Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutColville River - ConocoPhillips Alaska Inc.State of Alaska AOGCC Gas Disposition Files Year: 2017 Facility: Colville River Unit Processing Operator: ConocoPhillips Alaska, Inc.   STATE OF ALASKA nin FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 103000001 7 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. Month/Year of Disposition January -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 42,240 Pool Name Pool Code Percent 7. Reinjected 1,819,264 ALPINE 120100 56.9% FIORD 120120 36.4% 8. Flared or vented 1 hour or less 2,019 NANUQ 120175 2.8% NANUQ-KUPARUK 120100 3.0% 9. Flared or vented more than 1 hour (see instr.) 0 QANNIK 120180 0.9% OTHER 120180 0.0% 10. Pilot and Purge 6,754 11, Assist Gas 00.0% 12. Fuel gas used in lease operations. 492,132 13. Other (see instructions) Official Use Only Authorization 11 hr Safety MCF 14. TOTAL VOLUME (ITEMS 6.73) 2,362.409 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: Gas sold to Alpine Transportation Company = 27,922 Gas gifted to Village of Nuiqsut =14,318 1 hereby certify that the foregoing is true and correct to the best of my knowledge. AG(� Signature: yY Li2G�l�C./P-2B Title: Revenue & Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60°F. Authority 20 AAC25.235. Printed Name: Diane Hendrickson Phone: Date: February 20, 2017 Form 10-422 Rev. S/2009 INSTRUCrIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO.663 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Jan -17 Total Flare > 1 Hour 0 Total Flare <=1 Hour 2.019 Pilot aaU P.M. 6,754 Total Flare 8,773 STATE OF ALASKA nin FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1030000017 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. Month/Vear of Disposition February -17 Disposition Volume MCF 20. Forproduction from multiple pools. list contribution of each pool as a percent of Total Volume. 6. Sold 37,974 Pool Name Pool Code Percent 7. Reinjected 1.576,827 ALPINE 120100 56.87% FIORD 120120 35.3% 8. Flared or vented 1 hour or less 1,663 NANUO 120175 3.0% NANUO-KUPARUK 120100 3.6% 9. Flared or vented more than 1 hour (see instr.) 21,520 OANNIK 120180 1.4% OTHER 120180 0.0% 10. Pilot and Purge 8,481 11. Assist Gas 00.0% 12. Fuel gas used in lease operations. 438,799 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety 2 J 52-C MCF 14. TOTAL VOLUME (ITEMS 6.13) 2,085,264 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 4-5-/ 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: Gas sold to Alpine Transportation Company = 24,388 Gas gifted to Village of Nuiqsut =13,586 1 hereby certify that the foregoing is true and correct to the best of my knov ledge. nature: ��^Y%L^ Title: Revenue & Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60'F. Authority 20 AAC25.235. rPrg,nted Name. Diane Hendrickson Phone: Date: March 20, 2017 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate ✓TL 4/4117 - CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Feb47 START END PLANNED VOLUME DATE TIME DATE TIME UNPLANNED MSCF DESCRIPTION OF FLARING EVENT ACTION TAKEN TO MINIMIZE VOLUME The TIC#33012-TB combustion system developed a leak requirvlg an 02/07/2017 13:37 02/08/2017 03:52 PLANNED 21261 emergency shutdown to inspect. Upon inspection, it was discovered The fuel gas noule assembly was repaired and reinstalled the fuel gas noale had to be replaced. The Low Pressure compressor tripped off line due to a faulty pressure Instrument technicians corrected the issue wfth me faulty 02/08/2017 2028 02/08/2017 21:41 PLANNED 259 transmitter while the facility was in late stages of a restart transmitter allowing the compressor to be returned to service 2115e) Toted Ram >1 Hour 21,520 Total Flare <=1 Hour 1863 Pilotam/Purge 8,481 Total Flare 31.664 Alpine Environmental From: Alaska SCADA <AlaskaSCADA@cop.com> Sent: Wednesday, February 08, 2017 3:55 AM To: ALP SCADA Analyst; Alpine Lead Operators; NSK Env Coord Air Quality & Spill Plans; Alpine Environmental; ALP Automation Subject: # ALPINE SCADA: Reportable LP Flare Event IP21 has recorded a reportable LP Flare event Flare Event Number: 1634 Flare Event Started: 07 -FEB -17 13:47:00.0 Flare Event Ended: 08 -FEB -17 03:51:53.8 Flare Event Duration: 14 Hours, 4 Minutes, 53.8 Seconds Flare Event Volume: 4501.09 (MSCF) Go to IP21 Flare Event History display (FLAREHLP) for more details. This email was generated by SQL: FLR_Event on 08 -FEB -17 03:54:28.2 GAS FLARING or VENTING REPORT - CONOCOPHILLIPS ALASKA, INC. FACILITY: Alpine Central Facility AIR PERMIT NUMBER: AQ0489TVP02 GAS DISPOSITION Date of Occurrence: 2/7/2017 dere ❑rent Time of Occurrence: 00_0024100 HH,MM (mm/dd/yy) (Check Selection) From: 13:41 To: 00__00 = 10:13 Total Volume Flared or Vented: 4501 MSCF BELS From: 00:00 To:. 52 = 03:52 Planned ❑+ Unplanned ❑ From: To: From: To: - Meter N0: 35012 (By Facility) Total Minutes Flared or Varied 845 minutes (Includes volume flared which generated black smoke. If applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the Incident) X S/D T/CH 33012 -TB for vee beim Process upset In TIC SD due to high exhaust temperature section of facility X EMERGENCY SHUTDOWN Flaring for drillaile shutdown/startup Electrical/ Instrumentation malfunction Flare system testing ExcessivalmauPieient inlet gas rates into nullity Faulty shutdown on SID on high vibration Facility Maintenance v 011ier: Comments: The T/Ca 33012 -Ta mmhuseon system tlevelopetl a ;a;:i en emsrgentysM1Ntlown W Paped. Upon inspallon, it was d'acovemtl the fuel0o noule hatl to De replaced. B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) X Started 1 reatarted TIC # 33m2 -Ta Stabilized facility process and operation Com ressor/traindepressured X Repaired equipment difficulties X Redticetl t% increased Inlet gas rates with fuel gas mules Completed flare testing Facility maintenance completed Corrected E81 fluctuation / failure Other. Comments: The fuel gas nozzle assembly was repaired and reinstalled. C. Flaring or Venting was: (Check one) necessary for facility operations, repairs, upgrades, or testing procedures ❑ an emergency that threatened life or property ❑ necessary to Eftent loss of ultimate recovery Venting Incident ❑ No: ❑ (If Yes, complete form & contact Environmental immediately) Was the volume over 1,000 mecf? Yes: Flare =dent TRUE Did Incident last for longer than 1 hour? Yes [7 No ❑ If Yea, fax this report to Environmental within 24 hours at KRU-669-7712 or ALP at 670.45D7 Did event cause any smoke' > 5 minutes in 2 hr or 20% opacity for 6 consecutive minutes? Yes: E]No: 0 If Yea, contact Envimmental Immediately KRU 669-7242 or ALP 670-4200 and fax this report to Env at KRU- 659-7712 or ALP at 670.4607 (enter tag number and description) Black smoke' emitted from source: Date and time of black smoke' event: From: T° MSCF Volume flared which generated black smoke': _BELS Description of steps to minimize emissions: (Section B above) Material flared: Gas: NGLs: Other: General Weather: Air Temperature: Wind Speed/Dlmction: ' Observation by Non -Certified Visible Emission Observer Based on Information and belief formed after reasonable Inquiry, I certify that the statements and Information In and attached to this document are true, accurate and complete..--,[p''',J/ Q Date �, I Facility Supervisor L- V —moi 1 cc: Alpine: Field Environmental Compliance Coordinators, n1838 or ALP -14 Kupamk: Field Environmental Compliance Coordlnaers, n1037 or NSK- 61 020717 LP Fbro GF end VR repwUh 2/8.1017 Alpine Environmental ` � � ) From: Alaska SCADA <AlaskaSCADA@cop.com> Sent: Wednesday, February 08, 2017 3:54 AM To: ALP SCADA Analyst; Alpine Lead Operators; NSK Env Coord Air Quality & Spill Plans; Alpine Environmental; ALP Automation Subject: # ALPINE SCADA: Reportable HP Flare Event IP21 has recorded a reportable HP Flare event Flare Event Number: 87 Flare Event Started: 07 -FEB -17 13:47:00.0 Flare Event Ended: 08 -FEB -17 03:51:53.8 Flare Event Duration: 14 Hours, 4 Minutes, 53.8 Seconds Flare Event Volume: 16760.4 (MSCF) Go to IP21 Flare Event History display (FLAREHHP) for more details. This email was generated by SQL: FLR_Event on 08 -FEB -17 03:54:17.1 GAS FLARING or VENTING REPORT -CONOCOPHILLIPS ALASKA, INC. FACILITY: Alpine Central FaClIlty AIR PERMIT NUMBER: AQD489TVP02 GAS DISPOSITION Data of occurrence: 2812017 owne ❑yam Time of Occurrence: 00_00 24:00 HH:MM (m ucia W) (Check Selection) From: 13:47 To: 00:00 10:13 Total Volume Flared or vented: 16760_MSCF BELS From: 00:00 To: 03_52 = 03:52 Planned ❑+ Unplanned ❑ From: To: ,_. From: To: Meter No: 35011 By Facility) Total Minutes Flared or Vented = B45minulas (Includes volume flared which generated black smoke, 9 applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the Incident) X SIO TIC# 3301?TB for see bebv: Process upset in TIC SD due to high exhaust temperature section of facility X EMERGENCY SHUTDOWN Flaring for ddllsite shutdown/startup Elect ical I Instvnentalion mallunction Flare system testing Excessrvelinsufgclenl inlet gas rates into facility Faulty shutdown on SID on high vibration Facility Maintenance Other: Comments: Tne TICa 33012 -TB camIOU sllon system devebped a leak rewiring an emergency aeuttlown to In%pest. Upgn Mcpedlan, itwas tliscoveree 1M1e (uN gas norzla M1ad to be rcplaud. E. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) X Started / restarted T/C R 33o1] -Te Stabilized facility process and operation Compressor/ train depressured X Repaired equipment difficulties X EI---_ with fuel gas nozzles R -Wu- Increased inlet gas rales Facility maintenance completed Completed flare testing Corrected E&I fluctuation / failure Other: Comments: The Fuel gas nozzle assemhly was repaired and reinstalled. C. Flaring or Venting was: (Check one) ❑ an emergency that threatened fife or property ❑+ necessary for facility opera lons, repairs, upgrade&, or testing procedures ❑ necessary to prevent lose of ultimate recove VeatlnD Incldent ❑ No: ❑ (If yes, complete form & contact Environmental Immediately) Was the volume over 1,000 m9cf7 Yes: Flare Incident TRUE Did Incident last for longer than 1 hour? Yes ❑+ No ❑ If Yes, fax this report to Environmental within 24 hours at KRU- 669.7712 or ALP at 670-4607 Did event cause any smoke' > 5 minutes In 2 hr or 20% opacity for 6 consecutive minutes? Yes: ❑ No: ❑+ If Yes, contact E vin me tal Immediately KRU 659.7242 or ALP 870-4200 and fax this report to Env at KRU- 659-7712 or ALP at 670-4607 (enter tag number and description) Black smoke' emitted from source: T° Date and time of black smoke' event. From: MSCF _RBCS Volume tiered which generated black smoke': Descriptlon of steps to minimize emissions: (Section B above) Materiel flared: Gas; NGLs: Other: General Weather: Air Temperature: Wind Speed/Direction: • Observation by Non -Certified Visible Emission Observer Based on Information and belief formed after reasonable inquiry. I certify that the statements and Information In and attached to this document are true, accurate and complete. �.- ,r� ,-a 9 ,.. � Date G.1 `111 LI Facility Supervisor �!`'�SL�/ oc: Alpine: Field Environmental Compliance Coordinators, n1838 or ALP -14 Kupeauk: Field Environmental Compliance Coordinators, nl037 or NSK-61 W0717 HP Flare OF erel VR repen.xis bw2m7 STATE OF ALASKA nin FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1 03 000001 7 12. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. Month/Year of Disposition Manch-17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 42,909 Pool Name Pool Coda Percent 7. Reinjected 1,888,992 ALPINE 120100 62.9% FIORD 120120 29.8% 8. Flared or vented i hour or less 47 NANUO 120175 2.6% NANUO-KUPARUK 120100 3.1% 9. Flared or vented more than i hour (see Instr.) 0 OANNIK 120180 1.6%OTHER 120180 0.0% 10. Pilot and Purge 7,102 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 498,806 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 2,437,856 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: Gas sold to Alpine Transportation Company = 28,617 Gas gifted to Village of Nuiqsut =14,292 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: v �'a� ��� Title: Revenue & Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60°F. Authority 20 AAC25.235. Printed Name: Diane Hendrickson Phone: Date: April 20, 2017 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO.443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Mar -9 DATE START TIME END DATE TIME PLANNED UNPLANNED VOLUME MSCF DESCRIPTION OF FLARING EVENT ACTION TAKEN TO MINIMIZE VOLUME Total Flare = t Hour 0 Trial Flare <= f Hovr 47 Pilot And Pw,. 7,102 Total Flare 7,148 STATE OF ALASKA nin FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1030000017 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator 5. Month/Year of Disposition CONOCOPHILLIPS ALASKA, INC. April -17 Disposition Volume MCF 20. For production hom multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 41,667 Pool Name Pool Code Percent 7. Reinjected 17792,238 ALPINE 120100 69.9% FIORD 120120 22.4% 8. Flared or vented 1 hour or less 683 NANUO 120175 2.83% NANUO-KUPARUK 120100 3.1% 9. Flared or vented more than 1 hour (see instr.) 0 QANNIK 120180 1.8% OTHER 120180 0.0% 10. Pilot and Purge 8,048 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 460,148 13. Other (see instructions) Official Use Only Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 2,302,784 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: Gas sold to Alpine Transportation Company = 29,060 Gas gifted to Village of Nuigsut =12,607 1 hereby certify that the foregoing is two and correct to the best of my knowledge. �� Signature: Ni Title: Revenue 8 Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60°F. Authority 20 AAC25.235. Printed Name: Diane Hendrickson Phone: Date: May 20, 2017 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Apr -1T Total Flare > 1 Hour Total Flare — I Hour 683 Pilot and Pmge 8 M Total Flare 8731 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 103000001 7 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator 5. Monthlyear of Disposition CONOCOPHILLIPS ALASKA, INC. May -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. & Sold 40,400 Pool Name Pool Code Percent 7. Reinjected 7892,688 ALPINE 120100 72.9% FIORD 120120 18.8% 8. Flared or vented 1 hour or less 10,112 NANUQ 120175 2.8% NANUQ-KUPARUK 120100 3.6% 9. Flared or vented more Than 1 hour (see instr.) 0 QANNIK 120180 1.9%OTHER Undefined 0.0% 10. Pilot and Purge 11,911 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 453,414 13. Other (see instructions) Official Use Only Authorization >l hr: Safety MCF 14. TOTAL VOLUME (ITEMS 611 3) 2,408.525 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: Date 18. Transferred to: (Express as a negative #) 19. Remarks: Gas sold to Alpine Transportation Company = 31,130 Gas gifted to Village of Nuiqsut =9,270 1 hereby certify that the foregoing is true and correct to the best of my knov4edge. Signature: Title: Revenue & Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60°F. Authority 20 AAC25.235. Printed Name: Diane Hendrickson Phone: Date: June 20, 2017 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS May4T DATE START TIME DATE END TIME PLANNED UNPLANNED VOLUME MSCF DESCRIPTION OF FLARING EVENT ACTION TAKEN TO MINIMIZE VOLUME Total Fkre> 1 Hour 0 Total Flare_ 1 Hour 10.112 Pilotanrt PuMe 11.911 Total Flare 22,023 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1030000017 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. Month/Year of Disposition June -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 31,329 Pool Name Pool Code Percent 7. Reinjected 1,570,998 ALPINE 120100 73.3% FIORD 120120 15.1% 8. Flared or vented 1 hour or less 10,461 NANUQ 120175 2.5% NANUQ-KUPARUK 120100 6.9% 9. Flared or vented more than 1 hour (see insU.) 3,180 QANNIK 120180 2.2% OTHER Undefined 0.0% 10. Pilot and Purge 13'948 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 383,396 13. Other (see instructions) Official Use Only Authorization 11 hr: Safety -3 /86 MCF 14. TOTAL VOLUME (ITEMS 8.13) 2,013,312 Lease Use MCF 15. NGL Gas Equivalent - - Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: Commissioner J Date 18. Transferred to: (Express as a negative #) 19. Remarks: Gas sold to Alpine Transportation Company = 25,585 Gas gifted to Village of Nuiqsut =5,744 1 hereby certify that the foregoing is true and correct to the best of my knowledge. ��� Note: All volumes must be corrected to nature: %L Title: Revenue & Regulatory Analyst pressure of 14.65 psia and to a temperature of 60'F. Authority 20 rPr9,7nt,dme:Diane Hendrickson Phone: Date: July 20, 2017 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate V TL' IoII}(l'* CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO.443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Jun -17 START END PLANNED VOLUME DATE TIME DATE TIME UNPLANNED (MSCFI DESCRIPTION OF FLARING EVENT ACTION TAKEN TO MINIMIZE VOLUME Total Flare> 1 Hour 3,188 Total Flare <=1 Hour 10,461 PllPtand Purge 13,948 Total Flare 27,589 LP Compressor suction meter instrument malfunction causing LP Board operators notified instrument tech and discussed 06/14/2017 19:01 06/14/2017 20:26 UNPLANNED 409 Compressor to trip compressor trip.Instrument tech cleaned and repaired malfunctioning instrument and restarted. 06/15/2017 16:46 06/15/2017 18:01 PLANNED 410 LP compressor shutdown while transitioning power generation system Restarted LP compressor for facility maintenance 06/15/2017 2323 06/16/2017 0047 PLANNED LP compressor shutdown while harshening power generation system Restarted LP compressor for facility maintenance 06/18/2017 21:29 06/18/2017 2341 UNPLANNED 2244 Alpine Facility was shut down for annual maintenance. Gas was flared Total facility restart during startup while transition to normal Operations 06/19/2017 01:22 06/19/2017 02:50 UNPLANNED 117 Alpine Facility was shut down for annual maintenance. Gas was flared Total facility restart during startup while transition to normal Operations Total Flare> 1 Hour 3,188 Total Flare <=1 Hour 10,461 PllPtand Purge 13,948 Total Flare 27,589 GAS FLARING or VENTING REPORT - CONOCOPHILLIPS ALASKA, INC. FACILITY: Alpine AIR PERMIT NUMBER: A00489TVPOI GAS DISPOSITION Date of Occurrence: 6/14/2017 Bert Time of Occurrence: H.,Min (mm/dd/yy) (Check Selection) 00:00 24_00 From: 19:01 To: 20:26 = 01:25 Total Volume Flared or Vented: 409.2 MSCF BBLS From: To: ka, Planned ❑ Unplanned yu From: To: _ _ From: To: _ _ Meter No: MTR-35g12 Total Minutes Flared or Vented is0126 (Includes volume Flared which generated Mack smoke. if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) SID TIC# for X Process upset in C3 Module LP Compressor TIC SO due Nmics at teoperalure section of facility Iogh EMERGENCY SHUTDOWN Flaring for drillsile shutdown / startup Electrical / Instrumentation manunclion Flare system testing ExcessivernsumcleM Inlet gas rates Into facility Fealty shutdown an — SID on high temperature Facility Maintenance X Other: C-33012 LP Compreasor-High Temp SO Comments: LP Compressor suction meter instrument malfunction causing LP Compressor trip B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started / restarted TIC # Stabilized facility process and operation Compressor/ train depressured Repaired equipment difficulties Reduced / increased inlet gas rates with Completed flare testing Facility maintenance completed X Corrected E&I fluctuation / failure Other: Comments: Board operators whfiad insWmenl tech and discussed conpressor trip. Instrument tech cleaned and repair malfunlianing instrument and restarted. C. Flaring or Venting was: (Check one) I] necessary for facility operations, repairs, upgrades, or testing procedures ❑ an emergency that threatened life or property ❑ necessa to even) lose of ultimate remve Ventina Incident ❑ No: ❑ (If Yes, complete form & contact Environmental immediately) Was the volume over 1,000 mscf7 Yes: Flare Incident TRUE Did incident last for longer than 1 hour? Yea 2 No ❑ If Yes, fax this report to Environmental within 24 hours at KRU- 669-7712 or ALP at 6704607 Did event cause black smoke' > 3 minutes in 1 hr or 6 consecutive minutes? Yes: ❑ No: If Yes, contact Enviromental'mmediat d KRU 669-7242 or ALP 6704200 and fax this report to Env at KRU- 669-7712 or ALP at 6704507 (enter tag number and description) Black smoke' emitted from source: Date and time of black smoke event: From: To: Volume Oared which generated black smoke': MSCF _BBLS Description of steps to minimise emissions: (Section B above) Material flared: Gas: X NGLs: Other: General Weather: Air Temperature: SOF ambient Wind Speed/Direction: NE tOMPH ' Observation by Non -Certified Visible Emission Observer Based on Information and belief formed after reasonable Inquiry, I certify that the statements and information in and attached to this document are true, accurate and complete Date �� Facility Supervisor cc: Alpine: Field Environmental plvmce Coordinators, ALP -14 Ku awk: Field Environmental Compliance Coordinators, NSK-61 LP Gas Flad,q Raped 061417-revl.As 6115/2017 Alpine Environmental From: Alaska SCADA <AlaskaSCADA@cop.com> Sent: Wednesday, June 14, 2017 8:28 PM To: ALP SCADA Analyst; Alpine Lead Operators; NSK Env Coord Air Quality & Spill Plans; Alpine Environmental; ALP Automation Subject: # ALPINE SCADA: Reportable LP Flare Event IP21 has recorded a reportable LP Flare event. Flare Event Number: 3794 Flare Event Started: 14 -JUN -1719:01:00.0 Flare Event Ended: 14 -JUN -17 20:25:49.1 Flare Event Duration: 1 Hour, 24 Minutes, 49.1 Seconds Flare Event Volume: 409.186 (MSCF) Go to IP21 Flare Event History display (FLAREHLP) for more details. This email was generated by SQL: FLR_Event on 14 -JUN -17 20:28:02.4 GAS FLARING or VENTING REPORT - CONOCOPHILLIPS ALASKA, INC. FACILITY: Alpine AIR PERMIT NUMBER: AQ0489TVP01 GAS DISPOSITION Date of Occurrence:6/15/2017 +fibre ❑yam Time of Occurrence: (mm/dd/yy) (Check Selection) 00_00 24:00 RnM'n From: To: _ Total Volume Flared or Vented: 93 MSCF BELS From: 23:23 To: 00_47 = 01:24 Planned ❑ Unplanned 0 From: To: _ From: To: _ Meter No: MTR-35012 Total Minutes Flared or Vented 0124 (includes volume flared which generated black smoke, if applicable) A. Description of Incident and Cause: (Check as many as nestled to fully describe the Incident) SID T/Ck Process upset In T/C SD due to high exhaust temperature section o1 facility EMERGENCY SHUTDOWN Flaring for dr ilsge shutdown I startup Electrical I Instrumentation malfunction Flare system testing Excessivelinsulficienl inlet gee rales into facility Faulty shutdown on X Facility Maintenance X Other: SD of Alpine production Facility Comments: Alpine maintenance shutdown activities resulted in flared gas to complete the shutdown and depressurize the facility S. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started / restarted TIC M Stabilized facility process and operation Compressor / train depressured Repaired equipment difficulties X Reduced / increased inlet gas rates with Completed flare testing Facility maintenance completed Connected E&I fluctuation/failure Other. Commands: ting norther flare emmisslons for the malnlnenace activity. 7777= C. Flaring or ❑+ necessary for facility operations. repairs, upgrades, or testing procedures ❑ an emergency that threatened life or property ❑ necessmy to prevent less of ultimate mcove Venting Incident ❑ No: ❑ (If Yes, complete form & contact Environmental Immediately) Was the volume over 1,000 mscf? Yes: Flare Incident TRUE Did incident last for longer than 1 hour? Yes ❑+ No ❑ I/ Yes, fax this report to Environmental within 24 hours at KRU- 669-7712 or ALP at 6704607 Did event cause black smoke-> 3 minutes In 1 hr or 6 consecutive minutes? Yes: ❑ No: ❑+ If Yea, contact Env romental immediately KRU 669-7242 or ALP 670-4200 and fax this report to Env at KRU- 669-7712 or ALP at 670.4507 (enter lag number and description) Black smoke' emitted from source: Dale and time of black smoke event: From: To: Volume flared which generated black smoke': MSCF _BBLS Description of steps to minimize emissions: (Section B above) Si all Producing "Is for the maintenance activity Material (tared: Gas: 93 msof NGLs: Other: General Weather: Air Temperature: 29F ambient Wind Speed/Direction: 10MPH NE ' Observation by Nan -Certified Visible Emission Observer — Based on information and belief formed after reasonable Inquiry, I certify that the statements and information In and attached to this document are hue, accurate and complete Data (.Q 1 I l.e 1 v'7 Facility Supervisor cm Alpine: Field Environmental Compliance Coordinators, ALP -14 Ku aruk: Field Environmental Compliance Coordinators, NSK-fit LP Gas Flaring Repel 081517-2.ds WINZD17 Alpine Environmental From: Alaska SCADA <AlaskaSCADA@cop.com> Sent: Friday, June 16, 2017 12:50 AM To: ALP SCADA Analyst; Alpine Lead Operators; NSK Env Coord Air Quality & Spill Plans; Alpine Environmental; ALP Automation Subject: # ALPINE SCADA: Reportable LP Flare Event IP21 has recorded a reportable LP Flare event Flare Event Number: 3798 Flare Event Started: 15 -JUN -17 23:22:00.0 Flare Event Ended: 16 -JUN -1700:46:33.8 Flare Event Duration: 1 Hour, 24 Minutes, 33.8 Seconds Flare Event Volume: 93.3699 (MSCF) Go to IP21 Flare Event History display (FLAREHLP) for more details. This email was generated by SQL: FLR_Event on 16 -JUN -17 00:49:32.5 GAS FLARING or VENTING REPORT - CONOCOPHILLIPS ALASKA, INC. FACILITY: Alpine AIR PERMIT NUMBER: AQ0489TVP01 GAS DISPOSITION Date of Occurrence: 6115/2017+�bm ❑- Time of Occurrence: Hrs_MI" (mmlddtyy) (Check Selection) RM24_00 From: 16:46 To: 16__01 = 0i 15 Total Volume Flared or Vented: 316 MSCF BELS From: To: _ Planned ❑ Unplanned 91 From: To: _ From: To: _ Meter No: MTR-35012 Total Minutes Flared or Vented = 01:15 (Includes volume flared which generated black smoke, if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) X S/DT/CM CF-C-32012 X Freese. upset in C3 Module LP Compressor T/C SD due to high exhaust teap(saWre section of fadi ty EMERGENCY SHUTDOWN Flaring for Wilsite shutdosin / atanup X Electrical/ IreWmenlatian malfunction Flare systare testing ExcessiverinsuMcient inlet gas rales Into facility Faulty shutdown on Facility Maintenance Other. Comments: LP Compressor shutdown while transitioning Power generation system for facility maintenance for event 16:46 to 78:07 B. Action Taken to Eliminate Cause and Prevent Recumence: (Check and describe as applicable) facility process and operation X Started y restarted T/C 9 CF-C-32012 Stabilized facility Compressor/ train depressured Repaired equipment difficulties Reduced I increased inlet gas rates with Facility maintenance completed Completed flare testing X Connected E81 fluctuation / failure Other: Comments: Stabilized Power system and Restarted LP Compressor C. Flaring or Venting Was: (Check one( ❑ an emergency that threatened life or property 0 necessary for facility operations, repairs, upgrades, or testing procedures ❑ necessmy to prevent loss of ultimate recovery Venting Incident ❑ NO: ❑ (1f Yes, complete form a contact Environmental Immediately) Was the volume over 1,000 meet? Yes: Flare Incident TRUE Did incident last for longer than l hour? Yes ❑+ No ❑ If Yea, fax this report to Environmental within 24 hours at KRU- 659-7712 or ALP at 670-4607 Did event cause black smoke > 3 minutes in 1 hr or 6 consecutive minutes? Yes: ❑ No: ❑+ IF Yes, contact Environmental Immediately KRU 669-7242 or ALP 670-4200 and fax this report to Env at KRU- 669-7712 of ALP at 670-4607 (enter tag number and description) Black smoke' emitted from source: Date and time of black smoke- event: From: To: Volume flared which generated black smoke': MSCF _BELS Description of steps to minimize emissions: (Section B above) Restarted necessary Power General rs f r tan' g the LP Compressor Material flared: Gas: 316 men NGLs: Other: General Weather: Air Temperalum: 29F ambient Wind Speed/Direction: 70MPH HE ' Observation by Non-Certified Visible Emission Observer Based on information and belief formed after reasonable Inquiry, I certify that the statements and Information in and attached to this document are true, accurate and ce �1 Date Facility Supervisor J Sly L� cc: Alpine: Field Environmental Compliance Coordinators, ALP-14 Ku arok: Field Environmental Compliance Coordinators, NSK- 61 LP Gas Fla rhV Re"d 0a16174.da &1&2017 Alpine Environmental From: Alaska SCADA <AlaskaSCADA@cop.com> Sent: Thursday, June 15, 2017 6:03 PM To: ALP SCADA Analyst; Alpine Lead Operators; NSK Env Coord Air Quality &Spill Plans; Alpine Environmental; ALP Automation Subject: # ALPINE SCADA: Reportable LP Flare Event IP21 has recorded a reportable LP Flare event Flare Event Number: 3797 Flare Event Started: 15 -JUN -1716:45:00.0 Flare Event Ended: 15 -JUN -17 18:00:05.8 Flare Event Duration: 1 Hour, 15 Minutes, 5.8 Seconds Flare Event Volume: 316.509 (MSCF) Go to IP21 Flare Event History display (FLAREHLP) for more details. This email was generated by SQL: FLR_Event on 15 -JUN -17 18:03:04.6 GAS FLARING or VENTING REPORT - CONOCOPHILLIPS ALASKA, INC. FACILITY: Alpine AIR PERMIT NUMBER: AQ20489TVP01 GAS DISPOSITION Data of Occurrence: 6/111/2017 Flare Ellet Time of Occurrence: (mm/dd/yy) (Check Selection) 0000_DO 2400 HrsMin From: 21:29 To: 20_41 = 0213 Total Volume Flared or Vented: M44 MSCF BELS From: To: _ _ Planned ❑ Unplanned P1 From: To: _ From: To: _ Meter No: MTR-35032 Total Minutes Flared erVented 02:15 (Includes volume Cared which generated black smoke, 8 applicable) A. Description of Incident and Cause: (Check as many as needed to ally desedbe the incident) SID TIC# for - Process upset in TIC SO due to high exhaust Iemparalem section or facility EMERGENCY SHUTDOWN X Flaring for Facillystertup Electrical / Instrumentation scaguxtlen Flare system testing Excessive/insusmAent inlet gas rates into facility Faulty shutdown on FaciityMaintenance X Other: Alpine Fac Startup after Maintenance Comments: Alpine Facility wee shut down for annual maintenance. Gas was flared during startup while transitioning to normal operations. B. Action Taken to Ellmhude Cause and Prevent Recurrence: (Check and describe as applicable) X Started / restarted TIC # C-33012 HP X Stabilized facility process and operation Compressor / train demsesured Repaired equipment difficulties Reduced / increased inlet gas Was with Completed flare testing X Facility maintenance completed Connected E&I fluctuadnn / failure Other: Comments: Total Facility restart C. Flaring or Venting was: (Check one) R) necessary for facility operations, repairs, upgrades, or testing procedures ❑ an emergency that threatened Ile or property ❑ m cessa to prevent loss of ultimate recoveni Venting Incident Was the volume over 1,000 mscf? Yes: ❑ No: ❑ (If Yea, complete form & contact Environmental Immediately) Flare Incident TRUE Did Incident last for longer than 1 hour? Yes 17 No ❑ It Yes, fax this report to Environmental within 24 hours at KRU- 669-7712 or ALP at 6704507 Did event cause black smoke'> 3 minutes in 1 hr or 6 consecutive minutes? Yes: ❑ No: If Yes, contact EnAmmental Immediataly KRU 869.7242 or ALP 670.4200 and fax this report to Env at KRU- 669.7712 or ALP at 6704607 Black smoke emitted from source: (enter tag number and description) Date and time of black smoke- event From: To: Volume flared which generated black smoke': MSCF _BBLS Description of steps to minimize emissions: (Section B above) Motorist flared: Gas: X NGLs: Omer General Weather: Air Temparatum: 40F ambient Wind Speed/Direefion: SAWN out of NE ' Observation by Non-Carlified Visible Emission Observer Based on infoena0on and belief farmed after reasonable Inquiry, I certify that the statements and Information in and attached to this document are true, accurate and complete.�Q/�fj�� �� /) Data 4419 Facility Supervisor / 7"J<�' cc: Alpine: Field Environmental Compliance Coordinators, ALP -14 Ku mk: Field Environmental Compliance Coordinators, NSK-61 LP Gas Flaring Repan 081811 sls WIM017 Alpine Environmental From: Alaska SCADA <AlaskaSCADA@cop.com> Sent: Sunday, June 18, 2017 11:44 PM To: ALP SCADA Analyst; Alpine Lead Operators; NSK Env Coord Air Quality & Spill Plans; Alpine Environmental; ALP Automation Subject: # ALPINE SCADA: Reportable LP Flare Event Follow Up Flag: Follow up Flag Status: Flagged IP21 has recorded a reportable LP Flare event. Flare Event Number: 3832 Flare Event Started: 18 -JUN -17 21:29:00.0 Flare Event Ended: 18 -JUN -17 23:41:32.2 Flare Event Duration: 2 Hours, 12 Minutes, 32.2 Seconds Flare Event Volume: 2244.28 (MSCF) Go to IP21 Flare Event History display (FLAREHLP) for more details. This email was generated by SQL: FLR_Event on 18 -JUN -17 23:43:52.6 GAS FLARING or VENTING REPORT - CONOCOPHILLIPS ALASKA, INC. FACILITY: Alpine AIR PERMIT NUMBER: AQ20489TVP01 GAS DISPOSITION Date of Occurrence: 6/19/2017 Aare ❑/ant Time of Occurrence: (1nm/cidlyt) (Check SelecOan) 0000 24:00 Hr In From: 01:22 To: 0260 01:26 Total Volume Flared or Vented: 117 MSCF BBLS From: To: _ Planned ❑ Unplanned 10 From: To: _ _ From: To: Meter No: MTR - 35012 Total Minutes Flared or vented 012e (Includes volume flared which generated black smoke. if applicable) A Description of Incident and Cause: (Check at many as needed to fully describe the Incident) SAD T/C0 for Process upsets TIC so a,e a hien..dv a,t temperature section of facility EMERGENCY SHUTDOWN X Flaring for Facility$WUP Electrical I Imleumenlaffan malfunction Flare system testing Exeaealve7nsWficienf inlet gas mica intofacilily Faulty shutdown on X Fsdlity Maintenance X Other: Alpine Fac Startup after Maintenance Comments: Alpine Facility was shut down for annual malmnence. Gas was flared during startup while transiBoning W normal operations. B. Action Taken to Eliminate Cauae and Prevent Recurrence: (Check and describe as applicable) X Started / restarted T/C 6 C-32012 LP Compressor Stabilized facility process and operation Compressor / train depressured Repaired equipment difficulties Reduced/ Increased irdat gas rates with Completed flare testing X Facility maintenance completed Connoted E6l fluctuation/failure Other. _ Comments: Total Facility restart C. Flaring or Venting was: (Check one) ❑+ necessary for facility operations, repairs, upgrades, or testing procedures ❑ an emergency that threatened life or property ❑ necessary to prevent loss of ultimate recovery Venting Incident Was the volume over 1,000 meet? Yes: ❑ No: ❑ (If Yea, complete form A contact Environmental immediately) Flare Incident TRUE Did incident last for longer than 1 hour? Yes ❑+ No ❑ If Yes, fax this report to Environmental within 24 boom at KRU- 659.7712 or ALP at 6704607 Did event rause black smoke > 3 minutes In 1 or or 6 consecutive minutes? Yes: ❑ No: ❑' If Yes, contact Environmental immediately KRU 659-7242 or ALP 670.4200 and fax this report to Env at KRU- 969-7712 or ALP at 6704607 Black smoke' emitted from source: (enter lag number and deacriplbn) Dale and time of black smoke* event: From: TV.. Volume flared which generated black smoke': MSCF BBLS Description of steps to minimize emissions: (Section B above) Material flared: Gas: X NGLs: Other: General Weather: Air Temperature: Wind Speed/Direction: • Observation by Non -Certified Visible Emission Observer Based on Information and belief farmed after reasonable inquiry, I certify that the statements and information in and attached to this document ere true, accurate and complete. Date Facility Supervisor cc: Alpine: Field Environmental Compliance Coordinators, ALP -14 Ku amk: Field Environmental Compliance Coordinators, NSK- 61 LP Fas Flaring Report 0a191].ds Wig/2017 Alpine Environmental From: Alaska SCADA <AlaskaSCADA@cop.com> Sent: Monday, June 19, 2017 2:53 AM To: ALP SCADA Analyst; Alpine Lead Operators; NSK Env Coord Air Quality & Spill Plans; Alpine Environmental; ALP Automation Subject: # ALPINE SCADA: Reportable LP Flare Event IP21 has recorded a reportable LP Flare event Flare Event Number: 3838 Flare Event Started: 19 -JUN -1701:22:00.0 Flare Event Ended: 19 -JUN -17 02:50:34.7 Flare Event Duration: 1 Hour, 28 Minutes, 34.7 Seconds Flare Event Volume: 117.018 (MSCF) Go to IP21 Flare Event History display (FLAREHLP) for more details. This email was generated by SQL: FLR_Event on 19 -JUN -17 02:53:19.5 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1030000017 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. MonthNearof Disposition July -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 33,454 Pool Name Pool Code Percent 7. Reinjected 1,706,782 ALPINE 120100 74.3% FIORD 120120 16.5% 8. Flared or vented 1 hour or less 15,928 NANUQ 120175 2.13% NANUQ-KUPARUK 120100 5.2% 9. Flared or vented more than 1 hour (see instr.) 0 QANNIK 120180 27; OTHER Undefined 0.07/ 10. Pilot and Purge 5,557 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 398,426 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 2,170,147 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: Commissioner Date 18. Transferred to: (Express as a negative #) 19. Remarks: Gas sold to Alpine Transportation Company = 28,678 Gas gifted to Village of Nuiqsut =4,776 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ✓ ��� Title: Revenue & Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 ° F. Authority 20 AAC25.235. Printed Name: Diane Hendrickson Phone: Date: August 20, 2017 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS JUN] Total Flare> 1 Hour Total Flare <=1 Hour 15.928 Pilot and Purge 15.557 Total Flare 31.485 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1030000017 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. Mon#VYear of Disposition August -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 38,680 Pool Name Pool Code Percent 7. Reinjected 1,817,152 ALPINE 120100 65.8% FIORD 120120 15.9% 8. Flared or vented 1 hour or less 4,308 NANUO 120175 2.2% NANUO-KUPARUK 120100 14.3% 9. Flared or vented more than 1 hour (see ins[r.) 0 QANNIK 120180 1.8% OTHER Undefined 0.0% 10. Pilot and Purge 11,801 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 418,479 13. Other (see instructions)_ - - Authorization >7 hr: Official Use Only Safety MCF 14. TOTAL VOLUME (ITEMS6-13) 2,290,420 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste. MCF 17. Transferred from: Commissioner Date 18. Transferred to: (Express as a negative #) 19. Remarks: Gas sold to Alpine Transportation Company = 30,836 Gas gifted to Village of Nuiqsut =7,844 I hereby certify that the Foregoing is true and correct to the best of my knowledge. 9''� Note: All volumes must be corrected to Signature: Z;)Zt /i.Q �/Jj Title: Revenue & Regulatory Analyst pressure of 14.65 psia and to a temperature of 600F. Authority 20 Printed Name: Diane Hendrickson Phone: Date: September 20, 2017 AAC25.235. Form 10-422 Rev. 5/2009 - INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Aug -17 DATE START TIME DATE END TIME PLANNED UNPLANNED VOLUME MSCF DESCRIPTION OF FLARING EVENT ACTION TAKEN TO MINIMIZE VOLUME Total Flare>1 Hour 0 Total Ftare<=1 Hour 4.308 PllotanAPur9e 11,801 Total Flare 16,109 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1030000017 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. MonthNear of Disposition September -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 38,208 Pool Name Pool Code Percent 7. Reinjected 1.694,178 ALPINE 120100 66.5% FIORD 120120 17.7% 8. Flared or vented 1 hour or less 2,396 Ni 120175 2.4% NANUO-KUPARUK 120100 11.7% 9. Flared or vented more than 1 hour (see instr.) 0 QANNIK 120180 1.8% OTHER Undefined 0.0% 10. Pilot and Purge 9,345 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 415,149 13. Other (see instructions) Official Use Only Authorization 11 hr: Safety MCF 14. TOTAL VOLUME (BEMs 6-13) 2,159,276 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: Commissioner Date 18. Transferred to: (Express as a negative #) 19. Remarks: Gas sold to Alpine Transportation Company = 29,725 Gas gifted to Village of Nuiqsut =8,483 1 hereby certify that the foregoing is true and correct to the best of my knowledge. j� Note: All volumes must be corrected to Signature: ✓ �� ��� Title: Revenue & Regulatory Analyst pressure of 14.65 psia and to a temperature of 60°F. Authority 20 Printed Name: Diane Hendrickson Phone: Date: October 20, 2017 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS SeP 1T DATE START TIME DATE END TIME PLANNED UNPLANNED VOLUME MSCF DESCRIPTION OF FLARING EVENT ACTION TAKEN TO MINIMIZE VOLUME Total Flare> 1 Hour a Total Flare e.1 Hour 2.396 Pilota.d Porge 9.345 Total Flare 11,741 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1030000017 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. Monthlyear of Disposition October -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 39,410 Pool Name Pool Code Percent 7. Reinjected 1,682,603 ALPINE 120100 67.47/ FIORD 120120 15.031. B. Flared or vented 1 hour or less 1,734 NANUO 120175 2.4% NANUQ-KUPARUK 120100 13.5% 9. Flared or vented more than 1 hour (see instr.) 0 OANNIK 120180 1.8%OTHER0.0 Untlefinetl % 10. Pilot and Purge 9.920 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 442,946 13. Other (see instructions) Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 613) 2,176,613 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: Gas sold to Alpine Transportation Company = 30,500 Gas gifted to Village of Nuiqsut =8,910 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: Title: Revenue & Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60°F. Authority 20 AAC25.235. Printed Name: Diane Hendrickson Phone: Dale: November 20, 2017 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS On -1] DATE START TIME DATE END TIME PLANNED UNPLANNED VOLUME MSCF DESCRIPTION OF FLARING EVENT ACTION TAKEN TO MINIMIZE VOLUME Total Flare> 1 Hour Total Flare <-1 Hour 1,734 Pilot and Purge 9,920 Total Flare 11,654 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1030000017 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. Month/Vear of Disposition November -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 41,092 Pool Name Pool Cade Percent 7. Reinjected 1,511,047 ALPINE 120100 69.03% FIORD 120120 13.4% 8. Flared or vented 1 hour or less 3,992 NANUQ 120175 2.2% NANUQ-KUPARUK 120100 14.1% 9. Flared or vented more than 1 hour (see instr.) 0 QANNIK 120180 1.2% OTHER Undefined 0.0% 10. Pilot and Purge 13,648 11. Assist Gas 100.0% 12. Fuel gas used in lease operations. 449,653 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 2,019,432 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: Gas sold to Alpine Transportation Company = 29,729 Gas gifted to Village of Nuiqsut =11,363 1 hereby certify that the foregoing is true and correct to the best of my knowledge. tu: f/l.V/%/'j.Q. Q%�/1i Title: Revenue & Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60°F. Authority 20 AAC25.235. rPntd.dNarn,: Diane Hendrickson Phone: Date: December 20, 2017 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Nov -17 Total Flare> 1 Hour 0 Total Flare <=1 Hour 3,992 PilotanCPurge 13,648 Total Flare 17,640 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1 0 3000001 7 2. Facility Name Colville River Unit Processing Facility 3. Field Colville River Unit 4. Operator CONOCOPHILLIPS ALASKA, INC. 5. MonthNear of Disposition December -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 44,219 Pool Name Pool Code Percent 7. Reinjected 1,521,693 ALPINE 120100 71.2% FIORD 120120 11.3% 8. Flared or vented 1 hour or less 1,182 NANUO 120175 2.4% NANUO-KUPARUK 120100 14.2% 9. Flared or vented more than 1 hour (see instr.) 0 OANNIK 120180 0.9% OTHER0.0% Undefined 10. Pilot and Purge 14,575 11. Assist Gas 00.0% 12. Fuel gas used in lease operations. 468,985 13. Other (see instructions) Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS &13) 2,050,654 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: Gas sold to Alpine Transportation Company = 31,978 Gas gifted to Village of Nuiqsut = 12,241 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: �GCr.>+Z2 6��l1.8II1i Title: Revenue & Regulatory Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60°F. Authority 20 AAC25.235. Printed Name: Diane Hendrickson Phone: Date: January20, 2018 Form 10-422 Rev. 5/2009 IN5TRUCFIONS ON REVERSE SIDE Submit in Duplicate CONOCOPHILLIPS ALASKA, INC CONSERVATION ORDER NO. 443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Dea17 Total Flare > 1 Hour Total Flare<=1 Hour Mu Pilot and Purge 14,575 Total Flare 15.757