STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PB FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Monthlyear of Disposition
Janua -2017
DispositionVolume
MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
T Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
255
9. Flared or vented more than 1 hour (see instr.)
3,450
10. Pilot and Purge
13,617
11. Assist Gas
568
12. Fuel gas used in lease operations.
742,093
13. Other (see instructions)
Official Use Only
Authorization >11 hr:
Safety
5-0MCF
14. TOTAL VOLUME (ITEMS 6-12)
759,983
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
285,188
n
2 (Z4 '1
/ Commissioner—t•`-- J Date
18. Transferred to: (Express as a negative #) CGF
-20,347,236
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature i k Li'l 1 N(�G I Title Manager Production Taxes and Royalties Alaska cite: All volumes must be correctedto pressure of 14.65 psia and to a
/ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date - i AAC25.235.
Vr1
3/24/!
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
See attachments
TOTAL 0
See attachments
TOTAL 0
BP EXPLORATION (ALASKA) INC.
Unplanned Events < 1 Hour
255
PRUDHOE BAY UNIT - FS -2
3,450
Planned Events < 1 hour and not
GAS FLARING INCIDENT REPORT
exceeding 5,000 MCF
January 2017
0
Unplanned events less than or equal to 1 hour
Pilot Purge
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
1/23/2017 1826-1906 189
Not required for unplanned events <= 1 hr
Not required for Unplanned events <=1 hr
1/25/2017 1712-1724 66
TOTAL 255
Unplanned events greater than 1 hour
DATE TIME VOLUME
1/9/2017
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
0950-1115 3,450
See attachments
See attachments
TOTAL 3,450
Planned events less than or equal to 1 hour
See attachments
TOTAL 0
See attachments
TOTAL 0
See attachments
See attachments
Page 4
2/12/2017
5:13 PM
TOTAL
Unplanned Events < 1 Hour
255
Unplanned Events> 1 Hour
3,450
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
13,617
Assist
568
TOTAL FLARED VOLUME
17,890
See attachments
See attachments
Page 4
2/12/2017
5:13 PM
Flare StartDate 01/01/2017
Flare End Date 01/31/2017
FS2 Flare Report
Total Volume (MSCF) 3705
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-18 Flare Relief 01/09/2017 9'.50.00 am 11:15:00 am 85 min No No No BP1\RALPHJM 3450
Determination Cause Lost LPS Compressor 1803 on a false IR detection on the F&G System.
Action Taken Shut in 106 MMSCF/D production initially and an additional 42 MMSCF/D to get off Flare. Re -started compressor following cuts.
Daily Volume (MSCF) 3450
Total Volume (MSCF) 3705
02/02/2017 11:09.42AM
Page 4 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
volume MCF
4. Operator 5. Month/Vear of Disposition
BP Februa -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
707
10. Pilot and Purge
12,316
11, Assist Gas
14
12. Fuel gas used in lease operations.
688,943
13. Other (see instructions)
0
Official Use Onty
Authorization>t hr:
Safety
-7 0
MCF
14. TOTAL VOLUME (ITEMS 6-[2)
701,9$0
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
299,194
_ 5
18. Transferred to: (Express as a negative #) CGF
-20,062,595
Commissioner Date
19. Remarks:
I hereby certify that the foregoing ins true and correct to me best of my knowledge.
61 I% Note: All Volumes must he corrected
Signature LY
Title Manager Production Taxes and R alties Alaska to pressure of 14.65 psis and to a
Printed Name Diane Colley/��' '1 temperature of 600 F. Authority 20
Phone (907) 564-5775 Date / AAC25.235.
✓ T--
+/+-) L�--
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
events less than or equal to 1 hour
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
February 2017
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
2/4/2017 0300-2100
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
707 See attachments
707
TOTAL
0
0
0
707
12,316
14
13,037
ALHON TAKEN TO I
See attachments
Page 6
3/15/2017
10:10 AM
Flare Start Date 02/01/2017
Flare End Date 02128/2017
FS2 Flare Report
Total Volume (MSCF)
707
Report
Numbs System Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
17-38 Other 02/04/2017 3:00:00 am
9:00:00 pm 1080 min No
No Yes BP1\BOOKAP
707
Determination Cause 9A and 9E common lines shutdown for planned maintenance. Depressurized common lines for wont at drill site 9.
Action Taken Job was completed at DS-09.
Daily Volume (MSCF)
707
Total Volume (MSCF)
707
Generated 03/01/2017 3:11:04PM Page 6 of 9
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, February 07, 2017 7:48 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Bessler,
Mark; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL, Glover, Robin; Buckbee, Rachel
A; AK, OPS FS2 OSM; Fortenberry, Christopher
Subject: Flaring Event at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoccc.reoortinc(aa)alaska cov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 02/04/2017 03:00 and stopping at 02/04/2017 21:00 with a volume of 707
(MSCF). The event lasted for 1080 minutes and was due to depressurizing the 9A and 9E common lines for planned
maintenance. The event stopped the depressurization was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP March -2017
20. Forproduction from multiple pools, list contribution of each pool as a percent o/
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
263
9. Flared or vented more than 1 hour (see instr.)
16,815
10. Pilot and Purge
13,628
11. Assist Gas
22,350
12. Fuel gas used in lease operations.
734,962
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
�� 5-
MCF V
!
14. TOTAL VOLUME (ITEMS 6-12)
788,018
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
309,492
18. Transferred to: (Express as a negative #) CGF
-20,783,823
Commissioner Date
19. Remarks:
I hereby certify that /t11�e foregoing is true and correct to the best of my knowledge.
bum�-t ( ,Z / Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley )/ temperature of 60o F. Authority 20
Phone (907) 564-5775 Dale / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION IALASKAI INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
March 2017
unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT Si -CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/2/2017 2022-2030 39 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
3/4/2017 1309-1319 49
3/6/2017 2140-2216 175
TOTAL 263
Unplanned events greater than 1 hour
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE—CAUSE
3/7-9/17 0217-1100 16,815 See attachments See attachments
TOTAL 16,8
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
263
0
0
16,815
13,628
22,350
53,056
Page 5
4/13/2017
10:32 AM
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, March 16, 2017 2:01 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory, Schinagl, Werner; Bessler,
Mark, AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; Glover, Robin; Buckbee, Rachel
A; AK, OPS FS2 OSM; Fortenberry, Christopher
Subject: Flaring Events at FS2
Follow Up Flag: Follow up
Flag Status: Flagged
To: AOGCC Reporting CC:
aogcc. reporti nq C@alaska. qoy
Victoria Loepp, AOGCC
From: Jennifer Blake, GPB Production Optimization Team Leader
A multiple day flaring event occurred at FS2, starting on 3/7/2017 and ending on 3/9/2017. The flaring event was due to
planned maintenance, an engine swap, on STV -IP T/C 1801. A restart attempt was made on 3/8, however 1801's VGV's
were out of calibration. The event stopped when the swap was complete, the VGVs were recalibrated, and the STV -IP
T/C was reloaded. A summary of the event dates, volumes, and durations associated with T/C 1801's shutdown are noted
below.
• A flaring event occurred at FS2 starting at 03/07/2017 02:17 and stopping at 03/08/2017 with a volume of 6335
(MSCF). The event lasted for 1303 minutes.
• A flaring event occurred at FS2 starting at 03/08/2017 00:00 and stopping at 03/08/2017 23:59 with a volume of
7200 (MSCF). The event lasted for 1439 minutes.
• A flaring event occurred at FS2 starting at 03/09/2017 00:00 and stopping at 03/09/2017 11:00 with a volume of
3280 (MSCF). The event lasted for 660 minutes.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Flare Start Date 03/01/2017
Flare End Date 03/31/2017
FS1 Flare Report Total Volume (MSCF) 11535
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
W-93 Hare Relief 03/20/2017 3:52:00 am 11:59:00 pm 1207 min No No Yes BPIIBELLZO 7753
Determination Cause 1825 STV/1P Compressor shutdown for planned maintenance.
Action Taken 1825 STV/IP compressor loaded
Daily Volume (MSCF) 7753
17-92 Flare Relief 03/21/2017 12:00:00 am 12:25:00 am 25 min No No Yes BP1\BELLZO 161
Determination Cause 1825 SNIP Compressor shutdown for planned maintenance.
Action Taken Loaded 1825 SN/IP compressor
17-92 Flare Relief 03/21/2017 2:14:00 am 2:45.00 am 31 min No No Yes BPIIBELLZO 369
Determination Cause Depressurized C -HP separator and C -HP gas scrubber to flare to replace the L14V spool.
Action Taken Completed depressurizing.
Total Volume (MSCF) 11535
Generated 04/03/2017 4:36:08PM Page 4 of 7
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthiYear of Disposition
A ri1-2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
14,223
11, Assist Gas
740
12. Fuel gas used in lease operations.
714,787
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
729,7$0
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
311,521
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-19,564,770
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature_ , (a Note: All volumes must be corrected
Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley Phone (907) 564-5775 Date L 7 temperature F. Authority 2t7
AAC25.5.235.
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
April 2017
events less than or
- TIME
to 1 hour
Not required for unplanned events <= 1 hr
TOTAL p
Unplanned events Rreater than 1 hour
Not required for unplanned events <= 1 hr
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
0
TOTAL
0
0
0
0
14,223
740
14,963
See attachments
See attachments
See attachments
See attachments
Page 5
5/14/2017
2:06 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROrnurFn rec n1cone1T1nki
1. Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP Ma -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7, Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
U
9. Flared or vented more than 1 hour (see instr.)
1,918
10. Pilot and Purge
13,539
11. Assist Gas
2,220
12. Fuel gas used in lease operations.
717,400
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
/ �f g
/
MC,1 i^
i4 f J
14. TOTAL VOLUME (ITEMS 6-12)
735,077
15. NGL Gas Equivalent
U
Lease Use
MCF
16. Purchased gas
Conservation
MCFU
Waste:
MCF
17. Transferred from: CGF
314,996
1
11 ZP
7.20-�
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-20,433,124
19. Remarks:
I hereby certify that the foregoing is trueand correct to the best of my knowledge.
Signature_ 016x, ( Note: All volumes must be corrected
Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley /. )]� temperature of 600 F. Authority 20
Phone (907) 564-5775 Date lP l AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
May 2017
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
0
0
0
1,915
13,539
2,220
17,677
Page 4
6/14/2017
1:58 PM
See attachments
See attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/5/2017 2233-2359
431
See attachments
See attachments
5/6/2017 0555-1615
1,056
5/9/2017 0040-0222
431
TOTAL
1918
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
0
0
0
1,915
13,539
2,220
17,677
Page 4
6/14/2017
1:58 PM
Flare Start Date 05/01/2017
Flare End Date 05/3112017
FS2 Flare Report Total Volume (MSCF) 1918
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-142 Flare Relief 05/05/2017 10:33:OOpm 11:59:OOpm 86min No No Yes BP1\MITCHEB 431
Determination Cause TC 1803 spin cooling
Action Taken Completed spin cooling.
Daily Volume (MSCF) 431
17-145 Flare Relief 05/06/2017 5:55:00 am 4:15:00 pm 620 min No
Determination Cause DS -09 A and E common lines shutdown for planned maintenance
Action Taken Completed depressunng. All work was completed at the DS.
17-155 Flare Relief 05/09/2017 12:40:00 am 2:22:00 am 102 min No
Determination Cause 'RC 1804 spin cooling
Action Taken Completed spin cooling.
No Yes BP1\BOOKAP 1056
No
Daily Volume (MSCF) 1056
Daily Volume (MSCF) 431
Total Volume (MSCF) 1918
Generated 06/09/2017 2:22:08PM Page 4 of 9
Link, Liz M (DOA)
From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, May 18, 2017 11:04 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Bessler,
Mark; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; Glover, Robin; Buckbee, Rachel
A; AK, OPS FS2 OSM; Bosmans, Wendy L; Dean, James A
Subject: Flaring Events at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reportingc()alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 05/05/2017 22:33 and stopping at 05/05/2017 23:59 with a volume of 431
(MSCF). The event lasted for 86 minutes and was due to spin cooling T/C 1803 for planned maintenance. The event
stopped the spin cooling was completed.
A flaring event occurred at FS2 starting at 05/06/2017 05:55 and stopping at 05/06/2017 16:15 with a volume of 1056
(MSCF). The event lasted for 620 minutes and was due to depressurizing DS09 Common line A and E for planned
maintenance. The event stopped when depressurization was completed.
A flaring event occurred at FS2 starting at 05/09/2017 00:40 and stopping at 05/09/2017 02:22 with a volume of 431
(MSCF). The event lasted for 102 minutes and was due to spin cooling T/C 1804 for planned maintenance. The event
stopped the spin cooling was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake(@bp.com
Flare Start Date 05/01/2017
Flare End Date 05/31/2017
FS2 Flare Report Total Volume (MSCF) 1918
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-142 Flare Relief 05/05/2017 10:33:00 pm 11:59:00 pm 86 min No
Determination Cause
TC 1803 spin cooling
Action Taken
Completed spin cooling.
17-145 Flare Relief 05/06/2017 5:55:00 am 4:15:00 pm 620 min No
Determination Cause
DS -09 A and E common lines shutdown for planned maintenance
Action Taken
Completed depressudng. All work was completed at the DS.
17-155 Flare Relief
05/09/2017 12:40:00 am 2:22:00 am 102 min No
Determination Cause
-RC 1804 spin cooling
Action Taken
Completed spin cooling.
No Yes BP1\MITCHEB 431
Daily Volume (MSCF) 431
No Yes BPt\BOOKAP 1056
Daily Volume (MSCF) 1056
No Yes BP1\MITCHEB 431
Daily Volume (MSCF) 431
Total Volume (MSCF) 1918
Generated 06/09/2017 2:22:08PM Page 4 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP IIIJune-2017
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
279
9. Flared or vented more than 1 hour (see instr.)
17,569
10. Pilot and Purge
12,952
11. Assist Gas
20,322
12. Fuel gas used in lease operations.
684,156
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
��5� 9
MCF
74. TOTAL VOLUME (ITEMS 8-12)
735,278
Lease Use
MCF
15. NGL Gas Equivalent
0
Conserva8on
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
293,048
P— / —/7 /7
/
18. Transferred to: (Express as a negative #) CGF
-22,336,761
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
6141hif � Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/ temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date d AAC25.235.
YTL
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
June 2017
Lplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/4/2017 0824-0915 279 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 279
Unplanned events greater than 1 hour
TOTAL
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/23/2017 1012-1330
413 See attachments
See attachments
6/23/2017 1330-2125
2,474
Planned Events > 1 hour or
TOTAL
2,887
Pilot Purge
12,952
Planned events less than or equal to 1 hour
20,322
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/1/2017 0917-1346
1,403 See attachments
See attachments
6/2-3/2017 0430-2200
12,987
6/3/2017 0507-1350
292
TOTAL
14,682
Page 5
7/18/2017
11:37 AM
TOTAL
Unplanned Events < 1 Hour
279
Unplanned Events> 1 Hour
2,887
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
14,682
exceeding 5,000 MCF
Pilot Purge
12,952
Assist
20,322
TOTAL FLARED VOLUME
51,122
Page 5
7/18/2017
11:37 AM
Flare Start Date 06/01/2017
Flare End Date 06/30/2017
FS2 Flare Report
Total Volume (MSCF) 17848
Report
Numbe System
Date Start Time Stop Time Duration Intermittent
Black Smoke
Planned
Reported By
Volume
17-189 Flare Relief 06/01/2017 9:17.00am 1:46:00 pm 269 min No
No
Yes
BP1Vu11TCHEB
1403
Determination Cause
STV -IP T\C 1801 unloaded due to planned maintenance. Had to extend idle time due to high FSIM pressure.
Action Taken
Loaded STV/IP T/C.
Daily Volume (MSCF)
1403
17-190 Flare Relief 06/02/2017 4:30:00 am 11:59:00 pm 1169 min No
No
Yes
BP1\BOOKAP
6102
Determination Cause
STV -IP T\C 1801 shut down for 2000 Hour Bono -Scope and other Maintenance.
Action Taken
Still on Flare.
Daily Volume (MSCF)
6102
17-192 Controlled Blowdown 06/03/2017 12:01:00 am 10:00:00 pm 1319 min No
No
Yes
BP1\BOOKAP
6885
Determination Cause
STV -IP T\C 1801 shutdown due to 2000 hour borescope
Action Taken
2000 hour inspection completed
17-192 Controlled Blowdown 06/03/2017 50700 am 1:50:00 pm 523 min No
No
Yes
BP1\BOOKAP
292
Determination Cause
Depressured 4 Band 4 C common lines for DS maintenance
Action Taken
Completed depressunng of 4B and 4 C common lines
17-218 Flare Relief 06/23/2017 10:12:00 am 1:30:00 pm 198 min No No
Determination Cause Lost 1801 T/C due to main power grid failure.
Action Taken Sit Plant.
17-218 Flare Relief 06/23/2017 1:30:00 pm 9:25:00 pm 475 min No No
Determination Cause Restart of plant, continue trouble shoot of 1801 T/C.
Action Taken Repaired STV pressurizing valve switch, re -started 1801 T/C and put online.
Daily Volume (MSCF) 7177
No BP1\RALPHJM 413
No BP1\RALPHJM 2474
Daily Volume (MSCF) 2887
Total Volume (MSCF) 17848
Generated 07/06/2017 2:44:22PM Page 5 of 10
Link, Liz M (DOA)
From: Blake, Jennifer J <Jennifer.Blake@bp.com>
Sent: Wednesday, June 14, 2017 8:26 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Dean, James A; Bessler, Mark;
AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; Glover, Robin; Buckbee, Rachel A; AK,
OPS FS2 OSM; Fortenberry, Christopher
Subject: Flaring Event at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc rei)orting@alaska gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/01/2017 09:17 and stopping at 06/01/2017 13:46 with a volume of 1403
(MSCF). The event lasted for 269 minutes and was due to planned maintenance on STV/IP compressor 1801.. The event
stopped 1801 was reloaded.
A flaring event occurred at FS2 starting at 06/02/2017 04:30 and stopping at 06/02/2017 23:59 with a volume of 6102
(MSCF). The event lasted for 1169 minutes and was due to a planned 2000 hour boro-scope on STV -IP compressor
1801. The event continued into the next day, 6/3/2017.
A flaring event occurred at FS2 starting at 06/03/2017 00:01 and stopping at 06/03/2017 22:00 with a volume of 6885
(MSCF). The event lasted for 1319 minutes and was a continuation of the planned 2000 hour boro-scope on STV -IP
compressor 1801. The event stopped when the inspection was complete and the compressor was reloaded.
A flaring event occurred at FS2 starting at 06/03/2017 05:07 and stopping at 06/03/2017 13:50 with a volume of 292
(MSCF). The event lasted for 523 minutes and was due to depressurization of the 4B and 4C common lines for planned
drill site 4 maintenance. The event stopped when depressurization was complete.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jennifer.blake@bo.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, July 3, 2017 10:57 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson,.Gary A; Arthur, Gregory; Starck, Jennifer L; Ressler,
Mark; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; Glover, Robin; Buckbee, Rachel
A; AK, OPS FS2 OSM; Fortenberry, Christopher
Subject: Flaring Event at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc reporting(cbalaska gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/23/2017 10:12 and stopping at 06/23/2017 13:30 with a volume of 413
(MSCF). The event lasted for 198 minutes and was due to the CPS power outage causing T/C 1801 to trip offline. The
event stopped when rate to the plant ceased (was isolated).
A flaring event occurred at FS2 starting at 06/23/2017 13:30 and stopping at 06/23/2017 21:25 with a volume of 2474
(MSCF). The event lasted for 475 minutes and was due to troubleshooting T/C 1801 after restart of the plant. The event
stopped when the STV pressurizing valve switch was repaired and T/C 1801 was loaded.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRnnl ICFn r.ec nicpnc1r1nK1
---- --
1. Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
---------
3. Field
PBU - EOA
Volume MCF
---.. r.v• vvl I1v..
4. Operator 5. MonthNear of Disposition
BP Jul, -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
394
9. Flared or vented more than 1 hour (see instr.)
15,640
10. Pilot and Purge
13,516
11. Assist Gas
15,436
12. Fuel gas used in lease operations.
552,072
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
MCF VT
14. TOTAL VOLUME (ITEMS 6-12)
597,058
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
238,440
ff—� —1
Commissioner Dale
18. Transferred to: (Express as a negative #) CGF
-17,613,041
19. Remarks:
I hereby certify that he foregoing is true and correct to the best of my knowledge.
0�u�� Note: All volumes must be corrected
Signature Title Mana er Production Taxes nd o alties Alaska t0 pressure of 14.65 psis and to a
Printed Name Diane Colle g �H j temperature of 60o F. Authority 20
Phone (907) 564-5775 Date
/-7
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
July 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/4/2017 1445-1506 114 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
7/6/2017 1324-1347 125
7/8/2017 1645-1657 120
7/21/2017 1457-1510 35
TOTAL 394
or equal to 1 hour
See attachments
TOTAL 0
7/29/2017 0000-1120 10,845 See attachments
TOTAL 10,845
See attachments
See attachments
See attachments
Page 6
8/13/2017
3:49 PM
nrv¢
VOLUME DESCRIPTION OF IN
7/6/2017
0932-1101
482 See attachments
7/6/2017
1116-1233
417
7/6/2017
1540-1700
433
7/6-7/2017
2140-0355
1,920
7/14/2017
1915-2047
447
7/21/2017
1112-1238
360
7/23/2017
0805-1104
446
7/23/2017
0822-1101
260
7/28/2017
1530-2359
30
TOTAL
4,795
or equal to 1 hour
See attachments
TOTAL 0
7/29/2017 0000-1120 10,845 See attachments
TOTAL 10,845
See attachments
See attachments
See attachments
Page 6
8/13/2017
3:49 PM
BP EXPLORATION (ALASKA) INC. Page 7
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
July 2017
8/13/2017
3:49 PM
TOTAL
Unplanned Events < 1 Hour
394
Unplanned Events> 1 Hour
4,795
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
10,845
exceeding 5,000 MCF
Pilot Purge
13,516
Assist
15,436
TOTAL FLARED VOLUME
44,986
BP EXPLORATION (ALASKA) INC. Page 7
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
July 2017
8/13/2017
3:49 PM
Link, Liz M (DOA)
From: Blake, Jennifer! <Jennifer.Blake@bp.com>
Sent: Wednesday, July 26, 2017 4:16 PM
To: AKOpsProdEOCTL; AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Bessler,
Mark, AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; Glover, Robin; Buckbee, Rachel
A; AK, OPS FS2 OSM; Fortenberry, Christopher
Subject: Flaring Event at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reporting (a)alaska. clov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 07/06/2017 09:32 and stopping at 07/06/2017 11:01 with a volume of 482
(MSCF). The event lasted for 89 minutes and was due to the STWIP T/C.unloading due to high temperature. The event
stopped when rates were cut and the STWIP was reloaded.
A flaring event occurred at FS2 starting at 07/06/2017 11:16 and stopping at 07/06/2017 12:33 with a volume of 417
(MSCF). The event lasted for 77 minutes and was due to the STWIP T/C unloading due to high temperature. The event
stopped when the STV/IP was reloaded.
A flaring event occurred at FS2 starting at 07/06/2017 15:40 and stopping at 07/06/2017 17:00 with a volume of 433
(MSCF). The event lasted for 80 minutes and was due to the STWIP T/C unloading due to temperature. The event
stopped when the plant was shut down because of a power outage shutting down CGF.
A flaring event occurred at FS2 starting at 07/06/2017 21:40 and continuing on into 07/07/2017 with a volume of 649
(MSCF) for 07/06. The event lasted for 139 minutes and was due to a STV -IP T\C 1801 shutdown resulting from a
problem associated with CGF power failure. The event is ongoing into 07/07/2017 until the STWIP can reload.
A flaring event occurred at FS2 continuing from the previous day and stopping at 07/07/2017 03:55 with a volume of 1271
(MSCF) for 07/07. The event lasted for 235 minutes and was due to a STV -IP T\C 1801 shutdown resulting from a
problem associated with CGF power failure. The event stopped when the STV/IP was reloaded.
A flaring event occurred at FS2 starting at 07/14/2017 19:15 and stopping at 07/14/2017 20:47 with a volume of 447
(MSCF). The event lasted for 92 minutes and was due to high temperature. The event stopped when the STV/IP was
reloaded.
A flaring event occurred at FS2 starting at 07/21/2017 11:12 and stopping at 07/21/2017 12:38 with a volume of 360
(MSCF). The event lasted for 86 minutes and was due to depressurizing commonline 17D for drill site manifold work. The
event stopped when depressurization was completed.
A flaring event occurred at FS2 starting at 07/23/2017 08:05 and stopping at 07/23/2017 11:04 with a volume of 446
(MSCF). The event lasted for 179 minutes and was due to depressurizing commonline 16D for maintenance. The event
stopped when depressurization was completed.
A flaring event occurred at FS2 starting at 07/23/2017 08:22 and stopping at 07/23/2017 11:01 with a volume of 260
(MSCF). The event lasted for 159 minutes and was due to depressurizing B -Gas Conditioning Train for S/D. The event
stopped when depressurization was completed.
Thanks,
Flare Start Date 07/01/2017
Flare End Date 07/31/2017
FS2 Flare Report Total Volume (MSCF) 16034
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-251 Flare Relief 07/06/2017 9:32:00 am 11:0100 am 89 min
Yes No
No BP1\FOISNL
482
Determination Cause STV -IP T\C XXXX unloaded due to temperature.
Action Taken Loaded STV/IP T/C and shut in wells
17-251 Flare Relief 07/06/2017 11:16:00 am 12:33:00 pm 77 min
Yes No
No BP1\FOISNL
417
Determination Cause STV -IP -RC XXXX unloaded due to temperature.
Action Taken Loaded STV/IP TIC.
17-251 Flare Relief 07/06/2017 3:40:00 pm 5:00:00 pm 80 min
No No
No BP7\REIMBT
433
Determination Cause STV -IP TIC 1801 unloaded due to temperature.
Action Taken Shutdown the plant because CGF went down
17-251 Flare Relief 07/06/2017 9:40:00 pm 11:59:00 pm 139 min
No No
No BP1\MITCHEB
649
Determination Cause STV -IP T\C 1801 shutdown due to a problem associated with
CGF power failure
Action Taken Flare is ongoing until 1801 STV/IP compressor is loaded
Daily Volume (MSCF)
2106
17-255 Flare Relief 07/07/2017 12:00:00 am 3:55:00 am 235 min
No No
No BPI\MITCHEB
1271
Determination Cause STV-IP'RC 1801 shutdown due to a problem associated with
CGF powerfailum
Action Taken Loaded STV/IP T/C.
Daily Volume (MSCF)
1271
17-269 Controlled Slowdown 07/14/2017 7:15:00 pm 8:47:00 pm 92 min
No No
No BPI\BARKERJ
447
Determination Cause high ambient temps, would not compress
Action Taken cooled down enough to run
Daily Volume (MSCF)
447
17-285 Controlled Blowdown 07/21/2017 11:12:00 am 12:38:00 pm 88 min
No No
No BPI\RALPHJM
360
Determination Cause Depressure C/L 17D for DS manifold work.
Action Taken Complete depressuring.
17-289 Controlled Blowdown 07/23/2017 8:05:00 am 11:04:00 am 179 min
No No
No BP1\RALPHJM
446
Generated 08/15/2017 1:28:23PM
Page 10 of 15
Flare Start Date 07/01/2017
Flare End Date 07/31/2017
Determination Cause De -pressure 16D C/L for maintenance
Action Taken Complete de -pressuring.
17-289 Controlled Blowdown 07/23/2017 6:22:00 am 11:01:00 am 159 min Yes No No BPI\RALPHJM
260
Determination Cause
De -pressure B -Gas Conditioning Train for S/D, 0822-0914 hrs and 1010-1101 furs (103 mins total).
Action Taken
Complete de -pressuring.
Daily Volume (MSCF)
706
17-300 Controlled Blowdown 07/28/2017 3:30:00 pm 11:59:00 pm 509 min No No No BPI\WOLCJO
30
Determination Cause
De -pressured treater flash drums and treaters, shut down 1801 and lowered COSD pressure to float COSD on flare for STV gas
leakby.
Action Taken
Completed de -pressuring.
Daily Volume (MSCF)
30
17-304 Controlled Blowdown 07/29/2017 12:00:00 am 11:20:00 am 680 min No No Yes BPi\REIMBT
10845
Determination Cause
DE -pressured FS2 area for 2017 TAR. Plant, DnII Sites, Artificial Lift, and MI Gas.
Action Taken
Completed de -pressuring.
Total Volume (MSCF)
16034
Generated 08/15/2017 1:28:23PM Page 11 of 15
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, August 25, 2017 2:46 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Bessler,
Mark; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; Glover, Robin; Buckbee, Rachel
A; AK, OPS FS2 OSM
Subject: Flaring Events at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reporting (a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 07/28/2017 15:30 and carrying on into 07/29/2017 with a volume of 30
(MSCF) on 07/28/2017. The event on 07/28/2017 lasted for 509 minutes and was due to depressurizing the FS2
Area for 2017 TAR. This includes plant, Drill Sites, Artificial Lift, and MI gas. The event carried on into the following day.
A flaring event occurred at FS2, continuing from the day before and stopping at 07/29/2017 11:20 with a volume of
10845 (MSCF) on 07/29/2017. The event lasted for 680 minutes on 07/29/2017 and was due to depressurizing for
the 2017 TAR. The event stopped when depressurization was completed.
A flaring event occurred at FS2 starting at 08/05/2017 13:26 and stopping at 08/05/2017 22:20 with a volume of
1113 (MSCF). The event lasted for 534 minutes and was due to restarting the facility and 1801 T/C unable to get a
bite for compression at low plant rates. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/06/2017 00:01 and stopping at 08/06/2017 0 1: 10 with a volume of
192 (MSCF). The event lasted for 69 minutes and was due to 1801 T/C losing bite for compression at low plant
rates. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/06/2017 04:52 and stopping at 08/06/2017 14:52 with a volume of
1667 (MSCF). The event lasted for 600 minutes and was due to 1801 T/C losing bite for compression at low plant
rates. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/06/2017 16:06 and carrying on into 08/07/2017 with a volume of
1317 (MSCF) on 08/06/2017. The event lasted for 474 minutes on 08/06/2017 and was due to 1801 T/C losing bite
for compression at low plant rates. The event continued into the next day.
A flaring event occurred at FS2 continuing from the day before and stopping at 08/07/2017 04:22 with a volume of
906 (MSCF) on 08/07/2017. The event lasted for 261 minutes on 08/07/2017 and was due to 1801 T/C losing bite
for compression at low plant rates. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/07/2017 05:28 and carrying on into 08/08/2017 with a volume of
3861 (MSCF) on 08/07/2017. The event lasted for 1112 minutes on 08/07/2017 and was due to T/C 1801
unloading due to high IP discharge temperature. The event continued into the next day.
A flaring event occurred at FS2 continuing from the day before and stopping at 08/08/2017 02:48 with a volume of
696 (MSCF) on 08/08/2017. The event lasted for 167 minutes on at 08/08/2017 and was due to an inability to keep
T/C 1801 loaded due to high IP discharge temperature issues. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/08/2017 15:05 and stopping at 08/08/2017 16:44 with a volume of
413 (MSCF). The event lasted for 99 minutes and was due to an inability to keep T/C 1801 loaded due to high IP
discharge temperature issues. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/08/2017 17:14 and stopping at 08/08/2017 19:15 with a volume of
588 (MSCF). The event lasted for 121 minutes and was due to an inability to keep T/C 1801 loaded due to high IP
discharge temperature issues. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/09/2017 08:12 and stopping at 08/09/2017 10:20 with a volume of
418 (MSCF). The event lasted for 128 minutes and was due to an inability to keep T/C 1801 loaded due to high IP
discharge temperature issues. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/10/2017 21:04 and stopping at 08/10/2017 22:42 with a volume of
476 (MSCF). The event lasted for 98 minutes and was due to an inability to keep T/C 1801 loaded due to high IP
discharge temperature issues. The event stopped when the compressor loaded.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
0 Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP Au ust-2017
20. Forprotluction from multiple pools, list contribution of each pool as a percent of
Tota/ Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00°
B. Flared or vented 1 hour or less
381
9. Flared or vented more than 1 hour (see instr.)
11,682
10. Pilot and Purge
13,235
11. Assist Gas
21,657
12. Fuel gas used in lease operations.
385,159
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
MCF v.T
14. TOTAL VOLUME (ITEMS 6-12)
432,114
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from: CGF
217,389
18. Transferred to: (Express as a negative #) CGF
-18 277 859
Commissioner Date
19. Remarks:
I hereby certify that he foregoing is true and correct to the best of my knowledge.
Signature e1 Note: All volumes must be corrected
Title ti Manager Production Taxes and Royalties Alaska to pressure of 14.65 Asia and to a
Printed Name Diane Colleyp 7 t-mpereture of 600 F. Authority 20
Phone (907) 564-5775 Date `I d' I
N /7 -
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
August 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/6/2017 0315-0412 158 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
8/6/2017 1503-1536 92
8/8/2017 1427-1435 33
8/9/2017 1600-1630 98
TOTAL 381
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/5/2017
1326-2220
1,113
See attachments
See attachments
8/5-6/17
2343-0110
227
8/6/2017
0452-1452
1,667
8/6-7/17
1606-0422
2,223
8/7-8/17
0528-0248
4,557
8/8/2017
1505-1644
413
8/8/2017
1714-1915
588
8/9/2017
0812-1020
418
8/10/2017
2104-2242
476
TOTAL
11,682
Planned events less than or equal to 1 hour
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
DATE
TOTAL
0
See attachments
ACTION TAKEN TO f
See attachments
Page 4
9/14/2017
4:31 PM
BP EXPLORATION (ALASKA( INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
August 2017
Page 5
9/14/2017
4:31 PM
TOTAL
Unplanned Events < 1 Hour
381
Unplanned Events > 1 Hour
11,682
Planned Events < 1 hour and not
0
exceeding 5,000 WE
Planned Events > 1 hour or
0
exceeding 5,000 WE
Pilot Purge
13,235
Assist
21,657
TOTAL FLARED VOLUME
46,955
Page 5
9/14/2017
4:31 PM
Flare Start Date 08/01/2017
Flare End Date 08/31/2017
FS2 Flare Report
Total Volume (MSCF)
12063
Report
Numbe System Date StartTime Stop Time Duration Intermittent
Black Smoke
Planned Reported By
Volume
17-310 Controlled Blowdown 08/05/2017 1:26:00 pm 10:20:00 pm 534 min No
No
No BP1\RALPHJM
1113
Determination Cause 1801 TIC unable to get a bite for compression at plant low rates.
Action Taken Continue to attempt to load wmpressor.
17-310 Controlled Slowdown 08/05/2017 11:43:00 pm 12:00:00 am 17 min No
No
No BP11RALPHJM
35
Determination Cause 1801 T/C lost b8e.
Action Taken Continue to attempt to re -load compressor as plant rate increases.
Daily Volume (MSCF)
1148
17-311 Controlled Slowdown 08/06/2017 12:01:00 am 1:10:00 am 69 min No
No
No BP7\RALPHJM
192
Determination Cause Attempt to load 1601.
Action Taken Loaded 1801.
17-311 Controlled Blowdown 08/06/2017 4:52:00 am 2:52:00 pm 600 min No
No
No BP1\RALPHJM
1667
Determination Cause Unable to keep T/C 1801 loaded.
Action Taken Reloaded TIC 1801.
17-311 Controlled Slowdown 08/06/2017 4:06:00 pm 12:00:00 am 474 min No
No
No BP1\RALPHJM
1317
Determination Cause Unable to load T/C 1801.
Action Taken Attempt to load T/C.
Daily Volume (MSCF)
3426
17-312 Controlled Blowdown 08/07/2017 12:0100 am 4:22:00 am 261 min No
No
No BPI\RALPHJM
906
Determination Cause Unable to load 1801 T/C.
Action Taken Loaded TIC 1801,
17-312 Controlled Blowdown 08/07/2017 5:28:00 am 12:00:00 am 1112 min No
No
No BPI\RALPHJM
3861
Determination Cause Unloaded 180-1 due to High IP discharge temp.
Action Taken Continue attempts to load 1801 T/C.
Daily Volume (MSCF)
4767
17-313 Controlletl Blowdown 08/08/2017 12:01:00 am 2:48:00 am 167 min No
No
No BP1\RALPHJM
696
Determination Cause Unable to keep 1801 TIC loaded due to IP discharge temp issues.
Action Taken Reloaded T/C 1801,
17-313 Controlled Slowdown 08/08/2017 3:05:00 pm 4:44:00 pm 99 min No No No BPI\RALPHJM 413
Determination Cause Unable to keep TIC 1801 loaded due to IP Discharge Temp issues.
Action Taken Reloaded T/C 1801.
17-313 Controlled Slowdown 08/08/2017 5:14:00 pm 7:15:00 pm 121 min No No No BP1 \RALPHJM 588
Generated 09/06/2017 4:06:25PM Page 5 of 11
Flare StartDate 08/01/2017
Flare End Date 08/31/2017
Determination Cause Unable to keep T/C 1801 loaded due to IF discharge temp issues.
Action Taken Reloaded T/C 1801.
Daily Volume (MSCF) 1730
17-317 Controlled Blowdown 08/09/2017 8:12:00 am 10:20:00 am 128 min No No No BP1\TWEEDSL 418
Determination Cause Had to unload compressor due to temps
Action Taken Loaded compressor back up.
17-322 Controlled Blowdown 08/10/2017 9:04:00 pm 10:42:00 pm 98 min No No No BP7\ELLISOFD 476
Determination Cause Unloaded 1801 due to high IP Discharge Temp.
Action Taken Reloaded compressor.
Daily Volume (MSCF) 475
Total Volume (MSCF) 12063
Generated 09/06/2017 4.06:25PM Page 6 of 11
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, August 25, 2017 2:46 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Bessler,
Mark; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; Glover, Robin; Buckbee, Rachel
A; AK, OPS FS2 OSM
Subject: Flaring Events at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc reporting aWaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 07/28/2017 15:30 and carrying on into 07/29/2017 with a volume of 30
(MSCF) on 07/28/2017. The event on 07/28/2017 lasted for 509 minutes and was due to depressurizing the FS2
Area for 2017 TAR. This includes plant, Drill Sites, Artificial Lift, and MI gas. The event carried on into the following day.
A flaring event occurred at FS2, continuing from the day before and stopping at 07/29/2017 11:20 with a volume of
10845 (MSCF) on 07/29/2017. The event lasted for 680 minutes on 07/29/2017 and was due to depressurizing for
the 2017 TAR. The event stopped when depressurization was completed.
A flaring event occurred at FS2 starting at 08/05/2017 13:26 and stopping at 08/05/2017 22:20 with a volume of
1113 (MSCF). The event lasted for 534 minutes and was due to restarting the facility and 1801 T/C unable to get a
bite for compression at low plant rates. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/06/2017 00:01 and stopping at 08/06/2017 01:10 with a volume of
192 (MSCF). The event lasted for 69 minutes and was due to 1801 T/C losing bite for compression at low plant
rates. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/06/2017 04:52 and stopping at 08/06/2017 14:52 with a volume of
1667 (MSCF). The event lasted for 600 minutes and was due to 1801 T/C losing bite for compression at low plant
rates. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/06/2017 16:06 and carrying on into 08/07/2017 with a volume of
1317 (MSCF) on 08/06/2017. The event lasted for 474 minutes on 08/06/2017 and was due to 1801 T/C losing bite
for compression at low plant rates. The event continued into the next day.
A flaring event occurred at FS2 continuing from the day before and stopping at 08/07/2017 04:22 with a volume of
906 (MSCF) on 08/07/2017. The event lasted for 261 minutes on 08/07/2017 and was due to 1801 T/C losing bite
for compression at low plant rates. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/07/2017 05:28 and carrying on into 08/08/2017 with a volume of
3861 (MSCF) on 08/07/2017. The event lasted for 1112 minutes on 08/07/2017 and was due to T/C 1801
unloading due to high IP discharge temperature. The event continued into the next day.
A flaring event occurred at FS2 continuing from the day before and stopping at 08/08/2017 02:48 with a volume of
696 (MSCF) on 08/08/2017. The event lasted for 167 minutes on at 08/08/2017 and was due to an inability to keep
T/C 1801 loaded due to high IP discharge temperature issues. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/08/2017 15:05 and stopping at 08/08/2017 16:44 with a volume of
413 (MSCF). The event lasted for 99 minutes and was due to an inability to keep T/C 1801 loaded due to high IP
discharge temperature issues. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/08/2017 17:14 and stopping at 08/08/2017 19:15 with a volume of
588 (MSCF). The event lasted for 121 minutes and was due to an inability to keep T/C 1801 loaded due to high IP
discharge temperature issues. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/09/2017 08:12 and stopping at 08/09/2017 10:20 with a volume of
418 (MSCF). The event lasted for 128 minutes and was due to an inability to keep T/C 1801 loaded due to high IP
discharge temperature issues. The event stopped when the compressor loaded.
A flaring event occurred at FS2 starting at 08/10/2017 21:04 and stopping at 08/10/2017 22:42 with a volume of
476 (MSCF). The event lasted for 98 minutes and was due to an inability to keep T/C 1801 loaded due to high IP
discharge temperature issues. The event stopped when the compressor loaded.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From:
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Tuesday, October 31, 2017 7:54 AM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Bessler,
Mark; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; Glover, Robin; Buckbee, Rachel
A; AK, OPS FS2 OSM
Subject:
Flaring Events at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reporting (o)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 09/23/2017 07:40 and stopping on 09/27/2017 at 08:30. Volumes and
durations for each day are listed below. The event was due to shutting down STV -IP T\C 1801 for the 4000 hour engine
swap. The event stopped when the engine swap and associated maintenance was completed and the STV -IP 1801 was
restarted.
• Starting at 09/23/2017 07:40 and stopping at 09/23/2017 23:59 with a volume of 6261 (MSCF). The event lasted
for 979 minutes.
• starting at 09/24/2017 00:00 and stopping at 09/24/2017 23:59 with a volume of 9200 (MSCF). The event lasted
for 1439 minutes
• starting at 09/25/2017 00:00 and stopping at 09/25/2017 23:59 with a volume of 9200 (MSCF). The event lasted
for 1439 minutes
• starting at 09/26/2017 00:00 and stopping at 09/26/2017 23:59 with a volume of 9200 (MSCF). The event lasted
for 1439 minutes
• starting at 09/27/2017 00:00 and stopping at 09/27/2017 08:30 with a volume of 2939 (MSCF). The event lasted
for 510 minutes
Thanks,
Jennifer Blake
ECC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Monthlyear of Disposition
Se tember-2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
36,800
10. Pilot and Purge
12,742
11. Assist Gas
4,178
12. Fuel gas used in lease operations.
446,805
13. Other (see instructions)
0
Official Use OnlyAuthorization>i
hr:
/ry�d
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
500,525
Lease Use
(
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
248,121
18. Transferred to: (Express as a negative #) CGF
-23,919,519
Commissioner Date
19. Remarks:
I hereby certify that /)the foregoing is true and correct to the best of my knowledge.
6/ 4� Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date ( I ,3 7
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
September 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
events greater than 1 hour
CAUSE
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUMF nFCfPIDT nm AC WringNT 2 rAl ICC A—.,.A. ......
TOTAL
09/23-27/17 0740-0830
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
0
VULUME DESCRIPTION OF IN
36,800 See attachments
36,800
TOTAL
0
0
0
36,800
12,742
4,178
53,720
See attachments
See attachments
Page 4
10/12/2017
2:33 PM
Flare Start Date 09/01/2017
Flare End Date 09/30/2017
FS2 Flare Report Total Volume (MSCF) 36800
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-387 Controlled Blowdown 09/23/2017 7:40:00 am 11:59:00 pm 979 min
No
No
Yes BPi\FOISNL
6261
Determination Cause STV -IP T\C 1801 shutdown due to a problem associated with 4000 hr engine swap
Action Taken SD for 4000 hr engine swap
Daily Volume (MSCF)
6261
17-381 Controlled Slowdown 09/24/2017 12:00:00 am 11:59:00 pm 1439 min
No
No
Yes BP1\STRACe
9200
Determination Cause 1801 shutdown for 4000 hr engine swap
Action Taken Still on flare pending engine swap
Daily Volume (MSCF)
9200
17-384 Controlled Slowdown 09/25/2017 12:00:00 am 11:59:00 pm 1439 min
No
No
Yes BP1\STRACe
9200
Determination Cause 1801 4000 hr engine swap
Action Taken Still on flare engine swap ongoing
Daily Volume (MSCF)
9200
17-385 Controlled Blowdown 09/26/2017 12:00:00 am 11:59:00 pm 1439 min
No
No
Yes BP1\LOREJ3
9200
Determination Cause 1801 shutdown for 4000hr engine swap and AC2 upgrade work
Action Taken 1801 still down pending AC2 upgracle work.
Daily Volume (MSCF)
9200
17-386 Controlled Slowdown 09/27/2017 12:00:00 am 8:30:00 am 510 min
No
No
Yes BP1\STRAC8
2939
Determination Cause 1801 down for 4000hr engine swap
Action Taken Still on flare pending GG tube oil pressure issue.
Daily Volume (MSCF)
2939
Total Volume (MSCF) 36800
Generated 10/02/2017 2:13:02PM Page 3 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODI]nFn c;os n1cpnciT1nti
1. Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP October -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00°/
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
13,232
11. Assist Gas
533
12. Fuel gas used in lease operations.
487,987
13. Other (see instructions)
Official Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
501,752
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF
279,816
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-24,686,800
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
&�� 1 Note: All volumes must be corrected
Signature ( i 1 Title Manager Production Taxes and Rovallies Alaska to pressure of 14.65 psis and to a
Printed Name Diane Colleytemperature of 60o F. Authority 20
Phone (907) 564-5775 Date
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
October 2017
Lunplannea events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
See attachments See attachments
TOTAL 0
Planned events less than or eoual to 1 hour
See attachments
TOTAL 0
nett
VOLUME DESCRIPTION OF INi
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
13,232
Assist
533
TOTAL FLARED VOLUME
13,765
See attachments
See attachments
[rLDFli
Page 5
11/13/2017
9:27 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY RFPnRT nF pannl llrCn l -1A0
1.
Facility Number 2. Facility Name
0029 PBU FS 2
3. Field
PBU - EOA
4. Operator 5. Month Year of Disposition
Disposition
Volume MCF
BP November -2017
20. For production from multiple pools, list contribution of each pool as a percent o/
Sold
0
Total Volume.
rFlared
Pool Name Pool Code Percent
ted
0
PRUDHOE 640150 100.00%
or vented 1 hour or less
0
9.
Flared or vented more than 1 hour (see insfr.)
0
10.
Pilot and Purge
12 322
11.
Assist Gas
0
12.
Fuel gas used in lease operations.
595,359
13.
Other (see instructions)
0Official
Use Only
Authorization>t he MCF
14.
TOTAL VOLUME (ITEMS 6-12)
607,681
Safety
15.
NGL Gas Equivalent
Lease Use MCF
0
16.
Purchased gas
Conservation MCF
0
Waste: MCF
17.
Transferred from: CGF
278,618
18.
Transferred to: (Express as a negative #) CGF
-24,626,895
Commissioner Date
19.
Remarks:
I hereby certify thati/'/ne�����Foregoing is true and correct to the best of my knowledge.
Signature__ ` �IQQl %
Note: All volumes must be corrected
Title Manager Production Taxes and ROvalties Alaska to pressure of 14.65 Asia and to a
Printed
Name Diane Colley
temperature of 60o F. Authority 20
Phone (907) 564-5775
Dafe /
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - Fs -2
GAS FLARING INCIDENT REPORT
November 2017
events less than or equal to
__ _..... _.. _.... _.__.., AL I1UN IAKtN TU ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
-- I1rvic vULUMt DESCRIPTION OF INCIDENT & CAUSE - ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned events less than or equal to 1 hour
See attachments
TOTAL 0
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
12,322
Assist
0
TOTAL FLARED VOLUME
12,322
ACTION TAKEN TO I
See attachments
See attachments
Page 4
12/13/2017
9,07 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000029
Facilit, Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthlYear of Disposition
I December -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
1,850
10. Pilot and Purge
12,896
11. Assist Gas
3,248
12. Fuel gas used in lease operations.
711,099
13. Other (see instructions)
U
Official Use Only
Authorization>1 hr:
1,
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
729,093
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0.
Waste:
MCF
17. Transferred from: CGF
290,754
/
/ C _ ,p
, / _ _ 3-1f
Y—a�- ! 7 CJ
18. Transferred to: (Express as a negative # CGF
( p 9 )
-26,567,162
Commissioner Date`
19. Remarks:
I hereby certify that the/foregOng is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Com tit Title Manager Production Taxes and Royalties Alaska to pressure Of 14.65 psis and t0 a
1 / /� temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date t
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC. Page 5
PRUDHOE BAY UNIT- FS -2
GAS FLARING AND VENTING INCIDENT REPORT
December 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/29/2017 0850-1410 333 See attachments See attachments
12/29/2017 1410-1800 1,517
TOTAL 1,850
Planned events less than or equal to 1 hour
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSI
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
See attachments See attachments
TOTAL 0
1/12/2018
9:58 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
1,850
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
12,896
Assist
3,248
TOTAL FLARED VOLUME
17,994
1/12/2018
9:58 AM
Flare Start Date 12/01/2017
Flare End Date 12/31/2017
FS2 Flare Report Total Volume
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-462 Controlled Blowdown 12/29/2017 8:50:00 am 2:10:00 pm 320 min No No Yes BPIIELLISOFD 333
Determination Cause Extended flaring event occurred while awaiting operator/maintenance evaluation.
Action Taken Loaded STV/IP T/C once 1801 recycle valve was repaired.
17-462 Controlled Blowdown 12/29/2017 2:10:00 pm 8:00:00 pm 230 min No No Yes BP1\ELLISOFD 1517
Determination Cause STV -IP TC 1801 shutdown due to controNnstrumentation failure associated with STV recycle valve issues
Action Taken Loaded STV/IP T/C after recycle valve repairs.
Total Volume (MSCF)
Generated 01/08/2018 10:33:46AM Page 5 of 9