Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU FS 1 - BP Exploration (Alaska), Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2017
Facility: PBU FS 1
Operator: BP EXPLORATION (ALASKA) INC.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000028
Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I January -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
4,722
9. Flared or vented more than 1 hour (see instr.)
46,569
10. Pilot and Purge
21,458
11. Assist Gas
54,933
12. Fuel gas used in lease operations.
661,646
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
/ Slv
v
MCF
14. TOTAL VOLUME (ITEMS 6-12)
789,328
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from: CGF
183,751
•~/—[.`-
18. Transferred to: (Express as a negative #) CGF 8 CCP
-71,197,812
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
//� l Y�L Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
_ temperature of 60o F. Authority 20
Printed Name Diane Colle Phone (907) 564-5775 Date AAC25.235.
v'T1--
.3/2f/ 1,4 --
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
-^•� IvULUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/2/2017 0315-0452 18,861 See attachments See attachments
1/2/2017 2111-2324 27,708
TOTAL 46,569
Planned events less than or equal to 1 hour
See attachments
TOTAL 0
See attachments
TOTAL 0
BP EXPLORATION (ALASKA) INC.
Unplanned Events < 1 Hour
PRUDHOE BAY UNIT - FS -1
Unplanned Events> 1 Hour
GAS FLARING INCIDENT REPORT
Planned Events < 1 hour and not
January 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/23/2017 1820-1854 4,722
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 4,722
21,458
-^•� IvULUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/2/2017 0315-0452 18,861 See attachments See attachments
1/2/2017 2111-2324 27,708
TOTAL 46,569
Planned events less than or equal to 1 hour
See attachments
TOTAL 0
See attachments
TOTAL 0
See attachments
See attachments
Page 3
2/12/2017
5:13 PM
TOTAL
Unplanned Events < 1 Hour
4,722
Unplanned Events> 1 Hour
46,569
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
21,458
Assist
54,933
TOTAL FLARED VOLUME
127,682
See attachments
See attachments
Page 3
2/12/2017
5:13 PM
Flare StartDate 01101/2017
Flare End Date 01/31/2017
FS1 Flare Report Total Volume (MSCF) 51291
Report
Numbe System
Date Start Time Stop Time Duration Intermittent Black Smoke Planned
Reported By
Volume
17-3 Flare Relief 01/02/2017 3:15:00 am 4:52:00 am 97 min No No No
BPt\BUTLRM
18861
Determination Cause
High gas transit line pressure caused by CGF compressor problems due to 182 booster.
Action Taken
Flared off P149V at 300M rate.
17-3 Flare Relief 01102/2017 9:11:00 pm 11:24:00 pm 133 min No No No
BP1\BUTLRM
27708
Determination Cause
High gas transit line pressure caused by CGF compressor problems due to booster 182 shutdown.
Action Taken
Shut in wells,18-7, 18-13, 2-12, 2-7, 2-35, 2-18 and Flared off P149V at 300MM
Daily Volume (MSCF)
46569
Total Volume (MSCF) 51291
Generated 02/02/2017 11:09:42AM Page 3 of 8
Link, Liz M (DOA)
From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Wednesday, January 04, 2017 11:59 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A
Subject: Flaring Events at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reoorting(a alaska.gov
From: Jennifer Blake, GPB Production Team Leader
A la�nrr grad a F�S1 starting at 12/18/2016 05:00 and stopping at 12/18/2016 15:50 with avo ume of 4062
(MSCF). The event lasted for 65D-minrrt�s..anndd was due to a STV/IP compressorIB25-shutdown-ffor planned PSV
maintenance. The event stopped when the STV/ P -Co r -v a -loaded.
A flaring event occurred at FS a 12/26/2016 23:00 and stopping at 00:00 1212712016 with a volume of 5208
(MSCF). The a volume greater than 5000 (MSCF) and was due to an LPS Compressor Ma-shutdcwn caused
b� em associated with the seal oil system. The event stopped when LP wells were shut in.
A flaring event occurred at FS1 starting at 01/02/2017 03:15 and stopping at 01/02/2017 04:52 with a volume of 18861
(MSCF). The event lasted for 97 minutes and was due to high gas transit line pressure caused by CGF's 1&2 booster
compressors tripping offline. The event stopped when transit gas line pressure was lowered.
A flaring event occurred at FS1 starting at 01/02/2017 21:11 and stopping at 01/02/2017 23:24 with a volume of 27708
(MSCF). The event lasted for 133 minutes and was due to high gas transit line pressure caused by CGF's 1&2 booster
compressors tripping offline. The event stopped when rates were cut and the transit gas line pressure was lowered.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCFn [,nS n1cPnc1T1nA1
--
1, Facility Number 2. Facility Name
0290000028 PBU FS 1
Disposition
---------
3. Field
PBU - EOA
Volume MCF
--.- -.V. VV...V..
4. Operator 5. MonthNear of Disposition
BP February -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
6,805
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
32,552
11, Assist Gas
49,569
12. Fuel gas used in lease operations.
588,594
13. Other (see instructions)
0
Official Use Only
Authorization 71 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
677,520
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
171,057
18. Transferred to: (Express as a negative #) CGF & CCP
-62,868,197
Commissioner Date
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
u� Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
7 temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date..td AAC25.235.
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
February 2017
unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/15/2017 1512-1545 4,583 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
2/17/2017 0709-0725 2,222
TOTAL 6,805
DATE
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
6,805
0
0
0
32,552
49,569
88,926
Page 5
3/15/2017
10:10 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
March -2017
Disposition
Volume MCF
20. Forproduchon from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. SoldO
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
3,621
9. Flared or vented more than 1 hour (see instr.)
7,914
10. Pilot and Purge
34,278
11. Assist Gas
66,241
12. Fuel gas used in lease operations.
659,271
13. Other (see instructions)
Official Use Only
Authorization>t hr:
Safety
GVT
� / `�
MCF
-5—/u9
14. TOTAL VOLUME (ITEMS 6-12)
771,325
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
IT Transferred from: CGF
189,983
S- 'l —
18. Transferred to: (Express as a negative #) CGF & CCP
-73,106,791
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
//ry �q Note: All volumes must be corrected
Signature t(;el tX �,���. Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Dale AAC25.235.
r�
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
March 2017
junplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/21/2017 1420-1445 336 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
3/21/2017 1440-1452 2,916
TOTAL 3,252
CAUSE
See attachments
ACTION TAKEN TO I
See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/21/2017 0214-0245 369 See attachments See attachments
TOTAL 369
3/20-21/17
0352-0025
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
7,914 See attachments
7,914
TOTAL
3,252
0
369
7,914
34,278
66,241
112,054
ACTION TAKEN TO I
See attachments
Page 4
4/13/2017
10:32 AM
Link, Liz M (DOA)
From:
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, April 10, 2017 11:21 AM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A
Subject:
Flaring Event at FSI
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reporting Qalaska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 03/20/2017 03:52 and stopping at 03/20/2017 23:59 with a volume of 7753
(MSCF). The event lasted for 1207 minutes and was due to a STWIP compressor (1825) shutdown for planned
maintenance. The event stopped when the STV/IP Compressor was reloaded shortly after midnight.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCFn rnS nicpnc1T1nk1
i. facility Numder 2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
P — — w w • • v •
4. O tor 5 MomhKear of Disposition
BPeraAril-2017
20. Forproduchon from multiple pools, list contribution of each pod as a percent of
Total Volume
6. Sold
0
Pool Nam'
Pool Code
Percent
7. Reinjected
0
PRUDHOE
640150
100.00%
B. Hared or vented 1 hour or less
8,333
9. Flared or vented more than 1 hour (see inso.)
4,020
10. Pilot and Purge
23,025
11. Assist Gas
93,838
12. Fuel gas used in lease operations.
622,928
13. Other (see instructions)
0
Official Use OnlyAulhori2ation
>1 hr:
Safety /�,
MCF1 .7_,
:__
14. TOTAL VOLUME (ITEMS 6-12)
752,144
Lease Use q
gjy7e�
MCF(�_I
15. NGL Gas Equivalent
0
Conservation
MCF
18. Purchased gas
0
Waste:
MCF
17. Transferred from: COT
176.770
18 Transferred to. (Express as a negative 0) CGF 8 CCP
-64,298,842
Commissioner Date
19 Remarks:
10
I hereby certify that the foregoing is true and correct to the test of my knowledge.
^ ' Note: All volumes must be corrected
SignatureTitle Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
Printed Name Diane ColleyPhone (907) 564-5775 Date �))/'L} temperature of 60o F. Authority 20AAC25-235.
2F7v—1
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
TOTAL
n
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-1
GAS FLARING INCIDENT REPORT
April 2017
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
4/14/2017 0730-1000
----' -- -
1,187 See attachments
n�I mlv Inp[IY ILl eLIWI[NAIL LAUSE
4/17/2017 1330-2200
2,833
See attachments
TOTAL
4,020
Planned events less than or equal to 1 hour
DATE TIME
4;10/2017
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
1750-1825
8,333 See attachments
See attachments
TOTAL
8,333
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events<1 Hour
0
Unplanned Events > 1 Hour
4,020
Planned Events < 1 hour and not
8,333
exceeding 5,000 MCF
Planned Events> i hour or
0
exceeding 5,DO0 MCF
Pilot Purge
23,025
Assist
93,838
TOTAL FLARED VOLUME
129,216
Page 4
5/14/2017
2:06 PM
Flare Start Date 04101/2017
Flare End Date 04,30/2017
FS1 Flare Report Total Volume (MSCF) 12353
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
-. nmc.cener u41IW2017 5.50:00pm 6.25O0 on 35mm No
No Yes BP1lGR(MDO
8333
Determination Cause
Flare for field and CGF TC maintenance
Action Taken
Closed Flare valve after maintenance completed.
Daily Volume (MSCF)
8333
17-117 Controlled Blcwdown 04/14/2017 7.30O0 am 1000ocam 150mm No
No No BP1X8ELLZ0
1187
Determination Cause
Bow down of DS2 and associated common lines to FS1 Bare.
Action Taken
Depressurization of DS2 and asscosted common lines complete
Daily Volume (MSCF)
1187
17-124 Other
04117M17 1.3000 pm 1000:00 pm 510 min No
No No 8P14GRIMD0
2533
Determination Cause
STV-M 1825 Shutdown due to a problem associated with IP21 not oommunlCabng
with Honeywell. Problem with Bridgemaster.
Action Taken
Loaded STVlIP 1825.
Daily Volume (MSCF)
2833
Total Volume (MSCF)
12353
1 1636PM
Page 6of 10
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, June 12, 2017 4:56 PM
To: AKOpsProdEOCTL, AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A
Subject: CORRECTION: Flaring Event at FS1
CORRECTION: I had a template copy/paste error in my 04/14/2017 flare report (carry over from the 03/20/2017 report
submitted on 04/10/2017). Please see the revision in below.
Thank you,
Jennifer
From: AKOpsProdEOCTL
Sent: Thursday, May 04, 2017 7:18 AM
To: 'aogcc.reporting@alaska.gov'
Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Benson, Gary A; Arthur, Gregory; Schinagl, Werner;
Fortenberry, Christopher; AK, HSSEE Env Adv East; AK, OPS FSl Facility OTL; AK, OPS FS1 OSM; Glover, Robin; Buckbee,
Rachel A
Subject: Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Loepp. AOGCC
aOgC. reROftt;M1q lCLaIa9ka.00J
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 04/10/2017 17:50 and stopping at 04/10/2017 18:25 with a volume of 8333
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to a CGF Tandem Compressor unloading for
further adjustments in follow-up to earlier repairs. The event stopped when field rates were cut and the T/C was
reloaded.
A flaring event occurred at FS1 starting at 04/14/2017 07:30 and stopping at 04/14/2017 10:00 with a volume of 1187
(MSCF). The event lasted for 150 minutes and was due to
A flaring event occurred at FS1 starting at 0411712017 13:30 and stopping at 04/17/2017 22:00 with a volume of 2833
(MSCF). The event lasted for 510 minutes and was due to a STV/fP compressor (1825) shutdown due to a problem
associated with one control system (IP.21) not communicating with a different control system (Honeywell) due to failure of
a communication protocol (Bridgemaster). The event stopped when the STVAP Compressor was reloaded.
Thanks,
)enni/er 81oke
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jell II f_c-r, b_ak<,a o
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, May 4, 2017 7:18 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Weiner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A
Subject: Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 04110/2017 17:50 and stopping at 04/10/2017 18:25 with a volume of 8333
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to a CGF Tandem Compressor unloading for
further adjustments in follow-up to earlier repairs. The event stopped when field rates were cut and the TIC was
reloaded.
A flaring event occurred at FS1 starting at 04/14/2017 07:30 and stopping at 04/14/2017 10!00 with a volume of 1187
(MSCF). The event lasted for 150 minutes and was due to a STV/IP compressor (1825) shutdown for planned
maintenance. The event stopped when the STV/IP Compressor was reloaded shortly after midnight
A flaring event occurred at FS1 starting at 04117/2017 13:30 and stopping at 04/17/2017 22:00 with a volume of 2833
(MSCF). The event lasted for 510 minutes and was due to a STV/IP compressor (1825) shutdown due to a problem
associated with one control system (IP.21) not communicating with a different control system (Honeywell) due to failure of
a communication protocol (Bridgemaster). The event stopped when the STV/IP Compressor was reloaded.
Thanks,
jufmwfcr 31uke
EOC Production Optirni7atmfl Team Lean!
Office (907) 564 5926
C(III iPCM 93G-6 Uu
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, April 18, 2017 3:23 PM
To: Loepp, Victoria T (DOA); Regg, James B (DOA); 'aogcc.reporting@aiaska.gov'
Cc: AK, OPS FS1 Field OTL; AK, OPS FS1 OSM; Loader, Neil; Benson, Gary A; Arthur, Gregory;
AK, HSSEE Env Adv East; AK, HSSEE Env TL (North Slope); Schinagl, Werner, Buckbee,
Rachel A; Buckendorf, Randal; Burden, Andrew J; Covey, Jasper O
Subject: FS1 DS2 Well 3 Uncontrolled Release 5 Day Report
Attachments: 5 Day AOGCC Report - FS1 DS2 Well 3.pdf
Victoria Leopp & Jim Regg,
Please find enclosed the 5-day report for the release which occurred at FS1 Drill Site 2 Well 3, on
4114/2017. This was also faxed to 907-276-7542.
Please give me a call if you have further questions. A 30-day report will be provided after completion of the
incident investigation.
Regards,
PCC/EOC Produt ton O ,tinusatkm Tr:)am Lead (u!t Davit; S�xrl!)
Office 19071659-i47=
Cell (907) 8.30-6204
,pA/111/2017 TVE 15:39 FAX 907 554a 5587 BFXA 11th Floor 20011002
BP Exploration (Alaska) Inc.
P.O. Box 196612, Anchorage, AK 99519-6612
REPORT OF ACCIDENTAL OIL AND/OR GAS RELEASE
(36-day report per 20 ACC 25.205 (b))
Dato:71612015
For Ail Releases To:
Chairman
Alaska Oil and Gas Conservation Commission
333 W. 7tb Ave, Suite 100
Anchorage, AK 99501-3539
Fax. (907)276-7542
DESCRIPTION OF RELEA E
'L_DAta and Tim&• k
All df9017. of annmY1matah, n7M am
Aadami
_Northstar
Other
3. Volume of oil andlor natural gas released
_
Released: No estimate of the leak volume Is available at
and recovered:
this time
Recovered: There is no recovered volume available yet.
Once the well is secured downhols, BPXA will work with
their Oil Spill Response Organization, Alaska Clean Seas
to begin delineation and response clean-up efforts under
the plan that has been approved by the Unified Command
BP, EPA, ADEC, NSB)
4. Cause of release:
Unknown at this time.
5. Responsive actions taken to prevent
SSV closed, drill site shut in, and common lines leaving
additional releases:
DS2 do -pressure to flare. iMT formed and response action
worked under direction of the Unified Command. ADEC as
the State agency on the unified command acted as the
lisson with the AOGCC. On Monday April 17 the well was
killed and on Tuesday April Id' plans to install a
mechanical plug were approved by the Unified Command
and AOGCC.
6. Plans, actions, equipment or procedural
Unknown at this time.
rhnnmpq to nrcvnnf nr In(mHo rfc4 n
Signature:
__
CC: Jim Regg, AOGCC dJ
Victoria Leopp, AOGCC
Jennifer Hunt, AOGCC
04/18/2017 TUE 15t19 PAX 907 564 5949 anCp182
0002/002
BPX Air Quality Technical Authority MB 11-6 (Fax: 564-5020)
BPX Volume Accounting MS 12-4 (Fax: 564-4094)
East Area Operations Manager, 11-62B
Production Optimization Team Leader, F-1
04/18/2017 TUB 15!24 FAX 907 564 5949 sncp182 Z001/002
SP Exploration (Alaska) Inc
P.O. Box 196612, Anchorage, AK 99519-6612
REPORT OF ACCIDENTAL OIL AND/OR GAS RELEASE
(30-day report per 20 ACC 25.205 (b))
Date:91612016
For All Releases To;
Chairman
Alaska Oil and Gas Conservation Commission
W1812017 TUE 15!24 Fax 907 564 5949 ancP182
0002/002
BPX Air Quality Technical Authority MB 11-6 (Fax 564-5020)
BPX Volume Accounting MB 12-4 (Fax: 564-4094)
Cast Area Operations Manager, 11-62B
Production Optimization Team Leader, F-1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCFn GAS nicpnciTinN
1. Facility Number2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator . •... • 5. MonthNear of Disposition
BP Aril -2017
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
p
PRUDHOE 640150 100.00°/
8. Flared or vented 1 hour or less
8,333
9. Flared or vented more than 1 hour (see instr.)
4,020
10. Pilot and Purge
23,025
11. Assist Gas
93,838
12. Fuel gas used in lease operations.
622,928
13. Other (see instructions)
G
Official Use Only
Authorization
4 C 2-C
MCF
k
TOTAL VOLUME (ITEMS 6-12)
752,144
se
MCF
15. NGL Gas Equivalent
Q
ation
MCF
16. Purchased gas
:
MCF
17. Transferred from: CGF
176770
-27 -�
Commissioner Date
18. Transferred to: (Express as a negative #) CGF 8 CCP
-64,298'842
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
����j �l�, Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 4417 AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
events less than or equal to 1
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
April 2017
Not required for unplanned events <= 1 hr
0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
0
TOTAL
0
4,020
8,333
0
23,025
93,838
129,216
See attachments
Page 4
5/14/2017
2:06 PM
vuwmt UL9CKIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/14/2017
0730-1000
1,187 See attachments
See attachments
4/17/2017
1330-2200
2,833
TOTAL
4,020
Planned events less than or equal to 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/10/2017
1750-1825
8,333 See attachments
See attachments
TOTAL
8,333
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
0
TOTAL
0
4,020
8,333
0
23,025
93,838
129,216
See attachments
Page 4
5/14/2017
2:06 PM
Flare Start Date 04/01/2017
Flare End Date 04/30/2017
FSI Flare Report
Total Volume (MSCF) 12353
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-112 Flare Relief 04/10/2017 5:50:00 pm 6:25:00 pm 35 min No No Yes BP1%GRIMDO 8333
Determination Cause Flare for field and CGF T/C maintenance.
Action Taken Closed Flare valve after maintenance completed.
Daily Volume (MSCF) 8333
17-117 Controlled Blowdown 04/14/2017 7:30:00 am 10:00:00 am 150 min No No No BP1%BELLZO 1187
Determination Cause Blow down of DS2 and associated common lines to FS1 Flare.
Action Taken Depressurization of DS2 and associated common lines complete.
Daily Volume (MSCF) 1187
17-124 Other 04/17/2017 1:30:00 pm 10:00:00 pm 510 min No No No SP7\GRIMDO 2833
Determination Cause STV -IP 1825 shutdown due to a problem associated with IP21 not communicating with Honeywell. Problem with Bndgemaster.
Action Taken Loaded STV/IP 1825.
Daily Volume (MSCF) 2833
Total Volume (MSCF) 12353
Generated 05/02/2017 1:16:36PM Page 6 of 10
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, June 12, 2017 4:56 PM
To: AKOpsProdEOCTL; AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher, AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A
Subject: CORRECTION: Flaring Event at FS1
CORRECTION: I had a template copy/paste error in my 04/14/2017 flare report (carry over from the 03/20/2017 report
submitted on 04/10/2017). Please see the revision in red below.
Thank you,
Jennifer
From: AKOpsProdEOCTL
Sent: Thursday, May 04, 2017 7:18 AM
To: 'aogcc.reporting@alaska.gov'
Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Benson, Gary A; Arthur, Gregory; Schinagl, Werner;
Fortenberry, Christopher; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; Glover, Robin; Buckbee,
Rachel A
Subject: Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reporting(a)alaska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 04/10/2017 17:50 and stopping at 04/10/2017 18:25 with a volume of 8333
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to a CGF Tandem Compressor unloading for
further adjustments in follow-up to earlier repairs. The event stopped when field rates were cut and the T/C was
reloaded.
A flaring event occurred at FS1 starting at 04/14/2017 07:30 and stopping at 04/14/2017 10:00 with a volume of 1187
(MSCF). The event lasted for 150 minutes and was due to an unplanned event that required blowing down drill site 02 and
the associated common lines to flare. The event stopped DS02 and the associated common lines were depressurized.
A flaring event occurred at FS1 starting at 04/17/2017 13:30 and stopping at 04/17/2017 22:00 with a volume of 2833
(MSCF). The event lasted for 510 minutes and was due to a STV/IP compressor (1825) shutdown due to a problem
associated with one control system (IP.21) not communicating with a different control system (Honeywell) due to failure of
a communication protocol (Bridgemaster). The event stopped when the STV/IP Compressor was reloaded.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jen nifer.bla kePbp.com
Link, Liz M (DOA)
From:
AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Thursday, May 4, 2017 7:18 AM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory, Schinagl, Werner; Fortenberry,
Christopher, AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 CSM;
Glover, Robin; Buckbee, Rachel A
Subject:
Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoqcc. reporting (dalaska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 04/10/2017 17:50 and stopping at 04/10/2017 18:25 with a volume of 8333
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to a CGF Tandem Compressor unloading for
further adjustments in follow-up to earlier repairs. The event stopped when field rates were cut and the T/C was
reloaded.
A flaring event occurred at FS1 starting at 04/14/2017 07:30 and stopping at 04/14/2017 10:00 with a volume of 1187
(MSCF). The event lasted for 150 minutes and was due to a STV/IP compressor (1825) shutdown for planned
maintenance. The event stopped when the STV/IP Compressor was reloaded shortly after midnight.
A flaring event occurred at FS1 starting at 04/17/2017 13:30 and stopping at 04/17/2017 22:00 with a volume of 2833
(MSCF). The event lasted for 510 minutes and was due to a STV/IP compressor (1825) shutdown due to a problem
associated with one control system (IP.21) not communicating with a different control system (Honeywell) due to failure of
a communication protocol (Bridgemaster). The event stopped when the STV/IP Compressor was reloaded.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, April 18, 2017 3:23 PM
To: Loepp, Victoria T (DOA); Regg, James B (DOA); 'aogcc.reporting@alaska.gov'
Cc: AK, OPS F51 Field OTL; AK, OPS FS1 OSM; Loader, Neil; Benson, Gary A; Arthur, Gregory;
AK, HSSEE Env Adv East; AK, HSSEE Env TL (North Slope); Schinagl, Werner; Buckbee,
Rachel A; Buckendorf, Randal; Burden, Andrew 1; Covey, Jasper 0
Subject: FS1 DS2 Well 3 Uncontrolled Release 5 Day Report
Attachments: 5 Day AOGCC Report - FS1 DS2 Well 3.pdf
Victoria Leopp & Jim Regg,
Please find enclosed the 5 -day report for the release which occurred at FS1 Drill Site 2 Well 3, on
4/14/2017. This was also faxed to 907-276-7542.
Please give me a call if you have further questions. A 30 -day report will be provided after completion of the
incident investigation.
Regards,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
(lI4/1 T1VE 15:39 FAX 907 564 5587 EPxA lith Floor 0001/002
BP Exploration (Alaska) Inc.
P,O. Box 186612, Anchorage, AK 99519-6612
REPORT OF ACCIDENTAL OIL AND/OR GAS RELEASE
0 -day report per 20 ACC 25.205 (b))
5 -
Date:7/8/2016
For
For All Releases To:
Chairman
Alaska Oil and Gas Conservation Commission
333 W. 7t' Ave, Suite 100
Anchorage, AK 99501-3539
Fax: (907) 276-7542
DESCRIPTION OF RELEA E
—DAFAI Anrl Tlma,
d��Q('�n�]_ nnnmvimnfP1%, n7nn Am
_Aadami
Northstar
Other
3. Volume of oil and/or natural gas released
Released: No estimate of the leak volume Is available at
and recovered:
this time
Recovered: There is no recovered volume available yet.
Once the well is secured downhole, BPXA will work with
their Oil Spill Response Organization, Alaska Clean Seas
to begin delineation and response clean-up efforts under
the plan that has been approved by the Unified Command
8P, EPA, ADEC, NSB).
4. Cause of release:
Unknown at this time.
5. Responsive actions taken to prevent
SSV closed, drill site shut in, and common lines leaving
additional releases:
DS2 de -pressure to flare. IMT formed and response action
worked under direction of the Unified Command. ADEC as
the State agency on the unified command acted as the
liason with the AOGCC. On Monday April 17 the well was
killed and on Tuesday April 1 B4i plans to Install a
mechanical plug were approved by the Unified Command
and AOGCC.
S. Plans, actions, equipment or procedural
Unknown at this time.
nhennn }n nravAn} nr rplmlmlv& ride n
Signature:
cc: Jim Regg, AOGCC
Victoria Leopp, AOGCC
Jennifer Hunt, AOGCC
04/18/2017 TUE 15:19 FAX 907 564 5969 anop182 0002/002
BPX Air Quality Technical Authority MB 11-6 (Fax: 564-5020)
BPX Volume Accounting MB 12-4 (Fax: 564-4094)
East Area Operations Manager, 11-62B
Production Optimization Team Leader, F-1
06/18/2017 TUE 15:26 aax 907 566 5969 ancp182 ®001/002
SP Exploration (Alaska) Inc.
P.O. Box 196612, Anchorage, AK 99519-6612
REPORT OF ACCIDENTAL OIL AND/OR GAS RELEASE
(30 -day report per 20 ACC 25.205 (b))
Date:7/512015
For All Releases To:
Chairman
Alaska Oil and Gas Conservation Commission
04/18/2017 TUE 15:26 FAX 907 564 5949 ancp182
BPX Air Quality Technical Authority MB 11-6 (Fax 564-5020)
SPX Volume Accounting MB 124 (Fax: 564-4094)
Beast Area Operations Manager, 11-628
Production Optimization Team Leader, F-1
2002/002
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCFD [.oS n1Sanc1T1nti
1. Facility Number2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP May -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
T Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
9,167
9. Flared or vented more than 1 hour (see instr.)
530
10. Pilot and Purge
22,987
11, Assist Gas
93,085
12. Fuel gas used in lease operations.
604,242
13. Other (see instructions)
0
Official Use Only
Authorization >1 h[
Safety
C3�
J
MCFy.J
14. TOTAL VOLUME (ITEMS 6-12)
730,011
Lease Use
M F
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
164,318
'/ —7
77
18. Transferred to: (Express as a negative #) CGF & CCP
-66,957,875
Commissioner Date
19. Remarks:
I hereby certify that the �forego ing is true and correct to me best of my knowledge.
�l�I rC L4 Note: All volumes must be corrected
Signature_ C'^ Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
— temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
1_
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
May 2017
junplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/19/2017 1605-1637 6,667 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 6,667
-
I-- IwLwsvll ucua.mr i wry ur nrmum l & wuoe ACTION TAKEN TO ELIMINATE CAUSE
5/19/2017 1605-1714 431 See attachments See attachments
TOTAL 431
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/9/2017 0745-0805 2,500 See attachments See attachments
TOTAL 2,500
UA H, TIME
VOLUME DESCRIPTION OF IN
5/13/2017 0530-0700
99 See attachments
TOTAL
99
TOTAL
Unplanned Events < 1 Hour
6,667
Unplanned Events > 1 Hour
431
Planned Events < 1 hour and not
2,500
exceeding 5,000 MCF
Planned Events> 1 hour or
99
exceeding 5,000 MCF
Pilot Purge
22,987
Assist
93,085
TOTAL FLARED VOLUME
125,769
See attachments
Page 3
6/14/2017
1:58 PM
Flare Start Date 05/01/2017
Flare End Date 05/31/2017
FS1 Flare Report Total Volume (MSCF) 9697
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-152 Other 05/09/2017 7:45:00 am 8:05:00 am 20 min No No Yes BP1\GRIMD0 2500
Determination Cause High gas transit line pressure caused by CGF [rooster cool stop.
Action Taken CGF booster loaded up and completed the cool stop.
17-166 Other 05/13/2017 5:30:00 am 70000 am 90 min No
Determination Cause Oepressurizing 5D and 5B for choke repairs at drill site.
Action Taken Depressurization completed.
17-179 Flare Relief 05/19/2017 4:05:00 pm 5:14:00 pm 69 min No
Determination Cause STV -IP T\C 1825 unloaded due to low gas rates.
Action Taken Loaded STV/IP 1825 T/C,
No Yes BPI\GRIMDO 99
No No BPI\BUTLRM 431
Total Volume (MSCF) 9697
Generated 06/09/2017 2:22:08PM Page 3 of 9
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, May 18, 2017 12:42 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A; Dean, lames A
Subject: Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reporting(d.alaska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 05/13/2017 05:30 and stopping at 05/13/2017 07:00 with a volume of 99
(MSCF). The event lasted for 90 minutes and was due to depressurizing Common Lines 5D and 5B for choke repairs at
the drill site. The event stopped when depressurization was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: Blake, Jennifer! <Jennifer.Blake@bp.com>
Sent: Wednesday, June 14, 2017 9:27 AM
To: AKOpsProdEOCTL; AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS FSI Facility OTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A; Dean, lames A
Subject: Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reporting (o)alaska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 05/19/2017 16:05 and stopping at 05/19/2017 16:37 with a volume of 6667
(MSCF). The event was due to a shutdown of T/Compressor 1804 due to a problem associated with F-61AV. The event
stopped when 1804 was restarted.
A flaring event occurred at FS1 starting at 05/19/2017 16:05 and stopping at 05/19/2017 17:14 with a volume of 431
(MSCF). The event lasted for 69 minutes and was due to STV -IP Compressor 1825 unloading due to low gas rates. The
event stopped when 1825 was reloaded.
A flaring event occurred at FS1 starting at 06/12/2017 16:45 and stopping at 06/12/2017 18:00 with a volume of 610
(MSCF). The event lasted for 75 minutes and was due to depressurizing Common Line 18B to flare due to a leaking
valve. The event stopped when depressurization was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blakePbp.com
Flare Start Date 05/01/2017
Flare End Date 05/31/2017
FSI Flare Report
Total Volume (MSCF)
9697
Report
Numbe System
Date Start Time Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
17-152 Other
05/09/2017 7:45:00 am 8:05.00 am 20 min No
No Yes BP7\GRIMD0
2500
Determination Cause
High gas transit line pressure mused by CGF booster cool stop.
Action Taken
CGF booster loaded up and completed the cool stop.
17-166 Other
05/13/2017 5:30:00 am 7:00:00 am 90 min No
No Yes BP1\GRIMDO
99
Determination Cause
Depressurizing 5D and 58 for choke repairs at drill site.
Action Taken
Depressurization completed.
17-179 Flare Relief 05/19/2017 4:05:00 pm 5:14:00 pm 69 min No
Determination Cause STV -IP TIC 1825 unloaded due to low gas rates.
Action Taken Loaded STV/IP 1825 T/C.
No No BP1\BUTLRM 431
Total Volume (MSCF) 9697
Generated 06/09/2017 2:22:08PM Page 3 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000028
Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
June -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Q
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
B. Flared or vented 1 hour or less
1,953
9. Flared or vented more than 1 hour (see instr.)
14,611
10. Pilot and Purge
21,568
11, Assist Gas
93,874
12. Fuel gas used in lease operations.
542,655
13. Other (see instructions)
0
Official Use Only
Authorization 11 hr:
Safety
/ �� / l
MCF
14. TOTAL VOLUME (ITEMS 6-12)
674,661
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: COE
143,301
18. Transferred to: (Express as a negative #) CGF & CCP
-51,868,113
Commissioner Date
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
��`�/ �� Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro aloes Alaska to pressure of 14.65 psis and to a
7 temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE TIME
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
June 2017
Not required for unplanned events <= 1 hr
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
TOTAL
0
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
14,611
Unplanned events greater than 1 hour
1,953
exceeding 5,000 MCF
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/12/2017 1645-1800
2,639 See attachments
See attachments
6/23/2017 1013-1200
113
93,874
6/23/2017 1013-2359
11,859
TOTAL
14,611
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/5/2017 1410-1500
1,224 See attachments
See attachments
6/9/2017 0400-0455
683
6/25/2017 0910-0950
46
TOTAL
1,953
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
See attachments
Page 4
7/18/2017
11:37 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
14,611
Planned Events < 1 hour and not
1,953
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
21,568
Assist
93,874
TOTAL FLARED VOLUME
132,006
See attachments
Page 4
7/18/2017
11:37 AM
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, July 3, 2017 11:14 AM
To: AKOpsProdEOCTL; AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS FS1 Facility CTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A; Dean, James A
Subject: Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reportingaalaska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 06/12/2017 16:45 and stopping at 06/12/2017 18:00 with a volume of 2639
(MSCF). The event lasted for 75 minutes and was due to depressurization of the 18B commonline for the Make Piggable
project. The event stopped when depressurization was completed.
A flaring event occurred at FS1 starting at 06/23/2017 10:13 and stopping at 06/23/2017 23:59 with a volume of 11859
(MSCF). The intermittent event lasted for 826 minutes and was due to a plant shutdown and partial depressurization due
to the CPS power failure. The event stopped when production was shut-in (isolated).
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Flare Start Date 06/01/2017
Flare End Date 06/30/2017
FSI Flare Report Total Volume (MSCF) 16564
Report
Numbs System Date StartTime Stop Time Duration Intermittent
Black Smoke
Planned Reported By
Volume
17-196 Flare Relief 06/05/2017 2:10:00 pm 3.0000 pm 50 min No
No
Yes BP1\LYLEPE
1224
Determination Cause Depressuring DS18B/D CL for make piggable project.
Action Taken Completed CL depressunng.
Daily Volume (MSCF)
1224
17-201 Flare Relief 06/09/2017 4:00:00 am 4:55:00 am 55 min No
No
Yes BP1\GRIMDO
683
Determination Cause Depressurization of Annex for reboiler management upgrades, and PSV Pm's.
Action Taken Completed depressurization.
Daily Volume (MSCF)
683
17-205 Flare Relief 06/12/2017 4:45:00 pm 6:00:00 pm 75 min No
No
No BP1\MCCADJ
2639
Determination Cause Operational DE pressure of 18B Common Line to Flare.
Action Taken Completed depressunng.
Daily Volume (MSCF)
2639
17-225 Flare Relief 06/23/2017 10:13:00 am 12:00:00 pm 107 min Yes
No
No BP1\NOBLC4
113
Determination Cause Plant shutdown and partial depressurization due to CPS power failure
Action Taken Shut in production and secured equipment
17-225 Flare Relief 06/23/2017 10:13:00 am 11:59:00 pm 826 min Yes
No
No BP1WOBLC4
11859
Determination Cause Plant shutdown and partial depressurization due to CPS power failure
Action Taken Shut in production and secured equipment
Daily Volume (MSCF)
11972
17-226 Flare Relief 06/25/2017 9:10:00 am 9:50:00 am 40 min No
No
Yes BP1\NOBLC4
46
Determination Cause Depressunzed5BCLfcr PSVPM's
Action Taken Finished depressurization
Daily Volume (MSCF)
46
Total Volume (MSCF)
16564
Generated 07/062017 2:44:22PM Page 4 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSiTinN
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Reid
PBU - EOA
4. Operator •
BP
5. MonthNear of Disposition
Jul -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
13,460
9. Flared or vented more than 1 hour (see matt.)
19,071
10. Pilot and Purge
22,603
11. Assist Gas
67,157
12. Fuel gas used in lease operations.
416,332
13. Other (see instructions)
6
Official Use Only
Authorization >1 he
Safety
g p
MCF
t�T - /a
14. TOTAL VOLUME (ITEMS 6-12)
538,623
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
147,932
Commissioner Dat
18. Transferred to: (Express as a negative #) CGF 8 CCP
-49,786,304
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature cae Title Manager Production Taxes ano Royalties Alaska to pressure of 14.65 psia and to a
Printed Name Diane ColleyPhone (907) 564-5775 Date /� I temperature of 60o F. Authority 20
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
July 2017
----
7/8/2017
••.••-
0930-1025
.vcw.�c vcxmruvry yr ur4rucrvl&vuoc
ACTION TAKEN TO ELIMINATE CAUSE
0430-0500
113
11,500 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
7/14/2017
2205-2216
76
428
7/29/2017
1522-1536
583
7/23/2017
0319-0350
TOTAL
12,159
0125-0142
Unplanned events greater than 1 hour
22,603
TOTAL
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/6/2017
1625-1740
18,000 See attachments
See attachments
TOTAL
18,000
7/1/2017
1352-1415
371 See attachments
7/2/2017
0430-0500
113
7/6/2017
0715-0735
126
7/6/2017
1455-1520
428
7/21/2017
1632-1642
15
7/23/2017
0319-0350
153
7/25/2017
0125-0142
95
22,603
TOTAL
1,301
7/25/2017 1522-1625
253 See attachments
7/29/2017 1925-2245
818
TOTAL
1,071
TOTAL
Unplanned Events < 1 Hour
12,159
Unplanned Events> 1 Hour
18,000
Planned Events < 1 hour and not
1,301
exceeding 5,000 MCF
Planned Events> 1 hour or
1,071
exceeding 5,000 MCF
Pilot Purge
22,603
Assist
67,157
TOTAL FLARED VOLUME
122,291
See attachments
ACTION TAKEN TO f
See attachments
Page 5
8/13/2017
3:49 PM
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, July 27, 2017 8:50 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory, Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM;
Glover, Robin; Buckbee, Rachel A; Dean, James A
Subject: Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reoorting(cD.a laska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 07/06/2017 16:25 and stopping at 07/06/2017 17:40 with a volume of 18000
(MSCF). The event lasted for 75 minutes and was due to high gas transit line pressure caused by CGF compressor
problems. The event stopped when rates were reduced with wells shut-in.
A flaring event occurred at FS1 starting at 07/08/2017 09:30 and stopping at 07/08/2017 10:25 with a volume of 11500
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to a LPS T/C 1803 shutdown. The event
stopped when the LPS T/C 1804 compressor was started up and rates were reduced.
A flaring event occurred at FS1 starting at 07/25/2017 15:22 and stopping at 07/25/2017 16:25 with a volume of 253
(MSCF). The event lasted for 63 minutes and was due to depressurization of the 2B, 2D, 2E, and 5E commonlines for un -
blinding of the 2C commonlines. The event stopped when the commonlines depressurization was complete.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jennifer.blakepbp.com
Flare StartDate 07/01/2017
Flare End Date 07/31/2017
FSS Flare Report Total Volume (MSCF) 32531
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By
Volume
17-239 Flare Relief 07/01/2017 1:52:00 pm 2:15:00 pm 23 min No No
Yes BP1\8ELLZ0
371
Determination Cause Depressurized C -HP separator and C HP gas scrubber to change out L-14 spool.
Action Taken Depressurized C -HP separator and C HP gas scrubberto flare header pressure and blocked
in going to flare.
Daily Volume (MSCF)
371
17-241 Flare Relief 07/02/2017 4:30:00 am 5:00:00 am 30 min No No
Yes BP1\GRIMDO
113
Determination Cause Depressurize 5B,5D, 5E for maintenance activities.
Action Taken Complete depressurization.
Daily Volume (MSCF)
113
17-250 Flare Relief 07/06/2017 7:15:00 am 7:35:00 am 20 min No No
Yes BP7\GRIMDO
126
Determination Cause Depressurizing 2D and 2B oommonlines to flare header pressure for make piggable project.
Action Taken Completed depressurization
17-250 Flare Relief 07/06/2017 2:55:00 pm 3:20:00 pm 25 min No No
Yes BP1\GRIMD0
428
Determination Cause Depressurizing 2C and 2E oommonlines to flare header pressure for make piggable project.
Action Taken Completed depressurization
17-250 Flare Relief 07/06/2017 4:25:00 pm 5:40:00 pm 75 min No No
No BPI\GRIMDO
18000
Determination Cause High gas transit line pressure caused by CGF compressor problems. Flare for field.
Action Taken Shut in wells. Field stabilized at lower rate.
Daily Volume (MSCF)
18554
17-284 Other 07/21/2017 4:32:00 pm 4:42:00 pm 10 min No No
Yes BP7\NOBLC4
15
Determination Cause -RC 1804 Startup. The starting Copus motor vents to flare.
Action Taken Completed Start up of 1804 compressor
Daily Volume (MSCF)
15
17-287 Controlled Blowdoom 07/23/2017 3:19:00 am 3:50:00 am 31 min No No
Yes BP7\HUNTL2
153
Determination Cause Depressuring 1C CL forwork
Action Taken Depressuring of 1C complete
Daily Volume (MSCF)
153
17-295 Controlled Blowdo 07/25/2017 1:25:00 am 1:42:00 am 17 min No No
Yes BP1\HUNTL2
95
Determination Cause Depressuring 1D CL for upcoming work
Action Taken Completed depressuring of 1 D CL
17-295 Controlled Blowdown 07/25/2017 3:22:00 pm 4:25:00 pm 63 min No No
Yes BP1\NOBLC4
253
Determination Cause Depressurize 2B / 2D / 2E / 5E for un blinding of 2C C/L
Action Taken Completed depressurization of C/L's 2B / 2D / 2E / 5E
Generated 08/15/2017 1:28:23PM
Page 8 of 15
Flare Start Date 07101/2017
Flare End Date 07/31/2017
17-302 Controlled Biowdown 07/29/2017 7:25:00 pm 10:45:00 pm 200 min No
Determination Cause Depressudng 12B and 12C common lines for make piggable project.
Action Taken Finished with depressure
No Yes BP1\OTTOKL 818
Daily Volume (MSCF) 1401
Total Volume (MSCF) 32531
Generated 08/15/2017 1:28:23PM Page 9 of 15
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, August 25, 2017 3:31 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; AK,
OPS FS1 Facility OTL; AK, OPS FS1 OSM; Glover, Robin; Buckbee, Rachel A; Starck,
Jennifer L; Bessler, Mark
Subject: Flaring Events at FS1
Follow Up Flag: Follow up
Flag Status: Flagged
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. report) ng(c)alaska. qo
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 07/29/2017 19:25 and stopping at 07/29/2017 22:45 with a volume of 818
(MSCF). The event lasted for 200 minutes and was due to depressurizing 12B and 12C commonlines for the Make
Piggable project work. The event stopped when depressurization was complete.
A flaring event occurred at FS1 starting at 08/09/2017 13:15 and stopping at 08/09/2017 14:00 with a volume of 12500
(MSCF) and was due to high transit gas pressure caused by a CGF compressor shutdown. The event stopped when rate
was cut and the CGF compressor was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
lennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROn11CFn rAS ni-qpnciTinti
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator ... •
BP
5. Monthlyear of Disposition
Au ust-2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name PoolCode Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
B. Flared or vented 1 hour or less
12,626
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
22,452
11, Assist Gas
61,954
12. Fuel gas used in lease operations.
429,088
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
526,120
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
143,938
Commissioner Date
18. Transferred to: (Express as a negative #) CGF 8 CCP
-62,214,571
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knoviledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
�/
Printed Name Diane ColleyPhone (907) 564-5775 Dateq//I I temperature of 60o F. Authority 20 A
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
August 2017
junplanneo events less than or equal to 1 hour
0
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/9/2017 1315-1400
12,500
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
TOTAL
12,500
8/21/2017 1700-1710
Unplanned events greater than 1 hour
8/31/2017 0300-0330
81
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Planned events greater than 1 hour
See attachments
See attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/21/2017 1430-1440
15 See attachments
See attachments
8/21/2017 1455-1505
15
8/21/2017 1700-1710
15
8/31/2017 0300-0330
81
TOTAL
126
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
12,500
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
126
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
22,452
Assist
61,954
TOTAL FLARED VOLUME
97,032
Page 3
9/14/2017
4:31 PM
Flare StartDate 08/01/2017
Flare End Date 08/31/2017
FS1 Flare Report Total Volume (MSCF) 12626
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-339 Other 08/21/2017 2:30:00 pm 2:40:00 pm 10 min No Yes Yes BPI \NOBLC4 15
Determination Cause Attempted to start 1803 LIPS compressor - Starting copus vents to STV flare. Black smoke because of liquids being trapped in the low
point on the STV flare candles.
Action Taken Attempted start was shut down due to copus starter not disengaging
17-339 Other 08/21/2017 2:55:00 pm 3:05:00 pm 10 min No No Yes BPI\NOBLC4 15
Determination Cause -RC 1803 attempt to start#2- Copus starting motor vents to STV flare
Action Taken Compressor did not start
17-339 Other 08/21/2017 5:00:00 pm 5:10:00 pm 10 min No No Yes BP1 W OBLC4 15
Determination Cause T\C 1803 Startup- Copus starting motorvents to STVflare
Action Taken Compressor started
Daily Volume (MSCF)
17-351 Controlled Blowdown 08/31/2017 3:00:00 am 3:30:00 am 30 min No No Yes BPI\BELLZO
Determination Cause Shut down and depressurized 1D common line. We need to remove blind in 12C common line and 1D purge divert leaks.
Action Taken Blocked in Flare once 1D common line was depressurized
Daily Volume (MSCF)
45
81
81
Total Volume (MSCF) 12626
Generated 09/06/2017 4:06:25PM Page 4 of 11
Link, Liz M (DOA)
From:
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Friday, August 25, 2017 3:31 PM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; AK,
OPS FS1 Facility OTL, AK, OPS FS1 OSM; Glover, Robin; Buckbee, Rachel A; Starck,
Jennifer L; Bessler, Mark
Subject:
Flaring Events at FS1
Follow Up Flag: Follow up
Flag Status: Flagged
To: AOGCC Reporting CC
aogcc.reporting(a alaska.gov
Victoria Loepp, AOGCC
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 07/29/2017 19:25 and stopping at 07/29/2017 22:45 with a volume of 818
(MSCF). The event lasted for 200 minutes and was due to depressurizing 12B and 12C commonlines for the Make
Piggable project work. The event stopped when depressurization was complete.
A flaring event occurred at FS1 starting at 08/09/2017 13:15 and stopping at 08/09/2017 14:00 with a volume of 12500
(MSCF) and was due to high transit gas pressure caused by a CGF compressor shutdown. The event stopped when rate
was cut and the CGF compressor was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer. blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROnLICFn c,nS n1cpnc1T1nti
1. Facility Number 2. Facility Name
0290000028 PB FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Month/year of Disposition
BP Se tember-2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7, Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
113
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
21,884
11. Assist Gas
59,359
12. Fuel gas used in lease operations.
572,575
13. Other (see instructions)
p
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
653,931
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF
153,476
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-62,059,814
19. Remarks.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
6 � Note: All volumes must be corrected
Signature_ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/�J, temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / i AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
September 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
TOTAL
9/24/2017 0110-0205
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
0
113 See attachments
113
See attachments
0
TOTAL
0
0
113
0
21,884
59,359
81,356
See attachments
See attachments
ACTION TAKEN TO E
See attachments
Page 3
10/12/2017
2:33 PM
Flare Start Date 09/01/2017
Flare End Date 09/30/2017
FSI Flare Report Total Volume (MSCF) 113
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-382 Controlled Blowdown 09/24/2017 1:10:00 am 20500 am 55 min No No Yes BP1\LYLEPE 113
Determination Cause Shut down DS5 for Test Header spool and header valve replacement. This event depressured 5D, 5B and 5E Common Lines.
Action Taken Completed depressuring.
Daily Volume (MSCF) 113
Total Volume (MSCF) 113
Generated 10/02/2017 2:13:02PM Page 2 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY RFPnRT nF PPnni irCn fl- n0 n1c1nr%c+iTir..i
Farm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, October 31, 2017 8:28 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; AK,
OPS FS1 Facility OTL; AK, OPS FS1 OSM; Glover, Robin; Buckbee, Rachel A; Starck,
Jennifer L; Bessler, Mark
Subject: Flaring Events at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoocc. reporting (5)alaska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 10/27/2017 01:20 and stopping at 10/27/2017 04:37 with a volume of 1368
(MSCF). The event lasted for 197 minutes and was due to spin cooling 1803 turbine compressor for water wash.. The
event stopped when spin cooling was completed.
A flaring event occurred at FS1 starting at 10/28/2017 21:50 and stopping at 10/28/2017 23:59 with a volume of 896
(MSCF). The event lasted for 129 minutes) and was due to spin cooling 1804 turbine compressor for water wash.. The
event stopped when spin cooling was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.bla ke@bp.com
Flare Start Date 10/01/2017
10/27/2017 1:20:00 am
4:37:00 am 197 min No
Determination Cause
Flare End Date 10/31/2017
Action Taken
Completed spin cooling.
F51 Flare Report
Total Volume (MSCF)
7350
Report
T\C 1603 spin dry after water wash
Action Taken
Numbs System Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
17-399 Controlled Blowdown 10/19/2017 11:49:00 pm
11:59:00 pm 10 min No
No Yes BP1\NOBLC4
284
Determination Cause Depressurize CHP from 400psi to 3psi in order to replace spool piece DS of L14
Completed attempted start
Action Taken CHP depressurized
Daily Volume (MSCF)
284
17-414 Other
10/27/2017 1:20:00 am
4:37:00 am 197 min No
Determination Cause
T\C 1803 spin cooling
Action Taken
Completed spin cooling.
17-414 Other
10/27/2017 5:00:00 pm
6:00:00 pm 60 min No
Determination Cause
T\C 1603 spin dry after water wash
Action Taken
Completed spin dry
17-414 Other
10/27/2017 9:30:00 pm
9:40:00 pm 10 min No
Determination Cause
TIC 1803 Attempted start
Action Taken
Completed attempted start
No Yes BPI\NOBLC4 1368
No Yes BPIWOBLC4 21
No Yes BP1\NOBLC4 69
17-414 Other 10/27/2017 9:50:00 pm 10:00:00 pm 10 min No No Yes BPI\NOBLC4 69
Determination Cause T\C 1803 Attempted start#2
Action Taken Completed start attempt #2
Daily Volume (MSCF) 1527
17-415 Other 10/28/2017 9:50:00 pm 11:59:00 pm 129 min No No Yes BP1\NOBLC4 896
Determination Cause T\C 1804 spin cooling
Action Taken Completed spin cooling.
17-416 Other 10/29/2017 12:00:00 am 12:50:00 am 50 min No
Determination Cause T\C 1804 spin cooling
Action Taken Completed spin cooling.
Daily Volume (MSCF) 896
No Yes BPI\NOBLG4 347
Daily Volume (MSCF) 347
Total Volume (MSCF) 7360
Generated 11/03/2017 1:17:48PM Page 5 of 8
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
October 2017
junplanneo events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/22-23/2017 2351-0027 4,306 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 4,306
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/19/2017 2349-2359 284 See attachments See attachments
10/27/2017 1700-1800 21
10/27/2017 2130-2140 69
10/27/2017 2150-2200 69
TOTAL 443
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
10/27/2017 0120-0437
1,368 See attachments
10/28-29/17 2150-0050
1,243
TOTAL
2,611
TOTAL
Unplanned Events < 1 Hour
4,306
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
443
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
2,611
25,734
64,409
97,503
See attachments
Page 4
11/13/2017
9:27 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. Monthfyear of Disposition
I November -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
p
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
34,486
10. Pilot and Purge
22,172
11. Assist Gas
55,023
12. Fuel gas used in lease operations.
580,284
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
�rj 3/16(15
Safety
� J y 96 MCF
l f
14. TOTAL VOLUME (ITEMS 6-12)
691,965
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
0
Waste
MCF
17. Transferred from: CGF
161,381
3 /C` AQ
lie(
18. Transferred to: (Express as a negative #) CGF &CCP
-64,237,385
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
l/�//y�,Q�� Note: All volumes must be corrected
Signature `� �"="��l Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date ��'
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
November 2017
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
..,z
I Irvin
VULUIVIt UESCKIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
11/16/2017
0905-1027
7,972 See attachments
See attachments
11/16/2017
1200-1430
26,042
11/30/2017
1450-1610
472
TOTAL
34,486
Planned events less than or equal to 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
0
TOTAL
0
34,486
0
0
22,172
55,023
111,681
See attachments
Page 3
12/13/2017
9:07 AM
Flare StartDate 11/01/2017
Flare End Date 11/30/2017
FS1 Flare Report Total Volume (MSCF) 14486
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volu •e
17-429 Flare Relief 11/16/2017 9:05:00 am 10:27:00 am 82 min No No No BPI\OTTOKL 7972
Determination Cause LPS T\C 1804 shutdown because of a problem associated with Fire and Gas cutovers.
Action Taken Shut in wells, DS18-4,3. DSS -23,11,21. DS2-22,8,7,15.
17-429 Flare Relief 11/16/2017 12:00:00 pm 2:30:00 pm 150 min No No No BP1\OTTOKL 26042
Determination Cause LPS T\C 1803 shutdown because of a problem associated with wires crossed on ere and gas s/d trip.
Action Taken 1603 T/C restarted.
Daily Volume (MSCF) 34014
17-433 Flare Relief 11/30/2017 2:50:00 pm 4:10:00 pm 80 min No No No BP1\OTTOKL 472
Determination Cause STV -IP -RC 1825 down to idle for Fire & Gas cutover in that module.
Action Taken Loaded STV/IP T/C.
Daily Volume (MSCF) 472
Total Volume (MSCF) 34486
Generated 12/06/2017 9:22:30AM Page 3 of 6
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, December 18, 2017 2:21 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; AK,
OPS FS1 Facility OTL; AK, OPS FS1 OSM; Glover, Robin; Buckbee, Rachel A; Starck,
Jennifer L, Bessler, Mark
Subject: Flaring Events at FS1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reporting (a)alaska.gov
From: Jennifer Blake, GPB Production Team Leader
A flaring event occurred at FS1 starting at 11/16/2017 09:05 and stopping at 11/16/2017 10:27 with a volume of 7972
(MSCF). The event lasted for 82 minutes and was due to a LPS Turbine Compressor 1804 shutdown caused by a
problem associated with the Fire and Gas cutovers. The event stopped when spin production rate was cut.
A flaring event occurred at FS1 starting at 11/16/2017 12:00 and stopping at 11/16/2017 14:30 with a volume of 26042
(MSCF). The event lasted for 150 minutes and was due to a LPS T\C 1803 shutdown caused by a problem associated
with wires crossed on the fire and gas s/d trip. The event stopped when TIC 1803 was restarted.
A flaring event occurred at FS1 starting at 11/30/2017 14:50 and stopping at 11/30/2017 16:10 with a volume of 472
(MSCF). The event lasted for 80 minutes and was due to ramping down STV -IP T\C 1825 to idle for Fire & Gas cutover in
that module. The event stopped when the T/C was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I December -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
1,625
10. Pilot and Purge
22,710
11. Assist Gas
56,418
12. Fuel gas used in lease operations.
617,174
13. Other (see instructions)
O
Official Use Only
Authorization >1 hr:
b !4
�j(l �a
�/ �
Safety
Ify 6 �)
MCF
14. TOTAL VOLUME (ITEMS 6-12)
697,927
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
163,755
// 3 _ /� _/
Commissioner 7-�r�--- Date
18. Transferred to: (Express as a negative # CGF & CCP
( p g )
-77,538,151
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�� Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska t0 pressure of 14.65 psia and to a
Printed Name Diane ColleyPhone (907) 564-5775 Date temperature of 60o F. Authority 20
/ / �>
_) SAAr9.5 91
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING AND VENTING INCIDENT REPORT
December 2017
events less than oreaualto
Page 4
1/12/2018
9:58 AM
Not required for events <= 1 hr
Not required for events <= 1 hr
TOTAL
0
Unplanned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/21/2017 0630-1300
1,625
See attachments
See attachments
TOTAL
1,625
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr
Not required for events <= 1 hr
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
1,625
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
22,710
Assist
56,418
TOTAL FLARED VOLUME
80,753
Page 4
1/12/2018
9:58 AM
Flare Start Date 12/01/2017
Flare End Date 12/31/2017
FS1 Flare Report Total Volume (MSCF)
Report
Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-456 Flare Relief 12/21/2017 6:30:00 am 1:00:00 pm 390 min No No No BP1\MCCADJ 1625
Determination Cause STV-IP TRC 1825 shutdown due to a problem associated with the ASD Drive And Transmitter.
Action Taken Loaded STV/IP T/C. Electricians trouble shot ASD and 1825 was re started and loaded.
Total Volume (MSCF)
Generated 01/08/2018 10:33:46AM Page 4 of 9