Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout195-080Debra Oudean Hilcorp Alaska, LLC
AK_GeoTech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
HIh„rp:lla.kn,MA: Fax: 907 777-8510
E-mail: doudean@hilcorp.com
DATE: 3/26/2019
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Ste 100
Anchorage, AK 99501
RECEIVE
MAR 2 8 2019
AOGCC
IPROF
CD: HALLIBURTON 30 DEC 2018
Injecting - Up 40 fpm
7111(20119 3:41 PM
LAS File
Injecting - Up 80 fpm
Z/11/2019 3:41 PM
LAS Fife
Injecting - Up 128 fpm
2/1 112019 3:41 PIA
LAS File
o MPL-16i_IPROF_30DEC13
2/11/2019 3:41 PM
PDF Document
Cl MPL-16i_IPR0F_30DEC18_img
2/11/2019 3:41 PM
TIFF File
Injecting - Down 40 fpm
2/11/2019 3:41 PM
LAS File
Injecting - Down 80 fpm
2/11/2019 3:41 PM
LAS File
Injecting - Down 120 fpm
2/11/2019 3:41 PM
LAS Fife
Please include current contact information if different from above.
19 50 80
30516
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Received By: I \ I J V /i f I Date:
Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
/~_'_~)' File Number of Well History File
PAGES TO DELETE Complete
RESCAN
[] Color items - Pages:
Grayscale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original - Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
[] Logs of various kinds
[] Other
COMMENTS:
Scanned by: Bevedy Diann(~~Nathan Lowell
/si
[] TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is/
MATERIAL
UND_ER TInS COVER nAS BEEN_
ON OR BEFORE
W
PL DER
MATE IA L UN --
T H iS M A R K E R
c:LOKIkMI~iLM.DOC -
PLUGGI_,~G & LOCATION CTI~-~A.~CE REPORT
W'e i !
Review "~h~e well file. and.-c.~,~,,,u on pluqcjinq, well head
scaCus !oca~icn c! '.e clear, code.
.~arkar pos= or p!aCa:
Locaclon Clearance:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION Plugbackfor Sidetrack
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [--I Suspended [~ Abandoned I--I Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 95-80 399-150
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22566
4. Location of well at surface ?~-~-.,~.~ .... 9. Unit or Lease Name
3604' NSL, 5148' WEL, SEC. 8, T13N, R10E~'-~'~¢~'¢~'~;~'~. . '-,. Milne Point Unit
At top of productive interval ~'~'-'/~ !' ', 10. Well Number
2285' NSL, 1587' W EL, SEC. 33, T14N, R10E ~~.! M PL-16i
~'"~ "'~~ i 11. Field and Pool
At total depth
2479' NSL, 1399' WEL, SEC. 33, T14N, R10E Milne Point Unit/Kuparuk River
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands
KBE = 49.8'I ADL 355017
17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD>I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
15910 7716 FTI 15779 7613 FTI I--lYes []No N/A MD 1800' (Approx.)
22. Type Electric or Other Logs Run
Gyro, MWD, LWD, SBT/GR/CCI_/CBL, GR/RES/NEU/DEN
23. CASING~ LINER AND CEMENTING RECORD
CASING SE'FI-lNG DEPTH HOLE
SiZE WT. PER FT, GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91# NT80LHE 38' 80' 30" ;'50 sx Arctic Set I (Approx.)
9-5/8" 40# L-80 36' 9048' 12-1/4" 1740 sx PF 'E', 250 sx 'G', 132 sx PF 'E'
7" 26# L-80 33' 15867' 8-1/2" 275 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and i25. TUBING RE88~B
Bottom and interval, size and number) S~ZE DEPTH SET (MD) PAC~h,~D)
None 3-1/2", L-80 10450'- 15382' 15280' & 15362'
MD TVD MD TVD
26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10450' Set Bridge Plug
15298' P&A with 44 Bbls Class 'G', Sqzd to 1485 psi
10200' K/O Plug, 17 Bbls Class 'G', Sqzd to 800 psi
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.) ' [ i~/-~ L
Not on Production! N/A
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATE OIL-BEE GAS-MCF WATER-DEL OIL GRAVITY-APl (CORE)
Press. D 24-HOUR
28. RATE CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered and
Marker Name
Depth Depth gravity, GOR, and time of each phase.
(Subsea)
Top Kuparuk 'A' 15473' 7322'
Top Kuparuk A3 15484' 7331'
Top Kuparuk A2 15507' 7349'
Top Kuparuk A1 15546' 7379'
31. List of Attachments
Summary of Daily Drilling Reports
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble ,~r~'~ ~,~~ Title Technical Assistant III Date I)' '~0' ??
MPL-16i 95-80 399-150 Prepared By Name/Number: Terrie Hubb/e, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
To: Anchorage Producti¢ --ngineering . ~,cation: Prudhoe Bay
From: Kirby Walker Date: August 14-17, 1999
Operation: MPU L-16i Cost Code: 337158- xxx
Job Id: 9335- 070 - xxx Detail Code: CTSDTRK / Prep / etc.
Summary
8/14 - MIRU Dowell unit #5. MU cementing BHA. Attempt to kill well by pumping seawater -see no pressure decrease. S/D and RIH
with WHP ~1,500 psi. Tag bottom at 15,771'. PUH and flag pipe at 15,200' for tubing punch depth correlation. Begin bullheading 17
bbls cement (described below) with 3 bbl fresh water spacers ahead and behind followed by seawater displacement. The choke had
to be continually opened (1,100 psi - 800 psi) to keep positive returns. Attempt to squeeze by closing choke and note pressure to
build to 1,400 psi and drop back to 1,250 and build again to 1,375 psi. POOH to safe depth (14,800'). Pump 15 bbls of Biozan and
follow with seawater to jet tubing. With Biozan at nozzle jet down to 15,300'. Make additional pass up to 15,200' and back to
15,300'. POOH jetting. (Returns contain some oil.) WHP rose 300 psi from beginning of jetting to on surface with coil. Leave well
SI w/1,233 psi.
8/15- Attempt to bleed pressure from well - got fluid returns with no gas- would not bleed down. Attempt to pressure up to 1,500
psi. Would not pressure up- obtained injectivity. Call for more cement. MU BHA #1 and RIH. Tag cement at 15,541' - not too solid.
Perform injectivity test- pressure seemed to increase with more fluid regardless of rate. Decide to circulate cement down and lay in
holding -1,200 psi on the choke. Pump 12 bbl of cement and displace with seawater. Keep steady back-pressure throughout
placement of cement. Pull to safe depth and slowly pump away 2 bbl of cement- allow to sit for 30 minutes. Inject an additional bbl
squeezing to 1,485 psi. Drop ball and start Biozan. Circulated to nozzle holding 500 psi on choke so as not to inject more cement.
Make 4 passes from 15,150' - 15,350' jetting Biozan. POOH jetting - keeping 500 psi on choke. On surface with coil. MU tubing
punch. Open well and find WHP at 1,250 psi. Obtain injectivity- call town for next step. SI well and RDFN.
8/16- MU cementing nozzle and RIH. Tag up at 7,768' on soft fill- cement. Call for motor and mill. Make some progress and get to
7,802'. Can go no further- POOH and wait for motor. MU motor assembly and RIH. Tag cement at 7,802' and begin milling. Mill
green cement for the first ~300' - continue RIH seeing no major mill work. Mill to tubing tail S/D pump. Tag TOC at 15,500'. POOH.
MU cementing BHA and RIH. Mix and pump 15.3 bbl of cement with 3 bbl freshwater spacer ahead. Lay in cement 1 for 1 and pull
to safe depth of 13,750'. Squeeze four times over the next three hours to 1,300 psi- 5.3 bbl of cement. 8/17 Drop ball and begin
pumping Biozan to contaminate cement keeping 1,000 psi on choke. Make four passes from 15,300'-15,100' jetting Biozan. POOH
jetting. On surface with coil- RDFN.
Return to location and MU BHA #2. Pressure test plug to 1,500 psi and hold for 35 minutes (record for state). RIH and tag TOC at
15,298'. PUll to 15,150', drop ball and fire tubing punch. Verify holes by pressuring up on tubing and noting pressure increase
on IA. POOH leaving voidage. Have HB&R freeze protect. RDMO Dowell.
Facility
M Pt L Pad
Progress Report
Well MPL- 16A Page 1
Rig Nabors 4ES Date 08 September99
Date/Time
22 Aug 99
23 Aug 99
01:00-06:00
01:00-06:00
06:00
06:00-13:00
13:00-16:00
13:00-16:00
16:00
16:00-18:00
16:00-18:00
18:00
18:00-19:30
18:00-19:30
19:30
19:30-23:00
19:30-23:00
23:00
23:00-02:00
23:00-02:00
02:00
02:00-03:00
02:00-03:00
03:00
03:00-06:00
03:00-06:00
06:00
06:00-19:00
06:00-07:00
07:00
07:00-08:00
08:00
08:00-10:00
10:00
10:00-11:00
11:00
11:00-19:00
19:00
19:00-19:30
19:00-19:30
19:30
19:30-20:00
19:30-20:00
20:00
20:00-06:00
20:00-20:30
20:30
Duration
5hr
5hr
7hr
3hr
3hr
2hr
2hr
1-1/2 hr
1-1/2 hr
3-1/2 hr
3-1/2 hr
3hr
3hr
lhr
1 hr
3hr
3hr
13hr
lhr
lhr
2hr
lhr
8hr
1/2 hr
1/2 hr
Activity
Move rig
Rig moved 25.00 %
MOVE RIG F/MPK-13 TO MPL-16 25% MOVED DERRICK &
SUBSTRUCTURE ON LOCATION.
Rig off station
Move rig (cont...)
Wellhead work
Removed Hanger plug
Equipment work completed
Well control
Bleed down well
Completed operations
Wellhead work
Rigged down Xmas tree
Equipment work completed
Nipple up BOP stack
Installed BOP stack
Equipment work completed
Test well control equipment
Tested BOP stack
Pressure test completed successfully - 3500.000 psi
test waived by John Spaulding
Wellhead work
Retrieved Hanger plug
Equipment work completed
Pull Tubing, 3-1/2in O.D.
Laid down 1665.0 ft of Tubing
rig floor & mu landing jt. & pull hanger & begin
laying dn tbg.
Stopped: To hold safety meeting
crew change
Pull Tubing, 3-1/2in O.D. (cont...)
Laid down 2450.0 ft of Tubing
78 joints laid out
Pulled Tubing in stands to 10450.0 ft
D1 Drill; OS-1:30 min
Stopped: To circulate
Circulated at 10450.0 ft
Hole displaced with Water - 120.00 % displaced
Serviced Block line
Slip & cut line. Service rig equipment.
Line slipped and cut
Laid down 10450.0 fl of Tubing
At Surface: 0.0 ft
Perform integrity test
Tested Casing
Test 7" casing & cement plug.
Pressure test completed successfully - 3500.000 psi
Wellhead work
Installed Wear bushing
Eqpt. work completed, running tool retrieved
3-1/2in. Drillpipe workstring run
Rigged up Drillstring handling equipment
Work completed - Drillstring handling equipment in position
Facility
M Pt L Pad
Progress Report
Well MPL- 16A Page 2
Rig Nabors 4ES Date 08 September 99
Date/Time
24 Aug 99
20:30-21:00
21:00
21:00-06:00
06:00
06:00-21:00
06:00-06:45
06:45
06:45-07:45
07:45
07:45-13:45
13:45
13:45-14:30
14:30
14:30-15:45
15:45
15:45-21:00
21:00
21:00-06:00
21:00-00:00
25 Aug 99 00:00
00:00-04:00
04:00
04:00-06:00
06:00
06:00-06:00
06:00-06:45
06:45
06:45-10:00
10:00
10:00-13:30
Duration
1/2 hr
9hr
15hr
3/4 hr
lhr
6hr
3/4 hr
1-1/4 hr
5-1/4 hr
9hr
3hr
4hr
2hr
24 hr
3/4 hr
3-1/4 hr
3-1/2 hr
Activity
Installed Bridge plug
PU 7" EZSV.
Equipment work completed
Singled in drill pipe to 10000.0 ft
Fire Drill; OS-1 min.
Stopped: To hold safety meeting
3-1/2in. Drillpipe workstring run (cont...)
Singled in drill pipe to 10450.0 ft
At Setting depth: 10450.0 ft
Functioned Bridge plug
Set HES EZ Drill plug & test to 2000 psi. &
Equipment work completed
Circulated at 10450.0 ft
Take on 9.2 Ppg. mud & displace well bore fluids
with same @ 5-bpm 2000 psi. & mix 18.0 ppg. plug &
spot from 10450' to 10250'
Hole displaced with Water based mud - 105.00 % displaced
Pulled out of hole to 9931.0 ft
Stopped: To circulate
Circulated at 9931.0 ft
circ. bottoms up & monitor pressure
Hole displaced with Water based mud - 100.00 % displaced
Pulled Drillpipe in stands to 0.0 ft
Completed operations
BHA run no. 2
Made up BHA no. 2
Make up Section mill & Attempt to Run in hole
unable due to csg. hanger possible 29# impression on
mill indicate so. take to shop & dress down I. D. &
all ok.
BHA no. 2 made up
R.I.H. to 10195.0 ft
section mill starting depth.
At Top of new hole section: 10195.0 ft
Circulated at 10195.0 ft
circ. & cond. fluids & attempt to find collar with
section mill unable.
Stopped: To hold safety meeting
crew change.
BHA run no. 2 (cont...)
Cut Casing at 10184.0 ft
set section mill & cut 7" csg. (well bore began
taking fluid
Began precautionary measures
Circulated at 10184.0 ft
loosing app.40-60 bbl. per. hr. circ. lcm & shut
well in & check pressures SIDP =280 SICP= 300 psi.
& bleed well dn to static with 3-bbl. gain.
Began precautionary measures
To change to circ. out through choke
Circulated at 10184.0 ft
Circ. well bore out through full open choke @
different rates mostly 22-spin =1.3 bpm. & 1500 drill
pipe pressure loss while pumping out = 9-bbl.
Facility M Pt L Pad
Date/Time
13:30
13:30-15:30
Duration
2hr
15:30
15:30-19:00
3-1/2 hr
19:00
19:00-22:30
3-1/2 hr
22:30
22:30-02:30
4hr
26 Aug 99 02:30
02:30-06:00
3-1/2 hr
06:00
06:00-06:00
06:00-10:00
24 hr
4hr
10:00
10:00-11:00
11:00
11:00-15:00
lhr
4hr
15:00
15:00-18:00
3hr
18:00
18:00-20:00
2hr
20:00
20:00-20:30
1/2 hr
Progress Report
Well MPL- 16A Page 3
Rig Nabors 4ES Date 08 September99
Activity
Slow circulation rates completed
shut in well. sicp =300 & sidpp=300 psi.
Circulated at 10184.0 ft
circ. well through flow line monitor same every
5-min fro loss & gain.
Began precautionary measures
stopped to change operation.
Circulated at 10184.0 ft
Mix lcm pill & to 44 lbs. per. bbl. & spot to
section mill & perform walking sqz. did not see no
increase of dpp during the hesitation of this.
pumped in intervals of 2-bbl. at 1-bpm.
25.000 bbl LCM pill spotted downhole, LCM content 44.0 lb/bbl
Circulated at 10184.0 ft
circ. bottoms up & perform 5-bbl. per. min.
integrity test per. faxed in sheet
Slow circulation rates completed
Circulated at 10184.0 ft
circ. & cond. well bore fluids. & run integrity
test at 4-bbl. per min & 5-bbl. per. min 0-loss at
these test.
Obtained req. fluid properties - 200.00 %, hole vol.
Milled Casing at 10184.0 ft
mill csg. f/10184' to 10187' at 1-fph. & monitor
return loss at app. 8-bbl. per. hr. @ 5.2 bpm
rate drill pipe psi. 2000 psi.
On bottom
BHA run no. 2 (cont...)
Milled Casing cutter at 10190.0 ft
mill csg. @ 5.5 bbl. per. rain to 6.2 bbl. per min
loosing fluid at different rates o loss per 5-min
to 3 bbl.
Observed change in Cutting volumes
Circulated at 10190.0 ft
circ. bottoms up @ 5.5 bbl. per minn
Hole swept with slug - 105.00 % hole volume
Milled Casing cutter at 10200.0 ft
at this point we had recovered a total that was
weightable of 207 bbl. of iron & weight of 16 feet
was 416
Observed change in Cutting volumes
Circulated at 10200.0 ft
work section mill in milled section & sweep with
1-1ow vis sweep & 2-high vis sweep (returns did not
increase.)
Hole displaced with Lo/Hi vis combination - 325.00 % displaced
Worked toolstring at 10200.0 ft
when attempting to pull section mill into csg. we
would have a resistance of 40 k as the section mill
was at the upper stub continue to work section mill
and pull 40 k and all came free.
At 7in casing shoe
Circulated at 10200.0 ft
circ. bottoms up at 6.2 bbl. per. min returns did
Flor :~ '~: ~-"- ....
lllUlSat~ ~uttlll~_> t/all and
IIUtlIIII~
Facility M Pt L Pad
Date/Time
20:30
20:30-21:30
Duration
lhr
21:30
21:30-22:00
1/2 hr
22:00
22:00-06:00
8hr
27 Aug 99 06:00
06:00-09:00
06:00-09:00
3hr
3hr
09:00
09:00-06:00
09:00-14:00
14:00
14:00-18:00
21 hr
5hr
4hr
18:00
18:00-19:30
1-1/2 hr
19:30
19:30-23:30
4hr
23:30
23:30-01:00
1-1/2 hr
28 Aug 99 01:00
01:00-03:00
2hr
03:00
03:00-06:00
06:00
06:00-06:00
3hr
24 hr
Progress Report
Well MPL- 16A Page 4
Rig Nabors 4ES Date 08 September 99
Activity as to cause resistance.
Obtained clean returns - 100.00 % hole volume
Functioned downhole tools at 10200.0 ft
work section mill in open hole and determint that
cutters were of two things (1) would not open due
to debri or (2) cutters broke.
Casing cutter failed - End BHA run
Flow check
prep for trip (let well bore flow to static 12.5
bbl. flowed back.
Observed well static
Pulled out of hole to 7400.0 ft
pooh encountering upward drag at different spots
and work pipe occasionally & encounter a tight
spot @ 9196' & circ. to surface and nothing but lcm
was observed, continue pulling out without drag.being
excessive.ti 7400'
Stopped: To hold safety meeting
crew change
BHA run no. 2 (cont...)
Pulled out of hole to 0.0 ft
pooh & lay dn section mill (findings were that mill
cutters were fouled with iron )
Stopped: To pick up/lay out tubulars
BHA run no. 3
R.I.H. to 10200.0 ft
break circ @ 7000' on trip in hole
On bottom
Milled Casing cutter at 10212.0 ft
Run section mill #2 & mill csg & work pipe
periodically & pump high vis & weighted pills & low vis
every 5-foot or so loosing fluid at different rates
while milling.& low vi
Observed change in Cutting volumes
Functioned downhole tools at 10212.0 ft
work section mill # 2 & fouled cutters with iron
&had to drop ball & re-open cutters.
Equipment work completed
Milled Casing cutter at 10226.0 ft
mill section & work section mill & pump sweeps to
clean hole with fluid losses in different ranges
through out the operation.
Began precautionary measures
Functioned downhole tools at 10226.0 ft
work mill in open hole section & fouled cutters
with iron & drop ball & re-open cutter.
Equipment work completed
Milled Casing cutter at 10245.0 ft
mill with losses ranges from 4-bbl. per 5-min to
O-losses per 5-min.
Completed operations
Circulated at 10245.0 ft
circ & condition open hole milled section
Hole displaced with Water based mud - 300.00 % displaced
BHA run no. 3 (cont...)
Facility
Date/Time
29 Aug 99
Progress Report
M Pt L Pad
Well MPL-16A Page 5
Rig Nabors 4ES Date 08 September 99
06:00-07:00
07:00
07:00-09:30
09:30
09:30-11:00
11:00
11:00-14:30
14:30
14:30-16:30
16:30
16:30-20:30
20:30
20:30-21:00
21:00
21:00-04:00
04:00
04:00-05:00
05:00
05:00-06:00
06:00
06:00-10:00
06:00-07:00
07:00
07:00-07:30
07:30
07:30-10:00
10:00
10:00-06:00
10:00-20:30
20:30
20:30-22:00
Duration
lhr
2-1/2 hr
1-1/2 hr
3-1/2 hr
2hr
4hr
1/2 hr
7hr
lhr
lhr
4hr
lhr
1/2 hr
2-1/2 hr
20 hr
10-1/2 hr
1-1/2 hr
Activity
Flow check
pump dry job & monitor well flowed back 7-bbl.s
Observed well static
Pulled out of hole to 9852.0 ft
jpoooh to 9852' with 10 k to 50k over normal pu wt.
Observed 50.00 klb overpull
Circulated at 9852.0 ft
circ. bottoms up @ 5-bpm 2100 psi. 12-30 bph loss
rate. & monitor well at end of circ. 3-bbl. back
well static.
Hole displaced with Water based mud - 200.00 % displaced
Pumped out of hole to 9384.0 ft
10-50 k overpull & packing off (occasionally)
Stopped · To circulate
Circulated at 9384.0 ft
circ. & add concentration of E-P lube to fluid
system. (had a reduction of 20k up drag & 10 k dn
Hole displaced with Water based mud - 125.00 % displaced
Pulled out of hole to 8600.0 ft
single out with pump.
Stopped · To circulate
Circulated at 8600.0 ft
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 6519.0 ft
single out with pump due to drag.
Stopped · To circulate
Circulated at 6519.0 ft
circ. 20 bbl. low vis sweep .& hi-vis & work pipe
Hole swept with slug - 125.00 % hole volume
Pulled out of hole to 6300.0 ft
single out ( overpull seems reduced greatly.
Stopped · To hold safety meeting
crew change
BHA run no. 3 (cont...)
Held safety meeting
service rig & safety meeting.
Completed operations
Pulled out of hole to 6000.0 ft
single 10-jts. out to assure that pump is no longer
needed
Stopped · To change handling equipment
Pulled out of hole to 0.0 ft
no excessive drag stand in derrick & lay dn section
mill with no debri on mill.
Stopped ' To change handling equipment
3-1/2in. Drillpipe workstring run
Ran Drillpipe in stands to 10312.0 ft
Mu mule shoe & rih breaking circ.
3000'--6000'--7500';-9000' & single with kelly 10180' to 10312
On bottom
Batch mixed slurry - 17.000 bbl
mix & test lines to 3000 psi. & mix 17-bbl.
cmt. 17.0 ppg. & pump 5-bbl. h20 + test+20-bbl, h20
17-bbl. cmt.6-bbl, h20+53-bbl, mud & shut dn & use C-pump
L~, F ...... ~ ~._, ~,~,,. to ~,,,L,,n~ t,,~,~, c ~ 2145
Facility M Pt L Pad
Date/Time
22:00
22:00-23:00
23:00
23:00-00:00
Duration
lhr
30 Aug 99 00:00
00:00-01:00
lhr
01:00
01:00-04:15
04:15
04:15-06:00
06:00
06:00-21:30
06:00-08:00
lhr
3-1/4 hr
1-3/4 hr
08:00
08:00-09:15
15-1/2 hr
2hr
09:15
09:15-09:30
1-1/4 hr
09:30
09:30-10:30
10:30
10:30-13:30
13:30
13:30-15:30
1/4 hr
1 hr
31 Aug 99
15:30
15:30-16:30
16:30
16:30-21:00
21:00
21:00-21:30
21:30
21:30-00:30
21:30-00:30
00:30
00:30-01:00
00:30-01:00
3hr
2hr
lhr
4-1/2 hr
1/2 hr
3hr
3 hr
1/2 hr
1/2 hr
Progress Report
Well MPL-16A Page 6
Rig Nabors 4ES Date 08 September99
Activity hrs. 8/29/99
Completed operations
Pulled Drillpipe in stands to 9080.0 ft
pull 13-stds.
Stopped: To pressure test
Circulated at 9080.0 ft
circ. bottoms up 2-times to clean cmt. from
annulus.
Hole displaced with Water based mud - 200.00 % displaced
Injectivity test - 2.000 bbl injected at 800.0 psi
perf. hesitation sqz to 800 psi. in 200 psi.
increments. & hold.
Completed injectivity test
completed hesitation sqz.
Circulated at 9080.0 ft
WOC
Began precautionary measures
Singled in drill pipe to 9737.0 ft
single in with pump looking for cmt. top.
Began precautionary measures
3-1/2in. Drillpipe workstring run (cont...)
Singled in drill pipe to 10118.0 ft
single in hole with pump at low rate looking for
cmt. top.
Stopped: To circulate
Circulated at 10118.0 ft
circ. bottoms up @ 6-bpm 1800 psi. cmt.
contaminated on bottoms up
Obtained req. fluid properties - 150.00 %, hole vol.
Singled in drill pipe to 10173.0 ft
single in with pump to 10173' located firm cmt. top
that would support 10k did set dn compression test
several times to confirm.
Stopped: To circulate
Circulated at 10173.0 ft
circ. bottoms up & pump dry job.
Obtained bottoms up (100% annulus volume)
Laid down 4489.0 ft of 3-1/2in OD drill pipe
Stopped: To perform FIT
Circulated at 5684.0 ft
circ. welll bore to ensure correct mud gradient
for test & test to 13.0 ppg. using 1228 psi. applied
pressure & 8.7 ppg. fluid wt.
Stopped: To pick up/lay out tubulars
Serviced Block line
Line slipped and cut
Laid down 10173.0 ft of 3-1/2in OD drill pipe
330 joints laid out
Removed Bore protector
Equipment work completed
3-1/2in. Communication test string workstring run
Ran Tubing in stands to 2358.0 ft
Hanger landed
Wellhead work
Installed Hanger plug
install twc& test to ~"'~'~
~,,~u~, psi.
Progress Report
Facility M Pt L Pad
Well MPL- 16A Page 7
Rig Nabors 4ES Date 08 September99
Date/Time
Duration
Activity
01:00
01:00-05:30
01:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00
06:00-08:00
06:00-07:30
07:30
07:30-08:00
08:00
08:00-06:00
08:00-12:00
12:00
4-1/2 hr
4-1/2 hr
1/2 hr
1/2 hr
2hr
1-1/2 hr
1/2 hr
22 hr
4hr
Equipment work completed
Nipple down BOP stack
Rigged down BOP stack
Perform level one inspection on blind shear rams &
change upper seals.
Equipment work completed
Wellhead work
Rigged up Xmas tree
Stopped: To hold safety meeting
crew change.
Wellhead work (cont...)
Installed Xmas tree
install & tree to 5000 psi.
Equipment work completed
Removed Hanger plug
remove twc& install bpv.
Equipment work completed
Fluid system
Freeze protect well - 75.000 bbl of Diesel
Completed operations
rig released & warm stack on MPU L-16 @ 8/31/99
lgm.
Facility
Date/Time
17 Oct 99
18 Oct 99
M Pt L Pad
Progress Report
Well MPL-16A Page 1
Rig Nordic3 Date 01November99
00:00-06:00
00:00-06:00
06:00
06:00-10:00
06:00-08:00
08:00
08:00-10:00
10:00
10:00-17:30
10:00-17:30
17:30
17:30-18:00
17:30-18:00
18:00
18:00-00:00
18:00-00:00
00:00
00:00-02:00
00:00-02:00
02:00
02:00-06:00
02:00-06:00
06:00
06:00-12:00
06:00-12:00
12:00
12:00-06:00
12:00-19:00
19:00
19:00-06:00
Duration
6hr
6hr
4hr
2hr
2hr
7-1/2 hr
7-1/2 hr
1/2 hr
1/2 hr
6hr
6hr
2hr
2hr
4hr
4hr
6hr
6hr
18hr
7hr
llhr
Activity
Move rig
Rig moved 100.00 %
Finish moving rig from ARCO Kuparuk 1D-Pad to Milne
Point L-16A. Spot misc Service Company equipment.
Accept rig at 0001 hrs 10/17/99.
At well location - Cellar
Suspend operations
Held safety meeting
Shut rig down as directed to prepare for Milne
Point orientation.
Completed operations
Held safety meeting
Both rig crews attend Milne Point orientation.
Completed operations
Move rig
Rig moved 100.00 %
Spot Baroid, Sperry equipment. R/U lines to circ
out freeze protect diesel. Modify cuttings box chute.
Finish misc berming.
At well location - Cellar
Wellhead work
Removed Hanger plug
R/U lubricator and pull BPV.
Equipment work completed
Fluid system
Circulated at 2388.0 ft
Test lines with air. Attempt to circ out freeze
protect diesel. Unable to circ. R/U HB&R and pump 25
bbls methanol and thaw out. Circ out diesel with rig
pump.
Broke circulation
Wellhead work
Rigged up Xmas tree
Set TWC and test to 1000 psi. N/D tree.
Equipment work completed
Nipple up BOP stack
Rigged up BOP stack
N/U BOPS and associated lines, bell nipple,and
flowline.
Equipment work completed
Nipple up BOP stack (cont...)
Tested BOP stack
M/U test joint and test equipment and attempt to
start testing BOPS. Getting fluid out of annulus.
Change TWC and test from btm OK. Leak from top.
Perform preliminary test on choke manifold while
lcoating 3 1/2" test jt with donut.
Began precautionary measures
Suspend operations
Held safety meeting
Rig crews released for SDD/Nordic training at Milne
Point base camp.
Completed operations
Rig waited: Other delays
Facility
Date/Time
19 Oct 99
M Pt L Pad
06:00
06:00-07:00
06:00-07:00
Duration
07:00
07:00-10:30
07:00-10:30
lhr
lhr
10:30
10:30-15:00
10:30-15:00
3-1/2 hr
3-1/2 hr
15:00
15:00-19:30
15:00-19:30
19:30
19:30-21:30
19:30-21:30
4-1/2 hr
4-1/2 hr
4-1/2 hr
4-1/2 hr
21:30
21:30-00:00
21:30-00:00
2hr
2hr
20 Oct 99 00:00
00:00-05:00
00:00-05:00
2-1/2 hr
2-1/2 hr
05:00
05:00-06:00
05:00-06:00
5hr
5hr
lhr
lhr
Progress Report
06:00
06:00-10:00
06:00-09:00
Well MPL- 16A Page
Rig Nordic3 Date
4hr
3hr
Activity
2
01 November 99
Began precautionary measures
Suspend operations (cont...)
Held safety meeting
Rig crews attend MPL-16Ai pre-spud at Milne Point
base camp.
Completed operations
Test well control equipment
Tested BOP stack
Tempoary test on blinds against the casing to 1000
psi. M/U test joint and test upper rams to 250-3500
psi and Hydril to 250-250 psi. Tests OK. L/D
landing joint. These tests were erformed to be able to
pull hanger and tubing. AOGCC to witness later.
Pressure test completed successfully - 3500.000 psi
Pull Tubing, 3-1/2in O.D.
Laid down 2358.0 ft of Tubing
Pull hanger and L/D 75 jts 3 1/2" 9.3# tubing. NORM
same.
Completed operations
Test well control equipment
Tested BOP stack
R/U test equipment. Test hydril 250-2500 psi. OK.
Test upper rams and all valves to 250-3500 psi. OK.
Blind rams failed at high test. Test plug would not
seat completely in tubing head. Test jt X-O in
lower rams.
Pressure test completed successfully - 3500.000 psi
Repair
Repaired Bottom ram
Change seals in bottom rams.
Equipment work completed
Test well control equipment
Tested BOP stack
Test rams to 250-3500 psi. OK. Pull test plug. GIH
with Baker packer to 50' RKB. MFLI top drive on test
jts. Set packer and test down test jts between top
of packer an dbtm of btm rams. Test OK.
Pressure test completed successfully - 3500.000 psi
Run Drillpipe, 3-1/2in O.D.
Ran Drillpipe to 3530.0 ft (3-1/2in OD)
Finish loading pipe shed with an additional 250 jts
drill pipe. P/U 111 jts (37 stds for open hole) and
GIH.
On bottom
Pull Drillpipe, 3-1/2in O.D.
Pulled Drillpipe in stands to 3530.0 ft
POOH and start racking back drill pipe in derrick.
On second std out icy looking mud started failing
out of drill pipe. M/U top and started circulating.
Getting thick rubbery looking stuff out of hole.
Completed operations
Pull Drillpipe, 3-1/2in O.D. (cont...)
Circulated at 3330.0 ft
p.:_:~t. · ~ ..... : .... '~ ~71ud.
x.ml., circ Gut t. untanuHat~u
Facility
M Pt L Pad
Progress Report
Well MPL- 16A Page 3
Rig Nordic3 Date 01 November99
Date/Time
21 Oct 99
09:00
09:00-10:00
10:00
10:00-06:00
10:00-06:00
06:00-21:30
06:00-06:30
06:30
06:30-07:00
07:00
07:00-07:30
07:30
07:30-08:00
08:00
08:00-11:00
11:00
11:00-13:00
13:00
13:00-18:00
18:00
18:00-18:30
18:30
18:30-21:00
21:00
21:00-21:30
21:30
21:30-06:00
Duration
20 hr
20 hr
15-1/2 hr
1/2 hr
3hr
2hr
5hr
1/2 hr
2-1/2hr
1/2 hr
8-1/2 hr
Activity
Obtained clean returns - 100.00 % hole volume
Pulled Drillpipe in stands to 3330.0 ft
Pump slug. Blow down top drive. Finish POOH and
rack back a total of 37 stds (drill
pipe to be used for drilling open hole section).
Completed operations
BHA run no. 1
R.I.H. to 9230.0 ft
PFLI bit, B/S, F/S, 6-HWDP, Jars, 37 stds D/P, cont
to PFU and single in. Circ the hole clean with
viscous water every 500'. Change to courser shaker
screens for max flow (1-10 bpm). Rotate at 80-100 RPM.
Rotary torque 2000-5700. Contaminated mud to btm.
BHA run no. 1 (cont...)
R.I.H. to 9300.0 ft
Continue GIH cleaning out contaminated mud.
Stopped: To service drilling equipment
Serviced Top drive
Service top drive.
Equipment work completed
R.I.H. to 9626.0 ft
Continue GIH to 9626' stopping every -500' to
circulate out.
Began precautionary measures
Circulated at 9626.0 ft
Circulate btm up. Same contaminated mud coming out
of hole.
Obtained clean returns - 100.00 % hole volume
R.I.H. to 10181.0 ft
Cont GIH. Tag up at 9936'. M/U top drive. Rotate
thru with no wt. Cont GIH. Tag up 9956'. M/U top
drive. Rotate thru with no wt. Cont reaming down. Tag
firm cmt at 10181' RKB. Drill cmt at 80 fph down to
10200' (10' below top of window).
On bottom
Circulated at 10200.0 ft
Circ out contaminated mud. Cmt in returns. Pump
spacer sweep and displace hole with new mud. Shut down
and clean out possum bellies and shaker pans.
Obtained req. fluid properties - 100.00 %, hole vol.
Pulled out of hole to 2000.0 ft
Pump slug. Blow down top drive. POOH to 2000'.
Stopped: To hold safety meeting
Held safety meeting
Tour change. PJSM. Technical limit discussion.
Completed operations
Pulled out of hole to 0.0 ft
Finish POOH to BHA.
At BHA
Pulled BHA
L/D bit, subs, and jars.
BHA Laid out
BHA run no. 2
Facility
Date/Time
22 Oct 99
23 Oct 99
24 Oct 99
Progress Report
M Pt L Pad
Well MPL-16A Page 4
Rig Nordic3 Date 01 November99
21:30-22:30
22:30
22:30-01:00
01:00
01:00-02:00
02:00
02:00-04:00
04:00
04:00-05:30
05:30
05:30-06:00
06:00
06:00-06:00
06:00-13:30
13:30
13:30-15:00
15:00
15:00-06:00
06:00-06:00
06:00-06:30
06:30
06:30-07:00
07:00
07:00-05:00
05:00
05:00-06:00
06:00
06:00-06:00
06:00-08:00
08:00
08:00-09:30
Duration
lhr
2-1/2 hr
lhr
2hr
1-1/2 hr
1/2 hr
24 hr
7-1/2 hr
1-1/2 hr
15hr
24 hr
1/2 hr
22 hr
lhr
24 hr
2hr
1-1/2 hr
Activity
Made up BHA no. 2
P/U bit, motor, FS, and MWD. Orient same.
Completed operations
Made up BHA no. 2
Load MWD. DM failed. Change out same. Re-load new
MWD and orient same. Test OK.
Completed operations
Made up BHA no. 2
Finish P/U BHA and GIH.
BHA no. 2 made up
R.I.H. to 2800.0 ft
P/U drill pipe singles and GIH to 2800'.
Stopped: To service drilling equipment
Serviced Block line
Slip/cut 49' drill line.
Line slipped and cut
Serviced Top drive
Service top drive, block, and crown.
Equipment work completed
BHA run no. 2 (cont...)
R.I.H. to 10116.0 ft
Finish P/U singles and GIH. Start running stds out
of derrick. Break circ every 25 stds. Blow down top
drive after breaking circ.MFU top drive to break
circ and take ECD baseline numbers.
On bottom
Circulated at 10116.0 ft
Circ around EP treated (0.75%) mud while taking ECD
baseline numbers.
Obtained req. fluid properties - 100.00 %, hole vol.
Drilled to 10800.0 ft
Start kick-off from 10196' to 10213'. Continue
drill/slide from 10213' to 10800'. Max ECD 11.0.
Average ECD 10.8.
BHA run no. 2 (cont...)
Drilled to 10805.0 ft
Drill/slide from 10800' to 10805'.
Stopped: To service drilling equipment
Serviced Top drive
Service top drive, blocks, and crown.
Equipment work completed
Drilled to 11995.0 ft
Drill/slide from 10805' to 11995'
Started scheduled wiper trip: due to Footage drilled
Circulated at 11995.0 ft
Pump sweep and circulate out for wiper trip.
Obtained clean returns - 100.00 % hole volume
BHA run no. 2 (cont...)
Pulled out of hole to 11995.0 ft
Made 19 Stds wiper trip to 7" casing window. Hole
slick. No problems.
At BHA
Serviced Top drive
Blow down top drive. Service top drive, blocks, and
Facility
Date/Time
25 Oct 99
26 Oct 99
Progress Report
M Pt L Pad
Well MPL- 16A
Rig Nordic3
Page 5
Date 01 November 99
09:30
09:30-11:00
11:00
11:00-12:00
12:00
12:00-06:00
12:00-06:00
06:00-06:00
06:00-13:00
13:00
13:00-14:30
14:30
14:30~17:30
17:30
17:30-18:30
Duration
1-1/2 hr
1 hr
18hr
18hr
24 hr
7hr
1-1/2 hr
3hr
lhr
Activity bands.
Equipment work completed
R.I.H. to 11995.0 ft
GIH slow. Hole slick. No prombles.
On bottom
Circulated at 11995.0 ft
Break circulation and stage pumps up to drilling
rate. No losses.
Obtained bottoms up (100% annulus volume)
Drilled to 13000.0 ft
Drill from 11995' to 13000'.
Drilled to 13000.0 ft
Drilled from 13K' to TD @ 13435'
BHA run no. 2 (cont...)
Drilled to 13435.0 ft (cont...)
Drilled from 13K' to TD @ 13435'
Reached planned end of run - Section / well T.D.
Circulated at 13435.0 ft
Hi wt/hi vis sweeps.
Hole swept with slug - 100.00 % hole volume
Pulled out of hole to 10191.0 ft
short trip, 34 stds, tight @ 13144' to 13155'
worked through same
At 7in casing shoe
Serviced Top drive
blow down & service top drive, blocks & crown.
18:30
18:30-23:30
23:30
23:30-00:30
00:30
00:30-02:30
02:30
02:30-03:00
03:00
03:00-04:00
04:00
04:00-06:00
06:00-14:00
06:00-12:00
12:00
12:00-14:00
14:00
14:00-14:30
5hr
lhr
2hr
1/2 hr
1 hr
2hr
8hr
6 hr
2hr
1/2 hr
Equipment work completed
R.I.H. to 13435.0 ft
tagged at 13040' (top Kup C sand). MU top drive
break circ, & slowly stage pumps up to rate. Wash
/ ream thru tight spot. Kick out pumps and rotary
and slack off thru tight spot erea. Hole slick.
Pre-cautionary wash / ream to bottom
On bottom
Pulled out of hole to 12955.0 ft
At top of check trip interval
Circulated at 13435.0 ft
Pump high weight / high vis sweep and circulate
same.
Obtained bottoms up (100% annulus volume)
Circulated at 13435.0 ft
Drop and pump down Sperry Sun ESS.
Hi-Vis mud spotted downhole
Circulated at 13435.0 ft
Pump and spot 100 bbls lube pill. blow down top
drive.
Oil spotted downhole
Pulled out of hole to 13000.0 ft
BHA run no. 2 (cont...)
Pulled out of hole to 420.0 ft (cont...)
At BHA
Pulled BHA
BHA Laid out
Wellhead work
Facility
Date/Time
27 Oct 99
M Pt L Pad
Progress Report
Well MPL- 16A Page 6
Rig Nordic3 Date 01November99
14:00-14:30
14:30
14:30-16:00
14:30-16:00
16:00
16:00-16:30
16:00-16:30
16:30
16:30-17:00
16:30-17:00
17:00
17:00-06:00
17:00-18:00
18:00
18:00-23:00
23:00
23:00-23:30
23:30
23:30-04:00
04:00
04:00-06:00
06:00
06:00-09:30
06:00-09:30
09:30
09:30-16:30
09:30-13:00
13:00
13:00-13:30
13:30
13:30-14:00
14:00
14:00-14:15
14:15
14:15-15:00
Duration
1/2 hr
1-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
13hr
lhr
5hr
1/2 hr
4-1/2 hr
2hr
3-1/2 hr
3-1/2 hr
7hr
3-1/2 hr
1/2 hr
1/2 hr
1/4 hr
3/4 hr
Activity
Removed Wear bushing
Pull wear ring. Set test plug.
Equipment work completed
Well control
Worked on BOP - Top ram
Change rams to 4.5".
Equipment work completed
Test well control equipment
Tested Top ram
Test rams to 250 / 3500-OK.
Pressure test completed successfully - 3500.000 psi
Wellhead work
Installed Wear bushing
Pull test plug. Set wear ring.
Eqpt. work completed, running tool retrieved
Run Liner, 4-1/2in O.D.
Rigged up Casing handling equipment
RU liner running tools.
Work completed - Casing handling equipment in position
Ran Liner to 3425.0 ft (4-1/2in OD)
Ran total of 81 jts. 4.5", 12.6g, L-80, IBMT liner.
MU Baker hanger & liner top packer.
Hanger assembly installed
Circulated at 3425.0 ft
String displaced with Water based mud - 110.00 % displaced
Ran Drillpipe on landing string to 10120.0 ft
At Window ' 10120.0 ft
Circulated at 10120.0 ft
Circ & cond mud @ 4 bpm w/800 psi. P/U-95k;
S/O-65k.
Obtained req. fluid properties - 120.00 %, hole vol.
Run Liner, 4-1/2in O.D. (cont...)
Ran Drillpipe on landing string to 13435.0 ft
Finish RIH. Wash last stand down. Hole clean.
On bottom
Cement · Liner cement
Circulated at 13435.0 ft
Gradually worked rate up to 4.3 bpm w/1240 psi.
Reciprocated pipe.
Obtained req. fluid properties - 200.00 %, hole vol.
Batch mixed slurry - 35.000 bbl
PJSM. Continue circ while batch mixing.
Batch slurry mixed
Mixed and pumped slurry - 35.000 bbl
Pumped 15 bbls weighted spacer. Pump 35 bbls
Premium ' G' @ 15.8 ppg.
Released Dart
Displaced slurry - 125.000 bbl
Displace w/55 bbls perf pill & 70 bbls mud. Bumped
plug w/calculated displacement.
Plug bumped
Functioned Liner hanger
Pressure up to 3500 psi to set hanger. Continue to
4700 psi to set liner top packer. Bled off. Floats
Facility
Date/Time
28 Oct 99
29 Oct 99
Progress Report
M PtL Pad
Well MPL-16A Page 7
Rig Nordic3 Date 01 November99
15:00
15:00-16:30
16:30
16:30-20:00
16:30-20:00
20:00
20:00-01:00
20:00-01:00
01:00
01:00-05:30
01:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00
06:00-06:00
06:00-06:30
06:30
06:30-14:00
14:00
14:00-16:00
16:00
16:00-17:00
17:00
17:00-19:30
19:30
19:30-20:30
20:30
20:30-23:00
23:00
23:00-02:00
02:00
02:00-03:30
Duration
1-1/2 hr
3-1/2 hr
3-1/2 hr
5hr
5hr
4-1/2 hr
4-1/2 hr
1/2 hr
1/2 hr
24 hr
1/2 hr
7-1/2 hr
2hr
lhr
2-1/2 hr
lhr
2-1/2 hr
3hr
1-1/2 hr
Activity right. Pressure DP to 1000 psi and unsting.
Equipment work completed
Circulated at 10010.0 ft
Set down 40k on top of liner. Circ till clean
returns. No cement.
Obtained clean returns - 120.00 % hole volume
Perform integrity test
Tested Liner
Test 7" & 4.5" to 3110 psi and broke down. Bled to
1100 psi in 5 min.
Suspended pressure test on Liner, observed leak
Run Liner, 4-1/2in O.D.
Racked back Drillpipe
POH. LD running tool.
Required components racked in derrick
Test well control equipment
Tested BOP stack
Test BOPE to 250/3500 psi.
Pressure test completed successfully - 3500.000 psi
3-1/2in. Communication test string workstring run
Rigged up sub-surface equipment o Retrievable packer
PU Baker 7" retrievable packer w/5.25" seal stem.
Equipment work completed
3-1/2in. Communication test string workstring run (cont...)
Serviced Top drive
Equipment work completed
Ran Drillpipe in stands to 9980.0 ft
Tested Casing to 3500 psi @ 4850'. Cont RIH.
Stopped · To test equipment
Tested Casing
Test annulus to 3500 psi @ 9980'-OK. Sting into
liner top packer. Tested annulus to 3500 psi-OK.
Pressure test completed successfully - 3500.000 psi
Tested Liner
Attempt to test liner. Pumping away @ 1700 psi.
Bled down to 390 psi.
Suspended pressure test on Other sub-surface equipment, observed le
Circulated at 10009.0 ft
Circ & cond.
Obtained req. fluid properties - 150.00 %, hole vol.
Tested Liner
Sting into liner top packer. Pressure annulus to
3400 psi. Pump down DP w/1500 psi @ 3.6 bpm.
Pressure annulus to 4500 psi f/30 min-OK. 9 5/8" x 7"
annulus increased f/20>>790 psi. Injected 130 bbls
mud down liner during test. Bled 7" x 3.5" to 3000
Suspended pressure test on Other sub-surface equipment, observed le~
Tested Liner
Bled back 43 bbls.
Suspended test, observed returns from wellbore
Circulated at 10009.0 ft
Circ 40 bbls Barazan, 30 bbls Dirt Magnet, & 45
bbls Barazan. Circ around w/seawater.
Hole swept with slug - 150.00 % hole volume
Flow check
Facility
M Pt L Pad
Progress Report
Well MPL- 16A Page
Rig Nordic3 Date
8
01 November 99
Date/Time
30 Oct 99
31 Oct 99
03:30
03:30-06:00
06:00-20:30
06:00-06:30
06:30
06:30-20:30
20:30
20:30-06:00
20:30-06:00
20:30-06:00
06:00-08:30
06:00-08:30
08:30
08:30-16:30
08:30-09:00
09:00
09:00-09:30
09:30
09:30-12:30
12:30
12:30-16:30
16:30
16:30-18:30
16:30-18:30
18:30
18:30-22:30
18:30-22:30
22:30
22:30-23:30
22:30-23:30
23:30
23:30-00:00
23:30-00:00
00:00
00:00-06:00
00:00-02:00
Duration
2-1/2 hr
14-1/2 hr
1/2 hr
14hr
9-1/2 hr
9-1/2 hr
9-1/2 hr
2-1/2 hr
2-1/2 hr
8hr
1/2 hr
1/2 hr
3hr
4hr
2hr
2 hr
4hr
4 hr
lhr
lhr
1/2 hr
1/2 hr
6hr
2hr
Activity down.
Observed well static
Laid down 2200.0 ft of 3-1/2in OD drill pipe
3-1/2in. Communication test string workstring run (cont...)
Serviced Travelling block
Service rig, top drive, crown and blocks.
Equipment work completed
Laid down 11000.0 ft of 3-1/2in OD drill pipe
330 joints laid out
Electric wireline work
Conducted electric cable operations
POOH & R/D Schlumberger
Conducted electric cable operations
Made first trip to 7670'. Unable to pump down.
POOH PU additional weight bar and rollers. 2nd run
made it to 12670'. Log up while pumping 2 BPM.Leak
found in liner top packer/hanger. POOH.
Electric wireline work (cont...)
Conducted electric cable operations (cont...)
Made first trip to 7670'. Unable to pump down.
POOH PU additional weight bar and rollers. 2nd run
made it to 12670'. Log up while pumping 2 BPM.Leak
found in liner top packer/hanger. POOH.
Completed logging run with Spinner from 12900.0 ft to 9930.0 ft
Run Tubing, 3-1/2in O.D.
Serviced Top drive
Equipment work completed
Removed Bore protector
Equipment work completed
Flow check
Monitor well flowed back 17 bbls.
Observed well static
Ran Tubing to 2235.0 ft (3-1/2in OD)
Run 3.5" NSCT kill string to 2235'
Hanger landed
Nipple down BOP stack
Rigged down BOP stack
N/D BOPE
Equipment work completed
Wellhead work
Installed All tree production valves
T.P. Adaptder to 5000 psi. T.P tree to 5000 psi
Equipment work completed
Fluid system
Freeze protect well - 84.000 bbl of Diesel
Pump 59 bbls diesel down annulus taking returns f/
tbg. Close tbg and inject 25 bbls down annulus.
Completed operations
Wellhead work
Installed Hanger plug
Equipment work completed
Move rig
Rigged down Drillfloor / Derrick
Jack up rig move off well, P/U pit liner & clean up
Facility
Date/Time
M Pt L Pad
02:00
Progress Report
Well MPL- 16A
Rig Nordic3
Page
Date
Duration
Activity
Equipment work completed
9
01 November 99
MEMORANDUM
TO-
State of Alaska
Alaska Oil and Gas Conservation Commission
Robert Christenson,~//~ DATE: November 30, 1999
Chairman (.,{'
THRU'
Blair Wondzell,
P. I. Supervisor
FROM: John Crisl:~~ SUBJECT:
Petroleum Ir~pector
FILE NO:
Nabors 4es. DOC
BOPE Test
Nabors 4es
BPX MPU L-16ai
PTD 95-80
Verbal Approval
November 30,1999: I traveled to Nabors 4es in MPU to witness initial BOP test
on BPX L-16ai workover.
The test went well. The crews had just arrived from Anchorage to start workover
on this well. Due to bad weather conditions & start up of Rig, safety meetings
were held with each crew.
SUMMARY: I witnessed initial BOP test on Nabors 4es workover of BPX MPL-
16ai. No failures witnessed. Test time 3.5 hours.
__
Attachments' BOP Nabors 4es 11-30-99jc
cc;
NON-CONFIDENTIAL
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: Workover: X
Drlg Contractor: Nabors Rig No. 4es PTD #
Operator: BPX Rep.:
Well Name: MPL-16ai Rig Rep.:
Casing Size: Set @ Location: Sec.
Test: Initial X Weekly Other
95-80
DATE: I 1/30/99
Rig Ph.# 659-4~54
Mr, Larry Meyers
Mr. Gene Sweat
8 T. 13N R. IOE Meridian UM
MISC. INSPECTIONS: FLOOR SAFETY VALVES:
Location Gen.: OK Well Sign OK Upper Kelly/IBOP
Housekeeping: OK (Gen) Dd. Rig OK Lower Kelly/IBOP
PTD On Location 95 Hazard Sec. YES Ball Type
Standing Order Posted YES Inside BOP
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Quan. Test Press. P/F
~ 250/3,000 P
250/3,500
250/3,500 P
250/3,500 P
250/3,500 P
250/3,500 P
AbA
MUD SYSTEM: Visual Alarm
Trip Tank OK
Pit Level Indicators OK P
Flow Indicator OK P
Meth Gas Detector OK P
H2S Gas Detector OK P
Test
Quan. Pressure P/F
NIA
~ 250/3,5O0 P
~ 250/3,5O0 P
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
Test
Pressure P/F
1 ~ 250/3, 500 P
22 250/3,500 P
~ OK
Functioned
Functioned
OK
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's:
3,000
'1,750
minutes 2'/
'/ minutes 48
X Remote:
4 Btis, @ 1600psi.
Psig.
sec.
sec.
X
Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested '/5 Repair or Replacement of Failed
Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS: Verbal approval was given for weft work. The Permit to Drill on location was 95-80.
t~'g is in good shape. Operator & Contractor Reps. were very accommodating as usual.
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - Inspe~;~.~lL (Rev. 12/94)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By: John Crisp
rs 4es 11-30-99jc
...... STATE OF ALASKA '--
ALASKA ..,~L AND GAS CONSERVATION COi,:,,-llSSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [-] Development KBE = 49.6'
[--[ Exploratory 7. Unit or Property Name
i3. Address I--IStratigraphic Milne Point Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [Y(] Service
4. Location of well at surface 8. Well Number
MPL-16i
3604' NSL, 5148' WEL, SEC. 8, T13N, R10E 9. Permit Number
At top of productive interval 95-80
2285' NSL, 1587' WEL, SEC. 33, T14N, R10E 10. APl Number
At effective depth 50-029-22566
2413' NSL, 1422' WEL, SEC. 33, T14N, R10E 11. Field and Pool
At total depth Milne Point Unit / Kuparuk River
2479' NSL, 1399' WEL, SEC. 33, T14N, R10E Sands
12. Present well condition summary
Total depth: measured 15910 feet Plugs (measured)
true vertical 7716 feet
Effective depth: measured 15779 feet Junk (measured)
true vertical 7613 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 110' 20" 250 sx Arcticset I (Approx.) 110' 110'
Surface 9012' 9-5/8" 1740 sx PF 'E', 250 sx 'G', 132 sx PF 'E' 9048' 4510'
Intermediate
Production 15834' 7" 275 sx Class 'G' 15867' 7685'
Liner
Perforation depth: measured 15478'-15601'ORIGINAL
true vertical 7376' - 7472
Nasl~a 0il & Gas Con. ~Ju~,,,,~issi0ri
Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 to 15382' Anch0rag8
Packers and SSSV (type and measured depth) 7" Baker 'S-3' packer at 15280'; 7" Baker 'SAB-3' packer at 15362
13. Attachments [~ Description summary of proposal [--[ Detailed operations program ~--] BOP sketch
14. Estimated date for commencing operation 15. Status of well classifications as:
August 10, 1999
16. If proposal was verbally approved [--I Oil [] Gas [] Suspended
Service Water Injection
Name of approver Date approved
Contact Engineer Name/Number: Michael Triolo, 564-5774 Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby c~(~i~~ true and correct to the best of my knowledgeSigned ~---,~
Charles Mallary .,.,,~ Title Senior Drilling Engineer Date
(/
Commission Use Only
I
No.
Conditions of/~l~proval: Notify Commission s~o representative may witness ]Approval
-.,e6 C_.~OV'~ Plug integrity ,/" BOP Test "'"- Location clearance
JXg'~e~2,.~ J Mechanical Integrity Test Subsequent form required 10-
~-~~ ORIGINAL SIGNED'BY .
._...-~ ,\ .... Robert N Chdstenson
A13'pro~ed'by order of the L;ommission Commissioner Date
Form 10-403 Rev. 06/15/88 Submi In rip te
_ hare. d
.r?.ce
rllllng
To: Blair Wondzell - AOGCC
From: Michael Triolo
Subject:
MPL-16i Application for sundry permit - P&A for Sidetrack Operations
Date: 5 August 1999
Reference: API #50-029-22566
L-16i was drilled and completed in 1995 as an A sand injector. Through the course of two years the well has pressured
up the surrounding area to > 5000 psi. It is apparent that this well is supporting little if any production. The well has
been shut in since February 1999 and is scheduled to be sidetracked South of its current location to provide support
and reserves sweep to L-29 and L-07.
The IvfPL-16i decompletion is currently scheduled for Nabors 4ES following the MPK-13 ESP exchange. The rig is
expected to finish operations on MPK-13 on the 20th of August. The pre-rig work for the MPL-16i decompletion is
planned to begin around August 10th pending Sundry approval.
Pre Rig Work:
1) Test Packoff
2) CTU abandon perf'd interval, spot cmnt from PBTD to 100' above the top perf i.e. tubing tail at 15,381'
3) Punch the tubing above the PBR.
4) Freeze protect
5) Set BPV
RWO Scope of work:
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
Pull BPV with lubricator
Circulate well
Set TWC
ND tree. NU and test BOP.
Test Casing
Pull and LD tubing. Inspect for NORM.
Replace Mandrel packoff if required
Install bowl protector
RIH with bridge plug and set at 10,450' Change well over to milling fluid and set BP.
RIH with section mill. Mill 50' section of 7" casing from 10,200'-10,250'
Circulate and condition mud. POH
RIH open ended and lay cement kick off plug from BP to a minimum of 100' above the section.
AOGCC to be notified to witness plug placement and testing.
Freeze protect. NU BOP NU tree and release rig.
Wellhead: FMC Gen 5 w/11"
5 M thru bore system.
Hanger: 11" x 3.5" NSCT hng.
w/3" ClW- H BPVT
Tree: 11" x 3 1/8" ESP adapter
(dummied off) and 3 1/8" 5M
valves / cross / cap
Actuator: 3 1/8"
13 3/8", 48 ppf K-55 Btrc.
9-5/8" 40 ppf L-80 BTC
Mill 7" casing fromlO,200' -10,250'
10.2 ppg mud from top PBR to BP
7" shod joint from 15,150' to 15,170' wlm
PERFORATION SUMMARY
Ref. Log: AWS SBT / GR / CCL -7/25/95
IGun SPF Interval
4.5" I 5 15,478'-15,601'
2.0 4 15,478'-15,601
(TVD
(7383'-7481')
Re-Perf 12/25/95
~P L-16i
Orig. KB e, -- 51.72'(Nabors 27E)
Oriel. DF elev. = 50.22'(Nabors 27E) GL. elev. =16.6'
[
Bridge plug @ 10,450'
Baker80-40 PaR Seal Assy.
(20' eft. stroke) ]15,239'md I
Baker 7'' s'3 Packer
15,280'md
HES 3.5" (2.81" PB)'X' npl. I15'296'md I
Two 0.25" equalization pods
HES 3.5" (2.81" PB)'X' npl.
15,297'md J
15,309'md I
Baker special overshot
(swallow 3.5" chem cut stub) 115,329'md I
Baker 7" SAB-3 packer
I15,362'md J
HES 3.5" 'XN' npl.
(0.813" pb, 2.75" ng) J 15,377'md J
WLEG [ 15,381'md J
4.5" TCP hollow carrier loaded w/32 gm.
Alpha Jet charges, EHD = 0.48", 'FI-P = 22.8"
7", 26 ppf, L-80 btrc. productioncasing ·
DATE REV. BY COMMENTS
6/17/95 DBR/DMR 7" Casing Run
11 / 24 / 95 JBF Initial Completion by Nabors 4 ES
8/2 / 99 M'FI- Decompletion by Nabors 4 ES
Top of cement, 100' above top peals (15,378')
PBTD I 15,779MD
Casing shoe I15,867 MD
MILNE POINT UNIT
WELL L-16i
BP EXPLORATION (AK)
Wellhead: FMC Gen 5 w/11"MP L-16iOrig. KB elev.: 51.72'(Nabors 27E)
5 M thru bore system. Orig. DF elev. = 50.22'(Nabors 27E) GL. elev.
Hanger: 11" x 3.5" NSCT hng. -- ' -"r-- -- ~ - ' =16.6,
w/3" CIW-H BPVT
Tree: 11" x 3 1/8" ESP adapter ~
(dummied off) and 3 1/8" 5M ,~
Actuator: 3 1/8" / ~ ~ , ,
-- ~ ~ KOP = 400', 'S' shape profile
13 3/8", 48 PPf K-55 Btrc. LI'0' ~/ / Max. hole angle = 67-72 deg. from
~ ~ 2876' to 13,260' MD
I - I7'' shod joint from 15,150' to 15,170' wlm
Minimum ID in completion string is
2.75" no-go in tbg. tail 'XN' npl.I 1----
~---------- IBaker 80-40 PBR Seal Assy. I 15,239'md
(20' elf. stroke)
~ 115 280'md
-- BakerT" S-3 Packer ~ '
PERFORATION SUMMARY I h'--"--ff I HES 3 5" '2 81" PB' 'X' n I '
R fe.Log:AWSSBT/GR/CCL-7/25/95 ~ ' P 115329md
............ I -- Baker special overshot 15,362'md
uun , ~'h ~merva, ~.,vu I I ~ I (swallow 3.5" chem cut stub) J' 15377md
4.5" 5 15,478'-15,601' (7383'-7481') II' ' I Baker 7" SAB 3 packer
2.0 4 15,478'-15,601 =lePer[ 12/25/95
II -""" '1HES 3-5'' 'XN' npl. 115'381'md
4.5" TCP hollow carrier loaded w/32 gm.
7", 26 ppf, I_-80 btm. product[oncasing Casing shoe i15,867 MD
DATE REV. BY COMMENTS MILNE POINT UNIT
6/17/95 DBPEDMR 7" Casing Run WELL L-16i
11 / 24 / 95 JBF Initial Completion by Nabors 4 ES APl NO: 50-029-22566
BP EXPLORATION (AK)
F'EiRN~T DATA T DATA_~PLUS
95--080
95 .... 080
95 ~-080
Are dr'y
W a ss "L h e
Ar'e we'J 1
We'li i s
'JO .... %07 '-"~,~ COP!P!...ETZOI'.I ~,A-r':: f// ,i ~/' f.~ -/' /O" 16" ¢~.,"
DAZLY WELL OPS ~. O U Y' ~fl-,/' TO t / / .,,l ~// ~l ~/' l fJ /" / (~ /" cl 6 /'
d '¥ t.: c h s ant jo "j ~ s F' ,~ q u '¥ r' e d o
.... ,~ y e s n d r' e c e '¥ v e :.:I 2 y .¢:.; ~.., -
'¢/e'i 'i cor'ed? yes ~na'i ys~ s & descr'-~' pti' on r"::~ce"i vec'l'"
}c e '¥ v d ? ~
a., J'"l (~)
· t:es-ts r'equ, ir'ed? yes
i
STATE OF ALASKA -
ALASK,, OIL AND GAS CONSERVATION C IMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service Water Injection
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 95-80 95-174
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22566
4. Location of well at surface ~~T ~ :"':':~:i'~.i:i:,; 9. Unit or Lease Name
3604'At totalNSL'depth5148' WEL, SEC. 8, T13N, R10E~~~F~i~ f//.~ ~/~/i.~ ~ Milne Point Unit
At top of productive interval 10. Well Number
2285' NSL, 1587' WEL, SEC. 33, T14N, R10E ~: ° ~J. ......... ! MPL-16i
·/'~-j~__~ 11. Field and Pool
.-~
2479' NSL, 1399' WEL, SEC. 33, T14N, R10E ............. -: Milne Point Unit / Kuparuk River
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands
KBE = 49.6'I ADL 355017
12. Date Spudded06/05/95 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'J15' Water depth' if °fish°re 116' N°' °f C°mpleti°ns06/20/95 11/24/95 N/A MSLI One
i7. Total Depth (MD+TVD) 118. Plug Back Depth (MD+'I'VD)I19. Directional Surveyl20. Depth where SSSV set,.1. Thickness of Permafrost
15910 7716 F~ 15779 7613 F~ []Yes []No I N/A MD/ 1800' (Approx.)
22. Type Electric or Other Logs Run
Gyro, MWD, LWD, SBT/GR/CCL/CBL, GR/RES/NEU/DEN
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE VV-I-. PER FT. GRADE TOP BOTI'OM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91# NT80LHE 38' 105' 30" 250 sx Arctic Set I (Approx.)
9-5/8" 40# L-80 36' 9048' 12-1/4" 1740 sx PF 'E', 250 sx 'G', 132 sx PF 'E'
7" 26# L-80 33' 15867' 8-1/2" 275 sx Class 'G'
124. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD
and interval, size and number) Size DEPTH SET (MD) PACKER SET (MD)
4-1/2" Gun Diameter, 5 spf 2" Gun Diameter, 4 spf 3-1/2", L-80 15382' 15280' & 15362'
MD TVD MD TVD
15478'-15601' 7376'-7472' 15478'-15601' 7376'-7472'
26. . ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect w/61 bbls diesel
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
May 28, 1996 I Water Injection
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD ·
I
Flow Tubing Casing Pressure CALCULATED . OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or
water. Submit cor.e,~,,,~ips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Mark..__. 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
(Subsea)
Top Kuparuk 'A' 15473' 7322'
Top Kuparuk A3 15484' 7331'
Top Kuparuk A2 15507' 7349'
Top Kuparuk A1 15546' 7379'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is t~ue and/c(~rrect to the best of my knowledge
Signed
Tim Schofield
Title Senior Drilling Engineer Date [~,/,~/~/~
Kathy Campdamor, 564-5122
°' // Prepared By Name/Number:
INSTRUCTIONS
GENERAL'. This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
BP/AAI SHARED SERVICE
DAILY OPERATION~
PAGE: 1
WELL: MP L-16
BOROUGH: NORTH SLOPE
UNIT: UNKNOWN
FIELD: UNKNOWN
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 06/04/95 08:00
SPUD: 06/05/95 12:30
RELEASE: 06/24/95 08:00
OPERATION:
DRLG RIG: NABORS 27E
WO/C RIG: NABORS 4ES
06/05/95 (1)
TD: 80
PB: 80
06/06/95 (2)
TD: 1301' ( 0)
06/07/95 (3)
TD: 3351'(2050)
06/08/95 (4)
TD: 5847' (2496)
06/09/95 (5)
TD: 6302'( 455)
06/10/95 ( 6)
TD: 7900' (1598)
REPAIR DIVERTER VALVE MW: 0.0
MOVE RIG FROM MP L-24I TO MP L-16. HAD NIPPLED UP 20"
HYDRIL. STARTED HEAD WAS WELDED ON 14" TO HIGH. ND 20"
HYDRIL. PU AND STRAP BHA. CONTINUE MIX SPUD MUD. CHANGE
SLEEVE ON MOTOR. ADJ BENT HOUSING TO 1 1/4 DEG. REBUILD
FLOAT. FINISH WELDING CONDUCTOR. ALLOW CONDUCTOR TO COOL.
NU 20" HYDRIL. NU RISER, FLOWLINE, TURNBUCKLES. NU
DIVERTER LINE AND PIN ALL BRACKETS. FUNCTION TEST
DIVERTER. HYDRAULIC KNIFE FAILED. DISASSEMBLE AND REPAIR
KNIFE VALVE. FUNCTION TEST DIVERTER. OK. CONTINUE PU
BHA. PREPARE TO SPUD.
DRILLING MW: 0.0 VIS: 0
RIH AND TAG AT 40'. FILL HOLE. LEAK AT KNIFE VALVE.
REPAIR SAME. REPAIR HYDRAULIC LEAN ON IRON ROUGHNECK. TAG
ICE 40'. BEGIN WASH/RAM. RISER LEAKING. HAMMER UP SAME.
CONTINUE WASH/REAM TO 105'. SPUD AT 105'. DRILL FROM 105
- 1301'
DRILLING MW: 0.0 VIS: 0
DRILLING FROM 1301 - 3036' KINKED KELLY HOSE. ASSESS
DAMAGE. CBU. POH. CHANGEOUT CHOKE IN MWD. DOWNLOAD MWD.
BREAK BIT GUAGE SAME, OK. CHANGEOUT KELLY HOSE. DRILLING
FROM 3036 - 3351'.
CBU MW: 0.0 VIS: 0
DRILL F/ 3351 - 5059' CBU FOR SHORT TRIP. MONITOR WELL,
SHORT TRIP TO 3000'. NO PROBLEMS. DRILL F/ 5059 - 5847'.
DRILLING
MW: 0.0 VIS: 0
CBU F/TRIP. CHK F/FLOW. PUMP PILL. POOH DOWN LOAD MWD.
CHANGE OUT PULSER. LD NMDC. CHANGE OUT MOTOR. RIH T/HWDP.
ADJUST MODULATORS ON SCR'S T/GET MORE AMPS T/THE ROTARY
DRIVE. RIH FILL PIPE @3800. REAM T/5847. DRILL T/6302.
DRILLING MW: 0.0 VIS: 0
DRILL F/ 5847 - 7501' CBU FOR SHORT TRIP. MONITOR WELL.
PUMP DRY JOB. LAY DOWN 6 JTS DP. POH TO 5771' RIH.
REAM 6 JTS TO 7501' NO PROBLEMS. DRILL F/ 7561 - 7691'.
CHANGE PISTON AND LINER ON #2 PUMP. DRILL F/ 7691 - 7900'.
WELL : MP L-16
OPERATION:
RIG : NABORS 27E
PAGE: 2
06/11/95 ( 7)
TD: 9090' (1190)
06/12/95 (8)
TD: 9090' ( 0)
06/13/95 (9)
TD: 9090' ( 0)
06/14/95 (10)
TD: 9090' ( 0)
06/15/95 (11)
TD: 9780' ( 690)
WIPER TRIP MW: 0.0 VIS: 0
DRILL F/ 7900 - 8454'. MONITOR WELL. SHORT TRP TO 7356'.
NO PROBLEMS. DRILL F. 8454 - 9090'. PUMP HIGH-LO VIS
SWEEP. CIRCULATE AND CONDITION MUD. WIPER TRIP TO 858'
REDUCE MW MW: 0.0 VIS: 0
POH. WIPER TRIP TO HWDP. RIH TO 8816 - 9090'. NO
PROBLEMS. CIRCULATE AND CONDITION MUD. MONITOR WELL.
WELL TAKING FLUID, STATIC. CIRCULATE AND CONDITION MUD.
MONITOR WELL. PUMP DRY JOB, POH. LOSS INCREASED TO 21
BPH. RIH. HIT LEDGE @ 744' KELLY UP. WORK PAST LEDGE.
COULD NOT GET PAST LEDGE WITHOUT KELLY. CONTINUE TO WORK
PAST LEDGE WITH KELLY AND MOTOR. CLEANED UP TO WHERE WE
COULD GET THROUGH. RIH TO 9090'. FILL PIPE @ 3000'
INTERVALS. NO FILL. CIRCULATE. POH TO 8627'. SPOT LCM
PILL F/ 8627 - 7114'
RUN 9 5/8" CSG MW: 0.0 VIS: 0
REDUCE MUD WT F/ 9.4 - 9.1 IN PITS AND HOLE @ 7015'. TOP
OF LCM PILL @ 7114' RIH. TAG BTTM @ 9090' POH TO HWDP.
NO PROBLEMS. CUT AND SLIP LINE. ADJUST BRAKES. SATND
BACK HWDP. LAY DOWN BHA TO MUD. DOWN LOAD MWD. FINISH
LAY DOWN BHA. RIG UP CSG TOOLS. REPAIR LEAK AND QUICK
RELEASE ON DRAWWORKS CLUTCH. RUN 9 5/8" CSG. 20 JTS PH.
150 JTS RUN. FILLING PIPE EVERY 3 JTS. CIRCULATE EVERY 15
JOINTS.
MU 8 1/2 BHA MW: 0.0 VIS: 0
RUN 9 5/8" CSG. MU HGR AND LDG JT. BREAK CIRCULATION.
SWITCHED TO HOWCO. PUMPED 10 BBL WATER. TEST LINES. PUMP
65 BBL WATER, 672 BBLS 12.0# LEAD CMT, RELEASED BTM PLUG.
PUMP 52 BBL 15.8 TAIL CMT. RELEASE TOP PLUG, PUMP 10 BBL
WATER. SWITCH TO RIG PUMP, DISPLACE W/ 669 BBL SOURCE
WATER. BUMP PLUG. RD DIVERTER LINES. RIG UP AND DO TOP
JOB. PUMP 20 BBL WATER, 51 BBL CEMENT. RIG DOWN. LAY
DOWN CMT HEAD AND LDG JT. CLEAR FLOOR. SET OUT MOUSE HOLE,
ND FLOWLINE, LD RISER, SET BACK 20" HYDRIL. INSTALL
WELLHEAD. TEST.
DRILLING MW: 0.0 VIS: 0
CONTINUE MU BHA. LOAD SOURCES IN MWD. RIH. CONTINUE SORT
OUT DRILLPIPE. PU 65 JTS TO REPLACE PIPE LAID DOWN. KELLY
UP AND BREAK CIRC. WASH AND TAG FLOAT COLLAR AT 8961'
TEST CASING. GOOD TEST. DRILLOUT F/ CEMENT/SHOE AND 10'
NEW HOLE. CBU FOR L.O.T. PERFORM L.O.T. DRILLING FROM
9100 - 9780'
WELL · MP L-16
OPERATION:
RIG : NABORS 27E
PAGE: 3
06/16/95 (12)
TD:l1305' (1525)
06/17/95 (13)
TD:13523' (2218)
06/18/95 (14)
TD:14990' (1467)
06/19/95 (15)
TD:15343'( 353)
06/20/95 (16)
TD:15460' ( 117)
DRILLING MW: 0.0 VIS: 0
DRILLING FROM 9780 - 11305'. CIRCULATE SWEEP AROUND WHILE
ROTATE @ 130 RPM. HOLE CLEAN. NOTHING UNUSAL AT BOTTOMS
UP. FLOWCHECK WELL, OK. PUMP DRY JOB. SET BACK KELLY.
POH 24 STANDS TO CASING SHOE. PULL VERY SLOW DUE TO CASING
CHATTER/ VIBRATION WHILE POH. FLOWCHECK WELL, OK. RIH TO
10602'. DIFFICULT TO GET PIPE TO MOVE WHEN SLACKOFF UNTIL
BHA IN OPEN HOLE. AT THAT POINT NO TROUBLE, RIH. RU ATLAS
WL/GYRO DATA. WLIH AND RIH REFERENCE GYRO. RIH TO 10230'.
SURVEY EVERY 30' IN OPEN HOLE SECTION AND EVEY 100' INSIDE
9 5/8" CSG. CIRC ACROSS TOP OF WELL WHILE SURVEY. NO
LOSSES. MOVE PIPE BETWEEN SURVEYS. RD ARTLAS WL/GYRO
DATA. PREPARE RESUME DRILLING.
DRILLING MW: 0.0 VIS: 0
DRILLING FROM 11305 - 13276' CBU. ROTATE WHIL CBU. HOLE
CLEAN. FLOWCHCK WELL, OK. PUMP DRY JOB. POH 22 STANDS TO
11250'. NO PROBLEMS. HOLE IN GOOD SHAPE. RIH. NO FILL
AND NO PROBLEMS. DRILLING FROM 13276 - 13523'.
RIH AFTER SHORT TRIP MW: 0.0 VIS: 0
DRILLING FROM 13523 - 14700' CHANGE LINER AND SWAB IN #1
PUMP. DRILLING FROM 14700 - 14990' CIRC SWEEP AROUND.
ROTATE WHILE SWEEP HOLE. FLOWCHECK WELL, OK. PUMP DRY
JOB. SET BACK KELLY. 18 STAND SHORT TRIP. HOLE SMOOTH
AND IN GOOD SHAPE. NO PROBLEMS, POH.
LD BHA #3 MW: 0.0 VIS: 0
RIH AFTER SHORT TRIP. RUN RIGHT TO BOTTOM. NO PROBLEMS,
NO FILL. DRILLING FROM 14990 - 15343' CBU. MU AND DROP
ATLAS WL ELECTRONIC MULTI SHOT SURVEY TOOL AND PUMP DOWN
SAME. FLOWCHECK WELL, OK. PUMP DRY JOB. SET BACK KELLY.
POH. PULL 325 0 350K OFF BOTTOM. PULL 325K FIRST 10
STANDS. HOLE IN GOOD SHAPE. RETRIEVE MULTI SHOT SURVEY.
RETRIEVE SOURCES AND DOWNLOAD DATA FROM MWD.
DRILLING MW: 0.0 VIS: 0
LD BIT/MOTOR. MU BIT #4. STAND BACK SAME. BIT IN GAUGE.
SERVICE WEAR RING. RE-INSTALL SAME. SHUT DOWN ALL
ENGINES. REPLACE MAIN FUEL LINE TO ENGINES. CHANGEOUT MWD
PULSER. LOAD SOURCES. UPLOAD MWD. RIH TO 5143'. FILL
PIPE. PIPE FULL AFTER 3 BBL. REVERSE CIRC. GET RETURNS.
PREPARE POH TO CHECK FLOAT. POH. CHECK FLOAT. MOVE CROWS
FOOT UP 6.08' TO TOP OF NM STAB. RIH. VISUALLY INSPECT
DERRICK WITH DRECO REP, OK. RIH TO 9845'. PU KELLY. TAKE
CHECKSHOT SURVEY @ 9845', OK. CONTINUE RIH TO 15300'. PU
KELLY. PRECAUTIONARY REAM F/ 15300 - 15343'. NO FILL NO
PROBLEMS ENCOUNTERED ON TRIP. DRILLING FROM 15343 - 15460'.
WELL : MP L-16
OPERATION:
RIG - NABORS 27E
PAGE: 4
06/21/95 (17)
TD:15910' ( 450)
06/22/95 (18)
TD:15910' ( 0)
06/23/95 (19)
TD:15910' ( 0)
06/24/95 (20)
TD:15910' ( 0)
REAM SINGLES TO BTM MW: 0.0 VIS: 0
DRILLING FROM 15460 - 15910'. CIRCULATE SWEEP AROUND WHILE
ROTATE PIPE. COULD NOT ROTATE IN ONE PLACE VERY LONG OR
ELSE ROTARY WOULD STALL. IF MOVE PIPE ROTARY TORQUE PRETTY
EVEN. FLOWCHECK WELL, OK. PUMP DRY JOB. SET BACK KELLY.
POH. LD 1ST SINGLES. BEGIN POH W/ STANDS. TIGHT HOLE
STANDS 7-10. PULL 400K THRU THIS INTERVAL. WORK EACH
STAND THRU. CLEAN UP. CONTINUE POH TO 9 5/8" SHOE WITHOUT
ANY PROBLEMS. FROM HERE ON HOLE IN VERY GOOD SHAPE.
FLOWCHECK WELL, OK. RIH. WORK EACH STAND IN TIGHT HOLE
AREA TWICE AS PRECAUTION. CONTINUE RIH TO 15506'. REAMING
SINGLES BACK TO BOTTOM. REAMING EACH SINGLE TWICE.
RUN 7" CSG MW: 0.0 VIS: 0
REAM TO 15840' PACKED OFF, UNABLE TO MOVE PIPE. WORKED
FREE. FINISH REAM TO 15910'. CIRCULATE SWEEPS. MONITOR
WELL. LAY DOWN 10 JTS DP TO 15620' TIGHT @ 15620'
KELLY UP, WORK THROUGH TIGHT SPOT. LAY DOWN 2 JTS DP.
STAND BACK 16 STANDS. RIH TO 15506' W/ STANDS. KELLY UP,
RIH W/ SINGLES, NO PUMP, TO 15879' NO PROBLEMS. PUMP
LO/HI VIS SWEEPS. CONDITIONED MUD. DROP MULTI SHOT SURVEY
TOOL. PUMP DOWN. CHECK FOR FLOW. PUMP DRY JOB. POH. NO
PROBLEMS PULLING OFF BTM. CUT LINE. BREAK KELLY. CHECK
CROWN SAVER. POH. LAY DOWN HWDP AND BHA. DOWN LOAD MWD.
LAY DOWN REST OF BHA. PULL WEAR RING. INSTALL TEST PLUG.
CHANGE RAMS TO 7". TEST BOPE. RIG UP CSG TOOLS. RUN 7"
CSG.
TEST CSG MW: 0.0 VIS: 0
RUN 7" CSG. CIRCULATE @ 9036'. RUN 7" CSG. TOTAL OF 372
JTS. NO PROBLEMS. MU LDG JT, HGR AND CMT HEAD. LAND CSG.
BREAK CIRCULATION. SWITCH OVER TO HOWCO. PUMP 10 BBLS
WATER, TEST LINES. PUMP 10 BBLS WATER, 70 BBLS SPACER,
RELEASE BTM PLUG. PUMP 56 BBL 15.8%, CLASS G CMT. RELEASE
TOP PLUG. WITH RIG PUMPS, DISPLACED WITH 200 BBL SOURCE
WATER. SWITCH TO HOWCO. PUMP 82 BBL DIESEL, 10 BBL SOURCE
WATER. SWITCH TO RIG PUMPS, PUMP 312.7 BBL SOURCE WATER.
BUMPED PLUG. TEST CSG.
LAY DOWN DP MW: 0.0 VIS: 0
LD CSG TOOLS, SET PACK OFF, NIPPLE DOWN FLOW LINE, CHOKE
AND KILL LINE. BOPE. NIPPLE DOWN DRLG SPOOL AND ADAPTOR
SPOOL, AND REMOVE FROM CELLAR. NIPPLE UP TBG SPOOL.
INSTALL TBG HANGER. SET 2 WAY CHECK. NU ABANDON TREE.
TEST TREE AND PACK OFF, OK. SET MOUSE HOLE BACK IN TO LAY
DOWN DP. LAY DOWN DP OUT OF DERRICK.
WELL : MP L-16
OPERATION:
RIG : NABORS 27E
PAGE: 5
06/25/95 (21)
TD:15910' ( 0)
11/11/95 (22)
TD:15900
PB:15779
11/12/95 (23)
TD:15900
PB:15779
RELEASE RIG MW: 0.0 VIS: 0
FREEZE PROTECT 7" X 9 5/8" ANNULUS ON MP L-16 W/ DIESEL.
CHANGE OUT SOFT LOCK ON SWIVEL WHILE CLEANING DRIP PAN
UNDER FLOOR AND ROTART DRIVE MOTOR COMPARTMENT. CLEAN
BOPE. CLEAN PITS AND INJECT. FREEZE PROTECT MP L-16.
RELEASE RIG @ 1500 HRS ON 06/24/95. MOVING RIG TO MP F-45.
NU BOP'S MW: 0.0
MIRU. MOVE FROM MPF-37 TO MPL-16I. RIG LINES & TEST CASING.
ND GEN 5A TUBING SPOOL & NU GEN 5 TUBING SPOOL. NU ADAPTER
FLANGE & BOP'S. RIG ACCEPTED @ 0100 HRS., 11/11/95.
PU DP MW: 0.0
NU BOP'S. CHANGE ANNULAR SEALING ELEMENT. TEST ALL BOP
EQUIP. SET WR. PU 3-1/2" DP.
11/13/95 (24)
TD:15900
PB:15779
11/14/95 (25)
TD:15900
PB:15779
11/15/95 (26)
TD:15900
PB:15779
11/16/95 (27)
TD:15900
PB:15779
POOH FOR TCP MW: 0.0
CONT TO PU 3-1/2" T/15772'. CIRC & RECPP. TEST 7" CASING.
PUMP XANVIS SWEEP, DIRT MAGNET, FOLLOW WITH CLEAN FILTERED
BRINE. TEST CASING. BLOW DOWN KELLY & LD 1 JT & CUT
DRILLING LINE. POOH FOR TCP GUNS.
REVERSE INFUX FROM TBG MW: 0.0
CONT POOH. MU TCP BHA. RIH WITH TCP ASSY ON 3-1/2" DP. WORK
ON SCR. CONT TIH T/15642'. RIG ATLAS & RIH WITH GR/CCL,
UNABLE TO RUN PAST 5700'. POOH WITH WIRELINE & INSTALL
ROLLER WEIGHTS IN TOOL STRING. RIH T/10540', STOPPED. POOH
& LD 1 JT DP TO GET PIPE IN TENSION, ADD WEIGHT BAR & RIH
& TIE IN USING CBL & RA TAG. SET PACKER. RIG HOWCO. TEST &
FIRE GUNS. OBSERVE BLOW & SAW GOOD SIGNAL ON FLUID LEVEL
SENSOR. PU & OPEN BYPASS & REVERSE TUBING VOLUME. CRUDE TO
SURFACE @ 0548 HRS.
RUN GR/JB ON SLICKLINE 2 MW: 0.0
CONT TO REV INFLUX OUT OF DP. OPEN ANNULUS & MONITOR WELL &
PU & RELEASE PACKER. RD HOWCO & MONITOR WELL. LD DP. SLIP
DRILL LINE. CONT LAYING DOWN PIPE. RIG CAMCO & MAKE 3 RUNS
WITH GR/JB TO 15450', GETTING PUMP DOWN PLUG IN ALL RUNS.
CLEAN OUT MW: 0.0
#3 RIH WITH GR/JB, POOH, RECOVER RUBBER & METAL, RD CAMCO.
MU BHA %3. RIH WITH TUBING. CONT PU TUBING TO PBTD @
15779'. REV CIRC & MIX XANVIS SWEEP.
WELL : MP L-16
OPERATION:
RIG : NABORS 27E
PAGE: 6
11/17/95 (28)
TD:15900
PB:15779
11/18/95 (29)
TD:15900
PB:15779
11/19/95 (30)
TD:15900
PB:15779
11/20/95 (31)
TD:15900
PB:15779
11/21/95 (32)
TD:15900
PB:15779
POOH WITH TUBING MW: 0.0
REV CIRC, MIX XANVIS SWEEP. CIRC ADDING NALCO CORROTION
INHIBITOR. MONITOR. POOH & LD TUBING. HOLE NOT TAKING
CORRECT AMOUNT OF FILL. RIH TO TOP OF PERFS @ 15450'. REV
CIRC THROUGH CHOKE, WEIGHT UP BRINE. MONITOR WELL. POOH
WITH TUBING. FLOW NIPPLE LEAKING & REPAIR SAME. CONT POOH.
FREEZE PROTECT ANN MW: 0.0
POOH WITH TUBING. LD BHA #2 & PWR. PU TAIL ASSY & RIH WITH
TUBING. MU HANGER & LANDING JT. LAND TUBING, RILDS & LD
LANDING JT. ND BOP. NU ADAPTER FLANGE, INSTALL XMAS TREE &
TEST. MU HARD LINES, PULL TWC. RU & FREEZE PROTECT ANNULUS
WITH DIESEL.
NU BOP MW: 0.0
FINISH FREEZE PROTECT ANNULUS WITH DIESEL & BULLHEAD DIESEL
DOWN TUBING. DROP PACKER, SETTING BALL. ATTEMPT TO SET
PACKER WITH DIESEL INJECTING FLUID. DRAIN XMAS TREE & CHECK
FOR 1-5/16 BALL. PUMP DOWN & SEAT BALL WITH BRINE. PRESSURE
UP TUBING & SET PACKER. PRESSURE ANNULUS & BLED DOWN. TEST
WITNESSED BY MR. GRIMALDI WITH AOGCC. TAKE ON BRINE.
ATTEMPT TO PRESSURE DOWN TUBING-BALLSHEARED. TEST ANNULUS
WITH TUBING OPEN. BLEED PRESSURE & RD HARD LINES. RU CAMCO.
RIH WITH GR TAG PLUG, LATCH ON, JAR & POOH WITH PLUG & RD.
SET TWC, ND XMAS TREE & ADAPTER FLANGE. NU BOP.
POOH TUBING MW: 0.0
NU BOP'S, RISER & FLOWLINE. RU & TEST BOPE. PULL 2-WAY
CHECK. RU ATLAS WITH LUB ON LANDING JT. RIH WITH CCL, WLM,
CCL, CUT & POOH. RD ATLAS. MU LANDING JT, REV CIRC,
DISPLACED TUBING DIESEL. CIRC CONV & DISPLACED DIESELL
ANNULUS. BOLDS-PULL HANGER TO FLOOR. CBU. LD HANGER &
LANDING JT. CUT & SLIP DRILLING LINE. POOH TUBING.
TEST ANNULUS MW: 0.0
POOH WITH TUBING. SWR. RU ATLAS. MU SHOOTING FLANGE & TEST.
MU CCL & BP. RIH T/15327' WLM, SET BP, POOH & RD ATLAS. ND
SHOOTING FLANGE & NU FLOW NIPPLE. RU & TEST 7" CASING. MU
BHA #3. RIH WITH TUBING T/2075. SET PACKER & TEST ANNULUS
TO SURFACE. OK. RELEASE PACKER. RIH WITH TUBING T/5006'.
SET PACKER & TEST ANNULUS TO SURFACE. OK. RIH WITH TUBING
T/9735' SET PACKER & TEST ANNULUS TO SURFACE. OK.
WELL · MP L-16
OPERATION:
RIG : NABORS 27E
PAGE: 7
11/22/95 (33)
TD:15900
PB:15779
11/23/95 (34)
TD:15900
PB:15779
11/24/95 (35)
TD:15900
PB:15779
11/24/95 (36)
TD:15900
PB:15779
TEST CASING MW: 0.0
RIH T/15212'. TEST CASING F/15212' T/SURFACE & TEST
F/15212' T/BRIDGE PLUG @ 15327'. OK. POOH, TESTING. OK.
ESTABLISH LEAK @ 11715' TO BRIDGE PLUG. RIH, TEST ANNULUS &
CASING BELOW PACKER TO ISOLATE LEAK. RIH T/13095', TEST
DOWN TO BRIDGE PLUG. OK. TEST, ISOLATING LEAK. TEST ANNULUS
& CASING BELOW PACKER. UNABLE TO ESTABLISH LEAK. POOH
T/12660', TEST ANNULUS & CASING BELOW PACKER TO BRIDGE
PLUG. NO LEAK. RELEASE PACKER & TEST 7" FROM SURFACE TO
BRIDGE PLUG.
PU COMPLETION ASSY, RIH MW: 0.0
TEST 7" CASING FROM SURFACE TO BRIDGE PLUG @ 15327'. NO
LEAK. RIH T/15325'. LATCH & RELEASED BP. CBU. MONITOR WELL.
POOH WITH BRIDGE PLUG, PACKER & TUBING. WORK ON SCR'S. CONT
POOH WITH TUBING BP & PACKER-POWER. WORK ON SCR'S. PU #2
COMPLETION ASSY. RIH WITH TUBING.
NU ADAPTER FLANGE & TREE MW: 0.0
RIH WITH TUBING & COMPLETION ASSY. ATTEMPT TO SPACE OUT
OVER TUBING STUB @ 15332' WITH NO ROTATION-COULD NOT GET
OVER STUB, ROTATE & SWALLOW STUB. RU CAMCO. RIH WITH RHC
PLUG & BALL, TAG XN IN TAIL PIPE OF BOTTOM PACKER. PU & SET
RHC IN TIP X NIPPLE & TEST. POOH & RD CAMCO. SET PACKER &
TEST TUBING. TEST ANNULUS. NO LEAK. PBR SHEARED, PU WEIGHT,
SPACE OUT TUBING. MU HANGER & LANDING JOINT. REV CIRC
DIESEL DOWN ANNULUS. DIFF PRESSURE STING INTO PBR. BLED OFF
ANNULUS & OPEN HYDRIL, LAND TUBING, RILDS, RD LANDING JT,
SET TWC. ND BOP. NU ADAPTER FLANGE & XMAS TREE & TEST.
RELEASED @ 1200 HRS,11/24 MW: 0.0
TEST XMAS TREE, PULL 2-WAY CHECK. TEST CASING ANNULUS. NO
LEAK. PRESSURE UP ON TUBING, BALL SHEARED. UNABLE TO TEST
TUBING T/3500 PSI. SET BPV & BULLHEAD. DIESEL DOWN TUBING.
SECURE WELLHEAD & CLEAN PITS. RIG RELEASED @ 1200 HRS.,
11/24/95.
SIGNATURE:
(drilling superintendent)
DATE:
SPE[ '-SI/N DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
ORIGINAL
DATE OF SURVEY: 062095
MWD SURVEY
JOB NUMBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
0 .00 -49.60
162 162.50 112.90
251 251.97 202.37
342 342.38 292.78
434 434.25 384.65
0 0
0 22
0 11
0 48
2 16
N .00 E .00 .00N .00E
S 47.46 W .23 .36S .40W
N 68.22 W .38 .51S .75W
N 2.57 E .85 .18N .86W
N 15.98 E 1.63 2.58N .33W
.00
-.54
-.89
- .47
1.61
521 521.26 471.66
610 609.88 560.28
703 701.95 652.35
793 790.49 740.89
887 882.51 832.91
3 30
5 45
8 57
11 8
15 23
N 23.14 E 1.48 6.69N 1.19E 5.61
N 31.30 E 2.63 13.01N 4.58E 12.49
N 36.78 E 3.52 22.79N 11.33E 24.19
N 35.04 E 2.46 35.52N 20.52E 39.71
N 38.87 E 4.58 52.78N 33.65E 61.22
982 973.78 924.18
1077 1062.54 1012.94
1172 1149.56 1099.96
1268 1234.91 1185.31
1363 1317.30 1267.70
17 25
21 36
25 58
28 26
31 33
N 45.94 E 3.00 72.52N 51.81E
N 45.70 E 4.43 94.45N 74.37E
N 45.73 E 4.59 121.23N 101.82E
N 43.10 E 2.86 152.59N 132.49E
N 40.38 E 3.58 188.10N 164.11E
88.O3
119.48
157.83
201.69
249.18
1457 1395.49 1345.89
1551 1470.29 1420.69
1645 1543.68 1494.08
1740 1616.88 1567.28
1832 1684.23 1634.63
35 45
38 37
39 15
40 32
44 21
N 38.90 E 4.55 228.22N 197.29E
N 36.82 E 3.34 273.05N 232.10E
N 36.39 E .72 320.66N 267.46E
N 37.57 E 1.58 369.55N 304.28E
N 38.68 E 4.25 418.00N 342.34E
301.05
357.42
416.16
476.83
538.07
1926 1750.24 1700.64
2022 1815.88 1766.28
2119 1881.14 1831.54
2214 1942.56 1892.96
2308 1998.84 1949.24
46 59
46 55
48 13
51 28
54 40
N 38.53 E 2.79 470.82N 384.51E
N 39.47 E .72 525.44N 428.74E
N 39.35 E 1.35 580.60N 474.06E
N 40.50 E 3.53 636.41N 520.79E
N 41.95 E 3.64 692.72N 570.15E
605.29
675.24
746.35
818.90
893.66
2403 2052.01 2002.41
2497 2101.71 2052.11
2593 2148.23 2098.63
2687 2191.46 2141.86
2781 2231.54 2181.94
57 10
59 22
62 2
63 46
65 28
N 43.08 E 2.80 750.64N 623.28E
N 43.28 E 2.33 809.26N 678.29E
N 44.23 E 2.94 869.13N 735.63E
N 44.65 E 1.86 929.46N 794.79E
N 44.39 E 1.85 989.71N 854.04E
972.21
1052.58
1135.47
1219.97
1304.47
2876 2269.56 2219.96
2970 2305.35 2255.75
3065 2340.01 2290.41
3158 2372.81 2323.21
3255 2406.75 2357.15
67 10
68 11
68 57
69 33
69 43
N 45.59 E 2.14 1051.05N 915.36E
N 45.78 E 1.10 ll12.00N 977.78E
N 46.18 E .89 1173.38N 1041.31E
N 45.94 E .68 1233.47N 1103.66E
N 46.37 E .45 1296.80N 1169.60E
1391.21
1478.43
1566.74
1653.30
1744.69
SPER .-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHA~RED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062095
MWD SURVEY
JOB NUMBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
3351 2440.00 2390.40
3445 2474.31 2424.71
3541 2511.13 2461.53
3635 2547.74 2498.14
3729 2583.40 2533.80
69 36
67 39
67 9
67 22
67 45
N 46.90 E .53 1358.41N 1234.83E
N 46.55 E 2.11 i418.52N 1298.68E
N 46.88 E .61 1479.16N 1363.05E
N 47.19 E .38 1538.70N 1426.98E
N 46.75 E .60 1597.62N 1490.10E
1834.36
1921.98
2010.35
2097.62
2183.89
3824 2619.48 2569.88
3919 2655.29 2605.69
4015 2691.76 2642.16
4109 2727.11 2677.51
4203 2761.15 2711.55
67 32
68 7
67 31
68 7
69 13
N 46.37 E .43 1657.94N 1553.80E
N 45.77 E .85 1718.92N 1617.10E
N 46.15 E .72 1781.15N 1681.45E
N 45.04 E 1.27 1841.83N 1743.40E
N 44.71 E 1.23 1903.63N 1804.93E
2271.58
2359.43
2448.92
2535.63
2622.83
4298 2794.28 2744.68
4391 2826.26 2776.66
4485 2858.78 2809.18
4580 2891.46 2841.86
4679 2926.02 2876.42
70 6
69 55
69 35
69 49
69 25
N 45.29 E 1.08 1966.84N 1868.14E
N 45.03 E .32 2028.88N 1930.52E
N 44.61 E .55 2091.43N 1992.68E
N 45.68 E 1.09 2153.75N 2055.33E
N 45.06 E .71 2219.13N 2121.55E
2712.22
2800.19
2888.38
2976.74
3069.79
4771 2958.52 2908.92
4862 2990.23 2940.63
4961 3024.56 2974.96
5055 3058.22 3008.62
5148 3091.81 3042.21
69 13
70 4
69 21
68 28
69 20
N 44.57 E .55 2280.21N 2182.25E
N 44.46 E .94 2341.16N 2242.16E
N 44.99 E .88 2407.15N 2307.53E
N 44.81 E .96 2469.01N 2369.17E
N 45.17 E 1.00 2530.62N 2430.76E
3155.90
3241.36
3334.25
3421.58
3508.68
5246 3125.76 3076.16
5338 3157.77 3108.17
5431 3189.94 3140.34
5530 3223.67 3174.07
5622 3253.52 3203.92
69 53
69 38
69 40
70 31
71 40
N 45.84 E .85 2594.68N 2495.96E
N 45.87 E .27 2655.16N 2558.27E
N 44.74 E 1.15 2716.17N 2619.94E
N 45.66 E 1.23 2781.82N 2686.05E
N 45.94 E 1.28 2842.61N 2748.56E
3600.07
3686.89
3773.63
3866.79
3953.96
5716 3282.14 3232.54
5812 3311.63 3262.03
5905 3342.68 3293.08
6001 3376.22 3326.62
6096 3410.83 3361.23
72 40
71 34
69 42
69 15
67 58
N 46.38 E 1.15 2904.26N 2812.76E
N 47.06 E 1.32 2966.96N 2879.34E
N 46.12 E 2.21 3027.69N 2943.54E
N 46.38 E .54 3089.67N 3008.29E
N 44.48 E 2.30 3151.65N 3071.22E
4042.93
4134.32
4222.65
4312.23
4400.55
6191 3446.98 3397.38
6284 3482.93 3433.33
6378 3519.76 3470.16
6476 3557.48 3507.88
6571 3594.51 3544.91
67 27
66 43
67 28
67 5
66 49
N 43.03 E 1.51 3215.36N 3132.22E
N 42.96 E .79 3277.60N 3190.25E
N 42.95 E .78 3341.40N 3249.65E
N 42.73 E .43 3407.48N 3310.93E
N 43.36 E .68 3471.11N 3370.36E
4488.74
4573.81
4660.95
4751.03
4838.07
SPEll -SUN DRILLING SERVICES
ANCHOP~AGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/9
DATE OF SURVEY: 062095
MWD SURVEY
JOB NUMBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
6665 3631.78 3582.18
6757 3668.03 3618.43
6853 3705.83 3656.23
6946 3742.85 3693.25
7040 3779.74 3730.14
66 45 N 43.01 E .35 3534.48N 3429.84E
66 52 N 43.08 E .14 3596.33N 3487.60E
66 32 N 44.08 E 1.02 3659.93N 3548.12E
66 48 N 43.62 E .53 3721.84N 3607.60E
66 43 N 43.70 E .11 3783.99N 3666.91E
4924.96
5009.56
5097.34
5183.18
5269.08
7136 3818.06 3768.46
7233 3856.12 3806.52
7326 3890.90 3841.30
7424 3928.69 3879.09
7519 3967.17 3917.57
7609 4004.42 3954.82
7704 4041.63 3992.03
7801 4076.99 4027.39
7898 4110.79 4061.19
7990 4142.94 4093.34
8085 4176.77 4127.17
8181 4210.22 4160.62
8279 4243.83 4194.23
8371 4275.28 4225.68
8465 4307.45 4257.85
8560 4340.48 4290.88
8655 4373.61 4324.01
8750 4407.76 4358.16
8845 4441.85 4392.25
8940 4476.26 4426.66
9014 4503.22 4453.62
9112 4540.06 4490.46
9204 4575.19 4525.58
9300 4611.95 4562.35
9396 4646.73 4597.13
9490 4677.16 4627.56
9585 4706.16 4656.56
9681 4735.77 4686.17
9776 4765.26 4715.66
9871 4795.02 4745.42
66 25 N 43.99 E .42 3847.81N 3728.20E
67 31 N 43.64 E 1.17 3912.43N 3790.20E
68 11 N 44.49 E 1.13 3973.84N 3849.64E
66 36 N 44.18 E 1.64 4038.79N 3913.10E
65 19 N 44.79 E 1.49 4100.35N 3973.56E
66 16 N 46.01 E 1.61 4158.54N 4032.57E
67 21 N 46.10 E 1.16 4218.82N 4095.11E
69 39 N 44.90 E 2.65 4281.77N 4159.17E
69 46 N 45.36 E .46 4346.29N 4223.98E
69 25 N 44.43 E 1.02 4407.51N 4284.97E
68 53 N 45.05 E .83 4470.63N 4347.52E
70 4 N 44.19 E 1.50 4534.23N 4410.29E
69 49 N 44.56 E .43 4600.06N 4474.69E
70 11 N 44.10 E .61 4661.89N 4535.09E
69 54 N 44.21 E .33 4725.47N 4596.82E
69 36 N 44.56 E .46 4789.47N 4659.46E
69 11 N 45.84 E 1.35 4851.58N 4722.01E
68 58 N 43.88 E 1.93 4914.89N 4785.01E
68 46 N 44.07 E .27 4978.39N 4846.27E
68 50 N 44.11 E .07 5042.13N 4908.03E
68 9 N 43.65 E 1.10 5091.46N 4955.46E
67 40 N 43.46 E .51 5157.26N 5018.02E
67 35 N 44.06 E .61 5218.91N 5077.06E
67 31 N 43.42 E .62 5283.23N 5138.62E
69 49 N 43.81 E 2.42 5347.72N 5200.06E
72 26 N 44.76 E 2.95 5411.48N 5262.26E
72 1 N 44.82 E .46 5475.71N 5326.02E
71 53 N 44.56 E .29 5540.33N 5389.94E
71 54 N 45.02 E .46 5604.36N 5453.50E
71 40 N 44.43 E .64 5668.63N 5517.16E
5357.56
5447.11
5532.58
5623.38
5709.66
5792.52
5879.36
5969.16
6060.61
6147.01
6235.88
6325.24
6417.32
6503.77
6592.38
6681.93
6770.08
6859.39
6947.62
7036.37
7104.80
7195.58
7280.93
7369.95
7459.01
7548.09
7638.58
7729.48
7819.70
7910.16
SPEt
-SI/N DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE- 10/12/95
DATE OF SURVEY: 062095
MWD SURVEY
JOB NUMBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLOP~ATION
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORD
DEGREES DG/100 NORTH/SOUTH EAST
INATES VERT.
/WEST SECT.
9966 4825.07 4775.47
10061 4855.61 4806.01
10157 4887.41 4837.81
10252 4920.07 4870.47
10348 4952.92 4903.32
71 28 N 44.51 E .23 5732.99N 5580
71 7 N 44.57 E .37 5797.27N 5643
70 0 N 45.08 E 1.27 5861.20N 5707
70 5 N 45.24 E .18 5924.64N 5770
69 44 N 45.38 E .39 5987.82N 5834
.34E 8000.34
.60E 8090.54
.14E 8180.67
.93E 8270.62
.80E 8360.46
10442 4985.86 4936.26
10536 5019.16 4969.56
10633 5053.75 5004.15
10728 5087.89 5038.29
10819 5121.19 5071.59
69 23 N 45.25 E .39 6049.99N 5897
69 9 N 46.34 E 1.11 6111.34N 5960
69 4 N 46.98 E .62 6173.56N 6026
68 26 N 46.69 E .73 6233.65N 6090
68 38 N 45.05 E 1.69 6292.62N 6151
.66E 8448.86
.74E 8536.84
.67E 8627.43
.73E 8715.19
.52E 8799.86
10917 5157.44 5107.84
11009 5191.78 5142.18
11107 5228.77 5179.17
11200 5263.78 5214.18
11293 5299.00 5249.40
68 0 N 45.29 E .69 6356.91N 6216
67 59 N 43.57 E 1.74 6417.59N 6275
67 50 N 44.53 E .92 6483.11N 6339
67 58 N 42.64 E 1.89 6545.60N 6398
67 41 N 42.61 E .30 6609.19N 6457
.19E 8891.04
.67E 8976.01
.06E 9067.18
.54E 9153.43
.06E 9239.80
11389 5334.30 5284.70
11483 5368.52 5318.92
11578 5403.46 5353.86
11670 5437.40 5387.80
11764 5472.09 5422.49
68 48 N 42.91 E 1.20 6674.14N 6517
68 34 N 42.32 E .63 6738.68N 6576
68 24 N 42.33 E .17 6804.22N 6636
68 12 N 42.04 E .37 6867.45N 6693
68 31 N 42.56 E .61 6932.13N 6752
.12E 9328.22
.50E 9415.87
.19E 9504.46
.50E 9589.73
.35E 9677.10
11857 5506.42 5456.82
11951 5540.82 5491.22
12045 5575.12 5525.52
12141 5611.17 5561.57
12231 5645.35 5595.75
68 18 N 43.45 E .91 6995.58N 6811
68 40 N 44.54 E 1.15 7058.40N 6872
68 18 N 44.67 E .42 7120.38N 6933
67 51 N 45.16 E .66 7183.84N 6996
67 34 N 45.23 E .32 7242.62N 7055
.53E 9763.84
.19E 9851.16
.31E 9938.21
.59E 10027.83
.77E 10111.23
12324 5680.00 5630.40
12416 5714.04 5664.44
12511 5748.57 5698.97
12605 5782.43 5732.83
12700 5816.55 5766.95
68 22 N 45.65 E .95 7302.72N 7116
68 7 N 45.30 E .44 7362.55N 7177
69 10 N 45.62 E 1.15 7424.53N 7240
68 56 N 45.51 E .27 7486.49N 7303
68 43 N 45.45 E .24 7548.30N 7366
.80E 10196.87
.63E 10282.19
.61E 10370.54
.81E 10459.03
.66E 10547.17
12793 5850.53 5800.93
12887 5885.18 5835.58
12981 5920.29 5870.69
13074 5955.48 5905.88
13169 5991.44 5941.84
68 32 N 45.61 E .26 7609.15N 7428
68 13 N 45.19 E .54 7670.54N 7490
67 54 N 45.59 E .52 7731.75N 7552
67 45 N 45.41 E .24 7792.26N 7614
67 33 N 45.52 E .24 7853.60N 7676
.65E 10634.02
.90E 10721.43
.95E 10808.58
.53E 10894.91
.87E 10982.35
SPE~
-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/9
DATE OF SURVEY: 062095
MWD SURVEY
JOB NUMBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
13260 6026.56 5976.96 67 16 N 45.93 E .51 7912.55N
13353 6063.71 6014.11 65 15 N 45.39 E 2.26 7971.59N
13445 6104.22 6054.62 62 43 N 44.69 E 2.81 8030.25N
13539 6147.57 6097.97 62 31 N 44.34 E .39 8089.96N
13632 6191.99 6142.39 60 28 N 44.49 E 2.21 8148.41N
VERT.
SECT.
7737.33E 11066.78
7797.75E 11151.24
7856.50E 11234.25
7915.21E 11318.00
7972.47E 11399.82
13725 6238.58 6188.98 58 47 N 43.96 E 1.90 8205.39N
13818 6287.16 6237.56 58 25 N 43.83 E .41 8262.76N
13912 6337.36 6287.76 56 44 N 43.93 E 1.80 8319.73N
14006 6389.35 6339.75 56 39 N 43.65 E .26 8376.86N
14098 6439.81 6390.21 56 22 N 43.91 E .39 8431.95N
8027.94E 11479.34
8083.14E 11558.95
8137.92E 11637.98
8192.69E 11717.12
8245.48E 11793.40
14193 6493.61 6444.01 54 35 N 43.96 E 1.87 8488.30N
14287 6549.12 6499.52 53 7 N 44.18 E 1.58 8542.91N
14381 6607.01 6557.41 50 54 N 44.13 E 2.35 8596.10N
14474 6667.36 6617.76 48 39 N 43.96 E 2.42 8647.40N
14569 6730.88 6681.28 46 52 N 43.27 E 1.95 8698.05N
8299.77E 11871.65
8352.63E 11947.66
8404.28E 12021.79
8453.90E 12093.16
8502.17E 12163.12
14663 6796.65 6747.05 44 28 N 44.16 E 2.65 8746.72N
14757 6864.14 6814.54 43 28 N 44.07 E 1.07 8793.47N
14850 6932.09 6882.49 43 2 N 43.93 E .47 8839.46N
14944 7000.44 6950.84 42 52 N 42.32 E 1.19 8885.91N
15038 7069.70 7020.10 42 40 N 41.90 E .38 8933.44N
8548.69E 12230.44
8594.01E 12295.55
8638.42E 12359.48
8681.93E 12423.10
8724.90E 12487.12
15134 7140.39 7090.79 42 38 N 40.89 E .71 8982.30N
15227 7209.02 7159.42 41 50 N 41.56 E .98 9029.18N
15319 7278.12 7228.52 41 28 N 41.83 E .45 9075.09N
15414 7350.12 7300.52 40 7 N 42.80 E 1.56 9121.04N
15508 7422.63 7373.03 38 15 N 42.33 E 2.03 9164.58N
8767.96E 12552.16
8809o03E 12614.37
8849.93E 12675.78
8891.76E 12737.88
8931.75E 12796.96
15602 7497.44 7447.84 36 23 N 43.22 E 2.06 9206.45N
15697 7574.48 7524.88 34 40 N 46.69 E 2.80 9245.39N
15791 7652.87 7603.27 32 14 N 50.94 E 3.59 9279.52N
15826 7682.75 7633.15 31 27 N 54.50 E 5.79 9290.76N
15910 7754.20 7704.60 31 27 N 54.50 E .02 9316.13N
8970.47E 12853.96
9009.30E 12908.95
9048.22E 12960.57
9062.97E 12978.93
9098.55E 13021.97
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 13022.05 FEET
AT NORTH 44 DEG. 19 MIN. EAST AT MD = 15910
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 44.53 DEG.
SPEit ' SLrN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062095
JOB NUMBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
0 .00 -49.60 .00 N .00 E
1000 990.12 940.52 76.17 N 55.58 E
2000 1800.27 1750.67 512.55 N 418.12 E
3000 2316.31 2266.71 1131.09 N 997.41 E
4000 2685.74 2636.14 1771.05 N 1670.94 E
.00
9.88 9.88
199.73 189.85
683.69 483.96
1314.26 630.57
5000 3038.06 2988.46 2432.50 N 2332.87 E
6000 3375.70 3326.10 3088.71 N 3007.28 E
7000 3763.84 3714.24 3757.27 N 3641.37 E
8000 4146.20 4096.60 4413.71 N 4291.05 E
9000 4497.97 4448.37 5081.98 N 4946.42 E
1961.94 647.68
2624.30 662.36
3236.16 611.86
3853.80 617.64
4502.03 648.23
10000 4835.77 4786.17 5755.74 N 5602.71 E
11000 5188.40 5138.80 6411.52 N 6269.90 E
12000 5558.42 5508.82 7090.52 N 6903.80 E
13000 5927.20 5877.60 7743.66 N 7565.11 E
14000 6385.64 6336.04 8372.78 N 8188.80 E
5164.23 662.20
5811.60 647.37
6441.58 629.98
7072.80 631.22
7614.36 541.56
15000 7041.48 6991.88 8914.08 N 8707.53 E 7958.52
15910 7754.20 7704.60 9316.13 N 9098.55 E 8155.80
344.15
197.29
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPEi -SUN DRILLING SERVICES
ANCHOP~AGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062095
JOB NUMBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
0 .00 -49.60 .00 N .00 E
49 49.60 .00 .00 N .00 E
149 149.60 100.00 .31 S .33 W
249 249.60 200.00 .51 S .75 W
349 349.60 300.00 .29 N .86 W
.00
.00 .00
.00 .00
.00 .00
.01 .01
449 449.60 400.00 3.17 N .17 W
549 549.60 500.00 8.29 N 1.87 E
650 649.60 600.00 16.80 N 7.04 E
751 749.60 700.00 29.04 N 15.95 E
853 849.60 800.00 46.07 N 28.34 E
.06 .05
.22 .16
.73 .51
1.88 1.15
4.09 2.21
957 949.60 900.00 67.26 N 46.54 E
1063 1049.60 1000.00 90.94 N 70.77 E
1172 1149.60 1100.00 121.27 N 101.86 E
1284 1249.60 1200.00 158.51 N 137.97 E
1401 1349.60 1300.00 203.82 N 177.31 E
7.94 3.84
13.55 5.61
22.61 9.06
35.28 12.67
51.94 16.65
1524 1449.60 1400.00 260.08 N 222.28 E
1653 1549.60 1500.00 324.55 N 270.33 E
1784 1649.60 1600.00 392.40 N 322.05 E
1925 1749.60 1700.00 470.29 N 384.09 E
2072 1849.60 1800.00 553.42 N 451.77 E
75.21 23.27
103.53 28.32
135.00 31.46
176.16 41.16
222.76 46.60
2226 1949.60 1900.00 643.19 N 526.62 E
2399 2049.60 2000.00 747.93 N 620.75 E
2595 2149.60 2100.00 871.00 N 737.45 E
2825 2249.60 2200.00 1018.12 N 881.93 E
3092 2349.60 2300.00 1190.64 N 1059.30 E
276.63 53.87
349.41 72.78
446.38 96.97
575.61 129.23
742.52 166.91
3378 2449.60 2400.00 1376.06 N 1253.69 E
3640 2549.60 2500.00 1541.73 N 1430.25 E
3903 2649.60 2600.00 1709.04 N 1606.95 E
4170 2749.60 2700.00 1881.98 N 1783.49 E
4459 2849.60 2800.00 2073.87 N 1975.36 E
929.17 186.65
1091.15 161.97
1254.24 163.09
1420.86 166.62
1610.06 189.20
4746 2949.60 2900.00 2263.47 N 2165.75 E
5031 3049.60 3000.00 2453.50 N 2353.76 E
5315 3149.60 3100.00 2639.82 N 2542.46 E
5610 3249.60 3200.00 2834.38 N 2740.06 E
5925 3349.60 3300.00 3040.67 N 2957.04 E
1796.78 186.72
1982.20 185.42
2165.63 183.43
2360.44 194.82
2576.15 215.71
SPE[
-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062095
JOB N-UMBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SI/B-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTP~NGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
6198 3449.60 3400.00
6456 3549.60 3500.00
6710 3649.60 3600.00
6963 3749.60 3700.00
7216 3849.60 3800.00
3219.98 N 3136.53 E
3393.77 N 3298.27 E
3564.84 N 3458.16 E
3733.23 N 3618.45 E
3901.02 N 3779.32 E
2748.95 172.80
2906.56 157.62
3061.18 154.62
3214.27 153.09
3367.32 153.04
7476 3949.60 3900.00
7725 4049.60 4000.00
8009 4149.60 4100.00
8295 4249.60 4200.00
8587 4349.60 4300.00
4073.14 N 3946.57 E
4232.07 N 4108.89 E
4420.18 N 4297.39 E
4611.25 N 4485.71 E
4806.96 N 4676.68 E
3527.34 160.02
3675.59 148.25
3860.07 184.49
4046.40 186.33
4237.55 191.16
8866 4449.60 4400.00
9137 4549.60 4500.00
9404 4649.60 4600.00
9725 4749.60 4700.00
10043 4849.60 4800.00
4992.73 N 4860.16 E
5174.13 N 5034.00 E
5353.43 N 5205.56 E
5570.44 N 5419.63 E
5784.76 N 5631.27 E
4417.18 179.63
4587.62 170.43
4755.20 167.58
4976.03 220.83
5193.40 217.37
10338 4949.60 4900.00
10622 5049.60 5000.00
10896 5149.60 5100.00
11162 5249.60 5200.00
11431 5349.60 5300.00
5981.51 N 5828.40 E
6166.17 N 6018.74 E
6343.25 N 6202.40 E
6519.81 N 6374.79 E
6703.02 N 6543.94 E
5389.34 195.94
5572.78 183.44
5746.84 174.05
5913.11 166.27
6081.78 168.67
11703 5449.60 5400.00
11975 5549.60 5500.00
12243 5649.60 5600.00
12513 5749.60 5700.00
12791 5849.60 5800.00
6890.12 N 6713.94 E
7074.43 N 6887.96 E
7249.88 N 7063.08 E
7426.42 N 7242.54 E
7607.49 N 7426.95 E
6253.64 171.85
6426.16 172.52
6593.47 167.31
6764.35 170.89
6941.47 177.12
13059 5949.60 5900.00
13319 6049.60 6000.00
13544 6149.60 6100.00
13746 6249.60 6200.00
13934 6349.60 6300.00
7782.17 N 7604.29 E
7950.09 N 7775.95 E
8092.75 N 7917.94 E
8218.49 N 8040.57 E
8333.17 N 8150.87 E
7109.73 168.26
7269.87 160.14
7394.66 124.79
7496.82 102.16
7584.78 87.95
14115 6449.60 6400.00
14288 6549.60 6500.00
14448 6649.60 6600.00
14596 6749.60 6700.00
14'737 6849.60 6800.00
8442.56 N 8255.69 E
8543.37 N 8353.08 E
8632.87 N 8439.89 E
8712.61 N 8515.87 E
8783.57 N 8584.42 E
7666.31 81.53
7738.53 72.22
7798.40 59.88
7847.18 48.78
7887.69 40.51
SPE[ SUN DRILLING SERVICES
A/qCHOR3tGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062095
JOB NI3MBER: AK-MM-950628
KELLY BUSHING ELEV. = 49.60
OPER3tTOR: BP EXPLOHATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
14874 6949.60 6900.00 8851.23 N 8649.77 E 7924.98 37.29
15011 7049.60 7000.00 8919.65 N 8712.52 E 7961.44 36.46
15147 7149.60 7100.00 8988.71 N 8773.51 E 7997.41 35.98
15281 7249.60 7200.00 9056.30 N 8833.12 E 8032.03 34.62
15414 7349.60 7300.00 9120.72 N 8891.46 E 8064.54 32.50
15542 7449.60 7400.00 9180.28 N 8946.06 E 8093.11 28.58
15666 7549.60 7500.00 9233.31 N 8996.77 E 8117.16 24.05
15787 7649.60 7600.00 9278.19 N 9046.61 E 8137.60 20.43
15910 7754.20 7704.60 9316.13 N 9098.55 E 8155.80 18.21
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
SPEt 2-SUN DRILLING SERVICES
ANCHORAGE ALAS KA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062195
ELECTRONIC MULTI-SHOT SURVEY
i__JOB NUMBER: AK-EI-50056
;KELLY BUSHING ELEV. = 49 60 FT
~-.OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
0 .00 -49.60
207 207.24 157.64
296 296.38 246.78
386 386.84 337.24
475 475.92 426.32
0 0
0 25
0 19
0 27
1 35
N .00 E .00 .00N .00E .00
N 43.83 E .21 .56N .54E .78
N 43.83 E .11 .99N .95E 1.37
N 43.83 E .15 1.44N 1.38E 2.00
N 43.83 E 1.27 2.59N 2.49E 3.59
565 565.66 516.06
656 655.95 606.35
746 745.36 695.76
838 835.77 786.17
932 927.34 877.74
3 16
5 0
9 21
11 56
15 59
N 43.83 E 1.88 5.34N 5.13E
N 43.83 E 1.92 10.06N 9.66E
N 43.83 E 4.82 18.19N 17.46E
N 43.83 E 2.81 30.45N 29.23E
N 43.83 E 4.30 46.88N 45.00E
7.40
13.94
25.21
42.20
64.97
1026 1016.56 966.96
1119 1104.16 1054.56
1213 1189.18 1139.58
1306 1271.97 1222.37
1400 1352.55 1302.95
18
22
26
29
32
27 N 43.83 E 2.64 66.83N 64.16E
32 N 43.83 E 4.36 90.45N 86.83E
34 N 43.83 E 4.32 118.48N 113.74E
8 N 43.83 E 2.74 150.05N 144.04E
24 N 43.83 E 3.47 184.66N 177.27E
92.63
125.38
164.22
207.98
255.96
1495 1430.86 1381.26
1588 1505.82 1456.22
1682 1579.33 1529.73
1776 1650.85 1601.26
1868 1718.19 1668.59
35 19 N 43.83 E 3.10 222.57N 213.66E
37 41 N 43.83 E 2.54 262.60N 252.08E
39 42 N 43.83 E 2.14 305.09N 292.88E
40 59 N 43.83 E 1.37 348.92N 334.95E
45 28 N 43.83 E 4.84 394.58N 378.79E
308.50
363.98
422.88
483.64
546.93
1962 1782.98 1733.38
2057 1847.27 1797.67
2150 1909.62 1860.02
2244 1969.56 1919.96
2337 2024.70 1975.10
47
47
49
51
55
5 N 43.83 E 1.74 443.46N 425.71E
14 N 43.83 E .15 493.49N 473.74E
2 N 43.83 E 1.93 543.70N 521.94E
51 N 43.83 E 2.99 596.07N 572.21E
18 N 43.83 E 3.72 650.00N 623.98E
614.68
684.03
753.62
826.21
900.96
2430 2075.83 2026.23
2524 2124.51 2074.91
2615 2168.08 2118.48
2709 2209.89 2160.29
2802 2249.10 2199.50
57 49
60 5
62 42
64 4
66 11
N 43.83 E 2.70 705.87N 677.61E
N 43.83 E 2.41 764.21N 733.62E
N 43.83 E 2.87 821.86N 788.96E
N 43.83 E 1.47 882.07N 846.76E
N 43.83 E 2.27 943.11N 905.36E
978.40
1059.27
1139.18
1222.63
1307.24
2894 2285.21 2235.61
2988 2320.35 2270.75
3082 2354.02 2304.42
3176 2386.89 2337.29
3269 2419.30 2369.70
67
68
69
69
69
32 N 43.83 E 1.47 1004.10N 963.91E
32 N 43.83 E 1.05 1066.98N 1024.27E
26 N 43.83 E .97 1130.21N 1084.97E
30 N 43.83 E .06 1193.57N 1145.79E
42 N 43.83 E .22 1256.47N 1206.18E
1391.78
1478.93
1566.58
1654.39
1741.59
·
SPER
-SUN DRILLING SERVICES
ANCHOR3kGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/9
DATE OF SURVEY: 062195
ELECTRONIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-50056
KELLY BUSHING ELEV. = 49.60 FT.
OPERATOR: BP EXPLOP~ATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
3362 2451.77 2402.17
3456 2486.49 2436.89
3550 2523.11 2473.51
3643 2558.85 2509.25
3736 2594.21 2544.61
69 29 N 43.83 E .24 1319.44N 1266.63E 1828.87
67 6 N 43.83 E 2.53 1382.38N 1327.04E 1916.11
67 14 N 43.83 E .14 1445.14N 1387.29E 2003.10
67 33 N 43.83 E .34 1507.07N 1446.75E 2088.95
67 50 N 43.83 E .30 1569.26N 1506.44E 2175.14
3830 2629.65 2580.05
3925 2665.34 2615.'74
4019 2700.78 2651.18
4113 2736.07 2686.47
4206 2769.77 2720.17
67 47 N 43.83 E .04 1631.96N 1566.64E 2262.05
68 5 N 43.83 E .32 1695.51N 1627.64E 2350.14
67 28 N 43.83 E .66 1758.14N 1687.76E 2436.95
68 10 N 43.83 E .74 1820.61N 1747.73E 2523.54
69 41 N 43.83 E 1.61 1883.71N 1808.31E 2611.01
4301 2801.81 2752.21
4394 2833.52 2783.92
4486 2865.55 2815.95
4582 2898.43 2848.83
4678 2931.79 2882.19
70 36 N 43.83 E .98 1947.72N 1869.76E 2699.73
69 44 N 43.83 E .93 2011.17N 1930.67E 2787.68
69 41 N 43.83 E .05 2073.68N 1990.68E 2874.32
70 0 N 43.83 E .32 2138.32N 2052.73E 2963.91
69 10 N 43.83 E .86 2203.02N 2114.83E 3053.59
4770 2964.44 2914.84
4864 2996.56 2946.96
4959 3029.40 2979.80
5053 3063.17 3013.57
5148 3096.88 3047.28
69 37 N 43.83 E .48 2265.69N 2175.00E 3140.46
70 11 N 43.83 E .61 2329.07N 2235.84E 3228.31
69 12 N 43.83 E 1.05 2393.12N 2297.33E 3317.10
68 44 N 43.83 E .49 2456.49N 2358.16E 3404.92
69 40 N 43.83 E .99 2520.54N 2419.65E 3493.71
5243 3129.73 3080.13
5337 3162.18 3112.58
5433 3195.47 3145.87
5527 3227.35 3177.75
5622 3257.59 3207.99
70 3 N 43.83 E .39 2585.17N 2481.69E 3583.29
69 35 N 43.83 E .49 2648.87N 2542.84E 3671.59
69 38 N 43.83 E .06 2713.51N 2604.89E 3761.18
70 49 N 43.83 E 1.24 2777.50N 2666.32E 3849.88
72 2 N 43.83 E 1.30 2842.45N 2728.67E 3939.90
5718 3286.83 3237.23
5812 3316.05 3266.45
5908 3347.95 3298.35
6002 3381.40 3331.80
6098 3416.90 3367.30
72 27 N 43.83 E .42 2908.34N 2791.93E 4031.24
71 27 N 43.83 E 1.05 2973.06N 2854.05E 4120.94
69 31 N 43.83 E 2.04 3038.01N 2916.41E 4210.98
69 1 N 43.83 E .53 3101.77N 2977.60E 4299.34
67 28 N 43.83 E 1.61 3165.94N 3039.21E 4388.29
6194 3453.64 3404.04
6289 3490.48 3440.88
6384 3527.29 3477.69
6479 3563.68 3514.08
6574 3600.70 3551.10
67 24 N 43.83 E .07 3229.77N 3100.48E 4476.76
66 58 N 43.83 E .46 3292.95N 3161.14E 4564.34
67 37 N 43.83 E .68 3356.42N 3222.07E 4652.32
67 3 N 43.83 E .59 3419.32N 3282.45E 4739.51
67 2 N 43.83 E .02 3482.40N 3343.00E 4826.93
SPEt' -SUN DRILLING SERVICES
ANCHOP~AGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062195
ELECTRONIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-50056
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
6669 3637.86 3588.26
6764 3674.81 3625.21
6858 3712.58 3662.98
6952 3749.91 3700.31
7047 3787.41 3737.81
67 8
66 45
66 11
66 48
66 41
N 43.83 E .10 3545.83N 3403.90E
N 43.83 E .39 3608.49N 3464.05E
N 43.83 E .61 3671.10N 3524.15E
N 43.83 E .66 3733.03N 3583.60E
N 43.83 E .12 3796.01N 3644.06E
4914.86
5001.71
5088.49
5174.34
5261.63
7142 3825.56 3775.96 66 12
7238 3863.00 3813.40 67 41
7333 3898.53 3848.93 68 20
7428 3934.97 3885.37 66 33
7520 3972.14 3922.54 65 39
N 43.83 E .52 3859.16N 3704.68E
N 43.83 E 1.55 3922.62N 3765.61E
N 43.83 E .70 3986.11N 3826.55E
N 43.83 E 1.88 4049.43N 3887.33E
N 43.83 E .98 4109.95N 3945.43E
5349.16
5437.13
5525.12
5612.89
5696.77
7615 4010.65 3961.05 66 24
7707 4046.66 3997.06 67 31
7802 4081.44 4031.84 69 41
7895 4113.67 4064.07 69 46
7989 4146.64 4097.04 69 19
N 43.83 E .79 4172.43N 4005.42E
N 43.83 E 1.21 4233.51N 4064.05E
N 43.83 E 2.28 4297.53N 4125.51E
N 43.83 E .10 4360.49N 4185.95E
N 43.83 E .48 4424.30N 4247.20E
5783.39
5868.05
5956.78
6044.06
6132.49
8084 4180.24 4130.64
8174 4211.99 4162.39
8267 4243.60 4194.00
8361 4275.53 4225.93
8456 4307.91 4258.31
69 0
69 52
70 7
70 13
70 7
N 43.83 E .34 4487.98N 4308.33E
N 43.83 E .98 4549.06N 4366.96E
N 43.83 E .25 4611.71N 4427.11E
N 43.83 E .12 4675.59N 4488.43E
N 43.83 E .11 4740.38N 4550.63E
6220.76
6305.42
6392.27
6480.81
6570.62
8550 4340.34 4290.74
8646 4373.75 4324.15
8739 4406.91 4357.31
8832 4440.12 4390.52
8927 4474.69 4425.09
69 37
69 14
69 22
68 46
68 33
N 43.83 E .53 4804.24N 4611.93E
N 43.83 E .41 4868.46N 4673.58E
N 43.83 E .15 4931.80N 4734.39E
N 43.83 E .65 4994.46N 4794.53E
N 43.83 E .23 5058.33N 4855.85E
6659.13
6748.14
6835.95
6922.79
7011.32
9020 4508.82 4459.22
9114 4544.14 4494.54
9209 4580.45 4530.85
9303 4616.64 4567.04
9399 4650.49 4600.89
68 6
67 59
66 58
67 34
71 5
N 43.83 E .49 5120.29N 4915.33E
N 43.83 E .13 5183.52N 4976.03E
N 43.42 E 1.14 5246.93N 5036.46E
N 43.36 E .64 5309.73N 5095.83E
N 43.78 E 3.69 5374.76N 5157.70E
7097.21
7184.84
7272.43
7358.83
7448.59
9493 4679.85 4630.25
9588 4708.49 4658.89
9683 4737.55 4687.95
9777 4766.70 4717.10
9872 4796.00 4746.40
72 41
72 11
71 55
72 8
72 4
N 44.41 E 1.80 5439.27N 5220.19E
N 44.17 E .57 5504.05N 5283.39E
N 44.41 E .37 5568.29N 5346.07E
N 44.65 E .33 5632.38N 5409.12E
N 44.72 E .10 5696.91N 5472.94E
7538.39
7628.90
7718.65
7808.55
7899.31
SPEi f-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/9
DATE OF SURVEY: 062195
ELECTRONIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-50056
KELLY BUSHING ELEV. = 49.60 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9966 4825.50 4775.90
10060 4855.89 4806.29
10156 4887.52 4837.92
10251 4919.58 4869.98
10346 4951.75 4902.15
71 16 N 44.73 E .84 5760.19N 5535.61E
70 58 N 45.13 E .53 5823.11N 5598.38E
70 15 N 45.93 E 1.08 5886.08N 5662.53E
70 20 N 45.95 E .09 5948.37N 5726.90E
70 0 N 45.92 E .37 6010.44N 5791.03E
7988.37
8077.25
8167.13
8256.67
8345.89
10440 4984.33 4934.73
10535 5017.53 4967.93
10630 5051.40 5001.80
10724 5085.59 5035.99
10820 5120.22 5070.62
69 42 N 46.22 E .43 6072.04N 5854.97E
69 23 N 46.49 E .42 6133.50N 5919.41E
68 45 N 46.42 E .67 6194.54N 5983.63E
68 48 N 45.77 E .65 6255.62N 6047.09E
68 50 N 45.11 E .64 6318.35N 6110.79E
8434.64
8523.65
8612.20
8700.25
8789.64
10916 5155.19 5105.59
11011 5190.33 5140.73
11106 5225.39 5175.79
11199 5260.05 5210.45
11294 5294.80 5245.20
68 23 N 44.06 E 1.13 6381.93N 6173.45E
68 14 N 44.03 E .16 6445.44N 6234.89E
68 9 N 44.09 E .10 6508.42N 6295.82E
68 17 N 43.46 E .64 6571.07N 6355.84E
68 39 N 43.46 E .39 6635.02N 6416.44E
8878.90
8967.27
9054.89
9141.64
9229.73
11389 5328.93 5279.33
11483 5362.73 5313.13
11578 5397.20 5347.60
11673 5431.75 5382.15
11767 5466.23 5416.63
69 5 N 43.37 E .46 6699.17N 6477.14E
68 53 N 43.64 E .35 6763.01N 6537.72E
68 37 N 43.54 E .29 6827.21N 6598.84E
68 35 N 43.80 E .25 6891.00N 6659.73E
68 41 N 44.42 E .63 6954.33N 6721.13E
9318.03
9406.03
9494.65
9582.84
9671.04
11862 5500.69 5451.09
11957 5534.92 5485.32
12052 5569.50 5519.90
12146 5604.07 5554.47
12241 5639.54 5589.94
68 47 N 44.66 E .25 7017.46N
68 54 N 45.60 E .93 7079.88N
68 28 N 45.56 E .45 7141.91N
68 0 N 45.56 E .50 7202.58N
68 17 N 45.76 E .34 7264.40N
6783.25E 9759.60
6845.96E 9848.08
6909.27E 9936.70
6971.14E 10023.34
7034.41E 10111.78
12335 5674.20 5624.60
12428 5708.47 5658.87
12523 5742.88 5693.28
12618 5776.53 5726.93
12712 5810.10 5760.50
68 32 N 45.83 E .28 7325.47N
68 8 N 46.02 E .47 7385.53N
69 20 N 45.68 E 1.30 7447.16N
69 13 N 45.83 E .19 7509.25N
68 58 N 46.37 E .60 7570.21N
7097.20E 10199.36
7159.23E 10285.66
7222.72E 10374.13
7286.48E 10463.10
7349.82E 10550.98
12807 5844.31 5794.71
12902 5879.01 5829.41
12995 5913.62 5864.02
13091 5949.39 5899.79
13187 5985.41 5935.81
68 43 N 46.46 E .29 7631.17N
68 19 N 46.56 E .42 7691.88N
68 7 N 46.44 E .25 7751.53N
68 4 N 46.43 E .06 7812.85N
67 39 N 46.30 E .44 7873.96N
7413.88E 10639.36
7477.87E 10727.51
7540.73E 10814.12
7605.20E 10903.05
7669.29E 10991.56
SPEk
-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/9
DATE OF SURVEY: 062195
ELECTRONIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-50056
KELLY BUSHING ELEV. = 49.60 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
13282 6021.91 5972.31 67 8 N 46.08 E .59 7934.69N
13375 6060.14 6010.54 64 40 N 45.83 E 2.64 7994.14N
13469 6101.44 6051.84 62 51 N 45.59 E 1.97 8052.67N
13564 6145.33 6095.73 61 58 N 45.72 E .94 8111.40N
13658 6190.99 6141.39 59 53 N 45.08 E 2.29 8169.07N
7732.60E 11079.25
7794.06E 11164.72
7854.07E 11248.54
7914.16E 11332.54
7972.65E 11414.68
13753 6239.88 6190.28 58 1 N 43.84 E 2.26 8227.05N
13847 . 6290.51 6240.91 57 27 N 44.30 E .73 8284.69N
13942 6341.78 6292.18 57 0 N 44.08 E .51 8341.80N
14037 6393.54 6343.94 56 49 N 43.89 E .25 8398.97N
14132 6447.15 6397.55 54 46 N 44.06 E 2.17 8455.75N
8029.57E 11495.93
8085.37E 11576.15
8140.89E 11655.79
8196.07E 11735.25
8250.86E 11814.15
14228 6502.66 6453.06 54 11 N 43.66 E .70 8511.83N
14321 6558.20 6508.60 52 18 N 43.24 E 2.05 8565.82N
14416 6617.88 6568.28 50 13 N 43.17 E 2.19 8620.05N
14510 6679.10 6629.50 48 12 N 43.20 E 2.15 8671.79N
14605 6743.56 6693.96 46 24 N 42.97 E 1.90 8722.81N
8304.74E 11891.91
8355.90E 11966.28
8406.84E 12040.66
8455.39E 12111.59
8503.12E 12181.43
14698 6809.31 6759.71 44 13 N 42.55 E 2.36 8771.61N
14794 6878.02 6828.42 43 38 N 42.28 E .63 8820.48N
14888 6946.71 6897.11 43 17 N 42.29 E .38 8868.63N
14983 7015.35 6965.75 43 10 N 42.01 E .23 8916.48N
15079 7085.59 7035.99 42 56 N 41.56 E .40 8965.43N
8548.25E 12247.88
8592.91E 12314.03
8636.70E 12379.07
8680.01E 12443.55
8723.75E 12509.12
15174 7155.66 7106.06 42 28 N 40.34 E .99 9014.27N
15268 7225.28 7175.68 42 5 N 40.39 E .42 9062.51N
15363 7296.02 7246.42 41 17 N 41.89 E 1.35 9109.96N
15456 7366.80 7317.20 39 54 N 41.58 E 1.49 9155.24N
15550 7439.65 7390.05 38 8 N 41.92 E 1.91 9199.29N
8766.14E 12573.66
8807.14E 12636.80
8848.58E 12699.69
8888.97E 12760.29
8928.28E 12819.27
15644 7514.69 7465.09 36 8 N 43.33 E 2.31
15768 7616.51 7566.91 33 35 N 48.56 E 3.16
9241.11N 8966.75E 12876.06
9290.46N 9017.61E 12946.91
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 12947.20 FEET
AT NORTH 44 DEG. 8 MIN. EAST AT MD = 15768
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 44.53 DEG.
SPER -SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062195
JOB NUMBER: AK-EI-50056
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
0 .00 -49.60 .00 N .00 E .00
1000 991.65 942.05 60.83 N 58.40 E 8.35 8.35
2000 1808.44 1758.84 463.22 N 444.68 E 191.56 183.21
3000 2324.56 2274.96 1074.70 N 1031.68 E 675.44 483.87
4000 2693.32 2643.72 1745.15 N 1675.29 E 1306.68 631.25
5000 3043.91 2994.31 2420.68 N 2323.78 E 1956.09 649.41
6000 3380.39 3330.78 3099.85 N 2975.77 E 2619.61 663.52
7000 3768.67 3719.07 3764.61 N 3613.92 E 3231.33 611.72
8000 4150.25 4100.65 4431.19 N 4253.82 E 3849.75 618.42
9000 4501.22 4451.62 5106.66 N 4902.24 E 4498.78 649.03
10000 4836.15 4786.55 5782.53 N 5557.74 E 5163.85 665.07
11000 5185.94 5136.34 6437.54 N 6227.24 E 5814.06 650.21
12000 5550.13 5500.53 7107.45 N 6874.12 E 6449.87 635.81
13000 5915.22 5865.62 7754.28 N 7543.62 E 7084.78 634.91
14000 6373.06 6323.46 8376.40 N 8174.36 E 7626.94 542.16
15000 7027.61 6978.01 8925.03 N 8687.71 E 7972.39 345.45
15768 7616.51 7566.91 9290.46 N 9017.61 E 8152.25 179.86
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPER. .-SUN DRILLING SERVICES
Ai~CHORAGE ALAS KA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062195
JOB NUMBER: AK-EI-50056
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
0 .00 -49.60 .00 N .00 E .00
49 49.60 .00 .00 N .00 E .00
149 149.60 100.00 .25 N .24 E .00
249 249.60 200.00 .79 N .76 E .00
349 349.60 300.00 1.23 N 1.18 E .01
.00
.00
.00
.00
449 449.60 400.00 2.06 N 1.98 E .02
549 549.60 500.00 4.68 N 4.49 E .09
649 649.60 600.00 9.66 N 9.27 E .34
750 749.60 700.00 18.72 N 17.97 E 1.15
852 849.60 800.00 32.64 N 31.33 E 3.01
.01
.07
.25
.82
1.86
955 949.60 900.00 51.48 N 49.42 E 6.39
1061 1049.60 1000.00 75.15 N 72.14 E 11.66
1169 1149.60 1100.00 104.81 N 100.61 E 19.81
1281 1249.60 1200.00 141.18 N 135.53 E 31.83
1397 1349.60 1300.00 183.33 N 175.99 E 47.66
3.38
5.27
8.16
12.01
15.84
1518 1449.60 1400.00 232.15 N 222.86 E 68.43
1643 1549.60 1500.00 287.28 N 275.78 E 94.31
1774 1649.60 1600.00 348.14 N 334.20 E 125.15
1913 1749.60 1700.00 417.70 N 400.98 E 164.12
2060 1849.60 1800.00 495.31 N 475.49 E 211.01
20.77
25.88
30.84
38.97
46.89
2212 1949.60 1900.00 578.07 N 554.93 E 263.23
2381 2049.60 2000.00 676.02 N 648.96 E 331.91
2576 2149.60 2100.00 796.67 N 764.78 E 426.84
2803 2249.60 2200.00 943.93 N 906.14 E 554.22
3069 2349.60 2300.00 1121.72 N 1076.82 E 720.22
52.22
68.69
94.92
127.38
166.01
3356 2449.60 2400.00 1315.27 N 1262.62 E 906.55
3619 2549.60 2500.00 1490.92 N 1431.24 E 1069.81
3883 2649.60 2600.00 1667.27 N 1600.53 E 1233.94
4149 2749.60 2700.00 1844.98 N 1771.13 E 1399.80
4441 2849.60 2800.00 2042.59 N 1960.83 E 1591.43
186.33
163.26
164.12
165.86
191.63
4728 2949.60 2900.00 2236.91 N 2147.37 E 1778.75
5015 3049.60 3000.00 2431.31 N 2333.99 E 1966.20
5301 3149.60 3100.00 2624.48 N 2519.43 E 2152.05
5596 3249.60 3200.00 2824.66 N 2711.59 E 2347.02
5913 3349.60 3300.00 3041.19 N 2919.46 E 2563.46
187.32
187.45
185.85
194.98
216.43
SPEk f SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062195
JOB NUMBER: AK-EI-50056
KELLY BUSHING ELEV. = 49.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
6183 3449.60 3400.00 3222.76 N 3093.75 E 2734.31
6443 3549.60 3500.00 3395.31 N 3259.40 E 2893.57
6699 3649.60 3600.00 3565.93 N 3423.18 E 3050.34
6951 3749.60 3700.00 3732.50 N 3583.09 E 3201.98
7203 3849.60 3800.00 3899.07 N 3742.99 E 3353.60
170.85
159.26
156.78
151.64
151.62
7465 3949.60 3900.00 4073.72 N 3910.65 E 3515.56
7714 4049.60 4000.00 4238.63 N 4068.96 E 3665.10
7998 4149.60 4100.00 4429.96 N 4252.63 E 3848.56
8284 4249.60 4200.00 4623.68 N 4438.59 E 4035.12
8577 4349.60 4300.00 4822.22 N 4629.19 E 4227.95
161.96
149.54
183.47
186.56
192.83
8859 4449.60 4400.00 5012.07 N 4811.44 E 4409.48
9129 4549.60 4500.00 5193.26 N 4985.38 E 4579.83
9396 4649.60 4600.00 5372.94 N 5155.95 E 4747.05
9721 4749.60 4700.00 5594.68 N 5371.93 E 4972.36
10041 4849.60 4800.00 5810.25 N 5585.47 E 5191.86
181.53
170.34
167.22
225.31
219.50
10339 4949.60 4900.00 6006.33 N 5786.78 E 5390.15
10625 5049.60 5000.00 6191.34 N 5980.27 E 5575.93
10901 5149.60 5100.00 6371.80 N 6163.65 E 5751.98
11171 5249.60 5200.00 6552.01 N 6337.78 E 5921.79
11446 5349.60 5300.00 6738.40 N 6514.26 E 6097.26
198.29
185.78
176.05
169.81
175.47
11722 5449.60 5400.00 6923.87 N 6691.27 E 6272.47
11998 5549.60 5500.00 7106.49 N 6873.15 E 6448.94
12268 5649.60 5600.00 7282.02 N 7052.51 E 6619.08
12542 5749.60 5700.00 7459.61 N 7235.47 E 6792.98
12822 5849.60 5800.00 7640.52 N 7423.72 E 6972.57
175.20
176.47
170.15
173.90
179.59
13092 5949.60 5900.00 7813.21 N 7605.58 E 7142.56
13351 6049.60 6000.00 7978.61 N 7778.08 E 7301.66
13573 6149.60 6100.00 8116.99 N 7919.90 E 7423.64
13771 6249.60 6200.00 8238.29 N 8040.36 E 7521.76
13956 6349.60 6300.00 8350.46 N 8149.27 E 7607.36
169.99
159.09
121.99
98.12
85.59
14137 6449.60 6400.00 8458.24 N 8253.27 E 7687.47
14307 6549.60 6500.00 8557.71 N 8348.27 E 7757.55
14465 6649.60 6600.00 8647.64 N 8432.72 E 7816.39
14614 6749.60 6700.00 8727.46 N 8507.45 E 7864.58
14755 6849.60 6800.00 8800.41 N 8574.65 E 7905.45
80.12
70.08
58.84
48.19
40.87
SPEk~f-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
MILNE POINT/MPL-16
500292256600
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/12/95
DATE OF SURVEY: 062195
JOB NUMBER: AK-EI-50056
KELLY BUSHING ELEV. = 49.60 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
14892 6949.60 6900.00 8870.65 N 8638.54 E 7943.35
15030 7049.60 7000.00 8940.36 N 8701.49 E 7980.54
15166 7149.60 7100.00 9010.05 N 8762.55 E 8016.87
15301 7249.60 7200.00 9079.23 N 8821.37 E 8051.95
15434 7349.60 7300.00 9144.47 N 8879.42 E 8084.72
37.90
37.19
36.33
35.08
32.77
15563 7449.60 7400.00 9205.10 N 8933.50 E 8113.58
15687 7549.60 7500.00 9259.05 N 8984.23 E 8138.04
15768 7616.51 7566.91 9290.46 N 9017.61 E 8152.25
28.86
24.46
14.20
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
gyro/data
B.P. EXPLORATION
MILNE POINT FIELD, WELL NO. MPL-16
NORTH SLOPE, ALASKA
Gyro Multishot Survey in 7" CASING
Survey date · 02 July, 1995
Job number · AK0795G275
Gyrodata IncorpOrated
P.O. Box 79389
Houston, Texas 77279
713/461-3146
Fax: 713/461-0920
July 27, 1995
Ms. Terrie Hubble
B.P. Exploration
Prudhoe Bay Drilling Department
900 E. Benson Blvd.
Anchorage, AK 99508
MB 12-1
Re:
L Pad, #MPL-16 Milne Point Field North Slope, Alaska
Dear Ms. Hubble,
Enclosed please find one (1) original and three copies (3) of the completed survey of Well
#MPL-16
We would like to take this opportunity to thank you for using Gyrodata and we look forward
to serving you in the future.
Silly
Operations Manager
RS/gr
Serving the Worldwide Energy Industry with Precision Survey Instrumentation
gyro/data
CONTENTS
JOB NUMBER :AK0795G275
1. DISCUSSION, SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR275.DOC
gyro/data
1. DISCUSSION, SURVEY CERTIFICATION SHEET
SR275.DOC
gyro/data
DISCUSSION
JOB NUMBER' AK0795G275
Tool 080 was run in MPL-16 on ATLAS 15/32" Wireline inside 7" casing. The survey was run
without problems.
SR275.DOC
gyro/data
SURVEY CERTIFICATION SHEET
JOB NUMBER: AK0795G275
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best
of my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards
and procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the
wellsite.
Checked by :-
ROB SHOUP
OPERATIONS ENGINEER
SR275.DOC
gyro/data
2. SURVEY DETAILS
SR275.DOC
gyro/data
SURVEY DETAILS
JOB NUMBER: AK0795G275
CLIENT:
B.P. EXPLORATION
RIG:
ATLAS MAST TRUCK
LOCATION:
MILNE POINT
WELL:
MPL-16
LATITUDE:
70.495 N
LONGITUDE:
149.5W
SURVEY DATE:
02-July, 1995
SURVEY TYPE :
MULTISHOT IN 7" casing
DEPTH REFERENCE:
MAX. SURVEY DEPTH:
ROTARY TABLE EVELATION
49.1 asl
15600'
SURVEY TIED ONTO:
N/A
SURVEY INTERVAL:
100'
UTM CO-ORDINATES:
TARGET DIRECTION:
44.53
GRID CORRECTION:
CALCULATION METHOD:
MINIMUM CURVATURE
SURVEYOR:
STODDARD
SR275.DOC
gyro/data
3. OUTRUN SURVEY LISTING
SR275.DOC
A Gyro da t a D i r e c t i on a i Survey
for
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK, MILNE POINT FIELD, ALASKA
Job Number: AK0795G275
Run Date: '2-Jul-95 19:00:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.495000 deg. N
Sub-sea Correction from Vertical Reference: 49.1 ft.
Azimuth Correction-
Gyro- Bearings are Relative to True North
Proposed Well Direction: 44.530 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyro da t a D i r e c t i o na i S u rve y
B.P. EXPLORATION
WELL: L-PAD ~MPL-16I
Location: MAST TRUCK,
Job Number: AK0795G275
MILNE POINT FIELD,
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
0.0 0.00 0.00 0.0 0.0 -49.1 0.00 0.0 0.0
0 - 15600 FT. GYRO SURVEY RUN IN 4.5" TUBING.
MEASURED DEPTHS ARE REFERENCED TO AN R.K.B. HEIGHT OF 49.1 FT. ABOVE SEA LEVEL.
Page 1
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
100.0 .13 263.51 100.0 -.1 50.9 .13 .1 263.5
200.0 .46 352.14 200.0 .1 150.9 .48 .5 322.2
300.0 .67 343.09 300.0 .6 250.9 .23 1.4 338.9
400.0 1.47 4.43 400.0 1.8 350.9 .88 3.2 349.6
500.0 3.19 21.16 499.9 5.4 450.8 1.83 7.1 4.2
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
00.0 4.75 31.64 599.6 12.0 550.5 1.71 13.7 15.7
00.0 8.90 34.88 698.9 23.7 649.8 4.17 25.2 24.1
00.0 11.67 35.26 797.3 41.3 748.2 2.77 42.9 28.6
00.0 15.95 40.53 894.4 65.0 845.3 4.46 66.5 32.1
00.0 18.37 41.99 989.9 94.4 940.8 2.46 95.8 34.9
00.0 22.64 43.22 1083.6 129.4 1034.5 4.29 130.5 37.0
00'.0 27.00 43.65 1174.3 171.4 1125.2 4.36 172.3 38.6
00.0 29.74 40.84 1262.3 218.8 1213.2 3.05 219.7 39.3
00.0 33.52 37.48 1347.4 271.0 1298.3 4.17 272.1 39.3
00.0 37.32 36.13 1428.9 328.4 1379.8 3.88 330.0 38.8
00.0 37.92 36.25 1508.1 388.8 1459.0 .60 391.0 38.4
00.0 40.36 36.20 1585.7 451.3 1536.6 2.44 454.1 38.1
00.0 42.93 36.64 1660.4 517.1 1611.3 2.59 520.5 37.9
00.0 47.05 38.53 1731.1 587.2 1682.0 4.33 591.2 37.9
00.0 47.33 38.99 1799.1 660.2 1750.0 .44 664.5 38.0
.01 S .12 W
.37 N .29 W
1.33 N .51 W
3.17 N .58 W
7.05 N .52 E
13.17 N 3.70 E
23.05 N 10.30 E
37.65 N 20.56 E
56.36 N 35.33 E
78.52 N 54.81 E
104.27 N 78.54
134.74 N 107.40 E
169.93 N 139.29 E
210.63 N 172.33 E
257.05 N 207.02 E
306.31 N 243.07 E
357.22 N 280.36 E
410.68 N 319.82 E
466.67 N 362.95 E
523.87 N 408.88 E
B.P. EXPLOPJITION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK,
Job Number: AK0795G275
A Gyro da t a D i r e c t i o n a i S u rve y
MILNE POINT FIELD, ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
2100.0 47.84 39.55 1866.5
2200.0 51.20 38.09 1931.4
2300.0 54.57 41.12 1991.8
2400.0 57.09 41.04 2048.0
2500.0 59.44 41.82 2100.5
733.7 1817.4 .66 738.4 38.1
809.4 1882.3 3.54 814.4 38.2
888.8 1942.7 4.15 894.1 38.3
971.4 1998.9 2.53 976.7 38.5
1056.3 2051.4 2.45 1061.7 38.8
581.02 N 455.61 E
640.29 N 503.27 E
701.67 N 554.12
764.03 N 608.48 E
827.78 N 664.77 E
2600.0 62.20 43.70 2149.3
2700.0 64.12 43.16 2194.4
2800.0 66.01 43.09 2236.6
2900.0 67.60 41.02 2276.0
3000.0 68.60 46.65 2313.3
1143.6 2100.2 3.21 1148.8 39.1
1232.8 2145.3 1.98 1237.8 39.4
1323.4 2187.5 1.89 1328.2 39.6
1415.2 2226.9 2.48 1420.1 39.8
1508.0 2264.2 5.32 1512.6 40.0
891.86 N 724.05 E
956.66 N 785.39 E
1022.84 N 847.37 E
1091.08 N 908.93 E
1157.96 N 973.17 E
3100.0 69.28 44.66 2349.3
3200.0 69.59 42.64 2384.4
3300.0 70.07 45.24 2418.9
.3400.0 69.35 47.52 2453.6
3500.0 67.13 45.69 2490.6
1601.3 2300.2 1.98 1605.5 40.4
1694.9 2335.3 1.92 1699.0 40.6
1788.7 2369.8 2.49 1792.7 40.7
1882.5 2404.5 2.25 1886.0 41.0
1975.3 2441.5 2.80 1978.5 41.3
1223.19 N
1290.94 N
1358.52 N
1423.22 N
1487.01 N
1039.90 E
1104.52 E
1169.65 E
1237.54 E
1305.03 E
3600.0 67.50 46.14 2529.2
3700.0 67.59 47.12 2567.4
3800.0 67.51 45.17 2605.6
3900.0 67.93 44.21 2643.5
4000.0 67.78 43.70 2681.2
2067.5 2480.1 .56 2070.4 41.5
2159.8 2518.3 .90 2162.5 41.7
2252.2 2556.5 1.80 2254.6 41.9
2344.8 2594.4 .98 2347.1 42.0
2437.4 2632.1 .50 2439.6 42.1
1551.20 N
1614.66 N
1678.69 N
1744.47 N
1811.15 N
1371.30 ~
1438.48 L
1505.12 E
1570.19 E
1634.48 E
4100.0 68.15 41.37 2718.7
4200.0 69.29 44.21 2755.0
4300.0 70.16 44.36 2789.7
4400.0 69.99 44.86 2823.8
4500.0 69.72 44.69 2858.2
2530.0 2669.6 2.19 2532.3 42.1
2623.1 2705.9 2.88 2625.5 42.1
2716.9 2740.6 .88 2719.2 42.2
2810.9 2774.7 .50 2813.1 42.3
2904.8 2809.1 .31 2906.9 42.3
1879.45 N
1947.81 N
2014.97 N
2081.89 N
2148.54 N
1697.14 E
1760.43 E
1825.93 E
1891.95 E
1958.07 E
A Gy r o da t a D i r e c t i o n a i Survey
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK,
Job Number: AK0795G275
MILNE POINT FIELD, ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
4600.0 69.93 44.91 2892.7
4700.0 69.05 44.70 2927..7
4800.0 69.54 45.30 2963.1
4900.0 70.25 45.54 2997.5
5000.0 68.77 44.38 3032.5
2998.7 2843.6
3092.3 2878.6
3185.9 2914.0
3279.8 2948.4
3373.4 2983.4
.29 3000.7 42.4
.90 3094.3 42.5
.75 3187.8 42.6
.75 3281.5 42.6
1.84 3375.1 42.7
2215.14 N 2024.21 E
2281.60 N 2090.21 E
2347.75 N 2156.35
2413.66 N 2223.24 E
2479.94 N 2289.43 E
5100.0 69.07 44.07 3068.4
5200.0 69.65 44.57 3103.7
5300.0 70.25 46.61 3137.9
5400.0 69.40 43.89 3172.4
5500.0 70.15 42.93 3207.0
3466.8 3019.3
3560.3 3054.6
3654.3 3088.8
3748.1 3123.3
3841.9 3157.9
.42 3468.4 42.8
.75 3562.0 42.8
2.00 3655.8 42.9
2.69 3749.6 42.9
1.16 3843.4 42.9
2546.80 N 2354.51 E
2613.76 N 2419.90 E
2679.49 N 2487.00 E
2745.56 N 2553.66 E
2813.73 N 2618.14 E
5600.0 71.09 44.30 3240.2
5700.0 72.04 46.46 3271.8
5800.0 71.62 45.93 3303.0
5900.0 70.25 47.82 3335.7
6000.0 69.32 43.64 3370.2
3936.2 3191.1
4031.1 3222.7
4126.1 3253.9
4220.5 3286.6
4314.3 3321.1
1.60 3937.7 43.0
2.25 4032.5 43.0
.65 4127.4 43.1
2.25 4221.7 43.2
4.04 4315.4 43.2
2882.02 N 2683.21 E
2948.64 N 2750.74 E
3014.41 N 2819.31 E
3079.02 N 2888.29 E
3144.50 N 2955.47 E
6100.0 68.13 45.07 3406.5
6200.0 67.36 43.13 3444.4
6300.0 66.97 43.21 3483.2
6400.0 67.44 42.24 3521.9
6500.0 66.87 42.40 3560.8
4407.5 3357.4
4500.0 3395.3
4592.1 3434.1
4684.3 3472.8
4776.4 3511.7
1.79 4408.6 43.2
1.95 4501.1 43.3
.40 4593.3 43.3
1.01 4685.4 43.3
.58 4777.6 43.2
3211.12 N 3020.61 F
3277.58 N 3085.01 ~
3344.80 N 3148.07 E
3412.52 N 3210.61 E
3480.67 N 3272.65 E
6600.0 66.88 41.82 3600.0
6700.0 66.94 42.72 3639.3
6800.0 66.75 42.38 3678.6
6900.0 66.80 43.07 3718.0
7000.0 66.77 42.54 3757.4
4868.2 3550.9
4960.2 3590.2
5052.1 3629.5
5143.9 3668.9
5235.8 3708.3
.53 4869.5 43.2
.83 4961.5 43.2
.37 5053.4 43.2
.64 5145.3 43.2
.49 5237.2 43.2
3548.90 N 3334.32 E
3616.97 N 3396.19 E
3684.70 N 3458.36 E
3752.21 N 3520.71 E
3819.63 N 3583.17 E
A Gyro d a t a D i r e c t i o n a i Survey
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK,
Job Number: AK0795G275
MILNE POINT FIELD, ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA
SECTION DEPTH
feet feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
7100.0 66.66 42.64 3797.0
7200.0 66.49 44.31 3836.7
7300.0 67.97 43.72 3875.4
7400.0 67.04 43.20 3913.7
7500.0 65.67 44.21 3953.8
5327.6 3747.9
5419.3 3787.6
5511.5 3826.3
5603.9 3864.6
5695.5 3904.7
.14 5329.1 43.2
1.54 5420.8 43.2
1.57 5513.0 43.2
1.05 5605.4 43.2
1.64 5697.0 43.2
3887.25 N 3645.34 E
3953.84 N 3708.47 E
4020.15 N 3772.53
4087.21 N 3836.08 E
4153.43 N 3899.37 E
7600.0 66.48 44.99 3994.3
7700.0 67.44 46.71 4033.5
7800.0 69.44 44.98 4070.2
7900.0 69.77 45.01 4105.1
8000.0 69.48 43.61 4139.9
5786.9 3945.2
5878.9 3984.4
5971.8 4021.1
6065.6. 4056.0
6159.3 4090.8
1.07 5788.4 43.2
1.86 5880.3 43.3
2.57 5973.2 43.3
.33 6066.9 43.3
1.34 6160.6 43.3
4218.51 N
4282.61 N
4347.39 N
4413.68 N
4480.76 N
3963.55 E
4029.58 E
4096.29 E
4162.55 E
4228.04 E
8100.0 69.10 44.73 4175.3
8200.0 69.87 43.65 4210.3
8300.0 69.64 43.56 4244.9
8400.0 70.21 42.51 4279.2
8500.0 69.79 45.20 4313.4
6252.8 4126.2
6346.5 4161.2
6440.3 4195.8
6534.2 4230.1
6628.2 4264.3
1.11 6254.2 43.4
1.27 6347.8 43.4
.24 6441.6 43.4
1.14 6535.6 43.4
2.56 6629.5 43.4
4547.85 N
4615.00 N
4682.94 N
4751.59 N
4819.34 N
4293.22 E
4358.50 E
4423.21 E
4487.31 E
4552.41 E
8600.0 69.65 44.46 4348.1
8700.0 69.13 43.46 4383.3
8800.0 69.01 42.75 4419.0
8900.0 68.63 44.60 4455.1
9000.0 68.45 41.99 4491.7
6722.0 4299.0
6815.5 4334.2
6908.9 4369.9
7002.2 4406.0
7095.2 4442.6
.71 6723.3 43.4
1.08 6816.9 43.4
.67 6910.3 43.4
1.76 7003.5 43.4
2.44 7096.6 43.4
4885.86 N
4953.24 N
5021.43 N
5088.87 N
5156.61 N
4618.54
4683.52
4747.34
4811.73
4875.55
E
E
E
9100.0 67.49 44.12 4529.2
9200.0 68.03 42.70 4567.1
9300.0 67.96 42.75 4604.5
9400.0 70.30 45.46 4640.2
9500.0 72.54 44.77 4672.0
7187.9 4480.1
7280.4 4518.0
7373.1 4555.4
7466.5 4591.1
7561.3 4622.9
2.20 7189.3 43.4
1.42 7281.8 43.4
.09 7374.5 43.4
3.45 7468.0 43.4
2.34 7562.7 43.4
5224.34 N
5291.58 N
5359.69 N
5426.76 N
5493.65 N
4938.82 E
5002.43 E
5065.34 E
5130.37 E
5197.52 E
" A Gyro da t a D i r e c t i on a i Survey -
B.P. EXPLORATION
WELL: L-PAD %MPL-16I
Location: MAST TRUCK,
Job Number: AK0795G275
MILNE POINT FIELD, ALASKA
Page
MEASURED I
DEPTH
feet
N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL SUBSEA
SECTION DEPTH
feet feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
9600.0
9700.0
9800.0
9900.0
10000.0
72.01 42.24 4702.5
71.87 45.90 4733.5
71.97 46.33 4764.5
71.70 44.01 4795.7
71.47 43.73 4827.3
7656.5 4653.4
7751.5 4684.4
7846.6 4715.4
7941.6 4746.6
8036.4 4778.2
2.47 7657.9 43.4
3.49 7753.0 43.4
.42 7847.9 43.5
2.22 7942.9 43.5
.36 8037.8 43.5
5562.73 N
5631.03 N
5696.93 N
5763.91 N
5832.31 N
5263.09 E
5329.20 F.
5397.71
5465.09 E
5530.85 E
10100.
10200.
10300.
10400.
10500.
70.33 44.32 4860.0
70.17 45.14 4893.8
69.89 45.71 4928.0
69.72 45.48 4962.5
69.40 44.51 4997.4
8130.9 4810.9
8225.0 4844.7
8319.0 4878.9
8412.9 4913.4
8506.6 4948.3
1.27 8132.3 43.5
.79 8226.4 43.5
.61 8320.3 43.5
.27 8414.1 43.5
.96 8507.8 43.6
5900.26 N
5967.13 N
6033.09 N
6098.77 N
6165.03 N
5596.51 E
5662.74 E
5729.69 E
5796.73 E
5862.98 E
10600.
10700.
10800.
10900.
11000.
69.28 48.17 5032.7
68.51 47.18 5068.7
68 . 94 46.33 5105 . 0
68 . 21 43 . 92 5141 . 5
68.34 44.04 5178.5
8600.1 4983.6
8693.2 5019.6
8786.3 5055,.9
8879.4 5092.4
8972.3 5129.4
'3.42 8601.2 43.6
1.20 8694.3 43.6
.90 8787.3 43.7
2.36 8880.4 43.7
.17 8973.3 43.7
6229.62 N
6292.43 N
6356.28 N
6421.95 N
6488.80 N
5930.66 E
5999.63 E
6067.51 E
6133.47 E
6197.98 E
11100.
11200.
11300.
11400.
11500.
67.85 42.88 5215.8
68.19 43.99 5253.3
68.20 43.69 5290.4
68.98 41.97 5326.9
68.70 43.23 5363.0
9065.1 5166.7
9157.8 5204.2
9250.6 5241.3
9343.7 5277.8
9436.9 5313.9
1.18 9066.0 43.7
1.08 9158.8 43.7
.28 9251.6 43.7
1.78 9344.7 43.7
1.21 9437.9 43.7
6556.14 N
6623.47 N
6690.45 N
6758.73 N
6827.38.N
6261.80
6325.55 L
6389.86 E
6453 . 14 E
6516.26 E
11600.
11700.
11800.
11900.
12000.
68.50 43.17 5399.5
68.62 43.39 5436.1
68.50 44.30 5472.6
68.94 44.96 5508.9
68.72 43.67 5545.0
9529.9 5350.4
9623.0 5387.0
9716.1 5423.5
9809.3 5459.8
9902.5 5495.9
.21 9531.0 43.7
.23 9624.1 43.7
.85 9717.2 43.7
.76 9810.4 43.7
1.23 9903.6 43.7
6895.25 N
6963.01 N
7030.13 N
7096.45 N
7163.17 N
6580.00 E
6643.81 E
6708.29 E
6773.75 E
6838.89 E
A Gyro d a t a D i r e c t i o na I Survey
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK,
Job Number: AK0795G275
MILNE
POINT FIELD,
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
12100.0 68.15 45.26 5581.8
12200.0 67.85 45.04 5619.2
12300.0 68.58 45.32 5656.4
12400.0 68.36 45.24 5693.1
12500.0 69.47 45.46 5729.0
9995
10O88
10181
10274
10367
.5
.2
.1
.1
.4
5532.7
5570.1
5607.3
5644.0
5679.9
1.59 9996.6 43.7
.36 10089.3 43.7
· 77 10182.1 43.7
.23 10275.1 43.7
1.12 10368.4 43.7
7229.54 N 6904.03 E
7294.93 N 6969.76 E
7360.38 N 7035.63
7425.84 N 7101.73 E
7491.41 N 7168.10 E
12600.0 69.12 44.96 5764.4
12700.0 68.81 45.57 5800.3
12800.0 68.63 46.31 5836.6
12900.0 68.23 46.08 5873.4
13000.0 68.12 45.07 5910.5
10460
10554
10647
10740
10833
.9
.2
.4
.3
.1
5715.3
5751.2
5787.5
5824.3
5861.4
· 58 10461.9 43.7
.65 10555.2 43.8
.71 10648.3 43.8
.45 10741.2 43.8
.94 10834.0 43.8
7557.31 N
7623.00 N
7687.80 N
7752.17 N
7817.15 N
7234.48 E
7300.78 E
7367.74 E
7434.86 E
7501.16 E
13100.0 68.01 45.40 5947.9
13200.0 67.61 44.60 5985.6
13300.0 66.42 44.86 6024.7
13400.0 63.39 44.55 6067.1
13500.0 62.98 45.04 6112.2
10925
11018
11110
11201
11290
.9
.5
.6
.1
.3
5898.8
5936.5
5975.6
6018.0
6063.1
.32 10926.7 43.8
.85 11019.3 43.8
1.22 11111.3 43.8
3.04 11201.9 43.9
.60 11291.1 43.9
7882.47 N
7947.94 N
8013.34 N
8077.70 N
8141.04 N
7567.02 E
7632.50 E
7697.28 E
7760.98 E
7823.86 E
13600.0 61.15 44.12 6159.1
13700.0 59.11 43.66 6208.9
13800.0 58.76 44.06 6260.5
13900.0 56.79 44.18 6313.8
14000.0 56.94 42.24 6368.5
11378
11465
11551
11635
11719
.7
.4
.0
.6
.3
6110.0
6159.8
6211.4
6264.7
6319.4
2.01 11379.5 43.9
2.08 11466.2 43.9
.49 11551.8 43.9
1.97 11636.4 43.9
1.64 11720.1 43.9
8203.96 N
8266.45 N
8328.21 N
8388.93 N
8449.96 N
7885 87 r
- ~
7945.98 L
8005.33 E
8064.23 E
8121.55 E
14100.0 56.67 44.25 6423.2
14200.0 54.67 43.93 6479.6
14300.0 52.77 43.56 6538.8
14400.0 50.48 43.63 6600.8
14500.0 48.20 42.98 6666.0
11803
11885
11966
12044
12120
.0
.6
.2
.6
.4
6374.1
6430.5
6489.7
6551.7
6616.9
1.71 11803.8 43.9
2.01 11886.4 43.9
1.92 11967.0 43.9
2.29 12045.4 43.9
2.33 12121.2 43.9
8510.91 N
8570.21 N
8628.45 N
8685.23 N
8740.43 N
8178.88 E
8236.33 E
8292.07 E
8346.13 E
8398.16 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK,
Job Number: AK0795G275
MILNE POINT FIELD, ALASKA
MEASURED I N C L AZIMUTH VERTICAL VERTICAL SUBSEA DOGLEG CLOSURE
DEPTH DEPTH SECTION DEPTH SEVERITY DIST. AZIMUTH
feet dego deg. feet feet feet deg./ feet deg.
100 ft.
14600.0 46.12 43.48 6734.0 12193.7 6684.9 2.11 12194.5 43.9
14700.0 44.26 42.81 6804.5 12264.6 6755.4 1.92 12265.5 43.8
14800.0 43.77 42.27 6876.4 12334.1 6827.3 .61 12335.0 43.8
14900.0 43.38 41.34 6948.8 12402.9 6899.7 .75 12403.8 43.8
15000.0 43.26 41.45 7021.6 12471.4 6972.5 .14 12472.4 43.8
15100.0 43.17 40.90 7094.4 12539.8 7045.3 .39 12540.8 43.8
15200.0 42.69 38.31 7167.7 12607.6 7118.6 1.83 12608.7 43.8
15300.0 42.01 39.42 7241.6 12674.7 7192.5 1.02 12675.8 43.8
15400.0 41.05 42.55 7316.4 12740.8 7267.3 2.29 12742.0 43.7
15500.0 39.08 43.47 7393.0 12805.2 7343.9 2.05 12806.4 43.7
15600.0 37.00 44.82 7471.7 12866.8 7422.6 2.25 12868.0 43.7
Final Station Closure: Distance: 12868.01 ft Az: 43.74 deg.
Page 7
HORIZONTAL
COORDINATES
feet
8793.86 N
8845.62 N
8896.82 N
8948.19 N
8999.66 N
9051.21 N
9103.67 N
9156.13 N
9206.17 N
9253.24 N
9297.47 N
8448.38 E
8496.89 E
8543.88
8589.83 E
8635.20 E
8680.28 E
8723.70 E
8765.96 E
8809.42 E
8853.32 E
8896.22 E
A Gyro d a t a D i r e c t i on a i Survey
for
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK, MILNE POINT FIELD, ALASKA
Job Number: AK0795G275SS
Run Date: 2-Jul-95 19:00:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.495000 deg. N
Sub-sea Correction from Vertical Reference: 49.1 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 44.530 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK, MILNE POINT FIELD,
Job Number: AK0795G275SS
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH
feet deg. deg. feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
-49.1 0.00 0.00 0.0 0.0 0.00 0.0 0.0
0.00 N 0.00 E
0 - 15600 FT. GYRO SURVEY RUN IN 4.5" TUBING.
MEASURED DEPTHS ARE REFERENCED TO AN R.K.B. HEIGHT OF 49.1 FT. ABOVE SEA LEVEL.
100.0 .29 307.03 149.1 -.0 .30 .5 292.3
200.0 .56 347.70 249.1 .3 .35 1.4 330.4
300.0 1.06 353.57 349.1 1.2 .55 3.2 344.1
400.0 2.32 12.66 449.1 3.6 1.35 7.1 356.8
500.0 3.96 26.33 549.1 8.6 1.77 13.7 9.9
600.0 6.82 33.25 649.1 17.8 2.94 25.2 19.9
700.0 10.31 35.07 749.1 32..6 3.45 42.9 26.4
800.0 13.95 38.07 849.1 53.9 3.67 66.5 30.5
900.0 17.34 41.37 949.1 81.8 3.32 95.8 33.7
1000.0 21.07 42.77 1049.1 116.5 3.62 130.5 36.2
1100.0 25.79 43.53 1149.1 159.7 4.34 172.3 38.1
1200.0 29.33 41.26 1249.1 211.7 3.24 219.7 39.2
1300.0 33.60 37.45 1349.1 272.2 4.17 330.0 39.3
1400.0 37.47 36.16 1449.1 343.8 3.04 391.0 38.7
1500.0 39.21 36.23 1549.1 421.8 1.57 454.1 38.3
1600.0 42.54 36.57 1649.1 507.1 2.57 520.5 37.9
1700.0 47.12 38.65 1749.1 606.5 3.30 664.5 37.9
1800.0 47.71 39.41 1849.1 714.7 .60 738.4 38.1
1900.0 52.18 38.98 1949.1 832.6 3.72 894.1 38.2
2000.0 57.14 41.06 2049.1 973.2 2.52 1061.7 38.5
.19 N .20 W
.84 N .40 W
2.23 N .55 W
5.08 N .55 E
10.07 N 2.09 E
18.09 N 6.99 E
30.50 N 15.53 E
47.63 N 28.44 E
69.05 N 46.48 E
94.79 N 69.80 E
126.27 N 99.38 E
164.65 N 134.51 E
211.57 N 173.04 E
269.60 N 216.21 E
333.20 N 262.77 E
402.59 N 313.85 E
481.80 N 375.11 E
566.26 N 443.54 E
658.25 N 518.15 E
765.42 N 609.71 E
A Gyr oda t a D i r e c t i on a i Survey
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK, MILNE POINT FIELD,
Job Number: AK0795G275SS
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL
DEPTH DEPTH SECTION
feet deg. deg. feet feet
DOGLEG
SEVERITY
deg./
100 ft.
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
COORDINATES
feet
2100.0 62.19 43.69 2149.1
2200.0 66.51 42.44 2249.1
2300.0 69.28 44.67 2349.1
2400.0 69.44 47.23 2449.1
2500.0 67.54 46.65 2549.1
1143.2
1352.6
1600.9
1870.4
2115.6
3.20
2.08
1.99
2.28
.74
1148.8 39.1
1420.1 39.7
1605.5 40.4
1886.0 41.0
2162.5 41.6
891.61 N 723.82 E
1044.50 N 866.91 E
1222.91 N 1039.61 E
1414.92 N 1228.83 E
1584.27 N 1406.30 E
2600.0 67.91 44.14 2649.1 2358
2700.0 69.11 43.75 2749.1 2607
2800.0 69.79 44.74 2849.1 2880
2900.0 69.35 45.06 2949.1 3148
3000.0 68.91 44.24 3049.1 3416
.5
.9
.0
.9
.6
.91
2.77
.36
.81
1.18
2439.6 42.0
2625.5 42.1
2906.9 42.3
3187.8 42.5
3468.4 42.7
1754.36 N 1579.72 E
1936.64 N 1750.09 E
2130.92 N 1940.59 E
2321.58 N 2130.19 E
2510.88 N 2319.55 E
3100.0 69.98 45.73 3149.1 3684
3200.0 71.36 44.91 3249.1 3963
3300.0 69.89 46.20 3349.1 4256
3400.0 67.32 43.14 3449.1 4511
3500.0 67.04 42.35 3549.1 4748
.6
.0
.9
.2
.7
2.22
1.78
2.95
1.76
.71
3749.6 42.9
4032.5 43.0
4315.4 43.2
4593.3 43.3
4777.6 43.2
2700.85 N
2900.79 N
3104.47 N
3285.72 N
3460.18 N
2508.55 E
2702.24 E
2914.40 E
3092.65 E
3254.00 E
3600.0 66.89 42.63 3649.1 4983
3700.0 66.78 42.66 3749.1 5216
3800.0 66.97 44.12 3849.1 5448
3900.0 65.83 44.09 3949.1 5684
4000.0 68.29 45.97 4049.1 5918
.2
.3
.8
.8
.4
.72
.52
1.55
1.58
2.16
5053.4 43.2
5237.2 43.2
5513.0 43.2
5697.0 43.2
5973.2 43.3
3633.92 N
3805.36 N
3975.06 N
4145.69 N
4310.13 N
3411.75 E
3569.95 E
3728.97 E
3891.97 E
4057.92 E
4100.0 69.38 43.90 4149.1 6183
4200.0 69.71 43.44 4249.1 6451
4300.0 69.64 44.43 4349.1 6724
4400.0 68.70 44.29 4449.1 6986
4500.0 67.78 43.38 4549.1 7236
.6
.8
.6
.6
.5
1.28
.35
.72
1.58
1.79
6254.2 43.3
6535.6 43.4
6816.9 43.4
7003.5 43.4
7281.8 43.4
4498.21 N
4691.34 N
4887.79 N
5077.62 N
5259.67 N
4244.99 E
4431.05 E
4620.40 E
4800.99 E
4972.24 E
A Gyro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK, MILNE POINT FIELD,
Job Number: AK0795G275SS
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG
SEVERITY
deg./
100 ft.
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
COORDINATES
feet
4600.0 70.93 45.27 4649.1
4700.0 71.92 46.12 4749.1
4800.0 70.71 44.12 4849.1
4900.0 69.79 45.57 4949.1
5000.0 68.93 47.72 5049.1
7493.1
7799.4
8099.4
8376.5
8642.5
3.14
1.94
.97
.40
2.41
7562.7 43.4
7847.9 43.4
8132.3 43 .5
8414.1 43 .5
8694.3 43.6
5445.53 N
5664.20 N
5877.60 N
6073.32 N
6258.24 N
5149.21 E
5363.68 E
5574.62 E
5770.75 E
5962.08 E
5100.0 68.23 43.94 5149.1
5200.0 68.15 43.86 5249.1
5300.0 68.81 42.74 5349.1
5400.0 68.57 43.72 5449.1
5500.0 68.65 43.84 5549.1
8898.4
9147.4
9400.9
9656.2
9912.8
1.92
1.09
1.43
.46
1.27
8973.3 43.7
9158.8 43.7
9437.9 43.7
9717.2 43.7
9996.6 43.7
6435.65 N
6615.97 N
6800.92 N
6986.97 N
7170.53 N
6146.69 E
6318.45 E
6491.94 E
6666.83 E
6846.12 E
5600.0 68.44 45.26 5649.1
5700.0 69.27 45.18 5749.1
5800.0 68.49 46.23 5849.1
5900.0 68.00 45.38 5949.1
6000.0 64.68 44.68 6049.1
10162.9
10420.4
10679.0
10928.9
11162.7
.69
.81
.62
.34
2.26
10182.1 43.7
10461.9 43.7
10741.2 43.8
11019.3 43.8
11201.9 43.9
7347.58 N
7528.81 N
7709.71 N
7884.59 N
8050.38 N
7022.75 E
7205.78 E
7390.58 E
7569.14 E
7733.94 E
6100.0 61.54 44 . 31 6149.1
6200.0 58.84 43.97 6249.1
6300.0 56.88 42.93 6349.1
6400.0 55.75 44.10 6449.1
6500 . 0 52 . 39 43 . 57 6549 . 1
11359.9
11532.2
11689.7
11840.9
11979.2
1.71
.84
1.76
1.85
1.98
11379.5 43.9
11551.8 43.9
11720.1 43.9
11886.4 43.9
12045.4 43.9
8190.59 N
8314.61 N
8428.35 N
8538.13 N
8637.89 N
7872.69 E
7992.26 E
8101.26 E
8205.25 E
8301.06 E
6600.0 48.79 43.15 6649.1
6700.0 45.72 43.34 6749.1
6800.0 43.96 42.47 6849.1
6900.0 43.38 41.34 6949.1
7000.0 43.23 41.24 7049.1
12100.7
12208.9
12307.7
12403.2
12497.3
2.32
2.07
1.11
.75
.23
12121.2 43.9
12265.5 43.9
12335.0 43.8
12472.4 43.8
12540.8 43.8
8726.11 N
8804.96 N
8877.40 N
8948.40 N
9019.14 N
8384.66 E
8458.78 E
8526.06 E
8590.01 E
8652.23 E
A Gy r o d a t a D i r e c t i o n a i S u r v e y
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK, MILNE POINT FIELD,
Job Number: AK0795G275SS
ALASKA
Page
SUBSEA I N CL AZIMUTH VERTICAL VERTICAL DOGLEG
DEPTH DEPTH SECTION SEVERITY
feet deg. deg. feet feet deg./
100 ft.
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
COORDINATES
feet
7100.0 42.81 38.96 7149.1
7200.0 41.91 39.73 7249.1
7300.0 40.21 42.94 7349.1
7400.0 37.60 44.43 7449.1
7422.6 37.00 44.82 7471.7
12590.4 1.46
12681.3 1.14
12768.3 2.19
12849.1 2.19
12866.8 2.25'
12608.7 43.8
12742.0 43.8
12806.4 43.7
12868.0 43.7
12868.0 43.7
9090.37 N 8712.69 E
9161.16 N 8770.33 E
9226.26 N 8828.15 E
9284.76 N 8883.89 E
9297.47 N 8896.22 E
Final Station Closure: Distance: 12868.01 ft Az: 43.74 deg.
gyro/data
4. QUALITY CONTROL
SR275.DOC
Quality Control Comparisons
B.P. EXPLORATION
WELL: L-PAD #MPL-16I
Location: MAST TRUCK,
MILNE POINT FIELD,
ALASKA
Job Number - AK0795G275
/ AK0795G275
INRUN/OUTRUN Comparison
INRUN OUTRUN INRUN
Depth Inc Inc Delta Az
1000.0 18.39 18.37 .020 42.52
2000.0 47.18 47.33 -.147 39.57
2500.0 59.24 59.44 -.204 41.43
5200.0 69.58 69.65 -.076 43.66
5600.0 71.13 71.09 .036 43.81
5700.0 72.03 72.04 -.001 46.65
For Inclinations Greater than 10 degrees:
Average Inclination Difference = -.0618 deg.
Average Azimuth Difference = -.0826 deg.
OUTRUN
Az
41.99
38.99
41.82
44.57
44.30
46.46
Delta
.533
.582
-.398
-.909
-.496
.193
QUALITY CONTROL REPORT
JOB NUMBER: AK0795G275
TOOL NUMBER:
O8O
MAXIMUM GYRO TEMPERATURE:
75.0c
MAXIMUM AMBIENT TEMPERATURE:
90.0 c
MAXIMUM INCLINATION:
72.5
AVERAGE AZIMUTH:
43.6
WIRELINE REZERO VALUE:
marked line
REZERO ERROR / K:
n/a
CALIBRATION USED FOR FIELD SURVEY:
6/23/95
CALIBRATION USED FOR FINAL SURVEY:
6/23/95
PRE JOB MASS BALANCE OFFSET CHECK:
0.0
POST JOB MASS BALANCE OFFSET CHECK]:
CONDITION OF SHOCK WATCHES
UPON ARRIVAL AT RIG:
-.13
USED-.05
OK
UPON COMPLETION OF SURVEY:
ok
UPON RETURN TO ATLAS
OK
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH
TVD
NORTHING
EASTING
FIELD SURVEY 15600 37.00 44.82 7470.9
FINAL SURVEY 15600 37.00 44.82 7471.7
9296.67N
9297.47N
8895.47E
8896.22E
PREVIOUS GYRO
10200 70.17 45.14 4893.1
10220 70.31 45.97 4897.3
5966.5 N
5945.86N
5662.16E
5707.26E
SR275.DOC
gyro/data
FUNCTION TEST
JOB NUMBER: AK0795G275
5 Survey stations were collected at the measured depth shown below. The tables show the
repeatability of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft 1 2 3 4 5
1800 42.93 42.93 42.93 42.93 42.93
AZIMUTH
M.D.~ 1 2 3 4 5
1800 36.64 36.6 36 36 36
SR275.DOC
gyro/data
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR275.DOC
4 -
gyro/data
EQUIPMENT REPORT
JOB NUMBER: AK0795G275
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No, 080
GYRO SECTION A0094
DATA SECTION IMT
POWER SECTION A0052
BACKUP
TOOL No. 136
GYRO SECTION A0099
DATA SECTION A0029
POWER SECTION A0027
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
A0153
A0055
A0079
A0071
A0122
A0032
A0082
A0035
WIRELINE COMPANY:
ATLAS WIRELINE
CABLE SIZE: 15/32
RUNNING GEAR
2 1/2" System W/3"heat shield and eccentric bar, 3.5" casing rollers
TOTAL LENGTH OF TOOL:
MAXIMUM O.D.:
34.5 feet
2.25 INCHES
TOTAL WEIGHT OF TOOL:
350Lbs
SR275.DOC
gyro/data
CHRONOLOGICAL REPORT
JOB NUMBER: AK0795G275
7/01/95
1555
1815
2200
7/02/95
0700
0830
0930
1020
1130
1315
1900
2110
2325
7/03/95
0115
0200
0600
1200
ALASKA AIR
ARRIVE DEADHORSE.
CHECK TOOL O.K.
TO MILNE POINT
ARRIVE L PAD RU ATLAS ,MU TOOL
PU TOOL.
START INRUN.
WORK TOOL AT 5600' 71.5 DEG. SLOW PROGRESS.
POOH W GYRO RUN SBT.
RU TOOL W/CENTROLLERS RIH TO 15600'.
14100'
6200'
LD TOOL.
RD ATLAS AND BD TOOL.
RTN ATLAS, PROCESS SURVEY, CANT CHECK TOOL BU PS DOWN.
JOB AT E PAD
SR275.DOC
gyro/data
B.P. EXPLORATION
MILNE POINT FIELD, WELL NO. MPL-16
NORTH SLOPE, ALASKA
Gyro Multishot Survey in 5.5" drill pipe
Survey date: t5 June, 1995
Job number' AK0695G271
SR271 .DOC
Gyrodata Incorporated
P.O. Box 79389
Houston, Texas 77279
713/461-3146
Fax: 713/461-0920
June 29, 1995
Ms. Terrie Hubble
B.P. Exploration
Prudhoe Bay Drilling Department
900 E. Benson Blvd.
Anchorage, AK 99508
MB 12-1
Re:
L Pad #MPL-16, Milne Point Field, North Slope, Alaska
Dear Ms. Hubble,
Enclosed please find one (1) original and three copies (3) of the completed survey of Well
#MPL-16
We would like to take this opportunity to thank you for using Gyrodata and we look forward
to serving you in the future.
Operations Manager
RS/gr
Serving the Worldwide Energy Industry with Precision Sun/ey Instrumentation
gyro/data
CONTENTS
JOB NUMBER: AK0695G271
1. DISCUSSION, SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR271 .DOC
gyro/data
1. DISCUSSION, SURVEY CERTIFICATION SHEET
SR271 .DOC
gyro/data
DISCUSSION
JOB NUMBER: AK0695G271
Tool 080 was run in MPL-16 on ATLAS 7/32" Wireline inside 5.5" drill pipe. The survey was run
without problems. Survey results indicate a TVD discrepancy of 80' attributable to a .6 degree
error in inclination measurement at high angle.(70 deg). This error will be confirmed on a test stand
at a later date.
Tool 080 was calibrated on May 12, 1995 with a data section which had a positive-negative
referencing problem in the A/D chip. On June 23, 1995 Tool 080 was recalibrated with a different data
section, and that calibration was then applied to the survey correcting the error in inclination
measurement. We feel confident that the final survey that we are submitting herein is correct and
accurate to the standards of quality assurance required by BP Exploration.
SR271 .DOC
gyro/data
SURVEY CERTIFICATION SHEET
JOB NUMBER: AK0695G271
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best
of my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the
wellsite.
Checked by :-TIM ANDERSON
TOM STODDARD
OPERATIONS ENGINEER
SR271 .DOC
gyro/data
2. SURVEY DETAILS
SR271 .DOC
gyro/data
SURVEY DETAILS
JOB NUMBER: AK0695G271
CLIENT:
B.P. EXPLORATION
RIG:
NABORS 27E
LOCATION:
MILNE POINT
WELL:
MPL-16
LATITUDE:
70.50 N
LONGITUDE:
149.5 W
SURVEY DATE:
15-June, 1995
SURVEY TYPE :
MULTISHOT IN 5.5" drill pipe
DEPTH REFERENCE:
MAX. SURVEY DEPTH:
ROTARY TABLE EVELATION
49.1 asl
10250'
SURVEY TIED ONTO:
N/A
SURVEY INTERVAL:
100'
30' (10230-9310')
UTM CO-ORDINATES:
TARGET DIRECTION:
44.53
GRID CORRECTION:
CALCULATION METHOD:
MINIMUM CURVATURE
SURVEYOR:
STODDARD
SR271 .DOC
gyro/data
3, OUTRUN SURVEY LISTING
SR271.DOC
A Gyroda t a D i r e c t i ona i Survey
for
B.P. EXPLORATION
Job Number: AK0695G271
WELL: MILNE POINT WELL NUMBER MPL - 16, 5 INCH DRILLPIPE
Location: L PAD, MILNE POINT FIELD ALASKA
Run Date: 15-Jun-95 21:50:29
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.500000 deg. N
Sub-sea Correction from Vertical Reference: 49.1 ft.
Azimuth Corrected::
Gyro: Bearings are Relative to True North
Proposed Well Direction: 44.530 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyro da t a D i r e c t i on a i Survey
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL -
LoCation: L PAD, MILNE POINT FIELD
Job Number: AK0695G271
16, 5 INCH DRILLPIPE
ALASKA
MEASURED
DEPTH
feet
N C L AZIMUTH'VERTICAL
DEPTH
deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
0.0 0.00 0.00 0.0 0.0 -49.1 0.00 0.0 0.0
ALL MEASURED DEPTHS REFERENCED TO NABORS 27E R.K.B. HEIGHT 49.1 FEET.
0.0 - 11230.0 FEET; GYRO SURVEY RUN IN 5 INCH DRILLPIPE.
Page
HORIZONTAL
COORDINATES
feet
0.00 N 0.00
E
120.0 .30 321.14 120.0 .0 70.9 .25 .3 321.1
220.0 .62 2.88 220.0 .5 170.9 .44 1.0 341.2
320.0 .82 343.13 320.0 1.2 270.9 .31 2.3 346.8
420.0 1.99 9.02 420.0 3.0 370.9 1.31 4.6 354.4
520.0 3.33 22.88 519.8 7.1 470.7 1.48 9.0 6.0
620.0 5.30 30.75 619.6 14.3 570.5 2.05 16.3 15.9
720.0 9.15 35.59 718.7 26.6 669.6 3.90 28.5 23.7
820.0 11.68 36.65 817.1 44.5 768.0 2.53 46.3 28.5
920.0 16.10 41.94 914.2 68.4 865.1 4.60 70.0 32.3
1020.0 18.76 44.32 1009.6 98.3 960.5 2.76 99.5 35.6
1120.0 23.44 46.94 1102.8 134.3 1053.7 4.77 135.1 38.3
1220.0 27.20 44.37 1193.2 177.0 1144.1 3.92 177.6 40.0
1320.0 30.06 41.59 1281.0 224.9 1231.9 3.15 225.4 40.6
1420.0 34.17 39.60 1365.7 277.9 1316.6 4.24 278.6 40.6
1520.0 37.57 37.69 1446.7 336.2 1397.6 3.59 337.1 40.3
1620.0 38.51 36.68 1525.4 397.3 1476.3 1.12 398.7 39.8
1720.0 40.11 37.57 1602.8 460.1 1553.7 1.70 461.9 39.4
1820.0 43.52 38.53 1677.3 526.4 1628.2 3.47 528.6 39.3
1920.0 46.99 39.36 1747.7 597.0 1698.6 3.52 599.6 39.2
2020.0 47.21 38.89 1815.8 670.0 1766.7 .40 672.9 39.2
.25 N .20 W
.99 N .34 W
2.21 N .52 W
4.60 N .45 W
9.00 N .95 E
15.64 N 4.44 E
26.08 N 11.44 E
40.67 N 22.11 E
59.11 N 37.42 E
80.94 N 57.93 E
106.03 N 83.71 F
135.96 N 114.23 E
171.03 N 146.85 E
211.41 N 181.39 E
257.19 N 217.94 E
306.29 N 255.18 E
356.79 N 293.42 E
409.28 N 334.52 E
464.50 N 379.17 E
521.32 N 425.39 E
A Gyro da t a D i r e c t i on a i Survey
B.P. EXPLORATION
WELL: MILNE POINT 'WELL NUMBER MPL -
Location: L PAD, MILNE POINT FIELD
Job Number: AK0695G271
16, 5 INCH DRILLPIPE
ALASKA
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
212
222
232
242
252
0.0 48.16 39.21 1883.1
0.0 51.71 39.96 1947.5
0.0 55.11 42.58 2007.1
0.0 57.82 40.62 2062.3
0.0 60.04 41.46 2113.9
743.6 1834.0 .99 746.8 39.2
819.8 1898.4 3.59 823.3 39.2
899.9 1958.0 4.00 903.5 39.4
983.2 2013.2 3.16 986.8 39.6
1068.7 2064.8 2.33 1072.5 39.7
262
272
282
292
302
0.0 62.72 44.35 2161.8
0.0 63.96 44.34 2206.7
0.0 66.50 44.84 2248.6
0.0 68.08 45.37 ' 2287.2
0.0 68.83 45.56 2323.9
1156.4 2112.7
1245.8 2157.6
1336.5 2199.5
1428.8 2238.1
1521.8 2274.8
3.69 1160.1 40.0
1.24 1249.2 40.3
2.59 1339.8 40.6
1.65 1431.7 40.9
.77 1524.5 41.1
312
322
332
342
352
0.0 69.33 46.62 2359.6
0.0 69.50 45.74 2394.8
0.0 70.09 46.23 2429.3
0.0 69.09 46.84 2464.2
0.0 66.94 47.30 2501.6
1615.2 2310.5
1708.7 2345.7
1802.5 2380.2
1896.2 2415.1
1988.8 2452.5
1.10 1617.5 41.4
.83 1710.8 41.7
.75 1804.4 41.9
1.15 1897.9 42.1
2.19 1990.3 42.4
362
372
382
392
402
0.0 67.18 46.84 2540.6
0.0 67.87 48.17 2578.8
0.0 67.85 46.41 2616.5
0.0 67.84 47.39 2654.2
0.0 67.38 45.74 2692.3
2080.9 2491.5
2173.1 2529.7
2265.6 2567.4
2358.2 2605.1
2450.6 2643.2
.49 2082.1 42.6
1.41 2174.1 42.8
1.63 2266.5 43.0
.91 2358.9 43.1
1.59 2451.2 43.3
412
422
432
442
452
0.0 68.45 45.38 2729.9
0.0 69.78 44.16 2765.6
0.0 70.63 45.39 2799.4
0.0 69.86 44.48 2833.2
0.0 69.39 45.44 2868.1
2543.2 2680.8
2636.6 2716.5
2730.7 2750.3
2824.8 2784.1
2918.6 2819.0
1.12 2543.8 43.3
1.75 2637.2 43.4
1.44 2731.2 43.4
1.15 2825.3 43.5
1.02 2919.0 43.5
Page 2
HORIZONTAL
COORDINATES
feet
578.75 N 471.98 E
637.71 N 520.75 E
698.02 N 573.73 ~
760.35 N 629.04 E
824.95 N 685.28 E
889.21 N
953.12 N
1017.77 N
1082.88 N
1148.11 N
1212.89'N
1277.70 N
1342.91 N
1407.38 N
1470.54 N
1533.27 N
1595.69 N
1658.51 N
1721.80 N
1785.36 N
1850.24 N
1916.56 N
1983.34 N
2049.96 N
2116.29 N
745.05 E
807.51 E
871.26 E
936.60 E
1002.91 E
1070.20 E
1137.74 E
1205.24 E
1273.26 E
1341.15 E
1408.58 F
1476.71 E
1544.77 E
1612.39 E
1679.53 E
1745.69 E
1811.48 E
1877.76 E
1944.23 E
2010.47 E
A Gyro da t a D i r e c t i o na i Survey
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL -
Location: L PAD, MILNE POINT FIELD
Job Number: AK0695G271
16, 5 INCH DRILLPIPE
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
4620.0 70.18 44.88 2902.6
4720.0 68.95 44.29 2937.5
4820.0 69.83 44.17 2972.7
4920.0 70.14 44.33 3007.0
5020.0 68.60 44.20 3042.2
3012.4 2853.5
3106.1 2888.4
3199.7 2923.6
3293.7 2957.9
3387.3 2993.1
.95 3012.8 43.6
1.3'5 3106.5 43 . 6
.89 3200.1 43.6
.34 3294.1 43.6
1 . 54 3387 . 6 43 . 7
2182.46 N 2077.01
2249.19 N 2142.79
2316.26 N 2208.08
2383.56 N 2273.65
2450.58 N 2338.97
E
5120.0 68.96 44.37 3078.4
5220.0 69.75 45.65 3113.7
5320.0 70.18 44.95 3147.9
5420.0 69.47 44.69 3182.4
5520.0 70.55 45.46 3216.6
3480.5 3029.3
3574.0 3064.6
3668.0 3098.8
3761.8 3133.3
3855.8 3167.5
.39 3480.9 43.7
1.44 3574.4 43.7
.79 3668.3 43.8
.75 3762.2 43.8
1.30 385'6.1 43.8
2517.31 N 2404.05 E
2583.47 N 2470.23 E
2649.56 N 2537.01 E
2716.14 N 2603.17 E
2782.50 N 2669.71 E
5620.0 71.52 45.78 3249.1
5720.0 72.34 45.73 3280.1
5820.0 71.29 46.13 3311.3
5920.0 69.53 45.90 3344.8
6020.0 69.31 45.53 3380.0
3950.4 3200.0
4045.4 3231.0
4140.4 3262.2
4234.6 3295.7
4328.2 3330.9
1.02 3950.6 43.9
.81 4045.7 43.9
1.11 4140.6 43.9
1.77 4234.8 44.0
.40 4328.3 44.0
2848.65 N 2737.30 E
2914.98 N 2805.40 E
2981.06 N 2873.65 E
3046.49 N 2941.43 E
3111.86 N 3008.45 E
6120.0 67.62 43.18 3416.7
6220.0 67.16 42.58 3455.1
6320.0 67.03 42.23 3494.1
6420.0 67.31 42.38 3532.9
6520.0 66.82 42.56 3571.8
4421.2 3367.6
4513.5 3406.0
4605.5 3445.0
4697.6 3483.8
4789.6 3522.7
2.77 4421.3 44.0
.72 4513.6 44.0
.35 4605.7 44.0
.31 4697.8 44.0
.52 4789.9 43.9
3178.36 N 3073.47 F
3246.01 N 3136.29 L
3314.02 N 3198.41 E
3382.19 N 3260.45 E
3450.12 N 3322.63 E
6620.0 66.49 42.19 3611.5
6720.0 66.75 42.30 3651.1
6820.0 67.02 42.60 3690.4
6920.0 67.15 42.39 3729.3
7020.0 66.46 42.95 3768.7
4881.4 3562.4
4973.1 3602.0
5065.0 3641.3
5157.1 3680.2
5248.9 3719.6
.46 4881.7 43.9
.28 4973.4 43.9
.39 5065.4 43.8
.23 5157.5 43.8
.86 5249.4 43.8
3517.95 N 3384.50 E
3585.90 N 3446.21 E
3653.77 N 3508.29 E
3721.68 N 3570.51 E
3789.26 N 3632.81 E
A Gyro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL -
Location: L PAD, MILNE POINT FIELD
Job Number: AK0695G271
16~ 5 INCH DRILLPIPE
ALASKA
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL SUBSEA
SECTION DEPTH
feet feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
7120.0
7220.0
7320.0
7420.0
7520.0
66.44 43.73 3808.7
67.13 43.39 3848.1
68.38 43.29 3885.9
66.61 43.73 3924.2
65.80 43.91 3964.5
5340.6 3759.6
5432.5 3799.0
5525.0 3836.8
5617.4 3875.1
5708.9 3915.4
.71 5341.0 43.8
.76 5432.9 43.8
1.25 5525.5 43.8
1.81 5617.9 43.8
.83 5709.4 43.8
3855.93 N
3922.53 N
3989.85 N
4056.85 N
4122.87 N
3695.73 E
3759.05 E
3822.58[
3886.18 E
3949.53 E
7620.0
7720.0
7820.0
7920.0
8020.0
66.58 45.20 4004.9
67.84 45.79 4043.7
70 . 01 44 . 95 4079 . 6
69.70 44.42 4114.1
69.46 44 . 17 4148.9
5800.4 3955.8
5892.5 3994.6
5985.8 4030.5
6079.7 4065.0
6173.4 4099.8
1.41 5800.8 43.8
1.38 5893.0 43.8
2.31 5986.3 43.8
.59 6080.1 43.8
.33 6173.9 43.9
4188.06 N
4252.68 N
4318.23 N
4384.98 N
4452.06 N
4013.72
4079.47
4145.87
4211.89
4277.33
8120.0
8220.0
8320.0
8420.0
8520.0
69.26 45.14 4184.2
69.84 43.55 4219.1
69.69 44.00 4253.7
70.54 43.37 4287.7
69.69 44.47 4321.7
6267.0 4135.1
6360.7 4170.0
6454.5 4204.6
6548.5 4238.6
6642.6 4272.6
.93 6267.4 43.9
1.60 6361.1 43.9
.45 6454.9 43.9
1.04 6549.0 43.9
1.34 6643.0 43.9
4518.63 N
4585.64 N
4653.39 N
4721.39 N
4789.13 N
4343.10 E
4408.59 E
4473.50 E
4538.45 E
4603.68 E
8620.0
8720.0
8820.0
8920.0
9020.0
69.23 44.32 4356.8
69.17 44.28 4392.3
69.20 42.80 4427.9
68.80 43.30 4463.7
68.30 42.22 4500.3
6736.2 4307.7
6829.7 4343.2
6923.2 4378.8
7016.5 4414.6
7109.5 4451.2
.48 6736.7 43.9
.07 6830.1 43.9
1.38 6923.6 43.9
.61 7016.9 43.9
1.12 7110.0 43.9
4856.04 N
4922.94 N
4990.70 N
5058.92 N
5127.25 N
4669.19 F
4734.48 E
4798.87 E
4862.60 E
4925.79 E
9120.0
9220.0
9330.0
9360.0
9390.0
67.76 43.32 4537.7
67.91 42.42 4575.4
68.96 43.31 4615.9
69.89 42.92 4626.4
69.98 43.70 4636.7
7202.2 4488.6
7294.8 4526.3
7397.0 4566.8
7425.1 4577.3
7453.3 4587.6
1.16 7202.7 43.8
.84 7295.3 43.8
1.21 7397.6 43.8
3.33 7425.7 43.8
2.45 7453.9 43.8
5195.33 N
5263.20 N
5338.17 N
5358.68 N
5379.18 N
4988.76 E
5051.77 E
5121.36 E
5140o56 E
5159.89 E
A Gyro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL -
Location: L PAD, MILNE POINT FIELD
Job Number: AK0695G271
16, 5 INCH DRILLPIPE
ALASKA
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL SUBSEA
SECTION DEPTH
feet feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
H O R I Z O N T A L
COORDINATES
feet
942
945
948
951
954
0.0 71.50 44.08 4646.6 7481.6 4597.5
0.0 72.62 42.93 4655.8 7510.1 4606.7
0.0 72.67 43.20 4664.8 7538.7 4615.7
0.0 72.36 44.31 4673.8 7567.4 4624.7
0.0 72.49 43.07 4682.9 7596.0 4633.8
5.20 7482.2 43.8
5.24 7510.7 43.8
.90 7539.4 43.8
3.67 7568.0 43.8
3.98 7596.6 43.8
5399.59 N
5420.29 N
5441.21 N
5461.88 N
5482.56 N
5179.52 E
5199.17 E
5218.721
5238.51 E
5258.27 E
957
960
963
966
969
0.0 72.57 43.71 4691.9 7624.6 4642.8
0.0 72.31 43.46 4700.9 7653.2 4651.8
0.0 72.29 43.62 4710.0 7681.7 4660.9
0.0 72.24 43.66 4719.2 7710.3 4670.1
0.0 72.09 43.82 4728.4 7738.9 4679.3
2.07 7625.2 43.8
1.18 7653.8 43.8
.51 7682.4 43.8
.17 7710.9 43.8
.72 7739.5 43.8
5503.35 N
5524.07 N
5544.78 N
5565.46 N
5586.10 N
5277.92 E
5297.64 E
5317.33 E
5337.05 E
5356.79 E
972
975
978
981
984
0.0 72.16 43.87 4737.6 7767.4 4688.5
0.0 72.26 43.81 4746.7 7796.0 4697.6
0.0 72.32 44.50 4755.9 7824.6 4706.8
0.0 72.12 43.03 4765.0 7853.1 4715.9
0.0 71.83 45.12 4774.3 7881.6 4725.2
.28 7768.0 43.8
.40 7796.6 43.8
2.21 7825.2 43.8
4.70 7853.8 43.8
6.68 7882.3 43.8
5606.69 N
5627.29 N
5647.80 N
5668.43 N
5688.92 N
5376.57 E
5396.36 E
5416.27 E
5436.03 E
5455.87 E
987
990
993
996
999
0.0 71.88 44.35 4783.7 7910.2 4734.6
0.0 71.83 42.95 4793.0 7938.7 4743.9
0.0 71.86 43.68 4802.3 7967.2 4753.2
0.0 71.81 43.38 4811.7 7995.7 4762.6
0.0 71.59 43.40 4821.1 8024.1 4772.0
2.42 7910.8 43.8
4.44 7939.3 43.8
2.29 7967.8 43.8
.97 7996.3 43.8
.71 8024.8 43.8
5709.17 N
5729.80 N
5750.54 N
5771.21 N
5791.91 N
5475.93 F
5495.61 E
5515.17 E
5534.80 E
5554.36 E
1002
1005
1008
1011
1014
0.0 71.49 44.57 4830.6 8052.6 4781.5
0.0 71.40 45.00 4840.2 8081.0 4791.1
0.0 70.38 43.96 4850.0 8109.4 4800.9
0.0 70.05 44.19 4860.1 8137.6 4811.0
0.0 70.25 44.97 4870.3 8165.8 4821.2
3.73 8053.2 43.8
1.38 8081.7 43.8
4.71 8110.0 43.8
1.32 8138.2 43.8
2.54 8166.5 43.8
5812.38 N
5832.57 N
5852.79 N
5873.07 N
5893.17 N
5574.12 E
5594.16 E
5614.02 E
5633.65 E
5653.46 E
A Gyro da t a D i r e c t i o na i Survey
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL - 16, 5 INCH DRILLPIPE
Location: L PAD, MILNE POINT FIELD ALASKA'
Job Number: AK0695G271
Page
MEASURED I N C L AZIMUTH VERTICAL VERTICAL SUBSEA
DEPTH DEPTH SECTION DEPTH
feet deg. deg. feet feet feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
10170.0 70.28. 45.60 4880.5 8194.1 4831.4
10220.0 70.31 45.97 4897.3 8241.1 4848.2
10250.0 70.24 45.48 4907.4 8269.3 4858.3
Final Station Closure:
Distance:
8269.96 ft
1.98 8194.7 43.8
.71 8241.7 43.8
1.57 8270.0 43.8
Az:
43.83 deg.
5913.04 N
5945.86 N
5965.58 N
5673.53 E
5707.26 E
5727.48 ' .}
A Gyro da t a D i r e c t i on a i Survey
for
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL - 16, 5 INCH DRILLPIPE
Location: L PAD, MILNE POINT FIELD ALASKA
Job Number: AK0695G271SS
Run Date: 15-Jun-95 21:50:29
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.500000 deg. N
Sub-sea Correction from Vertical Reference: 49.1 ft.
Azimuth Corrected::
Gyro: Bearings are Relative to True North
Proposed Well Direction: 44.530 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyro da t a D i r e c t i on a i Survey
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL -
Location: L PAD, MILNE POINT FIELD
Job Number: AK0695G271SS
16, 5 INCH DRILLPIPE
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH
feet deg. deg. feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
-49.1 0.00 0.00 0.0 0.0 0.00 0.0 0.0
ALL MEASURED DEPTHS REFERENCED TO NABORS 27E R.K.B. HEIGHT 49.1 FEET.
0.0 - 11230.0 FEET; GYRO SURVEY RUN IN 5 INCH DRILLPIPE.
--
100.0 .39 333.29 149.1 .2 .31 1.0
200.0 .67 357.13 249.1 .7 .40 2.3
300.0 1.16 350.67 349.1 1.7 .60 4.6
400.0 2.38 13.07 449.1 4.2 1.36 9.0
500.0 3.91 25.19 549.1 9.2 1.65 16.3
0.00 N~l~l~q~ 0.00 E
327.0 .~i~1 ]3] ~. 24 W
342.8 1.34 N .39 W
349.0 2.90 N .50 W
357.8 5.88 N .60 E
8.9 10.95 N 1.98 E
600.0 6.45 32.19 649.1 17.9 2.60 28.5
700.0 9.93 35.92 749.1 32.1 3.48 46.3
800.0 13.13 38.39 849.1 52.4 3.21 70.0
900.0 17.07 42.81 949.1 79.4 3.92 99.5
1000.0 20.74 45.43 1049.1 113.6 3.61 135.1
18.2 18.75 N 6.53 E
25.2 30.58 N 14.73 E
29.8 46.75 N 27.16 E
33.5 67.11 N 44.93 E
36.7 91.58 N 68.86 E
1100.0 25.36 45.63 1149.1 156.2 4.33 177.6
1200.0 29.02 42.60 1249.1 207.5 3.43 225.4
1300.0 33.36 39.99 1349.1 267.6 4.03 278.6
1400.0 37.60 37.66 1449.1 338.1 3.51 398.7
1500.0 39.00 36.95 1549.1 416.5 1.30 461.9
39.2 121.36 N 99.34 E
40.4 158.30 N 135.01 E
40.6 203.52 N 174.64 E
40.3 258.70 N 219.09 E
39.7 321.73 N 266.87 E
1600.0 42.23 38.17 1649.1 501.3 2.80 528.6
1700.0 46.99 39.35 1749.1 598.5 3.45 672.9
1800.0 47.68 39.05 1849.1 706.4 .69 746.8
1900.0 51.80 40.03 1949.1 822.0 3.60 903.5
2000.0 57.17 41.09 2049.1 963.3 3.36 986.8
39.3 389.39 N 318.95 E
39.2 465.65 N 380.11 E
39.2 549.74 N 448.44 E
39.2 639.37 N 522.21 E
39.6 745.45 N 615.81 E
A Gyro da t a D i r e c t i on a i Survey
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL -
Location: L PAD, MILNE POINT FIELD
Job Number: AK0695G271SS
16, 5 INCH DRILLPIPE
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG
SECTION SEVERITY
feet deg./
100 ft.
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
COORDINATES
feet
2100.0 62.01 43.58 2149.1
2200.0 66.52 44.85 2249.1
2300.0 69.18 46.31 2349.1
2400.0 69.53 46.58 2449.1
2500.0 67.33 47.13 2549.1
1133.1 3.33
1337.8 2.57
1587.6 1.01
1855.7 .97
2101.4, .69
1160.1 39.9
1431.7 40.6
1617.5 41.3
1897.9 42.0
2174.1 42.6
872.14 N 729.17 E
1018.63 N 872.12 E
1193.80 N 1050.37 E
1379.47 N 1243.81 E
1547.16 N 1423.74 E
2600.0 67.84 47.26 2649.1
2700.0 69.16 44.73 2749.1
2800.0 69.64 44.92 2849.1
2900 . 0 69 . 24 44 . 25 2949 . 1
3000.0 68.67 44.23 3049.1
2345.6 1.00
2593.5 1.46
2867.5 1.09
3136.8 1.20
3405.0 1.32
2358.9 43.1
2637.2 43.4
2919.0 43.5
3200.1 43.6
3480.9 43.7
1713.21 N 1603.21 E
1885.93 N 1781.10 E
2080.17 N 1974.40 E
2271.21 N 2164.23 E
2463.30 N 2351.37 E
3100.0 70.16 44.94 3149.1
3200.0 71.52 45.78 3249.1
3300.0 69.50 45.85 3349.1
3400.0 67.23 42.68 3449.1
3500.0 67.10 42.46 3549.1
3671.2 .79
3950.5 1.02
4245.9 1.61
4499.0 1.04
4736.0 .40
3762.2 43.8
4045.7 43.9
4328.3 44.0
4513.6 44.0
4789.9 43.9
2651.86 N 2539.30 E
2848.70 N 2737.35 E
3054.42 N 2949.56 E
3235.39 N 3126.43 E
3410.49 N 3286.36 E
3600 · 0 66 · 74 42 . 29 3649 . 1
3700 · 0 66 . 80 42 . 67 3749 . 1
3800.0 67.16 43.38 3849.1
3900.0 66.11 43.84 3949.1
4000 . 0 68 . 17 45 · 66 4049 . 1
4968.4 .29
5203.2 .54
5435.0 .77
5673.8 1.20
5906.6 1.52
4973.4 43.9
5249.4 43.8
5525.5 43.8
5709.4 43.8
5986.3 43.8
3582.41 N 3443.04 E
3755.61 N 3601.79 E
3924.34 N 3760.76 E
4097.59 N 3925.27 E
4262.60 N 4089.52 E
4100.0 69.46 44.17 4149.1
4200.0 69.71 43.94 4249.1
4300.0 69.33 44.35 4349.1
4400.0 68.96 43.10 4449.1
4500.0 67.81 43.05 4549.1
6173.8 .33
6442.0 .61
6715.6 .67
6978.4 .93
7230.2 1.06
6267.4 43.9
6454.9 43.9
6736.7 43.9
7016.9 43.9
7295.3 43.8
4452.36 N 4277.63 E
4644.36 N 4464.85 E
4841.29 N 4654.75 E
5031.09 N 4836.61 E
5215.84 N 5007.80 E
A Gyr od a t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL -
Location: L PAD, MILNE POINT FIELD
Job Number: AK0695G271SS
16, 5 INCH DRILLPIPE
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG
DEPTH DEPTH SECTION SEVERITY
feet deg. deg. feet feet deg./
100 ft.
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
COORDINATES
feet
4600.0 71.80 43.77 4649.1
4700.0 72.28 43.99 4749.1
4800.0 70.48 44.05 4849.1
4858.3 70.24 45.48 4907.4
7489.3 5.21
7803.4 .87
8106.8 4.41
8269.3 1.57
7510.7 43.8
7825.2 43.8
8110.0 43.8
8270.0 43.8
5405.21 N 5184.85
5632.60 N 5401.51
5850.97 N 5612.23
5965.58 N 5727.48
Final StatiOn Closure: Distance: 8269.96 ft Az: 43.83 deg.
gyro/data
4. QUALITY CONTROL
SR271 .DOC
gyro/data
QUALITY CONTROL REPORT
JOB NUMBER: AK0695G271
TOOL NUMBER:
O80
MAXIMUM GYRO TEMPERATURE:
75.0c
MAXIMUM AMBIENT TEMPERATURE:
38.0 c
MAXIMUM INCLINATION:
72.0
AVERAGE AZIMUTH:
43.6
WIRELINE REZERO VALUE:
20' correction
REZERO ERROR / K:
n/a
CALIBRATION USED FOR FIELD SURVEY:
12 MAY 1995
CALIBRATION USED FOR FINAL SURVEY:
23 JUNE 1995
PRE JOB MASS BALANCE OFFSET CHECK:
-.33
POST JOB MASS BALANCE OFFSET CHECKt '
-.04
CONDITION OF SHOCK WATCHES
UPON ARRIVAL AT RIG:
OK
UPON COMPLETION OF SURVEY:
OK
UPON RETURN TO ATLAS
OK
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING EASTING
FIELD SURVEY 10250 69.50 46.16 4998.6 5948.70 N 5688.50 E
FINAL SURVEY 10250 70.24 45.48 4907.4 5965.58 N 5727.48 E
SR271 .DOC
gyro/data
FUNCTION TEST
JOB NUMBER' AK0695G271
5 Survey stations were collected at the measured depth shown below. The tables show the
repeatability of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft 1 2 3 4 5
1820 43.3 43.3 43.3 43.3 43.3
AZIMUTH
M.D. ft 1 2 3 4 5
1820 38.2 38.2 38.2 38.2 38.2
SR271 .DOC
Quality Control Comparisons
B.P. EXPLORATION
WELL: MILNE POINT WELL NUMBER MPL -
Location: L PAD, MILNE POINT FIELD
16, 5 INCH DRILLPIPE
ALASKA
Job Number : AK0695G271
/ AK0695G271
INRUN/OUTRUN Comparison
INRUN OUTRUN INRUN
Depth Inc Inc Delta Az
500.0 3.28 3.32 -.040 22.06
1000.0 18.22 18.67 -.457 44.89
1800.0 43.27 43.27 -.001 38.08
2000.0 46.91 46.92 -.012 39.12
10230.0 69.50 69.50 -.002 45.72
For Inclinations Greater than 10 degrees:
Average Inclination Difference = -.1181 deg.
Average Azimuth Difference = .43097 deg.
OUTRUN
Az
22.70
43.99
38.09
38.29
45.71
Delta
-.639
.893
-.009
.833
.008
gyro/data
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR271 .DOC
gyro/data
EQUIPMENT REPORT
JOB NUMBER: AK0695G271
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. 080
GYRO SECTION A0094
DATA SECTION A0025
POWER SECTION A0052
BACKUP
TOOL No. 136
GYRO SECTION A0099
DATA SECTION A0029
POWER SECTION A0027
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
A0153
A0055
A0079
A0071
A0122
A0032
A0035
WIRELINE COMPANY:
CABLE SIZE:
ATLAS WIRELINE
7/32"
RUNNING GEAR
2 1/4" System
TOTAL LENGTH OF TOOL:
MAXIMUM O.D.:
34.5 feet
2.25 INCHES
TOTAL WEIGHT OF TOOL:
240Lbs
SR271 .DOC
gyro/data
CHRONOLOGICAL REPORT
JOB NUMBER: AK0695G271
6/15/95
1700
1815
1900
2000
2100
2230
2330
6/16/95
0000
0130
0235
0400
043O
0500
0600
O83O
0900
CHECK TOOL. O.K.
ERA TO KUPARUK.
ARRIVE KUPARUK.
TO E PAD
MU TOOL, RUN ON LOW FREQ.
PU TOOL RE SPOT,ZERO TOOL. MU PACK OFF. START INRUN.
PUMP TOOL DOWN
10230'.
9300'
5800'
1500'
LD TOOL.
RD ATLAS AND BD TOOL.
PROCESS SURVEY W/DOWNHOLE CAL.
TVD DESCREPANCY 80', PROBABLY OUR ERROR,
DRILL AHEAD W/MWD
STAND BY FOR JOB AT E PAD AND C PAD.
SR271 .DOC
WELL LOG TILANSM1TTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
3001 Porcupine Drive
Anchorage, Alaska 99501 6~ ¢ ' O<~ O
lVI-WD Formation Evaluation Logs - MPL-16,
September 27, 1996
AK-MM-950628
The technical data listed below is being submitted herewith. Please acknowledge receipt
by returning a signed copy of this transmittal letter to the attention off
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
MPL-16:
1 LDWG formatted LIS tape with verification listing.
API#: 50-029-22566-00
RECEIVED
OCT 0 5
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Inc. Company
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 29 December 1995
Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
MPL-16
DESCRIPTION
1-PFC/PERF FINAL BL+RF
i GR/CCL FINAL BL+RF
Run # Z2
Run # 2
ECC No.
6453.03
6453.04
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
~ ~63-7803
Received by: Date:
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 22 November 1995
Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
DESCRIPTION
1 CCL FINAL BL+RF
i GR/CCL FINAL BL+RF
1 PLS FINAL BL+RF
1 PLS FINAL BL+RF
Run ~ 1
Run ~ 1
Run # 1
Run # 1
ECC No.
6453.02
6527.00
6528.00
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518 ~A
Received by: _ Dat~//
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 17 November 1995
Transmittal of Data
Sent by: US MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
MPL-16 ~
DESCRIPTION
GR/CCL FINAL BL & RF Run # 1
PLS FINAL BL & RF Run # 1
PFC/PERF FINAL BL&RF .Run ~ 1
PLS STATIC FIN BL&RF Run # 1
PFC/PERF FINAL BL&RF Run # 1
PFC/PERF FINAL BL&RF Run # 1
ECC No.
6453.01
6478.02
6480.02
6485.01
-Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Received ~ /''~ Date:
CiRI L. LIN I~i c; E~ R ~,/I C I~ c~
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - MP L-16, AK-MM-950628
November 17, 1995
The technical data listed below is being submitted herewith.
returning a signed copy of this transmittal letter to the attention of:
Please acknowledge receipt by
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
MPL-16:
2" x 5" MD Resistivity and Gamma Ray Logs:
2" x 5" TVD Resistivity and Gamma Ray Logs:
1 Blueline
1 Rev. Folded Sepia
1 Blueline
1 Rev. Folded Sepia
2" x 5" MD Neutron and Density Logs:
1 Blueline
1 Rev. Folded Sepia
2" x 5" TVD Neutron and Density Logs:
RECEIVED
NOV £ 1 1995
Alaska Oil & Gas COns.
Anchorage
1 Blueline
1 Rev. Folded Sepia
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Ino. Company
STATE OF ALASKA
AI,/-~oKA OIL AND GAS CONSERVATION COMMISSiOr,
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon __ Suspend Operation Shutdown __ Re-enter suspended well
Alter casing __ Repair well Plugging __ Time extension __ Stimulate __
Change approved program X Pull tubing __ Variance__ Pedorate __ Other ,
& Change to Injector
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB)
BP Exploration (Alaska) Inc. Development__ KBE = 40 feet
Exploratory __
3. Address Stratigraphic 7. Unit or Property name
P. O. Box 196612, Anchorage, Alaska 99519-6612 Service x Milne Point Unit
4. Location of well at surface 8. Well number
3604' NSL, 5148' WEL, SEC. 8, T13N, RIOE
At top of productive interval
N/A
At effective depth
N/A
At total depth
2479' NSL, 1399' WEL, SEC. 33, T14N, RIOE
MPL-16i
9. Permit number
95-80
10. APl number
50- 029-22566
11. Field/Pool
Milne Point Unit/Kuparuk Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
15910'
7716'
Length Size
105' 30"
9012' 12-1/4"
15834' 8-1/2"
feet Plugs (measured)
feet
feet Junk (measured) ,¢""? ~ ;
feet / ~ .~ ,~ .,-..
~'~li ~/
Cemented Measured d~'~// rue vertical depth
250 sx Arctic Set I (Approx.) 105' 105'
1740 sx PF 'E; 250 sx 'G' 9048' 4510'
275 sx 'G' 15867' 7682'
measured Not been perf'd at this time
true vertical
Tubing (size, grade, and measured depth) Not been ran at this time
Packers and SSSV (type and measured depth) Not been installed at this time
13. Attachments
Description summary of proposal X Detailed operations program __
BOP sketch
14. Estimated date for commencing operation
October 1, 1995
16. If proposal was verbally approved Oil~ Gas
Name of approver Date approved Service Water Injector
17. I hereby ceG[fy that the foregoing is true and correct to the best of my knowledge.
Signed /~/q~ ~',,-._ .~,~,/J TitleSeniorDrillin~qEn~Tineer
' / ' ' ' FOR COMMISSION USE ONLY
Conditions of approval: Notify Oommission so representative may witness
Plug integrity ~ BOP Test /,/'" Location clearance
Mechanical Integrity Test
Approved by order of the Commission
15. Status of well classification as:
Suspended__
I Approval No.
Subsequent form required 10- ,yo'f Approved Copy
Original Signed By Returnee /
SUBMIT IN TI~IPLICATE
Form 10-403 Rev 06/15/88
Miine Point L-16i RWO/Completion
Objective:
The objective of workover is to complete L-16i as a water injector in Kuparuk
sands with 3-1/2" 9.3# L-80 NSCT tubing and a permanent latched packer. L-
16i was original planned as Kaparuk producer but due to lack of oil zone, we
will complete this well as water injector to support reservoir pressure in this fault
block. L-16i will be perforated with TCP and 1,000 psi underbalance from
15,520' - 15,779'MD for optimizing the injectivity.
Background:
MP L-16i was drilled and cased by Nabors rig 27E on 9/27/95. The well was left
with 259' of cement at bottom which requires clean out. The cement bond logs
were run and shown good cement across the injection zones. Currently, the
well has not been perforated and has diesel from surface to 2,000' MD and
source water to PBTD below the diesel.
Work Scope:
1. MIRU Nabors 4ES. ND tree and NU BOPs.
,
RIH w/6" bit and 7" casing scraper to drill out cement to PBTD from
15,520' - 15,779'MD.
.
Perform tubing conveyed perforation 5 spf from 15,486' to 15,609'MD w/
1,000# underbalance.
,
Run 6" GR/JB with slickline to 15,500'MD (20' above top perfs) or clean
out wellbore w/BHA is needed.
,
Run 3.5" 9.3# L-80 NSCT tubing with a 7" latched permanent packer.
Freeze protect well down to 2,000'TVD with diesel. Set packer @ +/-
15,470'MD (50' above top perfs) and test tubing and annulus to 3,500
psi.
6. RDMO Nabors 4ES. Place well in water injection service.
Timing:
Rig Nabors 4ES is expected to move on this well 10/5/95. The workover is
expected to take 5 days.
D H September 29, 1995
Wellhead: xx:(xx
,6i
Prop(~:,,.u Completion
ORIG. KB. ELEV = 52' (Nabors 27E)
ORIG. GL. ELEV = 16.6' (Nabors 27E)
133/8''48#/ftK-55BTS I 110'I
KOP = 400'
Hole Angle: 67-72*
From 2876 to 13260 MD
Angle at TD=-31
"S" Shape Profile
9-5/8' 40 #/FT L-80 BTC I
9048 MDI
3-1/2" L-80 NSCT Tubing
Baker SAB Packer set at x,xxx'
PERFORATION SUMMARY
REF LOG:
SIZE SPF I
INTERVAL
DATE
REV. BY
OPEN/SQZ'D
COMMENTS
6/17/95 DBPJDMR 7' Casing Run
Otis XN nipple at x,xxx'
Wireline Reentry Guide at x,xxx'
i
PBTD I 15779 MD
7" 26~/ft L-80 BTC I 15867 MD
MILNE POINT UN~
WELL L-16i
APl NO: 50-029-22566
BP EXPLORATION (AK)
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
Date:
RE:
12 July 1995
Transmittal of Data
ECC #: 6453.00
ANCHORAGE Sent by: PRIORITY MAIL
AK, 99501. Data: SBT/GR
Dear Sir/Madam,
Reference: BP
MPL-16
MILNE POINT
NORTH SLOPE, AK
Enclosed, please find the data as described belo
Tapes/Diskettes: 1 LDWG TAPE + LIS Run # 1
Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services
e O--B~Street .........
201
Received by
Anchorage, AK 99518
..~~/~_to (907) 5~3-7803
~~/ Date:
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date:
RE:
6 July 1995
Transmittal of Data
ECC #: 6453.00
Sent by: PRIORITY MAIL
Data: SBT/GR
Dear Sir/Madam,
Reference:
BP
MPL-16
MILNE POINT
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Prints/Films: 1
SBT/GR FINAL BL+RF Run # 1
Please sign and return to- Attn Rodney m P/~aulso--~n Atlas Wire~fne Servi~
6oo B
Suite~O1
_ Anc~race~18 ~UL ~ ~ ~ U
MEMORANDUM
TO:
David Jollh'~,//~
Chairman
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: June 5, 1995
' ,I
THRU' Blair Wondzeil, ~
P. I. Supervisor
FROM: Lou Grimaldi,
Petroleum Inspector
FILE NO'
SUBJECT:
EWQJFECD.DOC
Diverter inspection
Nabors rig #27-E
BPX well # MPL-16
Milne Point Unit
PTD # 95-80
Monday, June 5, 1994: I witnessed the Diverter function test on Nabors rig #27-E,
drilling BPX well # MPL-16 in the Milne Point Unit.
Due to the Kuparuk river bridge being washed out I had to fly over. The test was
originally scheduled for Sunday. The speed head had been welded on
approximately 10" too high and had to be repositioned. During this time I found
that the Vent line valves would not open completely. This problem was resolved
by reworking the linkage between the valves. The vent line valve on the stack
was sluggish in opening when the Diverter was actuated. This was resolved by
tearing the valve apart and cleaning its components.
Once these problems were resolved the rest of the test went well. The
accumulator functioned well with a overall recharge time of 1 minute and 8
seconds.
SUMMARY: I witnessed the Diverter function test on Nabors rig #27-E.
Attachments: EWQJFECD.XLS
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Diverter Systems Inspection Report
Operation:
Drlg Contractor: Nabors Rig No.
Operator: BPX Oper. Rep.:
Well Name: MPL-16 Rig Rep.:
Location: Sec. 8 T. 13N R. 10E
Development
27-E
Date:
X Exploratory:
PTD # 95-80 Rig Ph. #
James Robertson
Merdian Umiat
6/5/95
Brian Buzby
MISC. INSPECTIONS: ACCUMULATOR SYSTEM:
Location Gen.: OK Well Sign: OK Systems Pressure: 2900 psig
Housekeeping: OK (Gen.) Drlg. Rig: OK Pressure After Closure: 1500 psig
Reserve Pit: N/A Flare Pit: N/A 200 psi Attained After Closure: min. 15 sec.
Systems Pressure Attained: 1 min. 8 sec.
DIVERTER SYSTEM INSPECTION: Nitrogen Bottles: eight
Diverter Size: 20 in. 2200 psig
Divert Valve(s) Full Opening: no
Valve(s) Auto & Simultaneous: no MUD SYSTEM INSPECTION' Light Alarm
Vent Line(s) Size: 10 in. Trip Tank: P P
Vent Line(s) Length: 100 ft. Mud Pits: P P
Line(s) Bifurcated: yes Flow Monitor: P P
Line(s) Down Wind: yes
Line(s) Anchored: yes GAS DETECTORS: Light Alarm
Turns Targeted / Long Radius: yes Methane P P
Hydrogen Sulfide: P P
i i iii!!i:ii,~i.i::.~i ....... DIVERTER SCHEMATIC
I
I j North
i
0 C) 0 (.%~ 0 J · = ~ 0
Pipe Shed
Divert Valves Wind
Ca ~np
Non Compliance Items 2 Repair Items Withir N/A Day (s) And contact the Inspector @ 659-3607
Remarks: Vent line valves would not open fully, reworked mechanism and functioned properly. Diverter vent valve w(
not open before annular closed, clean valve and replumb hydraulics and functioned properly.
would
Distribution
orig. - Well File
c- Ope#Rep
c- Database
c - Trip Rpt File
c- Inspector
AOGCC REP.:
OPERATOR REP.:
EWQJFECD.XLS
Louis R. Grimaidi
DVTRINSP.XLT (REV. 1/94)
ALASKA OIL AND GAS
'CONSERVATION COMMISSION /
TONY KNOWLE$, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Jtme 1, 1995
Adrian Clark
Drilling Engineer Supervisor
BP Exploration (Alaska) Inc.
P O Box 196612
Anchrage, AK 99519-6612
Re:
Milne Point Unit MPL-16
BP Exploration
Permit No: 95-80
Sur. Loc. 3604~NSL~ 5148%VEL, Sec. 8, T13N, RIOE, UM
Btmhole Loc. 2297qNSL, 1271%VEL, Sec. 33, TI4N, R10E, UM
Dear Mr. Clark:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035.
Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the
surface casing shoe must be given so that a representative of the Commission may witness the test.
Notice may be given by contacting the Commission petroleum field inspector on the North Slope
pager at 659-3607.
dlf/Enclosures
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2O AAC 25.OO5
la. Type of work Drill [] Redrill BJlb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil []
Re-Entry [] DeepenFII Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 49.8 feet Milne Point Unit - Kuparuk Pool
3. Address 6. Property Designation
P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355017
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
3604' NSL, 5148' WEL, SEC. 8, T13N, RIOE Milne Point Unit
At top of productive interval 8. Well number Number
2143' NSL, 1455' WEL, SEC. 33 T14N, RIOE MPL-16 2S100302630-277
At total depth 9. Approximate spud date Amount
2297' NSL, 1271' WEL, SEC. 33 T14N, RIOE 06/02/95 $200,000.00
,12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uDand'rVD)
!property line
ADL 047434, 2297' feet No close approach feet 2560 15843 MD/7665 TVD feet
16. To be completed for deviated wells 117. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 300 feet Maximum hole angle s9 o Maximum surface 2933 psig At total depth (TVD) 7349'/3668 psig
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 91# NT8OLHE Weld 80' Surface 32' 112' 112' 250 sx Arcticset I (Approx.)
12-1/4" 9-5/8" 40# L-80 Btrc 9338' Surface 31' 9369' 4521 ~x 'E'/250 sx 'G'/250 sx 'E'
8-1/2" 7" 26# L-80 btrc ,15813' Surface 30' 15843' 7665' 260 Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations. "~ ,,~[& z.['z ~ ~
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural ~6~V ~9
Conductor
Surface
Intermediate
Production ~ ~'1' '~ '~
Liner
Perforation depth' measured ~,t~¥~ 0~t &.j~f~Cft0f~6;~$ ~,0tl~..?
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid prograr¢ [] Time vs depth Blot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[]
certif ~at'")thC'~j '-e clog [ true and correct to the best of my knowledge/~/-~
21. I hereby ~./.,~C.,/ ~
Signed . Title Drilling En~lineer Supervisor Date
Commission Use Only
Permit Number IAPI number IApproval date See cover letter
Conditions of approval Samples required [] Yes I~.No Mud log required []Yes ~ No
Hydrogen sulfide measures [] Yes J~' No Directional survey required [] Yes [] No
Required working pressure for I~Pn~all~, ~bQE~:~fM; I~8;5M; I-I10M; I-I15M;
Other:
Dav,d W. Johnstonby order of ~//~_../,~//,~,
Approved
by
Commissioner ~ne commission Date
Form 10-401 Rev. 12-1-85 Submit ~f iplicate
Well Name:
Well Plan
IMPL-16
Summary
]Type of Well (producer or injector): ] Kupamk Producer ]
I
R£Crclx/red
i~la~ga 0it .& Bas Cons. O0mmis~i0n
~.,~ gn0h0rz
Surface Location: 3604' FSL 5148' FEL Sec 08 T13N R10E UM., AK.
2143' FSL 1455' FEL Sec 33 T14N R10E UM., AK.
Target Location:
Bottom Hole
Location:
2297' FSL 1271' FEL Sec 33 T14N R10E UM., AK.
]AFE Number: I 330140 I
Estimated Start Date: June 2,
1995
I Rig: I Nabors 27E
IOperating days to drill
and case:
7665'
Well Design (conventional, slimhole,
etc.):
Formation Markers:
22
]KBE: 149'
Ultra Slimhole, 7" Longstring
Formation Tops MD TVD Formation Pressure/EMW
Base Permafrost 1909' 1749' n/a
MA n/a n/a n/a
NA (Top Schrader) 7558' 3979' 1626 psig / 8.0 ppg
OA 8161' 4199' 1726 psig / 8.0 ppg
Base Schrader Bluff 8859' 4449' 1809 psig / 8.0 ppg
Top HRZ truncated truncated n/a
Base HRZ truncated truncated n/a
Kupark D Shale 15200' 7229' n/a
Top Kupamk A 15423' 7349' 3668 psig / 9.6 ppg
Target 15470' 7379 ' 3684 psig / 9.6 ppg
Total Depth 15843' 7665' n/a
Casing/Tubing Program:
Hole Csg/ Wt/Ft Grade Con Length Top Btm
Size Tbg MD/TVD MD/TVD
O.D.
30" 20" 914/ NT80LHE weld 80 32/32 112/112
12 1/4" 9 5/8" 404/ L-80 btrc 9338' 31/31 9369/4521
8 1/2" 7" 264/ L-80 btrc 15813' 30/30 15843/7665
N/A (tbg) 2-7/8" 6.54/ L-80 EUE 15101' 29/29 15130/7149
8rd
Internal yield pressure of the 7" 26g casing is 7240 psi. Worst case surface pressure
would occur with a full column of gas to the reservoir at 7349' TVDSS. Maximum
anticipated surface pressure in this case assuming a reservoir pressure of 3668 psi is 2933
psi, well below the internal yield pressure rating of the 7" casing.
Logging Program:
I Open Hole Logs:
Surface
Intermediate
Final
ICased Hole
Logs:
None GR/Resistivity
None
LWD OR/Resistivity/Neutron/Density
None
A gamma ray log will be obtained from surface to TD. Mud Logging is not required.
Mud Program:
Special design
considerations
INone- LSND freshwater mud
Surface Mud Properties: I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.6 50 15 8 10 9 8
to to to to to to to
9.6 90 35 15 30 10 15
Intermediate Mud Properties: N/A I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
Production Mud Properties: I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.0 40 10 3 7 8.5 6-8
to to to to to to to
10.2 50 15 10 20 9.5 4-6
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular
preventer will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
I KOP: 1300'
Maximum Hole Angle:
169 degrees
Close Approach Well: None
There are no close approach wells for drilling MPL-16.
Disposal:
Cuttings Handling: CC2A
Fluid Handling: The other wells on the MPL-pad extension are MPL-17, MPL-29 and
MPL-24i have not been arctic packed and are available for annular injection via the 9-5/8" x
7" annulus. The PEs may be perforating and fracing any of the wells on this pad while
MPL-16 is being drilled. Check with the PE supervisor prior to injecting waste fluid down
any other annulus to ensure injection will not interfere with their operations. After
cementing the 7" casing on this well, MPL-16, and allowing the cement to cure 6 hours the
annulus may be used for fluid disposal. Ensure the annulus is freeze protected after
injecting any freezable fluids.
RECEIVED
ktas~ Oil & Gas Cons. Commission
Anchor~.,
Annular Injection: During break-up and while the Kupamk River bridge is out all
cuttings from this well (MPL-16) will require tracking to the reserve pit on A-pad. When
the Kupamk bridge is re-built cuttings will need transporting to CC2 for processing and
disposal. Fluids may be injected into the 7" x 9-5/8" annulus on MPL-17, MPL-29 and
MPL-24i. MPL-16's annulus may be used after allowing the cement on the 7" casing
cement job to cure 6 hours following CIP.
AREA WELL PREV VOL PERMITTED PERMITTED DATES
INJECTED (BBL) VOL (aBE)
Milne Point L-17 0 35,000 1/1/95-1 '2/31/95
Milne Point L-29 0 35,000 1/1/95-12/31/95
Milne Point L-24i 0 35,000 1/1/95-12/31/95
FREEZE PROTECTION:
Pay close attention to annulii being used for disposal so to avoid freezing. Sometimes the
annulii are kept open by ensuring that an adequate volume (+60 bbls) is injected every 6-12
hours. This practice is more economical than pumping 60 bbls of diesel freeze protection
every time the pumps are shut down; however, if this practice is used, it is important that
the injection frequency into the annulus be adequate to prevent freeze ups -- the drillers
must communicate to each other the last time the annunlus was injected into
to avoid freezing.
MPL-16 Proposed
Summary of Operations
o
.
.
,
10.
11.
12.
13.
14.
15.
16.
17.
Drill and Set 20" Conductor. Weld an FMC landing ring for the FMC Gen
5 Weelhead on the conductor.
Prepare location for rig move.
MIRU Nabors 27E drilling rig.
NU and function test 20" Diverter system. Build Spud Mud.
Drill a 12-1/4" surface hole to 9369' md (4521' tvd). (Note: This hole
section will be LWD logged with GR/Res). Run and cement 9-5/8" casing.
ND 20" Diverter, NU and Test 13-5/8" BOPE. Run Wear Bushing.
RIH w/PDC bit and PDM (motor). Test the 9-5/8" casing to 3500 psig. Drill out
float equipment and 10 feet of new formation, Perform a LOT.
Drill 8-1/2" hole to TD at 15843' MD (7665' TVD). (Note: This hole section
will be logged LWD with Triple Combo (GR/Res/Neu/Dens).
Pull Wear Bushing, and Change Pipe Rams to 7". Run and Cement 7" casing. Test
casing to 3500 psi and freeze protect wellbore to 2000' TVD with diesel.
ND BOPE and NU dry hole tree. Release rig to MPL-16.
Note: This well will be perforated, hydraulically fractured and cleaned out with
coiled tubing without a rig and prior to running the ESP completion. Following the
stimulation the well will be left with a retrievable bridge plug (RBP) set 500' above
the perforations and kill weight brine in the wellbore.
MIRU workover completion unit. ND dry hole tree. NU BOPs and test.
PU and RIH with 2-7/8" EUE 8rd tubing with RBP retrieving tool. Release RBP
and POH standing back tubing.
RIH with Electric Submersible Pump (ESP) completion on 2-7/8" EUE 8rd tubing.
Set BPV. ND BOPE and NU tree. Pull BPV and set two way check. Test tree.
RDMO with workover/completion rig.
Cons. comrnis o
Anchor~ '~
RECEiVing
ivlAY 3 1 1B95
DRILLING HAZARDS AND RISKS:
&las~ .Oil & Gas Cons. Commission
See the Milne Point L-Pad Data Sheet prepared by Pete Van Dusen for~ ~' gnch0r~ .~
general recap of the originall3 wells drilled by Conoco on L-Pad plus the L-
14 and L-15 wells recently drilled by BPX.
There will be no close approaches while drilling this well.
There will be intensive construction throughout L-pad as the construction
group installs facilities, VSMs and flowlines. Ensure personnel and vehicles
use caution while approaching and while on L-pad.
Surface casing will be deep set across the Scrader Bluff this well due to the
high step out (+12,500' Departure). It is important that we drill the hole with
minimum doglegs, concentrating on maintaining a low solids mud, and
practicing good hole cleaning procedures.
Lost Circulation: Lost circulation while drilling the production interval has
been a problem in on 4 different L-pad wells. The Kuparuk sands and a
number of shallower intervals are highly fractured. Wells L-07, L-08, L-09
and L-11 lost varying amounts of mud (from 70 to 220 bbls) drilling through
or near the top of the Kuparuk sands. Be prepared to treat these losses with
LCM treatments.
Have the LCM materials outlined in the Drilling Fluid Program
on location and recommended pills ready to address the Lost
Circulation Problem when drilling into the Kuparuk Sand.
Stuck Pipe Potential: Stuck pipe has occurred on 3 wells on this pad at the
interface between the Kalubik and D-shale (called the Kuparuk cap rock).
These wells and the corresponding depths at which they were stuck were: L-06
@ 6871' ss, L-07 @ 6859' ss, L-11 @ 6835' ss.
While running 7" casing on MPL-29 the last two joints (TD was
14025'MD/7208'TVD) that were run acted sticky and repeatedly packed off
for a period of time. Landing the casing hanger required working the casing
string and circulating in order to get casing in place.
Kick Tolerance: The surface casing setting depth for this well allows a
kick tolerance of 98 bbl influx (Gas) based on a 12.5 ppg LOT at the 9-5/8"
casing shoe and a estimated reservoir pressure of 3684 psig (9.6 ppg
equivalent MW). Trip Schedules are required for all trips. All trips will be
performed with a trip tank or one pit isolated for use as a trip tank.
Formation Pressure: The maximum expected pore pressure for this well is
9.6 ppg EMW (3668 psi @ 7379 TVD). This is virgin reservoir pressure,
there has been no injection or production in this region.
Safety: The MPU Construction group will probably be installing VSMs on
this pad as MPL-16 is drilled. Ensure the rig crews and contractors associated
with rig operations use caution and are aware of the progress and status of
operations with regard to VSM installations while working on this pad.
The MPU PE group will be perforating, hydraulic fracturing and cleaning out
wells with coiled tubing shortly after the rig drills and completes them. This
will make the near rig area congested and as a result hazardous. Ensure
personnel use caution moving around adjacent production activities. Check
with the PE supervisor prior to injecting fluids down an annulus on any wells
that the PE group may be working on.
RtCt'IV. tD
Gas Cons.
~Ancho~ ~:
BPX-Shared Services Drilling
Ataska State Plane: Zone4
~ilne P~ ' MPL
MPL- 16
MPL- 16 IAFp?
VERTICAL V]g~r
SCALE 500
~RTIC~ SRC~ON
D.O0'
D. Or
4-63'
L~.uO'
O ' e L ~ ~ L)
~4.04'
1370
38L9
S740
6964
69.00' ~7550
69.00' R tDD69 ND
HALL[ ))URTB~
~/30/~J5 3ml~
F~t-Qe~ N:ux~ TVD NS [~_. D-id XGrid Y
rmr~e~ ~'187379 9099 ~ 9948 K 5~36L5 6040950
CA~]NG POINT DATA
51E4 ~ 4987
9069 91t7
DO HD lnc Azl TVD
9 5/8 in 9969 69.00' 44.97' 4581
7 in 15843 4m. O0'45.09' 7665
,,,
KD Ina Az I, TVD
TEK IN 0 O.OO' 40.00'
XOP / START 30m O.nO' 40.PO° 300
OF BUILD R
~.O0*/tO0 Ft
STARTBF BUILD 5DO 4.00' 40.00' 500
END DF BUILD 1800 43.00' 40,00' 1659
B. Pe~eaFPnst 19~9 43.~0' 49.00° i749
STAA~ DF ~DOO 43.00' 4~,00' IDt5
CURVE: E
3,0~°/tDD F%
El'/) DF CU.RVK 2977 69.00' 44.~7" ~302
5500 69.00' 44.~7"
ffSO0 69.00'44.97'
T. Sah~a~eP / 7559 DB-OD° 44.97' 3979
HA Sands
B. Sah~xde. 8869 69,00'44.87' 4449
ID069 69.00' 44.B7' 4979
tO069 69.09' 44.B7' 4875
START O~ 13405 69.9~" 44,~7°
CURVE ~
~.00'/[00 Ft
ENO D~ CURVE 14855 40.96' 45,00' 6908
T. KupG~uk i5431 40.00" 45.00' 7349
T=~oet 5/18 / 15470 40.~0'45.00' 7379
TKU&3
B. ~pa~u~ 15543 40.00*45,00' 7435
N/$ E./V
O~ OK
ON OE
SN 4£
395 ~ 331
45~ N 379
499 N 419
0763 N ~636
~763 N ~637
4~4 N 399~
499~ N 4656
5766 N 5646
5786 5646
7993 ~ 7843
9820 N 8668
908~ ~ 9930
9099 N 6948
9133 N 899~
t t 199
LP3GG
-300
DS30 IO~O0 tOSOO t t~PO t~6O 13ODO i3~OD
500 rOOD 1300 EDDP ED00 3000
VgRTICAL SECTION PI,~IP.: 44.53
~OE:~TPM ~_~S~ HP~_LIBURTOM DRIII IM~
..-Shared Services I ling
~taska S~a~e plan~: Zone¢
Mflne Pt · MPL
MPL-[6
MPL- 16 Wp7
['
SC~ 600 ~, / D~rO~
HALLIBURTnN
$/30/95 P. mS8 pm
3500 4000 4500 5000 5500 6000 6500 7000 ?500 8000 8500 9000 9500 lO000
[Te.-ge?. ~./lg 7~7, 90,9, N 9~4' [ B53,IS ,040':I0 [
CASING POINT DATA
OD MD Inc Ars TYD N/S
9 5/8 fn 9069 69,00' 44,67' 4S~1 S1~4 N 4987
7 fn [5843 40.00° 45.00° 7665 9~69 N ~117
lvRO~
7t~91
13001.63
CRITICN., POINT DATA
MD Inc ~1, Tvg N/$ F_~'g
TIE IN 0 0.00' 40.00' 0 O N 0
KDP / START 300 0,00' 40,00° 300 0 N O
~,00'/100 f~
START DF ~UTL~)500 4.00" 40,00' 500 $ N 4
e 3,00'/[00
~ DF ~O[L,a [~00 43.00' 40,00' [6~9 395 N 331
~, Pe~¢eos~ [90~ 43.00' 40,00' 1749 4~ ~ 379
START OF ~O00 43.00' 40,00' 1815 499 4L9
CURVC e
3,00-/100 ~
END DF CURVE ~B?? 6S,O0' 44.87' ~308 IDaC ~ 908
~550Q 69.00' ~,87' 3R4R E763 N R637
T. S~ee / 7SS8 ~.OO' 44,87* 3979 ~Z~4 N 399E
~. $C~der B869 69,00' 44.87' 4449 499~ N 4856
10069 69.00' ~,87' ~879 ~86 N 5646
100~9 69.00' ~.87' 4~7~ S7~6 N 5646
START OF 134~69.00' 44.87' 6075 7993 N 7843
~Rv~ e
~ DF ~EVE [~gS~ 40.00' 45.00' 6~Og gg~o N 8668
.Kapok [543[ 40.00' 4~.00' 7349 90g~ N B~30
~g~ ~[B / [5470 40.00' 4S. DO' 7379 9099 N 8~4g
T~
~, ~p~ 1~543 4O. OO' 4~.00' 7435 9[33 N Bgg&
_._ ,-, RMIT CHECKLIST
PROGRAM: exp []
/1
dev~ redrll [] serv []
o~/OSF sso~ 0 /d
ADMINISTRATION
APPR DATE
1. Permit fee attached ..................
2. Lease number appropriate ...............
3. Unique well name and number ..............
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundaz-y.
6. Well located proper distance from other wells ......
7. Sufficient acreage available in drilling unit ......
8. If deviated, is wellbore plat included ........
9. Operator only affected party ..............
10. Operator has appropriate bond in force .........
11. Permit can be issued without conservation order .....
12. Permit can be issued without administrative approval.
13. Can permit be approved before 15~day wait .......
ENGINEERING
APPR DATE
14. Conductor string provided ............... ~ N
15. Surface casing protects all known USDWs ........ ~ N
16. CMT vol adequate to circulate on conductor & surf csg..~ N
17. CMT vol adequate to tie-in long string to surf csg . . ..~Y ~
18. CMT will cover all known productive horizons ....... .~ N
19. Casing designs adequate for C, T, B & permafrost .... ~ N
20. Adequate tankage or reserve pit ............ ~ N
21. If a re-drill, has a 10-403 for abndnmnt been approved.._~f__-N-----
22. Adequate wellbore separation proposed .......... ~ N
23. If diverter required, is it adequate .......... ~Y~ N
24. Drilling fluid program schematic & equip list adequate ~ N
25. BOPEs adequate .................... .~ N
26. BOPE press rating adequate; test to ~Oq3~ psig.~ N
27. Choke manifold complies w/API RP-53 (May 84). ' .... ..~Y~ N
28. Work will occur without operation shutdow~ ....... ~Y~ ~_~
29. Is presence of H2S gas probable ............. Y N~ (~ '~
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures ..... ~
31. Data presented on potential overprp.~_u~e~zon~.'~ .-~--.. Y N
32. Seismic analysis 9f ~s_ha,t~ow'--g'~'~"'~nes. · . , ...... Y N
33. Seabed .c0nditioh-~survey (if off-shore) ......... Y N
DATE 34 ........ COh{~Ct name/phone for weekly progress reports ..... Y N
~ ............. [exploratory only]
,,
GEO_LO~:
ENGINEERING: COMMISSION:
, ,
Co~m~ants/Instructions:
-' - A:tFORMS%cheklist rev ~
Well HistorY File
APPENDIX
Information Of detailed nature that is not
particularly germane to the Well Permitting'Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organiZe this category of information.
~pe Subfile 2 is type:
TAPE HEADER
PRUDHOE BaY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
.
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
MWD RUN 3
AK-MM- 950628
M. HANIK
J. GAFFANEY
MPL-16
500292256600
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
25-SEP-96
MWD RUN 4
M. HANIK
J. ROBERTSON
MWD RUN 5
M. HANIK
J. ROBERTSON
8
13N
10E
3604
5148
51.72
50.22
16.60
RECEIVED
OCT 0 ;5 't996
"Ala~kaOil & Gas Cons.
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 9.625 9048.0
8.500 15910.0
MWD - GR/EWR4/CNP/SLD.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
ANAIULAR AND CRITICAL VELOCITIES CALCULATED USING THE
POWER LAW MODEL.
MWD RUNS 1 AND 2 ARE DIRECTIONAL ONLY AND NO DATA IS
PRESENTED.
MWD RUN 3 IS DIRECTIONAL, DUAL GAMMA RAY (DGR/SGRC) AND
ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4).
MWD RUNS 4 AND 5 ARE DIRECTIONAL, DUAL GAMMA RAY
(DGR/SGRC), ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY
(EWR4), COMPENSATED NEUTRON POROSITY (CNP/SPSF) AND
STABILIZED LITHO DENSITY (SLD).
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves;
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
RP
NPHI
RHOB
$
BASELINE
CURVE SHIFT DATA
.5000
START DEPTH
5737.0
5728.0
9043.0
9043.0
CURVE FOR SHIFTS: UNKNOWN
(MEASURED DEPTH)
BASELINE DEPTH GR
14494.5 14498.0
14497.5 14501.0
14613 . 5 14614 . 0
14713 . 5 14718 . 5
14736 . 0 14739 . 0
14773 . 0 14776 . 0
14777 . 5 14781 . 5
14802.5 14806.5
14804.0 14807.5
14818.5 14820.5
14871.5 14875.0
14882.0 14887.0
14890.5 14895.5
14935.0 14939.0
14937.5 14941 . 5
14967 . 5 14971 . 5
14968.5 14972.5
14995.5 15001.0
14999.0 15005.0
15053.0 15058.5
15078.0 15083.5
15098.5 15103.0
15105.5 15110.5
15106.5 15112.0
15118.0 15123.0
15120.0 15125.0
15136.5 15141.0
15138.5 15143.5
15170.5 15176.0
15178.0 15183.5
15201.5 15208.0
15219.0 15223.5
15238.5 15243.0
15239.5 15244.0
15263.5 15268.0
15318.5 15326.5
15352.5 15360.0
15369.0 15376.0
15370.0 15377.5
15437.0 15444.5
15451.0 15458.5
all bit runs merged.
STOP DEPTH
15883.0
15855.0
15863.0
15872.0
EQUIVALENT UNSHIFTED DEPTH
15460.0
15479.5
15500.5
15511.0
15520.0
15549.0
15563 .0
15567.0
$
MERGED DATA SOURCE
PBU TOOL CODE
$
REMARKS:
154 .5
15487.0
15508.0
15518.0
15527.0
15556.0
15569.5
15574.0
BIT RUN NO MERGE TOP
3 5847.0
4 9090.0
5 15343.0
MERGED MAIN PASS.
MERGE BASE
9090.0
15343.0
15910.0
CN
WN
FN
COUN
STAT
/? ?SHIFT. OUT
$
: BP EXPLORATION (ALASKA)
: MPL-16
: MILNE POINT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
13 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 RPX MWD 68 1 OHMM 4
3 RPS MWD 68 1 OHMM 4
4 RPM MWD 68 1 OHMM 4
5 RPD MWD 68 1 OHMM 4
6 RHOB MWD 68 1 G/C3 4
7 DRHO MWD 68 1 G/C3 4
8 PEF MWD 68 1 BN/E 4
9 NPHI MWD 68 1 PU-S 4
10 FCNT MWD 68 1 CPS 4
11 NCNT MWD 68 1 CPS 4
12 FET MWD 68 1 HR 4
13 ROP MWD 68 1 FPHR 4
4 90 310 01 I
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 350 01 1
4 90 356 99 1
4 90 358 01 1
4 90 890 01 1
4 90 334 31 1
4 90 334 30 1
4 90 180 01 1
4 90 810 01 1
52
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 1138
Tape File Start Depth = 15940.000000
Tape File End Depth = 5700.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
286735 datums
Tape Subfile: 2
1276 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 5738.0
EWR4 5730.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9038.0
9031.0
12-JUN- 95
ISC 2.02
3.93
MEMORY
9090.0
5847.0
9090.0
0
65.3
70.2
TOOL STRING (TOP TO BOTTOM) ~
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
DGR DUAL GAMMA RAY
$
TOOL NUMBER
P0351CRG8
P0351CRG8
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
12.250
.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING~TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
SPUD MUD
9.30
44.0
9.0
800
7.0
1.300
1.060
1.200
2.000
85.0
106.0
85.0
85.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS:
CN
WN
FN
COUN
STAT
MWD RUN 3.
$
BP EXPLORATION (ALASKA)
MPL-16
MILNE POINT
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 RPX MWD 68 1 OHMM 4
3 RPS MWD 68 1 OHMM 4
4 RPM MWD 68 1 OHMM 4
5 RPD MWD 68 1 OHMM 4
6 FET MWD 68 1 HR 4
7 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 180 01 1
4 90 810 01 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 220
Tape File Start Depth = 9100.000000
Tape File End Depth = 5700.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 54409 datums
Tape Subfile: 3 285 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 8899.0 15283.0
EWR4 8872.0 15256.0
CNP 9046.0 15263.0
SLD 9046.0 15272.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
19-JUN-95
ISC 2.02
3.93
MEMORY
15343.0
9090.0
15343.0
0
41.8
72.4
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD LITHO-DENSITY
DGR DUAL GAMMA RAY
$
TOOL NUMBER
P0363CRNSLDG6
P0363CRNSLDG6
P0363CRNSLDG6
P0363CRNSLDG6
BOREHOLE A1XrD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
8.500
9048.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND- LT
10.20
45.0
9.5
600
4.8
1.000
.520
2.200
1.900
75.0
152.0
70.0
65.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
SANDSTONE
2.65
HOLE CORRECTION (i :
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 4.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPL-16
: MILNE POINT
: NORTH SLOPE
: ALASKA
.0
30
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
13 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 RPX MWD 68 1 OHMM 4
3 RPS MWD 68 1 OHMM 4
4 RPM MWD 68 1 OHMM 4
5 RPD MWD 68 1 OHMM 4
6 RHOB MWD 68 1 G/C3 4
7 DRHO MWD 68 1 G/C3 4
8 PEF MWD 68 1 BN/E 4
9 NPHI MWD 68 1 PU-S 4
10 FCNT MWD 68 1 CPS 4
11 NCNT MWD 68 1 CPS 4
12 FET MWD 68 1 HR 4
13 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 350 01 1
4 90 356 99 1
4 90 358 01 1
4 90 890 01 1
4 90 334 31 1
4 90 334 30 1
4 90 180 01 1
4 90 810 01 1
52
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 722
Tape File Start Depth = 15350.000000
Tape File End Depth = 8860.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
468470 datums
Tape Subfile: 4 791 records...
~nimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 15266.0
EWR4 15235.0
CNP 15251.0
SLD 15260.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
15885.0
15858.0
15865.0
15874.0
22-JUN-95
ISC 2.02
3.93
MEMORY
15910.0
15343.0
15910.0
0
31.4
41.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD LITHO-DENSITY
DGR DUAL GAMMA RAY
$
TOOL NUMBER
P0363CRNSLDG6
P0363CRNSLDG6
P0363CRNSLDG6
P0363CRNSLDG6
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
8.500
9048.0
BOREHOLE CONDITIONS MI/D TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND-LT
10.20
45.0
10.0
600
4.4
1.600
.800
1.700
1.600
78.0
163.0
75.0
70.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
SANDSTONE
2.65
HOLE CORRECTION (~ :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS: MWD RUN 5.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPL-16
: MILNE POINT
: NORTH SLOPE
: ALASKA
.0
30
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
13 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 RPX MWD 68 1 OHMM 4
3 RPS MWD 68 1 OHMM 4
4 RPM MWD 68 1 OHMM 4
5 RPD MWD 68 1 OHMM 4
6 RHOB MWD 68 1 G/C3 4
7 DRHO MWD 68 1 G/C3 4
8 PEF MWD 68 1 BN/E 4
9 NPHI MWD 68 1 PU-S 4
10 FCNT MWD 68 1 CPS 4
11 NCNT MWD 68 1 CPS 4
12 FET MWD 68 1 HR 4
13 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 350 01 1
4 90 356 99 1
4 90 358 01 1
4 90 890 01 1
4 90 334 31 1
4 90 334 30 1
4 90 180 01 1
4 90 810 01 1
52
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 81
Tape File Start Depth = 15940.000000
Tape File End Depth = 15220.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
74584 datums
Tape Subfile: 5 150 records...
~nimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 6 is type: LIS
96/ 9/26
01
**** REEL TRAILER ****
96/ 9/26
01
Tape Subfile: 6 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Thu 26 SEP 96 2:38p
Elapsed execution time = 8.07 seconds.
SYSTEM RETURN CODE = 0
MPL- 16 "q ~~'
MILNE POINT
~RECEIVED
dUL 2 1 1995
;ka Oil & Gas 6~s.
/-%, _.pF%,
/% ..,% /k
Run 1'
02 - July - 1995
GRCH
Marked Line
144OO
15591
Date ? ATLAS
Logging Services
Tape Subfile 2 ~s ty~e: baS
TAPE HEADER
MILNE POINT UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MPL - 16
500292256600
BP EXPLORATION (ALASKA) INC.
WESTERN ATLAS LOGGING SERVICES
il-JUL-95
6453.00
J. DAHL
D. ROBERTSON
8
13N
10E
3604
5148
51.72
50.22
16.60
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING
2ND STRING
3RD STRING 9.625 9048.0
PRODUCTION STRING 7.000 15867.0
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
$
SBT
GR
1
1
02-JUL-95
WESTERN ATLAS LOGGING SERVICES
EQUIVALENT UNSHIFTED DEPTH
REMARKS:
Marked Line GR/SBT.
40.00
26.00
*** THIS IS THE DEPTH REFERENCE FOR THIS WELL ***
PASS 1 (MAIN PASS) WAS NOT DEPTH SHIFTED SINCE THE
MAIN PASS IS THE DEPTH REFERENCE FOR THIS WELL.
LOG WAS RUN WITH MARKED LINE FOR PRIMARY DEPTH CONTROL.
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 14400.0 15591.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH
$
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
PASS 1 (MAIN PASS).
THE GAMMA RAY FROM THIS PASS IS THE DEPTH REFERENCE FOR
THIS WELL.
CN : BP EXPLORATION
WN : MPL-16
FN : MILNE POINT
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRCH GR 68 1 GAPI 4
2 TENS GR 68 1 LB 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 30 310 01 1
4 30 635 99 1
* DATA RECORD (TYPE# 0) 1014 BYTES
Total Data Records: 30
Tape File Start Depth = 15650.000000
Tape File End Depth = 14394.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7540 datums
Tape Subfile: 2 120 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate
PASS NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH GRCH
15424.5 15424.5
15432.5 15433.0
15438.5 15438.5
15470.0 15470.5
15481.0 15482.0
15502.5 15503.0
15507.0 15507.5
15512.5 15513.0
15514.5 15514.5
15529.0 15530.0
15539.0 15539.0
15541.5 15542.0
15544.5 15544.5
15547.0 15547.5
15551.0 15552.0
15554.0 15554.0
15559.5 15560.0
15566.0 15566.5
$
START DEPTH
15390.0
STOP DEPTH
15591.0
(MEASURED DEPTH)
REMARKS:
EQUIVALENT UNSHIFTED DEPTH --
PASS 2 (REPEAT PASS).
TENS WAS SHIFTED WITH GRCH.
files.
/ ? ?MATCH1. OUT
$
CN : BP EXPLORATION
WN : MPL-16
FN : MILNE POINT
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH GR 68 1 GAPI 4
2 TENS GR 68 1 LB 4
4 30 995 99 1
4 30 995 99 1
* DATA RECORD (TYPE# 0) 1014 BYTES
Total Data Records:
Tape File Start Depth = 15675.000000
Tape File End Depth = 15403.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
1636 datums
Tape Subfile: 3
57 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: .2500
FILE S~RY
VENDOR TOOL CODE START DEPTH
GR 14400.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
15604.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CCL
GR
ACC
CENT
SBT
CENT
VDL
CENT
$
CASING COLLAR LOC.
GAMMA RAY
ACOUSTILOG COMMON
CENTROLLER WTS
SEGMENTED BOND TOOL
CENTROLLER WTS
VDL SUB
CENTROLLER WTS
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT) :
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
02-JUL-95
FSYS REV. J001 VER. 1.1
1645 02-JUL-95
15779.0
15636.0
14400.0
15628.0
1500.0
YES
TOOL NUMBER
2330XA
1309XA
1633XA
1424XA
1424PA
.000
15867.0
.0
BRINE/DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
.00
HOLE CORRECTION (IN):
.~30
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 0
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 0
TOOL STANDOFF (IN):
.0
REMARKS:
PASS 1 (MAIN PASS).
$
CN : BP EXPLORATION
WN : MPL-16
FN : MILNE POINT
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR GR 68
2 CCL GR 68
3 SPD GR 68
4 TEN GR 68
5 TTEN GR 68
1 GAPI 4
1 4
1 F/MN 4
1 LB 4
1 LB 4
4 30 310 01 1
4 30 150 01 1
4 30 636 99 1
4 30 635 99 1
4 30 635 99 1
20
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 120
Tape File Start Depth = 15650.000000
Tape File End Depth = 14394.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
37691 datums
Tape Subfile: 4 198 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 15388.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
15630.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CCL
GR
ACC
CENT
SBT
CENT
VDL
CENT
$
CASING COLLAR LOC.
GAFfMA RAY
ACOUSTILOG COMMON
CENTROLLER WTS
SEGMENTED BOND TOOL
CENTROLLER WTS
VDL SUB
CENTROLLER WTS
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT) :
LOGGER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G) :
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
02-JUL-95
FSYS REV. J001 VER. 1.1
1548 02-JUL-95
15779.0
15636.0
14400.0
15628.0
1500.0
YES
TOOL NUMBER
2330XA
1309XA
1633XA
1424XA
1424PA
.000
15867.0
.0
BRINE/DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
.00
HOLE CORRECTION (IN;:
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 0
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 0
TOOL STANDOFF (IN) :
.0
REMARKS:
PASS 2 (REPEAT PASS).
$
CN : BP EXPLORATION
WN : MPL-16
FN : MILNE POINT
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR GR 68
2 CCL GR 68
3 SPD GR 68
4 TEN GR 68
5 TTEN GR 68
1 GAPI 4
1 4
1 F/MN 4
1 LB 4
1 LB 4
4 30 310 01 1
4 30 150 01 1
4 30 636 99 1
4 30 635 99 1
4 30 635 99 1
2O
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 26
Tape File Start Depth = 15675.000000
Tape File End Depth = 15403.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
8171 datums
Tape Subfile: 5 104 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 6 is type: LIS
95/ 7/11
01
**** REEL TRAILER ****
95/ 7/12
01
Tape Subfile: 6 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Wed 12 JLY 95 8:16a
Elapsed execution time = 4.34 seconds.
SYSTEM RETURN CODE = 0