Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-076Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages' Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Bevedy Diann~than Lowell ~si [] TO RE-SCAN Notes: Re-Scanned by: Beverly Dianna Vincent Nathan Lowell Date: Is/ _ STATE OF ALASKA . ALAS~ILAND GAS CONSERVATION COM_SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Alaska Oil & Gas Cons. Commission RECEIVED MAR 0 1 2006 . . 1 a. Well Status: D Oil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class: 20AAC 25.105 20AAC 25.110 181 Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 1/1/2006 195-076 305-391 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 06/30/1995 50- 029-21613-01-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 07/22/1995 PBU G-30A 2519' FNL, 2369' FEL, SEC. 12, T11N, R13E, UM 8. KB Elevation (ft): 15. Field / Pool(s): Top of Productive Horizon: 2520' FNL, 592' FEL, SEC. 12, T11N, R13E, UM 69.78' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+ TVD) Pool 2564' FNL, 1809' FWL, SEC. 07, T11N, R14E, UM 9447 + 8890 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 657857 y- 5969122 Zone- ASP4 11800 + 8965 Ft ADL 028304 ------------ ~----- 11. Depth where SSSV set 17. Land Use Permit: TPI: x- 659633 y- 5969158 Zone- ASP4 --- N/A MD Total Depth: x- 662034 y- 5969166 Zone- ASP4 ____n_n________ _n____ ,___ _~____M --- - _un _ __nn______ 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey DYes 181 No N/ A MSL 1900' (Approx.) 21. Logs Run: MWD, LWD, RLL, GR, CN, CDL, RB, DLL, TEMP 22. CASING, LINER AND CEMENTING RECORD CASING 5ETTING EPTH MO 5ETTING I EPTH TVO ~?z1f AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 30" 9 cu vds Concrete 13-3/8" 72# L-80 Surface 2684' Surface 2684' 17-1/2" 3250 cu ft PF 'E'. 460 cu ft PF 9-5/8" 47# L-80 Surface 6590' Surface 6230' 12-1/4" 575 cu ft Class 'G' 7" 29# L-80 6456' 9823' 6115' 9021' 8-1/2" ~75 cu ft Class 'G', 176 cu ft Class 'G' 4-1/2" 12.6# L-80 9678' 11800' 8986' 8965' 6" 1286 cu ft Class 'G' 23. Perforations op'en to Production (MD + TVD of Top and 24. TUBING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None 3-1/2",9.2#, L-80 9456' 6430' & 9398' MD TVD MD TVD 25. ACID, FRACTURE, CEMENT SaUEEZE, ETC. . ¡ ..',he·.':'· DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED :0ìÜ "ii', 9998' P&A w/ 27.5 Bbls Class 'G' 9447' bnd Plua: 23 Bbls Class 'G' 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test Hours Tested PRODUCTION FOR Oil -BSl GAs-McF W ATER-Bsl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED + Oll-Bsl GAs-McF WATER-BSl Oil GRAVITY-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS BFL MAR 0 :i 2D06 Form 10-407 Revised 12/20030 RIG I N ArlNUED ON REVERSE SIDE b 28. GEOLOGIC MARKER 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 8855' 8448' None Shublik 8877' 8467' Sadlerochit 8940' 8523' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble Title Technical Assistant Date ad-(:l.Ø~ PBU G-30A Well Number 195-076 305-391 Permit No. / A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By NameINumber: Drilling Engineer: Terrie Hubble, 564-4628 Ted Stagg, 564-4694 ITEM 18: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection. Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool Is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only e e Well: Field: API: Permit: G-30B Prudhoe Bay Unit 50-029-21613-02-00 205-208 Accept: Spud: Release: Rig: 01/07/06 01/10/06 01/19/06 Nordic #1 PRE-RIG WORK 01/01/06 MIRU. MU/RIH WI MEM GRICCL. KILL WELL WI 110 BBLS KCL, WELL ON VACUUM. HARD TAG DOWN AT 9889'. LOG FROM TAG TO 9250', PAINT FLAG. POOH. MUIRIH WI 2" BDJSN. LIQUID PACK WELL, TOP WI DIESEL FOR "+" WHP. TAG DOWN AT 10038'. PUMP 27.5 BBLS 17 PPG CLASS "G" CEMENT. GET 200 PSI BUMP IN WHP, LAY IN REMAINING CEMENT. PULL TO SAFETY. WAIT ON CEMENT. 01/02106 HESITATE ON PLUG TO 400 PSI. LEAK OFF DECREASING. CEMENT TOP PUMPED DOWN TO CALCULATED 9598'. DROP BALL, CONTAMINATE TO TAG AT 9998'. MAKE REPEAT JETTING PASS TO 8500' AND BACK TO 9996'. JET OUT, MAKING REPEAT PASSES AT JEWELRY. RECOVER BALL. TEST INJECTIVITY. STANDBY FOR RELOAD OF FLUIDS/CEMENT. RU CEMENTERS, RIH, UNABLE TO GET THRU LINER. POH, CHANGE BHA, RIH. PASS LINER TOP - OK. TIE-IN TO FLAG AT 10004'. CIRC WI KCL AND DIESEL TO SURFACE FROM 9997'. MIX! AND BEGIN PUMPING 23 BBLS 17# CLASS G CEMENT. 01/03/06 PUMPI LAY IN 23 BBL OF 17# CLASS G CEMENT FROM 9990'. PULL TO SAFETY. BUMP AND HESITATE ON PLUG. TEST TO 700 PSI. GOOD. CONTAMINATE I CLEANOUT TO TARGET DEPTH OF 9437'. CHASE OUT, MAKING REPEAT PASSES ACROSS ALL JEWELRY AND GLM'S. FP WELL FROM 2500' WI WATER/METH. TRAP 200 PSI ON WELLHEAD. RDMO. NOTIFY PCC I PO OF WELL STATUS. JOB COMPLETE. , /" - Paget .. BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-30 G-30 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Date From- To Hours Task Code NPT Phase 1/7/2006 00:00 - 03:30 3.50 BOPSUF P PRE 03:30 - 11 :00 7.50 BOPSUF N SFAL PRE 11:00 - 14:00 3.00 BOPSUF P PRE 14:00 - 16:00 2.00 BOPSUF N SFAL PRE 16:00 - 19:00 3.00 BOPSUF P PRE 19:00 - 21 :00 2.00 RIGU P PRE 21 :00 - 00:00 3.00 RIGU P PRE 1/8/2006 00:00 - 02:00 2.00 STWHIP P WEXIT 02:00 - 04:15 2.25 STWHIP P WEXIT 04:15 - 08:30 4.25 STWHIP P WEXIT 08:30 - 09:00 0.50 STWHIP P WEXIT 09:00 - 14:20 5.33 STWHIP P WEXIT 14:20 - 14:36 0.27 STWHIP P WEXIT 14:36 - 15:20 0.73 STWHIP Þ WEXIT 15:20 - 16:45 1.42 STWHIP P WEXIT 16:45 - 17:30 0.75 STWHIP P WEXIT 17:30 - 19:30 2.00 STWHIP P WEXIT 19:30 - 20:00 0,50 STWHIP P WEXIT 20:00 - 20:20 0.33 STWHIP P WEXIT 20:20 - 21 :00 0.67 STWHIP P WEXIT 21:00 - 21 :30 0.50 STWHIP P WEXIT 21 :30 - 21 :50 0.33 STWHIP P WEXIT 21 :50 - 22:00 0.17 STWHIP P WEXIT 22:00 - 00:00 2.00 STWHIP P WEXIT 1/9/2006 2.50 STWHIP P WEXIT 00:00 - 02:30 Start: 1/6/2006 Rig Release: 1/20/2006 Rig Number: N1 Spud Date: 7/23/1986 End: 1/19/2006 Description of Operations ACCEPT RIG AT 0000 HRS, 01/07/06. NU BOPE. Spot tanks and trailers. RIU hardline to frac tank. Grease tree. Trouble shoot swap and master. Grease test regrease cycle valve etc. Pressure 1 Function test BOPE. AOGCC Test Witness waived by Chuck Scheeve Continue with general rig up. Complete Reel swap install hard line in reel. Repair Annular Preventer. It failed to test, replaced inner seals. Changed out BOPE fluid. Continue testing BOP. Send BOP test report to AOGCC. Pull 2' coil to injecter head. Stab pipe. Weld on CTC using rig welder. Pull 1 pressure test CTC. Fill coil with Biozan KCL water. Press test inner reel valve. Circ. Dart. Dart on seat at 40.3 bbls. Open well. Well was dead. M/U BHA #1, 2.74" Pilot hole mill, 1.75 deg motor and Sperry MWD with BOT MHA. OAL = 62.51'. RIH with pilot hole MWD BHA. SHT at 3000'. Orienter OK. MWD OK, RIH to 9200'. Log GR tie-in inside 3-1/2" tubing. Correct +45'. Resolve tie-in issues and verify tie-in log is depth corrected. RIH . Orient to high side. Tag cement at 9452' Drill pilot hole in cement plug. Drilling to high side at 1.74 bpm @ 3400 psi, FS= 3200 psi, PU Wt 30K. ROP 16. Drill to 9513 beginning of ramp. PU above 9450 to orient to low side. Drill cement ramp 1.64 bpm at 3360 psi. from 9513 to 9519.5. Motor work increase and Tool face change. Ramp in contact with low side of 7" casing. PU 15' and retag. POH for window mill. POH to surface. BHA swap pilot milling assy for window milling assy. RIH with window milling BHA #2 with 2.5 deg motor. RIH to 9400'. Orient TF to 130R. RIH to bottom. Tag 3 times at 9517', no depth correction. Pick up to tie-in and confirm depth. Log GR tie-in at 8942'. Added 5.5 ft to CTD. RIH. Tag TD at 9522'. Pick up to 9510'. RIH to 9518' and start pump. Ease down to 9520.5'. Park and had 145L TF. Pick up to 9450' and orient TF to 140R. RIH to 9518', start pump and RIH to 9520.5'. TF = 170R. Pick up 1 ft to reduce down force. Mill 2.74" window as per procedure. 1.6 bpm, 0 WOB, 3150 psi, 175R. Procedure takes 3 hours to mill first foot. Flagged coil at 9519.5 ft. Milling 2.74" window, 1.65 bpm, 2500 psi, 0 wob, 175R, Milled to 9521'. Printed: 1/2312006 1 :06:20 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: /' ~ Page 2_ BP EXPLORATION Operations Summary Report G-30 G-30 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 1/9/2006 02:30 - 04:45 From -To Hours Task Code NPT Phase WEXIT Date 04:45 - 12:30 12:30 - 14:00 14:00 - 16:30 16:30 - 18:30 18:30 - 19:00 19:00 - 22:30 22:30 - 00:00 1/10/2006 00:00 - 01 :00 01 :00 - 03:00 03:00 - 03:15 03:15 - 03:50 03:50 - 05:50 05:50 - 06:10 06:10 - 06:15 2.25 STWHIP P 7.75 STWHIP P 1.50 STWHIP P 2.50 STWHIP P 2.00 STWHIP P 0.50 STWHIP P 3.50 STWHIP P 1.50 STWHIP P 1.00 STWHIP P 2.00 STWHIP P 0.25 STWHIP P 0.58 DRILL P 2.00 DRILL P 0.33 DRILL P 0.08 DRILL P 12:30 - 12:45 12:45 - 14;45 14:45 - 15:15 15:15 - 15:30 15:30 - 16:45 16:45 - 17:15 17:15 -17:45 17:45 - 19:15 19:15 - 20:00 P P 0.25 DRILL P 2.00 DRILL P 0.50 DRILL P 0.25 DRILL P 1.25 DRILL P 0.50 DRILL P 0.50 DRILL N WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 RREP PROD1 Start: Rig Release: Rig Number: 1/6/2006 1/20/2006 N1 Spud Date: 7/23/1986 End: 1/19/2006 Description of Operations Milling 2.74" window, 1.65 bpm, 2000 psi, 2500 wob, 175R, Milled to 9523'. Starting to stack weight. Milling 2.74" window, 1,6 bpm, 2200 psi, 3500 wob, 175R, Stacking weight. Pick up 10ft. 6K overpull. Up wt = 36K, RIH, Dwn wt = 17K. Drill to 9526 unable to drill. No motor work . Decide to POH. POH Snag GLM at 6390. Continue to POH to surface. BHA swap Mill NoGo 2.72' gauge ring. Center of mill worn. Make up HC 331 pabarolic pilot mill , string mill, 1.75 motor & new MWD probe (limiting out battery hours) RIH. Log GR tie-in. Added 7' to CTD. RIH with 170L TF. Ream window starting at 9521'. Several stalls. Orient around to 175R. Several stalls getting to 9524'. Ream window area down to 9526'. Mill new formation, 1.65 bpm, 2500 psi, 175R TF, 12 fph, full returns. Milled to 9535'. Ream window up and down 3 times. Swap well to FloPro while reaming. RIH clean thru window with no pump. Back ream up thru window clean. POH to surface while circ at 1.6 bpm. Flag coil at 9200' EOP. Layout milling BHA. Mill still at full gauge [2.74" no go]. String reamer at 2.73" no go. MIU BHA #4 with 2.8 deg BHI X-treme Motor and re-built HCC 2.7 X 3.0' bicenter bit #4. OAL = 59.92'. RIH with build BHA. SHT tools at 3000'. OK. RIH to flag. Added 6' CTD to correct to flag. Orient TF to 150R. RIH thru window. Tag bottom at 9533'. Add 2 ft to CTD to correct depth to 9535'. Orient TF from 1 05L to 135R. Directionally drill 1.67/1.68 bpm @ 3350 psi, FS 3000 psi. TF 135R 23K Up, 19K Dn ,CT Wt 13K. Orient TF to 80R. Drilling turn I build section, 75R, 40 fph, Drilled to 9680'. Drilling tum I build section, 80R, 40 fph, Drilled to 9700' Wiper trip to wi Drilling tu uild section, 1.7/1.7 bpm, 3050/3200 psi, 80R, 80 rilled to 9790'. rilling tum section, 1.7/1.7 bpm, 3050/3200 psi, BOR, 100 fph, Landed at 90 deg incl, at 8965 ft TVDSS at 9790' MD. Drilled to 9818'. Drilling turn section, 1.7/1.7 bpm, 3050/3200 psi, BOR, 100 fph, Drilled to 9851 ft. POH for Lateral BHA. OOH. SIB injector. Check motor & orienter - OK. Check bit- OK (1/111). UD MWD guts. Observe hydraulic oil leakage from annular BOP cap. Suspect annular cap seals must have warmed-up & softened enough to allow leak. Inspect cap & retighten. Pressure annular to Printed: 1/2312006 1 :06:20 PM ~lJL%lJŒ ··mn. 1 ¡:- ¡~\., n ! ~ì rr 'i 0 i¡ ~ : :::;¡ ï ¡ i. ail' I. '.' ./ W \. rI \.YJU uulb I~ , HÏ\ ¡LA LFû e / " / FRANK H. MURKOWSKI, GOVERNOR I j , ¡ / I ¡ 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 AIfASKA. OIL AlVD GAS CONSERVATION COMMISSION Ted Stagg CT Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: PBU G-30A Sundry Number: 305-391 \~J/ùlh ð)(;NJ5~~fÞ'r , "\oV...~ ( (., \:-~ eLf Dear Mr. Stagg: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, n Chai DATED this-z,;1'day of December, 2005 Encl. If:kíA- i 2( 2 7/2Ø"''' . STATE OF ALASKA PI!;. e-/«[) RF' E:IVED ALASKA olL AND GAS CONSERVATION COMMISSION DEi .(~¡ . APPLICATION FOR SUNDRY APPROV~~k O. '/. 2005 20 AAC 25.280 $ a " & An (/} 124 2J~S 1. Type of Request: ,"¡,¡mmiJsio" 181 Abandon o Alter Casing o Change Approved Program o Suspend o Repair Well o Pull Tubing o Operation Shutdown 0 Perforate 0 Other o Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well o Perforate New Pool 0 Waiver 0 Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Cla~ 181 Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number 195-076 / 6. API Number: / 50- 029-21613-01-00 99519-6612 69.78' 9. Well Name and Number: PBU G-30A /' ADL 028304 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): 10025 9025 TVD Plugs (measured): 10025 Burst Junk (measured): None Colla se 8. Property Designation: 11. Total Depth MD (ft): Total Depth TVD (ft): 11800 8965 Len th Size 110' 20" 110' 110' 2684' 13-3/8" 2684' 2684' 4930 2670 6590' 9-5/8" 6590' 6230' 6870 4760 3367' 7" 6456' - 9823' 6115' - 9021' 8160 7020 Liner 2132' 4-1/2" 9678' - 11800' 8986' - 8965' 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): 9622' - 9950' (Above IBP) 8971' - 9026' Packers and SSSV Type: 7" x 3-1/2" Baker 'SABL-3' packer; 'SAB' packer Tubing Size: 3-1/2",9.2# 9-5/8" x 3-1/2" Baker Tubing Grade: Tubing MD (ft): L -80 9456' Packers and SSSV MD (ft): 9398'; 6430' / 12. Attachments: 181 Description Summary of Proposal o Detailed Operations Program 14. Estimated Date for Commencing Operations: o BOP Sketch 13. Well Class after proposed work: / o Exploratory 181 Development 0 Service 16. Verbal Approval: Commission Re resentative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Ted Stagg Title CT Drilling Engineer January 1 , 2006 Date: 15. Well Status after proposed work: o Oil 0 Gas o WAG 0 GINJ o Plugged DWINJ /' 181 Abandoned o WDSPL Contact Ted Stagg, 564-4694 Phone 564-4694 Commission Use Onl Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness o Plug Integrity o BOP Test o Mechanical Integrity Test o Location Clearance Other: RBDMS BFt .IAN (I 3 7006 (0 - 407 ' COMMISSIONER APPROVED BY THE COMMISSION Date IZ-"'z,r,.£ Submit In Duplicate L e e Re: ~~ )f :;;; ... ~~ Sundry approval is requested to prepare G-30A for a sidetrack. G-30A is a Zone 1/2 sidetrack that reaChe;} marginal GOR in 2004 and has cycled since then. During the past 12 months the on-time has been less that 20%. With no wellwork options, a sidetrack to a new area is planned. The sidetrack, G-30B, is scheduled to be drilled by Nordic 1 on or about Jan. 7. 2006. The plan calls for laying 17 ppg cement across the entire production liner to prep for a cement ramp exit in Zone 2 with the target in Zone lB. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission To: From: Ted Stagg CTD Engineer Date: December 21, 2005 Prep Prudhoe G-30A for CTD sidetrack Pre-IDe Work 1) Integrity testing of the IA and OA has been successfully completed. 2) Tubing has been inspect~d . a PDS calliper and is in good condition. 3) 17 ppg cement (minimu 14 bls) will be layed across the 4 Y2" production liner to shut-off all perforations and provide a cement ramp exit. 4) Remove flow line, remove well house, and level pad. The pre CTD work is slated to begin about Jan. 1. 2006. -r~<; 10 -40?> ~f~M. IDe Work 1) MIRU Nordic 1 and test BOPE. 2) Mill 2.74" window in Shublik interval. 3) Drill sidetrack into Zone 1B target. 4) Run solid 23/8" liner and cement. 5) Cleanout liner and perforate for production (-1000 ft of perfs). 6) Freeze protect well and RDMO. Post-IDe Work 1) Install well house, flow line and gas lift valves. ~~ Ted Stagg <; CTD Drilling Engineer 564-4694 CC: Well File Sondra Stewmanfferrie Hubble TREE: 3" -5M-FMC WB...LHEAO: 13-518" -5M McEVOY SSH ÃC1UA TOR: KB. B...EV : BF. B...EV : KOP= Max Angle = Datum M) = Datum 1VD = AXB...SON 69.78' 39.3' 3098' 97 @ 10858' 9410' 8800'SS e G-30A ~ NOTE: 9-5/8" LNR HGR HAS KNOWN ~ AND THE REASON FOR THE STRADDLE COMPLETION. HORIZONTAL WELL -700@ 9654' AND 900 @ 9923' . 2201' -i 3-112" SSSV OTIS LANDING NIP, 10: 2.750 9-518" CSG, 47#, L-80, ID: 8.681" I I TOP OF 9-518" CSG 1V0 4120 5989 GAS LIFT MANORB...S DEV TYÆ VLV LATCH PORT DATE 26 McMURRY OMY RK 0 0811310 32 McMURRY OMY RK 0 08/13/0 13-318" CSG, 72#, L-80, 10= 12.347" I 6418' 6430' 3-112" HES X NIP, ID = 2.750" I 9-5/8" X 3-112" BAKER SAB PKR. 10 = 3.25" I TOP OF 7" LNR I 6456' I SIDETRACK WINDOW 6600 - 6645' Minimum ID = 2.205" @ 11405' 2-7/8" HES XN NIPPLE 9-5/8" CSG, 47#, L-80, 10: 8.681" I 9678' -I 7" X 5" TIN PKR, 10: 7?7? I 7" LNR, 29#, L-80, .0371 bpf, 10=6.184" ÆRFORA TION SUMMARY REF LOG: MvVO/GR ON 06130195 ANGLE AT TOP ÆRF: 70 @ 9622' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPNfSQZ DATE 2-1/4" 6 9622 - 9642 0 01/15102 2-114" 6 9750 - 9770 0 OS/23101 2-1/4" 6 9780 - 9820 0 OS/23101 2-314" 4 9830 - 9950 0 07124195 2-314" 4 10100 - 10300 0 07/24/95 2-314" 4 10350 - 10390 0 07124/95 2-3/4" 4 10760 - 10810 0 07/24/95 2-314" 4 10890 - 11100 0 07/24195 2-3/4" 4 11440-11700 S 06127196 2-1/2" IBP (05123101) I 4-112" X 2-718" BAKER MOOB... 0 PKR, 10: 2.688' -i2-718" HES X NIP, 10: 2.20' 2-318" TBG, 4.6#, L-80, .0087 bpf, 10 = 1.995" -i 2-718" TTWLEG I H B...MO TT NOT LOGGEI: DATE 08/07/86 07/30/95 01130/02 09/02/02 06104103 08/13/03 REV BY COMMENTS ORIGINAL COM PLETION SIDETRACK (G-30A) RNITP CORRECTIONS SVcnP KBECORRECTION A TDlTLP GL V CORRECTIONS JCMlTLH GL V CJO OA TE REV BY COMMENTS 09/28/05 OA V ITLH IBP CORRECTION 10104105 OA V ITLH PKR CORRRECTlON PRUDHOE BA Y UNIT WB...L: G-30A PERMIT No: '1950760 API No: 50-029-21613-01 SEe 12, T11 N, R13E. 2519' FNL & 2369' FB... BP Exploration (Alaska) TREE :: 3" -5M -FMC WELLHEAD:: 13-5/8" -5M McEVOY SSH ACTUATOR = AXB.SON KB. B.EV:: 69.78' BF. B.EV :: 39.3' KOP:: 3098' Max Angle = 97 @ 10858' Datum MD = 9410' Datum TVD - 8800' 55 e G-30B .. JTE: 9-5/8" LNR HGR HAS KNOWN Lð AND THE REASON FOR THE STRADDLE COMPLETION. HORIZONTAL WELL - 70° @ 9654' AND 90° @ 9923' Proposed CTD Sidetrack . 2201' -1 3-1/2" SSSV OTIS LANDING NIP, 11):: 2.750· I TOP OF 7" LNR I TVD 4120 5989 GAS LFT MANDRB.S DEV TYÆ VLV LATCH PO 26 McMURRY [)MY RK 0 32 McMURRY [)MY RK 0 DATE: 08/13/03 ; 08/13/03 ' 13-3/8" CSG, 72#, L-80, Ð = 12.347" 9-5/8" CSG, 47#, L-80, Ð = 8.681" I TOP OF 9-5/8" CSG I 6418' 6430' 3-1/2" HES X NIP, ID = 2.750" I 9-5/8" X 3-1/2" BAKER SAB PKR. ID = 3.25" 9-5/8" CSG, 47#, L-80, ID:: 8.681" I SIDETRACK WNX>W 6600 - 6645' 3-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" I 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" PERFORA TION SUMfAARY REF LOG: MVVDlGR ON 06/30/95 ANGLE AT TOP PERF: 70 @ 9622' Note: Refer to A'oduction DB for historical perf data SIZE SPF NTERVAL OPNIsaz DATE 2-1/4" 6 9622 - 9642 0 01/15/02 2-1/4" 6 9750 - 9770 0 OS/23/01 2-1/4" 6 9780 - 9820 0 05123/01 2-314" 4 9830 - 9950 0 07/24/95 2-3/4" 4 10100 - 10300 0 07/24/95 2-314" 4 10350 - 10390 0 07/24/95 . 2-3/4" 4 10760 - 10810 0 07/24/95 2-3/4" 4 10890-11100 0 07/24/95 2-314" 4 11440 - 11700 5 06/27/96 11900' 2-1/2" BP(05/23/01) 4-1/2" X 2-7/8" BAKER MOœ.. D PKR. Ð:: 2.688" 2-7/8" HES X NIP, 11):: 2.205" 2-7/8" TTWLEG B.M:> TT NOT LOGGED I PBTDI 4-1/2" LNR, 12.6#, L-80, .0152 bpf, Ð:: 3.958" I 2-3/8" TBG, 4.6#, L-80, .0087 bpf, Ð = 1.995" DATE 08107/86 07130195 01130102 09102102 06104103 08113103 REV BY COfo/M3IITS ORIGINAL COM PLETION SIDETRACK G-30A RN'TP CORRECTIONS SVCIlP KBE CORRECTION A TD/TLP GL V CORRECTIONS JCM'TlH GL V C/O DATE REV BY COtvM:NTS 09/28/05 DA V1TlH BP CORRECTION 10/04105 OA V ffi.H PKR CORRRECTION PRUDHOE BAY UNIT WB.L: G-30A PERMIT No: "1950760 API No: 50-029-21613-01 see 12, T11N, R13E, 2519' FNL & 2369' Fa. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate _X Add Ferfs Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 2519' FNL, 2369' FEL, Sec. 12, T11N, R13E, UM At top of productive interval 2520' FNL, 591' FEL, Sec. 12, T11N, R13E, UM At effective depth 2885' FNL, 3553' FEL, Sec. 7, T11 N, R14E, UM At total depth 2564' FNL, 3107' FEL, Sec. 07, T11N, R14E, UM 12. Present well condition summary 5. Type of Well: Development __X Explorato~__ Stratigraphic__ Service__ (asp's 657856, 5969122) (asp's 659633, 5969158) (asp's 661596, 5968835) (asp's 662034, 5969165) 6. Datum elevation (DF or KB feet) RKB 71 feet 7. Unit or Properly name Prudhoe Bay Unit 8. Well number G-30A 9. Permit number / approval number 195-076 10. APl number 50-029-20221-01 11. Field / Pool Prudhoe Bay Oil Pool Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2651' Production 6557' Liner 3367' Sidetrack Liner 2132' 11800 feet Plugs (measured) 8965 feet 11716 feet Junk (measured) 8964 feet IBP set @ 11250' (06/27/96) IBP set @ 11344' (04/26/96) Size Cemented Measured Depth True Vertical Depth 20" 72 c.f. concrete 143' 143' 13-3/8" 3250 c.f. PF 'E', 460 c.f. 2684' 2684' PF 9-5/8" 575 c.f. Class 'G' 6590' 5975' 7" 415 sx 'G', 154 sx 'G' 6456' - 9823' 6116' - 9022' 4-1/2" 250 sx Class 'G' 9668' - 11800' 8988' - 8966' Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) Open Perfs 9622' - 9642', 9830' - 9950', 10100' - 10300', 10350' - 10390', 10760' - 10810', 10890'- 11100', Open Perfs below IBP 11440'- 11700' Open Perfs 8972 - 8979, 9020 - 9026, 9026 - 9025, 9024 - 9024, 9018 - 9012, 9003 - 8986, Open Perfs below IBP 8966'- 8964' 3-1/2", 9.2#, L-80 TBG @ 6430'. 3-1/2", 9.2# Tubing Tail @ 9447'. 9-5/8" x 3-1/2" Baker SAB Packer @ 6430'. 7" x 3-1/2" Baker SABL-3 Packer @ 9398'. 4-1/2" x 2-7/8" Baker Model D Packer @ 11370'. 3-1/2" Otis SSSV Landing Nipple @ 2201'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 01/11/2002 Subsequent to operation 01/17/2002 OiI-Bbl 532 Representative Daily Averaqe Production or Injection Data Gas-Mcf Water-Bbl 14231 12 2029 9770 31 Casing Pressure Tubing Pressure 700 1474 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil__X Gas__ Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~ ,~/~~~~ Title: Techical Assistant DeWayne R. Schnorr Date January 25, 2002 Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE G-30A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 11/29/2001 01/12/2oo2 01/13/2OO2 PERF(ADD-PERF): DRIFT & TAG W/2.50" D-GUN PERF(ADD-PERF): PERFORATE 9622-9642 FT PERF(ADD-PERF): FISH E-LINE TOOLS EVENT SUMMARY 11/29/01 DRIFT W/2.50" X 10' DUMMY GUN TO 9737' SLM, NO ROLLERS, STOPED DUE TO DEVIATION (HAW) ( GAVE PAD OPPERATOR WELL BACK SAID WOULD OPEN HIMSELF ) ***UPCOMING PERFORATION DEPTH AT 9642'*** 01/1 2/02 PERFORATED 9622-9642 FT MD WITH 2.25" HSD @ 6 SPF WITH 2306 POWERJET CHARGES. WHP AT RIH = 750 PSI. SI TO RIH. IN 1.5 HOURS, WHP CLIMBED TO 1900 PSI. BLED OFF TO 1000 PSI FOR PERFORATING. AFTER PERF, WHP CLIMBED FOR A LITTLE WHILE TO 2400 PSI. BLED OFF AGAIN, THEN IT CLIMBED AGAIN TO 2200 PSI. THEN, IT DROPPED TO 1200 PSI AND HELD. GOT TOOL STUCK IN NIPPLE NEAR TTAIL - CUT CABLE WITH KINLEY CUTTER - LEFT FISH IN HOLE - GOT ALL CABLE BACK. 01/13/02 RAN 3.5" GR, BAIT SUB AND GRAPPLE TO FISH AT 9386' SLM, LATCHED FISH, BEAT FOR 20 MIN TO GET OUT OF X NIPPLE AT 9424' MD. POH - CAME THROUGH UPPER TWO X-NIPPLES SMOOTHLY. (RECOVERED SCHLUMBERGER TOOLS) RAN 2.7 GAUGE RING W/2.65 SWAGE ABOVE & SET DOWN @ 9395' SLM, OPENED JARS & TOOLS FELL THRU & SAT DOWN @ 9408' SLM, OPENED JARS & TOOLS FELL THRU, CONT' IN HOLE THRU EOT TO 9550. TOOL APPEARED TO HANG UP IN PERFORATED PUP JOINT IN TT ASSEMBLY. WELL TURNED OVER TO PRODUCTION. FLUIDS PUMPED BBLS 0 NO FLUIDS PUMPED 0 TOTAL ADD PERFS 01/1 2/2O02 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2-1/4" PJ 6SPF, 60 DEG PHASING, RANDOM ORIENTATION. 9622'-9642' Page I THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03 2001 PL M ATE T H IS E W IA L UNDER M A R K E R C:LO~M.DOC 85 "-'- 076 6769 95 ..... 076 7007 95---076 BHP 95 ..... 076 CNL/GR 95 --~ 076 DG R / C i',J O 95--' 076 DGR/EWR4 95 .... 0'? 6 DGR/EWRa- 95 .... 0'76 DL.L./GR/SP 95 ..... 076 Re, v,.' Du~R/CNO 95--076 STA'F PRESSURE 95--076 ZDL/CNL/GR/CAL ~9S'ZO'-I 1'728 DL.L..?ZLC, I./CN/GR ~iWD SPEF-,'F~Y~S FH EV/:,..L '7"/~/?- //TJ~ ~W~870 o ---9 '? '70 L 66h5 ..... ~ kid .~--"-8700-.9'770 ~L~9370''-'1 1724 i 'i-- 12 '1,' 1 '1 'i '-1 'i i i 'i--' 'il i 'i I 0 z~ 0 '7 ~>r<' C;OI'4PLETZON DATE p/"j ~/"c{l~/ Ar'e dr"y W a s 1: h e Ar'e we'i t We1 'I ~ s (30 H Iq E N T S Ana'lys'is & descr"i'i::,'t'ion r'-ece'ived? ~. R e c ~.~; '~ v e ,d '? y ,s ~.:~-~ ri F::t I I_i_ I i~] G S~: I:t~JI C ~ S WELL LOG TRANSMITTAL To: State of Alaska February 3, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Larry Grant 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - G-30A AK-MW-50059 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. API#: 50-029-21613-01 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION R PORT AND LOG 1 Status of Well ~' ' .... · Class~flc,a/ho, n ~)f Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] "'~'/////" 2. Name of Operator 7. Permit Number ~.'// BP Exploration 95-76 3. Address 8. APl Number~.l~t~ P. O. Box 196612, Anchora~le, Alaska 99519-6612 ~ ............. '- ....... -* 50-029-~-01 4. Location of well at surface,~'- ' ' J''"~, 9. Unit or Lease Name 2519' SNL, 2369' WEL, SEC. 12, T11N, R13E.. _ :. ~ ........ ~ Prudhoe Bay Unit 2520'SNL, 591' WEL, SEC. 12, T11N, R13 11. Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool 2570' SNL, 1800' EWL, SEC. 7, T11N, R14~ 5. Elevation in feet (indicate KB. DF. etc.) 16. Lease Designation and Serial No. KBE = 70.58 I ADL 028304 12. Date Spudded 13. DateT. D. Reached 14. Date Comp.. Susp. orAband. 115. Water Depth, if offshore 116. No. of Completions I 06/30/95 07/22/95 07/30/95 N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 11800'MD/8965'TVD 11716'MD/8964'TVD YES [] NO []I 2201 feet MD 1900'(Approx.) 22. Type Electric or Other Logs Run MWD, LWD, RLL, GR, CN, CDL, RD, DLL, TEMP 23. CASING, LINER AND CEMENTING RECORD SE-FRNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO'I-I'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor Surface 110' 30" 9 Cu. Yds. Concrete 13-3/8" 72# L-80 Surface 2684' 1 7-1/2" 3250 Cu. Ft. PF 'E', 460 Cu. Ft. Permafrosi 9-5/8" 47# L-80- Surface 6590' 12-1/4" 575 Cu. Ft. Class 'G' 7" 29# L-80 6456' 9823' 8-1/2" 415 sx Class 'G', 154 sx 'G' 4-1/2" 12.6# L-80 9668' 11800' 6" 250 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 3-1/2" 9456' 6430' & 9398' MD TVD 9830'- 9950' 9020' - 9026' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10100' -. 10300' 9026'- 9025' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10350'- 10390' 9024'- 9024' Freeze Protect w/150 bbl Diesel 10760'- 10810' 9018'- 9012' 10890' - 11100' 9003' - 8986' 11440' - 11700' 8966' - 8964' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) August 5, 1995 FIowin~l Date of Test Hours Tested PRODUCTION FOR OlL-BBL GAS-MCF WATER-BBL CHOKESlZE IGAS-OIL RATIO TEST PERIOD ~ I Flow Tubing Casing Pressure CALCULATED OlL-BBL GAS-MCF WATER-BBL ::::)IL GRAVITY-APl (corr) Press. 24-HOUR RATE ~' 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. OfiC 'i 9 i995 Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 8855' 8378' Shublik 8877' 8397' Sadlerochit 8940' 8452' 31. LIST OF A'FFACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~k.,_~ ' Title Senior Drilling S(~pervisor Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". ~'?~":~ ~;~ ~ ~:~'~':' ~'' ~-: ~'i~ Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: G-30A BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 06/26/95 12:01 SPUD: RELEASE: OPERATION: DRLG RIG: DOYON 14 WO/C RIG: DOYON 14 06/26/95 (1) TD: 9815 PB: 8476 06/27/95 (2) TD: 9815 PB: 8476 06/28/95 ( 3) TD: 9815 PB: 8476 NU BOPE MW: 0.0 MIRU DISPLACE DIESEL & CIRC. INSTALL 2-WAY CHK & TEST T/1000#. ND TREE & ADPTR FLANGE. TEST BOPE MW: 0.0 NU BOPE TEST T/250/5000. RU LUB. PULL 2-WAY CHK. MU LNDG JT & PULL HANGER T/FLOOR. CBU. RU HES T/PULL CL. LD 202 JTS & CUT OFF PIECE W/CLEAN CUT OF 4.5" 12.6# L-80 BUTTRESS TBG. W/3 GLM'S & BALL VLAVE. RECOVERED 26 RUBBER CLAMPS & 4 SS BANDS. -- NO CORROSION SHOWING. TEST BOPE T/250/5000. OK. TEST WITNEDSSED BY BOBBY FOSTER W/AOGCC. MILLING WINDOW MW: 0.0 MAKE UP 9-5/8" HES EZSV & RIH SLM TO 6850. CIRC & WORK EZSV 15' & SET SAME AT 6850'. DISPLACE SEAWATER W/10# MILLING FLUID & SPOT 17# PILL TO 6600'. TEST CSG. TO 3500#, OK. POH W/RUNNING TOOL & LAY DOWN SAME. MAKE UP MILLING BHA. RIH W/MILLING ASSEMBLY. MILLING WINDOW IN 9-5/8" CSG. F/6590' TO 6612' WELL : G-30A OPERATION: RIG : DOYON 14 PAGE: 2 06/29/95 (4) TD: 6635' ( 0) 06/30/95 (5) TD: 6617 PB: 0 07/01/95 (6) TD: 7014'( 379) 07/02/95 ( 7) TD: 7512' ( 498) CHANGE 9-5/8" PACKOFF MW: 0.0 VIS: 0 CONTINUE MILLING 9-5/8" SECTION F/6612'-6635'. A 45' WINDOW F/6590' TO 6635'. IRON RECOVERY 90%. CIRCULATE HOLE CLEAN. 10 MIN FLOW CHECK, PUMP DRY JOB, POOH W/SECTION MILL (KNIVES LOOKED GOOD, 1 BLADE SLIGHTLY BENT, ALL ABOUT 20% WEAR W/GOOD HOOK PATTERN) L/D SECTION MILL AND 3 DC'S. M/U 5" MULE SHOE, P/U 31 JOINTS OFF RACK & RIH TO 6635'. UNABLE TO GET INSIDE BOTTOM 9-5/8" STUB, P/U KELLY CIRCULATED AND ROTATE CLEAN OUT STUB F/6635' TO 6698' RIH TO 6740' CIRCULATE & CLEAN HOLE WHILE BJ BATCHED MIXED CEMENT 3~0 SKS (298 CU/FT) CLASS 'G' CEMENT TO 17 PPG. BJ PUMPED 5 BBL'S WATER, TESTED LINES TO 3000 PSI, FOLLOWED BY 15 BBL'S WATER, FOLLOWED BY 53 BBL'S CEMENT SLURRY, FOLLOWED BY 7 BBL'S WATER, DISPLACED W/RIG W/96 BBL'S MUD CIP AT 2250 HOURS 06/28/95. PULL 15 STANDS SLOW. REVERSE CIRCULATE PIPE VOLUME AT 9.5 BPM AT 700 PSI. SQUEEZE AWAY 10 BBL'S CEMENT W/1300 PSI STOPPED PRESSURE. SLOWLY BLEED BACK TO 550 PSI HELD FOR 60 MIN., PRESSURED BACK TO 1300 PSI HELD 30 MIN W/NO PRESSURE LOSS, BLEED PRESSURE TO 0 W/1 BBL, ESTIMATE TOP CEMENT AT 6250'. POOH STAND BACK 52 STANDS, L/D 61 JOINTS. P/U BOP WASHING TOOL AND FLUSH BOP'S, PULL WEAR RING. PULL 9-5/8" PACKOFF THROUGH BOP'S REPLACE W/NEW PACKOFF. KICK OFF 8.5" HOLE MW: 0.0 CONTINUE CHANGE 9 5/8" PACKOFF AND TEST, OK. L/D 3 - 6 1/4" DC'S AND RUNNING TOOL. TEST BOPS AND MANIFOLD, OK. M/U BHA #1, INSTALL MWD PROBE, RIH. SHALLOW TEST MWD. TOOL NOT WEAK PULSE, RIH W/ 10 STANDS TEST MWD NOT WORKING, POH. CHANGE PROBES RIH SHALLOW TEST. CONTINUE RIH FILL PIPE EVERY 1000'. TAG CEMENT 8 6363' TOTAL OF 227' INSIDE PIPE_ P/U KELLY AND CLEAN OUT FIRM CEMENT TO 6595' -- 5' BELOW 9 5/8" SECTION. KICK OFF TIME DRILL OUT OF 9 5/8" SECTION F/ 6595 - 6617' TOTAL OF 23' DRILLING MW- 0.0 vIS: 0 DRILL 8.5" HOLE PASS STUB 8 6635 8 08:00 HRS. DRILL T/6805. PUMP DRY JOB. 10 MIN FLOW CHECK. POOH F/BIT CHANGE. RIH TEST MWD & FILL PIPE 8 3511. DRILL T/7014. DRILLING MW: 0.0 VIS: 0 DRILL T/7411. MUD MOTOR FAILURE. CBU. FLOW CHECK & PUMP DRY JOB. POOH -- FLOW CHECK 8 SHOE. LD MOTOR & BIT, CHANGE MOTOR. LOAD MWD. RIH W/BHA 33. FILL PIPE 84100. MWD CHECK SHOT 87358. DRILL T/7512. WELL ~ : G-30A OPERATION: RIG : DOYON 14 PAGE: 3 07/03/95 ( 8) TD: 8412' ( 900) 07/04/95 ( 9) TD: 8412' ( 0) DRILLING MW: 0.0 VIS: 0 DRILL T/7915. SHUT WELL IN. FLOW INCREASED 5%. SHUT DOWN PUMP & CHECK F/FLOW. PIT GAIN OF 2 BBLS. SHUT WELL IN & MONITOR PRESS @ 0 PSI. OPEN CHOKE T/PITS--NO FLOW. OPEN RAMS-- NO FLOW. CBU & AIRED UP THE MUD. DRILL T/8412. WILL TOOH F/BHA CHANGE @8600'. NO REPORT REC'D F/7/4/95 MW: 0.0 VIS: 0 07/05/95 (10) TD: 9125' ( 713) 07/06/95 (11) TD: 9125' ( 0) 07/07/95 (12) TD: 9266' ( 141) TOOH F/BIT CHANGE MW: 0.0 VIS: 0 DRILL T/9125. CBU, CHK F/FLOW. POOH. HOLE IN GOOD CONDITION. DOWN LOAD MWD, RLL. NO COMMUNICATION W/LWD. CHANGE BITS MU BHA #5. RIH. DRILL TO 9204' MW: 0.0 VIS: 0 BHA RUN NO. 6. RIH TO 8969'. GOT STUCK WHILST PIPE MOVING. JARRED STUCK PIPE AT 8969'. WORK STUCK PIPE F/09:30 HRS TO 13:30 HRS, PUMP AND SPOT LUBE-TEX PILL 25 BB'S WEIGHTED AT 14:00 HRS. PIPE CAME FREE. REAM TIGHT HOLE F/8860' TO 9125'. MAD PASS WHILE REAMING F/9091' TO 9125'. ON BOTTOM. DRILLED TO 9204'. DRILL TANGENT SECTION THROUGH ZONE #3. TOP SAG RIVER 8856' MD, 31' HIGH TVD SHUBLIK 8878' MD, 47' HIGH TVD ZONE 4 8942' MD, 56' HIGH TVD ZONE 3 9105' MD, 50' HIGH TVD DRILLING AHEAD AT 9266' MW: 0.0 VIS: 0 CONTINUE DRILLING W/BIT #5 ON BHA #6 THROUGH ZONE 3 TANGENT SECTION F/9204' TO 9241'. CBU MIX DRY JOB. 10 MIN FLOW CHECK, POOH TO SHOE, CHECK FLOW CONTINUE POOH TO BHA. PULL BHA, REMOVE SOURCE, L/D BIT, NBM STAB'S, CHANGE SLEEVE ON NB STAB, (WORE DOWN 1/2"), DOWNLOAD LWD & L/D. TEST BOP'S AND MANIFOLD 250-5000 PSI (STATE MAN JOHN SPAULDING WAIVED TEST) OK. INSTALL WEAR RING. M/U BHA #7 ON BIT #6 INITIALIZE LWD AND LOAD SOURCE. RIH TO 9141' (FILL PIPE AT 3520, 6519 AT SHOE. REAM OUT OF GAUGE HOLE F/9141' TO 9214'. DRILL F/9214' TO 9266', 14.6 ROP DRILLING IN ZONE 2 CHERT STRINGERS LOOKS LIKE 9310 WILL TRIP FOR BUILDING BHA. ON RIG POWER 24 HRS. WELL : G-30A OPERATION: RIG - DOYON 14 PAGE: 4 07/08/95 (13) TD: 9510' ( 244) 07/09/95 (14) TD: 9823'( 313) DRILLED TO 9510' MW: 0.0 VIS: 0 DRILLED TO 9328'. REACHED PLANNED END OF RUN - DIRECTIONAL OBJECTIVE MET. DRILLED THE CHERT SECTION IN ZONE 2. CIRCULATED AT 9328'. OBTAINED BOTTOMS UP (100% ANNULUS VOLUME). PULLED OUT OF HOLE TO 1103' 10 MIN FLOW CHECK, PUMP DRY JOB, POOP TO 9-5/8" SHOE. CHECK FOR FLOW. POOH TO BHA. BHA PULLED AND STOOD BACK. MADE UP BHA NO. 8 W/1.75 BH MOTOR, FOR BUILDING SECTION UP TO 90 AT 9875' TARGET DEPTH. RIH TO 3521'. STOPPED: TO HOLD DRILL. HELD DRILL (KICK WHILE TRIPPING), AMAS 90 SEC. COMPLETED OPERATIONS. RIH TO 9170', FILL PIPE AT 6513'. STOPPED: TO TAKE SURVEY. LOGGED HOLE WITH LWD: FORMATION EVALUATION (FE) FROM 9170' TO 9328'. RUN DIRECTIONAL CHECK SHOT AT 9215'. COMPLETED OPERATIONS. DRILLED TO 9510'. CONTINUE DIRECTIONAL DRILLING 8.5" TARGET DEPTH 9005' TVD AND 9873' MD. CIRCULATED AT 9823' MW: 0.0 VIS: 0 CONTINUE DIRECTIONAL DRILLING 8.5" HOLE F/9510' TO 9638' -- DOWNHOLE MEASUREMENT TOOLS FAILED - END BHA RUN. LOST 300 PSI INSTANTLY AND MWD QUIT PULSING AT SAME TIME. CIRCULATED AT 9638'. OBTAINED BOTTOMS UP (100% ANNULUS VOLUME). PULLED OUT OF HOLE TO 2491'. 10 MIN FLOW CHECK, POOH. TO SHOE, CHECK FOR FLOW CONTINUE POOH TO BHA. PULLED BHA AND LAID OUT. L/D MWD PULSING PORT WASHED OUT. MADE UP BHA NO. 9. P/U MWD PULSER SUB. RIH TO 3428' STOPPED TO HOLD DRILL. HELD DRILL (KICK WHILE TRIPPING). FILL PIPE AT 3428'. D1 KICK DRILL AMAS 8 SEC. COMPLETED OPERATIONS. RIH TO 6519' FILL PIPE AT SHOE. STOPPED: TO CIRCULATE. RIH TO 9215' STOPPED: TO TEST EQUIPMENT. BENCHMARK SURVEY AT 9170' AND 9215' RIH TO 9638'. WORK PIPE THROUGH BEGINNING OF BUILD SECTION AT 9330'. THIS BUILD SECTION WILL HAVE TO BE REAMED OUT WTIH HOLE OPENER RUN. ON BOTTOM. DRILLED TO 9823' STOPPED TO CORRELATE DEPTH. CIRCULATE TD 8.5" HOLE. CIRCULATED AT 9823'. OBTAINED BOTTOMS UP (100% ANNULUS VOLUME). WELL : G-30A OPERATION: RIG : DOYON 14 PAGE: 5 07/10/95 (15) TD: 9823' ( 0) 07/11/95 (16) TD: 9823' ( 0) RUN 7" CASING (SLM) MW: 0.0 VIS: 0 CIRCULATED AT 9823' OBTAINED BOTTOMS UP (100% ANNULUS VOLUME). CIRCULATED AND CLEAN HOLE AT 9823' TD, 8.5". PULLED OUT OF HOLE TO 2491'. 10 MIN. FLOW CHECK, PUMP DRY JOB, L/D 12 JT'S POOH. BHA PULLED AND LAID OUT. L/D MOTOR, DOWN LOAD MWD-LWD AND L/D. MADE UP BHA NO. 10. P/U 8.5" HOLE OPENER, TO REAM F/9200' TO 9823'. RIH TO 6590'. RIH FILL PIPE AT 6590'. STOPPED: TO SERVICE DRILLING EQUIPMENT. HELD DRILL (KICK WHILE DRILLING). AMAS 2 MIN 15 SEC. COMPLETED OPERATIONS. SERVICED BLOCK LINE. SLIP AND CUT DRILLING LINE 59.5'. EQUIPMENT WORK COMPLETED. RIH TO 9205'. STOPPED: TO PICK UP/LAY OUT TUBULARS. REAMED AT 9823'. HOLE OPENER RUN, REAM LAST 2 MOTOR RUNS F/9205' TO 9823'. CIRCULATED AT 9823'. OBTAINED BOTTOMS UP (100% ANNULUS VOLUME). PULLED OUT OF HOLE TO 6400'. POOH AND STAND BACK 68 STANDS DP TO RUN 7" CASING (SLM) . STOPPED: TO PICK UP/LAY OUT TUBULARS. PERFORMED CEMENT INTEGRITY TST MW: 0.0 VIS: 0 LAID DOWN DRILL PIPE TO 5500', 90 JTS 5" DP. RUN CASING, 7" OD. RAN CASING TO 3367'. AT TOP OF LINER 3367'. P/U LINER HANGER. CIRCULATED AT 3367'. CIRCULATE LINER VOLUME 125 BBL'S STOPPED: TO CIRCULATE. RAN DRILL PIPE TO 6590' -- FILL PIPE EVERY 10 STANDS WHILE RUNNING 7" LINER. AT 9-5/8" CASING SHOE. CIRCULATED AT 6590'. CIRCULATE DP & 7" CASING VOLUME. OBTAINED CLEAN RETURNS (100% HOLE VOLUME). RAN CASING ON LANDING STRING TO 9823'. RUN 7" CASING TO BOTTOM TIGHT AT 9375'. AT 7" CASING SHOE. CIRCULATED AT 9823' CIRCULATE AND RECIPROCATE 7" 30' PER/STROKE FOR 2 HRS, HAD BJ START BATCH MIXING CEMENT. BROKE CIRCULATION. CEMENT: CASING CEMENT. PUMPED SPACERS - VOLUME 70 BBLS. REQUIRED VOLUME OF SPACER PUMPED. MIXED AND PUMPED SLURRY - 83 BBLS. RELEASED DART. DISPLACED SLURRY - 229 BBLS. PLUG BUMPED. BUMP PLUG W/4000 PSI SET HANGER, RELEASED AND LINER TOP PACKER 6456'. REVERSE CIRCULATED AT 6456' OBTAINED CLEAN -- RETURNS - 150% HOLE VOLUME. REVERSED OUT F/LINER TOP AT 6456' W/7.5 BPM AT 1100 PSI. NO CEMENT AND HAD 39.5 BBLS SPACER TOTAL OF 391 STK'S. PULL DRILL PIPE, 5" OD. PULLED DRILLPIPE IN STANDS TO 3000'. POOH L/D CEMENT HEAD, STAND BACK 32 STDS. COMPLETED OPERATIONS. LAID DOWN DRILLPIPE TO 3456'. L/D 5" DP AND BAKER RUNNING TOOL. COMPLETED OPERATIONS. PERFORM CEMENT INTEGRITY TEST. TEST 9-5/8" AND 7" CASING AND LINER TOP PACKER TO 3500 PSI. OK. COMPLETED OPERATIONS. WELL : G-30A OPERATION: RIG : DOYON 14 PAGE: 6 07/12/95 (17) TD: 9823 PB: 9017 07/13/95 (18) TD: 9823'( 07/14/95 (19) TD: 9823'( o) o) CIRCULATED AT 6400' MW: 0.0 PERFORM INTEGRITY TEST. 9-5/8" AND 7" CASING TEST FAILED ON SECOND TEST LEAKED OFF TO 1100 PSI. TESTED SURFACE LINES/EQUIPMENT - OK. FUNCTION TEST COMPLETED SATISFACTORILY. RUN DRILLPIPE, 3-1/2" OD TO 500'. P/U 147 JTS 3.5" DP ON BAKER 7.5" SEAL ASSY AND 9-5/8" RTTS TEST PACKER. AT TOP OF LINER: 6456'_ RAN DRILLPIPE IN STANDS TO 6456'. RIH TO 7" LINER TOP AT 6456' STOPPED: TO CIRCULATE. TESTED TIE BACK PACKER - VIA STRING. PRESSURE UP TO 3000 PSI BLEED BACK TO 1500 PSI. TEST ANNULUS TO 3000' PSI FOR 30 MIN. - OKAY. SUSPENDED PRESSURE TEST ON TUBULAR STRINGS, OBSERVED LEAK. PULLED DRILL PIPE IN STANDS TO 0'. POOH L/D BAKER TEST PACKER. COMPLETED OPERATIONS. RUN DRILL PIPE 3-1/2" OD. P/U BAKER 7" TEST PACKER. RAN DRILLPIPE TO 6456'. RIH W/BAKER 7" RETRIEVE-O-MATIC TEST PACKER. STAB-IN 7" LINER TOP AT 6456' SET 7" TEST PACKER IN TOP JT AT 6479'. PERFORM INTEGRITY TEST. INVESTIGATED PRESSURE CHANGE. SET 7" BAKER RETRIEVE-O-MATIC TEST PACKER AT 6479', 7" JT BELOW 7" LINER HANGER. TEST DOWN DP TO PLUG CATCHER W/3000 PSI GOOD. TEST DOWN ANNULUS LEAK 2000 PSI 3 BPM. INJECTION RATE. COMPLETED OPERATIONS. RUN DRILLPIPE 3-1/2" OD TO 6400' P/U 9-5/8" BAKER CEMENT RETAINER AND RIH TO 6400'. STOPPED: TO PRESSURE TEST. FLUID SYSTEM - CIRCULATED AT 6400'. CIRCULATE AND MUD TO SQUEEZE LINER. OBTAINED REQ'D FLUID PROPERTIES - 100% HOLE VOLUME. POOH F/6" MILL MW: 0.0 VIS: 0 CBU. SQUEEZE CMT.. PUMP DRY JOB & POOH T/3300. RIH T/5400. BREAK CIR. STAB INTO RETAINER & TEST T/2000#. OK. POOH F/NEW BIT. DRILL EZSV @ 6400 & CMT T/6456 LINER TOP. CBU & POOH F/6" MILL. DRLG CEMENT MW: 0.0 VIS: 0 PULLED DRILLPIPE IN STANDS. FINISH POH, LAY DOWN JUNK BASKETS. MAKE UP AN DRIH W. BHA #12 TO 5938' RAN DRILLPIPE IN STANDS TO 6400'. FILLED DRILL PIPE. DRILL CEMENT AND STRINGERS. TEST SQUEEZE JOB IN 7" CSG. RAN DRILLPIPE IN STANDS TO 9700'. DRILL CENET STRINGERS TO TOP OF LANDING COLLAR AND DRILL, DP WIPER PLUG. PULLED DRILLPIPE IN STANDS TO 0.0' PULLED BHA. TESTED BOP STACK. PULL WR - TEST BOPE - RUN WR. MADE UP BHA #13. SHALLOW TEST MWD. RAN DRILLPIPE IN STANDS TO 9737'. FINISH RIH TO 9737' W/ 5" DP. TOP OF LANDING COLLAT @ 9737'. SLIP AND CUT DRLG LINE_ DRLG LANDING COLLAR, CEMENT FLOAT COLLAR AND SHOE F/ 9737 - 9823' WELL : G-30A OPERATION: RIG - DOYON 14 PAGE: 7 07/15/95 (20) TD:10436 PB: 9024 07/16/95 (21) TD:10675 PB: 9029 07/17/95 (22) TD:10909 PB: 9000 07/18/95 (23) TD:lll05' (1282) 07/19/95 (24) TD:11429' ( 324) 07/20/95 (25) TD:11789'( 360) 07/21/95 (26) TD:11789' ( 0) DRLG & SURVEY TO 10436 MW: 0.0 DRILLED TO 10' BELOW 7" SHOE. PULL DP, 5" OD. PULLED DP IN STANDS TO 9644' TO PERFORM PRE GAMMA RAY PRO-FLO CALIBRATION. CIRCULATED AT 9644'. RUN DP IN STANDS TO 9833'. RIH TO BOTTOM TO CHANGE OVER TO FLO-PRO MUD. AT TOP OF NEW HOLE SECTION, 9833'. CIRCULATE AT 9833'. DISPLACE DRLG FLUID W/FLO-PRO MUD. PUMP 50 BBL. WATER W/2.61% SAFE CLEAN-100 BBL. KCL WATER AND 500 BBL, FLO-PRO MUD. HOLE DISPLACED WITH WATER BASED MUD - 100% DISPLACED. PULLED DP IN STANDS TO 9617'. CIRCULATE AT 9617'. PERFORMING POST GAMMA RAY FLO-PRO CALIBRATION. CORRELATE DEPTH. LOGGED HOLE WITH LWD: FORMATION EVALUATION FROM 9617' TO 9833'. DRILLED AND SURVEYS F/9833 TO 10436'. DRILLED TO 10675' MW: 0.0 DRILL & SURVEY F/10436 TO 10507. CBU AT 10507. DOWNLOADED MWD TOOL, CHANGE BITS, CHANGE OUT MWD PROBE AND CHANGE OUT JARS #0036 AND 0037. PACKING WAS OUT ON JAR #0036. RIH TO 5945'. RIH TO 10507'. DRILL & SURVEY F/10507 TO 10675' POH F/NEW BIT MW: 0.0 DRILL & SURVEY F/10675 TO 10909. CBU AT 10909-. 10 MIN FLOW CHECK AND POH TO 10560'. MAD PASSES F/10560-10600=10630 TO 10680=10800 TO 10840. 10 MIN FLOW CHECK POH TO 7" SHOE AT 9823'. DRILLING & SURVEYS MW: 0.0 VIS: 0 RIH TO 5755'. RIH TO SHOE AT 9823' AND FILL PIPE. RIH TO 10496', CHECK SHOT SURVEY. RIH TO 10869'. FILL PIPE. FLOW CHECK AND POH TO SHOE. RIH TO 10855', BREAK CIRC, CHECK SHOT SURVEY AT 10869'. MAD PASS F/10869' TO 10909 AT 70 FPH. DRILLING AND SURVEYS F/10909' TO 11105' DRILLING & SURVEYS MW: 0.0 VIS: 0 DRLG AND SURVEYS. SLIDE 50%, ROTATE 50% OF EACH KELLY TO KEEP TURNING LEFT INTO TARGET. ADD LUBE TEX FOR BETTER PENETRATION WHILE SLIDING THRU SHALE. DRILL F/ 11105 - 11429' PICK UP KELLY & CIRC MW: 0.0 VIS: 0 DRLG AND SURVEYS F/ 11429 - 11789'. PENETRATION RATE SLOWED AND PRESSURE BUILT. FLO CHECK. LAY DOWN 32 JOINTS, FLO CHECK AT BHA. LAY DOWN BHA. PICK UP NEW BHA. RIH TO 5700' BREAK CIRC. RU SIDE ENTRY SUB MW: 0.0 VIS: 0 OPEN HOLE F/10606 T/11780. CIRC HOLE CLEAN. STOP F/FLOW CHECK. LD BHA. MU ATLAS WL & RIH W/LOGGING TOOLS. RU SIDE ENTRY SUB. WELL : G-30A OPERATION: RIG : DOYON 14 PAGE: 8 07/22/95 (27) TD:l1790' ( 1) 07/23/95 (28) TD:ll800' ( 10) 07/24/95 (29) TD:ll800 PB:l1715 07/25/95 (30) TD:ll800 PB:l1715 07/26/95 (31) TD:ll800 PB:l1715 DRLG. NEW HOLE MW: 0.0 VIS: 0 RIG UP ATLAS WIRELINE, INSTALL SIDE ENTRY SUB, RIG W/WIRELINE & HOOKUP TO WET CONNECT - RIH TO 11700. POH LOGGING, MAKE 4 PASSES, 10 MIN. FLO. CHECK. POH TO 8950 W/ ATLAS WIRELINE, RIG DOWN SIDE ENTRY SUB. 10 MIN. FLO. CHECK, POH W/LOGGING TOOLS. MAKE UP BHA & RIH TO 6350, FILL PIPE, RIH TO 11780. CAUTION REAM 40' TO BOTTOM F/11740 TO 11780. DRLG. F/11780 TO 11790. REVERSE CIRC. MW: 0.0 VIS: 0 DRLG. F/11790 TO 11800. (TD) CBU, SPOT LUBE TEX PILL IN OPEN HOLE. 10 MIN. FLO. CHECK, POH TO SHOE @9823, 10 MIN. FLO. CHECK, POH. RIG UP CSG. EQUIP. AND RUN 51 JTS. 4.5" 12.6# L-80 NSCT LINER, MAKE UP T/W HANGER & PACKER, CIRC. LINER VOLUME. RIH W/ 4.5 LINER ON DP TO 9823. (FILL EVERY 10 STANDS). CIRC. CAPACITY OF LINER & DP @ 5 BPM W/1500#. RIH W/LINER IN OPEN HOLE TO 11800. CIRC. W/6.5 BPM-2300#. PUMP 5 BBLS. WATER, TEST LINES 3500# PUMP 15 BBLS. WATER, PUMP 20 BBLS. 2% KCL WATER, PUMP 48 BBLS. CLASS 'G' CEMENT W/ADDITIVES AS PER PROGRAM. FLUSH CEMEMT LINES & KICK PLUG OUT W/10 BBLS. WATER, FOLLOWED W/141 BBLS. MUD. BUMP PLUG W/3500#, FLOATS HELD OK, CIP @0530, HANGER SET. REVERSE CIRC. OUT EXCESS CEMENT POH F/PERF GUNS MW: 0.0 FINISH REVERSE OUT CEMENT, 10 BBLS. CEMENT RETURNED. POH W/RUNNING TOOL & LAY DOWN SAME. MAKE UP NEW BHA, RIH, BREAK CIRC. @9850 CEMENT STRINGER @11610. PICK UP KELLY & WASH DOWN TO LANDING COLLAR @11715. CIRC. CLEAN. ATTEMPT TEST ON CSG. TEST LEAKED OFF F/3000 TO 1300# 15 MIN. DISPLACE WELL TO SEAWATER @5.5 BPM. POH W/ 2 7/8" TO P/U PERF GUNS. LAYING DOWN PERF GUNS MW: 0.0 FINISH POH LAY DOWN 11 JTS. 2 7/8" PAC TBG. RIH CLOSE FAST FILL VALVE TAG BOTTOM @11715. RIG UP HES TEST MANIFOLD. SET PACKER @9570 BOTTOM PERF SHOT @11700 TOP @9830 CLOSE ANNULAR PREVENTER. PRESSURE UP ON BACKSIDE GUNS FIRED @2300#-BLEED PRESSURE TO 500#. POH & LAY DOWN HES TOOLS POH F/MILLING ASSEMBLY MW: 0.0 FINISH LAYING DOWN 2 3/4" WESTERN ATLAS PERF GUNS. MAKE UP 4.5" SCRAPER & RIH TO 11400. CIRC. HOLE CLEAN. POH F/4.5" PACKER. RIH TO 9685. PACKER SET @9685. POH F/MILLING ASSEMBLY WELL : G-30A OPERATION: RIG : DOYON 14 PAGE: 9 07/27/95 (32) TD:l1715' ( 0) 07/28/95 (33) TD:l1716' ( 1) 07/29/95 (34) TD:l1716 PB: 8964 07/30/95 (35) TD:l1716 PB: 8964 07/31/95 (36) TD:l1716 PB: 8964 RIH TO 9500 FT. MW: 0.0 VIS: 0 PULL DRILLPIPE. TEST WELL CONTROL EQUIP. BHA RUN NO. 18. RIH TO 9675. MILLED OTHER SUB-SURFACE EQUIP AT 9676 FT. CBU AT 9700 FT. OBTAINED CLEAN RETURNS 50% HOLE VOLUME. POOH TO 5000 FT. COMP. OPERATION. POOH TO 200 FT. PULLED BHA. BHA NO. 19 MADE UP. RIH TO 9500 FT. AT 9500' TOP OF FISH @9700'+- FLUID LOSS TO FORMATION 8 TO 10 BPH. POOH TO 5000 FT. MW: 0.0 VIS: 0 BHA RUN NO. 19. RIH TO 11715. POOH TO 200 FT. PULLED BHA. BHA RUN NO. 20. RIH TO 9667 FT. RIH TO 4.5" LINER TOP @9667' STOPPED TO CBU. RIH TO 11716 FT. RIH TO PBTD @11716 PULL BACK TO 11676' 40' CBU AT 11676 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. POOH TO 9667 FT. CBU AT 9667 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. POOH TO 5000 FT. L/D DRILLPIPE TO 0 FT. MW: 0.0 BHA RUN NO. 20. POOH TO 200 FT. PULLED BHA. BHA LAID OUT. SET PACKER AT 11370 FT. LAID DOWN DRILLPIPE TO 0 FT. COMPLETED OPERATIONS. RIGGED DOWN BOP STACK MW: 0.0 RUN TUBING 3 1/2" O.D. RIGGED UP TUBING HANDLING EQUIP. RAN TUBING TO 7300 FT. STOPPED TO TEST EQUIP. RAN TUBING TO 9400 FT. TESTED DUAL CONTROL LINE. PRESSURE TEST COMPLETED SUCCESSFULLY - 5000 PSI. CBU AT 9456 FT. OBTAINED REQ'D FLUID PROPERTIES - 100% HOLE VOLUME. CBU AT 9456 FT. NIPPLE DOWN BOP STACK. RIG REL. SUMMER MAINT. MW: 0.0 WELLHEAD WORK. INSTALLED ALL TREE VALVES. PERFORM INTEGRITY TEST. FREEZE PROTECT WELL 150 BBL. OF DIESEL. R/U AND "U" TUBE DIESEL BACK TO TBG, HAUL OFF SEAWATER AND PUMP OUT CELLAR. RELEASED RIG AT 1800 HRS. SIGNATURE: (drilling superintendent) DATE: S~ ,RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLING PBU/G-30A 500292022101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/21/95 TRUE SUB-SEA COURS COURSE MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES DATE OF SURVEY: ;~, .~, 95 MWD SURVEY m//¥.//,,~ JOB NUMBER: AK-RB-9~53~: KELLY BUSHING ELEV. ~;'/~/.~,8 FT. OPERATOR: BP EXPLORATI~/~<// DLS TOTAL RECTANGULAR COORDINATES VERT. DG/100 NORTH/SOUTH EAST/WEST SECT. 6498 6151.50 6080.92 6590 6229.79 6159.21 6595 6234.06 6163.48 6714 6339.33 6268.75 6811 6427.57 6356.99 31 22 N 87.80 E .00 31 16 N 88.10 E .20 31 16 N 88.10 E .40 26 1 S 78.80 E 6.81 22 46 S 68.47 E 5.52 131.70N 1481.00E 1481.00 133.40N 1528.62E 1528.62 133.49N 1531.22E 1531.22 129.41N 1588.20E 1588.20 118.39N 1626.52E 1626.52 6903 6513.70 6443.12 6997 6604.54 6533.96 7091 6697.96 6627.38 7184 6790.77 6720.19 7279 6884.73 6814.15 18 0 S 52.54 E 7.93 10 49 S 40.00 E 8.30 4 38 S 57.47 E 6.95 5 0 N 83.10 E 3.51 3 42 N 87.88 E 1.43 103.21N 1654.36E 1654.36 87.61N 1671.57E 1671.57 78.76N 1680.49E 1680.49 77.22N 1687.70E 1687.70 77.83N 1694.81E 1694.81 7330 6935.83 6865.25 7405 7011.27 6940.69 7496 7101.57 7030.99 7590 7196.30 7125.72 7682 7288.14 7217.56 0 41 N 72.84 E 5.94 1 45 N 89.64 W 3.20 2 7 S 87.33 W .42 2 10 S 36.51 W 1.95 2 22 S 21.90 W .66 77.98N 1696.76E 1696.76 78.12N 1696.04E 1696.04 78.05N 1692.99E 1692.99 76.52N 1690.17E 1690.17 73.35N 1688.42E 1688.42 7776 7381.42 7310.84 7869 7475.19 7404.61 7963 7568.65 7498.07 8055 7661.09 7590.51 8148 7754.19 7683.61 2 18 S 18.59 W .16 0 45 S 36.73 W 1.71 0 38 N 67.94 W .92 0 47 N 56.60 W .22 0 58 N 46.01 W .27 69.78N 1687.10E 1687.10 67.49N 1686.12E 1686.12 67.19N 1685.27E 1685.27 67.73N 1684.26E 1684.26 68.64N 1683.15E 1683.15 8241 7846.58 7776.00 8335 7941.13 7870.55 8429 8034.93 7964.35 8530 8135.26 8064.68 8623 8228.01 8157.43 0 57 N 33.86 W .22 1 7 N 45.49 W .28 1 8 N 41.38 W .09 2 9 S 63.22 E 3.22 9 37 S 50.50 E 8.08 69.82N 1682.15E 1682.15 71.12N 1681.06E 1681.06 72.47N 1679.79E 1679.79 72.37N 1680.81E 1680.81 66.61N 1688.40E 1688.40 8714 8316.87 8246.29 8808 8405.16 8334.58 8901 8489.47 8418.89 8993 8567.85 8497.27 9069 8629.22 8558.64 16 23 S 48.90 E 7.43 22 23 S 54.10 E 6.66 28 55 S 53.24 E 7.00 33 24 S 57.96 E 5.56 38 3 S 59.41 E 6.26 53.28N 1704.00E 1704.00 34.12N 1728.42E 1728.42 10.iON 1761.03E 1761.03 16.56S 1800.19E 1800.19 39.47S 1837.91E 1837.91 9150 8691.03 8620.45 9184 8715.99 8645.41 9206 8732.28 8661.70 9238 8755.73 8685.15 9277 8784.13 8713.55 42 37 S 58.86 E 5.64 42 43 S 59.01 E .42 42 23 S 58.7-0 E 1.77 43 9 S 58.00 E 2.81 44 34 S 58.50 E 3.71 66.41S 1882.96E 1882.96 78.28S 1902.67E 1902.67 86.02S 1915.47E 1915.47 97.40S 1933.94E 1933.94 111.76S 1957.14E 1957.14 MICi OFILMED S~ .<RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-30A 500292022101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/21/95 DATE OF SURVEY: 072095 MWD SURVEY JOB NUMBER: AK-RB-950730 KELLY BUSHING ELEV. = 70.58 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORD DEGREES DG/100 NORTH/SOUTH EAST INATES /WEST VERT. SECT. 9310 8807.12 8736.54 9341 8828.61 8758.03 9372 8848.20 8777.62 9404 8866.43 8795.85 9436 8884.19 8813.61 45 49 48 45 52 55 55 33 57 16 S 58.70 E 3.86 123.82S 1976.90E S 57.60 E 9.62 136.11S 1996.67E S 58.50 E 13.63 148.83S 2017.09E S 59.10 E 8.57 161.95S 2038.75E S 59.30 E 5.35 175.65S 2061.73E 1976.90 1996.67 2017.09 2038.75 2061.73 9467 8901.13 8830.55 9498 8917.07 8846.49 9530 8932.67 8862.08 9560 8946.70 8876.12 9592 8959.88 8889.30 58 6 . 60 1 60 46 63 48 67 17 S 59.70 E 2.86 S 60.90 E 7.03 S 63.00 E 6.24 S 61.60 E 10.87 S 63.00 E 11.64 189.24S 2084.81E 202.41S 2107.90E 215.32S 2132.13E 227.75S 2155.79E 241.21S 2181.45E 2084.81 2107.90 2132.13 2155.79 2181.45 9623 8971.11 8900.53 9654 8981.85 8911.27 9685 8992.20 8921.62 9716 9001.07 8930.49 9746 9008.13 8937.55 69 33 69 55 71 44 74 50 77 58 S 63.20 E 7.46 S 63.40 E 1.34 S 64.10 E 6.11 S 64.50 E 10.15 S 65.50 E 10.90 254.06S 2206.78E 267.14S 2232.77E 280.31S 2259.49E 293.13S 2286.14E 305.48S 2312.62E 2206.78 2232.77 2259.49 2286.14 2312.62 9860 9024.61 8954.03 9891 9026.51 8955.93 9922 9026.92 8956.34 9953 9026.16 8955.58 9984 9025.15 8954.57 85 18 87 43 90 46 92 0 91 46 S 65.60 E 6.46 S 66.49 E 8.27 S 66.89 E 9.78 S 67.60 E 4.53 S 67.45 E .86 351.88S 2414.68E 364.52S 2443.12E 376.96S 2471.99E 389.09S 2500.91E 400.84S 2529.32E 2414.68 2443.12 2471.99 2500.91 2529.32 10016 9024.65 8954.07 10047 9024.95 8954.37 10079 9025.43 8954.85 10110 9025.91 8955.33 10141 9026.11 8955.53 90 1 S 68.34 E 6.24 88 53 S 68.17 E 3.65 89 20 S 69.05 E 3.18 88 53 S 69.54 E 2.13 90 22 S 70.94 E 6.59 412.67S 2558.44E 424.38S 2587.81E 435.75S 2616.84E 446.91S 2646.37E 457.36S 2675.45E 2558.44 2587.81 2616.84 2646.37 2675.45 10172 9025.87 8955.29 10203 9025.54 8954.96 10234 9025.32 8954.74 10265 9025.17 8954.59 10296 9024.92 8954.34 90 31 S 70.49 E 1.53 90 40 S 71.32 E 2.68 90 9 S 70.42 E 3.43 90 24 S 70.98 E 1.98 90 31 S 72.16 E 3.79 467.60S 2704.72E 477.91S 2734.48E 487.88S 2763.24E 498.10S 2792.41E 508.00S 2822.13E 2704.72 2734.48 2763.24 2792.41 2822.13 10327 9024.50 8953.92 10356 9024.16 8953.58 10388 9024.38 8953.80 10419 9025.12 8954.54 10451 9026.20 8955.62 91 2 S 73.99 E 6.16 90 18 S 76.09 E 7.66 88 53 S 79.03 E 10.32 88 24 S 80.57 E 5.14 87 41 S 82.30 E 5.92 516.99S 2851.68E 524.48S 2879.70E 531.29S 2910.58E 536.86S 2941.52E 541.56S 2972.74E 2851.68 2879.70 2910.58 2941.52 2972.74 .~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-30A 500292022101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/21/95 DATE OF SURVEY: 072095 MWD SURVEY JOB NUMBER: AK-RB-950730 KELLY BUSHING ELEV. = 70.58 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10487 9027.64 8957.06 10519 9028.62 8958.04 10550 9029.19 8958.61 10582 9029.79 8959.21 10613 9030.03 8959.45 87 46 S 83.70 E 3.84 546.00S 3008.93E 88 42 S 84.08 E 3.16 549.39S 3040.52E 89 8 S 86.81 E 9.01 551.82S 3071.08E 88 44 S 89.31 E 7.81 552.92S 3103.45E 90 22 N 89.50 E 6.57 552.97S 3134.15E 3008.93 3040.52 3071.08 3103.45 3134.15 10643 9029.03 8958.45 10673 9026.86 8956.28 10704 9023.96 8953.38 10732 9021.05 8950.47 10763 9017.84 8947.26 93 21 N 88.96 E 9.90 552.56S 3164.80E ~ 94 57 N 85.88 E 11.59 551.22S 3194.57E 96 2 N 83.94 E 7.30 548.54S 3224.61E 95 34 N 82.29 E 5.94 545.11S 3252.99E 96 17 N 82.00 E 2.50 540.89S 3283.59E 3164.80 3194.57 3224.61 3252.99 3283.59 10794 9014.37 8943.79 10830 9010.08 8939.50 10857 9006.73 8936.15 10887 9003.10 8932.52 10921 8999.34 8928.76 96 46 N 80.19 E 6.11 536.20S 3313.54E 96 52 N 77.65 E 6.99 529.31S 3348.73E 97 18 N 74.72 E 10.84 522.88S 3374.88E 96 41 N 72.30 E 8.34 514.50S 3403.18E 95 49 N 69.94 E 7.24 503.41S 3435.62E 3313.54 3348.73 3374.88 3403.18 3435.62 10953 8996.25 8925.67 10981 8993.65 8923.07 11013 8991.22 8920.64 11044 8989.50 8918.92 11075 8987.85 8917.27 95 33 N 70.16 E 1.14 492.81S 3464.82E 95 3 N 68.32 E 6.74 482.87S 3491.04E 93 35 N 68.23 E 4.52 471.01S 3520.81E 92 48 N 67.19 E 4.25 459.33S 3549.29E 93 18 N 64.90 E 7.57 446.79S 3577.52E 3464.82 3491.04 3520.81 3549.29 3577.52 11106 8985.95 8915.37 11138 8983.86 8913.28 11169 8981.78 8911.20 11199 8979.74 8909.16 11230 8977.68 8907.10 93 45 N 63.33 E 5.29 433.33S 3605.25E 93 46 N 63.87 E 1.69 419.20S 3633.73E 93 52 N 61.97 E 6.10 405.06S 3661.38E 93 47 N 61.24 E 2.40 390.56S 3688.19E 93 49 N 60.33 E 2.93 375.49S 3715.15E 3605.25 3633.73 3661.38 3688.19 3715.15 11261 8975.52 8904.94 11293 8973.41 8902.83 11324 8971.35 8900.77 11355 8969.49 8898.91 11387 8968.10 8897.52 94 7 N 58.85 E 4.82 359.70S 3742.05E 93 34 N 58.10 E 2.96 343.34S 3768.73E 93 58 N 57.36 E 2.68 326.63S 3795.19E 92 53 N 57.07 E 3.59 309.78S 3821.34E 92 10 N 57.04 E 2.27 292.80S 3847.55E 3742.05 3768.73 3795.19 3821.34 3847.55 11419 8966.83 8896.25 11450 8965.78 8895.20 11482 8965.31 8894.73 11512 8965.18 8894.60 11544 8965.04 8894.46 92 22 N 56.03 E 3.20 275.14S 3874.27E 91 28 N 54.41 E 5.91 257.32S 3899.93E 90 13 N 54.09 E 4.06 238.61S 3925.91E 90 16 N 53.58 E 1.71 220.92S 3950.12E 90 13 N 53.37 E .68 201.94S 3975.74E 3874.27 3899.93 3925.91 3950.12 3975.74 .RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SIiARED SERVICES DRILLING PBU/G-30A 500292022101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/21/9 DATE OF SURVEY: 072095 MWD SURVEY JOB NUMBER: AK-RB-950730 KELLY BUSHING ELEV. = 70.58 FT. OPERATOR: BP EXPLOR3tTION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/100 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERT. SECT. 11575 8964.90 8894.32 90 16 N 52.85 E 1.68 183.26S 4000.63E 11606 8964.71 8894.13 90 25 N 52.49 E 1.25 164.26S 4025.54E 11637 8964.33 8893.75 90 56 N 52.02 E 2.25 145.19S 4050.18E 11669 8964.08 8893.50 89 58 N 51.79 E 3.22 125.92S 4074.76E 11701 8964.24 8893.66 89 26 N 51.67 E 1.67 106.13S 4099.84E 4000.63 4025.54 4050.18 4074.76 4099.84 11732 8964.44 8893.86 89 49 N 51.78 E 1.23 86.75S 4124.40E 11746 8964.49 8893.91. 89 46 N 51.14 E 4.59 78.05S 4135.33E 11789 8964.66 8894.08 89 46 N 51.14 E .00 51.28S 4168.55E 4124.40 4135.33 4168.55 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4168.87 FEET AT SOUTH 89 DEG. 17 MIN. EAST AT MD = 11789 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 90.00 DEG. TIED IN AT 6498.35' INTERPOLATED DEPTH 11789' SA .~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-30A 500292022101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/21/95 INTERPOLATED VALUES DATE OF SURVEY: 072095 JOB NUMBER: AK-RB-950730 KELLY BUSHING ELEV. = 70.58 OPERATOR: BP EXPLORATION FOR EVEN 1000 FEET OF MEASURED DEPTH FT. TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 6498 6151.50 6080,92 131.70 N 1481.00 E 346,85 7498 7103,88 7033,30 78,05 N 1692,91 E 394,47 8498 8103,55 8032,97 72,74 N 1679.98 E 394.80 9498 8916,77 8846,19 202,16 S 2107,45 E 581,58 10498 9028,05 8957,47 547,17 S 3019,47 E 1470,29 11498 8965,24 8894,66 229,26 S 3938,81 E 2533,11 11789 8964,66 8894,08 51,28 S 4168,55 E 2824,34 47.62 .34 186,78 888,71 1062,81 291,24 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD, S~ _(RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SI4_ARED SERVICES DRILLING PBU/G-30A 500292022101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/21/95 DATE OF SURVEY: 072095 JOB NUMBER: AK-RB-950730 KELLY BUSHING ELEV. = 70.58 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 6498 6151.50 6080.92 131.70 N 1481.00 E 346.85 6520 6170.58 6100.00 132.15 N 1492.63 E 350.12 6637 6270.58 6200.00 133.45 N 1552.51 E 366.70 6749 6370.58 6300.00 126.08 N 1602.62 E 378.87 3.27 16.58 12.17 6857 6470.58 6400.00~ 111.28 N 1641.84 E 387.37 6962 6570.58 6500.00 92.92 N 1666.52 E 392.09 7064 6670.58 6600.00 80.41 N 1678.38 E 393.64 7164 6770.58 6700.00 77.16 N 1685.99 E 394.00 7264 6870.58 6800.00 77.80 N 1693.90 E 394.32 8.50 4.72 1.55 .36 .32 7364 6970.58 6900.00 78.09 N 1697.01 E 394.40 7465 7070.58 7000.00 78.11 N 1694.14 E 394.45 7565 7170.58 7100.00 77.31 N 1690.75 E 394.52 7665 7270.58 7200.00 74.03 N 1688.69 E 394.59 7765 7370.58 7300.00 70.19 N 1687.24 E 394.68 .O8 .05 .07 .08 .08 7865 7470.58 7400.00 67.54 N 1686.16 E 394.73 7965 7570.58 7500.00 67.20 N 1685.25 E 394.73 8065 7670.58 7600.00 67.81 N 1684.15 E 394.74 8165 7770.58 7700.00 68.83 N 1682.95 E 394.75 8265 7870.58 7800.00 70.16 N 1681.93 E 394.77 .05 .01 .01 .01 .01 8365 7970.58 7900.00 71.53 N 1680.65 E 394.79 8465 8070.58 8000.00 72.78 N 1679.63 E 394.80 8565 8170.58 8100.00 71.12 N 1682.68 E 394.90 8666 8270.58 8200.00 61.13 N 1694.91 E 396.22 8771 8370.58 8300.00 42.11 N 1717.73 E 400.62 .02 .01 .09 1.33 4.39 8880 8470.58 8400.00 16.13 N 1752.94 E 409.86 8996 8570.58 8500.00 17.52 S 1801.73 E 426.17 9122 8670.58 8600.00 56.99 S 1867.31 E 452.19 9258 8770.58 8700.00 104.79 S 1945.77 E 487.99 9411 8870.58 8800.00 165.06 S 2043.96 E 540.91 9.24 16.31 26.03 35.80 52.92 9621 8970.58 8900.00 253.42 S 2205.51 E 651.01 9658 8983.30 8912.72 268.92 S 2236.33 E 675.05 110.10 24.04 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS WELL LOG TRANSMITTAL To: October 2, 1995 State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs G-30A, AK-MW-50059, AK-MM-950730 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling SerVices, 5631 Silverado Way, #G, Anchorage, AK 99518 ** This is a re-distribution for wrong AP1 number. G-30A: 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-21613-01 1 Blueline 1 Rev Folded Sepia 2" x 5" TVD Resistivity and Gamma Ray Logs: 50-029-21613-01 1 Blueline 1 Rev Folded Sepia 2" x 5" MD Neutron Logs: 50-029-21613-01 1 Blueline 1 Rev Folded Sepia 2" x 5" TVD Neutron Logs: ~.¢ ~9 ~} 50-029-21613-01 %~;,c ~3;~Ou~ 1 Blueline ]~,~/':~ 1 Rev Folded Sepia ~/)~. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 8 August 1995 RE: Transmittal of Data Sent by: ANCH.EXPRESS Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION i PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 GR/CCL FINAL BL+RF 1 PLS/STP FINAL BL+RF ECC No. Run # 1 4050.03 Run # 1 4892.04 Run # 1 Run # 1 6463.01 Please sign and return to: Attn. Rodney D. Paulson Received by: ///~---~_ ___j~ / ~ ~~/'~ Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Reference: BP G-30A PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE + LIS Date: RE: 25 July 1995 Transmittal of Data ECC #: 6463.00 Sent by: PRIORITY MAIL Data: OH-LDWG Run # 1 Please sign and return to: Attn. Rodney D. Paulson = ~erv~ces ~..~0 B_~treet ~ Sui~e 201 / Anchorage, AK 99518 b~' ~~/~FAX to (907) 563-7803 Received , ~=..~>~--/ Date: RECEIVED LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE Date: RE: 24 July 1995 Transmittal of Data ECC #: 6463.00 ANCHORAGE Sent by: PRIORITY MAIL AK, 99501. Data: OH-LDWG Dear Sir/Madam, Reference: PRUDHOE BAY ~' NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 DLL/GR FINAL BL+RF Run # 1 1 ZDL/CN/GR FNL BL+RF Run # 1 1 CN/GR FINAL BL+RF Run # 1 1 BH PFILE FINAL BL+RF Run # 1 Please sign and return to: Attn. Rodney D. I Paulson ~-~ Atlas Wireline Services ~-~ Anchorage, AK 9951~ Received by: Anchorage EXPLORATION ! ~P Exploration (Alaska) Inc. PO Box 196612 AnChorage, Alaska 9951'9-{~612 TELECOPY COMMUNICATIONS CENTER MESSA'GE# TO: Name: ~. ~.. 'Company: Location: Fax # Confirm # FROM: Name & Ext,: Department; Mail Stop: /"77t~' /Z- ,jr "' I ' -"~' I~ ' ' ~., / ' ' " i- PAGES TO FOLLOW ~ (Do Not Ino.ude Cover Sheet) RECEIVED JUL 19.o5 .__ AI~,~I/~ /.I 9_ ~,-,~.~j.~--- ~_ · . SECURITY CLASSIFICATION A.qch~r: , PRIVATE SECRET CONFIDENTIAL IFor Communioation$ Center Use Only Time In Time Sent ...... ii-' __- ..... Time Confirmed- Confirmed By ...... Telecopy # Confirm # G-30A Supplement Doyon #14 ~/~ 7/14/g`5 The 7" liner procedure for cementing went a~ording to plah up until the casing test procedure where an attempt to pressure up to 3`500 psi was made. A pressure of 3600 psi was reached and the pressure bled off to t 100 psi, A 9 5/8" RTTS with a set of ?" seals was run in the hole and the 7" seals were stung into the PBR on top of the 7 X 9,5/8" liner top packer. A pressure of 8,500 psi was held on the annulus, but the 7" liner would not test, The 9 5/8" RTT$ and 7" seals were POOH and a 7" R'I-rS was run to isolate the leak in the 7" liner. There was some problem with tight hole at 6470' (7" liner hanger) and the RTTS had to be worked through, The packer was set at 6479' (4' in the first joint under the liner hanger) and the 7" liner tested to 3000 psi. The annulus was then tested and a rate of 3 BPM @2000 psi was observed. The 7" RTTS was POOH and a 9 5/8" EZSV was run and set at 6400'. A volume of 31 Bbls of Neat Class "G" cement was squeezed away with a final pressure of 1100 psi, The cement was displaced to just below the EZSV, After unstinging and reversing out the EZSV was stung into again after several hours and a pressure test was made up to 2000 psi, The pressure held and did not bleed off, Once the casing was cleaned out another pressure test was performed to 2`500 psi which slowly bled off to 1800 psi. The well was then cleaned out to the landing collar at 9788', Presently we are preparing to drill the production interval withe 6" bit, 1, Ddil ahead with a 6" bit through the production interval to +11826', run and cement 4 1/2" production liner in place, 2,, Cleanout 4 1/2," production liner, PU c) 8/4" perforating guns and perforate designated intervals, eleanout 4 1/2" liner, run 4 1/2" permenant packer with "XN" nipple. 3. PU and run 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 the following production assembly: 1/2" WLEG 1/2",9.3#, L-80, NSCT 10' tubing pup joint I/2" "X" nipple 1/2",9.3#, L-80,NSCT 10' perforated tubing pup joint 1/2",9.3#, L-80, NSCT 10' tubing pup joint 1/2" FB-1 permenant packer 1/2",9.3#, L-80, NSCT 10.= tubing pup joint 1/2" "X" nipple 1/2",9.3#, L-80, NSCT tubing 1/2~ X 9 5/8" SB3A packer 1/2",9.3#, L-80,N$CT tubing joint 1/2"X1 1i2" GLM 1/2",9.3#, L-80, N$CT tubing 1/2"X1 1/2" GLM (4294' MD,4200' TVD) 1/2",9,3#, L-80, N$CT tubing 1/2" SSSV 1/2",9,3#, L-80, NSCT tubing JUL I 4 !995 ~J~ & Gas Cons, JUL 14 '95 ~:i~PH S~RE.D SERVICES DRILL!Hg TFIB"~; 4 !/8" CIW WI=LLHI=AD: MCEVd¥ A~TUATOF: 4 1/~" OTIS G-30A ~id~tr~ek out o~ 9 5/8" Cesing KB, ELEV=6U.TB (0£)¥[)N 14) i~ ~/~" 72 ~.-80, RuT'r OTIS BSBV ~nuing Nipple ~ZOO' 9 ~t8" X ;31/2' SABL I~,~ker OAMO0 l l/~ LIFT M^NDREI.~i NO MD(BKBt ~ '/b~ 4L:~4. Window from 6646' 7~ Y, 0 618' 1.80 BUTT 4 lf3" 5 1/2", 17#/ff L.~0, I~ DATE 1-213 !~hang~r TOp Of PBR ~i (~1~6' e~r Unmr Hang~r qe 6470" Ttming 1/2', g.a#, L-B0 3 1i2' OTIS 2,75" I.D. BAKER ~, l/a",8,,3#,L-l~0 PerfOmte~l Pup F$'1 :3 1!3~ OTIS "X' N~PlO 2.7~" I.D. Gl~ding ?" P~nn Packer 4 qtP" X 7' net Hgr/P~r :~9,7~' Perlo~'atior~ 8~lrtlnlary & 1t2", 12.0# RECEIVED ' JUL ] 4 995 At~sk~ L)~i & Gas Cons. Commission Anchor: ' r ' PRUDI-IOE I~AY UNIT WELL: C.~1 (1~-11-14} A~I NO ,~1-02~.2177§ 6E~ I1~; TIIN;R14,C uP E~pl~tian [A~e~ MEMORANDUM TO: David John..~(;~,~ Chairm~n~ State of Alaska Alaska Oil and Gas Conservation Commission DATE: June 27, 1995 THRU: Blair Wondzeil, ~'~ FILE NO: P. I. Supervisor .0st. Petroleum Inspector AHGIFlCD:doc BOPE Test- Doyon 14 BPX - PBU - G-30A PTD # 95-0076 Prudhoe Bay Field Tuesday, June 27, 1995: I traveled this date to BPX's PBU well G-30A being drilled by Doyon rig 14 and witnessed the initial BOPE test. As the attached AOGCC BOPE Test Report shows there was 1failure. The ball type floor safety valve leaked. The valve was replaced and tested before I departed the location. The location was clean and all excess equipment was stored properly and there was good access to all areas of the rig. The rig was clean and all equipment seemed to be in good working order. Summary:. ! witnessed the BOPE test on Doyon rig 14 - test time - 3 hours - 1 failure. Attachment:' AHGIFICD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: 9.625" Test: Initial X Workover: DOYON Rig No. 14 PTD # 95-0076 BPX Rep.: G-30A Rig Rep.: Set @ 6850' PBD Location: Sec. ~ Weekly Other DATE: Rig Ph.# DINK HElM 6/27/95 659-4608 MARK "LA TCH" EGHOLM 12 T. 11N R. 13E Meridian UMIAT MISC. INSPECTIONS: Location Gen.: OK Housekeeping' OK (Gen) PTD # posted OK Standing Orders Posted-OK Well Sign OK Drl. Rig OK Test BOP STACK: Annular Preventer Pipe Rams Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve LOW. Quan. Pressure P/F 1 500~5000 P I 500~5000 P 500~5000 f 500~5000 P 1 500~5000 P 2 500~5000 P I 500~5000 P NVI N~ N~ FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes ACCUMULATOR SYSTEM: System Pressure Pressure After Closure Quan. Test Pressure P/F 500/5000 P 500/5000 500~5000 P F/P 500~5000 P Te~ Pressure P/F 14 500~5000 P 38 500~5000 P CYCLED CYCLED P P 3,000 I P 1,550 P MUD SYSTEM: Visual Alarm 200 psi Attained After Closure 0 0 minutes 37 sec. Trip Tank P P System Pressure Attained 2 minutes 50 sec. Pit Level Indicators P P Blind Switch Covers: Master: OK Remote: OK Flow Indicator P P Nitgn. Btl's: 4 ~ 2000 Methane dectors P P Psig. H2S dectors P Number of Failures: 1 ,Test Time: 3.00 Hours. Number of valves tested 24 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 i REMARKS: Failure: The ball type safety valve leaked- was changed out and tested before I departed the location. Distribution: ofig-Well File c - Oper./Rig c - Database c - Tdp Rpt File c -Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: BOBBY D. FOSTER FI4:)21L (Rev. 2/93) AHGIF1CD.XLS / / GAS . CONSERVATION CO SSION / TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 June 7, 1995 Terry Jordan Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit G-30A BP Exploration (Alaska), Inc. Permit No. 95-76 Sur. Loc. 2519'SNL, 2369'WEL, Sec. 12, TllN, R13E, UM Btmnhole Loc. 2520'SNL, 3080'WEL, Sec. 7, TllN, R14E, UM Dear Mr. Jordan: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. BY dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] RedrilllTIIlb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 69. 78' f e et Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 28304 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 2519' SNL, 2369' WEL, SEC. 12, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2774' SNL, 183' WEL, SEC. 12, T11N, R13E G-30A (22-7-11-14) 2S100302630-277 At total depth 9. Approximate spud date Amount 2520' SNL, 3080' WEL, SEC. 7, T11N, R14E 6/21/95 $200,000.00 12.propertyDistancelinetO nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD) ADL 28280-1835' feet No close approach feet 2560 11967' MD/8941' TVD feet 16. To be completed for deviated wells 7. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 6600 feet Maximum hole angle 9¢.3 o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Specifications Setting Depth size Top Bottom Quantity of cement Hol~c si g W ightlGradelCoup, gLength MD TVD MD TVD (include stage data) I I ,% ;%: 6" 4-1/2" NSCT 9594' 9000' 11967' 8941' 255 sx Class "G" !995 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary AjBSt~3. 0il & Gas Cons. Commission Total depth: measured 9815 feet Plugs (measured) Anchorr,"~ true vertical 9135 feet Effective depth: measured 9726 feet Junk (measured) Fi//@ 9726'MD (6/89) true vertical 9054 feet Casing Length Size Cemented Measured depth True Vedical depth Structural Conductor 110' 20" 9 cu yd 143' 143' S u r f a c e 2651' 13-3/8" 3718 cu ft 2684' 2684' I n t e r m e d i at e 89 76' 9-5/8" 575 cu ft 9009' 8392' Production Liner 1039' 7" 385 cuft 8776'-9815' 8175'-9135' Perforation depth: measured 9618'-96828', 9642'-9718' true vertical 8884'-8975' (two intervals - subsea) '.20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] iDrilling fluid program [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirementsF-I i21. I hereby certify that,.the fp, regoing is true and correct to the best of my knowledge Signed ?U/J/ ~ ~~ Title Drilling Engineer Supervisor Date <~"/'i' ~ ~' Commission Use Only iPermit Number IAPI number Approval date See cover letter i ?,5'-?,¢' 15 o- o z.¢ .... ~/6/..~ -' <:~ / for other requ rements iConditions of approval Samples required [] Yes [] No Mud Icg required [] Yes ~ No {Hydrogen sulfide measures [] Yes [] No Directional survey required ~ Yes [] No ~ Required working pressure for BOPE r"12M; I-q3M; [~SM; i--I10M; []15M; Other: d'r',gmal Signed By by order of /__ [ Oavid W, Johnston (~,/-?//~_~.~ !Approved by Commissioner tne commission Date Form 10-401 Rev. 12-1-85 Submit ih/ ti'~'plicat( i Well Name: I G-30A Redrill Plan Summary IType of Redrill (producer or iniector): PRODUCER Surface 2519-FNL & 2369 FEL, Sec. 12, T11N/R13E Location: Tar~let Location: 2774 FNL & 183 FEL, Sec 12, T11N/R13E Bottom Hole 2520 FNL & 3080 FEL, Sec 7, T11N/R14E Location' AFE Number: TBD IRig: I DOYON RIG Cf14 Estimated Start 6/21/95 Date: IMD: 111967' ! Operating days to complete: 22 I TVD: 18941 IKBE: 169'78 I Well Design (conventional, slimhole, etc.): HORIZONTAL SIDETRACK I Objective: I SADLEROCHIT ABNORMAL PRESSURE Special design considerations NONE. NO ABNORMAL PRESSURE ANTICIPATED. RESERVOIR PRESSURE HIGHLY CONSISTENT IN "G" PAD AREA AT 2500 PSI RECEIVED MAY 1 9 1995 Alaska 0il & Gas Cons. Commission Anch0rr, ,, G-30A Redrill Plan Summary Page 1 Mud Program: An 10.0-10.2 ppg mud will be used for the 8 1/2" intermediate hole and 9.0 ppg will be used on the 6" production hole. Special design hE)NE considerations Depth Densi PV YP INT 10MIN FL OIL SOLID (TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S (PPG) ) min (%) KOP' 10.0 10 15 5 10 5 0 5 to to to to to to to to to 9477 10.1 18 30 15 · 30 7 0 10 Depth Densi PV YP INT 10MIN FL OIL SOLID (TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S (PPG) ) min (%) 947'7 9.0 10 45 5 10 5 0 5 to to to to to to to to to 11967 9.1 15 50 15 30 7 0 10 Directional: I KOP: 16600 Maximum Hole Angle: Close Approach Well: 91.3° The above listed wells will be secured during the close approach. Casing/Tubing Program: Hole Csg/ Wt/Ft -Grade Conn Length Top Btm Size Tbs O.D... MD/TVD MD/TVD 8.5" 7" 29.0 L-80 nscc 3294' 6450/6110 9744/9021 6" 4 1/2" 12.6 L-80 nsct 2373 9594/9000 11967/8941 i'% L_ ,~,..~ I,,., a - ,..- ,MAY 19 1)95 Ai[~~, Anchor;," G-30A Redrill Plan Summary Page 2 Cement Calculations: Basis: Liner Size: 7" 29#, L-80,NSCC 50% open hole excess, 80' shoe joint, 150' liner lap (9 5/8"), and 200' excess above liner top. Total Cement 120.5 579sxs of Class G Blend @ 1.17 ft3/sx Volume: Bbls 4 1/2", 12.6#, L-80, NSCT Liner Size: I Basis: I excess above liner top. Volume: B 50% open hole excess, 80' shoe joint, 150' liner lap and 200' 255 Sx of Class "G" Blend @ 1.17 ft3/sx Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. Hazards and Contingencies Mud weights should be kept to a minimum while drilling through the horizontal section (+9.0 ppg) to prevent differential sticking. With 9.0 ppg the hydrostatic is +4250 psi which well over the formation pressure of +2500 psi. RECEIVED MAY 1 9 1995 Oil & Gas Cons. Commission Anchors,., G-30A Redrill Plan Summary Page 3 SUMMARY PROCEDURE 1. Pre-Rig Work: RU slickline. RIH and ensure the sliding sleeve at 9598' is open, if sleeve is inoperable then perofrate 4 squeeze holes at 9597'.RU cementers and tie directly into tree down the production tubing, mix and pump 20 bbls of Class "G" and displace with 137 bbls of seawater (top of cement @ _+9000'), POOH, RU wireline, RIH with jet cutter and tag top of cement with AOGCC representative present (top of cement must be above 9500'), then jet cut 4 1/2" production tubing at +8698' 2. Move in drilling rig. 3. Puli BPV. Circulate diesel freeze protection cap from well and recover for future use. 4. Install a TWC valve. Remove the production tree. 5. Install BOP's and test to 5000 psi. Remove the TWC valve. 6. Pull and lay down the 4 1/2", 12.6#, L-80, BUTT tubing, RU wireline, RIH ~vith EZSV for 9 5/8" casing and set retainer at 6850'. PU 9 5/8" section mill, RIH to 6850', spot heavy mud to 6650', pull section mill to 6600'. Displace well to FLO-PRO/milling fluid. Cut a 50' section in the 9 5/8" casing starting from about 6600'-6645'MD. POOH 9. RIH with open ended drill pipe to 6750' and lay a cement plug back to 6400', POOH. 10. Run in with a 6 3/4" steerable drilling assembly and a 8 1/2" bit with gamma ray/directional MWD. Contact AOGCC to witness tag of cement for abandonment purposes. Dress the cement to 5' below the section top. Kickoff and if necessary displace well to clean FLO-PRO system. Continue to directionally drill to the 7" casing point at _+9744' at 89.5° (see attached directional plan). 1 1. Make a conditioning trip with-an 8 1/2" hole-opener for the open hole section Install a 7", 29#, L-80, STL Solid liner with 7" X 9-5/8" packer/hanger. Packer / hanger to be set at _+645O' MD. 12. Cement the liner in place with the total cement volume based upon 50 % open-hole enlargement plus the 80' shoe volume, 9-5/8 X 7" lap volume, and 150' excess on top of the liner with drillpipe in the hole. 13. Re-test BOP's as needed. 14. PU 3 1/2" drill pipe and 4 3/4" steerable drilling assembly with game ray and directional MWD. RIH and cleanout liner to landing collar, test casing to 3500 psi. 15. Drill out shoe and continue to drill horizontally to 11967' MDTD. 16. Install a 4 1/2",12.6#,L-80,NSCT solid liner with 4 1/2" X 7" hanger/packer. The liner hanger is to be at +9594'. 17. Cement the liner in place with the total cement volume based upon 50% open-hole enlargement plus the 80' shoe volume, 4 1/2"X7" lap volume and 150' excess on top of the liner with 3 1/2" drill pipe in the hole. Clean out cement to landing collar. RIH with drillpipe conveyed perforating assembly and perforate the well. POOH LDDP. Run the 3-1/2" L-80 completion string assembly using as much 3-1/2" used tubing and jewelry as possible. Space out and circulate with corrosion inhibitor. Install a BPV and test plug. Remove BOP's. Install and test the production tree to 5000 psi. Pull tree test plug and BPV. Set packer. Test the tubing x casing annulus to 3500 psi for 30 minutes. Shear RP valve in the upper GLM and freeze protect the well. Set aBPV. Release rig. RECEIVED Complete appropriate documentation and hand-over to Production. , 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. MAY 1 9 1995 A!ask~ 0il & Gas Cons. Commission Anch0r~,. G-30A Redrili Plan Summary Page 4 ,~k'oped Semvic~s Dr~illin~. ~ska S~c0.-~e Plane: Zone4 ~m'~o' : WwA. G-Pad WELLPLAN FEAZ]EJL]TY STUDY ONLY~ ~Y ~F: ~LL~AD PR'B~D 'D-IL TVD MD 1 ~ '~o7.09 5/10/g5 10~1 on - VS 42'05.03 r~S 0.64 $ E/W 42'03.03 E  , : ~ . i SCALE 250 f'-t. / D]V],SID'4 . i' 7VD .k-'EF: V:ZLLHEAD VERTIC,,N_ SECTIDN R:~'ZF: VELLh.EAD I 5'IA-~T EF I 12J~V[ i; F:~ i; I ii~S~,.----~'\ 3127 e ~ ~D ~m~ / nE IN / S~A~T D- CUW[ i j k~,L:~.97 8 6703 HD ~o.m/,,oo SI~T ET 55.33...--, Slt.~T i::F .CI0 ~ 6~1 END Or O,.R~ o. 7201 .MD END BF CLK:'VE 1690 VERTICAL VIEW f LmYUC~ P"~.~N~ ~T$ 1 J 11 4500 4750 -TOD ._2' · I AZL TVD hVS ~ '31.~7 B8.19 ~ 134 N }533 6951 ;SCI) IE:5,00 65,~8 I:10 N 1663 780~ COO IE'SDO 680~ 91 N }6.c0 8842 aC0 125C0 8~50 QI N 1600 974,4 g~.'50 IL;:~,00g0~l ~ S ~'lF~. 10'944 93.50 ~/.O0 .colo ,4G~ S ~ ~,J387~0~1~ 6~L'~3 ~ ~ S 37!7 6~35 8065 E~7 S 37~ { 9o,'cpI h~,-¢,TVD h.5.. Ev E~,d X 6,'",d Y 0.03 ii 8842 ~B START EF CL.~,~ ~ 10.03/IC~¢'(', .OC) ~ 9t42 I,':D 0.18 e ~J42 I'4'D ,.._. .7_,...2, 533 ! 750 203O E250 ~ 2759 3OOO V:Z_RT]CAL S£CT]Dt P.A%E: 93.01 I k'o?: LL~o mD, 4.~7 'rv.D t~DTk) : //9(.7 ~D ) ~?dl d~' ,..,.~ ¢ x¥¢* ..,¢ ._..''4~~" , 89.5o 5000 RECEIVED MAY 1 9 199,,5 Alaska Oil & Gas Cons. Commission Anchorr, STATE OF ALASKA .... " ALAS~-~ OIL AND GAS CONSERVATION COMMISSIC APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon x Suspend __ Operation Shutdown ~ Re-enter suspended well __ Alter casing ~ Repair well , , Plugging x Time extension__ Stimulate__ Change approved program __ Pull tubing Variance ~ Perforate ~ Other X __ Plugback for redrill 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory __ Stratigraphic __ Service 4. Location of well at surface 2519' SNL, 2369' WEL, SEC. 12, T11N, R13E, UPM 24441SNL, 287' EWL, SEO. O7, T11N, R14E,UPM ~ ' At effective depth g~6 ~ V}-:;-t ~' At total depth ~ IN~L--~ '~(~"1~5 , 2493' SNL, 535' EWL, SEC. 07, T11N, R14E, UPM ~' ~ - ~-'3 ~nmml~lO~ 12. Present well condition summaF &~S~ ~-~ ~u,, ........... Total depth: measured 9815 feet~C~T~ (measured) true vedical BKB 9135 feet Effective depth: measured 9726 feet Junk (measured) true vertical BKB 9054 feet Casing Length Size' Structural -- Conductor 110 20 Surface 2651 13 3/8 Intermediate 8976 9 5/8 Production -- Liner 1039 7 Perforation depth: measured 9618'-9628', 9642'-9718' Cemented 9 c.y. 3718 c.f. 575 c.f 6. Datum elevation (DF or KB) KBE=72.23 AMSL feet true vertical subsea 8884'~8975' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9634' 7. Unit or Property name Prudhoe Bay Unit 8. Well number G-30 (12~07-44-14) PBU 9. Permit number 86-118 10. APl number 50- 029-21613 11. Field/Pool Prudhoe Oil Pool FILL A T 9726' MD (06/89) Measured depth. 143 2684 9009 True vedicaldepth BKB 143 2684 8392 385 c.f. 8776-9815 8175-9135 Packers and SSSV (type and measured depth) 7" TIW HBBP PKR @ 9623'; 9-5/8" BAKER HB PKR @ 8723'; 4-1/2" SSSV @ 2106' 13. Attachments Description summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation 5/3O/95 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Service Gas Suspended __ 17., hereby certify that t?f~~e~~d correct to the best of my knowledge. Signed Title Drilling Engineer Supervisor FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- Approved by order of the Commission Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE WELL PERMIT CHECKLIST WELL NAME GEOL AREA UNIT# PROGRAM: exp [] der [] redrll~ serv [] ON OFFS O ADMINISTRATION ENGINEERING APPR DATE GEOLOGY 1. Permit fee attached .................. N 2. Lease number appropriate ............... N 3. Unique well name and number .............. N 4. Well located in a defined pool ............. N 5. Well located proper distance from drlg unit boundary.. N 6. Well located proper distance from other wells, i i ! i N ' 7. Sufficient acreage available in drilling unit. N 8. If deviated, is wellbore plat included .... N 9. Operator only affected party .............. N 10. Operator has appropriate bond in force ......... N 11. Permit can be issued without conservation order .... N 12. Permit can be issued without administrative approval.. N wait. N 13. Can permit be approved before 15-day ...... 14. Conductor string provided ................ Y N 15. Surface casing protects all known USDWs ......... Y N 16. CMT vol adequate to circulate on conductor & surf csg.. Y N 17. CMT vol adequate to tie-in long string to surf csg . . . Y N 18. CMT will cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............. N 21. If.~.:~$-drill, has a 10-403 for abndnmnt been approved. N 22.'"Adequate wellbore separation proposed .......... ~ N 23. If diverter required, is it adequate ........... 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate ..................... ~ N 26. BOPE press rating adequate; test to'->6;~ psig.~ N 27. Choke manifold complies w/API RP-53 (May 84) ...... 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............ ~ N / 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones .. .... Y/~ 32. Seismic analysis 9f shallow gas zones .......... Y/ N 33. Seabed condition survey (if off-shore) ......... / N 34. Contact name/phone for weekly progress reports .... /Y N . [exploratory only] ~ , GEOLOGY: ENGINEERING: COMMISSION: DWJ ~ Comments/Instructions: A:tFORMS%cheklist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organiZe this category of information. TaPe SUbfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 6572.00 T. MCGUIRE C. DIXON G-30A 500292161301 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 29-JAN-96 MWD RUN 5 T. MCGUIRE W. HELMS MWD RUN 6 HENNINGSEN D. WESTER JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 7 HENNINGSEN D. WESTER MWD RUN 8 HENNINGSEN D. WESTER MWD RUN 9 T. MCGUIRE D. HIEM MWD RUN 10 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD T. MCGUIRE D. HIEM MWD RUN 11 T. MCGUIRE D. HIEM 12 lin 13E 2519 2369 70.58 69.08 34.93 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2705.0 2ND STRING 9.625 6590.0 3RD STRING 8.500 7.000 9823.0 PRODUCTION STRING 6.000 11789.0 REMARKS: MWD - DGR/EWR4/CNP. ALL DEPTHS ARE MEASURED BIT DEPTHS. AV/CV CALCULATED USING THE POWER RULE. MWD RUNS 1 - 3 WERE DWD DIRECTIONAL ONLY. DATA FROM 7450' - 7740' MD IS MEASURED AFTER DRILLING (MAD) & IS PART OF MAIN (MWD) PRESENTATION. MWD RUNS 4 & 5 WERE DGWD DIRECTIONAL WITH RECORDED DUAL GAMMA RAY AND COMPENSATED NEUTRON POROSITY. MWD RUNS 6 - 8 WERE MPT DIRECTIONAL WITH REALTIME DUAL GAMMA RAY AND COMPENSATED NEUTRON POROSITY. MWD RUNS 9 - 11 WERE DGWD DIRECTIONAL WITH RECORDED DUAL GAMMA RAY & SLIM PHASE 4 RESISTIVITY. LOGGED GAMMA RAY COMBINED (SGRC) IN CASING FROM 9784 9823' MD. DGWD GAMMA RAY (NGP/SGRD) DATA WAS USED FROM 11711 - 11740' MD. THERE ARE 3 MAD PASSES FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 7454.0 RP 9669.0 NPHI 7447.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA all bit runs merged. STOP DEPTH 11738.0 11716.0 9778.0 open hole GR from WALS, (MEASURED DEPTH) BASELINE DEPTH GR 9272.0 9266.0 9290.0 9289.5 9295.5 9293.5 9354.0 9350.0 9485.0 9483.5 9487.5 9486.0 9525.0 9523.5 9527.5 9526.0 9546.5 9544.0 9555.5 9553.5 9560.5 9559.0 9564.0 9561.5 9615.0 9612.0 9649.5 9646.5 9650.5 9648.0 9668.5 9663.5 9671.0 9666.5 9671.5 9667.5 9698.5 9695.5 9699.5 9696.5 9702.0 9698.5 9716.5 9712.5 9719.5 9715.0 9731.5 9727.5 9732.5 9729.5 9735.5 9730.5 9738.0 9733.5 9741.5 9737.5 9744.0 9741.0 9825.5 9827.0 10025.5 10031.5 10027.5 10033.5 10033.5 10034.5 10036.0 10035.5 10090.5 10091.0 10116.5 10118.0 10467.5 10470.0 10473.0 10475.0 10476.5 10479.0 10590.5 10594.0 10595.0 10597.5 10606.0 10608.5 21-JUL-95. EQUIVALENT UNSHIFTED DEPTH 10608.5 10611.0 10613.5 10657.0 10661.5 10706.0 10720.0 10721.5 10724.0 10728.0 10758.0 10760.0 10781.5 10784.5 10787.5 11100.0 11254.5 11259.0 11294.0 11296.5 11299.5 11358.5 11579.0 11616.5 $ MERGED PBU MWD MWD MWD MWD MWD MWD MWD MWD $ REMARKS: DATA SOURCE TOOL CODE 10610.0 10611.0 10613.0 10658.5 10663.0 10702.0 10717.0 10720.5 10724.5 10731.0 10758.5 10759.5 10787.0 10789.5 10793.0 11103.0 11264.0 11268.0 11295.5 11298.0 11301.0 11359.5 11580.0 11618.5 BIT RUN NO MERGE TOP MERGE BASE 4 8496.0 9125.0 5 9125.0 9214.0 6 9214.0 9328.0 7 9328.0 9638.0 8 9638.0 9824.0 9 9824.0 10507.0 10 10507.0 10909.0 11 10909.0 11789.0 MERGED MAIN PASS. ALL CURVES WERE SHIFTED WITH GR. DATA FROM 7450 - 7740' MD WAS MEASURED AFTER DRILLING (MAD). / ? ? SHI FT. OUT $ CN : BP EXPLORATION WN : G-30A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 10 Curves: (ALASKA) Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 NPHI MWD 68 1 PU-S 4 7 FCNT MWD 68 1 CPS 4 8 NCNT MWD 68 1 CPS 4 9 FET MWD 68 1 HR 4 10 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 890 01 1 4 90 334 31 1 4 90 334 30 1 4 90 180 01 1 4 90 810 01 1 40 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 461 Tape File Start Depth = 11795.000000 Tape File End Depth = 6498.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 116546 datums Tape Subfile: 2 638 records... Minimum record length: Maximum record length: 62 bytes 1018 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: CN WN FN COUN STAT START DEPTH 10479.0 10484.0 STOP DEPTH 10758.0 10765.0 MAD RUN NO. MAD PASS NO. MERGE TOP 11 1 10479.0 11 2 10548.0 11 3 10718.0 MERGE BASE 10518.0 10598.0 10758.0 MERGED MAD PASSES. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 4 2 RPX MAD 68 1 OHMM 4 3 RPS MAD 68 1 OHMM 4 4 RPM MAD 68 1 OHMM 4 5 RPD MAD 68 1 OHMM 4 6 FET MAD 68 1 HR 4 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 17 Tape File Start Depth = 10770.000000 Tape File End Depth = 10470.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4208 datums Tape Subfile: 3 43 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 7452.0 CNP 7445.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9046.0 9038.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 0S-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 MEMORY 9125.0 8496.0 9125.0 0 2.1 38.1 TOOL NUMBER PO382CRNG6 PO382CRNG6 8.500 6590.0 BIOPOLY 10.10 79.0 9.6 74000 .0 .00'0 .000 .000 .000 .0 146.0 .0 .0 SANDSTONE .00 8.500 .0 .0 REMARKS: CN WN FN COUN STAT MWD RUN 4. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 FCNT MWD 68 1 CPS 4 4 NCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 890 01 1 4 90 334 31 1 4 90 334 30 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 81 Tape File Start Depth = 9130.000000 Tape File End Depth = 7440.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 136833 datums Tape Subfile: 4 146 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9034.0 CNP 9027.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUMANGLE: STOP DEPTH 9155.0 9148.0 06-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 MEMORY 9214.0 9125.0 9214.0 0 66.3 78.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR GUAL GAMMA RAY $ TOOL NUMBER PO376CRNG6 PO376CRNG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 8.500 6590.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: BIOPOLY 9.80 69.0 9.0 10075 4.0 .000 .000 .000 .000 .0 147.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE .00 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 5. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ TIP Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 FCNT MWD 68 1 CPS 4 4 NCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 890 01 1 4 90 334 31 1 4 90 334 30 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 9220.000000 Tape File End Depth = 9020.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6615 datums Tape Subfile: 5 75 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9153.0 CNP 9145.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9270.0 9262.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR GUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 07-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 REAL-TIME 9382.0 9214.0 9382.0 0 43.1 45.8 TOOL NUMBER PO382CRNG6 PO382CRNG6 8.500 6590.0 BIOPOLY 9.90 81.0 8.8 52100 4.4 .000 .000 .000 .000 .0 147.0 .0 .0 SANDSTONE .00 8.500 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 6. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 FCNT MWD 68 1 CPS 4 4 NCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 890 01 1 4 90 334 31 1 4 90 334 30 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 9330.000000 Tape File End Depth = 9140.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 139120 datums Tape Subfile: 6 75 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9263.0 CNP 9255.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9599.0 9591.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR GUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 08-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 REAL-TIME 9638.0 9328.0 9638.0 0 48.8 69.6 TOOL NUMBER PO382CRNG6 PO382CRNG6 8.500 6590.0 BIOPOLY 10.00 74.0 8.2 47800 4.4 .000 .000 .000 .000 .0 145.0 .0 .0 SANDSTONE .00 8.500 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 7. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length TIp TIp Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 FCNT MWD 68 1 CPS 4 4 NCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 890 01 1 4 90 334 31 1 4 90 334 30 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 19 Tape File Start Depth = 9645.000000 Tape File End Depth = 9250.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 11362 datums Tape Subfile: 7 84 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9598.0 CNP 9591.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9784.0 9777.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR GUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 09-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 REAL-TIME 9824.0 9638.0 9824.0 0 69.9 78.0 TOOL NUMBER PO382CRNG6 PO382CRNG6 8.500 6590.0 BIOPOLY 9.90 74.0 8.1 42100 4.6 .000 .000 .000 .000 .0 143.0 .0 .0 SANDSTONE .00 8.500 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 8. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 FCNT MWD 68 1 CPS 4 4 NCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 890 01 1 4 90 334 31 1 4 90 334 30 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 12 Tape File Start Depth = 9830.000000 Tape File End Depth = 9585.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 142067 datums Tape Subfile: 8 77 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9658.0 EWR4 9664.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10424.0 10431.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 15-JUL- 95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 MEMORY 10507.0 9824.0 10507.0 0 85.3 92.0 TOOL NUMBER PO SP4 PO SP4 6.000 9823.0 FLOPRO 9.00 75.0 9.4 32340 6.1 .ilo .062 .090 .140 92.0 168.0 92.0 92.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 9. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 56 Tape File Start Depth = 10511.000000 Tape File End Depth = 9650.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 25147 datums Tape Subfile: 9 121 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 10418.0 EWR4 10417.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10827.0 10834.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 17-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 MEMORY 10909.0 10507.0 10909.0 0 88.7 97.3 TOOL 'NUMBER PO SP4 PO SP4 6.000 9823.0 FLOPRO 9.00 79.0 9.2 36358 4.9 .120 .064 .090 .160 87.0 169.0 87.0 87.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 10. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length TIP TIP Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 33 Tape File Start Depth = 10915.000000 Tape File End Depth = 10410.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 10 150156 datums 98 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 P_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 10820.0 EWR4 10798.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11740.0 11718.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 19-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 MEMORY 11789.0 10909.0 11789.0 0 89.4 96.7 TOOL NUMBER PO SP4 PO SP4 6.000 9823.0 FLOPRO 9.10 73.0 9.8 39000 5.0 .140 .071 .120 .160 88.0 179.0 88.0 88.0 .00 .000 .0 0 REMARKS: CN WN FN COLIN STAT MWD RUN 11. $ : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ TIP Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 65 Tape File Start Depth = 11791.000000 Tape File End Depth = 10795.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 41092 datums Tape Subfile: 11 130 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 12 is type: LIS FILE HEADER FILE NUMBER: 11 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 11 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 10479.0 EWR4 10484.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10518.0 10525.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 19-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 MEMORY 11789.0 10479.0 10525.0 0 89.4 96.7 TOOL NUMBER PO SP4 PO SP4 6.000 9823.0 FLOPRO 9.10 73.0 9.8 39000 5.0 .140 .071 .120 .160 88.0 179.0 88.0 88.0 .00 .000 TOOL STANDOFF (IN) : . 0 EWR FREQUENCY (HZ) : REMARKS: MAD PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MAD 68 1 AAPI 2 RPX MAD 68 1 OHMM 3 RPS MAD 68 1 OHMM 4 RPM MAD 68 1 OHMM 5 RPD MAD 68 1 OHMM 6 FET MAD 68 1 HR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 95 310 01 1 4 95 120 46 1 4 95 120 46 1 4 95 120 46 1 4 95 120 46 1 4 95 180 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * 24 Total Data Records: Tape File Start Depth = 10530.000000 Tape File End Depth = 10475.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 150934 datums Tape Subfile: 12 70 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 13 is type: LIS FILE HEADER FILE NUMBER: 12 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 11 MAD PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 10548.0 EWR4 10555.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10598.0 10605.0 19-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 MEMORY 11789.0 10548.0 10605.0 0 89.4 96.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR ELECTROMAG. RESIS. 4 $ TOOL NUMBER PO SP4 PO SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9823.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLOPRO 9.10 73.0 9.8 39000 5.0 .140 .071 .120 .160 88.0 179.0 88.0 88.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : .0 EWR~ FREQUENCY (HZ) : REMARKS: MAD PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length TIP TIP Cls Mod 1 GR MAD 68 1 AAPI 4 2 RPX MAD 68 1 OHMM 4 3 RPS MAD 68 1 OHMM 4 4 RPM MAD 68 1 OHMM 4 5 RPD MAD 68 1 OHMM 4 6 FET MAD 68 1 HR 4 4 95 310 01 1 4 95 120 46 1 4 95 120 46 1 4 95 120 46 1 4 95 120 46 1 4 95 180 01 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10610.000000 Tape File End Depth = 10545.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 42010 datums Tape Subfile: 13 70 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 14 is type: LIS FILE HEADER FILE NUMBER: 13 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 11 MAD PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 10718.0 EWR4 10725.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10758.0 10765.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 19-JUL-95 MSC 1.32 / ISC 2.02 NGP 5.741/ CIM 3.94/ SP4 5.01 MEMORY 11789.0 10718.0 10765.0 0 89.4 96.7 TOOL NUMBER PO SP4 PO SP4 6.000 9823.0 FLOPRO 9.10 73.0 9.8 39000 5.0 .140 .071 .120 .160 88.0 179.0 88.0 88.0 .00 .000 TOOL STANDOFF (IN) : .0 EWR' FREQUENCY (HZ) : REMARKS: MAD PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 4 2 RPX MAD 68 1 OHMM 4 3 RPS MAD 68 1 OHMM 4 4 RPM MAD 68 1 OHMM 4 5 RPD MAD 68 1 OHMM 4 6 FET MAD 68 1 HR 4 4 95 310 01 1 4 95 120 46 1 4 95 120 46 1 4 95 120 46 1 4 95 120 46 1 4 95 180 01 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10770.000000 Tape File End Depth = 10715.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 151712 datums Tape Subfile: 14 70 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 15 is type: LIS 96/ 1/30 01 **** REEL TRAILER **** 96/ 1/31 01 Tape Subfile: 15 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 31 JAN 96 8:57a Elapsed execution time = 4.50 seconds. SYSTEM RETURN CODE = 0 ~~UDHOE BAY {5~i~q~ JUL 2...~ 1995 Anchora~t~ Run 1- 21 - July - 1995 DLL/ZDL/CN/GR Pipe Conveyed 9370 1728 IMESTERN ATLAS Logging Services · ~ape Subfile 2 is ty~ LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD G - 30A 500292161301 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 24-JUL-95 RUN 1 6463.00 K. RICHARDS SEE REMARKS RUN 2 RUN 3 12 liN 13E 2519 2369 70.58 0.00 34.93 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 7.000 9823.0 PRODUCTION STRING 6.000 11789.0 REMARKS: DLL/ZDL/CN/GR. LOGS WITNESSED BY: C. ZARNDT & E. RANDALL. CIRCULATION STOPPED AT 1630, 20-JUL-95. PIPE CONVEYED LOGGING OPERATION. MAXIMUM ANGLE 97.3 DEGREES AT 10857' MD. GAMMA INSTRUMENT WAS INTERMITTENT WHILE LOGGING. THE GAMMA RAY FROM TD - 11070 & FROM 10450 - 10800 WAS FROM THE MAIN UP PASS. 9944-10290 WAS FROM THE REPEAT PASS. 9250-9944 WAS FROM THE DOWN PASS (NO OTHER DATA FROM DOWN PASS IS PRESENTED). THERE ARE SECTIONS WHERE NO GAMMA RAY IS PRESENTED. THIS IS DUE TO NO VALID GAMMA RAY BEING AVAILABLE OVER THAT SECTION. THIS WAS DONE AT THE BP REPRESENTATIVE'S REQUEST. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER CORRECTED, CASING CORRECT. OFF (OPEN HOLE) CASING CORRECT. ON (CASED HOLE) SALINITY = )0 PPM. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; hole data. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9826.0 11703.0 DLL 9826.0 11728.0 SDN 9826.0 11724.0 2435 9826.0 11700.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH LLD 9875.5 9889.0 9898.5 9904.0 9910.0 9912.0 9912.5 9917.5 9937.5 9957.5 10028.0 10051.5 10060.0 10068.5 10072.5 10087.0 10086.5 10114.5 10180.5 10180.5 10189.0 10236.0 10412.0 10421.0 10443.0 10462.0 10467.5 10478.5 10489.0 10519.5 10534.0 10549.0 10570.0 10589.0 10589.0 10599.0 10601.0 10606.0 10619.5 10619.0 10623.5 10624.0 10629.5 10630.0 10632.5 10638.0 10638.0 10639.0 all runs merged; EQUIVALENT UNSHIFTED DEPTH RHOB NPHI 9876.0 9889.5 9899.5 9904.0 9910.5 9917.5 9937.0 9957.5 10028.0 10051.0 10059.5 10068.0 10073.0 10114.0 10188.5 10235.5 10411.5 10422.0 10443.0 10462.0 10467.5 10478.5 10489.0 10519.5 10534.0 10549.5 10548.0 10569.5 10599.0 10601.0 10606.5 10606.5 10620.0 10632.5 10640.0 no case 10666.5 10670.0 10672.0 10693.5 10694.5 10727.5 10738.0 10744.5 10749.0 10754.5 10755.0 10759.5 10765.0 10765.5 10781.5 10792.0 10816.5 10888.0 10892.0 10933.5 10966.5 11008.5 11040.5 11061.5 11090.5 11098.0 11104.5 11141.5 11162.0 11168.0 11171.5 11178.5 11193.5 11195.0 11216.0 11242.5 11244.5 11260.5 11267.0 11278.0 11285.0 11285.5 11295.0 11300.5 11354.0 11357.5 11358.0 11369.5 11382.5 11400.5 11408.5 11412.5 11478.0 11559.0 11563.5 11576.5 11580.0 11591.0 11608.5 11617.0 666.0 10693.0 10756.0 10766.5 11193.0 11244.0 11358.5 11400.5 11579.5 11608.5 10670.0 10672.0 10727.0 10749.5 10767.0 10782.5 10888.5 11167.5 11178.5 11216.0 11242.5 11260.5 11267.5 11278.5 11284.5 11357.5 11383.0 11412.5 11559.0 11563.5 11617.0 10694.5 10737.0 10744.5 10754.5 10759.5 10791.5 10816.5 10892.5 10933.5 10967.0 11009.0 11040.5 11061.0 11091.0 11099.5 11104.5 11142.0 11162.5 11168.5 11172.0 11178.5 11194.5 11243.0 11267.0 11286.0 11295.5 11301.0 11354.5 11370.5 11408.0 11478.0 11577.0 11591.5 11645.5 11652.5 $ MERGED DATA SOURCE PBU TOOL CODE GR DLL SDN 2435 $ REMARKS: 11646.0 11652.5 RUN NO. PASS NO. MERGE TOP 1 4 9826.0 1 4 9826.0 1 4 9826.0 1 4 9826.0 OPEN HOLE portion of MAIN PASS. MERGE BASE 11703.0 11728.0 11724.0 11700.0 DUE TO TOOL PROBLEMS, THE GR CURVE IS A COMPOSITE FROM SEVERAL DIFFERENT PASSES. LL3, MTEM, SP, TEND, & TENS WERE SHIFTED WITH LLD. DRHO, PEF, CALl, & RB1 WERE SHIFTED WITH RHOB. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH1. OUT /??MATCH2.OUT /??MATCH3.OUT $ : BP EXPLORATION (ALASKA) : G - 30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Name Tool Code Samples Units GR DLL 68 1 GAPI LLD DLL 68 1 OHMM LL3 DLL 68 1 OHMM SP DLL 68 1 MV MTEM DLL 68 1 DEGF TEND DLL 68 1 LB TENS DLL 68 1 LB RHOB SDN 68 1 G/C3 DRHO SDN 68 1 G/C3 PEF SDN 68 1 BN/E CALl SDN 68 1 IN RB1 SDN 68 1 DEG NPHI 2435 68 1 PU-S FUCT 2435 68 1 CPS NUCT 2435 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 17 310 01 1 4 17 995 99 1 4 17 995 99 1 4 17 995 99 1 4 17 995 99 1 4 17 995 99 1 4 17 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 43 995 99 1 4 43 995 99 1 4 43 995 99 1 * DATA RECORD (TYPE# 0) Total Data Records: 260 966 BYTES * Tape File Start Depth = 11775.000000 Tape File End Depth = 9826.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 62385 datums Tape Subfile: 2 472 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for PASS NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUSIMA_RY PBU TOOL CODE START DEPTH GRCH 9372.0 2435 9408.0 SDN 9372.0 $ BASELINE CI/RVE FOR SHIFTS: GRCH CURVE SHIFT DATA (MEASURED DEPTH) NPHI BASELINE DEPTH 9447.5 open hole logs run STOP DEPTH 9826.0 9826.0 9826.0 EQUIVALENT UNSHIFTED DEPTH RHOB 9447.5 9453.0 9453.0 9453.5 9453.5 9477.0 9475.5 9495.0 9493.5 9497.5 9496.0 9500.0 9499.0 9503.5 9502.5 9504.0 9502.5 9555.5 9556.0 9560.5 9560.5 9560.0 9563.5 9563.5 9575.5 9575.5 9594.0 9594.5 9609.0 9609.0 9616.0 9615.5 9633.0 9633.0 9636.5 9637.5 9640.0 9640.0 9663.0 9663.0 9707.0 9707.0 9714.0 9714.0 9714.5 9729.5 9730.5 9732.5 9732.5 9741.0 9741.5 9740.5 9751.0 9751.0 9786.0 9786.0 REMARKS: CASED HOLE portion of MAIN PASS. into casing. DUE TO TOOL PROBLEMS, THE GR CURVE IS A COMPOSITE FROM SEVERAL DIFFERENT PASSES. DENSITY CURVE IS PRESENTED THROUGH CASED INTERVAL AT BP'S REQUEST (PE & DRHO NOT INCLUDED). FUCT, NUCT, TEND, & TENS WERE SHIFTED WITH NPHI. RB1 WAS SHIFTED WITH RHOB. CN WN FN COUN STAT / ? ?MATCH4. OUT /??MATCH5.OUT $ : BP EXPLORATION (ALASKA) : G - 30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2435 68 1 GAPI 4 2 NPHI 2435 68 1 PU-S 4 3 FUCT 2435 68 1 CPS 4 4 NUCT 2435 68 1 CPS 4 5 TEND 2435 68 1 LB 4 6 TENS 2435 68 1 LB 4 7 RHOB SDN 68 1 G/C3 4 8 RB1 SDN 68 1 DEG 4 4 43 310 01 1 4 43 995 99 1 4 43 995 99 1 4 43 995 99 1 4 43 995 99 1 4 43 995 99 1 4 49 995 99 1 4 49 995 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 37 Tape File Start Depth = 9826.000000 Tape File End Depth = 9311.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9280 datums Tape Subfile: 3 103 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 1 4 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9370.0 11704.0 DLL 9820.0 11730.0 ZDL 9371.0 11726.0 2435 9370.0 11710.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV CHT ISO ISO KNJT MODL GR CN KNJT ZDL KNJT TEMP PCM RB KNJT MIS DLL FTS $ SWIVEL SUB CABLEHEAD TENSION BRIDAL ISOLATOR BRIDAL ISOLATOR KNUCKLE JOINT MODAL SUB GAMMA RAY COMPENSATED NEUTRON KNUCKLE JOINT Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR RB-SUB KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG FEED THROUGH SUB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 21-JUL-95 FSYS REV. J001 VER. 1.1 1630 20-JUL-95 1105 21-JUL-95 11789.0 11765.0 9370.0 11728.0 1500.0 TOOL NUMBER 3944XA 3974XA 3997XA 3997XA 3921NA 3517XA 1309XA 2435XA 3921NA 2222MA/2222EA 3921NA 2806XA 3506XA 3975XA 3921NA 3967XA 1229MA/1229EA 6.000 9823.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: FLO-PRO 9.20 77.0 10.1 4.6 181.0 .078 .030 .087 .000 .175 .000 65.0 181.0 65.0 .0 65.0 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : THERMAL SANDSTONE 2.65 .000 TOOL STANDOFF (IN) : .0 REMARKS: MAIN PASS. DUE TO TOOL PROBLEMS, THE GR CURVE IS A COMPOSITE FROM SEVERAL DIFFERENT PASSES. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G - 30A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 Name Tool Code Samples Units GR DLL 68 1 GAPI RD DLL 68 1 OHMM RS DLL 68 1 OHMM SP DLL 68 1 MV TEMP DLL 68 1 DEGF CHT DLL 68 1 LB TTEN DLL 68 1 LB SPD DLL 68 1 F/MN ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN RB ZDL 68 1 DEG API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 17 310 01 1 4 17 220 10 1 4 17 220 09 1 4 17 010 01 1 4 17 660 99 1 4 17 635 99 1 4 17 635 99 1 4 17 636 99 1 4 46 350 01 1 4 46 356 99 1 4 46 358 01 1 4 46 280 99 1 4 46 631 01 1 14 SHR ZDL 1 15 CNC 2435 68 1 16 CNCF 2435 68 1 17 CN 2435 68 1 18 LSN 2435 68 1 19 SSN 2435 68 1 * DATA RECORD (TYPE# 0) Total Data Records: 822 4 PU-S 4 PU-S 4 PU-L 4 CPS 4 CPS 4 966 BYTES * 4 46 995 99 4 43 995 99 4 43 995 99 4 43 890 01 4 43 334 31 4 43 334 30 76 Tape File Start Depth = 11775.000000 Tape File End Depth = 9311.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 259526 datums Tape Subfile: 4 912 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASS Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 5 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9945.5 10290.5 DLL 10004.5 10350.0 ZDL 9977.5 10312.5 2435 10013.5 10288.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV CHT ISO ISO KNJT MODL GR CN KNJT ZDL KNJT TEMP PCM RB KNJT MIS DLL FTS $ SWIVEL SUB CABLEHEAD TENSION BRIDAL ISOLATOR BRIDAL ISOLATOR KNUCKLE JOINT MODAL SUB GAMMA RAY COMPENSATED NEUTRON KNUCKLE JOINT Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR RB-SUB KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG FEED THROUGH SUB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS 21-JUL-95 FSYS REV. J001 VER. 1.1 1630 20-JUL-95 1424 21-JUL-95 11789.0 11765.0 9370.0 11728.0 1500.0 TOOL NUMBER 3944XA 3974XA 3997XA 3997XA 3921NA 3517XA 1309XA 2435XA 3921NA 2222MA/2222EA 3921NA 2806XA 3506XA 3975XA 3921NA 3967XA 1229MA/1229EA 6.000 9823.0 .0 MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G - 30A : PRUDHOE BAY : NORTH SLOPE : ALASKA ~O-PRO 9.20 77.0 10.1 4.6 181.0 .078 .030 .087 .000 .175 .000 THERMAL SANDSTONE 2.65 .000 .0 65.0 181.0 65.0 .0 65.0 .0 * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 GR DLL 68 1 GAPI RD DLL 68 1 OHMM RS DLL 68 1 OHMM SP DLL 68 1 MV TEMP DLL 68 1 DEGF CHT DLL 68 1 LB TTEN DLL 68 1 LB SPD DLL 68 1 F/MN ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN RB ZDL 68 1 DEG SHR ZDL 68 1 CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L 4 17 310 01 1 4 17 220 10 1 4 17 220 09 1 4 17 010 01 1 4 17 660 99 1 4 17 635 99 1 4 17 635 99 1 4 17 636 99 1 4 46 350 01 1 4 46 356 99 1 4 46 358 01 1 4 46 280 99 1 4 46 631 01 1 4 46 995 99 1 4 43 995 99 1 4 43 995 99 1 4 43 890 01 1 18 LSN 2435 1 CPS 19 SSN 2435 68 1 CPS * DATA RECORD (TYPE# 0) Total Data Records: 147 966 BYTES * 4 43 334 31 4 43 334 30 76 Tape File Start Depth = 10362.000000 Tape File End Depth = 9922.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 44501 datums Tape Subfile: 5 233 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 6 is type: LIS 95/ 7/24 01 **** REEL TRAILER **** 95/ 7/25 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 25 JLY 95 8:08a Elapsed execution time = 16.37 seconds. SYSTEM RETURN CODE = 0