Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
199-121
XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE RESCAN Complete Color items - Pages: Grayscale, halftQ,ge,s,?~ictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DA,~" ~ Diskettes, No.o~ [] Other, No/Type OVERSIZED ~- c~Logs of various kinds [] Other COMMENTS: Scanned by: Beverly Dianna Nathan Lowell Date:3[ ,~0 [] TO RE-SCAN Notes: Re-Scanned by: Be~,erly Dianna Vincent~Lowell Date: ~'~/,'~'? Is' ~ UNSCANNED, OVERSIZED MATERIALS AVAILABLE: ~aJ FILE # To request any/alI of the above information, please contact: Alaska Oil & Gas Conservation Commission ~ 333 W. 7th Ave., Ste. 100 Anchorage, Alaska 99501 Voice (907) 279-1433 FFax (907) 276-7542 Permit to Drill No. 1991210 DATA SUBMITTAL COMPLIANCE REPORT 3/21/2002 Well Name/No. WEST GWYDYR I Operator BP EXPLORATION (ALASKA) INC AP! No. 50-029-22954-00-00 MD 11030 TVD 10513 REQUIRED INFORMATION DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital T/pe Media Format D Completion Date 2/18/2000 Completion Status P&A Mud Log No Samples No -- Log Log Rnn ~me~ Scale Media No '~ SRVY RPT LL/""~H'DILIMACICZDLICN-' 25 1,2 cL~DGR/EWR-TVD 25 FINAL MAC 5 1,2 ,L..//"'H DIL· 2 1,2 R-""~WELL RPT 2 MUD 2 FINAL .r · L~.i.. SSTVD 1 1,2 t,_v/" DGR/EWR-MD . 25 FINAL ~//DDL 2 FINAL ~,L-'/' CZDL/CNL 2 1,2 pL// DIGITAL SPECTRAL 5 1,2 Well Cores/Samples hfformation: Interval Start Stop 0 11030 140 11000 63 10473 140 11000 3500 11000 70 11030 140 63 7O 35OO 3386 11000 10997 11030 11000 10913 OH / CH OH OH O OH OH OH OH OH O O O OH OH OH OH OH . Current Status P&A UIC N Directional Survey No (data taken from Logs Portion of Master Well Data Maint) Received 3/24/2000 3/24/2000 4~/2000 3/24/2000 3/24/2000 3/24/2000 4~/2000 4~/2000 3/24/2000 4~/2000 3/24/2000 3/24/2000 3/24/2000 4~/2000 3/24/2000 3/24/2000 Dataset Number Commcnts SPERRY . 09520,--"~'70_11030 EPOCH 1/28/00 THRU EPOCH BL(C) 09522,,----~'63_10997 09482',-,"'" 8400-11000 09484 140-11000 EPOCH Interval Start Stop ....... Sent . . \ '.:4:. ~.,..~,.. 600 11030 %~,,, ~ , Received Dataset Numbe~,~.(~omments 1025 ADI)ITIONAL INFORMATION Permit to Drill No. 1991210 DATA SUBMITTAL COMPLIANCE REPORT 3/21/2002 Well Name/No. WEST GWYDYR I Operator BP EXPLORATION (ALASKA) INC APl No. 50-029-22954-00-00 MD i 1030 TVD 10513 Well Cored? Y / H Comments: Compliance Reviewed By: Completion Date 2/18/2000 .. Completion Status P&A Daily History Received? Formation Tops Receuived? Current Status ~/'~ / N P&A Date: UIC N MEMORANDUM TO: THRU: FROM: State of Alaska Alaska Oil and Gas Conservation Commission Dan Seamount, Commissioner Blair Wondzell, P. I. Supervisor Chuck Schev~, Petroleum Inspector DATE: August 10, 2000 SUBJECT: Location Clearance West Gwydyr #1 PTD #199-121 Thursday, August 10, 2000; I made a Location Clearance Inspection on the abandoned exploratory well West Gwydyr~l. I was accompanied today by Scott Grieve (BPX) and Ned Arey (North Slope Borough). We flew to the location via Air Logistics helicopter West Gwydy~l was drilled and abandoned this last winter exploratory season. We circled the location several times at a Iow altitude before landing. Other than the mound of clean gravel over the cellar there were no indications of any drilling activity at this location. A walk around the area revealed a small oily spot (approximately l-foot square) on the tundra. This oily spot was roughly 100 yards from the well cellar in the direction of the ice road. Mr. Grieve indicated BPX would get this spot cleaned up. We flew the ice road path this was clean and seemed well vegetated. I recommend this location be approved for final clearance. SUMMARY: I made a Location clearance inspection of the West Gwydyr #1 Well site. No major problems were observed, Attachments: Loc. Clear West Gwydyr #1 8-10-00 CS.xls NON-CONFIDENTIAL Loc Clear West Gwydyr .doc BP Exploration (Alaska), Inc. Attn: Howard Oldand State of Alaska AK Oil & Gas Conservation Comm. 3001 Porcupine Drive Anchorage, Alaska 99502 Trans# 91323 Date: 04/04/2000 WGWYDYR-01 Digital Well Log Data Enclosed are the materials listed below. If you have any questions please contact me in the PDC at (907) 564-5929 SW Name Rec Date Record Type Company Version WGWYDYR-01 Feb 11-16 2000 CD ROM Baker Atlas Final Composite Log type HDIL,MAC,CN,ZDL,SL (LIS FORMAT) ~l~~rn one copy of this transmittal. Thank You David W. Douglas Petrotechnical Data Center APR 0 4 2000 AJaska Oil & Gas Cema. Commission Anchorage Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. P.O Box 196612, Anchorage, AK 99519-6612 BP Exploration (Alaska), Inc. Attn: Howard Okland State of Alaska AK Oil & Gas Conservation Comm. 3001 Porcupine Drive Anchorage, Alaska 99502 Enclosed are the materials listed below. Trans# 91292 Date: 04/03/2000 WGWYDYR-01 Mud Log Data If you have any questions please contact me in the PDC at (907) 564-5929 S W Name WGWYDYR-01 WGWYDYR-01 WGWYDYR-01 WGWYDYR-01 Rec Date Record Type dan28-Feb142000 OH MUDLOG -v Jan28-Feb142000 OH MUDLOG '-- Jan28-Feb152000 WELL REPORT ~ Jan28-Feb142000 DISKETTE ~ Company Version EPOCH Final EPOCH Final EPOCH Final EPOCH Final Log type MUDLOG (FORMATION LOG) MUDLOG (DRILLING DYNAMICS LOG) FINAL WELL REPORT BINDER MUDLOG and DRILLING (ASCII FORMAT) Please Sign and return one copy of this transmittal. Thank You, David W. Douglas Petrotechnical Data Center ,"-:.?~ 0 4 2.000 ~Jaska Ofl & Gas Cons. Commis~io~ Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. P.O Box 196612, Anchorage, AK 99519-6612 BP Exploration (Alaska), Inc. Attn: Howard Okland State of Alaska AK Oil & Gas Conservation Comm. 3001 Porcupine Drive Anchorage, Alaska 99502 Trans# 91285 Date: 03X23X2000 WGWYDYR-01 Well Log Data & Directional Survey Data Enclosed are the materials listed below. If you have any questions please contact me in the PDC at (907) 564-5929 SW Name Rec Date Record Type Company Log Version WGWYDYR-01 Jan27 -Feb16 2000 OH MWD LOG Sperry Sun Final WGWYDYR~01 Jan27 -Feb16 2000 OH MWD LOG Sperry Sun Final WGWYDYR-01 Jan28 -Feb16 2000 DISKETTE Sperry Sun Final WGWYDYR-01 Jan28-Feb16 2000 REPORT Sperry Sun Final WGWYDYR-01 Jan28 -Feb16 2000 DISKETTE Sperry Sun Final WGWYDYR-01 Jan28 -Feb16 2000 REPORT Sperry Sun Final Log type t~I~,DGR,EWR (MD) ~ ..__~P,DGR,EWR (TVD) ~ ~RO"P,DGR,EWR (LDWG-LIS FORMAT) Cfl:IOP,DGR,EWR (LDWG-LIS LISTING) t. JV~/D DIRECTIONAL SURVEY (ASCII) /~M_WD DIRECTIONAL SURVEY REPORT Please Sign and retum one copy of this transmittal. Thank You, David W. Douglas Petrotechnical Data Center RECEIVED MAR 2 4 2.000 ~aska Oil & Gas Cons. Commission Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. P.O Box 196612, Anchorage, AK 99519-6612 --- STATE OF ALASKA - - ALAS OIL AND GAS CONSERVATION CC 41SSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG CONFIDENTIAL 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 199-121 300-043 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 i"~;:ii:-,.? 'i'¥i":i'-' 'i 50-029-22954-00 4. Location of well at surface 9. Unit or Lease Name 3509' NSL, 5066' WEb, SEC. 04, T12N, R12E, UM At top of productive interval~ :~..:,_¢ ~- ,~:,. ~ ,~ ~,,_..,._ _ , Exploration N/A 'ii'_~- West Gwydyr #1 At total depth :.;."--'i i 10. Well Number 110' NSL, 5262' WEb, SEC. 32, T13N, R12E, UM 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and--~Serial No. Prudhoe Bay Field / Undefined Pool KBE = 52.70' AMSL ADb 028234 12. Date Spudded 1/28/2000 i 13' Date T'D' Reached !14' Date c°mp'' Susp'' °r Aband'2/14/2000 2/18/2000 115' water depth' if °ffsh°re N/A M SL 116' N°' °f C°mpleti°ns Zero 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) i 19. Directional Survey ! 20. Depth where SSSV set1 21. Thickness of Permafrost 11030 10513 FTI 11030 10513 FTI []Yes •No! N/AMDI 1900'(Approx.) 22. T~'~e Electric or Other Log~ Run MWD, DIP, GR, RES, HDIL, MAC, ZDL, LN, CDL, CNL, DLL, MLL 23. CASING, LINER AND CEMENTING RECORD CASING SET-f'ING DEPTH HOLE SIZE WT. PER FT. GRADE ToP BOSOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 80' 30" ;~60 SXArctic set (Approx.) 10-3/4" 45.5# L-80 29' 3533' 13-1/2" 745 sx Permafrost, 280 sx Class 'G' ,, 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None N/A MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10450' 1st P&A with 60 Bbls Class 'G' 3391 ' EZSV at 3443', 2nd P&A, 25 Bbls Cmt. Test to 3000 psi 40' 3rd P&A with 20 Bbls Cement 5' 4th P&A with 7 Bbls AS I Cement 27. PRODUCTION TEST Date First- Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A :Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing ;Casing Pressure CALCULATED OIL-BBb GAS-MCF WATER-BBb OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE ,,, 28. CORE DATA '"Brief descriptiOn of lithology, porosity, fractures, apparent dips and presence of oS'l, gas or water. Submit core chips. RECEIVED 0 MAP, ?..b ?.000 Alaska Oil & Gas Cons. (.;ommissior, Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. SV3 2665' 2665' UG4 3663' 3663' Top HRZ 7429' 7337' Base HRZ 7731' 7584' Top Kuparuk 7890' 7717' LCU 8313' . 8072' Top Miluveach 8713' 8408' Top Sag River 10641' 10141' Top Shublik 10697' 10194' RECEIVED Top Shublik 'B' 10774' 10268' MAR 2 3; 2.000 Top Shublik 'C' 10788' 10281' Alaska 0il & Gas Cons. Top Sadlerochit 10817' 10309' Anchorage 31. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerdeHubble ~'~~ _~~ Title Technical Assistant III Date West Gwydyr #1 199-121 300-043 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No./Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Sheet1 West Gwydyr #01 Formation Tops Marker MD (ff.) TVDBKB (ff.) TVDSS (ff.) T. Ugnu 3663 3663 3610 T. West Sak 5050 5050 4997 T. HRZ 7429 7337 7284 B. HRZ 7731 7584 7532 T. Kuparuk 7890 7717 7664 T. LCU 8313 8071 8068 T. MLV 8713 8408 8264 T. Kingak 9284 8901 8848 T. Sag 10641 10141 10088 T. Shublik 10697 10194 10142 T. SAD 10817 10309 10257 RECEIVED '-,:-? 2 4 ~OOO Alaska ~i & Gas Cons. Commission Anc~0r~e Page 1 Operator BP Exploration Performance Enquiry Report Date 01:l l,16 Feb 00 West Gwydyr #1 - Formation Integrity Test CONFtOENTI L Page I The analysis is from - 22:00, 01 Feb 00 - to - 22:00, 01 Feb 00 Programs in Result Table: Well Type Time From Time To Duration Event 22:00, 01 Feb 00 22:00, 01 Feb 00 Description E.M.W. (equivalent mud weight) Obtained leak off 16.1 Depth MDR Hole Size MDR 4033.0 9-7/8 RECEIVED ~.~.AR 2 5 Alaska Oil & Gas Cons. Commission Aachorage Progress Report CONFIDENTIAL Facility Gwydyr Bay Ice Well WGwyder01 Page 1 Rig Nabors 7ES Date 21 February 00 Date/Time 25 Jan O0 12:00-06:00 12:00-15:30 15:30 15:30-19:00 19:00 19:00-21:30 21:30 21:30-06:00 21:30-06:00 26 Jan 00 06:00-02:30 06:00-08:00 08:00 08:00-17:00 17:00 17:00-00:00 27 Jan 00 00:00 00:00-00:30 00:30 00:30-02:30 02:30 02:30-06:00 02:30-06:00 06:00-12:00 06:00-12:00 12:00 12:00-17:30 12:00-17:00 Duration 18hr 3-1/2 hr 3-1/2 hr 2-1/2 hr 8-1/2 hr 8-1/2 hr 20-1/2 hr 2hr 9 hr 7hr 1/2 hr 2hr 3-1/2 hr 3-1/2 hr 6hr 6 hr 5-1/2 hr 5hr Activity Move rig Rigged down Drillfloor / Derrick Prep rig for derrick down rig move. Bridle up, lower pipe chute, lower derrick. Equipment work completed Rig moved 5.00 % Moved complexes off D-12. Moved to end of pad. Rig off station Rig waited: Production facilities Electrical power disruption at GC1. CPS had orders to stop rig from crossing under power line. Made appropriate contacts, OK'd to cross with visual inspection. Resumed operations Rig moved 85.00 % Finished move sub base onto Gwydyr location. Rig moved 85.00 % Moved all complexes in convoy to Gwydyr location. All modules on location except sub base at report time. Move rig (cont...) Rig moved 95.00 % (cont...) Moved all complexes in convoy to Gwydyr location. All modules on location except sub base at report time. Began precautionary measures Rig moved 100.00 % Set mats, lay herculite. Spot pits, camp, shop. Berm and trim excess herculite. At well location - Exploration well Rigged up Drillfloor / Derrick Prepare and raised derrick. Raised pipe chute and hooked up mud lines. Unbridle. Equipment work completed Held safety meeting Held pre-spud safety and environmental meeting. Completed operations Rigged up Top drive R/U top drive, rig floor. Hang bridal lines. Equipment work completed Nipple up Divertor Installed Divertor NFLI divertor and divertor line. Take on water into the pits. Rig accepted 0230 hrs 1/27/2000. Fluid system Fill pits with Water R E ¢ E IV Finish fill pits with water and mix spud mud. Cont'd berming back of rig, end of divertor, mud ~'~AF~ ~. 0 storage, cuttings tank. Completed operations Nipple up Divertor Alaska ()il & Gas Cons. C Installed Flowline Anch0rag0 Install riser and flow line on divertor. Hook up hydraulic control lines. Cont rig up rig floor. 'D ommi~o_n_ Progress Report CONFIDENTIAL Facility Gwydyr Bay Ice Well WGwyder01 Rig Nabors 7ES Page 2 Date 21 February 00 Date/Time 28 Jan 00 29 Jan 00 30 Jan 00 17:00 17:00-17:30 17:30 17:30-18:30 17:30-18:30 18:30 18:30-20:30 18:30-20:30 20:30 20:30-03:30 20:30-01:30 01:30 01:30-03:30 03:30 03:30-05:30 03:30-05:30 05:30 05:30-06:00 05:30-06:00 06:00-06:00 06:00-06:00 06:00-06:00 06:00-06:00 06:00-15:30 15:30 15:30-16:00 16:00 16:00-17:00 17:00 17:00-18:00 18:00 18:00-06:00 18:00-06:00 06:00-01:00 06:00-13:30 Duration 1/2 hr lhr lhr 2hr 2hr 7hr 5hr 2hr 2hr 2hr 1/2 hr 1/2 hr 24 hr 24 hr 24 hr 24 hr 9-1/2 hr 1/2 hr lhr lhr 12hr 12hr 19hr 7-1/2 hr Activity Equipment work completed Held safety meeting Held pre-spud safety environmental meeting with crew #2. Completed operations Test well control equipment Tested Divertor Perform function test of divertor and accumulator. Test witnessed by J. Crisp, AOGCC. Function test completed satisfactorily Move rig Rigged up Drillstring handling equipment Prepare to P/U drill pipe. Finish berm under pipe shed. Equipment work completed 5in. Drillpipe workstring run Ran Drillpipe to 3255.0 ft (5in OD) P/U and stand back in derrick drill pipe required for surface hole. Stopped · To change handling equipment Ran HWDP to 709.0 ft (5in OD) PFU and stand back HWDP. Stopped · To change handling equipment BHA run no. 1 Made up BHA no. 1 Set motor to 1.15 deg. BHA no. 1 made up Fluid system Circulated at 80.0 ft Fill hole and check for leaks. Prepare to spud at report time. BHA run no. 1 Drilled to 1225.0 ft ART= 19 hrs AST= 1.25 hfs Drilled to 1225.0 ft ART= 7.5 hrs AST= 0.75 hrs BHA run no. 1 (cont...) Drilled to 1857.0 ft (cont...) ART= 7.5 hrs AST= 0.75 hrs Stopped · To circulate Circulated at 1857.0 ft Obtained bottoms up (100% annulus volume) Pulled out of hole to 201.0 ft At BHA R.I.H. to 1857.0 ft On bottom Drilled to 2875.0 ft ART= 6.0 hrs Drilled to 2875.0 ft Drilled f/1857' to 2875'. ART=9.5 AST=0 Drilling ahead at report time. No hole problems. BHA run no. 1 (cont...) Drilled to 3548.0 ft (cont...) RECEIVE MAR 2 Alaska Oil & Gas Cons. Anchorage D ]mission Progress Report CONFIDENTIAL Facility Gwydyr Bay Ice Well WGwyder01 Page 3 Rig Nabors 7F.S Date 21 February 00 Date/Time 31 Jan 00 Duration 13:30 13:30-14:30 1 hr 14:30 14:30-17:00 2-1/2 hr 17:00 17:00-18:00 1 hr 18:00 18:00-20:00 2 hr 20:00 20:00-20:30 1/2 hr 20:30 20:30-22:30 2 hr 22:30 22:30-01:00 2-1/2 hr 01:00 01:00-06:00 5 hr 01:00-04:00 3 hr 04:00 04:00-06:00 2 hr 04:00-06:00 2 hr 06:00-14:30 8-1/2 hr 06:00-12:30 6-1/2 hr 12:30 12:30-14:30 2hr 14:30 14:30-20:30 6 hr 14:30-15:00 1/2 hr 15:00 15:00-17:00 2hr Activity Drilling ahead at report time. No hole problems. Reached planned end of run - Section / well T.D. Circulated at 3548.0 ft Obtained bottoms up (100% annulus volume) Pulled out of hole to 201.0 ft POH slow. Tight first 5 stds. Worked thru tight spots. At BHA R.I.H. to 3548.0 ft No problems RIH. On bottom Circulated at 3548.0 ft Obtained clean returns - 150.00 % hole volume Dropped EMSS survey barrel Survey barrel on bottom at 3311.0 ft Pulled out of hole to 201.0 ft At BHA Pulled BHA BHA Laid out Run Casing, 10-3/4in O.D. Rigged up Casing handling equipment Install long bales. RFLI casing slips and elevators. Equipment work completed Ran Casing to 86.0 ft (10-3/4in OD) Held PJSM. P/U float jts. M/U Franks circulating tool at report time. Ran Casing to 86.0 ft (10-3/4in OD) Finished run 85 jts 10 3/4", L-80, BTC-MOD casing. Landed on mandrel hanger. Up=175K Down=135K Run Casing, 10-3/4in O.D. (cont...) Ran Casing to 3533.0 ft (10-3/4in OD) (cont...) Finished run 85 jts 10 3/4", L-80, BTC-MOD casing. Landed on mandrel hanger. Up=175K Down=135K Hanger landed Circulated at 3533.0 ft Circ and cond mud. Obtained clean returns - 200.00 % hole volume Cement: Casing cement Held safety meeting Pre-job safety and environmental meeting. Completed operations Mixed and pumped slurry - 589.000 bbl Pmp 10 bbls H20, test lines to 3500 psi. Pmp btm plug w/10 bbls H20. Pmp 75 bbls spacer @ 10.5 ppg. Pmp 589 bbls lead cmt @ 10.7 ppg. Cmt to surface. 17:00 17:00-18:30 1-1/2 hr RECEIVED Alaska 0il & Gas Cons. Commission Anch0rag0 Lead cement pumped Mixed and pumped slurry - 57.900 bbl Mix and pump 57.9 bbls tail cmt @ 15.8 ppg. Dropped top plug. Pumped 20 bbls H20 and 317 bbls mud. Bumped plug at calc'd strokes. Press to 3000 psi, OK. CIP 1745 hrs 1/31/00. Floats held OK. Full returns through out job. Facility Gwydyr Bay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENTIAL Page 4 Date 21 February 00 Date/Time t8:30 18:30-20:30 20:30 20:30-01:30 20:30-01:30 01 Feb00 01:30 01:30-02:30 01:30-02:30 02:30 02:30-05:30 02:30-05:30 05:30 05:30-06:00 05:30-06:00 05:30-06:00 06:00-09:00 06:00-08:45 08:45 08:45-09:00 09:00 09:00-20:30 09:00-10:30 10:30 10:30-14:00 14:00 14:00-16:30 16:30 16:30-17:30 17:30 17:30-18:30 18:30 18:30-20:15 20:15 20:15-20:30 Duration 2 hr 5 hr 5hr 1 hr lhr 3hr 3hr 1/2 hr 1/2 hr 1/2 hr 3hr 2-3/4hr 1/4 hr 11-1/2 hr 1-1/2 hr 3-1/2 hr 2-1/2 hr lhr lhr 1-3/4 hr 1/4 hr Activity Tail cement pumped Rigged down Casing handling equipment L/D cmt and csg handling equipt. L/D landing jt. Clear floor. Equipment work completed Nipple down Divertor Removed Divertor Flush riser and divertor. N/D divertor lines and Hydril. Clear cellar. Equipment work completed Wellhead work Rigged up Casing head N/U 13-5/8" split speed head. Tested to 1000 psi, OK. Equipment work completed Nipple up BOP stack Rigged up BOP stack N/U BOP's. Equipment work completed Test well control equipment Tested BOP stack P/U test plug and begin BOP test at report time. Tested BOP stack Test BOPE to 250 / 5000 psi; annular to 250 / 3500 psi. Test witnessed by Lou Grimaldi-AOGCC Field Inspector. Test well control equipment (cont...) Tested BOP stack (cont...) Test BOPE to 250 / 5000 psi; annular to 250 / 3500 psi. Test witnessed by Lou Grimaldi-AOGCC Field Inspector. Pressure test completed successfully - 5000.000 psi Installed Wear bushing Pull test plug. Set wear ring. Eqpt. work completed, running tool retrieved BHA run no. 2 Serviced Top drive Equipment work completed Made up BHA no. 2 MU BHA. Orient. Load MWD. BHA no. 2 made up Singled in drill pipe to 3445.0 ft Tag landing collar. D1 Drill-OS-1:20 min. 82 joints picked up Circulated at 3445.0 ft Obtained bottoms up (100% annulus volume) Tested Casing - Via string Test casing to 3500 psi f/30 min--OK. Pressure test completed successfully - 3500.000 psi Drilled installed equipment - Float collar Drill FC, cement, & FS. Drill old rat hole to 3548'. Completed operations Drilled to 3569.0 ft Drill 21' n~w hole. RECEIVE MAR 2 3 200C Alaska ()il & Gas Cons. Co~ Anchorage D nmissI0n Facility Gwydyr Bay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENTIAL Page 5 Date 21 February 00 Date/Time 02 Feb 00 03 Feb 00 04 Feb 00 20:30 20:30-22:00 20:30-21:00 21:00 21:00-22:00 22:00 22:00-00:30 22:00-00:30 00:30 00:30-06:00 00:30-06:00 00:30-06:00 06:00-06:00 06:00-10:00 10:00 10:00-10:30 10:30 10:30-11:30 11:30 11:30-12:30 12:30 12:30-13:30 13:30 13:30-06:00 13:30-06:00 06:00-06:00 06:00-01:00 01:00 01:00-02:00 02:00 02:00-02:30 02:30 02:30-02:45 02:45 02:45-04:00 Duration 1-1/2 hr 1/2 hr lhr 2-1/2 hr 2-1/2 hr 5-1/2 hr 5-1/2 hr 5-1/2 hr 24 hr 4hr 1/2 hr lhr lhr 1 hr 16-1/2 hr 16-1/2 hr 24 hr 19hr lhr 1/2 hr 1/4 hr 1-1/4 hr Activity Stopped: To perform FIT Perform integrity test Circulated at 3569.0 ft Obtained bottoms up (100% annulus volume) Performed formation integrity test Obtained leak off 16.1 ppg EMW Fluid system Circulated at 3543.0 ft Pump weighted spacer. Displace hole to 3% KC1 system @ 10.2 ppg. Clean under hakers & possum belly. Hole displaced with Water based mud - 100.00 % displaced BHA run no. 2 Drilled to 4033.0 ft D2 Drill-OS-1 min. Drilled to 4033.0 ft H2S Drill-OS- 1:05 min. BHA run no. 2 (cont...) Drilled to 4506.0 ft (cont...) H2S Drill-OS- 1:05 min. Started scheduled wiper trip: due to Footage drilled Circulated at 4506.0 ft CBU. Monitor well-OK. Blow down. Obtained bottoms up (100% annulus volume) Pulled out of hole to 3533.0 ft Hole in good shape. No drag or swabbing. At 10-3/4in casing shoe Serviced Top drive Serv top drive. Change out top drive saver sub. Equipment work completed Singled in drill pipe to 4506.0 ft No problems. Wash down last it. 31 joints picked up Drilled to 5727.0 ft D2 Drill-OS- 1:15 min. Drilled to 5727.0 ft Started KO @ 6105'. Fire Drills @ 1100 hrs-OS-l:10 min & 2230 hrs-OS- 1:15 min. BHA run no. 2 (cont...) Drilled to 6485.0 ft (cont...) Started KO @ 6105'. Fire Drills @ 1100 hrs-OS-l:10 min & 2230 hrs-OS- 1:15 min. Reached planned end of run - Maximum hours on bit Circulated at 6485.0 ft Pump Hi-Vis. Monitor well-OK. Obtained bottoms up (100% annulus volume) Pulled out of hole to 6000.0 ft Stopped: To circulate Circulated at 6000.0 ft Pump dry job. Heavy slug spotted downhole Pulled out of hole to 5413.0 ft Work tight spots @ 5820', 5500', & 5413'. RECEIV Alaska ()il & Gas Cons, Anchorage ED Facility Gwydyr Bay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENII/ L Page 6 Date 21 February 00 Date/Time 05 Feb 00 04:00 04:00-06:00 04:00-06:00 06:00-15:30 06:00-10:30 10:30 10:30-12:00 12:00 12:00-14:30 14:30 14:30-15:30 15:30 15:30-06:00 15:30-16:30 16:30 16:30-17:30 17:30 17:30-18:00 18:00 18:00-20:15 20:15 20:15-21:30 21:30 21:30-23:00 23:00 23:00-23:15 23:15 23:15-00:00 00:00 00:00-06:00 00:00-06:00 00:00-06:00 06:00-06:00 06:00-06:00 Duration 2hr 2hr 9-1/2 hr 4-1/2 hr 1-1/2 hr 2-1/2 hr 1 hr 14-1/2 hr lhr lhr 1/2 hr 2-1/4 hr 1-1/4 hr 1-1/2 hr 1/4 hr 3/4 hr 6hr 6hr 6hr 24 hr 24 hr Activity Observed 40.00 klb overpull Backreamed to 5050.0 ft Circ & backream out. Backreamed to 5050.0 ft Wash & backream to shoe. BHA run no. 2 (cont...) Backreamed to 3533.0 ft (cont...) Wash & backream to shoe. Stopped: To circulate Pulled out of hole to 914.0 ft Pump dry job. POH. Still dragging 5-10k. At BHA Pulled BHA Clear floor. BHA Stood back Downloaded MWD tool Completed operations BHA run no. 3 Made up BHA no. 3 Change out motor. Orient. Load MWD. BHA no. 3 made up Singled in drill pipe to 1942.0 ft D1 Drill-OS-l:05 min. 33 joints picked up R.I.H. to 3533.0 ft At 10-3/4in casing shoe Serviced Top drive Fill pipe. Test MWD. Service TD. Spill Drill-OS-45 sec. Equipment work completed Serviced Block line Cut drlg line. Spill Drill-OS-45 sec. Equipment work completed R.I.H. to 6393.0 ft Tight spot @ 5664'. Work spot out. Began precautionary measures Reamed to 6485.0 ft Wash & ream down last stand. On bottom Circulated at 6485.0 ft Circ Hi-Vis sweep. Hole swept with slug - 100.00 % hole volume Drilled to 6602.0 ft Bit balled on bottom. Pump sweeps & drill @ lite wt on bit to clean up. Drilled to 6602.0 ft Fire Drill-OS-1:30 min. Pumping Nutplug/SAPP sweeps in an attempt to keep bit unballed. Drilled to 6602.0 ft Lot of problems w/bit balling while sliding. Nutplug/SAPP sweeps seemed to help most. OK once rotating. H2S Drill-OS-2:30 min; D2 Drill-OS-45 sec. BHA run no. 3 (cont...) Drilled to 7150.0 ft (cont...) 311kllll~, RECEIVED ,MAR 2 5 200¢: Alaaka Oil & Gas Cor~s. uomm Anchorago i$i0n Progress Report CONFIDENTIAL Facility Gwydyr Bay Ice Well WGwyder01 Page 7 Rig Nabors 7ES Date 21 February 00 Date/Time 06 Feb 00 07 Feb 00 06:00-06:00 06:00-21:30 21:30 21:30-22:00 22:00 22:00-23:30 23:30 23:30-00:00 00:00 00:00-00:30 00:30 00:30-01:30 01:30 01:30-06:00 01:30-06:00 06:00-14:00 06:00-07:30 07:30 07:30-09:00 09:00 09:00-12:30 12:30 12:30-14:00 14:00 14:00-17:30 14:00-14:30 14:30 14:30-17:00 17:00 17:00-17:30 17:30 17:30-06:00 Duration 24 hr 15-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1/2hr 1 hr 4-1/2 hr 4-1/2hr 8hr 1-1/2 hr 1-1/2hr 3-1/2hr 1-1/2 hr 3-1/2hr 1/2hr 2-1/2hr 1/2hr 12-1/2 hr Activity Nutplug/SAPP sweeps seemed to help most. OK once BHA run no. 3 (cont...) Drilled to 7626.0 ft (cont...) Lot of problems w/bit balling while sliding. Nutplug/SAPP sweeps seemed to help most. OK once rotating. H2S Drill-OS-2:30 min; D2 Drill-OS-45 sec. Started scheduled wiper trip: due to Time elapsed Flow check Monitor well-OK. Blow down. Observed well static Pulled out of hole to 5200.0 ft POH above previous tight spot. No drag-no problems. At top of check trip interval R.I.H. to 5900.0 ft Began precautionary measures Circulated at 5900.0 ft Spot Nutplug / SAPP pill around bit & BHA. Rotate @ 100 rpm & reciprocate to cleanup bit. Broke circulation R.I.H. to 7626.0 ft RIH. Precautionary ream last stand to bottom. No problems. On bottom Drilled to 7665.0 ft D2 Drill-OS- 1 min. Drilled to 7665.0 ft Penetration dropped to -5 fph. BHA run no. 3 (cont...) Drilled to 7686.0 ft (cont...) Penetration dropped to -5 fph. ROP dropped from 20.0 ft/hr to 5.0 fi/hr - Bit balled up Circulated at 7686.0 ft Circ Hi-vis. Take two surveys. Monitor well-OK. Pump dry job. Blow down. Hole swept with slug - 100.00 % hole volume Pulled out of hole to 918.0 ft POH clean. Monitor well @ shoe. AtBHA RECEIV Pulled BHA Bit balled up across gauge & face. Two courses ,~fP,~ open. LD Motor. Download MWD. BHA Stood back Test well control equipment Installed BOP test plug assembly Pull wear ring & set test plug. Equipment work completed Tested BOP stack Test BOPE to 250 / 5000 psi; annular to 250 / 3500 psi. Tested choke manifold on trip out. Witnessing waived by John Spaulding-AOGCC Field Inspector. Pressure test completed successfully - 5000.000 psi Retrieved BOP test plug assembly Pull test plug & set wear ring. Equipment work completed BHA run no. 4 Alaska Oil & Gas Cons. C AnchoracJo D remission Facility Gwydyr Bay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENTIAL Page 8 Date 21 February 00 Date/Time 08 Feb 00 09 Feb 00 10 Feb O0 17:30-20:00 20:00 20:00-21:00 21:00 21:00-23:30 23:30 23:30~06:00 06:00-06:00 06:00-06:00 06:00-17:00 06:00-10:30 10:30 10:30-12:00 12:00 12:00-15:30 15:30 15:30-17:00 17:00 17:00-06:00 17:00-20:30 20:30 20:30-22:30 22:30 22:30-23:30 23:30 23:30-01:00 01:00 01:00-04:30 04:30 04:30-05:30 05:30 05:30-06:00 05:30-06:00 Duration 2-1/2 hr lhr 2-1/2 hr 6-1/2 hr 24 hr 24 hr llhr 4-1/2 hr 1-1/2 hr 3-1/2 hr 1-1/2 hr 13hr 3-1/2 hr 2hr lhr 1-1/2 hr 3-1/2 hr 1 hr 1/2 hr 1/2 hr Activity Made up BHA no. 4 Change out motor & MWD probe. Orient. D1 Drill-OS-45 sec. RIH. BHA no. 4 made up R.I.H. to 3533.0 ft Fill pipe. Check MWD. At 10-3/4in casing shoe R.I.H. to 7686.0 ft No problems RIH. Hole in good shape. Precautionary ream f/7620'-7686'. No fill. On bottom Drilled to 7900.0 ft Spill Drill-OS-1:30 min; D2 Drill-OS- 1 min. BHA run no. 4 (cont...) Drilled to 8377.0 ft (cont...) Spill Drill-OS-1:30 min; D2 Drill-OS-1 min. BHA run no. 4 (cont...) Drilled to 8471.0 ft (cont...) Spill Drill-OS-1:30 min; D2 Drill-OS-1 min. Reached planned end of run - Directional objective met Circulated at 8471.0 ft Survey & circ sweep. Hole swept with slug - 100.00 % hole volume Pulled out of hole to 913.0 ft Monitor well-OK. Pump dry job & blow down. POH. Work out tight spot @ 7524'. Monitor @ shoe-OK. At BHA Pulled BHA LD motor. Clear floor. Spill Drill-OS-1 min. BHA Stood back BHA run no. 5 Made up BHA no. 5 MU motor & orient. Down load MWD. Change out DM probe. Run BHA. BHA no. 5 made up Singled in drill pipe to 3473.0 ft PU additional 5" DP. At 10-3/4in casing shoe Serviced Top drive Service TD. Fill pipe. Check MWD. Equipment work completed Serviced Block line Cut & slip 61'. Blow down. Line slipped and cut R.I.H. to 8380.0 ft Fill pipe @ 6100'. Occasional tight spots f/7000' - 8380'. Began precautionary measures Washed to 8471.0 ft Wash & ream last stand. On bottom Drilled to 8471.0 ft Start drilling. Stop to thaw auger. Drilled to 8471.0 ft l-Jll[.l ~UUkl [IIIUH[II bgllU [11[.~11 31UWUU il'~ 3110.1[.~. 1¥1(1[11~ RECEIVE ,MAR Alaska Oil & Gas Cons. Anch0rag~ Facility Gwydyr Bay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENTIAL Page 9 Date 21 February 00 Date/Time 06:00-05:00 06:00-17:30 17:30 17:30-18:30 18:30 18:30-19:30 19:30 19:30-20:00 20:00 20:00 20:00-21:00 21:00 21:00-23:00 23:00 23:00-02:30 llFeb00 02:30 02:30-05:00 05:00 05:00-06:00 05:00-05:30 05:30 05:30-06:00 05:30-06:00 06:00-17:00 06:00-07:00 07:00 07:00-12:00 12:00 12:00-14:30 14:30 14:30-17:00 17:00 17:00-06:00 Duration 23 hr 11-1/2 hr lhr lhr 1/2 hr lhr 2 hr 3-1/2 hr 2-1/2 hr lhr 1/2 hr 1/2hr 1/2hr llhr lhr 5hr 2-1/2 hr 2-1/2 hr 13hr Activity several, various attempts to improve penetration, BHA run no. 5 (cont...) Drilled to 8780.0 ft (cont...) Drld good through sand then slowed in shale. Made several, various attempts to improve penetration, with no success. Spill Drill-OS-1 min; D2 Drill-OS- 1:05 min. ROP dropped from 100.0 ft/hr to 20.0 ft/hr - Bit quit Circulated at 8780.0 ft Monitor well-OK. Obtained bottoms up (100% annulus volume) Pulled out of hole to 7000.0 ft Pulled 15k-25k over f/-8600'-8100'. At top of check trip interval R.I.H. to 8170.0 ft Observed loss of 35.00 klb string weight Observed loss of 35.00 klb string weight Reamed to 8780.0 ft Wash & ream 7 stds to bottom. On bottom Circulated at 8780.0 ft Circ Hi-Vis sweep. Monitor well. Pump dry job. Hole swept with slug - 150.00 % hole volume Pulled out of hole to 913.0 ft POH clean. Monitor well @ shoe & BHA. LD 30jts DP. Derrick full w/112 stds 5" DP. At BHA Pulled BHA Download MWD. LD motor & MWD. Bit balled up BHA Stood back Electric wireline work Held safety meeting PJSM w/Baker Atlas. Completed operations Rigged up Logging/braided cable equipment RU loggers. Rigged up Logging/braided cable equipment Finish RU Baker Atlas. Electric wireline work (cont...) Rigged up Logging/braided cable equipment (cont...) Finish RU Baker Atlas. Work completed - Logging/braided cable equipment in position Conducted electric cable operations RIH w/HDIL/MAC/ZDL/LN/GR to 8782' WLM. Logged 8782'-3500'. POH. Completed logging run with Formation logs from 8782.0 ft to 3500.0 Rigged down Logging/braided cable equipment RD Baker Atlas tools. Work completed, equipment laid out Serviced Drillfloor / Derrick Pull floor plates & clean large amount of surface cuttings from drip pan under & around rotary & draworks. Reline absorb under draworks. Equipment work completed BHA run no. 6 RECEIVE Alaska Oil & Gas Cons. Anchorage Progress Report CONFIDENTIAL Facility Gwydyr Bay Ice Well WGwyder01 Page 10 Rig Nabors 7ES Date 21 February 00 Date/Time 17:00-18:00 18:00 18:00-20:00 20:00 20:00-01:30 12 Feb 00 01:30 01:30-02:00 02:00 02:00-06:00 02:00-06:00 06:00-06:00 06:00-06:00 13 Feb 00 06:00-06:00 06:00-21:00 21:00 21:00-23:30 23:30 23:30-00:00 14Feb 00 00:00 00:00-01:00 01:00 01:00-01:30 01:30 01:30-02:30 02:30 02:30-06:00 06:00-01:30 06:00-19:00 19:00 19:00-21:00 Duration 1 hr 2hr 5-1/2 hr 1/2 hr 4 hr 4 hr 24 hr 24 hr 24 hr lShr 2-1/2 hr 1 hr 1/2 hr lhr 3-1/2 hr 19-1/2 hr 13hr 2hr Activity Serviced Top drive Equipment work completed Made up BHA no. 6 MU BHA. Orient motor. Load MWD. RIH. BHA no. 6 made up R.I.H. to 8756.0 ft PU 30 singles. RIH to shoe. Fill pipe & test MWD-OK. RIH to 8756. Filled pipe @ 6000'. MWD check shot @ 8473'. Spill Drill-OS-1 min. Began precautionary measures Reamed to 8780.0 ft Pump nut plug sweep & wash to bottom. On bottom Drilled to 8960.0 ft D2 Drill-OS-l:15 min; Fire Drill-OS-1:30 rain; Spill Drill-OS- 1:20 min. Drilled to 8960.0 ft D2 Drill-OS-1:30 min. Started getting sticky for first 30' while backreaming previous 3 stds. BHA run no. 6 (cont...) Drilled to 9825.0 ft (cont...) D2 Drill-OS-1:30 min. Started getting sticky for first 30' while backreaming previous 3 stds. BHA run no. 6 (cont...) Drilled to 10556.0 ft (cont...) D2 Drill-OS-1:30 min. Started getting sticky for first 30' while backreaming previous 3 stds. Started scheduled wiper trip: due to Drag on connections Circulated at 10556.0 ft Circ & cond mud. Obtained req. fluid properties - 150.00 %, hole vol. Circulated at 10356.0 ft Monitor well-OK. Pump dry job. Blow down. Heavy slug spotted downhole Pulled out of hole to 8662.0 ft Pulled an occasional 35M over on first 5 stands. D1 Drill-OS-l:15 min. At top of check trip interval Serviced Mechanical brake Service top drive & adjust brakes. Equipment work completed R.I.H. to 10556.0 ft RIH-No problems. Precautionary ream last stand to bottom. On bottom Drilled to 10700.0 ft TD called by onsite geologist. BI-IA run no. 6 (cont...) Drilled to 11030.0 ft (cont...) TD called by onsite geologist. Reached planned end of run - Geological Circulated at 11030.0 ft RECEIV ,~ t,~ ~ o Alaska Oil & Gas Cons. C Anchorage Circ Hi-Vis sweep. Monitor well-OK. Pump dry job. Blow down. D 0mmi~sl0n Facility Gwydyr Bay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENTIAL Page 11 Date 21 February 00 Date/Time 15 Feb 00 21:00 21:00-01:00 01:00 01:00-01:30 01:30 01:30-04:15 01:30-01:45 01:45 01:45-04:00 04:00 04:00-04:15 04:15 04:15-06:00 04:15-05:30 05:30 05:30-06:00 06:00-06:00 06:00-07:30 07:30 07:30-11:30 11:30 11:30-13:30 13:30 13:30-15:30 15:30 15:30-17:00 17:00 17:00-18:30 18:30 18:30-20:00 20:00 20:00-23:00 23:00 23:00-03:30 Duration 4hr 1/2 hr 2-3/4 hr 1/4 hr 2-1/4 hr 1/4 hr 1-3/4 hr 1-1/4 hr 1/2 hr 24 hr 1-1/2 hr 4hr 2 hr 2hr 1-1/2 hr l- 1/2 hr 1-1/2 hr 3 hr 4-1/2 hr Activity Heavy slug spotted downhole Pulled out of hole to 3400.0 ft Worked tight hole f/8630'-8200'. D1 Drill-OS-1'30 min. Monitor well @ shoe-OK. At 10-3/4in casing shoe Functioned Retrievable packer PU & set HOWCO storm packer @ 30'. Equipment work completed Test well control equipment Installed BOP test plug assembly Pull wear ring & set test plug. Equipment work completed Tested BOP stack Test BOPE to 250 / 5000 psi; annular to 250 / 3500 psi. Tested choke manifold on trip out. Witnessing waived by Chuck Scheve-AOGCC Field Inspector. D4 Drill. Pressure test completed successfully - 5000.000 psi Retrieved BOP test plug assembly Equipment work completed BHA run no. 6 Functioned Retrievable packer Pull storm packer. LD same. Equipment work completed Serviced Block line Slip & cut drlg line. BHA run no. 6 (cont...) Serviced Block line (cont...) Slip & cut drlg line. Line slipped and cut R.I.H. to 10935.0 ft RIH to 10,935'. Tight hole 8200' to 8400'. Work thru, cleaned up. Began precautionary measures Reamed to 11030.0 ft Ream last stand to bottom. Hole tight. Stopped · To circulate Circulated at 11030.0 ft Circ B/U. Some splintered shale in returns. Obtained clean returns - 150.00 % hole volume Pulled out of hole to 8000.0 ft POH. Tight @ 10,700', 10,640', 9970', 9900'. Pulled to 8000'. Began precautionary measures Decision made to go back to bottom. R.I.H. to 10556.0 ft Began precautionary measures Reamed to 11015.0 ft Ream 5 stds to 11,015' Stopped · To circulate Circulated at 11015.0 ft Circ and cond mud to 10.6+ ppg. Obtained clean returns - 200.00 % hole volume Pulled out of hole to 918.0 ft RECEIVE[ Anch0ra~0 Facility Gwydyr B ay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENTIAL Page 12 Date 21 February 00 Date/Time 16 Feb 00 17 Feb 00 03:30 03:30-06:00 03:30-06:00 06:00-07:30 06:00-07:30 07:30 07:30-18:00 07:30-09:30 09:30 09:30-15:00 15:00 15:00-18:00 18:00 18:00-00:00 18:00-18:30 18:30 18:30-22:30 22:30 22:30-23:30 23:30 23:30-23:45 23:45 23:45-00:00 00:00 00:00-02:00 00:00-01:00 01:00 01:00-02:00 02:00 02:00-06:00 02:00-03:00 03:00 Duration 2-1/2 hr 2-1/2 hr 1-1/2 hr 1-1/2 hr 10-1/2 hr 2hr 5-1/2 hr 3 hr 6hr 1/2 hr 4hr lhr 1/4 hr 1/4hr 2hr lhr lhr 4 hr lhr Activity At BHA Pulled BHA L/D bit, motor, MWD Pulled BHA L/D BHA. Download MWD. BHA run no. 6 (cont...) Pulled BHA (cont...) L/D BHA. Download MWD. BHA Laid out Electric wireline work Rigged up Logging/braided cable equipment Held PJSM. R/U Atlas wireline. Equipment work completed Conducted electric cable operations R/U Grand Slam logging tools and RIH to 11,007' WLM. Logged as per Geology. Temporarily stuck @ 10,230', closed caliper and worked free. Finished logging. Completed logging run with CDL-CNL-DLL-MLL-GR from 11007.1 to 8410.0 fl Rigged down Logging/braided cable equipment L/D logging tools. R/D Atlas. Equipment work completed 5in. Drillpipe workstring run Singled in drill pipe to 378.0 ft P/U muleshoe and 12 jts DP. 12 joints picked up Ran Drillpipe in stands to 11013.0 ft RIH and tagged fill @ 11,013'. Stopped: To circulate Circulated at 11013.0 ft No hole problems. Obtained bottoms up (100% annulus volume) Pulled Drillpipe in stands to 10400.0 ft At top of check trip interval Ran Drillpipe in stands to 11013.0 ft On bottom Cement:Abandonment plug Circulated at 11013.0 ft RfU Dowell. Held PJSM prior to cementing. Obtained clean returns - 100.00 % hole volume Mixed and pumped slurry - 60.000 bbl Pmp 5 bbls H20 and test lines to 3000 psi. Pmp 5 bbls H20. Mix and prop 290 sx (60 bbls cmt) @ 15.8 ppg. Pmp 5 bbls H20. Displaced with rig pumps, 170 bbls mud. Cement pumped CIP 0200 hrs 2/17/00. 5in. Drillpipe workstring run Pulled Drillpipe in stands to 10016.0 ft Pulled 10 stds drill pipe to 10,016'. Calc'd TOC @ 10,450'. Stopped: To circulate RECEIVE[ MP, R 7. .OOC Alaska ()it & 6aa co:,~. C;0mn Anch0rag0 [ssion Facility Gwydyr Bay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENTIAL Page 13 Date 21 February 00 Date/Time 03:00-04:00 04:00 04:00-05:30 05:30 05:30-06:00 06:00-16:00 06:00-12:00 12:00 12:00-12:30 12:30 12:30-15:00 15:00 15:00-16:00 16:00 16:00-17:00 16:00-16:30 16:30 16:30-17:00 17:00 17:00-22:30 17:00-17:30 17:30 17:30-18:00 18:00 18:00-19:00 19:00 19:00-21:00 21:00 21:00-21:30 21:30 21:30-22:30 22:30 22:30-23:00 22:30-23:00 Duration lhr 1-1/2 hr 1/2 hr 10hr 6hr 1/2 hr 2-1/2 hr 1 hr lhr 1/2 hr 1/2 hr 5-1/2 hr 1/2 hr 1/2 hr lhr 2 hr 1/2 hr 1 hr 1/2 hr 1/2 hr Activity Circulated at 10016.0 ft CBU & pmp dry job. Obtained bottoms up (100% annulus volume) Had cement contaminated mud returns. Pulled Drillpipe in stands to 7500.0 ft Stopped: To pick up/lay out tubulars Laid down Drillpipe of 300.0 ft LDDP @ report time. 5in. Drillpipe workstring run (cont...) Laid down 10016.0 ft of Drillpipe (cont...) LDDP @ report time. 323 joints laid out Rigged up sub-surface equipment - Cement retainer P/U HES 10-3/4" EZSV. Equipment work completed Ran Drillpipe in stands to 3443.0 ft At Setting depth: 3443.0 ft Tested Cement retainer - Via annulus Set EZSV. Set down 20K to confirm set. Sheared out and released. Established injection rate 3 bpm, 600 psi. No annular communication. Function test completed satisfactorily Cement: Abandonment plug Held safety meeting Completed operations Mixed and pumped slurry - 25.000 bbl Pmp 5 bbls H20 and test lines to 4500 psi. Pmp 5 bbls H20 and 25 bbls cmt @ 15.8 ppg. Clear truck with 4 bbls H20 and finished displace with 50 bbls mud using rig pumps. CIP 1700 hrs 2/17/00. Calc'd TOC @ 3391' Cement pumped 5in. Drillpipe workstring run Pulled Drillpipe in stands to 3250.0 ft Stopped ' To circulate ~3,~ 2" 201 Circulated at 3250.0 ft Obtained bottoms up (100% annulus volume)Alaska 0il & Gas Co.qs. Tested Casing Arlchora~o R/U recorder and pressure test 10-3/4" casing and EZSV to 3000 psi for 30 min, OK. Test witnessed by J. Crisp AOGCC. Pressure test completed successfully - 3000.000 psi Laid down 2765.0 ft of 5in OD drill pipe L/D singles to 485'. Stopped :To circulate Circulated at 485.0 ft Spotted 30 bbls 16.0 ppg viscous mud from 485' to 185'. Heavy slug spotted downhole Laid down 496.0 ft of 5in OD drill pipe L/D singles and retainer running tool. 16 joints laid out Wellhead work Removed Wear bushing 'D arnn,.ia~i0n Facility Gwydyr Bay Ice Progress Report Well WGwyder01 Rig Nabors 7ES CONFIDENTIAL Page 14 Date 21 February 00 Date/Time 18 Feb 00 23:00 23:00-23:30 23:00-23:30 23:30 23:30-00:30 23:30-00:00 00:00 00:00-00:30 00:30 00:30-01:30 00:30-01:30 01:30 01:30-04:30 01:30-04:30 04:30 04:30-06:00 04:30-06:00 06:00-10:00 06:00-08:00 08:00 08:00-10:00 10:00 10:00-11:00 10:00-11:00 11:00 11:00-06:00 11:00-14:00 14:00 Duration 1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr lhr lhr 3hr 3 hr 1-1/2 hr 1-1/2 hr 4hr 2hr 2hr 1 hr lhr 19hr 3hr Activity Equipment work completed 5in. Drillpipe workstring run Ran Drillpipe in stands to 185.0 ft RIH w/2 stds DP and muleshoe. Stopped: To circulate Cement: Abandonment plug Held safety meeting Completed operations Mixed and pumped slurry - 20.000 bbl Pmp 3 bbls H20. Pmp 20 bbls cmt (120 sx) at 15.7 ppg and 2 bbls H20. CIP 0030 hrs 2/18/00. Cement pumped 5in. Drillpipe workstring run Laid down 185.0 ft of 5in OD drill pipe Pulled drill pipe to 30' and displaced cement from BOP stack. LDDP. Function rams, flush stack. 6 joints laid out Nipple down BOP stack Removed BOP stack Removed BOP's. Removed outer annulus valve. Checked TOC, 40' below ground level. Equipment work completed Wellhead work Installed Swab valve Clear cellar. Prepare shooting flange and big bore valve for installation while wait on cement for top job. Cleaning pits and preparing for rig move. Cement :Abandonment plug Rigged up High pressure lines RJU Dowell. M/U 40 ft of 1" tubing. Hook up super sucker and vac truck. Equipment work completed Mixed and pumped slurry - 7.000 bbl Mix and pump total 47 sx AS 1 cmt @ 15.7 ppg. Cleared excess cmt with super sucker. Washed up with vac truck. TOC 5' below well head. CIP 0915 hrs 2/18/00. Cement pumped Wellhead work Installed Adapter spool PxECEl~q Installed adaptor flange and big bore valve. Secured well. ~.~,),~ ? ~ ~.{ Equipment work completed Planned maintenance c,' Ga3 Cons. Serviced Fluid system ~laska ,~jtl & Clean pits of all fluids. Rig released for move to J-05B 1400 hrs 2/18/00. Equipment work completed ED CONFiBENTi&L West Gwydyr Bay # 1 Plug and Abandonment Personnel and Equipment were mobilized to the site On February 21st, 2000. Employees from Peak Oilfield Services ( loader with operator) FMC ( wellhead technician) Arctic Fabricators (welder) and Tool Service (laborers) were on site. Following a pre-job safety meeting and discussion of program, work proceeded as follows: ]. Removed dry hole tree 2. Removed Casing and Tubing Spool 3. Collapse cellar "box" 4. Removed Cellar and Insulation s. Cut and Remove Base Plate 6. Cut 20" conductor ?. Chip cement in 20"x 13 3/8" annulus s. Cut 13 3/8"casing and Remove cut-off 9. Weld Abandonment Marker in place 10. Inspection & Approval by Paul McClarnon (DEC) Back fill Cellar hole Demobilize equipment All above work was completed on February 21st, 2000. February 23rd: February 24th: February 25th: February 27th: Pad was scraped, dirty snow transported to Pad 3 Final pad inspection with Environmental Technician Final road delineators removed Creek trenched to facilitate break up, Road blocked .... ~.,E[VED A~t~omge North Slope Alaska Alaska State Plane 4 EXPLORATION GB WGWYD YR-01 Staked Surveyed: 14 February, 2000 SURVEY REPORT I March, 2000 Your Ref: API-500292295400 Surface Coordinates: 6005938.41 N, 607366.90 E (70025' 31.2552" N, 149° 07' 30.2889" W) Kelly Bushing: 52.70ft above Mean Sea Level nRILLIIMI~ SERVII~ES SurveyRef:svy9653 Sperry-Sun Drilling Services Survey Report for WGWYDYR-01 Staked Your Ref: API-500292295400 Surveyed: 14 February, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 0.00 0.000 0.000 -52.70 0.00 110.55 0.050 9.310 57.85 110.55 204,09 0.110 171.130 151.39 204.09 294.53 0.060 156.810 241.83 294.53 388.28 0.210 174.040 335.58 388.28 481.53 0.300 144.520 428.83 481.53 572.98 0.380 178.680 520.28 572.98 666.86 0.400 187.760 614.15 666.85 756.71 0.820 198.960 704.00 756.70 850.83 0.890 194.340 798.11 850.81 945.31 0.930 194.780 892.58 945.28 1041.87 0.410 207,660 989.13 1041.83 1137.45 0.200 191.440 1084.71 1137.41 1231,52 0.370 169.030 1178.78 1231.48 1326.56 0.720 137.100 1273.81 1326.51 1419.48 0.930 147.410 1366.72 1419.42 1515.13 0.800 155.850 1462.36 1515.06 1608.86 1.010 171.110 1556.08 1608.78 1703.69 0.320 118.580 1650.91 1703.61 1795.04 0.160 113.130 1742.25 1794.95 1891.66 0.090 24.160 1838.87 1891.57 1985.54 0,090 36.250 1932.75 1985.45 2082.13 O. 110 153.720 2029.34 2082.04 2174.97 0.360 124.030 2122,18 2174.88 2267.39 0.260 116.970 2214.60 2267,30 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (fi) (fi) (ft) 0.00 N 0.00 E 6005938.41 N 607366.90 E 0.05 N 0.01 E 6005938.46 N 607366.91 E 0.00 N 0.03 E 6005938.41 N 607366.93 E 0.13 S 0.06 E 6005938.28 N 607366.96 E 0.35 S 0.10 E 6005938.07 N 607367.00 E 0.71 S 0.26 E 6005937.70 N 607367.17 E 1.21 S 0.40 E 6005937.20 N 607367.32 E 1.85 S 0.37 E 6005936.57 N 607367.29 E 2.77 S 0.11 E 6005935.64 N 607367.05 E 4.11 S 0.29 W 6005934.29 N 607366.67 E 5.57 S 0.66 W 6005932.84 N 607366.32 E 6.63 S 1.02 W 6005931.77 N 607365.97 E 7.10 S 1.21 W 6005931.30 N 607365.79 E 7.55 S 1.19 W 6005930.84 N 607365.82 E 8.29 S 0.72 W 6005930.11 N 607366.29 E 9.36 S 0.08 E 6005929.06 N 607367.11 E 10.62 S 0.77 E 6005927.80 N 607367.82 E 12.03 S 1.17 E 6005926.40 N 607368.24 E 12.99 S 1.53 E 6005925.45 N 607368.61 E 13.16 S 1.87 E 6005925.28 N 607368.96 E 13.14 S 2.02 E 6005925.30 N 607369.11 E 13.01 S 2.10 E 6005925.43 N 607369.18 E 13.04 S 2.18 E 6005925.41 N 607369.27 E 13.28 S 2.46 E 6005925.17 N 607369.56 E 13.54 S 2.89 E 6005924.92 N 607369.99 E RECEIVED MAR 2_ 4 000 Dogleg Rate (°/lOOft) 0.045 0.169 0.060 0.164 0.168 O.234 0.069 0.484 0.104 0.043 0.557 0.235 0.213 0.474 0.276 0.190 0.339 0.901 0.177 0.189 0.020 0.177 0.291 0.116 Alaska State Plane 4 EXPLORATION GB Vertical Section (ft) Comment o.oo o.05 O.Ol -o.o9 -0.28 -0.55 -o.94 -1.54 -2.48 -3.87 -5.35 -6.47 -6.98 -7.39 -7.87 -8.52 -9.39 -10.52 -11.24 -11.26 -11.18 -11.04 -11.02 -11.13 -11.19 Continued... I March, 2000- 14:01 Aliiska Oil & Gas Cons. Commission Anchorage DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for WGWYDYR-01 Staked Your Ref: API-500292295400 Surveyed: 14 February, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 2363.61 0.220 112.310 2310.82 2363.52 2461.21 0.190 74.410 2408.42 2461.12 2556.68 0.450 85.300 2503.89 2556.59 2653.55 0.330 89.150 2600.76 2653.46 2749.18 0.190 69.960 2696.39 2749.09 2843.05 0.310 45.810 2790.25 2842.95 2936.61 0.190 75.600 2883.81 2936.51 3031.97 0.240 22.410 2979.17 3031.87 3127.12 0.180 312.510 3074.32 3127.02 3220.84 0.180 322.880 3168.04 3220.74 3315.71 0.230 332.510 3262.91 3315.61 3409.49 0.260 7.700 3356.69 3409.39 3487.51 0.090 339,080 3434.71 3487.41 3592.09 0.210 45.640 3539.29 3591.99 3686.64 0.280 30.490 3633.84 3686.54 3775,97 0.220 30.610 3723.17 3775.87 3877.54 0.210 22.080 3824.74 3877.44 3970,80 0.210 2.900 3918,00 3970.70 4065.24 0.050 344.480 4012,44 4065.14 4160.00 0.090 229.300 4107.20 4159.90 4254.79 0.090 169,820 4201.99 4254.69 4349.27 0.120 115.670 4296.47 4349.17 4441.67 0.180 109.620 4388.87 4441.57 4528.40 0.120 103.700 4475.60 4528.30 4621.06 0.130 89.000 4568.26 4620.96 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 13.71 S 3,26 E 6005924.75 13.73 S 3.59 E 6005924.73 13.66 S 4.11 E 6005924.81 13.63 S 4.77 E 6005924.85 13.57 S 5.20 E 6005924.92 13.34 S 5.52 E 6005925.15 13.12 S 5.86 E 6005925.37 12.90 S 6.08 E 6005925.60 12.61 S 6.05 E 6005925.89 12.40 S 5.85 E 6005926.10 12.11 S 5.68 E 6005926.39 11.73 S 5.62 E 6005926.76 11.50 S 5.62 E 6005926.99 11.29 S 5.73 E 6005927.21 10.97 S 5.97 E 6005927.53 10.63 S 6.17 E 6005927.87 10.29 S 6.33 E 6005928.21 9.96 S 6.41 E 6005928.54 9.75 S 6.41E 6005928.75 9.76 S 6.34 E 6005928.74 9.88 S 6.29 E 6005928.62 9.99 S 6.40 E 6005928.51 10.09 S 6.62 E 6005928.42 10.15 S 6.84 E 6005928.36 10.17 S 7.04 E Dogleg Rate (°/lOOft) Alaska State Plane 4 EXPLORATION GB Vertical Section (ft) N 607370.35 E 0.046 -11.20 N 607370.68 E 0.139 -11.09 N 607371.21 E 0.278 -10.81 N 607371.87 E 0.127 -10.51 N 607372.29 E 0.170 -10.28 N 607372.61 E 0.167 -9.94 N 607372.94 E 0.185 -9.61 N 607373.17 E 0.207 -9.31 N 607373.13 E 0.258 -9.06 N 607372.93 E 0.035 -8.94 N 607372.75 E 0.064 -8.75 N 607372.68 E 0.161 -8.43 N 607372.68 E 0.238 -8.22 N 607372.79 E 0.184 -7.98 N 607373,02 E 0.100 -7.59 N 607373.22 E 0.067 -7.20 N 607373.38 E 0.033 -6.82 N 607373.45 E 0.075 -6.49 N 607373.45 E 0.173 -6.30 N 607373.38 E 0.127 -6.34 6005928.34 N 607374.08 RECEIVED N 607373.34 E 0.094 -6.46 N 607373.44 E 0.105 -6.53 N 607373.67 E 0.067 -6.52 N 607373.88 E 0.071 -6.49 E 0.036 -6.43 MAR 2 4 2000 kiaska 0ii & Ga.~ ~u~t~. u~,,,,,,,oo .... Anchora§e Comment Continued... DrillQuest 1.05.04e I March, 2000 - 14:01 - 3 - Sperry-Sun Drilling Services Survey Report for WGWYDYR-01 Staked Your Ref: API-500292295400 Surveyed: 14 February, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 4716.80 0,130 129,480 4664.00 4716.70 4809.94 0.210 125.150 4757.14 4809.84 4906.92 0,190 110.890 4854.11 4906.81 5001.26 0.230 111.260 4948.45 5001.15 5095.00 0.280 116.030 5042.19 5094.89 5189.64 0,250 115.750 5136.83 5189.53 5284.37 0.410 131.210 5231.56 5284.26 5378,42 0.410 135.350 5325.61 5378.31 5472.05 0.400 120,920 5419,24 5471.94 5565.40 0.280 82.130 5512,58 5565.28 5660.28 0.150 80,750 5607,46 5660.16 5755,71 0.170 82.760 5702.89 5755.59 5848.79 0.160 137.730 5795.97 5848.67 5944.28 0.350 163.970 5891.46 5944.16 6041.89 0.430 154.320 5989.07 6041.77 6137.12 2.110 24.550 6084.28 6136.98 6167.06 4.000 20.440 6114.18 6166.88 6200.49 5.240 19.970 6147.50 6200.20 6232.30 5.410 19.870 6179.17 6231.87 6326.52 6.860 21,870 6272.85 6325.55 6419.82 10,140 23.830 6365.11 6417,81 6515.08 10.550 23.900 6458.82 6511,52 6580.26 13.200 24.640 6522.60 6575,30 6609.11 14.490 24.330 6550.61 6603,31 6701.85 16.890 28.530 6639.89 6692.59 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (fi) (ft) (ft) (ft) Dogleg Rate (°/100ft) 1 March, 2000- 14:01 10.24 S 7.23 E 6005928.27 N 607374.28 E 0.094 10.41 S 7.45 E 6005928.11 N 607374.50 E 0.087 10.57 $ 7.75 E 6005927.96 N 607374.80 E 0,055 10.69 S 8.07 E 6005927.84 N 607375.12 E 0,042 10.86 S 8.45 E 6005927.67 N 607375.51 E 0,058 11.05 S 8.84 E 6005927.49 N 607375.90 E 0.032 11.36 S 9,28 E 6005927.18 N 607376.35 E 0,192 11.82 S 9,77 E 6005926.73 N 607376.84 E 0.031 12.23 S 10.29 E 6005926.33 N 607377.36 E 0,109 12.37 S 10,80 E 6005926.20 N 607377.87 E 0.271 12.32 S 11.15 E 6005926.26 N 607378.22 E 0,137 12.28 S 11.41 E 6005926.30 N 607378,49 E 0.022 12.36 S 11.64 E 6005926.22 N 607378,71 E 0.164 12.74 S 11.81 E 6005925.85 N 607378,89 E 0,229 13.35 S 12.05 E 6005925.23 N 607379.14 E 0,106 12.08 S 12.93 E 6005926.52 N 607380.00 E 2.528 10.60 S 13.52 E 6005928.01N 607380.58 E 6,351 8.07 S 14.45 E 6005930.55 N 607381.47 E 3.711 5.30 S 15.46 E 6005933.34 N 607382.43 E 0.535 4.10 N 19.06 E 6005942.79 N 607385.90 E 1,555 16.79 N 24.46 E 6005955.55 N 607391.12 E 3,529 32.43 N 31.38 E 6005971.29 N 607397.81 E 0.431 44.66 N 36.90 E 6005983.59 N 607403.16 E 4.072 50,94 N 39.76 E 6005989.92 N 607405.93 E 4.479 73,35 N 50.98 E 6006012.49 N 607416.82 E 2.861 RECEIVED Alaska State Plane 4 EXPLORATION GB -4- Vertical Section (ft) Comment Ala.~ka Oil & Gas Cons. Commission Anchorage -6.42 -6.48 -6.50 -6.48 -6.48 -6.50 -6.60 -6.83 -6.99 -6.91 -6.72 -6.57 -6.56 -6.83 -7.30 -5.78 -4,18 -1.50 1.45 11,50 25.29 42.39 55.80 62.71 87.74 Continued... DrillQuest 1,05. 04e Sperry-Sun Drilling Services Survey Report for WGWYDYR-01 Staked Your Ref: API-500292295400 Surveyed: 14 February, 2000 North Slope Alaska Measured Depth (ft) Incl. 6796.31 6891.37 6984.53 7078.39 7176.80 7272.93 7366.90 7460.73 7557.41 7618,32 7650.45 7746.41 7791.10 7840.56 7935.18 8029.03 8084.88 8124.52 8218.61 8315.05 8408.37 8498.91 8596,13 8686.46 8784.57 19.500 22.230 23.750 27,250 30.210 34.580 35.110 34.540 35,110 35,350 35.570 34.810 33.400 32,400 31,930 33,290 33.860 33.160 33.190 33.940 32.330 33.770 32.910 31.350 31.860 Azim. 28.730 29.790 31.87o 29.890 28.780 26.840 25.280 26.360 27.060 26.320 27.o7o 26.390 25.570 25.650 25.050 25.11o 24.420 24.69o 24.41o 20.830 2o.15o 19.84o 19.25o 18.71o 19.17o Sub-Sea Depth (ft) 6729.62 6818.44 6904.20 6988.90 7075.19 7156.34 7233.47 7310.49 7389.86 7439.61 7465.78 7544.20 7581.21 7622.73 7702.83 7781.88 7828.42 7861.47 7940.22 8020.59 8098.73 8174.62 8255.84 8332.33 8415.89 Vertical Depth (ft) 6782.32 6871.14 6956.90 7041.60 7127.89 7209.04 7286.17 7363.19 7442.56 7492.31 7518,48 7596.90 7633.91 7675.43 7755.53 7834.58 7881.12 7914.17 7992.92 8073.29 8151.43 8227.32 8308.54 8385.03 8468.59 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 99.24 N 65.11 E 6006038.57 N 607430.58 E 128.76 N 81,68 E 6006068.33 N 607446.72 E 159.99 N 100.34 E 6006099.83 N 607464.93 E 194.68 N 121.03 E 6006134.81N 607485.12 E 235.92 N 144.19 E 6006176.38 N 607507.68 E 281.48 N 168.16 E 6006222.29 N 607530.99 E 329.72 N 191.74 E 6006270.85 N 607553.88 E 377.95 N 215.07 E 6006319.41 N 607576.51 E 427.27 N 239.89 E 6006369.08 N 607600.62 E 458.66 N 255.67 E 6006400.70 N 607615.95 E 475.31 N 264.05 E 6006417.47 N 607624.08 E 524.70 N 288.92 E 6006467.21 N 607648.24 E 547.22 N 299.90 E 6006489.89 N 607658.90 E 571.45 N 311.51E 6006514.28 N 607670.16 E 616.97 N 333.08 E 6006560.11 N 607691.07 E 662.78 N 354.52 E 6006606.22 N 607711.85 E 690.82 N 367.46 E 6006634.45 N 607724.38 E 710.73 N 376.55 E 6006654.48 N 607733.19 E 757.56 N 397.94 E 6006701.62 N 607753.90 E 806.77 N 418.43 E 6006751.11 N 607773.68 E 854.54 N 436.29 E 6006799.14 N 607790.85 E 900.95 N 453.17 E 6006845.78 N 607807.06 E 951.30 N 471.05 E 6006896.39 N 607824.21 E 996.72 N 486.68 E 6006942.03 N 607839.19 E 1045.35 N 503.37 E 6006990.90 N 607855.17 E RECEIVED MAR 2 4 2000 Dogleg Rate (°/100ft) 2.764 2.899 1.85o 3.837 3.056 4.672 1.1o3 0.895 0.720 0.804 1.517 o.891 3.319 2.024 o.6ol 1.45o 1.228 1.8o5 o.166 2.194 1.771 1.6Ol 0.945 1.756 0.575 Alaska State Plane 4 EXPLORATION GB Vertical Section (ft) Comment 117.14 150.85 186,97 227.08 274.17 325.55 379.20 432.75 487.90 523.OO 541.62 596,85 621,90 648.75 699.11 749.67 780.56 8O2.44 853.92 907.21 958.12 1007.38 1060.65 1108.50 1159.72 Continued... I March, 2000- 14:01 - 5- Alaska 0ii & Gas Co~s. Commission Anchorage DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for WGWYDYR-01 Staked Your Ref: API-500292295400 Surveyed: 14 February, 2000 North Slope Alaska Measured Depth (ft) Incl. 8899.86 8976.18 9o7o.33 9160.43 9257.81 9352.53 9445.85 9535.19 9635.23 9731.11 9826.28 992o. 16 10016.00 10109.90 1 o2o5.5o 10301,20 10394.50 1 o488.4o lO579.1o lO679.9o 10771.60 1 o865.80 1 o962.2o 11030.00 31.300 30.820 29.790 28.810 27.600 27.400 27.370 27.210 26.410 25.900 26.290 25.020 23.900 23.900 22.380 21.450 20.030 18.520 17.250 16.770 16.770 16.790 17.060 17.060 Azim. 18.900 19.700 20.760 22.030 22,040 22.070 22.92O 23,020 22,76O 22,350 21,980 22.430 23.490 23.620 23.940 25.010 25.480 25.970 26.480 26.810 27.470 27.860 27.250 27.250 Sub-Sea Depth (ft) 8514,11 8579.48 8660.77 8739.34 8825.16 8909.17 8992.04 9071.43 9160.72 9246.78 9332.25 9416.87 9504.11 9589.96 9677.87 9766.65 9853.90 9942.54 10028.85 10125.24 10213.04 1O3O3.23 1O395.45 10460.27 Vertical Depth (ft) 8566.81 8632.18 8713.47 8792.04 8877.86 8961.87 9044.74 9124.13 9213.42 9299.48 9384.95 9469.57 9556.81 9642.66 9730.57 9819.35 99O6.60 9995.24 10081.55 10177.94 10265.74 10355.93 10448.15 10512.97 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 1102,43 N 523,06 E 6007048.25 N 607874.04 E 1139.59 N 536,07 E 6007085.60 N 607886.52 E 1184.17 N 552.49 E 6007130.41N 607902.30 E 1225.22 N 568,57 E 6007171.69 N 607917.78 E 1267.89 N 585.84 E 6007214.59 N 607934,43 E 1308.42 N 602.26 E 6007255.36 N 607950.27 E 1348.08 N 618.68 E 6007295.25 N 607966.12 E 1385.79 N 634.67 E 6007333.19 N 607981.56 E 1427.36 N 652.22 E 6007375.01 N 607998.51 E 1466.39 N 668.43 E 6007414.27 N 608014.16 E 1505.16 N 684.22 E 6007453.26 N 608029.40 E 1542.79 N 699.58 E 6007491.11 N 608044.21 E 1579.33 N 715.05 E 6007527.87 N 608059.15 E 1614.20 N 730.25 E 6007562.95 N 608073.85 E 1648.58 N 745.40 E 6007597.55 N 608088.50 E 1681.09 N 760.19 E 6007630.27 N 608102.83 E 1710.98 N 774.28 E 6007660.35 N 608116.48 E 1738.90 N 787.73 E 6007688.47 N 608129.53 E 1763.89 N 800.03 E 6007713.63 N 608141.47 E 1790.25 N 813.25 E 6007740.17 N 608154.31 E 1813.79 N 825.32 E 6007763.89 N 608166.04 E 1837.88 N 837.95 E 6007788.16 N 608178.32 E 1862.76 N 850.93 E 6007813.22 N 608190.94 E 1880.44 N 860.04 E 6007831.03 N 608199.80 E RECEIVED MAR 2 4 2000 Alaska Oi! & Gas Cons. Commission Anchorage Dogleg Rate (°/lOOft) 0.501 0.829 1.233 1.288 1.243 0.212 0.420 0.186 0.808 0.564 0.444 1.369 1.255 0.056 1.595 1.058 1.532 1.617 1.411 0.486 0.208 0.121 0.335 0.000 Alaska State Plane 4 EXPLORATION GB Vertical Section (ft) Comment 1219.87 1259.11 1306.51 1350.56 1396.55 1440.26 1483.17 1524.13 1569.24 1611.49 1653.33 1693.95 1733.63 1771.67 1809.24 1844.95 1877.98 1908.97 1936.80 1966.25 1992.67 2019.81 2047.82 2067.68 Projected Survey Continued... DrillQuest 1.05.04e I March, 2000 - 14:01 - 6- Sperry-Sun Drilling Services Survey Report for WGWYDYR-01 Staked Your Ref: API-500292295400 Surveyed: 14 February, 2000 North Slope Alaska Alaska State Plane 4 EXPLORATION GB All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 24.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11030.00ft., The Bottom Hole Displacement is 2067.79ft., in the Direction of 24.577° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 11030.00 10512.97 1880.44 N 860.04 E Projected Survey RECEIVED MAR 2 ;I- 200~ Alaska 0il & Gas Cons. Commission Anchorage Continued... I March, 2000 - 14:01 - 7- DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for WGWYDYR-01 Staked Your Ref: API-500292295400 Surveyed: 14 February, 2000 North Slope Alaska Alaska State Plane 4 EXPLORATION GB Survey tool program From Measured Vertical Depth Depth (ft) (ft) 0.00 0.00 To Measured Depth (ft) 11030.00 Vertical Depth (ft) 10512.97 Survey Tool Description MWD Magnetic RECEIVED Alaska Oil & Gas Cons. Commission Anchorage I March, 2000 - 14:01 - 8 - DriilQuest 1.05.04e Well Name: Surface Location: (~/SNL EWL Sec., Township, Range S u rvey: USed: ' : Vendor: 26 25 30 29 28 27 26 25 30 29 35 36- I, 3i~-* 3~-- ~3,~..-~3~ -~,3~ -X3E -~3~ 32 i iii i 2 I 6 5 (~ 3 2 I 6 5 i 11 12 7 8 9 10 11 12 7 8 i 14 13 18 17 16 15 14 13 18 17 23 24 19 20 21 22 23 24 19 20 26 25 30 29 28 27 26 25 30 29 35 36 31 32 33 34 35 36 31 32 2 I 6 5 4 3 2 I 6 5 11 12 7 8 9 10 11 12 7 8 At Top of Productive Interval ,, North / South , ,J East / West At Effective Depth (PBTD) , ~ Rorth / South East / West At Total Depth __~;outh est %3o? ~ ~9 ~0 = s3~57- ~;c90 = · ' ~ olated..FrO~ These:,Point~':'..:, ~;:o'v; :':::.:::::":"' "'eiow ..... .:...:..':-.....: ' ' Ab°Ve':: ., . Below ,, ,' AbOVe , ~ -Below LO 5812,89' 475t.08' SEC 06 T12N, R12E 4773.12' DIMENSIONS 5257.15' LO SEC 51 T13N, R12E 5279.55' '~279.54-' 1~61.8!' SEC 05 T12N, R12E 5279.54' SHOWN ARE ASP 5279.55' SEC 52 T13N, R12E 5279'54' ./',V. O WYB YR N O. 1 -~-- SURFACE SEC 04 5279.55' ~, 80~'~OM HOLE T12N, R12E 5279.54' GRID (ASP ZONE 4-) 5279.55' SEC 33 T13N, R12E 5279.55' 1061,82' On -.,,j ,. ]1 08:41 From-~C WIN~ ~---. T-154 P.O03/O0§ F-~g -[ .'\ / :': ,. Mar-22-2000 88:43 From-UCC WlNG$~-.. +90T-$Sg-$08~, T-164 P.O04/OO5 F-239 -.., ~r~: S~andan P: ~rallel ~c T3N, tT3N R2E c 'r2N ~: 'ET1N W R2W ¢~,, ,;~,R1E R2E . :..,::..'~,?.:; :?.:,;-~.:. ., . .. : .'" ...~ . ,. .},, ~., ,.', .': ~ .-, ., .'. ,~ .. ""; - I' ' ' ~ · ' ']' ;,.~..'. .'. ',:, .¢"; 'i. ' . .." . ~'"'~-": '"' :i!~ · ,:-'" ", ,H', . . .. ~, .. ":; .,,'.,,.-.,,,,....-,;-.. ,~.',.", , .-",. -, -. ,. ,."T.':.'; '.'.'i:: ~.-...,? 'g..;, · ,.j -... · .. ,.. ~.~. .~.~. ' .'. ~ ~,'.~.~: .' · .... , %:~.;'-' .,."2 - .... .~,.- :-.' .;.. ~.~,~', .,.: .- -....,.' ... .,.... ·.., ,.-.. ....~ · . '. ~: ..'.' . ::'!',(..;.~.," , ., · ;.., '..' ,t .; .~. ".-;,. '. ii...:~ · ' -i;... ;' .. · · · :r.,.L. .. .- . .'):. -. t .' .~ z ~ . " L '.>4';"i"" .:. '.., ~' · . .,~ · .~%...~. ..~~; . ~ "";"'"' ' ['..~F, ' ' -~.;.., ,~ ,.- ~..:..~.::. ;.~... · . .'. -..;.. · . ',2:; .~'.':~ -- · ~'. .. .' . i,-~,~....: · :i. i%;.. :'""L' ;'-':..':i':-'.':{} .k[',.,'~ .' :-,i.'-' ' , 't '. .' _' :' ' Figure 23-2. Survey of quadrangles. (Only a few of the standard corners and closing corners are identified.) I ..... --- '-aL . ' .............. mm-ii BP EXPLORATION WEST GWYDYR #1 PRUDHOE BAY FIELD Section 04, T12N- R12E, UM North Slope, Alaska EPOCH WELL SERVICES INC. BP EXPLORATION WEST GWYDYR NO. 1 WELL REPORT 70' TO ~ 1030' 1/28/00 to 2/t 5/00 Prepared By: EPOCH WELL SERVICES INC. ·/ELL RESUME BP EXPLORATION WELL NAME: FIELD: REGION: LOCATION: BOROUGH: STATE: ELEVATION: APl NUMBER: OPERATOR: Operator Representatives: Company Geologists: CONTRACTOR: MUDLOGGING COMPANY: Logging Geologists: MUD COMPANY: Mud Engineers: MWD COMPANY: DIRECTIONAL COMPANY: Directional Driller: CEMENT COMPANY: WEST GWYDYR #1 PRUDHOE BAY FIELD NORTH SLOPE, ALASKA 3509' FSL, 5066' FEL SEC04 T'I2N R12E UM NORTH SLOPE BOROUGH ALASKA GL: 24.2 AMSL RKB: 53.5' AMSL #50-029-22954-00 BP EXPLORATION JOHN PALL, TOM ANGLEN DAVID STEARNS, HARRY HAYVVOOD NABORS ALASKA DRILLING: Rig #7ES EPOCH WELL LOGGING INC. CRAIG SILVA, RALPH WINKELMAN BAROID DRILLING FLUIDS MICHAEL BARRY, WALT WOLF, CURT PATTERSON, ETHAN LAUFER SPERRY SUN DRILLING SERVICES SPERRY SUN DRILLING SERVICES ROBERT WALL HALLIBURTON WIRELINE COMPANY: ATLAS EXPLORATION WEST GWYDYR #1 DALLY CHRONOLOGY 112812000: 112912000: 1130t2000: 113112000: 2/0112000: 2/02/2000: 2/03/2000: 2/0412000: 2/05/2000: 2/0612000: ~.Q.07/2000: . · .. ~,~!2000: 2//0912000: 2/1012000: 2/1112000: 2/12/2000: 2/1312000: 2/14/2000: 2/1512000: 2/16/2000: 2/1712000: Rig up. Nipple up diverter and function test. Pick up drill pipe. Pick up drill pipe. Pick up heavy weight ddll pipe and stand back. Pick up bottom hole assembly. Spud well ao 0600 hours. Ddll from 110' to 833'. Drill from 833' to 1857'. Short tdp to 200'. No problems. Drill from 1857' to 2234'. Drill from 2234' to casing point at 3548'. Circulate high vis sweep and clean hole. Short tdp to 200'. Maximum overpull 25K. 5' fill. Circulate high vis sweep and clean hole. Pull out of hole. Run in hole with 10 %" casing. Rig up cement hoses and lines. Circulate and condition mud. Hold safety meeting. Pump cement. Rig down cement equipment. Nipple down hyddl. Nipple up BOPE and test BOPE. Pick up BHA #2 and pick up singles. Run in hole and tag at 3445'. Circulate bottoms up. Test casing, float equipment, and cement. Ddll 20' of new formation and perform leak-off test to 16.1ppg EMW. Spacer and displace with 3% KCL. Drill ahead to 3572'. Ddll ahead from 3572' to 4506'. Short trip. Service top drive. Drill ahead from 4506' to 5254'. Drill ahead from 5354' to 6411' with no problems. Drill from 6411' to 6485'. Circulate bottoms up. Pump high vis sweep. Pull out of hole. Pulled tight at 5820', 5500', and 5413'. Back ream and pump to shoe. Pull out of hole. Change BHA. RIH with Bit #3. Ddll ahead from 6485' to 6962'. Treat mud for bit bailing. Drill ahead from 6962' to 7626'. Start short tdp. Short tdp. Spot wash a pill around bit and BHA and let soak 5 minutes. Spin pipe and pump pill up. RIH to bottom with no problems. Ddlled 27' and balled up. Ddll to 7686' and pull out of hole for bit. Change BHA and test BOPE. RIH with Bit #4. Drill ahead from 7686' to 8219'. Drill ahead to 8471'. Pump high vis sweep. Pull out of hole with tight spot at 7524'. Change BHA. Cut drilling line. RIH with hole tight from 7000' to 8380'. Wash and ream to 8471'. Stage pumps. Drill from 8471' to 8475'. Thaw line to cuttings tank. Drill ahead from 8475 to 8780'. Circulate bottoms up. Pull out of hole to 7000'. Tight from 8100' to 8600'. RIH to 8170'. Wash and ream to 8780'. Pump high vis sweep. Circulate hole clean and pull out of hole. Pull out of hole. Rig up Baker Atlas for wireline logs. Run wireline logs. Service rig and RIH. RIH to 8156'. Pump walnut bit bailing sweep and wash to bottom. Ddll from 8780' to 9665'. Drill ahead from 9665' to 10556'. Circulate bottoms up. Survey and monitor hole. Pump slug. Blow down top ddve. Pull out of hole to 8662'. Service top ddve. RIH with no problems. Drill from 10556' to 11030'. Circulate high vis sweep. Flow check well and pump slug. Blow down top drive. Pull out of hole and work tight hole from 8630' to 8200'. Pull out of hole to shoe. Rest BOPE and cut ddlling line. RIH to 10935'. Work pipe through tight hole 8200' to 8400'. Break circulation and ream 90' to 11030'. Tight and torque and plugged nozzle. Circulate high vis sweep. Pull out of hole, tight at 10700', 10640', 9970', and 9900'. Pull to 8000. RIH to 10556'. Ream from 10556' to 11015'. Torque. Circulate and weight up to 10.6 ppg. Rotate and reciprocate while circulating. Pull out of hole and monitor closely. PuJJ out of hole. Lay down BHA. Rig up and run wireline logs. RIH with muleshoe. Circulate bottoms up. Run 5 stand short tdp. ~' uj z u~ ,-J o -- ~ ~ - ~ , 0~¢ 2~.0 ~.0 2.0 24.0 0~/30 ~3.5 2.0 ~.0 3.5 0.5 ~.5 24.0 01/31 2.0 1.0 10.0 6.0 3.5 1.5 24.0 , 0~01 2.5 3.0 1.5 6.0 9.0 1.0 1.0 24.0 0~02 19.5 2.0 0.5 1.0 1.0 24.0~ 0~03 24.0 24.0 , 0~04 1.0 12.0 1,0 1.0 2.5 1.0 5.5 24.0 0~05 24.0 24.0 0~08 21.5 0.5 2.0 24.0 0~07 6.0 6.0 1.5 1.0 1.5 0.5 4.0 3.5 24.0 0~08 24.0 24.0 0~09 10.5 3.0 1.5 0.5 0.5 1.0 7.0 24.0 ~10 13.0 2.0 5.0 3.0 0.5 0.5 24.0 0~11 6.5 3.0 9.0 1.0 4.5 24,0 , ~12 22.0 1.5 0.5 24.0 02/13 21.0 2.5 0.5 24.0 0~14 16.5 3.0 2.0 2.0 0.5 24.0 0~5 3.~ 4.5 9.5 2.0 4.~ 24.0 0~6 9.0 ~.0 0.5 9.5 4.0 2~.0 0.0 ~ 0.0 0.0 0.0 , 0.0 0.0 , , 0.0 ,, 0.0 0.0 0.0 , 0.0 , 0.0 0.0 0.0 0.0 ... 0.0 0.0 0.0 , 0.0 , 0.0 , TOTAL 2~.0 47.0 11.5 26.5 21.0 6.0 3.0 4.0 1.5 18.5 3.0 10.0 6.0 0.0 24.0 37.5 8.0 12.5 1.0 1.0 0,0 1.5 0.0 1.5 ~.0 ~ 26.31% ~4.78% 1.17% 2.~% 2.13% 0.6~%: 0.~% 0.41% 0.15% ].~% 0.~ ].02% 0.61% 0.~% 2.~% 3.81% 0.81% 1.27~ 0.10% 0,]0% 0.~% 0.15% 0.~"~ 0.15% . . . I BIT RECORD iBP EX.P LORAT ON WEST GWYDYR #1 PRUDHOE BAY FIELD II ! i! JETS DEPTH DEPTH i FTG HRS ROP WOB ~' RPM PP GRADE BIT SIZE ii TYPE I SER NO. ~ ~,, t ,, i' p!' ! ~' # - ~' ! i' IN OUT I Avg Hi-Lo-Avg'~ Hi-Lo-Avg Hi-Lo-Avg I - O - D - L - B - G - OT - R 1 ~, 131/2 , SMITH MAISL ~! LHO509 ~ 3x18 60 i 3548 I 3488 47.26 , 73.8 17-0.5-8 i 72-28-62 1993-701-1350 2-2-WT-A-E-1-ER-PTD ..................... ,:~ .................... ;, ................................................................................................................. , !! ............................................................................. ~ ............................. ~ ................................ ,;, ......................... ~ .................................... , ............................................................ ~i 2937 35.86 81.9 25-0.4-11 I 87-0-70 2198-1220-1700 3-3-WT-A-E-1-FC-HRS 2 97/8 HTC MX-C1 ! F81ZS i{ 3x18, lx10 3548 6455 'i: ..................................................... 3 97/8 GEO S71BHPX i JR8389 i 6x11, 2x12 6485 7683 t 1198 38.51 31.1 21-0.4-8.5 i 96-0-62 2520-1580-2166 1-0-BU-A-X-1-ER-PR 4 97/8 ~ HTC MX-C1 'I F48ZD i 3x18, lx10 ~ 7683 i 8471 ~',~788 26.66 29.6 ' 38-8-28 81-0-70 2326-1428-1830 6-6-WT-A-E-1-N0-HRS 3RR 97/8 GEO S71BHPX ! JR8389 ;,!6x11, 2x12 8471 8780 I 309 7.07 43.7 35-4-17 i 92-0-72 3035-2011-2757 I-0-ER-A-X-I-PN-LOG 6 ~ 97/8 HYCALOG DS70PVN ;',23011.00 ~ 6x13 8780 11030 : 2250 ~ 45.66 49.3 . 2t-1-11 ~ ~ ,. . ~ ~ . . .............. , ............................................................. ; ~ ................................ : ................................... :; ............................... ,:,:~- ~: ~ i!,,,.,,:~,~lr'l r~,.:,.'~!~',,a ~ ;,'?:' WEST GWYDYR NO. 1 DAILY MUD REPORTS NORTH SLOPE, ALASKA Data from Baroid i,.:::! i i i ii ii i i i i i i ii iii DATE DEPTH MW VIS PV YP GELS FL F~LTER SOLIDS SAND pH C~- OIL Ppg CAKE % % ppm ii i i i i i i i i i i 1128/00 80' 8.5 250 13 60 48150 10.4 310 2 0 9.5 600 0198.0 ,, 1129100 833' 8.9 310 25 68 66~84 10.4 310 4.5 1.5 9 500 0195.5 1130100 2,234' 9.6 260 42 68 30~57 8.6 2/0 9.5 2 8.5 500 0190.5 1131/00 3,548' 10.0 92 36 29 14/40 5.4 2/0 10.5 3 8.5 700 0~89.5 211/00 3,548' 10.0 82 20 20 12140 5.6 2/0 10.5 3 8.5 700 0189.5 ,, 2~2~00 3,548' 10.2 47 7 16 618 6.2 110 7.2 0 9.5 15000 0/92.0 2~3~00 4,506' 10.2 43 11 29 14/17 9.6 110 8.2 0.5 9 14500 0191.0 2~4~00 6,000' 10.2 51 13 36 20136 9.6 2/0 7.5 0.35 9 46000 .05189.5 215100 6,485' 10.2 48 12 23 14126 9.8 2/0 8.7 0.25 8.5 14800 0.5190.0 2/6100 6,800' 10.2 44 10 29 25~38 9.6 2/0 9.2 TRC 9.3 15200 0.5~89.5 2~7~00 7,306' 10.3 42 12 18 11128 7.6 113 9.7 TRC 8.5 15200 0.5189.0 2~8~00 7,626' 10.4 54 15 16 15/32 5.4 113 9.2 TRC 8.5 15400 0.5189.5 , 2/9/00 7,990' 10.4 46 15 19 17136 4.6 113 9.6 TRC 9.4 16800 0.5/89.0 2/10100 8,471' 10.4 44 14 14 8~24 4.5 113 9.2 TRC 9.5 15400 0.5189.5 2/11100 8,690' 10.4 47 17 22 15~38 4.0 1/3 9.7 0.125 9.5 15600 0.5189.0 ,, 2/12/00 8,780' 10.4 47 12 18 17130 4.4 2/4 9.8 0.25 8.2 14000 0.5/89.0 2/13/00 9,230' 10.4 55 17 24 11/30 4.0 1/3 11.2 0.25 8.8 14500 1.0~87.0 2/14/00 9,992' 10.4 72 27 38 19141 4.0 214 10.7 0.25 8.9 15000 1.5187.0 2/15100 10,800' 10.4 44 14 20 14/26 4.2 214 9.2 0.25 8.9 14500 1.0189.0 2/16~00 11,030' 10.4 47 13 16 14/24 4.5 2/4 9.3 0.25 8.5 14000 1.0189.0 2/17~00 11,030' 10.6 54 14 28 24~33 4.5 214 10.2 0.25 8.3 14500 1.0/88.0 Sperry-Sun Drilling Services Survey Report for Rig Surveys - West Gwydyr #f North Slope Alaska Alaska State Plane 4 EXPLORATION GB Measured Depth (ft) 0.00 110.55 388.28 481.53 572.98 756.71 945.31 1041.87 1137.45 1231.52 1326.56 1419.48 1515.13 1608.86 1703.69 1795.04 1891.68 1985.54 2082.13 2174.97 2267.39 2363.61 2461.21 2556.68 2653.55 2749.18 2843.05 2936.61 3031.97 3127.12 3315.71 3409.49 3487.51 3775.97 3970.80 4065.24 4160.00 Incl. 0.000 0.050 o.110 0.060 0.210 0.300 0.380 0.400 0.820 0.890 0.930 0.410 0.200 0.370 0.720 0.930 0.800 1,010 0.320 0.160 0.090 0.090 0.110 0.360 0.260 0.220 0.190 0.450 0.330 0.190 0.310 0.190 0.240 0.180 0.180 0.230 0.260 0.090 0.210 0.280 0.220 0.210 0.210 0.050 0.090 0.000 9.310 171.130 156.810 174.040 144.520 178.600 187.760 198.960 194.340 194.780 191.440 169.030 137.100 147.410 155.850 171.110 118.580 113.130 24.160 36.250 153.720 124.030 116.970 112.310 74.710 45.810 75.600 22.410 312.310 322.880 332.510 7.700 339.080 45.640 30.490 30.610 2.900 Vertical Depth (ft) 0.00 110.55 388.28 481.53 756.70 850.81 945.28 1041.83 1137.41 1231.48 1326.51 1419.42 1515.06 1608.78 1703,61 1794.95 1891.57 1985.45 2082.04 2174.88 2363.52 2481.12 2556.59 2749.09 2842.95 2936.51 3031.87 3127.02 3220.74 3315.61 3409.39 3487.41 3591.99 3775.87 3970.70 4065.14 4159.90 Northlngs 0.00 N 0.05 N 0.00 N 0.13S 0.35 S 0.71 S 1.21 S 1.85 S 2.77 $ 4.11 S '5.57 S 6.63 S 7.10S 7.55S 8.29 S 9.36 S 10.62 S 12.03 S 12.99 S 13.16 S 13.14 S 13.01 S 13.04 S 13.28 S 13.54 S 13.71 S 13.73 S 13.56 S 13.63 S 13.57 S 13.34 S 13.12 S 12.90 S 12.61 S 12.40 S 12.11 S 11.73 S 11.50S 11.29S 10.97 S 10.63 S 10.29 S 9.96S 9.75 S ' 9.76 S Vertical Dogleg Eastlngs Sect]on Rate (ft) (fi) (°/lOOft) 0.00 E 0.03 0.01 E 0.05 0.045 0.03 E 0.01 0.169 0.06 E -0,09 0.050 0.10 E -0.28 0.164 0.26 E -0.55 0.168 0.40 E -0.94 0.233 0.37 E -1.54 0.070 0.12 E -2.48 0.484 0.28W -3.87 0.104 0.68 W -5.35 0.043 1.02 W -6.47 0.557 1.21 W -6.98 0.235 1.19 W -7.38 0.213 0.72 W -7.87 0.474 0.08 E -8.51 0.276 0.77 E -9.39 0.190 1.17 E -10.52 0.339 1.53 E -11.24 0.901 1.87 E -11.26 0.177 2.02 E -11.18 0.189 2.10 E -11.04 0.020 2.18 E -11.02 0.177 2.47 E -11'.13 0.291 2.89 E -11.19 0.116 3.26 E -11.20 0.046 3.59 E -11.09 0.138 4.11 E -10.81 0.278 4.77 E -10.51 0.127 5.20 E -10.28 0.170 5.52 E -9.94 0.167 5.86 E -9.61 0.185 6.09 E -9.31 0.207 6.05 E -9.06 0.259 5.85 E -8.94 0.035 5.68 E -8.75 0.064 5.62 E -8.43 0.161 5.62 E -8.22 0.238 5.73 E -7.98 0.184 5.97 E -7.59 0.100 6.17E -7.20 0.067 6.34 E -8.82 0.033 6.41 E -6.49 0.075 6.41 E -6.30 0.173 6.34 E -6.34 0.127 f4 February, 2000. f9:32 - f - DrtllQuest f. OS. O4e Sperry-Sun Drifting Services Survey Report for Rig Surveys. West Gwydyr #1 North Slope Alaska Alaska State Plane 4 EXPLORATION GB Measured Depth Incl. 4254.79 0.090 4349.27 0.120 ~??.1.67 0,180 4528.40 0.120 4621.06 0.130 4716.80 0.130 4809.94 0.210 4906.92 0.190 5001.26 0.230 5189.64 0,250 5284.37 0.410 5378.42 0.410 5680.28 0.150 5755.71 0.170 5848.79 0.160 5944.28 0.350 6041.89 0.430 6137.12 2.110 6167.06 4.000 6200.49 5.240 6232.30 5.410 6326.52 6,860 6419.82 10.140 6515.08 10,550 6580.26 13.200 6609.11 14.490 6701.85 16.890 6796.31 19.500 6891.37 22,230 6984.53 23,750 7078.39 27,250 7176.80 30.210 7366.90 35,110 7557.41 35,110 7618.32 35,350 7650.45 35.570 7746.41 34.810 7791.10 33.400 7935.18 31.930 169.820 115.670 109.620 103.700 89.00O 129.480 125.150 110.890 111.260 116.030 115.750 131,210 135.350 120.920 82.130 80.750 82.760 137.730 163.970 154.320 24,550 19.970 19,870 21.870 24.640 24.330 28.530 28.730 .29.790 31.870 28,780 25.280 27.060 26.320 27.070 26.390 25,570 25.650 25.050 Vertical Depth 4254.69 4349.17 4441.57 4528.30 4716.70 4906.81 5001.15 5189.53 5264.26 5378.31 5471.94 5565.28 5660.16 5755.59 5944.16 6041.77 6136.98 6166.88 6200.20 6231.87 6325.55 6417.81 6511.52 6575.30 6603.31 6692.59 6871.14 6956.90 7041.60 7127.89 7286.17 7363.19 7442.56 7492.31 7518.48 7596.90 7633.91 7675.43 7755.53 Northings 9.88S 10.00 S 10.09 S 10.15 S 10.17 S 10.24 S 10.41 S 10.57 S 10.69 S 10.86 S 11.05 S 11,36S 11.83 S 12.23 S 12.37 S 12"32 S 12.28 $ 12.36 S 12.74 S 13.35 S 12.08 S 10.60 S 8.07 S 5.30S 4.10N 16.79 N 32.43 N 44.66 N 50.94 N 73.35 N 99.24 N 128.78 N 159.99 N 194.68 N 235.92 N 281.48 N 329.71 N 377.95 N 427.27 N 458.68 N 475.31 N 524.70 N 547.22 N 571.45 N 616.97 N Vertical Dogleg Eastings Section Rate (ft) (ft) ('/100ft) 6.30 E -6.47 0.094 6.40 E -6.53 0.105 6.62 E -6.52 0,067 6.84 E -6.49 0.071 7.04 E -6.43 0,036 7.23 E -6.42 0.094 7.45 E -6.46 0.087 7.75 E -6.50 0.055 8.07 E -6.49 0.042 8.45 E -6.48 0,058 8.64 E -6.50 0.032 9.29 E -6.61 0.192 9.77 E -6.83 0.031 10.29 E -6.99 0.109 10.80 E -6.91 0.271 11.15 E -6.72 0.137 11.41 E -6.56 0.022 11.64 E -6.56 0.164 11.81 E -6.63 0,229 12.05 E -7.30 0.106 12.93 E -5.78 2.528 13.52 E -4.18 6.351 14.45 E -1.50 3.711 15.46 E 1.45 0.535 19.07 E 11.50 1.555 24.46 E 25.29 3.529 31.38 E 42.39 0.431 36.g0 E 65.80 4.072 39.76 E 62.71 4.479 50.98 E 87.74 2.861 65.11 E 117.14 2,764 81.68 E 150.65 2,899 100.34 E 186.97 1,850 121.03 E 227.08 3.837 144.19 E 274.17 3,056 168.16 E 325.55 4.672 191.74 E 379~0 1.103 215.07 E 432.75 0.895 239.89 E 487.90 0.720 255.67 E 523.00 0.804 264.05 E 541.62 1.517 288.92 E 596.65 0,891 299.90 E 621.89 3.319 311.51 E 648.75 2.024 333.08 E 699.11 0.601 14 February, 2000.19:32 .2 - DrfllQuest 1.06.04e Sperry-Sun Drilling Services Survey Report for Rig Surveys - West Gwydyr #~ North Slope Alaska Alaska State Plane 4 EXPLORATION GB Measured Vertical Depth Incl. Azim. Depth Northings Eastlngs (fi) (it) (It) (It) 8029.03 33.2CJ0 25.110 7834.58 662.78 N 354.52 E 8084.88 33.860 24.420 7881.12 690.82 N 367.46 E 8124.52 33.160 24.6cJ0 7914.17 710.73 N 378.55 E 8218.61 33.190 24.410 7992.92 757.58 N 397.94 E 8315.05 33.940 20.850 8073.29 806.76 N 418.44 E 8408.37 32.330 20.150 8151.43 854.54 N 436.31 E 8498.91 33.770 19.840 8227.32 900.94 N 453.19 E 8596.13 32.910 19.250 8308.54 951.29 N 471.07 E 8686.46 31.350 18.710 8385.03 996.72 N 486.69 E 8784.57 31.860 19.170 8468.59 1045.35 N 503.38 E 8878.71 31.300 18.900 8548.79 1091.95 N 519.46 E 8978.18 30.820 19.700 8632.28 1139.41 N 536.05 E 9070.33 29.760 20.760 8713.58 1183.97 N 552.50 E 9160.43 28.810 22.030 8792.17 1225.01 N 568.57 E 9257.81 27.600 22.040 8877.98 1267.67 N 585.83 E 9352.53 27.400 22.070 8962.00 1308.20 N 602.25 E 9445.85 27.370 22.920 9044.86 1347.88 N 618.68 E 9535.19 27.210 23.020 9124.26 1385.58 N 634.68 E 9635.23 26.410 22.760 9213.54 1427.14 N 652.21 E 9731.11 25.900 22.350 9299.61 1466.17 N 668.43 E 9826.28 26.290 21.980 9385.07 1504.94 N 684.22 E 9920.16 25.020 22.430 9469.70 1542.57 N 699.58 E 10016.04 23.900 23.490 9556.97 1579.13 N 715.05 E 10109.91 23.900 23.620 9642.79 1613.99. N 730.25 E 10205.50 22.380 23.940 9730.69 1648.37 N 745.40 E 10301.27 21.450 25.010 9819.54 1680.90 N 760.20 E 10394.51 20.030 25.480 9906.73 1710.77 N 774.28 E 10488.46 18.520 25.970 9995.41 1738.70 N 787.73 E 10579.15 17.250 26.480 10081.72 1763.69 N 800.04 E 10679.96 16.770 26.810 10178.12 1790.05 N 813.26 E 10771.62 16.770 27.470 10265.68 1813.59 N 825.32 E 10865.85 16.790 .27.860 10356.10 1837.68 N 837.95 E 10962.25 17.060 27.250 10448.32 1862.56 N 850.94 E 11030.00 17.060 27.250 10513.09 1880.23 N 860.04 E Vertical Dogleg Section Rate (It) (°/lOOit) 749.57 1.450 780.58 1.228 802.44 1.805 853.92 0.166 907.21 2.184 958.12 1.773 1007.38 1.601 1060.65 0.945 1105.50 1.756 115g.72 0.575 1208.83 0.614 1258.95 0.64g 1306.33 1.261 1350.35 1.260 1396.35 1.243 1440.06 0.212 1482.97 0.420 1523.93 0.186 156g.04 0.808 1611.29 0.564 1653.13 0.444 1693.75 1.369 1733.44 1.255 1771.47 0.056 1809.04 1.596 1844.78 1.057 1877.79 1.533 1908.78 1.617 1936.62 1.411 lg66.08 0.486 1992.46 0.2O8 2019.63 0.121 2047.64 0.335 2067.48 0.030 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100fL Vertical Section is from Well and calculated along an Azimuth of 24.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11030.00ft., The Bottom Hole Displacement is 2067.59ft., in the Direction of 24.580° (True). f4 February, 2000. f9:32 - 3, DrlllQuest f, O6,04e POCH WELL LOGGIN'- MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 1-29-00 00:00 Depth: 955' YESTERDAY: BIT INFORMATION: No. Size Type SIN 1 13.50" SMITH MA1SL LH0509 SURVEY DATA: 70' Jets 3-18 Las.t Casing: Surface Conductor 24 Hour Progress: 885' Interval Ftg Hours Condition In Hole DRILLING PARAMETERS: Rate of Penetration 290.1 Torque 40 Weight on Bit 13 Rotary RPM 72 Pump Pressure 1288 DRILLING MUD REPORT: MW 9.1 VIS 290 PV SOL 6.0 OIL 0 SD HIGH at 745 at 725 at 726 at 710 at 887 Report Depth: 36 YP 1.25 MBT GAS SUMMARY: HIGH Total Ditch Gas (units) 11 at 747 Methane (C-1) (ppm) 778 at 747 Ethane (C-2) at Propane (C-3) at Butane (C-4's) at Pentane(C-5's) at Background Gas: 0 units Connection Gas: None units at LITHOLOGY: Conglomerate/Sand Claystone LOW AVERAGE 9.7 at 3599 91.9 fi/hr 10 at 144 33 amp 1 at 921 7.8 Klbs 30 at 71 55 rpm 701 at 174 1198 psi 833' 63 GELS 40/72 FL 9.6 FC 3 20.0 pH 9.5 CI- 600 Ca+ 40 LOW AVERAGE 0 at 71 0.8 units 0 at 71 29 ppm at ppm at ppm at ppm at ppm Trip Gas: units at Wiper Gas: units at ' 95% 5% DAILY ACTIVITY SUMMARY:.. Spud well; drill from surface to report depth. REMARKS: SERVICES PROVIDED: DM[, MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rail / Report By: Craig Silva --EPOCH WELL LOGGINg- MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 1-30-00 00:00 Depth: 2401' YESTERDAY: 955' BIT INFORMATION: No. Size Type SIN 1 13.50" SMITH MA1SLLH0509 Jets 3-18 Last Casing: Surface Conductor 24 Hour Progress: 1446' Interval Ftg Hours Condition 60'-2401' 2341' 40.5 SURVEY DATA: DRILLING PARAMETERS: Rate of Penetration 303.7 Torque 86 Weight on Bit 17 Rotary RPM 71 Pump Pressure 1635 DRILLING MUD REPORT: MW 9.6 VIS 180 PV SOL 9.5 OIL 0 SD HIGH at 2242 at 2364 at 2090 at 1942 at 2348 Report Depth: 36 YP 2.00 MBT GAS SUMMARY: HIGH Total Ditch Gas (units) 8.8 at 1550 Methane (C-1) (ppm) 1748 at 1550 Ethane (C-2) at Propane (C-3) at Butane (C-4's) at Pentane(C-5's) at Background Gas: 2 units Connection Gas: None units at LITHOLOGY: Conglomerate/Sand Claystone 2234' 40 17.5 LOW AVERAGE 17.3 at 2135 73.2 flJhr 0 at Sliding 47 amp 0.5 at 991 8.3 Klbs 28 at 1005 62 rpm 1052 at 1383 1232 psi GELS 41/76 FL 7.2 FC 2 pH 9.2 CI- 600 Ca+ 40 LOW I at 1980 153 at 1980 at at at at Trip Gas: Wiper Gas: 25% 75% AVERAGE 4.0 units 779 ppm ppm ppm ppm ppm units at 26 units at 1857' DAILY ACTIVITY SUMMARY:.. Drill from 955' to 1857; do 18 stand wiper trip; drill from 1857 to report depth. REMARKS: Epoch Personnel on site: 4 SERVICES PROVIDED: DML MUDLOGGING BP Reps: John Rail / Report By: Craig Silva . EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 1-31-00 00:00 Depth: 3548' YESTERDAY: 3548' BIT INFORMATION: No. Size Type SIN I 13.50" SMITH MA1SL LH0509 Jets 3-18 Last Casing: 10 %" at 3533' 24 Hour Progress: 0' Interval Ftg Hours Condition 60'-3548' 3488' 47.26 SURVEY DATA: DRILLING PARAMETERS: HIGH Rate of Penetration 403.5 at 2997 Torque 85 at 3525 Weight on Bit 19 at 3503 Rotary RPM 69 at 3548 Pump Pressure 1993 at 3465 DRILLING MUD REPORT: Report Depth: MW 10.0 VIS 92 PV 36 YP SOL 10.5 OIL 0 SD 3.00 MBT LOW AVERAGE 6.4 at 2762 165.1 fi/hr 26 at 2995 51 amp 0.4 at 2613 8.7 Klbs 32 at 3352 55 rpm 1419 at 2422 1650 psi 3548' 29 GELS 14/40 FL 5.4 FC 2 22.5 pH 8.5 CI- 700 Ca+ 60 GAS SUMMARY: HIGH LOW AVERAGE Total Ditch Gas (units) 248.0 at 2844 I at 2799 13.7 units Methane (C-1) (ppm) 49730 at 2844 220 at 2799 2767 ppm Ethane (C-2) at at ppm Propane (C-3) at at ppm Butane (C-4's) at at ppm Pentane(C-5's) at at ppm Background Gas: 2 units Trip Gas: units at Connection Gas: None units at Wiper Gas: 26 units at 1857' LITHOLOGY: Sand 50% Claystone 50% DAILY ACTIVITY SUMMARY:.. Drill from 2401' to 3548'; circulate bottoms up; pump slug; POOH; lay down BHA; rig up to run 10 %' casing; hold PJSM; start running in casing. REMARKS: SERVICES PROVIDED: DML MUDLOGGING BP Reps: John Rail / Epoch Personnel on site: 4 Report By: Craig Silva ' 'EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION Date: 2-01-00 00:00 Depth: 3548' YESTERDAY: 3548' BIT INFORMATION: No. Size Type SIN WEST GWYDYR #1 Last Casing: 10 %" at 3533' 24 Hour Progress: 0' Jets Interval Ftg Hours Condition SURVEY DATA: DRILLING PARAMETERS: HIGH Rate of Penetration at Torque at Weight on Bit at Rotary RPM at Pump Pressure at DRILLING MUD REPORT: MW 10.0 VIS 82 PV SOL 10.5 OIL 0 SD GAS SUMMARY: HIGH Total Ditch Gas (units) 34.0 Methane (C-1) (ppm) Ethane (C-2) Propane (C-3) Butane (C-4's) Pentane(C-5's) Background Gas: 1 Connection Gas: None LITHOLOGY: NA LOW AVERAGE at fi/hr at amp at Klbs at rpm at psi Report Depth: 3548' 20 YP 20 GELS 12/40 FL 5.6 FC 2 3.00 MBT 22.5 pH 8.5 CI- 700 Ca+ 100 LOW AVERAGE at Cementing Returns at units at at ppm at at ppm at at ppm at at ppm at at ppm units Tdp Gas: units at units at Wiper Gas: units at DAILY ACTIVITY SUMMARY:.. Run 10 %" casing; set shoe at 3533'; do cementing procedures as per B.P.; rig down cementers and casing tools on rig floor; nipple down; nippling up. REMARKS: Epoch Personnel on site: 4 SERVICES PROVIDED: DML MUDLOGGING BP Reps: John Rail / Report By: Craig Silva EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 2-02-00 00:00 Depth: 3568' YESTERDAY: 3548' BIT INFORMATION: No. Size Type SIN 2 9 7/8" HTC MX-C1 F81ZS LaM Casing: 10 %" at 3533' 24 Hour Progress: 20' J~s 3X18,1X10 Interval Ftg Hours Condition 3548'- In Hole SURVEY DATA: DRILLING PARAMETERS: HIGH Rate of Penetration 137.3 at 3550 Torque 82 at 3560 Weight on Bit 14 at 3559 Pump Pressure 1495 at 3563 DRILLING MUD REPORT: Report Depth: MW 10.2 VIS 47 PV 7 YP SOL 7.2 OIL 0 SD 0 MBT GAS SUMMARY: HIGH Total Ditch Gas (units) 5.0 at 3558 Methane (C-1) (ppm) 1068 at 3558 Ethane (0,-2) at Propane (C-3) at Butane (C-4's) at Pentane(C-5's) at Background Gas: 2 units Connection Gas: None units at LITHOLOGY: 3548' 16 0 Claystone 60% Sand 25% Siltstone 10% Carbonaceous Material 5% LOW AVERAGE 36 at 3549 78 fi/hr 22 at 3549 72 amp 3 at 3549 10 rpm 1220 at 3555 1360 psi GELS 6/8 FL 6.2 FC 1 pH 9.5 CI- 15000 Ca+ 80 LOW 2 419 AVERAGE at 3567 3.1 units at 3551 674 ppm at ppm at ppm at ppm at ppm Trip Gas: units at Wiper Gas: units at DAILY ACTIVITY SUMMARY:.. Finish nipple up; test BOPE; pick up BHA: RIH; drill out cement, float collar, cement; pressure test casing; drill cement to shoe; circulate and condition the mud; drill out shoe, 20' of new formation; perform LOT (16.1ppg EMVV); displace old mud with new 3% KCL mud, circulate and condition mud. REMARKS: Epoch Personnel on site: 4 SERVICES PROVIDED: DML MUDLOGGING BP Reps: John Rail/ Repon By: Craig Silva '- EPOCH WELL LOGG1N MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 2-03-00 00:00 Depth: 5348' YESTERDAY: 3568' BIT INFORMATION: No. Size Type SIN 2 9 7~8" HTC MX-C1 F81ZS Last Casing: 10 %" at 3533' 24 Hour Progress: 1780' Jets 3X18, 1X10 Interval Ftg Hours Condition 3548'- In Hole SURVEY DATA: DRILLING PARAMETERS: Rate of Penetration 400.4 Torque 103 Weight on Bit 18 Rotary RPM 78 Pump Pressure 1840 DRILLING MUD REPORT: MW 10.2 VI S 43 PV SOL 7.7 OIL 0.5 SD HIGH at 3863 at 5342 at 4935 at 4008 at 5342 Report Depth: 10 YP .75 MBT GAS SUMMARY: HIGH Total Ditch Gas (units) 179 at 4180 Methane (C-1) (ppm) 35200 at 4185 Ethane (C-2) at Propane (C-3) at Butane (C-4's) at Pentane(C-5's) at Background Gas: 2 units Connection Gas: None units at LITHOLOGY: 5254' 3O 5.0 Sand/Sandstone 60% Claystone 25% Siltstone 15% Carbonaceous Material Tr LOW AVERAGE 4.4 at 4932 161 fi/hr 8 at 3749 46 amp 0.4 at 4549 8.7 Klbs 23 at 4506 69.5 rpm 1338 at 3568 1493 psi GELS 10/13 FL 9.6 FC 1 pH 9.0 CI- 14000 Ca+ 240 LOW 3 550 AVERAGE at 3685 23.3 units at 3685 4709 ppm at ppm at ppm at ppm at ppm Tdp Gas: units at ' Wiper Gas: 70 units at 4506' DAILY ACTIVITY SUMMARY:.. Finish circulate and condition mud 3% KCL mud; drill from 3568' to 4506'; do 12 stand wiper trip; pick up 39 joints of drill pipe running back in; drill from 4506' to report depth. REMARKS: SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rall/Tom Anglen Report By: Craig Silva WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 00:00 Depth: BIT INFORMATION: No. Size Type 2 9 7/8" HTC MX-C1 SURVEY DATA: Depth 6419.82' Inclination 10.14 24.32'E DRILLING PARAMETERS: 2-04-00 6446' YESTERDAY: 5348' SIN F81ZS Rate of Penetration 218.3 Torque 83 Weight on Bit 25 Rotary RPM 87 Pump Pressure 2198 DRILLING MUD REPORT: MW 10.2 VIS 48 PV SOL 9.2 OIL 0.5 SD GAS SUMMARY: HIGH Total Ditch Gas (units) 90 Methane (C-1) (ppm) 21099 Ethane (C-2) 82 Propane (C-3) 27 Butane (C-4's) 60 Pentane(C-5's) 34 Background Gas: 3 Connection Gas: None LITHOLOGY: Last Casing: 10 %" at 3533' 24 Hour Progress: 1098' Jets Interval Ftg Hours Condition 3X18, 1X10 3548'- 2898 34.71 In Hole Azimuth 23.83 TVD 6417.81' Latitude 16.79'N Departure HIGH LOW AVERAGE at 5371 10.2 at 6168 70.7 fi/hr at 5507 0 at Sliding 54 amp at 6329 1.0 at 5600 13.2 Klbs at 5601 0 at Sliding 71 rpm at 6079 1434 at 5767 1943 psi Report Depth: 6411' 13 YP 30 GELS 20/32 FL 10.0 FC 2 .25 MBT 10.0 pH 9.4 CI- 14000 Ca+ 140 LOW AVERAGE at 5708 3 at 6190 15.9 units at 5706 667 at 5489 3677 ppm at 5707 0 at ppm at 5706 0 at ppm at 5707 0 at ppm at 5706 0 at ppm units Tdp Gas: units at units at Wiper Gas: units at Sand/Sandstone 5% Claystone 60% Siltstone 35% DAILY ACTIVITY SUMMARY:.. Drill from 5348' to report depth. REMARKS: Trace to poor oil show in thin interbedded very fine sandstone from 5495' to 5610'. Displayed pale brown oil staining; dull to moderately bright whitish yellow sample fluorescence, pale straw cut in plain light, instant bright yellowish white cut fluorescence with fast wispy streaming, produced a pale brown visible cut dng that fluoresced moderately bdght yellow to goldish yellow. There was no visible sheen on the mud, and no petroleum odor. Individual pieces had fair visible porosity, but overall the sandstone looked tight. SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rall/Tom Anglen Report By: Craig Silva -'EPOCH WELL LOGGI'N MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 00:00 Depth: BIT INFORMATION: No. Size Type 2 9 7~8" HTC MX-C1 3 9 7/8" GEO S71BHPX SURVEY DATA: Depth 6419.82' Inclination 10.14 24.32'E DRILLING PARAMETERS: HIGH Rate of Penetration 39.9 at 6446 Torque 68 at 6446 Weight on Bit 21 at 6486 Rotary RPM 74 at 6473 Pump Pressure 2161 at 6487 DRILLING MUD REPORT: Report Depth: MW 10.2 ViS 48 PV 12 YP SOL 8.7 OIL 0.5 SD .25 MBT 2-05-00 6488' YESTERDAY: 6446' SIN F81ZS JR8389 Jets 3X18, 1X10 6Xl 1, 2X12 Azimuth 23.83 GAS SUMMARY: HIGH Total Ditch Gas (units) 51 at 6488 Methane (C-1) (ppm) 9030 at 6488 Ethane (C-2) 25 at 6488 Propane (C-3) 6 at 6488 Butane (C-4's) 2 at 6488 Pentane(C-5's) 0 at 6488 Background Gas: 4 units Connection Gas: None units at LITHOLOGY: Last Casing: 10 %" at 3533' 24 Hour Progress: 42' Interval Ftg Hours Condition 3548'-6485' 2937 35.86 3-3-WT-A-E-1-FC-HRS 6485'- In Hole 'I'VD 6417.81' Latitude 16.79'N Departure 10.8 17 3.0 48 1223 6485' 23 GELS 11.3 pH LOW 5 1002 8 2 0 0 Claystone 70% Siltstone 30% Sandstone Tr LOW AVERAGE at 6168 32.2 ft/hr at 6486 61.2 amp at 6488 16.3 Klbs at 6486 62 rpm at 6486 1962 psi 14/26 FL 9.8 FC 2 8.5 CI- 14800 Ca+ 220 AVERAGE at 6473 9 units at 6473 1863 ppm at 6486 14 ppm at 6486 3 ppm at I ppm at ppm Trip Gas: 162 units at 6485' Wiper Gas: units at ' DAILY ACTIVITY SUMMARY:.. Ddll from 6446' to 6485; POOH; handle BHA; change bit and mudmotor; service top drive system; slio and cut drill line; RIH with NB~3; wash last stand to bottom; drill from 6485' to report depth. REMARKS: SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rail/Tom Anglen Report By: Craig Silva EPOCH WELL LOGGIN ...... MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 2-06-00 00:00 Depth: 6997' YESTERDAY: 6488' BIT INFORMATION: No. Size Type 3 9 7/8" GEO S71BHPX SURVEY DATA: Depth 6984.53' Inclination 23.75 Azimuth 31.87 SIN Jets JR8389 6Xll, 2)(12 DRILLING PARAMETERS: HIGH Rate of Penetration 113.6 at 6501 Torque 132 at 6870 Weight on Bit 17 at 6733 Rotary RPM 88 at 6494 Pump Pressure 2517 at 6964 DRILLING MUD REPORT: Report Depth: MW 10.2 VIS 44 PV 10 YP SOL 9.2 OIL 0.5 SD Tr MBT GAS SUMMARY: HIGH Total Ditch Gas (units) 59 at 6489 Methane (C-1) (ppm) 9719 at 6489 Ethane (C-2) 129 at 6821 Propane (C-3) 58 at 6781 Butane (C-4's) 9 at 6770 Pentane(C-5's) 10 at 6882 Background Gas: 7 units Connection Gas: None units at LITHOLOGY: Last Casing: 10 %" at 3533' 24 Hour Progress: 509' Interval Ftg Hours Condition 6485'-6997' 512 16.66 In Hole TVD 6956.89' Latitude 160.08'N LOW 4.1 at 6493 0 at Sliding 0.4 at 6664 0 at Sliding 1660 at 6790 6800' 29 GELS 25/38 FL 11.0 pH 9.3 Cl- LOW 3 at 6834 640 at 6778 10 at 6757 3 at 6990 0 at 0 at Tdp Gas: Wiper Gas: Claystone 60% Siltstone 35% Sandstone 5% Departure 100.15'E AVERAGE 37.3 fi/hr 35.5 amp 8.4 Klbs 12.2 rpm 2177 psi 9.6 FC 2 15200 Ca+ 200 AVERAGE 16.4 units 3119 ppm 36 ppm 11 ppm 3 ppm I ppm 162 units at 6485' units at ' DAILY ACTIVITY SUMMARY:.. Drill from 6488' to report depth. REMARKS: SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rail/Tom Anglen Craig Silva Report By: ' 'EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 00:00 Depth: BIT INFORMATION: No. Size Type 3 9 7/8" GEO S71BHPX SURVEY DATA: 2-07-00 7625' YESTERDAY: 6997' La,~t Casing: 10 %" at 3533' 24 Hour Progress: 628' Depth 7557.41' SIN Jets Interval JR8389 6Xll, 2X12 6485'-7625' Inclination 35.11 Azimuth 27.06 TVD 7442.54' DRILLING PARAMETERS: HiGH Rate of Penetration 258.4 at 7378 Torque 125 at 7559 Weight on Bit 20 at 7600 Rotary RPM 96 at 7559 Pump Pressure 2497 at 7306 DRILLING MUD REPORT: Report Depth: MW 10.4 VIS 43 PV 13 YP SOL 10.2 OIL 0.5 SD 0.1 MBT 8.4 0 1.0 0 1580 7625' 24 GELS 10.0 pH LOW 8 1417 2O 5 1 0 GAS SUMMARY: HIGH Total Ditch Gas (units) 119 at 7318 Methane (C-1) (ppm) 23608 at 7317 Ethane (C-2) 421 at 7476 Propane (C-3) 119 at 7476 Butane (C-4's) 92 at 7474 Pentane(C-5's) 25 at 7625 Background Gas: 8 units Connection Gas: None units at Shale 98% Volcanic Ash (Bentonite) 2% Claystone,Siltstone,Sandstone Tr LITHOLOGY: Ftg Hours Condition 1140 33.51 In Hole Latitude 427.36'N Departure 239.70'E LOW AVERAGE at 6493 48.3 fi/hr at Sliding 53.0 amp at 7317 7.2 Klbs at Sliding 38.8 rpm at 7531 2162 psi 20/36 FL 5.6 FC 1 8.5 CI- 15000 Ca+ 200 AVERAGE at 7024 35.6 units at 7605 6842 ppm at 7024 136 ppm at 7065 34 ppm at 7491 14 ppm at 3 ppm Tdp Gas: 300 units at 7625' Wiper Gas: units at ' DAILY ACTIVITY SUMMARY:.. Drill from 6997' to 7025'; circulate; do 25stand wiper trip to 5250'; run in to 5900' and pump sweep. REMARKS: SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rail/Tom Anglen Report By: Craig Silva ' -'EPOCH WELL LOGG1N MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 00:00 Depth: BIT INFORMATION: No. Size Type 3 9 7/8" GEO 871BHPX 4 9 7/8" HTC MX-C1 SURVEY DATA: 2-08-00 7705' YESTERDAY: 7625' SIN Jets JR8389 6X11, 2X12 F48ZD 3X18, 1X10 Depth 7650.45' Inclination 35.57 Azimuth 27.07 DRILLING PARAMETERS: HIGH Rate of Penetration 149.0 at 7693 Torque 101 at 7695 Weight on Bit 30 at 7697 Rotary RPM 88 at 7651 Pump Pressure 2081 at 7690 DRILLING MUD REPORT: Report Depth: MW 10.4 VI S 54 PV 15 YP SOL 9.2 OIL 0.5 SD Tr MBT Last Casing: 10 %" at 3533' 24 Hour Progress: 75' Interval Ftg Hours Condition 6485'-7683' 1198' 38.51 1-0-BU-A-X-1-ER-PR 7683'-7705' 22' 0.40 In Hole TVD 7518.47' Latitude 475.40'N Departure 254.00'E LOW AVERAGE 3.9 at 7650 34.6 ft/hr 19 at 7660 75.3 amp 3 at 7627 14.5 Klbs 24 at 7660 62.6 rpm 1662 at 7660 1912 psi 7625' 16 GELS 15/32 FL 5.4 FC 1 10.0 pH 8.5 CI- 15400 Ca+ 220 GAS SUMMARY: HIGH Total Ditch Gas (units) 96 at 7703 Methane (C-1) (ppm) 18439 at 7703 Ethane (C-2) 420 at 7636 Propane (C-3) 136 at 7630 Butane (C-4's) 149 at 7637 Pentane(C-5's) 251 at 7639 Background Gas: 8 units Connection Gas: None units at LOW AVERAGE 16 at 7659 47.9 units 3184 at 7659 9086 ppm 102 at 7659 253 ppm 43 at 7673 85 ppm 19 at 7675 61 ppm 5 at 7689 46 ppm Trip Gas: 220 units at 7683' Wiper Gas: units at ' LITHOLOGY: Shale 70% Claystone, Siltstone 28% Volcanic Ash (Bentonite) 2% Sandstone Tr DAILY ACTIVITY SUMMARY:.. Drill from 7625' to 7683'; circulate bottoms up; POOH; download MWD; test BOPE; change bit and mudmotor; make up new BHA; RIH; fill pipe and test MWD at shoe; RIH ream last stand to bottom; drill from 7683' to report depth. REMARKS: SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rail/Tom Anglen Report By: Craig Silva ' EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 00:00 Depth: BIT INFORMATION: No. Size Type 3 9 7/8" GEO S71BHPX 4 9 7/8" HTC MX-C1 SURVEY DATA: 2-09-00 8240' YESTERDAY: 7705' Last Casing: 10 %" at 3533' 24 Hour Progress' 535' Depth 8218.61' SIN Jets Interval JR8389 6X11, 2X12 6485'-7683' F48ZD 3X18, 1X10 7683'-8240' Inclination 33.19 Azimuth 24.41 TVD 7992.95' DRILLING PARAMETERS: HIGH Rate of Penetration 111.7 at 7809 Torque 102 at 7797 Weight on Bit 38 at 8228 Rotary RPM 81 at 8078 Pump Pressure 2326 at 8020 DRILLING MUD REPORT: Report Depth: MW 10.4 VIS 46 PV 13 YP SOL 10.2 OIL 0.5 SD Tr MBT 7.4 0 8 0 1428 8219' 25 GELS 10.0 pH LOW 4 757 26 8 3 1 8281' GAS SUMMARY: HIGH Total Ditch Gas (units) 158 at 8240 Methane (C-1) (ppm) 29964 at 8240 Ethane (C-2) 1328 at 8240 Propane (C-3) 606 at 8240 Butane (C-4's) 290 at 8240 Pentane(C-5's) 177 at 8240 Background Gas: 35 units Connection Gas: 66 units at Shale 65% Claystone, Siltstone 20% Volcanic Ash (Bentonite) 5% Sandstone/Sand 10% LITHOLOGY: DAILY ACTIVITY SUMMARY:.. Drill from 7705' to report depth. Ftg Hours Condition 1198' 38.51 1-0-BU-A-X-1-ER-PR 557' 17.86 In Hole Latitude 757.59'N Departure 397.89'E LOW AVERAGE at 7859 40.3 ft/hr at Sliding 62.7 amp at 8073 27.7 Klbs at Sliding 69 rpm at 8037 1827 psi 24/40 FL 4.8 FC 1 8.9 Cl- 14500 Ca+ 120 AVERAGE at 7859 37.6 units at 7859 6677 ppm at 7859 192 ppm at 7859 77 ppm at 7859 43 ppm at 7859 19 ppm Tdp Gas: 220 units at 7683' Wiper Gas: units at ' (100% at report depth) REMARKS: Trace to poor oil shows from 8140' to 8240'; may be marginally fair after 8230'. Overall poor sample fluorescence, generally sparse (5-25%), and very dull yellow;, instant to surprisingly slow pale to modrately bdght whitish yellow cut fluorescence with limited slow wispy streaming; colorless to very pale straw cuts in plain light; moderately bdght whitish yellow residual dng fluorescence; very pale brown to not visible dry cut ring. Appears mix of fair to poor visible porosity; note that the sandstones from 8220' to 8240' are often calcite cemented. There is also a physically large volume of clay in the samples from 8140' to 8230'. SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rall/Tom Anglen Report By: Craig Silva '-EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 00:00 Depth: BIT INFORMATION: No. Size Type 4 9 7/8" HTC MX-C1 HRS 3RR 9 7/8" GEO S71BHPX SURVEY DATA: 2-10-00 8471' YESTERDAY: 8240' SIN Jets F48ZD 3X18, 1X10 JR8389 6Xll, 2X12 Las.t Casing: 10 %" at 3533' 24 Hour Progress: 231' Interval Ftg Hours Condition 7683'-8471' 788' 26.66 6-6-WT-A-E-I-NO- 8240'- ' ' In Hole Depth 8408.37' Inclination 32.33 Azimuth 20.15 TVD 8152.42' DRILLING PARAMETERS: Rate of Penetration 118.3 Torque 103 Weight on Bit 38 Rotary RPM 52 Pump Pressure 2225 DRILLING MUD REPORT: MW 10.4 ViS 44 PV SOL 10.2 OIL 0.5 SD HIGH at 8300 at 8269 at 8250 at 8269 at 8288 Report Depth: 14 YP Tr MBT GAS SUMMARY: HIGH Total Ditch Gas (units) 190 Methane (C-1) (ppm) 33033 Ethane (C-2) 1477 Propane (C-3) 681 Butane (C-4's) 329 Pentane(C-5's) 203 Background Gas: 40 Connection Gas: 46 7.8 0 17 0 1572 8471' 14 GELS 10.0 pH Latitude 852.61'N Departure 436.97'E LOW AVERAGE at 8324 38.6 ft/hr at Sliding 42.3 amp at 8254 33.2 Klbs at Sliding 15.5 rpm at 8257 1388 psi 8/24 FL 4.5 FC 1 9.5 CI- 15400 Ca+ 100 LOW AVERAGE at 8249 36 at 8259 81.5 units at 8249 5799 at 8259 13680 ppm at 8249 246 at 8259 543 ppm at 8249 110 at 8331 267 ppm at 8249 61 at 8336 141 ppm at 8249 29 at 8415 68 ppm units Trip Gas: units at units at 8376' Wiper Gas: units at LITHOLOGY: Sandstone/Sand 50% Claystone 50% DAILY ACTIVITY SUMMARY:.. Drill from 8240' to 8471'; circulate sweep around; POOH; handle BHA; change out bit and mudmotor; RIH; pick up drill pipe; fill pipe and test MWD tool at shoe; service Topdrive; slip and cut drill line; RIH. REMARKS: Poor oil shows from 8240' to 8471'. Overall very poor to no sample fluorescence, generally sparse (5-10%), and very dull yellow; but interval 8350'-8380' had abundant very dull yellow sample fluorescence (from well sorted very fine sandstone with good to fair visible porosity). Repeated slow pale to moderately bdght whitish yellow cut fluorescence with limited very slow wispy streaming; colorless to very pale straw cuts in plain light; moderately bdght whitish yellow residual dng fluorescence; very pale brown to non visible dry cut dng. Interval 8350-8380' had very fine "clean-looking" stained sandstone that produced very fast to instant moderately bright to bdght whitish yellow cut fluorescence and a pale to marginally bright residual fluorescence. Overall appears a mix of poor to fair to locally good visible porosity. Note that many sandstone fragments are calcite/siderite cemented, and there is an unexpectedly large volume of clay in the samples throughout the 8240' to 8470' show zone. SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rall/Tom Anglen Report By: Craig Silva 'EPOCH WELL LOGG1N MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 00:00 Depth: BIT INFORMATION: No. Size Type 3RR 9 7/8' GEO S71BHPX SURVEY DATA: 2-11-00 8780' YESTERDAY: 8471' Last Casing: 10 %" at 3533' 24 Hour Progress: 309' Depth 8686.46' SIN Jets Interval JR8389 6X11, 2X12 8471'-8779' Inclination 31.35 Azimuth 18.71 TVD 8385.11' DRILLING PARAMETERS: HIGH Rate of Penetration 157.7 at 8616 5.7 Torque 246 at 8618 0 Weight on Bit 35 at 8773 3.5 Rotary RPM 92 at 8777 0 Pump Pressure 3035 at 8572 2011 DRILLING MUD REPORT: Report Depth: 8780' MW 10.5 ViS 62 PV 16 YP 25 GELS SOL 11.2 OIL 0.5 SD 0.25 MBT 10.0 pH Ftg Hours Condition 308' 7.07 In Hole Latitude 996.54'N Departure486.73'E LOW AVERAGE at 8773 73.4 ft/hr at Sliding 153.4 amp at 8758 16.7 Klbs at Sliding 43.7 rpm at 8745 2757 psi 22/46 FL 9.0 CI- 4.0 FC 1 14700 Ca+ 100 GAS SUMMARY: HIGH LOW Total Ditch Gas (units) 207 at 8610 15 Methane (C-1) (ppm) 33033 at 8610 2158 Ethane (C-2) 1477 at 8610 79 Propane (C-3) 681 at 8610 47 Butane (C-4's) 329 at 8610 31 Pentane(C-5's) 203 at 8610 12 Background Gas: 20 units Connection Gas: 30 units at 8567' AVERAGE at 8773 80.1 units at 8773 14086 ppm at 8773 544 ppm at 8773 253 ppm at 8773 113 ppm at 8732 39 ppm Tdp Gas: 472 units at 8471' Wiper Gas: units at ' LITHOLOGY: Siltstone 60% Sandstone/Sand 25% Claystone 15% DAILY ACTIVITY SUMMARY:.. RIH; ream last stand to bottom; drill from 8471' to 8780'; circulate bottoms up; do 18stand wiper trip; wash to bottom from 8200'; circulate bottoms up; pump sweep and circulate around; POOH. REMARKS: Poor oil shows from 8470' to 8700'. Poor to very poor sample fluorescence, spotty to 50% very dull yellow, (and always from well sorted very fine sandstone with good to fair visible porosity). Colorless to pale straw or faint brown visible cuts in plain light. Cut fluorescence ranges from slow very pale with limited very slow wispy streaming to instant bdght whitish yellow with moderately fast broad diffuse streaming. The dry residual cut ring was often very pale brown to pale brown in plain light, and fluoresced moderately bright to bright whitish yellow. Note that all of the fast bright cuts were from very fine well sorted stained sandstone with good to fair visible porosity. Diverse mix of very fine to fine sandstone types and trace to spotty sandstone and disaggregated sand that ranges to granule size. Visible porosity ranges from very poor to good. Note that many sandstone fragments are calcite/siderite cemented, and there a large volume of siltstone and clay in the samples throughout the 8470' to 8700' show zone. SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rall/Tom Anglen Report By: Craig Silva -EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 2-12-00 00:00 Depth: 8780' YESTERDAY: 8780' BIT INFORMATION: No. Size Type SIN 3RR 9 7/8" GEO S71BHP× JR8389 6 9 7/8" HYC DS70PVN 23011 SURVEY DATA: Depth 8686.46' Inclination 31.35 Azimuth 18.71 DRILLING PARAMETERS: HIGH Rate of Penetration at Torque at Weight on Bit at Rotary RPM at Pump Pressure at DRILLING MUD REPORT: MW 10.4 VIS 47 PV SOL 9.8 OIL 0.5 SD 24 Hour Progress: GAS SUMMARY: HIGH Total Ditch Gas (units) 52 Methane (C-1) (ppm) Ethane (C-2) Propane (C-3) Butane (C-4's) Pentane(C-5's) Background Gas: 10 Connection Gas: Lagt Casing: 10 %" at 3533' 0' Jets Interval Ftg 6Xll, 2)(12 8471'-8780' 309' 6X13 8780'- Report Depth: 12 YP 0.25 MBT 'I'VD 8385.11' Hours Condition 7.07 1-0-ER-A-X-1-PN-LOG Latitude 996.54'N Departure 486.73'E LOW AVERAGE at fi/hr at amp at Klbs at rpm at psi LITHOLOGY: NA at Filling pipe at at at at at units units at Siltstone Sandstone/Sand Claystone 8780' 18 GELS 10.0 pH LOW 10 17/30 FL 4.4 FC 2 8.2 CI- 14000 Ca+ 100 AVERAGE at Filling pipe 32 units at ppm at ppm at ppm at ppm at ppm Tdp Gas: 326 units at 8780' Wiper Gas: units at ' DAILY ACTIVITY SUMMARY:.. POOH; check for flow at shoe; lay down 30 joints 5" drill pipe; hand BHA; download MWD; lay down MWD and mudmotor; rig up and run wireline logs; clean drip pan under drawworks; service Topdrive; pick up BHA and new PDC bit; load and orient MWD; RIH; pick up 30 joints of drill pipe; RIH to shoe; fill pipe; test MWD; RIH to 6000' fill pipe; RIH. REMARKS: SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rail/Tom Anglen Report By: Craig Silva --EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 2-13-00 00:00 Depth: 9674' YESTERDAY: 8780' BIT INFORMATION: No. Size Type SIN Jets 6 9 7/8" HYC DS70PVN 23011 6X13 SURVEY DATA: Depth 9635.23' Inclination 26.41 Azimuth 22.76 DRILLING PARAMETERS: HIGH Rate of Penetration 147.2 at 9500 Torque 193 at 9509 Weight on Bit 18 at 9156 Rotary RPM 82 at 9262 Pump Pressure 2705 at 9510 DRILLING MUD REPORT: Report Depth: MW 10.4 VIS 47 PV 12 YP SOL 9.8 OIL 0.5 SD 0.25 MBT GAS SUMMARY: HIGH Total Ditch Gas (units) 136 at 9228 Methane (C-1) (ppm) 23986 at 9228 Ethane (C-2) 825 at 9228 Propane (C-3) 484 at 9228 Butane (C-4's) 202 at 9123 Pentane(C-5's) 99 at 9228 Background Gas: 20 units Connection Gas: units at LITHOLOGY: Last Casing: 10 ~A" at 3533' 24 Hour Progress: 894' Interval Ftg Hours Condition 8780'-9674 894' 15.52 In Hole TVD 9214.14' Latitude 1426.26'N Departure 651.82'E LOW AVERAGE at 9494 76.2 ft/hr at Sliding 148 amp at 8965 8.4 Klbs at Sliding 79 rpm at 9329 2282 psi 17/30 FL 8.2 CI- 4.4 FC 2 14000 Ca+ 100 7.3 0 1 0 1542 8780' 18 GELS 10.0 pH LOW 17 2506 75 43 25 4 Shale 80% Siltstone 8% Sandstone 8% Claystone 4% DAILY ACTIVITY SUMMARY:.. RIH; drill from 8780' to report depth. AVERAGE at 9515 59.5 units at 9464 10149 ppm at 9464 316 ppm at 8784 178 ppm at 8784 83 ppm at 9454 33 ppm Tdp Gas: 326 units at 8780' Wiper Gas: units at ' REMARKS: Trace hydrocarbons at 9490' to 9600'; no sample fluorescence; very slow; very dull yellowish white cut fluorescence with no streaming; no visible cut in plain light; very faint pale brown or pale straw residual dng in plain light that fluoresced very dull goldish yellow. Very fine sandstone had both fair and poor visible porosity. Trace show that could be rated as a none show. SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rail/Tom Anglen Report By: Craig Silva EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 2-14-00 00:00 Depth: 10556' YESTERDAY: 9674' BIT INFORMATION: No. Size Type SIN Jets 6 9 7/8' HYC DS70PVN 23011 6X13 SURVEY DATA: Depth 10486.23' Inclination 18.52 Azimuth 25.97 DRILLING PARAMETERS: Rate of Penetration 103.8 Torque 247 Weight on Bit 18 Rotary RPM 85 Pump Pressure 2601 DRILLING MUD REPORT: MW 10.4 VIS 53 PV SOL 9.7 OIL 1.0 SD HIGH at 10074 at 9999 at 9851 at 9814 at 10337 Report Depth: 17 YP 0.25 MBT LaSt Casing: 10 %" at 3533' 24 Hour Progress: 882' Interval Ftg Hours Condition 8780'-10556' 1776' 31.56 In Hole TVD 9995.41' Latitude 1738.73'N LOW 8.7 at 10463 0 at Sliding I at 9991 0 at Sliding 1684 at 10176 10556' 30 GELS 22/35 FL 9.4 pH 9.0 Cl- Departure 782.53'E AVERAGE 80.3 ft/hr 179 amp 11.1 Klbs 78 rpm 2464 psi 4.0 FC 2 15000 Ca+ 80 GAS SUMMARY: HIGH Total Ditch Gas (units) 148 at Methane (C-1) (ppm) 29633 at Ethane (C-2) 1049 at Propane (C-3) 1312 at Butane (C-4's) 861 at Pentane(C-5's) 609 at Background Gas: 32 units Connection Gas: units 10535 10536 10411 10411 10368 10367 at LOW 15 at 9801 2561 at 9801 96 at 9802 97 at 9711 47 at 9721 18 at 9717 Tdp Gas: Wiper Gas: AVERAGE 68.4 units 8960 ppm 472 ppm 500 ppm 352 ppm 200 ppm 326 units at 8780' units at ' LITHOLOGY: Shale 50% Sandstone 25% Siltstone 22% Claystone 3% (100% at report depth) DAILY ACTIVITY SUMMARY:.. Drill from 9674' to 10556'; circulate bottoms up; circulate and condition mud; do 20 stand wiper trip. REMARKS: Trace oil show in very fine sandstone from 9720' to 9990'; spotty very dull to faint yellow sample fluorescence; slow very dull yellowish white cut fluorescence with no streaming; very faint brown to no visible cut in plain light; rare very faint brown residual ring in plain light that fluoresced very pale whitish yellow. Very fine sandstone had both fair and poor visible porosity. Trace show that could be rated as a none show. SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John Rail/Tom Anglen Report By: Craig Silva .... EPOCH WELL LOGGIV .... MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 2-15-00 00:00 Depth: 11030' YESTERDAY: 10556' BIT INFORMATION: No. Size Type SIN Jets 6 9 7/8" HYC DS70PVN 23011 6X13 Last Casing: 10 %" at 3533' 24 Hour Progress:' 474' Interval Ftg Hours Condition 8780'-11030' 2250' 45.66 In Hole SURVEY DATA: (Last survey is a projection to T.D.) Depth 10962.25' Inclination 17.06 Azimuth 27.25 TVD 10448.33' Depth 11030.00' Inclination 17.06 Azimuth 27.25 'I-VD 10513.09' DRILLING PARAMETERS: HIGH Rate of Penetration 103.8 at 10621 6.7 Torque 245 at 11030 166 Weight on Bit 21 at 10643 3 Rotary RPM 79 at 10970 40 Pump Pressure 2490 at 10562 2142 DRILLING MUD REPORT: Report Depth: 11030' MW 10.4 ViS 42 PV 14 YP 19 GELS SOL 9.2 OIL 1.0 SD 0.25 MBT 8.7 pH Latitude 1862.56'N Departure 850.94'E Latitude 1880.23'N Departure 860.04'E LOW AVERAGE at 10712 47.2 ft/hr at 10748 203 amp at 10719 14.8 KIbs at 10842 76 rpm at 11001 2320 psi 13/26 FL 4.3 FC 2 8.7 CI- 14500 Ca+ 120 GAS SUMMARY: HIGH LOW Total Ditch Gas (units) 1241 at 10656 53 Methane (C-1) (ppm) 190694 at 10656 3888 Ethane (C-2) 14999 at 10656 137 Propane (C-3) 10238 at 10656 100 Butane (C-4's) 5530 at 10656 109 Pentane(C-5's) 3804 at 10656 143 Background Gas: 53 units Connection Gas: units at AVERAGE at 11001 208 units at 11001 27311 ppm at 11001 1852 ppm at 11017 1348 ppm at 11017 899 ppm at 11016 739 ppm Trip Gas: units at WiperGas: 238 units at 10556' LITHOLOGY: Sandstone 70% Limestone 15% Shale 15% (100% at T.D.) DAILY ACTIVITY SUMMARY:.. Drill from 9674' to 10556'; circulate bottoms up; circulate and condition mud; do 20 stand wiper trip to 8662'; service Topdrive; RIH; drill from 10556' to 11030' (T.D.); circulate bottoms up; condition mud; POOH; pull 4 'A stands tight the from 8730' to 8330'; continue POOH to 3350' to hang off drill string and test BOPE. REMARKS: Poor oil show in very fine well sorted glauconitic Sag River Sandstone from 10646' to 10626': varying spotty to locally abundant moderately bright yellowish white to greenish yellowish white sample fluorescence; visible pale to very light brown oil staining; no visible cut in plain light; instant bright bluish white to yellowish bluish white cut fluorescence, which generally masks spotty slowly expanding streaming; pale golden brown residual cut in plain light that fluoresced bdght yellow;, upper zone of sand had estimated visual porosities ranging from very poor to good based on amount of calcite cementation. Note show rating downgraded due to lower than anticipated LWD resistivities and visible "tightness" caused by calcite cement. Poor to marginally fair oil show in fine upper to medium upper moderately well sorted Ivishak Sandstone from 10817' to 10870': 30-40% bdght yellow sample fluorescence and 20-40% very dull whitish yellow sample fluorescence; visible irregularly patchy or spotty very light to light brown oil staining; no visible cut in plain light; dominant slow dull to marginally bdght whitish yellow to bluish white cut fluorescence with slow very wide non-milky diffuse streaming; spot cut fluorescence from some individual pieces was fast bdght bluish yellowish white with faster streaming; no visible residual dry cut dng (with rare light brown exceptions) that ranged from dull yellowish gold to bdght yellow. Estimated visual porosities are good or very good. Show ratings downgraded due to Iow LVVD resistivities and apparent wetness. SERVICES PROVIDED: DML MUDLOGGING EPOCH WELL LOGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 2-16-00 00:00 Depth: 11030' YESTERDAY: 11030' BIT INFORMATION: No. Size Type S/N Jets Interval 6 9 7/8" HYC DS70PVN 23011 6X13 8780'-11030' SURVEY DATA: (Last survey is a projection to T.D.) Depth 11030.00' Inclination 17.06 Azimuth 27.25 'I'VD 10513.09' Latitude 1880.23'N Departure 860.04'E DRILLING PARAMETERS: HIGH LOW AVERAGE Rate of Penetration at at ft/hr Torque at at amp Weight on Bit at at Klbs Rotary RPM at at rpm Pump Pressure at at psi DRILLING MUD REPORT: Report Depth: 11030' MW 10.6 VIS 54 PV 14 YP 28 GELS 24/33 FL 4.5 FC 2 SOL 10.2 OIL 1.0 SD 0.25 MBT 8.7 pH 8.4 CI- 14500 Ca+ 120 Last Casing: 10 %" at 3533' 24 Hour Progress:~ 0' Ftg Hours Condition 2250' 45.66 In Hole GAS SUMMARY: HIGH LOW AVERAGE Total Ditch Gas (units) 368 at 11030 22 at 11030 101 units Methane (C-1) (ppm) at at ppm Ethane (C-2) at at ppm Propane (C-3) at at ppm Butane (C-4's) at at ppm Pentane(C-5's) at at ppm Background Gas: 30 units Trip Gas: units at Connection Gas: units at Wiper Gas: 368 units at 11030' LITHOLOGY: DAILY ACTIVITY SUMMARY:.. POOH; work pipe through tight section from 8730' to 8330' (all of Kuparuk A & B Sands); continue POOH to shoe; hang off drill string and test BOPE; slip and cut drill line; RIH; work pipe through tight section from 8190' to 8410' (all of Kupark C and upper part of B Sands); continue RIH to 10935'; break circulation; start ream to bottom; 30' in on ream had high torque, pump pressure; apparent plugged nozzle; continue ream to bottom at 11030'; circulate around high viscosity sweep; POOH; pulled tight 10624' to 10609' (pressured shale section above Sag River Sand); continue POOH; pulled tight through section from 9919' to 9907'(silty zone just above 10' thick discreet Jurassic Sand); continue POOH to 8000'; RIH to 10556' without difficulty; ream from 10556' to 11019'; circulate and reciprocate pipe while building mud weight to 10.6PPG; circulate and complete weight up; POOH; monitor well closely on way out; briefly work pipe through tiny section from 8656' to 8654' (middle of Kuparuk A Sand); continue POOH without difficulty. REMARKS: SERVICES PROVE)ED: DML MUDLOCa3ING Epoch Personnel on site: 4 BP Reps: John Rail / Tom Anglen Report By: Craig Silva .... EPOCH WELL LEGGIN MORNING REPORT BP EXPLORATION WEST GWYDYR #1 Date: 00:00 Depth: BIT INFORMATION: No. Size Type 6 9 7/8" HYC DS70PVN SURVEY DATA: Depth Inclination Azimuth DRILLING PARAMETERS: Rate of Penetration Torque Weight on Bit Rotary RPM Pump Pressure DRILLING MUD REPORT: MW 10.6 VIS 54 PV SOL 10.2 OIL 1.0 SD 2-17-00 11030' YESTERDAY: 11030' Last Casing: 10 %" at 3533' 24 Hour Progress:' 0' GAS SUMMARY: HIGH Total Ditch Gas (units) 198 Methane (C-1) (ppm) Ethane (C-2) Propane (C-3) Butane (C-4's) Pentane(C-5's) Background Gas: 30 Connection Gas: SIN Jets Interval Ftg Hours Condition 23011 6X13 8780'-11030' 2250' 45.66 2-2-WT-A-X-1-NO-TD TVD Latitude Departu re HIGH LOW AVERAGE at at fi/hr at at amp at at Klbs at at rpm at at psi Report Depth: 11030' 14 YP 28 GELS 24/33 FL 4.5 FC 2 0.25 MBT 8.7 pH 8.3 CI- 14500 Ca+ 120 LOW AVERAGE at 11030 28 at 11030 95 units at at ppm at at ppm at at ppm at at ppm at at ppm units Tdp Gas: units at units at Wiper Gas: 198 units at 11030' LITHOLOGY: DAILY ACTIVITY SUMMARY:.. POOH to BHA; lay down BHA; download MWD; lay down mudmotor and MWD; clear dg floor; dg Baker Atlas; run wireline log; monitor well closely during logging; finish log run; lay down and rig down logging tools; pick up muleshoe and 12 joints of drill pipe; RIH; tag at 11013'; circulate bottoms up; rotate and reciprocate; short trip to 10400'; pump cement to set bottom plug; continue Plug and Abandon procedures. REMARKS: SERVICES PROVIDED: DML MUDLOGGING Epoch Personnel on site: 4 BP Reps: John RaH / Tom Anglen Report By: Craig Silva EPOCH WELL LOGGING, INC. SHOW REPORT NO. 1 DEPTHINTERVAL: 5495 TO 5610 (MD) TOTAL FTG' 115 AVERAGES: BEFORE I DURING I AFTER I MAXIMUM I ROP (fph) 70 140 70 207 WOB 11 14 13 17 RPM 66 77 87 87 MUDWT 10.2 10.2 10.2 10.2 22 18 40 3067 3079 8000 7 12 17 5 7 12 11 12 17 9 15 17 8 1670 TOTAL GAS Cl (ppm) C2 (ppm) C3 (ppm) C4 (ppm) C$ (ppm) VISIBLE STAINING: PALE BROWN SAMPLE FLUORESENCE: COLOR: WHITISH YELLOW AMT: 5-50% INTENSITY DULL TO MODERATELY BRIGHT ii VISIBLE CUT: PALE STRAW CUT FLUORESENCE: COLOR: YELLOWISH WHITE INTENSITY BRIGHT QUALITY: INSTANT CUT, FAST WISPY STREAMING VISIBLE RESIDUAL CUT: PALE BROWN CUT RING RESIDUAL CUT FLUORESENCE: COLOR: YELLOW TO GOLDISH YELLOW INTENSITY MODERATELY BRIGHT FORMATION DESCRIPTION: LIGHT GRAY TO VERY LIGHT BROWNISH GRAY; VERY FINE LOWER TO VERY FINE UPPER. WELL SORTED; CROSSES INTO SILT RANGE; SBANG TO ANG; SUBDISCOIDAL TO SUBSPHERICAL; MORE GRAIN SUPPORTED THAN MATRIX SUPPORTED; HAS VISIBLE CLAY-SILT INTERGRAIN "SILICA-FLOUR"; SILTY LITHIC QUARTZ ARENITE RANGING TO SUBLITHIC ARENITE; COMMON MICRO PYRITE GRAINS; VERY RARE GLAUCONITE. SOME INDIVIDUAL PIECES HAVE FAIR VISIBLE' POROSITY, BUT APPEARS VERY TIGHT OVERALL. OVERALL SHOW RATING: TRACE SHOW. LOCALLY RANGING TO POOR SHOW. LOGGING GEOLOGIST(S): CRAIG SILVA RALPH WINKELMAN EPOCH WELL LOGGING INC. SHOW REPORT NO. 2 KUPARUK SANDS INTERVAL DEPTH INTERVAL: 8140 TO 8700 (MD) TOTAL FTG: 560 AVERAGES: ROP (fph) 25 60 21 158 WOB 30 16 15 38 RPM 60 55 58 58 MUDWT 10.4 10.4 10.5 10.4 TOTAL GAS 21 95 31 208 Cl (ppm) 3074 16390 5031 36819 C2 (ppm) 81 611 220 1382 C3 (ppm) 32 325 131 687 C4 (ppm) 11 144 74 310 C5 (ppm) 4 47 22 113 VISIBLE STAINING: PERVASIVE YELLOWISH BROWN COLOR FROM STAINING SAMPLE FLUORESENCE: COLOR: YELLOW AMT: 5-10%, Loc 50% INTENSITY DOMINANTLY VERY DULL., LOCALLY DULL VISIBLE CUT: COLORLESS TO VERY PALE STRAW CUT FLUORESENCE: COLOR: YELLOW TO WHITISH YELLOW INTENSITY PALE, OCCASIONALLY IMPROVED (IN "B" SAND) TO BRIGHT QUALITY: 85% SLOW & SLOW STREAMING, 15% FAST-INSTANT & FAST STREAM VISIBLE RESIDUAL CUT: VERY PALE BROWN TO PALE BROWN DRY RING RESIDUAL CUT FLUORESENCE: COLOR: WHITISH YELLOW INTENSITY MODERATELY BRIGHT TO BRIGHT FORMATION DESCRIPTION: DIVERSE MIX OF VERY FINE TO FINE SS TYPES; MINOR AMT SS/SD RANGING TO VC-GRANULE; YELISH BROWN TO PALE BRN (FROM OIL STAINING); RDD TO SBANG; SPHERICAL TO SUBDISCOIDAL; BOTH CLAY & MTRX SUPPORT; OFTEN CALC-SIDERITE CEMENTED; TR-5% GLAUCONITE; "B" SAND VERY I~INE AND WELL SORTED AND HAS "BEST' SHOW PROPERTIES; QUARTZ ARENITE WITH MINOR LITHIC VARIATIONS; LOCALIZED HIGHLY VARIABLE POROSITY; MOST IS FAIR TO POOR; PERSISTANT LARGE VOLUME OF CLAY THROUGH THIS SAND. OVERALL SHOW RATING: TRACE TO POOR. VERY THIN POSSIBLE "GOOD" ZONES. LOGGING GEOLOGIST(S): CRAIG SILVA RALPH WINKELMAN EPOCH WELL LOGGING, INC. SHOW REPORT NO. 3 949O DEPTH INTERVAL: AND 9720 JURASSIC SANDS TO 9600 TO 9990 (MD) TOTAL FTG: 380 ROP (fph) 80 112 85 115 WOB 4 7 10 14 RPM 79 75 65 78 MUD WT 10.4 10.5 10.4 10.5 TOTAL GAS 25 60 60 77 Cl (ppm) 3232 9774 6089 12316 C2 (ppm) 106 252 247 354 C3 (ppm) 85 148 264 227 C4 (ppm) 46 61 178 87 C5 (ppm) 17 16 111 90 VISIBLE STAINING: NONE SAMPLE FLUORESENCE: COLOR: YELLOW WHEN PRESENT, COMMONLY THERE IS NONE AMT: SPOTTY INTENSITY VERY DULL TO FAINT VISIBLE CUT: USUALLY NONE, OCCASIONALLY' CUT FLUORESENCE: COLOR: YELLOWISH WHITE INTENSITY VERY DULL TO FAINT QUALITY: SLOWWITH NO STR~ VISIBLE RESIDUAL CUT: VERY FAINT PALE BROWN OR PALE STRAW RING RESIDUAL CUT FLUORESENCE: COLOR: GOLDISH-BROWNISH YELLOW TO WHITISH YELLOW INTENSITY VERY DULL, VERY PALE FORMATION DESCRIPTION: LIGHT BROWN TO LIGHT BROWNISH GRAY TO LIGHT GRAY; VERY FINE, ABUNDANTLY GRADING INTO SILT RANGE; (INCR AMT FN AFTER 9800'); DOM WELL SORTED; SBANG TO SBRD; SUBDISCOIDAL TO SPHERICAL; MIX OF BOTH GR AND MTP, X SUPPORTED; WEAK CALC AND SILIC CEMENTATION, GEN APPEARS "CLEAN" BUT BRN COLOR FROM MICRO INTERSTITIAL CLAY; UPPER SS HAS ABNT GLAUCONITE, LOWER SS ONLY TRACE; QUARTZ ARENITE TO SILTY QUARTZ ARENITE; FRIABLE TO DURABLE; MOST APPEARS TIGHT. OVERALL SHOW RATING: TRACE SHOW THAT COULD BE RATED AS A NONE SHOW LOGGING GEOLOGIST(S): CRAIG SILVA RALPH WINKELMAN EPOCH WELL LOGGING, INC. SHOW REPORT NO. 4 SAG RIVER SAND DEPTH INTERVAL: 10650 TO 10700 (MD) TOTAL FTG: 50 u ^w.A~as: I "a~°aa I I ~u"~"~ I I ^~v~" I I MAXIMUM I ROP (fph) 80 60 10 79 WOB 13 15 18 18 RPM 65 72 71 73 MUD WT 10.4 10.4 10.4 10.4 TOTAL GAS 150 820 120 1241 Cl (ppm) 16191 142765 17881 190694 C2 (ppm) 1137 11035 1785 14999 C3 (ppm) 947 7684 1888 10238 C4 (ppm) 653 4253 1732 5530 C5 (ppm) 414 2423 1408 3804 VISIBLE STAINING: PALE TO VERY LIGHT BROWN SAMPLE FLUORESENCE: COLOR: YELLOWISH WHITE TO GREENISH YELLOWISH WHITE AMT: 30-90% INTENSITY MODERATELY BRIGHT VISIBLE CUT: NONE IN PLAIN LIGHT CUT FLUORESENCE: COLOR: BLUISH WHITE TO YELLOWISH BLUISH WHITE INTENSITY BRIGHT QUALITY: INSTANT CUT, SPO]-FY SLOWLY EXPANDING STREAMING VISIBLE RESIDUAL CUT: PALE GOLDEN BROWN RESIDUAL CUT FLUORESENCE: COLOR: YELLOW INTENSITY BRIGHT TO VERY BRIGHT FORMATION DESCRIPTION: PALE BROWNISH GRAY TO PALE GRAY; VERY FINE LOWER TO VERY FINE UPPER; WELL SORTED; SBANGULAR; SUBDISCOIDAL TO SUB- SPHERICAL; GRAIN SUPPORTED WITH CALCITE CEMENTATION; ACID PRO- DUCES MODERATE TO STRONG EFFERVESCENCE; GLAUCONITIC QUARTZ ARENITE; 5-8% GLAUCONITE; GREAT VARIATION IN VISUAL POROSITY FROM GOOD TO TIGHT; TIGHTLY CEMENTED SS APPEARS TO DOMINATE. LOW RESISTIVITIES FROM LWD SUGGESTS WETNESS AND POSSIBLE DISCONTINUITY. OVERALL SHOW RATING: POOR TO LOCALLY FAIR LOGGING GEOLOGIST(S): CRAIG SILVA RALPH WINKELMAN EPOCH WELL ,LOGGING, INC. SHOW REPORT NO. 5 IVlSHAK SAND (T.D.) DEPTH INTERVAL: 10817 TO 10885 (MD) TOTAL FTG: 68 ROP (fph) 14 55 45 62 WOB 20 8 12 14 RPM 71 70 74 72 MUD WT 10.4 10.4 10.4 10.4 TOTAL GAS 67 370 105 555 Cl (ppm) 5011 52149 9171 90238 C2 (ppm) 432 2841 475 4750 C3 (ppm) 372 1686 386 2698 C4 (ppm) 298 1078 348 1654 C5 (ppm) 248 1148 355 1412 VISIBLE STAINING: PATCHY OR SPOTTY VERY LIGHT SAMPLE FLUORESENCE: COLOR: 30-40% BRIGHT YELLOW, AND 20-40% VERY DULL AMT: 50-80% INTENSITY WHITISH YELLOW VISIBLE CUT: NO VISIBLE CUT IN PLAIN LIGHT CUT FLUORESENCE: COLOR: WHITISH YELLOW TO BLUISH WHITE INTENSITY DOMINANTLY SLOW AND DULL TO VERY FAST BRIGHT QUALITY: SLOW WIDE DIFFUSE STREAMING TO TRACE FAST STREAM VISIBLE RESIDUAL CUT: NO VISIBLE DRY CUT RESIDUAL CUT FLUORESENCE: COLOR: DOMINANT DULL YELLOWISH GOLD INTENSITY RANGES TO BRIGHT YELLOW FORMATION DESCRIPTION: VERY LIGHT GRAY TO VERY PALE YELLOWISH GRAY TO WHITE; COMMON MIXED WHITE AND CLEAR (FROM WHITE CHERT AND COLORLESS QUARTZ); INITIAL FINE LOWER TO MEDIUM LOWER, THEN ERRATIC COARSENING DOWNWARD TO ABNT COARSE AND COMMON LARGER CHERT CLASTS; FRIABLE, EASILY DISAGGREGATED; CHERT- RICH SUBLITHIC TO LITHIC ARENITE; NON- CALC CEMENTATION; COM SECONDARY SILIC XLN OVERGROWTHS ON QTZ AND CHERT; COM GRS XLN PYRITE; AND PYRITE SEC GROWTH; GOOD POROSITY. OVERALL SHOW RATING: POOR TO LOCALLY FAIR; LWD INDICATES FORMATION IS WET LOGGING GEOLOGIST(S): CRAIG SILVA RALPH WINKELMAN REPORT ~tat- cf Alaska 01L a ~A~ C~SE~rATZON C0~SSIO~ ..:==.---r~n-L'~- c -~: !e: ..Pi !.To. Wei! .N'a_~e ~ .%eview ~e well file, a:d' ca:~-:: c~m pluq~i~q, well 7 Cc:de ~ Da~e · · Well Sample Transmittal To' Sample Contact No, State of Alaska Attn: Howard Okland 3001 Porcupine Drive Anchorage, AK 99502 (907)-279-1433 Office (907)-793-1235 Desk (907)-276-7542 Fax C #12 West Gwydyr No.1 From: Steve Carroll Sperry-Sun Drilling Services 5631 Silverado Way Suite G Anchorage, AK 99518 907-273-3538 DID Office 907-273-3535 or 3550 Fax COntents: I -4X7 Washed Control Dried From: Bi= Exploration (Alaska)Inc. West Gwydyr No.1 North Slope, Alaska APl # 50-029-22954-00 Shipment Includes: Process Depth Start ~070/~q/d0 Process Depth End Process Date Start ~-/~--0o Process Date End Total Number of Samples Included in this shipment Total Number of Sample Intervals missing in this shipment Shipment Number Comments: '~d ~ WB # Sample Contact GW1 No.12.doc 2/13/2000 SLC 5631 Silverado Way, Suite G, Anchorage Alaska 99518-1654 · (907)-273-3500 · Fax (907)-273-3535 A Halliburton Company DRI LLI Itl 13 ~iE RV/I I::: E =; Well Sample Transmittal To: From: Sample Contact No. State of Alaska Attn: Howard Okland 3001 Porcupine Drive Anchorage, AK 99502 (907)-279-1433 Office (907)-793-1235 Desk (907)-276-7542 Fax Steve Carroll Sperry-Sun Drilling Services 5631 Silverado Way Suite G Anchorage, AK 99518 907-273-3538 DID Office 907-273-3535 or 3550 Fax C #12 West Gwydyr No.1 WG/ COntents: 1 -4X7.Washed Control Dried From: BP Exploration (Alaska)Inc. West Gwydyr No.1 North Slope, Alaska APl # 50-029-22954-00 Shipment Includes: Process Depth Start 5'7'7o/5%°Zo Process Depth End Process Date Start '3'-7- <:3© Process Date End Total Number of Samples Included in this shipment Total Number of Sample Intervals missing in this shipment Shipment Number ~ WB # Comments' ~ <a / .,~"/,,/*~'~,,~ v' ,~/_ .~ Sample Contact GW1 No.12.doc 2/13/2000 SLC 5631 Silverado Way, Suite G, Anchorage Alaska 99518-1654 · (907)-273-3500 · Fax (907)-273-3535 A Halliburton Company n Well Sample Transmittal To: From: Sample Contact No, State of Alaska Attn: Howard Okland 3001 Porcupine Drive Anchorage, AK 99502 (907)-279-1433 Office (907)-793-1235 Desk (907)-276-7542 Fax Steve Carroll Sperry-Sun Drilling Services 5631 Silverado Way Suite G Anchorage, AK 99518 907-273-3538 DID Office 907-273-3535 or 3550 Fax C #12 West Gwydyr No.1 WG1 Contents: 1 -4X7 Washed Control Dried From' Shipment Includes: Process Depth Start Process Date Start ~--- BP Exploration (Alaska)Inc. West Gwydyr No.1 North Slope, Alaska APl # 50-029-22954-00 Total Number of Samples Included in this shipment Total Number of Sample Intervals missing in this shipment Shipment Number ~ WB # COmments: ~O / ~"-,,~,/*?~,~ ~',,~/__. 5 Process Depth Process Date End Sample Contact GW1 No.12.doc 2/13/2000 SLC 5631 Silverado Way, Suite G, Anchorage Alaska 99518-1654 · (907)-273-3500 · Fax (907)-273-3535 A Halliburton Company [Fwd: West Gwyder Bay #1 P-n-Al Subject: [Fwd: West Gwyder Bay #1 P-n-A] Date: Tue, 22 Feb 2000 11:50:26 -0900 From: John Crisp <john_crisp~admin.state.ak.us> Internal Organization: State of Alaska, Dept of Admin, AOGCC To: Blair E Wondzell <blair_wondzell~admin. state.ak.us> CC: Tom Maunder <tom_maunder~admin. state.ak.us> Subject: West Gwyder Bay #1 P-n-A Date: Tue, 22 Feb 2000 10:51:09 -0500 From: "Jones, Theodore M (FAIR)" <JonesTM2~BP.com> To: "'john_crisp~admin. state.ak.us'" <john_crisp~admin.state.ak.us> <<Mvc-001f.jpg>> <<Mvc-016f.jpg>> <<Mvc-023f.jp~>> <<Mvc-024f.jp~>> John here are some of the pictures from Gwyder, thanks for your help. Ted ['~MVC-001F./PG I Type:/PEG Image (image/jpeg) IEncoding: base64 ~MVC-023F.JPG Type: JPEG Image (image/jpeg)] Encoding: base64 Name: MVC-023F.JPG Type: JPEG Image (image/jpeg)] [~MVC-024F.JPG] Type: JPEG Image (image/jpeg) 1 ofl 3/13/00 12:58 PM MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission Robert Christenson(,~~~('~ DATE: February 21, 2000 Chairman THRU: Blair Wondzell,/~~ P. I. Supervisor FROM: John Crisp, SUBJECT: Petroleum Inspector Plug & Abandonment West Gwyder #1 BPX Exploratory Well PTD 199-121 February 21, 2000: I traveled to BPX's West Gwyder #1 Exploratory well to witness final plug & abandon work on this well. I witnessed the removal of well head equipment from this well. Hard cement was observed between the conductor & surface casing. A solid cement plug was observed inside the surface casing 5' from tundra level. Conductor & surface casing was cut approximately 3' below tundra level. A plate with all pertinent well data bead welded to it was welded to the conductor casing 3' below tundra level. SUMMARY: I witnessed the P & A of BPX's West Gwyder #1 Exploratory Well. P & A of West Gwyder #1 conformed to AOGCC regulations. Attachments: P & A West Gwyder #1 2-21-00jc cc; CONFIDENTIAL P & A West Gwyder .doc Operator: Operator Rep.: Lease No.: Drive Pipe: Conductor: Intermediate: 1. Open Hole Plugs: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Plug And Abandonment Report BP Exploration ( Alaska ) Inc. John Rail Well No.: WG #1 Sec. T-R Total Depth: 11,030' M Date: 2/21/00 Well Name: West Gwyder #1 PTD No.: 199-121 12N - 12E Meridian: UM Elevation: 53.5 Mud Wt.: 10.6 ppg. CASING DATA: 20" O.D." Set 6: ft. With Penetration O.D." Set 6: 80' ft. Surface: 10 3/4" O.D." Set 6: 3533' O.D." Set 6: ft. Prodctn: O.D." Set 6: PLUGGING DATA: 15.8 ppg. Cement f/11030' to 10450'. Calculated cement 200' above the top of all hydrocarbon-bearing strata. 2. Open Hole Isolation Plugs: 3. Perforation Plugs: Retainer set 90' from surface casing shoe. 15.8 cement 109' below surface casing shoe. Cement 52' above retainer. Tested retainer to 3000psi. 4. Annulus Plugs: 5. Casing Stub Plugs: 6. Surface Plug: 15.7 ArcticSet 1 cement f/3' below tundra level to 185' md. Casing Removal: " Casing Cut @ Feet 20 .... Casing Cut @ -3 TL Feet 10 3/4 .... Casing Cut @ -3 TL Feet " Casing Cut @ Feet REMARKS: AOGCC inspector witnessed setting & cementing surface casing segregation plug. Witnessed testing of segregation plug to 3000 psi. for 30 minutes. Witnessed cement between 20" conductor & 10 3/4" surface casing. Witnessed solid cement plug 5' below tundra level inside 10 3/4" surface casing. Witnessed pertinent data bead welded to plate that was welded to 20 conductor casing. All casing strings cut approximately 3' below tundra level. Distribution: odg - Well File c - Operator c - DNR/DOG c - Database c - Rpt File c - Inspect~Ei.000 (Rev. 3/93) Inspector (s): P & A West Gwyder .xls JPEG im~,ge 640x480 pixels 1 of 1 2/23/00 7:35 AM JPEG image 640x480 pixels .... ~;:..::;',:.".':'..-..:. :. ':'.',..' ..t'.;".'-" .'"' ". .......... . ;!::,.~ .:... .- :... ,, · ,. ..... · "',.% ..~.;4 .'; :,,-, · ,,,, · ' i:': ' :, .',. · :::." :... , .~..;.. ·" = :i ;'~ ,,,i~ , :, ,F '" ..'.,..' ' .. ~.. .'...!:":'! i".' "'..' · "!:.:. :..:.!.,'.'..,,i ·':''''': :''?'!'' '. .... ':' ~ :.'~.' il~' 'i .' ~ '" ..... ': .~. =' "~.~r~', . '...'.. .. ,, ,, .,, ,, · · , ,, , · · :;~ ~i::..'!' ...' '~:~ ~ '..... '.. ~,,, ..:!' , · '~;::::' ' .: ~':. ·'.:'";i'. ...:. ..... · .... ~;~':::..": '; .....::: · · . .',~:i::,~ ..... : '' · · ', :' · ~ .. :.17':=. :.".: .. · ' : · .' ?: .. '. · ' ' ' .': "i .'".;" .! ';: :: . ..;;.'i:' · · ' .. · ;:.' · ~J;','i:' 2... .... ;',':;'.:.:,'.~.!'.' . '.. :... . ....,,. .. 1 of 1 2/23/00 7:35 AM JPEG imsge 640x480 pixels 1 of 1' 2/23/00 7:35 AM JPEG imcge 640x480 pixels 1 of 1 2/23/00 7:35 AM MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission Robert Christenson,~~0 DATE: February 17, 2000 Chairman THRU' Blair Wondzell, P. I. Supervisor FROM' John Crisp, ~/~~~ SUBJECT: Petroleum Inspector Surface Casing Shoe Plug West Gwyder # 1 BPX Exploratory Well PTD 199-121 February 17, 2000' I traveled to BPX's West Gwyder #1 Exploratory well to witness the placement of the cement retainer & the cementing of the uncased to cased portions of the wellbore on West Gwyder #1 Exploratory well. I witnessed the HOWCO EZSV cement retainer set 90' from the surface casing shoe. I witnessed cementing thru the retainer, a volume of cement that would extend from the cmt. retainer to 109' below the surface casing shoe. A calculated volume of cement was placed on top of retainer to 52' above retainer. The surface casing & cement retainer were then tested to 3000 psi. for 30 minutes. SUMMARY: I witnessed the RIH & setting of the cement retainer effectively segregating uncased & cased portions of the wellbore on West Gwyder #1. I witnessed the volumes of cement pumped & the placement of cement for this segregation plug. Tested segregation plug to 3000 psi. for 30 minutes. Attachments- none cc; CONFIDENTIAL Csg. Shoe Cmt STATE OF ALASKA -' ALASK~ OIL AND GAS CONSERVATION C~JMMISSION APPLICATION FOR SUNDRY APPROVAL Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 (Not Final) (Not Final) Plugs (measured) Junk (measured) 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service Datum Elevation (DF or KB) Plan RKB = 53.5' 7. Unit or Property Name Exploration 8. Well Number West Gwydyr #1 9. Permit Number 199-121 10. APl Number 50- 029-22954-00 11. Field and Pool Prudhoe Bay Field / Undefined Pool 4. Location of well at surface 3509' NSL, 5066' WEL, SEC. 04, T12N, R12E, UM At top of productive interval N/A At effective depth 109' NSL, 4206' WEL, SEC. 33, T13N, R12E, UM At total depth 109' NSL, 4206' WEL, SEC. 33, T13N, R12E, UM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 11030 feet 10513 feet 11030 feet 10513 feet Size 20" 10-3/4" Cemented 260 sx Arctic Set (Approx.) 745 sx Permafrost, 279 sx Class 'G' MD TVD 80' 80' 3533' 3533' Casing Length 80' 3504' 4-1/2", 12.6#, L-80 to 2197' Structural Conductor Surface Intermediate Production Liner Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) None' 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 14. Estimated date for commencing operation February 16, 2000 Date 16. If proposal was verbally approved Tom Maunder/~¢~ ?/~,~"O%16/2000 Name of approver Date approved Contact Engineer Name/Number: J. Allen Sherritt, 564-4809 [Approval N o ;.l..,~'(.~.).--- Submit In Triplicate 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ Dan Stone ,"~*~D~ ~"'~'"~. Title Senior Drilling Engineer Commission Use Only Conditions of Approval: Notify Commission so representative may witness Plug integrity ;~, BOP Test__ Location clearance Mechanical Integrity Test Subsequent form requ~rcj~- ~C..~ ORIGINAL SIGNED BY ;~,99¢~¢.e% 0 ~/~ Approved by order of the Commission Robert N. Christerlson f~ / uommissioner Form 10-403 Rev. 06/15/88 FEB-16-00 [4ED 04:01 PR AO0..C~_. FaX NO, 90~_..276 7842 P, 03 ~ t~:~z ~,'AX 907 5193 BP----~....,,~,,,~ CONFII]ENTItIL ~o%~~,~ ~,'~ c,-~ ~.,~-~ ~,~. '~0_'7~ ~, ' ' West Gwydyr #1 P&A Procedure February 15, 2000 .Objective of plUqs #1 Is to i_solate hydroca[bon_ bearing zones from rest of welibore. 1. GIH to TD with open-ended drill pipe. Circulate and condition mud for cementing operations. ' No~s: Incorporate any available logging temperatures into slurry designs, Temperatures in this procedure are estimated via offsets. Refer to Recommended Practice - "Setting a KO or Abandonment Plug In Open Hole" Mix and pump cement. Spot 15.8 ppg cement from TD=11,030' MD to 10,450' MD Dlsptace with 10.6 ppg mud. RECE VED Preflush: Fresh Water Spacer:. Drilling Mud SlurrY; 290 sacl~ of G + .2% D46 Antifoam + .2% D6Ei Dispersant + ,52% DaO0 Retard~J~lOr~ DenSity = IS.'8PPg, Mix Water ~ 5.09 gat/~k, Thick Time = 2:34.to 74 BC (est 220°F.~bbt) FEB 1 6 2.000 Alaska 0il & ~as ~rt~, 0'~.i~ 3, POH and PU EZSV for 10 %" 45,5# casing, LD drill pipe as necessary, GIH and set EZSV @ 3,654' MD, (100' above casing shoe,) Set down 20K on EZSV to verify placement and integrity. Sting in and establish iniection rate. PU above EZSV. Oblective of 01up ~ is to Isolate, caused section of wellbore from uncased wellbore, 4. Plug #2 - volume to cover 100' below _casing shoe and 50' on top of EZSV: · Mix and pump cement, Sting into EZSV and inject 20.0 bbls cmt below Puli out of EZSV and dump 4.8 bbls cra! on top of EZSV · PU above TOC and circulate to clean up drill pipe. Leave 10.6 ppg mud in casing. PreflUsh: Fresh Water Spacer. Drilling Mud. Slurry: 120 Sacks of G + ,2% D46 Antifoarn + ,5% S1 Accelerator Density 'l S. S ppg, Mix Water -- 5.]2 gal/sic. Thick Time -' 4:30 to 74 B C (est 85'°F sbA/) 5. Test casing to 3000 psi. 6. POH to' 1 t~'MD, (-155' below ground level), LD drill pipe as necessary. FEBT18-O0 NED 04102 PM ~O~rr~ .......... t~:~Z t"AX 907 FPiX NO, 90Z.276 7542 P, 04 III BP EXPI.OFbt'rj. Oh' -~ AO(~CC ~ o o,'3 --Objective ofj31uo ~3 is_to, isolate surface from wellbore. CONFIO 'TIAI. 7. Plug #3 ~ volume to set 150' plug with top 5' BGL (:I:35'MD RKB), (,,,185' MD to 35' MD): Preflush: Mix and pump cement, .Spot I5.0 ppg cement from 185' MD to 35' MD PU above TOC and circulate to clean up drill pipe. Leave water in casing, FroshWator RECEIVED Slurry: 90 sack,~ of ArcticSet 1 Density - JS.7 p£g, Mix Water = 3.56 gal/sk, 1hick Time = 2:30 8. RD, inspect location, and move out rig. FEB 16 2000 Alaska Oit-& Gas ~ons, Once the rig has left location, Tool Services will cut and pull the 20" conductor and 10 sA" surface casing. A steel plate, With the appropria[e well information, will be welded to the conductor and the cellar will be back filled, (in accordance with: AOGCC 20 AAC 25.120). . ' ' g g' Senior Drilling Engineer/date d.,,~-('l'ony Bunch t t,, Drilling Superintendent/date 13-1/2" Hole size 10-3/4" 45.5# L-80 BTC Casing 3,533' MD West Gwydyr #1 PROPOSED P&A DESIGN CONFIBENTIAL 35' MD to 185' MD Surface- 15.7 ppg ArcticSet I CBt. ?~'.:-..?...i, 30 bbl Pill ~ ~ 10-3/4" TAM Port Collar @ 1000' MD. iiii:::?!iii!iI 10.6ppgMud Ii?iii , ?.::.~,.~?~;,.::;:';~::~;::..::.:~:~;:,,.:?~....i:~.:~::.,~:,..;:.~~ 3,383 MD- 15.8 ppg Class G Cement . 3,433 MD - EZSV i 3,433'MD to 3633' MD - 15.8 ppg Class G Cement No abnormally pressured formations encountered while drilling. 9-7/8" Hole Size 10.6 ppg Mud 7890' MD - Top of Kuparuk 8713' MD - Base of Kuparuk No Significant hydrocarbons present. . Miluveach shale 9491' MD - Top of Jurassic 9531' MD - Base of Jurassic No Significant hydrocarbons ~ Kingak shale 10,650' MD - Top of Sag River- Hydrocarbons present 10,700' MD - Top of Shublik- No Hydrocarbons 10,817' MD - Top of Ivishak- Hydrocarbons present 11,030' MD / 10,513' TVD - TD of 9 7/8" Hole Date Revised by Comments _ 2/16/00 JAS Exploration/Appraisal WELL: W. Gwydyr #1 APl #: 50-029-22954-00 MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission Robert Christenson?~I~ DATE: February 2, 2000 Chairman THRU: Blair Wondzell P. I. Supervisor FROM: Lou Grimaldi, ~-, ¢-~ SUBJECT: Petroleum Inspector Leak Off Test BPX West Gwydr #1 Prudhoe Bay Field PTD #199-121 CONFIDENTIAL Tuesday, February 1, 2000; I witnessed the Leak Off Test at the Surface casing shoe on BPX exploratory well West Gwydr #1 in the Prudhoe Bay Field. The casing was tested to 3000 psi and after a small initial decline held steady for thirty minutes. The Wiper plug and float collar were drilled as was the cement to the shoe and twenty feet of new hole. I observed returns and saw a indication of clay and shale coming across the shakers. The hole was circulated clean with a 10.0 mud weight constant going in and coming out of the hole. The leak off test was started and the drillpipe pressure raised slowly to 1200 psi @ 6 strokes per minute (approx. 15 p.p.g. EMW) where I noticed a decline of the rate of pressure increase per stroke. The pumps were run a total of a 40 strokes to a pressure of 1260 psi. The last six strokes were obviously pumping away to the fractured formation. The pumps were shut down with twenty psi lost in the first ten seconds. The pressure was watched for ten minutes with less then a ten- psi decline stabilized at the end. A calculated E.M.W. of 16.5 p.p.g, was arrived at. SUMMARY: I witnessed a Leak Off Test of the Surface casing shoe on BPX well Gwydr #1 in the Prudhoe Bay Field. Attachments: L.O.T. West Gwydr #1 2-1-00 LG.XLS CC; Prudhoe Bay Drilling CONFIDENTIAL L.O.T.html AOGCC Confidential Cover Sheet Page 1 LEAK OFF TEST Well Name West Gwyder #1 Permit to Drill # 199-121 Date 2/1100 Operator BP Exploration Field/Unit Prudhoe Bay Field Company Representative Tom Anglen Ri_q Nabors 7ES A.O.G.C.C. Inspector GrimaldilCrisp LEAK OFF DATA Mud Weight in hole (P.P.G.)I 10.001 Surface Hole T.D. 3548 S.G. of Mud in hole 1.20 Drill Out MD 3568 Gradient of Mud in hole 0.519 Drill Out TVD 3568 Surface pressure at break 1210 Hydrostatic Head of Mud at T.D. 1852 Surface pressure taken to 1265 B.H.P. at T.D. (with Leak Off pressure applied) 3062 Surface pressure bled to (10 seconds) 1225 Equivalent Mud Gradient 0.86 Surface pressure bled to (1 minute) 815 Equivalent Mud Specific Gravity 1.98 Surface pressure (Stabilized) 720 Equivalent Mud Wei,.qht at Break (P.P.G.) 16.53 COMMENTS Is this a repeat test No Anticipated maxBHP at T.D. for upcoming casing section 5362 If Yes what was last tests EMW ? T.V.D. at Total Depth 10970 Volume of fluid pumped during L.O.T. 3 Bbl's M.W. needed to balance wells max pressure 9.40 Volume of fluid returned after bleed-off 1 Bbl Mud Weight called for in program 10.8 L.o.t Page 1 of 3 Updated by L.G. 8/4/98 2/11/00 AOGCC Confidential L.O.T. #1(Data) Leak Off Test Strokes Casing test Leak Off test Delta PSI Shut-in Max L.O.V. 1400 ~ : 0 0 0 0 0 1350 ~ . 2 100 50 20 50 ; 4 200 70 20 100 1250 ~ ' ' , 6 305 90 40 150 : ' / I /~ / 8 410 130 45 200 1200 {:.. -- - -- / ! i' = / [ - 10 515 175 55 253 1150 i ! t ~ _ 12 615 230 70 305 11004 : / i ; ~ / 14 720 300 90 358 lO5O -:= ' ~ i 16 820 390 110 410 c lOOO ~ ; / / ~I 18 925 500 90 463 a 950 ~,! '/ 20 1025 590 100 515 s 900 ~ / tt 1 i 850 ~ -- ! 22 1125 690 90 565 n / i ,., / ' . 24 1230 780 90 615 g 8ooi / ,/ 26 1330 870 90 668 750 ~ / / / . 28 960 80 720 P 7oo~ / / ,,/ i . 30 1040 85 770 r 6501 / / ,/ 32 1125 85 820 e 600i __ 34 1210 30 s 550 i /= / '/ : Casingtest 36 1240 -15 s i , ~// I Leak Off test/ u 500~ /! ! /, -- I Shut-in 38 1225 35 r 450~ 40/: 10 1260 1240; ! , ~' Max L.O.V. e 400 i / //' 1 815 350 i/' -- 2 790 / / 3 775 300I / / / 4 765 250~ / / , ! . 5 755 200i / / / 6 745 150 ~ 8: 730 5O 9 720 0 10 715 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 I 2 3 4 5 6 7 $ 9 10 Strokes/Minutes Max Equiv Mud Weight= 12.8 Present Mud Weight= 10 I Difference= 2.8 TVD of shoe: 3568 Max Surface Pressure= 520 PSI L.o.t Updated by L.G. 8/4/98 Page 2 of 3 2/11/00 1400 1200 1000 80O 600 4OO 20O Test B - Stop Pump & Close Valve ~ C - 10 Second Shut-in Pressure ( D - End Of Test // /// :'"'x--> :'""x'""!/~x,.__x __o__ Casing te /// ~ --Leak 0tt' Maximum Volume Line For L.O.T. / ;~ i'--x--Shut-in --43-- Max L.O 0 1 2 3 4 5 6 7 8 9 10I SHUT-IN TIME IN MINUTES (Ibr -x-) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 i 2 3 4 5 6 7 8 9 10 Strokes/Minutes Updated by L.G. 8~4~98 L.o.t 2/11/00 MEMORANDUM State Of AI as ka Alaska Oil and Gas Conservation Commission TO: Robert Christenson; DATE: February 1, 2000 Chairman THRU: Blair Wondzell, ~~~ P. I. Supervisor ~~(o a FROM: Lou Grimaldi{' SUBJECT: ROPE Test, Nabors 7ES Petroleum In~ ector BPX West Gwydr #1 P Prudhoe Bay Field Tuesday, February 1, 2000: I witnessed the initial BOPE test on Nabors rig #7ES which was drilling BPX exploratory well West Gwydr #1 in the Prudhoe Bay Field. The rig was ready to test when I arrived. All BOPE equipment was tested with No failures observed. The crew performed well during the testing of the BOP's. The rig as well as the location was clean and seemed well maintained. Charlie Henley (Tuna) and Cleve Coyne run a good operation. A very good test, hands knew what they were doing. SUMMARY: I witnessed the initial test of the BOPE on Nabors rig #7ES drilling. BPX exploratory well West Gwydr #1 in the Prudhoe Bay Field. There were no failures observed. Test time 2 hours. Attachments: BOP Nabors 7ES 2-1-00 LG.XLS CC: (Prudhoe Bay drilling) NON-CONFIDENTIAL BOP Nabors 7ES 2-1-00 LG Nabors 7ES STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover. DATE: 2/1/00 Drlg Contractor. Nabors Rig No. 7ES PTD # 199-121 Rig Ph.# 659-4831 Operator. BP Exploration Rep.: John Rall Well Name: West Gwyder#1 Rig Rep.: Charles Henley/Cleve Coyne Casing Size: Set @ Location: Sec. 4 T. 12N R. 12E Umiat Test:lnitial X Weekly Other TEST DATA Test MISC. INSPECTIONS: FLOOR SAFETY VALVES: Quan. Pressure P/F Location Gen.: P Well Sign P Upper Kelly / !BOP 1 250/5,000 P Housekeeping: P (Gen) Dri. Rig P Lower Kelly / !BOP 1 250/5,000 P PTD On Location P Hazard Sec. P Ball Type 1 250!5,000 P Standing Order Posted P ~- Inside BOP 1 Functioned P BOP STACK: Quan. Test Press. P/F Test Annular Preventer 1 250/3000 P CHOKE MANIFOLD: Pressure P/F Pipe Rams 1 250/5,000 P No. Valves 14 250/5,000 P Lower Pipe Rams 1 250/5,000 P No. Flanges 32 250/5,000 P Blind Rams 1 250/5,000 P Manual Chokes 1 Functioned P Choke Ln. Valves 2 250/5,000 P Hydraulic Chokes 1 and Tested P HCR Valves 1 250/5,000 P Kill Line Valves 5 250/5,000 P ACCUMULATOR SYSTEM: Check Valve 250/5,000 N/A System Pressure 2,875 P Pressure After Closure 1,600 P MUD SYSTEM: Visual Alarm 200 psi Attained After Closure min's 40 sec. Trip Tank P P System Pressure Attained 2 min's 39 sec. Pit Level Indicators P P Blind Switch Covers: Master: P Remote: P Flow Indicator P P Nitgn. Btl's: 4@2000, 1 @2500, 1@3000 Meth Gas Detector P" P* H2S Gas Detector P" P` ` TEST RESULTS Number of Failures: 0 ,Test Time 2.0 ours. Number of valves tested 26 Repair or replacement of Failed Equipment will be made within N/A otify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: ~ Good Test. Distribution: orig-Well File c - Oper./Rig c -Database c -Trip Rpt File c -Inspector STATE WITNESS REOUI YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Lou Grimaldi Nabors 7ES Revised 3/30/99 by L.G. BOP Nabors 7ES 2-1-00 LG 2/4/00 MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission Robert Christenson,~ DATE' January 27, 2000 Chairman THRU: Blair Wondzell, P. I. Supervisor FROM: John Crisp?/,)~~ ¢__ SUBJECT: Petroleum I/4spector Diverter Function Test Nabors 7ES West Gwyder #1 Exp. BPX PTD 199121 January 277 2000' I traveled to BPX West Gwyder #1 Exploratory to witness the Diverter Function Test on Nabors 7ES. I witnessed the Diverter valve open before the Diverter Bag fully closed. I witnessed the accumulator test & checked the pressure on the nitrogen emergency closing system. The Rig & location were very neat & clean as has always been the case on my inspections of Nabors 7ES. Rig Rep. Mr. Charlie Henley was a pleasure to work with. SUMMARY: Function tested Diverter System on Nabors 7ES. Attachments' Div. lnsp. Nabors 7ES 1-27-00jc cc; NON-CONFIDENTIAL Div. Insp.Nabors 7ES 1-27-00jc .... ~ STATE OF A .L~SKA AI_~Si~ OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report Date: Operation: Development Exploratory: Drlg Contractor: Nabors Alaska Rig No. 7 ES PTD # 1 991 21 Rig Ph. # Operator: BPX Oper. Rep.: John Rail Well Name: West Gwyder #1 Rig Rep.: Charlie Henley Location: Sec. 4 T. 12N R. 1 2E Merdian UM 1/27/O0 X 659-4144 MISC. INSPECTIONS: Location Gen.: OK Well Sign: OK Housekeeping: OK (Gen,) Drlg. Rig: OK Reserve Pit: N/A Flare Pit: N/A 21 1/4 YES in. ACCUMULATOR SYSTEM: Systems Pressure: 2900 psig Pressure After Closure: 1 700 psig 200 psi Attained After Closure: min. 20 sec. Systems Pressure Attained: 2 min. 1 7 sec. Nitrogen Bottles: 6 btls. @ 2400 psi. ave. psig DIVERTER SYSTEM INSPECTION: Diverter Size: Divert Valve{s) Full Opening: Valve(s) Auto & Simultan TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COM~IlSSION Dan Stone Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box196612 Anchorage, AK 99519-6612 Exploratory West Gwydyr ~1 BP Exploration (Alaska), Inc. Permit No: 199-121 Sur. Loc. 3509'NSL, 5066'WEL, SEC. 04, T12N, R12E, UM Btmhole Loc. 929'NSL, 4917'WEL, SEC. 32, T13N, R12E, UM Dear Mr. Stone: 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Enclosed is the approved application for permit to drill the above referenced ;vell. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Robert N. Christenson, P.E. Chair BY ORDER OF THE~OMMISSION DATED this , !~ day of January, 2000 dlf/Enclosures cc: Depamnent of Fish & Game, Habitat Section xv/o encl. Department of Environmental Conservation u'/o encl. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Steve Davies A.O.G.C.C. From: Dean Chergotis & James C. Seccombe BP Exploration Alaska Subject: West Gwydyr 01 January 04, 2000 Steve, RECEIVED JAH 07 2.000 Alaska Oil a Gas Cons. Commissior Anchorage As per our phone conversation on January 04, 2000, this letter is to document the status of our shallow drilling hazard analysis for the proposed West Gwydyr 01 well scheduled to spud this month. We would like to reiterate that it is always BP Exploration Alaska's intent to conduct our operations in a safe and environmentally responsible manner. What follows are the major points covered in our conversation: Proximal offset well data shows no indication of over-pressured strata or shallow permafrost hydrate issues. The primary offset wells utilized were the Gwydyr Bay State Unit No. 01 and the Plaghm Beechy Point No. 01 as they are within the same major fault block as and straddle the proposed Wgwydyr-O1 location. Mud and Wireline logging information was utilized in this analysis. Stacking velocities from the 1995 Fullsail 3D data processing sequence show no indication of either velocity regression due to over-pressured strata or shallow hydrate (trapped gas). This velocity data is analyzed primarily for imaging and is probably unreliable for shallow, permafrost analysis. The analysis of both offset well and 3D seismic data show no indication of hazards, but are not definitive. Therefore, BP Exploration will work on the assumption that the possibility of encountering drilling hazards exist and establish processes to mitigate the associated risks. We will ensure that all personnel associated with the West Gwydyr 01 operations, both in Anchorage and at the rig site, will be aware of the possibility of encountering drilling hazards as per the above. Please contact either Jim Seccombe (907-564-4814) or Dean Chergotis (907-564-5131) if there are any further issues. Thank You, ~ja~ C~ S~cc mbe /'. IL. _~~hare. d ~ ~e r.v!ces · /~'-~ .~ '~lr~ll~ng AlasKa ~ To: Steve Davies / AOGCC From: Scott Kolstad ~/~ Date: 1/6/00 RE: W. Gwydyr 01 Permit Revision Attached is the revised permit application for W. Gwydyr 01. I have made the changes you requested regarding the potential for encountering shallow gas and gas hydrates in the surface hole, shallow gas in the intermediate hole, and the possibility of swabbing in gas while tripping. These operating practices are covered in detail in the BP Well Control manual, and the potential risks on this well will be communicated to the rig sight personnel. Please contact me with any further concerns at 564-5347. RECEIVED JA~.f 07 2000 Alas~ Oil & Gas Cons. Commission Anchorage I Well Name: J West Gwydyr #1 Weft Plan Summary Type of Well (producer or injector): I Exploration/Appraisal Producer Surface Location: 3509' FSL, 5066' FEL, T12N, R12E, S4 * As staked X = 607366, Y - 6005938 Target Location: #1 4204' FSL, 4754' FEL, T12N, R12E, S4 X = 607666 Y = 6006637 Target Location: #2 4899' FSL, 4443' FEL, T12N, R12E, S4 X = 607965 Y = 6007337 Target Location: #3 299' FSL, 5200' FEL, T13N, R12E, S32 X = 608258 Y = 6008021 Bottom Hole Location: 929' FSL, 4917' FEL, T13N, R12E, S32 X = 608530 Y = 6008655 I AFE Number: 1685105 I Estimated Start Date: I 1/10/00 I Rig: I Nabors 7 ES I Operating days to complete: I MD: 111927' I ITvD: 11097°'ss I IRKB/Surface Elevation (a.m.s.I) ~53.5'/23.5' 131 Well Design (conventional, slimhole, etc.): IConventional slimhole "Slant" Shaped well. Deep kick-off in the West Sak formation maintaining 35° deg tangent angle to TD in the base of Ivishak. Objective: Evaluate the well-bore for hydrocarbon presence and characteristics of the Kuparuk, Jurassic, Sag River and Ivishak reservoirs. Determine reservoir volume and demonstrate economic production rates with test program. Formation Markers Formation Tops MD TVD (SS) Slimhole Design Base Permafrost 1854 1800 Based on offset West Kup. & NWE State #1 3754 3700 Surface casing point in shale, 10-3/4" 45.5# L-80 Surface casing below the hydrate zone in the SV1 and above the potential hydrocarbon zone - Ugnu. K-15 (Ugnu) 3974 3920 Pore Pressure estimated at 9.8-10.0 ppg EMW K-13 (West Sak / 5169 5115 Pore Pressure estimated at 8.7 ppg Schrader) EMW 6350 6297 Begin Build 4°/100 7225 7118 End Build - Tangent 35.0°; Azi. - 24.0° HRZ 7580 7409 Kalubik 7723 7526 Kuparuk 8100 7835 Top of Kuparuk reservoir Kuparuk C1 8112 7855 Primary Target - Pore pressure estimated at 9.4 to 10.0 ppg EMW. An MDT and SWC will be performed in this interval. Miluveach 8625 8265 Jurassic 9427 8922 Secondary Target - Pore pressure estimated at 9.4 to 10.0 ppg EMW. Kingak 9622 9082 10875 10108 Intermediate Casing Point. 7-5/8" 29.7# L-80 will set in the base of the Kingak, above the top Sag River.. Sag River 10875 10108 Third Target - Pore pressure estimated at 9.3 to 9.4 ppg EMW. Sh ublik 10964 10181 Ivishak 11102 10294 Pore pressure estimated at 9.3 to 9.4 ppg EMW. TD 11927 10970 Production Liner, 4-1/2" 12.6# L-80 in the base of Ivishak formation. Casinc /Tubinc_ Pro.c_ ram: Slimhole Design Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVDss MD/TVDss 30" 20" 91.5# H40 WELD 80' surface 80'/80' 13-1/2" 10-3/4" 45.5# L-80 BTC 3754' surface 3754'/3700' 9-7/8" 7-5/8" 29.7# L-80 BTCM 10875' surface 10875'/10108' 6-3/4" 4-1/2" 12.6# L-80 I BT-Mod 3302' 8625'/8265' 11927'/10970' Tubing 3-1/2" 9.3# L-80 8RD EUE 8000' surface 8000'/7752' General Mud Program: Slimhole w/4 Liner Surface Mud Properties: Extended Bentonite I 13-1/2" hole section Spud Mud I Density Funnel Yield 10 sec 10 min pH APl (PPG) Viscosity Point gel gel Filtrate 8.6 300+ 40 20 30 9 NC to to to to to 10.0 100 65 30 40 10 Intermediate Mud Properties: 6% KCI fluid 9-7/8" hole section Density Viscosity Yield 10 sec 10 min APl HTHP (PPG) Point gel gel Filtrate Filtrate Initial 10 40 8 4 15 <6 <10 by HRZ Final 10.4 55 20 10 25 <6 <10 Production Mud Properties: 3%KCI fluid 6 ~A" hole section Density Funnel Yield 10 sec 10 min pH APl HTHP (PPG) Viscosity Point gel gel Filtrate Filtrate 9.8 40-55 15-20 4-10 12-20 8.5-9.5 <6.0 <10.0 Directional KOP: +_6350' MD - 4°/100' build Maximum Hole Angle: _+35.0° - Slant Well Close Approach Well: None Cement: Slimhole w/4 Liner First Stage Second Stage Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 10-3/4" surface Permafrost Lead: Permafrost Lead: Two Stage Job: 148/10.7/4.44 839/10.7/4.44 First stage calculated as Class "G" tail 500' TVD from TD (3254' md) with 50% Class "G" tail: excess. Lead Arcticset from 3254' md to 273/15.8/1.16 ES cementer 2054' md @ 50% excess. Second stage calculated as Arcticset 10.7 ppg Permafrost lead from 2054' to surface @ 350% excess. Lead ** Tail Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 7-5/8" Silicate Slurry: Class "G" tail: Class "G" Tail, Top 1000' above Kuparuk, Intermediate 279/11.5/2.81 1065/15.8/1.16 50% excess. *(If Schrader contains hydrocarbons, will bring cement 500' Will be run if Schrader above Schrader plus 50% excess.) contains hydrocarbons. Lead Tail Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 4-1/2" Liner 590/15.8/1.16 TOL will be set @ base of Kuparuk ,-,8625'MD. Class "G" Tail to TOL + 50% excess. Logging Program LWD Logging: 13-1/2" Hole MWD directional / GR 9-7/8" Hole MWD directional / GR / Res. 6-3/4" Hole MWD directional / GR / Res. Open Hole Logs (eline): 13-1/2" Hole 9-7/8" Hole No Logs needed 1) Platform Express (GR/RES/Den/NUE) 2) Dipole Sonic 3) NMR 4) Percussion SWC 5) MDT 6-3/4" Hole 1) Platform Express (GR/RES/Den/NUE) 2) Dipole Sonic 3) MDT possible. Cased Hole Logs (eline): 1) Platform Express (GR/RES/Den/NUE) pull Production interval logs thru casing to top of Kuparuk frm. Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon calculations below BOP equipment will be tested to 5000 psi Diverter, BOPE and drilling fluid system schematics for Nabors 7ES are on file with the AOGCC. Production Interval- , Maximum anticipated BHP: · Maximum surface pressure: 5362 psi @ 10,970' TVDss - Ivishak @ TD (9.4 ppg) 4265 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: 5000 psi Planned completion fluid: 8.4 ppg KCI Brine / 6.8 ppg Diesel Drilling Hazards/Contingencies: HYDROGEN SULFIDE - H2S · West Gwydyr Bay ice pad location is not designated as an H2S drill site, however Standard Operating Procedures for H2S precautions should be followed at all times. DRILLING CLOSE APPROACH: There are no Close approach issues. All existing wells in area are greater then 1300ft away and their current status is P&A. SURFACE HOLE SECTION: · The surface hole interval on V-200 was relatively problem free. · S-Pad surface holes: Minor tight hole has been encountered in the clay sections below the permafrost in the SV sands. · There is a potential of encountering shallow gas and a potential for encountering gas hydrates in the surface hole. In the event these are encountered, standard BP / Shared Services Drilling policies and well control practices will be followed. The drilling crew is MMS certified and proper tripping and well control procedures will be followed. · Beech State #1 to the south, experienced hydrate gas in the SV1 & SV2 sands. K pad in Milne Point to the west also has a history of hydrates below the permafrost. · Differential sticking could be problematic in this hole section adjacent to the permeable SV Sands. Avoid leaving drill string stationary for extended periods, tighten fluid loss properties of mud, and string in Barofibre prior to penetrating sand intervals. INTERMEDIATE HOLE SECTION: · No Major hole problems are anticipated. · The LOT test is planned after drilling 20' MD of formation. A LOT of 12.5 ppg EMW, which is -2.0 ppg over planned mud weight, would provide a kick tolerance for the 10-3A'' shoe of -392psi, 76 bbls, 2665' MD maximum height at the bit, assuming an influx of gas at TD of section, 10875' MD. · Ugnu and Schrader may be hydrocarbon-bearing. · There is a potential of drilling into shallow gas zones in the intermediate hole section. If gas is encountered, standard BP / Shared Services Drilling practices and well control policies will be followed. The drilling crew is MMS certified and proper tripping and well control procedures will be followed. · Kingak shale and lost circulation practices will be used while drilling this hole section. · The well path will cross one fault with - 200' of throw in the Kingak formation. This fault is not expected to have lost circulation, however, it will be discussed within the well plan and measures will be taken to control lost circulation or other problems associated with drilling across the fault. PRODUCTION SECTION: No major hole problems are anticipated in this section. No faults are predicted. Lost circulation plan will be in place if losses are encountered. A FIT test to 12.5 ppg is planned after drilling 20' MD of formation using existing 10.5 ppg mud system. A FIT of 12.5 ppg EMW, which is -2.5 ppg over planned mud weight, would provide an infinite kick tolerance for the 7 5/8" shoe, 4839' MD maximum height at the bit, (-3787' MD above shoe), assuming an influx of gas at TD of section, 11927' MD. Disposal: · No annular injection in this well. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I wastes to Pad 3 for disposal. DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rig Work: The 20" conductor will be set during ice pad construction. 1. Construct 6 mile ice road and pad Northwest of S-Pad. 2. Install 20" Conductor on Ice-pad. 3. Weld an FMC landing ring for the FMC Gen. V Wellhead on the conductor. 4. If necessary, level the pad and prepare location for rig move, Rig 1. 2. 3. Operations: MIRU Nabors 7ES. Nipple up and function test 21-1/4" diverter system. PU 5" DP as required and stand back in derrick. MU 13-1/2" drilling assembly and drill surface hole to approximately 3754' MD / 3754' TVD. The actual surface hole TD will be +/-10' above the SV1 target sands. 4. Run and cement the 10-3/4", 45.5# L-80 to casing to surface with Halliburton ES cementer (two stage surface cement job). 5. ND diverter system and NU casing / tubing head. NU BOPE and test to 5000 psi. 6. MU 9-7/8" drilling assembly and RIH to float collar. Test the 10-3/4" casing to 3000 psi for 30 minutes. 7. Drill out shoe joints and displace well to 10.0 ppg 6% KCI fluid. Drill new formation to 20' below 10~3/4" shoe and perform Leak Off Test. 8. Drill ahead to planned KOP at approximately 6350' MD / 6350' TVD. Build angle at 4°/100' to a tangent angle of 35°. 9. Drill ahead to target #1 and through base of Kuparuk River formation. POOH for open hole logging, RFT and SWC. Depending on hole conditions, a clean out assembly may be run between logging runs. 10. MU 9-7/8" drilling assembly and drill ahead to TD of intermediate section; top of Sag River at -10875'MD / 10108' TVD. POOH. Lay down 5" DP. 11. Run and cement the 7-5/8", 29.7# intermediate casing 1000' above Kuparuk formation. Cement will be brought 500' above the Schrader formation if hydrocarbons are present. 12. Test BOPE to 5000 psi. 13. MU 6-3/4" drilling assembly and RIH to float collar. Test the 7-5/8" casing to 3000 psi for 30 minutes. 14. Drill out shoe joints with existing ~10.5 ppg 6% KCI fluid. Drill new formation to 20' below 7-5/8" shoe and perform FIT to 12.5 ppg EMW. Circulate to change mud system over to a 9.8 ppg 3% KCI fuild. 15. Drill ahead to TD of production hole base of Ivishak formation, -11927' MD / 11023' TVD. POOH for open hole logging and RFT's. Depending on hole conditions, a clean out assembly may be run prior to running liner. 16. Run in hole with the 4 ½" 12.6# L-80 Liner Assembly and cement in place. Set the liner top packer @ -8625'MD/8319'TVD and POOH laying down DP and liner running tools. 17. Test the 4-1/2" liner to 3000 psi for 30 minutes. 18. Run 3-1/2", 9.3# L-80 8rd EUE completion. Set 3-1/2"x 7-5/8" production packer -100' above Kuparuk River, -8000' MD. Test tubing to 3000 psi for 30 min. See attached completion schematic for details. 19. Install two-way check. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Pull two-way check and freeze protect the well to -2000' TVD. 20. Install BPV. Secure the well and rig down / move off 7ES. 21. The well is planned to be tested by the PEs after the drilling rig is moved off of the well. 22. Based on the results of the testing operations, the well will either be "suspended" or permanently abandoned. If the well is suspended, appropriate plugs will be placed in accordance with 20 AAC 25.110 (with reference to the plugging requirements of 20 AAC 25.112). The suspended well will be left in a condition allowing possible subsequent permanent abandonment without the use of a drilling rig if required. If the well is permanently abandoned, the appropriate plugs and markers according to 20 AAC 25.110 will be placed. The pad will be cleaned up of any surface debris. Estimated Spud Date: 1/17/00 Allen Sherritt Shared Services Drilling Operations Drilling Engineer, 564-5204 Re: Gwydyr permit .-.. · Subject: Re: Gwydyr permit Date: Wed, 29 Dec 1999 15:41:27 -0900 From: Blair Wondzell <blair_wondzell~admin.state.ak.us> Organization: State of Alaska, Dept of Admin, Oil & Gas To: "Stone, Dan M (ARCO)" <StoneDM~BP.com> CC: "Kolstad, Scott R (ARCO)" <KolstaSR~BP.com>, "Sherritt, Allen (ARCO)" <SherriJA~BP.com> Dan, Thanks for the change. We'll now be able to continue processing the permit. Have a good New Years. Blair 12/IR/Rg. "Stone, Dan M (ARCO)" wrote: > Blair, per our conversation this morning: > > A change has been made to the West Gwydyr #1 Permit to Drill application > > to meet AOGCC requirements if the well is suspended. Line 22 of the > > submitted "Drill and Complete Procedure Summary" (attachment to the Permit > > to Drill) should be changed to read as follows. > > 22. Based on the results of the testing operations, the well will either > > be "suspended" or permanently abandoned. If the well is suspended, > > appropriate plugs will be placed in accordance with 20 AAC 25.110 (with > > reference to the plugging requirements of 20 AAC 25. 112). The suspended > > well will be left in a condition allowing possible subsequent permanent > > abandonment without the use of a drilling rig if required. If the well is > > permanently abandoned, the appropriate plugs and markers according to 20 > > AAC 25.110 will be placed. The pad will be cleaned up of any surface > > debris. > Thanks for your help, > Dan Stone > Senior Drilling Engineer > Shared Services Drilling 1 of 1 12/29/99 3:41 PM _ hare. d Alaska; rilling To: Steve Davies / AOGCC From' Scott Kolstad Date: 12/21/99 RE: W. Gwydyr 01 Transit Time and Offset Well Data Attached please find velocity Vs. depth plots proximal to W. Gwydyr 01 and plots of mud weight Vs. depth for offset wells in the area. After analyzing both sets of data, we do not expect to encounter any abnormally geo- pressured stata while drilling W. Gwydyr 01. I hope this meets with your approval to satisfy the AOGCC regulation requirements for W. Gwydyr 01, and the permit to drill process can proceed. Please contact me at 564-5347 if you have additional questions. 120 100 Depth - feet o ~oo ~___ ~o Depth, feet GRAPH Transit ting.Ms BP Amoeo Confidential 12/21/1999 DATA Fullsail 3D Dataset Stacking Velocity Pairs Proximal to West Gwydyr 01 Proposed Location Time in Millisecconds and Velocity in Feet/Second IL:1352 X:606477 Time 15 351 502 586 781 879 959 1134 1255 1541 1668 1823 1927 2004 2142 2249 2392 3981 Tr:395 IL: 1352 Tr :419 IL: 1352 Y:6005071 X:608125 Y:6007133 X:609774 Depth Velocity Time Depth Velocity Time 88 11676 15 88 11740 15 1751 9977 506 2418 9558 374 2421 9644 591 2718 9199 537 2690 9182 765 3389 8859 778 3324 8511 916 4028 8794 989 3676 8364 1131 4894 8655 1071 4124 8601 1279 5509 8614 1297 4797 8461 1396 6064 8687 1661 5316 8472 1661 7536 9074 1756 6929 8993 1758 8056 9165 1867 7529 9027 1984 9194 9268 2024 8436 9255 2061 9694 9407 2247 8878 9214 2159 10236 9482 2364 9200 9182 2280 10871 9536 2482 10075 9407 2446 12597 10300 3975 11110 9880 3981 24674 12396 12154 10162 24674 12396 IL:1352 IL:1352 IL:1352 Tr:395 Tr:419 Tr:443 X:606477 X:608125 X:609774 Y:6005071 Y:6007133 Y:6009195 Depth 89 1932 2599 3363 4277 4595 5564 7376 7967 8587 9563 10528 11627 12654 24641 Tr:443 Y:6009195 Velocity 11869 10334 9681 8644 8649 8580 8580 8881 9074 9199 9450 9371 9837 10197 12398 Page 1 Plaghm Beechey Pt. #1 Plaghm Beechey Point # 1 Depth Mud Density 5300 9.3 5950 9.2 7030 9.7 8820 9.9 8630 9.2 8920 9.8 9070 9.9 9400 10.1 9600 10.2 10000 10.1 10640 10.5 10950 10.2 11150 10.3 11320 10.6 11550 10.6 11720 10.5 lO.6 10.4 10.2 9.6 9.4 9.2 Plaghm Beechey Point # 1 2000 4000 6000 Measured Depth (ft) 800O 10000 12000 Page 1 Gwydyr Bay St. 4/1 Gwydyr Bay State Unit 4/1 Depth Mud Weight 1700 9.7 2275 9.7 3150 9.1 3660 9.3 4100 8.9 4450 9 4750 9.1 4925 9 5600 9 6220 9.1 6775 9.3 7650 9.4 8000 9.5 8100 9.5 8200 9.6 8520 9.6 8600 9.7 8680 9.6 8900 9.8 9150 9.9 9250 10 9380 10.5 9560 10.8 9800 10.8 10220 10.8 12 lO 8 Gwydyr Bay State Unit # 1 2000 4000 6000 8000 10000 Measured Depth (ft) 12000 Mud Weight J Page 2 Cascade # 1 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9309 9309 9500 10000 10109 8.3 8.8 9.1 9.5 9.9 10.4 10.8 9.6 9.6 9.7 9.7 9.9 10.2 10.2 10,2 10,4 10,4 10,4 10,6 10.6 9.7 9.7 9,7 9,7 11 10.5 10 9.5 9 8.5 Cascade #1 Weight to circ. out gas on connections 0 0 0 0 0 0 0 0 0 03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO 0 · - Od CO ~:~ LO CC) I~ O0 03 03 0 Depth ( ft ) Cascade # lA Depth M.Wt. 2600 10.2 3100 10.2 4600 10.3 5100 10.3 5600 10.5 7100 10.5 7600 10.5 8100 10.6 8600 10.6 9175 10.6 lO.6 lO.5 ~ lO.4 ._~ 10.3 10,2 10.1 10 Cascade # lA 2600 3100 4600 5100 5600 7100 7600 8100 8600 9175 Depth Long Island #1 Depth M.Wt. 2630 9.1 2692 9.1 6310 9.4 7142 9.4 7174 9.4 9503 9.9 11568 10.8 10.8 10.6 10.4 10.2 10 9.8 9.6 9.4 9.2 Long Island # 1 2000 4000 6OO0 Measured Depth 8OOO I0000 12000 .Wt. .... ' STATE OF ALASKA - ALASi-.,, OIL AND GAS CONSERVATION CO: MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 53.5' Prudhoe Bay Field / Undefined 3. Address 6. Property Designation ,4,.,¢ Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028234 O~_~2.5"~, /~ 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 3509' NSL, 5066' WEL, SEC. 04, T12N, R12E, UM (As Staked) Exploration At top of productive interval 8. Well Number Number 25100302630-277 4204' NSL, 4754' WEL, SEC. 04, T12N, R12E, UM West Gwydyr #1 Attotal depth 9. Approximate spud date Amount $200,000.00 929' NSL, 4917' WEL, SEC. 32, T13N, R12E, UM 01/10/2000 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028253, 929' MDI No Close Approach 2560 11927' MD / 10970' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 6350' MD Maximum Hole Angle 35 ° Maximum surface 4265 psig, At total depth (TVD) 10970' / 5362 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement ,,, Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) ....... 30" 20" 91.5# H-40 Weld 80' Surface Surface 80' 80' 260 sx Arctic Set (Approx.) ":1'"3-1/:51' 10-3/4" 45.5# L-80 BTC 3754' Surface Surface 3754' 3700' 148 sx PF, 273 sx Class 'G', 839 sx PF 9-7/8" 7-5/8" 29.7# L-80 BTC-M 10875' Surface Surface 10875' 10108' 279 sx Class'G' 6-3/4" 4-1/2" 12.6# L-80 IBT-M 3302' 8625' 8265' 11927' 10970' 590 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production ' Liner :';.~ ~'' ,---.'~ ;... ~ ~.,-,. ,erforationdepth, measured 0RiGIr, JAL. true vertical -..,, 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Allen Sherritf, 564-5204 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed DanStone ~--------~-~..._ ¢,',, Title Senior Drilling Engineer Date Commission Use Only I APl Number [ ApprovalD~e I See cover letter Permit N,~.~:~ /¢,~./ 50-~.)~:~..~. ,,,~-.~2.~'¢'~:~ ~-[L~.~- CDL) for other requirements Conditions of Approval: Samples Required ,l~Yes [] No Mud Log Required ~rYes [] No Hydrogen Sulfide Measures []Yes [] No Directional Survey Required .~]'Yes [] No Required Working Pressure for BOPE [] 2K; [] 3K; I-'I4K; ~K; ['-I 10K; [-I 15K Other: ORIGINAL SIGNED- BY by order of Approved By Roi~rtN. Ghriston$on Commissioner the commission Date ~' . Form 10-401 Rev. 12-01-85 Submit In Triplicate IWell Name: West Gwydyr #1 Weft Plan Summary Type of Well (producer or injector): I Exploration/Appraisal Producer Surface Location: 3509' FSL, 5066' FEL, T12N, R12E, S4 * As staked X = 607366, Y = 6005938 Target Location: #1 Target Location: ~2 Target Location: fl¢3 4204' FSL, 4754' FEL, T12N, R12E, S4 X = 607666 Y = 6006637 4899'FSL, 4443'FEL, T12N, R12E, S4 X = 607965 Y = 6007337 299' FSL, 5200'FEL, T13N, R12E, S32 X = 608258 Y = 6008021 BoSom Hole Location: 929' FSL, 4917'FEL, T13N, R12E, S32 X = 608530 Y = 6008655 I AFE Number: 1685105 I Estimated Start Date: I 1/10/00 I I Rig: I Nabors7ES I Operating days to complete: IMD: I11927' I ITvD: 110970'ss I IRKB/SurfaceElevation(a.m.s.I) ~53.5'/23.5' 131 Well Design (conventional, slimhole, etc.): IConventional slimhole "Slant" Shaped well. Deep kick-off in the West Sak formation maintaining 35° deg tangent angle to TD in the base of Ivishak. Objective: Evaluate the well-bore for hydrocarbon presence and characteristics of the Kuparuk, Jurassic, Sag River and Ivishak reservoirs. Determine reservoir volume and demonstrate economic production rates with test program. Formation Markers Formation Tops MD TVD (SS) Slimhole Design Base Permafrost 1854 1800 Based on offset West Kup. & NWE State #1 3754 3700 Surface casing point in shale, 10-3/4" 45.5# L-80 Surface casing below the hydrate zone in the SV1 and above the potential hydrocarbon zone - Ugnu. K-15 (Ugnu) 3974 3920 Pore Pressure estimated at 9.8-10.0 ppg EMW K-13 (West Sak / 5169 5115 Pore Pressure estimated at 8.7 ppg Schrader) EMW 6350 6297 Begin Build 4°/100 7225 7118 End Build - Tangent 35.0°; Azi. - 24.0° HRZ 7580 7409 Kalubik 7723 7526 Kuparuk 8100 7835 Top of Kuparuk reservoir Kuparuk O1 8112 7855 Primary Target - Pore pressure estimated at 9.4 to 10.0 ppg EMW. An MDT and SWC will be performed in this interval. Miluveach 8625 8265 Jurassic 9427 8922 Secondary Target- Pore pressure estimated at 9.4 to 10.0 ppg EMW. Kingak 9622 9082 10875 10108 Intermediate Casing Point. 7-5/8" 29.7# L-80 will set in the base of the Kingak, above the top Sag River.. Sag River 10875 10108 Third Target - Pore pressure estimated at 9.3 to 9.4 ppg EMW. Sh ublik 10964 10181 Ivishak 11102 10294 Pore pressure estimated at 9.3 to 9.4 ppg EMW. TD 11927 10970 Production Liner, 4-1/2" 12.6# L-80 in the base of Ivishak formation. Casing/Tubinc. Proc ram: Slimhole Desic:n Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVDss MD/TVDss 30" 20" 91.5# H40 WELD 80' surface 80'/80' 13-1/2" 10-3/4" 45.5# L-80 BTC 3754' surface 3754'/3700' 9-7/8" 7-5/8" 29.7# L-80 BTCM 10875' surface 10875'/10108' 6-3/4" 4-1/2" 12.6# L-80 IBT-Mod 3302' 8625'/8265' 11927'/10970' Tubing 3-1/2" 9.3# L-80 8RD EUE 8000' surface 8000'/7752' General Mud Program: Slimhole w/4 Liner Surface Mud Properties: Extended Bentonite 13-1/2" hole section Spud Mud Density Funnel Yield 10 sec 10 min pH APl (PPG) Viscosity Point gel gel Filtrate 8.6 300+ 40 20 30 9 NC to to to to to 10.0 100 65 30 40 10 Intermediate Mud Properties: 6% KCI fluid 9-7/8" hole section Density Viscosity Yield 10 sec 10 min APl HTHP (PPG) Point gel gel Filtrate Filtrate Initial 10 40 8 4 15 <6 <10 by HRZ Final 10.4 55 20 10 25 <6 <10 Production Mud Properties: 3%KCI fluid 6 3,4" hole section Density Funnel Yield 10 sec 10 min pH APl HTHP (PPG) Viscosity Point ~lel gel Filtrate Filtrate 9.8 40-55 15-20 4-10 12-20 8.5-9.5 <6.0 <10.0 Directional KOP: +_6350' MD - 4°/100' build Maximum Hole Angle: _+35.0° - Slant Well None Close Approach Well: Cement: Slimhole w/4 Liner First Stage Second Stage Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 10-3/4" surface Permafrost Lead: Permafrost Lead: Two Stage Job: 148/10.7/4.44 839/10.7/4.44 First stage calculated as Class "G" tail 500' TVD from TD (3254' md) with 50% Class "G" tail: excess. Lead Arcticset from 3254' md to 273/15.8/1.16 ES cementer 2054' md @ 50% excess. Second stage calculated as Arcticset 10.7 ppg Permafrost lead from 2054' to surface @ 350% excess. Lead ** Tail Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 7-5/8" Silicate Slurry: Class "G" tail: Class "G" Tail, Top 1000' above Kuparuk, Intermediate 279/11.5/2.81 1065/15.8/1.16 50% excess. *(If Schrader contains hydrocarbons, will bring cement 500' Will be run if Schrader above Schrader plus 50% excess.) contains hydrocarbons. Lead Tail Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 4-1/2" Liner 590/15.8/1.16 TOL will be set @ base of Kuparuk ~8625'MD. Class "G" Tail to TOL + 50% excess. Logging Program LWD Logging: 13-1/2" Hole 9-7/8" Hole 6-3/4" Hole Open Hole Logs (eline): 13-1/2" Hole 9-7/8" Hole 6-3/4" Hole Cased Hole Logs (eline): MWD directional/GR MWD directional/GR / Res. MWD directional/GR / Res. No Logs needed 1) Platform Express (GR/RES/Den/NUE) 2) Dipole Sonic 3) NMR 4) Percussion SWC 5) MDT 1) Platform Express (GR/RES/Den/NUE) 2) Dipole Sonic 3) MDT possible. 1) Platform Express (GR/RES/Den/NUE) pull Production interval logs thru casing to top of Kuparuk rrm. Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon calculations below BOP equipment will be tested to 5000 psi Diverter, BOPE and drilling fluid system schematics for Nabors 7ES are on file with the AOGCC. Production Interval- . Maximum anticipated BHP: · Maximum surface pressure: 5362 psi @ 10,970' TVDss - Ivishak @ TD (9.4 ppg) 4265 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: 5000 psi Planned completion fluid: 8.4 ppg KCI Brine / 6.8 ppg Diesel Drilling Hazards/Contingencies: HYDROGEN SULFIDE - H2S · West Gwydyr Bay ice pad location is not designated as an H2S drill site, however Standard Operating Procedures for H2S precautions should be followed at all times. DRILLING CLOSE APPROACH: There are no Close approach issues. All existing wells in area are greater then 1300ft away and their current status is P&A. SURFACE HOLE SECTION: · The surface hole interval on V-200 was relatively problem free. · S-Pad surface holes: Minor tight hole has been encountered in the clay sections below the permafrost in the SV sands. · There is a potential of encountering shallow gas and a potential for encountering gas hydrates in the surface hole. In the event these are encountered, standard BP / Shared Services Drilling policies and well control practices will be followed. The drilling crew is MMS certified and proper tripping and well control procedures will be followed. · Beech State #1 to the south, experienced hydrate gas in the SV1 & SV2 sands. K pad in Milne Point to the west also has a history of hydrates below the permafrost. · Differential sticking could be problematic in this hole section adjacent to the permeable SV Sands. Avoid leaving drill string stationary for extended periods, tighten fluid loss properties of mud, and string in Barofibre prior to penetrating sand intervals. INTERMEDIATE HOLE SECTION: · No Major hole problems are anticipated. · The LOT test is planned after drilling 20' MD of formation. A LOT of 12.5 ppg EMW, which is -2.0 ppg over planned mud weight, would provide a kick tolerance for the 10-3,~'' shoe of -392psi, 76 bbis, 2665' MD maximum height at the bit, assuming an influx of gas at TD of section, 10875' MD. · Ugnu and Schrader may be hydrocarbon-bearing. · There is a potential of drilling into shallow gas zones in the intermediate hole section. If gas is encountered, standard BP / Shared Services Drilling practices and well control policies will be followed. The drilling crew is MMS certified and proper tripping and well control procedures will be followed. · Kingak shale and lost circulation practices will be used while drilling this hole section. · The well path will cross one fault with - 200' of throw in the Kingak formation. This fault is not expected to have lost circulation, however, it will be discussed within the well plan and measures will be taken to control lost circulation or other problems associated with drilling across the fault. PRODUCTION SECTION: No major hole problems are anticipated in this section. No faults are predicted. Lost circulation plan will be in place if losses are encountered. A FIT test to 12.5 ppg is planned after drilling 20' MD of formation using existing 10.5 ppg mud system. A FIT of 12.5 ppg EMW, which is -2.5 ppg over planned mud weight, would provide an infinite kick tolerance for the 7 5/8" shoe, 4839' MD maximum height at the bit, (-3787' MD above shoe), assuming an influx of gas at TD of section, 11927' MD. Disposal: · No annular injection in this well. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I wastes to Pad 3 for disposal. DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rig Work: The 20" conductor will be set during ice pad construction. 1. Construct 6 mile ice road and pad Northwest of S-Pad. 2. Install 20" Conductor on Ice-pad. 3. Weld an FMC landing ring for the FMC Gen. V Wellhead on the conductor. 4. If necessary, level the pad and prepare location for rig move. Rig 1. 2. 3. . , 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. Operations: MIRU Nabors 7ES. Nipple up and function test 21-1/4" diverter system. PU 5" DP as required and stand back in derrick. MU 13-1/2" drilling assembly and drill surface hole to approximately 3754' MD / 3754' TVD. The actual surface hole TD will be +/-10' above the SV1 target sands. Run and cement the 10-3/4", 45.5# L-80 to casing to surface with Halliburton ES cementer (two stage surface cement job). ND diverter system and NU casing / tubing head. NU BOPE and test to 5000 psi. MU 9-7/8" drilling assembly and RIH to float collar. Test the 10-3/4' casing to 3000 psi for 30 minutes. Drill out shoe joints and displace well to 10.0 ppg 6% KCI fluid. Drill new formation to 20' below 10-3/4" shoe and perform Leak Off Test. Drill ahead to planned KOP at approximately 6350' MD / 6350' 'I'VD. Build angle at 4°/100' to a tangent angle of 35°. Drill ahead to target #1 and through base of Kuparuk River formation. POOH for open hole logging, RFT and SWC. Depending on hole conditions, a clean out assembly may be run between logging runs. MU 9-7/8" drilling assembly and drill ahead to TD of intermediate section; top of Sag River at -10875'MD / 10108' TVD. POOH. Lay down 5" DP. Run and cement the 7-5/8", 29.7# intermediate casing 1000' above Kuparuk formation. Cement will be brought 500' above the Schrader formation if hydrocarbons are present. Test BOPE to 5000 psi. MU 6-3/4" drilling assembly and RIH to float collar. Test the 7-5/8" casing to 3000 psi for 30 minutes. Drill out shoe joints with existing -10.5 ppg 6% KCI fluid. Drill new formation to 20' below 7-5/8" shoe and perform FIT to 12.5 ppg EMW. Circulate to change mud system over to a 9.8 ppg 3% KCI fuild. Drill ahead to TD of production hole base of Ivishak formation, -11927' MD / 11023' TVD. POOH for open hole logging and RFT's. Depending on hole conditions, a clean out assembly may be run prior to running liner. Run in hole with the 4 1~, 12.6# L-80 Liner Assembly and cement in place. Set the liner top packer @ -8625'MD/8319'TVD and POOH laying down DP and liner running tools. Test the 4-1/2" liner to 3000 psi for 30 minutes. Run 3-1/2", 9.3# L-80 8rd EUE completion. Set 3-1/2"x 7-5/8" production packer -100' above Kuparuk River, -8000' MD. Test tubing to 3000 psi for 30 min. See attached completion schematic for details. Install two-way check. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Pull two-way check and freeze protect the well to -2000' TVD. Install BPV. Secure the well and rig down / move off 7ES. The well is planned to be tested by the PEs after the drilling rig is moved off of the well. Based on the results of the testing operations, the well will either be "suspended" or permanently abandoned. If the well is suspended, appropriate plugs will be placed in accordance with 20 AAC 25.110 (with reference to the plugging requirements of 20 AAC 25.112). The suspended well will be left in a condition allowing possible subsequent permanent abandonment without the use of a drilling rig if required. If the well is permanently abandoned, the appropriate plugs and markers according to 20 AAC 25.110 will be placed. The pad will be cleaned up of any surface debris. Estimated Spud Date: 1/17/00 Allen Sherritt Shared Services Drilling Operations Drilling Engineer, 564-5204 West Gwydyr #1 PROPOSED COMPLETION DESIGN 13-1/2" Hole size X Nipple @ + 2000' MD. 10-3/4" Type H-ES cementer @ 2054' MD. 10-3/4" 45.5# L-80 BTC Casing 3,754' MD 3-1/2" L-80, 9.3#, EUE 8rd Tubing 9-7/8" Hole Size ..... ...................... :~:. ~:~:.~:~:~:~:~:.~::~:~ ............................ ....................... ............................. .............................. Hole Size Gas Lift Mandrels set @; 2200', 4000', 5800', 7560' TVD 2200', 4000', 5800', 7700' MD Wellhead 3 1/2" Completion: FMC New Standard Slimhole Wellhead 4 1/2" Tubing Hanger (XO to 3 1/2") Cameron 4 1/16" 5K ACTD (Carbon) Tree "X" nipple only completion. 7-5/8"x 3-1/2" Production packer @ + 7,900' MD "X" nipple only completion. 3-1/2" Tubing Tail @ + 8,000' MD (-100' MD above TKup.) Top of 4-1/2" L-80, 12.6#, IBT-MOD Liner @ + 8,625' MD (Set at base of Kup.) 7-5/8", 29.7# L-80 BTC Casing 10,875' MD ~-.~:~:..:~::~:~: ~ ====================== :;.:;.::w.....::..::; :~'.::'.:::.'::4~'.::'.::'.' ~.:?¢~.~.~.~.~ ~::;~:~ 4-~/2" Solid cemented linor to ID ~ ~ ~,~27' MD Date Revised by Comments 12/06/98 JAS Exploration/Appraisal WELL: W. Gwydyr #1 APl #: 50-029-? Gwydyr Kick Tol Surf.>., 12/9/1999 11:29 AM West Gwydyr # 1 Surface <:: Data Input Allen Sherritt <== Data Input Mud Weight (ppg) 10.50 For Well Plans: Mud Wt. = Zone of interest pore pressure Weak point - Measured depth (tt) Weak point - True vertical depth (fi) Weak point - Hole angle (deg) Weak point - Hole size (in) Weak point pressure - EMW (ppg) 3,774' 3,774' 0.0° 9.875" 12.50 Zone of interest - Measured depth (ft) Zone of interest - True vertical depth (ft) Zone of interest - Hole angle (deg) Zone of interest - Hole size (in) Zone of interest - Pore pressure EMW (ppg) 10,875' 10,161' 35.0° 9.625" 9.40 Gas gradient (psi/fi) 0.10 Bottom hole assembly OD (in) Bottom hole assembly length (fi) Drill pipe OD (in) 6.750" 300' 5.000" BHA annular vol. @ zone of interest (bbl/ft) 0.0457 ;DP annular vol. @ zone of interest (bbl/ft) 0.0657 'DP annular vol. @ weak point (bbl/fi) 0.0704 Additional safety margin (psi) <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input 0.00 <== Data Input Weak point pressure (psi): Plo 2,453 psi Weak point pressure - Safety margin: Pmax 2,453 psi Pmax EMW 12,50 ppg Max anticipated formation pressure (psi): Pf 4,967 psi Weak Pt to Zone of Interest distance (TVD fi): OH {TVD) 6,387' Weak Pt to Zone of Interest distance (MD fi): OH (MD} 7,101' Maximum influx height at the bit (TVD fi): H {TVD} 2,183' Maximum influx height at the bit (MD ft): H (MD]} 2,665' Calc. volume of (Hi around BHA: Vlbha Calc. volume of tH} around drill pipe: Vldp 13.7 bbl 155.4 bbl Calc. volume that H equals @ initial shut in: Vl 169.1 bbl vol. that H equals @ weak point (MD fi): Vwp 153.8 bbl Calc. volume of Vwp @ initial shut in: V2 76.0 bbl Kick Tolerance: V2 76.0 bbl Initial SICP which equals the Weak Point Pressure: 392 psi NOTE: 11J22J94 Shared Services Drilling I DrilIQuesf 18120.03 10 3/4" Casing L 3753.50 MD 3753.50 TVD · ~ .............................. U~,;;: 'i~i. Yo' W6 ........................... i~';i~'~'.'f £ dg Yd W6 Start Dir @ 4.000°/10Oft: 6350.O0ft MD, 6350.0Oft TVD Dir: 7225.00ft MD, 7171.59ft 'rVD ................. 22: 7:/~ ~,',,:, v~ _~; ?.4.<: ;~ Katubf~ - 7579,50 TVD Milm'each - 8318.50 TVD \ ~! ? .~, ~ : ~ .,,,~Xj~. IYG-~I FAULT ......... .. y-y,...i,L..- · ~7~'~,~~.~o ................ ~ ....... ? , ~m /10875.01 MD 4 1/2" Liar I '~ ~11927.32 MD I B~ 11~3 ~WD II '~ 0 1500 3000 Section ~imuth: 24.000° ~me NoAh) Venial Section WG-01 Wp4-3 2800 - 2100 - 400 - 10 3/4" Casing 3753.50 MD 3753.50 TVD 700 - II 'M 0 O Eastings Scale: linch = 700ft 4 1/2" Liner 0 700 11927.32 MD 1 400 I ,, ...... , .....I 11023.,50TVD~, ...... ,.,. ~,,.,,, ~ ..... ~'/..= ,~' .,,,,i,, , ~ ! · 7 . too ,~.® >,.,..-. ...... /l,:.:-I)i ti?, i J! ,"C;~.~,'..;~t I ~ l~ 0 0 ./ ,,';,'/'.:.:;h' 7! l) II z~.m~ :"tLv, u,~ A-. ;A-;,z/t. ~~ ~d Dir :7225.~MD, 7171.59~D "~S~d Dir ~ 4.0~°/100ff: 6~0.~ MD, ~.~ff ~D I Eastings 0 7~)~ 1 ~0 Reference ~s7rue No~ - 2800 7 5/8" Casing 108'/5.01 MD 10161.50 TVD - 2100 - 1400 '~ Proposal Data for WGW~DYR-01 Wp4-3 Vorl~al O~gin:We~l Hotizocrtar Origin: ilWe~l Measu reme~tUnils: No~lh Relem.nce: Tn..,e North Ve~lical Seclioo Az/rr~.~lh: 24.0C0° Ver~al Sec~on Demdp~rc We~l Vertical Section O,'/oin: O.EO N,O.00 E MeasuredInet. Aztm. VerticalNorlhlng* Ee,fln§$V~llcalDo~log Oepth Deplh S~clloo 0.00 0.0~0 0.:g240.00 0.00 lq 0.~0 EE 0.00 6350.00 0.0~0 0.~4 6350.00 0.00N 0J~0 7225.00 35.00024.00,0 7171.59 236.65 N 10536 E 259.05 4.00~ 8124.(=O35.0(D24.0007¢09,50 70S.O3 lq 315.24 E775,~d 0,000 9427.17 35.00024.O00~'~75.5013~0.56 N 619.12 E1522.160.0~) 109'75.01 35.0(024.00010161.502149.21 N 956.891]2352.~J0,0~0 11927.3235.00924.t~00 11023.502700.61 N 120239 E2956.180,0~0 Single Well Target Data for WGWYDYR-01 Staked Meastn'emenl unls: fl ~nale point 'rVDrkb 'P4Dae Norlhlng~ Eastlngs ASP Y ASP X En~yPoint 8983.50 8930.00 2OPS.31N 109&ggE ~(~OSZOSN (:O~435.22E Boumda~y~A 8953.50 8930.00 2C95.31N I098.98E O'$J0052.OSN 6(9435.22E 8983.50 8930.00 1566.99 N 8.35.17 E ~.fJ751699 Iq 12 8983.50 8920.00 1430.12N 771.O)E 6($)7579.21N D $983.99 $930.0;) 15:~6.99 N 835.17 E ~'$)751699 N 60~179.O8 E WG~J1 TI Poly ~ [kint 7905.50 7855.00623.53 N 165.45 E 6rJ~65z->t.c-.O N 6(.r/523.O0 E Bourda~yPoinz~ 79(8.50 7555.00 ~23.53 N 165.45 E 79(8.50 7555.00 1444.04N 136.25E 6rSJ7384.O)N 60748ZOOE C 79(8.50 7555.00 1472.24N 9S6.74E ~'$)7424.cDN D 79(8.50 7855.00 652-75N 99t.95E 6(O6~5.O)N 608342.(X)E WG~41T2PolyEnayPdnt 8975.50 8922.(D T20.24N 39~.8&E 60)O564.(..ON OT/751.0OE Bo. mdayl:kin~A 8975.50 8921007202.4N 3¢4.86E 60'~5~_>t.(DN 607751.COE B 8975.50 $922.00 1540.75N 3&5.67E 6rSJ7494.O)N 607710.COE DC 8975.50 8922_00 I,~S&95N 118616E 8975.50 892100 749.$6N 1214.37E 6fY36705.O)N 6C~570.00E WG-O1T3Poly EatlyP(int IO16LSO 10108.(,0 1652.$3N 5~.3OE ~'$)75~9.($)N 607912.OOE Bou~ Point A 1016L50 1010g.c;O 1652.$3 N 5OP.30 E ~-$)7,599.(O N ~)7912.O0 E (~ 10161.50 1010&c.O 2ffOA4 N 533.92 £ 60)8615.($) N (:O78152.CO E 10161.50 1010&eX;' 2t~9.1$N 1356.44 E 6rSJS1557.(J)N 608714.0OE D 10161.50 10lO&CO 1~2.57N 142LglE 6rSJ7641.O)N WG-O1Wp4TI EalzyPcint ?g(8.50 7855.00 7(~.03N 31524E 6rSJ~,.q).6tN 60767L56E WG-O1Wp~T2 Ezm~yPcin~ 8975.50 892Z00 13¢0,56N 619.12E 6(e7337.47N 6r. O965.$gE WG-O1 Wp4 T3 F_~ Poin~ 10161.,9) 1010&CO 214921N 956.89 E 6(O8100.9ON 60~292.41 E Spe, ry-Sun Drilling S=rvices Proposal Data- WGWYDYR-01 Staked- WGWYDYR-01 Wp4-3 9 December, 1999- 13:21 - 1- DrillQuest North Slope Alaska Alaska State Plane 4 EXPLORATION GB, Slot WGWYDYR-01 Staked WGWYDYR-01 Staked- WGWYD YR'01 Wp4-3 PROPOSAL REPORT 9 December, 1999 Surface Coordinates: 6005938.15 N, 607366.54 E (70° 25' 31.2527" N, 149° 07' 30.2996" W) Kelly Bushing: 53.50ft above Mean Sea Level DRILLING SERVICES Proposal Ref'. pro9511 Sperry-Sun Drilling Services Proposal Report for WGWYD YR-01 Staked- WGWYD YR-01 Wp4-3 North Slope Alaska Measured Depth Incl. Azim. 0.00 0.000 0.000 100.00 0.000 0.000 200.00 0.000 0.000 300.00 0.000 0.000 400.00 0.000 0.000 500.00 0.000 0.000 600.00 0.000 0.000 700.00 0.000 0.000 800.00 0.000 0.000 900.00 0.000 0.000 1000.00 0.000 0.000 1100.00 0.000 0.000 1200.00 0.000 0.000 1300.00 0.000 0.000 1400.00 0.000 0.000 1500.00 0.000 0.000 1600.00 0.000 0.000 1700.00 0.000 0.000 1800.00 0.000 0.000 1853.50 0.000 0.000 1900.00 0.000 0.000 2000.00 0.000 0.000 2100.00 0.000 0.000 2200.00 0.000 0.000 2300.00 0.000 0.000 Sub-Sea Depth (ft) -53.50 46.50 146.50 246.50 346.50 446.50 546.50 646.50 746.50 846.50 946.50 1046.50 1146.50 1246.50 1346.50 1446.50 1546.50 1646.50 1746.50 1800.00 1846.50 1946.50 2046.50 2146.50 2246.50 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings ~t) (fi) (fi) (fi) (fi) 0.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 100.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 200.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 300.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 400.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 500.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 600.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 700.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 800.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 900.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1000.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1100.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1200.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1300.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1400.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1500.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1600.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1700.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1800.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 1853.50 0.00 N 0.00 E 6005938.15 N 607366.54 E 1900.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 2000.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 2100.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 2200.00 0.00 N 0.00 E 6005938.15 N 607366.54 E 2300.00 0.00 N 0.00 E 6005938.15 N 607366.54 E Dogleg Rate (°/100ft) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Alaska State Plane 4 EXPLORATION GB Vertical Section (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 Comment B Perm ConEnued... 9 December, 1999 - 13:21 - 2 - DrillQuest 1,05,04c Sperry-Sun Drilling Services Proposal Report for WGWYDYR-01 Staked- WGWYDYR-01 Wp4-3 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Vertical Depth Depth (ft) (ft) 2400.00 0.000 0.000 2346.50 2400.00 2500.00 0.000 0.000 2446.50 2500.00 2600.00 0.000 0.000 2546.50 2600.00 2700.00 0.000 0.000 2646.50 2700.00 2800.00 0.000 0.000 2746.50 2800.00 2900.00 0.000 0.000 2846.50 2900.00 3000.00 0.000 0.000 2946.50 3000.00 3100.00 0.000 0.000 3046.50 3100.00 3200.00 0.000 0.000 3146.50 3200.00 3300.00 0.000 0.000 3246.50 3300.00 3400.00 0.000 0.000 3346.50 3400.00 3500.00 0.000 0.000 3446.50 3500.00 3600.00 0.000 0.000 3546.50 3600.00 3700.00 0.000 0.000 3646.50 3700.00 3753.50 0.000 0.000 3700.00 3753.50 3800.00 0.000 0.000 3746.50 3800.00 3900.00 0.000 0.000 3846.50 3900.00 3973.50 0.000 0.000 3920.00 3973.50 4000.00 0.000 0.000 3946.50 4000.00 4100.00 0.000 0.000 4046.50 4100.00 4200.00 0.000 0.000 4146.50 4200.00 4300.00 0.000 0.000 4246.50 4300.00 4400.00 0.000 0,000 4346.50 4400.00 4500.00 0.000 0,000 4446.50 4500.00 4600.00 0,000 0.000 4546.50 4600.00 Local Coordinates Northings (ft) 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N Global Coordinates 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0,00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N 0.00 N Eastings Northings Eastings (fi) 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938~15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0.00 E 6005938.15 N 607366.54 E 0,00 E 6005938.15 N 607366.54 E Dogleg Rate (°/100f~ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0,000 Alaska State Plane 4 EXPLORATION GB Vertical Section (ft) 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0,00 Comment 10 3/4" Casing Ugnu Continued... 9 December, 1999 - 13:21 - 3 - DrillQuest 1.05.04c Sperry-Sun Drilling Services Proposal Report for WGWYD YR-01 Staked- WGWYD YR-01 Wp4-3 North Slope Alaska Measured Depth Incl. Azim. 4700.00 0,000 0.000 4646.50 4700.00 4800.00 0.000 0.000 4746.50 4800.00 4900.00 0.000 0.000 4846.50 4900.00 5000.00 0.000 0.000 4946.50 5000.00 5100.00 0.000 0.000 5046.50 5100.00 5168.50 0.000 0.000 5115,00 5168.50 5200.00 0.000 0.000 5146.50 5200.00 5300.00 0.000 0.000 5246.50 5300.00 5400.00 0.000 0.000 5346.50 5400.00 5500.00 0.000 0.000 5446.50 5500.00 5600.00 0.000 0.000 5546.50 5600.00 5700.00 0.000 0.000 5646.50 5700.00 5800.00 0.000 0.000 5746.50 5800,00 5900.00 0.000 0.000 5846.50 5900.00 6000.00 0.000 0.000 5946.50 6000.00 6100.00 0.000 0.000 6046.50 6100.00 6200.00 0.000 0.000 6146.50 6200.00 6300.00 0.000 0.000 6246.50 6300.00 6350.00 0.000 0.000 6296.50 6350.00 6400.00 2.000 24.000 6346.49 6399.99 6500.00 6.000 24.000 6446.23 6499.73 6600.00 10.000 24.000 6545.23 6598.73 6700.00 14.000 24.000 6643.03 6696.53 6800.00 18.000 24.000 6739.13 6792.63 6900.00 22.000 24.000 6833.08 6886.58 Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Depth Northings Eastings Northings Eastings Rate ~ ~ (ft) (fi) (fi) (fi) (°/100f~ 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0,00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.00 N 0.00 E 6005938.15 N 607366.54 E 0.80 N 0.35E 6005938.95 N 607366.88 E 7.17 N 3.19 E 6005945.36N 607369.63 E 19,88 N 8.85 E 6005958.16 N 607375.10 E 38.87 N 17.31E 6005977.26 N 607383.28 E 64.05 N 28.51E 6006002.60 N 607394.13 E 95.28 N 42.42 E 6006034.03 N 607407.59 E 0,000 0.000 0,000 0.000 0,000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0,000 0.000 0.000 0.000 0.000 4.000 4.000 4.000 4.000 4.000 4.000 Alaska State Plane 4 EXPLORATION GB Vertical Section (ft) 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.87 7.85 21.76 42.55 70.11 104.30 Comment West Sak Start Dir @ 4.000°/100ft: 6350.00ft MD, 6350.00ft TVD ConNnued... 9 December, 1999- 13:21 -4- DrillQuest 1.05.04c Sperry-Sun Drilling Services Proposal Report for WGWYD YR-01 Staked - WGWYD YR-01 Wp4-3 North Slope Alaska Measured Depth Incl. Azim. 7000.00 26.000 24.000 7100.00 30.000 24.000 7200.00 34.000 24.000 7225.00 35.000 24.000 7300.00 35.000 24.000 7400.00 35.000 24.000 7500.00 35.000 24.000 7580.14 35.000 24.000 7600.00 35.000 24.000 7700.00 35.000 24.000 7722.97 35.000 24.000 7800.00 35.000 24.000 7900.00 35.000 24.000 8000.00 35.000 24.000 8100.00 35.000 24.000 8100.19 35.000 24.000 8124.60 35.000 24.000 8200.00 35.000 24.000 8300.00 35.000 24.000 8400.00 35.000 24.000 8500.00 35.000 24.000 8600.00 35.000 24.000 8625.12 35.000 24.000 8700.00 35.000 24.000 8800.00 35.000 24.000 Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Depth Nothings Eastings Northings Eastings Rate ~ ~ (fi) (fi) (fi) (fi) (°/100f~ 6924.42 6977.92 132.43 N 58.96 E 6006071.42 N 607423.59 E 4.000 7012.70 7066.20 175.31N 78.05 E 6006114.57 N 607442.06 E 4.000 7097.48 7150.98 223.71N 99.60 E 6006163.27 N 607462.92 E 4.000 7118.09 7171.59 236.65 N 105.36 E 6006176,29 N 607468.49 E 4.000 7179.52 7233.02 275.95 N 122.86 E 6006215.84 N 607485.42 E 0.000 7261.44 7314.94 328.35N 146.19 E 6006268.57 N 607507.99 E 0.000 7343.35 7396.85 380.75 N 169.52 E 6006321.30 N 607530.56 E 0.000 7409.00 7462.50 422.74 N 188,22 E 6006363.55 N 607548.65 E 0.000 7425.27 7478.77 433.15 N 192.85 E 6006374.03 N 607553.14 E 0.000 7507.18 7560.68 485.54 N 216.18 E 6006426.75 N 607575.71E 0.000 7526.00 7579.50 497.58 N 221.54 E 6006438.87 N 607580.90 E 0.000 7589.10 7642.60 537.94 N 239.51E 6006479.48 N 607598.28 E 0.000 7671.02 7724.52 590.34N 262.84 E 6006532.21N 607620.86 E 0.000 7752.93 7806.43 642.74 N 286.17 E 6006584.94 N 607643.43 E 0.000 7834.85 7888.35 695.14 N 309.50 E 6006637.67 N 607666.00 E 0.000 7835.00 7888.50 695.24 N 309.54 E 6006637.77 N 607666.05 E 0.000 7855.00 7908.50 708.03 N 315.24 E 6006650.64 N 607671.56 E 0.000 7916.76 7970.26 747.54 N 332.83 E 6006690.40 N 607688.58 E 0.000 7998.68 8052.18 799.94 N 356.15 E 6006743.13 N 607711.15 E 0.000 8080.59 8134.09 852.34N 379.48 E 6006795.86 N 607733.72 E 0.000 8162.51 8216.01 904.73 N 402.81E 6006848.59 N 607756.30 E 0.000 8244.42 8297.92 957.13 N 426.14 E 6006901.32 N 607778.87 E 0.000 8265.00 8318.50 970.30 N 432.00 E 6006914.56 N 607784.54 E 0.000 8326.34 8379.84 1009.53 N 449.47 E 6006954.04 N 607801.44 E 0.000 8408.25 8461.75 1061.93 N 472.80 E 6007006.77 N 607824.02 E 0.000 Alaska State Plane 4 EXPLORATION GB Ve~ical Section 144.97 191.90 244.89 259.05 302.06 359.42 416.78 462.74 474.14 531.49 544.67 588.85 646.21 703.57 760.92 761.03 775.04 818.28 875.64 933.00 990.36 1047.71 1062.12 1105.07 1162.43 Comment End Dir: 7225.00ft MD 7171.59ft TVD ' HRZ Kalubik Kup Riv Taraet - WG-01 Wp4 T1 Geological ' Miluveach Con§nued... 9 December, 1999 - 13:21 - 5 - DrillQuest 1,05,04c Sperry-Sun Drilling Services Proposal Report for WGWYDYR-01 Staked- WGWYDYR-01 Wp4-3 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Vertical Depth Depth (ft) (ft) 8900.00 35.000 24.000 8490.17 8543.67 9000.00 35.000 24.000 8572.08 8625.58 9100.00 35,000 24.000 8654.00 8707.50 9200.00 35.000 24.000 8735.91 8789.41 9300.00 35,000 24.000 8817.83 8871,33 9400.00 35.000 24.000 8899.74 8953.24 9427.17 35.000 24,000 8922.00 8975.50 9500.00 35,000 24.000 8981.66 9035.16 9600.00 35.000 24.000 9063.57 9117.07 9622.49 35.000 24.000 9082.00 9135.50 9700.00 35.000 24.000 9145.49 9198.99 9800.00 35.000 24.000 9227.40 9280.90 9900.00 35.000 24.000 9309.32 9362.82 10000.00 35.000 24.000 9391.23 9444.73 10100.00 35.000 24.000 9473.15 9526.65 10200.00 35.000 24.000 9555.07 9608.57 10300.00 35.000 24.000 9636.98 9690.48 10400.00 35.000 24.000 9718.90 9772.40 10500.00 35.000 24.000 9800.81 9854.31 10600.00 35.000 24.000 9882,73 9936.23 10700.00 35.000 24.000 9964.64 10018.14 10800.00 35.000 24.000 10046.56 10100.06 10875.01 35.000 24.000 10108.00 10161.50 10900.00 35.000 24.000 10128.47 10181.97 10964.13 35.000 24.000 10181.00 10234.50 Local Coordinates Global Coordinates Dogleg Nothings Eastings Northings Eastings Rate (fl) (fi) (fl) (fi) (~100f~ 1114.33 N 496.13 E 6007059.50 N 607846.59 E 0.000 1166,73 N 519.46 E 6007112.23 N 607869,16 E 0.000 1219.13 N 542.79 E 6007164.96 N 607891.73 E 0.000 1271.53 N 566.12 E 6007217.69 N 607914.31 E 0.000 1323,93 N 589.45 E 6007270,42 N 607936.88 E 0.000 1376.32 N 612.78 E 6007323.15 N 607959.45 E 0.000 1390.56 N 619.12 E 6007337.47 N 607965.59 E 0.000 1428.72 N 636.11E 6007375.88 N 607982.03 E 0.000 1481.12 N 659.44 E 6007428.61N 608004.60 E 0.000 1492.91N 664.69 E 6007440.47 N 608009.68 E 0.000 1533.52 N 682.77 E 6007481.34N 608027.17 E 0.000 1585.92 N 706.10 E 6007534.06 N 608049.75 E 0.000 1638.32 N 729.43 E 6007586.79 N 608072.32 E 0.000 1690.72 N 752.76 E 6007639.52 N 608094.89 E 0.000 1743.12 N 776.09 E 6007692.25 N 608117.47 E 0.000 1795.51N 799.41E 6007744.98 N 608140.04 E 0.000 1847.91N 822.74 E 6007797.71N 608162.61E 0.000 1900.31 N 846.07 E 6007850.44 N 608185.19 E 0.000 1952.71 N 869.40 E 6007903.17 N 608207.76 E 0.000 2005.11N 892.73 E 6007955.90 N 608230.33 E 0.000 2057.51N 916.06 E 6008008.63 N 608252.91E 0.000 2109.91 N 939.39E 6008061.35 N 608275.48 E 0.000 2149.21N 956.89 E 6008100.91N 608292.41E 0.000 2162.31 N 962.72 E 6008114.08 N 608298.05 E 0.000 2195.91 N 977.68 E 6008147.90 N 608312.53 E 0.000 Alaska State Plane 4 EXPLORATION GB Ve~ical Section 1219.79 1277.14 1334.50 1391.86 1449.22 1506.57 1522.16 1563.93 1621.29 1634.19 1678.65 1736.00 1793.36 1850.72 1908.08 1965.44 2022.79 2080.15 2137.51 2194.87 2252.22 2309.58 2352.60 2366.94 2403.72 Comment Tarclet- WG-01 Wp4 T2, Geological ~ngak _5/8~ .C asi ng ag ~lver ar.qet- WG-01 Wp4 T3, Geological Shublik Continued.., 9 December, 1999 - 13:21 - 6 - DrillQuest 1,05,04c Sperry-Sun Drilling Services Proposal Report for WGWYDYR-01 Staked- WGWYDYR-01 Wp4-3 North Slope Alaska Measured Depth Incl. Azim. 11000.00 35.000 24.000 11100.00 35.000 24.000 11102.07 35.000 24.000 11200.00 35.000 24.000 11300.00 35.000 24.000 11400.00 35.000 24.000 11500.00 35.000 24.000 11600.00 35.000 24.000 11700.00 35.000 24.000 11800.00 35.000 24.000 11900.00 35.000 24.000 11927.32 35.000 24.000 Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Depth NoAhings Eastings Northings Eastings Rate ~ ~ (fi) (fi) (fi) (fi) (°/100f~ 10210.39 10263.89 2214.71N 986.05 E 6008166.81N 608320.62 E 0.000 10292.30 10345.80 2267.10 N 1009.38E 6008219.54 N 608343.20 E 0.000 10294.00 10347.50 2268.19 N 1009.86 E 6008220.63 N 608343.67 E 0.000 10374.22 10427.72 2319.50 N 1032.71E 6008272,27 N 608365.77 E 0.000 10456.13 10509.63 2371.90 N 1056.04 E 6008325.00 N 608388.34 E 0.000 10538.05 10591.55 2424.30N 1079.37E 6008377.73 N 608410.92 E 0.000 10619.96 10673.46 2476.70 N 1102.70E 6008430.46 N 608433.49 E 0.000 10701.88 10755.38 2529.10 N 1126.03 E 6008483.19 N 608456.06 E 0.000 10783.79 10837.29 2581.50 N 1149.35E 6008535.92 N 608478.64 E 0.000 10865.71 10919.21 2633.90 N 1172.69 E 6008588.64 N 608501.21E 0.000 10947.62 11001.12 2686.29 N 1196.02 E 6008641.37 N 608523.78 E 0.000 10970.00 11023.50 2700.61N 1202.39E 6008655.78 N 608529.95 E 0.000 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vedical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 24.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11927.32ft., The Bottom Hole Displacement is 2956.18ft., in the Direction of 24.000° (True). Alaska State Plane 4 EXPLORATION GB Ve~ical Section 2424.30 2481.65 2482.84 2539.01 2596.37 2653.73 2711.08 2768.44 2825.80 2883.16 2940.52 2956.18 Comment Ivishak 4 1/2" Liner Continued... 9 December, 1999 - 13:21 - 7- DrillQuest 1.05,04c Sperry-Sun Drilling Services Proposal Report for WGWYD YR-01 Staked- WGWYD YR-01 Wp4-3 North Slope Alaska Alaska State Plane 4 EXPLORATION GB Comments Measured Depth (ft) 6350.00 7225.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 6350.00 0.00 N 0.00 E 7171.59 236.65 N 105.36 E Formation Tops Measured Vertical Sub-Sea Depth Depth Depth Northings (ft) (ft) (ft) (ft) 1853.50 1853.50 1800.00 0.00 N 3973.50 3973.50 3920.00 0.00 N 5168.50 5168.50 5115.00 0.00 N 7580.14 7462.50 7409.00 422.74 N 7722.97 7579.50 7526.00 497.58 N 8100.19 7888.50 7835.00 695.24 N 8625.12 8318.50 8265.00 970.30 N 9622.49 9135.50 9082.00 1492.91 N 10875.01 10161.50 10108.00 2149.21 N 10964.13 10234.50 10181.00 2195.91 N 11102.07 10347.50 10294.00 2268.19 N Comment Start Dir @ 4.000°/100ft: 6350.00ft MD, 6350.00ft TVD End Dir: 7225.00ft MD, 7171.59ft 'I-VD Eastings Formation Name (ft) 0.00 E B Perm 0.00 E Ugnu 0.00 E West Sak 188.22 E HRZ 221.54 E Kalubik 309.54 E Kup Riv 432.00 E Miluveach 664.69 E Kingak 956.89 E Sag River 977.68 E Shublik 1009.86 E Ivishak ConEnued... 9 December, 1999- 13:21 -8- DrillQuest 1,05,04c Sperry-Sun Drilling Services Proposal Report for WG WYD YR-01 Staked- WG WYD YR-01 Wp4-3 North Slope Alaska Alaska State Plane 4 EXPLORATION GB Casing details From To Measured Vertical Measured Depth Depth Depth (ft) (ft) (ft) <Surface> <Surface> 3753.50 <Surface> <Surface> 10875.01 <Surface> <Surface> 11927.32 Targets associated with this wellpath Target Name WG-01 FLT WG-01 T1 Poly Vertical Depth Casing Detail (ft) 3753.50 10 3/4" Casing 10161.50 7 5/8" Casing 11023.50 4 1/2" Liner Mean Sea Level/Global Coordinates: Geographical Coordinates: Target Boundary Point #1 #2 #3 #4 Mean Sea Level/Global Coordinates #1 #2 #3 #4 Geographical Coordinates #1 #2 #3 #4 Mean Sea Level/Global Coordinates: Geographical Coordinates: Target Entry Coordinates TVD Northings Eastings Target (ft) (ft) (ft) Shape 8983.50 2098.31 N 1098.98 E Polygon 8930.00 6008052.05 N 608435.22 E 70° 25' 51.8901" N 149° 06' 58.0522" W 8983.50 2098.31 N 1098.98 E 9533.50 1566.99 N 835.17 E 9853.50 1430.12 N 771.00 E 9533.50 1566.99 N 835.17 E 8930.00 6008052.05 N 608435.22 E 9480.00 6007516.99 N 608179.08 E 9800.00 6007379.21 N 608116.88 E 9480.00 6007516.99 N 608179.08 E 70° 25' 51.8901" N 149° 06' 58.0522" W 70° 25' 46.6646" N 149° 07' 05.7949" W 70° 25' 45.3184" N 149° 07' 07.6783" W 70° 25' 46.6646" N 149° 07' 05.7949" W 7908.50 623.53 N 165.45 E Polygon 7855.00 6006564.00 N 607523.00 E 70° 25' 37.3856" N 149° 07' 25.4458" W Target Type Geological Geological Con§hued... 9 December, 1999 - 13:21 - 9 - DrillQuest 1.05.04c Sperry-Sun Drilling Services Proposal Report for WGWYDYR-01 Staked- WGWYDYR-01 Wp4-3 North Slope Alaska Target Name Targets associated with this wellpath (Continued) WG-01 T2 Poly Target Boundary Point #1 #2 #3 #4 Mean Sea Level/Global CoordinateS #1 #2 #3 #4 Geographical Coordinates #1 #2 #3 #4 Mean Sea Level/Global Coordinates: Geographical Coordinates: Target Boundary Point #1 #2 #3 #4 Mean Sea Level/Global Coordinates #1 #2 #3 #4 Target Entry Coordinates TVD Northings Eastings (ft) (ft) (ft) 7908.50 623.53 N 165.45 E 7908.50 1444.04 N 136.25 E 7908.50 1472.24 N 956.74 E 7908.50 652.75 N 984.95 E 7855.00 6006564.00 N 607523.00 E 7855.00 6007384.00 N 607482.00 E 7855.00 6007424.00 N 608302.00 E 7855.00 6006605.00 N 608342.00 E 70° 25' 37.3856" N 149° 07' 25.4458" W 70° 25' 45.4558" N 149° 07' 26.3019" W 70° 25' 45.7325" N 149° 07' 02.2283" W 70° 25' 37.6723" N 149° 07' 01.4038" W 8975.50 720.24 N 394.86 E 8922.00 6008664.00 N 607751.00 E 70° 25' 38.3367" N 149° 07' 18.7153" W 8975.50 720.24 N 394.86 E 8975.50 1540.75 N 365.67 E 8975.50 1568.95 N 1186.16 E 8975.50 749.46 N 1214.37 E 8922.00 6006664.00 N 607751.00 E 8922.00 6007484.00 N 607710.00 E 8922.00 6007524.00 N 608530.00 E 8922.00 6006705.00 N 608570.00 E Alaska State Plane 4 EXPLORATION GB Target Target Shape Type Polygon Geological Con,hued... 9 December, 1999- 13:21 - 10- DrillQuest 1.05.04c Sperry-Sun Drilling Services Proposal Report for WG WYD YR-01 Staked- WG WYD YR-01 Wp4-3 North Slope Alaska Target Name Targets associated with this wellpath (Continued) WG-01 T3 Poly WG-01 Wp4 T1 Geographical Coordinates #1 #2 #3 #4 Mean Sea Level/Global Coordinates: Geographical Coordinates: Target Boundary Point #1 #2 #3 #4 Target Entry Coordinates TVD Northings Eastings (ft) (ft) (ft) 10161.50 10108.00 70° 25' 38.3367" N 70° 25' 46.4069" N 70° 25' 46.6834" N 70° 25' 38.6231 "N 1652.83 N 6007599.00 N 70° 25' 47.5092" N 149° 07' 18.7153" W 149° 07' 19.5707" W 149° 06' 55.4967" W 149° 06' 54.6729" W 569.30 E 607912.00 E 149° 07' 13.5957" W 10161.50 1652.83 N 569.30 E 10161.50 2669.44 N 533.92 E 10161.50 2699.18 N 1386.44 E 10161.50 1682.57 N 1421.81 E Mean Sea Level/GlobalCoordin~es #1 10108,00 6007599.00 N 607912.00 E #2 10108.00 6008615.00 N 607862.00 E #3 10108.00 6008657.00 N 608714.00 E #4 10108.00 6007641.00 N 608764.00 E Geographical Coordinates #1 #2 #3 #4 70° 25' 47.5092" N 149° 07' 13,5957" W 70° 25' 57.5083" N 149° 07' 14.6315" W 70° 25' 57.7997" N 149° 06' 49.6141" W 70° 25' 47.8005" N 149° 06' 48.5817" W 708.03 N 315.24 E 6006650.64 N 607671.56 E 70° 25'38.2166"N 149° 07'21.0512"W 7908.50 7855.00 Mean Sea Level/Global Coordinates: Geographical Coordinates: Alaska State Plane 4 EXPLORATION GB Target Target Shape Type Polygon Geological Point Geological Con~nued... 9 December, 1999 - 13:21 - 11 - DrillQuest 1,05,04c Sperry-Sun Drilling Services Proposal Report for WGWYD YR-01 Staked- WGWYD YR-01 Wp4-3 North Slope Alaska Target Name Targets associated with this wellpath (Continued) WG-01 Wp4 T2 WG-01 Wp4 T3 Mean Sea Level/Global Coordinates: Geographical Coordinates: Mean Sea Level/Global Coordinates: Geographical Coordinates: Target Entry Coordinates TVD Northings Eastings (ft) (ft) (ft) 8975.50 1390.56 N 619.12 E 8922.00 6007337.47 N 607965.59 E 70° 25' 44.9295" N 149° 07' 12.1346" W 10161.50 2149.21 N 956.89 E 10108.00 6008100.90 N 608292.41 E 70° 25' 52.3910" N 149° 07' 02.2214" W Alaska State Plane 4 EXPLORATION GB Target Target Shape Type Point Geological Point Geological 9 December, 1999- 13:21 - 12- DrillQuest 1.05.04c Alaska hared ervices rilling WELL NAME West Gwydyr #1 DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is amfficable to: (only one category per cover sheet) r~ DRILLING PERMIT [~] Permi~D_ oc/)l~rn~pt~tion,P~ ared: ODE:~ Date'/~/,~ ~ Per~t Application Reviewed: SDE~S: ~-- ~. ~ate: Pe~t~p~licafiou ~ub~tted: TA: ~~ ~_~ Date: PRE-RIG WORK Pre-Rig Memo Reviewed: S DE/ES: D ate: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date: SUNDRY NOTICE D Sundry Documentation Prepared: ODE: Date: D Sundry Application Reviewed: SDE/ES: Date: l'~ Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (C. heck all that apply) Abandon Change Approved Program Alter Casing Operation Shutdown Suspend Re-enter Suspended Well Repair Well Time Extension Plugging Perforate Pull Tubing Stimulate Variance Other(Explain): ~.'~ 12:, APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: ........ DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 102799 'CK 10;2799H 100. O0 100. O0 HANDLING INST: S/H TERRIE HUBBLE X4&~8 rile ATrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ::~:~.: .:,,BP.EXPLOBATIQN (ALASKA).,/NC, il :.'::~. '!!!':i5. O:"':i~bX::. 1966'12 :':':i:'!'::'" ~:;i;!i:':!):, ': ?-::.:.' 'AN~HO~AG'E;:':ALASK~Ii: 99519-661 Fi.RsT ~TIOi~A!L.B AN K~F ASH~",ANO ':..::::'.ii ':.'.~: .,~AI~I.IATE:Or '.~::~' :' ::::'.:.. ::: ::::::~ ::..:.~ ~ON~[.:CI~ B~K "':: '::: ['.; i: · : .': ':. ': ,:' 'CEEVE~D OHiO ':,":' ::" ' ::'....: .~:::. , ... . .:'. 412 NO.. H :, .,: ......:,. ::,.,:. ,, :.;.,, CONS~iDii~D "00158195 :' ':' PAY .To:::. The:: ALASKA STATE DEPT OF. REVENUE .;':::O~ ?:: :' :": ::300! ?PDRcUP I '~:~:.~"~.'":: ':~,~'~ .~:;:~ ~":: ':::~:~'?~:~?":' DATE '" I to/2a/,e I I .... "' "°°'°°1 ~:!.:.' {.?~ : .. "::" '"" ~'~¥ALID A~R 1~ DAYS," ' ':' :':" :~::. ',." .. ANCHORAOE AK 99501-3120 .__ . , WELL PERMIT CHECKLIST FIELD & POOL ADMINISTRATION 1. 3. 4. 5. 6. 7. 8. 9. 10. 11. APP-J~ DATE ~ 12. ,~.~ /Z-'//1/' ~"'] 13. COMPANY /47-" WELL NAME ~.~_¢-/~,~/,~¢~¢/ PROGRAM: exp v/'~lev redrll serv wellbore seg ann. disposal para req ~/ INIT CLASS ~ ,./]/"/,:~/'~' ~,:"¢/ ''J ~ GEOL AREA ~__~., .~("~ UNIT# /t¢/.'' ,'~. ON/OFF SHORE ~'~,'~/ i Permit fee attached ......................... Y"' N . Lease number appropriate? (?.-¢~..*//:'4"m :,: re-:CO --.;..,= . , ¢ . - . Unique well name and number Well located in a defined pool .................. 2~/ ~ - ~ . ¢ , ~ . .. ~ . ~, . we, ocated proper dista.c from dri,i.g nit .... Well located proper distance from other wells .......... Su~cient acreage available in drilling unit ............ If deviated, is wellbore plat included ............... ~ N Operator only affected pa~y ................... N Operator has appropriate bond in force ............. ~Y~'~N Permit can be issued without conse~ation order ........ Permit can be issued without administrative approval ...... Gan permit be approved before 15-day wait ........... ENGINEERING DATE 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. mOPEs, do they meet regulation ................ 26. mOPE press rating appropriate; test to ' ._Q-"~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures. ~,... h 31. Data presented on potential overpressure zones-fT-. ?z'-../~--.:'.~.'~ 32. Seismic analysis of shallow gas zones.~L: DATE /,~- 33. · ~' ~.~ 34. ANNULAR DISPOSAL 35. APPR DATE With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... (B) will not contaminate freshwater; or cause drilling waste... to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Seabed condition survey (if off-shore) ............ Y~ N Contact name/phone for weekly progress repods [exploratory only]~,~ N / ~__., Y N ~--~ 2~, , Y N Y N Y N GEOLOGY: ENGINEERING: UIC/Annular ~~.~.. B,,_.E, ,W .~~ ! ~-?.4'~WM~-'''''''''~ DWJ jur~ ~ RNC c:\msoffice\wordian\diana\checklist (rev. 09/27/99) COMMISSION: Comments/Instructions: Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX. .. No special'effort has been made to chronologically organize this category of information. o, WGWYDYR-01.tmp created Mon Apr 3 12:38:56 2000 by CLEANUP Vi. 0 ISL ISL Summary Listing - version 1.01 ISL ISL Date Processed - 3 APR 100 ISL Input File Name - WGWYDYR-01 ISL File 1 - File Header Information Reel Nbr - 1 Tape Nbr - 1 File Nbr - 1 LIS File Nbr - 001 Start - Stop Depth Service Name - LIS Service Sub Name - Origin of Data - File Type - Reel Comments - Tape Comments - : 140.0 - 11010.0 (F) File 1 - Log Header Information LOG HEADER LISTING Log Heading: HIGH DEFINITION INDUCTION LOG Company: BP EXPLORATION (ALASKA) INC. Well: WEST G~£DYR NO.1 Field: PRUDHOE BAY County: NORTH SLOPE State: ALASKA Nation: ~ Location: SURFACE: Field Location: 3509' NSL & 5066' WEL Sec: 4.000000000000000000 Twp: 12N Latitude: Longitude: Permanent Datum: M.S.L. Elevation of Permanent Datum: 0.0 Log Measured From: R.T. Drilling Measured From: R.T. Date: 0/ 0/ 0 Run No: 2.000000000000000000 Depth - Driller: 11030.0 Depth - Logger: 11007.0 Bottom Log Interval: 11000.0 Top Log Interval: 8400.0 Rge: 12E Elevations:- KB: 52.7 DF: 52.7 GL: 24.2 Casing - Driller: 0.0 0.0 0.0 Casing - Logger: 0.0 0.0 0.0 Casing: Weight: 0.00 0.00 0.00 Bit Size: Depth: 0.0 0.0 0.0 Drilling Fluid Type: KCL/POLYMER Density: 10.60 Viscosity: 54.00 Ph: 8.40 Fluid Loss: 4.50 Source of Sample: FLOWLINE Source tlmf/Rms: MEASURED Rm: 0.310 / MEASURED at 70.000 Page 1 -+ RECEIVED APR 04 000 Alaska Oil & Gas Cons. Commission Anchorage Time Circ. Stopped: Time Logger on Bott.: Max. Recorded Temp.: Logging Unit Number: Logging Unit Location: Logging Company Code: Recorded by: Witnessed by: 0.220 at 70.000 0.420 at 70.000 199.0 HL 65 NORTH SLOPE 150.0000000000000000 R. ECK J. SECCOMBE + .... ISL - ISL .... + LOG HEADER LISTING - Page 2 -+ Remarks:- PULLED TIGHT AT 10316', CLOSED TOOL AND RESUMED LOGGING AT 9915'. FULL-WAVE DATA WAS RECORDED FROM 8070-8625. HDIL AFTER VERIFICATION WAS NOT DONE DUE TO LOGGING TO SURFACE LOGS WERE SPLICED AT 8580' SPECTRALOG RAN OVER SELECTED INTERVALS Other Services:- SL Equipment Numbers:- + .... ISL .......... -- ISL .... + File 1 - Channel Listing Mnem NbrSamp NbrEntry DEPT 1 1 BIT 1 1 BVOL 1 1 CAL 1 1 CHT 1 1 CN 1 1 CNC 1 1 CNCF 1 1 CVOL 1 1 ServID Stat InUnit OutUnit SYST 01 ALLO F F SYST 01 ALLO IN IN ZDL 01 ALLO F3 F3 ZDL 01 ALLO IN IN HOIS 01 ALLO LBF LBF CN 01 ALLO PU PU CN 01 ALLO PU PU CN 01 ALLO PU PU ZDL 01 ALLO F3 F3 Start 140.000 -999.250 -999.250 -999.250 -999.250 77.866 -999.250 -999.250 -999.250 Stop 11010.000 9.875 2.659 -999.250 2069.158 -999.250 -999.250 -999.250 1.074 DT 1 GR 1 K 1 KTH 1 M2CX 1 M2R1 1 M2R2 1 M2R3 1 M2R6 1 M2R9 1 M2RX 1 PE 1 PORA 1 PORZ 1 RWAZ 1 SP 1 SPDH 1 TEN 1 TH 1 TTEN 1 U 1 ZDEN 1 1 MAC 01 ALLO US/F US/F 1 DSL 01 ALLO GAPI GAPI 1 DSL 01 ALLO % % 1 DSL 01 ALLO GAPI GAPI 1 HDIL 01 ALLO MMHO M~HO 1 HDIL 01 ALLO OHMM OHMM 1 HDIL 01 ALLO OHMM OHMM 1 HDIL 01 ALLO OHMM OHMM 1 HDIL 01 ALLO OHMM OHMM 1 HDIL 01 ALLO OHMM OHMM 1 HDIL 01 ALLO OH~M OHMM 1 ZDL 01 ALLO B/E B/E 1 MAC 01 ALLO PU PU 1 ZDL 01 ALLO PU PU 1 HDIL ' 01 ALLO OHM/4 OHMM 1 HDIL 01 ALLO MV MV 1 HDIL 01 ALLO MV MV 1 HOIS 01 ALLO LBF LBF 1 DSL 01 ALLO PPM PPM 1 HOIS 01 ALLO LBF LBF 1 DSL 01 ALLO PPM PPM 1 ZDL 01 ALLO G/C3 G/C3 -999 250 31 896 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 329 860 -999 250 6455 109 -999 250 -999 250 File 1 - Comments Listing File does not contain any c Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Thu Feb 24 12:31:43 2000 Reel Header Service name ............. LISTPE Date ..................... 00/02/24 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN CONFIDENTIAL REGEiVED z oooi¢l t- Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 00/02/24 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Exploration MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MM-90231 MARK HANIK JOHN RALL West Gwydyr %1 500292295400 BP Exploration (Alaska), Inc. Sperry Sun 24-FEB-00 MWD RUN 2 AK-MM-90231 MARK HANIK TOM ANGLIN MWD RUN 3 AK-MM-90231 RANDY KRELL TOM ANGLIN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: MWD RUN 4 AK-MM-90231 RANDY KRELL TOM ANGLIN ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MWD RUN 5 AK-MM-90231 J. FOLEY T. ANGLIN 4 12N 12E 3509 5066 52.70 52.70 24.20 MWD RUN 6 AK-MM-90231 JACK FOLEY T. ANGLIN WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.500 20.000 110.0 9.875 10.750 3533.0 9.875 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISED NOTED. . MWD RUN 1 IS DIRECTIONAL AND DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS. 3. MWD RUNS 2-6 ARE DIRECTIONAL, DGR , AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE- 4 (EWR4). 4. DIGITAL AND LOG DATA ARE DEPTH CORRECTED TO THE PDC GR LOG OF 02/16/00 WITH KBE OF 52.7' A.M.S.L. LOG HEADER DATA RETAINS ORIGINAL DRILLER'S DEPTH REFERENCES. . MWD RUNS 1-6 REPRESENT WELL WEST GWYDYR %1 WITH API 50-029-22954-00. TH A TOTAL DEPTH OF ll030'MD / 10513'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 63.0 10997.0 ROP 112.0 11035.0 FET 3520.5 10989.5 RPD 3523.0 10985.0 RPX 3523.0 10985.0 RPS 3523.0 10985.0 RPM 3523.0 10985.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH -- BASELINE DEPTH 63.0 261 286 326 389 391 398 401 403 418 431 450 466 472 552 604 606 660 693 720 797 816 837 852 877 883 914 963 965 967 968 974 980 986 995 1024 1027 1044 1047 1054 1065 1067 1069 1084 1101 1126 1137 1141 1149 1155 1169 1172 1194 1196 1206 1208 1208. 1212. 1217. .5 .5 0 0 0 0 0 0 5 5 5 5 5 5 5 5 0 5 5 0 0 0 0 0 0 0 0 0 0 5 5 5 5 5 0 0 5 0 0 0 5 5 0 5 5 5 0 0 0 5 0 5 5 5 0 5 5 5 GR 61.5 260 0 285 5 325 5 388 5 391 0 398 5 400 0 404 0 418 5 431 0 449 5 466 0 472 0 553 5 604 5 608 0 661.5 695.5 721.5 798.5 817.5 838.0 853.0 878 0 884 0 914 0 962 5 965 0 967 0 968.5 974 5 980 5 986 5 995 5 1024 0 1027 0 1045 5 1047 5 1053 0 1063.0 1068.0 1070.0 1085.0 1102.0 1127.0 1138.5 1142.0 1150 0 1157 0 1170 5 1173 0 1195 5 1197 5 1207 0 1209 0 1210 0 1214 0 1219.5 1221 1230 1241 1257 1270 1279 1306 1341 1346 1350 1352 1360 1401 1412 1425 1475 1482 1503 1529 1532 1534 1546 1547 1575 1585 1592 1597 1609 1616 1651 1676 1680 1688 1692 1733 1749 1752 1784 1792 1883 1901 1947 1948 1961 1970 1977 2063 2136 2259 2278 2330 2342 2398 2414 2441 2570 2574 2577 2599 2653 2655 2660 2737 2750 2757 2795 .0 .5 .0 5 5 0 0 0 0 0 5 5 5 0 0 0 0 0 5 0 0 0 5 .0 .5 .5 .5 .0 .5 .0 .0 .0 .5 .5 .5 .0 5 0 0 5 5 0 5 0 0 0 5 0 0 5 0 5 5 5 0 0 0 .0 0 0 0 5 5 0 5 0 1223.0 1231.5 1242 0 1259 0 1271 0 1279 5 1306 5 1342 5 1346 5 1350 0 1353 5 1360 5 1401 5 1412 0 1425 5 1474.5 1482.5 1503.5 1530.5 1534.0 1537.0 1548.0 1549.5 1577.0 1587.0 1593 5 1600 5 1610 5 1618 0 1653 0 1678 0 1682 5 1689 5 1693 5 1735 5 1751 0 1755 5 1786 0 1794 0 1884 0 1903 0 1949 5 1950 5 1964 0 1972 5 1979 5 2065 0 2137.0 2260.0 2279.5 2331.0 2344.5 2400.5 2416.5 2443.0 2573.0 2577 5 2581 0 2602 5 2656 5 2658 5 2664 5 2740 5 2754 0 2761 0 2799 0 2847.5 2872.5 2952.5 2981.0 2983.0 2987 0 2996 0 3135 0 3196 0 3239 5 3303 0 3414 0 3437 0 3446 5 3455 0 3464 5 3469 0 3524 0 3528 0 3533 5 3536 5 3544 5 3552 0 3554 5 3565 5 3595 5 3615 0 3620 5 3622 0 3624 5 3628 0 3642 0 3652 5 3662 5 3689 5 3703 5 3721 0 3725 5 3776 0 3802 5 3821 0 3839 5 3847 5 3866 5 3885 0 3887 0 3924 0 3975 0 3979 0 3988 0 4008 0 4041 0 4045 0 4055 0 4074 5 4089 0 4099 0 4112 5 4116 5 4122 0 4138.0 4150.0 4152.5 4157.0 4163.0 4173.0 852 5 876 5 955 5 985 0 986 5 990 5 999 5 139 0 2OO 0 3243 0 3305 5 3416 5 3439 5 3448 0 3457.5 3467.0 3471.5 3526.5 3529.5 3534.5 3537 0 3545 0 3552 0 3555 5 3566 5 3597 0 3617 0 3624.0 3625 5 3628 0 3631 5 3645 5 3655 5 3666 0 3692 0 3706 5 3723 0 3728 5 3778 5 3804 5 3822 5 3841 5 3850 5 3869 0 3887 0 3889 5 3925 5 3976 0 3980 0 3989 0 4009.5 4042 5 4044 5 4054 0 4075 5 4090 0 4100 0 4113 5 4117 5 4122 5 4140.5 4152.5 4155.0 4158.5 4166.0 4175.5 4177 4180 4182 4197 4199 4202 4207 4217 4236 4243 4250 4256 4267 4270 4281 4301 4350 4369 4391 4398 4404 4410 4433 4444 4462 4464 4494 4496 4499 4503 4536 4540 4548 4549 4557 4577 4582 4609 4615 4618 4630 4650 4664 4672 4677 4691 4711 4725 4731 4735 4739 4747 4754 4762 4764 4771 4779 4784 4788 4795 4798 4816 4819 4824 4829 4844 4179.5 4182.5 4185.0 4200.0 4201.5 4205.0 4210.0 4219 5 4239 0 4246 0 4252 0 4259 0 4270 0 4273 0 4284 5 4304 0 4353 5 4372.5 4395.5 4401.5 4407.5 4414.5 4437.5 4448.0 4466.0 4468.5 4494.0 4496.0 4499.0 4503.0 4536 0 4540 0 4547 5 4549 0 4557 5 4578 0 4583 5 4608 0 4615 0 4618 0 4632 0 4652 0 4664 5 4672.5 4678.0 4692 0 4711 5 4725 5 4732 0 4735 5 4740 5 4748 0 4755 5 4763.0 4765.5 4772.5 4780.5 4786.5 4789.0 4796 0 4799 0 4817 5 4820 0 4826 0 4831 0 4846 0 4860 5 4864 0 4876 0 4880 0 4883 0 4884 5 4892 5 4904 5 4908 5 4910 5 4920 5 4936 5 4942 5 4999 5 5016 5 5025 0 5038 5 5048 0 5069 5 5074 0 5079 0 5085 5 5096 5 5098 5 5100 5 5119 0 5131 0 5139 5 5152 0 5167 5 5176 0 5184 0 5185 5 5200 0 5205 5 5210 0 5232 0 5243 5 5254 0 5281 0 5285 5 5298 0 5309 5 5323 5 5345 0 5352 5 5361 0 5367 5 5376 0 5381 0 5430 5 5450 5 5499 5 5520 5 5530 5 5538.5 5565.0 5611.5 5645.0 5725.0 5746.0 5763.0 5788.5 5806.0 6025.5 6032.0 4862 0 4865 5 4877 5 4881 5 4884 5 4886 0 4894 0 4906 5 4911 0 4913 0 4924 0 4938 5 4943 0 4998 5 5017 5 5025 5 5039 5 5049 5 5069 5 5074 5 5079 5 5087 0 5097 5 5099 0 5100 5 5119.5 5132.0 5140 5 5154 0 5167 5 5176 5 5185 0 5186 5 5201 0 5205 0 5210 0 5232 0 5244 0 5255 5 5280.5 5285 0 5297 5 5309 5 5323 5 5344 5 5352 0 5360 0 5366 5 5375 5 5380 5 5430 0 5451.5 5500.0 5522.0 5532.0 5540.5 5566.0 5612.0 5645.5 5725 0 5745 5 5760 5 5787 0 5805 5 6026 5 6032 5 6033 6053 6124 6162 6167 6201 6305 6310 6315 6325 6327 6341 6349 6373 6380 6429 6450 6459 6468 6476 6485 6489 6493 6501 6518 6568 6571 6587 6599 6638 6650 6655 6690 6716 6745 6746 6750 6760 6771 6793 6816 6818 6827 6844 6858 6873 6875 6889 6896 6897 6903 6914 6934 6944 6954 6966 6973 6977 6994 6996 7009 7013 7016 7019. 7026. 7077. 6035 0 6055 0 6125 0 6163 5 6168 5 6203 0 6308 0 6313 5 6318 5 6327 5 6329 5 6342 5 6350 0 6374 5 6381 5 6431 0 6449.5 6458.5 6466 0 6474 0 6485 5 6488 5 6491 5 6500 0 6516 0 6566 5 6569 0 6584.5 6596.0 6635.5 6647.0 6652.0 6689 0 6714 5 6742 0 6744 5 6748 0 6758 5 6769 5 6790 5 6813 0 6815 5 6824 0 6841.0 6854 0 6870 0 6872 5 6884 5 6891 5 6893 0 6898 5 6910 0 6930 0 6941 0 6951 0 6962 5 6969.5 6974.0 6990 5 6992 5 7006 0 7010 5 7013 0 7016 0 7021 5 7073 0 7080 7093 7105 7122 7137 7139 7147 7162 7180 7183 7215 7233 7251 7256 7278 7283 7286 7299 7308 7319 7331 7361 7366 7382 7395 7398 7400 7413 7419 7429 7439 7447 7450 7453 7456 7468 7484 7487 7488 7495 7505 7512 7516 7521 7523 7525 7528 7537 7544 7551 7553 7556 7568 7572 7574 7580 7586 7589 7594 7599 7606 7611 7614 7620 7623 7630 7076 5 7088 5 7100 5 7115 5 7131 5 7133 0 7142 5 7157 5 7176 0 7178 5 7212 0 7230 0 7248 5 7254 5 7276 0 7281 5 7285 0 7297 5 7307 0 7316 5 7329 0 7360.0 7364.5 7381.0 7394.5 397.5 399.5 413 0 419 5 429 5 439 5 447 5 449 5 453 0 455 5 467 0 482 5 486 0 487 5 494 5 505 0 512 0 515 5 521 0 522 5 525 5 528 0 536 5 544 0 551 0 553.0 557.0 569.5 572.5 575 0 580 5 587 0 589 5 594 5 599 0 606 5 611 0 614 5 621 0 623 5 630 5 7632 0 7633 5 7640 0 7652 0 7655 0 7673 5 7690 0 7692 5 7694 0 7704 0 7716 5 7722 5 7742 0 7758 0 7764 5 7767 0 7769 0 7770 5 7774 5 7781 0 7797 0 7826 5 7830 0 7851 0 7858 0 7862 0 7868 0 7879 0 7893 0 7895 5 7905 0 7910 0 7912 0 7918 0 7919 5 7923 0 7997 0 8030 0 8044 0 8060 5 8063 0 8065 0 8079 0 8110 0 8123 0 8126 0 8150 5 8152 5 8155 0 8163 0 8185 0 8188 0 8191 0 8198 5 8201 5 8205 0 8218 0 8221 0 8230 5 8235 0 8238 0 8250 5 8264 0 8266 5 8268 0 8273 5 7632 5 7634 5 7640 0 7651 0 7655 0 7675 5 7692 5 7695.0 7696 0 7706 0 7718 5 7724 5 7744 0 7760 0 7767 0 7769 5 7771 5 7773 0 7777 0 7784 5 7799 5 7829 0 7832 0 7852 5 7860 5 7865 0 7870 5 7882 0 7895 0 7896 5 7906 5 7911 5 7913 5 7920 5 7922 0 7925 5 7997 0 8030 0 8045 0 8061 5 8064 0 8066 5 8080 0 8111 5 8122 5 8126 0 8151 5 8153 5 8156 0 8163.5 8185.5 8188.5 8191.5 8198 0 8202 0 8205 5 8218 5 8221 5 8231 0 8235 5 8238 5 8251 0 8265 0 8267 0 8268 5 8273 5 8278.0 8285.5 8288.5 8296 0 8297 0 8300 5 8314 5 8318 0 8322 5 8324.5 8342.0 8347.0 8350.5 8360 5 8369 0 8377 5 8388 5 8407 5 8409 0 8414 0 8421 0 8432 5 8434 0 8435 5 8454 5 8479 5 8484 0 8487.5 8490 5 8502 0 8517 0 8523 0 8535 5 8551 0 8555.0 8576 0 8587 5 8591 5 8597 5 8609 5 8615 0 8628 5 8633 0 8665 0 8673 0 8678 0 8682 0 8721 0 8782 0 8789 0 8804 0 8824 0 8851 5 9067 0 9074 0 9075 0 9111 5 9115 5 9123 0 9275 5 9279 0 9309 5 9317 0 9322 5 9427 5 9446 0 8277 5 8286 0 8289 0 8295 5 8297 0 8300 5 8314 5 8318.5 8322.5 8324.5 8342 5 8346 0 8349 5 8360 0 8368 5 8377 0 8387 5 8406 5 8408 0 8413 0 8419 5 8431 5 8433 5 8435 5 8452.0 8475.0 8480.0 8483.0 8486.0 8498.5 8513.5 8519.5 8532.0 8547.0 8551.0 8572.0 8583.5 8587 0 8593 0 8605 0 8610 5 8624 5 8629 0 8662 0 8670 5 8675 5 8680 5 8717 0 8779 5 8786 5 8801 5 8822 0 8849 5 9066 0 9072 5 9074 5 9112 5 9117 0 9123 5 9274 0 9277 0 9308 5 9317 5 9322.5 9426.5 9446.0 9451.5 9467.5 9468.5 9494.5 9530 5 9651 0 9674 5 9693 5 9707 0 9717 0 9750 0 9764 0 9792 5 9827 5 10205 0 10230 5 10234 5 10242 0 10249 0 10264 0 10267 5 10271 0 10335 5 10391 5 10459 0 10467 0 10540 5 10547 5 10605 0 10609 5 10639 5 10640 5 10644 0 10652 5 10661 5 10663 5 10666 0 10673 0 10675 5 10677 0 10679 0 10681 5 10686 0 10697 5 10719 5 10724 5 10728 0 10733 0 10747 5 10753 5 10763 0 10767 0 10773 0 10775 0 10778 5 10781 0 10784 0 10791 5 10793 0 10794 5 10797 5 10800 0 10801.0 10802.5 10805.0 10807.5 9451.5 9467.5 9469.0 9494.5 9530 5 9651 5 9675 0 9694 0 9707 0 9717 0 9750 0 9764.5 9792.5 9827.5 10205.0 10230.5 10234.5 10242.0 10248.0 10263.5 10267.5 10271.0 10336.5 10393.0 10458.5 10466.0 10539.5 10546.5 10604.0 10608.5 10637.5 10639.0 10642.5 10651.0 10659.5 10661.5 10664.5 10671.0 10673.5 10675.0 10677.0 10679.5 10683.0 10693.5 10716.5 10720.5 10724.0 10731.0 10745 0 10751 0 10760 0 10764 0 10770 5 10772 0 10775.5 10778 0 10781 5 10787 0 10788 0 10789 5 10792 5 10796.0 10797.0 10798.5 10800.5 10803.5 10811 5 10813 10816 10818 10821 10826 10832 10844 10851 10884 10897 10904 10912 11035 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ # REMARKS: 10808.5 10810.0 10813.0 10815.5 10817.5 10823.0 10829.0 10840.5 10847.5 10881.0 10893.0 10900.5 10907.5 11030.5 BIT RUN NO MERGE TOP 100 110 0 200 3548 0 300 6485 0 400 7686 0 500 8471 0 600 8780 0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 3548 0 6485 0 7686 0 8471 0 8780 0 11030 0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 FET MWD HOUR 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 RPS MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPD MWD OHMM 4 1 68 28 8 Name Service Unit Min Max Mean Nsam DEPT FT 63 11035 5549 21945 ROP MWD FT/H 0 9955.17 94.3034 21836 GR MWD API 9.28 448.47 87.3337 21869 FET MWD HOUR 0.1492 60.2159 2.00927 14939 RPX MWD OHMM 0.31 310.2 2.65289 14925 RPS MWD OHMM 0.34 896.43 3.3049 14925 RPM MWD OHMM 0.33 1748.17 3.7569 14925 RPD MWD OHMM 0.29 2000 5.33356 14925 First Reading 63 112 63 3520.5 3523 3523 3523 3523 Last Reading 11035 11035 10997 10989.5 10985 10985 10985 10985 First Reading For Entire File .......... 63 Last Reading For Entire File ........... 11035 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 61.5 RO? 110.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): STOP DEPTH 3503.5 3548.0 30-JAN-00 Insite 5.4 Memory 3548.0 .1 1.1 TOOL NUMBER PB01389CGV8 13.500 110.0 Water Based 9.60 180.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE {MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 9.2 600 7.2 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 1 FT/H 4 1 68 4 2 GR MWD 1 API 4 1 68 8 3 .0 87.0 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 61.5 3548 1804.75 6974 ROP MWD 1 FT/H 0 496.32 118.544 6876 GR MWD 1 API 16.94 122.27 63.5328 6885 First Reading 61.5 110.5 61.5 Last Reading 3548 3548 3503.5 First Reading For Entire File .......... 61.5 Last Reading For Entire File ........... 3548 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 3504.0 RPM 3523.0 RPS 3523.0 RPD 3523.0 FET 3523.0 RPX 3523.0 ROP 3549.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 6452 0 6444 5 6444 5 6444 5 6444 5 6444 5 6485 0 04-FEB-00 Insite 5.4 Memory 6485.0 .1 10.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER PB01422HWGVR6 PB01422HWGVR6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 9.875 3533.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL POLYME 10.20 48.0 .0 14800 10.0 .240 .140 .160 .420 64.0 108.0 64.0 64.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD 2 FT/H 4 1 68 GR MWD 2 API 4 1 68 RPX MWD 2 OHMM 4 1 68 RPS MWD 2 OHMM 4 1 68 RPM MWD 2 OHMM 4 1 68 RPD MWD 2 OHMM 4 1 68 FET MWD 2 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 3504 6485 ROP MWD 2 FT/H 2.12 904.69 GR MWD 2 API 9.28 128.2 RPX MWD 2 OHMM 0.41 310.2 RPS MWD 2 OHMM 0.48 896.43 RPM MWD 2 OHMM 0.57 1748.17 RPD MWD 2 OHMM 0.63 2000 FET MWD 2 HOUR 0.1492 60.2159 Mean 4994.5 126.215 73.8332 2.83433 3.35217 3.88368 8.00784 1.23581 Nsam 5963 5861 5897 5844' 5844 5844 5844 5844 First Reading 3504 3549.5 3504 3523 3523 3523 3523 3523 Last Reading 6485 6485 6452 6444.5 6444.5 6444.5 6444.5 6444.5 First Reading For Entire File .......... 3504 Last Reading For Entire File ........... 6485 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET RPD RPM RPS RPX ' GR ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 6445 0 6445 0 6445 0 6445 0 6445 0 6452 5 6487 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 7641 5 7641 5 7641 5 7641 5 7641 5 7649 0 7686 0 07-FEB-00 Insite 5.4 Memory 7686.0 10.6 35.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER PB01422HWGVR6 PB01422HWGVR6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 3533.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL POLY 10.40 43.0 8.5 15000 5.6 .280 .150 .200 .420 65.0 126.0 62.0 62.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD 3 FT/H 4 1 68 GR MWD 3 API 4 1 68 RPX MWD 3 OHMM 4 1 68 RPS MWD 3 OHMM 4 1 68 RPM MWD 3 OHMM 4 1 68 RPD MWD 3 OHMM 4 1 68 FET MWD 3 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 6445 7686 ROP MWD 3 FT/H 0 200.79 GR MWD 3 API 51.7 446.06 RPX MWD 3 OHMM 0.9 7.17 RPS MWD 3 OHMM 0.96 7.44 RPM MWD 3 OHMM 0.96 18.58 RPD MWD 3 OHMM 0.99 7.75 FET MWD 3 HOUR 0.4934 26.2886 Mean 7065.5 42.0354 133.549 2.08414 2.28079 2.32966 2.36064 2.78534 Nsam 2483 2399 2394 2394 2394 2394 2394 2394 First Reading 6445 6487 6452.5 6445 6445 6445 6445 6445 Last Reading 7686 7686 7649 7641.5 7641.5 7641.5 7641.5 7641.5 First Reading For Entire File .......... 6445 Last Reading For Entire File ........... 7686 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET 7642.0 RPS 7642.0 RPX 7642.0 RPM 7642.0 RPD 7642.0 GR 7649.5 ROP 7686.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8432.0 843'2 0 8432 0 8432 0 8432 0 8439 5 8471 0 09-FEB-00 Insite 5.4 Memory 8471.0 31.9 34.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER PB01422HWGVR6 PB01422HWGVR6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 3533.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL POLY 10.40 44.0 9.5 15400 4.5 .360 .200 .200 .480 68.0 122.0 68.0 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 API 4 1 68 4 2 RPX MWD 4 OHMM 4 1 68 8 3 RPS MWD 4 OHMM 4 1 68 12 4 RPM MWD 4 OHMM 4 1 68 16 5 RPD MWD 4 OHMM 4 1 68 20 6 FET MWD 4 HOUR 4 i 68 24 7 ROP MWD 4 FT/H 4 1 68 28 8 Name Service Unit DEPT FT GR MWD 4 API RPX MWD 4 OHMM RPS MWD 4 OHMM RPM MWD 4 OHMM RPD MWD 4 OHMM FET MWD 4 HOUR ROP MWD 4 FT/H Min Max Mean Nsam 7642 8471 8056.5 1659 42.75 241.14 113.009 1581 1.21 8.03 2.57796 1581 1.29 9.96 2.90431 1581 1.33 10.64 2.94192 1581 1.33 9.24 2.96252 1581 0.5842 21.3775 2.77746 1581 0 143.38 37.8634 1570 First Reading 7642 7649.5 7642 7642 7642 7642 7642 7686.5 Last Reading 8471 8439.5 8432 8432 8432 8432 8432 8471 First Reading For Entire File .......... 7642 Last Reading For Entire File ........... 8471 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET RPD RPM RPS RPX GR ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 8432 5 8432 5 8432 5 8432 5 8432 5 8440 0 8472 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: STOP DEPTH 8735 5 8735 5 8735 5 8735 5 8735 5 8743 0 8780 0 10-FEB-00 Insite 5.4 Memory 8780.0 31.4 33.8 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL NUMBER PB01422HWGVR6 PB01422HWGVR6 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 9.875 3533.0 REMARKS: Data Format Specification Record Data Record Type .................. 0 Water Based 10.50 62.0 9.0 14700 4.0 .240 .000 .160 .320 75.0 122.0 75.0 75.0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name DEPT ROP GR RPX RPS RPM RPD FET Service Order Units Size Nsam Rep FT 4 1 68 MWD 5 FT/H 4 1 68 MWD 5 API 4 1 68 MWD 5 OHMM 4 1 68 MWD 5 OHMM 4 1 68 MWD 5 OHMM 4 1 68 MWD 5 OHMM 4 1 68 MWD 5 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 8432.5 8780 ROP MWD 5 FT/H 0 167.6 GR MWD 5 API 38.01 128.67 RPX MWD 5 OHMM 1.47 6.24 RPS MWD 5 OHMM 1.59 6.66 RPM MWD 5 OHMM 1.59 6.88 RPD MWD 5 OHMM 1.61 6.45 FET MWD 5 HOUR 0.4273 21.6232 Mean 8606.25 70.5214 96.1418 3.46684 3.9444 4.00081 4.0798 4.00212 Nsam 696' 617 607 607 607 607 607 607 First Reading 8432.5 8472 8440 8432.5 8432.5 8432.5 8432.5 8432.5 Last Reading 8780 8780 8743 8735.5 8735.5 8735.5 8735.5 8735.5 First Reading For Entire File .......... 8432.5 Last Reading For Entire File ........... 8780 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH RPX 8736.0 RPS 8736.0 RPM 8736.0 RPD 8736.0 FET 8736.0 GR 8743.5 ROP 8781.5 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 STOP DEPTH 10986 0 10986 0 10986 0 10986 0 10986 0 10993 5 11030 5 ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet 14-FEB-00 Insite 5.4 Memory 11030.0 16.8 31.9 TOOL NUMBER PB01422HWGVR6 PB01422HWGVR6 9.875 3533.0 Water Based 10.50 51.0 9.2 14300 4.2 .290 .000 .220 .390 82,0 197.0 82.0 82.0 Name DEPT ROP GR RPX RPS RPM RPD FET Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Service Order Units Size Nsam FT 4 1 MWD 6 FT/H 4 1 MWD 6 API 4 1 MWD 6 OHMM 4 1 MWD 6 OHMM 4 1 MWD 6 OHMM 4 1 MWD 6 OHMM 4 1 MWD 6 HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Service Unit Min Max DEPT FT 8736 11030.5 ROP MWD 6 FT/H 0 9955.17 GR MWD 6 API 24.99 448.47 RPX MWD 6 OHMM 0.31 23.54 RPS MWD 6 OHMM 0.34 216.87 RPM MWD 6 OHMM 0.33 371.72 RPD MWD 6 OHMM 0.29 309.93 FET MWD 6 HOUR 0.415 37.8386 Mean Nsam 9883.25 4590 67.2791 4499 106.615 4501 2.63614 4501 3.84229 4501 4.60426 4501 4.44327 4501 1.99045 4501 First Last Reading Reading 8736 11030.5 8781.5 11030.5 8743.5 10993.5 8736 10986 8736 10986 8736 10986 8736 10986 8736 10986 First Reading For Entire File .......... 8736 Last Reading For Entire File ........... 11030.5 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 00/02/24 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 00/02/24 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File