9850' - 9489') TIME LOG ENTRY 19:00 DS CT UNIT #6 RIGGED UP TO WORK PLATFORM. CONTINUE MAKING UP SWS 2 1/2" HSD 31J US 4 SPF GUNS. 19:40 FINISH MAKING UP SWS GUNS. MU NR JT ON MHA, PRESSURE TEST TO 3500 PSI, OK. PUMP 2 BBL METH SPACER, DISPLACE DIESEL FROM CT TO RETURN TANK W/10.0# BRINE. 20:40 STAB CT MHA TO GUNS, MU TO WELLHEAD, RIH W/BHA PERF RUN #1. TOTAL OAL - 388.46', TAKING BRINE RETURNS TO SEGREGATED TANK. 21:00 FREEZE PROTECT PUMP AND BACKSIDE LINE W/METH. 21:10 RIH W/GUN RUN #1. 22:00 WEIGHT CHECK @ 5000' - 5800# 23:00 23:15 23:30 23:50 AT EOP FLAG (9292'), CORRECT TO BOTTOM SHOT (ADD 388.46'), CONTINUE RIH. POSITION BOTTOM SHOT @ 9350', TOP SHOT @ 10011'. HOLD MEETING W/CREW DISCUSS PROCEDURE FOR LOADING AND DISPLACING BALL TO FIRING HEAD, AND (FLUID PUMP ORDER ETC.) PUMP 4 BBL FLO-PRO, 2 BBLS BRINE, LOAD BALL, DISPLACE W/2 BBL BRINE, (BRINE AND FLO-PRO 10.2 #/GAL), 31 BBLS HOT DIESEL @ 1.5 BPM, 3000 PSI CTP. 27 BBLS DISPLACEMENT AWAY, REDUCE RATE TO 1 BPM, 1800 PSI CTP, TRAPPING 50 PSI WHP TIME 23:55 00:45 01:15 01:20 01:30 01:50 02:00 02:25 03:00 LOG ENTRY 31 BBLS AWAY, PRESSURE TO 3400, FIRE GUNS. OBSERVE WHP, APPEARS TO BE STABLE, POH KEEPING HOLE FULL PUMPING BRINE DOWN CT BACKSIDE. CT @ 4500', SHUT DOWN OBSERVE WELL, APPEARS TO BE STABLE, CONTINUE TO POH TAG UP AT SURFACE, OPEN TO TANK AND OBSERVE FLUID LEVEL FILL HOLE, TOOK .75 BPM TO GET HOLE FULL. ISOLATE AND OBSERVE PRESSURE BUILD TO 100 PSI, OPEN CHOKE TO TANKS AND OBSERVE. GETTING A TRICKLE OF RETURNS BREAK OFF INJECTOR AND LUBRICATOR. PU SET PIPE/SLIP RAMS. PUSH-PULL TEST SLIPS. 10 MINUTES GET 5 BBLS RETURNS BACK, WELL FLOWING .5 BPM. FLUSH CT W/DIESEL (ADDITIONAL 6 BBLS). CLOSE CHOKE, PUMP 3,5 BBLS BRINE DOWN WELL. RUN OUT OF BRINE. VAC TRUCK 20 MINUTES OUT. FREEZE PROTECT LINES, MONITOR WELLHEAD PRESSURE. 50 PSI. WHP INCREASED TO 175 PSI, 10.2 #/GAL BRINE.BRINE ON LOCATION. 03:10 PUMP 5 BBL 10.3 #/GAL FLO-PRO, 87 BBLS OF 10.2 #/GAL BRINE, 2 BPM, 2400 PSI 04:10 92 BBLS AWAY, SHUT DOWN PUMPING AND OBSERVE WHP. BLEED TO 0 PSI, FLOWING TO TANK, SHUT IN. 04:40 RIG UP JUMPER LINE ACROSS TREE TO FREEZE PROTECT LINES W/DIESEL. 04:45 WHP STABLE @ 380 PSI. 05:00 CALL FOR 11.6 #/GAL BRINE. GETTING 12 # FROM MI TANK FARM AND CUTTING W/10.2 ON LOCATION. 07:00 MIXED 10.1 BRINE AND 12.0 BRINE TO MAKE AN 11.6# MIXTURE- VERIFIED WITH HYDROMETER 09:00 PUMP THREE BBL MEOH 2000 PSI @ 1.1 BPM DOWN BACKSIDE- SWITCH TO 11.6 BRINE @ 2.5 BPM 2500 PSI - SWITCH TO 10.2# FLOPRO FOR 4 BBLS - SWITCH TO 11.6 BRINE FOR 85 BBLS 3.0 BPM @ 2450 PSI 10:00 ATTEMPT TO BLEED DOWN WELL - PRESSURE RISING ON SURFACE TO 220 PSI - PUMPING 135 BBLS 11.6# BRINE TO ATTEMPT SECOND KILL PUMPING 3.8 BPM DOWN BACKSIDE @ 3000 PSI 11:43 WELL NOT BLEEDING DOWN PROPERLY - ATTEMPT TO TRICKLE TO TANK TO BLEED DOWN PRESSURE - BLED ABOUT 1 BBL BACK- TUBING PRESSURED BACK TO 400 PSI 13:00 SHUTING IN SUPPORTING INJECTORS - - WAITING ON WELL TO DIE 15:30 WELL DEAD AND STABLE - START PULLING SPENT GUNS/FIRING HEAD AND DEPLOYMENT BAR, FILLING HOLE EVERY 5 GUNS W/1 BBL TOTAL 16:05 OOH W/GUNS. ALL SHOTS FIRED. MAKE UP 2ND RUN, 360' OF SHOTS FROM 9850'-9489' 17:00 ALL GUNS MADE UP - CLOSE SLIPS/PIPES AND RIG OFF CRANE AND RIG UP INJECTOR HEAD 18:00 DISPLACE COIL VOLUME OF DIESEL TO TANKS USING 11.6 BRINE 18:59 RIH W/RUN # 2 (9850'-9489') - 360' North Slope Alaska Alaska State Plane 4 Kuparuk 1R 1R-OIA Surveyed: 12 December, 1999 ORIGINAL SURVEY REPORT 5 January, 2000 · ~ Your Ref: API-500292140401 Surface Coordinates: 5991050.09 N, 539829.76 E (70° 23' 11.3705" N, 149° 40' 33.8084". W) Kelly Bushing: 79.90ft above Mean Sea Level DRILLING SERVICES RECEIVED J~,~i'.! 0 6 200g Alaska Oil & Gas Cons. Commi~ Survey Ref: svy8961 A itA~I~IilIJR'I'~I~ COt,~,~,Ab~' Sperry-Sun Drilling Services Survey Report for 1R-OIA Your Ref: API-500292140401 Surveyed: 12 December, 1999 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 6397,90 43.800 105.630 5176.35 5256.25 6490.64 45.300 104.500 5242.44 5322.34 6518.44 44.480 103,000 5262.14 5342.04 6549.99 42.060 99.000 5285.11 5365.01 6642.90 37.380 88.000 5356.65 5436.55 6708.55 34.640 76.450 5409.81 5489.71 6740.66 33.210 65.640 5436.48 5516.38 6773.93 31.730 51.930 5464.58 5544.48 6807.28 30.580 45.080 5493.13 5573.03 6840.02 26.810 48.570 5521.85 5601.75 6870.09 23.490 59.500 5549.08 5628.98 6902.23 19,700 65.090 5578.96 5658.86 6932.60 15,810 67.920 5607.88 5687.78 6963.49 13.670 75.160 5637.75 5717.65 6996.74 13.540 87.610 5670.08 5749.98 7027.08 14.090 96.720 5699.54 5779.44 7059.33 15.010 112.020 5730.77 5810.67 7089.01 17,780 124.160 5759.25 5839.15 7124.53 19,970 133.440 5792.86 5872.76 7154.69 21.080 144.500 5821.12 5901.02 7187.16 23.260 143.500 5851.19 5931.09 7218.60 24.230 149.030 5879.97 5959.87 7251.49 26.070 154.220 5909.74 5989.64 7282.50 27.110 161.980 5937.48 6017.38 7315.58 27.180 167.720 5966.92 6046.82 Local Coordinates Northings Eastings (ft) (ft) 920.32 S 2699.91 E 937.22 S 2762.73 E 941.89 S 2781.79 E 946.03 S 2803.00 E 949.92 S 2862.03 E 944.84 S 2900.14 E 939.07 S 2917.04 E 929.91 S 2932.25 E 918.51 S 2945.16 E 907.74 S 2956.60 E 900.20 S 2966.86 E 894.66 S 2977.29 E 890.95 S 2985.77 E 888.44 S 2993.20 E 887.27 S 3000.89 E 887.55 S 3008.11 E 889.58 S 3015.88 E 893.56 S 3023.20 E 900.78 S 3032.09 E 908.74 S 3038.99 E 918.65 S 3046.19 E 929.17 S 3053.20 E 941.47 S 3059.82 E 954.33 S 3064.97 E 968.88 S 3068.91 E Global Coordinates Dogleg Northings Eastings Rate (fi) (ft) (°/100fi) Alaska State Plane 4 Kuparuk 1R Vertical Section (ft) 5990144.16 N 542534.53 E 190.17 5990127.60 N 542597.45 E 1.829 190.24 5990123.03 N 542616.53 E 4.817 189.81 5990119.00 N 542637.76 E 11.588 188.32 5990115.43 N 542696.81 E 9.074 176.80 5990120.70 N 542734.89 E 11.137 162.04 5990126.57 N 542751.76 E 19.287 152.09 5990135.81 N 542766.92 E 22.524 139.30 5990147.28 N 542779.77 E 11.166 124.94 5990158.11 N 542791.15 E 12.597 111.58 5990165.70 N 542801.37 E 18.946 101.65 5990171.29 N 542811.78 E 13.405 93.60 5990175.05 N 542820.24 E 13,116 87.82 5990177.61 N 542827.65 E 9.128 83.46 5990178.82 N 542835.34 E 8.800 80.35 5990178.57 N 542842.55 E 7.387 78.75 5990176.59 N 542850.34 E 12.217 78.70 5990172.64 N 542857.68 E 14.799 80.65 5990165.47 N 542866.61 E 10.444 85.33 5990157.55 N 542873.54 E 13.353 91.23 5990147.68 N 542880.80 E 6.814 98.94 5990137.19 N 542887.87 E 7.722 107.29 5990124.93 N 542894.55 E 8.729 117.45 5990112.10 N 542899.77 E 11.684 128.54 5990097.56 N 542903.79 E 7.917 141.58 RECEIVED 06 2000 Comment Tie-on Survey Window Point Continued... 5 January, 2000 - 15:54 -2- ~aOil&Gas Cons. Com~ Am~ho~ DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for 1R-OIA Your Ref: AP1-500292140401 Surveyed:. 12 December, 1999 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 7346.71 26.880 170.730 5994.65 6074.55 7380.46 26.990 163.200 6024.75 6104.65 7413.76 26.870 162.870 6054.44 6134.34 7446.11 27.890 156.020 6083.17 6163.07 7476.26 28.980 149.780 6109.69 6189.59 7508,45 29,830 149,140 6137.73 6217.63 7540.50 30.760 154,330 6165.41 6245,31 7572.51 31.830 156,460 6192.77 6272.67 7606.74 31.950 159.740 6221.83 6301.73 7638.31 32.680 164.760 6248,52 6328.42 7675.05 34.040 169.140 6279.21 6359.11 7698.70 37.360 169.620 6298.41 6378.31 7730.66 40.500 175.560 6323,28 6403.18 7763.83 43.920 174.100 6347.84 6427.74 7793.66 47.270 180.890 6368.73 6448.63 7826.19 49.180 178.520 6390.40 6470.30 7859.89 52.160 183.510 6411.76 6491.66 7895.69 54.450 186.590 6433.16 6513.06 7923.46 58.560 182.150 6448.48 6528.38 7956.90 61.480 181.740 6465.19 6545.09 7989.19 63.750 181.180 6480.04 6559.94 8021.95 66.570 181.400 6493.80 6573.70 8049.74 71.090 177,200 6503.84 6583.74 8078.56 74.050 179.160 6512.47 6592.37 8111.42 77.640 178.520 6520.51 6600.41 982.78 S 3071.56 E 997.64 S 3075.00 E 1012.07 S 3079.40 E 1025.97 S 3084.63 E 1038.73 S 3091.18 E 1052.34 S 3099.21 E 1066.57 S 3106.85 E 1081.69 S 3113.77 E 1098.46 S 3120.51 E 1114.53 S 3125.64 E 1134.20 S 3130.19 E 1147.76 S 3132.73 E 1167.66 S 3135.28 E 1189.85 S 3137.30 E 1211.11 S 3138.19 E 1235.37 S 3138.32 E 1261.41 S 3137.84 E 1290.00 S 3135.30 E 1313.08 S 3133.56 E 1342.02 S 3132.58 E 1370.68 S 3131.85 1400.40 S 3131.18 1426.30 S 3131.51 1453.78 S 3132.38 1485.63 S 3133.02 Global Coordinates Dogleg Northings Eastings Rate (fi) (ft) (°/lOOft) 5990083.69 N 542906.51 E 4.498 5990068.84 N 542910.03 E 10.106 5990054.44 N 542914.51E 0.576 5990040.56 N 542919.81 E 10.230 5990027.84 N 542926.42 E 10.492 5990014.27 N 542934.53 E 2.815 5990000.08 N 542942.24 E 8.666 5989985.00 N 542949.24 E 4.808 5989968.26 N 542956.07 E 5.074 5989952.23 N 542961.29 E 8.807 5989932.58 N 542965.94 E 7.527 5989919,03 N 542968.56 E 14.088 5989899.15 N 542971.21 E 15.253 5989876.97 N 542973.35 E 10.726 5989855.71 N 542974.36 E 19.751 5989831.45 N 542974.62 E 7.999 5989805.41 N 542974.27 E 14.466 5989776.81 N 542971.89 E 9.407 5989753.72 N 542970.27 E 19.915 5989724.77 N 542969.44 E 8.796 E 5989696.11 N 542968.86 E 7.197 E 5989666.39 N 542968.35 E 8.630 E 5989640.49 N 542968.82 E 21.518 E 5989613.02 N 542969.84 E 12.148 E 5989581.17 N 542970.65 E 11.087 RECEIVED , 0 6 5 January, 2000 - 15:54 Alaska State Plane 4 Kuparuk 1R Vertical Section (ft) Comment 154.31 167.78 180.57 192.65 203.28 214.35 226.12 238.93 253.39 267.57 285.40 297.84 316,40 337.31 357.62 381.02 406.30 434.57 457.31 485.52 513.40 542.27 567.20 593.52 624.12 Continued... DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for 1R-OIA Your Ref: API.500292140401 Surveyed: 12 December, 1999 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 8145.27 81.810 179.120 6526.55 6606.45 8179.27 84.800 177.510 6530.51 6610.41 8209.78 84.620 178.290 6533.32 6613.22 8241.84 84.200 177.780 6536.44 6616.34 8280.43 80.570 175.640 6541.56 6621.46 8305.83 78.260 176.540 6546.22 6626.12 8337.79 75.950 175.990 6553.36 6633.26 8371.72 74.680 177.130 6561.96 6641.86 8404.00 74.700 176.240 6570.48 6650.38 8434.78 76.210 176.440 6578.21 6658.11 8467.82 78.630 177.020 6585.41 6665.31 8496.07 81.450 177.230 6590.29 6670.19 8528.51 83.090 179.580 6594.66 6674.56 8561.48 80.390 179.630 6599.39 6679.29 8593.19 78.290 181.040 6605.26 6685.16 8625.90 78.540 180.510 6611.83 6691.73 8658.58 79.040 181.670 6618.18 6698.08 8691.04 81.870 183.080 6623.56 6703.46 8722.66 84.660 187.000 6627.27 6707.17 8755.23 87.000 187.680 6629.64 6709.54 8788.52 89.010 190.460 6630.80 6710.70 8820.76 91.570 192.970 6630.64 6710.54 8854.45 94.100 194.890 6628.97 6708.87 8882.89 92.510 194.560 6627.33 6707.23 8912.01 90.590 194.710 6626.54 6706.44 1518.92 S 3133.71E 1552.67 S 3134.70 E 1583.03 S 3135.82 E 1614.92 S 3136.91 E 1653.09 S 3139.10 E 1678.00 S 3140.81 E 1709.09 S 3142.83 E 1741.85 S 3144.80 E 1772.93 S 3146.60 E 1802.66 S 3148.51E 1834.85 S 3150.34 E 1862.64 S 3151.74 E 1894.77 S 3152.63 E 1927.39 S 3152.86 E 1958.55 S 3152.68 E 1990.59 S 3152.24 E 2022.64 S 3151.63 E 2054.62 S 3150.31E 2085.89 S 3147.55 E 2118.11 S 3143.40 E 2150.96 S 3138.15 E 2182.52 S 3131.61E 2215.18 S 3123.51E 2242.64 S 3116.29 E 2270.80 S 3108.94 E 5989547.88 N 542971.51E 5989514.14 N 542972.69 E 5989483.79 N 542973.96 E 5989451.90 N 542975.23 E 5989413.74 N 542977.62 E 5989388.84 N 542979.46 E 5989357.76 N 542981.65 E 5989325.01 N 542983.80 E 5989293.94 N 542985.76 E 5989264.22 N 542987.82 E 5989232.04 N 542989.83 E 5989204.26 N 542991.38 E 5989172.14 N 542992.44 E 5989139.51N 542992.84 E 5989108.35 N 542992.82 E 5989076.31 N 542992.56 E 5989044.26 N 542992.12 E 5989012.27 N 542990.96 E 5988980.99 N 542988.37 E 5988948.75 N 542984.39 E 5988915.87 N 542979.32 E 5988884.28 N 542972.95 E 5988851.58 N 542965.02 E 5988824.08 N 542957.95 E 5988795.88 N 542950.75 E RECEIVED Dogleg Rate (°/lOOft) 12.442 9.972 2.613 2.055 10.894 9.739 7.420 4.957 2.660 4.946 7.522 10.009 8.780 8.191 7.934 1.762 3.803 9.714 15.146 7.480 10.301 11.120 9.423 5.709 6.613 Alaska State Plane 4 Kuparuk 1R Vertical Section (ft) Comment 656.10 688.44 717.48 748.00 784.31 807.93 837.43 868.56 898.12 926.35 956.96 983.44 1014.25 1045.70 1075.85 1106.91 1138.02 1169.26 1200.17 1232.37 1265.45 1297.63 1331.27 1359.66 1388.77 Continued... 5 January, 2000- 15:54 -4- ~ C~ a GI~ COils. Co~O~ DrillQueSt 1.05.04e Sperry-Sun Drilling Services Survey Report for 1R-OIA Your Ref: API-500292140401 Surveyed: 12 December, 1999 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (fi) (ft) (ft) 8949.31 88.980 195.010 6626.68 6706.58 8977.40 88.510 193.770 6627.30 6707.20 9009,26 88.780 193.350 6628.05 6707.95 9040.14 88.980 192.300 6628.65 6708.55 9072.75 88.810 194.490 6629.28 6709.18 9104.34 87.350 192.730 6630.34 6710.24 9136.67 87.380 193.330 6631.83 6711.73 9168.63 87.290 194.420 6633.31 6713.21 9200.01 86.450 197.140 6635.03 6714.93 9231.94 86.340 195.990 6637.04 6716.94 9263.23 87.250 197.420 6638.79 6718.69 9294.99 89.510 195.260 6639.68 6719.58 9328.52 91.260 196.400 6639.46 6719.36 9358.79 91.790 195.310 6638.65 6718.55 9395.26 91.360 191.090 6637.65 6717.55 9424.84 91.230 191.710 6636.98 6716.88 9455.95 90.770 191.200 6636.44 6716.34 9486.45 89.480 193.300 6636.37 6716.27 9520.02 88.340 191.310 6637.01 6716.91 9551.67 88.550 191.490 6637.87 6717.77 9587.02 88.580 192.880 6638.75 6718.65 9617.13 89.320 194.540 6639.31 6719.21 9649.18 90.250 196.250 6639.43 6719.33 9681.81 90.550 196.450 6639.20 6719.10 9714.80 91.140 196.730 6638.71 6718.61 2306.85 S 3099.37 E 2334.05 S 3092.39 E 2365.02 S 3084.92 E 2395.12 S 3078.07 E 2426.83 S 3070.52 E 2457.52 S 3063.09 E 2488.98 S 3055.81 E 2519.97 S 3048.15 E 2550.12 S 3039.63 E 2580.67 S 3030.55 E 2610.59 S 3021.57 E 2641.05 S 3012.64 E 2673.31 S 3003.49 E 2702.41 S 2995.22 E 2737.90 S 2986.90 E 2766.89 S 2981.06 E 2797.37 S 2974.88 E 2827.18 S 2968.41 E 2859.97 S 2961.26 E 2890.98 S 2955.00 E 2925.52 S 2947.54 E 2954.77 S 2940.41 E 2985.67 S 2931.90 E 3016.98 S 2922.71 E 3048.59 S 2913.30 E 5 January, 2000- 15:54 -5- Global Coordinates Dogleg Northings Eastings Rate (fi) (fi) (°/lOOff) 5988759.78 N 542941.37 E 4.391 5988732.54 N 542934.54 E 4.720 5988701.54 N 542927.24 E 1.567 5988671.40 N 542920.54 E 3.461 5988639.64 N 542913.16 E 6.735 5988608.92 N 542905.89 E 7.236 5988577.42 N 542898.78 E 1.856 5988546.38 N 542891.29 E 3.418 5988516.19 N 542882.93 E 9.059 5988485.60 N 542874.01 E 3.611 5988455.63 N 542865.19 E 5.411 5988425.12 N 542856.42 E 9.841 5988392.82 N 542847.45 E 6.229 5988363.67 N 542839.33 E 4.003 5988328.14 N 542831.20 E 11.627 5988299.12 N 542825.51E 2.141 5988268.60 N 542819.49 E 2.207 5988238.76 N 542813.18 E 8.080 5988205.93 N 542806.20 E 6.831 5988174.89 N 542800.12 E 0.874 5988140.31 N 542792.84 E 3.932 5988111.02 N 542785.86 E 6.035 5988080.08 N 542777.52 E 6.073 5988048.72 N 542768.50 E 1.105 5988017.06 N 542759.25 E 1.980 RECEIVED Alaska State Plane 4 Kuparuk 1R Vertical Section (ft) Comment 1426.07 1454.15 1485.99 1516.84 1549.43 1580.99 1613.27 1645.19 1676.52 1708.37 1739.60 1771.33 1804.86 1835.11 1871.54 1901.05 1932.10 1962.56 1996.09 2027.66 2062.96 2093.05 2125.10 2157.72 2190.70 Continued... DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for 1R-OIA Your Ref: AP1-500292140401 Surveyed: 12 December, 1999 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (fi) (ft) (fi) (ft) 9745.55 92.220 196.970 6637.81 6717.71 9781.23 92.090 196.460 6636.47 6716.37 9809.41 92.120 196.810 6635.43 6715.33 9841.14 94.010 197.300 6633.74 6713.64 9872.44 94.650 198.070 6631.37 6711.27 9904.82 93.080 196,740 6629.19 6709.09 9938.26 92.220 196.340 6627.65 6707.55 9970.78 94.190 195.630 6625.83 6705.73 10002.97 93.980 194.870 6623.53 6703.43 10036.86 93.170 194.550 6621.42 6701.32 10064.21 92.220 193.560 6620.13 6700.03 10096.53 90.860 194.090 6619.27 6699.17 10129.31 91.310 193.420 6618.65 6698.55 10160.96 91.360 195.240 6617.91 6697.81 10225.60 89.570 194.800 6617.38 6697.28 10257.01 89.910 193,800 6617.53 6697.43 10289.06 90.060 192.770 6617.53 6697.43 10322,05 89.820 192.060 6617.57 6697.47 10353.64 89.130 192.270 6617.86 6697.76 10384.43 89.200 193.600 6618.31 6698.21 10417.95 88.890 192.960 6618.87 6698.77 10449.71 88.800 192.680 6619.51 6699.41 10480.17 87.570 193.840 6620.47 6700.37 10513.39 87.320 193.950 6621.95 6701.85 10546.38 86.860 194.400 6623.63 6703.53 3078.01 S 2904.39 E 3112.16 S 2894.13 E 3139.14 S 2886.07 E 3169.43 $ 2876.78 E 3199.16 S 2867.30 E 3229.99 S ' 2857.63 E 3262.01S 2848.13 E 3293.22 S 2839.18 E 3324.20 S 2830.74 E 3356.91 S 2822.15 E 3383.42 S 2815.52 E 3414.79 S 2807.80 E 3446.62 S 2800.00 E 3477.28 S 2792.17 E 3539.70 S 2775.42 E 3570.14 S 2767.66 E 3601.33 S 2760.30 E 3633.55 S 2753.21 E 3664.43 S 2746.55 E 3694.43 S 2739.66 E 3727.05 S 2731.96 E 3758.01 S 2724.91 E 3787.65 S 2717.93 E 3819.86 S 2709.96 E 3851.81 S 2701.89 E 5987987.59 N 542750.50 E 5987953.39 N 542740.43 E 5987926.37 N 542732.51E 5987896.03 N, 542723,38 E 5987866.24 N 542714.05 E 5987835.37 N 542704,56 E 5987803,29 N 542695.22 E 5987772.04 N 542686.44 E 5987741.01N 542678.16 E 5987708.25 N 542669.75 E 5987681,72 N 542663.25 E 5987650.31 N 542655.70 E 5987618.43 N 542648.08 E 5987587.73 N 542640.41 E 5987525.22 N 542623.99 E 5987494.74 N 542616.40 E 5987463.51 N 542609.20 E 5987431.25 N 542602.28 E 5987400,34 N 542595.79 E 5987370.30 N 542589.05 E 5987337.64 N 542581.53 E 5987306.64 N 542574.65 E 5987276.97 N 542567,82 E 5987244.71 N 542560.03 E 5987212.73 N 542552.13 E RECEIVED 2000 Dogleg Rate (°/100ft) 3.598 1.474 1,246 6.153 3.193 6.348 2,836 6.438 2.444 2.569 5.014 4.516 2.462 5.751 2.852 3,363 3.248 2.272 2.283 4.325 2.121 0.926 5.549 0.822 1.949 Alaska State Plane 4 Kuparuk 1R Vertical Section (ft) Comment 2221.42 2257.05 2285.20 2316.87 2348.04 2380.32 2413.71 2446.17 2478.28 2512.10 2539.42 2571.72 26O4.49 2636.12 2700,76 2732.17 2764.20 2797.16 2828.71 2859.47 2892.97 2924.70 2955.13 2988.31 3021.26 Continued... 5 Januar~ 2000-15:54 -6- ,qadaOil & Gas Cons. Commimion - q~hnr ~ DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for 1R-OIA Your Ref: API-500292140401 Surveyed: 12 December, 1999 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (it) 10577.19 87,230 194.830 6625.21 6705.11 10610.92 87,260 194.480 6626.84 6706.74 10642.80 88,620 195.280 6627.98 6707.88 10672.94 89,050 195,670 6628.59 6708.49 10708.14 89.660 195.440 6628.99 6708.89 10739.38 91.350 195.510 6628.72 6708.62 10769.18 93.200 195.110 6627.53 6707.43 10802.70 93.720 195.370 6625.51 6705.41 10834.64 94.000 195.610 6623.36 6703.26 10864.04 94.150 195.810 6621.27 6701.17 10898.47 94.470 196,190 6618.68 6698.58 10930.62 94.590 195.830 6616.14 6696.04 10960.84 94.900 195.480 6613.64 6693.54 10994.87 95,430 195.860 6610.58 6690.48 11026.70 96.410 196.220 6607.30 6687.20 11053.09 96,970 196,400 6604.22 6684~2 11083.04 97.310 196.150 6600.50 6680.40 11117.30 97.810 196,590 6595.99 6675.89 11148.16 97.910 196.180 6591.77 6671.67 11186.91 98.060 196.910 6586.39 6666.29 11214.67 96.450 198.170 6582.88 6662.78 11249.15 94.460 199.070 6579.61 6659.51 11277.52 94.560 199.470 6577.38 6657.28 11316.27 94,680 199.230 6574.25 6654,15 11346.16 94,130 199.910 6571.96 6651.86 3881.58 S 2694.13 E 3914.17 S 2685.61E 3944.96 S 2677.42 E 3974.01 S 2669.38 E 4007.91S 2659.94 E 4038.02 S 2651.61 E 4066.74 S 2643.75 E 4099.02 S 2634.95 E 4129.73 S 2626.44 E 4157.96 S 2618.50 E 4190.96 S 2609.04 E 4221.77 S 2600.20 E 4250.77 S 2592.07 E 4283.40 S 2582.92 E 4313.83 S 2574.17 E 4338.98 S 2566.81E 4367.51 S 2558.48 E 4400.10 S 2548.91E 4429.42 S 2540.29 E 4466.21S 2529.36 E 4492,46 S 2521.06 E 4524.99 S 2510.10 E 4551.69 S 2500.77 E 4588.13 S 2487.97 E 4616.21S 2477.99 E Global Coordinates Dogleg Northings Eastings Rate (fi) (ft) (°/100ft) 5987182.91N 542544.52 E 5987150.27 N 542536.17 E 5987119.44 N 542528,16 E 5987090.36 N 542520.27 E 5987056.40 N 542511.01E 5987026.25 N 542502.84 E 5986997.49 N 542495.13 E 5986965.16 N 542486.51E 5986934.41N 542478.16 E 5986906.13 N 542470.37 E 5986873.08 N 542461.08 E 5986842.23 N 542452.41 E 5986813.19 N 542444.43 E 5986780.51 N 542435.45 E 5986750.03 N 542426.87 E 5986724.84 N 542419.64 E 5986696.27 N 542411.47 E 5986663.63 N 542402.07 E 5986634.26 N 542393.60 E 5986597.42 N 542382.87 E 5986571.12 N 542374.71 E 5986538.53 N 542363.92 E 5986511.79 N 542354.73 E 5986475.28 N 542342.13 E 5986447.14 N 542332.30 E RECEIVED 1.840 1.040 4.948 1.926 1.852 5.414 6.351 1.734 1.153 0.849 1.441 1.177 1.544 1.914 3.278 2.228 1.405 1.937 1.355 1,905 7.342 6.329 1.449 0.691 2.921 Alaska State Plane 4 Kuparuk 1R Vertical Section (ft) Comment 3052.03 3085.72 3117.57 3147.71 3182.90 3214.14 3243.91 3277.37 3309.24 3338.56 3372.89 3404.93 3435.05 3468.94 3500.59 3526.80 3556.51 3590,46 3621.02 3659.38 3686.89 3721.14 3749.35 3787.86 3817.57 Contmued... DrillQuest 1.05.04e 5 January, 2000- 15:54 - 7- Sperry-Sun Drilling Services Survey Report for 1R-OIA Your Ref: API-500292140401 Surveyed: 12 December, 1999 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 11382.69 93.480 200.200 6569.53 6649.43 11414.11 92.430 200.260 6567.91 6647.81 11445.96 92.090 199.950 6566.66 6646.56 11477.95 90.090 200.630 6566.05 6645.95 11508.63 88,920 200.590 6566.32 6646.22 11543.77 86.490 200.240 6567.72 6647.62 11571.86 84.510 201.010 6569.93 6649.83 11604.51 82.630 201.340 6573.58 6653.48 11636.40 84.300 201.520 6577.21 6657.11 11668.02 86.400 201.620 6579.77 6659.67 11701.22 86.890 201,420 6581.72 6661.62 11735.59 86.960 200,910 6583.56 6663,46 11766.45 87.170 200.650 6585.14 6665,04 11800.37 87.350 200.730 6586.76 6666,66 11833.42 87.820 200.920 6588.16 6668,06 11858.00 88.490 201.290 6588.95 6668.85 11891.61 89.260 200.790 6589.61 6669.51 11914.58 89.350 200.560 6589.89 6669.79 11955.09 89.450 200.080 6590.31 6670.21 11988.31 87.480 198.880 6591.20 6671.10 12019.89 87.410 198.710 6592.61 6672.51 12051,12 87.970 198.460 6593.87 6673.77 12084,61 88.250 198.810 6594.97 6674.87 12108,59 88.430 198.850 6595.67 6675.57 12171.00 88,430 198.850 6597.38 6677.28 4650.45 S 2465.49 E 4679.89 S 2454.64 E 4709.78 S 2443.70 E 4739.77 S 2432.61 E 4768.49 S 2421.81E 4801.39 S 2409.56 £ 4827.60 S 2399.70 E 4857.85 S 2387.98 E 4887.34 S 2376.40 E 4916.65 S 2364.82 E 4947.48 S 2352.66 E 4979.49 S 2340.27 E 5008.30 S 2329.33 E 5040.00 S 2317.36 E 5070.86 S 2305.62 E 5093.78 S 2296.78 E 5125.15 S 2284.71E 5146.63 S 2276.61 E 5184.62 S 2262.54 E 5215.93 S 2251.46 E 5245.79 S 2241.30 E 5275.37 S 2231.36 E 5307.09 S 2220.66 E 5329.77 S 2212.92 E 5388.81 S 2192.77 E Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/lOOft) 5986412,84 N 542319.98 E 1.948 5986383.34 N 542309.29 E 3.347 5986353.39 N 542298.51 E 1.444 5986323.34 N 542287.58 E 6.603 5986294.57 N 542276.93 E 3.816 5986261.60 N 542264.86 E 6.986 5986235.34 N 542255.13 E 7.560 5986205.02 N 542243.58 E 5.845 5986175.47 N 542232.16 E 5.267 5986146.10 N 542220.73 E 6.649 5986115.21N 542208.74 E 1.594 5986083,14 N 542196.52 E 1.496 5986054,26 N 542185.73 E 1,082 5986022.50 N 542173.93 E 0,581 5985991.58 N 542162.36 E 1,534 5985968.61N 542153,63 E 3.113 5985937.19 N 542141,74 E 2.731 5985915.65 N 542133.74 E 1.075 5985877.59 N 542119.88 E 1.210 5985846.23 N 542108.97 E 6.943 5985816.31 N 542098.97 E 0.582 5985786.68 N 542089.18 E 1.963 5985754.91 N 542078.65 E 1.338 5985732.18 N 542071.04 E 0.769 '"" 0 6 ?.000 Oll&G C s.C,m mion Alaska State Plane 4 Kuparuk 1R Vertical Section (ft) Comment 3853.87 3885.12 3916.82 3948.67 3979.20 4014.15 4042.02 4074.27 4105.75 4137.06 4169,99 4204,11 4234.77 4268.49 4301.34 4325.77 4359.18 4382.04 4422.37 4455.48 4486.96 4518.10 4551.50 4575.42 4637.67 Projected Survey Continued... DrillQuest 1.05. 04e 5 January, 2000-15:54 -8- Sperry-Sun Drilling Services Survey Report for 1R-OIA Your Ref: API-500292140401 Surveyed: 12 December, 1999 North Slope Alaska Alaska State Plane 4 Kuparuk 1R All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Wellhead. Northings and Eastings are relative to Wellhead. Magnetic Declination at Surface is 26.735° (26-Nov-99) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Wellhead and calculated along an Azimuth of 195.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12171.00ft., The Bottom Hole Displacement is 5817.86ft., in the Direction of 157.858° (True). Comments Measured Stati o n ' Coord i nates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) ~ 6397.90 5256.25 920.32 S 2699.91 E Tie-on Survey 6490.64 5322.34 937.22 S 2762.73 E Window Point 12171.00 6677.28 5388.81 S 2192.77 E Projected Survey 5 January, 2000 - 15:54 - 9 - DrillQuest 1.05.04e 2~29~00 Iqq.oqc/ Schlumberger NO. 121231 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Kuparuk Color Well Job # Log Description Date BL Sepia Print 1 R-01A 20076 SC MT 2/6/00 1 1 R-22A 20075 SCMT 2/5/00 1 3F-20 20086 SCMT 2/13/00 I .... t MAR 1 4 2000 SIGNED: DATE: ' Alaska Oil & Gas Co:~s. co[mimi$$ior~ Anchorage Please sign and return one this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you. WELL LOG TRANSMYrTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft T~lor 3001 Porcupine Dr. Anchor~e, Alaska 99501 February 15, 2000 MWD Formation Evaluation Logs 1R-01& AK-MM-90198 The technical data listed below is being submitted herewitk Please address any problems or concems to the attention of.' Jim Gal~ Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 !R-O1A: 2" x 5" MD ResistM~, & Craw-ma Ray, Logs: 50-029-21404-01 2"x 5" TVD Resistiviw & Gamma Ray Logs: 50-029-21404-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia · RECE'IVED FEB i6 000 .Alaska Oil & Gas Cons, Commission Anchorage 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax' 907-273-3535 A Halliburton Company Schlumberger NO. 121137 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Kuparuk Color Well Job # Log Description Date BL Sepia Print 1 L-26 20054 SCMT 000118 1 2N-345 20053 SCMT 000117 1 1R-01A JEWELRY LOG W/PSP & SCMT 000108 I 1 2M-18 ~,k\ (- LEAK DETECTION LOG 000105 I 1 1D-111 LI.~ C. INJECTION PROFILE W/PSP 000104 1 1 1D-114 INJECTION PROFILE W/PSP 000104 1 1 1 D-122 INJECTION PROFILE 000106 I 1 1D-128 INJECTION PROFILE 000106 I 1 1 D-130 ,~ ~,' iNJECTION PROFILE 000107 I I SIG DATE: o Alask~ 0il & Ge~ Cons. Commission  _Anc~0rage Please sign and return one opy of this transmit Sherrie at the above address or fax to (907) 561~317. ~nanK you. 1/27/00 Scblmberger NO. 121121 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Kuparuk Color Well Job # Log Description Date BL Sepia Print CD ~'L-03A 20011 SCMT 991126 1 1 L-28 20009 SCMT 991219 1 1 R-01A 20013 SCMT 000108 1 2N-343 /~ I (_. 99350 !EST ~ C~ L~ C~ ~ 990827 1 1 1 ~ .P. [ L ~ ! V i- 13 SIGN ED.~O'~~ DATE: Please sign and return one ¢op¥ o! this transmittal to Sherrie at the above address or fax to {00'/) 551-8317. Thank you. FEB 04 2OOO Anchorage 1/25/00 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs 1R-01A, January 13, 2000 AK-MM-90198 1 LDWG formatted Disc with verification listing. API#: 50-029-21404-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING ANII RETURNING THE ATTACHED COPY OF ~ TRANSMITTAL LETII~R TO THE ATr~CrlO~ Olr:~. Sperry-Sun Drilling Service Attn: Jim Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECEIVED 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535 A Halliburton Company 05-Jan-00 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Wel 1R-01A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey Projected Survey: 6,397.90' MD 6,490.64' MD 12,171.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, ~'AN 06 /iladmOil & Gas Ceos. Com~ William T. Allen Survey Manager Attachment(s) MEMORANDUM TO: Robert Christenson Chairman State of Alaska Alaska Oil and Gas Conservation Commission ,¢A~ DATE: December 15, 1999 THRU' Blair Wondzell, P. I. Supervisor FROM' Chuck ScheveY"~~ SUBJECT: Petroleum Inspector BOPE Test Nabors 16E KRU 1R-01A PTD # 198-237 Wednesday, December t5, 1999' I traveled to Arco's KRU 1R-01A well being drilled by Nabors Rig 16E (previously Pool 6) and witnessed the weekly BOPE test. As the attached AOGCC BOPE test report indicates, the test lasted 3.5 hours with no failures. The recent purchase of Pool Drilling by Nabors appears to have had no adverse affect as the rig crews remained unchanged and seemed to be in good spirits. The rig was clean and all related equipment appeared to be in good working order. The location was well organized allowing good access to the rig. Summary: I witnessed the weekly BOPE test on Nabors Rig 16E drilling Arco's 1R-01A Well. Nabors 16, 12/15/99, Test time 3.5 hours, no failures Attachment: BOP Nabors 16E 12-15-99 CS X Unclassified Confidential (Unclassified if doc. removed ) Confidential STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: DATE: Ddg Contractor: Nabors Rig No, 16E PTD # 198-237 Rig Ph.# Operator: ARCO Rep,: Well Name: 1 R-01A Rig Rep.: Casing Size: Set ~ Location: Sec. Test: Initial Weekly X Other 12/15/99 659/7562 Fred Herbert Jimmy Greco 20 T. 12N R. 10E Meridian UM MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES Well Sign OK Drl. Rig OK Hazard Sec. OK. BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln, Valves HCR Valves Kill Line Valves Check Valve Quan. 1 Test Press. P/F 250/3500 ~ I 250/3500 1 250/3500 1 250/3500 1 250/3500 2 25~3500 1 250/3500 N/A MUD SYSTEM: Visual Alarm Trip Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Meth Gas Detector OK OK, H2S Gas Detector OK OK ' FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP Test Quan. Pressure P/F 1 250/3500 P 1 25O/35OO P 1 250/3500 p 1 250/3500 P CHOKE MANIFOLD: No. Valves 15 No. Flanges 30 Manual Chokes 1 Hydraulic Chokes 2 Test Pressure P/F 25O/5OOO P 250/5000I P Functioned P Functoned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 29OO 1500 minutes 25 sec. 2 minutes 30 sec. OK Remote: OK 6 @ 2OOO Psi Psig. Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested 23 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Wdtten or Faxed verification to theAOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Distribution: orig-Well File c - Oper./Rig c - Database c - Trip Rpt File c ~2~L -Inspe or STATE WITNESS REQUIRED? YES X NO YES 24 HOUR NOTICE GIVEN X NO Waived By: Witnessed By: Chuck Scheve 16E 12-15-99 CS MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission Robert Christenson,~.)~~? DATE' November 25, 1999 Chairman THRU' Blair Wondzell, P. I. Supervisor FROM' John Crisp,~r~. SUBJECT: Petroleum Irfspector FILE NO' Rig Insp. Pool 6 jc. DOC Gas Detector Calibrations Kuparuk River Unit Redrill 1R-0 lA PTD 198-237 November 25,1999' I traveled to Pool 6 in the Kuparuk River Field for initial BOPE test on 1R-01A. This is the first Decompletion for Pool 6 in the Kuparuk River Field. The timing for the BOPE test was uncertain @ the time of my arrival. A BPV was set in the tbg. hanger that was seeping freeze protection diesel. The Drilling Foreman was going to circulate out diesel & seawater & reinstall BPV before ND tree & NU BOPEs. I conducted Rig inspection & witnessed calibration of H2S & methane gas detectors. I waived witnessing BOP test. SUMMARY: I conducted Rig inspection on Pool 6 in KRU & witnessed calibration & testing of 3 methane & 4 H2S gas detectors KRU 1R-01A. Attachments: None. cc; NON-CONFIDENTIAL Rig inspection Pool 6? Subject: Rig inspection Pool 6? Date: Fri, 26 Nov 1999 08:38:42 -0900 From: John Crisp <john_crisp@admin. state.ak.us> Internal Organization: State of Alaska, Dept ofAdmin, AOGCC To: Blair E Wondzell <blair wondzell@admin.state.ak.us> Morning Mr. Blair, Looks like Nabors finally took over Pools Rigs in Alaska. The personell manager for Nabors came to 6 11-24 & told the hands. The Toolpusher said his Rig would be Nabors 16e. I do not know if this Rig change is official or how it will affect us. JC. i Name: Rig inspection Pool 6 11-25-99jc.doc ~Rig inspection Pool 6 11-25-99jc.doci Type: Microsoft Word Document !Encoding: base64 1 of 1 11/26/99 10:04 AM TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Graham Alvord Drilling Engineering Supervisor ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Re~ Kuparuk River Unit l R-01A ARCO Alaska. Inc. Permit No: 198-237 Sur Loc: 154'FNL, 139'FWL, SEC. 20, T12N. R10E. UM Btmhole Loc. 137'FNL, 2313'FWL, SEC. 29. T12N. RIOE. UM Dear Mr. Alvord: Enclosed is the approved application for permit to redrill thc above referenced xvell. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given bv contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sinc~e~ ~ / Robert N. Chr' enson. P. E. Chairman BY ORDER OF TH_~OMMISSION DATED this [ ~ ~ day of November, 1999. dlf:Enclosures cc: Department of Fish & Game. Habitat Section w:o encl. Department of Environmental Conservation w/o encl. ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 28, 1999 Mr. Robert Christenson Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Permit to Drill for 1R-01A -1999 Alaska Oil & Gas Cons. ComrrlJssion Anchorage Dear Mr. Commissioner: ARCO Alaska, Inc., as operator of the Kuparuk Unit well, 1R-01A, submits the enclosed Permit to Drill. This permit is intended to replace the permit application we submitted in November 1998 for this well, approval # 98-237 and the Application for Sundry Approval for abandonment of 1R-01, approval # 398-305. If you have any questions regarding this matter, please contact me at 265-6120 or Bill Lloyd at 265-6531. Sincerely, Graham C. Alvord Drilling Engineering Supervisor GCA/skad ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 October 27, 1999 Robert Christenson, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Re: Application for Permit to Drill: KRU :lR-Ola Surface Location: :154' FNL :139' FWL Sec 20 T12N R10E, UM Target Location: :1672' FNL, :1984' FEL Sec. 20, T:12N, R10E¢ UM Bottom Hole Location: 137' FNL, 23:13' FWL Sec. 29¢ T12N~ R:1OE, UM Dear Commissioner Christenson, ARCO Alaska, :[nc. hereby applies for a Permit to Drill an onshore development well to the Kuparuk interval from 1C pad in the Kuparuk River Unit ("KRU"). The well is designed to penetrate and further develop the production potential of the Kuparuk sands in the vicinity of 1R pad. The well is designated as a horizontal sidetracked production well, exiting from the existing 7" intermediate casing of the 1R-01 well. A 3-1/2" production liner will be run and cemented and the well will be completed with 3-1/2" tubing. Please find attached information as required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1) 2) 3) 4) Form 10-401 ApplicatiOn for Permit to Drill per 20 AAC 25.005 (a). Fee of $100 payable to the State of Alaska per 20 AAC 25.005 (c) (1). A directional plat showing the surface and bottomhole locations proposed for the well per 20 AAC 25.005 (c) (2). Directional plots and proximity calculations in accordance with the requirements of 20 AAC 25.050. C V hi' 7) 8) ARCO does not anticipate the presence of H2S in the formations to be encountered in this well. However, H2S monitoring equipment will be functioning on the rigs as is the standard operating procedure in the Kuparuk River Unit drilling operation. 5) A complete proposed casing and cementing program is attached as per 20 AAC 25.030. A wellbore schematic is also attached visually depicting the proposed well and completion design. 6) The drilling fluid program, in addition to the requirements set forth i~, 20 ~C 25.033 are a~ached in this APD package. A copy of the proposed drilling program. Robert Christenson Application for Permit to Drill - 1R-01 a Page 2 9) Due to the large volume of regional information available, ARCO considers this well to be a development well, and as such, no mudlogging operations such as type log generation and sample catching are planned. The following are ARCO's designated contacts for reporting responsibilities to the Commission: 1) 2) Completion Report Technologist (20 AAC 25.070) Geologic Data and Logs (20 AAC 25.071) Sharon AIIsup-Drake, Drilling 263-4612 Hark Longden, Geologist 263-4506 The anticipated spud date for this well is November 25, 1999. If you have any questions or require further information, please contact Bill Lloyd at (907) 265- 6531 or Chip Alvord at (907) 265-6120. William"B. _Lloyd, I I~ Senior Ddlh'ng Er~i~eer CC: Kuparuk :l.R-Ola Well File Chip Alvord ATO-1030 Jim Burd ATO-1282 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2o 25.005 la. Type ofwork: Drill ~Redri,l F'~ lb. Z;pe ofwel,'. E)~ploratory D StratigraphicTest D Development Oil [] Re-entry FI Deepen FI Service FI Development Gas FI Single Zone r~ Multiple Zone E] 2. Name of Operator 5. Datum elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB~g~) JZ~ feet 3. Address 6. Property Designation ,~_E~ ~'&,~"~ Kuparuk River Field P.O. Box 100360 Anchorage, AK 99510-0360 :~¢t~ ADL 25640 ALK 2571 ,Z~) Kuparuk River Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.0251) 154' FNL, 139' FWL, Sec. 20, T12N, R10E, UM Kuparuk River Unit Statewide At top of productive interval 8. Well number Number 1672' FNL, 1984' FEL, Sec. 20, T12N, R10E, UM 1R-01A #U-630610 At total depth 9. Approximate spud date Amount 137' FNL, 2313' FWL, Sec. 29, T12N, R10E, UM November 25, 1999 $200,000 12. Distance to nearest propert~ line (~ [ 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) <~'~,~-7~ ~ i feet/~ None feet 2459 12022'gD/6540 'IYD 18. To be completed for deviated wells 17. Anticipated pressure (see~.. G 25.035 (e)(2)) Kickoff depth: 6496 MD Maximum hole angle 94.7° Maximum surface $097 psi§ At total depth (TVD) 3674 psi§ t 8. Casing program Setting Depth size Specifications Top Bottom Quantity of Cement Hole Casin~ Weight Grade Couplin~l ken~th MD -I-VD MD IVD {include sta[le data/ 6.125" 3.5" 9.3# L-80 BTC 5674' 6348' 5220' 12022' 6540' 990 sx Class G sidetrack - top of window @ 6498' 19. To be completed for RedrJll, Re-entry, and Deepen Operations. Present well condition summary Total Depth: truemeasuredvertical 6898570 feet 1 feet Plugs(measured) ORIGINAL Effective Depth: measured 8453 feet Junk (measured) true vertical 6797 feet Casing Length Size Cemented Measured depth True Medical depth Conductor 115' 16" 250 sx CS 11 115' 115' Surface 4380' 9.625" 1250 sx PF E III, 420 sx PFC 4380' 3867' Production 8535' 7" 250 sx Class G & 200 sx PFC 8535' 6864' Perforation depth: measured 8004'-8103', 8199'-8245', 8289'-8300' 00"l' 2 .¢;~ ]999 true vertical 6446'-6523', 6597'-6634', 6668'-6678'Alaska 0it & Gas Cons, 00mm, issi0ri Anr:.hnr2n¢. 20. Attachments Filing fee [~] Property Plat E~ BOP Sketch [~] Diverter Sketch D Drilling program [~] Drilling fluid program [~] Time vs depth plot FiReffaction analysis FI Seabed report FI 20 AAC 25.050 requirements 21. I hereby certify that the foregoing is true and correct to the best of my knowledg6 Questions? Carl Bill Lloyd265-653 Signed ~ E. ~ Title: Date ~ ~1~ A¢,~ ~ i,.~0 ~) Drilling Engineering Supervisor Pren~red bv Sharon AIl.¢un-Dr~k~ Commission Use Chi} Permit Number APl number _ date See cover letter /gS'-"~'~I 50-~:;)~-'ff'"'~///'"//~)~'--¢/ I Approval [~,--~:~-~"~q~ for other requirements Conditions of approval Samples required FIYes [~ No Mud Icg required FI Yes .~ No Hydrogen s,lfidemeasures D Yes J~ No Directior~al survey required .~ Yes D No Required working pressure for BOPE D2M; FI 3M; ~ 5M; ~ 10M;D Other: -~O~__~h ~)~, ~ .~--~%~ by order of .....(~ Approved by (~R~I,AL._. , _~., ~.~,__._,~_..,,..,....,S~(~I~ED'~Y Commissioner the commission Date I h{ Rubei~ N ~,~: Form 10~401 Rev. 12/1/85 · Submit in triplicate ARCO Alaska, Inc. Post Office Box lbu360 Anchorage, Alaska 99510-0360 October 27, 1999 Robert Christenson, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Re: Application for Permit to Drill: KRU Surface Location: :154' FNL :11.39' FWL Sec 20 T:12N R:IOE, UM Target Location: :1672' I:NL, :1984' FEL Sec. 20, T:12N, R:IOE, UM Bottom Hole Location: :137' FNL, 2313' FWL Sec. 29, T:12N, R:1OE, UM Dear Commissioner Christenson, ARCO Alaska, Inc. hereby applie r a Permit to Drill an onshore development well to the Kuparuk interval from l'J2'pad in the Kuparuk River Unit ("KRU"). The well is designed to penetrate and further develop the production potential of the Kuparuk sands in the vicinity of 1R pad. The well is designated as a horizontal sidetracked production well, exiting from the existing 7" intermediate casing of the 1R-01 well. A 3-1/2" production liner will be run and cemented and the well will be completed with 3-1/2" tubing. Please find attached information as required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1) Form 10-401 Application for Permit to Drill per 20 AAC 25.005 (a). 2) Fee of $100 payable to the State of Alaska per 20 AAC 25.005 (c) (1). 3) A directional plat showing the surface and bottomhole locations proposed for the well per 20 AAC 25.005 (c) (2). 4) Directional plots and proximity calculations in accordance with the requirements of 20 AAC 25.050. 5) A complete proposed casing and cementing program is attached as per 20 AAC 25.030. A wellbore schematic is also attached visually depicting the proposed well and completion design. 6) The drilling fluid program, in addition to the requirements set forth in 20 AAC 25.033 are attached in this APD package. 7) A copy of the proposed drilling program. 8) ARCO does not anticipate the presence of H2S in the formations to be 00~¢ ?_' 9 !999 encountered in this well. However, H2S monitoring equipment will be functioning on the rigs as is the standard operating procedure in t~sk~ 0il & Gas C0ris. 00rri,.r¢t[ssi0.n Kuparuk River Unit drilling operation. Anchora~¢ Robert Christenson Application for Permit to Drill - 1R-01 a Page 2 9) Due to the large volume of regional information available, ARCO considers this well to be a development well, and as such, no mudlogging operations such as type log generation and sample catching are planned. The following are ARCO's designated contacts for reporting responsibilities to the Commission: 1) 2) Completion Report Technologist (20 AAC 25.070) Geologic Data and Logs (20 AAC 25.071) Sharon AIIsup-Drake, Drilling 263-4612 Mark Longden, Geologist 263-4506 The anticipated spud date for this well is November 25, 1999. If you have any questions or require further information, please contact Bill Lloyd at (907) 265- 6531 or Chip Alvord at (907) 265-6120. William"B. Lloy~ I !-- -' - '- - ' Senior Drilling Er~gi~eer CC: Kuparuk 1R-Ola Well File Chip Alvord ATO- 1030 Jim Burd ATO-1282 I Well Name: I I R-01a Well Plan Summary Type of Well (producer or injector): I Producer Surface Location: 154' FNL, 139' FWL, Sec. 20, T12N-R10E Tie-in Survey: 1095' FNL, 2378' FEL, Sec. 20, T12N-R10E Target #1 Start Location: 1672' FNL, 1984' FEL, Sec. 20, T12N-R10E Target #2 Start Location: 1922' FNL, 1986' FEL, Sec. 20, T12N-R10E Target #3 Start Location: 2122' FNL, 1988' FEL, Sec. 20, T12N-R10E Target #4 Start Location: 2458' FSL, 2144' FEL, Sec. 20, T12N-R10E Target #5 Start Location: !560' FSL, 2352' FEL, Sec. 20, T12N-R10E Target #6 Start Location: 1060' FSL, 2456' FEL, Sec. 20, T12N-R10E Target #7 Start Location: 262' FSL, 2466' FWL, Sec. 20, T12N-R10E Target #8 Start Location: !37' FNL, 2313' FWL, Sec. 29, T12N-R10E Bottom Hole Location: 137' FNL, 2313' FWL, Sec. 29, T12N-R10E I AFE Number: I AK I I Rig: Pool 6 Estimated Start Date: I 11/25/99 Operating days to complete: I 26 KOP MD: TD MD: 6500' 12024' KOP TVD: TD TVD: 5249'ss 6540'ss RKB/ 180' Surface Elevatio I5' (a.m.s.I) Well Design (conventional, slimhole, etc.): I Horizontal Sidetrack Producer Objective: I Selectively geo-steer well to optimally drain 2 - Kuparuk A sand fault blocks Formation Markers Formation Tops MD TVD (SS) Remarks Tie-In Survey 6498 5249 Build 10°/100' KOP 6498 5249 EOC 6776 5488 End 10°/100' C30 7212 5907 C20 7311 6OO2 7336 6026 Begin Build & turn; 10°/100' Base HRZ 7371 6060 Top Kup C 7702 6347 Top B Shale 7760 6388 EOC 8114 6535 End 10°/100' Target #1 - Top A4 8114 6535 Top A3 8367 6570 Target #2 - Top A3 8367 6570 Build 6°/100' EOC 8489 6579 End 6°/100' Target #3 - A3 t2 8567 6580 Build 6°/100' EOC 8817 6587 End 6°/100' Target #4 - A3 t3 9286 6605 Target #5 - A4 t2 10208 6605 Curve 3°/100' EOC 20306 6602 End 3°/100' curve Target #6 - A3 upthrn 10741 6580 Curve 3°/100' EOC 11018 6574 End 3°/100' curve 11320 6578 Curve 3°/100' Target #7 - A3 upthrn 11568 6575 EOC 11658 6570 End 3°/100' curve Target #8 - TD 12022 6540 Casing/Tubin__cl Program Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/I'VD MD/'rVDss 6-1/8" 3-1/2" 9.3# L-80 EUE-Mod 5674' 6348'/5220' 12022'/6540' tubing 3-1/2" 9.3# L-80 EUE-mod 6348' Surf. 6348'/5220' General Mud Program Production Mud Properties: LSND 6-1/8" hole section Density Viscosity Yield 10 sec 10 min pH APl HTHP (PPG) Point gel gel Filtrate Filtrate 11.0 45-50 20-24 6-8 8-10 8-9 4-6 10-13 Drilling Fluid System Triple Derrick Shale Shakers Desander, Desilter, Mud Cleaner Centrifuge Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Degasser Fluid Agitators Drilling fluid practices will be in accordance with the regulations stated in 20 AAC 25.033. Well Proximity Risks: There are no close approach issues in this well plan. Directional KOP: Maximum Hole Angle: Close Approach Well: Cement +6500' MD (estimated) 94.7° None First Stage Second Stage Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 3-1/2" Liner 990/15.8/1.2 None 150' liner lap, TOC 200' above TOL, Class "G" cement, 50% excess in open hole Lo _qin_q Pro_qram LWD Logging: 6-1/8" Hole MWD lAB directional / GR / Res Open Hole Logs (eline): 6-1/8" Hole Cased Hole Logs (eline): None None Well Control Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and will be capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics for Pool 6 are on file with AC)GCC. Maximum anticipated surface pressure (MASP) while drilling the production hole is calculated using a KOP leak-off of 13.5 ppg EMW (0.70 psi/ft) and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur at a surface pressure of 3,097 psi. MASP = (5249 ft)(0.70 - 0.11) = 3,097 psi Based on offset well data, reservoir pressures in the Kuparuk sands in the vicinity of 1R pad are expected to be -3,500 psi (0.54 psi/ft). Assuming a 150 psi overbalance is required to safely drill and trip in this formation, then a required mud weight of 10.9 ppg can be predicted as the maximum mud weight needed to safely drill in this formation, assuming a TVD of 6,432'. Target (Kuparuk C) ( 3500+ 150)/(0.052'6432 )= 10.9. Hazards · This well will penetrate -160' of HRZ at 16° in the 6-1/8" section. Good drilling practices, including optimized flow rates of 240-250 gpm, slower trip and connection speeds, pumps at 40% when reaming connections, larger nozzle area for reduced sidewall erosion, all will assure a trouble free interval. · There is I known fault in the reservoir interval, anticipated to be ~30' throw. Lost circulation across the faults will be controlled with non-productive zone LCM pills. · Lost circulation across the fault, into the reservoir matrix, or wellbore "breathing" into exposed shales as a function of excessive ECD (equivalent circulating density). ECD will be controlled and monitored with the addition of a PWD (pressure-while-drilling) sub in the BHA. Disposal Cuttings should be processed with the Pool 6 ball mill and transported to DS1R-18 for injection. Fluid Handling: All drilling and completion fluids and other Class II wastes to DS1R:18 for injection. Haul all Class I waste to Pad 3 for disposal. Cement rinseate must be processed through the MI unit prior to injection in DS1R-18. 1R-Ola Short Well Summary Pre-Rig Work: NOTE: If any problems are observed with the 7" packoff during pre-rig operations, notify the Operations Drilling Engineer, Pool 6 Company Representative and the wellhead manufacturer. Repairs will be made prior to initiation of rig work. 1. RU wireline and dummy off GLM's at 2279', 4295', 5543', 6234', 6672', 7113', 7487' and 7902'. Test 7" and tubing packoffs to 5000 psi and function LD screws. Pressure test 7" casing to 3500 psi for 30 mins. 2. RIH and set blanking plug in D nipple at 8141' MD to isolate A sand. Pressure test tubing to insure plug is set. RIH and pull isolation sleeve from AVA at 8128' MD to open C sand. 3. RU pump truck and perform C sand injectivity test for CTU squeeze. Bullhead +/-15 bbls of diesel down tubing into C sand perforations. Record all pressures and rates. MIRU electric line and RI tubing with collar Iocator and 3-1/2" cement retainer to +/-7980' MD. Set retainer in the middle of the 6' pup joint below the Camco HRP-1-SP packer and above the Camco MMG-W 1.5" mandrel. 5. RU CTU. RIH and sting into cement retainer. Establish injection into C sand perfs and record breakdown pressure and rate. Note final rate and pressure on morning report. Squeeze 31 bbls of 15.8 ppg Class G cement below the retainer as follows: 6 bbls for the 3-1/2" tubing and 3-1/2" x 7" annular volume between packers, and 25 bbls into the C sand perfs. Unsting from retainer and circulate any excess cement from well bore. RDMO CTU. 7. RU slickline unit. RIH and pull dummy valve from bottom GLM and leave pocket open. RU e-line unit. RIH and cut 3'/2" tubing at +/-7930' MD. Target the middle of the first full joint above the HRP-1-SP packer. (Note: Utilize most efficient cuttin.q mechanism. Remaininq tubing below cut will not be further utilized) RD electric line. 9. Circulate seawater through cut until clean returns are observed. Freeze protect tubing and annulus to 2200' with diesel. Bleed pressures on tubing/annulus. Zero pressure on all annuli is required. 10. Set and test BPV, remove well house and flow lines, level pad and dig out cellar. Notify Operations Drilling Engineer upon completion of work. Rig Work: 1. If 7" packoff does not test during pre-rig, contact the wellhead manufacturer's representative to initiate repairs. 2. MIRU. Pull BPV and set and test TWCV to 1000 psi. ND tree and NUBOPE and test same per AAI policy. Pull TWCV. 3. Circulate out freeze protection with seawater and attempt to pull 31/=" tubing above cut at -7930'. Have grapple and spears available to fish remaining tubing in the event of additional parts. . . RU wire line and make a CCL/gauge ring/junk basket run to ~7000'. RD wireline. PU 7" CIBP on wire line, RIH and set @ 6515'. Use CET log dated 9/9/85 as tie-in correlation log. Test 7" and bridge plug to 3500 psi. PU Baker Bottom Trip Anchor whipstock and BHA and RIH. Install ditch magnets in troughs. RIH to -6400' and establish string parameters. Continue in hole to CIBP and orient and set whipstock. 6. Displace well to milling/drilling fluid. Shear whipstock bolt and begin milling window in 7". Mill until 29' of BHA is in the open hole. Circulate well clean until no metal is seen in returns. Perform LOT to a minimum of 12.5 ppg. POOH and LD milling assembly. 7. PU 6V8" BHA and RIH. Displace wellbore to 10.9 ppg drilling fluid and drill 6'/8" horizontal wellbore to 12022' MD. Use MWD/GR/Res in real time for evaluation. 8. Run 3~/2'' solid liner to TD and cement. 9. Run 3'/2" L-80 standard Kuparuk gas lift completion. Circulate freeze protection to 2200'. Sting SBE into PBR on top of liner top packer. 10. Set and test TWCV to 1000 psi. ND BOPE, NU Tree. Pull TWCV and set/test BPV. RDMO. Crected by finch FOR: LLOYD Dote plotted: 25-0ct-1999 Plot Reference is lA Version ~10. ICoordTnetes ore ;n feet. reference Blot ~IA. I'frue Vertical aepths~ce rkb Pool ~6 ARCO Alaska, InC. Structure : Pad 1R Well: lA Field : Kuparuk River Unit Location : North Slope, Alaska 4800 - 5000 - 5200 fl) 5400 fl) ¢- 5600 5800 0 6000 >. fl) 6200 I 6400 ¥ 6600 68O0 7000 7 W~ndow J EOC Begin Build & Turn B/HRZ - T/Kolub]k 195.0 AZIMUTH ***Plane of Proposal*** / k 43.53 Sidetrack Point 33.53 23.53 DLS: 10.00 deg per 100 ft I I I I I I I I I I I I I I I I I I I I I I I I I II I II I I I I I I I I I I I I I I I I I I I I I 400 200 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 ,5200 5400 3600 5800 4000 4200 4400 4600 Verficol Section (feet) -> Azimuth 195.00 with reference 0.00 5, 0.00 W from slot #lA Cmo~ed by finch DO~ plc~ed: 25-Oct-tgc~ C~t~ om ~n ~ mf~ slot ~1~ Tree V~l O~s om ~mn~ ~b Pool ARCO Alaska, Inc. Structure: Pad 1R Well : lA Field: Kuparuk River Unlf Location : North Slope, Alaska 900 1200 I I I SIDETRACK POINT: 1095' FNL, 2578' FEL SEC. 20, T12N, RIOE TARGET #1: 1672' FNL, 1984' FEL SEC. 20, T12N, RIOE TARGET #2: 1922' FNL, 1986' F-EL SEC. 20, T12N, RIOE TARGET 2122' FNL, 1988' FEL SEC. 20, T12N, RIOE TARGET #4: I 2¢58' FSL, 2144' FEL SEC. 20, T12N, RIOE TARGET #5: I 1560' FSL, 2352' FEL SEC. 20, T12N, RIOE TARGET #6: 1060' FSL, 2456' FEL SEC. 20, T12N, RIOE TARGET #7: 262' FSL, 24-66' FWL SEC. 20, T12N, RIOE TARGET #§ - TD LOCATION: 137' FNL, 2313' FWL SEC. 29, T12N, RIOE 1500 . East (feet) -> 1800 2100 2400 2700 3000 3300 3600 3900 4200 4500 4800 I I I I I I I I I I I I I I I I I I I I I I ~._ Sidetrock Point 7 Window B/HRZ - T/Kolubi~ I ~ I EOC Begin Build & Turn Forget #4-A3 t3/EOC Torget #5-A4- t2/Begin Build EOC Torget #6-A3 UpThrn/Begin Drop&Turn EOC Begin Build&Turn Torget #7-A3 UpThrn t2/Begin Build EOC Torget #8-TD/Coslng Pt 5100 I 60O 9OO 1200 1500 1800 2100 2400 2700 3000 5600 3900 4200 45OO 48O0 5100 5400 5700 I V Dnte p~of~J: 25-0ct-1999 Plot Reference ~s IA Version Coord[n=~;; =re ;n feet re~er~nce True Vent~cal Oepb"~ am raFm'e-nc;e r'kb c~t~d ~ r,~h FOR: LLOYD Ai CO Alaska, Inc. Struoture : Pad 1R Well : lA Field : Kuparuk River Unit Location : Norlh Slope, Alaska East (feet) -> 1950 2100 2250 2400 2550 2700 2850 3000 5150 5500 3450 5600 3750 3900 4050 4200 500 I I I I I I I I I ! I I I I I I I I I I I I I I I I I I i 500 450 600 ~_700 2900 3100 3300 35OO 450 600 500 750 5500 3700 750 4900 3700 3900 3900 5100 4100 900 900 ~e on - 5328.57 Tvd, 5.39 E 4300 5900 4500 1050 5700 1050 6500 5900 6100 6500 1200 6500 1200 6500 6700 3900 4100 3100 4300 4500 Target - 6615.00 Tvd, 1516.95 S, 3162.93 E Target - 6650.00 Tvd, 1766.96 S, 3161.60 E 1550 1500 1650 I V 1800 1350 1500 1650 I 1800 V 1950 2100 2250 2400 2550 270O 3500 4700 4900 Target - 6685.00 Tvd, 2666.25 S, 3006.81 E Target - 6660.00 Tvd, 1966.97 S, 5160.54 E 3900 5300 41 O0 55OO 4300 57OO 1950 2100 2250 2400 255O 2700 2850 , , , , , , , , , , ~ , , , , , , , , , , , , , 2850 1950 2100 2250 2400 2550 2700 2850 5000 5150 3500 5450 5600 5750 5900 4050 4200 East (feet) -> Ic~t~ ~ ~nc~ FOR: LLOYD Dote plotted: ~-1~9 PI~ Ref~n~ ~ IA V~ ~10. ARCO Alaska, Inc. Structure : Pad 1R Well : lA Field : Kuparuk River Unit Location : North Slope, Alaska 400 800 1200 1600 2000 2400 2800 .=1,.= O~ 5200 -~- 5600 0 4000 I v 4400 4800 5200 5600 6000 64O0 6800 East ([feet) -> 400 800 1200 1600 2000 2400 2800 5200 5600 4000 4400 4800 5200 5600 6000 6400 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 400 2gO~O 5500 5500 5700 5goo 900 3700 610 6500 650( 670( 4500  4700 4900  5100 5300  5500 6100  6500 6500 2100 3300 2300 3500 5300 5700 5900 4100 43OO 3100 3300 5500 4100 4100 4300 45O0 4700 6300 '""---~6100 6500 ~""---~500 4900 5300 5700 Target - 6615.00Tvd, 1516.93 S, 5152.95 E 490( 5100 Target - 6650.00 Tvd, 1766.96 S, 3161.60 E ITorgetO - 6660.00 Tvd, 1966.97 S, 3160.54 E 4100 4300 4500 J, 2666.23 S, 5006.81E 4700 5900 4900 6100 5100 ~6~00 ,.65oo % 6700 Target - 6685.00 Tvd, 3565.2~k.S, 2802.02 E 5500 55OO Target - 6660.00 Tvd, 4084.77 S, 2685.67 E 6100 800 1200 16oo 2OOO 2400 2800 0 3200 5700 5600 '-~ 5900 P 4000 I V ~- 4400 let - 6655.00 Tvd, 4860.00 S, 2400.00 E & Target - 6620.00 Tvd, 5262.21 S, 2192.94 E o ~63~~ 6500 6500 0 i i i J(]sI i i i i i i i i i I i i i i i i i i i i i i i i i i i i 400 800 1200 1600 2000 2400 2800 5200 5600 4000 4400 4800 5200 5600 6000 6400 East (feet) -> 4800 52OO 56OO 6O0O 6400 6800 Creoted by rixee FO~: LLOYD Date plotted : 25-0ct-1999 Plot Reference Ts lA Version ~10. Coord~notes ere ~n feet reference slot t~lA. '[rue Vertlcol Depths ore reference rkb Pool 1~6 INTEQ AI CO Alaska, Inc. Structure: Pod 1R Well: lA Field: Kuperuk River Unif Locoflon : North Slope, AlaskQ PROFILE COMMENT Point MD Inc Dir TVD Sidetrack Point 6498.02 43.73 105.90 5328.58 EOC 6776.72 1 5.86 106.85 5568.07 C30 7212.23 1 5.86 106.83 5987.00 C20 7310.99 1 5.86 106.83 6082.00 Begin Build & Turn 7335.60 15.86 106.83 6105.67 B/HRZ - T/Kalubik 7371.39 17.06 118.75 6140.00 Top C 7701.71 42.84 165.24 6427.00 Top B Shale 7760.28 48.27 168.30 6468.00 EOC 8114.1 6 82.03 180.50 6615.00 Target # 1 -Top A4/EOCg?;-i- 8114.18 82.03 180.30 6615.00 Top A3 8566.66 82.03 1 80.30 6650.00 Target #2-Top A3/Begg?~- 8366.68 82.03 180.50 6650.00 EOC 8489.20 89.58 1 80.30 6659.1 6 Target #3-A5 t2/Begig?T 8567.13 89.38 180.51 6660.00 EOC 8816.65 87.48 195.16 6666.87 Begin Build & Turn 9171.13 87.48 195.16 6682.48 Target #4-A3 t3/EOC 9285.57 90.00 192.83 6685.00 Target #5-A4 t2/Begig?T 10207.61 90.00 192.83 6685.00 EOC 10306.26 92.96 192.83 6682.45 Target #6-A3 UpThrn/g?T 10741.07 92.96 192.85 6660.00 EOC 11017.99 89.34 200.32 6654.43 Begin Build&Turn 11320.90 89.34 200.32 6657.90 Target #7-A3 UpThrn g?T 11568.11 92.00 207.24 6655.00 EOC 11 657.75 94.69 207.24 6649.77 Target #8-TD/Casing g?T 12021.82 94.69 207.24 6620.00 DATA North -959.61 -977.78 -1012.25 -1020.06 -1022.01 -1025.95 -1161.64 -1202.53 -1516.95 -1516.95 -1766.96 -1766.98 -1889.07 -1966.99 -2213.45 -2555.26 -2666.26 -3565.27 -3661.41 -4084.79 -4349.92 -4633.96 -486O.O2 -4939.58 -5262.19 East 2766.40 2898.10 3012.03 3037.86 3044.30 3053.59 3126.72 3136.23 3162.93 3162.93 3161.60 3161.60 3160.95 3160.54 3127.09 3034.47 3006.81 2802.01 2780.11 2685.66 2604.74 2499.58 2399.99 2559.05 2192.95 V. Sect 191.60 194.38 198.18 199.05 199.26 200.67 512.80 349.65 646.62 646.64 888.47 888.49 1006.58 1081.96 1328.67 1682.81 1797.19 2718.57 2817.10 5251.02 3527.54 3829.15 4073.26 4160.70 4515.51 Deg/lO0 10.00 0.00 0.00 0.00 10.00 10.00 10.00 10.00 0.92 0.00 6.00 6 O0 6.00 0.00 0.93 3.00 3.00 3.00 3.00 0.00 3.00 3.00 0.00 c.,-.~ ~/~ FOR: LLOYD Date plated: 25~-1~ Pl~ Ref~nce Is tA V~I~ ~10. 33O 3~0 ARCO Alaska, Inc. Structure : Pad 1R Well : lA Field : Kuparuk River Unlt Location : Nor-th Slope, Alaska TRUE NORTH 350 0 10 340 20 30 40 310 50 3OO 60 2go 70 280 270 3O 80 90 260 100 250 110 240 120 230 130 220 140 210 150 200 1 60 190 180 170 Normal Plane Travelling Cylinder - Feet All depths shown (]re Measured depths on Reference Well ARCO Alaska, Inc. Pad 1R lA slot #lA Kuparuk River Unit North Slope, Alaska PROPOSAL LISTING INCLUDING POSITION UNCERTAINTIES by Baker Hughes INTEQ Your ref : lA Version #10 Our ref : prop3679 License : Date printed : 23-0ct-1999 Date created : 22-0ct-1999 Last revised : 23-0ct-1999 Field is centred on n70 16 18.576,w150 5 56.536 Structure is centred on n70 23 12.884,w149 40 37.889 Slot location is n70 23 11.369,w149 40 33.820 Slot Grid coordinates are N 5991049.979, E 539829.377 Slot local coordinates are 154.00 S 139.00 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ARCO Alaska, Inc. Pad IR, lA Kuparuk River Unit,North Slope, Alaska PROPOSAL LISTING Page 1 Your ref : lA Version#10 Last revised : 23-0ct-1999 Measured Inclin. Azimuth True Vert R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect 6498.00 43,73 105.90 5328,57 939.61S 2766.39 E 0.00 191.60 6498.02 43.73 105.90 5328.58 939.61 S 2766.40 E 10.00 191.60 Sidetrack Point 6500,00 43.53 105.90 5330.02 939.99 S 2767.71 E 10.00 191.62 6600.00 33.53 106.07 5408.15 957.11 S 2827.52 E 10.00 192.68 6700.00 23.53 106.37 5495.89 970.42 S 2873.33 E 10.00 193.68 6776.72 15.86 106.83 5568.07 977.78 S 2898.10 E 10.00 194.38 EOC 7000.00 15.86 106.83 5782.85 995.45 S 2956.51 E 0.00 196,33 7212.23 15.86 106.83 5987.00 1012,25 S 3012.03 E 0.00 198.18 C30 7310.99 15.86 106.83 6082.00 1020.06 S 3037.86 E 0.00 199.05 C20 7335.60 15.86 106.83 6105.67 1022.01 S 3044.30 E 0.00 199.26 Begin Build & Turn 7371.39 17.06 118.75 6140.00 1025.95 S 3053.59 E 10.00 200.67 B/HRZ - T/Kalubik 7400.00 18.46 126.95 6167.25 1030.69 S 3060.89 E 10.00 203.36 7500.00 25.29 146.88 6260.12 1058.17 S 3085.27 E 10.00 223.59 7600.00 33.66 158.10 6347.17 1101.89 S 3107.34 E 10.00 260.10 7700.00 42,68 165.14 6425.74 1160.51 S 3126.42 E 10.00 311.79 7701.71 42.84 165.24 6427.00 1161.64 S 3126.72 E 10.00 312.80 Top C 7760.28 48.27 168.30 6468.00 1202.33 S 3136.23 E 10.00 349.65 Top B Shale 7800.00 52.00 170,09 6493.45 1232.27 S 3141.93 E 10.00 377.09 7900.00 61,48 173.91 6548.25 1314.98 S 3153.40 E 10.00 454.01 8000.00 71.05 177.09 6588.46 1406.12 S 3160.48 E 10.00 540.22 8100.00 80,67 179.92 6612.87 1502.94 S 3162.96 E 10.00 633.09 8114.16 82,03 180.30 6615.00 1516.93 S 3162.93 E 10.00 646.62 Target #1 Top A4-1ROiA 8114.18 82.03 180.30 6615.00 1516.95 S 3162.93 E 0.00 646.64 Target #1-Top A4/EOC 8134.66 82.03 180.30 6617.84 1537.24 S 3162.82 E 0.00 666.26 8234.66 82.03 180.30 6631,71 1636.27 S 3162.30 E 0.00 762.06 8334.66 82.03 180.30 6645.57 1735.31 S 3161.77 E 0.00 857.85 8366.62 82,03 180.30 6650.00 1766.95 S 3161.60 E 0.00 888.46 Top A3 8366.66 82.03 180.30 6650.00 1766.96 S 3161.60 E 0.00 888.47 Target#2 Top A3-1ROiA 8366,68 82.03 180,30 6650,00 1766.98 S 3161.60 E 6.00 888.49 Target#2-Top A3/Begin Build 8399.45 84.00 180.30 6653.99 1799.50 S 3161.43 E 6.00 919.95 8489.20 89,38 180.30 6659.16 1889.07 S 3160.95 E 6.00 1006.58 EOC 8500.00 89.38 180.30 6659.28 1899,87 S 3160.90 E 0.00 1017.03 8567.11 89,38 180.30 6660.00 1966.97 S 3160.54 E 0.00 1081.94 Target #3-A3 Tgt2 1RO1A 8567.13 89.38 180.31 6660.00 1966.99 S 3160.54 E 6.00 1081.96 Target#3-A3 t2/Begin Drop & Turn 8600.00 89.13 182.26 6660.43 1999,85 S 3159.80 E 6.00 1113.89 8700.00 88.36 188.21 6662.62 2099.36 S 3150.68 E 6.00 1212.37 8800.00 87.60 194.17 6666.16 2197.36 S 3131.30 E 6.00 1312.04 8816.65 87.48 195.16 6666.87 2213.45 S 3127.09 E 6.00 1328.67 EOC 9000.00 87.48 195.16 6674.95 2390,25 S 3079.18 E 0.00 1511.85 9171.13 87.48 195.16 6682.48 2555.26 S 3034.47 E 0,00 1682.81 Begin Build & Turn 9200.00 88.11 194.57 6683.59 2583.14 S 3027.07 E 3.00 1711.66 9285.55 90.00 192,83 6685.00 2666.23 S 3006.81 E 3.00 1797.17 Target #4 A3-Tgt3 1ROiA 9285.57 90.00 192,83 6685.00 2666.26 S 3006.81 E 0.93 1797.19 Target~4-A3 t3/EOC 9500,00 90.00 192.83 6685.00 2875.33 S 2959.18 E 0.00 2011.47 10000.00 90.00 192.83 6685,00 3362.84 S 2848.13 E 0.00 2511.11 10207.59 90.00 192.83 6685.00 3565.25 S 2802.02 E 0.00 2718.55 Target ~5 A4-Tgt2 1RO1A 10207.61 90.00 192.83 6685.00 3565.27 S 2802.01 E 3.00 2718,57 Target#5-A4 t2/Begin Build 10306.26 92.96 192.83 6682.45 3661.41 S 2780.11 E 3.00 2817.10 EOC 10500.00 92.96 192.83 6672.45 3850.06 S 2737.14 E 0.00 3010.45 10741.05 92.96 192.83 6660.00 4084.77 S 2683.67 E 0.00 3251.00 All data is in feet unless otherwise stated. Coordinates from slot #lA and TVD from rkb Pool ~6 (80,00 Ft above mean sea level). Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead. Total Dogleg for wellpath is 152.86 degrees. Vertical section is from S 0.00 W 0.00 on azimuth 195,00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARco Alaska, Inc. Pad 1R, lA Kuparuk River Unit,North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C 0 0 R D I N A T E S PROPOSAL LISTING Page 2 Your ref : 1AVersion #10 Last revised : 23-0ct-1999 Dogleg Vert Deg/lOOft Sect 10741.07 92.96 192.83 6660.00 4084.79 S 2683.66 E 3.00 3251.02 Target #6-A3 UpThrn/Begin Drop&Turn 10800.00 92.19 194.43 6657.35 4142.00 S 2669.79 E 3,00 3309.88 10900.00 90.89 197.13 6654.66 4238.19 S 2642.61 E 3.00 3409.82 11000.00 89.58 199.83 6654.26 4333.02 S 2610.92 E 3.00 3509.62 11017.99 89.34 200,22 6654.43 4349.92 S 2604.74 E 3.00 3527.54 EOC 11320.90 89.34 200.32 6657.90 4633.96 S 2499.58 E 0.00 3829.13 Begin Build&Turn 11400,00 90.19 202.53 6658.22 4707.60 S 2470.69 E 3.00 3907.73 11500.00 91.27 205.33 6656.94 4798.98 S 2430.14 E 3.00 4006.49 11568.09 92.00 207.24 6655.00 4860.00 S 2400.00 E 3.00 4073.23 11568.11 92.00 207,24 6655.00 4860.02 S 2399.99 E 3.00 4073.26 Target#7-A3 UpThrn t2/Begin Build 11600.00 92.96 207.24 6653.62 4888.35 S 2385.41 E 3.00 4104.39 11657.75 94.69 207.24 6649.77 4939.58 S 2359.03 E 3.00 4160.70 EOC 12000.00 94.69 207.24 6621.79 5242.85 S 2202.91 E 0.00 4494.05 12021.82 94,69 207.24 6620.00 5262.19 S 2192.95 E 0.00 4515.31Target#8-TD/Casing Pt 12021.84 94.69 207.24 6620.00 5262.21 S 2192.94 E 0.00 4515.33 Target#SA4-Toe 1ROiA All data is in feet unless otherwise stated, Coordinates from slot #lA and TVD from rkb Pool ~6 (80.00 Ft above mean sea level). Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead. Total Dogleg for wellpath is 152.86 degrees. Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : lA Version #10 Last revised : 23-0ct-1999 Comments in wellpath MD TVD Rectangular Coords. Comment 6498.02 5328.58 939 6776.72 5568.07 977 7212.23 5987.00 1012 7310.99 6082.00 1020 7335,60 6105.67 1022 7371.39 6140.00 1025 7701.71 6427.00 1161 7760.28 6468,00 1202 8114.16 6615.00 1516 8114.18 6615.00 1516 8366.62 6650.00 1766 8366.66 6650.00 1766 8366.68 6650.00 1766 8489.20 6659.16 1889 8567.11 6660,00 1966 8567.13 6660.00 1966 8816.65 6666,87 2213 9171.13 6682.48 2555 9285,55 6685.00 2666 9285.57 6685.00 2666. 10207.59 6685.00 3565. 10207.61 6685.00 3565, 10306.26 6682.45 3661. 10741.07 6660.00 4084. 11017.99 6654.43 4349. 11320.90 6657.90 4633. 11568.11 6655.00 4860. 11657,75 6649.77 4939. 12021.82 6620.00 5262. 12021.84 6620.00 5262. 61 S 78 S 25 S 06 S 01 S 95 S 64 S 33 S 93 S 95 S 95 S 96 S 98 S 07 S 97 S 99 S 45 S 26 S 23 S 26 S 25 S 27 S 41 S 79 S 92 S 96 S 02 S 58 S 19 S 21 S 2766.40 E 2898.10 E 3012.03 E 3037.86 E 3044.30 E 3053.59 E 3126.72 E 3136.23 E 3162,93 E 3162.93 E 3161.60 E 3161.60 E 3161.60 E 3160.95 E 3160.54 E 3160.54 E 3127.09 E 3034.47 E 3006.81 E 3006 81 E 2802 02 E 2802 01E 2780 11 E 2683 66 E 2604 74 E 2499 58 E 2399 99 E 2359 03 E 2192.95 E 2192.94 E Sidetrack Point EOC C30 C20 Begin Build & Turn B/HRZ - T/Kalubik Top C Top B Shale Target #1 Top A4-1ROIA Target #1-TopA4/EOC Top A3 Target #2 Top A3-1ROIA Target#2-Top A3/Begin Build EOC Target #3-A3 Tgt2 1RO1A Target #3-A3 t2/Begin Drop & Turn EOC Begin Build & Turn Target ~4 A3-Tgt3 1ROIA Target #4-A3 t3/EOC Target ~5 A4-Tgt2 1ROIA Target#5-A4 t2/Begin Build EOC Target #6-A3 UpThrn/Begin Drop&Turn EOC Begin Build&Turn Target#7-A3 UpThrn t2/Begin Build EOC Target#8-TD/Casing Pt Target#8A4-Toe 1RO1A Casing positions in string 'A' Top MD Top TVD Rectangular Coords. Bot MD BotTVD Rectangular Coords. Casing n/a 5328.57 939.61S 2766.39E 6498.00 5328.57 939.61S 2766.39E 7" Window n/a 5328.57 939.61S 2766.39E 12021.80 6620,00 5262.17S 2192.96E 3 1/2" Liner Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised Target #7 A3-UpThrnT 542200 Target #6 A3-UpThrn 542550 Target #1TopA4-1RO 543000 Target#2 Top A3-1RO 543000 Target #3-A3 Tgt2 1R 543000 Target #4 A3-Tgt3 1R 542850 Target#5 A4-Tgt2 1R 542650 Target#8 A4-Toe 1RO 542050 000 000 000 000 000 000 000 000 ,5986200.000 0 ,5987000.000 0 5989550.000 0 5989300.000 0 ,5989100.000 0 ,5988400.000 0 ,5987500.000 0 ,5985800.000,0 0000 6655 0000 666O 0000 6615 0000 6650 0000 6660 0000 6685 0000 6685 0000 6620 O0 4862.97S O0 4064.76S O0 1516.93S O0 1766.96S O0 1966.97S O0 2666.23S O0 3565.25S O0 5262.21S 2345,08E 20-Sep-1999 2699.36E 20-Sep-1999 3162,93E 9-Jun-1999 3161.60E 20-Sep-1999 3160.54E 20-Sep-1999 3006.81E 20-Sep-1999 2802.02E 20-Sep-1999 2192.94E 20-Sep-1999 ARCO Alaska. Inc. Pad IR, lA Kuparuk River Unit,North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C 0 0 R D I N A T E S PROPOSAL LISTING Page 1 Your ref : lA Version #10 Last revised : 25-0ct-1999 Vert Ellipse Semi Axes Minor Sect Major Minor Vert. Azi. 6498.00 43.73 105.90 5328.57 939.61S 2766.39 E 191.60 65.44 26.96 21.62 288.94 6498.02 43.73 105.90 5328.58 939.61 S 2766.40 E 191.60 65.44 26.96 21.62 288.94 6500.00 43.53 105.90 5330.02 939.99 S 2767.71 E 191.62 65.46 26.96 21.63 288.94 6600.00 33.53 106.07 5408.15 957.11S 2827.52 E 192.68 66.34 27.29 21.91 288.89 6700.00 23.53 106.37 5495.89 970.42 S 2873.33 E 193.68 67.06 27.60 22.13 288.86 6776.72 15.86 106.83 5568.07 977.78 S 2898.10 E 194.38 67.47 27.84 22.27 288.84 7000.00 15.86 106.83 5782.85 995.45 S 2956.51 E 196.33 68.71 28.55 22.68 288.79 7212.23 15.86 106.83 5987.00 1012.25 S 3012.03 E 198.18 69.98 29.23 23.06 288.75 7310.99 15.86 106.83 6082.00 1020.06 S 3037.86 E 199.05 70.57 29.55 23.24 288.73 7335.60 15.86 106.83 6105.67 1022.01 S 3044.30 E 199.26 70.72 29.63 23.28 288.72 7371.39 17.06 118.75 6140.00 1025.95 S 3053.59 E 200.67 70.96 29.75 23.35 288.78 7400.00 18.46 126.95 6167.25 1030.69 S 3060.89 E 203.36 71.16 29.84 23.40 288.83 7500.00 25.29 146.88 6260.12 1058.17 S 3085.27 E 223.59 71.91 30.18 23.62 289.29 7600.00 33.66 158.10 6347.17 1101.89 S 3107.34 E 260.10 72.74 30.57 23.88 290.05 7700.00 42.68 165.14 6425.74 1160.51 S 3126.42 E 311.79 73.62 31.06 24.21 291.08 7701.71 42.84 165.24 6427.00 1161.64 S 3126.72 E 312.80 73.63 31.07 24.22 291.10 7760.28 48.27 168.30 6468.00 1202.33 S 3136.23 E 349.65 74.17 31.43 24.46 291.85 7800.00 52.00 170.09 6493.45 1232.27 S 3141.93 E 377.09 74.54 31.67 24.62 292.36 7900.00 61.48 173.91 6548.25 1314.98 S 3153.40 E 454.01 75.50 32.43 25.12 293.84 8000.00 71.05 177.09 6588.46 1406.12 S 3160.48 E 540.22 76.47 33.32 25.71 295.47 8100.00 80.67 179.92 6612.87 1502.94 S 3162.96 E 633.09 77.44 34.33 26.39 297.23 8114.16 82.03 180.30 6615.00 1516.93 S 3162.93 E 646.62 77.58 34.49 26.49 297.48 8114.18 82.03 180.30 6615.00 1516.95 S 3162.93 E 646.64 77.58 34.49 26.49 297.48 8134.66 82.03 180.30 6617.84 1537.24 S 3162.82 E 666.26 77.79 34.71 26.63 297.85 8234.66 82.03 180.30 6631.71 1636.27 S 3162.30 E 762.06 78.86 35.86 27.37 299.68 8334.66 82.03 180.30 6645.57 1735.31 S 3161.77 E 857.85 80.01 37.09 28.12 301.56 8366.62 82.03 180.30 6650.00 1766.95 S 3161.60 E 888.46 80.40 37.49 28.37 302.17 8366.66 82.03 180.30 6650.00 1766.96 S 3161.60 E 888.47 80.40 37.49 28.37 302.17 8366.68 82.03 180.30 6650.00 1766.98 S 3161.60 E 888.49 80.40 37.49 28.37 302.17 8399.45 84.00 180.30 6653.99 1799.50 S 3161.43 E 919.95 80.81 37.90 28.62 302.81 8489.20 89.38 180.30 6659.16 1889.07 S 3160.95 E 1006.58 81.99 39.05 29.35 304.59 8500.00 89.38 180.30 6659.28 1899.87 S 3160.90 E 1017.03 82.14 39.19 29.44 304.80 8567.11 89.38 180.30 6660.00 1966.97 S 3160.54 E 1081.94 83.08 40.05 29.99 306.15 8567.13 89.38 180.31 6660.00 1966.99 S 3160.54 E 1081.96 83.08 40.05 29.99 306.15 8600.00 89.13 182.26 6660.43 1999.85 S 3159.80 E 1113.89 83.53 40.48 30.27 306.82 8700.00 88.36 188.21 6662.62 2099.36 S 3150.68 E 1212.37 84.71 41.89 31.12 308.83 8800.00 87.60 194.17 6666.16 2197.36 S 3131.30 E 1312.04 85.74 43.49 31.97 310.87 8816.65 87.48 195.16 6666.87 2213.45 S 3127.09 E 1328.67 85.92 43.77 32.12 311.22 9000.00 87.48 195.16 6674.95 2390.25 S 3079.18 E 1511.85 88.07 46.96 33.72 315.29 9171.13 87.48 195.16 6682.48 2555.26 S 3034.47 E 1682.81 90.49 49.99 35.26 319.39 9200.00 88.11 194.57 6683.59 2583.14 S 3027.07 E 1711.66 90.94 50.49 35.52 320.11 9285.55 90.00 192.83 6685.00 2666.23 S 3006.81 E 1797.17 92.43 51.86 36.30 322.22 9285.57 90.00 192.83 6685.00 2666.26 S 3006.81E 1797.19 92.43 51.86 36.30 322.22 9500.00 90.00 192.83 6685.00 2875.33 S 2959.18 E 2011.47 96.66 55.03 38.30 327.50 10000.00 90.00 192.83 6685.00 3362.84 S 2848.13 E 2511.11 109.10 60.78 43.08 338.49 10207.59 90.00 192.83 6685.00 3565.25 S 2802.02 E 2718.55 115.15 62.55 45.10 342.18 10207.61 90.00 192.83 6685.00 3565.27 S 2802.01 E 2718.57 115.15 62.55 45.10 342.18 10306.26 92.96 192.83 6682.45 3661.41 S 2780.11 E 2817.10 118.17 63.27 46.07 343.74 10500.00 92.96 192.83 6672.45 3850.06 S 2737.14 E 3010.45 124.31 64.54 47.99 346.47 10741.05 92.96 192.83 6660.00 4084.77 S 2683.67 E 3251.00 132.30 65.87 50.40 349.34 All data is in feet unless otherwise stated. Coordinates from slot #lA and TVD from rkb Pool #6 (80.00 Ft above mean sea level). Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead. Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit,North Slope. A1 aska Measured Inclin. Azimuth True Vert R E C T A N G Depth Degrees Degrees Depth C 0 0 R D I N 10741.07 92.96 192.83 6660.00 4084.79 S 10800.00 92.19 194.43 6657.35 4142.00 S 10900.00 90.89 197.13 6654.66 4238.19 S 11000.00 89.58 199.83 6654.26 4333.02 S 11017.99 89.34 200.32 6654.43 4349.92 S 11320.90 89.34 200.32 6657.90 4633.96 S 11400.00 90.19 202.53 6658.22 4707.60 S 11500.00 91.27 205.33 6656.94 4798.98 S 11568.09 92.00 207.24 6655.00 4860.00 S 11568.11 92.00 207.24 6655.00 4860.02 S 11600.00 92.96 207.24 6653.62 4888.35 S 11657.75 94.69 207.24 6649.77 4939.58 S 12000.00 94.69 207.24 6621.79 5242.85 S 12021.82 94.69 207.24 6620.00 5262.19 S 12021.84 94.69 207.24 6620.00 5262.21 S ULAR ATES 2683.66 2669.79 2642.61 2610.92 2604.74 2499.58 2470.69 2430.14 2400.00 2399.99 2385.41 2359.03 2202.91 2192.95 2192.94 PROPOSAL LISTING Page 2 Your ref : lA Version #10 Last revised : 25-0ct-1999 Vert Ellipse Semi Axes Minor Sect Major Minor Vert. Azi. E 3251.02 132.30 65.87 50.40 349.34 E 3309.88 134.31 66.20 50.99 350.01 E 3409.82 137.78 66.84 52.00 351.22 E 3509.62 141.32 67.56 53.00 352.49 E 3527.54 141.97 67.69 53.18 352.72 E 3829.13 153.21 69.63 56.25 356.11 E 3907.73 156.26 70.15 57.05 356.97 E 4006.49 160.20 70.90 58.07 358.13 E 4073.23 162.94 71.45 58.77 358.95 E 4073.26 162.95 71.45 58.77 358.95 E 4104.39 164.24 71.70 59.09 359.32 E 4160.70 166.61 72.13 59.68 359.96 E 4494.05 181.13 74.44 63.20 3.37 E 4515.31 182.09 74.57 63.42 3.57 E 4515.33 182.09 74.57 63.42 3.57 POSITION UNCERTAINTY SUMMARY Depth Position Uncertainty From To Survey Tool Error Model Major Minor Vert. 0 6498 ARCO (H.A. Gyro) User specified 65.44 26.96 21.62 6498 12022 ARCO (H.A. Mag) User specified 182.09 74.57 63.42 1. Ellipse dimensions are half axis. 2. Casing dimensions are not included. 3. E11 ipses are cal cul ated on 2.58 standard deviations. 4. Uncertainty calculations start at drill depth zero. 5. Surface position uncertainty is not included. 6. Where two surveys are tied together the errors of one are considered to have a systematic relationship to the corresponding errors of the other. 7. Detailed description of the INTEQ error models can be found in the Ec*Trak manual. All data is in feet unless otherwise stated. Coordinates from slot #lA and TVD from rkb Pool ~5 (80.00 Ft above mean sea level). Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead. Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R,1A Kuparuk River Unit,North Slope. Alaska PROPOSAL LISTING Page 3 Your ref : lA Version #10 Last revised : 25-0ct-1999 Comments in wellpath MD TVD Rectangul ar Coords. Comment 6776.72 7212.23 7310.99 7335.60 7371.39 7701.71 7760.28 8114.16 8114.18 8366.62 8366.66 8366.68 8489.20 8567.11 8567.13 8816.65 9171.13 9285.55 9285.57 10207.59 10207.61 10306.26 10741.07 11017.99 11320.90 11568.11 11657.75 12021.82 12021.84 5568.07 5987.00 6082.00 6105.67 6140 O0 6427 O0 6468 O0 6615 O0 6615 O0 6650 O0 6650 O0 6650 O0 6659 16 6660 O0 6660 O0 6666 87 6682 48 6685 O0 6685 O0 6685 O0 6685 O0 6682 45 6660 O0 6654 43 6657 90 6655 O0 6649 77 6620 O0 6620 O0 977.78 S 2898.10 E EOC 1012.25 S 3012.03 E C30 1020.06 S 3037.86 E C20 1022.01 S 3044.30 E Begin Build & Turn 1025.95 S 3053.59 E B/HRZ - T/Kalubik 1161.64 S 3126.72 E Top C 1202.33 S 3136.23 E Top B Shale 1516.93 S 3162.93 E Target #1 Top A4-1ROiA 1516.95 S 3162.93 E Target #1-Top A4/EOC 1766.95 S 3161.60 E Top A3 1766.96 S 3161.60 E Target#2 Top A3-1ROIA 1766.98 S 3161.60 E Target#2-Top A3/Begin Build 1889.07 S 3160.95 EEOC 1966.97 S 3160.54 E Target #3-A3 Tgt2 1ROiA 1966.99 S 3160.54 E Target#3-A3 t2/Begin Drop & Turn 2213.45 S 3127.09 E EOC 2555.26 S 3034.47 E Begin Build & Turn 2666.23 S 3006.81 E Target#4A3-Tgt3 1RO1A 2666.26 S 3006.81 E TargetS-A3 t3/EOC 3565.25 S 2802.02 E TargetS5 A4-Tgt2 1ROiA 3565.27 S 2802.01 E Target#5-A4 t2/Begin Build 3661.41 S 2780.11 E EOC 4084.79 S 2683.66 E Target~6-A3 UpThrn/Begin Drop&Turn 4349.92 S 2604.74 E EOC 4633.96 S 2499.58 E Begin Build&Turn 4860.02 S 2399.99 E Target #7-A3 UpThrn t2/Begin Build 4939.58 S 2359.03 EEOC 5262.19 S 2192.95 E Target#8-TD/Casing Pt 5262.21S 2192.94 E Target ~8 A4-Toe 1ROIA Casing positions in string 'A' Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing n/a 5328.57 939.61S 2766.39E 6498.00 5328.57 939.61S 2766.39E 7" Window n/a 5328.57 939.61S 2766.39E 12021.80 6620.00 5262.17S 2192.96E 3 1/2" Liner Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised Target#7A3-UpThrnT 542200.000~5986200.000,0.0000 Target#6 A3-UpThrn 542550.000.5987000.000,0.0000 Target #1 Top A4-1RO 543000.000.5989550.000,0.0000 Target#2 Top A3-1RO 543000.000 5989300.000,0.0000 Target#3-A3 Tgt2 1R 543000.000~5989100.000,0.0000 TargetS4 A3-Tgt3 1R 542850.000.5988400.000,0.0000 Target~S A4-Tgt2 1R 542650.000 5987500.000,0.0000 Target~t~ A4-Toe 1RO 542050.000 5985800.000,0.0000 6655.00 6660.00 6615.00 6650.00 6660.00 6685.00 6685.00 6620.00 4862.97S 4064 76S 1516 93S 1766 96S 1966 97S 2666 23S 3565 25S 5262.21S 2345.08E 20-Sep-1999 2699.36E 20-Sep-1999 3162.93E 9-Jun-1999 3161.60E 20-Sep-1999 3160.54E 20-Sep-1999 3006.81E 20-Sep-1999 2802.02E 20-Sep-1999 2192.94E 20-Sep-1999 ARCO Alaska, Inc. Pad 1R,1A Kuparuk River Unit,North Slope, Alaska PROPOSAL LISTING Page 1 Your ref : lA Version #10 Last revised : 23-0ct-1999 Measured Inclin Azimuth True Vert R E C TAN G U L A R Dogleg Vert G R I D C 0 0 R D S Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect Easting Northing 6498.00 43.73 105.90 5328,57 939.61S 2766.39E 0,00 191.60 6498.02 43,73 105,90 5328.58 939.61S 2766,40E 10.00 191.60 6500.00 43.53 105.90 5330.02 939.99S 2767.71E 10.00 191.62 6600.00 33.53 106.07 5408.15 957.11S 2827.52E 10.00 192.68 6700.00 23.53 106.37 5495.89 970.42S 2873.33E 10,00 193.68 542600.44 5990125.16 542600.45 5990125.15 542601.77 5990124.79 542661.66 5990107.98 542707.54 5990094.92 6776.72 15.86 106.83 5568.07 977.78S 2898.10E 10.00 194.38 7000.00 15.86 106.83 5782.85 995.45S 2956.51E 0.00 196.33 7212.23 15.86 106,83 5987.00 1012.25S 3012.03E 0.00 198.18 7310.99 15.86 106.83 6082.00 1020.06S 3037.86E 0.00 199.05 7335.60 15.86 106.83 6105.67 1022,01S 3044.30E 0.00 199.26 542732.34 5990087.69 542790.84 5990070.33 542846.44 5990053.83 542872.31 5990046.15 542878.76 5990044.24 7371.39 17,06 118.75 6140.00 1025.95S 3053.59E 10.00 200.67 542888.06 5990040.35 7400.00 18.46 126.95 6167.25 1030,69S 3060.89E 10.00 203.36 542895.39 5990035.64 7500.00 25.29 146.88 6260.12 1058.17S 3085.27E 10.00 223.59 542919.92 5990008.30 7600.00 33.66 158.10 6347.17 1101.89S 3107.34E 10.00 260.10 542942.22 5989964.71 7700.00 42.68 165.14 6425.74 1160.51S 3126,42E 10.00 311.79 542961.60 5989906.19 7701.71 42.84 165.24 6427.00 1161.64S 3126.72E 10.00 312.80 542961.91 5989905.06 7760.28 48.27 168.30 6468.00 1202.33S 3136,23E 10.00 349.65 542971.63 5989864.43 7800.00 52.00 170,09 6493.45 1232.27S 3141.93E 10,00 377.09 542977.49 5989834.52 7900.00 61.48 173.91 6548,25 1314.98S 3153.40E 10.00 454.01 542989.40 5989751.88 8000.00 71.05 177,09 6588,46 1406.12S 3160.48E 10.00 540.22 542996.96 5989660.79 8100.00 80.67 179.92 6612.87 1502.94S 3162.96E 10.00 633,09 542999,95 5989564.00 8114.16 82.03 180.30 6615.00 1516.93S 3162.93E 10.00 646.62 543000.00 5989550.00 8114.18 82,03 180.30 6615.00 1516.95S 3162.93E 0.00 646.64 543000.00 5989549.98 8134,66 82.03 180.30 6617.84 1537.24S 3162.82E 0.00 666.26 543000.00 5989529.70 8234.66 82.03 180.30 6631,71 1636,27S 3162.30E 0.00 762.06 543000.00 5989430.67 8334.66 82.03 180.30 6645,57 1735.31S 3161.77E 0.00 857.85 543000.00 5989331.65 8366.62 82.03 180.30 6650.00 1766.95S 3161.60E 0.00 888.46 543000.00 5989300.00 8366.66 82.03 180.30 6650.00 1766.96S 3161.60E 0,00 888.47 543000.00 5989300.00 8366.68 82.03 180.30 6650.00 1766.98S 3161.60E 6.00 888.49 543000.00 5989299.98 8399.45 84.00 180.30 6653.99 1799.50S 3161,43E 6.00 919.95 543000.00 5989267.45 8489.20 89.38 180,30 6659.16 1889.07S 3160.95E 6.00 1006.58 543000.00 5989177.90 8500.00 89.38 180.30 6659.28 1899.87S 3160.90E 0.00 1017,03 543000.00 5989167.10 8567.11 89.38 180.30 6660.00 1966.97S 3160.54E 0.00 1081.94 543000.00 5989100.00 8567.13 89.38 180.31 6660.00 1966.99S 3160.54E 6.00 1081.96 543000.00 5989099.98 8600.00 89.13 182.26 6660,43 1999.85S 3159.80E 6.00 1113.89 542999.44 5989067.12 8700.00 88.36 188.21 6662.62 2099.36S 3150.68E 6.00 1212.37 542990.85 5988967.57 8800.00 87.60 194.17 6666.16 2197.36S 3131.30E 6.00 1312.04 542971.99 5988869.49 8816.65 87.48 195.16 6666.87 2213.45S 3127.09E 6.00 1328.67 542967.86 5988853.38 9000.00 87.48 195,16 6674.95 2390.25S 3079,18E 0.00 1511.85 542920.90 5988676.34 9171.13 87.48 195,16 6682.48 2555.26S 3034.47E 0.00 1682,81 542877.07 5988511.11 9200.00 88.11 194.57 6683.59 2583.14S 3027.07E 3.00 1711.66 542869.82 5988483.19 9285,55 90.00 192.83 6685.00 2666.23S 3006.81E 3.00 1797.17 542850.00 5988400.00 9285.57 90.00 192.83 6685.00 2666.26S 3006.81E 0.93 1797.19 542849.99 5988399.98 9500.00 90.00 192.83 6685.00 2875.33S 2959.18E 0.00 2011.47 542803.48 5988190.67 10000.00 90,00 192.83 6685.00 3362.84S 2848.13E 0,00 2511.11 542695.03 5987702.63 10207.59 90.00 192.83 6685.00 3565.25S 2802.02E 0.00 2718.55 542650.00 5987500.00 10207.61 90.00 192.83 6685.00 3565.27S 2802.01E 3.00 2718.57 542650.00 5987499.98 10306,26 92.96 192.83 6682.45 3661.41S 2780.11E 3.00 2817.10 542628.61 5987403.74 10500.00 92.96 192.83 6672.45 3850.06S 2737.14E 0,00 3010.45 542586.64 5987214.88 10741.05 92.96 192.83 6660,00 4084.77S 2683.67E 0.00 3251,00 542534.42 5986979.91 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #lA and TVD from rkb Pool ~6 (80.00 Ft above mean sea level). Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead. Total Dogleg for wellpath is 152,86 degrees. Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hugh~s INTEQ ARCO Alaska, Inc. Pad 1R,1A Kuparuk River Unit,North Slope, Alaska PROPOSAL LISTING Page 2 Your ref : lA Version #10 Last revised : 23-0ct-1999 Measured Inclin Azimuth True Vert R E C TAN G U L A R Dogleg Vert G R I D C 0 0 R D S Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect Easting Northing 10741.07 92.96 192.83 6660.00 4084.79S 2683.66E 3.00 3251.02 542534.42 5986979.89 10800.00 92.19 194.43 6657.35 4142.00S 2669.79E 3.00 3309.88 542520.85 5986922.61 10900.00 90.89 197.13 6654.66 4238.19S 2642.61E 3.00 3409.82 542494.18 5986826.29 11000.00 89.58 199.83 6654.26 4333.02S 2610.92E 3.00 3509.62 542463.00 5986731.30 11017.99 89.34 200.32 6654.43 4349.92S 2604.74E 3.00 3527.54 542456.91 5986714.37 11320.90 89.34 200.32 6657.90 4633.96S 2499.58E 0.00 3829.13 11400.00 90.19 202.53 6658.22 4707.60S 2470.69E 3.00 3907.73 11500.00 91.27 205.33 6656.94 4798.98S 2430.14E 3.00 4006.49 11568.09 92.00 207.24 6655.00 4860.00S 2400.00E 3.00 4073.23 11568.11 92.00 207.24 6655.00 4860.02S 2399.99E 3.00 4073.26 11600.00 92.96 207.24 6653.62 4888.35S 2385.41E 3.00 4104.39 11657.75 94.69 207.24 6649.77 4939.58S 2359.03E 3.00 4160.70 12000.00 94.69 207.24 6621.79 5242.85S 2202.91E 0.00 4494.05 12021.82 94.69 207.24 6620.00 5262.19S 2192.95E 0.00 4515.31 12021.84 94.69 207.24 6620.00 5262.21S 2192.94E 0.00 4515.33 542353.27 5986429.80 542324.78 5986356.02 542284.71 5986264.43 542254.90 5986203.26 542254.89 5986203.24 542240.46 5986174.84 542214.36 5986123.48 542059.86 5985819.40 542050.01 5985800.02 542050.00 5985800.00 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #lA and TVD from rkb Pool #6 (80.00 Ft above mean sea level). Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead. Total Dogleg for wellpath is 152.86 degrees. Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hugh~s INTEQ ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit. North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : lA Version #10 Last revised : 23-0ct-1999 Comments in wellpath MD TVD Rectangular Coords. Comment 6498.02 5328.58 939 6776.72 5568.07 977 7212.23 5987.00 1012 7310.99 6082.00 1020 7335.60 6105.67 1022 7371.39 6140.00 1025 7701.71 6427.00 1161 7760.28 6468.00 1202 8114.16 6615.00 1516 8114.18 6615.00 1516 8366.62 6650.00 1766 8366.66 6650.00 1766 8366.68 6650.00 1766 8489.20 6659.16 1889 8567.11 6660.00 1966 8567.13 6660.00 1966 8816.65 6666.87 2213 9171.13 6682.48 2555 9285.55 6685.00 2666 9285.57 6685.00 2666 10207.59 6685.00 3565 10207.61 6685.00 3565 10306.26 6682.45 3661 10741.07 6660.00 4084 11017.99 6654.43 4349 11320.90 6657.90 4633 11568.11 6655.00 4860 11657.75 6649.77 4939 12021.82 6620.00 5262 12021.84 6620.00 5262 .61S 2766.40E Sidetrack Point .78S 2898.10E EOC .25S 3012.03E C30 .06S 3037.86E C20 .01S 3044.30E Begin Build & Turn .95S 3053.59E B/HRZ - T/Kalubik .64S 3126.72E Top C .33S 3136.23E Top B Shale 93S 3162.93E Target #1 Top A4-1ROIA 95S 3162.93E Target #1-Top A4/EOC 95S 3161.60E Top A3 96S 3161.60E Target#2 Top A3-1ROiA 98S 3161.60E Target#2-Top A3/Begin Build 07S 3160.95E EOC 97S 3160.54E Target #3-A3 Tgt2 1RO1A 99S 3160.54E Target#3-A3 t2/Begin Drop & Turn 45S 3127.09E EOC 26S 3034.47E Begin Build & Turn 23S 3006.81E Target#4A3-Tgt3 1RO1A 26S 3006.81E Target ~4-A3 t3/EOC 25S 2802.02E Target~5A4-Tgt2 1RO1A 27S 2802.01E Target #5-A4 t2/Begin Build .41S 2780.11E EOC 79S 2683.66E Target~6-A3 UpThrn/Begin Drop&Turn 92S 2604.74E EOC 96S 2499.58E Begin Build&Turn 02S 2399.99E Target #7-A3 UpThrn t2/Begin Build 58S 2359.03E EOC 19S 2192.95E Target#8-TD/Casing Pt 21S 2192.94E Target#8A4-Toe 1ROiA Casing positions in string 'A' Top MD Top TVD Rectangular Coords. Bot MD BotTVD Rectangular Coords. Casing n/a 5328.57 939.61S 2766,39E 6498.00 5328.57 939.61S 2766.39E 7" Window n/a 5328.57 939.61S 2766.39E 12021.80 6620.00 5262.17S 2192.96E 3 1/2" Liner Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised Target #7 A3-UpThrnT 542200 000 5986200.000,0.0000 Target~15 A3-UpThrn 542550 000 5987000.000,0.0000 Target #1 Top A4-1RO 543000 000 5989550.000,0.0000 Target#2 Top A3-1RO 543000 000 5989300.000,0.0000 Target#3-A3 Tgt2 1R 543000 000 5989100.000,0.0000 Target ~4 A3-Tgt3 1R 542850 000 5988400.000,0.0000 Target ~qS A4-Tgt2 1R 542650 000 5987500.000.0.0000 Targeted8 A4-Toe 1RO 542050 000 5985800.000,0.0000 6655.00 6660.00 6615.00 6650.00 6660.00 6685.00 6685.00 6620.00 4862 97S 4064 76S 1516 93S 1766 96S 1966 97S 2666 23S 3565 25S 5262.21S 2345.08E 20-Sep-1999 2699.36E 20-Sep-1999 3162.93E 9-Jun-1999 3161.60E 20-Sep-1999 3160.54E 20-Sep-1999 3006.81E 20-Sep-1999 2802.02E 20-Sep-1999 2192.94E 20-Sep-1999 ARCO Alaska, Inc. Pad 1R lA slot #lA Kuparuk River Unit North Slope, A1 aska 3-D MINIMUM DISTANCE CLEARANCE REPORT INCLUDING POSITION UNCERTAINTIES by Baker Hughes INTEQ Your ref : lA Version #10 Our ref : prop3679 License : Date printed : 23-0ct-1999 Date created : 22-0ct-1999 Last revised : 23-0ct-1999 Field is centred on n70 16 18.576,w150 5 56,536 Structure is centred on n70 23 12.884,w149 40 37.889 Slot location is n70 23 11.369,w149 40 33.820 Slot Grid coordinates are N 5991049.979, E 539829.377 Slot local coordinates are 154.00 S 139.00 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Report is limited to clearances less than 2000 feet Proximities will incorporate ellipses - when survey tools are defined for both wells. Ellipse separation in reverse brackets, e.g. )10.2(, where available DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4* Object wellpath PMSS <0-6755'>,,17,Pad 1G MMS <6350 - 7760'>,,10A,Pad 1G PMSS <6390 - 7906'>,,10A,Pad 1G PGMS <0-7970'>,,lO,Pad 1G PGMS <0-9225'>,,16,Pad 1G GMS <0-7415'>,,4,Pad 1G GMS <0-8489'>,,3,Pad 1G GMS <0-10086'>,,5,Pad 1G PMSS <2156-2674'>,,6,Pad 1G GMS <0-9250'>,,6A,Pad 1G PGMS <0-8851'>,,7,Pad 1G PGMS <O-8715'>,,8A,Pad 1G PMSS <2232-3720'>,,8,Pad 1G PGMS <0-8360'>,,9,Pad 1G PGMS <0-8208'>,,11,Pad 1G PGMS <O-9116'>,,12,Pad 1G PGMS <0-8110'>,,13,Pad 1G PGMS <0-7950'>,,14,Pad 1G PGMS <0-7533'>,,15,Pad 1G Closest approach with 3- Last revised lO-Aug-1999 2-Feb-1999 8-Sep-1996 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 11-Dec-1992 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 Distance )6173.5( )4148 6( )4146 1( )3830 6( )5541 5( )3980 O( )5969 8( )6641 1( )6391 6( )6436 4( )1637 8( )3655 3( )4923 1( )1322 9( )6128 3( )6916 9( )7460 6( )5921 4( )5O55 O( D Minimum Distance method M.D. Diverging from M.D. 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021,8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 MSS <1651-2529'> ,2, 1G GMS <0-9754'>, 2A, Pact- 1G GMS <0-7970'>, 1, Pad PGMS <0 - 10180'> PGMS <0-7530'> PGMS <0-9310'> PGMS <0-8440 '> PGMS <0-8775'> PGMS <0-9303'> PGMS <0- 7182'> PGMS <0-8570'> PGMS <0-8225'> PGMS <0-8800 > PGMS <0-7295 > PGMS <0-8570 > PGMS <0-9250 > PGMS <0-7420 > PGMS <0-8450 > PMSS <0:5350 > PGMS <0-10215'> 21,Pad 1R 3,Pad 1R 2,Pad 1R 4 Pad 1R 5 Pad 1R 6 Pad 1R 7 Pad 1R 8 Pad 1R 9 Pad 1R 10 Pad 1R 11'Pad 1R 13 Pad 1R 14 Pad 1R 15 Pad 1R 16 Pad 1R ,18 Pad 1R ,,26,Pad 1R PMSS <6970 - 12972'>,,24,Pad 1R PGMS <O-12180'>,,23,Pad 1R PGMS <0-10080'>,,20,Pad 1R PGMS <0-9838'>,,19,Pad 1R PGMS <0-11368'>,,29,Pad 1R PGMS <0-12388'>,,27,Pad 1R PGMS <0-10345'>,,17,Pad 1R PGMS <0-10295'>,,25,Pad 1R PGMS <0-8320'>,,12,Pad 1R PGMS <0-3991'>,,U SWPT1,Pad 1R PMSS <473-11428'>,,32,Pad 1R PMSS <O-15530'>,,33,Pad 1R PMSS <741-13570'>,,34,Pad 1R PMSS <645-12647'>,,31,Pad 1R MSS <0-9775'>,,E UGNU #1,Pad 1R PGMS <0-8570'>,,1,Pad 1R PGMS <0-10810'>,,22,Pad 1R PGMS<O-8568'>Depth Shifted,,1A,Pad 1R 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 lO-Apr-1991 2-Feb-1999 2-Feb-1999 22-0ct-1999 )69~5 )6954 )5660 )4675 ) 1759 6 ( )996 2( )1175 5( )3623 4( )4570.0 ( )3762.3( )4032.6( )4340.4( )5105.1( )3411.0( )3476.8( )3504.0( ) 2808.1( )1818.8( )5136.9( )1259.0( )2314.1( ) 3873.1( )4445.9( )4783.7( )1847.9( )1850.3( )5375.1( )1976.2( )4124.3( )10102.9 )5120.5( ) 5028.1( )4734.5( )5186.2( )5914.5( )0.0( )3357.4( )0.0( 4( 12021. 2( 12021 ~ 8( 12021 8 6( 6498 0 8031 3 9528 0 11148 0 12021 8 6498 0 6498 0 6498 0 6498 0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6757.5 6498.0 6757.5 12021.8 12021.8 12021.8 6498.0 8366.7 9528.0 11148.0 12021.8 12021.8 9087.0 10677.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 9936.0 7038.0 11253.0 9909.0 9297.0 6498.0 6498.0 6498.0 6498.0 6498.0 9147.0 6498.0 6498.0 11031.0 6498.0 6757.5 12015.0 6757.5 ARCO Alaska, Inc. Pad iR, lA Kuparuk River Unit,North Slope, Alaska CLEARANCE LISTING Page 2 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference wellpath Object wellpath : PGMS <0-8851'>,,7,Pad 1G M.D. T.V.D. Hori z Mi n'm E11 i pse Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 11200.0 11300.0 11400.0 11500.0 11600.0 6656.5 6657.7 6658.2 6656.9 6653.6 4520.6S 2541.6E 8299.9 6635.8 6463.8S 3975.6E 143.6 2415.1 )1981.8( 4614.4S 2506.8E 8250.9 6601.6 6484.5S 3947.4E 142.4 2361.3 )1925.4( 4707.6S 2470.7E 8187.9 6557.4 6511.0S 3911.2E 141.4 2310.3 )1873.0( 4799.0S 2430.1E 8122.8 6511.3 6538.1S 3874.0E 140.3 2265.0 )1826.1( 4888.3S 2385.4E 8052.4 6461.1 6567.0S 3833.9E 139.2 2225.6 )1785.3( 11700.0 11800.0 11900.0 12000.0 6646.3 6638.1 6630.0 6621.8 4977.0S 2339.8E 7970.1 6401.9 6599.9S 3787.3E 138.3 2188.3 )1748.0( 5065.6S 2294.1E 7899.3 6350.4 6627.7S 3747.3E 137.1 2152.8 )1711.5( 5154.2S 2248.5E 7835.8 6303.8 6652.1S 3711.8E 135.7 2119.2 )1676.4( 5242.9S 2202.9E 7776.9 6260.0 6674.5S 3679.3E 134.1 2088.1 )1643.5( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #lA and la~D from rkb Pool #6 (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit,North Slope, Alaska CLEARANCE LISTING Page 3 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference wellpath Object wellpath : PGMS <0-8360'>,,9,Pad 1G M.D. T.V.D. Rect Coordinates Horiz Min'm Ellipse M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 11400.0 6658.2 11500.0 6656.9 11600.0 6653.6 11700.0 6646.3 11800.0 6638.1 4707.6S 4799.0S 4888.3S 4977.0S 5065.6S 2470.7E 8360.0 6935.5 2430.1E 8360.0 6935.5 2385.4E 8360.0 6935.5 2339.8E 8360.0 6935.5 2294.1E 8360.0 6935.5 6269.2S 925.2E 224.7 2214.6 )1918.0( 6269.2S 925.2E 225.7 2122.3 )1821.1( 6269.2S 925.2E 226.6 2029.4 )1723.9( 6269.2S 925.2E 227.6 1937.7 )1627.7( 6269.2S 925.2E 228.7 1846.9 )1532.3( 11900.0 6630.0 12000.0 6621.8 5154.2S 2248.5E 8360.0 6935.5 6269.2S 5242.9S 2202.9E 8360.0 6935.5 6269.2S 925.2E 229.9 1757.2 )1437.4( 925.2E 231.2 1668.7 )1343.2( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #lA and TVD from rkb Pool ~ (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ M.D. 6500.0 6600.0 6700.0 6800.0 6900.0 7000.0 7100.0 7200.0 7300.0 7400.0 7500.0 7600.0 7700.0 7800.0 7900.0 8000.0 8100.0 8200.0 8300.0 8400.0 8500.0 8600.0 8700.0 88OO.0 8900.0 9000.0 9100.0 9200.0 ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit. North Slope, Alaska CLEARANCE LISTING Page 4 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference wellpath Object wellpath : PGMS <0-7530'>,,3,Pad 1R Horiz Min'm Ellipse T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 5330.0 940.0S 2767.7E 6864.2 6385.2 1132.1S 1012.9E 263.8 2056.7 )1987.0( 5408.1 957.1S 2827.5E 6956.6 6453.9 1173.9S 1058.6E 263.0 2066.3 )1994.8( 5495.9 970.4S 2873.3E 7047.0 6521.0 1214.7S 1103.2E 262.1 2060.1 )1986.7( 5590.5 979.6S 2904.2E 7126.5 6580.4 1250.4S 1142.2E 261.3 2039.1 )1963.8( 5686.7 987.5S 2930.3E 7212.3 6644.6 1288.9S 1184.1E 260.2 2014.4 )1937.1( 5782.8 995.5S 2956.5E 7296.8 6707.8 1326.9S 1225.3E 259.2 1990.6 )1911.2( 5879.0 1003.4S 2982.7E 7380.3 6770.5 1364.5S 1265.8E 258.1 1967.9 )1886.4( 5975.2 1011.3S 3008.8E 7467.9 6836.3 1403.7S 1308.2E 257.0 1946.2 )1862.4( 6071.4 1019.2S 3035.0E 7530.0 6883.0 1431.6S 1338.3E 256.3 1925.5 )1839.8( 6167.3 1030.7S 3060.9E 7530.0 6883.0 1431.6S 1338.3E 256.9 1908.0 )1821.2( 6260.1 1058.2S 3085.3E 7530.0 6883.0 1431.6S 1338.3E 257.9 1891.9 )1804.4( 6347.2 1101.9S 3107.3E 7530.0 6883.0 1431.6S 1338.3E 259.4 1877.6 )1789.7( 6425.7 1160.5S 3126.4E 7530.0 6883.0 1431.6S 1338.3E 261.4 1865.5 )1777.6( 6493.5 1232.3S 3141.9E 7530.0 6883.0 1431.6S 1338.3E 263.7 1856.0 )1768.5( 6548.2 1315.0S 3153.4E 7530.0 6883.0 1431.6S 1338.3E 266.3 1849.4 )1762.5( 6588.5 1406.1S 3160.5E 7530.0 6883.0 1431.6S 1338.3E 269.2 1846.0 )1759.8( 6612.9 1502.9S 3163.0E 7530.0 6883.0 1431.6S 1338.3E 272.2 1846.0 )1760.4( 6626.9 1601.9S 3162.5E 7530.0 6883.0 1431.6S 1338.3E 275.3 1850.0 )1765.0( 6640.8 1701.0S 3162.0E 7530.0 6883.0 1431.6S 1338.3E 278.4 1859.3 )1774.9( 6654.0 1800.0S 3161.4E 7530.0 6883.0 1431.6S 1338.3E 281.4 1874.1 )1790.0( 6659.3 1899.9S 3160.9E 7530.0 6883.0 1431.6S 1338.3E 284.4 1895.1 )1811.1( 6660.4 1999.8S 3159.8E 7530.0 6883.0 1431.6S 1338.3E 287.3 1921.1 )1837.1( 6662.6 2099.4S 3150.7E 7530.0 6883.0 1431.6S 1338.3E 290.2 1944.1 )1859.9( 6666.2 2197.4S 3131.3E 7530.0 6883.0 1431.6S 1338.3E 293.1 1961.7 )1877.2( 6670.5 2293.8S 3105.3E 7530.0 6883.0 1431.6S 1338.3E ~96.0 1977.6 )1892.5( 6674.9 2390.2S 3079.2E 7530.0 6883.0 1431.6S 1338.3E 298.8 1998.3 )1912.3( 6679.3 2486.7S 3053.1E 7530.0 6883.0 1431.6S 1338.3E 301.6 2023.7 )1936.6( 6683.6 2583.1S 3027.1E 7530.0 6883.0 1431.6S 1338.3E 304.3 2053.8 )1965.4( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #lA and TVD from rkb Pool ~15 (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska. Inc. Pad 1R. lA Kuparuk Ri ver Unit. North S1 ope. A1 aska CLEARANCE LISTING Page 5 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference wel 1 path Object wellpath : PGMS <0-9310'>,.2.Pad 1R M.D. T.V.D. Rect Coordinates M.D. T.V.D. Hori z Mi n' m E11 i pse Rect Coordi nates Bearing Di st Sep' n 6500.0 5330.0 6600.0. 5408.1 6700.0 5495.9 6800.0 5590.5 6900.0 5686.7 940.0S 2767.7E 5951.3 4623.6 1861.8S 2727.3E 182.5 1162.1 )1060.0( 957.1S 2827.5E 6049.9 4688.1 1913.4S 2781.0E 182.8 1198.0 )1093.4( 970.4S 2873.3E 6141.8 4748.7 1961.4S 2830.9E 182.5 1241.8 )1135.9( 979.6S 2904.2E 6229.7 4806.8 2007.0S 2878.4E 181.4 1292.4 )1186.2( 987.5S 2930.3E 6316.7 4864.6 2052.1S 2925.2E 180.3 1345.0 )1238.6( 7000.0 5782.8 995.5S 2956.5E 6405.7 4924.0 2098.0S 2973.0E 179.1 1397.7 )1291.0( 7100.0 5879.0 1003.4S 2982.7E 6497.6 4985.7 2145.1S 3022.3E 178.0 1450.3 )1343.1( 7200.0 5975.2 1011.3S 3008.8E 6585.0 5044.6 2189.5S 3069.1E 177.1 1502.6 )1395.2( 7300.0 6071.4 1019.2S 3035.0E 6662.7 5097.1 2228.9S 3110.6E 176.4 1555.1 )1447.5( 7400.0 6167.3 1030.7S 3060.9E 6737.4 5147.4 2267.2S 3150.4E 175.9 1605.3 )1497.8( 7500.0 6260.1 1058.2S 3085.3E 6797.9 5187.7 2299.2S 3182.3E 175.5 1643.1 )1536.4( 7600.0 6347.2 1101.9S 3107.3E 6865.3 5232.1 2335.6S 3217.7E 174.9 1666.6 )1561.1( 7700.0 6425.7 1160.5S 3126.4E 6953.6 5289.6 2383.7S 3264.2E 173.6 1675.1 )1570.5( 7800.0 6493.5 1232.3S 3141.9E 7048.1 5351.3 2435.3S 3313.9E 171.9 1667.8 )1564.3( 7900.0 6548.2 1315.0S 3153.4E 7131.9 5406.0 2481.0S 3357.9E 170.1 1645.1 )1543.2( 8000.0 6588.5 1406.1S 3160.5E 7200.6 5450.5 2518.7S 3394.2E 168.1 1608.5 )1509.0( 8100.0 6612.9 1502.9S 3163.0E 7272.7 5497.2 2558.4S 3432.2E 165.7 1559.3 )1462.1( 8200.0 6626.9 1601.9S 3162.5E 7336.0 5538.3 2593.4S 3465.4E 163.0 1503.3 )1408.9( 8300.0 6640.8 1701.0S 3162.0E 7397.7 5578.3 2627.5S 3497.7E 160.1 1449.2 )1357.6( 8400.0 6654.0 1800.0S 3161.4E 7460.2 5618.8 2662.2S 3530.4E 156.8 1396.8 )1308.1( 8500.0 6659.3 1899.9S 3160.9E 7517.4 5655.8 2693.8S 3560.3E 153.3 1340.5 )1254.5( 8600.0 6660.4 1999.8S 3159.8E 7572.9 5691.7 2724.5S 3589.4E 149.3 1283.8 )1200.4( 8700.0 6662.6 2099.4S 3150.7E 7625.3 5725.5 2753.5S 3616.9E 144.5 1234.3 )1153.1( 8800.0 6666.2 2197.4S 3131.3E 7674.7 5757.6 2780.8S 3642.9E 138.8 1194.8 )1115.1( 8900.0 6670.5 2293.8S 3105.3E 7720.2 5787.1 2805.8S 3666.7E 132.4 1165.2 )1085.5( 9000.0 6674.9 2390.2S 3079.2E 7765.4 5816.6 2830.5S 3690.4E 125.8 1142.0 )1060.5( 9100.0 6679.3 2486.7S 3053.1E 7808.9 5845.1 2854.3S 3713.3E 119.1 1125.6 )1040.1( 9200.0 6683.6 2583.1S 3027.1E 7851.3 5872.8 2877.5S 3735.4E 112.6 1116.1 )1024.5( 9300.0 6685.0 2680.3S 3003.6E 7893.3 5900.3 2900.4S 3757.3E 106.3 1110.1 )1010.6( 9400.0 6685.0 2777.8S 2981.4E 7937.2 5929.1 2924.6S 3780.1E 100.4 1109.5 )1000.4( 9500.0 6685.0 2875.3S 2959.2E 7982.8 5959.0 2949.6S 3803.7E 95.0 1116.2 )996.3( 9600.0 6685.0 2972.8S 2937.0E 8028.9 5989.3 2975.1S 3827.4E 90.1 1130.0 )998.6( 9700.0 6685.0 3070.3S 2914.8E 8075.2 6019.8 3000.5S 3851.1E 85.7 1150.7 )1007.5( 9800.0 6685.0 3167.8S 2892.5E 8119.8 6049.4 3025.0S 3873.9E 81.7 1177.9 )1023.0( 9900.0 6685.0 3265.3S 2870.3E 8162.6 6077.8 3048.3S 3895.7E 78.0 1211.2 )1045.3( 10000.0 6685.0 3362.8S 2848.1E 8205.4 6106.4 3071.6S 3917.5E 74.8 1250.3 )1074.0( 10100.0 6685.0 3460.3S 2825.9E 8248.1 6134.9 3094.7S 3939.2E 71.8 1294.5 )1108.7( 10200.0 6685.0 3557.8S 2803.7E 8289.2 6162.6 3116.8S 3960.1E 69.1 1343.4 )1149.0( 10300.0 6682.8 3655.3S 2781.5E 8330.2 6190.3 3138.7S 3981.0E 66.7 1395.8 )1193.5( 10400.0 6677.6 3752.7S 2759.3E 8369.6 6217.0 3159.7S 4000.9E 64.5 1451.0 )1241.8( 10500.0 6672.4 3850.1S 2737.1E 8407.3 6242.6 3179.7S 4020.0E 62.4 1509.9 )1294.5( 10600.0 6667.3 3947.4S 2715.0E 8444.0 6267.7 3199.1S 4038.5E 60.5 1572.1 )1351.3( 10700.0 6662.1 4044.8S 2692.8E 8479.7 6292.1 3217.9S 4056.5E 58.8 1637.2 )1411.8( 10800.0 6657.4 4142.0S 2669.8E 8515.4 6316.6 3236.6S 4074.5E 57.2 1705.6 )1476.0( 10900.0 6654.7 4238.2S 2642.6E 8550.3 6340.5 3254.9S 4092.1E 55.8 1779.5 )1546.4( 11000.0 6654.3 4333.0S 2610.9E 8583.7 6363.5 3272.4S 4109.0E 54.7 1858.4 )1622.3( 11100.0 6655.4 4426.8S 2576.3E 8617.7 6386.8 3290.2S 4126.1E 53.7 1940.6 )1701.8( 11200.0 6656.5 4520.6S 2541.6E 8650.2 6409.1 3307.3S 4142.5E 52.8 2024.0 )1782.8( 11300.0 6657.7 4614.4S 2506.8E 8682.7 6431.4 3324.3S 4158.9E 52.0 2108.2 )1864.8( 11400.0 6658.2 4707.6S 2470.7E 8718.7 6456.1 3343.2S 4176.9E 51.4 2194.0 )1948.4( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #lA and TVD from rkb Pool #6 (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ M.D. 9300.0 9400.0 9500.0 9600.0 97OO.O 98OO.0 9900.0 10000.0 10100.0 10200.0 10300.0 10400.0 10500.0 10600.0 10700.0 10800.0 10900.0 11000.0 11100.0 11200.0 11300.0 11400.0 11500.0 11600.0 11700.0 11800.0 11900.0 12000.0 ARCO Alaska, Inc. Pad 1R.1A Kuparuk River Unit,North Slope, Alaska Reference wel 1 path CLEARANCE LISTING Page 6 Your ref : lA Version #10 Last revised : 23-0ct-1999 Object wellpath : PGMS <O-8440'>,,4.Pad 1R Horiz Min'm Ellipse T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 6685.0 2680.3S 3003.6E 7899.2 6445.4 3709.1S 1144.0E 241.0 2138.7 )1967.6( 6685.0 2777.8S 2981.4E 7949.5 6483.2 3740.0S 1156.1E 242.2 2073.2 )1898.9( 6685.0 2875.3S 2959.2E 7998.8 6520.4 3770.2S 1167.8E 243.5 2009.2 )1831.6( 6685.0 2972.8S 2937.0E 8056.0 6563.7 3805.0S 1181.2E 244.6 1946.8 )1765.6( 6685.0 3070.3S 2914.8E 8110.6 6605.5 3837.9S 1193.9E 246.0 1885.9 )1701.3( 6685.0 3167.8S 2892.5E 8162.9 6645.6 3869.2S 1206.0E 247.4 1826.9 )1638.9( 6685.0 3265.3S 2870.3E 8212.2 6683.7 3898.4S 1217.3E 249.0 1770.1 )1578.6( 6685.0 3362.8S 2848.1E 8258.6 6719.7 3925.8S 1227.7E 250.8 1715.8 )1520.9( 6685.0 3460.3S 2825.9E 8307.6 6757.9 3954.4S 1238.4E 252.7 1664.2 )1466.0( 6685.0 3557.8S 2803.7E 8359.6 6798.6 3984.7S 1249.8E 254.6 1615.5 )1414.1( 6682.8 3655.3S 2781.5E 8409.9 6838.0 4014.0S 1260.7E 256.7 1570.2 )1365.9( 6677.6 3752.7S 2759.3E 8440.0 6861.6 4031.6S 1267.2E 259.4 1529.0 )1322.2( 6672.4 3850.1S 2737.1E 8440.0 6861.6 4031.6S 1267.2E 263.0 1493.1 )1284.4( 6667.3 3947.4S 2715.0E 8440.0 6861.6 4031.6S 1267.2E 266.7 1463.1 )1253.1( 6662.1 4044.8S 2692.8E 8440.0 6861.6 4031.6S 1267.2E 270.5 1439.5 )1228.8( 6657.4 4142.0S 2669.8E 8440.0 6861.6 4031.6S 1267.2E 274.5 1421.6 )1211.0( 6654.7 4238.2S 2642.6E 8440.0 6861.6 4031.6S 1267.2E 278.5 1406.1 )1196.2( 6654.3 4333.0S 2610.9E 8440.0 6861.6 4031.6S 1267.2E 282.6 1392.6 )1184.0( 6655.4 4426.8S 2576.3E 8440.0 6861.6 4031.6S 1267.2E 286.8 1382.9 )1176.4( 6656.5 4520.6S 2541.6E 8440.0 6861.6 4031.6S 1267.2E 291.0 1380.2 )1176.6( 6657.7 4614.4S 2506.8E 8440.0 6861.6 4031.6S 1267.2E 295.2 1384.9 )1184.8( 6658.2 4707.6S 2470.7E 8440.0 6861.6 4031.6S 1267.2E 299.3 1395.2 )1199.2( 6656.9 4799.0S 2430.1E 8440.0 6861.6 4031.6S 1267.2E 303.4 1408.2 )1216.5( 6653.6 4888.3S 2385.4E 8440.0 6861.6 4031.6S 1267.2E 307.5 1423.9 )1236.8( 6646.3 4977.0S 2339.8E 8440.0 6861.6 4031.6S 1267.2E 311.4 1445.8 )1263.4( 6638.1 5065.6S 2294.1E 8440.0 6861.6 4031.6S 1267.2E 315.2 1474.3 )1296.6( 6630.0 5154.2S 2248.5E 8440.0 6861.6 4031.6S 1267.2E 318.8 1508.9 )1335.8( 6621.8 5242.9S 2202.9E 8440.0 6861.6 4031.6S 1267.2E 322.3 1549.2 )1380.3( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #lA and TVD from rkb Pool #6 (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ M,D, 6500.0 6600.0 6700.0 6800.0 6900.0 7000.0 7100.0 7200.0 7300.0 7400.0 7500.0 ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit,North Slope, Alaska CLEARANCE LISTING Page 7 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference wel 1 path Object wellpath : PGMS <0-8450'>,,16,Pad 1R Horiz Min'm Ellipse T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 5330.0 940.0S 2767.7E 6312.9 5387.2 962.6N 2428.0E 349.9 1933.5 )1819.4( 5408.1 957.1S 2827.5E 6413.6 5456.2 973.3N 2500.6E 350.4 1958.5 )1841.8( 5495.9 970.4S 2873.3E 6504.7 5518.4 982.9N 2566.5E 351.1 1977.4 )1858.3( 5590.5 979.6S 2904.2E 6588.6 5575.5 991.9N 2627.3E 352.0 1990.9 )1869.6( 5686.7 987.5S 2930.3E 6673.3 5633.2 1000.9N 2688.6E 353.1 2003.8 )1880.3( 5782.8 995.5S 2956.5E 6764.2 5695.2 1010.5N 2754.3E 354.2 2018.0 )1892,2( 5879.0 1003.4S 2982.7E 6852.8 5755.8 1019.5N 2818.4E 355.4 2033.2 )1905.3( 5975.2 1011.3S 3008.8E 6937.7 5813.9 1028.0N 2879.7E 356.4 2049.7 )1919.7( 6071.4 1019.2S 3035.0E 7022.0 5871.7 1036.4N 2940.4E 357.4 2067.4 )1935.5( 6167.3 1030.7S 3060.9E 7103.3 5927.4 1044.5N 2999.1E 358.3 2089.9 )1956.2( 6260.1 1058.2S 3085.3E 7160.0 5966.2 1050.5N 3040.0E 358.8 2129.6 )1994.8( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #~ and l~/D from rkb Pool ~15 (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit,North Slope, Alaska CLEARANCE LISTING Page 8 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference wel 1 path Object wellpath : PGMS <0-10215'>,,26,Pad 1R M.D. T.V.D. Hori z Mi n' m E11 i pse Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 6500.0 6600.0 6700.0 6800.0 6900.0 5330.0 5408.1 5495.9 5590.5 5686.7 940.0S 2767.7E 5908.3 4249.5 957.8S 3518.9E 91.4 1316.1 )1259.4( 957.1S 2827.5E 6003.8 4303.7 970.0S 3596.6E 91.0 1345.9 )1288.1( 970.4S 2873.3E 6092.1 4353.9 980.8S 3668.5E 90.8 1391.6 )1332.9( 979.6S 2904.2E 6173.5 4400.1 990.6S 3734.7E 90.8 1451.5 )1392.1( 987.5S 2930.3E 6250.2 4443.8 999.6S 3797.1E 90.8 1515.3 )1455.2( 7000.0 7100.0 7200.0 7300.0 7400.0 5782.8 5879.0 5975.2 6071.4 6167.3 995.5S 2956.5E 6325.9 4486.8 1008.4S 3858.8E 90.8 1579.2 )1518.5( 1003.4S 2982.7E 6407.2 4533.0 1017.6S 3925.1E 90.9 1643.2 )1581.7( 1011.3S 3008.8E 6523.0 4600.3 1028.8S 4018.6E 91.0 1706.0 )1643.2( 1019.2S 3035.0E 6601.6 4646.7 1035.7S 4081.7E 90.9 1767.9 )1704.4( 1030.7S 3060.9E 6678.2 4692.0 1042.3S 4143.2E 90.6 1829.7 )1765.4( 7500.0 7600.0 7700.0 7800.0 6260.1 6347.2 6425.7 6493.5 1058.2S 3085.3E 6754.2 4736.8 1048.7S 4204.2E 89.5 1890.2 )1824.5( 1101.9S 3107.3E 6825.8 4779.0 1054.8S 4261.8E 87.7 1947.8 )1880.3( 1160.5S 3126.4E 6889.7 4816.6 1060.1S 4313.2E 85.2 2001.9 )1931.8( 1232.3S 3141.9E 6956.8 4856.1 1065.6S 4367.1E 82.3 2051.7 )1978.1( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #lA and TVD from rkb Pool ~ (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit,North Slope, Alaska CLEARANCE LISTING Page 9 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference wel 1 path Object wellpath : PGMS <0-11368'>,,29,Pad 1R M.D. T.V.D. Rect Coordinates Horiz Min'm Ellipse M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 6500.0 5330.0 940.0S 2767.7E 6600.0 5408.1 957.1S 2827.5E 6700.0 5495.9 970.4S 2873.3E 6800.0 5590.5 979.6S 2904.2E 5698.3 3909.5 2178.9S 3199.5E 160.8 1933.7 )1848.4( 5802.9 3968.4 2220.1S 3275.4E 160.5 1966.9 )1880.0( 5885.9 4015.6 2252.8S 3335.3E 160.2 2012.2 )1924.7( 6006.8 4085.2 2300.4S 3421.9E 158.6 2068.4 )1980.2( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot ~IA and TVD from rkb Pool #6 (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit,North Slope, Alaska CLEARANCE LISTING Page 11 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference wellpath Object wellpath : PGMS <0-10295'>..25,Pad 1R Horiz Min'm Ellipse M.D. T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 6500.0 5330.0 940.0S 2767.7E 5738.4 4216.1 712.0N 3405.7E 21.1 2092.1 )1976.9( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #lA and TVD from rkb Pool ~6 (80.00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit. North Slope, Alaska CLEARANCE LISTING Page 12 Your ref : lA Version #10 Last revised : 23-0ct-1999 Reference well path Object wellpath : PGMS <0-8570'>,,1,Pad 1R M.D. T.V.D. Horiz Min'm Ellipse Rect Coordi nates M.D. T,V. D. Rect Coordinates Bearing Di st Sep' n 6500.0 5330.0 6600.0 5408.1 6700.0 5495.9 6800.0 5590.5 6900,0 5686.7 940.0S 2767.7E 6502.0 5330.0 940.0S 2767.7E 222.3 0.0 )0.0( 957.1S 2827.5E 6601.5 5402.1 958.9S 2833.7E 106.3 8.8 )0.0( 970.4S 2873.3E 6698.2 5472.3 977,3S 2897.5E 105.8 34.4 )0.0( 979.6S 2904.2E 6789,3 5538.8 994.4S 2957.4E 105.5 75.6 )16.2( 987.5S 2930.3E 6878.3 5603.8 1011.0S 3015.8E 105,4 121.4 )60.8( 7000.0 5782.8 7100.0 5879.0 7200.0 5975.2 7300.0 6071.4 7400.0 6167.3 995.5S 2956.5E 6967.0 5668.6 1027.6S 3074.2E 105.3 167.1 )105.7( 1003.4S 2982.7E 7055.8 5733.3 1044.2S 3132.6E 105,2 213.0 )150.7( 1011.3S 3008.8E 7144.6 5798.1 1060.8S 3191.0E 105.2 258.9 )195.8( 1019.2S 3035.0E 7233.8 5863.2 1077.6S 3249.7E 105.2 304.8 )240.9( 1030.7S 3060.9E 7324,7 5929.7 1094.6S 3309.3E 104.4 349.6 )284.9( 7500.0 6260.1 7600.0 6347.2 7700.0 6425.7 7800.0 6493.5 7900.0 6548.2 1058,2S 3085.3E 7417.7 5998.2 1111.8S 3369.8E 100.7 390.4 )324.1( 1101.9S 3107.3E 7508.7 6065.8 1128.2S 3428.5E 94.7 427.8 )358.4( 1160,5S 3126.4E 7592.5 6128.6 1142.8S 3482.0E 87.1 463.7 )388.8( 1232.3S 3141.9E 7670.1 6187.2 1155.9S 3531.1E 78.9 501.0 )417.4( 1315.0S 3153.4E 7734.6 6236.3 1166.6S 3571.6E 70.5 542,4 )447.1( 8000.O 6588.5 8100.0 6612.9 8200.0 6626.9 8300,0 6640.8 8400.0 6654.0 1406.1S 3160.5E 7786.3 6275.8 1175.0S 3603.9E 62.5 589.7 )481.0( 1502.9S 3163.0E 7824.3 6304.9 1181,2S 3627.5E 55.3 643.6 )521.5( 1601.9S 3162.5E 7853.3 6327.2 1185.9S 3645.5E 49.3 704.5 )570.6( 1701.0S 3162.0E 7879.7 6347.5 1190.1S 3661.8E 44.4 772.5 )629.6( 1800,0S 3161.4E 7907.3 6368.8 1194.6S 3678.8E 40.5 846.0 )695.9( 8500,0 6659.3 8600.0 6660,4 8700.0 6662.6 8800.0 6666.2 8900,0 6670.5 1899.9S 3160.9E 7927.1 6384.0 1197.7S 3690.9E 37.0 921.8 )766.2( 1999.8S 3159.8E 7943.3 6396.6 1200.4S 3700.9E 34.1 1000.8 )840.9( 2099.4S 3150.7E 7956.0 6406.4 1202,4S 3708.7E 31.9 1087.0 )924.3( 2197,4S 3131.3E 7962.5 6411.5 1203.4S 3712.7E 30.3 1179.3 )1015.0( 2293.8S 3105,3E 7965.4 6413.7 1203.9S 3714.4E 29.2 1274.7 )1109.3( 9000.0 6674.9 9100,0 6679.3 9200.0 6683.6 9300.0 6685.0 9400.0 6685.0 2390.2S 3079.2E 7968.2 6415.9 1204.3S 3716.2E 28.2 1370.8 )1204.5( 2486.7S 3053.1E 7971.0 6418.0 1204.8S 3717.9E 27.4 1467.5 )1300.4( 2583.1S 3027.1E 7973.8 6420.2 1205,2S 3719.6E 26.7 1564.5 )1396.7( 2680.3S 3003.6E 7976.0 6421.9 1205.6S 3720.9E 25.9 1660.9 )1492.6( 2777.8S 2981,4E 7978.0 6423.4 1205,9S 3722.1E 25.2 1757.3 )1588.4( 9500.0 6685.0 9600.0 6685,0 9700.0 6685.0 9800.0 6685.0 2875.3S 2959.2E 7979.9 6424.9 1206,2S 3723.3E 24.6 1854.1 )1684.7( 2972.8S 2937.0E 7981.9 6426.5 1206.5S 3724.5E 24.0 1951.1 )1781.4( 3070.3S 2914.8E 7983.9 6428.0 1206.8S 3725.7E 23.5 2048.5 )1878.4( 3167.8S 2892.5E 7985.8 6429.5 1207,1S 3726.9E 23.1 2146.1 )1975.7( All data is in feet unless otherwise stated. Casing dimensions are not included, Coordinates from slot #lA and TVD from rkb Pool ~ (80.00 Ft above mean sea level), Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ M.D. 6500.0 6600.0 6700.0 6800.0 6900.0 7000.0 7100.0 7200.0 7300.0 7400.0 7500.0 7600.0 7700.0 7800.0 7900.0 8000.0 8100.0 8200,0 8300.0 8400.0 8500.0 8600.0 8700.0 8800.0 8900.0 9000.0 9100.0 9200.0 9300.0 9400.0 9500.0 9600.0 9700.0 9800.0 CLEARANCE LISTING Page 13 Your ref : lA Version #10 ARCO Alaska, Inc. Pad 1R, lA Kuparuk River Unit, North S1 ope, A1 aska Last revised : 23-0ct-1999 Reference wellpath Object wellpath : PGMS<O-8568'>Depth Shifted,.1A,Pad 1R T.V.D. .0 ,1 .9 .5 .7 Horiz Min'm Ellipse Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 533O 5408 5495 5590 5686 940.0S 2767.7E 6500,0 5330.0 940.0S 2767.7E 106.1 0.0 )0.0( 957.1S 2827.5E 6599.5 5402.0 958.9S 2833.7E 106.1 8.9 )0.0( 970.4S 2873.3E 6696.2 5472.3 977.2S 2897.5E 105.8 34.5 )0.0( 979.6S 2904.2E 6787.3 5538.8 994.4S 2957.4E 105.5 75.7 )16.2( 987,5S 2930.3E 6876.3 5603.8 1011.0S 3015.9E 105.3 121.4 )60.8( 5782 5879 5975 6071 6167 995.5S 2956.5E 6965.0 5668.6 1027.6S 3074.2E 105.3 167,2 )105.7( 1003.4S 2982.7E 7053.8 5733.3 1044.2S 3132.6E 105.2 213.0 )150.7( 1011.3S 3008.8E 7142.6 5798.1 1060.8S 3191.0E 105.2 258.9 )195.9( 1019.2S 3035.0E 7231.7 5863.1 1077.6S 3249.7E 105.2 304.8 )240.9( 1030.7S 3060.9E 7322.7 5929.7 1094.6S 3309.3E 104.4 349.6 )284.9( 6260.1 6347.2 6425.7 6493.5 6548.2 1058.2S 3085.3E 7415.7 5998.2 1111.8S 3369.8E 100.7 390.5 )324.1( 1101.9S 3107.3E 7506.7 6065.8 1128.2S 3428.5E 94.7 427.8 )358.4( 1160.5S 3126.4E 7590.5 6128.6 1142.8S 3482.0E 87.1 463.7 )388.9( 1232.3S 3141,9E 7668.1 6187.2 1155.9S 3531.1E 78.9 501.0 )417.4( 1315.0S 3153.4E 7732.6 6236.3 1166.6S 3571.6E 70,5 542.4 )447.1( 6588.5 6612.9 6626,9 6640,8 6654.0 1406.1S 3160.5E 7784.3 6275.8 1175.0S 3603,9E 62,5 589.8 )481.0( 1502.9S 3163.0E 7822.3 6304.9 1181.2S 3627.5E 55.3 643.6 )521.5( 1601.9S 3162.5E 7851.3 6327.2 1185.9S 3645.5E 49.3 704.5 )570.7( 1701.0S 3162.0E 7877.7 6347.5 1190.1S 3661.8E 44.4 772.6 )629.6( 1800,0S 3161,4E 7905.3 6368.8 1194.6S 3678.8E 40.5 846,0 )696.0( 6659 6660 6662 6666 6670 1899.9S 3160.9E 7925.0 6384.0 1197.7S 3690.9E 37.0 921.8 )766.2( 1999.8S 3159,8E 7941.3 6396.6 1200.3S 3700.9E 34.1 1000.8 )840.9( 2099.4S 3150.7E 7954.0 6406.4 1202.4S 3708.7E 31.9 1087.0 )924.3( 2197.4S 3131,3E 7960.5 6411.4 1203.4S 3712.7E 30.3 1179.3 )1015.0( 2293.8S 3105.3E 7963.4 6413.7 1203.9S 3714.4E 29.2 1274.7 )1109.3( 6674 6679 6683 6685 6685 2390.2S 3079.2E 7966.2 6415.8 1204.3S 3716.1E 28.2 1370.9 )1204.5( 2486.7S 3053,1E 7969.0 6418.0 1204.8S 3717.9E 27.4 1467.5 )1300.4( 2583.1S 3027.1E 7971.7 6420.1 1205.2S 3719.6E 26.7 1564.5 )1396.8( 2680.3S 3003,6E 7974.0 6421.9 1205.6S 3720.9E 25.9 1660.9 )1492.6( 2777.8S 2981.4E 7975.9 6423,4 1205.9S 3722.1E 25.2 1757.3 )1588.4( 6685 6685 6685 6685 2875.3S 2959.2E 7977,9 6424.9 1206.2S 3723.3E 24.6 1854.1 )1684.7( 2972.8S 2937.0E 7979.8 6426.4 1206.5S 3724.5E 24.0 1951.2 )1781.4( 3070.3S 2914.8E 7981.8 6427.9 1206.8S 3725.7E 23.5 2048.5 )1878.4( 3167,8S 2892.5E 7983.7 6429.4 1207.1S 3726,9E 23.1 2146.1 )1975.7( All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #lA and TVD from rkb Pool ~ (80,00 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 1R lA slot #lA Kuparuk River Unit North Slope, A1 aska SUMMARY CLEARANCE by Baker Hughes INTEQ REPORT Your ref : lA Version #10 Our ref : prop3679 License : Date printed : 23-0ct-1999 Date created : 22-0ct-1999 Last revised : 23-0ct-1999 Field is centred on n70 16 18.576,w150 5 56.536 Structure is centred on n70 23 12.884,w149 40 37.889 Slot location is n70 23 11.369,w149 40 33.820 Slot Grid coordinates are N 5991049.979, E 539829.377 Slot local coordinates are 154.00 S 139.00 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Object wellpath PGMS <0-11653'>,,9,Pad 1H PGMS <0-7440'>,,22,Pad 1H PGMS <0-10228'>,,14,Pad 1H PGMS <O-7561'>,,lO,Pad 1H PGMS <0-8315'>,,21,Pad 1H PGMS <O-8090'>,,2,Pad 1H PGMS <0-8670'>,,18,Pad 1H PGMS <0-8990'>,,19,Pad 1H MSS <0-10840'>,,5,Pad 1H PGMS <O-7510'>,,16,Pad 1H PGMS <O-8455'>,,17,Pad 1H PGMS <O-10300'>,,20,Pad 1H PGMS <O-7880'>,,1,Pad 1H PGMS <0-11172'>,,13,Pad 1H PGMS <0-9774'>,,11,Pad 1H PGMS <0-10172'> ,12,Pad 1H PGMS <0-10332'> ,15,Pad 1H GMS <0-8155'>, 3,Pad 1H GMS <0-8740'>, 8,Pad 1H PGMS <0-8086'> ,4,Pad 1H GMS <0-6750'>, 6,Pad 1H GMS <0-8300'>, 7,Pad 1H PMSS <0 - 5511'>,,Ugnu-O1,Pad 1H PMSS <0-6755'>,,17,Pad 1G MMS <6350 - 7760'>,,lOA,Pad 1G PMSS <6390 - 7906'>,,10A,Pad 1G PGMS <O-7970'>,,lO,Pad 1G Closest approach with 3- D Minimum Distance method Last revised Distance M.D. 24-0ct-1998 11206.9 12021.8 23-Jun-1993 10188.1 12021.8 24-Jun-1993 8695.7 10911.1 17-May-1993 10151.0 12021.8 24-Jun-1993 10726.9 12021.8 17-May-1993 10005.3 12021.8 17-May-1993 10944.2 12021.8 18-Feb-1993 4601.8 11354.8 21-Aug-1991 10485.5 12021.8 17-May-1993 8062.5 11988.0 22-Feb-1993 7057.7 11028.0 18-Feb-1993 6675.0 8877.0 5-May-1993 10917.5 12021.8 24-2un-1993 11144.5 12021.8 17-May-1993 11085.0 12021.8 17-May-1993 10748.5 12021.8 17-May-1993 10768.0 12021.8 21-Aug-1991 5747.1 12021.8 21-Aug-1991 10219.9 12021.8 8-~an-1993 7511.3 12021.8 21-Aug-1991 9792.4 12021.8 11-~un-1998 9536.9 11733.0 25-Jun-1998 9263.8 12021.8 lO-Aug-1999 6295.7 12021.8 2-Feb-1999 4246.7 12021.8 8-Sep-1996 4245.4 12021.8 2-Feb-1999 4155.9 12021.8 Diverging from M.D. 12021 12021 11091 12021 12021 12021 12021 11354 12021 11988 11028 8877 12021 12021 12021 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 11955.0 12021.8 12021.8 12021.8 12021.8 12021.8 PGMS <0-9225'>,,16,~ GMS <0-7415'>,,4,Pad 1G GMS <O-8489'>,,3,Pad 1G GMS <0-10086'>,,5,Pad 1G PMSS <2156-2674'>,,6,Pad 1G GMS <0-9250'>,,6A,Pad 1G PGMS <O-8851'>,,7,Pad 1G PGMS <O-8715'>,,8A,Pad 1G PMSS <2232-3720'>,,8,Pad 1G PGMS <0-8360'> ,9,Pad 1G PGMS <0-8208'>, 11,Pad 1G PGMS <0-9116'>, 12,Pad 1G PGMS <0-8110'>, 13,Pad 1G PGMS <0-7950'>, 14,Pad 1G PGMS <0-7533'>, 15,Pad 1G MSS <1651-2529'>,,2,Pad 1G GMS <0-9754'>,,2A,Pad 1G GMS <0-7970'>,,1,Pad 1G PGMS <0 - 10180'>,,21,Pad 1R PGMS <0-7530'> ,3,Pad 1R PGMS <0-9310'> PGMS <0-8440'> PGMS <0-8775'>. PGMS <0-9303'>. PGMS <0-7182'>. PGMS <0-8570'>. PGMS <0-8225'> PGMS <0-8800'> PGMS <0-7295'>. PGMS <0-8570'> PGMS <0-9250'> PGMS <0-7420'> PGMS <0-8450'> PMSS <0-5350'> PGMS <0-10215'> ,2,Pad 1R ,4,Pad 1R ,5,Pad 1R ,6,Pad 1R ,7,Pad 1R ,8,Pad 1R ,9,Pad 1R lO,Pad 1R 11,Pad 1R 13,Pad 1R 14,Pad 1R 15,Pad 1R 16,Pad 1R 18,Pad 1R ,26,Pad 1R PMSS <6970 - 12972'>,,24,Pad 1R PGMS <0-12180'> ,23,Pad 1R PGMS <0-10080'> ,20,Pad 1R PGMS <0-9838'>, 19,Pad 1R PGMS <0-11368'> ,29,Pad 1R PGMS <0-12388'> ,27,Pad 1R PGMS <0-10345'> ,17,Pad 1R PGMS <0-10295'> ,25,Pad 1R PGMS <0-8320'>,,12,Pad 1R PGMS <0-3991'>,,U SWPT1,Pad 1R PMSS <473-11428'>,,32,Pad 1R PMSS <0-15530'>,,33,Pad 1R PMSS <741-13570'>,,34,Pad 1R PMSS <645-12647'>,,31,Pad 1R MSS <0-9775'>,,E UGNU #1,Pad 1R PGMS <0-8570'>,,1,Pad 1R PGMS <0-10810'>,,22,Pad 1R PGMS<O-8568'>Depth Shifted,,1A,Pad 1R 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 11-Dec-1992 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 2-Feb-1999 lO-Apr-1991 2-Feb-1999 2-Feb-1999 22-0ct-1999 5888.5 4126.9 6146.7 6747.2 6494.1 6546.1 2081.6 40O7.0 5029.8 1649.5 6311.3 7039.7 7559 1 6041 8 5279 7 7090 9 7055 2 5776 1 4716 1 1845 6 1108 8 1380 2 3767 7 4611 4 3813 0 4069 4 4375 2 5135 8 3457 1 3530 7 3598 3 2870.9 1933.0 5181.3 1315.7 2509.1 3966.5 4527.3 4837.7 1933.1 1910.7 5405.8 2091.4 4165.6 10167.2 5162.9 5070.4 4780.9 5220.9 6028.7 0.0 3470.8 0.0 12021. 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021 8 12021 8 12021 8 12021 8 6498 0 8050 0 9357 0 11187 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498 0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6498.0 6500.0 6498.0 6498.0 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 12021.8 6498.0 8050.0 9357.0 11187.0 12021.8 12021.8 8970.0 9786.O 6498.0 6498.0 7520.0 6498.0 6498.0 6498.0 6498 0 6498 0 6498 0 11958 0 8883 0 11262 0 9909 0 9003 0 6498 0 11980 0 6498 0 6498 0 6498 0 9366 0 9100 0 6498 0 11031 0 6498 0 650O.0 12015.0 6498.0 1 -01A Proposed Comple( ,on Liner top and Whipstock Depth's are based on Original RKB to the hanger from the 7" Csg Detail. These depths need to be converted to Pool 6 RKB. Window in 7" 7" Baker Bridge Plug set @ +/-6520' MD. Abandoned C-Sand Perfs 8004'- 8103' Abandoned A-Sand Peds 8199'- 8245' 8289'-8300' 7",26#,J-55 casing @ 8535' MD face Fill H. 3-1/2" 5M FMC Gen I I I tubing hanger with 3-1/2" L-80 EUE 8rd Mod pin down. G. 3-1/2" 9.3# L-80 EUE 8rd Mod Tubing to surface. F. 3-1/2" Camco 'DS' landing nipple with 2.875" ID No-Go profile set at +/-500' MD. E. 3-1/2" 9.3# L-80 EUE 8rd Mod tubing to 'DS' landing nipple w/ 3-1/2" x 1" Camco 'KBMM' mandrels w/DV's, spaced out as follows: GLM# ME) TVD 2 TBD TBD 3 TBD TBD 4 TBD TBD 5 TBD TBD 6 TBD TBD Note: Each GLM should have 6' L-80 handling pups installed on top and bottom. D. 3-1/2" x 1-1/2" Camco 'MMM' Mandrel w/DCR Dump Kill Valve (3000 psi casing to tubing shear). 6" L-80 handling pups installed on top and bottom of mandrel. C. 1 joint 3-1/2" 9.3# L-80 EUE 8rd Mod Tubing B. 3-1/2" Camco 'DS' landing nipple with 2.812" ID and No-Go profile A. Baker 3-1/2" 'GBH-22' Tubing Seal Assembly w/10' of seals and special Iocator to locate in liner tie back sleeve. Locator 5.125" OD, seals 4.0" OD. 6' L-80 Handling Pup Joint installed. Liner Top Baker 5" x 7" 'C-2 ZXP' Liner Top Isolation Packer and 6' setting sleeve w/5" BTC Box Down. Baker 5" x 7" 'HMC' Hydraulic Liner Hanger w/5" BTC Pin x Pin. Baker '80-40' PBR (12' Length w/4" ID seal bore). 3-1/2" EUE 8rd Mod pin down. Solid Liner 3-1/2" 9,3# L-80 EUE 8rd Mod from Liner Hanger to Landing Collar. 3-1/2" EUE 8rd Landing Collar. 1 joint 3-1/2" L-80 EUE 8rd Mod tubing. 3-1/2" EUE 8rd Float Collar. 2 joints 3-1/2" L-80 EUE 8rd Mod tubing. 3-1/2" EUE 8rd Float Shoe. ..... Future A3 - A4 Sand Perfs Fault BDN 10/21/99 WELL PERMIT CHECKLIST ,. WELL NAME,~'/'~/' .... :'O (4PROGRAM:, exp ~ dev ,/ redrll ~ se~__ wellbore seg ann. disposal para req_ INIT CLASS /.-(~/~, GEOL AREA ~~ UNIT~ ~//~; ON/OFF SHORE ~ ADMINISTRATION .R DATE COMPANY ENGINEERING ~,A~~,. 0 DATE 1. Permit fee attached. 2. Lease number approPriate.' .-A~.' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '- -- '"~' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' 3. Unique well name and numbe~ ............... 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 0. Operator has appropriate bond in force ............. '1. Permit can be issued without conservation order ........ 2. Permit can be issued without administrative approval ...... 3. Can permit be approved before '15-day wait ........... GEOLOGY 14. Conductor string provided ................... 15. Surface casing protects all known USDVVs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 2'1. If a re-drill, has a '10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ' ~'~_~ {) C) psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones ....... 32. Seismic analysis of shallow gas zones ............. y N,~,¢ A.~R DATE 33. Seabed condition survey (if off-shore) ............. ~ "' J/'~"~ 34. Contact name/phone for weekly progress reports [exploratory only]~__~~N ANNULAR DISPOSAL 35. APPR DATE With proper cementing records, this plan (A) will contain waste in a su~ ....... Y N (B) will not contam~, or cause drillin~te... Y N to surface; / -~_ (C) will notim · Y N (D) will no~.d§mage producing formation or impair recovery from a poo ,l(and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N Comnmnts/Instructions: c:\msoffice\wordian\diana\checklist (rev. 09~27~99) TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Decc~nbcr 8, 1998 Drew Hembling Drilling Team Leader ARCO Alaska. Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Unit 1R-01A ARCO Alaska. Inc. Permit No: 98-237 Sur Loc: 154'FNL. 139'FWL, Sec. 20, T12N, R10E. UM Btmhole Loc. 2038'FNL, 165'FEL, Sec. 20, T12N, RIOE. UM Dear Mr. Hembling: Enclosed is thc approved application for permit to rcdrill thc above referenced well. Thc permit to rcdrill does not exempt you from obtaining additional permits required bx' lax,,' from other governmental agencies? and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must bc given to allow a representative of thc Commission to witness a test of BOPE installed prior to drilling new hole. Notice may bc given by contacting thc Commission petroleum field inspector on thc North Slope pager at 659-3607. ) Commissioner ~ BY ORDER OF THE COMMISSION dlffEnclosures CC; Department of Fish & Game. Habitat Section w/o cncl. Department of Environmental Conservation w/o cncl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill ~ Reddll X I lb Type of Well Exploratory F' Stratigraphic Test E~ Development Oil X I Re-Entry [~ Deepen [] Service [] Development Gas r, Single Zone X Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 82' feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 ADL 25635, ALK 2568 4. Location of well at surface 7.' Unit or property Name 11. Type Bond (see 20 AAC 25.025) 154' FNL, 139' FWL, Sec.20, T12N, R10E, UM Kuparuk River Unit Statewide At top of productive interval (@ TARGET ) 8. Well number Number 1365' FNL, 1400' FEL, Sec. 20, T12N, R10E, UM 1R-01A #U-630610 At total depth 9. Approximate spud date Amount 2038' FNL, 165' FEL, Sec. 20, T12N, R10E, UM December 1998 L~~'~/''/O $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 9781' MD 165' @ TD feet No close approach feet 2560 6672' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 8122' feet Maximum hole angle 90° Maximum surface 2300 psig At total deplh (TVD) 2900 psig @ 6282' 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 2.75" 2.375" 4.6# L-80 FL4S 1881' 7900' 6365' 9781' 6672' N/A Slotted Liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural ' Conductor Surface Intermediate Production . .~ . Perforatio~idneelth: measured0RIGINAL ' true vertical .,~.::....].. : -.:! ,:. i . :: - ~ ,',:',! 20. Attachments Filing fee X Property plat [~ BOP Sketch X Diverter Sketch I-- Drilling program X Drilling fluid program F,' Timevs depth plot Bi Refraction analysis F~ Seabed report E~ 20 AAC 25.050 requirements 21. I hereby certify that the foregoing is true and correct to the best of my knowledge S,gned r ~.~..yr.,~__~/..¢..,~ ?.~ ,/ Title Drilling Team Leader Date/i//,2/ 92 ~_.,~] Commisfion Use Only ~g~r;qu~rire? ~ I uAPl number Approval date See cover letter for Permi er~_.. ~ ~' 50- 4D,.~., 9 /-"/~)~' c:::~/ -- -' other requirements Conditions of approval Samples required [] Yes ~,' No Mud I Yes 4;~ No Hydrogen sulfide measures "~ Yes [~ No Directional survey required ~, Yes E., No Required working pressure for DOPE 2M r~ 3M F! (~M)[-~! 10M Fr~ 15M Other:L//I~,. l£1"i'";~a.' ': ..... ·" .; David W. J0h;i:::i,]i:byorderof Approved by Commissioner the commission Date I C~ O ' l ~k Form 10-401 Rev. 7-24-89 Submit in tri icate Kuparuk 1R-O1A CT Sidetrack and Completion Intended Procedure Objective: Plugback existing wellbore with 17 ppg cement. Mill window in straddle interval thru 3-1/2" tubing and 7" casing. Directionally drill a horizontal well from the existing wellbore. Complete with 2-3/8" slotted liner. Intended Procedure: · Cement squeeze the existing perforations and strad ,cl41e interval with 17 ppg cement. Leave top of cement above GLM at 79~,1~( WOC. · Underream cement down to 2-7/8" x 3-1/2" XO at 8136'. · Install mechanical whipstock. Mill window at 8122' through 3-1/2" and 7"casing. Drill 10' of formation and perform leak off test to 0.5 ppg above the highest anticipated mud weight. Plans are for drilling this sidetrack overbalanced with a kill weight mud. · Directionally drill 2-3/4" x 1658' horizontal well to access Kuparuk A reserves. · Run 2-3/8" slotted liner to TD. · Place on production. Drilling fluids will be injected into disposal well 1 R-18. November 10, 1998 Kuparuk 1R-01A Potential Drilling Hazards POST ON RIG No H2S gas is anticipated from this well. BHP: 2900 psi ~ 6282' TVD, 6200'ss (8.9 ppg EMW) estimated pressure. Reservoir frac gradient is -0.8 psi/ft or 15.4 EMW. Plans are to drill with 9.5 ppg mud which provides sufficient over- balanced pressure. Perform a leak-off test to 10 ppg. Maximum anticipated WHP w/full column of gas' -2300 psi assuming O. 1 psi/ft gas gradient. · No gas saturated intervals are expected. ARCO Alaska, Inc. Kuparuk 1R-01 ilR-01 PBTD: i 8.570 flKB APl: SSSV Type: Annular Fluid: Last Tag: Rev Reason: i Elevations 500292140400 ! Well Type: i PROD Camco 'TRDP-1A-SSA' i Oriq Completion: ! 8/27/85 Last W/O: 10/29/90 8455 I Last Tag Date:! 12/12/94 New Schem i Last Update:; 2/10/98 TD: 18,570 ftKB Max Hole Angle:;48 deg @ 4600 Angle (~ TS:139 deg~ 8007 Angle @ TD: i 37 deg @~ 8570 i Grd ! 45 ft i Original Rig RKB ! 33 ft !Casing String - CONDUCTOR Btm i Jnts i Wt i Grd 62.501 Thd 16.000 in CONDUCTOR 1151 ; H-40 !Casing String - SURFACE !Item Btm I Jnts ! Wt i Grd Thd 19 625 in SUR. CASING 4,3801 ; 36.00i J-55 iCasinq String - PRODUCTION l ltem 7.000 in PROD. CASING Tubing String - TUBING Btm i Jnts 8,5351 Wt I Grd 26.00! J-55 Thd Item Top i Len 331 J nts Wt I Grd Thd 3.500 in TUBING 7,945 9.30i J-55 EUE 8RD AB MOD 3.500 in TUBING 7,978; 158 9.30{ L-80 EUE 8RDAB MOD 2.875 in TUBING 8,136; 13 6.50i J-55 EUE8RDABMOD Perforations Interval ',Zone :Status 8,072 - 8,103 i C-1,UNIT B 8,199 - 8,245 !A-3 8,289 - 8,300 iA-2 11 i 4110/26/85 8,004- 8,103 8,200- 8,22O !UNIT I D,C-4,C-3,C-2,C-1 B A-3 Feeti SPF! Date '~ Type iComment 311 12'. 10/26/85 !5" HJ II Csg Gun 1120 deg. phasing; ! i REPERF 10/28/90 46~ 4:, 10/26/85 i4" HJ II Csg Gun 190 deg. phasing !4" HJ II Csg Gun 90 deq. phasing '.5" Csg Gun REPERF; 60 deg. phasing 991 12i 10/28/90 20i 6 i 12/5/94 i2 1/8" EnerJet REPERF; Zero deg. phasing Gas Lift Mandrels/Valves Stn' MD TVD Man Mfr ',Man Type 1 [ 2,279! 2 272iCamco l 2 i 4,2951 3 808! Camco 3 i 5,543 4 658!Camco 4 i 6,2341 5,139!Camco !3 1/2 X 1 KBUG 5 ", 6,6721 5 455i Camco i3 1/2 X 1 KBUG I 6 '. 7,113"; 57771Camco 7 i 7.4871 6 052!Camco 8 ': 7 902i 6 367 Camco I Production Mandrels/Valves Stn MDi TVD~, Man Mfr 9 i 7,984! 6,4301 Camco ! , i MMG-W Other {plugs,~quip., etc.) - JEWELRY Mfr !Type :Latch GLV !BK Port ! TROi Run !3 1/2 X I KBUG 0.188 1374.0', 12/17/94; i3 1/2 X I KBUG DV iBK 0.000 ': 0.0~; 12/7/94! ;3 1/2 X I KBUG GLV i BK 0.000 I 1337.0~ 12/17/94', 31/2X1KBUG 3 1/2 X 1 KBUG 3 1/2 X 1 1/2 MMG-2 DV DV GLV !BK DV i BK ov IRK Type !latch DV !RKP Man Type i Mfr 3 1/2 X 1 1/2 0.000 j 0.0 10/29/90! 0.000 ! 0.0: 12/7/94 0.000 i 1305.0! 12/17/94 0.000 ' 0.0! 10/29/90 0.250 'i 0.01 12/16/94 Port 0.000 I TRO;, Run ! 0.0i 10/29/90 Depth! Type ! Description J ID 1,7971 SSSV ! Camco 'TRDP-1A-SSA' !2.812 7,947 i OEJ ! Camco 'OEJ' ;2.812 7,9691PKR 8,126 PKR 8,128 BPL PORTED NIPPLE 8,141 NO GO 8,149 i SHEAR OUT 8,149 !TUBING TAIL Other (plugs, equip., etc.) - SLEEVE ! Camco 'HRP-1-SP'- 12.867 i Baker 'DB' - ~{~I~D¢ 12.875 jAVA ~>J 'L~2' i 2.750 ~ Camco 'D' Nipple f 2.250 ! Camco t 2.441 _.1 ...[ ti iTubing '~7~,X~"/'~ ~.(~f~ ~)i-~(.¢' !2.441 Depth! Type 8,128 BPI SLEEVE Fish. FISH i Description I ID lAVA; Set on 10/15/94 i2.310 SSSV -- TUBING -- PROD. CASING -- Depthi Description Comment 8,212i 1" GLV ~ Empty Pocket; Fell to Rathole Gas Lift Mandrel/Valve -- 1 SUR. CASING -- Gas Lift Mandrel/Dummy Valve 2 Gas Lift MandrelNalve 3 Gas Lift -- Mandrel/Dummy Valve 4 Gas Lift Mandrel/Dummy Valve 5 Gas Lift MandrelNalve -- 6 Gas Lift -- Mandrel/Dummy Valve 7 Gas Lift MandrelNalve -- 8 OEJ -- PKR -- TUBING Production Mandrel/Dummy Valve 9 Perf Perf PKR ---- TUBING NOGO -- SHEAR OUT -- TUBING TAIL -- Peri Peri GLV Perf KRU 1 R-01A Proposed CT Sidetrack Horizontal 3-1/2" Ti Upper Packer 7969' 3-1/2" Camco TRDP SSSV Production Mandrel 7984' AVA Ported Nipple 8128' 3-1/2" x 2-7/8" XO 8136' Lower Packer 8140' Tbg Tail 8149' /~op of 2-3~8" Liner in 3-1/2" Tubing @ ~7900' 2-3~8" Slotted liner ~7900' to TD cut thru 3-1/2" and 7" at 8122' 2-3~4" Open hole TD @ 9781' 7" Casing shoe @ 8535' Current perforations to be cement squeezed C T Drilling Wellhead Detail Methanol Injection Otis 7" WLA Quick Connect Alignment Guide Flange 7-1/16", 5M Ram Type Dual Gate BOPE Flanged Fire Resistant Kelly Hose to Dual HCR Choke Manifold ~ CT Injector Head ? I % Stuffing Box (Pack-Off), 10,000 psi Working Pressure I -- 7" Riser I -I ~. Annular BOP (Hydril),7-1/16" ID 5000 psi WP (3.5") / (~ ' Cutters or ~ Combination Cutter/Blinds Slip/Pipe Rams Man Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Manual over Hydraulic Ram Type Dual Gate BOPE 7-1/16" ID with Pipe/Slip Rams Manual Master Valve 0.458' (5.5") 2" Pump-In Hanger Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold 7" Annulus 9-5/8" Annulus Structure : Pad 1R Slot : 1R-O1 Field : Kuparuk River Unit Location : North Slope, Alaska East (feet) -> Crcat¢.d by plm~ner Date pmotte¢ : 9-Nov~g8 Plot Reference is IR-O1A Ver~;ion J6. Coordinates o,e in leer reference IR-0h 1rue Vertical Depths a~e reference rkb - MSL = 82 ft, --- Bakor Hughos INTEQ --- 3500 3600 37[)0 3800 ,3900 4000 41 O0 4200 4500 4400 4500 4600 -1700 4800 4900 $000 51 O0 L .... J_~._J__.__.L__..i L_.__J..~, I I _ .._...L__ I .J~£.__..L~.~__ J__.__ __L__.___L_,__/_ _., ._ _L_ .._ L _ __.J~__J_ ..__,L____ ._[_ .___L _.. J._. _._J.___.__J J~ __ J____ J._...,. J.__./ ~NTE{~2 6100 6200 6300 640u 6500 I---6600 I 6700 \, -~}....._ Tie on - 6360,50 Tvd, t209.39 S, 3755.61 E ----...._ ........... KOP -- 8122 MD, 6455.29 TVDss Tie ¢,n - ,39.1 $Inc, 8000.00 bl,J. 6560.50 Tvd. 3861.1'2 Vs · \ k,.\ KOP - 8122 MD. 6455.29 TVDss 'X ,, \ iR-Olbhs ® I R- 0 '1 bhs '"\ T.D. & End of Turn - 6590.00 hz,J, 1880.00 5, 4980.00 E / 1R-.O i ihs 1R-O I ehs · 'I.D. ~z. End of Turn - 90.00 Inc. 9780.74 M,J, 6590 30 Tvd. $274.70 ~/s 3700 3800 3900 4000 4100 4200 4300 ,4400 ~500 4601} 4700 4.~00 -~900 5000 5100 5200 5}00 5400 5500 5600 ~,~00 5800 Vertical Section (feet) -> Azimuth 118.41 wi}h reference 0.00 N, 0.00 E from ~R-01 900 I000 I100 1200 1300 0 1400 ~ --I- ~500 ? 1600 I 1700 1800 1900 2000 2100 Co~npauy: Well: Calculation Method: Vertical Sect. Plane: Vertical Sect. Plane: Measured Depth from: True Vertical Depth: ARCO Alaska, hie. 1R-01A Version//6 Minimum Curvature 118.410 TRUE 118.110 GRID RKB Sea level Proposal Calculations Coordinates provided in: TRUE and GRID relative to Wellhead and ALASKA STATE PLAN Rig: Field: Mag. Declination: (;rid Correction: 0.300 Total Correctiou: 27.000 Dip Auglc: 80.66 RKB Height: 82.00 Nabors 3s/CTU #4 Prudhoc Bay, Alaska 27.300 Coords. - TRUE N(+)/S(-) E(+)/W(-) Lat. (Y) -1209.39 3735.61 -1213.36 3750.88 -1217.33 3766.12 -1221.28 3781.35 -1225.24 3796.57 -1228.71 3809.94 -1229.18 3811.77 -1232.54 3827.95 -1234.93 3845.63 -1236.34 3864.68 -1236.76 3884.95 -1236.17 -1234.60 -1232.04 -1228.52 -1224.06 -1218.7t -1213.83 4042.33 -1212.52 4047.28 Coords. - ASP N(+)/S(-) E(+)/W(-) l.at. (Y) 5989860.54 543570.99 Coords. - GRID E(+)/W(-) 3741.61 5989856.65 543586.28 3756.90 5989852.76 543601.54 3772.16 5989848.89 54.3616.80 3787.42 5989845.01 543632.03 3802.65 5989841.61 543645.42 3816.04 5989841.t5 543647.26 3817.88 5989837.87 543663.45 3834.07 5989835.57 543681.14 3851.76 5980834.26 543700.20 -1215.72 3870.82 5989833.96 54372{'}.47 -1216.02 3891.09 5989834.65 543741.81 -1215.33 3912.43 5989836.34 543764.05 -1213.64 3934.67 5989839.02 543787.(.12 -1210.96 3957.64 5989842.66 543810.54 -1207.32 3981.16 5989847.25 -1202.73 4005.07 5989852.73 543858.55: -1197.25 4029.17 5989857.70 -1192.28 4048.34 5989859.(N 543882.67 -1190.94 4053.29 -1206.50 4071.52 5989865.19 -1201.12 4095.91 5989870.70 4120.44 4145.08 4169.82 4194.65 4219.54 4244.48 -1181.48 4269.46 -1181.28 4294.45 -1181.73 4319.44 5989875.57 5989879.80 5989883.38 5989886.32 5989888.61 598989O.25 5989891.24 543906.88 184.79 4077.50 543931.24 179.28 4101.86 543955.74 174.41 4126.36 543980.36 170.18 4150.98 544005.09 166.60 4175.71 544029.90 - 163.66 4200.52 544054.78 161.37 4225.40 544079.72 - 159.73 4250.34 544104.68 - 158.74 4275.30 5989891.58 544129.67 -1158.40 4300.29 5989891.26 544154.66 -1158.72 4325.28 -1182.83 4344.40 5989890.29 544179.64 -1159.69 4350.26 -1184.58 4369.34 5989888.67 544204.58 -1161.31 4375.20 -1186.99 4394.22 5989886.39 544229.47 -1163.59 4400.09 -1190.04 4419.02 5989883.47 544254.29 -1166.51 4424.91 -1193.74 4443.75 -1198.08 4468.36 -1203.06 4492.86 -1208.69 4517.22 5989879.90 544279.{')3 -1170.08 4449.65 5989875.69 544303.671 -1174.29 I 4474.29 5989870.83 544328.19 -1179.15 4498.81 5989865.34 544352.58 -1184.64 4523.20 Job No: AFE No: API Nu: BHI Rep: Joh Start Date: Joh Eud Date: Comments Tie in Position Kick off Point Meas. Incl. TRUE GRID Subsea Coords. - TRUE Coords. - ASP Coords. - GRID Dogleg Tool Face Vertical Build Turn Depth Angle Azi. Azi. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Section Comments (de~) (de~) (d~) (fl) Lat. (Y) Dep. (X) Lat. (Y ~ Dep. (X) Lat. (Y) Dep. (X) (°/1001't) (0,0) (°/I 00ft) (°/100ft') 8900.00 89.65 105.24 104.94 6589.76 -1214.94 4541.42 5989859.21 544376.82 -1190.77 4547.44 6.00 85.00 4572.52 0.44 6.00 8925.00 89.77 106.74 106.44 6589.89 -1221.83 4565.45 5989852.45 54440{).89 -1197.53 4571.51 6.00 85.00 4596.94 0.48 6.00 8950.00 89.88 108.23 107.93 6589.97 -1229.34 4589.30 5989845.{)6 544424.77 -1204.92 4595.39 6.00 85.00 4621.48 0.44 5.96 8975.00 90.00 109.73 109.43 6589.99 - 1237.47 4612.94 5989837.05 54444.8.~5 - 1212.93 4619.07 6.00 85.00 4646.15 0.48 6.00 8975.07 90.00 109.73 109.43 6589.99 -1237.49 4613.00 5989837.03 54444.8.52 -1212.95 4619.14 6.00 89.00 4646.21 0.00 0.00 3 9000.00 90.00 112.22 111.92 6589.99 -1246.42 4636.28 5989828.23 54.4471.84 -1221.75 4642.46 10.00 89.00 4670.93 0.00 9.99 9025.00 90.00 114.72 114.42 6589.99 -1256.37 4659.21 5989818.39 544.494.82 -1231.59 4665.44 10.00 89.00 4695.84 0.00 10.00 9050.00 90.00 117.22 116.92 6589.99 -1267.32 4681.68 5989807.57 544517.35 -1242.41 4687.97 10.00 89.00 4720.81 0.00 10.00 9075.00 90.00 119.72 119.42 6589.99 -1279.24 4703.66 5989795.76 5~4539.39 -1254.22 4710.01 10.00 89.00 4745.81 0.00 10.00 9077.76 90.00 120.00 119.70 6589.99 -1280.61 4706.05 5989794.40 544541.79 -1255.58 4712.41 10.00 89.00 4748.57 0.00 10.14 9100.00 90.00 122.24 121.94 6589.99 -1292.10 4725.09 5989783.01 544560.89 -1266.97 4731.51 10.08 89.00 4770.78 0.00 10.07 9125.00 90.00 124.76 124.46 6589.99 -1305.90 4745.93 5989769.32 544581.80 -1280.66 4752.42 10.08 89.00 4795.68 0.00 10.08 9150.00 90.00 127.28 126.98 6589.99 -1320.60 4766.15 5989754.73 544602.10 -1295.25 4772.72 10.08 89.00 4820.46 0.00 10.08 9175.00 90.00 129.80 129.50 6589.99 -1336.18 4785.70 5989739.25 544621.73 -1310.73 4792.35 10.08 89.00 4845.07 0.00 10.08 9200.00 90.00 132.32 132.02 6589.99 -1352.60 4804.55 5989722.93 54464{).67 -1327.05 4811.29 10.08 89.00 4869.46 0.00 10.08 9225.00 90.00 134.84 134.54 6589.99 -1369.83 4822.66 5989705.80 544658.87 -1344.18 4829.49 10.08 89.00 4893.59 0.00 10.08 9250.00 90.00 137.37 137.07 6589.99 -1387.84 4839.99 5989687.87 544676.29 -1362.11 4846.91 10.08 89.00 4917.40 0.00 10.12 9275.00 90.00 139.89 139.59 6589.99 -1406.60 4856.52 5989669.20 544692.91 -1380.78 4863.53 10.08 89.00 4940.86 0.00 10.08 9300.00 90.00 142.41 142.11 6589.99 -1426.07 4872.20 5989649.81 544708.70 -1400.17 4879.32 10.08 89.00 4963.92 0.00 10.08 9325.00 90.00 144.93 144.63 6589.99 -1446.21 4887.01 5989629.75 544723.61 -1420.23 4894.23 10.08 89.00 4986.52 0.00 10.08 9350.00 90.00 147.45 147.15 6589.99 -1466.98 4900.92 5989609.05 544737.63 -1440.93 4908.25 10.08 89.00 5008.64 0.00 10.08 9375.00 90.00 149.97 149.67 6589.99 -1488.34 4913.90 5989587.76 544750.72 -1462.22 4921.34 10.08 89.00 5030.23 0.00 10.08 9400.00 90.00 152.49 152.19 6589.99 -1510.25 4925.93 5989565.91 544762.87 -1484.07 4933.49 10.08 89.00 5051.23 0.00 10.08 9425.00 90.00 155.01 154.71 6589.99 -1532.67 4936.99 5989543.55 544774.04 -1506.43 4944.66 10.08 89.00 5071.63 0.00 10.08 9450.00 90.00 157.53 157.23 6589.99 -1555.56 4947.05 5989520.72 544784.22 -1529.26 4954.84 10.08 89.00 5091.36 0.00 t0.08 9475.00 90.00 160.05 159.75 6589.99 -1578.86 4956.09 5989497.46 544793.39 -1552.52 4964.01 10.08 89.00 5110.41 0.00 10.08 9500.00 90.00 162.57 162.27 6589.99' -1602.54 4964.10 5989473.82 544801.52 -1576.16 4972.14 10.08 89.00 5128.72 0.00 10.08 9525.00 90.00 165.09 164.79 6589.99, -1626.55 4971.06 5989449.85 544808.61 -1600.13 4979.23 10.08 89.00 5146.26 0.00 t0.08 9550.00 90.00 167.61 167.31 6589.99 -1650.84 4976.96 59894.25.59 544814.64 -1624.39 4985.26 10.08 89.00 5163.01 0.00 10.08 9575.00 90.00 170.13 169.83 6589.99 -1675.37 4981.79 5989401.(19 544819.59 -1648.89 4990.21 10.08 89.00 5178.92 0.00 10.08 9600.00 90.00 172.65 172.35 6589.99 -1700.09 4985.53 5989376.39 544823.46 -1673.59 4994.08 10.08 89.00 5193.98 0.00 10.08 9625.00 90.00 175.17 174.87 6589.99 -1724.95 4988.18 5989351.55 544826.25 -1698.43 4996.87 10.08 89.00 5208.13 0.00 10.08 9650.00 90.00 177.69 177.39 6589.99' -1749.89 4989.74 5989326.61 544827.93 -1723.37 4998.55 10.08 89.00 5221.37 0.00 10.08 9675.00 90.00 180.21 179.91 6589.99 -1774.89 4990.20 59893(11.62 544828.52 -1748.36 4999.14 10.08 89.00 5233.67 0.00 10.08 9700.00 90.00 182.73 182.43 6589.991 -1799.88 4989.56 5989276.63 544828.01 -1773.35 4998.63 10.08 89.00 5244.99 0.00 10.08 9725.00 90.00 185.25 184.95 6589.99, -1824.82 4987.82 5989251.68 544826.40 -1798.30 4997.02 10.08 89.00 5255.32: 0.00 10.08 9750.00 90.00 187.77 187.47 6589.99 -1849.65 4984.98 5989226.83 544823.70 -1823.15 4994.32 10.08 89.00 5264.65 0.00 10.08 9775.00 90.00 190.29 189.99 6589.99 -1874.34 4981.06 59892{)2.12 54.4819.90 -1847.86 4990.52 10.08 89.00 5272.94 0.00 10.08 9780.74 90.00 190.87 190.57 6589.99 -1879.98 4980.01 5989196.,47 544818.88 -1853.51 4989.50 10.08 0.00 5274.70 0.00 10.1~ T.D. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COM,v~ISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of RequeSt/Abandon ~ Suspend _ Alter casing _ Repair well _ Plugging __ Change approved program _ Pull tubing 2. Name of Operator 5. Type of Well: Development X. ARCO Alaska, Inc. Exploratory __ 3. Address Stratigraphic __ P. O. BOX 100360, Anchorage, AK 99510 Service __ Operation Shutdown __ Re-enter suspended well_ Time extension_ Stimulate_ Variance Perforate Other -- 6. Datum elevation (DF or KB) 82' RKB feet 7. Unit or Property name Kuparuk River Unit 4. Location of well at surface 154' FNL, 139' FWL, Sec.20, T12N, R10E, UM At top of productive interval 1365' FNL, 1400' FEL, Sec. 20, T12N, R10E, UM At effective depth At total depth 1451' FNL, 1066' FEL, Sec 20, T12N, R10E, UM 8. Well number 1R-01 9. Permit number 85-175 10. APl number 50-029-21404 11. Field/Pool Kuparuk River 12. Present well condition summary Total Depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 115' Surface 4380' Intermediate Production 8535' Liner 8570' 6891' 8453' 6797' Size 16" 9.625" 7" feet feet feet feet Plugs (measured) None Junk (measured) None Cemented Measured depth True vertical depth 250 sx CS II 115' 115' 1250 sx PF'E' Ill 4380' 3867' & 420 sx PF'C' 250 sx Class G & 8535' 6864' 200 sx PF'C' Perforation depth: measured 8004'-8103',8199'-8245',8200'-8220',8289'-8300' true vertical 6446'o6523', 6597'-6634', 6598'-6614', 6668'-6678' Tubing (size, grade, and measured depth) 3.5", 9.3#, J-55 @ 7978', 2.875", 6.5#, J-55 @ 8136' Packers and SSSV (type and measured depth) Baker 'DB' Retr. Pkr @ 8126' and Camco HRP-1SP @ 7955', Camco SSSV TRDP-1A-SSA @ 1797' 13. Attachments Description summary of proposal X Detailed operation program BOP sketch 14. Estimated date for commencing operation November 1998 16. If proposal was verbally approved Name of approver Date approved ! Service 117. I hereby certify that the~ ~ foregoing is true//a/r¢l correct to the best of my knowledge. I Signed"~.~?*~"',--.-~_¢"._./,¢.c/' -- Title Kuparuk Drilling Team Leader I '"~. FOR COMMISSION USE ONLY 15. Status of well classification as: Oil X Gas_ Suspended_ Conditions of approval: Notify Commission so representative may witness Plug integrity _ BOP Test _ Location clearance Mechanical Integrity Test_ Subsequent form require 10- .Approved by the order of the Commission IApproval No. I Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE ARCO Alaska, Inc. 7:3-426 CHECK NUMBER 2050864 1 5 @39 AAI PAYABLES P.O. Box 102776 Anchorage, AK 99510-2776 PAY TO THE ALASKA DEPT OF REVENUE : ORDER OF: ALASKA OIL & GAS:CONSERVATION COMMI 3001 PORCUPINE DRIVE : The First NatiOnal Bank of Chicago-0710 Chicago, Illinois Payable Through Republic Bank Shelbyville, Kentucky NOVEMBER 4, 1998 *** 'VOID AFTER 90 DAYS : : i :. . ~ ' EXACTLY *********** 100. DOLLARS AND O0 CENTS.,~*** 0997579 ,100.00 TRACE NUMBER: 205086415 FIELD 8, POOL ............. ADMINISTRATION 1. INIT CLASS ENGINEERING P~ DATE __ WELL NAME ,,~_.~//.,~-"4::~/'/~ PROGRAM: exp [] dev~;J' redrl_.~lC'serv [] wellbore seg II ann. disposal para req, ! /"~?_~/ GEOL AREA ..... ~:::) uNI-I"#. ///~('.,> __. ON/OFF SHORE ~ ....... Permit fee attached ....................... 2. Lease number appropriate ................... 3~ Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well Iocaled proper dislance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficienl acreage available in drilling unil ............ 8. If deviated, is wellbore plat included ............... 9. Operalor only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued withoul conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... N N N Y N (~N (~N Y N ~N ~N N 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMl- vol adequate to circulate on conductor & surf csg 17. CM I- vol adequale to tie-in long string to surf csg ........ 18. CMl' will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ,~C~c:x-,,, psig. 27, Choke manifold complies w/APl RP-53 (May 8~' ........ 28. Work will occur without operation shutdown ........... ~ N 29. Is presence of H2S gas probable ................. N 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N/Y N --' '" 31. Data presenled on potential overpressure zones ....... Y/N" ,,~ j _,~ 32. Seismic analysis of shallow gas zones. ' ~y ~1,/'~.,-/, ~, 33. Seabed condition survey (if off-shore) ............. weekly progress reports ....... ,,/ Y N GEOLOGY AP__~R D/~TE/ 34. Contact name/phone for ANNULAR DISPOSAL 35. With proper cementing records, this~Dl~ (A) will contain wasJke' in a suita~eceiving zone; ....... APPR DATE (B) will not contamim~.~..fre~Ywater; or cause drilling waste... to,.surface; ~ _ _ (C) will'~bt'impair.~hanical~f the well used for disposal; (F)) will not da~e producing formation~r-'im~L~covery from a .................... pool; (E) will not circurnve, nt 20 AAC 25.252 or 20,,,AAC 25.412. , , , GEOLO,,GY: coMMIssION: ENGINEERING: ~ar BEW~¢~ '(/~,.~ WM / - JDH ,.--'"'t_-.-- / Y N Y N Y N Y N DWJ~ ~.. ,,~ RNC. '~. ~ co ,'~/~-N¢ - Comments/Instructions: M chekhsl ~ev 05129198 Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. T° improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Wed Jan 12 17:05:59 2000 Reel Header Service name ............. LISTPE Date ..................... 00/01/12 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 00/01/12 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Kuparuk MWD/MAD LOGS WELL NAME: API NUMBER: OPER3XTOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPEP~ATOR WITNESS: MWD RUN 2 AK-MM-90198 J. MARTIN M. WINFREE 1R-01a 500292140401 ARCO Alaska, Inc. Sperry Sun 12-JAN-00 RECEIVED 2000 MWD RUN 3 AK-MM-90198 J. PAINTER G. WHITLOCK MWD RUN 4 AK-MM-90198 P. SMITH GUY WHITLOCK JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: MWD RUN 5 AK-MM-90198 T. MCGUIRE G. WHITLOCK 12 10 FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 154 139 .00 79.90 45.20 REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.188 16.000 115.0 6.188 9.625 4380.0 6.188 7.000 6479.0 1. ALL DEPTHS ARE MEASURED DEPTHS UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. 3. MWD RUNS 2-5 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) . 4. DIGITAL DATA IS DEPTH CORRECTED TO THE PUC GR LOG (FUN GR OF 08/26/85) WITH KBE = 82' A.M.S.L. KICKOFF POINT FOR THIS WELLBORE IS 6479'MD, 5315'TVD (TOP OF WHIPSTOCK). 5. MWD RUNS 1-5 REPRESENT WELL 1R-01A WITH API#: 50-029-21404-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12171'MD, 6678'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA PAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE N-UMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SIIMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 6464.5 12127 0 RPD 6470 5 12133 5 RPM 6470 5 12133 5 RPS 6470 5 12133 5 RPX 6470 5 12133 5 ROP 6509 0 12171 0 FET 6566 0 12133 5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 6464 5 6469 0 6470 5 6472 0 6475 0 6479 5 12171 0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ REMARKS: GR 6464 0 6468 5 6471 5 6473 0 6476 0 6480 0 12171 5 EQUIVALENT UNSHIFTED DEPTH Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Al~sent value ...................... -999 MERGED MAIN PASS. $ BIT RUN NO MERGE TOP MERGE BASE 200 6518.0 6603.0 300 6603.0 7128.0 400 7128.0 7827.0 500 7827.0 12171.0 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units DEPT FT ROP MWD FT/H GR MWD API RPX MWD OHMM RPS MWD OHMM RPM MWD OHMM RPD MWD OHMM FET MWD HOUR Size Nsam Rep Code Offset Channel 4 1 68 0 1 4 1 68 4 2 4 1 68 8 3 4 1 68 12 4 4 1 68 16 5 4 1 68 20 6 4 1 68 24 7 4 1 68 28 8 Name Service Unit Min Max DEPT FT 6464.5 12171 ROP MWD FT/H 0 2717.72 GR MWD API 25.27 525.81 RPX MWD OHMM 0.06 1449.23 RPS MWD OHMM 0.06 968.32 RPM MWD OHMM 0.43 2000 RPD MWD OHMM 0.2 2000 FET MWD HOUR 0.11 25 Mean Nsam 9317.75 11414 63.8434 11325 83.3606 11326 20.515 11327 22.6187 11327 28.9083 11327 33.981 11327 1.71766 11136 First Reading 6464.5 6509 6464.5 6470.5 6470.5 6470.5 6470.5 6566 Last Reading 12171 12171 12127 12133.5 12133.5 12133.5 12133.5 12133.5 First Reading For Entire File .......... 6464.5 Last Reading For Entire File ........... 12171 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: R_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMNLARY VENDOR TOOL CODE START DEPTH GR RPX RPS RPM RPD ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 6464 0 6471 0 6471 0 6471 0 6471 0 6509 5 SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 6559 0 6566 0 6566 0 6566 0 6566 0 6603 0 30-NOV-99 Insite 0.41 Memory 6606.0 42.0 42 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P1385GR4 P1385GR4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.188 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPEP~ATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTP~ATE AT MT: MUD CAKE AT MT: Water Based 10.90 47.0 8.5 500 4.0 1.900 1.460 1.700 2.100 78.0 103.4 78.0 78.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA_N/DOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 2 FT/H 4 1 68 4 2 GR MWD 2 API 4 1 68 8 3 RPX MWD 2 OHMM 4 1 68 12 4 RPS MWD 2 OHMM 4 1 68 16 5 RPM MWD 2 OHMM 4 1 68 20 6 RPD MWD 2 OHMM 4 1 68 24 7 Name Service Unit Min Max DEPT FT 6464 6603 ROP MWD 2 FT/H 0 1898.27 GR MWD 2 API 53.83 98.73 RPX MWD 2 OHMM 0.06 1449.23 RPS MWD 2 OHMM 0.06 968.32 RPM MWD 2 OHMM 0.43 2000 RPD MWD 2 OHMM 0.2 2000 Mean Nsam 6533.5 279 96.5141 188 77.6918 191 19.4367 191 13.1296 191 114.756 191 66.4191 191 First Reading 6464 6509.5 6464 6471 6471 6471 6471 Last Reading 6603 6603 6559 6566 6566 6566 6566 First Reading For Entire File .......... 6464 Last Reading For Entire File ........... 6603 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 6560 5 FET 6566 5 RPX 6567 5 RPD 6567 5 RPM 6567 5 RPS 6567 5 ROP 6603 5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MI/D PH: MUD CHLORIDES (PPM) : STOP DEPTH 7088 5 7095 5 7095 5 7095 5 7095 5 7095 5 7131 5 02-DEC-99 Insite 0.41 Memory 7128.0 13.5 42.1 TOOL NUMBER P1385GR4 P1385GR4 6.188 Water Based 10.90 45.0 9.0 50O FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPER3tTURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 4.4 2.000 1.510 1.700 2.200 76.0 102 . 8 76.0 76.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 3 FT/H 4 1 68 4 2 GR MWD 3 API 4 1 68 8 3 RPX MWD 3 OHMM 4 1 68 12 4 RPS MWD 3 OHMM 4 1 68 16 5 RPM MWD 3 OHMM 4 1 68 20 6 RPD MWD 3 OHMM 4 1 68 24 7 FET MWD 3 HOUR 4 1 68 28 8 Name Service Unit DEPT FT ROP MWD 3 FT/H GR MWD 3 API RPX MWD 3 OHMM RPS MWD 3 OHMM RPM MWD 3 OHMM RPD MWD 3 OHMM FET MWD 3 HOUR Min 6560.5 1.05 42 47 1 04 1 02 0 98 1 O9 0 11 Max Mean Nsam 7131.5 6846 1143 130.26 58.483 1057 158.96 109.206 1057 10.14 2.15072 1057 9.63 2.1209 1057 8.33 2.09505 1057 5.5 2.1143 1057 4.38 1.45416 1059 First Readinc 6560 6603 6560 6567 6567 6567 6567 6566 Last Readin~ 7131 5 7131 5 7O88 5 7095 5 7095 5 7095 5 7095 5 7095 5 First Reading For Entire File .......... 6560.5 Last Reading For Entire File ........... 7131.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NI/MBER: 4 P_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 7089 0 7784 5 FET 7096 0 7791 5 RPX 7096 0 7791 5 RPS 7096 0 7791 5 RPD 7096 0 7791 5 RPM 7096 0 7791 5 ROP 7132 0 7827 5 $ LOG HEADER DATA DATE LOGGED: 04-DEC-99 SOFTWAiqE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 0.41 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) : 7827.0 TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 17.8 MAXIMUM ANGLE: 43.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPEP~ATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ........................ Datum Specification Block sub-type...0 TOOL NUMBER P1385GR4 P1385GR4 6.188 Water Based 10.90 43.0 9.0 450 4.4 1.800 1.170 1.700 2.100 74.0 116.6 74.0 74.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 4 FT/H 4 1 68 4 2 GR MWD 4 API 4 1 68 8 3 RPX MWD 4 OHMM 4 1 68 12 4 RPS MWD 4 OHMM 4 1 68 16 5 RPM MWD 4 OHMM 4 1 68 20 6 RPD MWD 4 OHMM 4 1 68 24 7 FET MWD 4 HOUR 4 1 68 28 8 Name Service Unit DEPT FT ROP MWD 4 FT/H GR MWD 4 API RPX MWD 4 OHMM RPS MWD 4 OHMM RPM MWD 4 OHMM RPD MWD 4 OHMM FET MWD 4 HOUR Min 7089 0 77 46 68 0 81 0 76 0 76 0 79 0 52 Max 7827.5 222 84 525 81 6 36 5 07 4 83 4 36 19 29 Mean Nsam 7458.25 1478 61.3444 1392 163.295 1392 1.97998 1392 1.95557 1392 1.94231 1392 1.97404 1392 1.97874 1392 First Reading 7089 7132 7089 7096 7096 7096 7096 7096 Last Reading 7827 5 7827 5 7784 5 7791 5 7791 5 7791 5 7791 5 7791 5 First Reading For Entire File .......... 7089 Last Reading For Entire File ........... 7827.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 ' File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 7785.0 RPD 7792.0 RPM 7792.0 RPS 7792.0 RPX 7792.0 FET 7792.0 ROP 7828.0 $ STOP DEPTH 12127.5 12134 0 12134 0 12134 0 12134 0 12134 0 12171 5 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/~DOFF (IN) : EWR FREQUENCY (HZ) : REMJARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 12-DEC-99 Insite 0.41 Memory 12171.0 47.3 98.1 TOOL NUMBER P1376GR4 P1376GR4 6.188 Water Based 11.00 41.0 8.5 5O0 2.5 2.000 1.940 1.450 2.500 68.0 156.0 68.0 68.0 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEFT FT 4 1 68 0 1 ROP MWD 5 FT/H 4 1 68 4 2 GR MWD 5 API 4 1 68 8 3 RPX MWD 5 OHMM 4 1 68 12 4 RPS MWD 5 OHMM 4 1 68 16 5 RPM MWD 5 OHMM 4 1 68 20 6 RPD MWD 5 OHMM 4 1 68 24 7 FET MWD 5 HOUR 4 1 68 28 8 Name Service Unit Min Max DEFT FT 7785 12171.5 ROP MWD 5 FT/H 0 2717.72 GR MWD 5 API 25.27 133.53 RPX MWD 5 OHMM 2.84 111.07 RPS MWD 5 OHMM 2.82 99.74 RPM MWD 5 OHMM 2.78 1951.84 RPD MWD 5 OHMM 2.88 2000 FET MWD 5 HOUR 0.54 25 Mean Nsam 9978.25 8774 64.189 8688 67.5292 8686 25.748 8685 28.6381 8685 34.7777 8685 42.098 8685 1.70794 8685 First Reading 7785 7828 7785 7792 7792 7792 7792 7792 Last Reading 12171.5 12171.5 12127.5 12134 12134 12134 12134 12134 First Reading For Entire File .......... 7785 Last Reading For Entire File ........... 12171.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/01/12 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 00/01/12 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 00/01/12 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKI~OWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File