HomeMy WebLinkAbout195-051 • • LEck 3-3-7 Pm t4%'5tk Regg, James B (DOA) From: Taylor Wellman <twellman@hilcorp.com> , 11-7(00 Sent: Wednesday, July 06, 2016 3:59 PM l To: Regg, James B (DOA); Brooks, Phoebe L (DOA) Cc: Wyatt Rivard Subject: RE: END 3-37 (PTD # 1950510) Returned To Production Without 6 Month SVS Test Attachments: NORTH END SDI 5-19-16 Misc..xls Jim, Attached to this email is a copy of the passing SVS test result for END 3-37 (PTD#1950.510). The witness for this test was waived and the test was performed and passed on 05/19/16. Hilcorp will still implement the changes we highlighted in the previous email as we believe that it will help to improve our system but did want to send confirmation that we did have a passing test for this well and it was operated in compliance. The main error for this was in a misfiled copy of the test on our server. Thank you and sorry for any inconvenience that this has caused. If you have any questions please feel free to contact Wyatt or myself. Note that Wyatt will be out of town until next week if any questions come up. Thank you, Taylor — a-4=-0A Pt-i-s SUSS Taylor Wellman Hilcorp Alaska, LLC–Ops Engineer: Endicott& Northstar �p��� AS Office: (907) 777-8449 ea NOV 2 22016 Cell: (907) 947-9533 . �`' Email: twellman@hilcorp.com From: Wyatt Rivard Sent: Friday, July 01, 2016 4:28 PM To: Regg, James B (DOA); 'Brooks, Phoebe L (DOA)' Cc: Taylor Wellman Subject: RE: END 3-37 (PTD # 1950510) Returned To Production Without 6 Month SVS Test Jim, Please see attached passing SVS test results for END 3-37 (PTD# 1950510). An u• itnessed test was performed on 6/29/16 and then an AOGCC witness waived SVS test was performed on 7/ 6.All systems passed. In addition to verifying the well's SVS systems, Hilcorp evaluated th- cident to determine if there were any improvements that could be made to the tagging process to ens e tags/tests are not missed.The following actions will be taken going forward: 1) A plastic clamshell will be installed over the g hydraulic pressure control valve handle at the time that a well falls out of the 6 month SVS testing cycle. e tag stating that the well needs an SVS test when brought online will then be attached to the clamshell. I• this way, the valve cannot be operated and thus the well cannot be brought online without the removal . the clamshell and acknowledgement of the tag. 1 ' • • S Regg, James B (DOA) From: Wyatt Rivard <wrivard@hilcorp.com> Sent: Friday,July 01, 2016 4:28 PM To: Regg, James B (DOA); Brooks, Phoebe L (DOA) Cc: Taylor Wellman Subject: RE: END 3-37 (PTD# 1950510) Returned To Production Without 6 Month SVS Test Attachments: SVS END SDI 07-1-16 MISC.xls; SVS END SDI 06-29-16 MISC.xls; HAK IN_END 3-37 Missed SVS Test_6-29-16.docx Jim, Please see attached passing SVS test results for END 3-37 (PTD# 1950510). An unwitnessed test was performed on 6/29/16 and then an AOGCC witness waived SVS test was performed on 7/1/16. All systems passed. In addition to verifying the well's SVS systems, Hilcorp evaluated the incident to determine if there were any improvements that could be made to the tagging process to ensure tags/tests are not missed. The following actions will be taken going forward: 1) A plastic clamshell will be installed over the wing hydraulic pressure control valve handle at the time that a well falls out of the 6 month SVS testing cycle. The tag stating that the well needs an SVS test when brought online will then be attached to the clamshell. In this way,the valve cannot be operated and thus the well cannot be brought online without the removal of the clamshell and acknowledgement of the tag. 2) A list of tagged/off-cycle wells will be maintained on a board in the control room.The list will provide a single point of reference for which wells will require an SVS test when brought online. 3) An incident summary(attached) has been distributed to field operations personnel at Northstar, Endicott and Milne Point. If you have any questions please let me know. Thank You, Wyatt Rivard Well Integrity Engineer 0: (907) 777-8547 ( C: (509)670-8001 I wrivardCthilcorp.com 3800 Centerpoint Drive,Suite 1400 (Anchorage,AK 99503 Him .ttok4ka.LI,(: From: Wyatt Rivard Sent: Wednesday, June 29, 2016 11:47 AM To: Regg, James B (DOA) Subject: END 3-37 (PTD # 1950510) Returned To Production Without 6 Month SVS Test Jim, Hilcorp has identified that Endicott producer END 3-37 (PTD# 1950510) was recently returned to production without a current 6 month SVS test • • Background Endicott producer END 3-37 (PTD# 1950510)was due for 6 month SVS testing in May of 2016.The well was shut in on 5/1/16 for water handling and missed the subsequent pad level SVS testing of SDI that was conducted on 5/13/16 (attached).At the time of pad level SVS testing, a tag was installed on the well's SVS panel stating that the well required an AOGCC witnessed SVS test when returned to production. Incident On 5/16/16, the well was RTP'd but a follow-up witnessed SVS test was not conducted.The procedure for an out of cycle well tagged in this manner, is for the operator to remove the tag and promptly make notification to the AOGCC for an upcoming SVS test. In this instance,the tag was not recognized or removed.This morning, an operator identified the tag and Hilcorp confirmed the well had not been tested once returned to production. The last 180 day test was performed on 11/17/15(attached), all systems passed. Path Forward A witness notification has been submitted for an upcoming SVS test. Hilcorp is examining the incident to determine if there are improvements that can be made to the tagging process to ensure that tags are not missed. Follow-up will be provided by Friday July 1, 2016. Please call with any questions. Thank You, Wyatt Rivard Well Integrity Engineer 0: (907) 777.834.7 I C: (509)670-8001 I wrivardOhilcorp.com 3800 Centerpoint Drive,Suite 14001 Anchorage,AK 99503 2 . . S \ 2 c / 7 i \ = 5 { / J - c. \ i z r--. z l _ ~ [4 ƒ * , z \ N / \ � / / s... G \ \ \ \ \\ R R \ a>) S 7 •& _ 6 5u0 \ \ - 2 — k \ 7 4) O _ • a Iii O. CI t% I 2 G k J k $ § 2 kr) » % 2 •\ 2 c \ \ �. H ) k ` co \ - _ —1' v 4 \ / Z con I ct % vJ \ •/ C...; ( 2 S \ ® \ a I ( ; > p a ) / Q . CA / > •/ \ - ,,_as k 2 ± 7 m - a :/ ( - t 2 @ '� 3 7 a -0 I je. $ / E \ \ / \ \ � 3 t ) $ 2 •2 k 2 c % 5 / $ G ) / \k k k \ 4 §ESU a 44 \ -o r2 / ' - z - \ o/ , w 2 / ¢ = 2 ] / \ % m \ • Regg, James B (DOA) From: Wyatt Rivard <wrivard@hilcorp.com> Sent: Friday, July 01, 2016 4:28 PM ice1 q To: Regg, James B (DOA); Brooks, Phoebe L (DOA) Cc: Taylor Wellman Subject: RE: END 3-37 (PTD # 1950510) Returned To Production Without 6 Month SVS Test Attachments: SVS END SDI 07-1-16 MISC.xls; SVS END SDI 06-29-16 MISC.xls; HAK IN_END 3-37 Missed SVS Test_6-29-16.docx Jim, Please see attached passing SVS test results for END 3-37 (PTD# 1950510). An unwitnessed test was performed on 6/29/16 and then an AOGCC witness waived SVS test was performed on '___71111.6.All systems passed. In addition to verifying the well's SVS systems, Hilcorp evaluated the incident to determine if there were any improvements that could be made to the tagging process to ensure tags/tests are not missed.The following actions will be taken going forward: 1) A plastic clamshell will be installed over the wing hydraulic pressure control valve handle at the time that a well falls out of the 6 month SVS testing cycle.The tag stating that the well needs an SVS test when brought online will then be attached to the clamshell. In this way,the valve cannot be operated and thus the well cannot be brought online without the removal of the clamshell and acknowledgement of the tag. 2) A list of tagged/off-cycle wells will be maintained on a board in the control room. The list will provide a single point of reference for which wells will require an SVS test when brought online. 3) An incident summary(attached) has been distributed to field operations personnel at Northstar, Endicott and Milne Point. If you have any questions please let me know. Thank You, Wyatt Rivard I Well Inti t r•ity EngLnee r 0: (907) 777 8317 ( C: (5O9)670-8OO1 I wrivard@hilcorp.com :3800 Centor1_)O1 ) Drive;Suit)) 1100 ( An(nor=0e,AK 9950. 1#iii rrl '4i.a 4.,xr ,J,4: From: Wyatt Rivard Sent: Wednesday, June 29, 2016 11:47 AM To: Regg, James B (DOA) Subject: END 3-37 (PTD # 1950510) Returned To Production Witho . Month SVS Test Jim, Hilcorp has identified that Endicott producer END -37 (PTD# 1950510) was recently returned to production without a current 6 month SVS test 1 r imilimir Incident Notification — Missed SVS Test — Event Date: 29 June 2016 Hilcorp Alaska, 1.1.1. Location: END 3-37, Endicott (PTS 1 25Osi0 Description: Producer END 3-37 was due for a 6 month Safety Valve System (SVS) test in May, 2016. The well had been shut in on 5/1/16 for water handling and missed pad level SVS testing that was conducted on 5/13/16. At the time of pad level testing, a tag was installed on the well's SVS panel stating that the well required a State test when returned to production. On 5/16/16, the well was put on production but a follow-up SVS test was not conducted. Normally, the tag would be removed and notification promptly made to the AOGCC for an upcoming test. In this instance, the tag was not recognized or removed. On 6/29/16 an operator identified the tag and well was confirmed to have not been tested once returned to production. What Went Right: SVS panel was correctly tagged when well missed its 180 day state test. Once missed test was recognized, it was quickly communicated to AOGCC and well was tested with all systems passed. What Went Wrong: The tag was not recognized or removed when the well was first returned to production and ultimately the well never received a valid SVS test within 5 days of return to stabilized production as per 20 AAC 25.265. What Can Be Done to Make it Right: Going forward, when a SI well misses its 180 day SVS test at Endicott, a clamshell will be installed over the wing pressure control valve. The "Needs State Test" tag will be attached to the clamshell so there is no way it can be missed when it is time to open the wing valve and bring the well online. Additionally, a white board outside of the Lead Operator's office will be used to track tagged wells in need of an SVS test. WO. fJ' ��7YM1eI �.� - reiP 9 I — 4-42 ;i>� l Po � i/ - s�. I LHG I s 4eres*pop 001 -NpTcE r t} y 4 -50 , N :. t7 ROW-5 li .'" :,,...1,1°.. R OW-ii 502. Figure 1:Tagged Clamshell Over Wing Valve Figure 2:White Board to Track Tagged Wells In Need of Test . \ Z y 0 . .0 & 2 5 ® 1 U 3 > zCD ƒ \ 0 \ v) y _ ~ / / £ / z \ N / \ � / G & \ \ \ k} S / ®Z /\ 0 % Viz = § & 5 © 0 a \ I � � a c - - 2 J } - \ / a k q % o k O L. a / = 7 , . \ E t / _ @ _ § a q \ § , 2 / / ¢ u . o O ° = m . - \ 0 \ / \ VI k Cli \ aln } \ § § y e •: ) a { ; M ` % o * \ » o = . \ \ z \ \ { � � . /\ C.) = 2 r _ > 7 2 7 \ 2 & ® « / \ _ ] o 0 . § ea . @ \ \ k / ® } ) .f E ¥ } X § [ / � § _ \ \ / \ c ./ % - Q m O R. = � _ \ 2 $ % \ / § E E 3 - \ " \ \ § % g 2 A CID no CT§ < 0 / - z . \ 0 < § \ � _ \ k a (---- \ . • • \ s o A / / X U U K / 6 \ t cp , / z y N / � - z ƒ a ƒ \ \ 0-I \ CA / o & ( 3 - o ■ \ \\ S 7 3 / � 0 & §j3 / _ / Cr0 a 7 / g ) / d 7 5 \ « - \ k k ./ A 2 2 j 1. \ (A ® \ LO © ° - ^ \ \ / \ e = / { z . c k } / \ / \ § = Q » _ ° / co \ •'\ ) § C.) « g / % ` . •E & > = e m G '§ . > \ \ \ \ \ 2 ? 7 •- 7 •/ \ = t Q ¥ \ - z a ] \ g \ - \ \ / / ƒ 2 \ , 0 ob % - $ \ \ •- % c £ © Q / -) $ / EE 3 -\ _ a4 c4 E , \ /k/ � .. \�0 � � Z \®o\ ~ I CD co ¢ = 2 CG / 71,' / \ - r • Regg, James B (DOA) From: Wyatt Rivard <wrivard@hilcorp.com> cei m 41telli P Sent: Wednesday, June 29, 2016 11:47 AM �'�'� To: Regg, James B (DOA) Subject: END 3-37 (PTD # 1950510) Returned To Production Without 6 Month SVS Test Attachments: SVS END SDI 11-17-15.xls; SVS NORTH END SDI 5-13-16.xls Jim, Hilcorp has identified that Endicott producer END 3-37 (PTD# 1950510) was recently returned to production without a current 6 month SVS test Background Endicott producer END 3-37 (PTD# 1950510) was due for 6 month SVS testing in May of 2016. The well was shut in on 5/1/16 for water handling and missed the subsequent pad level SVS testing of SDI that was conducted on 5/13/16 (attached). At the time of pad level SVS testing, a tag was installed on the well's SVS panel stating that the well required an AOGCC witnessed SVS test when returned to production. Incident ZQ (rylQz� n octt,tc-iz On 5/16/16, the well was RTP'd but a follow-up witnessed SVS test was not conducted. The procedure for an out of cycle well tagged in this manner, is for the operator to remove the tag and promptly make notification to the AOGCC for an upcoming SVS test. In this instance,the tag was not recognized or removed. This morning, an operator identified the tag and Hilcorp confirmed the well had not been tested once returned to production. The last 180 day test was performed on 11/17/15 (attached), all systems passed. Path Forward A witness notification has been submitted for an upcoming SVS test. Hilcorp is examining the incident to determine if there are improvements that can be made to the tagging process to ensure that tags are not missed. Follow-up will be provided by Friday July 1, 2016. Please call with any questions. 3 ti rkk C41-7( ,nom Thank You, s ws Wyatt Rivard I Well Integrity L ngineer �_ 0. (907) 777-8547 I C: (509)670-8001 I wrivard@hilcorp.com -r16s, it dartg'e 3800 Centerpoint Drive,Suite 1400 Anchorage,AK 99503 �J wets otoWed. ctr4e- P G.% 03-37 «-G,c-- Ifit - i*ka..ILC N �, ��a p tkMMow ce J -� (fes) q 461) 4 AQ(c, of- d ss eek —4 r 1II Ii, . • • iC az 0 0 0 0 0 0 0 0 0 0 0 tt 4, zz zz zzzzzzz x )-- 4 N N O a) N N Q v 121 z w CA on CA O ►-i ' N 00 Al O O N O In v) 00 :EV) O N M O N N O M 0 C M R Q. M M M M M M M M M N M L. L. t yL d00 O 0 o O O O O N N 0 V1 00 O O O - O - O N z. O #, in M N M N M N N - , , s 6. O O O O O O O o O O O - vi O 00 vD O kr) vi kr) O vi O O� .0 00 O CD N Cr, N C Ma. N ..r ti cin g Al C1 .Z. W cv o U 1 .a .-1 1 .-.1 ..a .-a 4 �, Q 6❑' E.,,, 3 � � cn00 'n00c' 0665oco33 c4 o ili w L.. Q LILOa, 0) q a4 a v, O 01) = o O 0 L., 10 V1 O o O N a-' ,A a.) A IA) 00 M ..-1i L i C 0 0 C4 C6 O A A 1 M Et d b U c a. a a a o. a a. a a a. a N pi V 0 0N CO aF" soot C w p wa as aaaaaa.. a. -- d E •°i z F" U o U c as ° — 0 i A r 0) V •0 0 p a, a. a. a. a. a. a. a. a. a. a. �; C7 ma . °' CJ CN Erg. M O o E V] 0. .fl" so N O Q, N N o M cn w'5 m '�" ti .� L 00 OD a, 00 .N 00 00 00 00 00 O N C R CC ti M a) A '0 ++ .. o o O O 0 0 0 0 0 0 0 im'„ M U .-i .-. �-. .-. CP, rnM 0 e, ate) L ,,iii M 0 > 0 — '71' V 7r V N N N N 0 .--1U L = V] 00 00 00 00 00 00 00 00 00 00 00 0 M 13 CL, N N N N N N N N N N N C) M - O O O O O O O O O O O O O O O O O a. a. ,6 L * O N CD N 71' M Vl — M VO Mt N AlVl — N 0O a) V cC a: O4N M 00 0, Myl N 00 An Si A) 0\ Al r. - - 0 0 0 0 o O — N N 0 0 0 0 ---- W s. L E N Q 00 .n 00 N N C M \ o N M V1 N 0 N Oa 0 U a Z o 00 rn a 00 00 00 00 00 rn a o rn a 00 a . . . . . . r. r. r. N 0. 0 q C o O ti E as L � 4 a. 3 E ¢ ¢ M ¢ ¢ ¢ �; 7 M Ln N a, .-. ,nM M N a, — M N a1 N O, , Z 0 0 0 0 i N N N N N M M M M 7 V �d M M M M M M M M M M M M M M M M M •T II • , o Z o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ttZ 2 Z Z Z 2 Z Z Z z z 2 Z Z z z Z Z is c 0) 0) 0) 0) Ca N 7 1m .a) 0 a) 0 a) a) a) a) a) 0) a) a) a) Cl) Cl) Cl) a) CA >- >-. ›. > J- > >- > > ›. > >- J- > >-. p et V w v, o0 00 0v-Ivi ,n ,n o 0 00, o v, o oO F- O O V N N r. O, M N M N- N ma O O O, O 00 M M mm M M N M M M N N M N M M N M CeO ,- Z = 00 CA cA i 00 00 0 0 0 0 0 O O 000 O O 00 a1 O ,O O N O N O N 00 Orr —. rt N N 7 N N —, ,— (,) .- M 00N C, p• .� • C. ti 00 O Nn 00000 O O 000 O 00 O Nn Ink() 0 l� kr)_I O O kr) O � 00 VD 00 - O N 00 00 00 n aa` O, kr) - — ON 00 0o N tr) N 00 a) •■ CCA 0.. �O z O rn � - c o5E7 (75073o7oo5o3 70330 00O767677776o w y, ; - o0 0 0 0 0 0 0 0000 Q s a. r- N N N N N N N N NNNN a y n owo N N � .. N O, MSSV 6 L'') V) 00� aA °44:4, 0 • � .6 A aoc a Z `' F V 0. 0. 0. 0. a. 0. 0. a. 0. a. a. a. a. a. 0. 0. 0. 0. �C 4. ojC a , v E- > o ,. d 0 a a a. a, a a O. a. a. a O. a. v a O. a P. A. a) E L Z ( F V • �• ' o a 0 P. O. as aa. aaa P. P. a- a a. a a as " U -0• > .. ---a ,9- O O ,r N O N N- V vl N- \O N vl M N mo = w I) V] Cm fl" 0, (Too 00 00 00 00 00 00 00 00 00 00 00 00 aa, - c., w J L .-. ., - - . . . . . .1 ... — .-. — r. .-. ,-. O CA o - C 00 00 0 0 0 0 0 0 0 0 0 0 0 0 00 0-1o, 0, o, 0, 0, a, o, a\ a, o, Cr, a CNC, 0, a, 0, C, Q Q ❑ i a) O" m 0 L SS SS SSSSS N N- SSS N- N SS 0 cd CO006, SS SS SSSSS N- N- - - N- N- - SS 12 > Cd;4' 0. a N N NN NNNNN N N ("INN N N NN x ;ti V) O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O LL C. • L O N- a, N � M m. •-- M �O N- vi .-• -- N- N 0, 00 N D1 M N '--- a, m. Q1 C ,O a) a) N M V oo a, M in N oo kn N — a1 N ^ ,,O M r- N .-• n s ,O -- i tx = - .-. — 0 0 0 0 0 0 ^- N N o O o O o o N o ^- ^- o• -- O ,-. 0 0 0 0 -- y t, y 6 E N ,0 00 Wn 00 S S M s0O n M A) S ,0 S 00 a, N W W l0 00 00 V'1 ,0 7Fn al a, E. 0 U C ) Z 0, 00 0, 0, 00 00 00 00 O 00 Q, a, o 0, 0, 00 0, 00 O 0, o 0 00 00 00 00 0, 0, 0, 00 woo N cD Q . . . o 00 0 < y QA N N O M N 0, 00 N M N M M w) 00 M N M 0 d' [� 00 00 co Q1 • r .a M N .� M M M M N M ti M rte. M N ' ...7 C� M M M M M M M M M 7r a. Ego ¢ ¢ Cq ''' a < a<¢ '¢ ¢ ¢ � —9 C— o M a1 ,-- M •-+ M a1 N- N V \a O 00 O 0 00 N7r 00 N O Z O O o o N N N N N M M M M V 0 0 0 •-� N N N M M M i va M M M M M M M M M M M M M M M M M V' �' 7rd' 4 4 V �h 4 4 d' 7 d' • • , 1tt r k �r �O h xi H O _ CA � o ° ti y rr • CA I C a t N O w .• fir N d a (03 tt � aa � A O a � U A d o t U • c a .0- ;7-) c-_ .a ti 41. y ., ti • a „ r CL 0. 4. Q0 Ed A a z Ea. • • Post Office Box 244027 /� Anchorage,AK 99524-4027 Hilcorp Alaska,LLC JUL 3 0 201`1 3800 Centerpoint Drive Suite 100 AOGCAnchorage,AK 99503 Phone: 907/777-8300 Fax: 907/777.-8301 July 29, 2015 Commissioner Cathy Foerster Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 q5-_ SL 3- 37 Re: Duck Island Unit Well Renaming Request 01 -6/(e)SGR�vtiE� SSP Dear Commissioner Foerster, Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island Unit wells to remove the unused suffixes at the end of each well name. Well names currently include a forward slash "I" followed by an obsolete bottom hole location designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21" would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original and new names for all Duck Island wells. While performing the review of Duck Island well names, HAK found a single well, "DUCK IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A" label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI 4-20/T34" (PTD # 1861500). The original wellbore, abandoned 10/13/1986, was sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to be one of the first sidetracks performed at Endicott. While the bottom hole code was changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also included on the attached spreadsheet. Sincerely, Wyatt Rivard Well Integrity Engineer Hilcorp Alaska, LLC CC Dave Roby Victoria Loepp Orig New API_WeIINo PermitNumber WellName WellNumber WellNumber 50029219460600 2032160 DUCK IS UNIT SDI 3-17F/K30 3-17F 50029224630000 1940490 DUCK IS UNIT SDI 3-19/R28 3-19 50029217140000 1870330 DUCK IS UNIT SDI 3-21/L34 3-21 50029217149500 1980190 DUCK IS UNIT SDI 3-21AK35XX 3-21AXX 50029216450000 1861550 DUCK IS UNIT SDI 3-23/N32 3-23 50029221250000 1901820 DUCK IS UNIT SDI 3-25/M27 3-25 50029221250100 2010200 DUCK IS UNIT SDI 3-25A/N24 3-25A 50029221250200 2030210 DUCK IS UNIT SDI 3-25B/L27 3-25B 50029215860000 1860830 DUCK IS UNIT SDI 3-27/M33 3-27 50029221060000 1901560 DUCK IS UNIT SDI 3-29/J32 3-29 50029228380000 1972270 DUCK IS UNIT SDI 3-31/K32 3-31 50029216680000 1861800 DUCK IS UNIT SDI 3-33/K37 3-33 50029216680100 2032150 DUCK IS UNIT SDI 3-33A/J35 3-33A 50029217010000 1870200 DUCK IS UNIT SDI 3-35/L36 3-35 50029225540000 1950510 DUCK IS UNIT SDI 3-37/L35 3-37 50029217640000 1871160 DUCK IS UNIT SDI 3-39/J39 3-39 50029217640100 1970910 DUCK IS UNIT SDI 3-39A/I37 3-39A 50029218780000 1881260 DUCK IS UNIT SDI 3-41/K39 3-41 50029224160000 1931700 DUCK IS UNIT SDI 3-43/P36 3-43 50029218110000 1880510 DUCK IS UNIT SDI 3-45/M39 3-45 50029215690000 1860640 DUCK IS UNIT SDI 3-47/Q35 3-47 50029217350000 1870600 DUCK IS UNIT SDI 3-49/J40 3-49 50029217350200 1970570 DUCK IS UNIT SDI 3-49A/M40 3-49A 50029217359500 1950350 DUCK IS UNIT SDI 3-49A140XX 3-49AXX 50029217890000 1880220 DUCK IS UNIT SDI 4-02/Q28 4-02 50029219680000 1890860 DUCK IS UNIT SDI 4-04/T26 4-04 50029219680100 2090190 DUCK IS UNIT SDI 4-04A/T30 4-04A 50029217230000 1870430 DUCK IS UNIT SDI 4-06/032 4-06 50029217230100 1961660 DUCK IS UNIT SDI 4-06A/Q30 4-06A 50029216920000 1870080 DUCK IS UNIT SDI 4-08/P27 4-08 50029224640000 1940500 DUCK IS UNIT SDI 4-10/M28 4-10 50029224640100 2022380 DUCK IS UNIT SDI 4-10A/L28 4-10A 50029218630000 1881040 DUCK IS UNIT SDI 4-14/R34 4-14 50029218630100 2080120 DUCK IS UNIT SDI 4-14A/S-37 4-14A 50029218960000 1881490 DUCK IS UNIT SDI 4-18/S30 4-18 50029216400100 1861730 DUCK IS UNIT SDI 4-20/M35 4-20A 50029216400000 1861500 DUCK IS UNIT SDI 4-20/T34 4-20 50029218350000 1880720 DUCK IS UNIT SDI 4-26/034 4-26 50029218700000 1881110 DUCK IS UNIT SDI 4-28/N37 4-28 50029225590000 1950690 DUCK IS UNIT SDI 4-32/K38 4-32 50029227050000 1961550 DUCK IS UNIT SDI 4-34/038 4-34 50029224820000 1940740 DUCK IS UNIT SDI 4-38/134 4-38 50029222650000 1920420 DUCK IS UNIT SDI 4-40/P43 4-40 50029217310000 1870560 DUCK IS UNIT SDI 4-42/P38 4-42 50029222540000 1920190 DUCK IS UNIT SDI 4-44/M44 4-44 50029222549500 1970470 DUCK IS UNIT SDI 4-44AM40XX 4-44AXX 50029219570000 1890690 DUCK IS UNIT SDI 4-46/N39 4-46 50029219720000 1890970 DUCK IS UNIT SDI 4-48/K43 4-48 50029219400000 1890440 DUCK IS UNIT SDI 4-50/1(41 4-50 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages' [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Bevedy incent Nathan Lowell Date: [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~ • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 5irAtIMED 2 0 x012: May 22, 2012 Mr. Jim Regg Z ! `� 4' S Alaska Oil and Gas Conservation Commission '" AA 11 Y 333 West 7 Avenue �1v Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of Endicott Row 3 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott Row 3 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, i Mehreen Vazir BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Endicott Row 3 Date: 10/03/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal END3 -01 / N -29 1861900 50029216780000 7.0 4.4 0.3 9/6/2010 1.70 10/3/2010 END3 -03 / J-33 1921210 50029223060000 8.0 6.1 0.3 9/6/2010 2.55 10/3/2010 END3 -05 / 0 -29 1861300 50029216240000 3.0 2.0 0.5 9/6/2010 3.40 10/3/2010 END3 -07A / L -29 1981470 50029219110100 2.0 0.5 0.3 9/6/2010 1.70 10/3/2010 END3 -09 / L -28A 1950190 50029217800100 0.1 NA 0.1 NA 1.00 10/3/2010 END3 -15 / K-33 1870940 50029217510000 0.1 NA 0.1 NA 1.00 10/3/2010 END3 -17F / K-30 2032160 50029219460600 1.5 0.5 0.5 9/6/2010 2.55 10/3/2010 END3 -19 / R -28 1940490 50029224630000 10.0 17.0 0.3 9/6/2010 1.70 10/3/2010 END3 -21 / L -34 1870330 50029217140000 23.0 14.5 1.1 9/6/2010 13.60 10/3/2010 END3 -23 / N-32 1861550 50029216450000 1.5 1.0 0.5 9/6/2010 3.40 10/3/2010 END3 -27 / M -33 1860830 50029215860000 1.0 0.1 0.6 9/6/2010 2.55 10/2/2010 END3 -29 / J -32 1901560 50029221060000 2.0 _ 1.0 0.6 9/6/2010 3.40 10/2/2010 END3 -31 / K-32 1972270 50029228380000 2.0 _ 3.0 0.5 9/6/2010 3.40 10/2/2010 END3 -33A / J -35 2032150 50029216680100 0.5 NA 0.5 NA 3.40 10/2/2010 END3 -35 / L -36 1870200 50029217010000 10.0 7.0 0.4 9/6/2010 3.40 10/2/2010 ,-7 END3 -37 / L-35 1950510 50029225540000 8.0 7.3 0.3 9/6/2010 1.70 10/2/2010 END3 -39A /1-37 1970910 50029217640100 1.0 0.8 0.7 9/6/2010 3.40 10/2/2010 END3 -49A / M-40 1970570 50029217350200 0.4 NA 0.4 NA 1.70 10/2/2010 t o~oams I Scht~nnh~rger Alaska Data 8 Consulting Services 2525 Gambell Street, SuNe 400 Anchorage, AK 99503-2838 ATTN: Beth ~'~ DF ;~ ~ ~ 2009 Well Job tt Log Description NO.5410 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Date BL Color CD MPC-OSA L4-03 L5-05 11661124 AYt M-00032 AP3Q-00061 MEMORY PROD PROFILE PRODUCTION PROFLE PRODUCTION PROFILE 01/25/07 09/09/09 09/15/09 1 1 1 03-24A 07-32B AZCM-00042 BOCV-00027 LDL JEWELRY LOGlGR W/PRESS/TEMP ~ 09/14/09 115!09 1 1 W-214 AYS4-00095 INJECTON PROFILE ~ -.j 09/12/09 1 04-26 07-21 W-04 B5JN-00014 AYS4-00098 88K5-00003 PRODUCTION PROFILE / PRODUCTION PROFILE PRODUCTION PROFILE 09/25/09 09/17/09 09/24/09 1 1 1 P2-53 5-43 12-23 AP3O-00060 AWLS-00037 AWL&00035 PRODUCTION PROFILE PRODUCTION PROFILE INJECTION PROFILE 09!13/09 09/25/09 09!19/09 1 1 1 05-38 W-29 W-30 3-372-35 AYTO-00029 AWJI-00050 AY7 M-00034 83S0-00024 LDL MEM INJECTION PROFILE PLUGBACK W/X-FLOW CHECK ~ PRODUCTION PROFILE U 09!18/09 09/20/09 09/12/09 09/16/09 1 1 1 1 NK-09 AP3O-00057 USR 09/07/09 1 W-07A 11-10 02-06B AWJI-00047 AYTU-00054 ANHY-00111 MEM CEMENT EVAL ATION USIT USIT 09/07/09 08/28!09 09!21/09 1 1 1 G-i6A AWJI-00048 MEM CEMENT BOND LOG ~ 09/17/09 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-t 900 E. Benson Blvd. C ~ ~--, o s 3- ~7JL`3~ Alaska Data & Consulting Services 2525 Gamhell Street, Suite 400 Anchorage, AK 99503-2836 ~~ osios/os • Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO.5271 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Date BL Color CD H-35 AYTO-00018 CROSS FLOW CHECK / 05/09/09 1 1 14-35 ANHY-00087 INJECTION PROFILE °'" - 05/15/09 1 1 06-08A AV1H-00012 IBP/FBS/CFS/GRADIO/PRESSIf P 05/11/09 1 1 A-44 AWLS-00017 SCMT 05/25/09 1 1 12-07A BOCV-00016 SBHP SURVEY 05/19/09 1 1 09-24 ANHY-00088 CROSS FLOW CHECK/IBP ~ 05/17/09 1 1 H-29A AYOO-00027 PPROF/RST - 05/19/09 1 1 09-09 AYTU-00032 CROSS FLOW CHECK - > 05/06/09 1 1 15-456 ANHY-00010 PRODUCTION PROFILE ~- 05/09/09 1 1 13-13A AYTU-00033 USIT - '~~ e' 05/08/09 1 1 M-19B AY3J-00024 PRODUCTION PROFILE 05/14/09 1 1 Z-12 ANHY-00084 INJECTION PROFILE 05/07/09 1 1 E-36A BiJJ-00018 MEM CNUSTP j 05/18/09 1 1 X-30A B2WY-00005 MEM PROD PROFILE C 05/10/09 1 1 12-23 AYKP-00021 USIT L - 05/08/09 1 1 W-34A AWJI-00031 MEM PROD PROFILE 05/19/09 1 1 Z-14B AZCM-00022 PROD PROFILE/JEWELRY LOG • ~- 05/20/09 1 1 L7-21 62NJ-00006 PRODUCTION PROFILE 05/24/09 1 1 A-31A AZCM-00023 USIT (~ - {o L 05/22/09 1 1 H-19B' B2WY-00004 MEM PROD PROFILE e. 05/07/09 1 1 G-16 AYKP-00022 SCMT / / - 05/09/09 1 1 M-19B AY3J-00024 SCMT - 05/15/09 1 1 12-37 AWL9-00032 PRODUCTION PROFILE ~!~ / 04/21/09 1 1 11-04A AYOO-00028 USIT J LI _ 05/21/09 1 1 18-30 B1JJ-00015 MEM PROD PROFILE JG/ 05/13/09 1 1 4-14A/S-37 AYKP-00024 PRODUCTION PROFILE ~ - 1 05/11/09 1 1 3-37/L-35 AWL9-00035 - PROD/INJECTION PROFILE 05/22/09 1 1 3-37/L-35 AWL9-00035 TEMPERATURE SURVEY 05/20/09 1 1 V-217 AYOO-00024 INJ PROFILE/RST WFL `} / fj/5 04/26/09 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONt COPY EACH i0: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. t '~~~ ~~~~YiFA n :s~i I ~ ~ L~k'~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 06/08/09 r 1 U s SC~b~l'I~~'I" Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO.5271 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Date BL Color CD H-35 AYTO-00018 CROSS FLOW CHECK ` 05/09/09 1 1 1435 ANHY-00087 INJECTION PROFILE 05/15/09 1 1 08-08A AViH-00012 IBP/FBS/CFS/GRADIO/PRESS/T P 05/11/09 1 1 A-44 AWLS-00017 SCMT 05/25/09 1 1 12-07A BOCV-00016 SBHP SURVEY 05/19!09 1 1 09-24 ANHY-00088 CROSS FLOW CHECKJIBP ~ 05/17/09 1 1 H-29A AYOO-00027 PPROF/RST 05/19/09 1 1 09-09 AYTU-00032 CROSS FLOW CHECK , 05/08/09 1 1 15-45B ANHY-00010 PRODUCTION PROFILE '~- 05/09/09 1 1 13-13A AYTU-00033 USIT - '~(~ l 05/08/09 1 1 M-19B AY3J-00024 PRODUCTION PROFILE 05/14/09 1 1 Z-12 ANHY-00084 INJECTION PROFILE 05/07/09 1 1 E-36A B1JJ-00018 MEM CNUSTP 1 e 05/18/09 1 1 X-30A B2WY-00005 C MEM PROD PROFILE 05/10/09 1 1 12-23 AYKP-00021 USIT - 05/08/09 1 1 W-34A AWJI-00031 MEM PROD PROFILE 05/19/09 1 1 Z-14B AZCM-00022 PROD PROFILE/JEWELRY LOG ~ (o- 05/20/09 1 1 Li-21 62NJ-00006 PRODUCTION PROFILE a- 05/24/09 1 1 A-31A AZCM-00023 USIT ZL - Q (U `- 05/22/09 1 1 H-196' 62WY-00004 MEM PROD PROFILE t- 05/07/09 1 1 G-16 AYKP-00022 SCMT / (- 05/09/09 1 1 M-196 AY3J-00024 SCMT - 05/15/09 1 1 12-37 AWL9-00032 PRODUCTION PROFILE C/C/ ` 04/21/09 1 1 11-04A AYOO-00028 USIT I L/ - 05/21/09 1 1 18-30 BiJJ-00015 MEM PROD PROFILE jG/ 05/13/09 1 1 4-14A/S-37 AYKP-00024 PRODUCTION PROFILE ~ ® i 05/11/09 1 1 3-37/L-35 AWL9-00035 PROD/INJECTION PROFILE e 05/22/09 1 1 3-37/L-35 AWL9-00035 TEMPERATURE SURVEY 05/20/09 1 1 V-217 AYOO-00024 INJ PROFILE/RST WFL ~ l~1lJ 04!26/09 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EAGR TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 1 oi2sioa Sehlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth WPII .Inh s N0.4939 Company: State of Alaska .~; ~ ~ ~ ~~~/ ~:; ~ ~UU~ Alaska Oil & Gas Cons Comm '' ~_,- 4;,,~p±~~,,,~,_ r' UU(D Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage,AK 99501 1 .... rf..~... s:.... 13-16 12103694 INJECTION PROFILE 10/20/08 1 1 3-37/L-35 11968960 RST -_ - 08/30/08 1 1 V-207 40017442 OH MWD/LWD EDIT p _ (0 1 08/01/08 2 1 V-207L1 40017442 OH MWD/LWD EDIT 08/05/08 3 1 -. ___~._ ..~ ...... ... ............. ......,...... v.vv~.w vn~ vvr ~ ce~a.n 1 v. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 - 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~,.., Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 995 -2838 ATTN: Beth Received by: • STATE OF ALASKA ALA OIL AND GAS CONSERVATION CO~SION REPORT OF SUNDRY WELL OPER~4TIONS ~~ /D~.?•08 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ Other ~ sand plug Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development j~ EXplOratory i= 195-0510 , 3. Address: P.O. Box 196612 Stratigraphic Service ~ 6. API Number: Anchorage, AK 99519-6612 50-029-22554-00-00 7. KB Elevation (ft): 9. Well Name and Number: 56.01 KB 3-37/L-35 8. Property Designation: 10. Field/Pool(s): ADLO-047503 - ENDICOTT Field/ ENDICOTT OIL Pool 11. Present Well Condition Summary: Total Depth measured 12600 - feet Plugs (measured) 12070' 9/12/08 true vertical 10488.22 feet Junk (measured) 12421' 9/9/08 Effective Depth measured 12590 feet true vertical 10465 feet Casing Length Size MD TVD Burst Collapse STRUCTURAL 90 30" SURFACE - 130 SURFACE - 130 SURFACE 5059 10-3/4" 45.5# NT-80 SURFACE - 5100 SURFACE - 4343 5210 2480 PRODUCTION 12551 7-5/8" 29.7# NT-95HSSURFACE - 12590 SURFACE - 10426 8180 5120 r'` J~ ~ ~ l7` ~ c^, 4 V 7 ~ Y ~ 3' ~~~ ~ . .. r . ~ 1~ l Perforation depth: Measured depth: SEE ATTACHED - _ _ True Vertical depth: Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 SURFACE - 11875' 0 0 - Packers and SSSV (type and measured depth) 7-5/8"x4-1/2" TIW HP-BP-1 11704' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 437 530 3784 464 Subsequent to operation: 143 389 3168 300 14. Attachments: 15. Well Class after proposed work Copies of Logs and Surveys Run Exploratory Development i~' - Service ~~~ Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~' - Gas ~ WAG I._.. GINJ ~~ WINJ ~ " WDSPL z W 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Pre ~ Title Data Management Engineer Signature Phone 564-4944 Date 9/29/2008 ~' Form 10-404~vised 04/2006 #,_ ~ ~ ~ g ~ ~ ~~ ~ ~ ~ Submit Ori final Onl 3-37/L-35 195-0510 PERF ATTACHMENT • • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 3-37/L-35 5/30/95 PER 12,032. 12,062. 9,943.4 9,972.2 3-37/L-35 5/30/95 PER _ 12,082. 12,090. 9,991.41 9,999.09 3-37/L-35 8/21/95 SQZ 12,032. 12,062. 9,943.4 9,972.2 3-37/L-35 8/21/95 SQZ 12,082. _ 12,090. 9,991.41 9,999.09 3-37/L-35 8/22/95 RPF 12,032. 12,058. 9,943.4 9,968.36 3-37/L-35 9/1/95 RPF 12,032. 12,058. 9,943.4 9,968.36 3-37/L-35 9/1/95 RPF 12,082. 12,090. 9,991.41 9,999.09 3-37/L-35 6/4/98 SQZ 12,032. 12,090. 9,943.4 9,999.09 3-37/L-35 6/15/98 APF 12,305. 12,335. 10,205.38 10,234.14 3-37/L-35 6/15/98 APF 12,335. 12,365. 10,234.14 10,262.88 3-37/L-35 6/15/98 APF 12,365. 12,395. 10,262.88 10,291.62 3-37/L-35 11/4/07 RPF 12,032. 12,042. 9,943.4 9,953. 3-37/L-35 11/4/07 RPF 12,042. 12,062. 9,953. 9,972.2 3-37/L-35 11/5/07 BPS 12,070.5 12,082. 9,980.37 9,991.41 3-37/L-35 9/7/08 BPS 10. 12,032. 10. 9,943.4 3-37/L-35 9/10/08 SPS 10. 12,082. 10. 9,991.41 3-37/L-35 9/20/08 APF 12,032. 12,062. _ 9,943.4 9,972.2 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED _ SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAN D PLUG SET FIL FILL SQF _ _ SQUEEZE FAILED MIR _ MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED _ _ STC _ _ STRADDLE PACK, CLOSED MLK MECHANICAL LEAK _ STO __ STR_A_ DDLE PACK, OPEN OH OPEN HOLE • • 3-37/L-35 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE i SUMMARY 9/7/2008 ***WELL SHUT-IN ON ARRIVAL"*' ''INITIAL T/I/O = 1800/2250/150 ' !LOCATED FLUID LEVEL 4850' WITH XFLOW FROM PERFORATIONS AT 12032'-12062' DOWN INTO PERFORATIONS 12082'-12090'., PERFORMED ', !'STOP COUNTS 12077' WHILE OPENING CHOKE TO ELIMINATED XFLOW 'WHEN WHP 1110-1400 PSI, MONITORED DOWNHOLE FOR 2.5 HOURS. SET ' ', 'BAKER 3 3/8" IBP WITH RESERVOIR TOOL, MOE 12077, OAL 11.59', FISHING ''NECK 1.75" OD LOCATED 12070.5' WITH 2X6" SEALS AND 1X1" STIFFENER ', 'RING. TOOLS BLOWN OFF LINE WHILE SETTING. 'TOOL SCHEMATICS SUBMITTED WITH JOB PACKET FOR. FISHING DETAILS (FISHING NECK= 1-3/16" `,° FINAL T/I/O = 970/2275/180 '''WELL LEFT SHUT-IN. VALVES LEFT AS FOUND. DSO NOTIFIED ' '' ''"**JOB INCOMPLETE*** 9/8/2008,~~"` WELL SHUT IN ON ARRIVAL~'~ "'RIH W/ 3.50" LIB..TAG FISH C~ 11.795' SLM ((;LEAN IMPR ''PULLED BAKER IBP RUNNING TOOL FROM 11,795' SLM ''*'CONT ON 9-09-08 WSR"** 9/9/2008 ***CONT FROM 9-08-08'`'`* !'BEAT IBP FROM 11,841' SLM OUT TT ~'' FISH PART OF IBP RUBBER BAG FROM 11,795' SLM (see log) ''TAG TT W/ 4-1/2" TEL @ 11,846' SLM +(13' CORK = 11,859' ELMD) SA[, IRP W/ 3.50" BI IND B(~X C~ 12,405' SLM +(13' CORK + 3' OF TOOLS 'BELOW TEL = 12,421' ELMD) !'ATTEMPT TO BEAT IBP FURTHER D TH REMAINS UNCHANGED !'FROM 12 421' ELMD `'***" FISH IN HOLE: 3 3/8" BAKER IBP W/ BAKER RUNNING TOOL (1 3/8" FN, "13.75' total length) **** f'***WELL LEFT S/I, TURN OVER TO WELL TENDER*'* 9/10/2008 CTU # 6 (sandback/cmt plug) (interact not publishing) RIH w/ bi-jars, 3 3/8" nipple '.locator, locate tail and reset~counter to MD 11875. paint flag @ 12100 & 12070. ';pooh MU BHA #2 RIH to lay in sand plug. '**job continued on 9/11/08 WSR *~~ 9/11/2008°`CTU # 6 1.75" CT Continued from 9/10/08 WSR (interact not publishing) RIH to lay ',', in sandplug. Lav 31 bbls slurry/ 7800# sand in from 12400' to 11432'. Taa sand top ""at 12150'. pooh. MU stingers and 2.65" pigs ear nozzle. RIH tie into flag @ 12100, ' retag sand top ~ 12150. load foam pig, 3.6 bbls 15.8 ppg cmt, foam pig ,ball .Lay "in 3.6 bbls 15.8 pp cmt from 12150 to 12070. POOH freeze protect coil Recovered' ''ball from nozzle. RDMO *'`" Job Complete ~~" ' ~ • 9/12/2008 """WELL SHUT IN ON ARRIVAL""'` RAN IN HOLE W/ 2.50" CENTRALIZER, TUBING END LOCATOR, & SAMPLE ``BAILER ;UNABLE TO PASS 11,580' SLM, HUNG UP POOH @ '`'`'`JOB CONT. ON 9/13/08*"* 9/13/2008'" ***JOB CONT. FROM 9/12/08" `:UNABLE TO MAKE HOLE PAST 11581' SLM (CEME noi~T 11,555' SLM AND JARRED W/ 3.625" BARBELL MADE SEVEN RUNS W/ 10'x3.0" PUMP BAILER FROM 11,584' TO 11,595' SLM KNOCKED CEMENT OFF TUBING WALL W/ 3.60" GAUGE RING @ 11,584' SLM C AILING @ 11,591' SLM W/10'x3.0" PUMP BAILER ***JOB CONT. ON 9/14/08*** 9/14/2008'`'`'`JOB CONT FROM 9/13/08**" ``ONE RUN W/ 10'x3.0" PUMP BAILER TO 11592' SLM, RECOVERED 1 OT. 'CEMENT N~RUN W/ 10'x3.5" PUMP BAILER TO 11583' SLM, NO CEMENT RECOVE ***WELL TURNED OVER TO DSO, LEFT WELL SHUT IN*"` __ __ _ 9/18/2008!' CTU #6, FCO Tbg.; MIRU CTU #6. RIH w/motor and 3.70" 4-blade bullnose mill. .,ni u~wi i ui y n i tuuu iu a~ I 1 JJV vu i iu iviincu .. ~~_~.~_~-~ ~ Syr- ~ ~ ctmd to at least 11825' ctmd. Remainder of tubing appeared relatively clean. DrY to ed TD at 12074' ctmd. PU depth was 12069' ctmd. Pumped several GeoVis sweeps while milling. P OH circulating at 80%.- LD Mill BHA -mill had 1 jet plugged w/cement - MU/RIH w/ PDS GR/CCL *'** Continued on 9/19/08 WSR **** 9/19/2008"'`'``* Continued from WSR 9/18/08 -CTU 6 - 1.75 CT -Mill Cmt **~' Tag TD at "12074 ctm/dn 12070 ctm/up -Log f/ 12074 ctm - 11800 ctm - POH verify log data - Good data add 1.7' correction to log- TD (TOC) at 12074 log depth -conduct infectivity test at .3 bpm / 2000 whp -Confer w/APE/CTC decision to perforate w/ °.,`e-line. Blow reel down for pipe swap (825k RF). RD CTU. ~~~ Job Complete ~~' 9/20/2008`*"WELL SI ON ARRIVAL **" • '':INITIAL T/I/O = 400/850/150, RUN 1, 3.375" GUN DRIFT RUN W/ 10' DUMMY GUN. SECOND RUN 30' 3-3/8" HSD GUN 6 SPF, 60 DEGREE PHASING. 'PERFORATE INTERVAL FROM 12032'-12062'. PULLED TIGHT AROUND 11630 ;WHILE POOH. WORKED TOOL STRING PAST AND POOH. "*'JOB CONTINUED ON 21-SEPT-2008'"'* 9/21/2008;.*** JOB CONTINUED FROM 20-SEPT-2008'** '':RIG DOWN 30' 3-3/8" HSD GUN 6 SPF, 60 DEGREE PHASING AFTER ''PERFORATING INTERVAL FROM 12032'-12062'. WELL LEFT SHUT IN, ''MASTER OPEN, CASING VALVES OPEN TO GAUGES, SSV LEFT SHUT IN, ''DSO NOTIFIED. '~~!***JOB COMPLETE*** FLUIDS PUMPED BBLS 66 DIESEL 145 METH 975 KCL 50 BIO 44 GEOVIS 1276 Total WELL LOG S TRA/VSM/TTAL i3 ProActive Diagnostic Services, Inc. • To: AOC~C Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP E~loration (Alaska], Inc. Petrotechnicat Data Center Attn: Joe Lastuflca LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax (907) 245-8952 1 ] Coil Flag 20Sep~08 2] Coil Flag 18,Sep-08 ~~~~~ Sir" ~. ~~- 200 C.~~ c 1 s~ S- bs I l ~ ~35~ i ~'i 6"- l~-~~ l ~OC7J~o ESE 50-029-21 91 1-01 3-07/L-29 EDE r..... ~~ 3-37/L-35 ~`; SrP 2 32~~8 Signed : Date _, Print Name: ~ ~ ~ ,`c_ (rte ~~ „~r~,~.~,..~ , PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99818 PHONE: (907)245-8951 FAx: (907f 245-88952 E-MAIL : pdsans;horageCa~memorviog.com wEBSITE : www.memorylog.com J C:\Documents and Settings\OwnerlDesktop\Transmit_BP.doc 09/18/08 Scb(u~6~rger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well _Inh ~F N0.4887 Company: State of Alaska Alaska Oil & Gas Cons Comm ~~::~~'~~~ ~~~ ~; ~~~~ Attn: ChristineMahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 1 .... n.. ..•:.... ~ n_._ M-04 11978480 MEM GRADIOMANOMETER LOG ~ ~~ 08/25/08 1 1r 14-32 12031498 LDL - 07/29/08 1 1 H-20 11962621 USIT ^` ~- ~( 08/28/08 1 1 3-35/L-36 11999039 INJECTION PROFILE ~ 09/04/08 1 1 3-37/L-35 11970845 FLUID LEVEL DETERMINATIONU t 09/07/08 1 1 3-37/L-35 11968960 PRODUCTION PROFILE 08/30/08 1 1 NK-38A 12017515 SBHP SURVEY ~~ _ ~ 09/02/08 1 1 L-215 12031512 INJECTION PROFILE 3 ~;~' '~ r 09/03/08 1 1 B-05B 12096914 MCNL 08/17/08 1 1 L-205L3 40016965 OH MWD/LWD EDIT 06/21/08 2 1 • ---• ~.... ,,cvc~r, v. v. ~~ar c~Wgi~~1~V V,JYG VVrT Clilifl IV: BP Exploration (Alaska) Inc. . "".~~ ,. I 'F ~ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. ., Anchorage, Alaska 99508 ~~"~:,.~ ~ ~ ~an~S Date Delivered: :~ fi~ rcle ` "~'~~ ~~`s, :, Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2 8 ATTN: Beth ~ Received by: !~,.i • ~~v~i v ~v ' STATE OF ALASKA ~''?'?~~~ ALA OIL AND GAS CONSERVATION COMI`~I~N~ L~~~ REPORT OF SUNDRY WELLn~C~'~~~~r~~ C:nmmissit7n 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate Other ~ CONV'T TO - C~C~t~@ Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver i e Extension ~ PRODUCER Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ~/' EXplOratOry 195-0510 3. Address: P.O. Box 196612 Stratigraphic Service ~' 6. API Number: Anchorage, AK 99519-6612 50-029-22554-00-00 . 7. KB Elevation (ft): 9. Well Name and Number: 56.01 KB 3-37/L-35. 8. Property Designation: 10. Field/Pool(s): ADLO-047503. ENDICOTT Field/ ENDICOTT OIL Pool - 11. Present Well Condition Summary: Total Depth measured 12600 ~ feet Plugs (measured) 12077' IBP 11-5-07 red) None true vertical 10488.22 feet Junk (measu pp t`~~:cd~9~ ~A~ ~ ~ 2Q~U Effective Depth measured 12590 feet true vertical 10465 feet Casing Length Size MD TVD Burst Collapse Structural 90' 30" Surface - 130' Surface - 130' Surface 5059' 10-3/4" 45.5# NT-80 Surface - 5100' Surface - 4343' 5210 2480 Production 12551' 7-5/8" 29.7# NT-95HS Surface - 12590' Surface - 10423' 8180 5120 Perforation depth: Measured depth: SEE ATTACHMENT - True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 SURFACE - 11875' 0 0 - Packers and SSSV (type and measured depth) 7-5/8"X4-1/2" TIW HB-1 PKR 11704' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: ~~ ~~y .~ ~ ~a~B 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 15764 550 2272 Subsequent to operation: 4136 5851 113 552 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~ Development ~~' Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~ Gas ~! WAG ~' GINJ ~' WINJ ~ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Pr le Title Data Management Engineer Signature Phone 564-4944 Date 5/19/2008 Form 10-404 Re sed 04/2006 ~ ~ ~ (~ ~ ~ ~ ~` Submit Original Only t S I~-~. 3-37/L-35 195-0510 PERF ATTACHMENT Wellbore: 3-37/L-35 MDT MDB TVDT TVDB 5/30/1995 8/21/1995 8/22/1995 9/1/1995 6/4/1998 6/15/1998 11/4/2007 11/5/2007 12,032 12,042 9943 9953 RPF 12,032 12,058 9943 9968 RPF RPF SQZ 12,032 12,062 9943 9972 PER SQZ 12,042 12,058 9953 9968 RPF 12,058 12,062 9966 9972 SQZ SQZ RPF 12,082 12,090 9991 9999 PER SQZ RPF SQZ BPS 12,305 12,335 10205 10234 APF BPS 12,335 12,365 10234 10263 APF BPS 12,365 12,395 10263 10292 APF BPS AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE 3-37/L-35 195-0510 • 3 - 37/L- 35 was converted to a gas I if t producer from n water injector on 12/31 /07 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Mike Bill Commissioner THRU: Tom Maunder DATE: November 16, 2002 Petroleum Engineer FROM: Lou Grimaldi Petroleum Inspector SUBJECT: Mechanical Integrity Tests BPX Endicott SDI 3-37/L-35 Duck Island Unit Endicott Field NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. w~,I ~-~,,~5 !~'~i.I ~ IT.V.~. I ~2~ I Tu~,~I 2~o I 2~o I 2~o I 2~o ],nterval ..P.T.D.I 195-05101Typetest] P ]mestpsi] 2407 ]Casing] 1100 ] 2750 ] 2725 ] 2710I P/F I I Type ,nj.I I -,-.v.o. I I Tubing I I I I I IntervaII I Type testI I Test psiI I Casing I I I I I P/F I I Notes: Well "p.T.D. Type I NJ. Fluid Codes Type Test Interval F = FRESH WATER INJ. M= Annulus Monitoring I= Initial Test G = GAS INJ. P= Standard Pressure Test 4= Four Year Cycle S = SALT WATER INJ. R= Internal Radioactive Tracer Survey V= Required by Variance N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover D= Differential Temperature Test O= Other (describe in notes) Test's Details I stood by after SVS tests on Endicott SDI row 3 to witness an MIT on well # 3-37/L35. Mark Sauve (Endicott engnr) conducted the test this evening. The well was pressured up and exhibited good integrity throughout the test. I recommend the well for continued injection. M.I.T.'s performed: One Number of Failures: None Total Time dudng tests: 3 hours Attachments: None cc: DEC I ~ 2002 MIT report form 5/12/00 L.G. MIT DIU SDI 3-37 L-35 11-16'02 LG.xIs 12/3/2002 OP-. BEF ORE STATE OF ALASKA ALA"--' OIL AND GAS CONSERVATION COMMIS .... ;'N REPORT SUNDRY WELL OP,-RATIONS .. Operations performed: Operation shutdown_ Stimulate__ Plugging m Pull tubing__ Alter casing ~ Repair well__ Perforate__ Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora.c/e, Alaska 99519-6612 4. Location of well at surface 2773' NSL, 670' WEL, SEC. 8 T11N, R17E At top of productive interval 1782' NSL, 3093' EWL, SEC. 4 T11N, R17E At effective depth 1982' NSL, 3109'EWL, SEC. 4 T11N, R17E At total depth 1900' NSL, 3198' EWL, SEC. 4, T11N, R17E 5. Type of Well: Development __ Exploratory .__ Stratigraphic __ Service .. 6. Datum elevation (DF or KB) 56' KB feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 3-37/L-35 9. Permit number/approval number 95-51/398-158 10. APl number 50- 029-22554 11. Field/Pool Endicott Field/Endicott Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 12600' feet Plugs (measured) 10474' feet BKB 12509' feet Junk (measured) 10465' feet BKB Length . Size Cemented 90' 30" Driven 5059' 10-3/4" 700sx PF 'E', 650sx 'G' 12551' 7-5/8" 450 sx Class 'G' measured 12032'-12062'; 12082; 12090' (squeezed) 12305'- 12395' (open) true vertical (Subsea) 9887; 9916'; 9935'-9943' (squeezed) 10149'- 10236' (open) Tubing (size, grade, and measured depth) 4-1/2" 12.6#/ft, L-80 NSCT to 11875' Measured depth True vertical depth BKB BKB 130' 130' 5100' 4343' 12590' 10423' Packers and SSSV (type and measured depth) 7-5/8" TIW "HB-BP-I" @ 11704', HES 'HXO' SVLN (3.813" MIN. ID) w/SSSV MIN I.D./s2.0" 'i V 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 8342 1899 Subsequent to operation 15392 1971 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 16. Status of well classification as: Oil.. Gas__ Suspended.. Service W~tp.r In.i¢c..t_ ~r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ! Signed ~t~..~/%_ /~'~~~ Title Techni~.~tZt.~.~i_~t~nt IV Tel- i' Form 10-404 Rev 0~/15/88 Date 10/02/98 ~ SUBMIT IN DUPLICATE ,,,~ BPX Endicott Production Engineering Department DATE: 9/12~98 WELL N°: 3-37/L-35 BP EXPLORATION REP: D. Williams SERVICE COMPANY: APC MIT INNER ANNULUS DATE/TIME OPERATIONS SUMMARY 1430 1445 1500 1530 1600 RIG up Tri-plex & PT lines to 3000 PSIG. Pump methanol down IA and pressure up to 2550 PSI. Monitor for 30 minute, pressure dropped off 50 psi in 30 minites test good. Rig down Tri-plex. IA bled down to 350 psi. SUMMARY: * Pumped 3 bbls of 60~40 meth. · Pumped IA up 2550 psi lost 50 psi held 2500 for 30 mins. Good test. BPX Endicott Production Engineering Department MIT WITH STATE WITNESS DATE: 10~2~98 WELL N°: 3-371L-35 BP EXPLORATION REP: C. Lovelace SERVICE COMPANY: HB&R DATE/TIME OPERATIONS SUMMARY 1745 1757 1827 FP=2100 IA=1150 OA=680 MIRU HB&R. PFF to 3000 ps~. , Pump 3 bbls of diesel down I/A & Pressure up to 2500 psi. RDMO. Monitor for 30 min. Passed MIT. Bleed back to 250 psi. FP= 2100 IA=250 OA=680 SUMMARY: * Pump a total of 3 bbls of diesel. Passed MIT. * Witnessed by AOGCC REP. Lou * I/A =250 psi O/A =680 psi FWHP = 2100 psi STATE OF ALASKA AL,~"~A OIL AND GAS CONSERVATION COMMI' -"~N REPORT SUNDRY WELL OP 'RATIONS ,. Operations performed: Operation shutdown __ Pull tubing ~ Stimulate __ Plugging__ Perforate__ Alter casing __ Repair well__ Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora.c/e, Alaska 99519-6612 4. Location of well at surface 2773'NSL, 670' WEL, SEC. 8 T11N, R17E At top of productive interval 1782'NSL, 3093' EWL, SEC. 4 T11N, R17E At effective depth 1982' NSL, 3109'EWL, SEC. 4 T11N, R17E At total depth 1900' NSL, 3198' EWL, SEC. 4, T11N, R17E 5. Type of Well: Development .. Exploratory __ Stratigraphic __ Service __ 6. Datum elevation (DE:'.,.OSl~..ge 56' KB feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 3-37/L-35 9. Permit number/approval number 95-51~not rec/uired 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12600' feet Plugs (measured) 10474' feet BKB 12509' feet Junk (measured) 10465' feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 90' 30" Driven 5059' 10-3/4" 700sx PF 'E', 650sx 'G' 12551' 7-5/8" 450 sx Class 'G' measured 12032'-12062'; 12082'- 12090' (squeezed) 12305'- 12395' (open) true vertical (Subsea) 9887'- 9916'; 9935'-9943' (squeezed) 10149'- 10236' (open) Tubing (size, grade, and measured depth) 4-1/2" 12.6#/ft, L-80 NSCT to 11875' Measured depth BKB 130' 10. APl number 50- 029-22554 11. Field/Pool Endicott Field/Endicott Pool True vertical depth BKB 130' 4343' 10423' 5100' 12590' Packers and SSSV (type and measured depth) 7-5/8" TIW "HB-BP- 1" @ 11704', HES 'HXO' SVLN (3.813" MIN. ID) w/SSSV MIN I.D. is 2.0" 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure see attached ops reports- MIT(8~17~98 and8~19~98) Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure -361 7691 0 Tubing Pressure 339 14. 16. Status of well classification as: Oil X Gas~ Suspended Service Prior to well operation 39 Subsequent to operation n/a Date 09/03/98 SUBMIT IN DUPLICATE 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/8~ BPX Endicott Production Engineering Department DATE: 8/19~98 WELL N°: 3-37/L-35i TYPE OF OPERATION: BP EXPLORATION REP: SERVICE COMPANY: Operations Report MIT on Tubing Hanger Seals Lovelace APC TIME OPERATIONS SUMMARY 1600 1620 SIP=1375 IA=1150 OA=300 TEST HANGER SEAL PRESSURE UP TEST PORT AREA BETWEEN THE LOWER WELL HEAD TUBING SEAL AND HANGER SEAL TEST HANGER SEAL TO 300 PSI FOR 15 MINUTES--TEST GOOD Summary: Tested the hanger seals to 3000 psi for 15 minutes, Good BPX Endicott Production Engineering Department DATE: 8/18~98 WELL N°: 3-37/L-35 TYPE OF OPERATION: BP EXPLORATION REP: SERVICE COMPANY: Operations Report MIT Lovelace APC ^ &.f, TIME 0720 O745 0837 0837 0908 1020 1023 1055 Rig up and pressure test to 3000 ps~ SIP=1150 IA=975 OA=225 Begin Pumping Sea Water at 5 BPM Pump 260 bbls Sea Water Begin Pumping Diesel, 5 bbls minute Pump 40 bbls of Diesel Shut Down - Wire line set GLV in pocket Pump 3 bbls of Diesel pressure IA to 1000 ps~ Watch pressure for 30 Minutes TEST GOOD Bleed of IA to 650 ps~ SIP=11501A=650 OA=300. Rig Down Summary: Pumped 260 bbls of Seawater and pumped 40 bbls of Diesel into inner annulus after wireline set GLV pressured IA to 1000 psi for 30 minutes. STATE OF ALASKA ALAS; )IL AND GAS CONSERVATION COMMISS : 4 REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate__ Plugging__ Pull tubing__ Alter casing __ Repair well Perforate X Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora.qe, Alaska 99519-6612 4. Location of well at surface 2773' NSL, 670' WEL, SEC. 8 T11N, R17E At top of productive interval 1782' NSL, 3093' EWL, SEC. 4 T11N, R17E At effective depth 1982' NSL, 3109'EWL, SEC. 4 T11N, R17E At total depth 1900' NSL, 3198' EWL, SEC. 4, T11N, R17E 5. Type of Well: Development .. Exploratory __ Stratigraphic __ Service .__ 6. Datum elevation (DF or KB) 56' KB feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 3-37/L-35 9. Permit number/approval number %,, 95-51~not required 10. APl number 50- O29-22554 11. Field/Pool Endicott Field/Endicott Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 12600' feet Plugs (measured) 10474' feet BKB 12509' feet Junk (measured) . 10465' feet BKB Length Size Cemented 90' 30" Driven 5059' 10-3/4" 700sx PF 'E'. 650sx 'G' 12551' 7-5/8" 450 sx Class 'G' measured 12032'-12062'; 12082'- 12090' (squeezed) 12305'- 12395' (open) true vertical (Subsea) 9887'- 9916'; 9935'-9943' (squeezed) 10149'- 10236' (open) __ Tubing (size, grade, and measured depth) 4-1/2" 12.6#/ft, L-80 NSCT to 11875' RECEIVED JUL 09 1998 Naska 011 & Gas Con~. Commission Measured depth Anch°rag°rrue vertical depth BKB BKB 130' 130' 5100' 4343' 12590' 10423' Packers and SSSV (type and measured depth) 7-5/8" TIW "HB-BP-I" @ 11704', HES 'HXO' SVLN (3.813" MIN. ID) w/SSSV MIN I.D. is 2.0" 13. Stimulation or cement squeeze summary Squeeze (6/4/98) in preparation for up-coming WI conversion, Add Perforations (6/15/98) in preparation for up-coming W1 conversion Intervals treated (measured) 12,305'- 12,395' (perforated); 12032'-12062'; 12082'- 12090' (squeezed) Treatment description including volumes used and final pressure see attached. 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation 170 -250 4085 0 Subsequent to operation 39 -361 7691 0 Tubing Pressure 361 339 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas__ Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed !~ ~ ~ ~.~u¢~~ Title T~chnic~l ~t.sistent IV Form 10-404 Rev 06~15/88 Date 7/08/98 SUBMIT IN DUPLICATE ENDICOTT, ALASKA TO: FROM: Well Name: Main Category: Sub Category: Operation Date: Endicott Prod. Engr. L. Phong 13-37 / L35i ~o'"st Sqz Perfs and IStatic 16114-15/98 Date: [6/15/98 Job ID# N/A ~.'~ ' _~L. Cost Code: N10337-120 Objective: To Perforate from 12,305' to 12,395', Then Run a Static Pressure Survey. OPERATIONS SUMMARY: MIRU SWS. RIH. Tie In. Successfully Shot Perforations from 12,365' to 12,395', 12,305' to 12,335', and 12,335' to 12,365'. All Shots w/SWS 3 3/8" Deep Penetrating RDX Hollow Carrier Guns at 4 SPF, 60/120 Degrees Phasing, Random Orientation on SWS' Safe System. RDFN. RU SWS. RIH. Tie In. Log Static Passes. RD. Inspect Site. MO. FIELD INTERPRETATION: MD (ft) TVD (ft ss) Temp (Deg. F) Press (psia) Duration (sec) t 2,045.1' 9,900' 202.87 4135.57 1829.5 12,149.3' 10,000' 213.14 4179.94 1813.37 12,253.6' 10,100' 219.57 . 4223.17 1843.50 12,149.3' 10,000' 213.09 4180.17 3660.56 Initial Well I SIWHP lAP CAP Status (psi) (psi) (psi) I 2ooo 5oo TIME OPERATION 0700 MIRU SWS #3441. 0830 Inform Well Tender and Control Room of Work. Safety/Spill Meeting. Appoint Mike Minogue as Spill Champion. 0910 Arm 30' 3 3/8" Deep Penetrating RDX Hollow Carrier Guns at 4 SPF, 60/120 Degrees Phasing, Random Orientation on SWS' Safe System. 0930 RIH. 0950 CCL Powered Up. Good Collar Response. 1105 Log Tie In Pass while RIH wi AWS Jewelry Icg 5/30/95. 1120 Log Up. Confirm On Depth. Shoot 12,365' to 12,395' w/SWS 3 318" Deep Penetrating RDX Hollow Carrier Guns at 4 SPF, 60/120 Degrees Phasing, Random Orientation. Positive Confirmation of Shots off, Lost 100#, Felt/Heard Shots at Wellhead, and Saw Tool Short. No Change in SIWHP. Log Up 3 Collars. 1140 POOH 1245 CCH. Inspect Guns, All Shots Off. 1305 Arm 30' 3 3/8" Deep Penetrating RDX Hollow Carrier Guns at 4 SPF, 60/120 Degrees Phasing, Random Orientation on SWS' Safe System. Call Well Tender to Open Wing. 1345 RIH. Well Tender Crack Open Wing Valve to Limit Drawdown. SIWHP Decreased to 1900#. 1400 CCL Powered Up. Good Collar Response. 1455 Log Tie In Pass while RIH wi AWS Jewelry Icg 5/30/95. 1515 Log Up. Confirm On Depth. Shoot 12,305' to 12,335' w/SWS 3 3/8" Deep Penetrating RDX Hollow Carrier Guns at 4 SPF, 60/120 Degrees Phasing, Random Orientation. Positive Confirmation of Shots off, Lost 200#, Felt/Heard Shots at Wellhead, and Saw Tool Short. No Change in SIWHP. Log Up 3 Collars. 1525 POOH. 1645 CCH. Inspect Guns, All Shots Off. SIWHP Inc to 1925#. 1725 Arm 30' 3 3/8" Deep Penetrating RDX Hollow Carrier Guns at 4 SPF, 60/120 Degrees Phasing, Random Orientation on SWS' Safe System. 1735 RIH. 1750 CCL Powered Up. Good Collar Response. Call Well Tender to Open Wing. 1845 Well Tender Crack Open Wing Valve to Limit Drawdown. SIWHP Decreased to 1620#. 1900 Log Tie In Pass while RIH w/AWS Jewelry log 5/30/95. 1925 Log Up. Confirm On Depth. Shoot 12,335' to 12,365' w/SWS 3 3/8" Deep Penetrating RDX Hollow Carrier Guns at 4 SPF, 60/120 Degrees Phasing, Random Orientation. Positive Confirmation of Shots off, Lost 150#, SIWHP slowly inc to 1700#, and Saw Tool Short. Log Up 3 Collars. 1935 POOH. 2055 OOH. Inspect Guns, All Shots Off. 2110 Inform Well Tender and Control Room of Plans to RDFN. SIWHP = 1700#. 2120 Inspect Site. RDFN. 6/14/98 0800 RU SWS #3441. SIWHP = 1685#. 0825 Inform Well Tender and Control Room of Work. Safety/Spill Meeting. Appoint Bryan Seavey as Spill Champion. 0845 RIH w/CPLT 0945 Log Tie In Pass while RIH w/AWS Jewelry log 5/30/95. Log Up. Confirm On Depth. 1000 Log Static @ 9,900' TVDss, 12,045.1' MD per Gyrodata Directional Survey 5/29/95. 1040 Log Static @ 10,000' TVDss, 12,149.3' MD per Gyrodata Directional Survey 5/29/95. ~1130 Log Static @ 10,100' TVDss, 12,253.6' MD per Gyrodata Directional Survey 5/29/95. 1215 Log Static @ 10,000' TVDss, 12,149.3' MD per Gyrodata Directional Survey 5/29/95. 1325 Data Looks Good. POOH. 1405 OOH. Inform Well Tender and Control Room of Job Completion and Well Status (Well left sShut In). 1430 MO. Final Well I SIWHP lAP OAP Status (psi) (psi) (psi) II 685 5oo 18o To: Anchorage Engineering From: Powers Operation: 3-37 Squeeze for WI conversion Date: 6/4/98 Summary BH kill well with 376 bbls ofSW. RIH with 3.0" combo nozzle. Dry tagged TD at 12,448' and did not correct depth. PUH and flagged pipe at 12,150'. Cooled liner with 124 bbls of water. Pumped 5bbls of xylene/10 bbls of 15% DAD acid/5 bbls ofxylene. Pre acid injectivity was 2 bpm at 760 psig. Over displaced acid with 50 bbls of water. Post acid injectivity was the same. Pumped 12.5 bbls of cement from 12,150'. Opened chokes at 1500 psig and 6 bbls out nozzle. Laid in remaining cement while ramping pressure to 3000 psig. Not much cement got behind pipe. Held 3000 psig on squeeze for 45 mins. Jetted out cement with 35 bbls ofbiozan. Jetted liner with slick SW to a depth of 12,440'. Laid 10 bbls of TEA in liner across perforations. Jetted tubing and jewelry while POOH. FP 1600' of tubing with methanol. Final PT was JFK at 620 psig. <1 bbl of cement behind pipe C/O to 12,440' CTMD (psig) (psig) (psig) (psig) (deg F) (psig) 2241 I 250 I 100 [ 300 I 104 I [ I Time I Operation 7:30 AOL. DS#6 14,640' of 1.75" coil. CTV=33.4 bbls 7:45 PT lubricator and hard line 7:56 Recover methanol 8:19 Open up well 8:21 Begin BH kill (ft) (bpm) (psig) (psig) (bbls) (bbls) 9:15 surf 4.7 1540 1680 250 Slow rate and RIH 9:26 500 1.0 700 1340 277 Totalizer on pump is off a bit. 10:07 5000 1 720 1455 316 8.5K up wt. 11:04 11650 1 690 1370 370 19.8K up wt 11:11 12050 1/0 600 575 376 SD for dry tag. 11:17 12448 0/1 320 330 356 21K off bottom. Did not correct depth. 11:24 12150 1.9 780 3170 370 Flag pipe. 11:43 2 875 1800 424 Recipe to tail pipe. 12:02 11850 2 830 1760 460 RIH to flag 12:12 12150 2/1 655 850 481 Safety meeting. 12:32 0 497 SD to PT cementers 12:40 0/2 330 340 500/0 SW to xylene 12:42 12137 2.2 730 1950 5/0 SW to 15% DAD acid 12:47 12075 2.1 750 2861 10/0 SW to xylene 12:49 12050 2.1 760 3100 5/0 SW to SW 12:56 12025 2 770 3540 13 Xylene at nozzle 13:08 11990 2.1 641 2484 40/0 SW to FW 13:13 12050 1 640 1230 10/0 SW to cement 13:21 12125 1.9 650 3400 12.5 SW to FW 13:24 12090 1.9 700 3280 5/0 SW to SW 13:32 12150 1.9 770 3000 17 Cement at nozzle 13:34 1.9/1.3 875 1400 20 PUH 13:37 12075 1.3 1500 1750 23 Open chokes and begin gauging 24 1.5 25 2.5 Go to 2000 1850 26 3 "'13:40 11950 1.3 2000 2470 27 3.75 11910 2000 2520 28 4.5 29 5.5 PLF. Go to 2500 psig 13:45 11600 1.3 2500 3100 33 8 At safety. '13:46 0 3030 3020 34 8.75 SD and trap pressure 14:24 3032 3000 34/0 Bleed down to jet out cement 14:32 0/2 545 780 Start on biozan and drop ball 14:52 11860 2 500 2400 34 Biozan at nozzle. SW to SW 14:56 12025 1.5 480 2100 6 Slow rate through perfs 15:00 12120 1.5/2.4 550 3300 18 Increase rate to jet sump 15:06 12440 2.8 550 3200 31 Jet up 15:16 12130 3/1.5 530 2300 55 Slow down through perfs 15:21 12000 1.5/3 530 2800 65 Increase rate '15:26 11800 3 530 3044 80 Jet down 15:31 12000 3/1.5 95/0 Slow rate for perfs and SW to TEA "15:38 12150 1.5 10/0 SW to SW and increase rate 15:44 12440 2.6 500 2780 12 Jet up 15:50 12150 1.5 34 Lay in TEA across perfs 16:57 12000 2.5 512 2670 46 Increase rate and jet jewelry. Gel at surface 17:02 3700 3/2 540 2300 218/0 SW to methanol 17:16 1950 2 530 3500 28/0 SW to water 17:20 1600 2 510 3500 6 FP tubing 17:33 surf 0 630 645 30 SD and PT squeeze 630 JFT. RDMO (psig) (psig) (psig) (psig) (deg F) (psig) 630 I 250 I 100 I 300 I 110 I I bbls Fluids Summary 420 SW 463 Slick SW 10 Xylene 10 - 15% HCL/10%xylene 15 FW 12.5 Cement 35 Biozan 12 TEA 28 Methanol BHA # 1 Tool String Description OD ID Length Comments DS connector. 2.25 .... 0.15' Squeeze nozzle 3.0" 0.58' 0.73' Total Length Cement Details Lab Data - Pilot Test 15.6 PPG, Lafarge Latex Cement D020 1.000 %BWOC D065 0.300 %BWOC D800 0.700 %BWOC M117 0.300 %BWOC D047 0.100 GAL/SAC D600 1.000 GAL/SAC D135 0.100 %BWOC API Fluid Loss = 74 ml Filter Cake -- 0.87" Thickening Time = 6hr 45mins (inc. 2hrs surface time) Field Test APl Fluid Loss = 81 ml Filter Cake = 0.93" Density = 15.6 BP EXPLORATION July 7, 1998 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Wondzell, Attached in duplicate are the 10-404 forms for Sundry Operations for a WSO/Cement Cap on well 1-19/I-18 and a MIT on well 3-7~ in the Endicott Reservoir. Due to an' inadvertent oversight during training/hand-over responsibilities, these two reports are being filed later than the 30-day reporting requirements. Regarding the MIT on well 3-37/L-35, in the recent approval (No. 398-158) to convert this well from a producer to an injection service well, a condition for an MIT test was attached. As an MIT was completed (see Sundry attached here) on May 17, 1998, will AOGCC require another MIT subsequent to the conversion of the well? If there are any questions, please contact me at 564-5234. Sincerely, Madelyn A. Millholland Technical Assistant IV MAM Enclosure cc: File: 76.13 ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT C SUNDRY WELL OP["-':ATIONS ~,erations performed: Operation shutdown __ Stimulate__ Plugging__ Pull tubing__ Alter casing __ Repair well Perforate.__ Other X 2. Name of Operator BP Exit/oration (Alaska)/nc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2773' NSL, 670' WEL, SEC. 8 T11N, R17E At top of productive interval 1782' NSL, 3093' EWL, SEC. 4 T11N, R17E At effective depth 1982' NSL, 3109'EWL, SEC. 4 T11N, R17E At total depth 1900' NSL, 3198' EWL, SEC. 4, T11N, R17E 5. Type of Well: Development .. Exploratory __ Stratigraphic Service 6. Datum elevation (DF or KB) 56' KB feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 3-37/L-35 9. Permit number/approval number 95-51/not recluired 10. APl number 50- 029-22554 11. Field/Pool Endicott Field/Endicott Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12600' feet Plugs (measured) 10474' feet BKB 12509' feet Junk (measured) 10465' feet 8KB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 90' 30" Driven 5059' 10-3/4" 700sx PF 'E', 650sx 'G' 12551' 7-5/8" 450 sx Class 'G' measured 12032;12058; 12082; 12090' (open) 12058'- 12062' (squeezed) true vertical (Subsea) 9887; 9912'; 9935;9943' (open) 9912; 9916' (squeezed) Tubing (size, grade, and measured depth) 4-1/2'; 12.6#/ft, L-80 NSCT to 11875' Measured depth BKB 130' 5100' 12590' True vertical depth BKB 130' 4343' 10423' ORIGINAL Packers and SSSV (type and measured depth) 7-5/8" TIW "HB-BP-I" @ 11704', HES 'HXO' SVLN (3.813" MIN. ID) w/SSSV MIN I.D. is 2.0" ' ~ ~- "~ ~""""'~-' "~i:~;';~"'" .... 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure _ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 170 -250 4085 0 39 -361 7691 0 Tubing Pressure 361 339 15. Attachments Request to convert from Copies of Logs and Surveys run __ Daily Report of Well Operations × 16. Status of well classification as: Oil × Gas__ Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~]ned f~\l'\O~ ~ ~,. ~r"~~ Titlesenior T, c. hnicalAs~i.~tantlV Form 10-404 Rev 06fl[~;/88 Date 7/08/98 SUBMIT IN DUPLICATE BPX Endicott Production Engineering Department DATE: 5/17/98 WELL N°: 3-37/L-35 TYPE OF OPERATION: BP EXPLORATION REP: SERVICE COMPANY: Operations Report MIT Lovelace APC TIME I OPERATIONS SUMMARY 1610 I Rig up and pressure test to 3000 psi SIP=2250 IA=125 OA=0 1615 I Begin Pumping Diesel at 3 BPM 1634 I Pump 50 bbls Diesel 1637 I Begin Pumping Sea Water 2.5 bbl minute 1705 I Pump 73 bbls of Sea Water I Shut Down and watch pressure for 30 Minutes J TEST GOOD 1737 i Bleed of IA to 300 psi J SIP=22501A=300 OA=0. Rig Down Summary: Pumped 50 bbls of Diesel into the inner annulus and held 2500 psi for 30 min. then bled back to 300 psi ' 98 08:30RH ]~P× EHDTCOTT ~F"9~" ur ~L~or~-~ ALA.'-~-~t OIL AND GAY CONSERVATION COMMISSI' ' -~ ' 'APPLICA', _,3N FOR SUNDRY APF r OVALS P.4/4 1. Type of Request: Abandon__ Suspend. .. O~mtion Shutdown ~ Re-enter suspended well ~ Alter casing __ Repair well ~ Plugging ~ Time extension __ S~lmula~e .~ ~nge app~ prog~m ~ ~11 ~bing ~ Vaflan~ ~ Pedor~te ~ O~er x 2. Name of Operator BP Exploration (Alaaka.,).,/nc, 3. Address P. O. Box 196612, A. ..n.,,~hora.cle, Alaska 3951~-6612 4. Location of well at surface 2773' NSL, 670' WEL, SEC. 8 T11N, R17E At top of productive interval 1782' NSL, 3093' EWL, SEC. 4 T 11N, R 178 At effective depth 1982'N,SL. 3109'EWL, SEC. 4 T11N, R17E At total depth 1900'NSL, 3198'EWL, SEC. 4, T11AI, R17E 12. Present well condition summary 5. Type of Well: Development EXploratory Str~grephi~ 6, Datum elevation (DF or KB) 56'KB 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 3-37/I.-35 9. Permi, t~umber 10. APl number feet Total depth: measured true vertical Effective depth: measured true vertical Casing Structural 12600' feet Plugs (measured) 10474' feet BKB 12509' feet Junk (measured) 10465' feet BKB Length Size Cemented 11. Field/Pool Endicott Fi~d~/F~d?co~.__Pool Conductor Surface Intermediate ~059' 10-3/4" ?OOsx PF 'E', 650sx 'G' Jaska Oil & Gas Cons. Commissfor Measured d~ True vertical depth BKB Production Liner Perforation depth: 1£551' 7-~/8" 450 ex Class 'G' measured 12032'-1205~; 12082'- 120~0' (open) 12058'. 12062' (~queezed) 5100' 4343' true vertical ($ubsea) 9887- ~9127 9935'-9943' (open) 9912'.- 9916' (squeezed) Tubing (size, grade, and measured depth} 4-1/2" 12.6#/ft, L.80 NSCT to 1187~' 125~0' 10423' ORIGINAL Packers and SSSV (type and measured depth) 75/8" TIW "HB-BP-1" @ 11704', HE$ 'HXO' SVLN ($.813" MIN. ID) w/$SSV MIN I.D. is 2.0" 13. A~t'~chments Descdption'summary of proposal X Detailed operations program Request to convert from ~roduc. l~,w, ell to injection service well att_a, ched 14. Estimated date for commencing operation I 15. Status of well classification as: ...M_av 18, 1998 ! , .. 16. If proposal was verbally approved I Oil X Gas ~ Suspended __ Name of approver Date approvedJ Service ~'-[-.~' 17. I hereby certify that the fo'r,~oing is true and correct to the b'e~t of my knowledge. '-" ..Signed - Title 5'-P_T /%/~/~./,~ ~c,,_~,;;,,,~,,,,. Date 6117/98 ~ FOR'C~MMI$$10N USE ONLY .... ~-o~ditions of approval: Notif,, ~:~or~,-;ssion so repre.~entative may witness Plug integrity~ BOP T/est Location clearance Mechanical Integrity Test v' Subsequent form required 10- I Approval No..~ ~,~-- Approved by order of the Commission ORIGINAL SIGNED BY Form 10-403 Rev 06/15/88 Robert N. Christenson Commissioner SUBMIT IN TRIPLICATE BP EXPLORATION BP Exploration (Alaska), Inc. FAX MESgAGE Endlr. x~ Buslne~e Unit goo E. I~.nm]n Blvd. P.O. ~X 1~12, MBT-1 Ane~, ~e~ ~1~612 Central ~ (~~1 Team: Endicott Asset Group / Tel: 1-(907)-564~337 Fax No: 1-(907)-5~-5200 URGENT [---') ORDINARY ['--'] CONFIDENTIAL Copy To: Me_ssaqe:: '¸ 98 08:2~ BP× £~DI~TT P,E/4 BP EXPLORATION June 17, 1998 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. B. Wondzell Dear Mr. Wondzell Attached please find an Application for Sundry Approval for Endicott SDI injection well 3-37/L-35, The well is currently shut in awaiting surface hook-up to the water injection manifold, BP requests that a conversion to water injection be approved, Well 3-37/L-35 was originally drilled as a zone 2A injector in 1995 but was pre- produced from zone 3A for three years before the decision to convert to water injection was made, Please feel free to contact myself at 564-5407 or Graham Stewart at 564-5853 if you require additional information regarding the proposed course of action, Sincerely, Mark Sauve Endicott Development Group attachments (2) MAS/mas e-mail: D. Szabo K. Coyne E. Goebel D. Singleton END-Production Coordinator END PE-Sup xc: 3-37/L-35 Well File ORIGINAL JUN 1 8 1998 Alaska 0il & Gas Cons, O~ion '98 08:29RM BPX ENDICOTT DEVP .,= P.3/4 SUNDRY APPLICATION FOR CONVERSION ENDICO'I-I' POOL WELL 3-37/L-35 June 17, 1998 Background Well 3-37/L-35 was drilled and completed in May 1995 as a zone 2A water injector. However, an oil column was found in zone 3A and it was decided to produce out these 3A reserves prior to turning the well over to zone 2A water injection. The 3A sands have proven to be more productive than originally anticipated and it has taken approximately three years to adequately recover the 3A reserves. Recommendation With 3A production from well 3-37/L-35 dropping off and recent changes made to the 2A offtake strategy the conversion of well 3-37/L-35 to 2A water injection now appears to be the best use of the wellbore, We request that a conversion of well 3-37/L-35 from 3A production to 2A water injection be approved. ORIGINAL ~98 O£:~PH BP× E~DI~T~ DEYP~ ~TATE OF ALASKA ALA~,' ~'~OIL AND GAS CONSERVATION COMMI$~IO; APPLICA'; ,ON FOR SUNDRY APPHOVALS 1. Type of Request: Abaddon~ Suspend Allot casing ~ Repair well Change approved program Name of Operator '" BP Ex~)loratlon (.A. laska) Inc. Address P. O. Box 198612, Anchorage, Alaska 9951~-6612 . .. Operation Shuldown ~ Re-enter suspended well _ .. Plugging ~ Time exlension _ Stimulate ~ Puli tubing Variance Perforate Olher x B. Type of Well: Development x E~loratory ~ Stratlgraphlc Service 4. Location of well at surface 2773'NSL, 670' WEL, SEC. 8 T11N, R17E At top of productive Interval 1782' NSL, 3093' EWL, SEC. 4 T11N, R12'E At effective depth lg8£' NSL, 3109'EW1_, SEC. 4 T11iV. R17E .At total depth I900' NSL, 3198'EWL., ,SEC. 4, T17N, R17E 2.'~resent well condition summary P.2/? 6. Datum elevation (DF or KB) 5~' KB 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 3-37/L.35 9. Permit number 10. APl number 50-029-22554 11, Field/Pool End/coif Pie/d/Endicott Pool feet Total depth: measured true vertical Effective depth; measured true vertical 12600' feet Plugs (measured) 10474' feet BKB f2509' feet Junk (measured) 10485' feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 5059' 10-3/4' 700ex PF 'E', 650eX 'G' 12551' 7-5/8' 450 ,ex Class 'G' measured 12032'-12058; 12082'- 12090' (open) 12058'- 12062' (squeezed) true vertical (Subsea) 9887'- ~91£'; 9935'-9943' (open) 9912'- 9916' (squeezed) Tubing (size, grade, and measured depth) 4-1/2" 12.6#/ft, L-80 NSCT to 11875' Measured (~¢Kp~ True vertical depth BKB 5100' 4345' Packers and SSSV (type and measured depth) 7-5/8" TIW 'HB.BP-I" @ 11704', HE$ 'HXO' SVLN (3.813" MIN. ID) w~~V MIN I.D. !~ 2.0" 13. Attachments Description summary of proposal -,X--.. Detailed operations program BOP sketch ~ ReQuest to convert,from ~roducin¢l well to injection service w~, l_l attached 14. Estimated date for commencing operation ~ 15. Status of well classification as: May 18, 1998 16. If proposal was verbally approved Oil ~ Gas __ Suspended __ Name of approver Date approved Service ... 17. I hereby c. ertlfy that ~he foregoing is true and correct to the be~t of my knowledge. · - '7 / U- FoR COMMISSION eSE'ONLY ~.,/-- Dat__e _5/5/98 Conditions of approval: II[oflfy C0~misslon so representative rna~ witness Plug integrity BOP T. est Location clearance Mechanical Integrity Test. p'/ Subsequent form required 10-/¢O ~ -- Approved by order of the Commission Form 10-403 Rev 06/15/88 ~jI''''~ David W. ,Johnston , Commissioner Date ~..~_-"""//--- ~ SUBMIT IN TRIPLICATE Jd' 98 02:47PM BP× ENDICOTT DEVP P.3×? REQUEST TO CONVERT WELL 3-37/L-35 FROM PRODUCER TO INJECTION SERVICE WELL The following is a request to proceed with the conversion of well 3-37/L-35 to injection service. This well was drilled as a pre-produced 2A injector in May 1995. The well encountered oil in the 3A2 and produced 800MSTB from this sand before it was shut in for high water cut in February 1998. The original intent of this well was as a 2A injector; therefore, it is optimally placed to support updip voidage from wells 3-39AJI- 37, 4-38/K-34, and 3-03/J-33. The conversion of 3-37/L-35 to injection will optimize the current 2A waterflood by replacing 2,A injection from well 3-07/N-28 on the Northwest periphery and relocating it to a more suitable location in the central SDI. Well 3-37/L-35 was originally approved as a pre-produced injector in March 1995. At the time of approval, the associated benefits for this operation were estimated at 3.1 MMSTB of oil in the SDI 2A through improved waterflood management. Well 3-37/L-35 has been on producer status from May 1995 to the present. During this time the 2A wellset has changed considerably. Well 3-15/K-33 is no longer a 2A producer and the focus of 2A production has shifted to the northern tier of 2A wells 3-031J-33.4-38/K-34 and new infill well 3-39A/I-37. Although the previously estimated benefits of 3.1 MMSTB due to the conversion of well 3-37/L-35 to injection would be considered the high side case, enhancements in local sweep efficiency and a change in the injector/producer flux lines are expected provide an incremental increase in the ultimate recovery from this northern tier of wells. The primary benefits of increasing 2A water injection to the northern tier will be a reduction in GOR in offset wails 3-03/J-33 and 4-38/K-34. As illustrated by the time lapse CNLs in the 2B in well 4-38/K-34, significant changes in injection management strategy in de-pressurized zones are effective in mobilizing unswept oil to upstructure offtake points. In addition, 3-37/L-35 will provide pressure support for offset well 3~39A/I-37 which is currently producing at a gross fluid rate of 10,000 STB/D. P E R H I T 95-'-05i 95 - (351 o5-051 95v-.05 I 95-051 95 .... 051 95-05 i 95 --- 05 'i 95---051 q<.. 5-'~ 051 95 .... 05 i 95---051 AO,SCC; Ind'i ',,,'-i'dua] ',,te I i Geoiog~ca] kla-l:..ei-'"*fals Inven'tor"y DATA T DATA_P!..IJS BH/f:"RC;,f:ILE '.L 11070'-12535 DtFl.../,cdR ,;. L. 1i070 .... i257'i FHI'/GR/FINAL ;~ E-' 1204.2-'-'i.'2/..,13 S:.;--!;VD,/F'INAL L 11070-12571 ZDL/CN/'GR ~_ L 11070-1253`5 ,.SR/PERF ?L 11510 .... 'i2'i50 ,;,', ~ ~-; PFC/'PERF ~__L." i1510-i2i50 < ",,? .... ~ .": ' S B T,/,.Si R . .L 1 I 74. 5 --. 1274- 2 PROD PROFZLE ,._t... 11900..-i2200 G R/" C (; !... ,:: L. /.+ _; ,S IR / (.': ""..; L P E R F 'R E C'~:' ~. L 11925---12120 11920-12212 P R O D F' F.:: () F I L E <-L i 192 .5 .... 12 ,,.q. ,'.~ . {"7 :,_ ;' i -,, ~ .' ,~ . ,;.{ ~ .' '73'67 .......... x~T: E:DR/CDN - HWD 1 05 / 24 / 9 !S · i 0 !5 ,/' 2 !!./g c: i 05/" 2/-t/' ,g 5 'i 00 / 08 ./~.:;] 5 0 [.-~ / 0 8/9 5 1 0 o /~.° ,:.:,/9 i 09 ,/ 'i q-,/9 r.;. , , - ....~ 1 [) 9 / 'i 4~ / 9 5 ...../ .. ~.,i t 08 / 08/" 96 DAI. I...Y WELL OF':3 ~ R ,'j/ :¢c,. /".// / TO /,::[' / , /' ,/ :' ~ ' di:!::ch s,5'mp'ie~ r'equ-~r'ed? yes qno-. And r'e..c:e"i'ved? yes ;, · / Ar'e di"y Was !:he v/e'l i cor"ed? yes i' rio Anal t/s:'is & desci-"'ft.)t::'ion r'ece"l'v,::.-'.,d"? yes A r' e v,/e 'i ] !: e s t.: s r' ¢.... ..... q u ~ r' e d ? y e s cfi o R e (:; e 'i v ~ .... ,...:~' ©.y e s . -no We J 'J 'i S 'i in corrlp"i 'i arlce .~ S.:_: I r, 'i !: 'i a i Ii 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate__ Plugging__ Pull tubing __ Alter casing __ Repair well __ Perforate X Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2773' NSL, 670' WEL, SEC. 8 T11N, R17E At top of productive interval 1782' NSL, 3093' EWL, SEC. 4 T11N, R17E At effective depth 1982' NSL, 3109'EWL, SEC. 4 T11N, R17E At total depth 1900' NSL, 3198' EWL, SEC. 4, T11N, R17E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) 56' KB feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 3-37/L-35 9. Permit number/approval number 95-51/not required 10. APl number 50- 029-22554 11. Field/Pool Endicott Field/Endicott Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12600' feet Plugs (measured) 10474' feet BKB 12509' feet Junk (measured) 10465' feet BKB ORIGINAL Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth BKB BKB 90' 30" Driven 130' 130' 5059' 10-3/4" 700sx PF 'E', 650sx 'G' 5100' 4343' 12551' 7-5/8" 450 sx Class 'G' measured 12032'-12062'; 12082'- 12090' (open) 1259O° 1O423' RECEIVED true vertical (Subsea) 9943;9972'; 9991;9999' (open) OCT 2 5 1996 Tubing (size, grade, and measured depth) 4-1/2" 12.6#/ff, L-80 NSCT to 11875' Alaska 0il & Gas Cons. Commission Anchorage Packers and SSSV (type and measured depth) 7-5/8" TIW "HB-BP- 1" @ 11704', HES 'HXO' SVLN (3.813" MIN. ID) w/SSSV MIN LD. is 2.0" 13. Stimulation or cement squeeze summary WSO, Cement Squeeze (8/20/95), Post Squeeze Peris (8/22/95), Add Perforations (9/1/95), Scale Inhibitor Treatment (9/24/95) Intervals treated (measured) 12032'-12062'; 12082'- 12090' Treatment description including volumes used and final pressure wso (see attached). Scale Inhibitor: 950 gals seawater (sw) with 60 gals mutual solvent; 51 bbls scale inhibitor/sw mixture; 116 bbls sw overflush; 187 bbls sw for tubing displacement. FSWHP=n/a 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 1562 2383 3032 0 370 1059 2779 2251 0 370 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 16. Status of well classification as: Oil X Gas__ Suspended__ Service ll 7. I hereb~"~ertify that th,~f,~¢going is tr~ and correct to the best of my knowledge. ~ Title Senior Technical Assistant IV Form 10-4~,/Rev 06/15/88 ~ Date 10/23/96 SUBMIT IN DUPLICATE Endicott Production Engineering Department DATE: 8/22/95 WELL N-°: 3-37/L-35 TYPE OF OPERATION: BP EXPLORATION REP: SERVICE COMPANY: POST SQUEEZE POWERS ATLAS (BARBA) PERFS DATE TIME OPERATIONS SUMMARY 8/23/95 0900 MIRU ATLAS. SIP=1700 PSIG, lAP=300 PSIG, OAP=200 PSIG. 1005 RIH WITH CCI_/GR/26' GUN. 1125 BLEED WHP TO 500 PSIG. TIE-IN TO SBT DATED 5/28/95 AND MAKE A 16' CORRECTION. 1145 LOG INTO PLACE AND SHOOT GUN. NO INDICATIONS. POOH. 1300 AT SURFACE AND GUN DID NOT FIRE. 1345 RIH WITH CCL/GR/26' GUN. 1430 LOG INTO POSITION. SHOOT GUN FROM 12032'-12058' (2' FROM CCLTO TS) LOG OFF AND POOH. 1500 AT SURFACE. ALL SHOTS FIRED. POP WELL WITH POORBOY LIFTGAS. RDMO ATLAS. PERFORATION SUMMARY: GUN DEPTH LENGTH SUBZONE I 12,032' - 12,058' 26' 3A ALL SHOTS FIRED USING 3-3/8" ALPHA JETS, 6 SPF, 60-120° PHASING AND RANDOM OREINTATION. Endicott Production Engineering Department DATE: 9/1/95 WELL N-°: 3-37/I-35i TYPE OF OPERATION: BP EXPLORATION REP: SERVICE COMPANY: Operations Report ADD PERFS D. VARBLE ATLAS (HARPER) RECEIVED OCT Z .::~ 1996 Alaska Oil & ¢~.as Cons. 6ommJssio. Anchorage CURRENT WELL DATA (WELL HEAD) WHFP WHFT lAP OAP CHOKE (PSIG) (DEG F) (PSIG) (PSIG) (BEANS) 410 101 1550 500 75 DATE/TIME OPERATIONS SUMMARY 1230 MIRU ATLAS 1400 SHUT-IN WELL - INSTALL FUSIBLE CAP - RIH WITH PFC/CCL/8' GUN (4' FROM CCL TO TOP SHOT) 1505 OUT OF T.T. - OPEN TO 35 BEANS & BLEED DOWN SIWHP TO 450 PSI 1520 TIE-IN TO DIL DATED 5/17/95 - TAKEOUT20' 1530 ON DEPTH - SHOOT GUN #1 - GOOD CAP BREAK - NO WEIGHT CHANGE - LOG OFF & STOP @ 12004' MD & FLAG LINE 1550 SHUT-IN WELL & POOH 1645 OOH - ALL SHOTS FIRED 1712 RIH WITH PFC/CCL/26' GUN (2' FROM CCL TO TOP SHOT) 1800 OUT OF T.T. - OPEN TO 35 BEANS & BLEED DOWN SIWHP TO 450 PSI 1805 LOG TIE-IN PASS - ADD 4' - LOG INTO PLACE & SHOOT GUN # 2 - DID NOT SEE GOOD CAP BREAK, BUT LOST 50 # IN WEIGHT - LOG OFF 1830 SHUT-IN WELL & POOH 1918 OOH - ALL SHOTS FIRED - POP @ 75 BEANS WITH PBGL (WILL PUT IN TEST SEP. ASAP) 2OOO RDMO PERFORATION SUMMARY: GUN DEPTH LENGTH SUBZONE .1 12082'-12090' 8' 3A1 2 12032'-12058' 26' 3A2 ~ERATION: 3-37 WSu DATE 8/20 -21/95 03.43 1979 Good test. Pressure test BJ N2. Bleed well back to 1800. 03.49 11900 1755 I 0 03.51 " 0 1939 2 POOH. 04.04 10886 27 1980 20 04.22 8822 2107 40 Stop returns. Reduce BJ to 500/min 04.28 8000 710 2071 04.33 7000 660 2065 04.40 6000 604 2063 4900 4900 541 2051 04:48 4800 530 2051 Liquid level. 4700 557 2050 05.22 surf 1966 2002 At surface. Close master. 05.25 /0 Flush coil down flowline. 05.41 35 Shut down. Close wing and choke. Open master. Close swab. IA = 1650, OA = 650 CEMENT SUMMARY I I 15.8 ppg Class "G" cement including Lab thickening time: 8 hrs, 15 min @ 170 BHCT 0.6 % FL-33 Lab fluid loss: 41.2 cc 0.1 % CD-32 Field APl fluid loss: 39.6 cc 0.39 % R-11 Live cell loss: 55 cc 1 ~] HS FP-6L Extrapolated LC loss: 55 cc 18 BBL pumped Lab APl filter cake: 17 mm 12 BBL recovered (may indicate sheathing) Field APl filter cake: 5/8" 2 BBI left in sump (Estimate 2 bbl behind pipe) Live cell cake: 39 mm FLUIDS PUMPED B BLS. DESCRIPTION 153 BBL SW bullhead kill (aborted) 360 Circ SW. 15 15 % HCI, 10 % Xylene 72 Overdisplace acid, flush coil 1 5 FW spacer 1 8 CMT 1 7 FW spacer and displacement 20 SW displacement 423 SW reversincj and jetting 70,000 Scl N2 SUMMARY Endicott Production Engineering Department OPERATIONS REPORT DATE: 9/24/95 WELL N-°: 3-37 / L-35 TYPE OF OPERATION: BP EXPLORATION REP: SERVICE COMPANY: SCALE INHIBITOR TREATMENT THOMAS RUT LITTLE RED & APC VAC TRUCKS Alaska 0ii 8, -. -r ...... DATE/TIME OPERATIONS SUMMARY 9/24 0800 RENDEZVOUS WITH LITTLE RED & APC AT CHEMICAL DOCK. STICK METER ALL CHEMICALS INTO VAC TRUCKS AND 50 BBL DAY TANKS. VAC TRUCKS LOADING SW AT SKID 405. 0930 MIRU LI-I-I'LE RED, FILTERS, & VAC TRUCKS TO WELL 3-37. LAY HARDLINE, TAKE READINGS, AND MAKE CONNECTIONS. lAP = 1300 PSI; OAP = 375 PSI; FWHT = 122° F; CHK = 98 BEANS; FWHP = 390 PSI. 1 020 PRESSURE TEST HARDLINES TO 4000 PSI. SHUT-IN WELL AT WING & CHOKE AND PUMP TREATMENT AS PER FOLLOWING SCHEDULE: TIME RATE PRESSURE CUM FLUID / COMMENT 1 020 2 800 START SW & 5206 1 032 2.5 800 24 950 GALS SW W/6.5% 5206 1 032 3 900 START SI-4004 + SW 1050 3 900 51 275 GALS SI-4004 W/SW 1050 5.7 1300 START SW W/NE-118 OVERFLUSH 1106 5.7 1400 75 SW W/NE-118 1120 2 500 11 6 SW W/NE-118 OVERFLUSH 1120 2 500 START SW TBG DISPLACEMENT 1210 2 500 100 ,, 1244 2 500 176 ,, 1253 2 500 0 / 10 10 BBLS MEOH FRZ PROT. 1330 I SD PUMPS. RDMO LITTLE RED & APC VAC TRUCKS. SUMMARY: PUMPED 950 GALS SW WITH 60 GALS SS-5206 MUTUAL SOLVENT PUMPED 51 BBLS Sl-4004 AS A 1:8 MIXTURE IN SW PUMPED 116 BBLS SW OVERFLUSH WITH 0.2% NE-118 PUMPED 187 BBLS SW FOR TUBING DISPLACEMENT SD PUMPS AT 1330 HRS ON 9/24. POP WELL AT 0130 HRS 9/25 (+12 HRS) TONY KNOWLE$, GOVERNOR ALASI~& OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 TO: FROM: Wendy Mahan Natural ResourCe Officer David W. Johnston, Chai'rl~gX~an~i//jc./~.~''~ Tuckerman Babcock, Commissioher Leak-Off Tests at Endicott DATE: 21 Oct 96 There is a possibility that some leak-off tests within the Endicott Field may not have been properly conducted. ~.~,-,. 0~' ! ~' Specifically, leak-off tests on 1-31,(J-37_7~nd 4-32. Commissioner Johnston and I have discussed this matter and request tlmTyou initiate an investigation to determine whether these tests were properly conducted under our standard of good oilfield engineering practices. Please feel free to rely on Mr. Wondzell and the inspectors for assistance. The allegations are serious and your investigation should be conducted with deliberate speed and tempered by discretion. Commissioner Johnston and I will assist you in any way possible. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG !1. Status of Well Classification of Service Well OIL~.. GAS [] SUSPENDED [] ABANDONED [] SERVICE [] Produce 2. Name of Operator 7. Permit Number BP Exploration 95-51 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5 o- 029-22554 4. Location of well at surface ? ........ 9. Unit or Lease Name 2773' NSL, 670' WEL, SEC. 8, T11N, R17E i' ~;?;' ?:;.?..'1%.: : Duck/s/and Unit/Endicott 1782'NSL, 3093'EWL, SEC. 4, T11N, R17E i' v~.; ..... --~; 11. Field and Pool 1900' NSL, 3198' EWL, SEC. 4, T11N, R17E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 56' I ADL 047503 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore [16. No. of Completions 4/30/95 5/17/95 5/30/95I 6-12'AMSL feet MSL lOne 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost I 12600' MD/10474' TVD 12590' MD/10465' TVD YES [] NO [] 1607 feet MD J 1650' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, CNL,ZDL, DIFL, FMT 23. CASING, UNER AND CEMENTING RECORD SEI-I-ING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 30" Struct, Drive 40' 130' 30" Drive 10-3/4" 45.5# NT80 41' 5100' 13-1/2" 750 sx PF 'E', 650 sx Class 'G' 7-5/8" 29. 7# NT95HS 39' 12590' 9-7/8" 450 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Gun Diameter 3-3/8", 6 spf 4-1/2", L-80 11875' 11708' MD TVD 12032'-12062' 9943'-9972' 26. ACID, FRACTURE, CEMENTSQUEEZE, ETC. 12082'-12090' 9991'-9999' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect w/ 60 bbls to 1500' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 5/30/95 Flowing Date of Test Hours Tested ]-EST:~RODUCTIONpERIOD FORi~ OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Casing Pressure 3ALCULATED OIL-BBL GAS-MCF WATER-BBL iOIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. FEB 2 5 996 Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. BKB HRZ 11736' 9659' Kekiktuk 12032' 9943' K2A 12303' 10203' 31. LIST OF A'FrACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,, z..¢ ..~/A ,.~ Title SeniorDrillingEn,qineer Date - ..,.j vv- ~ ~ VI./' - INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. . Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. .. Item 16 and 24 · If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". i-:t:.~ 2 .:: 1996 Form 10-407 ~F/AAI SHARED SERVICE DAILY OPERATIONS~ PAGE: 1 WELL: 3-37/L-35I BOROUGH: NORTH SLOPE UNIT: ENDICOTT FIELD: ENDICOTT LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 04/29/95 10:00 SPUD: RELEASE: OPERATION: DRLG RIG: DOYON 15 WO/C RIG: DOYON 15 04/30/95 (1) TD: 213' ( 213) 05/01/95 ( 2) TD: 2520'(2307) 05/02/95 ( 3) TD: 3900'.(1380) 05/03/95 (4) TD: 5105' (1205) 05/04/95 ( 5) TD: 5105' ( 0) DRILLING MW: 0.0 VIS: 0 MIRU. ACCEPT @ 10:00 HRS. FILL PIT TANKS W/WATER, MIX SPUD MUD. STREAM & STRAP BHA. PU BIT & STAB & 2 STDS OF HWDP. RIH ATTEMPT T/RECOVER HOLE COVER THAT WAS LOST IN HOLE ON PRE-RIG WORK. APPARENTLY PUSHED OFF TO THE SIDE OF THE WALL, BUT WE NEVER NOTICED IT. SERVICED THE TOP DRIVE. REPAIRED SHEARED BOLT ON PIPE HANDLER. PU BHA, RIH T/120, ATTEMPT T/CIRC. BIT PLUGGED. POOH, CLEAR THE BIT, REORIENT, RIH. DRILL T/213. WORK ON THE TOP DRIVE. SHORT TRIP MW: 0.0 VIS: 0 DRILL & SURVEY T/2520. MD. CBU. SHORT TRIP F/2520 T/480. DRILLING MW: 0.0 VIS: 0 DRILL F/2520 F/3474. CBU. POOH F/BIT. SERVICE THE RIG. CHANGE BIT & BHA. RIH T/2900. REAM UNDER GAUGE HOLE 2900 T/3474. DRILL & SURVEY F/3900. RU T/RUN 10-3/4" CSG MW: 0.0 VIS: 0 DRILL & SURVEY T/5105 MD. CBU. SHORT TRIP F/5100 T/2900. CIRC HOLE CLEAN. POOH SLM= NO CORRECTION. WORK OUT TIGHT SPOT @3611. OBSERVE THE WELL. HOLE TAKING FLUID 3 BBLS /30 MIN. LD BHA. RU T/RUN 10-3/4" CASG. TEST BOPE MW: 0.0 VIS: 0 RUN 10-3/4 SURFACE CASING. CIRCULATE & CONDITION MUD. PUMP 10 BBLS WATE & PRESS TEST CMT LINE T/2500PSI. PUMP REMAINING 90 BBLS OF WATER FOLLOWED BY 750 SX ( 290 BBLS) OF LEAD CMT & 650 SX (133 BBLS) OF TAIL CMT. DISPLACED W/CALULATED VOL OF MUD (482 BBLS) & BUMPED PLUG W/2000PSI. BLED OFF PRESSURE & FLOATS HELD. ~IP @18:15 HRS. CMT T/SURF = 70 BBLS. LD LANDING JT. & CLEAR FLOOR OF CASG TOOLS. ND RISER, ANNULAR & DIVERTOR. MU UNIVERSAL STARTING HEAD. NU BOPE. TEST LOWER SEAL ON STATING HEAD T/1000PSI. PRESS TEST BOPE. WITNESS WAIVED BY JERRY HERRING OF THE AOGCC. .. FEB 2 3 lg86 ~,,~k~ Oil ~ ,'~s Cons. WELL : 3-37/L-3 OPERATION: RIG : DOYON 15 PAGE: 2 05/05/95 ( 6) TD: 5725' ( 620) 05/06/95 (7) TD: 7134' (1409) 05/07/95 ( 8) TD: 8153' (1019) 05/08/95 ( 9) TD: 8266' ( 113) 05/09/95 (10) TD: 9315' (1049) 05/10/95 (11) TD: 9330' ( 15) DRILLING MW: 0.0 VIS: 0 PRESS TEST BOPE. INSTALL WEAR BUSHING. PU 9-7/8 BIT & BHA #3. TEST MWD & MOTOR. ANADRILL HAD PROBLEMS W/MWD SURFACE EQUIP. TIH T/1095. SLIP & CUT 60' DRILLING LINE. TIH T/FLOWT COLLAR. @5008' CIRC & COND MUD. PRESS TEST 9-7/8" CASG T/3000PSI F/30 MIN. DRILL FLOAT COLLAR, HARD CMT, SHOE & 10' OF NEW HOLE. CIRC BTTMS UP. PERFORM LEAK OFF TEST/ 10.9 PPG EMW. DRILL F/5105 T/5725. CIRCULATE MW: 0.0 VIS: 0 DRILL & SURVEY F/5725 T/6105. SHORT TRIP T/9-7/8" SHOE @5098. NO PROBLEMS. PERFORM SECOND LEAK OFF TEST. 11.3 PPG EMW. TIH T/6150. NO PROBLEMS. DRILL & SURVEY F/6150 T/7134. CIRC BTTMS UP BEFORE WIPER TRIP. BIT TRIP MW: 0.0 VIS: 0 TOOH T/6100 F/WIPER TRIP. OK. DRILL & SURV F/7134 T/8084. CIRC SWEEP AROUND. SHORT TRIP T/7028. OK. TIH --OK. DRILL & SURVEY F/8084 T/8153. PUMP SWEEP AROUND. RU & DROP SS MULTI-SHOT SURVEY. TOOH F/BIT. DRILLING MW: 0.0 VIS: 0 TOOH W/BHA. LD MOTOR & MWD. CLEAN RIG FLOOR & SERVICE STRIP O MATIC PIPE WIPER. MU BHA #4. PU NEW MOTOR & MWD & ORIENT. SURFACE TEST MOTOR & MWD @700. TIH INSTALLING NON-ROTATING DP RUBBERS. 1 PER F/800 & 2 P PER JT. AFTERWARDS. TOTAL OF 240 RUBBERS ON 44 STNDS. TOOH T/7789. FILL PIPE @5020. PRECAUTIONARY REAM F/7789 T/8453. DRILL F/8153 T/8266. DRILLING MW: 0.0 VIS: 0 DRILLING & SURVEYING F/8266 T/9121. CBU. WIPER TRIP T/8153 & BACK T/BTTM. NO PROBLEMS. DRILL & SURVEY F/9121 T/9315. CUT DRILG LINE MW: 0.0 VIS:. 0 DRILL & SURVEY F/9217 T/9330. CBU. OBSERVE THE WELL. TOOH F/BIT & MWD. DRILLER BUMPED SILLS UNDER CROWN W/BLOCK--CRACKED THE SILLS. PRE-JOB SFTY MTG. REMOVED DAMAGED SILLS F/DERRICK CROWN. TOOH W/BHA. CHANGE OUT STIP-O-MATIC, SWIVEL PACKING & SAVER SUB ON TOP DRIVE. INSTALL GEOGRAPH LINE. CHANGE OUT MWD & BIT. TIH W/BHA & TEST MWD. PU 30 JTS OF 5" DP F/PIPE SHED. CUT DL. WELL : 3-37/L-3 OPERATION: RIG : DOYON 15 PAGE: 3 05/11/95 (12) TD: 9999' ( 669) 05/12/95 (13) TD:10333' ( 334) 05/13/95 (14) TD:ll050' ( 717) 05/14/95 (15) TD:11354' ( 304) 05/15/95 (16) TD:12002' ( 648) 05/16/95 (17) TD:12275' ( 273) 05/17/95 (18) TD:12600' ( 325) DRILLING MW: 0.0 VIS: 0 TRIP IN HOLE T/9130. CHECK SHOT SURVEY @ 6539. OK. PRECAUTIONARY REAM F/9130 T/9330. DRILL & SURVEY F/9330 T/9999. BIT TRIP MW: 0.0 VIS: 0 DRILL & SURVEY F/9999 T/10333. CIRC SWEEPS AROUND. SURVEY. OBSERVE THE WELL. TOOH F/NEW BIT. PULL BHA. LD MWD & MUD MOTOR. CLEAR RIG FLOOR & SERVICE RIG. PERFORM WEEKLY BOPE TEST. MU BHA %6. DRILLING MW: 0.0 VIS: 0 TIH W/BIT & BHA %6. ORIENT & TEST MWD. TIH W/DP. CHECK SHOT SURVEY @6553. DRILL & SURVEY F/10333 T/l1050. ROP HAS BEEN 100 FT/HR WHEN ROTATING. DRILLING MW: 0.0 VIS: 0 DRILL & SURVEY F/l1050 T/11146. UNABLE T/SLIDE & KEEP ANGLE UP. WIPER TRIP 5 STNDS T/10672. NO PROBLEMS. DRILL F/11146 T/11178. STILL UNABLE T/SLIDE. ANGLE DROP UNACCEPTABLE. TOOH F/BIT & BHA. CHECK SHOT SURVEY @ 6655. NO PROBLEMS. PULL BHA. MU & RIH W/BIT # & BHA #7. ORIENT & TEST MOTOR & MWD. TIH & PU 30 JTS OF 5" DP F/SHED. CUT DL. TIH T/11178. CHECK SHOT SURVEY @6539. NO FILL. NO PROBLEMS. WORK TRQ OUT OF DRILL PIPE & ORIENT TOOL FACE. DRILL & SURVEY F/11178 T/11354. TRIPPING MW: 0.0 VIS: 0 DRILL & SURVEY F/11354 T/12002. CIRC. SWEEPS AROUND. OBSERVE WELL. PUMP DRY JOB. TOOH F/BIT & BHA. TIGHT HOLE @ 11354, 11278 & 11195. WIPED OUT TIGHT SPOTS W/NO PROBLEM. DRILLING MW: 0.0 VIS: 0 POOH. OBSERVE THE WELL @ CASG SHOE. CHANGE BHA. LD MOTOR & MWD TOOL. MU NEW BIT #8. & BHA, RIH T/CASG SHOE, FILL PIPE. RIH. WASH & REAM THROUGH TIGHT SPOTS. WASH & REAM T/BTTM @ 12002. DRILL 9-7/8" OPEN HOLE F/12002 T/12275. DROP'EMS MW: 0.0 VIS: 0 DRILL 9-7/8" OPEN HOLE F/12275 T/12600. CBU, OBSERVE THE WELL, STABLE, MIX & PUMP DRY JOB. MAKE 22 STND SHORT TRIP F/12600 T/10592. HOLE IN GOOD CONDITION. CBU. PUMP HI/LOW VIS SWEEP, KEEP PIPE MOVING. DROP ELECTRONIC MULTI-SHOT. ,,ELL : 3-37/L-3 OPERATION: RIG : DOYON 15 PAGE: 4 05/18/95 (19) TD:12600' ( 0) 05/19/95 (20) TD:12600' ( 0) 05/20/95 (21) TD:12600 PB: 0 05/21/95 (22) TD:12600 PB: 0 WIPER TRIP AFTER LOGGING MW: 0.0 VIS: 0 PUMP SS. MULTI SHOT. BOSERVE THE WELL. POOH W/DP & BHA T/SHOE. OBSERVE THE WELL. POOH & RETRIEVE MULTI SHOT. RU ATLAS WL. RU TRIP #1 & TRIP #2. RD ATLAS WL. MU BHA W/R/R BIT #5. RIH WHILE REMOVING DP RUBBERS. PREP RIG T/RUN CASG MW: 0.0 VIS: 0 RIH & REMOVE THE NRP RUBBERS. CUT DL. RIH T/12002. WASH & REAM UNDERGUAGE HOLE F/12002 T/12600. CBU. SHORT TRIP T/11167. PUMP LO/HI VIS SWEEPS & CIRCULATE HOLE CLEAN @12600. POOH & STAND BACK 30 STNDS OF DP IN DERRICK. POOH LD DP F/RIG MOVE. OBSERVE WELL @BHA, POOH, CLEAR FLOOR & PREPARE T/RUN 7-5/8" CASG. RIH W/4.5" TBG MW: 0.0 CHANGE RAMS T/7-5/8" & TEST BONNET SEALS. RU T/ RUN CASG. RIH W/304 JTS. CIRC 14 BPM @2500PSI. RU HALLIBURTON, PUMP 10 BBLS OF WATER, TEST SURFACE LINES T/3500PSI. PUMP 10 BBLS OF H20, 70 BBLS OF SPACER @ 11.2#, PUMP 92 BBLS OF 15.8 PPG CMT @ 5.5 BPM & 550 PSI. BUMP PLUG & HELD 3500PSI/30 MIN. CIP @ 23:15. LAND HNGR, CLEAR FLOOR. INSTALL PACK-OFF & TEST T/5000P$I. CHANGE RAMS T/4.5" & TEST. PUMP 220 BBLS MUD & 60 BBLS DIESEL DOWN THE OUTER ANNULUS. RU & RUN 4.5" TBG & TIW 7-5/8" X 4-1/2" PACKER. FREEZE PROTECT TBG MW: 0.0 RIH W/4-1/2" TBG & TIW 7-5/8" X 4-1'/2" PACKER. PU BALL VOLVE, MU CL & TEST T/5000PSI. RIH W/TBG & CL, MU HANGR, TEST T/5000PSI. LAND HNGR. ND BOPE. NU & TEST ADAPTER FLANGE, CL & TREE T/5000. RU DSM LUBRICATOR & PULL TWC., REVERSE CIRC ANNUL. VOL W/SEAWATER TREATED W/COREXIT #7726. DROP PKR SETTING BALL, PRESS. TBG T/4500 PSI. SET PACKER. HELD @ 4500/30 MIN. BLEED TBG PRESS T/1500PSI. PRESS DOWN ANNUL. TEST PKER T/3500PSI/30 MIN. BLED PRESS OFF OF TBG. RP VALVE SHEARED @ 3000PSI. RRZ PROTECT TBG & ANNUL T/1500 W/DIESEL. SIGNATURE: (drilling Superintendent) DATE: S RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOTT / 3-37/L-35I 500292255400 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/ 1/95 DATE OF SURVEY: 051795 ELECTRONIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-50038/43 KELLY BUSHING ELEV. = 56.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 5139 4413.25 4357.25 5195 4451.45 4395.45 5291 4516.65 4460.65 5386 4580.72 4524.72 5482 4645.91 4589.91 47 17 N 43.30 E .00 1427.08N 1296.12E 47 36 N 35.41 E 10.31 1459.20N 1322.45E 47 29 N 43.38 E 6.09 1514.15N 1367.57E 47 18 N 42.93 E .40 1564.98N 1415.23E 47 2 N 42.36 E .52 1616.72N 1462.89E 1927.81 1969.27 2040.29 2109.95 2180.30 5578 4711.26 4655.26 5672 4774.60 4718.60 5768 4838.12 4782.12 5864 4901.50 4845.50 5960 4965.39 4909.39 47 19 N 41.37 E .82 1669.24N 1509.95E 48 7 N 41.17 E .87 1721.62N 1555.91E 48 40 N 38.94 E 1.83 1776.38N 1601.94E 48 37 N 38.89 E .07 1832.42N 1647.19E 48 21 N 38.10 E .68 1888.92N 1692.12E 2250.82 2320.48 2391.96 2463.85 2535.86 6057 5029.59 4973.59 6152 5093.50 5037.50 6248 5156.93 5100.93 6344 5221.51 5165.51 6472 5306.61 5250.61 48 2 N 38.12 E .32 1945.41N' 1736.44E 48 11 N 38.11 E .14 2001.49N 1780.43E 48 10 N 40.11 E 1.57 2056.48N 1825.14E 47 55 N 40.68 E .51 2111.22N 1871.71E 48 13 N 40.85 E .25 2182.99N 1933.59E 2607.46 2678.53 2749.29 2821.11 2915.83 6534 5348.56 5292.56 6629 5411.87 5355.87 6726 5476.15 5420.15 6822 5539.97 5483.97 6918 5603.86 5547.86 48 12 N 41.14 E .35 2218.43N 1964.38E 48 8 N 41.33 E .16 2271.64N 2011.02E 47 59 N 41.53 E .23 2325.29N 2058.36E 48 40 N 41.55 E .72 2378.96N 2105.91E 48 30 N 40.80 E .61 2433.48N 2153.60E 2962.77 3033.51 3105.05 3176.75 3249.16 7012 5666.16 5610.16 7107 5728.98 5672.98 7201 5791.74 ~ 5735.74 7297 5855.41 5799.41 7393 5919.52 5863.52 48 28 N 41.09 E .24 2486.66N 2199.73E 48 30 N 41.44 E .27 2540.01N 2246.55E 48 13 N 41.42 E .30 2592.95N 2293.27E 48 9 N 41.54 E .11 2646.29N 2340.43E 48 8 N 41.37 E .14 2699.93N 2387.82E 3319.53 3390.50 3461.09 3532.28 3603.85 7488 5983.30 5927.30 7584 6047.23 5991.23 7679 6110.83 6054.83 7774 6174.28 6118.28 7869 6237.02 6181.02 47 46 N 40.96 E .49 2753.18N 2434.38E 48 13 N 41.06 E .47 2806.74N 2480.96E 47 47 N 41.30 E .48 2859.92N 2527.48E 48 42 N 41.55 E .97 2913.23N 2574.52E 48 22 N 41.44 E .36 2966.42N 2621.57E 3674.56 3745.53 3816.17 3887.25 3958.26 7965 6300.66 6244.66 8156 6429.56 6373.56 8251 6494.67 6438.67 8346 6561.25 6505.25 8442 6629.82 6573.82 48 8 N 41.41 E .24 3019.90N 2668.76E 47 17 N 41.73 E .46 3125.95N 2762.81E 46 9 N 41.39 E 1.22 3177.69N 2808.68E 44 58 N 40.71 E 1.34 3228.89N 2853.28E 43 19 N 40.65 E 1.73 3279.38N 2896.67E 4029.57 4171.30 4240.44 4308.32 4374.85 FEB 2 3 '1996 Si XRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOTT / 3-37/L-35I 500292255400 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/ 1/95 DATE OF SURVEY: 051795 ELECTRONIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-50038/43 KELLY BUSHING ELEV. = 56.00 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORD DEGREES DG/100 NORTH/SOUTH EAST INATES /WEST VERT. SECT· 8537 6699.81 6643.81 8633 6771.91 6715.91 8728 6845.30 6789.30 8823 6920.36 6864.36 8919 6998.25 6942.25 42 25 N 41.01 E .97 3328.55N 2939 40 8 N 41.34 E 2.39 3376.22N 2980 38 38 N 41.24 E 1.58 3421.51N 3020 36 42 N 40.36 E 2.12 3465.38N 3058 33 53 N 38.89 E 3.08 3507.84N 3093 .16E .85E .62E .51E .70E 4439.82 4503.12 4563.39 4621.33 4676.42 9014 7079.01 7023.01 9108 7161.18 7105.18 9203 7245.21 7189.21 9298 7331.82 7275.82 9393 7419.37 7363.37 29 46 N 38.15 E 4.35 3547.06N 3124 29 5 N 39.38 E .97 3583.21N 3153 26 8 N 38.32 E 3.14 3617.43N 3181 23 38 N 38.28 E 2.61 3648.98N 3206 21 41 N 41.71 E 2.49 3677.01N 3229 .94E · 96E .56E .47E .93E 4726.44 4772.71 4816.58 4856.67 4893.19 9489 7508.33 7452.33 9584 7597.49 7541.49 9680 7688.01 7632.01 9775 7777.91 7721.91 9872 7869.10 7813.10 20 50 N 41.84 E .90 3702.82N' 3252 19 51 N 40.76 E 1.11 3727.65N 3274 19 34 N 41.06 E .31 3752.17N 3296 19 27 N 41.18 E .13 3776.17N 3317 18 7 N 42.92 E 1.51 3799.22N 3337 · 99E .81E · 05E .00E .77E 4927.80 4960.85 4993.27 5025.13 5056.15 9968 7960.72 7904.72 10064 8052.26 7996.26 10161 8144.40 8088.40 10256 8234.67 8178.67 10352 8325.52 8269.52 18 6 N 42..74 E .06 3821.19N 3358 18 0 N 43.72 E .33 3842.94N 3378 18 5 N 43.86 E .09 3864.62N 3399 17 55 N 44.92 E .39 3885.59N 3419 18 38 N 44.61 E .76 3906.91N 3441 · 14E · 58E .37E · 89E .03E 5086.11 5115.96 5145.98 5175.31 5205.30 10449 8417.03 8361.03 10544 8507.24 8451.24 10639 8596.56 8540.56 10735 8688.09 8632.09 10832 8779.67 8723.67 19 19 N 42.60 E .97 3929.70N 3462 19 4 N 41.15 E .56 3953.09N 3483 18 42 N 40.67 E .41 3976.19N 3503 18 17 N 40.37 E .44 3999.48N 3523 18 10 N 40.29 E .13 4022.49N 3543 .73E · 69E · 71E .62E .15E 5236.77 5268.18 5298.74 5329.36 5359.52 10928 8871.50 8815.50 11024 8963.42 8907.42 11120 9055.61 8999.61 11215 9146.28 9090.28 11310 9237.90 9181.90 17 37 N 39.76 E .61 4045.20N 3562 15 33 N 40.66 E 2.17 4066.11N 3579 16 52 N 39.10 E 1.45 4086.69N 3597 16 25 N 38.67 E .49 4107.79N 3614 17 27 N 38.64 E 1.07 4129.58N 3631 .23E .89E · 06E .09E · 51E 5389.15 5416.50 5443.28 5470.34 5498.18 11406 9329.36 9273.36 11502 9421.18 9365.18 11598 9513.17 9457.17 11693 9603.79 9547.79 11788 9695.56 9639.56 17 14 N 38.43 E .24 4151.93N 17 1 N 39.23 E .33 4173.97N 16 52 N 39·78 E .23. 4195.60N 16 8 N 39.90 E .76 4216.23N 15 23 N 39.65 E .80 4236.14N 3649.31E 3667.05E 3684.88E 3702.09E 3718.67E 5526.68 5554.92 5582.92 5609.75 5635.63 ~RRY-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOTT / 3-37/L-35I 500292255400 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/ 1/9 DATE OF SURVEY: 051795 ELECTRONIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-50038/43 KELLY BUSHING ELEV. = 56.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11884 11980 12075 12171 12266 9788.01 9732.01 9879.41 9823.41 9970.91 9914.91 10062.30 10006.30 10153.67 10097.67 16 27 16 58 16 27 16 2 16 16 N 39.73 E 1.12 4256.43N 3735.51E N 40.07 E .55 4277.48N 3753.12E N 40.99 E .60 4298.37N 3770.97E N 41.44 E .46 4318.42N 3788.52E N 41.71 E .25 4338.21N 3806.09E 5661.97 5689.39 5716.85 5743.49 5769.95 12361 12455 12552 12600 10244.94 10188.94 16 35 10335.38 10279.38 16 34 10427.93 10371.93 15 9 10474.26 10418.26 15 9 N 41.41 E .36 4358.36N 3823.95E N 41.03 E .12 4378.62N 3841.70E N 42.72 E 1.55 4398.22N 3859.25E N 42.72 E .00 4407.44N 3867.76E 5796.87 5823.80 5850.10 5862.66 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5863.88 FEET AT NORTH 41 DEG. 16 MIN. EAST AT MD = 12600 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 42.44 DEG. TIED IN AT 5,139' INTERPOLATED DEPTH 12,600' Alask~ Oil ,~ '.3a.s C, ons. Commission Anchorage S~{RY-SUN DRILLING SERVICES A/~CHOR_AGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOTT / 3-37/L-35I 500292255400 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/ 1/95 DATE OF SURVEY: 051795 JOB NUMBER: AK-EI-50038/43 KELLY BUSHING ELEV. = 56.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 5139 4413.25 4357.25 1427.08 N 1296.12 E 725.75 6139 5084.22 5028.22 1993.32 N 1774.03 E 1054.78 329.03 7139 5749.85 5693.85 2557.70 N 2262.16 E 1389.15 334.37 8139 6417.59 6361.59 3116.28 N 2754.18 E 1721.41 332.27 9139 7187.95 7131.95 3594.52 N 3163.20 E 1951.05 229.64 10139 8122.76 8066.76 3859.53 N 3394.47 E 2016.24 65.19 11139 9073.35 9017.35 4090.87 N 3600.46 E 2065.65 49.41 12139 10031.42 9975.42 4311.76 N 3782.65 E 2107.58 41.93 12600 10474.26 10418.26 4407.44 N 3867.76 E 2125.74 18.17 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. ~ f'r,- - ~ - FEB 2 5 1996 G~s Corm, Commission ~ora~e St XRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOTT / 3-37/L-35I 500292255400 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/ 1/95 DATE OF SURVEY: 051795 JOB NUMBER: AK-EI-50038/43 KELLY BUSHING ELEV. = 56.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 5139 4413.25 4357.25 1427.08 N 1296.12 E 725.75 5202 4456.00 4400.00 1463.22 N 1325.37 E 746.19 5350 4556.00 4500.00 1545.36 N 1396.98 E 794.17 5497 4656.00 4600.00 1624.73 N 1470.19 E 841.34 20.44 47.97 47.17 5644 4756.00 4700.00 1705.99 N 1542.25 E 888.98 5795 4856.00 4800.00 1792.20 N 1614.73 E 939.61 5946 4956.00 4900.00 1880.61 N 1685.61 E 990.74 6096 5056.00 5000.00 1968.53 N 1754.57 E 1040.69 6246 5156.00 5100.00 2055.69 N 1824.47 E 1090.65 47.64 50.63 51.13 49.95 49.96 6396 5256.00 5200.00 2140.20 N 1896.62 E 1140.14 6546 5356.00 5300.00 2224.70 N 1969.86 E 1190.16 6696 5456.00 5400.00 2308.55 N 2043.54 E 1240.02 6846 5556.00 5500.00 2392.60 N 2118.00 E 1290.39 6997 5656.00 5600.00 2478.00 N 2192.19 E 1341.38 49.49 50.02 49.86 50.37 50.99 7148 5756.00 5700.00 2562.90 N 2266.75 E 1392.27 7298 5856.00 5800.00 2646.78 N 2340.87 E 1442.36 -7448 5956.00 5900.00 2730.45 N 2414.64 E 1492.17 7597 6056.00 6000.00 2814.15 N 2487.41 E 1541.51 7747 6156.00 6100.00 2897.66 N 2560.72 E 1591.00 50.89 50.10 49.81 49.33 49.50 7898 6256.00 6200.00 2982.43 N 2635.71 E 1642.04 8047 6356.00 6300.00 3066.24 N 2709.63 E 1691.99 8195 6456.00 6400.00 3147.33 N 2781.87 E 1739.63 8339 6556.00 6500.00 3224.92 N 2849.86 E 1783.31 8478 6656.00 6600.00 3298.11 N 2912.76 E 1822.30 51.03 49.96 47.63 43.69 38.99 8612 6756.00 6700.00 3366.14 N 2971.98 E 1856.98 8742 6856.00 6800.00 3427.94 N 3026.26 E 1886.48 8867 6956.00 6900.00 3485.23 N 3075.18 E 1911.70 8987 7056.00 7000.00 3536.45 N 3116.57 E 1931.47 9102 7156.00 7100.00 3580.98 N 3152.13 E 1946.58 34.69 29.50 25.22 19.77 15.10 9215 7256.00 7200.00 3621.59 N 3184.84 E 1959.37 9325 7356.00 7300.00 3657.29 N 3213.03 E 1969.26 9433 7456.00 7400.00 3687.89 N 3239.62 E 1977.17 9540 7556.00 7500.00 3716.31 N 3265.04 E 1984.20 9646 7656.00 7600.00 3743.58 N 3288.58 E 1990.49 12.79 9.88 7.92 7.02 6.29 9752 7756.00 7700.00 3770.35 N 3311.91 E 1996.61 6.12 .RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOTT / 3-37/L-35I 500292255400 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/ 1/95 DATE OF SURVEY: 051795 JOB NUMBER: AK-EI-50038/43 KELLY BUSHING ELEV. = 56.00 OPEP~ATOR: BP EXPLOP~ATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE MEASD VERTICAL DEPTH DEPTH SUB-SEA TOTAL VERTICAL RECTA/~GULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 9858 7856.00 7800.00 3796.08 N 3334.85 E 2002.39 9963 7956.00 7900.00 3820.06 N 3357.09 E 2007.60 10068 8056.00 8000.00 3843.82 N 3379.42 E 2012.79 10173 8156.00 8100.00 3867.36 N 3401.99 E 2017.97 10279 8256.00 8200.00 3890.48 N 3424.76 E 2023.10 5.78 5.21 5.18 5.18 5.13 10384 8356.00 8300.00 3914.23 N 3448.25 E 2028.53 10490 8456.00 8400.00 3939.77 N 3471.96 E 2034.43 10596 8556.00 8500.00 3965.76 N 3494.75 E 2040.24 10701 8656.00 8600.00 3991.40 N 3516.74 E 2045.79 10807 8756.00 8700.00 4016.56 N 3538.12 E 2051.-10 5.43 5.90 5.81 5.55 5.31 10912 8856.00 8800.00 4041.41 N 3559.08 E 2056.25 11016 8956.00 8900.00 4064.55 N 3578.54 E 2060.74 11120 9056.00 9000.00 4086.78 N 3597.14 E 2064.86 11225 9156.00 9100.00 4110.03 N 3615.88 E 2069.23 11329 9256.00 9200.00 4134.03 N 3635.07 E 2073.85 5.15 4.49 4.12 4.36 4.62 11434 9356.00 9300.00 4158.40 N 3654.44 E 2078.58 11539 9456.00 9400.00 4182.23 N 3673.79 E 2083.19 11643 9556.00 9500.00 4205.55 N 3693.17 E 2087.68 11747 9656.00 9600.00 4227.74 N 3711.71 E 2091.78 11851 9756.00 9700.00 4249.16 N 3729.47 E 2095.58 4.74 4.61 4.50 4.10 3.80 11955 9856.00 9800.00 4272.02 N 3748.52 E 2099.92 12060 9956.00 9900.00 4295.05 N 3768.08 E 2104.38 12164 10056.00 10000.00 4317.06 N 3787.32 E 2108.57 12268 10156.00 10100.00 4338.72 N 3806.54 E 2112.68 12372 10256.00 10200.00 4360.83 N 3826.13 E 2116.95 4.33 4.47 4.18 4.11 4.27 12477 10356.00 10300.00 4383.25 N 3845.73 E 2121.29 12581 10456.00 10400.00 4403.80 N 3864.40 E 2125.08 12600 10474.26 10418.26 4407.44 N 3867.76 E 2125.74 4.34 3.79 .66 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS FEB 2 Alaska Oil & Gss Cons. Comrnissior~ gyro/data B.P, EXPLORATION SDI UNIT, WELL NO. ENDICOTT FIELD, ALASKA Gyro Muitishot Survey in 4.5" tubing Survey date :29 May, 1995 Job numbe'r · AK0595G267 FEB 2 5 1996 ~aska Oil & Gas Cons. 0ommission Anchorage SR267.DOC gyr /data Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 June 6, 1995 Ms. Terrie Hubble B.P. Exploration Prudhoe Bay Drilling Department 900 E. Benson Blvd. Anchorage, AK 99508 MB 12-1 Re: SDI UNIT WELL #3-37/L-351, Endicott Field, Alaska Dear Ms. Hubble, Enclosed please find one (1) original and three copies (3) of the completed survey of Well #3-37/L-35 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely Robert J. Shoup Operations Manager RS/gr Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER · AK059G267 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR267.DOC gyro/data 1. DISCUSSION, SURVEY CERTIFICATION SHEET SR267.DOC gyro/data DISCUSSION JOB NUMBER: AK0595G267 Tool 080 was run in 3-37/L-351 on ATLAS 15/16" Wireline inside 4.5" tubing. The survey was run without problems. SR267.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER' AK0595G267 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and probedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- TIM ANDERSON TOM STODDARD OPERATIONS ENGINEER SR267.DOC gyro/data 2. SURVEY DETAILS SR267.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0595G267 CLIENT: B.P. EXPLORATION RIG: ATLAS LOCATION: SDI UNIT WELL: 3-37/L-351 LATITUDE: 70.342 N LONGITUDE: S U RVEY DATE: 148.5 W 29-May, 1995 SURVEY TYPE : MULTISHOT IN 4.5" tubing DEPTH REFERENCE: MAX. SURVEY DEPTH: ROTARY TABLE EVELATION 56.0 asl, 15.9' G.L. 12450 SURVEY TIED ONTO: N/A SURVEYINTERVAL: 100' UTM CO-ORDINATES: TARGET DIRECTION: 42.44 GRID CORRECTION: CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: STODDARD SR267.DOC gyro/data 3. OUTRUN SURVEY LISTING SR267.DOC A Gyro da t a D i r e c t i ona i S u rv ey for Job Number: AK0595G267 B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" TUBING Location: SDI UNIT, ENDICOTT FIELD ALASKA Run Date: 29-May-95 07:19:37 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70°342000 deg. N Sub-sea Correction from Vertical Reference: 56 ft. Azimuth Corrected:: Gyro: Bearings are Relative to True North Proposed Well Direction: 42.440 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i o n a i Survey B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" TUBING Location: SDI UNIT, ENDICOTT FIELD ALASKA Job Number: AK0595G267 MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 0.0 0. O0 0. O0 O. 0 0.0 -56.0 0.00 0.0 0.0 ALL MEASURED DEPTHS REFRENCED TO R.K.B. (HEIGHT 56'). 0.0 - 12450.0 FEET; GYRODATA SURVEY RUN IN 4 1/2" TUBING. Page HORIZONTAL COORDINATE feet 0.00 N 0.00 E 100.0 .18 165.14 100.0 -.1 44.0 200.0 .24 123.12 200.0 -.1 144.0 300.0 .21 90.99 300.0 .0 244.0 400.0 .71 17.19 400.0 .7 344.0 500.0 1.83 8.41 500.0 2.6 444.0 600.0 2.80 8.37 599.9 5.9 543.9 700.0 4.19 12.36 699.7 11.1 643.7 800.0 4.37 13.22 799.4 17.6 743.4 900.0 4.38 12.82 899.1 24.2 843.1 1000.0 4.53 12.00 998.8 31.0 942.8 1100.0 4.34 9.78 1098.5 37.6 1042.5 1200.0 3.16 3.43 1198.3 42.9 1142.3 1300.0 2.17 359.21 1298.2 46.4 1242.2 1400.0 1.21 353.01 1398.2 48.5 1342.2 1500.0 .66 351.43 1498.1 49.5 1442.1 1600.0 .59 354.65 1598.1 50.2 1542.1 1700.0 1.28 30.83 1698.1 51.7 1642.1 1800.0 2.67 36.83 1798.1 55.1 1742.1 1900.0 4.98 42.57 1897.8 61.7 1841.8 2000.0 7.83 46.82 1997.2 72.9 1941.2 .18 .16 .13 .68 1.14 .96 1.41 .20 .03 .17 .2 .5 .8 1.0 2.6 6.5 12.6 20.1 27.7 35.4 165.1 148.5 131.0 86.8 32.0 17.6 14.3 13.8 13.6 13.3 .15 S .04 E .41 S .25 E .53 S .61 E .05 N .97 E 2.23 N 1.39 E 6.22 N 1.98 E 12.21 N 3.12 E 19.48 N 4.77 E 26.91 N 6.49 E 34.50 N 8.16 E .26 43.2 12.9 42.09 N 9.62 1.25 49.7 12.1 48.57 N 10.43 1.01 54.3 11.2 53.22 N 10.57 .98 57.1 10.5 56.16 N 10.41 .55 58.7 10.0 57.78 N 10.20 9.7 10.0 11.2 13.9 18.0 .O8 .88 1.40 2~34 2.89 59.7 61.3 64.4 70.3 80.0 58.86 N 10.06 E 60.33 N 10.59 E 63.16 N 12.55 E 68.21 N 16.88 E 76.07 N 24.78 E A Gy r o da t a D i r e B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" Location: SDI UNIT, ENDICOTT FIELD Job Number: AK0595G267 TUBING ALASKA MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet 2100.0 10.01 46.03 2096.0 2200.0 11.93 45.40 2194.2 2300.0 14.47 45.15 2291.5 2400.0 16.13 40.79 2388.0 2500.0 19.15 39.32 2483.2 2600.0 21.40 40.30 2577.0 2700.0 23.55 44.46 2669.4 2800.0 25.23 45.45 2760.5 2900.0 28.38 45.71 2849.8 3000.0 31.61 46.78 2936.4 3100.0 33.45 45.52 3020.7 3200.0 35.36 44.90 3103.2 3300.0 36.72 45.36 3184.0 3400.0 39.84 45.60 3262.5 3500.0 41.54 47.18 3338.3 3600.0 44.78 46.96 3411.3 3700.0 47.21 45.45 3480.7 3800.0 48.32 44.56 3548.0 3900.0 48.46 44.39 3614.4 4000.0 48.84 44.08 3680.4 4100.0 48.95 44.38 3746.2 4200.0 49.76 42.96 3811.3 4300.0 50.64 40.42 3875.3 4400.0 50.84 40.52 3938.6 4500.0 50.29 40.46 4002.1 88.3 107.3 130.1 156.5 186.8 221.4 259.6 300.8 345.9 395.7 449.4 505.8 564.6 626.5 691.5 759.7 831.4 905.4 980.1 1055.2 1130.5 1206.3 1283.1 1360.5 1437.7 SUBSEA DEPTH feet c t i ona 1 Survey DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. 2040.0 2.19 93.9 22.5 2138.2 1.92 111.7 26.4 2235.5 2.54 133.5 29.6 2332.0 2.02 159.3 31.7 2427.2 3.05 189.3 33.1 2521.0 2.27 223.8 34.1 2613.4 2.68 261.6 35.3 2704.5 1.73 302.4 36.6 2793.8 3.15 347.0 37.8 2880.4 3.28 396.5 38.9 2964.7 1.96 449.9 39.7 3047.2 1.94 506.2 40.3 3128.0 1.39 564.8 40.8 3206.5 3.12 626.6 41.3 3282.3 1.98 691.6 41.8 3355.3 3.24 759.7 42.2 3424.7 2.66 831.4 42.6 3492.0 1.29 905.4 42.8 3558.4 .19 980.2 42.9 3624.4 .45 1055.2 43.0 3690.2 3755.3 3819.3 3882.6 3946.1 .26 1130.5 43.1 1.35 1206..4 43.1 2.14 1283.2 43.0 .21 1360.6 42.9 .55 1437.7 42.8 Page 2 HORIZONTAL COORDINATES feet 86.76 N 36.01 100.06 N 49.62 116.13 N 65.84 135.46 N 83.78 158.67 N 103.25 185.28 N 125.45 213.46 N 151.25 242.68 N 180.43 274.23 N 212.63 308.78 N 248.76 346.05 N 287.52 385.86 N 327.62 427.37 N 369.32 470.80 N 413.50 515.75 N 460.71 562.34 N 510.78 612.13 N 562.68 664.48 N 615.03 717.83 N 667.41 771.61 N 719.78 825.60 N 772.34 E 880.48 N 824.73 E 937.85 N 875.82 E 996.75 N 926.07 E 1055.49 N 976.23 E A Gyro da t a D i r e c t i ona i S u r v e y B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" TUBING Location: SDI UNIT, ENDICOTT FIELD ALASKA Job Number: AK0595G267 Page MEASURED I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4600.0 49.57 41.12 4066.5 1514.2 4700.0 49.18 41.44 4131.6 1590.1 4800.0 48.42 41.68 4197.5 1665.3 4900.0 47.92 42.16 4264.2 1739.8 5000.0 47.20 42.11 4331.6 1813.6 4010.5 4075.6 4141.5 4208.2 4275.6 .88 1514.2 42.7 .46 1590.1 42.6 .78 1665.3 42.6 .62 1739.8 42.5 .72 1813.6 42.5 1113.42 N 1170.46 N 1226.76 N 1282.21 N 1336.94 N 1026.22 E 1076.29 P 1126.21 ~ 1175.99 E 1225.50 E 5100.0 47.33 42.01 4399.5 1887.1 5200.0 46.88 41.61 4467.6 1960.3 5300.0 47.34 41.93 4535.6 2033.6 5400.0 47.02 41.52 4603.6 2106.9 5500.0 47.55 39.98 4671.4 2180.4 4343.5 4411.6 4479.6 4547.6 4615.4 .15 1887.1 42.5 .53 1960.3 42.5 .51 2033.6 42.4 .44 2106.9 42.4 1.25 2180.4 42.4 1391.47 N 1446.08 N 1500.72 N 1555.46 N 1611.12 N 1274.71 E 1323.55 E 1372.36 E 1421.18 E 1469.13 E 5600.0 48.44 39.70 4738.4 2254.6 5700.0 48.70 38.93 4804.5 2329.5 5800.0 48.66 38.73 4870.6 2404.4 5900.0 48.23 38.93 4936.9 2479.1 6000.0 48.06 39.10 5003.6 2553.4 4682.4 4748.5 4814.6 4880.9 4947.6 .91 2254.6 42.3 .63 2329.5 42.2 .16 2404.5 42.1 .46 2479.2 42.0 .21 2553.6 41.9 1668.17 N 1726.17 N 1784.67 N 1842.97 N 1900.84 N 1516.74 E 1564.24 E 1611.33 E 1658.25 E 1705.13 E 6100.0 48.43 39.73 5070.2 2627.9 6200.0 47.86 41.49 5136.9 2702.4 6300.0 48.39 41.32 5203.7 2776.8 6400.0 48.12 41.54 5270.3 2851.4 6500.0 48.25 41.39 5336.9 2926.0 5014.2 5080.9 5147.7 5214.3 5280.9 .60 2628.1 41.8 1.43 2702.6 41.8 .55 2777.0 41.8 .32 2851.6 41.8 .17 2926.2 41.8 1958.47 N 2015.02 N 2070.88 N 2126.82 N 2182.67 N 1752.50 1800.97 E 1850.22 E 1899.59 E 1948.94 E 6600.0 48.05 41.67 5403.7 3000.4 6700.0 48.50 41.72 5470.2 3075.1 6800.0 48.59 42.25 5536.4 3150.0 6900.0 48.33 42.11 5602.7 3224.9 7000.0 48.41 42.18 5669.2 3299.6 5347.7 5414.2 5480.4 5546.7 5613.2 .30 3000.7 41.8 .46 3075..3 41.8 .40 3150.2 41.8 .28 3225.1 41.8 .09 3299.8 41.8 2238.43 N 2294.16 N 2349.86 N 2405.33 N 2460.75 N 1998.33 E 2047.98 E 2098.11 E 2148.37 E 2198.53 E A Gyro da t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" Location: SDI UNIT, ENDICOTT FIELD Job Number: AK0595G267 TUBING ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7100.0 48.13 41.84 5735.7 7200.0 48.10 42.11 5802.5 7300.0 47.98 41.89 5869.3 7400.0 47.87 41.46 5936.4 7500.0 48.06 42.00 6003.3 3374.2 3448.7 3523.0 3597.3 3671.5 5679.7 5746.5 5813.3 5880.4 5947.3 .38 3374.5 41.8 .20 3448.9 41.8 .20 3523.3 41.8 .34 3597.5 41.8 .44 3671.8 41.8 2516.20 N 2571.55 N 2626.81 N 2682.26 N 2737.68 N 2248.48 E 2298.27 ~ 2348.03 _ 2397.39 E 2446.82 E 7600.0 48.23 41.91 6070.0 7700.0 48.59 42.04 6136.4 7800.0 48.21 42.21 6202.8 7900.0 48.20 42.19 6269.5 8000.0 47.91 42.27 6336.3 3746.0 3820.8 3895.6 3970.1 4044.5 6014.0 6080.4 6146.8 6213.5 6280.3 .18 3746.2 41.8 . 38 3821 . 0 41 . 8 .40 3895.8 41.8 .02 3970.4 41.8 .30 4044.8 41.8 2793.07 N 2848.67 N 2904.14 N 2959.37 N 3014.45 N 2496.62 E 2546.64 E 2596.80 E 2646.88 E 2696.88 E 8100.0 47.62 42.50 6403.5 8200.0 46.80 41.96 6471.4 8300 . 0 45 . 30 41 . 73 6540 . 8 8400.0 43 . 65 41.23 6612.2 8500.0 42.87 41.97 6685.0 4118.6 4191.9 4263.9 4334.0 4402.5 6347.5 6415.4 6484.8 6556.2 6629.0 .34 4118.8 41.8 .91 4192.2 41.8 1.51 4264.2 41.8 1.68 4334.2 41.8 · 93 4402.7 41.8 3069.13 N 3123.46 N 3177.09 N 3229.57 N 3280.82 N 2746.79 E 2796.11 E 2844.14 E 2890.54 E 2936.05 E 8600.0 40.86 42.28 6759.5 8700.0 38.94 42.23 6836.2 8800.0 37.04 41.25 6915.0 8900.0 34.44 39.96 6996.2 9000.0 30.03 38.96 7080.7 4469.2 4533.4 4594.9 4653.3 4706.5 6703.5 6780.2 6859.0 6940.2 7024.7 2.02 4469.5 41.8 1.92 4533.6 41.8 1.99 4595.2 41.8 2 . 71 4653 . 6 41 . 8 4.44 4706.8 41.8 3330.31 N 3377.79 N 3423.71 N 3468.03 N 3509.18 N 2980.81' 3023.94 E 3064.92 E 3102.95 E 3136.86 E 9100.0 28.93 40.12 7167.8 9200.0 26.03 39.26 7256.5 9300.0 23.23 39.61 7347.4 9400.0 21.39 42.50 7439.9 9500.0 20.52 42.18 7533.3 4755.7 4801.8 4843.4 4881.3 4917.1 7111.8 7200.5 7291.4 7383.9 7477.3 1 . 23 4756 . 0 41 . 8 2.93 4802.1 41.8 2.81 4843.8 41.7 2 . 14 4881.7 41 . 7 .88 4917.5 41.7 3547.13 N 3582.63 N 3614.82 N 3643.45 N 3669.88 N 3168.18 E 3197.67 E 3224.13 E 3249.03 E 3273.11 E A Gyro d a t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" Location: SDI UNIT, ENDICOTT FIELD Job Number: AK0595G267 TUBING ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. H 0 R I Z O N T A L COORDINATES feet 9600.0 9700.0 9800.0 9900.0 10000.0 19.73 41.73 7627.2 19.64 42.22 7721.3 19.08 42.46 7815.7 18.19 44.07 7910.4 18.10 44.91 8005.5 4951.5 4985.2 5018.3 5050.3 5081.4 7571.2 7665.3 7759.7 7854.4 7949.5 .81 4951.9 41.7 .19 4985.5 41.7 .57 5018.7 41.7 1.03 5050.6 41.7 .28 5081.8 41.8 3695.47 N 3296.12 E 3720.51 N 3318.65 F 3745.02 N 3340.98 L 3768.30 N 3362.88 E 3790.51 N 3384.70 E 10100 10200 10300 10400 10500 .0 .0 .0 .0 .0 18.27 45.47 8100.5 18.87 44.16 8195.3 19.23 43.56 8289.8 19.36 42.75 8384.2 18.97 41.83 8478.6 5112.6 5144.4 5177.0 5210.1 5242.9 8044.5 8139.3 8233.8 8328.2 8422.6 .24 5112.9 41.8 .73 5144.7 41.8 .41 5177.3 41.8 .30 5210.4 41.8 .49 5243.2 41.8 3812.51 N 3835.10 N 3858.64 N 3882.74 N 3907.02 N 3406.84 E 3429.28 E 3451.90 E 3474.50 E 3496.59 E 10600 10700 1O8OO 10900 11000 .0 .0 .0 .0 .0 18.48 41.74 8573.3 18.19 41.28 8668.3 17.86 41.05 8763.4 17.56 40.48 8858.6 16.94 40.08 8954.1 5275.0 5306.4 5337.4 5367.8 5397.4 8517.3 8612.3 8707.4 8802.6 8898.1 .49 5275.3 41.8 .32 5306.7 41.8 .34 5337.7 41.8 .35 5368.1 41.8 .63 5397.7 41.8 3930.96 N 3954.51 N 3977.80 N 4000.84 N 4023.46 N 3517.98 E 3538.83 E 3559.20 E 3579.06 E 3598.23 E 11100 11200 11300 11400 11500 .0 .0 .0 .0 .0 16.53 39.83 9049.9 17.17 39.60 9145.6 17.31 39.61 9241.1 17.11 40.27 9336.6 16.86 40.78 9432.3 5426.2 5455.1 5484 . 7 5514.3 5543.5 8993.9 9089.6 9185.1 9280.6 9376.3 . 41 5426 . 5 41 · 8 .64 5455.5 41.8 . 14 5485 . 1 41 · 8 . 28 5514 . 7 41 · 8 .28 5543.9 41.8 4045.53 N 4067.82 N 4090.66 N 4113.34 N 4135.55 N 3616.72 I 3635.24 E 3654.14 E 3673.13 E 3692.11 E 11600 11700 11800 11900 12000 .0 .0 .0 .0 .0 15.89 41.24 9528.2 15.45 40.84 9624.5 15.62 40.33 9720.8 16.93 41.15 9816.8 16.29 42.33 9912.7 5571.7 5598.7 5625.4 '5653.4 5682.0 9472.2 9568.5 9664.8 9760.8 9856.7 .98 5572.1 41.8 .46 5599..1 41.8 .22 5625.8 41.7 1.33 5653.9 41.7 .72 5682.5 41.7 4156.83 N 4177.20 N 4197.54 N 4218.77 N 4240.10 N 3710.61 E 3728.35 E 3745.77 E 3764.06 E 3783.09 E A Gyro da t a D i r e c t i on a i Survey B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" Location: SDI UNIT, ENDICOTT FIELD Job Number: AK0595G267 TUBING ALASKA MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. 12100.0 16.14 42.69 10008.7 12200.0 16.44 42.37 10104.7 12300.0 16.49 42.70 10200.6 12400.0 16.74 42.70 10296.4 12450.0 16.41 42.36 10344.3 5710.0 9952.7 5738.0 10048.7 5766.3 10144.6 5794.9 10240.4 5809.2 10288.3 .19 5710.4 41.7 .32 5738.4 41.7 .10 5766.8 41.8 .25 5795.4 41.8 .70 5809.6 41.8 Final Station Closure: Distance: 5809.62 ft Az: 41.76 deg. Page 6 HORIZONTAL COORDINATES feet 4260.69 N 3801.96 4281.36 N 3820.92 4302.24 N 3840.08 4323.26 N 3859.48 4333.77 N 3869.12 E A Gyro data D i r e c t i ona i Survey for B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" TUBING Location: SDI UNIT, ENDICOTT FIELD ALASKA Job Number: AK0595G267SS Run Date: 29-May-95 07:19:37 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.342000 deg. N Sub-sea Correction from Vertical Reference: 56 ft. Azimuth Corrected:: Gyro: Bearings are Relative to True North Proposed Well Direction: 42.440 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" Location: SDI UNIT, ENDICOTT FIELD Job Number: AK0595G267SS TUBING ALASKA SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. -56.0 0.00 0.00 0.0 0.0 0.00 0.0 0.0 ALL MEASURED DEPTHS REFRENCED TO R.K.B. (HEIGHT 56'). 0.0 - 12450.0 FEET; GYRODATA SURVEY RUN IN 4 1/2" TUBING. Page HORIZONTAL C O O R D I N A T E S feet 0.00 N 0.00 E 100 . 0 . 21 141 . 60 156 . 0 - . 1 . 17 200 . 0 . 22 105 . 13 256 . 0 - . 0 . 14 300.0 .49 49.66 356.0 .4 .44 400 . 0 1 . 34 12 . 27 456 . 0 1 . 8 . 94 500 . 0 2 . 37 8.38 556 . 0 4 . 5 1.04 600.0 3.58 10.61 656.0 8.8 1.21 700.0 4.29 12.84 756.0 14.8 .72 800 . 0 4 . 38 12 . 99 856 . 0 21 . 4 . 10 900 . 0 4 . 46 12 . 35 956 . 0 28 . 1 . 11 1000 . 0 4 . 42 10 . 73 1056 . 0 34 . 7 . 22 1100.0 3.66 6.12 1156.0 40.6 .83 1200.0 2.59 .99 1256.0 44.9 1.11 1300.0 1.62 355.63 1356.0 47.6 .99 1400.0 .89 352.10 1456.0 49.1 .73 1500.0 .62 353.29 1556.0 49.9 .28 1600.0 .99 15.59 1656.0 51.1 .54 1700.0 2.08 34.30 1756.0 53.6 1.18 1800.0 4.01 40.16 1856.0 58.9 1.94 1900.0 6.64 45.06 1956.0 68.2 2.66 2000.0 9.13 46.35 2056.0 82.1 2.47 .5 155.8 .8 138.7 1.0 106.2 2.6 56.1 6.5 23.9 12.6 15.8 20.1 14.0 27.7 13.6 35.4 13.4 43.2 13.1 49.7 12.4 54.3 11.6 57.1 10.8 58.7 10.2 59.7 9.8 61.3 9.8 64.4: 10.7 70.3 12.8 80.0 16.3 93.9 20.7 .30 S .16 E .48 S . .45 E .26 N .81 E 1.27 N 1.21 E 4.47 N 1.72 E 9.59 N 2.62 E 16.31 N 4.05 E 23.70 N 5.74 E 31.24 N 7.44 E 38.85 N 9.00 E 45.82 N 10.09 E 51.26 N 10.51 E 54.92 N 10.48 E 57.10 N 10.29 E 58.41 N 10.12 E 59.71 N 10.37 E 61.97 N 11.73 E 66.09 N 15.07 E 72.81 N 21.51 E 82.43 N 31.46 E A Gyrodata B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" Location: SDI UNIT, ENDICOTT FIELD Job Number: AK0595G267SS TUBING ALASKA Directional SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. 2100.0 11.19 45.64 2156.0 2200.0 13.54 45.24 2256.0 2300.0 15.58 42.23 2356.0 2400.0 18.29 39.74 2456.0 2500.0 20.89 40.08 2556.0 2600.0 23.24 43.85 2656.0 2700.0 25.15 45.40 2756.0 2800.0 28.61 45.79 2856.0 2900.0 32.04 46.49 2956.0 3000.0 34.27 45.25 3056.0 3100.0 36.25 45.20 3156.0 3200.0 39.59 45.58 3256.0 3300.0 42.33 47.12 3356.0 3400.0 46.34 45.99 3456.0 3500.0 48.34 44.54 3556.0 3600.0 48.70 44.19 3656.0 3700.0 49.07 44.17 3756.0 3800.0 50.38 41.19 3856.0 3900.0 50.69 40.51 3956.0 4000.0 49.69 41.02 4056.0 99.9 121.8 147.8 178.1 213.6 254.0 298.8 349.5 408.2 473.6 544.2 621.3 708.0 805.9 914.5 1027.4 1141.9 1260.0 1381.7 1501.7 1617.9 1730.7 1840.0 1947.9 2055.6 4100.0 48.90 41.53 4156.0 4200.0 47.98 42.10 4256.0 4300.0 47.25 42.07 4356.0 4400.0 46.96 41.68 4456.0 4500.0 47.24 41.81 4556.0 2.03 111.7 24.9 2.31 133.5 28.4 2.19 159.3 31.0 2.76 189.3 32.7 2.45 223.8 33.9 2.62 261.6 35.1 1.77 302.4 36.6 3.16 396.5 37.9 2.97 449.9 39.1 1.95 506.2 40.0 1.58 564.8 40.7 2.98 626.6 41.3 2.29 759.7 41.9 2.87 831.4 42.5 1.16 980.2 42.8 .35 1055.2 43.0 .42 1206.4 43.1 1.90 1283.2 43.1 .30 1437.7 42.9 .83 1514.2 42.7 .57 1665.3 42.6 .64 1739.8 . 42.5 .52 1887.1 42.5 .47 1960.3 42.5 .49 2106.9 42.4 Survey Page HORIZONTAL COORDINATES feet 94.89 N 44.33 E 110.27 N 59.93 E 129.05 N 77.83 E 152.04 N 97.68 E 179.31 N 120.47 E 209.36 N 147.49 E 241.23 N 178.98 E 276.72 N 215.24 E 317.46 N 257.79 E 363.10 N 304.70 E 412.98 N 354.87 E 467.20 N 409.83 E 527.04 N 472.84 E 594.40 N 544.20 E 670.94 N 621.38 E 751.73 N 700.42 E 833.89 N 780.25 E 920.53 N 860.40 E 1012.83 N 939.81 E 1103.97 N 1018.07 E 1191.31 N 1275.42 N 1356.51 N 1436.80 N 1517.13 N 1094.78 E 1169.90 E 1243.16 E 1315.25 E 1387.00 E A G y r o d a t a B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" Location: SDI UNIT, ENDICOTT FIELD Job Number: AK0595G267SS TUBING ALASKA Direct i o n a 1 Survey Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 4600.0 47.43 40.33 4656.0 4700.0 48.51 39.50 4756.0 4800.0 48.67 38.77 4856.0 4900.0 48.18 38.98 4956.0 5000.0 48.35 39.59 5056.0 5100.0 48.01 41.44 5156.0 5200.0 48.18 41.49 5256.0 5300.0 48.19 41.47 5356.0 5400.0 48.40 41.71 5456.0 5500.0 48.51 42.21 5556.0 2163.7 2274.6 2387.9 2500.4 2612.0 2723 . 6 2835.4 2947.2 3059.1 3172.1 1.06 .84 .26 .39 .52 1.18 .37 .21 .42 .37 2180.4 42.4 2329.5 42.3 2404.5 42.1 2553.6 42.0 2628.1 41.8 2777.0 41.8 2851.6 41.8 3000.7 41.8 3075.3 41.8 3225.1 41.8 1598.46 N 1683.64 N 1771.77 N 1859.53 N 1946.17 N 2030.97 N 2114.83 N 2198.60 N 2282.25 N 2366.2'4 N 1458.22 E 1529.40 E 1600.95 E 1671.67 E 1742.39 E 1815.03 E 1889.01 E 1963.05 E 2037.37 E 2112.95 E 5600.0 48.39 42.17 5656.0 5700.0 48.12 41.92 5756.0 5800.0 48.01 41.93 5856.0 5900.0 47.93 41.62 5956.0 6000.0 48.19 41.93 6056.0 6100.0 48.48 42.09 6156.0 6200.0 48.21 42.19 6256.0 6300.0 47.82 42.34 6356.0 6400.0 46.98 42.08 6456.0 6500.0 44.95 41.62 6556.0 3284.8 3396.8 3508.2 3619.0 3730.3 3842.8 3955.1 4066.2 4175.2 4278.8 .13 .32 .20 .37 .24 .39 .10 .31 .78 1.54 3299.8 41.8 3448.9 41.8 3523.3 41.8 3671.8 41.8 3746.2 41.8 3895.8 41.8 3970.4 41.8 4118.8 41.8 4192.2 41.8 4334.2 41.8 2449.77 N 2533.01 N 2615.78 N 2698.52 N 2781.41 N 2865.03 N 2948.22 N 3030.48 N 3111.11 N 3188.23 N 2188.59 E 2263.60 E 2338.09 E 2411.89 E 2486.14 E 2561.43 E 2636.78 E 2711.51 E 2784.90 E 2853.99 E 6600.0 43.18 41.68 6656.0 6700.0 40.96 42.26 6756.0 6800.0 38.46 41.98 6856.0 6900.0 35.73 40.60 6956.0 7000.0 31.32 39.26 7056.0 4375.2 4466.1 4548.8 4624.4 4690.9 1.23 1.97 1.94 2 .35 3 .93 4402.7 41.8 4469.5 . 41.8 4595.2 41.8 4653.6 41.8 4706.8 41.8 3260.39 N 3327.99 N 3389.32 N 3446.09 N 3497.14 N 2917.91 E 2978.71 E 3034.23 E 3084.12 E 3126.94 E A Gyrodata Di B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" TUBING Location: SDI UNIT, ENDICOTT FIELD ALASKA Job Number: AK0595G267SS r e c t i o n a 1 SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. 7100.0 29.08 39.96 7156.0 4749.0 7200.0 26.05 39.27 7256.0 4801.5 7300.0 23.05 39.88 7356.0 4846.9 7400.0 21.24 42.45 7456.0 4887.5 7500.0 20.33 42.07 7556.0 4925.4 7600.0 19.70 41.88 7656.0 4961.8 7700.0 19.44 42.31 7756.0 4997.3 7800.0 18.70 43.15 7856.0 5031.9 7900.0 18.15 44.48 7956.0 5065.2 8000.0 18.19 45.21 8056.0 5098.0 8100.0 18.62 44.70 8156.0 5131.2 8200.0 19.10 43.78 8256.0 5165.3 8300.0 19.32 42.99 8356.0 5200.2 8400.0 19.06 42.05 8456.0 5235.0 8500.0 18.57 41.76 8556.0 5269.1 8600.0 18.23 41.34 8656.0 5302.4 8700.0 17.88 41.07 8756.0 5335.0 8800.0 17.57 40.50 8856.0 5366.9 8900.0 16.93 40.07 8956.0 5398.0 9000.0 16.57 39.82 9056.0 5428.0 9100.0 17.18 39.60 9156.0 5458.3 9200.0 17.28 39.71 9256.0 5489.3 9300.0 17.06 40.37 9356.0 5520.2 9400.0 16.62 40.89 9456.0 5550.4 9500.0 15.77 41.12 9556.0 5579.5 1.67 4756.0 41.8 2.92 4802.1 41.8 2.75 4881.7 41.7 1.92 4917.5 41.7 .86 4951.9 41.7 .62 4985.5 41.7 .33 5018.7 41.7 .76 5050.6 41.7 .67 5081.8 41.8 .26 5112.9 41.8 .53 5144.7 41.8 .53 5177.3 41.8 .33 5210.4 41.8 .44 5243.2 41.8 .49 5275.3 41.8 .35 5306.7 41.8 .34 5337.7 41.8 .35 5368.1 41.8 .63 5426.5 41.8 .43 5455.5 41.8 .59 5485.1 41.8 .16 5514.7 . 41.8 .28 5543.9 41.8 .46 5572.1 41.8 .83 5599.1 41.8 Survey Page HORIZONTAL COORDINATES feet 3541.99 N 3163.94 E 3582.43 N 3197.50 E 3617.48 N 3226.45 E 3648.01 N 3253.18 E 3676.07 N 3278.68 E 3703.13 N 3303.01 E 3729.51 N 3326.85 E 3754.92 N 3350.30 E 3778.95 N 3373.34 E 3802.21 N 3396.48 E 3825.74 N 3419.99 E 3850.22 N 3443.81 E 3875.54 N 3467.75 E 3901.20 N 3491.29 E 3926.57 N 3514.06 E 3951.47 N 3536.13 E 3976.00 N 3557.62 E 4000.20 N 3578.51 E 4023.89 N 3598.59 E 4046.95 N 3617.91 E 4070.31 N 3637.30 E 4094.20 N 3657.10 E 4117.84 N 3676.97 E 4140.81 N 3696.69 E 4162.71 N 3715.73 E A Gyro da t a D i r e c t i on a I Survey B.P. EXPLORATION WELL: SDI UNIT 3-37 / L35I, 4 1/2" Location: SDI UNIT, ENDICOTT FIELD Job Number: AK0595G267SS TUBING ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 9600.0 15.51 40.67 9656.0 9700.0 16.10 40.63 9756.0 9800.0 16.67 41.63 9856.0 9900.0 16.22 42.49 9956.0 10000.0 16.29 42.54 10056.0 5607.4 .5635.7 5665.1 5694.6 5723.8 38 63 O8 48 25 5625.8 41.7 5653.9 41.7 5682.5 41,7 5710.4 41.7 5738.4 41.7 4183.86 N 4205.32 N 4227.49 N 4249.40 N 4270.88 N 3734.04 E 3752.47 E 3771.84 E 3791.61 E 3811.31 E 10100.0 16.47 42.55 10156.0 10200.0 16.64 42.70 10256.0 10288.3 16.41 42.36 10344.3 5753.2 5782.9 5809.2 .20 .19 .70 5766.8 41.7 5795.4 41.8 5809.6 41.8 4292.54 N 4314.40 N 4333.77 N 3831.18 E 3851.31 E 3869.12 E Final Station Closure: Distance: 5809.62 ft Az: 41.76 deg. gyro/data 4. QUALITY CONTROL · SR267.DOC Quality Control Comparisons B.P. EXPLORATION WELL: 3-37/L35I, 4 Location: SDI UNIT, 1/2" TUBING ENDICOTT FIELD ALASKA Job Number : AK0595G267 / AK0595G267 INRUN/OUTRUN Comparison INRUN OUTRUN Depth Inc Inc Delta 1000.0 4.63 4.53 .101 2000.0 7.64 7.83 -.191 3000.0 31.52 31.61 -.096 4000.0 48.85 48.84 .012 5000.0 47.41 47.20 .210 6000.0 48.16 48.06 .100 7000.0 47.98 48.41 -.434 7000.0 48.45 48.41 .039 9000.0 30.24 30.03 .210 10000.0 18.24 18.10 .138 11000.0 17.06 16.94 .121 12000.0 16.40 16.29 .109 12450.0 16.41 16.41 .001 INRUN Az 10.51 46.99 46.76 43.80 42.91 39.38 42.37 41.98 39.49 45.40 40.91 43.26 42.27 For Inclinations Greater than 10 degrees: Average Inclination Difference = .03739 deg. Average Azimuth Difference = .31408 deg. OUTRUN Az 12.00 46.82 46.78 44.08 42.11 39.10 42.18 42.18 38.96 44.91 40.08 42.33 42.36 Delta -1.494 .168 -.025 -.274 .795 .277 .188 -.198 .526 .492 .829 .933 -.088 gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK0595G267 TOOL NUMBER: 080 MAXIMUM GYRO TEMPERATURE: 83.1c MAXIMUM AMBIENT TEMPERATURE: 102.5 c MAXIMUM INCLINATION: 48.6 AVERAGE AZIMUTH: WIRELINE REZERO VALUE: REZERO ERROR / K: 356.0 -7.0 n/a CALIBRATION USED FOR FIELD SURVEY: 12 May, 1995 CALIBRATION USED FOR FINAL SURVEY: PRE JOB MASS BALANCE OFFSET CHECK: POST JOB MASS BALANCE OFFSET CHECK~ · CONDITION OF SHOCK WATCHES 12 May, 1995 -0.09 -.00 0.1 USED -0.0 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEZ: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY 12450 16.41 42.36 10344.3 4333.8 N 3869.1E FINAL SURVEY 12450 16.41 42.36 10344.3 4333.8 N 3869.1E SR267.DOC gyro/data FUNCTION TEST JOB NUMBER: AK0595G267 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 3400 39.8 39.8 39.8 39.8 39.8 AZIMUTH M.D. ft 1 2 3 4 5 3400 45.8 45.8 45.8 45.7 45.8 SR267.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR267.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK0595G267 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 080 GYRO SECTION A00 DATA S ECTI O N A0025 POWER SECTION A0052 BACKUP TOOL No. 136 GYRO SECTION A00 DATA SECTION A0029 POWER SECTION A0027 COMPUTER POWER SUPPLY PRINTER INTERFACE COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0055 A0079 A0035 A0122 A0036 A0029 A0035 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 15/16 RUNNING GEAR 2 1/2" System w/3" heat shield and eccentric bar, and 3.6" wear bushings. TOTAL LENGTH OF TOOL: MAXIMUM O.D.: TOTAL WEIGHT OF TOOL: 25.5 feet 3.6 INCHES 250Lbs SR267.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK0595G267 5/2895 0730 0930 1100 1500 5/29/95 0715 0745 0830 0900 1030 1230 1430 1515 1620 1720 5/30/95 0800 0945 KUPARUK AIR STRIP W EQUIPMENT ERA TO DEADHORSE ATLAS, CHECK TOOLS O.K. STAND BY FOR ENDICOTT 3-37/L-351 LEAVE FOR SDI UNIT. ARRIVE LOCATION, MU TOOL PU TOOL, ZERO. MU LUBRICATOR RIH. HIGH STRAND 1035', INSPECT, CONTINUE IN HOLE. 12450' 7900'. 2400' LD TOOL. RD ATLAS AND BD TOOL, PROCESS SURVEY. RTN ATLAS CHECK TOOL O.K. OTTER TO KUPARUK CHARTER TO ANCHORAGE SR267. DOC LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 8 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, ~ Enclosed, please find the data as described below: · ~_~ - ' ~ ' - ........... ~'- 2-08/K-16 ~I ';;:~::}'~--;'~ ~;:;-~-1 PLS FIN~ BL+~ -'.-/ _:'~.~..'Run ~ l~'~J~:-~< 6175.06.-~:~ /. _:.'.. ~_~_3:~ 3-37/L-35 .".- :'?::. _.?~', .... ,.:75~'1 PLS FIN~ ::~;-3~'~; ~Q -i ............ ' ' - : ' ': ' - -z. _ ' ' " "' ~ ': } '- ' '7""-~ = ~:?' "~¢~'~v' :_.. 3-37/L-35 :-'~_"~::'_y ....... :.'-._. 1 PFC/PE~ FIN~ BL~ Run ~ 1 ::,..,,-~-;-:-~--. ,. : '4232/K-38 (SDI) 1 PLS FIN~ BL+~ -_ ' ' Run ~ 1 ;.':.%:~¢6 52.07 1 PLS FIN~ BL+~ ' Run ~ 1 .... ~;:;.~: ..... :7-:::. .: .... . . .. . ;: , . ........ Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street S ite 201 ' Anchorage, AK 99518 __ . Or FAX to (907) 563-7803 Received by:. ~~ /-~~ Date: ~ ~_ ' -:~-'~-'~-7-'-:~ :-' ~ '~::- .......................................... LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 29 August 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL z-29/M-25 DESCRIPTION 1 PDK FINAL BL+RF I PLS FINAL BL+RF I PDK FINAL BL+RF I PDK FINAL BL+RF I PFC/PERF FINAL BL+RF ECC No. Run # i 5725.05 Run # i 5764.07 Run # 1 6092.03 Run ~ 1 6146.01 Run # 1 6432.05 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 RECEIVED ~ ~,/ /5 *~ to {907> s63-7803 SEP ............... / /- -/-/ //- ' ........ ~aska Oit & ~s Oo~S. .;. ' · LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam,~~ 0/~//~ Reference: /~ ~ BP / 3-37/L-35 ENDICOTT ~ NORTH SLOPE, AK Date: RE: 16 August 1995 Transmittal of Data ECC #: 6432.04 Sent by: ANCH.EXPRESS Data: PLS Enclosed, please find the data as described below: Prints/Films: 1 PLS FINAL BL+RF Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services / Anchorage, AK 99518 Received by:~/ /~~ Date: % LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 25 May 1995 Transmittal of Data ECC #: 6432.00 Sent by: PRIORITY MAIL Data: OH-LDWG Dear Sir/Madam, Reference: 3-37/L-35 END I COTT NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE + LIS Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please s i~ and return Petrotechnical Data Center BP Exploration (Alaska) Ino ?00. Eas~//Benson Boulevard ~, ~ .~_ ..~ D JUN 0 9 1995 Alaska 0ii & Gas Cons. Commission Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 6 June 1995 Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PFC/PERF FINAL BL+RF' Run # 1 1 PFC/PERF FINAL BL+RF Run # 1 , 1 PFC/PERF FINAL BL+RF Run # 1 1 GR/CCL FINAL BL+RF Run # 1 ECC No. 5756.05 6034.05 6432.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please si~n and ~eturn to~ petrotechnical Data Cen~eV a EXploration (Alaska) In~ 0 Eas% Benson Boulevard ge, ~ka 99508 .' 0 8 . · ~ ~ Alas~-0ii &. ~ 8~s. G0mmissi0~ Anoh0ra~8 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 1 June 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PDK FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 SBT/GR FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 3842.06 5756.04 6006.04 6185.12 6432.02 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 "Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please siEn and Petrotechnical. Data Cente~ BP E~loration (Alaska) InS ~O~ast Benson Boulevard R~celved by .... ' -- ..... '- JUN 0 8 1995 ' Alaska Oil & Eias Co~s. Commission Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 22 May 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 DIFL/GR FINAL BL+RF 1 ZDL/CN/GR FNL BL+RF 1 SSVD FINAL BL+RF 1 BH PROFILE FNL BL+RF 1 FMT/GR FINAL BL+RF Run # 1 Run ~ 1 Run # 1 Run # 1 Run # 1 ECC No. 6432.00 6432.01 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street .Suite 201 /~ Anchorage, AK 99518  907) 563-7803 Received by: ~ ~~. Date: Please sig~ and return Fetrotechntcal Data Oente~ BP Exploration (Alaska) 900 East Benson Boulevard ,, ~~ Dat~ sion ALASKA OIL AND GAS · CONSERVATION COMMISSION TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 April 13, 1995 R. B. Laule Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O'Box 196612 Anchorage, AK 99519-6612 Re: DUck Island Unit/Endicott 3-37/L-35 BP Exploration (Alaska), Inc. Permit No: 95-51 Sur. Loc. 2773'NSL, 670'WEL, Sec. 8, TllN, R17E, UM Btmhole Loc. 1930'NSL, 1926'WEL, Sec. 4, TllN, R17E, UM Dear Mr. Laule: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing .shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. BY ORDER OF~F~OMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA : ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill FIIlb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen []1 Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration BKB=56 feet Endicott Field/Endicott Pool 3. Address 6. Property Designation P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 47503 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 2773' NSL, 670' WEL, SEC. 8, T11N, R17E Duck Island Unit/Endicott At top of productive interval 8. Well number Number 1850' NSL, 2000' WEL, SEC. 4, T11N, R17E 3-37/L-35 2S100302630-277 At total depth 9. Approximate spud date Amount 1930' NSL, 1926' WEL, SEC. 4, T11N, R17E 4/17/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 47502-3354' feet 3-39/J-39-10.6' @ 551'MD feet 2560 12585' MD/10436' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 650 feet Maximum hole angle 48.2 o Maximum surface 3900 psig At total depth (TVD) 10000'/4890 psig 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 30" Struct. Drive Pipe 90' 40' 40' 130' 130' Drive 13-1/2" 10-3/4" 45.5# NT80 BTC 5063' 37' 37' 5100' 4383' 1600 sx "G''/150 sx PF "E" 9-7/8" 7-5/8" 29.7# NT95HS NSCC 12548' 37' 37' 12585' 10436' 298 sx Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate Production APR 1 2 1995 Liner AJaska 0il & Gas Cons. Commission Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[-1 20 AAC 25.050 requirementsl-I 21. I hereby certify' that the foregoing is true and correct to the best of my knowledge Date Commission Use Only Permit Number APl number Approval da.t~ See cover letter ~<"-r.~'/' 5 O- ,2 .~. ?- 2.- ~ 5'5' 4/' /-////~ /~ ~,-- for other requirements Cohditions of approval Samples required [] Yes ,~ No Mud Icg required []Yes 'I~ No Hydrogen sulfide measures ~ Yes [] No Directional survey required ~ Yes [] No Required working pressure for DOPE []2M; FI3M; 1~5M; []1OM; []15M; Other: driginal Signed By by order of Approved by 0avid W. Johnston Commissioner me commission Date Form 10-401 Rev. 12-1-85 Submit plicate 3-37/L-~5 Drilling Hazards and Risi~s · Differential reservoir pressures of 700 psi are anticipated between the Kekiktuk sands due to offset production and injection operatic~n~. · Kekiktuk could be at origin=i ro,sorvoir pre,s,sure due to hydraulic discontinuities. · Kekiktuk could come in higher than expected. · Kekiktuk could have gas cap, Expect 5 feet. I Well Name: 13-37/L35i I Well Plan Summary I Type of Well (producer or injector): [Prod/SeaWater Injector. Surface Location: 2773 FSL 670 FEL S08 T11N R17E UM Target Location: 1850 FSL 2000FEL S04 TI 1N R17E UM Bottom Hole 1930 FSL 1926 FEL S04 T11N R17E UM Location: AFE Number: 717494 Rig: I DOYON #15 I Estimated Start Date: 1 4/17/94 I I MD: 1~2,$85 I Operating days to complete: 119 I ITVD: I10,436 I IKBE: 156.°°' I IWell Design (conventional, slimhole, etc.): Slimhole, Longstring, 4-1/2" L-80 tbg comp. Formation Markers: Formation Tops MD TVD Pressure Estimate (psi/ppg (BKB) Permafrost 1471' 1466' Surface Csg Pt 5092' 4383' Cretaceous 9715 7610 SeaBee 10187 7960 3480 psi/8.4 ppg EMW Tuffs 11409 9331' HRZ 11776' 9676' Itkilyariak NONE NONE Kekiktuk - 3A 12069' 9951' 4500 psi/8.7ppg EMW Kekiktuk- 3B 12134' 10012' 4650 psi/8.9 ppg EMW 2M 12293' 10161' TARGET 12340 10206 Kekiktuk - 2A 12340' 10206' 4300-4900 psi/8.2-9.5 ppg EMW TD 12585' 10436' EiVED APR 1 2. 1995 L I g/I DI" as'n--~'u-'ng Program: ^~a~ oil aAnchorase(ias Cons. Commission Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg MD/TVD MD/TVD O.D. Driven 30" Struct. WLD Preset GL Preset 13-1/2" 10-3/4" 45.5# NT-80 BTC 5063 37' MD 5100/4383 9-7/8" 7-5/8" 29.7# NT-95HS NSCC 12548' 37' MD 12585/10436 TBG 4-1/2" 12.6# L-80 NSCT 11,700' 37' MD 11737/9623 Logging Program: I Open Hole Logs: SURFACE DIRECTIONAL (MWD & GYRO) INTERMEDIATE PRODUCTION DIRECTIONAL MWD; E/Line logs - DIL/MSFL/LDT/CNL/GR + FMT SBT ICased Hole Logs: 3-37/L35iWell Plan DKC Version FINAL Page 2 Date Revised' 4/12/95 Mud Program: ISpecial design considerations Fresh water lightly dispersed mud to TD Surface Mud Properties: [SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.7 300 40-60 30-60 60-80 9-10 15-25 csg pt. 9.2 100 20-40 15-20 20-30 9-10 15-25 Intermediate Mud Properties: [ Fresh / lightly dispersed Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.2-10.2 50 15-25 12-15 25-30 9.5-10 < 12 9.4 @ Cret Production Mud Properties: I Fresh/lightly dispersed Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.8-10.2 50-60 20-30 12-15 25-30 9.5-10 < 6 10.2 @ Kek Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on f'fle with AOGCC. Directional'. IKOP: I KOP @ 650' departure = 5957' @ TD I Maximum Hole Angle: 48.2DEG; 42.44 DEG Azimuth Close Approach Well: 3-39/J-39 CLOSEST POINT 10.6' @ 551MD The above listed wells will be secured during close approach. NOTE: DEEP INTERSECTIONS 4-38/K-34 & 3-33/K-37 BOTH PASSED THE DEEP INTERSECTION RISK ANALYSIS Disposal: Annular Injection: The Doyon solids handling unit will be utilized for the entire well. injected should be hauled to CC-2A. All other cuttings that cannot be DO NOT EXCEED 35,000 BBLS IN ANY ANNULUS. Maximum injection rate is 3 BPM and maximum volume is 1,000 bbls in any 24 hr period. Maximum injection pressure is 2000 psi. The following well(s) are approved for annular injection: AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED VOL (aBES) (aBES) END-SDI 4-10/M-28 0 35,000 1-1-95 thru 12-31- 95 4-38/K-34 0 35,000 1-1-95 thru 12-31- APR 1 2 1995 0il & Gas Cons. Commission ~ch0ra~e 3-37/L35iWell Plan DKC Version FINAL Page 15 Date Revised: 4/12/95 4:B- ~i_CEMiINT PROGRAM - HALLE CASING I,UZA._L~ C~M~/qT T~p~t ~yl~ 't? W~Ii~I-rT,- 12,0 i~g ~I~LI~, 2..17 f*./.qx MD/. WATER: 11.53 APPROX, ~At:KS: 7,~11 TIIIC~NINO TIME; 5, ius ADDITIVe: ~tard~ W EIt,/l.l~ 12.0 ppg YIELD: 2.i~ ft~/~ APPROX, SACKS~ M1X WATER: 1i,63 ~s acc~leza6~-a~ro~at~ly 40 - ~ F. l, Clad slay w/lO% ~e~ over ~u~ hole, 2. '1'~ ~uay to ~' w/~k ea~e~ vv~ ~ge hole, ' "zJi/~E~II~DUCTION C..A.SING ~ 7 5/8', 29,?# ZML_~ ~: ADDITIVESt 0.1% CFR-3 (Dispersanl). 0,45% H~-~ (Plum T.~s) + HR.5 ~GHT: 15.8 ppg ~,D~ i .15 f0/~X MIX WATE~ 5.0 SACKS: ~8 ~ ~ 4 ~ R~a~P ~) e~en~at~ w~ be bas~ ~ acLual lab SPACI~R$! Pump 20 bbln ~:~.~h Wahl; 7il hhl.q N.qC.! (H~trt~) ~ncer · 11 pp~. ~.~~~.~'.J:lI)~, B~x ~ ~ si~t7. D~pa~ at 14 b~ with ri~ ~mp~, ~E.~.~ Taft ~1~ ~o 1000' ~ve t~ Put Wet w/5~ ~ + Hil tr. sho~. ~e ~lh~mt~d ~ of tile Put ~ver ~ 12~'. 3-37/k35iWelf Plan DKC. Version FINAL Page 16 Dat~ Revised: 4112/95 OPERATIONS SUMMARY: Dig out cellar, Weld on landing ring. Ensure landing ring is the proper height with Endicott Field personel. MIRU Doyon 15. Hold pre spud meeting with crew. Drill 13-1/2" surface hole with KOP at 1700'. Use gyro for close approach until magnetic interference is past. Check with Anadrill & Gyrodata to insure they are following JORPS. Drill hole to 5092' TVD. This will put the build section and the gravels behind surface casing. Run 10-3/4" 45.5 ppf surface casing Cement surface casing. Perform top job, if necessary with 150 sx Type "E" Permafrost cement. ND diverter. NU Bop's & test. Drill out shoe and perform LOT. Perform open hole FIT 1000' below surface casing shoe. Directionally drill production hole to 10,311 TVD. Well site geologist will help pick final TD (175' below lower most possible perforation in 2A). A PDC should be picked up as the second 9-7/8" bit and drill the top 200-300' of the Tuffs. Have sample catchers and well site geologist on site before drilling the Kekiktuk. Use key seat wiper for Tuffs and HRZ. RU E/Line & run open hole logs ("Triple Combo" ). Run 7-5/8" production casing. Turbolators should be 2 per joint on the bottom 1000' of casing. If the cement job goes as planned, bond logs will not be run. Run 4-1/2" L-80 completion with hydraulic set permanent packer with WLEG 150' above the top of Kekiktuk (estimated WLEG @ 10,925' MD). ND Bop's. NU 4-1/16" 5M# tree. Set packer and test. Freeze protect tbg. RD MO Rig. RECEIVED APR 1 2 1995 Oil & Gas Cons. ~ommisslon Anchora,~e i SHARED S-ERv TCE S DR IL"l- T NG ...... ....... ~ ...! i,,, , [ Ill [ Ill [11 .ql II I I ~,~ o~- r, 'i" ' 3--37/L' 35i '(P10) L -D~C VERTICAL SECTION VIEW;' ~-- A , DRIL 'I-ITY-D N i ~ ~ ~ .,i ~oo-- ~-- I F~A,~ P~ s~ct~n ~' ~.~ ~ . . .. ~.- SDT AppRp, y]~R FOR TVD Scale,' ~-]nch = ~200 feet ~2oo-- Bep Scale.' ~ inch = ~200 feet 1800 F "- _ ...... ~ ............. , , :_ · ........ , ............. ::' ~ . ~nad~i]~ Schlu~be~ e~ .. ' i i i Il [ ' ' E) END i/lO0 DROP ]400 ~39B 39 O:.O0 ~600 '~'~CZ ~ : __ 6) END ~.5/~00 BUILD 3628 9407 603. 4~.20 , ~ I) OAOP 2.5/1oo ' 8~2 5~6~ .:~22t 48.20 ' d) END 2.5/J00 O~P ~340 7387: ,=oo=~,~,_=~¢1~ 7 ~---: T ~) 'D '25B5 1043B '5957 ~O.00 ~ : . : I · " ~,, , ,, . : ~ I - : i [ :' i I 6600 ...... ; ' ....... ~-~ } '-~i .... } '" , - ..,~ 7~00 ,,.~ ~ .. ., ECEIVE[) ': , g000 96oo-- , · ~ ._ , ,~, . ,, . ......... ~ . ..~. -:-:-__._: ..... 0 500i 1~00 1800 2400 ~000 3600 4200 ~800 , ~ : ~ . : . Sectlon Bepaptupe 54oo 6ooo 6soo 72oo.: , 78oo B a I ___ Harker Identification Al KB BI NUO~ BU.TLO E} FI Gl HI ,.'} K) END 1.5/~00 BUILD DROP 1/~00 END t/tO0 KOP BUILD 2,5/]00 END 2.5/~00 BUILD 10-3/4" CASING POINT ~ARGCT-250 FT RADIUS 500 0 500! <- WEST' EAST -> ! . MD N/S 0 0 350 0 650 12 950 35 2400 53 2700 53 3628. 617 5092 '~422 B2J2 9340 360~ 12340 4358 ~2585 4~20 SERVZ(jES ~ii ii i 0 516 125~ 2822 3245 3937 39B4 DRILLT,NG- - . mm ill ii i ~ . _ _ ' iiii ii ii i i 3-37/L-35i (Plo) :PLAN VIEW- · mi CLOSURE · 5957' feet at Azimuth'42:. DECLINATION.' 2.9.841 E SCALE ' I inc.h = IOOO feet DRANN · 04/J. 0/95 --- il-- i i ..... /nadri ]]' $ch]umb~r'.gsr m ---- ii ........ .... ~ ,~' A ; ~ I"~'~' ........ -~' .............. ' FEA.< I BI~.,TY >LAN ~ ~ , ) ........... NOT ~ E:KECUTIC ' i : i: ; : : , , ....... . ) i ......................... . i' ~,:,~-~-%~ ~ ~' : j I .. . :_,.~ _= _-:~ %~-,. .,. ~ ~ : .. ~ ~ ..... [ -~ ............... > ............ . . ' I : . ...... ~ ..... ~[ ............. I -.. [ . ; :,. ...... I - . .......... i ._ i ',000 !500 2.000 2500 3000 3500 4000 4500 5000 5500 6000 ' 8500 · i ~ .- I ii .... I I ... ill . il ~ . --T .... TOTRL '~. 06 WELL PERMIT CHECKLIST FIELD & POOL COMPANY INIT CLASS PROGRAM: exp [2] dev [] redrll [] servA UNIT# ./g~,~O ON/OFF SHORE ADMINISTRATION ENGINEERING GEOLOGY 1. Permit fee attached ................... Y 2. Lease number appropriate ................ Y 3. Unique well name and number ............... Y 4. Well located in a defined pool .............. Y 5. Well located proper distance from drlg unit boundary...Y 6. Well located proper distance from other wells ...... Y ' 7. Sufficient acreage available in drilling unit ...... Y 8. If deviated, is wellbore plat included ......... Y 9. Operator only affected party ............... Y 10. Operator has appropriate bond in force .......... Y 11. Permit can be issued without conservation order ..... Y 12. Permit can be issued without administrative approval...Y 13. Can permit be approved before 15-day wait ........ Y 14. Conductor string provided ............... ~Y~ N 15. Surface casing protects all known USDWs ........ ~y N 16. CMT vol adequate to circulate on conductor & surf csg.. N 17. CMT vol adequate to tie-in long string to surf csg . . . 18. CMT will cover all known productive horizons ...... Y~ N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............. N 21. If a re-drill, has a 10-403 for abndumnt been approved. .Y 22. Adequate wellbore separation proposed ......... ~ N 23. If diverter required, is it adequate .......... ~ N 24. Drilling fluid program schematic & equip list adequate -9 N 25. BOPEs adequate ..................... ~ N 26. BOPE press rating adequate; test to ~ psig.~ N 27. Choke manifold complies w/API RP-53 (May 84) ...... ~ N 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............ N 30. Permit can be issued w/o hydrogen sulfide measures .... Y N 31. Data presented on potential overpressure zones ..... Y~/ 32. Seismic analysis 9f shallow gas zones .......... 33. Seabed condition survey (if off-shore) ......... 34. Contact name/phone for weekly progress reports / Y N [exploratory only] ' ' ' GEOLOGY: ENGINEERING: COMMISSION: HOW/jo - A:~FORMS~cheklist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. 3 - 37/L - 35 ENDICOTT M CROFILMED Run 1' 17 - May- 1995 DIFUZDL/C;NIGR RECEIVED WESTERN ATLAS ^~"°~ Logging Services 11070 12571 ~£ape Subfile 2 'is type. ~IS TAPE HEADER ENDICOTT UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD RUN 1 6432.00 BRAD ESARY SCALES / BARKER 3-37 / L-35 500292255400 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 24 -MAY- 95 RUN 2 RUN 3 8 liN 17E 2773 670 56.00 0.00 15.15 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 10.750 5100.0 PRODUCTION STRING 9.875 12600.0 REMARKS: DIFL/ZDL/CN/GR. CIRCULATION STOPPED @ 06:00, 17-MAY-95. BARITES 44-45 PPB, CHLORIDES 350-400 MG/L. TOOLS CAME OUT OF HOLE COVERED WITH 4" OF FORMATION MATERIAL & HEAVY MUD. CALIPER VERIFICATIONS PERFORMED IN CASING. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER CORRECTED, CHISM ACTIVE, CASING CORRECTIONS OFF, SALINITY = 0.0 PPM. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR DIL SDN 2435 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) depth shifted and clipped curves; .5000 START DEPTH STOP DEPTH 11070.0 12511.0 11070.0 12571.0 11070.0 12535.0 11070.0 12516.0 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH LL8 ILD 11094.5 11095.5 11095.5 11095.0 11100.0 11134.0 11174.5 11183.5 11183.0 11185.0 11187.0 11187.5 11200.5 11200.5 11201.0 11212.5 11224.0 11225.5 11228.5 11231.0 11234.5 11243.5 11244.0 11244.5 11244.5 11247.0 11251.0 11253.5 11260.5 11264.0 11264.0 11264.0 11264.5 11270.0 11270.5 11270.5 11271.0 11278.5 11279.5 11279.5 11304.0 11316.0 11316.5 11316.5 11316.5 11369.5 11382.5 11382.0 all runs merged; 11383.0 11383.0 11383.5 11384.5 11384.5 11392.0 11392.5 11392.5 11392.5 11416.5 11417.0 11417.5 11417.5 11429.0 11428.5 11428.5 NPHI RHOB 11099.0 11133.5 11096.0 11133.5 11174.5 11185.0 11185.0 11229.0 11200.5 11212.0 11224.0 11226.0 11229.0 11232.0 11235.0 11247.5 11251.0 11260.5 11264.0 11279.0 11316.0 11370.0 11382.5 11247.5 11251.0 11254.0 11260.5 11264.0 11271.5 11278.5 11303.5 11316.0 11370.0 11392.0 11416.5 11429.0 11384.5 11393.5 11416.5 11429.0 no case 11441.5 11451.0 11458.5 11523.5 11564.0 11576.0 11587.0 11595.0 11596.5 11605.0 11613.0 11617.0 11641.0 11645.0 11651.0 11665.0 11675.0 11682.5 11683.5 11685.5 11712.5 11719.0 11727.0 11735.5 11739.5 11740.0 11751.5 11784.0 11794.5 11816.0 11820.0 11842.5 11849.5 11881.0 11883.0 11893.0 11924.0 11932.0 11965.0 12010.0 12016.0 12028.0 12031.0 12036.5 12049.5 12056.0 12064.5 12068.5 12069.5 12071.5 12073.5 12074.0 12076.5 12079.5 12081.5 12082.0 12088.0 12096.0 12096.5 12099.5 11564.0 11596.0 11645.5 11665.5 11739.5 11881.0 12030.5 12055.0 12063.5 12067.5 12079.5 12082.0 12096.0 11564.0 11596.0 11645.5 11665.5 11685.5 11727.5 11735.5 11881.0 12009.5 12030.5 12036.5 12055.0 12064.5 12067.5 12080.0 12082.0 12088.5 12096.0 12099.5 11441.5 11524.0 11564.0 11576.0 11587.0 11595.0 11605.0 11612.0 11641.0 11645.5 11651.5 11665.0 11674.5 11684.0 11713.5 11739.5 11881.5 11924.5 12016.0 12028.5 12031.5 12055.5 12072.0 12073.5 12076.5 12079.0 12082.0 12097.0 _1441.5 11451.0 11458.0 11523.5 11564.0 11576.0 11596.0 11605.0 11617.0 11641.0 11645.5 11651.5 11665.0 11682.0 11685.5 11713.5 11719.5 11739.5 11751.0 11783.5 11794.5 11815.5 11819.5 11842.0 11849.0 11881.5 11883.5 11894.0 11924.5 11932.5 11966.0 12016.0 12028.5 12030.5 12049.5 12055.5 12063.5 12069.0 12073.0 12079.0 12095.5 12132.5 12162.5 12163.5 12178.0 12191.0 12202.0 12219.0 12227.0 12244.0 12246.0 12247.0 12259.0 12264.0 12267.5 12273.0 12275.0 12280.5 12281.0 12288.0 12301.5 12305.5 12339.0 12389.0 12401.0 12410.0 12415.5 12418.0 12422.5 12423.0 12426.5 12429.0 12435.0 12438.0 12446.5 12453.5 12458.5 12462.5 12463.5 12468.0 12470.5 12476.0 12481.5 12483.0 12494.5 12496.0 '12496.5 12530.5 12550.5 $ MERGED DATA SOURCE PBU TOOL CODE GR DIL SDN 2435 $ REMARKS: 12132.5 12163.0 12163.5 12178.5 12178.5 12178.5 12177.5 12191.0 12191.0 12190.5 12202.5 12203.0 12202.0 12202.0 12219.0 12219.0 12227.5 12227.5 12227.5 12227.0 12244.5 12246.5 12247.0 12259.0 12258.5 12264.0 12268.0 12268.0 12267.5 12273.5 12273.5 12273.5 12273.5 12275.0 12275.0 12275.0 12275.0 12279.5 12279.5 12280.5 12280.5 12287.5 12287.5 12301.5 12301.5 12302.0 12301.0 12305.0 12304.5 12339.0 12339.0 12338.5 12389.0 12389.0 12389.0 12402.0 12402.0 12411.5 12411.5 12417.0 12417.0 12420.0 12420.0 12423.5 12423.5 12423.5 12427.0 12427.0 12429.0 12429.0 12435.0 12434.0 12437.0 12446.0 12446.0 12453.5 12453.5 12453.5 12453.5 12459.0 12463.5 12463.5 12463.5 12468.5 12469.5 12469.5 12475.0 12481.5 12481.5 12481.0 12482.0 12494.0 12494.0 12496.0 12497.0 12497.0 12497.0 RUN NO. 1 1 1 1 TEND, MAIN PASS. MTEM, SP, 12530.5 12550.5 PASS NO. MERGE TOP MERGE BASE 3 11070.0 12511.0 3 11070.0 12571.0 3 11070.0 12535.0 3 11070.0 12516.0 & TENS WERE SHIFTED WITH LL8. ILM, RT, DI WERE SHIFTED WITH ILD. FUCT & NUCT WERE SHIFTED WITH NPHI. DRHO, PEF, & CALl WERE SHIFTED WITH RHOB. CN WN FN COUN STAT / ??MATCH1. OUT / ??MATCH2. OUT /??MATCH3.OUT /??MATCH4.OUT $ : BP EXPLORATION (ALASKA) : 3-37/L-35 : ENDICOTT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 17 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR DIL 68 1 GAPI 4 2 LL8 DIL 68 1 OHMM 4 3 ILM DIL 68 1 OHMM 4 4 ILD DIL 68 1 OHMM 4 5 RT DIL 68 1 OHMM 4 6 DI DIL 68 1 IN 4 7 MTEM DIL 68 1 DEGF 4 8 SP DIL 68 1 MV 4 9 TEND DIL 68 1 LB 4 10 TENS DIL 68 1 LB 4 11 RHOB SDN 68 1 G/C3 4 12 DRHO SDN 68 1 G/C3 4 13 PEF SDN 68 1 BN/E 4 14 CALl SDN 68 1 IN 4 15 NPHI 2435 68 1 PU-S 4 16 FUCT 2435 68 1 CPS 4 17 NUCT 2435 68 1 CPS 4 4 08 310 01 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 43 995 99 1 4 43 995 99 1 4 43 995 99 1 68 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 222 Tape File Start Depth = 12619.000000 Tape File End Depth = 11067.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55891 datums Tape Subfile: 2 469 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Composite of all curves and log header data from all tool strings for a single run; Run #1 presented first followed by separate files for any other subsequent runs. RUN NUMBER: 1 1 3 .2500 VENDOR TOOL CODE START DEPTH GR 11070.0 DIFL 11070.0 ZDL 11070.0 2435 11070.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 12549.0 12588.0 12572.0 12551.0 17-MAY-95 FSYS REV. J001 VER. 1.1 600 17-MAY-95 1532 17-MAY-95 12600.0 12574.0 11070.0 12571.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL GR CN ZDL KNJT TEMP PCM KNJT DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR KNUCKLE JOINT DUAL INDUCTION TOOL NUMBER 3974XA 3967XA 3517NA 1309XA 2435XA 2222EA/2222MA 3921NA 2806XA 3506XA 3921NA 1503XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 9.875 5100.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): LSND 10.20 55.0 10.1 4.8 185.0 RESISTIVITY (OH~ AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 3-37/L-35 : ENDICOTT : NORTH SLOPE : ALASKA .520 .210 .830 .000 .860 .000 THERMAL SANDSTONE .00 .000 1.5 70.0 185.0 70.0 .0 70.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 GR DIFL 68 1 GAPI RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHM~ RILD DIFL 68 1 OHMM VILD DIFL 68 1 MV RT DIFL 68 1 OHMH DI DIFL 68 1 IN SP DIFL 68 1 MV TEMP DIFL 68 1 DEGF CHT DIFL 68 1 LB TTEN DIFL 68 1 LB SPD DIFL 68 1 F/MN ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 07 310 01 1 4 07 220 06 1 4 07 120 44 1 4 07 120 46 1 4 07 995 46 1 4 07 120 46 1 4 07 120 44 1 4 07 010 01 1 4 07 660 99 1 4 07 635 99 1 4 07 635 99 1 4 07 636 99 1 4 46 350 01 1 4 46 356 99 1 4 46 358 01 1 4 46 280 99 1 4 43 995 99 1 4 43 995 99 1 4 43 890 01 1 4 43 334 31 1 4 43 334 30 1 84 * DATA RECORD (TYPE# 0) Total Data Records: 565 974 BYTES * Tape File Start Depth = 12619.000000 Tape File End Depth = 11067.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 136599 datums Tape Subfile: 3 646 records... Minimum record length: Maximum record length: 62 bytes 974 bytes Tape Subfile 4 is type: LIS TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Composite of all curves and log header data from all tool strings for a single run; Multiple repeat passes for individual tool strings, if they exist, follow in a separate file. Run #1 presented first followed by separate files for any other subsequent runs. RUN NUMBER: 1 1 2 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12287.0 12536.0 DIFL 12287.0 12579.0 ZDL 12287.0 12560.0 2435 12287.0 12538.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): 17-MAY-95 FSYS REV. J001 VER. 1.1 600 17-MAY-95 1424 17-MAY-95 12600.0 12574.0 11070.0 12571.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL GR CN ZDL KNJT TEMP PCM KNJT DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR KNUCKLE JOINT DUAL INDUCTION TOOL NUMBER 3974XA 3967XA 3517NA 1309XA 2435XA 2222EA/2222MA 3921NA 2806XA 3506XA 3921NA 1503XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 9.875 5100.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): LSND 10.20 55.0 10.1 4.8 MAXIMUM RECORDED ~MPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 3-37/L-35 : ENDICOTT : NORTH SLOPE : ALASKA .520 .210 .830 .000 .860 .000 THERMAL SANDSTONE .00 .000 1.5 70.0 185.0 70.0 .0 70.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 GR DIFL 68 1 GAPI RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM VILD DIFL 68 1 MV RT DIFL 68 1 OHMM DI DIFL 68 1 IN SP DIFL 68 1 MV TEMP DIFL 68 1 DEGF CHT DIFL 68 1 LB TTEN DIFL 68 1 LB SPD DIFL 68 1 F/MN ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS 4 4 07 310 01 1 4 4 07 220 06 1 4 4 07 120 44 1 4 4 07 120 46 1 4 4 07 995 46 1 4 4 07 120 46 1 4 4 07 120 44 1 4 4 07 010 01 1 4 4 07 660 99 1 4 4 07 635 99 1 4 4 07 635 99 1 4 4 07 636 99 1 4 4 46 350 01 1 4 4 46 356 99 1 4 4 46 358 01 1 4 4 46 280 99 1 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 890 01 1 4 4 43 334 31 1 4 4 43 334 30 1 * DATA RECORD (TYPE# 0) Total Data Records: 117 974 BYTES * Tape File Start Depth = 12607.000000 Tape File End Depth = 12286.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 84162 datums Tape Subfile: 4 199 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 5 is type: LIS 95/ 5/24 01 **** REEL TRAILER **** 95/ 5/25 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 25 MAY 95 9:54a Elapsed execution time = 13.84 seconds. SYSTEM RETURN CODE = 0