Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-021David Douglas Hilcorp Alaska, LLC Sr. GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: Date: 10/09/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL Well: MPU J-01AL1 PTD: 201-021 API: 50-029-22070-60-00 Definitive Directional Survey (Composited) - Definitive Directional Survey 05/16/2024 Main Folder Contents: Please include current contact information if different from above. 201-021 T39649 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.10.10 08:09:47 -08'00' Imag~ 'roject Well History' File Cover :il ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ _~ L- ~c:~I Well History File Identifier RE, CAN DIGITAL DATA OVERSIZED (Scannable) '~'/ Color items: [/~ Diskettes, No.o~ D Maps: [] Grayscale items: [] Other, No/Type [] Other items scannable by large scanner [] Poor Quality Originals: OVERSIZED (Non-Scannable) [] Other: [] Logs of various kinds NOTES: [] Other Project Proofing BY: BEVERLY ROBIN VINCENT SHERY~"~ WINDY ScanningPreparation i x 30 = _L~.~ + ~i~' = TOTAL PAGES ~"~? · BY: BEVERLY ROBIN VINCENT SHERY~INDYj. DATE ~I/S/ Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: ~ ~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: /~ YES Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) NO NO RESCANNEDB?': BEVERLY ROBIN VINCENT SHERYL MARIA WINDY General Notes or Comments about this file: DATE: /SI Quality Checked 12/10/02Rev3NOTScanned.wpd e e "..~. i····: . -':;f,':·, ¡.... " ,- , "-i1-~:.". MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfihn _ Marker. doc ' STATE OF ALASKA ~" ALASK~ ..,IL AND GAS CONSERVATION CO{,~,,MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Type of Request: [] Abandon [] Suspend [] Operation Shutdown [] Perforate [] Vadance I~10the~ [] Alter Casing [] Repair Well [] Plug Perforations [] Stimulate [] Time Extension Change Out ESP [] Change Approved Program [] Pull Tubing [] Perforate New Pool [] Re-Enter Suspended Well [] Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. [] Development [] Exploratory 201-021 I;3. Address: [] Stratigraphic [] Service 6. APl Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22070-60-00 7. KB Elevation (ft): KBE = 65.65' 9. Well Name and Number: MPJ-01AL1 8. Property Designation: 10. Field / Pool(s): ADL 315848 Milne Point Unit/Schrader Bluff 11. Present well condition summary Total depth: measured 7950 feet true vertical 4165 feet Plugs (measured) N/A Effective depth: measured 7950 feet Junk (measured) N/A true vertical 4165 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 70' 13-3/8" 105' 105' 2730 1130 Surface 2374' 9-5/8" 2409' 2364' 3520 2020 Intermediate Production 3605' 7" 3640' 3502' Liner 1325' 4-1/2" 3512' - 4837' 3383' - 4035' Liner 3143' 2-3/8" 4567'- 7710' 4011'- 4161' Perforation Depth MD (ft): Slotted Liner: 4624'- 7677' Perforation Depth TVD (ft): Slotted Liner: 4022'- 4161' Tubing Size (size, grade, and measured depth): 2-7/8", 6.5# L-80 3476' Packers and SSSV (type and measured depth): N/A N/A 12. Stimulation or cement squeeze summary: ,@ Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Representative Daily Avera~le Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 489 543 158 Subsequent to operation: 382 98 292 14. Attachments: 15. Well Class after proposed work: [] Copies of Logs and Surveys run [] Exploratory [] Development [] Service [] Daily Report of Well Operations 16. Well Status after proposed work: [] Oil [] Gas [] WAG [] GINJ [] WINJ [] WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I Sundry Number or N/A if C.O. Exempt: I Contact Robert Odenthal, 564-4387 ,, ,,,, Printed Name Sondra Stewman Title Technical Assistant .,~'~"~ / ~~m~.____ -- Prepared By Name/Number: ...... a.e So.d,a Form 10-404 Revised 2/2003 BP EXPLORATION Page I of 1 Operations Summary Report Legal Well Name: MPJ-01 {' ~f~'~-OI/~L. I Common Well Name: MPJ-01A' Spud Date: 12/1/1999 Event Name: WORKOVER Start: 8/19/2003 End: 8/20/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 8/20/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From -To Hours Task Code NPT Phase Description of Operations 811912003 .00:00 - 02:30 2.50 MOB P PRE Move from F-58 to J-01A. 02:30 - 03:30 1.00 RIGU P PRE Spot Sub, Pipe Shed, Pits, and Camp. 03:30 - 04:30 1.00 RIGU P PRE Raise and Scope Dreeick. 04:30 - 06:00 1.50 RIGU :P PRE Take 140 deg F. 2% KCL Water in Rig Pits. Lay lines to Tiger Tank and Production Tree. Crew change. 06:00- 06:30 0.50 WHSUR P DECOMP PJSM. Pick-up Lubricator. Pull BPV. Lay down same. Pressure test lines to 3500 psi. Good. 06:30 - 09:00 2.50 KILL P DECOMP Open Well. Tbg pressure 70 psi. Annulus presure 790 psi. Bleed gas from Annulus. Attempted to circulate well, however unable to get returns. Bullhead Kill well with 2% KCL Water at 4 -5 bpm/100 psi. Monitor Well. Well on vacuum. 09:00 - 09:30 0.50 WHSUR P DECOMP Set TWC and test. 09:30 - 10:00 0.50 WHSUR P DECOMP Nipple down Production Tree. 10:00 - 12:00 2.00 BOPSUF; ~ DECOMP N/U BOPE. CIO pipe rams, install 2 7/8" x 5" pipe rams. Function test pipe rams. 12:00 - 13:00 1.00 BOPSUF ~ DECOMP Body test on BOPE, 250 / 3500 psi, OK. 13:00 - 14:00 1.00 WHSUR ~ DECOMP Pick up lubricator, pull two way check valve. .14:00 - 14:30 0.50 PULL ~ DECOMP BOLDs. Pull hanger to floor, 42K up wt. L/D hanger. 14:30 - 17:30 3.00 PULL P DECOMP POOH w/2 7~8" ESP completion string, double displacing hole, well stable. Spool up old cable. Recovered 7 protectrolizers, 3 flat guards & 61 LaSalle clamps. 17:30 - 20:00 2.50 PULL P DECOMP Break out & L/D ESP. Bolts were frozen & much scale on pump. R/D tiger tank. 20:00 - 21:00 1.00~ PULL P DECOMP Clear & clean rig floor. PJD elephant trunk. Change out old cable spool. 21:00 - 23:00 2.00 RUNCO~ F' COMP M/U & service new ESP. 23:00 - 00:00 1.00 RUNCO~ F~ COMP :~IH w/new ESP & new cable. Ran 15 stands 2 7~8" tbg. 812012003 00:00 - 02:00 2.00 RUNCO~ P COMP Con't to RIH w/2 7/8" ESP completion. Space out & M/U hanger. Ran 106 its 2 7~8" Tbg. 02:00 - 04:00 2.00 RUNCOItl~ .COMP Splice ESP cable to hanger penetrator. Check & test same. 04:00 - 04:30 0.50 BOPSUB P 'COMP Set two way check valve. 04:30 - 06:00 1.50 BOPSUB P COMP Nipple down BOPE. 06:00 - 07:00 1.00 WHSUR P COMP ~Nipple up tree. Test void & tree to 5000 psi, OK. 07:00 - 08:00 1.00 WHSUR P COMP Pick up lubricator. Pull two way check, set BPV. Secure well. Rig released @ 08:00 hfs, 812012003. Printed: 8/2512003 9:06:29 AM Permit to Drill 20t0210 MD 7950 ~-~ 'I'VD DATA SUBMITTAL COMPLIANCE REPORT 61312003 Well Name/No. MILNE PT UNIT SB J-01AL1 Operator BP EXPLORATION (ALASKA) INC 4165 ..- Completion Dat 5/25/2001 ~ Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-22070-60-00 UIC N REQUIRED INFORMATION Mud Log N._Qo Sample N~o Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt Log Log Run Name Scale Media No Interval Start Stop 4666 7950 (data taken from Logs Portion of Master Well Data Maint) OH I CH Open Dataset Received Number Comments 7/26/2001 10219 ? 4666-7950 ~ MD/RES 2/5 FINAL (:G'R/MD/Wellbore 2/5 FINAL ~ GP,/RES 2 FINAL LIS Verification FINAL 10244 FINAL Directional Survey FINAL MWD Survey FINAL 4666 7950 Open 4853 7950 OH 4850 7950 OH 4850 7950 OH 4666 7950 CH 4666 7950 OH OH OH 7/13/2001 ~10244 4666-7950 7/9/2001 7/9/2001 7/9/2001 7/9/2001 7/9/2001 7/6/2001 7/6/2001 4853-7950 BL, Sepia 4850-7950 BL, Sepia 4850-7950 BL, Sepia 4666-7950 Paper Copy 4666-7950, Digital Data Directional Survey, Paper Copy MWD Survey, Digital Data Well Cores/Samples Information: Name Interval Start Stop Sent Dataset Received Number Comments ADDITIONAL INFORMATION Well Cored? Y Chips Received? Analysis R ~.r~.iv~.d ? Daily History Received? ~ N Formation Tops ~ N Comments: Permitto Drill 2010210 MD 7950 'I'VD DATA SUBMITTAL COMPLIANCE REPORT 613/2003 Well Name/No. MILNE PT UNIT SB J-01AL1 Operator BP EXPLORATION (ALASKA) INC 4165 Completion Dat 5/25/2001 Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-22070-60-00 UIC N Compliance Reviewed By: Date: ALASKA OIL AND GAS CONSERVATION COM ~oSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 201-021 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22070-60 4. Location of well at surface i ....... ~'- C~!,; ' '9. Unit or Lease Name 2622'At topSNL'of productive3378' WEL,intervaiSec. 28, T13N, R10E, UM ] ~'-:.~oD.~ t~ I Milne Point Unit 1126' SNL, 3688' WEL, Sec. 28, T13N, R10E, UM ,~ -; ,~-TT-i .' '~ -'') At total depth ~=;... ~ ...... ~ 10. Well Number 1835' NSL, 3249' WEL, Sec. 21, T13N, R10E, UM ~=.~ ,~- ..... .,...~. MPJ-01AL1 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Milne Point Unit / Schrader Bluff KBE = 65.65' ADL 3158~ 17. lotal Dopth (MD+IVD) 118. ~lu0 Back Dopth (MD+TVD) I10. Diroctional 8umog 1 20. Dopth whoro 888Vsot121. lhicknoss of ~ormaffost 7950 4165 FTI 7050 4165 "*1 a Yes D NoI N/A MDI 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES 23. CASING~ LINER AND CEMENTING RECORD CASING SE~ING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO~OM S~ZE CEMENTING RECORD AMOUNT PULLED 13-3/8" 54.5~ K-55 35' 105' 30" 500 SX Permafrost 'C' 9-5/8" 3~ K-55 35' 2409' 12-1/4" 1145 sx Permafrost 'E' 7" 26~ L-80 35' 3640' 8-1/2" ~93 sx Class 'G' 4-1/2" 12.6~ L-80 3512' 4837' 6-1/8" 97 sx Class 'G' 2-3/8" 4.~ L-80 4567' 7710' 3-3/4" Uncemented SIoEed Liner 24. Pedorations open to Production (MD+TVD of Top and 25. TUBING RECORD BeReT and inte~al, size and number) S~ZE DEPTH SET (MD) PACKER SET (UD) 2-3/8" SIo~ed Liner Section 2-7/8", 6.5~, L-80 3~0' None MD TVD MD TVD 4624' - 4816' 4022' - 4035' 4849' - 5167' 4035' - 4106' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. 5199' - 5521' 4109' - 4126' DEPTH INTERVAL (MD) AMOUNT & K~ND OF MATERIAL USED 5553' - 5869' 4126' - 4133' 4835' Set Whipstock 5901' - 6222' 4134' - 4141' 6255' - 6576' 4141' - 4140' Freeze Protect w/80 Bbls of Dead Crude 6608' - 6928' 4140' - 4151' 6979' - 7677' 4152' - 4161' ,, 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) May 27, 2001 Electric Submersible Pump Date of Test Hours Tested PRODUCTION FOR OIL'BBL GAS'MCF WATER'BBL CHOKE SIZE ~ GAS'OIL RATIO TEST PERIOD I Flow Tubing Oasing Pressure CALCULATED O~L-BaL GAS-MCF WATER-BBL O~L GRAV~'API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosi~, fractures, apparent dips and presence of oil, gas or water. Subm,RE~E tVE D JUL J 0 001 Alaska Oil & Gas Cons. Commission Anchorage Form 10-407 Rev. 07-01-80 ORiGiNAL Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Top of Schrader OA 4692' 4030' Base of Schrader OA 4992' 4067' Top of Schrader OB 5155' 4105' RECEIVED JUL i 0 Alaska Oil & Gas Cons. Commission Anchorage 31. List of Attachments: Summary of Daily Drilling Reports, Surveys ,. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble ~~ ~~~._. Title TechnicalAssistant Date MPJ-01 AL1 201-021 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ORIGINAL BP EXPLORATION Page1 of 2 Operations Summa Report Legal Well Name: MPJ-01 Common Well Name: MPJ-01A L1 Spud Date: 12/1/1999 Event Name: WORKOVER Start: 5/3/2001 End: 5/8/2001 Contractor Name: NABORS Rig Release: 5/8/2001 Rig Name: NABORS 4ES Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 5/3/2001 14:00 - 00:00 10.00 MOB P PRE MI/RU 5/4/2001 00:00 - 02:00 2.00 MOB P PRE MI/RU 02:00 - 07:00 5.00 KILL P DECOMP RIG LINES & TEST & KILL WELL WITH 8.5 PPG. & MONITOR & SET TWC. 07:00 - 08:30 1.50 WHSUR P DECOMP NIPPLE DOWN TREE. 08:30 - 11:30 3.00 BOPSUF~ P DECOMP NIPPLE UP BOP 11:30-14:00 2.50 BOPSUF;P DECOMP TEST BOP TO 250 LOW & 2500 HIGH. 14:00 - 15:30 1.50 PULL P DECOMP PULL TWC. 15:30 - 16:30 1.00 PULL P DECOMP PULL HANGER TO FLOOR. 16:30 - 00:00 7.50 PULL P DECOMP POOH LAYING DOWN 2-7/8" TBG. & HEAT TRACE & BAKER SENSOR & ESP EQUIPMENT. 5/5/2001 00:00 - 03:30 3.50 PULL P DECOMP CONT. POOH LAYING DN 2-7~8" TBG. & HEAT TRACE & BAKER SENSOR & ESP 03:30 - 06:00 2.50 BOPSUI; P DECOMP CHANGE RAMS TO 2-3/8" & TEST TO 250 & 2500 HIGH. 06:00 - 23:00 17.00 CLEAN P DECOMP MU/BAKER MILL ASSY #1 3.75" MILL+MTR+JARS+2-3/8" DP +3.5" DP & RIH TO 7080' PACKOFF BSHG. & CONDITION MUD & DISPLACE TO WELL BORE 9.2 PPB. BARADRIL-N WITH 31 PPB. CALCIUM CARBONATE. 23:00 - 00:00 1.00 CLEAN P DECOMP MILL ON PACK OFF BSHG. IN 4.5" LINER. & LOOSING 80 BBL. PER. HR. AT START & WELL WAS HEALING.LOSS 5/6/2001 00:00 - 04:30 4.50 CLEAN P DECOMP MILL ON PACKOFF BSHG. @ 7080' MADE NO FORWARD PROGRESS LOSSES WERE DOWN TO 27 BBL. PER. HR. 0~.:30- 07:00 2.50 CASE P DECOMP POOH TO 4950' 07:00 - 08:00 1.00 CASE P DECOMP MU HES RTTS PKR & SET @ 28' BELOW RT. 08:00- 10:30 2.50 CASE P DECOMP NIPPLE DOWN BOP'S 10:30- 14:30 4.00 CASE P DECOMP NIPPLE UP 11"X4.5"TBG. SPOOL ON TOP OF EXISTING SPOOL & BOP & TEST TO 2500 PSI. 14:30 - 15:00 0.50 CASE P DECOMP RELEASE RTTS PKR & PULL & LAY DN 15:00 - 16:00 1.00 CASE P DECOMP CUT DRLG. LINE 16:00 - 19:00 3.00 CASE P DECOMP POOH & CHECK 3.75" MILL & MTR. ALL OK. 19:00- 19:30 0.50 CASE P DECOMP CLEAN RIG FLOOR. 19:30-00:00 4.50 CASE P DECOMP RIHWITH MILL ASSYTO 7083' 5/7/2001 00:00 - 01:00 1.00 CASE P DECOMP PICK UP KELLY 01:00 - 03:30 2.50 CASE P DECOMP MILL PACKOOFF BHSG @ 7083' & GUIDE SHOE @7127' 03:30 - 08:00 4.50 CASE P DECOMP WASH FILL 7127' TO 7270' FLUID LOSS 15-BBL. PER HR. AND INCREASING TO 60 BBL. PER HR. AFTER WASHING THROUGH BRIDGE RIGH OUT OF SHOE USED ROTARY IT IS HARD TO TELL JUST HOW MUCH FILL DUE TO FACT THAT SLIDING PIPE IN HOLE WAS DIFFICULT WITHOUT ROTATION WITH KELLY ALTHOUGH THE LAST JOINT SLIDE VERY EASY WITHOUT THE ASSIST OF THE KELLY THE HOLE WAS NOT AS A PACKED HOLE. SAMPLES AT SURFACE WERE DIFFICULT AS SCHRADER IS VERY SMALL SAND LOSSES DEPLETED THE FLUID SYSTEM AND HAD TO SHUD DOWN AND WAIT. 08:00 - 09:30 1.50 CASE P DECOMP PULL BHA INTO SHOE & EVALUATE. 09:30 - 11:30 2.00 CASE P DECOMP MIX & PUMP PILL 81 # PER. BBL. CALCIUM CARBONATE. 11:30 - 14:30 3.00 CASE P DECOMP POOH' LAYING DOWN DP TO 4950' 14:30 - 16:00 1.50 CASE P DECOMP DISPLACE WELL BORE WITH CLN-FILTERED SEAWATER. 16:00 - 20:00 4.00 CASE P DECOMP POOH STANDING 2-3/8" BACK IN DERRICK. 20:00 - 00:00 4.00 CASE P DECOMP RUN 4.5" WORK STRING TO 3347' 5/8/2001 00:00 - 00:30 0.50 CASE P DECOMP MU & LAND HANGER & RILDS Printed: 5/24/2001 2:46:32 PM BP EXPLORATION Page 2 of 2 Operations Summary Report i Legal Well Name: MPJ-01 Common Well Name: MPJ-01A L1 Spud Date: 12/1/1999 Event Name: WORKOVER Start: 5/3/2001 End: 5/8/2001 IContractor Name: NABORS Rig Release: 5/8/2001 Rig Name: NABORS 4ES Rig Number: Date From-To Hours =Activity Code NPT Phase Description of Operations 5/8/2001 00:30- 03:30 3.00 CASE P DECOMP RIH WITH 3.75" O.D. X 16' DRIFT TO 4950' (SEEN NO RESTRICTIONS) 03:30 - 08:00 4.50 CASE P DECOMP LAY DOWN 2-3/8" DRILL PIPE & DRIFT. L/D BHA & CLEAR RIG FLOOR. 08:00 - 08:30 0.50 WHSUR P DECOMP INSTALL & TEST TWC TO 3000 PSI, OK. 08:30 - 10:30 2.00 BOPSUF.P DECOMP N/D BOPE. 10:30 - 14:00 3.50 WHSUR P DECOMP N/U X-MAS TREE. 14:00 - 14:30 0.50 WHSUR P DECOMP PRESSURE TEST HANGER VOID & TREE TO 5000 PSI, OK. 14:30 - 16:00 1.50 WHSUR P DECOMP R/U LUBRICATOR & PULL TWC. INSTALL BPV. SECURE WELL & CLEAN CELLAR. RELEASE RIG @ 1600 HRS, 5-8-01. 16:00 - 00:00 8.00 DEMOB P DECOMP PJD & MOVE TO MPK-02. Printed: 5/24/2001 2:46:32 PM BP EXPLORATION Page 1 of 4 Operations Summa Report Legal Well Name: MPJ-01 Common Well Name: MPJ-01A L1 Spud Date: 12/1/1999 Event Name: REENTER+COMPLETE Start: 5/10/2001 End: 5/18/2001 Contractor Name: NABORS Rig Release: 5/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 5/10/2001 20:00 - 00:00 4.00 RIGU P PRE Accept rig 20:00 hrs 5/10/2001. ND extra tree valve. NU BOPE. 5/11/2001 00:00 - 02:00 2.00 RIGU P PRE Finish NU BOPE. 02:00 - 05:00 3.00 RIGU P PRE MIRU DS ~4. 05:00 - 06:30 1.50 RIGU P PRE Pull BPV. Set TWC. 06:30 - 07:00 0.50 RIGU P PRE Safety meeting. 07:00 - 08:00 1.00 STWHIP P ,WEXIT RU methanol and triplex and test joints. 08:00 - 15:30 7.50 STWHIP P WEXlT Pressure test BOPE. Witness waived by AOGCC's Chuck Sheve 15:30 - 16:30 1.00 STWHIP P WEXIT Re-head OXP. 16:30 - 17:15 0.75 STWHIP P WEXlT Pull TWC. 17:15 - 18:45 1.50 STWHIP P WEXlT Fill hole -- 35 bbls. Pretty big suck. Monitor static losses during crew changeout. 18:45 - 19:45 1.00 STWHIP P WEXlT PU inj. Install nozzle. Stab onto well and PT packoff. 19:45 - 21:00 1.25 STWHIP P WEXlT Open well and circulate methanol out of coil. Monitor 'losses. Loss rate .3 BPM. POH 21:00 - 23:00 2.00 STWHIP P WEXlT MU BHA#1 23:00 - 23:59 0.98 STWHIP P WEXlT RIH 5/12/2001 00:00 - 01:00 1.00 STWHIP P WFXlT RIH 01:00 - 03:30 2.50 STWHIP P WEXlT Log tie-in at GR character around 4161'. Correct depth (+3'). 03:30 - 03:45 0.25 STWHIP P WEXlT Orient for whipstock face at 180 deg. 03:45 - 04:00 0.25 STWHIP P WEXIT Set whipstock release setting tool with 2466 psi differential. Set down 6K. 04:00 - 05:00 1.00 STWHIP P WEXlT POH 05:00 - 05:45 0.75 STWHIP P WEXlT MU BHA #2 (2.5 deg motor; tapered DSM). 05:45 - 06:30 0.75 STWHIP P WEXlT RIH 06:30 - 07:00 0.50 STVVHIP P WEXlT Tie-in at 4161'. Correct depth (-5'). 07:00-07:15 0.25 STWHIP P WEXlT RIHwith 165L TF and tag dry at 4837'. PU. RIH with pumps and stall 4836'. PU to 4835' and start time milling here. 07:15 - 12:00 4.75 STWHIP P WEXIT Time mill per program at 165L TF. Intial 2.5/1.7 at 2900 psi. Losses slowed to 2.4~2.3. Mill 2' of window to 4838'. Pump 15 bbls 3 ppb biozan pill. 12:00 - 13:15 1.25 STWHIP P WEXIT Open circsub. POOH. 13:15 - 14:15 1.00 STWHIP P WEXIT ,Change-out motor with straight motor and RIH with BHA #3 (tapered DSM and string mill). 14:15 - 15:15 1.00 STWHIP P WEXlT RIH. 15:15 - 15:30 0.25 STWHIP P WEXIT Log tie-in. No correction. 15:30 - 15:45 0.25 S'I'WHIP P WEXIT RIH and tag 4837.5' with pumps 15:45 - 18:00 2.25 S'I'WHIP P WEXIT Mill 2.5/2.4 BPM and 2900 psi to 4843' whe~re it looks like it skipped-out into formation. Mill to 4845'. ',,J 18:00 - 18:30 0.50 S'I'WHIP P WEXIT Ream and backream window. Pump 20 bbl high vis pill. 18:30 - 20:00 1.50 S'I'WHIP P WEXIT Mill formation to 4853'. Window OK. 20:00 - 21:00 1.00 STWHIP P WEXIT Window 4837' - 4843'. POOH. 21:00 - 22:30 1.50 DRILL P PROD1 MU BHA 4 22:30 - 00:00 1.50 DRILL P PROD1 RIH BHA//~4 5/13/2001 00:00 - 01:30 1.50 DRILL P PROD1 RIH circulating at 2.3 bpm loss rate 1.5 bpm. Continue to RIH circulating across top of well and tie in. 01:30 - 02:00 0.50 DRILL N DPRB PROD1 Wait on mud. Vac truck not available to deliver mud. MIX 35 bbl pill 81#/bbl CaCO3 pill. 76 bbl loss between 21:00 and 02:00. 02:00 - 03:00 1.00 DRILL N DPRB PROD1 Broke circulation to warm coil no returns. Stopped circulating across well allow it to seek its level. Monitor fluid top with down hole annular pressure. Annular pressure 1912 psi when Printed: 5/24/2001 2:46:44 PM BP EXPLORATION Page 2 of 4 Operations Summa Report Legal Well Name: MPJ-01 Common Well Name: MPJ-01A L1 Spud Date: 12/1/1999 Event Name: REENTER+COMPLETE Start: 5/10/2001 End: 5/18/2001 Contractor Name: NABORS Rig Release: 5/18/2001 Rig Name: NABORS 3S Rig Number: Date From -To Hours ;Activity Code NPT Phase Description of Operations 5/13/2001 02:00 - 03:00 1.00 DRILL N DPRB PROD1 stopped circulating across top of well at 02:00. Annular pressure @ 02:36 = 1900psi.@ 03:00 +1860 psi. 03:00 - 05:30 2.50 DRILL N DPRB PROD1 Truck in route to MI. Continuing to mix 35 bbl CaCO3 pill 83#/bbl. Current fluid on location 76bbl 9.9 ppg mud. 310 bbl 9.9 brine,258 bbl 8.9 biozan milling fluid.Annular pressure 1750. (Still falling). Circulate 3 bbl to warm coil. Annular pressure 1813 psi. 05:30 - 06:30 1.00 DRILL N DPRB PROD1 Off-load mud into pits. 06:30 - 07:00 0.50 DRILL N DPRB PROD1 Safety meeting. 07:00 - 09:00 2.00 DRILL N DPRB PROD1 Pump 30 bbl CaCO3 pill. Lay-in. Monitor losses. No change. Maybe worse. No returns at 2.5 BPM. 09:00 - 09:30 0.50 DRILL P PROD1 RIH and check if window is OK (haven't been thru it yet). 09:30 - 10:00 0.50 DRILL P PROD1 Tag TD 4853'. Window clean. Drill to 4866' at 2.2 BPM, no returns, P-annulus = 2180 psi. (Note: when window was milled with near fullreturns, P-annulus was 2000 psi.) 10:00 - 14:45 4.75' DRILL N DPRB PROD1 Running out of mud again. PUH and discuss options. Order 8.7 ppg Fie-Pro. Fill hole with milling fluid (8.5 ppg 2% KCL with biozan). Wait on mud. BHAP (bottom-hol annulus pressure) = 1800 psi with hole full of 8.5 fluid. 14:45 - 15:45 1.00 DRILL P PROD1 Load pits with new mud (8.9 ppg vs 8.7 ppg requested). Drill. 2.4~2.0 and 1980 BHAP initial with annulus full of 8.5 brine. As mud climbed-up the backside, losses increased to 2.2/1.0 and BHAP increased to 2050 psi. Gradually, returns improved to 2.2/1.6. BHAP = 2110 psi. Drill to 4960'. 15:45 - 16:00 0.25 DRILL P PROD1 Wiper to window. 16:00 - 17:15 1.25 DRILL P PROD1 Drill 2.2/1.6 to 5115'. 17:15 - 17:40 0.42 DRILL P PROD1 Wiper to window. 17:40 - 19:40 2.00 DRILL P PROD1 Drill 2.1/1.3 then gradually improved back to 2.1/1.6. BHAP = 2160 psi. 19:40 - 20:00 0.33 DRILL P PROD1 Drilling @ 5282' at 117 ft/hr 2.4 bpm loss rate with 8.9 ppg is :.6 bpm. pressuer 2698 psi down hole in side coil and 2182 psi annular pressure 10.4 ECD. Drill to 5300'. 20:00 - 21:00 1.00 DRILL P PROD1 Trip to shoe. 21:00 - 22:00 1.00 DRILL P PROD1 Drill 5300 - 5400 at 2.2 bpm losses= .4 bpm. Pressuer 2671 psi down hole in side coil and 2184 psi annular pressure 10.4 ECD. 22:00 - 23:00 1.00 DRILL P PROD1 POH 23:00 - 00:00 1.00 DRILL P PROD1 LD BH^~4 and PU BHA#5 5/14/2001 00:00 - 00:15 0.25 DRILL P PROD1 MU BHA #5. No losses noted while circulating across top of well. 00:15 - 01:15 1.00 DRILL P PROD1 RIH. 01:15 - 03:15 2.00 DRILL N PROD1 Per program, log from 4695 to 4875. RIH to 5400. 03:15 - 06:00 2.75 DRILL P PROD1 Start drilling at 5400' at 2.1/1.4. Pressure at BHA 2646 psi, pressure in annulus 2168 psi, pump pressure 2758 psi ECD 10.3 ppg. Drill to 5550'. 06:00 - 06:45 0.75 DRILL P PROD1 Wiper to window 06:45 - 09:00 2.25 DRILL P PROD1 Drill 2.1/1.8 with BHAP = 2200 psi to 5746'. 09:00 - 09:45 0.75 DRILL P PROD1 Wiper to window. 09:45 - 11:20 1.58 DRILL P PROD1 Drill 2.2/1.7 with BHAP = 2230 psi to 5900'. 11:20- 12:15 0.92 DRILL P PROD1 Wiper to window. 12:15 - 13:15 1.00 DRILL P PROD1 Drill 2.2/1.8 with BH^P = 2240 psi to 6050'. 13:15- 14:15 1.00 DRILL P PROD1 Wiper to window. 14:15 - 15:30 1.25 DRILL P PROD1 Drill 2.4/2.1 with BH^P = 2260 psi to 6215'. Hit another hard Printed: 5/24/2001 2:46:44 PM BP EXPLORATION Page 3 of 4 Operations Summary Report Legal Well Name: MPJ-01 Common Well Name: MPJ-01A L1 Spud Date: 12/1/1999 Event Name: REENTER+COMPLETE Start: 5/10/2001 End: 5/18/2001 Contractor Name: NABORS Rig Release: 5/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 5/14/2001 14:15 - 15:30 1.25 DRILL P PROD1 spot. Stack, a tad bit of overpull. 15:30 - 16:30 1.00 DRILL P PROD1 Wiper to window. 16:30 - 18:15 1.75 DRILL P PROD1 Drill 2.4/2.1 with BHAP = 2270 psi to 6400'. ReP's near 200 FPH. Still positive CT weight. 18:15- 19:15 1.00 DRILL P PROD1 Wiper to window. 19:15 - 21:45 2.50 DRILL P ' PROD1 Drill 2.4/2.2 with BHAP -- 2282 psi calcite stringers 30 fph at 6460, 6470, & 6475.drill to 6600. 21:45 - 22:20 0.58 DRILL P PROD1 Wiper to window. 22:20 - 23:45 1.42 DRILL P PROD1 Drill 2.4/2.1 with BHAP 2290. Drill to 6814' 23:45 - 00:00 0.25 DRILL P PROD1 Wiper to window. 5/15/2001 00:00 - 00:45 0.75 DRILL P PROD1 Wiper to window. 00:45 - 05:00 4.25 DRILL P PROD1 Directionallly drill 2.4/2.3 hitting several stringers of calcite (I guess the correct name for this stuff is siderite). 05:00 - 06:30 1.50 DRILL P PROD1 ~Wiper to window. '06:30 - 08:15 1.75 DRILL P PROD1 :Drill 2.4/2.2 to 7180'. i08:15 - 10:00 1.75 DRILL P PROD1 !Wiper to window. Check RA. No correction. 10:00 - 12:00 2.00 DRILL P PROD1 Drill 2.5/2.3 to 7335'. Seeing more vibration -- indicative of bit wearing-out? 12:00 - 13:30 1.50 DRILL P PROD1 Wiper to window. Open circ sub and wash up thru 4-1/2" and 7 "liners to 3300' at 3.0 BPM 13:30 - 14:15 0.75 DRILL P PROD1 Since we're this far, POOH to check bit. 14:15 - 15:15 1.00 DRILL P PROD1 OOH. Bit rerunnable (1-4) with a couple of chipped cutters on the outside shoulder. CIO mechanical release sub. 15:15 - 16:45 1.50 DRILL P PROD1 RIH. On-depth at PA. RIH to TD, tagging at 7343'. 16:45 - 17:45 1.00 DRILL P PROD1 Drill 2.5/2.2 with BHAP = 2340 psi. Drill solids at 1.3%. Drill to 7470'. 17:45 - 19:20 1.58 DRILL P PROD1 :Wiper to window. 19:20 - 21:05 1.75 DRILL P PROD1 Drill 2.4/2.3 with BHAP = 2340 psi. Drill solids at 1.3%. Drill to 7597' having problems with weight transfer and drilling calcite ' stringers. 21:05 - 23:30 2.42 DRILL P PROD1 Wiper trip to window. Swapping out Fie-Pro mud. 23:30 - 00:00 0.50 DRILL P PROD1 Drill ahead f/7597'. New mud around 2.5/2.4 with BHAP = 2270 psi. Drill to 7620'. 5/16/2001 00:00 - 01:50 1.83 DRILL P PROD1 Continue drilling ahead f/7620' to 7775'. 2.5/2.4 with BI-I^P = 2270 psi. 01:50 - 04:45 2.92 DRILL P PROD1 Wiper trip to window. Having some difficulty getting back to bottom starting at 6900' (negative weight from here to TD). 04:45 - 06:30 1.75 DRILL C PROD1 Drill to 7950' 2.5/2.3 with 2325 psi BHAP. Holding back on ReP to 200fph. Could drill 300+ fph. Mixing 30bbl pill with 2#/bbl Bio. 06:30 - 09:30 3.00 DRILL C PROD1 Pump pill, wiper to window 2.7 BPM. Tie-in at PA. Correct depth (+5'). RIH. From 7300' to TD, averaging negative 10k to 15k at max running speed 10 - 20 FPM Motor work at 7677', otherwise clean. Tag TD 7952'. 09:30 - 10:15 0.75 DRILL P PROD1 Transfer new mud to pit #2, add additional lubetex. 10:15 - 12:30 2.25 DRILL P PROD1 POOH. Displacing well to new Fie-Pro mud. 12:30-14:00 1.50 DRILL P PROD1 OOH. Monitor well. LD drilling BHA. Clear floor. 14:00 - 17:30 3.50 CASE P LNR1 Unstab E-line coil. Restab ROC coil. RU to run liner. 17:30 - 18:00 0.50 CASE P LNR1 Safety meeting. 18:00 - 18:30 0.50 CASE P LNR1 MU shoe jt and FDR vibrator tool. 18:30 - 19:00 0.50 CASE P LNR1 Test vibrator tool with bag closed. Works with water, but not Fie-Pro. Also, pressures appear high -- 900 psi at 1.0 BPM. 19:00 - 19:30 0.50 CASE P LNR1 LD vibrator. Printed: 5/24/2001 2:46:44 PM BP EXPLORATION Page 4 of 4 Operations Summa Report Legal Well Name: MPJ-01 Common Well Name: MPJ-01A L1 Spud Date: 12/1/1999 Event Name: REENTER+COMPLETE Start: 5/10/2001 End: 5/18/2001 Contractor Name: NABORS Rig Release: 5/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 5/16/2001 19:30 - 00:00 4.50 CASE P LNR1 Make-up and standback TIW & safety joint. M/U 2 3/8" shoe joint and start running liner. Run 5 jts and stop for Well Control Drill using safety jt. Resume running 2 3/8" slotted liner. 5/17/2001 00:00 - 00:30 0.50 CASE P LNR1 Finish p/u 2 3/8" slotted liner. 00:30 - 00:45 0.25 CASE P LNR1 PJSM on p/u of 1" CSH tubing. 00:45 - 04:30 3.75 CASE P LNR1 P/U 1" CSH tubing. Stab-in and space out same. M/U deployment tools. 04:30 - 06:00 1.50 CASE P LNR1 P/U CT injector. M/U CTC and pull test to 30k. 06:00 - 06:30 0.50 CASE P LNR1 Safety meeting. 06:30 - 07:30 1.00 CASE P LNR1 PT hardline. Fill coil with mud. 07:30 - 08:00 0.50 CASE P LNR1 Finish MU MHA. 08:00 - 08:30 0.50 CASE P LNR1 MU liner to CT. Strip over. Liner slipped downhole about 15' where XO stopped at 2-3/8" pipe/slips (system P at 1500 psi). 108:30 - 11:00 2.50 CASE P LNR1 RIH with liner 70 FPM to 7270'. Stack-out. Alternate circulate then work pipe gradually to 7540'. Slight losses 1.3/1.1. !11:00 - 11:30 0.50 CASE N DPRB LNR1 Increase in flow noted. SD pump. Still flowing. SI superchoke. Monitor pressure. WHP = 0. Open well. No ' flow. 11:30 - 12:30 1.00 CASE N DPRB LNR1 Circulate 1.2; 2700 psi and work pipe. Seeing crude in returns. CBU. No loss in mud density. Flow check -- no flow. 12:30 - 15:15 2.75 CASE P LNR1 Work liner down. Repeat cycles: Circulate about 20 bbls, PU to full string wt, and RIH. Getting pipe down in about 5' - 10' increments before circulation is required again. Work pipe to 7698'. Not making much progress past here. Need to make +12' correction for our "zero" after pipe slippage at surface. Guide shoe at 7710'. 115:15 - 16:00 0.75 CASE P 'LNR1 Try increasing circulation rate between push attempts. Circ 20 bbls at 1.6 BPM; 3550 psi. PU. PUH. Sheared CTLRT (PU 25k vs 40k with liner). Unsting from O-ring sub. 16:00 - 16:30 0.50 CASE P LNR1 Safety meeting: Hole displacement and spotting bleach. 16:30 - 18:50 2.33 CASE P LNR1 Spot trucks. Pump 50 bbls 8.7 ppg brine (w/3% KCL) ahead followed by laying in 1:1 35 bbls bleach. Displace annulus with KCL. (recovered 255 bbls Fie-Pro mud to be returned to MI for next well) 18:50 - 22:45 3.92 CASE P LNR1 Wait on bleach. Monitor well. Fill hole each hr 2.3 bbl, 2.8 bbl, 3.2 bbl. 22:45 - 00:00 1.25 CASE P LNR1 Circulate out bleach to opentop tank and start TOH. 5/18/2001 00:00 - 01:30 1.50 CASE P LNR1 Tag-up 3171' with LRT. 01:30 - 02:00 0.50 CASE P LNR1 PJSM to setback injector 02:00 - 03:15 1.25 CASE P LNR1 Setback injector. 03:15 - 08:00 4.75 CASE P LNR1 L/D Baker LTR tools and 1" CSH tubing in singles. Clear floor 08:00 - 08:30 0.50 RIGD P COMP Start RD. 08:30 - 09:00 0.50 RIGD P COMP Set BPV. 09:00 - 11:30 2.50 RIGD P COMP RD equipment. Unstab ROC, stab E-line coil. 11:30 - 14:00 2.50 RIGD P COMP ND BOPE. NU and PT master valves. Release rig 14:00 hrs 5-18-01. Printed: 5/24/2001 2:46:44 PM BP EXPLORATION Page 1 of 1 Operations Summary Report Legal Well Name: MPJ-01 Common Well Name: MPJ-01A L1 Spud Date: 12/1/1999 Event Name: COMPLETION Start: 5/23/2001 End: Contractor Name: NABORS Rig Release: 5/25/2001 Rig Name: NABORS 4ES Rig Number: 4ES Date From - To Hours Activity Code NPT Phase Description of Operations 5/23/2001 08:00 - 18:00 10.00 RIGU PRE MMI/RU & SAFE OUT EQUIPMENT. AND ACCEPT RIG @ 1800 HRS. 5/23/2001 18:00 - 23:30 5.50 KILL DECOMP RIG UP & MONITOR WELL 270 PSI. TBG. & 270 PSI. ANNULUS & CIRC INFLUX TO TIGER TANK. WITH 8.5 PPG. FLUID. & MONITOR SAME. 23:30 - 00:00 0.50 WHSUR DECOMP SET TWC & MONITOR SAME. 5/24/2001 00:00 - 01:00 1.00 WHSUR DECOMP NIPPLE DOWN TREE. 01:00 - 02:30 1.50 BOPSUF DECOMP NIPPLE UP BOP 02:30 - 03:30 1.00 BOPSUF DECOMP BODY TEST BOP TO 2500 PSI, (TEST WAIVED BY JEFF JONES WITH AOGC) 03:30 - 06:30 3.00 DHEQP DECOMP PULL HANGER TO FLOOR & LAY DN WITH 1-JT. 4,5" WORK STRING & INSTALL HES RTTS PKR & SET @ 30' & TEST TO 2500 PSI. 06:30 - 07:30 1.00 BOPSUF DECOMP NIPPLE DOWN BOP 07:30 - 08:00 0.50 WHSUR DECOMP NIPPLE DOWN TOP TBG. 11" X 4.5" TBG. SPOOL. 08:00 - 09:00 1.00 BOPSUF DECOMP NIPPLE UP BOP 09:00 - 09:30 0.50 BOPSUF DECOMP BODY TEST BOP TO 2500 PSI. 09:30 - 12:30 3.00 PULL DECOMP PULL & LAY DN RTTS PKR & PULL & LAY DN 4.5" WORK STRING. 12:30 - 23:00 10.50 RUNCOI~ COMP RIG UP TO RUN & RUN 2-7/8" ESP COMPLETION & INSTALL ESP CONNECTOR TO HANGER & LAND SAME. 23:00 - 00:00 1.00 BOPSUF COMP NIPPLE DOWN BOP ~5/25/2001 00:00 - 01:00 1.00 WHSUR COMP NIPPLE DOWN TREE 01:00 - 03:00 2.00 WHSUR COMP TEST TREE TO 5000 PSI. & SET BP¥ & SECURE AREA. AND RELEASE RIG @ 05-25-2001 @ 0300 HRS. Printed: 5/29/2001 1:34:02 PM MILNE POINT, ALASKA TO: FROM: WELL# Main Category: Subject: Date: Troy Weiss Matthew Linder J-01a Pumpin~l Freeze protect 5/25/01 I Objective: Freeze protect well after RWO Operation: Freeze protected tubing with 15 bbls of dead crude at 1 bpm/1000 psi. Freeze protect annulus with 65 bbls of dead crude at 1.5 bpm/850 psi. Conclusion: Wellbore is freeze protected. SIWHP:300 IA:200 OA:0 Note: All measurements are slickline depths unless otherwise noted. Diesel Used [ J Methanol Used J J Diesel/Methanol cost tracking: BP Amoco Baker Hughes INTEQ Survey Report Comptuy: BP Amoco Date: 6/19/2001 Time: 10:35:48 Page: 1 Field: Maine Point Ce-erdinate(NE) Refereuce: Well: MPJ-01, True North Site: M Pt J Pad VerticM (TYD) Reference, 4: 01 11111/1999 15:00 65.7 WeB: MPJ-01 Section (va) Referemce: Well (0.00N,0.00E,10.0OAzt) Wenpath: MPJ-OIAL1 Survey C. mi~wlati~m Method: Minimum Curvature Db: Oracle Field: Maine Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: BGGM2001 Site: M Pt J Pad TR-13-10 UNITED STATES: North Slope Site Position: Northing: 6013415.23 ff Latitude: 70 26 50.647 N From: Map Lasting: 551435.10 ff Longitude: 149 34 49.503 W Position Uncertainty: 0.00 ff North Reference: True Ground Level: 0.00 ff Grid Convergence: 0.40 deg Well: MPJ-01 Slot Name: 01 MPJ-01 Well Position: +N/-S 1636.04 ff Northing: 6015054,63 ff Latitude: 70 27 6.737 N +E/-W 515.39 ff Eastlng: 551939.14 ff Longitude: 149 34 34.366W Position Uncertainty: 0.00 ff Wellpath: MPJ-01AL1 Drilled From: MPJ-01A 500292207060 Tie-on Depth: 4837.00 ff Current Datum: 4: 01 11/11/1999 15:00 Height 65.65 ff Above System Datum: Mean Sea Level Magnetic Data: 5/2/2001 Declination: 26.27 deg Field Strength: 57441 nT Mag Dip Angle: 80.78 deg Vertical Section: Depth From (TYD) +NI-S +E/-W Direction ff ff ff deg 0,00 0.00 0.00 10.00 Survey: MWD Start Date: 5/16/2001 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Annotation ' , : : ' ,MDi':::, ~'~'' mD :, ' ' , ': ..... "i, i,' ', ='' , ,,:, : ,: ~, : 'ift'~i :'i ',!:~i!: :::' ' ,,: ,'i' ' ' ' , ' ' ' , ', , , , ,, , ' ' , ' , ,, , , , , , , 4837.00 4035.19 KOP 7950.00 4164.99 Projected to TD Survey ' MD'~ :,!' "::Incl ~":Azlm: : ::::TVD: SSTVD,: N/S ,,E/W,::, M. uPN D~,S ' VSi,' , ,:~ ':: :' ,,'~' !dog:':','i': ,dOg ', "i,~: ~ :, , i~ ,''~ '~":' ,"::~t:": ' n::' ::i ~!ii,, deg/100~ ft' ,, 4837.00 89.88 337.28 4035.19 3969, 54 1625.79 -376.45 6016677.60 551551.40 0.00 1535.72 4865.00 64.20 337.10 4036.63 3970,98 1651.56 -387.29 6016703.29 551 540.39 20.30 1559.21 4900.00 78,60 338.00 4041.87 3976,22 1683,53 -400.50 6016735.16 551526.96 16,20 1588,40 4930.00 76.00 342,30 4048.46 3982.81 1711,04 -410.44 6016762,60 551516.83 16.45 1613.78 4962,00 72.60 347.30 4057.13 3991.48 1740.75 -418.52 6016792.25 551508.54 18,41 1 641.63 4994.00 69,00 350.90 4067.65 4002,00 1770.41 -424,24 6016821.87 551502.61 15.47 1669,85 5022.00 68.50 353.10 4077.80 4012.15 1796.25 -427.88 6016847.68 551498.80 7.54 1694.67 5050.00 72.30 355.90 4087.19 4021.54 1822,50 -430.40 6016873.91 551496.09 16.52 1720.08 5080.00 77,50 354.60 4095.01 4029.36 1851.36 -432.80 6016902.75 551493.49 17.83 1748.08 5112.00 82.40 354.30 4100.59 4034,94 1882.71 -435.84 6016934.07 551490.23 15.34 1778.42 5145.00 84.60 359.60 4104.33 4038,68 1915.44 -437.59 6016966.78 551468.26 17.29 1810.35 5175.00 85.70 3.60 4106.87 4041.22 1945.31 -436.75 6016996,68 551468,88 13.78 1839.92 5210,00 84.50 5.00 4109.86 4044.21 1980.08 -434.14 6017031.45 551491.26 5.26 1874.61 5247.00 86.70 10.70 4112.70 4047.05 2016.61 -429.10 6017068.01 551496.04 16.47 1911.46 5292.00 87.50 18.00 4114.98 4049.33 2060.12 -417.97 6017111.59 551506.87 16.30 1956.24 5322.00 86.90 22.20 4116.44 4050.79 2088.25 -407.67 6017139.79 551516.96 14.13 1985.74 5362.00 86.80 28.70 4118.64 4052.99 2124.30 -390.52 6017175.95 551533,87 16.23 2024,21 5395.00 86.50 33.00 4120.57 4054.92 2152.57 -373,63 6017204,34 551550.56 13.04 2054.99 BP Amoco Baker Hughes INTEQ Survey Report CompaBy: BP Amoco Date: 6/19/2001 Time: 10:35:48 Page: 2 Field: Milne Point Ce-e~laate(NE) l~ereace: Well: MPJ-01, True North Site~ M Pt J Pad Veffteal (31~) Eeference: 4: 01 1111111999 15:00 65.7 We~, MPJ-01 Seellen (VS) Eefemace= Well (0.00N,0.00E,10.00Azi) Wdtlmt~: MPJ-01AL1 Sam~'Ql~latfea Me~ed: Minimum Curvature Db: Oracle Survey MD lucl Azlm TVD SSTVD N/~ E/W MapN MapE DLS VS n deg deg n fl ~ ~ n ~ deg/100~ ff 5424.00 86.80 35.30 4122.27 4056.62 2176.53 -357.38 6017228.41 551566.64 7.98 2081.41 5459.00 87,70 38.10 4123.95 4058.30 2204.56 -336.49 6017256.57 551587.33 8.39 2112.63 5489.00 87.70 41.10 4125.15 4059.50 2227.65 -317.38 6017279.80 551606.27 9.99 2138.70 5522.00 89,30 44.00 4126.01 4060.36 2251.95 -295.08 6017304.25 551628.40 10.03 2166.50 5551.00 90.10 46.10 4126.17 4060,52 2272.44 -274.55 6017324.88 551648.78 7.75 2190.24 5560.00 89.20 49.20 4126.34 4060.69 2291.97 -253.12 6017344.56 551670.07 11.13 2213.20 5612.00 89.70 53.60 4126.65 4061.00 2311.93 -228.12 6017364.69 551694.93 13.64 2237.19 5641.00 91.10 51.90 4126.45 4060.80 2329.48 -205.04 6017382.40 551717.89 7.59 2258.49 5670.00 89.80 47.20 4126.22 4060.57 2348.29 -182,98 6017401.36 551739,82 16,81 2280.84 5700.00 87.10 43.60 4127.03 4061.38 2369.34 -161.63 6017422.56 551761,01 15.00 2305.28 5731.00 87.70 40.20 4128.44 4062.79 2392.39 -140.95 6017445.74 551781.53 11.13 2331.56 5762.00 85.90 37.30 4130.17 4064.52 2416.52 -121.58 6017470.01 551800.73 11.00 2358.70 5792.00 85.80 36.40 4132.34 4066.69 2440.46 -103.64 6017494.08 551818.50 3.01 2385.39 5820,00 89.50 35.60 4133.49 4067,64 2463.09 -87.20 6017516,62 551834.79 13,52 2410.53 5850.00 90.30 32.80 4133.54 4067.89 2487.90 -70,34 6017541.74 551851.47 9.71 2437.89 5880.00 90.10 27.60 4133.44 4067.79 2513.82 -55.25 6017567.76 551866.37 17.35 2466.04 5909.00 89.30 24.00 4133.59 4067,94 2539.93 -42.63 6017593.95 551878.81 12.72 2493.94 594 1.00 88.70 20.60 4134.15 4068.50 2569.52 -30.49 6017623.63 551890.74 10.79 2525.19 5970.00 88.90 16.60 4134.75 4069.10 2597.00 -21.25 6017651.17 551899.79 13.81 2553.85 6000.00 88.70 14.00 4135.38 4069.73 2625.93 -13.33 6017680.14 551907.51 8.69 2583.72 6030.00 88.10 10.00 4136.22 4070.57 2655.25 -7.10 6017709.51 551913.53 13.48 2613.68 6060.00 88.50 6.60 4137.11 4071.46 2664.92 -2.77 6017739.21 551917.66 11.41 2643.65 6090.00 88.70 4.70 4137.84 4072.19 2714.77 0.18 6017769.07 551920,40 6.37 2673.55 6128.00 88.50 0.90 4138,77 4073.12 2752.70 2.04 6017807.01 551921.99 10.01 2711.24 6155.00 88,60 358.20 4139.46 4073.81 2779.69 1,82 6017834.00 551921.59 10.00 2737.78 6180,00 88.50 352.60 4140.09 4074.44 2804,59 -0,18 6017858.68 551919.41 22.40 2761.95 6212.00 89.10 349.30 4140.76 4075.11 2836.18 -5.21 6017890.43 551914.16 10,48 2792,19 6241.00 89.70 346.10 4141.06 4075.41 2864.51 -11.39 6017918.71 551907.79 11.23 2819.01 6270,00 90.30 343.70 4141.06 4075.41 2892.51 -18.94 6017946.65 551900,04 8.53 2845.27 6300.00 89.90 336.70 4141.01 4075.36 2920.72 -29.10 6017974.79 551889.69 23.37 2871.29 6335,00 88.90 331.80 4141.38 4075.73 2952.23 -44,30 6018006.19 551874.27 14.29 2899.68 6366.00 88.90 333.70 4141.97 4076.32 2979.78 -58,49 6018033.64 551859.89 6.13 2924.36 6406.00 89.20 343.30 4142.64 4076.99 3016.95 -73.13 6018070.70 551844.99 24.01 2958.42 6435.00 90.00 347,10 4142.84 4077,19 3044.98 -80.54 6018098.68 551837.39 13.39 2984.74 6465.00 90.90 348.10 4142.60 4076.95 3074.28 -86.98 6018127.93 551830.75 4.48 3012.47 6509,00 91.00 353.90 4141,87 4076.22 3117.71 -93,86 6018171.31 551823.57 13.18 3054.05 6551.00 91.70 358.20 4140,88 4075.23 3159,59 -96.75 6018213,16 551820.38 10.37 3094.79 6584.00 89.90 0.80 4140.42 4074.77 3192.58 -97.04 6018246.15 551819.86 9.58 3127.23 6629.00 89.90 5.30 4140.50 4074.85 3237.51 -94.64 6018291.09 551821.94 10.00 3171.89 6665.00 88.10 9.90 4141.13 4075.48 3273.18 -89.88 6018326.78 551826.45 13.72 3207.84 6695.00 85.80 11.30 4142.73 4077.08 3302.62 -84.37 6018356.26 551831.76 8.97 3237.79 6726.00 85,20 16.20 4145.16 4079.51 3332.63 -77.03 6018386.32 551838.89 15.88 3268.62 6759.00 64.90 19.00 4148.01 4082.36 3363.96 -67.09 6016417.72 551648.61 8.50 3301.21 6785.00 85.60 19.00 4150.16 4084.51 3388.46 -58.66 6018442.27 551856,87 2.69 3326.80 6816.00 88.20 26.90 4151.84 4086.19 3416.94 -46.59 6016470.83 551868.74 26.79 3356,94 6844.00 90.60 33.90 4152,13 4086.48 3441,07 -32.44 6018495.06 551882,73 26.43 3383.16 6882,00 91.30 34.90 4151.50 4085.85 3472.42 -10.97 6018526.55 551903.97 3.21 3417.76 6925.00 90.70 37,70 4150.75 4085.10 3507.07 14.48 6018561.37 551929.18 6.66 3456.30 6958.00 87.90 41.40 4151.16 4085.51 3532.50 35.49 6018586.95 551950.00 14.06 3485.00 6992,00 89.00 43.90 4152,08 4086.43 3557.50 58.51 6018612.11 551972.85 8.03 3513.61 7021,00 90.70 40.50 4152.15 4086.50 3578.98 77.99 6018633.72 551992.17 13.11 3538.15 7053.00 89.90 36.70 4151.98 4086.33 3603.98 97.95 6018658.86 552011.96 12.14 3566.24 BP Amoco Baker Hughes INTEQ Survey Report INTEQ Comlmay: BP Amoco Da~e: 6/19/2001 Time: 10:35:48 Page: Field: Milne Point Co-ordl~ate(NE) Refereace: Well: MPJ-01, True Norlh Site: M Pt J Pad Vertical (TV1))Referee, ce: 4: 01 1111111999 15:00 65.7 Well: MPJ-01 Sectlo,, (VS) Reference: Well (0.00N,0.00E,10.00Azi) We#patla: MPJ-01AL1 Smrvey Calcmlatioa Method: Minimum Curvature Db: Oracle Survey MD l~cl ,~zim TVD SSTVD N/S E/W MapN MapE DLS VS 7084.00 87.90 34.00 4152.58 4086.93 3629.26 115,88 6018684.26 552029.71 10.84 3594.24 7112.00 87.90 32.30 4153.61 4087.96 3652.69 131.18 6018707.79 552044.84 6.07 3619.97 7142.00 88.61 28.40 4154.52 4088.87 3678,56 146.33 6018733.76 552059.81 13,21 3648.08 7173.00 90.20 25.80 4154.84 4089.19 3706.15 160,44 6018761.45 552073.73 9.83 3677.71 7206.00 89.70 21.10 4154.87 4089.22 3736.41 173.57 6018791.80 552086.65 14.32 3709.79 7238.00 88,80 16.40 4155.29 4089.64 3766,71 183,86 6018822.16 552096.72 14.95 3741.41 7272.00 89.00 14.20 4155.94 4090.29 3799.49 192,83 6018855.01 552105.46 6.50 3775.25 7299.00 88.30 11.80 4156.58 4090,93 3825.79 198.90 6018881.34 552111.35 9.26 3802.21 7331.00 88,80 7.30 4157.39 4091.74 3857.33 204.20 6018912.91 552116.43 14.14 3834.19 7364.00 88.00 4.30 4158.31 4092.66 3890.14 207,54 6018945.75 552119.54 9.41 3867.08 7395.00 88.60 1.10 4159.23 4093.58 3921,09 209,00 6018976.70 552120.78 10.50 3897.81 7429.00 88,60 356.90 4160.06 4094.41 3955.07 208.40 6019010.67 552119.95 12.35 3931.17 7463,00 90.30 355,30 4160.39 4094.74 3988.99 206.09 6019044.57 552117,40 6.87 3964.17 7497.00 91,30 348,70 4159,91 4094.26 4022.63 201.36 6019078.18 552112.44 19.63 3996.49 7535.00 90.30 339.70 4159.38 4093.73 4059,15 191,03 6019114.62 552101.85 23.83 4030.66 7574.00 87.80 333.30 4160.03 4094.38 4094.89 175.49 6019150.25 552086.07 17,61 4063.16 7607.00 88.80 331,00 4161.01 4095.36 4124.06 160.08 6019179.30 552070,46 7.60 4089.20 7637.00 89.70 332,80 4161.40 4095,75 4150.52 145,95 6019205.66 552056.15 6.71 4112.80 7668.00 91.10 340,60 4161.18 4095.53 4178.96 133,70 6019234.02 552043,70 25.56 4138.69 7711.00 90.50 348,10 4160.58 4094.93 4220.34 122,11 6019275.31 552031,82 17.50 4177,42 7741.00 87.90 350.00 4161.00 4095.35 4249.78 116.41 6019304.71 552025.92 10.73 4205.43 7777.00 88.50 351,50 4162,13 4096.48 4285.30 110.63 6019340,18 552019.89 4.49 4239.40 7812.00 88.50 355,10 4163.05 4097.40 4320,04 106,55 6019374.89 552015.56 10.28 4272.91 7844.00 89.30 0,10 4163,66 4098.01 4352.00 105.21 6019406.63 552014,00 15,82 4304.15 7876.00 89,40 5.50 4164.03 4098.38 4383.94 106.77 6019438.79 552015.34 16,88 4335.88 7916,00 89.20 8,90 41 64,51 4098.86 4423.62 111.78 601 9478.49 552020.08 8,51 4375.83 7950,00 89,20 8,90 4164.99 4099.34 4457,21 117.04 6019512.11 552025,10 0,00 4409.82 2800 2900 3080 3100 ,~ 3200 ~3300 ~ 3600 737oo 3800 3900 4000 41oo 4200 4300 360( © Z2000 140C 1500 1600 1700 1800 1900 2000 2100 2200 2300 24OO 2500 260O 2700 2800 2900 30OO 3100 32£ 3300 3400 3bO0 3600 3700 3800 39OO 4008 4100 420O 4300 44( - 4500 4800 4700 4800 4900 5000 5100 5200 Vertical Sectio~ at ~0.00° ~9/2001 10:37 Transmittal Form Baker Atlas Canada GEOSciences Centre To: State of Alaska, Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Attention: Lisa Weepie Reference: Milne Point Unit North Slope, Alaska MPJ-01 A-L1 · . Contains the following: I - Film (Wellbore Profile GR-MWD-Measured Depth) I - Fihn (Propagation Resistivity-GR-MWD-Measured Depth) 1 - Film (PropagatiOn Resistivity, GR-MWD, Tme Vertical Depth) 1 - Prim ( Depth) ~ Print: (ProPagation'ResistiVity~GR:MWD-Tme Vertical Depth) 1 - LDWG Format Disk LAC Reference Number: 14.180 Sent By: JosefBerg Received By~ Date: July 5, 2001 Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (403) 537-3767 Baker Atlas #1300, 401-9th Ave. S.W. Calgary, Albert a, Canada T2P 3C5 Direct: (403) 537-3752 FAX: (403) 537-3767 RECEiVEDiii, iI JUL 0 9 2001 ALASKA OIL AND GAS CONSERYA~ION COMMISSION TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Mark Johnson CT Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Unit- MPJ-01AL1 BP Exploration (Alaska) Inc. Permit No: 201-021 Sur Loc: 2622'SNL, 3378'WEL, Sec. 28, T13N, R10E, UM Btrnhole Loc. 2198'NSL, 2937'WEL, Sec. 21, T13N, R10E, UM Dear Mr. Johnson: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does nOt exempt you from obtaining additional permits required by law from other governmental~agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The permit is for anew wellbore segment of existing well MPJ-01A, Permit No 199-111, API 50-029-22070-01. ProdUction should continue to be reported as a function of the original API number stated above. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Julie M. Heusser Commissioner BY ORDER OF THE COMMISSION DATED this ~t ~ day of February, 2001 dlf/Enclosures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALAS KA %~//.ct ALASK,Ut"' L AND GAS CONSERVATION COMIC" 31ON PERMIT TO DRILL ~ 20/LAC 25.005 --~ I [] Exploratory [] Stratigraphic Test [] Development Oil 1 a.. Type of work [][] Re-EntryDrill [][] RedrillDeepen 1 b. Type of well [] Service [] Development Gas [] Singlg Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 65.65' Milne Point Unit / Schrader 3. Address 6. Property Designation Bluff P.O. Box 196612, Anchorage, Alaska 99519-6612 ~,Z~C~,~r'ibADL... 315848 4. Location of well at surface 7. Unit'or Property Name 11. Type Bond (See 20 AAC 25.025) 2622' SNL, 3378' WEL, Sec. 28, T13N, R10E, UM Milne Point Unit At top of productive interval 8. Well Number 1127' SNL, 3692' WEL, Sec. 28, T13N, R10E, UM MPJ-01AL1 Number 2S100302630-277 At total depth .9. Approximate spud date 2198' NSL, 2937' WEL, Sec. 21, T13N, R10E, UM 03/01/01 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 025906, 2227' MDI No Close Approach 1280 8320' MD / 4123' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 4750' MD Maximum Hole Angle 89 o Maximum surface 1600 psig, At total depth (TVD) 4000' / 2000 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casin,q Weiqht Grade Couplin,q Lenqth MD 'I'VD MD 'TVD {include sta,qe data) 3-3/4" 2-7/8" 6.16# L-80 ST-L 3560' 4760' 4034' 8320' 4123' Uncemented Slotted Liner l-t v I'" L./ 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary JAN ?, :3 2_0 01 Total depth: measured 8034 feet Plugs (measured) true vertical 4141 feet Alaska Oil & Gas Cons. Commission Effective depth: measured 8034 feet Junk (measured) Anchorage true vertical 4141 feet Casing Length Size Cemented MD TVD Structural Conductor 70' 13-3/8" 500 sx Permafrost 'C' 105' 105' Surface 2374' 9-5/8" 945 sx PF 'E', 200 sx E 2409' 2364' Intermediate Production 3605' 7" 393 sx Class 'G' 3640' 3502' Liner 3623' 4-1/2" 97 sx Class 'G' 3512' - 7135' 3383' - 4108' Perforation depth: measured 4810' - 4852', 4892' - 5301', 5340' - 5743', 5784' - 6195', 6236' - 6644', 6682' - 7091' true vertical 4035' - 4035', 4035' - 4049', 4048' - 4065', 4068' - 4095', 4096' - 4093', 4093' - 4106' '~0. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Mark Johnson, 564-566~ Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is,true anC'co,ect,to the best of my knowledge .'. ;: ~':.-.- .. Signed Mark Johnson ~,~¢~~~/l~¢.,,¢,,,~._~TDrillingEngineer Date / 'Z-~ O/ : ....' :!..: :." :...':" :. ~."..".';: ...,'.,~./,..'":,::'...':':,: ..Comm'isSlon.',U,se,..On,ly :, ... '.':...: :.:.;.;..:.:...'.';::.':::::':.....:...,; ... :'.:'.:. ~.'::" ';, ;.'.: .:':./.,....;.'i Permit Number I APl Numb~'/ ] Approval Date I See cover letter ~ / ' C.~ 7._/' 1 50- 029-2:;~97,,0'-60 (? ,.:~ -".-'~, 1 "~ i for other requirements Conditions of Approval: Samples Requi~e~ [] Yes I[] No Mud Log Required [] Yes [] No Hydrogen Sulfide Measures '[] Yes [] No Directional Survey Required [~ Yes [] No Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K ',~3.5K psi for CTU Other: OPJGINAL $~GNED BY by order of Approved By ,.t M Hc.H.~.~r Commissioner the commission Date '~ '''''-~ I- el Form 10-401 Rev. 12-01-85 ORIGINAL Submit In Triplicate BPX Milne Point J-01aL1 Sidetrack - Coiled Tubing Drilling Summary of Operations: A horizontal lateral (L1) will be added to J-01a to target lower Schrader Bluff OB reserves. The existing Schrader Bluff OA horizontal interval will remain open for production. Nabors 4ES will pull the existing ESP completion prior to Coiled Tubing Drilling (CTD) arrival. CTD Drill and Complete Lateral (L1) pro.qram: Planned for March 01, 2001 1) Set whipstock at 4750' (in 4 %" liner at 87° wellbore inclination) - service coil 2) Mill window through 4 %" and mill 5' of openhole - service coil. 3) MIRU CTD rig - Drill horizontal lateral L1 from window to TD targeting Schrader Bluff OB sand interval as per attached directional plan. 4) Complete with slotted liner from TD to ~10' outside of window. Mud Program: · Steps l& 2: Seawater · Steps 3&4: FIo-Pro (9.6-10.1 ppg) RECEIVED Disposal: · No annular injection on this well. · Class II liquids to KRU 1R Pad Class II disposal well · Class II drill solids to PBU DS-4 Grind & Inject · Class I wastes will go to Pad 3 for disposal. Alaska Oil & Gas Cons. Commission Anchorage Casing Program: · 2 7/8", 6.16#, L-80, STL slotted/pre perforated liner will be run from TD to approximately 4760'. Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2000 psi. Directional · See attached directional plan · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · A Gamma Ray log will be run over all of the open hole section. · Resistivity logging in sections of the openhole Hazards No significant faults are expected to be crossed, lost circulation risk is Iow. Res. pressure is 9.6 ppg. The latest H2S reading (Feb 2000) on J-01a was <2ppm. Highest H2S on the pad is 9.6 ppm (J-18). Reservoir Pressure Res. pressure is approx. 2000psi @ 4000ss (9.6 ppg). Max. surface pressure with gas (0.1 psi/fi) to surface is 1600 psi. J-01aL1 Potential Drilling Hazards Post on Rig , . Please perform pre-job Hazard ID and Safety meetings prior to every change in work scope during the operation. Also, if things don't feel right shut down the operation and discuss the situation before making the next operational move. SAFETY FIRST. H2S is not expected on this well. The latest H2S test on J-01a was <2ppm. Maximum H2S measured on the pad was from well J-18 at 9.6 ppm. 3. BHP is expected to be approx. 2000psi (9.6ppg) @ 4000'ss. 4. Maximum anticipated well head pressure wi full column of gas is 1600psi. 5. Lost circulation risk is Iow with no significant faults expected to be penetrated. RECEIVED JAN 2,3 ;~001 Alaska Oil & Gas Cons. Commission Anchorage Tree: WKM 29/16" 5M J-01A KB elev. = 70.2' Wellhead: 11" x 11' 5M tbg. spool, DF elev. 68.7' 11" x 2 7/8" 8 rd EUE (top & bottom) ~ GL elev. = 35.2' WKM tbg. hng. w/2.5" 'H' BPV -" r'" '"'= '" -' "' profile. ,=1 ~ 13 3/8", 54.5 ppf, K-55 Butt Wold ,~'~ ~ sCii; ~npCo°c :e:/ .... 9 5/8", 36 ppf, K-55, Btrc. ~'0'~ ~ Ray chem heat trace 2 7/8" 6.5 ppf, L-80. 8 rd EUE tbg.. (drift ID = 2.347", cap. = 0.00592 bpf) sCi~em;o°c~e7t/~''B~ glm 7" 26 ppf, L-80, Btrc. production casing ( drift ID = 6.151", cap. = 0.0383 bpf) Bake se try gauge KOP @ 1500' Centrilift GC2200 GPMTAR 1:1 Max Hole Angle: 26° @ 2500' MD Hole angle through parrs = 20 deg. ~n;,~TAa;~;m gas sop. i 3,365, Centrilift Seal section GSB3 DB Centrilift Motor 171 hp KMH 2390 v. I / 44 amps ! Centralizer 4.5" od I 3,399' I Baker 5"x7" HMC Liner hng' 13'512' I I I Baker guide shoe 7,135' Baker HMCV Cementing valvel 4'682' I ~,X BakerCTC20'PZPESP ~,~, ~ ~ ~ ~ ~ ~ Open Size SPF Interval Open/Sqzd 4.5" 12.6# L-80 IBT Slotted liner 6-1/8" hole TD @ 8034' 4-112" SLOTTED INTERVALS ( refer to tubing tally for details ) 4810' - 4852' Open 4892' - 5301' Open 5340' - 5743' Open 5784' - 6195' Open 6236' - 6644' Open 6682' - 7091' Open Old bottom hole location ~ 7" HES camenf retainer at 3669' PERFORATION SUMMARY ".~"' ' '" '": ','. ~,"i'""" ...~,.,~.15~)~ ~;. HES Versatdeve packer @ 3923' MD REF LOG: DIL- SFL 12/13/90 · (3.88o' ~O) Size SPF Interval Open/Sqzd ';~ i" 92'- 20 ga screen ~~!~ HES Versatrleve packer @ 4138' MD I "N' Sands 42' -20 Ga screen 4010'-4036' HES Versatrieve packer ~ 4223' MD 4.5' 24 4042'-4082' Sqzd (3.88" ID) 4,5" 24 4098'-4128' Sqzd&~L,~,' ~,.~: 34'- 20 ga screen 4.5" 24 "O' Sands $qzd ~-~,~ HES BWD Sump packer @ 4290' MD 4192'-4222' e~____~.,~'~l_....._ (4.00' ID) 4.5" 12 4258'-4282' Sqzd~~ 4.5" 12 ! 4044-4065 Sqzd 4,5' 12 4069-4089 Open 4.5' 12 4188-4218 Open 4,5' 12 4260-4280 Open 4.5' 12 Open ~ 100 mesh sand to 4218' 7" float collar (PBTD} '~~k 7' casing shoe DATE REV. BY COMMENTS MILNE POINT UNIT 04/04/95 DBR RWO/ MULTIPLE FRAC PACKS WELL J-01A APl NO: 50-029-22070 02/21/97 JBF ESP Replacement by Nabors 4ES 12/05/99 MD( S/T & Comp, Nabors 4-ES & Nordic #3 BP EXPLORATION (AK) Size SPF Interval Open/Sclzd 4-112" SLOTTED INTERVALS 4810' - 4852' Open 4892' - 5301' Open 5340' - 5743' Open 5784' - 6195' Open 6236' - 6644' Open 6682' - 7091' Open Size SPF Interval Open/Sqzd "N' Sands 4010'-4036' 4.5'24 4042'-4082'Sqzd 4,5" 24 4098'-4128'Sqzd 4.5"24 "O' Sands Sqzd 4192'-4222' 4.5"12 4258'-4282'Sqzd 4.5"12 Sqzd 4044-4065 4,5'12 4069-4089 Open 4.5'12 4188-4218 Open 4,5'12 4260-4280 Open 4.5'12 Open RECEIVED Alaska Oil & Gas Cons. Commission Anchorage REG Alaska Oil & ( i ..... KB elev. = 70.2' Tree:WKM29/16"5M MP J-01A L1 Propo d DF elev.:68.7' ~--~ead: 11, x 11" 5M tbg. spoo, 11" x 2 7/8" 8 rd EUE (top & bottom) GL elev. = 35.2' WKM tbg. hng. w/2.5" ,H, BPV I I : profile. [ 13 3/8", 54.5 ppf, K-55 Butt Weld : I I I I 9 5/8", 36 ppf, K-55, Btrc. ] 2409' I i I [ ' I I I after CID Sidetrack 7" 26 ppf, L-80, Btrc. production casing I ]~r~ ( drift ID = 6.151", cap. = 0.0383 bpf ) I KOP @ 1500' Max Hole Angle: 26° @ 2500' MD Hole angle through perfs = 20 deg. IFIowby Whipstock set in 4 1/2" : ~V~..i~) Lslotted liner at 4750' MD 'j ~ / 4.5" 12.6# L-80 IBT Slotted lin.e,r I I / Baker guide shoe 7,135 ,~orageC°ns' cor~tai{~nS"x7" HMC Liner hng. 3,512' _ 6-1/8" hole TD @ 8034' - Baker .MCV Cementing valve 4,682' i, XX 7~-~ ~ 899' ! ~,~, I ~ ~ ~ ~ ~ open Baker OTC 20' PZP ESP 4,704' ; '~l~..~::!i~i!~ ~_~L_ Size SpF Interval Open/Sqzd ! ~~ [ j2 ~/8. pre 'perforated ' 4-112'" sLoTTED INTERVALS ...... Top of hner ~ , 4810'-4852' Open Top of liner I i~ [ /I liner 4760-8320' dropped, off I ~iliiii~~ ...... ' .......... ' ' 4892' - 5301' Open at 4760' at 4760 J ~!ii::. ': ": ............................................ ' 5340' - 5743' Open 5784'-6195' Open ~ ..... : ................ ~~!~::::iii~i~ ...... ~ .......... ~::' 6682' - 7091' Open TD 8320 J-0 lA L 1 lateral 3 3/4" openhole DATE REV. BY COMMENTS MILNE POINT UNIT 04~04~95 DBR RWO/ MULTIPLE FRAC PACKS WELL J-01A APl NO: 50-029-22070 02/21/97 JBF ESP Replacement by Nabors 4ES 12/05/99 MDO S/T & Comp. Nabors 4-ES & Nordic #3 , , , 1/21/01 MOJ Proposed lateral L1 addition BP EXPLORATION (AK) I I I I I Size SPF Interval Open/Sqzd 4-112'"sLOTTED INTERVALS 4810'-4852' Open 4892'-5301' Open 5340'-5743' Open 5784'-6195' Open 6236'-6644' Open 6682'-7091' Open BP Amoco WELLPATH DETAILS Plan#3 MPJ-01AL1 5OO292207060 Parent Wellpath: MPJ-OIA Tie on MD: 4750.00 Vertical Section Origin: Slot - 01 (0.00,0.00) Vertical Section Angle: 10.00° Rig: Depth Reference: 4: 01 1111111999 15:00 65.65fl REFERENCE INFORMATION Co-ordinate (N/E) Reference: Well Centre: MPJ-01, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: Slot - 01 (0.00,0.00) Measured Depth Reference: 4: 01 11/11/1999 15:00 65.7 Calculation Method: Minimum Curvature ANNOTATIONS No. TVO MDAnnotation 2 39~2.97 4675.79 T~-in Poin! 396&23 4750.00 IGck-off Point 3 4OO4.O0 4950.00 1 4 4041.71 5170.00 2 407~.00 ~270.00 ~ 4088.06 6810.00 65 4100.01 7410.00 4123.19 8320.00 O~p LEGEND ~ MPJ-01 (MPJ-01) -- MPJ-01 (MPJ-01A] ...... MPJ- 11(MPJ-t Plamf3 MP,N01AL1 T t\M Azimuths to True NoAh Magnetic NoAh: 26.37° Magnetic Field Strength: 57439nT Dip Angle: 80.77° Date: 1/22./2001 Model: BGGM2000 Wel~pa~: (MPJ-O1/Pla~¢3 MPJ-O1AL1) Cmaled By;. ~ Po~n~s Date: 1to_r2001 · -.:::i .. ::;:::;::: ". ::i ';"'::'~.';!::~i~ ';": "~ ': ; ; ; i i i · .:, · ::!:::;::i: : ':?.. -~: - ! .. :::::::ii:ii:--~ii:::!-:? · '::':".i". .......... !"-":'":"i'i i' ; "!': '"':"" i" '" '"' i i .... ! "i ' '; .... i > ~ . .... ~ ~ .. , · :.':&.::...~::~:i.::.:..L.:i.i... · ..:.~..:.~.: .......... i.....;..~..L.i~LZ..i..: ...... ~ u,.,-.; ,,,.- ~.:~ .... ~.., ~ Up.,~,,~.:. · -~ . . -:...- · :::::::::::::::::::::::::: :: : .::::?:' .:; _::: .... ....... ..... ..~ · · .:::%::: . . ::. ' '-.. · ..:::.L.:..L....:..:~....::L.: ........... ~.~.~ ......... ~.......:..~..:..~..::.:.....~..~ ....... ~ ................. ~ ... ~ ' :, .. ::~ .~ · . ::::::?:: · :::: . .. ====================== . ~.. : :::::::~ ~ ,:~~-' ~ ,, : ~::..::~.;:::~ . .:.. :. ::~: ~ N ~ :;::~ '~ :: ' ~:..~.;~ ~;~::~ : ~..,L,, ; , ..... : .... ~. ; ...... ........... ';: ::'::: ' :' -:-;::: ~ ' . ; ~ ~; ~:: ~: :'¢': .." :::,.'.. . .L.....:..:..~....:::. .:..;.:::... :: ~.:.....:.:.:i...: ...... ~ ....... ': .......... ; ........ ; : .... ~ · : .... . . ;:...: .... ~, :: :..:::~:: : · ::: :~-.. :::::::::::::::::::::::::::::::: . ::::.:.:..:.. :::~: ::: :: ~ : ~ :: ~ : ; .;'. ::,:::;::.: . :: : . %, ::::::::::::::::::::::::::::::::::::::: ::.:...: ........... ::::::::::::::::::::::::::::::::: ......... ~...: ....... > ....... ..; ............ ; ......... : ....... ?....: .; ~ 1~ 14~ 1500 1~ 1~ 18~ 1~ 2~ 21~ ~ 23~ 24~ 25~ 26~ 27~ 28~ ~ 3~ 31~ 32~ 33~ :~ ~ 3~ 37~ 38~ 3~ ~ 41~ 42~ 4~ ~ 4~ 4~ 47~ 48~ 49~ ~ 51~ 52~ Vedical Section at 10.00" [JO~in] m Plot 1/22/2001 2:50 PM BP Amoco Baker Hughes INTEQ Planning Report Company: BP Amoco Date: 1/22/2001 Time: 14:39:36 Page: 1 Field: Milne Point Co-ordinate(NE) Reference: Well: MPJ-01, True North Site: M Pt J Pad Vertical (TVD) Reference: System: Mean Sea Level Well: MPJ-01 Section (VS) Reference: Well (0.00E,0.00N,10.00Azi) L._W_ ..e!lp._a_t__h.!__ _P_!~_n..?__ .M..P_ ~.-_?. ~.L..I_ ......................................................................................................... ~.u_. _rv_~_.._C_a.!_c_~!.a.ti_' °n.. M_ e_ t.h_ .0_d? ........ _M.!.~ i..m_ ._u_ m...~ _u. ~_a~u~ ? ....................... D..? :__.?.. _m..¢_l.e.. ................ Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: BGGM2000 , Site: M Pt J Pad ..... '"1 TR-13-10 UNITED STATES · North Slope Site Position: From: Map Position Uncertainty: 0,00 ft Ground Level: 0,00 ft Well: MPJ-01 MPJ-01 Well Position: +N/-S 1636.04 ft +E/-W 515.39 ft Position Uncertainty: 0.00 ft Northing: 6013415.23 ft Latitude: 70 26 50.647 N Easting: 551435.10 ft Longitude: 149 34 49.503 W North Reference: True Grid Convergence: 0,40 deg Slot Name: 01 Northing: 6015054.63 ft Latitude: 70 27 6.737 N Easting: 551939.14 ft Longitude: 149 34 34.366 W Wellpath: Plan#3 MPJ-01AL1 Drilled From: MPJ-01A 500292207060 Tie-on Depth: 4750.00 ft Current Datum: 4: 01 11/11/1999 15:00 Height 65.65 ft Above System Datum: Mean Sea Level Magnetic Data: 1/22/2001 Declination: 26.37 deg Field Strength: 57439 nT Mag Dip Angle: 80.77 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 0.00 0.00 0.00 10.00 Plan: Principal: Targets ."Name. Plan #3 Date Composed: 1/22/2001 Version: 1 Yes Tied-to: From: Definitive Path '' . ' ' . ..... ':' :.: : MaP :':.::i.. ~Map':'' "." <---'Latitude.-.-->. <---LongitUde"~"> "::' ···DescriPtion · .: TVD .... : '+N/-S · · -¢E/~W:..' :North'ing':' iE.aSt.ing ' .' : i: .'Deg. Min. Sec Deg:.Min .Sec' ': Annotation ... 4675,79 4950,00 5170,00 5670,00 6270,00 6810,00 7410,00 7810,00 8320,00 Plan Section 3962.97 Tie-in Point Kick-off Point 4004.00 1 4041.69 2 4059.31 3 4076.15 4 4088.14 5 4100.09 6 4109.21 7 4123.30 TD Information RECEIVED JAN 2, 3 2001 Alaska Oil 8, Gas Cons. Commission Anchorage .'.'MD "' Incl. · . Azim ..... ft..' deg '...."deg' 4675,79 84,36 332,20 4712,63 86,17 333,45 4743,06 86,83 334,25 4750,00 87,27 334,12 4950,00 72,15 347,47 5170,00 88,17 2,84 5670,00 88,06 52,87 TVD .. 3962.97 3966.01 3967.87 3968.23 4004.00 4041.69 4059.31 -~N/~S 1480.85 1513.51 1540.77 1547.01 1731.68 1946.35 2374.24 '+E/-W · 'DLS: .Build: · Turn= ft :.. deg/l~OOftdeg/lOOft, deg/ioOft -306.44 0.00 0.00 0.00 -323.21 5.96 4.91 3.39 -336.59 3.40 2.17 2.63 -339.61 6.61 6.34 -1.87 -404.52 10.00 -7.56 6.68 -421.99 10.00 7.28 6.99 -195.86 10.00 -0.02 10.01 TFO deg 0.00 34.59 50.45 343.56 140.00 45.00 91.00 Target· ObP BP Amoco Baker Hughes INTEQ Planning Report Company: BP Amoco Date: 1/22/2001 Time: 14:39:36 Page: 2 Field: Milne Point Co-ordinate(NE) Reference: Well: MPJ-01, True Norlh Site: M Pt J Pad Vertical (TVD) Reference: System: Mean Sea Level Well: MPJ-01 Section (VS) Reference: Well (0.00E,0.00N,10.00Azi) .... .W_e.!.l?a_t.!~.! _.._ ,f!.~ __~_ _. M _?~.'_ .O_.!_.A. Iz.! ? ~...~...e.~?a!~!~t!o.n~ ?!~_ et_h.o.~ ! ............. M i..n.i m.~_(~ ~ ~t_U_? ................ ~!..___0_ .~_ _c_.?._ ............ Plan Section Information L ............... __ff. ........................ ~l_~}.g._ .................. ~_e.?_ ............................ _f,! .................................. ,?. .......................... ._ft_ ................... .d,...e..,g_(_!. _O_,.O_._ff,....~l.~_g.! !_ 0 _0~_' deg/100ft deg '\ ' 6270.00 89.03 352.86 4076.15 2901.98 26.59 10.00 0.16 -10.00 -90.00 ; 6810.00 88.62 46.87 4088.14 3391.14 203.28 10.00 -0.08 10.00 91.00 17410.00 89.31 346.86 4100.09 3939.35 369.42 10.00 0.12 -10.00 -90.00 7810.00 88.19 26.86 4109.21 4328.37 416.18 10.00 -0.28 10.00 92.00 '~ 8320 00 88 86 335.84 4123.30 4821.37 427.74 10.00 0.13 -10.00 -90.00 ....... : ............ -' ............................................................................................. :~,a.OiL&Gas COn Survey Anchora( MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool ft deg deg ff ft ft ft ft deg/100ft ft deg 4675.79 84.36 332.20 3962.97 1480.85 -306.44 6016533.16 551622.42 0.00 1405.14 0.00 MWD 4700.00 85.55 333.02 3965.10 1502.26 -317.53 6016554.50 551611.17 5.96 1424.30 34.59 MWD 4712.63 86.17 333.45 3966.01 1513.51 -323.21 6016565.70 551605.42 5.97 1434.39 34.52 MWD 4725.00 86.44 333.78 3966.81 1524.57 -328.70 6016576.72 551599.86 3.40 1444.33 50.45 MWD 4743.06 86.83 334.25 3967.87 1540.77 -336.59 6016592.87 551591.85 3.40 1458.91 50.43 MWD 4750.00 87.27 334.12 3968.23 1547.01 -339.61 6016599.09 551588.79 6.61 1464.53 343.56 MWD 4775.00 85.36 335.73 3969.84 1569.61 -350.18 6016621.60 551578.06 10.00 1484.95 140.00 MWD 4800.00 83.45 337.35 3972.28 1592.43 -360.09 6016644.35 551568.00 10.00 1505.71 139.90 MWD 4825.00 81.54 338.99 3975.54 1615.43 -369.30 6016667.29 551558.62 10.00 1526.76 139.74 MWD 4850.00 79.64 340.64 3979.63 1638.58 -377.82 6016690.38 551549.95 10.00 1548.08 139.52 MWD 4875.00 77.75 342.30 3984.53 1661.82 -385.61 6016713.56 551542.00 10.00 1569.62 139.26 MWD 4900.00 75.87 344.00 3990.23 1685.12 -392.66 6016736.80 551534.78 10.00 1591.33 138.93 MWD 4925.00 74.01 345.72 3996.73 1708.42 -398.97 6016760.06 551528.31 10.00 1613.18 138.60 MWD 4950.00 72.15 347.47 4004.00 1731.68 -404.52 6016783.28 551522.60 10.00 1635.13 138.15 MWD 4975.00 73.93 349.31 4011.29 1755.10 -409.33 6016806.67 551517.63 10.00 1657.36 45.00 rvlWD 5000.00 75.72 351.12 4017.84 1778.88 -413.43 6016830.41 551513.36 10.00 1680.06 44.46 MWD 5025.00 77.52 352.89 4023.62 1802.96 -416.81 6016854.47 551509.81 10.00 1703.19 43.99 MWD 5050.00 79.34 354.65 4028.64 1827.31 -419.47 6016878.79 551506.99 10.00 1726.70 43.58 MWD 5075.00 81.17 356.38 4032.87 1851.87 -421.39 6016903.34 551504.89 10.00 1750.56 43.23 MWD 5100.00 83.00 358.10 4036.32 1876.60 -422.59 6016928.06 551503.53 10.00 1774.71 42.93 rvlWD 5125.00 84.84 359.80 4038.96 1901.45 -423.04 6016952.90 551502.90 10.00 1799.10 42.70 MWD 5150.00 86.68 1.49 4040.81 1926.38 -422.76 6016977.83 551503.00 10.00 1823.70 42.52 MWD 5170.00 88.17 2.84 4041.69 1946.35 -421.99 6016997.80 551503.64 10.03 1843.50 42.28 MWD 5175.00 88.16 3.34 4041.85 1951.34 -421.72 6017002.79 551503.87 10.00 1848.46 91.00 MWD 5200.00 88.12 5.84 4042.66 1976.24 -419.72 6017027.71 551505.70 10.00 1873.34 90.98 MWD 5225.00 88.08 8.34 4043.49 2001.04 -416.64 6017052.52 551508.61 10.00 1898.29 90.90 MWD 5250.00 88.05 10.84 4044.33 2025.67 -412.47 6017077.18 551512.60 10.00 1923.27 90.82 MWD 5275.00 88.02 13.34 4045.19 2050.10 -407.24 6017101.64 551517.66 10.00 1948.24 90.74 MWD 5300.00 87.99 15.85 4046.06 2074.28 -400.94 6017125.86 551523.79 10.00 1973.14 90.65 MWD 5325.00 87.97 18.35 4046.94 2098.16 -393.60 6017149.79 551530.97 10.00 1997.93 90.56 MWD 5350.00 87.95 20.85 4047.83 2121.69 -385.22 6017173.38 551539.18 10.00 2022.57 90.47 MWD 5375.00 87.94 23.35 4048.73 2144.84 -375.82 6017196.59 551548.42 10.00 2046.99 90.39 MWD 5400.00 87.92 25.85 4049.63 2167.55 -365.42 6017219.37 551558.66 10.00 2071.17 90.30 MWD 5425.00 87.92 28.35 4050.54 2189.79 -354.04 6017241.69 551569.88 10.00 2095.04 90.21 MWD 5450.00 87.91 30.86 4051.45 2211.51 -341.70 6017263.49 551582.07 10.00 2118.58 90.11 MWD 5475.00 87.92 33.36 4052.36 2232.67 -328.42 6017284.74 551595.20 10,00 2141.72 90.02 MWD 5500.00 87.92 35.86 4053.27 2253.23 -314.23 6017305.40 551609.24 10.00 2164.43 89.93 MWD 5525.00 87.93 38.36 4054.17 2273.15 -299.16 6017325.42 551624.17 10.00 2186.67 89.84 MWD 5550.00 87.94 40.86 4055.07 2292.40 -283.23 6017344.78 551639.97 10.00 2208.39 89.75 MWD 5575.00 87.96 43.36 4055.97 2310.93 -266.48 6017363.43 551656.59 10.00 2229.55 89.66 MWD 5600.00 87.98 45.87 4056.85 2328.72 -248.93 6017381.33 551674.01 10.00 2250.11 89.57 MWD 5625.00 88.00 48.37 4057.73 2345.72 -230.63 6017398.46 551692.19 10.00 2270.03 89.48 MWD 5650.00 88.03 50.87 4058.59 2361.90 -211.60 6017414.77 551711.11 10.00 2289.28 89.40 MWD 5670.00 88.06 52.87 4059.31 2374.24 -195.86 6017427.22 551726.76 10.01 2304.16 89.25 MWD 5675.00 88.06 52.37 4059.48 2377.27 -191.89 6017430.28 551730.71 10.00 2307.84 270.00 MWD i. Commls , O BP Amoco Baker Hughes INTEQ Planning Report i-[q':i:~'/~ ................ Company: BP Amoco Date: 1/22/2001 Time: 14:39:36 Page: 3 Field: Milne Point Co-ordinate(NE) Reference: Well: MPJ-01, True North Site: M Pt J Pad Vertical (TVD) Reference: System: Mean Sea Level Well: MPJ-01 Section (VS) Reference: Well (0.00E,0.00N, 10.00Azi) Welipath: Plang3 MPJ-01AL1 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool ft dog deg ft ft ft ft ft deg/lOOft ft deg 5700.00 88,06 49.87 4060.33 2392.96 -172.44 6017446.09 551750.04 10.00 2326.66 270.02 MWD 5725.00 88.07 47.37 4061.17 2409.47 -153.69 6017462.74 551768.67 10.00 2346.18 270.10 MWD 5750.00 88.08 44.87 4062.01 2426.79 -135.69 6017480.18 551786.55 10.00 2366.36 270.19 MWD 5775.00 88.09 42.36 4062.84 2444.88 -118.45 6017498.39 551803.66 10.00 2387.17 270.27 MWD 5800.00 88.11 39.86 4063.67 2463.70 -102.03 6017517.32 551819.96 10.00 2408.56 270.35 MWD 5825.00 88.13 37.36 4064.49 2483.23 -86.43 6017536.95 551835.41 10.00 2430.49 270.44 MWD 5850.00 88.15 34.86 4065.30 2503.41 -71.71 6017557.24 551849.99 10.00 2452.93 270.52 MWD 5875.00 88.18 32.36 4066.10 2524.22 -57.88 6017578.14 551863.68 10.00 2475.82 270.60 MWD 5900.00 88.21 29.86 4066.89 2545.61 -44.97 6017599.62 551876.43 10.00 2499.13 270.68 MWD 5925.00 88.25 27.36 4067.66 2567.55 -33.01 6017621.64 551888.24 10.00 2522.81 270.76 MWD 5950.00 88.29 24.86 4068.42 2589.98 -22.01 6017644.15 551899.08 10.00 2546.81 270.84 MWD 5975.00 88.33 22.36 4069.15 2612.88 -12.00 6017667.11 551908.93 10.00 2571.10 270.91 MWD 6000.00 88.37 19.85 4069.87 2636.19 -3.01 6017690.48 551917.76 10.00 2595.62 270.98 MWD 6025.00 88.42 17.35 4070.57 2659.87 4.97 6017714.22 551925.57 10.00 2620.33 271.06 MWD 6050.00 88.47 14.85 4071.25 2683.88 11.90 6017738.27 551932.33 10.00 2645.17 271.13 MWD 6075.00 88.52 12.35 4071.91 2708.17 17.77 6017762.60 551938.04 10.00 2670.11 271.19 MWD 6100.00 88.58 9.85 4072.54 2732.69 22.59 6017787.15 551942.68 10.00 2695.10 271.26 MWD 6125.00 88.64 7.35 4073.14 2757.40 26.33 6017811.88 551946.24 10.00 2720.08 271.32 MWD 6150.00 88.70 4.85 4073.72 2782.25 28.98 6017836.75 551948.73 10.00 2745.02 271.38 MWD 6175.00 88.77 2.35 4074.28 2807.19 30.55 6017861.70 551950.12 10.00 2769.85 271.44 MWD 6200.00 88.83 359.85 4074.80 2832.18 31.04 6017886.69 551950.43 10.00 2794.54 271.50 MWD 6225.00 88.90 357.35 4075.29 2857.17 30.43 6017911.66 551949.65 10.00 2819.05 271.55 MWD 6250.00 88.97 354.86 4075.76 2882.10 28.73 6017936.59 551947.78 10.00 2843.31 271.60 MWD 6270.00 89.03 352.86 4076.15 2901.98 26.59 6017956.44 551945.50 9.98 2862.51 271.64 MWD 6275.00 89.02 353.36 4076.24 2906.94 25.99 6017961.40 551944.87 10.00 2867.29 91.00 MWD 6300.00 88.98 355.86 4076.67 2931.83 23.64 6017986.27 551942.35 10.00 2891.39 90.99 MWD 6325.00 88.94 358.36 4077.13 2956.79 22.38 6018011.22 551940.91 10.00 2915.76 90.95 MWD 6350.00 88.90 0.86 4077.60 2981.78 22.21 6018036.21 551940.57 10.00 2940.34 90.90 MWD 6375.00 88.86 3.36 4078.09 3006.76 23.13 6018061.19 551941.31 10.00 2965.10 90.86 MWD 6400.00 88.83 5.86 4078.59 3031.67 25.14 6018086.11 551943.15 10.00 2989.98 90.81 MWD 6425.00 88.80 8.36 4079.11 3056.47 28.24 6018110.93 551946.07 10.00 3014.94 90.76 MWD 6450.00 88.77 10.86 4079.64 3081.11 32.41 6018135.59 551950.07 10.00 3039.93 90.70 MWD 6475.00 88.74 13.36 4080.18 3105.55 37.65 6018160.06 551955.14 10.00 3064.91 90.65 MWD 6500.00 88.72 15.86 4080.73 3129.73 43.96 6018184.29 551961.28 10.00 3089.82 90.60 MWD 6525.00 88.69 18.36 4081.30 3153.62 51.31 6018208.22 551968.47 10.00 3114.62 90.54 MWD 6550.00 88.67 20.86 4081.87 3177.16 59.70 6018231.82 551976.69 10.00 3139.26 90.48 MWD 6575.00 88.66 23.36 4082.46 3200.31 69.11 6018255.03 551985.93 10.00 3163.69 90.43 MWD 6600.00 88.64 25.86 4083.05 3223.03 79.52 6018277.82 551996.18 10.00 3187.87 90.37 MWD 6625.00 88.63 28.37 4083.64 3245.28 90.91 6018300.15 552007.42 10.00 3211.76 90.31 MWD 6650.00 88.62 30.87 4084.24 3267.00 103.26 6018321.96 552019.61 10.00 3235.30 90.25 MWD 6675.00 88.61 33.37 4084.84 3288.17 116.54 6018343.21 552032.75 10.00 3258.45 90.19 MWD 6700.00 88.61 35.87 4085.45 3308.73 130.74 6018363.87 552046.80 10.00 3281.17 90.13 MWD 6725.00 88.61 38.37 4086.06 3328.66 145.82 6018383.90 552061.74 10.00 3303.41 90.07 MWD 6750.00 88.61 40.87 4086.67 3347.91 161.76 6018403.26 552077.54 10.00 3325.14 90.01 MWD 6775.00 88.61 43.37 4087.27 3366.45 178.52 6018421.91 552094.17 10.00 3346.30 89.95 MWD 6800.00 88.62 45.87 4087.88 3384.24 196.07 6018439.82 552111.60 10.00 3366.87 89.89 MWD 6810.00 88.62 46.87 4088.14 3391.14 203.28 6018446.78 552118.76 9.99 3374.92 89.88 MWD 6825.00 88.62 45.37 4088.50 3401.53 214.09 6018457.24 552129.50 10.00 3387.03 270.00 MWD 6850.00 88.62 42.87 4089.10 3419.47 231.49 6018475.30 552146.77 10.00 3407.72 270.04 MWD 6875.00 88.63 40.37 4089.70 3438.16 248.08 6018494.10 552163.23 10.00 3429.00 270.10 MWD 6900.00 88.64 37.87 4090.30 3457.55 263.85 6018513.60 552178.86 10.00 3450.84 270.16 MWD 6925.00 88.65 35.37 4090.89 3477.61 278.76 6018533.76 552193.63 10.00 3473.18 270.22 MWD O BP Amoco bp Baker Hughes INTEQ Planning Report INTEQ Company: BP Amoco Date: 1/22/2001 Time: 14:39:36 Page: 4 Field: Milne Point Co-ordinate(NE) Reference: Well: MPJ-01, True North Site: M Pt J Pad Vertical (TVD) Reference: System: Mean Sea Level Well: MPJ-01 Section (VS) Reference: Well (0.00E,0.00N,10.00Azi) _Wel_!p..~.t_h~......p_!a_n_~..3_,_.~__P.J-01AL1 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD lncl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool '. ft deg deg ft ft ft ft ft deg/100ft ft deg 7025.00 88.72 25.36 4093.20 3563.75 329.23 6018620.25 552243.49 10.00 3566.78 270.45 MWD 7050.00 88.74 22.86 4093.75 3586.57 339.44 6018643.13 552253.54 10.00 3591.02 270.51 MWD 7075.00 88.77 20.36 4094.30 3609.80 348.65 6018666.42 552262.59 10.00 3615.50 270.56 MWD 7100.00 88.79 17.86 4094.83 3633.42 356.83 6018690.09 552270.60 10.00 3640.18 270.62 MWD 7125.00 88.82 15.36 4095.35 3657.36 363.98 6018714.09 552277.58 10.00 3665.00 270.67 MWD 7150.00 88.86 12.86 4095.86 3681.60 370.07 6018738.37 552283.51 10.00 3689.93 270.72 MWD 7175.00 88.89 10.36 4096.35 3706.08 375.10 6018762.88 552288.37 10.00 3714.92 270.77 MWD 7200.00 88.93 7.86 4096.82 3730.76 379.06 6018787.58 552292.15 10.00 3739.91 270.82 MWD 7225.00 88.97 5.36 4097.28 3755.59 381.94 6018812.43 552294.86 10.00 3764.86 270.87 MWD 7250.00 89.01 2.86 4097.73 3780.52 383.73 6018837.37 552296.47 10.00 3789.72 270.91 MWD 7275.00 89.05 0.36 4098.15 3805.50 384.43 6018862.35 552297.00 10.00 3814.45 270.96 MWD 7300.00 89.09 357.86 4098.55 3830.50 384.04 6018887.34 552296.44 10.00 3838.99 271.00 MWD 7325.00 89.14 355,36 4098.94 3855.45 382.57 6018912.28 552294.79 10.00 3863.31 271.04 MWD 7350.00 89.19 352.86 4099.30 3880.31 380.00 6018937.12 552292.05 10.00 3887.35 271.08 MWD 7375.00 89.24 350.36 4099.65 3905.04 376.36 6018961.82 552288.23 10.00 3911.07 271.12 MWD 7400.00 89.29 347.86 4099.97 3929.59 371.64 6018986.33 552283,34 10.00 3934.42 271.15 MWD 7410.00 89.31 346.86 4100.09 3939.35 369.42 6018996.08 552281.06 10.03 3943.65 271.18 MWD 7425.00 89.26 348.36 4100.28 3954.00 366.20 6019010.70 552277.74 10.00 3957.52 92.00 MWD 7450.00 89.17 350.86 4100.62 3978.58 361.69 6019035.25 552273.06 10.00 3980.95 91.98 MWD 7475.00 89.09 353.36 4101.00 4003.34 358.26 6019059.98 552269.46 10.00 4004.73 91.95 MWD 7500.00 89.01 355.86 4101.42 4028.23 355.91 6019084.85 552266.93 10.00 4028.83 91.91 MWD 7525.00 88.93 358.35 4101.87 4053.19 354.65 6019109.80 552265.50 10.00 4053.20 91.87 MWD 7550.00 88.85 0.85 4102.35 4078.18 354.48 6019134.79 552265.15 10.00 4077.78 91.82 MWD 7575.00 88.77 3.35 4102.87 4103.16 355.39 6019159.77 552265.89 10.00 4102.53 91.77 MWD 7600.00 88.70 5.85 4103.43 4128.07 357.40 6019184.69 552267.73 10.00 4127.42 91.72 MWD 7625.00 88.63 8.35 4104.01 4152.87 360.49 6019209.51 552270.64 10.00 4152.38 91.67 MWD 7650.00 88.56 10.85 4104.63 4177.51 364.66 6019234.17 552274.64 10.00 4177.37 91.61 MWD 7675.00 88.49 13.35 4105.27 4201.94 369.90 6019258.64 552279.71 10.00 4202.34 91.55 MWD 7700.00 88.43 15.85 4105.94 4226.12 376.20 6019282.86 552285.84 10.00 4227.25 91.48 MWD 7725.00 88.37 18.35 4106.64 4250.01 383.55 6019306.80 552293.02 10.00 4252.04 91.41 MWD 7750.00 88.31 20.85 4107.37 4273.55 391.93 6019330.39 552301.24 10.00 4276.68 91.34 MWD 7775.00 88.26 23.35 4108.12 4296.70 401.33 6019353.60 552310.48 10.00 4301.11 91.27 MWD 7800.00 88.21 25.85 4108.89 4319.41 411.74 6019376.39 552320.72 10.00 4325.29 91.20 MWD 7810.00 88.19 26.86 4109.21 4328.37 416.18 6019385.38 552325.10 10.05 4334.88 90.88 MWD 7825.00 88.19 25.36 4109.68 4341.83 422,78 6019398.88 552331.61 10.00 4349.28 270.00 MWD 7850.00 88.19 22.86 4110.47 4364.64 432.98 6019421.76 552341.65 10.00 4373.52 270.05 MWD 7875.00 88.20 20.36 4111.26 4387.87 442.18 6019445.05 552350.69 10.00 4397.99 270.13 MWD 7900.00 88.21 17.86 4112.04 4411.48 450.36 6019468.71 552358.70 10.00 4422.66 270.20 MWD 7925.00 88.23 15.35 4112.82 4435.42 457.50 6019492.70 552365.67 10.00 4447.48 270.28 MWD 7950.00 88.24 12.85 4113.59 4459.65 463.59 6019516.97 552371.59 10.00 4472.40 270.36 MWD 7975.00 88.26 10.35 4114.35 4484.13 468.62 6019541.48 552376.45 10.00 4497.38 270.44 MWD 8000.00 88.29 7.85 4115.10 4508.80 472.57 6019566.18 552380.23 10.00 4522.36 270.51 MWD 8025.00 88.32 5.35 4115.84 4533.62 475.44 6019591.02 552382.93 10.00 4547.31 270.59 MWD 8050.00 88.35 2.85 4116.57 4558.55 477.23 6019615.95 552384.54 10.00 4572.16 270.66 MWD 8075.00 88.38 0.35 4117.28 4583.53 477,93 6019640.93 552385.06 10.00 4596.88 270.74 MWD 8100.00 88.42 357.85 4117.98 4608.51 477.53 6019665.91 552384.50 10.00 4621.42 270.81 MWD 8125.00 88.46 355.35 4118.67 4633.46 476.05 6019690.84 552382.84 10.00 4645.73 270.88 MWD 8150.00 88.50 352.85 4119.33 4658.31 473.48 6019715.68 552380.10 10.00 4669.76 270.95 MWD 8175.00 88.55 350.35 4119.97 4683.03 469.83 6019740.37 552376.27 10.00 4693.47 271.01 MWD 8200.00 88.59 347.85 4120.60 4707.57 465.10 6019764.87 552371.37 10.00 4716.82 271.08 MWD 6950.00 88,66 32.87 4091.48 3498.30 292.77 6018554.54 552207.50 10,00 3495.99 270,28 MWD 6975.00 88.68 30.37 4092.06 3519.58 305.88 6018575.91 552220.45 10.00 3519.22 270.33 MWD 7000.00 88.70 27.86 4092.63 3541.41 318.04 6018597.83 552232.45 10.00 3542.84 270.39 MWD ,- BP Amoco bp Baker Hughes INTEQ Planning Report i~,~;i:'i~:~-6 .................... Company: BP Amoco Date: 1/22/2001 Time: 14:39:36 Page: 5 Field: Milne Point Co-ordinate(NE) Reference: Well: MPJ-01, True North Site: M Pt J Pad Vertical (TVD) Reference: System: Mean Sea Level Well: MPJ-01 Section (VS) Reference: Well (0.00E,0.00N,10.00Azi) Wellpath: Plan#3 MPJ-01AL1 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg 8225.00 88.64 345.35 4121.20 4731.88 459.31 6019789.14 552365.41 10.00 4739.75 271.14 MWD 8250.00 88.70 342.85 4121.78 4755.92 452.46 6019813.12 552358.40 10.00 4762.23 271.20 MWD 8275.00 88.75 340.35 4122.34 4779.63 444.57 6019836.78 552350.34 10.00 4784.22 271.26 MWD 8300.00 88.81 337.85 4122.87 4802.98 435.65 6019860.06 552341.26 10.00 4805.66 271.31 MWD 8320.00 88.86 335.84 4123.30 4821.37 427.74 6019878.40 552333.23 10.03 4822.40 271.33 MWD RECEIVED JAN 2 3 2001 Alaska Oil & Gas Cons. Commission Anchorage 3S CTD BOP Detail Methanol Injection - [~C ) 1 [ (~)~ I~CTInjectorHead I I I _~ ~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure tis 7" WLA Quick onnect -I 7-1/16" ID, 5000 psi working pressure Ram Type Dual Gate BOPE Manual over Hydraulic TOT Flanged Fire Resistant Kelly Hose to Dual Choke Manifold HCR Annular BOP (Hydril),7-1/16" ID 5000 psi working pressure I BlindlShear I 2 318" Combi Pipe/Slip Kill line check valve Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold 7-1/16" ID, 5000 psi working pressure Ram Type Dual Gate BOPE Manual over Hydraulic 2" Side outlets I2 718" Combi Pipe/Slip 2 318" Combi Pipe/Slip MOJ 12/29/00 XO Spool as necessary Single Manual Master Valve I1~~~\ , j 2 flanged gate valves 'IL. THA . I 7" Annulus Tubing ii- Spool 9 5/8" Annulus JAN 2 3 2001 Alaska Oil & Gas Cons. Commission Anchorage WELL PERMIT CHECKLIST COMPANY ,/~l:/- ..... WELL NAME.-/_4L)! g (.. [' PROGRAM: exp "dev ''/ redrll ' serv wellbore sag .__ FIELD & POOL 5-Z~---%'-"-,/ ~'~'(~ INIT CLASS '--~~" ~'~--~ // (-- GEOL AREA ~'~ UNIT# ~//~_.~ ~ ADMINISTRATION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. A~I~ DATE 12. ENGINEERING 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 27. ~ ' 28. 20. G E--'~6ES~T . 30. 31. 32. ~.~ DATE 33. o/ ann. disposal para req ~ Permit fee attached ....................... Lease number appropriate. Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from ddlling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available, in drilling unit ............ If deviated, is wellbore plat included ............... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can. be issued without administrative approval ...... Can permit be approved before 15-day wait ........... Conductor stdng provided ................... Surface casing protects all known USDWs ........... CMT vol adequate to circulate on conductor & surf csg ..... CMT vol adequate to tie-in long string to surf csg ........ CMT will cover all known productive horizons .......... Casing designs adequate for C, T, B & permafrost ....... ON/OFF SHORE Adequate tankage or reserve pit ................. If a re-drill, has a 10-403 for abandonment been approved... -Y---N- ~,~ Adequate wellbore separation proposed ............. If diverter required, does it meet regulations -Y---N Ddlling .fluid program schematic & equiP list adequate ..... BOPEs, do they meet regulation .......... ~ ..... (,,~N _ ~,. BOPE press rating appropriate; test to "~'-C:!L'~ Dsig. ~'~N ~.4J~,.~> ~_~,.~~ ,c,~.,. {I~{D~ r~-.~ ~ ' . Choke manifold complies w/APl RP,53 (May 8~)-. ....... (~N - " ~ ' Work will occur without operation shutdOwn ....... , . . . Is'presence of H2S gas probable................. Y ~,~ Permit can be issued wlo hydrogen sulfide measures ..... y("~ _'~ ,,J~ ~//~-¢,_//~ ,,~',: ~/~r-,:~/'u -c~_¢,7'~ ~ (,,.Jr'-/~' /?.~-~2;~/~"~ Da!a p. resented on potential overpressure zones ....... Y.~ Seismic analysis of shallow gas zones ............. j~ -Y' N " - ~ ~' ' Seabed condition survey (if off-shore) ...... ...... ...: ~ Y N ; ' ' Contact'name/phone for weekly progress reports [explor~3totY only] Y N ' . ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ....... Y N APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and . (E). will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N COMMISSION: ENGINEERING: UIC~nnular Comments/Instructions: J§ I§ c:\msoffice\wordian~iana\checklist (rev. 11/01//00) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well HistOry file and to simplify finding information, information, of this. nature is accumulated at the end of the file under APPE'NDIX~ No 'special'effort has been made to chronologically ., organize this category of information. **** REEL HE~DER **** M~D 01/07/04 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 01/07/03 125091 01 1.75" NaviGamma - Gamma Ray *** LIS COMMENT RECORD *** Remark File Version 1.000 Extract File: glen.las ~Version Information VERS. 1.20: WRAP. NO: ~Well Information Block SMNEM.UNIT Data Type STRT.FT 4666.0000: STO?.FT 7950.0000: STEP.FT 0.5000: NULL. -999.2500: COMP. COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API. API NYUMBER: CWLS log ASCII Standard -VERSION 1.20 One line per frame Information Starting Depth Ending Depth Level Spacing Absent Value BP Exploration, Inc. MPJ-01A-L1 Milne Point Unit 2622' NSL, 53378' WEL North Slope Alaska Baker Hughes INTEQ 1.75" NaviGamma - Gamma Ray 16-May-01 500292207060 ~Parameter Information Block SMNEM.UNIT Value # SECT. TOWN.N RANG. PDAT. EPD F LMF FAPD F DMF EKB F EDF F EGL F CASE.F OSl . ~Remarks Description 28 : Section Ti 3N : Township Ri 0E14E : Range N/A : Permanent Datum 0 : Elevation Of Perm. Datum RKB : Log Measured from 65.65 : Feet Above Perm. Datum KB : Drilling Measured From 65.65 : Elevation of Kelly Bushing N/A : Elevation of Derrick Floor N/A : Elevation of Ground Level N/A : Casing Depth DIRECTIONAL : Other Services Line 1 (1 Ail depths are Measured Depths (MD) unless otherwise noted. (2 All depths are Bit Depths unless otherwise noted. (3 All Gamma Ray data (GRAX) and Resistivity data (RACLX,RPCHX, RACHX,RPCLX) presented is realtime data. (4 Well MPJ-01A-L1 was drilled as a lateral sidetrack on well MPJ-01A from 4847' MD (3970' SSTVD) to TD @ 7950' MD (4099' SSTVD). (5) Baker Hughes INTEQ on Run $4 (lateral sidetrack) utilized the Orient Express with Ultra Slim Multiple Propagation Resistivity (USMPR) services from 4800' MD (4070' SSTVD) to 7921' MD (4099' SSTVD). (6) The interval from 4666' MD to 4846' MD was relogged at MWD Run %2. (7)The interval from 7921' MD (4099' SSTVD) to 7950' MD (4099' SSTVD) was not logged due to sensor to bit offset. (8) The data presented here is final.Gamma Ray MWD is considered Primary Depth Control. (9) A Magnetic Declination correction of 26.27 degrees has been applied to the Directional Surveys. (10) Srface Logging System/Software: CTMWD / DRILLBYTE. (11) Gamma Ray Detector: Scintillator. MNEMONICS: GRAX = Gamma Ray MWD-API [MWD] (MWD-API units) ROPS = Rate of Penetration, feet/hour TVD = Subsea True Vertical Depth (SSTVD), (feet) RACLX = Resistivity Compensated 400 kHz Attenuation Resistivity Borehole Corrected [MWD], (ohm-m) RPCLX = Resistivity Compensated 400 kHz Phase Difference Resistivity Borehole Corrected [MWD], (ohm-m) RACHX = Resistivity Compensated 2 MHz Attenuation Resistivity Borehole Corrected [MWD], (ohm-m) RPCHX = Resistivity Compensated 2 MHz Phase Difference Resistivity Borehole Corrected [MWD], (ohm-m) Tape Subfile: 1 Minimum record length: Maximum record length: 71 records... 14 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN mwd.xtf LCC 150 CN BP Exploration, Inc. WN MPJ-01A-L1 FN Milne Point Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented is the field raw data. 2. Gamma Ray MWD has been considered the Primary Depth Control(PDC). *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP 1 GR GRAX 0.0 2 ROP ROPS 0.0 3 RACH RACHX 0.0 4 RACL RACLX 0.0 5 RPCH RPCHX 0.0 6 RPCL RPCLX 0.0 * FORMAT RECORD (TYPE% 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size 1 GR MWD 68 1 API 4 2 ROP MWD 68 1 F/HR 4 3 RACH COMP 68 1 4 4 RACL COMP 68 1 4 5 RPCH COMP 68 1 4 6 RPCL COMP 68 1 4 Total Data Records: 183 Tape File Start Depth = 4666.000000 Tape File End Depth = 7950.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 Minimum record length: Maximum record length: 196 records... 54 bytes 4124 bytes **** TAPE TRAILER **** MWD 01/07/03 125091 01 Length 24 **** REEL TRAILER **** MWD 01/07/04 BHI 01 Tape Subfile: 3 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes Tape Subfile Tape Subfile DEPTH RPCH 4666.0000 -999.2500 4666.5000 -999.2500 4700.0000 -999.2500 4800.0000 -999.2500 4900.0000 15.9920 5000.0000 4.0870 5100.0000 3.3510 5200.0000 5.7110 5300.0000 5.9460 5400,0000 8.0620 5500.0000 17.6310 5600,0000 8.2150 5700.0000 12.2590 5800.0000 18.1810 5900.0000 17,7190 6000.0000 14.5850 6100.0000 13.1580 6200.0000 19.2350 6300.0000 14.7200 6400.0000 16.1570 6500.0000 15.8460 6600.0000 1 is type: LIS 2 is type: LIS GR RPCL 77.4620 -999.2500 73.8410 -999.2500 70.2940 -999.2500 62.3920 -999.2500 64.2650 15.3860 108.8360 4.4410 111.9600 3.4280 72.8550 5.8630 75.1200 6.5370 69.3400 9.1700 61.1410 16.7250 71.3240 10.3820 65.8270 12.7660 61.2200 18.5920 60,3610 17.8000 64.2270 14.7630 65.8270 13.3560 61.0630 17.8010 69.1070 15.1070 63.7970 15.4060 61.2980 16.0130 69.8480 ROP -999.2500 -999.2500 -999.2500 -999.2500 124.1840 119.8940 156.7830 240.0020 105.6320 36.2690 106.8870 124.1090 129.2000 156.7830 79.1840 147.0250 181.0120 143.4760 196.0340 74.0220 168.4290 162.8040 RACH -999.2500 -999.2500 -999.2500 -999.2500 15.4520 4. 6750 3.4970 6.2260 7.0940 10.1450 16.0290 13.5530 13.8270 20.5060 18.9460 14.9300 13.2650 17.1650 16.4220 15.0750 16.4700 12.4930 RACL -999.2500 -999.2500 -999.2500 -999.2500 13.1800 5.5870 3.8990 5.9840 7.5190 10.6930 13.7870 13.9010 12.6720 16.1940 15.0770 14.0090 13.0640 13.7010 13.9510 13.1410 14.0880 11.7570 10.4600 11.5610 6700.0000 74.1820 12.8290 12.6650 6800.0000 65.2420 14.0710 13.3070 6900.0000 57.3540 13.9920 13.6440 7000.0000 77.0980 14.2350 13.4220 7100.0000 60.4390 14.7930 14.7340 7200.0000 62.0010 15.8270 15.4640 7300.0000 66.9210 14.2900 14.6900 7400.0000 62.0010 16.1760 14.6900 7500.0000 64.3430 11.1220 12.1410 7600.0000 66.1400 10.2340 10.9430 7700.0000 59.4240 12.1690 12.0050 7800.0000 69.2640 9.8060 10.8070 7900.0000 68.5740 -999.2500 -999.2500 7950.0000 -999.2500 -999.2500 -999.2500 178.2800 166.3520 157.0740 100 9480 147 0250 136 1090 166 3520 172 3640 148 2570 28 8470 44 2220 296.5110 209.0450 -999.2500 Tape File Start Depth = 4666.000000 Tape File End Depth = 7950.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 3 is type: LIS 12.1550 12.7130 13.1420 13.2800 15.7720 15.7080 15.6400 13.9340 13.8820 11.6980 11.6410 11.4540 -999.2500 -999.2500 11. 1920 11.7260 12 3460 11 8040 13 0920 13 0200 13 0040 11.7550 12.0140 10.9100 10.5340 10.9400 -999.2500 -999.2500