Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
195-182
WELL HISTORY FILE COVER PAGE XHVZS This page identifies oversize material and digital information available for this individual Well History file and weather or not it is available in the LaserFiche file. Please insure that it remains as the first page in this file. I ¿¡) / p- Well History File # Digital Data Added to LaserFiche File 0 CD's - # - 0 DVD's - # - 0 Diskettes - # 0 Yes 0 No 0 Yes 0 No 0 Yes 0 No Oversized Material Added to LaserFiche File 0 Maps # - 0 Mud Logs # - 0 Other # - 0 Yes 0 No 0 Yes 0 No 0 Yes 0 No General Notes or Comments about this file. If any of the information listed above is not available in the LaserFiche file you may contact the Alaska Oil & Gas Conservation Commission to request copies. Please call Robin Deason at (907) 793-1225 if you have any questions or information requests regarding this file. 01-17B Pre-rig Work • Maunder, Thomas E (DOA) Page 1 of 3 From: Maunder, Thomas E (DOA) Sent: Tuesday, February 19, 2008 8:14 AM To: 'Peltier, Travis M' Cc: Hobbs, Greg S (ANC) Subject: RE: 01-17B {204 Pre-rig Work l~'S ~~~ Travis, You and your counterparts have more information as to when is best to severe the pipe. Good luck with the work. Tom Maunder, PE ._.. AOGCC From: Peltier, Travis M [mailto:Travis.Peltier@bp.com] Sent: Tuesday, February 19, 2008 7:48 AM To: Maunder, Thomas E (DOA) ~4J~~~, FED 20~~j Cc: Hobbs, Greg S (ANC) Subject: RE: 01-17B (204~Pre-rig Work Tom, ~`~_. I recently had a discussion with some of my RWO counterparts, and they discussed the need to having apre-rig jet cut performed pre-rig so that we can better monitor our annuli for pressure and circulate in our killweight fluids before operations begin. I am looking to get permission to change our pre-rig work operations back to the original plan that was filed with the Sundry. Thanks for the help. -T Pre-rig~rep work: (PropOSed~ S 1 Drift tubing for caliper survey and tubing cut to 8900' MD. Caliper tubing from surface to 8900' MD. Set Liner Top Test Plug (LTTP) at 8832' MD on 4-1/2" KB Packer. Dump 10' sluggits on top of plug. E 2 Jet cut 5 '/s" tubing @8688' MD (Ref original completion tubing tally}. Jet cut desired to be in the middle of the full joint between SBR and upper Camco nipple. F 3 Circulate well with ~9.8 ppg NaCL brine and cap with diesel thru the cut. M{TOA to 2000 psi. Bleed WHPs to 4 psi. Establish injection pressures @ 1 bpm and 2bpm for scab liner cement design. No CMIT required due to PC leak. O 4 Set a BPV in the tubing hanger. O 5 Remove the weilhouse & flow line. Level the pad as needed for the rig. Proposed Procedure: 1. MIRU Nabors 2ES. ND tree. NU and test BOPE to 250 psi low, 3500 psi high. Circulate out freeze protection fluid and circulate well to clean 9.8 pgg brine. 2. Pull and LD 5 112" tubing string. 2/19/2008 O l -17B Pre-rig Work ~ Page 2 of 3 • Pre-Rig Work Request: (Current) S 1 Drift tubing for caliper survey and tubing cut to 8900' MD. Caliper tubing from surface to 8900' MD. Set Liner Top Test Plug (LTTP) at 8832' MD on 4-1l2" KB Packer. Dump 10' siuggits on top of plug. O 4 Set a BPV in the tubing hanger. O 5 Remove the weilhouse & flow line. Level the pad as needed for the rig. Proposed Procedure: 1. MlRU Nabors 2ES. ND tree. NU and test BOPE to 250 psi low, 3500 psi high. Circulate out freeze protection fluid and circulate well to clean 9.8 pgg brine. 2. MlRU SLB SWS, jet cut 5-1/2" tubing at 8688' MD (Ref original completion tubing tally). Jet cut desired to be in the middle of the full joint between SBR and upper Camco nipple. Circulate well with ~9.8 ppg NaCL brine thru the cut. Establish injection pressures @ 1bpm and 2bpm for scab liner cement design. 3. Put! and LD 51/2" tubing string.... From: Maunder, Thomas E (DOA) [maiito:tom.maunder@alaska.gov] Sent: Tuesday, February 05, 2008 1:18 PM To: Peltier, Travis M Cc: Hobbs, Greg S (ANC) Subject: RE: 01-17A (195-182) and 01-176 (204-112) Pre-rig Work Travis, Thanks for the update. I do not see any issue moving the cut to be done with the rig aver the well. Nothing further is needed. I will place a copy of this message in the well files. Please include the permit to drill numbers in the message line. Also note, the according to the Convention employed at the Commission, until the window is milled all work is considered to occur in 01-17A. Call or message with any questions. Tom Maunder, PE AOGCC From: Peltier, Travis M [mailto:Travis.Peltier@bp.com] Sent: Tuesday, February 05, 2008 12:10 PM To: Maunder, Thomas E (DOA) Cc: Hobbs, Greg S (ANC) Subject: 01-17B Pre-rig Work Tom, Upon further review of the 01-17B RWO, we cannot do a pre-rig je# cut as set out in the original application without violating our two barriers policy. 1 am looking for approval to change my order of operations to those listed below. I moved the jet cut to a rig work jet cut, and will perform the same testing as would have been done in pre- rig work. Thanks. 2!19/2008 01-17B Pre-rig Work • -Travis Peltier ADW Drilling Engineer (907)564-4511 Pre-rig prep work: {CURRENT Page 3 of 3 S 1 Drift tubing for caliper survey and tubing cut to 8900' MD. Caliper tubing from surface to 8900' MD. Set Liner Top Test Plug (LTTP} at 8832' MD on 4-112" KB Packer. Dump 10' sluggits on top of plug. E 2 Jet cut 5-%" tubing @8688' MD (Ref original completion tubing tally). Jet cut desired to be in the middle of the full joint between SBR and upper Cameo nipple. F 3 Circulate well with ~9.8 ppg NaCL brine and cap with diesel thru the cut. MITOA to 2000 psi. Bleed WHPs to 0 psi. Establish injection pressures @ 1 bpm and 2bpm #or scab liner cement design. No CMIT required due to PC leak. O 4 Set a BPV in the tubing hanger. O 5 Remove the wellhouse i~ flow line. Level the pad as needed for the rig. Proposed Procedure: 1. MIRU Nabors 2ES. ND tree. NU and test ROPE to 250 psi low, 3500 psi high. Circulate out freeze protection fluid and circulate well to clean 9.8 pgg brine. 2. Pull and LD 5 1/2" tubing string. Pre-Rig Work Request: (PROPOSED) S 1 Drift tubing for caliper survey and tubing cut to 8900' MD. Caliper tubing from surface to 8900' MD. Set Liner Top Test Plug (LTTP} at 8832' MD on 4-1/2° KB Packer. Dump 10' sluggits on top of plug. O 4 Set a BPV in the tubing hanger. O 5 Remove the wellhouse & flow line. Level the pad as needed for the rig. Proposed Procedure: 1. MIRU Nabors 2ES. ND tree. NU and test BOPE to 250 psi low, 3500 psi high. Circulate out freeze protection fluid and circulate well to clean 9.8 pgg brine. 2. MIRU SLB SWS, jet cut 5-1/2" tubing at 8688' MD (Ref original completion tubing tally}. Jet cut desired to be in the middle of the full joint between SBR and upper Cameo nipple. Circulate well with ~9.8 ppg NaCL brine thru the cut. Establish injection pressures @ lbpm and 2bpm for scab liner cement design. 3. Pull and LD 5 1/2p tubing string.... 2/19/2008 -, STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG No. of Completions 1a. Well Status: D Oil D Gas D Plugged II Abandoned D Suspended D WAG 20AAC25.105 20AAC25.110 0 GINJ D WINJ D WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 191' SNL, 646' EWL, SEC. 08, T10N, R15E, UM Top of Productive Horizon: 1005' NSL, 918' WEL, SEC. 06, T10N, R15E, UM Total Depth: 1914' NSL, 1407' WEL, SEC. 06, T10N, R15E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 697962 y- 5940712 Zone- ASP4 TPI: x- 696363 y- 5941867 Zone- ASP4 Total Depth: x- 695847 y- 5942764 Zone- ASP4 18. Directional Survey 21. Logs Run: MWD, GR, TDT-P DYes II No Zero Other 5. Date Comp., Susp., or Aband. 1/18/2004 6. Date Spudded 01/14/1996 7. Date T.D. Reached 01/18/1996 8. KB Elevation (ft): KBE = 73' 9. Plug Back Depth (MD+ TVD) 10331 + 9054 10. Total Depth (MD+TVD) 10345 + 9055 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL ...,a~;t.~. 20" 13-318" 9-518" 2-7/8" CASING, liNER AND CEMENTING RECORD . '~WT~-~¡g;;: J~':G~~~=~~=~~~=~ 94#' 'H-40" Surfa~' 119' 'S~rface ' 119' . 72# N-80 Surface 2704' Surface 2704' 47# N-80 I RS & SM-95 Surface 9416' Surface 8908' 6.4# L-80 9060' 10345' 8604" 9055' 22. 23. Perforations oRen to Production (MD + TVD of To,e and Bottom Interval, Size and Number; if none, state' none"): None MD TVD MD 1b. Well Class: II Development 0 Exploratory 0 Stratigraphic Test 0 Service 12. Permit to Drill Number 195-182/ 304-006 13. API Number ,/ 50- 029-20289-01-00 14. Well Name and Number: / PBU 01-17A 15. Field 1 Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 028329 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) ~-i'~i~;;Y~;:":'~~~-'f~,~~~: ". 30" 250 sx Arcticset 17-1/2" 5800 sx Permafrost II 12-1/4" 960 sx Class 'G' 3-314" 115 sx LARC (Cut & Pulled) .:;~~;:;~~~:;;1i:"";:rûäG--;iftê~Bö~"::~: ,:.'c ... SIZE DEPTH SET (MD) 5-1/2", 17#, N-80 x 8896' 4-1/2", 12.6#, N-80 ~ffiJ~~~:t~~¡;~t~E~:~~~r~~~~~§~EèžiEJ";Ç.:. : . ,','- DEPTH INTERVAL (MD) AMQUNT & KIND OF MATERIAL USED ~ 9100' Set CIBP ,/ /' w.~()~ 8896' 2 Stage P&A, 8 Bbls Class 'G', then 15 Bbls Class 'G' ..t\;t '~l~~)';.:, TVD PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-Bel GAs-McF WATER-BBl GAs-McF WATER-BBl .,. . PACKER SET (MD) 8774' 26. Date First Production: Not on Production Date of Test Hours Tested PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 24-HoUR RATE 27. Brief description of lithology, porosity, fractures, apparent~~;: ~~T~resence of oil, gas or wate¡~~J~c~ ~~L;is~eet, if necessary). Submit core chips; if none, state "none"'v1AR 2 3 200 OIL-Bel None Form 1 0-407 Revised 12/2003 OR\G\NAL CONTINUED ON REVERSE SIDE CHOKE SIZE I GAS-Oil RATIO Oil GRAVITY-API (CORR) lI.1:.1,',~';:¡ f\ . :~" ~Q'H r,., 'í,'i'~'nr'¡p' -- BFL MAIl 2 ' ~\/ 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 8998' 8550' None Shublik 9034' 8582' Sadlerochit 9119' 8655' "':;r '-" '. , '\í..,..C..~ ! (~~ . , ~'ni \AAR 2 3 200 ¡:L~'o;¡,r¡;:~G'::':"" (',"""1(;' !hv'~ "'.~ :' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed TerrieHubble ~,~ Title Technical Assistant Date 03"f)..-CYDl.{ PBU01-17A 195-182 304-006 Prepared By NameiNumber: Terrie Hubble, 564-4628 Well Number Permit No.1 Approval No. Drilling Engineer: Mary Endacott, 564-4388 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEMS: ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced. showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None", ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 01-17B Prudhoe Bay Unit 50-029-20289-02-00 204-012 Accept: Spud: Release: Ri: PRE-RIG WORK 01/15/04 RAN 2.2" CENT., AND SB TO 8898' SLM. RECOVERED TAR LIKE SUBSTANCE. RAN 2.2" CENT., AND 1-3/4" PUMP BAILER. DRIFTED THRU 8898' SLM. TO 9952' SLM. (DRIFTED THRU 8898' SLM- 9100' SLM. SEVERAL TIMES, TO CLEAR). SECURE WELL. 01/17/04 T/I/O= 010. PUMP 5BBL METHANOL SPEAR, 280 BBLS OF 1% KCL FOLLOWED BY 65 BBLS OF 60/40 METHANOL TO FREEZE PROTECT THE TBG. FINAL WHP; T/I/O= 01010. 01118/04 ~ SET HES CIBP IN 2-7/8" LINER AT 9100', PUNCH TUBING AT 9038-9040', STRING SHOT, TIED INTO CBL 17-JULY-03, RIH WITH 2-7/8" CHEM CUTTER TAGGING AT 8859', UNABLE TO REACH CUT DEPTH, POOH, CENTRALIZER ON CHEM CUTTER INCORRECT SIZE, RDMO, RETURN IN AM WITH NEW TOOL STRING. 01/19/04 CHEM CUT 2 718" LINER AT 9060', DEPTH REFERENCED TO SLB CBL LOG DATED 17-JUL Y- 2003. TAG CIBP AT 9100'. INLINE CENTRALIZER ABOVE ANCHORS, GEMCO ON 1 11/16" CHEM TUBE AND BOTTOM CENTRALIZER BELOW SEVERING HEAD. TWO 1 11/16" WT BARS ABOVE CHC ASSEMBLY. 01/20/04 RIH WITH BAKER 4" GS. SET DOWN AND LATCH LINER TOP AT 8830' CTM. LINER RELEASED AFTER 12 JAR LICKS. REPEAT LATCH AND RELEASE TO ENSURE FREE. POOH. FREEZE PROTECT IN PLACE AND ADDED 20 BBLS 60/40 WHILE POOH. LEFT WELL SHUT IN. JOB COMPLETE. BP Operations Summary Report Page 1 .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 01-17 01-17 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 1/14/2004 Rig Release: 2/9/2004 Rig Number: N1 Spud Date: 3/13/1978 End: Date From - To Hours Task Code NPT Phase Description of Operations 1/23/2004 15:30 - 17:30 2.00 MOB P PRE Rig released from 05-41A @ 15:50Hrs on 01/23/2004. Secure & hang BOP stack. SIB injector. 17:30 - 23:30 6.00 MOB N WAIT PRE W. O. -44F weather to RDMO. 23:30 - 00:00 0.50 MOB N WAIT PRE Temperature at 23:53 is -38 degrees F. Will monitor temperature for 1 hour prior to lower wind walls. 1/24/2004 00:00 - 01:30 1.50 MOB N WAIT PRE Monitor temperature. Temperature dropped to -41 degrees F. Continue to service injector. 01 :30 - 02:30 1.00 MOB N WAIT PRE Temperature -38 degrees F. 02:30 - 02:40 0.17 MOB P PRE PJSM for removing goose neck from injector and racking injector in box. 02:40 - 06:00 3.33 MOB P PRE Remove goose neck and stand injector in box. Prepare to move rig off well and lower wind walls. R/U tarps & warm hydraulics. 06:00 - 06:15 0.25 MOB P PRE PJSM for moving rig off well. 06:15 - 07:00 0.75 MOB P PRE Jack-up, pull rig off well & set down. Clean up location & conduct post operations pad inspection. 07:00 - 08:00 1.00 MOB P PRE Install tilt rams. 08:00 - 08:15 0.25 MOB P PRE PJSM for for lowering windwalls. 08:15 - 09:30 1.25 MOB P PRE Unpin & lower wind walls. 09:30 - 09:45 0.25 MOB P PRE PJSM for lowering mast. 09:45 -10:15 0.50 MOB P PRE Scope down & lower mast. 10:15 -11:30 1.25 MOB P PRE PJSM. Jack-up rig & move rig down to pad entrance. 11 :30 - 11 :45 0.25 MOB P PRE Held pre-move safety meeting with crew, security, tool services & CPS. Review route, power line, and flow line crossings. CPS measured rig height. Measurement matches placard. 11 :45 - 14:30 2.75 MOB P PRE Move rig from DS#O5 to D5#01. Line up to 01-17 well & set down. 14:30 - 15:00 0.50 MOB P PRE Conduct pre-operations pad inspection with DSO. Install dikes around tree & place rig mats in front of well. 15:00 - 00:00 9.00 MOB N WAIT PRE WO wind to subside prior to raising windwalls. Winds @ 18mph steady with 25mph gusts. Meanwhile repair valves in pit room, inspect derrick & hold pre-operations safety meeting. 1/25/2004 00:00 - 06:00 6.00 MOB N WAIT PRE Wait on wind to stabilize below 20 mph. Wind speed 15 mph gusting to 25 mph. 06:00 - 07:00 1.00 MOB N WAIT PRE Wind stabilize below 20mph. Prep to raise mast. 07:00 - 07:15 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for raising mast. 07:15 - 08:30 1.25 RIGU P PRE Raise mast. Wind P/U above 20mph. Decide not to raise windwalls. Ajacent DS & ODS wells are far apart from 01-17A- thus will move rig onto well, N/U BOPE while waiting on winds to calm down prior to raising the windwalls. 08:30 - 08:45 0.25 MOB P PRE PJSM for backing rig over well. Review rig back over well procedure, hazards & mitigation. 08:45 - 11 :30 2.75 MOB P PRE Prep to move rig over well. Jack up rig. Remove tree cap, companion valve on tree flowcross & secure cellar. Hang BOP stack on blocks. 11:30-12:30 1.00 MOB P PRE Back rig over well & set down. Wind stabilize below 20mph. 12:30 - 14:00 1.50 BOPSUR P PRE N/U BOPE. Grease crew service tree valves. 14:00 - 14:15 0.25 RIGU P PRE PJSM. Review procedure, hazards & mitigation for raising windwalls. 14:15 - 15:30 1.25 RIGU P PRE Raise windwalls & secure guy wires. Secure tilt rams in storage frame. 15:30-15:45 0.25 RIGU P PRE PJSM. Review procedure, hazards for P/U injector & stabing Printed: 2/1612004 9.43'41 AM Page 2" BP Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 01-17 01-17 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Date From - To Hours Task Code: NPT . Phase 1/25/2004 15:30 - 15:45 0.25 RIGU P PRE 15:45 - 17:30 1.75 RIGU P PRE 17:30 - 18:00 0.50 BOPSUR P PRE 18:00 - 18:30 0.50 BOPSUR P PRE 18:30 - 00:00 5.50 BOPSUR P PRE 1/26/2004 00:00 - 01 :00 1.00 BOPSURP PRE 01 :00 - 02:00 1.00 FISH P DECOMP 02:00 - 04:15 2.25 FISH N WAIT DECOMP 04:15 - 05:00 0.75 FISH P DECOMP 05:00 - 05:30 0.50 FISH P DECOMP 05:30 - 07:00 1.50 FISH P DECOMP 07:00 - 08:35 1.58 FISH P DECOMP 08:35 - 08:45 0.17 PULL P DECOMP 08:45 -10:15 1.50 FISH P DECOMP 10:15 - 10:45 0.50 FISH P DECOMP 10:45-11:10 0.42 FISH N DPRB DECOMP 11:10-12:30 1.33 FISH N DPRB DECOMP 12:30 - 12:35 0.08 FISH N DPRB DECOMP 12:35 - 13:25 0.83 FISH N DPRB DECOMP 13:25 - 14:45 14:45 - 16:00 1.33 FISH 1.25 FISH N N DPRB DECOMP DPRB DECOMP Start: 1/14/2004 Rig Release: 2/9/2004 Rig Number: N1 Spud Date: 3/13/1978 End: Description of Operations CT. P/U injector from stabbing box. M/U guide arch & stab CT into injector head. Meanwhile RIU hardline to tiger tank & prr to 4000psi. Spot cuttings tank & outside trailers. Rig accepted @ 15:00 Hrs on 01-25-04. Prep to P/test BOPE. Crew change. Prepare to test BOPE. PJSM for testing BOPE. Perform initial BOPE pressure/function test. AOGCC test witness waived by Chuck Scheve. Blind ram test failed. Pull blind rams and replace seals. While replacing seals, bring fishing tools up to rig floor. Replace seals in blind rams. Complete BOP test. MU baker CTC. Pull test to 35,000 Ibs. Schlumberger primary computer not booting up. Wait on computer repair. Pump 4 bbls of 1 % KCL water into coil. Drop dart. Pump dart and fill coil with 1 % KCI. Dart landed at 54.5 bbls. PT inner reel valve and CTC. Unsecure well. Fill hole. WHP = Opsi, lAP = 140psi, OAP = 138psi, & FL is disconnected. PJSM. MIU fishing BHA#1 with Baker 4" GS spear, Bowen up/down jar, 2 jts of PH6 tbg & MHA. Stab injector on well. RIH with fishing BHA #1 to 8800' taking FP MeOH to tiger tank. Up wt check = 39k, Down Wt = 27k. Continue RIH to TOF tagged @ 8832'. P/U & confirm liner engagement with 50k up wt breaking over to 39k after jar lick. Retag @ set down on TOF 3x & P/U with jar licks @41k (or fish slipping off). P/U liner@ 40k. POOH with liner fish pumping across the wellhead. COHo PJSM. SIB injector. UD BHA #1 & observe no fish. Inspect "GS" spear - nothing amiss. MIU fishing BHA#2 with same Baker 4" GS spear, Bowen up/down jar, 2 jts of PH6 tbg & MHA. Stab injector on well. RIH with fishing BHA #2 to 8800'. Up wt check = 38k, Down Wt = 25k. Continue RIH circ @ 1 bpm to TOF tagged @ 8832'. Set down on fish, P/U & RBIH to 8831'. Flush TOF with 1 bpm for 2mins. Set down on fish. SID pump & P/U with 41k breaking over to 38k after jar lick. RBIH a bit faster & set down 3x. P/U to 41 k, jars go off & wt drop back to 38k. Jar down on fish 2x & retry - same results. Set down on TOF & P/U 3x with jar licks @ 40k - fish still slipping off. Set down again & jar down. P/U to 40k & jar up. Pull a bind @ 40k & bring on pumps @ 1 bpm to see if we can circ thru cut & pull free - fish slipped off. Give Up!. Set down on fish prior to POOH. POOH with fishing BHA pumping across the wellhead. OOH. PJSM. SIB injector. UD GS Spear & observe no fish. Inspect "GS" spear - still no unusal marks. Observe pin-hole in little jerks hydraulic hose. Use Farr power tong while W.O. replacement hose for little jerks. MIU fishing BHA#3 w/new Baker 4" GS spear (spray-painted white), same Bowen up/down jar, 2 jts of PH6 tbg & MHA. C/O packoff dies. Drop power tong direction control pinlknob in hole while MIU injector. Pnnted: 2/1612004 9:43:41 AM BP Operations Summary Report Page 3418 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 01-17 01-17 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 1/14/2004 Rig Release: 2/9/2004 Rig Number: N1 Spud Date: 3/13/1978 End: Date From ~ To Hours Task Code NPT Phase Description of Operations 1/2612004 14:45 - 16:00 1.25 FISH N DPRB DECOMP Pin is steel ca. 5" long & knob ca. 9/16" aD. 16:00 - 18:00 2.00 FISH N RREP DECOMP Changeout little jerks hyd hose. Drain BOP stack. SIB BHA#3. Cycle rams & did not see pin. Decide to make a fishingldrift run to ensure the pin fell thru TOL. 18:00 - 19:30 1.50 FISH N DPRB DECOMP RIH with fishing BHA #3. 19:30 - 20:00 0.50 FISH N DPRB DECOMP pu= 38K, SO=25.6K at 8,800'. Tag fish at 8,831'. PU to 41K and popped free. Set down at 8,831' and circulate at 3 bpm. PU to 8,800' circulating. Set down at 8,831'. Shut down pump and PU to 40.5K Ibs. Popped free. Set down and jar down. PU and pop free at 40.5K. Repeat wI same results. Set down. Pump 3.2 bpm, 2,000 psi. Shut down pump and pick up slowly to 40.5K. Pop free again. 20:00 - 21:15 1.25 FISH N DPRB DECOMP POOH. 21:15 - 21:45 0.50 FISH N DPRB DECOMP Pull back injector and circulate coil. lD fishing BHA. Fish not recovered. No wear on GS spear. 21:45 - 23:45 2.00 FISH N WAIT DECOMP Wait on eline crew. 23:45 - 00:00 0.25 FISH N DPRB DECOMP Eline crew on location. Prepare chemical cutter. 1/27/2004 00:00 - 00:30 0.50 FISH N DPRB DECOMP Prepare chemical cutter and test eline tools. 00:30 - 01 :00 0.50 FISH N DPRB DECOMP PJSM for rigging up wireline sheeves and PU chemical cutter. Discuss hazards and mitigations for chemical cutter. 01 :00 - 01 :45 0.75 FISH N DPRB DECOMP RU eline sheeves. PU tools to rig floor. 01 :45 - 04:00 2.25 FISH N DPRB DECOMP RIH w/2 1/8" chemical cutter. Set down at 9,043'. PU for tie in pass. Tie in to liner top. 300 Ib weight bobble at 8,940' and 8,930'. Run in hole. Set down at 8,930'. Attempt to work past several times. Pull into 51/2" tubing. RIH. Set down at 8,880'. 04:00 - 05:30 1.50 FISH N DPRB DECOMP POOH wI chemical cutter. Bottom centralizer is packed with hard paraffin like substance that is preventing the centralizer from collapsing. 05:30 - 07:00 1.50 FISH N DPRB DECOMP RD eline. Call for jet blaster nozzle. 07:00 - 08:00 1.00 FISH N DPRB DECOMP Discuss plan forward with Anchorage. Plan to run jet blaster nozzle to clean out 2 7/8" liner and fishing neck. 08:00 - 09:30 1.50 FISH N DPRB DECOMP While waiting on jet blaster PU 8 joints of CSH and flush with water to clean out pipe. lD CSH. 09:30 - 10:00 0.50 FISH N DPRB DECOMP Wait on Schlumberger jet blaster. 10:00 - 10:30 0.50 FISH N DPRB DECOMP PJSM for PU BHA. 10:30-11:00 0.50 FISH N DPRB DECOMP MU Schlumberger jet blaster, disconnect, 8 joints CSH, MHA, CTC. 11:00 -11:15 0.25 FISH N DPRB DECOMP MU injector. 11:15 - 12:00 0.75 FISH N DPRB DECOMP RIH jet blaster to 8500'. 12:00 -13:00 1.00 FISH N DPRB DECOMP Continue RIH @ 2Ofpm, circ @ 1.12bpm/2250psi. Set down @ 8570' (sliding sleeve). SID pump & roll thru. Continue RIH blasting @ 1.25bpm to 8800'. Up wt check = 34k, Run-in wt = 24k. Set down on TOl tagged 8833'. P/U & SID pump. Flag pipe & reset CTD to 8831'. 13:00 - 13:50 0.83 FISH N DPRB DECOMP Wash down from top of 2-7/8" Inr to 9060' @ 5fpm, blasting @ 1.33bpmI3160psi. 13:50. 14:30 0.67 FISH N DPRB DECOMP Wash up from 9060' to TOl @ 5fpm, blasting @ 1.37bpm/3290psi. 14:30 - 14:50 0.33 FISH N DPRB DECOMP Wash down from TOl to 9060' @ 10fpm, blasting @ 1.36bpm/3150psi. Pump 24bbls of 1# bio pill. Getting back large pieces of asphathene over the shakers. 14:50 -15:20 0.50 FISH N DPRB DECOMP Wash up from 9060' to TOl @ 1Ofpm, blasting @ Printed' 2/1612004 9:43:41 AM BP Operations Summary Report Page 4" Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 01-17 01-17 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 1/14/2004 Rig Release: 2/9/2004 Rig Number: N1 Spud Date: 3/13/1978 End: Date From - To Hours Task Code NPT Phase Description of Operations 1/27/2004 14:50 - 15:20 0.50 FISH N DPRB DECOMP 1.37bpm/3120psi. Jet across TOl area @ 2fpm & 1.35bpm/3080psi. 15:20 - 18:15 2.92 FISH N DPRB DECOMP Wash up from TOl into the 5-1/2" tbg @ 13fpm, blasting @ 1.35bpm/3080psi. Paint EOP flag @ 8480' & continue POOH jet blaster @ 52fpm chasing bio pill out @ 1.36bpm/3180psi. 18:15 - 19:00 0.75 FISH N DPRB DECOMP COHo PJSM. SIB injector. RIB 1-1/4" CSH & UD jet blaster BHA. 19:00 -19:30 0.50 FISH N DPRB DECOMP PJSM for RlU SWS Eline & running string shoUchemical cutter. Review MSDS for BrF3 & HAlHM for eline jobs. 19:30 - 19:50 0.33 FISH N DPRB DECOMP RlU SWS Eline sheeves & P/U 13' string shot & CCl tools to rig floor. M/U tools. From CCl to top string shot = 2.7'. 19:50-20:15 0.42 FISH N DPRB DECOMP RIH with SWS 1.7" OD string shot BHA on eline. 20:15 - 20:35 0.33 FISH N DPRB DECOMP log CCl & tie-into TOl @ 8827'. Position CCl @ 9042.3'. Arm & shoot string shot from 9045' to 9058'. lost 23lbs of string wt & felt shot impact on cable & arm-meter. log off CCl to 8945'. 20:35 - 21 :05 0.50 FISH N DPRB DECOMP POOH with SWS string shot BHA on eline. 21:05 - 21 :35 0.50 FISH N DPRB DECOMP COHo UD string shot. MIU chemical cutter & CCl tools. From CCl to chemical cutter = 13'. From Anchor dogs to chemical cutter = 7'. 21:35 - 23:00 1.42 FISH N DPRB DECOMP RIH with SWS 2-1/8" OD chemical cutter BHA on eline. 23:00 - 23:15 0.25 FISH N DPRB DECOMP log CCl & tie-into TOl@8827'. Position CCl@ 9042'. Arm & shoot chemical cutter @ 9055'. lost 30lbs of string wt & felt shot impact on surface meter. log off CCl to TOL. 23:15 - 00:00 0.75 FISH N DPRB DECOMP POOH with SWS string shot BHA on eline. 1/28/2004 00:00 - 01 :00 1.00 FISH N DPRB DECOMP RID SWS Eline. Inspect chemical cutter - indicates a clean cut profile. Discuss with ANC & decide to eliminate the extra GS spear run & make an ITCO spear run. 01:00 - 01:15 0.25 FISH N DPRB DECOMP PJSM for P/U It co fishing BHA. 01:15-02:20 1.08 FISH N DPRB DECOMP PJSM. M/U fishing BHA#5 with ITCO spear, 4" GS bait sub, Bowen upldown jar, 4jts of 2-3/8" DCs, accelerator & MHA. Stab injector on well. 02:20 - 03:55 1.58 FISH N DPRB DECOMP RIH with fishing BHA #5 to 8700'. Up wt check = 38k, Down Wt = 27k. Continue RIH to TOF tagged @ 8827'. Get 1 jar lick down. 03:55 - 04:00 0.08 FISH N DPRB DECOMP P/U & confirm liner engagement with 40k up wt. Cork jar & retag TOF. Set down 2x on TOF with 2 down jar licks. P/U liner @39k. 04:00 - 05:20 1.33 FISH N DPRB DECOMP POOH with liner fish pumping across the wellhead. 05:20 - 06:00 0.67 FISH P DECOMP COHo PJSM. SIB injector. UD BHA #5 with recovered cut 2-7/8" liner assembly. Norm testing retrieved pipe. 06:00 - 08:00 2.00 FISH P DECOMP PJSM with day crew for lD liner. lD 6 joints 2 7/8" liner and one 29.25' cut joint. 08:00 - 08:15 0.25 STWHIP P WEXIT PJSM for PU BHA. 08:15 - 08:50 0.58 STWHIP P WEXIT PU used D331 mill, straight motor, MWD wI directional gamma, MHA, CTC. 08:50 - 10:15 1.42 STWHIP P WEXIT RIH. 10:15 -15:00 4.75 STWHIP P WEXIT log tie in pass from 8,680' to 8,850' and 8,990' to 9,050'. Went passed liner stub wlo indication. Tagged at 9.080'. PU above stub and run back in hole. Did not see liner top again and tagged at 9,080'. PU above stub. Shut down pump and RIH. Tag liner stub at 9,040'. PU and start pumping. Attempt to go past sub again, tagged at 9,040'. Displace well to clean 1% KCI. Printed: 211612004 943'41 AM Page 5 .. BP Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 01-17 01-17 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Date From - To Hóurs Task Code NPT Phase 1/28/2004 15:00 - 16:30 1.50 STWHIP P WEXIT 16:30 - 16:45 0.25 STWHIP P WEXIT 16:45 - 17:15 0.50 STWHIP P WEXIT 17:15 -17:35 0.33 STWHIP P WEXIT 17:35 - 17:50 0.25 STWHIP P WEXIT 17:50 - 20:30 2.67 STWHIP P WEXIT 20:30 - 20:45 0.25 STWHIP P WEXIT 20:45 - 22:15 1.50 STWHIP P WEXIT 22:15 - 22:25 22:25 - 23:25 23:25 - 00:00 0.17 STWHIP P 1.00 STWHIP P 0.58 STWHIP P WEXIT WEXIT WEXIT 1/29/2004 00:00 - 00:35 0.58 STWHIP P WEXIT 00:35 - 00:45 0.17 STWHIP P WEXIT 00:45 - 01 :05 0.33 STWHIP P WEXIT 01:05-01:15 0.17 STWHIP P WEXIT 01 :15 - 03:10 1.92 STWHIP P WEXIT 03:10 - 03:25 0.25 STWHIP P WEXIT 03:25 - 04:00 0.58 STWHIP P WEXIT 04:00 - 04:45 0.75 STWHIP P WEXIT 04:45 - 05:45 1.00 STWHIP P WEXIT 05:45 - 08:00 2.25 STWHIP P WEXIT 08:00-11:15 3.25 STWHIP P WEXIT 11:15-11:50 0.58 STWHIP P WEXIT 11:50-12:10 0.33 STWHIP P WEXIT Start: 1/14/2004 Rig Release: 2/9/2004 Rig Number: N1 Spud Date: 3/13/1978 End: Description of Operations POOH. PJSM for LO BHA. LO BHA. Cut off Baker CTC. MU OS CTC. Pull test to 35,000 Ibs, PT to 3,500 psi. MU nozzle, stinger, disconnect, XO, CTC. RIH nozzle BHA & see CT EOP flag @ 8970.7' - should be @ +/-9010.6'. Correct CTO (+39.9') to 9010.6'. Continue RIH & tag up @ 9087'. Note that top of cut 2-7/8" liner is 9040' ELMO. Review cementing options with ANC & agree to pump cmt in 2 stages with nozzle @ 9080'. PJSM with all personnel concerning cementing operations. Meanwhile park nozzle @ 9080' & circ @ 2bpm/800psi. Batch mix 8bbls 17ppg class-G cmt with additives fo 1st job Gmt to wt @ 21 :40hrs. Flush/PI lines to 4k. Pu 8bbls c slurry @ 2.0/2.Obpm & 1600psi. Close--ïnner ree clean lines. Chase with KCL@ 2.0/2.Obpm & 1650psi. Pump out 3bbls of cmt past nozzle & lay-in 5bbls of cmt 1:1 to TOC @ 8970'. POOH to safety @ 8600'. Circ @ min rate while W.O.C. to swap out. RBIH @ 75fpm circ @ 2.0/2.Obpm & 1130psi' ing 9080'. PUH to 8600'. Meanwhile batch m' 5bbls 1 class-G cmt with additives for 2nd job. @ 23:50hrs. RBIH & park nozzle @ 9080'. Flush/PT lines to 4k. Pump 14.9bbls cmt slurry @ 2.0/2.Obpm & 1800psi. Close inner reel valve & clean lines. Chase with KCL @ 2.5/2.5bpm & 2250psi. Pump out 7bbls of cmt past nozzle & lay-in 7.9bbls of cmt 1:1 to TOC @ 8738:. Gmt ín place @ 00:35Hrs. POOH to safety @ 8600'. Pump down 30bbls of bio pill & chase to nozzle. Meanwhile got back ca. 18bbls of contaminated cmt from 1 st job - telling we were very close to a hard btm @ 9080'. ~ RBIH @ 18fpm circ @ 2.9/2.9bpm & 1450psi jetting down to 8876'. Make 2 more up/down passes washing tbg profiles. POOH jetting uphole & washing tbg profiles @ 2.9bpm. Got back very little contaminated cmt from 2nd job. OOH. PJSM. UO Cement nozzle BHA. M/U swizzle stick & jet BOP stack. UO swizzle stick & SIB injector. PJSM. M/U cement milling BHA #8 with 3.80" HC 0331 mill, 2-7/8" WF motor with 1.25deg ABH, Sperry GR-OIR MWO & orienter, 2 jts of 2-3/8" PH6 tbgs & WF MHA (OAL = 127.12'): Scribe tools. Install WF CTC. Pull test to 35k. P/test MHA & CTC to 3500psi. MIU injector. RIH cement milling BHA #8. SHT MWO @ 1000' - pulsing off & on. Troubleshoot MWO & rectify pulses. Continue RIH. WOC to gain compressive strength. Cement at 4,000 psi, compressive strength. Tie in. +7' correction. RIH and tag cement stringer at 8,899'. Wash down to 8,914' at -- Printed 2/1612004 9'43"41 AM BP Operations Summary Report Page 6 ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 01-17 01-17 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 1/14/2004 Rig Release: 2/912004 Rig Number: N1 Spud Date: 3/13/1978 End: Date From - To . Hours Task Code NPT Phase Description of Operations 1/29/2004 11:50-12:10 0.33 STWHIP P WEXIT 220 fph. 12:10 - 13:30 1.33 STWHIP P WEXIT Pull up hole and wait on cement. 13:30 - 18:00 4.50 STWHIP P WEXIT Mill hard cement from 8,920' to 9,000' at 150 R of HS at 20 fph. 18:00 -18:40 0.67 STWHIP P WEXIT Continue milling hard cement with bio-KCL from 9000' to 9008" with 150R TF, 2.6/2.6bpm, 2200/2580psi, 15fph ave consistent ROP. Finish LS cement pilot hole. 18:40 - 18:50 0.17 STWHIP P WEXIT Orient TF to 30L for HS cement ramp. 18:50 -19:45 0.92 STWHIP P WEXIT Mill 12' cement ramp in hard cement from 9008' to 9020' with 20-30L TF, 2.6/2.6bpm, 2250/2580psi, 15fph ave consistent ROP. 19:45 - 19:55 0.17 STWHIP P WEXIT PUH to 8750' @ HS TF, 2.5bpm, 2250psi & 60fpm. 19:55 - 20:45 0.83 STWHIP P WEXIT Log up GR from 8750'. Subtract l' from CTD. Paint EOP flag @ 8500'. 20:45 - 22:00 1.25 STWHIP P WEXIT POOH cement milling BHA#8. 22:00 - 22:30 0.50 STWHIP P WEXIT DOH. SIB injector. Flush BHA. RIB 2jts of 2-3/8" PH6 tbg. UD 1.25deg ABH motor & D331 mill. 22:30 - 23:00 0.50 STWHIP P WEXIT M/U window milling BHA #9 with 3.80" HC DPO088 mill,.2-7/8" WF 3deg fixed motor, Sperry GR-DIR MWD & orienter, 2 jts of 2-3/8" PH6 tbgs & WF MHA (OAL = 126.97'). Scribe tools. M/U injector. 23:00 - 00:00 1.00 STWHIP P WEXIT RIH window milling BHA #9. SHT MWD @ 4500' - OK. Continue RIH. 1/30/2004 00:00 - 00:45 0.75 STWHIP P WEXIT Continue RIH window milling BHA #9. Correct -3' @ the flag. Tag up @ 8719'. P/U & kick-on pumps & roll thru. Continue RIH & tag 9-5/8" csg wall @ 9020'. 00:45 - 01 :00 0.25 STWHIP P WEXIT PUH & orient TF to 30L. SID pump. RBIH & tag csg wall @ 9020'. Check TF - @ 15L. Establish freespin @ 2250psi. Paint flag & P/U 1'. 01 :00 - 06:00 5.00 STWHIP P WEXIT Begin extended time milling schedule. Mill from 9019' to 9020' with HS TF, 2.6/2.6bpm, 2270psi. 06:00 - 09:00 3.00 STWHIP P WEXIT Continue extended time milling schedule. Start seeing woe at 9,020.6'. Time mill to 9,021.0'. Lost #1 mud pump. Switch to #2 pump and got a click. Pressure is up to 3,600 psi. 09:00 - 10:45 1.75 STWHIP P WEXIT Pick up into pilot hole and orient around. Pressure still 1300 psi higher. Swap back to pump #1. Pressure 3,600 psi. Pull into 5 112" tubing, pressure still high. Orient and pressure came back down to 2,300 psi. 10:45 - 18:00 7.25 STWHIP P WEXIT RIH w/o pump. Tag at 9,020.9'. PU and bring on pump. TF 10L. Tag lightly at 9,020.9'. Pick up one foot and start window milling time schedule over. Mill to 9,021.6'. Bleed IA to 10 psi and OA to 150 psi. 18:00 - 22:50 4.83 STWHIP P WEXIT Continue extended time milling schedule. Mill to 9025' with 10L-HS TF, 2.6/2.6bpm, 2300/2750psi & 3-4k woe. Getting good amount of metal shavings on ditch magnets. 22:50 - 00:00 1.17 STWHIP P WEXIT Mill to 9026.2' with 1Q-20L TF, 2.6/2.6bpm, 2850psi & 4-5k woe. 1/31/2004 00:00 - 01 :30 1.50 STWHIP P WEXIT Continue time milling to 9027' with 20-30L TF, 2.6/2.6bpm, 2950psi, 1fph & 5-6k woe. Observe pressure dropping to 2750psi, woe dropping to 4k & TF walking back to 15L. Stall @ 9027.4'. P/U & establish freespin @ 2450psi. Ease back into milling & break into formation. TOW = 9020'; BOW = 9027'. 01 :30 - 02:15 0.75 STWHIP P WEXIT Mill formation to 9036' with 1Q-20L TF, 2.612.6bpm, 2450/2650psi, 1Ofph ave ROP & 4k woe. Printed. 2/1612004 94341 AM , . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 7'" BP Operations Summary Report 01-17 01-17 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Task Code NPT 1/31/2004 02:15 - 02:30 From - To Hours 0.25 SlWHIP P Date 02:30 - 04:10 04:10 - 04:45 04:45 - 05:15 05:15 - 07:30 07:30 -11:30 11:30-13:00 13:00 -14:00 14:00 - 15:15 15:15 - 16:00 16:00 - 16:40 16:40 -18:15 18:15 -18:45 18:45 -18:50 18:50 -19:55 19:55 - 20:10 20:10 - 00:00 2/1/2004 00:00 - 05:30 05:30 - 06:00 06:00 - 11 :50 11:50-12:10 12:10 - 12:20 12:20 - 18:25 18:25 - 19:25 ..... 1.67 SlWHIP P 0.58 SlWHIP P 0.50 SlWHIP P 2.25 SlWHIP P 4.00 SlWHIP P 1.50 SlWHIP P 1.00 SlWHIP P 1.25 SlWHIP P 0.75 DRILL P 0.67 DRILL P 1.58 DRILL P 0.50 DRILL P 0.08 DRILL P 1.08 DRILL P 0.25 DRILL 3.83 DRILL P P 5.50 DRILL P 0.50 DRILL P 5.83 DRILL 0.33 DRILL 0.17 DRILL 6.08 DRILL P P P P P P 2.33 BOPSUFP Phase WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Start: 1/14/2004 Rig Release: 2/9/2004 Rig Number: N1 Spud Date: 3/13/1978 End: Description of Operations Backream rat hole & window from 9036' to 9015' with 1 OL TF, 2.6/2.6bpm, 2450psi, 65fph aye ROP & 4k woe. Paint EOP flag @ 8500' & POOH window milling BHA#9. COHo SIB injector. Flush BHA. RIB 2jts of 2-3/8" PH6 tbg. UD 3deg fixed motor & DPO088 mill. Mill gauge 3.80" go 13.79" no-go & wear on mill face indicates that center crossed the csg wall. M/U window dressing BHA #10 with 3.79" WF diamond crayola mill, 2-7/8" WF 2.25deg ABH motor, Sperry GR-DIR MWD & orienter, 2 jts of 2-3/8" PH6 tbgs & WF MHA (OAL = 127.5'). Scribe tools. M/U injector. RIH window dressing BHA #10. SHT MWD @ 4500' - OK. Continue RIH. Correct to 8,500' EOP, -1.5'. Tie in to GR, +1'. RIH wlo pumping. Tag at 9,029'. Bring on pump, TF 45R. Orient to 31L. Reduce rate. Set down at 9,027'. PU w/overpull. PU wI overpull and repeat. PU w/5K overpull and check TF, 31L. SD pump. RIH and tag at 9,027'. PU 4' and bring up pump. TF 8L. Tag at 9,027' and stall motor. PU and dress window at 11 L. Stalling at 9,027'. Ream down through bottom of window from 9,027' to 9,029' at 11L TF. Backreamwindowfrom9,029't09,018'at11L. Back ream window at 27R. Tag bottom at 9,036'. Orient around to 49L. Back ream window. Drift wlo pump. Orient 25L, start new mud down coil. Back ream window. POOH while displacing to reconditioned flo pro. Clean pits. LD crayola milling BHA. Mill gauged 3.78". PU drilling BHA. Change CTC. Pull test to 35 Kips and PT to 3,500 psi. RIH. SHT MWD and orienter. RIH. Log down GR from 8720'. Subtract 4' from CTD. RIH to 8950'. Orient TF to 15L. RIH & tag TD@ 9035'. Drill to 9045' with 20L TF, 2.6/2.6bpm, 3300/3480psi, 14fph av ROP. TF roll to 30R. Orient TF around to 50L. Drill Shublik to 9080' with 50-70L TF, 2.6/2. 3250/3550psi, 15fph aye ROP. Orient & drill Shublik to 9150' 0-75L TF, 2.6/2.6bpm, 3000/3450psi, 15fph av . Get a drilling break @ 9150'. Orient & drill to 9 with 60L TF, 2.6/2.6bpm, 310013550psi, 45fph aye Dril ,350' at 2.5/2.5 3,000/3,280 psi. iper trip to window. Orient to 77L. Drill to 9442' with 2.5/2.5 3,200/3,400 psi 10 - 30 fph average ROP. Drill to 9446' with 70L TF, 2.5/2.5bpm, 3000/3250psi, 4fph aye ROP. Penetrated Zone-3 @ 9395' & expect to penetrate Zone-2 @ +1- 9500'. Decide to POOH due to very slow ROP. Paint EOP flag @ 8500' & POOH drilling BHA#11. COHo SIB injector. Flush & UD BHA. Bit gauge 8/6/1 with a partially rung-out nose. PJSM. Grease master & swab valves & perform weekly BOPE Printed. 2/1612004 9'4341 AM \ ( bp To: Winton Aubert Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: M.S. Endacott CTD Engineer Date: January 8, 2004 Re: CTD Sidetrack of we1l1-17A 1-17A is scheduled for a thru-tbg sidetrack with CTD rig, Nordic 1. From a cement ramp, 01-178 will build from a Sag River kick off to a Zone 2 target. The liner will be cut and pulled then the cement ramp laid in. /' The following describes work planned to prep for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. 1. Confirm mechanical integrity. 2. Install CIBP in 2 7/8" liner / 3. Cut and pull ~ove top of cement 4. Lay in minim. 8 _,91 cement for cement ramp kick off Prep will likely begin January 12th, Nordic 1 is currently scheduled to arrive on the well - 19th January. 1?1 J tfj ia 75/f- ¡, -~ ..t¿7 M.S. Endacott CTD Drilling Engineer CC: Well File Terrie Hubble vJ óA (/8{ ZtJOi.f . . ~ STATE OF ALASKA ( lJ7j I/J I cJ-. ALASKA OIL AND GAS CONSERVATION COMMISSION )if) IS1i APPLICATION FOR SUNDRY APPROVAL 20 MC 25.280 1. Type of Request: 181 Abandon 0 Suspend 0 Operation Shutdown 0 Perforate 0 Waiver 0 Other 0 Alter Casing 0 Repair Well 181 Plug Perforations 0 Stimulate 0 Time Extension 0 Change Approved Program 0 Pull Tubing 0 Perforate New PaolO Re-Enter Suspended Well 0 Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. all Development 0 Exploratory 195-182,,;' 3. Address: 0 Stratigraphic Test 0 Service 6. API Number: / P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20289-01-00 7. KB Elevation (ft): KBE = 73' 9. Well Name and Number: /' PBU 01-17A 8. Property Designation: 10. Field / Pool(s): ADL 028329 Prudhoe Bay Field / Prudhoe Bay Pool 11. .'.. ' ',.,.' .' ,,'.' .', .' ,.. ,'.. ".', .,.'...." RRESENTWEL.LCONDITIONSUMMA~Y"',, ....,...,1, ,i~ .'... ...'...' ,..'"" ... Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10345 9055 10331 9054 None 9860 ,Cashjg"" '..,?~ ",' ':Lê'Oath: 1'...'..'.....'.'....'...~ISi!i7~):':~',",~~:'.... 'nn! ..i:'..i: ":.".". '..'."'.""......':,"', '",.:Bursf.~~~" :,',CÓllapše\,..,..,.., ~trIIMIII"'='1 rnnr18 .I"'tnr 119' 20" 119' 119' Surface 2704' 13-3/8" 2704' 2704' 5380 2670 IIIL~. .. 9416' 9-5/8" 9416' 8908' 6870 5080 pl"l"\rh I/'tion LinAr 1514' 2-7/8" 8831' - 10345' 8403' - 9055' Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9635' - 10320' 9003' - 9053' 5-1/2" 17# x 4-1/2" 12.6# N-80 8896' Packers and SSSV Type: 9-5/8" x 5-1/2" Baker 'SAB' packer; Packers and SSSV MD (ft): 8774' 5-1/2" Camco 'Bal-O' SSSV Nipple 2209' 12. Attachments: 13. Well Class after proposed work: 181 Des~ription Su~mary of Proposal 0 BOP Sketch 0 Ex lorato 181 Development 0 Service 0 DetaIled Operations Program p ry 14. Estimated Date for """,,""-j 15. Well Status after proposed work: Commencing Operations: Janu~~f~-2Ö04 0 Oil 0 Gas 0 Plugged 181 Abandoned 16. Verbal Approval: ~~... 0 WAG 0 GINJ 0 WINJ 0 WDSPL Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mary Endacott, 564-4388 Printed Name Mary Endacott Title CT Drilling Engineer Thomas McCarty, 564-4378 /] /, , I .riJ . /' ~ l' ' J. Prepared By Name/Number: Siç¡nature '"11 ~1/ j'y:!,11/; jl?J~/¿"1xl ---. Phone 564-4388 Date ~ I 73 I Ó~' Terrie Hubble, 564-4628 ,:",.,:",',"', ,',,' ,('..'r.'~(1."".:'.' ¡g:,'" ",.",~""",. ,." ~":,:,,,':.':'.":";"': Sundry Number: 304 -OCJIo Conditions of approval: Notify Commission so that a representative may witness 0 Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance R E eEl VE D Other: JAN 0 8 2004 I. L JAM 0 9 200\ Alaska Oil & Gas Cons. Commission Subsequentform required 10- 40 7 _SF Anchorage. Ort . . BY ORDER OF \ "'/<.7 Of Approved By: ~nal S~~~ By COMMISSIONER THE COMMISSION Date '" ~ Form 1 0-403 Re~..~S:d. 12120~~.'.1.. ... Rë . -'. OR I G \ N A L SL bm¡ In D Jplicate ~~(;ANNEL I\jjQ~~ JL ~ 2004 " . . TREF= GRAY GEN II 11' 0 1 17 B ('" ("' I SAFETY NOTES WRLHEAO= GRAY' - ACTUA TOR= AXRSON . KB. REV = 73' Proposed CTD SIdetrack BF. REV = KOP = 4438' \Vax Angle = 91 @ 10173' Datum MD = 9375' 2209' 1 5-1/2' CAMCO BAL-O SSSV NIPPLE. I Datum lVD= 8800' SS e 10= 4.562 I 13-3/8" CSG, 72#, N-80, 10 = 12.347" I 2704' Minimum ID = 2.372" @ 8831' I I 8591' 2-7/8" PIN CONNECTION 8666' 5-1/2" CAMCO DB-5 LANDING NIP, 10 = 4.3 8757' 5-1/2" BAKER SBR ASSY I I 5-1/2" TBG-NPC, 17#, N-80, .0232 bpf, 10 = 4.892" I 8774' 9-5/8" x 5-1/2" BAKER SAB PKR, 10 = 4.00 ITOPOF 4-1/2" TBG-NPC 8786' 8786' XO 5-1/2" X 4-1/2" I I TOP OF CEMENT I 8840' 8840' -1 Top of 3-3/16" LinerfTOC I I 4-1/2" CAMCOOB-6 NIP(BEHINOLNR), 8843' 1 8850' 1-i3-1/2" X NIP 10 = 2.813" I 4-1/2" 1BG-~ 12.6#, N-80. .0152 bpf. 10 = 3.958" 8896' 8896' 4-1/2' ìlBlt\G TAL (BB-fl:> Lf\.R) 8888' RM TUBING TAIL - LOGGED 4/1/78 8970' -1TOC (CEMENT RAMP) I /" I I Cement Rat1l) Window I 9020' 1 3-3/16" X 2-7/8" Liner I ÆRFORA TION SUMMA RY REF LOG: BHCS ON 3/24n8 9060' -1 Cut and Pull 2-7/8" liner I ANGLE A T TOP ÆRF: 79 @ 9635' ,/ Note: Refer to Production DB for historical perf data 9100' 1-1 CIBP I SIZE SPF INTERVAL Opn/Sqz DATE 2-118 4 9835-9645 isolated proposed I t./ILLOUTWINDOW 9416 - 9420 I 2 4 9795-9804 isolated proposed 2-1/8 4 9805-9815 isolated proposed NA 4 10170-10220 isolated proposed BAKERCIBP(SET11/25/96) NA 4 10240-10320 isolated proposed (MILLED & PUSHED DOWN 4/28/0C 10022' BAKER N-3 CIBP-NON I PBTD I 9818' RlVBL (SET 08/02/96) I 9-5/8" CSG, 47#, N-80, 10 = 8.681" I 9860' I 2-7/8" LNR, 6.4#, L-80, .0058 bpf. 10 = 2.44" I 10345' DA TE REV BY COMMENTS DA TE REV BY COMMENTS PRUDHOE BA Y UNIT 01/22/96 ORIGINAL COMPLETION WRL: 01-17A 01/23/96 LAST WORKOVER PERMIT No: 95-182 12/15/00 SIS-LG CONVERTED TO CANVAS API No: 50-029-20289-01 02/16/01 SIS-MD FINAL SEC8 T10N R15E 1406.68 Fa. 3362.68 FNL 04/25/01 RN/TP CORRECTIONS BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Pedorate _X Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) Phillips Alaska, Inc. Development__X RKB 73 feet 3. Address Explorato~___ 7. Unit or Property name P. O. Box 100360 Stratigraphic__ Anchorage, AK 99510-0360 service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 189' FNL, 4632' FEL, Sec. 8, T10N, R15E, UM (asp's 697962, 5940712) 01-17A At top of productive interval 9. Permit number / approval number 4276' FNL, 924' FEL, Sec.06, T1 ON, R15E, UM (asp's 696357, 5941865) 195-182 At effective depth 10. APl number 50-029-20289-01 At total depth 11. Field / Pool 3363' FNL, 1407' FEL, Sec. 6, T1 ON, R15E, UM (asp's 695846, 5942763) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10345 feet Plugs (measured) PBTD tagged (6/07/2000) @ 9876' MD. true vertical 9055 feet CIBP @ 10022' MD. Effective depth: measured 9876 feet Junk(measured)ORIGINAL true vertical 9036 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 119' 20" 250 Sx AS 11 9' 119' Surface 2631' 13-3/8" 5800 Sx PF II 2704' 2704' Production 9343' 9-5/8" 9600 sx Class G 9416' 8908' Uner 1514' 2-7/8" 24.5 bbls LARC 10345' 9055' Perforation depth: measured 9635' - 9645'; 9795' - 9815'; (isolated below ClBP are 10170' - 10220' & 10240' - 10320'). true vertical 9003' - 9005'; 9028' - 9030'; (isolated below ClBP are 9048' - 9048' & 9049' - 9053'). Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80 NPCT @ 8786' MD; 4-1/2", 12.6#, N-80 NPCT @ 8896' MD. ~'*.~ i~'~i' Packers & SSSV (type & measured depth) 9-5/8" X 5-1/2" BAKER SAB PACKER @ 8774' MD. 5-1/2" CAMCO BAL-O SSSV @ 2209' MD. i ,i! !'~' I 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Aisska 011 ~.,.. (:;:~.~: Treatment description including volumes used and final pressure :'~ 14. Representative Daily Avera.qe Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation - - Subsequent to operation 814 35269 0 969 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations ___X Oil ~X Gas __ Suspended ~ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed "~'~ % , ~,4~-,...,~ Title PAl Wellwork Design & Optimization Supervisor Date Erin Oba Prepared by Paul Rauf 263-4990 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 01-17A DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS Date Event Summary 4/28/2000: 6/03/2000: 6/06/2000: 6/07/2000. 6/15/2000: 6/17/2000: RIH & milled CIBP @ 9730' w/2.30" mill. Pushed it to 9860' MD, exposing 9805' - 9815' perfs. Swapped to Crude. RIH & tagged fill @ 9558' MD. MIRU CTU. PT'd equip to 3500 psi. RIH w/Mem GR/CCL tools & tagged obstruction @ 9595'. POOH w/logging tools. RIH w/nozzle & 21' 2.2" bar. FCO'd to 9850' & POOH. RIH & logged well f/PBTD @ 9876' to 8700' MD. POOH w/logging tools. RIH w/ perforation guns & shot 20' of perforations as follows: Add perforated: 9795' - 9804' MD (Zone 2B) Reference Log: TDT 1/21/1996. Reperforated: 9805' - 9815' MD (Zone 2B) Used 2" carriers & all shots @ 4 SPF, 60° phasing, & random orientation. POOH w/guns. ASF. Swapped well to Crude. RD CTU. Injectivity test: 3.9 bpm @ 3900 psi; 3 bpm @ 3400 psi; 2 bpm @ 2600 psi; 1 bpm @ 1900 psi. N2 lift. Placed well BOL & obtained representative welltest data. Page 1 95 ~-- i 82 95 .... 18©:~ 85-' i 82 95--'i 82 p, ,.;. ..... i p. ,-., !ii 5 ...... i 82 9 5 --- 'i 8 2 95 .... i 82 [7: A i'/', I D A l" A i:::' l.. i.j ::.; l D T F.' ....:..::- S .F: F' I A 7 i 2 '? ~--r'[:, T F' ,S R/F:: O I:: .... i',.i P ~ S ..F:.. F' I A (..:..; R ..... T V D ~ S E P Z A 7 ! 5 2 'F D T-' F' ii:*, O k A X q5 5'-0- ¢.B'F'.-' TD T ..... [-:' E, ,.':-', F: A X /O..Z c/)~- DAZLY VCELL R 1/'J ;X/"-':¢F/ T 0 I / 2, ~/' ¢5/" ex, q:F'"% q~/o~,~ 0 P S /:'-, F' e ~.,,/,.'--t.-. 'l i 1~ :a s ~: s i-' e q u 'i r" e d '? y e s Wei'J '¥s 'in cornp'i'iance :.T. n '~ 'k '¥ a 1 C Ok1 H E N 'I" S T / ... STATE OF ALASKA A,,~SKA OIL AND GAS CONSERVATION COMMISSlu,, REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown _ Stimulate~ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _X 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development_X 73' RKB 3. Address: Exploratory_ 7. Unit or Property: P.O. Box 100360 Stratagrapic _ Anchorage, AK 99510-0360 Service_ Prudhoe Bay Unit 4. Location of well at surface: 8. Well number: 191'S & 646' E of NW ct, Sec 8, T10N, R15E, UM. 1-17A At top of productive interval: 9. Permit number/approval number: 1003' N &924' WofSE ct, Sec6, T10N, R15E, UM. 95-182 At effective depth: 10. APl number: 50-029-20289-01 At total depth: 11. Field/Pool: 3363' FNL, 1407' FEL, Sec 6, T10N, R15E, UM. Prudhoe Bay Oil Pool 12. Present well condition Summary Total Depth: measured 10345 feet Plugs(measured) ClBP's @ 9730' & 10022' MD. (""'~ D I ~_ I ~1 jl~ true vertical 9055 feet Effective Depth: measured 9730 feet Junk (measured) true vertical 9020 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 119' 20" 250 Sx Arcticset 119' 119' Surface 2631' 13-3/8" 5800 Sx PF II 2704' 2704' Production 9343' 9-5/8" 960 Sx Class G 9416' 8908' Production 1514' 2-7/8" 24.5 Bbls LARC 10345' 9055' Perforation Depth measured 9635- 9645'; (Isolated Below Bridge Plugs: 9805- 9815'; 10170- 10220'; 10240- 10320') true vertical 9002- 9005'; (Isolated Below Bridge Plugs: 9029- 9030'; 9048- 9048'; 9049- 9053') Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 8786' MD; 4-1/2", 12.6#, N-80, NPCT @ 8896' MD. Packers and SSSV (type and measured depth) Baker SAD Packer @ 8774' MD; BaI-O SSSV @ 2209' MD. Alaska Oil & ^p. chor~.~.Sa 13. Stimulation or cement squeeze summary Intervals treated (measured) see attached Intervals treated (measured) 14. Representitive Dally Average Production or Injection Data J OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1375 35371 0 1746 Subsequent to operation Shut In - 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _ X Oil _X Gas _ Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. iSigned '~,,Of~ ~ · ~ Title: Engineering Supervisor Date '~- //'" Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE ~, 1-17A DESCRIPTION OF WORK COMPLETED BRIDGE PLUG INSTALLATIONS FOR GAS SHUTOFFS & ADD PERFORATIONS 5/8/96: Performed a Borax PNL & confirmed a channel up from top of perforated interval. 8/2/96: MIRU CTU & PT equipment. Loaded wellbore w/1% KCI Water, then RIH w/a non retrievable Baker N-3 CIBP. Set the CIBP in the liner at 10022' MD, to isolate the open perforations at: 10170 ~ 10220' MD 10240 - 10320' MD Ref. Log: BHCS 3/24/78. POOH. Rigged down. 8/3/96: RIH w/perforating gun & shot 20' of CTE add perforations as follows: Added perforations: 9635 - 9645' MD 9805 - 9815' MD Ref. Log' BHCS 3/24/78. Used 2-1/8" carriers & shot perfs at 4 spf at zero degree phasing at underbalanced pressures. POOH w/perf guns. Rigged down. 11/25/96: MIRU CTU & PT equipment. Loaded wellbore w/1% KCI Water, then RIH w/a non retrievable Baker CIBP. Set the ClBP in the liner at 9730' MD, to isolate the open perforation interval at: 9805 - 9815' MD Ref. Log: BHCS 3/24/78. POOH. Rigged down. 2/18/97: RIH w/perforating gun & shot 10' of CTE reperforations as follows: Reperforated: 9635- 9645' MD (Z2. B) Ref. Log: BHCS 3/24/78. Used 2-1/8" carriers & shot perfs at 4 spf at 180 degree phasing at underbalanced pressure POOH w/perf guns. Noted all shots fired. Rigged down. Attempted to place the well on production w/lift gas. Well would not flow. Shut in well. Future wellwork options are being evaluated. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10307 Company: Alaska Oil & Gas Cons Comm Attn- Howard Okland 3001 Porcupine Drive Anchorage, AK 99501 7/29/96 Field: Prudhoe Bay Anadrill Anadrill Anadrill Flopp, Well Job # Log Description Date BL RF Sepia Survey Program Performance Disk '~---. 9'/,~- '~- Calculation Letter D.'S., 1-17A ¥~, 96149 D, UALBURS. TTDT-P,B. ORAX 960508 1' 1 1 D.S. 15-49 DUAL BURST TDT-P 960617 I 1 . , '% AUG 0 2 .N~ SEa 0ii ~ Ga~ SIGNED: DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airt)()rl Road Anchorage, AK. 99518-'1199 ATTN: Sherde NO. 10228 Company: Alaska Oil & Gas Cons Comrn Attn: Howard Oakland 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay D;S. 11-13A~'~I,~j 96144 CNT-D 960506 1 D.S. 3-33 # ')1]~ 96(_j5..6.. CNT-D 960214 .... 1 D,S. 1-15A ------' PROD PR(~FiLE 96051 5 1 1 D,S. 1-17A ~-'"~' TEMPERA'lURE 960505 I 1 D.S. 1-19 '-'"' PROD PROFII..E 960425 1 1 D.S. 2-2 --~" PERF RECORD 96051 I I 1 D.S. 2-4 c----'" PERF F{ECOt:{D 960507 I 1 D.S. 2-10 PERF F'IECORD :960507 1 1 D.S, 2-25 ~ PROD PROFILE :960427 I 1 ,,, , D.S. 3-12 ~ INJEC PROFILE !960501 I 1 , D,S. 3-17 ~ INJEC PROFILE 960501 I 1 D.S. 4-30 ST ---~'" CNT-D 960510 1 1 D.S. 5-16A ~ TBG PATCH & POGLM 960426 1 1 D.S. 5-25 ----"'"' DUAL BUt{STTDT-P 960425 I 1 D.S. 6-08A ~ PROD PROFILE 960424 I 1 D.S. 6-23 ~ PROD PROFILE 960424 1 1 D.S. 11-13A,--''~ CNT-D 960506 1 1 D.S. 11-23A ~ LEAK DETECTION 960506 I 1 D.S. 11-30 ,--' PERFRECORD 960510 I I ... D.S. 15-39 '--'" PROD PROFILE 960430 I 1 ~D.S. 16-5 ~ 'PERFRECORD 960504 I I i ,~ '-~ ~'~"i~,. ?~..".,'"'~ D.S. 18-01A ,---'/" PERFRECORD 960501 I 1 ., D.S. · _ '"' ~" _/~'~,," _... ~'~ SlGN ED: __ .--- ~ DATE: ~0~a§e. Pleases~/g~ an~r of this trans~nittal to Sherrle at the above address. Thank you. 616196 Anadrill Anadrill Anadrill Floppy Well Job # Log Description Date BL RF Sepia Survey P~'ogran~ Performance Disk Calculation Letter D F:! I I_/I I~1 G S E I::t~1 C I~ S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 ~ ~-'~'~ [' ~ ~ MWD Formation Evaluation Logs - DS 01-17A June 06, 1996 AK-MW-60007 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted magnetic tape with LIS listing. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company I-I I::t I I__1__ I I~ G S E FIL~I I-- I~ S WELL LOG TRANSMITr~ To: State of Alaska June 06, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - DS 01-17A, AK-MW-60007 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention oi~ Jim Galvin, Sperry-Sun Ddlling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 DS 01-17A: 2" x 5" MD Gamma Ray Logs: 50-029-20289-01 2" x 5" TVD Gamma Ray Logs: 50-029-20289-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMrvi,~.SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well OIL ~] GAS ~ SUSPENDED [] ABANDONED 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 95-182 3 Address 8 APl Number P.O. Box 100360, Anchorage, AK 99510-0360 50-029-20289-01 4 Location of well at sudace~ ~~ 9 Unit or Lease Name 191' S & 646' E of NW cr, Sec 8, T10N, R15E, UM. ' ........... "; PRUDHOE BAY UNIT AtTop Producing Interval }-/~"~'~"-- :'! t 5~,-",~_.,~..,/_,.._.-,., 10 Well Number 1003' N & 924' W of SE cr, Sec 6, T10N, R15E, U At Total Depth , 11 Field and Pool 3363' FNL, 1407' FEL, Sec 6, T10N, R15E, UM. ' PRUDHOE BAY FIELD 5 Elevation in feet (indicate KB, DF, etc.) 6 Lease Designation and Serial No. PRUDHOE BAY OIL POOL 73' RKB ADL 28329 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. 115 Water Depth, if offshore 116 No. of Completions 1/14/96. 1/18/96. 1/23/96.I N/A feet MSLI 1 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 DirectionalSurvey ]20 Depth where SSSV set 121 Thickness of permafrost 10345' MD/9055'TVD 10331' MD/9054'TVD YES [~ NO [~I 2209' feetMDI 1900' (approx) 22 Type Electric or Other Logs Run MWD, GR, TDT-P. 23 CASING, LINER AND CEMENTING RECORD SE-I-I-lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surf 119' 30" 250 Sx Arcticset 13-3/8" 72# N-80 Surf 2704' 17-1/2" 5800 Sx PF II 9-5/8" 47# N-80 & Surf 9416' 12-1/4" 960 Sx Class G RS&SM-95 2-7/8" 6.4# L-80 8831' 10345' 3-3/4" 24.5 bbls Latex Acid Resistive Cmt 24 Pedorations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5-1/2" Tbg to 8786' 8774' 10170 - 10220' MD; 9048 - 9048' MD; at 4 spf. 4-1/2" Tbg 8786 - 8896' 10240 - 10320' MD; 9049 - 9053' MD; at 4 spf. 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED N/A 27 PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 1/28/96. J F ow rig. Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO 1/28/96. 4.0 TEST PERIOD ¢I 9717 FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press 1840 24-HOUR RATE ¢ 2047 19891 17 28 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. *Note: 1-17A CTD Sidetrack operations summary attached.0 ' This 10-407 submitted as directed per 10-401 approved on 11/22/95 (Permit # 95-182). Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGE; MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 9119' 8655' N/A 31. LIST OF A'FI'ACHMENTS Summary of 1-17A Coil Tubing Drilled Sidetrack operations. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ¢~,~ % ~ Title Engineering Supervisor Date 3-~--/-- % INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 1-17A DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING 1/12/96: Milled a pilot hole through the cement plug to 9395' MD. 1/13/96: Continued drilling pilot hole to 9415' MD. POOH w/pilot milling BHA. MU & RIH w/window milling BHA. Oriented & started milling a window through the 9-5/8" casing at 9416' MD. Completed milling window at 9420' MD, and continued drilling formation to 9423' MD. Backreamed window & POOH w/BHA. 1/14/96: MU & RIH w/drilling BHA. Oriented through window & drilled 3.75" sidetrack build section to 9430' MD, then displaced well to FIo-Pro. Drilled build section to 9585' MD. POOH w/BHA. MU & RIH w/drilling BHA. Continued drilling to 9593' MD. 1/15/96: Drilled to 9700' MD. Short tripped & stuck pipe at 9410' MD. Swapped FIo-Pro to Crude & worked to free pipe. Couldn't free pipe & swapped back to FIo-Pro. Disconnected & POOH w/CT leaving TOF at 9450.5' MD. RIH w/fishing tools & latched fish. Jarred up & POOH w/fish. 1/16/96: MU & RIH w/drilling BHA. Circulated Hi-vis sweeps through the 9-5/8" casing, then displaced to new FIo-Pro & reamed tight spots to 9697' MD. Continued drilling to 9908' MD. 1/17/96: Drilled from 9908' to 10100' MD & pumped Hi-vis sweep. circulated Hi-vis sweep & POOH w/BHA. Drilled to 10207' MD, then 1/18/96: MU & RIH w/drilling BHA. Drilled to TD at 10345' MD, circulated Hi-vis sweep, & POOH w/BHA. 1/19/96: MU 2-7/8" liner assembly, then shut down work to wait on weather. 1/20/96: Wait on weather. RIH w/liner & landed shoe at 10345' MD (TOL at 8830' MD). Circulated to condition mud, then pumped 24.5 bbls of Latex Acid Resistive Cement followed by biozan, to cement liner. Unstung from liner & POOH displacing FIo-Pro w/1% KCI Water. RIH w/nozzle & jet washed liner w/biozan to float collar at 10331' MD. 1/21/96: POOH w/nozzle. RDMO CTU & MIRU CT E-line. RU TDT-P & RIH to Icg two passes from 10320' to 9390' MD. POOH w/logging tools & RDMO CT E-line. MIRU CTU. RIH w/perf guns & shot Initial Perforations at: 10170 - 10220' MD 10240 - 10320' MD Used 2-1/8" carriers & shot the perfs at 4 spf. POOH w/perforation guns. 1/22/96: RIH w/nozzle & displaced well to Crude from 8800' to surface. ND BOPS & NU tree. 1/23/96: Secured well & RDMO CTU. Placed the well on production (1/28/96) and obtained a valid welltest. SF RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/1-17A 500292028901 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/26/96 DATE OF SURVEY: 011996 MWD SURVEY JOB NUMBER: AK-MW-60007 KELLY BUSHING ELEV. = 73.00 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9400.00 8894.46 8821.46 9416.00 8907.75 8834.75 9427.77 8917.14 8844.14 9448.07 8932.27 8859.27 9464.00 8943.07 8870.07 32 35 38 45 49 0 41 24 10 24 N 32.00 W .00 1320.31N 1645.79W N 32.00 W 23.06 1327.87N 1650.51W N 32.00 W 23.11 1333.88N 1654.27W N 34.03 W 34.00 1345.21N 1661.65W N 34.00 W 26.49 1354.91N 1668.20W 2079.39 2088.17 2095.17 2108.54 2120.15 9479.14 8952.49 8879.49 53 36 9494.54 8961.22 8888.22 57 17 9509.87 8969.04 8896.04 61 26 9524.74 8975.71 8902.71 65 12 9540.77 8981.95 8908.95 68 59 N 35.61 W 29.02 1364.63N 1674.96W N 33.15 W 27.33 1375.10N 1682.12W N 28.40 W 37.94 1386.43N 1688.85W N 28.93 W 25.55 1398.09N 1695.23W N 28.40 W 23.78 1411.04N 1702.31W 2131.91 2144.49 2157.44 2170.40 2184.79 9557.02 8987.22 8914.22 73 7 9570.24 8990.70 8917.70 76 20 9581.49 8993.16 8920.16 78 24 9612.32 8998.97 8925.97 79 53 9644.97 9004.85 8931.85 79 21 N 25.77 W 29.67 1424.73N 1709.30W N 21.54 W 39.36 1436.40N 1714.41W N 20.14 W 21.90 1446.66N 1718.31W N 16.28 W 13.21 1475.42N 1727.77W N 11.71 W 13.86 1506.57N 1735.54W 2199.67 2211.81 2222.08 2249.88 2278.36 9667.37 9009.04 8936.04 9686.17 9012.56 8939.56 9718.91 9018.36 8945.36 9747.16 9022.66 8949.66 9776.11 9026.22 8953.22 79 5 79 16 80 19 82 10 83 40 N 11.35 W 1.96 1528.13N 1739.94W N 10.30 W 5.57 1546.27N 1743.40W N 9.07 W 4.89 1578.03N 1748.82W N 11.35 W 10.32 1605.51N 1753.77W N 13.11 W 7.93 1633.58N 1759.86W 2297.42 2313.30 2340.68 2364.54 2389.60 9805.56 9029.38 8956.38 84 1 9834.19 9032.43 8959.43 83 45 9862.76 9035.25 8962.25 84 54 9892.79 9037.53 8964.53 86 24 9921.49 9039.00 8966.00 87 42 N 15.75 W 8.99 1661.93N 1767.16W N 17.16 W 4.98 1689.23N 1775.22W N 19.62 W 9.45 1716.21N 1784.19W N 21.02 W 6.82 1744.28N 1794.58W N 23.13 W 8.65 1770.84N 1805.35W 2415.67 2441.46 2467.60 2495.52 2522.54 9952.56 9040.00 8967.00 88 35 9980.16 9040.54 8967.54 89 12 10017.04 9040r93 8967.93 89 33 10045.16 9041.64 8968.64 87 32 10080.46 9043.92 8970.92 85 4 N 25.42 W 7.89 1799.14N 1818.12W N 30.16 W 17.32 1823.54N 1830.98W N 32.45 W 6.28 1855.05N 1850.14W N 34.38 W 9.93 1878.51N 1865.62W N 37.02 W 10.21 1907.11N 1886.17W 2552.20 2579.00 2615.29 2643.11 2678.16 10111.89 9046.47 8973.47 85 35 10144.56 9047.97 8974.97 89 7 10173.39 9048.04 8975.04 90 37 10192.41 9047.95 8974.95 89 54 10224.89 9048.45 8975.45 88 19 N 37.72 W 2.77 1932.01N 1905.18W N 37.55 W 10.79 1957.85N 1925.11W N 40.01 W 9.99 1980.32N 1943.16W N 40.53 W 4.63 1994.83N 1955.46W N 40.89 W 4.99 2019.45N 1976.64W 2709.40 2741.95 2770.75 2789.76 2822.23 S~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/1-17A 500292028901 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/26/96 DATE OF SURVEY: 011996 MWD SURVEY JOB NUMBER: AK-MW-60007 KELLY BUSHING ELEV. = 73.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10251.94 9049.30 8976.30 88 4 N 43.35 W 9.14 10282.33 9050.72 8977.72 86 34 N 44.40 W 6.02 10312.08 9052.48 8979.48 86 39 N 44.93 W 1.80 10331.70 9053.71 8980.71 86 7 N 47.74 W 14.55 10345.00 9054.61 8981.61 86 7 N 47.74 W .00 2039.50N 1994.76W 2849.26 2061.38N 2015.80W 2879.59 2082.50N 2036.68W 2909.24 2096.02N 2050.84W 2928.75 2104.94N 2060.66W 2941.94 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 2945.69 FEET AT NORTH 44 DEG. 23 MIN. WEST AT MD = 10345 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 318.50 DEG. TIE IN POINT 9400' WINDOW POINT 9416' INTERPOLATED DEPTH 10345' "RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/1-17A 500292028901 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/26/96 DATE OF SURVEY: 011996 JOB NUMBER: AK-MW-60007 KELLY BUSHING ELEV. = 73.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9400.00 8894.46 8821.46 10345.00 9054.61 8981.61 1320.31 N 1645.79 W 505.54 2104.94 N 2060.66 W 1290.39 784.85 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP~'~--~Y-SI/N DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU/1-17A 500292028901 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/26/96 DATE OF SURVEY: 011996 JOB NUMBER: AK-MW-60007 KELLY BUSHING ELEV. = 73.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9400.00 8894.46 8821.46 9518.58 8973.00 8900.00 10345.00 9054.61 8981.61 1320.31 N 1645.79 W 505.54 1393.25 N 1692.55 W 545.58 40.04 2104.94 N 2060.66 W 1290.39 744.81 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS 'S ,{RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE oHARED SERVICES DRILLING PBU/1-17A 500292028901 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/26/96 DATE OF SURVEY: 011996 MWD SURVEY JOB NUMBER: AK-MW-60007 KELLY BUSHING ELEV. = 73.00 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DGMN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9400.00 8894.46 8821.46 32 0 9416.00 8907.75 8834.75 35 41 9427.77 8917.14 8844.14 38 24 9448.07 8932.27 8859.27 45 10 9464.00 8943.07 8870.07 49 24 N 32.00 W .00 1320.31N 1645.79W N 32.00 W 23.06 1327.87N 1650.51W N 32.00 W 23.11 1333.88N 1654.27W N 34.03 W 34.00 1345.21N 1661.65W N 34.00 W 26.49 1354.91N 1668.20W 2079.39 2088.17 2095.17 2108.54 2120.15 9479.14 8952.49 8879.49 53 36 9494.54 8961.22 8888.22 57 17 9509.87 8969.04 8896.04 61 26 9524.74 8975.71 8902.71 65 12 9540.77 8981.95 8908.95 68 59 N 35.61 W 29.02 1364.63N 1674.96W N 33.15 W 27.33 1375.10N 1682.12W N 28.40 W 37.94 1386.43N 1688.85W N 28.93 W 25.55 1398.09N 1695.23W N 28.40 W 23.78 1411.04N 1702.31W 2131.91 2144.49 2157.44 2170.40 2184.79 9557.02 8987.22 8914.22 73 7 9570.24 8990.70 8917.70 76 20 9581.49 8993.16 8920.16 78 24 9612.32 8998.97 8925.97 79 53 9644.97 9004.85 8931.85 79 21 N 25.77 W 29.67 1424.73N 1709.30W N 21.54 W 39.36 1436.40N 1714.41W N 20.14 W 21.90 1446.66N 1718.31W N 16.28 W 13.21 1475.42N 1727.77W N 11.71 W 13.86 1506.57N 1735.54W 2199.67 2211.81 2222.08 2249.88 2278.36 9667.37 9009.04 8936.04 79 5 9686.17 9012.56 8939.56 79 16 9718.91 9018.36 8945.36 80 19 9747.16 9022.66 8949.66 82 10 9776.11 9026.22 8953.22 83 40 N 11.35 W 1.96 1528.13N 1739.94W N 10.30 W 5.57 1546.27N 1743.40W N 9.07 W 4.89 1578.03N 1748.82W N 11.35 W 10.32 1605.51N 1753.77W N 13.11 W 7.93 1633.58N 1759.86W 2297.42 2313.30 2340.68 2364.54 2389.60 9805.56 9029.38 8956.38 84 1 9834.19 9032.43 8959.43 83 45 9862.76 9035.25 8962.25 84 54 9892.79 9037.53 8964.53 86 24 9921.49 9039.00 8966.00 87 42 N 15.75 W 8.99 1661.93N 1767.16W N 17.16 W 4.98 1689.23N 1775.22W N 19.62 W 9.45 1716.21N 1784.19W N 21.02 W 6.82 1744.28N 1794.58W N 23.13 W 8.65 1770.84N 1805.35W 2415.67 2441.46 2467.60 2495.52 2522.54 9952.56 9040.00 8967.00 88 35 9980.16 9040.54 8967.54 89 12 10017.04 9040193 8967.93 89 33 10045.16 9041.64 8968.64 87 32 10080.46 9043.92 8970.92 85 4 N 25.42 W 7.89 1799.14N 1818.12W N 30.16 W 17.32 1823.54N 1830.98W N 32.45 W 6.28 1855.05N 1850.14W N 34.38 W 9.93 1878.51N 1865.62W N 37.02 W 10.21 1907.11N 1886.17W 2552.20 2579.00 2615.29 2643.11 2678.16 10111.89 9046.47 8973.47 85 35 10144.56 9047.97 8974.97 89 7 10173.39 9048.04 8975.04 90 37 10192.41 9047.95 8974.95 89 54 10224.89 9048.45 8975.45 88 19 N 37.72 W 2.77 1932.01N 1905.18W N 37.55 W 10.79 1957.85N 1925.11W N 40.01 W 9.99 1980.32N 1943.16W N 40.53 W 4.63 1994.83N 1955.46W N 40.89 W 4.99 2019.45N 1976.64W 2709.40 2741.95 2770.75 2789.76 2822.23 ~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 ~HARED SERVICES DRILLING PBU/1-17A 500292028901 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/26/96 DATE OF SURVEY: 011996 MWD SURVEY JOB NUMBER: AK-MW-60007 KELLY BUSHING ELEV. = 73.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10251.94 9049.30 8976.30 88 4 N 43.35 W 9.14 10282.33 9050.72 8977.72 86 34 N 44.40 W 6.02 10312.08 9052.48 8979.48 86 39 N 44.93 W 1.80 10331.70 9053.71 8980.71 86 7 N 47.74 W 14.55 10345.00 9054.61 8981.61 86 7 N 47.74 W .00 2039.50N 1994.76W 2849.26 2061.38N 2015.80W 2879.59 2082.50N 2036.68W 2909.24 2096.02N 2050.84W 2928.75 2104.94N 2060.66W 2941.94 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 2945.69 FEET AT NORTH 44 DEG. 23 MIN. WEST AT MD = 10345 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 318.50 DEG. TIE IN POINT 9400' WINDOW POINT 9416' INTERPOLATED DEPTH 10345' ~S °tRY-SUN DRILLING SERVICES ANCHORAGE DJ_J~S KA PAGE 3 SHARED SERVICES DRILLING PBU/1-17A 500292028901 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/26/96 DATE OF SURVEY: 011996 JOB NUMBER: AK-MW-60007 KELLY BUSHING ELEV. = 73.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVI) VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9400.00 8894.46 8821.46 10345.00 9054.61 8981.61 1320.31 N 1645.79 W 505.54 2104.94 N 2060.66 W 1290.39 784.85 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. >RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU/1-17A 500292028901 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/26/96 DATE OF SURVEY: 011996 JOB NUMBER: AK-MW-60007 KELLY BUSHING ELEV. = 73.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9400.00 9518.58 10345.00 8894.46 8821.46 8973.00 8900.00 9054.61 8981.61 1320.31 N 1645.79 W 505.54 1393.25 N 1692.55 W 545.58 40.04 2104.94 N 2060.66 W 1290.39 744.81 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS February 27, 1996 AOGCC Larry Grant 3001 Porcupine Dr Anchorage, AK 99501 Re: Redistribution of Survey Data 1-17A Dear Mr. Grant, The following survey data is being redistributed due to a typographical error on my part affecting the true vertical depth and the sub-sea vertical depth. Please destroy the data from these wells that was sent to you on 2/22/96 and replace with the following. Enclosed are two hard copies of the above mentioned file(s). Well 1-17A MWD survey, tie in point 9400', window point 9416', interpolated depth 10345' Please call me at 563-3256 if you have any questions or concerns. Regards, Sandral'ufldn Dept. Specialist Attachments. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10053 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 3/4/96 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia Survey Performance Disk Calculation Letter D.S. 1-17A ¢1~--1~2. 96042 DUAL BURSTTDT-P 960121 1 D.S. 15-1 $A-oo6 96043 DUAL BURSTTDT-P BORAX 96011 6 1 D.S. 4-45 'R~.-/- 0.Z'~ 95015 DUAL BURSTTDT-P BORAX 941212 1 D.S. 5-4 7~1- (~5'f~ 96035 DUAL BURSTTDT-P 9601 29 1 D.S. 5-25 o>~/-/¢1 96040 DUAL BURSTTDT-P BORAX 960126 1 S I G N E D' ~ ~~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. Gas Cons. Commissio~ Ar~chor,age ri FI I I_1_ I I~ CS February 22, 1996 AOGCC Larry Grant 3001 Porcupine Dr Anchorage, AK 99501 Re: Survey Data 1-17A, 7-6A, 15-42, 18-lA Dear Mr. Grant, Enclosed are two hard copies of the above mentioned file(s). Well 1-17A Well 7-6A MWD survey, tie in point 9400', window point 9416', interpolated depth 10345' MWD survey, tie in point 9200', window point 9253', interpolated depth 10123' MWD survey, surface to 10048' Well 15-42PB2 Well 15-42PB3 MWD survey, tie in point 9542.86' kickoff point 9550', interpolated depth 9851' MWD survey, tie in poim 9737.1', window poim 9769.59', interpolated depth 9884' Well 15-42 MWD survey, tie in point 9737.1, kickoff point 9755', interpolated depth 11590' Well 18-lA MWD survey, tie in point 10500' window point 10636', imerpolated depth q~ '[i~ 11242' Please call me at 563-3256 if you have any questions or concerns. Regards, Sandr~/Lufkin Dept. Specialist A~achments. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 , Fax (907) 563-7252 A Dresser Industries, Inc. Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10037 Company: 2/2O/96 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Well Job # Log Description Date BL Prudhoe Bay Floppy RF Sepia DIR MWD Disk D.S. 2-15 ~)---(~ TDT-PBORAXWITHTEMP/PRESS '960120 I 1 D.S. 3-4 '~ ~-- ~ ! STATIC PRESSURE SURVEY 9 6 01 2 5 I 1 D.S. 5-16A c/, ~ ../~ LEAK DETECTION LOG 960124 I 1 D.S. 6-10 '~ - ~ PRODUCTION PROFILE 9 6 01 2 3 I 1 D.S. 16-19 ~'-'c~/~ LEAK DETECTION LOG 9601 25 I I SIGNED: Please sign and return one copy of this transmittal to Sherrie at the. above address. Thank you. DATE: Aritho;age TONY KNOWLE$, GOVERIVOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 November 22, 1995 Jim Abel, Engineering Supervisor ARCO Alaska Inc P O Box 100360 Anchorage, AK 99510-0360 Re: Well # Company Permit # Surf Loc Btmhole Loc Prudhoe Bay Unit 1-17A ' ARCO Alaska Inc 95-182 191'S & 646'E of NW cr Sec 08, T10N-, R15E, UM 1828'FSL, 1403'FEL, Sec 06, T1 ON, R15E, UM Dear Mr. Abel: Enclosed is the approved application for permit to re-drill the above referenced well. The permit to re-drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting re-drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling a new hole. Notice may be given by contacting the Commission's petroleum field inspector on the North Slope pager at 659-3607. Chairman ~ .......... BY ORDER OF THE OMMISSION jo/encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISS,,JN PERMIT TO DRILL 20 AAC 25.005 a. Type of Work Drill m Redrill X lb. Type of Well Exploratory__ Stratigraphic Test . Development Oil .~. Re-Entrym Deepen m Service _ Development Gas ~ Single Zone _.[. Multiple Zone _ 2.. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 73' ~. Address 6. Property Designation P. O. Box 100360, Anchorage, AK 99510-0360 ADL 28329 Prudhoe Ba¥/Prudhoe Bay Oil 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 191' S & 646' E of NW cr Sec 8, T10N, R15E, UM. Prudhoe Bav Unit Statewide At top of productive interval 8. Well number Number 1003' N & 924' W of SE cr Sec 6, T10N, R15E, UM. 1-1 7A #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 1828' FSL & 1403' FEL, Sec 6, T10N, R15E, UM. November 19, 1995 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line No Close Approach 10250' MD / 9055' TVD 16. To be completed for deviated wells 17. Anticipated pr~e 20 AAC 25.035(e)(2)) kickoff depth 9415' MD Maximum hole anc~le 87° Maximum surface(' ~"'"",, 2800 psig ) At total depth {TVDI ~ 18. Casing program Setting Depth size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include sta~le dataI 3-3/4" 2-7/8" 6.4 L80 FL4S 1410' 8840' 8410' 10250' 9055' 30 bbls 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 9900 feet Plugs(measured) PBTD tagged at 9792' MD (9/9/95). true vertical 9315 feet Effective depth: measured 9792 feet Junk (measured) true vedical 9224 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor I 1 9' 2 0" 250 Sx Arcticset 1 1 9' 1 1 9' Surface 2631 ' 13-3/8" 5800 Sx PF II 2704' 2704' Production 9787' 9-5/8" 960 Sx CIG 9860' 9281' i :., .' .~ ',..' '~'i '-: .i Perforation depth: measured 9514 - 9526'; 9566 - 9596'; 9604 - 9610' true vertical 8991 - 9001'; 9035 - 9060'; 9067 - 9072' 20. Attachments Filing fee ~ Property plat _ BOP Sketch ~ Diverter Sketch _ Drilling program ~ Drilling fluid program __ Time vs depth plot _ Refraction analysis _ Seabed report _20 AAC 25.050 requirements _ 21. I hereby certify that the foregoing is true and correct to the best of my knowledge C)' Titlle Engineering Supervisor Date II Iq Icj.5~-- Sig ~ Commission Use Only Permit-~umber~",-~' -r"' ¢~' ~--, IAPInumber - -~ 5 0- ~'~- ~ -- "~" ~ "~-- ~ ~'-~:~/I I Approval (;late /,., ..._ //f/?...'7...f~'- ISee c°ver letter f°rother Conditions of approval Samples required __Y e s ~ N o Mud log r' quired __ Y e s ~ N oreC{uirements Hydrogen sulfide measures ~ Y e s ~ N o Directional survey required .~ Yes N o - Required working pressure for BOPE ~ 2M; ~ 3 M · ~ 5 M · ~ 1 0 M · ~ 1 5 M 3500 psi for CTU Other: i-JJ'J 0j cq.J Sign. ed By Approved by i~aVi~ W, J0hr]st0r~ Commissioner the commission Date /'/' 7... ~ Form 10-401 Rev. 7-24-89 Submit in triplica DS 1-17A CT Sidetrack and Completion Intended Procedure Obiective: Plugback existing wellbore. Di~ectionally drill a high angle twin well from the existing wellbore. Complete with 2-7/8" cemented liner. Intended Procedure- Cement squeeze the current perforations and plugback the existing completion to - 9375' md. Mill window in 9-5/8" casing at -9415' md. Drill 10' of formation and perform a formation test to an equivalent mud we~ight of at least.~5 ppg over the highest a'nticipated mud weight. Build angle t0 87° at 29°/100' to · Directionally drill twin well to access Zone 2B reserves. · Run open hole logs. · Run and cement 2-7/8" liner to TD. · Perforate selected intervals. · Return well to production. November 16, 1995 5-1/2" Sliding Sleeve 5-1/2" DB-5 Nipple 9-5/8" SAB Pkr. 4-1/2" DB-6 nipple 3.813" ID 4-1/2" Tubing tail DS 1 - 1 7A PROPOSED CTD COMPLETION 2209' 5-1/2" Tubing 5-1/2" Camco Bal-O SSSV Nipple (4.562" ID) 8591' 8666' 8774' 8843' 8888' 4-1/2" GS FN on top of liner @ +_8843' Window Cut in 9-5/8" casing with CT. ~ 9415' - 9422' 3-3/4" Open hole 2-7/8" FL4S liner Original perforations cement sqz'd. TD @ + 10250' 9-5/8" Casing Shoe @ Well Name Loca:ion ARCO ALASKA 1-%7 sidetrack no. 1 1-17 SIDETRACK PRUDHOE BAY, ALASKA Page 1 of 1 Date Nov. 14. 1995 Filename : 1-175T12 No.Interpolation Height of Pla=formDa~umab°we Ckls=oma~r Datum Height of Well Da~umabove. Pla~formDaUum 0.00 Ail T~Ds are relative :to =he-Well Da=um Level MD ~C D~R SS D~ ~PN/S ~oo.oo ~.~ ~.~ ~?.9o 9~o~6..? ~.~ 70.0 3z~.5 8888.~ 9~o9o.~5 9500.00 ~0.0 ~2%.5 8866.25 942107.1 9600.00 70.0 324.5 8900.44 942183.6 9700.00 70.0 32%.5 8934.64 942260~1 9730.30 .70.0 324.5 8945.00 942283.3 9786.41 86.8 324.4 8956.23 942327:.8 9800.00 86.8 324.4 8956.98 9423~8~.9 9900.00 86.8 ~2A.4 8962.50 942420-.0 !0000.00 86.8 324.4 8968.03- 942501'.2 10100.00 86.8 32~.~ 8973.~6 942582.4 10200.00 86.8 324.4 8979.08 942663'5 10216.62 86.8 32~.4 8980.00 942677-0 0.00 f: ft ASP N/S D'LEG f= ~/100 -G96329.6 0.0 696321.5 29.9 696312.~ 30.0 696273.9 30.0 696262.1 0.0 BUILD TURN ~/100 °/100 0.0 0.0 28.4 -16.1 30.0 0.0 30.0 0.0 0.0 0.0 696207 . 6 0.0 0.0 0.0 696153.0 0.0 0.0 0.0 696136.4 0.0 0.0 0.0 696104.6 30.0 30.0 -0.2 696096.7 0.0 0.0 0.0 696038.6 0.0 0.0 0.0 695980.4 0.0 O. 0 O. 0 695922 · 3 O. 0 O. 0 O. 0 695864.1 0.0 0.0 0.0 695854.4 0.0 0 · 0 0.0 Origin of Bo=corn =-ole Closure PLATPORM-C~ITRE Bottom Hole Closure %1171688 ft 36.4~, I. fell Na~¥' Location 9352,00 9376 9400.00 9478.32 9500. ,~0 9700,00 9730.3.0 9786.41 9800. O0 · . 9900.00 10000.0.0 10100. o2o.o. 0.o 10216 I ! A~CO ALASKA 1-17 side=rack no. 1 1-~_7 SIDETRACK PRUDHOE ~AY, ALASKA P.2/5 No Interpolation 'l Height of Platform Dat~n above.,:Cus~omer Datum Height of Well Datum above ~lat~orm Datum 0.00 All TVDs are relative ~o the Well Datum Level Page 1 of 1 Date NOv. !4, 1995 Fi!ename ; 1-17ST1 O. 00 ft ft /100 ~/100 o.o 0.0. 28.4 -16.1 30.0 0.0 30.0 0.0 0.0 0.0 I .. - INC DIR SS DEPTH I N/S · ' E/W VS D'!~RG BUILD de~ deg ft ! f~ ft ft °/!O0 32.5 328.5 8780.95 12~9.2 '.1632.3 1966.7 0.0 39.6 324.5 8801.04 I3~1,3-"1640.4 1981.3 29.9 46.5 324.5 8817.90 13~4.1 -1649.5 1997.1 30.0 70.0 324.5 885~.82 1378.0 -1687.9 2063.1 30.0 70'.0 324.5 8866.23 1394.6 ~1699.8 2083.4 0.0 70.0 324.5 8900.44 14~1.1 1754.3 2177.2 0.0 70.0 324,5 8934.64 i5~7.6 -1808.9 2271.0 0.0 70.0 324.5 8945,00 15~0.8 -1825.4 2299.4 0.0 86,8 324.4 8956.23 16~5.3 ~-1857.3 2354,1 30.0 86.8 324.4 8956.98 I6~6.4 -1865.2 2367.6 0.0 · 86.8 324.4 8962.50 1707.6 -1923'3 2467.3 0.0 86.8 324.4 8968.03 17188.8 -1881.% 2566.9 0.0 86.8 324.4 8973.55 18!70,0 '2039.5 2666.6 0.0 86.8 324.4 $979.08 19151.2 -2097.6 2766.2 0.0 86.8 324.4 8980.00 19164.8 -2107.3 2782.9 0.0 0.0 0.0 o.0 0.0 0.0 0,0 30.0 -0,1 o.0 0.0 o .0 0.0 0.'0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Origin o.~' Bottom Hole Closure PLATFORM CENTRE Bottom H01e Closure 2881 ft ~13.0~ =. ~ 6000 GSO0- '. 7000 m ~ 8000 - ~ooo, _- I8.L IlL '1-17 SIiIIilNI ~"111~ VlE~- ' 1- 7S'1I · 1-i7REL '. ANE OF VERT SECTn 328,00" /// ,5~4~ $$ Yep t i cai Sec +. ion Scale'l inch : 500 ft B 8 8 15:53 ~RILEX ANCHORAGE IEL ND. i-t7 SIOEIRM~ tmRIZIB?AL/PLAN VIEW : ~l~r~ - ' _,q__ P. 5,"5 t Depar,~,~e Sca~e 1. i nci'~. ~ 200 £~ PLANE OF VERT SECT:n 328 _ 20O0 18oo ~ 1600 -- ! 400 1200 .00° Shop Fuel Boilers Water Mud 60/40 I Trplx [ Ext. Pump R~')m Pipe rack Ext. Dowell Drilling Equipment Trailer Preferred Major Equipment Layout for CT Drilling in DS 1-17A · T Drilling Wellhead Detail ~ CT Injector Head Methanol Injection Otis 7' WLA Quick Connect ~ 4-1/16" ID CT BOP Stack ~ r--"--- 10,000 psiWorking Pressure ~.~ Flanged Fire Resistant Kelly Hose To Dual ChokeManifold Flanged / / Manual Valve HCR ~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure -- 7 R~ser i 2" Pump-In ~ Blind Rams or Combination Cutter/Blinds Cutters or Combination Cutter/Blinds Slip rams Pipe rams Drilling spool 7-1/16", 5M by 4-1/16", 10M .~ Annular BOP (Hydril),7-1/16" ID 5,000 psi working pressure Alignment Guide Flan( Ram Type Dual Gate BOPE~ Manual over Hydraulic 7-1/16" ID with Pipe/Slip Rams Manual Valves (3-1/2' Valves) 9' from GL to top of MV 0.458' (5.5") ri /Tubing Hanger 9-5/8" Annulus 13-3/8" Annulus ~Fire Resistant Kelly Hose to Flange by Hammer Up 1/4 Turn Valve on DS Hardline 10' from Tree ALASKA O~AND GAS CONSERVATION COMI~,~'-SSION APPLICA'i_ .)N FOR SUNDRY APl=. .OVALS 1. Type of Request: Abandon X Suspend Operation shutdown Re-enter suspended well Atter casing Repair well Plugging X Time extension Stlmulat~ Change approved program Pull tubing Vadance Perforate 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-036(~ 4. Location of well at surface 191' S & 646' E of NW cr, Sec. 8, T10N, R15E, UM. At top of productive interval 1003' N & 924' W of SE cr, Sec. 6, T10N, R15E, UM. At effective depth At total depth 1357' N & 1144' W of SE cr, Sec. 6, T10N, R15E, UM. 5. Type of Well Development Exploratory Stratlgraphic Service DUPLICATE (~he'r 6. Datum of elevation(DF or KB) 73' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 1-17 9. Permit number 78-9 10. APl number 50 - 029-20289 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical _ EffectiVe depth: measured true vertiCal 9900 feet Plugs(measured) PBTD Tagged @ 9792' MD (9/9/95) 9315 feet 9792 feet 9224 feet ' junk(measured) Casing. Conductor- Surface Production Perforation depth: Length Size 119' 20" 2631' 13-3/8" 9787' .9-5/8" Cemented 250 Sx Arctic Set · 5800 Sx PF Ii 960 Sx Cl G measured 9514 - 9526'; 9566 - 9596'; 9604 - 9610' true vertical 8991 - 9001,; 9035 - 9060'; 9067 - 9072' Measured depth 119' 2704' 9860' True vertical depth 119' 2704' 9281' NOV 'i :.~ i995 ~il & 6as Cons. Commission "-'~ ~,nch0rage- Tubing (siZe,-grade, and measured depth) 5-1/2"; 17#, N-80, NPCT @ 8786' MD; 4-1/2", 12.6:~, N-80, NPCT @ 8896' MD. . ... · Packers and SSSV (type'and measured depth) Baker SAD PaCker @ 8774; MD; camco BaI-O SSSV @ 2209' MD. 13. Attachments -- Description summary of proposal. ~ -Detailed Operations program BOP sketch - x 14. Estimated date for commencing operation - - . :' 15. Status of well classification as: ' - ' Oil X ' Gas SusPended 16. If proposal was:: verbally_ .~. approved' ~.~ - '- "':'~ - - Name of Date Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. . .. : ..' . _ - . -. ~.. _?.. . . . Signed ~,,X.~- "~/ -~" - ' Title '. Engineering SuPerVisor Date // /,.~ -- COMa Ss o. Conditions of approval: Notify Commission so representative may witness ' . . --'' - .'.-' J. Approval No~c..- Plug integrity BOP Test ' Location clearance ___.,-'~ . I /,..~ ' Mechanical IntegritY-Test . Subsequent form required.l.0- ~c~ _,~,proVed CoPY-: -: . ' '" . · - ' -' -;~' _Re~tUrne.d ' "'. : ~. ' . ~ - . drlg,'nal~'signed.:By;~:-- .~..: .~-. ',:__/://?,4~,/,?5"' ' ' .... -. ApproVed b~/order of the commissioner ' "Davfd W. ;JohnStorl - '-- c'or:nf'nissi(:{ner ' - Date .. Form lO-403.Rev 06/15/88 - - ' ...... -~. ':~'-.:';-'-' ;" ' '--'- ' ': --:- WELL PERMIT CHECKLIST com:,~m-Y INIT CLASS WELL NAME GEOL AREA UN~T# PROGRAM: exp [] dev [] redrll~ aery [] ADMINISTRATION 2. 3. 4. 5. 6. 10. 11. 12. 13. Permit fee attached .................. N Lease number appropriate ............... N Unique well name and number .............. N Well located in a defined pool ............. N Well located proper distance from drlg unit boundary. · N Well located proper distance from other wells ..... N Sufficient acreage available in drilling unit ..... N If deviated, is wellbore plat included ........ N Operator only affected party .............. N Operator has appropriate bond in force ......... N Permit can be issued without conservation order .... N Permit can be issued without administrative approval.. N Can permit be approved before 15-day wait ....... N ENGINEERING APPR 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. D,%T~ 26. I~_~) 27. 28. 29. Conductor string provided ................ Y N Surface casing protects all known USDWs'. ........ Y N CMT vol adequate to circula~e on conductor & surf csg.. Y N CM~ vol adequate to tie-in long string to surf csg . . .,-~Y N CMT will cover all known productive horizons ...... ~ N Casing designs adequate for C, T, B & permafrost .... .~ N Adequate tankage or reserve pit ............ N If a re-drill, has a 10-403 for abndnmnt been approved. N Adequate wellbore separation proposed ......... N If diverter required, is it adequate .......... Drilling fluid program schematic & equip list adequate .~ N BOPEs adequate .................. BOPE press rating adequate; test to ~X~) s g N Choke manifold complies w/API RP-53 (May 84) ...... Work will occur without operation shutdown ....... ~ N · Is presence of H2S gas probable ............ Q~ N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y N/ 31. Data presented on potential overpressure zones ..... 32. Seismic analysis gf shallow gas zones .......... 33. Seabed condition survey (if off-shore) ........ /Y N ' - 34. Con~act neme/phone for weekly progress reports . . . /. Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: C~mmentm/Instructions: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ****************************** * ............................ ....... SCHLUMBERGER * ............................ ****************************** COMPANY NAME WELL NAME FIELD NAME BOROUGH S TA TE API NUMBER REFERENCE NO : ARCO ALASKA INC. : DS 1-17A : PRUDHOE BAY · NORTH SLOPE · ALASKA : 500292028901 : 96042 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE · 97/02/27 ORIGIN · FLIC REEL NAME · 96042 CONTINUATION # : PREVIOUS REEL CO~2VENT : ARCO ALASKA INC, DS 1-17A, PRUDHOE BAY, 50-029-20289-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/02/27 ORIGIN . FLIC TAPE NAME : 96042 CONTINUATION # : 1 PREVIOUS TAPE : CO~4~NT : ARCO ALASKA INC, DS 1-17A, PRUDHOE BAY, 50-029-20289-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: DS 1 - 17A API NUMBER: 500292028901 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 27-FEB-97 JOB ~ER: 96042 LOGGING ENGINEER: G. JOHNSON OPERATOR WITNESS: G. GOODRICH SURFACE LOCATION SECTION: 8 TOWNSHIP: 1 ON RANGE: 15E FNL: 191 FSL: FEL: FWL: 646 ELEVATION (FT FROM MSL O) KELLY BUSHING: 73. O0 DERRICK FLOOR: 72. O0 GROUND LEVEL: 34. O0 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 9. 625 9420.0 47. O0 2ND STRING 2. 875 10345. 0 6.50 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP RENULRJ<S: NO BASE GAI~MA RAY IS AVAILABLE TO DEPTH CORRECT SIDETRACK TDTP DATA. ONLY 2 TDTP MONITOR PASSES WERE LOGGED ON THIS SIDETRACK. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION · O01CO1 DATE · 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10292.0 9403.0 TDTP 10320.0 9403.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP REMARKS: This file contains TDTP Pass #1 (Base Pass #1). No pass to pass shifts were applied to this data. LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 1-17A Well Name APIN 500292028901 API Serial Number FL 0191 FNL & 0646 FWL Field Location SECT 8 S e c t i on TOWN 1 ON Township RANG 15E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nat i on WITN G. GOODRICH Witness Name SON 500297 Service Order Number PDAT MSL Permanent da turn EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 73. Above Permanent Datum EF~B FT 73. Elevation of Kelly Bushing EDF FT 72. Elevation of Derrick Floor EGL FT 34. Elevation of Ground Level TDD FT 10345. Total Depth - Driller BLI FT 10320. Bottom Log Interval TLI FT 9403. Top Log Interval DFT FLO-PRO Drilling Fluid Type DFD G/C3 8.9 Drilling Fluid Density TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRAT SDSI BACK FBAC TCAN TCAF Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector Total counts analyzed - near detector (TDTP) Total counts analyzed - far detector (TDTP) LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: DEFI TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector LCO1 Local Computation 1 GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 2 3 4 5 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 92 66 1 66 0.5 FT 11 0 FT 68 1 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500297 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM TDTP CU 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 500297 O0 000 O0 0 1 1 1 4 68 0000000000 SBHF TDTP CU 500297 O0 000 O0 0 1 1 1 4 68 0000000000 EBHNTDTP CU 500297 O0 000 O0 0 1 1 1 4 68 0000000000 SIGC TDTP CU 500297 O0 000 O0 0 1 1 1 4 68 0000000000 SIBH TDTP CU 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TRAT TDTP 500297 O0 000 O0 0 1 1 1 4 68 0000000000 SDSI TDTP CU 500297 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: NA2VZE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) BACK TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TCAF TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TCND TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TCFD TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TSCN TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TSCF TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 INFD TDTP CPS 500297 O0 000 O0 0 1 1 1 4 68 0000000000 LCO1 TDTP 500297 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH TDTP GAPI 500297 O0 000 O0 0 1 1 1 4 68 0000000000 TENS TDTP LB 500297 O0 000 O0 0 1 1 1 4 68 0000000000 CCL TDTP V 500297 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10320. 000 SIGM. TDTP 15.118 TPHI. TDTP 28.198 SBHF. TDTP 32. 328 SBHN. TDTP 46.105 SIGC. TDTP 0. 615 SIBH. TDTP 92.170 TRAT. TDTP 1. 971 SDSI.TDTP 0.151 BACK. TDTP 72.021 FBAC. TDTP 20.468 TCAN. TDTP 178019.219 TCAF. TDTP 71910. 516 TCND. TDTP 33024. 336 TCFD. TDTP 10840. 309 TSCN. TDTP 12820. 918 TSCF. TDTP 5178. 984 INND. TDTP 1994 . 412 INFD. TDTP 292. 293 LCO1 . TDTP 2. 476 GRCH. TDTP -999. 250 TENS. TDTP -5010. 000 CCL. TDTP 0. 000 DEPT. 9403. 000 SIGM. TDTP 11 . 552 TPHI. TDTP 15. 607 SBHF. TDTP 34. 503 SBHN. TDTP 48. 824 SIGC. TDTP 1. 598 SIBH. TDTP 85. 856 TRAT. TDTP 1. 566 SDSI. TDTP O. 193 BACK. TDTP 235. 085 FBAC. TDTP 42. 523 TCAN. TDTP 54546. 422 TCAF. TDTP 27348. 938 TCND. TDTP 20803. 070 TCFD. TDTP 6770. 812 TSCN. TDTP 5404 . 720 TSCF. TDTP 2709. 863 INND. TDTP 1673 . 929 INFD. TDTP 259. 939 LCO1 . TDTP 1 . 994 GRCH. TDTP 17. 781 TENS. TDTP -5025. 000 CCL. TDTP O. 000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/27 MAX REC SIZE : 1024. FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10293.0 9403.0 TDTP 10320.0 9403.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP 88888.0 88888.0 88889.0 10307.5 10308.5 10303.5 10304.0 10299.5 10300.0 10295.5 10296.5 10291.5 10292.0 10287.5 10289.5 10283.5 10285.5 10279.5 10280.5 10275.5 10275.5 10271 . 5 10271 . 0 10267.5 10268.0 10263 . 5 10264.5 10259.5 10261 . 0 10255.5 10256.0 10250.5 10250.5 10247.5 10248.0 10246.5 10245.5 10243 . 5 10245.5 10242.5 10241 . 5 10239.5 10241.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 10238.5 10235.5 10234.5 10231.5 10230.5 10227.5 10226.5 10223.5 10222.5 10219.5 10218.5 10214.5 10210.5 10207.5 10203 5 10199 5 10195 5 10183 5 10179 5 10178 5 10175.5 10174.5 10171.5 10170.5 10167.5 10163.5 10159.5 10158.5 10155.5 10154.5 1 O151.5 10147.5 10146.5 10143.5 10142.5 10139.5 10138.5 10135.5 10131.5 10127.5 10126.5 1 O123.5 10122.5 10119.5 10111.5 10110.5 10107.5 10106.5 10103.5 10102.5 10098.5 10095.5 10094.5 10091.5 10087.5 10239.5 10234.5 10230.5 10225.5 10222.5 10218.5 10214.0 10210.5 10178.5 10174.0 10170.5 10158.5 10154.0 10146.0 10142.5 10138.0 10126.0 10122.5 10110.5 10107.0 10102.5 10098.5 10095.0 10236.0 10232.5 10227.5 10222.5 10220.0 10208.0 10203.0 10199. 0 10195.5 10183.5 10179.0 10174.5 10171.0 10167.5 10164.5 10160.0 10155.5 1 O151.5 10148.0 10143.5 10139.0 10135.0 10131.5 10127.5 10124.5 10119.5 10111.5 10108.0 10103.5 10095.5 10093.5 10087.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 10079.5 10079.0 10075.5 10075.5 10071.5 10071.5 10067.5 10068.0 10063.5 10063.5 10062.5 10063.0 10058.5 10059.5 10055.5 10055.5 10054.5 10055.0 10051.5 10052.0 10050.5 10051.0 10047.5 10048.0 10046.5 10046.0 10043.5 10043.5 10042.5 10042.5 10039.5 10039.5 10035.5 10035.0 10031.5 10031.5 10026.5 10026.5 10023.5 10023.5 10022.5 10023.0 10019.5 10019.0 10018.5 10019.5 10015.5 10015.0 10014.5 10015.0 10011.5 10012.0 10007.5 10007.5 10006.5 10007.0 10002.5 10003.5 9994.5 9995.5 9991.5 9991.5 9990.5 9992.5 9987.5 9988.0 9986.5 9988.0 9983.5 9984.0 9979.5 9980.5 9978.5 9980.0 9975.5 9975.5 9974.5 9975.5 9971.5 9971.0 9970.5 9971.5 9967.5 9967.0- 9966.5 9968.0 9963.5 9963.5 9962.5 9964.0 9959.5 9959.5 9958.5 9959.0 9955.5 9955.0 9951.5 9951.5 9950.5 9951.0 9946.5 9948.0 9943.5 9943.5 9942.5 9944.0 9939.5 9939.0 9938.5 9939.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 9935.5 9931.5 9927.5 9923.5 9922.5 9919 5 9918 5 9915 5 9911 5 9907 5 9903 5 9899 5 9895.5 9891.5 9887.5 9883.5 9882.5 9879.5 9878.5 9875.5 9874.5 9871.5 9870.5 9867.5 9863.5 9859.5 9855.5 9851.5 9843.5 9839.5 9835.5 9831.5 9827.5 9823.5 9819.5 9815.5 9810.5 9806.5 9802.5 9799.5 9795.5 9794.5 9791.5 9790.5 9787.5 9786.5 9783.5 9779.5 9775.5 9767.5 9763.5 9759.5 9755.5 9751.5 9747.5 9923.5 9919.0 9883.0 9878.5 9875.0 9870.5 9810.5 9806.0 9802.5 9794.5 9790.0 9786.5 9934.5 9930.5 9927.5 9924.0 9919.5 9915.5 9911.0 9907.5 9904 0 9899 5 9896 0 9893 0 9887 0 9883 0 9879.5 9876.0 9873.5 9868.0 9863.5 9860.5 9856.0 9852.0 9843.0 9841.5 9835.5 9831.0 9827.0 9823.5 9818.5 9816.0 9800.0 9796.5 9792.5 9788.0 9783.5 9779.5 9776.0 9768.0 9763.5 9759.0 9755.5 9751.0 9748.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 10 9739.5 9735.5 9734.5 9731.5 973 O. 5 9727 5 9726 5 9723 5 9715 5 9711 5 9707 5 9703 5 9699.5 9695.5 9691.5 9687.5 9683.5 9679.5 9675.5 9671.5 9667.5 9663.5 9659.5 9651.5 9647.5 9643.5 9639.5 9635.5 9631.5 9630.5 9627.5 9626.5 9623.5 9622.5 9618.5 9614.5 9611.5 961 O. 5 9607.5 9606.5 9599.5 9595.5 9591.5 9587.5 9583.5 9582.5 9579.5 9578.5 9575.5 9574.5 9571.5 9567.5 9563.5 9559.5 9555.5 9734.5 9731.0 9726.5 9630.5 9626.0 9622.5 9619. 0 9615. 0 9610.5 9607.0 9583. 0 9578.5 9575. 0 9740.0 9735.5 9731.0 9726.5 9723. 0 9715.0 9712.0 9708.0 9704.5 9700.0 9697.0 9692.5 9687.0 9683 5 9680 0 9675 0 9671 5 9667 0 9664 0 9659 5 9651 5 9648 5 9644 0 9639.5 9635.0 9631.0 9626.5 9624.0 9612.0 9606.5 9598.5 9595.0 9591.5 9587.0 9584.0 9580.5 9576.0 9572.5 9568.0 9564.5 9560.0 9556.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 11 9551 5 9547 5 9543 5 9539 5 9523 5 9519 5 9515 5 9514 5 9511.5 9510.5 9506.5 9502.5 9498.5 9494.5 9491.5 9490.5 9487.5 9486.5 9479.5 9475.5 9471.5 9447.5 9443.5 9439.5 9435.5 9431.5 9427.5 9423.5 100.0 $ REMARKS: 9551.5 9546.5 9543.0 9539.5 9523.5 9520.0 9515.0 9515.0 9511.5 9510.5 9506.5 9502.0 9498.0 9494.5 9491.5 9490.0 9488.5 9486.5 9480.5 9475.0 9471.5 9447.5 9444.0 9440.0 9435.5 9431.5 9428.0 9423.5 100.0 100.0 This file contains TDTP Pass #2 (Base Pass #2). The depth shifts shown above relect GRCH Pass #2 to GRCH Pass #1 and SIGM Pass #2 to SIGM Pass #1. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI CN FN WN APIN FL SECT TOWN RANG COUN STAT NATI VAL U ARCO ALASKA INC. PRUDHOE BAY DS 1-17A 500292028901 0191 FNL & 0646 FWL 8 1 ON 1SE NORTH SLOPE ALASKA USA DEFI Company Name Field Name Well Name API Serial Number Field Location Section Township Range County State or Province Nation LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 12 TUNI VALU DEFI WITN G. GOODRICH SON 500297 PDA T MSL EPD FT O . LMF RKB APD FT 73. EKB FT 73. EDF FT 72. EGL FT 34. TDD FT 10345. BLI FT 10320. TLI FT 9403. DFT FLO- PRO DFD G/C3 8.9 Wi tness Name Service Order Number Permanent datum Elevation of Permanent Datum Log Measured From Above Permanent Datum Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Total Depth ~ Driller Bottom Log Interval Top Log Interval Drilling Fluid Type Drilling Fluid Density TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector LCO1 Local Computation 1 GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 13 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500297 O0 000 O0 0 2 1 1 4 68 0000000000 SIGM TDTP CU 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 500297 O0 000 O0 0 2 1 1 4 68 0000000000 SBHF TDTP CU 500297 O0 000 O0 0 2 1 1 4 68 0000000000 SBHN TDTP CU 500297 O0 000 O0 0 2 1 1 4 68 0000000000 SIGC TDTP CU 500297 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH TDTP CU 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT TDTP 500297 O0 000 O0 0 2 1 1 4 68 0000000000 SDSI TD~P CU 500297 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TSCF TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 INND TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 500297 O0 000 O0 0 2 1 1 4 68 0000000000 LCO1 TDTP 500297 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 500297 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 500297 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 500297 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 14 ** DATA ** DEPT. 10321 SBHN. TDTP 39 SDSI.TDTP 0 TCAF. TDTP 55348 TSCF. TDTP 5131 GRCH. TDTP -999 000 SIGM. TDTP 13 . 310 TPHI. TDTP 28. 832 SBHF. TDTP 27. 142 471 SIGC. TDTP 2. 021 SIBH. TDTP 64 . 323 TRAT. TDTP 2. 071 149 BACK. TDTP 192. 991 FBAC. TDTP 37. 363 TCAN. TDTP 144745. 469 570 TCND. TDTP 33458. 813 TCFD. TDTP 10762. 242 TSCN. TDTP 13419. 453 404 INND. TDTP 1889. 363 INFD. TDTP 302. 966 LCO1 . TDTP 2. 615 250 TENS. TDTP -5030. 000 CCL. TDTP O. 000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2 TDTP REMARKS: The arithmetic average of passes 1 & 2 was computed after all depth shifts and clipping was applied. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 15 TABLE TYPE : CONS TONI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 1-17A Well Name APIN 500292028901 API Serial Number FL 0191 FNL & 0646 FWL Field Location SECT 8 Sec ti on TOWN 1 ON Township RANG 15E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nat i on WITN G. GOODRICH Witness Name SON 500297 Service Order Number PDAT MSL Permanent da rum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 73. Above Permanent Datum EKB FT 73. Elevation of Kelly Bushing EDF FT 72. Elevation of Derrick Floor EGL FT 34. Elevation of Ground Level TDD FT 10345. Total Depth ~ Driller BLI FT 10320. Bottom Log Interval TLI FT 9403. Top Log Interval DFT FLO-PRO Drilling Fluid Type DFD G/C3 8.9 Drilling Fluid Density TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRA T SDSI BACK FBAC TCAN TCAF TCND TCFD TSCN TSCF INND INFD Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector Total counts analyzed - near detector (TDTP) Total counts analyzed - far detector (TDTP) Total capture counts - Near detector Total capture Counts - far dectector Total Selected Counts - Near Detector Total Selected Counts - Far Detector Inelastic count rate - near detector Inelastic count rate - far detector LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 16 DEFI LCO1 Local Computation 1 GRCH Gamma Ray in Casing ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 84 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500297 O0 000 O0 0 3 1 1 4 68 0000000000 SIGM PNAV CU 500297 O0 000 O0 0 3 1 1 4 68 0000000000 TPHI PNAV PU-S 500297 O0 000 O0 0 3 1 1 4 68 0000000000 SBHF PNAV CU 500297 O0 000 O0 0 3 1 1 4 68 0000000000 SBHNPNAV CU 500297 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC PNAV CU 500297 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH PNAV CU 500297 O0 000 O0 0 3 1 1 4 68 0000000000 TRAT PNAV 500297 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI PNAV CU 500297 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 TCANPNAV CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 TCAFPNAV CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 TCND PNAV CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD PNAV CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 TSCN PNAV CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 TSCF PNAV CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 17 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) INND PNAV CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 INFD PNAV CPS 500297 O0 000 O0 0 3 1 1 4 68 0000000000 LCO1 PNAV 500297 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 500297 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10320.000 SIGM. PNAV 14.464 TPHI.PNAV 28.505 SBHF. PNAV 29.550 SBHN. PNAV 43.344 SIGC. PNAV 1.156 SIBH. PNAV 80.713 TRAT. PNAV 2.010 SDSI.PNAV 0.150 BACK.~DTP 72.021 FBAC. TDTP 20.468 TCAN. PNAV 159937.188 TCAF. PNAV 63312.648 TCi~-D.PNAV 33285.211 TCFD.PNAV 10858.613 TSCN. PNAV 13086.215 TSCF. PNAV 5164.391 INND.PNAV 1949.592 INFD.PNAV 297.246 LCO1.PNAV 2.534 GRCH. TDTP -999.250 ** END OF DATA ** * * * * FILE TRAILER * * * * FILE NAME : EDIT .003 SERVICE · FLIC VERSION · O01CO1 DATE · 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SU~4~RY LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 18 TDTP LOG HEADER DATA VENDOR TOOL CODE START DEPTH 10322.0 DATE LOGGED: SOFTWARE VERSION: TI~E LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP TDTP DETECTOR CART. TDTP PROD. SONDE CARTRIDGE TDTP GA~IA RAY SOURCE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : STOP DEPTH 9400.0 21-JAN-96 CP 42.2 10345.0 9403.0 10320.0 900.0 NO TOOL NUMBER TDIC-A-797 CPSC-A-867 CGRS-A-862 10345.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : FLO- PRO 8.90 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 19 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REMA_~KS: RAW PASS #1 TIED INTO BHCS DATED 9/5/78 MADE 2 PASSES AT 900 FPH $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 1-17A Well Name APIN 500292028901 API Serial Number FL 0191 FNL & 0646 FWL Field Location SECT 8 Sec t i on TOWN 1 ON Town ship RANG 1SE Range COUN NORTH SLOPE County STAT ALASKA State or Province NA TI USA Nat i on WITN G. GOODRICH Witness Name SON 500297 Service Order Number PDAT MSL Permanent da turn EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 73. Above Permanent Datum EKB FT 73. Elevation of Kelly Bushing EDF FT 72. Elevation of Derrick Floor EGL FT 34. Elevation of Ground Level TDD FT 10345. Total Depth - Driller BLI FT 10320. Bottom Log Interval TLI FT 9403. Top Log Interval DFT FLO-PRO Drilling Fluid Type DFD G/C3 8.9 Drilling Fluid Density TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRAT SDSI Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 2O DEFI BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector LCO1 Local Computation 1 TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500297 O0 000 O0 0 4 1 1 4 68 0000000000 SIGM PS1 CU 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI PS1 PU 500297 O0 000 O0 0 4 1 1 4 68 0000000000 SBHF PS1 CU 500297 O0 000 O0 0 4 1 1 4 68 0000000000 SBHNPS1 CU 500297 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 21 NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) SIGC PS1 CU 500297 O0 000 O0 0 4 1 1 4 68 0000000000 SIBH PS1 CU 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT PS1 500297 O0 000 O0 0 4 1 1 4 68 0000000000 SDSI PS1 CU 500297 O0 000 O0 0 4 1 1 4 68 0000000000 BACK PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 FBAC PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TCANPS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TCAF PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TCND PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TCFD PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TSCN PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TSCF PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 INND PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 INFD PS1 CPS 500297 O0 000 O0 0 4 1 1 4 68 0000000000 LCO1 PS1 500297 O0 000 O0 0 4 1 1 4 68 0000000000 TENS PS1 LB 500297 O0 000 O0 0 4 1 1 4 68 0000000000 GR PS1 GAPI 500297 O0 000 O0 0 4 1 1 4 68 0000000000 CCL PS1 V 500297 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10328.000 SIGM. PS1 33,026 TPHI,PS1 SBHN. PS1 194.535 SIGC. PS1 0.000 SIBH,PS1 SDSI.PS1 0.643 BACK. PSI 23.404 FBAC. PS1 TCAF. PS1 0,000 TCND. PS1 -283.900 TCFD.PS1 TSCF.PS1 0,000 INND.PS1 -0.796 INFD. PS1 TENS.PSi -5005.000 GR.PS1 19.141 CCL.PS1 DEPT. 9398.500 SIGM. PS1 11.557 TPHI.PS1 SBHN. PS1 49.697 SIGC.PS1 1.274 SIBH. PS1 SDSI.PS1 0.094 BACK. PSl 225.969 FBAC.PS1 TCAF. PS1 106660.531 TCND. PS1 21107.000 TCFD.PS1 TSCF. PS1 2966.742 INND,PS1 1709.288 INFD.PS1 TENS.PSi -5025.000 GR.PSl 19.563 CCL.PS1 0 000 329 836 18 320 -209 544 - 0 623 0 008 SBHF. PS1 TRAT, PSl TCAN. PS1 TSCN, PS1 LCO1.PS1 15.735 SBHF, PS1 88.777 TRAT, PS1 43.778 TCAN. PS1 7110.296 TSCN, PS1 254.622 LCO1,PS1 0.000 98.162 0.000 0.000 0.000 0.000 37. 610 1. 572 211710. 875 5888. 697 1. 985 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 22 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE · 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: O . 5000 FILE SU~ff4ARY VENDOR TOOL CODE START DEPTH TDTP 10322.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) '. BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 9400.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP TDTP DETECTOR CART. TDTP PROD. SONDE CARTRIDGE TDTP GAMMA RAY SOURCE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : 21 -JAN-96 CP 42.2 10345.0 9403.0 10320.0 900.0 NO TOOL NUMBER ........... TDIC-A-797 CPSC-A-867 CGRS-A-862 10345.0 FLO-PRO 8.90 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 23 FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REMARKS: RAW PASS #2 TIED INTO BHCS DATED 9/5/78 MADE 2 PASSES AT 900 FPH $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VAL U DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 1-17A Well Name APIN 500292028901 API Serial Number FL 0191 FNL & 0646 FWL Field Location SECT 8 Sec ti on TOWN 1 ON Township RANG 15E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nat i on WITN G. GOODRICH Witness Name SON 500297 Service Order Number PDAT MSL Permanent da turn EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 73. Above Permanent Datum EK~ FT 73. Elevation of Kelly Bushing EDF FT 72. Elevation of Derrick Floor EGL FT 34. Elevation of Ground Level TDD FT 10345. Total Depth - Driller LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 24 TUNI VALU DEFI BLI FT 10320. Bottom Log Interval TLI FT 9403. Top Log Interval DFT FLO-PRO Drilling Fluid Type DFD G/C3 8.9 Drilling Fluid Density TABLE TYPE : CURV DEFI DEPT Dep th SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector LCO1 Local Computation 1 TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 25 TYPE REPR CODE VALUE 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500297 O0 000 O0 0 5 1 1 4 68 0000000000 SIGM PS2 CU 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TPHI PS2 PU 500297 O0 000 O0 0 5 1 1 4 68 0000000000 SBHF PS2 CU 500297 O0 000 O0 0 5 1 1 4 68 0000000000 SBHNPS2 CU 500297 O0 000 O0 0 5 1 1 4 68 0000000000 SIGC PS2 CU 500297 O0 000 O0 0 5 1 1 4 68 0000000000 SIBH PS2 CU 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT PS2 500297 O0 000 O0 0 5 1 1 4 68 0000000000 SDSI PS2 CU 500297 O0 000 O0 0 5 1 1 4 68 0000000000 BACK PS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 FBAC PS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TCANPS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TCAFPS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TCND PS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TCFD PS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TSCN PS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TSCF PS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 INND PS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 INFD PS2 CPS 500297 O0 000 O0 0 5 1 1 4 68 0000000000 LCO1 PS2 500297 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS2 LB 500297 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS2 GAPI 500297 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS2 V 500297 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10332.500 SIGM. PS2 11.557 TPHI.PS2 15.735 SBHF. PS2 SBHN. PS2 49.697 SIGC. PS2 1.274 SIBH. PS2 88.777 TRAT. PS2 SDSI.PS2 0.094 BACK. PS2 225.969 FBAC. PS2 43.778 TCAN. PS2 TCAF. PS2 106660.531 TCND.PS2 21107.000 TCFD.PS2 7110.296 TSCN. PS2 TSCF. PS2 2966.742 INND.PS2 1709.288 INFD.PS2 254.622 LCO1.PS2 TENS.PS2 -5025.000 GR.PS2 32.406 CCL.PS2 0.008 37.610 1.572 211710.875 5888.697 1.985 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-FEB-1997 12:10 PAGE: 2 6 DEPT. 9399.500 SIGM. PS2 11.856 TPHI.PS2 SBHN. PS2 49.912 SIGC. PS2 1.334 SIBH. PS2 SDSI.PS2 0.187 BACK. PS2 253.504 FBAC. PS2 TCAF.PS2 28225.520 TCND.PS2 20801.629 TCFD.PS2 TSCF.PS2 2881.212 INND.PS2 1709.892 INFD.PS2 TENS.PS2 -5025.000 GR.PS2 34.906 CCL.PS2 15.436 SBHF. PS2 88.868 TRAT. PS2 48.629 TCAN. PS2 6916.486 TSCN. PS2 254.049 LCO1.PS2 0.000 37.978 1.548 55294.367 5644.353 1.959 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION . O01CO1 DATE · 97/02/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/02/27 ORIGIN : FLIC TAPE NAME : 96042 CONTINUATION # : 1 PREVIOUS TAPE : COf~4ENT : ARCO ALASKA INC, DS 1-17A, PRUDHOE BAY, 50-029-20289-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE · 97/02/27 ORIGIN · FLIC REEL NAME · 96042 CONTINUATION # : PREVIOUS REEL : COf~4ENT : ARCO ALASKA INC, DS 1-17A, PRUDHOE BAY, 50-029-20289-01 _ape Subfile 2 is typ~: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: D.S. 1-17A 500292028901 ARCO ALASKA INC. SPERRY-SUN DRILLING SERVICES 04-JUN-96 MWD RUN 1 MWD RUN 2 MWD RUN 3 6691.00 B. JAHN B. JAHN B. JAHN GOODR I CH HUP P GOODR I CH MWD RUN 4 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: k FEL: . FWL: · ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: B. JAHN HUPP MWD RUN 5 WORTHINGTON GOODRICH MWD RUN 6 WORTHINGTON HUPP 8 10N 15E 191 646 73.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 9416.0 3.800 9420.0 3.750 10207.0 3.750 10345.0 MWD - GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. ALL RUNS, 1 - 6, WERE DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP/SGRD) UTILIZING SCINTILLATION TYPE DETECTORS. GAMMA RAY DATA ABOVE 9420' WAS ACQUIRED WHILE LOGGING THROUGH CASING THIS WELL, 1-17A, WAS KICKED OFF FROM 1-17 THROUGH A WINDOW CUT IN THE 9 5/8" CASING FROM 9416' - 9420'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 9352.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 9352.0 9353.5 9422.5 9424.0 9440.0 9441.0 9453.5 9454.5 9480.5 9482.0 9544.0 9544.0 9585.5 9588.0 9661.5 9664.0 9695.5 9696.0 9699.5 9700.5 9748.5 9748.5 9819.5 9820.0 9828.0 9827.5 9861.5 9862.0 9900.5 9899.5 9978.0 9976.5 10213.0 10215.5 10346.0 10345.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS: all bit runs merged. STOP DEPTH 10323.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 9375.0 9415.0 2 9415.0 9423.0 3 9423.0 9585.0 4 9585.0 9700.0 5 9700.0 10207.0 6 10207.0 10345.0 MERGED PASS. ROP WAS SHIFTED WITH GR. /? ?SHIFT. OUT $ CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 1-17A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 24 Tape File Start Depth = 10346.000000 Tape File End Depth = 9352.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5968 datums Tape Subfile: 2 134 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9353.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9391.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTP~ATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 1. 13-JAN-96 MSC 1.32 NGP 5.74 MEMORY 9415.0 9375.0 9415.0 0 32.0 · 35.3 TOOL NUMBER NGP 38 3.800 9420.0 SEAWATER/BIOZAN .00 .0 .0 0 .0 .000 .0 .000 137.5 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 1-17A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9420.000000 Tape File End Depth = 9352.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 3 Minimum record length: Maximum record length: 412 datums 65 records... 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9391.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9400.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 2. 14 -JAN- 96 MSC 1.32 NGP 5.74 MEMORY 9423.0 9415.0 9423.0 0 35.3 37.8 TOOL NUMBER NGP 38 3.8O0 9420.0 SEAWATER/BIOZAN .00 .0 .0 0 .0 .000 .0 .000 137.5 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT ARCO ALASKA INC. D.S. 1-17A PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 858 BYTES * Total Data Records: Tape File Start Depth = 9425.000000 Tape File End Depth = 9390.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6182 datums Tape Subfile: 4 Minimum record length: Maximum record length: 64 records... 62 bytes 858 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9404.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9562.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 3. 15-JAN-96 MSC 1.32 NGP 5.74 MEMORY 9585.0 9423.0 9585.0 0 38.4 76.3 TOOL NUMBER NGP 38 3.750 9420.0 FLO-PRO 8.90 .0 9.8 37000 5.9 .000 .000 .000 .000 .0 137.5 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 1-17A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 5 Tape File Start Depth = 9590.000000 Tape File End Depth = 9400.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1556 datums Tape Subfile: 5 68 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 R3~W MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9562.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9677.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 4. 16-JAN-96 MSC 1.32 NGP 5.74 MEMORY 9700.0 9585.0 9700.0 0 79.1 79.8 TOOL NUMBER NGP 38 3.750 9420.0 FLO - PRO 8.90 .0 9.6 38000 5.6 .000 .000 .000 .000 .0 137.5 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT ARCO ALASKA INC. D.S. 1-17A PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9700.000000 Tape File End Depth = 9560.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7026 datums Tape Subfile: 6 67 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9673.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10184.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 5. 18-JAN-96 MSC 1.32 NGP 5.74 MEMORY 10207.0 9700.0 10207.0 0 80.3 90.6 TOOL NUMBER NGP 38 3.750 9420.0 FLO-PRO 8.70 .0 8.9 44000 .0 .000 .000 .000 .000 .0 145.9 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT ARCO ALASKA INC. D.S. 1-17A PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 13 Tape File Start Depth = 10210.000000 Tape File End Depth = 9670.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4800 datums Tape Subfile: 7 76 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes _. Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10181.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10323.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGP) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 6. 19-JAN-96 MSC 1.32 NGP 5.74 MEMORY 10345.0 10207.0 10345.0 0 86.1 88.3 TOOL NUMBER NGP 38 3.750 9420.0 FLO-PRO 8.80 .0 9.5 40050 .0 .000 .000 .000 .000 .0 145.9 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT ARCO ALASKA INC. D.S. 1-17A PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10346.000000 Tape File End Depth = 10175.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8056 datums Tape Subfile: 8 68 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 9 is type: LIS 96/ 6/ 4 01 **** REEL TRAILER **** 96/ 6/ 5 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 5 JUN 96 3:54a Elapsed execution time = 1.15 seconds. SYSTEM RETURN CODE = 0 /:,!j,S 0 2 Oil & Gas Cons. rOo~r~nli~io~ /~ora§e * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : ARCO ALASKA INC. WELL NAME : D.S. 1 - 17A FIELD NAME : PRUDHOE BAY BOROUGH · NORTH SLOPE STATE · ALASKA API NUMBER : 500292028901 REFERENCE NO : 96149 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 96/07/26 ORIGIN · FLIC REEL NAME : 96 CONTINUATION # : PREVIOUS REEL : CO~_2~f : ARCO ALASKA INC, D.S. 1-17A, PRUDHOE BAY, 50-029-20289-01 **** TAPE HEADER **** SERVICE NA~iE : EDIT DATE : 96/07/26 ORIGIN ' FLIC TAPE NAME : 96 CONTINUATION # : 1 PREVIOUS TAPE : COf4FiENT : ARCO ALASKA INC, D.S. 1-17A, PRUDHOE BAY, 50-029-20289-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D. S. 1-17A API NUMBER: 500292028901 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 26-JUL-96 JOB NUFiBER: 96149 LOGGING ENGINEER: SIMMONS~BAIL OPERATOR WITNESS: MOXLOW/ERWIN SURFACE LOCATION SECTION: 8 TOWNSHIP: 1 ON RANGE: 15E FNL : 191 FSL: FEL: FWL: 646 ELEVATION (FT FROM MSL O) KELLY BUSHING: 73. O0 DERRICK FLOOR: 72. O0 GROUND LEVEL: 34. O0 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 13 . 375 2704.0 72. O0 2ND STRING 9. 625 9416. 0 47. O0 3RD STRING 2. 875 10345.0 6.40 PRODUCTION STRING 5. 500 8786.0 17. O0 CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: TDT LDWG CURVE CODE: GRCH RUN NUMBER: 1 PASS NUMBER: 1 DATE LOGGED: 21 -JAN- 96 LOGGING COMPANY: SCHLUMiBERGER WELL SERVICES .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH TDTP ..................... 88888.0 88886.5 10269.0 10267.5 10208.0 10210.0 10056.5 10058.5 10031.5 10033.5 9922.0 9924.0 9902.0 9903.5 9853.0 9855.0 9849.0 9851.5 9824.5 9825.0 9779.5 9782.0 9745.5 9746.0 9678.5 9680.0 9658.5 9660.5 9452.0 9453.5 9449.0 9451.0 9421.5 9420.5 100.0 99.0 $ This library tape contains a LDWG TDTP edit for ARCO Alaska well D.S. 1-17A. The file contains edited baseline passe #1, 2 edited borax passes, the average pass, 1 flowing pass and 1 pumping pass. The data was edited to fit on a diskette. The depth adjustments shown above reflect cased hole SIGM to SWS TDTP GR (21-JAN-96). All other TDTP curves were carried with the SIGM shifts. $ PAGE: **** FILE HEADER **** FILE NA~E : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUNMARY LDWG TOOL CODE START DEPTH STOP DEPTH TDTP 10310.0 9410.0 $ CURVE SHIFT DATA - PASS TO PASS (I~EASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NU~ER : BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH TDTP REMARKS: This file contains TDTP Pass #1 (Base Pass #1). pass to pass shifts were applied to this data. $ LIS FORMAT DATA No ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 2 3 4 5 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 92 66 1 66 0.5 FT 11 0 FT 68 1 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CI~SS MOD ~ SgMP EL~Vl CODE (HEX) DEPT FT 100384 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM TDTP CU 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 100384 O0 000 O0 0 1 1 1 4 68 0000000000 SBHF TDTP CU 100384 O0 000 O0 0 1 1 1 4 68 0000000000 SBPiNTDTP CU 100384 O0 000 O0 0 1 1 1 4 68 0000000000 SIGC TDTP CU 100384 O0 000 O0 0 1 1 1 4 68 0000000000 SIBH TDTP CU 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TRAT TDTP 100384 O0 000 O0 0 1 1 1 4 68 0000000000 LCO1 TDTP 100384 O0 000 O0 0 1 1 1 4 68 0000000000 SDSI TDTP CU 100384 O0 000 O0 0 1 1 1 4 68 0000000000 BACK TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TCAF TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TCND TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TCFD TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TSCN TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TSCF TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 INFD TDTP CPS 100384 O0 000 O0 0 1 1 1 4 68 0000000000 TENS TDTP LB 100384 O0 000 O0 0 1 1 1 4 68 0000000000 CCL TDTP V 100384 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH TDT GAPI 100384 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10320 SBHN. TDTP -999 LCO1.TDTP -999 TCAN. TDTP -999 TSCN. TDTP -999 TENS. TDTP -999 000 SIGM. TDTP -999.250 TPHI.TDTP -999.250 SBHF. TDTP 250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP 250 SDSI.TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP 250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP 250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP 250 CCL.TDTP -999.250 GRCH. TDT -999.250 DEPT. 9403.000 SBHN. TDTP -999.250 LCO1.TDTP -999.250 TCAN. TDTP -999.250 TSCN. TDTP -999.250 TENS. TDTP -999.250 SIGM. TDTP SIGC. TDTP SDSI.TDTP TCAF. TDTP TSCF. TDTP CCL.TDTP -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 TPHI. TDTP -999.250 SBHF. TDTP SIBH. TDTP -999. 250 TRAT. TDTP BACK. TDTP -999. 250 FBAC. TDTP TCND. TDTP -999.250 TCFD. TDTP INND. TDTP -999. 250 INFD. TDTP GRCH. TDT 17. 781 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 5 DEPTH INC~: 0.5000 FILE SU1PqARY LDWG TOOL CODE START DEPTH STOP DEPTH TDTP 10320.0 9420.0 $ CURVE SHIFT DATA - PASS TO PASS (t4~ASUREd~ DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: SIGM PASS NUI4~ER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH TDTP 88888.0 88886.0 10303.0 10301.0 10296.5 10294.5 10291.5 10289.0 10255.0 10252.0 10251.5 10248.0 10214.0 10211.5 10165.5 10166.5 10158.0 10158.0 10118.0 10119.0 9970.5 9972.0 9939.5 9940.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 9902.5 9852.5 9825.0 9739.5 9659.0 9580.5 9509 5 9499 0 9462 0 9441 5 9429 0 100 0 $ 9903.0 9855.0 9825.0 9739.0 9660.0 9582.0 9510.0 9499.0 9462.5 9442.0 9427.0 98.0 REMARKS: This file contains Borax Pass #2 of the TDTP. The depth adjustments shown above reflect Borax Pass #2 SIGM to Base Pass #1 SIGM. All other TDTP curves were carried with the SIGMA shifts. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: ** SET TYPE ~ CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUb~ SAMP ELEM CODE (HEX) DEPT FT 100384 O0 000 O0 0 2 1 1 4 68 0000000000 SIGMTDTP CU 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 100384 O0 000 O0 0 2 1 1 4 68 0000000000 SBHF TDTP CU 100384 O0 000 O0 0 2 1 1 4 68 0000000000 SBI{NTDTP CU 100384 O0 000 O0 0 2 1 1 4 68 0000000000 SIGC TDTP CU 100384 O0 000 O0 0 2 1 1 4 68 0000000000 SIBHTDTP CU 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TRATTDTP 100384 O0 000 O0 0 2 1 1 4 68 0000000000 LCO1 TDTP 100384 O0 000 O0 0 2 1 1 4 68 0000000000 SDSI TDTP CU 100384 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TCAFTDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TSCNTDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TSCFTDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 INND TDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 100384 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 100384 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 100384 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10318.000 SIGM. TDTP 32.150 TPHI.TDTP 35.637 SBHF. TDTP SBHN. TDTP 70.383 SIGC. TDTP 0.000 SIBH. TDTP 221.156 TRAT. TDTP LCO1.TDTP 2.684 SDSI.TDTP 0.798 BACK. TDTP 227.090 FBAC. TDTP TCAN. TDTP 10090.000 TCAF. TDTP 3491.500 TCND.TDTP 9552.750 TCFD. TDTP TSCN. TDTP 1142.352 TSCF. TDTP 425.594 INND.TDTP 1968.438 INFD. TDTP TENS. TDTP -50.000 CCL.TDTP 0.000 60.047 1.485 71.094 2614.875 327.875 DEPT. 9418.000 SIGM. TDTP 12.468 TPHI.TDTP 21.566 SBHF. TDTP 30.381 SBHN. TDTP 43.607 SIGC. TDTP 1.017 SIBH. TDTP 75.753 TRAT. TDTP 1.808 LCO1.TDTP 2.238 SDSI.TDTP 0.177 BACK. TDTP 267.160 FBAC. TDTP 50.417 TCAN. TDTP 55227.000 TCAF. TDTP 24672.750 TCND. TDTP 28910.500 TCFD.TDTP 10501.750 TSCN. TDTP 11675.625 TSCF. TDTP 5216.063 INND. TDTP 2046.750 INFD. TDTP 357.875 TENS. TDTP -55.000 CCL.TDTP 0.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAM~ : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE1TUblBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 6 DEPTH INCREMENT: 0.5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH TDTP 10320.0 9392.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: SIGM PASS NUM~ER: 1 BASELINE DEPTH 88888 0 10292 0 10259 5 10256 0 10252 5 10248 5 10212 5 10170 0 10158 0 10041.0 9962.0 9939.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... TDTP 88885.5 10289. 10256. 10252 10248 10243 10210 10170 10158 10041 9962 9940 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 9904.0 9903 9853.5 9855 9826.0 9825 9740.0 9739 9660.0 9660 9510.0 9510 9499.0 9499 9462.0 9462 9442.0 9441 9422.0 9420 100.0 98 REMARKS: This file contains Borax Pass #3 of the TDTP. The depth adjustments shown above reflect Borax Pass #3 SIGM to Base Pass #1 SIGM. All other TDTP curves were carried with the SIGM shifts. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100384 O0 000 O0 0 3 1 1 4 68 0000000000 SIGM TDTP CU 100384 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 10 NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CI_~SS MOD NUMB SgMP EL~I CODE (HEX) TPHI TDTP PU-S 100384 O0 000 O0 0 3 1 1 4 68 0000000000 SBHF TDTP CU 100384 O0 000 O0 0 3 1 1 4 68 0000000000 SBHN TDTP CU 100384 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC TDTP CU 100384 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH TDTP CU 100384 O0 000 O0 0 3 1 1 4 68 0000000000 TRAT TDTP 100384 O0 000 O0 0 3 1 1 4 68 0000000000 LCO1 TDTP 100384 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI TDTP CU 100384 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 TCAN TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 TCND TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 TSCNTDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 TSCF TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 INND TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 INFD TDTP CPS 100384 O0 000 O0 0 3 1 1 4 68 0000000000 TENS TDTP LB 100384 O0 000 O0 0 3 1 1 4 68 0000000000 CCL TDTP V 100384 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10317.500 SIGM. TDTP 37.583 TPHI.TDTP 37.922 SBHF. TDTP SBP~N. TDTP 72.963 SIGC. TDTP 0.000 SIBH. TDTP 233.902 TRAT. TDTP LCO1.TDTP 2.517 SDSI.TDTP 0.870 BACK. TDTP 292.383 FBAC. TDTP TCAN. TDTP 10476.662 TCAF. TDTP 3733.399 TCND.TDTP 8745.816 TCFD. TDTP TSCN. TDTP 1025.752 TSCF. TDTP 407.456 INND.TDTP 1942.730 INFD. TDTP TENS.TDTP -55.000 CCL.TDTP 0.000 DEPT. 9398.000 SIGM. TDTP 11.526 TPHI.TDTP 13.852 SBHF. TDTP SBt{N. TDTP 53.120 SIGC. TDTP 1.258 SIBH. TDTP 96.725 TRAT. TDTP LCO1.TDTP 1.862 SDSI.TDTP 0.260 BACK. TDTP 292.546 FBAC. TDTP TCAN. TDTP 29953.230 TCAF. TDTP 16085.113 TCND. TDTP 20915.348 TCFD.TDTP TSCN. TDTP 6201.271 TSCF. TDTP 3330.130 INND. TDTP 1993.070 INFD. TDTP TENS. TDTP -55.000 CCL.TDTP 0.000 59.698 1.388 78.459 2513.045 322.571 38.663 1.480 58.815 7524.576 303.148 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE ~ FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFiE : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NTJFfl~ER: 4 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREM~JFT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS .......................... 1, 2, 3, TDTP The arithmetic average of passes 1, 2 & 3 was computed after all depth shifts and clipping was applied. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 12 TYPE REPR CODE VALUE 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUbl~ SAMP ELEM CODE (HEX) DEPT FT 100384 O0 000 O0 0 4 1 1 4 68 0000000000 SIGM PNAV CU 100384 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI PNAV PU-S 100384 O0 000 O0 0 4 1 1 4 68 0000000000 SBHF PNAV CU 100384 O0 000 O0 0 4 1 1 4 68 0000000000 SBPZNPNAV CU 100384 O0 000 O0 0 4 1 1 4 68 0000000000 SIGC PNAV CU 100384 O0 000 O0 0 4 1 1 4 68 0000000000 SIBH PNAV CU 100384 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT PNAV 100384 O0 000 O0 0 4 1 1 4 68 0000000000 SDSI PNAV CU 100384 O0 000 O0 0 4 1 1 4 68 0000000000 BACK TDTP CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 FBAC TDTP CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 TCANPNAV CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 TCAFPNAV CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 TCND PNAV CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 TCFD PNAV CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 TSCN PNAV CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 TSCF PNAV CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 INND PNAV CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 INFD PNAV CPS 100384 O0 000 O0 0 4 1 1 4 68 0000000000 LCO1 PNAV 100384 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10308.500 SIGM. PNAV 13.617 TPHI.PNAV 29.433 SBHF. PNAV 27.999 SBPZN. PNAV 43.299 SIGC. PNAV 1.093 SIBH. PNAV 81.923 TRAT. PNAV 2.081 SDSI.PNAV 0.170 BACK. TDTP 256.215 FBAC. TDTP 64.996 TCAN. PNAV 73293.188 TCAF. PNAV 27973.363 TCND.PNAV 35148.180 TCFD.PNAV 11403.875 TSCN. PNAV 14602.914 TSCF. PNAV 5573.669 INND.PNAV 2053.876 INFD. PNAV 351.490 LCO1.PNAV 2.620 DEPT. 9409.000 SIGM. PNAV 12.133 TPHI.PNAV 15.657 SBHF. PNAV 33.354 SBHN. PNAV 44.379 SIGC. PNAV 2.432 SIBH. PNAV 71.439 TRAT. PNAV 1.549 SDSI.PNAV 0.319 BACK. TDTP 292.666 FBAC. TDTP 52.136 TCAN. PNAV 26865.629 TCAF. PNAV 13308.287 TCND.PNAV 21967.816 TCFD.PNAV 6903.811 TSCN. PNAV 5476.201 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 13 TSCF. PNAV 2712.576 INND.PNAV 1924.453 INFD.PNAV 286.967 LCO1.PNAV 2.017 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUA~BER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 5 DEPTH INCREMENT: 0.5000 FILE SO?4MARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10330.5 9414.0 TDTP LOG H~ER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VE2CDOR TOOL CODE TOOL TYPE 8-MAY-96 CP 44.2 1541 8-MAY-96 10345.0 0.0 8700.0 10333.0 1800.0 NO TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 14 TDTP TDTP TDTP TDTP TDTP TDTP TDTP THERMAL DECAY PROD. LOGGING TOOL TDTP CARTRIDGE TDTP SONDE DETECTOR TDTP SONDE GENERATOR TDTP DETECTOR CART. PROD LOGGING SONDE AH95 CPLE-A 787 TNC P 141 TND P 75 TNG P 236 TDIC 816 CPLS-A 808 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 2704.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) '. SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEAWATER/BORAX/CRUDE 33.0 191.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 This file contains the raw data from borax pass #2. TIED INTO SWS TDT DATED 21-JAN-96 THE PURPOSE OF THIS LOG WAS TO FIND THE SOURCE OF HIGH GORAND IDENTIFY GAS BEARING ZONES. PROCEDURE: LOGGED DOWN WITH THE WELL FLOWING. LOGGING DOWN INDUCED A SHIFT INTO SIGMAND TPHI. BOTH FLOWING AND INJECTING DOWN PASS ARE PRESENTED BUT NOT INCLUDED ON OVERLAYS. INJECTING PASSES USED THE MAXIMUMRATE POSSIBLE KEEPING DOWNHOLE PRESSURE BELOW 5000 PSI. WELLBORE BORAX DOES NOT SHOW UP IN 2 7/8" LINER UNLESS THERE IS ADDITIONAL LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 15 SIGNAL FROM FORMATION. PUMPING TIMES, RATES AND VOLUMES ARE AVAILABLE ON THE ARCO WELL WORK LOG IF NEEDED. APPARENT GOC IS AT 10065' AND THERE IS AN UP CHANNEL FROM THE UPPER PERF INTERVAL TO GAS ZONES. CHECKS AT THE LINER TOP DID NOT INDICATE THAT ANY BORAX WAS PRESENT BEHIND CASING. THE FLOWING VS INJECTING PASSES INDICATE LOWER TPHI IN THE PERFS AND SO~iEWHAT LOWER UP INTO THE GAS CAP ZONES. THE TIME LAPSE OVERLAY FROM JANUARY LOG TO MAY LOG SHOW LOWER POROSITY IN THE GAS CAP AND HIGHER POROSITY IN THE PERFORATED INTERVAL. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 104 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100384 O0 000 O0 0 5 1 1 4 68 0000000000 SIGM FL1 CU 100384 O0 000 O0 0 5 1 1 4 68 0000000000 TPHI FL1 PU 100384 O0 000 O0 0 5 1 1 4 68 0000000000 SBHF FLI CU 100384 O0 000 O0 0 5 1 1 4 68 0000000000 SBP~NFL1 CU 100384 O0 000 O0 0 5 1 1 4 68 0000000000 SIGC FL1 CU 100384 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 16 NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) SIBH FL1 CU 100384 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT FL1 100384 O0 000 O0 0 5 1 1 4 68 0000000000 SDSI FL1 CU 100384 O0 000 O0 0 5 1 1 4 68 0000000000 BACK FL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 FBAC FL1 CPS 100384 O0 000 O0 0 5 i 1 4 68 0000000000 TCANFL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 TCAFFL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 TCND FL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 TCFD FL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 TSCN FL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 TSCF FL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 INNDFL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 INFD FL1 CPS 100384 O0 000 O0 0 5 1 1 4 68 0000000000 TENS FL1 LB 100384 O0 000 O0 0 5 1 1 4 68 0000000000 CCL FL1 V 100384 O0 000 O0 0 5 1 1 4 68 0000000000 PTEMFL1 DEGF 100384 O0 000 O0 0 5 1 1 4 68 0000000000 PPRE FL1 PSI 100384 O0 000 O0 0 5 1 1 4 68 0000000000 DEVI FL1 DEG 100384 O0 000 O0 0 5 1 1 4 68 0000000000 PRH FL1 G/C3 100384 O0 000 O0 0 5 1 1 4 68 0000000000 CVEL FL1 F/HR 100384 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 9478.000 SIGM. FL1 22.544 TPHI.FL1 0.000 SBHF. FL1 SBHN. FL1 178.680 SIGC.FL1 0.000 SIBH.FL1 300.772 TRAT. FL1 SDSI.FL1 6.248 BACK.FL1 22.357 FBAC.FL1 8.458 TCAN. FL1 TCAF.FLi 0.000 TCND.FL1 -278.209 TCFD.FL1 -98.477 TSCN. FL1 TSCF. FL1 0.000 INND.FL1 -0.760 INFD.FL1 -0.288 TENS.FL1 CCL.FL1 0.026 PTEM. FL1 194.948 PPRE. FL1 3403.589 DEVI.FL1 PRH. FL1 19.369 CVEL.FL1 2015.625 DEPT. 10321.500 SIGM. FL1 SBP~N. FL1 34.691 SIGC.?L1 SDSI.FL1 0.232 BACK. FL1 TCAF. FL1 32774.328 TCND.FL1 TSCF. FL1 6799.652 INND.FL1 CCL.FL1 0.000 PTE~.FL1 PRH. FL1 153.634 CVEL.FL1 13. 812 1 950 358 522 39765 406 2770 660 196 428 1861 875 TPHI.FL1 29.340 SBHF. FL1 SIBH. FL1 43.794 TRAT. FL1 FBAC. FL1 472.815 TCAN. FL1 TCFD. FL1 13313.209 TSCN. FL1 INFD.FLi 456.180 TENS. FL1 PPRE. FL1 3448.338 DEVI.FL1 132.581 0.000 0.000 0.000 -55.000 58.000 23.986 2.069 84886.563 17611.316 -55.000 86.188 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 17 **** FILE TRAILER **** FILE NA~E : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : .006 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 8 DEPTH INCREMENT: 0.5000 FILE SU?4MARY VENDOR TOOL CODE START DEPTH STOP DEPTH 8680.5 10320.0 TDTP LOG HEADER DATA DATE LOGGED: 8-MAY-96 SOFTWARE VERSION: CP 44.2 TIME LOGGER ON BOTTOM: 1541 8-MAY-96 TD DRILLER (FT) : 10345.0 TD LOGGER (FT) : O. 0 TOP LOG INTERVAL (FT) : 8700.0 BOTTOM LOG INTERVAL (FT) : 10333.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER TDTP THERMAL DECAY AH95 TDTP PROD. LOGGING TOOL CPLE-A 787 TDTP TDTP CARTRIDGE TNC P 141 TDTP TDTP SONDE DETECTOR TND P 75 TDTP TDTP SONDE GENERATOR TNG P 236 TDTP TDTP DETECTOR CART. TDIC 816 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 PAGE: 18 TDTP PROD LOGGING SONDE CPLS-A 808 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) .. DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 2704.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) .. SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEAWATER/BORAX/CRUDE 33.0 191.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 ~ COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 This file contains the raw data from pumping pass #1. logged down at 30 FPM. TIED INTO SWS TDT DATED 21-JAN-96 THE PURPOSE OF THIS LOG WAS TO FIND THE SOURCE OF HIGH GOR AND IDENTIFY GAS BEARING ZONES. PROCEDURE: LOGGED DOWN WITH THE WELL FLOWING. LOGGING DOWN INDUCED A SHIFT INTO SIGM AND TPHI. BOTH FLOWING AND INJECTING DOWN PASS ARE PRESENTED BUT NOT INCLUDED ON OVERLAYS. INJECTING PASSES USED THE MAXIMUM RATE POSSIBLE KEEPING DOWNHOLE PRESSURE BELOW 5000 PSI. WELLBORE BORAX DOES NOT SHOW UP IN 2 7/8" LINER UNLESS THERE IS ADDITIONAL SIGNAL FROM FORMATION. PUMPING TIMES, RATES AND VOLU~ES ARE AVAILABLE ON THE ARCO WELL WORK LOG IF NEEDED. APPARENT GOC IS AT 10065' AND THERE IS AN UP CHANNEL FROM THE UPPER PERF INTERVAL TO GAS ZONES. LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 CHECKS AT THE LINER TOP DID NOT INDICATE THAT ANY BORAX WAS PRESENT BEHIND CASING. THE FLOWING VS INJECTING PASSES INDICATE LOWER TPHI IN THE PERFS AND SOMEWHAT LOWER UP INTO THE GAS CAP ZONES. THE TI~iELAPSE OVERLAY FROM JANUARY LOG TO MAY LOG SHOW LOWER POROSITY INTHE GAS CAP ANDHIGHER POROSITY IN THE PERFORATED INTERVAL. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 108 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 100384 O0 000 O0 0 6 1 1 4 68 0000000000 SIGM PP1 CU 100384 O0 000 O0 0 6 1 1 4 68 0000000000 TPHI PP1 PU 100384 O0 000 O0 0 6 1 1 4 68 0000000000 SBHF PP1 CU 100384 O0 000 O0 0 6 1 1 4 68 0000000000 SBHNPP1 CU 100384 O0 000 O0 0 6 1 1 4 68 0000000000 SIGC PP1 CU 100384 O0 000 O0 0 6 1 1 4 68 0000000000 SIBH PP1 CU 100384 O0 000 O0 0 6 1 1 4 68 0000000000 TRAT PP1 100384 O0 000 O0 0 6 1 1 4 68 0000000000 LCO1 PP1 100384 O0 000 O0 0 6 1 1 4 68 0000000000 SDSI PP1 CU 100384 O0 000 O0 0 6 1 1 4 68 0000000000 BACK PP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 FBAC PP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 NABiE SERV UNIT SERVICE API API API API FILE NUb~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TCANPP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 TCAFPP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 TCND PP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 TCFD PP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 TSCN PP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 TSCF PP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 INND PP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 INFD PP1 CPS 100384 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PP1 LB 100384 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PP1 V 100384 O0 000 O0 0 6 1 1 4 68 0000000000 PTEMPP1 DEGF 100384 O0 000 O0 0 6 1 1 4 68 0000000000 PPRE PP1 PSI 100384 O0 000 O0 0 6 1 1 4 68 0000000000 DEVI PP1 DEG 100384 O0 000 O0 0 6 1 1 4 68 0000000000 PRH PP1 G/C3 100384 O0 000 O0 0 6 1 1 4 68 0000000000 CVEL PP1 F/HR 100384 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 8680.500 SIGM. PP1 52.279 TPHI.PP1 77.474 SBHF. PP1 SBP~N. PP1 77.834 SIGC. PP1 0.000 SIBH. PP1 257.972 TRAT. PP1 LCO1.PP1 0.000 SDSI.PP1 0.973 BACK. PPi 95.025 FBAC. PP1 TCAN. PP1 15668.744 TCAF. PP1 3561.610 TCND.PP1 14318.240 TCFD.PP1 TSCN. PP1 817.453 TSCF. PP1 173.781 INND. PP1 2444.321 INFD.PP1 TENS.PPI -45.000 CCL.PP1 0.026 PTEM. PP1 138.144 PPRE. PP1 DEVI.PP1 26.906 PRH. PP1 11.562 CVEL.PP1 2008.125 DEPT. 10320.000 SIGM. PP1 16.344 TPHI.PP1 37.125 SBHF. PP1 SBHN. PP1 40.819 SIGC. PP1 0.480 SIBH. PP1 75.076 TRAT. PP1 LCO1.PP1 0.000 SDSI.PP1 0.218 BACK. PPi 420.144 FBAC. PP1 TCAN. PP1 90959.797 TCAF. PP1 31782.465 TCND. PP1 33882.953 TCFD. PP1 TSCN. PPi 14102.230 TSCF. PP1 4927.491 INND.PP1 2081.820 INFD.PP1 TENS.PPi -40.000 CCL.PP1 0.000 PTE~.PP1 142.354 PPRE. PP1 DEVI.PP1 86.500 PRH. PP1 181.054 CVEL.PP1 1702.500 79. 016 1. 782 142. 575 3015. 690 382. 677 4917.106 34.452 2.231 470.906 10293.994 336.438 4920.751 ** END OF DATA ** **** FILE TRAILER **** FILE NAPiE : .006 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 26-JUL-1996 09:56 **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 96/07/26 ORIGIN · FLIC TAPE NAM~ : 96 CONTINUATION # : 1 PREVIOUS TAPE : COf~_iVT : ARCO ALASKA INC, D.S. 1-17A, PRUDHOE BAY, 50-029-20289-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 96/07/26 ORIGIN · FLIC REEL NA~E · 96 CONTINUATION # : PREVIOUS REEL : COMPiE2VT : ARCO ALASKA INC, D.S. 1-17A, PRUDHOE BAY, 50-029-20289-01