Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout195-088Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
/~~~ File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
[] Color items - Pages:
Grayscale, halftones, pictures, graphs, charts-
Pages'
Poor Quality Original- Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
[] Logs of various kinds
[] Other
COMMENTS:
Scanned by: Beverly Dia~athan Lowell
Isl
[] TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~
~
{
~TO
A~RGY
XTO Energy Inc.
200 North Loraine
Suite 800
Midland, Texas 79701
432-682-8873
432-687-0862 (Fax)
July 22, 2005
RECEIVED
JUL 2 5 Z005
Alaska Oil and Gas Conservation Commission
Attn: Mr. John Norman
333 West 7th Ave., Suite 100
Anchorage, Alaska 99501
Alaska Oil & Gas Cons. Commission
Anchorage
RE: REVISED Well Completion Report: Well A34-11LS P&A
1!fJ.'dIIÀ"~"":··',
l ~~:;;'V7J U"
Dear Mr. Norman,
""
XTO Energy, Inc. hereby re-submits its REVISED Well Completion Report (Form 10-407) for the
work performed to plug and abandon well A34-11 LS on Platform A, in the Middle Ground Shoal Field
of Cook Inlet, AK back in Sept 2000. The original 10-407 Form filed on June 29, 2005 contained
several errors dating back to 1985 when the well was completed and again in June 2000 when the well v
was submitted for the P&A.
Please find attached the following information for your files:
1. Form 1 0-407 Well Completion
2. Daily Operations Report
3. Post P&A Wellbore Schematic
4. Deviation Survey
If you have any questions or require additional information, please contact me at (432) 620-6743.
Sincerely,
9cJ. J. Y
Paul L. Figel
Engineering Manager
Cc: Scott Griffith
Tim Smith
SCANNED AUG 0 2 l.ODS
1a. Well Status:
( STATE OF ALASKA ' RECEfVFO
ALAt .A OIL AND GAS CONSERVATION COM~, 510N J . --
WELL COMPLETION OR RECOMPLETION REPORT AND L~G 5 Z005
OilO GasU Plugged ~ Abandoned~ SuspendedO WAGU 1b. Well clcAl8lkø (Jff" Uta cø....~ CO~TUS$
20AAC25,105 20AAC25.110 Development 0 mhtf~
No. of Completions 1 Other Service 0 Stratigraphic Test 0
5. Date Comp., Susp., or 12. Permit to Drill Number:
Aband.: 9/22/00 95-88
6. Date Spudded: 13. API Number:
July 1, 1995 50-733-10084-02
7. Date TD Reached: 14. Well Name and Number:
July 31, 1995 A34-11 LS
8. KB Elevation (ft): 15. Field/Pool(s):
38' MGS/G Pool
9. Plug Back Depth(MD+ TVD):
7219' + 6756'
10. Total Depth (MD + TVD):
Zone- . 11,209' + 9824' "
Zone- GN 11. Depth Where SSSV Set:
Zone- HC NA
19. Water Depth, if Offshore:
73 feet MSL
16. Property Designation:
ADL-18756
17. Land Use Permit:
NA
20. Thickness of Permafrost:
NA
GINJO WINJO WDSPLD
2. Operator Name:
XTO Energy Inc.
3. Address:
200 North Loraine, Suite 800, Midland, Texas 79701
4a. Location of Well (Governmental Section): Platform A, Leg 1
Surface: Cond 4, 1624' FSL, 430' FEL, Sec 11, T8N, R13W, S.M.
Top of Productive Horizon:
@ 7587' 332' FSL, 1980' FEL, Sec 11, T8N, R13W, S.M.
Total Depth:
@ 11,209' 1218' FNL, 3081' FEL, Sec 14, T8N, R13W, S.M.
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 232790 ~ y- 2485843 /
TPI: x- 231211 y- 2484587
Total Depth: x- 230075 ~ y- 2483060 ..
18. Directional Survey: Yes 0 No D
21. Logs Run:
NA
22. CASING, LINER AND CEMENTING RECORD
WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT
CASING FT. GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED
13-3/8" 54.5 J55 Surf 1664' Surf 1661' 17-1/2" 1900 sxs 0
9-5/8" 43.5-47 N80 Surf 6747' Surf 6308' 12-1/4" 1100 sxs 0
7" 29 L80 6427' 8318' 6008' 7811' 8-1/2" 2200 sxs 0
5" 18 P110 8081' 9480' 7582' 8785' 6" 310 sxs 0
3-1/2" 9.2 N80 9402' 11,205' 8726' 9822' 4-1/8" Slotted Liner 0
23. Perforations open to Production (MD + TVD of Top and Bottom
Interval, Size and Number; if none, state "none"):
NA
24.
SIZE
NA
TUBING RECORD
DEPTH SET (MD) PACKER SET (MD)
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
8120' 150sxscmt
9320' 91 sxs cmt
26.
Date First Production:
NA
Date of Test: Hours Tested:
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.):
Flow Tubing
Press.
Casing Press:
Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio:
Test Period ....
Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity - API (corr):
24-Hour Rate -+
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
NA
0", r',' ('.." ~ ~ ~.\ L
",' I
A6::u"~'i1 ~1V!..11'¡'
II"''''~'_."'"'''."''''-' . "",., ".. ,
~ ¡~~~)Mf'U:T~m ,.
~ 1",,\,1"1"·
~.' --;:7 I....'. ,I:t
; ", I Z-2-. t:(;J
~ -JE:·\i:ir~f.;~t¡
;~ ~ - . .
~I!'II!~" ,¡¡'~'.~~~tI'lI'I"""",~l'\jN·~~",c.
(,f
RBDMS BFL AUG 0 1 2005
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE
NAME
GEOLOGIC MARKEl"
TVD
29. t FORMATION TESTS
Include and briefly s3.. .Iarize test results. List intervals tested, and attach
detailed supporting data as necessary. If no tests were conducted, state
"None".
28.
NA
30. List of Attachments:
Wellbore Schematic, Deviation Survey and Daily Operations Report
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Paul Figel
Printed Name: Paul Figel
Signature: j) a..L '#. ~
Title: Engineering Manager
Phone: 432-620-6743
Date: 7/22/2005
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is
changed.
Item 1a: Classification of Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for
Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool
completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on
this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show
the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately
produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other
( explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
XTO ENERGY, INC.
WELL: A34-11LS
DAILY DRILLING REPORTS
OBJECTIVE: P&A A34-11LS for Sidetrack A34-11LS2
9-13-00 MIR U derrick. Prepare decks.
9-16-00 RU Circ lines. Fill ann. Pmp tbg vol w/FIW. Monitor well before setting BPV & ND
tree.
9-17 -00 Set BPV & ND tree. MU landing jt & pull tree. NU BOP, flow line, trip tank line, chk
line, fab kill line, & install pollution pans. Pull BPV. Install 2-way check. RU tst assy.
Tst Hydril250 & 2500 psi and 250 & 5000 psi on stack & chk lines. Tst accum & gas
alarms.
9/18/00 Pu1l2-way chk. Attempt to pull tbg hanger. MU 2 DC's, jar & bumper sub. Jar hanger
free. Pu1l65k over to reI pkr. Pull hanger above rotary. Circ btms up plus tbg vol thru
gas buster. Monitor well. Hole taking 7 -8 BPH. Pull & LD 2-7/8" 6.5# 8rd EUE tbg,
checking for norm. BOP body tst 250/5000 psi & 3-Y2 rams 250/5000 psi. Well has
taken 177 bbls last 24 hrs.
09/19/00 Rill w/5" csg scraper. PU 3-Y2" DP. RIH to 9388'. Wash thru tight spots @ 8062'-
8075' & 8308' -8462'. Pmp 20 bbl Hi-Vis Sweep. Circ btms up. POOH w/5" csg
scraper. RIH w/5" Baker cmt retainer. Hole has taken a tot of 241 bbls of fluid.
9/20/00 Set cmt retainer @ 9320'. Unsting. Circ DP vol. RU BJ. Press tst lines to 6000 psi.
Sting into retainer. EIR of 3 bpm @ 3500 psi. Pmp 15 BFW pre-flush, followw/ 18.5
bbl (91 sx Class G cmt + 0.05% BWOC R-l + 0.3% BWOC CD-32 + 0.6 BWOC FL-
33 + 1 Gal/100 sx FP-6L + 43.7% FW. Displ w/57 BFW. Pull out of retainer. Lay 2
bbl on top of BP.
9/21/00 Rev circ btms up. POOH w/Baker 5" rtnr stinger. MlU 4-1/8" mill tooth bit to tag cmt.
Rill tag hard cmt @ 9242'. Held 15000 wt. Mix & pmp 25 bbl of 50 Vis 9.3 ppg
spacer (fill f/top of cmt to 7950' w/wt mud). POOH. LD Bit. MlU & RIH w/Baker 5"
cmt retainer to be set @ 8120'.
9/22/00 Set Baker 5" cmt retainer @ 8120'. Sting out. Circ DP vol. RlU BJ. Pmp 5 BFW. Mix
& pmp 31 bbl of Class G cmt mixed as: 150 sx Class G cmt + 0.05% BWOC R-1 +
0.3% BWOC CD-32 + 0.6% BWOC FL-33 + 1 Gal/100 sx FP-6L + 43.7% FW. Pump
9 bbl FW & displ w/36 bbl FW. POOH 10 stds. Rev circ DP vol. POOH. LD Baker
stinger. RIH w/ 6" junk bit to tag cmt. Tag cmt @ 7219'. Held 15000# wt. Pmp 85 bbl
of 47 vis 9.3 wt mud. POOH & LD 3-Y2" DP.
,/
(
~TO
~kRGY
MGS A34-11LS
Cook Inlet, Alaska
Leg 1, Conductor 4
API No.: 50-733-10084-02
Original Spud: Oct '65 (A23-12)
Sidetrack A34-11: 11-2-84
Sidetrack A34-11 LS: 7-1-95
Surf Csg: 13-3/8" 54.5# J55 BTC.
Set @ 1664'. Cmt'd wI 1900 sx.
Intermediate: 9-5/8" 43.5- 47# N80.
Set @ 6747'. Cmt'd wI 1100 sx.
Drilling Liner: 5" 18# P11 0 STL.
Set @ 9480'. TOL @ 8081'.
Cmt'd wI 310 sx.
Prod Liner: 3-%" 9.2# N80 BTC slotted.
Set @ 11,205'. TOL @ 9402'.
~:'
P&A'd 9-21-00 for Sidetrack A34-11 LS2
Current Status
PLF 6-28-05
KB: 38'
Water Depth: 73' MSL
GN-GO: 7587 - 7610'
GR-GS: 7962 - 8010'
5" Cmt Retainer @ 8120'. P&A'd wI 150 sk cmt.
TOC @ 7219' (9-21-00).
5" Cmt Retainer @ 9320'.
P&A 'd wI 91 sk cmt. (9-20-00).
Slotted Liner Reverse Penetration:
HR-HN-HK-H I-HF-HE-HD-HC.
TO: 11,209' MD (9824' TVD)
(
(
.- I
..... I
IA Platform, Well A34-11LS
TNTEQ Alaska State Plane
Coordinates
Measured Angle Azimuth TVD-RKB TVD X Y N I-S E/-W DLS Vert. Sec
SW# Depth deg deg ft Subsea ft ft ft ft deg/100 ft ft
Tie-In 0.00 0.00 0.00 0.00 -116.00 232790.27 2485842.85 ~ 0.00 0.00 0.00 0.00
1 100.00 0.13 290.00 100.00 -16.00 232790.16 2485842.89 0.04 -0.11 0.13 0.05
2 200.00 0.75 338.00 200.00 84.00 232789.83 2485843.54 0.68 -0.46 0.67 -0.13
3 300.00 1.93 323.00 299.97 183.97 232788.61 2485845.52 2.64 -1.72 1.22 -0.53
4 400.00 1.40 323.00 399.93 283.93 232786.92 2485847.88 4.96 -3.47 0.53 -0.82
5 500.00 4.32 271.00 499.80 383.80 232782.44 2485849.02 6.00 -7.97 3.63 1.78
6 600.00 6.62 85.00 599.63 483.63 232784.43 2485849.55 6.57 -5.99 10.93 -0.07
7 650.00 6.50 85.00 649.30 533.30 232790.13 2485849.92 7.07 -0.30 0.24 -4.58
8 700.00 6.55 86.00 698.98 582.98 232795.81 2485850.23 7.51 5.37 0.25 -9.04
9 800.00 6.05 84.00 798.37 682.37 232806.76 2485850.93 8.46 16.30 0.55 -17.71
10 900.00 5.52 80.00 897.86 781.86 232816.76 2485852.09 9.85 26.28 0.67 -25.98
11 1000.00 4.97 79.00 997.45 881.45 232825.79 2485853.55 11.51 35.27 0.56 -33.70
12 1100.00 4.72 78.00 1097.09 981.09 232834.10 2485855.04 13.19 43.54 0.26 -40.92
13 1200.00 2.15 74.00 1196.90 1080.90 232839.96 2485856.28 14.56 49.37 2.58 -46.13
14 1300.00 0.87 70.00 1296.86 1180.86 232842.49 2485857.00 15.34 51.89 1.28 -48.51
15 1400.00 0.85 77.00 1396.85 1280.85 232843.94 2485857.39 15.77 53.32 0.11 -49.85
16 1500.00 0.65 80.00 1496.84 1380.84 232845.22 2485857.63 16.03 54.61 0.20 -50.97
17 1600.00 0.60 67.00 1596.84 1480.84 232846.27 2485857.91 16.33 55.65 0.15 -51.94
18 1700.00 0.78 1.00 1696.83 1580.83 232846.79 2485858.78 17.22 56.14 0.77 -52.90
19 1800.00 0.85 338.00 1796.82 1680.82 232846.55 2485860.16 18.59 55.87 0.33 -53.64
20 1900.00 1.33 257.00 1896.81 1780.81 232845.15 2485860.62 19.01 54.46 1.46 -52.89
21 2000.00 4.43 231.00 1996.67 1880.67 232840.96 2485858.02 16.32 50.33 3.29 -48.03
22 2050.00 6.02 229.00 2046.46 1930.46 232837.41 2485855.16 13.39 46.85 3.20 -43.48
23 2100.00 7.43 228.00 2096.12 1980.12 232832.94 2485851.38 9.50 42.47 2.83 -37.63
24 2150.00 9.67 229.00 2145.56 2029.56 232827.26 2485846.59 4.58 36.90 4.49 -30.20
25 2200.00 11.38 229.00 2194.72 2078.72 232820.23 2485840.76 -1.41 30.01 3.42 -21.07
26 2250.00 12.97 230.00 2243.59 2127.59 232812.06 2485834.10 -8.25 21.98 3.21 -10.53
27 2300.00 13.68 231.00 2292.24 2176.24 232803.00 2485826.97 -15.58 13.09 1.49 0.97
28 2350.00 15.07 233.00 2340.68 2224.68 232793.04 2485819.57 -23.21 3.30 2.95 13.34
29 2400.00 16.62 234.00 2388.78 2272.78 232781.89 2485811.70 -31.33 -7.67 3.15 26.91
30 2450.00 17.93 235.00 2436.52 2320.52 232769.60 2485803.36 -39.94 -19.76 2.69 41.63
31 2500.00 19.47 235.00 2483.88 2367.88 232756.27 2485794.47 -49.14 -32.89 3.08 57.52
32 2550.00 21.12 235.00 2530.77 2414.77 232741.84 2485784.85 -59.09 -47.10 ' 3.30 74.70
33 2600.00 22.25 236.00 2577.23 2461.23 232726.38 2485774.74 -69.55 -62.33 2.38 92.98
34 2700.00 25.22 236.00 2668.77 2552.77 232692.51 2485753.00 -92.05 -95.69 2.97 132.76
35 2800.00 28.13 236.00 2758.11 2642.11 232654.73 2485728.75 -117.15 -132.91 2.91 177.12
36 2900.00 28.48 235.00 2846.16 2730.16 232615.06 2485702.79 -144.01 -171.98 0.59 224.04
37 3000.00 28.02 236.00 2934.25 2818.25 232575.46 2485676.87 -170.82 -210.99 0.66 270.88
38 3100.00 27.30 236.00 3022.82 2906.82 232536.39 2485651.79 -196.78 -249.47 0.72 316.76
39 3200.00 27.77 237.00 3111.49 2995.49 232497.27 2485627.17 -222.29 -288.02 0.66 362.38
40 3300.00 26.13 235.00 3200.63 3084.63 232459.13 2485602.71 -247.61 -325.60 1.87 407.16
41 3400.00 26.42 237.00 3290.30 3174.30 232421.88 2485578.80 -272.36 -362.30 0.93 450.91
42 3500.00 24.75 237.00 3380.49 3264.49 232385.14 2485556.11 -295.88 -398.51 1.67 493.46
43 3600.00 24.03 236.00 3471.57 3355.57 232350.19 2485534.11 -318.67 -432.95 0.83 534.22
44 3700.00 23.68 237.00 3563.02 3447.02 232315.97 2485512.57 -340.99 -466.67 0.53 574.13
45 3800.00 24.50 237.00 3654.31 3538.31 232281.24 2485491.12 -363.22 -500.90 0.82 614.35
46 3900.00 24.22 239.00 3745.41 3629.41 232245.78 2485470.06 -385.08 -535.88 0.87 654.87
47 4000.00 24.13 240.00 3836.64 3720.64 232210.03 2485450.09 -405.86 -571.16 0.42 694.89
48 4100.00 24.75 242.00 3927.68 3811.68 232173.40 2485430.87 -425.91 -607.35 1.03 735.06
49 4200.00 24.93 242.00 4018.43 3902.43 232135.87 2485411.99 -445.63 -644.44 0.18 775.68
50 4300.00 23.93 244.00 4109.48 3993.48 232098.62 2485394.05 -464.42 -681.28 1.30 815.48
51 4400.00 24.27 246.00 4200.76 4084.76 232061.23 2485377.65 -481.67 -718.28 0.88 854.36
52 4500.00 25.35 247.00 4291.53 4175.53 232022.38 2485361.80 -498.39 -756.76 1.16 893.97
53 4600.00 26.38 249.00 4381.52 4265.52 231981.57 2485346.40 -514.72 -797.21 1.35 934.74
54 4700.00 27.27 251.00 4470.76 4354.76 231938.83 2485331.95 -530.14 -839.61 1.27 976.34
55 4800.00 28.57 252.00 4559.11 4443.11 231894.1 0 2485318.12 -544.99 -884.02 1.38 1019.02
56 4900.00 30.05 253.00 4646.31 4530.31 231847.09 2485304.47 -559.70 -930.71 1.56 1063.29
(
(
Measured Angle Azimuth TVD-RKB TVD I X Y N I-S E/-W DLS I Vert. Sec
SW# Depth deg deg ft Subsea ft ft ft ft deg/100 ft ft
57 5000.00 31.05 254.00 4732.43 4616.43 231798.04 2485291.16 -574.13 -979.44 1.12 1108.86
58 5100.00 30.30 255.00 4818.44 4702.44 231748.58 2485278.64 -587.77 -1028.60 0.91 1154.21
59 5200.00 30.05 256.00 4904.89 4788.89 231699.65 2485267.16 -600.35 -1077.26 0.56 1198.47
60 5300.00 29.68 257.00 4991.61 4875.61 231650.98 2485256.64 -611.98 -1125.68 0.62 1241.91
61 5400.00 28.53 253.00 5078.99 4962.99 231603.74 2485245.16 -624.53 -1172.65 2.26 1284.91
62 5500.00 27.75 245.00 5167.20 5051.20 231559.42 2485229.34 -641.36 -1216.60 3.85 1328.61
63 5600.00 27.18 238.00 5255.95 5139.95 231518.45 2485208.32 -663.31 -1257.08 3.28 1373.23
64 5700.00 26.45 232.00 5345.21 5229.21 231480.95 2485183.34 -689.13 -1294.01 2.80 1417.87
65 5800.00 25.75 227.00 5435.03 5319.03 231446.87 2485155.58 -717.66 -1327.45 2.31 1461.79
66 5900.00 25.07 219.00 5525.38 5409.38 231416.94 2485124.97 -748.95 -1356.67 3.50 1504.49
67 6000.00 25.12 210.00 5615.97 5499.97 231392.19 2485090.66 -783.81 -1380.63 3.81 1545.75
68 6100.00 23.25 201.00 5707.22 5591.22 231373.67 2485054.25 -820.63 -1398.32 4.13 1583.74
69 6200.00 23.68 199.00 5798.95 5682.95 231359.21 2485017.16 -858.04 -1411.93 0.90 1619.14
70 6300.00 22.88 200.00 5890.81 5774.81 231345.18 2484980.21 -895.30 -1425.12 0.89 1654.12
71 6400.00 21.93 200.00 5983.26 5867.26 231331.33 2484944.70 -931.12 -1438.16 0.95 1688.01
72 6500.00 21.80 200.00 6076.07 5960.07 231317.80 2484910.00 -966.11 -1450.89 0.13 1721 . 13
73 6600.00 21.10 200.00 6169.14 6053.14 231304.52 2484875.94 -1000.48 -1463.40 0.70 1753.64
74 6700.00 20.17 200.00 6262.73 6146.73 231291.71 2484843.10 -1033.59 -1475.46 0.93 1784.98
75 6740.00 18.50 200.00 6300.47 6184.47 231286.90 2484830.76 -1046.04 -1479.98 4.18 1796.75
76 6800.00 19.25 198.00 6357.24 6241.24 231280.17 2484812.56 -1064.39 -1486.30 1.65 1813.85
77 6900.00 17.75 197.00 6452.07 6336.07 231269.94 2484782.53 -1094.65 -1495.85 1.53 1841.41
78 7000.00 17.50 194.00 6547.38 6431.38 231261.18 2484753.56 -1123.81 -1503.94 0.94 1867.15
79 7100.00 18.00 190.00 6642.62 6526.62 231254.18 2484723.90 -1153.62 -1510.26 1.32 1892.03
80 7200.00 17.75 194.00 6737.80 6621.80 231247.13 2484694.05 -1183.63 -1516.63 1.25 1917.09
81 7300.00 17.00 194.00 6833.23 6717.23 231239.25 2484665.24 -1212.60 -1523.86 0.75 1942.07
82 7400.00 17.00 201.00 6928.88 6812.88 231229.84 2484637.62 -1240.44 -1532.63 2.05 1967.41
83 7500.00 16.75 198.00 7024.57 6908.57 231219.53 2484610.49 -1267.79 -1542.33 0.91 1993.10
84 7600.00 17.00 198.00 7120.27 7004.27 231209.94 2484583.10 -1295.40 -1551.30 0.25 2018.43
85 7700.00 17.50 194.00 7215.77 7099.77 231201.14 2484554.80 -1323.89 -1559.45 1.29 2043.77
86 7800.00 16.75 190.00 7311.34 7195.34 231194.34 2484526.16 -1352.67 -1565.59 1.40 2067.82
87 7900.00 15.75 191.00 7407.34 7291.34 231188.63 2484498.77 -1380. 18 -1570.68 1.04 2090.24
88 8000.00 15.75 188.00 7503.59 7387.59 231183.54 2484472.12 -1406.95 -1575.16 0.81 2111.70
89 8100.00 15.50 185.00 7599.90 7483.90 231179.88 2484445.44 -1433.70 -1578.22 0.85 2132.11
90 8200.00 15.50 177.00 7696.27 7580.27 231178.81 2484418.80 -1460.36 -1578.68 2.14 2150.55
91 8300.00 15.50 167.00 7792.65 7676.65 231181.91 2484392.36 -1486.72 -1574.98 2.67 2165.74
Tie-In 8303.00 15.50 167.00 7795.54 7679.54 231182.01 2484391.57 -1487.52 -1574.86 2.59 2161.9
1 8358.00 13.30 166.40 7848.81 7732.81 231184.84 2484378.19 -1500.83 -1571.72 4.01 2169.5
2 8389.00 15.00 163.00 7878.87 7762.87 231186.69 2484370.84 -1508.13 -1569.71 6.1 2173.47
3 8420.00 16.90 161.58 7908.68 7792.68 231189.1 2484362.67 -1516.24 -1567.11 6.26 2177.63
4 8451.00 18.50 160.17 7938.21 7822.21 231191.99 2484353.70 -1525.14 -1564.02 5.34 2182.04
5 8483.00 21.00 158.73 7968.32 7852.32 231195.56 2484343.50 -1535.26 -1560.22 7.96 2186.85
6 8515.00 22.90 157.28 7998 7882.00 231199.79 2484332.31 -1546.35 -1555.73 6.17 2191.91
7 8579.00 27.70 155.40 8055.85 7939.85 231210.23 2484307.04 -1571.38 -1544.73 7.6 2202.71
8 8610.00 30.20 153.60 8082.97 7966.97 231216.39 2484293.36 -1584.91 -1538.26 8.54 2208.21
9 8641.00 31.30 151.80 8109.61 7993.61 231223.34 2484279.12 -1599 -1530.99 4.63 2213.55
10 8707.00 32.20 152.40 8165.74 8049.74 231238.88 2484248.06 -1629.69 -1514.74 1.45 2224.93
11 8736.00 32.60 150.30 8190.22 8074.22 231246.02 2484234.26 -1643.32 -1507.29 4.12 2229.83
12 8768.00 32.80 148.60 8217.15 8101.15 231254.47 2484219.18 -1658.21 -1498.5 2.94 2234.73
13 8800.00 32.50 152.10 8244.1 8128.10 231262.66 2484204.00 -1673.21 -1489.96 5.97 2239.88
14 8832.00 33.50 153.90 8270.94 8154.94 231270.21 2484188.29 -1688.74 -1482.05 4.38 2245.85
15 8864.00 34.70 154.20 8297.43 8181.43 231277.7 2484171.99 -1704.87 -1474.2 3.79 2252.3
16 8896.00 35.60 157.70 8323.6 8207.60 231284.81 2484155.00 -1721.69 -1466.7 6.9 2259.49
17 8927.00 36.50 162.20 8348.67 8232.67 231290.66 2484137.73 -1738.82 -1460.46 9.02 2267.77
18 8959.00 36.80 164.30 8374.34 8258.34 231295.75 2484119.32 -1757.11 -1454.96 4.03 2277.4
19 8991.00 37.10 167.50 8399.92 8283.92 231300.01 2484100.57 -1775.76 -1450.27 6.08 2287.85
20 9049.00 36.70 175.30 8446.33 8330.33 231304.43 2484066.09 -1810.13 -1445.06 8.1 2309.45
21 9080.00 36.70 178.40 8471.18 8355.18 231305.03 2484047.58 -1828.62 -1444.05 5.98 2322.28
22 9112.00 36.80 182.30 8496.83 8380.83 231304.47 2484028.45 -1847.76 -1444.16 7.3 2336.36
23 9144.00 37.40 189.30 8522.36 8406.36 231302.08 2484009.32 -1866.93 -1446.12 13.32 2351.73
24 9176.00 37.80 189.30 8547.71 8431.71 231298.49 2483990.13 -1886.2 -1449.28 1.25 2367.97
25 9208.00 38.40 191 .40 8572.9 8456.90 231294.5 2483970.80 -1905.62 -1452.83 4.46 2384.6
26 9239.00 38.20 194.30 8597.23 8481.23 231289.8 2483952.17 -1924.35 -1457.1 5.83 2401.22
27 9270.00 38.10 197.10 8621.61 8505.61 231284.21 2483933.87 -1942.78 -1462.28 5.59 2418.23
2
('
~f
I Measured Angle Azimuth I TVD-RKB TVD X Y N I-S E/-W DLS Vert. Sec
SVY# Depth deg deg ft Subsea ft ft ft ft deg/100 ft ft
28 9300.00 38.30 200.601 8645.19 8529.19 231277.82 2483916.46 -1960.33 -1468.27 7.24 2435.16
29 9333.00 38.10 203.40 8671.12 8555.12 231269.75 2483897.72 -1979.25 -1475.91 5.28 2454.21
30 9396.00 38.10 209.00 8720.71 8604.71 231251.81 2483863.27 -2014.1 -1493.06 5.48 2491.39
31 9428.00 39.70 216.80 8745.63 8629.63 231240.51 2483846.69 -2030.93 -1503.98 16.09 2511 . 15
32 9485.00 41.50 226.00 8788.95 8672.95 231215.38 2483819.53 -2058.65 -1528.49 10.96 2548.14
33 9532.00 42.70 224.90 8823.82 8707.82 231192.43 2483797.94 -2080.76 -1550.94 3 2579.62
34 9594.00 42.80 223.10 8869.35 8753.35 231162.52 2483768.35 -2111.03 -1580.17 1.98 2621.7
35 9656.00 46.30 228.70 8913.54 8797.54 231130.59 2483738.87 -2141.22 -1611 .42 8.48 2665.09
36 9682.00 47.50 231.50 8931.31 8815.31 231115.75 2483727.04 -2153.39 -1625.99 9.12 2683.92
37 9714.00 47.90 232.90 8952.85 8836.85 231096.72 2483712.96 -2167.9 -1644.69 3.47 2707.28
38 9777.00 51.40 233.60 8993.63 8877.63 231057.61 2483685.13 -2196.61 -1683.16 5.62 2754.52
39 9841.00 51.30 235.00 9033.6 8917.60 231016.37 2483656.89 -2225.78 -1723.75 1.72 2803.53
40 9904.00 53.70 236.40 9071.95 8955.95 230974.45 2483629.69 -2253.94 -1765.04 4.2 2852.27
41 9966.00 55.30 238.60 9107.96 8991.96 230931.28 2483603.55 -2281.04 -1807.6 3.87 2901.13
42 9998.00 54.80 235.70 9126.29 9010.29 230908.93 2483589.83 -2295.27 -1829.64 7.59 2926.55
43 10029.00 53.80 235.00 9144.38 9028.38 230887.9 2483576.00 -2309.58 -1850.35 3.71 2951.14
44 10092.00 56.30 235.70 9180.47 9064.47 230844.77 2483547.62 -2338.93 -1892.82 4.07 3001.57
45 10155.00 56.40 234.30 9215.38 9099.38 230801.14 2483518.52 -2369.01 -1935.78 1.86 3052.86
46 10180.00 55.10 232.90 9229.45 9113.45 230784.23 2483506.65 -2381.27 -1952.42 6.96 3073.17
47 10243.00 55.30 233.60 9265.41 9149.41 230742.09 2483476.65 -2412.22 -1993.87 0.97 3124.08
48 10308.00 53.70 234.30 9303.15 9187.15 230698.61 2483446.48 -2443.37 -2036.65 2.61 3176.02
49 10371.00 53.60 232.20 9340.5 9224.50 230657.28 2483417.06 -2473.72 -2077.3 2.69 3225.95
50 10433.00 54.20 235.00 9377.03 9261.03 230616.3 2483388.27 -2503.44 -2117.62 3.77 3275.17
51 10495.00 52.30 232.30 9414.13 9298.13 230575.63 2483359.76 -2532.87 -2157.63 4.64 3323.98
52 10558.00 52.30 234.30 9452.66 9336.66 230535 2483330.89 -2562.66 -2197.59 2.51 3373.02
53 10621.00 52.70 235.00 9491.01 9375.01 230493.58 2483302.91 -2591.57 -2238.36 1.09 3421.96
54 10681.00 52.90 235.00 9527.29 9411.29 230453.82 2483276.39 -2618.98 -2277.51 0.33 3468.71
55 10744.00 54.10 235.70 9564.76 9448.76 230411.52 2483248.56 -2647.78 -2319.17 2.1 3518.17
56 10806.00 54.90 235.70 9600.76 9484.76 230369.19 2483221.07 -2676.22 -2360.86 1.29 3567.41
57 10869.00 55.30 237.90 9636.81 9520.81 230325.32 2483193.78 -2704.51 -2404.1 2.93 3617.57
58 10900.00 55.10 239.90 9654.5 9538.50 230303.23 2483181.13 -2717.65 -2425.89 5.34 3642.05
59 10958.00 56.30 240.00 9687.19 9571.19 230261.23 2483158.08 -2741.65 -2467.36 2.07 3687.88
60 11021.00 57.10 240.70 9721.78 9605.78 230214.89 2483133.09 -2767.69 -2513.12 1.57 3738.13
61 11047.00 57.20 ' 240.70 9735.88 9619.88 230195.6 2483122.83 -2778.38 -2532.17 0.38 3758.94
62 11100.00 57.20 240.70 9764.59 9648.59 230156.26 2483101.92 -2800.19 -2571.02 0 3801.37
/ 63 11209.00 57.20 240.70 9823.64 9707.64 230075.37 2483058.91 -2845.02 -2650.92 0 3888.64
3
)
)
/95' - b8S
-------- Original Message --------
Subject: Re: Coordinates for A34-11 LS: Please Confirm
Date: Wed, 13 Jul2005 14:40:21 -0500
From: PauLFigel@xtoenergy.com
To: Stephen Davies <steve_davies@admin.state.ak.us>
CC: Bob Fleckenstein <bob_fleckenstein@admin.state.ak.us>
Steve & Bob,
Here is list a problems I see with this well. Take some Tylenol before diving in.
Attached are 2 deviation surveys from Inteq. The file named "xycoordinates" is the file I had Inteq
run to get me the exact points (highlighted in red) of interest wlo interpolating.
(See attached file: A34-11 LS Survey Data.xls)(See attached file: A34-11 LS xycoordinates.xls)
However, last night I discovered a mistake on the TPI. Ever since the A34-11 LS was drilled &
completed in 1985, the TPI was reported as 8303' (the top of the HD behind slotted liner was
reported @ 8,403'). Shell neglected to account for the GN-GO & GR-GS perfs @ 7587-8010' on
the 10-407 on 9-11-95.
(See attached file: A34-11 LS Completion 10_ 407.doc)
Another point of confusion is the fact that the location from the lease lines for TO were changed
from 2170' FNL to 1218' & 2220' FWL to 3081' FEL Sec 14 on the completion but the Sundry to
P&A the well on 6-29-00 shows TO @ 561' FNL & 2286' FEL Sec 14. I have not been able to talk
to my geologist in FTWyet but I would believe the 1281' FNL & 3081' FEL Sec 14 is correct
based off my map & measuring wI a ruler.
(See attached file: A34-11 LS Sundry to P&A.doc)
Please review & see if there is something I'm missing as to why the XV's are off by 397' & 910'.
Talking to Steve, the xy's are independent of lease lines. Once we agree on the error, I can
resubmit & change the TPI also on the 10-407 I sent in on 6-29-05.
Appreciate the help,
Paul
Paul Figel
Engineering Manager
XTO Energy Inc.
Midland, TX
Office: 432-620-6743
,'" --.," '. H\h,':r', Ilu Go 2 2005
C;\..hl~~\h'a¡¡"-' ; . '-
) )
MGS A34-11 LS 195-088
ASP Zone 4
Surface X Surface Y BHLX BHL Y
BakerHughes 232,790.27 2,485,842.85 230,075.37 2,483,058.91
GeoFrame 232,790.73 2,485,847.81 230,075.78 2,483,064.01
Difference (0.46) (4.96) (0.41 ) (5.10)
BakerHughes MWD 232,790.27 2,485,842.83 230,075.26 2,483,059.01
GeoFrame 232,790.73 2,485,847.81 230,075.78 2,483,064.01
Difference (0.46) (4.98) (0.52) (5.00)
RBDMS Reported 232,790.00 2,485,843.00 230,078.00 2,483,061.00
RBDMS Calculated 232,786.49 2,485,841.70 230,069.26 2,483,061.58
Difference w Reported 3.51 1.30 8.74 (0.58)
Difference w GeoFrame 4.24 6.11 6.52 2.43
Difference w Baker Hughes MWD 3.78 1.13 6.00 (2.57)
Difference w Baker Hughes 3.78 1.15 6.11 (2.67)
Meets & Bounds
Surface X Surface Y
1 0-407 430 FEL 1,624 FSL Sec. 11
GeoFrame 742 FEL 1,626 FSL
Difference (312) (2)
BHLX BHL Y
1 0-407 3,081 FEL 1,218 FNL Sec. 14
GeoFrame 3,387 FEL 1,221 FNL
Difference (306) (3)
GeoFrame = measured directly off computer screen using GeoFrame's Planimeter tool
AOGCC
Davies
7/20/2005
)
)
S. ..:..u.....·.. þ.'..... :..J.. e."..c.··.·· t:.··. R.....··.. e...··..:.·..·..·.....C..·..·......9. .0.·..·... r..·.. ct: 1.·.·...11.· ... a.t...·.·~..s. .....£..0.. ..f.. ...··.A.··......:...3.·. ..4.·....-..·...1...· ..·.·.1. ~$:Pl~a.s~þ()p~nn
~~()IU:~aµlTF~f71.~~to7~er~·çr~···.. .... . . .. .:....
~·~¢:\M~d(13[ul 0$14:40:21;:0500
Steve & Bob,
Here is list a problems I see with this well. Take some Tylenol before
diving in.
Attached are 2 deviation surveys from Inteq. The file named "xy
coordinates" is the file I had Inteq run to get me the exact points
(highlighted in red) of interest w/o interpolating.
(See attached file: A34-11LS Survey Data.xls) (See attached file: A34-11LS
xy coordinates. xIs)
However, last night I discovered a mistake on the TPI. Ever since the
A34-11LS was drilled & completed in 1985, the TPI was reported as 8303'
(the top of the HD behind slotted liner was reported @ 8,403'). Shell
neglected to account for the GN-GO & GR-GS perfs @ 7587-8010' on the 10-407
on 9-11-95.
(See attached file: A34-11LS Completion 10_407.doc)
Another point of confusion is the fact that the location from the lease
lines for TD were changed from 2170' FNL to 1218' & 2220' FWL to 3081' FEL
See 14 on the completion but the Sundry to P&A the well on 6-29-00 shows TD
@ 561' FNL & 2286' FEL Sec 14. I have not been able to talk to my geologist
in FTW yet but I would believe the 1281' FNL & 3081' FEL Sec 14 is correct
based off my map & measuring w/ a ruler.
(See attached file: A34-11LS Sundry to P&A.doc)
Please review & see if there is something I'm missing as to why the XY's
are off by 397' & 910'. Talking to Steve, the xy's are independent of lease
lines. Once we agree on the error, I can resubmit & change the TPI also on
the 10-407 I sent in on 6-29-05.
Appreciate the help,
Paul
Paul Figel
Engineering Manager
XTO Energy Inc.
Midland, TX
Office: 432-620-6743
Mobil: 432-553-5217
Fax: 432-687-0862
Stephen Davies
<steve davies@adm
in.state.ak.us>
To
Paul Figel@xtoenergy.com
07/11/2005 01:11
PM
cc
Bob Fleckenstein
<bob fleckenstein@admin.state.ak.us
>
) )
Subject
Coordinates for A34-11LS: Please
Confirm
(See attached file: C.htm)
Paul,
Bob Fleckenstein, who handles the well completion data for AOGCC, noticed that there are discrepancies in the
coordinates for A34-11LS.
1. The Total Depth information given on the well completion form (form 10-407) submitted by XTO on June
29,2005 does not match the original well information. When the footages from section lines are put into
AOGCC's database and used to calculate Alaska State Plane Zone 4 coordinates, AOGCC's calculated X and
Y state plane coordinates do not match the coordinates provided by XTO on the well completion form.
2. The State Plane coordinates for the top of the productive interval provided by XTO do not match AOGCC's
calculated coordinates derived from the footages from section lines provided on the well completion report.
The X coordinate is 397 feet off and the Y is 910 feet off.
Could you please check on these discrepancies with your survey company and provide AOGCC with the best
coordinates available?
Thanks,
Steve Davies
Petroleum Geologist
Alaska Oil and Gas Conservation Commission
Telephone: (907) 793-1224
Survey
Content-Type: application/msexcel
Content-Encoding: base64
Content-Type: application/msexcel
Content-Encoding: base64
Content-Type: application/msword
A34-11LS Completion 10_ 407.doc
Content-Encoding: base64
Content-Type: application/msword
A34-11LS Sundry to P&A.doc
Content-Encoding: base64
)
")
Content-Type: text/html
Content-Encoding: base64
)
')
:...
.....
'IBIOHIS-
----ÎNT;E~
----.--.---.--.-
A Platform, Well A34-11 LS
Alaska State Plane
Coordinates
Measured Angle Azimuth TVD-RKB TVD X Y N 1 -S E 1 -W DLS Vert. Sec
SVY# Depth deg deg__ ft Subsea ft ft ft ft deg/100 ft ft
Tie-In 0.00 0.00 0.00 0.00 -116.00 232790.27 2485842.85 0.00 0.00 - 0.00 0.00
1 100.00 0.13 290.00 100.00 -16.00 232790.16 2485842.89 0.04 -0.11 0.13 0.05
2 200.00 0.75 338.00 200.00 84.00 232789.83 2485843.54 0.68 -0.46 0.67 -0.13
3 300.00 1.93 323.00 299.97 183.97 232788.61 2485845.52 2.64 -1.72 1.22 -0.53
4 400.00 1.40 323.00 399.93 283.93 232786.92 2485847.88 4.96 -3.47 0.53 -0.82
5 500.00 4.32 271.00 499.80 383.80 232782.44 2485849.02 6.00 -7.97 3.63 1.78
6 600.00 6.62 85.00 599.63 483.63 232784.43 2485849.55 6.57 -5.99 10.93 -0.07
7 650.00 6.50 85.00 649.30 533.30 232790.13 2485849.92 7.07 -0.30 0.24 -4.58
8 700.00 6.55 86.00 698.98 582.98 232795.81 2485850.23 7.51 5.37 0.25 -9.04
9 800.00 6.05 84.00 798.37 682.37 232806.76 2485850.93 8.46 16.30 0.55 -17.71
10 900.00 5.52 80.00 897.86 781.86 232816.76 2485852.09 9.85 26.28 0.67 -25.98
11 1000.00 4.97 79.00 997.45 881.45 232825.79 2485853.55 11.51 35.27 0.56 -33.70
12 1100.00 4.72 78.00 1097.09 981.09 232834.10 2485855.04 13.19 43.54 0.26 -40.92
13 1200.00 2.15 74.00 1196.90 1080.90 232839.96 2485856.28 14.56 49.37 2.58 -46.13
14 1300.00 0.87 70.00 1296.86 1180.86 232842.49 2485857.00 15.34 51.89 1.28 -48.51
15 1400.00 0.85 77.00 1396.85 1280.85 232843.94 2485857.39 15.77 53.32 0.11 -49.85
16 1500.00 0.65 80.00 1496.84 1380.84 232845.22 2485857.63 16.03 54.61 0.20 -50.97
17 1600.00 0.60 67.00 1596.84 1480.84 232846.27 2485857.91 16.33 55.65 0.15 -51.94
18 1700.00 0.78 1.00 1696.83 1580.83 232846.79 2485858.78 17.22 56.14 0.77 -52.90
19 1800.00 0.85 338.00 1796.82 1680.82 232846.55 2485860.16 18.59 55.87 0.33 -53.64
20 1900.00 1.33 257.00 1896.81 1780.81 232845.15 2485860.62 19.01 54.46 1.46 -52.89
21 2000.00 4.43 231.00 1996.67 1880.67 232840.96 2485858.02 16.32 50.33 3.29 -48.03
22 2050.00 6.02 229.00 2046.46 1930.46 232837.41 2485855.16 13.39 46.85 3.20 -43.48
23 2100.00 7.43 228.00 2096.12 1980.12 232832.94 2485851.38 9.50 42.47 2.83 -37.63
24 2150.00 9.67 229.00 2145.56 2029.56 232827.26 2485846.59 4.58 36.90 4.49 -30.20
25 2200.00 11.38 229.00 2194.72 2078.72 232820.23 2485840.76 -1.41 30.01 3.42 -21.07
26 2250.00 12.97 230.00 2243.59 2127.59 232812.06 2485834.10 -8.25 21.98 3.21 -10.53
27 2300.00 13.68 231.00 2292.24 2176.24 232803.00 2485826.97 -15.58 13.09 1.49 0.97
~-- 2350.00 15.07 233.00 2340.68 2224.68 232793.04 2485819.57 -23.21 3.30 2.95 13.34
29 2400.00 16.62 234.00 2388.78 2272.78 232781.89 2485811.70 -31.33 -7.67 3.15 26.91
30 2450.00 17.93 235.00 2436.52 2320.52 232769.60 2485803.36 -39.94 '·----'-=-1"'9:76 2.69 41.63
-- _._,---,-
31 2500.00 19.47 235.00 2483.88 2367.88 232756.27 2485794.47 -49.14 -32.89 3.08 57.52
32 2550.00 -2T:12'-"--235~ÕO 2530.77 2414.77 232741.84 2485784.85 -59.09 -47.10 3.30 74.70
33 2600.00 22.25----236.00 2577.23 2461.23 232726.38 2485774.74 -69.55 -62.33 2.38 92.98
-" 34---' 2700.00 25.22 236.00 2668.77 2552.77 232692.51 2485753.00 -92.05 -95.69 2.97 132.76
35 2800.00 28.13 236.00 2758.11 2642.11 232654.73 2485728.75 -117.15 -132.91 2.91 177.12
36 2900.00 28.48 235.00 2846.16 2730.16 232615.06 2485702.79 -144.01 -171.98 0.59 224.04
-37--- 3000.00 28.02 236.00 2934.25 2818.25 232575.46 2485676.87 -170.82 -210.99 0.66 270.88
38 3100.00 27.30 236.00 3022.82 2906.82 232536.39 2485651.79 -196.78 -249.47 0.72 316.76
39 3200.00 27.77 237.00 3111.49 2995.49 232497.27 2485627.17 -222.29 -288.02 0.66 362.38
40 3300.00 26.13 235.00 3200.63 3084.63 232459.13 2485602.71 -247.61 -325.60 1.87 407.16
41 3400.00 26.42 237.00 3290.30 3174.30 232421.88 2485578.80 -272.36 -362.30 0.93 450.91
42 3500.00 24.75 237.00 3380.49 3264.49 232385.14 2485556.11 -295.88 -398.51 l' .67' 493.46
43 3600.00 24.03 236.00 3471.57 3355.57 232350.19 2485534.11 -318.67 -432.95 0.83 534.22
44 3700.00 23.68 237.00 3563.02 3447.02 232315.97 2485512.57 -340.99 -466.67 0.53 574.13
45 3800.00 24.50 --"-237.00 3654~3T' 3538.31 232281.24 2485491.12 -363.22 -500.90 '0.82 ··----·-614.35
46 3900.00 24.22 239.00 3745.41 3629.41 232245.78 2485470.06 -385.08 -535.88 -0]7 654.87
47 4000.00 24.13 240.00 3836.64 3720.64 232210.03 2485450.09 -405.86 -571.16 0.42 694.89
48 4100.00 24.75 242.00 3927.68 3811.68 232173.40 2485430.87 -425.91 -607.35 1.03 735.06
---.-
49 4200.00 24.93 242.00 4018.43 3902.43 232135.87 2485411.99 -445.63 -644.44 0.18 775.68
50 4300.00 23.93 244.00 4109.48 3993.48 232098.62 2485394.05 -464.42 -681.28 1.301 815.48
51 4400.00 24.27 246.00 4200.76 4084.76 232061.23 2485377.65 -481.67 -718.28 0.88 854.36
--"52"14500.00 25.35 247.00 4291.53 4175.53 232022.38 2485361.801 -498.391 -756.76 1.1611 893.97
53 4600.0026.38 _ 249.00i 4381.52 4265.52 231981.57 2485346.401 -514.72 [ -797.21\-- 1.35 934.74
~~}~·~~L3?oõ.00 I--'~~~,~?~f..=__ i5Iº-ºr="447.º-2§,!_.1~54.76 231938.83 248533~:_~L_. -530.14 -839.61 __.nu.! .27 ____.... 976.34
___?~.L__4800.00 I 28.57._.....?_5"?':ºQ+.__~559:_~..!. 4443.11 ,"?-ª-'!.~94. !Q"_~-ª?31ª:.!~ [_....:544.991 ..~-ª84.021_ __".~"___.,~gJ 9.0~"
--~~.-:-" ~~~~:~~ f----- .~~~_..,' ';;}'~%¡"--1-~~i1r'-~~~~:¡~ ;;~ ~:~~~-, ;:~~ï~f:*¡--~~~~~~--~~~~~¡¡--'-'-' - -+:;~ ---·--f~~~:~~
)
)
Measure<L___~':1_g~___, Azimuth TVD-RKB rvD X y N /-S E/-W DLS Vert.Sec
SW¡¡.- Depth deg de9._ ft Subsea ft ft ft ft deg/100 ft ft
58" 5100.00 30.30 255.00 4818.44 4702.44 231748.58 2485278.64 -587.77 -1028.60 0.91 1154.21
59 5200.00 30.05 256.00 4904.89 4788.89 231699.65 2485267.16 -600.35 -1077.26 0.56 1198.47
60 5300.00 29.68 257.00 4991.61 4875.61 231650.98 2485256.64 -611.98 -1125.68 0.62 1241.91
61 5400.00 28.53 253.00 5078.99 4962.99 231603.74 2485245.16 -624.53 -1172.65 2.26 1284.91
62 5500.00 27.75 245.00 5167.20 5051.20 231559.42 2485229.34 -641.36 -1216.60 3.85 1328.61
-63 5600.00 27.18 238.00 5255.95 5139.95 231518.45 2485208.32 -663.31 -1257.08 3.28 1373.23
64 5700.00 26.45 232.00 5345.21 5229.21 231480.95 2485183.34 -689.13 -1294.01 2.80 1417.87
65 5800.00 25.75 227.00 5435.03 5319.03 231446.87 2485155.58 -717.66 -1327.45 2.31 1461.79
66 5900.00 25.07 219.00 5525.38 5409.38 231416.94 2485124.97 -748.95 -1356.67 3.50 1504.49
67 6000.00 25.12 210.00 5615.97 5499.97 231392.19 2485090.66 -783.81 -1380.63 3.81 1545.75
68 6100.00 23.25 201.00 5707.22 5591.22 231373.67 2485054.25 -820.63 -1398.32 4.13 1583.74
69 6200.00 23.68 199.00 5798.95 5682.95 231359.21 2485017.16 -858.04 -1411.93 0.90 1619.14
70 6300.00 22.88 200.00 5890.81 5774.81 231345.18 2484980.21 -895.30 -1425.12 0.89 1654.12
71 6400.00 21.93 200.00 5983.26 5867.26 231331.33 2484944.70 -931.12 -1438.16 0.95 1688.01
72 6500.00 21.80 200.00 6076.07 5960.07 231317.80 2484910.00 -966.11 -1450.89 0.13 1721.13
73 6600.00 21.10 200.00 6169.14 6053.14 231304.52 2484875.94 -1000.48 -1463.40 0.70 1753.64
74 6700.00 20.17 200.00 6262.73 6146.73 231291.71 2484843.10 -1033.59 -1475.46 0.93 1784.98
75 6740.00 18.50 200.00 6300.47 6184.47 231286.90 2484830.76 -1046.04 -1479.98 4.18 1796.75
76 6800.00 19.25 198.00 6357.24 6241.24 231280.17 2484812.56 -1064.39 -1486.30 1.65 1813.85
77 6900.00 17.75 197.00 6452.07 6336.07 231269.94 2484782.53 -1094.65 -1495.85 1.53 1841.41
78 7000.00 17.50 194.00 6547.38 6431.38 231261.18 2484753.56 -1123.81 -1503.94 0.94 1867.15
79 7100.00 18.00 190.00 6642.62 6526.62 231254.18 2484723.90 -1153.62 -1510.26 1.32 1892.03
80 7200.00 17.75 194.00 6737.80 6621.80 231247.13 2484694.05 -1183.63 -1516.63 1.25 1917.09
81 7300.00 17.00 194.00 6833.23 6717.23 231239.25 2484665.24 -1212.60 -1523.86 0.75 1942.07
82 7400.00 17.00 201.00 6928.88 6812.88 231229.84 2484637.62 -1240.44 -1532.63 2.05 1967.41
83 7500.00 16.75 198.00 7024.57 6908.57 231219.53 2484610.49 -1267.79 -1542.33 0.91 1993.10
84 7600.00 17.00 198.00 7120.27 7004.27 231209.94 2484583.10 -1295.40 -1551.30 0.25 2018.43
85 7700.00 17.50 194.00 7215.77 7099.77 231201.14 2484554.80 -1323.89 -1559.45 1.29 2043.77
86 7800.00 16.75 190.00 7311.34 7195.34 231194.34 2484526.16 -1352.67 -1565.59 1.40 2067.82
87 7900.00 15.75 191.00 7407.34 7291.34 231188.63 2484498.77 -1380.18 -1570.68 1.04 2090.24
88 8000.00 15.75 188.00 7503.59 7387.59 231183.54 2484472.12 -1406.95 -1575.16 0.81 2111.70
89 8100.00 15.50 185.00 7599.90 7483.90 231179.88 2484445.44 -1433.70 -1578.22 0.85 2132.11
90 8200.00 15.50 177.00 7696.27 7580.27 231178.81 2484418.80 -1460.36 -1578.68 2.14 2150.55
91 8300.00 15.50 167.00 7792.65 7676.65 231181.91 2484392.36 -1486.72 -1574.98 2.67 2165.74
Tie-In 8303.00 15.50 167.00 7795.54 7679.54 231182.01 2484391.57 -1487.52 -1574.86 2.59 2161.9
1 8358.00 13.30 166.40 7848.81 7732.81 231184.84 2484378.19 -1500.83 -1571.72 4.01 2169.5
2 8389.00 15.00 163.00 7878.87 7762.87 231186.69 2484370.84 -1508.13 -1569.71 6.1 2173.47
3 8420.00 16.90 161.58 7908.68 7792.68 231189.1 2484362.67 -1516.24 -1567.11 -626-"-' 2177.63
4 8451.00 18.50 160.17 793821- 7822.21 231191.99 2484353.70 -1525.14 -1564.02 5.34 2182.04
5 8483.00 21.00 158.73 7968.32 7852.32 231195.56 2484343.50 -1535.26 -1560.22 7.96 2186.85
6 8515.00 22.90 157.28 7998 7882.00 231199.79 2484332.31 -1546.35 -1555.73 6.17 2191.91
7 8579.00 27.70 155.40 8055.85 7939.85 231210.23 2484307.04 -1571.38 -1544.73 7.6 2202.71
8 8610.00 30.20 153.60 8082.97 7966.97 231216.39 2484293.36 -1584.91 -1538.26 8.54 2208.21
9 8641.00 31.30 151.80 8109.61 7993.61 231223.34 2484279.12 -1599 -1530.99 4.63 2213.55
10 8707.00 32.20 152.40 8165.74 8049.74 231238.88 2484248.06 -1629.69 -1514.74 1.45 2224.93
11 8736.00 32.60 150.30 8190.22 8074.22 231246.02 2484234.26 -1643.32 -1507.29 4.12 2229.83
12 8768.00 32.80 148.60 8217.15 8101.15 231254.47 2484219.18 -1658.21 -1498.5 2.94 2234.73
13 8800.00 --'---'32.50 152.10 8244.1 8128.10 231262.66 2484204.00 -1673.21 -1489.96 5.97 2239.88
14 8832.00 33.50 153.90 8270.94 8154.94 231270.21 2484188.29 -1688.74 -1482.05 4.38 2245.85
15 8864.00 34.70 154.20 8297.43 8181.43 231277.7 2484171.99 -1704.87 -1474.2 3.79 2252.3
16 8896.00 35.60 157.70 8323.6 8207.60 231284.81 2484155.00 -1721.69 -1466.7 6.9 2259.49
17 8927.00 36.50 162.20 8348.67 8232.67 231290.66 2484137.73 -1738.82 -1460.46 9.02 2267.77
18 8959.00 36.80 164.30 8374.34 8258.34 231295.75 2484119.32 -1757.11 -1454.96 4.03 2277 .4
19 8991.00 37.10 167.50 8399.92 8283.92 231300.01 2484100.57 -1775.76 -1450.27 6.08 2287.85
20 9049.00 36.70 175.30 8446.33 8330.33 231304.43 2484066.09 -1810.13 -1445.06 8.1 2309.45
21 9080.00 36.70 178.40 8471.18 8355.18 231305.03 2484047.58 -1828.62 -1444.05 5.98 2322.28
22 9112.00 36.80 182.30 8496.83 8380.83 231304.47 2484028.45 -1847.76 -1444.16 7.3 2336.36
23 9144.00 37.40 189.30 8522.36 8406.36 231302.08 2484009.32 -1866.93 -1446.12 13.32 2351.73
24 9176.001 37.80 189.30 8547.71 8431.71 231298.49 2483990.13 -1886.2 -1449.28 1.25 2367.97
25 J 9208.001... 38.40. ,,191.40 .,8572.91 8456.90 231294.5 2483970.80 -1905.62 -1452.83 4.461 2384.6
-2"6'¡923i3.00f "---38201'--'-1943õì--ss-97:231 8481.23 231289.8 2483952.17 -1924.35 -1457.1 5.83 2401.22"
27T927ö".o6;----38.10 197.10¡--8621:611 8505.61 231284.21 2483933.87 ,-1942.78i -1462.28r-- 5.591 2418'.23
-28-193Ö6~ÖÒ('-- ---3S:"3Õ'-- 200.601 8645-:-19" .8529.191231277.8212483916.46'--~196Ö-:-331-:~f468~271-"- 7~-'- 2435.16
~ I 9333:ÕOr--- '38~101 203.40¡--a6"7T12---- 8555.121231269.75 2483897.721 -1979.2"51-::1475.911 ---5.281 -- 2454.21
2
)
')
Measured Angle Azimuth TVD-RKB TVD X y N /-S E/-W DLS Vert.Sec
SVY# Depth de9_.=_ de~;L ft Subsea'----'-fi--- ft ft ft de9!190 ft ft
30 9396.00 38.10 209.00 8720.71 8604.71 231251.81 2483863.27 -2014.1 -1493.06 5.48 2491.39
31 9428.00 39.70 216.80 8745.63 8629.63 231240.51 2483846.69 -2030.93 -1503.98 16.09 2511.15
32 9485.00 41.50 226.00 8788.95 8672.95 231215.38 2483819.53 -2058.65 -1528.49 10.96 2548.14
33 9532.00 42.70 224.90 8823.82 8707.82 231192.43 2483797.94 -2080.76 -1550.94 3 2579.62
34 9594.00 42.80 223.10 8869.35 8753.35 231162.52 2483768.35 -2111.03 -1580.17 1.98 2621.7
35 9656.00 46.30 228.70 8913.54 8797.54 231130.59 2483738.87 -2141.22 -1611.42 8.48 2665.09
36 9682.00 47.50 231.50 8931.31 8815.31 231115.75 2483727.04 -2153.39 -1625.99 9.12 2683.92
37 9714.00 47.90 232.90 8952.85 8836.85 231096.72 2483712.96 -2167.9 -1644.69 3.47 2707.28
38 9777.00 51.40 233.60 8993.63 8877.63 231057.61 2483685.13 -2196.61 -1683.16 5.62 2754.52
39 9841.00 51.30 235.00 9033.6 8917.60 231016.37 2483656.89 -2225.78 -1723.75 1.72 2803.53
40 9904.00 53.70 236.40 9071.95 8955.95 230974.45 2483629.69 -2253.94 -1765.04 4.2 2852.27
41 9966.00 55.30 238.60 9107.96 8991.96 230931.28 2483603.55 -2281.04 -1807.6 3.87 2901.13
42 9998.00 54.80 235.70 9126.29 9010.29 230908.93 2483589.83 -2295.27 -1829.64 7.59 2926.55
43 10029.00 53.80 235.00 9144.38 9028.38 230887.9 2483576.00 -2309.58 -1850.35 3.71 2951.14
44 10092.00 56.30 235.70 9180.47 9064.47 230844.77 2483547.62 -2338.93 -1892.82 4.07 3001.57
45 10155.00 56.40 234.30 9215.38 9099.38 230801.14 2483518.52 -2369.01 -1935.78 1.86 3052.86
46 10180.00 55.10 232.90 9229.45 9113.45 230784.23 2483506.65 -2381.27 -1952.42 6.96 3073.17
47 10243.00 55.30 233.60 9265.41 9149.41 230742.09 2483476.65 -2412.22 -1993.87 0.97 3124.08
48 10308.00 53.70 234.30 9303.15 9187.15 230698.61 2483446.48 -2443.37 -2036.65 2.61 3176.02
49 10371.00 53.60 232.20 9340.5 9224.50 230657.28 2483417.06 -2473.72 -2077.3 2.69 3225.95
50 10433.00 54.20 235.00 9377.03 9261.03 230616.3 2483388.27 -2503.44 -2117.62 3.77 3275.17
51 10495.00 52.30 232.30 9414.13 9298.13 230575.63 2483359.76 -2532.87 -2157.63 4.64 3323.98
52 10558.00 52.30 234.30 9452.66 9336.66 230535 2483330.89 -2562.66 -2197.59 2.51 3373.02
53 10621.00 52.70 235.00 9491.01 9375.01 230493.58 2483302.91 -2591.57 -2238.36 1.09 3421.96
54 10681.00 52.90 235.00 9527.29 9411.29 230453.82 2483276.39 -2618.98 -2277.51 0.33 3468.71
55 10744.00 54.10 235.70 9564.76 9448.76 230411.52 2483248.56 -2647.78 -2319.17 2.1 3518.17
56 10806.00 54.90 235.70 9600.76 9484.76 230369.19 2483221.07 -2676.22 -2360.86 1.29 3567.41
57 10869.00 55.30 237.90 9636.81 9520.81 230325.32 2483193.78 -2704.51 -2404.1 2.93 3617.57
58 10900.00 55.10 239.90 9654.5 9538.50 230303.23 2483181.13 -2717.65 -2425.89 5.34 3642.05
59 10958.00 56.30 240.00 9687.19 9571.19 230261.23 2483158.08 -2741.65 -2467.36 2.07 3687.88
60 11021.00 57.10 240.70 9721.78 9605.78 230214.89 2483133.09 -2767.69 -2513.12 1.57 3738.13
61 11047.00 57.20 240.70 9735.88 9619.88 230195.6 2483122.83 -2778.38 -2532.17 0.38 3758.94
62 11100.00 57.20 240.70 9764.59 9648.59 230156.26 2483101.92 -2800.19 -2571.02 0 3801.37
63 11209.00 57.20 240.70 9823.64 9707.64 230075.37 2483058.91 -2845.02 -2650.92 0 3888.64
3
)
)
XTO Energy, Inc.,slot #1M04
Platform A,
Middle Ground Shoal,Cook Inlet, Alaska
SURVEY LISTING Page 1 I
Wellbore: A34-11 LS I
___ Wellpath: MWD <8303-11209>
Date Printed: 28-Jun-2005
Wellbore I
--------
--------
Name
Created
Last Revised
-----------------------------------------------
A34-11 LS
19-0ct-2004 19-0ct-2004
Well
----
Name Government ID Last Revised
-----------------------------------------------
A34-11
19-0ct-2004
Slot
Name Grid Northing Grid Easting Latitude Longitude North East
------------------------------------------------------------------------------------------------------1
slot #1-042485842.8320 232790.2697 N60 47 44.8225 W151 2945.0416 6905.00N 430.00W
I
1 nstallation
------------
------------
Name
Easting Northing
Nort~
I
233063.082478929.98 N60 46 36.8260 W151 2936.3770 AK-4 on NORTH AMERICAN DATUM 1 True
Latitude
Longitude
Co-ord System Name
Alignment 1
----..-----------------------------..---------------------------------------------------...------------------------
Platform A
-..------,-...-.
.?<TO Energy, Inc.,slot #1-04 SURVEY LISTING Page 3
Platform A,.~_...Wellbore: A34-11 LS 1_
~~I~_Gro.~i§hoal,Coo~I~ïet~ Alasï<i~-.~,:"'__,_____ Wellpath: M\JY..I?__<8303-11209>
Date Printed: 28-Jun-2005
.'-.-.-.-----
-.--,.-.-------
---------..-----..---.--.--------.---.--
.-.-.------..-----,--- --.....-...----.--
~ïpattiJRep-o_~-=-I-
----.---,..--
--.-..----.--
---------.--,.---
-----..---.,.--
-----------.----
-----------------
-----------------
----.------...-.
-.---..--
MD Inc
Dir
rvD
North
Local Local Grid Grid
-.------
East Easting Northing
Latitude
Longitude
-- ---'"-..--.--..-.--
--------------------------------------------------------------------------------------------------------------------
8200 15.5 177 7696.27 -1460.36 -1578.68 231178.75 2484418.86 N60 47 30.4407 W151 30 16.8475
-,--- -1574.86 231181.95 2484391.62 N60 30.1733 W151 30 16.7705
8303 15.5 167 7795.54 -1487.52 47
8358 13.3 166.4 7848.81 -1500.83 -1571.72 231184.79 2484378.24 N60 47 30.0422 W151 30 16.7072
8389 15 163 7878.87 -1508.13 -1569.71 231186.63 2484370.9 N60 47 29.9703 W151 30 16.6666
8420 16.9 161.58 7908.68 -1516.24 -1567.12 231189.04 2484362.73 N60 47 29.8904 W151 30 16.6143
8451 18.5 160.17 7938.21 -1525.14 -1564.02 231191.93 2484353.76 N60 47 29.8027 W151 30 16.552
8483 21 158.73 7968.32 -1535.27 -1560.22 231195.5 2484343.55 N60 47 29.7031 W151 30 16.4753
8515 22.9 157.28 7998 -1546.35 -1555.73 231199.73 2484332.36 N60 47 29.5939 W151 30 16.3849
8579 27.7 155.4 8055.85 -1571.38 -1544.73 231210.17 2484307.1 N60 47 29.3475 W151 30 16.1631
8610 30.2 153.6 8082.97 -1584.92 -1538.26 231216.33 2484293.41 N60 47 29.2142 W151 30 16.0328
8641 31.3 151.8 8109.61 -1599 -1530.99 231223.28 2484279.17 N60 47 29.0755 W151 30 15.8862
8707 32.2 152.4 8165.741-1629.69 -1514.74 231238.82 2484248.12 N60 47 28.7733 W151 30 15.5588
8736 32.6 150.3 8190.22 -1643.32 -1507.29 231245.96 2484234.32 N60 47 28.639 W151 i 301 15.4086
87681 32.8 148.6 8217.151 -1658.211 -1498.51 231254.41 2484219.23 N60 147128.4925 W151 130115.2316
-'-·-----'---1----·------- 824-4.11 -1673.211 -1489.96 231262.6i 2484204.051N60 47 28.3448 w1511-30! 15.0595
8800 I 32.5 152.1
--.-----
8832
8864
8896
8927
8959
8991
9049
9080
9112
9144
9176
9208
9239
9270
9300
33.5
--------.
34.7
35.6
-.-------
36.5
36.8
37.1
36.7
36.7
36.8
37.4
37.8
38.4
38.2
38.1
38.3
153.9
154.2
157.7
162.2
164.3
167.5
175.3
178.4
182.3
189.3
189.3
191.4
194.3
197.1
200.6
)
8270.93
8297.43
8323.6
8348.67
8374.34
8399.92
8446.33
8471.18
8496.83
8522.36
8547.71
8572.9
8597.23
8621.61
8645.18
-1688.74 -1482.05
-1704.87 -1474.2
-1721.69 -1466.7
-1738.82 -1460.46
-1757.11 -1454.96
-1775.76 -1450.27
-1810.13 -1445.07
-1828.62 -1444.05
-1847.76 -1444.17
-1866.93 -1446.12
-1886.2 -1449.28
-1905.62 -1452.83
-1924.35 -1457.1
-1942.78 -1462.28
-1960.33 -1468.27
231270.15
231277.63
231284.74
231290.6
231295.68
231299.94
231304.36
231304.96
231304.4
231302.01
231298.42
231294.43
231289.73
231284.13
231277.74
)
2484188.34 N60 47 28.1919 W151 30
2484172.04 N60 47 28.033 W151 30
2484155.05 N60 47 27.8674 W151 30
2484137.78 N60 47 27.6987 W151 30
2484119.37 N60 47 27.5186 W151 30
2484100.62 N60 47 27.335 W151 30
2484066.14 N60 47 26.9965 W151 30
2484047.63 N60 47 26.8144 W151 30
2484028.5 N60 47 26.626 W151 30
2484009.37 N60 47 26.4371 W151 30
2483990.18 N60 47 26.2474 W151 30
2483970.85 N60 47 26.0561 W151 30
2483952.22 N60 47 25.8717 W151 30
2483933.92 N60 47 25.6902 W151 '30
2483916.51 N60 47 25.5174 W151 30
All data is in Feet unless otherwise stated
Coordinates are from Slot and TVD's are from Rig ( Actual Datum 116.0ft above mean sea level)
Reference MD's are from Rig, Offset MD's are from Rig I I
Vertical Section is from O.OON O.OOE on azimuth 222.98 degrees
Bottom hole distance is 3888.64 Feet on azimuth 222.98 degrees from Wellhead
Calculation method uses Minimum Curvature method
Confidence Limit of 95.45 (1 D)
Prepared by Baker Hughes Incorporated
I I I I I I I
XTO Energy, Inc.,slot #1-04 SURVEY LISTING Page 4
Platform A, Wellbore: A34-11 LS I
Middle Ground Shoal,Cook Inlet, Alaska Wellpath: MWD <8303-11209>
I I I Date Píinted: 28-J¡un-2005 I I
MD Inc Dir TVD Local Local Grid Grid Latitude Longitude
North East Easting Northing
-------------------------------------------------------------------------------------------------------------------...
9333 38.1 203.4
___'_.__n__.____
9396 38.1 209
_._____._40____ _
9428 39.7 216.8
9481 41.35 225.38
9485 41.5 226
-_._~,_._--"._-- --..--..--.--....".- --,-
9532 42.7 224.9
-------. ------,---
9594 42.8 223.1
.--...-.,--.-.-- -'--"---
9656 46.3 228.7
9682 47.5 231.5
9714 47.9 232.9
9777 51.4 233.6
9841 51.3 235
9904 53.7 236.4
9966 55.3 238.6
9998 54.8 235.7
10029 53.8 235
10092 56.3 235.7
------,-
10155 56.4 234.3
----,.._---
10180 55.1 232.9
10243 55.3 233.6
10308 53.7 234.3
10371 53.6 232.2
10433 54.2 235
10495 52.3 232.3
10558 i ----52-~31 234.3 I
--t ~~~+-~~:~~~HF==--- ;;; I
8671.12 -1979.25 -1475.91
8720.71 -2014.1 -1493.06
8745.63 -2030.93 -1503.97
8785.95 -2056.8 -1526.6
8788.95 -2058.65 -1528.49
8823.82 -2080.76 -1550.94
8869.35 -2111.03 -1580.17
------
8913.54 -2141.22 -1611.42
8931.31 -2153.39 -1625.99
8952.85 -2167.9 -1644.69
8993.63 -2196.61 -1683.16
9033.6 -2225.78 -1723.74
9071.95 -2253.93 -1765.04
9107.96 -2281.04 -1807.61
9126.29 -2295.27 -1829.64
9144.38 -2309.58 -1850.35
9180.47 -2338.93 -1892.83
9215.38 -2369.01 -1935.78
9229.45 -2381.27 -1952.42
9265.41 -2412.22 -1993.87
9303.15 -2443.37 -2036.65
9340.5 -2473.72 -2077.3
9377.03 -2503.44 -2117.62
9414.13 -2532.87 -2157.63
9452.66 -2562.66 -2197.59
9491.01 -2591.57! -2238.36
9527.291 -2618.991-=2277.51
231269.67 2483897.77 N60
231251.73 2483863.32 N60
231240.44 2483846.74 N60
231217.23
231215.3
231192.35
231162.43
231130.5
231115.67
231096.64
231057.53
231016.29
230974.37
230931.19
230908.84
230887.81
230844.68
230801.05
230784.14
230741.99
230698.52
230657.18
230616.2
230575.53
230534.9
230493.49
230453.72
2483821.39 N60
2483819.59 N60
2483798 N60
2483768.4 N60
2483738.93 N60
2483727.09 N60
2483713.02 N60
2483685.19 N60
2483656.96 N60
2483629.75 N60
2483603.62 N60
2483589.9 N60
2483576.07 N60
2483547.69 N60
2483518.6 N60
2483506.72 N60
2483476.72 N60
2483446.56 N60
2483417.14 N60
2483388.35 N60
2483359.84 N60
2483330.97 N60
2483302.99 N60
2483276.48 N60
14.9001
14.7419
14.5908
14.465
14.3541
14.2597
14.1546
14.1341
14.1364
14.1758
14.2393
14.3107
14.3967
14.5011
14.6218
47 25.3311 W151 30 14.7757
47 24.9879 W151 30 15.121
47 24.8221 W151 30 15.3409
47 24.5673 W151 30 15.7965
47 24.5491 W151 30 15.8347
47 24.3314 W151 30 16.2869
47 24.0332 W151 30 16.8758
47 23.7359 W151 30 17.5053
47 23.616 W151 30 17.7986
47 23.4731 W151 30 18.1753
47 23.1903 W151 30 18.9502
47 22.903 W151 30 19.7678
47 22.6257 W151 30 20.5996
47 22.3587 W151 30 21.4571
47 22.2186 W151 30 21.9009
47 22.0777 W151 30 22.3181
47 21.7885W151 30 23.1737
47 21.4923 W151 30 24.039
47 21.3715 W151 30 24.3741
47 21.0666 W151 30 25.209
47 20.7599 W151 30 26.0707
47 20.4609 W151 30 26.8896
47 20.1682 W151 30 27.7017
47 19.8783 W151 30 28.5076
47 19.5849 W151 30 29.3125
47 19.3001 W151 30130.1337
471 19.0301 W151 130 30.9222
10744
10806
10869
10900
10958
)
)
54.1 235.7
---~-----,_._._--_.._------ ,--
54.9 235.7
55.3 237.9
55.1 239.9
56.3 240
9564.76
9600.76
9636.81
9654.5
9687.19
-2647.78
-2676.22
-2704.51
-2717.66
-2741.65
-2319.17
-2360.86
-2404.1
-2425.89
-2467.36
230411 .42
230369.08
230325.22
230303.13
230261.12
2483248.65 N60 47
2483221.16 N60 47
2483193.87 N60 47
2483181.22 N60 47
2483158.18 N60 47
18.7465 W151 30
18.4663 W151 30
18.1877 W151 30
18.0581 W151 30
17.8218 W151 30
31.7614
32.6013
33.4721
33.9111
34.7464
All data is in Feet unless otherwise stated
Coordinates are from Slot and TVD's are from Rig (Actual Datum 116.0ft above mean sea level)
-Reference MD's are from Rig, Offset MD's are from Rig I I
Vertical Section is from O.OON O.OOE on azimuth 222.98 degrees
Bottom hole distance is 3888.64 Feet on azimuth 222.98 degrees from Wellhead
Calculation method uses Minimum Curvature method
Confidence Limit of 95.45 (1 D)
Prepared by Baker Hughes Incorporated
I I I I I I I
XTO Energy, Inc.,slot #1-04 SURVEY LISTING Page 5
Platform A, Wellbore: A34-11 LS I
Middle Ground Shoal,Cook Inlet, Alaska Wellpath: MWD <8303-11209>
I I I Date Píinted: 28-J,Un-2005 I I
MD Inc Dir TVD Local Local Grid Grid Latitude Longitude
North East Easting Northing
--------------------------------------------------------------------------------------------------------------------
11 021
11047
111 00
11205
11209
57.1
57.2
57.2
57.2
57.2
240.7
240.7
240.7
240.7
240.7
9721.78 -2767.69 -2513.13 230214.78 2483133.18 N60 47 17.5652 W151 30 35.6682
9735.88 -2778.38 -2532.17 230195.49 2483122.93 N60 47 17.4599 W151 30 36.0518
9764.59 -2800.19 -2571.02 230156.16 2483102.02 N60 47 17.2451 W151 30 36.8344
9821.47 -2843.38 -2647.99 230078.23 2483060.59 N60 47 16.8196 W151 30 38.3847
9823.64 -2845.02 -2650.92 230075.26 2483059.01 N60 47 16.8034 W151 30 38.4438
--,._-_.__.._------_._--~-..-._--_._._.._-,------_._--_._--- -....----.-
-----_.,------
---...'''.-,-.---------,-----.,----.
-'--'---"--"--'----
---.---.......--...----.---.-------.-.-
..-----------------,---,------..-...-
-------.,--.---..----- .._-----,---,--
--.-----..-----
--.....---,-----------.-.,-,--.--,-,-----..-.-
__,_·______~_,_._··._··..~._.~__~._..._._·__..·...__~...m,~"._.._._.._..,,___.___._.__
------_._.._--~-
_·__,_________·______.__.._..___._.RR________~_
-------,_._- _...._~_..._....~._._._..._-
-.,-----"..-..----
~-_.__.~--_._._----'"--------.. _....._-~- ---,-",._---_. ..._._._-----_..~-------
----,._-
-~~-_.__.._._._._.__._---
_._.~_... ------ --_._-----
-----_.._--_._._.._._-~._----~-~.._--, -'-
----~._._-_._---------
-'"_._._-~--_._._...- -"--..-.,.-
_.__.._---~-_.-
----..--.<---
---""_.._----
-,-------
.-----..-.----.-
----.,---- -t-- - I
---1·--·----- +-.-
._..__ All data is in Feet unless otherwise stated ,
Coordinates are from Slot and TVD's are from Rig ( Actual Datum 116.0ft above mean sea level)
=-~'=-____~=-==---=~Reference MD's are from Rig, Offset MD's are from Rig______._._ I I
Vertical Section is from O.OON O.OOE on azimuth 222.98 degrees I
---.--.---
-~--------'-
)
1)
Bottom hole distance is 3888.64 Feet on azimuth 222.98 degrees from Wellhead
Calculation method uses Minimum Curvature method
Confidence Limit of 95.45 (1 D)
Prepared by Baker Hughes Incorporated
I I I I I
SURVEY LISTING Page 6
Wellbore: A34-11 LS I
Wellpath: MWD <8303-11209>
Date Printed: 28-Jun-2005
I I
XTO Energy, Inc.,slot ~1-04
Platform A,
Mi~dle Ground Shoal,Cook Inlet, Alaska
I
Comments
-----------------
-----------------
MD
TVD
North East Remark
-----------------------------------------------------------------------------------------------------------
Hole Sections
-----------------
-----------------
Diameter
MD
Start Start
TVD
Sta rt
North
Start
East
End
MD
End
TVD
End
North
End
East
Wellbore
--------------------------------...--------------------------------------------------------------------------
Casings
-----------------
-----------------
Name
Top Top
MD TVD
Top
North
Top
East
Shoe Shoe
MD TVD
Shoe Shoe
North East
Wellbore
---..-------------------..-..----..----------------------------------------------------------------------------
Targets
-----------------
-----------------
Name
North
East TVD Latitude Longitude Easting Northing Last
Revised
--_._---_.-
----..-..----------------------------------------------------------------------------------------------------
==='=~·=~l-==:~~~=~-l====~~~,~~~~=~_~:~~~~~~~-==~~__,__________.__
~!Y_~y_I~_~l.f>..~~f::~~111
---_.~.__._---
--.-...-.-..--
~-,-,._,._._-----_.__.,-_._--
-,--.-----.
-----~-_.__..__._-----_.._.__._..-
- --.--.-,.-.-.---..-....---.--
------"---_.
--.-------...-,.----.....--------
-----------------
-----------------
----.----.-.-
--.-.--.--
Reference ___Survey Né!.r:!~_~_____,______.___~D
Survey Tool Error Model
TVD
_._._..._,~._..._.__._- --~_._---_._---~_.
-------------------------------------------------------...-...-----------------------------------...-------------
-------.--- .----. '-' -.-.----.-----
PGMS<0-1 0330> _____"'._~~_ºO.OO_ 7696.27 LeveU3E!~~_º.¥.~_ Standard
MWD <8303-11209> 11209.00 9823.64 MTC (collar) Stand~__
707685
707831
._----.-.._._-------_.__._._-_._._.~
--.---.------
_.-----,-
----~.__._.- ,..------------ .--------
-----
All data is in Feet unless otherwise stated
Coordinates are from Slot and TVD's are from Rig ( Actual Datum 116.0ft above mean sea level)
Reference MD's are from Rig, Offset MD's are from Rig I I
_.____ Vertical Section is from O.OON O.OOE on azimuth 222.98 degrees
Bottom hole distance is 3888.64 Feet on azimuth 222.98 degrees from Wellhead
Calculation method uses Minimum Curvature method
Confidence Limit of 95.45 (1 D)
Prepared by Baker Hughes Incorporated
-.--.---
I
I I
-.-.--....---.------
------.-.--------.
.)
)
-------- Original Message --------
Subject: Coordinates for A34-11 LS: Please Confirm
Date: Mon, 11 Jul 2005 10: 11 :39 -0800
From: Stephen Davies <steve_davies@admin.state.ak.us>
Organization: State of Alaska
To: PauLFigel@xtoenergy.com
CC: Bob Fleckenstein <bob_fIeckenstein@admin.state.ak.us>
Paul,
Bob Fleckenstein, who handles the well completion data for AOGCC, noticed that there are
discrepancies in the coordinates for A34-11 LS.
1. The Total Depth information given on the well completion form (form 10-407) submitted by
XTO on June 29,2005 does not match the original well information. When the footages from
section lines are put into AOGCC's database and used to calculate Alaska State Plane Zone 4
coordinates, AOGCC's calculated X and Y state plane coordinates do not match the coordinates
provided by XTO on the well completion form.
2. The State Plane coordinates for the top of the productive interval provided by XTO do not
match AOGCC's calculated coordinates derived from the footages from section lines provided on
the well completion report. The X coordinate is 397 feet off and the Y is 910 feet off.
Could you please check on these discrepancies with your survey company and provide AOGCC
with the best coordinates available?
Thanks,
Steve Davies
Petroleum Geologist
Alaska Oil and Gas Conservation Commission
Telephone: (907) 793-1224
-------- Original Message --------
Subject: 10-407 for A34-11 LS
Date: Mon, 11 Jul 2005 09:38:47 -0800
From: Robert Fleckenstein <bob_fIeckenstein@admin.state.ak.us>
Organization: State of Alaska
To: Stephen F Davies <steve_davies@admin.state.ak.us>
The Total Depth information given on the 10-407 does not match the original 1 0-407 information
given and when input into the database and run against CoreCon the calculated X and Y state
plane coordinates do not match the coordinates given on the 10-407.
The TPI state plane coordinates given do not match the calculated coordinates derived from the
TPI meads and bounds on the 10-407. The X coordinate is 397 feet off and the Y is 910 feet off.
BobF
)
)
STATE OF ALASKA .~'"
Á.ME)JbED ALASK}. ~lANDGAS CONSERVAT10N CO~:.J 3SION
W~LL_COMPLETION O~ RI;ÇOMPLET.ON REPOR"f."'~D ~OG
,. $r.arUll:lt We41 ' . CI.a"hcatlO~ CI~.J.f?' A-v I
I 'ri..Jt- ^ ....^'óI " . I \t ! .9/11
· ou. fX c;"'s 0 $USPE:NOEtI ~ . ABANDONED 0 ~eRVI_C!E ~-r~'T' - u c.;¡'IO:
,2. N~ ci"O~n04' l.~"1"· Permit NUl'nMr
SHELL .WESTERN, E&P. INC. ~~:!= 95..88
3. Ãddt-es.s -..... .A.~~, ; 8. API Nûmbolf - .
P.., .O~ BOX 576 (WCK 5237}.,. HOUSTON.. TX _.7~OOl-0Å 76r.~p;rTi~~··). 50- 733-~0084-02
... t.aca1lOr. ol_1L a111.1rtacl ,. . ¡::...2!.;'if:. 1; 9. UnLt Dr La_ III.,..
16241 FSL & 430' FEL 511, T8N, R13W, S.M. ':~~6~-:M I DDLE GROUND S~OAL
, A.t 'rap PrgclM:iRl<! InlnYlll : ,. 'f-;:J' ~ 10. W.I~ t.I,m~
, @ 8303 I MD-K~:. 137 ~ F!=iL & 19831 FEL 511, TaN, Rl. ,:··-S~}i:.A.:!\~4~~1~~, -
.1.1 TCI.~ ~Ih J1r:1.~'__ .sPJ2L F'êt... 11, Ftld In<! Pool
@ 11,209 I MD-KB; ~ FNL ~ .....EWI::-S14. TaN, R13W t S~M.:
5. eJ~~.o" '1'11.." (IndaUI KB. OF .lIkj' 16. L-.tl. C...ft.niol'l""" s.ri.a' 11I'0_ '. 'MíìS II GU POOL
1161 KB AJ)l. 18r5~, . ._'. ' '
~-12. On. ~\oI~ed \::1.. Dm T ,c. R-=.h., - I ~... o..~. Comø, .. Swø. 0" Aba...Q. - J 15, WlIur Oef:l~I'1, . it uUO\ftGr. 116. "'0.0' Comø....O""
7-02~ 9_5 7-30-95'H 8-05~9.5,. SO tNI MSL _ S1l'H~t f
· '17. TOt.1 COICI1:1\ u.Ão-+ TVD~ 11.91,,; Bac" Dcoln I,1O.o.TVCj 19. Otrec:,&.Gnal Sun..., I 20. Oeinl\ ,..IWI... SS$V "'«1 '2\. Th'Cl;neø elf ".n"I'\.etlOlt
,,~1!209IM~;~B:Z~'~D, ,_, .,----- YES~' NoD 3221_ _I"IM~_, , NA.
i 22. T'rCl. il.-çuc ar Chl\er l.Qo9'I Auon .. -" c " ' , ., ,-
~ ,D~TE/LDT-~/$GTL/TCCB/AM~!PEHAt IRTJ/GR. CET
23... CA.SING. LINER ANO CEMENTING RECORD _ ~
, I Ii SeTTING DEPTH Mò" - -
CJI.$ING SL2E WT. PI;R FT. GRADE ho.p f BOTTOM ~ ~OLe SIZE CEME~T'Na AeCORD
I f:j~~Jb"i 5~. 5# I ..1-!:>5 I '0 1650'- '~- , , 1900 SX -
. 9-5/8"[43.5..47* N-80 I Q.. }. 6747 t 17.-1/4" 1idÖ 5X
7 I~ _ ?9.# ! J -~O f 64?,-_,' 0.. 3251 8..11 ~" 2200 ,SOX
~ . , 1~~ ,!- 1'-"0 L RDA" q4Rll' 6" 310 SX
3-1/2H( 9~ 2# I N-80 I.. 9.q.Ol '1l~.,205 I 4-1/8" ~[O"r'E.[j LNH I
~.". S"trlOl:a~'ClN ~n 1;0 Prøa"'clio~ (Mo.TVC of ".QQ ancl aO~~QIrrI .nCl ¡ 25. ,T~S ING R!=CORD ,
inlat\4'. foizund n~~1 "SIZ:E 1 DEÞT'H .sE-T 0,'10') , ï PACÍ<ËP. SET (MC)
'¿ -} 18 iT' 747 9 I I 7 412 ~
i j _ -
i. 215._ Á¿m. FRACTUFI. E. CEMENT' SCU~i£:Z!:. ETC~ _' .. ,
t)EPT¡.( III.ITeRvÃ.L ih'lo' I ....IIfIÓUNT .& KIND Of M....URI...1. useo
f ,. --- W à - f ,- -
f :
rAMCOt.lT-PUL.I..ED
-, f- '
t
I
I
N/A - SLOTTED LNR
FROM 511 lNR SHOE TG TD
. -- - - -
I 21. _ PRODUCTION TEST
I o.~. ~'rrt 1;'05=95 1 ~ or GAS~ ~~I~ftg.'øu I'k.-~-~.¡
l' ,o.m8'~' ,101,6' "-_' ~9'5 f H~ ~ eft4-'IQ' ï PROOUC'TION FOFq Q t L-6 BL I G~C~' J w-";' ,.s:...a 6 L
· Co tTC;ST P!:RtOO'" t 1.49. \ 9? J 1 L '
i 1=10.0. ï..c'~ !:","9~" !:.AL'C....0.-rE'C :..IO¡L..fJSI.. (;AS-MCI= I ~ATER~aL
1 P'rt::D.. 95 620 ! :2'~O\Jf\ R.c:. TE .,... , !
~ 2£. C~~E DJ.';'"J.
! 6(., ~tJoq 01 htnO&OiY. poI'"'CIUty, ~es. ~''''1U GI~."G grneonœ ot oi~. QaS or....tt r. S~'1 core Cl'ltOS.
t .
l
,L
I C1-10JC:5 512;' I G.:.s-oIL RATao
I 1~8._ I _ 617
I C I L.. Ci RA V¡TY """,PI !fC"TI
I 34 . 7 ~
--I
I
I
¡: Olm 1 C>4oC7
RotY. 7·'-S'O
S.,II:wnct tn Clycloe.att
CQNTlPiUS::OON REVERSE SlD€
Lg
Cross Timbers Operating company
3. Address
210 Park Avenuc, stc, 2350, Oklahoma City, at< 731DZ
AMENDED
1. Type of ReqU!iit;
2. Na.me of Operabu
')
)
"-"r .
STATE OF ALASKA í
ALASKA OJL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
ø
cør
-,
[Xl Ab;lll1CQn Eo F'" G Pool
[ ] After Casing
[ ] Chng~ Ap:)roved Progf'llm
( ) Time Extension [ 1 Petforate
( ) Variance [ ) other
[ ) stiml.llate .
6. Datum Elevätlon (DF or KB)
[ ] Suspend [ 1 Plugg Ing
[ ] Repair We/I I J Pull TuÞlng
[ ]OperatioI'lShutoov.n I ] Re- EnterSulpendeclWell
._, 5. Type of well:
[Xl Development
[ ] Exploratory
[ ] StratlgraphlQ
[ 1 Servloe
116' KB
7. Unit or Property Name
Middle Ground Shoal
8. Well Number '
, A34·11LS
[S. Permit Number
4. Location or well at surface
1624' .Fal & 430' FE!. Se.c. 11-8N-1SW, S. M.
At tOop of productive inteMlI
415&" JI$L & neT' fE!. 8e.ç. 11-8N-13W, S. M.
At effactlvB depth
86-88
At totcl depth
581' FNL &, ~289' FEL Sec. 14..sN.13W. S.M.
12, --present well condlt1cn summary
10. API Number
&D-7ª~-10084-Ð2
11. Field 1JInd Pool
MGS "G·' PooJ
Total depth:
Efrectlve depth:
Casing
structural
Conduotor
Surface
I nt"rmeriJate
Producllon
LIner
PerfQmtlon depth:
measured
truII: vertical
measured
true vertical
feet
feet
fQlt
feet
Plugs (measured)
ORIGINAL
11 ,209
8,823
11 ,205
9,820
Junk (mlililliourliid)
length
Size
Cemented MD TVD
370' 370'
1900 sx 1&50' 1840.8'
1100 $X &747' 8308'
2200 sX 10326' 9297'
310sx 9472' 1'776'
Slotted Liner 11105' 8920'
370'
166D'
24"
13-3/8"
8741'
3898'
1397'
1811.'
9~18"
7"
¡"
3-1/2"
measured
NA - Slotted Liner
True vertical
RECJE~VED
2-7J8" 15.6# LBO/N&O Ird EUE, EOT @ 7479'
TUbing (size, grade :and measured de~h)
o~! I~ 27 2000
Packers and SSSV (type and measured depth}
t~ia:ßka Oii~ Gas Com~. '~ommlsaron
Arwht)f~~
13. Attaohments
[XI Desoription of Sumí:Jry Propo$,,-I
, ¡XfDetalled Operationt'i Program
15. Status of well classification as:
[*) BOP Sketch
~On file wlAOGCC
14. Estimated date for commanclI1g operatIon
7/9/00
16, If proposal was verb:ally approved
JX10il
[ ] SU:iipõlndild
[ ] G~5
Name 01 apprcv"r Date Approved Servloe
Contar;f Enginettr N"melNumbsr: PfY!Ipared By Neme/NlJmb9r:
, 7, I hereby certlf~at ~ fl)re goIng Je'trü~· nand c'or ct to the beet of my knowledge
~ -==--. . ..n Title Susan I. Sudduth, Sr. Engineering Technician
Sig",:,,~ - -1~' ~~I Ph (406)319.3213
-, Comml.s:tlifon Use Only
Conditions of Approval: Notify Commissiolj,..SlO representative may witness
, Plug Integrity ~ BOP Test V Location Clearance
MechenlCà.l/ntegrlty T8I8t _ Subsequentform required 10- If 0"1
Date: 22-Jun-OO
IApproval No,3::O-¡a'}&j'
ORIG\NAL SiGNED S'V
Ú (aylor s~mount
Date I/J I 2 t; Ið()
s:rJit I~ -K¡(¡i~at9
Approvecl by order of the Commission
'F orm 10-403 ReI¡, 06115/68
Co mm I $$10 ner
""Ó CO\J'l
...,-0"....
~
RECE!VED
JUL 0 1 2005
Alaska Oii & Gas Cons. Commission
fmt:hr.m~ge
~TO
A~RGY
XTO Energy Inc.
200 North Loraine
Suite 800
Midland, Texas 79701
432-682-8873
432-687-0862 (Fax)
June 29, 2005
Alaska Oil and Gas Conservation Commission
Attn: Mr. John Norman
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
øff""
t~'¡'" ¡''''''''''
...~,?>
RE: Well Completion Report: Well A34-11LS P&A
Dear Mr. Norman,
XTO Energy, Inc. hereby submits its Well Completion Report (Form 10-407) for the work performed to
plug and abandon well A34-11 LS on Platform A, in the Middle Ground Shoal Field of Cook Inlet, AK
back in Sept 2000. After the abandonment of the lower portion of the wellbore, the well was ,/
sidetracked as the A34-11 LS2. It was recently brought to my attention while submitting a Sundry for ..-
the A34-11 LS2 that the 10-407 was never filed back in 2000 when the Oklahoma District office
operated the Alaska properties. I apologize for this mistake.
Please find attached the following information for your files:
1. Form 1 0-407 Well Completion
2. Daily Operations Report
3. Post P&A Wellbore Schematic
If you have any questions or require additional information, please contact me at (432) 620-6743.
Sincerely,
9uJcI- Ý
Paul L. Figel
Engineering Manager
Cc: Scott Griffith
Tim Smith
SÇl\NNED i~UG 0 2. 2005
STATE OF ALASKA
,~ ALASKA OIL AND GAS CONSERVATION COMMISSION
1a. Well s~sELL o~O~:'6E!~~~ O~a~o:~00M~~;nT.~gN w~~?~,~EAA=D
20AAC25.105 20AAC25.110 . DevelopmentJ8t 0 1 Et81ßj1toryD
No. of Completions 1 Other Service 0 StratlgraP0ic Tes~ D
5. Date Comp., Susp., or 12JUmim t)jP&1 ~~,~ _ Commission
,/
Aband.: 9/22/00 95-88 AI1 r~~p.
6. Date Spudded: 13. API Number:
July 1,1995 50-733-10 4-02
7. Date TD Reached: 14. Well N
July 31,1995 A3 1LS
8. KB Elevation (ft): 'eld/Pool(s):
38' MGSIG Pool
9. Plug Back Depth(MD+ TVD .
7219' + 6756'
10. Total Depth (MD +
Zone- 11,209' + 9824' '
Zone- HR 11. Depth Wher SSV Set:
Zone- HC NA
19. Water
73
GINJ 0 WINJ 0 WDSPL D
12. Operator Name:
IXTO Energy Inc.
13. Address:
:200 North Loraine, Suite 800, Midland, Texas 79701
4a. Location of ~ell (Governmental Section): Platform A, Leg 1
Surface: Cond 4,1624' FSL, 430' FEL, Sec 11, T8N, R13W, S.M.
Top of Productive Horizon:
469' FSL, 2367' FEL, Sec 11, T8N, R13W, S.M.
Total Depth:
561' FNL, 2286' FEL, Sec 14, T8N, R13W, S.M.
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 232790 y- 2485843
TPI: x- 231217 y- 2483821
Total Depth: x- 230078 y- 2483061
18. Directional Survey: Yes 0 No 0
21. Logs Run:
NA
,22.
CASING WT. PER GRADE
FT.
13-3/8 " 54.5 J55
9-518" 43.5-47 N80
7" 29 L80
5" 18 P110
3-1/2" 9.2 N80
CASING, LINER AND MENTING RECORD
SETTING DEPTH MD SETI G DEPTH TVD
TOP BOTTOM P BOTTOM HOLE SIZE
Surf 1664' 1661'
Surf 6427' 6308'
6427' 8318' 7811'
8081' 9480' 8785'
9402' 11,205' 9822'
17-1/2"
12·1/4"
8-112"
6"
4-1 18"
and Bottom /
tJ'1
LV'l,rð"
24.
SIZE
NA
16. Property Designation:
ADL-18756
17. Land Use Permit:
NA
20. Thickness of Permafrost:
NA
CEMENTING RECORD
AMOUNT
PULLED
o
o
o
o
o
1900 sxs
1100 sxs
2200 sxs
310 sxs
Slotted Liner
TUBING RECORD
DEPTH SET (MD) PACKER SET (MD)
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
8120' 150 sxs cmt
9320' 91 sxs cmt
Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio:
Test Period -+
Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity - API (corr):
24-Hour Rate ...
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.):
26.
Date First Production:
NA
Date of Test:
Flow Tubing
I Press.
;27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". __Ab~r'){¡"'4-lf
NA j~.
Casing Press:
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE
~~~~,-:>f.~:.;_._' ;
NAME
GEOLOGIC MARKERS
MD
TVD
29. FORMATION TESTS
Include and briefly summarize test results. List intervals tested, ànd attach'
detailed supporting data as necessary. If no tests were conducted, state
"None".
28.
NA
30. list of Attachments:
Wellbore Schematic and Daily Operations Report
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Paul Figel
Printed Name: Paul Figel
( ) _ / .A. r;:.:/,
Signature: r ~ P . r
Title: Engineering Manager
Phone: 432-620-6743
Date: 6/29/2005
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is
changed.
Item 1 a: Classification of Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for
Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool
completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on
this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show
the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately
produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other
(explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
XTO ENERGY, INC.
WELL: A34-11LS
DAILY DRILLING REPORTS Alaska Oil & Gas Cons. CommissioÌiÎ
OBJECTIVE: P&A A34-11LS for Sidetrack A34-11LSQeh[}n:]~e
RECEIVE[)
JUL 0 1 Z005
9-13-00 MIRU derrick. Prepare decks.
9-16-00 RU Circ lines. Fill ann. Pmp tbg vol wfFIW. Monitor well before setting BPV & ND
tree.
9-17 -00 Set BPV & ND tree. MU landing jt & pull tree. NU BOP, flow line, trip tank line, chk
line, fab kill line, & install pollution pans. Pull BPV. Install 2-way check. RU tst assy.
Tst Hydril250 & 2500 psi and 250 & 5000 psi on stack & chk lines. Tst accum & gas
alarms.
9/18/00 Pull2-way chk. Attempt to pull tbg hanger. MU 2 DC's, jar & bumper sub. Jar hanger
free. Pull 65k over to reI pkr. Pull hanger above rotary. Circ btms up plus tbg vol thru
gas buster. Monitor well. Hole taking 7-8 BPH. Pull & LD 2-7/8" 6.5# 8rd EUE tbg,
checking for norm. BOP body tst 250/5000 psi & 3-Y2 rams 250/5000 psi. Well has
taken 177 bbls last 24 hrs.
09/19/00 Rlli w/5" csg scraper. PU 3-Y2" DP. RIH to 9388'. Wash thru tight spots @ 8062'-
8075' & 8308' -8462'. Pmp 20 bbl Hi-Vis Sweep. Circ btms up. POOH w/5" csg
scraper. RIH w/5" Baker cmt retainer. Hole has taken a tot of 241 bbls of fluid.
9/20/00 Set cmt retainer @ 9320'. Unsting. Circ DP vol. RU BJ. Press tst lines to 6000 psi.
Sting into retainer. EIR of 3 bpm @ 3500 psi. Pmp 15 BFW pre-flush, follow w/ 18.5
bbl (91 sx Class G cmt + 0.05% BWOC R-l + 0.3% BWOC CD-32 + 0.6 BWOC FL-
33 + 1 Gal/l00 sx FP-6L + 43.7% FW. Displ w/57 BFW. Pull out of retainer. Lay 2
bbl on top of BP.
9/21/00 Rev circ btms up. POOH w/Baker 5" rtnr stinger. MlU 4-1/8" mill tooth bit to tag cmt.
Rlli tag hard cmt @ 9242'. Held 15000 wt. Mix & pmp 25 bbl of 50 Vis 9.3 ppg
spacer (fill f/top of cmt to 7950' w/wt mud). POOH. LD Bit. MlU & RIH w/Baker 5"
cmt retainer to be set @ 8120'.
9/22/00 Set Baker 5" cmt retainer @ 8120'. Sting out. Circ DP vol. RlU BJ. Pmp 5 BFW. Mix
& pmp 31 bbl of Class G cmt mixed as: 150 sx Class G cmt + 0.05% BWOC R-1 +
0.3% BWOC CD-32 + 0.6% BWOC FL-33 + 1 Gal/100 sx FP-6L + 43.7% FW. Pump
9 bbl FW & displ w/36 bbl FW. POOH 10 stds. Rev circ DP vol. POOH. LD Baker
stinger. RIH w/ 6" junk bit to tag cmt. Tag cmt @ 7219'. Held 15000# wt. Pmp 85 bbl
of 47 vis 9.3 wt mud. POOH & LD 3-Y2" DP.
~TO
~kRGY
MGS A34-11 LS
Cook Inlet, Alaska
Leg 1, Conductor 4
API No.: 50-733-10084-02
Original Spud: Oct'65 (A23-12)
Sidetrack A34-11: 11-2-84
Sidetrack A34-11 LS: 7-1-95
Surf Csg: 13-3/8" 54.5# J55 BTC.
Set @ 1664'. Cmt'd wI 1900 sx.
Intermediate: 9-5/8" 43.5- 47# N80.
Set @ 6747'. Cmt'd wI 1100 sx.
Drilling Liner: 5" 18# P11 0 STL.
Set @ 9480'. TOl @ 8081'.
Cmt'd wI 310 sx.
P&A'd 9-21-00 for Sidetrack A34-11 LS2
Current Status
.-"""
. ",i'" ,~: 'i' ,/, ',','
R,,:i,',"'"~'''''''''
f ,,~, ,1",1",:,.,: ,I
\"'~ ',II' n
B:·, '","
'I,,', ,'"
" . ," ~t, ,'I-
RECEIVED
JUL 0 1 Z5B56-28-05
1~!lasIÅ’ Oil & Ga~~ COilS_ Commis$km
KB: 38' t~r~r:hl~~'a[18
Water Depth: 7~~ KAsf.
GN-GO: 7587 - 7610'
GR-GS: 7962 - 8010'
5" Cmt Retainer @ 8120'. P&A'd wI 150 sk cmt.
TOC @ 7219' (9-21-00).
5" Cmt Retainer @ 9320'.
P&A 'd wI 91 sk cmt. (9-20-00).
Prod Liner: 3-%" 9.2# N80 BTC slotted.
Set @ 11,205'. TOl @ 9402'.
Slotted Liner Reverse Penetration:
HR-HN-HK-H I-HF-HE-HD-HC.
TO: 11,209' MD (9824' TVD) ¿
THE MATERIAL
UNDER THIS COVER HAS BEEN
MICROFILMED
·
ON OR BEFORE
JANUARY 03 2001
M
PL
A T
W
E IA L UNDER
T H
ISM
A R K E R
C-J~ORlkMFILM.DOC '
AMENDED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
Type of Request:
[X] Abandon E, F & G Pool [ ] Suspend
[ ] Alter Casing [ ] Repair Well
[ ] Change Approved Program [ ] Operation Shutdown
Name of Operator
Cross Timbers Operating Company
Address
210 Park Avenue, Ste. 2350, Oklahoma City, OK 73102
] Plugging
] Pull Tubing
] Re- Enter Suspended Well
5. Type of well:
[X] Development
[ ] Exploratory
[ ] Stratigraphic
[ ] Service
] Time Extension [ ] Perforate
] Variance [ ] Other
] Stimulate
6. Datum Elevation (DF or KB)
116' KB
7, Unit or Property Name
Middle Ground Shoal
Location of well at surface
1624' FSL & 450' FEL Sec. 11-SN-13W, S. M.
At top of productive interval
469' FSL & 2367' FEL Sec. 11-SN-13W, S. M.
At effective depth
At total depth
561' FNL & 2286' FEL Sec. 14-8N-13W, S.M.
8. Well Number
A34-11LS
9. Permit Number
95-88
10. APl Number
50-733-10084-02
11. Field and Pool
MGS "G" Pool
12. Present well condition summary
Total depth: measured 11,209
true vertical 9,823
Effective depth: measured 11,205
true vertical 9,820
feet
feet
feet
feet
Plugs (measured)
Junk (measured)
ORIGINAL
Casing Length
Structural
Conductor
Surface
Intermediate
Production
Liner
370'
1650'
6747'
3898'
1397'
1811'
Size
24"
13-3/8"
9-5/8"
7"
3-1/2"
Cemented
..
1900 sx
1100 sx
2200 sx
310 sx
Slotted Liner
MD TVD
370' 370'
1650' 1640.8'
6747' 6308'
10325' 9297'
9472' 8776'
11205' 9820'
Perforation depth:
measured
True vertical
NA - Slotted Liner
Tubing (size, grade and measured depth)
2-7/8" 6.5# LS0/NS0 8rd EUE. EOT @ 7479'
2000
Packers and SSSV (type and measured depth)
13. Attachments [X] Description of Sumary Proposal [X] Detailed Operations Program [*] BOP Sketch
*On file w/AOGCC
14. 15.
16.
Estimated date for commencing operation
7/9/00
If proposal was verbally approved
Name of approver
Status of well classification as:
[X] Oil [ ] Gas
Service
Date Approved
Contact Engineer Name/Number: Prepared By Name/Number:
17. I hereby certify that ~,,e foregoing is true and corr, ect to the best of my knowledge
~r~_~ /~'i,~~ Title Susan I. Sudduth, Sr. Engineering Technician
Si Ph (405)$19-3213
Commission Use Only
[ ] Suspended
Conditions of Approval:
Notify Commiss!~,~o representative may witness
Plug integrity F BOP Test ~
Date: 22-Jun-00
IApproval No,.~
Mechanical Integrity Test__
Location Clearance
Subsequent form required 10-
Approved by order of the Commission
Form 10-403 Rev. 06/15/88
oRiGINAL SIGNED BY
D Taylor Seamount
Commissioner
Date ~__~/~2/~
Su~r~it In -I'~¢licat~
Cross Timbers Operating Company
MGS A34-11LS2
AMENDED
Sidetrack Procedure
Move rig over well. Install BPV, N/D tree, N/U BOPE. Test BOPE to 5,000 psi.
P/U on tubing, pull packer loose and displace well to 9.0 ppg water-base drilling fluid
POH with tubing, checking for NORM while POH. L/D tubing and completion jewelry
and send to shore.
P/U 3-1/2" drill pipe, IH and abandon 3-1/2" slotted liner as follows (Notify the
AOGCC at least 24 hrs in advance): Set a cement retainer at 9,320'MD in the 5" liner
and squeeze sufficient cement below it to fill the 5" liner and 3-1/2" slotted liner to
11,209'MD (5" liner shoe) plus an additional 100' of 3-1/2" slotted liner to 9,572'MD.
Pull out of retainer and place a 75' cement cap on top.
Pull up, reverse out and WOC. Weight-test cement plug with 15,000#.
Abandon the perforations at 7,587' - 8,010'MD by setting a balanced cement plug from
7,450' to 8,120'MD.
Pull up, reverse out and WOC. Weight-test cement plug with 15,000#. POH.
R/H with 9-5/8" one-trip whipstock. Orient and set whipstock at 5,650'MD and mill an
8-1/2" window in 9-5/8" casing.
Directionally drill 8-1/2" hole from 5,650' to 9,050'~MD.
Run and cement 7", 26#, N-80 BTC liner at 9,020'MD with TOL at approximately
5,350'MD (-300' of lap).
Clean out liner to float collar and pressure-test well to 3,000 psi for 30 minutes
Drill out liner shoe and displace well to 8.1 ppg oil-base drilling fluid
Drill approximately 20' of new hole and conduct leak-off test
Directionally drill 6" hole from 9,020' to 10,540'MD.
i;',! 2 7 2000
Ala~i:a O:i ~. Gas Cons, :j;ommission
Run and cement 5", 17.95#, L-80, STL liner at 10,526'MD with TOL at approximately
8,700' (-300' of lap).
Clean out liner and test liner lap to 3,000 psi for 30 minutes. Displace well to filtered
Inlet water
Run 2-3/8", 4.7#, N-80, 8rd EUE completion with gas lift design.
Pickle inside of tubing with HC1/xylene and circulate inhibited filtered Inlet water into
annulus before setting packer.
N/D BOPE, N/U tree. Test tree to 5,000 psi. Release rig
Cross Timbers Operating Co.
MGS A34-11LS2
Spud: Planned 7/9/2000
(Original wellbore spudded 11/
2/84 (Plugged A23-11 slot)
Sidetrack A34-11LS was
spudded 7/2/95.)
Proposed: KOP @ 5650'.
7" 26# N80 BTC liner 5350-9020'.
Proposed Completion
Surf Csg: 13 3/8" 54.5# J55 @ 1644'
Intermediate Csg: 9 5/8" 43.5 & 46# N80 @ 6747'
Original WB: 7" 29# L80 @ 10330'
Prod Csg: 9 5/8", 43.5/47 lb, N80. Set @ 6747'.
Cmt'd w/900 sx G (13 ppg, 1.96 cuff) & 200sx G
(15.9 ppg 1.14 cuff).
Proposed Tbg: 2 7/8" 6.5# N80
8R EUE @ 8700' wi Bkr DB
pkr assembly and GLMs
7" Liner (Original WB): 29# L80. Set @ 10330'.
Cmt w/2200 sx.
Proposed Cmt plug 7450-8120'
GN-GO 7587-7610
GR-GS 7962-8010
Sidetrack 3411LS: Whipstock
8338'. KOP 8339'. 5" 18# P110
STL liner 8075-9472'.
Proposed: 5" 17.95#
L80 STL liner: 8700-
10540'. Cmt'd
Perforations: Hemlock
Proposed TD
10540'
L
TOC 8338'
HC-HZ 8310-9640'
Orig TD 10325'
TD 11209'
Proposed Cmt Retainer @
9320'. 75' cmt on top and cmt to
11209'.
Slotted Liner: 3 1/2" 9.2# N80
BTC(spec clear cplgs) 9394-
11205'
Cross Timbers Operating Co.
MGS A34-11LS
Spud: Planned 7/9/2000
(Original wellbore spudded 11/
2/84 (Plugged A23-11 slot)
Sidetrack A34-11 LS was
spudded 7/2/95.)
Present Completion
x
Surf Csg: 13 3/8" 54.5# J55 @ 1644'
Intermediate Csg: 9 5/8" 43.5 & 46# N80 @ 6747'
Original WB: 7" 29# L80 @ 10330'
Prod Csg: 9 5~8", 43.5~47 lb, N80. Set @ 6747'.
Cmt'd w/900 sx G (13 ppg, 1.96 cuft) & 200sx G
(15.9 ppg 1.14 cuff).
Tbg: 2 7/8" 6.5# L80/N80 8R EUE. EOT @
7479'. X nipple @ 7367' (2.313" ID)Bkr FH pkr
@ 7406' w/40K shear. XN nipple @ 7446'
(2.505" ID)
7" Liner (Original WB): 29# L80. Set @ 10330'.
Cmt w/2200 sx.
GN-GO 7587-7610
GR-GS 7962-8010
Sidetrack 3411LS: Whipstock
8338'. KOP 8339'. 5" 18# P110
STL liner 8075-9472'.
TOC 8338'
HC-HZ 8310-9640'
Orig TD 10325'
TD 11209'
Slotted Liner: 3 1/2" 9.2# N80
BTC(spec clear cplgs) 9394-
11205'
[Fwd: Plug Well MGS A-34LS]
Subject: [Fwd: Plug Well MGS A-34LS]
Date: Tue, 20 Jun 2000 14:55:10 -0800
From: Blair Wondzell <blair_wondzell~admin.state.ak.us>
Organization: State of Alaska, Dept of Admin, Oil & Gas
To: Doug Schultze <doug_schultze~xtookc.com>
Doug,
The one to Charles was not delivered.
Hope this one is.
Sincerely, Blair
Subject: Plug Well MGS A-34LS
Date: Tue, 20 Jun 2000 14:50:12 -0800
From: Blair Wondzell <blair wondzell~admin.state.ak.us>
Organization: State of Alaska, Dept of Admin, Oil & Gas
To: Charles Pope <cpope~xtookc.com>
CC: Tom Maunder <tom maunder~admin.state.ak.us>
Charles,
The 403 request shows the 7" liner, the 5" liner and the 3.5" liners
are full casing strings. We believe this is in error. We believe they
are liners. Please revise the 403 to reflect the actual conditions.
Plugging the 3.5" slotted liner - this liner appears to be hung at
9394' with shoe at 11,205' - 1811' in length. The 403 states that you
plan to plug the liner to 9572' - (178') leaving 1633' of slotted liner
unplugged. We don't believe this is a good way to go. Please revise
your program to plug the liner so the sands are segregated.
Sincerely, Blair Wondzell
1 of 1 6/20/00 3:40 PM
5-1,5- 0 '
13:57 '
From the Office of
Bill Penrose
Date: Mlty_,.I._5., 2000
To:
Blair Wondzel! Fax: 276-7542
Pages: 2 (including cover)
Proposed Abandonment
Message:
Blair,
For Cross Timbers, we propose to sidetrack Well A34-I ILS (schematic attached) at
5,650'MD in the 9-5/8" casing. First, we need to abandon the old hole for which 1
propose the following:
Per 20AAC25.112(b)(2), abandon the slotted liner completion: Set a cement retainer at'.
9,320'MD in the 5" liner (-75' above tho TeL) and squeeze sufficient cement below it to
fill the 5" liner and 3-1/2" slotted liner to 9.,472'MD (5" liner shoe) and an additional 100'
of 3-1/2" slotted liner [o 9,572'MD.
and
Per 20AAC25.112(c)(1)(A), abandon the perfs at 7,587' - 8,010': Set a balanced ce~nent
plug from 7,450' to 8, !207MD.
What do you think?
'~~" Fairweather E&P Services, Inc. D
E-maih bill~fairweather, com
MAY 1
2000
Alaska Oii& Gas Cons. Commission
P E R k~ Z T
95--~088 6858
95 .... 08 S 6859
95 ..... 088 FORk~ATION TOPS
95 -'- (388 I N D/R E S / ,3 R
95 088 LDT'/'3R
95 ~ 088 k'i U P
9.5 .... 088 PIL/GR
ff-
,3,3 C ]: r'~ d 'i' v '¥ d u ,::i 'J ~,,',I e. '1 'J i:' ,::~ ,:i :::.:"
'¥ c a 'i h'l a-i-- e r" '~ a '1 s ]/: n v e n 1: c> r' y !], a !: e ~
D A T A_F' L !..I S R I..! N
. . , /'S F' '1
8215 .....9518 D;;[TE/LDT/GR/AI'4S,
8996 .....112~8 IE:T/GR 2
~0~ .... I i 209
9~85 ...... I i20a-, 2
8326--9~20 1
9485 ..... I i209 'i
~8326 ...... 9a52 1
D~ T
~{ ",'
d'~'t.:ch sampies
Shell Western E&P Inc.
An affiliate of Shell Oil Company
P. O. Box 576
Houston, TX 77001
January 29,1996
Alaska Oil and Gas Conservation Commission
3001 Porcupine Ddve
Anchorage, AK 99501
Gentlemen:
SUBJECT: SUBMITTAL OF REPORT OF SUNDRY WELL OPERATIONS
(FORM 10-404) for MIDDLE GROUND SHOAL A34-11LS
Enclosed in duplicate is the Report of Sundry Well Operations for Middle Ground Shoal
A34-11LS. Perforation operations were completed November 21, 1995.
If you have any questions or wish to discuss, please call Marcus Winder at (713) 544-3797
or Alan F0glesong at (907) 776-2509.
Sincerely, ~ ~,
//'~.,j G. S. Nady
?-Manager- Asset Administration
Western Asset
Enclosures
MGS404.DOC- 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown~ Stimulate
Pull tubing ~ After casing ~
2. Name of Operator
Shell Weste~'p E,f,p Inc.
3. Address
P.O. Box 576, Houston, TX
4. Location of well at surface
(WCK 6265)
77001-0576
1624' FSL & 430' FEL Sll, T8N,
At top of productive interval
At effective depth
At total depth
11209' HD-KB: 1218' FNL &
Plugging~ Perforate X
Repair well Other
5. Type of Well:
R13W, SR
Development X
Exploratory
Stratigraphic
Service
3081' FEL S14, T8N, R13W, SM
6. Datum elevation (DF or KB)
]]6' I(R feet
7. Unit or Property name
MTDDLE GROUND SHOAL
8. Well number
A34-11LS
9. Permit num_~/al~Droval number~ J__
10. APl n"b/l~l="==~ '
50- 733-10084-02
11. Field/Pool
HGS "E", "F", & "G" POOLS
12. Present well condition summary
Total depth: measured
true vertical
11209 feet Plugs (measured)
9823 feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth
Structural
Conductor
Surface 1644' 13-3/8" 1900 SX 0 - 1644'
Intermediate 6747' 9-5/8" 1100 SX 0- 6747'
Production 3045' 7" 2510 SX 6427' - 9472'
Liner 1811' 3-1/2" SLOTTED LNR 9394'- 11205'
Perforation depth: measured
7587' - 7610', 7986' - 7962'; SLOTTED LNR FROR 9472' - 11,205
true vertical
True vertical depth
Tubing (size, grade, and measured depth) FEB 0 5
2-7/8", 6,5#. L-80/N-80 8RD EUE FROM 0' - 7479'
Packers and SSSV (type and measured depth)
~,Jas[(,a Oil &, ~-~: Cons.
BAKER "FH" PKR e 7406'; BAKER TRSCSSV e 322'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Pdor to well operation 76
Subsequent to operation 84
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
104 6 550
139 4 600
Tubing pressure
90
150
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations X
1(5. Status of well classification as:
Oil ~( Gas Suspended Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ¢.
Form 10-404 Rev 06/15/88
S. NAD~itle MGR. - ASSET ADliIN.
Date 1/29/96
- 44 -
SUBMIT IN DUPLICATE
IO'd -fdlOl
DATE:
RIG uP SCHLUMBERGER AND PRESSURE TEST LUBRICATOR TO.
:HOLD' PRE-JOB SAFETY MEETING.
:RIG ~~ SCHLUMBERGER.
TIME:
,,
COST: i
,!
SCHLUMBER.GER:
INLET .I~!LI~ING:
SVVEPI: !; 'i
'.
TOTAL:}~ :
.
,
$ 1,8,938.00
$ 9¢, 6.00
$ 750.00
$ 20,6.34.00
COMM .!~1¥S:, ' :JOB WENT GREAT: NO ACCIDENTS.
·
Page 1
Shell Western E&P Inc.
An affiliate of Shell Oil Company
130 Trading Bay, Suite 310
Kenai, AK 99611
(907) 283-3096
October 12, 1995
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: SUBMISSION OF FORM 10-403 APPLICATION FOR SUNDRY APPROVAL
TO REPERFORATE WELL NO. A34-11LS.
Enclosed in triplicate is the Application for Sundry Approval, Form 10-403, to reperforate the
"E" and "F" pools on A34-1 ILS. Operations are expected to begin October 24, 1995.
If you have any questions, please don't hesitate to call me at (907) 283-2509. Thank you!
Sincerely,
Alan Foglesong
Senior Production Engineer
OCT I 3 1995
A~aska U~l & Gas Cons, Commiss[o~
Anchorage
Enclosures
cc:
Platform "A" Well Files
J. M. Winder, WCK 5237
Western Asset File Room - WCK 6220
Kenai Engineering Files - MGS "A34-1 ILS" - Category 5.6120
Kenai Operations Files
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon__ Suspend __
After casing __ Repair well
Change approved program __
Operation shutdown Re-enter suspended well
Plugging__ Time extension Stimulate__
Pull tubing__ Variance __ Perforate ~L.
Other
2. Name of Operator
Shell Western E&P ]:nc.
3. Address
130 Trading Bay, #310 Kenai, Al< 99611
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
4. Location of well at surface
1624'FSL & 430'FEL, S11, T8N, R13W, SM
At top of productive interval
At effective depth
At total depth
11209'MD-KB: 1218'FNL & 3081'FEL, S14, T8N, R13W, SM
6. Datum elevation (DF or KB)
116' KB feet
7. Unit or Property name
Hiddle 6round Shoal
8. Well number
A34-11LS
9. Permit number
95-88
10. APl number
50- 733-10084-02
11. Field/Pool
MGS "E", "F", & "G" Pools
12. Present well condition summary
Total depth: measured 11209 feet
true vertical 9823 feet
Plugs (measured)
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length
Structural
Conductor
Surface 1644'
Intermediate 6747'
Production 3045'
Liner 1811'
Perforation depth: measured
Size Cemented
Measured depth
13-3/8",54.5~,J-55 1900 sx
9-5/8",43.5/47#,N80 1100 sx
7"29#L80&5"18¢~P110 2510 sx
3-1/2",9.2¢,N-80 Slotted Lnr
0' - 1644'
0' - 6747'
6427' 9472'
9394' 11205'
7590' - 7613', 7962' - 8010', slotted liner from 9472' - 11,205'
true vertical
True vertical depth
Tubing (size, grade, and measured depth)
2-7/8", 6.5~, L-80/N-80 8rd EUE from 0' - 7479'
0CT '13 1995
Packers and SSSV (type and measured depth)
Baker "FH" Packer Ia 7406'; Baker TRSCSSV Ia 322'
Gas Cons. Commission
Anchorage BOP sketch
13. Attachments
Description summary of proposal X
Detailed operations program
14. Estimated date for commencing operation
October 24, 1995
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas
Service
Suspended
17. I hereby~,Cf~t.!a.t the forests tr~/~ and correct to the best of my knowledge.
Signed ~~ ~____~~~~¢ Title Sr. Production Engineer
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~ Location clearance ~
Mechanical Integrity Test ~ Subsequent form required 10- /-'/O/~
Approved by order of the Commission
· g nal Signed By
,. W. Johnston
Date ,,,; O/~F¢~~'-
JApproval No. ~;) ~j] /
Approved Copy
Relurned
Commissioner
Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
MIDDLE GROUND SHOAL No. A34-11LS
REPERFORATE "E" (GN-GO) and "F" (GR-GS) POOLS
NOTE:
The existing GN-GO and GR-GS perforations were left open during drilling on A34-1 ILS
which may have impaired the production from these intervals. Furthermore, cement was
brought up across the existing perforations during the cementing of the 5" liner on A34-11LS,
so the existing perforations may no longer be fully open. Therefore, the objective of this
procedure is to reperforate these intervals.
1. Continue to gas lift well to provide underbalanced perforating conditions.
Make a slickline gauge ring run to ensure that the tubing is free from obstruction. Discuss with the
SWEPI wireline operator what size gauge ring to run. (Discuss this step with SWEPI wireline
operator. Since this well has been drilled recently, it may not be necessary to make a gauge ring run.)
3. RU Schlumberger Electric Wireline Unit (EWLU) with 2 1/8" Retrievable Strip Phased Enerjet
perforating guns (180 degree phasing). Test lubricator to 3500 psi. Perforate as follows.
(a) RIH and correlate to Dresser Atlas CBL/GR Log run #1 for A34-11 (well prior to sidetracking to
A34-1 ILS) dated December 28, 1984 (correlate with GR portion of this log). Use color coded
markers to flag wireline depths as needed to aid depth correlation during subsequent perforating
operations.
(b) Perforate 6 JSPF in the GR-GS CF" Pool) from 7962'-8010' through tubing while gas lifting. (A
total of 2 trips with a 34' gun will be required to perforate this interval.)
(c) Perforate 6 JSPF in the GN-GO ("E" Pool ) from 7590'-7613' through tubing while gas lifting. (A
total of 1 trip with a 34' gun will be required to perforate this interval.)
(d) RD EWLU. Test well and report.
NOTE: Reduce gas injection when guns are at or above the SSSV nipple to prevent surging guns
into the lubricator when Rill and POOH.
NOTE: This through tubing perforating operation will be charged to the completion work order for
A34-11LS (SWEPI AFE #731411, SCI AFE # 731431) since this work was provided for in
the scope of the drilling and completion AFE.
Alaska Oil & Gas Cor~s. Commission
Anchorage
c 5files\prog\a34-11 ls.prg
MIDDLE GROUND SHOAL A34-11LS
COMPLETION EQUIPMENT DETAIL - 10/11/95
OCT 1 ~ 1995
XXX
Oil & Gas Cons. CommissioB
Anchorage
/
5" 18#XI
P-110 /
STL 1 iDer
from /
8075'- /
9472'/
(no cmt /
9150'- /
9472') /
/
/
/ /
3.5"
9.2#
N-80
BTC
slot / \
liDer /
9394' -11205'
()
1
~4
X
5
XXX <
<-
TRSCSSV wi th "X" Profile @ 322'
24" Conductor Casing @ 370'
13-3/8" 54.5# J-55 Surface Casing @ 1644'
2-7/8" 6.5# 8rd EUE L-80/N-80 Tubing
GLM MD ~TVD PORT Ptro Psc Pso GAS
1 1902' 1899' 12 930 883 950 ---
2 3631' 3500' 12 915 865 915
3 4951' 4690' 16 965 838 906
4 5971' 5590' 16 950 817 869
5 6727' 6289' 20 1040 789 856
6 7329' 6861' ORIFICE 5/16"
Top of 7" Production Liner @ 6427'
_~ 9-5/8" 43.5#/47# N-80 Casing @ 6747'
GLM #6 @ 7329' MD
1 jt 2-7/8" 6.5# L-80/N-80 8rd EUE tubing
OTIS "X" Nipple @ 7367' (2.313" I.D.)
1 jt 2-7/8" 6.5# L-80/N-80 8rd EUE tubing
BAKER "FH" Packer @ 7406' w/4OM# shear
1 jt 2-7/8" 6.5# L-80/N-80 8rd EUE tubing
OTIS "XN" Nipple @ 7446' (2.205"ID)
1 jt 2-7/8" 6.5# L-80/N-80 8rd EUE tubing
Wireline Re-Entry Guide @ 7479'
/
/
/
/
/
/
/
/
/
/
TD:ll209'
GN-GO 7590'- 7613'; GR-GS 7962'-8010'
Window from 8318'-8339'
Whipstock @ 8338' (bottom of whipstock)
KOP @ 8339'
Production on GST through 3 1/2" slotted liner
(liner has BTC special clearance couplings)
< ....... TOP OF CEMENT PLUGBACK @ 8338' MD
/ / / / / Perforations in old hole
/ / / / /:: HC-HD 8310-85',HE-HF 8462-90',HI-HK 8570-8618'
/ / / / /:: HK-HN 8628-76',8682-96',8703-43',8747-8956'
/ / / / /:= HN-HR 9000- 9136', HR-HZ 9200-9480',9610-40'
I < BOTTOM OF CEMENT PLUGBACK @ ~ 9885' MD
//////// < PBTD : 10242'
........ \ 7" 29# L-80 Production Liner @ 10330'
TD : 10325' on original hole
C'\FI LESXPROGXA3411LS2. PRG
Shell Western E&P lnc
60! W 5th Av Ste 810
Anchorage: AK 99501-2257
State of Alaska
Oil Gas Conservation Commission
3001 Porcupine Drive
An~.hnrnnc~ Ain~kn .¢i_qRFI1 -R1 ~D
907-279-I 433
The following data is hereby acknowledged as being received'
Well Name
MGS A 34-11LS
Description
Mud lad
Copy sent to~Sperator: y~,~o
xi~ ~(;'l-/or~l,ge ~'u.l,71is,~/ol1
.... STATE OF ALASKA
~EE~i::,EE~ ALASKi. ,LAND GAS CONSERVATION CON:,j 3SION
WELL COMPLETION OR RECOMPLETION REPORT'~D LOG
:. ~, o~.,~ I.,':~ I
SHELL WESTERN E&P INC. ~] 95-88
----- ~J~" ' ! 8 APl
3. Addre~ ~~.,! '
P. -0. BOX 576 (HCK 5237); HOUSTON,- TX 7700]_0576uH~mr4 [~-733-Z0084-02
1624'
FSL & 430' FEL S11, T8N, R13W, S.M. ~~~-~[MIDDLE GROUND ~HOAL
116' KB ~ gBk 18756
~. o,,, ~7-02-95 ,~. ~,,, ~.o. a~ 7-30-95 ,~. O,,, ~.. S,~. o, ~. ~ ~. ~,,,~ o~,~. ~, ~,,~,, ~ ,~. ~o. o~ C~,~,, 8-05-9580 ,,, uS~SINGLE
17. Total D~zh (MD+TVD) 18.Plug a~ ~ ~l119. O,r~t~o~l Sur~ 20. Nth wNre SSSV ~t 21. Th,c~n~ of Pe~lr~t
22. Type E~tr~ or Ot~zr L~ Run
D~TE/LDT-D/SGTL/TCCB/~S/PEHA, ~RT~/fiR, GET
CASING. LINER AND CEMENTING RECORD
] J J SE1-TING OEPTH MD
CASING SIZE WT. PER FT. GRADE TOP ~ 80TTOM
13-3/8'Ii 54.5# ! ,1-55 I 0 i 1650'
9-5/8 '!43. 5,47~ N-80 ! 0 ~ 6747'
7" ! 29# ! L-80 i 6427 F10.325'
5" ! lg~ ~ P-1IO i 8981 '! 9480'
3-1/2"1 9.2#! N-80 I 9401 [[1,205'
24. Perfc~'at,on.~ c~en to Production IMO~I-VD of Too ac~d Botzo~ ancl
inttr~II. $i~e and
N/A - SLOTTED LNR
FROM 5" LNR SHOE TO TD
HOLE SIZE
CEMENTING RECORD
1900 SX
I AMOUNT PULLED
I
12-1/4"1 1100 SX
8-]/.2"! 2;~00 ,$× ~
6" i _310 S~( I
4-118"1 SLOTTED LNR ,
25. TUBING RECORD
SIZE
2-7/8"
I DEPTH SET (MO) IPACKERSET IMD!
I 7479' I 7412'
I
26.
ACID. FRACTURE. CEMENT SQUEEZE. ETC.
DEPTH INTERVAL IMDI J AMOUNT & KIND OF MATERIAL USED
N/A I
I
27. PRODUCTION TF.~T
8-05-95 J GAS LIFT
8-16-95 24 I~.S~IOg ~ I 149 92 11 ~ 128 ~ 617
"~ 95 I 620 i:~ou~ RATE ~1 I J J 34,7 '
2E. CORE DATA
~rmf n,-~-~o~ of l,t'nc~c~y. I:N~¢~. f~url~, ioolrl~t air anti
Form 10--4.O7
Re,,,. 7-1-,80 CONTINUED ON REVERSE SIDE
29. 20.
GEOLOGIC ~, ,.;-.ERS JRMATION TESTS
MEAS. DEPTH TRU~ VERT. D~PTH GOR, ~ t~ pi e~ ~.
.
:.
_
SEE A~ACHED
GEOLOGI C MARKER
SUMMARY
2~. LI~ OF A~ACH~EN~
MORNING REPORTS, DIRECTIONAL SURVEY. GEOLOGIC MARKER SUMMARY
ASSET
S ..~ADY ~,,, MGR. ADMIN z~,, 9/~1/95
INSTRUCTIONS
Gene~l: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection,
water disposal, water supply for injection, observation, injection for in-si[u combustion.
item 5: Indicate which elevation is used as reference (where not otherwise ~hown) for depth measurements
given in other maces on this form and in any attachments.
Item 16 and 24: If this well is completed for ~eparate production from more than one interval (multiple
completion), so rcate in item 16, and in item 24 show me producing intervals for only the interval repot-ted
in item 27. Submi~ a ~eparate form for each additional interval to be sec~arately produced, showing the
data pe~inent to ~uch interv-at.
Item 21' Indicate whether from ground level (GL) Or other eleYation (DF, KB, etc.).
Item 22: Att_ached supplemental records for this well should show the details of any multiple staQe cement-
ing ano the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lif~, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none"
Fo.n-n 10--407
- SO -
August31,1995
Shell Western E&P Inc.
An ~ of 8hell Off Company
P. O. Box 576
Houston, TX 77001
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Grant:
SUBJECT:
FORMATION TOPS PICKS FOR THE SWEPI MGS A-34-1 ILS,
MIDDLE GROUND SHOAL FIELD, KENAI BOROUGH, ALASKA
Here is a list of formation tops eacountered in the SWEPI MGS A-34-11LS (Al)I# 50-733-10084-02), as required by
the AOGCC. Please note that this well was drilled through the overturned limb of the Middle Ground Shoal
anticline, so the second set of Hemlock formation tops were encountered in reverse order.
A-34-11LS (KB= 116')
Approximate
Formation Top MD TVD Subsea
HD 8~03' 7,892' -7,776'
HE 8~82' 7,967' -7,851'
I-IF 8,507' 7,991' -7,875'
HI 8,605' 8,079' -7,963'
HK 8,640' 8,109' -7,993'
I-IN 8,836' 8274' -8,158'
HR 9,044' 8,442' -8,326'
HR (overturned) 9,890' 9,063' -8,947'
HN 10,184' 9232' -9,116'
HK 10,505' 9,420' -9,304'
HI 10,607' 9~83' -9,367'
HF 10,772' 9,581' -9,465'
HE 10,861' 9,632' -9,516'
I-~ 10,958' 9,687' -9,571'
HC 11,105' 9,767' -9,651'
TI) 11209' 9,822' -9,708'
If you have any questions, I can be reached at (713) 544-2389.
Very truly yours,
Maria A. Balzarini
Senior Petrophysical Engineer
SEP 2,5 1995
Alaska 0il & Gas Cons. Commission
Anchorage
SWEPI ;tLASKA DAILY DRILLING REPORT
PAGE i OF 1
NAME PLATFORM "A"
~LD MIDDLE GROUND SHOAL
;E PLATFORM
WELL A34-11LS
WORK ORDER 731400
SIDE TRACK
PROG. DEP/'H 11599 ELEVAT. KB TO MSL
PRESENT DEFTH DIST. K]~ TO BHF
FOOTAGE DRILLED NLTA LTH/YTD
SIZE OF LAST CSG 7.000 LTA LTH/YTD
DEP. OF LAST CSG 10325 DAYS SINCE LAST LTA
WATER DEPTH 80 LAST BOP TEST
116.0 DATE
38.4 DAY
/ EST. DAY
/ DAYS +/-
8O9
LAST CSG TEST
06/24/95
2
36
DRILLING FO~: SELTZ R H
PRESEi~T ACTIVITY: NIPPLING UP BOP'S
/GALLOWAY DR
2.00
2.00
1.00
9.00
6.00
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED
PP2 · KILL SPEED
~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
4.00 SKIDDED RIG OVER HOLE AND RIGGED UP ASSOCIATED EQUIPMENT.
RU SLICKLINE UNIT AND LUBRICATOR. T~STED LUBRICATOR TO 2000#.
RIH WI//4 2.25 KICKOFF TOOL. UNABLE TO RUN TOOL BELOW 7057'. POH AND
RD SLICKLINE.
BLED OFF ANNIILUS AND TBG TO PRODUCTION HEADER.
SET BPV AND HELD ON LOCATION SAFET"f MEETING. REMOVED SAFE'fY VAVLE AND
ASSOCIATED PRODUCTION PIPING. ND W~-~LH~ AND NU RISER.
NU BOP'S AND WORK ON HEADERSf CHOKE LINES~ AND OT~ER ASSOCIATED
EQUIPMENT. COMPLETEING BOP RIG UP AT REPORT TIME.
SWEPI ALASKA DAILY DRILLING REPORT
TIME (HRS)
CUM. ROT. HRS
ROTATING
MIID MOTOR
TRIPPING
C&C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH 15.00
TESTING BOP
RUNNING CASING
CEF~E1TrING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN 9.00
WAIT ON WEATHER/MAT
EVALUATION
CORING
PAGE 1 OF 1
RIG NAME PLATFORM "A" PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE 0,6/25/95
~TELD MIDDLE GROUND SHOAL PRESENT DEPTH DIST. KB TO BHF ' 38.4 DAY 3
~E PLATFORM "A" FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 36
WELL A~34-11LS SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/-
WORK ORDER 731400 DEP. OF LAST CSG 10325 DAYS SINCE LAST LTA 810
SIDE TRACK __ WATER DEPTH 80 LAST BOP TEST 06124/95 LAST CSG TEST
DRILLING FOREMAN: SELTZ R H /GALLOWAY DR BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: POH WITH PRODUCTION ,EQUIPMENT P~I ~ KILL SPEED ~
............. PP2 ~ KILL SPEED ~
_
.~ . SUMMARY~O_F ?_PE _RATIONS (SHOW HOURS FOR EAC~ OPERATION)
2.50 COMPLETED RIG UP OF BOP EQUiPmeNT.
3.50 M/U LANDING JT ON HANGER AND TEST BOP'S (BLAIR WANDSEL OF AOGCC
NOTIFIED OF TEST BUT DECLINED TO WITNESS). UNABLE TO TEST h"fDRIL AT
HIGH PSI.
2.50 REMOVE DRIP PAN AlqD PITCHER NIPPLE TO R/U BOP CRADLE.
1.50 BACK OUT LOCK DOWN SCREWS ON WELLHEAD. TWO OF THEM SIEZED UP. UNABLE
TO FREE UP. CHANGED OUT TWO PACKINGS.
6.50 R/D PITCHER NIPPLE AND TEAR DOWN HYDRIL. INSTALL NEW h~fDRIL RUBBER AND
REASSEMBLE krYDRIL.
2.50 INSTALL PITCHER NIPPLE AND RETURN FLOWLINE.
1.00 M/U LANDING JT AND TEST HYDRIL 250/3500#.
1.00 PULL BPV. PULLED HANGER FREE FROM WELLHEAD WITH 180K. PULLED UP 20'
AND R/U CIRCULATING HOSE.
3.00 CIRCULATED OUT LARGE QUANTITES OF GAS IN PREP OF POH WITH PROD. EQUIP.
PREPARING TO P0H WITH PRODUCTION EQUIPMENT AT REPORT TIME.
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C 3.00
R.EA24ING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH 2.50
TESTING BOP /WH 4.50
RUNNING CASING
C~ING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN 14.00
WAIT ON WEATHER/MAT
EVALUATION
CORING
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
.4A/~E PLATFORM "A"
~D MIDDLE GROUND SHOAL
SE PLATFORM "A"
~ELL A34-11LS
WORK ORDER 731400
SIDETRACK
_DRILLING FOP, EM/tN: SELTZ R H
PROG. DEPTH 11599
PRESENT DEPTH
FOOTAGE DRILLED
, .
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 10325
WATER DEPTH 80
/GAi/X)WAY DR
PRESENT ACTIVITY: RIH WITH KUT-RITE SHOE
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
.50 CHECK FOR FLOW AND FILL TRIP TANK. ..
6.00 POH LAYING DOWN ALL PRODUCTION EQUIPMENT.
1.00
2.50
1.00
4.50
ELEVAT. KB TO MSL 116.0 DATE 06/26/95
DIST. KB TO BHF 38.4 DAY 4
NLTA LTH/YTD / EST. DAY 36
LTA LTH/YTD /... DAYS +/-
DAYS SINCE LAST LTA 811
LAST BOP TEST 06/24/95 LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PP1% KILL SPEED 450 ~ 50
PP2 · KILL SPEED ·
L .
DRAIN STACK AND CHANGE OUT 2 7/8 PIPE RAMS TO 3.5".
MA3~E UP TEST JT, SET PLUG~ AND TEST 3.5 PIPE RAM~ AND BLIND RAMS FROM
250 - 5000# PSI. SET WEAR RING. L/D TEST JT AND PLUG.
M/U TEST B.HA WITH ~LOAT SUB. , ..,
RIH WIT/4 BHA ON 3.5 DRILLPIPE.
1.00 TAG PKR TOP AT 7407' (BY DP MEASUREMENT). STING INTO SEAL ASSEMBLY OF
PACKER DOWN TO 7418'. CLOSED BAG AND PSI TESTED CSG ANNULUS TO 2200#.
LOST 100# IN FI~-E MINUTES.
1.50 POH WITH 1 STD. R/U CIRCULATING LINE AND CIRCUI2%TED HOLE WHILE REPAIR
LEAKING TOP DRIVE SWIVEL PACKING.
.50 ENGAGED PACKER AND PSI TESTED CASING A1TNULUS TO 2200#.
2.00 POH WITH BHA.
1.00 L/D SEAL ASSEMBLY AND M/U MILLING ASSEMBLY.
2.50 RIH WITH MILLING ASSEMBLY AT REPORT TIME. PREPARING TO MILL OVER
PRODUCTION PACKER.
TIME (HRS)
CUM. ROT. HRS
ROTATING
MIIDMOTOR
TRIPPING 15.00
C & C 1.50
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN IsOPIW~ 1.0o
TESTING BOP /WH 2.50
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 2.00
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 2.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE I OF I
RIG NA~iE PLATFORM "A" PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE
~RLD MIDDLE GROUND SHOAL PRESENT DEPTH DIST. KB TO BHF 38.4 DAY
~E PLATFORM "A" FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY
WELL A~34-11LS SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/-
WORK ORDER 731400 DEP. OF LAST CSG 10325 DAYS SINCE LAST LTA 812
, .
SIDE TRACK __ WATER DEPTH 80 LAST BOP TEST 06/24/95 LAST CSG TEST
/G~WAY DR
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: REVERSE CIRC UP FILL
b~DIMFu~RY OF OPERATIONS (SHOW HOURS FOR EACH'OPERATION)~: ......................
3.50 TAGGED TOP OF FISH AT 7406' BY TBG MEASUREMENTcBROKECIRCULATION WITH
FIW AND MII~LED ON PACKER FROM 7406 - 7408'.
1.00 PUSHED PACKER TO BOTTOM - TOP OF FISH 8027'.
2.50 POH WITH MILL ASSEMBLY.
1.50 L/D MILL ASSEMBLY ~ PICK UP NEW BHA OF SPEAR ASSEMBLY.
3.00 RIH WITH B~Lk.
.50 BREAK CIRCULJ~TION AND ENGAGE FISH AT 8007'. WORKED ON ENGAGING FISH.
3.00 POH SLOWLY WITH ASSEMBLY. RECOVERED NO FISH.
1.00 L/D SPEAR ASSEMBLY AND PICK UP NEW BHA OF MILLING ASSEMBLY.
2.50 RIH WITH BHA TO 7400'.
1.50 CUT AND SLIP 100' OF DRILL LINE. SERVICE TD AND DW.
1.00 C/{ANGE OUT REGULATOR ON #1 GENERATOR.
.50 CONT TO RIH AND TAGGED UP AT 8006'.
2.50 R/U FOR REVERSE CIRCIILATION. WASH DOWN IN FILL FROM 8006 - 8020'.
REVERSE CIRCULATING FILL AT REPORT TIME.
BHA INSPECTION (CUM. ROT HRS)
PP1 % KILL SPEED
PP2 ~ KILL SPEED
06/,27/9s
5
36
TIME (HRS) ....
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING 12.50
C&C 3.0O
REAMING
SURVEYS
REPAIRS 2.50
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 2.50
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
3.so
3.50
450 ~ 50
,EPI ALASKA DAILY DRILLING REPORT
PAGE I OF 1
.~ NAME PLATFORM "A"
,ELD MIDDLE GROUND SHOAL
~E' PLATFORM
WE. A34- I 1LS
WORK ORDER 731400
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE
PRESENT DEPTH DIST. KB TO BHF 38.4 DAY
FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY
SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/-
DEP. OF LAST CSG 10325 DAYS SINCE LAST LTA' 813
WATER DEPTH 80 LAST BOP TEST ~6_~/9~ LAST CSG TEST
_ /GALLOWAY DR BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: CLEANING OUT 7" CASING
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
3.50 CONT TO REVERSE CIRCULATE OFF TOP OF FISH WORKING STINGER DOWN INTO
FISH.
2.50 CHECK FOR FLOW AND POH WITH PACKER MILL ASSEMBLY.
1.00 ~/D_CLEANOUT BHA AND =P/U SPEARING ASSEMBLY.
2.00 RIH WITH SPEAR TO 7961'
.5~ ~/U...T.T~P DRIVE AND BREAK CIRCULATION. WASHED TOP OF FISH BEFORE
ENGAGING FISH. ENGAGED FISH AT 8028~. PULLED 250K TO PULL FISH FREE.
3.00 POH WITH FISHING ASSEMBLY. HAD TROUBLE WORKING FISH THROUGH TOP OF
LINER.
1.50 L/D_BHA AND ~/U~CEME~T MILL~t~G__B~A._.:.
2.50 RIH WITH BHA TO TOP OF LINER AT 6427'.
.50 ~ U/_.~_TOP DRIVE AND CIRCULATED HOLE AT TOP OF LINER.
1.00 RUN INTO THE 7" CASING SLOWLY TO 8027'.
3.50 WASH HOLE FROM 8027-8064~. DRILLED OUT HARD CEMENT FROM 8064~ - 8210'.
PUMPED SWEEP WHILE DRILLING AT 8175' AND 8210~.
.50' CIRCULATED OUT SWEEP FROM 8210'
2.00 DRILLED OUT HARD CEMENT FROM 8210' - 8249'. DRILLING OUT CEMENT AT
REPORT TIME.
SWEPI ALASKA DAILY DRILLING REPORT
PP1 @ KILL SPEED
PP2 @ KILL SPEED
300 @ 30
550 @ 50
TIME (~RS)
CUM. ROT. HRS 9.00
ROTATING 5.50
MUD MOTOR
TRIPPING 11.00
C & C 5.00
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 2.50
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LE' PLATFORM "A"
WE. A34-11LS
WORK ORDER 731400
SIDE TRACK
DRILLING FOREMAN: SELTZ R N
PROG. DEPTH 11599
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 10325
WATER DEPTH 80
_/GALLOWAY DR
ELEVAT. KB TO MSL 116.0 DATE 0_~_~9~
DIST. KB TO BHF 38.4 DAY 7
NLTA LTH/YTD / EST. DAY 36
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 814
LAST BOP TEST ~6_~/9~ LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: POH WITH TESTING PACKER PP1 @ KILL SPEED 300 @ 30
PP2 @ KILL SPEED 550 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.00 DRILLED OUT HARD CEMENT FROM 8249' TO 8338'. PUMPED S.WEEP WHILE TIME__~.~.RS~
DRILLING CEMENT AT 8315~ CUM. ROT. HRS 11.00
2.50 CIRCULATE-SWEEP- OUT OF HOLE. ' ............... ROTATING - · · 2.00
......... .50--~HECK FLOC-AND-PUMP DRY-JOB.- ....................................... MUD-MOTOR
2.50 POH WITH 6" MILL.
1.50 ~/D BHA AND M/U NEW RR BIT BHA.
2.50 RIH WITH BHA.
1.00 ~/U TOP DRIVE AND BREAK CIRCULATION AT 8294'. REAMED DOWN FROM 8294 -
8338'
3.0~ ~U FOR REVERSE CIRCULATION. ATTEMPTED TO REVERSE CIRCULATE
SUCCESS ~BIT KEPT PLUGGING OFF). WENT BACK TO CONVENTIONAL CIRCULATION
MIXED AND PUMPED SWEEP. CIRCULATED HOLE CLEAN.
.5~ PICKED UP 30' OFF BOTTOM AND SD FOR 30 MIN. RIH AND TAGGED UP AT 8338.
3.00 POH WITH BHA AND L/D BHA.
2.50 ~/1J. HOWCO CHAMP TESTING PACKER AND RIH ON 3.5 DP.
.50 SET PACKER AT 7325' AND TESTED CASING ANNULUS TO 2200# - TESTED OK.
2.00 CHECK FLOg AND BEGAN TO POH WITH TESTING PACKER. POH AT REPORT TIME.
TRIPPING 12.50
C & C 7.0O
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 1.50
RIG UP/TEAR DOWN
gAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 1.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF I
G NAME PLATFORM "A"
IELm MIDDLE GROUND SHOAL
;E~ PLATFORM
JELL A34-11LS
JORK ORDER 731400
SIDE TRACK
)HILLING FOREMAN: SELTZ R H
PROG. DEPTH 11599
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 10325
WATER DEPTH 80
~_/GALLO~AY DR
~RESENT ACTIVITY: PREP TO RIH ~ITH gHIPSTOCK
~UNMARY OF OPERATIONS (SHO~ HOURS FOR EACH OPERATION) :
2.00 CONT. TO POH NITH TESTING PACKER THIS AM.
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 38.4 DAY 8
NLTA LTH/YTD ___/ . _ EST. DAY ~'~
LTA LTH/YTD . . /~ DAYS +/-
DAYS SINCE LAST LTA 815
LAST BOP TEST ~/9~ LAST CSG TEST
BHA INSPECTION CCUM. ROT HRS)
PP1 a KILL SPEED
PP2 a KILL SPEED
.50 ~ U/_..~._~I~STOCK ASSEMBLY. WHILE PULLING BACK OUT OF BOP STACK TO REMOVE
SAFETY ON PLUNGER UHIPSTOCK RUNG UP I~TAC~. S~[ARING~B~LT._.__._~BETW_..~EEN._.~___
PILOT MILL AND WHIPSTOCK. THIS RESULTED IN ~HIPSTOC[ BEING DROPPED.
1.00 L_./D UHIPSTOCK ASSEMBLY AND P/U DIE COL. ASSEMBLY.
3.00 RIH UITH FISHING ASSEMBLY. NORKED SLONLY THROUGH TOP OF LINER.
.50 M/U TOP DRIVE AND BREAK REVERSE CIRCULATION. TAG AND WORK OVER TOP
OF FISH AT 8310~
4.50 POH VERY SLONLY NITH FISH. RECOVERED MAJOR BODY OF NHIPSTOCK. LEFT
TIME .[.~. R S.). __
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAM I NG
SURVEYS
JET · -
TRAVELIN~_SLIP. 1' PUSH ROD~ AND 1" X 1" X I~ ANGLE IRON IN HOLE.
3.00 ~ FISH. M~=STRING MILL ASSEMBLY ~ITH MODIFIED JUNK BASKET.
3.00 RIH gITH FISHING ASSEMBLY TO 6422~.
.50 ~U TOP DRIVE AND BREAK REVERSE CIRCULATION. DRESS OFF 7" LINER TOP
AT 6427~.
1.50 CONT. TO RIH WITH FISHING ASSEMBLY.
.50 TAG TOP OF FILL AT 8325'. BREAK REVERSE CIRCULATION AND WASH DOgN TO
TD OF 8338'.
1.00 REVERSE CIRCULATE HOLE CLEAN.
2.50 CHECK FLOW AND POH NITH FISHING ASSEMBLY.
.50 L/D BHA AND FISH. RECOVERED FISH - DID NOT RECOVER ANGLE IRON.
PREP TO RIH WITH REDRESSED WHIPSTOCK AT REPORT TIME.
REPAIRS
FISHING
NIP UP/DOgN /BOP/WH
TESTING BOP
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
12.00
I .00
'16.50
1.50
5.00
SF_.P 1 8 1995
Alaska Oil & (]as Cons.
Anchorage
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 2
RIG NAME PLATFORM
D MIDDLE GROUND SHOAL
L~SE PLATFORM "A"
WELL A34-11LS
WORK ORDER 731400
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PROG. DEPTH 11599
PRESENT DEPTH
FOOTAGE DRILr.k~D
SIZE OF I2tS'T CSG 7.000
DEP. OF LAST CSG 10325
WATER DEPTH 80
/GALLOWAY DR
PRESENT ACTIVITY: REAMING CASING TO WINDOW
ELEVAT. KB TO MSL 116.0 DATE 0,7/01/95
DIST. KB TO BHF 38.4 DAY 9
NLTA LTH/YTD / EST. DAY 3--6
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 816
LAST BOP TEST 06/24/95 LAST CSG TEST 06~29/95 BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED O
PP2 · KILL SPEED O
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.50 M.~U WHIPSTOCK BHA - SURFACE ORIENT WHIPSTOCK. P/U MWD AND SURFACE
3.00
1.00
1.00
4.50
.50
1.00
3.50
' 00
0
1.00
2.00
MWDWOULDNOT SURFACE TEST. SCALE FROM SURFACE LINES HAD PLUGGED TOOL.
RETRIEVED TOOL AND REVERSE CIRCULATED. ATTEMPTED 2ND SURFACE TEST.
MWD PLUGGED 2ND TIME. REVERSED CIRCULATED CLEAN. CONVENTIONALLY CIRC.
SWEEP TO CLEAN UP SURFACE LINES AND EQUIPMENT. TEST MWD 3RD TIME -
SURFACE TESTED OK WITH NO PLUGGING.
RIH WITH WHIPSTOCK TO 2183'. M/U TOP DRIVE.
TEST MWD. NOT RECIEVING MWD SIGNAL. REVERSE CIRCULATED OUT DEBRIS.
TEST MWDAFTER CIRCULATING - TESTED OK.
RIH WITH WHIPSTOCK TO TOL AT 6427'. DID NOT SEE TOL WITH WHIPSTOCK~
HOWEVER STARTER MILL SLIGHTLY HUNG ON LI1TER TOP. ROTATED SLIGHTLY TO
START MILL INTO LINER. CONT. TO RIH TO BOTTOM.
ORIENT WHIPSTOCK WITH MWD TO 340 DEGREES AND SET WITH BOTTOM OF
WHIPSTOCK AT 8338' WITH 6K COMPRESSION. TOOK 12K TO SHEAR MILL OFF
WHIPSTOCK LUG.
BEGIN MILLING WITH STARTER MILL AT 8318' TO 8320'.
C/~ECK FLOW AND POH WITH STARTER MILL.
L/D STARTER MILL AND PICK UP WINDOW MILL BHA.
RIH TO TOL.
CUT AND SLIP 100' DRILL LINE.
M/U TOP DRIVE A/TD OBTAIN TORQUE READINGS AS FOLLOWS:
TIME (HRS)
CUM. ROT. HRS 13.00
ROTAT I NG 1.00
MUD MOTOR
TRIPPING 11 . 00
C&C
REAMING 1.00
SURVEYS 1.50
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNNING CASING
CEM]~T~ING
PICKUP/LAY DOWN DS
INSPECT BHA 3.50
RIG UP/TEAR DOWN
WAIT ON WEAThER/MAT
EVALUAT I ON
CORING
OTHERS 6.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A" PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE 07/0,2/95
D MIDDLE GROUND SHOAL PRESENT DEPTH DIST. KB TO BHF 38.4 DAY 10
].~-.~E PLATFORM "A" FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 36
..
WELL A34-11LS SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/-
WORK ORDER 731400 DEP. OF LAST CSG 10325 DAYS SINCE LAST LTA 817
SIDE TRACK WATER DEPTH 80 LAST BOP TEST 06/24/95 LAST CSG TEST 06/29/95
DRILLING FOREI~%/q: SELTZ R H /GALLOWAY DR BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: DISPLACING AAq~IILUS W/ DRILL MUD P~I ~ KILL SPEED 30 ~ 20.__90
PP2 ~ KILL SPEED 50 ~ 500
SUMMARY OF OPERATIONS (SHOW HOURS FO~"EACH~PERATION) :
2.00 REAM OUT CASING FROM 7391' - 8319'. .......................... ~ ............ TIME (HRS)
7.00 MILL WINDOW IN 7" CASING FROM 8319' - 8326'. CUM. ROT. HRS 24.50
3.50 CHECK FLOW AND POH WITH MILL.
2.50 L/D WINDOW MILL AND M/U 2ND WINDOW MILL ASSEMBLY.
2.50 RIH WIT}{ MILLING BHA TO 8298'.
.50 M/U T,OP DRIVE - BP.F.A]( CIRCULATION.
4.50 MILL OUT WINDOW FROM 8318' TO 8339'.
1.50 DISPLACE FIW FROM CASING AN1N-0'LUS WIT}{ 9.0# WATER BASED MUD.
DISPLACING A1TNULUS AT REPORT TIME.
NOTE: .FROM THE LOOKS OF THE MILLSf MILLING TIMEr AND WAY CASING
MILLED~ IT APPF2%RS WE MAY HAVE CUT THROUGH A COLLAR TOWARD THE BOTTOM
OF THE WINDOW. WINDOW APPEARS TO BE SMOOTH AND IN GOOD SHAPE. NO
PROBLEMS ARE ANTICIPATED WI/q{ WINDOW AT THIS TIME.
ROTATING 11.50
MUD MOTOR
TRIPPING 6.0O
C & C 2.00
REAMING 2.0O
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WN
RUNNING CASING
CEMF_/TTING
PICKUP/LAY DOWN DS
INSPECT BHA 2.50
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 2 OF 2
WORK ORDER 731400
A34-11LS SIDE TRACK
SUMMARY OF
OPERATIONS CONTINUE --
6602' - 50 RPMS~275 AMPS~ NO EXCESSIVE TORQUE
6695' - NO EXCESSIVE TORQUE (275-300#)
6788' - NO EXCESSIVE TORQUE
6819' - EXCESSIVE TORQUE - REAMED 30' SECTION - TORQUE OK.
6881' - NO EXCESSIVE TORQUE
6974' - NO EXCESSIVE TORQUE
7067' - EXCESSIVE TORQUE - REAMED 90' SECTION - TORQUE OK.
7157' - 7391' - NO EXCESSIVE TORQUE
7391' - EXCESSIVE TORQUE - BEGAN TO REAM TO WINDOW.
1.00 BEGAN TO REAM CASING AT 7391' - REAMING TO WINDOW AT REPORT TIME.
NOTE : WELL FLOWING WATER AT A RATE OF 1 BPH.
SWEPI ~ASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A" PROS. DEPTH 11599
D MIDDLE GROUND SHOAL PRESENT DEP/"A 8432
*.. ~E PLATFORM "A" FOOTAGE DRILLED 93
WELL A34-11LS SIZE OF LAST CSG 7.000
WOR~K ORDER 731400 DEP. OF LAST CSG 10325
SIDETRACK WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE 07/03/95
DIST. KB TO BHF 38.4 DAY 11
NLTA LTH/YTD / EST. DAY 36
LTA LTH/YTD .,/ DAYS +/-
DAYS SINCE LAST LTA 818
..,
U~ST BOP TEST 07/02/95 LAST CSG T~ST 06/29/95
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: ROTARY DRILLING
/Gi~LLOWAY DR
~Y OF OPERI%TIONS (SHOW HOURS FOR EACH OPERATION) :
2.00 CONT TO DISPLACE ANNULUS WIT}{ 9.0# WATER BASED MUD.
2.00 POH WITH BHA.
.50 L/D BHA.
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED
PP2 · KILL SPEED
5.50 PERFORM'SUCCESSFUL WEEKLY BOP TESTS. BLAIR WANDZELL OF AOGCC NOTIFIED
AND DECLINL:q) TO WITNESS.
2.00 M/U BHA. SIIRFACE TESTED MWD.
3.00 RIH WITH BHA. C/4ECKED MWD AT 4200'. FIr_J,R~D DP AT TOW.
1.00 ORIENT BIT TOOL FACE OFF WHIPSTOCK.
.50 ROTARY DRILL FROM 8340 - 8350'.
7.50 MOTOR/ROTARY DRILL FROM 8350' TO 8432'.
SWEPI AI2%SKA DAILY DRILLING REPORT
ROTARY DRILLING AT REPORT TIME.
750 ~ 30
1100 e 50
TIME (HRS)
CUM. ROT. HRS 32.00
ROTATING 3.50
MUD MOTOR 4.00
TRIPPING 5.0O
C & C 2.0O
RF2%MING
SURVEYS 1.50
REPAIRS
FISHING
NIP UP/DOWN /BOP/W~
TESTING BOP /WH 5.50
RUNNING CASING
CEMF_~NTING
PICKUP/LAY DOWN DS
INSPECT BHA 2.50
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
PAGE 1 OF 1
RIG NAME PLATFORM
D MIDDLE GROUND SHOAL
. ~E PLATFORM "A"
WELL A34-11LS
WORK ORDER 731400
SIDE TRACK
PROS. DEPTH 11599
PRESENT DEPTH 8779
FOOTAGE DRILLED 347
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 10325
WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE 07~04/95
DIST. KB TO BHF 38.4 DAY 12
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/- +4.0
DAYS SINCE LAST LTA 819
LAST BOP TEST 07/02/95 LAST CSG TEST 06/29/95
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: TRIPPING FOR BIT '
/GALLOWAY DR
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
23.50
MOTOR/ROTARY.DRILL FROM 8432' TO 8779'
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED
PP2'~ KILL SPEED
650 e 30
1000 ~ 50
TIME (}{RS)
.50 CIRC. - SURVEY - PUMP PILL
WELL FLOWING = GAINING APPROX. 2 BBL/HR WHILE DRILLING
NOTE~
CUM. ROT. HRS
ROTAT I NG
MUD MOTOR
TRIPPING
C& C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/W}{
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUAT I ON
CORING
53.00
9.50
11.50
.50
2.50
SWEPI A~KA DALLY DRILLING REPORT
PAGE 1 OF 1
WTG NAME PLATFORM "A" PROG. DEPTH 11599
LD MIDDLE GROUND SHOAL PRESENT DEPTH 8986
].~E PLATFORM "A" FOOTAGE DRIrJ.k'rD 207
WELL A34-11LS SIZE OF ~ CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 10325
SIDE TRACK WATER DEPTH 80
DRILLING FOREMAN: WELLS R V /
ELEVAT. KB TO MSL 116.0 DATE 07/05/95
DIST. KB TO BHF 38.4 DaY 13
NLTA LTH/YTD / EST. DAY _50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 820
X~ST BOP TEST 07/02/95 X~T CSG TEST 96/29/95
BKA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: ALTERNATLY SLIDING/ROTARY DRLG
SU~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
7.50 TRIP F/NEW BIT AT 8779'.
16.50 ALTERIqATLY SnIDE/ROTARY DRILL W/MOTOR F/~V79'.T/8986~ W/BIT #2.
BIT #1 CON'D: 5-8-BT-H-F-1-ER-HRS
PP1 · KILL SPEED 660 ~ 30
PP2 ~ KILL SPEED 1050 e 50
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C&C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WI{
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
68.50
3 .S0
12.00
7.50
1.00
SWEPI A/_JkSKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG ~ PLATFORM "A'
'~ MIDDLE GROUND SHOAL
SE PLATFORM
~rELL A34-11LS
WORK ORDER 731400
PROG. DEPTH 11599
PRESENT DEPTH 9057
FOOTAGE DRILLED 71
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 10325
SIDE TRACK WATER DEPTH 80
DRILLING FOR~: WELLS R V /
PRESENT ACTIVITY: CIRC OUT HI-VIS SWEEP
ELEVAT. KB TO MSL 116.0 DATE 07/06/95
DIST. KB TO BHF 38.4 DAY 14
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 821
LAST BOP TEST 07/02~95 LAST CSG TEST 06/29/99
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED 660 ~ 30
PP2'~ KILL SPEED 1050 ~ 50
_
SUMMARY-OF-OPERATIONS (SHOW HOURS FOR_EACH OPERATION)
..... 1-;00--MOTOR DRILLING-W/BIT #2 F/8986, T/9001_' .
3.50 PUMP PILL, .POH, STAND BHA BACK IN DERRICK.
1.50
4.00
.5O
PICKED UP 21 JTS 3 1/2" DP, .FLUSHE~. CLEAN, RACK BACK IN DERRICK.
MAKE UP NEW BIT #3, TIg T/8850'
WASH/RF_JkM 8850' T/9001'
4.50 ORIENT, DRILL W~MOTOR W/BIT #3 F/9901' T/9057' PICKED UP TO REORIENT
AND BECAME BIT STUCK AT 9057'.
8.00 MOBLIZE DIA-LOG/WEATHERFORD WHILE WORK STUCK BIT~ ABLE TO CIRC AND
ROTATE~ BIT STUCK ONLY IN SUSPECT "HR" COAL. RIGGED DIA-LOG AND REMOVE
MWD. SPOT HI-VIS PILLf 10 BBLS OUTSIDE AND KEPT 20 BBLS INSIDE. JAR ON
BIT, ALT~.RNATLEY ROTATING TO BREAK UP COAL AROUND THE BIT. AFTER AN
HOUR AND A HALF BEGAN PUMPING HI-VIS SWEEP WHILE CONTINUING TO WORK
STRING...BIT BEGAN TURINING~ FOUND A 3 TO 4 FOOT INTERVAL WE COULD
ROTATEf CIRC AND MOTOR THE BIT TOO...KEPT AT IT GENTLY WORKING UP TILL
1.00 FINISHING PUMPING OUT HI-VIS SWEEP AT RE.D(gRT~ .W .
TIME (HRS)
'CUM. ROT'. HR~ · '74.00
ROTATING
MUD MOTOR 5.50
TRIPPING 9.00
C & C 1.00
REAMING .50
SURVEYS
JET
REPAIRS
FISHING 8.00
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT __
EVALUATION
CORING
SWEPI A ~KA DAILY DRILLING REPORT
RIG NAME PLATFORM "A" PROG. DEPTH 11599
qLD MIDDLE GROUND SHOAL PRESENT DEPTH 9071
~E PLATFORM "A" FOOTAGE DRILLED 14
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 10325
SIDE TRACK WATER DEPTH 80
DRILLING FORE1MAR: .WELLS R V /
PRESENT ACTIVITY: TIH W/NEW BIT ON MOTOR ASSMY
PAGE i OF 1
ELEVAT. KB TO MSL 116.0 DATE 07/07/95
DIST. KB TO BHF 38.4 DAY 15
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 822
~ ~oP ~_~ 07/02/95 ~ST CSt TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED 560 ~ 30
PP2 · KILL SPEED 840 * 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
4.00 FINISlqED CIRC OUT SWEEPl DRILL 14' HARD FORMATION~ PUMP ANOTHER SWEEP.
7.50 PUMP PILLi POH. LAYED DOWN MOTORAND CHANGED OUT JARS. STOOD BACK THE
MONEL FLEX .COLI2%RS~ MADE UP BIT, BS¢ STABf 1 STEEL DCf ST. ABf 2 STEEL
DC'Sf NEW JA~S., 30 JTS HWDP AND TIH T/8335'.
WASH/REAM OUT MOTOR RUN F/8335'.T/9071'..
PUMP HI-VIS SWEEP TO CLEAN HOLE AFTER REAMING JOB. MUCH SAND.
3.50
3.50
5.50 PUMP PILL~ POH. LAY]KD DOWN BSf STABS. STOOD BACK 3-4 3/4" STEEL DC'S.
MADE UP NEW BIT ON MOTOR~ TIH AT RPT TIME.
SWEPI ALASKA DAILY DRILLING REPORT
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C&C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN
TESTING SOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
75.50
1.50
13.00
6.00
3.50
PAGE 1 OF i
RT~ NAME PLATFORM "A" PROG. DEPTH
D MIDDLE GROUND SHOAL PRESENT DEPTH
LEASE PLATFORM "A" FOOTAGE DRILLED
WELL A34-11LS SIZE OF LAST CSG
WORK ORDER 731400 DEP. OF LAST CSG
SIDE TP. ACK WATER DEPTH
DRILLING FOREMAN: WELLS R V /
PRESENT ACTIVITY: ORIENTING MOTOR TO DRILL AHEAD
11599 ELEVAT. KB TO MSL 116.0 DATE 07/08/95
9228 DIST. KB TO BHF 38.4 DAY 16
157 NLTA LTH/YTD / EST. DAY 50
7.000 LTA LTH/YTD / DAYS +/-
10325 - DAYS SINCE LAST LTA 823
80 LAST BOP TEST 07/02/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED 720 e 30
PP2 % KILL SPEED 1050 e 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.00 .TIH T/SHOE W/BIT #4 .............................................. TIME (HRS)
..... i: °6--coL-i0o~ Am5 ~sm-~VZCE TOP -bRIVE/~IG
1.00
11.00
9.00
FINISH TIH T/9071' W/BIT #4
ORIENT MOTOR, DRILL F/9O71' T/9228' W/BIT #4. QUIT GETTING TURN.
PUMP PILL~ TRIP F/NEW BIT #5. ORIENTING MOTOR AT RPT TIME.
BIT #2 COND: 3-5-BT-H-E-1-CT-PR/HR
BIT #3 COND: 2-3-NO-A-E-I-SD-HP (NOTE: SD WAS VERY SEVERE)
BIT #4 COND: 4-5-BT-G-E-1-WT-HP (NOTE: HP WAS NOT GETTING ANY TURN)
AOGCC DECLINED TO WITNESS SUNDAYS BOPE TEST. (TO0 MANY FISH IN RIVERS)
ROTATING
MUD MOTOR 11.00
TRIPPING 12.00
C & C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/W}{
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 1.00
SWEPI A.~,,SKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM =A=
D MIDDLE GROUND SHOAL
L~.,~E PLATFORM =A'
WELL A34-11LS
WORK ORDER 731400
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 11599
PRESENT DEPTH 9405
FOOTAGE DRILLED 177
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 10325
WATER DEPTH 80
/.
PRESENT ACTIVITY: PREP T/DO WEEKLY BOPE TEST
ELEVAT. KB TO MSL 116.0 DATE 07/09/95
DIST. KB TO BHF 38.4 DAY 17
NLTA L/H/Ir'rD /__ EST. DAY 5___q0
LTA L~/YTD / DAYS +/-
DAYS SINCE LAST LTA 824
LAST BOP TEST 03/02/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1% KILL SPEED 680 ~ 30
PP2 · KILL SPEED 1000 ~ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
16.50 MOTOR DRILL F/9228' T/9405' W/BIT #5
4.00 WORK TIGH SPOT~ REAM OUT AND PUMP HI-VIS SWEEP. LARGE PIECES OF SAND
IN SWEEP.
CHECK FLOW, NONE! POH W/BIT #5 F/NEW BIT AND 1 3/4 DEG MOTOR. PREP TO
TEST BOPE AT RPT TIME.
BIT #5 COND: 1-2-WT-A-E-I-NO-HP
3.50
_ _
_
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
~ING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
103.00
16.50
3.5O
3.00
1.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF i
RIG NAME PLATFORM "A" PROG. DEPTH 11599
) MIDDLE GROUND SHOAL PRESENT DEPTH 9477
L,~,~E PLATFORM "A" FOOTAGE DRILLED 72
WELL A34-11LS SIZE .OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 10325
SIDE TRACK WATER DEPTH 80
DRILLING FOREMAN: WELLS R V /
PRESENT ACTIVITY: CIRC/COND F/LOGS
ELEVAT. KB TO MSL 116.0 DATE 07/10/95
DIST. KB TO BHF 38.4 DAY 18
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 825
LAST BOP TEST 07/09/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED 660 ~ 30
PP2'~ KILL SPEED 1000 ~ 50
--DID WEEKLY_ BOPE TEST_ OK
-SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATIONI.
TIME (HRS)
MAKE UP NEW.BIT ON NEW MOTOR AND TIH T/9405'.
MO/OR DRILL F/9405' T/9477' W/BIT #6.
CIRC/COND F/SHORT TRIP PRIOR T/LOGGING.
SHORT TRIP T/WINDOW, HOLE IN GOOD COND.
CIRC/COND F/LOGS AT RPT TIME.
5.50
8.00
3.50
1.50
.50
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C&C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
111.00
8.00
7.00
4.00
5.00
SWEPI AL.~KADAILY DRILLING REPORT
PAGE 1 OF 1
R~ NAME PLATFORM "A"
; MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
..WELL A34-11LS
:.WORK ORDER 731400
SIDE TRACK
:DRILLING FOREMAN: ..WELLS R V
PROG. DEPTH 11599
PRESENT DEPTH 9480
FOOTAGE DRILLED
SIZE OF LAST CS(] 7.000
DEP. OF LAST CSG 10325
WATER DEPTH 80
/
ELEVAT. KB TO MSL 116.0 DATE 07/11/95
DIST. KB TO BHF 38.4 DAY 19
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 826
..
LAST BOP TEST 0~/09/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS]
ACTIVITY: CIRC/COND F/LINER
PPl % KILL SPEED 550 ~ 30
PP2 ~ KILL SPEED 740 ~ 50
-SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.5o cIRc/co~ F/Lo~S
5.00 POHr (SLM CAME OUT 3' DEEPER) LAY DOWN MWD/MOTOR ASSMY.
4- .
9.00 RIG UP SWS, LOG RUN .#1:AMS/TCCB/SGTL/LDTD/#I-2 FLEX/DITE. RUN #2 SAME
T"fPEr DIFFERENT TOOLS. LOGGERS TO WAS 9458'~ DRILLERS SLM 9480'. LOGS
DID NOT GET COMPLETLY TO BOTTOM. TEAR OUT LOGGERS.
4.50
1.00
1.50
MAKE UP CLEAN OUT ROTARY ASSMY ON BIT #5RR~ TIH T/9057'.
REAM OUT MOTOR RUN F/9057' T/9480'. NO PROBLEMS.
CIRC/COND F/SHORT TRIP.
SHORT TRIP T/WINDOW AND BACK T/BOTTOM, NO PROBLEMS.
BIT #6 COND: 2-3-NO-A-E-I-SD-TD (NOTE: SHIRT TAIL DAMAGE WAS BAD! )
1.50
TIME (HRS)
CUM. ROT. HRS 111.00
ROTATING
MUD MOTOR
TRIPPING 11.00
C&C 3.00
REAMING 1.00
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WI{
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT 0NWEATHER/MAT
EVALUATION 9.O0
CORING
SWEPI ALASKA DAILY DRILLING REPORT
;
PAGE 1 OF 1
RIG NAME PLATFORM "A" PROG. DEPTH 11599
~ MIDDLE GROUND SHOAL PRESENT DEPTH 9480
L._.~E PLATFORM "A" FOOTAGE DRILLED
WELL 2%34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 10325
SIDE TRACK WATER DEP/74 80
DRILLING FOREMAN: WELLS R V /
PRESENT ACTIVITY: PULLING 22 STDS TO CIRC DP CLEAN
ELEVAT. KB TO MSL 116.0 DATE 07/12/95
DIST. KB TO BHF 38.4 DAY 20
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 827
LAST BOP TEST 07/09/95 fAST CSG TEST 06/29/95
BHA INSPECTION {CUM. ROT HRS)
PPl· KILL SPED e 30
PP2-~ KILL SPED ~ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
-4'~50 PUMP-HI~vIS--SWEEP, CIRC/COND F/LINER ..................................
8.50 HELD SAFETY MEETING. RIG AND RAN 5" LINER AS DETAILED IN BHA SECTION.
1.50
2.00
CIRC DP VOL AT WINDOW~ RUN ON IN HOLE. TAGGED UP AT 9472'.
DROP BALL, MU CMT HEAD. TEST HOWCO LINES T/5000#. SET HANGER, TOL 8075
CIRC/COND F/C~.
.5O
1.50 PUMPED 40 BBLS FRESH WATER AHEAD OF 64 BBLS GLASS "G" CMT~ WT 15.8 PPG
1.15 CF/SX YIELD. MIS W/.2% CFR-3{ .12 GPS HALAD 344L, .2%HR-5 5.0
GPS FRESH WATER. (310 SX CMT MIXED) DROP DART~ PUMP 5 BBL WATER~ 25 BL
9.5 MUD{ 30 BBL 12.6 MUD 35 BBL 9.5 MUD (12 BBL OVERt DID NOT BUMP UP)
BLED BACK TO HOWCO UNIT~ FLOATS HELD. ROTATED OFF HANGER OK. PULLED
OUT OF TIE BACK{ SLIGHT SUCK ON DP. PULLING PIPE AT RPT TIME.
NOTE: ALL LINER IS 5" 18#{ P-ll0{ STL CONNS. R-2 AND R-3.
- - -TI~E '(HRS) .........
....... CUM? KOT.--HRS ....
ROTATING
MUD MOTOR
TRIPPING 6.00
C & C 7.OO
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING 9.50
CEMENTING 1.50
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
111-~'00
SWEPI k ~KA DAILY DRILLING REPORT
PAGE 1 OF 1
RT~- NAM~ PLATFORM "A" PROG. DEPTH 11599
) MIDDLE GROUND SHOAL PRESENT DEP/q4 9473
LEASE PLATFORM "A" FOOTAGE DRILr~D
, ,
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 10325
SIDE TRACK WATER DEPTH 80
DRILLING FOREMAN: WELLS R V /
PRESENT ACTIVITY: POH W/CE~CEITE CLEAN OUT ASSMY
ELEVAT. KB TO MSL 116.0 DATE 07/13/95
DIST. KB TO BHF 38.4 DAY 21
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 828
LAST BOP TEST 07/09/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED 250 ~ 30
PP2 % KILL SPEED 580 ~ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
.50 FINISH PULLING UP T/6000'.
1.00 CIRC CONVENTIONAL AT 7 BBLS MIN TO CLF2%N INSIDE OF DP OF CST RINGS.
CHECK F/FLOW~ HAD SLIGHT FLOW. SHUT WELL IN W/400 PSI ON IT. OVER THE
2.5 HRS SHUT IN TIME IT BLED DOWN T/180 PSI. CHECK FLOWf NONE.
POHf LAY DOWN BAKER RUNNING TOOL.
2.50
3.50
3.00
7.00
1.50
.S0
MU 6" BIT ON 6-4 3/4" DC'S{ TIH. TAGGED CMT TOP AT 6832'.
DRILL OUT CST F/6832' T/8077'~ TOP OF LINER. LAST 157' WAS FIRM CMT.
CIRC WELL ~.RAR OF C~T CUTTINGS. CHECK F/FLOWr NONE.
TEST CSG T/2200 ~/10 MINS, LOST 200 PSI.
CI-IECK F/FLOW HAD FLOW~ BROKE OFF TOP DRIVE T/WATCH BOT}.I SIDES~ HAD 2.5
TO 3.0 BBL/HR FLOW OUT ANULUS.
1.00
1.50 CIRC BOTTOMS UPt HAD GAS SMELLf SLIGHT OIL STRINGERS OFF BOTTOM.
2.00 CHECK FLOWr HAD 2.5 BBL/MIN. PUMP PILL POH AT RPT TIME
NOTE: WHILE DRILLING OUT CEMENT{ DISPLACED MUD W/RAW SEAWATER.
SWEPI ALASKA DAILY DRILLING REPORT
TIME (HRS)
CUM. ROT. HRS 118.00
ROTATING 7.00
MUD MOTOR
TRIPPING 10 . 50
C & C 2.50
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH .50
RUNNING CA~ ING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 3.50
PAGE 1 OF 1
RIG NAME PLATFORM "A" PROG. DEPTH 11599
D MIDDLE GROUND SHOAL PRESENT DEPTH 9480
. JE PLATFORM "A" FOOTAGE DRILLED
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 10325
SIDE TRACK WATER DEPTH 80
DRILLING FO~: WE~ R V /
PRESENT ACTIVITY: POH W/5" LINER CLEANOUTASSMY
..
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
-- 6.50- FINISHED POH W/7" LINER CLF_2%N OUT ASSMYr-.STOOD DC'S BACK IN_DER/~ICK
1.00 CDL 100'. -
ELEVAT. KB TO MSL 116.0 DATE 07/14/95
DIST. KB TO BHF 38.4 DAY 22
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 829
LAST BOP TEST q7/09/95 ~ CSG /'EST p6/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 Z KILl., SPEED 440 Z 30
PP2 Z KILL SPEED 1040 Z 50
.50
6.50
TIME (HRS)
................................ CUM_.ROT._HRS~ ...... 124.00_
2.00
TAGGED FILL AT 8055'~ MILL PLUGGEDr UNABLE TO CIRC.
P0H W/PLUGGED MILL ASSMY~ UNPLUGGED MILL AND DC'S~ TIH W/MILL ASSMY.
TAGGED FILL AT 8035' (20' HIGHER THAN BEFORE) WASH OUT FILL{ DRILL
CEMENT STRINGERS T/8217'.
.50 TIH T/LANDING COLLAR AT 9408'. NO CEME1Fr ON TOP OF LDG COLLAR.
3.50
2.00
1.50
MILL OUT LDG CO~ PAN IN HOLE T/FLOAT COLLAR (NO CEMENT) AT 9445'.
MILL OUT FLOAT COLLARf RAN ON IN HOLE T/SHOE AT 9480'~ (NO CEMENT).
CIRC HOLE CLEANt HAD DP DART/WIPER PLUG RUBBER ACROSS SHAKERS.
CHECK F/FLOW~ 2.2 BBLS HOUR. POH W/MILL ASSMY AT RFT TIME.
ROTATING 6.00
MUD MOTOR
TRIPPING 14.50
C & C 2.00
REAMING
REPAIRS
FISHING
NIP UP/DOWN /BOP/W~
TESTING BOP /W~
RUNNING CASING
CEMENTING
PIC~/~Y DO~ DS
INSPECT BHA
RIG UP/TEAR DO~
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 1.50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE i OF I
RIG NAME PLATFORM "A' PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE 07/15/95
'~ MIDDLE GROUND SHOAL PRESENT DEPTH 9480 DIST. KB TO BHF 38.4 DAY 2--3
JE PLATFORM "A" FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 50
WELL A34-11LS SIZE OF LAST CSG 7.000 LTA LTH/YTI) / DAYS +/-
WORK ORDER 731400 DEP. OF LAST CSG 10325 DAYS SINCE LAST LTA 830
SIDE ~7~ACK WATER DEPTH 80 LAST BOP TEST 07/09/95 LAST CSG TEST 06/29/95
DRILLING FOREMAN: WELLS R V ./ BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTMTY: DRESSING OFF TIE BACK SLEEVE PP1 · KILL SPEED 440 e 30
PP2 · KILL SPEED 1040 · 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
6.00 FINISHED POH W/MILL ASSMY. MU SCRAPER ASSMYt TIH TO LINER TOPi 8081'.
2.50 WORKED SCRAPER ACROSS PERFS AND ENTIRE LENGTH OF 7" LINER SEVERAL TIME
2.50 PUMPED HI-V'IS SWEEP.
6.50 POH W/7" SCRAPER ASSMY. MU HOWCO RTTS~ TIH T/8056~ SET PKR. WELL
FLOWED OUT THE DRILL PIPE, NO FLOW UP THE ANULUS. 5" LINER LAP LEAKING
6.50
POH~ LAY DOWN RTTS PACKER. MU BAKER MILL ASSMY~ TIH. START DRESSING
TIE SLEEVE BACK AT RPT TIME.
.. ~cfioral]e
TIME (~ms)
CUM. ROT. HRS 124.00
ROTATING
MUD MOTOR
TRIPPING 18.50
C & C 2.50
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING sop /w~ .5o
RUNNING CASING
CEMENTING
PICKUP/LAYDOWNDS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT__
EVALUATION
COBING
OTHERS 2.50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE I OF i
RIG NAME PLATFORM "A" PROG. DEPTH 11599
D MIDDLE GROUND SHOAL PRESENT DEPTH 9480
~._,SE PLATFORM "A" 'FOOTAGE DRILLED '
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 9480
SIDE TRACK WATER DEPTH 80
DRILLING FOREMAN: WELLS R V /
PRESENT ACTIVITY: POH W/LINER TOP PACKER
--~UMMARY OF OPERATIONS (SHOW HOURS FOR-EACH OPERATION~
NOTE CORRECTED "LAST CASING DEPTH".
ELEVAT. KB TO MSL 116.0 DATE 07/16/95
DIST. KB TO BHF 38.4 DAY 24
NLTA LTH/YTD / EST. DaY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 831
LAST BOP TEST 07/09/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HR, S)
PP1 ~ KILL SPEED % 30
PP2 · KILL SPEED % 50
............. TIME -(HRS) ....................
CUM. ROT. HRS 124.00
2.50 FINISH DRESSING TOL~ CIRC HI-VIS SWEEP AROUND.
6.50 POH W/FLIIi~ED MILL AND DRESS-OFF STAB. MAKE UP PACKER AND TIH T/8081'.
1.00 ATTEMPT TO GET SEAL ASSMY INTO LINER TOP AT 8081'~ NO SUCCESS.
5.50 POH W/PACKER. DAMAGE TO PACKER BELOW THE SEALS INDICATED /"HE LINER TOP
NEEDS TO BE DRESSED OFF MORE. TIH W/FLUTED MILL AND DRESS-OFF STAB.
.50 MILL ON LINER TOP AT 8081' TO DRESS IT OFF.
6.00
.5O
POH W/MILL ASS]'~Z'r ~ PACKER~ TIH T/8081'.
SAME AS ABOVEt UNABLE TO WORK INTO TOP OF LINER AT 8081'.
POH W/PACKER AT RPT TIME. ORDERED OUT A TAPERED MILL F/TOWN.
TODAYS LOW COb'/' IS DUE TO RECEIVING INVOICES REFLECTING DISCOUNTS THAT
WERE NOT ON THE "INPUTED" FIELD DROP TICKET.
1.50
RO TAT I NG
MUD MOTOR
TRIPPING
C&C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT __
EVALUAT I ON
CORING
19.50
2.5O
SWEPI _ ~SKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
'~D MIDDLE GROUND SHOAL
~..,~S E PLATFORM "A"
WELL A34-11LS
WORK ODER 731400
SIDE TRACK
DRILLING FOREMAN: WELLS R V /,
PRESENT ACTIVITY: WAITING ON MILL/PACKER
PROG. DEPTH 11599
PRESENT DEPTH 9480
'FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 9480
WATER DEPTH 80
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
4.50 FINISKED POH W/PACKER. MU TAPERED MILL AND TIH T/6385'.
1.50 CDL 100'~ SEI~VICE RIG.
.50 FINISH TIH T/8081' W/TAPERED MILL.
.50 DRESS TOP OF TIE BACK AT 8081'.
5.50
ELEVAT. KB TO MSL 116.0 DATE 07/17/95
DIST. KB TO BHF 38.4 DAY 25
NLTA LTH/YTD / EST. DAY 50
LTA LT~/YTD / DAYS +/-
DAYS SINCE LAST LTA 832
mir hop TEST 07/17/95 mU~T CSG TEST 06/29/95
1.50
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED · 30
..
PP2 · KILL SPEED · 50
POH W/TAPERED MILL ASSMY. MU LINER TOP PACKER, TIH T/8081'.
STAB SEALS INTO TIE BACK~ PRESSURE UP T/400 PSI~ ~[ELD OK. BLED OFF PSI
DROP I 3/4" KIRKSITE BALLr WAIT 30 MINS T/FALLT/PACKER. PRESSURED UP
3000 PSI F/5 MINS, BROUGHT PRESSURE ON UP T/3400 AND SR~%RED OUT BALL
AND SEAT. STILL HAD FLOW FROM ANULUS. pULT.FAg~UP TO CONFIRM PACKER SET~
IT HAD NOT SETr FLOW FROM ANULUS STILL 2 BBLS HOUR.
POH W/PACKER. FLEW IT AND TAPERED MILL T/BAKER SHOP FOR REPAIRS. THE
SEALS WERE TORE UP SOME AND THE LOWER SET WAS GONE. PACKER ELEMENT WAS
3.00
IN NEW CONDITION.
4.50 DID WEEKLY BOPE TEST. OK.
2.50 SERVICE/CLEAN ON RIG WHILE WAITING ON THE TAPERED MILL TO RE-DRESS
TIME
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C&C
REAMING
SURVEYS
LINER TOP TIE BACK A TOUCH MORE WHILE THE PACKER IS BEING REBUILT.
AOGCC DECLINED TO WITNESS BOPE TEST.
124.50
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATI ON
CORING
.50
13.50
4.50
2.50
3.00
SWEPI AIASKA DAILY DRILLING REPORT
PAGE I OF I
RIG NAME PLATFORM "A" PROG. DEPTH 11599
D MIDDLE GROUND SHOAL PRESENT DEPTH 9480
L._.~E PLATFORM "A" FOOTAGE DRILLED
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 9480
SIDE TRACK WATER DEPTH 80
...
DRILLING FOREMAN: WELLS R V ~
PRESENT ACTIVITY: EVALUATING CET LOG
~ _
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
ELEVAT. KB TO MSL 116.0 DATE 07/18/95
DIST. KB TO BHF 38.4 DAY 26
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 833
~ST hOP TEST 07/17/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ uLL SPE~D ~ 30
PP2'~ KILL SPEED e 50
2.50 WAITING ON TAPERED MILL. TIME (HRS)
.... CUM~ ROT'-~RS ....... 1'25.oo ........
2~50--~IH W/-TAPERE~---HZLL~/TOL~-~17~ ............
.so DRESS OFF TOL w/S~OOTrrcR TAPEr~-~ ~ILL WHILE ~ITING ON PACKER.
2.00 CIRC AROUND A HI-VIS SWEEP.
7.50 REPLACE BRAKE BLOCKS ON DRAW WORKS WHILE WAITING ON PACKER.
3.00 POH W/TAPERED MILL TO RUN A CET LOG.
3.50 RIG UI~ SWS ~ LO~ CET F/9397' T/TOL 8081'. LOGGERS UNABLE TO GET TO
TI) OF 9480' DUE TO TORE OFF SEALS IN TR~ HOLE FROM THE PACKER'S SEAL
ASSMY. RECOVERED A PIECE OF A SEAL WRAPPED AROUND THE CET TOOL. WE
HAD LOST ONE COMPLETE SET OF SEALS OFF OF THE PACKER WHEN IT WAS
PULLED FROM THE HOLE.
2.50 EVALUATING CET.
ROTATING .50
MUD MOTOR
TRIPPING 5.50
C& C 2.00
REAMING
SURVEYS
REPAIRS
FISHING
N~P UP/DOWN /BOP/W~
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BNA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT 10.00
EVALUAT I ON 6.00
CORING
:-RIG NAME PLATFORM "A" PROG. DEF~_
'/) MIDDLE GROUND SHOAL PRESENT DEPTH
3E PLATFORM "A' FOOTAGE DRI~,r~
-~LL A34-11LS SIZE OF LAST CSG
~ORK ORDER 731400 DEP. OF LAST CSG
~$IDE TRACK WATER DEPTH
~DRILLING FOREMAN: WELLS R V /.
~KESENT ACTIVITY: TI}{ W/MILL TO DRILL SHOE
SWEPI ..AJ~S__KADAILY DRILLING REPORT
11599 ELEVAT. KB TO MSL
9480 DIST. K~ TO BHF
7.000
9480
80
~~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
.5O EVALUATE CST LOGS.
1.00 RIG DOWN SCHI/]MB~G~.
~:<~12'00
~'_ 3.00
PAGE i OF 1
116.0I ~ATE 07/19/95
38.4 DAY 27
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD . . / . DAYS +/-
DAYS SINCE LAST LTA 834
LA~ BOP TEST 07/17/95 LAL~f CSG TEST 96/29/95
BHA INSPECTION (CUM. ROT HRS)
PPX· KILL SPEED · 30
.
PP2 · KILL SPEED · 50
..
WAIT ON ISOLATION PACKER TO BE REBUILT.(PARTS HAD TO COME FROM
HOUSTON).CLEAN MUD PITS AND RIG WHILE WAITING ON PACKER.
~U BAKER ISOLATION PKRAND RIH
" 2.00 STAB PACKER SEALS INTO TOP OF 5" LINER PRESSURE UP TO 400 PSI TO IN-
SURE SEALS WERE IN.DROP BALL WAIT 40 MINUTES.PRESSURE UP TO 3000 PSI
AND SET PKR.FLOW STOPPED.PRESSURE UP TO 5000 PSI.SHEAR OUT BALL.RETEST
ANNULUS TO 500 PSI. NO COMMUNICATION TO DRILL PIPE.ROTATE OUT OF ISO-
LATION PKR.
~: 2.50 POH .L/D PKR SETTING TOOL.
~:: 3.00 P~U 4 1/8" MILL ASSY. RIH TO DRILL SHOE.
TIME (HRS)
CUM. ROT. HRS 125.00
ROTATING
MUD MOTOR
TRIPPING 8.5O
C&C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNNING C3%S ING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION .50
CORING
O'IT{ERS 15.00
.. -
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
~ PLATFORM "A"
~_.~/~ A34-11LS
WORK ORDEi~ 731400
SIDETRACK
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: TIH W/ DRILLING ASSY.
PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE ~7/20/95
PRESENT DEPTH 9485 DIST. KB TO BHF 38.4 DAY 28
FOOTAGE DRILLED 5 NLTA LTH/YTD / EST. DAY 50
SIZE OF LAST CSG 7.000 LTA LTH/YTD /__ DAYS +/-
DEP. OF LAST CSG 9480 DAYS SINCE LAST LTA 835
WATER DEPTH 80 LAST BOP TEST 07/17/~5 LAST CSG TEST 06/29/95
/, BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED 800 · 30
..
PP2 % KILL SPEED 1300 · 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.50 ~IH W/ 4 1/8" MILL TO DRILL OUT SHOE. I TIME (~RS)
.... 3.00 .TAGGED LANDING COLLAR ~9408' AND FLOAT COLLAR ~9445' REAMED SAME. ] CUM. ROT. HRS 128.00
....... ~DRILL.SHOE AT 9480' AND 5' FORMATION. CHECK FOR FLOWtNO FLOW. ' ........ [ ROTATING ...... 3.00
2.0____~0
PUMP HI-VIS SWEEP 25 BBLS.
.50 DO LEAK OFF TEST TO 9.6 EMW.
3.00 PREPARE PITS FOR DISPLACING W/OIL BASE MUD.
2.50 ATTEMPT TO REVERSE CIRC~PRESSURE TO HIGH, PUMP INTERFACE SWEEP AND
DISPLACE W/ 8.1 PPG OIL BASE MUD.
4.50 CHECK FOR FLOW~OK~ CIRC AND CONDITION~BUILD.VOLUME~PUMP DRY JOB.
3.50 POH F/ DRILLING ASSY.
3.00 MAKE BHA ~5~(USING ROTARY TONGS~MAKE UP,B~REIX)PE~MAKE UP ALL NEW
CONNECTIONS)
.50 TIH W/ BIT #7.
J--MUD-MOTOR ................
TRIPPING
C & C
RF_2tHING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/W}{ __
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT __
EVALUATION
CORING
OTHERS
5.50
9.00
6.50
SWEPI ~SKA DAILY DRILLING REPORT
RIG NAME PLATFORM "A"
D MIDDLE GROUND SHOAL
L._..~E PLATFORM "A"
WELL A]4-11LS
WORK ORDER 731400
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: DRLG W/ BIT #8
PROG. DEPTH 11599
PRESENT DEPTH 9735
FOOTAGE DRIT.T.~ 250
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 9480
WATER DEPTH 80
/
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.50 RIH W/ BIT #7.
S.50
.50
3.50
ROTATE DRLG. W/ BIT #7 F/948S' TO 9585'
SURVEYr CHECK FOR FLOW r PUMP DRY JOB.
POH F/BIT.
1.00 CHANGE BIT AND MWD.(MWD TOOL FACE NOT WORKING)
3.50 SURFACE CHECK MWD~RIH W/BIT #8.
1.00 CUT DRLG LINE AT 5" SHOE~RIH.
6.50 DRLG W/ BIT #8 F/9585' TO 9735',SLIDE FROM 9616' TO 967S'.
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 38.4 DAY
NLTA LTH/YTD __/ EST. DAY
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 836
o7/21/95
29
50
LAST BOP TEST 07/17/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEF..D 1200 · 30
PP2 · ZZLL SPEED 2300 · 50
TIME (HRS)
CUM. ROT. HRS 140.00
ROTATING 9.00
MUD MOTOR 3.00
TRIPPING 9.50
C & C
REAMING
SURVEYS .50
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OT~ERS 2.00
PAGE I OF I
RIG NAME PLATFORM "A" PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE 07/22/95
F D MIDDLE GROUND SHOAL PRESENT DEPTH 9878 DIST. KB TO BHF 38.4 DAY 30
k Z PLATFORM "A" FOOTAGE DRILLR~ 143 NLTA LTH/YTD / EST. DAY 50
WELL A34-11LS SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/-
WORK ORDER 731400 DEP. OF LAST CSG 9480 DAYS SINCE LAST LTA 837
_
SIDE TRACK WATER DEPTH 80 LAST BOP TEST 07/17/95 LAST CSG TEST 06/2%/95
DRILLING FORE~J~N: WELLS R V /. BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: TIH W/ BIT #10 PP1 · KILL SPEED 1150 % 30
PP2 ~ KILL SPEED
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
4.50 CHECK-FOR-FLOW~PUMP PILL~POH F/-BIT~ ....................................... TIME
1-:-00~-CHANGE- BIT~f~IECKMWD.
4.00
7.O0
.50
4.00
1.00
2.00
RIH W/ BIT-#gtFILL PIPE 6025'AND SHOE.
DRLG.W/ BIT #9 F/9735' TO 9878', SLIDE F/9735' TO 9768'.
CHECK F/ FLOWr PUMP PILL.
POH FOR BIT.
CHECK MWD TOOL~CHANGE BITfSURFACE CHECK MWD.
RIH W/ BlT #10.
1800 ~ 40
(HRS) ..........................
~"CUM~. RCY'P.-- HP--..q ....... ].47.00
ROTATING 5.50
MUD MOTOR 1.50
TRIPPING 14.50
C & C .50
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 2.0O
SWEPI ~KA DAILY DRILLING REPORT
RIG NAME PLATFORM "A"
',D MIDDLE GROUND SHOAL
.~E PLATFORM "A'
WELL A34-11LS
WORK ORDER 731400
PROG. DEPTH 11599 ELEVAT. KB TO MSL
PRESENT DEPTH 10095 DIST. KB TO BHF
FOOTAGE DRILLED 217 NLTA LTH/YTD
SIZE OF LAST CSG 7.000 LTA LT~/YTD
DEP. OF LAST CSG 9480 DAYS SINCE LAST LTA
8O
116.0
38.4
/
/
838
SIDE TRACK WATER DEPTH
DRILLING FOREMAN: W~.br~ R V /.
PRESENT ACTIV/TY: DRLG 4 1/8" HOLE W/ BIT ~11
PAGE I OF i
DATE
DAY
EST. DAY
DAYS +/-
07/23/95
31
5O
LAST BOP TEST 07/17/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PPl· KILL SPEED 1300 e 30
PP2 ~ KILL SPEED 2600 ~ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.00 RIH TO SHOE W/ BIT #10rFILL PIPE AT 4200'AND SHOE.
.50 SERVICE TOP DRIVE~DRAWWORKSrAR-3000.
1.00 FINISH RIHrREAM 40' TO BOTTOM.(5'FILL)
7.50 DRLG W/ BIT {10 F/9878'TO 10,020'.SLIDE F/9895' TO 9916'AND 9973' TO
9989'
3.50
CKECK FOR FLOW~PUMP PILL~POH FOR BIT.
CHECK MWD~CHANGE BIT,SURFACE TEST MWD.
RIH W/ BIT ~11rFILL PIPE AT 6025'AND 5" SHOE.
FINISH RIHtREAM 15' TO BOTTOMtSURVEY.
DRLG W/ BIT #11 F/10020' TO 10095'.
1.00
4.50
SWEPI ALASKA DAILY DRILLING REPORT
TIME (HRS)
CUM. ROT. HRS 158.00
ROTATING 9.5O
MUD MOTOR 1.50
TRIPPING 11.50
C&C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DO~ /BOP/WI-I__
%~ING BbP /WH
RUNNING CA~ING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT 0NWEATHER/MAT
EVALUATION
CORING
OTHERS_ 1.50
PAGE i OF i
.5O
3.50
RIG NAME PLATFORM "A" PR(X]. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE 07/24/95
~ MIDDLE GROUND SHOAL PRESENT DEPTH 10380 DIST. KB TO BHF 38.4 DAY 32
I_~..,,SE PLATFORM "A" FOOTAGE DRILL_~D 285 NLTA LTH/YTD / EST. DAY 50
WELL A34-11LS SIZE OF LAST CSG 7.000 LTA LTH/YTD __/ DAYS +/-
WORK ORDER 731400 DEP. OF LAST CSG 9480 DAYS SINCE LAST LTA 839
SIDE TRACK ,,, WATER DEPTH 80 LAST BOP TEST 07/17/95 LAST CSG TEST 06/29/95
DRILLING FOREMAN: WELLS R V / BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: POH F/BIT PP1 e KILL SPEED 1320 ~ 30
-. , PP2 m KILL SPEED 2650 · 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
'--4.50 DRLG W/BIT #11 F/ 10095' TO~10208L;SLIDE F/10144' TO 10176'. ........... TIME (MRS)
..... 4:00--CHECK-FOR FLOWrPUMP PILL~POH-F/~-BIT. - .......
1.00 C~GE BA%~i'ERY PAC~ INMWD~C"~GE BI?~SIIRFACE TESTMWD.
.
3.50 RIX W/ BI? # 12~FILL PIPE AT 5538'~ SHOE.
1.00 CUT DR/X]. LINE.
.50 FINISH RIH~REAM 20'TO BOTTOM.
8.00 DRLG W/ BIT # 12 F/10208' TO 10380'.SLIDE F/10233' TO 10245' AND
10297' TO 10319'.
1.50 CHECK FOR FLOW~ PUMP PILL~POH F/BIT.
-C%]M. ROT.--HR$ ..... 174.00
ROTATING 12.50
MUD MOTOR 3.50
TRIPPING 6.00
C&C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WI{
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 2.00
SWEP1 ~ASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAM~ PLATFORM "A"
'.D MIDDLE GROUND SHOAL
.. .SE PLATFORM "A"
WELL A34- llLS
WOI~K ORDER 731400
SIDE TRACK
DRILLING FOR.EMAN: WELLS R V
PRESENT ACTIVITY: POH F/BIT
PROG. DEPTH 11599
PRESENT DEPTH 10520
FOOTAGE DRIT.T.R'~D 140
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 9480
WATER DEPTH 80
/.
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
3.50 FINTSH POH FOR BIT.
ELEVAT. KB TO MSL 116.0 DATE 07/25/95
DIST. KB TO BHF 38.4 DAY 33
NLTA LTH/YTD / EST. DAY 5--0
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 840
LAST BOP TF..ST 07/24/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED 1500 ~ 30
PP2 · KILL SPEED 2800 · 50
4.50 TEST BOP TO AOGCC RE~TIONS. AOGCC WAIVED WITNESSING TEST.
.S0 M/U BIT # 13~SURFACE TEST MWD.
4.00 RIH W/ BIT #13fFILL PIPE AT 5538'AND 5" SHOE.
8.50 DRIX~ W/ BIT #13 F/10380' TO 10520'.SLIDE F/10486' TO 10509'.
3.00 CHECK F/FLOW, PUMP PILL,P OH F/ BIT.(WILL INSPECT BHA ON THIS TRIP).
PLATFORM "A"
MIDDLE GROUND SHOAL
PLATFORM "A"
WELL A34-11LS
WOP~K ORDER 731400
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: POH WITH BHA
SWEPI ALASKA DAILY DRILLING REPORT
!
TIME (HRS)
RIG NAME
~ E
CUM. ROT. HRS 182.50
ROTATING 7.50
MUD MOTOR 1.00
TRIPPING 10.50
C&C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN IBOPIWH
TESTING BOP /WH 4.50
RUNNING CASING
CEMENTING
PICK'UP/LAY DOWN DS
INSPECT BHA
RIG UP/TEARDOWN
WAIT ON WEATHER/MAT__
EVALUATION
CORING
OTHERS .50
PAGE 1 OF 1
PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE 07/26/95
PRESENT DEPTH 10685 DIST. KB TO BHF 38.4 DAY 34
-FOOTAGE DRILLED ..165 NLTA LTH/YTD / EST. DAY 50
SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/-
DEP. OF LAST CSG 9480 DAYS SINCE LAST LTA 841
WATER DEPTH 80 LAST BOP TEST 07/24/95 LAST CSG TEST 06/29/95
/GALLOWAY DR BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED 1350 e 30
PP2- · KILL SPEED 2700 e 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
- -1.50 - CONT. TO -POI{- WITH BI{A: ...............
~50---5/D-MWD -TOOL AND- CHANGE-OUT- RECIEVER-'SUBi
6.00 TUBOSCOPE REP ON PLATFORM. INSPECT ALL BHA COMPONENTS.
RIH WITH BHA. FILL PIPE AT 5538' AND TEST MWD. BREAK CIRCULATION AT
10480' AND RF_.AMED TO TD - 10520.
ROTARY DRILL FROM 10520' TO 10685'.
3.50
8.50
4.00
CHECK FLOW~ PUMP PILLr AND POH WITH BHA.
NOTE: DAILY COSTS INCLUDE $26r000 BAKER CHARGES FOR LINER TIE-BACK.
SEP 8 199b
.......... TIME ~HRS)
...... d~M%--k0¥-. ~S
ROTATING
MUD MOTOR
TRIPPING
C&C
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CE~ENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
Gas Cons, Commission
........ 191.
8.50
9.00
6.50
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
I' 'E PLATFORM "A"
, A34-11LS
WORK ORDER 731400
SIDE TRACK
-DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: RIH WITH BHA
SWEPI , ~A DAILY DRILLING REPORT
PROG. DEPTH
PRESENT DEPTH
FOOTAGE DRILLRD
SIZE OF LAST CSG
DEP. OF LAST CSG
WATER DEPTH
11599
10851
166
7.000
9480
80
/GALLOWAY DR
SUMMARY OF OPERATIONS (SHOW HOUR~ FOR EACH OPERATION) :
CONT TO POH WITH B HA.
.50
1.50
4.00
1.00
8.50
.50
4.00
1.00
PAGE 1 OF 1
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 38.4 DAY
NLTA LTH/YTD / EST. DAY
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 842
07/27/95
35
50
sop TEST 0v/24/95 L~r CSG TEST O6/29/95
BHA INSPECTION (CUM. ROT HRS)
PPX· KILL SPEED 1350 · 30
eP2 · KILL SPEED 2700 e S0
3.00
L/D MWD AND CHANGE OUT TO BIT #15. ORIENT TOOL FACE AND SURFACE CHECK
MWD.
RIH WITH BHA. FILL DP AND CHECK MWD AT S000'.
CONT TO RIH WITH BHA TO 10t670' AND B~ CIRCULATION. RIH SLOWLY TO
10e685'.
ROTARY DRILL FROM 10e685' TO 10?851'.
CI~ECK FLOW AND PUMP DRY JOB.
POH WITH BHA.
L/DMWDAND CHANGE OUT TO BIT #16. ORIENT TOOL FACE AND SURFACE CHECK
MWD.
RIH WITH BHA. FILL DP AND CKECK MWD AT 5000'. RIH WITH BHA AT REPORT
TIME.
NOTE: LOW DAILY COST DUE TO CORRECTION TO ONGOING COSTS. CUM. COSTS
SWEPI ALASKA DAILY DRILLING REPORT
TIME (HRS)
CUM. ROT. HRS 199.50
ROTATING 8.50
MUD MOTOR
TRIPPING 12.50
C & C .50
REAMING
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNlqING CASING
CEM]~T~ING
PICKUP/LAYDOWNDS
INSPECT BHA 2.50
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
PAGE 1 OF 1
RI~ NAME PLATFORM "A' PROG. DEPTH 11599
D MIDDLE GROUND SHOAL PRESENT DEPTH 10953
L~.%SE PLATFORM "A" FOOTAGE DRILLED 102
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 9480
SIDE TRACK WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE 07/28/95
DIST. KB TO BHF 38.4 DAY 36
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 843
LAST BOP TEST 07/24/95 LAST CSG TEST 06/29/95
DRILLING FOREMAN: WELLS R V /GALLOWAY DR BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: RIH WITH BHA PP1 ~ KILL SPEED 1350 e 30
PP2.~ KILL SPEED 2700 ~ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
-- t.00- CONT TO RIH-WITH BHA TO WINDOW: .............................. I - ....... TIME (HRS)
--~].00--SLIP--AND~L73T 1-00~-~DF-DRILL LINE-AND PERFORM-MINOR RIG'REPAIRS.
.50
2.50
8.50
S.O0
1.00
3.50
--
- --
RIH TO 10768' AND BREAK CIRCULATION.
ATTEMPTED TO REAM OPEN HOLE. ENCOUNTERED HIGH TORQUE. HOLE APPEARS TO
HAVE PACKED OFF AT 10,773'. POH TO 10e582 AND SLOWLY REAMED OUT OPEN
HOLE FROM 10582 TO 10851'. HOLE CONDITIONS IMPROVED AFTER BOTTOMS UP.
ROTARY DRILLED/ SLIDE FROM 10,851' TO 10,953'. TOTAL SLIDE TIME 2 HRS.
POH WITH BHA - LAST 15 STDS PULLED WET.
CHECKED MWD AND CHANGED OUT BHA TO BIT #17. SURFACE CHECK MWD.
RIH WITH BHA. FILL DP AND CHECK MWD AT 5000' AND SHOE. RUNNING IN
HOLE WITH BHA AT REPORT TIME.
IADC BIT GRADE BIT fils - 5-6-BT-H-E-1/32-CT/ER-HRS
IADC BIT GRADE BIT #16 - 4-5-BT-H-E-1/32-ER-HRS
-~"UM.--qIOT 2--HRS ......... ~08 . 00 ...........
ROTATING 8.50
MUD MOTOR
TRIPPING 9.50
C & C .5O
REAMING 2.50
SURVEYS
JET
REPAIRS 2.0O
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 1.00
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
~RI~ NAME PLATFORM 'A" PROG. DEPTH 11599
) MIDDLE GROUND SHOAL PRESENT DEPTH 11102
_LE~SE PLATFORM "A' FOOTAGE DRILLED 149
~WELL A34-11LS SIZE OF LAST CSG 7.000
.-~ORK ORDER 731400 DEP. OF LAST CSG 9480
<SIDE TRACK __ WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE 07/29/95
DIST. KB TO BHF 38.4 DAY 37
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS
DAYS SINCE LA.gT LTA 844
LAST BOP TEST 07/24/95 LAST CSG TEST 06/29/95
~DRILLING FOREMAN: WELLS R V
~RESENT ACTIVITY: ROTARY DRILLING
/GALLOWAY DR
~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
.50 CONT TO RIH WITH BHA AT REPORT TIME.
~_1.00 BREAK CIRCULATION AND REAM OPEN HOLE FROM 10764' TO 10953'.
8.50 ROTARY DRILL FROM 10953' TO 11102'.
.50 CHECK FLOW AND PUMP DRY JOB.
4.50 POH WITH BHA.
1.50 L/D BHA AND M/U BIT #18. L/D MWD AND DIRECTIONAL EQUIPMENT.
4.50 RIH WITH BHA. FILL DP AT 5000' AND SHOE.
1.50 SERVICE TOP DRIVE/CUT AND SLIP 100' OF DRILL LINE.
1.00 RIH WITH BHA TO 10965' AND BREAK CIRCULATION.
REAM OPEN HOLE FORM 10965' TO 11100'. BEGINNING TO ROTARY DRILL NEW
HOLE AT REPORT TIME.
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED
PP2 · KILL SPEED
1020 % 20
2350 ~ 40
TIME (HRS)
CUM. ROT. HRS 216.50
ROTAT I NG 8 . 50
MUD MOTOR
TRIPPING 10.50
C & C
REAMING 1.50
SURVEYS .5 0
REPAIRS 1.50
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 1.50
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUAT I ON
CORING
OTHERS
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIS NAME PLATFORM "A' PROG. DEPTH 11599
[ ) MIDDLE GROUND SHOAL PRESENT DEPTH 11195
~E PLATFORM "A" FOOTAGE DRILLED 93
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 9480
SIDE TRACK WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE 07/30/95
DIST. KB TO BHF 38.4 DAY 38
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 845
LAST BOP TEST 07/24/95 LAST CSG TEST 06/29/95
DRILLING FOREMAN: WELLS R V /GALLOWAY DR BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: ROTARY DRILLING PP1% KILL SPEED 1020 ~ 20
PP2 ~ KILL SPEED 2350 ~ 40
__.SUMMARY OS OPERATIONS ._(SHOW HOURS .FOREACHOPERATION) : ............................................
___I_0.0___ROTARY__DRILLED FROM i!,!02'_TO .11,113~ .........................
2.50 BIT STUCK AT 11,113'. SET OFF JARS UP TO 250K AND WORKED DP UP TO
290K. ABLE TO SUSTAIN CIRCUI2%TIONAND ROTATION THROUGH THE MOTOR.
LOST JARS WHILE WORKING PIPE. PUMPED HIGH VIS SWEEP. TRAPPED TORQUE
IN STRING AND WORKED DP. WORKED FREE AT 275K. NOTE: SWEEP WAS UP IN
9 5/8 CASING WHEN DP CAME FREE.
2.50 POH WET TO CASING SHOE. PUMP DRY JOB AND DROP SHEAR BAR.
3.00 POH WITH BHA.
1.50 L/D BHA AND M/U BHA WITH BIT #19.
6.00 RIH WITH BHA RETORQt~EING ALL 2 7/8 PAC CONNECTIONS. FILLED DP AT 5000'
1.50
AND 9450'. CONT TO RIH TO 11t066'.
BREAK CIRCUI2%TION A/gD REAMED OUT OPEN HOLE FROM 11r066' TO 11,113'.
CLEANED UP POSSIBLE COAL SEAM FROM lltll0 TO lltl13'.
6.00 ROTARY DRILLED FROM 11,113 TO 11~195'. ROTARY DRILLING AT REPORT TIME.
....... TIME (HRS) _. .
CUM. ROT. HRS 223.50
ROTATING 7.00
MUD MOTOR
TRIPPING 11.50
C&C
REAMING 1.50
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 1.50
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
SWEPI A~,,%SKA DAILY DRILLING REPORT
PAGE 1 OF 1
RT~ NAME PLATFORM "A"
D MIDDLE GROUND SHOAL
Lh~,SE PLATFORM
WELL A34-11LS
WORK ORDER 731400
SIDE TRACK
PROG. DEPTH 11599
PRESENT DEPTH 11209
FOOTAGE DRILLED 14
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 9480
WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE 07/31/95
DIST. KB TO BHF 38.4 DAY 39
_
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD . / DAYS +/-
DAYS SINCE LAST LTA 846
LAST BOP TEST 07/24/95 LAST CSG TEST 96/29/95
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: POH WITH DRILL PIPE
/GALLOWAY DR
S~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.00 ROTARY/MOTOR DRILL FROM 11195' TO 11209'.
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED
PP2 ~ KILL SPEED
2.00 CIRCUI2%TE BOTTOMS UP TO CONDITION HOLE AND OBTAIN MUD LOC_4~ING SAMPLE
OFF BOTTOM.
5.00 CHECK FLOW AND PUMP DRY JOB. POH WITH BHA.
.50 L/D BHA.
8.00 R/U SWS. RIH WITH IR/GR LOGGING TOOL TO 11,188'. LOST GR SIGNAL FROM
TOOLS AT 11r188'. CONTINUED TO TD AND RAN INDUCTION LOG. POH AND
REPAIRED GR TOOL. MADE 2ND TRIP IN HOLE TO LOG GR (GR WAS RUN kLONE
WITHOUT INDUCTION TOOL). RD SWS.
.50 M/U BHA WITH BIT RR#8.
6.00 RIH WITH BHA. FILL DP AT 5000' AND SHOE. CONT TO RIH 11100' AND
ENCOUNTERED BRIDGE AT 11100'.
1.00 PULLED UP HOLE TO 11050 WIT~ NO OVERPULL. M/U TOP DRIVE AND BROKE
CIRCUI2%TION. ~ED OPEN HOLE FROM 11050' TO 11090' WIT}{ NO WEIGHT
ON BIT. PICKED UP TO CHECK PICK UP WEIGHT AND PACKED OFF - PUMP PSI
HYDRAULICED STRING UP 15K AND PUMP PSI DROPPED FROM 3200# PSI AT 50
SPM TO 1100# WITH 50 SPM AND LOST 25K STRING WEIGHT. BEGAN TO POH
TO DETERMINE WHERE STRING PARTED.
1020 e 20
2150 ~ 40
TIME (HRS)
CUM. ROT. HRS 224.50
ROTATING 1.00
..
MUD MOTOR
TRIPPING 11.00
C & C 2.OO
REAMING 1.00
SURVEYS
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CF24ENTING
PICKUP/LAY DOWN DS
INSPECT BHA 1.00
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 8.0O
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
NAME PLATFORM "A' PRDG. DEPTH 11599
~__~/) MIDDLE GROUND SHOAL PRESENT DEPTH 11209
LEASE PLATFORM "A" FOOTAGE DRILLED
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 9480
SIDE TRACK WATER DEPTH 80
DRILLING FOREMAN: WELLS R V /GALLOWAY DR
PRESENT ACTIVITY: RIH WITH 3.5 SLOTTED LINER.
ELEVAT. KB TO MSL 116.'0 DATE 08/01/95
DIST. KB TO BHF 38.4 DAY 40
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 847
LAST BOP TEST 07/24/95 I~T CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED 1020 ~ 20
P~2 e KILL SPEED 2150 ~ 40
_ SUMI~UkRY_.OF_ OPERATIONS_ISHOW HOURS. FOR~.ACH. OPERATION)__~ .........................................
~____ 5.00__POH WITH DP TO_FIND_TOP OF ~ISH.,_FOUND 2 7/8 .PAC_.P.I.N_ CONNECTION ................ TIME (HRS) _
1.00
3.00
1.50
4.50
3.00
1.50
2.50
2.00
TWISTED OFF. 2 7/8 PAC TOOL JOINT LOOKING UP.
2511.97' OF FISH IN HOLE. SUSPECTED TOP OF FISH AT 8697' +/-.
M/U 3 15/16" OVERSHOT WITH SPIRAL GRAPPLE FISHING ASSEMBLY.
RIH WITH ASSEMBLY TO 8555'.
BREAK CIRCULATION AND CIRCULATED HOLE 1/4 HR TO CLEAN UP MUD ON TOP
OF FISH. TAGGED TOP OF FISH AT 8692'. WHILE SLOWLY CIRCULATING
ROTATED OVER TOP OF FISH TO ENGAGE. P/U 193K (25K OVER P/U WEIGHT).
POH SLOWLY WITH FISH.
L/D ALL FISH ¢ MOTOR ASSEMBLY{ AND BIT RR#8.
R/U ALL ASSOCIATED EQUIPMENT TO RUN LINER. HELD PRE-JOB SAFETY MEETING
M/U 3.5 9.2# SLOTTED LINER WITH BAKER HANGER ASSEMBLY. FULL
DESCRIPTION OF LINER WILL BE ON NEXT MORNING REPORT AFTER FINAL
SETTING OF LINER.
RIH SLOWLY WITH LIINER. RLggNING IN HOLE AT REPORT TIME.
NOTE: LOU GAMALDI WITH AOGCC WAIVED WEEKLY BOP TEST DUE TO TIMING
OF RUNNING LINER UNTIL BOP RAMS CHANGED TO 2 7/8.
CUM. ROT. HRS 224.50
ROTATING
MUD MOTOR
TRIPPING 14.50
C & C 1.50
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CA.SING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 1.00
RIG UP/TEAR DOWN 1.50
WAIT ON WEATHER/MAT
EVALUATION
CORING
SWEPI . JKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM
F' n MIDDLE GROUND SHOAL
L PLATFORM "A"
WELL A34-11LS
WORK ORDER 731400
SIDE TRACK
-DRILLING FORF24AN: WELLS R V
PROG. DEPTH' 11599
PRESENT DEPTH 11209
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 9480
WATER DEP77{ 80
/GALLOWAY DR
ELEVAT. KB TO MSL 116.0 DATE 08/02/95
DIST. KB TO BHF 38.4 DAY 41
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 848
L0kST BOP TEST 07/24/95 LAST CSG TEST ~
BHA INSPECTION (CUM. ROT HRS)
~'PRESENT ACTIVITY: POH WITH DRILL PIPE.
PPl · KILL SPEED 1020 ~ 20
PP2 · KILL SPEED 2150 ~ 40
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
6.00 CONT. TO RIH WIT}{ 3.5 LINER. TAGGED BOTTOM AT 205'. PULLED LINER INTO
VERY SLIGHT TENSION. SETTING DEPT~S~ LINER SHOE 11,205'. TOP OF
PACKOFF SUB 11,193.7'. TOP OF BAKER LINER PACKER 9401.47'. TOP OF
TIE-BACK SLEEVE 9394.18. CONFIGURATION OF LINER SHOE, PACKOFF SUB,
57 JTS. 3.5 9.2~ SLOTTED LINER, X-OVER, BAKER LINER HANGER WITH 7.3'
TIE-BACK SLEEVE.
.50 BROKE CIRCUI2%TION AND CIRCUI0kTED DP VOLUME TO CLEAN UP HOLE.
1.00 DROP 1 7/16 BALL AND SD 30 MIN. PRESSURED UP ON BALL. LINER HANGER
SET AT 1500#. SHEARED AT 2300#. ROTATED 15 TURNS TO RIGHT TO RELEASE
RUNNING TOOL FROM HANGER.
.50 C~ECK FLOW AND PUMP DRY JOB.
3.50 POH WIT}{ DP AND LINER RUNNING TOOL.
3.50 .R/U EQUIPMENT TO RUN WASH STRING. P/U STINGER AND 1.25 WASHSTRING WITH
BAKER RUNNING TOOL.
5.00 RIH WITH 1.25 WASH STRING.
2.00 STING INTO 3.5 LINER PACKOFF ASSEMBLY. UNABLE TO OBTAIN CIRCUI0kTION
THROUGH ASSEMBLY. UNSTUNG FROM PACKOFF. WASHSTRING APPEARED TO STICK
7/- 10' ABOVE ASSEMBLY. WORKED FREE AT 210K.
1.00 POH WITH WASHSTRING TO TOP OF 3.5 LINER. BROKE CIRCULATION TO DETER-
MINE IF 1.25 WASHSTRING WAS OPEN.
-_ _' ~ CHECK FLOW. MIX AND PUMP DRY JOB. BEGIN TO POH WITH WASHSTRING AT
SWEPI ALASKA DAILY DRILLING REPORT
REPORT TIME.
TIME (HRS)
CUM. ROT. HRS 224.50
ROTATING
MLrD MOTOR
TRIPPING 15.50
C & C 2.5O
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 6.00
PAGE 1 OF 1
-RIG NAME PLATFORM "A" PROG. DEPTH 11599
D MIDDLE GROUND SHOAL PRESENT DEPTH 11209
. ~ ~E PLATFORM "A" FOOTAGE DRILLED
WELL A34-11LS SIZE OF LAST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 9480
SIDE TRACK WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE 08/03/95
DIST. KB TO BHF 38.4 DAY 42
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 849
LAST BOP TEST 07/24/95 LAST CSG TEST ~
DRILLING FOREMAN: WELLS R V /GALLOWAY DR BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: CIRCLrLATING DIESEL PP1 ~ KILL SPEED 1400 ~ 20
- ~ PP2.~ KILL SPEED 2100 ~ 40
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
.... 3.50 POH-WITH DP TO-RETRIEVE-WASHSTRING RUNNING 'TOOL-. ......................... I_ . ' -'TIME (HRS)
--~.00--L/D-RUNNINGTOOL ASSEMbLY-AND M/U-~.25~--~/8--PAC~=OVER. 1' CUM.-RO'P/-HRS ...... ~224'150
4.00 RIH WITH WASHSTRING. FILL DP AT 4950' AND 8530'.
1.00 CUT AND SLIP 100' OF DRILL LINE.
1.00 CONT. TO RIH TO 10750'.
.50 M/U TOP DRIVE AND BREAK CIRCULATION. WASH DOWN FROM 10750' TO 11115'.
TAGGED UP AT 11,115'. BEGIN CIRCLrLATION BOTTOMS UP AT 11115'.
8.50 CIRCULATE AND CONDITION MUD WHILE WORKING PIPE 20' UP AND DOWN OFF
BOTTOM.
4.50 HELD PRE-JOB SAFETY MEETING. DISPLACED MUD WITH 60 BBLS HIGH VIS
PILL FOLLOWED BY CLEAN DIESEL AT THE RATE OF 2.6 BPM WITH 3500# DP
PSI. DISPLACING DIESEL AT REPORT TIME.
NOTE: DAILY COSTS INCLUDES 25M$ DIESEL COSTS FOR CIRCLrLATION.
SEP 't 8
/~!~ ~0[[ .& Gas Cons. Commission
: ~chorafle
ROTATING
MUD MOTOR
TRIPPING 8.50
C & C 13.50
REAMING
SURVEYS
JET
REPAIRS 1.00
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA 1.00
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
SWEPI A~LASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A' PROC. DEPTH 11599
F' ~ MIDDLE GROUND SHOAL PRESENT DEPTH 11209
L ~ PLATFORM "A" FOOTAGE DRILLED
WELL A34-11LS SIZE OF L;%ST CSG 7.000
WORK ORDER 731400 DEP. OF LAST CSG 9480
SIDE TRACK WATER DEPTH 80
DRILLING FOREMAN: WELLS R V /GALLOWAY DR
PRESENT ACTIVITY: RIH WITH COMPLETION EQUIPMENT
SUM~t%RY OF OPEP. ATIONS (SHOW HOURS FOR EACH OPERATION)
.50 CONT. WITH DIESEL CIRCULATION.
1.00 CHECK FLOW AND MIX 60 BBL HIGH VIS. PILL.
3.50 PPD PILL SWEEP FOLLOWED BY CLEAN DIESEL.
1.00 CHECK FLOW - NO FLOW AFTER DIESEL DISPLACEMENT.
9.00
1.00
3.50
ELEVAT. KB TO MSL 116.0 DATE 08/04/95
DIST. KB TO BHF 38.4 DAY 43
NLTA LTH/YTD / EST. DAY 50
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 850
LAST BOP TEST 08/03/95 LAST CSG TEST 06/29/95
BHA INSPECTION (CUM. ROT HRS)
PP1 · KILL SPEED 1400 ~ 20
PP2 ~ KILL SPEED 2100 ~ 40
POH WITH DP AND BHA. L/D ALL 2 7/8 PAC DRILL PIPE.
CHA_NGE OUT BOP RAMS FROM 3.5 TO 2 7/8.
LOU GRAMALDI WITH AOGCC ON PLATFORM. PERFORM SUCCESSFUL BOP TEST.
4.50 HELD PRE-JOB SAFETY MEETING. BEGIN TO RIH WITH COMPLETION. FULL
DESCRIPTION OF EQUIPMENT TO BE ON NEXT MORNING REPORT. PICKING UP
COMPLETION EQUIPMENT AT REPORT TIME.
NOTE: CONTACTED AOGCC AND REQUESTED WAIVING BOP TEST DUE TO ONLY
HAVING TO RUN COMPLETION EQUIPMENT. AOGCC DENIED REQUEST.
TIME (HRS)
CUM. ROT. HRS 224.50
ROTATING
MUD MOTOR
TRIPPING 13.50
C&C 4.00
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH 1.00
TESTING BOP /WH 3.50
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 2.00
EP 1 8 1995
Gas Cons. Commissior~
~cl~orage
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 2
RIG NAME PLATFORM "A" PROG. DEPTH 11599 ELEVAT. KB TO MSL 116.0 DATE 08/05/95
D MIDDLE GROUND SHOAL PRESENT DEPTH 11209 DIST. KB TO BHF 38.4 DAY 44
-L~,,SE PLATFORM "A" FOOTAGE DRILr.wn NLTA LTH/YTD / EST. DAY 50
WELL A34-11LS SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/-
WORK ORDER 731400 DEP. OF LAST CSG 9480 DAYS SINCE LAST LTA 851
. .
SIDE TRACK __ WATER DEPTH 80 LAST BOP TEST 08/03/95 LAST CSG TEST 06/29/95
DRILLING FOREMAN: WELI~ R V /GALLOWAY DR BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: PREPARING FOR RIG MOVE
PP1 · KILL SPEED
PP2 ~ KILL SPEED
SUM~U~RY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
5.00 RIH WITH COMPLETION EQUIPMENT AS FOLLOWS: WIRELINE RENTRY GUIDE
(3.688X2.441X.41), I JT 2 7/8 EUE 8RD TBGr OTIS "XN" WITH 2.25 NOGO
(3.19X2.25X1.01)~ 1 JT TBG, 1 2 7/8 PUP ,IT., BAKER "FH" PACKER
WITH 40K STRAIGHT PULL RELEASE (5.968X2.441X6.62)~ 1 2 7/8 PUP JT~
I 2 7/8 JT TBG, OTIS "X" NIPPLE WITH 2.31 PROFILE (3.19X2.313X.95),
i JT TBG, GLM #6 W/PUPS, 19 JTS TBG, GLM 15 W/PUPS, 24 JTS TBG, GLM
#4 W/PUPS, 33 JTS TBG, GLM #3 W/PUPS, 43 JTS TBG, GLM #2 W/PUPS,
56 JTS TBG, GLM #1 W/PUPS, 50 JTS TBG, BAKER "FV-6" SSSV W/ 2.31
PROFILE, 9 JTS 2 7/8 EUE 8RD TBG, 1 2 7/8 2' PUP, TUBING HANGER.
UP WT 98K, DOWN WT 93K, 9 BANDS IN HOLE AROUND CONTROL LINE.
LANDED TBG HANGER AND SECURED. WIRELINE REENTRY GUIDE AT 7479.19.
'XN' NIPPLE AT 7447.16. BAKER PACKER AT 7~3-. 'X' NIPPLE AT
1.00 REVERSE CIRCULATED 1 1/2 TIMES TBG VOLUME TO CLEAN OUT TBG I.D.
3.00 RU SLICKLINE UNIT. INSTALLED AND TESTED LUBRICATOR. RIH AND SET BLANK
PLUG IN XN NIPPLE. PRESSURED UP ON TBG TO 1200# TO SET PRODUCTION PKR.
PRESSURE TESTED CSG ANNULUS TO 1000#. POH WITH BLANKING PLUG AND RDSL.
-
1.00
~ O0
CLOSED SSSV, L/D LANDING JT., SET BPV, FI_/k~H MUD LINES AND CHOKE LINE.
REMOVE ASSOCIATED BOP EQUIPMENT. R/D BOP EQUIPMENT. HELD PRE-JOB
SAFETY MEETING. R/D WELLHEAD RISER AND INSTALLED WELLHEAD. N/U TREE
AND ASSOCIATED PIPING. TESTED TREE TO 50008.
.50 PULL TWO WAY CHECK VALVE. TURN WELL OVER TO PRODUCTION.
TIME (HRS)
CUM. ROT. HRS 224.50
ROTATING
MUD MOTOR
TRIPPING 5.00
C& C 1.00
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH 8.00
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICK-UP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN 6.00
WAIT ON WEATHER/MAT
EVALUAT I ON
CORING
OTHERS 4.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 2 OF 2
RIG NAME PLATFORM "A" DATE 08/05/95
FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A"
WELL
WORK ORDER 731400
A34-11LS SIDE TRACK
SUMMARY OF OPERATIONS CONTINUE --
5.50 BEGAN TO DISMANTLE AND TEAR OUT ASSOCIATED EQUIPMENT IN PREPARATION
FOR RIG MOVE FROM LEG 1 TO LEG 2.
NOTE: DAILY COSTS INCLUDES $22K FOR BAKER PRODUCTION EQUIPMENT.
SEP 1 8 1995
6t~, Pil .& Gas Cons. Corrm!issiOn
~'~-' ~nchorage
-95
10:24
Anadrill DPC
ANADRILL-SCHLUMBERGER
SURVEY CALcULATiON REPORT
vet - 1.27
907
2160
P.02
Company: SHELL ~JESTERN E~..P.
Lo:--ation: PLATFORM "A"
Field: MIDDLE GFY]UND SHOAL
D~cl inat ion: 0.00
Operator: ANADRILL SCHLUMBERGER
Date: 07-23-95
Filename: SHL
Comments: SI OETRACK
Data Source (D.S.) type~ :
CS - CHAM? Slngleshot
CM - CHAMP Multishot
CC - CHAMP Compensated
GC -Gyrc Singleshot
GM - Gyro Multishot
Probe #: 0
Section Plane: 23~.35
Well no: A34-11LS
Vertical Section Origin:
North: 0.00 East :
Time: 09:~5
Depth Unit~ -> FEET
(Manually entered data starts with '*' )
MS --- Magnetic SS TD - Total Depth
MM - Magnetic MS TI - Tiein Point
hlW - M.H.D.
PR - Projection
ST -- Steering Too!
0.00
Measured Inc
Depth (deq)
-.~iculation Method - Minimum Curvat:_;~-'-s
~-*** RECORD OF SURVEY ****
Azimuth FVD T 0 T A L Vertical
<deg) Rec Coo,-'d inat e~ Section
Dogleg
Severit';
8303. '~., 15 · 51
8358.5 1 TM -~0
8389.6 i5.00
8420.7 16.90
8451.6 18.50
IRA__.81 ~:,~J~.O 1487.06 1553.3W 2144.8
164.8~ '7848.8 i50G, qS 1549.9W 2150.8
i62.20 7878.9 1507.76 1547.8W ;2153.8
161.80 7908.8 1515.86 1545.1W 2156.9
159.50 7938.2 1524.76 1542.0W 2160.2
0.00
4.08
5.83
6. i2
5.65
*T [
*MW
*MW
-~ MI, g
8483.7 21.00
8515.8 2'2.90
8547.9 24.80
85'?~. 0 27. 70
r., ~. ~ O. 0 3~. 20
157.80 7968.5 1534.86 1538.0H 216S.5
155.10 7998.2 1545.76 15Z3.2W 2166.9
156 00 ~0~7 6 1557 6~ 1~'-' 9W ~
.... o _,a7 '-170.~
154.40 8055.5 t570.06 1522.1~ 2173.8
=-' ~.56 1515.5W di77.3
l~.d,O 8082.6 1=-a .....
7.99
6.70
6.03
9.60
8. i6
*Mt,;
.~.MW
*MW
· ~ !
854i. I 31.30
8-767.7 ¢,_."'-' 20
8736. ¢,_ ~':'~=. 60
8768.':' ~-:' 80
8799.~. .~.~':' 50
!51.~0 8i99.3 1597.76 1508.2W 2!80.7
152.40 8166.0 1528.66 1491.8W '2187.9
156.30 8190.4 !642.26 1484.4W 2190.3
148.60 8217.0 1656.96 1475.7W 2193.5
152.!0 8243.6 1671.8S 146'7.3~,~ 2!96.5
4.6i
1.43
4. 13
2.97
8831. 7 ¢~.-;v 56
8863.6 34.70
8'895.6 35.60
8927.5 36.59
~q ~- ~6 80
89~,~. .
153.90 8270.3 1687.-26 i459.4W 2200.3
154.2~ 8296.7 1703.36 145t.6W 2204.5
i57.7G 8322.9 1720.16 i444.1W 2209.5
162.20 8348.7 1737. ~'~ I437.7W ~':'°15.8
164.70 8374.4 i756.06 1432.2W 22'23.3
4.40
3.8~3
6.90
8.77
4.76
~MW
*M~J
~ MW
*MW
8991.5 37. I0
9028.0 _,.=~ 10
9049.3 36.70
9080.3 36.70
9111.3 36.80
167.50 ~S$9.9 1774.76 14,£7.61~ 2231.6
173.50 8429. i 1796.46 1424.0W 2242.7
175.30 8446.1 1809.1~ 1422.7~-~ 2249.~
178.40 8471.0 1827.66 !421.7~ 2260.8
iG2.30 5495.8 1846.26 1421.~W 2272.2
5.34
9.91
5.4i
5.98
7.53
~-MW
*.-MN
',l'4t(
9143.4 ~.,.:w 4~
9!75.5 -37.80
9207.6 -Z~.40
9238.7 38.20
9269.7 38. i~
189.3¢ 852i.4 1865.46 1423.8W 2286.5
1~';.30 8546 S 1°°'
· ~.7S 1426..9W 2.201.3
i91.40 8572.1 1904.26 1430.5~ 2'316.5
194.30 5596 5 1923.~ ........
. z.a i434.8W
197.10 8620.9 1941.49 1440.~W 2347.5
3.29
1 %~-
"-i. q5
5.82
5.58
~ MW
Sep-O1-95 10-24 Anadrill DPC
907 ~44 2160
P.(_
ANADR ~ LL ..-"3C'HL UMBE F:G~-: F:
Company: SHELL WESTERN E&P.
[,ecl i~lat ic.n:
,-r-ilename: SHL
~ p
oection lane; E35.
Date: 07 '-'-'
Depth Units -) FEET
C, 9. 9 ;.{'c ' e o4 J. 1-., c
Depth ,.'de q)
92;00.6 2:8.30
9332.6 38. 10
9364.4 38. 10
9396.2 ,'.!,'3. 10
942E',. ~, 39.70
Catc:ulation Method -- Minim..Im Curvat.:.-~ **** RECORD OF SURVEY
f~zim:.!l:.h T'JC, T 0 T ~ L Vertical
(deg) Rec Coordinates oecd. i or,
2G0.60 86,44.7 1959. 1S 1446, OW 2363.
2~3. 4~ ~670.3 1977.8S 1453.6W 2381.
206.90 ~ ~'~. · ·
~o_~.=, 4 1995.6S 1461 9N ':,"399
20'3.00 ;3720. 4 2012.9S 147i. 1W 2417.
216. ~0 8745.2 2029.7S 1482. OW 24~6.
D o q I e g
'7. J. 7
5
6. 79
4. 98
1-S. !8
*.'M~
*bibl
*HW
cc6.t-,'o'-'= 878,q 5 ~Z057.4S 1 = " a~,l ;:'-:;:72.
227.30 8800, 4 2664.7S 1514.2W 2483.
'Z'I, "2 · '-,~ .
224.90 8823,4 =g,9. 1S 1529 2W ~04
225.20 8846. 1 E094.0S i544. 1W 2525.
-' , ~8.8W ~546.
22~, 10 8868,9 ~109 iS 1==' '-''
5.
0.73
4.69
*MW
9656. =' 46.
9682, 0 47.50
971q. 5 47. 90
9777, 6 5i.
q845.. 7 51, .-_';0
228. v0 89i3.5 2139 =~' =~'
, . ~,o 1 ~, _-0.3N 2589.
,:'.31,50 8930.9 2151.5S 1604.6W 2:/'.08,
c. oc. qO. 8q'~'', _~, TM, 2166 .2S 1623.6W 2R32~ .
= z.,',. ~,0 8993.6 ~ ~ 94.9 S 1 ~ (, - 1 W 2' .q9
-':'~ $33. - .....
c ~.~,. 00 9 6 da'Z,,. 2S I702.8W 2730.
8.40
9.31
3.41
5.62
1,71
*MW
~'MW
9904.0 ._,~ 70
9968.8 55.30
9998.7 54.80
i0~29.4 53.80
1~09i~. I 56.30
2,36, 40 90'7. i .5 ,:.'-"-' =c_ .., c.- ...... -~: ::, i 743.6 i,.,~ 2779 .7.,
238. 60 9 108. 0 ~7ci
'"' ..,o~ J786, 7W cid. d;6. 2
'-"-:'" ...... 70 ':.;'126 3 7:'2q7 6.~'-' 1808. 7W
....... , .
:-'dS. ti..~g', 91q4. ,:-_ 2307.8S 182q ,.vi 288i. 0
d~5. ',70 '5 lFd'~,. 1 d'337.0S 1871. qbi
4.25
3, 83
7.61
3.75
4.09
*MW
~.Mbl
3'34. 2:0 92i5.0 23S7. 1S 19i4.3W 3984.
'-'-~:' 9'"" c,d;:_'9 5 2-;;,79 SE: 193i 5t,4 3G05
,_.,,..,.'::";'-'~ ':',0_ 9,165. =; 241t3, 7S 1973. OW 3057.
:'~"'- 30 '3302, 8 244.[ ="-' ,-: .o10:5.
......... ..,::,_ '- 01D. 3:;4 -'
'23':J. 20 9340. i 2471 8S ~___,~,. 9N 3150.
i.-.36
6.72
0.97
,i'. 65
f:_'. 69
* MU
~M[-.J
x. MW
;i'35.0;3 937A. 6. ;250 ;,.. 5S 2096.2W .Z~? I '.;_'~. 2
233.60 9414, 1 252;0.8S 2~36.9W 3260.2
....... 9z'=-' A '2-'560 1S 2i77 2W 3309 9
~:d~..50 . ;.~c. .......
'- ~'"'" '-'~'~" 0S 7 ~' .....
c' ..... 00 q490 ~)
· c: ~,S-) '-"-
..... ,,. . .... ~ .-,--,: .-,;, 340~ =
Cob. 90 9527 2 Z61A =~ ,:~o7.:~; ,'..~
.-.5;. 7.':3
3.53
O. 88
i. 0.9
O. 3,}
*MW
*MW
~..~.'-'7~'; 70 956.4 . .q, 2645.3S 2298. %'W 3458.
.... t- '--,c
'-'~ ~C~
~,,-. 90 q636. . 6 2701 . 8S 238S. 5b} ~,.,.
239.90 9654.4 ~715. IS 2405.5W 3584.
24~. ~0 9687. 1 2739. iS 2447. OW 362;~.
2. i8
1.29
5.29
2. 0..7
*MW
*h!W
11021.6 57. lO
i 1047. ~' 5;;. 20
11100.?: 57,20
Ci._OSUR[;: Dicta;-,
D.'~ rect
;7:40.70 9721· 7
240 70
;5:40. 70 9764.
c.-e -- 3785. 154.
,'_-, r~ -- '2 ;?;..:/..3'f:
., tql,.I
*MW
Shell Western E&p Inc~
P. O. Box
Hou~on, TX 77001
..
August 31, 1995 r'"~
Mr. Larry Grant
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Grant:
SUBYECT:
LOG DATA FROM SWEPI MGS A-34-1 ILS, MIDDLE GROUND
SHOAL FIELD, COOK INI.~T, ALASKA
Enclosed please find the following log data t~om the SWEPI MGS A-34-1 ILS well in
Middle Ground Shoal Field, Kenai Borough, Alaska (API# 50-733-10084-02):
1 BLP Phasor Dual Induction - Gamma Ray log
1 BLP Lithodensity - Gamma Ray log
1 BLP Induction Resistivity - Gamma Ray log
1 Sepia Phasor Dual Induction - GR log
1 Sepia Lithodensity - Gamma Ray log
1 Sepia Induction Resistivity - Gamma Ray log
1 LIS tape DITE/LDT/GR/AMS
1 Tape Listing DITE/LDT/GR/AMS
1 LIS tape IRT-J/GR
1 Tape Listing IRT-J/GR
1 List of Formation Tops
Please sign one copy ofthis letter and remm to me !~t~t~e above address.
Very truly yours,
Mafia A. Bal~ En~eer ~ ~k~'C~io~/~_.
Se~or Petro~ysicfl
Received by: Date:
August31,1995
Mr. Larry Grant
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Grant:
Shell Western E&P Inc.
An nffillat~_ of ghell Off Company
P. O. Box 576
Houston, TX 77001
Ot¢I$1NAL
SUBJECT:
FORMATION TOPS PICKS FOR THE SWEPI MGS A-34-1 ILS,
MIDDLE GROUND SHOAL FIELD, KENAI BOROUGH, ALASKA
Here is a list of formation tops encountered in the SWEPI MGS A-34-11LS (API# 50-733-10084-02), as required by
the AOGCC. Please note that this well was drilled through the overturned limb of the Middle Ground Shoal
anticline, so the second set of Hemlock formation tops were encountered in reverse order.
A-34-11LS {KB= 116')
Approximate
Formation Top
MD TVD Subsea
I-ID 8,403' 7,892' -7,776'
HE 8,482' 7,967' -7,851'
I-IF 8,507' 7,99~' -7,875'
HI 8,605' 8,079' -7,963'
HK 8,640' 8,109' -7,993'
HN 8,836' 8,274' -8,158'
HR 9,044' 8,442' -8,326'
HR(overturned) 9,890' 9,063' -8,947'
HN 10,184' 9,232' -9,116'
HK 10,505' 9,420' -9,304'
HI 10,607' 9,483' -9,367'
I-IF 10,772' 9,581' -9,465'
HE 10,861' 9,632' -9,516'
HD 10,958' 9,687' -9,571'
HC 11,105' 9,767' -9,651'
TD 11,209' 9,822
If you have any questions, I can be reached at (713) 544-2389.
Very truly yours, dA
," / ~/./' 4 (I
Senior Pot oph. io,,
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
,/
TO: David Joh n~!~n, DATE:
Chairma11-~4~'
August 4, 1995
THRU' Blair Wondzeli, ~ FILE NO:
P. !. Supervisor ~'/¥fgf
FROM: Lou Grimaldi, ¢¢~-r~ SUBJECT:
Petroleum Inspector
AV3JHDCD.DOC
BOP test
Shell Platform "A"
Middle Ground Shoal
PTD #95-88
Friday, August 4,1995: i witnessed the weekly BOP test on Shell Platform "A"
which is presently drilling Shell's well #A34-11LS in the Middle Ground Shoal
field.
The test went very well with all components functioning and holding their
pressure test properly. The rigs gas detection system was in place and
operational but due to the late hour I opted not to test the system as the alarm
would sound throughout the platform and wake all personell. There was
documentation showing the regular testing of these systems. All other equipment
i observed had the appearence of regular maintenence.
SUMMARY: I witnessed the weekly BOP test on Shell Platform "A".
Test time 3 hours. No failures.
Attachments: AV3JHDCD.XLS
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: X Workover: X
Drlg Contractor: Inlet Drilling Rig No.
Operator: Shell Western
Well Name: A34-11LS
Casing Size: Set @
Test: Initial Weekly X Other
A PTD #
Rep.:
Rig Rep.:
Location: Sec.
DATE: 8/4/95
95-88 Rig Ph.# 776-5241
R. V. Wells
Jerome Dodge
11 T. 8N R. 13W Meridian Seward
Test
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
PTD On Location OK
Standing Order Posted OK
Well Sign OK
Drl. Rig OK
Hazard Sec. OK
FLOOR SAFETY VALVES: Quan.
Upper Kelly / IBOP 1
Lower Kelly / IBOP 1
Ball Type
Inside BOP
Pressure P/F
250/5,000 P
250/5,000
P
1 250/5,000 P
I 250/5,000 P
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Quan. Test Press. P/F
1 P
250/5,000
f 250/5,000 P
250/5,000
f 250/5,000 P
f 250/5,000 P
1 250/5,000 P
3 250/5,000 P
1 250/5,000 P
t/IUD SYSTEM: Visual Alarm
Trip Tank P P
=it Level Indicators P P
Flow Indicator P P
Meth Gas Detector P* P*
H2S Gas Detector P* P*
CHOKE MANIFOLD:
No. Valves 13
No. Flanges 32
Manual Chokes 1
Hydraulic Chokes I
Test
Pressure P/F
250/5,000 P
250/5,000 P
P
Functioned
Functioned
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's:
Four Bottles
3,050 I P
1,450 P
minutes 33 sec.
minutes 27 sec.
OK Remote: OK
2500 Psi avg. Psig.
Number of Failures: 0 ,Test Time: 3.0 Hours. Number of valves tested 22 Repair or Replacement of Failed
Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Good Tesfi Gas detectors waived due to late hour, test on next oppurtunity.
Distribution:
orig-Well File
c - Oper./Rig
c- Database
c - Tdp Rpt File
c -InsP~l~¥L (Rev. 12/94)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
-IDCD.XLS
Louis R. Grimaldi
ALASKA OIL AND GAS
CONSERVATION COMMISSION
ADMINISTRATIVE APPROVAL NO. 44.62
TONY KNOWLE$, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Re:
The application of Shell Western E&P Inc. to drill, complete and produce the Middle
Ground Shoal No. A34-11LS well in the Middle Ground Shoal Field.
G. S. Nady
Manager - Asset Administration
Alaska Engineering/Asset Administration
Shell Western E&P Inc.
P. O. Box 576
Houston, Tx. 77001
Dear Mr. Nady:
The referenced application was received on June 13, 1995. The Middle Ground Shoal No. A34-
11LS well is to be drilled to the steeply dipping west flank of the reservoir. Structural complexities
in this portion of the field require producers to be drilled at less than 80 acre spacing to insure
adequate drainage. The subject well will be the third producer in the northwest quarter of section
14, T8N, RI3W SM..
The Alaska Oil and Gas Conservation Commission has reviewed the evidence available and hereby
authorizes the drilling, completion and production of the referenced well pursuant to Rule 6 of
Conservation Order No, 44.
DONE at Anchorage, Alas ·
Russell A. Douglass, Commisr~ner
erman Babcock, Commissioner
I
i
tLASg OIL GAS /
CONSERVATION CO SSION
TONY KNOWLE$, GOVERNOFi
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
June 19, 1995
G.S. Nady
Mgr. Asset Admin.
Shell Western E&P Inc.
P O Box 576
Houston, Texas 77001-0576
Middle Ground Shoal A34-11LS
Shell Western E&P Inc.
Permit No. 95-88
Sur. Loc. 1624'FSL & 430'FEL, Sll, T8N, R13W, SM
Btmnhole Loc. 3839'FSL & 3281'FEL, S14, TSN, R13W, SM
Dear Mr. Nady:
Enclosed is the approved application for permit to redrill the above
referenced well.
The permit to redrill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20AAC 25 035. Sufficient notice (approximately 24 hours) must be given
to allow a representative of the Commission to witness a test of BOPE
installed prior to drilling new hole. Notice may be given by contacting
.. .
David~.--Johnsto~ ~ ~--
Chairm~ ' / ~
BY ORDER OF MMISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA :
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill r~ Redrill ~ lb. Type of well. Exploratory ~Stratigraphic Test ~ Development Oil ~
Re-Entry ~ Deepen ~ Service[---'~ Development Gas~] Single ZoneF'-1 Multiple Zoner-~
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
Shell Western E&P Inc. 116' KB feet
3. Address 6. Property Designation ~ MIDDLE GROUND SHOAL
P.O. Box 576, Houston, TX 77001-0576 ADL ~/~'7-<'~
4. Location of well at surface 7. Unit or property Name 11. Type Bond (,ee 20 AAC 2S:025)
1624' FSL & 430' FEL Sll, T8N, R13W, S.M. MIDDLE GROUND SHOAL BLANKET
At top of productive interval 8. Well number Number
8303' MD-KB; 137' FSL & 1984' FEL 511, T8N, RI~, S.M. A34-11LS Amount00 HH 7522
At total depth
9. Approximate spud date
11599' MD-KB; 3839' FSL & 3281' FEL S14, T8N, R13W S.M. 6/20/95 $200,000
i 2. Disiance io nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
!property line
2464 feet 276 feet 3746 11599' MD feet
16. To be completed for deviated wells 17. Anticipated pressure (,, 20 sc 2s.o3s (e x 2))
Kickoff depth 8303 feet Maximum hole angle 52 o Maximum surface 928 ,.~g Attotal depth (TVD) 4603 ,.~
18. Casing program Setting Depth
s~ze Specifications Top Bottom ~-~___ Quantity of cement
Hole Casing Weight Grade 3oupling Length MD TVD MD TVD (include stage data)
,.o ,4s 00sx
,JUN 13 1995
19. To be completed for Redrill, Re-entry. and Deepen Operations A~g$i4t~ Oil & Gas Cons. C0mmisslo,
Present well condition summary Anchor~..?
Total depth: measured 10330 feet Plugs (measured) 9885' - 8108' CEMENT
true vertical 9793 feet
Effective depth measured 8108 feet Junk (measured)
true vertical 7607 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor
Surface 1644' 13-3/8" 1900 SX 1644' 1609'
Intermediate 6747' 9-5/8" 1100 SX 6747' 6306'
Production 3898' 7" 2200 SX 6427' - 10,325' 6007' - 9787'
Liner
Perforation depth: measured 7590' - 7613'; 7962' 8010'
true vertical 7110' - 7132'; 7466' - 7513'
20. Attachments Filing fee r~ Property platr~ BOP Sketch ~] Diverter Sketch r-] Drilling program [~]
Drilling fluid program [~] Time vs depth plot [~ Refraction analysis ~ Seabed report [~] 20 AAC 25.050 requirements F~I
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed0,~~,/,cy~G. S. NADYTitle HGR.-ASSET ADMIN. Date 6/7/95
t' ' Comission Use Only
Permit Number IApi number .... I Approv. al date JSee cover letter
~,~'- ~g;' [ 50- ,~_.~,~ - // d__) ~ ~ ~'- C~ ~ i f,+? -/¢~ ¢ ~ [for other requirements
Conditions of approval Samples required r--[ Yes~ No Mud Icg required r-~ yeS~ No
Hydrogen sulfide measures[~ Yes [~] No directional survey requiredT=~:(7] Yes [---] No
Required working pressur~ifj~hlE~iPE, r--:12M, r~[ 3M; ~ SM; I"~i-IOM; [~1 15M
Other: u ,~mu[ blgRe¢ ~y ' , , , ,
by order of
Approved by David W. Johnston Commissioner the commission Date ~-/~- ~c~-~
WELL LOCATION PLAT '
MID[)I__E. GR(.)tJNI.-) r-;I-IAI. FIELD
A--I~LATF(.)I~M C()()K INLET, ALAS::;KA
WL:'LL: A.34---1 1L%
%UIR F AC E'. LOCATION
1 (~24 i':-~:.L 4-,'5() F EL
f-:~l I TOSN Rt3W %M
Ki-'~I.. 1 1 6' MSL
2/' A'.,2~A-01G
A1 ;~-011NI,
A! 3- cji I.ND /
A44
All .-0lC
.%E.C (.) 1 TO~N I-~, 1 3W
-% I-WAt.~ [.) M I-.I,~II)iAN
Al2 -(.)lC,
A22 01"'
A23 ()
A25 01G
'f Al 4--01
A35 .-{)1 (;
A41 ': 1 ND
A1
A24..()11l I)
A41
A52--' 1C
1 I .....
/',43 11LW,?_'. ....... ~
A35-- 110
12C
A1.3-- 1 2G
.... ..," A23
12C
TIE.: -IN /
830.3 MI) 779)5 I
1,'57 ['~.~. 19~4 FEE
i I
A.~3- 111
.._
A54 -1 lC
1 4 TAI~(¢ET # 1 ~ -
~.~I~1~, Mf> 8~lf~ IV!)
4~/9 I ~1 ?(}2f] I-I'.L
%1 4 IO~N I~l.'~W %M -/'"'
.AC~I -
A.54-- 1 II..; TAF~[~ETff[/IIHL__ ~
~8_39 P~L .3281 t EL / ~.~.~
- ._
/
A33-- '
~4C
AZ2 - i 41 53
1 - 13~2C'-
A42
A,~,4 - 141~ 1G
~:\lV'/,,.i':';\.";I I! I I \AI'I /',1
A34 - 14 (;
? 4 f~ 1 .%-I- (;
14C
A13-- 12RDC
A11--13N1C
RECEIVED
JUN 1,5 1995
A~s~ Oil & G~s Cons. GommJssion
Anchor:'.,
AZ, 4 14 N2G
MIDDLE GROUND SHOAL WELL NO. A34-11LS
WELL PROGRAM
Middle Ground Shoal (MGS) A34-11LS will be a redrill of
existing well A34-11. The objective is the Hemlock reservoir.
The well will be drilled directional out of the existing 7"
casing through the Hemlock to a TVD of 10,116'. KOP will be at
the top of the Hemlock. The well will be completed with a 5"
cemented liner across the Hemlock reservoir.
The original existing perforations in the Hemlock have already
been abandoned by setting a cement plug across the perforations
from TD to approximately 200' above the top of the Hemlock
(8,zo8,).
The Hemlock will be perforated and produced. The existing
perforations above the Hemlock will be reperforated and produced
RECEIVED
,JUN I $ 1995
A~ask~ Oil & Gas Cons. Commission
Anchom
WELL:
LOCATION:
OBJECTIVE:
EVALUATION
A34-11LS
PLATFORM A, LEG 1, CONDUCTOR 4
1,624' FSL 430' FEL Sll TOBN R13W SM
HEMLOCK
GEOLOGY
DRILLING PROGNOSIS
FIELD:
KB:
MIDDLE GROUND SHOAL
116'
DRILLING
LOGS
DRILLPIPE
CONVEYED
LOGS
AMS
GR
CNL
LDT
DITE
MUD SIGNIFICANT
LOGGERS FORMATIONS
III
II
-'1
I
I
MD
(TVD)
330'
1,644'
(1,609')
III
II
IL
I
I
I
MUDLOGGERS
FROM KOP
TO TD
HEMLOCK HC
HEMLOCK HF
HEMLOCK HN2
HEMLOCK HK2
HEMLOCK HI2
HEMLOCK HF2
HEMLOCK HE2
HEMLOCK HD2
HEMLOCK HC2
TD
6,427' r~
(6,007m ) J L
I
8,100' J
(7,599') ~
I
8,303' L
(7,795'.)
11,599' --
(10,116')
HOLE
SIZE
6mI
HOLE
CASING
MUD DIRECTIONAL
PROGRAM PROGRAM
20mm
I
13 3/8"
9 5/8"
KOP
@
8,303'
ANGLE
BUILD
&
TURN
TO
52 DEG
S50W
5II
CASED &
CEMENTED
MINERAL
OIL
BASE
MUD
EXPECTED
MUD
WEIGHT
9.5 PPG
RECEIVED
I
JU~ i3 1995'
A,~asKa Oii& Gas Cuns. GommissioF,
Anchor~.. ?
MIDDLE GROUND SHOAL A34-11LS
DRILLING FLUID PROGRAM
The 6" hole will be drilled using an oil base mud. The
anticipated mud weight is 9.5 ppg.
EXPECTED PRESSURES
The maximum expected pressure gradient is 0.455 psi/ft. The
maximum expected bottom hole pressure is 4,603 psi at 10,116'TVD.
The expected maximum surface pressure with an oil fluid column
and the well shut in is 928 psi.
CASING PROGRAM
A 6" hole will be drilled out of the existing 7" casing to TD.
5" 18#/ft N80 flushjoint liner will be run to TD and hung at
approximately 8,100'MD. The production liner will be perforated.
A
RECEIVED
dUN ! ~ 1995
A!aska Oil & Gas Cons. Commission
Anchor~..~
10.
11.
DESCRIPTION SUMMARY OF PROPOSAL
MIDDLE GROUND SHOAL
A34-11LS
1. Move to A34-11 (leg 1, conductor 4) and rig up.
2. Kill well.
3. Nipple up 5,000 psi BOP stack and test.
4. Pull tubing and packer completion equipment.
5. GIH with bit and scraper and clean out to plug back TD
at 8,108'. Drill cement to 8,350'.
6. Set whipstock at 8,350'MD and sidetrack.
7. Directional drill to ll,599'MD-KB using a 6" hole. Final
hole angle will be 50 degrees in a SSOW direction.
8. Log.
9. Run a 5" production liner to TD and hang off at
8,100'MD-KB. Cement liner.
Perforate.
Run packer and tubing. (Packer at approximately
7,400'MD.)
Oil & Gas 6ons. Anchor,."
Anadril 1 Schlumberger
Alaska District
1111 East 80th Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 349-2487
DIRECTIONAL WELL PLAN for SHELL WESTERN E & P INC
Well ......... : A34-11LS (P1)
Field ........ : MIDDLE GROUND SHOAL
Computation..: MINIMUM CURVATURE
Units ........ : FEET
Surface Lat..: 60.79578222 N
Surface Long.: 151.49586138 W
LOCATIONS - ALASKA Zone: 4
Legal Description X-Coord Y-Coord
Surface ...... : 1624 FSL 430 FEL Sll T08N R13W SM 232787.31 2485842.24
Tie-in/KOP...: 137 FSL 1984 FEL Sll T08N R13W SM 231200.58 2484391.03
Target ....... : 4879 FSL 2026 FEL S14 T08N R13W SM 231146.61 2483854.15
BHL .......... : 3839 FSL 3281 FEL S14 T08N R13W SM 229868.26 2482843.03
PROPOSED WELL PROFILE
STATION
IDENTIFICATION
TIE-IN CURVE 7.1/100 8303 15.51
END CURVE #1
CURV~~, ~2 7.1/100
~ ¢-- 8800 28 09
· ~ ~ F--~ 8900 27.65
% ·
...._..~ ~ ~ 9000 28 87
~'. -~ O~ ~, 9100 31.54
~ 92oo 35 3s
'J~ ~ '
~ ~ CD 9300 39.9s
5' 9400 45.11
.5' 9500 50.64
END CURVE #2 9514 51.42
Prepared ..... : 05/23/95'--
Section at...: 230.35
KB elevation.: 116.00 ft
Magnetic Dcln: 22.636 E
Scale Factor.: 0.99998125;
Convergence..: -1.30578767
ANADRI[[ AKA-DPC
FEASIBILITY PLAN
NOT APPROVED FOR
EXECUTION
PLAN
MEAS INCLN DIRECTION VERT-DEPTHS SECT RELATIVE-COORDINATES STATE-PLANE TOOL DL/
DEPTH ANGLE AZIMUTH BKB suB-s DIST FROM-THE-WELLHEAD X Y FACE 100
166.81 7795 7679 2145 1487.01 S 1553.28 W 231200.58 2484391.03 39L <TIE
8400 21 31 154 87 7887 7771 2155 1515 64 S 1542 82 W 231210 38 2484362.18 27L 7.10 O
8500 27.79 147.84 7978 7862 2163 1551.87 S 1522.67 W 231233.42 231229.70 2484319.37 2484325.50 21L 7.10(7 10
8515 28.80 147.04 7991 7875 2164 1557.92 S 1518.81 W - `M-!~
8756 28.80 147.04 8202 8086 2177 1655.12 S 1455.78 W 231294.22 2484220.75 106R 0.00
153.49 8241 8'125 2181 1673.43 S 1445.30 W 231304.27 2484202.21 100R 7.10 ~N
168.68 8329 8213 2197 1717.31 S 1430.22 W 231318.35 2484158.00 87R 7.10 ~
183.49 8417 8301 2225 1764.22 S 1427.13 W 231320.37 2484111.03 74R 7.10 C
196.59 8504 8388 2263 1813.45 S 1436.08 W 231310.30 2484062.02 62R 7.10
207.50 8587 8471 2311 1864.24 S 1456.94 W 231288.30 2484011.72 53R 7.10
216.37 8667 8551 2369 1915.81 S 1489.37 W 231254.69 2483960.90 46R 7.10
223.60 8740 8624 2436 1967.38 S 1532.90 W 231210.01 2483910.34 41R 7.10
229.61 8807 8691 2510 2018.15 S 1586.84 W 231154.92 2483860.81 37R 7.10
230.35 8816 8700 2520 2025.00 S 1595.00 W 231146.61 2483854.15 7.10
A34-11LS (P1)
05/23/95 Page 2
PROPOSED WELL PROFILE
STATION
IDENTIFICATION
MEAS INCLN DIRECTION VERT-DEPTHS SECT RELATIVE-COORDINATES STATE-PLANE
DEPTH ANGLE AZIMUTI{ BKB SUB-S DIST FROM-THE-WELLHEAD X Y
TARGET ~1 9514 51.42 230.35 8816 8700 2520 2025.00 S 1595.00 W 231146.61 2483854.15
TARGET g2 11599 51.42 230.35 10116 10000 4150 3065.00 S 2850.00 W 229868.26 2482843.03
TI) ' 11599 51.42 230.35 10~16 10000 4150 3065.00 S. 2850.00 W 2298~8.26 2482843.03
TOOn DL/
F~CE 100
7.10
0.00
0o00
AI",I^.Pg'L L
AKA-DPC
FEASIBILITY PLAN
NOT' APPROVED FOR
EXECUTION
PLAN .~ ~( ~ ~
0
,.~
C
L_
_
iiiii l! i [ Il __ I I ~ I
A34-t tLS
PLAN VlE~
CLOSURE
il' q]OD r~JeT, dC A/IIIIULII ,,"dr'.'Jr' .......... · ---,
DECLI IATIDN ' 22.636 E " ' : J
SCALE ' 1 inch = 600 feet t ' J . KB
DRAWN · '05/23/95 i · I 7' --'
Maekee ]dent i f ~cat ~on MD N/S E/~ ................
A) TIE-IN CURVE 7 I/lO0 8303 ~487 ]553
B) END C~VE ~ 8515 ~558 15~9
C) C~VE t2 7, ~/~00 8756 1655 ~456
D) END C~VE t2 9514 2025 1595 .- ,
E) TARGET It ........... 95~4 2025 J595
F) TARGET f2 ........... ~599 3065 ~850 / ·
Gl TD 1~599 3065 2850 ,
-- ~ ~/ ·
,
.........
I
AN~',bRILL " AKA'~PC ...... ',. --
~:EAS BILI~Y F'LAN
N4DT/~PPR'OVED FC R
E;(ECLJTION
I
,, ,
5100 4800 4500 4200 3900 3600 3300 3000 2700 2400 2~00 ~800 ~500 1200 nnn ~nn ~nn a 300
<- WEST ' EASI ->
0
.y-31-95 12:50P Anadrill ~u/ J** ~zuv r.v~
[ S HELL WESTERN - S P INC
,, A34-
6800 ·
', VERTICAL SECTION VIEW
7000 ....................
, Section at: 230.35
' TVD Scale · 1 ~n£h : 400 feet
72oo ,, Dep Sca]e· 1 inch : 400 feet
' Drawn · 05/23/95
' I
7400 ....... ~ " -~ -
, Anadri ]] Schlumberger
' : Harker Identification HO BKB SECTN INCLN
7600 ~ "
; A) TIE-IN CURVE 7.1/100 8303 7795 2145 t5.51
~ B) ENO CURVE ~! 8515 7991 2164 28.80
~, {,, C) CURVE #2 7. i/tOO 8756 8202 2177 28.80
7800 A ~ .... I -- - D) END CURVE ~2 9514 8816 2520 51.42
I
E) TARGET #1 9514 8816 2520 5t.42
I F) TARGET I2 11599 10116 4150 51.42
B
i
G) TD 11599 10116 4t50 51.42
K 8000 D-- ..
B
8eoo ................. --c -!L ....... /NADR LL ,,~i<'
8400 i ,
i NO! AP >ROVED ;OK,
8600 ............ , ........
,,
I
I
8800 ,' B '~ '
I
9 0 O0 ...........
! .
!
9~oo ; i
i REC£1\ ED
9400 ..... , ....... ~ ...........
I ,
,
· , t,a ~_ aoe ¢..nra. r, ommi~sion
9600 '
~ ''% Anchorz;
, ,
9800 .... ~ ...............
10o00 ~ ; j "~ . '
10200 .... I ............
1600 lBO0 2000 2200 2400 2600 2800 3000 3200 3400 3600 380¢ 4000 4200 4400
Sect ion Departure
{~naUril] [c)93 A]41ILSt fl! ~,~ 2'2f; ~w () , -
iy-31-95 12:50P Anadrill 907 344 216o
A34-:Ili S (Pi)
....... " ISect~on at: 230.35
, .... 1 I ITVD Scale.: ~inch = ~._~0_0_ tee!
II
:, ] JDep Scale.: _~.n_c_h._= 1200 feet
!
:': .... i ...... ' AnadrJ ] ]$ch]umberger
Marker Identificati0n MD ' BKB SECIN INCLN
' A) lIE-IN CURVE 7.1/100 8303 77§5 2145 15.51
~ B) END CURVE #1 8515 7991 2164 28.80
·
'~ C] CURVE #2 7.1/100 8756 8202 2177 28.80
...... -~ ......... D) ENO CURVE #2 9514 8816 2520 51 42
~ ,
'~ El TARGET ~1 9514 8816 2520 5t.42
, FI TARGET ~2 ........... 11599 10116 4150 51.42
%
· Gl ID 11599 10116 4150 51.42
%%~ ....................................
! i ~l I I11 ,
,, Ar',IADRIL L , AKI:'-DPC
', ' FEA:~IBIL~ITY PLAN
..... '" ........ [ ..... I',,IOT-AP PI~OV ED F-;:~'R .....
,, EXECUTI()N
% =,
',, PLAN :~ ~ J- ~,_ ~
%
% ·
%
%
/
............... ! ...............-
!
A)~ ¢~a 0i~ &,,,,,,h,,~;Gas Cons., 6ommis
......................... - .. ~u
. _ --
,
0 600 i200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800
Sect ion Departure
.y-31-95 12:51P Anadrill
A] TIE-IN 8303 1487 1553
PLAN VIEW ~1END CURVE #1 8515 1558 1519
CURVE 12 7.1/100 8756 1655 1456
,,, DJ ENO CURVE 12 9514 2025
CLOSURE ' 4185 feet at Azimuth 222 92 El TARGET l1 9514 ~25 1595
' F] TARGET ~2 11599 3065 2850
DECLINATION.' 22.636 E G) ID ~1599 3065 2850
SCALE ' ~ inch = 300 feet
DRAWN '05/23/95
AnadrJ]] Schlumberger
i
12oo ~ I J ,
. ,
1350 ............................. ~ ..........
I
m1500 ~
~, FE~SIBLI~~ PLaN
moo Nih'' A DDD~'~/~
EXECUTION .
/
I
...... ~ L~,~. ~>
22~0 .................
2~00 ~ -
2550 ....................
I
~7oo ~ .
3000 ] I:~
~9~ ~a Oil & ~as ~ons. 6ommlss'
. /,nchor[: ,-
~,~o ............................
~oo I , ~ -
3300 3J50 3000 2850 2700 2550 2400 2250 2]00 1950 1800 ~650 1500
<- WEST
Shell Western E&P Inc.
An affiliate of Shell Oil Company
P. O. Box 576
Houston, TX 77001
June 7,1995
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Gentlemen:
SUBJECT:
SUBMISSION OF FORM 10-401 -APPLICATION FOR PERMIT TO
DRILL MIDDLE GROUND SHOAL LATERAL DRAINHOLE
WELL NO. A34-11LS
Enclosed, in triplicate, is the Application for Permit to Drill a lateral drainhole from Middle
Ground Shoal Well No. A34-1t (APl No. 10084-01). The lateral drainhole will be named
A34-11LS. Operations are scheduled to begin approximately June 20, 1995.
Note that the A34-11LS lateral will be the third oil completion in the northwest quarter section
of Section 14, T8N, R13W. SWEPI hereby requests a variance from Rule 1 (b) of Conserva-
tion Order ~f44 by way of Administrative Approval (Rule 6).
If you have any questions or wish to discuss, please call Jeff Wahleithner at (713) 544-3344
or Bert Coxe at (713) 544-2235.
Sincerely,
· S. Nady
Manager - Asset Administration
Western Asset
Enclosures
AK401.DOC- I
RECEIVED
Alaska 0il & I~as Cons. C0mmissJ0rl
,gnchora~:~.?
SHELL MINIMUM BOP
STACK REQUIREMENTS
M~n, Mm,
No II~m I.D, Nominal
'"{ FIo~lin~ --'~ ....
2 Drilling Nipple
4 '~,nRul:,r
,~ Two iingle pt one du~l hydr'u~lic'~F~y
o~r~led rams
6 Otillin9 spool wilh 2" ~nd 3"
...............
7 Gal~ Valve 3 1/8"
"~: G~, v~l,,po~,~Omr~d '3 i/~" ' .......
......
0 Gale Valve 2'1/16"
i( CH~ck"g~ ...... ~..i).lG,,, .........
,ii-- ~;'ing Spool ........
...........
....
17 Kill lin~ Io rig mud pump manifold 2"
~8 :':""~ :"x :"~',o,, ...... l t ----
OPTIONAL
Wear Ilang~ or bo~e prOteClOr
L~ne lo rna~lsi~,J~ co,~r,ectlon
J~Otal~,~g I]lOwOul i)r~vCnlc~
Gate valve power operated
RECEIVED
..
jUN 1 3 !995
Oil & Gas Co~s. Commission
Anchor~"
DRAWING & CHECK LiST 104A
SHELL CLASS 5M
SURFACE IN'STALLATIONS NORMAL
AIR/GAS"
FOR AIR/GAS DR.ILLING
Q. I
CONFIGURATION A
ANNULAR PREVENTER
BLIND RAM
PIPE RAM
- _
HOLE 5000 PSI STACK
TOP OF DERRICK FLOOR
BOTTOM OF ROTARY BEAI~ ; u__']
!NIPPLE
FILL UP lINE
2-~/~6- K3LL UNZ ~ ~
RIG CELLAJR FLOOR
ANNULAR
PREVENTER
5000 PS[
13-5/8° 5000 PSI FI_.AbiGE
BUND R_AJ4 SOO0 PS1
PiPE RA]4 5000 PSI
DI:LILL 3 - t/8- CHOKE LINE
,, t3-5/8' 5000 PSI FIJJNGE
'~_.
I
ROOk{ FLOOR
50OO
PSI
RLSER
13-5/8' 5000 PSI FI.iNCE
DSA
'?'
SPOOL
HF_.XD
Shell Western E&P Inc.
Platform "A"
Solids Control/l~/iud System
Desilter 16 Cone
Sand
Derrick
Shakers
Derrick
Shakers
To Mu~p
Trap
To De~asser '~ _
umps
To
Mu~pumps
To De~asser
IDegasser
Mixers
Si lEI_I_ WESTERN E&P INC.
MIDDLE GROUND SHOAL FIELD
I J' .5 KSI LINES
2. CIIOSS 3' X 3' X 3' X 3' 5 KSi
3 CiIOSS 3" X 3' X 3' X 3' X 3' 5 KSI
-1 3' 5 KSI GAI'E VALVE
5. ADJUSTABLE .MANUAL CttOKE - 3' 5 KSI
~ REMOTE OPERAYED Ct-iOKE -
2-9/16' 10KSI ttYDRAULIC ADJUS'rABLE
r. PlriESStiRE GAGE
]. 4' LINES
;). MIlD/GAS SEPAIIA1FOR
3. 6' I_IHE
INLET ..-~
PLATFORM "A"
CIIOKE MAN[ FOLD
VENTED Ar CltOW
./
~ STATE OF ALASKA O~A
ALASKA OIL AND GAS CONSERVATION C ISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
OIL)(_ GAS :~; SUSPENDED "~ ABANDONED [] SERVICE
2. Name of Operator
Shell Western E&P ][nc.
3. Address
601 W. 5th Avenue Suite 920 Anchnragp~ AK 9950]
,. Locat,on of we~l at surface Platform "A", Leg 1, Conductor 4 @ 1627'N &
435'W from SE corner of Section 11, T8N, R13W, S.M.
At Top Producing interval
I@ 7590" 342'N & 1987'W from SE corner of Sec. 11, T8N, R13W,S
At Total Depth
i@ 10330' 83'S & 1832'W from SE corner nf .qmc. 11 ~. TRN; R13W; S
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
. 116' KB : ADL 18754
Date Reached 14. Date Comp., Susp. or Aband.
12. Date Spudded 13. T.D.
, 1117/84 12/]7/84 3/27/85
17~--F(~t~l'Depth (MD+TVD) 18.PlugBackDepth(MD+l-VD) 19. Directional Survey
i10330' - 9793' 8108' - 7607' YES~ NOI2
22. Type or Logs
Electric
Other
Run
N/A
23.
I CASING SIZE WT. PER FT. GRADE
7" 29
Classification of Sdf'q~ce Well
! s,,, la7 / 93-~2 / 93-294 '
Number '
~u-733-10~RA-fll
9. Unit or Lease Name
Middle grnund Shnal
10. Well Number
4 A34'11
11. Field and Pool
, ,
HGS E,-'F, & G
~ter Depth, if offs :ompletions
feet
SSS~
feet
CASING, LINER AND CEMENTING RE )RD
SETTING DEPTH MD
TOP BOTTOM
0
I.7" 29 Lz80 I
24. Perforations open to Production (MD+TVD of Top and Bottom
interval, size and number)
!Pool MD TVD Size JSPF
"E" 7590'-7613' 7110'-7132' * 6
"F" 7962' -8010' 7466' -7513' * 6
* = 2-1/8" Enerjet
HOLE SIZE lNG REC~ D AMOUNT PULLED
9885' to
DEPTH SET (MD)
7452'
26.
DEPTH INTERVAL (MD)
lanced Cement Plug
IPACKER SET (MD)
7406'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.'
B108' - 9885'
AMOUNT & KIND OF MATERIAL USED
alanced Cement Plug.
27. ~ PRODUCTION TEST
Date First Production
11/19/93
Date of Test Hours Tested
11/27/93 12
Flow Tubing Casing Pressure
Press-100 455
28.
IMethod of Operation {Flowing, gas lift, etc.)
Gas Lift
TEST PERIOD I~ 174 136
~t ~)~jLRAF~AE ~- E I~ OIL-BBL348 GAS-MCF.272
CORE DATA
WATER-BBL
46
WATER-BBL
92
ICHOKE SIZE IGAS'OIL RATIO
,N/A . I 783
OIL GRAVITY-APl (corr)
34.7
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
-- Development Well Recompletion-- RECEIVED'
DEC 0 t993
Alaska 0il & Gas Cons. C0mmissi0,
Anch0rag~
Form 10-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplicate
APPLICATION FOR SUNDRY APPROVAL ' ,
1. Type of Request: Abandon __ Suspend__ Operation shutdown __ Re-enter suspended'~el~.,,,
Alter casing __ Repair Well __ Plugging__ Time extension __ Stimulate
Change approved program X Pull tubing Variance .. Perforate Other '
5' Jype ot Well: 6. Datum elevation,(DF o~
2. Name of Operator Shell Western E&P Inc. Development 116 KB ~,eet
3. Address 601 West 5th Avenue, Suite 800 Exploratory 7. Unit or Property name
Anchorage, AK 99501 Stratigraphic ~ Middle Ground Shoal
Service X 8. Well numUer
4. Location of well at Platform "A", Leg 1, Conductor 4 @ 1627' N & 435' W from SE A34-11
surface corner of Sec. 11, T8N, R13W, S.M. 9. Permit number
At top of productive (Proposed) (7590') 342' N & 1937'W from SE corner of Sec. 11, 84-187 /93-:[ 62
interval T8N, R13W, S.M. 10. APl number
At effective depth 50-733-10084-01
(10,325') 149' S & 1833' W from SE corner of Sec. 11, TSN, R13W, 11. Field/Pool
At total depth S.M. "E,..F, &G".~'ool
12. Present well condition summary //")
Total depth' measured 10,325' feet Plugs(measured)
true vertical 9,788' feet
·
Effective depth: measured 10,242' feet Junk (measured)
true vertical 9,705' feet
Casing Length Size Cemented Measured depth True vedical depth
Structural
Conductor
Surface 1,644' 13-3/8" 54.5#,J-55 1900 sx 1644'
Intermediate 6747' 9-5/8" 43.5-47#, N-80 1100 sx 6747'
Production
Liner 3898' 7" 29#, L-80 2200sx 6427'-1o,32.~ E ~ ~ I V F D
Perforation depth: measured 8310'-9640'; 10 Intervals; see attached current wellbore diagram
true vertical 7802'-9106' OCT 2 8 3993
Tubing (size, grade, and measured depth) 2-7/8", 6.5#, 8rd EUE & BTC @ 7452' Alaska 0JJ & Gas Cons. C0mmissio~
Anchorage
Packers and SSSV (type and measured depth) Baker "DB" Permanent Packer @ 7406'MD 6934' TVD
13. Attachments Description summary of proposal X_~ Detailed operations program __ BOP sketch
14. Estimated date for commencing operation '~0/f~':~/~l:~ 11/06/93.., 15. Status of well classification as:
Oil X Gas Suspended
16. If proposal was verbally approved __ m
Service
Na'me of approver Date approved
17. I her~y~rtify th~,t the foregoing is true and correct to the best of my knowledge
Signed[,.,.. --~.~--q ~-~..~- Title Staff Production Engineer Date I b/~w
FoR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness I Approval No. _
Plug integrity.__ BOP Test__ Location clearance__I ?~' '"
Mechanical Integrity Test__ Subsequent form required 10-
Original Signed 13y
Approved by order of the Commission DaVid W. Johnston Commissioner Date / f/R
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
WELL PERMIT CHECKLIST
GEOL AREA ~',,~....-(:~ UNIT#
PROGRAM: exp [] dev [] redrll~ serv []
.,~,~,,/., .,~. ON/OFF SHORE O~
ADMINISTRATION
1.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Permit fee attached ...................
Lease number appropriate ...............
Unique well name and number ..............
Well located in a defined pool .............
Well located proper distance from drlg unit boundary..
Well located proper distance from other wells .....
Sufficient acreage available in drilling unit .....
If deviated, is wellbore plat included ........
Operator only affected party ..............
Operator has appropriate bond in force .........
Permit can be issued without conservation order ....
Permit can be issued without administrative approval...Y
permit be approved before 15-day wait ....... ~Y~
Can
N
N
N
N
N
N
N
N
N
N
ENGINEERING
Conductor string provided ................ Y
Surface casing protects all known USDWs ......... Y
CMT vol adequate to circulate on conductor & surf csg.. Y
CMT vol adequate to tie-in long string to surf csg . . . Y
14. N
15. N
16. N
17. N
18. CMT will cover all known productive horizons ...... ~ N
19. Casing designs adequate for C, T, B & permafrost .... ~ N
20. Adequate tankage or reserve pit ............. { N
21. If a re-drill, has a 10-403 for abndnmnt been approved. N
22. Adequate wellbore separation proposed .......... N
23. If diverter required, is it adequate ...........
24. Drilling fluid program schematic & equip list adequate ~ N
25. BOPEs adequate ..................... ~ N
26. BOPE press rating adequate; test to $ 6F~ psig.~
N
27. Choke manifold complies w/API RP-53 (May 84) .......
28. Work will occur without operation shutdown ....... ~ N
29. Is presence of H2S gas probable ............ Y~ N
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures .... Y
31. Data presented on potential overpressure zones .. .... Y/N
32. Seismic analysis 9f shallow gas zones ..........
33. Seabed condition survey (if off-shore) ........ / Y N
34. Contact name/phone for weekly progress reports . . ~/ . Y N
[exploratory only]
GEOLOGY: ENGINEERING:
BEW
COMMISSION:
DWJ~
Cc~ments/Instructions:
HOW/lo - A:~FORMStcheklist rev 03/94
..