STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAR DiRpnSiTinN
1. Facility Number2.
0290000032
Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
Janua -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent o/
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 94,74%
AURORA 640120 1.29
B. Flared or vented lhour or less
53
BOREALIS 640130 2.46%
ORION 640135 1.03
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.48
10. Pilot and Purge
36,552
11. Assist Gas
0
12. Fuel gas used in lease operations.
696,718
13. Other (see instructions)
Official Use Only
Authorization hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
733,323
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-21,436,675
Commissioner Date
19. Remarks:
I hereby certify thatt foregoing is true and correct to the best of my knowledge.
MNate: All volumes must be corrected
Signature_ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date ' C AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
events less than or equal to 1 hour
TOTAL
n
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
January 2017
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
See Attachments
See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/18/2017 0739-0743 53 See Attachments See Attachments
TOTAL 53
Planned events greater than 1 hour
DESCRIPTION OF INI
See Attachments
TOTAL
A
See Attachments
Page 7
2/12/2017
5:13 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
53
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
36,552
Assist
0
TOTAL FLARED VOLUME
36,605
See Attachments
Page 7
2/12/2017
5:13 PM
Flare Start Date 01/01/2017
Flare End Date 01/31/2017
GC2 Flare Report Total Volume (MSCF) 53
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-21 Flare Relief 01/18/2017 7:39:00 am 7:43:00 am 4min No No Yes BPI\LEGNJB 53
Determination Cause Trouble shooting possible Flare line freeze blockage.
Action Taken No response taken as this was deemed to be of short duration.
Daily Volume (MSCF) 53
Total Volume (MSCF) 53
Generated 02/02/2017 11:09:42AM Page 7 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODucFD [,oS n1c9)nQ1T1nK1
1. Facility Number 2. Facility Name
0290000032 PEI GC 2
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonlhNear of Disposition
BP I February -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 95.70%
AURORA 640120 1.24%
8. Flared or vented 1 hour or less
119
BOREALIS 640130 2,09%
ORION 640135 0.54%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0,43%
10. Pilot and Purge
31,154
11. Assist Gas
0
12. Fuel gas used in lease operations.
659,696
13. Other (see instructions)
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
690,969
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-19,344,032
19. Remarks:
I hereby certify that the foregoing its true and correct to the best of my knowledge.
0a%2(L 6 E���" Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date I AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -2
GAS FLARING INCIDENT REPORT
February 2017
events less than or equal to
vuwME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
TOTAL
Planned events less than or equal to 1 hour
0
See Attachments
See Attachments
DATE TIME
2/8/2017
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
1010-1038
119
See Attachments
See Attachments
TOTAL
119
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
119
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
31,154
Assist
0
TOTAL FLARED VOLUME
31,273
Page 9
3/15/2017
10:10 AM
Flare Start Date 02/012017
Flare End Date 02282017
GC2 Flare Report Total Volume (MSCF) 119
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-40 Flare Relief 02/08/2017 10:10:00 am 10:3800 am 28 min No No yes BP1\EVERDP 119
Determination Cause Depressure B SC to Bare for planned maintenance.
Action Taken Planned Vessel Depressure for maintenance
Daily Volume (MSCF) 119
Total Volume (MSCF) 119
Generated 03/0112017 3:11:04PM Page 9 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator •
BIP
5. Monthlyear of Disposition
March -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
Pool Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 95.17%
AURORA 640120 1.41%
8. Flared or vented l hour or less
832
BOREALIS 640130 2.46%
ORION 640135 0.53%
9. Flared or vented more than 1 hour (see instr.)
1,500
POLARIS 640160 0.43%
10. Pilot and Purge
28,833
11. Assist Gas
0
12. Fuel gas used in lease operations.
756,466
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
% j (� U
MCV T L-
14. TOTAL VOLUME (ITEMS 6-12)
787,631
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
S-
18. Transferred to: (Express as a negative #) CGF
-20,442,742
Commissioner Date
19. Remarks:
I hereby certify that the� foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date /�'/ AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -2
GAS FLARING INCIDENT REPORT
March 2017
unplanned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
3/8/2017 0408-0420
83 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
3/16/2017 2204-2214
7
TOTAL
90
Unplanned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
3/18/2017 1130-1430
1,500 See Attachments
See Attachments
TOTAL
1,500
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
3/26/2017 0319-0338
330 See Attachments
See Attachments
3/27/2017 2228-2301
412
TOTAL
742
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
TOTAL
90
1,500
742
0
28,833
0
31,165
See Attachments
See Attachments
Page 8
4/13/2017
10:32 AM
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, April 10, 2017 9:43 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM; Schinagl, Werner
Subject: Flaring Event at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc. report) n q CcDal3ska. gov Victoria. loeppaa.a laska. gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 03/18/2017 11:30 and stopping at 03/18/2017 14:30 with a volume of 1500
(MSCF). The event lasted for 180 minutes and was due to an unplanned stop production caused by a power interruption
to a critical PLC during a battery PM. The flaring event stopped when the plant was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Flare Start Date 03/01/2017
Flare End Date 03/31/2017
GC2 Flare Report Total Volume (MSCF) 2332
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-91 Flare Relief 03/18/2017 11:30:00 am 2:30:00 pm 180 min No No No BPI\EVERDP 1500
Determination Cause Flaring related GC2 unanticipated stop production shutdown, due to an unintended power interruption to critical PLC during battery PM.
Action Taken Plant restart
Daily Volume (MSCF) 412
Total Volume (MSCF) 2332
Generated 04/03/2017 4:36 08PM Page 7 of 7
Daily Volume (MSCF)
1500
17-95 Flare Relief 03/26/2017 3:1900 am 33800 am 19 min No No
Yes BPIIPAOLINJM
330
Determination Cause
Added assist gas to troubleshoot flare header pressure buildup, possible liquids or ice blockage.
Action Taken
Shut off Flare assist gas.
Daily Volume (MSCF)
330
17-97 Flare Relief 03/27/2017 10:28:00 pm 11:01:00 pm 33 min No No
Yes BPItPAOLINJM
412
Determination Cause
Troubleshooting flare header backpressure, opened assist gas to monitor pressure and fire.
Action Taken
Troubleshooting completed, assist gas shut off.
Daily Volume (MSCF) 412
Total Volume (MSCF) 2332
Generated 04/03/2017 4:36 08PM Page 7 of 7
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. Monthlyear of Disposition
I Aril -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 95.57%
AURORA 640120 1.17%
8. Flared or vented 1 hour or less
1 275
BOREALIS 640130 2.51%
ORION 640135 0.38%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.37%
10. Pilot and Purge
30,639
11. Assist Gas
0
12. Fuel gas used in lease operations.
773,023
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
604,937
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
_22,187,718
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
(� J temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 'j /�� AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
April 2017
4/7/2017 1443-1515
1,222 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
4/21/2017 1450-1455
53
TOTAL
1,275
Unplanned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
1,275
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
30,639
Assist
0
TOTAL FLARED VOLUME
31,914
Page 8
5/14/2017
2:06 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I May -2017
Disposition
VOlume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 95.21%
AURORA 640120 1.07%
B. Flared or vented lhour or less
2933
BOREALIS 640130 2.76%
ORION 640135 0.60%
9. Flared or vented more than 1 hour (see instr.)
2,926
POLARIS 640160 0.387/6
10. Pilot and Purge
26 962
11. Assist Gas
()
12. Fuel gas used in lease operations.
637,427
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
-7 �33
L
MCV,Th
14. TOTAL VOLUME (ITEMS 6-12)
670,248
Lease Use
MC
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
6
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-19,375,819
19. Remarks:
I hereby certify that hMe foregoing is trueandcorrect to the best of my knowledge.
/ -�_� Note: All volumes must be corrected
Signature l de -r Title Manager Production Taxes and Royalties Alaska to pressureof 14.65 psia and to a
C temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date Q AAC25.235.
6
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
May 2017
Lunplanneo events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/7/2017 0955-1030 1,823 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
5/27/2017 1535-1621 332
TOTAL 2,155
jUnplanned events greater than 1 hour
561 See Attachments
5/26/2017 1442-1708
861
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/18/2017
0306-0654
1,504
See Attachments
See Attachments
exceeding 5,000 MCF
TOTAL
1,504
1,422
exceeding 5,000 MCF
Pilot Purge
26,962
Assist
0
Planned events less than
or equal to 1 hour
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/5/2017
0918-0937
106
See Attachments
See Attachments
5/17/2017
1610-1710
433
5/17/2017
22492300
82
5/19/2017
2234-2245
82
5/20/2017
1430-1441
75
TOTAL
778
L4_TrFi9
5/19/2017 1237-1358
561 See Attachments
5/26/2017 1442-1708
861
TOTAL
1,422
TOTAL
Unplanned Events < 1 Hour
2,155
Unplanned Events> 1 Hour
1,504
Planned Events < 1 hour and not
778
exceeding 5,000 MCF
Planned Events > 1 hour or
1,422
exceeding 5,000 MCF
Pilot Purge
26,962
Assist
0
TOTAL FLARED VOLUME
32,821
See Attachments
Page i
6/18/2017
4:55 PM
Flare Start Date 05/0v2017
Flare End Date 0513V2017
GC2 Flare Report Total Volume (MSCF) 5859
Report
Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned ReportedEly Volume
17-141 Flare Relief 05/05/2017 9:18:00 am 9:37:00 am 19 min No No Yes BP1\SQUIP2 106
Determination Cause Shut down of LP 81P compressors required to install instrumentation jumper
Action Taken Restarted compressors when jumper installation completed
Daily Volume (MSCF) 106
17-174 Flare Relief 05/17/2017 4:10:00 pm
5:10:00 pm
60 min No
No
Yes BP"PONDSGL
433
Determination Cause K-7001 waterwash.
Action Taken Stopped water wash.
17-174 Flare Relief 05/17/2017 10:49:00 pm
11:00:00 pm
11 min No
No
Yes BP7\PAOLINJM
82
Determination Cause Started K7001 after water wash.
Action Taken K7001 started and Coppus starting
gas shut in.
Daily Volume (MSCF)
515
17-175 Flare Relief 05/18/2017 3:06:00 am
6:54:00 am
228 min No
No
No BP1\PONDSGL
1504
Determination Cause Spin cooling K-7000.
Action Taken Stopped spin cool.
Daily Volume (MSCF)
1504
17-177 Flare Relief 05/19/2017 12:37:00pm
1:58:00 pm
81 min No
No
Yes BPi\PONDSGL
561
Determination Cause K-7000 water wash.
Action Taken Stopped water wash.
17-177 Flare Relief 05/19/2017 10:34:00 pm
10:45:00 pm
11 min No
No
Yes BP1\PAOLINJM
82
Determination Cause Started K7000, Coppus gas to Flare
Action Taken K7000 started, starting Coppus gas
blocked in.
Daily Volume (MSCF)
643
17-178 Flare Relief 05/20/2017 2:30:00 pm
2:41:00 pm
11 min No
No
Yes BP1\PONDSGL
75
Determination Cause Starting K-7001.
Action Taken Start up complete.
Daily Volume (MSCF)
75
17-186 Flare Relief 05/26/2017 2:42:00 pm
5:08:00 pm
146 min No
No
Yes BP1\GILLSJ
861
Determination Cause Depressuring R -Pad for Maint.
Action Taken Finish Blowing down.
Daily Volume (MSCF)
861
Total Volume (MSCF)
5859
Generated 06/09/2017 2:22:08PM
Page 8 of 9
Link, Liz M (DOA)
From: Blake, Jennifer <Jennifer.Blake@bp.com>
Sent: Tuesday, June 13, 2017 2:16 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Borton, Kim; AK, HSSEE Env
Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2 Facility OTL; AK, OPS GC2
OSM; Schinagl, Werner; Dean, James A
Subject: Flaring Event at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reportingCa)alaska.gov Victoria. Ioepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 05/19/2017 12:37 and stopping at 05/19/2017 13:58 with a volume of 561
(MSCF). The event lasted for 81 minutes and was due the planned water wash on K-7000. The flaring event stopped
when water wash was completed.
A flaring event occurred at GC2 starting at 05/26/2017 14:42 and stopping at 05/26/2017 17:08 with a volume of 861
(MSCF). The event lasted for 146 minutes and was due to planned maintenance on R Pad. The flaring event stopped
when the depressurization of R Pad was complete.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office(907)564-5926
Cell(907)830-6204
Jennifer.blake@bp.com
Flare Start Date 05/0112017
Flare End Date 0 513 112 01 7
GC2 Flare Report Total Volume (MSCF) 5859
Report
Numbs System Date Start Time Stop Time
Duration Intermittent
Black Smoke Planned Reported By
Volume
17-141 Flare Relief 05/05/2017 9:18:00 am 9:37:00 am
19 min
No
No Yes BP7\SQUIP2
106
Determination Cause Shut down of LP & IP compressors required to install instrumentation jumper
Action Taken Restarted compressors when jumper installation completed
Daily Volume (MSCF)
106
17-174 Flare Relief 05/17/2017 4:10:00 pm 5:10:00 pm
60 min
No
No Yes BP1\PONDSGL
433
Determination Cause K-7001 water wash.
Action Taken Stopped water wash.
17-174 Flare Relief 05/17/2017 10:49:00 pm 11:00:00 pm
11 min
No
No Yes BP7\PAOLINJM
82
Determination Cause Started K7001 after water wash.
Action Taken K7001 started and Coppus starting gas shut in.
Daily Volume (MSCF)
515
17-175 Flare Relief 05/18/2017 3:06:00 am 6:54:00 am
228 min
No
No No BP1\PONDSGL
1504
Determination Cause Spin cooling K-7000.
Action Taken Stopped spin cool.
Daily Volume (MSCF)
1504
17-177 Flare Relief 05/19/2017 12:37:00 pm 1:58:00 pm
81 min
No
No Yes BP1\PONDSGL
561
Determination Cause K-7000waterwash.
Action Taken Stopped water wash.
17-177 Flare Relief 05/19/2017 10:34:00 pm 10:45:00 pm
11 min
No
No Yes BPI\PAOLINJM
82
Determination Cause Started K7000, Coppus gas to Bare
Action Taken K7000 started, starting Coppus gas blocked in.
Daily Volume (MSCF)
643
17-178 Flare Relief 05/20/2017 2:30:00 pm 2:41:00 pm
11 min
No
No Yes BP1\PONDSGL
75
Determination Cause Starting K-7001,
Action Taken Start up complete.
Daily Volume (MSCF)
75
17-186 Flare Relief 05/26/2017 2:42:00 pm 5:08:00 pm
146 min
No
No Yes BP7\GILLSJ
861
Determination Cause Depressuring R -Pad for Maint.
Action Taken Finish Blowing down.
Daily Volume (MSCF)
861
Total Volume (MSCF)
5859
Generated 06/09/2017 2:22:08PM
Page 8 of 9
Flare Start Date 05/01/2017
Flare End Date 05/31/2017
High gas transit line pressure. Flared off D 1st stage
17-185 Controlled Blowdoxn 05/29/2017 4:27:00 am 4:33:00 am 6 min No
Determination Cause GLT compressor K-3300 shut down/depressured for 1-12o wash
Action Taken depressured
17-185 Controlled Blowdown 05/29/2017 7:31:00 pm 7:41:00 pm 10 min No
Determination Cause Started up GLT 3300 after waterwash (PURGE)
Action Taken start-up complete
No
No
Yes BP1WRINGG 10
Daily Volume (MSCF) 100
Total Volume (MSCF) 14887
Generated 06/09/2017 2:22:08PM Page 7 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000032
Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
June -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name PoolCode Percent
7. Reinjected
O
PRUDHOE 640150 96.02%
AURORA 640120 0.47%
8. Flared or vented 1 hour or less
60
BOREALIS 640130 2.64%
ORION 640135 0.61%
9. Flared or vented more than 1 hour (see instr.)
81,197
POLARIS 640160 0.26%
10. Pilot and Purge
31,374
11, Assist Gas
0
12. Fuel gas used in lease operations.
555,849
13. Other (see instructions)
0Official
Use Only
Authorization>1 hr:
Safety
B y "�-
MCF
14. TOTAL VOLUME (ITEMS 6-12)
66$,480
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
6
/ /_ � _ /
/
18. Transferred to: (Express as a negative #) CGF
-14,804,406
Commissioner Date
19. Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
�,(M L&M, Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Ro Royalties Alaska to pressure of 14.65 psta and to a
Printed Name Diane Colleytemperature of 60o F. Authority 20 Phone (907) 564-5775 Date AAC25.235.
V'TL
/G/f-7//7-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
17il13
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
June 2017
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/24-30/2017 1200-2400 81,197 See Attachments See Attachments
TOTAL 81,197
DATE
6/5/2017
TIME
0715-0730
TOTAL
VOLUME DESCRIPTION OF INCIDENT & CAUSE
60 See Attachments
60
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Planned events greater than 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
81,197
Planned Events < 1 hour and not
60
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
31,374
Assist
0
TOTAL FLARED VOLUME
112,631
Page 9
7/18/2017
11'.37 AM
Flare Start Date 06/01/2017
Flare End Date 06/30/2017
Total Volume (MSCF) 81257
Generated 07/06/2017 2:44:22PM Page 10 of 10
GC2 Flare Report
Total Volume (MSCF)
81257
Report
Numbe System
Date StartTime Stop Time Duration Intermittent Black Smoke
Planned Reported By
Volume
17-197 Controlled Slowdown 06/05/2017 7:15:00 am 7:30:00 am 15 min No No
Yes BP1\EVERDP
60
Determination Cause
A Bank rat stage separator depressured during a planned A bank outage for maintenance.
Action Taken
Planned separator depressure
Daily Volume (MSCF)
60
17-222 Flare Relief 06/24/2017 12:00:00 pm 12:00:00 am 720 min No No
No BP1\SQUIP2
12500
Determination Cause
Power failure caused a facility stop production. IP compressor problems during attempted restart
Action Taken
Troubleshooting IP compressors
Daily Volume (MSCF)
12500
17-228 Flare Relief 06/25/2017 12:00:00 am 4:00:00 pm 960 min No No
No BP1\SQUIP2
16667
Determination Cause
IP compressors won't run, suspected balance drum problems. Overhaul crew scheduled for repair
Action Taken
Shut in plant to stop flaring.
17-228 Flare Relief 06/25/2017 4:00:00 pm 12:00:00 am 480 min No No
No BP1\SQUIP2
533
Determination Cause
Flaring water tank vent gas. All other gas production shut in
Action Taken
Overhaul crew is scheduled to repair IP compressor. Plant to remain down until flaring far production is not necessary.
Daily Volume (MSCF)
17200
17-230 Flare Relief 06/26/2017 12:00:00 am 12:00:00 am 1440 min No No
No BP1\SQUIP2
6017
Determination Cause
Flaring water tank vent gas. All other gas production shut in
Action Taken
Overhaul working to repair IP compressor. No flaring for production, all plant production shut in
Daily Volume (MSCF)
6017
17-233 Flare Relief 06/27/2017 12:00:00 am 12:00:00 am 1440 min No No
No BP1\SQUIP2
7740
Determination Cause
Flaring water tank vent gas. All other gas production shut in
Action Taken
Overhaul working to repair IP compressor. No flaring for production, all plant production shut in
Daily Volume (MSCF)
7740
17-236 Flare Relief 06/28/2017 12:00:00 am 12:00:00 am 1440 min No No
No BP11,STEWARD
7740
Determination Cause
Plant down Flaring Produced Water Tank Vent system
Action Taken
IP compressor repairs ongoing
Daily Volume (MSCF)
7740
17-237 Flare Relief
06/29/2017 12:00:00 am 12:00:00 am 1440 min No No
No BP1\STEWARD
15000
Determination Cause
plant down flaring PW tanks vent system with addition assist gas to prevent black smoke
Action Taken
IP repairs ongoing
Daily Volume (MSCF)
15000
17-238 Flare Relief
06/30/2017 12:00:00 am 12:00:00 am 1440 min No No
No BP1\STEWARD
15000
Determination Cause
No IP/LP gas compression available. Flaring PW Tank vent system with assist gas to prevent black smoke
Action Taken
Repairsongomng
Daily Volume (MSCF)
15000
Total Volume (MSCF) 81257
Generated 07/06/2017 2:44:22PM Page 10 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I July -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 96.29%
AURORA 640120 0.73%
8. Flared or vented 1 hour or less
2,855
BOREALIS 640130 2.06%
ORION 640135 0.73%
9. Flared or vented more than 1 hour (see instr.)
65,500
POLARIS 640160 0.193%
10. Pilot and Purge
34,327
11. Assist Gas
0
12. Fuel gas used in lease operations.
608,615
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
cJ 5-0O
MCF V
14. TOTAL VOLUME (ITEMS 6-12)
711,297
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
�/ J —I
�O
18. Transferred to: (Express as a negative #) CGF
-20,476,193
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
���� a/)Q�/,1, Note: All volumes must be corrected
Signature ��ww��ee Title Mana er Production Taxes an Ro alties Alaska to pressure Of 14.65 psia and to a
I I t I temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date Y'
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
July 2017
Page 11
URIC IIMt
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/6/2017 1624-1705
1,188
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
7/29/2017 1850-1905
1,667
TOTAL
2,855
Unplanned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/1-3/2017 0000-1313
60,500
See Attachments
See Attachments
7/29/2017 1905-2105
5,000
TOTAL
65,500
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
2,855
Unplanned Events > 1 Hour
65,500
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
34,327
Assist
0
TOTAL FLARED VOLUME
102,682
8/13/2017
3:49 PM
Link, Liz M (DOA)
From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Wednesday, July 26, 2017 2:10 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Borton, Kim; AK, HSSEE Env
Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2 Facility OTL; AK, OPS GC2
OSM; Starck, Jennifer L
Subject: Flaring Event at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting(a)alaska.gov Victoria. Ioepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 06/24/2017 12:00 and continuing on into 06/25/2017 with a volume of 12500
(MSCF). The event lasted for 720 minutes and was due to a power failure that resulted in a facility Stop Production and
subsequent difficulties restarting the IP compressors. The flaring event continued into the next day while operations
and maintenance were troubleshooting the problem.
A flaring event occurred at GC2 starting at 06/25/2017 00:00 and stopping at 06/25/2017 16:00 with a volume of 16667
(MSCF). The event lasted for 960 minutes and was due to flaring LP/IP gas while ops and maintenance continued to
troubleshoot the IP compressors. The flaring event stopped when the plant was shut-in while the Overhaul crew was
mobilizing.
A flaring event occurred at GC2 starting at 06/25/2017 16:00 and stopping on 07/03/2017 at 13:13. The daily volumes
and durations are summarized below. The event was due to flaring water tank vent gas (all other gas production was
shut-in) while the overhaul crew was working on the IP compressors. Between 06/29 and 07/03, flare volumes
increased due to the addition of assist gas to prevent black smoke events. The event stopped on 07/03/2017 when the
compressors were repaired and placed back in service.
• 06/25/2017:
volume
of 533 (MSCF) and duration of 480 minutes.
• 06/26/2017:
volume
of 6017 (MSCF) and duration of 1440 minutes
• 06/27/2017:
volume
of 7740 (MSCF) and duration of 1440 minutes
• 06/28/2017:
volume
of 7740 (MSCF) and duration of 1440 minutes
• 06/29/2017:
volume
of 15000 (MSCF) and duration of 1440 minutes
• 06/30/2017:
volume
of 15000 (MSCF) and duration of 1440 minutes
• 07/01/2017:
volume
of 24000 (MSCF) and duration of 1440 minutes
• 07/02/2017:
volume
of 24000 (MSCF) and duration of 1440 minutes
• 07/03/2017:
volume
of 12500 (MSCF) and duration of 793 minutes
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jen nifer.blake@bp.com
Flare Start Date 0 710 1/201 7
Flare End Date 07/31/2017
GC2 Flare Report Total Volume (MSCF) 68355
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-240 Flare Relief 07/01/2017 12:00:00 am 12:00:00am 1440min No No No BPI\STEWARD 24000
Determination Cause LP/IP produced gas, PW tank vent system & additional assist gas to control black smoke
Action Taken IP compressor repairs ongoing
17-303 Flare Relief 07/29/2017 7:05:00 pm 9:05:00 pm 120 min No No
Determination Cause LPS compressor K-7000 shut down because of a problem associated with control issues
Action Taken Replaced card restarted K-7000
No BP1\EARLLC 5000
Daily Volume (MSCF). 6667
Total Volume (MSCF) 68355
Generated 08/15/2017 1:28:23PM Page 15 of 15
Daily Volume (MSCF)
24000
17-242 Flare Relief 07/02/2017 12:00:00 am 12:00:00 am 1440 min No No
No BP1\STEWARD
24000
Determination Cause
LP/IP produced gas, PW tank vent system & additional assist gas to control black smoke
Action Taken
IP gas compression repairs on going
Daily Volume (MSCF)
24000
17-244 Flare Relief 07/03/2017 12:00:00 am 1:13:00 pm 793 min No No
No BPI\STEWARD
12500
Determination Cause
IF compressor problem resulting in flared IP/LP production gas, PW tank vent gas & assist gas as needed to prevent black smoke
Action Taken
IP/LP compressors repaired and put in servoice
Daily Volume (MSCF)
12500
17-303 Flare Relief 07/29/2017 7:05:00 pm 9:05:00 pm 120 min No No
Determination Cause LPS compressor K-7000 shut down because of a problem associated with control issues
Action Taken Replaced card restarted K-7000
No BP1\EARLLC 5000
Daily Volume (MSCF). 6667
Total Volume (MSCF) 68355
Generated 08/15/2017 1:28:23PM Page 15 of 15
Link, Liz M (DOA)
From: Blake, Jennifer 1 <Jennifer.Blake@bp.com>
Sent: Friday, August 25, 2017 3:51 PM
To: AKOpsProdEOCTL; AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Borton, Kim; AK, HSSEE Env
Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2 Facility OTL; AK, OPS GC2
OSM; Starck, Jennifer L
Subject: Flaring Event at GC2
Follow Up Flag: Follow up
Flag Status: Flagged
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc. reporting(d?alaska.gov Victoria. loepp(5alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 07/29/2017 19:05 and stopping at 07/29/2017 21:05 with a volume of 5000
(MSCF). The event lasted for 120 minutes and was due to LPS compressor K-7000 shutting down because of a problem
associated with control issues. The flaring event stopped when a card was replaced and K-7000 was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facilily Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
August -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 95.71°
AURORA 640120 1.25%
8. Flared or vented 1 hour or less
3,137
BOREALIS 640130 2.24
ORION 640135 0.61°/
9. Flared or vented more than 1 hour (see instr.)
3,646
POLARIS 640160 0.19%
10. Pilot and Purge
36,694
11. Assist Gas
0
12. Fuel gas used in lease operations.
671,404
13. Other (see instructions)
0Official
Use Only
Authorization hr:
Safety
3� ^ /
MCF V,rL
14. TOTAL VOLUME (ITEMS 6-12)
714,881
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
/ /—
Commissioner 11-6
Data
18. Transferred to: (Express as a negative #) CGF
-22,557,273
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature_ CAN Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 9
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
8/14/2017
8/14/2017
8/15/2017
8/27/2017
TIME
2024-2117
2238-2256
0031-0044
1546-1600
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
August 2017
18 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
6
5
243
272
DESCRIPTION OF INCIDENT
See Attachments
ACTION TAKEN TO F
See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/9/2017 0120-0215 2,865 See Attachments See Attachments
TOTAL 2,865
8/25/2017
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0140-0250
TOTAL
IE DESCRIPTION OF INCIDENT &
3,646 See Attachments
TOTAL
272
0
2,865
LIM, R
36,694
0
43,477
ACTION TAKEN TO E
See Attachments
Page 8
9/14/2017
4:31 PM
Flare Start Date 08/01/2017
Flare End Date 08/31/2017
GC2 Flare Report Total Volume (MSCF) 6783
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
17-314 Flare Relief 08/09/2017 1:20:00 am 2:15:00 am 55 min No No Yes BPt\WALLC7 2865
Determination Cause De -pressured J Pad thru D Bank Slug Catcher for maint.
Action Taken Closed Flare when de-pressunng complete
Daily Volume (MSCF) 2865
17-342 Controlled Blowdown 06/25/2017 14000 am 2:50:00 am 70 min No No Yes BP1GSTEWARD 3646
Determination Cause Blow down "M" pad for maintenance. Volume of gas was slugcatcher, M LDF and M pad piping
Action Taken Closed Flare when blow down for maintenance complete
Daily Volume (MSCF) 3646
Total Volume (MSCF) 6783
Generated 09/06/2017 4:06:25PM Page 10 of 11
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, September 14, 2017 10:33 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Borton, Kim; AK, HSSEE Env
Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2 Facility OTL; AK, OPS GC2
OSM; Starck, Jennifer L
Subject: Flaring Events at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc reporting(dalaska.gov Victoria. loepp(o)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 08/25/2017 01:40 and stopping at 08/25/2017 02:50 with a volume of 3646
(MSCF). The event lasted for 70 minutes and was due to depressurizing "M" pad for maintenance through the facility
slug catcher to flare. The flaring event stopped when depressurization was complete.
A flaring event occurred at GC2 starting at 09/13/2017 16:54 and stopping at 09/13/2017 18:09 with a volume of 562
(MSCF). The event lasted for 75 minutes and was due to spin cooling the LPS compressor K-7000 Fall Water Wash. The
flaring event stopped when the water wash was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
September -2017
Disposition
Volume MCF
20. Forpmduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 94.96%
AURORA 640120 1.08%
8. Flared or vented 1 hour or less
991
BOREALIS 640130 2.96%
ORION 640135 0.63%
9. Flared or vented more than 1 hour (see instr.)
562
POLARIS 640160 0.37%
10. Pilot and Purge
33,999
11. Assist Gas
0
12. Fuel gas used in lease operations.
559,292
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
,�((�$
Safety
-
MCF
14. TOTAL VOLUME (ITEMS 6-12)
594,844
Lease Use
C C Z
✓ V
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
p
Commissioner !Date
18. Transferred to: (Express as a negative #) CGF
-18,959,012
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
OM 4 Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 Asia and to a
/ teperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 mDate AA C25 235
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
September 2017
i irvic
VULUNR U[SLKIPIIUN OF INLIUENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/16/2017 0256-0317
284 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
9/16/2017 1139-1203
317
TOTAL
601
Unplanned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned events less than Or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/9/2017 1542-1634
390 See Attachments
See Attachments
TOTAL
390
Planned events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/13/2017 1654-1809
562 See Attachments
See Attachments
TOTAL
562
TOTAL
Unplanned Events < 1 Hour
601
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
390
exceeding 5,000 MCF
Planned Events > 1 hour or
562
exceeding 5,000 MCF
Pilot Purge
33,999
Assist
0
TOTAL FLARED VOLUME
35,552
Page 7
10/12/2017
2:33 PM
Flare Start Date 09/01/2017
Flare End Date 09/30/2017
GC2 Flare Report Total Volume (MSCF) 1553
Report
Numbs System
Date StartTime Stop Time
Duration Intermittent Black Smoke Planned Reported By
Volume
17-358 Other
09/09/2017 3:42:00 pm 4:34:00 pm
52 min No No Yes BP1\STYVJW
390
Determination Cause
LPS Compressor K-7001 fall WATER WASH.
Action Taken
WATER WASH was completed.
Daily Volume (MSCF)
390
17-364 Other
09/13/2017 4:54:00 pm 6:09:00 pm
75 min No No Yes BP1wSTYVJW
562
Determination Cause
LPS compressor K-7000 Fall WATER WASH.
Action Taken
LPS compressor K-7000 water wash complete.
Daily Volume (MSCF)
562
Total Volume (MSCF) 1553
Generated 10/02/2017 2:13:02PM Page 7 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000032
Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. Monm/year of Disposition
I October -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
0
PRUDHOE 640150 95.66%
AURORA 640120 0.91%
8. Flared or vented 1 hour or less
0
BOREALIS 640130 2.46%
ORION 640135 0.50%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.47%
10. Pilot and Purge
34,088
11. Assist Gas
0
12. Fuel gas used in lease operations.
656,011
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
690,099
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-20,967,555
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
6 Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT Page 8
October 2017
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events ereater than 1 hour
See Attachments
See Attachments
TOTAL
0
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
34,088
Assist
0
TOTAL FLARED VOLUME
34,088
11/13/2017
9:27 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
I BP
5. MonthNear of Disposition
November -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Q
Pool Name Pool Code Percent
7. Reinjected
Q
PRUDHOE 640150 94.597/.
AURORA 640120 1.03%
8. Flared or vented l hour or less
1,736
BOREALIS 640130 3.23%
ORION 640135 0.76%
9. Flared or vented more than 1 hour (see instr.)
Q
POLARIS 640160 0.39%
10. Pilot and Purge
29,074
11. Assist Gas
Q
12. Fuel gas used in lease operations.
693,578
13. Other (see instructions)
Q
Official Use Only
Authorization >1 he
Safely
MCF
14. TOTAL VOLUME (ITEMS 6-12)
724,388
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-20,352,575
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/�//����/��1nn///A/�'"/) Note: All volumes must be corrected
Signature `-�"r `� ti Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
J ) - temperature of 60o F. Authority 20
Printed Name Diane Colley7 Phone (907) 564-5775 Date I / /
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
11/9/2017
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
November 2017
I IML VOLUME DESCRIPTION OF INCIDENT & CAUSE
1820-1845 1,736 Not required for unplanned events <= 1 hr
TOTAL 1,736
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
UMI It IIML VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See Attachments
TOTAL 0
TOTAL 0
TOTAL
1,736
0
0
0
29,074
0
30,810
See Attachments
See Attachments
See Attachments
Page 7
12/13/2017
9:07 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DiSPORITiON
1. Facility Number 2. Facility Name
0290000032 PBU GC 2
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator • 5. MonthNear of Disposition
BP December -2017
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 95.79%
AURORA 640120 0.85%
S. Flared or vented 1 hour or less
U
BOREALIS 640130 2.61%
ORION 640135 0.38%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.37%
10. Pilot and Purge
33,703
l
11. Assist Gas
0
L
12. Fuel gas used in lease operations.
679,907
13. Other (see instructions)
0
Official Use Only
Authorization hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
713,610
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-20,769,242
19. Remarks:
I hereby certify that t foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature_ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
Ll 114
r temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date 1
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
events less than or
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING AND VENTING INCIDENT REPORT
December 2017
DESCRIPTION OF INCIDENT & CAUSE
Not required for events <= 1 hr
ACTION TAKEN TO ELIMINATE CAUSI
Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
^= i irv¢ VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
I ime VOLUME DESCRIPTION OF INI
See Attachments
TOTAL 0
TOTAL
0
0
0
0
33,703
0
33,703
See Attachments
Page 8
1/12/2018