Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU CGF B - BP Exploration (Alaska), Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2017
Facility: PBU CGF B
Operator: BP EXPLORATION (ALASKA) INC.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS niSpnsiTinN
1. Facility Number2.
0290000008
Facility Name
PBU CGF B
3. Field
PBU - EOA
4. Operator ... •
BP
5. Month/Year R Disposition
January -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,651,825
Pool Name Pool Code Percent
7. Reinjected
6,663,643
PRUDHOE 640150 100.00°
8. Flared or vented 1 hour or less
1,697
9. Flared or vented more than 1 hour (see instr.)
30,644
10. Pilot and Purge
25,948
11. Assist Gas
47,458
12. Fuel gas used in lease operations.
2,962,220
13. Other (see instructions)
Official Use Only
Authorization hr:
Safety
N
MCF
Z�{
14. TOTAL VOLUME (ITEMS 6-12)
11,383,435
Lease Use
MCF
15. NGL Gas Equivalent
1,651,825
Conservation
MCF
16. Purchased gas
O
Waste:
MCF
17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3
236,931,306
L 00'Y 3 -ze -
18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA
-225,547,873
Commissioner Data
19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,217,502 mscf
I hereby certify that foreping is true and correct to the best of my knowledge.
%� C�1 Note: All volumes must be corrected
Signature_ Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
// / _ temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date (n AAC25.235.
q -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
January 2017
[unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/1/2017 0915-0930 400 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
1/2/2017 2107-2119 195
1/22/2017 1159-1209 387
TOTAL 982
1/22/2017
1159-1458 30,316 See attachments
TOTAL 30,316
See attachments
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/25/2017 2044-2105 328 See attachments See attachments
1/27/2017 0806-0809 387
TOTAL 715
1/26/2017
1650-1812
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
328 See attachments
328
TOTAL
982
30,316
715
328
25,948
47,458
105,747
See attachments
Page 2
2/12/2017
5:13 PM
Flare Start Date 01/01/2017
Flare End Date 01/31/2017
Total Volume (MSCF) 32341
Generated 02/02/2017 11:09:42AM Page 2 of 8
CGF Flare Report
Total Volume (MSCF)
32341
Report
Numbe System
Date Start Time Stop Time Duration Intermittent
Black Smoke
Planned Reported By
Volume
17-28 Flare Relief 01/22/2017 11:59:00 am 2:58:00 pm 179 min No
No
No BP1\OKINELKJ
30316
Determination Cause
'RC 1805 shutdown due to Hi -Hi seal oil supply temp.
Action Taken
T\C 1805 was restarted at 14:13 hours. Loaded MI -1 and flare valve dosed at
14:58.
17-32 Flare Relief 01/25/2017 8:44:00 pm 9:05:00 pm 21 min No
No
Yes BPi\BOLDJT
328
Determination Cause
T/C Shutdown from IDLE after verifying that it would start and run after fuel gas
system repairs
Action Taken
1855 T/C depressurization completed
Daily Volume (MSCF)
328
17-34 Flare Relief 01/26/2017 4:50:00 pm 6:12:00 pm 82 min No
No
Yes BPI SPRAGJ
328
Determination Cause
1855 Starter troubleshooting and maintenance repair
Action Taken
Instrumentation repaired and equipment returned to service
Daily Volume (MSCF)
328
17-35 Flare Relief 01127/2017 80600 am 8:09:00 am 3 min No
No
Yes BP1\SPRAGJ
387
Determination Cause
T\C 1855 shutdown for planned maintenance--BESD 1855 Train
Action Taken
Flare valve closed
Daily Volume (MSCF)
367
Total Volume (MSCF) 32341
Generated 02/02/2017 11:09:42AM Page 2 of 8
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, February 07, 2017 7:39 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Schinagl, Werner
Subject: Flaring events at CGF
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc.reporting (d)alaska.gov victoria.loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 01/22/2017 11:59 and stopping at 01/22/2017 14:58 with a volume of 30316
(MSCF). The event lasted for 179 minutes and was due to tandem compressor (T/C) 1805 shutting down from a Hi -Hi
seal supply temperature. The event stopped when the T/C was restarted.
A flaring event occurred at CGF starting at 01/26/2017 16:50 and stopping at 01/26/2017 18:12 with a volume of 328
(MSCF). The event lasted for 82 minutes and was due to troubleshooting compressor 1855's starter. The event stopped
when maintenance repaired the equipment and 1855 was returned to service.
Thanks,
Jennifer Bloke
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRr)nurFn r:ec niccnerrinki
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Vrt_
41411 --
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
February 2017
2/11/2017
1620-1635
328 Not required for unplanned events <= 1 hr
2/13/2017
2017-2032
328
2/13/2017
2232-2330
11,042
2/16/2017
0524-0539
387
2/16/2017
1338-1352
387
2/16/2017
1343-1358
387
2/16/2017
2138-2155
387
2/16/2017
2201-2218
387
TOTAL
13,633
events greater than
2/11/2017
1635-1846
19,336 See attachments
2/16/2017
0524-0648
12,181
2/16/2017
1343-1532
16,868
2/16/2017
2139-2302
14,335
2/24/2017
TOTAL
62,720
events less than or equal to 1 hour
2/8/2017
1615-1630
328 See attachments
2/10/2017
0200-0215
328
2/18/2017
0301-0314
387
2/22/2017
1054-1109
328
2/24/2017
1715-1727
8,000
TOTAL
9,371
Not required for unplanned events <=1 hr
See attachments
ACTION TAKEN TO E
See attachments
Page 3
3/15/2017
10:10 AM
2/10/2017 0215-0400
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
February 2017
21,499 See attachments
21,499
TOTAL
13,633
62,720
9,371 ��1ZIa
21,499
23,474
44,958
175,655
See attachments
Page 4
3/15/2017
10:10 AM
Flare Start Date 02/01/2017
Flare End Date 02/28/2017
CGF Flare Report Total Volume (MSCF) 107223
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-42 Controlled Blowdown 02/08/2017 4:15:00 pm 4:30:00 pm 15 min No
Determination Cause -RC 1805 shutdown for planned maintenance
Action Taken 1805 TIC depressurization to 180 psig.
No Yes BPIISPRAGJ
328
Daily Volume (MSCF)
328
17-44 Flare Relief 02/10/2017 2:00:00 am 2:15:00 am 15 min Yes
No Yes BPlZPRAGJ
328
Determination Cause TC 1855 unplanned shutdown during planned maintenance
Action Taken 1855 TIC depressurization to 180 psig.
1744 Flare Relief 02/10/2017 2:15:00 am 4:00:00 am 105 min Yes
No Yes BP1\SPRAGJ
21499
Determination Cause nC 1855 unplanned shutdown during planned maintenance
Action Taken Equipment was restarted at 04:00 hours.
Daily Volume (MSCF) 21827
17-46 Flare Relief 02/11/2017 4:35:00 pm 6:46:00 pm 131 min Yes No No BPIISPRAGJ 19336
Determination Cause Extended Flaring event occurred while awaiting operator/maintenance evaluation and restart
Action Taken Repaired equipment malfunction, restarted 1855 T/C, and returned facility to normal operation.
17-51 Flare Relief 02/16/2017 5:24:00 am 6:48:00 am 84 min No No No BP"BOLDJT 12181
Determination Cause TIC 1855 shutdown due to controNnstrumentation Failure associated with Seal DP or GCV, really we don't know yet.
Action Taken Equipment was restarted
17-51 Flare Relief 02/16/2017 1:43:00 pm 3:32:00 pm 109 min No
Determination Cause TIC 1855 shutdown due to controNnstrumentation failure
Action Taken Equipment was restarted
Generated 03/01/2017 3:11:04PM
No No BPIIBOLDJT 16868
Page 3 of 9
Flare StartDate 02/01/2017
Flare End Date 02/28/2017
17-51 Flare Relief 02/16/2017 9:39:00 pm 11:02:00 pm 83 min Yes No No BP11VINZANRA 14335
Determination Cause T\C 1855 shutdown due to controNnstwmentation failure associated with seal oil.
Action Taken Equipment malfunction Geared, restarted 1855 TIC, and returned facility to normal operation.
17-55 Flare Relief 02/18/2017 3:01:00 am 3:14:00 am 13 min Yes
Determination Cause T\C 1855 shutdown for planned maintenance
Action Taken 1855 T/C depressurization completed.
17-59 Flare Relief 02/22/2017 10:54:00 am 11:09:00 am 15 min No
Determination Cause IAC 1855 shutdown after verifying Gas Control Valve repairs.
Action Taken 1855 TIC depressurized and shut down.
17-61 Flare Relief 02/24/2017 5:15:00 pm 5:27:00 pm 12 min No
Determination Cause 01 F203AV residue gas used to verify Flare pilot integrity
Action Taken Closed valve
No Yes BP1\VINZANRA 387
Daily Volume (MSCF) 387
No Yes BP1\80LDJT 328
No
Daily Volume (MSCF) 328
Daily Volume (MSCF) 8000
Total Volume (MSCF) 107223
Generated 03/01/2017 3:11:04PM Page 4 of 9
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, February 24, 2017 10:52 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Schinagl, Werner
Subject: Flaring events at CGF
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc.reporting(d)alaska.gov victoria.loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 02/10/2017 02:15 and stopping at 02/10/2017 04:00 with a volume of 21499
(MSCF). The event lasted for 105 minutes and was due to tandem compressor (T/C) 1855 shutting down during planned
maintenance. The event stopped when the T/C was restarted.
A flaring event occurred at CGF starting at 02/11/2017 16:35 and stopping at 02/11/2017 18:46 with a volume of 19336
(MSCF). The event was intermittent and lasted for 131 minutes. The event was due to T/C 1855 shutting down caused by
a control / instrumentation failure associated with seal oil DP transmitters. The event stopped when maintenance repaired
the equipment malfunction and 1855 was returned to service.
A flaring event occurred at CGF starting at 02/13/2017 22:32 and stopping at 02/13/2017 23:30 with a volume of 11042
(MSCF). The event was intermittent and had a volume greater than 5000 (MSCF). The event was due to T/C 1855
shutting down for unknown reasons. The event stopped when 1855 was restarted.
A flaring event occurred at CGF starting at 02/16/2017 05:24 and stopping at 02/16/2017 06:48 with a volume of 12181
(MSCF). The event lasted for 84 minutes and was due to T/C 1855 shutting down due to unknown reasons. The event
stopped when 1855 was restarted.
A flaring event occurred at CGF starting at 02/16/2017 13:43 and stopping at 02/16/2017 15:32 with a volume of 16868
(MSCF). The event lasted for 109 minutes and was due to T/C 1855 shutting down due to unknown reasons. The event
stopped when 1855 was restarted.
A flaring event occurred at CGF starting at 02/16/2017 21:39 and stopping at 02/16/2017 23:02 with a volume of 14335
(MSCF). The event lasted for 83 minutes and was due to T/C 1855 shutting down caused by control/instrumentation
failure associated with seal oil. The event stopped when maintenance repaired the equipment malfunction and 1855 was
returned to service.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAs nispnsiTinN
1. Facility Number
0290000008
2. Facility Name
PBU CGF B
3, Field
PBU - EOA
4. Operator .. •
BP I
5. MonthNear of Disposition
March -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,6$3,032
pool Name Pool Code Percent
7, Reinjected
6,599,432
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
387
9. Flared or vented more than 1 hour (see instr.)
103,982
10. Pilot and Purge
26,272
11. Assist Gas
49,271
12. Fuel gas used in lease operations.
3,216,902
13. Other (see instructions)
Official Use Only
Authorizations hr:
Safety
rJ3
1 �Z
MCF -r
14. TOTAL VOLUME (ITEMS 6-12)
11,679,278
Lease Use
MCF
15. NGL Gas Equivalent
1,683,032
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3
241,936,012
18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA
-230,256,731
Commissioner Date
19. Remarks: Block 6: Gas equivalent of NGLs, Block 18: Includes MI Gas to Pt. McIntyre = 1,809,477 mscf
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
0�� dwa Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
March 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/14/2017 0216-0224 387 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 387
3/13-14/17 1520-1335
-------••---
103,982 See attachments
n� I ivn I Anus IU[LIMINA It CAUSE
See attachments
TOTAL
103,982
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT& CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
387
Unplanned Events> 1 Hour
103,982
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
26,272
Assist
49,271
TOTAL FLARED VOLUME
179,912
Page 3
4/13/2017
10:32 AM
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, March 16, 2017 3:16 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Schinagl, Werner
Subject: Flaring events at CGF
Follow Up Flag: Follow up
Flag Status: Flagged
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aoacc.reoorting(a)alaska.gov victoria.loeoo(a),alaska.00v
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 03/13/2017 15:20 and continuing into 03/14/2017 with a volume of 11625
(MSCF) on 3/13/17. The event lasted for 520 minutes on 3/13/17 and was due to an extended flaring event while bringing
the plant back online after both refrigeration compressors shutdown. The event continued into the next day.
A flaring event occurred at CGF, continuing from the previous day, stopping at 03/14/2017 13:35 with a volume of 92357
(MSCF) on 3/14/17. The event lasted for 815 minutes on 3.14/17 and was due an extended flaring event while bringing
the plant back online after both refrigeration compressors shutdown. The event stopped when the troubleshooting of the
refrigeration compressors was completed and the compressors were reloaded.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Flare Start Date 03/01/2017
Flare End Date 03/31/2017
CGF Flare Report
Total Volume (MSCF) 104369
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
11 dtl Flare Relief 03/13/2017 3:20:00 pm 12:00:00 am 520 min Yes No No BP1\GONDEO 11625
Determination Cause Extended flaring event occurred while bringing plant backup after both refrigeration compressors SID (1806/1856).
Action Taken Refrigeration compressor 1856 started back up and process brought back online and stabilized. This occurred on the next shift. See flare
- — YBPon#3F74/2647 fordetails....
Daily Volume (MSCF) 11625
17-89 Flare Relief 03/14/2017 12:00:00 am 1:35:00 pm 815 min Yes No No BP1\GONOEO 92357
Determination Cause Extended flaring event occurred while bringing plant backup after both refrigeretion compressors SID (1806/1866). Flaring duration was
increased due to loss of MI compressor 1805 during the upset. 1805 would not start back up right away due to instrumentation issues.
Backup MI was unavailable. SO for maintenance.
Action Taken Completed troubleshooting, reloaded 1806/1856/1805 T/C's, and stabilized facility process and operation.
Total Volume (MSCF) 104369
Generated 04/03/2017 4:36:08PM Page 3 of 7
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAR DiRpnRiTinN
1. Facility Number2. Facility Name
0290000008 PBU CGF B
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator • 5. MonthNear of Disposition
BP April -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume .
s. sold
1,650,533
Pool Name Pool Code Percent
7. Reinjected
6,304,622
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,247
9. Flared or vented more than 1 hour (see instr.)
860
10. Pilot and Purge
25,563
11. Assist Gas
45,266
12. Fuel gas used in lease operations.
2877,397
13. Other (see instructions)
0
Official Use Only
Authorization he
Safety
/
14. TOTAL VOLUME (ITEMS 6-12)
10,905,488Lease
Use15.
AMCF
NGL Gas Equivalent
1,650,533
Conservation16.
Purchased gas
UWaste:
17. Transferred from: FS1, FS2, FS3, GC1, GC2 8 GC3
224,169,775
Commissioner Date
18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP 8 GPMA
-213,264,285
19. Remarks Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,809,110 mscf
I hereby certify met the
�ttt�hhe foregoing �issttrue and correct to the best of my knowledge.
Signature Csfl%hr (Ch1lC�� Note: All volumes must be corrected
Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
Printed Name Diane Colleytemperature of 60o F. Authority 20
Phone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2017
unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/10/2017 1052-1110 430 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 430
Unplanned events areaterthan 1 hour
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/26/2017 0100-0130 430 See attachments See attachments
4/26/2017 2200-2230 387
TOTAL 817
4/11/2017 0145-0335
4/11/2017 1910-2200
TOTAL
430 See attachments
See attachments
Page 3
5/14/2017
2:06 PM
TOTAL
Unplanned Events < 1 Hour
430
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
817
exceeding 5,000 MCF
Planned Events> 1 hour or
860
exceeding 5,000 MCF
Pilot Purge
25,563
Assist
45,266
TOTAL FLARED VOLUME
72,936
See attachments
Page 3
5/14/2017
2:06 PM
Flare Start Date 04/01/2017
Flare End Date 04/30/2017
CGF Flare Report
Total Volume IMSCFI 21n7
Report
Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-111 Controlled Blowdown 04/11/2017 1:45:00 am 3:35:00 am 110 min No No
Determination Cause TC 1883 depressured for water wash. Extended duration due to time for spin cooling.
Action Taken 1883 T/C depressurized and shut down.
Yes BPI\GONDEO 430
17-771 Flare Relief 04/11/2017 7:10:00 pm 10:00:00 pm 170 min No No
Yes BP1lGONDEO
430
Determination Cause TC 1886 depressured for watarwash. Extended duration due to time for spin cooling.
Action Taken 1886 T/C depressurized and shut down.
Daily Volume (MSCF)
860
17-135 Flare Relief 04/26/2017 1:00:00 am 1:30:00 am 30 min No No
Yes BPt\CHRIDP
430
Determination Cause Shutdown Tandem compressor 1885 for planned maintenance.
Action Taken Depressurize to 0 psig.
17-135 Flare Relief 04/26/2017 10:00:00 pm 10:30:00 pm 30 min No No
Yes BP7\CHRIDP
387
Determination Cause Shutdown and depressured 1855 to 0 psig.
Action Taken Complete depressurization
Daily Volume (MSCF) 817
Total Volume (MSCF) 2107
1:16:36PM
Page 5 of 10
Link, Liz M (DOA)
From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, May 2, 2017 5:17 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL, Buckbee,
Rachel A; Schinagl, Werner
Subject: Flaring events at CGF
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc.reportinqC@alaska.gov victoria.loepp(cilalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 04/11/2017 01:45 and stopping at 04/11/2017 03:35 with a volume of 430
(MSCF). The event lasted for 110 minutes and was due to depressurization and spin cooling of T/C 1883 for a planned
water wash. The event stopped when T/C 1883 depressurization and shutdown was completed.
A flaring event occurred at CGF starting at 04/11/2017 19:10 and stopping at 04/11/2017 22:00 with a volume of 430
(MSCF). The event lasted for 170 minutes and was due to depressurization and spin cooling of T/C 1886 for a planned
water wash. The event stopped when T/C 1886 depressurization and shutdown was completed.
Thanks,
Jennifer Bloke
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake(iabp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000008 PBU MF B
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator
p 5. MonthNear of Disposition
BP May -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,634,478
Pool Name Pool Code Percent
7. Reinjected
6,152,710
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
2,591
9. Flared or vented more than 1 hour (see instr.)
85,805
10. Pilot and Purge
25,716
11. Assist Gas
51,740
12. Fuel gas used in lease operations.
2,882,574
13. Other (see instructions)
0
Official Use Only
[Authorization>7 hr:Safety
(u' Sr�Q�
MCF VT(^14.
TOTAL VOLUME (ITEMS 6-12)
10,835,614
Use
MC
fLease
15. NGL Gas Equivalent
1,634,478
1fi. Purchased gas
0Conservation
MCF
MCF
17. Transferred from: FS1, FS2, FS3, GC1, GC2 8 GC3
226,069,011
18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP 6 GPMA
-215,233,396
Commissioner Date
19. Remarks: Block 6: Gas equivalent of NGLs, Block 18: Includes MI Gas to Pt. McIntyre = 1,678,062 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature_ ��)�
�(g�G) Note: All volumes must be corrected
Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colle j - temperature of 60o F. Authority 20
Phone (907) 564-5775 Date �) AAC25.235.
I -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT Page 1
May 2017
unplanned events less than or equal to 1 hour
TOTAL
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/9/2017 0810-0825
387 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
5/9/2017 0853-0900
328
Planned Events> 1 hour or
5/9/2017 0901-0908
328
5/9/2017 0915-0923
387
Assist
5/12/2017 1723-1744
387
165,852
5/28/2017 1025-1049
387
5/28/2017 2010-2040
387
TOTAL
2,591
Unplanned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/9/2017 0810-1045
23,963 See attachments
See attachments
5/28/2017 1027-1208
15,424
5/28-29/17 2007-0047
46,418
TOTAL
85,805
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
6/18/2017
4:00 PM
TOTAL
Unplanned Events < 1 Hour
2,591
Unplanned Events> 1 Hour
85,805
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
25,716
Assist
51,740
TOTAL FLARED VOLUME
165,852
6/18/2017
4:00 PM
Flare Start Date 05101/2017
Flare End Date 0513112017
CGF Flare Report Total Volume (MSCF) 88396
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-153 Flare Relief 05/09/2017 8:10:00 am 10:45:00 am 155 min No No No BP1\BOLDJT 23963
Determination Cause TC 1805 shutdown due to a problem associated with Unknown, possible issues with Seal oil low dp. Meter 660 total after P431 valves
closed
Action Taken Started off-line TIC, and stabilized facility process and operation
17-184 Flare Relief 05/28/2017 10:27:00 am 12:08:00 pm 101 min No No No BP1\BOLDJT 15424
Determination Cause T\C 1855 shutdown due to controNnstrumentation failure associated with unknown. Meter 664 Flare report for stab overhead pressure
control while machine was shut down
Action Taken Started 1855 TIC, and stabilized facility process and operation
17-184 Flare Relief 05/28/2017 6:07:00 pm 11:59:00 pm 232 min No No No BP1\BOLDJT 40298
Determination Cause T\C 1855 shutdown due to a problem associated with ground fault. Report is for meter 664 for stabilizeroverhead pressure control while the
machine was down. Flaring continued until the next day, see report for 5/29.
Action Taken Flaring continued until 5/29
17-203 Flare Relief 05/29/2017 12:00:00 am 12:47:00 am 47 min No No No BPI\BOLDJT 6120
Determination Cause T\C 1855 shutdown due to a problem associated with ground fault. Entry is for meter 664, conclusion of flaring from 5/28
Action Taken Repaired equipment malfunction, restarted 1855 T/C, and returned facility to normal operation.
Total Volume (MSCF) 88396
Generated 06/09/2017 2:22:08PM Page 2 of 9
Link, Liz M (DOA)
From:
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Tuesday, May 23, 2017 11:01 AM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Dean, James A
Subject:
Flaring event at CGF
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc.reporting(a)alaska.gov victoria.loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 05/09/2017 08:10 and stopping at 05/09/2017 10:45 with a volume of 23963
(MSCF). The event lasted for 155 minutes and was due to a tandem compressor, (T/C) 1805, shutdown from an unknown
issue. This issues was suspected to be seal oil low differential pressure. The event stopped when the T/C was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: Blake, Jennifer! <Jennifer.Blake@bp.com>
Sent: Wednesday, June 14, 2017 4:55 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Dean, James A
Subject: Flaring events at CGF
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc.reporting(o)alaska.gov victoria.loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 05/28/2017 10:27 and stopping at 05/28/2017 12:08 with a volume of 15424
(MSCF). The event lasted for 101 minutes and was due to a T/C 1855 shutdown due to control/instrumentation failure.
The event stopped when T/C 1855 was restarted and the process stabilized.
A flaring event occurred at CGF starting at 05/28/2017 20:07 and stopping at 05/28/2017 23:59 with a volume of 40298
(MSCF). The event lasted for 232 minutes and was due to a T/C 1855 shutdown due to a problem associated with a
ground fault. Flaring continued into the next day, 5/29/2017.
A flaring event occurred at CGF starting at 05/29/2017 00:00 and stopping at 05/29/2017 00:47 with a volume of 6120
(MSCF) and was a continuation of the 5/28 flaring event caused by T/C 1855 ground fault. The event stopped when T/C
1885 was repaired and the compressor was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake(@bp.com
Flare Start Date 05/01/2017
Flare End Date 05/31/2017
CGF Flare Report Total Volume (MSCF) 88396
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-153 Flare Relief 05/09/2017 8:10:00 am 10:45:00 am 155 min No No No BP1\BOLDJT 23963
Determination Cause T\C 1805 shutdown due to a problem associated with Unknown, possible issues with Seal oil low dp. Meter 660 total after P431 valves
closed
Action Taken Started off-line T/C, and stabilized facility process and operation
17-184 Flare Relief 05/28/2017 10:27:00 am 12:08:00 pm 101 min No No No BP1\BOLDJT 15424
Determination Cause T\C 1855 shutdown due to controhinstrumentation failure associated with unknown. Meter 664 flare report for stab overhead pressure
control while machine was shut down
Action Taken Started 1855 TIC, and stabilized facility process and operation
17-184 Flare Relief 05/28/2017 8:07:00 pm 11:59:00 pm 232 min No No No BP1\BOLDJT 40298
Determination Cause T\C 1855 shutdown due to a problem associated with ground fault. Report is for meter 664 for stabilizer overhead pressure control while the
machine was down. Flaring continued until the next day, see report for 5/29.
Action Taken Flaring continued until 529
17-203 Flare Relief 05/29/2017 12:00:00 am 12:47:00 am 47 min No No No BP1\BOLDJT 6120
Determination Cause T\C 1855 shutdown due to a problem associated with ground fault. Entry is for meter 664, conclusion of flaring from 5/28
Action Taken Repaired equipment malfunction, restarted 1855 T/C, and returned facility to normal operation.
Total Volume (MSCF) 88396
Generated 06/09/2017 2:22:08PM Page 2 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCM rnS niSpnciTinti
1. Facility Number 2. Facility Name
0290000008 PBU CGF B
Disposition
------
3. Field
PBU - EOA
Volume MCF
- --•- ....v
4. Operator 5. MonthNear of Disposition
BP June -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,381,934
Pool Name Pool Code Percent
7. Reinjected
5,737,833
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
2,956
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
24,352
11. Assist Gas
49,762
12. Fuel gas used in lease operations.
2,537,106
13. Other (see instructions)
Official Use Only
Authorization >7 hr :
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
9,733,943
Lease Use
MCF
15, NGL Gas Equivalent
1,381,934
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: FS1, FS2, FS3, GCI, GC2 & GC3
196,828,522
Commissioner Date
18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA
-187,094,579
19. Remarks: Block 6: Gas equivalent of NGLs, Block 18: Includes MI Gas to Pt. McIntyre = 1,250,141 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�/� Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
7temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
June 2017
unplanned events less than or equal to 1 hour
0
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT& CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/24/2017 0337-0355
350
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
6/24/2017 1052-1102
430
6/9/2017 0238-0256
255
6/24/2017 1054-1130
419
387
6/24/2017 1101-1127
430
6/24/2017 1556-1612
430
Planned events greater than 1 hour
TOTAL
2,059
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Unplanned events greater than 1 hour
See attachments
See attachments
TOTAL
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Events < 1 Hour
See attachments
See attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/9/2017 0238-0256
255 See attachments
See attachments
6/9/2017 0238-0256
255
6/30/2017 1548-1618
387
TOTAL
897
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
2,059
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
897
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
24,352
Assist
49,762
TOTAL FLARED VOLUME
77,070
Page 3
7/18/2017
11:37 AM
Flare StartDate 06/0112017
Flare End Date 06/30/2017
CGF Flare Report Total Volume (MSCF) 2956
Report
Numbe
System
Date StartTime
Stop Time
Duration Intermittent Black Smoke Planned Reported By Volume
17-206
Flare Relief
06/09/2017 2:38:00 am
2:56:00 am
18 min No No Yes BP1\CRAMBL 255
Determination Cause Booster T/C 2 (1802) shutdown and BESD for water wash
Action Taken Compressor BESD complete
17-206 Flare Relief 06/09/2017 2:38:00 am 2:56:00 am 18 min No
Determination Cause Booster T/C1(1801) shutdown and BESD for waterwash
Action Taken Compressor BESD complete
17-235 Controlled Blowdown 06/30/2017 3:48:00 pm 4:18:00 pm 30 min No
Determination Cause MI 1 1805 shut down for planned maintenance
Action Taken 1805 T/C depressurized and shut down.
No Yes BPI\MKMXE5 255
No
Daily Volume (MSCF) 510
Daily Volume (MSCF) 387
Total Volume (MSCF) 2956
Generated 07/06/2017 2:44:22PM Page 3 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CGF B
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
July -2017
Disposition
Volume MCF
20. Forproduchon from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
950,008
Pool Name Pool Code Percent
7. Reinjected
4,228,327
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
15,406
9. Flared or vented more than 1 hour (see instr.)
115,459
10. Pilot and Purge
24,302
11. Assist Gas
71,811
12. Fuel gas used in lease operations.
2,021,254
13. Other (see instructions)
0
Official Use Only
Authorization -1 hr:
Safe
Safety
/ `� �j�
MCF Imo%
IFJf l
14. TOTAL VOLUME (ITEMS 6-12)
7,426,567
Lease Use
MCF
15. NGL Gas Equivalent
950,008
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3
156,009,952
Commissioner /fODate
18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA
-148,583,385
19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 501,660 rnscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska t0 pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 DateAAC25 235.
i-if7
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
July 2017
7/6/2017
1622-1642
387
Not required for unplanned events <= 1 hr
7/6/2017
1622-1642
195
7/6/2017
1622-1642
195
7/6/2017
1622-1642
430
7/6/2017
1622-1642
400
7/6/2017
1622-1642
400
7/6/2017
1631-1658
9,160
7/7/2017
1316-1336
430
7/14/2017
1633-1653
400
7/14/2017
1633-1653
400
7/14/2017
1921-1923
30
7/14/2017
1922-1942
400
7/15/2017
2037-2057
400
7/19/2017
1235-1241
33
7/21/2017
0642-0701
387
7/22/2017
2320-2400
.125
7/22/2017
2320-2335
387
7/22/2017
2330-2345
387
7/23/2017
2323-2328
430
TOTAL
14,976
(planned events greater than 1 hour
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT a CAUSE
7/6/2017
1622-2359
419
See attachments
7/6/2017
1622-2223
430
7/9-10/2017
0950-0802
81,873
7/21/2017
0642-1107
32,533
7/23/2017
0000-0600
204
TOTAL
115,459
Inned events less than or equal to 1
hour
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
7/19/2017
1115-1136
430
See attachments
TOTAL
430
Not required for unplanned events <= 1 hr
See attachments
See attachments
Page 3
8/13/2017
3:49 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
July 2017
See attachments
TOTAL
See attachments
Page 4
8/13/2017
3:49 PM
TOTAL
Unplanned Events < 1 Hour
14,976
Unplanned Events > 1 Hour
115,459
Planned Events < 1 hour and not
430
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
24,302
Assist
71,811
TOTAL FLARED VOLUME
226,978
See attachments
Page 4
8/13/2017
3:49 PM
Link, Liz M (DOA)
From:
Blake, Jennifer J <Jennifer.Blake@bp.com>
Sent:
Thursday, July 27, 2017 9:14 AM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory, AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Starck, Jennifer L; AK, OPS CCP OTL
Subject:
Flaring events at CGF and CCP
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc.reoorting a)alaska.gov victoria.loepoCa)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 07/06/2017 16:31 and stopping at 07/06/2017 16:58 with a volume of 9160
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to a CGF Plant Shutdown caused by an
electrical issue resulting in flaring while the field responded. The event stopped when the Field reduced production rates
and shut-in wells.
A flaring event occurred at CGF starting at 07/06/2017 16:22 and stopping at 07/06/2017 22:23 with a volume of 430
(MSCF). The event lasted for 361 minutes and was due to a T\C 1883 shutdown caused by a problem associated with
plant shutdown and electrical outage. The event stopped when 1883 T/C depressurization was completed.
A flaring event occurred at CGF starting at 07/06/2017 16:22 and stopping at 07/06/2017 23:59 with a volume of 419
(MSCF). The event lasted for 457 minutes and was due to Stabilizer overhead relief caused by the plant shutdown. The
event stopped when Field production was cut to lower gas production until CGF restarted.
A flaring event occurred at CGF starting at 07/09/2017 09:50 and continued into 07/10/2017 23:59 with a volume of 48960
(MSCF) for 07/09/2017. The event lasted for 849 minutes and was due to restarting the CGF plant from an unplanned
power outage — flaring from the top of the stabilizers while getting NGL on -spec for shipping. The event continued into
07/10/2017.
A flaring event occurred at CGF starting at 07/10/2017 00:00 and stopping at 07/10/2017 08:02 with a volume of 32913
(MSCF). The event lasted for 482 minutes and was a continuation of the previous day's flaring event for restarting the
CGF Plant. The event stopped when 1855 T/C was loaded and stabilized facility process and operation.
A flaring event occurred at CCP starting at 07/16/2017 05:15 and stopping at 07/16/2017 08:30 with a volume of 301
(MSCF). The event lasted for 195 minutes and was due to depressurization of the NGI injection lines for the NGI saddle
replacement project. The event stopped when depressurization was completed.
A flaring event occurred at CGF starting at 07/21/2017 06:42 and stopping at 07/21/2017 11:07 with a volume of 32533
(MSCF). The event lasted for 265 minutes and was due to a T/C 1855 shutdown caused by a control/instrumentation
failure. The event stopped when T/C 1855 was reloaded and stabilized facility process and operation.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blakeC@bo.com
FlareStartDate 07/01/2017
Flare End Date 07/31/2017
CGF Flare Report Total Volume (MSCF) 130865
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-256 Flare Relief 07/06/2017 4:22:00 pm 11:59:00 pm 457 min Yes No No BPI\BOLDJT 419
Determination Cause Stabilizer overhead relief due to plant shutdown
Action Taken Field production was cut to lower gas production until cgf restarted.
17-256 Controlled Blowdown 07/06/2017 4:22:00 pm 10:23:00 pm 361 min Yes No No BP1\BOLDJT 430
Determination Cause T\C 1883 shutdown due to a problem associated with plant shutdown and electrical outage.
Action Taken 1883 T/C depressurization completed.
17-261 Flare Relief 07/09/2017 9:50:00 am 11:59:00 pm 849 min No No No BP1\80LDJT 48960
Determination Cause Extended flaring event occurred while Starting plant from unplanned power outage. Flaring from top of stabilizers while getting NGL
on -spec for shipping
Action Taken End Of day, flaring continued to the next day
Daily Volume (MSCF) 48960
17-263 Flare Relief 07/10/2017 12:00:00 am 8:02:00 am 482 min No No No BP1\BOLDJT 32913
Determination Cause Extended flaring event occurred while awaiting MI loading/ MI wells in the field after plant shutdown. Crontinuation of flaring from
yesterday,
Action Taken Loaded 1855 T/C, and stabilized facility process and operation.
Generated 08/15/2017 1:28:23PM Page 5 of 15
Flare Start Date 07/01/2017
Flare End Date 07/31/2017
Daily Volume (MSCF) 32913
17-280 Controlled Blowdown 07/19/2017 11:15:00 am 11:36:00 am 21 min No No Yes BP1\CRAMBL 430
Determination Cause -RC 1883 unloaded, shut down and depressured to Opsi for water wash.
Action Taken depressurization complete
17-280
17-282 Flare Relief 07/21/2017 6:42:00 am 11:07:00 am 265 min No No No BPIICRAMBL 32533
Determination Cause Extended flaring event occurred while awaiting start of an MI machine. Stab overheads
Action Taken Completed troubleshooting, loaded 1805 TIC, and stabilized facility process and operation. We also heated up the LTS 1 and 2 to make
Generated 08/15/2017 1:28:23PM Page 6 of 15
Flare Start Date 07/0112017
Flare End Date 07/31/2017
17-292 Flare Relief 07/23/2017 12:00:00 am 6:00:00 am 360 min Yes No No BPIWURRIEM 204
Determination Cause Both M/I Compressors shut down before midnight. Stabilizer Overhead Gas was flared intermittently, while M/I #2 was re -Started, and
Facility Process was stabilized.
Action Taken M/I Compressor was re -started and the Stabilizer Process was stabilized.
Total Volume (MSCF) 130865
Generated 08/15/2017 1:28:23PM Page 7 of 15
Link, Liz M (DOA)
From: Blake, Jennifer 1 <Jennifer.Blake@bp.com>
Sent: Friday, August 25, 2017 3:44 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Starck, Jennifer L
Subject: Flaring events at CGF
Follow Up Flag: Follow up
Flag Status: Flagged
To AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc.reporting Cc alaska.gov victoria.loeppnaalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 07/23/2017 00:00 and stopping at 07/23/2017 06:00 with a volume of 204
(MSCF). The event lasted for 360 minutes and was due to both M/I Compressors shutting down. The event stopped when
M/I #2 was re -started and Facility Process was stabilized.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY RFPnRT AF PRnni irGn r --A42 nUconclrina
1.
Facility Number 2. Facility Name
3. Field
0290000008 PBU CGF B
PBU - EOA
4. Operator 5. Month/Year of Disposition
BP
Disposition
volume MCF
Auoust-9017
20. Forproduction from multiple pools, list contribution of each pool as a percent of
6.
Sold
1,080,980
Total Volume,
Pool Name Pool Code Percent
7.
Reinjected
3,725,741
PRUDHOE 640150 100.00%
8.
Flared or vented 1 hour or less
3,953
9.
Flared or vented more than 1 hour (see instr.)
4,011
10.
Pilot and Purge
24,489
11,
Assist Gas
63,578
12.
Fuel gas used in lease operations.
2,280,671
13.
Other (see instructions)
0
Official Use Only
Safetytc �
^D /I
14,
TOTAL VOLUME (ITEMS 6-12)
7,183,423
i
1
15.
NGL Gas Equivalent
1,080,980nservation
:Authorj:zation>1r:
Use MCF
16.
Purchased gas0
MCF
Waste: MCF
17.
Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3
164,802,964
n
_
18.
Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA
-157,619,541
Commissioner Date
19.
Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,336,502 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes
Signature
must be corrected
Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
Printed
Name Diane Colley�7
temperature of 60o F. Authority 20
Phone (907) 584-5775
Date
/):7 -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
August 2017
junplanneo events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/9/2017 1327-1342 255 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
8/9/2017 1915-1931 195
8/20/2017 0402-0412 400
TOTAL 850
8/26/2017
8/1/2017
8/10/2017
8/26/2017
DATE
TIME
0930-1400
TOTAL
TIME
2313-2323
0020-0100
0032-0042
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
VOLUME DESCRIPTION OF IN
4,011 See attachments
4,011
7E DESCRIPTION OF IN
400 See attachments
2,660
43
3,103
See attachments
0
TOTAL
850
4,011
3,103
0
24,489
63,578
96,031
CAUSE
ACTION TAKEN TO E
See attachments
ACTION TAKEN TO I
See attachments
ACTION TAKEN TO ELIMINATE
See attachments
Page 2
9/14/2017
4:31 PM
Flare Start Date 08/01/2017
Flare End Date 08/31/2017
CGF Flare Report Total Volume (MSCF) 7964
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-306 Flare Relief 08/01/2017 11:13:00 pm 11:23:00 pm 10 min No No Yes BP1\OKINELKJ 400
Determination Cause S/D 1886 to reset MKIV control logic
Action Taken 1886 de -pressured to 40 psig. Completed de -pressurisation.
Daily Volume (MSCF) 400
17-319 Controlled Blowdown 08/10/2017 12:20:00 am 1:00.00 am 40 min No No Yes BPI\BOLDJT 2660
Determination Cause LTS-1 BESD in preparation for 36" Chiller Valve repair and T7AV/BV packing repair.
Action Taken BESD complete
Daily Volume (MSCF) 2660
17-344 Controlled Blowdown 08/26/2017 12:32:00 am 12:42:00 am 10 min No No Yes BPI\OKINELKJ 43
Determination Cause TIC 1856 shutdown for planned maintenance.
Action Taken 1856 T/C depressurized and shut down.
17-344 Flare Relief 08/26/2017 9:30:00 am 2:00:00 pm 270 min Yes No No BPI\GONDEO 4011
Determination Cause T\C 1806 shutdown due to controhinstrumentation failure associated with exhaustthennocouples causing process upset in the plant due
to both refrigeration machines being shutdown.
Action Taken Repaired equipment malfunction, restarted 1806 TIC, and returned facility to normal operation.
Daily Volume (MSCF) 4054
Total Volume (MSCF) 7964
Generated 09/06/2017 4:06:25PM Page 3 of 11
Link, Liz M (DOA)
From: Blake, Jennifer 1 <Jennifer.Blake@bp.com>
Sent: Thursday, September 14, 2017 10:22 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Starck, Jennifer L
Subject: Flaring event at CGF
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc reporting a@alaska.gov victoria.loepp(o)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 08/26/2017 09:30 and stopping at 08/26/2017 14:00 with a volume of 4011
(MSCF). The event lasted for 270 minutes and was due to a T\C 1806 shutdown caused by a control\instrumentation
failure associated with exhaust thermocouples. This caused a process upset in the plant due to both refrigeration
machines being shutdown. The event stopped when the malfunctioned equipment was repaired, 1806 T/C was restarted,
and the facility returned to normal operation..
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.bla ke @ bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CGF B
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I September -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,453,509
Pool Name Pool Code Percent
7. Reinjected
4,142,751
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,069
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
23,808
11. Assist Gas
51,121
12. Fuel gas used in lease operations.
2,688,290
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
8,360,548
Lease Use
MCF
15. NGL Gas Equivalent
1,453,509
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3
201,183,064
Commissioner Date
18. Transferred to: (Express as a negative # FS1, FS2, FS3, CCP & GPMA
( P 9 )
-192,822,516
19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,942,615 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�CQ �� Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and t0 a
�/, temperature of 60o F. Authority 20
Printed Name Diane Colley10//,'h
Phone (907) 564-5775 Date IQ � AA
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
September 2017
junplannecl events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/30/2017 1739-1746 400 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 400
Unplanned events greater than 1 hour
See attachments
See attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/11/2017 1649-1704
669 See attachments
See attachments
TOTAL
669
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
400
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
669
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
23,808
Assist
51,121
TOTAL FLARED VOLUME
75,998
Page 2
10/12/2017
2:33 PM
Flare Start Date 0910112017
Flare End Date 09/30/2017
CGF Flare Report Total Volume (MSCF) 1069
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-361 Controlled Blowdown 09/11/2017 4'.49:00 pm 5:04'00 pm 15 min No No Yes BP1\VINZANRA 669
Determination Cause -RC 1805 De -pressured for planned maintenance
Action Taken 1 Bos TIC depressurization Completed.
Daily Volume (MSCF) 669
Generated 1010212017 2'.13:02PM
Total Volume (MSCF) 1069
Page 1 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU iGF B
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I October -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,549,192
Pool Name PoolCode Percent
7. Reinjected
4,273,356
PRUDHOE 640150 100.007/
8. Flared or vented l hour or less
1,401
9. Flared or vented more than 1 hour (see instr.)
20,642
10. Pilot and Purge
24,560
11. Assist Gas
52,674
12. Fuel gas used in lease operations.
2,842,715
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr.
2�J$
Safety
249 694
MCF
14. TOTAL VOLUME (ITEMS 6-12)
8,764,540
Lease Use
MCF
15. NGL Gas Equivalent
1,549,192
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3
220,415,981
' 3 —/q _1
Commissioner Date
18. Transferred to: (Express as a negative #) FSI, FS2, FS3, CCP & GPMA
-211,651,441
19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 2,514,167 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
A Note: All volumes must be corrected
Signature _ A Title Manager Production Taxes andfillRoyalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25 215
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, October 31, 2017 7:58 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM;
Hanus, John M.; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CGF OTL; Buckbee,
Rachel A; Starck, Jennifer L
Subject: Flaring events at CGF
To: AOGCC Reporting CC: Victoria Leopp, AOGCC
Aogcc.reporting( alaska.gov victoria.loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 10/10/2017 22:18 and stopping at 10/11/2017 23:59 with a volume of 17959
(MSCF). The event lasted for 102 minutes and was due to T\C 1805 shutdown due to high downstream pressure. The
event stopped when downstream pressures stabilized and the flare valve closed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Flare Start Date 10101/2017
Flare End Date 10/31/2017
CGF Flare Report Total Volume (MSCF) 22043
Report
Numbe System
Date StartTime Stop Time
Duration
Intermittent
Black Smoke Planned Reported By
Volume
17-391 Controlled Blowdown 10/10/2017 10:18:00 pm 12:00:00 am
102 min
No
No No BP1\CONNK7
17959
Determination Cause
TC 1805 shutdown due to a problem associated with downstream high pressure
Action Taken
1805 T/C depressurized and shut down.
Daily Volume (MSCF)
17959
17-392 Controlled Blowdown 10/11/2017 12:01:00 am 12:52:00 am
51 min
No
No No BPIICONNK7
2683
Determination Cause
-RC 1805 shutdown due to high doom stream pressure
Action Taken
Flare valve closed
Daily Volume (MSCF)
2683
17AOO Controlled Blowdown 10/19/2017 4:03:00 pm 4:05:00 pm
2 min
No
No Yes BPIISPRAGJ
328
Determination Cause
TIC 1805 shutdown for planned maintenance
Action Taken
1805 T/C depressurization completed.
Daily Volume (MSCF)
328
174102 Controlled Slowdown 10/20/2017 10:25:00 am 10:39:00 am
14 min
No
No Yes BPIIDENNSO
255
Determination Cause
Gave 1801 booster compressor a BESD
Action Taken
1801 depressured
17-402 Controlled Blowdown 10/20/2017 10:56:00 am 11:17:00 am
21 min
No
No Yes BP1MENNSO
255
Determination Cause
gave 1802 booster compressor a BESD
Action Taken
1802 depressured
Dairy Volume (MSCF)
510
Total Volume (MSCF) 22043
Generated 11/03/2017 1:17:48PM Page 4 of 8
BP EXPLORATION (ALASKA( INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
October 2017
Unplanned events less than or equal to 1 hour
1
DATE
TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/8/2017
2311-2359
387 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
10/22/2017
2335-2345
88
10/22/2017
2335-2345
88
VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
563
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
10/10-11/17 2218-0052
20,642 See attachments
See attachments
TOTAL
20,642
exceeding 5,000 WE
Planned Events > 1 hour or
Planned events less than or equal to 1 hour
exceeding 5,000 MCF
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
10/19/2017 1603-1605
328 See attachments
See attachments
10/20/2017 1025-1039
255
10/20/2017 1056-1117
255
TOTAL
838
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL 0
See attachments
Page 3
11/13/2017
9 27 AM
TOTAL
Unplanned Events < 1 Hour
563
Unplanned Events > 1 Hour
20,642
Planned Events < 1 hour and not
838
exceeding 5,000 WE
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
24,560
Assist
52,674
TOTAL FLARED VOLUME
99,277
See attachments
Page 3
11/13/2017
9 27 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PB CGF B
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I November -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,565,733
Pool Name Pool Code Percent
7. Reinjected
3,974,898
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
2,317
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
23,873
11. Assist Gas
53,002
12. Fuel gas used in lease operations.
2,741,465
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
8,361,288
Lease Use
MCF
15. NGL Gas Equivalent
1,565,733
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: FS1, FS2, FS3, GC1, GC2 8 GC3
218,589,076
Commissioner Date
18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP 8 GPMA
-210,227,788
19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 2,824,284 msof
I hereby certify that the foregoing is true and correct to the best of my knowledge.
(/ )/n t e Note: All volumes must be Corrected
Signature i_fK.!/, U Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT Page 2
November 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/16/2017 1036-1041 27 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
11/22/2017 2219-2302 430
TOTAL 457
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
11/10/2017 0006-0016
190 See attachments
See attachments
11/10/2017 0334-0344
430
11/13/2017 0241-0251
190
11/13/2017 0459-0509
430
11/14/2017 1528-1538
190
11/14/2017 1645-1655
430
TOTAL
1,860
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
457
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
1,860
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
23,873
Assist
53,002
TOTAL FLARED VOLUME
79,192
12/13/2017
9:07 AM
Flare Start Date 11/01/2017
Flare End Date 11/30/2017
CGF Flare Report Total Volume (MSCF) 2317
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-425 Controlled Blowdown 11/10/2017 12:06:00 am 12:16:00 am 10 min No No
Yes BPI\OKINELKJ
190
Determination Cause TC 1884 depressured for water wash.
Action Taken 1884 TIC depressurized and shut down. Volume indicated on Meter 618.
17-425 Controlled Blowdown 11/10/2017 3:34:00 am 34400 am 10 min No No
Yes BP1\OKINELKJ
430
Determination Cause T\C 1884 shutdown for planned maintenance.
Yes BP1\OKINELKJ
190
Action Taken 1884 T/C depressurized and shut down post spin cooling. Volume indicated on Meter 618.
Action Taken 1886 T/C depressurized and shut down. Volume indicated on Meter 618.
Daily Volume (MSCF)
620
17-427 Controlled Blowdown 11/13/2017 2:41:00 am 2:51:00 am 10 min No No
Yes BP1\OKINELKJ
190
Determination Cause T1C 1885 depressured for waterwash.
Action Taken 1885 T/C depressurized and shut down. Volume indicated on Meter 618.
17-427 Controlled Blowdown 11/13/2017 4:59:00 am 5:0900 am 10 min No No
Yes BP7\OKINELKJ
430
Determination Cause T\C 1885 depressured for water wash.
Action Taken 1885 TIC depressurized and shut down post- spin cool. Volume indicated on Meter 618.
Daily Volume (MSCF)
620
17-428 Controlled Blowdown 11/14/2017 3:28:00 pm 3:38:00 pm 10 min No No
Yes BP1\OKINELKJ
190
Determination Cause T\C 1886 shutdown for planned maintenance.
Action Taken 1886 T/C depressurized and shut down. Volume indicated on Meter 618.
17-428 Controlled Blowdown 11/14/2017 4:45:00 pm 4:55:00 pm 10 min No No
Yes BPI\OKINELKJ
430
Determination Cause T\C 1886 depressured for water wash.
Action Taken 1886 T/C depressurized. Volume indicated on Meter 618.
Daily Volume (MSCF)
620
Total Volume (MSCF) 2317
Generated 12/06/2017 92230AM Page 2 of 6
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000008
Facility Name
PBU CGF B
3. Field
PBU - EOA
4. Operator
BP
5. Month/year of Disposition
I December -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Tota! Volume.
6. Sold
1,648,542
Pool Name Pool Code Percent
7. Reinjected
4,224,440
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
642
9. Flared or vented more than 1 hour (see instr.)
1,131
10. Pilot and Purge
24,707
11. Assist Gas
51,606
12. Fuel gas used in lease operations.
3,121,127
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
MOO
Safety
7
MCF
14. TOTAL VOLUME (ITEMS 6.12)
9,072,195
Lease Use
MCF
15. NGL Gas Equivalent
1,648,542
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: FSI, FS2, FS3, GC1, GC2 & GC3
230,959,179_
3 _!
Commissioner !Date
18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP 8 GPMA
-221,886,984
19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 3,789,719 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature °�vl Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
t� temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date J AAC25 235,
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
events less than or equal to 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING AND VENTING INCIDENT REPORT
December 2017
utbLHIFI [UN OF INCIDENT & CAUSE
Not required for events <= 1 hr
ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr
TOTAL
0
Unplanned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/29-30/2017 0304-0245
1,131 See attachments
See attachments
TOTAL
1,131
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/10/2017 0937-1002
255 Not required for events <= 1 hr
Not required for events <= 1 hr
12/26/2017 1726-1737
387
TOTAL
642
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
1,131
Planned Events < 1 hour and not
642
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
24,707
Assist
51,606
TOTAL FLARED VOLUME
78,086
Page 3
1/12/2018
9:58 AM
Flare Start Date 12/01/2017
Flare End Date 12/31/2017
CGF Flare Report
Total Volume (MSCF)
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
18-5 Flare Relief 12/29/2017 3:04:00 am 11:59:00 pm 1255 min Yes
Determination Cause Starting up WOA MI.
Action Taken Flare valve closed
18-6 Flare Relief 12/30/2017 12:01:00 am 2:45:00 am 164 min Yes
Determination Cause Startup WOAMI
Action Taken Flare valve closed
No No BP1\SPRAGJ 1127
No No BP1WRAGJ 4
Generated 01/08/2018 10.33:46AM Page 3 of 9