Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutKRU CPF 2 - ConocoPhillips Alaska, Inc.State of Alaska AOGCC Gas Disposition Files Year: 2017 Facility: Kuparuk River Unit CPF 2 Operator: ConocoPhillips Alaska, Inc.   CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000022 2. Facility Name 3, Field CENTRAL PROCESSING FACILITY#2 Ku amk River Unit 4Operator CONOCOPHILLIPS COMPANY 5. MonthlYear of Disposition 2114/1710:59:24 AM GW -06:00 Dis osition Volume MCF 20. For production from r ie pools, list cnnbipution of each pool as a percent of Total Volume 6. Sold 10242 Pool Name Pool Code Percent 7. Reinjected 2431252 KUPARUKRIVER UNIT 490100 72.45% 8. Flared or vented i hour or less 1397 KUPARUK RIVER UNIT MELTWATER 490140 14.19% 9. Flared or vented more than l hour (see instr.) 0 KUPARUK RIVER UNIT TARN 490160 13.19% 10. Pilot and Pure 15438 KUPARUK RIVER UNIT TABASCO 490165 0.17% 11. Assist Gas 100.00% 12. Fuel gas used in lease operations 762593 13. Other sea instructions 0 official use only 14. TOTAL VOLUMES (ITEMS 6-13) 3220922 Authorization >1 hr Safety MCF 15. Ni Gas Equivalent 0 Lease Use MCF 16. Purchased gas p Conservatlon MCF 17. Transferred from: 0 Waste: MCF 18. Transferred to: (Express as a negative # p Commissioner Date 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired kr LSEOR reflected on line 17. Transferred from =PBU LSEOR NGLs 0 and CPF1 transferred 0, Line 6 is gas sold to KTC. I hereby caddy that the foregoing is two and correct to the best of my knowledge Signature gibe '?/"4Wi Tide Analyst. Production a Revenue Accnumin9 NOTE: All volumes must be connected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Printed! Name Phone I Auttionty, 20 AAC25235 Form 10422 Rev. 512009 CONFIDENTIAL pursuant to. AS 43.05.230, AS 40.25.100, AS 38,05 035 (a)(8), and AS 38.05.036 (1) 1/31/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 January -2017 PLANNED ACTION TAKEN TO MINIMIZE DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR Planned > 1 Hour PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 1,397 Continuous Assist 0 Pilot and Purge 15,_38 TOTAL FLARED/VENTED 16,835 CONFIDENTIAL pursuant t0: AS 43.05.230, AS 40.25.100. AS 38.05.035 (a)(8), and AS 38.05.036 (f) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000022 2. Facility Name CENTRAL PROCESS ING FACILITY#2 3. Field Kupanuk River Unit 4 Operator CONOCOPHILLIPS COMPANY 5. MomhNear of Disposition 1 3/13/171:45.41 PM GW -05:00 Deposition Vdume MCF 20. For production from mul#de pools, list contribution of each pod as a percent of Total Volume 6. Sold 9806 Pool Name Pool Code Percent 7. Reinjected 2028852 KUPARUKRIVER UNIT 490100 72.84% 8. Flared or vented l hour or less 2325 KUPARUK RIVER UNIT MELTWATER 490140 11.91% 9. Flared or vented more than 1 hour see insia.) 0 KUPARUK RIVER UNIT TARN 490160 14.92% 10. Pilot and Puma 13368 KUPARUK RIVER UNIT TABASCO 490165 0.32% 11. Assist Gas 100.00% 12. Fuel gas used in lease operations 634556 13. Other (see inst uctions) 0 Official Use Only 14. TOTAL VOW MESITEMS 6-03 2688907 Authorization >1 hr Safety MCF 15. NGL Gas Equivalent 0 Lease Use MCF 16. Purchased gas p Conservation MCF 17. Transferred from: 0 Waste: MCF 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. RemaMs: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 0. Line 6 is gas sold to KTC. I hereby certify that the foregoing is true andcorrect to the ee0beat of my knowledge Signature `514(V " a ""^' Pdnted Name Title Anelyat Production a Revemiencmunti, Phone NOTE: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. F Authority 20 AAC25235 Form 10322 Rev. W2009 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38 05.035 (a)(8), and AS 38.05.036 (0 2/2812017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 February -2017 PLANNED ACTION TAKEN TO MINIMIZE DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR Planned > 1 Hour PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 2,325 Continuous Assist 0 Pilot and Purge 13,368 TOTAL FLARED/VENTED 15,693 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000022 2. Facility Name CENTRAL PROCESSING FACILITY 3. Field Kuparuk River Unit 4 Operator CONOCOPHILLIPS COMPANY 5. MonthNear of Disposition 41131178:49: 45 AM GMT -05:00 Disposition Volume MCF 20. For Production /mm multipla pools, list con tribration of each pool as a percent of Total Volume 6, Sold 10740 Pool Name Pool Code Percent 7. Reinjected 2064759 KUPARUKRIVER UNIT 490100 68.92% 8. Flared or vented l hour or less 3214 KUPARUK RIVER UNIT MELTWATER 480140 14.62% 9. Flared or vented more than t hour(aee instr.) 0 KUPARUK RIVER UNIT TARN 490160 16,18% 10. Pilot and Pure 15788 KUPARUK RIVER UNIT TABASCO 490165 0.27% 11. Assist Gas 100.00% 12. Fuel gas used in lease operations 766173 13. Other (see instructions) 0 Of ictal Use Only 14. TOTAL VOLUMES (ITEMS 6-13) 2860674 Authorization >t hr Safety MCF 15. NGL Gas Equivalent 0 Lease Use MCF 16. Purchased gas 0 Conservation MCF 17. Transferred from: 0 Waste: MCF 18. Transferred to: (Express as a nega5ve # 0 Commissioner Data 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected online 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 0. Line 6 is gas sold to KTC. 1 hereby certify that the foregoing is true and correct to thebestof my knowledge Signature c' �Title Analys4 PmEuctian 8 Reve us nccounuiy Pdnled Name Phone NOTE: All volumes must be wnected to pressure of 14.65 psia and to a temperature of 60 degrees F. Authority 20 AAC25235 Form 10-022 Rev. 512009 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) 3/31/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 March -2017 PLANNED ACTION TAKEN TO MINIMIZE DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR Planned > 1 Hour PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes Greater than 1 hour 0 Less than 1 hour 3,214 Continuous Assist 0 Pilot and Purge 15,788 TOTAL FLAREDIVENTED 19,002 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000022 2. Facility Name CENTRAL PROCESSING FACILITY #2 3. Field Kuparuk River Unit 4 Operator CONOCOPHILLIPS COMPANY S. Month/Year of Disposition 5/121171:17:20 PM GMT -05:00 Disposition Volume MCF 20. For mducfion from multiple Dai list son fnbutkn ofeach es a pemenl of Total Volume 6. Sold 10462 Pool Name Pool Code Percent 7. Reinjected 1891558 KUPARUKRIVER UNIT 490100 70.42% 8. Flared or vented l hour or less 3026 KUPARUK RIVER UNIT MELTWATER 490140 12.57% 9. Flared or vented more than l hour a"man.) 0 KUPARUK RIVER UNIT TARN 490160 16.71% 10. Pilot and Purge 15327 KUPARUK RIVE R UNIT TABASCO 490165 0.31% 11. Assist Gas 100.00% 12. Fuel gas used in lease operations 731042 13. Other (see instructions) 0 ORiclal Use Only 14. TOTAL VOLUMES (ITEMS &13)2651415 Authorization>1 hr Safety MCF 15. NGL Gas Equivalent 0 Lease Use MCF 16. Purchased gas 0 Conservation MCF 17. Transferred from: 0 Waste MCF 18. Transferred to: (Express as a negative # 0 Commissioner Dale 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR refieded on line 17. Transferred from = PBU LSEOR NGLs 0 and OPF1 transferred 0. Line 6 is gas sold to KTC. I hereby certify that the foregoing is true and dccorrreecrtt to thebestof my knowledge Signature ?/"414 '^�"ebTitle Analyst, Pux ua. 8 Revenue Accounfing Printed Name Phone NOTE: All volumes must be corseted to pressure of 14.65 pais and to a temperature of 60 degrees F. Authority 20 AAC25 235 Form 10422 Rev. 5/2009 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) 4/30/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 April -2017 PLANNED ACTION TAKEN TO MINIMIZE DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR Planned > 1 Hour PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes Greater than 1 hour 0 Less than 1 hour 3,026 Continuous Assist 0 Pilot and Purge 15,3_27 TOTAL FLARED/VENTED 18,353 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000022 2. Facility Name 3. Field CENTRAL PROCESSING FACILIT)r` #2 Kupamk River Unit 4Operator CONOCOPHILLIPS COMPANY 5. MonthNear of Disposition 8/14!1]]:59:58 AM GMT -05:00 Disposition Volume MCF W. For production from multiple pools, list conWfwflon of each poor as a percent of Total Volume 6. Sold 10878 Pool Name Pool Code Percent 7. Reinjected 1936619 KUPARUKRIVER UNIT 490100 70.22% 8. Flared or vented l hour or less 3248 KUPARUK R WER UNIT MELTWATER 490140 12.81% 9. Flared or vented more Man l hour (see instr.) 0 KUPARUK RIVER UN IT TARN 490160 16.69% 10. Pilot and Purge 14685 KUPARUK RIVER UNIT TABASCO 490165 0.28% 1L Assist Gas 100.00% 12. Fuel gas used in lease operations 724062 13. Other see instructions) 0 Official Use Only_ 14. TOTAL VOLUMES (ITEMS &13 2689472 Authorization >1 hr ISsfety MCF 15. NGL Gas Equivalent 0 Lease Use MCF 16. purchased gas 0 Conservation MCF 17. Transferred from: 0 Waste: MCF 18. Transferred to: (Express as a negative # 0 Commissioner Date 19, Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 0. Line 6 is gas sold M KTC. I hereby certify that the / foregoing is true and ow correct to the best of my knledge Signature `�SS406d (1"4fo 14"6Y Title Analyst. Pmducmn a Revsnue A oumiiq NOTE: All volumes must be corrected to pressure of 14.65 Psis and to a temperature of 60 degrees F. Printed Name Phone Authority 20 AAC25235 Form 10422 Rev. 512009 CONFIDENTIAL pursuant to. AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) 5/31/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 May -2017 PLANNED ACTION TAKEN TO MINIMIZE DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR Planned > 1 Hour PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes Greater than 1 hour 0 Less than 1 hour 3,248 Continuous Assist 0 Pilot and Purge 14,665 TOTAL FLARED/VENTED 17,913 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (t) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4 Operator S. MonBUYear of Disposition 0290000022 CENTRAL PROCESS ING FACILITY #2 Kuparuk River Unit CONOCOPHILLIPS COMPANY 7/17/177:44:20 AM GW -05:00 Dia osi6on Volume MCF 20 For production from multiple pools. list contribution o/ each oat as a percentof Total Volume 6. Sold 10095 Pool Name Pool Code Percent 7, Reinjected 2051867 KUPARUKRIVER UNIT 490100 78.09% 8. Flared or vented l hour or less 2926 KUPARUK RIVER UNIT MELTWATER 490140 4.50% 9. Flared or vented more than l hour(see insV. 0 KUPARUK RIVER UNIT TARN 490160 17.25% 10. Pilot and Purge 12454 KUPARUK RIVER UNIT TABASCO 490165 0.17% 11. Assist Gas 100.00% 12. Fuel gas used in lease operations 718724 13. Other see instructions) 0 Official Use Only 14. TOTAL VOLUMES ITEMS 6-13 2796066 Authonaation>i hr S afety MCF 15. NGL Gas Equivalent 0 Lease Use MCF 16. Purchased gas 0 Conservation MCF 17. Transferred from: 0 Waste: MCF 18. Transferred to: Ex rens as a negative # 0 Commissioner Date 19. Remarks: Reinjected Vol does not include volumes of PBU NGLS aoquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPH transferred 0. Line 6 is gas sold to KTC. I hereby pantry that the foregoing is true and correct to the best of my knowledge Signature �a'�' Ttie Analyst Pmdutlbn 4 Revenue Accounting NOTE: All volumes must be connected to pressure of 14.65 psia and to a temperature of W degrees F. Printed Name Phone Authority 20 AAC25235 Form 10-422 Rev. 512009 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (Q 6/30/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF p2 June -2017 PLANNED ACTION TAKEN TO MINIMIZE DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVERT HOUR Planned > 1 Hour PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 2,926 Continuous Assist 0 Pilot and Purge 1254 TOTAL FLAREDNENTED 15,380 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000022 2. Facility Name 3. Field CENTRAL PROCESSING FACILITY#2 Ku ruk River Unit 4 Operator 1CONOCOPHILLIPS COMPANY 5. Month/Year of Disposition 7/311172:03:21 PM OW -05:00 disposition Volume MCF 20. For production from mul#tile pools.list contribution ofeechpool as a parcentaf Total Volume 6. Sold 9937 Pool Name Pool Code Percent 7. Reinjected 2047010 KUPARUKRIVER UNIT 490100 68.32% S. Flared or winetl l hour or less 11000.7 KUPARUK RIVER UNIT MELTWATER 490140 14.24% 9. Flared or vented more than l hour (see her. 4839.3 KU PARUK RIVER UNIT TARN 490160 17.29% 10. Pilot and Purge 14584 KU PARUK RIVER UNIT TABASCO 490165 0.15% 11. Assist Gas 100.00°a 12. Fuel gas used in lease operations 695143 13. Other (See instructions) 0 Official Use Onl 14. TOTAL VOLUMES ITEMS 8-13 2782514 Authorization -1 hr p isafety MCF V T L 1 15. NGL Gas Equivalent 0 Lease Use MCF 16. Purchased gas 0 Conservation MCF 17. Transferred from: 12 Waste: MCF 18. Transferred to: Express as a radiative # 0 —G —( Commissioner Date 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR refected on line 17. Transferred from - PBU LSEOR NGLs 0 and CPF1 transferred 12. Line 6 is gas sold to KTC. I hereby certify that the foregoingistrue and correct to the best of my knowledge Signature `� � Printed Name The Analyst. Pmdudi.n B Flava... A..ti, Phone NiAll must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. FAuthority 20 AAC25235 Form 10422 Rev. 5/2009 b/)%j13" CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (1) 713112017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 July -2017 PLANNED ACTION TAKEN TO MINIMIZE DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 11:38:00 PM - 7/612017 12:53:00 AM 627 10:30:00 AM - 712812017 12:05:00 PM 4,212 TOTAL OVER 1 HOUR 4,839 Planned> 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes Greater than 1 hour 4,839 Less than 1 hour 11,001 Continuous Assist 0 Pilot and Purge 14-584 TOTAL FLAREDNENTED 30,424 Excessive/insufficient inlet gas rates into facility Process upset in A/B/C GLC section of facility Ambient temps took a spike and "B" GLC was unable to move any gas through the plant. Stabilized facility process and operation. All three turbine drivel GLC's unloaded due to high ambient temp. Recuded inlet gas rates and stabilized facility process and operation. CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 1 and AS 38.05.036 (0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290CM22 2. Fadlity Name CENTRAL PROCESSING FACILITY p2 3. Field Kuparuk River Unit 4Operator5. CONOCOPHILLIPSCOMPANV Month/Year of Disposition 8/31/178:58'. 16 AM GMT -05:00 Disposition Volume MCF 20 For production from multiple pools. list contribution of each pool as a percent of Total Volume 6. Sold 9825 Pool Name Pool Code Percent 7. Reinjected 2036501 KUPARUKRIVER UNIT 490100 69.83% S. Flared or vented l hour or less 1494 KUPARUK RIVER UNIT MELTWATER 490140 14.18% 9. Flared or vented more than 1 hour (see insb.) 0 KUPARUK RIVER UNIT TARN 490160 15.81% 10. Pilot and Pure 13581 KUPARUK RIVER UNIT TABASCO 490165 0.18% 11. Assial Gas 100.00% 12. Fuel gas used in lease operations 686588 13. Other see instructions) 0 Official Use Only 14. TOTAL VOLUMES (fTEMS 64 3) 2747989 Authorization>1 hr Safety MCF 15, NGL Gas Equivalent p Lease Use MCF 16. Purchased gas 0 Conservation MCF 17. Transferred from. 0 Waste: MCF 18. Transferred M: (Express as a ne alive 6) 0 Commissioner Data 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPFI transferred 0. Line 6 is gas sold to KTC. I hereby candy that the foregoingistrue and conned to to best of my knowledge Signature S2 `" SK^'^'�" Printed Name Title Analyst, Praduuion a Revenue Accounting Phone NOTE: All volumes must be connected to pressure of 14.65 psia and to a temperature of 60 degrees F. Authority 20 AAC25 235 Form 10-022 Rev. 512009 CONFIDENTIAL pursuant to. AS 43.05.230. AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05 036 (f) 8131/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 August -2017 PLANNED DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR 0 Planned> 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes Greater than 1 hour 0 Less than 1 hour 1,494 Continuous Assist 0 Pilot and Purge 13,581 TOTAL FLAREDIVENTED 15,075 ACTION TAKEN TO MINIMIZE VOLUME 8:43:37 AM GMT -05:00 1. Facility Number 0290000022 2. Facility Name CENTRAL PROCESSING FACILITY 'y 3. Field Ku aruk River Unit 4 Operator CONOCOPHILLIPS COMPANY 5. Month/Year of Disposition 09/3O/178:43:37 AM GMT -05:00 Disposition Volume MCF 20. For production from multi lesols, list contribution of each pool as a Wcorif of Total Volume 6. Sold 10,462 Pool Name Peel Code Percent 7. Reinjected 1,862.787 KUPARUKRIVER UNIT 490100 68.55% 8. Flared or vented l hour or less 3,102 KUPARUK RIVER UNIT MELTWATER 490140 14.06% 9. Flared or vented more than 1 hour see instr. - KUPARUK RIVER UNIT TARN 490160 17.14% 10. Pilot and Pure 14,594 KUPARUK RIVER UNIT TABASCO 490165 11. Assist Gas 100.00 % 12. Fuel gas used in lease operations 684,017 13. Other see instructions 0 Official Use Only 14. TOTAL VOLUMES ITEMS 6.13 2,674,962 Authorization >1 hr ISaffety, MCF 15, NGL Gas Equivalent 0 1 Lease Use I MCF 16. Purchased gas 0 Conservation MCF 17. Transferred from: 0 Waste: MCF 18. Transferred to: (Express as a negative # 0 Commissioner Date 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from =PBU LSEOR NGLs 0 and CPF1 transferred 0. Line 6 is gas sold to KTC, it hereby certify that the foregoing is true and t t4 thethe CQ��e w7c -el Signature D•'Tf'��r J 7 Tille Analyst. ProducCun 8 Revenue Accounting NOTE: All volumes must be corrected to pressure of 14.65 rata and to a temperature of 60 degrees F. Printed Name Diane Hendrickson Phone 918 661-7897 Authority 20 AAC25235 Food 10-422 Rev. 512009 9/30/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 September -2017 PLANNED DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR 0 Planned > 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes Greater than 1 hour 0 Less than 1 hour 3,102 Continuous Assist 0 Pilot and Purge 14,594 TOTAL FLAREDIVENTED 17,696 ACTION TAKEN TO MINIMIZE VOLUME 10:45:35 AM GMT -06:00 1. Facility Number 0290000022 2. Facility Name CENTRAL PROCESSING FACILITY# 3. Field Ku aruk River Unit 4 Operator 1CONOCOPHILLIPS COMPANY 5. MonthrYear of Disposition I 10/31/1710:45:35 AM GMT -06:00 Disposition Volume MCF 20. Far ocfuction ftre mur' a perels, list sontribufron of each 1 as a percent of Total Volume 6. Sold 10,692 Peel Name Pool Code Percent 7. Reinjected 2.155,226 KUPARUKRIVER UNIT 490100 68.17% 8. Flaretl or vented l hour or less 1,953 KUPARUK RIVER UNIT MELTWATER 490140 14.67% 9. Flared or vented more than 1 hour see instr. - KUPARUK RIVER UNIT TARN 490160 16.95% 10. Pilot and Puree 15,917 KUPARUK RIVER UNIT TABASCO 490165 0.22% 11. Assist Gas 100.00% 12. Fuel gas used in lease operations 726,723 13. Other see instructions 0 Official Use Only 14. TOTAL VOLUMES ITEMS 6-13 2,910,511 Authorization >1 hr Safet MCF 15. NGL Gas Equivalent 0 Lease Use MCF 16. Purchased gas 0 Conservation MCF 17. Transferred from: - Waste: MCF 18. Transferred to: (Express as a negative # 0 Commissioner line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 0. Line 6 is gas sold to KTC. Date 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on 1 hereby certify that the�toore�going is tme and correc to the best Signature Title Analys4 Pmdugion 8 Revenue Aaountmi Printed Name Diane Hendrickson Phone 918-661-7897 NOTE: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Authority 20 AAC25235 Form 10-422 Rev. 52009 DATE TIME VOLUME MSCF FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR 0 Planned > 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 1,953 Continuous Assist 0 Pilot and Purge 15,917 TOTAL FLARED/VENTED 17,870 10131/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 October -2017 PLANNED ACTION TAKEN TO MINIMIZE OF FLARING EVENT UNPLANNED VOLUME 11:09:17 AM GMF -06:00 1. Facility Number 0290000022 2. Facility Name CENTRAL PROCESSING FACILITY #1 3. Field Ku- roa River Unit 4 Operator CONOCOPHILLIPS COMPANY 5. MomMear of Disposition 11/30/1711:09:17 AM GMT -06:00 Disposition Volume MCF 20 For rvducfion fmm mu/tiple pools, list contribution of each oo/ as a went of Total Volume 6. Sold Pool Name Pcol Code Percent 7. Reinjected KUPARUKRIVER UNIT 490100 7240% 8. Flared or vented 1 hour or less KUPARUK RIVER UNIT MELTWATER 490140 12.15% 9. Flared or vented more than 1 hour see instr.) n14409 KUPARUK RIVER UNIT TARN 490160 15.23% 10. Pilot and Pure KUPARUK RIVER UNIT TABASCO 490165 0.23% 11. Assist Gas 100.00% 12. Fuel gas used in lease operations 709937 13. Other see instructions Official Use Only 14. TOTAL VOLUMES ITEMS 6-13 Authorization >l hr Safe MCF 15. NGL Gas Equivalent Lease Use MCF 16. Purchased as IM0 Conservation MCF 17. Transferred from: Waste: MCF 18. Transferred to: (Express as a negative # Commissioner Date 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 0. Line 6 is gas sold to KTC. I hereby certify that the foregoing is true and coned to the best of my knoWedge Signature `dine¢ Menduch6mi1 Title Analyst, PmducWn 8 Revenue Accounting Printed Name Diane Hendrickson Phone 918-661-7897 NOTE: All volumes most be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Aufthty 20 AAC25235 Form 10-422 Rev. 5/2009 11/30/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 November -2017 DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR 0 Planned > 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes Greater than 1 hour 0 Less than 1 hour 1,030 Continuous Assist 0 Pilot and Purge 14,409 TOTAL FLAREDNENTED 15,439 PLANNED ACTION TAKEN TO MINIMIZE UNPLANNED VOLUME CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) 11:09:17 AM GMT46:00 1. Facility Number 0290000022 2. Facility Name CENTRAL PROCESSING FACILITY#2 3. Flak Ku aruk River Unit 4 Operator ICONOCOPHILLIPS COMPANY 5. Moram Year of Disposition 1 12/3111712:38:28 PM GMT -0 M Disposition Volume MCF 20. Forproduction from multiple pools, list conln'oution ofeach pool ass percent of Total Volume 6. Sok 11046 Pool Name Pool Cade Percent 7. Reinjected 2774568 KUPARUKRIVER UNIT 490100 78.37% 8. Flared or vented l hour or less 346 KUPARUK RIVER UNIT MELTWATER 490140 9.64% 9. Flared or vented more than 1 hour less, instr.) 0 KUPARUK RIVER UNIT TARN 490160 11.79% 10. Pilot and Purge 13746 KUPARUK RIVER UNIT TABASCO 490165 0.20% 11. Assist Gas 100.00 12. Fuel gas used in lease operations 752460 13. Other see instructions) 0 Official Use Only 14. TOTAL VOLUMESITEMS 6-03 3552165 Authorizationt hr Safely MCF 15. NGL Gas Equivalent 0 Lease Use MCF 16. Purchased gas 01 MCF 17. Transferred from 0 waste: MCF 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on Ilne 17. Transferred from = PBU LSEOR NGLs 0 and CPFI transferred! 0. Line 6 is gas sold to KTC. I hereby certify that the foregoing is tore and correct to the best of my knowledge signature EriW Vr +w*,adel Printed Name Erin Vanarsdel Title Analyst, Produc0on # Revenue Armumhg Phone NOTE: All volumes must be ounected to pressure of 14.65 psis and to a temperature of 60 degrees F. Authority 20 AAC25235 Form 10422 Rev. 51209 CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f) 12131/2017 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 December -2017 PLANNED ACTION TAKEN TO MINIMIZE DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR Planned> 1 Hour PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes Greater than 1 hour 0 Less than 1 hour 346 Continuous Assist 0 Pilot and Purge 13,745 TOTAL FLAREDNENTED 14,091