STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED Gos niSpn-qiT1nti
1. Facility Number 2. Facility Name
0290000000 PE CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonlhNear of Disposition
BP Janua -2017
20. Forproduction tram multiple pools, list contribution oteach pool as a percent of
Total Volume.
6. Sold
705,652
Pool Name Pool Code Percent
7. Reinjected
216,350,186
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,242
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,988
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,097,317
13. Other (see instructions)
1,477
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
223,190,862
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from. CGF & FSI
223,190,862
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU, Block 12: Includes COTP Non-PBU Fuel Gas = 1,340 mscf BBlock
18: Fuel Gas to LPC = 1,477 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�,��n{ ���%� Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
Gtemperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
January 2017
I—via-111=u evencs less inan or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE
1/8/2017 0327-0344 ACTION 7AKENTOELIMINATE CAUSE
822 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 822
See attachments
See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION O (INCIDENT & CAUSE 71
1/21/2017 1027-1032ACTION TAKEN TO ELIMINATE CAUSE
420 See attachments See attachments
TOTAL 420
See attachments
TOTAL 0
See attachments
Page i
2/12/2017
5:13 PM
TOTAL
Unplanned Events < 1 Hour
822
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
420
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
0
Pilot Purge
34,988
Assist
0
TOTAL FLARED VOLUME
36,230
See attachments
Page i
2/12/2017
5:13 PM
Flare Start Date 01/01/2017
Flare End Date 01/31/2017
CCP Flare Report
Total Volume (MSCF) 1242
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-26 Controlled Blowdown 01/21/2017 10:27:00 am 10:32:00 am 5 min No
Determination Cause 1878 T/C shutdown and depressured to zero PSI for Mark VI upgrade.
Action Taken 1878 T/C slopped flaring at zero PSI.
Generated 02/02/2017 11:09:41 AM
No
Daily Volume (MSCF) 420
Total Volume (MSCF) 1242
Page 1 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT nF 00nni lf'Cn r•ALl r,��+.�..r..�.....
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
February 2017
events less than or equal to
---- -- Au TUN TAKEN TO ELIMINATE CAUSE
2/9/2017 0830-0835 408 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
TOTAL 408
Unplanned events greater than 1 hour
DATE TIME DESCRIPTION OFINCIDENT&CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
2/15/2017
0230-0235
152 See attachments
2/15/2017
1150-1155
152
2/15/2017
1324-1329
109
2/15/2017
1347-1352
408
2/17/2017
1948-1958
156
2/17/2017
2128-2133
11
2/18/2017
0242-0247
135
2/23/2017
0303-0308
141
2/23/2017
1803-1808
77
2/23/2017
2114-2119
156
2/23/2017
1143-1148
11
2/28/2017
1722-1727
77
2/28/2017
2056-2101
156
2/28/2017
2051-2056
11
TOTAL
1,752
Au IUN TAKEN TO I
See attachments
Page 1
3/15/2017
10:10 AM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
February 2017
UtSCRIPTION OF IN
See attachments
TOTAL 0
AGI ION TAKEN TOE
See attachments
Page 2
3/15/2017
10:10 AM
TOTAL
Unplanned Events <1 Hour
408
Unplanned Events> 1 Hour
0
Planned Events< 1 hour and not
1,752
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
31,627
Assist
0
TOTAL FLARED VOLUME
33,787
AGI ION TAKEN TOE
See attachments
Page 2
3/15/2017
10:10 AM
Flare StartDate 02/01/2017
Flare End Date 02/28/2017
CCP Flare Report
Total Volume (MSCF) 2760
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-48 Controlled Blowdown 02/15/2017 2:30:00 am 2:35:00 am 5 min No
No Yes BPIIKOSM80 152
Determination Cause TRC 1878 shutdown for planned maintenance after pressure check
Action Taken 1878 T/C depressurization completed.
17-48 Controlled Slowdown 02/15/2017 11:50:00 am 11:55:OOam 5min No
No Yes BP1\MASSIETS 152
Determination Cause TIC 1878 de-pressured for ESD test
Action Taken T/C 1878 de-pressurization completed.
17-48 Controlled Blowdown 02/15/2017 1:24:00 pm 1:29:00 pm -5min No
No Yes BP1\MASSIETS 109
Determination Cause T/C 1878 de-pressured for Type A/B Shutdown testing
Action Taken TIC 1878 de-pressurization completed.
17-48 Controlled Slowdown 02/15/2017 1:47:00 pm 1:52:00 pm 5 min No
No Yes BPIUMSSIETS 408
Determination Cause T/C 1878 shut down from sequence complete due to stuck nozzles.
Action Taken TIC 1878 de-pressurization completed.
Daily Volume (MSCF) 821
17-53 Controlled Slowdown 02/17/2017 7:48:00 pm 7:58:00 pm 10 min No
No Yes BPI\GAMBHO 156
Determination Cause TRC 1811 Shutdown for combustion inspection using F33 out of position shutdown. Planned fortesting.
Action Taken 1811 T/C depressurization completed.
17-53 Controlled Slowdown 02/17/2017 9:28:00 pm 9:33:00 pm 5min No
No Yes BPI\GAMBHO 11
Determination Cause TIC 1811 shutdown from spin cool and de-pressured to 0 psig.
Action Taken TIC 1811 de-pressurization complete.
17-54 Controlled Slowdown 02/18/2017 2:42:00 am 2:47:OOam 5min No
Daily Volume (MSCF) 167
No Yes BP1\GAMBHO 135
Determination Cause TIC 1805 shut down and de-pressured to 0 psig for quick deck installation.
Action Taken TIC 1805 de-pressurization complete.
Daily Volume (MSCF) 135
17-60 Controlled Slowdown 02/23/2017 3:03:00 am 3:08:00 am 5 min No
No Yes BPIITOWNER 141
Determination Cause 1804 T/C shutdown for quick deck installation.
Action Taken 1804 T/C Flaring stopped when depressured to zero PSI.
17-60 Controlled Slowdown 02/23/2017 6:03:00 pm 6:08:00 pm 5 min No
No Yes BPIRCLEMENC 77
Determination Cause TIC 1811 vent down from pressure test and blow down to crank pressure.
Action Taken TIC 1811 depressurization complete
17-60 Controlled Slowdown 02/23/2017 9:14:00 pm 9:19:00 pm 5 min No
No Yes BP1\TOWNER 156
Determination Cause 1810 T/C shutdown for watenwash and quick deck installation.
Action Taken 1810 T/C stopping depressuring at 50 PSI.
17-60 Controlled Slowdown 02/23/2017 11:43:00 pm 11:48:00 pm 5 min No
No Yes BP11TOWNER 11
Determination Cause 1810 TIC shutdown from spin cooling.
Action Taken 1810 T/C depressured to zero PSI and men stopped.
-
--� —��—
Generated 03/01/2017 3:11:04PM
Page 1 of 9
Flare Start Date 02/01/2017 _
Flare End Date 02/28/2017
Daily Volume (MSCF) 385
17-68 Controlled Blowdown 02/28/2017 5:22:00 pm 5:27:00 pm 5 min No No
Yes BPI\CLEMENC 77
Determination Cause TIC 1810 vent down from pressure test and blow down to crank pressure.
Action Taken TIC 1810 depressurization complete
17-68 Controlled Blowdown 02/28/2017 8:56:00 pm 9:01:00 pm 5 min No No
Yes BPt\TOWNER 156
Determination Cause 1812 TIC shutdown for water wash and depressured to 50 PSI.
Action Taken 1812 T/C stopped depressudng at 50 PSI.
17-68 Controlled Blowdown 02/28/2017 10:51:00 pm 10:56:00 pm 5 min No No
Yes BPIITOWNER 11
Determination Cause 1812 T/C stopped from spin cooling.
Action Taken 1812 T/C stopped venting at zero PSI.
Daily Volume (MSCF) 244
Total Volume (MSCF) 2160
Generated 03/01/2017 3:11:04PM
Page 2 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2. Facility Name
0290000000 PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP I March -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
693,284
Pool Name Pool Code Percent
7. Reinjected
220,542,877
PRUDHOE 640150 100.00°/
8. Flared or vented 1 hour or less
2,778
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
35,006
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,910,700
13. Other (see instructions)
0
Official Use Only
Authorization hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
227,184,645
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
227,184,645
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 439 mscf; Block 18:
Fuel Gas to LPC = 0 mscf
I hereby certify that theforegoing is true and correct to the best of my knowledge.
Signature �1 Q� y. Note: All volumes must be corrected
Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley temperature of 60o F. Authority 20
Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
March 2017
junplannea events less than or equal to 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/2/2017
1820-1825
156 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
3/13/2017
0950-0955
408
3/15/2017
0440-0445
408
3/31/2017
1305-1310
408
3/31/2017
1412-1416
109
3/31/2017
1805-1810
408
TOTAL
1,897
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
3/2/2017
3/3/2017
3/3/2017
3/4/2017
3/13/2017
3/13/2017
1555-1600
2120-2125
2315-2320
1848-1853
1342-1347
1900-1905
TOTAL
TOTAL
77 See attachments
156
11
77
408
152
881
See attachments
See attachments
See attachments
Page i
4/13/2017
10:32 AM
OD p
m v
m v
c c
m o
m o
a s
> >
s
m
m
v
C
n s
n s
n
3
0
n
x x
0 0
0
1
O
m a ro r
O V
E
Flare Start Date 03/01/2017
Flare End Data 03/31/2017
CCP Flare Report
Total Volume (MSCF) 2778
Report
Numbs
System Date
Start Time
Stop Time
Duration Intermittent Black Smoke Planned Reported By Volume
17-70
Controlled Blowdown 03/02/2017
3:55:00 pm
4:00:00 pm
5 min No No Yes BPIIBRAUJW 77
Determination Cause TIC 1812 de -pressured following pressure test
Action Taken TIC depressurization completed.
17-74 Flare Relief 03/03/2017 9:20:00 pm 925:00 pm 5 min No
Determination Cause nC 1809 depressured for water wash & maintenance.
Action Taken 1809 T/C depressurization completed.
17-74 Flare Relief 03/03/2017 11:15:00 pm 11:20:00 pm 5 min No
Determination Cause TIC 1809 stop from spin cooling
Action Taken 1809 T/C depressurization completed
17-73 Flare Relief 03/04/2017 6:48:00 pm 6:53:00 pm 5 min No
Determination Cause T\C 1809 pressure testing after maintenance
Action Taken 1809 T/C depressurization completed.
No Yes B!"IMAKERWF 156
No Yes BP1\BAKERWF 11
Daily Volume (MSCF) 167
No Yes 13MBAKERWF 77
Daily Volume (MSCF) 77
17-84 Flare Relief 03/13/2017 1:42:00 pm 1:47:00 pm 5 min No No Yes BPt\SLAUGL 408
Determination Cause TIC 1876 shutdown for planned maintenance. Vented from normal operating pressure to 175 psig.
Action Taken 1876 TIC depressurized and shut down.
17-84 Controlled Blowdown 03/13/2017 7:00:00 pm 7:05:00 pm 5 min No No Yes BPIIMANGMM 152
Determination Cause TIC 1876 done spin cooling.
Action Taken T/C 1676 depressurized and shut down.
Daily Volume (MSCF) 968
Generated 04/03/2017 4:36:08PM Page 1 of 7
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRnni irFn Irec mizonerrinki
1.
-
Facility Number 2. Facility Name
-- ---------
3. Field
v,.v v.V. VWl 1 IVI\
0290000000 PBU CCP/tion
PBU - EOA
4. Operator 5. Month/Year of Disposition
BP
Disposition
Volume MCF
Aril -2017
20. For production from multiple pools, list contribution of each pool as a percent of
6.
Sold
517,584
Total Volume.
Pool Name Pool Code Percent
7.
Reinjected
204,008,311
PRUDHOE 640150 100.00%
8.
Flared or vented 1 hour or less
3,696
9.
Flared or vented more than 1 hour (see instr.)
0
10.
Pilot and Purge
33,987
11.
Assist Gas
2,961
12.
Fuel gas used in lease operations.
5,731,364
13.
Other (see instructions)
373
Official Use Only
Authorization 11 hr: MCF
14.
TOTAL VOLUME (ITEMS 6-12)
210,298,276
Safety
15,
NGL Gas Equivalent
Lease Use MCF
0
16.
Purchased gas
Conservation MCF
0
Waste: MCF
17.
Transferred from: CGF 8 FS1
210,298,276
18.
Transferred to: (Express as a negative #)
0
Commissioner Date
19.
Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU;
Fuel
Block 12: Includes COTP Non-PBU Fuel as = 282 mscf, Block 18:
Gas to LPC = 373 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes be
Signature_
must corrected
Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley/
Phone (907) 564-5775
temperature of 60o F. Authority 20
Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
April 2017
Unplanned events less than or equal to 1 hour
0330-0335
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/1/2017 1010-1015
43 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
4/2/2017 1910-1915
109
1022-1027
4/3/2017 1408-1413
43
1241-1246
4/5/2017 1625-1630 -
109
1518-1525
4/5/2017 1658-1703
109
0105-0110
4/7/2017 1432-1437
408
0412-0417
4/9/2017 2335-2340
420
1055-1100
4/10/2017 0018-0021
109
1635-1640
TOTAL
1,350
1855-1900
Unplanned events greater than 1 hour
4/16/2017
1210-1215
DATE TIME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
45
See attachments
See attachments
TOTAL
0
2015-2020
4/5/2017
0330-0335
109 See attachments
4/5/2017
1235-1240
43
4/13/2017
0755-0800
135
4/13/2017
1022-1027
14
4/14/2017
1241-1246
135
4/14/2017
1518-1525
14
4/15/2017
0105-0110
408
4/15/2017
0412-0417
109
4/15/2017
1055-1100
109
4/15/2017
1635-1640
135
4/15/2017
1855-1900
14
4/16/2017
1210-1215
8
4/16/2017
1252-1257
45
4/17/2017
1537-1542
45
4/17/2017
2015-2020
135
4/17/2017
2233-2238
14
4/18/2017
0803-0808
135
4/18/2017
0950-0955
8
4/18/2017
2036-2041
135
See attachments
Page 1
5/14/2017
2:06 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
April 2017
4/18/2017
2235-2240
14
4/20/2017
0244-0249
45
4/20/2017
1035-1040
135
4/20/2017
1225-1230
14
4/22/2017
2334-2339
45
4/23/2017
1025-1030
135
4/23/2017
1220-1225
14
4/24/2017
1755-1800
45
4/24/2017
2045-2050
135
4/24/2017
2231-2236
14
TOTAL 2,346
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE
See attachments See attachments
TOTAL n
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
1,350
2,346
33,987
2,961
40,644
Page 2
5/14/2017
2:06 PM
Flare Start Date 04/01/2017
Flare End Date 04/30/2017
CCP Flare Report Total Volume(MSCF) 3696
Report
Numbs System Data Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-103 Controlled Blowtimn 04/05/2017 3:30:00 am 3:35:00 am 5 min No
Determination Cause T\C 1876 vented down from pressure test.
Action Taken T/C 1876 depressurization completed.
17-103 Controlled Blowdown 04/05/2017 12:35:00 pm 12:40:00 pm 5 min No
Determination Cause T\C 1876 given an ESD from 175 psi for testing.
Action Taken TIC 1876 depressurization completed.
No
Yes BP1\MANGMM 109
No Yes BPIWIANGMM 43
Controlled Blowdown 04/13/2017 7:55:00 am 8:00:00 am 5 min No No Yes BP1\STEPT2 135
Determination Cause T\C 1813 shuttkwm for planned maintenance
Action Taken 1813 T/C depressurization completed.
Generated 05/02/2017 1:16:36PM Page 1 of 10
Flare Start Date 04/01/2017
Determination Cause
TIC 1876 shut down from spin cool and depressured to 0 psig.
Flare End Date 04/30/2017
TIC 1876 de -pressurization complete.
17-119 Controlled Slowdown 04/16/2017 12:10:00 pm 12:15:00 pm 5 min No No
17-115 Controlled Blowdown 04/13/2017 10:22:00 am 1027:00 am 5 min No
No Yes BP7\STEPT2
14
Determination Cause -RC 1813 spin cooling
17-119 Controlled Slowdown 04/16/2017 12:52:00 pm 12:57:00 pm 5 min No No
Determination Cause
Action Taken 1813 TIC depressurization completed.
Action Taken
1813 TIC depressurization completed.
Determination Cause T\C 1801 shutdown and depressured to 50 psig for waterwash.
Daily Volume (MSCF)
149
17-116 Controlled Slowdown 04/14/2017 12:41:00 pm 12:46:00 pm 5 min No
No Yes SPI\STEPT2
135
Determination Cause TC 1808 depressured for water wash - OSD using hi discharge temp SID
for CASIS testing
14
Action Taken 1808 TIC depressurization completed.
17-116 Controlled Blowdown 04/14/2017 3:18:00 pm 3:25:00 pm 7 min No
No Yes BP7\STEPT2
14
Determination Cause T\C 1808 spin cooling complete
Action Taken 1808 TIC depressurization completed.
Daily Volume (MSCF)
149
17-118 Controlled Blowdown 04/15/2017 1:05:00 am 1:10:00am 5 min No
No Yes BPI\GAMBHO
408
Determination Cause Shut down and de -pressured TIC 1876 to 175 psig for water wash.
Action Taken TIC 1876 depressurization complete.
17-118 Controlled Blowdown 04/15/2017 4:12:00 am 417:00 am 5 min No
No Yes BP1\GAMBHO
109
Determination Cause Shut down TIC 1876 from spin cool and de -pressured to 175 psig.
Action Taken TIC 1876 de -pressurization complete.
17-118 Controlled Blowdown 04/15/2017 10:55:00 am 11:00:00 am 5 min No
No Yes BP1\STEPT2
109
Determination Cause De -pressured 1876 to 175 psig after completion of water wash
Action Taken 1876 TIC depressurization completed.
17-118 Controlled Slowdown 04/15/2017 4:35:00 pm 4:40:00 pm 5 min No
No Yes BP11STEPT2
135
Determination Cause T\C 1807 depressured for water wash using hi discharge temp SID for CASIS testing.
Action Taken 1807 TIC depressurization completed.
17-118 Controlled Slowdown 04/15/2017 6:55:00 pm 7:00:00 pm 5 min No No
Determination Cause
TIC 1876 shut down from spin cool and depressured to 0 psig.
Action Taken
TIC 1876 de -pressurization complete.
17-119 Controlled Slowdown 04/16/2017 12:10:00 pm 12:15:00 pm 5 min No No
Determination Cause
TC 1813 water wash complete, blow down to 50 psig.
Action Taken
1813 TIC depressurization completed.
17-119 Controlled Slowdown 04/16/2017 12:52:00 pm 12:57:00 pm 5 min No No
Determination Cause
T\C 1813 de -pressured to 50 psig after system pressure test.
Action Taken
1813 TIC depressurization completed.
Yes BP7\GAMBHO 14
Daily Volume (MSCF) 775
Yes BP7\STEPT2 45
Determination Cause TIC 1801 shutdown from spin cool and de -pressured to 0 psig
Action Taken TIC 1801 de -pressurization complete.
Generated 05/02/2017 1:16:36PM Page 2 of 10
Daily Volume (MSCF)
53
17-123 Controlled Blowdown 04/17/2017 3:37:00 pm 3:42:00 pm 5 min No
No Yes BP1\STEPT2
45
Determination Cause TC 1807 de -pressured from system pressure test
Action Taken 1807 TIC depressurization completed.
17-123 Controlled Blowdown 04/17/2017 8:15:00 pm 8:20:00 pm 5 min No
No Yes BP1\GAMBHO
135
Determination Cause T\C 1801 shutdown and depressured to 50 psig for waterwash.
Action Taken TIC 1801 depressunzation complete
17-123 Controlled Blowdown 04/17/2017 10:33:00 pm 10:38:00 pm 5 min No
No Yes BP1\GAMBHO
14
Determination Cause TIC 1801 shutdown from spin cool and de -pressured to 0 psig
Action Taken TIC 1801 de -pressurization complete.
Generated 05/02/2017 1:16:36PM Page 2 of 10
Flare Start Date 04/012017
Flare End Date 04/30/2017
17-125 Controlled Slowdown 04/18/2017 8:03:00 am 8:08:00 am 5 min No No
Determination Cause -RC 1804 depressured for waterwash
Action Taken 1804 TIC depressurization completed.
17-125 Controlled Blowdown 04/18/2017 9:50:00 am 9:55:00 am 5 min No No
Determination Cause 'RC 1804 spin coaling complete. De -pressured to 50#
Action Taken 1804 T/C depressurization completed.
Daily Volume (MSCF) 194
Yes BP1\STEPT2 8
17-125 Controlletl Blowdown 04/18/2017 8:36:00 pm 8:41:00 pm 5 min No No Yes BPI\GAMSHO 135
Determination Cause TIC 1803 shut down and de -pressured to 50 psig for spin cool, water wash and maintenance.
Action Taken T/C 1803 de-pressudzation complete.
17-125 Controlled Slowdown 04118/2017 10:35:00 pm 10:40:00 pm 5 min No No Yes SP1\GAMBHO 14
Determination Cause T/C 1803 shut down from spin cool and de -pressured to 0 psig.
Action Taken TIC 1803 de -pressurization complete.
17-127 Controlled slowdown 04/20/2017 2:44:00 am 2:49:00 am 5 min No No
Determination Cause 1803 T/C depressured from suction pressure to holding pressure following leak testing.
Action Taken 1803 TIC stopped venting at 50 PSI.
17-127 Controlled Blowdown 04/20/2017 10:35:00 am 10:40:00 am 5 min No No
Determination Cause 1802 SID for water wash.
Action Taken 1802 TIC depressurized complete.
17-127 Controlled Slowdown 0420/2017 12:25:00 pm 12:30:00 pm 5 min No No
Determination Cause
T/C 1802 spin cool.
Action Taken
TIC 1802 spin cool stop.
17-131 Controlled Slowdown 0422/2017 11:34:00 pm 11:39:00 pm 5 min No No
Determination Cause
1802 T/C pressured up to 500 PSI for leak testing then depressured to 50 PSI,
Action Taken
1802 TIC stopped flaring at 50 PSI,
17-132 Controlled Slowdown 04123/2017 10:25:00 am 10:30:00 am 5 min No No
Determination Cause
T\C 1806 shutdown for planned maintenance, Water wash. Vent to 50 psi
Action Taken
-RC 1806 vent completed
17-132 Controlled slowdown 04/232017 12:20:00 pm 12:25:00 pm 5 min No
Determination Cause
TIC 1806 spin cool stop. Vent to 0 psig, Water wash
Action Taken
T/C 1806 venting completed
17-133 Controlled Slowdown 04/24/2017 5:55:00 pm 6:00:00 pm 5 min No
Determination Cause
1806 T/C Stop from leak testing. Vent from suction PSI to 50 PSI.
Action Taken
1806 T/C venting completed
17-133 Controlled Slowdown 0424/2017 8:45:00 pm 8:50:00 pm 5 min No
Determination Cause
1805 T/C shutdown for water wash. Depressured to 50 PSI.
Action Taken
1805 T/C stopped flaring at 50 PSI.
17-133 Controlled Slowdown 04/2412017 10:31:00 pm 10:36:00 pm 5 min No
Determination Cause 1805 TIC Stopped spin cooling. Depressured to zero PSI.
Daily Volume (MSCF) 292
Yes BPt\TOWNER 45
Yes BP1\CLEMENC 135
Yes BPi\CLEMENC 14
Daily Volume (MSCF) 194
Yes BPI\TOWNER 45
Daily Volume (MSCF) 45
Yes BP1\CLEMENC 135
No Yes SP1\CLEMENC 14
No
No
Daily Volume (MSCF) 149
Yes BP1\TOWNER 135
No Yes BP1\TOWNER 14
Generated 05/022017 1:16:36PM Page 3 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPnSITInN
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator •
BP
5. MonthNear of Disposition
Ma -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
445,158
Pool Name Pool Code Percent
7. Reinjected
206,043,061
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
475
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
34,962
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,975,640
13. Other (see instructions)
0
Official Use Only
Authorization >l hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
212,499,296
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
212,499,296
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19, Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU, Block 12: Includes COTP Non-PBU Fuel Gas = 825 mscf; Block 18:
Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�.�i,� Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564 - Date I AAC25.235.
5775
Form 1OA22 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
May 2017
junplannea events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
UESCRIPTION OF IN
See attachments
See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/18/2017 2201-2241 475 See attachments See attachments
TOTAL 475
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
A
TOTAL
0
0
475
0
34,962
0
35,437
See attachments
See attachments
Page 1
6/14/2017
1:58 PM
Flare StartDate 05/01/2017
Flare End Date 05131/2017
CCP Flare Report
Total Volume (MSCF)
475
Report
Numbe System Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
17-176 Controlled Slowdown 05/18/2017 10:01:00 pm
10:41:00 pm 40 min No
No Yes BP1\TOWNER
475
Determination Cause Depressured FFGU inlet separators and contactors for PSV PM's. Depressured
from 600 PSI to zero PSI. Meter 620
Action Taken FFGU Flaring stopped at zero PSI.
Daily Volume (MSCF)
475
Total Volume (MSCF)
476
Generated 06/09/2017 2:22:08PM Page 1 of 9
Flare Start Date 05/01/2017
Flare End Date 05/31/2017
CCP Flare Report
Total Volume (MSCF)
475
Report
Numbs System Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
17-176 Controlled Blowdown 05/18/2017 10:01:00 pm
10:41:00 pm 40 min No
No Yes BPI\TOWNER
475
Determination Cause Depressured FFGU inlet separators and contactors for PSV PM's. Depressured
from 600 PSI to zero PSI. Meter 620
Action Taken FFGU 6adng stopped at zero PSI.
Daily Volume (MSCF)
475
Total Volume (MSCF)
475
Generated 06/09/2017 2:22:08PM Page 1 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAR o1Rpns1T1nti
1. Facility Number 2. Facility Name
0290000000 P13 CCPlFFGU
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator • 5. Monthlyear of Disposition
BP June -2017
20. For production from multiple pools, list contribution of each pool as a pement of
Total Volume.
6. Sold
406,313
pool Name Pool Code Percent
7. Reinjected
179,019,559
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
3,772
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
33,888
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,309,881
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
184,773,413
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
IT Transferred from: CGF & FS1
184,773,413
Commissioner Dale
18. Transferred to: (Express as a negative #)
01
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 544 mscf; Block 18:
Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
l Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC. Page 1
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
June 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/23/2017 0820-0825 156 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
6/29/2017 0456-0526 2,780
TOTAL 2,936
TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO I
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1
hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/3/2017 0610-0615
156
See attachments
See attachments
6/3/2017 1143-1148
156
6/3/2017 1517-1519
2
6/3/2017 1631-1636
156
6/9/2017 0331-0336
135
6/9/2017 0542-0547
8
6/9/2017 1227-1232
6
6/10/2017 0110-0115
45
6/10/2017 0123-0128
8
6/22/2017 2256-2301
156
6/23/2017 1045-1050
8
TOTAL
836
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
7/18/2017
11:37 AM
D
g
C C
O
x v
a
J J
D •• v
n m
a m
w a
J J
5 00
pp m
00
N N
T c
c
I I
�^
o
v
00
a
i i
J
0
-i
0
V W N D
0 o w o m o m
A
Flare Start Date 06/01/2017
Flare End Date 06/30/2017
CCP Flare Report
Total Volume (MSCF) 3772
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-191 Controlled Blowdown 06/03/2017 6:10:00 am 6:15:00 am 5 min
No No
Yes
BP1\SLAUGL
156
Determination Cause 1812 depressured for water wash.
Action Taken 1812 depressurization complete.
17-191 Controlled Blowdown O610312017 1143:00 am 11:48:00 am 5 min
No No
Yes
BPI\TOWNER
156
Determination Cause 1810 TIC shutdown and depressured for water wash.
Action Taken 1810 TIC stopped depressudng at 50 PSI.
17-191 Controlled Blowdown 06/03/2017 3:17:00 pm 3:19:00 pm 2 min
No No
Yes
BP1\TOWNER
2
Determination Cause 1810 TIC vented down from 225 PSI to 179 PSI due to high cranking pressure.
Action Taken 1810 T/C stopped venting at 179 PSI.
17-191 Controlled Blowdown 06/03/2017 4:31:00 pm 4:36:00 pm 5 min
No No
Yes
BP7\TOWNER
156
Determination Cause 1809 T/C shutdown and depressured for water wash.
Action Taken 1809 T/C stopped venting at 50 PSI,
Daily Volume (MSCF)
470
17-202 Controlled Blowdown 06/09/2017 3:31:00 am 3:36:00 am 5min
No No
Yes
BP1\TOWNER
135
Determination Cause 1803 TIC shutdown for seal oil check valve repair.
Action Taken 1803 T/C depressured to 50 PSI and then stopped,
17-202 Controlled Blowdown 06/09/2017 5:42:00 am 5:47:00 am 5min
No No
Yes
BP1\TOWNER
8
Determination Cause 1803 T/C shutdown from spin cooling.
Action Taken 1803 T/C depressured to 50 PSI and then stopped venting.
17-202 Controlled Blowdown 06/09/2017 12:27:00 pm 12:32:00 pm 5 min
No No
Yes
BP1\TOWNER
6
Determination Cause 1803 TIC depressured from 50 PSI to zero for seal oil check valve repair.
Action Taken 1803 T/C stopped venting at zero PSI.
17-204 Controlletl Blowdown 06/10/2017 1:10.00 am 1:15:00 am 5 min No No
Determination Cause 1803 T/C depressured after leak test.
Action Taken 1803 TIC stopped venting at 50 PSI.
17-204 Controlled Blowdown 06/10/2017 1:23:00 am 1:28:00 am 5 min No No
Determination Cause 1803 T/C normal stop during startup sequence.
Action Taken 1803 T/C depressured to holding pressure and stopped,
17-215 Controlletl Blowdown 06/22/2017 10:58:00 pm 11:01:00 pm 5 min No No
Determination Cause T\C 1811 shutdown due to a problem associated with IGV out of position trip.
Action Taken 1811 T/C depressurization completed.
Daily Volume (MSCF) 149
Yes BP7\TOWNER 45
Yes BPt\TOWNER 8
Daily Volume (MSCF) 53
Yes BP1\WALK54 156
Daily Volume (MSCF) 156
17-216 Controlled Blowdown 06/23/2017 10:45:00 am 10:50:00 am 5 min No No Yes BPIWANGMM 6
Determination Cause TIC 1811 depressured from spin cool.
Action Taken T/C 1811 depressunzed and shut down.
Generated 07/06/2017 2:44:22PM Page 1 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED roe nigpnsiTinti
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator . v •
BP
5. MonthNeDisposition
Juar lof -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
408,157
pool Name Pool Code Percent
7. Reinjected
142,014,281
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
2,611
9. Flared or vented more than 1 hour (see their.)
301
10. Pilot and Purge
35,080
11. Assist Gas
0
12. Fuel gas used in lease operations.
4,757,512
13. Other (see instructions)
21,812
Official Use Only
Authorization>1 hr:
Safely
3G �
MCF V
101 /
14. TOTAL VOLUME (ITEMS 6-12)
147,239,754
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
147,239,754
/ /
Commissioner Date
18. Transferred to: (Express as a negative 9)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,743 mscf; Block
18: Fuel Gas to LPC = 21,812 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�,(/)� D////.// , Note: All volumes must be corrected
Signature �' '^- �4-C�t+� Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psla and to a
I temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5r2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
July 2017
7/18/2017
0030-0035
156 Not required for unplanned events <=1 hr
7/19/2017
1925-1930
109
7/20/2017
0442-0447
6
7/21/2017
0400-0405
135
7/21/2017
0513-0518
6
7/21/2017
0605-0610
8
7/21/2017
1731-1736
6
7/22/2017
0453-0458
6
7/22/2017
1652-1657
6
7/23/2017
0506-0511
6
7/23/2017
1921-1926
6
7/24/2017
1504-1509
6
7/25/2017
0426-0431
6
7/25/2017
2259-2304
16
7/25/2017
1412-1417
6
TOTAL
484
TIME
See attachments
TOTAL 0
DATE
TIME
VOLUME DESCRIPTION OF IN,
7/13/2017
0223-0228
141 See attachments
7/13/2017
1142-1147
23
7/14/2017
0354-0359
156
7/14/2017
0608-0613
11
7/14/2017
1340-1345
135
7/14/2017
1636-1641
14
7/15/2017
1328-1333
135
7/15/2017
1601-1606
8
7/18/2017
0739-0744
6
7/19/2017
1058-1103
408
7/19/2017
1508-1513
109
7/19/2017
1618-1623
109
Not required for unplanned events <= 1 hr
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
8/16/2017
10:26 AM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
July 2017
7/19/2017
1709-1714
109
7/19/2017
1754-1759
109
7/19/2017
1816-1821
109
7/20/2017
1010-1015
109
7/20/2017
1514-1519
109
7/20/2017
1711-1716
6
7/21/2017
1442-1447
14
7/23/2017
1800-1805
37
7/27/2017
1305-1310
135
7/27/2017
1929-1934
135
TOTAL
2,127
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT 8, CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/16/2017 0515-0830
301 See attachments See attachments
TOTAL
301
TOTAL
Unplanned Events < 1 Hour
484
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
2,127
exceeding 5,000 MCF
Planned Events > 1 hour or
301
exceeding 5,000 MCF
Pilot Purge
35,080
Assist
0
TOTAL FLARED VOLUME
37,992
Page 2
8/16/2017
10:26 AM
Flare Start Date 07/01/2017
Flare End Date 07/31/2017
CCP Flare Report Total Volume (MSCF) 2912
Report
07/14/2017 1:40:00 pm 1:45:00 pm 5 min No
No
Yes BPI\GAMSHO
135
Determination Cause
Shut down TIC 1804 for maintenance. De -pressured to 53 psig.
Numbe System
Date Start Time Stop Time
Duration
Intermittent
Black Smoke
Planned
Reported By
Volume
17-264 Other
07/13/2017 2:23:00 am 2:28:00 am
5min
No
No
Yes
BPt\BRAUJW
141
Determination Cause
M 1805 shutdown for planned maintenance
T/C 1804 depressurization complete.
Action Taken
TIC 1805 depressurized and shut down.
316
17-272 Other
07/15/2017 1:28:00 pm 1:33:00 pm 5 min No
No
Yes BPI\GAMBHO
135
17-264 Other
07/13/2017 11:42:00 am 114700 am
5 min
No
No
Yes
BPI\GAMBHO -
23
Determination Cause
P37 used to keep flare lit while blowing down N2 purge on T/C 1805.
17-272 Other
07/15/2017 4:01:00 pm 4:06:00 pm 5 min No
No
Yes BP1\GAMBHO
Action Taken
N2 blow downs on T/C 1805 complete.
TIC 1808 de -pressured to 50 psig from a spin cool stop.
Action Taken
TIC 1808 de -pressurization complete.
Daily Volume (MSCF)
164
17-267 Other
07/14/2017 3:54:00 am 3:59:00 am
5 min
No
No
Yes
BP1\BRAUJW
156
Determination Cause
T\C 1811 Shutdown for planned maintenance
Action Taken
De -pressurization complete.
Action Taken
T/C 1811 depressurized and shutdown.
Daily Volume (MSCF)
301
17-277 Other
07/18/2017 7:39:00 am 7:44:00 am 5 min No
No
Yes BP7\GAMBHO
17-267 Other
07/14/2017 6:08:00 am 6:13:00 am
5 min
No
No
Yes
BP1\BRAUJW
11
Determination Cause
TC 1811 shutdown from spin cooling
Daily Volume (MSCF)
162
Action Taken
T/C 1811 depressurized and shut down.
Yes BP1\WALK54
408
Determination Cause
T\C 1876 depiessured forwater wash
17-267 Other
07/14/2017 1:40:00 pm 1:45:00 pm 5 min No
No
Yes BPI\GAMSHO
135
Determination Cause
Shut down TIC 1804 for maintenance. De -pressured to 53 psig.
Action Taken
T/C 1804 depressurization complete.
17-267 Other
07/14/2017 4:36:00 pm 4:41:00 pm 5 min No
No
Yes BP1\GAMBHO
14
Determination Cause
Shut down spin cool on T/C 1804 and depressured to 0 psig.
Action Taken
T/C 1804 depressurization complete.
Daily Volume (MSCF)
316
17-272 Other
07/15/2017 1:28:00 pm 1:33:00 pm 5 min No
No
Yes BPI\GAMBHO
135
Determination Cause
TIC 1808 shut down for maintenance and de -pressured to 50 psig.
Action Taken
TIC 1808 de -pressurization complete.
17-272 Other
07/15/2017 4:01:00 pm 4:06:00 pm 5 min No
No
Yes BP1\GAMBHO
8
Determination Cause
TIC 1808 de -pressured to 50 psig from a spin cool stop.
Action Taken
TIC 1808 de -pressurization complete.
Daily Volume (MSCF)
143
17-276 Other
07/16/2017 5:15:00 am 8:30:00 am 195 min No
No
Yes BP1\GAMBHO
301
Determination Cause
De -pressured NGI injection lines from wells to FFGU contactors for NGI valve replacement
project.
Action Taken
De -pressurization complete.
Daily Volume (MSCF)
301
17-277 Other
07/18/2017 7:39:00 am 7:44:00 am 5 min No
No
Yes BP7\GAMBHO
6
Determination Cause
De -pressured T/C 1808 from 48 psig holding pressureto 0 psig.
Action Taken
T/C 1808 de -pressurization complete.
Daily Volume (MSCF)
162
17-278 Controlled Blowdown 07/19/2017 10:58:00 am 11:03:00 am 5 min No
No
Yes BP1\WALK54
408
Determination Cause
T\C 1876 depiessured forwater wash
Generated 08/15/2017
1:28:23PM
Page 1 of 15
Flare Start Date 07/01/2017
Flare End Date 07/31/2017
Action Taken 1876 T/C depressurization completed.
17-278 Controlled Blowdown 07/19/2017 3:08:00 pm 3:13:00 pm 5 min No No
Yes BPMALK54
109
Determination Cause T\C 1876 depressured forwaterwash
Action Taken 1876 T/C depressurization completed.
17-278 Controlled Blowdown 07/19/2017 4:18:00 pm 4:23:00 pm 5 min No No
Yes BP1\WALK54
109
Determination Cause -RC 1876 depressured for water wash
Action Taken 1876 T/C depressurization completed.
17-278 Controlled Blowdown 07/19/2017 5:09:00 pm 5:14:00 pm 5 min No No
Yes BPI\WALK54
109
Determination Cause TC 1876 shutdown due to a problem associated with LP over -speed loss of signal trip.
Action Taken 1876 TIC depressurization completed.
17-278 Controlled Blowdown 07/19/2017 5:54:00 pm 5:59:00 pm 5 min No No
Yes BPI\WALK54
109
Deternination Cause T\C 1876 shutdown due to a problem associated with over -speed loss of signal trip.
Action Taken 18#76T/C depressurization completed.
17-278 Controlled Slowdown 07/19/2017 6:16:00 pm 6:21:00 pm 5 min No No
Yes BPI\WALK54
109
Determination Cause T/C 1876 tripped on LP backup up over speed trouble trip signal loss. Vented to crank pressure from suction.
Action Taken 1876 T/C depressurization completed.
Daily Volume (MSCF)
1062
17-279 Controlled Blowdown 07/20/2017 10:10:00 am 10:15:00 am 5 min No No Yes BPI\WALK54 109
Determination Cause T/C 1876 tripped on LP backup up over speed trouble trip signal loss. Vented to crank pressure from suction.
Action Taken 1876 T/C depressurization completed.
17-279 Controlled Blowdown 07/20/2017 3:14:00 pm 3:19:00 pm 5 min No No Yes BP1\WALK54 109
Determination Cause T/C 1876 tripped on LP backup up over speed trouble trip signal loss. Vented to crank pressure from suction.
Action Taken 1876 T/C depressurization completed.
17-279 Controlled Blowdown 07/20/2017 5:11:00 pm 5:16:00 pm 5 min No No Yes BP1\WALK54 6
Determination Cause T/C 1808 de -pressured from 28 psi to 0 psi due to F57 -V leaking thru.
Action Taken 1808 T/C depressurization completed.
Daily Volume (MSCF) 230
17-281 Controlled Blowdown 07/21/2017 2:42:00 pm 2:47:00 pm 5 min No No Yes BP1\WALK54 14
Generated 08/15/2017 1:28:23PM Page 2 of 15
Flare Start Date 07/01/2017
Flare End Date 07/31/2017
Determination Cause T/C 1803 Shut down and vented from crank to zero PSIG after water wash for seal oil work.
Action Taken 1803 T/C depressurization completed.
17-288 Controlled Blowdown 07/23/2017 6:00:00 pm 6:05:00 pm 5 min No No Yes BP1WEPT2 37
Determination Cause FFGU started to de -pressure FFGU through P10AV using P15. Leak testing of 187/188
Action Taken De -pressure complete per plan
17-298 Controlled Blowdown 07/27/2017 1:05:00 pm 1:10:00 pm 5 min No No Yes BPIISTEPT2 135
Determination Cause TIC 1807 depressured for water wash.
Action Taken 1807 T/C depressurization completed for water wash.
17-298 Controlled Blowdown 07/27/2017 7:29:00 pm 7:34:00 pm 5 min No No Yes BPI\SLAUGL 135
Determination Cause T/C 1806 depressured for water wash.
Generated 08/15/2017 1:28:23PM Page 3 of 15
Flare Start Date 07/01/2017
Flare End Date 07/31/2017
Action Taken T/C 1806 deprewudng complete.
Daily Volume (MSCF) 270
Total Volume (MSCF) 2912
Generated 08/15/2017 1:28:23PM Page 4 of 15
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY RFPART nF PPrnni lf%=n f% -AQ nlcon�ITlr,a
1.
- - - - --- — -
Facility Number 2. Facility Name
—• . .�v vrsv ✓rvr %J'71 1 IVIY
0290000000 PBU CCP/FFGU
3. Fieltl
PBU - EOA
4. Operator 5. MonthNear of Disposition
BP
Disposition
Volume MCF
August -2017
20. For production fmm multiple pools, list contnbution of each pool as a percent of
6.
Sold
420,998
Total Volume.
Pool Name Pool Code Percent
7.
Reinjected
150,449,178
PRUDHOE 640150 100.00%
8.
Flared or vented 1 hour or less
437
9.
Flared or vented more than 1 hour (see instr.)
0
10.
Pilot and Purge
35,075
11.
Assist Gas
0
12.
Fuel gas used in lease operations.
4,541,397
13.
Other (see instructions)
0
018cial Use Only
Authorization>1 hr: MCF
14.
TOTAL VOLUME (ITEMS 6-12)
155,447,085
Safety
15.
NGL Gas Equivalent
Lease Use MCF
0
16.
Purchased gas
Conservation MCF
0
Waste: MCF
17.
Transferred from: CGF & FS1
155,447,085
18.
Transferred to: (Express as a negative #)
0
Commissioner Date
19.
Remarks: Block Includes Gas Sales Alyeska Pipeline, Norgasco, Northstar and KRU,
l
Block 12: Includes COTP Non-PBU Fuel Gas = 1,248 mscf; Block
18: Fuel Gas to LPC = 0 mscf
1 hereby certify that t foregoing is true and correct to the best of my knowledge.
Signature_
Note: All volumes must be corrected
Title Manager Production Taxes and Rovalties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley
Phone
g I -'I temperature of 60o F. Authority 20
(907) 564-5775
Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
August 2017
8/18/2017 0315-0320
6 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
TOTAL
6
0
Planned Events < 1 hour and not
431
exceeding 5,000 MCF
Unplanned events greater than 1 hour
Planned Events> 1 hour or
0
DATE TIME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
35,075
See attachments
See attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/9/2017 0340-0345
45 See attachments
See attachments
8/9/2017 0804-0810
45
8/13/2017 1550-1555
80
8/14/2017 0910-0915
8
8/14/2017 2312-2317
45
8/17/2017 1000-1005
8
8/17/2017 1530-1535
135
8/19/2017 1310-1315
6
8/24/2017 0930-0935
51
8/24/2017 1530-1535
8
TOTAL
431
See attachments
TOTAL 0
See attachments
Page 1
9/14/2017
4:31 PM
TOTAL
Unplanned Events < 1 Hour
6
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
431
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
35,075
Assist
0
TOTAL FLARED VOLUME
35,512
See attachments
Page 1
9/14/2017
4:31 PM
Flare Start Date 08/01/2017
Daily Volume (MSCF)
Flare End Date 08/31/2017
80
17-325 Controlled Blowdown 08/14/2017 9:10:00 am 9:15:00 am
CCP Flare Report
No No
Yes BP1\CLEMENC
8
Total Volume (MSCF)
437
Report
Action Taken T/C 1811 blow down complete
Numbe System Date Start Time Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
17-315 Controlled Blowdown 08/09/2017 340:00 am 34500am 5min No
No Yes BP1\GREGWD
45
Determination Cause TRC 1808 depressured for water wash
45
Determination Cause T\C 1804 pressure testing after maintenance.
Action Taken 1808 T/C depressurization completed.
Action Taken
17-315 Controlled Blowdown 08/09/2017 8:04:00 am 8:10:00 am 6 min No
No Yes BP1\STEPT2
45
Determination Cause T\C 1808 depressured after high pressure testing
No Yes BPI\MANGMM
8
Action Taken 1808 TIC depressurization completed after testing.
TRC 1805 depressured from water wash
Daily Volume (MSCF)
Daily Volume (MSCF)
90
17-324 Controlled Blowdown 08/13/2017 3:50:00 pm 3:55:00 pm 5 min No
No Yes BPI\CLEMENC
80
Determination Cause T/C 1811 Blow down from full suction pressure test to 0 pressure
Determination Cause TIC 1804 shutdown due from water wash
59
Action Taken T/C 1811 Blow down complete.
4:06:25PM
Page 1 of 11
Daily Volume (MSCF)
Daily Volume (MSCF)
80
17-325 Controlled Blowdown 08/14/2017 9:10:00 am 9:15:00 am
5 min
No No
Yes BP1\CLEMENC
8
Determination Cause TIC 1811 tripped from crank pressure due to DC lube oil pump issues... Blow down to 50 psi...
Action Taken
TIC 1808 depressurization completed.
Action Taken T/C 1811 blow down complete
Daily Volume (MSCF)
17-325 Controlled Blowdown 08/14/2017 11:12:00 pm 11:17:00 pm
5 min
No No
Yes BPIRBAKERWF
45
Determination Cause T\C 1804 pressure testing after maintenance.
Action Taken
T/C 1805 depressured and shut down.
Action Taken 1804T/C depressurization Completed.
17-340 Controlled Blowdown 08/24/2017 3:30:00 pm 3:35:00 pm 5 min No
No Yes BPI\MANGMM
8
Determination Cause
TRC 1805 depressured from water wash
Daily Volume (MSCF)
53
17-334 Controlled Blowdown 08/17/2017 10:00:00 am 10:05:00 am
5 min
No No
Yes BP1\MANGMM
8
Determination Cause TIC 1804 shutdown due from water wash
59
Generated 09/062017
4:06:25PM
Page 1 of 11
Action Taken TIC 1804 depressurized and shut down.
17-334 Controlled Blowdown 08/17/2017 3:30:00 pm 3:35:00 pm
5 min
No No
Yes SPI MANGMM
135
Determination Cause T\C 1808 shutdown for planned maintenance
Action Taken T/C 1808 depressurized and shut down.
Daily Volume (MSCF)
143
17-337 Controlled Blowdown 08/19/2017 1:10:00 pm 1:15:00 pm 5 min No
No Yes BP1\MANGMM
6
Determination Cause
TC 1808 depressured for valve maintenance.
Action Taken
TIC 1808 depressurization completed.
Daily Volume (MSCF)
6
17-340 Controlled Blowdown 08/24/2017 9:30:00 am 9:35:00 am 5 min No
No Yes BP1\MANGMM
51
Determination Cause
T\C 1805 shutdown from full suction pressure check.
Action Taken
T/C 1805 depressured and shut down.
17-340 Controlled Blowdown 08/24/2017 3:30:00 pm 3:35:00 pm 5 min No
No Yes BPI\MANGMM
8
Determination Cause
TRC 1805 depressured from water wash
Action Taken
T/C 1805 depressurized and shut down.
Daily Volume (MSCF)
59
Generated 09/062017
4:06:25PM
Page 1 of 11
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITInN
1. Facility Number
0290000000
2. Facility Name
PB CCPIFFGU
3. Field
PBU - EOA
4. Operator •
BP
5. Monthlyear of Disposition
I September -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
411,201
Pool Name Pool Code Percent
7. Reinjected
184,095,831
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
33,973
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,219,392
13. Other (see instructions)
25
Official Use Only
Authorization >1 hr:
iSafety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
189,760,422
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FSI
189,760,422
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,779 mscf; Block
18: Fuel Gas to LPC = 25 mscf
I hereby certify that a foregoing is true and correct to the best of my knowledge.
Nate: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure Of 14.65 Asia and to a
Printed Name Diane Colley y� / temperature of 60o F. Authority 20
Phone (907) 564-5775 Date �(l AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
September 2017
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
junplanned events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
0
See attachments
0
TOTAL
0
0
0
0
33,973
0
33,973
See attachments
See attachments
Page 1
10/12/2017
2:33 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRnnl IrPn r_AQ nICOneiTin.i
1.
-
Facility Number 2. Facility Name
-- ---------
3. Field
.....,. twt.
0290000000 PBU CCP/FFGU
PBU - EOA
4. Operator 5. Monmtyear of Disposition
BP I
Disposition
Volume MCF
October -2017
20. For production from multiple pools, list contribution of each pool as a percent of
6.
Sold
450,467
Total Volume.
Pool Name Pool Code Percent
7.
Reinjected
201 898180
PRUDHOE 640150 100.00%
8.
Flared or vented 1 hour or less
1,972
9.
Flared or vented more than 1 hour (see Irish.)
0
10.
Pilot and Purge
35,093
11.
Assist Gas
0
12.
Fuel gas used in lease operations.
5,580,072
13.
Other (see instructions)
Offcial Use Only
Authorization > 1 hr MCF
74.
TOTAL VOLUME (ITEMS 8-12)
207,965,784
Safety
15.
NGL Gas Equivalent
Lease Use MCF
0
16.
Purchased gas
Conservation MCF
0
Waste: MCF
17.
Transferred from: CGF 8 FS1
207,965,784
18.
Transferred to: (Express as a negative #)
U
Commissioner Date
19.
Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU;
Block 12: Includes COTP Non-PBU Fuel Gas = 1,495 mscf; Block
18: Fuel Gas to LPC = 0 mscf
I hereby certiry that the foregoing is true and correct to the best of my knowledge.
Signature �� WEf/.�i�Note:
All volumes must be corrected
Title Manager Production Taxes and Roaloes Alaska to pressure of 14.65 psla and to a
Printed Name Diane Colleyy
Phone (907) 564-5775
temperature of 60o F. Authority 20
l
Date / AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
October 2017
Unplanned events less than or equal to 1 hour
2027-2032
DATE
TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/20/2017
2342-2347
77 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
10/21/2017
0917-0922
8
10/21/2017
1742-1747
156
10/22/2017
1539-1544
8
10/22/2017
2229-2234
8
10/22/2017
2300-2305
8
10/23/2017
0025-0030
14
TOTAL
279
TIME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
events less than or equal to 1
IIIA bio
10/19/2017
2027-2032
135 See attachments
10/19/2017
2232-2237
8
10/20/2017
0112-0117
156
10/20/2017
0335-0340
8
10/20/2017
1612-1617
135
10/20/2017
1808-1812
8
10/21/2017
0116-0121
156
10/21/2017
0340-0345
8
10/21/2017
0845-0850
135
10/21/2017
1042-1047
8
10/21/2017
1407-1412
8
10/21/2017
2343-2348
135
10/22/2017
0149-0154
8
10/22/2017
1528-1533
8
10/23/2017
0251-0256
135
10/23/2017
0452-0457
8
10/23/2017
1459-1504
8
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
CAUSE
Page 1
11/13/2017
9:27 AM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
October 2017
10/23/2017
1813-1818
135
10/23/2017
2117-2122
8
10/24/2017
0203-0208
8
10/24/2017
0522-0527
135
10/24/2017
0731-0736
14
10/24/2017
2125-2130
8
10/24/2017
2326-2331
135
10/25/2017
0421-0426
156
10/25/2017
0615-0620
8
10/25/2017
1530-1535
11
10/25/2017
2000-2005
8
TOTAL
1,693
1tI&IA
See attachments
TOTAL 0
CAUSE
See attachments
Page 2
11/13/2017
9:27 AM
TOTAL
Unplanned Events < 1 Hour
279
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
1,693
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
35,093
Assist
0
TOTAL FLARED VOLUME
37,065
CAUSE
See attachments
Page 2
11/13/2017
9:27 AM
Flare Start Date 10/01/2017
Flare End Date 1013112017
CCP Flare Report Total Volume (MSCF) 1972
Report
Numbs System Date Start Time Stop Time Duration
Intermittent Black Smoke Planned Reported By Volume
17-397 Controlled Slowdown 10/19/2017 8:27:00 pm 8:32:00 pm 5 min
No No Yes BPMASSIETS 135
Determination Cause T/C 1808 de -pressured for water wash
Action Taken T/C 1808 de -pressurization completed
17-397 Controlled Blowdown 10/19/2017 10:32:00 pm 10:37:00 pm 5 min
No No Yes BP1\MASSIETS 8
Determination Cause TIC 1808 de -pressured from spin cool for water wash
Action Taken T/C 1808 de -pressurization completed
Daily Volume (MSCF) 143
17-401 Controlled Blowdown 10/20/2017 1:12:00 am 1:17:00 am 5min
No No Yes BPIRMASSIETS 156
Determination Cause T/C 1809 de -pressured forwater wash
Action Taken T/C 1809 de -pressurization completed.
17-401 Controlled Blowdown 10/20/2017 3:35:00 am 3:40:00 am 5 min
No No Yes BPIWASSIETS 8
Determination Cause TIC 1809 tle-pressured from spin cool for water wash
Action Taken T/C 1809 de -pressurization completed.
17-401 Controlled Blowdown 10/20/2017 4:12:00 pm 4:17:00 pm 5 min
No No Yes BP1\KOSMBO 135
Determination Cause TRC 1805 spin cooling
Action Taken 1805 TIC depressurization completed.
17-401 Controlled Blowdown 10/20/2017 6:08:00 pm 6:12:00 pm 4 min
No No Yes BP1\KOSMBO 8
Determination Cause TRC 1805 spin Cooling
Action Taken 1805 T/C depressurized and shut down.
17-405 Controlled Blowdown 10/21/2017 1:16:00 am 1:21:00 am 5 min
No No Yes 8P1\MASSIETS 156
Determination Cause T/C 1812 shut down for Spin Cooling
Action Taken T/C 1812 de -pressurization completed
17405 Controlled Blowdown 10/21/2017 3:40:00 am 3:45:00 am 5 min
No No Yes BP1\MASSIETS 8
Determination Cause T/C 1812 de -pressured from spin cool
Action Taken TIC 1812 de -pressurization completed
17405 Controlled Blowdown 10/21/2017 8:45:00 am 8:50:00 am 5 min
No No Yes BP1\KOSMBO 135
Determination Cause T\C 1802 depressured for water wash
Action Taken 1802 T/C depressurized and shut down.
17-405 Controlled Blowdown 10/21/2017 10:42:00 am 10:47:00 am 5 min
No No Yes BP1\KOSMBO 8
Determination Cause TRC 1802 spin cooling
Action Taken 1802 T/C depressunzed and shut down.
17405 Controlled Blowdown 10/21/2017 2:07:00 pm 2:12:00 pm 5 min
No No Yes BP1\KOSMBO 8
Determination Cause TC 1812 spin cooling
Generated 11/03/2017 1:17:48PM
Page 1 of 8
Flare Start Date 10/01/2017
5 min
No
Flare End Date 10/31/2017
Yes
BPI MASSIETS
Action Taken 1812 TIC depressurization completed.
Determination Cause TIC 1807 de -pressured for spin cooling/Water wash
17405 Controlled Blowdown 10/21/2017 11:43:00 pm 11:48:00 pm 5 min No
No Yes BP1\MASSIETS
135
Determination Cause TIC 1803 de -pressured for water wash
Action Taken T/C 1803 de -pressurization completed
17-409 Controlled Blowdown 10/23/2017 4:52:00 am 4:57:00 am
5 min
Daily Volume (MSCF)
614
17-406 Controlled Blowdown 10/22/2017 1:49:00 am 1:54:00 am 5 min No
No Yes BP1\MASSIETS
8
Determination Cause T/C 1803 de -pressured from spin cool
Action Taken T/C 1803 de -pressurization complete
17-406 Controlled Blowdown 10/22/2017 3:28:00 pm 3:33:00 pm 5 min No
No Yes BPI\KOSMBO
8
Determination Cause TC 1805depressured after water wash
Action Taken 1805 T/C depressurization completed.
17-409 Controlled Blowdown 10/23/2017 2:51:00 am 2:56:00 am
5 min
No
No
Yes
BPI MASSIETS
135
Determination Cause TIC 1807 de -pressured for spin cooling/Water wash
Action Taken TIC 1807 de -pressurization completed
17-409 Controlled Blowdown 10/23/2017 4:52:00 am 4:57:00 am
5 min
No
No
Yes
BP1\MASSIETS
8
Determination Cause T/C 1807 De -pressured from Spin cool
Action Taken TIC 1807 de -pressurization Complete
17-409 Controlled Blowdown 10/23/2017 2:59:00 pm 3:04:00 pm
5 min
No
No
Yes
BP1XMASSIETS
8
Determination Cause T/C 1807 de -pressured from water wash
Action Taken T/C 1807 de-pressunzation compelled
17-409 Controlled Blowdown 10/23/2017 6:13:00 pm 6:18:00 pm
5 min
No
No
Yes
BP1\MASSIETS
135
Determination Cause TIC 1813 tle-pressure for water wash
Action Taken T/C 1813 de -pressurization completed
17-409 Controlled Blowdown 10/23/2017 9:17:00 pm 9:22:00 pm
5 min
No
No
Yes
BPlWASSIETS
8
Determination Cause T/C 1813 de -pressured from spin Cool
Action Taken T/C 1813 de -pressurization completed
Daily Volume (MSCF)
308
Generated 11/03/2017 1:17.48PM Page 2 of 8
Flare Start Date 10/01/2017
Flare End Date 10/3112017
17-411 Controlled Blowdown 10/24/2017 2:03:00 am 2:08:00 am
5 min No
No
Yes
MWASSIETS
8
Determination Cause TIC 1813 de -pressured from water wash
Action Taken T/C 1813 de -pressurization completed
17-411 Controlled Blowdown 10/24/2017 5:22:00 am 5:27:00 am
5 min No
No
Yes
BP11MASSIETS
135
Determination Cause T/C 1813 de -pressure for water wash
Action Taken T/C 1813 de -pressurization completed.
17-411 Controlled Blowdown 10/24/2017 7:31:00 am 7:36:00 am
5 min No
No
Yes
BPI\KOSMBO
14
Determination Cause TIC 1808 spin cooling
Action Taken 1806 TIC depressurized and shut down.
17-411 Controlled Slowdown 10/24/2017 9:25:00 pm 9:30:00 pm
5 min No
No
Yes
SP1WASSIETS
8
Determination Cause TIC 1806 de -pressured from water wash
Action Taken TIC 1806 de -pressurization completed
17AIl Controlled Slowdown 10/24/2017 11:26:00 pm 11:31:00 pm
5 min No
No
Yes
BP1\MASSIETS
135
Determination Cause T/C 1804 de -pressured for water wash
Action Taken TIC 1804 De -pressurization completed
Daily Volume (MSCF)
300
17-412 Controlled Blowdown 10/25/2017 4:21:00 am 4:26:00 am
5 min No
No
Yes
BPIIMASSIETS
156
Determination Cause T/C 1811 de -pressured for water wash
Action Taken T/C 1811 de -pressurization completed
17-412 Controlled Blowdown 10/25/2017 6:15:00 am 6:20:00 am
5 min No
No
Yes
BP7\CLEMENC
8
Determination Cause TC 1811 spin cooling
Action Taken TIC 1811 stop from spin cooling.
17-412 Controlled Slowdown 10/25/2017 3:30:00 pm 3:35:00 pm
5 min No
No
Yes
BPI\GAMBHO
11
Determination Cause TIC 1811 shut down from water wash and de -pressured to 0 psi.
Action Taken TIC 1811 de -pressurization complete.
17-412 Controlled Blowdown 10/25/2017 8:00:00 pm 8:05:00 pm
5 min No
No
Yes
BP1\STEPT2
6
Determination Cause -RC 1804 given STOP to blow down for Water wash
prep
Action Taken 1804 T/C depressurization completed.
Daily Volume (MSCF)
183
Total
Volume (MSCF)
1972
Generated 11/03/2017 1:17:48PM Page 3of8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRII illi r:ec nicDnc1"r1ril
1. Facility Number2. Facility Name
0290000000 PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP November -2017
20. For production from multiple pools, list contribution o7 each pool as a percent of
Total Volume.
6. Sold
601,478
Pool Name Pool Code Percent
T Reinjected
200,167,138
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
ILII
9. Flared or vented more than 1 hour (see instr.)
O
10. Pilot and Purge
33,982
11, Assist Gas
0
12. Fuel gas used in lease operations.
5,691,482
13. Other (see instructions)
0
Official Use Only
Authorization hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
206,494,229
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FSI
206,494,229
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 4,509 mscf; Block
18: Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�1u VLY�Y Li Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
,l temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / I Y AAC25.235,
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
November 2017
•••••� wwrv¢ ueSLKIV I IUN OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
TOTAL 0
Not required for unplanned events <= 1 hr
DATE TIME
11/20/2017
TOTAL
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
1508-1513
135
See attachments
See attachments
11/20/2017 1727-1732
14
Planned Events > 1 hour or
0
TOTAL
149
Pilot Purge
33,982
Planned events less than or equal to 1 hour
0
TOTAL FLARED VOLUME
34,131
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Page 1
12/13/2017
9:07 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
149
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
33,982
Assist
0
TOTAL FLARED VOLUME
34,131
Page 1
12/13/2017
9:07 AM
Flare Start Date 11/01/2017
Flare End Date 11/30/2017
CCP Flare Report
Total Volume (MSCF)
149
Report
Numbs System Date Start Time Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
17-431 Controlled Blowdown 11/20/2017 3:08:00 pm 3:13:00 pm 5 min No
No Yes BP1\KOSMBO
135
Determination Cause T\C 1801 shutdown for planned maintenance
Action Taken 1801 TIC depressurized and shut down.
17-431 Controlled Blowdown 11/20/2017 5:27:00 pm 5:32:00 pm 5 min No
No Yes BPI\KOSMBO
14
Determination Cause -RC 1801 spin cooling
Action Taken 1801 T/C depressurized complete
Daily Volume (MSCF)
149
Total Volume (MSCF)
149
Generated 12/06/2017 9.22:30AM Page 1 of 6
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROn1ICFn roc n1QPnQ1Tinr t
- - -'-- --
1. Facility Number 2. Facility Name
0290000000 PBU CCP/FFGU
Disposition
---------
3. Field
PBU - EOA
Volume MCF
v..v v.V. VW' ..V1\
4. Operator 5. MonthNear of Disposition
BP December -2017
20. For production from multiple pools, list contabution of each pool as a percent of
Total Volume.
6. Sold
609,101
Pool Name Pool Code Percent
7. Reinjected
210,637,501
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
764
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
35,085
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,812,520
13. Other (see instructions)
0
Official Use Only
Authorization >1 he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
217,094,971
lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
217,094,971
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 623 mscf; Block 18:
Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�Jllc lA Note: All volumes must be corrected
Signature Title Manager Production Taxes and Rovalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colle Phone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING AND VENTING INCIDENT REPORT
December 2017
-
12/6/2017
•••••.
1500-1505
.a+wrvm uOCMIYIION OF INCIDENT & CAUSE
DATE
12/6/2017
TIME
8 Not required for events <= 1 hr
12/6/2017
1735-1740
8
12/7/2017
0520-0525
6
12/31/2017
0737-0742
135
12/7/2017
TOTAL
157
Not required for events <= 1 hr
TOTAL
Planned events less than or equal to 1
0
hour
See attachments See attachments
DATE
12/6/2017
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
0302-0307
51
Not required for events <= 1 hr Not required for events <= 1 hr
12/6/2017
1335-1340
8
12/7/2017
0030-0035
159
12/7/2017
0322-0327
3
12/9/2017
0745-0750
135
12/9/2017
0945-0950
14
12/10/2017
0845-0850
135
12/10/2017
1045-1050
14
12/21/2017
0336-0341
77
12/22/2017
1041-1046
11
TOTAL
607
TOTAL
0
----••••••-•-�•....�..��.�wcnwc ACTION TAKEN TO
See attachments See attachments
Page 1
1/12/2018
9:58 AM
BP EXPLORATION (ALASKA( INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING AND VENTING INCIDENT REPORT
December 2017
TOTAL
Unplanned Events < 1 Hour Y57
Unplanned Events> 1 Hour
Planned Events < 1 hour and not 607
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 35,085
Assist
TOTAL FLARED VOLUME 35,849
Page 2