Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-126 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. Numbe o We,, H,,tor PAGES TO DELETE Complete RESCAN ~-dlor items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages. [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Bevedy Diann~athan Lowell TO RE-SCAN Notes: Date.~7 /s/ Re-Scanned by: Beverly Dianna Vincent Nathan Lowell Date: Is~ t r" STATE OF ALASKA r"\ ALASKA ulL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 0 Oil 0 Gas 0 Plugged II Abandoned 0 Suspended 0 WAG 20AAC25.105 20AAC25.110 0 GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3358' NSL, 501' WEL, SEC. 06, T11 N, R14E, UM Top of Productive Horizon: 357' NSL, 988' WEL, SEC. 06, T11 N, R14E, UM Total Depth: 1050' NSL, 181' EWL, SEC. 05, T11N, R14E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664489 y- 5975142 Zone- ASP4 TPI: x- 664079 y- 5972132 Zone- ASP4 Total Depth: x- 665229 y- 5972850 Zone- ASP4 18. Directional Survey 0 Yes II No 21. Logs Run: MWD, LWD, GR, DIR / FE, NEU, RES Zero Other 5. Date Comp., Susp., or Aband. 3/19/2004 I . 6. Date Spudded 09/15/1995 7. Date T.D. Reached 10/03/1995 8. KB Elevation (ft): 66' 9. Plug Back Depth (MD+TVD) 10842 + 8942 10. Total Depth (MD+TVD) 10931 + 8945 .11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL No. of Completions 22. CASING, LINER AND CEMENTING RECORD SETTING DEPTH. MD 'SETTINGl)ep):H J'Vf> . Ho~ lOP' BOTTOM': :1 bpi ,BòÌTOM' SIZEr Surface 107' Surface 107' 30" 35' 3639' 35' 3624' 12-1/4" 33' 10066' 33' 8892' 8-1/2" 9995' 10931' 8877' 8945' 6" CASING . '.: SiZE 20" 9-5/8" 7" WT. PER FT. 91.5# 40# 26# 12.6# GRADE H-40 NT80 L-80 L-80 4-1/2" 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None 24. SIZE 3-1/2", 9.2#, L-80 MD TVD TVD MD 1b. Well Class: II Development 0 Exploratory 0 Stratigraphic Test 0 Service 12. Permit t~1I Number 195-126 304-062 13. API Number /' 50- 029-22587-00-00 14. Well Name and Number: PBU E-39 / 15. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Ft 16. Property Designation: ADL 028304 :: ~:[~Vfr:D M 19yOO' (Approx. Ii 0 7200 AIaIt. CW & &. ~ , . :,' C~~E~JN~'R~"f~.6ií 260 sx Arctic Set (Approx.) 1020 sx CS III. 306 sx Class 'Go, 225 sx CS II 96 sx Class 'G' 140 sx Class 'G' Ft TUBING RecoRD DEPTH SET (MD) 9347' PACKER SET (MD) 9291' 25. AOIQ; FRÁérùRE; CEMI;NT SQI,JEEZI;;ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10161' Set Whipstock ~ t>~ P&A with 39 Bbls Class 'G' .,-/ f./Git Squeezed to 2000 psi 26. Date First Production: Not on Production Date of Test Hours Tested PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-BBL GAs-McF WATER-BBL OIL-BBL GAs-McF WATER-BBL None ~Ú~I( <:.\\~~ CHOKE SIZE I GAS-OIL RATIO OIL GRAVITY-API (CORR) ORIGil\~Al Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE HIxJIIS ts~ L MAY 1 0 7004 L> \" l .r"\ r"\ 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 9286' 8390' None Shublik 9332' 8433' Sadlerochit 9411' 8503' 30. List of Attachments: Summary of Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~ ~ Title Technical Assistant Date OS ,Of.&, .0'( PBU E-39 195-126 304-062 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number P Drilling Engineer: Mary Endacott, 564-4388 ermit No.1 Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 ! ~ ,r'\ BP EXPLORATION Operations SummfJryReport Page 1 ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-39 E-39 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/15/2004 Rig Release: 3/29/2004 Rig Number: N1 Spud Date: 9/15/1995 End: 3/29/2004 ,,' i Date FfOm': Tò Hours' Task Code, NPT " Phase. DescrJpti~:~.: Qf Çperations ' \,', " 3/18/2004 03:00 - 06:30 3.50 MOB P PRE Rig released from F.46A @ 03:00Hrs on 3/18/2004. Prep to move rig off well. Clean cuttings box. 06:30 . 07:00 0.50 MOB P PRE Held pre-move safety meeting with crew, security & tool services. 07:00 - 08:00 1.00 MOB P PRE Jack-up rig & pull rig off well. Move rig to pad entrance. 08:00 - 08:30 0.50 MOB N WAIT PRE W.O. tool services to plough snow drifts on access road, lay mat boards & scarf slick areas. 08:30 - 12:00 3.50 MOB P PRE Move rig from F-pad to E-pad. Arrive @ E-pad & position rig in front of E-39. Install dikes around tree. Meanwhile Litttle Red Services loadlkill E-39 with 255bbls KCL water & 30bbls 60/40MeOH prior to rig arrival - Final injectivity = 5bpm/950psi. WHP before kill = 2450psi. lAP = 300psi. OAP = Opsi. 12:00 - 12:15 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for backing rig over well. 12:15 - 12:30 0.25 MOB P PRE Back rig over well & set down. Accept rig @ 12:30Hrs on 3/18/2004. 12:30 - 14:30 2.00 RIGU P PRE N/U BOPE. Meanwhile spot outside trailers & tanks. RIU hardline to tiger tank & P/test to 4000psi. 14:30 - 20:15 5.75 BOPSUP P PRE Grease tree valves & open SSV. Perform initial BOPE function/pressure test. AOGCC test witness waived by Jeff Jones. Meanwhile fill rig pits with 2% KCL-water. 20:15 - 21:00 0.75 BOPSUPP PRE Check well head pressure. Well head pressure is zero. Stab injector onto well and circulate MeOH out of coil. Took 36 bbls to fill the hole. 21:00-21:15 0.25 BOPSUF P PRE Unstab injector and pull back. 21:15 - 21:30 0.25 WHIP P WEXIT PJSM for PU whipstock. 21 :30 - 23:00 1.50 WHIP P WEXIT SWS install 3 RA tags in WS. MU Baker whipstock, setting tool, FAIV, MWD, orienter, MHA. Fill hole, took 8 bbls. 23:00 - 00:00 1.00 WHIP P WEXIT RIH to 800'. SHT MWD and orienter at 0.9 bpm, 1,600 psi. Continue RIH. 3/19/2004 00:00 - 02:00 2.00 WHIP P WEXIT RIH to 7,300'. Not getting returns while RIH. Circulate at 1 bpm down coil. Not able to get returns at 1 bpm. Fill hole through kill line. Took 10 bbls to fill the hole. Continue RIH pumping at .58 bpm, no returns. RIH to 9,310'. 02:00 - 02:40 0.67 WHIP P WEXIT Tie in to Sag River marker. +6' correction. 02:40 - 03:00 0.33 WHIP P WEXIT RIH to 10,189'. 03:00 - 03:40 0.67 WHIP P WEXIT Confirm tie in from 10,189' to 10,209'. 03:40 - 04:15 0.58 WHIP N SFAL WEXIT Attempt to orient WS. Unable to orient. Current TF is 164L. Discrepency with MWD time/Depth file on 2nd tie in. Relog from 10,189' to 10,209'. -5' correction. No retums during tie in logs. 04:15 - 04:50 0.58 WHIP P WEXIT Place whipstock top at 10,185'. Increase pump rate to 1.87 bpm, 4,200 psi. Bleed off pressure and let sit for 1 minute. Bring pump up to .9 bpm, 1,500 psi. FAIV is not shifted. Got a click, TF=147L. Bleed off pressure and let sit for 5 minutes. Bring up pump to 1.24 bpm, 2,205 psi. TF=125L. 04:50 - 05:10 0.33 WHIP P WEXIT Orient to 123R at 1.2 bpm. 05:10 - 05:20 0.17 WHIP P WEXIT Pump at 1.89 bpm, 4,750 psi. Bleed off pressure. Bring up pump and set whipstock. Whipstock sheared at 2,100 psi. TF after shearing off WS is 145R. Shut down pump and set down 2K. PU=33K. 05:20 - 06:00 0.67 WHIP P WEXIT POOH. Hanging up in jewelry while POOH. Pull through nipples at 9,335' and 9,316' with 41K Ibs. POOH. Printed' 312912004 8:47.21 AM .r---. 1'""\ Page 2 - BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-39 E-39 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Date Fróm' - To'HoursTaskCode NPT 'Phasé, 3/19/2004 06:00 - 07:30 1.50 WHIP P WEXIT 07:30 - 08:10 0.67 ZONISO P WEXIT 08: 1 0 - 11 :00 2.83 ZONISO P WEXIT 11:00-11:15 11:15-12:45 0.25 ZONISO P 1.50 ZONISO P WEXIT WEXIT 12:45.13:15 0.50 ZONISO P WEXIT 13:15 - 13:45 0.50 ZONISO P WEXIT 13:45 - 14:20 0.58 CLEAN P WEXIT 14:20 - 15:10 0.83 CLEAN P WEXIT 15:10 - 15:50 0.67 CLEAN P WEXIT 15:50 - 17:45 1.92 ZONISO P WEXIT 17:45 - 18:00 0.25 ZONISO P WEXIT 18:00 - 19:15 1.25 CLEAN P WEXIT 19:15 - 19:30 0.25 CLEAN P WEXIT 19:30-19:45 0.25 STWHIP P WEXIT 19:45 - 20:15 0.50 STWHIP P WEXIT 20:15 - 20:25 0.17 STWHIP P WEXIT 20:25 - 22:00 1.58 STWHIP P WEXIT 22:00 - 22:40 0.67 PXA P WEXIT 22:40 - 22:46 0.10 STWHIP P WEXIT 22:46 - 23:00 0.23 STWHIP P WEXIT 23:00 - 00:00 1.00 STWHIP P WEXIT Start: 3/15/2004 Rig Release: 3/29/2004 Rig Number: N1 Spud Date: 9/15/1995 End: 3/29/2004 , , ""':Description of Operations:,.'" COH. PJSM. SIB injector. UD whipstock setting BHA#1. Set tool packed with asphaltenes. MIU cement squeeze BHA#2 with 2-1/4" nozzle, 2" CSH Stinger, X/O & CTC. Stab injector on well. Meanwhile R/U Dowell cementers. RIH with BHA#2 circ @ 2.7bpm/3700psi without retums. Start seeing returns after pumping 26bbls. Continue RIH to 9500' (below tbg tail) circ @ 1.2I0.2bpm & 850psi. Up wt check @ 9500' - 31.5klbs. PUH into tbg tail to 9175' (above all X-nipples) - no a/pulls. Continue RIH to WS pinch Pt tagged 2x @ 10157'. Correct CTD (+30') to 10187'. SLB mech depth counter is 34' off while Sperry counter is 13' off. Review tie-in & reconfirm W/S tag depth. PUH to 10175' & flag CT. PJSM with all personnel concerning cementing operations. ~p p bbls of water ahead. PT cement lines to 4k. Pump 39bb of 15.8ppg class G cmt slurry @ 1.95/0.65bpm & - psi. Follow with 5bbls of water behind. Chase with KCL-water @ 1.5/0.60bpm & 1550psi. Pump 1 bbl of cmt around nozzle. POOH laying in remaining cmt @ 1:1 to 8667' - (TOC). Observe retums gradually improve to 1:1 @ 1.47/1.24bpm & 1000psi while laying-in cmt. CIP @ 12:30. PUH to 7500'. SI choke & increase WHP to 1000psi. Hesitate-squeeze from 1000psi - 1500psi. Gradually increase squeeze pressure to 2000psi. Squeezed away ca. 1.5bbls cmt. Circ down 30bbls bio-KCL water to nozzle @ 2.2I2.2bpm & holding 1000psi WHP. RBIH contaminating cmt @ 1:1 & 500psi WHP. Observe slight CTP bump @ 8840' (TOC). Continue washing down to 10175'. Wash up to 8800' @ 2bpm/3500psi. Start getting contaminated cmt on surface @ 8840' btms up. Out wt climb up to a max of 12ppg. Make additional 2 down & 1 up wash passes @ 2.0bpm/2700psi. Jet COH @ 2.0bpm/27oopsi. Tag up with 36.6' CTD on SLB depth counter - BHA length '" 10.84'. COH. UD cementing nozzle BHA#2. MIU swizzle stick. Stab on injector & jet BOP stack. Flush surface lines. Pull back injector. LD swizzle stick. PJSM for PU window milling BHA. PU window milling BHA. Stab injector. RIH to 10,100'. Pressure up well bore to 1000 psi. Pressure bled off to 500 psi in 2 minutes. Bleed off pressure. Open up well and circulate at 1 bpm. Getting full retums. SI well and retest with same results. Discuss with Anchorage. RIH to mill window. Tag at 10,161.5', PU and retag. Mill to 10,161.7'. Stalled motor, pinch point. Correct depth to 10,187'. TIme mill window from 10,187' to 10,188'. Pronted: 3129/2004 8:47:21 AM ~ . .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ~ "....... BP EXPLORATION Operations Summary Report E-39 E-39 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Date :From .'l'ö'Hburs Task Code NPT Phase 3/20/2004 00:00 - 06:00 06:00 - 08:30 6.00 STWHIP P WEXIT 2.50 STWHIP P WEXIT 08:30 - 09:30 1.00 STWHIP P WEXIT 09:30 -11:00 1.50 STWHIP P WEXIT 11 :00 - 11 :45 0.75 STWHIP P WEXIT 11:45 - 12:00 12:00 - 13:00 13:00 - 15:15 0.25 DRILL P PROD1 1.00 DRILL P PROD1 2,25 DRILL P PROD1 15:15 - 15:25 0.17 DRILL P PROD1 15:25 - 16:10 0.75 DRILL P PROD1 16:10 - 16:25 0.25 DRILL P PROD1 16:25 - 17:15 0.83 DRILL P PROD1 17:15 - 17:30 0.25 DRILL P PROD1 17:30 - 18:15 0.75 DRILL P PROD1 18:15 - 18:30 18:30-20:35 20:35 - 22:10 22:10 - 23:00 ------ PROD1 PROD1 PROD1 PROD1 1.00 DRILL 1.00 DRILL P P PROD1 PROD1 Page 3 ~ Start: 3/15/2004 Rig Release: 3/29/2004 Rig Number: N1 Spud Date: 9/15/1995 End: 3/29/2004 Description of Operations Continue time milling window. Motor stalls at 10,192.5'. Break into formation at 10,192.6'. Mill formation to 10,203'. Tentative window depths are: TOWS = 10185', TOW = 10187'; BOW = 10193', RA PIP Tag = 10192'. Backreamlream window/rat hole several times. Attempt to drift window 2x without pumping - stacking out @ 10187' (TOW). Reamlbackream TOW area without motorwork. Drift again & stack out @ TOW. Set down 3k. Roll pumps & fall thru window. SID pump & drift rest of window/rat hole OK. PUH dry - no a/pulls. Suspect WS ramp may have been slightly shaved while milling LS window & we're currently stacking out @ shaved area. Otherwise window looks clean. Continue drifting/reaming window while swapping well bore to reconditioned 8.6ppg flopro mud. Meanwhile Phase-1 declared in all GPB main roads & pads. Paint EOP flag @ 10000' & POOH window milling BHA#3. COHo PJSM. SIB injector. Flush BHA. UD 2jts of 2-1/16' CSH tbg, motor, diamond string reamer & window mill. Window mill gauge 2.73' go / 2.72' no-go & center wear indicates mill crossed lor wall. String reamer gauge 2.74' go / 2.73' no-go. Held pre-spud operations/safety meeting. Reviewed well plan, potential hazards & BHA M/U procedures. Also reviewed safety & emergency procedures for handling Sperry MWD lithium batteries. M/U & lock tite drilling BHA #4 with used HYC DS100 2.7' x 3' bicenter bit, 2deg BHI Xtreme motor, Sperry GR-DIR MWD, orienter & BKR MHA (OAL = 59.58'). Scribe tools. M/U injector. RIH drilling BHA #4. SHT MWD & orienter @ 1000' - OK. Continue RIH. Correct +27' @ the flag. RIH dry & tag window @ 10190'. PUH & orient TF from 20L to 100R. RBIH & set down again @ widow. Orient to 136R & RIH clean thru window with pumps off. Tag TD @ 10206'. Correct CTD to 10203'. Orient TF to 174L. Resume drilling with LS TF, 1.55/1.55bpm, 3350/35OOpsi, 2Ofph ave ROP. Drill to 10213' & see hi GR spike @ 1 PUH to 9924' for tie-in log. GPB now in Phase- all main roads & Phase-2 on all pads & access r Log down GR & tie-into formatio er @ 9945' - subtract 26' from CTD. RIH clean thru win 10187'. Drill 215' with LS TF, 1.55/1.55bpm, 3350/3700psi, 2Ofph e ROP. See RA PIP Tag @ 10168'. Confirmed window depths are: TOWS = 10161', TOW = 10163'; BOW = 10169', RA PIP Tag = 10168'. Orient TF to 20L. Drill to 10,263'. POOH to PU 1st lateral drilling assembly. Pull back injector. Change bit and motor bend to 1.1 deg. Check orienter, ok. Stab injector. RIH. RIH. Orient to 130R. Run through window smooth w/o pump. Fronted: 3I29l2OO4 8:47.21 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 v-J 4~ 2-/ ~ 7/1-C'o tj OI~ 2/'¿ '1/ <J-.~- ~:,~....,:.., ,~~\':.I'''¡'ë t.....,,,,, 1;: \i, ,"'"' I,""" f'"''' i f'- ~ ~ / t-~^" .l~~." I\,,,J' .'."", 'ti;. i,."~,, FEB 2 6 2004 1 . Type of Request: t~.~~..~ .:, ;~; : , '. ,",1 ':.,.~L ¡....ID > 3, 0n:'.: ',1 ,,';; ~ Abandon 0 Suspend 0 Operation Shutdown 0 Perforate 0 Waiver 0 Othètr'~)',)i'":~>:: 0 Alter Casing 0 Repair Well 181 Plug Perforations 0 Stimulate 0 Time Extension 0 Change Approved Program 0 Pull Tubing 0 Perforate New Pool 0 Re-Enter Suspended Well 0 Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. 195-126 ../" 181 Development D Exploratory 3. Address: D Stratigraphic Test D Service 6. API Number: / P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22587-00-00 7. KB Elevation (ft): 66' 9. Well Name and Number: PBU E-39 ./ 8. Property Designation: 10. Field / Pool(s): , ADL 028304 Prudhoe Bay Field / Prudhoe Bay Pool / 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10931 8945 10842 8942 9335 None Casing Length Size MD TVD Burst Collapse Structural Conductor 107' 20" 107' 107' 1490 470 Surface 3604' 9-5/8" 3639' 3624' 6870 4760 I nterm ed ¡ate 10033' 7" 10066' 8892' 7240 5410 Production Liner 936' 4-1/2" 9995' - 10931' 8877' - 8945' 8430 7500 Perforation Depth MD (ft): I Perforation Depth TVD (It): I Tubing Size: Tubing Grade: I Tubing MD (ft): 9940' - 10820' 8861' - 8940' 3-1/2",9.2# L-80 9347' Packers and SSSV Type: 7" x 3-1/2" Baker 'S-3' packer; Packers and SSSV MD (ft): 9291' 3-1/2" HES SSSV Landing Nipple 2187 12. Attachments: 13. Well Class after proposed work: 181 Description Summary of Proposal D BOP Sketch 0 Exploratory 181 Development D Service D Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: March 8, 2004 / DOil DGas D Plugged 181 Abandoned 16. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL Cornrnission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mary Endacott. 564-4388 Printed Name Mary Endacott Title CT Drilling Engineer Signature '1IYJIMU W'J1 dO f.A ú-L ~/;. . Prepared By Name/Number: Phone 564-4388 Date 2. 2 (t;/()LL Terrie Hubble, 564-4628 I iJ - Commission Use Only , I ' Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: 3ð~ - ð4:J--J-. 0 Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance Other: Subsequent fOZùired - ~ 1 BM5 BtL MAR Û j~ 10l\\ õ It fttf Approved sL J (It BY ORDER OF COMMISSIONER THE COMMISSION Dat.e Form 1 0-403 ~d ~3 "' S/bmlln Dûplicate ~Qn SG¡~NNED MJH~ ]. 5 2004 OR\G\NAL bp To: Winton Aubert Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Mary Endacott CTD Engineer Date: Feb. 26, 2004 Re: CTD Sidetrack of well E-39 E-39 is scheduled for a thru-tbg sidetrack with CTD rig, Nordic 1. From a window in the 4 1/2" liner, milled off ,/ of a mechanical whipstock, E-39A will build from Zone 1 kick off point, to a Z1 B target. A cement ./ downsqueeze will P&A the parent well perfs. The following describes work planned to prep for sidetracking and is submitted as an attachment to Form 10- 403. A schematic diagram of the proposed sidetrack is attached for reference. 1. Confirm mechanical integrity 2. Set through tæbiVl{hiPstock 3. Down squeez 20þ}~1 13.8ppg cement. 4. Clean out to r~tock 5. Pressure test squeeze to 1000psi Work will likely be performed in the 2nd week of March. Nordic 1 is scheduled to arrive on the well - 18th March. /l).. J~cdt M.S. Endacott CTD Drilling Engineer CC: Well File Terrie Hubble TREE = 4-1/16" SM CÞN W8..LHEAD = 9-S/8" SM H/C ACTU4. TOR = BAKffi KB. ELEV = 66.0S' BF. ELEV = 30.50' KOP= 3397' Max Ange = 92 @ 10427' DatumMD= 9956' Datum TVD = 8800' SS 9-5/8" CSG, 47#, NT -80. ID = 8.681" Minimum ID = 2.75" @ 2187' 3-1/2" SSV LANDING NIPPLE 3-1 {2" lBG. 9.2#, L-80, .0087 bpf, ID = 2.992" 9347' TOP OF 4-1 {2" LNR 7" CSG. 26#, L-BO, ID = 6.276" PERFORATION SUMMA. RY REF LOG: SPERRY Sl.J'. MND ON 09/2319S ANGLEA TTOP ÆRF: 69 @ 9940' N:Jte: Refer to A-oductbn œ for historical perf data SIZE SPF INlERV A L OpnlSqz DA. TE 2-1/4" 6 9940 - 9955 0 02l15.()3 2-1 (2" 6 10020 - 1 0040 0 11/21196 2-1{2" 4 10090 -10110 0 09/12196 2-3/4" 4 10110 - 1 0150 0 09112196 2-3/4" 4 10170 - 1 0330 0 1 0/07195 2-314" 4 10400 - 1 0590 0 10/07195 2-3/4" 4 10640 - 1 0820 0 10107195 E-39 / I SAFETY NOTES: HORIZONTAL WELL (f) 3-1/2" HES SSSV LAND NIp, ID = 2.75' GAS LIFT MANDRELS ST fill) TVD DEV lYPE VLV LA TŒi PORT DA.lE 2 4257 4131 28 CAM "*DMY RK 0 09/02103 1 7466 6743 36 CAM "*DMY RK 0 09/02103 U STA # 1 & 2 = D\1Y VLV HA.S EXTEf\I)EÐ PACKING 9279' 3-1/Z' HES X NIP, ID = 2.75' 7" X 3-1{2" BKRS3 PKR. ID = 3.87S" X PLUG (07/15103) 3-1/Z' WLEG, ID= 2.75" H ELMDTT LOGGED 03/31/96 I 4-1IZ' Lt'-R, 12.6#. L-80. .0152 bpf, ID = 3.953" DAlE REV BY CO~1fvENTS DATE REV BY OOMv1ENTS 10107/95 ORlG HORIZ COM PLETION 09106101 RNITP CORREC1l0NS 02115/03 FW 6'tlh A I:PffiFS 07/15/03 FW6'KK GLV C/O; SET" TIP 09102103 DTRA<K GLV C/O 10104103 DA.CITLP EXTEII[)EÐ A<G ON STA #1-2 PRUDHOE BAY UNIT W8..L: E-39 ÆRMT N:J: 1951260 API N:J: 50-02~22S87-00 SEC6, T11N, R14E, 1921.74' FI\l. & S01' ÆL I3P Exploration (Alaska) TREE,= 4-1/16" 5M crvv E-39A / I WELLHEAD = 9-5/8" 5M FMC ACTUATOR = BAKER KB. ElEV = 66.05' BF. ElEV = 30.50' KOP= 3397' Max Angle = 92 @ 10427' Datum MD = 9956' Datum lVD = 8800' SS SAFETY NOTES: HORIZONTAL WELL Proposed CTD Sidetrack <i) -13-1/2" HES SSSV LAND NIP, 10 = 2.75" I 9-5/8" CSG, 47#, NT-80, 10 = 8.681" I GAS LIFT MANDRElS ST MD lVD DEV ìYÆ VLV LATCH PORT DATE 2 4257 4131 28 CAM **DMY RK 0 09/02/03 1 7466 6743 36 CAM **DMY RK 0 09/02/03 Minimum ID = 2.75" @ 2187' 3-1/2" SSV LANDING NIPPLE ** STA # 1 & 2 = DMY VLV HAS EXTENDED PACKING TOPOF 4-1/2" LNR I -i 3-1/2" HES X NIP, ID = 2.75" I -17" X 3-1/2" BKR S3 PKR, 10 = 3.875" I I Top of 2-3/8" liner I -13-1/2" HES X NIP, 10= 2.75" I -i 3-1/2" HES X NIP, 10 = 2.75" I 3-112" WLEG, 10 = 2.75" ElMO TT LOGGED 03/31/96 13-1/2" TaG, 9.2#, L-80, .0087 bpf, 10 = 2.992" I I Top of Cement I 7" CSG, 26#, L-80, ID = 6.276" I ÆRFORA TION SUMMARY REF LOG: SÆRRY SUN MWO ON 09/23/95 ANGLEATTOPÆRF: 69 @ 9940' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz OATE 2-1/4" 6 9940 - 9955 isolated proposed 2-1/2" 6 10020 - 10040 isolated proposed 2-1/2" 4 10090-10110 isolated proposed 2-3/4" 4 10110 - 10150 isolated proposed 2-3/4" 4 10170 - 10330 isolated proposed 2-3/4" 4 10400 - 10590 isolated proposed 2-3/4" 4 10640 - 10820 isolated proposed I tVlechanical Whipstock I 4-1/2" LNR, 12.6#, L-80, .0152 bpf, 10 = 3.953" I TREE= 4-1/16" 5MCIW WELLHEAD = 9--5/8" 5M FM( ACTUATOR = BAKER KB. ELEV = 66.05' BF. ELEV = 30.50' KOP = 3397' Max Angle = 92 @ 10427' Datum MD = 9956' Datum TVD: 8800' SS I 9-5/8"CSG, 47#,NT-80,1D:8.681" I--~ 3639' Minimum ID = 2.75" @ 2187' 3-II2" SSV LANDING NIPPLE I 3-1/2" TBG, 9.2#, L-80, .0087 bpf, D = 2.992" Id E-39 9347' 9995' 10066' ti SAFETY NOTES: HORIZONTAL WELL 2187' H3-1/2. HEE; SSSV LANDNIP, ID: 2.75" GAS LIFT MANDRB. S 9279' 9291' 9316' 9335' 9347' 9350' Id3-1/Z' HES X NIP, ID= 2.75" I 1-17"x ~-1/2" BKRS3 P.~ ,O= 3.875" I PERFORATION SUMMARY REF LOG: SPERRY SUN MWD ON 09/23/95 ANGLE AT TOPPERF: 69° @ 9940' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/4" 6 9940 - 9955 O 02/15/03 2-1/2" 4 10090 - 10110 O 09/12/96 2-1/2" 6 10020 - 10040 O 11/21/96 2-3/4" 4 10110 - 10150 O 09/12/96 2-3/4" 4 10170 - 10330 O 10/07/95 2-3/4" 4 10400 - 10590 O 10/07/95 2-3/4" 4 10640 - 10820 O 10/07/95 ~ I-[ ~o~4~' I 4-1/2"LNR, 12.6/~,L-g0,.0152bpf, ID=3.953" Id 10932' I lO/O7/951I OR~eHORIZ COMPLETION 02/27/01I SIS-be IFNAL ~/o6/Oll RN/','~' ICOR~OT~O~ PRUDHOE BAY UNIT WELL: E-39 PERMIT No: 1951260 APl No: 50-029-22587-00 Sec. 6, T11N, R14E BP Exploration (Alaska) i" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X ADD PERFS Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development _X Explorato~._ Stratigraphic__ Service__ 4. Location of well at surface 1922' FNL, 500' FEL, Sec. 06, T11 N, R14E, UM At top of productive interval 4921' FNL, 189' FEL, Sec. 06, T11N, R14E, UM At effective depth 4283' FNL, 5170' FEL, Sec. 05, T11 N, R14E, UM At total depth 4229' FNL, 5099' FEL, Sec. 05, T11N, R14E, UM (asp's 664489, 5975142) (asp's 664877, 5972150) (asp's 665159, 5972795) (asp's 665229, 5972850) 12. Present well condition summary Total depth: measured true vertical 10931 feet Plugs (measured) 8944 feet Effective depth: measured 10842 feet Junk (measured) true vertical 8941 feet 6. Datum elevation (DF or KB feet) RKB 66 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number E-39 9. Permitnumber/approvalnumber 195-126 10. APInumber 50-029-22587-00 11. Field / Pool Prudhoe Bay Oil Pool Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 107' 20" 260 sx ArcticSet 143' 143' Surface 3603' 9-5/8" 1020 sx CS III, 375 sx 3639' 3624' Intermediate 10030' 7" 96 sx Class 'G' 10066' 8892' Liner 9058' 4-1/2" 140 sx Class 'G' 9995'- 10932' 8877'- 8945' Perforation depth: measured Open Perfs 9940'-9055', 10020'-10040', 10090'-10150', 10170'-10330', 10400'-10590', 10640'- 10820' true vertical Open Perfs 8861'-8163', 8883'-8887', 8897'-8906', 8908-891.,6:, .8920', ' .... 8924'-8940' Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80 Tubing to 9291', with 3-1/2" tubing tail to Packers & SSSV (type & measured depth) 7" Baker S-3 Packer @ 9291'. 3-1/2" HES SSSVLN @ 2187'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 02/14/2003 Subsequent to operation 02/16/2003 OiI-Bbl SHUT-IN Representative Daily Averaqe Production or Injection Data Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure 299 14791 55 1240 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations _ 16. Status of well classification as: Oil _X Gas _ Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~,,~~~._~~ Title: Techical'Assistant DeWayne R. Schnorr Form 10-404 Rev 06/15/88 Date February 25, 2003 Prepared by DeWayne R. $chnorr 564-5174 ~L~ ~:::','~,~ ,~....,.~, ~,...'~ SUBMIT IN DUPLICATE E-39 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 01/24/2003 ANN-COMM (AC-EVAL AND REPAIR): AC-FLUID LEVEL 01/28/2003 PERFORATING: DRIFT/TAG 02/15/2003 PERFORATING: PERFORATING 02/16/2003 TESTEVENT--- BOPD: 81, BWPD: 27, iVlCFPD: 23,948, AL RATE: 0 EVENT SUMMARY 01/24/03 T/I/O=SI/640/VAC OA FL NEAR SURFACE (FOR W/C). 01/28/03 <<< WELL SHUT-IN ON ARRIVAL. >>> DRIFTED WITH 2.5" DUMMY GUN TO 9984' WLM. <<< LEFT WELL SHUT-IN >>> 02/15/O3 PERFORATE INTERVAL: 9940'-9055'. 2-1/4" HSD PJ 2306 GUN - 6 SPF / 60 DEG RANDOM. RIH WITH 15' GUN STRING. PERFORATE INTERVAL REFERENCED TO SPERRY SUN MWD 9/23/95 AND TIED INTO GR ON PDS JEWELRY LOG 3/31/96 (2' DIFFERENCE.) WELL LEFT SHUT IN, DSO NOTIFIED. WILL POP WELL IN AM AND TEST. 02/16/03 TESTEVENT--- BOPD: 81, BWPD: 27, rvlCFPD: 23,948, AL RATE: 0 FLUIDS PUMPED BBLS 0 PRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (0 TESTS) 0 TOTAL ADD PERFS 02/15/2OO3 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2-1/4" PJ 2306, LOADED 6 SPF, RANDOM ORIENTATION. 9940'-9055' Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate _ Microbe Treatment Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 1922' FNL, 500' FEL, Sec. 06, T11N, R14E, UM At top of productive interval 4921' FNL, 189' FEL, Sec. 06, T11 N, R14E, UM At effective depth 4283' FNL, 5170' FEL, Sec. 05, T11 N, R14E, UM At total depth 4229' FNL, 5099' FEL, Sec. 05, T11N, R14E, UM 5. Type of Well: Development __X Explorato~._ Stratigraphic__ Service__ (asp's 664489, 5975142) (asp's 664877, 5972150) (asp's 665159, 5972795) (asp's 665229, 5972850) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 107' Surface 3603' Intermediate 10030' Liner 9058' 10931 feet Plugs (measured) 8944 feet 10842 feet Junk (measured) 8941 feet 6. Datum elevation (DF or KB feet) RKB 66 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number E-39 9. Permit number / approval number 195-126 10. APl number 50-029-22587-00 11. Field / Pool Prudhoe Bay Oil Pool Size Cemented Measured Depth True Vertical Depth 20" 260 sx ArcticSet 143' 143' 9-5/8" 1020 sx CS III, 375 sx 3639' 3624' 7" 96 sx Class 'G' 10066' 8892' 4-1/2" 140 sx Class 'G' 9995'- 10932' 8877' - 8945' Perforation depth: measured Open Perfs 10020- 10040, 10090- 10150, 10170- 10330, 10400- 10590, 10640 - 10820 true vertical Open Pads 8883'-8887',8897'-8906',8908'-8916', 8917'-8920', 8924'-8940' Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) 3-1/2", 9.2#, L-80 Tubing to 9291', with 3-1/2" tubing tail to 9347'. 7" Baker S-3 Packer @ 9291'. 3-1/2" HES SSSVLN @ 2187'. RECEIVED 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure MAR 14. Prior to well operation 03/03/2002 Subsequent to operation 03/20/2002 OiI-Bbl 486 Representative Daily Average Production or Iniection Data Gas-Mcf Water-Bbl 16276 16 456 16351 26 Casing Pressure Tubing Pressure 921 889 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations __ 16. Status of well classification as: Oil _X Gas _ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~ ,~'~~~)~ Title: Techical Assistant · DeWayne R Schnorr Form 10-404 Rev 06/15/88 · Date March 25, 2002 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLIC^TE E-39 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 01/29/2002 01/30/2002 02/01/2002 O2/O7/2OO2 O2/O8/2OO2 O2/O8/20O2 03/05/2002 ANN-COMM (WAIVER COMPLIANCE): AC-EVAL; AC-FLUID LEVEL ANN-COMM (WAIVER COMPLIANCE): AC-LOAD ANN-COMM (WAIVER COMPLIANCE): AC-EVAL; AC-LOAD MICROBE TREATMENT: GAS LIFT--FOR RATE; MICROBE TREATMENT MICROBE TREATMENT: GAS LIFT--FOR RATE; MICROBE TREATMENT MICROBE TREATMENT: AC-TIFL MICROBE TREATMENT: MICROBE TREATMENT EVENT SUMMARY 01/29/02 TIO: 1300/1200/200, OA FL @ 1566' 01/30/02 T/I/O: 880/1150/200. (OA LOAD, SHOE COMPETENCY SURVEY.) MIRU FIRST ENERGY, LOAD OA WITH 45 BBLS OF CRUDE. FINAL PRESSURES; 880/1150/20. 02/01/02 TIO: 1450/1300/550, IA FL @ SURFACE (POST OA LOAD). 02/07/02 SET SS CS @ 7569'. PULL 1 1/2" DGLV's FROM STA #1 & #2. SET GEN 1 1/2" LGLV & RK (1500 TRO - 1/4" PORT) IN STA #2. RUN GEN 1 1/2" OGLV (5/16" PORT). IN PROGRESS. 02/08/02 SET GEN 1 1/2" OGLV & RK (5/16" PORT) IN STA #1. PULL CATCHER. DRIFT W/2.50" CENTRALIZER & SAMPLE BAILER. OVERCOME BY DEVIATION @ 9984' WLM (10016' CORRECTED). BAILER EMPTY. RDMO. 02/08/02 T/I/O = 2380/760/140 TIFL PASSED. (PRE MICROBE TREATMENT) INITIAL IA FL @ 610' 1600 PSI DIFFERENTIAL ACROSS T & IA. MONITOR IA FOR 1 HR. IA FL STILL @ 610'. T & IA PRESSURE'S DID NOT CHANGE. FINAL WHP'S -- 2380/760/140. O3/O5/O2 535 BBL MICROBAC TREATMENT DISPLACE TO PERFS & FRZ PROTECT. WELL TO REMAIN S/I FOR 14 DAYS. FLUIDS PUMPED BBLS 1 PRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (1 TESTS) 28 50/50 METHANOL WATER 168 CRUDE 40 KCL WATER 542 MICRO-BUG JUICE 779 TOTAL Page 1 ANNULAR INJECTION DATA ENTRY SCREEN Asset .~.Q,~ .......................................... Legal Desc ;~.3.~;.8.'.bI~.I~,.~.Q.I.:~J~L,..~.e.~..6...T.::t.I.bL.B. L4E ....... : ................ · .............. Research ....................................................................................................................... ~..~~..~.~...~.o.~...~..~.~u.~...~.o..~.~.~.~.~..~:z~.~. .... Rig Name bl.~b.o.r~..~.~.[ ............................. - ................................................................................... ; ........... .~ .... Ini Well Name F..:.3.~ ............................................ Permit Start ........ .~:.~.~:.9.fi. ..... 2. Permit End .......1.~.~.1J.[t.5..,,.. ~ Sur Csg Dep ~.~.$.0. ................ ' .............................. ~' ............................... !,~ " -, . m' ~i ' i ~: . ) o__~ .,,~ ,, . .., .... ~ Cumulative Data ?jj. Rig Completion Formation. Intermittant : Final [ ~ ~ Well Total Mud/Ctg WaSh, . ~::~ El.~i~si~ ~ ii.~:~:iiii~ F!u'~..i~i'..i.i~ :.F!e~z~; ~i:I t)~.~:: .... 13 ,~.: ~E~ Wel IE-39 DaSd RigWash F-~ds 09/30/95 250 10/01/95 478 E-39 10/02/95 E-39 1 O/O3/95 65 Daily Data ............................................................... 250 478 .................................................. '325 E-39 ~10/05/95 '~5~ E-39 10/07/95 _1697 ......................................................... , ............................. ~, .............................................. ~ .................. TZ~ ~ ~ ?~/~ ~/~ ~ ~ ~ ~}~ ~`~ ~ ~ ~ ~ ~ ]Z~ ~Z)~/ ...................... L .................... I Open 700 PSi - 1995 Summary 700 PSI 65 750 PSI 75 700 PSI 80 700 PSI 525 750 PSi 80 777 800 PSI FREEZE PROTECTED ANNULUS W, ~SEL ......................................................... ......................................................................................................... L- . a jeare.d rvlces rilling 900 East Benson Boulevard, MB 8-1 · Anchorage, Alaska 99508 (907) 561-5111 Fax: (907) 564-5193 December 14, 1998 Wendy Mahan Natural Resource Manager Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501-3192 RECEIVED Re: Annular Disposal Information Request DEC 141998 Dear Ms. Mahan: Alaska Oil & Gas Cons. Com~ssion · Anchorage On October 28, 1998 you requested an update from Shared Service Drilling regarding Annular DispOsal Records from July 25, 1995 through preSent time. We compared your list with our records and are able to provide you with the following data: · Individual Annular Disposal Logs from the SSD database which coincide with the approved wells on your attached AOGCC Annular Log, The.SSD records are prOvided to yOu in the same order as listed on your log. · There were some wells on your list which were not injected into. These wells are identified as follows: · Endicott wells 1-03/P-16, 1-65/N-25, 1-59/0-24 ' · EXploration well Pete's Wicked #1 · Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30,,L-21, K-38, NMP #1 & #2, K-05, K-02, H-07, K-25, K-37, E-17, F-21, K-30, K-34, K,21i, F-66, K-06, K-54, K-33, F-49i, K-18 · PBU Wells E-38, 18-34, 15-42, 'S-29A, 15-46, B-36, 15-43, 11-38 · The reason many of these annuli were not used is because the waste materials generated from these wells were injected into other approved annuli. Hopefully the injection logs submitted with this letter will clarify this. In addition, please note that our records show: · The wells listed above in italics were permitted but not used for annular disposal, · The wells listed above in BOLD were not Permitted for annular disposal. Wells drilled after June 6, 1996 were required by SSD procedure to be permitted with a Sundry Approval (10-403) form. Our records show that no Sundry Approval for Annular Disposal was filed for these wells. Wells drilled between July 25, 1995 and June 6, 1996 were automatically approved for annular disposal with the Permit to Drill. · We also provide .you with a cumulative report from our database of records from July 25, 1995 through the present. FrOm thoSe records, we show the following wells not listed on. your report were used for annular dispOsal: ,, ,Annular Disposal Letter .'. 12/14/98 ) ! · Endicott wells i-23/O-15, 1-61/Q~20, 2-40/S-22 Exploration well Sourdoueh~ #3 - ~_.~o ~4 Milne Point wells F-06, H-05, ~-06, J-13, L-24 - qs.o~e PBU wells-18-30, 18-31, 14~,~-43, E-34, E-36, G-~A, ~d S-33-~*'~°~ ~dividud logs ~e provided to ~ou for these ~ogs as we~l. · Finally, our records show that the B-24 outer annulus was left open (see attached correspondence) Thank you for the opportunity to provide clarity to these records. If I can be of any further assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental Advisor at 564-4305. Sincerely, Fritz P. Gunkel Shared Service Drilling Manager FPG/KMT CC: Dave Wallace - HSE Manager (w/oUt attachments) RECEIVED 'i4- Alaska 0it & Gas Cons. commission Anchorage t. Shared Ser'~ice Drilling AnndTar Injection Volumes July 25, 199.5 until December 1998 Cumulative Report surface Casing Rig Inj Well Depth Legal Desc Endicott Cum Total Doyon 15 1-19/I-18 5000 Sec. 36, T12N, R16E 8,960 _ · . Doy°n 15 1-23/O-15 4246 2020'FNL, 2087'FEW, SEC.36,T12N,R16E 32,084 .. Doyon 15 1-33/M-23 5013 3217'NSL, 2114'WEL, Sec 36,T12N, R16E 9,879 Cum Mud & Ctgs 7,848 30,604 9,729 CumRig Cum Compl Cum Form Cumlnterm Cum Final Wash Fluids Fluids Freeze Freeze 992 120 _ ._ .... 1,160 200 120 . . _ 150 Disposal Period Annulus Slart End Slatus 12/5/95 12/5/96 Open . . . . 9/30/95 12/31/95 Open 8/31/95 12/31/95 Broached Doyon 15 1-61/Q-20 .4236 .3075'NSL,' 227.'_WEL, Sec .......... 13,T12N, R16E ._ 27_,.228 21,~377 . O0y0a !_5 ..... 2.:_4._0/S~.2_2 .... _4._5.~31 ........ _20~2__0' ~ _N L ,_ -_22~ 89'__ _F E_L.,, _ _S _e.c_3_6 ,_T. !. 2N_, _FI_ .1_6E ...... _31,1~9~ ........ _2_9,9_5_2__.._ EoA Doyon 14 15-47 3515 3648'NSL, 4956'WEL, Sec 22,T11N, R14E 3,002 903 2,613 1,176 60 1,063 120 60 2,009 12/5/95 12/5/96 Open 7/25/95 12/31/95 Open 90 11/7/95 12/31/95 Open )oyon 14 DS 15-45 3829 4749' NSL, 5180' WEL, Sec. 22, T11N, 1,882 1,697 134 51 4/4/96 4/4/97 Broached )_o y ?_n_ ?_ _4 .... . ..... D.S 1.5_-48 . _3_548 )oyon 14 DS 15-49 3667 Sec. 22, T11N. R14E 3,385 216. 4676' NSL, 5165' WEL, Sec. 22, T11N, 4,669 1,559 82O 2,283 66 12/21/95 12/21/96 1,141 1,904 65 2/21/96 2/21/97 )oyon 9 18-30 3930 1499'SNL, 26'WEL, Sec 24.T11N, R14E 2,266 936 380 800 150 7/25/95 12/31/95 Open )oyon 9 18-31 3680 3719'NSL, 64'WEL, Sec 24,T11N, R14E 6,086 2,250 1,100 2.565 171 7~26~95 12/31/95 Open )oyon 9 18-32 3830 3632'NSL, 41'WEL, Sec 24,T11N, R14E 3,311 1,861 200 1,100 150 8/24/95 12/31/95 Open )oyon 9 18-33 4140 3690'NSL, 56'WEL, Sec 24,T11N, R14E 5,215 2,050 3,035 10 120 9/28/95 12/31/95 Open Jabors 18E 12-35 3543 348'NSL, 705'WEL, Sec 18,T10N, R14E 3,723 3,436 137 150 9/1/95 12/31/95 Open tabors 18E 12-36 3452 63'FSL, 899'FEL, Sec 18.T10N, R15E 4,002 1,961 50 1,871 120 10/13/95 12/31195 Open labors 18E 13-36 3431 1585'NSL, 5187WVEL, Sec 13,T10N, R14E 4,137 3,-~PR 464 150 10/26/95 12/31/95 Open labors 18E 14-44 3288 2829'NSL, 1617'WEL, Sec 9,T10N, R14E 3,974 2,319 1,535 120 8/17195 12/31/95 Open xploration ool 4 Sourdough #3 4236 2245'FSL, 5067' FEL, Sec. 29, T9N, R24E 5,786 4,630 1,156 1/26/96 1/26/97 Closed lilne 27E MPK-17 3508 3648'NSL,2100'WEL, Sec.03,T12NR11E 19,608 18,538 285 685 100 4/18/96 4/18/97 Open abors 22E MPC-23 4941 1038 NSL, 2404 WEL, Sec 10,T13N, 2,060 1,800 130 130 1/25/96 1/25/97 Open abors 22E MPC-25 8595 1143'FNL, 2436'FWL, Sec 10,T13N, R10E 1,905 1,465 300 140 1/5/96 1/5/97 Open abors 22E MPC-26 4704 1086 NSL, 2419 WEL, Sec 10,T13N, 5,P2R 4,483 555 190 12/19/95 12/19/96 Open abors 22E. MPC-28 5405 Sec 10,T13N, R 10E 425 350 75 2/15/96 2/15/97 Open Open Open Page I Sha[~..d Service Drilling Annul'ar Injection Volumes July 25, 199§ until December 1998 Cumulative Report Rig Nabom 22E Nabom 22E Nabom 22E Nabors22E Sudace . Casing Inj Well. Depth MPF-06 8766 . MPF-14 6690 . .. MPF-70 7919 MPH-05 5335 Cum Mud Cum R~ Legal Desc Cum Total & Ctgs Wash Sec 06,T13N, R10E. 1~92~ .... 1,731 ....... . .. Sec'06,T13N, RlOE. UM.' . -_ . _ 18,717 17,107 1,270 2189'NSL 2591'WEL, Sec 6,T13N, R10E 19,775 18,794 735 · · . ... 2882'NSL 4028~/EL, Sec34,T13N, R10E 8,283 7.711 382 CumCompl Cum Form Cumlnterm Cum Final Fluids Fluids Freeze_ . Freeze 196 34O ....... 190 56 ._ 190 Disposal Period Annulus Starl End Slalus 1/25/96 1/25/97 Open .. 6/3/96 6/3/97 Open ..... .. . 6/17/96 6/17/97 Open 8/19/95 12/31/95 Open Nabors 22E _ Nab0rs 22E MPI-07 .. __ Nabors 22E MPJ- 13 Nabors 22E MPJ-16 Nabors 27E B-24 Nabors 27E MPF-22 MPH-06 7304 2824,.SL 4044,WE__LL_Sec ~34~T13N,_.R!OE._- 8,515 8,335 2680 2339'NSL 3906'WEL, Sec 33,T?3N_,_Rl_O_E __. 1,~80~ _ _ 1,2_8_0 . 2835 2319'NSL 3179'WEL, Sec 28,T13N, RIOE 14,127 13,292 3112 .... 4080 2317'NSL 3336'WEL, Sec 28,T13N, R10E Sec 18,T13N, R11E UM 985 915 1,468 1,396 25O 645 72 180 8/5/95 12/31/95 Open ................ 80 70 9/21/95 1 2/31/95 Open 60 130 10/17/95 12/31/95 Open 70 11/12/95 12/31/95 Open ._ _ 1/25/96 1/25/97 Open 8641 Sec 06,T13N, R10E UM 6,536 6,466 __ . . Nabors 27E MPF-25 3405 1857'NSL, 2696'WEL, sec 6,T13N. R10E 9,897 9.357 250 225 65 12/26/95 12/26/96 Open Nabors 27E MPF-37 6621 1931'NSL 2643'WEL, Sec 6,T13N, R10E 7,032 6,887 70 75 7/25/95 12/31/95 Open Nabors 27E MPF-38 8561 1994'NSL 2731'WEL, Sec 6,T13N, R10E 9,232 9,157 75 12/6/95 12/31/95 Open Nabors 27E MPF-45 6678 1979'NSL 2608'WEL, Sec 6,T13N, R10E 17,562 17.381 181 7/31/95 12/31/95 Open Nabors 27E MPF-53 6750 2028'NSL 2572'WEL, Sec 6,T13N, R10E 6,051 5.671 165 75 60 80 - 8/19/95 12/31/95 Open 70 12/1 2/95 1 2/1 2/96 Open · -- 75 8/31/95 12/31/95 Open Nabors 27E MPF-61 6585 2077'NSL 526'WEL; Sec 31,T14N, R10E 5,732 5,657 70 10/13/95 12/31/95 Open Nabors 27E MPF-62 6059 Nabors 27E MPF-69 5772 2141'NSL, 2627'WEL, Sec 6,T13N. R10E 386 316 2125'NSL, 2502'WEL. Sec 6,T13N, R10E 9,740 91665 75 8/31/95 12/31/95 Open 2237'NSL, 2555~/EL, Sec 6,T13N, R10E 8,476 7,456 40 775 65 140 9/12/95 12/31/95 Open Nabors 27E MPF-78 7085 -- Nabors 27E MPL-24 6515 3654'NSL, 5180'WEL, Sec 8,T13N, R10E 6.790 4,900 1,320 165 335 70 11/27/95 12/31/95 Open WOA 18E F-33 3570 3332'NSL, 2174'WEL. Sec 2,T11N, R13E 1,468 183 660 465 160 2/21/96 2/21/97 Open 18E F-36 3691 2642'NSL, 2878'WEL, Sec 2,T11N, R13E__ 6,963 ' 1,998 1,359 3,471 135 12/18/95 12/18/96 Open ;)oyon 9 D-30 3456' 3625' NSL, 1066' WEL, SEC. 23, T11N, 5,261 2,811 1,275 1~035 140 1/31/96 1/31/97 Open ;)oyon 9 D-31 3215 SEC. 26, T11N, R13E 150 150 4/20/96. 4/10/97 Open )oyon 9 D-33 3222 2965' NSL, 1067' WEL, SEC. 23, TllN, 4,661 2.425 2.106 130 2/21/96 2/21/97, Open qabors 18E S-43 3121' 4211'NSL,4503'WEL, SEC35.T12N.R12E 5.943 2,636 1,716 1,511 80 5/7/97 5/7/98 OPEN NOV ! ~ 2002 Page 2 Shared 5,'e~ice D~illing Ann~lhr InjeCtion Volumes July 25, 1995.. until December 1998 Cumulative Report Surface Casing Rig Inj Well Depth Nabors 28E B-33 3504' Nabors 28E E-34 3664 . . Nabors 28E E-36 3648 Nabors 28E E-37 3810 Cum Mud Cum Rig Cum Compl Cum Form Cum Interm Cum Final Legal Desc . Cum To~a! & Ctgs Wash Fluids Fluids Freeze Freeze 969'SNL, 1898'EWL, Sec 31. T11 N, R 14E 3,974 2,842 857' 195 80 _ . . 168'SNL. 500'WEL, Sec 6, T11N. R14E 9,656 7,228 1,420 858 40 110 1706'SNL. 822'WEL, Sec 6,T11N, R 14E 9,271 4,417 1,293 3,096 365 100 3391'NSL, 881'WEL, Sec 6,T11N, R14E 4,695 4.241 374 80 Disposal Period Annulus Start End Slatus 5/1/96 12/31/96 Broached .. 8/23/95 12/31/95 Open 7/25/95 12/31/95 Open ·. 9/16/95 12/31/95 Open Nabors 28E E-39 . .3638 : 3358'NS_L, 5_01'W_EL, Se_c 6~T1 ?~, RI~4E 2,250 Nabors 28E G-04A 3509 2917'NSL, 1974'WEL, Sec 12,T11N, R13E 5,937 Nabors 28E G-21 3509 2911'NSL. 2368'WEL. Sec 12,T11N, R14E 11,430 Nabors 28E S-24 2750 1633'SNL, 4228'WEL, Sec 35,T12N, R12E 20,261 Nabors 28E S-33 2958 1639'SNL, 1487'WEL, Sec 35.T12N. R12E 18,014 928 220 1,022 80 8/28/95 12/31/95 Open 1 ,~7_9_8_ .... 1_,82. 4 ...... 2,315 . 10/20/95 1 2/31/95 Open 3,956 3,072 4,270 70 62 9/8~95 12/'31/95 Open 11,773 2,177 5,751 '275 285 12/9/95 12/9/96 Open 6,613 2,431 8,392 270 308 12/1/95 12/1/96 Open 8,062 Nabors 28E S-41 3331 4152' NSL, 4504' WEL, Sec 35,T12N, 4,159 2,034 1,754 Nabors 28E S-42 3077 Sec 35, T12N, R12E 168 100 Nabors 2ES H-35 3157 4535'NSL, 1266'WEL, sec 21,T11N, R13E 4,860 3,725 555 480 20 80 10/26/95 12/31/95 Open 115 2/8/96 2/8/97 Open 68 3/13/96 3/13/97 Open - Nabors 2ES H-36 3550 4478'NSL, 1265'WEL, Sec 21,T11N, R13E 1,452 857 100 410 85 10/26/95 12/31/95 Open SCANNED NOV I i 2002 Page 3 : ~.~.,r~,t er".' hsr d orr. !ces r-illing TO: Blair Wondzell FROM: Chris West DATE: October 27, 1995 SUBJECT: MPB-24 Well Suspension APl # 50-029-22642 Blair; Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20- AAC 25.110. As discussed this morning we propose setting three plugs in this well as detailed in the attached form. This will allow us to retain the wellbore for potential future sidetrack or service well use. ' We would like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid wastes. There are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the rig. Thank you for your help in this matter. Please call me if I maY be of any assistance. Chris West Drilling Operations Engineer Nabors 27E (907)-564-5089 ... - ,,. ,--A,~.:,,,:,',:;=,~£~.;;[', :. STATE Of ALASKA ALAS~--~OIL AND GAS CONSERVATION COMMISSI,~': REPORT £_ :SUNDRY WELL OPE..ATIONS 1. Operations performed: Operation shutdown__ Stimulate__ Plugging__ Pull tubing__ Alter casing __ Repair well__ Perforate/~ Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora_~e, Alaska 99519-6612 4. Location of well at surface 3358' NLS, 501' WEL, SEC. 6, T11N, R14E At top of productive interval 358' NSL, 189' WEL, SEC. 6, T11N, R14E At effective depth 4282' NSL, 5170' EWL, SEC. 5, T11N, R14E At total depth 1050' NSL, 189' EWL, SEC. 5, T11N, R14E 5. Type of Well: Development ~' Exploratory __ Stratigraphic __ Service __ 6. Datum elevation (DF or KB) KB = ~¢, 05' 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number E-39 9. Permit number/approval number 95-126 / 10. APl number 50- 029-22587 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10931' feet Plugs (measured) 8944' feet 10842' feet Junk (measured) 8941' feet Casing Length Structural .- Conductor 107' Surface 3603' Intermediate 10030' Production .. Liner 9058' Perforation depth: Size Cemented 20" 260 sx Arctic Set 9-5/8" 1020 sx CS III, 306 sx 7" 96 sx Class 'G' 4-1/2" 140 sx Class 'G' measured 10170'-10330', 10400;10590', 10640'-10820' true vertica§ubsea 8907'-8915', 8917'-8919', 89824'-8940' Tubing (size, grade, and measured depthS-I~2" @ 9347' Packers and SSSV (type and measured depth~Packer @ 9291' SSSV @ 2187' 13. Stimulation or cement squeeze summan~See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Measured depth 143' 3639' 10066' 9995'- 10932' True vertical depth BKB 143' 3624' 8892' 8877'-8945' ORIGINAL 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 316 1914 8 190 52 Subsequent to operation 1408 4002 35 185 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run I Daily Report of Well Operations - I OilX Gas Suspended 17. I hereb, v, certi~y tyt the forgoing is true.,a~d76orrect to the best of my knowledge. Signed-/'"~'~~/.,,'.~ ~ ~/'?/t -/~'"~~.~_~(- Title TechnicalAssistantlll Form 10-404 R[e(/06/15/88 b '"'~ Service SUBMIT IN DUPLf'CAT'E E-39 DESCRIPTION OF WORK COMPLETED ADD PERFS 9/12/96 SUMMARY The following additional interval were perforated using 2.5" guns, 4 SPF, zero orientation and 0° phasing. 10110'- 10150' MD 10090' - 10110' MD 11/21/96 SUMMARY The following additional interval were perforated using 2.5" guns, 6 SPF, random orientation and 60° phasing. 10020' - 10040' MD P E RM IT DATA 95-126 7015 95-126 CN/DENS - ND 95-126 CN/DENS - TVD 95-126 EWR/GR - MD 95-126 EWR/GR - TVD 95-126 GR/CCL-PERF 95-126 PERF A ;3 G C C I n di' v i d u a 1 W e 1 't Geological Mater'ial s Inventor'y T DATA_PLUS ~/~WD SPERRY~S FM EVAL L SEPIA 2~ ~.- ~Cll~ ~//9950~10200 ~L/,IO020-.IO0~O Page: Date: R i 07/28/97 DATE_RECVD FINAL 02/07/96 0 '1/2~/96 01/2~/96 01/2~/96 01/2a/96 09/'18/96 01/0~/97 10--407 ~,~"ON P L E TION DATE DAILY WELL OPS R b~, 5-,¢-~-~ Ar'e dr'y ditch samples required? yes ~nd received? //'lc:,/q~ / Was the well cored? yes ~.. Analysis &. description received? Are wel '1 tests r'equi red? COMMENTS ~~.ecei vedo. ~¢~ ANNULAR INJECTION DATA ENTRY SCREEN , A s s e t .WO,~. ......................................... Rig Name .blabz3r. s..2J3J~ ........................... Inj Well Name .Er.3,9. ......................................... Permit Start ...... 8.:.2.J3.:.9.5 ..... Permit End....:t.2J..3..1.zg.~5... Sur Csg Dep .3.6.2,13. .............. · ............................................................. Curnulative Data Rig Completion Formation :: ntermittant i:: i: Fina Well Total MUd/Ct,(] :WaSh Fluids :FlUids;:: i:::'::~'i~ FreeZe FreeZe Legal Desc .3358.'.blSL,...5.0.1.:.W. EL..S.ec..6,.T..1..1~,...B.1..4.E ........................... R esea rc h ........................................................................................................................ CD. BBEC~ED..CC).P...¥..SEbJZ..T. C3..AOGCC.2:26:97 ....... oUrce Well E-39 E-39 iE-39 :E-39 E-39 'E-39 Daily Data ~ --',Mud, Ctgs, Om~ I ~ Intermittent, Final ' Annulu ' --s'-~ Dateof Contaminated/ RigWash cOmpletion Formation i Freeze t FreeZe Daily RatO Pressure :StatuS Injection Drlg Mud |. Fluids ~ Fluids I Fluids I Protection|:Protection ' To[al ~ ~ 09/30/95 250 10/01/95 478 10/02/95 10/03/95 10/04/95 10/05/95 200 10/07/95 Comments Complications 700 PSI - 1995 Summary. 700 PSI 750 PSI 700 PSI 700 PSI 750 PSI 800 PSI FREEZE PROTECTED ANNULUS W/80 BBLS DIESEL Surf Csg Dep 3 6 3 8 , , , ~ , ..... VOLUME {BBLS' Method ,of displosal=pump[n~ ~own outor annulus SOURCE WELL DATE OF DIESE~ FREEZE MUD/CTGS BRINE WA~R Daily Cum. Total COMPLICATIONS, COMMENTS NUMBER INJECTION PROT. E-39 9 / 3 0 / 9 5 2 5 0 ~?~?~ ~[~ ~ ~.700 PSI E-3O 1 0/4/~5 80.00 ::~ ~:: ~ ~ ~81 ~;~700 fi-aO ~ 0/5/05 200.00 ~25.00 ~::~ ~ ~:) ~S~I ~ 750 - ~:~?~; ?:~;',~' ANNULUS W/80 bbl DIESE~ , Page 1 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10663 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 1 2/23/96 Well Job # Log Description Date BL RF Sepia LIS Tape F -41 '~"~,~:~H 96367 CNL 961117 I 1 1 C-41 INFLATABLE BRIDGE PLUG 961123 I 1 ' D- 13 CHEMICAL CU'I-I'ER 961126 I 1 E-15A INJECTION PROFILE LOG 961122 1 1 E-39 PERFORATING RECORD 961121 I 1 F- 12 TUBING PUNCH ONE SHOT 96111 4 1 1 R-12 RST 961118 1 1 S-41 PRODUCTION PROFILE 961127 1 1 X- 17 PRODUCTION PROFILE W/DEFT 961130 1 1 X-36 CBL 961128 1 1 .. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received ~ State of Alaska Alaska Oil & Gas Conservation Comm. Atten: Howard Okland 3001 Porcupine Drive Anchorage, AK 99501 Transmittal of Final Prints. Please sign and return copy to: Western Aitas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 ~Weli Name Services Bluelines R/F Sepia ilE-39 GR/CCL PERF 1 1 0;: :;H-35 CCL SETTING SERVICE 1 1 O; M-30 GR/CCL PERF 1 1 CCL CUTTING SERVICE~ R-15 J-08 CN/GR/CCL 1 1 0 H-13 PLS 1 1 0 Date Contact Rebecca Lange or Jennifer Dietz if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. WELL LOG TRANSMITTAL To: State of Alaska February 3, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Larry Grant 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - E-39 AK-MW-50084 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 E-39: 1 LDWG formatted LIS tape with verification listing. API#: 50-029-22587-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company CI Fi I I--I-- I IM 13 WELL LOG TRANSMITTAL To: State of Alaska January 22, 1996 Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Dr. q~f ] ~-~Q3 Anchorage, Alaska 99501 ,-, , MWD Formation Evaluation Logs - E-39, AK-MM-950949 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 ~2~;'x 5" MD Resistivity and Gamma Ray Logs: 50-029-22587-00 1 Blueline 1 Rev Folded Sepia ~2" x 5" TVD Resistivity and Gamma Ray Logs: 50-029-22587-00 1 Blueline 1 Rev Folded Sepia 2"x 5" MD Neutron and Gamma Ray Logs: 50-029-22587-00 1 Blueline 1 Rev Folded Sepia  !' x 5" TVD Neutron and Gamma Ray Logs: 50-029-22587-00 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR FIECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] !2. Name of Operator 7. Permit Num,b,h:~r% BP Exploration 95-126 ~_ . , 3. Address B. APl Number / ~- P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22587 ' /"(:%~./?~'-'~ ,, .~. 4. Location of well at surface 9. Unit or Lease Name At Top Producing Interval ¢ ..¢.. , , .; 10. Well Number At Total Depth 1050' NSL, 189' EWL, SEC. 5, T11N, R14E ..... 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 66.05' ] ADL 028304 12. Date Spudded 13. Date T.D. Reached 14. Date Cornp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions 09/15/95 10/03/95 10/07/95I N/A feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 10931'MD/8944'TVD 10842'MD/8941'TVD YES [] ~ [] 2187feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, L WD, GR, DIR/FE, NEU, RES 23. CASING, LINER AND CEMENTING RECORD SE'R-lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO-Iq'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 107' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# NT80 35' 3639' 12-1/4" 1020 sx CS III, 306 sx 'G', 225 sx CS II 7" 26# L-80 33' 10066' 8-1/2" 96 sx Class 'G' 4-1/2" 12.6# L-80 9995' 10932' 6" 140 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 3-1/2" 9347' 9291' MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10170'- 10330' 8907'- 8915' Freeze Protect with 80 bbls Diesel 10400'- 10590' 8917'- 8919' 10640'- 10820' 8924'- 8940' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) October 16, 1995 Gas Lift Date of Test Hours Tested PRODUCTION FOR OlL-BBL GAS-MCF WATER-BBL CHOKE SlZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. , /3b'O Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 9286' 8390' Shublik 9332' 8433' Top of Sadlerochit 9411' 8503' -. 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title Seniqr Drilling Engineer Date ~' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the Iocatio.~ of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: E-39 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 09/15/95 10:30 SPUD: 09/15/95 11:30 RELEASE: OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 09/16/95 (1) TD: 360'( 360) 09/17/95 ( 2) TD: 2623' (2263) 09/18/95 (3) TD: 3650' (1027) 09/19/95 ( 4) TD: 3650'( 0) 09/20/95 (5) TD: 6255' (2605) 09/21/95 (6) TD: 7362' (1107) 09/22/95 ( 7) TD: 8695' (1333) DRILLING MW: 0.0 VIS: 0 MOVE AND ACCEPT RIG. WASHED T/107' TEST DIVERTER. BHA #1, CIRC AT 107'. FILL LINES AND CONDUCTOR CHECK FOR CEMENT. DRILLED T/360'. SPUD IN AT 23:30 HOURS 09/15/95. POOH T/1260' MW: 0.0 VIS: 0 BHA #1. DRILLED T/980'. CBU. DRILLED T/2623'. CBU. POOH T/1260'. AT TOP OF CHECK TRIP INTERVAL. INVESTIGATED PRESSURE CHANGE MW: 0.0 VIS: 0 BHA #1, RIH T/2623'. DRILLED T/3650', REACHED PLANNED END OF RUN, SECTION TD. CBU. POOH T/1260', AT TOP OF CHECK TRIP INTERVAL, STRAPPED OUT NO CORRECTION. RIH T/3650', NO FILL, NO DRAG ON SHORT TRIP. CBU. POOH T/380'. PULLED AND LAID OUT BHA. RIGGED UP CASING HANDLING EQUIPMENT. RAN CASING T/3638'. MIXED AND PUMPED CEMENT SLURRY. RELEASED TOP PLUG, PLUG BUMPED. INVESTIGATED PRESSURE CHANGE. HAD LEAK IN CEMENT STAND PIPE WHEN WE BUMPED THE PLUG WITH 2000 PSI. BLOCK OFF STAND PIPE AND CHECK FLOATS. FLOATS HELD. DRILLED CEMENT T/3630' MW: 0.0 VIS: 0 MIXED AND PUMPED CEMENT SLURRY. LEAD CEMENT PUMPED. ND DIVERTER. NU BOP STACK. TEST WELL CONTROL EQUIPMENT. BHA #2, RIH T/3554', CBU. TESTED CASING. DRILLED CEMENT T/3630' DRILLED T/6255' MW: 0.0 VIS: 0 BHA #2, DRILLED CEMENT T/3638', AT 9-5/8" CASING SHOE. DRILLED T/3660', CBU. DRILLED T/4827', STARTED SCHEDULED WIPER TRIP, DUE TO FOOTAGE DRILLED. POOH T/3638', AT 9-5/8" CASING SHOE. RIH T/6255' DRILLED T/7362' MW: 0.0 VIS: 0 BHA #2, DRILLED T/6511' BIT QUIT. CIRC AT 6511'. HOLE SWEPT WITH SLUG. POOH T2280'. BHA STOOD BACK. BHA #3, CHANGE BIT AND ORIENTE MOTOR, CHANGEOUT JARS, TEST MWD AND MOTOR. RIH T/3638', AT 7-5/8" CASING SHOE. RIH T/6511', ON BOTTOM. DRILLED T/6649'. PRESSURE CHANGED, DOWNHOLE WASHOUT. POOH T/6350'. FOUND WASHOUT IN SLIP AREA OF JT #10. RIH T/6649', ON BOTTOM. DRILLED T/7362' DRILLING MW: 0.0 VIS: 0 RUN BHA #3. DRILL T/7932'. START SCHEDULED WIPER TRIP. POOH T/6494'. AT TOP OF NEW HOLE SECTION. DRILLED T/8695' WELL ' E-39 OPERATION: RIG : NABORS 28E PAGE: 2 09/23/95 ( 8) TD: 9140' ( 445) 09/24/95 ( 9) TD: 9541' ( 401) 09/25/95 (10) TD: 9700' ( 159) 09/26/95 (11) TD: 9700' ( 0) 09/27/95 (12) TD: 9840' ( 140) 09/28/95 (13) TD: 9975' ( 135) 09/29/95 (14) TD:10085' ( 110) DRILLED T/9140' MW: 0.0 VIS: 0 BHA %3, DRILLED T/8915', CBU. POOH T/1081'. BHA STOOD BACK. BHA %4, P/U GAMMA RAY PROBE, ORIENT RIH T/8915' ON · , BOTTOM. HOLE IN GOOD CONDITION. DRILLED T/9140' CBU AT 9541· MW: 0.0 VIS: 0 BHA #4, DRILLED T/9215'. WALK AND BUILD RATE UNACCEPTABLE. CBU AT 9215'. POOH T/216'. BHA PULLED AND STOOD BACK. BHA #5, RIH T/9145', AT DOGLEG. WASHED TO BOTTOM AT 9215'. DRILLED T/9541'. REACHED PLANNED END OF RUN, DIRECTIONAL OBJECTIVE MET. PICK UP ROTARY ASSEMBLY THROUGH ZONE 3. CBU AT 9541' BHA #7, RIH T/1250' MW: 0.0 VIS: 0 BHA #5, POOH T/209'. PULLED AND STOOD BACK BHA. TEST BOP STACK, WITNESS WAIVED BY BOBBY FOSTER, AOGCC. BHA #6, P/U ROTARY ASSEMBLY TO DRILL ZONE 3. RIH T/9465'. STOPPPED TO CORRELATE DEPTH. MAD PASS 9465' TO 9541', GAMMA RAY MARKER. DRILLED T/9700', REACHED PLANNED END OF RUN, GEOLOGICAL. CBU, POOH T/188' PULL BHA AND STAND BACK. BHA #7, RIH T/1250' RIH T/9630' TOP OF FISH MW: 0.0 VIS: 0 · BHA #7, RIH T/9370', TOP OF NEW HOLE SECTION. LOGGED HOLE WITH LWD: DIR/FE. MAD PASS 9370' TO 9450'. PRESSURE CHANGED, DOWNHOLE WASHOUT. POOH T/395'. PULLED BHA. BHA #8, RIH T/9418', TOP OF FISH. FISHED AT 9662', WORK OVER FISH, PUSH FISH FROM 9418' TO 9662'. LATCHED FISH AND POOH T/290'. DID NOT RECOVER FISH, GRAPPLE BROKE. BHA #9, RIH T/9630', TOP OF FISH. DRILLED T/9840' MW: 0.0 VIS: 0 BHA #9, FISHED AT 9588'. REAM FROM 9530· TO 9588', TOP OF FISH. LATCH FISH, FISH STUCK, JAR LOOSE. FISH CAME FREE. POOH T/270'. L/D FISH. BHA #10, RIH T/9550', TOP OF FILL. WASHED T/9700', BRIDGE AT 9620·. DRILLED T/9840'. SLIDING BUILDING ANGLE. DRILLED T/9975' MW: 0.0 VIS: 0 BHA #10, DRILLED T/9895'. BUILD RATE UNACCEPTABLE. CBU, POOH T/380', HOLE IN GOOD CONDITION. BHA STOOD BACK. BHA #11, RIH T/9430', TOP OF NEW HOLE SECTION. LOGGED HOLE WITH LWD. TOP OF FILL AT 9693'. DRILLED T/9975'. L/D DP T/9900' MW: 0.0 VIS: 0 BHA #11. DRILLED T/10085', REACHED PLANNED END OF RUN. CBU, POOH T/214' BHA PULLED AND LAID OUT. BHA %12, RIH T/9205', AT DOGLEG. REAMED T/10085'. CBU, L/D DP T/9900' WELL : E-39 OPERATION: RIG : NABORS 28E PAGE: 3 09/30/95 (15) TD:10085' ( 0) 10/01/95 (16) TD:10085' ( 0) 10/02/95 (17) TD:10335' ( 250) 10/03/95 (18) TD:10680' ( 345) 10/04/95 (19) TD:10931 PB: 0 10/05/95 (20) TD:10931 PB: 0 RUN CASING MW: 0.0 VIS: 0 RUN BHA #12. LD DP T/7500'. SERVICE DRILLSTRING HANDLING EQUIP, REPAIR IRON ROUGHNECK. LD DP T/240' PULLED BHA. SERVICED TOP RAM, CHANGE TO 7". RUN 7" CASING T/3600'. RAN CASING T/9695'. SERVICE CASING HANDLING EQUIP, CHANGE OUT ELEVATORS. RUN CASING T/9765', WASHING CASING TO BOTTOM. RUN DP T/9989' MW: 0.0 VIS: 0 RUN 7" CASING T/9765'. WASH CASING F/9765' T/10067'. HANGER LANDED. CBU @ 10067'. MIXED & PUMPED SLURRY. TEST WELL CONTROL EQUIP. INSTALL CASING HANGER. LD LANDING JT. INSTALL PACKOFF & TEST. RU ALL RAMS & CHANGE OUT. CHANGE OUT KELLY. TEST BOP STACK, RAMS, LINES, VALVES & HYDRIL. OK. INSTALL WB. RUN BHA #13. RUN 3-1/2" DP T/9989', @ 7" CASING SHOE & TOP OF FLOAT COLLAR. DRILLING MW: 0.0 VIS: 0 RUN 3-1/2" DP. CBU @ 9989'. RUN BHA #13. DRILLED T/10095' CBU @ 10095'. DRILLED T/10150'. POOH T/203'. PULLED BHA. RUN BHA #14. CHANGE BITS, ORIENT MWD. RIH T/10066' @ 7" CASING SHOE. REAMED T/10150' @ BOTOOM IN CASE OF UNDER GAUGE HOLE. DRILLED T/10335'. DRILLING MW: 0.0 VIS: 0 RUN BHA #14. DRILLED T/10615'. MAX HOURS ON BIT, REACHED PLANNED END OF RUN. CBU @ 10615'. POOH T/425'. HOLE OK. RUN BHA #15, CHANGE BITS, ORIENT MWD. RIH T/10615', ON BOTTOM. DRILLED T/10680' POOH MW: 0.0 RUN BHA #15. DRILLED T/10899'. CBU @ 10899' DRILLED T/10931'. CBU @ 10931'. POOH T/425', @ BHA. PULLED BHA. SERVICE WR. RUN BHA ~16. PICK HOLE OPENER. RIH T/10068', @ 7" CASING SHOE. REAM T/10931', ON BOTTOM. CBU @ 10931' POOH T/10066', TO RUN 4-1/2" LINER. RIH MW: 0.0 RUN BHA #16. POOH T/200'. PULLED BHA. RUN 4-1/2" CASING T/940', @ WELLHEAD. RAN DP T/10931'. CBU @ 10931'. CEMENT CASING. PLUG BUMPED. CIP @ 2045 HRS. TEST CASING. REV CIRC @ 9995'. PULL 3-1/2" DP. HANGER ASSY LAYED OUT. RUN BHA ~17. SERVICE DRILLSTRING HANDLING EQUIP, LINE SLIPPED & CUT. RIH T/9900' WELL : E-39 OPERATION: RIG · NABORS 28E PAGE: 4 '10/06/95 ( 21) TD:10931 PB: 0 10/07/95 (22) TD:10931 PB: 0 10/08/95 (23) TD:10931 PB: 0 LD DRILLPIPE MW: 0.0 RUN BHA #17. RIH T/10842', @ FLOAT COLLAR. WASH F/10755' T/10842' @ LANDING COLLAR. CBU @ 10842'. TEST CASING VIA ANNULUS & STRING. OK. CBU. TEST CASING. REVERSE CIRC @ 10842'. POOH T/210', @ BHA. PULLED BHA. RUN BHA #18. RI T/8636'. TEST TUBING CONVEYED PERF GUN VIA ANNULUS & STRING. OK. RIH T/10842', ON BOTTOM. SET RETRIEVABLE PACKER @ 9862'. RU TEST CHOKE MANIFOLD. FUNCTIONED DOWNHOLE TOOLS @ 10170'. FIRED GUNS. REVERSE CIRC @ 9862'. REST HOLE @ 10824'. LD DP T/5000' RD BOP STACK MW: 0.0 RUN BHA #18. LD DP T/9100'. PULLED BHA. LD PERF GUNS, ALL SHOTS FIRED. REMOVE WELLHEAD BORE PROTECTOR. RUN 3-1/2" TUBING T/7300'. SCSSSV NIPPLE ASSY INSTALLED. TEST DUAL CONTROL LINE. RUN TUBING T/9346' TO LANDING STRING. HANGER LANDED. CBU @ 9346' SET PACKER @ 9291' LD TUBING T/35'. LD LANDING JT. RD BOP STACK. RELEASED @ 1800 HRS,10/07 MW: 0.0 RIN 3-1/2" SINGLE COMPLETION. RD BOP STACK. INSTALL ADAPTOR SPOOL. TEST DUAL CONTROL LINE. PRESSURE TEST TREE. INSTALL BOP TEST PLUG ASSY. CBU @ 3000'. INSTALL HANGER PLUG. CBU @ 3000'. FREEZE PROTECT ANNULUS. RD DRILLFLOOR/DERRICK TO MOVE RIG. RIG RELEASED @ 1800 HRS., 10/07/95. SIGNATURE: (drilling superintendent) DATE: ~_qY-SUN DRILLING SERVICES ANCHORAGE ALASKA SHARED SERVICES DRILLING PBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DIRECTION RECTANGULAR COORD DEGREES DG/100 NORTH/SOUTH EAST DATE OF SURVEY: ~Q0495 MWD SURVEY / KELLY BUSHING ELEV. OPERATOR: BP EXPLORATI DLS TOTAL INATES / EST FT. VERT. SECT. 0 .00 -66.05 216 216.20 150.15 304 304.45 238.40 395 395.32 329.27 485 485.56 419.51 0 0 N .00 E .00 .00N .00E 0 18 S 3.40 W .14 .57S .03W 0 12 S 30.30 E .20 .93S .03E 0 42 S 46.10 E .56 1.45S .51E 1 30 S 59.00 E .92 2.44S 1.92E .00 .53 .90 1.54 2.88 574 574.85 508.80 664 663.84 597.79 752 751.64 685.59 841 840.68 774.63 931 929.83 863.78 1021 1018.79 952.74 1115 1111.77 1045.72 1210 1206.41 1140.36 1306 1301.06 1235.01 1401 1395.40 1329.35 2 42 S 65.20 E 1.36 3.93S 4.83E 4 11 S 69.40 E 1.71 5.96S 9.80E 5 18 S 60.80 E 1.48 9.08S 16.37E 6 24 S 65.50 E 1.34 13.16S 24.52E 7 11 S 65.70 E .89 17.55S 34.20E 7 54 S 66.70 E .79 22.31S 44.99E 8 23 S 70.50 E .78 27.15S 57.38E 8 0 S 73.10 E .57 31.42S 70.33E 7 54 S 73.00 E .11 35.27S 82.98E 7 11 S 70.80 E .80 39.14S 94.86E 5.11 8.44 13.27 19.46 26.36 33.93 42.02 49.72 56.93 63.96 1496 1489.77 1423.72 1591 1584.32 1518.27 1687 1679.89 1613.84 1784 1777.06 1711.01 1877 1869.46 1803.41 5 54 S 72.20 E 1.38 42.59S 105.13E 4 35 S 73.00 E 1.37 45.20S 113.42E 3 42 S 73.70 E .94 47.19S 120.06E 3 30 S 67.30 E .46 49.22S 125.82E 3 5 S 68.70 E .44 51.22S 130.76E 70.12 74.93 78.69 82.24 85.53 1972 1965.03 1898.98 2066 2058.51 1992.46 2162 2154.34 2088.29 2258 2250.63 2184.58 2352 2344.29 2278.24 2 42 S 67.00 E .43 53.04S 135.24E 1 17 S 44.10 E 1.69 54.66S 138.01E 0 18 S 61.00 W 1.47 55.56S 138.55E 0 24 N 77.00 W .28 55.61S 138.00E 0 12 N 66.40 W .22 55.47S 137.53E 88.52 90.85 91.87 91.76 91.50 2447 2439.50 2373.45 2544 2536.30 2470.25 2638 2630.86 2564.81 2734 2726.80 2660.75 2830 2822.07 2756.02 0 18 N 73.70 W .11 0 18 N 71.40 W .00 0 24 N 80.20 W .12 0 36 N 85.30 W .21 1 30 S 1.20 W 1.73 55.33S 137.14E 91.26 55.18S 136.66E 90.97 55.05S 136.10E 90.69 54.95S 135.27E 90.36 56.15S 134.74E 91.38 2924 2915.96 2849.91 3016 3007.79 2941.74 3110 3102.19 3036.14 3206 3197.79 3131.74 3301 3292.05 3226.00 4 30 S .70 W 3.19 4 35 S .30 W .11 4 18 S 2.40 W .36 5 5 S 1.80 W .84 6 11 S 3.90 E 1.30 Date~. 61.07S 134.67E 96.08 68.38S 134.61E 103.09 75.73S 134.44E 110.09 83.58S 134.16E 117.56 92.89S 134.37E 126.57 SP. .¢Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 DATE OF SURVEY: 100495 MWD SURVEY JOB NUMBER: AK-MM-950949 KELLY BUSHING ELEV. = 66.05 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORD DEGREES DG/100 NORTH/SOUTH EAST INATES VERT. /WEST SECT. 3396 3386.54 3320.49 3491 3479.73 3413.68 3568 3555.01 3488.96 3710 3692.81 3626.76 3805 3784.38 3718.33 8 0 11 18 12 53 14 48 17 12 S 5.80 W 2.26 104.61S 134 S 11.60 W 3.63 120.24S 131 S 11.20 W 2.08 136.06S 128 S 14.00 W 1.42 169.19S 120 S 13.60 W 2.52 194.69S 114 .05E 137.74 .52E 152.04 .34E 166.36 .87E 196.11 .62E 218.87 3900 3873.52 3807.47 3995 3961.25 3895.20 4090 4048.18 3982.13 4184 4132.73 4066.68 4277 4215.13 4149.08 21 36 23 23 24 53 26 47 28 23 S 15.50 W 4.70 225.06S 106 S 18.30 W 2.21 259.81S 96 S 17.40 W 1.62 296.91S 84 S 13.50 W 2.71 336.38S 73 S 12.80 W 1.76 378.33S 63 .68E 245.84 .08E 276.27 .14E 308.60 .28E 343.50 .49E 381.08 4372 4298.13 4232.08 4467 4378.35 4312.30 4560 4455.08 4389.03 4656 4532.52 4466.47 4751 4609.46 4543.41 30 47 33 35 35 47 35 47 35 54 S 10.90 W 2.70 424.48S 53 S 11.20 W 2.96 474.06S 44 S 12.80 W 2.55 526.02S 33 S 13.90 W .67 580.36S 20 S 12.10 W 1.12 634.52S 7 .84E 422.73 .15E 467.66 .09E 514.50 .19E 563.12 .69E 611.68 4846 4686.35 4620.30 4942 4764.30 4698.25 5035 4839.64 4773.59 5130 4916.83 4850.78 5227 4995.41 4929.36 35 47 36 0 35 42 35 47 35 24 S 12.00 W .12 688.85S 3 S 12.10 W .22 744.04S 15 S 13.40 W .88 797.12S 27 S 16.20 W 1.72 850.84S 41 S 13.60 W 1.62 905.19S 56 .91W 660.65 .69W 710.39 .70W 758.05 .90W 805.71 .36W 853.90 5321 5071.94 5005.90 35 35 5417 5150.40 5084.35 35 24 5511 5226.57 5160.52 35 35 5607 5305.04 5238.99 35 47 5702 5382.40 5316.35 35 30 S 12.20 W .89 958.40S 68 S 12.70 W .37 1013.04S 80 S 12.00 W .48 1066.12S 92 S 13.10 W .70 1121.15S 104 S 13.40 W .36 1175.16S 117 .55W 901.63 .61W 950.77 .23W 998.52 .48W 1047.99 .20W 1096.34 5798 5460.29 5394.24 5893 5536.86 5470.81 5988 5611.88 5545.83 6085 5687.74 5621.69 6178 5761.35 5695.30 35 47 37 12 38 12 38 5- 37 42 S 14.60 W .79 1229.36S 130 S 12.10 W 2.14 1284.49S 143 S 12.50 W 1.09 1341.13S 156 S 10.90 W 1.03 1399.48S 168 S 10.70 W .45 1455.77S 178 .72W 1144.65 .78W 1193.98 .13W 1244.96 .22W 1297.66 .95W 1348.74 6274 5837.31 5771.26 6369 5912.34 5846.29 6438 5966.67 5900.62 6525 6036.78 5970.73 6620 6114.34 6048.29 38 0 37 24 37 30 35 24 35 47 S 9.70 W .71 1513.86S 189 S 8.20 W 1.16 1571.14S 198 S 9.50 W 1.16 1612.26S 204 S 10.20 W 2.46 1663.27S 213 S 10.20 W .42 1717.92S 223 .40W 1401.64 .43W 1454.16 .83W 1491.88 .68W 1538.43 .52W 1588.20 SPa _<Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 DATE OF SURVEY: 100495 MWD SURVEY JOB NUMBER: AK-MM-950949 KELLY BUSHING ELEV. = 66.05 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6715 6191.20 6125.15 6808 6266.54 6200.49 6904 6345.47 6279.42 7000 6425.30 6359.25 7096 6505.75 6439.70 36 24 S 9.80 W .68 1773.12S 233.25W 35 30 S 11.60 W 1.49 1826.80S 243.38W 33 35 S 14.60 W 2.66 1879.73S 255.66W 33 12 S 15.50 W .67 1930.56S 269.33W 33 17 S 17.40 W 1.09 1981.14S 284.26W 1638.52 1687.27 1734.70 1779.74 1824.18 7190 6584.22 6518.17 7285 6662.49 6596.44 7382 6741.26 6675.21 7477 6818.27 6752.22 7571 6894.97 6828.92 34 5 S 16.30 W 1.07 2031.22S 299.43W 35 12 S 17.90 W 1.50 2082.92S 315.34W 35 12 S 19.20 W .78 2135.59S 333.02W 36 0 S 18.30 W 1.01 2187.80S 350.73W 35 54 S 16.70 W 1.00 2240.85S 367.46W 1868.08 1913.32 1959.01 2004.24 2050.55 7666 6971.64 6905.59 7761 7048.21 6982.16 7857 7125.40 7059.35 7952 7200.70 7134.65 8046 7276.59 7210.54 36 5 S 14.10 W 1.63 2294.54S 382.25W 36 30 S 13.30 W .65 2349.18S 395.56W 36 54 S 10.40 W 1.85 2405.48S 407.37W 37 0 S 10.70 W .22 2461.16S 417.74W 36 35 S 12.80 W 1.39 2516.73S 429.30W 2098.01 2146.81 2197.61 2248.22 2298.39 8142 7353.58 7287.53 8237 7430.48 7364.43 8333 7509.32 7443.27 8429 7589.87 7523.82 8523 7671.00 7604.95 36 35 S 13.20 W .25 2572.44S 442.16W 35 0 S 12.50 W 1.74 2626.52S 454.50W 33 47 S 14.80 W 1.85 2678.97S 467.22W 32 17 S 18.60 W 2.66 2729.15S 482.24W 28 53 S 17.80 W 3.63 2774.72S 497.24W 2348.33 2396.85 2443.71 2487.74 2527.35 8619 7756.32 7690.27 8714 7842.44 7776.39 8809 7929.91 7863.86 8913 8026.52 7960.47 9003 8112.25 8046.20 25 36 S 18.80 W 3.47 2816.44S 511.01W 23 36 S 19.20 W 2.12 2853.73S 523.85W 22 47 S 16.70 W 1.33 2889.38S 535.41W 20 36 S 15.40 W 2.17 2926.32S 546.06W 15 6 S 9.40 W 6.43 2953.20S 552.19W 2563.60 2595.86 2626.89 2659.42 2683.53 9035 8143.63 8077.58 9066 8173.57 8107.52 9098 8205.93 8139.88 9130 8237.53 8171.48 9145 8252.13 8186.08 11 41 S 4.70 W 11.05 2960.61S 553.14W 8 41 S 1.10 E 10.41 2965.98S 553.35W 7 48 S 10.80 E 5.06 2970.64S 552.89W 7 48 S 24.20 E 5.69 2974.74S 551.60W 8 6 S 29.00 E 4.94 2976.56S 550.68W 2690.39 2695.49 2700.09 2704.39 2706.39 9162 8269.00 8202.96 9195 8301.96 8235.91 9225 8331.31 8265.26 9257 8362.35 8296.30 9289 8393.23 8327.18 8 30 S 36.80 E 7.00 2978.62S 549.35W 9 36 S 45.10 E 5.11 2982.56S 545.90W 11 6 S 56.60 E 8.53 2985.89S 541.74W 13 53 S 73.30 E 14.30 2988.68S 535.52W 18 0 S 76.80 E 13.11 2990.92S 526.99W 2708.74 2713.48 2717.85 2722.25 2726.77 SPL ..Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING DBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 DATE OF SURVEY: 100495 MWD SURVEY JOB NUMBER: AK-MM-950949 KELLY BUSHING ELEV. = 66.05 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9320 8422.29 8356.24 9352 8451.39 8385.34 9385 8480.19 8414.14 9415 8506.69 8440.64 9447 8533.82 8467.77 22 30 26 42 29 23 30 42 32 0 S 75.80 E 14.57 2993.47S 516.58W S 76.00 E 13.12 2996.71S 503.66W S 82.90 E 12.92 2999.48S 488.59W N 88.20 E 15.16 3000.16S 473.32W N 80.00 E 14.04 2998.44S 456.93W 2732.11 2738.82 2745.66 2750.56 2753.46 9480 8561.24 8495.19 9515 8589.24 8523.19 9545 8613.13 8547.08 9576 8636.02 8569.97 9608 8660.22 8594.17 34 35 38 5 40 12 40 42 41 0 N 71.90 E 15.69 2994.04S 439.50W N 65.70 E 14.59 2986.56S 420.34W N 62.30 E 9.75 2978.02S 402.87W N 61.50 E 2.40 2968.83S 385.66W N 60.50 E 2.25 2958.68S 367.36W 2754.07 2752.21 2748.86 2744.81 2740.15 9640 8684.80 8618.75 9661 8700.29 8634.24 9696 8726.54 8660.49 9727 8748.53 8682.48 9759 8769.54 8703.49 41 24 41 47 43 0 46 20 50 31 N 60.00 E 1.59 2948.01S 348.68W N 60.20 E 2.03 2941.15S 336.75W N 61.10 E 3.81 2929.40S 315.85W N 61.60 E 10.83 2918.98S 296.77W N 60.20 E 13.61 2907.46S 276.09W 2735.09 2731.81 2726.33 2721.62 2716.30 9791 8788.76 8722.71 9823 8806.25 8740.20 9832 8811.28 8745.23 9850 8820.45 8754.40 9882 8836.01 8769.96 54 46 58 42 59 0 59 23 61 46 N 59.80 E 13.48 2894.86S 254.28W N 58.40 E 12.82 2881.16S 231.40W N 59.10 E 6.89 2876.84S 224.28W N 58.23 E 4.71 2868.84S 211.15W N 58.59 E 7.58 2854.39S 187.65W 2710.26 2703.45 2701.28 2697.25 2689.89 9914 8850.23 8784.18 9945 8862.41 8796.36 9977 8872.33 8806.28 10008 8879.99 8813.94 10075 8893.74 8827.69 65 2 69 24 74 18 77 19 78 47 N 60.00 E 11.03 2839.89S 163.21W N 61.67 E 14.73 2825.76S 137.89W N 62.02 E 15.38 2811.48S lll.20W N 61.88 E 9.69 2797.22S 84.43W N 60.68 E 2.82 2765.99S 27.44W 2682.75 2676.21 2669.91 2663.65 2649.48 10108 8899.41 8833.36 81 24 10139 8903.96 8837.91 81 56 10172 8907.59 8841.54 85 10 10203 8909.31 8843.26 88 36 10235 8910.11 8844.06 88 29 N 62.03 E 8.88 2750.41S 1.08E N 63.43 E 4.73 2736.17S 28.71E N 61.89 E 11.08 2721.40S 57.26E N 60.57 E 11.61 2706.20S 84.95E N 59.15 E 4.50 2690.31S 112.31E 2642.44 2636.43 2630.18 2623.27 2615.61 10267 8911.27 8845.22 10299 8913.05 8847.00 10331 8915.28 8849.23 10363 8916.84 8850.79 10394 8916.98 8850.93 87 22 86 8 85 55 88 33 90 57 N 61.42 E 7.85 2674.38S 140.23E N 58.39 E 10.38 2658.62S 167.43E N 58.00 E 1.38 2641.64S 194.81E N 59.70 E 9.67 2624.92S 222.48E N 62.48 E 11.77 2609.80S 249.85E 2608.06 2600.47 2591.77 2583.39 2576.47 SPk .Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 DATE OF SURVEY: 100495 MWD SURVEY JOB NIJMBER: AK-MM-950949 KELLY BUSHING ELEV. = 66.05 OPER3tTOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORD DEGREES DG/100 NORTH/SOUTH EAST INATES VERT. /WEST SECT· 10427 8916.02 8849.97 92 28 N 62.01 E 4.93 2594.88S 278 10458 8915.08 8849.03 90 55 N 59.03 E 10.55 2579.25S 305 10490 8915.13 8849.08 88 53 N 61.68 E 10.50 2563.50S 333 10522 8915.86 8849.81 88 29 N 60.19 E 4.79 2547.88S 361 10531 8916.10 8850.05 88 31 N 60.69 E 5.45 2543.34S 369 .20E 2570.02 · 84E 2562.69 .52E 2555.24 · 64E 2548.04 · 63E 2545.91 10552 8916.76 8850.71 87 43 N 59.95 E 5.44 2533.43S 387 10584 8918.80 8852.75 85 0 N 53.52 E 21.72 2515.88S 413 10615 8921.66 8855.61 84 28 N 54.92 E 4.78 2497.73S 438 10647 8924.72 8858.67 84 28 N 53.18 E 5.46 2479.19S 464 10679 8927.91 8861.86 84 22 N 53.38 E .66 2459.61S 490 .02E 2541.22 .77E 2531.80 .96E 2521.36 .52E 2510.65 .78E 2499.13 10711 8931.03 8864.98 84 15 N 53.70 E 1.08 2440.99S 515 10740 8933.70 8867.65 85 5 N 50.95 E 9.94 2423.48S 538 10772 8936.46 8870.42 84 58 N 51.35 E 1.30 2403.54S 563 10804 8939.06 8873.01 85 49 N 52.75 E 5.06 2383.69S 588 10835 8941.01 8874.96 87 2 N 52.06 E 4.44 2364.60S 613 .97E 2488.25 .65E 2477.72 .41E 2465.45 .86E 2453.45 .65E 2442.00 10868 8942.34 8876.29 88 18 N 53.74 E 6.42 2344.89S 10931 8944.19 8878.14 88 18 N 53.74 E .00 2307.96S 639.71E 2430.31 690.06E 2408.82 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 2408.91 FEET AT SOUTH 16 DEG. 38 MIN. EAST AT MD = 10931 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 163.87 DEG. SPL .Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 DATE OF SURVEY: 100495 JOB NUMBER: AK-MM-950949 KELLY BUSHING ELEV. = 66.05 FT. OPERATOR: BP EXPLOP~ATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -66.05 .00 N .00 E .00 1000 997.75 931.70 21.15 S 42.31 E 2.25 2000 1992.09 1926.04 53.54 S 136.42 E 7.91 3000 2991.64 2925.59 67.08 S 134.62 E 8.36 4000 3965.81 3899.76 261.68 S 95.46 E 34.19 2.25 5.66 .46 25.83 5000 4810.95 4744.90 777.08 S 22.93 W 189.05 6000 5620.69 5554.64 1347.91 S 157.63 W 379.31 7000 6425.11 6359.06 1930.44 S 269.29 W 574.89 8000 7239.01 7172.96 2489.52 S 423.11 W 760.99 9000 8108.94 8042.89 2952.31 S 552.04 W 891.06 154.86 190.26 195.58 186.10 130.08 10000 8877.99 8811.94 2801.28 S 92.04 W 1122.01 10931 8944.19 8878.14 2307.96 S 690.06 E 1986.81 230.95 864.79 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. .Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 DATE OF SURVEY: 100495 JOB NUMBER: AK-MM-950949 KELLY BUSHING ELEV. = 66.05 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -66.05 .00 N .00 E .00 66 66.05 .00 .00 N .00 E .00 166 166.05 100.00 .30 S .02 W .00 266 266.05 200.00 .81 S .04 W .00 366 366.05 300.00 1.20 S .25 E .00 .00 .00 .00 .00 466 466.05 400.00 2.18 S 1.48 E .02 566 566.05 500.00 3.75 S 4.46 E .08 666 666.05 600.00 6.01 S 9.95 E .27 766 766.05 700.00 9.73 S 17.53 E .63 867 866.05 800.00 14.34 S 27.11 E 1.19 .01 .06 .19 .36 .57 968 966.05 900.00 19.44 S 38.39 E 1.96 1068 1066.05 1000.00 24.87 S 51.07 E 2.91 1170 1166.05 1100.00 29.75 S 64.90 E 3.98 1271 1266.05 1200.00 33.85 S 78.33 E 4.96 1371 1366.05 1300.00 37.92 S 91.36 E 5.89 .76 .95 1.07 .98 .93 1472 1466.05 1400.00 41.84 S 102.80 E 6.62 1573 1566.05 1500.00 44.77 S 112.02 E 7.09 1673 1666.05 1600.00 46.94 S 119.20 E 7.38 1773 1766.05 1700.00 48.96 S 125.20 E 7.58 1873 1866.05 1800.00 51.15 S 130.59 E 7.75 .73 .47 .28 .20 .17 1973 1966.05 1900.00 53.06 S 135.29 E 7.88 2073 2066.05 2000.00 54.78 S 138.13 E 7.94 2174 2166.05 2100.00 55.59 S 138.49 E 7.95 2274 2266.05 2200.00 55.58 S 137.89 E 7.96 2374 2366.05 2300.00 55.44 S 137.46 E 7.96 .13 .06 .01 .00 .00 2474 2466.05 2400.00 55.29 S 137.01 E 7.96 2574 2566.05 2500.00 55.13 S 136.51 E 7.96 2674 2666.05 2600.00 55.00 S 135.86 E 7.96 2774 2766.05 2700.00 54.91 S 134.86 E 7.97 2874 2866.05 2800.00 57.87 S 134.71 E 8.02 .00 .00 .00 .01 .05 2974 2966.05 2900.00 65.03 S 134.63 E 8.28 3074 3066.05 3000.00 73.01 S 134.55 E 8.60 3174 3166.05 3100.00 80.75 S 134.24 E 8.90 3275 3266.05 3200.00 90.07 S 134.18 E 9.34 3376 3366.05 3300.00 101.75 S 134.34 E 10.03 .26 .32 .30 .44 .69 SP~ .Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 DATE OF SURVEY: 100495 JOB NUMBER: AK-MM-950949 KELLY BUSHING ELEV. = 66.05 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3477 3466.05 3400.00 3579 3566.05 3500.00 3682 3666.05 3600.00 3786 3766.05 3700.00 3892 3866.05 3800.00 117.63 S 132.04 E 138.54 S 127.85 E 162.33 S 122.58 E 189.18 S 115.95 E 222.28 S 107.44 E 11.32 1.29 13.58 2.26 16.53 2.94 20.30 3.77 26.00 5.71 4000 3966.05 3900.00 4110 4066.05 4000.00 4221 4166.05 4100.00 4335 4266.05 4200.00 4452 4366.05 4300.00 261.78 S 95.43 E 304.83 S 81.66 E 352.78 S 69.35 E 406.09 S 57.50 E 466.14 S 45.72 E 34.21 8.21 43.96 9.75 55.56 11.60 69.52 13.95 86.77 17.25 4574 4466.05 4400.00 4697 4566.05 4500.00 4821 4666.05 4600.00 4944 4766.05 4700.00 5067 4866.05 4800.00 533.73 S 31.33 E 603.83 S 14.38 E 674.53 S .87 W 745.28 S 15.96 W 815.59 S 32.10 W 108.36 21.59 131.65 23.29 155.07 23.42 178.49 23.42 201.80 23.31 5191 4966.05 4900.00 5313 5066.05 5000.00 5436 5166.05 5100.00 5559 5266.05 5200.00 5682 5366.05 5300.00 884.91 S 51.46 W 954.27 S 67.66 W 1023.89 S 83.06 W 1093.76 S 98.12 W 1163.82 S 114.50 W 225.01 23.21 247.79 22.78 270.61 22.82 293.53 22.92 316.72 23.19 5805 5466.05 5400.00 5930 5566.05 5500.00 6057 5666.05 5600.00 6184 5766.05 5700.00 6311 5866.05 5800.00 1233.39 S 131.77 W 339.76 23.04 1306.15 S 148.42 W 364.56 24.81 1382.78 S 165.00 W 391.64 27.08 1459.34 S 179.63 W 418.43 26.79 1535.99 S 193.19 W 445.16 26.73 6437 5966.05 5900.00 6561 6066.05 6000.00 6684 6166.05 6100.00 6808 6266.05 6200.00 6929 6366.05 6300.00 1611.79 S 204.75 W 471.17 26.01 1683.75 S 217.37 W 495.04 23.87 1754.85 S 230.09 W 518.39 23.36 1826.46 S 243.31 W 542.11 23.71 1892.96 S 259.11 W 563.26 21.16 7048 6466.05 6400.00 7168 6566.05 6500.00 7290 6666.05 6600.00 7412 6766.05 6700.00 7536 6866.05 6800.00 1956.24 S 276.55 W 582.88 19.62 2019.42 S 295.97 W 602.76 19.87 2085.31 S 316.11 W 624.20 21.45 2152.11 S 338.77 W 646.58 22.38 2220.80 S 361.43 W 670.00 23.42 SPE f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING DBU/E-39 500292258700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 5/95 DATE OF SURVEY: 100495 JOB NUMBER: AK-MM-950949 KELLY BUSHING ELEV. = 66.05 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SI/B-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7659 6966.05 6900.00 2290.58 S 381.25 W 693.56 23.55 7783 7066.05 7000.00 2362.03 S 398.60 W 717.68 24.12 7908 7166.05 7100.00 2435.50 S 412.90 W 742.60 24.92 8033 7266.05 7200.00 2509.10 S 427.56 W 767.63 25.03 8158 7366.05 7300.00 2581.46 S 444.27 W 792.19 24.56 8280 7466.05 7400.00 2650.81 S 459.90 W 814.89 22.70 8401 7566.05 7500.00 2714.88 S 477.43 W 834.96 20.07 8517 7666.05 7600.00 2772.10 S 496.39 W 851.75 16.78 8630 7766.05 7700.00 2820.86 S 512.52 W 864.18 12.44 8739 7866.05 7800.00 2863.47 S 527.24 W 873.89 9.71 8848 .7966.05 7900.00 2903.93 S 539.78 W 882.50 8.61 8955 8066.05 8000.00 2939.70 S 549.46 W 889.17 6.67 9058 8166.05 8100.00 2964.76 S 553.35 W 892.45 3.28 9159 8266.05 8200.00 2978.26 S 549.60 W 893.47 1.02 9261 8366.05 8300.00 2988.94 S 534.60 W 895.28 1.81 9369 8466.05 8400.00 2998.24 S 496.15 W 903.12 7.84 9486 8566.05 8500.00 2992.86 S 436.27 W 920.26 17.15 9615 8666.05 8600.00 2956.19 S 362.95 W 949.71 29.44 9754 8766.05 8700.00 2909.43 S 279.60 W 988.18 38.47 9956 8866.05 8800.00 2820.86 S 128.76 W 1090.63 102.45 10931 8944.19 8878.14 2307.96 S 690.06 E 1986.81 896.17 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISS~JI'~ APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __ Change approved program x Puli tubing __ Variance __ Perforate __ Other__ 2. Name of Operator BP Exploration 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development x Exploratory __ Stratigraphic __ Service 4. Location of well at surface 3358' NSL, 501' WEL, SEC. 6, T11N, R14E At top of productive interval 645' NSL, 478' WEL, SEC. 6, T11N, R14E At effective depth N/A At total depth 1075' NSL, 5121' WEL, SEC. 5, T11N, R14E 6. Datum elevation (DF or KB) KBE = 66 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number E-39 9. Permit number 95-126 10. APl number 50- 029-2258701 11. Field/Pool Prudhoe Bay Field/Off Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor Surface Intermediate 10017' Production Liner Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Size feet feet feet feet Plugs (measured) Junk (measured) Cemented 385 sx Class 'G' Measured depth True vertical depth 10050' 8879' 13. A~achments Description summary of proposal × Detailed operations program __ BOP sketch 14. Estimated date for commencing operation September 25, 1995 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'f~ / ~ Title Senior Drilling Engineer --/' ( / FOR COMMISSION USE ONLY Conditions of approval: Notify Comrrfi~sion so representative may witness Plug integrity __ BOP Test__ Mechanical Integrity Test __ Approved by order of the Commission Form 10-403 Rev 06/15/88 Location clearance Subsequent form required 10- ~ O 7' Original Signed 8~ David W. dohnstop I Approval NO./~'~.-/~, ~, Approved dopy Returned J _ Cumu,ss .~nc-~ Date SUBMIT ir(! TRIPLICATE ,~-39 sundry Proposal Well is currently permitted for a full intermediate string of 7" 29 ppf casing from 33' to 10,050' md. After further review of the casing design, it is proposed to modify this 7" casing string as follows: Top Bottom ~' ~ T 7" 26 ppf 33' 9467' ~.',.¢,~"8~0 r~0 ~'~o ~;~f 7" 29 ppf 9467' 10050'. tv.-r ~o ~,~ ~o,~o -r I~ MEMORANDUM TO: David Jo~ Chairman THRU: State of Alaska Alaska Oil and Gas Conservation Commission DATE: September 15, 1995 Blair Wondzeil, P. I. Supervisor FROM: Lou Grimald~~ S UBJEOT: Petroleum Inspector FILE NO: EHRJIOCD.DOC Diver[er Inspection Nabors rig ¢28-E BPX well ¢E-39 Prudhoe Bay Field PTD ¢95-126 Friday, September 15, 1995; I witnessed the function test of the Diver[er system on Nabors rig ¢28-E which was preparing to drill BPX well ¢E-39 in the Prudhoe Bay Field. The flowlines from the adjacent wells were in such close proximity to the rig that it necessitated terminating the 16" vent line at 47'. I authorized the rig to put a slight upswing in the vent line so as to direct the possible blast up and over the existing flowlines. This allowance was for this well only and should be avoided as the outside ambient temperature drops in the upcoming months. The Diver[er functioned properly with a quick closure time of 52 seconds. I found a problem with the accumulator set, Once the Diver[er was actuated there was a tendency for the hydraulic reserves to bleed down. This was due to the accumulators valving not completing its travel. Mike Downey will have this repaired and report to me. SUMMARY: I witnessed the function test of the Diver[er system on Nabors rig ¢28-E. I found a problem with the rigs accumulator system. Attachments: EHRJIOCD.XLS CC: Tom Horten/Scott Sigurdsen (Prudhoe Bay Drilling) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report Date: 9/15/95 Operation: Development X Exploratory: Drlg Contractor: Nabors Rig No. 28E PTD # 95-126 Rig Ph. # Operator: BPX Oper. Rep.: Kirk White Well Name: E-39 Rig Rep.: Mike Downey Location: Sec. 6 T. 11N R. 14E Merdian Umiat 659-4863 MISC. INSPECTIONS: ACCUMULATOR SYSTEM: Location Gen.: OK Well Sign: OK Systems Pressure: 3000 psig Housekeeping: OK (Gen.) Drlg. Rig: OK Pressure After Closure: 1800 psig Reserve Pit: N/A Flare Pit: N/A 200 psi Attained After Closure: 0 min. 31 sec. Systems Pressure Attained: 2 min. 21 sec. DIVERTER SYSTEM INSPECTION: Nitrogen Bottles: Eight Bottles Diverter Size: 20 in. 2000 psig Divert Valve(s) Full Opening: YES Valve(s) Auto & Simultaneous: YES MUD SYSTEM INSPECTION: Light Alarm Vent Line(s) Size: 16" in. Trip Tank: OK OK Vent Line(s) Length: 47 ft. Mud Pits: OK OK Line(s) Bifurcated: NO Flow Monitor: OK OK Line(s) Down Wind: YES Line(s) Anchored: YES GAS DETECTORS: Light Alarm Turns Targeted / Long Radius: N/A Methane OK OK Hydrogen Sulfide: OK OK ..................................................... .................................................................... ......................................................................... is higher elevation// Edge of Reseve pit ~ than flow line/C// Wind ///~ "' Manifold ~ Building_ ~ 100' ~ ' (~ ~-~ 10' --~ Rig Non Compliance Items 1 Repair Items Withi 1 Day (s) And contact the Inspector @ 659-3607 Remarks: Diverter functioned properly. Actuator valves on accumulator panel did not travel full}, and bled accumulator down. Adjust and check. Disl]ibulJon orig.- Well File c - Oper/Rep c- Database c - Tdp Rpt File c- Inspector AOGCC REP.: OPERATOR REP.' EHRJIOCD.XLS Louis R Grimaldi Mike Downey DVTRINSP.XLT (REV. 1/94) TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501 o3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 August28,1995 Terry Jordan, Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit E-39 BP Exploration (Alaska), Inc. Permit No 95-126 Surf Loc 3358'NSL, 501'WEL, Sec. 06, TllN, R14E, UM Btmhole Loc 1075'NSL, 5121'WEL, Sec. 05, T11N, R14E, UM Dear Mr. Jordan: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector 659-3607. Chairm~ BY ORDER OF THE COMMISSION /encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill I--Illb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 66 fe et Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. Q. Box 196612, Anchoraae. Alaska 99519-6612 ADL 028304 4. Location of well at surface '7. Unit or property Name 11. Type Bond(see 2o A^C 25.025) 3358' NSL, 501' WEL, SEC. 6, T11N, R14E Prudhoe Bay Unit At top of productive interval 8. Well number Number 645' NSL, 478' WEL, SEC. 6, T11N, R14E E-39 2S100302630-277 At total depth 9. Approximate spud date Amount 1075' NSL, 5121' WEL, SEC. 5, T11N, R14E 09/01/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD a~d'rVD) property line ADL 028299 4205 feet No Close Approach feet 2560 10819'MD/8906' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^AC 25.035 (e)(2)) ;Kickoff depth 300 feet Maximum hole angle 88 o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.511 H-40 Weld 80' 35' 35' 115' 115' 260 sx Arcticset (Approx.) 12-1/4" 9-5/8" 40tt NT80 BTC 3578' 34' 34' 3612' 3600' 975 sx cs///, 375 sx 'G', 250 sx CS// 8-1/2" 7" 2911 L-80 NSCC 10017' 33' 33' 10050' 8879' 385 sx Class 'G' 6" 4-1/2" 12.611 L-80 NSCT 919' 9900' 8845' 10819' 8906' 130 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth pict [] Refraction analysis l-I Seabed report[] 20 AAC 25.050 requirementsl-I 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed y~,4~ ?~CommissionTitleSeni°rDri//ingEn~/ineeruse Only Date ~-/1~*~ Permit NUmber APl number Approval date _ |See cover letter ~%'-'--/,2, ~' 5 O- 0~-, ~' - ~, .2. ~' 7 '~' "'Z.-':~' c~--~for other requirements Con'ditions'of approval Sam,pies required [] Yes ];~ No Mud Icg required []Yes No Hydrogen sulfide measures .~1 Yes [] No Directional survey required J~ Yes [] No Required working pressure for I~¢;;~al~. ¢ffCl~dl~SM; 1~5M; •10M; r-115M; Other: by order ofV~"/"~ ~/~ Approved by David W. dohnston Commissioner me commission Date Form 10-401 Rev. 12-1-85 Submit in tri ~licate I Well Name: IE-39 Well Plan I Type of Well (producer or injector): [Producer Summary I Surface Location: 3358' FSL 501' FEL Sec 6 T11N R14E Target Location: Bottom Hole Location: 645' FSL 478' FEL Sec 6 T11N R14E (start of horizontal) 1075' FSL 159' FWL Sec 5 TllN R14E (end of horizontal) [ AFE Number: 14P0681 I IEstimated Start Date: 9-1-95 [Rig: [ Nabors 28-E) Operating days to complete: MD: I 10,819' I ITVD: I 8,906' Well Design (conventional,slimhole,etc.) 22 ] RT-GL I 35.1' ! KBE-MSL 65.6' Ultraslimhole Zone 1 Horizontal Formation Markers: Formation Tops MD TVD(RKB) Permafrost 1972' 1966' SV3 3649' 3636' Ugnu Sand 4A 4851' 4686' Seabee 6915' 6356' Highest Oil Sand 8000' 7200' , Kingak 8611' 7741' Sag River 9275' 8376' TSAD 9358' 8451' Zone 3 9502' 8571' Zone 2C 9558' 8616' CGOC 9789' 8791' Zone lB 9852' 8826' 7" Casing Point 10050' 8879' Total Depth 10819' 8906' End Cemented Liner Casing/Tubing Program: Hole Csg/ 'Wt/Ft Grade Conn Length Top Btm Size Tbg MD/TVD MD/TVD O.D. 30" 20" 91.5# H-40 Weld 80' 35'/35' 115'/115' 12-1/4" 9-5/8" 40# NT80 BTC 3578' 34'/34' 3'612'/3600' 8-1/2" 7" 29# L-80 NSCC 10017' 33'/33' 10050'/8879' 6" 4-1/2" 12.6# L-80 NSCT 919' 9900'/8845' 10819'/8906' '(solid) Tubing 3-1/2" 9.2# L-80 NSCT 9818' 32'/32' 9850'/8826' Logging Pro [Open Hole Logs: 12-1/4" Hole 8-1/2" Hole 6" Hole Cased Hole Logs: · ;ram. None MWD: GR from TSAG to Horizontal Neutron tool should be picked up at the top of the build section. MWD: GR/Resistivity LWD in horizontal section 7" Casing None VHH E-39 Well Plan Page 2 Date Revised' 8/17/95 Mud Program: Surface Mud Properties: I 12-1/4" hole section: SPUD Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 0' 8.5 + 300 40-60 30-60 50-80 9-10 15-25 3,612' 9.5 100-200 25-50 15-25 25-40 9-10 15-25 Hazards/Concerns No special hazards are ,expected. Intermediate Mud Properties: I 8-1/2" hole section to horizontal: LSND Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 3,612' 8.8-9.0 35-40 8-12 3-6 8-10 9.0-9.5 8-12 5,000' > 9.5 40-45 10-12 4-8 8-12 9.0-9.5 6-8 8,500' 9.7-9.8 40-45 10-12 4-8 8-12 9-10 <6 HTHP- 15.0 10,050' 9.7-9.8 40-45 10-12 4-8 8-12 9-10 <6 HTHP- 15.0 Hazards/Concerns Cretaceous Overpressure expected - plan MW to at least 9.5 ppg. Utilize hi vis sweeps to assist hole cleaning Treat with Boreplate, Barotrol, & Baranex as needed before entering Kingak. Monitor LSYP and increase if problems occur trying to clean the hole. Reduce API fluid loss to <6 cc before drilling Kingak Section. Production Mud Properties: 16" hole section: Xanvis KCL Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 10,050' 8.9-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 10,819' 8.9-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Hazards/Concerns Lost Circulation still a possibility due to severe overbalance in Sadlerochit. Differential sticking possible with overbalance situation. Perform/report daily checks on KCI concentrations in Xanvis KC1 system. Lubetex will be included into the initial fluid makeup. Add more lubetex if needed. Directional- · I KOP: 1300' Maximum Hole Angle: 88.0° Tangent Angle 36° Close Approach Well: None The above listed wells will be secured during the close approach. Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Please ensure that the diverter lengths and specifications on file with the State match what is present at the rigsite. V H H E-39 Well Plan Page 3 Date Revised' 8/17/95 E-39 Addition to Permit to Drill Request for Annular Injection Disposal: Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: All drilling and completion fluids can be annular injected. Request to have well E-39 for annular pumping. Request to AOGCC for Annular Pumping Approval for E-39: 1. Approval is requested for Annular Pumping into the E-39 9-5/8" x 7" casing annulus. . Aquifers in the Prudhoe Bay Field Western Operating Area (including K Pad) have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #1 as referenced in Area Injection Order #3. There are no domestic or industrial use water wells located within one mile of the project area. 3. The 9-5/8" casing shoe will be set at 3612' MD (3600' TVD) which is below the Permafrost and in shale formations in the Sagavanirtok above the Ugnu Formation. . The burst rating (80%) for the 9-5/8" 40# NT-80 casing is 4,600 psig while the collapse rating (80%) of the 7" 29# L-80 casing is 5,615 psig. The break down pressure of the Ugnu formation is 13.5 ppg equivalent mud weight. The Maximum Allowable Surface Pressure while annular pumping is calculated according to the following equation and is 4095 psi for a 10.0 ppg fluid in this well (Assumes worst case in which 7" casing is filled with gas). MASP - 5615 psig - ((fluid density ppg - 1.9) X 0.052 X 9-5/8" Casing Shoe TVD) 5. A determination has been made that the pumping operation will not endanger the integrity of the well being drilled by the submission of data to AOGCC on 7/24/95 which demonstrates the confining layers, porosity, and permeability of the injection zone. 6. The cement design for this well ensures that annular pumping into hydrocarbon zones will not occur. AREA WELL PREV VOL PERMITTED PERMITTED INJECTED VOL DATES (aBES) (aBES) Prudhoe Bay E- 3 9 0 0 Submitted for 1995 Submitted toAOGCC 8 ! 1 7/9 5 Prudhoe Bay E-3 8 0 0 Submitted for 1995 PLEASE NOTE EARLIER PERMITTED WELLS. PrudhoeBay E-31 1,641 35,000 Submitted for 1995 PrudhoeBay E-34 1,400 35,000 Submitted for 1995 Prudhoe Bay E-35 4,527 35,000 Submitted for 1995 Prudhoe Bay E-36 9,271 35,000 Submitted for 1995 Prudhoe Bay E-37 0 35,000 ~Submitted for 1995 DO NOT EXCEED 35,000 BBLS IN ANY ANNULUS. PROPOSED DRILLING AND COMPLETION PROGRAM WELL E-39 1. MIRU. NU diverter and function test same. 2. Drill 12-1/4" hole. Run and cement 9-5/8" 40# NT-80 BTC casing to surface. o Install blowout prevention equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer. Test BOPE to 5,000/250 psi. o Test 9-5/8" casing to 3,000 psi for 30 minutes. A formation leak-off test will be performed 10' below the 10-3/4" shoe to a minimum of 12.5 ppg EMW. o Directionally drill 8-1/2" hole & building to horizontal target in Zone 1 of the Sadlerochit @ 10,050' MD/8,879' TVD. TIH w/8-1/2" hole opener if needed. Run 7" 29# L-80 NSCC casing and cement with Class G cement to 1000' MD above the top of the hydrocarbon-bearing sand @ 8,000' MD. The annulus will be freeze protected with dry crude if not annular injecting. Test casing to 3,500 psi. o TIH w/6" BHA. PU 3-1/2" DP. Drill 10' of new hole and displace to Xanvis KC1 mud system. Directionally drill the 6" horizontal hole to TD. RIH w/6" hole opener and 7" scraper spaced out to near the bottom of the 7" casing. Circulate horizontal section clean. ° Run 4-1/2" 12.6# L-80 NSCT solid liner with liner hanger. The liner will be set at TD and lapped +150' inside 7-5/8" casing shoe. Cement liner in place with sufficient cement to fill entire liner annulus. Make cleanout run. Test liner and liner lap to 3,500 psi for 30 minutes. Displace Xanvis KC1 mud with filtered seawater. ° Run 3-1/2" L-80 tubing with SSSV, GLM's, and 7" x 3-1/2" packer assembly. Circulate corrosion inhibitor into tubing annulus. Set packer and test tubing annulus w/3,500 psi. 9. Set BPV. ND BOPE. 10. Freeze protect well to 2200' TVD through shear valve in top GLM station. Release rig. Drilling Hazards · One hydrocarbon-bearing zone is found above the Sag River formation @ 8,000' md based on E Pad logs. The zone is expected to be normal pressure with a relatively low permeable sand. · A minimum of 9.5 ppg mud weight will be used to drill the Cretaceous injection interval. This will allow a 100 psi trip margin over the expected 9.0 ppg EMW @ 4000' sstvd. · A range of mud weights from 8.9 ppg to 9.0 ppg will be used to drill the Sadlerochit interval after intermediate casing has been set. Well Plan Summary CASING SIZE: 9-5/8" 9-5/8" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CIRC. TEMP: 40°F PREFLUSH: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET 111 ADDITIVES: retarder WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx APPROX. 4/SACKS: 975 MIX WATER: 10.53 gps THICKENING TIME: > 4 hrs TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 + 1.0 ghs FP-6L WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx APPROX. #SACKS: 375 MIX WATER: 4.95 gps THICKENING TIME: > 3-1/2 hrs TOP JOB CEMENT TYPE: COLD SET II ADDITIVES: WEIGHT: 14.95 ppg APPROX. # SACKS: 250 YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps THICKENING TIME: Greater than 2 hrs @ 50°F CENTRALIZER PLACEMENT: 1. Run 1 bow type centralizer per joint for the first 15 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME: 1. Lead slurry from TD to surface w/100% excess (less the tail slurry volume). 2. Tail slurry volume 375 sx (to cover 500' of casing shoe w/100% excess). 3. Top job volume 250 sx. Well Plan Summary 7" CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 7" CIRC. TEMP: 140°F PREFLUSH: 20 bbls fresh water SPACER: 70 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 0.4% FL-52 + 0.5% CD-32 + 3% A-2 + 1.0 ghs FP-6L WEIGHT: 11.0 ppg APPROX. # SACKS: 110 YIELD: 3.31 ft3/sx MIX WATER: 20.92 gps THICKENING TIME: 5+ hrs WEIGHT: 15.8 ppg APPROX. # SACKS: 275 FLUID LOSS: 100 to 150 cc/30 minutes FLUID LOSS: 150-200 cc/30 minutes FREE WATER: 0 cc TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1.0 ghs FP-6L YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps THICKENING TIME: 3-1/2 to 4-1/2 hrs FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Two 8-1/4" x 7" Turbulators per joint f/TD to 300' MD above top of Sag River. Estimated Interval: 10,050' to 8,975' md - _ 54 turbolators needed. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-10 bpm. (See Cement Guidelines for more about displacement rates) Batch mix the tail slurry. CEMENT VOLUME: 1. Tail slurry to 8,275' MD (1000' above Top Sag) 2. Lead slurry to 7,000' MD (1000' above highest oil bearing zone @ 8,000' md) 2. 80' MD 7" 29# capacity for float joints. Well Plan Summary CASING SIZE: 4-1/2" 4-1/2" PRODUCTION LINER CEMENT PROGRAM - BJ SERVICES CIRC. TEMP 140° F SPACERS: 20 bbls water 70 bbls MCS-4 Spacer (weighted one ppg over current MW). CEMENT TYPE: Class G ADDITIVES: FL33: 0.25%, BA86-L: 150 ghs, S-400: 0.2% (by vol.) WEIGHT: 15.7 ppg YIELD: 1.17 ft3/sx APPROXIMATE SACKS: 130 FLUID LOSS: <50 cc @ 140° F CD32: 0.6%, FP-6L: 1 ghs, R-l: TBD A2: 0.2%, Gel 0.5%, MIX WATER: 3.58 gps THICKENING TIME: 2-1/2 to 3 hrs FREE WATER: 0.0 cc CENTRALIZER PLACEMENT: 1. Two 5-7/8" x 4-1/2" turbolators per joint from TD to 7" casing shoe. Estimated Interval: 10,819 to 10,050' md - _+ 38 turbolators needed. 2. One 5-7/8" x 4-1/2" turbolator per joint in liner lap (none opposite intermediate casing shoe). Estimated Interval: 10,050' to 9,900' md - +3 turbolators needed. CEMENT VOLUME: 1. Open hole (6" x 4-1/2") + 30% excess (adjust if a caliper log is run - caliper + 20%). 2. 80' for 4-1/2" shoe joints. 3. 150' liner lap. 4. 200' of cement on top of the liner in the 7" casing (assume no DP present). Well Plan Summary ~rcd ~ervlccs Dr'il .4 .~ Si. aLe Plane: Zone/ ~ : WOA: E-Pad -39 As--built 1!i--39 Wpl4 Preliminary Po~x BBB& ~634 ~ LI~ W664434 ~91~0? ~ OD MD [nc Az~ TVD N/$ E/w 9 5/8 in 3612 13.49' 192.17' 3600 127 $ 100 £. 7 ~n [0050 88.00° 56.00' B879 2713 4 t/2 in 10819 88.00' 56.00' 8906 22B4 S 660 VERTICAL VIEW SCALE ~00 ft. / DIVISION TVD REF: WELLHEAD VERTICAl, SECTION REP: WELLHEAD - 0--~ 0.00' ~ 0 MD TIE IN WELLPLAN FEASIBILITY STUDY Thl~ plan I~ for feasibility purposes only it has not yet been certifiedl B/1!195 3,33 pm HORIZONTAl, VIEW (TRUE NORTII) SCALE 600 It./ DIVISION SURVEY REF: WELLHEAD - - - oo HALL [ I]LJM1 []N 300 500 -- !000-- 1097 1196 - 1500-- 1966 1994~' 2000 2500 2800 3ooo.--I I ~ 0.00' ~ 300 MD 0 , ! 00' ~ 400 MD 2.00' ~ 500 MD 3.00' ~ 600 MD 4 00' @ 700 MD ? 5.00' ~ B00 MD 6.00' ~ 900 MD  7.00' ~ 1000 MD 33 8.00' ~ 1100 MD 41 T B.O0' ~ 1200 MD ~ 7.00' ~ 1300 MD ~ 6.00. e 14oo MD ~ 5.00' ~ 1500 MD ~ 4.00. e ~6oo MD 3.00' e 1700 MD 2.00' @ 1800 MD 74 74 -- --74 ' KOP / START OF BUILD I END OF BUILD START OF CURVE ~ l.O0'/lO0 Ft 0.28' ~ 1972 MD Bose permafrost 0.00' ~ 2000 MD END OF CURVE 0.00' ~ 2806 MD !.50' ~ 2906 MD 3.00' ~ 3006 MD START OF BUILD ~ I 50'/I00 Ft 6356 _ 192..50 --1000 t---1500 4 1/2 ,n OD, ~ I B19 MD, 8906 ' ~500 ~P. 8879 TV ~* % ~--3000 34631 3soo~ 3636~ 4000-..--, 4412 4500-- 4686-- 5000~ 55001 6000 -- 6356-- 6500~ 7000 7500 75E0 774~ i I000 -- 125-- 158 4.50' ~ 3106 MD 6.00' l~ 3206 MD 7.50' ~ 3306 MD 10.00' ~ 3473 MD START I]F CURVE ~ 2.50'/100 Ft 9 5/8 in OD, 8 3612 MD, 3600 TVD i4,41' ~ 3649 MD SV3 N 17.50' 8 3778 MD ~ · 20.00' ~ 3~73 MD 1000 500 0 SO0 ~ 22,50' ~ 3973 ND l~ 27.50' ~ 4173 ~D '~ 32.50' ~ 4373 MB 479-- --~ 36.00' ~ 4513 MD END OF CURVE  CRITICAL ¢D[NT DATA - 653 -- ~ 36.00' ~ 48=1 MD UG4A r~£ ;. o o.oo' ~lo oo' ~ ~ BUILD E ~ END OF BUILDI100 8,00' ~ START ar 1~000.00'ILO00' ~ ' CURVE E ~ a~se :9720.~8'1~0.00' ~ pe~oFrast ~ END OF CURVE2000O OO'192.00'  . . · ~ J 14.00'/100 Ft ~ [EN~ OF CURVE~50 ~9.0~'64.3~' ~ 36.00' ~ 8354 MD JZone [B 985260.53'59.67' E46~ ~/ST~T ~ CURVE E 400'/100 Ft 114P 9eSE 6I .98' 59.44' .... ~-o~ ..... ~ ' Jl3P 9959 75,36' 57.56' ~ ~5 7i' J 861I MD IKRU / L~ J[ND OF CURVE I0049 88.00' 56.00' ~/ ' ll~N ~0533 80.00' ~6.00' .... 25762576 ...... ~f~0~/ · 00' ~ 8754 MD JEtarg4t0OJ'~__Etarg4 t0BI988.00' 56.00' ~~s.oa' e aa79 ~o START ~ CURVE J 8.00' 100 ~ - ~6~7 ..... ~/t3.~8' J 8909 ~D TJO ..... ~664 ...... ~ ~1t.53' E 9098 ~D TJ~ J /// 36.00' ~ 9457 ~O END OF CuRvE ~/~ o~ r u v ~. ~ -- c~v~ ..... ~~60-53' e 98~2 Mp Zo~e 1~ ~ ~btJ 24~~ ~' --~ ~ ~ 8B.O0' ~ 10049 ~P ENO OF CURVE 8377 7 ~n OD ~ 10050 ~D. 8879 TV~ 4 i/~ in OD, ~ 108i9 MD, ~906 TVD88.00' E 10533 MD 88.00' ~ ~0819 MD 300 1097 1t96 24 1966 43 1994 43 2000 43 3463 JO0 3636 I36 4~2 493 4606 607 6356 1871 7§20 ~697 7741 2826 7991 2917 8021 2924 8206 2953 8376 8953 8456 ~949 8451 2944 8534 2986 8571 2916 8616 2904 8641 2897 6675 2888 8696 2BBl 87~6 2871 8791 8840 8826 8814 8831 28t0 8866 ~763 0879 27[4 8896 2444 890~ 2283 3500 65 118 E 118 E 116 r 106 E 98 £ 24 ~ 206 V 469 V 498 V $20 v 521 v 4~ ~3~ 422 ~ 378 ¥ 347 317 ~ 300 v 277 ~ ~6~ ~41 ~ 182 w 137 v 129 ~ 22 E 423 [ -500 0 500 1000 1500 2000 2500 3000 VERTICAL SECTION PLANE: 163.87 PROPOSED BHL TVD 8905.80 MD 10819.47 VS 2377.04 N/S 2283.48 S ~/W 880.41 E Dote Plotted Creote~ By Checked By Approved By Dote 8111/95 EEL i:;'ER'MiT cHEC'K£1sT" 1. 2. 3. 4. 5. 6. ~ 7. 8. 9. 10. 13. - ~.N~iN~.i~.RiN~ ......... , ,, Permit fee attached .................. Lease number appropriate ............... Unique well name and number .............. Well located in a defined pool ............. Well located proper distance from drlg unit boundary. Well located proper distance from other wells ..... Sufficient acreage available in drilling unit ..... If deviated, is wellbore plat included ........ Operator only affected party .............. Operator has appropriate bond in force ......... Permit can be issued without conservation order .... Permit can be issued without administrative approval. Can permit be approved before 15-day wait ....... ' =SOL6SM 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg.. N 17. CMT vol adequate to tie-in long string to surf csg . - 18. CMTwill cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............ 21. If a re-drill, has a 10-403 for abndnmnt been approved.. 22. Adequate wellbore separation proposed ......... ~Y~ N 23. If diverter required, is it adequate .......... ]~ N 24. Drilling fluid program schematic & equip list adequate N 25. BOPEs adequate .................... N 26. BOPE press rating adequate; test to .~'-d)~g-~ psig~ N 27. Choke manifold complies w/A~I RP-53 (May 84) ...... 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............ ~ N 30. Permit can be issued w/o hydrogen sulfide measures .... Y N/~'__ 31. Data presented on potential overpressure zones ..... Y /~ ~ 32. Seismic analysis gf shallow gas zones .......... y N ~ ~ ~ 33. Seabed condition survey (if off-shore) ........ ./~ N ~ -- ' 34. Contact name/phone for weekly progress reports . . ./. Y N [exploratory only] ' 'G'K-0LOGY: ......... ENGYN~ERT'NG: ~0MMT-s's IoN; Cc~m~n~s / Instructions: HOW,']o - A:~FORMS~heldist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding informatior~, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ,o Tape ~ubfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 6571.00 R. JACKSON W. HELMS E-39 500292258700 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 25-JAN-96 MWD RUN 5 R. JACKSON W. HELMS MWD RUN 6 R. JACKSON W. HELMS JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 7 R. KRELL W. HELMS MWD RUN 8 R. KRELL W. HELMS MWD RUN 9 R. KRELL W. HELMS MWD RIIN 10 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: R. KRELL W. HELMS WELL CASING RECORD MWD RUN 11 P. ROBERTS W. HELMS 6 liN 14E MWD RUN 12 P. ROBERTS W. HELMS 335~8Z M~C~OFI~~[~ 6 6.0 5 64 55 30.50 OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 30.000 20.000 115.0 12.250 9.625 3641.0 8.500 7.000 10067.0 6.000 10930.0 MWD - DGR/EWR4/CNP. ALL DEPTHS ARE MEASURED BIT DEPTHS. MWD RUNS 1 - 3 ARE DIRECTIONAL ONLY & NO DATA IS PRESENTED. MWD RUNS 4, 5, 6, & 8 ARE DIRECTIONAL WITH GAMMA RAY (NGP/SGRD). MWD RUNS 7 & 9 ARE DIRECTIONAL WITH GAMMA RAY (DGR/ SGRC), & COMPENSATED NEUTRON POROSITY (CNP/SPSF). RUN 7 IS A MEASURED AFTER DRILLING (MAD) PASS, WHICH WAS PERFORMED WHILE ROTATING THE DRILL STRING. THE UPPER PORTION OF RUN 9, DOWN TO 9885', IS A SLIDING MAD PASS (THE LOWER PORTION IS DRILLING). MWD RUNS 10, 11, a 12 ARE DIRECTIONAL WITH GAMMA RAY (DGR/SGRC), AND 4-PHASE RESISTIVITY (EWR4) . GAMMA RAY DATA FROM 8800 - 9833' MD WAS ACQUIRED WITH A SCINTILLATION DETECTOR (NGP) . ALL OTHER GAMMA RAY DATA WAS ACQUIRED USING GEIGER MUELLER DETECTORS (DGR). NO DEPTH SHIFTING WAS DONE AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP NPHI $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 8843.0 10883.0 10067.0 10890.0 9335.0 10036.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 4 8915.0 9213.0 5 9213.0 9541.0 6 9541.0 9700.0 8 9700.0 9885.0 9 9885.0 10085.0 10 10085.0 10153.0 11 10153.0 10616.0 12 10616.0 10930.0 MERGED MAIN PASS. THE CNP DATA FROM 9335 - 9885' MD IS MEASURED AFTER DRILLING (MAD). IT COMES FROM MAD PASS 7 & THE BEGINNING OF RUN 9 WHICH IS ALSO A WIPE PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 10 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI RPX MWD 68 1 OHMM API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 120 46 1 3 RP S MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 NPHI MWD 68 1 PU-S 4 7 FCNT MWD 68 1 CPS 4 8 NCNT MWD 68 1 CPS 4 9 FET MWD 68 1 HR 4 10 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 186 4 90 120 46 4 90 120 46 4 90 120 46 4 90 890 01 4 90 334 31 4 90 334 30 4 90 180 01 A 90 810 01 4O Tape File Start Depth = 10931.000000 Tape File End Depth = 8800.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 46894 datums Tape Subfile: 2 300 records... Minimum record length: Maximum record length: 62 bytes 1018 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR NPHI $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: CN WN FN COUN STAT START DEPTH STOP DEPTH 9342.0 9885.0 9335.0 9885.0 MAD RUN NO. MAD PASS NO. MERGE TOP 7 1 9378.0 9 1 9460.0 MERGE BASE 9460.0 9885.0 MERGED MAD PASSES. $ : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 4 2 NPHI MAD 68 1 PU-S 4 3 FCNT MAD 68 1 CPS 4 4 NCNT MAD 68 1 CPS 4 5 RATE MAD 68 1 FPHR 4 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 28 Tape File Start Depth = 9900.000000 Tape File End Depth = 9330.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6847 datums Tape Subfile: 3 53 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is tYPe: LIS FILE HEADER FILE NUMBER: 3 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8843.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9140.0 23-SEP-95 ISC 2.11 CIM 3.94 MEMORY 9213.0 8915.0 9213.0 0 7.8 22.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP 235 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 3641.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.80 46.0 9.3 700 4.6 .000 .000 .000 .000 .0 137.5 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 4. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 9215.000000 Tape File End Depth = 8835.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 49178 datums Tape Subfile: 4 73 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9140.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9475.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 5. 24-SEP-95 ISC 2.11 CIM 3.94 MEMORY 9541.0 9213.0 9541.0 0 8.5 34.6 TOOL NUMBER NGP 235 8.500 3641.0 LSND 9.80 41.0 8.9 700 4.4 .000 .000 .000 .000 .0 133.2 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length TIP TIP Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 9550.000000 Tape File End Depth = 9135.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9341 datums Tape Subfile: 5 73 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9420.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9655.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 6. 25-SEP-95 ISC 2.11 CIM 3.94 MEMORY 9700.0 9541.0 9700.0 0 38.1 41.8 TOOL NUMBER NGP 235 8.500 3641.0 LSND 9.80 45.0 9.1 700 13.8 .000 .000 .000 .000 .0 141.6 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 7 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 Tape File Start Depth = 9705.000000 Tape File End Depth = 9415.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 50922 datums Tape Subfile: 6 70 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9625.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9833.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 8. 27-SEP-95 ISC 2.11 CIM 3.94 MEMORY 9894.0 9700.0 9894.0 0 43.0 59.0 TOOL NUMBER NGP 235 8.500 3641.0 LSND 9.80 43.0 9.2 600 4.4 .000 .000 .000 .000 .0 129.0 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 7 Tape File Start Depth = 9890.000000 Tape File End Depth = 9620.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10965 datums Tape Subfile: 7 70 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9391.0 CNP 9383.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXI~ ANGLE: STOP DEPTH 10044.0 10036.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 28-SEP-95 ISC 2.11 CIM 3.94 MEMORY 10085.0 9432.0 10085.0 0 32.0 77.3 TOOL NUMBER P0432CRNG6 P0432CRNG6 8.500 3641.0 LSND 9.80 48.0 9.1 600 4.5 .000 .000 .000 .000 .0 142.0 .0 .0 SANDSTONE .00 .000 .0 0 REMARKS: CN WN FN COLIN STAT MWD RUN 9. $ : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 FCNT MWD 68 1 CPS 4 4 NCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 890 01 1 4 90 334 31 1 4 90 334 30 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 34 Tape File Start Depth = 10090.000000 Tape File End Depth = 9380.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 59449 datums Tape Subfile: 8 99 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9929.0 EWR4 9932.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 10105.0 10112.0 01-0CT-95 ISC 2.11 CIM 3.94 MEMORY 10153.0 10085.0 10153.0 0 78.8 81.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS 4 $ TOOL NUMBER P0433SP4 P0433SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 10067.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO PRO 8.80 51.0 8.9 39000 5.6 .130 .049 .090 .110 62.0 176.0 68.0 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 ,000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 10. $ : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 RPX MWD 68 1 OHMM 3 RPS MWD 68 1 OHMM 4 RPM MWD 68 1 OPIMM 5 RPD MWD 68 1 OHMM 6 FET MWD 68 1 HR 7 ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) Total Data Records: 16 998 BYTES * Tape File Start Depth = 10160.000000 Tape File End Depth = 9920.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14814 datums Tape Subfile: 9 81 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10019.0 EWR4 10025.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10570.0 10577.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DU.~J~ GAl~ RAY EWR4 ELECTROMAG. RESIS 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 02-OCT-95 ISC 2.11 CIM 3.94 MEMORY 10616.0 10153.0 10616.0 0 85.2 92.5 TOOL NUMBER P0433SP4 P0433SP4 6.000 10067.0 FLO PRO 8.90 52.0 9.9 45000 4.6 .110 .050 .100 .090 63.0 158.0 68.0 69.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 11. $ : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 40 Tape File Start Depth = 10625.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 69298 datums Tape Subfile: 10 105 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10563.0 EWR4 10564.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10883.0 10890.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 03-0CT-95 ISC 2.11 CIM 3.94 MEMORY 10930.0 10616.0 10930.0 0 84.4 88.3 TOOL NUMBER P0433SP4 P0433SP4 6.000 10067.0 FLO PRO 8.80 51.0 9.0 37000 4.6 .120 .050 .080 .100 65.0 162.0 69.0 68.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 12. $ : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MW-D 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 24 Tape File Start Depth = 10931.000000 Tape File End Depth = 10560.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 20759 datums Tape Subfile: 11 89 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 12 is type: LIS FILE HEADER FILE NUMBER: 11 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 7 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9342.0 CNP 9335.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9425.0 9418.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 26-SEP-95 ISC 2.11 CIM 3.94 MEMORY 9700.0 9342.0 9460.0 0 29.4 32.0 TOOL NUMBER P0409CRNG6 P0409CRNG6 8.500 3641.0 LSND 9.90 47.0 9.3 700 14.2 .000 .000 .000 .000 .0 181.0 .0 .0 SANDSTONE .00 .000 TOOL STANDOFF (IN) : . 0 EWR FREQUENCY (HZ) : REMARKS: MAD RUN 7. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-39 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 FCNT MWD 68 1 CPS 4 4 NCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 890 01 1 4 90 334 31 1 4 90 334 30 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9465.000000 Tape File End Depth = 9330.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 70925 datums Tape Subfile: 12 73 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 13 is type: LIS 96/ 1/25 01 **** REEL TRAILER **** 96/ 1/29 01 Tape Subfile: 13 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 29 JAN 96 10:05a Elapsed execution time = 2.75 seconds. SYSTEM RETURN CODE = 0