HomeMy WebLinkAboutKRU CPF 1+2+3 - ConocoPhillips Alaska, Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2017
Facility: KRU CPF 1 + CPF 2 + CPF 3
Operator: ConocoPhillips Alaska, Inc.
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CPF1
CPF2
CONFIDENTIAL pursuant to: AS 43.05.230. AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f)
Caelus Gas Usage
Total
Pilot and Purge
1,822
Flare Less than 1 hour
337
Flare Greater than 1 hour
30
Fuel
50,798
Asset Gas
165,916
MakeUp Gas
0
Return Gas
618,453
Total Production
837.356
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
DESCRIPTION OF FLARING
ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
Electrical Breaker Cubicle
panel CC -103 lost power due
12:13:00 to a potential faulty Reboiler Production wells were shut-in
AM- breaker causing utility loss and until power was restored to CC -
01:40:00 shutodwn of C Gas Lift 103 and C Gas Lift Compressor
1/1/2017 AM 30 Compressor. N restarted.
DESCRIPTION OF FLARING
ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
0
CPF3
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
0
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (t)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CPF1
CPF2
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (1)
Caelus Gas Usage
Total
Pilot and Purge
1,642
Flare Less than 1 hour
175
Flare Greater than 1 hour
0
Fuel
45,080
Asset Gas
294,691
MakeUp Gas
0
Return Gas
420,482
Total Production
762,070
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
CPF3
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
0
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40 25.10. AS 38.05.035 (a)(6), and AS 36.05.036 (f)
Caelus Gas Usage
Total
Pilot and Purge
1,750
Flare Less than 1 hour
246
Flare Greater than 1 hour
0
Fuel
47,216
Asset Gas
227,313
MakeUp Gas
0
Return Gas
480,375
Total Production
756,900
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
CPF1
DESCRIPTION OF ACTION TAKEN TO
DATE TIME VOLUME MSCF FLARING EVENT UNPLANNED MINIMIZE VOLUME
0
CPF2
DESCRIPTION OF ACTION TAKEN TO
DATE TIME VOLUME MSCF FLARING EVENT UNPLANNED MINIMIZE VOLUME
0
CPF3
DESCRIPTION OF ACTION TAKEN TO
DATE TIME VOLUME MSCF FLARING EVENT UNPLANNED MINIMIZE VOLUME
0
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (t)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (0
Caelus Gas Usage
Total
Pilot and Purge
1,736
Flare Less than 1 hour
228
Flare Greater than 1 hour
0
Fuel
45,225
Asset Gas
262,146
MakeUp Gas
0
Return Gas
575,289
Total Production
884,624
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
CPF1
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
CPF2
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
0
CPF3
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
U
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (1)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CPF1
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f)
Caelus Gas Usage
Total
Pilot and Purge
1,578
Flare Less than 1 hour
297
Flare Greater than 1 hour
2
Fuel
40,370
Asset Gas
108,675
MakeUp Gas
706
Return Gas
566,033
Total Production
716,955
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
DESCRIPTION OF FLARING
ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
1C/1B water injection line was
depressured after displacing
water with gas for upcoming
5/13/2017 01:28:00 P 2 1C/1B WI piping depressure Y internal pipe coating project.
CPF2
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
0
CPF3
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
0
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.038 (1)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (1)
Caelus Gas Usage
Total
Pilot and Purge
1,411
Flare Less than 1 hour
443
Flare Greater than 1 hour
10
Fuel
36,341
Asset Gas
356,591
MakeUp Gas
- 0
Return Gas
332,009
Total Production
726,805
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
CPF1
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
CPF2
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
TIME VOLUME MSCF EVENT UNPLANNED VOLUME
CPF3
DESCRIPTION OF FLARING ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF EVENT UNPLANNED VOLUME
6/23/2017 03:33:00 P 4 Ambient temp. Continued to cuN Reduced/increased inlet gas rates
6/24/2017 01:02:00 P 6 High ambient temperatures N Reduced/increased inlet gas rates
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f)
Caelus Gas Usage
Total
Pilot and Purge
1,351
Flare Less than 1 hour
525
Flare Greater than 1 hour
218
Fuel
32,807
Asset Gas
430,206
Makeup Gas
0
Return Gas
259,955
Total Production
725,062
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
CPF1
ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
7/18/2017 05:30:00 PM - 07:51:00 PM 59 Electrical/Instrumental Malfunction
4160 breaker tripped for unknown
reasons shutting down "A" GLC and
other equipment.
Reduced/Increased inlet gas rates.
CPF2
ACTION TAKEN TO MINIMIZE
DATE TIME
VOLUME MSCF DESCRIPTION OF FLARING EVENT
UNPLANNED
VOLUME
Ambient temps took a spike and "B"
GLC was unable to move any gas
through the plant. Stabilized facility
7/6/2017 11:38:00 PM - 12:53:00 AM
10 Excessive/insufficient inlet gas rates into facility
N
process and operation.
All three turbine drivel GLC's
unloaded due to high ambient temp.
Recuded inlet gas rates and
stabilized facility process and
7/28/2017 10:30:00 AM -12:05:00 PM
67 Process upset in A/B/C GLC section of facility
N
operation.
CPF3
ACTION TAKEN TO MINIMIZE
DATE TIME
VOLUME MSCF DESCRIPTION OF FLARING EVENT
UNPLANNED
VOLUME
Cut gas, called tech to come help
7/5/2017 09:42:00 PM - 10:57:00 PM
71 High ambeint temps caused both GLC to slow rpms.
N
determine cause of trip.
Reducedlncreased inlet gas rates.
7/6/2017 12:51:00 PM - 02:45:00 PM
11 High ambeint temps caused B GLC to recycle
N
Shut in wells.
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (1)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f)
Caelus Gas Usage
Total
Pilot and Purge
1,476
Flare Less than 1 hour
204
Flare Greater than 1 hour
3
Fuel
39,872
Asset Gas
479,389
MakeUp Gas
0
Return Gas
289,371
Total Production
810,315
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
CPF7
ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
CPF2
ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
CPF3
ACTION TAKEN TO MINIMIZE
DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
Reduced compressor efficiency due
to having after coolers out of service
8/15/2017 11:52:00 AM - 12:52:00 PM 3 Excessive/insufficient inlet gas rates into facility N for repairs
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f)