Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout198-237 (
Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning proiect.
They are available in the original file and viewable by direct inspection.
//~" ~ ~' ~ File Number of Well History File
PAGES TO DELETE Complete
RESCAN
,Gdlor items - Pages:
Grayscale, halftones. Dictums, graphs, charts-
Pages
Poor Quality Original - Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
Logs of various kinds
[] Other
COMMENTS:
Scanned by: Beverly Diann~'~~athan Lowell
[] TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Dianna Vincent ~~..Lowell
Memorandum
State of Alaska
Oil and Gas Conservation Commission
To' Well File: Kuparuk Riv Unit 1R-01A Permit # 198-237
January 13,2001
Re~
Administrative Abandonment Action
Kuparuk Riv Unit 1R-01A Permit # 198-237
This memo will remain at the front of the subject well file.
Well 1R-01A was replaced by 1R-01B (permit # 200-156, AP1 # 50-029-21404-02) when the permit was
approved 10/05/2000. The replacement well incorporates an extension to a new bottom hole location
using the existing well bore. This extension, along with the original hole, will be used for production of
hydrocarbons. A review of both well files indicates administrative abandonment of the originating well
bore is appropriate according to current AOGCC procedures for wells where additional permitted
extension is drilled from an existing well bore.
20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data
bases require each conductor has only one permit number and AP1 number. Administrative
abandonment of the original permit only eliminates duplication in the databases. Information for the
original well and its replacement will be maintained in their respective files.
Statistical Technicia~,tl,-~__,~ j~~Reservoir Engineer
The operator has been notified of this action. All future correspondence with the AOGCC should reflect
the new permit number, API number and well data.
Permit to Drill No. 1982370
DATA SUBMITTAL COMPLIANCE REPORT
2/5/2002
Well Name/No. KUPARUK RIV UNIT IR-01A Operator PHILLIPS ALASKA INC.
APl No. 50-029-21404-01-00
MD 12171 TVD 6678 Completion Date 2/17/2000 Completion Status l-OIL Current Status ADMA UIC N
REQUIRED INFORMATION
Mud Log N._9_o Samples N~o Directional Survey ~ x,/2.4~ ,
-2~2__~ - _-.._5~_._~ ~_~2£,' ~_ 2- ~_ ~'2__~___-i~--_2 __ ._2~-.7.7__-~-~-'2 ~2~._-'£'-2 5'?Y~--~ '~-~__- C'_-~£2-~--__-_~_.~ 2~ _~2. ..... ~'_5~2--~'~-~_21 .................... ~--.~ 7~ ~_~ ~C-'--'~ _._2~ ~ ~ '~i'"i ~_7~__-.-~ __ '" -'~-'~ '-- '2''
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/ lnterval
Data Digital Digital Log Log Run OH /
Type Media Format Najne Scale Media No Start Stop CH
;-L'~'''~ 3W~.~P'~P/~s'ci~'~ ................. 5 .................... I~IN,~L .....6080 8'158'
(data taken from Logs Portion of Master Well Data Maint)
Dataset
Received Number Comments
C'H ' 2/4/~000
~k"" SCMT ~,) ~ ),6~ ~ 5 FINAL 6080 8158 CH 2~4~2000 BL(C)
~'"". RST-WFL 5 FINAL 7800 10243 CH 5/12/2000
tL,'/ DGR/EWR4-MD L,-'"" 25 FINAL 6479 12171 OH 2/16/2000 '-~
~ PDC/GR/CCL / ~,~/'~ ~t~5 FINAL 8460 '10720 CH 5/31/2000
L~'''' PDC/GR/CCL/?/%~, ,~.~.¢'~ 5 FINAL 8400 10184 CH 5/31/2000
C 5/31/2000 09614..,," 8470-10720 ~'~., '~'-~
Q:.~-- DGR/EWR4-TVD t,/' 25 FINAL 5315 6711 OH 2/16/2000t,~
R SRVY RPT 90 12171 OH 1/6/2000 SPERRY 6397..
,L--'"~'SCMT (..~ i~;:'~;, ?-&~',~ 5 FINAL 7670 10700 CH 3/14/2000.' BL(C)
q// ' O 1/26/2000 09095~/ 6464-12127
~/ C 5/31/2000 09615L,//8404-10185 ,~t:,~.;. ~r..~.~,.~
Well Cores/Samples Information:
Interval Dataset
Name Start Stop Sent Received Nnmber Comments
ADDITIONAL INFORMATION
Well Cored? Y/(~
~C_hips-l~¢o'} . . "
.A.~a. ly~s_Reeeh~e~. ~d-N
Daily History Received? ~N
Formation Tops Receuived? (~-~/N
DATA SUBMITTAL COMPLIANCE REPORT
2/5/2002
Permit to Drill No. 1982370 Well Name/No. KUPARUK RIV UNIT IR-01A Operator PHILLIPS ALASKA INC. AP! No. 50-02%21404-01-00
MD 12171 TVD 6678 Completion Date 2/17/2000 Completion Status 1-OIL Current Status
Comments:
ADMA UIC N
~_~'Z_%L%%L-&_~7._~-L--_~Z_-.~_ZZT---~-?_£%_q_. Z-~C~L~-'C~.%Y_~-_ZZ2'L.L_-_LL%2_.X.ZZ_.'.Z_-ZZZE.Z~ ................................ TL.7_ ..~'Z-.___-Z'ZZ' ._% Z. ZL.ZZ~..%%Zi X'iL_'%'-.Z-.-__~_Z__.%Z_Z 1%TZZi ........ - ........
Compliance Reviewed By: ............................. Date: .......
Schlumberger
NO. 153
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Kuparuk
Color
Well Job # Log Description Date BL Sepia Print CD
3K-02 t.~lC_. INJECTION PROFILE 000509 I 1
30-17 ~ INJECTION PROFILE 000509 I 1
1R-01A ~ ~/~ IV 20087 MGR/CCL 000215 I I 1
1R-01A ~. ¢~t~ ~- 20088 MGR/CCL 000217 I I I
RECEIVED
s~.~: ~^~: M,~.v. ~ !
Cons.
Commission
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907J~-.~3q~lT&
5/23/00
Schlumberger
NO. 110
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Kuparuk
Color
Well Job # Log Description Date BL Sepia Print
1 L-26A GAMMA RAY COLLARS 000427 I 1
1Q-06 LEAK DETECTION LOG 000425 I 1
1Y-12 L4~ (eL- INJECTION PROFILE 000418 I 1
1 R-01A RST WFL W/PROD PROFILE 000423 I I
SIGNE DATE:
Alaska Oil & Gas Cons. Commission
Please sign and return one'~opy of this transmittal to Sherrie at the above address or fax to (907) 561-8317, TImbrElS.e
5/3/OO
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
April 27, 2000
Mr. Robert Christenson
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
/,~ R 2 8 2000
gJa~ 0ii & Gas Cons, Commi~io~
Subject: 1R-01A (Permit No. 198-237) Well Completion Report
Dear Mr. Commissioner:
Enclosed is the well completion report for the completion on KRU 1R-01A.
If there are any questions, please call 265-6120.
Sincerely,
Graham L. Alvord
Kuparuk Drilling Team Leader
AAI Drilling
GLA/skad
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of well Classification of Service Well
Oil [~ Gas F~ Suspended D Abandoned E] Service D'~; ..... .~- ,_
· ~ '.~-,--vc, ....... ~'~
2. Name of Operator ~ ~?~-~-**i0~~ 7. Permit Number
ARCO Alaska, Inc. ~,~'~-'~'~ ~ 198-237
3. Addr~s: -~.'-...' --~ ~ ~ ;~;~:4-%~,~:'*~ 8. APl Number
P. O. Box 100360, Anchorage, AK 99510-0360 '¥:~v. ~'~L~'.~ 50-029-21404-01
4. Location of well at sudace ' :-"-"~-~*~.'"-:~,- 9. Unit or Lease Name
154' FNL, 139' FWL, Sec. 20, T12N, R10E, UM (ASP: 539829.8, 5991050.1) Kuparuk River Unit
At Top Producing Inte~al 10. Well Number
1957' FNL, 1997' FEL, Sec. 20, T12N, R10E, UM (ASP: 542986, 5989267) 1R-01A
A tTotal Depth. ,~,/~ 11. Field and Pool
266' FNL, 2315' FWL, Sec. 29, T12N, R10E, UM (ASP: 542049.7, 5985673) , .,.~__,_: Kuparuk River Field
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease D~ignation and Serial No. . ;:.., ~~ Kuparuk River Oil Pool
82' RKB feet~ ADL 25635 ALK 2568 - -
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. ~15. Water Depth, if o~hore 16. No. of Completions
November 28, 1999 December 13, 1999 December 24, 1999~ WA feet MSL 1
~17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Suwey ~20. Depth where SSSV set 21. Thickn~ of Permafrost
12171' MD / 6678' TVD 10850' MD / 6702' TVD :YES ~ No ~~ WA feet MD 1900' (approx)
22. Type Electric or Other Logs Run
~ G~Res, CCL
23. CASING, LINER AND CEMENTING RECORD
S~ING DE~H MD
CASING SIZE ~. PER ~. G~DE TOP BOSOM HOLE SIZE CEME~ING RECORD~ AMOUNT PULLED
16" 62.5~ H-40 Sudace 115' 24" 250 sx CS II
9.625" 36~ J-55 Sudace 4380' 12-1/4" 1250 sx PF E III & 420 sx PFC
7" 26~ J-55 Suda~ 6479' 8-1/2" 65 sx Cla~ G
3.5" 9.3~ L-80 6243' 10915' 6.125" 475 sx Cla~ G
24. Pedorations open to Production (MD + TVD of Top and BoSom and 25. TUBING RECORD
inte~al, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
3.5" 6285' 6243'
10011'-10350' MD 6704'-6698' TVD 4 spf 26. ACID, F~CTURE, CEMENT SQUEEZE, ETC.
9338'-9390' MD 6720'-6718' TVD 4 spf DE~H INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9403'-9850' MD 6718'-6714' TVD 4 spf N/A
8588'-8665' MD 6685'-6700' TVD 4 spf
8868'-9232' MD 6709'-6718' TVD 4 spf
27. PRODUCTION TEST
Date First Production ,Method of Operation (Flowing, g~ lift, etc.)
March 7, 2000 Flowing
Date of T~t Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
4/20/2000 12.0 Test Period > 316 268 396 209~ 581
Flow Tubing Casing Pr~sure Calculated OIL-BBL GAS-MCF WATER-BBL OIL G~VI~ - APl (cmO
215 psi 1332 24-Hour Rate > 632 536 792 24°
28. CORE DATA
Brief d~cription of lithology, porosi~, fracture, apparent dips and presence of oil, g~ or water. Submit core chips.
No Cores
/.?R 2 8 2000
Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate
29.
NAME
GEOLOGIC MARKERS
TRUE VERT. DEPTH
Top Kuparuk D
Top Kuparuk A
MEAS. DEPTH
7682'
8360'
6365'
6639'
30.
FORMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity.
GOR, and time of each phase.
Annulus left open - freeze protected with dies
31. LIST OF A-FI-ACHMENTS
Summary of Daily Operations, Directional Survey
32. I hereby certify that the following is true and correct to the best of my knowledge. Questions? Call Bill Lloyd 265-6531
Signed /~,.- ~-- ~'-¢ Title DrillinaEnaineerinaSuDervisor Date
G. Alvord
INSTRUCTIONS
Prepared by Sharon AIIsup-Drake
General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and
leases in Alaska.
Item 1' Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Oth er-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
Date: 02/04/00
ARCO ALASKA INC.
WELL SUMMARY REPORT
Page: 1
WELL:iR-01A
WELL_ID: AK0037 TYPE:
STATE:ALASKA
COUNTY: NORTH SLOPE EAST
FIELD: KUPARUK RIVER UNIT
SPUD:il/25/99 START COMP:
RIG:POOL 6 WI: 0% SECURITY:0
BLOCK:
FINAL:
API NUMBER: 50-029-21404-01
11/23/99 (D1)
TD/TVD: 0/0
SUPV:FRED HERBERT
MW: 0.0 VISC:
0) MOVE TO iR PAD.
0 PV/YP: 0/ 0
Prepare rig for move to 1R-01 ST.
APIWL: 0.0
11/24/99 (D2)
TD/TVD: 115/115
SUPV:FRED HERBERT
MW: 0.0 VISC:
( 115) SPOT MODULES
0 PV/YP: 0/ 0
APIWL: 0.0
Continue to rig down and move rig to iR pad. Hold PJSM.
11/25/99 (D3)
TD/TVD: 0/115
SUPV:FRED HERBERT
MW: 11.7 VISC: 68 PV/YP: 30/31
0) TESR BOPE
APIWL: 6.0
Set rig over well. Rig accepted @ 1500 hrs. Open well,
displace well with mud. Shut down and check for flow. Well
static on both sides.
11/26/99 (D4)
TD/TVD: 0/115
SUPV:FRED HERBERT
MW: 11.7 VISC: 67 PV/YP: 28/32
0) P/U DP
APIWL: 5.8
NU BOPE and test to 250/3500 psi. PJSM. Pull tubing.
11/27/99 (D5) MW: 10.8 VISC: 68 PV/YP: 21/34 APIWL: 5.6
TD/TVD: 0/115 ( 0) CUT WINDOW
SUPV:FRED HERBERT/ M. WINFREE
PJSM. Run bridge plug and set @ 6505'. Test casing to 3500#,
OK. PU whipstock.
11/28/99 (D6) MW: 10.8 VISC: 49 PV/YP: 18/16 APIWL: 5.6
TD/TVD: 6508/5335 (6508) WOC ~
SUPV:FRED HERBERT/ M. WINFREE
RIH with Whipstock. Cut window from 6479' to 6491', drill
to 6508'. Circ weighted sweep around. Observe well flowing
a small amount, set back 1 stand to keep TD from freezing.
Shut in well. Circ out thru choke, no gas no oil. Lost 30
bbl while going thru choke, flow back thru choke. Circ and
condition mud, weight up to 10.8 hvy. Perform LOT, 12 ppg
EMW. Monitor well, OK. ~ ,.~..~.
Date: 02/04/00
ARCO ALASKA INC.
WELL SUMMARY REPORT
Page: 2
11/29/99 (D7) MW: 10.8 VISC: 54 PV/YP: 24/20 APIWL: 6.6
TD/TVD: 6519/5342 ( 11 PU DP
SUPV:FRED HERBERT/ M. WINFREE
Circ prep for squeeze. PJSM. Test lines to 2500#. Pump
cement. Perform squeeze. Drill firm cement to 6508 new
formation to 6519' Perform LOT, 12.5 ppg EMW.
11/30/99 (D8) MW: 10.9 VISC: 44 PV/YP: 15/25 APIWL: 4.0
TD/TVD: 6519/5342 ( 0) M/U BHA
SUPV:G.R. WHITLOCK/ M. WINFREE
P/U 4" D.P. Break circ. Stop pump and slide through window
w/no drag or bobble. Start pump and rotate last 10' of
hole. Drill from 6518' to 6550'. Motor stalling frequently.
Displace LSND mud w/GEM mud. Drill from 6550' to 6606'
Circ and condition mud.
12/01/99 (Dg) MW: 10.9 VISC: 45 PV/YP: 17/33 APIWL: 4.2
TD/TVD: 6995/5860 ( 476) CIRC TO CLEAN HOLE
SUPV:G.R. WHITLOCK
RIH. Retake surveys 8 6546' and 6573'. Wash to bottom clean
up possible junk. Drill from 6670' to 6798'. Take
additional surveys. Drill from 6798' to 6995'
12/02/99 (D10) MW: 10.9 VISC: 43 PV/YP: 18/26 APIWL: 4.4
TD/TVD: 7144/5892 (149) DRILLING ~ 7300'
SUPV:G.R. WHITLOCK
Drill from 6995' to 7108' Circ to clean hole and lower
ECD's. Circ weighted sweep ~ 12.9 ppg. Drill from 7108' to
7128'. Motor stalling. CBU. POOH change bit. RIH. Held
safety drill. RIH. CBU. Drill from 7128' to 7144'
12/03/99 (Dll) MW: 10.9 VISC: 42 PV/YP: 17/25 APIWL: 3.8
TD/TVD: 7826/6471 ( 682) TEST BOPE
SUPV:G.R. WHITLOCK
Drill from 7144' to 7826'. CBU Monitor well. POOH.
12/04/99 (D12) MW: 10.9 VISC: 41 PV/YP: 18/25 APIWL: 3.8
TD/TVD: 7890/6509 ( 64) DRILLING ~ 8010'
SUPV:G.R. WHITLOCK
POOH to 6400'. Held Safety meeting. POOH, Test BOPE to
250/3500 psi. RIH. Wash to bottom. CBU to condition mud.
Drill from 7826' to 7890'
12/05/99 (D13) MW: 10.9 VISC: 41 PV/YP: 20/24 APIWL: 3.6
TD/TVD: 8560/6676 ( 670) DRILLING ~ 8816'
SUPV:G.R. WHITLOCK
Drill from 7898' to 8560' ~~%~'~ ?~ ...... ~'?
.... 2000
· ... ~ ~ ~'
Date: 02/04/00 ARCO ALASKA INC. Page: 3
WELL SUMMARY REPOR~ .... ~ ....... ~ ~ ..... ....
12/06/99 (D14) Nr~: 10.9 vxsc: 39 PV/YP: 14/24 APIWS: 3.4
TD/TVD: 9266/6270 ( ?06) DRILLING 6 9440'
SUPV:G.R. WHITLOCX
Drill from 8560' to 9100' Circ hi-wt sweep. Pump dry job.
POOH from 9100' to 7500' Fill pipe and wash last 2 stands
to bottom. Drill from 9100' to 9266'
12/07/99 (D15) MW: 10.9 VISC: 38 PV/YP: 13/23 APIWL: 3.4
TD/TVD: 9923/66712 ( 657) DRILLING ~ 10067'
SUPV:G.R. WHITLOCK
Drill from 9266' to 9890' Unable to slide ~ 9890'. Circ
and condition mud. Pump hi-vis sweep w/nut plug. Added
lubetex to mud and drag dropped back. Drill from 9890' to
9923'
12/08/99 (D16) MW: 11.1 VISC: 41 PV/YP: 14/27
TD/TVD:10258/6696 (335) DRILLING ~ 10448'
SUPV:G.R. WHITLOCK
APIWL: 3 . 2
Circ and work pipe while taking surveys. Drill from 9923'
to 10156' Circ barafibre sweep. Circ and increase MW to
11.1 ppg. Pump out of hole from 10156' to 8812' Pump dry
job and POOH to 6479'. RIH. Wash and ream last 2 stands to
bottom. Drill from 10156' to 10258'
12/09/99 (D17) MW: 11.1 VISC: 40 PV/YP: 18/28
TD/TVD:l1026/6690 i 768) DRILLING ~ 11185'
SUPV:G.R. WHITLOCK
Drill from 10258' to 11026'. PJSM.
AP IWL: 2.7
12/10/99 (D18) MW: 11.0 VISC: 41 PV/YP: 19/27
TD/TV]D:l1386/6650 ( 360) DRILLING ~ 11510'
SUPV:G.R. WHITLOCK
APIWL: 2.7
Drill from 11026'-11280'. CBU w/weighted sweep. Monitor
well. POOH to 8976' Hole tight from 10915' to 10738' Hole
slick above previous wiper trip point. RIH. W/R through
bridge ~ 10900'. W/R to bottom w/no more problems. Drill
from 11280' to 11386'
12/11/99 (D19) MW: 11.0 VISC: 41 PV/YP: 18/28 APIWL: 2.5
TD/TVD:l1954/6670 ( 568) DRILLING ~ 12060'
SUPV:G.R. WHITLOCK
Drill from 11386' to 11954'. Circ and condition mud.
12/12/99 (D20) MW: 11.0 VISC: 42 PV/YP: 19/29
TD/TVD:12171/6670 ( 217) CIRC AND SPOTTING LINER RUNNING PILL
SUPV:G.R. WHITLOCK
APIWL: 2 . 5
Drill from 11954' to 12171' Pump weighted sweep. Pump out
of hole from 12171' to 8907'. Hole tight ~ 10900', 10820',
10730'. Break circ, pump dry job, and blowdown topdrive.
POOH to shoe. tight spot ~ 7700'. CBU. No gas on bottoms
up. RIH to 11892'. Ream from 11892' to 12052'
Date: 02/04/00
ARCO ALASKA INC.
WELL SUMMARY REPORT
Page: 4
12/13/99 (D21)
TD/TVD:12171/66707 (
SUPV:G.R. WHITLOCK
MW: 11.0 VISC: 55 PV/YP: 20/42
0) DOWNLOADING MWD
APIWL: 2.5
Wash from 11985'-12171' Pump weighted sweep. POOH to
11700' CBU. Spot 280 bbl liner pill. POOH to 8817'. Hole
not taking correct fill. Monitor well, no flow. RIH. Pump
out of hole 35 stds. Hole took proper fill. POOH. Tight
from 7690' to 7730' Well dead. Pump out of hole 5 stands to
shoe.
12/14/99 (D22) MW: 11.0 VISC: 47 PV/YP: 23/31 APIWL: 2.8
TD/TVD:12171/66707 ( 0)
SUPV:FRED HERBERT
Pump out of hole. Monitor well ~ shoe. Hold PJSM. Run 3.5"
liner. Break circ every 1500' Pick up packer & liner
hanger.
12/15/99 (D23)
TD/TVD:12171/66707 (
SUPV:FRED HERBERT
MW: 11.0 VISC: 48 PV/YP: 24/30
0) RIH W/ CLEAN OUT ASSY.
APIWL: 3.0
RIH to 6364' w/liner. Circ & cond. mud. RIH w/liner, hit
bridge ~ 7960' Circ and work liner down to 8010'(hard).
Work liner up to 7998', set back stand, continue working
liner up to 7975'. Circ continue working liner up. Liner
moving up. Continue pumping out of hole to liner hanger.
POOH w/3.5" liner. Set test plug. Test BOPE to 250/3500.
Clean out assy.
12/16/99 (D24)
TD/TVD:12171/6670 (
SUPV:FRED HERBERT
MW: 11.0 VISC: 43 PV/YP: 14/26
0) WASH & REAM WITH HOLE OPENER
APIWL: 3.4
RIH w/clean out assy. Ice plugs in DP, thaw out same, to
6443' Circ & cond mud ~ window. RIH to 7691' Wash & ream
from 7691' to 8173' Hole packing off & tight @ 8173'. Set
back stand, rotate, recip pipe, circ bttms up. Wash & ream
thru intervals that were packing off from 8173' to 8750'
PJSM. Wash and ream from 8750' to 9133'
12/17/99 (D25)
TD/TVD:12171/6670 (
SUPV:FRED HERBERT
MW: 11.2 VISC: 48 PV/YP: 18/34
0) WIPER TRIP
APIWL: 2.8
Circ densified barofiber sweep around. Wash from 9133' to
9998' Wash & ream from 9998' to 10095'. Circ sweep around
~ 10095' Wash from 10095' to 10672' Packing off ~ 10672'
ream & clean up hole. Wash & ream from 10672' to 11862'
Hole packing off ~ 10672' to 11050' & 11633' to 11826'
Date: 02/04/00
ARCO ALASKA INC.
WELL SUMMARY REPORT
Page: 5
12/18/99 (D26)
TD/TVD:12171/6670
SUPV:FRED HERBERT
MW: 11.2 VISC: 46 PV/YP: 21/32
0) WORK ON SCR PROBLEMS
APIWL: 2.8
Wash & ream from 11826' to 12171' Circ & cond mud, pump
sweep. Monitor well, pump out of hole from 12171' to 6407'
Hole in good shape. Recondition commutator on drawworks 'B'
motor, replace brush holder on 'A' motor. RIH. Drawworks
'A' motor would not operate. POOH to window. Work on SCR 1
& 2. RIH to 8562' stop to fill pipe, lost power to
drawworks & mud pumps, SCR's would not assign. Rig up to
circ w/injection pump. Circ & rotate pipe. Work on SCR's.
12/19/99 (D27) MW: 11.2 VISC: 45 PV/YP: 18/35 APIWL: 2.6
TD/TVD:12171/6670 ( 0) WORK ON SCR'S
SUPV:FRED HERBERT
Work on SCR's. Circ w/injection pump & rotate pipe. POOH
from 8526' to 6407' Trouble shoot SCR problems, check
traction motors.
12/20/99 (D28)
TD/TVD:12171/6670 (
SUPV:FRED HERBERT
MW: 11.2 VISC: 44 PV/YP: 17/35
0)POOH TO RUN LINER
APIWL: 2.4
Work on SCR's. Work pipe, SCR failed. Continue to work on
SCR. Trip in hole to 8137' Bridge ~ 8137'. Ream thru
bridge, circ bottoms up. RIH to 10062'. No hole problems.
Circ & cond mud @ 10062'. RIH to 11979'. Ream from 11979'
to 12171'
12/21/99 (D29)
TD/TVD:12171/6670 (
SUPV:FRED HERBERT
MW: 11.2 VISC: 45 PV/YP: 21/31
0) RUN LINER, P/U HANGER
APIWL: 2.6
Circ & cond mud for liner job. POOH for liner. Pump out.
Tight spots ~ 8140', 7690' Circ bttms up ~ 7600'. Continue
w/POOH, pump out to window. Tight ~ 7540' work thru spot.
Circ bttms up ~ window. POOH to run liner. Hold PJSM. Run
3.5" liner.
12/22/99 (D30)
TD/TVD:12171/6670 (
SUPV:FRED HERBERT
MW: 11.2 VISC: 45 PV/YP: 21/33
0) POOH W/ RUNNING TOOL
APIWL: 2.4
RIH w/liner. RIH w/hanger/packer assembly. Circ & cond mud
~ window. RIH w/liner work thru tight spots ~ 7130', 7917',
8300' Circ bttms up @ 8300'. RIH w/liner, wash down each
stand to 10292' Circ hole clean @ 10292' RIH w/liner.
Bridge ~ 10915' Hole packing off. Circ & work pipe until
pack off cleared up. Attempt to work thru bridge ~ 10915'
w/ no success. Pump Lube Tex pill. Can move string up but
not down past 10915'
Date: 02/04/00
ARCO ALASKA INC.
WELL SUMMARY REPORT
Page: 6
12/23/99 (D31)
TD/TVD:12171/6670 (
SUPV:FRED HERBERT
12/24/99 (D32)
TD/TVD:12171/6670
SUPV:FRED HERBERT
12/25/99 (D33)
TD/TVD:12171/6670 (
SUPV:FRED HERBERT
MW: 11.2 VISC: 46 PV/YP: 22/32
0) RIH W/ PACKER ASSY & OVERSHOT
APIWL: 2.6
Attempt to work liner down. PJSM. Pump cement. Bump plug.
Check floats. Release f/hanger. Circ & cond. No cement or
spacer to surface. POOH. RIH w/tubing cutter. Cut liner @
6315'. RIH w/spear assembly. Latch on to liner. Circ bttms
up. Pump slug. POOH w/liner packer assy & liner.
MW: 8.6 VISC: 28 PV/YP: 1/ 0
0) FREEZE PROTECT WELL
APIWL: 0.0
POOH to PKR. liner. RIH w/overshot to top of stub(6315') .
Latch on to stub. Pressure to check pack off. Pressure up &
set hanger. Set packer. Circ bttms up. POOH. Test casing to
3000 psi. PJSM. Run 3.5" tubing. Sting into PBR. Circ bttms
up to remove thick mud. Displace well.
MW: 8.6 VISC: 28 PV/YP: 1/ 0
0) RIG RELEASED F/ 1R-01A ~ 22:00 HRS
APIWL: 0.0
Displace well w/seawater. Test tubing to 3000 psi, annulus
to 3000 psi. Freeze protect well with diesel. Install BPV.
PJSM. ND BOPE, NU tree and test to 5000 psi, OK. Rig
released from 1R-01A ~ 2200 hrs.
ARCO Alaska, Inc. KUPARUK RIVER UNIT
,~, WELL SERVICE REPORT
'~' K1(1R-01A(W4-6))
WELL JOB SCOPE JOB NU'MBER "
1 R-01A PERFORATIONS-CT. 0207001829.7
DATE DAILY WORK UNIT NUMBER
02/17/00 COMPLETE PERFORATIONS AND SWAP TO DIESEL UNIT #6
DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR
2 YESI YES DS-JON ES KRALICK
FIELD AFC# CC# Signed
ESTIMATE AK0037 230DS10RO
InitialTbgPress FinalTbgPress Initial lnner Ann Final lnner Ann IlnitialOuterAnn I Final Outer Ann
0 PSI 150 PSI 0 PSI 0 PSIII0 PSI 0 PSI
DALLY SUMMARY
IPERFORATE: 8588' - 8665' W/2 1/2" HSD PJ 2506 4 SPF, SWAP HOLE TO DIESEL FROM 11.6# BRINE FROM 8400' TO
' SURFACE - INSTALL BACKPRESSURE VALVE RIG DOWN WORK PLATFORM AND COIL UNIT
TIME
19:00
LOG ENTRY
SAFETY MEETING W/1 VECO, 3 DS, 3 SWS, 1 APC. DISCUSS HANDLING OF GUNS (BREAK DOWN AND
MAKING UP), WELL CONTROL AND POSSIBILITY OF LIVE GUNS.
19:15 POH FROM 500', OBSERVING WHP, TAG UP IN WELLHEAD, 0 PSI WHP
19:30 WHP 0 BREAK OFF OF WELLHEAD, OBSERVE STABLE FLUID LEVEL. PU DEPLOY PIPE SLIPS ON
DEPLOYMENT SUB, STAB TIW VALVE, PULL 2 JOINTS W/CRANE,CONFIRM FIRED GUNS.
20:15 STAB INJECTOR ON DECK, RAISE T-BAR, BREAK OUT RUN #4, MU RUN #5 TO PERFORATE INTERVAL 8588' -
8665' W. 2 1/2" HSD PJ 2506 4 SPF.
21:15 PU MU INJECTOR, PRESSURE TEST WEATHERFORD MHA TO 4000 PSI, OK. DISPLACE DIESEL FROM CT W/
11.6#/GAL BRINE
22:25 MU MHA TO GUN BHA, STAB ONTO WELLHEAD, RIH W/GUN RUN #5, TAKING BRINE RETURNS THRU CHOKE
TO TANK
23:55 RIH TO FLAG @ 8399', PU WEIGHT 14000#, CORRECT TO BOTTOM SHOT.
00:10 RIH TO 9680', PU TO POSITION GUNS 8588'- 8665', PUMP 2 BBL 11.6# BRINE, LOAD 5/8" ALUMINUM BALL,
PUMP 2 BBL BRINE, 31 BBLS DIESEL. 1.5 BPM, 2500 PSI CTP.
00:50 BALL ON SEAT, GUNS FIRE 3700 PSI CTP, GOOD SURFACE INDICATION, POH W/FINAL GUN RUN PUMPING
11.6 #/GAL BRINE DOWN BACKSIDE.
02:10 TAG UP IN WELLHEAD, OBSERVE WHP
02:40 WELL STABLE BREAK OFF INJECTOR, BREAK OUT AND LAY DOWN SWS GUN BHA.
ARCO Alaska, Inc. KUPARUK RIVER UNIT
WELL SERVICE REPORT
'~' K1(1R-01A(W4-6))
WELL JOB SCOPE JOB NU'MBER "
1 R-01A DRILLING SUPPORT-CAPITAL 1227990826.3
DATE DAILY WORK UNIT NUMBER
02/16/00 PERFORATE (NEW WELL) UNIT #6
DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR
6 NOI NO DS-CORLIS MENKE
FIELD AFC# CC# Signed
ESTIMATE AK0037 230DS10RG
Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann I Initial Outer Ann I Final Outer Ann
0 PSI 0 PSI 0 PSI 0 PSII 0 PSII 0 PSI
DAILY SUMMARY
IPERFORATE · 9490' - 9850' W/2 1/2" HSD PJ 2006 4 SPF, 9338' - 9390', 9403' - 9489' 2 1/2" HSD PJ 2506 4 SPF -- MEMORY LOG
FOR DEPTH CONTROL - PERFORATE: 9232' - 8868' (364')
TIME LOG ENTRY
19:00 CONTINUED FROM PREVIOUS WSR. RIH W/GUN RUN #2 TO PERFORATE INTERVAL 9490' - 9850' W/2 1/2"
HSD PJ 2006 4 SPF.
19:05 TAKING RETURNS TO TANKS TRAPPING 150 PSI WHP.
20:00 RIH PAST @ 9292', POH WEIGHT CHECK - 17000#, CORRECT TO BOTTOM SHOT OF BHA. CONTINUE RIH
20:10 RIH TO 9875', PU TO POSITION BOTTOM SHOT @ 9850'. TRAP 200 PSI WHP AS DISPLACE COIL. PUMP 3 BBLS
10.2# FLO-PRO (LAST OF FP), 2 BBLS 11.6 # BRINE, DROP 5/8" BALL.,2 BBLS 11.6# BRINE AND 31 BBLS
DIESEL. 1.5 BPM, 2800 PSI.
20:45 BALL ON SEAT W/31 BBLS AWAY, 2500 PSI, SEE INDICATION OF SHOTS, REEL MOVEMENT. POH TO 9400',
PUMPING 11.6 #/GAL DOWN BACKSIDE,.5 BPM 1000 PSI
21:00 BULL HEAD 15 BBL BRINE DOWN BACKSIDE 1.8 BPM, 2200 PSI. POH PUMPING 11.6 #/GAL BRINE, .5 BPM, 800
PSI, TO KEEP HOLE FULL, 30 BBLS
22:00 TAG UP IN WELLHEAD. OBSERVE WHP. BLEED TO 0 PSI, OPEN TO RETURN TANK, FLOW SLOW TO STEADY
TRICKLE, CLOSE CHOKE, OPEN WHITEY ON LUBRICATOR AND MONITOR.
22:20 WELL APPEARS TO BE STABLE. PUMP BRINE DOWN KILL LINE, .2 BBLS GET RETURNS.
TIME LOG ENTRY
22:40 POP INJECTOR/LUB FROM WELLHEAD, OBSERVE FLUID LEVEL 5' DOWN AND STABLE. BREAK OF CT AND
MHA. ATTEMPT TO PUMP DIESEL TO FP CT W/DIESEL. CTC LEAKING. POSSIBILITY OF GUNS HAVING NOT
FIRED.
22:50 TAKE CT TO BACK DECK W/TEST PLATE ON IT, PUMP DIESEL TO FINISH FREEZE PROTECT CT. HOLE FLUID
LEVEL REMAINING STABLE. BREAK OUT DEPLOYMENT SUB, BLANK SUB, CONFIRM SHOTS FIRED, BALL
RECOVERED.
23:30 CONTINUE BREAKING OUT AND LAYING DOWN GUNS.
00:05 BHA OOH. PU INJECTOR BACK OVER RIG FLOOR, CUT OFF WEATHERFORD CTC AND MHA.
00:40 MU NEW CTC, PULL TEST TO 20K, OK, MU TO WELLHEAD, DISPLACE 30 BBL DIESEL FROM CT W/11.6#
BRINE.
01:00 START TO MAKE UP GUN RUN #3. 2 1/2" HSD PJ, 2506 4 SPF. FOR INTERVAL 9338' - 9390', 9403' - 9489'. SWS
OAL - 194.12'
02:00 LOWER T BAR, PU INJECTOR UP OVER RIG FLOOR. MU NR SWIVEL, PRESSURE TEST TO 4000 PSI, OK. MU
TO DEPLOYMENT SUB, STAB INJECTOR, OPEN CHOKE TO TAKE BRINE RETURNS AS RIH.
02:45 RIH W/BHA FOR PERF RUN #3. TRAP 200 PSI WHP AT CHOKE AS RIH.
04:10 AT FLAG, CORRECT TO LOP AND BHA TO BOTTOM SHOT, SHORT TRIP AND POSITION BOTTOM SHOT @
9489'. PU WT 17000#.
04:15 PUMP 2 BBL 11.6#/GAL BRINE, LOAD 5/8" ALUMINUM BALL, PUMP 2 BBL BRINE AND DISPLACE W/31 BBLS
DIESEL, 1.5 BPM, 2700 PSI CTP, TRAPPING 200 PSI WHP.
04:45 BALL FIRED @ 3900 PSI CTP. POSITIVE INDICATION OF GUNS FIRING. POH, PUMP 11.6 # BRINE DOWN
BACKSIDE AS POH.
06:15 TAG UP AT SURFACE, OBSERVE WHP - PULL SPENT GUNS - ALL SHOTS FIRED
07:00 MU MEMORY TOOLS 13.1' INCLUDING CCL AND GAMMA (11.8' TO CCL) - 3.19' OF MHA - RIH TAKING BRINE
RETURNS TO TIGER TANK
09:30 BEGIN LOGGING DOWN @ 60 FPM FROM 8400'- SAT DOWN IN PERF DEBRIS @ 10188' CTM - LOG UP FROM
10188' CTM TO 8400' CTM - POOH PUMPING .5 BPM 11.6 BRINE TO REFILL THE HOLE
11:40 OOH W/MEMORY RUN - TGSM ON RIG FLOOR - WELL IS DEAD - REMOVE TOOLS AND CHECK LOGS - GOOD
DATA
12:15 SET INJ. DOWN ON DECKAND MAKE UP GUNS FOR RUN #4-
13:50
15:00
17:00
17:30
P/T MHA TO 4000 PSI - DISPLACE COIL W/11.6 BRINE
RIH W/410.3' GUNS AND MHA FOR RUN #4 @ 8868'- 9232'- CORRECTED-I' @ FLAG DEPTH OF 8400'
DROP .625" BALL - 5 BBLS BRINE AND SWITCH TO DIESEL FOR FREEZE PROTECT ON COIL - 2500 PSI 1.3 BPM
BALL ON SEAT AND PRESSURE UP TO 3600 PSI WITH STEEP DROPOFF BUT NO OTHER INDICATION OF
FIRING- PUMP UP TO 4260 PSI WITH 1.9 BPM RATE TO CHECK- POOH WHILE FILLING HOLE FROM
BACKSIDE .5 BPM 11.6 BRINE @ 150 FT/MIN
ARCO Alaska, Inc. KUPARUK RIVER UNIT
WELL SERVICE REPORT
'~' K1(1R-01A(W4-6))
WELL JOB SCOPE JOB NU'MBER ' "
1R-01A PERFORATIONS-CT. 0207001829.7
DATE DAILY WORK UNIT NUMBER
02/14/00 CT MEM LOG / PERFORATE UNIT #6
DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR
1 NOI YES DS-BIGGERSTAFF KRALICK
FIELD AFC# CC# Signed
ESTI MATE AK0037 230 DS 10 RO
Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann I Initial Outer Ann I Final Outer Ann
0 PSI 0 PSi 0 PSI 0 PSII 0 PSII 0 PSI
DAILY SUMMARY
REBUILD AND TEST BOP'S, RUN MEMORY LOG (CCL AND GAMMA) - FLAG PIPE @ 9300'[Perf]
TIME LOG ENTRY
19:00 MOVING WORK PLATFORM FROM PRUDHOE BAY TO 1R-01 .INFORMATION ON PREVIOUS WSR
19:05 SPOT CT #6 W/14500' OF 1.75 X .109", 33K RF, 32 BBL VOL. WORK TO SHIM AND LEVEL UNIT W/
OUTRIGGERS, RAISE MAST, AND POSTITION UNIT CORRECTLY TO WORK PLATFORM.
21:00 SAFETY MEETING W/1 APC, 1 VECO, 2 WEATHERFORD, 3 DS, 1 ARCO. START TO RIG UP HYDRAULIC
HOSES TO BOP'S
23:00 CONTINUE TO HOOK UP BOP'S AND TROUBLESHOOT HYDRAULIC LINES/HOSES, CONNECTIONS ETC.
PROBLEMS WITH THE ANNULAR BAG. LINES WERE HOOKED UP BACKWARDS, CLOSED BAG W/NO PIPE IN
THEM.
23:30 TROUBLESHOOT ANNULAR PREVENTER. SWITCH HOSES ETC. BAG MALFUNCTIONING. GET TIOGA TRUNKS
AND PUT ON PREVENTER.
00:30 BAG STILL DYSFUNCTIONAL, PICK UP INJECTOR TO POSITION OVER WELL. CONTINUE TROUBLESHOOT
BOP'S. VALVE CREW ARRIVE AND SERVICE TREE.
01:45 DETERMINE HOSES LABELED NUMBER 1/2 SHOULD BE 7/8. CONSEQUENTLY, HOSES WERE MISLABELED,
CONTROL VALVES SWAPPED AROUND. WORK TO REMEDY THE SITUATION.
02:00 HYDRAULIC LINE PROBLEMS IDENTIFIED. FUNCTON TEST BOP, BLIND SHEAR, PIPE SLIPS. OK, RIG UP TO
PRESSURE TEST STACK.
02:30 PROBLEMS WITH PUMP CONTROLS IN OPERATIONS CAB FOR TRACTOR. TROUBLESHOOT
03:00 GET TRACTOR CONTROLS, DS CREW CHANGEOUT. SAFETY MEETING W/NEW CREWS
TIME
03:30
03:45
03:50
LOG ENTRY
FLUID PACK HL, BOP'S, LUB ETC. WITH DIESEL.LEAKING BLOCK VALVE ON KILL LINE. SWITCH TO PUMPING
SEAWATER TO WARM UP KILL LINE. PRESSURE TEST TO 4000 PSI, OK. RE- FREEZE PROTECT W/DIESEL.
TEST ALL OF ABOVE TO 2000 PSI TO TANKS, CLOSE CHOKE, BLEED OFF DOWNSTREAM TO THE TANKS,
TEST TO CLOSED CHOKE TO 4000 PSI, OK,
BEGIN BOP TEST.CLOSE PIPE/SLIP RAMS, PUSH-PULL TEST, LOW AND HIGH PRESSURE TEST OK. CLOSE
BAG, TEST TO 2500 PSI BELOW, OK, PU AND CLOSE BLIN/SHEARS. TEST FROM BELOW THRU KILL LINE AND
BLIND/SHEARS LEAKING. BLEED OFF AND CYCLE RAMS. RE-TEST, NOT HOLDING
04:45 ALL BOP TEST OK BUT BLIND SHEAR. GETTING PARTS TO RE-BUILD. WILL MAKE LOGGING RUN AND RE-
BUILD BETWEEN RUNS. BLEED OFF LUB ETC, BREAK OFF OF WELLHEAD.
05:00
05:30
05:50
06:00
06:10
07:20
07:30
07:45
08:03
08:30
08:40
08:55
09:13
09:17
09:38
09:44
10:30
11:30
14:45
15:00
18:59
START TO MAKE UP WEATHERFORD CTC AND MHA. PULL TEST CTC TO 15K. OK, PRESSURE TEST TO 3500
PSI, OK. MHA - 2.20" OD CTC, HYD DISCO (3/4" BALL) BLANK SUB (NO CIRC), 2.0" PORTED SUB. OAL - 3.19'
SAFETY MEETING W/SWS AND ALL OF CREW REGARDING MAKING UP LOGGING TOOL, HANDLING ETC.
START TO MAKE UP SWS MEMORY GR/CCL. OAL- 13.1'
TOTAL BHA OAL = 16.29'
MU TO WELLHEAD, ZERO TAGGED UP ON STUFFING BOX. OPEN MASTER VLV 17 1/2 TURNS TO CLOSED
CHOKE, O PSI WHP, RIH W/MEMORY LOGGING TOOLS.
RIH AT 120 FPM @ 6000', NOT PUMPING
AT 7000' WT CHECK 12000#.
UP WT AT 8600'. PUH TO 8450' TO LOG DOWN AT 60 FPM.
START BRINE DOWN COIL AT 1.0 BPM, RIH AT 9400', MAINTAIN 100 PSI ON WH.
TAG BTM AT APROX 10720 CTM RIH WHILE PUMPING, GOT WT BACK AT 10713.5. STOP AT 10690' TO CIRC
BTMS UP.
GRADUALLY PINCHED WELL BACK TO 900 PSI WHP. BRINE AT NOZZLE.
INCREASE PUMP RATE TO 1.5 BPM. OPEN CHOKE TO 800 PSI UPSTM.
SWITCH TO 6 BBL FLOPRO PILL WITH 40 OF 61 BBL BRINE UP ANN. 73 BRINE AWAY.
SWITCH BACK TO BRINE. 79 AWAY, STILL AT 10690'.
GOOD BRINE AT SURF, SWITCH TO FRAC TANK FOR BRINE RECYCLE. DROP RATE TO 0.5 BPM.
PUH AT 60 FPM TO 8450' WITH .5 BBL FLOPRO ABOVE US, LAYING IN FLOPRO AND PUMPING .5 BPM.
6.3 BBLS 10.1# FLOWPRO (3.3 #/BBL POLYMER - 125,000 ViS) LAYED ACROSS 10690'-9965' - LOGGED UP TO
9300' CTM AND FLAGGED PIPE - CONTINUED TO POOH LOGGING 60 FT/MIN TO 8450' CTM - POOH @ 80%
PUMPING 10.14 NACL
SWITCH TO DIESEL TO DISPLACE COIL AND SURFACE LINES - BREAK DOWN BOPS TO REBUILD BLIND
SHEARS
TEST BOP STACK AFTER REBUILD TO 4000 PSI - BOP'S GOOD
TGSM- PERF GUN SAFETY- LOAD GUNS AND EQUIP ON RIG FLOOR- OUT OF FUEL IN THE WORK
PLATFORM - SHUT DOWN @ 1700 WAITING ON FUEL
END OF REPORT- JOB LOG TO BE CONTINUED
ARCO Alaska. Inc. KUPARUK RIVER UNIT
,, WELL SERVICE REPORT
K1(1R-01A(W4-6))
WELL JOB SCOPE JOB NU'MBER
1 R-01A DRILLING SUPPORT-CAPITAL 1227990826.3
DATE DAILY WORK UNIT NUMBER
02/15/00 PERFORATING UNIT #6
DAY OPERATION COMPLETE SUCCESSFUL KEY PERSON SUPERVISOR
5 NO NO DS-CORLIS MENKE
FIELD AFC# CC# Signed
ESTIMATE AK0037 230DS10RG
Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann I Initial Outer Ann I Final Outer Ann
0 PSI 0 PSI 0 PSi 0 PSII 0 PSII 0 PSI
DAILY SUMMARY
PERFORATE 10011'- 10350', 2 1/2" HSD UJ 4 SPF - KILLED WELL W/260 BBL 11.6# BRINE - LOADED RUN #2 (9850' - 9489')
TIME LOG ENTRY
19:00 DS CT UNIT #6 RIGGED UP TO WORK PLATFORM. CONTINUE MAKING UP SWS 2 1/2" HSD 31J US 4 SPF
GUNS.
19:40 FINISH MAKING UP SWS GUNS. MU NR JT ON MHA, PRESSURE TEST TO 3500 PSI, OK. PUMP 2 BBL METH
SPACER, DISPLACE DIESEL FROM CT TO RETURN TANK W/10.0# BRINE.
20:40 STAB CT MHA TO GUNS, MU TO WELLHEAD, RIH W/BHA PERF RUN #1. TOTAL OAL - 388.46', TAKING BRINE
RETURNS TO SEGREGATED TANK.
21:00 FREEZE PROTECT PUMP AND BACKSIDE LINE W/METH.
21:10 RIH W/GUN RUN #1.
22:00 WEIGHT CHECK @ 5000' - 5800#
23:00
23:15
23:30
23:50
AT EOP FLAG (9292'), CORRECT TO BOTTOM SHOT (ADD 388.46'), CONTINUE RIH.
POSITION BOTTOM SHOT @ 9350', TOP SHOT @ 10011'. HOLD MEETING W/CREW DISCUSS PROCEDURE
FOR LOADING AND DISPLACING BALL TO FIRING HEAD, AND (FLUID PUMP ORDER ETC.)
PUMP 4 BBL FLO-PRO, 2 BBLS BRINE, LOAD BALL, DISPLACE W/2 BBL BRINE, (BRINE AND FLO-PRO 10.2
#/GAL), 31 BBLS HOT DIESEL @ 1.5 BPM, 3000 PSI CTP.
27 BBLS DISPLACEMENT AWAY, REDUCE RATE TO 1 BPM, 1800 PSI CTP, TRAPPING 50 PSI WHP
TIME
23:55
00:45
01:15
01:20
01:30
01:50
02:00
02:25
03:00
LOG ENTRY
31 BBLS AWAY, PRESSURE TO 3400, FIRE GUNS. OBSERVE WHP, APPEARS TO BE STABLE, POH KEEPING
HOLE FULL PUMPING BRINE DOWN CT BACKSIDE.
CT @ 4500', SHUT DOWN OBSERVE WELL, APPEARS TO BE STABLE, CONTINUE TO POH
TAG UP AT SURFACE, OPEN TO TANK AND OBSERVE FLUID LEVEL
FILL HOLE, TOOK .75 BPM TO GET HOLE FULL. ISOLATE AND OBSERVE
PRESSURE BUILD TO 100 PSI, OPEN CHOKE TO TANKS AND OBSERVE. GETTING A TRICKLE OF RETURNS
BREAK OFF INJECTOR AND LUBRICATOR. PU SET PIPE/SLIP RAMS. PUSH-PULL TEST SLIPS.
10 MINUTES GET 5 BBLS RETURNS BACK, WELL FLOWING .5 BPM. FLUSH CT W/DIESEL (ADDITIONAL 6
BBLS).
CLOSE CHOKE, PUMP 3,5 BBLS BRINE DOWN WELL. RUN OUT OF BRINE. VAC TRUCK 20 MINUTES OUT.
FREEZE PROTECT LINES, MONITOR WELLHEAD PRESSURE. 50 PSI.
WHP INCREASED TO 175 PSI, 10.2 #/GAL BRINE.BRINE ON LOCATION.
03:10 PUMP 5 BBL 10.3 #/GAL FLO-PRO, 87 BBLS OF 10.2 #/GAL BRINE, 2 BPM, 2400 PSI
04:10 92 BBLS AWAY, SHUT DOWN PUMPING AND OBSERVE WHP. BLEED TO 0 PSI, FLOWING TO TANK, SHUT IN.
04:40 RIG UP JUMPER LINE ACROSS TREE TO FREEZE PROTECT LINES W/DIESEL.
04:45 WHP STABLE @ 380 PSI.
05:00 CALL FOR 11.6 #/GAL BRINE. GETTING 12 # FROM MI TANK FARM AND CUTTING W/10.2 ON LOCATION.
07:00 MIXED 10.1 BRINE AND 12.0 BRINE TO MAKE AN 11.6# MIXTURE- VERIFIED WITH HYDROMETER
09:00 PUMP THREE BBL MEOH 2000 PSI @ 1.1 BPM DOWN BACKSIDE- SWITCH TO 11.6 BRINE @ 2.5 BPM 2500 PSI -
SWITCH TO 10.2# FLOPRO FOR 4 BBLS - SWITCH TO 11.6 BRINE FOR 85 BBLS 3.0 BPM @ 2450 PSI
10:00 ATTEMPT TO BLEED DOWN WELL - PRESSURE RISING ON SURFACE TO 220 PSI - PUMPING 135 BBLS 11.6#
BRINE TO ATTEMPT SECOND KILL PUMPING 3.8 BPM DOWN BACKSIDE @ 3000 PSI
11:43 WELL NOT BLEEDING DOWN PROPERLY - ATTEMPT TO TRICKLE TO TANK TO BLEED DOWN PRESSURE -
BLED ABOUT 1 BBL BACK- TUBING PRESSURED BACK TO 400 PSI
13:00 SHUTING IN SUPPORTING INJECTORS - - WAITING ON WELL TO DIE
15:30 WELL DEAD AND STABLE - START PULLING SPENT GUNS/FIRING HEAD AND DEPLOYMENT BAR, FILLING
HOLE EVERY 5 GUNS W/1 BBL TOTAL
16:05 OOH W/GUNS. ALL SHOTS FIRED. MAKE UP 2ND RUN, 360' OF SHOTS FROM 9850'-9489'
17:00 ALL GUNS MADE UP - CLOSE SLIPS/PIPES AND RIG OFF CRANE AND RIG UP INJECTOR HEAD
18:00 DISPLACE COIL VOLUME OF DIESEL TO TANKS USING 11.6 BRINE
18:59
RIH W/RUN # 2 (9850'-9489') - 360'
North Slope Alaska
Alaska State Plane 4
Kuparuk 1R
1R-OIA
Surveyed: 12 December, 1999
ORIGINAL
SURVEY REPORT
5 January, 2000
· ~ Your Ref: API-500292140401
Surface Coordinates: 5991050.09 N, 539829.76 E (70° 23' 11.3705" N, 149° 40' 33.8084". W)
Kelly Bushing: 79.90ft above Mean Sea Level
DRILLING SERVICES
RECEIVED
J~,~i'.! 0 6 200g
Alaska Oil & Gas Cons. Commi~
Survey Ref: svy8961
A itA~I~IilIJR'I'~I~ COt,~,~,Ab~'
Sperry-Sun Drilling Services
Survey Report for 1R-OIA
Your Ref: API-500292140401
Surveyed: 12 December, 1999
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
6397,90 43.800 105.630 5176.35 5256.25
6490.64 45.300 104.500 5242.44 5322.34
6518.44 44.480 103,000 5262.14 5342.04
6549.99 42.060 99.000 5285.11 5365.01
6642.90 37.380 88.000 5356.65 5436.55
6708.55 34.640 76.450 5409.81 5489.71
6740.66 33.210 65.640 5436.48 5516.38
6773.93 31.730 51.930 5464.58 5544.48
6807.28 30.580 45.080 5493.13 5573.03
6840.02 26.810 48.570 5521.85 5601.75
6870.09 23.490 59.500 5549.08 5628.98
6902.23 19,700 65.090 5578.96 5658.86
6932.60 15,810 67.920 5607.88 5687.78
6963.49 13.670 75.160 5637.75 5717.65
6996.74 13.540 87.610 5670.08 5749.98
7027.08 14.090 96.720 5699.54 5779.44
7059.33 15.010 112.020 5730.77 5810.67
7089.01 17,780 124.160 5759.25 5839.15
7124.53 19,970 133.440 5792.86 5872.76
7154.69 21.080 144.500 5821.12 5901.02
7187.16 23.260 143.500 5851.19 5931.09
7218.60 24.230 149.030 5879.97 5959.87
7251.49 26.070 154.220 5909.74 5989.64
7282.50 27.110 161.980 5937.48 6017.38
7315.58 27.180 167.720 5966.92 6046.82
Local Coordinates
Northings Eastings
(ft) (ft)
920.32 S 2699.91 E
937.22 S 2762.73 E
941.89 S 2781.79 E
946.03 S 2803.00 E
949.92 S 2862.03 E
944.84 S 2900.14 E
939.07 S 2917.04 E
929.91 S 2932.25 E
918.51 S 2945.16 E
907.74 S 2956.60 E
900.20 S 2966.86 E
894.66 S 2977.29 E
890.95 S 2985.77 E
888.44 S 2993.20 E
887.27 S 3000.89 E
887.55 S 3008.11 E
889.58 S 3015.88 E
893.56 S 3023.20 E
900.78 S 3032.09 E
908.74 S 3038.99 E
918.65 S 3046.19 E
929.17 S 3053.20 E
941.47 S 3059.82 E
954.33 S 3064.97 E
968.88 S 3068.91 E
Global Coordinates Dogleg
Northings Eastings Rate
(fi) (ft) (°/100fi)
Alaska State Plane 4
Kuparuk 1R
Vertical
Section
(ft)
5990144.16 N 542534.53 E 190.17
5990127.60 N 542597.45 E 1.829 190.24
5990123.03 N 542616.53 E 4.817 189.81
5990119.00 N 542637.76 E 11.588 188.32
5990115.43 N 542696.81 E 9.074 176.80
5990120.70 N 542734.89 E 11.137 162.04
5990126.57 N 542751.76 E 19.287 152.09
5990135.81 N 542766.92 E 22.524 139.30
5990147.28 N 542779.77 E 11.166 124.94
5990158.11 N 542791.15 E 12.597 111.58
5990165.70 N 542801.37 E 18.946 101.65
5990171.29 N 542811.78 E 13.405 93.60
5990175.05 N 542820.24 E 13,116 87.82
5990177.61 N 542827.65 E 9.128 83.46
5990178.82 N 542835.34 E 8.800 80.35
5990178.57 N 542842.55 E 7.387 78.75
5990176.59 N 542850.34 E 12.217 78.70
5990172.64 N 542857.68 E 14.799 80.65
5990165.47 N 542866.61 E 10.444 85.33
5990157.55 N 542873.54 E 13.353 91.23
5990147.68 N 542880.80 E 6.814 98.94
5990137.19 N 542887.87 E 7.722 107.29
5990124.93 N 542894.55 E 8.729 117.45
5990112.10 N 542899.77 E 11.684 128.54
5990097.56 N 542903.79 E 7.917 141.58
RECEIVED
06 2000
Comment
Tie-on Survey
Window Point
Continued...
5 January, 2000 - 15:54
-2-
~aOil&Gas Cons. Com~
Am~ho~
DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 1R-OIA
Your Ref: AP1-500292140401
Surveyed:. 12 December, 1999
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea Vertical Local Coordinates
Depth Depth Northings Eastings
(ft) (ft) (ft) (ft)
7346.71 26.880 170.730 5994.65 6074.55
7380.46 26.990 163.200 6024.75 6104.65
7413.76 26.870 162.870 6054.44 6134.34
7446.11 27.890 156.020 6083.17 6163.07
7476.26 28.980 149.780 6109.69 6189.59
7508,45 29,830 149,140 6137.73 6217.63
7540.50 30.760 154,330 6165.41 6245,31
7572.51 31.830 156,460 6192.77 6272.67
7606.74 31.950 159.740 6221.83 6301.73
7638.31 32.680 164.760 6248,52 6328.42
7675.05 34.040 169.140 6279.21 6359.11
7698.70 37.360 169.620 6298.41 6378.31
7730.66 40.500 175.560 6323,28 6403.18
7763.83 43.920 174.100 6347.84 6427.74
7793.66 47.270 180.890 6368.73 6448.63
7826.19 49.180 178.520 6390.40 6470.30
7859.89 52.160 183.510 6411.76 6491.66
7895.69 54.450 186.590 6433.16 6513.06
7923.46 58.560 182.150 6448.48 6528.38
7956.90 61.480 181.740 6465.19 6545.09
7989.19 63.750 181.180 6480.04 6559.94
8021.95 66.570 181.400 6493.80 6573.70
8049.74 71.090 177,200 6503.84 6583.74
8078.56 74.050 179.160 6512.47 6592.37
8111.42 77.640 178.520 6520.51 6600.41
982.78 S 3071.56 E
997.64 S 3075.00 E
1012.07 S 3079.40 E
1025.97 S 3084.63 E
1038.73 S 3091.18 E
1052.34 S 3099.21 E
1066.57 S 3106.85 E
1081.69 S 3113.77 E
1098.46 S 3120.51 E
1114.53 S 3125.64 E
1134.20 S 3130.19 E
1147.76 S 3132.73 E
1167.66 S 3135.28 E
1189.85 S 3137.30 E
1211.11 S 3138.19 E
1235.37 S 3138.32 E
1261.41 S 3137.84 E
1290.00 S 3135.30 E
1313.08 S 3133.56 E
1342.02 S 3132.58 E
1370.68 S 3131.85
1400.40 S 3131.18
1426.30 S 3131.51
1453.78 S 3132.38
1485.63 S 3133.02
Global Coordinates Dogleg
Northings Eastings Rate
(fi) (ft) (°/lOOft)
5990083.69 N 542906.51 E 4.498
5990068.84 N 542910.03 E 10.106
5990054.44 N 542914.51E 0.576
5990040.56 N 542919.81 E 10.230
5990027.84 N 542926.42 E 10.492
5990014.27 N 542934.53 E 2.815
5990000.08 N 542942.24 E 8.666
5989985.00 N 542949.24 E 4.808
5989968.26 N 542956.07 E 5.074
5989952.23 N 542961.29 E 8.807
5989932.58 N 542965.94 E 7.527
5989919,03 N 542968.56 E 14.088
5989899.15 N 542971.21 E 15.253
5989876.97 N 542973.35 E 10.726
5989855.71 N 542974.36 E 19.751
5989831.45 N 542974.62 E 7.999
5989805.41 N 542974.27 E 14.466
5989776.81 N 542971.89 E 9.407
5989753.72 N 542970.27 E 19.915
5989724.77 N 542969.44 E 8.796
E 5989696.11 N 542968.86 E 7.197
E 5989666.39 N 542968.35 E 8.630
E 5989640.49 N 542968.82 E 21.518
E 5989613.02 N 542969.84 E 12.148
E 5989581.17 N 542970.65 E 11.087
RECEIVED
, 0 6
5 January, 2000 - 15:54
Alaska State Plane 4
Kuparuk 1R
Vertical
Section
(ft)
Comment
154.31
167.78
180.57
192.65
203.28
214.35
226.12
238.93
253.39
267.57
285.40
297.84
316,40
337.31
357.62
381.02
406.30
434.57
457.31
485.52
513.40
542.27
567.20
593.52
624.12
Continued...
DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 1R-OIA
Your Ref: API.500292140401
Surveyed: 12 December, 1999
North Slope Alaska
Measured
Depth
(ft)
Incl.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
8145.27 81.810 179.120 6526.55 6606.45
8179.27 84.800 177.510 6530.51 6610.41
8209.78 84.620 178.290 6533.32 6613.22
8241.84 84.200 177.780 6536.44 6616.34
8280.43 80.570 175.640 6541.56 6621.46
8305.83 78.260 176.540 6546.22 6626.12
8337.79 75.950 175.990 6553.36 6633.26
8371.72 74.680 177.130 6561.96 6641.86
8404.00 74.700 176.240 6570.48 6650.38
8434.78 76.210 176.440 6578.21 6658.11
8467.82 78.630 177.020 6585.41 6665.31
8496.07 81.450 177.230 6590.29 6670.19
8528.51 83.090 179.580 6594.66 6674.56
8561.48 80.390 179.630 6599.39 6679.29
8593.19 78.290 181.040 6605.26 6685.16
8625.90 78.540 180.510 6611.83 6691.73
8658.58 79.040 181.670 6618.18 6698.08
8691.04 81.870 183.080 6623.56 6703.46
8722.66 84.660 187.000 6627.27 6707.17
8755.23 87.000 187.680 6629.64 6709.54
8788.52 89.010 190.460 6630.80 6710.70
8820.76 91.570 192.970 6630.64 6710.54
8854.45 94.100 194.890 6628.97 6708.87
8882.89 92.510 194.560 6627.33 6707.23
8912.01 90.590 194.710 6626.54 6706.44
1518.92 S 3133.71E
1552.67 S 3134.70 E
1583.03 S 3135.82 E
1614.92 S 3136.91 E
1653.09 S 3139.10 E
1678.00 S 3140.81 E
1709.09 S 3142.83 E
1741.85 S 3144.80 E
1772.93 S 3146.60 E
1802.66 S 3148.51E
1834.85 S 3150.34 E
1862.64 S 3151.74 E
1894.77 S 3152.63 E
1927.39 S 3152.86 E
1958.55 S 3152.68 E
1990.59 S 3152.24 E
2022.64 S 3151.63 E
2054.62 S 3150.31E
2085.89 S 3147.55 E
2118.11 S 3143.40 E
2150.96 S 3138.15 E
2182.52 S 3131.61E
2215.18 S 3123.51E
2242.64 S 3116.29 E
2270.80 S 3108.94 E
5989547.88 N 542971.51E
5989514.14 N 542972.69 E
5989483.79 N 542973.96 E
5989451.90 N 542975.23 E
5989413.74 N 542977.62 E
5989388.84 N 542979.46 E
5989357.76 N 542981.65 E
5989325.01 N 542983.80 E
5989293.94 N 542985.76 E
5989264.22 N 542987.82 E
5989232.04 N 542989.83 E
5989204.26 N 542991.38 E
5989172.14 N 542992.44 E
5989139.51N 542992.84 E
5989108.35 N 542992.82 E
5989076.31 N 542992.56 E
5989044.26 N 542992.12 E
5989012.27 N 542990.96 E
5988980.99 N 542988.37 E
5988948.75 N 542984.39 E
5988915.87 N 542979.32 E
5988884.28 N 542972.95 E
5988851.58 N 542965.02 E
5988824.08 N 542957.95 E
5988795.88 N 542950.75 E
RECEIVED
Dogleg
Rate
(°/lOOft)
12.442
9.972
2.613
2.055
10.894
9.739
7.420
4.957
2.660
4.946
7.522
10.009
8.780
8.191
7.934
1.762
3.803
9.714
15.146
7.480
10.301
11.120
9.423
5.709
6.613
Alaska State Plane 4
Kuparuk 1R
Vertical
Section
(ft)
Comment
656.10
688.44
717.48
748.00
784.31
807.93
837.43
868.56
898.12
926.35
956.96
983.44
1014.25
1045.70
1075.85
1106.91
1138.02
1169.26
1200.17
1232.37
1265.45
1297.63
1331.27
1359.66
1388.77
Continued...
5 January, 2000- 15:54
-4- ~ C~ a GI~ COils. Co~O~
DrillQueSt 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 1R-OIA
Your Ref: API-500292140401
Surveyed: 12 December, 1999
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates
Depth Northings Eastings
(fi) (ft) (ft)
8949.31 88.980 195.010 6626.68 6706.58
8977.40 88.510 193.770 6627.30 6707.20
9009,26 88.780 193.350 6628.05 6707.95
9040.14 88.980 192.300 6628.65 6708.55
9072.75 88.810 194.490 6629.28 6709.18
9104.34 87.350 192.730 6630.34 6710.24
9136.67 87.380 193.330 6631.83 6711.73
9168.63 87.290 194.420 6633.31 6713.21
9200.01 86.450 197.140 6635.03 6714.93
9231.94 86.340 195.990 6637.04 6716.94
9263.23 87.250 197.420 6638.79 6718.69
9294.99 89.510 195.260 6639.68 6719.58
9328.52 91.260 196.400 6639.46 6719.36
9358.79 91.790 195.310 6638.65 6718.55
9395.26 91.360 191.090 6637.65 6717.55
9424.84 91.230 191.710 6636.98 6716.88
9455.95 90.770 191.200 6636.44 6716.34
9486.45 89.480 193.300 6636.37 6716.27
9520.02 88.340 191.310 6637.01 6716.91
9551.67 88.550 191.490 6637.87 6717.77
9587.02 88.580 192.880 6638.75 6718.65
9617.13 89.320 194.540 6639.31 6719.21
9649.18 90.250 196.250 6639.43 6719.33
9681.81 90.550 196.450 6639.20 6719.10
9714.80 91.140 196.730 6638.71 6718.61
2306.85 S 3099.37 E
2334.05 S 3092.39 E
2365.02 S 3084.92 E
2395.12 S 3078.07 E
2426.83 S 3070.52 E
2457.52 S 3063.09 E
2488.98 S 3055.81 E
2519.97 S 3048.15 E
2550.12 S 3039.63 E
2580.67 S 3030.55 E
2610.59 S 3021.57 E
2641.05 S 3012.64 E
2673.31 S 3003.49 E
2702.41 S 2995.22 E
2737.90 S 2986.90 E
2766.89 S 2981.06 E
2797.37 S 2974.88 E
2827.18 S 2968.41 E
2859.97 S 2961.26 E
2890.98 S 2955.00 E
2925.52 S 2947.54 E
2954.77 S 2940.41 E
2985.67 S 2931.90 E
3016.98 S 2922.71 E
3048.59 S 2913.30 E
5 January, 2000- 15:54
-5-
Global Coordinates Dogleg
Northings Eastings Rate
(fi) (fi) (°/lOOff)
5988759.78 N 542941.37 E 4.391
5988732.54 N 542934.54 E 4.720
5988701.54 N 542927.24 E 1.567
5988671.40 N 542920.54 E 3.461
5988639.64 N 542913.16 E 6.735
5988608.92 N 542905.89 E 7.236
5988577.42 N 542898.78 E 1.856
5988546.38 N 542891.29 E 3.418
5988516.19 N 542882.93 E 9.059
5988485.60 N 542874.01 E 3.611
5988455.63 N 542865.19 E 5.411
5988425.12 N 542856.42 E 9.841
5988392.82 N 542847.45 E 6.229
5988363.67 N 542839.33 E 4.003
5988328.14 N 542831.20 E 11.627
5988299.12 N 542825.51E 2.141
5988268.60 N 542819.49 E 2.207
5988238.76 N 542813.18 E 8.080
5988205.93 N 542806.20 E 6.831
5988174.89 N 542800.12 E 0.874
5988140.31 N 542792.84 E 3.932
5988111.02 N 542785.86 E 6.035
5988080.08 N 542777.52 E 6.073
5988048.72 N 542768.50 E 1.105
5988017.06 N 542759.25 E 1.980
RECEIVED
Alaska State Plane 4
Kuparuk 1R
Vertical
Section
(ft)
Comment
1426.07
1454.15
1485.99
1516.84
1549.43
1580.99
1613.27
1645.19
1676.52
1708.37
1739.60
1771.33
1804.86
1835.11
1871.54
1901.05
1932.10
1962.56
1996.09
2027.66
2062.96
2093.05
2125.10
2157.72
2190.70
Continued...
DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 1R-OIA
Your Ref: AP1-500292140401
Surveyed: 12 December, 1999
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (fi) (ft) (fi) (ft)
9745.55 92.220 196.970 6637.81 6717.71
9781.23 92.090 196.460 6636.47 6716.37
9809.41 92.120 196.810 6635.43 6715.33
9841.14 94.010 197.300 6633.74 6713.64
9872.44 94.650 198.070 6631.37 6711.27
9904.82 93.080 196,740 6629.19 6709.09
9938.26 92.220 196.340 6627.65 6707.55
9970.78 94.190 195.630 6625.83 6705.73
10002.97 93.980 194.870 6623.53 6703.43
10036.86 93.170 194.550 6621.42 6701.32
10064.21 92.220 193.560 6620.13 6700.03
10096.53 90.860 194.090 6619.27 6699.17
10129.31 91.310 193.420 6618.65 6698.55
10160.96 91.360 195.240 6617.91 6697.81
10225.60 89.570 194.800 6617.38 6697.28
10257.01 89.910 193,800 6617.53 6697.43
10289.06 90.060 192.770 6617.53 6697.43
10322,05 89.820 192.060 6617.57 6697.47
10353.64 89.130 192.270 6617.86 6697.76
10384.43 89.200 193.600 6618.31 6698.21
10417.95 88.890 192.960 6618.87 6698.77
10449.71 88.800 192.680 6619.51 6699.41
10480.17 87.570 193.840 6620.47 6700.37
10513.39 87.320 193.950 6621.95 6701.85
10546.38 86.860 194.400 6623.63 6703.53
3078.01 S 2904.39 E
3112.16 S 2894.13 E
3139.14 S 2886.07 E
3169.43 $ 2876.78 E
3199.16 S 2867.30 E
3229.99 S ' 2857.63 E
3262.01S 2848.13 E
3293.22 S 2839.18 E
3324.20 S 2830.74 E
3356.91 S 2822.15 E
3383.42 S 2815.52 E
3414.79 S 2807.80 E
3446.62 S 2800.00 E
3477.28 S 2792.17 E
3539.70 S 2775.42 E
3570.14 S 2767.66 E
3601.33 S 2760.30 E
3633.55 S 2753.21 E
3664.43 S 2746.55 E
3694.43 S 2739.66 E
3727.05 S 2731.96 E
3758.01 S 2724.91 E
3787.65 S 2717.93 E
3819.86 S 2709.96 E
3851.81 S 2701.89 E
5987987.59 N 542750.50 E
5987953.39 N 542740.43 E
5987926.37 N 542732.51E
5987896.03 N, 542723,38 E
5987866.24 N 542714.05 E
5987835.37 N 542704,56 E
5987803,29 N 542695.22 E
5987772.04 N 542686.44 E
5987741.01N 542678.16 E
5987708.25 N 542669.75 E
5987681,72 N 542663.25 E
5987650.31 N 542655.70 E
5987618.43 N 542648.08 E
5987587.73 N 542640.41 E
5987525.22 N 542623.99 E
5987494.74 N 542616.40 E
5987463.51 N 542609.20 E
5987431.25 N 542602.28 E
5987400,34 N 542595.79 E
5987370.30 N 542589.05 E
5987337.64 N 542581.53 E
5987306.64 N 542574.65 E
5987276.97 N 542567,82 E
5987244.71 N 542560.03 E
5987212.73 N 542552.13 E
RECEIVED
2000
Dogleg
Rate
(°/100ft)
3.598
1.474
1,246
6.153
3.193
6.348
2,836
6.438
2.444
2.569
5.014
4.516
2.462
5.751
2.852
3,363
3.248
2.272
2.283
4.325
2.121
0.926
5.549
0.822
1.949
Alaska State Plane 4
Kuparuk 1R
Vertical
Section
(ft)
Comment
2221.42
2257.05
2285.20
2316.87
2348.04
2380.32
2413.71
2446.17
2478.28
2512.10
2539.42
2571.72
26O4.49
2636.12
2700,76
2732.17
2764.20
2797.16
2828.71
2859.47
2892.97
2924.70
2955.13
2988.31
3021.26
Continued...
5 Januar~ 2000-15:54
-6-
,qadaOil & Gas Cons. Commimion
- q~hnr ~
DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 1R-OIA
Your Ref: API-500292140401
Surveyed: 12 December, 1999
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (it)
10577.19 87,230 194.830 6625.21 6705.11
10610.92 87,260 194.480 6626.84 6706.74
10642.80 88,620 195.280 6627.98 6707.88
10672.94 89,050 195,670 6628.59 6708.49
10708.14 89.660 195.440 6628.99 6708.89
10739.38 91.350 195.510 6628.72 6708.62
10769.18 93.200 195.110 6627.53 6707.43
10802.70 93.720 195.370 6625.51 6705.41
10834.64 94.000 195.610 6623.36 6703.26
10864.04 94.150 195.810 6621.27 6701.17
10898.47 94.470 196,190 6618.68 6698.58
10930.62 94.590 195.830 6616.14 6696.04
10960.84 94.900 195.480 6613.64 6693.54
10994.87 95,430 195.860 6610.58 6690.48
11026.70 96.410 196.220 6607.30 6687.20
11053.09 96,970 196,400 6604.22 6684~2
11083.04 97.310 196.150 6600.50 6680.40
11117.30 97.810 196,590 6595.99 6675.89
11148.16 97.910 196.180 6591.77 6671.67
11186.91 98.060 196.910 6586.39 6666.29
11214.67 96.450 198.170 6582.88 6662.78
11249.15 94.460 199.070 6579.61 6659.51
11277.52 94.560 199.470 6577.38 6657.28
11316.27 94,680 199.230 6574.25 6654,15
11346.16 94,130 199.910 6571.96 6651.86
3881.58 S 2694.13 E
3914.17 S 2685.61E
3944.96 S 2677.42 E
3974.01 S 2669.38 E
4007.91S 2659.94 E
4038.02 S 2651.61 E
4066.74 S 2643.75 E
4099.02 S 2634.95 E
4129.73 S 2626.44 E
4157.96 S 2618.50 E
4190.96 S 2609.04 E
4221.77 S 2600.20 E
4250.77 S 2592.07 E
4283.40 S 2582.92 E
4313.83 S 2574.17 E
4338.98 S 2566.81E
4367.51 S 2558.48 E
4400.10 S 2548.91E
4429.42 S 2540.29 E
4466.21S 2529.36 E
4492,46 S 2521.06 E
4524.99 S 2510.10 E
4551.69 S 2500.77 E
4588.13 S 2487.97 E
4616.21S 2477.99 E
Global Coordinates Dogleg
Northings Eastings Rate
(fi) (ft) (°/100ft)
5987182.91N 542544.52 E
5987150.27 N 542536.17 E
5987119.44 N 542528,16 E
5987090.36 N 542520.27 E
5987056.40 N 542511.01E
5987026.25 N 542502.84 E
5986997.49 N 542495.13 E
5986965.16 N 542486.51E
5986934.41N 542478.16 E
5986906.13 N 542470.37 E
5986873.08 N 542461.08 E
5986842.23 N 542452.41 E
5986813.19 N 542444.43 E
5986780.51 N 542435.45 E
5986750.03 N 542426.87 E
5986724.84 N 542419.64 E
5986696.27 N 542411.47 E
5986663.63 N 542402.07 E
5986634.26 N 542393.60 E
5986597.42 N 542382.87 E
5986571.12 N 542374.71 E
5986538.53 N 542363.92 E
5986511.79 N 542354.73 E
5986475.28 N 542342.13 E
5986447.14 N 542332.30 E
RECEIVED
1.840
1.040
4.948
1.926
1.852
5.414
6.351
1.734
1.153
0.849
1.441
1.177
1.544
1.914
3.278
2.228
1.405
1.937
1.355
1,905
7.342
6.329
1.449
0.691
2.921
Alaska State Plane 4
Kuparuk 1R
Vertical
Section
(ft)
Comment
3052.03
3085.72
3117.57
3147.71
3182.90
3214.14
3243.91
3277.37
3309.24
3338.56
3372.89
3404.93
3435.05
3468.94
3500.59
3526.80
3556.51
3590,46
3621.02
3659.38
3686.89
3721.14
3749.35
3787.86
3817.57
Contmued...
DrillQuest 1.05.04e
5 January, 2000- 15:54 - 7-
Sperry-Sun Drilling Services
Survey Report for 1R-OIA
Your Ref: API-500292140401
Surveyed: 12 December, 1999
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
11382.69 93.480 200.200 6569.53 6649.43
11414.11 92.430 200.260 6567.91 6647.81
11445.96 92.090 199.950 6566.66 6646.56
11477.95 90.090 200.630 6566.05 6645.95
11508.63 88,920 200.590 6566.32 6646.22
11543.77 86.490 200.240 6567.72 6647.62
11571.86 84.510 201.010 6569.93 6649.83
11604.51 82.630 201.340 6573.58 6653.48
11636.40 84.300 201.520 6577.21 6657.11
11668.02 86.400 201.620 6579.77 6659.67
11701.22 86.890 201,420 6581.72 6661.62
11735.59 86.960 200,910 6583.56 6663,46
11766.45 87.170 200.650 6585.14 6665,04
11800.37 87.350 200.730 6586.76 6666,66
11833.42 87.820 200.920 6588.16 6668,06
11858.00 88.490 201.290 6588.95 6668.85
11891.61 89.260 200.790 6589.61 6669.51
11914.58 89.350 200.560 6589.89 6669.79
11955.09 89.450 200.080 6590.31 6670.21
11988.31 87.480 198.880 6591.20 6671.10
12019.89 87.410 198.710 6592.61 6672.51
12051,12 87.970 198.460 6593.87 6673.77
12084,61 88.250 198.810 6594.97 6674.87
12108,59 88.430 198.850 6595.67 6675.57
12171.00 88,430 198.850 6597.38 6677.28
4650.45 S 2465.49 E
4679.89 S 2454.64 E
4709.78 S 2443.70 E
4739.77 S 2432.61 E
4768.49 S 2421.81E
4801.39 S 2409.56 £
4827.60 S 2399.70 E
4857.85 S 2387.98 E
4887.34 S 2376.40 E
4916.65 S 2364.82 E
4947.48 S 2352.66 E
4979.49 S 2340.27 E
5008.30 S 2329.33 E
5040.00 S 2317.36 E
5070.86 S 2305.62 E
5093.78 S 2296.78 E
5125.15 S 2284.71E
5146.63 S 2276.61 E
5184.62 S 2262.54 E
5215.93 S 2251.46 E
5245.79 S 2241.30 E
5275.37 S 2231.36 E
5307.09 S 2220.66 E
5329.77 S 2212.92 E
5388.81 S 2192.77 E
Global Coordinates Dogleg
Northings Eastings Rate
(ft) (ft) (°/lOOft)
5986412,84 N 542319.98 E 1.948
5986383.34 N 542309.29 E 3.347
5986353.39 N 542298.51 E 1.444
5986323.34 N 542287.58 E 6.603
5986294.57 N 542276.93 E 3.816
5986261.60 N 542264.86 E 6.986
5986235.34 N 542255.13 E 7.560
5986205.02 N 542243.58 E 5.845
5986175.47 N 542232.16 E 5.267
5986146.10 N 542220.73 E 6.649
5986115.21N 542208.74 E 1.594
5986083,14 N 542196.52 E 1.496
5986054,26 N 542185.73 E 1,082
5986022.50 N 542173.93 E 0,581
5985991.58 N 542162.36 E 1,534
5985968.61N 542153,63 E 3.113
5985937.19 N 542141,74 E 2.731
5985915.65 N 542133.74 E 1.075
5985877.59 N 542119.88 E 1.210
5985846.23 N 542108.97 E 6.943
5985816.31 N 542098.97 E 0.582
5985786.68 N 542089.18 E 1.963
5985754.91 N 542078.65 E 1.338
5985732.18 N 542071.04 E 0.769
'"" 0 6 ?.000
Oll&G C s.C,m mion
Alaska State Plane 4
Kuparuk 1R
Vertical
Section
(ft)
Comment
3853.87
3885.12
3916.82
3948.67
3979.20
4014.15
4042.02
4074.27
4105.75
4137.06
4169,99
4204,11
4234.77
4268.49
4301.34
4325.77
4359.18
4382.04
4422.37
4455.48
4486.96
4518.10
4551.50
4575.42
4637.67
Projected Survey
Continued...
DrillQuest 1.05. 04e
5 January, 2000-15:54 -8-
Sperry-Sun Drilling Services
Survey Report for 1R-OIA
Your Ref: API-500292140401
Surveyed: 12 December, 1999
North Slope Alaska
Alaska State Plane 4
Kuparuk 1R
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Wellhead. Northings and Eastings are relative to Wellhead.
Magnetic Declination at Surface is 26.735° (26-Nov-99)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Wellhead and calculated along an Azimuth of 195.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12171.00ft.,
The Bottom Hole Displacement is 5817.86ft., in the Direction of 157.858° (True).
Comments
Measured Stati o n ' Coord i nates
Depth TVD Northings Eastings Comment
(ft) (ft) (ft) (ft) ~
6397.90 5256.25 920.32 S 2699.91 E Tie-on Survey
6490.64 5322.34 937.22 S 2762.73 E Window Point
12171.00 6677.28 5388.81 S 2192.77 E Projected Survey
5 January, 2000 - 15:54 - 9 - DrillQuest 1.05.04e
2~29~00
Iqq.oqc/
Schlumberger
NO. 121231
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Kuparuk
Color
Well Job # Log Description Date BL Sepia Print
1 R-01A 20076 SC MT 2/6/00 1
1 R-22A 20075 SCMT 2/5/00 1
3F-20 20086 SCMT 2/13/00 I
....
t MAR 1 4 2000
SIGNED: DATE:
' Alaska Oil & Gas Co:~s. co[mimi$$ior~
Anchorage
Please sign and return one this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
WELL LOG TRANSMYrTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Loft T~lor
3001 Porcupine Dr.
Anchor~e, Alaska 99501
February 15, 2000
MWD Formation Evaluation Logs 1R-01& AK-MM-90198
The technical data listed below is being submitted herewitk Please address any problems or concems
to the attention of.'
Jim Gal~ Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518
!R-O1A:
2" x 5" MD ResistM~, & Craw-ma Ray, Logs:
50-029-21404-01
2"x 5" TVD Resistiviw & Gamma Ray Logs:
50-029-21404-01
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
·
RECE'IVED
FEB i6 000
.Alaska Oil & Gas Cons, Commission
Anchorage
5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax' 907-273-3535
A Halliburton Company
Schlumberger
NO. 121137
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Kuparuk
Color
Well Job # Log Description Date BL Sepia Print
1 L-26 20054 SCMT 000118 1
2N-345 20053 SCMT 000117 1
1R-01A JEWELRY LOG W/PSP & SCMT 000108 I 1
2M-18 ~,k\ (- LEAK DETECTION LOG 000105 I 1
1D-111 LI.~ C. INJECTION PROFILE W/PSP 000104 1 1
1D-114 INJECTION PROFILE W/PSP 000104 1 1
1 D-122 INJECTION PROFILE 000106 I 1
1D-128 INJECTION PROFILE 000106 I 1
1 D-130 ,~ ~,' iNJECTION PROFILE 000107 I I
SIG DATE:
o Alask~ 0il & Ge~ Cons. Commission
_Anc~0rage
Please sign and return one opy of this transmit Sherrie at the above address or fax to (907) 561~317. ~nanK you.
1/27/00
Scblmberger
NO. 121121
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Kuparuk
Color
Well Job # Log Description Date BL Sepia Print CD
~'L-03A 20011 SCMT 991126 1
1 L-28 20009 SCMT 991219 1
1 R-01A 20013 SCMT 000108 1
2N-343 /~ I (_. 99350 !EST ~ C~ L~ C~ ~ 990827 1 1 1
~ .P. [ L ~ ! V i- 13
SIGN ED.~O'~~ DATE:
Please sign and return one ¢op¥ o! this transmittal to Sherrie at the above address or fax to {00'/) 551-8317. Thank you.
FEB 04 2OOO
Anchorage
1/25/00
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.' Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs
1R-01A,
January 13, 2000
AK-MM-90198
1 LDWG formatted Disc with verification listing.
API#: 50-029-21404-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING ANII RETURNING THE ATTACHED COPY
OF ~ TRANSMITTAL LETII~R TO THE ATr~CrlO~ Olr:~.
Sperry-Sun Drilling Service
Attn: Jim Galvin
5631 Silverado Way, Suite G.
Anchorage, Alaska 99518
RECEIVED
5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535
A Halliburton Company
05-Jan-00
AOGCC
Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Re: Distribution of Survey Data for Wel 1R-01A
Dear Lori Taylor:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
6,397.90' MD
6,490.64' MD
12,171.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
~'AN 06
/iladmOil & Gas Ceos. Com~
William T. Allen
Survey Manager
Attachment(s)
MEMORANDUM
TO: Robert Christenson
Chairman
State of Alaska
Alaska Oil and Gas Conservation Commission
,¢A~ DATE: December 15, 1999
THRU'
Blair Wondzell,
P. I. Supervisor
FROM' Chuck ScheveY"~~ SUBJECT:
Petroleum Inspector
BOPE Test
Nabors 16E
KRU 1R-01A
PTD # 198-237
Wednesday, December t5, 1999' I traveled to Arco's KRU 1R-01A well being
drilled by Nabors Rig 16E (previously Pool 6) and witnessed the weekly BOPE test.
As the attached AOGCC BOPE test report indicates, the test lasted 3.5 hours with
no failures.
The recent purchase of Pool Drilling by Nabors appears to have had no adverse
affect as the rig crews remained unchanged and seemed to be in good spirits. The
rig was clean and all related equipment appeared to be in good working order. The
location was well organized allowing good access to the rig.
Summary: I witnessed the weekly BOPE test on Nabors Rig 16E drilling Arco's
1R-01A Well.
Nabors 16, 12/15/99, Test time 3.5 hours, no failures
Attachment: BOP Nabors 16E 12-15-99 CS
X Unclassified
Confidential (Unclassified if doc. removed )
Confidential
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: X Workover: DATE:
Ddg Contractor: Nabors Rig No, 16E PTD # 198-237 Rig Ph.#
Operator: ARCO Rep,:
Well Name: 1 R-01A Rig Rep.:
Casing Size: Set ~ Location: Sec.
Test: Initial Weekly X Other
12/15/99
659/7562
Fred Herbert
Jimmy Greco
20 T. 12N R. 10E Meridian UM
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
PTD On Location YES
Standing Order Posted YES
Well Sign OK
Drl. Rig OK
Hazard Sec. OK.
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln, Valves
HCR Valves
Kill Line Valves
Check Valve
Quan.
1
Test Press. P/F
250/3500 ~
I 250/3500
1 250/3500
1 250/3500
1 250/3500
2 25~3500
1 250/3500
N/A
MUD SYSTEM: Visual Alarm
Trip Tank OK OK
Pit Level Indicators OK OK
Flow Indicator OK OK
Meth Gas Detector OK OK,
H2S Gas Detector OK OK '
FLOOR SAFETY VALVES:
Upper Kelly/IBOP
Lower Kelly/IBOP
Ball Type
Inside BOP
Test
Quan. Pressure P/F
1 250/3500 P
1 25O/35OO P
1 250/3500 p
1 250/3500 P
CHOKE MANIFOLD:
No. Valves 15
No. Flanges 30
Manual Chokes 1
Hydraulic Chokes 2
Test
Pressure P/F
25O/5OOO P
250/5000I P
Functioned P
Functoned P
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's:
29OO
1500
minutes 25 sec.
2 minutes 30 sec.
OK Remote: OK
6 @ 2OOO Psi
Psig.
Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested 23 Repair or Replacement of Failed
Equipment will be made within 0 days. Notify the Inspector and follow with Wdtten or Faxed verification to
theAOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c ~2~L
-Inspe or
STATE WITNESS REQUIRED?
YES X NO
YES
24 HOUR NOTICE GIVEN
X NO
Waived By:
Witnessed By: Chuck Scheve
16E 12-15-99 CS
MEMORANDUM
TO:
State of Alaska
Alaska Oil and Gas Conservation Commission
Robert Christenson,~.)~~? DATE' November 25, 1999
Chairman
THRU'
Blair Wondzell,
P. I. Supervisor
FROM' John Crisp,~r~. SUBJECT:
Petroleum Irfspector
FILE NO'
Rig Insp. Pool 6 jc. DOC
Gas Detector Calibrations
Kuparuk River Unit
Redrill 1R-0 lA
PTD 198-237
November 25,1999' I traveled to Pool 6 in the Kuparuk River Field for initial
BOPE test on 1R-01A.
This is the first Decompletion for Pool 6 in the Kuparuk River Field. The timing
for the BOPE test was uncertain @ the time of my arrival. A BPV was set in the
tbg. hanger that was seeping freeze protection diesel. The Drilling Foreman was
going to circulate out diesel & seawater & reinstall BPV before ND tree & NU
BOPEs. I conducted Rig inspection & witnessed calibration of H2S & methane
gas detectors. I waived witnessing BOP test.
SUMMARY: I conducted Rig inspection on Pool 6 in KRU & witnessed
calibration & testing of 3 methane & 4 H2S gas detectors KRU 1R-01A.
Attachments: None.
cc;
NON-CONFIDENTIAL
Rig inspection Pool 6?
Subject: Rig inspection Pool 6?
Date: Fri, 26 Nov 1999 08:38:42 -0900
From: John Crisp <john_crisp@admin. state.ak.us> Internal
Organization: State of Alaska, Dept ofAdmin, AOGCC
To: Blair E Wondzell <blair wondzell@admin.state.ak.us>
Morning Mr. Blair, Looks like Nabors finally took over Pools Rigs in
Alaska. The personell manager for Nabors came to 6 11-24 & told the
hands. The Toolpusher said his Rig would be Nabors 16e. I do not know if
this Rig change is official or how it will affect us. JC.
i Name: Rig inspection Pool 6 11-25-99jc.doc
~Rig inspection Pool 6 11-25-99jc.doci Type: Microsoft Word Document
!Encoding: base64
1 of 1 11/26/99 10:04 AM
TONY KNOWLE$, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Graham Alvord
Drilling Engineering Supervisor
ARCO Alaska, Inc.
P O Box 100360
Anchorage, AK 99510-0360
Re~
Kuparuk River Unit l R-01A
ARCO Alaska. Inc.
Permit No: 198-237
Sur Loc: 154'FNL, 139'FWL, SEC. 20, T12N. R10E. UM
Btmhole Loc. 137'FNL, 2313'FWL, SEC. 29. T12N. RIOE. UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to redrill thc above referenced xvell.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
bv contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sinc~e~ ~ /
Robert N. Chr' enson. P. E.
Chairman
BY ORDER OF TH_~OMMISSION
DATED this [ ~ ~ day of November, 1999.
dlf:Enclosures
cc: Department of Fish & Game. Habitat Section w:o encl.
Department of Environmental Conservation w/o encl.
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
October 28, 1999
Mr. Robert Christenson
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject: Permit to Drill for 1R-01A
-1999
Alaska Oil & Gas Cons. ComrrlJssion
Anchorage
Dear Mr. Commissioner:
ARCO Alaska, Inc., as operator of the Kuparuk Unit well, 1R-01A, submits the enclosed
Permit to Drill. This permit is intended to replace the permit application we submitted in
November 1998 for this well, approval # 98-237 and the Application for Sundry
Approval for abandonment of 1R-01, approval # 398-305.
If you have any questions regarding this matter, please contact me at 265-6120 or Bill
Lloyd at 265-6531.
Sincerely,
Graham C. Alvord
Drilling Engineering Supervisor
GCA/skad
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
October 27, 1999
Robert Christenson, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501-3192
Re:
Application for Permit to Drill: KRU :lR-Ola
Surface Location: :154' FNL :139' FWL Sec 20 T12N R10E, UM
Target Location: :1672' FNL, :1984' FEL Sec. 20, T:12N, R10E¢ UM
Bottom Hole Location: 137' FNL, 23:13' FWL Sec. 29¢ T12N~ R:1OE, UM
Dear Commissioner Christenson,
ARCO Alaska, :[nc. hereby applies for a Permit to Drill an onshore development
well to the Kuparuk interval from 1C pad in the Kuparuk River Unit ("KRU"). The
well is designed to penetrate and further develop the production potential of the
Kuparuk sands in the vicinity of 1R pad.
The well is designated as a horizontal sidetracked production well, exiting from the
existing 7" intermediate casing of the 1R-01 well. A 3-1/2" production liner will be
run and cemented and the well will be completed with 3-1/2" tubing.
Please find attached information as required by 20 AAC 25.005 (a) and (c) for
your review. Pertinent information attached to this application includes the
following:
1)
2)
3)
4)
Form 10-401 ApplicatiOn for Permit to Drill per 20 AAC 25.005 (a).
Fee of $100 payable to the State of Alaska per 20 AAC 25.005 (c) (1).
A directional plat showing the surface and bottomhole locations proposed
for the well per 20 AAC 25.005 (c) (2).
Directional plots and proximity calculations in accordance with the
requirements of 20 AAC 25.050.
C V
hi'
7)
8)
ARCO does not anticipate the presence of H2S in the formations to be
encountered in this well. However, H2S monitoring equipment will be
functioning on the rigs as is the standard operating procedure in the
Kuparuk River Unit drilling operation.
5) A complete proposed casing and cementing program is attached as
per 20 AAC 25.030. A wellbore schematic is also attached visually
depicting the proposed well and completion design.
6) The drilling fluid program, in addition to the requirements set forth i~,
20 ~C 25.033 are a~ached in this APD package.
A copy of the proposed drilling program.
Robert Christenson
Application for Permit to Drill - 1R-01 a
Page 2
9)
Due to the large volume of regional information available, ARCO
considers this well to be a development well, and as such, no
mudlogging operations such as type log generation and sample
catching are planned. The following are ARCO's designated contacts
for reporting responsibilities to the Commission:
1)
2)
Completion Report
Technologist
(20 AAC 25.070)
Geologic Data and Logs
(20 AAC 25.071)
Sharon AIIsup-Drake, Drilling
263-4612
Hark Longden, Geologist
263-4506
The anticipated spud date for this well is November 25, 1999. If you have any
questions or require further information, please contact Bill Lloyd at (907) 265-
6531 or Chip Alvord at (907) 265-6120.
William"B. _Lloyd, I I~
Senior Ddlh'ng Er~i~eer
CC:
Kuparuk :l.R-Ola Well File
Chip Alvord ATO-1030
Jim Burd ATO-1282
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2o 25.005
la. Type ofwork: Drill ~Redri,l F'~ lb. Z;pe ofwel,'. E)~ploratory D StratigraphicTest D Development Oil []
Re-entry FI Deepen FI Service FI Development Gas FI Single Zone r~ Multiple Zone E]
2. Name of Operator 5. Datum elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. RKB~g~) JZ~ feet
3. Address 6. Property Designation ,~_E~ ~'&,~"~ Kuparuk River Field
P.O. Box 100360 Anchorage, AK 99510-0360 :~¢t~ ADL 25640 ALK 2571 ,Z~) Kuparuk River Pool
4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.0251)
154' FNL, 139' FWL, Sec. 20, T12N, R10E, UM Kuparuk River Unit Statewide
At top of productive interval 8. Well number Number
1672' FNL, 1984' FEL, Sec. 20, T12N, R10E, UM 1R-01A #U-630610
At total depth 9. Approximate spud date Amount
137' FNL, 2313' FWL, Sec. 29, T12N, R10E, UM November 25, 1999 $200,000
12. Distance to nearest propert~ line (~ [ 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
<~'~,~-7~ ~ i feet/~ None feet 2459 12022'gD/6540 'IYD
18. To be completed for deviated wells 17. Anticipated pressure (see~.. G 25.035 (e)(2))
Kickoff depth: 6496 MD Maximum hole angle 94.7° Maximum surface $097 psi§ At total depth (TVD) 3674 psi§
t 8. Casing program Setting Depth
size Specifications Top Bottom Quantity of Cement
Hole Casin~ Weight Grade Couplin~l ken~th MD -I-VD MD IVD {include sta[le data/
6.125" 3.5" 9.3# L-80 BTC 5674' 6348' 5220' 12022' 6540' 990 sx Class G
sidetrack - top of window @ 6498'
19. To be completed for RedrJll, Re-entry, and Deepen Operations.
Present well condition summary
Total Depth: truemeasuredvertical 6898570 feet 1 feet Plugs(measured) ORIGINAL
Effective Depth: measured 8453 feet Junk (measured)
true vertical 6797 feet
Casing Length Size Cemented Measured depth True Medical depth
Conductor 115' 16" 250 sx CS 11 115' 115'
Surface 4380' 9.625" 1250 sx PF E III, 420 sx PFC 4380' 3867'
Production 8535' 7" 250 sx Class G & 200 sx PFC 8535' 6864'
Perforation depth: measured 8004'-8103', 8199'-8245', 8289'-8300' 00"l' 2 .¢;~ ]999
true vertical 6446'-6523', 6597'-6634', 6668'-6678'Alaska 0it & Gas Cons, 00mm, issi0ri
Anr:.hnr2n¢.
20. Attachments Filing fee [~] Property Plat E~ BOP Sketch [~] Diverter Sketch D Drilling program [~]
Drilling fluid program [~] Time vs depth plot FiReffaction analysis FI Seabed report FI 20 AAC 25.050 requirements
21. I hereby certify that the foregoing is true and correct to the best of my knowledg6 Questions? Carl Bill Lloyd265-653
Signed ~ E. ~ Title: Date
~ ~1~ A¢,~ ~ i,.~0 ~) Drilling Engineering Supervisor Pren~red bv Sharon AIl.¢un-Dr~k~
Commission Use Chi}
Permit Number APl number _ date See cover letter
/gS'-"~'~I 50-~:;)~-'ff'"'~///'"//~)~'--¢/ I Approval [~,--~:~-~"~q~ for other requirements
Conditions of approval Samples required FIYes [~ No Mud Icg required FI Yes .~ No
Hydrogen s,lfidemeasures D Yes J~ No Directior~al survey required .~ Yes D No
Required working pressure for BOPE D2M; FI 3M; ~ 5M; ~ 10M;D
Other: -~O~__~h ~)~, ~ .~--~%~
by order of .....(~
Approved by (~R~I,AL._. , _~., ~.~,__._,~_..,,..,....,S~(~I~ED'~Y Commissioner the commission Date I h{
Rubei~ N ~,~:
Form 10~401 Rev. 12/1/85 · Submit in triplicate
ARCO Alaska, Inc.
Post Office Box lbu360
Anchorage, Alaska 99510-0360
October 27, 1999
Robert Christenson, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501-3192
Re:
Application for Permit to Drill: KRU
Surface Location: :154' FNL :11.39' FWL Sec 20 T:12N R:IOE, UM
Target Location: :1672' I:NL, :1984' FEL Sec. 20, T:12N, R:IOE, UM
Bottom Hole Location: :137' FNL, 2313' FWL Sec. 29, T:12N, R:1OE, UM
Dear Commissioner Christenson,
ARCO Alaska, Inc. hereby applie r a Permit to Drill an onshore development
well to the Kuparuk interval from l'J2'pad in the Kuparuk River Unit ("KRU"). The
well is designed to penetrate and further develop the production potential of the
Kuparuk sands in the vicinity of 1R pad.
The well is designated as a horizontal sidetracked production well, exiting from the
existing 7" intermediate casing of the 1R-01 well. A 3-1/2" production liner will be
run and cemented and the well will be completed with 3-1/2" tubing.
Please find attached information as required by 20 AAC 25.005 (a) and (c) for
your review. Pertinent information attached to this application includes the
following:
1) Form 10-401 Application for Permit to Drill per 20 AAC 25.005 (a).
2) Fee of $100 payable to the State of Alaska per 20 AAC 25.005 (c) (1).
3) A directional plat showing the surface and bottomhole locations proposed
for the well per 20 AAC 25.005 (c) (2).
4) Directional plots and proximity calculations in accordance with the
requirements of 20 AAC 25.050.
5) A complete proposed casing and cementing program is attached as
per 20 AAC 25.030. A wellbore schematic is also attached visually
depicting the proposed well and completion design.
6) The drilling fluid program, in addition to the requirements set forth in
20 AAC 25.033 are attached in this APD package.
7) A copy of the proposed drilling program.
8) ARCO does not anticipate the presence of H2S in the formations to be 00~¢ ?_' 9 !999
encountered in this well. However, H2S monitoring equipment will be
functioning on the rigs as is the standard operating procedure in t~sk~ 0il & Gas C0ris. 00rri,.r¢t[ssi0.n
Kuparuk River Unit drilling operation. Anchora~¢
Robert Christenson
Application for Permit to Drill - 1R-01 a
Page 2
9)
Due to the large volume of regional information available, ARCO
considers this well to be a development well, and as such, no
mudlogging operations such as type log generation and sample
catching are planned. The following are ARCO's designated contacts
for reporting responsibilities to the Commission:
1)
2)
Completion Report
Technologist
(20 AAC 25.070)
Geologic Data and Logs
(20 AAC 25.071)
Sharon AIIsup-Drake, Drilling
263-4612
Mark Longden, Geologist
263-4506
The anticipated spud date for this well is November 25, 1999. If you have any
questions or require further information, please contact Bill Lloyd at (907) 265-
6531 or Chip Alvord at (907) 265-6120.
William"B. Lloy~ I !-- -' - '- - '
Senior Drilling Er~gi~eer
CC:
Kuparuk 1R-Ola Well File
Chip Alvord ATO- 1030
Jim Burd ATO-1282
I Well Name: I I R-01a
Well Plan Summary
Type of Well (producer or injector): I Producer
Surface Location:
154' FNL, 139' FWL, Sec. 20, T12N-R10E
Tie-in Survey: 1095' FNL, 2378' FEL, Sec. 20, T12N-R10E
Target #1 Start Location: 1672' FNL, 1984' FEL, Sec. 20, T12N-R10E
Target #2 Start Location: 1922' FNL, 1986' FEL, Sec. 20, T12N-R10E
Target #3 Start Location: 2122' FNL, 1988' FEL, Sec. 20, T12N-R10E
Target #4 Start Location: 2458' FSL, 2144' FEL, Sec. 20, T12N-R10E
Target #5 Start Location: !560' FSL, 2352' FEL, Sec. 20, T12N-R10E
Target #6 Start Location: 1060' FSL, 2456' FEL, Sec. 20, T12N-R10E
Target #7 Start Location: 262' FSL, 2466' FWL, Sec. 20, T12N-R10E
Target #8 Start Location: !37' FNL, 2313' FWL, Sec. 29, T12N-R10E
Bottom Hole Location: 137' FNL, 2313' FWL, Sec. 29, T12N-R10E
I AFE Number: I AK I I Rig: Pool 6
Estimated Start Date: I 11/25/99
Operating days to complete: I 26
KOP
MD:
TD MD:
6500'
12024'
KOP
TVD:
TD
TVD:
5249'ss
6540'ss
RKB/ 180'
Surface
Elevatio I5'
(a.m.s.I)
Well Design (conventional, slimhole, etc.): I Horizontal Sidetrack Producer
Objective: I Selectively geo-steer well to optimally drain 2 - Kuparuk A sand fault blocks
Formation Markers
Formation Tops MD TVD (SS) Remarks
Tie-In Survey 6498 5249 Build 10°/100'
KOP 6498 5249
EOC 6776 5488 End 10°/100'
C30 7212 5907
C20 7311 6OO2
7336 6026 Begin Build & turn; 10°/100'
Base HRZ 7371 6060
Top Kup C 7702 6347
Top B Shale 7760 6388
EOC 8114 6535 End 10°/100'
Target #1 - Top A4 8114 6535
Top A3 8367 6570
Target #2 - Top A3 8367 6570 Build 6°/100'
EOC 8489 6579 End 6°/100'
Target #3 - A3 t2 8567 6580 Build 6°/100'
EOC 8817 6587 End 6°/100'
Target #4 - A3 t3 9286 6605
Target #5 - A4 t2 10208 6605 Curve 3°/100'
EOC 20306 6602 End 3°/100' curve
Target #6 - A3 upthrn 10741 6580 Curve 3°/100'
EOC 11018 6574 End 3°/100' curve
11320 6578 Curve 3°/100'
Target #7 - A3 upthrn 11568 6575
EOC 11658 6570 End 3°/100' curve
Target #8 - TD 12022 6540
Casing/Tubin__cl Program
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MD/I'VD MD/'rVDss
6-1/8" 3-1/2" 9.3# L-80 EUE-Mod 5674' 6348'/5220' 12022'/6540'
tubing 3-1/2" 9.3# L-80 EUE-mod 6348' Surf. 6348'/5220'
General Mud Program
Production Mud Properties: LSND 6-1/8" hole section
Density Viscosity Yield 10 sec 10 min pH APl HTHP
(PPG) Point gel gel Filtrate Filtrate
11.0 45-50 20-24 6-8 8-10 8-9 4-6 10-13
Drilling Fluid System
Triple Derrick Shale Shakers
Desander, Desilter, Mud Cleaner
Centrifuge
Pit Level Indicator (Visual and Audio Alarm)
Trip Tank
Fluid Flow Sensor
Degasser Fluid Agitators
Drilling fluid practices will be in accordance with the regulations stated in 20 AAC 25.033.
Well Proximity Risks:
There are no close approach issues in this well plan.
Directional
KOP:
Maximum Hole Angle:
Close Approach Well:
Cement
+6500' MD (estimated)
94.7°
None
First Stage Second Stage
Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments
3-1/2" Liner 990/15.8/1.2 None 150' liner lap, TOC 200' above TOL, Class
"G" cement, 50% excess in open hole
Lo _qin_q Pro_qram
LWD Logging:
6-1/8" Hole MWD lAB directional / GR / Res
Open Hole Logs (eline):
6-1/8" Hole
Cased Hole Logs (eline):
None
None
Well Control
Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be
installed and will be capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics for Pool 6 are on file with AC)GCC.
Maximum anticipated surface pressure (MASP) while drilling the production hole is calculated using a KOP
leak-off of 13.5 ppg EMW (0.70 psi/ft) and a gas gradient of 0.11 psi/ft. This shows that formation
breakdown would occur at a surface pressure of 3,097 psi.
MASP = (5249 ft)(0.70 - 0.11)
= 3,097 psi
Based on offset well data, reservoir pressures in the Kuparuk sands in the vicinity of 1R pad are expected
to be -3,500 psi (0.54 psi/ft). Assuming a 150 psi overbalance is required to safely drill and trip in this
formation, then a required mud weight of 10.9 ppg can be predicted as the maximum mud weight needed
to safely drill in this formation, assuming a TVD of 6,432'. Target (Kuparuk C)
( 3500+ 150)/(0.052'6432 )= 10.9.
Hazards
· This well will penetrate -160' of HRZ at 16° in the 6-1/8" section. Good drilling practices, including
optimized flow rates of 240-250 gpm, slower trip and connection speeds, pumps at 40% when reaming
connections, larger nozzle area for reduced sidewall erosion, all will assure a trouble free interval.
· There is I known fault in the reservoir interval, anticipated to be ~30' throw. Lost circulation across the
faults will be controlled with non-productive zone LCM pills.
· Lost circulation across the fault, into the reservoir matrix, or wellbore "breathing" into exposed shales
as a function of excessive ECD (equivalent circulating density). ECD will be controlled and monitored
with the addition of a PWD (pressure-while-drilling) sub in the BHA.
Disposal
Cuttings should be processed with the Pool 6 ball mill and transported to DS1R-18 for injection.
Fluid Handling: All drilling and completion fluids and other Class II wastes to DS1R:18 for injection.
Haul all Class I waste to Pad 3 for disposal. Cement rinseate must be processed through the MI
unit prior to injection in DS1R-18.
1R-Ola Short Well Summary
Pre-Rig Work:
NOTE: If any problems are observed with the 7" packoff during pre-rig operations, notify the Operations
Drilling Engineer, Pool 6 Company Representative and the wellhead manufacturer. Repairs will be made
prior to initiation of rig work.
1. RU wireline and dummy off GLM's at 2279', 4295', 5543', 6234', 6672', 7113', 7487' and 7902'. Test
7" and tubing packoffs to 5000 psi and function LD screws. Pressure test 7" casing to 3500 psi for 30
mins.
2. RIH and set blanking plug in D nipple at 8141' MD to isolate A sand. Pressure test tubing to insure
plug is set. RIH and pull isolation sleeve from AVA at 8128' MD to open C sand.
3. RU pump truck and perform C sand injectivity test for CTU squeeze. Bullhead +/-15 bbls of diesel
down tubing into C sand perforations. Record all pressures and rates.
MIRU electric line and RI tubing with collar Iocator and 3-1/2" cement retainer to +/-7980' MD. Set
retainer in the middle of the 6' pup joint below the Camco HRP-1-SP packer and above the Camco
MMG-W 1.5" mandrel.
5. RU CTU. RIH and sting into cement retainer. Establish injection into C sand perfs and record
breakdown pressure and rate. Note final rate and pressure on morning report.
Squeeze 31 bbls of 15.8 ppg Class G cement below the retainer as follows: 6 bbls for the 3-1/2" tubing
and 3-1/2" x 7" annular volume between packers, and 25 bbls into the C sand perfs. Unsting from
retainer and circulate any excess cement from well bore. RDMO CTU.
7. RU slickline unit. RIH and pull dummy valve from bottom GLM and leave pocket open.
RU e-line unit. RIH and cut 3'/2" tubing at +/-7930' MD. Target the middle of the first full joint above
the HRP-1-SP packer. (Note: Utilize most efficient cuttin.q mechanism. Remaininq tubing below cut
will not be further utilized) RD electric line.
9. Circulate seawater through cut until clean returns are observed. Freeze protect tubing and annulus to
2200' with diesel. Bleed pressures on tubing/annulus. Zero pressure on all annuli is required.
10. Set and test BPV, remove well house and flow lines, level pad and dig out cellar. Notify Operations
Drilling Engineer upon completion of work.
Rig Work:
1. If 7" packoff does not test during pre-rig, contact the wellhead manufacturer's representative to initiate
repairs.
2. MIRU. Pull BPV and set and test TWCV to 1000 psi. ND tree and NUBOPE and test same per AAI
policy. Pull TWCV.
3. Circulate out freeze protection with seawater and attempt to pull 31/=" tubing above cut at -7930'.
Have grapple and spears available to fish remaining tubing in the event of additional parts.
.
.
RU wire line and make a CCL/gauge ring/junk basket run to ~7000'. RD wireline. PU 7" CIBP on wire
line, RIH and set @ 6515'. Use CET log dated 9/9/85 as tie-in correlation log. Test 7" and bridge plug
to 3500 psi.
PU Baker Bottom Trip Anchor whipstock and BHA and RIH. Install ditch magnets in troughs. RIH to
-6400' and establish string parameters. Continue in hole to CIBP and orient and set whipstock.
6. Displace well to milling/drilling fluid. Shear whipstock bolt and begin milling window in 7". Mill until 29'
of BHA is in the open hole. Circulate well clean until no metal is seen in returns. Perform LOT to a
minimum of 12.5 ppg. POOH and LD milling assembly.
7. PU 6V8" BHA and RIH. Displace wellbore to 10.9 ppg drilling fluid and drill 6'/8" horizontal wellbore to
12022' MD. Use MWD/GR/Res in real time for evaluation.
8. Run 3~/2'' solid liner to TD and cement.
9. Run 3'/2" L-80 standard Kuparuk gas lift completion. Circulate freeze protection to 2200'. Sting SBE
into PBR on top of liner top packer.
10. Set and test TWCV to 1000 psi. ND BOPE, NU Tree. Pull TWCV and set/test BPV. RDMO.
Crected by finch FOR: LLOYD
Dote plotted: 25-0ct-1999
Plot Reference is lA Version ~10.
ICoordTnetes ore ;n feet. reference Blot ~IA.
I'frue Vertical aepths~ce rkb Pool ~6
ARCO Alaska,
InC.
Structure : Pad 1R Well: lA
Field : Kuparuk River Unit Location : North Slope, Alaska
4800 -
5000 -
5200
fl)
5400
fl)
¢- 5600
5800
0
6000
>.
fl) 6200
I 6400
¥
6600
68O0
7000
7 W~ndow J
EOC
Begin Build & Turn
B/HRZ - T/Kolub]k
195.0 AZIMUTH
***Plane of Proposal***
/
k 43.53 Sidetrack Point
33.53
23.53 DLS: 10.00 deg per 100 ft
I I I I I I I I I I I I I I I I I I I I I I I I I II I II I I I I I I I I I I I I I I I I I I I I I
400 200 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 ,5200 5400 3600 5800 4000 4200 4400 4600
Verficol Section (feet) ->
Azimuth 195.00 with reference 0.00 5, 0.00 W from slot #lA
Cmo~ed by finch
DO~ plc~ed: 25-Oct-tgc~
C~t~ om ~n ~ mf~ slot ~1~
Tree V~l O~s om ~mn~ ~b Pool
ARCO Alaska, Inc.
Structure: Pad 1R Well : lA
Field: Kuparuk River Unlf Location : North Slope, Alaska
900 1200
I I I
SIDETRACK POINT:
1095' FNL, 2578' FEL
SEC. 20, T12N, RIOE
TARGET #1:
1672' FNL, 1984' FEL
SEC. 20, T12N, RIOE
TARGET #2:
1922' FNL, 1986' F-EL
SEC. 20, T12N, RIOE
TARGET
2122' FNL, 1988' FEL
SEC. 20, T12N, RIOE
TARGET #4: I
2¢58' FSL, 2144' FEL
SEC. 20, T12N, RIOE
TARGET #5: I
1560' FSL, 2352' FEL
SEC. 20, T12N, RIOE
TARGET #6:
1060' FSL, 2456' FEL
SEC. 20, T12N, RIOE
TARGET #7:
262' FSL, 24-66' FWL
SEC. 20, T12N, RIOE
TARGET #§ - TD LOCATION:
137' FNL, 2313' FWL
SEC. 29, T12N, RIOE
1500
.
East (feet) ->
1800 2100 2400 2700 3000 3300 3600 3900 4200 4500 4800
I I I I I I I I I I I I I I I I I I I I I I
~._ Sidetrock Point 7 Window
B/HRZ - T/Kolubi~
I ~ I EOC
Begin Build & Turn
Forget #4-A3 t3/EOC
Torget #5-A4- t2/Begin Build
EOC
Torget #6-A3 UpThrn/Begin Drop&Turn
EOC
Begin Build&Turn
Torget #7-A3 UpThrn t2/Begin Build
EOC
Torget #8-TD/Coslng Pt
5100
I
60O
9OO
1200
1500
1800
2100
2400
2700
3000
5600
3900
4200
45OO
48O0
5100
5400
5700
I
V
Dnte p~of~J: 25-0ct-1999
Plot Reference ~s IA Version
Coord[n=~;; =re ;n feet re~er~nce
True Vent~cal Oepb"~ am raFm'e-nc;e r'kb
c~t~d ~ r,~h FOR: LLOYD
Ai CO Alaska, Inc.
Struoture : Pad 1R Well : lA
Field : Kuparuk River Unit Location : Norlh Slope, Alaska
East (feet) ->
1950 2100 2250 2400 2550 2700 2850 3000 5150 5500 3450 5600 3750 3900 4050 4200
500 I I I I I I I I I ! I I I I I I I I I I I I I I I I I I i 500
450
600
~_700
2900
3100
3300
35OO
450
600
500
750 5500 3700 750
4900 3700
3900
3900
5100 4100
900 900
~e on - 5328.57 Tvd, 5.39 E 4300
5900 4500
1050 5700 1050
6500 5900
6100
6500
1200 6500 1200
6500 6700
3900
4100
3100
4300
4500
Target - 6615.00 Tvd, 1516.95 S, 3162.93 E
Target - 6650.00 Tvd, 1766.96 S, 3161.60 E
1550
1500
1650
I
V 1800
1350
1500
1650
I
1800 V
1950
2100
2250
2400
2550
270O
3500 4700
4900
Target - 6685.00 Tvd, 2666.25 S, 3006.81 E
Target - 6660.00 Tvd, 1966.97 S, 5160.54 E
3900
5300
41 O0
55OO
4300
57OO
1950
2100
2250
2400
255O
2700
2850 , , , , , , , , , , ~ , , , , , , , , , , , , , 2850
1950 2100 2250 2400 2550 2700 2850 5000 5150 3500 5450 5600 5750 5900 4050 4200
East (feet) ->
Ic~t~ ~ ~nc~ FOR: LLOYD
Dote plotted: ~-1~9
PI~ Ref~n~ ~ IA V~ ~10.
ARCO Alaska, Inc.
Structure : Pad 1R Well : lA
Field : Kuparuk River Unit Location : North Slope, Alaska
400
800
1200
1600
2000
2400
2800
.=1,.=
O~ 5200
-~- 5600
0
4000
I
v
4400
4800
5200
5600
6000
64O0
6800
East ([feet) ->
400 800 1200 1600 2000 2400 2800 5200 5600 4000 4400 4800 5200 5600 6000 6400
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 400
2gO~O 5500 5500 5700 5goo
900 3700
610
6500
650(
670(
4500
4700
4900
5100
5300
5500
6100
6500
6500
2100 3300
2300 3500 5300
5700
5900
4100
43OO
3100
3300
5500
4100 4100
4300
45O0
4700
6300 '""---~6100
6500 ~""---~500 4900 5300 5700
Target - 6615.00Tvd, 1516.93 S, 5152.95 E
490(
5100
Target - 6650.00 Tvd, 1766.96 S, 3161.60 E
ITorgetO - 6660.00 Tvd, 1966.97 S, 3160.54 E
4100
4300
4500
J, 2666.23 S, 5006.81E
4700
5900
4900
6100
5100
~6~00
,.65oo
% 6700
Target - 6685.00 Tvd, 3565.2~k.S, 2802.02 E
5500
55OO
Target - 6660.00 Tvd, 4084.77 S, 2685.67 E
6100
800
1200
16oo
2OOO
2400
2800
0
3200
5700 5600 '-~
5900 P
4000 I
V
~- 4400
let - 6655.00 Tvd, 4860.00 S, 2400.00 E
& Target - 6620.00 Tvd, 5262.21 S, 2192.94 E
o
~63~~ 6500
6500 0
i i i J(]sI i i i i i i i i i I i i i i i i i i i i i i i i i i i i
400 800 1200 1600 2000 2400 2800 5200 5600 4000 4400 4800 5200 5600 6000 6400
East (feet) ->
4800
52OO
56OO
6O0O
6400
6800
Creoted by rixee FO~: LLOYD
Date plotted : 25-0ct-1999
Plot Reference Ts lA Version ~10.
Coord~notes ere ~n feet reference slot t~lA.
'[rue Vertlcol Depths ore reference rkb Pool 1~6
INTEQ
AI CO Alaska, Inc.
Structure: Pod 1R Well: lA
Field: Kuperuk River Unif Locoflon : North Slope, AlaskQ
PROFILE
COMMENT
Point MD Inc Dir TVD
Sidetrack Point 6498.02 43.73 105.90 5328.58
EOC 6776.72 1 5.86 106.85 5568.07
C30 7212.23 1 5.86 106.83 5987.00
C20 7310.99 1 5.86 106.83 6082.00
Begin Build & Turn 7335.60 15.86 106.83 6105.67
B/HRZ - T/Kalubik 7371.39 17.06 118.75 6140.00
Top C 7701.71 42.84 165.24 6427.00
Top B Shale 7760.28 48.27 168.30 6468.00
EOC 8114.1 6 82.03 180.50 6615.00
Target # 1 -Top A4/EOCg?;-i- 8114.18 82.03 180.30 6615.00
Top A3 8566.66 82.03 1 80.30 6650.00
Target #2-Top A3/Begg?~- 8366.68 82.03 180.50 6650.00
EOC 8489.20 89.58 1 80.30 6659.1 6
Target #3-A5 t2/Begig?T 8567.13 89.38 180.51 6660.00
EOC 8816.65 87.48 195.16 6666.87
Begin Build & Turn 9171.13 87.48 195.16 6682.48
Target #4-A3 t3/EOC 9285.57 90.00 192.83 6685.00
Target #5-A4 t2/Begig?T 10207.61 90.00 192.83 6685.00
EOC 10306.26 92.96 192.83 6682.45
Target #6-A3 UpThrn/g?T 10741.07 92.96 192.85 6660.00
EOC 11017.99 89.34 200.32 6654.43
Begin Build&Turn 11320.90 89.34 200.32 6657.90
Target #7-A3 UpThrn g?T 11568.11 92.00 207.24 6655.00
EOC 11 657.75 94.69 207.24 6649.77
Target #8-TD/Casing g?T 12021.82 94.69 207.24 6620.00
DATA
North
-959.61
-977.78
-1012.25
-1020.06
-1022.01
-1025.95
-1161.64
-1202.53
-1516.95
-1516.95
-1766.96
-1766.98
-1889.07
-1966.99
-2213.45
-2555.26
-2666.26
-3565.27
-3661.41
-4084.79
-4349.92
-4633.96
-486O.O2
-4939.58
-5262.19
East
2766.40
2898.10
3012.03
3037.86
3044.30
3053.59
3126.72
3136.23
3162.93
3162.93
3161.60
3161.60
3160.95
3160.54
3127.09
3034.47
3006.81
2802.01
2780.11
2685.66
2604.74
2499.58
2399.99
2559.05
2192.95
V. Sect
191.60
194.38
198.18
199.05
199.26
200.67
512.80
349.65
646.62
646.64
888.47
888.49
1006.58
1081.96
1328.67
1682.81
1797.19
2718.57
2817.10
5251.02
3527.54
3829.15
4073.26
4160.70
4515.51
Deg/lO0
10.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
0.92
0.00
6.00
6 O0
6.00
0.00
0.93
3.00
3.00
3.00
3.00
0.00
3.00
3.00
0.00
c.,-.~ ~/~ FOR: LLOYD
Date plated: 25~-1~
Pl~ Ref~nce Is tA V~I~ ~10.
33O
3~0
ARCO Alaska, Inc.
Structure : Pad 1R Well : lA
Field : Kuparuk River Unlt Location : Nor-th Slope, Alaska
TRUE NORTH
350 0 10
340 20
30
40
310 50
3OO
60
2go
70
280
270
3O
80
90
260
100
250
110
240 120
230 130
220 140
210 150
200 1 60
190 180 170
Normal Plane Travelling Cylinder - Feet
All depths shown (]re Measured depths on Reference Well
ARCO Alaska, Inc.
Pad 1R
lA
slot #lA
Kuparuk River Unit
North Slope, Alaska
PROPOSAL LISTING
INCLUDING POSITION UNCERTAINTIES
by
Baker Hughes INTEQ
Your ref : lA Version #10
Our ref : prop3679
License :
Date printed : 23-0ct-1999
Date created : 22-0ct-1999
Last revised : 23-0ct-1999
Field is centred on n70 16 18.576,w150 5 56.536
Structure is centred on n70 23 12.884,w149 40 37.889
Slot location is n70 23 11.369,w149 40 33.820
Slot Grid coordinates are N 5991049.979, E 539829.377
Slot local coordinates are 154.00 S 139.00 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
ARCO Alaska, Inc.
Pad IR, lA
Kuparuk River Unit,North Slope, Alaska
PROPOSAL LISTING Page 1
Your ref : lA Version#10
Last revised : 23-0ct-1999
Measured Inclin. Azimuth True Vert R E C T A N G U L A R Dogleg Vert
Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect
6498.00 43,73 105.90 5328,57 939.61S 2766.39 E 0.00 191.60
6498.02 43.73 105.90 5328.58 939.61 S 2766.40 E 10.00 191.60 Sidetrack Point
6500,00 43.53 105.90 5330.02 939.99 S 2767.71 E 10.00 191.62
6600.00 33.53 106.07 5408.15 957.11 S 2827.52 E 10.00 192.68
6700.00 23.53 106.37 5495.89 970.42 S 2873.33 E 10.00 193.68
6776.72 15.86 106.83 5568.07 977.78 S 2898.10 E 10.00 194.38 EOC
7000.00 15.86 106.83 5782.85 995.45 S 2956.51 E 0.00 196,33
7212.23 15.86 106.83 5987.00 1012,25 S 3012.03 E 0.00 198.18 C30
7310.99 15.86 106.83 6082.00 1020.06 S 3037.86 E 0.00 199.05 C20
7335.60 15.86 106.83 6105.67 1022.01 S 3044.30 E 0.00 199.26 Begin Build & Turn
7371.39 17.06 118.75 6140.00 1025.95 S 3053.59 E 10.00 200.67 B/HRZ - T/Kalubik
7400.00 18.46 126.95 6167.25 1030.69 S 3060.89 E 10.00 203.36
7500.00 25.29 146.88 6260.12 1058.17 S 3085.27 E 10.00 223.59
7600.00 33.66 158.10 6347.17 1101.89 S 3107.34 E 10.00 260.10
7700.00 42,68 165.14 6425.74 1160.51 S 3126.42 E 10.00 311.79
7701.71 42.84 165.24 6427.00 1161.64 S 3126.72 E 10.00 312.80 Top C
7760.28 48.27 168.30 6468.00 1202.33 S 3136.23 E 10.00 349.65 Top B Shale
7800.00 52.00 170,09 6493.45 1232.27 S 3141.93 E 10.00 377.09
7900.00 61,48 173.91 6548.25 1314.98 S 3153.40 E 10.00 454.01
8000.00 71.05 177.09 6588.46 1406.12 S 3160.48 E 10.00 540.22
8100.00 80,67 179.92 6612.87 1502.94 S 3162.96 E 10.00 633.09
8114.16 82,03 180.30 6615.00 1516.93 S 3162.93 E 10.00 646.62 Target #1 Top A4-1ROiA
8114.18 82.03 180.30 6615.00 1516.95 S 3162.93 E 0.00 646.64 Target #1-Top A4/EOC
8134.66 82.03 180.30 6617.84 1537.24 S 3162.82 E 0.00 666.26
8234.66 82.03 180.30 6631,71 1636.27 S 3162.30 E 0.00 762.06
8334.66 82.03 180.30 6645.57 1735.31 S 3161.77 E 0.00 857.85
8366.62 82,03 180.30 6650.00 1766.95 S 3161.60 E 0.00 888.46 Top A3
8366.66 82.03 180.30 6650.00 1766.96 S 3161.60 E 0.00 888.47 Target#2 Top A3-1ROiA
8366,68 82.03 180,30 6650,00 1766.98 S 3161.60 E 6.00 888.49 Target#2-Top A3/Begin Build
8399.45 84.00 180.30 6653.99 1799.50 S 3161.43 E 6.00 919.95
8489.20 89,38 180.30 6659.16 1889.07 S 3160.95 E 6.00 1006.58 EOC
8500.00 89.38 180.30 6659.28 1899,87 S 3160.90 E 0.00 1017.03
8567.11 89,38 180.30 6660.00 1966.97 S 3160.54 E 0.00 1081.94 Target #3-A3 Tgt2 1RO1A
8567.13 89.38 180.31 6660.00 1966.99 S 3160.54 E 6.00 1081.96 Target#3-A3 t2/Begin Drop & Turn
8600.00 89.13 182.26 6660.43 1999,85 S 3159.80 E 6.00 1113.89
8700.00 88.36 188.21 6662.62 2099.36 S 3150.68 E 6.00 1212.37
8800.00 87.60 194.17 6666.16 2197.36 S 3131.30 E 6.00 1312.04
8816.65 87.48 195.16 6666.87 2213.45 S 3127.09 E 6.00 1328.67 EOC
9000.00 87.48 195.16 6674.95 2390,25 S 3079.18 E 0.00 1511.85
9171.13 87.48 195.16 6682.48 2555.26 S 3034.47 E 0,00 1682.81 Begin Build & Turn
9200.00 88.11 194.57 6683.59 2583.14 S 3027.07 E 3.00 1711.66
9285.55 90.00 192,83 6685.00 2666.23 S 3006.81 E 3.00 1797.17 Target #4 A3-Tgt3 1ROiA
9285.57 90.00 192,83 6685.00 2666.26 S 3006.81 E 0.93 1797.19 Target~4-A3 t3/EOC
9500,00 90.00 192.83 6685.00 2875.33 S 2959.18 E 0.00 2011.47
10000.00 90.00 192.83 6685,00 3362.84 S 2848.13 E 0.00 2511.11
10207.59 90.00 192.83 6685.00 3565.25 S 2802.02 E 0.00 2718.55 Target ~5 A4-Tgt2 1RO1A
10207.61 90.00 192.83 6685.00 3565.27 S 2802.01 E 3.00 2718,57 Target#5-A4 t2/Begin Build
10306.26 92.96 192.83 6682.45 3661.41 S 2780.11 E 3.00 2817.10 EOC
10500.00 92.96 192.83 6672.45 3850.06 S 2737.14 E 0.00 3010.45
10741.05 92.96 192.83 6660.00 4084.77 S 2683.67 E 0.00 3251.00
All data is in feet unless otherwise stated.
Coordinates from slot #lA and TVD from rkb Pool ~6 (80,00 Ft above mean sea level).
Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead.
Total Dogleg for wellpath is 152.86 degrees.
Vertical section is from S 0.00 W 0.00 on azimuth 195,00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARco Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit,North Slope, Alaska
Measured Inclin. Azimuth True Vert R E C T A N G U L A R
Depth Degrees Degrees Depth C 0 0 R D I N A T E S
PROPOSAL LISTING Page 2
Your ref : 1AVersion #10
Last revised : 23-0ct-1999
Dogleg Vert
Deg/lOOft Sect
10741.07 92.96 192.83 6660.00 4084.79 S 2683.66 E 3.00 3251.02 Target #6-A3 UpThrn/Begin Drop&Turn
10800.00 92.19 194.43 6657.35 4142.00 S 2669.79 E 3,00 3309.88
10900.00 90.89 197.13 6654.66 4238.19 S 2642.61 E 3.00 3409.82
11000.00 89.58 199.83 6654.26 4333.02 S 2610.92 E 3.00 3509.62
11017.99 89.34 200,22 6654.43 4349.92 S 2604.74 E 3.00 3527.54 EOC
11320.90 89.34 200.32 6657.90 4633.96 S 2499.58 E 0.00 3829.13 Begin Build&Turn
11400,00 90.19 202.53 6658.22 4707.60 S 2470.69 E 3.00 3907.73
11500.00 91.27 205.33 6656.94 4798.98 S 2430.14 E 3.00 4006.49
11568.09 92.00 207.24 6655.00 4860.00 S 2400.00 E 3.00 4073.23
11568.11 92.00 207,24 6655.00 4860.02 S 2399.99 E 3.00 4073.26 Target#7-A3 UpThrn t2/Begin Build
11600.00 92.96 207.24 6653.62 4888.35 S 2385.41 E 3.00 4104.39
11657.75 94.69 207.24 6649.77 4939.58 S 2359.03 E 3.00 4160.70 EOC
12000.00 94.69 207.24 6621.79 5242.85 S 2202.91 E 0.00 4494.05
12021.82 94,69 207.24 6620.00 5262.19 S 2192.95 E 0.00 4515.31Target#8-TD/Casing Pt
12021.84 94.69 207.24 6620.00 5262.21 S 2192.94 E 0.00 4515.33 Target#SA4-Toe 1ROiA
All data is in feet unless otherwise stated,
Coordinates from slot #lA and TVD from rkb Pool ~6 (80.00 Ft above mean sea level).
Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead.
Total Dogleg for wellpath is 152.86 degrees.
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit,North Slope, Alaska
PROPOSAL LISTING Page 3
Your ref : lA Version #10
Last revised : 23-0ct-1999
Comments in wellpath
MD TVD Rectangular Coords. Comment
6498.02 5328.58 939
6776.72 5568.07 977
7212.23 5987.00 1012
7310.99 6082.00 1020
7335,60 6105.67 1022
7371.39 6140.00 1025
7701.71 6427.00 1161
7760.28 6468,00 1202
8114.16 6615.00 1516
8114.18 6615.00 1516
8366.62 6650.00 1766
8366.66 6650.00 1766
8366.68 6650.00 1766
8489.20 6659.16 1889
8567.11 6660,00 1966
8567.13 6660.00 1966
8816.65 6666,87 2213
9171.13 6682.48 2555
9285,55 6685.00 2666
9285.57 6685.00 2666.
10207.59 6685.00 3565.
10207.61 6685.00 3565,
10306.26 6682.45 3661.
10741.07 6660.00 4084.
11017.99 6654.43 4349.
11320.90 6657.90 4633.
11568.11 6655.00 4860.
11657,75 6649.77 4939.
12021.82 6620.00 5262.
12021.84 6620.00 5262.
61 S
78 S
25 S
06 S
01 S
95 S
64 S
33 S
93 S
95 S
95 S
96 S
98 S
07 S
97 S
99 S
45 S
26 S
23 S
26 S
25 S
27 S
41 S
79 S
92 S
96 S
02 S
58 S
19 S
21 S
2766.40 E
2898.10 E
3012.03 E
3037.86 E
3044.30 E
3053.59 E
3126.72 E
3136.23 E
3162,93 E
3162.93 E
3161.60 E
3161.60 E
3161.60 E
3160.95 E
3160.54 E
3160.54 E
3127.09 E
3034.47 E
3006.81 E
3006 81 E
2802 02 E
2802 01E
2780 11 E
2683 66 E
2604 74 E
2499 58 E
2399 99 E
2359 03 E
2192.95 E
2192.94 E
Sidetrack Point
EOC
C30
C20
Begin Build & Turn
B/HRZ - T/Kalubik
Top C
Top B Shale
Target #1 Top A4-1ROIA
Target #1-TopA4/EOC
Top A3
Target #2 Top A3-1ROIA
Target#2-Top A3/Begin Build
EOC
Target #3-A3 Tgt2 1RO1A
Target #3-A3 t2/Begin Drop & Turn
EOC
Begin Build & Turn
Target ~4 A3-Tgt3 1ROIA
Target #4-A3 t3/EOC
Target ~5 A4-Tgt2 1ROIA
Target#5-A4 t2/Begin Build
EOC
Target #6-A3 UpThrn/Begin Drop&Turn
EOC
Begin Build&Turn
Target#7-A3 UpThrn t2/Begin Build
EOC
Target#8-TD/Casing Pt
Target#8A4-Toe 1RO1A
Casing positions in string 'A'
Top MD Top TVD Rectangular Coords. Bot MD BotTVD Rectangular Coords. Casing
n/a 5328.57 939.61S 2766.39E 6498.00 5328.57 939.61S 2766.39E 7" Window
n/a 5328.57 939.61S 2766.39E 12021.80 6620,00 5262.17S 2192.96E 3 1/2" Liner
Targets associated with this wellpath
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
Target #7 A3-UpThrnT 542200
Target #6 A3-UpThrn 542550
Target #1TopA4-1RO 543000
Target#2 Top A3-1RO 543000
Target #3-A3 Tgt2 1R 543000
Target #4 A3-Tgt3 1R 542850
Target#5 A4-Tgt2 1R 542650
Target#8 A4-Toe 1RO 542050
000
000
000
000
000
000
000
000
,5986200.000 0
,5987000.000 0
5989550.000 0
5989300.000 0
,5989100.000 0
,5988400.000 0
,5987500.000 0
,5985800.000,0
0000 6655
0000 666O
0000 6615
0000 6650
0000 6660
0000 6685
0000 6685
0000 6620
O0 4862.97S
O0 4064.76S
O0 1516.93S
O0 1766.96S
O0 1966.97S
O0 2666.23S
O0 3565.25S
O0 5262.21S
2345,08E 20-Sep-1999
2699.36E 20-Sep-1999
3162,93E 9-Jun-1999
3161.60E 20-Sep-1999
3160.54E 20-Sep-1999
3006.81E 20-Sep-1999
2802.02E 20-Sep-1999
2192.94E 20-Sep-1999
ARCO Alaska. Inc.
Pad IR, lA
Kuparuk River Unit,North Slope, Alaska
Measured Inclin. Azimuth True Vert R E C T A N G U L A R
Depth Degrees Degrees Depth C 0 0 R D I N A T E S
PROPOSAL LISTING Page 1
Your ref : lA Version #10
Last revised : 25-0ct-1999
Vert Ellipse Semi Axes Minor
Sect Major Minor Vert. Azi.
6498.00 43.73 105.90 5328.57 939.61S 2766.39 E 191.60 65.44 26.96 21.62 288.94
6498.02 43.73 105.90 5328.58 939.61 S 2766.40 E 191.60 65.44 26.96 21.62 288.94
6500.00 43.53 105.90 5330.02 939.99 S 2767.71 E 191.62 65.46 26.96 21.63 288.94
6600.00 33.53 106.07 5408.15 957.11S 2827.52 E 192.68 66.34 27.29 21.91 288.89
6700.00 23.53 106.37 5495.89 970.42 S 2873.33 E 193.68 67.06 27.60 22.13 288.86
6776.72 15.86 106.83 5568.07 977.78 S 2898.10 E 194.38 67.47 27.84 22.27 288.84
7000.00 15.86 106.83 5782.85 995.45 S 2956.51 E 196.33 68.71 28.55 22.68 288.79
7212.23 15.86 106.83 5987.00 1012.25 S 3012.03 E 198.18 69.98 29.23 23.06 288.75
7310.99 15.86 106.83 6082.00 1020.06 S 3037.86 E 199.05 70.57 29.55 23.24 288.73
7335.60 15.86 106.83 6105.67 1022.01 S 3044.30 E 199.26 70.72 29.63 23.28 288.72
7371.39 17.06 118.75 6140.00 1025.95 S 3053.59 E 200.67 70.96 29.75 23.35 288.78
7400.00 18.46 126.95 6167.25 1030.69 S 3060.89 E 203.36 71.16 29.84 23.40 288.83
7500.00 25.29 146.88 6260.12 1058.17 S 3085.27 E 223.59 71.91 30.18 23.62 289.29
7600.00 33.66 158.10 6347.17 1101.89 S 3107.34 E 260.10 72.74 30.57 23.88 290.05
7700.00 42.68 165.14 6425.74 1160.51 S 3126.42 E 311.79 73.62 31.06 24.21 291.08
7701.71 42.84 165.24 6427.00 1161.64 S 3126.72 E 312.80 73.63 31.07 24.22 291.10
7760.28 48.27 168.30 6468.00 1202.33 S 3136.23 E 349.65 74.17 31.43 24.46 291.85
7800.00 52.00 170.09 6493.45 1232.27 S 3141.93 E 377.09 74.54 31.67 24.62 292.36
7900.00 61.48 173.91 6548.25 1314.98 S 3153.40 E 454.01 75.50 32.43 25.12 293.84
8000.00 71.05 177.09 6588.46 1406.12 S 3160.48 E 540.22 76.47 33.32 25.71 295.47
8100.00 80.67 179.92 6612.87 1502.94 S 3162.96 E 633.09 77.44 34.33 26.39 297.23
8114.16 82.03 180.30 6615.00 1516.93 S 3162.93 E 646.62 77.58 34.49 26.49 297.48
8114.18 82.03 180.30 6615.00 1516.95 S 3162.93 E 646.64 77.58 34.49 26.49 297.48
8134.66 82.03 180.30 6617.84 1537.24 S 3162.82 E 666.26 77.79 34.71 26.63 297.85
8234.66 82.03 180.30 6631.71 1636.27 S 3162.30 E 762.06 78.86 35.86 27.37 299.68
8334.66 82.03 180.30 6645.57 1735.31 S 3161.77 E 857.85 80.01 37.09 28.12 301.56
8366.62 82.03 180.30 6650.00 1766.95 S 3161.60 E 888.46 80.40 37.49 28.37 302.17
8366.66 82.03 180.30 6650.00 1766.96 S 3161.60 E 888.47 80.40 37.49 28.37 302.17
8366.68 82.03 180.30 6650.00 1766.98 S 3161.60 E 888.49 80.40 37.49 28.37 302.17
8399.45 84.00 180.30 6653.99 1799.50 S 3161.43 E 919.95 80.81 37.90 28.62 302.81
8489.20 89.38 180.30 6659.16 1889.07 S 3160.95 E 1006.58 81.99 39.05 29.35 304.59
8500.00 89.38 180.30 6659.28 1899.87 S 3160.90 E 1017.03 82.14 39.19 29.44 304.80
8567.11 89.38 180.30 6660.00 1966.97 S 3160.54 E 1081.94 83.08 40.05 29.99 306.15
8567.13 89.38 180.31 6660.00 1966.99 S 3160.54 E 1081.96 83.08 40.05 29.99 306.15
8600.00 89.13 182.26 6660.43 1999.85 S 3159.80 E 1113.89 83.53 40.48 30.27 306.82
8700.00 88.36 188.21 6662.62 2099.36 S 3150.68 E 1212.37 84.71 41.89 31.12 308.83
8800.00 87.60 194.17 6666.16 2197.36 S 3131.30 E 1312.04 85.74 43.49 31.97 310.87
8816.65 87.48 195.16 6666.87 2213.45 S 3127.09 E 1328.67 85.92 43.77 32.12 311.22
9000.00 87.48 195.16 6674.95 2390.25 S 3079.18 E 1511.85 88.07 46.96 33.72 315.29
9171.13 87.48 195.16 6682.48 2555.26 S 3034.47 E 1682.81 90.49 49.99 35.26 319.39
9200.00 88.11 194.57 6683.59 2583.14 S 3027.07 E 1711.66 90.94 50.49 35.52 320.11
9285.55 90.00 192.83 6685.00 2666.23 S 3006.81 E 1797.17 92.43 51.86 36.30 322.22
9285.57 90.00 192.83 6685.00 2666.26 S 3006.81E 1797.19 92.43 51.86 36.30 322.22
9500.00 90.00 192.83 6685.00 2875.33 S 2959.18 E 2011.47 96.66 55.03 38.30 327.50
10000.00 90.00 192.83 6685.00 3362.84 S 2848.13 E 2511.11 109.10 60.78 43.08 338.49
10207.59 90.00 192.83 6685.00 3565.25 S 2802.02 E 2718.55 115.15 62.55 45.10 342.18
10207.61 90.00 192.83 6685.00 3565.27 S 2802.01 E 2718.57 115.15 62.55 45.10 342.18
10306.26 92.96 192.83 6682.45 3661.41 S 2780.11 E 2817.10 118.17 63.27 46.07 343.74
10500.00 92.96 192.83 6672.45 3850.06 S 2737.14 E 3010.45 124.31 64.54 47.99 346.47
10741.05 92.96 192.83 6660.00 4084.77 S 2683.67 E 3251.00 132.30 65.87 50.40 349.34
All data is in feet unless otherwise stated.
Coordinates from slot #lA and TVD from rkb Pool #6 (80.00 Ft above mean sea level).
Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead.
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit,North Slope. A1 aska
Measured Inclin. Azimuth True Vert R E C T A N G
Depth Degrees Degrees Depth C 0 0 R D I N
10741.07 92.96 192.83 6660.00 4084.79 S
10800.00 92.19 194.43 6657.35 4142.00 S
10900.00 90.89 197.13 6654.66 4238.19 S
11000.00 89.58 199.83 6654.26 4333.02 S
11017.99 89.34 200.32 6654.43 4349.92 S
11320.90 89.34 200.32 6657.90 4633.96 S
11400.00 90.19 202.53 6658.22 4707.60 S
11500.00 91.27 205.33 6656.94 4798.98 S
11568.09 92.00 207.24 6655.00 4860.00 S
11568.11 92.00 207.24 6655.00 4860.02 S
11600.00 92.96 207.24 6653.62 4888.35 S
11657.75 94.69 207.24 6649.77 4939.58 S
12000.00 94.69 207.24 6621.79 5242.85 S
12021.82 94.69 207.24 6620.00 5262.19 S
12021.84 94.69 207.24 6620.00 5262.21 S
ULAR
ATES
2683.66
2669.79
2642.61
2610.92
2604.74
2499.58
2470.69
2430.14
2400.00
2399.99
2385.41
2359.03
2202.91
2192.95
2192.94
PROPOSAL LISTING Page 2
Your ref : lA Version #10
Last revised : 25-0ct-1999
Vert Ellipse Semi Axes Minor
Sect Major Minor Vert. Azi.
E 3251.02 132.30 65.87 50.40 349.34
E 3309.88 134.31 66.20 50.99 350.01
E 3409.82 137.78 66.84 52.00 351.22
E 3509.62 141.32 67.56 53.00 352.49
E 3527.54 141.97 67.69 53.18 352.72
E 3829.13 153.21 69.63 56.25 356.11
E 3907.73 156.26 70.15 57.05 356.97
E 4006.49 160.20 70.90 58.07 358.13
E 4073.23 162.94 71.45 58.77 358.95
E 4073.26 162.95 71.45 58.77 358.95
E 4104.39 164.24 71.70 59.09 359.32
E 4160.70 166.61 72.13 59.68 359.96
E 4494.05 181.13 74.44 63.20 3.37
E 4515.31 182.09 74.57 63.42 3.57
E 4515.33 182.09 74.57 63.42 3.57
POSITION UNCERTAINTY SUMMARY
Depth Position Uncertainty
From To Survey Tool Error Model Major Minor Vert.
0 6498 ARCO (H.A. Gyro) User specified 65.44 26.96 21.62
6498 12022 ARCO (H.A. Mag) User specified 182.09 74.57 63.42
1. Ellipse dimensions are half axis.
2. Casing dimensions are not included.
3. E11 ipses are cal cul ated on 2.58 standard deviations.
4. Uncertainty calculations start at drill depth zero.
5. Surface position uncertainty is not included.
6. Where two surveys are tied together the errors of one are considered
to have a systematic relationship to the corresponding errors of the other.
7. Detailed description of the INTEQ error models can be found
in the Ec*Trak manual.
All data is in feet unless otherwise stated.
Coordinates from slot #lA and TVD from rkb Pool ~5 (80.00 Ft above mean sea level).
Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead.
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R,1A
Kuparuk River Unit,North Slope. Alaska
PROPOSAL LISTING Page 3
Your ref : lA Version #10
Last revised : 25-0ct-1999
Comments in wellpath
MD TVD Rectangul ar Coords. Comment
6776.72
7212.23
7310.99
7335.60
7371.39
7701.71
7760.28
8114.16
8114.18
8366.62
8366.66
8366.68
8489.20
8567.11
8567.13
8816.65
9171.13
9285.55
9285.57
10207.59
10207.61
10306.26
10741.07
11017.99
11320.90
11568.11
11657.75
12021.82
12021.84
5568.07
5987.00
6082.00
6105.67
6140 O0
6427 O0
6468 O0
6615 O0
6615 O0
6650 O0
6650 O0
6650 O0
6659 16
6660 O0
6660 O0
6666 87
6682 48
6685 O0
6685 O0
6685 O0
6685 O0
6682 45
6660 O0
6654 43
6657 90
6655 O0
6649 77
6620 O0
6620 O0
977.78 S 2898.10 E EOC
1012.25 S 3012.03 E C30
1020.06 S 3037.86 E C20
1022.01 S 3044.30 E Begin Build & Turn
1025.95 S 3053.59 E B/HRZ - T/Kalubik
1161.64 S 3126.72 E Top C
1202.33 S 3136.23 E Top B Shale
1516.93 S 3162.93 E Target #1 Top A4-1ROiA
1516.95 S 3162.93 E Target #1-Top A4/EOC
1766.95 S 3161.60 E Top A3
1766.96 S 3161.60 E Target#2 Top A3-1ROIA
1766.98 S 3161.60 E Target#2-Top A3/Begin Build
1889.07 S 3160.95 EEOC
1966.97 S 3160.54 E Target #3-A3 Tgt2 1ROiA
1966.99 S 3160.54 E Target#3-A3 t2/Begin Drop & Turn
2213.45 S 3127.09 E EOC
2555.26 S 3034.47 E Begin Build & Turn
2666.23 S 3006.81 E Target#4A3-Tgt3 1RO1A
2666.26 S 3006.81 E TargetS-A3 t3/EOC
3565.25 S 2802.02 E TargetS5 A4-Tgt2 1ROiA
3565.27 S 2802.01 E Target#5-A4 t2/Begin Build
3661.41 S 2780.11 E EOC
4084.79 S 2683.66 E Target~6-A3 UpThrn/Begin Drop&Turn
4349.92 S 2604.74 E EOC
4633.96 S 2499.58 E Begin Build&Turn
4860.02 S 2399.99 E Target #7-A3 UpThrn t2/Begin Build
4939.58 S 2359.03 EEOC
5262.19 S 2192.95 E Target#8-TD/Casing Pt
5262.21S 2192.94 E Target ~8 A4-Toe 1ROIA
Casing positions in string 'A'
Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing
n/a 5328.57 939.61S 2766.39E 6498.00 5328.57 939.61S 2766.39E 7" Window
n/a 5328.57 939.61S 2766.39E 12021.80 6620.00 5262.17S 2192.96E 3 1/2" Liner
Targets associated with this wellpath
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
Target#7A3-UpThrnT 542200.000~5986200.000,0.0000
Target#6 A3-UpThrn 542550.000.5987000.000,0.0000
Target #1 Top A4-1RO 543000.000.5989550.000,0.0000
Target#2 Top A3-1RO 543000.000 5989300.000,0.0000
Target#3-A3 Tgt2 1R 543000.000~5989100.000,0.0000
TargetS4 A3-Tgt3 1R 542850.000.5988400.000,0.0000
Target~S A4-Tgt2 1R 542650.000 5987500.000,0.0000
Target~t~ A4-Toe 1RO 542050.000 5985800.000,0.0000
6655.00
6660.00
6615.00
6650.00
6660.00
6685.00
6685.00
6620.00
4862.97S
4064 76S
1516 93S
1766 96S
1966 97S
2666 23S
3565 25S
5262.21S
2345.08E 20-Sep-1999
2699.36E 20-Sep-1999
3162.93E 9-Jun-1999
3161.60E 20-Sep-1999
3160.54E 20-Sep-1999
3006.81E 20-Sep-1999
2802.02E 20-Sep-1999
2192.94E 20-Sep-1999
ARCO Alaska, Inc.
Pad 1R,1A
Kuparuk River Unit,North Slope, Alaska
PROPOSAL LISTING Page 1
Your ref : lA Version #10
Last revised : 23-0ct-1999
Measured Inclin Azimuth True Vert R E C TAN G U L A R Dogleg Vert G R I D C 0 0 R D S
Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect Easting Northing
6498.00 43.73 105.90 5328,57 939.61S 2766.39E 0,00 191.60
6498.02 43,73 105,90 5328.58 939.61S 2766,40E 10.00 191.60
6500.00 43.53 105.90 5330.02 939.99S 2767.71E 10.00 191.62
6600.00 33.53 106.07 5408.15 957.11S 2827.52E 10.00 192.68
6700.00 23.53 106.37 5495.89 970.42S 2873.33E 10,00 193.68
542600.44 5990125.16
542600.45 5990125.15
542601.77 5990124.79
542661.66 5990107.98
542707.54 5990094.92
6776.72 15.86 106.83 5568.07 977.78S 2898.10E 10.00 194.38
7000.00 15.86 106.83 5782.85 995.45S 2956.51E 0.00 196.33
7212.23 15.86 106,83 5987.00 1012.25S 3012.03E 0.00 198.18
7310.99 15.86 106.83 6082.00 1020.06S 3037.86E 0.00 199.05
7335.60 15.86 106.83 6105.67 1022,01S 3044.30E 0.00 199.26
542732.34 5990087.69
542790.84 5990070.33
542846.44 5990053.83
542872.31 5990046.15
542878.76 5990044.24
7371.39 17,06 118.75 6140.00 1025.95S 3053.59E 10.00 200.67 542888.06 5990040.35
7400.00 18.46 126.95 6167.25 1030,69S 3060.89E 10.00 203.36 542895.39 5990035.64
7500.00 25.29 146.88 6260.12 1058.17S 3085.27E 10.00 223.59 542919.92 5990008.30
7600.00 33.66 158.10 6347.17 1101.89S 3107.34E 10.00 260.10 542942.22 5989964.71
7700.00 42.68 165.14 6425.74 1160.51S 3126,42E 10.00 311.79 542961.60 5989906.19
7701.71 42.84 165.24 6427.00 1161.64S 3126.72E 10.00 312.80 542961.91 5989905.06
7760.28 48.27 168.30 6468.00 1202.33S 3136,23E 10.00 349.65 542971.63 5989864.43
7800.00 52.00 170,09 6493.45 1232.27S 3141.93E 10,00 377.09 542977.49 5989834.52
7900.00 61.48 173.91 6548,25 1314.98S 3153.40E 10.00 454.01 542989.40 5989751.88
8000.00 71.05 177,09 6588,46 1406.12S 3160.48E 10.00 540.22 542996.96 5989660.79
8100.00 80.67 179.92 6612.87 1502.94S 3162.96E 10.00 633,09 542999,95 5989564.00
8114.16 82.03 180.30 6615.00 1516.93S 3162.93E 10.00 646.62 543000.00 5989550.00
8114.18 82,03 180.30 6615.00 1516.95S 3162.93E 0.00 646.64 543000.00 5989549.98
8134,66 82.03 180.30 6617.84 1537.24S 3162.82E 0.00 666.26 543000.00 5989529.70
8234.66 82.03 180.30 6631,71 1636,27S 3162.30E 0.00 762.06 543000.00 5989430.67
8334.66 82.03 180.30 6645,57 1735.31S 3161.77E 0.00 857.85 543000.00 5989331.65
8366.62 82.03 180.30 6650.00 1766.95S 3161.60E 0.00 888.46 543000.00 5989300.00
8366.66 82.03 180.30 6650.00 1766.96S 3161.60E 0,00 888.47 543000.00 5989300.00
8366.68 82.03 180.30 6650.00 1766.98S 3161.60E 6.00 888.49 543000.00 5989299.98
8399.45 84.00 180.30 6653.99 1799.50S 3161,43E 6.00 919.95 543000.00 5989267.45
8489.20 89.38 180,30 6659.16 1889.07S 3160.95E 6.00 1006.58 543000.00 5989177.90
8500.00 89.38 180.30 6659.28 1899.87S 3160.90E 0.00 1017,03 543000.00 5989167.10
8567.11 89.38 180.30 6660.00 1966.97S 3160.54E 0.00 1081.94 543000.00 5989100.00
8567.13 89.38 180.31 6660.00 1966.99S 3160.54E 6.00 1081.96 543000.00 5989099.98
8600.00 89.13 182.26 6660,43 1999.85S 3159.80E 6.00 1113.89 542999.44 5989067.12
8700.00 88.36 188.21 6662.62 2099.36S 3150.68E 6.00 1212.37 542990.85 5988967.57
8800.00 87.60 194.17 6666.16 2197.36S 3131.30E 6.00 1312.04 542971.99 5988869.49
8816.65 87.48 195.16 6666.87 2213.45S 3127.09E 6.00 1328.67 542967.86 5988853.38
9000.00 87.48 195,16 6674.95 2390.25S 3079,18E 0.00 1511.85 542920.90 5988676.34
9171.13 87.48 195,16 6682.48 2555.26S 3034.47E 0.00 1682,81 542877.07 5988511.11
9200.00 88.11 194.57 6683.59 2583.14S 3027.07E 3.00 1711.66 542869.82 5988483.19
9285,55 90.00 192.83 6685.00 2666.23S 3006.81E 3.00 1797.17 542850.00 5988400.00
9285.57 90.00 192.83 6685.00 2666.26S 3006.81E 0.93 1797.19 542849.99 5988399.98
9500.00 90.00 192.83 6685.00 2875.33S 2959.18E 0.00 2011.47 542803.48 5988190.67
10000.00 90,00 192.83 6685.00 3362.84S 2848.13E 0,00 2511.11 542695.03 5987702.63
10207.59 90.00 192.83 6685.00 3565.25S 2802.02E 0.00 2718.55 542650.00 5987500.00
10207.61 90.00 192.83 6685.00 3565.27S 2802.01E 3.00 2718.57 542650.00 5987499.98
10306,26 92.96 192.83 6682.45 3661.41S 2780.11E 3.00 2817.10 542628.61 5987403.74
10500.00 92.96 192.83 6672.45 3850.06S 2737.14E 0,00 3010.45 542586.64 5987214.88
10741.05 92.96 192.83 6660,00 4084.77S 2683.67E 0.00 3251,00 542534.42 5986979.91
All data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from slot #lA and TVD from rkb Pool ~6 (80.00 Ft above mean sea level).
Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead.
Total Dogleg for wellpath is 152,86 degrees.
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hugh~s INTEQ
ARCO Alaska, Inc.
Pad 1R,1A
Kuparuk River Unit,North Slope, Alaska
PROPOSAL LISTING Page 2
Your ref : lA Version #10
Last revised : 23-0ct-1999
Measured Inclin Azimuth True Vert R E C TAN G U L A R Dogleg Vert G R I D C 0 0 R D S
Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect Easting Northing
10741.07 92.96 192.83 6660.00 4084.79S 2683.66E 3.00 3251.02 542534.42 5986979.89
10800.00 92.19 194.43 6657.35 4142.00S 2669.79E 3.00 3309.88 542520.85 5986922.61
10900.00 90.89 197.13 6654.66 4238.19S 2642.61E 3.00 3409.82 542494.18 5986826.29
11000.00 89.58 199.83 6654.26 4333.02S 2610.92E 3.00 3509.62 542463.00 5986731.30
11017.99 89.34 200.32 6654.43 4349.92S 2604.74E 3.00 3527.54 542456.91 5986714.37
11320.90 89.34 200.32 6657.90 4633.96S 2499.58E 0.00 3829.13
11400.00 90.19 202.53 6658.22 4707.60S 2470.69E 3.00 3907.73
11500.00 91.27 205.33 6656.94 4798.98S 2430.14E 3.00 4006.49
11568.09 92.00 207.24 6655.00 4860.00S 2400.00E 3.00 4073.23
11568.11 92.00 207.24 6655.00 4860.02S 2399.99E 3.00 4073.26
11600.00 92.96 207.24 6653.62 4888.35S 2385.41E 3.00 4104.39
11657.75 94.69 207.24 6649.77 4939.58S 2359.03E 3.00 4160.70
12000.00 94.69 207.24 6621.79 5242.85S 2202.91E 0.00 4494.05
12021.82 94.69 207.24 6620.00 5262.19S 2192.95E 0.00 4515.31
12021.84 94.69 207.24 6620.00 5262.21S 2192.94E 0.00 4515.33
542353.27 5986429.80
542324.78 5986356.02
542284.71 5986264.43
542254.90 5986203.26
542254.89 5986203.24
542240.46 5986174.84
542214.36 5986123.48
542059.86 5985819.40
542050.01 5985800.02
542050.00 5985800.00
All data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from slot #lA and TVD from rkb Pool #6 (80.00 Ft above mean sea level).
Bottom hole distance is 5700.86 on azimuth 157.38 degrees from wellhead.
Total Dogleg for wellpath is 152.86 degrees.
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hugh~s INTEQ
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit. North Slope, Alaska
PROPOSAL LISTING Page 3
Your ref : lA Version #10
Last revised : 23-0ct-1999
Comments in wellpath
MD TVD Rectangular Coords. Comment
6498.02 5328.58 939
6776.72 5568.07 977
7212.23 5987.00 1012
7310.99 6082.00 1020
7335.60 6105.67 1022
7371.39 6140.00 1025
7701.71 6427.00 1161
7760.28 6468.00 1202
8114.16 6615.00 1516
8114.18 6615.00 1516
8366.62 6650.00 1766
8366.66 6650.00 1766
8366.68 6650.00 1766
8489.20 6659.16 1889
8567.11 6660.00 1966
8567.13 6660.00 1966
8816.65 6666.87 2213
9171.13 6682.48 2555
9285.55 6685.00 2666
9285.57 6685.00 2666
10207.59 6685.00 3565
10207.61 6685.00 3565
10306.26 6682.45 3661
10741.07 6660.00 4084
11017.99 6654.43 4349
11320.90 6657.90 4633
11568.11 6655.00 4860
11657.75 6649.77 4939
12021.82 6620.00 5262
12021.84 6620.00 5262
.61S 2766.40E Sidetrack Point
.78S 2898.10E EOC
.25S 3012.03E C30
.06S 3037.86E C20
.01S 3044.30E Begin Build & Turn
.95S 3053.59E B/HRZ - T/Kalubik
.64S 3126.72E Top C
.33S 3136.23E Top B Shale
93S 3162.93E Target #1 Top A4-1ROIA
95S 3162.93E Target #1-Top A4/EOC
95S 3161.60E Top A3
96S 3161.60E Target#2 Top A3-1ROiA
98S 3161.60E Target#2-Top A3/Begin Build
07S 3160.95E EOC
97S 3160.54E Target #3-A3 Tgt2 1RO1A
99S 3160.54E Target#3-A3 t2/Begin Drop & Turn
45S 3127.09E EOC
26S 3034.47E Begin Build & Turn
23S 3006.81E Target#4A3-Tgt3 1RO1A
26S 3006.81E Target ~4-A3 t3/EOC
25S 2802.02E Target~5A4-Tgt2 1RO1A
27S 2802.01E Target #5-A4 t2/Begin Build
.41S 2780.11E EOC
79S 2683.66E Target~6-A3 UpThrn/Begin Drop&Turn
92S 2604.74E EOC
96S 2499.58E Begin Build&Turn
02S 2399.99E Target #7-A3 UpThrn t2/Begin Build
58S 2359.03E EOC
19S 2192.95E Target#8-TD/Casing Pt
21S 2192.94E Target#8A4-Toe 1ROiA
Casing positions in string 'A'
Top MD Top TVD Rectangular Coords. Bot MD BotTVD Rectangular Coords. Casing
n/a 5328.57 939.61S 2766,39E 6498.00 5328.57 939.61S 2766.39E 7" Window
n/a 5328.57 939.61S 2766.39E 12021.80 6620.00 5262.17S 2192.96E 3 1/2" Liner
Targets associated with this wellpath
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
Target #7 A3-UpThrnT 542200 000 5986200.000,0.0000
Target~15 A3-UpThrn 542550 000 5987000.000,0.0000
Target #1 Top A4-1RO 543000 000 5989550.000,0.0000
Target#2 Top A3-1RO 543000 000 5989300.000,0.0000
Target#3-A3 Tgt2 1R 543000 000 5989100.000,0.0000
Target ~4 A3-Tgt3 1R 542850 000 5988400.000,0.0000
Target ~qS A4-Tgt2 1R 542650 000 5987500.000.0.0000
Targeted8 A4-Toe 1RO 542050 000 5985800.000,0.0000
6655.00
6660.00
6615.00
6650.00
6660.00
6685.00
6685.00
6620.00
4862 97S
4064 76S
1516 93S
1766 96S
1966 97S
2666 23S
3565 25S
5262.21S
2345.08E 20-Sep-1999
2699.36E 20-Sep-1999
3162.93E 9-Jun-1999
3161.60E 20-Sep-1999
3160.54E 20-Sep-1999
3006.81E 20-Sep-1999
2802.02E 20-Sep-1999
2192.94E 20-Sep-1999
ARCO Alaska, Inc.
Pad 1R
lA
slot #lA
Kuparuk River Unit
North Slope, A1 aska
3-D
MINIMUM DISTANCE CLEARANCE REPORT
INCLUDING POSITION UNCERTAINTIES
by
Baker Hughes INTEQ
Your ref : lA Version #10
Our ref : prop3679
License :
Date printed : 23-0ct-1999
Date created : 22-0ct-1999
Last revised : 23-0ct-1999
Field is centred on n70 16 18.576,w150 5 56,536
Structure is centred on n70 23 12.884,w149 40 37.889
Slot location is n70 23 11.369,w149 40 33.820
Slot Grid coordinates are N 5991049.979, E 539829.377
Slot local coordinates are 154.00 S 139.00 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
Report is limited to clearances less than 2000 feet
Proximities will incorporate ellipses - when survey tools are defined for both wells.
Ellipse separation in reverse brackets, e.g. )10.2(, where available
DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4*
Object wellpath
PMSS <0-6755'>,,17,Pad 1G
MMS <6350 - 7760'>,,10A,Pad 1G
PMSS <6390 - 7906'>,,10A,Pad 1G
PGMS <0-7970'>,,lO,Pad 1G
PGMS <0-9225'>,,16,Pad 1G
GMS <0-7415'>,,4,Pad 1G
GMS <0-8489'>,,3,Pad 1G
GMS <0-10086'>,,5,Pad 1G
PMSS <2156-2674'>,,6,Pad 1G
GMS <0-9250'>,,6A,Pad 1G
PGMS <0-8851'>,,7,Pad 1G
PGMS <O-8715'>,,8A,Pad 1G
PMSS <2232-3720'>,,8,Pad 1G
PGMS <0-8360'>,,9,Pad 1G
PGMS <0-8208'>,,11,Pad 1G
PGMS <O-9116'>,,12,Pad 1G
PGMS <0-8110'>,,13,Pad 1G
PGMS <0-7950'>,,14,Pad 1G
PGMS <0-7533'>,,15,Pad 1G
Closest approach with 3-
Last revised
lO-Aug-1999
2-Feb-1999
8-Sep-1996
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
11-Dec-1992
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
Distance
)6173.5(
)4148 6(
)4146 1(
)3830 6(
)5541 5(
)3980 O(
)5969 8(
)6641 1(
)6391 6(
)6436 4(
)1637 8(
)3655 3(
)4923 1(
)1322 9(
)6128 3(
)6916 9(
)7460 6(
)5921 4(
)5O55 O(
D Minimum Distance method
M.D. Diverging from M.D.
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021,8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
12021.8 12021.8
MSS <1651-2529'> ,2, 1G GMS <0-9754'>, 2A, Pact- 1G
GMS <0-7970'>, 1, Pad
PGMS <0 - 10180'>
PGMS <0-7530'>
PGMS <0-9310'>
PGMS <0-8440 '>
PGMS <0-8775'>
PGMS <0-9303'>
PGMS <0- 7182'>
PGMS <0-8570'>
PGMS <0-8225'>
PGMS <0-8800 >
PGMS <0-7295 >
PGMS <0-8570 >
PGMS <0-9250 >
PGMS <0-7420 >
PGMS <0-8450 >
PMSS <0:5350 >
PGMS <0-10215'>
21,Pad 1R
3,Pad 1R
2,Pad 1R
4 Pad 1R
5 Pad 1R
6 Pad 1R
7 Pad 1R
8 Pad 1R
9 Pad 1R
10 Pad 1R
11'Pad 1R
13 Pad 1R
14 Pad 1R
15 Pad 1R
16 Pad 1R
,18 Pad 1R
,,26,Pad 1R
PMSS <6970 - 12972'>,,24,Pad 1R
PGMS <O-12180'>,,23,Pad 1R
PGMS <0-10080'>,,20,Pad 1R
PGMS <0-9838'>,,19,Pad 1R
PGMS <0-11368'>,,29,Pad 1R
PGMS <0-12388'>,,27,Pad 1R
PGMS <0-10345'>,,17,Pad 1R
PGMS <0-10295'>,,25,Pad 1R
PGMS <0-8320'>,,12,Pad 1R
PGMS <0-3991'>,,U SWPT1,Pad 1R
PMSS <473-11428'>,,32,Pad 1R
PMSS <O-15530'>,,33,Pad 1R
PMSS <741-13570'>,,34,Pad 1R
PMSS <645-12647'>,,31,Pad 1R
MSS <0-9775'>,,E UGNU #1,Pad 1R
PGMS <0-8570'>,,1,Pad 1R
PGMS <0-10810'>,,22,Pad 1R
PGMS<O-8568'>Depth Shifted,,1A,Pad 1R
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
lO-Apr-1991
2-Feb-1999
2-Feb-1999
22-0ct-1999
)69~5
)6954
)5660
)4675
) 1759 6 (
)996 2(
)1175 5(
)3623 4(
)4570.0 (
)3762.3(
)4032.6(
)4340.4(
)5105.1(
)3411.0(
)3476.8(
)3504.0(
) 2808.1(
)1818.8(
)5136.9(
)1259.0(
)2314.1(
) 3873.1(
)4445.9(
)4783.7(
)1847.9(
)1850.3(
)5375.1(
)1976.2(
)4124.3(
)10102.9
)5120.5(
) 5028.1(
)4734.5(
)5186.2(
)5914.5(
)0.0(
)3357.4(
)0.0(
4( 12021.
2( 12021 ~
8( 12021 8
6( 6498 0
8031 3
9528 0
11148 0
12021 8
6498 0
6498 0
6498 0
6498 0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6757.5
6498.0
6757.5
12021.8
12021.8
12021.8
6498.0
8366.7
9528.0
11148.0
12021.8
12021.8
9087.0
10677.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
9936.0
7038.0
11253.0
9909.0
9297.0
6498.0
6498.0
6498.0
6498.0
6498.0
9147.0
6498.0
6498.0
11031.0
6498.0
6757.5
12015.0
6757.5
ARCO Alaska, Inc.
Pad iR, lA
Kuparuk River Unit,North Slope, Alaska
CLEARANCE LISTING Page 2
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference wellpath
Object wellpath : PGMS <0-8851'>,,7,Pad 1G
M.D. T.V.D.
Hori z Mi n'm E11 i pse
Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
11200.0
11300.0
11400.0
11500.0
11600.0
6656.5
6657.7
6658.2
6656.9
6653.6
4520.6S 2541.6E 8299.9 6635.8 6463.8S 3975.6E 143.6 2415.1 )1981.8(
4614.4S 2506.8E 8250.9 6601.6 6484.5S 3947.4E 142.4 2361.3 )1925.4(
4707.6S 2470.7E 8187.9 6557.4 6511.0S 3911.2E 141.4 2310.3 )1873.0(
4799.0S 2430.1E 8122.8 6511.3 6538.1S 3874.0E 140.3 2265.0 )1826.1(
4888.3S 2385.4E 8052.4 6461.1 6567.0S 3833.9E 139.2 2225.6 )1785.3(
11700.0
11800.0
11900.0
12000.0
6646.3
6638.1
6630.0
6621.8
4977.0S 2339.8E 7970.1 6401.9 6599.9S 3787.3E 138.3 2188.3 )1748.0(
5065.6S 2294.1E 7899.3 6350.4 6627.7S 3747.3E 137.1 2152.8 )1711.5(
5154.2S 2248.5E 7835.8 6303.8 6652.1S 3711.8E 135.7 2119.2 )1676.4(
5242.9S 2202.9E 7776.9 6260.0 6674.5S 3679.3E 134.1 2088.1 )1643.5(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #lA and la~D from rkb Pool #6 (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit,North Slope, Alaska
CLEARANCE LISTING Page 3
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference wellpath
Object wellpath : PGMS <0-8360'>,,9,Pad 1G
M.D. T.V.D.
Rect Coordinates
Horiz Min'm Ellipse
M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
11400.0 6658.2
11500.0 6656.9
11600.0 6653.6
11700.0 6646.3
11800.0 6638.1
4707.6S
4799.0S
4888.3S
4977.0S
5065.6S
2470.7E 8360.0 6935.5
2430.1E 8360.0 6935.5
2385.4E 8360.0 6935.5
2339.8E 8360.0 6935.5
2294.1E 8360.0 6935.5
6269.2S 925.2E 224.7 2214.6 )1918.0(
6269.2S 925.2E 225.7 2122.3 )1821.1(
6269.2S 925.2E 226.6 2029.4 )1723.9(
6269.2S 925.2E 227.6 1937.7 )1627.7(
6269.2S 925.2E 228.7 1846.9 )1532.3(
11900.0 6630.0
12000.0 6621.8
5154.2S 2248.5E 8360.0 6935.5 6269.2S
5242.9S 2202.9E 8360.0 6935.5 6269.2S
925.2E 229.9 1757.2 )1437.4(
925.2E 231.2 1668.7 )1343.2(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #lA and TVD from rkb Pool ~ (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
M.D.
6500.0
6600.0
6700.0
6800.0
6900.0
7000.0
7100.0
7200.0
7300.0
7400.0
7500.0
7600.0
7700.0
7800.0
7900.0
8000.0
8100.0
8200.0
8300.0
8400.0
8500.0
8600.0
8700.0
88OO.0
8900.0
9000.0
9100.0
9200.0
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit. North Slope, Alaska
CLEARANCE LISTING Page 4
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference wellpath
Object wellpath : PGMS <0-7530'>,,3,Pad 1R
Horiz Min'm Ellipse
T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
5330.0 940.0S 2767.7E 6864.2 6385.2 1132.1S 1012.9E 263.8 2056.7 )1987.0(
5408.1 957.1S 2827.5E 6956.6 6453.9 1173.9S 1058.6E 263.0 2066.3 )1994.8(
5495.9 970.4S 2873.3E 7047.0 6521.0 1214.7S 1103.2E 262.1 2060.1 )1986.7(
5590.5 979.6S 2904.2E 7126.5 6580.4 1250.4S 1142.2E 261.3 2039.1 )1963.8(
5686.7 987.5S 2930.3E 7212.3 6644.6 1288.9S 1184.1E 260.2 2014.4 )1937.1(
5782.8 995.5S 2956.5E 7296.8 6707.8 1326.9S 1225.3E 259.2 1990.6 )1911.2(
5879.0 1003.4S 2982.7E 7380.3 6770.5 1364.5S 1265.8E 258.1 1967.9 )1886.4(
5975.2 1011.3S 3008.8E 7467.9 6836.3 1403.7S 1308.2E 257.0 1946.2 )1862.4(
6071.4 1019.2S 3035.0E 7530.0 6883.0 1431.6S 1338.3E 256.3 1925.5 )1839.8(
6167.3 1030.7S 3060.9E 7530.0 6883.0 1431.6S 1338.3E 256.9 1908.0 )1821.2(
6260.1 1058.2S 3085.3E 7530.0 6883.0 1431.6S 1338.3E 257.9 1891.9 )1804.4(
6347.2 1101.9S 3107.3E 7530.0 6883.0 1431.6S 1338.3E 259.4 1877.6 )1789.7(
6425.7 1160.5S 3126.4E 7530.0 6883.0 1431.6S 1338.3E 261.4 1865.5 )1777.6(
6493.5 1232.3S 3141.9E 7530.0 6883.0 1431.6S 1338.3E 263.7 1856.0 )1768.5(
6548.2 1315.0S 3153.4E 7530.0 6883.0 1431.6S 1338.3E 266.3 1849.4 )1762.5(
6588.5 1406.1S 3160.5E 7530.0 6883.0 1431.6S 1338.3E 269.2 1846.0 )1759.8(
6612.9 1502.9S 3163.0E 7530.0 6883.0 1431.6S 1338.3E 272.2 1846.0 )1760.4(
6626.9 1601.9S 3162.5E 7530.0 6883.0 1431.6S 1338.3E 275.3 1850.0 )1765.0(
6640.8 1701.0S 3162.0E 7530.0 6883.0 1431.6S 1338.3E 278.4 1859.3 )1774.9(
6654.0 1800.0S 3161.4E 7530.0 6883.0 1431.6S 1338.3E 281.4 1874.1 )1790.0(
6659.3 1899.9S 3160.9E 7530.0 6883.0 1431.6S 1338.3E 284.4 1895.1 )1811.1(
6660.4 1999.8S 3159.8E 7530.0 6883.0 1431.6S 1338.3E 287.3 1921.1 )1837.1(
6662.6 2099.4S 3150.7E 7530.0 6883.0 1431.6S 1338.3E 290.2 1944.1 )1859.9(
6666.2 2197.4S 3131.3E 7530.0 6883.0 1431.6S 1338.3E 293.1 1961.7 )1877.2(
6670.5 2293.8S 3105.3E 7530.0 6883.0 1431.6S 1338.3E ~96.0 1977.6 )1892.5(
6674.9 2390.2S 3079.2E 7530.0 6883.0 1431.6S 1338.3E 298.8 1998.3 )1912.3(
6679.3 2486.7S 3053.1E 7530.0 6883.0 1431.6S 1338.3E 301.6 2023.7 )1936.6(
6683.6 2583.1S 3027.1E 7530.0 6883.0 1431.6S 1338.3E 304.3 2053.8 )1965.4(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #lA and TVD from rkb Pool ~15 (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska. Inc.
Pad 1R. lA
Kuparuk Ri ver Unit. North S1 ope. A1 aska
CLEARANCE LISTING Page 5
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference wel 1 path
Object wellpath : PGMS <0-9310'>,.2.Pad 1R
M.D. T.V.D.
Rect Coordinates
M.D. T.V.D.
Hori z Mi n' m E11 i pse
Rect Coordi nates Bearing Di st Sep' n
6500.0 5330.0
6600.0. 5408.1
6700.0 5495.9
6800.0 5590.5
6900.0 5686.7
940.0S 2767.7E 5951.3 4623.6 1861.8S 2727.3E 182.5 1162.1 )1060.0(
957.1S 2827.5E 6049.9 4688.1 1913.4S 2781.0E 182.8 1198.0 )1093.4(
970.4S 2873.3E 6141.8 4748.7 1961.4S 2830.9E 182.5 1241.8 )1135.9(
979.6S 2904.2E 6229.7 4806.8 2007.0S 2878.4E 181.4 1292.4 )1186.2(
987.5S 2930.3E 6316.7 4864.6 2052.1S 2925.2E 180.3 1345.0 )1238.6(
7000.0 5782.8 995.5S 2956.5E 6405.7 4924.0 2098.0S 2973.0E 179.1 1397.7 )1291.0(
7100.0 5879.0 1003.4S 2982.7E 6497.6 4985.7 2145.1S 3022.3E 178.0 1450.3 )1343.1(
7200.0 5975.2 1011.3S 3008.8E 6585.0 5044.6 2189.5S 3069.1E 177.1 1502.6 )1395.2(
7300.0 6071.4 1019.2S 3035.0E 6662.7 5097.1 2228.9S 3110.6E 176.4 1555.1 )1447.5(
7400.0 6167.3 1030.7S 3060.9E 6737.4 5147.4 2267.2S 3150.4E 175.9 1605.3 )1497.8(
7500.0 6260.1 1058.2S 3085.3E 6797.9 5187.7 2299.2S 3182.3E 175.5 1643.1 )1536.4(
7600.0 6347.2 1101.9S 3107.3E 6865.3 5232.1 2335.6S 3217.7E 174.9 1666.6 )1561.1(
7700.0 6425.7 1160.5S 3126.4E 6953.6 5289.6 2383.7S 3264.2E 173.6 1675.1 )1570.5(
7800.0 6493.5 1232.3S 3141.9E 7048.1 5351.3 2435.3S 3313.9E 171.9 1667.8 )1564.3(
7900.0 6548.2 1315.0S 3153.4E 7131.9 5406.0 2481.0S 3357.9E 170.1 1645.1 )1543.2(
8000.0 6588.5 1406.1S 3160.5E 7200.6 5450.5 2518.7S 3394.2E 168.1 1608.5 )1509.0(
8100.0 6612.9 1502.9S 3163.0E 7272.7 5497.2 2558.4S 3432.2E 165.7 1559.3 )1462.1(
8200.0 6626.9 1601.9S 3162.5E 7336.0 5538.3 2593.4S 3465.4E 163.0 1503.3 )1408.9(
8300.0 6640.8 1701.0S 3162.0E 7397.7 5578.3 2627.5S 3497.7E 160.1 1449.2 )1357.6(
8400.0 6654.0 1800.0S 3161.4E 7460.2 5618.8 2662.2S 3530.4E 156.8 1396.8 )1308.1(
8500.0 6659.3 1899.9S 3160.9E 7517.4 5655.8 2693.8S 3560.3E 153.3 1340.5 )1254.5(
8600.0 6660.4 1999.8S 3159.8E 7572.9 5691.7 2724.5S 3589.4E 149.3 1283.8 )1200.4(
8700.0 6662.6 2099.4S 3150.7E 7625.3 5725.5 2753.5S 3616.9E 144.5 1234.3 )1153.1(
8800.0 6666.2 2197.4S 3131.3E 7674.7 5757.6 2780.8S 3642.9E 138.8 1194.8 )1115.1(
8900.0 6670.5 2293.8S 3105.3E 7720.2 5787.1 2805.8S 3666.7E 132.4 1165.2 )1085.5(
9000.0 6674.9 2390.2S 3079.2E 7765.4 5816.6 2830.5S 3690.4E 125.8 1142.0 )1060.5(
9100.0 6679.3 2486.7S 3053.1E 7808.9 5845.1 2854.3S 3713.3E 119.1 1125.6 )1040.1(
9200.0 6683.6 2583.1S 3027.1E 7851.3 5872.8 2877.5S 3735.4E 112.6 1116.1 )1024.5(
9300.0 6685.0 2680.3S 3003.6E 7893.3 5900.3 2900.4S 3757.3E 106.3 1110.1 )1010.6(
9400.0 6685.0 2777.8S 2981.4E 7937.2 5929.1 2924.6S 3780.1E 100.4 1109.5 )1000.4(
9500.0 6685.0 2875.3S 2959.2E 7982.8 5959.0 2949.6S 3803.7E 95.0 1116.2 )996.3(
9600.0 6685.0 2972.8S 2937.0E 8028.9 5989.3 2975.1S 3827.4E 90.1 1130.0 )998.6(
9700.0 6685.0 3070.3S 2914.8E 8075.2 6019.8 3000.5S 3851.1E 85.7 1150.7 )1007.5(
9800.0 6685.0 3167.8S 2892.5E 8119.8 6049.4 3025.0S 3873.9E 81.7 1177.9 )1023.0(
9900.0 6685.0 3265.3S 2870.3E 8162.6 6077.8 3048.3S 3895.7E 78.0 1211.2 )1045.3(
10000.0 6685.0 3362.8S 2848.1E 8205.4 6106.4 3071.6S 3917.5E 74.8 1250.3 )1074.0(
10100.0 6685.0 3460.3S 2825.9E 8248.1 6134.9 3094.7S 3939.2E 71.8 1294.5 )1108.7(
10200.0 6685.0 3557.8S 2803.7E 8289.2 6162.6 3116.8S 3960.1E 69.1 1343.4 )1149.0(
10300.0 6682.8 3655.3S 2781.5E 8330.2 6190.3 3138.7S 3981.0E 66.7 1395.8 )1193.5(
10400.0 6677.6 3752.7S 2759.3E 8369.6 6217.0 3159.7S 4000.9E 64.5 1451.0 )1241.8(
10500.0 6672.4 3850.1S 2737.1E 8407.3 6242.6 3179.7S 4020.0E 62.4 1509.9 )1294.5(
10600.0 6667.3 3947.4S 2715.0E 8444.0 6267.7 3199.1S 4038.5E 60.5 1572.1 )1351.3(
10700.0 6662.1 4044.8S 2692.8E 8479.7 6292.1 3217.9S 4056.5E 58.8 1637.2 )1411.8(
10800.0 6657.4 4142.0S 2669.8E 8515.4 6316.6 3236.6S 4074.5E 57.2 1705.6 )1476.0(
10900.0 6654.7 4238.2S 2642.6E 8550.3 6340.5 3254.9S 4092.1E 55.8 1779.5 )1546.4(
11000.0 6654.3 4333.0S 2610.9E 8583.7 6363.5 3272.4S 4109.0E 54.7 1858.4 )1622.3(
11100.0 6655.4 4426.8S 2576.3E 8617.7 6386.8 3290.2S 4126.1E 53.7 1940.6 )1701.8(
11200.0 6656.5 4520.6S 2541.6E 8650.2 6409.1 3307.3S 4142.5E 52.8 2024.0 )1782.8(
11300.0 6657.7 4614.4S 2506.8E 8682.7 6431.4 3324.3S 4158.9E 52.0 2108.2 )1864.8(
11400.0 6658.2 4707.6S 2470.7E 8718.7 6456.1 3343.2S 4176.9E 51.4 2194.0 )1948.4(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #lA and TVD from rkb Pool #6 (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
M.D.
9300.0
9400.0
9500.0
9600.0
97OO.O
98OO.0
9900.0
10000.0
10100.0
10200.0
10300.0
10400.0
10500.0
10600.0
10700.0
10800.0
10900.0
11000.0
11100.0
11200.0
11300.0
11400.0
11500.0
11600.0
11700.0
11800.0
11900.0
12000.0
ARCO Alaska, Inc.
Pad 1R.1A
Kuparuk River Unit,North Slope, Alaska
Reference wel 1 path
CLEARANCE LISTING Page 6
Your ref : lA Version #10
Last revised : 23-0ct-1999
Object wellpath : PGMS <O-8440'>,,4.Pad 1R
Horiz Min'm Ellipse
T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
6685.0 2680.3S 3003.6E 7899.2 6445.4 3709.1S 1144.0E 241.0 2138.7 )1967.6(
6685.0 2777.8S 2981.4E 7949.5 6483.2 3740.0S 1156.1E 242.2 2073.2 )1898.9(
6685.0 2875.3S 2959.2E 7998.8 6520.4 3770.2S 1167.8E 243.5 2009.2 )1831.6(
6685.0 2972.8S 2937.0E 8056.0 6563.7 3805.0S 1181.2E 244.6 1946.8 )1765.6(
6685.0 3070.3S 2914.8E 8110.6 6605.5 3837.9S 1193.9E 246.0 1885.9 )1701.3(
6685.0 3167.8S 2892.5E 8162.9 6645.6 3869.2S 1206.0E 247.4 1826.9 )1638.9(
6685.0 3265.3S 2870.3E 8212.2 6683.7 3898.4S 1217.3E 249.0 1770.1 )1578.6(
6685.0 3362.8S 2848.1E 8258.6 6719.7 3925.8S 1227.7E 250.8 1715.8 )1520.9(
6685.0 3460.3S 2825.9E 8307.6 6757.9 3954.4S 1238.4E 252.7 1664.2 )1466.0(
6685.0 3557.8S 2803.7E 8359.6 6798.6 3984.7S 1249.8E 254.6 1615.5 )1414.1(
6682.8 3655.3S 2781.5E 8409.9 6838.0 4014.0S 1260.7E 256.7 1570.2 )1365.9(
6677.6 3752.7S 2759.3E 8440.0 6861.6 4031.6S 1267.2E 259.4 1529.0 )1322.2(
6672.4 3850.1S 2737.1E 8440.0 6861.6 4031.6S 1267.2E 263.0 1493.1 )1284.4(
6667.3 3947.4S 2715.0E 8440.0 6861.6 4031.6S 1267.2E 266.7 1463.1 )1253.1(
6662.1 4044.8S 2692.8E 8440.0 6861.6 4031.6S 1267.2E 270.5 1439.5 )1228.8(
6657.4 4142.0S 2669.8E 8440.0 6861.6 4031.6S 1267.2E 274.5 1421.6 )1211.0(
6654.7 4238.2S 2642.6E 8440.0 6861.6 4031.6S 1267.2E 278.5 1406.1 )1196.2(
6654.3 4333.0S 2610.9E 8440.0 6861.6 4031.6S 1267.2E 282.6 1392.6 )1184.0(
6655.4 4426.8S 2576.3E 8440.0 6861.6 4031.6S 1267.2E 286.8 1382.9 )1176.4(
6656.5 4520.6S 2541.6E 8440.0 6861.6 4031.6S 1267.2E 291.0 1380.2 )1176.6(
6657.7 4614.4S 2506.8E 8440.0 6861.6 4031.6S 1267.2E 295.2 1384.9 )1184.8(
6658.2 4707.6S 2470.7E 8440.0 6861.6 4031.6S 1267.2E 299.3 1395.2 )1199.2(
6656.9 4799.0S 2430.1E 8440.0 6861.6 4031.6S 1267.2E 303.4 1408.2 )1216.5(
6653.6 4888.3S 2385.4E 8440.0 6861.6 4031.6S 1267.2E 307.5 1423.9 )1236.8(
6646.3 4977.0S 2339.8E 8440.0 6861.6 4031.6S 1267.2E 311.4 1445.8 )1263.4(
6638.1 5065.6S 2294.1E 8440.0 6861.6 4031.6S 1267.2E 315.2 1474.3 )1296.6(
6630.0 5154.2S 2248.5E 8440.0 6861.6 4031.6S 1267.2E 318.8 1508.9 )1335.8(
6621.8 5242.9S 2202.9E 8440.0 6861.6 4031.6S 1267.2E 322.3 1549.2 )1380.3(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #lA and TVD from rkb Pool #6 (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
M,D,
6500.0
6600.0
6700.0
6800.0
6900.0
7000.0
7100.0
7200.0
7300.0
7400.0
7500.0
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit,North Slope, Alaska
CLEARANCE LISTING Page 7
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference wel 1 path
Object wellpath : PGMS <0-8450'>,,16,Pad 1R
Horiz Min'm Ellipse
T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
5330.0 940.0S 2767.7E 6312.9 5387.2 962.6N 2428.0E 349.9 1933.5 )1819.4(
5408.1 957.1S 2827.5E 6413.6 5456.2 973.3N 2500.6E 350.4 1958.5 )1841.8(
5495.9 970.4S 2873.3E 6504.7 5518.4 982.9N 2566.5E 351.1 1977.4 )1858.3(
5590.5 979.6S 2904.2E 6588.6 5575.5 991.9N 2627.3E 352.0 1990.9 )1869.6(
5686.7 987.5S 2930.3E 6673.3 5633.2 1000.9N 2688.6E 353.1 2003.8 )1880.3(
5782.8 995.5S 2956.5E 6764.2 5695.2 1010.5N 2754.3E 354.2 2018.0 )1892,2(
5879.0 1003.4S 2982.7E 6852.8 5755.8 1019.5N 2818.4E 355.4 2033.2 )1905.3(
5975.2 1011.3S 3008.8E 6937.7 5813.9 1028.0N 2879.7E 356.4 2049.7 )1919.7(
6071.4 1019.2S 3035.0E 7022.0 5871.7 1036.4N 2940.4E 357.4 2067.4 )1935.5(
6167.3 1030.7S 3060.9E 7103.3 5927.4 1044.5N 2999.1E 358.3 2089.9 )1956.2(
6260.1 1058.2S 3085.3E 7160.0 5966.2 1050.5N 3040.0E 358.8 2129.6 )1994.8(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #~ and l~/D from rkb Pool ~15 (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit,North Slope, Alaska
CLEARANCE LISTING Page 8
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference wel 1 path
Object wellpath : PGMS <0-10215'>,,26,Pad 1R
M.D. T.V.D.
Hori z Mi n' m E11 i pse
Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
6500.0
6600.0
6700.0
6800.0
6900.0
5330.0
5408.1
5495.9
5590.5
5686.7
940.0S 2767.7E 5908.3 4249.5 957.8S 3518.9E 91.4 1316.1 )1259.4(
957.1S 2827.5E 6003.8 4303.7 970.0S 3596.6E 91.0 1345.9 )1288.1(
970.4S 2873.3E 6092.1 4353.9 980.8S 3668.5E 90.8 1391.6 )1332.9(
979.6S 2904.2E 6173.5 4400.1 990.6S 3734.7E 90.8 1451.5 )1392.1(
987.5S 2930.3E 6250.2 4443.8 999.6S 3797.1E 90.8 1515.3 )1455.2(
7000.0
7100.0
7200.0
7300.0
7400.0
5782.8
5879.0
5975.2
6071.4
6167.3
995.5S 2956.5E 6325.9 4486.8 1008.4S 3858.8E 90.8 1579.2 )1518.5(
1003.4S 2982.7E 6407.2 4533.0 1017.6S 3925.1E 90.9 1643.2 )1581.7(
1011.3S 3008.8E 6523.0 4600.3 1028.8S 4018.6E 91.0 1706.0 )1643.2(
1019.2S 3035.0E 6601.6 4646.7 1035.7S 4081.7E 90.9 1767.9 )1704.4(
1030.7S 3060.9E 6678.2 4692.0 1042.3S 4143.2E 90.6 1829.7 )1765.4(
7500.0
7600.0
7700.0
7800.0
6260.1
6347.2
6425.7
6493.5
1058.2S 3085.3E 6754.2 4736.8 1048.7S 4204.2E 89.5 1890.2 )1824.5(
1101.9S 3107.3E 6825.8 4779.0 1054.8S 4261.8E 87.7 1947.8 )1880.3(
1160.5S 3126.4E 6889.7 4816.6 1060.1S 4313.2E 85.2 2001.9 )1931.8(
1232.3S 3141.9E 6956.8 4856.1 1065.6S 4367.1E 82.3 2051.7 )1978.1(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #lA and TVD from rkb Pool ~ (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit,North Slope, Alaska
CLEARANCE LISTING Page 9
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference wel 1 path
Object wellpath : PGMS <0-11368'>,,29,Pad 1R
M.D. T.V.D.
Rect Coordinates
Horiz Min'm Ellipse
M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
6500.0 5330.0 940.0S 2767.7E
6600.0 5408.1 957.1S 2827.5E
6700.0 5495.9 970.4S 2873.3E
6800.0 5590.5 979.6S 2904.2E
5698.3 3909.5 2178.9S 3199.5E 160.8 1933.7 )1848.4(
5802.9 3968.4 2220.1S 3275.4E 160.5 1966.9 )1880.0(
5885.9 4015.6 2252.8S 3335.3E 160.2 2012.2 )1924.7(
6006.8 4085.2 2300.4S 3421.9E 158.6 2068.4 )1980.2(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot ~IA and TVD from rkb Pool #6 (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit,North Slope, Alaska
CLEARANCE LISTING Page 11
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference wellpath
Object wellpath : PGMS <0-10295'>..25,Pad 1R
Horiz Min'm Ellipse
M.D. T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
6500.0 5330.0 940.0S 2767.7E 5738.4 4216.1 712.0N 3405.7E 21.1 2092.1 )1976.9(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #lA and TVD from rkb Pool ~6 (80.00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit. North Slope, Alaska
CLEARANCE LISTING Page 12
Your ref : lA Version #10
Last revised : 23-0ct-1999
Reference well path
Object wellpath : PGMS <0-8570'>,,1,Pad 1R
M.D. T.V.D.
Horiz Min'm Ellipse
Rect Coordi nates M.D. T,V. D. Rect Coordinates Bearing Di st Sep' n
6500.0 5330.0
6600.0 5408.1
6700.0 5495.9
6800.0 5590.5
6900,0 5686.7
940.0S 2767.7E 6502.0 5330.0 940.0S 2767.7E 222.3 0.0 )0.0(
957.1S 2827.5E 6601.5 5402.1 958.9S 2833.7E 106.3 8.8 )0.0(
970.4S 2873.3E 6698.2 5472.3 977,3S 2897.5E 105.8 34.4 )0.0(
979.6S 2904.2E 6789,3 5538.8 994.4S 2957.4E 105.5 75.6 )16.2(
987.5S 2930.3E 6878.3 5603.8 1011.0S 3015.8E 105,4 121.4 )60.8(
7000.0 5782.8
7100.0 5879.0
7200.0 5975.2
7300.0 6071.4
7400.0 6167.3
995.5S 2956.5E 6967.0 5668.6 1027.6S 3074.2E 105.3 167.1 )105.7(
1003.4S 2982.7E 7055.8 5733.3 1044.2S 3132.6E 105,2 213.0 )150.7(
1011.3S 3008.8E 7144.6 5798.1 1060.8S 3191.0E 105.2 258.9 )195.8(
1019.2S 3035.0E 7233.8 5863.2 1077.6S 3249.7E 105.2 304.8 )240.9(
1030.7S 3060.9E 7324,7 5929.7 1094.6S 3309.3E 104.4 349.6 )284.9(
7500.0 6260.1
7600.0 6347.2
7700.0 6425.7
7800.0 6493.5
7900.0 6548.2
1058,2S 3085.3E 7417.7 5998.2 1111.8S 3369.8E 100.7 390.4 )324.1(
1101.9S 3107.3E 7508.7 6065.8 1128.2S 3428.5E 94.7 427.8 )358.4(
1160,5S 3126.4E 7592.5 6128.6 1142.8S 3482.0E 87.1 463.7 )388.8(
1232.3S 3141.9E 7670.1 6187.2 1155.9S 3531.1E 78.9 501.0 )417.4(
1315.0S 3153.4E 7734.6 6236.3 1166.6S 3571.6E 70.5 542,4 )447.1(
8000.O 6588.5
8100.0 6612.9
8200.0 6626.9
8300,0 6640.8
8400.0 6654.0
1406.1S 3160.5E 7786.3 6275.8 1175.0S 3603.9E 62.5 589.7 )481.0(
1502.9S 3163.0E 7824.3 6304.9 1181,2S 3627.5E 55.3 643.6 )521.5(
1601.9S 3162.5E 7853.3 6327.2 1185.9S 3645.5E 49.3 704.5 )570.6(
1701.0S 3162.0E 7879.7 6347.5 1190.1S 3661.8E 44.4 772.5 )629.6(
1800,0S 3161.4E 7907.3 6368.8 1194.6S 3678.8E 40.5 846.0 )695.9(
8500,0 6659.3
8600.0 6660,4
8700.0 6662.6
8800.0 6666.2
8900,0 6670.5
1899.9S 3160.9E 7927.1 6384.0 1197.7S 3690.9E 37.0 921.8 )766.2(
1999.8S 3159.8E 7943.3 6396.6 1200.4S 3700.9E 34.1 1000.8 )840.9(
2099.4S 3150.7E 7956.0 6406.4 1202,4S 3708.7E 31.9 1087.0 )924.3(
2197,4S 3131.3E 7962.5 6411.5 1203.4S 3712.7E 30.3 1179.3 )1015.0(
2293.8S 3105,3E 7965.4 6413.7 1203.9S 3714.4E 29.2 1274.7 )1109.3(
9000.0 6674.9
9100,0 6679.3
9200.0 6683.6
9300.0 6685.0
9400.0 6685.0
2390.2S 3079.2E 7968.2 6415.9 1204.3S 3716.2E 28.2 1370.8 )1204.5(
2486.7S 3053.1E 7971.0 6418.0 1204.8S 3717.9E 27.4 1467.5 )1300.4(
2583.1S 3027.1E 7973.8 6420.2 1205,2S 3719.6E 26.7 1564.5 )1396.7(
2680.3S 3003.6E 7976.0 6421.9 1205.6S 3720.9E 25.9 1660.9 )1492.6(
2777.8S 2981,4E 7978.0 6423.4 1205,9S 3722.1E 25.2 1757.3 )1588.4(
9500.0 6685.0
9600.0 6685,0
9700.0 6685.0
9800.0 6685.0
2875.3S 2959.2E 7979.9 6424.9 1206,2S 3723.3E 24.6 1854.1 )1684.7(
2972.8S 2937.0E 7981.9 6426.5 1206.5S 3724.5E 24.0 1951.1 )1781.4(
3070.3S 2914.8E 7983.9 6428.0 1206.8S 3725.7E 23.5 2048.5 )1878.4(
3167.8S 2892.5E 7985.8 6429.5 1207,1S 3726.9E 23.1 2146.1 )1975.7(
All data is in feet unless otherwise stated.
Casing dimensions are not included,
Coordinates from slot #lA and TVD from rkb Pool ~ (80.00 Ft above mean sea level),
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
M.D.
6500.0
6600.0
6700.0
6800.0
6900.0
7000.0
7100.0
7200.0
7300.0
7400.0
7500.0
7600.0
7700.0
7800.0
7900.0
8000.0
8100.0
8200,0
8300.0
8400.0
8500.0
8600.0
8700.0
8800.0
8900.0
9000.0
9100.0
9200.0
9300.0
9400.0
9500.0
9600.0
9700.0
9800.0
CLEARANCE LISTING Page 13
Your ref : lA Version #10
ARCO Alaska, Inc.
Pad 1R, lA
Kuparuk River Unit, North S1 ope, A1 aska
Last revised : 23-0ct-1999
Reference wellpath
Object wellpath : PGMS<O-8568'>Depth Shifted,.1A,Pad 1R
T.V.D.
.0
,1
.9
.5
.7
Horiz Min'm Ellipse
Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n
533O
5408
5495
5590
5686
940.0S 2767.7E 6500,0 5330.0 940.0S 2767.7E 106.1 0.0 )0.0(
957.1S 2827.5E 6599.5 5402.0 958.9S 2833.7E 106.1 8.9 )0.0(
970.4S 2873.3E 6696.2 5472.3 977.2S 2897.5E 105.8 34.5 )0.0(
979.6S 2904.2E 6787.3 5538.8 994.4S 2957.4E 105.5 75.7 )16.2(
987,5S 2930.3E 6876.3 5603.8 1011.0S 3015.9E 105.3 121.4 )60.8(
5782
5879
5975
6071
6167
995.5S 2956.5E 6965.0 5668.6 1027.6S 3074.2E 105.3 167,2 )105.7(
1003.4S 2982.7E 7053.8 5733.3 1044.2S 3132.6E 105.2 213.0 )150.7(
1011.3S 3008.8E 7142.6 5798.1 1060.8S 3191.0E 105.2 258.9 )195.9(
1019.2S 3035.0E 7231.7 5863.1 1077.6S 3249.7E 105.2 304.8 )240.9(
1030.7S 3060.9E 7322.7 5929.7 1094.6S 3309.3E 104.4 349.6 )284.9(
6260.1
6347.2
6425.7
6493.5
6548.2
1058.2S 3085.3E 7415.7 5998.2 1111.8S 3369.8E 100.7 390.5 )324.1(
1101.9S 3107.3E 7506.7 6065.8 1128.2S 3428.5E 94.7 427.8 )358.4(
1160.5S 3126.4E 7590.5 6128.6 1142.8S 3482.0E 87.1 463.7 )388.9(
1232.3S 3141,9E 7668.1 6187.2 1155.9S 3531.1E 78.9 501.0 )417.4(
1315.0S 3153.4E 7732.6 6236.3 1166.6S 3571.6E 70,5 542.4 )447.1(
6588.5
6612.9
6626,9
6640,8
6654.0
1406.1S 3160.5E 7784.3 6275.8 1175.0S 3603,9E 62,5 589.8 )481.0(
1502.9S 3163.0E 7822.3 6304.9 1181.2S 3627.5E 55.3 643.6 )521.5(
1601.9S 3162.5E 7851.3 6327.2 1185.9S 3645.5E 49.3 704.5 )570.7(
1701.0S 3162.0E 7877.7 6347.5 1190.1S 3661.8E 44.4 772.6 )629.6(
1800,0S 3161,4E 7905.3 6368.8 1194.6S 3678.8E 40.5 846,0 )696.0(
6659
6660
6662
6666
6670
1899.9S 3160.9E 7925.0 6384.0 1197.7S 3690.9E 37.0 921.8 )766.2(
1999.8S 3159,8E 7941.3 6396.6 1200.3S 3700.9E 34.1 1000.8 )840.9(
2099.4S 3150.7E 7954.0 6406.4 1202.4S 3708.7E 31.9 1087.0 )924.3(
2197.4S 3131,3E 7960.5 6411.4 1203.4S 3712.7E 30.3 1179.3 )1015.0(
2293.8S 3105.3E 7963.4 6413.7 1203.9S 3714.4E 29.2 1274.7 )1109.3(
6674
6679
6683
6685
6685
2390.2S 3079.2E 7966.2 6415.8 1204.3S 3716.1E 28.2 1370.9 )1204.5(
2486.7S 3053,1E 7969.0 6418.0 1204.8S 3717.9E 27.4 1467.5 )1300.4(
2583.1S 3027.1E 7971.7 6420.1 1205.2S 3719.6E 26.7 1564.5 )1396.8(
2680.3S 3003,6E 7974.0 6421.9 1205.6S 3720.9E 25.9 1660.9 )1492.6(
2777.8S 2981.4E 7975.9 6423,4 1205.9S 3722.1E 25.2 1757.3 )1588.4(
6685
6685
6685
6685
2875.3S 2959.2E 7977,9 6424.9 1206.2S 3723.3E 24.6 1854.1 )1684.7(
2972.8S 2937.0E 7979.8 6426.4 1206.5S 3724.5E 24.0 1951.2 )1781.4(
3070.3S 2914.8E 7981.8 6427.9 1206.8S 3725.7E 23.5 2048.5 )1878.4(
3167,8S 2892.5E 7983.7 6429.4 1207.1S 3726,9E 23.1 2146.1 )1975.7(
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #lA and TVD from rkb Pool ~ (80,00 Ft above mean sea level).
Vertical section is from S 0.00 W 0.00 on azimuth 195.00 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1R
lA
slot #lA
Kuparuk River Unit
North Slope, A1 aska
SUMMARY CLEARANCE
by
Baker Hughes INTEQ
REPORT
Your ref : lA Version #10
Our ref : prop3679
License :
Date printed : 23-0ct-1999
Date created : 22-0ct-1999
Last revised : 23-0ct-1999
Field is centred on n70 16 18.576,w150 5 56.536
Structure is centred on n70 23 12.884,w149 40 37.889
Slot location is n70 23 11.369,w149 40 33.820
Slot Grid coordinates are N 5991049.979, E 539829.377
Slot local coordinates are 154.00 S 139.00 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
Object wellpath
PGMS <0-11653'>,,9,Pad 1H
PGMS <0-7440'>,,22,Pad 1H
PGMS <0-10228'>,,14,Pad 1H
PGMS <O-7561'>,,lO,Pad 1H
PGMS <0-8315'>,,21,Pad 1H
PGMS <O-8090'>,,2,Pad 1H
PGMS <0-8670'>,,18,Pad 1H
PGMS <0-8990'>,,19,Pad 1H
MSS <0-10840'>,,5,Pad 1H
PGMS <O-7510'>,,16,Pad 1H
PGMS <O-8455'>,,17,Pad 1H
PGMS <O-10300'>,,20,Pad 1H
PGMS <O-7880'>,,1,Pad 1H
PGMS <0-11172'>,,13,Pad 1H
PGMS <0-9774'>,,11,Pad 1H
PGMS <0-10172'> ,12,Pad 1H
PGMS <0-10332'> ,15,Pad 1H
GMS <0-8155'>, 3,Pad 1H
GMS <0-8740'>, 8,Pad 1H
PGMS <0-8086'> ,4,Pad 1H
GMS <0-6750'>, 6,Pad 1H
GMS <0-8300'>, 7,Pad 1H
PMSS <0 - 5511'>,,Ugnu-O1,Pad 1H
PMSS <0-6755'>,,17,Pad 1G
MMS <6350 - 7760'>,,lOA,Pad 1G
PMSS <6390 - 7906'>,,10A,Pad 1G
PGMS <O-7970'>,,lO,Pad 1G
Closest approach with 3-
D Minimum Distance method
Last revised Distance M.D.
24-0ct-1998 11206.9 12021.8
23-Jun-1993 10188.1 12021.8
24-Jun-1993 8695.7 10911.1
17-May-1993 10151.0 12021.8
24-Jun-1993 10726.9 12021.8
17-May-1993 10005.3 12021.8
17-May-1993 10944.2 12021.8
18-Feb-1993 4601.8 11354.8
21-Aug-1991 10485.5 12021.8
17-May-1993 8062.5 11988.0
22-Feb-1993 7057.7 11028.0
18-Feb-1993 6675.0 8877.0
5-May-1993 10917.5 12021.8
24-2un-1993 11144.5 12021.8
17-May-1993 11085.0 12021.8
17-May-1993 10748.5 12021.8
17-May-1993 10768.0 12021.8
21-Aug-1991 5747.1 12021.8
21-Aug-1991 10219.9 12021.8
8-~an-1993 7511.3 12021.8
21-Aug-1991 9792.4 12021.8
11-~un-1998 9536.9 11733.0
25-Jun-1998 9263.8 12021.8
lO-Aug-1999 6295.7 12021.8
2-Feb-1999 4246.7 12021.8
8-Sep-1996 4245.4 12021.8
2-Feb-1999 4155.9 12021.8
Diverging from M.D.
12021
12021
11091
12021
12021
12021
12021
11354
12021
11988
11028
8877
12021
12021
12021
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
11955.0
12021.8
12021.8
12021.8
12021.8
12021.8
PGMS <0-9225'>,,16,~
GMS <0-7415'>,,4,Pad 1G
GMS <O-8489'>,,3,Pad 1G
GMS <0-10086'>,,5,Pad 1G
PMSS <2156-2674'>,,6,Pad 1G
GMS <0-9250'>,,6A,Pad 1G
PGMS <O-8851'>,,7,Pad 1G
PGMS <O-8715'>,,8A,Pad 1G
PMSS <2232-3720'>,,8,Pad 1G
PGMS <0-8360'> ,9,Pad 1G
PGMS <0-8208'>, 11,Pad 1G
PGMS <0-9116'>, 12,Pad 1G
PGMS <0-8110'>, 13,Pad 1G
PGMS <0-7950'>, 14,Pad 1G
PGMS <0-7533'>, 15,Pad 1G
MSS <1651-2529'>,,2,Pad 1G
GMS <0-9754'>,,2A,Pad 1G
GMS <0-7970'>,,1,Pad 1G
PGMS <0 - 10180'>,,21,Pad 1R
PGMS <0-7530'> ,3,Pad 1R
PGMS <0-9310'>
PGMS <0-8440'>
PGMS <0-8775'>.
PGMS <0-9303'>.
PGMS <0-7182'>.
PGMS <0-8570'>.
PGMS <0-8225'>
PGMS <0-8800'>
PGMS <0-7295'>.
PGMS <0-8570'>
PGMS <0-9250'>
PGMS <0-7420'>
PGMS <0-8450'>
PMSS <0-5350'>
PGMS <0-10215'>
,2,Pad 1R
,4,Pad 1R
,5,Pad 1R
,6,Pad 1R
,7,Pad 1R
,8,Pad 1R
,9,Pad 1R
lO,Pad 1R
11,Pad 1R
13,Pad 1R
14,Pad 1R
15,Pad 1R
16,Pad 1R
18,Pad 1R
,26,Pad 1R
PMSS <6970 - 12972'>,,24,Pad 1R
PGMS <0-12180'> ,23,Pad 1R
PGMS <0-10080'> ,20,Pad 1R
PGMS <0-9838'>, 19,Pad 1R
PGMS <0-11368'> ,29,Pad 1R
PGMS <0-12388'> ,27,Pad 1R
PGMS <0-10345'> ,17,Pad 1R
PGMS <0-10295'> ,25,Pad 1R
PGMS <0-8320'>,,12,Pad 1R
PGMS <0-3991'>,,U SWPT1,Pad 1R
PMSS <473-11428'>,,32,Pad 1R
PMSS <0-15530'>,,33,Pad 1R
PMSS <741-13570'>,,34,Pad 1R
PMSS <645-12647'>,,31,Pad 1R
MSS <0-9775'>,,E UGNU #1,Pad 1R
PGMS <0-8570'>,,1,Pad 1R
PGMS <0-10810'>,,22,Pad 1R
PGMS<O-8568'>Depth Shifted,,1A,Pad 1R
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
11-Dec-1992
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
2-Feb-1999
lO-Apr-1991
2-Feb-1999
2-Feb-1999
22-0ct-1999
5888.5
4126.9
6146.7
6747.2
6494.1
6546.1
2081.6
40O7.0
5029.8
1649.5
6311.3
7039.7
7559 1
6041 8
5279 7
7090 9
7055 2
5776 1
4716 1
1845 6
1108 8
1380 2
3767 7
4611 4
3813 0
4069 4
4375 2
5135 8
3457 1
3530 7
3598 3
2870.9
1933.0
5181.3
1315.7
2509.1
3966.5
4527.3
4837.7
1933.1
1910.7
5405.8
2091.4
4165.6
10167.2
5162.9
5070.4
4780.9
5220.9
6028.7
0.0
3470.8
0.0
12021.
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021 8
12021 8
12021 8
12021 8
6498 0
8050 0
9357 0
11187 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498 0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6498.0
6500.0
6498.0
6498.0
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
12021.8
6498.0
8050.0
9357.0
11187.0
12021.8
12021.8
8970.0
9786.O
6498.0
6498.0
7520.0
6498.0
6498.0
6498.0
6498 0
6498 0
6498 0
11958 0
8883 0
11262 0
9909 0
9003 0
6498 0
11980 0
6498 0
6498 0
6498 0
9366 0
9100 0
6498 0
11031 0
6498 0
650O.0
12015.0
6498.0
1 -01A Proposed Comple( ,on
Liner top and
Whipstock
Depth's are
based on
Original RKB to
the hanger from
the
7" Csg Detail.
These depths
need to be
converted to
Pool 6 RKB.
Window in 7"
7" Baker Bridge Plug
set @ +/-6520' MD.
Abandoned C-Sand
Perfs
8004'- 8103'
Abandoned A-Sand
Peds
8199'- 8245'
8289'-8300'
7",26#,J-55
casing @ 8535' MD
face
Fill
H. 3-1/2" 5M FMC Gen I I I tubing hanger with 3-1/2" L-80 EUE 8rd Mod pin down.
G. 3-1/2" 9.3# L-80 EUE 8rd Mod Tubing to surface.
F. 3-1/2" Camco 'DS' landing nipple with 2.875" ID No-Go profile set at +/-500' MD.
E. 3-1/2" 9.3# L-80 EUE 8rd Mod tubing to 'DS' landing nipple w/ 3-1/2" x 1" Camco
'KBMM' mandrels w/DV's, spaced out as follows:
GLM# ME) TVD
2 TBD TBD
3 TBD TBD
4 TBD TBD
5 TBD TBD
6 TBD TBD
Note: Each GLM should have 6' L-80 handling pups installed on top and bottom.
D. 3-1/2" x 1-1/2" Camco 'MMM' Mandrel w/DCR Dump Kill Valve (3000 psi casing to tubing shear). 6" L-80
handling pups installed on top and bottom of mandrel.
C. 1 joint 3-1/2" 9.3# L-80 EUE 8rd Mod Tubing
B. 3-1/2" Camco 'DS' landing nipple with 2.812" ID and No-Go profile
A. Baker 3-1/2" 'GBH-22' Tubing Seal Assembly w/10' of seals and special Iocator to locate in liner tie back
sleeve. Locator 5.125" OD, seals 4.0" OD. 6' L-80 Handling Pup Joint installed.
Liner Top
Baker 5" x 7" 'C-2 ZXP' Liner Top Isolation Packer and 6' setting sleeve w/5" BTC Box Down.
Baker 5" x 7" 'HMC' Hydraulic Liner Hanger w/5" BTC Pin x Pin.
Baker '80-40' PBR (12' Length w/4" ID seal bore). 3-1/2" EUE 8rd Mod pin down.
Solid Liner 3-1/2" 9,3# L-80 EUE 8rd Mod from Liner Hanger to Landing Collar.
3-1/2" EUE 8rd Landing Collar.
1 joint 3-1/2" L-80 EUE 8rd Mod tubing.
3-1/2" EUE 8rd Float Collar.
2 joints 3-1/2" L-80 EUE 8rd Mod tubing.
3-1/2" EUE 8rd Float Shoe.
.....
Future A3 - A4 Sand Perfs
Fault
BDN 10/21/99
WELL PERMIT CHECKLIST
,. WELL NAME,~'/'~/' .... :'O (4PROGRAM:, exp ~ dev ,/ redrll ~ se~__ wellbore seg ann. disposal para req_
INIT CLASS /.-(~/~, GEOL AREA ~~ UNIT~ ~//~; ON/OFF SHORE ~
ADMINISTRATION
.R DATE
COMPANY
ENGINEERING
~,A~~,. 0 DATE
1. Permit fee attached.
2. Lease number approPriate.' .-A~.' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '- -- '"~' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '
3. Unique well name and numbe~ ...............
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
0. Operator has appropriate bond in force .............
'1. Permit can be issued without conservation order ........
2. Permit can be issued without administrative approval ......
3. Can permit be approved before '15-day wait ...........
GEOLOGY
14. Conductor string provided ...................
15. Surface casing protects all known USDVVs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
2'1. If a re-drill, has a '10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to ' ~'~_~ {) C) psig.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
30. Permit can be issued w/o hydrogen sulfide measures .....
31. Data presented on potential overpressure zones .......
32. Seismic analysis of shallow gas zones .............
y N,~,¢
A.~R DATE 33. Seabed condition survey (if off-shore) ............. ~
"' J/'~"~ 34. Contact name/phone for weekly progress reports [exploratory only]~__~~N
ANNULAR DISPOSAL 35.
APPR DATE
With proper cementing records, this plan
(A) will contain waste in a su~ ....... Y N
(B) will not contam~, or cause drillin~te... Y N
to surface; / -~_
(C) will notim · Y N
(D) will no~.d§mage producing formation or impair recovery from a
poo ,l(and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
Comnmnts/Instructions:
c:\msoffice\wordian\diana\checklist (rev. 09~27~99)
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Decc~nbcr 8, 1998
Drew Hembling
Drilling Team Leader
ARCO Alaska. Inc.
P O Box 100360
Anchorage, AK 99510-0360
Re:
Kuparuk River Unit 1R-01A
ARCO Alaska. Inc.
Permit No: 98-237
Sur Loc: 154'FNL. 139'FWL, Sec. 20, T12N, R10E. UM
Btmhole Loc. 2038'FNL, 165'FEL, Sec. 20, T12N, RIOE. UM
Dear Mr. Hembling:
Enclosed is thc approved application for permit to rcdrill thc above referenced well.
Thc permit to rcdrill does not exempt you from obtaining additional permits required bx' lax,,' from
other governmental agencies? and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must bc given to allow a representative of thc
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may bc given
by contacting thc Commission petroleum field inspector on thc North Slope pager at 659-3607.
)
Commissioner ~
BY ORDER OF THE COMMISSION
dlffEnclosures
CC;
Department of Fish & Game. Habitat Section w/o cncl.
Department of Environmental Conservation w/o cncl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of Work Drill ~ Reddll X I lb Type of Well Exploratory F' Stratigraphic Test E~ Development Oil X
I
Re-Entry [~ Deepen [] Service [] Development Gas r, Single Zone X Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. RKB 82' feet Kuparuk River Field
3. Address 6. Property Designation Kuparuk Oil Pool
P. O. Box 100360, Anchorage, AK 99510-0360 ADL 25635, ALK 2568
4. Location of well at surface 7.' Unit or property Name 11. Type Bond (see 20 AAC 25.025)
154' FNL, 139' FWL, Sec.20, T12N, R10E, UM Kuparuk River Unit Statewide
At top of productive interval (@ TARGET ) 8. Well number Number
1365' FNL, 1400' FEL, Sec. 20, T12N, R10E, UM 1R-01A #U-630610
At total depth 9. Approximate spud date Amount
2038' FNL, 165' FEL, Sec. 20, T12N, R10E, UM December 1998 L~~'~/''/O $200,000
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
property line 9781' MD
165' @ TD feet No close approach feet 2560 6672' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2))
Kickoff depth 8122' feet Maximum hole angle 90° Maximum surface 2300 psig At total deplh (TVD) 2900 psig
@ 6282'
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
2.75" 2.375" 4.6# L-80 FL4S 1881' 7900' 6365' 9781' 6672' N/A Slotted Liner
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural '
Conductor
Surface
Intermediate
Production . .~ .
Perforatio~idneelth: measured0RIGINAL '
true vertical .,~.::....].. : -.:! ,:. i . :: - ~ ,',:',!
20. Attachments Filing fee X Property plat [~ BOP Sketch X Diverter Sketch I-- Drilling program X
Drilling fluid program F,' Timevs depth plot Bi Refraction analysis F~ Seabed report E~ 20 AAC 25.050 requirements
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
S,gned r ~.~..yr.,~__~/..¢..,~ ?.~ ,/ Title Drilling Team Leader Date/i//,2/ 92
~_.,~] Commisfion Use Only ~g~r;qu~rire? ~ I
uAPl number Approval date See cover letter for
Permi er~_.. ~ ~' 50- 4D,.~., 9 /-"/~)~' c:::~/
-- -' other requirements
Conditions of approval Samples required [] Yes ~,' No Mud I Yes 4;~ No
Hydrogen sulfide measures "~ Yes [~ No Directional survey required ~, Yes E., No
Required working pressure for DOPE
2M r~ 3M F! (~M)[-~! 10M Fr~ 15M
Other:L//I~,. l£1"i'";~a.' ': ..... ·"
.;
David W. J0h;i:::i,]i:byorderof
Approved by Commissioner the commission Date
I C~ O ' l ~k
Form 10-401 Rev. 7-24-89 Submit in tri icate
Kuparuk 1R-O1A
CT Sidetrack and Completion
Intended Procedure
Objective:
Plugback existing wellbore with 17 ppg cement. Mill window in straddle
interval thru 3-1/2" tubing and 7" casing. Directionally drill a horizontal well
from the existing wellbore. Complete with 2-3/8" slotted liner.
Intended Procedure:
· Cement squeeze the existing perforations and strad ,cl41e interval with 17
ppg cement. Leave top of cement above GLM at 79~,1~( WOC.
· Underream cement down to 2-7/8" x 3-1/2" XO at 8136'.
· Install mechanical whipstock. Mill window at 8122' through 3-1/2" and
7"casing. Drill 10' of formation and perform leak off test to 0.5 ppg
above the highest anticipated mud weight. Plans are for drilling this
sidetrack overbalanced with a kill weight mud.
· Directionally drill 2-3/4" x 1658' horizontal well to access Kuparuk A
reserves.
· Run 2-3/8" slotted liner to TD.
· Place on production.
Drilling fluids will be injected into disposal well 1 R-18.
November 10, 1998
Kuparuk 1R-01A
Potential Drilling Hazards
POST ON RIG
No H2S gas is anticipated from this well.
BHP: 2900 psi ~ 6282' TVD, 6200'ss (8.9 ppg EMW) estimated
pressure. Reservoir frac gradient is -0.8 psi/ft or 15.4 EMW.
Plans are to drill with 9.5 ppg mud which provides sufficient over-
balanced pressure. Perform a leak-off test to 10 ppg.
Maximum anticipated WHP w/full column of gas' -2300 psi assuming
O. 1 psi/ft gas gradient.
· No gas saturated intervals are expected.
ARCO Alaska, Inc.
Kuparuk
1R-01
ilR-01
PBTD: i 8.570 flKB
APl:
SSSV Type:
Annular Fluid:
Last Tag:
Rev Reason:
i Elevations
500292140400 ! Well Type: i PROD
Camco 'TRDP-1A-SSA' i Oriq Completion: ! 8/27/85
Last W/O: 10/29/90
8455 I Last Tag Date:! 12/12/94
New Schem i Last Update:; 2/10/98
TD: 18,570 ftKB
Max Hole Angle:;48 deg @ 4600
Angle (~ TS:139 deg~ 8007
Angle @ TD: i 37 deg @~ 8570
i Grd ! 45 ft i Original Rig RKB ! 33 ft
!Casing String - CONDUCTOR
Btm i Jnts i Wt i Grd
62.501
Thd
16.000 in CONDUCTOR 1151 ; H-40
!Casing String - SURFACE
!Item Btm I Jnts ! Wt i Grd Thd
19 625 in SUR. CASING 4,3801 ; 36.00i J-55
iCasinq String - PRODUCTION
l ltem
7.000 in PROD. CASING
Tubing String - TUBING
Btm i Jnts
8,5351
Wt I Grd
26.00! J-55
Thd
Item
Top i Len
331
J nts
Wt I Grd
Thd
3.500 in TUBING 7,945 9.30i J-55 EUE 8RD AB MOD
3.500 in TUBING 7,978; 158 9.30{ L-80 EUE 8RDAB MOD
2.875 in TUBING 8,136; 13 6.50i J-55 EUE8RDABMOD
Perforations
Interval ',Zone :Status
8,072 - 8,103 i C-1,UNIT B
8,199 - 8,245 !A-3
8,289 - 8,300 iA-2 11 i 4110/26/85
8,004- 8,103
8,200- 8,22O
!UNIT
I D,C-4,C-3,C-2,C-1
B
A-3
Feeti SPF! Date '~ Type iComment
311 12'. 10/26/85 !5" HJ II Csg Gun 1120 deg. phasing;
! i REPERF 10/28/90
46~ 4:, 10/26/85 i4" HJ II Csg Gun 190 deg. phasing
!4" HJ II Csg Gun 90 deq. phasing
'.5" Csg Gun REPERF; 60 deg. phasing
991 12i 10/28/90
20i 6 i 12/5/94
i2 1/8" EnerJet
REPERF; Zero deg.
phasing
Gas Lift Mandrels/Valves
Stn' MD TVD Man Mfr ',Man Type
1 [ 2,279! 2 272iCamco
l 2 i 4,2951 3 808! Camco
3 i 5,543 4 658!Camco
4 i 6,2341 5,139!Camco !3 1/2 X 1 KBUG
5 ", 6,6721 5 455i Camco i3 1/2 X 1 KBUG
I 6 '. 7,113"; 57771Camco
7 i 7.4871 6 052!Camco
8 ': 7 902i 6 367 Camco
I Production Mandrels/Valves
Stn MDi TVD~, Man Mfr
9 i 7,984! 6,4301 Camco
! , i MMG-W
Other {plugs,~quip., etc.) - JEWELRY
Mfr !Type :Latch
GLV !BK
Port ! TROi Run
!3 1/2 X I KBUG 0.188 1374.0', 12/17/94;
i3 1/2 X I KBUG DV iBK 0.000 ': 0.0~; 12/7/94!
;3 1/2 X I KBUG GLV i BK 0.000 I 1337.0~ 12/17/94',
31/2X1KBUG
3 1/2 X 1 KBUG
3 1/2 X 1 1/2 MMG-2
DV
DV
GLV !BK
DV i BK
ov IRK
Type !latch
DV !RKP
Man Type i Mfr
3 1/2 X 1 1/2
0.000 j 0.0 10/29/90!
0.000 ! 0.0: 12/7/94
0.000 i 1305.0! 12/17/94
0.000 ' 0.0! 10/29/90
0.250 'i 0.01 12/16/94
Port
0.000
I TRO;, Run
! 0.0i 10/29/90
Depth! Type ! Description J ID
1,7971 SSSV ! Camco 'TRDP-1A-SSA' !2.812
7,947 i OEJ ! Camco 'OEJ' ;2.812
7,9691PKR
8,126 PKR
8,128 BPL PORTED NIPPLE
8,141 NO GO
8,149 i SHEAR OUT
8,149 !TUBING TAIL
Other (plugs, equip., etc.) - SLEEVE
! Camco 'HRP-1-SP'- 12.867
i Baker 'DB' - ~{~I~D¢ 12.875
jAVA ~>J 'L~2' i 2.750
~ Camco 'D' Nipple f 2.250
! Camco t 2.441
_.1 ...[ ti
iTubing '~7~,X~"/'~ ~.(~f~ ~)i-~(.¢' !2.441
Depth! Type
8,128 BPI SLEEVE
Fish. FISH
i Description I ID
lAVA; Set on 10/15/94 i2.310
SSSV --
TUBING --
PROD. CASING --
Depthi Description
Comment
8,212i 1" GLV
~ Empty Pocket; Fell to Rathole
Gas Lift Mandrel/Valve --
1
SUR. CASING --
Gas Lift
Mandrel/Dummy Valve
2
Gas Lift MandrelNalve 3
Gas Lift --
Mandrel/Dummy Valve
4
Gas Lift
Mandrel/Dummy Valve
5
Gas Lift MandrelNalve --
6
Gas Lift --
Mandrel/Dummy Valve
7
Gas Lift MandrelNalve --
8
OEJ --
PKR --
TUBING
Production
Mandrel/Dummy Valve
9
Perf
Perf
PKR ----
TUBING
NOGO --
SHEAR OUT --
TUBING TAIL --
Peri
Peri
GLV
Perf
KRU 1 R-01A Proposed CT
Sidetrack Horizontal
3-1/2" Ti
Upper Packer 7969'
3-1/2" Camco TRDP SSSV
Production
Mandrel 7984'
AVA Ported
Nipple 8128'
3-1/2" x 2-7/8" XO 8136'
Lower Packer 8140'
Tbg Tail 8149'
/~op of 2-3~8"
Liner in 3-1/2"
Tubing @ ~7900'
2-3~8" Slotted liner
~7900' to TD
cut thru 3-1/2"
and 7" at 8122'
2-3~4" Open hole
TD @
9781'
7" Casing
shoe @ 8535'
Current perforations to
be cement squeezed
C T Drilling Wellhead Detail
Methanol Injection
Otis 7" WLA
Quick Connect
Alignment Guide Flange
7-1/16", 5M Ram Type Dual
Gate BOPE
Flanged Fire Resistant
Kelly Hose to Dual HCR
Choke Manifold
~ CT Injector Head
? I % Stuffing Box (Pack-Off), 10,000 psi Working Pressure
I
-- 7" Riser
I
-I
~. Annular BOP (Hydril),7-1/16" ID 5000 psi WP
(3.5")
/ (~ ' Cutters or
~ Combination Cutter/Blinds
Slip/Pipe Rams
Man
Manual Valves Drilling spool 7-1/16", 5M
by 7-1/16", 5M
Manual over Hydraulic
Ram Type Dual Gate BOPE
7-1/16" ID with
Pipe/Slip Rams
Manual Master Valve
0.458' (5.5")
2" Pump-In
Hanger
Fire resistant Kelly Hose to
Flange by Hammer up 1/4 Turn
Valve on DS Hardline to Standpipe
manifold
7" Annulus
9-5/8" Annulus
Structure : Pad 1R Slot : 1R-O1
Field : Kuparuk River Unit Location : North Slope, Alaska
East (feet) ->
Crcat¢.d by plm~ner
Date pmotte¢ : 9-Nov~g8
Plot Reference is IR-O1A Ver~;ion J6.
Coordinates o,e in leer reference IR-0h
1rue Vertical Depths a~e reference rkb - MSL = 82 ft,
--- Bakor Hughos INTEQ ---
3500 3600 37[)0 3800 ,3900 4000 41 O0 4200 4500 4400 4500 4600 -1700 4800 4900 $000 51 O0
L .... J_~._J__.__.L__..i L_.__J..~, I I _ .._...L__ I .J~£.__..L~.~__ J__.__ __L__.___L_,__/_ _., ._ _L_ .._ L _ __.J~__J_ ..__,L____ ._[_ .___L _.. J._. _._J.___.__J J~ __ J____ J._...,. J.__./
~NTE{~2
6100
6200
6300
640u
6500
I---6600
I
6700
\,
-~}....._ Tie on - 6360,50 Tvd, t209.39 S, 3755.61 E
----...._ ........... KOP -- 8122 MD, 6455.29 TVDss
Tie ¢,n - ,39.1 $Inc, 8000.00 bl,J. 6560.50 Tvd. 3861.1'2 Vs
·
\
k,.\ KOP - 8122 MD. 6455.29 TVDss
'X
,,
\
iR-Olbhs
® I R- 0 '1 bhs '"\
T.D. & End of Turn - 6590.00 hz,J, 1880.00 5, 4980.00 E /
1R-.O i ihs 1R-O I ehs ·
'I.D. ~z. End of Turn - 90.00 Inc. 9780.74 M,J, 6590 30 Tvd. $274.70 ~/s
3700 3800 3900 4000 4100 4200 4300 ,4400 ~500 4601} 4700 4.~00 -~900 5000 5100 5200 5}00 5400 5500 5600 ~,~00 5800
Vertical Section (feet) ->
Azimuth 118.41 wi}h reference 0.00 N, 0.00 E from ~R-01
900
I000
I100
1200
1300
0
1400 ~
--I-
~500 ?
1600
I
1700
1800
1900
2000
2100
Co~npauy:
Well:
Calculation Method:
Vertical Sect. Plane:
Vertical Sect. Plane:
Measured Depth from:
True Vertical Depth:
ARCO Alaska, hie.
1R-01A Version//6
Minimum Curvature
118.410 TRUE
118.110 GRID
RKB
Sea level
Proposal Calculations
Coordinates provided in: TRUE and GRID relative to Wellhead
and ALASKA STATE PLAN
Rig:
Field:
Mag. Declination:
(;rid Correction: 0.300
Total Correctiou: 27.000
Dip Auglc: 80.66
RKB Height: 82.00
Nabors 3s/CTU #4
Prudhoc Bay, Alaska
27.300
Coords. - TRUE
N(+)/S(-) E(+)/W(-)
Lat. (Y)
-1209.39 3735.61
-1213.36 3750.88
-1217.33 3766.12
-1221.28 3781.35
-1225.24 3796.57
-1228.71 3809.94
-1229.18 3811.77
-1232.54 3827.95
-1234.93 3845.63
-1236.34 3864.68
-1236.76 3884.95
-1236.17
-1234.60
-1232.04
-1228.52
-1224.06
-1218.7t
-1213.83 4042.33
-1212.52 4047.28
Coords. - ASP
N(+)/S(-) E(+)/W(-)
l.at. (Y)
5989860.54 543570.99
Coords. - GRID
E(+)/W(-)
3741.61
5989856.65 543586.28 3756.90
5989852.76 543601.54 3772.16
5989848.89 54.3616.80 3787.42
5989845.01 543632.03 3802.65
5989841.61 543645.42 3816.04
5989841.t5 543647.26 3817.88
5989837.87 543663.45 3834.07
5989835.57 543681.14 3851.76
5980834.26 543700.20 -1215.72 3870.82
5989833.96 54372{'}.47 -1216.02 3891.09
5989834.65 543741.81 -1215.33 3912.43
5989836.34 543764.05 -1213.64 3934.67
5989839.02 543787.(.12 -1210.96 3957.64
5989842.66 543810.54 -1207.32 3981.16
5989847.25 -1202.73 4005.07
5989852.73 543858.55: -1197.25 4029.17
5989857.70 -1192.28 4048.34
5989859.(N 543882.67 -1190.94 4053.29
-1206.50 4071.52 5989865.19
-1201.12 4095.91 5989870.70
4120.44
4145.08
4169.82
4194.65
4219.54
4244.48
-1181.48 4269.46
-1181.28 4294.45
-1181.73 4319.44
5989875.57
5989879.80
5989883.38
5989886.32
5989888.61
598989O.25
5989891.24
543906.88 184.79 4077.50
543931.24 179.28 4101.86
543955.74 174.41 4126.36
543980.36 170.18 4150.98
544005.09 166.60 4175.71
544029.90 - 163.66 4200.52
544054.78 161.37 4225.40
544079.72 - 159.73 4250.34
544104.68 - 158.74 4275.30
5989891.58 544129.67 -1158.40 4300.29
5989891.26 544154.66 -1158.72 4325.28
-1182.83 4344.40 5989890.29 544179.64 -1159.69 4350.26
-1184.58 4369.34 5989888.67 544204.58 -1161.31 4375.20
-1186.99 4394.22 5989886.39 544229.47 -1163.59 4400.09
-1190.04 4419.02 5989883.47 544254.29 -1166.51 4424.91
-1193.74 4443.75
-1198.08 4468.36
-1203.06 4492.86
-1208.69 4517.22
5989879.90 544279.{')3 -1170.08 4449.65
5989875.69 544303.671 -1174.29 I 4474.29
5989870.83 544328.19 -1179.15 4498.81
5989865.34 544352.58 -1184.64 4523.20
Job No:
AFE No:
API Nu:
BHI Rep:
Joh Start Date:
Joh Eud Date:
Comments
Tie in Position
Kick off Point
Meas. Incl. TRUE GRID Subsea Coords. - TRUE Coords. - ASP Coords. - GRID Dogleg Tool Face Vertical Build Turn
Depth Angle Azi. Azi. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Section Comments
(de~) (de~) (d~) (fl) Lat. (Y) Dep. (X) Lat. (Y ~ Dep. (X) Lat. (Y) Dep. (X) (°/1001't) (0,0) (°/I 00ft) (°/100ft')
8900.00 89.65 105.24 104.94 6589.76 -1214.94 4541.42 5989859.21 544376.82 -1190.77 4547.44 6.00 85.00 4572.52 0.44 6.00
8925.00 89.77 106.74 106.44 6589.89 -1221.83 4565.45 5989852.45 54440{).89 -1197.53 4571.51 6.00 85.00 4596.94 0.48 6.00
8950.00 89.88 108.23 107.93 6589.97 -1229.34 4589.30 5989845.{)6 544424.77 -1204.92 4595.39 6.00 85.00 4621.48 0.44 5.96
8975.00 90.00 109.73 109.43 6589.99 - 1237.47 4612.94 5989837.05 54444.8.~5 - 1212.93 4619.07 6.00 85.00 4646.15 0.48 6.00
8975.07 90.00 109.73 109.43 6589.99 -1237.49 4613.00 5989837.03 54444.8.52 -1212.95 4619.14 6.00 89.00 4646.21 0.00 0.00 3
9000.00 90.00 112.22 111.92 6589.99 -1246.42 4636.28 5989828.23 54.4471.84 -1221.75 4642.46 10.00 89.00 4670.93 0.00 9.99
9025.00 90.00 114.72 114.42 6589.99 -1256.37 4659.21 5989818.39 544.494.82 -1231.59 4665.44 10.00 89.00 4695.84 0.00 10.00
9050.00 90.00 117.22 116.92 6589.99 -1267.32 4681.68 5989807.57 544517.35 -1242.41 4687.97 10.00 89.00 4720.81 0.00 10.00
9075.00 90.00 119.72 119.42 6589.99 -1279.24 4703.66 5989795.76 5~4539.39 -1254.22 4710.01 10.00 89.00 4745.81 0.00 10.00
9077.76 90.00 120.00 119.70 6589.99 -1280.61 4706.05 5989794.40 544541.79 -1255.58 4712.41 10.00 89.00 4748.57 0.00 10.14
9100.00 90.00 122.24 121.94 6589.99 -1292.10 4725.09 5989783.01 544560.89 -1266.97 4731.51 10.08 89.00 4770.78 0.00 10.07
9125.00 90.00 124.76 124.46 6589.99 -1305.90 4745.93 5989769.32 544581.80 -1280.66 4752.42 10.08 89.00 4795.68 0.00 10.08
9150.00 90.00 127.28 126.98 6589.99 -1320.60 4766.15 5989754.73 544602.10 -1295.25 4772.72 10.08 89.00 4820.46 0.00 10.08
9175.00 90.00 129.80 129.50 6589.99 -1336.18 4785.70 5989739.25 544621.73 -1310.73 4792.35 10.08 89.00 4845.07 0.00 10.08
9200.00 90.00 132.32 132.02 6589.99 -1352.60 4804.55 5989722.93 54464{).67 -1327.05 4811.29 10.08 89.00 4869.46 0.00 10.08
9225.00 90.00 134.84 134.54 6589.99 -1369.83 4822.66 5989705.80 544658.87 -1344.18 4829.49 10.08 89.00 4893.59 0.00 10.08
9250.00 90.00 137.37 137.07 6589.99 -1387.84 4839.99 5989687.87 544676.29 -1362.11 4846.91 10.08 89.00 4917.40 0.00 10.12
9275.00 90.00 139.89 139.59 6589.99 -1406.60 4856.52 5989669.20 544692.91 -1380.78 4863.53 10.08 89.00 4940.86 0.00 10.08
9300.00 90.00 142.41 142.11 6589.99 -1426.07 4872.20 5989649.81 544708.70 -1400.17 4879.32 10.08 89.00 4963.92 0.00 10.08
9325.00 90.00 144.93 144.63 6589.99 -1446.21 4887.01 5989629.75 544723.61 -1420.23 4894.23 10.08 89.00 4986.52 0.00 10.08
9350.00 90.00 147.45 147.15 6589.99 -1466.98 4900.92 5989609.05 544737.63 -1440.93 4908.25 10.08 89.00 5008.64 0.00 10.08
9375.00 90.00 149.97 149.67 6589.99 -1488.34 4913.90 5989587.76 544750.72 -1462.22 4921.34 10.08 89.00 5030.23 0.00 10.08
9400.00 90.00 152.49 152.19 6589.99 -1510.25 4925.93 5989565.91 544762.87 -1484.07 4933.49 10.08 89.00 5051.23 0.00 10.08
9425.00 90.00 155.01 154.71 6589.99 -1532.67 4936.99 5989543.55 544774.04 -1506.43 4944.66 10.08 89.00 5071.63 0.00 10.08
9450.00 90.00 157.53 157.23 6589.99 -1555.56 4947.05 5989520.72 544784.22 -1529.26 4954.84 10.08 89.00 5091.36 0.00 t0.08
9475.00 90.00 160.05 159.75 6589.99 -1578.86 4956.09 5989497.46 544793.39 -1552.52 4964.01 10.08 89.00 5110.41 0.00 10.08
9500.00 90.00 162.57 162.27 6589.99' -1602.54 4964.10 5989473.82 544801.52 -1576.16 4972.14 10.08 89.00 5128.72 0.00 10.08
9525.00 90.00 165.09 164.79 6589.99, -1626.55 4971.06 5989449.85 544808.61 -1600.13 4979.23 10.08 89.00 5146.26 0.00 t0.08
9550.00 90.00 167.61 167.31 6589.99 -1650.84 4976.96 59894.25.59 544814.64 -1624.39 4985.26 10.08 89.00 5163.01 0.00 10.08
9575.00 90.00 170.13 169.83 6589.99 -1675.37 4981.79 5989401.(19 544819.59 -1648.89 4990.21 10.08 89.00 5178.92 0.00 10.08
9600.00 90.00 172.65 172.35 6589.99 -1700.09 4985.53 5989376.39 544823.46 -1673.59 4994.08 10.08 89.00 5193.98 0.00 10.08
9625.00 90.00 175.17 174.87 6589.99 -1724.95 4988.18 5989351.55 544826.25 -1698.43 4996.87 10.08 89.00 5208.13 0.00 10.08
9650.00 90.00 177.69 177.39 6589.99' -1749.89 4989.74 5989326.61 544827.93 -1723.37 4998.55 10.08 89.00 5221.37 0.00 10.08
9675.00 90.00 180.21 179.91 6589.99 -1774.89 4990.20 59893(11.62 544828.52 -1748.36 4999.14 10.08 89.00 5233.67 0.00 10.08
9700.00 90.00 182.73 182.43 6589.991 -1799.88 4989.56 5989276.63 544828.01 -1773.35 4998.63 10.08 89.00 5244.99 0.00 10.08
9725.00 90.00 185.25 184.95 6589.99, -1824.82 4987.82 5989251.68 544826.40 -1798.30 4997.02 10.08 89.00 5255.32: 0.00 10.08
9750.00 90.00 187.77 187.47 6589.99 -1849.65 4984.98 5989226.83 544823.70 -1823.15 4994.32 10.08 89.00 5264.65 0.00 10.08
9775.00 90.00 190.29 189.99 6589.99 -1874.34 4981.06 59892{)2.12 54.4819.90 -1847.86 4990.52 10.08 89.00 5272.94 0.00 10.08
9780.74 90.00 190.87 190.57 6589.99 -1879.98 4980.01 5989196.,47 544818.88 -1853.51 4989.50 10.08 0.00 5274.70 0.00 10.1~ T.D.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COM,v~ISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of RequeSt/Abandon ~ Suspend _
Alter casing _ Repair well _ Plugging __
Change approved program _ Pull tubing
2. Name of Operator 5. Type of Well:
Development X.
ARCO Alaska, Inc. Exploratory __
3. Address Stratigraphic __
P. O. BOX 100360, Anchorage, AK 99510 Service __
Operation Shutdown __ Re-enter suspended well_
Time extension_ Stimulate_
Variance Perforate Other
--
6. Datum elevation (DF or KB)
82' RKB
feet
7. Unit or Property name
Kuparuk River Unit
4. Location of well at surface
154' FNL, 139' FWL, Sec.20, T12N, R10E, UM
At top of productive interval
1365' FNL, 1400' FEL, Sec. 20, T12N, R10E, UM
At effective depth
At total depth
1451' FNL, 1066' FEL, Sec 20, T12N, R10E, UM
8. Well number
1R-01
9. Permit number
85-175
10. APl number
50-029-21404
11. Field/Pool
Kuparuk River
12. Present well condition summary
Total Depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural
Conductor 115'
Surface 4380'
Intermediate
Production 8535'
Liner
8570'
6891'
8453'
6797'
Size
16"
9.625"
7"
feet
feet
feet
feet
Plugs (measured) None
Junk (measured) None
Cemented Measured depth True vertical depth
250 sx CS II 115' 115'
1250 sx PF'E' Ill 4380' 3867'
& 420 sx PF'C'
250 sx Class G & 8535' 6864'
200 sx PF'C'
Perforation depth:
measured
8004'-8103',8199'-8245',8200'-8220',8289'-8300'
true vertical
6446'o6523', 6597'-6634', 6598'-6614', 6668'-6678'
Tubing (size, grade, and measured depth)
3.5", 9.3#, J-55 @ 7978', 2.875", 6.5#, J-55 @ 8136'
Packers and SSSV (type and measured depth)
Baker 'DB' Retr. Pkr @ 8126' and Camco HRP-1SP @ 7955', Camco SSSV TRDP-1A-SSA @ 1797'
13. Attachments
Description summary of proposal X
Detailed operation program
BOP sketch
14. Estimated date for commencing operation
November 1998
16. If proposal was verbally approved
Name of approver Date approved ! Service
117. I hereby certify that the~ ~
foregoing is true//a/r¢l correct to the best of my knowledge.
I Signed"~.~?*~"',--.-~_¢"._./,¢.c/' -- Title Kuparuk Drilling Team Leader
I '"~. FOR COMMISSION USE ONLY
15. Status of well classification as:
Oil X Gas_
Suspended_
Conditions of approval: Notify Commission so representative may witness
Plug integrity _ BOP Test _ Location clearance
Mechanical Integrity Test_ Subsequent form require 10-
.Approved by the order of the Commission
IApproval No.
I
Commissioner Date
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
ARCO Alaska, Inc.
7:3-426
CHECK NUMBER 2050864 1 5 @39
AAI PAYABLES
P.O. Box 102776
Anchorage, AK 99510-2776
PAY
TO THE
ALASKA DEPT OF REVENUE :
ORDER OF:
ALASKA OIL & GAS:CONSERVATION COMMI
3001 PORCUPINE DRIVE
:
The First NatiOnal Bank of Chicago-0710
Chicago, Illinois
Payable Through Republic Bank
Shelbyville, Kentucky
NOVEMBER 4, 1998
*** 'VOID AFTER 90 DAYS
: :
i :. . ~ ' EXACTLY *********** 100. DOLLARS AND O0 CENTS.,~***
0997579
,100.00
TRACE NUMBER: 205086415
FIELD 8, POOL .............
ADMINISTRATION 1.
INIT CLASS
ENGINEERING
P~ DATE
__
WELL NAME ,,~_.~//.,~-"4::~/'/~ PROGRAM: exp [] dev~;J' redrl_.~lC'serv [] wellbore seg II ann. disposal para req, !
/"~?_~/ GEOL AREA ..... ~:::) uNI-I"#. ///~('.,> __. ON/OFF SHORE ~ .......
Permit fee attached .......................
2. Lease number appropriate ...................
3~ Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well Iocaled proper dislance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficienl acreage available in drilling unil ............
8. If deviated, is wellbore plat included ...............
9. Operalor only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued withoul conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
N
N
N
Y N
(~N
(~N
Y N
~N
~N
N
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMl- vol adequate to circulate on conductor & surf csg
17. CM I- vol adequale to tie-in long string to surf csg ........
18. CMl' will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to ,~C~c:x-,,, psig.
27, Choke manifold complies w/APl RP-53 (May 8~' ........
28. Work will occur without operation shutdown ........... ~ N
29. Is presence of H2S gas probable .................
N
30. Permit can be issued w/o hydrogen sulfide measures ..... Y N/Y N --' '"
31.
Data
presenled on potential overpressure zones ....... Y/N" ,,~ j _,~
32. Seismic analysis of shallow gas zones. ' ~y ~1,/'~.,-/, ~,
33. Seabed condition survey (if off-shore) .............
weekly progress reports ....... ,,/ Y N
GEOLOGY
AP__~R D/~TE/ 34. Contact name/phone for
ANNULAR DISPOSAL 35. With proper cementing records, this~Dl~
(A) will contain wasJke' in a suita~eceiving zone; .......
APPR DATE (B) will not contamim~.~..fre~Ywater; or cause drilling waste...
to,.surface; ~ _ _
(C) will'~bt'impair.~hanical~f the well used for disposal;
(F)) will not da~e producing formation~r-'im~L~covery from a
.................... pool;
(E) will not circurnve, nt 20 AAC 25.252 or 20,,,AAC 25.412.
, , ,
GEOLO,,GY: coMMIssION:
ENGINEERING: ~ar
BEW~¢~ '(/~,.~ WM / -
JDH ,.--'"'t_-.-- /
Y N
Y N
Y N
Y N
DWJ~ ~.. ,,~
RNC. '~. ~
co ,'~/~-N¢ -
Comments/Instructions:
M chekhsl ~ev 05129198
Well Histo.ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
T° improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
No special'effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Wed Jan 12 17:05:59 2000
Reel Header
Service name ............. LISTPE
Date ..................... 00/01/12
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 00/01/12
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Kuparuk
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPER3XTOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPEP~ATOR WITNESS:
MWD RUN 2
AK-MM-90198
J. MARTIN
M. WINFREE
1R-01a
500292140401
ARCO Alaska, Inc.
Sperry Sun
12-JAN-00
RECEIVED
2000
MWD RUN 3
AK-MM-90198
J. PAINTER
G. WHITLOCK
MWD RUN 4
AK-MM-90198
P. SMITH
GUY WHITLOCK
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
MWD RUN 5
AK-MM-90198
T. MCGUIRE
G. WHITLOCK
12
10
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
154
139
.00
79.90
45.20
REMARKS:
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6.188 16.000 115.0
6.188 9.625 4380.0
6.188 7.000 6479.0
1. ALL DEPTHS ARE MEASURED DEPTHS UNLESS OTHERWISE
NOTED.
2. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED.
3. MWD RUNS 2-5 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC
WAVE RESISTIVITY
PHASE-4 (EWR4) .
4. DIGITAL DATA IS DEPTH CORRECTED TO THE PUC GR LOG
(FUN GR OF 08/26/85) WITH
KBE = 82' A.M.S.L. KICKOFF POINT FOR THIS WELLBORE
IS 6479'MD, 5315'TVD
(TOP OF WHIPSTOCK).
5. MWD RUNS 1-5 REPRESENT WELL 1R-01A WITH API#:
50-029-21404-01.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 12171'MD,
6678'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA PAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(EXTRA-SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE N-UMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SIIMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 6464.5 12127 0
RPD 6470 5 12133 5
RPM 6470 5 12133 5
RPS 6470 5 12133 5
RPX 6470 5 12133 5
ROP 6509 0 12171 0
FET 6566 0 12133 5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
6464 5
6469 0
6470 5
6472 0
6475 0
6479 5
12171 0
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
REMARKS:
GR
6464 0
6468 5
6471 5
6473 0
6476 0
6480 0
12171 5
EQUIVALENT UNSHIFTED DEPTH
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Al~sent value ...................... -999
MERGED MAIN PASS.
$
BIT RUN NO MERGE TOP MERGE BASE
200 6518.0 6603.0
300 6603.0 7128.0
400 7128.0 7827.0
500 7827.0 12171.0
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units
DEPT FT
ROP MWD FT/H
GR MWD API
RPX MWD OHMM
RPS MWD OHMM
RPM MWD OHMM
RPD MWD OHMM
FET MWD HOUR
Size Nsam Rep Code Offset Channel
4 1 68 0 1
4 1 68 4 2
4 1 68 8 3
4 1 68 12 4
4 1 68 16 5
4 1 68 20 6
4 1 68 24 7
4 1 68 28 8
Name Service Unit Min Max
DEPT FT 6464.5 12171
ROP MWD FT/H 0 2717.72
GR MWD API 25.27 525.81
RPX MWD OHMM 0.06 1449.23
RPS MWD OHMM 0.06 968.32
RPM MWD OHMM 0.43 2000
RPD MWD OHMM 0.2 2000
FET MWD HOUR 0.11 25
Mean Nsam
9317.75 11414
63.8434 11325
83.3606 11326
20.515 11327
22.6187 11327
28.9083 11327
33.981 11327
1.71766 11136
First
Reading
6464.5
6509
6464.5
6470.5
6470.5
6470.5
6470.5
6566
Last
Reading
12171
12171
12127
12133.5
12133.5
12133.5
12133.5
12133.5
First Reading For Entire File .......... 6464.5
Last Reading For Entire File ........... 12171
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
R_AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMNLARY
VENDOR TOOL CODE START DEPTH
GR
RPX
RPS
RPM
RPD
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
6464 0
6471 0
6471 0
6471 0
6471 0
6509 5
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
6559 0
6566 0
6566 0
6566 0
6566 0
6603 0
30-NOV-99
Insite
0.41
Memory
6606.0
42.0
42 .0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA P~AY
EWR4 ELECTROMAG. RESIS. 4
$
TOOL NUMBER
P1385GR4
P1385GR4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.188
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPEP~ATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTP~ATE AT MT:
MUD CAKE AT MT:
Water Based
10.90
47.0
8.5
500
4.0
1.900
1.460
1.700
2.100
78.0
103.4
78.0
78.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STA_N/DOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 2 FT/H 4 1 68 4 2
GR MWD 2 API 4 1 68 8 3
RPX MWD 2 OHMM 4 1 68 12 4
RPS MWD 2 OHMM 4 1 68 16 5
RPM MWD 2 OHMM 4 1 68 20 6
RPD MWD 2 OHMM 4 1 68 24 7
Name Service Unit Min Max
DEPT FT 6464 6603
ROP MWD 2 FT/H 0 1898.27
GR MWD 2 API 53.83 98.73
RPX MWD 2 OHMM 0.06 1449.23
RPS MWD 2 OHMM 0.06 968.32
RPM MWD 2 OHMM 0.43 2000
RPD MWD 2 OHMM 0.2 2000
Mean Nsam
6533.5 279
96.5141 188
77.6918 191
19.4367 191
13.1296 191
114.756 191
66.4191 191
First
Reading
6464
6509.5
6464
6471
6471
6471
6471
Last
Reading
6603
6603
6559
6566
6566
6566
6566
First Reading For Entire File .......... 6464
Last Reading For Entire File ........... 6603
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 6560 5
FET 6566 5
RPX 6567 5
RPD 6567 5
RPM 6567 5
RPS 6567 5
ROP 6603 5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MI/D PH:
MUD CHLORIDES (PPM) :
STOP DEPTH
7088 5
7095 5
7095 5
7095 5
7095 5
7095 5
7131 5
02-DEC-99
Insite
0.41
Memory
7128.0
13.5
42.1
TOOL NUMBER
P1385GR4
P1385GR4
6.188
Water Based
10.90
45.0
9.0
50O
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPER3tTURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
4.4
2.000
1.510
1.700
2.200
76.0
102 . 8
76.0
76.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 3 FT/H 4 1 68 4 2
GR MWD 3 API 4 1 68 8 3
RPX MWD 3 OHMM 4 1 68 12 4
RPS MWD 3 OHMM 4 1 68 16 5
RPM MWD 3 OHMM 4 1 68 20 6
RPD MWD 3 OHMM 4 1 68 24 7
FET MWD 3 HOUR 4 1 68 28 8
Name Service Unit
DEPT FT
ROP MWD 3 FT/H
GR MWD 3 API
RPX MWD 3 OHMM
RPS MWD 3 OHMM
RPM MWD 3 OHMM
RPD MWD 3 OHMM
FET MWD 3 HOUR
Min
6560.5
1.05
42 47
1 04
1 02
0 98
1 O9
0 11
Max Mean Nsam
7131.5 6846 1143
130.26 58.483 1057
158.96 109.206 1057
10.14 2.15072 1057
9.63 2.1209 1057
8.33 2.09505 1057
5.5 2.1143 1057
4.38 1.45416 1059
First
Readinc
6560
6603
6560
6567
6567
6567
6567
6566
Last
Readin~
7131 5
7131 5
7O88 5
7095 5
7095 5
7095 5
7095 5
7095 5
First Reading For Entire File .......... 6560.5
Last Reading For Entire File ........... 7131.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NI/MBER: 4
P_AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 7089 0 7784 5
FET 7096 0 7791 5
RPX 7096 0 7791 5
RPS 7096 0 7791 5
RPD 7096 0 7791 5
RPM 7096 0 7791 5
ROP 7132 0 7827 5
$
LOG HEADER DATA
DATE LOGGED: 04-DEC-99
SOFTWAiqE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 0.41
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT) : 7827.0
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 17.8
MAXIMUM ANGLE: 43.9
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPEP~ATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units ........................
Datum Specification Block sub-type...0
TOOL NUMBER
P1385GR4
P1385GR4
6.188
Water Based
10.90
43.0
9.0
450
4.4
1.800
1.170
1.700
2.100
74.0
116.6
74.0
74.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 4 FT/H 4 1 68 4 2
GR MWD 4 API 4 1 68 8 3
RPX MWD 4 OHMM 4 1 68 12 4
RPS MWD 4 OHMM 4 1 68 16 5
RPM MWD 4 OHMM 4 1 68 20 6
RPD MWD 4 OHMM 4 1 68 24 7
FET MWD 4 HOUR 4 1 68 28 8
Name Service Unit
DEPT FT
ROP MWD 4 FT/H
GR MWD 4 API
RPX MWD 4 OHMM
RPS MWD 4 OHMM
RPM MWD 4 OHMM
RPD MWD 4 OHMM
FET MWD 4 HOUR
Min
7089
0 77
46 68
0 81
0 76
0 76
0 79
0 52
Max
7827.5
222 84
525 81
6 36
5 07
4 83
4 36
19 29
Mean Nsam
7458.25 1478
61.3444 1392
163.295 1392
1.97998 1392
1.95557 1392
1.94231 1392
1.97404 1392
1.97874 1392
First
Reading
7089
7132
7089
7096
7096
7096
7096
7096
Last
Reading
7827 5
7827 5
7784 5
7791 5
7791 5
7791 5
7791 5
7791 5
First Reading For Entire File .......... 7089
Last Reading For Entire File ........... 7827.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535 '
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 7785.0
RPD 7792.0
RPM 7792.0
RPS 7792.0
RPX 7792.0
FET 7792.0
ROP 7828.0
$
STOP DEPTH
12127.5
12134 0
12134 0
12134 0
12134 0
12134 0
12171 5
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STA/~DOFF (IN) :
EWR FREQUENCY (HZ) :
REMJARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
12-DEC-99
Insite
0.41
Memory
12171.0
47.3
98.1
TOOL NUMBER
P1376GR4
P1376GR4
6.188
Water Based
11.00
41.0
8.5
5O0
2.5
2.000
1.940
1.450
2.500
68.0
156.0
68.0
68.0
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEFT FT 4 1 68 0 1
ROP MWD 5 FT/H 4 1 68 4 2
GR MWD 5 API 4 1 68 8 3
RPX MWD 5 OHMM 4 1 68 12 4
RPS MWD 5 OHMM 4 1 68 16 5
RPM MWD 5 OHMM 4 1 68 20 6
RPD MWD 5 OHMM 4 1 68 24 7
FET MWD 5 HOUR 4 1 68 28 8
Name Service Unit Min Max
DEFT FT 7785 12171.5
ROP MWD 5 FT/H 0 2717.72
GR MWD 5 API 25.27 133.53
RPX MWD 5 OHMM 2.84 111.07
RPS MWD 5 OHMM 2.82 99.74
RPM MWD 5 OHMM 2.78 1951.84
RPD MWD 5 OHMM 2.88 2000
FET MWD 5 HOUR 0.54 25
Mean Nsam
9978.25 8774
64.189 8688
67.5292 8686
25.748 8685
28.6381 8685
34.7777 8685
42.098 8685
1.70794 8685
First
Reading
7785
7828
7785
7792
7792
7792
7792
7792
Last
Reading
12171.5
12171.5
12127.5
12134
12134
12134
12134
12134
First Reading For Entire File .......... 7785
Last Reading For Entire File ........... 12171.5
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/01/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 00/01/12
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 00/01/12
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKI~OWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File