STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I January -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
109,530
Pool Name Pool Code Percent
7. Reinjected
8,872,565
Sadlerochit 640150 0.9%
North Prudhoe Bay State 640152 0.0%
8. Flared or vented 1 hour or less
284
Point McIntyre 640180 22.7%
Lisbume 640144 72.8%
9. Flared or vented more than 1 hour (see instr.)
0
IVlshak-SaoRiver test in 640147 0.9%
Niakuk 640148 2.7%
10. PilotandPurge
11,514
West Beach 640186 0.0%
11. Assist Gas
126,349
12. Fuel gas used in lease operations.
794,029
13. Other (see instructions)
1,330,677
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,244,94$
Lease Use
MCF
15. NGL Gas Equivalent
109,530
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,218,979
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 1,217,502 and Fuel Gas from Prudhoe = 1,477
Pt McIntyre NGLs at CGF (gas equivalent) = 11,372 mcf
I hereby certify that a foregoing ijktrue and correct to the best of my knowledge.
OJ0I �C ,���//,(// Note: All volumes must be corrected
Signature "'" Y Title Manager Production Taxes and Royalties Alaska to pressure Of 14.65 psis and to a
L 1 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone 1907 /
) 564-5775 Date J L' AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -17
VOLUME
PLANNED
DATE TIME (MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1808 reinjection compressor shutdown because leak on
1/21/2017 20:07 - 20:11 165
hydraulic system worsened
U Field production cut to lower gas production.
1808 reinjection compressor shutdown because of
control/instrumentation failure associated with low stage
1/28/2017 19:47 - 19:48 46
pressure switch
U 1808 depressurization complete.
Total Flare <=1 Hour 211
Total Flare> 1 Hour 0
Volume Flared 211
Measured Safety Pilot 8,439
Continuous Assist 92,738
TOTALFLARED 101,388
DATE
TIME
Volume Flared
59
1/21/2017
20:07 - 20:11
1/28/2017
19:47 - 19:48
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -17
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1808 reinjection compressor shutdown because leak on
49 hydraulic system worsened
1808 reinjection compressor shutdown because of
control/instrumentation failure associated with low stage
10 pressure switch
Total Flare <=1 Hour 59
Total Flare > 1 Hour
0
Volume Flared
59
Measured Safety Pilot
2,527
Continuous Assist
27,440
TOTAL FLARED
30,026
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U Field production cut to lower gas production.
U 1808 depressurization complete.
DATE TIME
1/21/2017 20:07 - 20:11
1/28/2017 19:47 - 19:48
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -17
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1808 reinjection compressor shutdown because leak on
5 hydraulic system worsened
1808 reinjection compressor shutdown because of
control/instrumentation failure associated with low stage
3 pressure switch
Total Flare <= 1 Hour 8
Total Flare> 1 Hour
0
Volume Flared
8
Measured Safety Pilot
326
Continuous Assist
3,671
TOTALFLARED
4,005
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE
U Field production cut to lower gas production.
U 1808 depressurization complete.
DATE TIME
1/21/2017 20:07 - 20:11
1/28/2017 19:47 - 19:48
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -17
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1808 reinjection compressor shutdown because leak on
2 hydraulic system worsened
1808 reinjection compressor shutdown because of
control/instrumentation failure associated with low stage
1 pressure switch
Total Flare <=1 Hour 3
Total Flare> 1 Hour
0
Volume Flared
3
Measured Safety Pilot
106
Continuous Assist
1,199
TOTALFLARED
1,308
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U Field production cut to lower gas production.
U 1808 depressurization complete.
DATE TIME
1/21/2017 20:07 - 20:11
1/28/2017 19:47 -19:48
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -17
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1808 reinjection compressor shutdown because leak on
2 hydraulic system worsened
1808 reinjection compressor shutdown because of
control/instrumentation failure associated with low stage
1 pressure switch
Total Flare <=1 Hour 3
Total Flare> 1 Hour
0
Volume Flared
3
Measured Safety Pilot
116
Continuous Assist
1,301
TOTAL FLARED
1,420
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U Field production cut to lower gas production.
U 1808 depressurization complete.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -17
VOLUME PLANNED
DATE TIME IMSCFI DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED C.AS nispnniTinni
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD (GP A)
3. Field
PBU - GPMA
4. Operator •
BP
5. MonthNear of Disposition
I February -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
-
6. Sold
105,586
Pool Name PoolCode Percent
7. Reinjected
9 159 579
Sadlerochit 640150 0.3%
North Prudhoe Bay State 640152 0.0%
8. Flared or vented 1 hour or less
5,188
Point McIntyre 640180 23.6%
Lisburne 640144 73.6%
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in 640147 0.7%
Niakuk 640148 1.8%
10. Pilot and Purge
10,305
West Beach 640186 0.0%
11. Assist Gas
112,537
12. Fuel gas used in lease operations.
765,618
13. Other (see instructions)
1,211,792
Official Use Orly
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,370,605
Lease Use
MCF
15. NGL Gas Equivalent
105,586
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
IT Transferred from
1,290,505
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,290,505 and Fuel Gas from Prudhoe = 0
Pt Mclntrye NGLs at CGF (gas equivalent) = 8974 mcf.
I hereby certify that t e foregoing is true and correct to the best of my knowledge.
Signature Vim �Z& Note: All volumes must be corrected
Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
3 /� temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1807 Reinjection compressor shutdown because of control/Instrumentation failure
2/17-18/2017 23:58-00:58 4,336 associated with #3 turbine bearing vibration.
1807 Reinjection compressor shutdown because of control/Instrumentation failure
associated with low select switch for low stage overhead seal oil tank. Switch replaced
2/18/2017 15:40-15:44 199 and calibarated. #3 bearing vibration probes also replaced and calibrated.
2/19/2017 10:20-10:23 85 1808 maintenance activity to replace P024VIC. 4 minutes assist gas, 2 minutes black smoke.
2/19/2017 10:30-10:32 36 1808 maintenance activity to replace P024VIC. 2 minutes assist gas, i minute black smoke.
Total Flare «1 Hour 4,656
Total Flare> 1 Hour 0
Volume Flared 4,656
Measured Safety Pilot 7,604
Continuous Assist 83,121
TOTALFLARED 95,381
U 1807 T/C depressurized and shut down.
U 1807 T/C depressurized and shut down.
U 1808 T/C depressurized and shut down.
U 1808 T/C depressurized and shut down.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO, 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -17
VOLUME
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/17-18/2017 23:58-00:58 254
2/18/2017 15:40-15:44 11
2/19/2017 10:20-10:23 12
2/19/2017 10:30-10:32 5
Total Flare c=1 Hour 282
TWO Flare > 1 Hour
0
Volume Flared
282
Measured Safety Pilot
2,409
Continuous Assist
26,208
TOTAL FLARED
28,899
1807 Reinjection compressor shutdown because of control/instrumentation failure
associated with #3 turbine bearing vibration.
1807 Reinjection compressor shutdown because of control/instrumentation failure
associated with low select switch for low stage overhead seal oil tank. Switch replaced
and calibarated. p3 bearing vibration probes also replaced and calibrated.
1808 maintenance activity to replace P024VIC. 4 minutes assist gas, 2 minutes black
smoke.
1808 maintenance activity to replace P024VIC. 2 minutes assist gas,1 minute black smoke.
U 1807 T/C depressurized and shut down.
U 1807 T/C depressurized and shut down.
U 1808 T/C depressurized and shut down.
U 1808 T/C depressurized and shut down.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1807 Reinjection compressor shutdown because of control/Instrumentation failure
2/17-18/2017 23:58-00:58 159 associated with p3 turbine bearing vibration,
1807 Reinjection compressor shutdown because of control/instrumentation failure
associated with low select switch for low stage overhead seal oil tank. Switch replaced
2/18/2017 15:40-15:44 7 and calibarated. p3 bearing vibration probes also replaced andcalibrated.
1808 maintenance activity to replace P024VIC. 4 minutes assist gas, 2 minutes black
2/19/2017 10:20-10:23 3 smoke.
2/19/2017 10:30-10:32 1 1808 maintenance activity to replace P024VIC. 2 minutes assist gas,1 minute black smoke.
Total Flare <=1 Hour 170
Total Fiore >1 Hour 0
Volume Flared 170
Measured Safety Pilot
189
Continuous Assist
2,076
TOTALFLARED
2,435
U 1807 T/C depressurized and shut down.
U 1807 T/C depressurized and shut down.
U 1808 T/C depressurized and shut down.
U 1808 T/C depressurized and shut down.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1807 Reinjection compressor shutdown because of control/instrumentation failure
2/17-18/2017 23:58-00:58 57 associated with #3 turbine bearing vibration.
1807 Reinjection compressor shutdown because of control/instrumentation failure
associated with low select switch for low stage overhead seal oil tank. Switch replaced
2/18/2017 15:40-15:44 3 and calibarated. g3 bearing vibration probes also replaced and calibrated.
1808 maintenance activity to replace P024VIC. 4 minutes assist gas, 2 minutes black
2/19/2017 10:20-10:23 2 smoke.
2/19/2017 10:30-10:32 0 1808 maintenance activity to replace P024VIC. 2 minutes assist gas,1 minute black smoke.
Total Flare <=1 Hour 62
Total Flare> 1 Hour
0
Volume Flared
62
Measured Safety Pilot
70
Continuous Assist
773
TOTAL FLARED
905
U 1807 T/C depressurized and shut down.
U 1807 T/C depressurized and shut down.
U 1808 T/C depressurized and shut down.
U 1808 T/C depressurized and shut down.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1807 Reinjection compressor shutdown because of control/instrumentation failure
2/17-18/2017 23:58-00:58 17 associated with#3 turbine bearing vibration. U 1807 T/C depressurized and shut down.
1807 Reinjection compressor shutdown because of control/instrumentation failure
33
associated with low select switch for low stage overhead seal oil tank. Switch replaced
359
2/18/2017 15:40-15:44 1 and calibarated. M3 bearing vibration probes also replaced and calibrated.
U 1807 T/C depressurized and shut down.
1808 maintenance activity to replace P024VIC.4 minutes assist gas, 2 minutes black
2/19/2017 10:20-10:23 0 smoke.
U 1808 T/C depressurized and shut down.
2/19/2017 10:30-10:32 0 1808 maintenance activity to replace P024VIC. 2 minutes assist gas,1 minute black smoke.
U 1808 T/C depressurized and shut down.
Total Flare <=1 Hour 18
Total Flore> I Hour 0
Volume Flared 18
Measured Safety Pilot
33
Continuous Assist
359
TOTALFLARED
410
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
March -2017
Disposition
Volume MCF
20. Forproduction from multiple
pools, list contribution of each pool as a percent of
Total Volume.
6.
Sold
127,649
Pool Name
Paol Code Percent
7.
Reinjected
10,858,275
Sadlerochit
640150 0.5%
North Prudhoe Bay State
640152 0.0%
8.
Flared or vented 1 hour or less
288
Point McIntyre
640180 25.0%
Lisburne
640144 72.6%
9.
Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in
640147 1.4%
Nlakuk
640148 0.5%
10.
Pilot and Purge
11,534
West Beach
640186 0.0%
11.
Assist Gas
139,504
12. Fuel gas used in lease operations.
905,966
13.
Other (see instructions)
1,411,639
OlBclel Use Only
Authorization hr:
SafetyMCF
14. TOTAL VOLUME (ITEMS 6.12)
13,454,855
Leese Use
MCF
15. NGL Gas Equivalent
127,649
Conservation
MCF
16.
Purchased gas
0
Waste:
MCF
17.
Transferred from:
1,809,477
Commissioner
Date
18.
Transferred to: (Express as a negative #)
0
19.
Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,809,477
Pt McIntyre NGLs at CGF (gas equivalent)
and Fuel Gas from Prudhoe = 0
= 10,123 mc£
I hereby certify that the foregoing is true and correct to the best of my knowledge.
U�( dC / %�& Aj
Signature 1.t-L/I
Ar
Printed Name Diane Colle
Note: All volumes must be corrected
Title Manager Production Taxes and Rovalties Alaska t0 pressure Of 14.65 psis and to a
`I 1� temperature of 60o F. Authority 20
Phone (907) 564-5775 Date `F / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Marl?
VOLUME PLANNED
DATE TIME (Ill DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/3/2017 14:32-15:18 195
3/9/2017 14:47-14:48 3
Total Flare <+1 Hour 198
Total Flore> 1 How
0
Volume Flared
198
Measured $a" Pilot
8,374
Continuous Assist
101,412
TOTAL FLARED
109,984
E02024-SEV valve leaked by
Start of STV/IP 1801 Turbine/Compressor
Closed manual block valve
Cease start attempt
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/3/2017 14:32-15:18 83
3/9/2017 14:47 -14:48 1
Total Flare r_ 1 Hour 84
Total Flare > 1 Hour
0
Volume Flared
84
Measured Safety Pilot
2,887
Continuous Assist
34,763
TOTAL FLARED
37,734
E02024-SEV valve leaked by
Start of STV/IP 1801 Turbine/Compressor
Closed manual block valve
Cease start attempt
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0, 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -17
VOLUME
PLANNED
DATE TIME (Msd) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/3/2017 14:32 - 15:1F 1 E02024-SEV valve leaked by U Closed manual block valve
Total Flare <a1 Hour 1
Total FIl1 Hour
Volume Flared
Measured Safety Pilot 61
Continuous Assist 735
TOTALFLARED 797
VOLUME
3/3/2017 14:32 - 15:18
Total Flare <=1 Hour 4
Total Flare > 1 Hour
0
Volume Flared
4
Measured Safety Pilot
160
Continuous Assist
1,934
TOTAL FLARED
2,098
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -17
DESCRIPTION OF INCIDENTS
E02024-SEV valve leaked by
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Closed manual black valve
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -17
VOLUME PLANNED
DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/3/2017 14:32 - 15:18
Total Flare �- 1 Hour 1
Total Flare> 1 Hour
0
Volume Flared
i
Measured Safety Pilot
52
Continuous Assist
660
TOTALFLARED
713
E02024-SEV valve leaked by
Closed manual black valve
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= i Hour
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare.I Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
12. Facility Name
IPBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I Aril -2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
e. Sold
126,782
Pool Name Pool Code Percent
7. Reinjected
10,188,156
Sadlerochit 640150 0.9°h
North Prudhoe Bay State 640152 0.0%
8. Flared or vented 1 hour or less
1
Point McIntyre 640180 25.1%
Lisburne 640144 71.9%
9. Flared or vented more than 1 hour (see instr.)
0
IVlshak-SagRiver test in 640147 1.6%
Niakuk 640148 0.5%
10. Pilot and Purge
11,088
West Beach 640186 0.0%
11. Assist Gas
118,338
12. Fuel gas used in lease operations.
864,123
13. Other (see instructions)
1,839,104
Official -U"Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 8-12)
13,147,592
Lease Use
MCF
15. NGL Gas Equivalent
126,782
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,809,484
1
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,809,110 and Fuel Gas from Prudhoe = 374
Pt McIntyre NGLS ay CGF (gas equivalnt) = 10,725 mcC
I hereby certify that %a foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psie and to 8
7 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Dates / 1 AAC25.235.
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
GAS FLARING INCIDENTS
Apr -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1800 STV -IP compressor shutdown because of
4/18/2017 17:50-17:51 1 control/instrumentation failure associated with CASTS testing U Flare valve closed
Total Flare c=1 Hour 1
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 7,986
Continuous Assist 85,296
TOTAL FLARED 93,283
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE RAV, POINT MCINTVRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 2,770
Continuous Assist 29,493
TOTAL FLARED 32,263
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flom > 1 Hour
Volume Flared 0
Measured Safety Pilot 58
Continuous Assist 623
TOTALFLARED 681
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -17
VOLUME PLANNED
DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flom <=1 Hour
Total Flare> I Hour
Volume Flared 0
Measured Safety Pilot 179
Continuous Assist 1,911
TOTALFLARED 2,090
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 95
Continuous Assist 1,015
TOTAL FLARED 1,110
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -17
VOLUME PLANNED
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -17
VOLUME PLANNED
DATE TIME IMSCFI DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
P13 LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Monthfyear of Disposition
1 Ma -2017
Disposition
Volume MCF
20. For production from multiple pools,
list contribution of each pool as a percent of
Total Volume.
6.
sold
128,386
Pool Name
Pool Code Percent
7.
Reinjected
9,554,193
Sadlerochit
640150 0.8%
North Prudhoe Bay State
640152 0.0%
8.
Flared or vented 1 hour or less
0
Point McIntyre
640180 23.7%
Lisburne
640144 73.2%
9.
Flared or vented more than 1 hour (see instr.)
0
Ivishak-SaoRiver test in
640147 1.8%
Niakuk
640148 0.5%
10.
Pilot and Purge
11,461
West Beach
640186 0.0%
11.
Assist Gas
136,710
12. Fuel gas used in lease operations.
869,905
13.
Other (see instructions)
1,833,503
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,534,158
Lease Use
MCF
15. NGL Gas Equivalent
128,386
Conservation
MCF
16.
Purchased gas
0
Wasi
MCF
17.
Transferred from:
1,678,062
Commissioner
Date
18.
Transferred to: (Express as a negative #)
0
19.
Remarks: Block 13: Lift Gas Off Field; Block 17: Mt from Prudhoe = 1,678,062 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas equivalent) = 12,005 mcf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
jp
Signature
Printed Name Diane Colley
Title Manager Production Taxes and Royalties Alaska
Phone (907) 564-5775 Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flom> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 8,393
Continuous Assist 100,027
TOTAL FLARED 108,420
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -17
VOLUME PLANNED
DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare v l Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 2,708
Continuous Assist 32,385
TOTAL FLARED 35,093
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 62
Continuous Assist 747
TOTAL FLARED 809
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -17
VOLUME PLANNED
DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 204
Continuous Assist 2,426
TOTAL FLARED 2,630
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -17
VOLUME PLANNED
DATE TIME )Mxf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 94
Continuous Assist 1,125
TOTALFLARED 1,219
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flom <= 2 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -1T
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= I Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Monthfyear of Disposition
I June -2017
Disposition
Volume MCF
20. For production from multiple
pools, list contribution of each pool as a percent of
Total Volume.
6.
Sold
71,328
Pool Name
Pool Code Percent
7.
Reinjected
8,613,956
Sadlerochit
640150 0.9%
North Prudhoe Bay State
640152 0.0%
8.
Flared or vented 1 hour or less
0
Point McIntyre
640180 28.8%
Lisburne
640144 67.7%
9.
Flared or vented more than 1 hour (see instr.)598
Ivishak-SagRiver test In
640147 2.1%
Niakuk
640148 0.6%
10.
Pilot and Purge
11,053
West Beach
640186 0.0%
11.
Assist Gas
142,404
12. Fuel gas used in lease operations.
850,427
13.
Other (see instructions)
1,524,013
Official Use Only
Authorization >t hr:
Safety
59�
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,213,779
Lease Use
MCF
15. NGL Gas Equivalent
71,328
Conservation
MCF
16.
Purchased gas
p
Waste:
MCF
17.
Transferred from:
1,250,141
18.
Transferred to: (Express as a negative #)
0
Commissioner
Da
19.
Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,250,141 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas euqivalent) = 9846 met'
I hereby certify that the regoing is true and correct to the best of my knowledge.
Signature L)ONNote:
Printed Name Diane Colley
All volumes must be corrected
Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Phone (907) 564-5775 Date AAC25.235.
1/-7
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS &CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c.1 Hour 0
6/5/2017 11:48 - 17:04
6/20/2017 18:52-22:15 395
Total Flom >I Hour
396
Volume Flared
396
Measured Safety Pilot
7,484
Continuous Assist
96,370
TOTAL FLARED
104,250
1801 shutdown for maintenance
1800 STVAP compressor shutdown because of
control/instrumentation associated with low IP suction
pressure shutdown.
1801 T/C depressurization completed
Completed troubleshooting, reloaded 1800
T/C, and stabilized facility process and
operation. Flare assist gas mitigated black
smoke (first 10 minutes(.
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r-1 Hour 0
06/05/17 11:48 - 17:04 1
06/20/17 18:52-22:15 177
Total Flare > 1 Hour
178
Volume Flared
178
Measured Safety Pilot
3,165
Continuous Assist
40,852
TOTAL FLARED
44,195
1801 shutdown for maintenance
1800 STVAP compressor shutdown because of
control/instrumentation associated with low IP suction
pressure shutdown.
U 1801 T/C depressurization completed
Completed troubleshooting, reloaded 1800
T/C, and stabilized facility process and
operation. Flare assist gas mitigated black
U smoke (first 10 minutes(.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -17
VOLUME PLANNED
DATE TIME (Meet) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour 0
06/05/17 11:48 - 17:04 0 1801 shutdown for maintenance
1800 STV -IP compressor shutdown because of
control/instrumentation associated with low IP suction
06/20/17 18:52-22:15 4 pressure shutdown.
Total Flom n 1 Hour
4
Volume Flared
4
Measured Safety Pilot
67
Continuous Assist
860
TOTAL FLARED
932
U 1801 T/C depressurization completed
Completed troubleshooting, reloaded 1800
T/C, and stabilized facility process and
operation. Flare assist gas mitigated black
U smoke )first 30 minutes).
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -17
VOLUME PLANNED
DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare .1 Hour 0
O6/05/17 11:48- 17:04 0 1801 shutdown for maintenance
18005TVAP compressor shutdown because of
control/instrumentation associated with low IP suction
06/20/17 18:52-22:15 13 pressure shutdown.
Total Flare > 1 Hour
13
Volume Flared
13
Measured Safety Pilot
232
Continuous Assist
2,967
TOTALFLARED
3,212
U 1801 T/C depressurization completed
Completed troubleshooting, reloaded 1800
T/C, and stabilized facility process and
operation. Flare assist gas mitigated black
U smoke (first 10 minutes).
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -17
VOLUME PLANNED
DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
06/05/17 11:48-17:04 0 1801 shutdown for maintenance
1800 STV -IP compressor shutdown because of
control/instrumentation associated with low IF suction
06/20/17 18:52 - 22:15 7 pressure shutdown.
Total Flare > 1 Hour 7
Volume Flared 7
Measured Safety Pilot 105
Continuous Assist 1,355
TOTAL FLARED 1,467
U 1801 T/C depressurization completed
Completed troubleshooting, reloaded 1800
T/C, and stabilized facility process and
operation. Flare assist gas mitigated black
U smoke )first 30 minutes).
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -17
VOLUME PLANNED
DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare. 3 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured SatetV Pilot
Continuous Assist
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED
Link, Liz M (DOA)
From: Blake, Jennifer J <Jennifer.Blake@bp.com>
Sent: Tuesday, June 13, 2017 2:28 PM
To: 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin;
Buckbee, Rachel A; AK, OPS GPMA OSM; Bessler, Mark
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc reporting(cbalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 06/05/2017 11:48 and stopping at 06/05/2017 17:04 with a volume of 2
(MSCF). The event lasted for 316 minutes and was due to shutting down T/Compressor 1801 for maintenance. The event
stopped when depressurization was completed. The flaring event was intermittent.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, July 3, 2017 9:22 AM
To: 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A, Arthur, Gregory; Starck, Jennifer L; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin;
Buckbee, Rachel A; AK, OPS GPMA OSM; Bessler, Mark
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc reportingCcDalaska gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 06/20/2017 20:33 and stopping at 06/20/2017 21:39 with a volume of 201
(MSCF). The intermittent event lasted for 66 minutes and was due to a STV/IP compressor (1800) shutdown because of a
control/instrumentation failure associated with the low IP suction pressure shutdown. The event stopped when
troubleshooting was completed and the STV/IP was reloaded..
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
0f►11 ITV M1 m �� w. -_—
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
/7�
Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare 4=1 Hour
6,483
Volume Flared
Commissioning of new 1807/08 P0241C remote controls. Assist gas
7/21/2017
14:35 -15:30
168
unavailable due to LPC Plant shudown for maintenance.
shutdown maintenance activities.
7/23/2017 13:32 - 16:13
6
1807 compressor shutdown trip initiated and vented to flare due to
1800 STV/IP shutdown on High High Level SNIP Suction Scrubber.
High Stage Overhead Seal Oil Tank High High level. Assist gas
7/21/2017
19:10-19:12
21
unavailable.
Start 1807 after shutdown maintenance was completed.
7/23/2017
07:27-07:30
52
Assist gas
was unavailable
1808 Reinjection Gas Turbine Compressor shutdown on High
Discharge Temp High Stage Compressor and lube oil leak. 1807
7/24/2017
18:57 - 20:12
3,932
shutdown on low fuel gas pressure. (2 events)
7/25/2017
07:13 - 11:30
157
1808 shutdown due to high discharge temp (3 short events)
7/28/2017
18:16-18:50
2,153
1808 low stage overhead seal oil tank low level shutdown
Total Flare 4=1 Hour
6,483
Volume Flared
15,972
Measured Safety Pilot
Depressuring LPC plant, eastside 24" common line, and LGI line for
7/13-15/2017 07:53-14:30
8,337
shutdown maintenance activities.
7/23/2017 13:32 - 16:13
6
Attempted startup of 1800 STV/IP during LPC startup.
1800 STV/IP shutdown on High High Level SNIP Suction Scrubber.
7/28-29/2017 22:25 - 05:20
1,146
Black smoke occurred from 22:25 to 22:45
Total Flare> 1 Hour
9,489
Volume Flared
15,972
Measured Safety Pilot
7,631
Continuous Assist
63,375
TOTALFLARED
86,978
P Completed commissioning
Manually drained the level from the Overhead Seal Tank clearing
U shutdown, resetting, and closing vent valves to flare.
P 1807 started after quick vent cycle.
Restart 1807 turbine compressor. Blow down 1808 - no restart
U until repair work complete.
U 1808 depressured.
U Cut production at drillsites
Depressuring continued until zero pressures for maintenance
P activities.
U Started on 3rd attempt.
Repair attempts to 1800 were not successful. After doing a repair
U on 1801 as well, restarted 1801 and flare stopped.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -17
VOLUME
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 823
Depressuring LPC plant, eastside 24" common line, and LGI line for
7/13-15/2017 07:53 - 14:30 5,369 shutdown maintenance activities.
7/23/2017 13:32 - 16:13 0 Attempted startup of 1800 STV/IP during LPC startup.
1800 STVAP shutdown on High High Level SNIP Suction Scrubber.
7/28-29/2017 22:25 - 05:20 455 Black smoke occurred from 22:25 to 22:45
Total Flare> I Hour 5,824
Volume Flared 6,647
Measured Safety Pilot 2,998
Continuous Assist 24,222
TOTAL FLARED 33,867
P Completed commissioning
Manually drained the level from the Overhead Seal Tank clearing
U shutdown, resetting, and closing vent valves to flare.
P 1807 started after quick vent cycle.
Restart 1807 turbine compressor. Blow down 1808- no restart
U until repair work complete.
U 1808 depressured.
U Cut production at drillsites
Depressuring continued until zero pressures for maintenance
P activities.
U Started on 3rd attempt.
Repair attempts to 1800 were not successful. After doing a repair
U on 1801 as well, restarted 1801 and flare stopped.
Commissioning of new 1807/08 P0241C remote controls. Assist gas
7/21/2017
14:35 - 15:30
84
unavailable due to LPC Plant shudown for maintenance.
1807 compressor shutdown trip initiated and vented to flare due to
High Stage Overhead Seal Oil Tank High High level. Assist gas
7/21/2017
19:10-19:12
11
unavailable.
Start 1807 after shutdown maintenance was completed. Assist gas
7/23/2017
07:27-07:30
2
was unavailable
1808 Reinjection Gas Turbine Compressor shutdown on High
Discharge Temp High Stage Compressor and lube oil leak. 1807
7/24/2017
18:57 - 20:12
45
shutdown on low fuel gas pressure. (2 events)
7/25/2017
07:13 - 11:30
7
1808 shutdown due to high discharge temp (3 short events)
7/28/2017
18:16-18:50
674
1808 low stage overhead seal oil tank low level shutdown
Total Flare <=1 Hour 823
Depressuring LPC plant, eastside 24" common line, and LGI line for
7/13-15/2017 07:53 - 14:30 5,369 shutdown maintenance activities.
7/23/2017 13:32 - 16:13 0 Attempted startup of 1800 STV/IP during LPC startup.
1800 STVAP shutdown on High High Level SNIP Suction Scrubber.
7/28-29/2017 22:25 - 05:20 455 Black smoke occurred from 22:25 to 22:45
Total Flare> I Hour 5,824
Volume Flared 6,647
Measured Safety Pilot 2,998
Continuous Assist 24,222
TOTAL FLARED 33,867
P Completed commissioning
Manually drained the level from the Overhead Seal Tank clearing
U shutdown, resetting, and closing vent valves to flare.
P 1807 started after quick vent cycle.
Restart 1807 turbine compressor. Blow down 1808- no restart
U until repair work complete.
U 1808 depressured.
U Cut production at drillsites
Depressuring continued until zero pressures for maintenance
P activities.
U Started on 3rd attempt.
Repair attempts to 1800 were not successful. After doing a repair
U on 1801 as well, restarted 1801 and flare stopped.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUX
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 64
Depressuring LPC plant, eastside 24" common line, and LGI line for
7/13-15/2017 07:53-14:30 29 shutdown maintenance activities.
7/23/2017 13:32 - 16:13 0 Attempted startup of 1800 STV/IP during LPC startup.
1800 STOP shutdown on High High Level STVIP Suction Scrubber.
7/28-29/2017 22:25 - 05:20 15 Black smoke occurred from 22:25 to 22:45
Total Flom> 1 Hour
44
Volume Flared
Commissioning of new 1807/08 P0241C remote controls. Assist gas
7/21/2017
14:35 - 15:30
1
unavailable due to LPC Plant shudown for maintenance.
TOTAL FLARED
708
1807 compressor shutdown trip initiated and vented to flare due to
High Stage Overhead Seal Oil Tank High High level. Assist gas
7/21/2017
19:10-19:12
0
unavailable.
Start 1807 after shutdown maintenance was completed. Assist gas
7/23/2017
07:27-07:30
0
was unavailable
1808 Reinjection Gas Turbine Compressor shutdown on High
Discharge Temp High Stage Compressor and lube oil leak. 1807
7/24/2017
18:57 - 20:12
38
shutdown on low fuel gas pressure. (2 events)
7/25/2017
07:13 - 11:30
1
1808 shutdown due to high discharge temp (3 short events)
7/28/2017
18:16-18:50
24
1808 low stage overhead seal oil tank low level shutdown
Total Flare <=1 Hour 64
Depressuring LPC plant, eastside 24" common line, and LGI line for
7/13-15/2017 07:53-14:30 29 shutdown maintenance activities.
7/23/2017 13:32 - 16:13 0 Attempted startup of 1800 STV/IP during LPC startup.
1800 STOP shutdown on High High Level STVIP Suction Scrubber.
7/28-29/2017 22:25 - 05:20 15 Black smoke occurred from 22:25 to 22:45
Total Flom> 1 Hour
44
Volume Flared
108
Measured Safety Pilot
58
Continuous Assist
542
TOTAL FLARED
708
P Completed commissioning
Manually drained the level from the Overhead Seal Tank clearing
U shutdown, resetting, and closing vent valves to flare.
P 1807 started after quick vent cycle.
Restart 1807 turbine compressor. Blow down 1808 - no restart
U until repair work complete.
U 1808 depressured.
U Cut production at drillsites
Depressuring continued until zero pressures for maintenance
P activities.
U Started on 3rd attempt.
Repair attempts to 1800 were not successful. After doing a repair
U on 1801 as well, restarted 1801 and flare stopped.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Commissioning of new 1807/08 P0241C remote controls. Assist gas
7/21/2017
14:35- 15:30
5
unavailable due to LPC Plant shudown for maintenance.
Measured Safety Pilot
Depressuring LPC plant, eastside 24" common line, and LGI line for
7/13-15/2017 07:53 - 14:30
1807 compressor shutdown trip initiated and vented to flare due to
shutdown maintenance activities.
7/23/2017 13:32 - 16:13
0
High Stage Overhead Seal Oil Tank High High level. Assist gas
7/21/2017
19:10-19:12
1
unavailable.
43
Black smoke occurred from 22:25 to 22:45
Start 1807 after shutdown maintenance was completed. Assist gas
7/23/2017
07:27-07:30
4
was unavailable
1808 Reinjection Gas Turbine Compressor shutdown on High
Discharge Temp High Stage Compressor and lube oil leak. 1807
7/24/2017
18:57 - 20:12
243
shutdown on low fuel gas pressure. (2 events)
7/25/2017
07:13 - 11:30
8
1808 shutdown due to high discharge temp (3 short events)
7/28/2017
18:16-18:50
68
1908 low stage overhead seal oil tank low level shutdown
Total Flare <=1 Hour
329
Volume Flared
562
Measured Safety Pilot
Depressuring LPC plant, eastside 24" common line, and LGI line for
7/13-15/2017 07:53 - 14:30
190
shutdown maintenance activities.
7/23/2017 13:32 - 16:13
0
Attempted startup of 1800 STV/IP during LPC startup.
1800 STV/IP shutdown on High High Level STVIP Suction Scrubber.
7/28-29/2017 22:25 - 05:20
43
Black smoke occurred from 22:25 to 22:45
Total Flow .1 Hour
233
Volume Flared
562
Measured Safety Pilot
353
Continuous Assist
3,065
TOTALFLARED
3,980
P Completed commissioning
Manually drained the level from the Overhead Seal Tank clearing
U shutdown, resetting, and closing vent valves to flare.
P 1807 started after quick vent cycle.
Restart 1807 turbine compressor. Blow down 1808- no restart
U until repair work complete.
U 1808 depressured.
U Cut production at drillsites
Depressuring continued until zero pressures for maintenance
P activities.
U Started on 3rd attempt.
Repair attempts to 1800 were not successful. After doing a repair
U on 1801 as well, restarted 1801 and flare stopped.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -17
VOLUME PLANNED
DATE TIME (M"f) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Commissioning of new 1807/08 P0241C remote controls. Assist gas
7/21/2017
14:35-15:30
3
unavailable due to LPC Plant shudown for maintenance.
Measured Safety Pilot
356
Continuous Assist
1807 compressor shutdown trip initiated and vented to Flare due to
TOTALFLARED
5,066
High Stage Overhead Seal Oil Tank High High level. Assist gas
7/21/2017
19:10-19:12
0
unavailable.
Start 1807 after shutdown maintenance was completed. Assist gas
7/23/2017
07:27-07:30
8
was unavailable
1808 Reinjection Gas Turbine Compressor shutdown on High
Discharge Temp High Stage Compressor and lube oil leak. 1807
7/24/2017
18:57 - 20:12
502
shutdown on low fuel gas pressure. (2 events)
7/25/2017
07:13 - 11:30
15
1808 shutdown due to high discharge temp (3 short events)
7/28/2017
18:16-18:50
158
1808 low stage overhead seal oil tank low level shutdown
Total Fiore <=1 Hour 686
Depressuring LPC plant, eastside 24" common line, and LGI line for
7/13-15/2017 07:53 - 14:30 210 shutdown maintenance activities.
7/23/2017 13:32 -16:13 1 Attempted startup of 1800 STV/IP during LPC startup.
1800 STV/IP shutdown on High High Level SNIP Suction Scrubber.
7/28-29/2017 22:25 - 05:20 93 Black smoke occurred from 22:25 to 22:45
Total Flare> 1 Hour
304
Volume Flared
990
Measured Safety Pilot
356
Continuous Assist
3,720
TOTALFLARED
5,066
P Completed commissioning
Manually drained the level from the Overhead Seal Tank clearing
U shutdown, resetting, and closing vent valves to flare.
P 1807 started after quick vent cycle.
Restart 1807 turbine compressor. Blow down 1808 - no restart
U until repair work complete.
U 1808 depressured.
U Cut production at drillsites
Depressuring Continued until zero pressures for maintenance
P activities.
U Started on 3rd attempt.
Repair attempts to 1800 were not successful. After doing a repair
U on 1801 as well, restarted 1801 and flare stopped.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -17
VOLUME
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flom <=1 Hour 0
Total Flare> 3 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Link, Liz M (DOA)
From: Blake, Jennifer J <Jennifer.Blake@bp.com>
Sent: Wednesday, July 26, 2017 4:55 PM
To: AKOps Prod EOCTL,' 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; AK, HSSEE
Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin; Buckbee, Rachel A; AK, OPS
GPMA OSM; Hanus, John M.
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reporting(5a laska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 07/13/2017 08:26 and stopping at 07/15/2017 14:30. The event was due to the
1808 reinjection compressor train shutdown as well as depressuring the LPC Plant, Eastside 24" common line and LGI
Line for shutdown maintenance activities. The event stopped when depressurization was completed. Daily volumes and
durations are summarized below:
• 07/13/2017: volume of 4505 (MSCF) and duration of 932 minutes.
• 07/14/2017: volume of 9272 (MSCF) and duration of 1440 minutes.
• 07/15/2017: volume of 100 (MSCF) and duration of 870 minutes.
A flaring event occurred at LPC starting at 07/23/2017 13:32 and stopping at 07/23/2017 15:35 with a volume of 1
(MSCF). The event lasted for 123 minutes and was due to an attempted startup of 1800 STV/IP during the LPC startup
however the 1800 STWIP failed to start. The event stopped when vents were closed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, August 25, 2017 3:26 PM
To: Blake, Jennifer J; 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; AK, HSSEE
Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin; Buckbee, Rachel A; AK, OPS
GPMA OSM; Hanus, John M.
Subject: Flaring Event at LPC
Follow Up Flag: Follow up
Flag Status: Flagged
To: AOGCC Reporting CC:
aogcc. reportinq(a7alaska.9oy
Victoria Loepp, AOGCC
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 07/28/2017 22:25 and continuing into the next day with a volume of 408
(MSCF) on 07/28/2017. The event lasted for 94 minutes on 07/28/2017 and was due to STV/IP Compressor 1800
shutdown on high -high level in the Suction Scrubber. The event stopped when continued into 07/29/2017.
A flaring event occurred at LPC continuing from the previous day and stopping at 07/29/2017 05:20 with a volume of 1344
(MSCF) on 07/29/2017. The event lasted for 320 minutes on 07/29/2017 and was due to the STV/IP compressor 1800
shutdown on high -high level in the suction scrubber. The event stopped when STV/IP compressor 1801 was restarted
while repair attempts continued on STV/IP 1800.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
CA f%11 ITV r%P^w� ...� --
Fomt 10422 Rev. 5/2009
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug47
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c.1 Hour 0
Total Flare > I Hour
Volume Flared
Measured Safety Pilot 7,256
Continuous Assist 80,873
TOTALFLARED 88,129
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r_ 1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
2,905
Continuous Assist
32,372
TOTAL FLARED
35,277
RP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug37
VOLUME PLANNED
DATE TIME (MscfI DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 80
Continuous Assist 895
TOTALFLARED 975
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -17
VOLUME PLANNED
DATE TIME (Mstf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare. I Hour
Volume Flared O
Measured Safety Pilot 283
Continuous Assist 3,148
TOTALFLARED 3,431
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -17
VOLUME PLANNED
DATE TIME )Msct) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 932
Continuous Assist 10,383
TOTAL FLARED 11,315
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Nour
Total Flore> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED D
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTIONTAKENTO
Total Flare <= I Hour 0
Total Flare> I Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRnm irFn r,ec n1QDnQ1T1nA1
1.
Facility Number 2. Facility Name
3. Field
--- �iw rev• vvl I�V��
0290000009 PB LISBURNE PROD GPMA
PBU - GPMA
4. Operator 5. MonthNear of Disposition
BP
Disposition
Volume MCF
Se tember-2017
20. For production from multiple pools, list contribution of each pool as a percent of
6.
Sold
109,638
Total Volume.
Pool Name Pool Code Percent
7.
Reinjected
9,621,859
Sadlerochit 640150 2.9%
North Prudhoe Bay State 640152 0.0%
8.
Flared or vented I hour or less
721
Point McIntyre 640180 23.7%
Lisburne 640144 71.3%
9.
Flared or vented more than 1 hour (see insa.)
6,880
Ivishak-SagRiver test in 640147 1.7%
Niakuk 640148 0.5%
10.
Pilot and Purge
11,095
West Beach 640186 0.0%
11,
Assist Gas
125,234
12.
Fuel gas used in lease operations.
794,791
13.
Other (see instructions)
1,509,497
Official Use Only
Authorization >1 hr: MCF
74.
TOTAL VOLUME (ITEMS 6-12)
12,179,715
Safety z �
15.
NGL Gas Equivalent
Lease Use MCF
109,638
/vI
16.
Purchased gas
Conservation MCF
0
Waste: MCF
17.
Transferred from:
1,942,640
P - /
18.
Transferred to: (Express as a negative#)
O
Commissioner Date
19.
Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,942,615 and Fuel Gas from Prudhoe = 25
Pt McIntyre NGLs at CGF (gas equivalent) = 9513
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ��� ���%
Note: Alt volumes must be corrected
Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
Printed
Name Diane Colley
--7 temperature of 60o F. Authority 20
Phone (907) 564-5775
Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/10/2017 01:01-01:05 416 1808 shut down due to high exhaust back pressure U Depressured as normal
9/10/2017 20:50 - 20:54 204 Shut down 1808 as a normal shut down to enter WHRU P 18DB depressured as needed
Total Flare .I Hour 620
09/15/17 12:05 - 01:10 5,072 1807 shut down cause unknown U Restarted 1807
Total Flare > 1 Hour
5,072
Volume Flared
5,692
Measured Safety Pilot
7,948
Continuous Assist
89,737
TOTAL FLARED
103,377
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS IS CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/10/2017 01:01-01:05 38 1808 shut down due to high exhaust back pressure U Depressured as normal
9/10/2017 20:50 - 20:54 18 Shut dawn 1808 as a normal shut down to enter W HRU P 1808 depressured as needed
Total Flare <-1 Hour 56
09/15/17 12:05 - 01:10 1,489 1807 shut down cause unknown U Restarted 1807
Total Flare> 1 Hour
1,489
Volume Flared
1,545
Measured Safety Pilot
2,593
Continuous Assist
29,249
TOTAL FLARED
33,387
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -17
VOLUME PLANNED
DATE TIME (Mstf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/10/2017 01:01 - 01:05 6 1808 shut dawn due to high exhaust back pressure
9/10/2017 20:50 - 20:54 3 Shut down 1808 as a normal shut down to enter WHRU
Total Flare <=1 Hour 9
09/15/17 12:05-01:10 50
Total Flare > 1 Hour
50
Volume Flared
59
Measured Safety Pilot
55
Continuous Assist
623
TOTALFLARED
737
1807 shut down cause unknown
U Depressured as normal
P 1808 depressured as needed
U Restarted 1807
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -17
VOLUME PLANNED
DATE TIME (Msd) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/10/2017 01:01-01:05 24 1808 shut down due to high exhaust back pressure
9/10/2017 20:50- 20:54 12 Shut down 1808 as a normal shut down to enter WHRU
Total Flow <=1 Hour 36
09/15/17 12:05 - 01:10 189
Total Flare> 1 Hour
189
Volume Flared
225
Measured Safety Pilot
199
Continuous Assist
2,252
TOTALFLARED
2,676
1807 shut down cause unknown
U Depressured as normal
P 1808 depressured as needed
U Restarted 1807
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -17
VOLUME PLANNED
DATE TIME ININQ DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/10/2017 01:01- 01:05 0 1808 shut down due to high exhaust back pressure
9/10/2017 20:50 - 20:54 0 Shut down 1808 as a normal shut down to enter WHRU
Total Flare <=1 Hour 0
09/15/17 12:05-01:10 80
Total Fore > 1 Hour
80
Volume Flared
80
Measured Safety Pilot
300
Continuous Assist
3,373
TOTAL FLARED
3,753
1807 shut down cause unknown
U Depressured as normal
P 1808 depressured as needed
U Restarted 1807
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -17
VOLUME PLANNED
DATE TIME IMSCFI DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flom > I Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Wednesday, October 11, 2017 2:30 PM
To: Blake, Jennifer 1; 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; AK, HSSEE
Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin; Buckbee, Rachel A; AK, OPS
GPMA OSM; Hanus, John M.
Subject: Flaring Event at LPC
Follow Up Flag: Follow up
Flag Status: Flagged
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoqcc. reporting (a.)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 09/15/2017 00:05 and stopping at 09/15/2017 01:10 with a volume of 6880
(MSCF). The event lasted for 65 minutes and was due to reinjection compressor 1807 tripping offline for an unknown
cause. The event stopped when 1807 was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY RF'PnRT r%A
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/20/2017 06:03-06:56 3,225
10/20/2017 07:50-07:52 30
10/20/2017 18:29 -18:32 59
Total Flom <=1 Hour 3,314
10/19/2017 20:59-22:36 6,172
Total Flare > 1 Hour
6,172
Volume Flared
8,486
Measured Safety Pilot
7,408
Continuous Assist
83,101
TOTALFUlRED
99,987
1807 Reinjection compressor shutdown because of Field production was cut to lower gas
control/Instrumentation failure associated with bad relay. U production until 1807 T/C restarted
1807 Reinjection compressor shutdown because of Field production was cut to lower gas
control/instrumentation failure associated with bad relay. U production until 1807 T/C restarted
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of failed start T/C, and stabilized facility process and
due to fire eyes not working correctly. U operation.
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of T/C, and stabilized facility process and
control/instrumentation failure associated with bad relay. U operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -17
VOLUME PLANNED
DATE TIME )MscF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare> I Hour 81
Volume Flared 131
Measured Safety Pilot 70
Continuous Assist 791
TOTAL FLARED 992
1807 Reinjection compressor shutdown because of
Field production was cut to lower gas
10/20/2017 06:03 -06:56
49
control/instrumentation failure associated with bad relay.
U production until 1807 TIC restarted
1807 Reinjection compressor shutdown because of
Field production was cut to lower gas
10/20/2017 07:50-07:52
0
control/instrumentation failure associated with bad relay.
U production until 1807 T/C restarted
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of failed
T/C, and stabilized facility process and
10/20/2017 18:29-18:32
1
start due to fire eyes not working correctly.
U operation.
Total Flare <=1 Hour
50
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of
T/C, and stabilized facility process and
10/19/2017 20:59-22:36
81
control/instrumentation failure associated with bad relay.
U operation.
Total Flare> I Hour 81
Volume Flared 131
Measured Safety Pilot 70
Continuous Assist 791
TOTAL FLARED 992
BP EXPLORATION ALASKA, INC,
:CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -17
VOLUME PLANNED
DATE TIME IMscij DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1807 Reinjection compressor shutdown because of
Field production was cut to lower gas
10/20/2017 06:03-06:56 152 control/instrumentation failure associated with bad relay.
U production until 1807 T/C restarted
1807 Reinjection compressor shutdown because of
Field production was cut to lower gas
10/20/2017 07:50-07:52 1 control/instrumentation failure associated with bad relay.
U production until 1807 T/C restarted
TOTAL FLARED
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of failed
T/C, and stabilized facility process and
10/20/2017 18:29-18:32 3 start due to fire eyes not working correctly.
U operation.
Total Fore <=1 Four 156
10/19/2017 20:59-22:36 244
Total Flare -1 Hour
244
Volume Flared
400
Measured Safety Pilot
251
Continuous Assist
2,817
TOTAL FLARED
3,468
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of T/C, and stabilized facility process and
control/instrumentation failure associated with bad relay. U operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1807 Reinjection compressor shutdown because of
10/20/2017 06:03 -06:56 323 control/instrumentation failure associated with bad relay.
Field production was cut to lower gas
U
Volume Flared
production until 1807 T/C restarted
1807 Reinjection compressor shutdown because of
10/20/2017
Field production was cut to lower gas
07:50 - 07:52 3 control/instrumentation failure associated with bad relay.
U production until 1807 T/C restarted
TOTAL FLARED
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of failed start
T/C, and stabilized facility process and
10/20/2017 18:29-18:32 6 due to fire eyes not working correctly.
U operation.
Total Flare <=1 Hour 332
10/19/2017 20:59-22:36 987
Total Flare> I Hour
987
Volume Flared
1,319
Measured Safety Pilot
954
Continuous Assist
10,710
TOTAL FLARED
12,983
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of T/C, and stabilized facility process and
control/instrumentation failure associated with bad relay. U operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -17
VOLUME PLANNED
DATE TIME (MSCFj DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r— I Hour 530
10/19/2017 20:59-22:36 2,341
Total Flare> 1 Hour
1807 Reinjection compressor shutdown because of
Field production was cut to lower gas
10/20/2017 06:03-06:56
516 control/instrumentation failure associated with bad relay.
U production until 1807 T/C restarted
Continuous Assist
1807 Reinjection compressor shutdown because of
Field production was cut to lower gas
10/20/2017 07:50-07:52
5 control/instrumentation failure associated with bad relay.
U production until 1807 T/C restarted
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown because of failed
T/C, and stabilized facility process and
10/20/2017 18:29 -18:32
9 start due to fire eyes not working correctly.
U operation.
Total Flare r— I Hour 530
10/19/2017 20:59-22:36 2,341
Total Flare> 1 Hour
2,341
Volume Flared
2,871
Measured Safety Pilot
2,812
Continuous Assist
31,444
TOTALFLARED
37,127
Completed trouble shooting, reloaded 1807
1807 Reinjection compressor shutdown bemuse of T/C, and stabilized facility process and
control/instrumentation failure associated with bad relay. U operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > I Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c_ 1 Hour 0
Total Flare s 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, October 31, 2017 8:24 AM
To: Blake, Jennifer J; 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Starck, Jennifer L; AK, HSSEE
Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin; Buckbee, Rachel A; AK, OPS
GPMA OSM; Hanus, John M.
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reporting(Lba laska. gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 10/19/2017 20:59 and stopping at 10/19/2017 22:36 with a volume of 9825
(MSCF). The event lasted for 97 minutes and was due to 1807 reinjection compressor shutting down due to a
control/instrumentation failure. The event stopped when maintenance finished troubleshooting and the compressor was
brought back online.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT (W DR/lni lt`=n f-�A0
1.
_ - - - - --- —
Facility Number 2. Facility Name
�• . • wrvv�.v V/1V YIVrVaI � �V�r
09 PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. 1: Vast of Disposition
Dlspositian
Volume MCF
November -2017
20. For production from multiple pools, list contribution of each pool as a percent of
119,652
Total Volume.
FFlared
Pool Name
Pool Code Percent
d
11,138,048
Sadlerochit
640150 °
8.9 /o
North Prudhoe Ba State
640152 0.0%
vented 1 hour or less
0
PointMcIntyre
640180 36,7%
Lisburne
-m
640144 52.6%
9.
Flared or vented more than 1 hour (see instr)
0
Ivishak-SagRlver test
640147 1,4%
Niakuk
640148 0.5%
10.
Pilot and Purge
11,142
West Beach
640186 0.0%
11.
Assist Gas
120,350
12.
Fuel gas used in lease operations.
875,071
13.
Other (see instructions)
2,050,231
Official Use Only
Authorization >I hr:
MCF
14.
TOTAL VOLUME (ITEMS 6-12)
14,314,494
Safety
15.
NGL Gas Equivalent
MCF
119,652
ELeaseUse
16.
Purchased gas
n MCF
0
Waste:
MCF
17.
Transferred from:
2,824,284
18.
Transferred to: (Express as a negative #)
0
Commissioner
Date
19.
Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe
= 2,824,284 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas equivalent) = 9,966
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature
(2�
Note: All volumes must be corrected
---a#
Title Manager Production Taxes and Ro alties Alaska
to pressure of 14.65 psis and to a
Printed Name Diane Colley
Phone (907) 564-5775
(
temperature of 60o F. Authority 20
Date
AAC25.235.
Form 10-422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare> 1 Hour 0
Volume Flared
Measured Safety Pilot 5,844
Continuous Assist 63,132
TOTAL FLARED 68,976
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -17
VOLUME
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 4,105
Continuous Assist 44,337
TOTALFLARED 48,442
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS $ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 51
Continuous Assist 546
TOTALFLARED 597
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 151
Continuous Assist 1,629
TOTAL FLARED 1,780
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 991
Continuous Assist 10,706
TOTALFLARED 11,697
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I December -2017
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
127,309
Pool Name Pool Code Percent
7. Reinjected
12,221,338
Sadlerochit 640150 8.7%
North Prudhoe Bay State 640152 0.0%
8. Flared or vented I hour or less
0
Point McIntyre 640180 32.5%
Lisburne 640144 56.8%1
9. Flared or vented more than 1 hour (see instr.)
363
Ivishak-SagRiver test in 640147 1.4%Niakuk
640148 0.6%
10. Pilot and Purge
11,394
West Beach 640186 0.0%
11. Assist Gas
120,220
12. Fuel gas used in lease operations.
881,024
13. Other (see instructions)
2,170,078
Official Use Only
Authonza[ion>i hr:
e#(o
�]``
Safety
Y�
3d3
MCF
14. TOTAL VOLUME (ITEMS 6-12)
15,531,746
Lease Use
MCF
15. NGL Gas Equivalent
127,309
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
3,789,719
4,-� -/5 -18
Commissioner Date
-
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 3,789,719 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas equivalent) = 13,385.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
/�7/,,y�/� .E�
Signature CIerX�11 Title Mana er Production Taxes and Ro alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Ll
Printed Name Diane Colley Phone (907) 564-5775 Date h g
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS &CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flom r_ 1 flour 0
12/16 12:00 - 12/22 04:30 211
Total Flare> 1 Hour 211
Volume Flared
211
Measured Safety Pilot
6,464
Continuous Assist
68,247
TOTALFLARED
74,922
Vented gas. Heavy snow extinguished pilots on LP liquid flare
line. U Relit after storm eased and snow was cleared.
RP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MONTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Det -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
12/16 12:00 - 12/22 04:30 131
Total Flare> 1 Hour
131
Volume Flared
131
Measured Safety Pilot
3,708
Continuous Assist
39,100
TOTAL FLARED
42,939
Vented gas. Heavy snow extinguished pilots on LP liquid flare
line. U Relit after storm eased and snow was cleared.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Det -17
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare � 1 Hour 0
12/16 12:00 - 12/22 04:30
Total Flare > 1 Hour 2
Volume Flared 2
Measured Safety Pilot
66
Continuous Assist
665
TOTAL FLARED
731
Vented gas. Heavy snow extinguished pilots on LP liquid flare
line. U Relit after storm eased and snow was cleared.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -17
VOLUME PLANNED
DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare �-1 Hour 0
12/16 12:00 -12/22 04:30
Total Flare > 1 Hour 5
Volume Flared 5
Measured Safety Pilot 163
Continuous Assist 1,711
TOTAL FLARED 1,879
Vented gas. Heavy snow extinguished pilots on LP liquid flare
line. U Relit after storm eased and snow was cleared.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -17
VOLUME PLANNED
DATE TIME )MSCf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <.1 Hour 0
12/16 12:00 - 12/22 0430 34
Total Flare> 1 Hour 34
Volume Flared 34
Measured Safety Pilot 995
Continuous Assist 10,497
TOTAL FLARED 11,526
Vented gas. Heavy snow extinguished pilots an LP liquid flare
line. U Relit after storm eased and snow was cleared.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -17
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -17
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured SatetV Pilot
Continuous Assist
TOTAL FLARED