Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-108XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: ~Dianna Vincent Nathan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~ RECEIVED STATE OF ALASKA JAN 2 3 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND L060GCC j la. Well Status: 0 Oil 0 Gas 0 SPLUG 0 Other ,®Abandoned 0 Suspended 1 b. Well Class 20AAC 25.105 20AAC 25.»0 0 Exploratory 0 Stratigraphic 1 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions Zero ,, IS Development ❑Service 2. Operator Name: 5. Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. • 12/31/2013 195-108 313-488 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 7/29/1995 50-029-22578-00-00 • 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 8/13/1995 MPF-53 ' 1 2028' FSL,2572' FEL, Sec.06,T13N, R10E, UM 8. KB(ft above MSL): 46 15.Field/Pool(s) Top of Productive Horizon: Milne Point Unit/Kuparuk River 84'FSL,2453' FEL, Sec. 30,T14N, R10E, UM GL(ft above MSL): 13.4' , P Total Depth: 9.Plug Back Depth(MD+TVD) Oil 328'FSL,2485' FEL, Sec.30,T14N, R10E, UM 11982' 7050' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 541990 y- 6035481 Zone- ASP4 12425' 7429' • ADL 025509&355018 ' TPI: x- 542027 y- 6044096 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 541993 Y- 6044340 Zone- ASP4 None 18. Directional Surve : 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): Y ❑Yes ®No N/A ft MSL 1800'(Approx.) (Submit electronic and printed information per 20 AAC 25.050) ( PP ) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: Gyro, MWD, LWD, GR/CCL/DEN N/A 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20' 91.1# NT8OLHE 32' 110' 32' 110' 30" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 35' 6750' 35' 4408' 12-1/4" 1292 sx PF'E', 250 sx Class'G', 124 sx PF'E'. 7" 26# L-80 33' 12398' 33' 7405' 8-1/2" 234 sx Class'G' 24. Open to production or injection? 0 Yes ®No 25. TUBING RECORD If Yes, list each interval o en SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) 4-1/2", 12.6#, L-80 Work 11800' 11667'/6790' String 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes IS No scANNED APR 2 8 2014, DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 11982' Set Whipstock 11982' 30 Bbls Class'G' 27. PRODUCTION TEST Date First Production _ Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes IS No If Yes to either question,list formations and intervals cored(MD+ND of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. . None RB E MAR 21 2,, Form 10-407 Revised 10/2012 lar 4123111- I23 /f CONTINUED CV RE ERSE --?lis,b '-`1 Hi Ill Submit Original Only 29. GEOLOGIC MARKERS(List all formations a arkers encounter 30. FORMATION TESTS NAME MD TVD Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Kuparuk C 11945' 7019' None Kuparuk B 11951' 7024' Kuparuk A3 12007' 7071' Kuparuk A2 12022' 7083' Kuparuk Al 12054' 7110' Formation at Total Depth: 31.List of Attachment Summary of Pre-Rig Work, Summary of Daily Drilling Reports,Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Matt Ross,564- 82 Email: Rossmo@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: ��� Phone 564-4091 Date: 1/ 3/1141-- INSTRUCTIONS j3111INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only North America-ALASKA-BP Page 1 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 I End Date:11/8/2013 X3-0146L-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM 1 Rig Release:11/8/2013 Rig Contractor.DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.©45.90usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/26/2013 03:00 - 06:00 3.00 MOB P PRE PREPARE TO MOVE RIG OFF DS 04-37 TO PAD10. 06:00 - 07:00 1.00 MOB P PRE PJSM,MOVE RIG. -MOVE OFF DS 4-37 WSL PRESENT. -REMOVE MATS FROM CELLAR. -JOCKEY RIG 180 DEG TO LINE UP ON ROAD. 07:00 - 08:30 1.50 MOB P PRE MOVE RIG ON MATS AROUND RESERVE PIT TO SOUTH END OF DRILL SITE 4. 08:30 - 09:30 1.00 MOB P PRE PJSM,REMOVE BOP STACK FROM CELLAR AND PLACE ON STAND. -PJSM RIG MOVE. 09:30 - 12:00 2.50 MOB P PRE MOVE OFF DRILL SITE 4 -TRAVEL ON RIG MATS TO HOT WATER PLANT INTERSECTION. -STAGE AT MCC WHILE DOYON 14 MOVES AHEAD TO PAD 10 12:00 - 21:00 9.00 MOB N WAIT, PRE WAIT ON DOYON 14 TO MOVE TO PAD 10. 21:00 - 23:30 . 2.50 MOB P PRE BEGIN MOVE RIG ON MATS FROM MCC TO PAD 10. 23:30 - 00:00 0.50 MOB _ N WAIT PRE STAGED AT PAD 10,WAIT ON BOOSTER .FROM DOYON 14. 10/27/2013 00:00 - 08:00 8.00 MOB - N WAIT PRE 1SPCC CHECKS AND PRE-TOUR MEETING. WEEKLY SAFETY MEETING WITH C CREW. -CHAGE OUT ANNULAR WHILE WAITING ON DOYON 14 AT PAD 10. 08:00 - 20:00 1200 MOB N WAIT PRE WAIT AT PAD 10 ON DOYON 14 FOR BOOSTERS. 20:00 - 22:00 2.00 MOB N WAIT PRE INSTALL BOOSTERS. 22:00 - 00:00 2.00 MOB P PRE MOVE RIG FROM PAD 10 TOWARDS MPF-53. WEEKLY SAFETY MEETING WITH D CREW. 10/28/2013 00:00 - 00:00 24.00 MOB P PRE SPCC CHECKS AND PRE-TOUR MEETING. MOVE RIG FROM PAD 10 TOWARD MPF-53. -09:00 HRS.TURN ONTO'K'PAD RD. -12:00 HRS.CLOSE TO E-PAD. -WSL ATTEND RIG MOVE PJSM. -16:30 HRS.STAGE ON SANTA FE PAD AND LET C -20:00FIELD HRS.HEADINGHANGEOUT.TOWARDS M PAD. 1 -23:30 HRS.ATM PAD FOR CREW CHANGE. -WSLS ATTEND RIG MOVE PJSM. Printed 11/18/2013 10:21:30AM North America-ALASKA-BP Page 2 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 'X3-0146L-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.©45.90usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/29/2013 00:00 - 00:00 24.00 MOB P PRE SPCC CHECKS AND PRE-TOUR MEETING. MOVE RIG FROM M PAD TOWARD MPF-53. -05:00-05:30 HRS. MOVE ACROSS KUPARUK EAST CHANNEL BRIDGE. -05:30-08:00 HRS. LET TRAFFIC PASS. -08:00-12:00 HRS. MOVE ACROSS CENTRAL AND WEST CHANNEL BRIDGES.LET TRAFFIC PASS AT MOBIL PAD. -12:00-14:30 HRS STOP AT W-PAD RD., PERFORM CREW CHANGE,WSLAND DDI HSE REP. ATTEND PJSM. -REPLACE HI-PRESSURE HOSE ON JACK-STEER PUMP.(HOSE TO FITTING IN QUESTIONABLE CONDITION) -TROUBLESHOOT JOY STICK THROTTLE. -BACK UP RIG AND LET TRAFFIC PASS. -14:30-16:30 HRS.MOVE TO Z-PAD RD AND LET TRAFFIC PASS. -16:30-19:30 HRS.MOVE TO LAND V ROAD, BACK UP LET TRAFFIC PASS. -19:30-22:00 HRS.MOVE RIG TO MILNE POINT/SPINE RD INTERSECTION. -22:00-24:00 HRS.LET TRAFFIC PASS,WAIT ON RIG MATS AND CREW CHANGE OUT. WSL ATTEND RIG MOVE PJSM. 10/30/2013 00:00 - 10:30 10.50 MOB P PRE SPCC CHECKS AND PRE-TOUR MEETING. RIG: MOVE FROM MILNE SECURITY TOWARD MPF-53. -00:00-03:30 HRS.MOVE RIG MATS WHILE AT MILNE POINT/SPINE RD INTERSECTION. -03:30-10:30 HRS.MOVE RIG FROM MILNE POINT/SPINE RD INTERSECTION TO TEXACO PAD. 10:30 - 18:30 8.00 MOB N WAIT PRE RIG: WAIT AT TEXACO PAD WHILE MATS ARE MOVED PASSED RIG,FROM THE FIELD STAGING AREA TO MPF-PAD. -12:00 HRS.WSL ATTEND PJSM AT CREW CHANGE. -18:30 HRS.CLEAR TO MOVE. CAMP: -16:00 HRS.LOAD DOYON 16 CAMP ON TRUCKS. -16:30 HRS.WAIT ON SECURITY TO MOVE CAMP. 18:30 - 00:00 5.50 MOB P PRE RIG: MOVE RIG FROM TEXACO PAD TO L&F ACCESS ROAD. -23:30 HRS.AT L&F ACCESS ROAD. CAMP: -19:00 HRS.MOVE CAMP FROM SURFCOTE PAD TOWARD TEXACO. Printed 11/18/2013 10.21•30AM North America-ALASKA-BP Page 3 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date: 10/26/2013 End Date:11/8/2013 X3-0146L-C:(1,500,000.00) 1 Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.@45.90usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/31/2013 00:00 - 02:30 2.50 MOB P PRE SPCC CHECKS AND PRE-TOUR MEETING. -WSLS IN ATTENDANCE. RIG: MOVE RIG FROM MPU L&F ACCESS ROAD TO MPL-PAD. -02:30 HRS.RIG STAGED AT MPL-PAD. CAMP: MOVE FROM MILNE POINT/SPINE RD INTERSECTION TOWARD TEXACO PAD. -02:00 HRS.CAMP AT TEXACO PAD. 02:30 - 05:30 3.00 MOB N WAIT PRE WAIT ON MATS TO BE PLACED ON MPF-PAD RD.(-700 MATS) MOVE RIG FROM MPL-PAD TOWARD MPF-PAD. 05:30 - 07:30 2.00 MOB P . PRE MOVE RIG ON MATS FROM MPL-PAD TO MPF-PAD. 07:30 - 12:00 4.50 MOB P PRE MOVE LOADS FROM DRILL SITE 4 TO i MPF-PAD. R/U CAMP UNITS AREA. .-PICK UP MATS FROM MPF-PAD RD. -REMOVE BOOSTER WHEELS FROM RIG. -INSTALL BOP STACK ON CELLAR STUMP. 12:00 - 15:30 3.5'0 MOB ' P PRE PJSM,REVIEW S.O.P.ON RAISE MAST. -PERFORM CHECK LIST. -TOOL PUSHER AND WSL INSPECT DERRICK RIGGING. -RAISE MAST. -BRIDLE DOWN. _ -R/U FLOOR. 15:30 - 20:00 4.50 MOB P PRE PJSM,LAY MATS AND SPOT RIG -MOVE RIG DOWN PAD. -LAY MATS AROUND WELL. -SPOT WELL HEAD EQUIPMENT,KILL MANIFOLD AND HOSES IN CELLAR. -BACK OVER MPF-53.WHP 1100 PSI PRIOR TO BACKING RIG OVER WELL. -WSL/TOOLPUSHER PRESENT. -PAD OPERATOR NOTIFIED. -SECURE RIG STAIRS AND CELLAR DOORS. 24 HRS NOTICE OF UP COMING BOPE TEST E-MAILED TO AOGCC.17:00 HRS 10/31/2013 20:00 - 00:00 4.00 RIGU P DECOMP ACCEPT RIG ON MPF-53 AT 20:00 HRS 10/31/13 -SPOT CREW TRAILER. -R/U LINES TO KILL MANIFOLD IN CELLAR. -SPOT FUEL TANK AND SLOP TANK -HYRDO TEST ALL PITS. 11/1/2013 00:00 01:30 1.50 RIGU P DECOMP SPCC CHECKS AND PRE-TOUR MEETING. -WSLS IN ATTENDANCE. HYDRO TEST PITS. -R/U HARD LINE TO FLOW BACK TANK -BLOW FLOW BACK TANK WITH VAC TRUCK Printed 11/18/2013 10:21:30AM • North America-ALASKA-BP Page 4 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 X3-0146L-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.@45.90usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 04:00 2.50 WHSUR P DECOMP PJSM,SURFACE TEST LINES. -TEST TO 250/3500 PSI FOR 5 CHARTED MIN.EACH. BLOW DOWN LINES. 04:00 - 04:30 0.50 RIGU P DECOMP CONDUCT GAS RIG EVACUATION DRILL. -ALL PERSONNEL GATHERED AT MUSTER AREA. -SCS ACCOUNTED FOR ALL PERSONNEL ON THE PAD. AAR: WSL TALKED WITH 3RD PARTY HANDS AND ASKED IF THEY HEARD EVACUATION SIREN LOUD AND CLEAR.THEY WERE MONITORING 'HUB AND COULD HEAR SIREN FROM RIG. ASKED CREW HOW TO DETERMINE MUSTER AREA.LOOK FOR WIND SOCKS. -WHO IS TRAINED AND WHO IS ALLOWED TO HIT THE ESD. -DISCUSSED STABBING SAFETY VALVE IN A REAL SITUATION. 04:30 - 06:30 2.00 WHSUR P DECOMP CLEAN AND INSPECT RIG FOR ATP. 06:30 - 09:00 2.50 WHSUR P DECOMP PJSM,PULL BPV. R/U WELL SUPPORT LUBRICATOR. -PRESSURE TEST 250/3500 PSI F/5 CHARTED MIN W/DIESEL. -PULL TYPE'H'BPV. -980 PSI ON TBG,IA/1050 PSI,OA/'0'0 PSI. R/D LUBRICATOR. 09:00 - 10:00 1.00 WHSUR P DECOMP HELD MILNE POINT'ATP'MEETING AT RIG. -MPU WTL,WSL'S,HSE AND EVIRO REP.AND MORE. -DDI HSE AND RWO SUPT. -ADW RWO AND BP/DDI,RWO/DRILLING SUPT. 10:00 - 00:00 14.00 RIGU P DECOMP INSTALL CONTROL BOX ON RIG FLOOR ESP 'PULL-OVER'WINCH. SATISFY CRITERIA IN IR-4388531. -INSTALL HYDRAULIC HOSES AND VALVES. -HOOK UP ESP CAMERA SYSTEM FROM RIG FLOOR TO SPOOLING UNIT. -INSTALL 24 VT REMOTE CONTROL BOX.IN SPOOLING UNIT. -WORK ON S.O.P.FOR NEW'PULL-OVER' WINCHES. TUBOSCOPE PERFORM MPI ON WINCH MOUNTS. -R/U LINES TO TREE,PRESSURE TEST CONNECTIONS TO 250/3500 PSI FOR 5 CHARTED MINUTES EACH. -TEST REMOTE CONTROLLERS FOR WINCHES. Printed 11/18/2013 10:21:30AM • North America-ALASKA-BP Page 5 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 X3-0146L-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.@45.90usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/2/2013 00:00 - 06:30 6.50 RIGU P DECOMP SPCC CHECKS AND PRE-TOUR MEETING. -WSLS IN ATTENDANCE. LOAD PIPE INTO PIPE SHED:98 JTS 4-1/2" TUBING,220 JTS DP. CONTINUE TO R/U WINCH ON RIG FLOOR. -CONTINUE TO DEVELOP S.O.P.FOR 'PULL-OVER'WINCHES. WAIT ON DAY WSL KILL. 06:30 - 07:00 0.50 RIGU P DECOMP HELD PRE-SPUD MEETING WITH RWO ODE ON MPF-53. -CONFERENCE CALL WITH ODE,WSL AND TOOL PUSHER. -DISCUSSED WELL PLAN AND WELL KILL. 07:00 - 08:00 1.00 KILLW P DECOMP WSL AND TOOL PUSHER INSPECT R/U OF KILL MANIFOLD AND HARD LINE. -DISCUSS CIRCULATION KILL PLAN WITH MUD ENGINEER AND PIT CREW. 08:00 - 13:30 5.50 KILLW P DECOMP PJSM,WELL KILL. -REVIEW DDI WELL KILL S.O.P. -BRIDGING DOCUMENT. -DISCUSSED INDIVIDUAL ROLLS AND RESPONSIBILITIES. -DWSL AND TOOL PUSHER PRESENT FOR OPERATION. SITP=900 PSI, SICP=1050 PSI, OA='0'PSI. KWF=8.5 PPG HEATED 120 DEG.SEAWATER. -WSL/TOOL PUSHER VERIFY VALVE ALIGNMENT. -BLEED GAS FROM THE IA.F/1050 PSI TO 150 PSI IN 35 MIN.SITP=900 PSI. -NO FLUID RETURNS. PUMP 70 BBLS KWF DOWN THE TBG UP THE IA THROUGH THE CHOKE TO THE FLOW BACK TANK. -ICP=3 BPM/550 PSI -FCP=3BPM/525 PSI. FLUID RETURNS TO SURFACE AFTER 50 BBLS PUMPED.WITH 5 BBLS CRUDE RECORDED. -BULL HEAD ON THE FLY:30 BBLS KWF,3 BPM/680 PSI. PUMP 527 BBLS KWF DOWN THE TBG UP THE IA THROUGH THE CHOKE TO THE FLOW BACK TANK. -ICP=4 BPM/525 PSI -FCP=5 BPM/1410 PSI -OBSERVED-30 BBLS CRUDE AND OVER 95%FORMATION WATER IN RETURNS. -LOST 245 BBLS KWF TO THE FORMATION. MONITOR WELL FOR 30 MIN.TBG AND IA ON A VACUUM IN 15 MINUTES. WELL KILL:837 BBLS IN,563 BBLS OUT,LOSS 245 BBLS. Printed 11/18/2013 10:21:30AM North America-ALASKA-BP Page 6 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 X3-0146L-C:(1,500,000.00) Project Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.©45.90usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 17:30 4.00 WHSUR P DECOMP PJSM,INSTALL AND TEST TWC -M/U DSM LUBRICATOR AND TEST T/250/ 3500 PSI F/5 CHARTED MIN. -INSTALL 2-1/2"TYPE'H'TWC. -PUMP 22 BBLS TO CATCH FLUID. -PERFORM ROLLING TEST, 4.5 BPM/500 PSI F/BELOW FOR 10 CHARTED MIN. PUMPED 76 BBLS. -TEST F/ABOVE 250/3500 PSI F/5 CHARTED MIN. 17:30 - 21:00 3.50 WHSUR P DECOMP BLOW DOWN,R/D CIRCULATION LINE AND KILL MANIFOLD IN CELLAR. -R/U SECONDARY KILL LINE AND START FILLING IA AT 20 BPH. -FMC BLEED ADAPTER VOID. -N/D TREE AND CLEAN HANGER. 21:00 - 00:00 3.00 BOPSUR P DECOMP N/U 13-5/8"BOPE. -INSTALL RISER,TURN BUCKLES AND BELL NIPPLE. -PLACE MOUSE HOLE. -ENERGIZE KOOMEY. -GREASE CHOKE/MUD CROSS. 11/3/2013 00:00 - 03:00 4.00 BOPSUR P DECOMP SPCC CHECKS AND PRE-TOUR MEETING. -WSLS IN ATTENDANCE. CONTINUE TO N/U 13-5/8"BOPE. -FUNCTION TEST ALL RAMS. -FUNCTION AND FLEX NEWANNULAR BEFORE TEST. -M/U TEST JOINTS AND FLOOR VALVES FOR TEST. -R/U TEST EQUIPMENT. -FILL STACK AND CHOKE MANIFOLD. 03:00 - 06:30 3.50 BOPSUR P DECOMP PJSM TO TEST FOUR PREVENTER BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -COULD NOT GET A PASSING BODY TEST WITH 2-7/8"TEST JT.DUE TO NEWANNULAR ISSUES. -REPLACE 2-7/8"TEST JOINT WITH 4-1/2" TEST JT.RETRY BODY TEST.LEAK ON MUD CROSS FOUND.GOOD BODY TEST AFTER LEAK FIXED. AOGCC JOHN CRISP WAIVED WITNESS OF BOPE TEST BY EMAIL,11/02/2013 19:30. 06:30 - 07:00 0.50 BOPSUR P DECOMP NOTIFY SUPERINTENDENTS AND DISCUSS ISSUE WITH NEWT-3 ANNULAR. -START THE BOPE TEST AND FORMULATE A PLAN TO INSPECT/REPLACE ANNULAR ELEMENT. Printed 11/18/2013 10:21:30AM North America ALASKA r " Operation Summary Report {' Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 X3-0146L-C:(1,500,000.00) Project:Milne I4oint Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. UWI 500292257800 Active datum:Gyrodata Ref.Elev.@45.90usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 13:00 6.00 BOPSUR P DECOMP TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS AND DOYON PROCEDURES. -TEST UPPER 2-7/8"X 5"VARIABLE RAMS WITH 2-7/8"AND 4-1/2"TEST JOINT,250 PSI, 3500 PSI,5 MIN,CHARTED. TEST LOWER 2-7/8"X 5"VARIABLE RAMS WITH 2-7/8"AND 4-1/2"TEST JOINT,250 PSI, 3500 PSI,5 MIN,CHARTED. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3500 PSI,5 MIN,CHARTED. -TEST WITH FRESH WATER. -MAINTAIN CONTINUOUS HOLE FILL TO THE IA DURING TEST @-20 BPH,8.5 PPG SEAWATER. ' I WEEKLY SAFETY MEETING WITH DAY CREW. -WSL IN ATTENDANCE. 13:00 - 13:30 0.50 BOPSUR P DECOMP R/D BOPE TEST EQUIP. -BLOW DOWN SURFACE LINES. 13:30 - 21:30 8.00 BOPSUR N DECOMP PJSM,INSPECT AND REMOVE T-3 ANNULAR PREVENTOR. -CLOSE BLIND RAMS. -LO/TO KOOMEY SYSTEM. -N/D RISER AND DUTCH SYSTEM. -DRAIN OIL FROM VOID. -REMOVE ANNULAR CAP AND ELEMENT. -DOYON SUPERINTENDENT INSPECT. -INSTALL NEW HYDRIL ANNULAR ELEMENT. 21:30 - 22:00 0.50 BOPSUR P DECOMP TEST ANNULAR WITH 2-7/8"AND 4-1/2"TEST JOINT,250 PSI,3500 PSI,5 MIN,CHARTED. _ 22:00 - 00:00 2.00 BOPSUR P DECOMP INSTALL BELL NIPPLE,RISER AND MOUSE HOLE. -P/U AND R/U OFF SET LUBRICATOR EXTENSION TO PULL TWC. 11/4/2013 00:00 - 04:00 4.00 WHSUR P DECOMP SPCC CHECKS,WEEKLY SAFETY MEETING AND PRE-TOUR MEETING. -WSLS IN ATTENDANCE. PJSM,R/U WELL SUPPORT LUBRICATOR AND 1 TOOLS TO PULL TWC. -PRESSURE TEST LUBRICATOR,250 PSI, 3500 PSI,5 MIN,CHARTED. -PULL TWC. -VERIFY TUBING ON A VAC. -R/D AND UD LUBRICATOR AND TOOLS. 04:00 - 05:00 1.00 PULL P DECOMP PJSM,PULL HANGER TO RIG FLOOR AND BULLHEAD. -M/U LANDING JOINT WITH TIW VALVE TO HANGER. -WSL VERIFY NO PRESSURE UNDER HANGER,WELL IS TAKING FLUID. -FMC REP BACK OUT LOCK DOWN SCREWS. -PULL HANGER TO RIG FLOOR. -PU WT=125 KLBS. Printed 11/18/2013 10'21:30AM North America-ALASKA-BP Page 8 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 X3-0146L-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 1 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. UW:500292257800 Active datum:Gyrodata Ref.Elev.@45.90usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth ' Phase Description of Operations (hr) (usft) 05:00 - 06:00 1.00 PULL P DECOMP BULLHEAD 70 BBLS OF KWF DOWN TUBING. -3 BPM/970 PSI TBG AND IA ON A VACUUM. -WSL/DRILLER VERIFY NO TRAPPED PRESSURE,OPEN ANNULAR. 06:00 - 06:30 0.50 PULL P DECOMP BREAK OUT AND UD TBG HANGER. UD LANDING JOINT. 06:30 - 07:30 1.00 PULL P DECOMP PJSM,R/U ESP CABLE SHEAVE. -MAN RIDER PERMIT. -HANG SHEAVE AND INSTALL CABLE TRUNK 07:30 - 08:00 0.50 PULL P DECOMP PJSM WITH CENTRILIFT -DISCUSS HAZARDS WORKING WITH NEW TOOLS, -USED TO SECURE/PULL ESP CABLE OVER SHEAVE IN DERRICK -DISCUSS WELL CONTROL. 08:00 - 08:30 0.50 PULL P DECOMP M/U ESP CABLE LIFT DEVISE. -CENTRILIFT REP PREP THREE LEAD AND ATTACH,TO GRABBERS. -LIFT DEVISE. -AND CRIMP THE GRABBERS. 08:30 - 10:00 1.50 PULL P DECOMP PULL ESP CABLE OVER SHEAVE IN DERRICK -TOOLPUSHER ON RIG FLOOR WITH WSL AND RIG MECHANIC IN SPOOLING UNIT. -POH,STAND BACK ONE STAND WITH CABLE ON THE RIG FLOOR. -USE NEW'PULL-OVER'WINCH IN SPOOLING UNIT TO PULL ESP CABLE OVER SHEAVE TO THE UNIT. -ATTACH ESP TO REEL. SECURE FOSV. 10:00 - 10:30 0.50 PULL • P DECOMP AAR:REVIEW NEW S.O.P. -ALL PRESENT TO REVIEW STEP BY STEP AND EDIT CHANGES TO THE NEW S.O.P. -SAFETY JOINT MADE UP ON SKATE. -PULL TEST TO STALL POINT. PRIOR TO PULL OVER SHEAVE. -PELICAN HOOK TO REPLACE 4-PART SHACKLE OVER HEAD. -USE REMOTE CONTROL BELLY BELT,SO ONE HAND IS FREE TO OPERATE 2-WAY-RADIO. 10:30 - 12:00 1.50 PULL P DECOMP PULL 2-7/8"ESP COMPLETION. -POH F/11539'T/10327'MD -2-7/8"L-80,8RD,EUE,6.5#TBG. -STAND IN DERRICK -MAINTAIN CONTINUOUS HOLE FEED AT 20 BPH W/8.5#SEAWATER.. 12:00 - 12:30 0.50 PULL P DECOMP PJSM,PERFORM PRE-TOUR CHECKS -SERVICE RIG FLOOR EQUIPMENT. 12:30 - 15:00 2.50 PULL P DECOMP PULL 2-7/8"ESP COMPLETION. -POH F/10327'T/6839'MD. -2-7/8"L-80,8RD,EUE,6.5#TBG. -53 STANDS IN DERRICK PUW/87K,SOW/84K. Printed 11/18/2013 10:21:30AM North America-ALASKA-BP Page 9 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 X3-0146E-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12 00:00AM Rig Release:11/8/2013 Rig Contractor.DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.@45.90usft(above Mean Sea Level) 1[t Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (u ) 15:00 - 00:00 9.00 PULL P DECOMP PULL 2-7/8"ESP COMPLETION. -POH F/6839'T/484'MD. -UD TBG 1X1 TO PIPE SHED. -KICK WHILE TRIPPING ESP DRILL. -OA=0 PSI -24 HOUR FLUID LOSS=594 BBLS 8.5 SEAWATER 11/5/2013 00:00 - 00:30 0.50 PULL P DECOMP SPCC CHECKS AND PRE-TOUR MEETING. -SERVICE AND INSPECT TOP DRIVE AND SKATE. -MAINTAIN CONTINUOUS HOLE FEED=20 BPH 8.5 SEAWATER KWF 00:30 - 01:00 0.50 PULL P DECOMP CONTINUE PULL 2-7/8"ESP COMPLETION. POH F/484'TO ESP ASSY 01:00 - 04:00 3.00 PULL P DECOMP PJSM,PULL AND UD ESP ASSEMBLY LID MOTORS AND PUMPS CLEAR RIG FLOOR OF CENTRILIFT EQUIPMENT -MOTOR FOUND TO BE BAD AFTER INSPECTION ALL CLAMPS RECOVERED,192 LASALLE,7 PROTECTOLIZERS,3 ARMSTER GUARD,2 BUSTER CLAMPS 04:00 - 05:00 1.00 PULL P DECOMP PJSM,R/D ESP SHEAVE AND TRUNK -R/D SPOOLING UNIT EQUIP AND SECURE ESP CABLE 05:00 - 05:30 0.50 WHSURP DECOMP M/U WEAR BUSHING INSTALLATION TOOL -INSTALL 1/16"ID WEAR BUSHING 05:30 - 09:00 3.50 EVAL P DECOMP PJSM,P/U RIH WITH CHAMP PACKER. -M/U 7"HES,CHAMP TEST PACKER. -RIH ON 2-7/8"EUE TBG FROM DERRICK. -T/5074'MD. -PUW/61K,SOW/58K. SPCC CHECKS AND PRE-TOUR MEETING. -SERVICE AND INSPECT TOP DRIVE AND SKATE. 09:00 - 12:00 3.00 EVAL P DECOMP PJSM,P/U 4"DP FROM PIPE SHED -RIH W/7"CHAMP PACKER ON TAPERED STRING. -P/U DP 1X1 FROM PIPE SHED. -F/5074'T/7001' 12:00 - 12:30 0.50 EVAL P DECOMP SPCC CHECKS AND PRE-TOUR MEETING. -SERVICE AND INSPECT TOP DRIVE AND SKATE. 12:30 - 19:30 7.00 EVAL P DECOMP CONTINUE TO RIH WITH DP 1X1 -F/7001'T/11772'MD 19:30 - 21:00 1.50 EVAL P DECOMP PJSM FOR CUT AND SLIP DRILLING LINE -CUT AND SLIP 60'DRILLING LINE -INSPECT AND SERVICE INSIDE DRAW 'WORKS 21:00 - 22:30 1.50 EVAL P DECOMP SET HES CHAMP PACKER AT 11780'MD COE -FILL HOLE,CLOSE RAMS -MIT-IA 7"26#L-80 CASING -250 PSI,5 MIN,3000 PSI 30 MIN,CHARTED, GOOD TEST -OA=0 PSI DURING TEST -NOTIFY AND RECEIVE AUTHORIZATION TO PROCEED FROM WTL Printed 11/18/2013 10:21:30AM North America-ALASKA-BP Page 10 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 X3-0146L-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:OOAM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.@45.90usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 22:30 - 23:00 0.50 EVAL P DECOMP BLEED OFF PRESSURE,OPEN RAMS -UNSEAT PACKER -WELL IS ONAVAC -BLOW DOWN ALL LINES,R/D TEST EQUIPMENT R/U TO LDDP 2300 - 00 00 1.00 EVAL P DECOMP PJSM FOR POOH AND LDDP -LDDP 1X1 F/11760'TO 10825' -MAINTAIN CONTINUOUS HOLE FEED=20 BPH 8.5 SEAWATER KWF -OA=0PSI -24 HOUR FLUID LOSS=516 BBLS 8.5 SEA WATER 11/6/2013 00:00 - 00:30 0.50 EVAL P DECOMP SPCC CHECKS AND PRE-TOUR MEETING. -SERVICE AND INSPECT TOP DRIVE AND SKATE. -MAINTAIN CONTINUOUS HOLE FEED=20 BPH 8.5 SEAWATER KWF 00:30 - 07:30 7.00 EVAL P DECOMP PJSM,CONTINUE POOH AND LDDP 1X1 -F/10825'T/5074'MD 07:30 - 12:00 4.50 EVAL P DECOMP R/U POWER TONGS AND TUBING ELEVATORS L/D 2 7/8"TUBING F/5074'T/812'MD 12:00 - 12:30 0.50 EVAL P DECOMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -SERVICE AND INSPECT TOP DRIVE AND PIPE SKATE 12:30 - 13:30 1.00 EVAL P DECOMP L/D 2 7/8"TUBING F/812'TO SURFACE L/D HES CHAMP PACKER 13:30 - 14:00 0.50 EVAL P DECOMP CLEAR/CLEAN RIG FLOOR -PULL WEAR RING 14:00 - 00:00 10.00 RUNCOM P RUNCMP PJSM,LOAD PIPE SHED WITH 4 1/2:TUBING -REMOVE PROTECTORS,RABBIT AND STRAP -11800'OF 4 1/2"TUBING -SEND FINALIZED COMPLETION TALLY TO ODE AND RECEIVE APPROVAL TO RUN TUBING 11/7/2013 00:00 - 00:30 0.50 RUNCOM P RUNCMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -SERVICE AND INSPECT TOP DRIVE AND PIPE SKATE 00:30 - 12:00 11.50 RUNCOM P RUNCMP PJSM FOR RUNNING 4 1/2"COMPLETION ASSY -M/U 7"X 4 1/2"HES TNT PERMANENT PACKER AND TAIL PIPE ASSY PER HALLIBURTON REP -RUN 4 1/2"12.6#IBT-M TUBING COMPLETION STRING -BAKER LOC CONNECTIONS UNDER PACKER,USE BEST-O-LIFE 2000 ON ALL OTHER CONNECTIONS,TORQUE PIPE TO MAKE UP STAMP -RIH TO 6609'MD -PUWT=100K,SO\ =83K -MAINTAIN CONTINUOUS HOLE FEED=20 BPH 8.5 SEAWATER KWF Printed 11/18/2013 10:21:30AM North America-ALASKA-BP Page 11 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date. 10/26/2013 End Date.11/8/2013 X3-0146E-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292257800 Active datum:Gyrodata Ref.Elev.@45.90usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 RUNCOM P RUNCMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -SERVICE AND INSPECT DRAW WORKS AND PIPE SKATE 12:30 - 21:00 8.50 RUNCOM P RUNCMP RUN 4 1/2"12.6#IBT-M TUBING COMPLETION STRING -FROM 6609'TO 11778'MD 21:00 - 22:00 1.00 RUNCOM P RUNCMP MAKE UP HANGER AND LANDING JOINT WITH FOSV -LAND HANGER IN WELL HEAD,WLEG AT 11800.14' -FMC REP,RUN IN LOCK DOWN SCREWS 22:00 - 23:30 1.50 RUNCOM P RUNCMP PJSM TO REVERSE CIRCULATE -PUMP 240 BBLS 120 DEGREE CORROSION INHIBITED SEA WATER DOWN IA,TAKING RETURNS UP TUBING -4BPM=450 PSI,38 BBLS TO FILL PIPE PUMP DOWN TUBING TO ENSURE BALL SEAT IS CLEAR 23:30 - 00:00 0.50 RUNCOM P RUNCMP M/U LANDING JOINT TO HANGER -DROP 1 7/8"OD BALL AND ROD,TO SEAT -OA=0PSI '-24 HOUR FLUID LOSS=491 BBLS 8.5 SEA WATER 11/8/2013 00:00 - 01:30 1.50 RUNCOM P RUNCMP PJSM TO SET AND TEST PACKER -PRESSURE UP ON 4 1/2"TUBING TO SET PACKER -250 PSI,5 MIN,3000 PSI,30 MIN,CHARTED, OBSERVE PACKER SET AT 1900 PSI -BLEED PRESSURE OFF TO 1500 PSI AND SHUT IN 1-PRESSURE UP ON IA,MIT-IA -250 PSI,5 MIN,3000 PSI,30 MIN,CHARTED -NOTIFY AND RECEIVE AUTHORIZATION TO PROCEED FROM WTL -BLEED OFF TUBING TO SHEAR DCK VALVE -PUMP DOWN TUBING 2 BPM=640 PSI, •RETURNS TO PITS -PUMP DOWN IA,2 BPM=720 PSI,RETURNS TO PITS,DCK IS OPEN 01:30 - 02:00 0.50 WHSUR P RUNCMP SUCK OUT BOP STACK -FMC REP INSTALL TWC 02:00 - 03:00 1.00 WHSUR P I RUNCMP TEST TWC FROM BELOW,250 PSI,5 MIN, 2500 PSI,10 MIN,CHARTED -TEST TWC FROM ABOVE,250 PSI,5 MIN, 3000 PSI,10 MIN,CHARTED 03:00 - 03:30 0.50 WHSUR P RUNCMP RIG DOWN ALL TEST LINES AND EQUIPMENT -BLOW DOWN ALL LINES,CHOKE AND KILL LINES,AND CHOKE MANIFOLD 03:30 - 04:30 1.00 WHSUR P RUNCMP PJSM,N/D BOPE AND STAND BACK ON PEDESTAL 04:30 - 08:00 3.50 WHSUR P RUNCMP PJSM FOR N/U ADAPTOR FLANGE AND TREE -TAIL IN ADAPTER FLANGE AND TREE FROM BEHIND RIG -N/U ADAPTER FLANGE PER FMC REP AND TEST SAME. 08:00 - 09:30 1.50 WHSUR P RUNCMP GOOD TEST ON ADAPTER FLANGE. PJSM THEN INSTALL 4-1/16"5K TREE. Printed 11/18/2013 10:21:30AM North America-ALASKA-BP Page 12 of 12 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:WORKOVER(WO) Start Date:10/26/2013 End Date:11/8/2013 X3-0146L-C:(1,500,000.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:DOYON 16 Spud Date/Time:7/29/1995 12:00:00AM Rig Release:11/8/2013 Rig Contractor:DOYON DRILLING INC. l UWI:500292257800 Active datum:Gyrodata Ref.Elev.©45.90usft(above Mean Sea Level) Date From-To Hrs Task - Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 10:30 1.00 WHSUR P RUNCMP PRESSURE TEST TREE TO 5KPSI,GOOD. 10:30 - 13:00 2.50 WHSUR P. RUNCMP RIG UP LUBRICATOR AND PRESSURE TEST TO 250/3500 PSI,GOOD. PULL TWC. 13:00 - 15:30 2.50 WHSUR P RUNCMP RIG UP LRS. PJSM THEN LRS PRESSURE TEST LINES, PUMP 85 BBLS FREEZE PROTECT INTO THE IA,TAKING RETURNS FROM TUBING. FREEZE PROTECT TO 2633 FT MD,2500 FT TVD. 15:30 - 16:30 1.00 WHSUR P RUNCMP ALLOW DIESEL TO U-TUBE FOR 1 HOUR. 16:30 - 18:30 2.00 WHSUR P RUNCMP PJSM,R/U DSM LUBRICATOR,TEST 250 PSI, 3500 PSI,5 MIN,CHARTED -INSTALL BPV,R/D LUBRICATOR 18:30 - 18:30 0.00 WHSUR P RUNCMP LRS,TEST BPV FROM BELOW -250 PSI,2500 PSI,10 MIN,CHARTED 18:30 - 20:00 1.50 WHSUR P RUNCMP BLOW DOWN ALL CIRCULATING AND TEST LINES -R/D LRS HOT OILERS -SECURE TREE AND CELLAR AREA -PULL CHANGE TRAILER,FUEL TRAILER, AND CUTTINGS BOX AWAY FROM RIG PREP RIG FOR MOVE -RELEASE RIG AT 20:00 HOURS Printed 11/18/2013 10:21:30AM MPF-53, Well History (Pre Rig Sidetrack) Date Summary 11/13/13 RIH W/BAKER 4-1/2"x7"DELTA WHIPSTOCK,WHIPSTOCK OAL=18', MAX OD=3.625" CCL STOP DEPTH=11963.58', CCL TO TOP OF WHIPSTOCK=18.42'. SET TOP OF WHIPSTOCK AT 11982', ORIENTED 2.9° ROHS. RA TAGS INSTALLED 8.65 FROM TOP OF WHIPSTOCK. CORRELATED TO ATLAS PRODUCTION SERVICES LOG DATED 13-SEP-1995. WELL S/I ON DEPARTURE, DSO NOTIFIED. FINAL T/I/O=0/0/0 PSI. 11/18/13 CTU#9- 1.75"CT-Scope: Squeeze Cmt Whipstock. MIRU CTU. PT surface lines. MU 2.75"BDJSN cementing BHA(OAL=9.978'). Secure unit. 11/19/13 CTU#9- 1.75"CT-Scope: Squeeze Cmt Whipstock. Secure unit.Travel to GPB.Travel to Loc.Wait on cementers and fluids. Cement pump return to deadhorse for repair. Secure unit and changeout in deadhorse. Return to unit. RU cementers. Stab on. RIH while bullheading 10 bbls 60/40 McOH + 130 bbls of 1% KCL down backside. 11/20/13 CTU#9- 1.75"CT-Scope: Squeeze Cmt Whipstock. RIH Bullheading 88 bbls 1% KCL down backside +90 bbls of diesel.Tag whipstock at 11971'and correct to 11986'(pinch point). PUH 10'and paint flag. Injectivity test. Pump 30 bbls of 15.8 ppg Class G cement.Achieve 500 psi squeeze. Lay in remaining CMT 1:1. PUH above WCTOC. Hold 1000 psi squeeze pressure.Total cement behind pipe=7.2 bbls of 15.8 Class G. Drop ball. RIH. Cleanout cement down to 11982'.TOC= 11982'. POOH 80%-Wash nipples&GLM-Wash BOP-RDMO. 11/23/13 T/I/O=0/0/0 Conducted PJSM w/rig personnel.Tree cap was removed on arrival. Installed lubricator& PT'd 300 psi low/3500 psi high. Barriers used SV&SSV. Set 2 9/16"CIW""H"TWC#MP-16 @ 104"w/ 1-1'ext. 11/23/13 MIT-T to 2400 psi WSR continued. 11/24/13 T/I/O=0/0/0 MIT-T to 2400 psi FAIL. LLR of 2 bpm at 1900 psi. Caught fluid at+/-3 bbls, Pumped 19 bbls diesel total for LLR. Final WHPs=1200/0/0. 11/24/13 T/I/0=20/20/0 Conduct PJSM; Start barriers list=SV&SSV Tested independently passed; Rig up Lubricator with BPV and setting tool;Test to 300 and 3500 psi for 5 min. LTT passed; Open barriers and set 4 1/16 CIW"H"BPV#MPP-27 @ 111"w/1-1'ext. Removed SSV and installed second swab. Page 1 of 1 • North America-ALASKA-BP Operation Summav Report g-. Common Well Name:MPF-53 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date.12/27/2013 End Date:1/5/2014 X3-0146L-C:(2,926,600.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/29/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292257800 Active datum:MPF-53A @38.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/27/2013 12:00 - 19:00 7.00 MOB P PRE HOLD PJSM.BACK RIG OFF WELL.SPOT ON S PAD AND WAIT FOR RIG MOVE. PICK RIG MATS FROM S-116 SITE. CLEAN AND LEVELAREAAROUND WELLHEAD. MOVE 40 MAN CAMP FROM MOBIL PAD TO MILNE A PAD. MOVE SATELLITE TRAILER FROM S-PAD TO MILNE A PAD. 19:00 22:00 3.00 MOB P PRE WARM UP RIG HYDRAULICS WHILE WAITING ON SECURITY PERSONNEL FOR RIG MOVE -WSL COMPLETED WELL WORK TRANSFER FOR S-116A WITH S-PAD OPERATOR 22:00 - 00:00 2.00 MOB P PRE MOVE RIG FROM S-PAD TO MILNE POINT F-PAD 12/28/2013 00:00 - 02:00 2.00 MOB P PRE CONTINUE MOVE RIG FROM S-PAD TO MILNE POINT F-PAD 02:00 - 03:00 1.00 MOB P PRE PULL OVER AT Z-PAD ENTRANCE TO ALLOW TRAFFIC TO PASS 03:00 - 06:00 3.00 MOB P PRE CONTINUE MOVE RIG FROM S-PAD TO MILNE POINT F-PAD 06:00 - 06:30 0.50 MOB P PRE CREW CHANGE. RIG AT MILNE POINT CUTTOFF/SPINE ROAD 'INTERSECTION. 06:30 - 10:30 4.00 MOB P PRE CONTINUE RIG MOVE. STOP AT TEXACO PAD AND CHECK IN WITH MILNE SECURITY. 10:30 - 13:30 3.00 MOB P PRE CONTINUE RIG MOVE FROM S PAD TO MPU F PAD. RIG AT MILNE A PAD. 13:30 18:00 4.50 MOB P PRE CONTINUE RIG MOVE FROM S PAD TO MPU F PAD. RIG AT MILNE L PAD. [ '18:00 - 19:00 1.00 MOB P PRE CONTINUE RIG MOVE FROM S PAD TO MPU F PAD. ARRIVE ON PAD AT 19:00. 19:00 - 22:00 3.00 MOB P PRE ARRIVE ON PAD,LEVEL AND PREP PAD FOR RIG -REMOVE SNOW DRIFTS FROM PAD -SHOVEL SNOW FROM AROUND WELL -SET RIG MATS 22:00 - 22:30 0.50 MOB P PRE PJSM AND BACK RIG OVER WELL -LINE UP RIG ON RIG MATS,PULL FORWARD AND TEST ESD -SPOT RIG OVER WELL -SET DOWN RIG ACCEPT RIG AT 22:30 ON 12/28/13 22:30 - 23:30 1.00 MOB P PRE CONTINUE WITH RU OPERATIONS -PACK SNOWAROUND CELLAR WALLS -MOVE SATELLITE OFFICE FROM MPU A-PAD TO F-PAD 23:30 - 00:00 0.50 MOB P PRE PJSM AND LEAK TIGHT TEST TREE VALVES TO VERIFY BARRIERS BEFORE ND TREE CAP -CLOSE 2 SWAB AND MASTER VALVES -PRESSURE UP TO 3000 PSI,CONFIRM LEAK TIGHT -BARRIERS VERIFIED LEAK TIGHT TEST OF TREE VALVES Printed 1/14/2014 3.40.06PM North America-ALASKA-BP Page 2 eta • Operation Summary Report ' '40,e44.0440.aloft Common Well Name:MPF-53 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/27/2013 End Date:1/5/2014 1X3-0146L-C:(2,926,600.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/29/1995 12:00:00AM I Rig Release: Rig Contractor:NORDIC CALISTA I UWI:500292257800 Active datum:MPF-53A @38.00usft(above Mean Sea Level) Date 1 From-To Hrs 1 Task Code 1 NPT i NPT Depth Phase Description of Operations (hr) (usft) 12/29/2013 li 00:00 - 06:00 6.00 RIGU P PRE WITH GOOD LEAK TIGHT TEST ON TREE VALVES,ND TREE CAP,NU BOPS -PJSM AND NU LUBRICATOR TO BOPS -PJSM AND MU STUFFING BOX TO INJECTOR AND STAB INJECTOR ONTO LUBRICATOR -PJSM AND LIFT NEW 2-3/8"REEL INTO REEL HOUSE -PJSM AND PREP COIL END FOR GRAPPLE AND PULL ACROSS COIL RIG UP OPERATIONS SIMOPS: -SPOT SECONDARY EQUIPMENT -SPOT SATELLITE OFFICE 200'FROM RIG 06:00 - 06:30 0.50 RIGU P PRE CREW CHANGE. DISCUSS STATUS OF RIG UP. HOLD PJSMS TO CONTINUE TASKS UNDERWAY. 06:30 - 13:00 6.50 RIGU P PRE CONTINUE TO RIG UP. MILNE SHORT ON HARDLINE. CALL PBU DSM CREW TO ASSIT WITH FLOW BACK TANK RIG UP. CALL FOR DELIVERY OF 13.1PPG KWF. 9.2 FLO VIS,AND 11.8 BRINE.. FILL BOPS AND EQUIPMENT WITH WATER. OBTAIN GOO 3500 PSI SHELL TEST. 13:00 - 22:00 9.00 BOPSUR P PRE PRESSURE TESTALL BOP EQUIPMENTAS PER AOGCC REGS,SUNDRY#313-488,AND CRT-AK-10-45 TEST BOPE TO 250/3500 PSI FOR 5 CHARTED MIN TEST CHOKE VALVES,CHOKE HCR,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES, BOP RAMS AND ANNULAR PREVENTER. VBRANDANNULAR TESTED WITH BOTH 2-3/8"AND 3-1/2" 2-3/8"RAMS TESTED WITH 2-3/8" 3"RAMS TESTED WITH 3" TEST 2 FULL OPENING SAFETY VALVES FUNCTION BOPE FROM BOTH REMOTE PANELS TESTIS WITNESSED BY TOOLPUSHER AND WSL. TEST GAS ALARMS AND DRAW DOWN TEST OF ACCUMULATOR. AOGCC INSPECTOR BOB NOBLE WITNESSED TEST. 22:00 - 23:00 1.00 BOPSUR P PRE PJSM,PICK UP MPD LUBRICATOR,INSTALL PUMP IN SUB, FLOOD LUBRICATOR AND MPD LOOP. 23:00 - 00:00 1.00 BOPSUR P PRE PRESSURE TEST LUBRICATOR AND MPD LOOP, 250-3500 PSI,5 MINS-CHART TEST. 12/30/2013 00:00 - 02:30 2.50 BOPSUR P PRE PICK UP INJECTOR,CUT 5'COIL,HEAD UP BHI,PULL TEST TO 35K# Printed 1/14/2014 3:40:06PM • . North America-ALASKA-BP Page 3 co, Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/27/2013 End Date:1/5/2014 1X3-0146L-C:(2,926,600.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/29/1995 12:00:00AM I Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292257800 Active datum:MPF-53A @38.00usft(above Mean Sea Level) Date From-To Firs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 06:00 3.50 BOPSUR P PRE -MOVE INJECTOR OVER BUNG HOLE AND PUMP 10 BBL MEOH SPEAR,15 BBL WATER SPACER,CHASE WITH MUD TO FILL THE COIL -PRESSURE TEST HIGH PRESSURE !SCREENS AND REEL IRON -PRESSURE TEST COIL TUBING CONNECTOR -STAB INJECTOR,PRESSURE TEST INNER REEL VALVE,INJECTOR LUBRICATOR, UPPPER AND LOWER QTS,INJECTOR PACK OFFS,AND BHI CHECKS TO 250/3500 PSI 'FOR 5 MIN CHARTED TEST 06:00 - 06:30 0.50 BOPSUR P PRE i CREW CHANGE. DISCUSS CURRENTS OPS AND TESTING. MAKE EQUIPMENT CHECKS. HOLD PJSM TO CONTINUE TESING INNER REEL VALVE AND CHECKS. 06:30 - 09:30 3.00 BOPSUR P PRE CONTINUE AN COMPLETE PT ON INNER REEL VALVE AND DFCV. PRESSURE TEST CHECK VALVES TO 250 AND 3500 PSI. CHART SAME.PASSED. 09:30 - 13:30 4.00 BOPSUR P PRE HOLD PJSM WITH MILNE WELLS SUPPORT. BRING LUBRICATOR TO RIG FLOOR. COMPARE MILNE AND NORDIC BPV PROCEDURES. VERIFY SPACING TO BPA AND TREE VALVES. NU LUBRICATOR. PT TO 250 AND 3500 PSI. CHARST TEST. PASSED. ENGAGE AND PULL BPV. LEAK TIGHT TEST MASTER AND SWAB. REMOVE AND RD LUBRICATOR. REMOVE TOOLS FROM RIG. 13:30 . - 15:00 1.50 BOPSUR P PRE 'RECONFIGURE LUBRICATOR UNDER INJECTOR. GET ON WELL. PT LUBRICATOR TO 250 AND 3500 PSI. CHART TEST. PASSED. PUMP SLACK FORWARD AT 3.1 BPM AT 2970 PSI. 15:00 - 16:30 1.50 BOPSUR P PRE PJSM. BRING MILLING TOOLS TO RIG FLOOR. MU WINDOW MILLING BHA. STAB COIL. TEST TOOLS. GET ON WELL. PRESSURE TEST QTS TO 250 AND 3500 PSI. CHART SAME. PASSED. 16:30 - 17:00 0.50 STWHIP P WEXIT RUN IN HOLE. 17:00 - 18:30 1.50 STWHIP N DFAL WEXIT MWD ANNULAR PRESSURE SENSOR/SYSTEM NOT WORKING. POOH TO CHANGE TOOLS.LD MWD TOOLS, PICK UP NEW MWD TOOLS, i STAB INJECTOR,TEST QTS-250/3500 PSI-PASSED 18:30 - 23:00 4.50 STWHIP P WEXIT RUN IN HOLE WITH MILLING BHA -LOG FORMATION TIE-IN TO THRZ WITH-24' !CORRECTION -CONTINUE RIH,TAG CEMENT STRINGERS AT 11,987' 123:00 - 23:45 0.75 STWHIP P WEXIT DISPLACE WELL TO 9.2 PPG PRO FLO MUD, TAKE RETURNS TO TIGER TANK Printed 1/14/2014 3:40:06PM • 41) Page 4 t�- North America-ALASKA-BP Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/27/2013 End Date:1/5/2014 1X3-0146L-C:(2,926,600.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:NORDIC 2 Spud Daterfime:7/29/1995 12:00:OOAM !Rig Release: Rig Contractor:NORDIC CALISTA !UWI:500292257800 Active datum:MPF-53A @38.00usft(above Mean Sea Level) Date From-To j Hrs Task 1 Code NPT NPT Depth 1 Phase Description of Operations (hr) 1 (usft) 23:45 00:00 0.25 STWHIP P WEXIT PERFORM RIG EVACUATION DRILL WITH SIMULATED MAN DOWN.IN AAR,DISCUSS: -TIMELY CREW RESPONSE TO MUSTER LOCATION,INCLUDING TRUCK DRIVER AND BTT REP RESPONSE -GO-BAG LOCATIONS AND CONTENTS -30 MIN ESCAPE PACK LOCATIONS AND -EXTRA BOTTLE LOCATIONS -RE-ENTRY PROCEDURES AND NOTIFICATION PROCESS 12/31/2013 00:00 - 01:00 1.00 STWHIP P WEXIT CONTINUE PERFORM RIG EVACUATION DRILL WITH SIMULATED MAN DOWN.IN AAR, j DISCUSS: -TIMELY CREW RESPONSE TO MUSTER LOCATION,INCLUDING TRUCK DRIVER AND BTT REP RESPONSE -GO-BAG LOCATIONS AND CONTENTS -30 MIN ESCAPE PACK LOCATIONS AND EXTRA BOTTLE LOCATIONS -RE-ENTRY PROCEDURES AND NOTIFICATION PROCESS 01:00 - 02:00 1.00 STWHIP P WEXIT 1 MILL CEMENT STRINGERS FROM 11,987'TO 11,988' TAG UP TO WHIPSTOCK PINCH POINT AT 11,988.2' 02:00 - 06:00 4.00 STWHIP P WEXIT TIME MILL WINDOWAT 11,988'MD TO 11,993' ( ' -okt MD PUMP IN AT 2.74 12.79 BPM IN/OUT, YA PRESSURE 3015/2850 PSI ON/FREE SPIN jj WOB 1-3K,ECD 10.82 PPG, MW 9.23/9.12 PPG IN/OUT.PVT 316 BBLS ROP 0.7 FPH,IA 245 PSI,OA 65 PSI,UP WT 40K,DN WT 17K METAL CUTTINGS IN RETURNS 06:00 - 06:30 0.50 STWHIP P j WEXIT CREW CHANGE. DISCUSS OPERATIONS. i CHECK EQUIPMENT STAUS,MAKE RIG 1 CHECKS AND ROUNDS. 06:30 - 09:00 2.50 STWHIP P fi WEXIT I CONTINUE TO MILL AHEAD FROM 11994.5' 2850 PSI AT 2.73 BPM IN/OUT. WOB:0.7-1.0 K 150-250 PSI MOTOR WORK. IA/OA/PVT:380 PSI/63 PSI/319 BBLS. WHP/BHP/ECD:29 PSI/3974 PSI/10.53 PPG. MILL TO 11,994.5' (UNCORRECTED ESTIMATED BOTTOM OF WINDOW) 09:00 - 13:00 4.00 STWHIP P WEXIT DRILL AHEAD IN FORMATION FROM 11,995'TO 12,005'MD 2800 PSI AT 2.73 BPM IN/OUT. WO B:0.5K 13:00 - 14:30 1.50 STWHIP P WEXIT REAM AND DRY DRIFT WINDOW, PULL UP HOLE ABOVE WINDOW. 14:30 - 18:30 ! 4.00 STWHIP P WEXIT OPEN EDC,PUMP 10 BBL SPACER, DISPLACE WELL TO 11.8 PPG KWF POOH FROM 11,979'MD TO 300'MD 18:30 19:00 0.50 STWHIP P WEXIT FLOW CHECK WELL-NO FLOW. 119:00 - 20:30 1.50 STWHIP P WEXIT PJSM,LAY DOWN MILLING BHA, BLOW DOWN BAKER TOOL 120:30 - 22:00 1.50 DRILL P PROD1 PJSM,PICK UP BUILD SECTION BHA, -HCC 4-1/8"BI-CENTER BIT -2-7/8"BHI ULTRA LOW MOTOR W/3.2 AKO -3"COIL TRAK WITHOUT RESISTIVITY -TEST QTS 250/3500 PASSED. Printed 1/14/2014 3:40:06PM • North America-ALASKA-BP Page 5 Operation Summary Report Common Well Name:MPF-53 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/27/2013 End Date:1/5/2014 1X3-0146L-C:(2,926,600.00) Project Milne Point Site:M Pt F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/29/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292257800 Active datum:MPF-53A©38.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) usft 22:00 - 00:00 2.00 DRILL P PROD1 RUN IN HOLE TO 10,350'MD 1/1/2014 00:00 - 01:00 1.00 DRILL P . PROD1 RUN IN HOLE FROM 10,350'MD TO 11969'MD, LOG TIE IN,-24'CORRECTED DEPTH. 01:00 - 01:30 0.50 DRILL N DFAL 12,005.00 PROD1 DISPLACE WELLTO 9.2 PPG FLO PRO MUD, MWD FAILURE. 01:30 - 03:45 2.25 DRILL N DFAL 12,005.00 PROD1 DISPLACE WELL BACK TO 11.8 PPG KWF. 03:45 - 05:00 1.25 DRILL N DFAL 12,005.00 PROD1 PULL OUT OF HOLE FOR MWD TOOL CHANGE, FROM 11,969'-10,200'MD.MWD TOOL START WORKING. RIH TO 12,005'MD,TEST MWD TOOL.MWD TOOL APPEARS TO NOW BE WORKING. 05:00 - 06:00 1.00 DRILL N DFAL 12,005.00 PROD1 DISPLACE WELL TO 9.2 PPG FLO PRO MUD. 06:00 - 08:30 2.50 DRILL N DFAL 12,005.00 PROD1 MWD HOT TOOL MALFUNCTIONING AGAIN. FINISH SWAP TO 9.2 PPG MUD. CIRCULATE ABOVE WINDOW WAITING ON 11.8'PPG FLUID. 08:30 - 10:30 2.00 DRILL P WEXIT HOT FUNCTIONING,WHILE WAITING ON FLUID DRILL AHEAD FROM 12,005' FREESPIN 3270 PSI AT 2.7 BPM. 9.3/9.2 PPG IN/OUT WITH 530 PSI WHP FOR 11.8 PPG ECD TARGET AT WINDOW. 1.5 DHWOB AT 30-50 FPH ROP. START LOSING FULL RETURNS AT 12,040'. 2.7/2.3 BPM IN/OUT. DRILL TO 12087',DLS 35-37,UNABLE TO GET 40 DLS NEEDED. 10'30 - 12:30 2.00 DRILL N DPRB 12,087.00 WEXIT WAIT ON 11.8 PPG FLUID TO ARRIVE ON LOCATION. CIRCULATE 9.2 PPG MUD HOLDING 11.8 PPG ECD.PUMPING 1.5 BPM WITH 1.3 BPM RETURNS. 12:30 - 16:00 3.50 DRILL N DPRB 12,087.00 WEXIT SWAP WELL TO 11.8 PPG BRINE,LAY IN WHILE POH AFTER 10 BBLS ABOVE BIT. LOST 25 BBLS ON TRIP OUT OF HOLE IN ADDITION TO PIPE VOLUME. 16:00 - 18:30 2.50 DRILL N DPRB 12,087.00 WEXIT TAG UP,FLOW CHECK,WELL ON VAC. GET OFF WELL,LAY DOWN BHA.BIT 1-1, LOOKS NEW. DIAL UP MOTOR TO 3.8 MO,CHANGE OUT GR/HOT. STATIC LOSS RATE 14 BPH. MU BUILD BHA. GET ON WELL,PRESSURE TEST QTS. 18:30 - 21:30 3.00 DRILL N DPRB 12,087.00 WEXIT RIH HOLE WITH BUILD ASSEMBLY F/72'- 11,800'MD. LOG TIE-IN WITH(-23.5)DEPTH CORRECTION. CONTINUE RIH TO BOTTOM. 21:30 - 00:00 2.50 DRILL N DPRB 12,087.00 WEXIT PJSM,DISPLACE WELL FROM 11.8 PPG KWF, TO 9.2 PPG POWER PRO MUD 1/2/2014 00:00 - 05:00 5.00 DRILL P PROD1 DRILL BUILD FROM 12,089'MD TO 12,250'MD, 3325 PSI AT 2.73 BPM IN/OUT. WOB:2-3K 150-250 PSI MOTOR WORK IA/OA/PVT:320 PSI/63 PSI/75 BBLS. WHPBHP/ECD:483 PSI/4375 PSI/11.80 PPG. Printed 1/14/2014 3 40:06PM Tree: Cameron 2 9/16" MPU F-53 Wellhead: 11"x11"5M FMC Gen 5 w/ 11"x 2 7/8"tbg. hng. andw/2 Orig. KB Elev.= 49.2'(N 27E) 7/8"8 rd EUE threads top and Orig. GL elev. = 13.6' RT To Tbg.Spool=32.62'(N 27E) bottom and 2.5" CIW 'H'bpv profile 20"91.1 ppf, H-40 113' KOP @ 500' Max. hole angle=66 deg. from 3700 to TD. Hole angle across perfs=33 deg. 9 5/8", 40#/ft, L-80 Btrc. 6750' -tai;12.6*,L-13O 44,OR4 STRIA)U 7"26 ppf, L-80, NSCC Casing i (drift ID=6.151", cap. =0.0383 bpf) $ ? X 4-1/2TNT PAckg It 00• (cap w/2 7/8"tubing inside= .02758 bpf) H J Stimulation Summary 9/25/95: 149 M# 16/20 Carbolite, flush Perforation Summary Ref loq: 09/13/95 GR/CCL/FD V2. 12.(4 �L cbp II 600 i "B"Sand q i• SIZE SPF INTERVAL (TVD) 1 4.5" 5 11,952'-11,960' 6972-6980' _ �7.".LShort Joint 11819' 11838' 32 gm Alpha Jet charges(EHD=0.50", ,� * wn 1p�'T�LtIG' 1 t 61' At TTP=32.0")@ 135/45 deg.phasing 7'oP of f.6N1e401- N1144151 "A"Sand -���_r41 Note: Tree saver rubber(6"x 1"x 1" ):.:.�.� left in the hole 9/25/95 SIZE SPF INTERVAL (TVD) ...�.+� Top of 25 bands&4 Flat Guards 3-3/8" 6 12008'-12096' 7020'-7094' ` ,JO 12265' 3-3/8" 6 12008'-12048' reperf 3-3/8" 6 12054'-12074' reperf t• ZF A 3-3/8" 6 12075'-12095' 7128'-7145' �+ r 7" Float collar (PBTD) 12,309' 22 gm.Jumbo Jet "big hole"charges 7" Float shoe 12,398' (EHD=0.76".TTP=6.4")@ 60 deg.phasing DATE REV.BY COMMENTS MILNE POINT UNIT 09/11/95 JBF D&C by bo27E 02/19/96 DLH Initial CompNaletrsion by Nabors 4 ES WELL F-53 8/8/00 GMH RWO Nabors 4ES API NO: 50-029-22578 12/20/00 M. Linder RWO Nabors 4ES 6/14/05 L. Hulme ESP Upsize&Add Perf Nabors 4ES BP EXPLORATION (AK) • • \O I�� w w 9 THE STATE Alaska Oil and Gas F�' vi ALASKA SKA Conservation Commissi GOVERNOR SEAN PARNELL 333 West Seventh Avenue rR' pF P. Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1433 Fax: 907.276.7542 John McMullen SCANNED Nov 13 2013 Drilling Technologist l �!/O BP Exploration (Alaska), Inc. I P.O. Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Unit, Kuparuk River Oil Pool, MPF-53 Sundry Number: 313-488 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy :. Foerster �-�- Chair, Commissioner DATED this It day of October, 2013. Encl. ti • STATE OF ALASKA • 40 RECEIVED - . ALASSOIL AND GAS CONSERVATION COMMISSION ai\ 13 APPLICATION FOR SUNDRY APPROVAL�d c /,1 20 AAC 25.280 OGC 1. Type of Request: ■ ❑Abandon ®Plug for Redrill ❑Perforate New Pool ❑Repair Well ❑Change Approved Program ❑Suspend ❑Plug Perforations ❑Perforate ❑Pull Tubing ❑Time Extension ❑Operations Shutdown ❑Re-Enter Suspended Well ❑Stimulate ❑Alter Casing ❑Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. ❑Exploratory ❑Stratigraphic 195-108 • 3. Address: 6. API Numbe ®Development ❑Service P.O. Box 196612,Anchorage,Alaska 99519-6612 • 50.029-22578-00-00 • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? MPF-53 Will planned perforations require a Spacing Exception? ❑Yes N No 9. Property Designatior 10.Field/Pool(s): 4 7� s ADL 025509&355018 Milne Point Unit/Kuparuk River_Sands `` to 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured) 12425' ' 7429' J 12309' 7329' None 12265' Casing Length Size MD TVD Burst Collapse Structural Conductor 78' 20" 32'- 110' 32'- 110' 1490 470 Surface 6715' 9-5/8" _ 35'-6750' 35'-4408' 5750 3090 Intermediate - Production 12365' 7" 33'-12398' 33'-7405' 7240 5410 Liner Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 11952'- 12095' 7025'-7145' 2-7/8",6.5# L-80 11841' Packers and SSSV Type: None Packers and SSSV None MD(ft)and ND(ft): 12. Attachments: 13.Well Class after proposed work: ■� Description Summary of Proposal N BOP Sketch 1 1 ❑Detailed Operations Program ❑Exploratory ❑Stratigraphic N Development ❑Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation November 15,2013 ❑Oil ❑WINJ ❑WDSPL ❑Plugged 16. Verbal Approval: Date ❑Gas ❑GINJ ❑GSTOR ❑Abandoned Commission Representative: ❑WAG ❑SPLUG N Suspended . 17. I hereby certify that the for-••n. true - d correct to the best of my knowledge. Contact: Matt Ross,564-5782 Printed Name: J.J."'c ` Title: Engineering Team Leader E il: ossmoebp.com riiimp. Air Signatur-• Phone: 564-4711 Date: Q g Commission Use Only Conditions of approval: Notify Commission so that a representative may witness 1� ��� Sundry Number: .. ❑Plug Integrity L BOP Test ❑Mechanical Integrity Test ❑Location Clearance ...)Other: r `J /-05 1 T 7 5-6)°P S 7l -1-eriiat--C p6vy pia �� Spacing Exception Required? ❑Yes El Subsequent Form Required: lC �l-j 7' Approved By: APPROVED BY l COMMISSIONER THE COMMISSION Date: ft-- /3 Form 10-403 Revised 10/ 012 Submit In Duplicat: 17 .‘i A. Approve{ rr rd for l2 months from the date of approval 17/—,1= 10/710/13 VITAL `ice RBDMS OCT 14 2 " c k • • • To: Alaska Oil & Gas Conservation Commission From: Matthew Ross bp CTD Engineer Date: September 11, 2013 Re: MPF-53 Sundry Approval Sundry approval is requested to plug the MPF-53 perforations as part of the pre-rig prior to the drilling and completion of proposed MPF-53A, AL1 &AL2 coiled tubing sidetracks. History and current status: MPF-53 was drilled, perforated, and fractured in September-1995 &was completed with an ESP in February-1996. In 1998 the well was put on a yearly acid wash schedule to mitigate scale problems at the ESP. A RWO was performed in August 2000 & again in December 2000. In early 2001 water started breaking through and has been climbing as oil rate has been declining. A RWO occurred in June 2005 to upsize the ESP due to water breakthrough from the offset injector MPF-88i. This well is supported by both MPF-70i and MPF-88i based on pressure trends. Proposed plan: Sidetrack MPF-53 to the MPF-53A, ALl & AL2 locations by Nordic 2 Coiled Tubing Drilling rig on or around November 20, 2013 using the managed pressure drilling technique with the purpose of the sidetrack to relocate the well to two areas that has been identified as unswept. The MPF-53A sidetrack will exit the existing 7" liner and kick off in Kuparuk A3 sand and land in Kuparuk Al sand. This tri-lateral sidetrack will be completed with 2-7/8" TH511 slotted liner and blanks over faults/ swept zones with solid liner tie back into the parent wellbore. This Sundry covers plugging the / existing MPF-53 perforations via the pre-rig coil cement job and a liner top packer (alternate plug placement per 20 AAC 25.112(i) set post rig). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. die elf 5 ifrOie Vico 4 0 7621, i-1-°g6 Cl' � ,r fy rO ce ��- l0 ea, "' r/ �; ��' - Cv��e f U v/c � r61. _ 61'?L- • i; � Tt C/n cl.e// V G�cPn C4/5 P/ �% -roux. i Ir s ib"te)" f rG�e ° ft CD vo-Y P/43 • • Required Permit? Pre-Rig Work(scheduled to begin November 15th,2013) 10-403 PTD 1. S Drift for whipstock to 12,000' No No 2. E Set 4-1/2"x7" whipstock at 11,982' MD 3 „AC No Squeeze 12 bbl, 15.8 ppg cement past whipstock&squeeze 5bbls into ./ 3. formation. (TOC @ 11,982') Yes* No 4. V Set BPV No No 5. V PT MV,SV,WV No No *Approved alternate plug placement per 20 AAC 25.112(i) 1�p5P from PTD > p 5 Required Permit? Rig Work(scheduled to begin November 20th,2013) 10-403 PTD 1. MIRU and test BOPE 250 psi low and 3,500 psi high. Ai'o iii Yes 2. Mill 3.80”window at 11,982' and 10' of rathole. 916tyc5 Yes 3. Drill A lateral: 4.125" OH, 2400' (40/12 deg DLS planned) No Yes 4. Run 2-7/8" Slotted liner with aluminum KO billet,top at 12,912' MD. No Yes 5. Drill AL1 lateral: 4.125" OH, 1460' (12 deg DLS planned) No Yes 6. Run 2-7/8" Slotted liner with aluminum KO billet,top at 12,662' MD. No Yes 7. Drill AL2 lateral: 4.125" OH, 1760' (12 deg DLS planned) No Yes 8. Run 2-7/8" Slotted/solid liner,top at 11,782' MD. No Yes 9. Freeze protect well to 2500' MD No Yes 10. Set TWC; RDMO No Yes Post-Rig Work: 1. Slickline to set KB liner top packer*. 2. RWO to run new ESP completion. 3. Re-install wellhouse, flowline. Matthew Ross CTD Engineer 564-5782 CC: Well File Joe Lastufka • • Tree:Cameron 2 9/16" 5M, MPU F-53 Wellhead: 11"x11"5M FMC Gen 5 w/ 11"x 2 7/8"tbg. hng.andw/2 p # Orig.KB Elev.= 49.2'(N 27E) 7/8"8 rd EUE threads top and Orig.GL elev.= 13.6' RT To Tbg.Spool=32.62'(N 27E) bottom and 2.5"CIW'H'bpv profile 20"91.1 ppf, H-40 113' 0 I Camco 2 7/8"x 1" 136' KOP @ 500' % � 1 sidepocket KBMM GLM Max. hole angle=66 deg.from 0 3700 to TD. 0 Hole angle across perfs=33 deg. 9 5/8",40#/ft, L-80 Btrc. 6750' 0 2 7/8"6.5 ppf, L-80,8 rd EUE tbg. 0 ' (drift ID=2.347", cap.=0.00592 bpf) f Camco 2 7/8"x 1" sidepocket KBMM GLM 11560' 7"26 ppf, L-80,NSCC Casing 0 (drift ID=6.151",cap.=0.0383 bpf) (cap w/2 7/8"tubing inside= .02758 bpf) p HES"XN" nipple (2.205"ID) 11701' 0 MS-1 Pressure Head 11717' 7 % (3)Centrilift Pumps, 71GC4100, 11718' - Model-(2)GPMTAR(1)GPLTAR 1:1 $1 Centrilift Tandem Rotary Intake TVD-' 0 Mr Gas Separator, 11770' Model-GRSTXARH6 0. jiMI Stimulation Summary c Centrilift Tandem Seal Section 11776' 5s GSB3DB UT/LT AB/HSN PFSA/FSA CL5 9/25/95: 149 M#16/20 Carbolite,flush Centrilift Motor,266 HP,1660 11790' Perforation Summary volt,98 amp,Model KMHU/L Ref log: 09/13/95 GR/CCL/FD "B"Sand Phoenix Multi Sensor 11835' Sensor TVD=6928` SIZE SPF INTERVAL (TVD) x\ 6 Fin Centralizer I 11839' 4.5" 5 11,952'-11,960' 6972-6980' 7"Short Joint 11819' 11838' 32 gm Alpha Jet charges(EHD=0.50", TTP=32.0")@ 135/45 deg.phasing — "A"Sand Note:Tree saver rubber(6"x 1"x 1") left in the hole 9/25/95 SIZE SPF INTERVAL (TVD) Top of 25 bands&4 Flat Guards 3-3/8" 6 12008'-12096' 7020'-7094' — 3-3/8" 6 12008'-12048' reperf 12265' 3-3/8" 6 12054'-12074' reperf 3-3/8" 6 12075'-12095' 7128'-7145' 7" Float collar(PBTD) 12,309' 22 gm.Jumbo Jet "big hole"charges 7" Float shoe 12,398' (EHD=0.76",TTP=6.4")@ 60 deg.phasing DATE REV.BY COMMENTS MILNE POINT UNIT 09/11/95 JBF D&C by b 02/19/96 DLH Initial CompNaletion ors 27E by Nabors 4 ES WELL F-53 8/8/00 GMH RWO Nabors 4ES API NO: 50-029-22578 12/20/00 M. Linder RWO Nabors 4ES 6/14/05 L. Hulme ESP Upsize&Add Perf Nabors 4ES BP EXPLORATION (AK) • • Tree: Cameron 2 9/16" 4110 MPU F-53A AL1 , AL2 • Wellhead: 11"x11"5M FMC Gen 5 proposed C'TD sidetrack Orig. KB Elev.= 49.2'(N 27E) 9 w/ 11"x27/8"tb . hn 9. andw/2 7/8"8 rd EUE threads top and Orig. GL elev.= 13.6' bottom and 2.5"CIW'H'bpv profile RT To Tbg.Spool=32.62'(N 27E) 20" 91.1 ppf, H-40 113' KOP @ 500' Max. hole angle= 66 deg.from 3700 to TD. Hole angle across perfs=33 deg. 9 5/8",40#/ft, L-80 Btrc. 6750' I -65° sail inclination (expect to be wireline accessible) 7"26 ppf, L-80, NSCC Casing (drift ID=6.151", cap. =0.0383 bpf) (cap w/2 7/8"tubing inside= .02758 bpf) I –11,600'MD,4.5"HES X-Nipple(3.813 id) --11,670'MD, 4.5"HES RCH LCH RCPT –11,680'MD, Base 4.5"HES RCH LCH LTCH =� ► –11,687'MD 4-1/2"x 7"HES pkr. KB Liner Top Packer -11,707'MD,4.5"HES X-Nipple(3.813 id) w/RHC plug —P –11,727'MD TOL 11,782 MD 4-1/2"WLEG TOWS 4-1/2" recommend Baker Gen II :I i TT Monobore at 11,982'MD' — 4 2-7/8"slick/slotted L-80,Hyd 511 6.4# (dine set post RWO,service coil down squeeze 7" Short Joint 11819' 1183'' and cleanout) "B"Sand -/8"slick/slotted L-80 - X11 E SIZE EA INTERVAL (TVD) :fillet 12,66 /� 4.5" © 11952'-11,960' 6972-6980' i 'tI 9it � If 32 gm Alpha Jet charges(EHD=0.50", - 2-7/8"Aluminum Flo-thru Billet 12,912' f it it 3-1/4"TC-II,6.2#L-80-uncentralized X TTP=32.0")@ 135/45 deg.phasing i / t ' 2-7/8",Hyd 511 6.4#,slick slotted "A"Sand \`cN")" ✓ ,`� Note:Tree saver rubber(6"x 1"x 1") '',# ` left in the hole 9/25/95 SIZE SPF INTERVAL (TVD) r441:444 4C, Top of 25 bands&4 Flat Guards 3-3/8" 6 12008'-12096' 7020'-7094' 12265' 3-3/8" 6 12008'-12048' reperf 3-3/8" 6 12054'-12074' reperf 3-3/8" 6 12075'-12095' 7128'-7145' iall 7" Float collar (PBTD) 12,309' 22 gm.Jumbo Jet "big hole"charges 7" Float shoe 12,398' (EHD=0.76",TTP=6.4")@ 60 deg.phasing DATE REV.BY COMMENTS MILNE POINT UNIT 09/11/95 JBF D&C by Nabors 27E 02/19/96 DLH Initial Completion by Nabors 4 ES WELL F-53 8/8/00 GMH RWO Nabors 4ES API NO: 50-029-22578 12/20/00 M. Linder RWO Nabors 4ES 6/14/05 L. Hulme ESP Upsize &Add Perf Nabors 4ES BP EXPLORATION (AK) NORDIC CTD UNIT# 2 CHOKE / REEL/ CIRCULATION MANIFOLD DIAGRAM ■- `, • . Cho a P/nel - Standpipe 2 Circulation Line / ,� MM 11 ORo{ Calista BOP 26 / Driller Gauge' - •. ��. Manual Choke CIRCULATING MANIFOLD — ' M70 �MB MM9 MM16 t� BOP 27 . MM 15 / • •' SLB Transducer "-... : a MM 6 HOP 28 �f •� PVT Sensor / IMP MM ID: / BOP 10 Baker Choke MM13 MM4 11® MM17 / !: 21 / '. .-. Rev Cir Line BOP1/ Blind/Shear Last to Update 20-Aug-13 _ ....Air Blow down •• W . MM74 . Updated by Udo Cassee — ` / :� '•I16 BOP 12 f R Pipe/Slip • BOP 24 BOP 27 • BOP 26 KILL SIDE KILL SIDE BOP 19 CHECK / • VALVE MANUAL MANUAL BOP 20 Coiled Tubing t MM 18 _ / VALVE VALVE BOP 13` BOP 21 CHOKE SIDE • BRA Pipe/Slip ' 1` MP �� / � 1 MANUAL VALVE I I Ba rChoke +� / OP BHA Pipe/Slip A /BOP 22 CHOKE HCR VALV:� I I- •., 2 w� MP 7 • • Kill Lme 1 _ •1°,11 I����F.]��� '3 c ae :: 1 F•f`11kYM e a B v HP 11 HP 10,•• Trandttem, COILED TUBING I / •_ II E Choke Line • } CIRCULATING SYSTEM '/ — BOP 15 E Blind/Shear e HP 18 _ "' _ I O Y- ,y e„ 4 Kill Line—�I F / HP 14 A CSM 1 CSM 2 / BOP 16 R Pipe/51 p " HP d / - *.' zr BOP 18 To Inner Reel Valve / I , _ BOP 17 / / HP 15 HP7 HPS HP3 CSM3 CSM4 4 ,/ HP 13 / 1 J'I �BOP4 0i• / 1 I■ 1 ■1 _ I■ _ I/ 1 HP 12 HP 2 HP I - CSM 7 BOP 3 CSM 6 I BOPS t HP16 . I 1i. r-. // I'� BOP 2 1I cement line N2 1 1 _ SLB .'F CHOKE MANIFOLD //......... BOP 1 I/I BOP 6 1, P 17 N2 TriFlow 14 CM 85 I __. ! MG6 • _ Gauge ' I �y • -I CM 29 i 1.. crNSKE LINE OAS BUS — I BOP 30 / :_ Test Pump Inlet —CM 30 // I •, ^_ 1 (COCM3 / III . �I BOP 29 / HOIGauge PB1 .- Flowf/HC• / : Note 11 1 / 4Wav Block CM74 .9 CM1/ •C,M. ! f CM24 Y quid I .o. �° '�• aca C C.6a - .•- — P82 •C„ 7 - - leg is• I Baker Choke Line I m high from Wal ` a _, o . _,...1.1110.1111111 N 91011E LINE Mr CM73 s— :- o,o u•.m,2CM2 �}NM 111 t:::: ,M lir CM 25 KOKE LIN— CM26 — aPPI II -iva MOli nal� ^_ CM76 CM19 CM27 TIGER TANK I / N.JbGtish Tads * — — • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 N Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 Mr. Tom Maunder 5 -'' (� Alaska Oil and Gas Conservation Commission 53 333 West 7 Avenue � r Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPF -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • S BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPF -Pad 10/29/2011 Corrosion Initial top of Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement Vol. of cement pumped cement date inhibitor sealant date ft bbls ft gal MPF -01 1950450 50029225520000 10.2 N/A 10.2 N/A 122.4 8/72011 MPF -02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011 MPF -05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011 MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 822011 MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/92011 MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/212011 MPF -13 1950270 50029225490000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011 MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011 MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011 MPF -21 1961350 50029226940000 1.8 WA 1.8 N/A 15.3 8/6/2011 MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/1/2011 MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011 MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011 MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011 MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011 MPF -33 2010620 50029226890000 23 Need top Job MPF -34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011 MPF -37 1950250 50029225480000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011 MPF-41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011 MPF -42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011 MPF -45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/11/2011 MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A N/A MPF-49 1970030 50029227320000 2.3 WA 2.3 N/A 18.7 8/11/2011 MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011 " MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011 MPF -54 1961920 50029227260000 1.7 N/A 1.7 WA 10.2 8/12011 MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011 MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF-61 1951170 50029225820000 62 Need top job MPF-62 1951610 50029226090000 2.0 NN 2.0 N/A 13.6 9/12011 , MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011 MPF-69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011 MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/31/2011 MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF -77 1951360 50029225940000 0.2 N/A 0.2 N/A 6.8 10/5/2011 MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011 MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011 MPF -80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011 MPF -81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011 MPF-82 2091350 50029229710000 1.7 N/A 1.7 N/A 15.3 8/3/2011 MPF-83 2000930 50029229630000 1.2 N/A 12 N/A 13.6 8/3/2011 MPF -84B 2001760 50029229310200 1.2 N/A 1.2 N/A 10.2 8/32011 MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011 MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/122011 , MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/13/2011 MPF -88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011 MPF -89 2050900 50029232680000 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF -90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011 MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011 MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011 MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011 MPF -94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011 MPF -95 1981790 50029229180000 0.5 WA 0.5 N/A 3.4 8/13/2011 MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/1/2011 MPF -99 2061560 50029233320000 1.3 N/A 1.3 N/A 11.9 8/11/2011 , STATE OF ALASKA \ ALASKA _il AND GAS CONSERVATION COI"..JlISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: o Abandon o Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 8. Property Designation: ADL 355018 11. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Length Perforation Depth MD (ft): Perforation Depth TVD (ft): ¡,~::' ("\!' ~C::: I) \~\.,y ¡:C::,':' ~'k,.",,, '~'-Ë'<)¡¡. ~ tI~' '/jJ è,, ,'. .. '" ;:) r' , p:SIZ '''''U', o Suspend 0 Operation Shutdown 0 Perforate 181 Repair Well 0 Plug Perforations 0 Stimulate 181 Pull Tubing 0 Perforate New Pool 0 Waiver 46' 12425 7429 12309 7329 78' 6715' 12365' 181 Other ~) Z005 o Re-Enter Suspended Well o Tim~1extehQ{~~~ 5. Permit T¿¡'D~ii¡'~'ú'~ber: 4. Current Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 195-108 6. API Number: 50-029-22578-00-00 99519-6612 9. Well Name and Number: M PF·53 10. Field / Pool(s): Milne Point Unit / Kuparuk River Sands feet feet Plugs (measured) None feet Junk (measured) 12265' feet Size MD TVD Burst Collapse 20" 110' 110' 1490 470 9-5/8" 6715' 4408' 5750 3090 7" 12365' 7405' 7240 5410 S(~ÁNNED Jut 0 7 2005 11952' - 12095' 7025' - 7145' 12. Stimulation or cement squeeze summary: Intervals treated (measured): , C/L-QÞ- 2-7/8",6.5# L-80 11841' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): None Treatment description including volumes used and final pressure: RBDMS BFl JUL 0 7 2005 13. Representative Daily Average Production or Injection Data Gas-Met Water-Bbl CasinQ Pressure 234 1180 400 219 1371 180 Oil-Bbl Prior to well operation: 754 Subsequent to operation: 738 14. Attachments: 0 Copies of Logs and Surveys run 181 Daily Report of Well Operations 181 Well Schematic Diagram Tubinq Pressure 344 492 15. Well Class after proposed work: o Exploratory 181 Development 0 Service 16. Well Status after proposed work: 181 Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact David Reem, 564-5743 Printed Name Sondra Stewman :----1 Title Technical Assistant o rrrc I N1\to r'\' Prepared By Name/Number: Date V L --Oc;~ondra Stewman, 564-4750 Submit Original Only Tree: Cameron 2 9/16":.. ) Wellhead: 11" x11" 5M FMC Gen 5 wi 11" x 2 7/8" tbg. hng. andw/2 7/8" 8 rd EUE threads top and bottom and 2.5" CIW 'H' bpv profile I- 113' 20" 91.1 ppf, H-40 KOP @ 500' Max. hole angle = 66 deg. from 3700 to TO. Hole angle across perfs = 33 deg. 9 5/8", 40#/ft, L-80 Btrc. I 6750' I M 2 7/8" 6.5 ppf, L-80, 8 rd EUE tbg. ( drift 10 = 2.347", cap. = 0.00592 bpf ) 7" 26 ppf, L-80, NSCC Casing (drift 10 = 6.151", cap. = 0.0383 bpf) (cap wi 2 7/8" tubing inside = .02758 bpf) Stimulation Summary 9/25/95: 149 M# 16/20 Carbolite, flush Perforation Summary Ref log: 09/13/95 GRlCCLlFD "B" Sand SIZE (TVD) SPF INTERVAL 4.5" 5 11,952'-11,960' 6972-6980' 32 gm Alpha Jet charges (EHD = 0,50", TIP = 32.0") @ 135 /45 deg. phasing "An Sand SIZE SPF INTERVAL (TVD) 3-3/8" 6 12008' - 12096' 7020' - 7094' 3-3/8" 6 12008' - 12048' reperf 3-3/8" 6 12054' - 12074' reperf 3-3/8" 6 12075' - 12095' 7128' -7145' MPU F-53 ~ / .- ~ / ~ ~ ~ ~ ~ I ~ .- / ~ ~ / .- / ~ ~ / ~ ~ / / ~ / I I .- .- .- .- I I I I I I, Ii 1-' " ) Orig. KB Elev.= 49.2' (N 27E) Orig. GL elev. = 13.6' RT To Tbg. Spool = 32.62' (N 27E) , Camco 2 7/8" x 1" I 136' sidepocket KBMM GLM . zoo ¡ Camco 2 7/8" x 1" side pocket KBMM GLM 11560' HES "XN" nipple (2.205"10) 1 11701' I 11717'.J (3) Centrilift Pumps, 71 GC41 OQ, 1 11718' Model- (2) GPMTAR (1)GPLTAR 1:1 Intake TVD-' 1 11770' MS-1 Pressure Head Centrilift Tandem Rotary Gas Separator, Model - GRSTXARH6 Centrilift Tandem Seal Section GSB3DB UT/L T AB/HSN PFSNFSA CL5 11776' Centrilift Motor, 266 HP, 1660 volt, 98 amp, Model KMHU/L 11790' W A Phoenix Multi Sensor Sensor TVD = 6928' 11835' 11839' 6 Fin Centralizer 7" Short Joint 11819' 11838' Note: Tree saver rubber (6" x 1" x 1" ) left in the hole 9/25/95 Top of 25 bands & 4 Flat Guards 12265' ~~ ì'..ø_W~ 7" Float collar (PBTO) 7" Float shoe 22 gm. Jumbo Jet "big hole" charges ( EHD = 0.76", TIP = 6.4") @ 60 deg. phasing 112,309' I 12,398' DATE 09/11/95 02/19/96 8/8100 12/20/00 6/14/05 REV. BY JBF DLH GMH M. Linder L. Hulme COMMENTS D &C by Nabors 27E Initial Completion by Nabors 4 ES RWO Nabors 4ES RWO Nabors 4ES ESP Upsize & Add Perf Nabors 4ES MILNE POINT UNIT WELL F-53 API NO: 50-029-22578 BP EXPLORATION (AK) ) ) BP'EXPLORATION Qperations Summary'Report' Paget of3 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-53 MPF-53 WORKOVER Start: Rig Release: Rig Number: 'I:',', "'i,'i'~"r,~,PUQ"q~t~I"; ~/4ì(2,QºQ'''I'' 6/1 O/2'åðSll:2: 1::lk~h8::':; 'i,,'I"'\:"'671412bòs' f¡") " Date From- To Hours Task Code NPT Phase Description of Operations 6/9/2005 11 :00 - 12:00 1.00 RIGD P PRE Rig down from MPF-81 12:00 - 14:00 2.00 RIGU P PRE Move in and spot Sub Base, Pits, Pipe Shed, and Camp at MPF-53. 14:00 - 15:00 1.00 RIGU P PRE Raise and scope Derrick. 15:00 - 16:30 1.50 P PRE Rig-up HCR Valve on annulus. Take on Hot Sea Water in rig Pits. Rig up Lines to Tree. Spot tiger Tank and lay line. Pick-up Lubricator and pull BPV. Lay down same. Pressure test lines to 3,500 psi. 16:30 - 17:00 0.50 KI LL P DECaMP PJSM with All. Prepare for Well Kill Operations. 17:00 - 19:00 2.00 KILL P DECaMP Circulate 140F 8.5 ppg sea water 550 bbls at 4 bpm - 560 psi, returns to trip tank Notice possible communication with quicker than normal returns of hot sea water. Discussed with MPU PE the possibilities of a problem with the Dummy Valve in the GLM at 143'. Slick Line Crew presently on an other job, then will need to get rest before rigging up on our Well. 19:00 - 23:00 4.00 KILL P DECOMP Shut in well and monitor Tbg 600 psi - Annulus 590 psi. Confirm communication. Order out sea water 23:00 - 00:00 1.00 KILL P DECOMP Take on water. Bull head 88 bbls 140F sea water 4 bpm 2000 psi down Tbg and Annulus -( Continued on next day) 6/10/2005 00:00 - 01 :30 1.50 KILL P DECOMP Continue to bull head with 8.5 ppg 140 F sea water total of 353 bbls at 4 bpm - 2000 psi 01 :30 - 02:30 1.00 KILL P DECOMP Monitor well Tbg 350 psi - Annulus 340 psi Blled back to trip tank to 50 psi 106 bbls Shut in and monitor Tbg. 550 - Annulus 540 psi. 02:30 - 05:30 3.00 KILL N DPRB DECaMP Communication problem called out slick line. WO on Slick-Line Unit to arrive on location. 05:30 - 06:00 0.50 KILL N DPRB DECOMP Spot Slick-Line Unit. 06:00 - 08:00 2.00 KILL N DPRB DECOMP Rig up S-Line Unit. Bring Lubricator sections and Tool string to Rig Floor. PJSM. 08:00 - 10:00 2.00 KILL N DPRB DECOMP Rig-up Lubricator Extentions from top of Tree to Rig Floor. Install Wireline BOPs. Rig-up 30' Lubricator. 10:00 - 11 :30 1.50 KILL N DPRB DECOMP RIH with WL Retreiving Tool to pull Dummy Valve from GLM at 136'. However there appears that there is no valve in the pocket. POOH. RIH with Dummy Valve and Setting Tool. Set Dummy Valve in GLM at 136'. Attemp to establish communication through open pocket in GLM at 11,591'. No-Joy. 11 :30 - 15:30 4.00 KILL N DPRB DECOMP Add Oil Jars and an extra Weight Bar to Tool string. RIH with WL Reterving Tool to GLM at 11,591. Latch and pull Dummy Valve from pocket. POOH. Park TS inside of Lubricator. Establish communication through open pocket in bottom GLM at 11,591'. With Much-Joy. 15:30 - 16:30 1.00 KILL N DPRB DECaMP Lay down tool string. Lay down Lubricator, Wireline BOP, and Risier Extentions. Rig down S-Line Unit. 16:30 - 18:00 1.50 KILL P DECOMP Rig-up pump line to tree. Test line at 400/3500 psi. Open Swab Valve and start Well Kill at 3 bpm/960 psi. 4 bpm/1450 psi 18:00 - 19:00 1.00 KILL P DECOMP Continue well kil 4 bpml 1450 psi 8.5# sea water getting good clean returns at 542 bbls pumped 19:00 - 20:00 1.00 KILL P DECOMP Shut in well and monitor Tbg. 330 psi Annulus 330 psi Order out kill wieght fluid 20:00 - 00:00 4.00 KILL P DECOMP Wait on trucks 6/11/2005 00:00 - 02:30 2.50 KILL P DECOMP Wait on trucks Printed: 6/20/2005 11: 1 0:02 AM ) ') BP EXPLORATION Operations Summary Report ¡P~ge 2 of 3 :~ ,.,/ Jf } i... (J~ I,:',:: Z005 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: M PF-53 MPF-53 WORKOVER Start: 6/10/2005 Rig Release: Rig Number: SP4~cj'Pp:t~::;:W4/2000 End: 6/14/2005 Date From- To Hours Task Code NPT Phase Description of Operations 6/11/2005 02:30 - 04:30 2.00 KILL P DECOMP Circulate 9.7 ppg brine 354 bbls around. Had to stop I truck coming to rig had flat tire. 04:30 - 06:00 1.50 KILL P DECOMP Wait on truck. Monitor Well. 06:00 - 07:30 1.50 KILL P DECOMP 9.9 Iblgal Brine arrives from MPU D-Pad Tank Farm. Off load in Pit #2 and water back to 9.7 Iblgal. 07:30 - 09:30 2.00 KILL P DECOMP Finish Well Kill Operations at 4 bpm1300 psi. 9.7lb/gal returns. Monitor Well. Well dead. 09:30 - 10:00 0.50 WHSUR P DECOMP Install and test TWC. 10:00 - 11 :00 1.00 WHSUR P DECOMP Nipple down Production Tree. 11 :00 - 12:30 1.50 BOPSUP P DECOMP Nipple up DS Adaptor, Test Spool, and BOPE. 12:30 - 19:30 7.00 BOPSUP P DECOMP Test BOPE per BP/AOGCC requirements at 250 13,500 psi. Note Blind Rams failed. Change out Rams and re-test. States's right to witness test waived by C. Sheeve. 19:30 - 20:00 0.50 PULL P DECOMP Rig I Up Lubricator I Pull TWC Lay down Lubricator 20:00 - 20:30 0.50 PULL P DECOMP Safety meeting with all personnel 20:30 - 21 :00 0.50 PULL P DECOMP Rig I Up landing Jt wi kill hose I Check back side I Pick up hanger to floor I Monitor well I Well is static 21 :00 - 21 :30 0.50 PULL P DECOMP Rig I Up for pulling ESP completion I Route cable I Spot equipment 21 :30 - 00:00 2.50 PULL P DECOMP Pull ESP completion I Monitoring well / Filling desplacement of pipe 6/12/2005 00:00 - 02:00 2.00 PULL P DECOMP Pulling completion I Monitoring well I Displacement of pipe not taking place, but no flow I Stop at 4,750' pipe out hole. 7,058' of pipe in hole 02:00 - 03:00 1.00 PULL P DECOMP Circulate 9.7 ppg brine arround Tbg. and up Ann. volume 252 bbls I Returns of gas cut Brine. Circulate until clear. End of Tbg at 7,058' 03:00 - 03:30 0.50 PULL P DECOMP Stop Pumps I Monitor I Well slight flow I Confer with Pad operator find F-70 injector well is in operation and other well on production was pinched back at 01 :30 (: Had operator cut off gas injection to F-70 I Wieghted up fluid to 9.9 ppg 03:30 - 05:00 1.50 PULL P DECOMP Circulate 9.9 ppg brine around Tbg. and up Annulus volume 252 bbls I Returns where clean, just slight gas bubbles. Monitor No flow and fluid level slowely dropping. 05:00 - 06:00 1.00 PULL P DECOMP Continue to pull ESP completion. Pipe displacement vs Hole fill now normal. 06:00 - 10:00 4.00 PULL P DECOMP Finish POOH with 2 7/8" ESP Completion. 368 Jts, 2 GLMs, XN-Nipple, and ESP Assembly. 10:00 - 12:00 2.00 PULL P DECOMP Lay down ESP Assembly. Hole ckeck = 10 bbls to fill. Static FL at -340'. 12:00 - 12:30 0.50 PULL P DECOMP Clear and clean Rig floor. 12:30 - 17:00 4.50 PULL P DECOMP TIH with Mule Shoe and 122 Stds from Derrick. PUW = 60K. SOW = 33K. Continue to to single in extra 2 7/8" tbg from Pipe Shed. Tag top of Fill at 12,152' 17:00 - 21 :30 4.50 PULL P DECOMP Reverse circulate from 12,152' to 12,204' No solids recovered I Circulate long way and wash to 12,246' / Reverse circulate 2 volumes back I Recovered a little sand I Fluid loss during circulation wash and reverse 19 bbls IMonitor well static 21 :30 - 23:00 1.50 PULL P DECOMP POH with 2-7/8" work string Monitoring displacement! Lay down 19 singles and 10 Stds. I Hole took 3 bbls I Pull 4 Stds / Hole gave back 3 bbls I Stop Monitor well / Static 23:00 - 00:00 1.00 PULL P DECOMP Circulate 9.9 brine around end of Tbg at 10,403' 372 bbls I Returns very slight gas cut brine toward end I Monitor well I Printed: 6/20/2005 11: 1 0:02 AM ) ) BP EXPLORATION Operations Summary Report Page 3 of 3 Z005 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-53 MPF-53 WORKOVER Start: 6/10/2005 Rig Release: Rig Number: SpÚ8ì[>âie: 8/4/2000 End: 6/14/2005 Date From -To Hours Task Code NPT Phase Description of Operations 6/12/2005 23:00 - 00:00 1.00 PULL P DECOMP Flowing I Continue circulating well and build pits to 10.1 ppg brine Confer with pad operator no wells on injection except in areas that are not supposedly this formation, but the injector F-70i supports a well that is also supported by the well injecting now, so there could be a path there. 6/13/2005 00:00 - 02:00 2.00 PULL P DECOMP Circullate well with 9.9 brine around while building pits I Monitor well I Still slight flow 02:00 - 05:00 3.00 PULL P DECOMP Circulate 10.1 ppg brine around from 10,403' 1407 bbls until 10.1 back I 35 bbls loss during circulation time. I Monitor I Fluid dropping slowly 05:00 - 08:30 3.50 PULL P DECOMP Continue POH with 2-7/8" work string. Stand back in derrick. 08:30 - 10:30 2.00 PERF P DECOMP Nipple down Flow Nipple. Nipple up Shooting Flange. Rig-up SWS E-Line BOP and Lubricator. PJSM with All. 10:30 - 11 :30 1.00 PERF P DECOMP Arm and pick-up 3 3/8" HSD 3406 PJ HMX Perf gun loaded at 6 spf. Test lubricator at 500 psi. Good. 11 :30 - 14:30 3.00 PERF P DECOMP RIH and make Correlation pass from 11.810' to 12,205' Log into position using log 21-Sep-1995 Perforation interval 12,075' - 12,095' I CCL to top shot 7.5' I CCL stop depth 12,067.5' Fire guns with positive indication at surface. POOH 14:30 - 15:30 1.00 PERF P DECOMP RID Schlumberger I Nipple down shooting flange I M/U flow nipple 15:30 - 21 :00 5.50 RUNCOMP RUNCMP Pull ESP pumps from crates I Assemble and service pumps proper size and hoarse power 15.85" O.D. Centralizer, Phoenix MS-1 Sensor, Tandem motor, Lower Tandem motor, Upper Tandem motor, Gas seperator, Lower Tamdem pump, Pump, Discahrge head, and MS-1 Pressure head, make splice between discharge head and 10' pup I Cable routed through 54"sheeve 21 :00 - 00:00 3.00 RUNCOMP RUNCMP Run ESP pump completion on 2-7/8" 6.5# L-80 Tbg in Stds I Pump and checking cable each 2000' interval. Checking hole. 6/14/2005 00:00 - 01 :30 1.50 RUNCOMP RUNCMP Continue running ESP completion on 2-7/8" 6.5# L-80 Tbg in Stds checking conductivity and hole every 2000' 01 :30 - 04:30 3.00 RUNCOMP RUNCMP Esp cable spool splice. Check conductivity and keep hole watch 04:30 - 07:00 2.50 RUNCOrvP RUNCMP Continue RIH with ESP Assembly and 2 7/8" Tubing. 07:00 - 07:30 0.50 RUNCOrvP RUNCMP Pick-up Landing Joint. Make-up Tubing Hanger. Cut ESP Cable and pull over ESP sheave. 07:30 - 09:30 2.00 RUNCOrvP RUNCMP Make upper ESP Cable connector splice. 09:30 - 10:00 0.50 RUNCOrvP RUNCMP Land Tubing Hanger. RILDS. Test 5K. Good. 10:00 - 10:30 0.50 RUNCOrvP RUNCMP Lay down Landing Joint. Set andtest TWC. Drain BOP stack. 10:30 - 12:00 1.50 BOPSUP P RUNCMP Nipple down BOP, Test Spool, and DS Adaptor Flange. 12:00 - 13:30 1.50 WHSUR P RUNCMP Nipple up Adaptor Flange and Production Tree. Test 5K. Good. Perform final ESP Cable check. Good 13:30 - 15:00 1.50 WHSUR P RUNCMP PU Lubricator. Pull TWC. Set BPV. Lay down Lubricator. Secure Production Tree and Cellar. Rig released at 15:00 hrs. Printed: 6/20/2005 11: 1 0:02 AM 8_red e ices., ri- l I i n.g TO: Blair Wondzell FROM: Chris West DATE: October 27, 1995 SUBJECT: MPB-24 Well Suspension APl # 50-029-22642 Blair; Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20- AAC 25.110. As discussed this morning we propose setting three plugs in this well as detailed in the attached form. This will allow us to retain the wellbore for potential future sidetrack or service well use. We would like to keep the well's 9~5/8, x 7" annulus available for the injection of liquid 'wastes. There are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the rig. .. Thank you for your help in this matter. Please call me if I may be of any assistance. Chris West Drilling Operations Engineer Nabors 27E (907)-564-5089 .., -.,...~ DEC,, 1. 4 '~9~R.. -SCANNED NOV Z ~ 200Z :, :.. Oit ~ GasCor~.6°~" ......... ; .-- .. . . -. [.. ANNULAR INJECTION DATA ENTRY SCREEN ii Asset NlilD.e. .......................................... Rig Name ~.~tJ~.9.1'~,~.7.J~ ............................. Inj Well Name JVJ..P...F..-.~. ..................................... Sur Csg Dep §~.g. ................ Cumulative Data Legal Desc ~.0.~8.'.bI~.L~.;~.5.7.;~'.~EL,..~J.e~;..6,.T..1.3~,..B.I.O.E .................................... Research Permit Start ........ .8/..1.~../.9.5 ........ Permit End ....... ~.;~/.~.1/.~1.5. ....... , i~termittaht , Final Freeze Rig cOmpletion Formation Wash Fluids Fluids Well Total Mud/Ctg Freeze ......... l~.5..~ .................. .5.,.6Z.1 ..................... .1.§.5. ....................... ,Z,5. ...................................................... {~.0. ........................ l~.O. ............ Daily .Data == MUd, CtgS, CITI . = : Ir~ Fl'al: ~ Dateof ~~ Rigwash; ~ ~ · F.ree~.' Freeze DeJy I Well i ~njeclion Drlg Mud Fluids Fluids Fluids ~ ~ TolaJ I9i'P'F:'i~ ....................... O'S~ ............. ~ ........................................................................ ~"~;'~ .............. MPF-61 08/20/95 200 :50 250 MPF-61 08/21/95 530 530 M PF-61 08/22/95 315 315 ~-~'~'~ .................. ~§?~5~6'~ ................. i-~'~-~-~ ......................... ~"{'~ ....................... ~'"'~ .............................................................................................................................................. 60 2,095 ........................................... ~ ................................................ · ............................................ . .................................... . ............................................ ~ ............................................. , .............................................. . ..................................... , ................................... MPF-61 08/24/95 200 200 Open 1995 Year End Summary MPF-61 08/25/95 450 450' ...................... ~'~'~-~ ............ ~~ ...... ~ t I ] ~ ~:~ ...................... ~~ ........... ~'~ ~ ......................................... I ...................................... I / .......................... 1~ ~ ll~-61 08/29/95 1,118 1,118 .................................... ~ .......................................................................... hared rvices rilling 900 East Benson Boulevard, MB 8-1 · Anchorage, Alaska 99508 (907) 561-5111 Fax: (907) 564-5193 December 14, 1998 Wendy Mahan Natural Resource Manager Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501-3192 RECEIVED Re: Annular Disposal Information Request Dear Ms. Mahan: DEC 14 1.991] Alaska Oil & Gas Cons, Commission Anchorago On October 28, 1998 you requested an update from Shared service Drilling regarding Annular Disposal Records from July 25, 1995 through preSent time. We compared your list with Our records and are able to provide you with the following data: · Individual Annular Disposal Logs from the SSD database which coincide with the approved wells on your attached AOGCC Annular Log. The SSD records are provided to yoU in the same order as listed on your log. · There were some wells on your list which were not injected into. These wells are identified as follows: · Endicott wells 1-03/P-16, 1-65AV-25, 1-59/0-24 · Exploration well Pete's Wicked #1 · Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30, L-21, K-38, NMP #1 &//2, K-05, K-02, H-07, K-25, K-37, E-17, F-21, K-30, K-34, K-21i, F-66, K-06, K-54, K-33, F-49i, K-18 · PBU Wells E-38, 18-34, 15-42, S-29A, 15-46, B-36, 15-43, 11-38 · The reason many of these annuli were not used is because the waste materials generated.fr°m these wells were injected into other approved annuli. Hopefully the injection logs submitted with this letter will clarify this. In addition, please note that our records show: · The wells listed above in italics were permitted but not used for annular disPosal. · The wells listed above in BOLD were not permitted for annular disposal. Wells drilled · after June 6, 1996 were required by SSD procedure to be permitted with a Sundry Approval (10-403) form. Our records show that no Sundry Approval for Annular Disposal was filed for these wells. Wells drilled between July 25, 1995 and June 6, 1996 were automatically approved for annular disposal with the Permit to Drill. We also provide you with a cumulative report from our database of records from July 25, 1995 through the present. From those records, we show the following wells not listed on your report were used for annular dispoSal: ~C;ANNED NOV ! 3 2002 ,. ,Annular Disposal Letter .', 12/14/98 ! · Endicott wells i-23/O-15, 1-61/Q-20, 2-40/S-22 Exploration well Sourdough #3 - 3%°° ~4 · MilnePointwellsF-06, H-05, H-06, l-13, L-24 - · PBU wells-18-30, 18-31, 14-~,~4},E-34, E-36, G-~A,~dS-33-~'~°~ · hdlvldu~ logs ~e prowded to you for t~ese ~ogs as w~l. · Finally, our records show that the B-24 outer annulus was left open (see attached correspondence) Thank you for the opportunity to provide clarity to these records. If I can be of any further assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental Advisor at 564-4305. Sincerely, Fritz' P. Gunkel Shared Service Drilling Manager FPG/KMT cc: Dave Wallace - HSE Manager (w/out attachments) RECEIVED !4 1998 glaska Oil & ¢~as Cons, ~mmissio~ Anch0rage (3 NNV98 I, e6ed 'uedo /.6/g U~ 96/gU~ gZ 098 g~ff :IOLI:I 'N[~/'0L oas g01?~ BZ~-Odl/;I ' 3i~ s~o¢ .................................................. _. .................................................. -- ................................................... ~ ......................................... .- .............. ; ..................................... : ............................. J ........................................................... i ....................................................................................... uedo 96/6U8~ g6/6U~ 06L cJ(Jg S817'~ 8~'g 'NS~£'0L oeS '-13~ 6L~ "ISN 980~ 170/.17 9i~-Odl~ Bi~i~ s~o¢ uedo Z6/~8/L 961~1L 08~ 08L 008'L 090'8 'NSLL'OL oas '-18~ t~01~8 "ISN 8SOL L~61~ SS-OdiN ~88 s~o¢ uedo' Z6/8 L/~ 96/8 [/t~ 00 L g89 g88 8Sg'B [ 809'6 L 3 [ ~ I:IN8 [.l.'B0'o~S '98~i00 ~ 8'gSN,BP9B BOgS pesolo /-6/9~/L 96/9~/L 9gFL 0B9'I? 98/.'g ~]17i~1 'N6£ '6~ 'oeS '94_-I ,/_90g 'gs_-I,gl?~i~ 98~17 S# q§nop~nos I? I( snlelS pu3 l~elS ezeeJd ezeeJq sp!nlq sp!nld qseM s610 ~ lelO± Luno oseQ le6e9 snlnuuv po!JecJ lesods!Q leu!-I Luno LuJeiUl ~un0 LuJo~ Lun0 IdLuoo Luno §!lJ umo pn~ Luno qideo IleM {Ul 6u!seo B66L ~qLuaoac! Ip, un S66L '~i~/~1~ sauunlo^ uoqo~lul 6U!ll!.~ ~o!~aS p~eq N~dO 86//./g Z6//./S 08 ~ LG'L uedo Z6/0L/t, 96/0Z/I~ 0gL , 0~ ~8 Ll:l 'Nt tJ. '9Z 'O~S GLZ8 L8-CI 6 uo~o~ 3~ s~oqeh :m~ s~oqeh 38~ sJoqeh ldodeE! e^!lelntun0 g66L Jeqmeoec! I!lUn S66L 'S~ seujnlOA uom~,oe[ul Jelnuuv 5U!ll!~,Q ~o!.~S P~J'~eqs Shared Sei~vice Dr..illing Ann1~i~'r injection Volumes July 25, 1995, until December 1998 Cumulative Report Surface Casing Cum Mud Rig Inj Well Depth Legal Desc Cum Total & Ctgs Nabors 28E B-33 3504' 969'SNL, 1898'EWL, Sec 31. T11N, R14E 3,974 2,842 Nabors 28E E-34 3664 168'SNL. 500'WEL, Sec 6, T11N, R14E 9,656 7,228 Nabors 28E E-36 3648 1706'SNL, 822'WEL, Sec 6,T11N, R14E 9,271 4,417 Nabors 28E E-37 3810 3391'NSL, 881~/EL, Sec 6.T11N, R14E 4.695 4,241 Cum Rig Cum Compl Cum Form Cum Inlerm Cum Final Disposal Period Annulus Wash Fluids Fluids Freeze Freeze Start End Status 857 195 80 5/1/96 12/31/96 Broached 1,420 858 40 110 8/23195 12/31/95 Open 1,293 3,096 365 100 7/25195 12/31/95 Open 374 80 9/16~95 1 2/31/95 Open Nabors 28E E-39 3638 3358'NSL, 501'WEL, Sec 6,T11N, R14E 2,250 928 220 1,022 80 8/28/95 12/31/95 Open Nabors 28E G-04A 3509 2917'NSL, 1974'WEL, Sec 12,T11N, R13E 5,937 1,798 1,824 2,315 10/20/95 12/31/95 Open Nabors 28E G-21 3509 2911'NSL 2368'WEL, Sec 12,T11N, R14E 11,430 3,956 3,072 4,270 70 62 9/8/95 12/31/95 Open Nabors 28E S-24 2750 1633'SNL, 4228'WEL, Sec 35,T12N, R12E 20,261 11,773 2,177 5,751 275 285 12/9/95 12/9/96 Open Nabors 28E S-33 2958 1639'SNL, 1487'WEL, Sec 35,T12N, R12E 18,014 6,613 2,431 8,392 270 308 12/1/95 12/1/96 Open Nabors 28E S-42 3077 Sec 35, T12N, R12E 168 100 68 3/13/96 3/13/97 Open Nabors 2ES H-35 3157 4535'NSL, 1266'WEL, Sec 21,T11N, R13E 4,860 3,725 555 480 20 80 10/26/95 12/31/95 Open N.ab.?.r~..~.E.S.. ............. ~.-.~)(~ ..................................... ..3.~57 ............................... 4~.7..~,..N.S!~,...,!.,.,2.6.,~,'..~.L.,...~.c,.,~.!.,~.T_,I~..!,.~!.,....~.?..E' .......................... !..,~.~..2.. ......................................... .8.5..7_ .................................. !..0_0. ................................... .4.!..0. .............................................................................................................................................. ..87. ............ !.?~0!°~ ....................... !..2.!3...!.!9.5. ........................... .0_p..e...n ............. Page 3 STATE OF ALASKA ALASK/-_ _,,IL AND GAS CONSERVATION COMN,... ';ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 46' , , , [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Milne Point Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 2028' NSL, 2572' WEL, SEC. 06, T13N, R10E, UM MPF-53 At top of productive interval 9. Permit Number / Approval No. 195-108 113' NSL, 2456' WEL, SEC. 30, T14N, R10E, UM 10. APl Number At effective depth 50-029-22578-00 269' NSL, 2476' WEL, SEC. 30, T14N, R10E, UM 11. Field and Pool At total depth Milne Point Unit / Kuparuk River 328' NSL, 2484' WEL, SEC. 30, T14N, R10E, UM Sands 12. Present well condition summary Total depth: measured 12425 feet Plugs (measured) true vertical 7429 feet Effective depth: measured 12309 feet Junk (measured) Top of 25 bands and 4 flat guards at 12265' (Approx.) true vertical 7329 feet Casing Length Size Cemented MD TVD Structural Conductor 78' 20" 250 sx Arcticset I (Approx.) 110' 110' Surface 671 5' 9-5/8" 1292 sx PF 'E', 250 sx 'G', 124 sx PF 'E' 6750' 4408' Intermediate Production 12365' 7" 234 sx Class 'G' 12398' 7405' Liner Perforation depth: measured 11952' - 11960', 12008' - 12096' ~":., :~-- .:,.~,. ~, ';,..> true vertical 7025' - 7031', 7072' - 7146' i:'E/3 0 '? 2001 Tubing (size, grade, and measured depth) 2-7/8% 6.5#, L-80 to 11808' Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments ' 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Daily Report of Well Operations [] Oil [] Gas [] Suspended Service 17. I hereby certify that the fore. going is true and correct to the best of my knowledge Signed Terrie Hubble ~'~1 ~_ .~. ~/'-'~ Title Technical Assistant Date Prepared By Name/Number: Terrie Hubble, 564-4628 .. Form 10-404 Rev. 06/15/88 Submit In Duplicate O era i n summary :i:: ii : Report Alaska Oil & Gas Cons. Comn]issinn Anct~orar~e Legal Well Name: MPF-53 - Common Well Name: MPF-53 Spud Date: 8/4/2000 Event Name: WORKOVER Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4 : i :Date :: :From:~To iHOUrs: :Task .... ~0d~i!i~ ~,~ : Phase .... ~:: ~: Description of Operations 12/13/2000 01:00 - 02:30 1.50 MOB ~ PRE Scope and LowerDerrick 02:30 - 03:30 1.00 MOB PRE Move rig from MPU F-05 to MPU F-53 03:30 - 07:00 3.50 RIGU PRE Set herculite and rig mats. Spot sub, pits, and pipe shed. 07:00 - 09:00 2.00 RIGU PRE Raise and scope derrick. Finish Rig up 09:00 - 11:00 2.00 PULL DECOMP Rig ac~pted at 09:00 Hrs. Pick up lubricator and pull back pressure valve. Spot and berm tiger tank Hook up lines to kill well and tested same to 2,800 psi. 11:00 - 14:00 3.00 KILL DECOMP SICP 350 psi and SITP 220 psi Circulated well with 460 bbls. ~ 4 BPM rate at 1,200 psi. Shut down and monitored well. Well static. 14:00 - 15:30 1.50' WHSUR DECOMP Set ~CV and test to 3,500 psi. Nipple down tree 15:30 - 18:00 2.50 WHSUR DECOMP Nipple up BOP and adapter flange 11" x 13 3/8". Rigged up to test BOP equipmnet 18:00 - 21:00 3.00 WHSUR DECOMP Tested BOP equipment to 250 psi/3,500 psi/annular 2,500 psi. ~ Pe~ormed a full BOP test and witness was waived by Chuck Sheve of AOGCC. 21:00 - 21:30 0.50 WHSUR DECOMP Rig down test lines and Lay down test joint ~21:30 -22:00 0.50 WHSUR ,DECOMP Pick up lubricator and pulled ~CV lay down lubricator 22:00 - 23:00 1.00 WHSUR DECOMP Picked up landing joint and make up up in Hanger and Back Out Lock down screws. Pull hanger to the floor. Pick up weight 76 K. Filled Hole with 24 bbls. 23:00 - 23:59 0.98 PULL DECOMP Pulled out of the hole with 2 7/8" completion to 10,390' 12/14/2000 00:00 - 09:00 9.00 PULL DECOMP Pull 2 7/8" Tubing and ESP to suff~. Finding trace of frac sand on ~pipe. Plugged at XN Nipple. 09:00 - 11:00 2.00 PULL DECOMP Check Pump. Break out and lay down ESP Recovered fresh frac sand inside pump. Rigged up to run 3 1/2" drill pipe 11:00 - 14:00 3.00 CLEAN DECOMP Load pipe shed with 3 1/2" drill pipe and make up 6" Reverse circulating basket and scraper 14:00 - 17:00 3.00 CLEAN DECOMP RIH while picking up3 1/2" DP in singles to 3,000 '. 17:00 - 18:00 1.00 CLaN DECOMP Reverse circulate 20 bbl. Hi Vis sweep at 5 3/4 bpm at 800 psi 18:00 - 20:30 2.50 CLaN DECOMP RIH while picking up3 1/2" DP in singles to5,000 '.Reverse circulated 20 bbl sweep at 5,000 '. recovered small amounts of scale 20:30 - 23:00 2.50 CLEAN 'DECOMP RIH while picking up3 1/2" DP in singles to 7,000 '. 23:00 - 23:59 0.98 CLaN DECOMP Reverse circulate 20 bbl. Hi Vis sweep at 5 3/4 bpm at 1300 psi 12/15/2000 00:00 - 02:00 2.00 CLaN ~DECOMP RIH while picking up 3 1/2" DP in singles to 9,000 '. 02:00 - 03:30 1.50 CLEAN DECOMP Reverse circulate 20 bbl. Hi Vis sweep at 5 3/4 bpm at 1300 psi 03:30 - 06:30 3.00 CLaN DECOMP RIH while pJcking up 3 1/2" DP in singles to 11,000 '. 06:30 - 08:00 1.50 CLaN DECOMP Reverse circulate 20 bbl. Hi Vis sweep at 5 3/4 bpm at 1600 psi 08:00 - 08:30 0.50 CLaN DECOMP , RIH while picking up 3 1/2" DP in singles to 11,990 '. 08:30 - 09:00 0.50 CLaN DECOMP Reverse circulate 20 bbl. Hi Vis sweep at 5 3/4 bpm at 1500 psi 09:00 - 10:00 1.00 CLEAN DECOMP RIH while picking up 3 1/2" DP in singles to 12276'. 10:00 - 12:00 2.00 CLaN DECOMP Reverse circulate 20 bbl. Hi Vis sweep at 6 bpm at 1600 psi 12:00 - 14:00 2.00 CLaN DECOMP Displa~ well to clean sea water at 6 bpm at 1500 psi 14:00 - 23:30 9.50 CLEAN DECOMP Monitor well and POH and lay down drill pipe 23:30 - 23:59 0.48 CLEAN DECOMP Lay down scraper and reverse circulating basket 12/16/2000 00:00 - 01:30 1.50 PERF COMP Clear rig floor RU Schlmberger Hold Pre Job safety meeting 01:30 - 02:30 1.00 PERF , COMP RIH with 3 3/8" perforating gun to 11,972' unable to get to bottom 02:30 - 03:30 1.00 PERF COMP POH with 3 3/8" Gun and LD 5 3/4" wheels 03:30 - 04:30 1.00 PERF COMP RIH with 3 3/8" pe~orating gun to 11,972' unable to get to bosom 04:30 - 05:00 0.50 PERF COMP POH with 3 3/8" Gun 05:00 - 06:00 1.00 PERF COMP Rig down Schlumberger 06:00 - 07:00 1.00 CLaN COMP Rig up Floor to run 2 7/8" tubing. Make up Mule shoe on 2 7/8" Tubing 07:00 - 13:00 6.00 CLEAN COMP Trip in the hole with 2 7/8" tubing and 3 1/2" drill pipe to top of fill at t J [ 11,970'. Printed: 1/26/2001 4:23:40 PM :i ;; :; ;: ;OPeratiOnS summ a Re po rt Legal Well Name: MPF-53 Common Well Name: MPF-53 Spud Date: 8/4/2000 Event Name: WORKOVER Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4 Task I Description of Operations 12/16/2000 13:00 - 14:00 1.00 CLEAN I COMP Reverse circulated at 5- 6 BPM rate while attempting to wash hard fill. Circulated long way while attempting to wash hard fill. No success 14:00 - 21:00 7.00' CLEAN COMP Pull out of the hole with with 2 7/8" tubing and mule shoe 21:00 - 21:30 0.50 CLEAN COMP Clear rig floor and rig up to run 3 1/2" drill pipe 21:30 - 23:59 2.48 CLEAN COMP RIH with 5 1/2" mill & 3 1/2" driil pipe while picking up singles 12/17/2000 00:00 - 14:30 14.50 CLEAN COMP rih with 3.5" drill pipe & mill & tag @ 12970' & clean out frac sand to 12212' (Note seen little of anything other than frac sand on returns. 14:30 - 17:00 2.50 CLEAN COMP Reverse in 40-bbl. N-vis sweep followed by filtered seawater to displace well bore & establish static loss rate of 3-bbl. per 5-min. 17:00 - 00:00 7.00 CLEAN l COMP Lay down 3.5" drill pipe 12/19/2000 00:00 - 01:00 1.00 RUNCOM COMP TIH with 2 7/8" tubing and ESP to 11,808' 01:00 - 03:00 2.00 WHSUR COMP PU Hanger and LD Jr./MU Penatrator and test Land Hanger 103:00 - 03:30 0.50 WHSUR COMP Back Out LD Joint/set TWCV and test 2,500 psi 03:30 - 05:00 1.50 WHSUR COMP ND BOP 05:00 - 06:00 1.00 WHSUR COMP Nippled up tree and tested hanger void to 5,000 psi 06:00 - 08:00 2.00 WHSUR COMP Picked up lubricator and pulled TWCV. Installed BPV. Secured celler area. Rig released at 08:00 HRs 12-19-00 FEB 0 Alaska 0il & Gas Co¢~s. Comn~ission Anchorage Printed: 1/26/2001 4:23:40 PM ~ $ BEEN ON OR BEFORE c:LO~M~Ivi.DOC STATE OF ALASKA ALASK, .L AND GAS CONSERVATION COM, SION REPORT OF SUNDRY WELL OPERATION~ 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Puli Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 46' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Milne Point Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 2028' NSL, 2572' WEL, SEC. 06, T13N, R10E, UM MPF-53 At top of productive interval 9. Permit Number / Approval No. 113' NSL, 2456' WEL, SEC. 30, T14N, R10E, UM 195-108 At effective depth 0 RIG Iik]/'~ L 10. ,~0P! 0N2~i.m2b2e5r78.00 269' NSL, 2476' WEL, SEC. 30, T14N, R10E, UM 11. Field and Pool At total depth Milne Point Unit / Kuparuk River 328' NSL, 2484' WEL, SEC. 30, T14N, R10E, UM Sands 12. Present well condition summary Total depth: measured 12425 feet Plugs (measured) true vertical 7429 feet Effective depth: measured 12309 feet Junk (measured) Top of 25 bands and 4 flat guards at 12265' (Approx.) true vertical 7329 feet Casing Length Size Cemented MD TVD Structural Conductor 78' 20" 250 sx Arcticset I (Approx.) 110' 110' Surface 671 5' 9-5/8" 1292 sx PF 'E', 250 sx 'G', 124 sx PF 'E' 6750' 4408' Intermediate Production 12365' 7" 234 sx Class 'G' 12398' 7405' Liner . Perforation depth: measured 11952' - 11960', 12008'- 12096' . . true vertical 7025' - 7031', 7072' - 7146' ~, ;,.~ . ....~, ~;-':i.,i' "' ;,.; ' ;.: :'.' Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80 to 11795' .;:~i.:;,.~.:: .'~¥. ...- .... · ...~:-. .. Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Daily Report of Well Operations [] Oil [] Gas [] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Si~Ined TerrieHubble '-"///~'// ~ Title TechnicalAssistant Date Prepared By Name/Number: Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 Submit In Duplicate Umma Report; Legal Well Name: MPF-53 Common Well Name: MPF-53 Spud Date: 8~4~2000 Event Name: WORKOVER Start: 8/4/2000 End: 81812000 Contractor Name: NABORS Rig Release: 8~8~2000 Group: RIG Rig Name: NABORS 4ES Rig Number: 4 -_~r0~:,2. T° :.' Fi°~rs" A~ivi~_C°de! i~,.. i ~ ii.: ii~i .Description of Operations 8/4/2000 00:00 - 10:30 10.50 DEMOB DECOMP Rig down & move rig from WOA to MPU F-53 10:30 - 16:00 5.50 RIGU DECOMP Rig up & raise derrick & level same. & safe out for rig acceptance. Rig accepted 8/4/2000 1600 hrs. 16:00 - 18:00 2.00~ RIGU DECOMP Rig lines to tiger tank & tree & HCR to annulus 18:00 - 19:00 1.00' WHSUR DECOMP Rig lubricator & pull bpv 19:00 - 22:30 3.50 KILL ~DECOMP Test lines to tree to 2500 psi. & Kill well with 8.5 PPG. brine & Monitor same (well on vacumn.) 22:30 - 23:00 0.50 WHSUR DECOMP :Set twc & test to 3000 from top & attempt to get test from bottom by injecting dn annulus unable to estable a rate. 23:00- 23:59 0.98 WHSUR DECOMP Nipple down tree. 8/5/2000 00:00- 07:00 7.00 BOPSUF DECOMP Nipple up bop's 07:00 - 08:30 1.50 BOPSUF DECOMP test bop to 250 Iow & 3000 high. Test waived by Jeff Jones ^OGC. 08:30 - 09:30 1.00 WHSUR DECOMP Rig lubricator & pull twc. 09:30 - 12:00 2.50 WHSUR DECOMP mu landing it. & pull hanger to floor & lay dn same & rig up equipment to pull esp. assy. 12:00 - 17:00 5.00 PULL DECOMP staart out of hole with esp unable to keep control of loss & spot 40-bbl. pill with material cut in half down annulus & put in place with filling the hole. loss went from 12-bbl. every five minutes to 1-bbl. per hr. 17:00 - 23:59 6.98 PULL DECOMP continue to pooh had to stop & change spools & mag reel 8/6/2000 00:00 - 06:00 6.00 PULL DECOMP pooh & lay dn esp & inspect same found motor burnt & pump locked up. 06:00 - 15:00 9.00 RUNCOI~ COMP mu esp & rih with same to 3492' & hit obstruction & could network through. 15:00 - 19:00 4.00' PULL !COMP pooh & lay dn esp assy. & found that motor was damaged due to iron damage to oil port. 19:00 - 23:59 4.98 FISH COMP ~Mu reverse basket & rih & start pushing same at 3626' 8/7/2000 00:00 - 02:30 2.50 FISH COMP continue to rih with reverse basket pushing junk to bottom or rather past pump setting depth to 11850' 02:30 - 08:30 6.00 CLEAN COMP pooh & lay dn reverse circ. basket & recover 2-bands althought it wasn't the piece of debrie that did the damage to motor we feel like it was 3ushed to bottom. 08:30 - 20:30 12.00 RUNCOI~ COMP make up & rih with esp completion to setting depth of 11795' make one mid-line splice 20:30 - 23:30 3.00 WHSUR COMP make up hanger & mu esp connector & test same & land hanger & enegerize.& back out landing jt. & set twc. 23:30 - 23:59 0.48 WHSUR COMP nipple dn bop 8/8/2000 00:00 - 01:00 1.00 RUNCOI~I COMP Nipple down bop 01:00 - 02:00 1.00 RUNCOI~ COMP nipple up tree & test same to 5000 psi. 02:00 - 03:30 1.50 RUNCOI~ COMP pull twc & set bpv & test same. 03:30 - 06:00 2.50 DEMOB COMP secure tree & cellar & clean pits. (Rig Released @ 0600 Hrs. O8-O8-2OOO) ! Printed: 8/29/2000 2:57:43 PM PERMIT AOGCC Individual Well Geological Materials Inventory DATA T DATA PLUS Page: 1 Date: 02/25/98 RUN RECVD 95-108 6800 ~0000-12288 GR 1 09/28/95 95 - 108 GR/CCL 95-108 PLS ~/~i900-12200 ~000-12288 10/04/95 09/28/95 95-108 7502 95-108 7503 ~RES/GR/CNP/SLD ~Oqq °/~ 3~'~ 10 - 407 ~/COMPLETION DATE DAT'r,'z WE:r_,~ O~S R ?/~//r~"-/ TO ,~? / ~;,/ Are dry ditch samples requzred? ~' yes ~And received? Was the well cored? yes ~ .... Analysis 4 10/17/96 1-2 10/17/96 y/,,~ /.~, / & description received? Are well tests required?~~s ~_~Received? Well is in compliance In¢itial COMMENTS T D !:~ I I--I--I I~ I~ S E I:IL/I C ~:: S WEI,I, LOG TRANSMITTAL To: State of Alaska October 17, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPF-53 & MPF-53 PB 1 AK-MM-950736 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' J"un Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. APl#: 50-029-22578-00 & 50-029-22578-70 5631 Siiverado Way, Suite G · Anchorage, Alaska 99518 ° (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 95-108 3. Address 8. APl Number P. O. Box 196612, Anchora~le, Alaska 99519-6612 5 o- 029-22578 4. Location of well at surface 9. Unit or Lease Name 2028' NSL, 2572' WEL, SEC. 6, T13N, RIOE ~ ............. Milne Point Unit 75' NSL, 2413' WEL, SEC. 30, T14N, RIOE ' :- ./:~ ' i' ~. ...~ Mi/ne Point/Kuparuk River Sands 311' NSL, 2442' WEL, SEC. 30, T14N, RIOE 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 48.40' I ADL 355018 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 07/29/95 08/13/95 02/16/96 N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD):19. DirectionalSurvey I,o.~o,,,.,~os~sv,ot 12,.Th,cknessofPermafrost 12425'MD/7427'TVD 12309'MD/7325'-FVD ~ [] ~o [] N/A feet Mr> 1800' (Approx.) 22. Type Electdc or Other Logs Run ~yro, MWD, I_WD, Gt:FGGL/DEN 23. CASING, UNER AND CEMENTING RECORD SE'I-RNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# NTSOLHE 32' 110' 30" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 35' 6750' 12-1/4" ~292sxPF'E'.250sx'G'. ~24sxPF'~ 7" 26# L-80 33' 12398' 8' 1/2" 234 SX Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and ~5. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Gun Diameter, 5 spf 2-7/8", L-80 11708' N/A MD TVD 11952'-11960' 7018'-7025' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 3-3/8" Gun Diameter, 6 spf Freeze protect w~ 65 bbl diesel MD TVD 12008'-12096' 7065'-7140' Kuparuk '4' Sands Hydraulic fractured w~ 146, 000# of sand 27. PRODUCTION TEST Date First Production JMethod of Operation (Flowing, gas lift, etc.) 03/05/96 I ESP Date of Test Hours Tested ]PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SlZE IGAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED..~ DIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED ~, MAY ~ 0 1996 ORIGINAL.~. . ~. Alaska Oil & 6as Cons. C°mmissi°nAncimrage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity. MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. (Subsea) Top Kuparuk C 11945' 6973' Top Kuparuk B 11951' 6978' Top Kuparuk A3 12007' 7025' Top Kuparuk A2 12022' 7037' Top Kuparuk A 1 12054' 7064' ) 31. LIST OF A'I-FACHMENTS 32. I hereby 'certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~ Title SeniorDrillin_a Engineer Date -~"/'/~'/'¢(~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate 'none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: MP F-53 BOROUGH: NORTH SLOPE UNIT: UNKNOWN FIELD: UNKNOWN LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 07/29/95 06:00 SPUD: RELEASE: 08/16/95 06:00 OPERATION: DRLG RIG: NABORS 27E WO/C RIG: 07/29/95 ( 1) TD: 110' ( 0) 07/30/95 (2) TD: 1561' (1451) 07/31/95 (3) TD: 3668' (2107) 08/01/95 (4) TD: 6104' (2436) 08/02/95 (5) TD: 6725' ( 621) FINISH MIRU MW: 0.0 VIS: 0 MIRU. ESTIMATE SPUD +1000 HRS. JOHN SPALDING (AOGCC) ON LOCATION TO WITNESS DIVERTER SYSTEM FUNCTION TEST. DRILLING MW: 0.0 VIS: 0 FINISH MIRU. LD MWD. DRILLOUT CMT F/38' MD TO 110' MD. SET BACK KELLY. SPUD @ 1500 HRS. 7/29/95. DRILLING FROM 110' MD TO 1461' MD. DRILLING FROM 1461' MD TO 1561' MD. ACCEPT RIG 0600 HRS. 7/29/95 RIH MW: 0.0 VIS: 0 DRILLING FROM 1561' MD TO 1682' MD. DRILLING FROM 1682' MD TO 3668' MD. TAKE SURVEY. CIRC. SWEEP AROUND. FLOWCHECK WELL OK. POOH. TIGHT HOLD FROM 2964' MD TO 2587' MD. DOWNLOAD MWD. FINISH POOH AND CHANGEOUT BITS. RIH. PU KELLY AND WASH THRU SAME. CONTINUE RIH. DRILLING MW: 0.0 VIS: 0 FINISH RIH AFTER BIT TRIP. DRILLING FROM 3668' MD TO 4300' MD. DRILLING FROM 4300' MD TO 5280' MD. SURVEY AND CIRCULATE HOLE CLEAN. FLOWCHECK WELL. OK. PUMP DRY JOB. SET BACK KELLY. SHORT TRIP FROM 5280' TO 3600' MD. HOLE CLEAN. DRILLING FROM 5280' MD TO 5534' MD. DRILLING FROM 5534' MD TO 6104' MD. ATTEMPT WORK STUCK PIPE MW: 0.0 VIS: 0 FLOWCHECK WELL. OK. PUMP DRY JOB. SET BACK KELLY. BEGIN POOH. OK OFF BOTTOM. AT 3500' MD UNABLE TO POOH, ABLE TO SLACKOFF, ROTATE, AND CIRC. CIRC. AT 180 STKS (18 BPM). BEGIN GET GRAVEL BACK, GRAVEL THUMB SIZED TO "SMALL EGG". BEGIN TO GET "FIST SIZED" CHUNKS OF COAL BACK. LARGER SIZED GRAVEL CLEANS UP. ONCE AGAIN "BB" SIZED GRAVEL STILL COMING W/RETURNS ALONG WITH "SUGAR CUBE" SIZED PIECES OF COAL. UNABLE TO GO UP, DOWN, ROTATE OR CIRCULATE. ATTEMPT WORK STUCK PIPE. POSSIBLE JARS STROKING. CONTINUE WORK STUCK PIPE. WELL : MP F-53 OPERATION: RIG : NABORS 27E PAGE: 2 08/03/95 (6) TD: 6725' ( 0) 08/04/95 ( 7) TD: 2000' ( 0) O8/O5/95 (8) TD: 3010' (1010) 08/06/95 (9) TD: 5150' (2140) 08/07/95 (10) TD: 6775' (1625) 08/08/95 (11) TD: 6775' ( 0) 08/09/95 (12) TD: 6775' ( 0) JAR ON FISH MW: 0.0 VIS: 0 WORK SP. CAN'T CIRC. JARS AREN'T WORKING. RU ATLAS WL. RIH. TAGGED UP @ 2544. POOH. MU STRING SHOT. RIH. BACKOFF @ 2516. POOH W/WL. MU FTA %1 & RIH. TAG FISH @ 2516. CBU. GRAVEL SAND & COAL RETURNS. JAR DOWN ON FISH. NO MOVEMENT. NO CIRCULATION. WOC MW: 0.0 VIS: 0 DO A BLIND BACKOFF OF FTA. BACKED OFF SCREW IN SUB. POOH. LD WL TOOLS. MU MULE SHOE & RIH T/2516. CBU. MIX & PUMP KO PLUG ON TOF. STAND BACK 12 STANDS DP. FLUSH OUT DP. CIRC OUT CLABBERD MUD. LD DP & WOC. DRILLING MW: 0.0 VIS: 0 WOC. GREASE ROTARY & DRAWORKS COUPLINGS. WOC. PICK UP BHA %3. ORIENT & TEST MOTOR & MWD. FINISH PICKUP BHA, RIH, TAG UP @1436. LAY DOWN 18 JTS. DP. REAM F/1436 TO 1900. HARD CEMENT @1900. DRILL HARD CEMENT TO 2000. ORIENT AND KICK OFF PLUG. DRILLING MW: 0.0 VIS: 0 DRILL F/3010 TO 3336. PUMP HI-LO SWEEP. CBU. SHORT TRIP TO 2034. DRILL F/3336 TO 4344. MONITOR WELL. SHORT TRIP TO 3006. DRILL F/4344 TO 5150. DRILLING MW: 0.0 VIS: 0 DRILL F/5150 TO 5416. PUMP SWEEP & CBU. SHORT TRIP TO 2248. DRILL F/5416 TO 5766. DRILL F/5766 TO 6110. PUMPED SWEEP. MONITOR WELL. DRILL F/6110 TO 6775. CEMENT CSG MW: 0.0 VIS: 0 CBU AND COND HOLE FOR SHORT TRIP TO HWDP. MONITOR WELL. PUMP DRY JOB. POOH TO HWDP, SLM, RIH. PUMP SWEEP, CIRC. & COND. HOLE. POOH, STAND BACK DP & HWDP. LAY DOWN BHA TO MWD. DOWN LOAD MWD. FINISH LAYING DOWN BHA. RIG UP CSG TOOLS. RUN 166 JTS. 9 5/8 CSG. BRK CIRC. @ 5 BPM. MIX AND PUMP 12.0% LEAD CMT @ 8 BPM RIH T/5626 MW: 0.0 VIS: 0 DISPLACE CMT @ 12 BPM. BUMP PLUG. TEST CASG W/3000PSI. ND FLOWLINE & RISER. STOPE TO CHANGE OUT VACUUM TRUCK DUE T/FAILURE. PERFORM A 40 BBL TOP JOB. NU STARTING HEAD & TBG SPOOL. TEST W/1000PSI 0 LOSS. NU BOPE. INSTALL TEST PLUG & RU T/TEST BOPE. TEST LOW500 T/HIGH 5000 PSI. PULL TEST PLUG & INSTALL WB. MU BHA %4. RIH T/5626. WELL : MP F-53 OPERATION: RIG : NABORS 27E PAGE: 3 08/10/95 (13) TD: 8794' (2019) 08/11/95 (14) TD:10502' (1708) 08/12/95 (15) TD:llT18' (1216) 08/13/95 (16) TD:12250' ( 532) 08/14/95 (17) TD:12425' ( 175) 08/15/95 (18) TD:12425' ( 0) DRILLING MW: 0.0 VIS: 0 RIH T/6633. TAG FC @ 6670. DRILLOUT FC, CMT FS & 10' OF THER NEW HOLE T/6785. CBU. PERFORM LOT. OBTAINED 13.5PPG EMW. DRILL T/6896. CBU. DRILL T/8222. CBU. DRILL T/8794. DRILLING MW: 0.0 VIS: 0 DRILL T/10042. CBU. FSOWCHECK WELL. RU GYRO. RUN F/8222 T/SURF. DRILL T/10502. DRILLING MW: 0.0 VIS: 0 DRILL T/11528. CBU. FLOWCHECK WELL-OK. PUMP DRY JOB. DRILL T/11718. DRILLING MW: 0.0 ViS: 0 DRILL T/12094. WELL FLOWING--SHUT WELL IN. MONITOR F/30 MIN. BETWEEN BLEEDOFFS & ALLOW T/STABILIZE. BLEED DP & CASG T/ T/0PSI. CBU THRU CHOKE @ 40 SPM & 560 PSI @ START, 500 @ END. NO GAS OR HYDROCARBONS ON BU. CHLORIDED CONCENTRATION OK ON BU. OPEN WELL, WELL FLOWING VERY SLOWLY. NO LOSSES WHILE CBU. SHUT WELL IN/CON'T. CBU. WELL STILL HAS A SLIGHT FLOW. WT MUD EVERY 15 MIN. WHILE CIRC. KEPT IT CLOSE T/10.2 PPG. CLOSE KELLY COCK & MONITOR F/30 MIN. FLOW APPEARED T/STOP. DRILL T/12127. WELL FLOWING/SHUT IN. MONITOR WELL. PRESS REMAIN STABLE. EST. LOST 30 BBL MUD WHILE DRILL T/12127. BLEED OFF ANNUL IN 5 BBLS INCREMENTS. OPEN WELL CBU @ 140 SPM. LOST 25 BBLS. CBU SHUT PUMPS DOWN. DRILL T/12250. POOH T/RUN 7" MW: 0.0 VIS: 0 DRILL T/12425. CBU. FLOWCHECK THE WELL. OK. PUMP DRY JOB. POOH T/9-5/8" SHOE. FLOWCHECK THE WELL. OK. RIH T/12051. CBU. POOH T/RUN THE 7" 26#, L-80. LDDP IN MOUSEHOLE MW: 0.0 ViS: 0 RAN CSG T/12396. CMT W/ 20 BBLS WATER/70 BBLS SPACER WT T/ 11.2 PPG. DROP BTTM PLUG. PUMP 48 BBLS G & DROP TOP PLUG. PUMP 80 BBLS DIESEL/5 BBLS WATER, DISPLACE W/386 BBLS OF 8.4 PPG SEAH20. BUMP PLUG T/3500. CIP @16:45 ON 8/15. RD CMT HEAD/LNDG JT. RUN & SET 7" PACKOFF & TEST T/5000/30 MIN. CHANGE T/5" RAMS ND FLOWLINE. NU TREE & TEST. LD DP IN MOUSEHOLE. WELL : PiP F-53 OPERATION: RIG : NABORS 27E PAGE: 4 08/16/95 (19) TD:12425' ( 0) RIG RELEASED MW: 0.0 VIS: 0 FREEZE PROTECT F/45 W/ 106 BBLS DIESEL & F-53 W/100 BBLS DIESEL. CLEAN AREA & RELEASE RIG @ 18:00 HRS ON 8/16. MOVE RIG T/MP F-61 SIGNATURE: (drilling superi~tender~t) SUMMARY OF DAILY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPF-53 Rig Name: 4ES AFE: 3301 18 Accept Date: 02/05/96 Spud Date: Release Date: 02/1 6/96 02/05/96 MIRU FROM MPF-30 TO MPF-53 & BERM & TRIM HERCULITE & SAFE OUT. RU & TEST CSG. ND TREE & PULL FALSE BOWL. NU ADAPTER FLANGE & BOP'S. SET TEST PLUG & TEST BOP'S. RIG ACCEPTED @ 1500 HRS. 02/05/96. 02/06/96 CONT TO RIH WITH BLIND BOX ON WIRELINE & PUSH BALL & ROD TO SEATING POSITION & VERIFY. POOH & RD SLICKLINE. SET PACKER & TEST TUBING T/3500 PSI. OK. BLEED TUBING T/1500 & TEST ANNULUS T/3500. BLEED ANNULUS & TUBING. RIG DOWN LINES TO TREE. PU LUB & SET BPV. SECURE WELL. 02/07/96 ND FAILED CHOKE LINE HOSE. LOAD PIPESHED & WEIGHT UP BRINE. NU NEW CHOKE LINE HOSE. CONT TO TEST. TEST WAIVED BY BOBBY FOSTER. PULL TEST PLUG & SET WB. MU BAKER RETRIEVING TOOL & RIH T/2300'. CIRC OUT FREEZE PROTECT FLUID. PU DRILL SLM & DRIFT. TAG RBP @ 11584'. EQUALIZE & RELEASE PLUG & RIH T/11632'. CIRC & COND BRINE. 02/O8/96 CIRC VISCOUS BRINE AROUND. MONITOR WELL. SLIGHT FLOW. CONT CIRC, SHUT DOWN PUMPS, MONITOR WELL. WELL STATIC. TOH W/3.5" DP, NO RBP, INSPECT RETRIEVING TOOL, NO PROBLEMS. TIH W/BHA #1, RBP RETRIEVING TOOL. CUT 84' & SLIP 42' DRILL LINE. RIH W/3.5" DP & RETRIEVING TOOL. WASH F/11629' T/11723'. REV CIRC. BO'I-i'OMS UP FRAC SAND. REV CIRC & WASH F/11723', TAG RBP @ 11730'. JUNK PLUGGED. TIW VALVE RIG FOR CONV CIRC. PUMP DP VOLUME WASH OVER & CIRC BOTTOMS UP @ 11754'. CIRC BOTTOMS UP THRU CHOKE. MONITOR WELL. WELL FLOWING. CIRC & WEIGHT UP BRINE. TOH. 02/09/96 TOH W/DP & RBP RETRIEVING TOOL. LD BRIDGE PLUG & RET TOOL. MU BHA #3. TIH W/BHA #3 & DP T/11900'. REV CIRC & WASH F/11900' T/11980'. HOLE TIGHT @ 11980'. REV CIRC BOTTOMS UP UNTIL HOLE CLEAN. LD SINGLE, PU KELLY, WORK TIGHT SPOT. REV CIRC & WASH F/11980' T/11988', TAKING WEIGHT, COULD NOT GET PAST. REV CIRC BOTTOMS UP, RETURNS CLEAN, NO SAND. TOH W/BHA #2. LD MULE SHOE & CSG SCRAPER & XO SUBS. MU BHA #3 & TIH. SLIP 42' DRILL LINE. CONT TO TIH W/BHA #3. R£C V[D Page ! MAY ~ 0 1996 d!! & ¢~s Cons. commission 02/10/96 TIH W/DP & BHA #3 T/10650'. MONITOR SHALE SHAKER & EVALUATE. TIH W/DP T/11933'. WASH & ROT F/11933' T/12155'. CIRC. FLUID LOSS THRU PERFS. HOLE WOULD NOT TAKE FLUID. PULL UP T/11840', SWAB WENT OUT ON PUMP. REPAIR PUMP. TIH T/12155'. CONT WASHING & REAMING F/12155' T/12265'. REPAIR RIG SHAKERS. RU & REV CIRC. TOH, LD BHA #3. CLEAN JUNK BASKETS. MU BHA #4, MULE SHOE, JUNK BASKETS & SCRAPER. TIH W/DP. 02/11/96 RIH TAG FILL. RU & REV CIRC FRAC SAND OUT. RIH & TAG FILL. REV CIRC OUT FRAC SAND OUT. CONT RIH T/12251'. REV CIRC & WASH TO PBTD. JUNK PLUGGING STRING, PU KELLY & WASH. REV CIRC TILL CLEAN. POOH, LD DP T/11852'. REV CIRC CASING WASH, DISPLACE WITH CLEAN BRINE, RECIPROCATE PIPE WHILE REV CIRC. MONITOR. STATIC. REV CIRC, FLUID LOSS. TEST BRINE, CLEAN PITS, BUILD NEW BRINE WATER FOR ANOTHER DISPLACEMENT. CUT & SLIP DRILL LINE. 02/12/96 BUILD CLEAN BRINE VOLUME @ BAROID PLANT. TAKE ON FILTERED BRINE, TEST SAMPLE. MIX & PUMP XANVIS SWEEP/SPACER FOLLOWED BY CLEAN BRINE. MONITOR. TOH W/BHA #4. LD DP. CONT TOH, LD DP & BHA #4. PU KELLY, WASH & CLEAN BOP. RETRIEVE WB, SET TEST PLUG, ND RAMS, NU RAMS & TEST. LD TEST JT, RETRIEVE TEST PLUG, RU FLOOR FOR ESP COMPLETION. RU & SERVICE CENTRILIFT ASSY. RUN ESP COMPLETION ON TUBING 02/13/96 PU TUBING, TIH W/ESP COMPLETION. MALE ESP CABLE SPLICE. TIH, PU TUBING, RUN ESP COMPLETION, CHECK ESP & OBSERVED PHD READING GONE. TOH TO ESP CABLE SPLICE, RACK TUBING IN DERRICK, RECHECK ESP CABLE SPLICE, DETERMINE TROUBLE IN PHD. TOH W/ESP COMPLETION, FOUND PUMP PIG TAIL SPLICE TORE LOOSE, ARMOR CABLE DAMAGED. LD ESP PUMP ASSY. 02/14/96 FINISH LD CENTRILIFT PUMP ASSY. RU & TEST BOPE, ANNULAR PREVENTOR WOULD NOT TEST. ND RISER & FLOWLINE, CHANGE ANNULAR ELEMENT, NU RISER & LINE. RU & TEST ANNULAR PREVENTER, INSTALL WB. MU MILL & JUNK BASKETS, RIH W/TUBING OUT OF DERRICK, PU TUBING FROM PIPESHED, RIH T/12250'. CIRC BOTTOMS UP, MIX & PUMP LIQ CSG, XANVIS PILL, BALANCE ACROSS PERFS, MONITOR. TOH, LD TUBING T/11750'. MIX XANVIS SWEEP. REV CIRC WITH CSG WASH, CHASE W/BRINE. 02/15/96 REV CIRC WITH CLEAN BRINE. TOH WITH MILL & JUNK BASKETS. LD MILL, RECOVERED ONE SMALL PIECE OF METAL. PULL WB. MU ESP PUMP ASSY. RIH W/ESP COMPLETION ON TUBING. MAKE REEL TO REEL SPLICE ON ESP CABLE. CONT RIH WITH ESP COMPLETION. PREPARE TO MAKE REEL TO REEL SPLICE ON ESP COMPLETION. RECEIVED Page 2 ~Ay ~ 0 199~ Alaska 0il & Ga~ fi~n~, commissio~ Anchorage 02/16/96 MAKE SPLICE ON ESP CABLE. RIH WITH TUBING, RUN COMPLETION. MU SPLICE @ TUBING HANGER. LAND TUBING, LOCK HANGER DOWN, LD LANDING JT. ND FLOWLINE, RISER & BOP. NU ADAPTER FLANGE & TREE. TEST HANGER. PULL BPV, SET 2-WAY CHECK, TEST TREE. REV CIRC SOURCE WATER & DISPLACE BRINE. DEVELOPED LOW PRESSURE LEAK AT ADJUSTABLE FLANGE ON PRODUCTION TREE. ND LINE, RU LUBRICATOR, SET 2-WAY CHECK, RD LUBRICATOR, ND TREE, OLEAN RING GROOVE, CHANGE OUT RING, NU TREE & TEST. OK. RU LUBRICATOR, PULL 2-WAY CHECK, RD LUBRICATOR. CONT REV CIRC SOURCE WATER & DISPLACE BRINE-. 02/17/96 REV CIRC DISPLACE BRINE WATER OUT OF HOLE WITH SOURCE WATER. FREEZE PROTECT ANNULUS W/65 BBLS DIESEL, FREEZE PROTECT TUBING W/ 15BBL DIESEL. RU LUBRICATOR & SET BPV, SECURE WELL, RD CELLAR & CLEAN PITS. RIG RELEASED @ 1700 HRS., 02/16/96. Page 3 ANCHORAGE ALASKA PAGE 1 BP EXPLORATION MILNE PT / MPF-53 500292257800 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24 /95 DATE OF SURVEY: 081395 MWD SURVEY JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 1987 1953.32 1904.92 2000 1964.85 1916.45 2041 2003.58 1955.18 2136 2091.95 2043.55 2231 2178.25 2129.85 20 42 20 51 20 25 23 13 25 55 N 4.70 E .00 267.19N 15.92E 267.49 N 4.58 E 1.26 271.55N 16.27E 271.85 N 1.57 E 2.77 286.11N 17.06E 286.43 N 2.87 W 3.42 321.47N 16.57E 321.76 N 4.64 W 2.94 360.84N 13.96E 361.07 2326 2262.55 2214.15 2420 2342.93 2294.53 2514 2419.76 2371.36 2610 2497.01 2448.61 2705 2570.54 2522.14 29 18 33 1 36 27 37 41 40 38 N 4.84 W 3.56 404.79N 10.31E 404.92 N 3.17 W 4.06 453.29N 6.95E 453.33 N 8.07 W 4.73 506.27N 1.64E 506.17 N 6.58 W 1.57 564.16N 5.79W 563.87 N .22 W 5.25 623.86N 9.23W 623.48 2799 2639.93 2591.53 2894 2706.76 2658.36 2990 2771.68 2723.28 3084 2833.23 2784.83 3179 2891.68 2843.28 44 0 46 12 48 25 50 40 52 46 N 1.51 E 3.80 687.05N 8.49W 686.67 N .63 W 2.81 754.11N 8.00W 753.72 N .18 W 2.35 824.50N 8.49W 824.08 N .95 W 2.44 896.69N 9.21W 896.24 N 4.17 E 4.81 970.64N 7.08W 970.22 3272 2945.95 2897.55 3369 2999.09 2950.69 3464 3046.73 2998.33 3559 3089.92 3041.52 3654 3130.38 3081.98 55 47 58 10 61 30 64 18 65 24 N 4.74 E 3.30 1045.89N 1.21W 1045.58 N 5.29 E 2.48 1127.38N 5.94E 1127.21 N 6.28 E 3.63 1208.95N 14.22E 1208.96 N 5.54 E 3.03 1292.94N 22.90E 1293.12 N 5.54 E 1.16 1378.75N 31.23E 1379.10 3748 3169.01 3120.61 3844 3207.04 3158.64 3938 3244.63 3196.23 4032 3282.90 3234.50 4126 3321.02 3272.62 66 7 66 52 65 56 66 16 65 51 N 5.01 E .92 1464.22N 39.12E 1464.73 N 3.21 E 1.90 1551.47N 45.38E 1552.11 N .74 E 2.61 1637.49N 48.36E 1638.17 N .97 E .42 1723.89N 49.65E 1724.58 N 1.52 E' .70 1809.77N 51.51E 1810.48 4222 3360.24 3311.84 4316 3398.20 3349.80 4410 3435.91 3387.51 4503 3473.49 3425.09 4598 3511.48 3463.08 66 3 66 9 66 20 66 10 66 43 N .48 E 1.01 1897.67N 53.05E 1898.38 N 1.86 E 1.35 1983.32N 54.80E 1984.06 N 1.45 E .45 2068.98N 57.27E 2069.75 N 2.32 E .87 2154.35N 60.08E 2155.16 N 1.88 E .73 2241.45N 63.27E 2242.32 4693 3549.34 3500.94 4787 3587.80 3539.40 4882 3626.16 3577.76 4974 3663.97 3615.57 5070 3703.81 3655.41 65 59 66 7 65 56 65 39 65 7 N 1.71 E .80 2327.90N 65.98E 2328.80 N 1.53 E .23 2414.49N 68.43E 2415.42 N 2.54 E 1.00 2500.76N 71.50E 2501.74 N .63 E 1.91 2584.86N 73.82E 2585.88 N .59 E .57 2671.84N 74.75E 2672.86 ~/X¥ ?- 0 199 Oil & Gas ConS. SP~-~-~Y-SLrN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 BP EXPLORATION MILNE PT / MPF-53 500292257800 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/9 DATE OF SURVEY: 081395 MWD SURVEY JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD ~ERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL D I RECT I ON RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 5165 3743.97 3695.57 65 10 5260 3784.29 3735.89 64 30 5352 3823.78 3775.38 64 25 5447 3863.68 3815.28 66 9 5546 3904.11 3855.71 65 43 N' 1.35 E .72 2758.55N 76.22E N .44 E 1.13 2844.38N 77.56E N 2.23 E 1.76 2927.01N 79.49E N 1.36 E 1.98 3013.65N 82.20E N .29 W 1.58 3104.20N 83.05E 2759.57 2845.41 2928.06 3014.75 3105.29 5642 3943.70 3895.30 65 3 5737 3984.39 3935.99 64 40 5831 4024.20 3975.80 65 9 5925 4064.13 4015.73 64 29 6021 4105.86 4057.46 63 58 N .04 W .74 3190.66N 82.80E N 2.00 E 1.97 3277.37N 84.28E N .87 E 1.20 3362.41N 86.41E N .95 E .72 3447.35N 87.75E N .14 W 1.15 3533.80N 88.37E 3191.72 3278.44 3363.51 3448.45 3534.90 6114 4145.23 4096.83 6209 4184.61 4136.21 6304 4224.52 4176.12 6397 4264.05 4215.65 6491 4304.09 4255.69 65 50 65 22 64 51 64 53 64 25 N 1.37 E 2.49 3617.89N 89.28E N 1.61 E .54 3704.72N 91.54E N .74 E 1.00 3790.77N 93.30E N 1.46 E .70 3875.05N 94.92E N 1.40 E .51 3959.54N 97.03E 3618.99 3705.85 3791.91 3876.21 3960.73 6585 4343.54 4295.14 66 13 6680 4382.24 4333.84 65 18 6711 4395.49 4347.09 65 5 6780 4424.01 4375.61' 65 33 6875 4463.54 4415.14 65 33 N .40 E 2.13 4045.39N 98.37E N 1.37 E 1.35 4131.35N 99.70E N .23 E 3.34 4160.02N 100.10E N 3.00 E 3.74 4222.06N 101.85E N 1.66 E 1.28 4308.94N 105.39E 4046.59 4132.55 4161.22 4223.29 4310.22 6970 4503.05 4454.65 7066 4542.81 4494.42 7160 4581.86 4533.46 7254 4621.22 4572.82 7349 4660.89 4612.49 65 22 65 26 65 31 65 18 65 11 N 1.70 E ..20 4395.46N 107.92E N 1.02 E .65 4482.31N 109.99E N .19 E .81 4567.90N 110.89E N .53 W .73 4653.90N 110.63E N 1.34 W .78 4739.93N 109.23E 4396.78 4483.65 4569.25 4655.21 4741.18 7444 4701.35 4652.95 7538 4742.83 4694.43 7634 4784.70 4736.30 7729 4826.93 4778.53 7824 4868.86 4820.46 64 64 63 63 63 1 0 54 46 51 N .45 W 1.50 4825.16N 107.90E N 1.34 W .85 4910.26N 106.57E N .42 W .87 4995.96N 105.25E N .34 W .16 5081.94N 104.68E N 1.69 E 1.92 5167.21N 105.68E 4826.37 4911.41 4997.05 5083.01 5168.27 7918 4910.41 4862.01 63 20 8013 4953.37 4904.97 62 53 8108 4996.40 4948.00 63 33 8203 5037.69 4989.29 64 35 8298 5078.62 5030.22 64 26 N 1.20 E .73 5250.89N 107.80E N .70 E .67 5335.61N 109.20E N .41 E .75 5420.87N l10.03E N 3.36 E 3.01 5505.75N 112.83E N 1.61 E 1.67 5591.52N 116.55E 5251.98 5336.71 5421.97 5506.89 5592.73 SP~=~-~¥-SUN DRILLING SERVICES ANCHOR. AGE ALASKA PAGE 3 BP EXPLORATION MILNE PT / MPF-53 500292257800 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/9 DATE OF SURVEY: 081395 MWD SURVEY JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 8390 5117.48 5069.08 8486 5157.55 5109.15 8581 5197.56 5149.16 8678 5237.80 5189.40 8772 5276.63 5228.23 65 44 64 57 65 9 65 49 65 5 N 1.02 E 1.52 5675.18N 118.47E N .68 E .87 5762.48N 119.77E N 1.28 E .61 5848.51N 121.24E N 1.89 E .90 5936.76N 123.68E N 1.89 E .79 6021.75N 126.49E 5676.40 5763.71 5849.75 5938.03 6023.06 8866 5316.76 5268.36 8961 5358.20 5309.80 9052 5398.63 5350.23 9148 5441.27 5392.87 9244 5482.53 5434.13 64 30 63 54 63 12 64 17 64 46 N 1.22 E .90 6106.99N 128.80E N .79 E .74 6192.70N 130.31E N .49 E .84 6274.00N 131.22E N .76 E 1.16 6360.42N 132.16E N 2.86 E 2.04 6446.99N 134.90E 6108.33 6194.06 6275.35 6361.78 6448.39 9338 5522.08 5473.68 9434 5562.97 5514.57 9530 5604.33 5555.93 9623 5644.33 5595.93 9715 5682.67 5634.27 65 64 64 64 66 14 31 7 53 1 N 3.00 E .52 6531.70N 139.23E N 2.39 E .94 6618.83N 143.34E N 1.57 E .88 6704.81N 146.31E N 1.55 E .82 6788.68N 148.59E N 3.68 E 2.44 6872.54N 152.43E 6533.18 6620.38 6706.40 6790.30 6874.23 9810 5721.80 5673.40 9905 5761.63 5713.23 9999 5801.49 5753.09 10091 5841.17 5792.77 10185 5882.-40 58'34.00 65 29 64 52 64 40 64 21 · ~ 63 48 N 3.05 E .83 6959.30N 157.53E N 2.20 E 1.04 7045.33N 161.48E N 1.65 E .57 7129.90N 164.32E N 1.29 E .49 7213.13N 166.46E N .89 E .70 7297.96N 168.07E 6961.08 7047.18 7131.80 7215.05 7299.90 10280 5924.38 5875.98 10375 5966.23 5917.83 10471 6008.17 5959.77 10565 6051.95 6003.55 10658 6098.03 6049.63 63 28 64 13 63 46 61 17 59 13 N 1.29 E .52 7382.69N 169.68E N 2.04 E 1.06 7467.91N 172.16E N 1.49 E .70 7553.88N 174.81E N .49 E 2.78 7638.09N 176.28E N .61 E 2.23 7718.73N 177.05E 7384.64 7469.89 7555.91 7640.12 7720.76 10754 6148.48 6100.08 10849 6201.68 6153.28 10944 6257.75 6209.35 11039 6317.43 6269.03 11134 6380.17 6331.77 56 55 54 57 52 35 49 49 47 19 N .50 E 2.41 7799.67N 177.84E N .67 E 2.08 7878.35N 178.64E N 1.08 E 2.51 7954.87N 179.80E N .65 E 2.92 8029.11N 180.93E N .33 W 2.76 8100.21N 181.14E 7801.70 7880.37 7956.90 8031.15 8102.23 11224 6442.85 6394.45 11319 6511.43 6463.03 11411 6580.33 6531.93 11507 6655.22 6606.82 11603 6732.11 6683.71 44 54 42 23 40 7 37 22 36 37 N 1.64 W 2.86 8165.36N 180.03E N 1.29 W 2.67 8230.76N 178.36E N 1.15 W 2.48 8291.19N 177.07E N .73 W 2.87 8351.29N 176.08E N 2.42 W 1.32 8409.19N 174.49E 8167.34 8232.69 8293.06 8353.13 8410.98 SP?-~--Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE PT / MPF-53 500292257800 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/9 DATE OF SURVEY: 081395 MWD SURVEY JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11695 6806.86 6758.46 35 37 N 3.87 W 1.42 8463.66N 171.51E 11788 6882.80 6834.40 34 40 N 4.89 W 1.19 8516.97N 167.43E 11884 6961.67 6913.27 33 59 N 4.99 W .72 8570.64N 162.79E 11979 7040.85 6992.45 33 7 N 5.88 W 1.04 8622.93N 157.82E 12073 7120.33 7071.93 31 53 N 7.22 W 1.51 8673.26N 152.05E 8465.37 8518.56 8572.12 8624.28 8674.46 12168 7201.63 7153.23 30 49 N 7.88 W 1.18 8722.39N 145.54E 12263 7283.70 7235.30 29 0 N 7.16 W 1.96 8769.21N 139.35E 12310 7324.83 7276.43 27 17 N 7.62 W 3.72 8791.04N 136.53E 12425 7426.84 7378.44 27 17 N 7.62 W .00 8843.20N 129.55E 8723.43 8770.10 8791.85 8843.84 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 8844.15 FEET AT NORTH 0 DEG. 50 MIN. EAST AT MD = 12425 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 1.32 DEG. TIED INTO MPF-53PB1 AT 1987.67' KICK OFF POINT 2000' INTERPOLATED DEPTH 12,425' SDnn'RY-SUN DRILLING SERVICES ANCHOR3~GE ALASKA BP EXPLORATION MILNE PT / MPF-53 500292257800 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/95 DATE OF SURVEY: 081395 PAGE JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 1987 1953.32 1904.92 267.19 N 15.92 E 34.35 2987 2770.10 2721.70 822.71 N 8.49 W 217.57 3987 3264.79 3216.39 1682.66 N 48.95 E 722.88 4987 3669.35 3620.95 2596.77 N 73.96 E 1318.32 5987 4090.97 4042.57 3503.29 N 88.44 E 1896.70 183.22 505.31 595.43 578.38 6987 4510.11 4461.71 4410.85 N 108.38 E 2477.56 7987 4941.64 4893.24 5312.70 N 108.92 E 3046.03 8987 5369.63 5321.23 6216.04 N 130.63 E 3618.04 9987 5796.56 5748.16 7119.49 N 164.02 E 4191.11 10987 6284.59 6236.19 7989.17 N 180.39 E 4703.08 580.86 568.47 572.02 573.06 511.97 11987 7047.79 6999.39 8627.44 N 157.35 E 4939.88 12425 7426.84 7378.44 8843.20 N 129.55 E 4998.16 236.80 58.28 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP,~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 BP EXPLORATION MILNE PT / MPF-53 500292257800 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/95 DATE OF SURVEY: 081395 JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE MEASD VERTICAL DEPTH DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 1987 1953.32 2089 2048.40 2198 2148.40 2310 2248.40 1904.92 267.19 N 15.92 E 34.35 2000.00 303.43 N 17.16 E 41.04 6.69 2100.00 346.71 N 15.03 E 50.04 9.00 2200.00 396.98 N 10.97 E 62.07 12.03 2427 2348.40 2549 2448.40 2676 2548.40 2811 2648.40 2954 2748.40 2300.00 456.86 N 6.74 E 78.73 2400.00 527.23 N 1.32 W 101.31 2500.00 605.21 N 8.82 W 128.38 2600.00 695.28 N 8.30 W 163.01 2700.00 798.25 N 8.41 W 206.57 16.67 22.58 27.07 34.63 43.56 3109 2848.40 3276 2948.40 3468 3048.40 3698 3148.40 3947 3248.40 2800.00 915.37 N 9.29 W 260.62 2900.00 1049.49 N .92 W 328.20 3000.00 1212.03 N 14.56 E 419.76 3100.00 1418.05 N 35.01 E 549.73 3200.00 1645.93 N 48.47 E 699.05 54.05 67.58 91.56 129.97 149.32 4193 3348.40 4441 3448.40 4690 3548.40 4936 3648.40 5176 3748.40 3300.00 1871.00 N 52.82 E 845.37 3400.00 2097.47 N 57.99 E 993.01 3500.00 2325.80 N 65.92 E 1142.40 3600.00 2550.44 N 73.43 E 1288.42 3700.00 2768.12 N 76.44 E 1427.99 146.33 147.63 149.40 146.02 139.57 5409 3848.40 5653 3948.40 5889 4048.40 6122 4148.40 6360 4248.40 3800.00 2979.11 N 81.38 E 1561.56 3900.00 3200.76 N 82.79 E 1704.75 4000.00 3414.38 N 87.21 E 1840.68 4100.00 3624.95 N 89.45 E 1973.83 4200.00 3841.66 N 94.08 E 2112.55 133.57 143.19 135.93 133.15 138.72 6597 4348.40 6838 4448.40 7079 4548.40 7319 4648.40 7551 4748.40 4300.00 4056.41 N 98.45 E 2249.51 4400.00 4275.64 N 104.42 E 2390.59 4500.00 4494.53 N 110.20 E 2531.31 4600.00 4712.91 N 109.86 E 2671.51 4700.00 4921.69 N 106.30 E 2803.04 136.96 141.07 140.72 140.21 131.53 7778 4848.40 8002 4948.40 8228 5048.40 8465 5148.40 8704 5248.40 4800.00 5125.55 N 104.60 E 2930.12 4900.00 5325.90 N 109.08 E 3054.10 5000.00 5528.25 N 114.15 E 3179.91 5100.00 5742.90 N 119.54 E 3316.80 5200.00 5960.36 N 124.46 E 3456.21 127.08 123.97 125.81 136.89 139.41 8939 5348.40 5300.00 6172.70 N 130.03 E 3591.00 134.79 SP~-~-~Y-SUN DRILLING SERVICES AI~CHORAGE ALASKA PAGE BP EXPLORATION MILNE PT / MPF-53 500292257800 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/95 DATE OF SURVEY: 081395 JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE MEASD VERTICAL DEPTH DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 9165 5448.40 5400.00 6375.24 N 132.36 E 3716.90 9400 5548.40 5500.00 6588.28 N 142.06 E 3852.47 9632 5648.40 5600.00 6797.36 N 148.83 E 3984.34 9874 5748.40 5700.00 7017.15 N 160.40 E 4126.11 10108 5848.40 5800.00 7228.19 N 166.80 E 4259.73 125.90 135.57 131.87 141.77 133.63 10334 5948.40 5900.00 7431.00 N 170.85 E 4385.90 10558 6048.40 6000.00 7631.53 N 176.21 E 4510.08 10754 6148.40 6100.00 7799.55 N 177.83 E 4605.69 10928 6248.40 6200.00 7942.64 N 179.57 E 4680.32 11086 6348.40 6300.00 8064.99 N 181.18 E 4738.38 126.17 124.18 95.61 74.63 58.06 11232 6448.40 6400.00 8170.90 N 179.87 E 4784.08 11369 6548.40 6500.00 8264.28 N 177.61 E 4820.96 11498 6648.40 6600.00 8346.02 N 176.15 E 4850.13 11623 6748.40 6700.00 8421.29 N 173.98 E 4875.32 11747 6848.40 6800.00 8493.25 N 169.45 E 4898.61 45.70 36.88 29.18 25.19 23.29 11868 6948.40 6900.00 8561.73 N 163.57 E 4919.95 11988 7048.40 7000.00 8627.83 N 157.31 E 4940.00 12106 7148.40 7100.00 8690.60 N 149.85 E 4958.30 12223 7248.40 7200.00 8749.72 N 141.81 E 4974.76 12336 7348.40 7300.00 8803.09 N 134.91 E 4988.34 21.35 20.04 18.31 16.46 13.58 12425 7426.84 7378.44 8843.20 N 129.55 E 4998.16 9.82 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MiLNE PT / MPF-53PB1 500292257870 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24 /95 DATE OF SURVEY: 080295 MWD SURVEY JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES VERT. DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 0 .00 -48.40 123 123.30 74.90 224 224.76 176.36 313 313.60 265.20 401 401.83 353.43 0 0 0 10 0 18 0 26 0 31 N .00 E .00 .00N .00E .00 S 56.17 E .15 .liS .16E -.10 N 86.59 E .20 .18S .57E -.17 N 88.74 E .15 .16S 1.15E -.13 N 59.27 E .29 .05N 1.83E .10 494 494.80 446.40 583 583.33 534.93 673 673.91 625.51 763 763.70 715.30 853 853.55 805.15 0 24 0 30 1 21 3 11 4 35 N 77.00 E .19 .34N 2.52E .40 S 76.24 E .27 .32N 3.21E .40 N 31.28 E 1.43 1.14N 4.16E 1.23 N 7.12 E 2.26 4.52N 5.01E 4.64 N 4.10 E 1.57 10.60N 5.58E 10.73 946 946.21 897.81 1041 1040.19 991.79 1135 1133.48 1085.08 1229 1226.02 1177.62 1323 1318.69 1270.29 6 10 7 24 9 1 10 0 10 38 N 1.58 E 1.73 19.33N 5.99E 19.46 N 3.08 E 1.31 30.51N 6.46E 30.66 N 4.41 E 1.73 43.96N 7.35E 44.12 N 2.49 E 1.09 59.44N 8.27E 59.62 N 3.49 E .71 76.29N 9.16E 76.48 1416 1409.05 1360.65 1511 1502.11 1453.71 1607 1594.60 1546.20 1702 1685.01 1636.61 1796 1774.38 1725.98 12 34 14 18 16 30 18 0 19 27 N 1.65 E 2.14 94.84N 9.96E 95.04 N .22 E 1.84 117.08N 10.31E 117.29 N 1.16 W 2.32 142.57N 10.08E 142.77 N .78 E 1.69 170.65N 10.01E 170.83 N 3.33 E 1.77 200.92N ll.12E 201.13 1892 1864.51 1816.11 1987 1953.24 1904.84 2082 2041.84 1993.44 2177 2129.11 2080.71 2271 2214.43 2166.03 20 40 20 42 21 51 23 4 26 10 N 4.25 E 1.30 233.77N 13.30E 234.01 N 4.70 E .17 267.17N 15.91E 267.47 N 3.78 E 1.26 301.57N 18.46E 301.92 N 2.55 E 1.39 337.60N 20.44E 337.98 N .78 E 3.39 376.70N 21.54E 377.09 2364 2297.53 2249.13 2461 2382.04 2333.64 2556 2462.05 2413.65 2650 2538.03 2489.63 2745 2612.17 2563.77 28 1 30 53 34 26 37 17 40 9 N .81 E 1.97 419.22N 22.13E 419.62 N .51 E 2.97 466.96N 22.68E 467.35 N 1.71 E 3.79 518.25N 23.70E 518.66 N 1.99 E 3.04 573.15N 25.47E 573.58 N 1.83 E 3.01 632.56N 27.45E 633.02 2839 2682.88 2634.48 2933 2750.56 2702.16 3029 2815.97 2767.57 3123 2876.63 2828.23 3216 2932.64 2884.24 42 25 45 25 48 25 51 54 53 42 N 1.82 E 2.42 694.62N 29.43E 695.11 N 1.41 E 3.21 759.79N 31.26E 760.31 N 1.65 E 3.13 829.73N 33.13E 830.27 N .38 E 3.82 902.41N 34.40E 902.97 N 1.27 W 2.41 976.20N 33.81E 976.72 RECEIVED MAY 2 0 199t; Alaska Oil & ~aa (~n~. OomlTIJsltjorl Anchorage SPERRY-SUN DRILLING SERVICES ANCHOR3iGE ALASKA PAGE 2 BP EXPLORATION MILNE PT / MPF-53PB1 500292257870 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24 /95 DATE OF SURVEY: 080295 MWD SURVEY JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES VERT. DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 3311 2986.39 2937.99 3403 3034.38 2985.98 3498 3078.68 3030.28 3592 3118.42 3070.02 3687 3157.83 3109.43 57 17 60 10 64 1 65 37 65 26 N .40 W 3.85 1054.41N 32.69E 1054.88 N .73 E 3.29 1133.43N 32.93E 1133.88 N .12 E 4.12 1217.08N 33.54E 1217.53 N .59 E 1.76 1301.63N 34.06E 1302.07 N .22 E .40 1388.22N 34.68E 1388.65 3781 3197.36 3148.96 3877 3238.73 3190.33 3971 3278.71 3230.31 4066 3317.54 3269.14 4161 3355.87 3307.47 64 56 64 8 65 31 66 11 66 15 N .30 E .53 1473.76N 35.06E 1474.18 N .08 W .91 1560.66N 35.23E 1561.05 N .82 E 1.71 1645.77N 35.79E 1646.16 N .59 E .73 1732.40N 36.85E 1732.79 N .09 E .49 1819.40N 37.37E 1819.78 4257 3394.52 3346.12 4352 3433.60 3385.21 4447 3473.11 3424.71 4542 3512.88 3464.48 4636 3552.93 '3504.53 65 54 65 32 65 25 65 8 64 24 N .09 W .42 1906.54N 37.37E 1906.90 N .02 E .39 1993.18N 37.32E 1993.51 N .28 W .31 2079.80N 37.12E 2080.10 N .10 E .47 2166.21N 36.98E 2166.48 N .37 E .83 2251.21N 37.33E 2251.47 4730 3592.75 3544.35 4825 3631.94 3583.54 4921 3671.92 3623.52 5016 3712.14 3663.74 5110 3750.91 3702.51 65 41 65 30 65 8 64 49 66 16 N .62 E 1.39 2336.77N 38.07E 2337.03 N .76 E .24 2423.14N 39.11E 2423.40 N .97 E .43 2510.14N 40.42E 2510.41 N 1.01 E .34 2596.30N 41.91E 2596.58 N 1.18 E 1.57 2681.54N 43.54E 2681.83 5204 3788.93 3740.53 5296 3826.48 3778.08 5384 3862.65 3814.25 5488 3906.35 3857.95 5583 3947.30 3898.90 66 9 65 48 65 19 65 1 63 58 N .76 E .43 2767.79N 45.00E 2768.09 N .53 E .44 2852.02N 45.95E 2852.33 N .74 E .59 2931.61N 46.83E 2931.92 N .49 E .35 3026.08N 47.85E 3026.38 N .42 E 1.11 3111.96N 48.53E 3112.25 5681 3990.42 3942.02 5776 4030.74 3982.34 5871 4068.98 4020.58 5967 4107.94 4059.54 6061 4146.73 4098.33 63 36 66 30 66 8 65 48 65 42 N .34 E .39 3199.55N 49.11E 3199.83 N 2.35 E 3.58 3286.23N 51.16E 3286.54 N 2.49 E .41 3373.36N 54.85E 3373.73 N 2.89 E .52 3460.66N 58.95E 3461.10 N 2.98 E .13 3546.66N 63.36E 3547.18 6155 4185.66 4137.26 6250 4225.58 4177.18 6345 4265.91 4217.51 6439 4305.42 4257.02 6533 4343.89 4295.49 65 13 64 58 64 33 65 53 65 46 N 2.17 E .94 3631.89N 67.19E 3632.47 N 2.49 E .40 3717.84N 70.69E 3718.48 N 1.58 E .98 3803.35N 73.73E 3804.04 N 2.59 E 1.72 3888.87N 76.85E 3889.61 N 2.46 E .18 3974.51N 80.62E 3975.31 RECEIVED SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 BP EXPLORATION MILNE PT / MPF-53PB1 500292257870 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/95 DATE OF SURVEY: 080295 MWD SURVEY JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 6627 4382.92 4334.52 65 24 N 3.22 E .83 6646 4390.66 4342.26 65 13 N 2.51 E 3.62 6725 4423.59 4375.19 65 13 N 2.51 E .03 4060.41N 4077.22N 4148.52N 84.88E 4061.29 85.72E 4078.11 88.85E 4149.46 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4149.47 FEET AT NORTH 1 DEG. 13 MIN. EAST AT MD = 6725 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 1.32 DEG. SPERRY-SUN DRILLING SERVICES ANCHOILAGE Af_JtS KA PAGE BP EXPLOR3tTION MILNE PT / MPF-53PB1 500292257870 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/95 DATE OF SURVEY: 080295 JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SI/B-SEA TOTAL MEASD VERTICAL VERTICAL RECTkNGU~ COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -48.40 .00 N .00 E .00 1000 998.93 950.53 25.16 N 6.17 E 1.07 2000 1964.78 1916.38 271.51 N 16.27 E 35.22 3000 2796.38 2747.98 808.01 N 32.52 E 203.62 4000 3290.41 3242.01 1671.46 N 36.15 E 709.59 1.07 34.16 168.39 505.97 5000 3705.11 3656.71 2581.34 N 41.65 E 1294.89 6000 4121.25 4072.85 3490.22 N 60.44 E 1878.75 6725 4423.59 4375.19 4148.52 N 88.85 E 2301.41 585.30 583.86 422.66 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. FT. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE PT / MPF-53PB1 500292257870 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/95 DATE OF SURVEY: 080295 JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -48.40 .00 N .00 E .00 48 48.40 .00 .00 N .00 E .00 148 148.40 100.00 .15 S .23 E .00 248 248.40 200.00 .17 S .70 E .00 348 348.40 300.00 .15 S 1.42 E .00 .00 .00 .00 .00 448 448.40 400.00 .25 N 2.19 E .01 548 548.40 500.00 .40 N 2.91 E .01 648 648.40 600.00 .62 N 3.84 E .02 748 748.40 700.00 3.68 N 4.91 E .09 848 848.40 800.00 10.19 N 5.55 E .31 .0O .00 .01 .07 .22 949 948.40 900.00 19.57 N 5.99 E .76 1049 1048.40 1000.00 31.58 N 6.51 E 1.48 1150 1148.40 1100.00 46.33 N 7.53 E 2.58 1252 1248.40 1200.00 63.38 N 8.44 E 4.03 1354 1348.40 1300.00 81.86 N 9.50 E 5.73 .45 .73 1.10 1.45 1.70 1456 1448.40 1400.00 103.62 N 10.22 E 8.08 1559 1548.40 1500.00 128.90 N 10.35 E 11.23 1663 1648.40 1600.00 158.75 N 9.84 E 15.60 1769 1748.40 1700.00 191.76 N 10.58 E 20.91 1875 1848.40 1800.00 227.71 N 12.85 E 27.21 2.35 3.15 4.37 5.32 6.30 1982 1948.40 1900.00 265.35 N 15.77 E 34.09 2089 2048.40 2000.00 304.20 N 18.63 E 41.42 2198 2148.40 2100.00 345.96 N 20.78 E 49.82 2308 2248.40 2200.00 393.43 N 21.77 E 60.53 2422 2348.40 2300.00 447.29 N 22.48 E 74.13 6.89 7.33 8.40 10.71 13.60 2540 2448.40 2400.00 509.00 N 23.44 E 91.67 2663 2548.40 2500.00 581.11 N 25.75 E 115.00 2792 2648.40 2600.00 663.36 N 28.44 E 144.52 2930 2748.40 2700.00 757.64 N 31.21 E 182.02 3079 2848.40 2800.00 867.47 N 33.99 E 230.63 17.54 23.34 29.52 37.50 48.61 3243 2948.40 2900.00 998.10 N 33.38 E 295.20 3432 3048.40 3000.00 1158.53 N 33.20 E 384.34 3664 3148.40 3100.00 1367.59 N 34.60 E 516.16 3899 3248.40 3200.00 1580.62 N 35.21 E 651.50 4143 3348.40 3300.00 1802.42 N 37.34 E 794.83 64.57 89.15 131.82 135.34 143.33 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLOI{ATION MILNE PT / MPF-53PB1 500292257870 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/24/95 DATE OF SURVEY: 080295 JOB NUMBER: AK-MM-950736 KELLY BUSHING ELEV. = 48.40 FT. OPERATOR: BP EXPLOP~ATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 4387 3448.40 3400.00 2025.71 N 37.33 E 939.49 144.66 4625 3548.40 3500.00 2241.75 N 37.27 E 1077.56 138.07 4865 3648.40 3600.00 2459.23 N 39.60 E 1216.95 139.39 5103 3748.40 3700.00 2675.84 N 43.43 E 1355.57 138.62 5350 3848.40 3800.00 2900.61 N 46.43 E 1501.60 146.03 5585 3948.40 3900.00 3114.20 N 48.55 E 1637.47 135.87 5820 4048.40 4000.00 3326.81 N 52.83 E 1772.53 135.06 6066 4148.40 4100.00 3550.36 N 63.55 E 1917.66 145.13 6304 4248.40 4200.00 3766.57 N 72.71 E 2056.06 138.40 6544 4348.40 4300.00 3984.52 N 81.05 E 2196.02 139.96 6725 4423.59 4375.19 4148.52 N 88.85 E 2301.41 105.39 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS gyro/data Date~ B.P. EXPLORATION MILNE POINT F PAD WELL NUMBER MPF 53 MILNE POINT FIELD, ALASKA _ Gyro Drillpipe Survey Survey date '_10 August 1995 Job number · AK0895G285 RECEIVED MAY 2 0 1996 Alaska Oil & Gas Cons. Commission Anchorage SR285.DOC Gyrodata Incorporated P,O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 August 24, 1995 Ms. Terrie Hubble B.P. Exploration Prudhoe Bay Drilling Department 900 E. Benson Blvd. Anchorage, AK 99508 MB 12-1 Re; Milne Point Well # MPF 53, F Pad, Milne Point Field, Alaska Dear Ms. Hubble, Enclosed please find one (1) original and three copies (3) of the completed survey of Well #MPF 53 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the furore. Since.~r.rely. v Operations Manager RS/gr Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER: AK0895G285 1. DISCUSSION, SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR285.DOC gyro/data 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR285.DOC gyro/data DISCUSSION JOB NUMBER ' AK0895G285 Tool 080 was run in Milne Point F Pad Well Number MPF 53 on ATLAS 5/16" Wireline inside drillpipe to a depth of 9205 feet. The survey was run without problems. SR285.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER: AK0895G285 The data for this survey and the calculations for this survey were obtained and performed by me according to the standards and procedures as set forth by Gyrodata Incorporated, and are true and correct to the best of my knowledge. TOM STODDARD SURVEY ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Incorporated. This report represents a true and correct directional survey of this well based on the original data obtained at the wellsite. Checked by: TIM ANDERSON- TOM STODDARD OPERATIONS ENGINEER SR285.DOC gyro/data 2. SURVEY DETAILS SR285.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0895G285 CLIENT: B.P. EXPLORATION RIG: NABORS 27 E LOCATION: MILNE POINT F PAD WELL: MPF 53 LATITUDE: 70.505° N LONGITUDE: 149.5° W SURVEY DATE: 10 AUGUST 1995 SURVEY TYPE : 2 1/4" GYRO MULTISHOT DEPTH REFERENCE: NABORS 27 E RKB MAX. SURVEY DEPTH: 9205 FEET SURVEY TIED ONTO: N/A SURVEY INTERVAL: UTM CO-ORDINATES: 100 FEET (0-7505, 7805-8405, 9005-9205 FEET) 30 FEET (7505-7805, 8405-9005 FEET) TARGET DIRECTION: 1.32° GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: STODDARD SR285.DOC gyro/data 3. OUTRUN SURVEY LISTING SR285.DOC · A Gyro da t a D i r e c t i on a i Survey for B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, DRILLPIPE Location: F PAD, MILNE POINT FIELD, ALASKA Job Number: AK0895G285 Run Date: 10-Aug-95 21:45:03 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 46 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 1.320 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference ' A G y r o d a t a D i B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, DRILLPIPE Location: F PAD, MILNE POINT FIELD, ALASKA Job Number: AK0895G285 rectional Survey MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. 0.0 0.00 0.00 0.0 0.0 -46.0 0.00 0.0 0.0 MEASURED DEPTHS REFERENCED TO NABORS 27 E R.K.B. 0.0 - 9205.0 FEET; GYRODATA GYRO SURVEY RUN IN DRILLPIPE. Page 1 HORIZONTAL COORDINATES feet 0.00 N 0.00 E 105.0 .46 89.04 105.0 .0 59.0 205.0 .27 47.92 205.0 .2 159.0 305.0 .37 41.56 305.0 .6 259.0 405.0 .39 44.14 405.0 1.1 359.0 505.0 .44 98.19 505.0 1.3 459.0 605.0 .35 38.79 605.0 1.5 559.0 705.0 1.46 20.99 705.0 2.9 659.0 805.0 3.58 5.11 804.9 7.3 758.9 905.0 4.99 .94 904.6 14.7 858.6 1005.0 6.56 .76 1004.1 24.8 958.1 1105.0 7.76 2.29 1103.3 37.2 1057.3 1205.0 9.28 3.04 1202.2 52.0 1156.2 1305.0 10.39 2.39 1300.7 69.1 1254.7 1405.0 11.59 1.38 1398.9 88.2 1352.9 1505.0 14.48 .88 1496.3 110.7 1450.3 1605.0 16.47 357.62 1592.7 137.4 1546.7 1705.0 17.74 357.80 1688.2 166.7 1642.2 1805.0 19.06 1.89 1783.1 198.3 1737.1 1905.0 20.37 3.72 1877.3 232.0 1831.3 2005.0 21.57 2.07 1970.6 267.8 1924.6 .44 .31 .10 .03 .38 .40 1.13 2.21 1.44 1.57 1.21 1.53 1.12 1.21 2.89 2.18 1.27 1.85 1.45 1.34 .4 89.0 .01 N .42 E 1.0 80.2 .17 N 1.00 E 1.5 67.6 .57 N 1.39 E 2.1 60.2 1.05 N 1.83 E 2.7 63.1 1.24 N 2.45 E 3.3 4.6 8.4 15.4 25.2 37.5 52.3 69.3 88.3 110.8 137.4 166.8 198.3 232.0 267.8 64.7 1.43 N 3.01 E 52.0 2.86 N 3.67 E 31.6 7.16 N 4.40 E 18.0 14.61 N 4.75 E 11.2 24.67 N 4.90 E 8.0 37.13 N 5.24 1 6.5 51.92 N 5.94 R 5.6 68.98 N 6.74 E 4.8 88.03 N 7.36 E 4.0 110.57 N 7.79 E 3.1 2.1 1.8 1.9 2.1 137.24 N 7.40 E 166.63 N 6.23 E 198.18 N 6.18 E 231.88 N 7.85 E 267.62 N 9.64 E A Gyro da t a D i r e c t i ona 1 S u rye y B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, Location: F PAD, MILNE POINT FIELD, Job Number: AK0895G285 DRILLPIPE ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg~ deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. H O R I Z O N T A L COORDINATES feet 2105.0 21.96 358.06 2063.5 2205.0 24.73 354.68 2155.3 2305.0 28.27 354.33 2244.8 2405.0 32.09 354.52 2331.2 2505.0 35.94 354.11 2414.1 304.8 2017.5 344.3 2109.3 388.6 2198.8 438.5 2285.2 494.0 2368.1 1.53 304.8 1.8 3.08 344.3 1.2 3.53 388.6 .4 3.83 438.7 359.7 3.85 494.4 359.1 304.69 N 9.67 E 344.21 N 7.10 388.62 N 2.82 438.65 N 2.06 W 494.30 N 7.61 W 2605.0 37.83 352.48 2494.1 2705.0 40.49 357.41 2571.6 2805.0 43.53 356.86 2645.9 2900.0 45.78 359.32 2713.5 3005.0 48.17 356.74 2785.2 553.4 2448.1 616.1 2525.6 682.9 2599.9 749.5 2667.5 826.1 2739.2 2.13 554.1 358.5 4.10 617.1 358.1 3.06 684.0 358.0 2.98 750.8 358.0 2.90 827.5 358.0 553.90 N 14.64 W 616.76 N 20.13 W 683.60 N 23.48 W 750.32 N 25.68 W 827.01 N 28.35 W 3105.0 50.75 358.19 2850.2 3205.0 53.26 2.19 2911.7 3305.0 56.27 3.19 2969.4 3405.0 59.22 3.16 3022.8 3505.0 62.41 5.71 3071.5 902.0 2804.2 980.7 2865.7 1062.4 2923.4 1146.9 2976.8 1234.0 3025.5 2.81 903.5 358.0 4.03 982.2 358.2 3.11 1063.6 358.5 2.95 1147.9 358.9 3.89 1234.8 359.3 902.92 N 31.69 W 981.70 N 31.38 W 1063.28 N 27.54 W 1147.70 N 22.85 W 1234.72 N 16.08 W 3605.0 64.88 4.90 3115.9 3705.0 65.62 5.15 3157.8 3805.0 66.31 3.29 3198.5 3905.0 66.44 2.72 3238.6 4005.0 66.34 1.43 3278.7 1323.4 3069.9 1414.0 3111.8 1505.2 3152.5 1596.8 3192.6 1688.4 3232.7 2.57 1324.0 359.7 .78 1414.4 .0 1.83 1505.5 .3 .54 1597.0 1.18 1688.6 .5 1323.94 N 7.80 ' 1414.40 N .16 E 1505.47 N 6.88 E 1596.96 N 11.68 E 1688.53 N 15.00 E 4105.0 66.26 .26 3318.9 4205.0 65.92 359.95 3359.4 4305.0 66.28 1.42 3399.9 4405.0 66.34 .75 3440.1 4505.0 66.54 1.11 3480.1 1780.0 3272.9 1871.4 3313.4 1962.8 3353.9 2054.4 3394.1 2146.0 3434.1 .08 1780.2 .5 .44 1871.6 .5 .39 1963.0 .5 .61 2054.6 .5 .38 2146.2 .6 1780.08 N 16o35 E 1871.50 N 16.52 E 1962.91 N 17.61 E 2054.47 N 19.35 E 2146.12 N 20°84 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, Location: F PAD, MILNE POINT FIELD, Job Number:. AK0895G285 DRILLPIPE ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL C 0 0 R D I N A T.E S feet 4605.0 66.89 1.86 3519.6 4705.0 66.36 .78 3559.3 4805.0 65.94 1.41 3599.7 4905.0 65.88 .04 3640.5 5005.0 65.37 1.27 3681.8 2237.9 2329.7 2421.1 2512.4 2603.5 3473.6 3513.3 3553.7 3594.5 3635.8 .78 2238.1 .6 1.13 2329.9 .6 .71 2421.3 .6 1.25 2512.6 .6 1.23 2603.7 .6 2237.95 N 23.22 E 2329.71 N 25.34 ' 2421.16 N 27.08 2512.44 N 28.24 E 2603.51 N 29.27 E 5105.0 65.47 .71 3723.4 5205.0 64.99 .52 3765.3 5305.0 64.28 .09 3808.1 5405.0 65.00 .64 3851.0 5505.0 66.02 359.73 3892.4 2694 2785 2875 2965 3056 .4 .2 .6 .9 .9 3677.4 3719.3 3762.1 3805.0 3846.4 .52 2694.6 .7 .50 2785.4 .7 .82 2875.8 .6 .88 2966.1 .6 1.32 3057.1 .6 2694.43 N 30.84 E 2785.23 N 31.82 E 2875.59 N 32.30 E 2965.95 N 32.88 E 3056.95 N 33.17 E 5605.0 65.73 .16 3933.3 5705.0 65.16 357.95 3974.9 5805.0 64.87 .14 4017.1 5905.0 64.65 .&3 4059.7 6005.0 64.36 .39 4102.8 3148 3239 3329 3420 3510 .1 .0 .6 .0 .3 3887.3 3928.9 3971.1 4013.7 4056.8 .49 3148.4 .6 2.09 3239.3 .6 2.01 3329.9 .5 .34 3420.4 .5 .29 3510.6 .5 3148.21 N 33.08 E 3239.14 N 31.58 E 3329.77 N 30.07 E 3420.22 N 30.52 E 3510.48 N 31.16 E 6105.0 66.05 .33 4144.7 6205.0 65.77 359.37 4185.5 6305.0 65.01 359.59 4227.2 6405.0 64.64 .30 4269.7 6505.0 64.50 .63 4312.7 3601 3692 3783 3873 3963 .0 .3 .2 .6 .9 4098.7 4139.5 4181.2 4223.7 4266.7 1.69 3601.4 .5 .93 3692.7 .5 .78 3783.6 .5 .74 3874.1 .5 .33 3964.4 .5 3601.26 N 31.73 3692.55 N 31.50 3783.46 N 30.67 E 3873.96 N 30.58 E 3964.27 N 31.31 E 6605.0 66.13 .06 4354.4 6705.0 65.66 .33 4395.3 6805.0 65.93 .23 4436.3 6905.0 65.77 .77 4477.2 7005.0 65.46 1.21 4518.5 4054.8 4146.0 4237.2 4328.5 4419.6 4308.4 4349.3 4390.3 4431.2 4472.5 1.71 4055.2 .5 .52 4146.5 .4 .28 4237.7 .4 .51 4329.0 .4 .51 4420.1 .5 4055.12 N 31.85 E 4146.40 N 32.16 E 4237.61 N 32.61 E 4328.85 N 33.40 E 4419.92 N 34.98 E A Gyro da t a D i r e c t i on a i Survey B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, Location: F PAD, MILNE POINT FIELD, Job Number: AK0895G285 DRILLPIPE ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7105.0 7205.0 7305.0 7405.0 7505.0 65.80 359.12 4559.7 65.78 358.14 4600.7 65.75 356.83 4641.8 64.07 358.69 4684.2 63.96 358.28 4728.0 4510 4601 4692 4783 4872 .6 .7 .7 .1 .9 4513.7 4554.7 4595.8 4638.2 4682.0 1.94 4511.1 .4 .90 4602.3 .4 1.19 4693.4 .4 2.38 4783.8 .3 .38 4873.7 .3 4511.00 N 35.24 E 4602.18 N 33.05 4693.28 N 29.05 . 4783.76 N 25.50 E 4873.63 N 23.12 E 7535.0 7565.0 7595.0 7625.0 7655.0 64.00 359.00 4741.2 63.87 359.51 4754.3 63.89 359.10 4767.5 63.87 359.53 4780.7 63.94 358.45 4793.9 4899 4926 4953 4980 5007 .8 .7 .6 .6 .5 4695.2 4708.3 4721.5 4734.7 4747.9 2.18 4900.6 .3 1.58 4927.6 .3 1.25 4954.5 .3 1.29 4981.4 .2 3.23 5008.4 .2 4900.58 N 22.48 E 4927.52 N 22.13 E 4954.46 N 21.81 E 4981.39 N 21.48 E 5008.33 N 21.01 E 7685.0 7715.0 7745.0 7775.0 7805.0 63.93 357.68 4807.1 63.99 358.75 4820.3 64.22 358.90 4833.4 64.58 359.10 4846.4 64.38 358.83 4859.3 5034 5061 5088 5115 5142 .4 .3 .3 .3 .3 4761.1 4774.3 4787.4 4800.4 4813.3 2.31 5035.3 .2 3.21 5062.2 .2 .88 5089.2 .2 1.35 5116.3 .2 1.06 5143.3 .2 5035.26 N 20.10 E 5062.20 N 19.26 E 5089.19 N 18.71 E 5116.24 N 18.24 E 5143.30 N 17.75 E 7905.0 8005.0 8105.0 8205.0 8305.0 63 .41 358.85 4903.3 63 .02 359.33 4948.4 63 .64 359.77 4993 .2 64.95 .46 5036.6 65.06 359.03 5078.9 5232 5321 5410 5500 5591 .1 .3 .6 .7 .3 4857.3 4902.4 4947.2 4990.6 5032.9 .97 5233.1 .2 .58 5322.4 .2 .73 5411.7 .1 1.45 5501.8 .1 1.30 5592.4 .1 5233.08 N 15.93 5322.34 N 14.51 B ' 5411.70 N 13.82 E 5501.80 N 14.00 E 5592.43 N 13.60 E 8405.0 8435.0 8465.0 8495.0 8525.0 65.82 358.99 5120.4 65.79 358.14 5132.7 65.54 358.65 5145.1 65.61 358.16 5157.5 65.61 1.71 5169.9 5682.1 5709.5 5736.8 5764.1 5791.4 5074.4 5086.7 5099.1 5111.5 5123.9 .77 5683.4 .1 2.58 5710.7 .1 1.76 5738.1 .1 1.50 5765.4 .1 10.77 5792.7 .1 5683.37 N 12.02 E 5710.73 N 11.34 E 5738.05 N 10.57 E 5765.35 N 9.81 E 5792.67 N 9.78 E A Gyro da t a D i r e c t i on a i Survey B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, Location: F PAD, MILNE POINT FIELD, Job Number: AK0895G285 DRILLPIPE ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 8555.0 65.43 359.91 5182.3 8585.0 65.49 .56 5194.8 8615.0 66.11 1.52 5207.1 8645.0 65.99 2.41 5219.2 8675.0 65.86 2.62 5231.5 5818.7 5136.3 5845.9 5148.8 5873.3 5161.1 5900.7 5173.2 5928.1 5185.5 5.49 5820.0 .1 1.99 5847.3 .1 3.56 5874.6 .1 2.73 5902.0 .1 .79 5929.4 .1 5819.97 N 10.17 5847.26 N 10.28 5874.62 N 10.77 5902.02 N 11.71 5929.38 N 12.91 8705.0 65.56 1.19 5243.8 8735.0 65.34 90 5256.3 8765.0 65.02 .69 5268.9 8795.0 64.79 1.10 5281.6 8825.0 64.81 .48 5294.4 5955.5 5197.8 5982.7 5210.3 6010.0 5222.9 6037.1 5235.6 6064.3 5248.4 4.47 5956.7 .1 1.14 5984.0 .1 1'.25 6011.2 .1 1.45 6038.4 .1 1.86 6065.5 .1 5956.71 N 13.83 E 5984.00 N 14.32 E 6011.22 N 14.70 E 6038.39 N 15.13 E 6065.53 N 15.50 E 8855.0 64.45 .81 5307.2 8885.0 64.34 .95 5320.2 8915.0 64.17 1.18 5333.2 8945.0 63.93 .64 5346.4 8975.0 63.81 1.01 5359.6 6091.4 5261.2 6118.4 5274.2 6145.5 5287.2 6172.4 5300.4 6199.4 5313.6 1.56 6092.7 .1 .56 6119.7 .2 .90 6146.7 .2 1.81 6173.7 .2 1.17 6200.6 .2 6092.63 N 15.81 E 6119.68 N 16.22 E 6146.70 N 16.72 E 6173.67 N 17.15 E 6200.60 N 17.54 E 9005.0 63.65 .96 5372.9 9105.0 64.59 1.02 5416.5 9205.0 64.89 2.49 5459.2 6226.3 5326.9 6316.2 5370.5 6406.7 5413.2 .56 6227.5 .2 .94 6317.5 .2 1 . 36 6407 . 9 . 2 6227.50 N 18.00 I 6317.46 N 19.56 E 6407.85 N 22.33 E Final Station Closure: Distance: 6407.89 ft Az: .20 deg. A Gyro da t a D i r e c t i ona i Survey for B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, DRILLPIPE Location: F PAD, MILNE POINT FIELD, ALASKA Job Number: AK0895G285SS Run Date: 10-Aug-95 21:45:03 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 46 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 1.320 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPP 53, DRILLPIPE Location: F PAD, MILNE POINT FIELD, ALASKA Job Number: AK0895G285SS SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. -46.0 0.00 0.00 0.0 0.0 0.00 MEASURED DEPTHS REFERENCED TO NABORS 27 E R.K.B. 0.0 - 9205.0 FEET; GYRODATA GYRO SURVEY RUN IN DRILLPIPE. i ona 1 Survey Page CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 0.0 0.0 0.00 N 0.00 E 100.0 .38 72.18 146.0 .1 .39 200.0 .31 45.32 246.0 .4 .23 300.0 .38 42.62 346.0 .8 .07 400.0 .41 66.31 446.0 1.2 .17 500.0 .40 73.83 546.0 1.4 .38 600.0 .81 31.49 646.0 2.1 .70 700.0 2.33 14.47 746.0 4.7 1.57 800.0 4.16 3.39 846.0 10.3 1.89 900.0 5.64 .86 946.0 18.9 1.50 1000.0 7.06 1.41 1046.0 30.0 1.42 1100.0 8.41 2.61 1146.0 43.6 1.35 1200.0 9.77 2.75 1246.0 59.6 1.34 1300.0 10.94 1.92 1346.0 77.9 1.16 1400.0 12.98 1.14 1446.0 99.1 2.02 1500.0 15.51 359.20 1546.0 124.5 2.52 1600.0 17.18 357.72 1646.0 153.8 1.67 1700.0 18.55 .29 1746.0 185.9 1.62 1800.0 19.94 3.11 1846.0 220.8 1.58 1900.0 21.26 2.50 1946.0 258.3 1.37 2000.0 21.89 358.82 2046.0 297.8 1.50 1.0 85.4 1.5 75.1 2.1 64.6 2.7 61.4 3.3 63.7 4.6 59.5 8.4 43.6 15.4 26.0 25.2 15.2 37.5 9.9 52.3 7.4 69.3 6.1 88.3 5.2 110.8 4.4 137.4 3.5 166.8 2.6 198.3 1.9 232.0 1.9 267.8 2.0 304.8 1.9 .07 N .66 E .34 N 1.16 E .77 N 1.57 E 1.13 N 2.08 E 1.32 N 2.68 E 2.01.N 3.28 E 4.62 N 3.97 E 10.23 N 4.54 E 18.80 N 4.81 E 29.93 N 5.04 E 43.51 N 5.54 E 59.51 N 6.29 E 77.77 N 7.03 E 98.93 N 7.57 E 124.33 N 7.59 E 153.64 N 6.74 E 185.84 N 6.20 E 220.69 N 7.30 E 258.19 N 9.17 E 297.70 N 9.67 E A Gyro da t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, Location: F PAD, MILNE POINT FIELD, Job Number: AK0895G285SS DRILLPIPE ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 2100.0 24.45 355.02 2146.0 2200.0 28.32 354.34 2246.0 2300.0 32.78 354.44 2346.0 2400.0 36.69 353.46 2446.0 2500.0 39.61 355.78 2546.0 340.3 389.3 448.4 517.7 595.4 2.92 3.54 3.83 3.16 3.45 344.3 1.2 438.7 .4 494.4 359.6 554.1 358.9 617.1 358.2 340.20 N 7.36 E 389.31 N 2.81 W 448.56 N 3.05 W 518.07 N 10.42 W 595.98 N 18.31 W 2600.0 43.54 356.86 2646.0 2700.0 46.86 358.15 2746.0 2800.0 50.59 358.10 2846.0 2900.0 55.05 2.78 2946.0 3000.0 60.74 4.37 3046.0 682.9 784.3 897.1 1029.2 1188.4 3.06 2.94 2.82 3.49 3.40 750.8 358.0 827.5 358.0 903.5 358.0 1063.6 358.4 1234.8 359.0 683.67 N 23.48 W 785.10 N 26.89 W 898.07 N 31.48 W 1030.18 N 29.10 W 1189.15 N 19.63 W 3100.0 65.41 5.08 3146.0 3200.0 66.42 2.48 3246.0 3300.0 66.03 .05 3346.0 3400.0 66.37 .81 3446.0 3500.0 66.54 1.14 3546.0 1388.5 1613.7 1841.2 2067.9 2299.0 1.28 .66 .65 .58 1.01 1414.4 359.9 1688.6 .4 1871.6 .5 2146.2 .5 2329.9 .6 1388.90 N 2.31 E 1613.84 N 12.30 E 1841.27 N 16.46 E 2068.02 N 19.57 E 2299.03 N 24.63 E 3600.0 65.81 .20 3646.0 3700.0 65.21 .61 3746.0 3800.0 64.91 .58 3846.0 3900.0 65.55 359.49 3946.0 4000.0 64.72 .34 4046.0 2524.5 2743.4 2955.4 3175.9 3390.9 1.25 .51 .87 .98 .88 2603.7 .6 2785.4 .7 2966.1 .6 3239.3 .6 3420.4 .5 2524.53 N 28.37 2743.41 N 31.37 2955.47 N 32.81 3176.00 N 32.62 3391.07 N 30.37 E E ~ E E E 4100.0 66.04 .30 4146.0 4200.0 64.85 359.90 4246.0 4300.0 65.80 .17 4346.0 4400.0 65.89 .36 4446.0 4500.0 65.69 359.81 4546.0 3603.9 3823.2 4036.5 4259.0 4480.3 1.66 .76 1.43 .33 1.46 3692.7 .5 3874.1 .5 4055.2 .5 4329.0 .4 4511.1 .4 3604.14 N 31.72 E 3823.51 N 30.63 E 4036.81 N 31.74 E 4259.33 N 32.80 E 4480.71 N 35.15 E A Gyro da t a D i r e c t i o n a i Survey B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPP 53, Location: F PAD, MILNE POINT FIELD, Job Number: AK0895G285SS DRILLPIPE ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERT I CAL DOGLEG SECTION SEVERITY feet deg. / 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 4600.0 65.59 357.02 4646.0 4700.0 63.95 359.19 4746.0 4800.0 64.57 359.10 4846.0 4900.0 63.04 359.31 4946.0 5000.0 64.98 .14 5046.0 4701.7 1.31 4783.8 .3 4909.7 1.96 4927.6 .3 5114.5 1.34 5116.3 .2 5316.6 .60 5322.4 .2 5520.8 1.42 5592.4 .1 4702.28 N 28.70 E 4910.49 N 22.35 E 5115.48 N 18.25 E 5317.67 N 14.59 E 5521.94 N 13.91 E 5100.0 65.54 358.61 5146.0 5200.0 65.52 1.14 5246.0 5300.0 63.94 .66 5346.0 5400.0 64.80 2.03 5446.0 5413.2 64.89 2.49 5459.2 5738.8 1.74 5960.2 3.89 6171.7 1.78 6378.8 1.23 6406.7 1.36 5765.4 .1 5984.0 .1 6173.7 .2 6407.9 .2 6407.9 .2 5740.06 N 10.51 E 5961.47 N 13.91 E 6172.92 N 17.14 E 6379.95 N 21.47 E 6407.85 N 22.33 E Final Station Closure: Distance: 6407.89 ft Az: .20 deg. gyro/data 4. QUALITY CONTROL SR285.DOC Quality Control Comparisons B.P. EXPLORATION WELL: MILNE POINT WELL NUMBER MPF 53, Location: F PAD, MILNE POINT FIELD, DRILLPIPE ALASKA Job Number : AK0895G285 / AK0895G285 inrun/outrun Comparison inrun outrun Depth Inc Inc Delta 1505.0 14.40. 14.48 -.079 2005.0 21.44 21.57 - .133 2505.0 35.79 35.94 -. 147 2900.0 45.77 45.78 -. 002 3305.0 56.55 56.27 .285 3605.0 65.68 64.88 .808 7005.0 65.47 65.46 .003 8675.0 65.82 65.86 -.041 9205.0 64.63 64.89 -.266 inrun Az 1.85 2.83 354.62 359.22 3.10 3.94 1.78 1.68 3.39 For Inclinations Greater than 10 Average Inclination Difference = Average Azimuth Difference = degrees: .04748 deg. .18090 deg. outrun Az .88 2.07 354.11 359.32 3.19 4.90 1.21 2.62 2.49 Delta .973 .767 .516 -.102 -.089 -.960 .566 -.946 .903 gyro/data QUALITY CONTROL REPORT JOB NUMBER · AK0895G285 TOOL NUMBER 080 MAXIMUM GYRO TEMPERATURE 74.62°C MAXIMUM AMBIENT TEMPERATURE 44.50°C MAXIMUM INCLINATION 66.89° AVERAGE AZIMUTH 1.0610° WIRELINE REZERO VALUE + 5 FEET REZERO ERROR / K .00054 CALIBRATION USED FOR FIELD SURVEY · 23-JUNE-1995 CALIBRATION USED FOR FINAL SURVEY · 23-JUNE-1995 PRE JOB MASS BALANCE OFFSET CHECK: .05 MASS BALANCE OFFSET USED - 2.75 POST JOB MASS BALANCE OFFSET CHECK: -3.00 CONDITION OF SHOCK WATCHES UPON ARRIVAL AT RIG OK UPON COMPLETION OF SURVEY OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD FIELD SURVEY 9205 64.89 2.49 5459.30 FINAL SURVEY 9205 64.89 2.49 5459.20 NORTHING 6407.70 N 6407.84 N EASTING 22.60 E 22.53 E SR285.DOC gyro/data FUNCTION TEST JOB NUMBER: AK0895G285 5 Survey stations were collected at the depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 2900 45.78 45.78 45.78 45.78 45.77 AZIMUTH M.D. ft I 2 3 4 5 2900 358.97 359.25 359.01 359.10 359.02 SR285.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR285.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK0895G285 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL NO. 080 GYRO SECTION A0094 DATA SECTION A0025 POWER SECTION A0027 COMPUTER A0153 POWER SUPPLY A0085 PRINTER A0029 INTERFACE A0035 BACKUP TOOL NO. 713 GYRO SECTION A0073 DATA SECTION A0032 POWER SECTION A0052 COMPUTER A0122 POWER SUPPLY A0055 PRINTER A0079 INTERFACE A0071 WIRELINE COMPANY CABLE SIZE ATLAS WIRELINE 5/16" RUNNING GEAR 2 1/4" DRILLPIPE SYSTEM. TOTAL LENGTH OF TOOL MAXIMUM O.D. TOTAL WEIGHT OF TOOL 17 FEET 2 1/4 INCHES 150 POUNDS SR285.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER · AK0895G285 10 Aueust 1995 17:00 Leave E Pad. 17:30 Arrive Location. 18'15 Spot unit, Assemble tool, Standby. 19:50 Pick up tool, Assemble pump down sub. 20:30 Run in hole. 21:05 Pump tool down. 21:45 Depth 9200 feet, survey outrun. 23:00 Depth 6600 feet. 11 August 1995 00:15 01:00 02:30 Lay down tool. Rig down Western Atlas, Return to camp. Post run check. 05:00 Fax survey to rig. 15:00 Return to rig with disk. SR285.DOC gyro/data M CI OF LMIED ~. I I ~lol ...... B.P. EXPLORATION ~'~--~/' F-PAD, MPF-53 MILNE POINT, ALASKA Gyro Multishot Survey in 7 5/8" casing - SU~eyda~e. ~4~ePtemSer, 1995 ' Job number,' AK0995G297 RECEIVED MAY ?~ 0 1996 Alaska 011 & (~as Cons. Commission Anchorage SR297.DOC Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 October 6, 1995 Directional Information B.P. Exploration (Alaska) Inc. Petrotechnical Data Center, MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 Re: F-Pad, MPF-53, Milne Point, Alaska Enclosed please find one (1) original and six copies (6) of the completed survey of Well #MPF-53 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Operations Manager RS/gr Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER :AK0995G297 1. DISCUSSION, SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR297.DOC gyro/data 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR297.DOC gyro/data DISCUSSION JOB NUMBER' AK0995G297 Tool 080 was run in F-pad well number MPF-53 inside of 7 5/8" casing on Atlas 15/32 wireline. survey was run without problems. The SR297.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER: AK0995G297 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR297.DOC gyro/data 2. SURVEY DETAILS SR297.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0995G297 CLIENT: B.P. EXPLORATION RIG: Mast Truck LOCATION: Milne Point WELL: MPF-53 LATITUDE: 70.5050 LONGITUDE: W SURVEY DATE: 24-Sept, 1995 SURVEY TYPE : MULTISHOT IN 7 5/8" casing DEPTH REFERENCE: MAX. SURVEY DEPTH: ROTARY TABLE EVELATION 46.0 asl 12200.0 SURVEY TIED ONTO: N/A SURVEY INTERVAL: 100' UTM CO-ORDINATES: TARGET DIRECTION: 1.32 GRID CORRECTION: CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: STODDARD SR297.DOC gyro/data 3. OUTRUN SURVEY LISTING SR297.DOC A Gyro da t a D i r e c t i o n a i Survey for B.P. EXPLORATION WELL: P-PAD, MPF-53 Location: MAST TRUCK, MILNE POINT ALASKA Job Number: AK0995G297 Run Date: 24-Sep-95 11:32:24 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 46 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 1.320 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i on a i Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, Job Number: AK0995G297 MILNE POINT ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.0 0.0 -46.0 0.00 0.0 0.0 0.00 N 0.00 E 0 - 12200 FT. GYRO SURVEY RUN IN 9 5/8" CASING. MEASURED DEPTHS ARE REFERENCED TO AN R.K.B. HEIGHT OF 65 FT. ABOVE SEA LEVEL. 100.0 .41 113.88 100.0 -.1 54.0 .41 .4 113.9 200.0 .38 119.79 200.0 -.4 154.0 .05 1.0 115.8 300.0 .38 115.26 300.0 -.7 254.0 .03 1.7 116.4 400.0 .50 114.14 400.0 -1.0 354.0 .12 2.5 115.9 500.0 .43 110.91 500.0 -1.3 454.0 .08 3.3 115.1 600.0 .52 95.43 600.0 -1.5 554.0 .16 4.1 112.6 700.0 2.21 23~.75 700.0 .3 654.0 2.10 5.0 88.2 800.0 4.21 5.52 799.8 5.7 753.8 2.22 8.3 47.7 900.0 5.49 2.65 899.4 14.1 853.4 1.30 15.5 25.6 1000.0 7.02 2.85 998.8 25.0 952.8 1.53 25.9 16.2 1100.0 8.68 4.71 1097.9 38.7 1051.9 1.68 39.3 11.9 1200.0 9.62 3.49 1196.6 54.6 1150.6 .96 55.1 9.7 1300.0 10.65 3.34 1295.1 72.1 1249.1 1.03 72.7 8.2 1400.0 12.46 2.02 1393.0 92.2 1347.0 1.82 92.6 7.0 1500.0 15.21 .90 1490.1 116.1 1444.1 2.77 116.4 5.8 1600.0 17.09 358.37 1586.2 143.9 1540.2 2.01 144.1 4.6 1700.0 18.22 359.36 1681.5 174.2 1635.5 1.17 174.3 3.6 1800.0 19.47 2.51 1776.1 206.5 1730.1 1.61 206.6 3.2 1900.0 20.87 4.18 1870.0 240.9 1824.0 1.51 241.0 3.2 2000.0 20.78 .74 1963.4 276.4 1917.4 1.23 276.6 3.1 .14 S .33 E .45 S .94 E .76 S 1.53 E 1.08 S 2.22 E 1.39 S 2.97 E 1.56 S 3.77 E .15 N 5.00 E 5.57 N 6.12 E 14.00 N 6.70 E 24.87 N 7.22 E 38.50 N 8.15 = 54.35 N 9.27 . 71.92 N 10.32 E 91.93 N 11.24 E 115.83 N 11.83 E 143.63 N 11.61 E 173.96 N 11.02 E 206.24 N 11.57 E 240.66 N 13.60 E 276.16 N 15.13 E A Gyro d a t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, Job Number: AK0995G297 MILNE POINT ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet 2050.0 21.46 358.37 2010.1 2100.0 22.94 357.18 2056.4 2150.0 24.16 355.47 2102.2 2200.0 25.78 354.99 2147.5 2250.0 27.53 355.55 2192.2 VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH. SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. 294.4 1964.1 2.18 294.6 2.9 313.3 2010.4 3.09 313.4 2.6 333.2 2056.2 2.79 333.2 2.2 354.2 2101.5 3.26 354.2 1.8 376.5 2146.2 3.55 376.5 1.4 HORIZONTAL COORDINATES feet 294.17 N 14.99 313.05 N 14.25 332.98 N 12.96 354.01 N 11.20 376.36 N 9.35 E 2300.0 29.36 355.28 2236.2 2350.0 31.19 356.29 2279.4 2400.0 33.06 355.62 2321.7 2450.0 34.86 355.39 2363.2 2500.0 36.70 355.37 2403.7 400.2 2190.2 3.67 400.2 1.1 425.3 2233.4 3.79 425.3 .8 451.7 2275.7 3.81 451.8 .5 479.5 2317.2 3.60 479.6 .2 508.6 2357.7 3.70 508.7 359.9 400.10 N 7.45 E 425.24 N 5.60 E 451.76 N 3.72 E 479.60 N 1.53 E 508.74 N .82 W 2550.0 37.44 355.38 2443.6 2600.0 38.04 355.89 2483.2 2650.0 39.83 356.96 2522.1 2700.0 41.44 358.58 2560.0 2750.0 43.10 358.82 2597.0 538.6 2397.6 1.48 538.8 359.7 569.0 2437.2 1.35 569.3 359.4 600.3 2476.1 3.82 600.7 359.3 632.8 2514.0 3.84 633.3 359.2 666.4 2551.0 3.34 666.9 359.2 538.78 N 3.25 W 569.30 N 5.58 W 600.66 N 7.54 W 633.19 N 8.80 W 666.81 N 9.56 W 2800.0 43.99 358.54 2633.2 2850.0 45.27 359.53 2668.8 2900.0 45.95 358.81 2703.8 2950.0 47.50 358.75 2738.1 3050.0 49.91 358.63 2804.1 700.8 2587.2 1.83 701.3 359.2 735.9 2622.8 2.89 736.5 359.1 771.6 2657.8 1.71 772.2 359.1 808.0 2692.1 3.09 808.6 359.1 883.0 2758.1 2.41 883.7 359.1 701.25 N 10.35 T', 736.37 N 10.94 772.10 N 11.46 W 808.49 N 12.24 W 883.60 N 13.96 W 3100.0 50.81 357.44 2836.0 3150.0 52.26 1.49 2867.1 3200.0 54.12 2.70 2897.0 3250.0 55.71 4.08 2925.8 3300.0 56.83 4.54 2953.5 921.5 2790.0 2.56 922.2 359.1 960.6 2821.1 6.97 961.3 359.1 1000.6 2851.0 4.20 1001.3 359.2 1041.5 2879.8 3.89 1042.1 359.4 1083.0 2907.5 2.37 1083.5 359.5 922.07 N 15.28 W 961.21 N 15.63 W 1001.21 N 14.16 W 1042.05 N 11.74 W 1083.51 N 8.61 W A Gy r o da t a D i r e c t i o n a i Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, Job Number: AK0995G297 MILNE POINT ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 3350.0 58.22 3.90 2980.4 3400.0 59.87 4.63 3006.1 3450.0 61.47 3.40 3030.6 3500.0 62.96 4.83 3053.9 3600.0 64.81 5.31 3097.9 1125.2 2934.4 2.97 1125.6 359.7 1168.0 2960.1 3.54 1168.3 359.9 1211.5 2984.6 3.85 1211.8 .0 1255.7 30.07.9 3.91 1255.9 .2 1345.3 3051.9 1.89 1345.4 .5 1125.58 N 5.51 W 1168.33 N 2.32 W 1211.81 N .73 1255.93 N 3.91 m~ 1345.37 N 11.85 E 3700.0 65.78 3.75 3139.7 3800.0 66.26 3.40 3180.4 3900.0 65.97 1.36 3220.8 4000.0 65.90 1.12 3261.6 4100.0 65.98 1.33 3302.4 1436.0 3093.7 1.72 1436.1 .8 1527.3 3134.4 .58 1527.3 .9 1618.7 3174.8 1.89 1618.7 1.0 1710.0 3215.6 .23 1710.0 1.0 1801.3 3256.4 .21 1801.3 1.0 1435.93 N 19.01 E 1527.12 N 24.70 E 1618.48 N 28.50 E 1709.76 N 30.47 E 1801.05 N 32.42 E 4200.0 65.81 1.33 3343.2 4300.0 66.30 .79 3383.8 4400.0 66.14 1.55 3424.1 4500.0 66.35 1.42 3464.4 4600.0 66.49 1.64 3504.4 1892.6 3297.2 .18 1892.6 1.0 1984.0 3337.8 .70 1984.0 1.0 2075.5 3378.1 .72 2075.5 1.1 2167.0 3418.4 .24 2167.1 1.1 2258.7 3458.4 .24 2258.7 1.1 1892.31 N 34.54 E 1983.68 N 36.24 E 2075.18 N 38.10 E 2166.67 N 40.48 E 2258.29 N 42.92 E 4700.0 66.16 1.33 3544.6 4800.0 65.92 1.26 3585.2 4900.0 65.74 1.42 3626.1 5000.0 65.36 1.26 3667.5 5100.0 65.04 .42 3709.5 2350.3 3498.6 .43 2350.3 1.1 2441.6 3539.2 .25 2441.7 1.1 2532.9 3580.1 .24 2532.9 1.1 2623.9 3621.5 .40 2623.9 1.1 2714.7 3663.5 .83 2714.7 1.1 2349.84 N 45.29 2441.21 N 47.35 2532.41 N 49.49 2623.42 N 51.62 2714.18 N 52.95 5200.0 64.80 1.18 3751.9 5300.0 64.35 .93 3794.8 5400.0 65.16 359.66 3837.4 5500.0 65.66 1.04 3879.0 5600.0 65.15 .73 3920.7 2805.3 3705.9 .73 2805.3 1.1 2895.6 3748.8 .51 2895.6 1.1 2986.0 3791.4 1.41 2986.0 1.1 3076.9 3833.0 1.35 3076.9 1.1 3167.8 3874.7 .58 3167.9 1.1 2804.75 N 54.21 E 2895.05 N 55.87 E 2985.49 N 56.33 E 3076.42 N 56.89 E 3167.33 N 58.29 E A Gyro d a t a D i r e c t i on a i Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, Job Number: AK0995G297 MILNE POINT ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 57 58 59 6O 61 00.0 00.0 00.0 00.0 00.0 64.76 .30 3963.0 64.87 .65 4005.6 64.53 .90 4048.3 64.06 .43 4091.7 65.63 .16 4134.2 3258.4 3917.0 .55 3258.5 1.0 3348.9 3959.6 .34 3349.0 1.0 3439.3 4002.3 .41 3439.4 1.0 3529.4 4045.7 .63 3529.5 1.0 3619.9 4088.2 1.58 3620.0 1.0 3257.93 N 59.11 E 3348.42 N 59.86 E 3438.82 N 61.08 3528.92 N 62.13 E 3619.43 N 62.59 E 62 63 64 65 66 00.0 00.0 00.0 00.0 00.0 65.48 .07 4175.5 64.86 .33 4217.5 64.48 .64 4260.3 64.38 .75 4303.5 65.75 .31 4345.7 3710.9 4129.5 .17 3711.0 1.0 3801.7 4171.5 .66 3801.7 1.0 3892.0 4214.3 .48 3892.1 .9 3982.2 4257.5 .14 3982.3 .9 4072.9 4299.7 1.43 4073.0 .9 3710.46 N 62.78 E 3801.22 N 63.10 E 3891.60 N 63.86 E 3981.80 N 64.95 E 4072.47 N 65.79 E 67 68 69 70 71 00.0 00.0 00.0 00.0 00.0 65.17 1.15 4387.2 65.50 1.74 4428.9 65.84 1.41 4470.1 65.37 .21 4511.4 65.43 .55 4553.0 4163.9 4341.2 .96 4164.0 .9 4254.7 4382.9 .63 4254.8 .9 4345.9 4424.1 .44 4346.0 .9 4436.9 4465.4 1.19 4437.0 .9 4527.8 4507.0 .31 4527.9 .9 4163.43 N 66.94 E 4254.28 N 69.23 E 4345.36 N 71.73 E 4436.42 N 73.03 E 4527.34 N 73.63 E 72 73 74 75 76 00.0 65.53 .01 4594.5 00.0 65.13 358.08 4636.3 00.0 64.14 359.13 4679.1 00.0 63.98 359.16 4722.9 00.0 63.80 359.81 4766.9 4618.8 4548.5 .50 4618.9 .9 4709.6 4590.3 1.80 4709.7 .9 4799.9 4633.1 1.38 4800.0 .8 4889.7 4676.9 .17 4889.9 .8 4979.5 4720.9 .61 4979.7 .8 4618.32 N 74.07 4709.18 N 72.55 4799.51 N 70.35 E 4889.42 N 69.01 E 4979.21 N 68.20 E 77 78 79 8O 81 00.0 00.0 00.0 00.0 00.0 63.72 .30 4811.1 63.96 .44 4855.2 63.19 359.97 4899.7 62.96 .49 4945.0 63.83 .14 4989.8 5069.1 4765.1 .45 5069.4 .8 5158.9 4809.2 .28 5159.1 .8 5248.4 4853.7 .88 5248.7 .8 5337.5 4899.0 .52 5337.8 .7 5426.9 4943.8 .92 5427.2 .7 5068.90 N 68.28 E 5158.65 N 68.86 E 5248.20 N 69.19 E 5337.36 N 69.55 E 5426.77 N 70.04 E A Gyro da t a D i r e c t i o n a i Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, Job Number: AK0995G297 MILNE POINT ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 8200.0 64.65 .86 5033.2 8300.0 64.76 .26 5076.0 8400.0 65.57 .06 5118.0 8500.0 65.12 .47 5159.7 8600.0 65.46 1.21 5201.5 5517.0 4987.2 1.05 5517.3 .7 5607.4 5030.0 .55 5607.7 .7 5698.1 5072.0 .82 5698.4 .7 5789.0 5113.7 .59 5789.3 .7 5879.8 5155.5 .75 5880.2 .7 5516.82 N 70.82 E 5607.23 N 71.71 F. 5697.98 N 71.96 ,, ) 5788.86 N 72.39 ~ 5879.70 N 73.72 E 8700.0 65.52 1.45 5243.0 8800.0 64.73 .26 5285.0 8900.0 63.92 .04 5328.4 9000.0 63.51 .19 5372.6 9100.0 64.33 .70 5416.6 5970.8 5197.0 .23 5971.1 .7 6061.5 5239.0 1.34 6061.9 .7 6151.6 5282.4 .83 6152.0 .7 6241.3 5326.6 .43 6241.6 .7 6331.1 5370.6 .94 6331.5 .7 5970.66 N 75.83 E 6061.37 N 77.18 E 6151.49 N 77.42 E 6241.15 N 77.59 E 6330.97 N 78.29 E 9200.0 64.76 2.13 5459.6 9300.0 65.40 2.87 5501.7 9400.0 64.72 1.92 5543.9 9500.0 64.06 .77 5587.1 9600.0 64.96 1.18 5630.2 9700.0 65.94 2.27 5671.7 9800.0 65.52 2.18 5712.8 9900.0 64.85 1.57 5754.8 10000.0 64.56 1.40 5797.5 10100.0 64.17 .14 5840.8 6421.4 5413.6 1.36 6421.7 .7 6512.1 5455.7 .93 6512.4 .7 6602.7 5497.9 1.10 6603.0 .8 6692.9 5541.1 1.23 6693.2 .8 6783.1 5584.2 .98 6783.4 .8 6874.1 5625.7 1.40 6874.4 .8 6965.3 5666.8 .43 6965.5 .8 7056.0 5708.8 .87 7056.3 .8 7146.4 5751.5 .33 7146.7 .8 7236.6 5794.8 1.20 7236.8 .8 6421.23 N 80.52 E 6511.83 N 84.48 E 6602.42 N 88.27 E 6692.57 N 90.39 E 6782.82 N 91.93 E 6873.74 N 6964.84 N 7055.55 N 7145.93 N 7236.08 N 94.68 ~ 98.22 ~ 101.19 E 103.53 E 104.74 E 10200.0 63.75 .30 5884.7 10300.0 63.90 .21 5928.8 10400.0 63.98 1.01 5972.7 10500.0 62.14 .52 6018.0 10600.0 59.59 .32 6066.7 7326.4 5838.7 .44 7326.7 .8 7416.1 5882.8 .17 7416.4 .8 7506.0 5926.7 .73 7506.3 .8 7595.1 5972.0 1.89 7595.4 .8 7682.4 6020.7 2.56 7682.7 .8 7325.93 N 7415.67 N 7505.50 N 7594.63 N 7681.97 N 105.09 E 105.48 E 106.44 E 107.64 E 108.29 E .. A Gyro da t a D i r e c t i o n a i Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, Job Number: AK0995G297 MILNE POINT ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 1070 1080 1090 1100 1110 0.0 0.0 0.0 0.0 0.0 57.33 .31 6119.0 55.04 .78 6174.7 52.93 .69 6233.5 50.05 .35 6295.7 47.47 359.32 6361.6 7767.6 6073.0 2.26 7768.0 .8 7850.7 6128.7 2.32 7851.0 .8 7931.6 6187.5 2.12 7931.9 .8 8009.8 6249.7 2.89 8010.1 .8 8085.0 6315.6 2.70 8085.3 .8 7767.19 N 7850.26 N 7931.13 N 8009.37 N 8084.56 N 108.76 109.55 110.58 111.29 111.09 1120 1130 1140 1150 1160 0.0 0.0 0.0 0.0 0.0 45.06 357.98 6430.8 42.52 358.08 6502.9 39.99 358.14 6578.1 37.37 358.35 6656.2 36.60 357.22 6736.0 8157.1 6384.8 2.60 8157.5 .8 8226.2 6456.9 2.54 8226.6 .7 8292.1 6532.1 2.53 8292.5 .7 8354.5 6610.2 2.62 8354.9 .7 8414.5 6690.0 1.03 8415.0 .7 8156.78 N 8225.94 N 8291.84 N 8354.31 N 8414.43 N 109.41 E 107.03 E 104.86 E 102.94 E 100.62 E 1170 1180 1190 1200 1210 0.0 0.0 0.0 0.0 0.0 35.55 356.16 6816.9 34.51 355.32 6898.8 33.86 354.63 6981.5 32.96 353.06 7065.0 31.45 352.08 7149.6 8473.2 6770.9 1.23 8473.8 .7 8530.3 6852.8 1.14 8531.0 .6 8586.2 6935.5 .76 8586.9 .6 .8640.8 7019.0 1.25 8641.5 .5 8693.4 7103.6 1.60 8694.3 .5 8473.21 N 8530.44 N 8586.41 N 8641.16 N 8694.00 N 97.22 E 92.96 E 88.04 E 82.15 E 75.27 E 1220 0.0 30.72 352.31 7235.2 8744.4 7189.2 .73 8745.4 .4 8745.15 N 68.25 Final Station Closure: Distance: 8745.42 ft Az: .45 deg. A Gy r o d a t a D i r e c t i o n a i Survey for B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, MILNE POINT ALASKA Job Number: AK0995G297SS Run Date: 24-Sep-95 11:32:24 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 46 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 1.320 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro d a t a D i r e c t i o n a I Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, MILNE POINT ALASKA Job Number: AK0995G297SS Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet -46.0 0.00 0.00 0.0 0.0 0.00 0.0 0.0 0.00 N 0.00 E 0 - 12200 FT. GYRO SURVEY RUN IN 9 5/8" CASING. MEASURED DEPTHS ARE'REFERENCED TO AN R.K.B. HEIGHT OF 65 FT. ABOVE SEA LEVEL. 100.0 .40 116.60 146.0 -.3 .24 1.0 114.7 200.0 .38 117.71 246.0 -.6 .04 1.7 116.1 300.0 .43 114.75 346.0 -.9 .07 2.5 116.2 400.0 .47 112.66 446.0 -1.2 .10 3.3 115.5 500.0 .47 103.79 546.0 -1.4 .12 4.1 113.9 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 00.0 1.30 62.44 646.0 -.7 1.05 5.0 101.4 00.0 3.13 15.35 746.0 2.8 2.16 8.3 69.6 00.0 4.80 4.19 846.0 9.6 1.80 15.5 37.5 00.0 6.20 2.75 946.0 19.2 1.41 25.9 21.2 00.0 7.81 3.73 1046.0 31.5 1.60 39.3 14.2 00 . 0 9 . 14 4 . 11 1146 . 0 46 . 4 1 . 33 55 . 1 10 . 8 00 . 0 10 . 14 3 . 41 1246 . 0 63 . 4 1 . 00 72 . 7 8 . 9 00 . 0 11 . 59 2 . 66 1346 . 0 82 . 6 1 . 44 92 . 6 7 . 5 00 . 0 13 . 96 1 . 41 1446 . 0 105 . 2 2 . 34 116 . 4 6 . 3 00.0 16.30 359.43 1546.0 132.2 2.33 144.1 5.1 00.0 17.80 358.99 1646.0 162.9 1.48 174.3 4.0 00.0 19.07 1.51 1746.0 196.2 1.47 206.6 3.3 00.0 20.51 3.75 1846.0 232.1 1.54 241.0 3.2 00.0 20.80 1.38 1946.0 269.8 1.28 276.6 3.2 00.0 22.61 357.44 2046.0 309.1 2.89 313.4 2.7 .29 S .61 E .59 S 1.21 E .91 S 1.85 E 1.22 S 2.56 E 1.47 S 3.33 E .92 N 4.33 E 2.65 N 5.52 E 9.48 N 6.39 E 19.09 N 6.95 E 31.36 N 7.66 E 46.22 N 8.70 E 63.17 N 9.80 E 82.32 N 10.80 E 104.97 N 11.56 E 132.00 N 11.70 E 162.67 N 11.24 E 195.97 N 11.40 E 231.87 N 13.08 E 269.53 N 14.85 E 308.81 N 14.41 E A Gyro d a t a D i r e c t i o n a i Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, MILNE POINT ALASKA Job Number: AK0995G297SS Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet dego deg. feet feet DOGLEG SEVERITY dew. / 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 2100.0 25.72 355.00 2146.0 2200.0 29.78 355.51 2246.0 2300.0 34.11 355.49 2346.0 2400.0 37.48 355.41 2446.0 2500.0 40.85 357.98 2546.0 353.5 405.9 468.0 540.4 620.8 . 3. 3. 1. 3. 25 70 69 47 83 354.2 1.8 '425.3 1.0 479.6 .3 569.3 359.6 633.3 359.2 353.29 N 11.26 E 405.81 N 7.03 E 468.07 N 2.44 E 540.61 N 3.39 W 621.19 N 8.33 W 2600.0 44.45 358.90 2646.0 2700.0 47.79 358.73 2746.0 2800.0 51.28 358.75 2846.0 2900.0 56.53 4.41 2946.0 3000.0 62.46 4.35 3046.0 713 817 934 1071 1240 .4 .0 .1 .8 .7 o 3. 3. 2. 3. 21 01 98 78 89 736.5 359.2 883.7 359.1 961.3 359.1 1083.5 359.5 1255.9 .1 713.84 N 10.56 W 817.51 N 12.44 W 934.69 N 15.39 W 1072.26 N 9.46 W 1240.97 N 2.83 E 3100.0 65.85 3.69 3146.0 3200.0 65.93 1.21 3246.0 3300.0 65.84 1.30 3346.0 3400.0 66.25 1.48 3446.0 3500.0 66.16 1.32 3546.0 1450 1675 1898 2125 2353 .1 .0 .8 .2 .5 54 86 21 46 42 1527.3 .8 1710.0 1.0 1984.0 1.0 2167.1 1.1 2441.7 1.1 1450.04 N 19.89 E 1674.80 N 29.72 E 1898.55 N 34.66 E 2124.84 N 39.39 E 2353.06 N 45.36 E 3600.0 65.56 1.35 3646.0 3700.0 64.84 1.07 3746.0 3800.0 65.27 359.94 3846.0 3900.0 64.91 .47 3946.0 4000.0 64.55 .88 4046.0 2576 2792 3004 3222 3434 .6 .7 .7 .0 .5 32 74 39 57 40 2623.9 1.1 2805.3 1.1 3076.9 1.1 3258.5 1.0 3439.4 1.0 2576.11 N 50.51 E 2792.24 N 54.04 E 3004.20 N 56.45 E 3221.54 N 58.78 E 3433.98 N 61.02 E 4100.0 65.58 .13 4146.0 4200.0 64.61 .54 4246.0 4300.0 65.74 .31 4346.0 4400.0 65.64 1.60 4446.0 4500.0 65.42 .49 4546.0 3645.9 3861.8 4073 . 7 4292.5 4512.5 1.18 .54 1.42 .55 .46 3711.0 1.0 3892.1 .9 4164.0 .9 4346.0 .9 4527.9 .9 3645.47 N 62.64 E 3861.34 N 63.61 E 4073.23 N 65.80 E 4292.05 N 70.26 E 4511.96 N 73.53 E A Gyro da t a D i r e c t i ona I Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, MILNE POINT ALASKA Job Number: AK0995G297SS Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg./ lO0 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 4600 . 0 64 . 91 358 . 32 4646 . 0 4700 . 0 63 . 88 359 . 50 4746 . 0 4800 . 0 63 . 91 . 41 4846 . 0 4900.0 62.98 .48 4946.0 5000.0 64.68 .68 5046.0 4730.1 4936.9 5140.2 5339.6 5544.0 7O 4O 31 52 9O 4800.0 .9 4979.7 .8 5159.1 .8 5427.2 .7 5607.7 .7 4729.66 N 72.05 E 4936.60 N 68.58 E 5139.94 N 68.74 E 5339.39 N 69.56 E 5543.83 N 71.09 E 5100.0 65.27 .34 5146.0 5200.0 65.46 1.36 5246.0 5300.0 63.76 .10 5346.0 5400.0 64.62 1.68 5446.0 5500.0 64.69 1.86 5546.0 5759.2 5977.3 6187.3 6392.8 6607.1 .66 .31 .67 1.23 1.11 5789.3 .7 6061.9 .7 6241.6 .7 6421.7 .7 6693.2 .8 5759.07 N 72.25 E 5977.19 N 75.92 E 6187.20 N 77.49 E 6392.70 N 79.82 E 6606.82 N 88.38 E 5600.0 65.34 1.60 5646.0 5700.0 64.99 1.70 5746.0 5800.0 64.12 .16 5846.0 5900.0 63.93 .53 5946.0 6000.0 60.67 .41 6046.0 6817.8 7037.0 7247.3 7451.3 7645.3 o 14 78 11 39 28 6874.4 .8 7056.3 .8 7326.7 .8 7506.3 .8 7682.7 .8 6817.50 N 7036.59 N 7246.79 N 7450.87 N 7644.84 N 92.98 E 100.57 E 104.79 E 105.86 E 108.01 E 6100.0 56.22 .54 6146.0 7807.9 6200.0 52.35 .62 6246.0 7947.3 6300.0 48.08 359.57 6346.0 8067.1 6400.0 44.53 358.00 6446.0 8171.7 6500.0 41.07 358.12 6546.0 8263.9 2.29 2.27 2.74 2.58 2.53 7851.0 .8 8010.1 .8 8085.3 .8 8226.6 .8 8292.5 .7 7807.48 N 7946.89 N 8066.72 N 8171.38 N 8263.69 N 109.14 E 110.73 E 111.14 E 108.91 E 105.79 E 6600.0 37.71 358.32 6646.0 6700.0 36.47 357.09 ~6746.0 6800.0 35.18 355.86 6846.0 6900.0 34.14 354.92 6946.0 7000.0 33.17 353.41 7046.0 8346.3 8421.7 8493.5 8562.2 8628.4 2.61 1.05 1.20 .92 1.14 8354.9 .7 8473.8 .7 8531.0 .6 8586.9 .6 8641.5 .6 8346.17 N 8421.66 N 8493.57 N 8562.41 N 8628.72 N 103.19 100.20 95.71 90.16 83.49 A Gy r o da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, MILNE POINT ALASKA Job Number: AK0995G297SS Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7100.0 31.51 352.13 7146.0 7189.2 30.72 352.31 7235.2 8691.2 8744.4 1.58 8694.3 .5 .73 8745.4 .4 8691.77 N 75.56 E 8745.15 N 68.25 E Final Station Closure: Distance: 8745.42 ft Az: .45 deg. gyro/data 4. QUALITY CONTROL SR297.DOC Quality Control Comparisons B.P. EXPLORATION WELL: F-PAD, MPF-53 Location: MAST TRUCK, MILNE POINT ALASKA Job Number : AK0995G297 INRUN/OUTRUN Comparison / AK0995G297 INRUN OUTRUN INRUN Depth Inc Inc Delta Az 1000.0 6.57 7.02 -.450 2.83 2000.0 20.98 20.78 .191 1.60 2900.0 45.70 45.95 -.250 359.43 4000.0 65.86 65.90 -.033 1.36 4600.0 66.50 66.49 .015 1.74 12200.0 30.72 30.72 -.000 352.35 For Inclinations Greater than 10 degrees: Average Inclination Difference = -.0153 deg. Average Azimuth Difference = .37310 deg. OUTRUN Az 2.85 .74 358.81 1.12 1.64 352.31 Delta -.017 .856 .624 .242 .104 .039 g_ yro/data QUALITY CONTROL REPORT JOB NUMBER: AK0995G297 TOOL NUMBER' 080 MAXIMUM GYRO TEMPERATURE: 81.7c MAXIMUM AMBIENT TEMPERATURE: 99 c MAXIMUM INCLINATION: 66.49 AVERAGE AZIMUTH: .45 WIRELINE REZERO VALUE: no correction REZERO ERROR / K: n/a CALIBRATION USED FOR FIELD SURVEY: 8/21/95 CALIBRATION USED FOR FINAL SURVEY: 8/21/95 PRE JOB MASS BALANCE OFFSET CHECK: .22 POST JOB MASS BALANCE OFFSET CHECK~: CONDITION OF SHOCK WATCHES .27 USED .24 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS: M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY FINAL SURVEY 12200 30.72 352.38 7235.4 8745.1N 67.9E 12200 30.72 352.31 7235.2 8745.15N 68.25E SR297.DOC gyro/data FUNCTION TEST JOB NUMBER: AK0995G297 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 11300 42.52 42.53 42.52 42.52 42.52 AZIMUTH M.D. ff 1 2 3 4 5 11300 358.08 358.09 358.1 358.01 357.98 SR297.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR297.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: 'AK0995G297 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 080 GYRO SECTION A0098 DATA SECTION A0032 POWER SECTION A0027 COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0074 A0079 A0071 BACKUP TOOL No. 731 GYRO SECTION A0054 DATA SECTION A0025 POWER SECTION A0052 COMPUTER POWER SUPPLY PRINTER INTERFACE A0122 A0074 A0082 A0035 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 15/32 RUNNING GEAR 3.0" System TOTAL LENGTH OF TOOL: 17.5 feet MAXIMUM O.D.: 3.12 INCHES TOTAL WEIGHT OF TOOL: 210 Lbs SR297.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK0995G297 9/22/95 1145 9/23/95 0930 1230 0530 0830 ARRIVE ON THE SLOPE LEAVE FOR MILNE POINT. PU TOOL. ZERO TO r.k.b... START INRUN. pull out of the hole. rtn to Atlas SR297.DOC LARRY GRANT - Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 November 1995 Transmittal of Data Sent by: US MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION ECC No. Run $ .1 6453.01 Run ~ 1 1 PFC/PERF FINAL BL&RF .Run ~ 1 ! PLS STATIC FIN BL&RF 1 PFC/PERF FINAL BL&RF 6478.02 Run # 1 6480.02 Run # 1 ! PFC/PERF FINAL BL&RF Run # 1 6485.01 ~Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518  ~ Or FAX to (907) 563-7803 Received ~/~ ~/~J Date: ORII_I_IEI r'4 C;ERl./Ir"Ec~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 November 17, 1995 RE: MWD Formation Evaluation Logs - MP F-53, AK-MM-950837 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 MPF-53: 2" x 5" MD Resistivity and Gamma Ray Logs: 2" x 5" TVD Resistivity and Gamma Ray Logs: 1 .Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia 2" x 5" MD Neutron and Density Logs: 2" x 5" TVD Neutron and Density Logs: MPF-53 PB1: 1 Blueline 1 Rev. Folded Sepia 1Blueline ~-4L,4.~ ~Og., ,. '' · ,);~ ', 1 Rev. Folded semitic, c:, , "' -. ):.'. .~ .,~,?&,;; ,,,: .. ~C'... "" ~.... ~: ,'.,.'? .~. ,,... 2" x 5" MD Resistivity and Gamma Ray Logs' 1 Blueline 1 Rev. Folded Sepia 2" x 5" TVD Resistivity and Gamma Ray Logs: 1 Blueline 1 Rev. Fold¢Sel 5631 Silverado Way, Suite G · Anchorage, Alaska 995!fi · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 29 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: MPF-53 DESCRIPTION 1 PFC/PERF FINAL BL+RF 1 GR/CCL FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run # 1 6478.01 Run # 1 6485.00 Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518  Or FAX to (907) 563-7803 Received /,~ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 22 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 LDWG TAPE+LIS 1 LDWG TAPE+LIS E'CC No. Run # 1 6478.00 Run # 1 6480.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 F7 Or FAX to (907) 563-7803 Received by: /~/~ ~-~~ Date: RECEIVED S EP 2 8 19 5 Alaska Oil & Gas Cons. Commission Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 19 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run # 1 6334.02 Run # 1 6478.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518  Or FAX to (907) 563-7803 Received by~~.~/~"~~'~-~----~ Date: Please sl..~., and ~eturn Petrotechnical Data Cente~ BP Exr'lora-tion (Alaska) Ino 900 ~:~st Benson Boulevard Anchorage, ,~laska 99500 .Received b.y ' " ' MEMORANDU i State o, Alaska Alaska Oil and Gas Conservation Commission TO: David Joh,~l~,// Chairman ~ DATE: August 8, 1995 THRU' FROM: Blair Wondzeli, P. i. Supervisor Bobby Foster, Petroleum Inspector¢ FILE NO' SUBJECT: AWQIHHCD:doc BOPE Test- Nabors 27E BPX - MPU - Well F-53 PTD # 95-0108 Milne Point Field Tuesday, August 8, 1995: I traveled this date to BPX's MPU well F-53 being drilled by Nabom rig 27E and witnessed the initial BOPE test. As the attached AOGCC BOPE Test Report shows/there were no failures of the BOPE equipment. The rig was very clean and all of the equipment seemed to be in good working order. The location was clean and there was good access to all areas of the rig. Summary:. ! witnessed the satisfactory BOPE test on Nabors rig 27E drilling BPX's MPU well F-53. Attachment: AWQIHHCD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Drlg Contractor: Operator: Well Name: Casing Size: 9.625" Test: Initial X Workover: NABORS Rig No. 27E PTD # 95-0108 BPX Rep.: MP F-53 Rig Rep.: Set @ 6750' Location: Sec. Weekly Other DATE: 8/8/95 Rig Ph.# 695-43473 JIM GAFFENEY ROD KLEPZIG 6 T. 13N R. 'IOE Meridian UM. TEST DATA MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gert) PTD On Location YES Standing Order Posted YES Well Sign OK Drl. Rig OK Hazard Sec. YES BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F I 300/3,000 P I 500/5,000 P 1 500/5,000 P 1 500/5,000 P I 500/5,000 P 2 500/5, 000 P I 500/5,000 P N/A MUD SYSTEM: Visual Trip Tank YES Pit Level Indicators YES Flow Indicator YES Meth Gas Detector YES H2S Gas Detector YES Alarm YES YES YES YES YES FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Quan. Pressure P/F 1 500/5, 000 P 5OO/5, OOO P 500/5,000 P 500/5, 000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 16 Test Pressure P/F 500/5, 000 P 42 500/5, 000 P 1 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure 0 System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 8 @ 2250 3, 000 J P 1,300 I P minutes 26 sec. minutes 48 sec. YES Remote: YES Psig. TEST RESULTS Number of Failures: 0 ,Test Time: 2.8 Hours. Number of valves tested 24 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: GOOD TEST. Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED.;' YES YES NO 24- HOUR NOTICE GIVEN YES YES NO Waived By: Witnessed By: BOBBY D. FOSTER FI-021L (Rev. 12/94) AWQIHHCD.XLS MEMORANDUM TO: THRU: FROM: David John~, ' Chairmafi ~ P. !. Supervisor John Spaulding~ ~etroleum Insp7 State of Alaska Alaska Oil and Gas Conservation Commission DATE: July 27,1995 FTLE NO: EWQLG3CD.doc SUBJECT: Diverter Function Test Nabors 22E BPX MPU MPF-53 PTD # 95-108 Thursday July 27, 1995' I witnessed the Diverter Function Test on Nabors 27E at BPX's MPU well MPF-53. The diverter is 20" with 105' of 10" vent line, the line is running down 2 sides of the pipe shed and is anchored to the pipe shed with permanent hangers. The ends of the vent lines are well marked and barricaded. Although the vent lines are in accordance with AC)GCC regulations, Nabors is doing a cost analysis on running a 16" straight vent under the pipe shed and extending out approximately 20'. This Line will be anchored to the pipe shed as well. Summary: I witnessed the successful diverter function test on Nabors 27E. Attachments: ALAS OIL AND GAS CONSERVATION COMMISSION TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 July 19, 1995 Tim Schofield, Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re; Milne Point Unit MPF-53 BP Exploration (Alaska), Inc. Permit No 95-108 Surf Loc 2028'NSL, 2572'WEL, Sec. 6, T13N, R10E, UM Btmhole Loc 386'NSL, 2356'WEL, Sec. 30, T14N, R10E, UM Dear Mr Schofield: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be ~leum field inspector 659-3607. David W. John,~ton Chairman BY ORDER OI T~MISSION /encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL .- 20 AAC 25.005 !la. Type of work Drill [] Redrilll-Illb. Type of well. Exploratoryl-] Stratigraphic Test I-I Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name ef Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska)/nc. 46 feet Mi/ne Point / Kuparuk River 3. Address 6. Property Designation Sands P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL ~ ,~C ~'~ /~ ,~'~ 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 ^^c 25.025) 2028' NSL, 2572' TEL, SEC 6, T13N, RIOE Milne Point Unit At top of productive interval 8. Well number Number 155' NSL, 2333' TEL, SEC 30, T14N, RIOE MPF-53 2S100302630-277 At total depth 9. Approximate spud date Amount 386' NSL, 2356' TEL, SEC 30, T14N, RIOE 07/25/95 $200,000. O0 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(UDandTVD) property line ADL 355018 2737 feet No Close Approach feet 5760 12467MD/7376 TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth ~ooo feet Maximum hole angle 65 o Maximum surface 2828 psig At total depth (TVD) 7045'/3536 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD 'I-VD MD TVD (include stage data) 30" 20" 91.1# NT8OLHE WELD 80' 32' 32' 112' 112' 160 sx AS(Approx.) 12-1/4" 9-5/8" 40# L-80 BTRC 6699' 31' 31' 6699' 4496' 1292 sx 'E', 250 sx 'G', 250 sx 'E' 8-1/2" 7" 26# L-80 BTRC 12451' 30' 30' 12451' 7376' 217sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface RECEIVED Intermediate Production ,Ji)l l,'~ Liner Perforation depth: measured _At~$!~0Jl.& 6as C0,~, true vertical A[~¢I~0;.: 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21.1 hereby cert~at the~fo~j~ and correct to the best of my knowledge Signed . T itl e Senior Drilling Engineer Date /u ' Commission Use Only Permit Number IAPI mber Approva. I date See cover letter <:~,~._/,,~ ~ 150.4:~_, ~ ~ .2_ ,5",,~' I '7./~./'~/~.~"- for other requirements Conditions of approval Samples required [] Yes ~ No Mud Icg required []Yes 1~ No Hydrogen sulfide measures [] Yes [] No Directional survey required [] Yes [] No Required working pressure for BOPE [] 2M; I-]3M; r-15M; I-I10M; I-I15M; Other: Original Signed By by order of Approved by David W. Johnston Commissioner me commission Date///5 Form 10-401 Rev. 12-1-85 Submit in triplicate I Well Name: Well Plan I MPF-53 Summary ]Type of Well (producer or injector): ] KupamkProducer I Surface Location: 2028' FSL 2572' FEL Sec 06 T13N R10E UM., AK. Target Location: 155' FSL 2333' FEL Sec 30 T14N R10E UM., AK. Bottom Hole 386' FSL 2356' FEL Sec 30 T14N R10E UM., AK. Location: AFENumber: 1330118I I Estimated Start Date: ]July 20'1995 Rig: I Nabors 27E Operating days to drill [17 and case: I 12451' [ ITVD: [7376' BKB I IKBE: 146' IWell Design (conventional, slimhole, etc.): Ultra Shmhole, 7" Longstring Formation Markers: Formation Tops MD TVD Formation Pressure/EMW base permafrost 1795' 1795' n/a MA n/a n/a n/a NA (Top Schrader) 5860' 4000' 1687 psig / 8.0 ppg OA ' ' 1725 psig / 8.0 ppg Base Schrader Bluff 6499' 4315' 1795 psig / 8.0 ppg Top HRZ 11506' 6609' n/a Base HRZ 11622' 6699' n/a Kupark D Shale 11845' 6879' n/a Top Kuparuk A 112063' 7045' 3536 psig / 9.6 ppg Target 12063' 7045' 3536 psig / 9.6 ppg Total Depth 12451' 7376' n/a Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Con Length Top Btm S i z e Tb g n MD/TVD MD/TVD O.D. 30" 20" 91.1# NTSOLHE weld 80' 32/32 112/112 12 1/4" 9 5/8" 40# L-80 btrc 6675' 31/31 6699/4496 8 1/2" 7" 26# L-80 nscc 12451' 30/30 12451/7376 N/A (tbg) 2-7/8" 6.5# L-80 EUE 11963' 29/29 11963/6963 8rd Internal yield pressure of the 7" 26g casing is 7240 psi. Worst case surface pressure would occur with a full column of gas to the reservoir at 7045' TVDSS. Maximum anticipated surface pressure in this case assuming a reservoir pressure of 3536 psi is 2828 psi, well below the internal yield pressure rating of the 7" casing. Logging Program: I Open Hole Logs: Surface Intermediate Final ICased Hole Logs: GR/Resistivity None LWD GRfResistivity/Neutron/Density None A gamma ray log will be obtained from surface to TD. Mud Logging is not required. Mud Program: Special design considerations None- LSND freshwater mud Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 50 15 8 10 9 8 to tO to to tO to to 9.6 90 35 15 30 10 15 Intermediate Mud Properties: N/A' [ Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Production Mud Properties: [ Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 40- 10 3 7 8.5 6-8 to to to to to to to 10.2 50 15 10 20 9.5 4-6 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: I 000' IMaximum Hole Angle: Close Approach Well: 65 degrees None There are no close approach wells for drilling MPF-53. Disposal: Cuttings Handling: CC2A Fluid Handling: The other wells on this pad are MPF-01, MPF-25, MPF-13, MPF-37, MPF-45, and MPF-46 (No. Point #1). MPF-46 has had it's annulus arctic packed making it unavailable for injection. Consequently the only annulus available for annular injection will be the 9-5/8" x 7" annulus on MPF-01, MPF-25, MPF-13, MPF 45, and MPF-45. The PEs may be perforating and fracing any of the wells on this pad while MPF45 is being drilled. Check with the PE supervisor prior to injecting waste fluid down any other annulus to ensure injection will not interfere with their operations. After cementing the 7" casing on this well, MPF-53, and allowing the cement to cure 6 hours the annulus may be used for fluid disposal. Ensure the annulus is freeze protected after injecting any freezable fluids. Annular Injection: All cuttings from this well (MPF-53) will require trucking to CC2 for processing and disposal. Fluids may be injected into the 7" x 9-5/8" annulus on MPF- 01, MPF-25, MPF-13 and MPF-37. MPF-45's annulus may be used after allowing the cement on the 7" casing cement job to cure 6 hours following CIP. AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED (BBL) VOL (BBL) Milne Point F-25 0 35,000 1/1/95-1'2/31/95 Milne Point F-13 0 35,000 1/1/95-12/31/95 Milne Point F-37 0 35,000 1/1/95- 1 2/31/95 FREEZE PROTECTION: Pay close attention to annulii being used for disposal so to avoid freezing. Sometimes the annulii are kept open by ensuring that an adequate volume (+60 bbls) is injected every 6-12 hours. This practice is more economical than pumping 60 bbls of diesel freeze protection every time the pumps are shut down; however, if this practice is used, it is important that the injection frequency into the annulus be adequate to prevent freeze ups -- the drillers must communicate to each other the last time the annunlus was injected into to avoid freezing. MP F-53 Proposed Summary of Operations o , 3. 4. 5. o . 10. 11. 12. 13. 14. 15. 16. 17. Drill and Set 20" Conductor. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. Prepare location for rig move. MIRU Nabors 27E drilling rig. NU and function test 20" Diverter system. Build Spud Mud. Drill a 12-1/4" surface hole to 6699' md (4399' tvd). (Note: This hole section will be LWD logged with GR/Res). Run and cement 9-5/8" casing to surface. ND 20" Diverter, NU and Test 13-5/8" BOPE. Run Wear Bushing. RIH w/PDC bit and PDM (motor). Test the 9-5/8" casing to 3500 psig. Drill out float equipment and 10 feet of new fOrmation, Perform a LOT. Drill 8-1/2" hole to TD at 12451' MD (7377' TVD). (Note: This hole section will be logged LWD with Triple Combo (GR/Res/Neu/Dens). Pull Wear Bushing, and Change Pipe Rams to 7". Run and Cement 7" casing. Test casing to 3500 psi and freeze protect wellbore to 2000' TVD with diesel. ND BOPE and NU dry hole tree. Release rig to MPF-61. Note: This well will be perforated, hydraulically fractured and cleaned out with coiled tubing without a rig and prior to running the ESP completion. Following the stimulation the well will be left with a retrievable bridge plug (RBP) set 500' above the perforations and kill weight brine in the wellbore. MIRU workover completion unit. ND dry hole tree. NU BOPs and test. PU and RIH with 2-7/8" EUE 8rd tubing with RBP retrieving tool. Release RBP and POH standing back tubing. RIH with Electric Submersible Pump (ESP) completion on 2-7/8" EUE 8rd tubing. Set BPV. ND BOPE and NU tree. Pull BPV and set two way check. Test tree. RDMO with workover/completion rig. MPF-53 WELL 9-5/8" SURFACE CASING CEMENT PROGRAM - HALLIBURTON CASING SIZE: 9-5/8" CIRC. TEMP 80 deg F at 4000' TVDSS. SPACER: 75 bbls fresh water. LEAD CEMENT TYPE: Type E Permafrost ADDITIVES: Retarder WEIGHT: 12.0 ppg YIELD: 2.17 ft3/sx MIX WATER: 11.63 gal/sk APPROX #SACKS: 1292 THICKENING TIME: Greater than 4 hrs at 50° F. TAIL CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.2% Halad-344, 2.0% CaC12 WEIGHT: 15.8 ppg APPROX #SACKS' 250 FLUID LOSS: 100-150 cc YIELD: 1.15 ft3/sx MIX WATER: 5.0 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. FREE WATER: 0 TOP JOB CEMENT TYPE: Type E Permafrost ADDITIVES: Retarder WEIGHT: 12.0 ppg YIELD: 2.17 cu ft/sk. MIX WATER: 11.63 gal/sk APPROX NO SACKS: 250 CENTRALIZER PLACEMENT: 1. 1 Bowspring centralizer per joint of 9-5/8" casing on the bottom 10 joints above the FS. 2. Place all centralizers in middle of joints using stop collars. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix slurry on the fly -- batch mixing is not necessary. CEMENT VOLUME: 1. The Tail Slurry volume is calculated to cover 623' md above the 9-5/8" Casing Shoe with 30% excess. 2. The Lead Slurry volume is calculated to cover from the top of the Tail Slurry to 1500' md with 30% excess and from 1500' md to surface with 100% excess. 4. 80'md 9-5/8", 40//capacity for float joints. 5. Top Job Cement Volume is 250 sacks. MPF-53 7" PRODUCTION CASING CEMENT PROGRAM- HALLIBURTON THIS WILL BE A SINGLE STAGE CEMENT JOB ACROSS THE KUPARUK INTERVAL ONLY: CIRC. TEMP: 140° F BHST 170 deg F at 7260' TVDSS. SPACER: 20 bbls fresh water. 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344 WEIGHT: 15.8ppg YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk APPROX 4/SACKS: 217 THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F FLUID LOSS: < 50cc/30 min @ 140° F FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: 1. 7-1/8"" x 8-1/4" Straight Blade Turbulators -- two per joint on the bottom 17 joints of 7" Casing (34 total). This will cover 300' above the top of the Kuparuk sands. 2. Run one 7-1/8" x 8-1/4" Straight Blade Turbulator inside the 9-5/8"casing shoe. 3. Total 7-1/8"" x 8-1/4" Straight Blade Turbulators needed is 35. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-10 bpm. Batch mixing is not necessary. CEMENT VOLUME: 1. The cement volume is calculated to cover 1000' md above the top of the Kupamk Sands with 30% excess over a guage hole. DRILLING HAZARDS AND RISKS: See the Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for a general recap of the original No Point well (F-46) recently drilled by BPX. There are also several BHLs drilled from L-pad that can give information relavent F-pad drilling. There will be no close approaches while drilling this well. The gravel on F-pad has only recently been laid. Although frozen the gravel has a relatively high moisture content and has not been compacted. Recently the MPU asset has decided to move N27E from MPF-pad to MPL-pad before~break-up. Ensure the rig crews are aware of the unstable nature of the pad before and during break-up conditions. The MPU Construction group will probably be installing VSMs on this pad as MPF-53 is drilled. Ensure the rig crews and contractors associated with rig operations use caution and are aware of the progress and status of operations with regard to VSM installations while working on this pad. The MPU PE group will be perforating, hydraulic fracturing and cleaning out wells with a cmpletion rig shortly after the rig drills and completes them. This will make the near rig area congested and as a result hazardous. Ensure personnel use caution moving around adjacent production activities. Check with the PE supervisor prior to injecting fluids down an annulus on any wells that the PE group may be working on. Lost Circulation: No Point 4/1 (MPF-46) did not experience any lost circulation while drilling the only well drilled to date on F-pad. The max mud weight reached on that well was 10.3 ppg. They did experience some mud losses while cementing 7" casing. Lost circulation while drilling the production interval has been a problem on 4 different L-pad wells, the closest pad to F-pad, although none of them have BHLs in the F-pad drilling area. The Kuparuk sands and a number of shallower intervals typically are highly fractured. Wells L-07, L-08, L-09 and L- 11 lost varying amounts of mud (from 70 to 220 bbls) drilling through or near the top of the Kupamk sands. Be prepared to treat these losses initially with LCM treatments. Stuck Pipe Potential: While drilling No Point #1 (MPF-46) the 6" B HA was stuck in 8-1/2" hole section for several hours at 6882' ss (13608' MD) before jarring free. They became stuck after tripping back to bottom following a bit trip. Lack of proper hole cleaning parameters appears to have contributed to this problem. Stuck pipe has occurred on 3 L-pad wells at the interface between the Kalubik and D-shale (called the Kuparuk cap rock). These wells and the corresponding depths at which they were stuck were: L-06 @ 6871' ss, L-07 @ 6859' ss, L-11 @ 6835' ss. There have been no stuck pipe incidents while drilling the initial four (4) wells with Nabors 27E on MPF-pad. Kick Tolerance: The surface casing setting depth for this well allows a kick tolerance of 88.6 bbl influx (Gas) based on a 12.5 ppg LOT at the 9-5/8" casing shoe and a estimated reservoir pressure of 3536 psig (9.6 ppg equivalent MW). Trip Schedules are required for all trips. All trips will be performed with a trip tank or one pit isolated for use as a trip tank. Formation Pressure: The maximum expected pore pressure for this well is 9.6 ppg EMW (3536 psi @ 7085' TVD). There has been no injection in this particular fault block. ]3PX-Shomeol Senvices ~i[ling Alasko :S~o~ce Plane', Zone4 Mi the P-t : MPF SIo-t: : MPF-S3 As-BuiVc Welipo~ch' VERTIC~ Vl['1~ SC/4.E 500 f't. / DIV]S,[Iq TV1) RE['; ;,~I_LI-EA0 VERTICAL SECTION RE[': WELLFEAD cl~o eo NI) iii iN 12-27 4316 MPK-53 Wp3 C~TIC.~ P~l I~TA Ilo~,c~t h~r~e "[VD lo-gel (12/29/941 7046 NS E;J 6~d X C~:d ¥ J 6044l 6,8 8687 N 806 E 542~47 C.~S Ih6 F:~IINI [] 14D ]nc Az~ TV]] N/S ~ in 198 000 0,00 1':~ 0 9 5/8 in ~ 64~E~] 1.45 4404 4123 H~LIBURTEN 7/1~ I I'~ FI[RIZ[~TAL VI[W C'Tl:?tC ~ :SC~E 503 ft. / l]]¥]Sll~ SLeVEY I;CF: TVD 737665 ~ 1845107 VS 8921 JO5 N/S 8018~7 N E/~ L936J9 E Dote I~otted Dote 7/: ~ 0 ~00 1000 1~30 8000 85OO BPX-Shomed Semvices ]31,~itling Alesko Stele Plone'. Zone4 Miine I:)t:: MPF Slot '. MPF-S3 As-]~uiit Weltpoth : MPF-53 Wp3 VEDTI~ ¥1EN SC/~E 500 Ft. / TV1) REF: WELLI-CAB VI~TI~ S[CTIEI, t DEr: ~LLI-CAD 6610 .. . 7377-- O~TICAL Pg]N1 DATA 4088 1,40 $000 0 N 0 E 140 ~lL:'g8 '3g N I E t.-~O ~ ~ N 6 r 1.45 3045 IL:~7 N 31 E 1.45 4046 3-36t N 85 E 1.45 4316 3937 N gg [ 1.45 ~ 7610 N 1(~9 E 0.07 6770 13.00 VCRTIC~ SECTION I I I 6~ 7CCX] 7500 9607 N L~36 E lorge't (1;~/~/04> 7046 [3(::~7 N ~ [ ~4['J47 6044168 C/k~IN5 POINT 1]ATA J I ~ ]nc Az; TVD N/S S.~ 0.00 000 S'=JB 0 N 0 E ~ (:~.88 1.45 4404 4l~3 N 44.l~g J~ 11~51 I, ti) 4~'..~ ~ 11.t51 38-18 ! Ilk--'~ 140 EI-FZ ~ 13747 ~D ~'~.0(] ~ ~1845ND ~KUD (IE/L::9/'~4) / TKI, JA~ '~oo@ 12151 ~o g k~:x,,.,,.~ PROq3SE D BH_ TVD 73766'5 1,4D 1~45] 07 VS 8g~l N/S 801867 N E/V L:05. i 9 E Dote F~o~ted i]~ec~ed By ~:~:x'oved By Ebte ]}PX-Shor, eol {}er, vices ]3milling AIo, sl-<o Sto,--t:e Plo, ne: Zor',e4 Mi the P-t: ~ MPF Slot', MPF-S3 As-Buii-t Weiipo-th : MPF-53 Wp3 6500m 6ZOO 6770 7131 7~77 VE]TTICAL VIEW ~_~_E ~00 f-t. / DIVISION TVD R~ZF: WEI_L~EAD ~I~3~TICAI_ ~CTIE]N REF: WCLLHEAD 836g 044'3 VERTI~ SECTI[~i PL~: .3g~ 11451 MI) 03 8 11506 MI) 9.89 8 11551 I~ ,~ ~ 11651 ~ ~ 11710 ~D ~17 ~~ I 7/1'3/95 ] 1:54 OM HALLI3t_Ig-[EN .. Survey Reference: WFJI.HEAD Reference Wcxld Coordinates: Lat. 70.30.28 N - Long. 149.39.23 W Reference GRID System: Alaska State Plane Zone: Alasio 4 Reference GRID Co<xdinates: (ft): 6035480.75 N 5419!)0.05 E North Aligned To: TRUE NORTH Vertical Section Reference: WF.I .I ~HEAD Closure Reference: WEIJ.HEAD TVD Reference: WF] J .HEAD Halliburton Energy Services - Drilling Systems PSL Proposal Report Calculated using the Minimum Curvature Method Computed using WIN-CADDS REV2. I.B Vertical Section Plane: 1.32 deg. 'Page I Date: 7113/95 Time: 9:40 am Wellpath ID: MPF-53Wp3 Last Revision: 7113/95 _. BPX-Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPF Slot: MPF-53 As-Built Wellpath: MPF-53 Wp3 Measured Incl Drift Subsea TVD Co~r:;e T O T A L Depth Dir. Deplh Lenglh Rectangular Offsets (l~) (deg.) (deg.) (fl) (fl) (ft) (ft) (ft) GRID Coordinates Northing Fasting (fl) Closure Vertical Build Walk DLS Cum. Expected Total Max Hor Min Hor Dir. Vert Disc Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error (ft) (deg.) (ft) (dgtl00ft) (dg/100ft) (dg/100ft) (deg) (fl) (ft) (ft) (ft) (deg.) (ft) Survey Tool TIE IN 0.00 0.00 0.00 -45.90 0.00 0.00 0.00N CASING POINT OD = 20 in, ID = 19.12 in, Weight = '94.00 lb/ft. 158.00 0.00 0.00 112.10 158.00 158,00 0.00N KOP ! START OF BUILD @ 1.00 deg/100 ft 700.00 0.00 0.00 654.10 700.00 542.00 0.00N 0.00E 6035480.75 541990.05 0.00E 6035480.75 541990.05 0.00E 6035480.75 541990.05 0.0C@ 0.00 0.00 0.0C@ 0.00 0.00 0.0(@ 0.00 0.00 0.00 0.00 0.00 0.0 0.00N 0.00 0.00 0.00 0.0 0.00N 0.00 0.00 0.00 0.0 0.00N 0.00 E 0.00 0.00 0.00 0.00 BPHM-PBD 0.00 E 0.00 0.00 0.00 0.00 BPHM-PBD 0.00 E 2.63 2.63 0.00 0.98 BPHM-PBD 800.00 1.00 1.40 754.09 799.99 100,00 0.87N 900.00 2.00 1.40 854.06 899.96 I00.00 3.49N START OF BUILD @ 2.00 deg/100 ft 1000.00 3.00 1.40 953.96 999.86 100.00 7.85N 0.02E 6035481.62 541990.07 0.09E 6035484.24 541990.12 0.87@ 1.40 0.87 3.4~@ 1.40 3.49 1.00 0.00 1.00 0.00 0.19E 6035488.60 541990.20 7.85@ 1.40 7.85 1.00 0.00 1.00 1.0 0.87N 1.00 2.0 3.49N 1.00 3.0 7.85N 0.02E 2.81 2.81 271.40 1.13 BPHM-PBD 0.09E 3.01 3.00 271.40 1.28 BPHM-PBD 0.19E 3.22 3.20 271.40 1.44 BPHM-PBD 1100.00 5.00 1.40 1053.71 1099.61 100.00 14.82N 1200.00 7.00 1.40 1153.16 1199.06 100.00 25.27N START OF BUILD @ 2.50 deg/100 fl 1300.00 9.00 1.40 1252.18 1298.08 100.00 39.18N 0.36E 6035495.57 541990.33 14.83@ 1.40 14.83 0.62E 6035506.02 541990.53 25.2~@ 1.40 25.28 2.00 0.00 2.00 5.0 14.82N 2.00 0.00 2.00 7.0 25.27N 0.96E 6035519.93 541990.79 39.2C@ 1.40 39.20 2.00 0.00 2.00 9.0 39.18N 0.36E 3.47 3.41 271.40 1.60 BPHM-PBD 0.62E 3.79 3.62 271.40 1.77 BPHM-PBD 0.97E 4.18 3.84 271.40 1.95 BPHM-PBD 1400.00 11.50 1.40 1350.58 1396.48 100.00 56.97N 1500.00 14.00 1.40 1448.11 1494.01 100.00 79.03N 1600.00 16.50 1.40 1544.58 1590.48 100.00 105.33N 1.39E 6035537.72 541991.12 56.9~@ 1.40 56.99 1.93E 6035559.78 541991.54 79.0~@ 1.40 79.06 2.57E 6035586.08 541992.03 105.3~@ 1.40 105.36 2.50 0.00 2.50 11.5 56.97N 2.50 0.00 2.50 14.0 79.03N 2.50 0.00 2.50 16.5 105.33N 1.41E 4.69 4.07 271.40 2.15 BPHM-PBD 1.95E 5.35 4.31 271.40 2.36 BPHM-PBD 2.61E 6.16 4.56 271.40 2.60 BPHM-PBD 1700.00 19.00 1.40 1639.81 1685.71 100.00 135.80N ' 3.32E 6035616.55 541992.60 135.8'1@ 1.40 135.84 2.50 0.00 END OF BUILD 1780.00 21.00 1.40 1714.98 1760.88 80.00 163.15N 3.99E 6035643.91 541993.12 163.2£@ 1.40 163,20 2.50 0.00 B. Permafrost 1817.51 21.00 1.40 1750.00 1795.90 37.51 176.59N 4.32E 6035657.34 541993.37 176.65@ 1.40 176.65 0.00 0.00 2.50 19.0 135.80N 3.37E 7.14 4.82 271.40 2.85 BPHM-PBD 2.50 21.0 163.15N 4.05E 8.03 5.04 271.40 3.07 BPHM-PBD 0.00 21.0 176.59N 4.39E 8.45 5.16 271.40 3.14 BPHM-PBD START OF CURVE @ 3.00 deg/100 ft 2036.13 21,00 1.40 1954.10 2000.00 218.62 254.92N 2136.13 24.00 1.41 '2046.48 2092.38 100.00 293.17N 2236.13 27.00 1.42 2136.73 2182.63 100.00 336.20N 6.23E 6035735.67 541994.84 254.9g@ 1.40 254.99 0.00 0.00 7.17E 6035773.92 541995.56 293.2e@ 1.40 293,26 3.00 0.01 8.23E 6035816.96 541996.38 336.3£@ 1.40 336,30 3.00 0.01 0.00 21.0 254.91N 6.34E 11.03 5.94 271.40 3.56 BPHM-PBD 3.00 24.0 293.16N 7.31E 12.39 6.24 271.40 3.91 BPHM-PBD 3.00 27.0 336.20N 8.40E 13.91 6.55 271.40 4.29 BPHM-PBD 2336.13 30.00 1.42 2224.60 2270.50 100.00 383.90N 9.41E 6035864.65 541997.29 384.01@ 1.40 384.01 3.00 0.01 2436.13 33.00 1.42 2309.85 2355.75 100.00 436.12N 10.71E 6035916.88 541998.29 436.215~ 1.41 436.26 3.00 0.00 3.00 30.0 383.89N 9.62E 15.60 6.87 271.41 4.71 BPHM-PBD 3.00 33.0 436.12N 10.96 E 17.45 7.21 271.41 5.16 BPtlM-PBD Halliburton Energy Services - Drilling Systems PSL Proposal Report Page 2 Date: 7/13/95 Wellpa~h ID: MPF-53Wp,3 Measured lad Drift Subsea TVD Course T O T A L GRID Coordinates Depth Dir. Depth Length Rectangular Offsets Northing Easting (~t) (aeg.) (deg.) (ft) (t~) (et) (ft) (a) (ft) (~) 2536.13 36.00 1.43 2392.26 2438.16 100.00 492.74N 12.12E 6035973.50541999.38 492.8~@ 1.41 492.89 2636.13 39.00 1.43 2471.58 2517.48 100.00 553.59N 13.64E 6036034.35542000.56 553.7(@ 1.41 553.76 2736.13 42.00 1.43 2547.61 2593.51 100.00 618.51N 15.26E 6036099.27542001.81 618.7£@ 1.41 618.70 2836.13 45.00 1.44 2620.14 2666.04 100.00 687.31N 16.99E 6036168.08542003.15 687.52@ 1.42 687.52 2936.13 48.00 1.44 2688.97 2734.87 100.00 759.82N 18.81E 6036240.59542004.56 760.05@ 1.42 760.05 3036.13 81.00 1.44 2753.91 2799.81 100.00 835.83N 20.72E 6036316.60542006.04 836.0g@ 1.42 836.08 3136.13 54.00 1.44 2814.78 2860.68 100.00 915.13N 22.72E 6036395.90542007.59 915.41@ 1.42 915.41 3236.13 57.00 1.45 2871.41 2917.31 100.00 997.51N 24.79E 6036478.28542009.20 997.82@ 1.42 997.81 3336.13 60.00 1.45 2923.65 2969.55 100.00 1082.73N 26.95E 6036563.51 542010.87 1083.07@ 1.43 1083.07 3436.13 63.00 1.45 2971.37 3017.27 1O0.00 1170.58N 29.17E 6036651.36542012.60 1170.94@ 1.43 1170.94 END OF CURVE 3498.68 64.88 1.45 2998.84 3044.74 62.55 1226.74N 30.59E 6036707.52542013.70 1227.12@ 1.43 1227.12 T. Shrader Bluff 5856.71 64.88 1.45 4000.00 4045.90 2358.03 3361.01N 84.61E 6038841.85 542055.64 3362.07@ 1.44 3362.06 B. Schrader Bluff 6492.64 64.88 1.45 4270.00 4315.90 635.93 3936.59N 99.18E 6039417.45542066.95 3937.84@ 1.44 3937.83 CASING POINT OD = 9 5/8 in, ID = 8.84 in, Weight = 40.00 lb/ft. 6699.00 64.88 1.45 4357.61 4403.51 206.36 4123.37N 103.91E 6039604.23542070.62 4124.6~@ 1.44 4124.67 START OF CURVE @ 2.50 deg/lO0 ft 10551.49 64.88 1.45 5993.28 6039.18 3852.49 7610.27N 192.18E 6043091.24542139.09 7612.6g@ 1.45 7612.68 10651.49 62.38 1.37 6037.69 6083.59 100.00' 7699.82N 194.38E 6043180.80542140.79 7702.2~@ 1.45 7702.26 10751.49 59.88 1.28 6085.98 6131.88 100.00 7787.36N 196.40E 6043268.34542142.31 7789.84@ 1.44 7789.82 10851.49 57.38 1.19 6138.03 6183.93 100.00 7872.72N 198.25E 6043353.69542143.67 7875.21@ 1.44 7875.20 10951.49 54.88 1.10 6193.75 6239.65 100.00. 7955.73N 199.91E 6043436.70542144.86 7958.24@1.44 7958.22 11051.49 52.38 0.99 6253.05 6298.95 100.00 8036.23N 201.38E 6043517.20542145.87 8038.75@ 1.44 8038.74 11151.49 49.88 0.89 6315.79 6361.69 100.00 8114.07N 202.65E 6043595.04542146.71 8116.6£@ 1.43 8116.59 11251.49 47.39 0,77 6381.87 6427.77 100.00 8189.11N 203.74E 6043670.08542147.37 8191.64@ 1.43 8191.63 11351.49 44.89 0.64 6451.16 6497.06 100.00 8261.20N 204.63E 6043742.16542147.85 8263.73@ 1.42 8263.72 11451.49 42.39 0.50 6523.53 6569.43 100.00 8330.20N 205.32E 6043811.16542148.15 8332.73@ 1.41 8332.72 THRZ 11505.70 41.03 0.42 6564.00 6609.90 54.21 8366.27N 205.61E 6043847.23 542148.23 8368.8£@ 1.41 8368.79 11551.49 39.89 0.35 6598.83 6644.73 45.79 8395.98N 205.81E 6043876.94 542148.26 8398.5£@ 1.40 8398.49 BHRZ 11622.48 38.12 0.23 6654.00 6699.90 70.99 8440.66N 206.04E 6043921.61 542148.24 8443.17@ 1.40 8443.17 11651.49 37.39 0.18 6676.93 6722.83 29.01 8458.42N 206.10E 6043939.37 542148.20 8460.93@ 1.40 8460.92 MKI9 11710.16 35.93 0.07 6724.00 6769.90 58.67 8493.45N 206.18E 6043974.40542148.08 8495.95@ 1.39 8495.95 END OF CURVE 11747.31 35.00 0.00 6754.25 6800.15 37.15 8515.00N 206.19E 6043995.95542147.97 8517.5£@ 1.39 8517.49 11844.66 35.00 0.00 6834.00 6879.90 97.35 8570.84N 206.19E 6044051.78542147.66 8573.32@ 1.38 8573.32 TKUC 12009.46 35.00 0.00 6969.00 7014.90 164.80 8665.37N 206.19E 6044146.30542147.12 8667.82@ 1.36 8667.82 Closure Vertical Build Walk DLS Cum. Expected Total Max Hot Min Hor Dh7. Ve~ Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error (ft) (deg,) (ft) (dg/100ft) (dg/10Oft) (dg/100ft) (deg) (ft) (ft) (ft) (ft) (deg.) (ft) Survey Tool 3.00 0.00 3.00 0.00 3.00 0.00 3.00 36.0 492.73N 12.42E 19.45 7.56 271.41 5.66 BPHM-PBD 3.00 39.0 553.58N 14.00E 21.61 7.91 271.41 6.19 BPHM-PBD 3.00 42.0 618.50N 15.70E 23.90 8.27 271.42 6.76 BPHM-PBD 3.00 3.00 3.00 0.00 0.00 0.00 3.00 45.0 687.30N 17.50E 26.34 8.63 271.42 7.38 BPHM-PBD 3.00 48.0 759.81N 19.40E 28.90 8.98 271.42 8.04 BPHM-PBD 3.00 51.0 835.81N 21.41E 31.58 9.33 271.42 8.74 BPHM-PBD 3.00 0.00 3.00 0.00 3.00 0.00 3.00 54.0 915.11N 23.51E 34.38 9.67 271.42 9.48 BPHM-PBD 3.00 57.0 997.48N 25.69E 37.29 10.00 271.43 10.26 BPHM-PBD 3,00 60.0 1082.71N 27.96E 40.29 10.30 271.43 11.09 BPHM-PBD 3.00 0.00 3.00 63.0 1170.55N 30.30E 43.39 10.59 271.43 11.94 BPHM-PBD 3.00 0.00 3.00 64.9 1226.71N 31.80E 45.36 10.76 271.43 12.49 BPHM-PBD 0.00 0.00 0.00 64.9 3360.90N 88.82E 119.97 20.94 271.44 32.27 BPHM-PBD -2.50 -0.08 -2.50 -0.09 -2.50 -0.09 -2.50 -0.10 -2.50 -0.10 -2.50 -0.11 -2.50 -0.12 -2.50 -0.13 -2.50 -0.14 0.00 64.9 3936.47N 104.19E 140.13 23.72 271.44 37.83 BPHM-PBD 0.00 64.9 4123.37N 103.91E 0.00 0.00 0.00 0.00 BPHM-PBD 0.00 64.9 7610.01N 202.33E 268.89 41.48 271.45 73.77 BPHM-PBD 2.50 67.4 7699.56N 204.64E 272.00 42.26 271.45 74.45 BPHM-PBD 2.50 69.9 7787.10N 206.77E 275.03 43.08 271.44 75.08 BPHM-PBD 2.50 72.4 7872.46N 208.70E 277.98 43.94 271.44 75.65 BPHM-PBD 2.50 74.9 7955.46N 210.44E 280.85 44.83 271.44 76.18 BPHM-PBD 2.50 77.4 8035.96N 211.98E 283.63 45.75 271.43 76.65 BPHM-PBD 2.50 79.9 8113.81N 213.31E 286.31 46.69 271.42 77.07 BPHM-PBD 2.50 82.4 8188.84N 214.44E 288.89 47.63 271.42 77.44 BPHM-PBD 2.50 84.9 8260.93N 215.36E 291.37 48.58 271.41 77.75 BPHM-PBD 2.50 87.4 8329.93N 216.08E 293.74 49.53 271.40 78.02 BPHM-PBD -2.50 -0.15 -2.50 -0.16 -2.50 -0.17 -2.5O -0.18 -2.50 -0.18 -2.50 -0.20 2.50 88.7 8366.00N 216.38E 294.99 50.05 271.40 78.16 BPHM-PBD 2.50 89.9 8395.71N 216.59E 296.02 50.48 271.40 78.26 BPHM-PBD 2.50 91.7 8440.39N 216.82E 297.56 51.14 271.39 78.39 BPHM-PBD 2.50 92.4 8458.15N 216.89E 298.18 51.41 271.39 78.44 BPHM-PBD 2.50 93.8 8493.18N 216.97E 299.39 51.95 271.38 78.53 BPHM-PBD 2.50 94.8 8514.73N 216.98E 300.14 52.28 271.38 78.58 BPHM-PBD 0.00 0.00 0.00 94.8 8570.57N 216.98E 302.10 52.81 271.37 78.96 BPHM-PBD 0.00 94.8 8665.10N 216.98E 305.42 53.70 271.36 79.59 BPHM-PBD Halliburton Energy Services - Drilling Systems PSL Proposal Report Page 3 Date: 7/13195 Wellpath ID: MPF-53Wp3 Measured Ind Drift Subsea TVD Cc~rs¢ T O T A L GRID Coordinates Closure Vertical Build Walk DLS Cum. Expected To~al Max Ho~ Min Ho~ Dir. Vert Survey Tool Deixh Dir. Dcp(h Length Rectangular Offsets Northing Easting Dist. Dir. Section Rate Rate Dogleg Rectangular Co.ds Errc~ Erro~ Max Err Erro~ (R) (deg.) (deg.) (ft) (fl) (ft) (R) (R) (ft) (ft) (ft) (deg.) (R) (dg/10Oft) (dg/100ft) (dg/100ft) (deg) (R) (ft) (R) (ft) (deg.) (ft) 12019.23 35.00 0.00 6977.00 7022.90 9.77 8670.97N 206.19E 6044151.90542147.09 8673.42@ 1.36 8673.42 0.00 0.00 0.00 94.8 8670.70N 216.98E 305.62 53.75 271.35 79.62 BPHM-PBD Target (12/29/94) / TKUA3 12047.31 35.00 0.00 7000.00 7045.90 28.08 8687.08N' 206.19E 6044168.00542147.00 8689.52@ 1.36 8689.52 0.00 0.00 0.00 94.8 8686.81N 216.98E 306.19 53.90 271.35 79.73 BPHM-PBD TKUA2 12064.40 35.00 0.00 7014.00 7059.90 17.09 8696.88N 206.19E 6044177.80542146.94 8699.32@ 1.36 8699.32 0.00 0.00 0.00 94.8 8696.61N 216.98E 306.53 53.99 271.35 79.80 BPHM-PBD TKUA1 12082.71 35.00 0.00 7029.00 7074.90 18.31 8707.38N 206.19E 6044188.30542146.88 8709.82@ 1.36 8709.82 0.00 0.00 0.00 94.8 8707.11N 216.98E 306.90 54.09 271.35 79.87 BPHM-PBD 12145.46 35.00 0.00 7080.40 7126.30 62.75 8743.37N 206.19E 6044224.29542146.68 8745.8£@ 1.35 8745.80 0.00 0.00 0.00 94.8 8743.10N 216.98E 308.16 54.43 271.34 80.11 BPHM-PBD B. Kuparuk 12151.07 35.00 0.00 7085.00 7130.90 5.6/, 8746.59N 206.19E 6044227.51 542146.66 8749.02@ 1.35 8749.02 0.00 0.00 0.00 94.8 8746.32N 216.98E 308.28 54.46 271.34 80.13 BPHM-PBD 12451.07 35.00 0.00 7330.75 7376.65 300.00 8918.67N 206.19E 6044399.57 542145.69 8921.05@ 1.32 8921.05 0.00 0.00 0.00 94.8 8918.40N 216.98E 314.33 56.07 271.32 81.28 BPHM-PBD ~PX-Shomeot Semvice~ ~mitling , Aleslqa SteRe Plone', Zone4 Mi~ne Pt ' MPF Slo~' MPF-%3 As-~ui[~ Welipo~h '~PF-53 7/13,~ II 37 on HALLIBLRTDN I-OR1~TAL VIEW (TR'LE SCALE 500 ft. / D]X/]SIE]IN SIJRVEY REF: ~LL~A]D 400 JWCLLS S1A'IUS No POnt Nc~I FLDW~IEi ~--01 Dote Creoted By ' MPF-53 Wp3 24O 310 lgO 4C0 170 2O 140 I'D ID] I00 ~'?~-°[:3 ~1684 4~DO] ~LLS STAlUS Do~e ltnlliburton Travelling Cylinder Report Conqmted using 14qN-CA DD,V RE1/2.1. B Normal Plane Method Page 1 Date: 7/13/95 Time: 11:51 am REFERENCE WELL: BPX-Shared Sen'ices Drilling Alaska State Plane: Zone4 Milne Pt: MPF Slot: MPF-53 As-Built Wellpath: MPF-53 Wp3 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Inten, al Step Depth 50.00 ft.(MD) From 0.00 To 12451.07 ft.(MD) All Directions using BP Highside Method in Dee. Deg. Ali Depths and Distance are in FEET All distances are between EXPECTED Positions Close Approach Status Offset Flowing Zone Well Safety Min. Clear Spread MD TVD No Point N 119.1 122.3 250 250 MPF-45 Rig 45.5 53.6 650 650 MPF-37 Gyr 97.2 110.3 1050 1050 MPF-25 RIG 195.4 204.2 700 700 MPF-13 GY 286.0 294.8 700 700 MPF-01 Gyr 377.8 386.5 700 700 Flowing Shut-in Enter Enter Safety Safety Shut-in Danger Dist Dist Zone Zone MD MD 3.7 I}.6 9.8 1.6 15.8 2.6 10.5 1.8 10.5 1.8 10.5 1.8 Exit Exit Close Danger Shut-in Approach Zone Zone Status MD MD OK OK OK OK OK OK Norm'al Plane Method REFERENCE lq/El.L: BPX-Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPF Slot: MPF-53 As-Built Wcllpath: MPF-53 Wp3 N/S and E/W are measured from tile WELLHEAD TVD is measured from tile WELLHEAD Interval Step Depth 50.00 ft.(MD) From 0.00 To 12451.117 ft.(MD) All Directions using BP Highside Method in Dec. Deg. All Depths and Distance are in FEET All distances arc between EXPECTED Positions Slot Wcllpath MPF-46 As Built No Point No. 1 Closest Points Distance Direction RcfMD RefTVD 125.35 277.1)4 50.1)0 50.00 9514.57 265.48 10500.00 6017.32 Sep Factor 132.1 10.7 MPF-45 As-Built MPF-45 RigMwd 59.18 216.45 400.00 400.00 1093.81 266.79 6200.00 4191.65 15.9 4.0 MPF-37 As-Built MPF-37 Gyro IHRm 118.61 216.84 450.00 450.00 2258.11 266.88 7100.00 4573.77 27.2 7.4 MPF-25 As-Built MPF-25 RIGBHAMWD MPF-13 As-Built MPF -13 GYROIHRM 209.37 215.86 200.00 200.00 3611.06 263.41 74(}0.00 4701.14 299.86 215.78 50.00 50.00 6383.96 259.42 781}0.00 4870.97 MPF-1 As-Built MPF-01Gyro-IHRM 390.21 215.65 50.00 50.00 5177.85 265.02 50110.00 3682.16 74.9 8.6 252.6 17.5 379.9 19.8 WELL PERMIT CHECKLIST FIELD & POOL ADMINISTRATION COMPANY PROGRAM: exp [] dev~ redrll [] aery [] UNIT# ENGINEERING 1. Permit fee attached ................... 2. Lease number appropriate ................ 3. Unique well name and number .............. tiY 4. Well located in a defined pool .............. Y 5. Well located proper distance from drlg unit boundary... 6. Well located proper distance from other wells ..... · 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval.. 13. Can permit be approved before 15-day wait ....... APPR DATE 14. Conductor string provided ............... 15. Surface casing protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate ..................... 26. .BOPE press rating adequate; test to ~OOO psig.~ 27. Choke manifold complies w/API RP-53 (May 84) ...... 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............. GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures 31. Data presented on potential overpressure zones ..... 32. Seismic analysis Qf shallow gas zones .......... 33. Seabed condition survey (if off-shore) ........ 34. Contact name/phone for weekly progress reports . . [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: W/~o - A:',FORMS~cheklist rev 03/9~ Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organiZe this category of information. = Subfile 2 is type JIS TAPE HEADER PRUDHOE BaY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA MWD RUN 4 JOB NUMBER: AK-MM-950736 LOGGING ENGINEER: M. HANIK OPERATOR WITNESS: J. ROBERTSON SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE MPF-53 500292257800 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 16-OCT-96 6 13N 10E 2028 2572 48.40 46.90 13.40 CASING · DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 20.000 110.0 3RD STRING 12.250 9.625 6750.0 PRODUCTION STRING 8.500 12425.0 REMARKS: MWD - GR/EWR4/CNP/SLD. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL MPF-53 PB1 IS REPRESENTED BY RUNS 1 AND 2. WELL MPF-53 KICKED-OFF FROM WELL MPF-53 PB1 AT 2000'. WELL MPF-53 IS REPRESENTED BY RUNS 3 AND 4. RUN 3 IS DIRECTIONAL ONLY AND NO DATA IS PRESENTED. RUN 4 IS DIRECTIONAL WITH GAMMA RAY (SGRC), ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4), COMPENSATED NEUTRON POROSITY (CNP/SPSF), AND STABILIZED LITHO-DENSITY (SLD/SBDC). GAMMA RAY DATA ACQUIRED WITH DUAL GAMMA RAY, GEIGER MUELLER TYPE DETECTORS, AND IS DENOTED AS DGR/SGRC. PER BP INSTRUCTION (DAVE DOUGLAS), RUN 1 IS INCLUDED FOR MPF-53 PB1 ONLY, DUE TO THE DATA GAP CAUSED BY RUN 3 BEING DIRECTIONAL ONLY. WELL MPF-53 DATA HAS BEEN DEPTH SHIFTED. WELL MPF-53 WAS DRILLED TO TD AT 12425'. ANNULAR AND CRITICAL VELOCITIES CALCULATED USING THE POWER LAW MODEL. ~±LE HEADER FILE NIIMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP NPHI RHOB $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA START DEPTH 6699.0 6699.0 6699.0 6754.0 UNKNOWN (MEASURED DEPTH) BASELINE DEPTH GR 10210.5 10211.5 10212.5 10213.5 10291.5 10287.0 10982.5 10985.5 11268.5 11270.5 11440.5 11447.0 11780.5 11781.5 11959.0 11960.0 11962.0 11961.5 12006.0 12006.0 12013.5 12012.0 '12027.5 12028.5 12054.5 12055.5 12055.0 12056.5 12056.0 12058.0 12059.0 12060.0 12093.0 12095.0 12116.5 12118.5 $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: BIT RUN NO 4 MERGED MAIN PASS. all bit runs merged. STOP DEPTH 12354.0 12327.0 12335.0 12343.0 EQUIVALENT UNSHIFTED DEPTH MERGE TOP 6775.0 MERGE BASE 12425.0 /? ?SHIFT. OUT $ CN : BP EXPLORATION WN : MPF-53 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME (ALASKA) depth ID: F 11 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 2 RPX MWD 68 1 3 RPS MWD 68 1 4 RPM MWD 68 1 5 RPD MWD 68 1 6 RHOB MWD 68 1 7 DRHO MWD 68 1 8 PEF MWD 68 1 9 NPHI MWD 68 1 10 FET MWD 68 1 11 RO P MWD 68 1 API API API API Log Crv Crv Size Length Typ Typ Cls Mod AAPI 4 OHMM 4 OHMM 4 OHMM 4 0HMM 4 G/c3 4 G/C3 4 BN/E 4 PU-S 4 HR 4 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 890 01 1 4 90 180 01 1 4 90 810 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 552 Tape File Start Depth = 12450.000000 Tape File End Depth = 6660.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 138973 datums Tape Subfile: 2 663 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~ape Subfile 3 is type: miS FILE HEADER FILE NI3MBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 6700.0 EWR4 6700.0 CNP 6700.0 SLD 6755.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG'INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12356.0 12329.0 12336.0 12345.0 14 -AUG- 95 ISC 2.02 3.94 MEMORY 12425.0 6775.0 12425.0 0 27 .'3 65.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD LITHO-DENSITY DGR DUAL GAMMA RAY $ TOOL NUMBER P0363CRNDG6 P0363CRNDG6 P0363CRNDG6 P0363CRNDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 6750.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MI/D AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND-LT 10.20 46.0 9.5 450 4.4 1.800 .560 1.800 2.800 85.0 157.0 85.0 85.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: SANDSTONE 2.65 HOLE CORRECTION ~( ~-~ : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 4. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-53 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units .0 0 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 - 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 RHOB MWD 68 1 G/C3 4 7 DRHO MWD 68 1 G/C3 4 8 PEF MWD 68 1 BN/E 4 9 NPHI MWD 68 1 PU-S 4 10 FET MWD 68 1 HR 4 11 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 552 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 890 01 1 4 90 180 01 1 4 90 810 01 1 44 Tape File Start Depth = 12450.000000 Tape File End Depth = 6660.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 138973 datums Tape Subfile: 3 621 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~'ape Subfile 4 is type: LIS 96/10/15 01 **** REEL TRAILER **** 96/10/16 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 16 OCT 96 12:19p Elapsed execution time = 3.90 seconds. SYSTEM RETURN CODE = 0 ~ubfile 2 is type' TAPE HEADER PRUDHOE BAY UNIT MW]D/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MPF-53 PB1 500292257870 MWD RUN 1 AK-MM- 950736 M. WORDEN J. ROBERTSON BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 16-0CT-96 MWD RUN 2 M. WORDEN J. ROBERTSON 6 13N 257 2Oate ~ OL/~~.L..._.~ 48.40 46.90 13.40 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 12.250 REMARKS: 20.000 110.0 6725.0 MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL MPF-53 PB1 IS REPRESENTED BY RUNS 1 AND 2. RUNS 1 AND 2 ARE DIRECTIONAL WITH GAMMA RAY (SGRC) AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). ALL GAMMA RAY DATA ACQUIRED WITH DUAL GAMMA RAY, GEIGER MUELLER TYPE DETECTORS, AND IS DENOTED AS DGR/SGRC. RECORDED DATA FOR MWD RUN 2 WAS NOT RECOVERED. THE TOOL WAS LOST IN THE HOLE AFTER BHA WAS ABANDONED. RESISTIVITY (SEMP ONLY) AND GAMMA RAY FOR MWD RUN 2 IS REALTIME PULSED DATA WHICH HAS GAPS. WELL MPF-53 PB1 DATA HAS NOT BEEN DEPTH SHIFTED. WELL MPF-53 PB1 WAS DRILLED TO TD AT 6725'. ANA/LU_JLR AND CRITICAL VELOCITIES CALCULATED USING THE POWER LAW MODEL. ~LE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 62.0 6677.0 110.0 6669.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 110.0 3668.0 2 3668.0 6725.0 MERGED MAIN PASS. CN WN FN COUN STAT BP EXPLORATION (ALAS~) MPF-53 PB1 MILNE POINT NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Recor 433 Tape File Start Depth = 6750.000000 Tape File End Depth = 50.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 107209 datums Tape Subfile: 2 522 records... Minimum record length: Maximum record length: 62 bytes 998 bytes ~pe Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SI/MMARY VENDOR TOOL CODE START DEPTH GR 62.0 EWR4 110.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 3620.0 3612.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ 31-JUL-95 ISC 2.02 3.94 MEMORY 3668.0 110.0 3668.0 0 .2 65.6 TOOL NUMBER P0362CRG8 P0362CRG8 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 12.250 110.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SPUD 8.70 47.0 9.0 1500 11.2 2.300 1.777 2.300 2.900 68.0 86.0 68.0 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: MOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT BP EXPLORATION (ALASKA) MPF-53 PB1 MILNE POINT NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 234 Tape File Start Depth = 3675.000000 TaPe File End Depth = 50.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 58009 datums Tape Subfile: 3 299 records... Minimum record length: Maximum record length: 62 bytes 998 bytes ~=pe Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 3620.0 EWR4 3613.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 6677.0 6669.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ 04-AUG-95 ISC 2.02 3.94 REAL-TIME 6725.0 3668.0 6725.0 0 63.6 66.3 TOOL NUMBER P0362CRG8 P0362CRG8 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 12.250 110.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MI/D CAKE AT MT: SPUD 8.70 47.0 9.0 1200 11.5 2.300 1.777 2.300 2.900 68.0 86.0 68.0 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-53 PB1 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPM MWD 68 1 OHMM 4 3 FET MWD 68 1 HR 4 4 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 180. 01 1 4 90 810 01 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 127 Tape File Start Depth = 6750.000000 Tape File End Depth = 3600.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 138715 datums Tape Subfile: 4 I92 records... Minimum record length: 26 bytes Maximum record length: 1006 bytes ~pe Subfile 5 is type: LIS 96/10/ 5 01 **** REEL TRAILER **** 96/10/15 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 15 OCT 96 3:58p Elapsed execution time = 3.02 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 2 is typ~ LIS TAPE HEADER MILNE POINT UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MPF - 53 500292257800 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 22-SEP-95 6478.00 K. RICHARDS J. FOX 6 13N 10E 2028 2572 48.40 46.90 13.40 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 20.000 113.0 91.10 3RD STRING 9.625 6750.0 40.00 PRODUCTION STRING 7.000 12398.0 26.00 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS GR GRCH 1 1 13-SEP-95 WESTERN ATLAS LOGGING SERVICES PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ GR/CCL Cased Hole. REMARKS: - EQUIVALENT UNSHIFTED DEPTH *** THIS IS THE DEPTH REFERENCE FOR THIS WELL *** PASS 1 WAS NOT DEPTH SHIFTED SINCE PASS 1 IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER ~ ' FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GRCH $ .5000 START DEPTH 10000.0 STOP DEPTH 12280.0 CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE PASS NUMBER: BASELINE DEPTH $ REMARKS: EQUIVALENT UNSHIFTED DEPTH PASS 1 (MAIN PASS). NO DEPTH SHIFTS WERE DONE SINCE THIS IS THE DEPTH REFERENCE. CN WN FN COUN STAT : BP EXPLORATION : MPF - 53 : MILNE POINT/KUPARUK : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 1 Curves: Name Tool Code Samples Units 1 GRCH GR 68 1 GAPI 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 30 995 99 1 * DATA RECORD (TYPE# 0) Total Data Records: 36 1022 BYTES * Tape File Start Depth = 10000.000000 Tape File End Depth = 12285.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER'**** LIS representation code decoding summary: Rep Code: 68 9143 datums Tape Subfile: 2 124 records... Minimum record length: 62 bytes Maximum record length: 1022 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 12035.0 12280.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH GRCH 12052.5 12052.5 12053.0 12053.0 12053.5 12054.0 12059.5 12060.0 12072.0 12072.0 12074.0 12074.0 12093.0 12093.5 12094.5 12095.0 12265.5 12267.5 12266.0 12268.0 $ REMARKS: EQUIVALENT UNSHIFTED DEPTH PASS 2 (REPEAT PASS). CN WN FN COUN STAT / ? ?MATCH2A. OUT $ : BP EXPLORATION : MPF - 53 : MILNE POINT/KUPARUK : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 1 Curves: Name Tool Code Samples Units GRCH GR 68 1 GAPI API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 30 995 99 1 * DATA RECORD (TYPE# 0) Total Data Records: 1022 BYTES * Tape File Start Depth = 12035.000000 Tape File End Depth = 12285.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1003 datums Tape Subfile: 3 45 records... Minimum record length: 62 bytes Maximum record length: 1022 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9990.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 12286.0 13-SEP-95 FSYS REV. J001 VER. 1.1 1334 13-SEP-95 12309.0 12290.0 10000.0 12288.0 1800.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EBAR SBAR EBAR CCL GR FDEN $ ECCENTRIC SINKER BAR SINKER BAR ECCENTRIC SINKER BAR PCM/COLLAR LOC. GAMMA RAY FLUID DENSITY TOOL NUMBER 8250EA/8248EA 8262XA 8223XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 12398.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): DIESEL/SEAWATER .00 .0 .0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE,COUNT RATE NORMALIZATION IN OIL ZO~,~ TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 0 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 0 TOOL STANDOFF (IN): .0 REMARKS: PASS 1 (MAIN PASS). $ CN WN FN COUN STAT : BP EXPLORATION : MPF - 53 : MILNE POINT/KUPARUK : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CCL GR 68 3 SPD GR 68 4 TEN GR 68 1 GAPI 4 1 4 1 F/MN 4 1 LB 4 4 30 310 01 1 4 30 150 01 1 4 30 636 99 1 4 30 635 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 184 Tape File Start Depth = 9990.000000 Tape File End Depth = 12286.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55069 datums Tape Subfile: 4 260 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12036.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 12285.0 13-SEP-95 FSYS REV. J001 VER. 1.1 1320 13-SEP-95 12309.0 12290.0 10000.0 12288.0 1800.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EBAR SBAR EBAR CCL GR FDEN $ ECCENTRIC SINKER BAR SINKER BAR ECCENTRIC SINKER BAR PCM/COLLAR LOC. GAMMA RAY FLUID DENSITY TOOL NUMBER 8250EA/8248EA 8262XA 8223XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .0OO 12398.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): DIESEL/SEAWATER .00 .0 .0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE 'COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS) : 0 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS) : 0 TOOL STANDOFF (IN): .0 REMARKS: PASS 2 (REPEAT PASS). $ CN WN FN COUN STAT : BP EXPLORATION : MPF - 53 : MILNE POINT/KUPARUK : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CCL GR 68 3 SPD GR 68 4 TEN GR 68 1 GAPI 4 1 4 1 F/MN 4 1 LB 4 4 30 310 01 1 4 30 150 01 1 4 30 636 99 1 4 30 635 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 20 Tape File Start Depth = 12036.000000 Tape File End Depth = 12285.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5989 datums Tape Subfile: 5 96 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 6 is type: LIS 95/ 9/22 01 **** REEL TRAILER **** 95/ 9/22 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 22 SEP 95 7:36a Elapsed execution time = 6.59 seconds. SYSTEM RETURN CODE = 0