Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU GC 1 - BP Exploration (Alaska), Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2017
Facility: PBU GC 1
Operator: BP EXPLORATION (ALASKA) INC.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. FacilityNumber2.
0290000031
Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I January -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 97,39%
LISBURNE 640144 0.26%
8. Flared or vented lhour or less
9
MIDNIGHT SUN 640158 0.08%,205
PT MCINTYRE 640180 2.27%
9. Flared or vented more than 1 hour (see instr.)
2,865
10. Pilot and Purge
53,809
11. Assist Gas
0
12. Fuel gas used in lease operations.
816,331
13. Other (see instructions)
0Authorization
Official Use Only
>1 hr:
Safety
2 6 4� 5-
MCF
14. TOTAL VOLUME (ITEMS 6-12)
882,210
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
3
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-72,518,466
19. Remarks:
I hereby certify thatth foregoing its true and correct to the best of my knowledge.
(Cl'l ��'I Note: All volumes must be corrected
Signature t,t r u �(G I Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date " AAC25.235.
i Ti-
)'? 1 P
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
January 2017
1/1/2017 0135-0207
410 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
1/1/2017 0829-0927
1,410
2,865
1/1/2017 2114-2139
1,060
exceeding 5,000 MCF
1/2/2017 0325-0405
1,740
0
1/15/2017 1059-1107
100
Pilot Purge
1/19/2017 0845-0847
4
0
1/21/2017 1614-1615
2
1/23/2017 1815-1858
4,479
TOTAL
9,205
Unplanned events greater than 1 hour
DATE TIME
1/1/2017
VOLUME DESCRIPTION OF INCIDENT &CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
0105-2359
1,800 See attachments
See attachments
1/2/2017 0333-2359
713
1/10/2017 1457-2245
166
1/29/2017 0830-1357
186
TOTAL
2,865
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Page 6
2/12/2017
5:13 PM
TOTAL
Unplanned Events < 1 Hour
9,205
Unplanned Events> 1 Hour
2,865
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
53,809
Assist
0
TOTAL FLARED VOLUME
65,879
Page 6
2/12/2017
5:13 PM
Flare Start Date 01/01/2017
Flare End Date 01/31/2017
GCI Flare Report Total Volume (MSCF) 12070
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-2 Flare Relief 01/01/2017 1:05:00 am 11:59:00 pm 1374 min Yes No No BPIkLOTTTO 1800
Determination Cause High gas transit line pressure
Action Taken WOA stopped bringing production rates up. reduced rates until Baring stopped.
17-5 Flare Relief 01/02/2017 3:33:00 am 11:59:00 pm 1226 min Yes No
No BPIILOTTTO
713
Determination Cause
High gas transit line pressure
Action Taken
No response taken as this was deemed to be of short duration.
Daily Volume (MSCF)
2453
17-19 Flare Relief 01/10/2017 2:57:00 pm 10:45:00 pm 468 min Yes No
No BPIISPRINGG
166
Determination Cause
Unstable process
Action Taken
Process stabilized
Daily Volume (MSCF)
166
Generated 02102/2017
11:09:42AM
Page 5 of 8
Flare Start Date 01/01/2017
Flare End Date 01/31/2017
17-37 Flare Relief 01/29/2017 8:30:00 am 1:57:00 pm 327 min Yes No No BP1\SPRINGG 186
Determination Cause High gas transit line pressure
Action Taken No response taken as this was deemed to be of short duration.
Daily Volume (MSCF) 186
Total Volume (MSCF) 12070
Generated 02/02/2017 11:09:42AM Page 6 of 8
A flaring event occurred at GC1 starting at 01/01/2017 01:05 and stopping at 01/01/2017 23:59 with a volume of 1800
(MSCF). The event was intermittent, lasted for 1374 minutes, and was due to high transit gas pressure. The flaring event
stopped when the gas transit pressure was lowered.
A flaring event occurred at GC1 starting at 01/02/2017 03:33 and stopping at 01/02/2017 23:59 with a volume of 713
(MSCF). The event was intermittent, lasted for 1226 minutes, and was due to high transit gas pressure caused by CGF's
1&2 boosters tripping offline. The flaring event stopped when the gas transit pressure was lowered.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Wednesday, January 04, 2017 12:29 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner, Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GCI Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Events at GCI
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc. reportingt7a.alaska.gov Victoria. loepp(cbalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring ev\tran
rred at GC1 starting at 11/30/2016 11:04 and stopping at 11/30/2016 15:16 with a volume of
64 (MSCFvent lasted for 252 minutes and was due to high gas transit line pressure. The flaring event stopped
when the gt pressure was lowered.
A flaring event occurre4,at GC1 starting at 12/02/2016 08:06 and stopping at 12/02/2016 11:37 with a volume of
113 (MSCF). The event ted for 211 minutes and was due to large oil swings through the Annex. The flaring event
stopped when rates stabilized.
A flaring event occurred at GC1 starts at 12/07/2016 14:34 and stopping at 12/07/2016 16:24 with a volume of
750 (MSCF). The event lasted for 11 inutes and was due a shutdown of A Bank. The flaring event stopped when
rates were reduced and A bank was restarte
A flaring event occurred at GC1 starting at 12/12/ 16 14:06 and stopping at 12/12/2016 19:24 with a volume of 225
(MSCF). The event was intermittent, lasted for 318 rn utes, and was due to spurious actuation of the LP Flare Valve. The
intermittent flaring event stopped without intervention and a work order was submitted to calibrate the high pressure
switch controlling the valve..
A flaring event occurred at GCI starting at 12/13/2016 01:4 and stopping at 12/13/2016 13:11 with a volume of 128
(MSCF). The event was intermittent, lasted for 688 minutes, d was due to spurious activation of the LP Flare Valve. The
intermittent flaring event stopped and the pressure switch was librated.
A flaring event occurred at GC1 starting at 12/15/2016 21:20 and stppping at 12/15/2016 22:59 with a volume of 1450
(MSCF). The event lasted for 99 minutes and was due to flaring off the IP/HP gas system as a result of a Stop Production
caused by a UPS power glitch. The flaring event stopped when the UP power was restored.
A flaring event occurred at GC1 starting at 12/15/2016 21:29 and stopping*t 12/15/2016 23:03 with a volume of 128
(MSCF). The event lasted for 94 minutes and was due to intermittent flaring 6 the LP gas system as a result of a Stop
Production caused by a UPS power glitch. The flaring event stopped when the PS power was restored.
A flaring event occurred at GC1 starting at 12/19/2016 08:00 and stopping at 12/19 016 10:00 with a volume of 37500
(MSCF). The event lasted for 120 minutes and was due to the Annex reboiler shutdo n for combustion blower filter
inspection. The flaring event stopped when the reboiler was placed back in service.
A flaring event occurred at GC1 starting at 12/29/2016 04:17 and stopping at 12/29/2016 23:59 with a volume of 553
(MSCF). The event was intermittent, lasted for 1182 minutes, and was due to high transit gas pressure. The flaring event
stopped when the gas transit pressure was lowered.
A flaring event occurred at GC1 starting at 12/31/2016 00:34 and stopping at 12/31/2016 23:58 with'a volume of 1000
(MSCF). The event was intermittent, lasted for 1182 minutes, and was due to high transit gas pressur The flaring event
stopped when the gas transit pressure was lowered.
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, February 07, 2017 7:45 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory, Schinagl, Werner; Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Events at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc. reporting Qalaska.gov Victoria. IoeppCa.alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 01/29/2017 08:30 and stopping at 01/29/2017 13:57 with a volume of 186
(MSCF). The event was intermittent for the duration of 327 minutes. The event was due to high transit gas line pressure.
The flaring event stopped when the ambient temperatures dropped and the transit gas line pressure reduced.
A flaring event occurred at GC1 starting at 02/04/2017 04:45 and stopping at 02/04/2017 17:47 with a volume of 886
(MSCF). The event was intermittent for the duration of 782 minutes. The event was due to high transit gas line pressure.
The flaring event stopped when the ambient temperatures dropped and the transit gas line pressure reduced.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blakePbp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000031 PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonlhNear of Disposition
BP I February -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
URMIDNIGHTSUN
Pool Code Percent
7. Reinjected
U
640150 97.64%
640144 0.25%
8. Flared or vented 1 hour or less
U
640158 0.10%
640180 201%
9. Flared or vented more than 1 hour (see instr.)
24,857
10. Pilot and Purge
48,260
11, Assist Gas
0
12. Fuel gas used in lease operations.
733,474
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr
Safety
Z ^ `�
f� J
MCF
14. TOTAL VOLUME (ITEMS 6-12)
$06,591
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-66,554,400
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�� Note: Ali volumes must be corrected
Signature_ Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
V^ "TL�
4 / -1 1 (7 ---
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
TOTAL
U
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -1
GAS FLARING INCIDENT REPORT
February 2017
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
junplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/4/2017 0445-0547 886 See attachments See attachments
2/15/2017 1100-1300 100
2/25/2017 0203-0248 23,871
TOTAL 24,857
See attachments
TOTAL 0
DESCRIPTION OF IN
See attachments
TOTAL 0
See attachments
See attachments
Page 8
3/15/2017
10:10 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events 1 Hour
24,857
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
48,260
Assist
0
TOTAL FLARED VOLUME
73,117
See attachments
See attachments
Page 8
3/15/2017
10:10 AM
Flare Start Date 02/012017
Flare End Date 02/28/2017
GCI Flare Report Total Volume (MSCF) 24857
Report
Numbs System
Date Start Time Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
17-39 Flare Relief 02/04/2017 4:45:00 am 5:47:00 pm 782 min Yes
No No BPIISPRINGG
886
Determination Cause
High gas transit line pressure
Action Taken
No response taken
Daily Volume (MSCF)
886
17-50 Flare Relief 02/15/2017 11:00:00 am 1:00:00 pm 120 min Yes
No No SP1\FUELMO
100
Determination Cause
High transit gas pressure, caused intermittent flaring off of V-136
Action Taken
Transit gas pressure taken down and intermittent flaring stopped.
Daily Volume (MSCF) 100
17-62 Flare Relief 0225/2017 2:03:00 am 2:48:00 pm 765 min No No No BP1\SPRINGG 23871
Determination Cause Had a Power Supply Failure in SK -18
Action Taken Equipment was restarted
Daily Volume (MSCF) 23871
Total Volume (MSCF) 24857
Generated 03/01/2017 3:11:04PM Page 8 of 9
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, February 24, 2017 3:00 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Barton, Kim;
AK, HSSEE Env Adv West; AK, OPS GCI Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Events at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting(a)alaska.gov Victoria.loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 02/15/2017 11:00 and stopping at 02/15/2017 13:00 with a volume of 100
(MSCF). The event was intermittent over a 120 minutes duration and was due to high gas transit line pressure. The flaring
event stopped when the gas transit pressure was lowered.
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jennifer.blake(@bp.com
Link, Liz M (DOA)
From:
AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Thursday, March 16, 2017 1:49 PM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject:
Flaring Event at GC1
To: AOGCC Reporting
CC: Victoria Loepp, AOGCC
Aogcc. reporting(a)alaska.
gov Victoria. loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GCI starting at 02/25/2017 02:03 and stopping at 02/25/2017 14:48 with a volume of 23871
(MSCF). The event lasted for 765 minutes and was due to power supply failure in Skid 18, which is the LP/IP Compressor
skid. The flaring event stopped when the equipment was repaired and the affected process was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake Cdbp.com
Link, Liz M (DOA)
From:
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Tuesday, February 07, 2017 7:45 AM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Barton, Kim;
AK, HSSEE Env Adv West; AK, OPS GCI Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject:
Flaring Events at GCI
To: AOGCC Reporting
CC: Victoria Loepp, AOGCC
Aoncc.reporting( alaska.gov
Victoria. loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 01129/2017 08:30 and stopping at 01/29/2017 13:57 with a volume of 186
(MSCF). The event was intermittent for the duration of 327 minutes. The event was due to high transit gas line pressure.
The flaring event stopped when the ambient temperatures dropped and the transit gas line pressure reduced.
A flaring event occurred at GC1 starting at 02/04/2017 04:45 and stopping at 02/04/2017 17:47 with a volume of 886
(MSCF). The event was intermittent for the duration of 782 minutes. The event was due to high transit gas line pressure.
The flaring event stopped when the ambient temperatures dropped and the transit gas line pressure reduced.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PB GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonthlYear of Disposition
March -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6 Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 97.62%
LISBURNE 640144 0.25%
8. Flared or vented lhour or less
1897
MIDNIGHT SUN 640158 0,04%j,897
MCINTYRE 640180 2.09%
9. Flared or vented more than 1 hour (see instr.)
725
10. Pilot and Purge
53,594
11, Assist Gas
0
12. Fuel gas used in lease operations.
807,353
13. Other (see instructions)
0Official
Use Only
Authorization>1 hr:
Safety
—725—
MCF Ij �
5-1/
14. TOTAL VOLUME (ITEMS 6-12)
863,569
Lease Use
MCF
15. NGL Gas Equivalent
0
ConservationMCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
O
o �L
18. Transferred to: (Express as a negative #) CGF
-72,462,316
Commissioner Date
19. Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
�h� C44�(lQC Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
"temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
March 2017
junplanneo events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/15/2017 0452-0504 1,567 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
3/21/2017 1753-1832 40
TOTAL 1,607
3/30/2017
3/31/2017
0125-2210
0125-2010
TOTAL
568 See attachments
157
725
See attachments
3/1/2017 1705-1710 70 See attachments See attachments
3/7/2017 2054-2058 20
3/8/2017 0050-0054 120
3/26/2017 1334-1338 80
TOTAL 290
Planned events Qreater than 1 hour
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
TOTAL
1,607
725
290
0
53,594
0
56,216
See attachments
See attachments
Page 7
4/13/2017
10:32 AM
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, April 10, 2017 11:09 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory, Schinagl, Werner; Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL, AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Events at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting (a)alaska.gov Victoria. loepp(o)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 03/30/2017 01:25 and stopping at 03/30/2017 22:10 with a volume of 568
(MSCF). The event lasted for 1245 minutes and was intermittent in nature. It was due to high gas transit line
pressure. The flaring event stopped when the transit line pressure was reduced.
A flaring event occurred at GC1 starting at 03/31/2017 01:25 and stopping at 03/31/2017 22:10 with a volume of 157
(MSCF). The event lasted for 1245 minutes and was intermittent in nature. It was due to high gas transit line
pressure. The flaring event stopped when the transit line pressure was reduced.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer. bla ke@bp.com
Flare Start Date 03/01/2017
Flare End Date 03/3112017
GC1 Flare Report Total Volume (MSCF) 2622
Report
Numbe System Date StartTime
Stop Time
Duration Intermittent
Black Smoke Planned Reported By
Volume
17-69 Flare Relief 03/01/2017 5:05:00pm
5:10:00 pm
5min No
No Yes BP1\SPRINGG
70
Determination Cause Swapped GLT machines
Action Taken No response taken as this was deemed to be of short duration.
Daily Volume (MSCF)
70
17-77 Controlled Blowdown 03/07/2017 10:54:00 pm
10:58:00 pm
4 min No
No Yes BP1\SPRINGG
20
Determination Cause Swapped GLT machines
Action Taken swap complete
Daily Volume (MSCF)
20
17-78 Controlled Slowdown 03/08/2017 12:50:00 am
12:54:00 am
4 min No
No Yes BP1\SPRINGG
120
Determination Cause Depressured GLT3200
,
Action Taken depressure complete
Daily Volume (MSCF)
120
17-96 Controlled Blowdown 03/26/2017 1:34:00 pm
1:38:00 pm
4 min No
No Yes BP1\SPRINGG
80
Determination Cause Swapped GLTmachines
Action Taken depressured
Daily Volume (MSCF)
80
17-100 Flare Relief 03/30/2017 1:25:00 am
10:10:00 pm
1245 min Yes
No No BP1\SPRINGG
568
Determination Cause High gas transit line pressure
Action Taken No response taken
Daily Volume (MSCF)
568
17-101 Flare Relief 03/31/2017 1:25:00 am
10:10:00 pm
1245 min Yes
No No BP1\SPRINGG
157
Determination Cause High gas transit line pressure
Action Taken No response taken
Daily Volume (MSCF)
157
Total Volume (MSCF)
2622
Generated 04/03/2017 4:36:08PM Page 6 of 7
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000031
Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
I April -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 97.48%
LISBURNE 640144 0.27%
8. Flared or vented 1 hour or less
168
MIDNIGHTSUN 640158 0.05%
PT MCINTVRE 640180 2.20%
9. Flared or vented more than 1 hour (see insti.)
0
10. Pilot and Purge
50,695
11, Assist Gas
12. Fuel gas used in lease operations.
840,625
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
891,488
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-69,580,070
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/6P, Note: All volumes must be corrected
Signature r"" u'c7 ,//,/"`�" Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date�Ah AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
April 2017
junplanneo events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/10/2017 0945-1000 120 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
4/17/2017 1454-1459 38
TOTAL 158
Page 7
5/14/2017
2:06 PM
See attachments
See attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/21/2017 1951-1953
10
See attachments
See attachments
TOTAL
10
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
158
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
10
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
50,695
Assist
0
TOTAL FLARED VOLUME
50,863
Page 7
5/14/2017
2:06 PM
Flare StartDate 04/0112017
Flare End Date 04/30/2017
GCI Flare Report Total Volume (MSCF) 166
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-130 Controlled Blowdown 04/21/2017 7'.51:00 pm 7.53:00 pm 2 min No No Yes 3P1WRINGG 10
Determination Cause Started up GLT-3300 (purged)
Action Taken No response taken as this was deemed to be of short duration.
Daily Volume (MSCF) 10
Total Volume (MSCF) 166
Generated 05/02/2017 1.16.36PM Page 8 of 10
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, May 2, 2017 5:20 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Event at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting[7c alaska.gov Victoria. loepp ccDalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 05/01/2017 22:00 and stopping at 05/02/2017 00:00 with a volume of 110
(MSCF). The event lasted for 120 minutes and was due to spin cooling LPS compressor K-7000 for water wash. The
flaring event stopped when the spin cooling was complete.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROnLICFn me nicpnciTink,
-
1. Facility Number 2. Facility Name
0290000031 PBU GC 1
Disposition
---------
3. Field
PBU - WOA
Volume MCF
--.- -.V. VV, ..V..
4. Operator 5. Monlh/Year of Disposition
BP May -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7, Reinjected
0
PRUDHOE 640150 97,19/
LISBURNE 640144 027%
8. Flared or vented 1 hour or less
9 850
MIDNIGHT SUN 640158 0,04%,850
MCINTYRE 640180 2.50%
9. Flared or vented more than 1 hour (see instr.)
5,037
10. Pilot and Purge
52,353
11. Assist Gas
U
12. Fuel gas used in lease operations.
802,977
13. Other (see instructions)
Q
Official Use Only
Authorization >1 hr:
Safety
JSl� 3 7
MCF
:� 1,`)9)
14. TOTAL VOLUME (ITEMS 6-12)
870,217
Lease Use
MCF
15, NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from.
n
18. Transferred to: (Express as a negative #) CGF
-68,858,865
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�'uJ (,l Note: All volumes must be corrected
Signature_ Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Calle temperature of 60o F. Authority 20
Y Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
SP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
May 2017
5/3/2017 2000-2100
833 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
5/7/2017 1015-1020
90
5/9/2017 0746-0819
8,062
5/12/2017 1734-1744
5
5/13/2017 0522-0527
30
5/17/2017 1824-1837
150
5/26/2017 0756-0849
150
TOTAL
9,320
Unplanned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/14/2017 1548-1825
3,460 See attachments
See attachments
TOTAL
3,460
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/3/2017 1048-1123
250 See attachments
See attachments
5/5/2017 1055-1129
180
5/29/2017 0427-0433
90
5/29/2017 0731-0741
10
TOTAL
530
Planned events greater than i hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/1/2017 2200-2400
110 See attachments
See attachments
5/9/2017 1416-1601
1,467
TOTAL
1,577
TOTAL
Unplanned Events < 1 Hour
9,320
Unplanned Events> 1 Hour
3,460
Planned Events < 1 hour and not
530
exceeding 5,000 MCF
Planned Events> 1 hour or
1,577
exceeding 5,000 MCF
Pilot Purge
52,353
Assist
0
TOTAL FLARED VOLUME
67,240
Page 6
6/14/2017
1'.58 PM
Flare StartDate 05/01/2017
Flare End Date 05/3112017
GC1 Flare Report Total Volume (MSCF) 14887
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
t i -t 3fi Other 05/01/2017 10:00:00 pm 12:00:00 am 120 min Yes
Determination Cause K-7000 spin cool for h2o wash
Action Taken none, planned event
17-139 Flare Relief 05/03/2017 10:48:00 am 11:23:00 am 35 min No
Determination Cause Use offuel gas to tum coppus for K-7000 water wash
Action Taken Flaring stopped once the wash was done
17-140 Flare Relief 05/05/2017 10:55:00 am 11:29:00 am 34 min No
Determination Cause Use of fuel gas to tum coppus for K-7001 water wash
Action Taken Flaring sloped once water wash was done
17-151 Flare Relief 05/09/2017 2:16:00 pm 4:01:00 pm 105 min No
Determination Cause Depressured Y/P-LDF through "B" Slugcatcher at GC1 for UDF repair.
for Repair
Action Taken Line was completed depressured allowing work to take place
No Yes BP7\KIRSCHW 110
Daily Volume (MSCF) 110
No Yes BPt\SHELT1 250
No Yes BP1\SHELTI 180
No
17-172 Flare Relief 05/14/2017 3:48:00 pm 6:25:00 pm 157 min No No
Determination Cause K-7000 shutdown on a gas sensor that malfunctioned. It was showing a high gas alar.
Action Taken Flaring stopped once rates were cut
Generated 06/0912017 2:22:08PM
Daily Volume (MSCF)
180
Yes BP1\DELATI
1467
Daily Volume (MSCF)
9529
No BPI\SHELTI
Daily Volume (MSCF)
3460
3460
Page 6 of 9
Flare StartDate 05/01/2017
Flare End Date 05/31/2017
High gas transit line pressure. Flared off D tat stage
17-185 Controlled Blowdown 05/29/2017 4:27:00 am 4:33:00 am 6 min No No Yes BP1I,SPRINGG 90
Determination Cause GLT compressor K-3300 shut down/depressured for H2o wash
Action Taken depressured
17-185 Controlled Blowdl w 05/29/2017 7:31:00 pm 7:41:00 pm 10 min No No Yes BMSPRINGG 10
Determination Cause Started up GILT 3300 after watenvash (PURGE)
Action Taken start-up complete
Daily Volume (MSCF) 100
Total Volume (MSCF) 14887
Generated 06/09/2017 2:22:08PM Page 7 of 9
Link, Liz M (DOA)
From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, May 18, 2017 12:08 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Barton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A; Dean, James A
Subject: Flaring Events at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc. reporting(o)alaska.gov Victoria. loepp()alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 05/09/2017 07:46 and stopping at 05/09/2017 08:19 with a volume of 8062
(MSCF). The flaring event was due to high gas transit pressure when CGF lost a booster compressor. The flaring event
stopped when CGF restarted the booster compressor and gas transit pressures dropped.
A flaring event occurred at GC1 starting at 05/09/2017 14:16 and stopping at 05/09/2017 16:01 with a volume of 1467
(MSCF). The event lasted for 105 minutes and was due to depressurizing Y/P LDF through the B Slug Catcher for
planned LDF repair. The flaring event stopped when depressurization was completed.
A flaring event occurred at GC1 starting at 05/14/2017 15:48 and stopping at 05/14/2017 18:25 with a volume of 3460
(MSCF). The event lasted for 157 minutes and was due to K-7000 compressor shutting down from a malfunctioning gas
sensor. The flaring event stopped when rates were cut.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
FlareStartDate 05/01/2017
Flare End Date 05/31/2017
GCS Flare Report Total Volume (MSCF) 14887
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-136 Other 05/01/2017 10:00:00 pm 12:00:00 am 120 min Yes No
Determination Cause K-7000 spin cool for h2owash
Action Taken none, planned event
17-139 Flare Relief 05/03/2017 10:48:00 am 11:23:00 am 35 min No No
Determination Cause Use of fuel gas to tum coppus for K-7000 water wash
Action Taken Flaring stopped once the wash was done
17-140 Flare Relief 05/05/2017 105500 am 11:29:00 am 34 min No No
Determination Cause Use of fuel gas to tum ceppus for K-7001 water wash
Action Taken Flaring sloped once water wash was done
17-151 Flare Relief 05/09/2017 2:16:00 pm 4:01:00 pm 105 min No
Determination Cause Depmssured Y/P-LDFthmugh"B" Slugcatcherat GCl for LDF repair.
for Repair
Action Taken Line was completed depressured allowing work to take place
Yes BPl\KIRSCHW 110
Daily Volume (MSCF) 110
Yes BP1\SHELTI 180
Daily Volume (MSCF) 180
No Yes BPI\DELATI 1467
17-172 Flare Relief 05/14/2017 3:48:00 pm 6:25:00 pm 157 min No No
Determination Cause K-7000 shutdown on a gas sensor that malfunctioned. It was showing a high gas alarm.
Action Taken Flaring stopped once rates were cut
Daily Volume (MSCF) 9529
No BP1\SHELTI 3460
Daily Volume (MSCF) 3460
Generated 06/09/2017 2:22:08PM Page 6 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
I June -2017
Disposition
Volume MCF
20. For production fmm multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 97.39%
LISBURNE 640144 0.30%
8. Flared or vented 1 hour or less
700
MIDNIGHT SUN 640158 0.05°/PT
MCINTYRE 640180 2.26%
9. Flared or vented more than 1 hour (see instr.)
3,910
10. Pilot and Purge
50,295
11. Assist Gas
0
12. Fuel gas used in lease operations.
810,847
13. Other (see instructions)
U
Official Use Only
Authorization >11 hr:
Safety
3 y, b
MCF
14. TOTAL VOLUME (ITEMS 6-12)
865,752
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
UMCF
Waste:
17. Transferred from:
18. Transferred to: (Express as a negative #) CGF
-65,270,288
Commissioner Date
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
9 1/A y)n Note: All volumes must be corrected
Signature �(.Wf lk Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
V TL
/°!1il /t
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRU DHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
June 2017
unplanned events less than or equal to 1 hour
0452-0457
DATE
TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/4/2017
1252-1256
40 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
6/5/2017
1507-1513
60
6/20/2017
2159-2210
50
6/22/2017
0928-0933
80
6/23/2017
0850-0853
230
TIME
TOTAL
460
DATE
6/23/2017
6/25/2017
6/25/2017
6/25/2017
0835-0955
0822-0945
0822-0945
6/25/2017
TOTAL
AE DESCRIPTION OF IN
2,560 See attachments
402
53
270
3,285
ACTION TAKEN TO ELIMINATE
See attachments
6/22/2017
0452-0457
60 See attachments See attachments
6/24/2017
0315-0321
70
6/25/2017
2044-2047
20
6/26/2017
2051-2059
90
TOTAL
240
Planned events greater than 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/3/2017
2100-2400
625 See attachments See attachments
TOTAL
625
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
460
3,285
240
625
50,295
0
54,905
Page 8
7/18/2017
11:37 AM
Flan; Start Data 06/01/2017
Flare End Date 06/30/2017
GC1 Flare Report
Total Volume (MSCF) 4610
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-193 Flare Relief 06/03/2017 9:00:00 pm 12:00:00 am 180 min No No Yes BP1\LEEJON 625
Determination Cause K-7001 SO and cool down for full function fire and gas PM
Action Taken Closed fuel gas valve to K-7001
Daily Volume (MSCF) 625
17-212 Controlled Blowdown 06/22/2017 4:52:00 am 4:57:00 am 5 min No
Determination Cause GLT compressor K-3300 shutdown due to isolating from east side.
Action Taken depressured
No Yes BP1\SPRINGG 60
17-217 Flare Relief 06/23/2017 8:35:00 am 95500 am 80 min Yes No No BPIGSPRINGG 2560
Determination Cause High gas transit line pressure caused by CCP compressor problems -SID
Action Taken Flaring was permitted to continue while operations personnel attempted to restart the equipment.
17-220 Controlled Blowdown 06/24/2017 3:15:00 am 3:21:00 am 6 min No
Determination Cause
GLT compressor K-3200 shut down for line lifts - depressuretl
Action Taken
depressure done
17-224 Flare Relief 06/25/2017 8:22:00 am 9:45:00 pm 803 min Yes
Determination Cause
LP Flaring due to high ambient temperatures.
Action Taken
Ambient cooled down.
17-224 Other
06/25/2017 8:22:00 am 9:45:00 pm 803 min Yes
Determination Cause
LP Flaring
Action Taken
Stopped Flaring
Generated 07/06/2017 2:44:22PM
No Yes BP1lSPRINGG 70
Daily Volume (MSCF) 70
No No BPIUONESCC 402
No No BPIUONESCC 53
Page 8 of 10
Flare Start Date 06/01/2017
Flare End Date 06/30/2017
17-224 Flare Relief 06/25/2017 5:24:00 pm 10:42:00 pm 318 min Yes
Determination Cause Spurious Stop Production Shutdown
Action Taken Flow into plant isolated.
17-224 Controlled Slowdown 06/25/2017 8:44:00 pm 8:47:00 pm 3 min No
Determination Cause Swapped T -bank HP ->LP -depressured
Action Taken depressum complete
17-229 Controlled Blowdown 06/26/2017 8:51:00 pm 8:59:00 pm 8 min No
Determination Cause Depressured GLT suction header - prep valves for TAR
Action Taken depressure done
Generated 07/06/2017 2:44:22PM
No No BPIWONESCC 270
No Yes SP1\SPRINGG 20
Daily Volume (MSCF) 745
No Yes BPI\SPRINGG 90
Daily Volume (MSCF) 90
Total Volume (MSCF) 4610
Page 9 of 10
Link, Liz M (DOA)
From: Blake, Jennifer J <Jennifer.Blake@bp.com>
Sent: Wednesday, June 14, 2017 10:58 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Dean, James A; Borton, Kim;
AK, HSSEE Env Adv West, AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Event at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting (a alaska.gov Victoria. loepp(d,)alaska.goy
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/03/2017 21:00 and stopping at 06/04/2017 with a volume of 625 (MSCF).
The event lasted for 180 minutes and was due to spin cooling LPS compressor K-7001 for full function fire and gas
PM. The flaring event stopped when the spin cooling was complete.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: Blake, Jennifer J <Jennifer.Blake@bp.com>
Sent: Monday, July 3, 2017 10:44 AM
To: AKOpsProdEOCTL; AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Barton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Events at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting(a)alaska.gov Victoria. loeppanslaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/23/2017 08:35 and stopping at 06/23/2017 09:55 with a volume of 2560
(MSCF). The intermittent event lasted for 80 minutes and was due to high gas transit pressure caused by a CCP
compressor trip. The flaring event stopped when the CCP compressor was reloaded and gas transit pressure was
lowered.
A flaring event occurred at GC1 starting at 06/25/2017 08:22 and stopping at 06/25/2017 21:45 with a volume of 402
(MSCF). The intermittent event lasted for 803 minutes and was due to LP flaring caused by high ambient temperatures.
The flaring event stopped when ambient temperatures cooled down.
A flaring event occurred at GC1 starting at 06/25/2017 08:22 and stopping at 06/25/2017 21:45 with a volume of 53
(MSCF). The intermittent event lasted for 803 minutes and was due to flaring LP assist gas. The flaring event stopped
when the LP gas flaring event stopped.
A flaring event occurred at GC1 starting at 06/25/2017 17:24 and stopping at 06/25/2017 22:42 with a volume of 270
(MSCF). The intermittent event lasted for 318 minutes and was due to a spurious Stop Production shutdown. The flaring
event stopped when flow into the plant ceased (was isolated).
A flaring event occurred at GCI starting at 07/03/2017 21:46 and stopping at 07/03/2017 23:59 with a volume of 22
(MSCF). The intermittent event lasted for 133 minutes and was due to low gas rates to the LP compressor, causing flaring
off of Vessel V-1 20A. The flaring event stopped gas rates through the plant were increased.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITInN
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator .
BP
5. MonthtYear of Disposition
I July -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 98.25%
LISBURNE 640144 0.33%
8. Flared or vented 1 hour or less
0
MIDNIGHT SUN 640158 0.05%
PTMCINTYRE 640180 1.37%
9. Flared or vented more than 1 hour (see instr.)
29,504
10. Pilot and Purge
35,178
11. Assist Gas
0
12. Fuel gas used in lease operations.
341,311
13. Other (see instructions)
O
Official Use Only
Authorization >1 hr:
Safety
�ys��
MCF 1/7—
74. TOTAL VOLUME (ITEMS 8-12)
405,993
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
014,
fl—4 —17
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-26,520,495
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
n
( A11h1P Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro aloes Alaska to pressure of 14.65 psia and to a
' temperature of 60o F. Authority 20
Printed Name Diane Colle Phone (907) 564-5775 Date 114AAC25.235,
7-//-7%-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
SP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
July 2017
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
TOTAL 0
Not required for unplanned events <= 1 hr
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/3/2017 0001-1819 559 See attachments See attachments
7/3/2017 2146-2359 22
7/7/2017 1624-1726 14,583
TOTAL 15,164
DESCRIPTION OF IN
See attachments
See attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/13-14/2017 0000-2359
14,340 See attachments See attachments
TOTAL
14,340
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
15,164
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
14,340
exceeding 5,000 MCF
Pilot Purge
35,178
Assist
0
TOTAL FLARED VOLUME
64,682
Page 10
8/13/2017
3:49 PM
Flare Start Date 07/01/2017
Flare End Date 07/31/2017
GCI Flare Report
Total Volume (MSCF) 29504
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-243 Controlled Blowdown 07/03/2017 12:01:00 am 6:19:00 pm 1098 min Yes No No BPI\SHELTI 559
Determination Cause LP compressor doesn't have enough gas rate to keep forr✓ard Flow and keeps recycling, causing V -120A to pressure up and relief to flare
Action Taken Rates are being brought back into the plant from PM2
17-243 Controlled Blowdown 07/03/2017 9:46:00 pm 11:59:00 pm 133 min Yes No No BP1\SHELTI 22
Determination Cause LP compressor doesn't have enough gas rate to keep fonvard bow and keeps recycling, causing V -120A to pressure up and relief to Flare
Action Taken Called PCC and discussed bringing more gas rate in. PM2 rates are being brought back up.
Daily Volume (MSCF) 581
17-253 Flare Relief 07/07/2017 4:24:00 pm 5:26:00 pm 62 min No No No BP1\SHELTI 14583
Determination Cause High gas transit line pressurecaused by CGF compressor problems
Action Taken PCC reduced production rates and shut-in wells to stop flaring
Daily Volume (MSCF) 14583
17-299 Flare Relief 07/13/2017 12:00:00 am 11:59:00 pm 1439 min Yes No Yes BP7\FISHERCD 2720
Determination Cause TAR Prep
Action Taken None
Daily Volume (MSCF) 2720
17-265 Flare Relief 07/14/2017 12:00:00 am 11:59:00 pm 1439 min Yes No Yes BP1XIRSCHW 11620
Determination Cause tarblowdown
Action Taken none planned
Daily Volume (MSCF) 11620
Total Volume (MSCF) 29504
Generated 08/15/2017 1:28:23PM Page 14 of 15
Link, Liz M (DOA)
From:
Blake, Jennifer 1 <Jennifer.Blake@bp.com>
Sent:
Monday, July 3, 2017 10:44 AM
To:
AKOpsProdEOCTL; AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A, Arthur, Gregory; Starck, Jennifer L; Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject:
Flaring Events at GC1
To: AOGCC Reporting
CC: Victoria Loepp, AOGCC
Aogcc.reporting(g alaska.gov
Victoria. IoeppCcDalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/23/2017 08:35 and stopping at 06/23/2017 09:55 with a volume of 2560
(MSCF). The intermittent event lasted for 80 minutes and was due to high gas transit pressure caused by a CCP
compressor trip. The flaring event stopped when the CCP compressor was reloaded and gas transit pressure was
lowered.
A flaring event occurred at GC1 starting at 06/25/2017 08:22 and stopping at 06/25/2017 21:45 with a volume of 402
(MSCF). The intermittent event lasted for 803 minutes and was due to LP flaring caused by high ambient temperatures.
The flaring event stopped when ambient temperatures cooled down.
A flaring event occurred at GC1 starting at 06/25/2017 08:22 and stopping at 06/25/2017 21:45 with a volume of 53
(MSCF). The intermittent event lasted for 803 minutes and was due to flaring LP assist gas. The flaring event stopped
when the LP gas flaring event stopped.
A flaring event occurred at GC1 starting at 06/25/2017 17:24 and stopping at 06/25/2017 22:42 with a volume of 270
(MSCF). The intermittent event lasted for 318 minutes and was due to a spurious Stop Production shutdown. The flaring
event stopped when flow into the plant ceased (was isolated).
A flaring event occurred at GC1 starting at 07/03/2017 21:46 and stopping at 07/03/2017 23:59 with a volume of 22
(MSCF). The intermittent event lasted for 133 minutes and was due to low gas rates to the LP compressor, causing flaring
off of Vessel V-1 20A. The flaring event stopped gas rates through the plant were increased.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
lennifer.blake@bp.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, August 25, 2017 1:55 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Events at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting(a)alaska.gov Victoria. Ioepp(o)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 07/03/2017 00:01 and stopping at 07/03/2017 18:19 with a volume
of 559 (MSCF). The intermittent event lasted for 1098 minutes and was due to low gas rates to the LP
compressor, causing flaring off of Vessel V -120A. The flaring event stopped when gas rates through the plant
were increased.
A flaring event occurred at GC1 starting at 07/03/2017 21:46 and stopping at 07/03/2017 23:59 with a volume
of 22 (MSCF). The intermittent event lasted for 133 minutes and was due to low gas rates to the LP
compressor, causing flaring off of Vessel V-1 20A. The flaring event stopped when gas rates through the plant
were increased.
A flaring event occurred at GC1 starting at 07/07/2017 16:24 and stopping at 07/07/2017 17:26 with a volume
of 14583 (MSCF). The event lasted for 62 minutes and was due to high transit gas line pressure caused by
CGF compressor problems. The flaring event stopped when rates were reduced.
A flaring event occurred at GC1 starting at 07/13/2017 00:00 and stopping at 07/13/2017 23:59 with a volume
of 2720 (MSCF). The event lasted for 1439 minutes and was due to preparations for the upcoming Turn
Around (TAR) . The flaring event stopped when preparation activities were completed.
A flaring event occurred at GC1 starting at 07/14/2017 00:00 and stopping at 07/14/2017 23:59 with a volume
of 11620 (MSCF). The event lasted for 1439 minutes and was due to blowing down the facility for TAR . The
flaring event stopped when the blowdown was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jennifer. blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000031
Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
August -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Q
Pool Name PoolCode Percent
7. Reinjected
O
PRUDHOE 640150 98.42%
LISBURNE 640144 0.34%
8. Flared or vented 1 hour or less
1,638
MIDNIGHT SUN 640158 0.08%
PT MCINTYRE 640180 1,16%
9. Flared or vented more than 1 hour (see instr.)
50,779
10. Pilot and Purge
34,547
11. Assist Gas
U
12. Fuel gas used in lease operations.
493,398
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
G
MCF
lr7Z
14. TOTAL VOLUME (ITEMS 6-12)
580,362
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-32,655,350
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
LNote: All volumes must be corrected
Signature_ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/ temperature of 60o F. Authority 20
Printed Name Diane Colleyate
Phone (907) 564-5775 D
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
UATE
TIME
8/25/2017
1537-1634
8/26/2017
1727-1752
ACTION TAKEN TO ELIMINATE CAUSE
8/27/2017
1530-1603
See attachments
8/30/2017
0345-0411
Planned events greater than 1 hour
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -1
GAS FLARING INCIDENT REPORT
August 2017
IE DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
800 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
208
240
380
1,628
DESCRIPTION OF INCIDENT
See attachments
ACTION TAKEN TO E
See attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/10/2017 1821-1822
10 See attachments
See attachments
TOTAL
10
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/12-17/17 0729-2359
50,779 See attachments
See attachments
TOTAL
50,779
TOTAL
Unplanned Events < 1 Hour
1,628
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
10
exceeding 5,000 MCF
Planned Events > 1 hour or
50,779
exceeding 5,000 MCF
Pilot Purge
34,547
Assist
0
TOTAL FLARED VOLUME
86,964
Page 7
9/14/2017
4:31 PM
Flare Start Date 08/01/2017
Flare End Date 08/31/2017
GC1 Flare Report Total Volume (MSCF) 52417
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-321 Flare Relief 08/10/2017 6:21:00 pm
6:22:00 pm
1 min
No
No
Yes BP1 VONESCC
10
Determination Cause Depressured K-3320.
Action Taken K-3320 depressured.
Daily Volume (MSCF)
10
17-323 Flare Relief 08/12/2017 7:29:00 am
11:59:00 pm
990 min
Yes
No
Yes BPIUONESCC
6920
Determination Cause Post TARwarm-up.
Action Taken none
Daily Volume (MSCF)
6920
17-349 Flare Relief 08/13/2017 12:01:00 am
11:59:00 pm
1438 min
Yes
No
Yes BPITISHERCD
4680
Determination Cause Start-up after TAR
Action Taken none
Daily Volume (MSCF)
4680
17-327 Flare Relief 08/14/2017 12:00:00 am
11:59:00 pm
1439 min
Yes
No
Yes 3P1\KIRSCHW
26000
Determination Cause tar
Action Taken tar
Daily Volume (MSCF)
26000
17-331 Flare Relief 08/15/2017 12:00:00 am
11:59:00 pm
1439 min
Yes
No
Yes BPIIKIRSCHW
11600
Determination Cause start-up
Action Taken planned start-up
Daily Volume (MSCF) 11600
17-348 Flare Relief 08/16/2017 12:01:00am M59:00pm 1438 min Yes No Yes BPt\FISHERCD 790
Determination Cause Start-up activities after TAR
Action Taken none
Daily Volume (MSCF) 790
17-335 Flare Relief 08/17/2017 12:00:00 am 11:59:00 pm 1439 min Yes Yes Yes BPIIKIRSCHW 789
Determination Cause start-up
Action Taken none start-up
Generated 09/06/2017 4:06:25PM
Daily Volume (MSCF) 789
Page 8 of 11
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, September 14, 2017 9:30 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Events at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc reporting@alaska.gov Victoria. loepp(a alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GCI starting at 08/12/2017 07:29 and continuing on to the next day with a volume
of 6920 (MSCF) on 08/12/2017. The event lasted for 990 minutes and was due to post TAR warm-up. The
flaring even continued into 08/13/2017.
A flaring event occurred at GCI continuing from the previous day, 08/12/2017, and continuing on into the next
day 08/14/2017. Starting at 00:00 08/13/2017 and stopping at 23:59 08/13/2017 the volume for the day
was 4680 (MSCF). The event lasted for 1439 minutes and was due to Start-up after TAR. The flaring event
continued into the next day.
A flaring event occurred at GCI continuing from the previous day, 08/13/2017, and carrying on to the following
day. The volume for 08/14/2017 was 26000 (MSCF). The event lasted for 1439 minutes on 08/14/2017 and was
due to re -pressurization and post TAR startup. The flaring event continued into the next day.
A flaring event occurred at GCI continuing from the previous day, 08/14/2017, and carrying on to the following
day. The volume for 08/15/2017 was 11600 (MSCF). The event lasted for 1439 minutes on 08/15/2017 and
was due to post TAR startup. The flaring event continued into the next day.
A flaring event occurred at GCI continuing from the previous day, 08/15/2017, and carrying on to the following
day. The volume for 08/16/2017 was 790 (MSCF). The event lasted for 1439 minutes on 08/16/2017 and was
due to post TAR startup. The flaring event continued into the next day.
A flaring event occurred at GCI continuing from the previous day, 08/16/2017, and stopping at 08/17/2017
23:59 with a volume of 789 (MSCF). The event lasted for 1439 minutes and was due to post TAR startup. The
flaring event stopped when post TAR startup activities were completed
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
I Se tember-2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
O
PRUDHOE 640150 96.997/6
LISBURNE 640144 0.37%
8. Flared or vented 1 hour or less
140
MIDNIGHT SUN 640158 0.09%
PT MCINTYRE 640180 2.55%
9. Flared or vented more than 1 hour (see instr.)
699,139
10. Pilot and Purge
53,529
11. Assist Gas
0
12. Fuel gas used in lease operations.
676,091
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr
�(
Safety
6qa r3s
MCF
14. TOTAL VOLUME (ITEMS 6-12)
1,428,899
Lease use
MCF
15. NGL Gas Equivalent
O
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0
P 3-1�-1'8
Commissioner Date
18. Transferred to: (Express as a negative # CGF
( p 9 )
-52,633,276
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
,(% l///'''��I9lrL�,n�' Note: All volumes must be corrected
Signature 'rV �-t c� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
//11 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Data r/
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE
9/20/2017
9/6-13/17
9/13/2017
9/29/2017
9/3/2017
9/4/2017
DATE
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
September 2017
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
1315-1316 10 Not required for unplanned events <= 1 hr
TOTAL 10
TIME
2043-2359
0520-2305
0911-1015
TOTAL
1943-1948
2043-2054
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
698,419 See attachments
660
60
699,139
70 See attachments
60
130
U
TOTAL
10
699,139
130
0
53,529
0
752,808
DESCRIPTION OF INCIDENT
See attachments
Not required for unplanned events <= 1 hr
See attachments
See attachments
See attachments
Page 6
10/12/2017
2:33 PM
Flare StartDate 09/01/2017
Flare End Date 09/30/2017
GC1 Flare Report
Total Volume (MSCF) 699279
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-352 Flare Relief 09/03/2017 7:43:00 pm 7:48:00 pm 5 min No
Determination Cause Startup K-7000 after water wash
Action Taken Flaring stopped once compressor was online
17-353 Flare Relief 09/04/2017 8:43:00 pm 8:54:00 pm 11 min No
Determination Cause Startup K-7001 after water wash
Action Taken Flaring stopped once compressor was online
17-355 Flare Relief 09/06/2017 8:43:00 on 11:59:00 pm 196 min Yes
Determination Cause Fouled Odd/Even TEG regeneration system
Action Taken None at this time -awaiting pans
No Yes BP7\SHELT1 70
Daily Volume (MSCF) 70
No Yes BP1\SHELTI 60
Daily Volume (MSCF) 60
No No BP11SPRINGG 3760
Daily Volume (MSCF) 3760
17-356 Flare Relief 09/07/2017 12:00:00 am 12:00:00 am 1440 min Yes No No BP1 ZPRINGG 87150
Determination Cause Fouled Odd/Even TEG regeneration system
Action Taken None at this time -awaiting parts
Daily Volume (MSCF) 87150
17-357 Flare Relief 09/08/2017 12:00:00 am 12:00:00 am 1440 min Yes No No BPIISPRINGG 172630
Determination Cause Fouled Odd/Even TEG regeneration system
Action Taken None at this time -awaiting parts
17-359 Flare Relief 09/09/2017 12:00:00 am 12:00:00 am 1440 min Yes
Determination Cause Fouled Odd/Even TEG regeneration system
Action Taken None at this time -awaking parts
Daily Volume (MSCF) 172630
No No 3P1\SPRINGG 181530
17-360 Flare Relief 09/10/2017 1200:00 am 12:00:00 am 1440 min Yes No
Determination Cause Fouled Odd/Even TEG regeneration system
Action Taken None at this time -awaiting parts
17-362 Flare Relief 09/11/2017 12:00:00 am 12:00:00 am 1440 min Yes
Determination Cause Fouled Odd/Even TEG regeneration system
Action Taken None at this time -awaiting parts
Daily Volume (MSCF) 181530
No BP1\SPRINGG 116110
Daily Volume (MSCF) 116110
No No BP1\SPRINGG 86750
17-363 Flare Relief 09/12/2017 1200:00 am 3:30:00 pm 930 min Yes No
Determination Cause Fouled Odd/Even TEG regeneration system
Action Taken None at this time -awaiting parts
Daily Volume (MSCF) 86750
No BP1\SPRINGG 48010
Daily Volume (MSCF) 48010
17-365 Flare Relief 09/13/2017 12:00:00 am 11:59:00 pm 1439 min Yes Yes No BP1 WRINGG 2479
Determination Cause fouled TEG system causes condensate laden assist gas leading to black smoke events
Action Taken repairing reboilers , lowered rates
17-365 Flare Relief 09/13/2017 5:20:00 am 11:05:00 pm 1065 min Yes No No BP1\SPRINGG 660
Generated 10/02/2017 2:13:02PM Page 4 of 8
Flare Start Date 09/01/2017
Flare End Date 09/30/2017
Determination Cause Fouled Odd/Even TEG regeneration system
Action Taken None at this time -awaiting parts
Daily Volume (MSCF) 3139
17-388 Flare Relief 09/29/2017 9:11:OOam 10:15:00am 84min No No No 8P7\SHELTI 80
Generated 10/02/2017 2:13:02PM Page 5 of 8
Flare Start Date 09/01/2017
Flare End Date 09/30/2017
Determination Cause Flared off V-136, due to K-108 going down on a high temp on the gas/gas exchanger
Action Taken The other gas/gas exchanger was opened up to lower gas temperature, allowing K-108 to be put back online and stop nanng off V-136
Daily Volume (MSCF) 60
Total Volume (MSCF) 699279
Generated 10/02/2017 2:13:02PM Page 6 of 8
Link, Liz M (DOA)
From:
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Wednesday, October 11, 2017 1:56 PM
To:
AOGCC Reporting (DOA sponsored)
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Borton, Kim;
Cc:
AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
AK, HSSEE Env Adv West;
Buckbee, Rachel A
Subject:
Flaring Events at GC1
Follow Up Flag: Follow up
Flag Status: Flagged
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoqcc.rel)orting@alaska.gov Victoria Ioepp(d)alaskagov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GCI starting at 09/06/2017 20:43 and continuing to 09/13/2017. Daily volumes and
durations are summarized below. The event was due to fouling of the Odd and Even TEG regeneration systems.
The event continued while the Operations and Maintenance teams were troubleshooting interim mitigations to
the fouling while waiting for permanent repair parts. The flaring event stopped on 09/13/2017 when the odd
reboiler fouling was cleared and throughput was kept at reduced rates while the even reboiler was waiting parts
for permanent repair.
• 09/06/2017: volume of 3760 (MSCF). Duration of 196 minutes. Start time 20:43 and continues through
09/12/2017
• 09/07/2017: volume of 87150 (MSCF). Du• ration of 1440 minutes.
09/08/2017: volume of 172630 (MSCF). Duration of 1440 minutes.
• 09/09/2017: volume of 181530 (MSCF). Duration of 1440 minutes.
09/10/2017: volume of 116110 (MSCF). Duration of 1440 minutes.
• 09/11/2017: volume of 86750 (MSCF). Duration of 1440 minutes.
• 09/12/2017: volume of 48010 (MSCF). Duration of 930 minutes. Start time 00:00, stop time 15:30.
• 09/13/2017: volume of 2479 (MSCF). The event lasted for 1440 minutes. The event started at 00:00 and
ended at 23:59.
A flaring event occurred at GCI starting at 09/29/2017 09:11 and stopping at 09/29/2017 10:15 with a volume
of 60 (MSCF). The event lasted for 64 minutes and was due to the HP Compressor, K-108, tripping offline due
to high temp on the gas/gas exchanger. The flaring event stopped when the second gas/gas exchanger was
opened up to lower gas temperatures allowing K-108 to be restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRMI IrFn me n1cDnQ1T1nK1
1. Facility Number 2. Facility Name
0290000031 PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
WW ... Wils
4. Operator 5. MonthNear of Disposition
BP October -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Code Percent
7. Reinjected
O
640150 97.10%
640144 0.28 %
8. Flared or vented l hour or less
6,499
WMIDNIGHTSUN640158 0.11%
640180 2.51%
9. Flared or vented more than 1 hour (see instr.)
4,280
10. Pilot and Purge
58,403
11. Assist Gas
0
12. Fuel gas used in lease operations.
736,970
13. Other (see instructions)
Official Use Only
Authorization 11 hr:
P/0
Safety
u 1�
f
MCF
14. TOTAL VOLUME (ITEMS 6-12)
806,152�
Lease Use
MCF
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0
Commissioner 7 Date
18. Transferred to: (Express as a negative #) CGF 4L:6:5.169,166
19, Remarks:
I hereby cattily that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley- temperature of 60o F. Authority 20
Phone (907) 564-5775 Date
AAC25 2
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
wor q mj ale lq•jaI!uuaf
bOZ9-0£S (L06) IIaJ
9Z6S-b9S (L06) a:)IHO
peal weal uo!lez!w!ldo uo!lonpoad 003
ar1e iaf!uuar
`sTMq.L
'Ino sem uoilonpoid uagm paddols Juana 8ui.zeU 3141 'pie3 D -Id e ql[m paJetoosse malgozd a 3o asne0aq
umop Outlings OOOL-N .lossaldmoD Sd7 of anp sem pue salnuim 06 IQJ palsel Juana aql '(JDSW) 000V 30
amnion e grim 0£ bi LIOZ/6Z/OI ie $utddols pue 00 £i LIOZ/6Z/OI le OUTLleIS 100 It paim000 Juana 8utieli d
'Ino
sem umimpozd uogm paddols Iuana aq1 'amssa.id auil IisueiJ g2ig SuiltIon auill3o guiddiii `ZO8I `iossaadwoo
.talsooq s, jgo of anp sem puu (dDSW) 0005 uegl jaiewO 3uml0n e peq Juana 3ql '(JDSW) 66b930
auznion e Pm Ob:00 L I OZ/£Z/O I it, 8uiddols pue 0000 L I OZ/£Z/0l It Outuels 109 it p3zzn00o Iuana 2UIJBO V
'pasea.loap amssawd auil J[sueal uagm paddols Juana 8utIeli aq1 'Jualltuzzalui sem
Juana 8uiaeg agl aznssazd auil JisuezI g3iq of anp sem put solnuim b££ JOJ palsel Juana aql '(IDSW) 08Z 30
auznlon e glim LZ:9I LIOZ/ZI/OI ie 8uiddols pue £5:60 LIOZ/ZI/OI it Sufueis log ie pazin00o Juana $utzed V
npeaZ meal uoilezimildo uotlonpozd gag `axelg ia31uuaf :moz3
A0b e>Isele ao1'euol0in no 'e>IseJe u!lao ar00 oV
00J0V'ddaoj euolo!n :00 6u!laodaa OOJOV Ol
LDJ le sluan3 6uue13 :hafgns
V la40ed'aagjOne
:u!goa 'Janolg'WSO L09 SdO ')IV 'll0 41!1!Oed L D9 SdO ')IV 'lsaM APV ^u3 33SSH 'SIV
:w!N 'uolJoa :3 JaI!uuaf'j:)jelS'tio6ajg 'anglJV :V ijeO'uosu98'(VOO) 1 eu0l0!A'ddao-1
(paaosuods Vo(]) 6u!liodaa »JOV :ol
WV 90:8 LLOZ'LE aagol00'Aepsanl :luas
<wo0'dgpn 310030JdSdO)IV> 11003poadsdo)IV :woz j
Woo) W ziq ')lull
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
October 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/23/2017 0000-0040 6,499 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 6,499
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/12/2017 0953-1527 280 See attachments See attachments
10/29/2017 1300-1430 4,000
TOTAL 4,280
events less than or equal to 1 hour
I IML VOLUME DESCRIPTION OF IN
See attachments
TOTAL 0
TIME VOLUME DESCRIPTION OF INCIDENT &
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE
See attachments
See attachments
CAUSE
Page 7
11/13/2017
9:27 AM
TOTAL
Unplanned Events < 1 Hour
6,499
Unplanned Events > 1 Hour
4,280
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
58,403
Assist
0
TOTAL FLARED VOLUME
69,182
ACTION TAKEN TO ELIMINATE
See attachments
See attachments
CAUSE
Page 7
11/13/2017
9:27 AM
Flare Start Date 10/0112017
Flare End Date 10/3112017
GCI Flare Report Total Volume (MSCF) 10779
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-393 Flare Relief 10/12/2017 9:53:00 am 3:27:00 pm 334 min Yes No No 8PI6SPRMGG 280
Determination Cause High gastransit line pressure
Action Taken No response taken as this was deemed to be of short duration
Daily Volume (MSCF) 280
17417 Flare Relief 10/29/2017 1:00:00 pm 2:30:00 pm 90 min No No No BPIIDELATI 4000
Determination CaUSe LPS compressor K-7000 shut down because of a problem associated with PLC card
Action Taken WOA reduced production rates and shut-in 7 wells equaling e5mmscfd. Wells were shut-in or choked back starting at 13:00houm.
Daily Volume (MSCF) 4000
Total Volume (MSCF) 10779
Generated 11/03/2017 1:17:48PM Page 7 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2 Facility Name
PIB GC 1
3. Field
PBU - WOA
4. Operator
BP
5. Monlh/Year of Disposition
November -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 97.28%
LISBURNE 640144 0.28%
8. Flared or vented l hour or less
293
MIDNIGHTSUN 640158 0.09%
PT MCINTYRE 640180 2.35%
9. Flared or vented more than 1 hour (see instr.)
10
10. Pilot and Purge
54,787
11. Assist Gas
0
12. Fuel gas used in lease operations.
876,764
13. Other (see instructions)
0
Official Use Only
Au
Authorization hr
's a
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
931,854
Lease Use
10
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner[—µ— !Date
18. Transferred to: (Express as a negative #) CGF
-63,200,411
19. Remarks:
I hereby certify that thg foregoing is truecorrect to the best of my knowledge.
/v( )lJ Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 Asia and to a
Printed Name Diane Colley Phone (907) 584-5775 Date /W -7 temperature of 60o F. Authority 20
AAC25 235
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
November 2017
unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/2/2017 0653-0705 1 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
11/20/2017 1626-1636 42
TOTAL 43
See attachments
See attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/3/2017 1950-2015 250 See attachments See attachments
TOTAL 250
11/6/2017 1940-2400
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 NICE
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
FLUME DESCRIPTION OF IN
10 See attachments
10
TOTAL
43
0
250
10
54,787
0
55,090
ACTION TAKEN TO I
See attachments
Page 6
12/13/2017
9:07 AM
Flare Start Date 11/01/2017
Flare End Date 11/30/2017
GC1 Flare Report
Total Volume (MSCF) 3C3
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-419 Other 11/03/2017 7:50.00 pm 8:15:00 pm 25 min No
Determination Cause Start-up GTRB-51-3220
Action Taken Sustained ignition.
17-421 Flare Relief 11/06/2017 7:40:00 pm 12:00:00 am 260 min Yes
Determination Cause SwappedlPcompressomforPMwork
Action Taken none
No Yes BPIWONESCC 250
No
Daily Volume (MSCF) 250
Daily Volume (MSCF) 10
Total Volume (MSCF) 303
Generated 12/06/2017 9:22:30AM Page 5 of 6
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, December 18, 2017 3:59 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; Borton, Kim;
AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Glover, Robin;
Buckbee, Rachel A
Subject: Flaring Events at GC1
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting (c)alaska.gov Victoria. loepp(o)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GCI starting at 11/06/2017 19:40 and stopping at 11/07/2017 24:00 with a volume
of 10 (MSCF). The event lasted for 260 minutes and was due to swapping IP compressors for PM work. The
flaring event was intermittent. The flaring event stopped when the swap was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FAMI ITV RDDnDT nr nmr%r%i
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -1
GAS FLARING AND VENTING INCIDENT REPORT
December 2017
---u avcrnts less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CA75E
12/26/2017 0930-1007 210 Not required for events <= 1 hr
TOTAL 210
Wt�LKIPTION OF INCIDENT & CAUSE
12/7-10/2017 2230-1440 1,825 "Cold Venting" when 42" flare line lost flame
12/14/2017 1225-2325 1,406 "Cold Venting" when 42" flare line lost flame
TOTAL 3,231
12/3/2017 2216.2236 Ut INLIDENT & CAUSE
12/30/2017 750 Not required for events <= 1 hr
1950-1955 30
TOTAL 780
Hoed events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
TOTAL
210
Unplanned Events > 1 Hour
3,231
Planned Events < 1 hour and not
exceeding 5,000 MCF
780
Planned Events > 1 hour or
exceeding 5,000 MCF
0
Pilot Purge
778,811
Assist
0
TOTAL FLARED VOLUME
783,032
Not required for events <= 1 hr
Attempting to re -light flare and establish flame
Attempting to re -light flare and establish flame
Not required for events <= 1 hr
See attachments
Page 7
1/12/2018
9:58 AM