Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
195-142
XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /¢5"/¢~ File Number of Well History File PAGES TO DELETE Complete RESCAN GCr °i°r pictures, graphs, charts - iyscale, halftones, items Pages: Pages:~J [] Poor Quality Original - Pages: [] Other- Pages' DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: scanned by: Bevedy Dian~than Lowell Is/ [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lo41i '~t"~::. -% Is~ P LUGG iNC.' & L0~AT!0N C L EA_~A_NCE REPORT Sta~a cf Alaska ALASKX 0iL & GA~ CTNS~i~V~TION CCHMISSION Wei! Name Liner: Review ~he well file, and-¢=~-~: on plug~g, well head suaUus, ~ !ocaUi:n c!e~ce-- ur~i~ ! Well ~,a~ mac o~f: ~ ~ '~ ~ker pose cr place: ~'~ - Locaclcn Clef=ca: , ,c. ,clear. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back For Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 195-142 302-053 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22597-00 4. Location of well at surface 9. Unit or Lease Name ,,!-- '~~.~. Milne Point Unit 2709' NSL, 4079' WEL, SEC. 34, T13N, R10E, UM At top of productive interval 3631' SNL, 3218' WEL, SEC. 02, T12N, R10E, UM ~ ~, ~.. 10. Well Number At total depth ¢ ....... .~' ...... -'~-': MPH-07 4731' SNL, 2392' WEL, SEC. 11, T12N, R10E, UM 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit / Schrader Bluff KBE = 66.00' ADL 380109 17. Total15900 Depth (MD+TVD)I 18'7108 FT Plug8950Back Depth (MD+TVD)4265 FT1119' Directi°nal SurveY I 20'[] Yes [] No Depth where SSSV setl 21' Thickness °f Permafr°stN/A MDI 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, CDN, CDR, GR/CCL 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP DO'FI'OM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# H-40 32' 112' 24" 250 SX Arcticset I (Approx.) 9-5/8" 40# L-80 31' 9217' 12-1/4" 1484 SX PF 'E', 747 SX Class 'G', 50 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 2-7/8", 6.5#, L-80 8141' N/A MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 8165' Set Cement Retainer 8165' P&A with 25 Bbls Class 'G', Below Retainer 8165' Set Whipstock on top of Retainer 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not On Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER'BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS'MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HouR RATE 28. CORE DATA ~"-'~- ~:'~ .¢"'; ~'" t~ ', ~ r,~ ;,:~,.~ . Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas~or ~a[er. ::,Sub~'~t ;.core~ch~ps. No core samples were taken. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. (Subsea) SBF1 8195' 3998' SBE4 8316' 4029' SBE3 8348' 4037' TSBD 8631' 4109' TSBB 8877' 4178' SBA5 8966' 4204' !.,' 'i . ; '7 i !~ · , . . ..: r :~. U :.' (., 31. List of A~achments: Summa~ of Abandonment Daily Drilling Repods 32. [ hereby cedi~ that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble ~~ ~ Title TechnicalAssistant Date MPH-07 195-142 302-053 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Permit No./Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Legal Well Name: MPH-07 Common Well Name: MPH-07 Spud Date: 3/4/2002 Event Name: PLUG+ABANDON Start: 2/20/2002 End: 3/1/2002 Contractor Name: Rig Release: Rig Name: Rig Number: ~::~ ~dat~ ~From - To ~oUrs~ ACtivi~ :Cbd~ ~NP~I::: Phase ~l Description of Operations 2/24/2002 18:00 - 00:00 6.00 MOB P PRE MOVE RIG FROM MPF-33 & MI/MU ON MPH-07 & SAFE OUT EQUIPMENT. (RIG ACCEPT @ 00:01 HRS. 02/25/2002) 2/25/2002 00:00 - 04:00 4.00 RIGU DECOMP ACCEPT RIG AT 00:00 HRS. RIG UP HCR VALVE. HOOK UP LINES AND VALVES TO TREE AND TIGER TANK. 04:00 - 05:00 1.00 RIGU DECOMP TAKE ON HOT SEA WATER IN RIG PITS. PRESS TEST LINES TO 3,500 PSI. 05:00 - 06:00 1.00 KILL DECOMP PJSM. BLEED GAS. BEGIN WELL KILL OPERATIONS. CREW CHANGE. 06:00 - 09:30 3.50 KILL DECOMP FINISH WELL KILL OPERATIONS. MONITOR WELL. 09:30 - 10:00 0.50 WHSUR i DECOMP SET TWC. TEST. 10:00 - 11:00 1.00 WHSUR DECOMP REMOVE PRODUCTION TREE. 11:00 - 13:00 2.00 BOPSUF DECOMP INSTALL BOPE. 13:00 - 16:00 3.00 BOPSUF DECOMP PERFORM BOPE TESTAS PER BP/AOGCC REQUIREMENTS. RIGHT TO WITNESS TEST WAIVED BY STATE...J.JONES. 16:00 - 17:00 1.00 WHSUR DECOMP PICK-UP LUBRICATOR. PULLTWC. LD DOWN LUBRICATOR. 17:00 - 17:30 0.50 PULL DECOMP PU LANDING JT. PULL HANGER TO FLOOR. LD LANDING JT. 17:30 - 18:00 0.50 PULL DECOMP RIG UP DOUBLE SHEAVE FOR ESP AND HEAT TRACE CABLES. CREW CHANGE. 18:00 -20:00 2.00 PULL DECOMP FINISH RIGGING UP SPOOLING UNIT AND HANDLING EQUIPMENT. 20:00 - 00:00 4.00 PULL DECOMP START POOH WITH 2 7/8" TBG. SPOOLING ESP CABLE AND HEAT TRACE CABLE. CREW CHANGE. 2/26/2002 00:00 - 06:00 6.00 PULL ~ DECOMP FINISH POOH WITH 2 7/8" TBG AND ESP ASSY. 06:00 - 07:30 1.50 PULL ~ DECOMP LAY DOWN "Y" TOOL AND ESP ASSY. 07:30 - 09:00 1.50 PULL P DECOMP RIG DOWN DOUBLE SHEAVE AND REMAINDER OF THE ESP HANDLING EQUIPMENT. 09:00 - 10:00 1.00 PULL P DECOMP CLEAR AND CLEAN FLOOR. 10:00 - 10:30 0.50 PXA P ABAN PICK UP 9 5/8" CSG SCRAPER ASSY. 10:30 - 15:30 5.00 PXA P ABAN START RUNNING CSG SCRAPER. PICKING UP 3 1/2" DRILL PIPE FROM PIPE SHED. STARTING TO STACK OUT AT 5,675-FT. 15:30 - 16:30 1.00 PXA N DPRB ABAN CONTINUE IN HOLE. WASH AND WORK DOWN TO 5,850-FT. 16:30 - 18:00 1.5C ~XA N DPRB ABAN CONTINUE IN HOLE. CREW CHANGE. 18:00 - 00:00 6.00 =XA N DPRB ABAN CONTINUE WASHING EACH JT DOWN. NOW AT 7,598-FT .... RECOVERING "N" SAND AND SILT IN SAMPLES. 2/27/2002 00:00 - 05:00 5.00 PXA N DPRB ABAN CONTINUE TO WORK AND WASH DOWN TO 8,030-FT. 05:00 - 06:00 1.00 PXA N DPRB ABAN STOP TO REVERSE CIRCULATE. CREW CHANGE. 06:00 - 09:30 3.50 PXA N DPRB ABAN CONTINUE TO WORK AND WASH DOWN TO TOP OF RE-ENTRY GUIDE AT 8,551-FT DRILLER'S DEPTH. 09:30 - 11:00 1.50 PXA N DPRB ABAN REVERSE CIRCULATE AT 6 BPM. 11:00 - 12:00 1.00 PXA N DPRB ABAN SHORT TRIP UP TO 5,850-FT. HAD SEVERAL OVER PULL AREAS. 12:00 - 14:00 2.00 PXA N DPRB ABAN TRIP BACK TO BOTTOM. WORK AND WASH AS NEEDED. 14:00- 17:00 3.00 PXA N DPRB ABAN REVERSE CIRCULATE. 17:00 - 18:00 1.00 PXA ~ ABAN START TOH. CREW CHANGE. 18:00 - 20:30 2.50 PXA P ABAN CONTINUE TOH. STAND BACK 40 STDS. 20:30 - 22:00 1.50 PXA P ABAN STOP TO CUT AND SLIP DRILLING. 22:00 - 23:30 1.50 PXA P ABAN FINISH TOH WITH 3 1/2" DRILL PIPE AND BHA. 23:30 - 00:00 0.50 PXA P ABAN LD CSG SCRAPER. Printed: 4/1/2002 11:13:13AM i ns summary Report Legal Well Name: MPH-07 Common Well Name: MPH-07 Spud Date: 3/4/2002 Event Name: PLUG+ABANDON Start: 2/20/2002 End: 3/1/2002 Contractor Name: Rig Release: Rig Name: Rig Number: ~Date ~ ~Hours 'Activity C~ ~NpT: l phase Description of Operations 2/28/2002 00:00 - 01:00 1.00 PXA P ABAN PJSM. PICK-UP SE'I-rING TOOL AND CEMENT RETAINER. 01:00 - 03:30 2.501 PXA P ABAN TIH WITH RETAINER AND DRILL PIPE. 03:30 - 04:30 1.00 PXA P ABAN SET RETAINER AT 8,165-FT 04:30 - 06:00 1.50 PXA P ABAN STING BACK INTO RETAINER. A'I-FEMPT TO ESTABLISH INJECTION RATE. NO LUCK. 06:00 - 08:30 2.50 PXA N DPRB ABAN TOH WITH DRILL PIPE AND STINGER. 08:30 - 11:30 3.00 PXA N DPRB ABAN CHANGE OUT STINGER. TIH WITH DRILL PIPE. 11:30 - 12:00 0.50 PXA P ABAN STING INTO RETAINER AND ESTABLISH INJECTION INTO FORMATION. 12:00 - 13:30 1.50 PXA P ABAN STAGE CEMENT AND PUMP 25 BBLS CLASS "G" BELOW RETAINER. AVERAGE RATE 3 BPM/1,675 PSI. 13:30 - 14:30 1.00 PXA P ABAN REVERSE CIRCULATE UNTIL RETURNS ARE CLEAN. 14:30 - 15:00 0.50 PXA P ABAN PRESSURE TEST CMT RETAINER @ 2,500 PSI/30 MIN. GOOD TEST. 15:00 - 18:00 3.00 PXA P ABAN START TOH. LAY DOWN DRILL PIPE. CREW CHANGE. 18:00 - 19:00 1.00 PXA P ABAN CONTINUE TO TOH WITH DRILL PIPE. 19:00 - 20:30 1.50 PXA P ABAN STOP TO FREEZE PROTECT. 20:30 - 23:00 2.50 PXA P ABAN FINISH LAY DOWN DRILL PIPE AND STINGER/SETTING TOOL. 23:00 - 23:30 0.50 PXA P ABAN PICK UP LANDING JT. LAND HANGER. RILDS. 23:30 - 00:00 0.50 PXA P ABAN INSTALL TWC. PRESSURE TEST. 3/1/2002 00:00 - 0.00 PXA ABAN 3/2/2002 00:00 - 02:30 2.50 BOPSUF P ABAN SET TWC & NIPPLE DOWN BOP 02:30 - 05:00 2.50 WHSUR ~ ABAN NIPPLE UP TREE & TEST TO 5000 PSI. 05:00 - 06:00 1.00 RIGD ~ ABAN SECURE TREE & CELLAR AREA & CLN-PITS. RIG RELEASED @ 0600 HRS. 3/1/2002 Prinled: 4/1/2002 11:13:13 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 Location of well at surface 2709' NSL, 4079' WEL, SEC. 34, T13N, R10E, UM At top of productive interval 3631' SNL, 3218' WEL, SEC. 02, T12N, R10E, UM At effective depth 3933' SNL, 3175' WEL, SEC. 02, T12N, R10E, UM At total depth 4731' SNL, 2392' WEL, SEC. 11, T12N, R10E, UM 6. Datum Elevation (DF or KB) KBE -- 66.00' 7. Unit or Property Name Milne Point Unit 8. Well Number MPH-07 9. Permit Number 10. APl Number 50- 029-22597-00 v/' 11. Field and Pool Milne Point Unit / Schrader Bluff 12. Present well condition summary Total depth: measured Effective depth: Casing Structural true vertical measured true vertical Conductor Surface Intermediate Production Liner 15900 feet 7108 feet 8950 feet 4265 feet Length Size 80' 20" 9186' 9-5/8" Plugs (measured) Junk (measured) Isolation Plug & Shear Disc at 8362'; HES 9-5/8" EZSV retainers at 9065' and 9070' Cemented MD 250 sx Arcticset I (Approx.) 112' 1484 sx PF 'E', 747 sx 'G', 50 sx 'G' 9217' TVD 112' 4343' RECEIVED Perforation depth: measured true vertical 8215'-8235', 8328'-8349', 8674'-8695', 8906'-8927' 4069'-4074', 4098'-4103', 4187'-4193', 4252'-4258' FEB 0 ^1~ 0il & 6~ Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 with tailpipe assembly at 7783' Packers and SSSV (type and measured depth) Frac pac assembly packers at 8373', 8720' and 8942' 13. Attachments [] Description Summary of Proposal 14. Estimated date for commencing operation February 15, 2002 16. If proposal was verbally approved Name of approver Date Approved Contact Engineer Name/Number: Paul Chan, 564-5254 [] Detailed Operations Program [] BOP Sketch Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By Name/Number: Sondra Stewman, 564-4750 17. I hereby certify that the f,oregoir~ is true and correcbto the best of my knowledge Signed ~/--/' .... · , ~ '-~- ~:~¥ ~S"~ Title Drilling Engineer PaulChan ,~ ~ ~~ ~1~,~ : :-: : :: :~ ::.:~:~ :~6om~i~ionuseonly:. Conditions of Approval: Noti~ Commission so representative may, witne~ ~ ~ ~ Plug integri~ BOP Test ~ Lo~on~learance Mechanical Integrity Test __ Approved by order of the Commission Form 10-403 Rev. 06/15/88 Subsequent form required 10- · Original $~ned By b~lllllll¥ U._~ fl~JJ Date I Approval No..::.2~-.~-0 %-~'~) Commissioner Submit In 'f'rilJlicate H-07 Plug and Abandon Schrader Bluff Gravel Pack , 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. MIRU N4ES. ND Tree/NU BOPE. Retrieve ESPCP and heat trace. RIH with scraper to 8200' MD. RIH with cement retainer on 2-7/8" tubing. Set retainer at 8165' MD. Pump 25 bbls of 15.9 ppg Class G cement (1.15 cuft/sk). Unsting from cement retainer and test to 2500 psi. Freeze protect well. MU tubing hanger and land tubing. ND BOPE/NU Tree. RDMO N4ES. THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03, 2001 M PL E W ATE IA L UNDER TH IS M ARK ER C:LOR_n~viFmM.DOC AOGCC Individual Well Geological Materials Inventory PERMIT DATA T DATA PLUS ......... 95-142 6822 ~050-10884 PDK-100/~R 95-142 GR/CCL JSEPIA 20-8971 95-142 7387 ,~R/CCL MARKED LINE 95-142 CDR-MD ~/4910-15870 95-142 CDR-TVD ~'~250-7080 95-142 CDN-MD ~/I~ 9150-15920 95-142 CDN-TVD ~4320-7120 95-142 7451 L,q~'~DR/CDN 4904-15920 95-142 GR-CCL CORRELATEX6740-8324 95-142 GR/CCL ~-~L/ 7250-7717 95-142 SRVY CALC R/SCHLUM 112.-15898. 95-142 MULTI SHOT ~E~SPERRY 0-9249 10-407 DAILY WELL OPS Page: 1 Date: 01/21/99 RUN RECVD 1 09/14/95 1 07/12/96 1 08/16/96 FINAL 09/05/96 FINAL 09/05/96 FINAL 09/05/96 FINAL 09/05/96 1-3 09/05/96 FINAL 02/21/97 FIANL 07/03/97 07/25/97 07/25/97 Are dry ditch samples required? yes ~=And received? Was the well cored? yes r~-Analysis & description received? Are well tests required? yes ~._~Received? Well is in compliance Initial COMMENTS STATE OF ALASKA ALASKA U~L AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown I--'1 Stimulate [] Plugging [] Perforate [] Pull Tubing I--]Alter Casing [] Repair Well [] Other ESP Changeout 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2709' NSL, 4079' WEL, SEC. 34, T13N, R10E, UM At top of productive interval 3631' SNL, 3214' WEL, SEC. 2, T12N, R10E, UM At effective depth 3933' SNL, 3171' WEL, SEC 2, T12N, R10E, UM At total depth 4731' SNL, 2380' WEL, SEC. 11, T12N, R10E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 65.05' 7. Unit or Property Name Maine Point Unit 8. Well Number MPH-07 9. Permit Number / Approval No. 95-142 10. APl Number 50- 029-22597 11. Field and Pool Maine Point Unit / Schrader Bluff 12. Present well condition summary Total depth: measured 15900 feet true vertical 7108 feet Effective depth: measured 8950 feet true vertical 4265 feet Casing Length Structural Conductor Surface Intermediate Production Liner Plugs (measured) Junk (measured) HES Broken Glass Disc at 8358'; Hes 9-5/8" EZSV retainers at 9065' & 9070' Size Cemented MD TVD 80' 20" 9186' 9-5/8" 250 sx Arcticset I (Approx.) 1484 sx PF 'E', 747 sx 'G', 50 sx 'G' 112' 112' 9217' 4343' Perforation depth: measured true vertical 8215'-8235', 8328'-8349', 8674'-8695', 8906'-8927' (Subsea) 4069' - 4074', 4098' - 4103', 4187' - 4193', 4252' - 4258' Tubing (size, grade, and measured depth) 2-7/8" 6.5~ L-80 with tailpipe assembly at 6900' Packers and SSSV (type and measured depth) Frac pac assembly packers at 8373',8720' and 8942' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments F-] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 17. I hereby certify that the foregoing is true and correctto the best of my knowledge SignedJeanne L. Haas~ ~'~'~~: ~'. ~¢/~"-~-"¢~'-Title Staff Technical Assistant Prepared By Name/Number: Date Jeanne L. H~as, 5~64-5225 Progress Report Facility M Pt H Pad Well MPH-07 Rig Nabors 5S Page 1 Date 11 May 98 Date/Time 18 Apr 98 06:00-06:15 06:15-13:30 13:30-14:00 14:00-16:30 16:30-18:00 18:00-18:15 18:15-19:00 19:00-22:00 22:00-00:00 19 Apr 98 00:00-00:30 00:30-01:30 01:30-02:30 02:30-03:30 03:30-06:00 06:00-06:15 06:15-07:30 07:30-08:30 08:30-09:30 09:30-11:00 11:00-21:00 21:00-22:30 22:30-02:00 20 Apr 98 02:00-06:00 06:00-06:15 06:15-09:00 09:00-10:00 10:00-12:00 12:00-23:30 23:30-05:30 21 Apr 98 05:30-06:00 06:00-06:30 06:30-07:30 07:30-11:30 11:30-12:30 12:30-18:00 18:00-18:30 18:30-21:00 21:00-22:00 22:00-23:00 23:00-01:00 22 Apr 98 01:00-05:30 05:30-06:00 06:00-10:00 10:00-10:30 10:30-11:00 11:00-12:00 12:00-12:30 12:30-13:00 13:00-13:30 13:30-19:00 19:00-20:30 20:30-00:30 23 Apr 98 00:30-06:00 06:00-06:15 Duration 1/4 hr 7-1/4 hr 1/2 hr 2-1/2 hr 1-1/2 hr 1/4 hr 3/4 hr 3hr 2hr 1/2 hr lhr lhr lhr 2-1/2 hr 1/4 hr 1-1/4 hr lhr lhr 1-1/2 hr 10hr 1-1/2 hr 3-1/2 hr 4hr 1/4 hr 2-3/4 hr lhr 2hr 11-1/2 hr 6hr 1/2 hr 1/2 hr lhr 4hr lhr 5-1/2 hr 1/2 hr 2-1/2 hr lhr lhr 2hr 4-1/2 hr 1/2 hr 4hr 1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 5-1/2 hr 1-1/2 hr 4hr 5-1/2 hr 1/4 hr Activity Held safety meeting Rig moved 100.00 % Held safety meeting Bleed down well Bleed down well Held safety meeting Bleed down well Circulated closed in well at 7750.0 ft Monitor wellbore pressures Monitor wellbore pressures Circulated closed in well at 7750.0 ft Installed Hanger plug Installed BOP stack Tested All rams Held safety meeting Tested BOP stack Removed Lubricator Pulled Tubing on retrieval string to 7725.0 ft Tested ESP Pulled Tubing in stands to 100.0 ft Rigged down sub-surface equipment - ESP Ran Tubing in stands to 4350.0 ft Reverse circulated at 7760.0 ft Held safety meeting Ran Tubing to 7870.0 ft (2-7/8in OD) Reverse circulated at 7870.0 ft Installed Swivel Washed to 8358.0 ft Circulated at 8358.0 ft Rigged down Swivel Rigged down Swivel Circulated at 8358.0 ft Pulled Tubing in stands to 2.9 ft Rigged down Tubing handling equipment R.I.H. to 4336.0 ft Held safety meeting R.I.H. to 8293.0 ft Washed to 8358.0 ft Reverse circulated at 8358.0 ft Reverse circulated at 8669.0 ft Drilled to 8982.0 ft Reverse circulated at 8982.0 ft Circulated at 8991.0 ft Rigged down Swivel Serviced Rig services Pulled out of hole to 7470.0 ft Circulated at 7470.0 ft Pulled out of hole to 6270.0 ft Removed Tubing handling equipment Pulled out of hole to 0.0 ft Installed ESP Installed ESP Installed ESP Held safety meeting Facility M Pt H Pad Progress Report Well MPH-07 Rig Nabors 5S Page Date 2 11 May 98 Date/Time 24 Apr 98 06:15-18:00 18:00-18:15 18:15-01:00 01:00-05:00 05:00-06:00 06:00-06:15 06:15-08:15 08:15-10:00 Duration 11-3/4 hr 1/4 hr 6-3/4 hr 4hr lhr 1/4 hr 2hr 1-3/4 hr Activity Ran Tubing in stands to 5250.0 ft Held safety meeting Ran Tubing in stands to 6900.0 ft Ran Tubing on landing string to 6900.0 ft Removed BOP stack Held safety meeting Installed Xmas tree Displace treatment ,. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [--] Operation Shutdown I--I Stimulate [~] Pull Tubing [-] Alter Casing 1 5. 99519-6612 I I 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 4. Location of well at surface 2709' NSL, 4079' WEL, SEC. 34, T13N, R10E, UM At top of productive interval 3631' SNL, 3214' WEL, SEC. 2, T12N, R10E, UM At effective depth 3933' SNL, 3171' WEL, SEC. 2, T12N, R10E, UM At total depth 4731' SNL, 2380' WEL, SEC. 11, T12N, R10E, UM [--I Plugging I-~ PeRorate [--] Repair Well [~Other ESP Installation Type of well: [~ Development I--] Exploratory I--I Stratigraphic [-I Service 6. Datum Elevation (DF or KB) KBE = 65.05' 7. Unit or Property Name Milne Point Unit 8. Well Number MPH-07 9. Permit Number / Approval No. 95-142 10. APl Number 50-029-22597 11. Field and Pool Milne Point Unit / Schrader Bluff 12. Present well condition summary Total depth: measured 15900 feet true vertical 7108 feet Effective depth: measured 8950 feet true vertical 4265 feet Casing Length Size Structural Conductor 80' 20" Surface 9186' 9-5/8" Intermediate Production Liner Plugs (measured) Junk (measured) HES Broken Glass Disc at 8358'; HES 9-5/8" EZSV retainers at 9065' & 9070' Cemented MD TVD 250 sx Arcticset I (Approx.) 112' 1484 sx PF 'E', 747 sx 'G', 50 sx 'G' 9217' 112' 4343' PeRoration depth: measured true vertical 8215'-8235',8328'-8349',8674'-8695',8906'-8927' 4069'-4074',4098'-4103',4187'-4193',4252'-4258' Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 with tailpipe assembly at 7750' Packers and SSSV (type and measured depth) Frac pac assembly packers at 8373',8720' and 8942' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 0Ri61NAL 14. Prior to well operation: Subsequent to operation: Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [--I Copies of Logs and Surveys run [] Daily Repor[ of Well Operations 16. Status of well classifications as: [~ Oil i--] Gas r-'] Suspended Service 17. I hereby certify that the foregoing is true ~e best of my knowledge Signed d~ ~' Title Staff Technical Assistant Jeanne L. Haas, 564-5225 Prepared By Name/NumbeF. '~ Facility M Pt H Pad Progress Report Well MPH-07 Page 1 Rig Nabors 5S Date 25 February 98 Date/Time 17 Jan 98 18 Jan 98 19 Jan 98 20 Jan 98 21 Jan 98 22 Jan 98 23 Jan 98 06:00-12:00 12:00-15:00 15:00-18:00 18:00-19:00 19:00-22:30 22:30-03:00 03:00-05:30 05:30-06:00 06:00-07:30 07:30-13:30 13:30-14:30 14:30-16:00 16:00-18:00 18:00-22:00 22:00-00:30 00:30-01:30 01:30-03:30 03:30-06:00 06:00-10:30 10:30-18:00 18:00-20:00 20:00-02:30 02:30-03:00 03:00-06:00 06:00-11:00 11:00-15:30 15:30-18:00 18:00-21:00 21:00-00:30 00:30-05:00 05:00-06:00 06:00-06:30 06:30-10:30 10:30-11:30 11:30-18:00 18:00-18:30 18:30-21:30 21:30-23:30 23:30-00:30 00:30-03:30 03:30-06:00 06:00-10:00 10:00-11:30 11:30-18:00 18:00-18:30 18:30-20:00 20:00-02:30 02:30-04:00 04:00-04:30 04:30-06:00 06:00-06:30 06:30-10:00 10:00-16:00 16:00-18:00 Duration 6hr 3hr 3hr lhr 3-1/2 hr 4-1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr 6hr lhr 1-1/2 hr 2hr 4hr 2-1/2 hr lhr 2hr 2-1/2 hr 4-1/2 hr 7-1/2 hr 2hr 6-1/2 hr 1/2hr 3hr 5hr 4-1/2 hr 2-1/2 hr 3hr 3-1/2 hr 4-1/2 hr lhr 1/2 hr 4hr lhr 6-1/2 hr 1/2 hr 3hr 2hr lhr 3hr 2-1/2 hr 4hr 1-1/2 hr 6-1/2 hr 1/2 hr 1-1/2 hr 6-1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr 6hr 2hr Activity Rig moved 100.00 % Rig moved 100.00 % Bleed down well Bleed down well Bleed down well Circulated at 3181.0 ft Monitor wellbore pressures Removed Xmas tree Monitor wellbore pressures Removed Xmas tree Removed Xmas tree Worked on BOP - All rams Tested All rams Tested All rams Removed Accessories Retrieved Tubing hanger Pulled Tubing in stands to 0.0 ft Pulled Tubing in stands to 1200.0 ft Monitor pressures Conducted slickline operations on Slickline equipment - Tool run Conducted slickline operations on Slickline equipment - Tool run Conducted slickline operations on Slickline equipment - Tool run Monitor wellbore pressures Pulled Tubing in stands to 2300.0 ft Pulled Tubing in stands to 2400.0 ft Conducted slickline operations on Slickline equipment - Tool run Pulled Tubing in stands to 1000.0 ft Pulled Tubing in stands to 0.0 ft Pulled Tubing in stands to 0.0 ft Ran Tubing in stands to 7700.0 ft Circulated at 7700.0 ft Held safety meeting Circulated at 7700.0 ft Ran Tubing to 8210.0 ft (2-7/8in OD) Rig waited · Materials Held safety meeting Rig waited · Materials Fill pits with Seawater Circulated at 8210.0 ft Fill pits with Seawater Reverse circulated at 8230.0 ft Reverse circulated at 8244.0 ft Reverse circulated at 8244.0 ft Pulled Tubing in stands to 1500.0 ft Held safety meeting Pulled Tubing in stands to 0.0 ft Ran Tubing in stands to 8219.0 ft Washed to 8227.0 ft Reverse circulated at 8227.0 ft Rigged up Swivel Held safety meeting Washed to 8236.0 ft Reverse circulated at 8358.0 ft Rigged down Swivel Facility Date/Time 24 Jan 98 25 Jan 98 26 Jan 98 27 Jan 98 M Pt H Pad Progress Report Well MPH-07 Rig Nabors 5S Page Date Duration Activity 18:00-23:30 23:30-04:00 04:00-05:00 05:00-06:00 06:00-07:30 07:30-09:00 09:00-09:30 09:30-20:00 20:00-21:30 21:30-04:00 04:00-05:00 05:00-06:00 06:00-09:30 09:30-17:00 17:00-06:00 06:00-13:30 13:30-15:00 15:00-18:00 18:00-19:00 19:00-21:00 21:00-01:00 01:00-03:30 03:30-04:30 04:30-06:00 5-1/2 hr 4-1/2 hr lhr lhr 1-1/2 hr 1-1/2 hr 1/2 hr 10-1/2 hr 1-1/2 hr 6-1/2 hr lhr lhr 3-1/2 hr 7-1/2 hr 13hr 7-1/2 hr 1-1/2 hr 3hr lhr 2hr 4hr 2-1/2 hr lhr 1-1/2 hr Pulled Tubing in stands to 0.0 ft Ran Tubing in stands to 8334.0 ft Washed to 8367.0 ft Washed to 8367.0 ft Washed to 8369.0 ft Rigged up Swivel Washed to 8385.0 ft Reverse circulated at 8358.0 ft Rigged down Swivel Pulled Tubing in stands to 0.0 ft Removed Wear bushing Serviced Block line Serviced Block line Installed Electrical submersible pumps Ran Tubing in stands to 6000.0 ft Ran Tubing in stands to 7731.0 ft Space out tubulars Rigged up sub-surface equipment - Cable head Installed Tubing hanger Removed BOP stack Installed Xmas tree Displace treatment Installed Hanger plug Cleared Standpipe manifold 2 25 February 98 ~' STATE OF ALASKA ~- ALASKA ...,L AND GAS CONSERVATION COIv, MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: I--IOperation Shutdown []Stimulate [] Pull Tubing [-]Alter Casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2709' NSL, 4079' WEL, SEC. 34, T13N, R10E, UM At top of productive interval 3631' SNL, 3214' WEL, SEC. 2, T12N, R10E, UM At effective depth 3933' SNL, 3171' WEL, SEC. 2, T12N, R10E, UM At total depth 4731' SNL, 2380' WEL, SEC. 11, T12N, R10E, UM [] Plugging [~ Perforate [] Repair Well [~ Other ESP Installation 5. Type of well: [] Development J--] Exploratory [] Stratigraphic E] Service 6. Datum Elevation (DF or KB) KBE = 65.05' 7. Unit or Property Name Milne Point Unit 8. Well Number MPH-07 9. Permit Number / Approval No. 95-142 10. APl Number 50-029-22597 11. Field and Pool Milne Point Unit/Schrader Bluff 12. Present well condition summary Total depth: measured 15900 feet true vertical 7108 feet Effective depth: measured 8950 feet true vertical 4265 feet Casing Length Structural Conductor Surface Intermediate Production Liner Size 80' 20" 9186' 9-5/8" Plugs (measured) Junk (measured) Isolation Plug & Shear Disc at 8362'; HES 9-5/8" EZSV retainers at 9065' and 9070' Cemented MD TVD 250 sx Arcticset I (Approx.) 112' 1484 sx PF 'E', 747 sx 'G', 50 sx 'G' 9217' 112' 4343' Perforation depth: measured 8215'-8235',8328'-8349',8674'-8695',8906'-8927' true vertical 4069'-4074',4098'-4103',4187'-4193',4252'-4258' Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 with tailpipe assembly at 7783' Packers and SSSV (type and measured depth) Frac pac assembly packers at 8373', 8720' and 8942' 13. Stimulation or cement squeeze summary Frac with HES Prop Lok Intervals treated (measured) 8215'-8235', 8329'-8349' Treatment description including volumes used and final pressure 29,312 # 16/20 HES Prop Lok behind pipe ('NB' Sands), 5667 psi 47,941# 16/20 HES Prop Lok behind pipe ('NC/NE' Sands), 1098 psi ORIGINAL 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [~ Daily Report of Well Operations 16. Status of well classifications as: [] Oil I--I Gas [] Suspended Service 7. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Chip AIvord ~4.-~. ~ //~'¢ ~ ,,- f..;c~-. Title Engineering Supervisor Prepared By Name/Number: Date Kathy Campoamor, 564-5122 Form 10-404 Rev. 06/15/88 Submit In Duplicate SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPH-07 Rig Name: N-4ES AFE: 330179 Accept Date: 04/20/97 Spud Date: - Release Date: 05/02/97 Apr 21 1997 MIRU. Raise & level derrick berm & safe out equp. Rig lines to TT, pull BPV & loading pipe shed with 3-1/2" DP. Displace annulus via tubing fluid to TT with filtered brine. ND tree & NU BOP's. Rig accepted 04/20/97 @ 1500 hrs. Apr 22 1997 Test BOP's. Test waived by Doug Amos with AOGCC. Pull TWC, MU landing jt, BOLDS. LD hanger & test readings of cables. POOH with ESP compl, removing heat trace tape & ESP cable. Install 3-1/2" rams & test same. Rig floor & strap DP & BHA. MU BHA & PU & RIH with same on 3-1/2" DP. Drift & SLM. Apr 23 1997 Cont RIH with scraper & bit to 8362' (4ES KB). Corrected KB per 22E KB puts VTL @ 8375'. Circ crude & gas from well bore through choke. Returns cut with gas & oil all the way from bottoms up. POOH & LD BHA #1. MU HES SSL plug & RIH. Cut drlg line. Cont to RIH with HES SSL plug. Engage packer @ 8362' & shear off & test to 2000 psi. Rig Dowell & mix & pump sand. Slurry of 20/40 sand, 2300# calculated to fill 50' of 9- 5/8" 47# casing. POOH to 8204' & wait on sand to settle. Reverse bottoms up & prepare to tag sand plug. Apr 24 1997 RIH & tag @ 8360'. No sand. PU to 8315' & rev circ & find no sand. Rig Dowell & set sand plug #2, 4500# of 20/40 to 100' of fill in 9-5/8" csg & POOH to 7796' & wait on sand to settle. RIH to 8345'. No sand. PU to 8235' & wait 30min. & RIH to 8359', no sand. POOH for BHA #3. PU BHA #3 & RIH to 7874' & rev CBU. No sand. Cont RIH & tag sand @ 8250'. Rev circ sand from 9-5/8" @ 8250' to 8342'. Test csg & plug to 3500 psi, ok. POOH & LD BHA#3. Rig SWS to TIH to 8031' with GR/CCL with 4-1/2" rollers. Page Apr 25 1997 Cont RIH with SWS GR/CCL to 8359' (old KB). POOH, RD SWS. RIH & LD DC's. MU SWS perf guns & RIH & tag sand plug @ 8346' & space out RA tag @ 7693' (4ES KB). Rig SWS & RIH & log guns into position. Displace well bore with filtered brine. Psi guns annulus to 2500 psi & perf 8328'-8349', 4 spf. Reverse CBU & monitor well. POOH & LD guns. Rig floor to run tubing. PU & RIH with 3-1/2" 9.2# tubing. Cut drlg line. Cont RIH with 3-1/2" tubing. Apr 26 1997 Cont RIH with tubing to 8024'. Rig Dowell & perform break down & step rate & data frac & export to Anch for design & perform frac as per design pumped 50857# of 16/20 prop. 47941# behind pipe under displaced by 10 bbls. Prop was coated with 3/8 GPP with epoxy resin & monitor. Cont monitor tubing & annulus until stable. Bleed off slowly through choke. Psi. Bled quickly off with small volumes. Bled. Rev circ tubing volume to TT until clean 8.9 ppg brine returns no prop. TOH & improper hole fill on first 15 stds. TIH. Circ & monitor well, slight flow & CBU reversing. Monitor well, ok. POOH. Rig floor to RIH with BHA #4. Apr 27 1997 Cont to RIH with BHA #4. Tag fill @ 8230' & rev wash to 8250' & rev until clean. Loss of 19 bbl brine. 6 bpm 1400 psi. Rev. Perform inj test at 400 psi. Unable to inject at 600 psi. Have to travial bleed off unable to establish inj rate. Only roll pump to hold 600 psi. Went to 2500 psi & inj at 3.5 bpm & psi. Would slightly increase. Pump away 15 bbl, release psi & monitor well. Slight flow & flow back 9 bbl & well static (inj test ok). POOH 15 stds & hole fill not correct & monitor for flow. TIH 15 stds & raise brine wt. Monitor, ok. POOH. MU perf guns & RIH. Rig SWS & log guns into position. Space out perf guns. Injection test per Jim Spearman(B J) & Jim Fox(MPU) were good enough to perform frac without setting plug. Apr 28 1997 Psi annulus to 2500 & fire time delay guns 8215'-8235', 4 spf. Rev CBU & monitor well. POOH & LD SWS guns, all shots fired. RU & RIH with 3-1/2" 9.3# tubing to 7898'. Rig Dowell & perform inj test & step rate & data frac & Anch design frac & perform same screen out with 10 ppg 16/20 in perfs. Pumped total of 29312# 16/20 ppg epoxy resin coated by HES behind pipe & left 23533# in pipe. Rev out to 'IF. Remaining sand in tubing. Hold 500 psi on choke & circ to hold proppant in place until set up & shut down & monitor psi. Dropping bleed down psi slowly & open up & monitor well. POOH laying down 3-1/2" tubing. RU to RIH with clean out string BHA #5. Page 2 Apr 29 1997 RIH with BHA #5. But Drlg line. Cont RIH & tag @ 7890' (soft). Rev circ two bottoms up @ 1000 psi. Clean sand out of 9-5/8" caing 7890'-8358' using different rates on pump etc. Circ hi-vis sweep around for final clean out. Monitor well for trip & well cont to flow, wt up to 9.1 ppg. Apr 30 1997 Raise brine wt & monitor well. TOH & LD BHA #5. MU BHA #6 & RIH with same. Tag plug @ 8360' & rev circ down & latch plug & all indications show plug is latched & released. CBU. POOH & did not recover plug. TIH & tag plug @ 8360'. Engage & release plug & monitor well (stable). Cut drlg line. POOH & LD plug & retrieving tool & scraper. RIH with isolation plug with shear disk. May 1 1997 Lub rig. TIH with DP, isolation plug. Sting into packer with isolation plug & shear disk @ 8362', set down 30K, latch in, PU & shear off, LD 6 jts DP. @ 8183', pump 40 bbls HEC sweep, chase with clean brine, displace hole volume, circ until clean. Monitor well static. TOH, LD DP & DC. Pull WR, set test plug, change pipe rams to 2-7/8" & test. B. Fisher with AC)GCC waived test. RU to ESP, PU ESP drain fluid, MU ESP & Y bypass tool. May 2 1997 Measure & reset coupling extensions, MU ESP with Y bypass tool, w/inst tube 2n~ jt (original cplg was beside seal sec on ESP causing OD restriction) MU flat lead & guard. PU 2 jts 2-7/8" from shed, TIH with 2-7/8" tbg ESP assy, fill each row. RU heat trace. TIH with 2-7/8" compl with heat tract/ESP. Space out, MU heat heat trace/sep cable to land tubing. May 3 1997 MU ESP pigtail splice, MU to hanger, check ESP-ok. Land hanger, RILDS, LD landing jt, set TWC. ND BOP. NU tree & flange. Test tree & adapter flange, 5000#. Check ESP, ok. Heat trace check, ok. Pull TWC, set BPV, RD cellar, secure well. Rig released 05/02/97 @ 1400 hrs. Page FILE COPY BP EXPLORATION (ALASKA) INC. Milne Point Unit TO: S. Rossberg FROM: J. Fox DATE: 04/25/97 RE: MPU H-07 Nce 'SAND DATA FRAC AND PROP LOK FRAC SERVICE CO'S.: Dowell, Halliburton, Nabors 4ES, Peak JOB SUMMARY INJECTIVITY TEST Design Rate, Bbls Max Rate, Final ISIP, NWB friction, "Treat'grad, BPM Bumpe..d. bpm Annulus psi PS!. p. si .. psi/ft max. 61 34 lO95 1020 0.68 ., DATA FRAC Bbls Bbls'Slick ' Time on peris Final Annuius, IsIP, psi NWB friction,' Treat grad~ . Pumped wtr. to Perfs ......... psi psi psi/ft 100 100.3 5:05 1226 1080 0.70 ...... FRAC ,. sand Lead prop Tall'prop Design total '" Treesaver pumped, behind pipe, behind behind pipe, Liner Sand, rubber left in Job was M# M# pipe, M# M# M# hole? /size /size Flush 50,857 # "47,9~1 # n~)t 40,000 # 2916 # not 16/20 16/20 . . applicable ... applica, ble Ft of sand' Esiimated Final ISIP,' psi ISIP Incr Actual ' TSO, deSign, TSO, in Pipe sand top Ann. psi over datafrac sand:pad min Nolte ratio Plot , ,, 68' 8200' 1413 1350 270 5.2 2.4 13 ............... 06/03/97 10:09 AM DATA FRAC & FRAC SENT VIA MICROSOFT MAIL BPM I PSIG I PSIG BBL BBL PUMPII,~G SUMMARY COMMENTS Operational problems - Lost one of the pumps on over speed during the Injectivity test. Rates were already at 32 BPM so the call was made to hold that rate. - Unable to attain the Iow pump rate of 0.5 bpm for the step rate test (as per procedure) with the pumps available. - The pressure transducer on the treating line froze up during the first part of the frac. Pressures were monitored off of the pump discharge until a heater thawed out the ice plug below the transducer. Bottomhole pressures were being monitored through (live) annulus pressures. Comments - To save the cost and logistics of hauling / heating source water from MPU, fresh water from the hot water plant in PBU was utilized to build the HEC gel. 1% KCI was added as a precaution against swelling clays. - In order to reduce friction pressureand produce consistent pressures on the Injectivity test, slick water was circulated into the tubing prior to the start. - There was little or no net pressure rise by the time the last few stages of slurry were being pumped so 25% excess was pumped. Shortly before the last of the excess was pumped the bottomhole treating pressure increased rapidly indicating an impending screenout. Just as flush was called the treating pressure broke back and stabilized. Flush was pumped w/10 bbl. of underdisplacement and the pumps shut down. - Once the last of the prop. was 1/2 way out of tbg. started slowly ramping down rate to a minimum of 15 bpm. in hopes of inducing a screenout. There was little or no noticeable affect. Samples of resin coated prop. were monitored following the frac. Lab samples suggested a 1 to 1.5 hr. set up time. Surface samples indicated that the prop. dropped out of the gel and got tacky quickly. After 1 hour there was some compressive strength which increased with time. After 6 hours the sand grains could still be separated but was "fairly firm". It was competent enough that it was felt safe to slowly bleed the 250 psi annulus pressure off of the well. It took very little vol. to bleed off to zero. The Prop Lok surfactant was pumped at a concentration of I gpt for a design of 11.5 gal. Actual pumped was 12.2 gal. The resin was pumped at a design concentration of 3/8 gal./sk for a design total of 190.7 gal. Actual pumped was 187.7 lbs. The resin lines were primed with 3.3 gal. diesel and started when sand was started. On future jobs the resin lines should be started sooner to displace the diesel load and get resin to the blender intlet at the same time the sand gets there. Proportioning of the resin followed the slurry concentration well. MPU FILE COPY DATE/TIME OPERATIONS SUMMARY 04/25/97 weather: 8 deg. ambient, -17 deg. WC, wind - 12 mph 0730 MIRU Dowell frac fleet and Halliburton Prop Lok unit. 1030 Pre-job safety meeting. 1124 Pressure test surface treating lines and pump kick outs. 1135 Circulate 71 bbls of slick source water (1.5 gpt J313 ) down tbg. at 10 to 20 bpm to load tbg. Taking returns to pits. 1141 Close pipe rams on 3.5' work string. 1145 Start breakdown / injectivity test. 1150 With 61 bbls. away shut down pumps and monitor pressure falloff. ISlP = 1020 psig. 1157 Start step rate test at minimum rate of 1 bpm. 1222 At stabilized rate of 10 bpm shutdown step rate test. 120 bbls pumped~ 1232 Start data frac 1238 With 100 bbls of slick source water pumped for data frac shutdown pumps and monitor pressure falloff. 1535 Start Frac 1553 Stage flush 1555 Start slowing rate down in attempt to induce screenout. 1557 Stabilize rate at 15 bpm. 1558 With 10 bbls. of undisplacement flush was complete and the pumps were shut down. Monitor pressures for 15 min. and start rig down. PUMPING SUMMARY TIMEI RATE I ANNPIWHP I STAGE CUM COMMENTS I I PS GIPS GI BBL BBL 04/25/97 INJECTIVITY TEST DISPLACEMENT = 92.6 BBLS 145 0/,, 9 210 0 0 Prep. for breakdown. Slick source water in tbg. and 9.0 ppg NaCl brine in the tbg. / csg. annulus 147 34.5 1168 3354 34.5 95.5 Max. rate reached. 147.5 31.5 1098 2947 37.3 107.4 Lost rate when one of the pump trucks went down on overspeed. Maintain that rate. 148 31.5 / 0 1095 2714 31.5 132.3 S/D pumps ending Injectivity Test. Monitor fall off pressures. ISIP - 1020 psig. 149 0 835 1043 31.5 132.3 Monitor falloff pressures 153 743 892 157 589 741 STEP RATE TEST 1157 I 591 750 0 132.3 Pump at min. rate. 1.!59 1.0 884 1084 1.7 Rate and pressure stable. Increase rate to 1.5 1201 1.5 974 1150 4.1 Rate and pressure stable. Increase rate to 2.0 MPU FILE COPY PUMPING SUMMARY TIME RATE ,ANNP, WHP ISTAGE , CUM COMMENTS BPMIIIIPSlG PSlG BBL BBL 1203 2.0 1031 1217 7.5 Rate and pressure stable. Increase rate to 2.5 1204 2.5 1054 1249 12.3 Rate and pressure stable. Increase rate to 3.0 1206 3.0 1074 1300 18.5 Rate and pressure stable. Increase rate to 3.5 1208 3.5 1093 1340 27.0 Rate and pressure stable. Increase rate to 4.0 1210 4.0 1106 1390 34 Rate and pressure stable. Increase rate to 5.0 1212 5.0 1121 1377 44 Rate and pressure stable. Increase rate to 6.0 il 214 6.0 1137 1436 53 Rate and pressure stable. Increase rate to 7.0 1216 7.0 1146 1528 63 Rate and pressure stable. Increase rate to 8.0. 1218 8.0 1155 1546 79 Rate and pressure stable. Increase rate to 9.0 1220 9.0 1161 1542 98 Rate and pressure stable. Increase rate to 10.0 1222 10.0 1166 1590 120.1 Stable rate and pressure. Formation parting has occurred. S/D pumps ending step rate test. Allow fracture to close,' monitor falloff pressures. 1224 0 857 1011 120.1 252.4 1226 0 798 951 1228 736 883 1230 683 832 DATA FRAC 1232 0 604 750 0 252.4 ~1233 12.8 1258 1835 254.6 Start pumping 100 bbl. slick source water for data frac. 1233.5 20.1 1245 2119 267.0 Rate established 1236 19.9 1223 2164 316.1 1238 20.1 1226 2187 351 End data frac. S/D pumps and monitor falloff pressures. ISlP = 1060 psig. 1240 0- 871 1020 352.7 Fall off pressures 1245 734 887 ~1250 6O2 75O 1255 490 635 1300 4O8 553 1305 346 489 1310 293 443 1315 254 397 FRAC 1536.5 0 40 283 0 0 Start pumping 60 ppt HEC pad. 1537 20 1261 na 10.7 10.7 rate established 1538.5 20.1 1217 na 42.1 5 Pumping 1 ppg slurry with Prop Lok. 1542 20.1 1208 na 115 Stage in 2 ppg to 10 ppg ramp. Fluid temp. = 88 deg. F. MPU FILE COPY ,-- PUMPING SUMMARY TIME RATE ,ANNP, WHP ,STAGE , CUM COMMENTS BPMIIIIP$1G PSIG, BBL BBL 1545 20.2 1190 na I 167 5.3 ppg 1547 20.2 1173 na I 211 7.9 ppg 1548.5 20.1 1173 na I 243 10 ppg 1550 20.1 1197 4091 I 271 10 ppg. Pressure transducer thawed out and I , operational. 1552 19.9 1521 4389 311 Treating pressure increasing rapidly. 1553 20.6 2288 5208 327 Max. recorded pressure before falling off. Call for flush 1555 20.9 / 18 1567 4380 368 Start rate reduction in attempt to induce screen out. 1556 18.4 1450 3533 390 '1557 15.3 1404 2828 405 1557.5 10/0 1316 1427 81.6 413.1 Reached desired flush vol. S/D pumps 1600 0 1155 1285 Monitor pressure falloff. ISlP = 1350 psig 1605 1034 1166 1610 968 1098 End of job - start rig down MPU FILE COPY Page 6 FLUIDS PUMPED DOWNHOLE INJ TEST& DATA FRAC: 220 Bbls FRAC: 333 Bbls 553 TOTAL FLUIDS PUMPED DOWN HOLE LOAD VOLUME MPU FILE COPY ~5 P.i BP EXPLORATION SUBJ EI,~T ~tY~P .I..~"---O "r BASED ON ENGINEER~ ENGINEERING DATA c).w--/q .~. ~HEET NO. OF BUDGETIAFE NO, DEPT. APP'VL DATE FILE NO. 1~-7/ .. ~o~0 To~- STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOGuL''' 5 1. Status of Well Classification °~b~&'e'~h~r"'"~~,- ~ -u ~ Oil ~ Gas ~ Suspended ~ Abandoned ~ Se~ice '- · 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 95-142 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22597 4. Location of well at sudace 9. Unit or Lease Name 2709'At to~ ofNSL'productive4079' WEL,inte~alSEC. 34, T13N, R10E, UM ~?-;?~¥~7'L~'.;::;-~~ ~". .... pATT,* ' : 2j" '~~~' 10. MilneWell NumberP°int Unit 3631 SNL, 3214' WEL, SEC. 2, T12N, R10i, UM ~ .J~~__ [ [,'~~ [ MPH-07 At total depth ~ ~~3 ~~ 11. Field and Pool 4731' SNL, 2380' WEL, SEC. 11, T12N, R10E, UM ~ ~'~<~~--'~ ' Milne Point Unit /Schrader Bluff 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease O~'~i~g~~d Ser KBE = 65.05'~ ADL 380109 12. Date Spudded9/9/95 113' Date T'D' Reached ] 14' Date C°mp" Susp" °r Aband'[15' Water depth' if °fish°re [ 16' N°' °f c°mpleti°ns9/22/95 1/30/97 N/A MSL[ One l~.Tot~,~o~th,M~+~O,l~900 ~T.~1~.~u~c~h`~+~19.~°t~°n~'su~[=~.~th~h~sssv~tl=~.Th~°~°f~m~*°~~9~ 4265 FT} ~Yes ~No N/A MB 1800' (Approx.) 22. Type Beotrio or Other Logs Run MWD, CDN, CDR, GR/CCL ~23. CASING, L~NER AN~ CEMENTING RECORD CASING SE~NG DEPTH HOLE SIZE Wl. PER FT. G~DE TOP BOSOM SIZE CEMENIING RECORD AMOUNT PULLED 20" 91.1~ H-40 32' 112' 24" 250 sx Arcticset I (Approx.) 9-5/8" 40¢ L-80 31' 9217' 12-1/4" 1484 sx PF 'E', 747 sx Class 'G', 50 sx Class 'G' I 24. Pedorations open to Production (MD+~D of Top and 25. Tu8~Na RECOR~ Bottom and internal, size and number) S~ZE DEPTH SET (MO) PACKER S~ (UD) 7" Gun Diameter, 12 spf 2-7/8", 6.5~, L-80 7754' N/A MD ~D MD ~D 8674'-8695' 4187'-4193' 8906'-8927' 4252'-4258' 26. ACID, FRAClURE, CEMENI SQUEEZE, ETC. DEPIH INTERVAL (MB) AMOUNI & KIND OF MAIERIAL USED Freeze protect with 150 bbls diesel Frac Pac, 8373'-8668' 31000~ 16/20 Carbolite behind pipe Frac Pac, 8720'-8942' 13000¢ 16/20 Carbolite behind pipe EZSV Retainers ~ 9065' & 9070' Pumped Class 'G' Cement: 36 bbls below & 10 bbls on top 27. PRODUCTION TEST Date First Production ]Method of Operation (Flowing, gas li~, etd.) Februaw 10, 1997~ Electric Submersible Pump Date of Test Hours Tested PRODUCTION FOR O~L-B8L GAs-Mc] WATER-B~L CHOKE S~ZE [GAS-O~L RAT~O TEST PER~OD I Flow Tubing Casing Pressure CACCUmTEO O~c-B8L GAS-MCF WATER-BeC O~L Gmww-API (CORR) Press. 24-HOUR ~TE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent 0ips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate -~' Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. (Subsea) SBF1 8195' 3998' SBE4 8316' 4029' SBE3 8348' 4037' TSBD 8631' 4109' TSBB 8877' 4178' SBA5 8966' 4204' "~1. List of Attachments Summary of Daily Drilling Reports, Surveys '~2. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed .... ChipAIvord ,/'~,_.~,~>-~_ -~ L/'-.J~'.-{.~ Title Senior Drilling Engineer Date 7//'Z<([';'?7 MPH-07 95-142 Prepared By Name/Number: Kathy Campoamor, 564-5122 Well Number Permit No. / Approval No. .... ~NSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference {where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Alaska 0il & 6~s Cons. 'Anchorage Form 10-407 Rev. 07-01-80 :) 58.46 , ~41.5~ 'i' 22 5513' ,. B ,P.J~.~~..~4.38 ',,:_. ..... SPXi, '_,..'~..~. , "' , "-, ~/- ..'..... :%--. '-'.. / oxY"'US~A 8.81 ~01 ADL0 ,26.8~1 ~SA 8.81 AD BP E & :.0~64. BPX 26.8,:! USA 8.81 ....... ADL0 .)9-0~ 25515 BPx 26.81 OXY USA 8.81 .~1 ........ OXy USA 8~.81 .......................... i .................. -:'-"/':'-"-'[ ................................ i ....................... -~'~- ..... ........ . ...... ~1_.0'~30i 9 A BP E BP E & OXY 1-29-01 01-29-01 ADL ABL 15848 025516 58.46 ARU"~ BPE&O64.38 / 41 ..5~ BPX '41 .,~4BPX 26.81 ,,,,,,,.,. 8.81 ISAK 17 34 552O WEST SAK 2S ~ ,BPE & 0 "BP I~ & O- BPX 26.81 1110-30-79'~ "'",., -./OXY LISA 8.{ .1'~ 10-',~0-79 ADL 047~43-3~:,~AD k0, ~74: BPE & Q 6.4 USA OXY USA/ ADL0~TZ~ BP'E I~PX 26',.8~';. OXY USA 8.~ MPU MPU ~01 ' 9-01, ~01-; 1~ ARCO ~' 58 BPX '41.54 · 5629 ARCO BPX 41'"~'' ;' i~~,)... ,,, /""'¢~"'~'.7,~84~ 03-27-84 10 ADL 2562.~~,, ......... ADL025627 ARCO ' 58.46 BPX 4'1.54 BPX .19 91.1~9 OX~ U~8.81 ;A 8.81 OXY A AD ~ 0 A[ BP/AAI SHARED SERVICE DAILY OPERATIONb PAGE: 1 WELL: MPH-07 BOROUGH: NORTH SLOPE UNIT: UNKNOWN FIELD: UNKNOWN LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 09/08/95 03:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 22E WO/C RIG: 09/09/95 (1) TD: 245'( 0) 09/10/95 ( 2) TD: 2201' (1956) 09/11/95 ( 3) TD: 4681' (2480) 09/12/95 (4) TD: 5397' ( 716) 09/13/95 (5) TD: 7682' (2285) 09/14/95 (6) TD: 9240' (1558) DRILLING MW: 0.0 VIS: 0 BLOWDOWN & DISCONNECT LINES. MOVE PIPESHED,MOTOR COMPLEX, MUD PITS. MOVE SUB OFF MPH-06. SET MATS & LINER. SET SUB OVER MPH-07. SET MUD PITS & MATS. SET CUTTINGS TANK & PIPESHED. SET MOTOR SHED & MATS. SET PARTS HOUSE,SET 2ND PIPESHED,FUEL TANK, BUILD BERMS,SET PIPESHED TIOGA,ADD WATER TO PITS & START MIXING SPUD MUD. NU SPACER SPOOL,DIVERTER SYSTEM & FLOWLINE. HOLD PRE-SPUD MEETING. FUNCTION TEST DIVERTER, HOLD DIVERTER DRILL. PU & MU BHA, STANDBACK DC'S. DRILL F/l12' T/245' CBU MW: 0.0 VIS: 0 DRILL F/245' T/1058'. SHORT TRIP,9 STDS. OK. DRILL F/1058' T/1822' CBU,GAS CUT MUD. WELL NOT FLOWING, GAS ENDED WITH BU. DRILL F/1822' T/2010'. CBU TWICE,GAS CUT MUD STILL COMING UP,WELL NOT FLOWING. DRILL F/2010' T/2201'. WT UP F/9.9 PPG T/10.0 PPG. CBU. PREPARE TO SHORT TRIP. DRILLING MW: 0.0 VIS: 0 CIRC & MONITOR WELL. SHORT TRIP 2201' T/1058'. OK. REAM LAST STD TO BOTTOM. NO FILL. DRILL 2201' T/3440' CBU. SHORT TRIP 3440' T/2201'. OK. REAM LAST STD TO BOTTOM. NO FILL. DRILL 3440' T/4681' PREPARE TO CIRC FOR BIT TRIP. DRILLING MW: 0.0 VIS: 0 CIRC GAS CUT MUD,ONE BOTTOMS UP. PUMP SWEEP & INCREASE MUD WT T/10.1. WELL STILL BUBBLING GAS. CIRC INCREASE MUD WT. SHORT TRIP 4681 TO 3440'. OK, SOME GAS W/ BU. DRILL F/4681' T/4968'. INCREASE MUD WT TO 10.6 PPG. CIRC BU. MONITOR WELL, PUMP DRY JOB. POOH. BACKREAM 2515 TO 2210. HOLE WANTED TO SWAB. LD LC, CHANGE BITS,PU CDR. SERVICE TOP DRIVE,CHANGE HOSE ON IRON ROUGHNECK. RIH. WORK THRU TIGHT SPOTS F/2100' T/2500' WITHOUT PUMP. DRILL F/4968' T/5397' DRILLING MW: 0.0 VIS: 0 DRILL F/5397' T/6159'. SHORT TRIP F/6159' T/4960'. PU 30 JTS DP. OK. DRILL F/6159' T/7206'. SHORT TRIP F/7206' T/6159'. OK. DRILL F/7206' T/7682' CIRC HI/LOW SWEEP MW: 0.0 VIS: 0 DRILL F/7682' T/8250'. CIRC & MONITOR WELL. SHORT TRIP 8250' T/7206'. OK. DRILL F/8250' T/9240'. CIRC HI/LOW SWEEP AROUND. WELL : MPH-07 OPERATION: RIG : NABORS 22E PAGE: 2 09/15/95 ( 7) TD: 9240' ( 0) 09/16/95 (8) TD: 9240' ( 0) 09/17/95 ( 9) TD: 9240' ( 0) 09/18/95 (10) TD:10315' (1075) 09/19/95 (11) TD:12020' (1705) RUNNING 9-5/8" CASING MW: 0.0 VIS: 0 MONITOR WELL, PUMP PILL. POOH TO JARS, RIH T/1800'. BACK REAM 2600' TO 2200', SWABBING. RIH, FILL 1/2 WAY IN, CIRC LAST STD TO BOTTOM. CIRC LOW/HIGH VIS SWEEP. CONDITION MUD W/GELATION TREATMENT. CIRC ESS DOWN, MONITOR WELL, PUMP PILL. POOH TO BHA, NO PROBLEMS. LD BHA. RU CSG EQUIPMENT, RIH W/3 JTS CSG. RU WEATHERFORD PACKER. RIH W/9-5/8" CASING TO 48 DEG, THEN STARTED TO READ DIFF TVD'S. DIFFERENCE OF 74', ASM CLOSE. INSTALLING WELLHEAD MW: 0.0 VIS: 0 FINISH RUNNING 9-5/8" CASING. TOTAL OF 224 JTS. SHOE @ 9217'. RU CEMENTING HEAD, CIRC 680 BBLS MUD, 2-10 BPM @ 850 PSI. PUMPED 10 BBLS WATER, TESTED LINES T/3500, PUMPED 10 BBLS WATER & DROP BOTTOM PLUG, 70 BBLS OF NSCI SPACER, 301 BBLS 'E' CEMENT, 153 BBLS 'G' CEMENT, DISPLACED W/466 BBLS WATER & 221 BBLS MUD. PRESSURE INCREASE T/1800 PSI @ 10 BPM, REDUCED RATE AS NEEDED TO KEEP PRESSURE @ 1800 PSI, @ 1 BPM LET PRESSURE CLIMB T/1880 PSI & ES CEMENTER OPENED, LEAVING 38 BBLS CEMENT IN CASING. CBU, GOT SPACER & 5 BBLS CEMENT TO SURFACE. INJECT PIT MUD VOLUME DOWN TREAT CONTAMINATED MUD, WAIT ON GUZZLER. PUMPED 75 BBLS WATER, 272 BBLS 'E', 10 BBLS 'G' CEMENT, DROPPED PLUG, DISPLACED W/229 BBLS WATER, CLOSED ES CEMENTER. GOT BACK WATER & 9 BBLS OF CEMENT. ND DIVERTER, WASHOUT CEMENT. INSTALL WELLHEAD. DRILLING ES CEMENTER MW: 0.0 VIS: 0 FINISH NU GEN 5 WELLLHEAD & TEST SEALS T/1000 PSI. NU 13-5/8" BOPE. TEST CHOKE MANIFOLD, BOP, & EQUIP F/250 T/5000 PSI. IBOP FAILED. REMOVE PIPE HANDLER, CHANGE IBOP, INSTALL PIPE HANDLER. TEST IBOP. OK. HAD PROBLEM SCREWING INTO TEST PLUG & REMOVING. PIECE OF REBBER GOT INTO THREADS & THEN IT WAS COCKED COMING OUT OF HOLE. INSTALL WEAR RING. SERVICE TOP DRIVE. MU BHA. PU 5" GRADE 'E' DP & RIH T/2950'. DRILL OUT CEMENT & ES CEMENTER @ 3020'. SHORT TRIP MW: 0.0 VIS: 0 RIH T/8335'. TAGGED CEMENT. DRILL CEMENT F/8335' T/9118'. DRILLED PLUG @ 8362'. CBU. TEST CSG T/3500 PSI FOR 30 MIN. OK. DRILL LANDING COLLAR, FC CEMENT & SHOE. DRILL F/9240 T/9250'. CBU, RUN LOT, 15.5 EMW. DRILL F/9250' T/10315'. CIRC, PUMP PILL, SHORT TRIP TO MOVE HWDP TO TOP OF HOLE. HAVING TROUBLE SLIDING. DRILLING MW: 0.0 VIS: 0 POOH WITH 12 STDS DP, 15 STDS HWDP. MONITOR WELL, BLOWDOWN TOP DRIVE, RIH WITH 12 STDS DP. REPAIR WASHED OUT MUD END ON #1 PUMP, SERVICE TOP DRIVE, NEW MUD ON LOCATION, WILL CHANGEOUT ON RIG MOVE. RIH T/10315' WITH HWDP. DRILL F/10315' T/12020'. .mLL : MPH-07 OPERATION: RIG : NABORS 22E PAGE: 3 09/20/95 (12) TD:13478' (1458) 09/21/95 (13) TD:13728' ( 250) 09/22/95 (14) TD:15055' (1327) DRILLING MW: 0.0 VIS: 0 DRILL F/12020' T/13185'. CBU, MONITOR WELL, PUMP PILL. POOH WITH 30 STDS DP, 15 STDS HWDP. SERVICE TOP DRIVE. RIH WITH 17 STDS DP, PU & RIH WITH 39 JTS DP, 15 STDS HWDP ON TOP. DRILL F/13185' T/13478' DRILLING 8-1/2" HOLE MW: 0.0 VIS: 0 ATTEMPT TO SURVEY. MWD FAILED. CBU. MONITOR WELL & PUMP PILL. POOH. OK. DOWNLOAD CDN SOURCE & LD MWD. DOWNLOAD CDR & CDN. MU BIT, MWD, LOAD SOURCE & ORIENT SAME. SLIP & CUT DRILLING LINE. SERVICE TOP DRIVE. FINISH TIH. OK. DRILL 8-1/2" HOLE F/13478' T/13728'. DRILLING 8-1/2" HOLE DRILL 8-1/2" HOLE F/13728' T/15055'. MW: 0.0 VIS: 0 09/23/95 (15) TD:15900' ( 845) 09/24/95 (16) TD:15900' ( 0) 09/25/95 (17) TD:15900' ( 0) DOWNLOADING CDN MW: 0.0 VIS: 0 CIRC SWEEP AROUND. SHORT TRIP T/13445' OK. DRILL 8-1/2" HOLE F/15055' T/15900'. CIRC SWEEP AROUND. DROP EMS & PUMP DOWN. MONITOR WELL & PUMP PILL. POOH. OK. DOWNLOAD SOURCE. LD CDR, MWD, CDN. DOWNLOAD CDN. CIRC OUT CONTAMINATED CMT MW: 0.0 VIS: 0 FINISH LD LWD TOOLS & CLEAR RIG FLOOR. MU 8-1/2" RE-RUN BIT & BHA %5. TIH TO CASING SHOE WHILE GEOLOGIST ANALIZE LOGS. SLIP & CUT DRILLING LINE. SERVICE TOP DRIVE. CIRC & PUMP DRY JOB. POOH. LD BHA. MU MULESHOE & TIH T/15900'. CIRC & COND MUD. MIX & SPOT 350 SX CLASS 'G' @ 15.8 PPG BALANCED PLUG. POOH 15 STDS. CIRC OUT CONTAMINATED CMT. MONITOR WELL & PUMP PILL. MU 9-5/8" RTTS MW: 0.0 VIS: 0 POOH TO CASING SHOE LD 5" DP. JERRY HERRING WITH AOGCC WAIVED. TAGGING TOP OF CEMENT PLUG. FINISH POOH FROM CASING SHOE. MU 9-5/8" EZSV & TIH T/9070'. SET EZSV @ 9070'. MU CEMENT HEAD & ESTABLISH INJECTION RATE 4 BPM W/800 PSI. MIX & PUMP 100 SX CLASS 'G' @ 15.8 PPG. PUMP 16 BBLS BELOW EZSV & LEFT 4 BBLS ON TOP OF EZSV. POOH ONE STD. CIRC OUT CONTAMINATED MUD. ATTEMPT TO TEST CASING. BROKE DOWN @ 2300 PSI. CHECK ALL SURFACE EQUIP. OK. RE-TEST CASING. BROKE DOWN @ 2300 PSI. CIRC & COND MUD. POOH WITH PLUG CATCHER. MU A STAND DC'S & PU 9-5/8" RTTS TO RIH & ISOLATE LEAK. ,fELL : MPH-07 OPERATION: RIG : NABORS 22E PAGE: 4 09/26/95 (18) TD:15900' ( 0) 09/27/95 (19) TD:15900' ( 0) 09/28/95 (20) TD:15900' ( 0) TIH WITH 9-5/8" EZSV MW: 0.0 VIS: 0 TIH WITH RTTS TO LOCATE LEAK. MADE SETS @ 1615',2565',3650', 6545',8955'. TAGGED CEMENT @ 8960'. CASING TESTED GOOD ABOVE 8955' BUT LEAKED OFF BELOW 8955'. EST INJECTION RATE 4 BPM @ 2000 PSI. POOH & LD RTTS. MU BIT & SCRAPER & TIH T/2000'. SLIP & CUT DRILL LINE. FINISH TIH WITH BIT & SCRAPER T/8960'. DRILL RATTY CEMENT F/8960' T/9070'. CIRC & COND MUD. POOH WITH BIT & SCRAPER. MU 9-5/8" EZSV & TIH. NU 2-9/16" 5M TREE MW: 0.0 VIS: 0 TIH WITH 9-5/8" ESZV. SET EZSV @ 9065'. TEST ANNULUS T/3000 PSI. OK. EST INJECTION RATE @ 4 BPM WITH 1950 PSI. MIX & PUMP 150 SX 'G' @ 15.8 PPG. SPOT 20 BBLS BELOW EZSV, UNSTUNG FROM EZSV & SPOT 10 BBLS ON TOP OF EZSV. SHEAR OUT PLUG CATCHER & PULL 2 STDS SLOW. CIRC OUT CONTAMINATED MUD & CEMENT. TEST CSG T/3000 PSI. OK. DISPLACE WELL WITH 8.4 PPG SEAWATER. POOH T/2000' LAYING DOWN 5" DP. FREEZE PROTECT 2000' 9-5/8" CSG WITH 150 BBLS DIESEL. FINISH POOH LAYING DOWN 5" DP. PULL WEAR RING, CLEAR FLOOR & ND 13-5/8" BOPE. INSTALL TBG HANGER, ADAPTER FLANGE & NU 2-9/16" 5M TREE ASSY. FINAL REPORT MPH-07 MW: 0.0 VIS: 0 FINISH NU 2-9/16" TREE. TEST T/5000 PSI. OK. PULL 2 WAY CHECK & INSTALL BACK PRESSURE VALVE. FREEZE PROTECT MPH-06. RIG RELEASED @ 0900 HRS. SIGNATURE: (drilling superintendent) DATE: SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPH-07 Rig Name: N-4ES AFE: 330179 Accept Date: 01/19/97 Spud Date: - Release Date: 01/30/97 Jan 20 1997 MIRU. Raise, scope derrick. Rig accepted 01/19/97 @ 1930 hrs. ND tree, set test plug. NU BOP, change out rams to 3-1/2". Test BOP. Test witness waive by AOGCC B. Foster. Set wear ring. Load pipe shed with 3-1/2" workstring. MU BHA 9-5/8" scraper, mule, SLM, drift/install seals, PU workstring. Jan 21 1997 PU, RIH with workstring, install ring/drift to 8963'. Circ filter with Baroid de-filter unit. TOH, LD scraper BHA. Test 9-5/8" to 3000#. PU sump packer, RIH. Slip, cut drilling line. RIH with packer. Jan 22 1997 RU SWS, E log. RIH with GR/CCL, 3670'. Pump to 3708', log won't go, POOH. MU 2" wt bar, RIH with GR/CCL, pump down 3670-4435. No go, POOH. MU SWS tools on smaller wireline. Install press cups. RIH w/SWS GR/CCL, pump tools to 8384'. Tools would not go farther, POOH. Mix lube in slug pit, did not use. RD SWS. Set packer @ 8942'. LD 3 jts 3-1/2" tubing, TOH. RU SWS perf guns, RIH on 3-1/2" tubing. Tag sump packer @ 8942', PU 14', fire guns, perf 8906'-8927'. Jan 23 1997 Rev circ tubing volume. Fluid loss while circ. TOH with 3-1/2" tubing (improper hole fill). Circ & monitor well. Cont TOH with tubing & LD perf guns. MU BHA & RIH w/same. Engage packer @ 8941' & circ & perform casing wash with diesel & Zanvis & caustic wash & filter brine with Baroid DE press. Page Jan 24 1997 Cont to rev circ & filter NACL. POOH & LD BHA. MU HES Frac pac assy. RIH with frac pac assy on 3-1/2" tubing. Tag sump packer @ 8942'. Space out & drop ball & set 9-5/8" VTL packer. Psi tubing to 3000 & psi annulus to 2500, hold & cont to 3000 psi and expend ball & bleed off psi. PU 25K above wt & return to neutral point & psi. Tubing to 4000 psi. Release the running tool & reverse out the setting ball. Test lines to 5600 psi (having problems priming up due do to frac job) Found ice plug in lines. Pump acid & put in place with source water & reverse out with rig pump. Jan 25 1997 Data frac & design frac per Anch. Frac OB sands as design pumped 34800# 16/20 sand. Put 13000# behind pipe & reverse out 21800# after screen out to 4500 psi. Monitor 1 hr & re-stress frac 2 times to 1800 psi. Blow down lines & RD frac lines. TOH with frac tool. Well begin not taking correct fill with 30 stds out. CBU at 5930' (well not taking or gaining while circ) Stable while monitoring although gas breaking out. RIH, circ & wt up brine to 9.0 (gas & oil on bottoms up) TOH & LD running tool. MU JP plug & RIH with same. Setting HES JP plug. Jan 26 1997 Lub rig. Attempt to set SSL plug. No success (angle too high for dn wt) CBU & monitor, slight flow. Circ & wt NACL to 9.1 ppg. POOH & LD setting tool & SSL plug. PU DC & MU SSL plug & RIH with same. Set & test plug to 2000 psi & monitor well. POOH. MU perf fun & RIH with same. Jan 27 1997 Tag SSL plug & space out - TCP guns - close bag, pressure tubing to 1500 psi. Bleed to 0 psi & perf 8674'-8695'. Rev tbg volume 2 times. Monitor well. POOH, LD perf guns. Misfire on 2 shots. MU HES SSL ret tool & PU DC & RIH to 8717'. Rev circ 2 tubing volume & PU to 8668' above perfs & filter brine w/Baroid DE press. Engage & release SSL plug. Did not see shear out. Rev circ 2 tubing volumes & monitor well. POOH & LD SSL plug. MU HES screen assy 9-5/8" VTL packer. RIH with frac pac assy. Page 2 Jan 28 1997 Cont RIH with HES frac assy. Sting into 9-5/8" packer @ 8719' & space out & set packer @ 8373' Pull test @ 10K over. Cont set packer to 3000 psi & test annulus to 2500 psi. Shear ball @ 2800 psi w/2500 on tbg & shear tool from packer & rev out setting ball. Test BJ lines to 5500 psi. Perform slow rates & perform injectivity test & mix HEC gel & perform frac. Pumped total of 54000# 16/20 sand & screened out had a total of 31000# behind pipe & rev 23000# out. Let settle 1 hour & re-stress frac to 1800 psi. Rev bottoms up & allow frac to close. Monitor well & flowing slightly. Rev bottoms up again. POOH, LD 3-1/2" tbg. Jan 29 1997 Cont to POOH, LD tbg & HES frac tool. Change rams to 2-7/8" & test. RU & run ESP assy. Installing heat trace on last 2250'. Jan 30 1997 RIH with ESP compl & space out MU hanger & landing jt. MU splice at hanger & test. Land tbg, RILDS. ND BOP's & NU tree & test to 5000 psi. Rig test lines & freeze protect to 2000' with diesel. RD lines & secure tree & cellar. Rig released 01/30/97 @ 0100 hrs. Page 3 'fRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 BP EXPLORATION (ALASKA) INC MILNE PT/MPH-07 500292259700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/20/95 DATE OF SURVEY: 091495 ELECTRONIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-50083 KELLY BUSHING ELEV. = 65.90 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -65.90 115 115.47 49.57 208 208.47 142.57 304 304.00 238.10 399 399.74 333.84 0 0 N .00 E .00 0 9 N 12.80 E .14 0 13 N 28.32 E .09 0 15 N 40.96 E .07 0 15 N 49.26 E .04 .00N .00E .00 .16N .04E -.15 .44N .15E -.42 .77N .38E -.71 1.07N .68E -.97 495 495.34 429.44 590 590.56 524.66 686 686.07 620.17 781 781.53 715.63 877 876.84 810.94 0 8 S 12.16 E .36 1 3 S 28.52 W 1.01 2 12 S 35.72 W 1.22 2 45 S 15.97 W 1.06 3 45 S 17.30 W 1.05 1.09N .86E -.97 .20N .47E -.14 2.075 1.03W 1.92 5.785 2.74W 5.37 10.985 4.30W 10.31 972 971.45 905.55 1067 1066.62 1000.72 1160 1158.46 1092.56 1255 1252.61 1186.71 1351 1345.80 1279.90 5 20 S 7.41 W 1.86 6 46 S 4.51 W 1.52 7 41 S 4.48 W .99 10 6 S .96 E 2.68 14 55 S 4.38 E 5.12 18.345 5.80W 17.41 28.395 6.82W 27.24 40.005 7.73W 38.63 54.725 8.09W 53.17 75.365 7.01W 73.78 1446 1437.77 1371.87 1542 1529.08 1463.18 1637 1618.97 1553.07 1732 1708.33 1642.43 1828 1796.40 1730.50 16 17 S 6.32 E 1.54 17 57 S 5.48 E 1.76 19 45 S 4.06 E 1.96 22 15 S .36 E 2.95 23 44 S 4.04 E 2.16 100.955 4.59W 99.46 128.955 1.71W 127.59 159.545 .82E 158.26 193.815 2.08E 192.39 231.145 3.55E 229.59 1924 1883.19 1817.29 2019 1967.23 1901.33 2113 2048.24 1982.34 2208 2126.09 2060.19 2304 2203.60 2137.70 25 55 S 3.93 E 2.28 29 6 S 5.22 E 3.42 33 17 S 6.73 E 4.49 35 16 S 6.68 E 2.11 38 13 S 7.20 E 3.06 271.205 6.34E 269.67 314.835 9.86E 313.38 363.625 15.01E 362.42 416.335 21.20E 415.49 473.795 28.21E 473.37 2399 2275.93 2210.03 2495 2345.10 2279.20 2590 2411.17 2345.27 2685 2475.68 2409.78 2781 2538.75 2472.85 42 43 S 8.36 E 4.80 44 30 S 8.16 E 1.87 47 1 S 8.22 E 2.67 47 58 S 8.27 E .99 49 29 S 7.92 E 1.61 534.925 36.59E 535.07 600.135 46.05E 600.97 667.295 55.72E 668.81 736.975 65.82E 739.21 808.125 75.93E 811.07 2876 2599.02 2533.12 2972 2655.37 2589.47 3067 2708.85 2642.95 3162 2759.87 2693.97 3258 2807.42 2741.52 52 18 S 7.88 E 2.95 55 7 S 7.97 E 2.95 56 30 S 7.75 E 1.47 59 1 S 6.87 E 2.74 61 9 S 5.38 E 2.62 881.585 86.13E 885.24 957.605 96.71E 961.99 1035.595 107.48E 1040.72 1115.855 117.76E 1121.63 1198.035 126.57E 1204.26 ORIGINAL S~ IRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE PT/MPH-07 500292259700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/20/95 DATE OF SURVEY: 091495 ELECTRONIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-50083 KELLY BUSHING ELEV. = 65.90 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3353 2850.96 2785.06 3449 2888.66 2822.76 3544 2920.24 2854.34 3639 2945.84 2879.94 3735 2966.22 2900.32 64 41 68 43 72 31 76 22 79 3 S 6.35 E 3.80 1282.74S 135.28E S 7.13 E 4.30 1369.73S 145.57E S 7.74 E 4.03 1458.77S 157.20E S 9.19 E 4.29 1549.72S 170.74E S 9.84 E 2.88 1641.98S 186.21E 1289.38 1376.96 1466.76 1558.70 1652.20 3831 2985.94 2920.04 3926 3006.78 2940.88 4022 3028.28 2962.38 4117 3052.20 2986.30 4213 3077.23 3011.33 77 7 77 41 76 17 74 43 74 52 S 8.94 E 2.22 1734.21S 201.47E S 8.65 E .67 1826.36S 215.72E S 8.35 E 1.50 1918.40S 229.48E S 8.56 E 1.65 2009.94S 243.09E S 8.87 E .35 2101.05S 257.05E 1745.63 1838.85 1931.90 2024.44 2116.59 4309 3102.54 3036.64 74 24 4404 3127.18 3061.28 75 40 4499 3149.51 3083.61 77 16 4595 3171.84 3105.94 75 40 4691 3194.67 3128.77 76 43 S 6.64 E 2.31 2192.32S 269.48E S 7.54 E 1.62 2283.81S 280.87E S 8.55 E 1.96 2375.76S 293.86E S 8.54 E 1.68 2467.51S 307.65E S 8.63 E 1.10 2559.37S 321.52E 2208.71 2300.91 2393.76 2486.53 2579.42 4786 3216.07 3150.18 77 13 4881 3238.18 3172.28 75 59 4977 3261.18 3195.28 76 13 5072 3282.76 3216.86 77 37 5168 3305.54 3239.64 74 46 S 7.89 E .92 2650.91S 334.81E S 8.91 E 1.66 2742.75S 348.37E S 9.54 E .69 2834.53S 363.27E S 9.11 E 1.53 2926.25S 378.33E S 6.97 E 3.69 3018.13S 391.32E 2671.91 2764.74 2857.68 2950.59 3043.38 5263 3329.70 3263.80 75 44 5357 3353.23 3287.33 75 27 5453 3376.62 3310.72 76 15 5548 3400.51 3334.61 74 27 5643 3424.37 3358.47 76 31 S 7.33 E 1.08 3109.24S 402.75E S 7.11 E .37 3200.16S 414.27E S 7.34 E .86 3292.22S 425.94E S 6.98 E 1.93 3382.93S 437.34E S 6.60 E 2.21 3474.53S 448.24E 3135.20 3226.84 3319.64 3411.05 3503.29 5738 3446.98 3381.08 5833 3471.29 3405.39 5928 3496.18 3430.28 6024 3520.31 3454.41 6120 3544.23 3478.33 76 3 74 19 75 19 75 28 75 30 S 6.73 E .52 3566.57S 459.00E S 7.02 E 1.83 3657.84S 470.00E S 6.72 E 1.08 3748.96S 480.98E S 6.36 E .40 3840.97S 491.53E S 6.13 E .24 3932.80S 501.58E 3595.95 3687.88 3779.65 3872.24 3964.60 6215 3566.78 3500.88 6310 3589.28 3523.38 6404 3613.02 3547.12 6499 3635.65 3569.75 6595 3658.79 3592.89 77 9 75 19 75 41 76 45 75 15 S 5.93 E 1.74 4024.98S 511.31E S 4.67 E 2.33 4116.40S 519.80E S 4.48 E .45 4208.00S 527.13E S 6.80 E 2.62 4299.82S 536.20E S 8.14 E 2.07 4391.89S 548.27E 4057.25 4149.00 4240.76 4332.98 4425.84 tRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE PT/MPH-07 500292259700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/20/95 DATE OF SURVEY: 091495 ELECTRONIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-50083 KELLY BUSHING ELEV. = 65.90 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES DG/100 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERT. SECT. 6690 3682.45 3616.55 76 0 S 7.26 E 1.18 4483.37S 560.63E 6785 3706.25 3640.35 74 48 S 7.19 E 1.27 4574.03S 572.13E 6880 3731.67 3665.77 74 16 S 7.07 E .57 4665.19S 583.53E 6976 3757.14 3691.24 74 45 S 9.47 E 2.48 4756.17S 596.76E 7071 3782.42 3716.52 74 28 S 8.59 E .94 4846.89S 611.18E 4518.15 4609.53 4701.40 4793.33 4885.16 7167 3807.91 3742.01 74 40 S 8.36 E .31 4938.25S 624.79E 7262 3831.81 3765.91 76 24 S 9.54 E 2.17 5029.75S 639.20E 7358 3854.34 3788.44 76 21 S 9.37 E .18 5121.45S 654.47E 7452 3876.49 3810.59 76 25 S 9.00 E .39 5211.83S 669.09E 7547 3898.01 3832.11 77 16 S 9.22 E .93 5302.82S 683.68E 4977.51 5070.12 5163.03 5254.55 5346.67 7643 3919.94 3854.04 76 12 S 8.48 E 1.35 5394.80S 698.00E 7738 3943.67 3877.77 74 56 S 7.49 E 1.66 5486.19S 710.82E 7833 3968.57 3902.67 74 52 S 7.29 E .22 5577.76S 722.70E 7929 3990.87 3924.97 78 8 S 8.31 E 3.57 5669.84S 735.32E 8022 4009.05 3943.15 79 16 S 7.67 E 1.39 5759.96S 747.97E 5439.73 5532.02 5624.35 5717.29 5808.29 8115 4028.13 3962.23 77 7 S 8.17 E 2.36 5850.40S 760.55E 8209 4050.86 3984.96 74 58 S 8.45 E 2.29 5940.92S 773.77E 8304 4074.97 4009.07 75 28 S 8.79 E .63 6031.32S 787.47E 8398 4098.29 4032.39 75 44 S 8.75 E .28 6121.18S 801.33E 8492 4120.79 4054.89 76 37 S 8.49 E .97 6211.60S 815.04E 5899.60 5991.07 6082.49 6173.40 6264.83 8588 4144.34 4078.44 74 48 S 9.16 E 2.01 6303.00S 829.23E 8682 4170.32 4104.42 73 19 S 9.51 E 1.61 6392.77S 843.99E 8777 4197.15 4131.25 73 54 S 9.23 E .67 6482.80S 858.84E 8872 4223.44 4157.54 73 54 S 8.57 E .67 6572.81S 872.94E 8967 4250.82 4184.92 72 34 S 9.37 E 1.63 6662.59S 887.11E 6357.31 6448.24 6539.44 6630.53 6721.39 9031 4269.64 4203.74 73 13 S 6.96 E 3.74 6723.13S 895.79E 9126 4297.08 4231.18 73 0 S 7.42 E .52 6812.84S 907.11E 9240 4330.39 4264.49 73 0 S 7.42 E .02 6920.95S 921.19E 6782.54 6872.97 6981.99 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 6981.99 FEET AT SOUTH 7 DEG. 34 MIN. EAST AT MD = 9240 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 172.42 DEG. INTERPOLATED DEPTH AT 9240' S~.RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 BP EXPLORATION (ALASKA) INC MILNE PT/MPH-07 500292259700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/20/95 DATE OF SURVEY: 091495 JOB NUMBER: AK-EI-50083 KELLY BUSHING ELEV. = 65.90 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -65.90 .00 N .00 E .00 1000 999.27 933.37 20.92 S 6.14 W .73 2000 1950.54 1884.64 305.70 S 9.05 E 49.46 3000 2671.36 2605.46 980.31 S 99.89 E 328.64 4000 3022.98 2957.08 1896.90 S 226.32 E 977.02 .73 48.72 279.19 648.38 5000 3266.59 3200.69 2856.31 S 366.93 E 1733.41 6000 3514.14 3448.24 3817.28 S 488.89 E 2485.86 7000 3763.42 3697.52 4778.89 S 600.55 E 3236.58 8000 4004.89 3938.99 5738.18 S 745.03 E 3995.11 9000 4260.55 4194.65 6693.19 S 892.13 E 4739.45 756.39 752.45 750.72 758.53 744.34 9240 4330.39 4264.49 6920.95 S 921.19 E 4909.61 170.16 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. 'IRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE PT/MPH-07 500292259700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/20/95 DATE OF SURVEY: 091495 JOB NUMBER: AK-EI-50083 KELLY BUSHING ELEV. = 65.90 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -65.90 .00 N .00 E .00 65 65.90 .00 .02 N .00 E .00 165 165.90 100.00 .30 N .07 E .00 265 265.90 200.00 .64 N .26 E .00 365 365.90 300.00 .97 N .57 E .00 .00 .00 .00 .00 465 465.90 400.00 1.16 N .85 E .00 565 565.90 500.00 .60 N .68 E .01 665 665.90 600.00 1.44 S .58 W .04 766 765.90 700.00 5.05 S 2.53 W .13 866 865.90 800.00 10.29 S 4.09 W .28 .0O .00 .03 .09 .15 966 965.90 900.00 17.82 S 5.73 W .59 1067 1065.90 1000.00 28.30 S 6.81 W 1.15 1167 1165.90 1100.00 41.00 S 7.81 W 1.96 1269 1265.90 1200.00 57.21 S 8.03 W 3.29 1371 1365.90 1300.00 80.71 S 6.60 W 6.06 .31 .56 .81 1.33 2.77 1475 1465.90 1400.00 109.13 S 3.69 W 10.07 1580 1565.90 1500.00 140.84 S .57 W 15.03 1687 1665.90 1600.00 177.00 S 1.73 E 21.40 1795 1765.90 1700.00 217.76 S 2.61 E 29.41 1905 1865.90 1800.00 262.82 S 5.77 E 39.15 4.01 4.96 6.37 8.01 9.74 2017 1965.90 1900.00 314.11 S 9.80 E 51.62 2134 2065.90 2000.00 375.14 S 16.37 E 68.99 2257 2165.90 2100.00 445.10 S 24.64 E 91.34 2386 2265.90 2200.00 525.91 S 35.28 E 120.40 2524 2365.90 2300.00 620.36 S 48.95 E 158.66 12.48 17.37 22.34 29.06 38.26 2671 2465.90 2400.00 726.23 S 64.26 E 205.11 2823 2565.90 2500.00 840.32 S 80.41 E 257.70 2990 2665.90 2600.00 972.56 S 98.80 E 324.56 3174 2765.90 2700.00 1125.82 S 118.96 E 408.71 3389 2865.90 2800.00 1315.34 S 139.00 E 524.09 46.45 52.59 66.86 84.15 115.38 3734 2965.90 2900.00 1640.45 S 185.95 E 768.26 4170 3065.90 3000.00 2059.64 S 250.60 E 1104.16 4571 3165.90 3100.00 2444.52 S 304.20 E 1405.52 4997 3265.90 3200.00 2853.54 S 366.47 E 1731.20 5408 3365.90 3300.00 3248.96 S 420.38 E 2042.71 244.17 335.90 301.37 325.68 311.51 RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE PT/MPH-07 500292259700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/20/95 DATE OF SURVEY: 091495 JOB NUMBER: AK-EI-50083 KELLY BUSHING ELEV. = 65.90 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 5813 3465.90 3400.00 3638.78 S 467.65 E 2347.97 6211 3565.90 3500.00 4021.13 S 510.91 E 2645.58 6623 3665.90 3600.00 4418.63 S 552.09 E 2957.68 7009 3765.90 3700.00 4787.88 S 602.05 E 3243.55 7407 3865.90 3800.00 5168.51 S 662.20 E 3541.73 305.26 297.61 312.09 285.87 298.18 7823 3965.90 3900.00 5567.98 S 721.45 E 3857.85 8268 4065.90 4000.00 5996.73 S 782.12 E 4202.44 8667 4165.90 4100.00 6378.23 S 841.55 E 4501.34 9018 4265.90 4200.00 6710.82 S 894.29 E 4752.65 9240 4330.39 4264.49 6920.95 S 921.19 E 4909.61 316.12 344.60 298.90 251.31 156.96 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS ************************************************ *************************************************** ****:******* SL~:VEY PROGRAM *********** COMPANY BF.' WELL NAME LO~TION I MII2~E POINT LOCATION 2 ALASEA ~E4GNETIC DECLINATi~4 GRID CO~NVERGENCE ANGLE 0,00 DAT~.: 08-SEP-~5 WELL .~.~.~BER O M'I 50-027-~41-00 W~LL HE~ L~ATI~: ~T(N/-S) ~ILL AZi~TH FROM ROTARY TABLE 0,00 ' OEP(E/-W) 0,00 172,43 TIE IN POiNT(TIP) : M~S~:D~ DEPTH 112.00 TRUE V~T D~q~-I 112,00 INCLINATION 0,00 AZIMUTH 0,00 LATITLE)E(N/-S) 0,6~3 DE~'ARi~]RE (~-W) 0,00 ORIGINAL .SUM,~'f C~LOJLATIG}IS ' **~***~**** CIRCULAR ARC MEASt~R. ED INTER~,~L VERTICAL D~F'TH ft ft ft ~71, ~5 59.1 ~7t. ~6,26 85.1 256.26 346,30 ~0,0 346 437,~ 91,4 437 TARGET .STATION AZIMUTH LATITUDE s~r~Tn~ INCI~, N/-S ft deg d_~ ft 0.00 O,CE~ 0.00 0,00 0,~) 0,18 83,~.5 O,Ol -0,03 0,31 72,41 0,0? A~ -0,16 0,31 .~,~ 0,28 -0,28 0,32 72,?7 0,47 DEF'AB~URE DISF'LACEMENT at AZIMUTH E/-W ft it Oeo 0,09 0,09 83.26 0,45 0,46 7~,16 0,8? 0,73 72.65 1,~ 1,43 70,77 DLS Oe9/ 100~t 0,00 0,31 0,15 0,06 0,06 527.31 87.6 5~.31 617,71 90.6 617,87 708.44 90,5 708~37 7??,54 91,1 799.38 88?,08 87.5 888,74 -0.08 0,33 190,18 0,~ 1,~ 1.58 79,41 0.61 1,08 1.34 203,11 -0,74 1,07 1,44 130,9~ 1,14 3,66 2,37 199.21 -3.66 0,05 3.66 177.17 1,14 7.52 2,98 195,20 -7,75 -!.i? 7,84 165,71 0.70 !2.62 4.04 173,34 -13.06 -2,53 !3.31 I70,94 1,17 977.14 1075,26 1170,75 1267.07 1361.16 90,1 978,4? 96,1 1074,07 95,5 1168,77 96,3 1263,80 94,1 1355,56 19,80 5,48 183,34 -20.44 -3,51 20,74 189.74 1,83 29.88 6.75 18!.&7 -30,67 -3.76 30.73 !87.36 1,34 42,03 8,04. 150 ,~.°¢ -42,96 -4.17 43,i6 : = ~,57 10,64 176,77 -58,~ -3,72 58.69 123.5 2,75 qn .. 4.07 78,~o 14,~ 172,28 -77.18 -1,M 79.20 161.20 1456,37 1552,64 1647,~ 1742,64 1838,20 95,2 96,2 1538,85 94,? 1628,36 ~,1 1716.?I 75,6 1804,51 104,20 16,77 170,72 -104,63 2,15 i04,~5 178,83 1~,5i 18,71 172,37 -1~:.83 6.3? 133.?? 177.Z7 -1~.~,1¥ ?.?A 165.49 176,55 165,06 20.15 t74,56 ~ " . 1/,,~ -19e,68 13.35 ZO0,~ i??.70 22.~ -' ~q · ~ 176.1~ 237,61 24,45 1~.~ -~7,~ 16,84 23&.26 175,75 2,07 1.70 2,5? 1,77 ~)21.80 2120.39 2217,22 2314,20 98,8 2134,42 95,0 2210.16 277,63 26,13 174,42 -277,35 20.45 276,11 175,75 1,84 o1~,~ 175,51 3,34 319,47 29,09 173,10 -318.95 25,02 ~" '~ 370,70 .~,56 172.71 -369,8! 31.27 371.13 175.17 4,54 426.82 ~,67 170.02 -425,31 39,62 427.15 174.68 2.71 484,04 38.53 169.44 -481,67 47,66 484,~. 174.~ 3,03 2408,51 2504,61 ~6~O,v~ 26%,79 ~790,61 94,3 2261,66 96,1 95,4 2417,28 95,~ 2481,67 94,~ 2543.86 .jr 173,52 4,Al 545,41 42,84 168,5~ -~ n~ 61,59 545 ~r ~11.~. 44,75 I68.62 -~7.21 74,73 611,7'? 172.96 1,97 680,26 47,26 168,'~q -674,54 88,04 660,26 172,56 2,64 751,03 48,24 16~,32 -744,16 101.~ 751.04 172,24 1,04 822.52 49,78 169,7~ -~14,54 114,41 822,~ 172.00 1,65 2884,78 2'~8Q,91 3076,09 3171,2! ~ "7 94,2 2602.96 96.t 2659.64 95,2 ~ ~ A' 95.i 2.762.98 96,0 2810+64 8~5,74 52,47 169,66 -8.A5,66 973,3i 55,26 171,(~ -%3.20 1052,31 56.~ 170.74 -1041.23 11~03 59,18 171,67 -l12i,0Z 1216.36 61,~' 172.16 -1203.52 127.53 895,79 17!,62 140.50 ?73,39 171,70 152.78 1052.41 171.64 165.32 1133,14 ~71,$1 177,04 1216,47 171,&.~. 2,85 3,15 1,84 ~.45 2,24 3359 3552,32 3645,31 3742,96 ?l.& 2852.46 97,8 95.5 2q23,26 93,0 2948,4? 97,6 2969.67 1298,07 64,52 172,67 -12~4,54 1387,81 .~+57 172,32 -1373,50 t~ ~A 72,41 171,04 1567,23 76,10 lv~.79., · . -1~50.9e- . .. 1~62,52 78,~5 170,38 -1645.15 187,61 1298,20 171,66 3,56 197,52 1387.?! 17i,73 4,16 212,55 1477.67 171,73 4,21 225.?0 1557 ~ .~j !71.71 4,04 240,68 1662,65 171,68 3,15 3 ***-.-~******* ANADRILL ***.*********** SURV~'f CALC4]iATIO~ ulRCUI~ ARC ~OD*******.* ~PH-07 . MEA,.~E~ INTERVAL U~glCAL ft ft ft 3838,31 95,4 2989,40 3934,33 96,0 3010,3,9, 4029,10 94,6 3031,71 4124,61 95,5 30b-~,~ 4220,19 95,6 ~80,57 TARGET 9TATIOH AZIMUTH LATITUDE DEPARTL~:E DISPLACE~B4T at SECTION INCLN, N/-S E/-W ft deq deg ft ft ft 1755.76 77,27 !71.10 -1737,22 ~5.69 17~,93 1,9,49,45 77,4.9. 172,25 -1829,92 269.26 1849,63 1941,79 76,51 171,59 -1921,35 2.9.2,24 1941,97 2034,31 74,83 171.96 -2012,93 ~5,48 2034.50 2126,5t 74,56 172,~ -2!04,32 307.64 2126,69 AZIMUTH dca 171,63 171,63 171,64 171,65 171,68 Eeq/ lOOft 1,81 1,i? 1,22 1,81 0,97 4313,37 4409,3.9. 4504,~. 4601,46 469.9.,66. 93.2 3105.37 96,0 3130,-~ 95,2 3152,24 96.9 3174.78 97,2 3197.,9,9 2216,2~ 74,56. 172,70 -21'F3.42 318.90 2~16,48 2209.11 75.7! 172,91 -2285,49 ~0,52 2309,27 2401,65 77,~ 172,1! -2277,24 342,58 2401.80 24~,90 75,83 170,95 -2470,47 ~6,46 2496,06 2590.27 76,66 171,32 -2563.74 371.01 2590.45 171,73 171,77 171,,9,0 171,79 171.77 0,19 1,83 1,89 0.93 4792,.~ 50~.03 5120,50 8,9,4 3,,-,:.Y...7 47.0 3251.13 96,0 3274,40 95,5 .~97,60 2661,85 77.21 172,~0 -2654.~ 2768.~ 76.22 171,0! -2740,46 27~.47 2614,39 75.~ 170,81 _ o~ 2~07.46 76.39 170.67 -2877,35 3r~0,05 75,48 !72.15 -~68,92 364,06 2682,03 171,77 ~6,68 2769.02 171.76 403,8.9. 2,9,14,59 171,75 41,9,,8~ 2?07,..~J 171,72 432,68 3000.28 171,71 1.17 1,78 1.50 .~ u ,.9.7 1,7,9, 5215,56 5310,05 5406,16 5501,35 5597,17 95,1 3321,~. 94.5 2245..9.6 96,1 3369,83 95.2 22.94,35 95,.9. 3419.53 3091,96 74.95 172.46 -3060.01 3183.35 75,63 172,65 -3193.63 3276.42 75,48 172,14 -3242,88 32~,39 74,&$ 172,37 -3224,01 3460..9.5 74,88 172,99 -3425,72 444,96 3092,19 171,73 456,B2 3183,57 171,75 469,15 ~z76,64 171,77 481,54 336,9,,61 171,78 493.32 3461,05 171,81 0,64 0,75 0,54 0,67 57.9.7,0.9. 5.9..9.2,2.9. 5975,39 607!,15 91.5 3442,96 9.9.,4 3468,39 95,2 3492.66 92,1 3517,,9,2 95,8 2542,03 _ _ ~4Y,~1 ~ -.o ~..~,~ 503.99 ~ ' ~ o~49,J~ 75,4~ 17~,16 _~l~ ~,~ 3644,'36 74,59 172,89 -3607.89 515,53 3644.53 3726.,t3 74,62 173,22 -36~9,'~ 526,54 3736.29 3826.04 75.30 173,46 -3786,33 536,88 3826,18 3918.67 75.42 173,41 --?~_90,37 547.48 3918.60 17!,64 171.'9'7 171,90 171,93 171.97 0,65 0,91 0.44 0.74 0,14 61~.8.53 62,~,.36 6~7,94 6546,~ 97,4 3565,97 94.8 3589,0I 94.6 3612,55 93.6 ,'3635,49 95.3 3658,83 4013,02 76,i2 174,,9,4 -3974,26 557,14 4013,13 4104,93 75,75 174,91 -4065.89 565,36 4105.01 4196,41 75.42 175,79 -4157.18 572.7.9. 4196,46 4287.07 76.21 174.45 -4247.61 560,51 42,9,7,10 4379,41 75,43 173,06 -4~9,43 590,56 4379,43 172,02 !72.08 172,16 172,22 172,25 1,60 0.40 0,97 1,63 1,.A3 6642,14 6738,05, ~J31.76 6Wy3,65 7023.24 95.3:3682.70 95.9 3706,85 93.7 3731.17 95.9 J75,. "75,6 ~' "~ ,.,/Bi.,-9. 4471,66 75,56 172,~ -4430,96 45E&,50 75,27 173,01 -4523,02 4654,99 74.65 173,~?~ -4612,~ 4747.45 74,62 171,0,9, -4704,43 48Q9,60 74.56 171.69 -4795.58 602,27 4471,70 172,26 . 614,09 4564,52 172,27 625,04 4655,01 172.26 637.76 4747,46 172.28 65!,41 4839.62 172,26 0,73 0,72 0.67 2,02 0,81 7116,24 7215.01 7310.96 7406.22 7500.36 92,0 3806,80 9.9.,.9. ~32,16 95,9 3,9,55,51 95,3 .38-7.9..34 94,1 4?29,22 74,4.9. 171,97 -4884,31 5024,67 75,77 172,~ -4978,88 5117,73 76,C~. 173,89 -5071,28 5210.20 76.20 171.,9,2 -5163.03 5301,60 76,13 I71,47 -5253,47 664,00 4929.24 172,26 6,'r'/,O0 5024,70 172,26 66,9,,13 5117,75 172,27 699,62 5210.22 172.2B 712,90 5~1.62 172,27 0,12 1.37 1.56 2,11 0.37 ., 4 -. MF'H-07 ***~****.**** At, DRILL SURgFf CALCL&ATIONS *****.*******.* CIRCUkAR AF,~ MEASL$:ED I~-~RV~L VERTICAL D~%H ft ft 7691,51 96~1 3~5,33 77&5,22 94,7 3970,1~ 7881,.53 95,4 ~94,09 7~77,67 %,0 4015,01 TARG~ STATION AZIMU?H LATITUDE SB~TION INCLN, N/-S ft ~eg deq ft 5394.15 77,48 171,45 -5345,01 5467,47 75,10 171,7 -5437,34 5578,86 74,48 172,65 -5527.89 5671.22 76,48 172,57 -5619,48 5764.95 78.3 172.46 -5712,4! O£PAEq~]R£ MSPLACEMB~ at ft ft 726,65 5~4,17 740,27. 5467,50 752,&5 5578,89 764.53 5671.25 776,74 5764.98 AZIMU?H deo 172,26 172,25 172,25 172,25 172,26 DLS lOOft 1.43 2,50 1,11 2,10 1,95 8070,48 ol,.0, 8257,43 8~53.04 8446,74 ?2,8 4034,49 90,3 4055,~ 96,6 4079,75 95,6 4104,25 93.7 41U,69 5855,69 77,41 172,31 -5802,35 786,76 58~,71 ~4~,o7 75,84 172,01 -5889,41 800.75 5943.60 6037,06 74,96 172,10 -5982,~ 813,67 6037.09 6129.47 7: . · ~,34 172,01 -6073,53 826,45 Al~,50 622~.20 75,70 172,26 -6163,40 838,86 6220,23 172,26 ,-, ,,..o / 17~.~... 172,25 172,25 172,25 1,02 1.78 0.91 0.40 0.46 8541,05 8635,36 8625.17 8~0,22 94,3 4151,27 94,3 4176,26 95,I 4~3,08 ?4,7 42~,59 95,1 4?_%5,44 ~81!,51 75,35 171,39 -62_53,79 6402,43 73,92 171,51 -6343,72 6493,67 73,31 171,50 -.~33,96 6584,57 74.18 i71,69 -6523,90 A ~ ~.75.75 73,01 172,54 -.614,~2 851,84 6311,54 !72.24 0.97 865,36 .4402,47 172.23 1,52 878,84 6493.71 172,~ 0.64 892,13 6584,61 172,21 0.93 904,64 6675,79 172,21 1,49 90t5,19 9111,13 9153,43 9274,22 9568,56 95.0 4284.,40 95,9 43i2,67 42,3 43?_5,02 120,8 43~3,10 94,3 4387.18 6785,51 72,74 172,10 -67~,16 6858,18 72,98 172,73 -6795,03 6898,64 73,07 171,[6_ %625,10 7014,21 73,17 174,55 -6949,80 7104.54 73,47 173,~ -7039,68 916,77 6766,55 172.21 928,87 6658,23 172,22 934,48 6898,69 172,21 948.67 7014,2_5 172,~ 956,08 7104,57 172,25 0,52 0.67 3,13 2.54 1.11 9464,47 9559,83 9654.63 9750.63 9646,30 95,9 4414.~ 95.4 4440,57 94.8 4466.[*0 96.0 449!,75 95,7 4516,41 7196,55 73,77 171,91 -7130,94 7~&~ ~ 74,~7 169.~4 -7221,43 7379,36 74.22 171,52 -7311,47 7471.91 74,?2 171.57 -7~3.02 7564,3~ 75,22 171,22 -7494,42 969,77 .1~..,58 172,26 984,31 7288,21 !72,24 '~9,08 7379.41 172,22 1012,69 7471,96 172,21 1026,52 7564.~ 172.~ 1.63 2,13 1.72 0.61 0,47 100~6.!1 10131,36 10226.22 10322,58 96,3 4541,02 93.5 4565,47 95,3 4591,38 94,9 4617.43 ?6,4 4643,74 7657.36 75,16 169,87 -7546,23 /'747,52 74.53 169,~ ~ -7675,03 7~,09 73,91 170,~ -7765,21 79~J),20 74,21 169,56 -7854,98 8022.~ 74,09 171,22 -7946,~ 1041,81 7657,43 172.1~ 1058.07 7747,62 172,15 1074,48 78~,20 172,12 1090,66 7930,34 172,10 1106,05 6022,99 172.08 1.36 0,64 0.91 0,55 1.77 10417,4? 10514,60 10608,35 10703,76 10798,78 94,9 4&69,76 97,1 46.96,28 ~,8 4721,46 95,4 4746,6~ 95,0 4771,84 8114,08 74,09 170,36 -8036,50 8207,-48 74,21 172,80 -8128,?0 8~7.78 74.62 172,95 -8218,51 8389,79 74,7! 171,64 -8~9,71 8481,41 74,59 174,16 -8400,65 1120,58 8114,24 172,06 1134,26 8207.65 172,06 1145,47 825'7,95_. 172,07 1157,64 ~89,96 172,07 1!68,80 ._q~61.57 172,08 0,98 2.42 0.47 !.12 2,36 10894,79 10988,50 11084.01 11179.~ 11275,19 96,0 4797,17 93.7 4821,69 95,5 4846,72 95,9 4872,%' 95,3 4900,27 8573,W¢ 74.81 173.16 -8492,69 8664,43 74,86 172,63 -8582,43 8756.61 74,~ 172,81 -8673.87 8~ ~ 73,44 172,85 -8765,39 8940,13 73,29 172,28 -8855,?1 1179.03 8574.14 172.10 1190,21 .56.54,57 17£,10 1201,89 8756,74 172,11 1213,40 8848,98 172,12 1225,21 8940,26 172,12 1.04 0,20 1,39 0.60 .~. 5 _.MPH-07 ~***.****** ANADRILL ************** SL~'~ CAI~TIONS *********m,.** CIECbZAR ARC M~it~OD.******** MEASL~ INTBRVAI. V~ICAL D~F~H D£PTH 11369,27 94,1 4~7,81 11465.37 96,~ 4~6,49 11~9,?~ 94,5 49~4,77 116~,13 95,2 5013,~ 11749,25 94,1 5040,79 TARGET ~ATI~ AZIMUTH LATI~DE S~TIGq INCLN, ~-S ft deg deg. ft 9030,0? 72,~ 172,~ -8945,08 9121.60 72,60 171,44 -~0~,90 921!.99 72,59 170.91 -9125,04 9302.~ 72.49 171.35 '-92!4.79 9392.76 73,34 172,i6 -9303,63 DEPARTL~E DISPI~C~MB4T at E/-W ft ft 1237.08 9030,21 1249.84 9121,93 1263,68 '~12,13 1277,69 9302,?5. 1290,59 9392,91 AZI~JTH DLS deg/ d~ lOOft 172.13 0,73 172,i2 1,12 172,12 0,53 172,11 0,46 172,10 1,22 11846,43 11940,50 12031,95 12125,22 12221,22 97,2 5068,98 94,1 5096,31 91,5 5121,57. 93,3 5145,61 96,0 5170,84 9485,82 73,17 172,96 9575,83 73,05 172,48 -9485,36 9663,71 '74.90 174,33 -~72,70 9753,74 74,97 173,47 -9~42.25 9846.39 74.~1 174.15 1302,64 9485.97 .~14,0~ 9575,97 1324,14 lo~3,71 ?753,86 1343.71 172,11 0,81 172,11 0,51 172,12 2,81 172,14 0,90 172,16 0,71 1~14,79 12416,~. I~12,45 12543,97 12609.83 12710,~ 12804,?7 12898.63 13001,50 13092,44 93.6 5195,55 102.1 5222,85 95.6 5248,44 31.5 65.? 5~74,48 100,5 5301,67 93.7 5353,51 102,? 5382,51 9%5,61 74,56 173,~ -9844.11 10034,95 74,41 173,41 -?~41 10127,04 74,53 17~.~4 -10033,21 t0157,41 74,~ 174,14 -lO(k~3,49 10220.83 74,39 174.2~ -10126,61 10317.55 74.22 173,32 -10222,78 10408,5? 74,08 172,47 -10313,13 10498,57 73,70 173,61 -10402,45 10597,25 73,56 173,59 -10500,53 10~4,44 73.43 172,07 -10587,04 1353.43 9936,71 1364,65 10035,04 1375,36 10127,12 1376,70 10157.49 1385.15 10220,90 1395.66 10317.61 1406,92 10406.66 1417,83 10496..~J 1428,63 10597,30 1439,72 10E~4,49 172,17 0,74 172,18 0,16 172,19 0,21 172,20 2,75 172.21 0,25 172,23 0,85 172,23 0,88 172,24 1.24 172,2_5 0,14 172,26 1,61 13171,60 I3264,14 1~58,47 13450,6? 13543.70 79,2 5430,'T.'.'.'J 92,5 5457,3~ 94,3 54-~5,25 92,2 5515,36 93.0 5549,71 10760,30 73,40 172,.~ -10662,~ 10849,00 73.46 17i,84 -10750,12 10939,09 72,09 171,26 -10639,24 11026,24 69.~ 17t,80 -10925,44 11112.66 66,85 173,11 -11011.12 1449,82 10760.35 1461,81 10849.05 1475,05 10939,14 1487,89 11026,29 1499,25 11112.72 172,26 0,68 172,26 0,82 172,25 1,57 172,24 2,55 172,25 3,42 13637,97 13733,09 13B28,25 13923,45 14025,46. ?4,3 5587,20 95,1 ~626,50 f5,2 5..x66,34 95,2 5713,4! 102,0 5765.01 11199,15 .~,28 172,78 -11C~6,96 11285,76 64,90 171,9Q -1118.2,80 11371,22 62,92 171,90 -11267.40 11455,06 60,57 172,~ -11~0,43 11543,05 58,65 172.27 -11437.59 1509,67 111~7,20 1521,42 11285.82 1533,46 11371,27 1545,17 1557,19 11543,11 172,~ 0,68 172,25 172,25 2,09 172,25 2,47 172,25 1,89 14116,13 14213,00 14307,72 14402,18 14496,97 92,7 ~15,11 94.9 5869.71 94,7 5927,22 94,5 5966,78 94,6 ~047.06 11621,01 55,90 171,54 -115t4,76 11698,57 53.~2 171,27 -11591.49 11773,82 51,40 171,68- -!166.5,92 11847,13 50,42 172,13 -11736,52 11920,27 50.59 171,62 -11810,93 1568,16 11621,07 1579,75 11698.64 1590,79 11773,8? 1600,~ 11847.20 1611.33 11920.34 172,24 3,04 172,24 2,21 172.23 2,61 172,23 1,05 172,23 0,45 14592,40 14686,08 14779,65 .14871,36 149&5,23 95,4 93,7 6172,50 93,6 6238,~? 91,7 ..~4,92 94,9 6375,93 11~)2,63 48,40 173,13 -11882,85 12061,75 46,~ 171,85 -11951,17 12128,25 44,29 173,05 -12017,10 12191,27 ~.~ ~ 173,51 -12079,70 lZZ54,13 40.53 174.91 -12142,26 1620,98 1629.97 1636,72 1646,09 1652,45 11992.?0 172,23 2,59 12061,81 172,23 2.43 1212E.,32 !72,23 2,37 12191,34 172,24 1,94 12254,19 172,~--~. ?2,33 NO. 6 .... : '"PH-07 ************* ~D~ILL ~I£A$!JR~ INT~'-.'AL t.m._.RTICAL T~%ET STATION AZIMb%H LATITUDE DEPARTIJR£ DI~'LACEMENT ~'c AZIMUTH DLS DEPTH D~Fq'H SE~ION INCLN. hl/-S' E./-W deo/ ft ft ft ft deg deg. ft ft it deg lOOft 15054,36 ~,1 6443,54 12310,63 39,29 174,64 -12198,58 1657,60 12310.68 172,26 1,42 15148,19 93,8 6516.34 12369,74 36,94 176,27 -12257,58 1662,29 12369,78 172,28 1,16 15243,85' 95,7 6590,70 12429,8? ~,08 174,73 -12317,63 1667,02 12429,92 172,27 1,02 15337,97 94,1 .'t663,63 12489,26 39,26 175,09 -12376,62 1672,28 12489,29 172,31 0,31 15431.51 92.5 6736.30 i2548.11 26.~ 174.66 -12435.49 1677.54 12548.13 172.22 0.58 1~27,22 '~,7 6811,05 12607,60 36,49 175,96 -12495,06 1682,43 12607,82 15622.23 95.0 6885.69 12666.49 37.96 17'5.22 -12553.67 1666.95 12666.51 15713,70 91,5 6~'58,19 I2722,17 37,18 176,41 -12~9.29 1691,02 12722,18 15~3.38 99,7' 7038.14 12781.58 36.17 175.65 -12~.,56.68 1695.14 12781.59 PF~JECTED TO ~ 15898,00 84.6 7106.45 12821.45 36,17 175,70 -12718,48 1698,90 12831,45 172,33 172,~ 0,73 172,36 1,16 172,~. 1,11 172,39 0,02 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11118 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) 6/30/97 Well Job # Log Description Date BL RF Sepia LIS Tape MPU B-14 L~.~ ('- ..... INJECTION PROFILE 970607 I 1 MPU E-07 ~.-,L \ ¢ INJECTION PROFILE 970606 I 1 MPU E-16 v- INJECTION PROFILE 970605 I 1 ~ MPU F-05 / PERFORATION RECORD 97051 7 1 1 M PU F-05 v' TEMP & PRESSURE SURVEY 97051 7 I 1 MPU F-05 ~ GR/CCLLOG 970517 I 1 MPU F-26 ~' GR/CCL LOG 970525 I 1 MPU F-26 ~,.-' STATIC PRESS &TEMP 970527 I 1 MPU F-26 ~ PERFORATION RECORD 970527 1 1 MPU F-50 ,~'' PERFORATION RECORD 970508 I 1 MPU F-50 .-'~' STATIC PRESSURE SURVEY 970509 I 1 MPU F-57 '~ PERFORATION RECORD 97051 2 I 1 MPU F-62 .." (jl~.l (.. INJECTION PROFILE 970608 1 1 MPU F-65 .~-" PERFORATION RECORD 97051 1 I 1 MPH -07 ~-' GR/CCL RECORD 970 42 4 1 1 MPH -07 ~-~ GPJCCL RECORD 97042 7 I I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 iI / GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10814 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) 2/21/97 Well Job # Log Description Date BL RF Sepia LIS Tape M PF-21 ULTRASONIC IMAGER 9701 04 I 1 MPF-21 GR-CCL CORRELATION 9 701 05 I 1 ....... MPF-21 CEMENT BOND LOG 9701 04 I 1 MPF-21 TDT GRAVEL PACK LOG 9701 08 1 1 MPF-21 9 5/8" PACKER RECORD 970105 I 1 MPU K-33 STATIC TEMPERATURE PRESSURE 9701 2 9 I 1 MPU K-33 BRIDGE PLUG SET 970207 I 1 MPU K-33 GR/CCL DEPTH LOG 9701 29 1 1 MPU F-54 GR/CCL DEPTH LOG 9701 31 I 1 M P H-07 GR/CCL CORRELATION LOG 9 701 21 I 1 M P K-06 PERFORATION RECORD 9701 1 2 I 1 MPK-06 GR-CCL PRIMARY DEPTH LOG 9701 1 2 I 1 MPE-17 CEMENT BOND LOG 9701 07 I 1 MPE-17 COMPLETION RECORD 9701 27 I I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 TO: Schlumberger - GeoQuest A Division of Schlumberger Technologies Corporation 500 W. International Airport Road Anchorage, Alaska 99518 - 1199 (907) 562-7669 (Bus.) (907) 563-3309 (Fax) August 29, 1996 BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 The following data of the Depth shifted CDR/CDN, CDR/CDN TVD'S for well MPH-07 Job # 95331 was sent to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 OH LIS Tape Bluelines each Film each Depth shift display State of Alaska Alaska Oil & Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Ddve Anchorage, Alaska 99501 1 OH LIS Tape 1 Blueline each 1 RF Sepia each OXY USA, Inc Attn: Darlene Fairly P.O. Box 50250 Midland, Texas 79710 1 OH LIS Tape 1 Blueline each 1 RF Sepia each Sent Certified Mail Z 777 937 464 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP EXPLORATION (ALASKA)INC. PETROTECHNICAL DATA CENTER, MB3-3 900 EAST BENSON BLVD. ANCHORAGE, ALASKA 99519-6612 Schlumberger Courier: SCHLUMBERGER GEOQUEST 500 WEST INTERNATIONAL AIRPORT ROAD ANCHORAGE, ALASKA 99518-1199 RECEIVED Date Delivered30 EP 0 5 ]995 Received By: Alaska Oil & Gas ms. ,.,umm~sion HOWARD OKLAND Attn..ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE A/K, 99501. Date: RE: 9 August 1996 Transmittal of Data ECC #: 6712.00 Sent by: HAND CARRY Data: ML-LDWG Dear Sir/Madam, Reference: BP MILNE POINT / SBP NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE+LIS Run # 1 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: ~~.~_~. Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 30 August 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: ×~"/ - : WELL .~ DESCRIPTION ECC No. H'07 (22-11'13) 1 LDWG TAPE Run i PDK FINAL L Run ·· Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: -- ~ RECEIVED SEP 4 ~Ua~a Oil & Gas C~,~s. OXY USA INC. Box 50250, Midland, TX 79710 September 7, 1995 ---CERTIFIED--- Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive ~_nchorage, Alaska 99501-3192 Attention: Mr. Bob Cranda!l t~'~-~- 907 27'u Reference: Application for Spacing Exception for Miine Point H-07 Well Dear Mr. Crandall- OXY USA Inc., an affected party, has no objection to the drilling of ~h~ Milne Point ~-07 well proposed in Joe Polya's memo to you dated September i, 1995. Should you have any questions, please give me a call at 915 685- 5673. Sincerely, Edward J. Behm, Jr. Asset Lead Heavy Oil Team EJB/esm An Occidental Oil and Gas company MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David ~n, DATE: ChairmaCf' September 8, 1995 THRU: Blair Wondzell, ~'~ FILE NO: P. I. Supervisor FROM: John Spaulding,~,.¢¢. SUBJECT: Petroleum Insp. EWOLHICD.doc Diverter Insp. Nabors 22E BPX MPU well MPH-07 Kuparuk River Field PTD # 95-142 Friday September 8, '1995: I traveled to BPX' Milne Point Unit, well MPH-07 to witness the Diver[er Function Test on Nabors rig 22E. The AOGCC Diverter Function Test Report is attached for reference. The pad area's at Milne Point are,-:_ quite small and therefore somewhat congested. The diverter vent line exits the rig very near the H-pad control room and chemical injection skid, neither the control room or chemical skid are manned continously. Both areas are explosion proof facilities. As shown on the attached drawings the vent lines travel next to the chemical skid and under the control room. I requested that the bifurcated section to the south be used as the main vent line and to close the line pointing to the west under the control room as there is an access road about 50' west of the control room. __ Summary: I witnessed the successful diverter function test on Nabors 22E. Attachments: EWOLHICD.XLS Drlg Contractor: Operator: Well Name: Location: Sec. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report Nabors BPX MPH-07 34 T. 13N. R. Operation: Rig No. Oper. Rep.: Rig Rep.: IOE. Development 22E PTD # X Exploratory: 95-142 Rig Ph. # Dave Mountjoy Leonard Schiller Merdian Umiat 659-4446 TEST DATA MISC. INSPECTIONS: Location Gen.: ok Housekeeping: ok Reserve Pit: na (Gen.) Well Sign: Drlg. Rig: Flare Pit: DIVERTER SYSTEM INSPECTION: Diverter Size: Divert Valve(s) Full Opening: Valve(s) Auto & Simultaneous: Vent Line(s) Size: Vent Line(s) Length: Line(s) Bifurcated: Line(s) Down Wind: Line(s) Anchored: Turns Targeted / Long Radius: 20 yes yes 10 gtO"+ 70x70 yes yes yes na ok ok aa in, in, ACCUMULATOR SYSTEM: Systems Pressure: Pressure After Closure: 200 psi Attained After Closure: Systems Pressure Attained: Nitrogen Bottles: 3000 1600 min. 35 2 min. 33 8 Bottles Average psig psig sec, sec, MUD SYSTEM INSPECTION: Trip Tank: Mud Pits: Flow Monitor: 2000 psig Light Alarm ok ok GAS DETECTORS: Methane Hydrogen Sulfide: ok ok ok ok Light Alarm ok ok ok ok DIVERTER SCHEMATIC Explosion proof chem. injection 70' M. Pits Motors New wells Existing wells Explosion proof control room North H-01 H-02 H-06 H-03 H-05 H-04 · · O · O · Pipe Shed Wind Direction IShop Distribution orig. - Well File c - Oper/Rep c - Database c - Trip Rpt File c - Inspector AOGCC REP.' OPERATOR REP.: John H. Spaulding Dave Mountjoy FI-022 EWOLIHCD.XLS Alaska oil and Gas Conserve .~001 Porcupine Drive Anchoraqe, Alaska 99~01-319 Mr. Bob Cran (FAX 907 276 A~lica~ion Milne Point Dear Mr. Crandall: OXY USA INC. 5'0250. M1cllcmcl, 1'~ 79710 Se~ember 7, z995 =ion Commission 2 -7542) for Spacin~ Exception for I I OXY USA Inc., an affected D~r~y, has no obJecnion to the drillih~ of the Milne Poin~ H-07 well proposed in Joe Poly~'s memo to you dated Sept~m_ber 1, 1995. Should you have any q%ze-~tidns, please give ~e a call at 915 685- ~673, Sincerely, Edward J. Behm, Jr. Asse~ Lead Heavy Oil Tea~ E~B / esm ",T 'd ,. / · ~hdJo# ~ OI.Llet,~ l~u, Jgl,~Jl xaj pule.iq .,ll-,lsod /INI0d '~N']IN NOIl~OqdX3 'd'~ N.~dI?:,,I.~, q6, d.O ARCO AK EXPL. ID:907-265-1::398 ARCO Alaska, Ina. Post Office B~ J0360 Anchorage Alaska 99510-0350 Telephone 907 278 1215 SEP O7'95 l~'bU No.UU1 K.U1 September 7, 1995 Mr. Bob Crandall Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Fax: (907) 276-7542 Subject: Non-objection letter in support of BP's intentionally deviated well application for the drilling of BP's Milne Point H-07 well ADL-25637 (ALK-2570) Dear Mr, Crandall: Arco Alaska, Inc. has no objection to the drilling of the Milne Point H-07 well as proposed in Joe Polya's memo to you dated September 1, 1995. Should you have any questions, please give me a call at (907) 265-6914. SJncercly~, ~R.'~Wine;~CPL / ce: ~6T~{~df~sky, BP ARCO Alet~ka, Ir~. I, m ~ubel~l~'y O/AflenlJe Rlehfl$1ct ~ompany ALASKA OIL AND GAS CONSERVATION COMMISSION / t t ! I / / / o, ! TONY KNOWLE$, GOVERNOt:t 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-14.33 FAX: (907) 276-7542 September 7, 1995 Randy Thomas, Ddg Supt BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Miine Point Unit MPH-07 · BP Exploration (Alaska), Inc.- -- - : - - Permit No 95-142 Surf Loc 2709'NSL, 4079'WEL, Sec. 34, T13N, R10E, UM Btmhole Loc 550'NSL, 2391'WEL, Sec. 11, T12N, R10E, UM Dear Mr. Thomas: Enclosed is the approved application for permit to ddil the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting ddlling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance With 20 AAC 25.035: Sufficient notice (approximately 24 hours) of the BOPE test performed before ddiling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be m field inspector 659-3607. . ,. . ' ":'David W. J~hnSton ~ '~- ' ~ BY ORDER OF T MMI$SION /encl c: Dept of Fish & Game, Habitat section - w/o encl Dept of Environmental Conservation - w/o enct STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work Drill [] Redrill I-Illb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil [] Re-Entry [] Deepenr-iI Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 66 feet Milne Point / Kuparuk River 3. Address 6. Property Designation P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 380109 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 2709' NSL, 4079' WEL, SEC. 34, T13N, RIOE Milne Point Unit At top of productive interval 8. Well number Number 828' NSL, 2428' WEL, SEC. 11, T12N, RIOE MPH-07 2S100302630-277 At total depth 9. Approximate spud date Amount 550' NSL, 2391' WEL, SEC. 11, T12N, RIOE 09/21/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 025637 550 feet No Close Approach feet 2560 15878' MD/6950' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 500 feet Maximum hole angle 75 o Maximum surface 2780 psig At total depth (TVD) 6950'/3440 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 24" 20" 91.1# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 12-1/4" 9-5/8" 40# L-80 Btrc 8692' 31' 31' 8723' 4266' 1565 sx PF '£', 777 sx Class 'G', 8-1/2" 7" 26# L-80 Btrc 15848' 30' 30' 15878' 7016 222 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor ~_ ;i,.. .,~. ; ~ E D Surface Intermediate SEP 06 1995 Production Liner Al~$k~ Oil & Gas Cons. Commission Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[] :21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed T itl e ~enie?Dri!!?.2 E~2~neer Date ~/'~'~j'- Commission Use Only Permit Number APl number Approval date See cover letter ,.,,,,,.,,,,~'~;O(*;~?~~.f!~,.,,,~,,~,~,,,.,, 50- O""Z..~ - '~ '~' ~ ~"~ ~_ '~,,2 ~" ¢,_~-- for other requirements Con u al Samples required [] Yes [] No Mud Icg required []Yes [] No Hydrogen sulfide measures [] Yes [] No Directional survey required [] Yes [] No Required working pressure for BOPE F-12M; 1-13M; ,I~SM; 1-110M; 1-115M; by order of ~?//~~. Other: 0riginat Signed By Commissioner [ne commission Date Approved by 13m~iri Form 10-401 Rev. 12-1- Submit i~ triplicate Well Name: ] MPH-07 Well Platt Summary Type of Well (producer or injector): [ Kupamk Producer [ Surface Location: Target Location: Bottom Hole Location: 2709 NSL 4079 WEL Sec 34 T13N R10E UM., AK. 0828 NSL 2428 WEL Sec 11 T12N R10E UM., AK. 0550 NSL 2391 WEL Sec 11 T12N R10E UM., AK. AFE Number: [ 330 i 79 [ Estimated Start Date: [ 9/21/95 [MD: 115878 [ [TYD: [ Well Design (conventional, slimhole, etc.): Rig: [ Nabors 22-E [ Operating days to complete: [ 16 [ 69S0' bkb [ [KBE: [ Milne Point Ultra Slimhole 7LS [66' Formation Markers: Formation Tops MD TVD (bkb) base permafrost 1846 1816 NA 7257 3886 Top of Schrader Bluff Sands (8.3 ppg) OB 8067 4096 (8.3 ppg) Seabee Shale 8145 4116 Base of Schrader Bluff Sands (8.3 ppg) HRZ ' 14763 6171 High Resistivity Zone Top Kup 15245 6531 Kuparuk Cap Rock Top C1 Sand--Target 15440 6681 Target Sand (9.9 ppg) Total Depth 15878 7016 Casing/Tubing Program: Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 24" 20" 91.1# H-40 Weld 80 32/32 112/112 12 1/4" 9 5/8" 40# L-80 btrc 8692 31/31 8723/4266 8 1/2" 7" 26# L-80 btrc 15848 30/30 15878/7016 Internal yield pressure of the 7" 26# casing is 7240 psi. Worst case surface pressure would occur with a full column of gas to the reservoir at 7000 TVDSS. Maximum anticipated surface pressure in this case assuming a reservoir pressure of 3440 psi is 2780 psi, well below the internal yield pressure rating of the 7" casing. Logging Program: Open Hole Logs: Surface Intermediate Final Cased Hole Logs: MWD Directional and CDR (Gr/Res) across Schrader Bluff N/A 1. PDC Bit f/Seabee to TD w/MWD Dir and LWD (GR/CDR/CDN). GR/CCL will be mn in 7" casing to Tie-in the TCP Guns for Completion. Mud loggers are not required for this well. gncho~'ago Mud Program: Special design considerations I None- SPUD MUD Surface Mud Properties: ] Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel · Loss 8.6 50 15 8 10 9 8 to to to to to to to 9.4 100 35 15 30 10 15 intermediate Mud Properties: N/A ] Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Production Mud Properties: ] None- LSND freshwater mud Density Marsh Yield 10 see 10 rain pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 40 10 3 7 8.5 6-8 to to to to to to to 10.4 50 15 10 20 9.5 4-6 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: Maxtmu[mKOP: [ 500' · Hole Angle: Close Approach Well: (No Shut Ins) Disposal: Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. The Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with request. Fluid Handling: All drilling and completion fluids can be annular injected. Approvals have been granted for MPH-05 and MPH-06 wells for annular pumping. Request to AOGCC for Annular Pumping Approval for MPH-06: 1. Approval is requested for Annular Pumping into the MPH-07 9-5/8" x 7" casing annulus. 2. Aquifers in the Milne Point Unit have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #2 as referenced in Area Injection Order #10. There are no domestic or industrial use water wells located within one mile of the project area. 3. The 9-5/8" casing shoe will be set at 8723' md (4266' tvd) which is below the Schrader Bluff Sands and into the Seabee formation which has a long established history of annular pumping at Milne Point. 4. The burst rating (80%) for the 9-5/8" 40g LB0 casing is 4600 psig while the collapse rating (80%) of the 7" 26# L80 casing is 4325 psig. The break down pressure of the Seabee formation is 13.5 ppg equivalent mud weight. The Maximum Allowable Surface Pressure while annular pumping is calculated according to the following equation and is 2425 psi for a 10.4 ppg fluid in this well (Assumes worst case in which 7" casing is filled with gas). MASP = 4325 psig - ((fluid density ppg - 1.9) X 0.052 X 9-5/8" Casing Shoe TVD 5. A determination has been made that the pumping operation will not endanger the integrity of the well being drilled by the submission of data to AOGCC on 7/24/95 which demonstrates the confining layers, porosity, and permeability of the injection zone. 6. The cement design for this well ensures that annular pumping into hydrocarbon zones will not occur. AREA WELL PREV VOL PERMITTED PERMITTED INJECTED VOL DATES (BBLS) (BBLS) Milne Point MPH-05 0 0 1995 Milne Point MPH-06 0 0 1995 Milne Point MPH-08 0 0 1995 DO NOT EXCEED 35,000 BBLS IN ANY ANNULUS. MPH-07 Proposed Summary of Operations , 2. 3. 4. 5. . . . 10. 11. 12. 13. 14. 15. Drilling Hazards and Risks: 1. 2. Drill and Set 20" Conductor. Weld a starting head and top job nipple on conductor. Prepare location for rig move. MIRU Nabors 22E drilling rig. NU and test 20" Diverter system. Build Spud Mud. Drill a 12-1/4" surface hole as per directional plan and run and cement 9-5/8" casing. Run only Dir MWD and LWD CDR (Gr/Res). ND 20" Diverter, NU and Test 13-5/8" BOPE. MU a on a PDC bit on a motor, with Directional MWD and LWD CDR/CDN (GR/RES/Dens/Neu). RIH, Drill out FE and 10' of new formation -- Perform LOT. Drill 8.5" hole to TD -- This hole section will be logged LWD with Triple Combo (GR/Res/Neu/Dens). Run and Cement 7" Casing. Freeze Protect Top 2000' of with diesel. ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well. MIRU Nabors 4ES. NU & Test BOPE to 5000 psig. RIH while PU 3-1/2" drill pipe and 7" 26# scraper and bit. RIH to PBTD, perform a casing wash while displacing the hole with 10.2 ppg brine. Filter brine water to 2 micron absolute. POOH & PU Drill Pipe Conveyed Perforating Guns. RIH and Set Packer. ROPE Perforate the well. Kill well while circulating 10.2 ppg kill weight brine. POOH laying down 3-1/2" Drill Pipe. Change Rams and run Electric Submersible Pump on 2-7/8" threaded tubing. Install Surface Lines and Wellhouse and put the well on production. Hydrates have been encountered while drilling the MPH-05 and MPH-06 wells. MPH-05 experieced major lost circulation in the surface hole while drilling at 3700' tvd -- this lost circulation caused the 9-5/8" surface casing to be set shallow. MPH-06 was drilled without incident. 3. Minor losses were experienced while drilling the MPH-01,2, and 3 wells. . .o Ancho.~age MPH-07 9-5/8" SURFACE CASING CEMENT PROGRAM - HALLIBURTON STAGE I CEMENT JOB across the Schrader Bluff Formation: CIRC. TEMP: SPACER: 60° F BHST 80° F 10 bbls fresh water followed by 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. LEAD CEMENT TYPE: ADDITIVES: Retarder WEIGHT: 12.0 ppg APPROX #SACKS: 611 TAIL CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.2% Halad 344 WEIGHT: 15.Sppg APPROX # SACKS: 727 FLUID LOSS: 100-150 cc Type E Permafrost YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk THICKENING TIME: Greater than 3-4 hrs at 60° F. YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk THICKENING TIME: 3-4 hours @ 60° F. FREE WATER: 0cc @ 45 degree angle. STAGE II CEMENT JOB ACROSS Prince Creek to Surface: CIRC. TEMP: 60° F BHST 40° F SPACER: 75 bbls fresh water. LEAD CEMENT TYPE: ADDITIVES: Retarder Type E Permafrost WEIGHT: 12.0 ppg APPROX #SACKS: 704 TAIL CEMENT TYPE: ADDITIVES: 2% CaCI2 WEIGHT: 15.8ppg APPROX # SACKS: 50 FLUID LOSS: 100-150 cc YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk THICKENING TIME: Greater than 3-4 hrs at 60° F. Premium G YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk THICKENING TIME: 3-4 hours @ 60° F. FREE WATER: 0cc @ 45 degree angle. TOP JOB CEMENT TYPE: Type E Permafrost ADDITIVES: Retarder WEIGHT: 12.0 ppg APPROX NO SACKS: 250 YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk CENTRALIZER PLACEMENT: 1. 9-5/8" x 12" Straight Blade Rigid Centralizers-- two per joint on the bottom 39 joints of 9- 5/8" Casing (78 total). This will cover 200' above the Na Sand. 2. Run one 9-5/8" x 12" Straight Blade Rigid Centralizer on each side of ES Cementer (2 Total). 3. Total 9-5/8" x 12" Straight Blade Rigid Centralizers needed is 80. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacedmud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 10-14 bpm. Batch mixing is not necessary. CEMENT VOLUME: 1. Stage 1 cement volume is calculated to cover 500' md above the Na Sand with 30% excess. 2. Stage 2 cement volume is calculated to cover from the top of Stage 1 to 1500' md with 30% excess and from 1500' md to surface with 100% excess. CIRC. TEMP: SPACER' 11 CEMENT MPH-07 Well PRODUCTION CASING PROGRAM- HALLIBURTON 140o F BHST:170 deg F at 7040' TVDSS. 20 bbls fresh water. 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. LEAD CEMENT TYPE: ADDITIVES: Retarder WEIGHT: 12.0 ppg Type E Permafrost YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk APPROX #SACKS: None THICKENING TIME: Greater than 3-4 hrs at 180° F. TAIL CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344 WEIGHT: 15.8ppg YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk APPROX # SACKS: 222 THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F FLUID LOSS: < 50cc/30 rain @ 140° F FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: 1. 7-1/8"" x 8-1/4" Straight Blade Turbulators -- 38 Total (2 per joint on bottom 19 joints). 2. Run two 7-1/8" x 8-1/4" Straight Blade Centralizer 60' above the 9-5/8" casing shoe. 3. Total 7-1/8 .... x 8-1/4" RH Turbulators needed is 40. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix slurry on the fly -- batch mixing is not necessary. CEMENT VOLUME: 1. The cement volume is calculated to cover 1000' md above the C1 Sand with 30% excess. i i i [, ..... SHARED DRTLLT,NG lnadr~ ]] Sch]umberger ii i i i ii iiii ii MPH-07 (PO6) VEFITICAL SECTION VIEW _ ii i _ i i iii Section at: ~72.3B TVD Scale,' ] ~nch: t600' feet Dep Scale.' 1 inch = ~600 feet Oeo~n ..... ' 08/~/~§, K ) " A ...... i ...... PIOFKer ,LOE~IT. IflC~T. IUI1 PIU ORl~ I A) K8 0 0 0 0.( B] KOP/6UILD J/JO0 500 500 -0 B--, C) BUILD 1.5/100 SO0 900 14 4.00 ..... I "' DI BUILD 2/100 t300 i297 63 iO.O0 i- - C '~- El BUILD 3/100 1700 1684 159 ~e.oo O ~" I F) END 3/100 BUILD 3600 2939 t481 74.! ,,, G) 9-5/0" CASING POINT 8723 4266 6430 74.99 t E "~ ) H) Df:lOP 2/100 13291 5449 10842 74.! I] END 2/100 DROP 15040 6374 12294 40.( ,J)TARGET 1§440 66ot 12551 4o.I ~ ......... K] 7" CASING POINT 15878 7016 12632 40.t L)TO 15870 7016 12832 40.( f .~..,..~,, - .... __ )~ °~. ~ .... , ExEcu rloh~ ~ J I 0 BOO I600 2400 3200 4000 4800 5600 6400 7200 BO00 0800 9600 10400 11200 12000 12000 13600 Sect ion Departure {Anadr'm]] (C)9,3 MPHOTP6 6J.52 4:02 PI(l) i ~0 U1 0 ~0 0 , 0 O9:11 Anadrill Marker Ident i ficat ion MO A) KB 0 BI K0P/BUIL0 1/100 500 CI BUILO .1.5/100 '900 OI BU1LO 2/100 I300 £] BUILD 3/100 'l?O0 FI END 3/100 BUILD: 3600 6} 9-5/B' CASING POINT 8723 H) "OROP 2/~00 t3291 I) ENO 2/100 DROP 15040 J) TARGET ' 15440 K) 7' CASING POINT t5878 L) TO' 15878 DPC ~)07_ 344 ~2].4~0 P. 06 -, ). SERVICES ' DF~I-L'L,!'NG_ ' _ ' ' m, _ i mm_ I ~ m mml I · · "'~"'" MPH-07 (PO6) o PLAN VIEW ~sa ~ CLOSURE ' ~283~ feet at Azimuth ~72.38 ~468 6373 85~ DECLINATION.' 28.825 E to746 t437 SCALE ....... : 1 inch = 2000 feet t2tBB t629 ~a44~ t~ DRAWN · 0B/3~/95 ~87~g ~27~9 t701 ~nadrY ]1 SchYumberger ..... i ~ ~ . "'"'"""FE, ASIB"" LIT'r' PLAN _ .... I ' ! . t _, : I ~,.I : ,~ . _ · :_ _ , , - ....... ~ L . ~ = _ ....... -- · ~ , , i, - '100 FT I~,RGET flAI IUS I . _ 70[}0 §000 5000 ~000 ~000 ~000 1000 ~ I000 ~000 ~000 ~000 ~00 riO00 7000 BP EXPLORATION To: From: Date: Subject: Bob Crandall, AOGCC Joe Polya, BP (Shared Services Drilling) September 1, 1995 Application for Spacing Exception -- Milne Point H-07 Kuparuk Producing Well (20 AAC 25.055) The MPH-07 well is planned to drill into the Kuparuk River formation in the Southwest Quarter of Section 11, T12N, R10E. This section is located to the South of the Milne Point Unit Boundary. This quarter section is bounded on the West, Northwest, and North, Northeast, and East by quarter sections within ADL 380109 for which the operators are BPX 91.19 and Oxy USA 8.81; on the Southeast and South ADL 025637 for which the operators are Arco 50.00 and BPX 50.00; and on the Southwest by ADL 025636 for which the operators are Arco 50.00 and BPX 50.00. See the Attached Map. The MPH-07 well is planned as a high angle producer to be completed with an electric submersible pump. The Surface Location for the MPH-07 well is 2709' fsl and 4079' fel in Section 34 T13N R10E. Entry Point in the Kuparuk formation (C1 Sand) is planned for 0828' fsl and 2428' in Section 11, T12N, R10E with the planned TD at 0550' fsl and 2391' fel Section 11, T12N, R10E. We have notified all owners and operators via registered mail as per the AOGCC Regulation 20 AAC 25.055 -- See Attached Plats and Registered Mail Notice. This well is contingent upon the results of MPH-06 and could be drilled immediately after MPH-08 in the schedule which could be as early as September 25, 1995. Thank you for your assistance in this matter. Please direct any questions to Mark Bendersky at 564-4666. Respectfully, Joe Polya CC; Arco BPX Oxy USA Mark Bendersky S['P 0 t 995 _Alaska .OJl.& 6as Cons. Commission "gnchorago MPU Boundary ADL 380109 H-05 0 H-08 Boundary ADL 380110 I I I I I I 7 8 H Pad Tract Development Tract Well H-07 1 Mile 25 August 1995 Z-142 754 031 _Receipt for Certified Mail No Insurance Coverage Provided U'~,T~OS~ATES DO not use for International Mail POSTAL SER~K~E (See Reverse) P.O. £tate and ZIP Code Certified Fee Special De!ivery Fee Restricted Delivery Fee r~e;_urn Receipt Shc,~,.ir~g Z 142 7~LI B30 Certified iVtaii No Insurance Coverage Provided Do not use for International Mail (See ReverseL Certified Fee Special Deliver,/ Fee , . Restricted Delivery Fee Return Receipt Sn:)win~ i . . . Return Receipt Showing to Date, and AdO~S¢'s'A~ress & Fee~ ff'f" -- Postgark ~; D~te '' - EP 0'1 !995 Gas Cons, Commission Anchorage WELL PERMIT CHECKLIST co~ ~ ~L~. ,~, .. _ ? ~Ro~: ~p [] der [] r~rll [] serv [] ENGINEERING GEOLOGY 1. ~e~=~t Cee attached .................. 2. Lease number approprta,e ............... 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit bounda~. ' 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party ............... 10. Operator has appropriate bond in force ......... 11. Ps,it can be issued without conse~atio~ order .... 12. Ps,it can be issued without a~lnistrative approval. 13. Can pe~it be approv~ before 15-day wait ........ , · , ................ 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg. ~ N 17. CMT vol adequate to tie-in long string to surf csg . . .~,~Y ~ 18. CMT will cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............ 21. If a re-drill, has a 10-403 for abndnmnt been approved. .Y N ~ 22. Adequate wellbore separation proposed ......... 6 N 23. If diverter required, is it adequate ........... Y N ~ 24. Drilling fluid program schematic & equip list adequate ~ N 25. BOPEs adequate ............ .__ ....... ~ N 26. BOPE press rating adequate; test to ~ psig.~ N 27. Choke manifold complies w/API RP-53 (~ay 84) ...... ~--~~ 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............ ~ N 30. Permit can be issued w/o hydrogen sulfide measures .... Y. N/ 31. Data presented on potential overpressure zones ..... 32. Seismic analysis 9f shallow gas zones .......... y N 33. Seabed condition survey (if off-shore) ........ ~/Y N 34. Contact name/phone for weekly progress reports .... /. Y N [exploratory only] Comments/Instructions: '~ - A:~:ORMS%cheklist ~v 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. ALASKA coMpUTING cENTER . *********************** CNLUNBERGER ...... : B.P. EXPLORATION coMpANY NAME · MpH-07 WELL NAt4E : ~ILNE pOINT FIELD NAME · NORTH sLOPE BOROUGH . ALASKA · STATE 50_029-22597-00 API NUMBER REFERENCE NO : 95331 ], LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE . 96/08/16 ORIGIN : FLIC REEL NAME : 95331 CONTINUATION # : PREVIOUS REEL : COPff4ENT : B.P. EXPLORATION, MILNE POINT MPH-07, API #50-029-22597-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 96/08/16 ORIGIN : FLIC TAPE NAME : 95331 CONTINUATION # : 1 PREVIOUS TAPE COf4MENT : B.P. EXPLORATION, MILNE POINT MPH-07, API #50-029-22597-00 TAPE HEADER MILNE POINT MWD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MPH-07 500292259700 B.P. EXPLORATION SCHLUMBERGER WELL SERVICES 16-AUG-96 WELL CASING RECORD 1ST STRING 2ND STRING BIT RUN1 BIT RUN2 BIT RUN 3 95331 95331 95331 DENNETT RUMINER RUMINER MOUNTJOY MOUNTJOY PYRON 34 13N iOE 2709 4079 65.90 65.90 36.10 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 20.000 112.0 8.500 9.625 9217.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 3RD STRING PRODUCTION STRING RENARKS: Well drilled ll-SEP through 23-SEP-95 with CDR/CDN. Ail data was collected in three bit runs. $ $ PAGE: **** FILE H~ER **** FILE NAME : EDIT .001 SERVICE ' FLIC VERSION : O01CO1 DATE : 96/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INC~: 0.5000 FILE SUNk~ARY LDWG TOOL CODE START DEPTH MWD 4909.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 88888.0 8923.0 8917.5 8906.0 8898.5 8893.0 8885 5 8873 0 8868 5 8865 0 8855 5 8838 5 8827.5 8824.5 8810.5 8779.5 8766.5 8739.0 8734.5 STOP DEPTH .......... 15920.5 .......... EQUIVALENT UNSHIFTED DEPTH ....... 88910.0 8945.0 8939.5 8926.5 8918 5 8911 0 8905 5 8890 5 8886 0 8882 5 8872 5 8856 5 8844.5 8841.0 8827.5 8799.0 8784.5 8755.5 8752.0 LIS Tape Veritication Listing Schlumberger Alaska Computing Center 8679.0 8668.5 8654.5 8636.0 8629.5 8622.0 8606.5 8596.5 8572.5 8556.0 8538.0 8525.5 8510 5 8502 5 8462 0 8445 0 8433 5 8430 5 8425.5 8421.5 8411.5 8405.5 8391.0 8383.5 8372.5 8354.5 8336.5 8331.0 8326.0 8317.5 8310.0 8291.5 8287.0 8274.5 8242.5 8232.0 8229.5 8218.5 8172.5 8126.5 8099.5 8093.5 8060.0 8045.0 8039.5 8037.5 8027 0 8014 5 7994 5 7954 5 7941 0 7938 0 7931.0 7908.0 7892.5 8701.0 8690.5 8675.0 8652.5 8646.5 8638.5 8618.0 8607.5 8588.5 8571.0 8552.5 8541.5 8527.5 8518.5 8478.0 8462.0 8447 5 8445 0 8440 0 8436 0 8423 5 8417 5 8404.0 8398.5 8387.0 8369.0 8353.0 8346.5 8339.5 8333.0 8324.0 8304.0 8300.5 8289.0 8255.5 8245.0 8244.0 8232.0 8186.0 8139.5 8109.5 8104.5 8076.0 8060.0 8054.5 8050.5 8041.0 8030.5 8008.0 7967.5 7955.0 7951.5 7946.0 7925.0 7908.0 16-AUG-1996 10:00 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 7887.5 7874.0 7866.5 7844.0 7808.5 7801.0 7793.0 7767.5 7742.0 7737.5 7714.5 7697.0 7689.0 7674.5 7667.0 7659.0 7639.0 7627.0 7620.0 7600.0 7587.0 7578.5 7554.0 7526.5 7525.0 7511.0 7504.5 7499 0 7488 0 7479 5 7462 5 7448 5 7436, 0 7433 5 7406, 5 7380.5 7370.5 7356.0 7351.0 7331.0 7304.5 7284.5 7270.0 7243.0 7202.5 7178.5 7122 5 7116 0 7111 0 7090 0 7069 0 7062 5 7048 5 7044.5 7034.0 7901.5 7890.0 7879.5 7858.0 7825.5 7817.0 7806.5 7783 0 7758 5 7752 0 7730 0 7710 5 7702 0 7686 0 7681 5 7673.0 7655.0 7643.5 7632.0 7614.5 7600.0 7589.5 7564.5 7537.5 7535.0 7522.0 7517.5 7513.5 7502.5 7493.0 7475.0 7459.5 7448.0 7443.0 7418.0 7390.5 7381.5 73 68.5 73 64.5 7344.0 7318.0 7298.5 7282.5 7256.5 7216.5 7192.0 7133.0 7130.0 7125.5 7104.5 7080.0 7073.0 7061.0 7056.0 7048.0 16-AUG-1996 10:00 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 7011.5 6998.0 6970.5 6959.0 6952.0 6943.0 6933.0 6861.5 6845.5 6841.5 6819.5 6796.0 6781.0 6751.0 6730.5 6720.5 6709.0 6697.5 6695.5 6676.0 6673.5 6662.5 6656.0 6627.5 6593.0 6578.0 6546.0 6544.5 6542.0 6530. 0 6489.5 6481.5 6479.0 6465.0 6461.5 6454.0 6451.5 6383.0 6380.5 6374.0 63 66.0 63 61.0 6350.0 6344.5 6332.0 6293.0 6285.0 6236.5 6175.0 6160.0 6109.0 6035.0 6009.5 6000.0 5990.5 7024.0 7012 0 6985 0 6973 5 6964 0 6955 5 6947 0 6872 5 6858 5 6855 5 6834 0 6809 5 6794 5 6763.0 6743.0 6734.5 6722.0 6712.0 6706.0 6690.0 6687.0 6674.0 6668.0 6638.0 6604.5 6589.0 6556.0 6554.5 6553.0 6541.5 6500.0 6492 5 6487 5 6472 5 6465 5 6459 5 6456 5 6390 5 6386 5 6380.5 6372.5 63 69.5 6358.0 6349.5 6338.5 63 O1.0 6294.5 6248.0 6184.0 6168.5 6117.5 6044.0 6021.0 6010.5 5997.5 16-AUG-1996 10:00 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 5980 0 5961 5 5916 0 5908 0 5890 0 5868 5 5856 0 5837.0 5826.0 5813.5 5809.5 5794.0 5789.0 5770.5 5763.5 5757.5 5732.5 5664.5 5655.5 5651.5 5646.0 5619 0 5605 5 5571 5 5562 0 5559 0 5540 0 5533 0 5523.5 5506.5 5478.5 5456.5 5445.5 5434.5 5415.0 5411.0 5398.5 5336.5 5322.5 5315.5 5283.0 5267.5 5229.5 5209.5 5182.0 5133.5 5091.5 5074.5 5039.5 5026.0 5004.5 4996.0 4979.5 4975.0 4955.0 5989.0 5969.0 5924.0 5919.0 5900.5 5878 5 5864 5 5845 0 5835 0 5818 5 5816 5 5803 5 5797 5 5777.0 5770.0 5763.5 5738.0 5673.5 5665.5 5660.5 5655.5 5627.5 5612.5 5582.5 5575.0 5569.5 5545.0 5540.0 5533.0 5512.5 5484.0 5463.5 5451.5 5439.0 5425.5 5418.5 5406.5 5342.5 5331.0 5324.5 5293.0 5276.5 5236.0 5218.0 5190.0 5141.0 5098.0 5081.0 5047.0 5031.5 5008.0 5000.5 4989.0 4983.5 4960.5 16-AUG-1996 10:00 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 4934.5 4929.0 4924.0 4909.5 100.0 $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: 4942.0 4937.5 4932.5 4916.0 106.5 BIT RUN NO. MERGE TOP MERGE BASE 1 4909.0 9240.0 2 9240.0 13479.0 3 13479.0 15920.0 The depth adjustments shown above reflect the MWD GR to the CH GR logged by Atlas. All other MWD curves were carried with the GR. This file also contains the Very Enhanced QRO resisitivity with 2' average that was reprocessed at GeoQuest. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 60 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 17 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 8 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 630158 O0 000 O0 0 1 1 1 4 68 0000000000 RA MWD OH~ff4630158 O0 000 O0 0 1 1 1 4 68 0000000000 RP MWD OPk4~I630158 O0 000 O0 0 1 1 1 4 68 0000000000 VRA MWD OH~!M 630158 O0 000 O0 0 1 1 1 4 68 0000000000 VRP MWD OH~IM 630158 O0 000 O0 0 1 1 1 4 68 0000000000 DER MWD OH~ff4630158 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR 630158 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 630158 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 630158 O0 000 O0 0 1 1 1 4 68 0000000000 RHOBMWD G/C3 630158 O0 000 O0 0 1 1 1 4 68 0000000000 DRHOMWD G/C3 630158 O0 000 O0 0 1 1 1 4 68 0000000000 PEF MWD BN/E 630158 O0 000 O0 0 1 1 1 4 68 0000000000 CALNMWD IN 630158 O0 000 O0 0 1 1 1 4 68 0000000000 NPHIMWD PU-S 630158 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH TIE GAPI 630158 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 15920.000 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD -999.250 VRP.MWD -999.250 DER.MWD -999.250 ROP.MWD 116.421 FET.MWD -999.250 GR.MWD -999.250 RHOB.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 CA_LN. MWD -999.250 NPHI.MWD -999.250 GRCH. TIE -999.250 DEPT. 4902.000 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD -999.250 VRP.MWD -999.250 DER.MWD -999.250 ROP.MWD -999.250 FET.MWD -999.250 GR.MWD -999.250 RHOB.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 CALN. MWD -999.250 NPHI.MWD -999.250 GRCH. TIE 50.748 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE . FLIC VERSION : O01CO1 DATE : 96/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NLT~fBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: O . 5000 FILE S07~4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 4903.0 9240.0 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CDR RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : MUD CHLORIDES (PPM) : 23-SEP-95 FAST2.5 4.0 MEMORY 15899.0 4904.0 15899.0 80 73.1 76.2 TOOL NUMBER RGS904 12.250 112.0 LSND 10.20 50.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 10 FLUID LOSS (C3): RESISTIVITY (OH~R4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 2. 630 1 . 630 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: ***RUN1 - CDR ONLY 4963'-9240'*** RES TO BIT: 51.85'; GR TO BIT: 62.27' Rm=2.38@75 DEG, Rmf=2.13@75 DEG ***RUN2 - CDR/CDN 9240'-13479'*** RES TO BIT: 53.77'; GR TO BIT: 64.19' DEN TO BIT: 108.47'; NEUT TO BIT: 115.49' ***RUN3 - CDR/CDN 13479'-15899'*** DIST TO BIT SAME AS RUN 2 $ LIS FORMAT DATA 75.0 75.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 11 ** SET TYPE - CHAN ** NA~4E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 630158 ATR LW1 OP~4~ 630158 PSR LW1 OA?4M 630158 DER LW1 OH~IM 630158 ROPE LWl F/HR 630158 TABR LW1 HR 630158 GR LW1 GAPI 630158 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 * * DA TA * * DEPT. 9240. 000 ATR. LW1 -999. 250 PSR. LW1 -999. 250 ROPE.LWl 201.801 TABR.LW1 -999.250 GR.LW1 -999.250 DEPT. 4902. 500 ATR. LW1 -999. 250 PSR. LW1 ~ 999. 250 ROPE.LW1 -999.250 TABR.LW1 -999.250 GR.LW1 83.808 DER. LW1 DER. LW1 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 12 DEPTH INCREMENT: 0.5000 FILE SUM~JiRY VENDOR TOOL CODE START DEPTH MWD 9126.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (M~4ORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CDR RESIST./GR CDN NEUT./DENS. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) '. FLUID LOSS (C3): RESISTIVITY (OH~4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TE~4PERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): STOP DEPTH 13479.0 REMARKS: ***RUN 1 - CDR ONLY 4963'-9240'*** 23-SEP-95 FAST2.5 4.0 MEMORY 15899.0 4904.0 15899.0 80 72.1 73.1 TOOL NUMBER RGS022 NDS022 12.250 112.0 LSND 10.20 50.0 600 2. 630 75.0 1. 630 75.0 SANDSTONE 2.65 1.0 20000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 13 RES TO BIT: 51.85'; GR TO BIT: 62.27' Rm=2.38@75 DEG, Rmf=2.13@75 DEG ***RUN 2 - CDR/CDN 9240'-13479'*** RES TO BIT: 53.77'; GR TO BIT: 64.19' DEN TO BIT: 108.47'; NEUT TO BIT.. 115.49' ***RUN 3 - CDR/CDN 13479'-15899'*** DIST TO BIT SAME AS RUN 2 $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 60 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 17 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE ~ CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 630158 O0 000 O0 0 3 1 1 4 68 0000000000 ATR LW2 OH~4~ 630158 O0 000 O0 0 3 1 1 4 68 0000000000 PSR LW2 OH~4 630158 O0 000 O0 0 3 1 1 4 68 0000000000 DER LW2 OH~ 630158 O0 000 O0 0 3 1 1 4 68 0000000000 ROPE LW2 F/HR 630158 O0 000 O0 0 3 1 1 4 68 0000000000 TABR LW2 HR 630158 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 630158 O0 000 O0 0 3 1 1 4 68 0000000000 RHOB LW2 G/C3 630158 O0 000 O0 0 3 1 1 4 68 0000000000 DRHO LW2 G/C3 630158 O0 000 O0 0 3 1 1 4 68 0000000000 PEF LW2 BN/E 630158 O0 000 O0 0 3 1 1 4 68 0000000000 CALNLW2 IN 630158 O0 000 O0 0 3 1 1 4 68 0000000000 TNPH LW2 PU 630158 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 14 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TABD LW2 630158 O0 000 O0 0 3 1 1 4 68 0000000000 DPHI LW2 PU 630158 O0 000 O0 0 3 1 1 4 68 0000000000 DCAL LW2 IN 630158 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 13479.000 ATR.LW2 -999.250 PSR.LW2 -999.250 DER.LW2 ROPE.LW2 146.344 TABR.LW2 -999.250 GR.LW2 -999.250 RHOB.LW2 DRHO.LW2 -999.250 PEF.LW2 -999.250 CALN. LW2 -999.250 TNPH.LW2 TABD.LW2 -999.250 DPHI.LW2 -999.250 DCAL.LW2 -999.250 DEPT. 9126.000 ATR.LW2 -999.250 PSR.LW2 -999.250 DER.LW2 ROPE.LW2 -999.250 TABR.LW2 -999.250 GR.LW2 -999.250 RHOB.LW2 DRHO. LW2 -999. 250 PEF. LW2 -999. 250 CALN. LW2 - 999. 250 TNPH. LW2 TABD.LW2 -999.250 DPHI.LW2 -999.250 DCAL.LW2 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 50.500 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: 0.5000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 15 FILE S~Y VENDOR TOOL CODE START DEPTH MWD 13328.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 15898.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CDR RESIST./GR CDN NEUT./DENS. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~4~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 23-SEP-95 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): FAST2.5 4.0 MEMORY 15899.0 4904.0 15899.0 75 36.2 72.1 TOOL NUMBER RGS022 NDS022 12.250 112.0 LSND 10.20 50.0 600 2. 630 75.0 1.630 75.0 REMARKS: ***RUN 1 - CDR ONLY 4963'-9240'*** RES TO BIT: 51.85'; GR TO BIT: 62.27' 1.0 20000 SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 16 Rm=2.38@75 DEG, Rmf=2.13@75 DEG ***RUN 2 - CDR/CDN 9240'-13479'*** RES TO BIT: 53.77'; GR TO BIT: 64.19' DEN TO BIT: 108.47'; NEUT TO BIT: 115.49' ***RUN 3 - CDR/CDN 13479'-15899'*** DIST TO BIT SAME AS RUN 2 $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 60 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 17 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 630158 O0 000 O0 0 4 1 1 4 68 0000000000 ATR LW3 OPL~ 630158 O0 000 O0 0 4 1 1 4 68 0000000000 PSR LW3 OH~4~ 630158 O0 000 O0 0 4 1 1 4 68 0000000000 DER LW3 OH~M 630158 O0 000 O0 0 4 1 1 4 68 0000000000 ROPE LW3 F/HR 630158 O0 000 O0 0 4 1 1 4 68 0000000000 TABR LW3 HR 630158 O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI 630158 O0 000 O0 0 4 1 1 4 68 0000000000 RHOB LW3 G/C3 630158 O0 000 O0 0 4 1 1 4 68 0000000000 DRHO LW3 G/C3 630158 O0 000 O0 0 4 1 1 4 68 0000000000 PEF LW3 BN/E 630158 O0 000 O0 0 4 1 1 4 68 0000000000 CALN LW3 IN 630158 O0 000 O0 0 4 1 1 4 68 0000000000 TNPH LW3 PU 630158 O0 000 O0 0 4 1 1 4 68 0000000000 TABD LW3 630158 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-AUG-1996 10:00 PAGE: 17 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DPHI LW3 PU 630158 O0 000 O0 0 4 1 1 4 68 0000000000 DCALLW3 IN 630158 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 15898. 500 ATR. LW3 -999. 250 PSR. LW3 - 999. 250 DER. LW3 ROPE.LW3 116.421 TABR.LW3 -999.250 GR.LW3 -999.250 RHOB.LW3 DRHO. LW3 -999. 250 PEF. LW3 -999. 250 CALN. LW3 -999. 250 TNPH. LW3 TABD.LW3 -999.250 DPHI.LW3 -999.250 DCAL.LW3 -999.250 DEPT. 13327. 500 ATR. LW3 -999. 250 PSR. LW3 ~ 999. 250 DER. LW3 ROPE. LW3 - 999. 250 TABR. LW3 - 999. 250 GR. LW3 ~ 999.250 RHOB. LW3 DRHO.LW3 -999.250 PEF.LW3 -999.250 CALN. LW3 -999.250 TNPH.LW3 TABD.LW3 -999.250 DPHI.LW3 -999.250 DCAL.LW3 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 39.300 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 96/08/16 ORIGIN . FLIC TAPE NAME : 95331 CONTINUATION # : 1 PREVIOUS TAPE : COf~4ENT : B.P. EXPLORATION, MILNE POINT MPH-07, API #50-029-22597-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 96/08/16 ORIGIN : FLIC REEL NAME : 95331 CONTINUATION # : PREVIOUS REEL : COIZk4ENT ' B.P. EXPLORATION, MILNE POINT MPH-07, API #50-029-22597-00 MPH - 07 MILNE POINT // Run 1' ::'!/:i:~. 17- June- 1996 ..................... · ..... GR/CCL :, Marked Line Ir/ii WESTERN ATLAS 8971' Logging Services Tape Subfile-2 is type: L_~ TAPE HEADER MILNE POINT UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MPH-07 500292259700 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 08-AUG-96 6712.00 K. BRUNNER D. HILDRETH 34 13N 10E 2709 4079 65.90 36.10 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) lST STRING 2ND STRING 3RD STRING PRODUCTION STRING 9.625 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ 9217.0 47.00 GR GRCH 1 1 17-JUN-96 WESTERN ATLAS LOGGING SERVICES REMARKS: GR/CCL MARKED LINE. EQUIVALENT UNSHIFTED DEPTH *** THIS IS THE DEPTH REFERENCE FOR THIS WELL *** NOTE: THERE WAS NO REPEAT PASS - THEREFORE THERE WAS NO REPEAT PASS TO DEPTH SHIFT TO THE MAIN PASS. FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 20.0 8970.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE PASS NUMBER: BASELINE DEPTH $ REMARKS: EQUIVALENT UNSHIFTED DEPTH - PASS 1 (MAIN PASS) . NO DEPTH SHIFTS WERE DONE SINCE THIS IS THE DEPTH REFERENCE. CN : BP EXPLORATION WN : MPH - 07 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 1 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH GR 68 1 GAPI 4 4 30 995 99 1 * DATA RECORD (TYPE# 0) 1022 BYTES * Total Data Records: 142 Tape File Start Depth = 15.000000 Tape File End Depth = 8975.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 35843 datums Tape Subfile: 2 230 records... Minimum record length: 62 bytes Maximum record length: 1022 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file, PASS NUMBER: 1 DEPTH INCREMENT: 0,2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 20,0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SBAR SBAR SBAR SBAR CCL PCM GR $ SWIVEL SINKER BAR SINKER BAR SINKER BAR SINKER BAR CASING COLLAR LOC, PULSE CODE MODULATOR GAMMA RAY BOREHOLE AND .CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: STOP DEPTH 8982,0 17-JUN-96 FSYS REV, J001 VER, 1,1 1036 17-JUN-96 8950,0 8972,0 20,0 8971,0 3600,0 YES TOOL NUMBER 3913NA 8248EA 8250EA 8262XA 0.000 9217.0 0,0 SEAWATER 8,50 0,0 0.0 0 0,0 0,000 0,000 0,000 0,0 0.00 HOLE CORRECTION (IN~ 0.6 ~ BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS) : 0 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS) : 0 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1 (MAIN PASS) . $ CN : BP EXPLORATION WN : MPH - 07 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 1 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 1 GAPI 4 4 30 995 99 1 * DATA RECORD (TYPE# 0) 1022 BYTES * Total Data Records: 141 Tape File Start Depth = 20.000000 Tape File End Depth = 8972.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 35811 datums Tape Subfile: 3 219 records... Minimum record length: Maximum record length: 62 bytes 1022 bytes Tape Subfile 4 is type: LIS 96/ 8/ 8 O1 **** REEL TRAILER **** 96/ 8/ 8 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 8 AUG 96 11:54a Elapsed execution time = 10.54 seconds. SYSTEM RETURN CODE = 0 PRUDHOE BAY) ~ Run 1' 25 - August - 1995 PDK-1001GR Borax Log WESTERN ATLAS- ~E~g~~g Services 10050 10870 Tape Subfile 2 is type: TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD H - 07 500292024200 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 29 -AUG- 95 4096.03 BRAD ESARY S. SHIRZADI 21 liN 13E 569 1265 76.40 0.00 45.75 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) lST STRING 2ND STRING 9.625 9935.0 3RD STRING 7.000 11058.0 PRODUCTION STRING 7.000 9472.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 10-APR-77 SWS BASELINE DEPTH 10045.0 10053.5 10071.5 10072.0 10099.5 10103.5 10104.5 10105.0 10106.0 10106.5 10135.5 10136.0 10137.0 GRCH 10045.0 10055.5 10073.0 10073.5 10101.5 10105.5 10106.0 10106.5 10107.0 10107.5 10137.0 10137.5 10138.0 EQUIVALENT UNSHIFTED DEPTH 47.00 29.00 26.00 10147.0 10152.0 10155.5 10156.5 10157.0 10184.0 10194.5 10195.0 10196.0 10211.5 10219.5 10224.0 10227.5 10228.5 10237.5 10243.0 10244.0 10246.0 10258.5 10259.0 10260.0 10261.0 10268.0 10269.0 10271.0 10423.0 10425.0 10426.0 10426.5 10436.0 10436.5 10437.5 10438.5 10439.5 10446.0 10447.0 10500.0 10540.0 10719.5 10720.5 10721.0 10728.5 10731.0 10732.0 10732.5 10764.5 10839.5 10840.5 10841.5 10842.0 10846.0 10851.5 10852.0 $ REMARKS: 101 .0 10154.0 10157.5 10158.0 10158.5 10184.5 10196.5 10197.0 10197.5 10213.0 10220.5 10225.0 10229.0 10229.5 10239.0 10244.5 10245.0 10247.0 10260.0 10260.5 10261.0 10261.5 10268.5 10269.0 10271.0 10424.5 10426.5 10427.0 10427.5 10438.0 10438.5 10439.0 10440.0 10440.5 10447.0 10447.5 10500.0 10541.5 10720.0 10720.5 10721.0 10730.0 10732.5 10733.0 10733.5 10765.0 10840.5 10841.5 10842.0 10842.5 10847.5 10853.0 10853.5 PDK-100/GR. LOG TIED INTO BHCS DATED 29-APR-77 WELL TEST SUMMARY TEST DATE 13 -AUG- 95 (sws). ELAPSED ME GROSS FLUID RATE NET OIL RATE NET WATER RATE FORMATION GAS RATE GOR LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING MANIFOLD PRESSURE HOURS 4.0 MBPD 1.86 MBOPD 1.17 MBWPD 0.70 MMSCFD 17.56 SCF/STB 15074 MMSCFD 0.00 PSIG 0 SCF/STB 15074 SCF/BBL 9437 55.1 PSIG 2085 160 37.4 MANIFOLD TEMPERATURE DEGF WATER CUT (CALC) PCNT FIRST ATTEMPTED LOGGING PASSES WITH CHOKE SET AT 40 THEN 35. TOOL SOURCE QUIT WHEN ENTERING PERFORATION. SET CHOKE AT 30. LOGGING SUITE ORGANIZATION: 1) PDK PASS 1 LOGGED AT 15 TO 20 FPM. 2) PDK PASS 2 AT 10 FPM. 3) PDK PASS 3 AT 10 FPM. SOURCE QUIT BEFORE PASS COMPLETED. WELL SHUT-IN 19:00 25-AUG-95. POOH AND RUN SECOND PDK TOOL WITH CENTRALIZER ON BOTTOM. BORAX LOGS RUN TO DETECT GAS CHANNEL. 4) BASE SEAWATER PASS 1 - 25 BBLS SEAWATER PUMPED INTO FORMATION. 5) BORAX PASS 2 - 35 BBLS BORAX PUMPED INTO FORMATION. 6) BORAX PASS 3 - 55 BBLS BORAX PUMPED INTO FORMATION. 7) BORAX PASS 4 - 62 BBLS BORAX PUMPED INTO FORMATION. 8) BORAX PASS 5 - 25 BBLS SEAWATER FLUSHED INTO FORMATION. 9) BACKGROUND PASS - SOURCE OFF. WELL FLOWING. LOGGED AFTER PDK PASS 3. A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR THE FLOWING PASSES & THE BASE SEAWATER PASS. THE CURVE IS CALLED SGNT AND WAS CORRECTED WITH THE FOLLOWING PARAMETERS: BOREHOLE SIZE = 8.0" CASING SIZE = 7.0" SALINITY = 0 PPM. A PDK POROSITY CURVE (PHI) WAS ALSO CREATED FOR THE FLOWING PASSES & THE BASE SEAWATER PASS. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS SGMA (PDK) DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT PDK PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS PDK. / ? ?MATCH2A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE START DEPTH GRCH 10050.0 PDK 10050.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH SGMA 10099.5 10101.5 10100.0 10102.0 10101.0 10102.5 10103.5 10105.0 10104.0 10106.0 10104.5 10106.5 10105.5 10107.0 10106.5 10108.0 10132.0 10134.5 10133.5 10136.0 10134.5 10136.5 10136.0 10137.0 10137.0 10137.5 10146.0 10146.5 10160.5 10163.5 10163.5 10166.5 10164.5 10167.0 10166.0 10167.5 10168.0 10168.0 10168.5 10168.5 10204.5 10205.0 10207.0 10207.5 10217.0 10218.0 10219.0 10220.0 10219.5 10221.0 10221.5 10223.0 10241.5 10241.5 10244.0 10244.0 10244.5 10245.0 10245.5 10248.0 10246.0 10248.5 10276.0 10278.0 10278.5 10280.5 10279.5 10281.0 10283.5 10285.0 10397.0 10398.0 10415.0 10417.0 10415.5 10417.5 10416.5 10418.0 for each pass in separate files. STOP DEPTH 10862.0 10874.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 10425.5 10426.5 10428.5 10429.5 10430.0 10430.5 10433.5 10434.0 10434.5 10435.5 10436.5 10437.5 10438.5 10439.5 10446.0 10447.0 10503.5 10533.0 10534.0 10535.0 10542.5 10543.5 10544.5 10545.0 10630.0 10674.0 10692.5 10693.0 10694.0 10703.0 10709.0 10711.5 10712.0 10715.0 10729.5 10734.5 10735.0 10736.5 10741.5 10765.0 10766.0 10798.0 10803.5 10840.5 10841.0 10848.5 10849.5 10852.0 10852.5 $ REMARKS: 104 '.0 10427.5 10429.5 10431.0 10431.5 10432.5 10435.5 10436.5 10437.0 10437.5 10438.5 10439.0 10440.0 10440.5 10447.0 10447.5 10504.0 10535.5 10536.5 10537.0 10544.5 10545.0 10546.0 10547.0 10629.5 10674.5 10693.5 10694.0 10694.5 10703.5 10711.0 10713.5 10714.5 10717.5 10730.5 10735.5 10736.5 10738.0 10742.5 10766.0 10766.5 10798.5 10804.5 10841.5 10842.5 10850.0 10850.5 10853.0 10853.5 PDK PASS 1 - WELL FLOWING. LOGGED AT 15 - 20 FPM. CHOKE SET AT 30. ALL PDK CURVES WERE SHIFTED WITH SGMA. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ? ?MATCH2 B. OUT $ CN WN FN COUN STAT : BP i LORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CSLS PDK 68 1 CU 4 6 LS PDK 68 1 CPS 4 7 SS PDK 68 1 CPS 4 8 MSD PDK 68 1 CU 4 9 RATO PDK 68 1 4 10 RBOR PDK 68 1 4 11 RICS PDK 68 1 4 12 RIN PDK 68 1 4 13 SGMA PDK 68 1 CU 4 14 SGMB PDK 68 1 CU 4 15 SGNT PDK 68 1 CU 4 16 PHI PDK 68 1 PU-S 4 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 64 * DATA RECORD (TYPE# 0) 958 BYTES * Total Data Records: 119 Tape File Start Depth = 10045.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 28238 datums Tape Subfile: 2 423 records... Minimum record length: 62 bytes Maximum record length: 958 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10650.0 10650.0 BASELINE DEPTH GRCH 10664.0 10668.5 10669.0 10669.5 10684.5 10688.0 10688.5 10689.5 10691.0 10705.5 10708.0 10708.5 10717.0 10718.0 10718.5 10719.5 10720.5 10721.0 10722.0 10722.0 10725.5 10727.0 10728.0 10729.5 10731.0 10732.5 10734.0 10733.0 10735.0 10734.5 10736.5 10741.5 10743.0 10754.5 10756.0 10760.0 10761.0 10768.5 10769.5 10784.0 10785.0 10784.5 10786.0 10799.0 10799.5 10813.5 10814.0 10814.5 STOP DEPTH 10862.0 10874.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 10664.5 10670.0 10670.5 10671.5 10685.5 10689.5 10690.0 10692.0 10706.5 10710.0 10711.5 10720.0 10720.5 10721.5 10722.5 10723.0 10724.5 10727.5 10729.0 10729.5 10770.0 10770.5 10800.0 10801.0 10815.0 10816.0 10816.5 10815.5 10816.5 10817.0 10828.0 10829.0 10835.0 10835.5 10836.0 10837.0 10837.5 10838.5 10841.0 10842.0 10845.0 10846.0 10846.5 10847.0 10848.0 10849.0 10852.0 10855.0 10861.5 10862.0 10864.0 10864.5 $ REMARKS: 10836.5 10837.5 10838.0 10838.5 10839.0 10840.5 10843.0 10843.5 10847.0 10848.0 10849.0 10854.5 10857.0 10866.0 10866.5 10817.0 10818.0 10819.0 10830.0 10830.5 10836.5 10837.5 10848.5 10849.5 10850.5 10851.0 10863.5 10864.0 PDK PASS 2 - WELL FLOWING. LOGGED AT 10 FPM. CHOKE SET AT 30. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ? ?MATCH3A. OUT /??MATCH3B.OUT $ : BP EXPLORATION (ALASKA) : H- 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod GRCH PDK 68 1 GAPI BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CSLS PDK 68 1 CU LS PDK 68 1 CPS 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 7 SS PDK 68 1 CPS 8 MSD PDK 68 1 CU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SGNT PDK 68 I CU 16 PHI PDK 68 i PU-S * DATA RECORD (TYPE# O) Total Data Records: 33 4 4 4 4 4 4 4 4 4 4 958 BYTES * , 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 64 Tape File Start Depth = 10645.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7838 datums Tape Subfile: 3 130 records... Minimum record length: 62 bytes Maximum record length: 958 bytes Tape Subfile 4 is type: ~£S START DEPTH 10668.0 10680.0 BASELINE DEPTH 10690.0 10691.0 10702.0 10703.0 10705.5 10707.5 10708.0 10708.5 10713.0 10714.0 10717.0 10719.5 10720.5 10720.5 10721.0 10721.0 10721.5 10724.0 10729.0 10730.0 10734.5 10735.5 10736.5 10760.0 10760.5 10769.0 10770.0 10782.0 10782.5 10782.5 10783.5 10796.5 10808.0 10817.5 10818.0 10822.5 10823.5 10835.0 10836.5 10846.0 10847.0 10846.5 10848.0 10852.5 10854.0 10854.0 10854.5 10855.0 10857.0 GRCH 10691.0 10725.5 10736.0 10736.5 10770.0 10770.5 10797.0 10809.0 10818.5 10819.5 10824.0 10824.5 10836.0 10838.0 10855.5 10856.0 STOP DEPTH 10862.0 10874.0 (MEASURED DEPTH ) EQUIVALENT UNSHIFTED DEPTH -- SGMA 10692.0 10703.0 10703.5 10706.0 10709.5 10710.5 10711.5 10716.0 10716.5 10719.5 PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. 10864.5 10865.0 10865.5 $ REMARKS: 108 ,5 10868.0 10869.0 PDK PASS 3 - WELL FLOWING. LOGGED AT 10 FPM. CHOKE SET AT 30. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ? ?MATCH4A. OUT / ? ?MATCH4 B. OUT $ BP EXPLORATION (ALASKA) :H-07 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CSLS PDK 68 1 CU 4 6 LS PDK 68 1 CPS 4 7 SS PDK 68 1 CPS 4 8 MSD PDK 68 1 CU 4 9 RATO PDK 68 1 4 10 RBOR PDK 68 1 4 11 RICS PDK 68 1 4 12 RIN PDK 68 1 4 13 SGMA PDK 68 1 CU 4 14 SGMB PDK 68 1 CU 4 15 SGNT PDK 68 1 CU 4 16 PHI PDK 68 1 PU-S 4 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 64 * DATA RECORD (TYPE# 0) Total Data Records: 31 958 BYTES * Tape File Start Depth = 10665.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 35396 datums Tape Subfile: 4 106 records... Minimum record length: 62 bytes Maximum record length: 958 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10050.0 10050.0 BASELINE DEPTH 10053.5 10085.5 10089.0 10099.5 10100.5 10105.0 10105.5 10107.0 10116.0 10116.5 10119.5 10120.5 10122.5 10128.5 10131.0 10134.0 10134.5 10136.5 10141.5 10142.0 10147.0 10157.0 10157.5 10158.0 10160.5 10167.5 10182.0 10186.5 10190.0 10191.0 10194.5 10199.0 10199.5 10203.5 10204.5 10205.0 10212.5 GRCH 10054.0 10087.0 10136.0 10136.5 10141.5 10142.5 10147.5 10195.5 10213.5 STOP DEPTH 10858.0 10870.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 10090.5 10101.0 10101.5 10106.0 10107.0 10108.5 10116.5 10117.5 10120.5 10121.0 10123.0 10129.5 10132.0 10134.0 10147.0 10158.5 10159.0 10160.0 10162.5 10167.0 10181.5 10186.5 10190.0 10190.5 10198.5 10199.5 10203.5 10204.0 10205.0 10212.5 10213.0 10213.5 10229.5 10230.0 10231.0 10232.0 10234.0 10235.0 10239.0 10240.5 10241.0 10242.0 10242.5 10243.0 10244.0 10244.5 10245.0 10245.5 10246.5 10248.5 10249.5 10250.5 10251.0 10257.5 10258.5 10259.0 10260.0 10271.0 10273.0 10275.5 10281.5 10282.5 10294.0 10295.0 10311.0 10313.5 10329.0 10361.0 10375.5 10376.0 10376.5 10389.5 10390.5 10399.0 10405.5 10421.0 10426.5 10434.0 10435.0 10436.5 10440.0 10440.5 10445.5 10446.0 10448.5 10449.0 10449.5 10451.5 10490.5 10491.0 10214.0 10230.0 10231.0 10232.0 10232.5 10242.5 10243.5 10246.5 10247.0 10259.5 10260.0 10271.0 10272.5 10275.0 10422.0 10427.5 10437.0 10440.5 10441.5 10450.0 10452.0 10213.5 10234.5 10235.0 10239.0 10241.0 10241.5 10242.0 10243.0 10243.5 10245.0 10246.5 10247.5 10250.5 10251.0 10252.0 10253.0 10259.5 10260.0 10283.0 10283.5 10295.0 10295.5 10311.5 10314.5 10330.0 10361.5 10376.0 10376.5 10377.0 10390.0 10390.5 10399.0 10406.5 10435.0 10435.5 10446.0 10447.0 10449.5 10450.0 10491.0 10492.0 10494.0 10495.0 10498.5 10500.5 10506.5 10508.0 10512.5 10513.0 10521.5 10522.0 10540.0 10545.0 10550.0 10562.0 10563.0 10590.5 10591.5 10598.5 10604.0 10605.0 10605.5 10610.0 10616.0 10616.5 10617.5 10620.5 10629.5 10630.0 10630.5 10631.5 10652.5 10679.0 10680.0 10698.0 10698.5 10699.0 10704.0 10705.0 10707.0 10711.5 10712.5 10718.0 10720.5 10724.5 10729.5 10732.5 10733.0 10744.0 10745.0 10746.0 10754.0 10755.5 10768.5 10769.5 10770.5 10773.0 10773.5 10784.5 10795.5 10798.0 10498.5 10500.5 10541.0 10600.0 10611.5 10706.0 10712.5 10713.0 10721.0 10731.0 10734.0 10735.0 10745.0 10769.5 10770.0 10773.5 10774.5 10785.5 10495.0 10495.5 10507.0 10509.0 10513.5 10514.5 10523.0 10524.0 10547.0 10551.5 10563.5 10564.0 10591.5 10592.0 10604.5 10605.0 10605.5 10616.5 10617.0 10617.5 10620.5 10628.5 10629.0 10630.0 10631.0 10654.0 10680.5 10681.0 10699.0 10699.5 10700.0 10705.0 10709.5 10720.5 10726.0 10746.5 10747.0 10755.0 10757.0 10770.0 10770.5 10771.0 10796.0 10799.0 10809.0 10818.0 10826.5 10829.0 10830.0 10830.5 10831.0 10832.5 10833.5 10836.5 10841.0 10841.5 10845.0 10845.5 10846.5 10847.0 10849.0 10849.5 10852.5 10853.0 $ REMARKS: 10C .5 10818.5 10827.5 10837.5 10846.5 10847.0 10847.5 10848.5 10850.5 10851.0 10830.0 10830.5 10831.0 10832.0 10833.0 10834.5 10842.0 10843.0 10854.0 10854.5 BASE SEAWATER PASS. 25 BBLS SEAWATER IN FORMATION. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ? ?MATCH5A. OUT /??MATCH5B. OUT $ : BP EXPLORATION (ALASKA) :H-07 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 GRCH PDK 68 1 GAPI BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CSLS PDK 68 1 CU LS PDK 68 1 CPS SS PDK 68 1 CPS MSD PDK 68 1 CU RATO PDK 68 1 RBOR PDK 68 1 RICS PDK 68 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SGNT PDK 68 1 CU 16 PHI PDK 68 1 PU-S * DATA RECORD (TYPE# 0) Total Data Records: 119 64 958 BYTES * 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 4 51 995 99 Tape File Start Depth = 10045.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 36076 datums Tape Subfile: 5 331 records... Minimum record length: 62 bytes Maximum record length: 958 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10252.0 10252.0 STOP DEPTH 10858.0 10870.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10258.5 10259.0 10259.5 10269.5 10270.0 10270.5 10270.5 10271.0 10271.0 10273.5 10275.5 10274.5 10276.0 10281.5 10283.0 10282.5 10283.5 10302.5 10303.5 10304.0 10304.5 10310.5 10311.0 10311.0 10312.0 10320.0 10321.0 10320.5 10322.0 10350.0 10351.0 10352.5 10353.5 10363.0 10363.5 10376.0 10376.5 10376.5 10377.5 10378.0 10379.0 10379.0 10379.5 10379.5 10380.5 10382.5 10383.5 10385.0 10385.5 10400.0 10400.5 10402.0 10403.0 10408.0 10409.0 10410.5 10412.0 10415.0 10416.5 10416.0 10417.0 10423.0 10423.5 10425.0 10425.5 10425.5 10426.5 10430.0 10431.0 10431.0 10431.5 10436.0 10436.5 EQUIVALENT UNSHIFTED DEPTH SGMA 10260.5 10436.5 10437.0 10439.5 10440.0 10448.5 10449.5 10451.0 10459.0 10459.5 10460.5 10495.0 10504.0 1O505.O 10505.5 10512.5 10513.0 10513.5 10514.5 10521.5 10540.5 1O550.5 10551.5 10552.5 10553.0 10553.5 10557.0 10558.0 10561.0 10561.5 10563.5 10565.0 10584.0 10585.0 10591.0 10609.0 10610.0 10610.5 10615.0 10619.0 10629.0 10630.0 10630.5 10631.5 10706.5 10707.0 10709.0 10710.5 10711.5 10722.0 10726.0 10728.0 10729.0 10729.5 10731.0 10731.5 10733.0 10733.5 10734.0 10737.0 10762.5 10437.5 10440.0 10441.0 10449.5 10495.0 10504.0 10504.5 10505.0 10542.0 10610.5 10611.0 10611.5 10707.0 10707.5 10710.0 10711.5 10712.0 10722.5 10730.5 10732.0 10733.0 10734.5 10735.5 10736.0 10763.5 10437.5 10450.5 10451.5 10459.5 10460.5 10461.0 10506.0 10513.5 10514.0 10515.0 10516.0 10523.5 10552.5 10553.0 10554.0 10554.5 10555.0 10558.5 10559.0 10562.0 10563.0 10565.0 10566.0 10585.0 10585.5 10591.5 10615.0 10619.0 10627.5 10628.5 10629.5 10630.5 10727.5 10729.5 10730.0 10738.0 10815.0 10816.0 10818.0 10826.0 10831.0 10836.5 10837.0 10837.5 10839.5 10840.0 10845.5 10846.0 10849.5 10850.0 10851.5 10852.0 $ REMARKS: 10827.0 10832.5 10838.0 10838.5 10846.5 10847.5 10851.0 10851.5 10816.5 10817.5 10819.0 10838.0 10839.0 10841.0 10842.0 10853.5 10854.0 BORAX PASS 2. 35 BBLS BORAX IN FORMATION. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ??MATCH6A. OUT /??MATCH6B.OUT $ : BP EXPLORATION (ALASKA) : H- 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod GRCH PDK 68 1 GAPI 4 BIF PDK 68 1 4 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 4 LS PDK 68 1 CPS 4 SS PDK 68 1 CPS 4 MSD PDK 68 1 CU 4 RATO PDK 68 1 4 RBOR PDK 68 1 4 RICS PDK 68 1 4 RIN PDK 68 1 4 SGMA PDK 68 1 CU 4 SGMB PDK 68 1 CU 4 4 4 4 4 4 4 4 4 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 51 995 99 1 51 995 99 1 51 995 99 1 51 995 99 1 51 995 99 1 51 995 99 1 51 995 99 1 51 995 99 1 * DATA RECORD (TYPE# 0) Total Data Records: 79 966 BYTES * 5~ Tape File Start Depth = 10250.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 54162 datums Tape Subfile: 6 227 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE START DEPTH GRCH 10500.0 PDK 10500.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH 10506.0 10510.5 10512.5 10514.5 10515.5 10522.5 10523.0 10545.5 10547.0 10562.0 10565.5 10571.0 10572.0 10591.5 10598.5 10600.0 10604.5 10605.5 10606.5 10610.0 10614.5 10617.5 10618.5 10620.0 10627.5 10630.5 10631.0 10631.5 10652.0 10670.5 10680.0 10684.5 10694.0 10705.5 10709.0 10710.5 10717.5 GRCH 10599.5 10611.0 10709.5 for each pass in separate files. STOP DEPTH 10858.0 10870.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 10506.5 10511.0 10513.5 10515.5 10517.0 10524.0 10525.0 10547.5 10548.5 10563.5 10566.5 10572.0 10572.5 10592.0 10600.0 10604.5 10605.0 10606.0 10614.5 10617.5 10618.0 10619.5 10626.0 10629.0 10630.0 10630.5 10652.0 10670.5 10680.0 10684.5 10694.5 10706.0 10713.0 10720.0 10719.5 10720.0 10722.5 10724.0 10727.0 10728.0 10729.5 10732.5 10733.0 10734.0 10735.5 10736.5 10765.0 10775.0 10775.5 10784.0 10810.5 10816.5 10830.0 10830.5 10831.0 10836.5 10837.5 10838.0 10842.0 10845.5 10846.5 10847.0 10849.5 10850.0 10850.5 10851.5 10853.5 10854.0 $ REMARKS: 10720.5 10730.5 10733.5 10734.5 10735.5 10765.5 10775.5 10776.5 10785.0 10811.0 10817.0 10832.0 10837.5 10838.0 10842.5 10846.5 10847.5 10848.5 10851.0 10851.5 10721.5 10724.5 10725.5 10728.5 10729.0 10736.5 10737.0 10830.5 10831.5 10838.5 10839.5 10852.0 10852.5 10854.5 10855.0 BORAX PASS 3. 55 BBLS BORAX IN FORMATION. ALL PDK CURVES WERE SHIFTED WITH SGMA. / ? ?MATCH7A. OUT /??MATCH7B. OUT $ CN : BP EXPLORATION WN : H - 07 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: (ALASKA) API API API API Name Tool Code Samples Units 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 SS PDK 68 1 CPS 8 MSD PDK 68 1 CU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU Log Crv Crv Size Length Typ Typ Cls Mod 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 56 * DATA RECORD (TYPE# 0) Total Data Records: 48 966 BYTES * Tape File Start Depth = 10495.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 47492 datums Tape Subfile: 7 154 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10600.0 10600.0 BASELINE DEPTH GRCH 10603.5 10604.5 10613.5 10629.5 10630.5 10631.5 10671.0 10677.0 10685.5 10693.5 10698.5 10705.5 10708.0 10709.0 10709.0 10709.5 10717.0 10721.5 10722.0 10724.5 10727.0 10728.0 10729.0 10729.5 10731.0 10732.5 10734.0 10733.0 10735.0 10734.5 10736.5 10744.0 10745.0 10764.0 10764.5 10775.0 10775.5 10777.5 10778.5 10823.0 10823.5 10824.5 10824.5 10826.0 10826.5 10829.5 10830.0 10837.0 10837.5 10838.5 10839.5 10839.5 10840.0 STOP DEPTH 10858.0 10870.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 10613.5 10629.5 10630.0 10631.0 10671.0 10677.0 10685.5 10694.5 10699.5 10705.5 10718.0 10723.0 10726.5 10728.5 10729.5 10730.0 10824.0 10825.0 10830.0 10831.0 10840.5 10841.5 10842.0 10842.5 10843.0 10845.0 10845.5 10846.5 10847.0 10850.0 10852.5 10853.5 10858.0 10858.5 10865.0 10865.5 $ REMARKS: 10843.5 10843.5 10844.0 10846.5 10847.0 10847.5 10848.5 10851.5 10853.5 10854.0 10858.5 10859.0 10864.0 10864.5 BORAX PASS 4. 62 BBLS BORAX IN FORMATION. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ? ?MATCH8A. OUT / ? ?MATCHSB. OUT $ : BP EXPLORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 GRCH PDK 68 1 GAPI BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CSLS PDK 68 1 CU LS PDK 68 1 CPS SS PDK 68 1 CPS MSD PDK 68 1 CU RATO PDK 68 1 RBOR PDK 68 1 RICS PDK 68 1 RIN PDK 68 1 SGMA PDK 68 1 CU SGMB PDK 68 1 CU 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 56 * DATA RECORD (TY # 0) Total Data Records: 36 966 BYTES * Tape File Start Depth = 10595.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 62578 datums Tape Subfile: 8 122 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10588.0 10600.0 STOP DEPTH 10858.0 10870.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10599.0 10600.0 10604.5 10605.0 10606.0 10610.0 10611.0 10619.5 10620.5 10631.5 10667.5 10681.5 10682.0 10697.5 10705.0 10717.5 10720.0 10720.5 10725.5 10729.5 10731.0 10733.5 10735.0 10738.5 10760.5 10761.0 10761.5 10771.5 10772.0 10773.0 10773.0 10773.5 10774.0 10784.5 10785.0 10809.5 10809.5 10818.0 10818.0 10821.0 10821.5 10821.5 10822.5 10823.0 10824.0 10823.5 10828.0 10828.5 10830.0 10830.5 10831.0 10837.5 10838.0 10838.0 10838.5 10839.5 in separate files. EQUIVALENT UNSHIFTED DEPTH SGMA 10604.5 10605.0 10605.5 10619.0 10619.5 10630.5 10667.0 10697.5 10705.5 10718.0 10726.0 10739.0 10761.5 10822.0 10824.0 10829.0 10830.0 10831.5 10840.0 10841.0 10841.5 10842.0 10842.5 10843.0 10845.5 10846.0 10847.5 10848.0 10849.0 10849.5 10853.0 10862.0 10862.5 10863.0 $ REMARKS: 10842.5 10843.0 10846.5 10847.5 10849.0 10850.0 10851.0 10851.5 10843.0 10843.5 10844.0 10854.0 10862.5 10863.0 10863.5 BORAX PASS 5. 25 BBLS SEAWATER FLUSHED INTO FORMATION. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ? ?MATCH9A. OUT / ? ?MATCH9 B. OUT $ : BP EXPLORATION (ALASKA) :H-07 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 GRCH PDK 68 1 GAPI 4 BIF PDK 68 1 4 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 4 LS PDK 68 1 CPS 4 SS PDK 68 1 CPS 4 MSD PDK 68 1 CU 4 RATO PDK 68 1 4 RBOR PDK 68 1 4 RICS PDK 68 1 4 RIN PDK 68 1 4 SGMA PDK 68 1 CU 4 SGMB PDK 68 1 CU 4 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 4 51 995 99 1 4 51 995 99 1 56 * DATA RECORD (TYPE# 0) Total Data Records: 37 966 BYTES * Tape File Start Depth = 10585.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 56208 datums Tape Subfile: 9 124 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 0 DEPTH INCREMENT: .5000 FILE SUMMARY LDWG TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10050.0 10050.0 STOP DEPTH 10862.0 10874.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10045.0 10045.0 10053.5 10054.0 10083.5 10086.0 10084.0 10086.5 10099.5 10100.5 10100.0 10101.0 10101.0 10101.5 10104.5 10105.0 10105.5 10105.5 10106.0 10106.0 10106.5 10107.0 10135.5 10136.0 10136.5 10136.5 10145.0 10145.0 10146.0 10145.5 10146.5 10146.5 10156.0 10156.0 10165.5 10167.0 10167.0 10168.5 10170.0 10170.0 10170.5 10170.5 10171.5 10171.0 10179.5 10180.0 10209.5 10210.0 10210.0 10211.0 10211.5 10212.5 10212.5 10213.0 10217.0 10217.5 10224.5 10224.5 10242.5 10243.5 10246.0 10247.0 10247.0 10247.5 10248.0 10248.5 10258.0 10258.0 10259.5 10259.5 10260.5 10260.0 10269.0 10268.5 in separate files. EQUIVALENT UNSHIFTED DEPTH 10270.0 10271.0 10273.5 10282.0 10398.5 10414.0 10414.5 10415.5 10416.5 10427.5 10435.0 10435.5 10436.5 10437.0 10438.0 10438.5 10439.0 10445.0 10446.0 10449.5 10465.5 10470.0 10498.5 10503.0 10504.0 10506.0 10534.5 10535.5 10543.5 10545.5 10549.0 10551.5 10709.0 10709.5 10710.5 10712.0 10713.0 10721.0 10721.5 10735.5 10736.5 10765.5 10838.5 10841.5 10842.5 10843.0 10846.5 10847.0 10852.0 10852.5 10054.0 10875.0 $ REMARKS: 1026.~0 10270.0 10274.0 10282.5 10397.5 10415.0 10415.5 10416.0 10416.5 10427.5 10436.0 10436.5 10437.0 10437.5 10438.0 10438.5 10439.5 10445.5 10446.0 10449.5 10466.0 10470.5 10498.5 10503.0 10503.5 10505.5 10536.0 10537.0 10544.5 10546.5 10549.5 10552.0 10710.5 10711.0 10711.5 10713.0 10713.5 10721.5 10722.5 10736.5 10737.0 10766.0 10839.5 10842.5 10843.0 10844.0 10847.5 10848.5 10853.5 10854.0 10054.5 10875.0 BACKGROUND GR PASS - SOURCE OFF. WELL FLOWING. LOGGED AFTER PDK PASS 3. BKS & BKL WERE SHIFTED WITH GRCH. /??MATCH1A.OUT CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 3 Curves: Name Tool Code Samples Units 1 GRCH PDK 68 1 GAPI 2 BKL PDK 68 1 CPS 3 BKS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 12 * DATA RECORD (TYPE# 0) Total Data Records: 27 1014 BYTES * Tape File Start Depth = 10045.000000 Tape File End Depth = 10875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 69223 datums Tape Subfile: 10 150 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10050.0 PDK 10050.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): roo coo , SWIV SWIVEL SUB PDK PDK-IO0 CCL TEMP $ STOP DEPTH 10873.0 10885.0 CASING COLLAR LOC. TEMPERATURE 25-AUG-95 FSYS REV. J001 VER. 1.1 1429 24-AUG-95 11017.0 10886.0 10050.0 10874.0 900.0 YES TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING .rNDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 700 FAR COUNT RATE HIGH SCALE (CPS) : 4200 NEAR COUNT RATE LOW SCALE (CPS): 12000 NEAR COUNT RATE HIGH SCALE (CPS) : 72000 TOOL STANDOFF (IN): .0 PDK PASS 1 - WELL FLOWING. LOGGED AT 15 TO 20 FPM. CHOKE SET AT 30. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 21 SGNT PDK 68 1 CU 4 22 PHI PDK 68 1 PU-S 4 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 O1 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 4 51 995 99 1 4 51 995 99 1 88 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 309 Tape File Start Depth = 10042.000000 Tape File End Depth = 10890.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 134248 datums Tape Subfile: 11 386 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 12 is type: LIS FILE HEADER FILE NUMBER: 11 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS UMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10642.0 PDK 10642.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10874.0 10886.0 25-AUG-95 FSYS REV. J001 VER. 1.1 1654 24-AUG-95 11017.0 10886.0 10050.0 10874.0 600.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE ~nND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 700 FAR COUNT RATE HIGH SCALE (CPS): 4200 NEAR COUNT RATE LOW SCALE (CPS): 12000 NEAR COUNT RATE HIGH SCALE (CPS) : 72000 TOOL STANDOFF (IN): .0 REMARKS: PDK PASS 2 - WELL FLOWING. LOGGED AT 10 FPM. CHOKE SET AT 30. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H- 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 21 SGNT PDK 68 1 CU 4 22 PHI PDK 68 1 PU-S 4 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 01 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 4 51 995 99 1 4 51 995 99 1 88 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 91 Tape File Start Depth = 10641.000000 Tape File End Depth = 10890.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 92155 datums Tape Subfile: 12 168 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 13 is type: LIS FILE HEADER FILE NUMBER: 12 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10663.5 PDK 10675.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10874.0 10886.0 25-AUG-95 FSYS REV. JO01 VER. 1.1 1732 24-AUG-95 11017.0 10886.0 1O050.0 10874.0 600.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS) : TOOL STANDOFF (IN): 700 4200 12000 72000 .0 REMARKS: PDK PASS 3 - WELL FLOWING. LOGGED AT 10 FPM. CHOKE SET AT 30. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 21 SGNT PDK 68 1 CU 4 22 PHI PDK 68 1 PU-S 4 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 01 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 4 51 995 99 1 4 51 995 99 1 88 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records~ 91 Tape File Start Depth = 10642.000000 Tape File End Depth = 10890.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 157088 datums Tape Subfile: 13 168 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 14 is type: LIS FILE HEADER FILE NUMBER: 13 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10050.0 PDK 10050.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10875.5 10887.5 25-AUG-95 FSYS REV. J001 VER. 1.1 2259 24-AUG-95 11017.0 10886.0 1005O.0 10874.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PDK PDK-100 CENT CENTRALI Z ER CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): SEAWATER/BORAX .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RAT~ NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 350 FAR COUNT RATE HIGH SCALE (CPS): 3850 NEAR COUNT RATE LOW SCALE (CPS) : 12000 NEAR COUNT RATE HIGH SCALE (CPS): 72000 TOOL STANDOFF (IN): .0 BASE SEAWATER PASS. 25 BBLS SEAWATER IN FORMATION. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 21 SGNT PDK 68 1 CU 4 22 PHI PDK 68 1 PU-S 4 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 01 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 4 51 995 99 1 4 51 995 99 1 88 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 312 Tape File Start Depth = 10035.000000 Tape File End Depth = 10891.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 170931 datums Tape Subfile: 14 390 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 15 is type: LIS FILE HEADER FILE NUMBER: 14 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 5 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10246.0 PDK 10246.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10877.0 10889.0 25-AUG-95 FSYS REV. J001 VER. 1.1 102 25-AUG-95 11017.0 10886.0 10050.0 10874.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PDK PDK-100 CENT CENTRALIZER CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): SEAWATER/BORAX .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATL NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEF~R FAR COUNT RATE LOW SCALE (CPS): 350 FAR COUNT RATE HIGH SCALE (CPS): 3850 NEAR COUNT RATE LOW SCALE (CPS): 12000 NEAR COUNT RATE HIGH SCALE (CPS): 72000 TOOL STANDOFF (IN): .0 REMARKS: BORAX PASS 2. 35 BBLS BORAX IN FORMATION. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 GR PDK 68 1 4 4 51 310 01 1 BIF PDK 68 1 4 4 51 995 99 1 BKL PDK 68 1 CPS 4 4 51 391 51 1 BKS PDK 68 1 CPS 4 4 51 390 51 1 CCL PDK 68 1 4 4 51 150 01 1 CSLS PDK 68 1 CU 4 4 51 995 99 1 CSS PDK 68 1 CPS 4 4 51 995 99 1 ISS PDK 68 1 CPS 4 4 51 995 99 1 LS PDK 68 1 CPS 4 4 51 391 99 1 SS PDK 68 1 CPS 4 4 51 390 99 1 MON PDK 68 1 CPS 4 4 51 430 01 1 MSD PDK 68 1 CU 4 4 51 995 99 1 RATO PDK 68 1 4 4 51 420 99 1 RBOR PDK 68 1 4 4 51 420 99 1 RICS PDK 68 1 4 4 51 420 99 1 RIN PDK 68 1 4 4 51 420 99 1 SGF~A PDK 68 1 CU 4 4 51 400 01 1 SGMB PDK 68 1 CU 4 4 51 995 99 1 SPD PDK 68 1 F/MN 4 4 51 636 99 1 TEN PDK 68 1 LB 4 4 51 635 99 1 80 GAPI * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 217 Tape File Start Depth = 10244.000000 Tape File End Depth = 10893.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 211626 datums Tape Subfile: 15 295 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 16 is type: LIS FILE HEADER FILE NUMBER: 15 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 6 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10500.0 PDK 10500.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10878.0 10890.0 25-AUG-95 FSYS REV. J001 VER. 1.1 147 25-AUG-95 11017.0 10886.0 10050.0 10874.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PDK PDK-100 CENT CENTRALIZER CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .00O 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): SEAWATER/BORAX .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RA% NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 350 FAR COUNT RATE HIGH SCALE (CPS): 3850 NEAR COUNT RATE LOW SCALE (CPS) : 12000 NEAR COUNT RATE HIGH SCALE (CPS) : 72000 TOOL STANDOFF (IN): .0 REMARKS: BORAX PASS 3. 55 BBLS BORAX IN FORMATION. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 GAPI 4 51 310 01 4 51 995 99 4 51 391 51 4 51 390 51 4 51 150 01 4 51 995 99 4 51 995 99 4 51 995 99 4 51 391 99 4 51 390 99 4 51 430 01 4 51 995 99 4 51 420 99 4 51 420 99 4 51 420 99 4 51 420 99 4 51 400 01 4 51 995 99 4 51 636 99 4 51 635 99 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 80 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 132 Tape File Start Depth = 10501.000000 Tape File End Depth = 10894.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 203965 datums Tape Subfile: 16 210 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 17 is type: LIS FILE HEADER FILE NUMBER: 16 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 7 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10598.0 PDK 10598.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10878.0 10890.0 25-AUG-95 FSYS REV. J001 VER. 1.1 217 25-AUG-95 11017.0 10886.0 10O50.0 10874.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PDK PDK-100 CENT CENTRALIZER CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): S EAWAT ER / BORAX .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RA5 NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 350 FAR COUNT RATE HIGH SCALE (CPS): 3850 NEAR COUNT RATE LOW SCALE (CPS): 12000 NEAR COUNT RATE HIGH SCALE (CPS): 72000 TOOL STANDOFF (IN): .0 REMARKS: BORAX PASS 4. 62 BBLS BORAX IN FORMATION. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H- 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 4 51 310 01 4 51 995 99 4 51 391 51 4 51 390 51 4 51 150 01 4 51 995 99 4 51 995 99 4 51 995 99 4 51 391 99 4 51 390 99 4 51 430 01 4 51 995 99 4 51 420 99 4 51 420 99 4 51 420 99 4 51 420 99 4 51 400 01 4 51 995 99 4 51 636 99 4 51 635 99 80 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 99 Tape File Start Depth = 10597.000000 Tape File End Depth = 10893.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 236512 datums Tape Subfile: 17 177 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 18 is type: LIS FILE HEADER FILE NUMBER: 17 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 8 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10581.0 PDK 10581.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10877.0 10889.0 25-AUG-95 FSYS REV. J001 VER. 1.1 240 25-AUG-95 11017.0 10886.0 10050.0 10874.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PDK PDK-100 CENT CENTRALI Z ER CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): SEAWATER/BORAX .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RA~ NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 350 FAR COUNT RATE HIGH SCALE (CPS): 3850 NEAR COUNT RATE LOW SCALE (CPS): 12000 NEAR COUNT RATE HIGH SCALE (CPS): 72000 TOOL STANDOFF (IN): .0 REMARKS: BORAX PASS 5. 25 BBLS SEAWATER FLUSHED INTO FORMATION. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H- 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CCL PDK 68 1 6 CSLS PDK 68 1 CU 7 CSS PDK 68 1 CPS $ ISS PDK 68 1 CPS 9 LS PDK 68 1 CPS 10 SS PDK 68 1 CPS 11 MON PDK 68 1 CPS 12 MSD PDK 68 1 CU 13 RATO PDK 68 1 14 RBOR PDK 68 1 15 RICS PDK 68 1 16 RIN PDK 68 1 17 SGMA PDK 68 1 CU 18 SGMB PDK 68 1 CU 19 SPD PDK 68 1 F/MN 20 TEN PDK 68 1 LB 4 4 51 310 01 1 4 4 51 995 99 1 4 4 51 391 51 1 4 4 51 390 51 1 4 4 51 150 01 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 391 99 1 4 4 51 390 99 1 4 4 51 430 01 1 4 4 51 995 99 1 4 4 51 420 99 1 4 4 51 420 99 1 4 4 51 420 99 1 4 4 51 420 99 1 4 4 51 400 01 1 4 4 51 995 99 1 4 4 51 636 99 1 4 4 51 635 99 1 80 * DATA RECORD (TYPE# 0) Total Data Records: 105 1014 BYTES * Tape File Start Depth = 10580.000000 Tape File End Depth = 10893.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 230279 datums Tape Subfile: 18 183 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 19 is type: LIS FILE HEADER FILE NUMBER: 18 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 0 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10050.0 PDK 10050.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10874.0 10886.0 25-AUG-95 FSYS REV. J001 VER. 1.1 1819 24-AUG-95 11017.0 10886.0 10050.0 10874.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 3913NA 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 11058.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 218.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZIN~ ;INDOW (FT): BASE NORI~LIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 0 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 0 TOOL STANDOFF (IN): .0 REMARKS: BACKGROUND GR PASS - SOURCE OFF. WELL FLOWING. LOGGED AFTER PDK PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : H - 07 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 2 BKL PDK 68 3 BKS PDK 68 4 CCL PDK 68 5 SPD PDK 68 6 TEN PDK 68 1 GAPI 1 CPS 1 CPS 1 1 F/MN 1 LB 4 4 51 310 01 1 4 4 51 391 51 1 4 4 51 390 51 1 4 4 51 150 01 1 4 4 51 636 99 1 4 4 51 635 99 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 95 Tape File Start Depth = 10890.000000 Tape File End Depth = 10041.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 260292 datums Tape Subfile: 19 171 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 20 is type: LIS 95/ 8/25 01 **** REEL TRAILER **** 95/ 8/29 01 Tape Subfile: 20 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 29 AUG 95 4:07p Elapsed execution time = 8.30 seconds. SYSTEM RETURN CODE = 0