Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
213-061
Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Z3 - 0 L I_ Well History File Identifier Organizing(done) Vrwo-sided III IIIIIIIIIII IIIII ❑ Rescan Needed III 111111IIII fIIII RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: Greyscale Items: ❑ Other, No/Type: Other Items Scannable by a Large Scanner Loss ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: 3/10/11/, /s/ Oil p Project Proofing 1 111111111111 IIIII BY: Date: 3//Op 1.1 /s/ 11/ P Scanning Preparation L-- x 30 =_ _0_ + = TOTAL PAGES ia7 I (Count does not include cover sheet BY: CMariaJ Date: 3 /,p Is! rilr Production Scanning 11111111 IIIH 11111 Stage 1 Page Count from Scanned File: I t� 0 (Count does include cov heet) Page Count Matches Number in Scanning Preparation: YES NO BY: Date: 3//0/ it-f' is, ror Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 111111111111 II IIIII ReScanned 1 11111111111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked III 111111 Ill IIII III 12/22/2011 Well History File Cover Page.doc o M o x O O .- ,- N N 8 I x a N O O > a) w O LL 0 u_ N Z a (6 m CO NI' a O a m (n (n G 5 > o g ° 2I I- I O° c c o o m D - m o I I g o a l 2 2 I I I I i it. a a p .o Ill a Og 0 C a c c c c a a 0- Oct a y ai y url ,I NI NI `nI cnI In L7 ai ai NI col w` O I d 8 2 2 2 2 Q Q E I E a) , a) Y. V) N I c 0) c Z Z a'I �I �I mI J J c co c> J Z a) a) a) 2 0 N N 0 0 a) E N O O a) Q c co 1.2E i—I ii NI oo�I oo.0 oo u ao.c 06.c oo a) IL EI u-U)I 00�I g - >. -Z oZ 0 > 0 > 0 > o > o o Z oz .-z any app ap ao mw mw mw a a Ww v a J o o cn c '— Oco Ow Ocn Ow Oco O O w2 coQ p0 I c ° c m° m> N> aiz 2z 2z 2zl yzl �O �> 25 o 0 °°I °°I ii°I it O ii O ii O ii O it i. ° I ° I ii I cn a 0 v_ 0 ,ow .9( u� .o E) Ov .O c.>° O° u° U E 'c5 'c5 'c� c LL c c w e c o c 'c 'E� 'c� Z m O O JI O JI O JI O>I° o>I o>I° O>I O•O o O J o f O J o U v v v v a v v a v v a) v v I v I v I V i oE O J y J y J y J V y J o f V' a)J a) o) a) a)m N m N m E Wo WO Wo WOM too woo Wo W'u) W Wa Wa Wa 0 c Z C 0 _M M_ M _.• M_ M_ M CO_ M_ M_ M_ M_ 0 m e- y > O o O O O O o O O O O O W :° N N N N N N N N N N N N N w u LO LO cn c[') cn cn co an U7 co a. re (6 ti W U W J � o0 ° j Z w G c a con Q L° 0 CO CO" 0 cO c`no � a c z p I m CL Z M C oo M M LO LO O 5-s-1 i a)o. U O U ' co M c o — J Z co o to Q cl r a J I. O p a) S c M J p�2 G • N CD m m N o n J N o M S • a) c ra Z g (7 Z n OI QQ O E Z Z d U 0 E J a Z a I O _ 2 07 CO @ CO CO 00 CO 06 CO CO (0 00 (1) y (0 76 f (6 f6 76 l0 W f6 f6 f0 l0 cn C E ° ° ° ° ° ° ° ° 00 ° ° r^i i Z Z To m m m m m m m m m m m O) m_ m m O_) O) or O O) O) O) O l y O ° ° ° ° ° In ° in ° ° ° ° o ° z J O j ` dm N++ H N N N 0 N N N N N N N o m u .5 E o 0 0 0 0 0 0 0 0 0 0 0 Q I Z - .2 N N N N CO N M 2 O W 0 Z N N N N N N N N N N N N N j as O Y i o € E E. •a. i z 2 " .2 aa` • — 1 Z o) G i U S \U ICJ \U `U \U 10 KJ U 10 W O C E 5 Q a J m ° a F a y of•w a ° ° ° ° ° ° ° ° 00 ° ° a. 3 a 1 1 w w w w w w w w w O M C in co co /� © et 01 0l gC.:1 c N 0 co LL M U- 1, ��( .moo co Z Lo ❑ co ❑ c c C7 } } } c N Q Q o> 0 �I p °1 p IL LL O in V N• 5 ❑ ❑ Q Q a u) T o M I �I �I �1 Q Q f` N N c c c c _ _ o c N N in In m CO th y O Q Cx. Z mI .=�1 2I 2I Q a d r r o F. J�Q' JQ' JQ' JQ' J J O 0 Q c` Q O al o yl o yl o yl o 9 a `) `) 20 jco 0 co u co 0 co 0 co co D o o j ■O-- O•— O•— O•— O w O I 0 0 J I O O� P:5 (T) O� O0 00- 0 - y I y I N I Cl) I N F ad — 4 QO LLO E QO LL °' y u) N V U y E X ZO CK E ZQ.0 z m .E u) o>I o in>I0 o>I o w o w 0wp E U /� } I- 0 U) u.- Q v Q v 0 Z 0 Z MQ o Ce v W036 Wm 9mo ?gym ) c ) = w c) wQLn W wain wQ W wcn c:,= f6 C7 y ❑ ii Z 0 M co M M M () Ga+ ., . co CL U l0 0 0 0 0 o Ey E p W (N N N N N N �p 0 ❑ w in n n n n U) co Z ui ci p n r� E n - o 0 W O y U W o j co o E 3 co Z t r N :? u) i Q y O J O. c ay 0 -0 E w CO o c v () y C r. o o y C N y O a a E 4 M U 0 V 1 c w y O J } } E N OD Q •� U a, ✓ o. E o $co co LL co c Z' 1 CI TA /� O Cs/ .y. y E W ❑ n c • T 7 I I- CO - a) y Cl) w - R v/ F- p Cl) c o p Q Y_ c m o az To 3 I Z y c - a o c Q Z a y O 0 £ U c b 2 ❑ z co CO CO w CO N M CO y • in ❑ ❑ ❑ ❑ ❑ ❑ as c Q N N f- N :3 To :C :C 74 = o Z 1 N cdi m 1 c o 0 0 0 0 0 LII m el cn el y = N •` M co CO p tY H cn m U CO a) c o ayi Q o o - Q o 0 U E V\ �'" O E v 0 E a H� O Q y (21 ❑ ❑ ❑ y - o 2 c> 0 o m p 2 w w w w w w -J 3 ? 0 Q 0 c) 0 W a _M O O O 6 N 9 V d, 0 O l ti M Z O N o) 0 O N o v N C W O z FL a D` J_ Z- m d ra N IX 0 O z i= U a UJ w cc a 0 w D U E D z 8 < J Q w O. • M o O N a m. E M Uo o 0 Q T- cti a H a a pp M O C a o G ° N CO W a /m� N rs Q Z O N Q O a Z o t CI E U m / z a> • Lo v N. M o m to v o m M 3 v d N N o I 0 RECEIVED STATE OF ALASKA SEP 0 9 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REP ORT AND L6iiGCC la.Well Status: Oil gi. Gas Ill Plugged❑ Abandoned ❑ Suspended ❑ lb.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 • Exploratory[1] 1 GINJ❑ WINJ❑ WDSPL❑ WAG Other No.of Completions: Service ❑ StratigraphicTest❑ 2.Operator Name: 5.Date Comp.,Susp.,or 12.Permit to Drill Number: ENI US Operating Co Inc Aband.: 7/2/2013' 213-061 • 3.Address: 6.Date Spudded: 13.API Number: 3800 Centerpoint Drive Suite 300,Anchorage 99503 6/14/2013 • 50-029-23424-60-00 4a.Location of Well(Govemmental Section): 7.Date TD Reached: 14.Well Name and Number: Surface: 3197 FSL 1576 FEL S5 T13N R9E UM 6/23/2013 • OP08-04 L1 • Top of Productive Horizon: 8.KB(ft above MSL): 53.2 15.Field/Pool(s): 78 FSL 1660 FEL 32 T14N R9EUM Ground(ft MSL): 12 Nikaitchuq/-Sc t Jtmikr 3/wit-O / Total Depth: 9.Plug Back Depth(MD+TVD): 2248 FSL 1581 FEL 32 T14N R9EUM 11,338 MD/3743 TVD • 4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16.Property Designation: Surface: x- 516703.74 y- 6036550.67 Zone- 4 11,344 MD/3745 TVD • 0373301,0355024,0390616 TPI: x- 516593.3448 y- 6038710.56 Zone- 4 • 11.SSSV Depth(MD+TVD): 17.Land Use Permit: Total Depth: x- 516676.38 y- 6040881.1 Zone- 4 none ADL 417493 18.Directional Survey: Yes U No H 19.Water Depth,if Offshore: 20.Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) (ft MSL) 1874' 21.Logs Obtained(List all logs here and submit electronic and printed information per 20 AAC 25.071): GR/RES/Neu/Den 22. CASING,LINER AND CEMENTING RECORD WT.PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 20" 178.89 X-65 SURFACE 154 SURFACE 154 30 Cement to Surface 13-3/8" 68 L-80 SURFACE 2334 SURFACE 2151 16 352 bbls 10.7#ASL,72 bbls 12#Crete • 9-5/8" 47 L-80 SURFACE 4999 SURFACE 3629 12.25 103 bbls 12.5#Litecrete 5.5" 17 L-80 4814 11113 3616 3727 8.5 slotted liner Aofk, r f,or., _)v 5.5" 18 L-81 4149 11338 3440 3743 • slotted liner(1_,/) 23.Open to production or injection? Yes igi _ No Ell If Yes,list each 24. TUBING RECORD interval open(MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD) slotted liner 4.5 4417 ESP completion/no pkr ` 25. ACID,FRACTURE,CEMENT SQUEEZE,ETC. - 1 a DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED �` rsK 26. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): 2/10/2011 ESP Completion / Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: 7/16/2013 1/24/1900 Test Period ....1023 178 77.3 128/128 179 Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 200 0 24-Hour Rate 1023 178 77.3 18.71 27. CORE DATA Conventional Core(s)Acquired? Yes❑ No 0 , Sidewall Cores Acquired? Yes ❑ No 0 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. RBDMS SEP 12 2 a 28. GEOLOGIC MARKERS (List all formations and markers encountered): 29. FORMATION TESTS NAME MD TVD Well tested? H Yes U No If yes,list intervals and formations tested, briefly summarizing test results.Attach separate sheets to this form,if Top of the window 4351 3514 needed,and submit detailed test information per 20 AAC 25.071. Bottom of the window 4368 3520 OA sand top 4940 3626 Formation at total depth: OA sand 11344 3744 30. List of Attachments: Summary of Daily ops, Directional survey,welibore schematic 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Michele Cesari @ 907-865-3338 Printed Name: Ja ri ht Title: Drilling and Completion Engineering Manager Ili Signature: to Phone: Date: 9/5/2013 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole Item 1a: Classification of Service wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with prod Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional in Item 26: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other (explain). III Item 27: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. c, glryery�yQr pp11 a p e♦ o 000F10 m OE" N WS 04 Oml Mm mom,in .m,-1WV NM N N 7 mN 0 0�W Nm ar,p:iON v GGG ppppmm yy�1 1D' P� N t"lY �pA'�./t0 x Cf NA W S CD�yp� App p� � • v1 �1 sg N4R IZA[0); -3 -i. 8222' -FtM 'rfj O,AQN N qn mm 4' EE JN�1p 1p mm{M{pp RMRR m'tMORIMO --m M n m n1RmDmmn mmmnmm�m �m �mbn a NH mw m 1122mm EW2W m2E2 aU,EW ,,m 222E2 2 m� m m a a. ..ttt .m m m m tt O t Q Q tO t t 0:044 t tt tt .tt t t V m fm m Q g� ryry v� yL�. H!H EVi aHacE �i-F1 a 4 m 41^0 'R vl In viN vin44vi qKnn 0 0 0 0^ 0 0^0 0 0 0 t0`'A A ^n A� - n Am A & Cm4'04m14 4x!:, p Nb Oy0A0 404 m Nmq ONOpSW4 Nmmafz. m m 0104'4 4 yCOx000 00 01 -ry h W V4 o22oo4 gAV A O yQQy2 Fig E anN W ,-613.75 mmAss 4tA0AtA mmsmm .2i ^tp msmmm zsa wsmm . 220 ..... ..... .nnnn ..... ..... nnnn n 0.... ..... 0nn. m 08Z 6 N OO N 848.1.g? 8.488A. N 3om4 an$ N 0 V O '8;7”7-.8..g OOpG 'O t iOp N Nn MA:%i gnnni1.N Q ls O MObO E ' 0 W ' p i 'A 2 E RnAg ARM 2Eg23 AR oo ' e2A $ss°332. 38.00 822E8 EEEE EE 1 3EE3e EEsE E J f O V Nt7 OtAmml, 141!N 0444.o IDT.. mO 'A N0 N.- .-0 ANOOA NImV,1�1iA C 2G�Nf7 00N G17 n1') l7QO�O CCIYON �-pO� G�f7�O Ot�I�fIMN ..M.M 6 82,7V.7. 7.I0 0 1 G 0 C n m s a O O ,1 n N 0 0 4 ma m140 i w Y m O 0 4 4 O� ' .A C+r. zi:=N N N 4 mN N N O 0$0 0 C 00 N 4 r a s 4 ,W.4.';: L Y F1. H $ =Cpp aN NQ, PRf h ow'M N OWW 10 i0 v t E Cl'[ Ov.22,” m 1:400-1R O $4a”. O 0 -. 470 "U = HERE FR8E Pn A AMEE F:M R4i,i R m g ILO j_< a. -f n o N N W 0 P of mJ?C b > 1 OO;N; 0b W tl$ 0 A$044.,. Om O4. m94404 0 ?04 444a4 N 4v..0O1 W, 3 t0 S S N 1 0oO' 18 V 2$515 Min NEY p. Ag ErmlO F EW1C! dNn04N , A � N L . 2 u FC f=0• $ . g=Eo QQr§8ao F2 o 42 .-g n - '1$6 W m.- m, 0 o =c0m8 sC824 AmTSN SoR�11 RW:22 nt^o.a s 2"2 2 71442 '234° c t 00-6 "8i "FFE V �7o :IEEE o a mg s 888" 828 o MM mmm� o r 2 • E o. ou�'io a t l' 6t EE C 3 ty a 0��y y� pp q t1.tt1.p �fyy y10� U b�CC OCC G Wm 0 O LL C 1.f.% .. 8 (� W Mm O R. -44t y� 'MN ' W aNC tD 141MOq 010 ern<01Q 101.B S;S$ 1�,t�1N MYf o 7'1 V y0u O 8 U X l Yy. Y 4 F Y q; m 004'8 4'0.04 fT 00�- v.�t±�, 10 01{�04�0p y� Op 1p�tq�O`tQ��IN ppf 0�M nN0�120 m J6 0@i�g C�a0r� V RCfn 88Ohm FNNRM YfNn10 m1Dw^ bW0�a OMmm' ^amlmllm 3 O 0_>>mp�01 1.2 9 2 R y `y� y 1. >C }1.3{ Q1 O J u K Q C 0 m .o Q 2 @ • Z t i i p ? O1 H g ;C 0 I s 2 • m W>> .-02,-,-2.J2...,1-_,' pp N`p 10y1 y1�r1mCpmmryn Z W W �O,04421(01 a r 410' af�lOOm 42♦0(4 n v.NpnO N l7bF f$t ;A Q!(OAp1, A 4^a W(?(10V0('14 N m O'lV n �Q M1� W mn 0170 V W E Q E'i NNNNN R gN 4N NN1 i7 8(81 '� 4 3�.S4an m�mwsr n n 0204 s- J p {�1 pp p 0 p 04 0 pp yy yy1 pppp 1y0� epp Q lCli 24PR a:Ne9i0 C~isnn Pl ^A2tN 244 ^ ON4e4i V 242,2g O At70A 2242 LL N O N� � fW MAO VA 2R2 v . m W Mrv. Amn`m'� Na4f1 . 24141X fo444A -00QO. A2R2 ,Sl,.-'8.r n.'goM8 223,4 g°4r2n. a 2 �znr1 �' ogXn rvo�n0i ao�0i ui dniMMN 'noAP eMR1NtAReMl1N?1 ARAx4 lb°a'1P�+ P An AA A A o m e €<s m G C y W g n G y 282P. 44g2:7 R.WM[mV m NNp1 W 0m 0C 2 M9 n W Q�4:- m Om 6R A{f 4O 4 W a m $ M A it 0OOe-a '''''°''''''°'''V ::::'VCN 47044 74V N^ mag*A n ngpa GatiYY fv1aAs N l 3 a R J g N A M n• i C•,- Y_YOtO Cvobs� ,..50...4 ..... y vv C W 10 m g esaas; mt0 W 2t .7,4�mO1n A pp42e,:iN tfWp 2g“A Ompf lg�1pp�(1A Z'404'1 VO1a0A 1A0eTA N0asa 0'nNN :1ep08<V O *alga s4tOsg h i001AQ triA a NN n ".1 .4n r,-,g, Onllm_V C�`iQ'�v . E .. r ill<4aA mm Kf'y NNN N NN mgg Reel f'la'li'11+117 p to a K L C co W a> g.. nj Q O J= :L 0 i .c m i E ..c; 1,11 e o i 2 A f r . rr i 2 2�6 4,' E m � o 0 y a o Z O i J Y• r N1 N1 E1" E U MO O•H O O •1"P P W v N M A V i r 1 r s I g "F:6,2.1= m O' "'W A,M2.°2 M°N PJJ� A0 Mg T pp 00M iVO2H ' Eg pE0 ^ S<B � F $s7m Mpp 66 Ny 1W E A h h b N N h n N N b N N N N mN m N O O C 0 0 0 rC 0 0 0 O O r O O 0 0 0 0 0 00 0C 0 0 0 0 0 0 0 0 0 0 0 000 00 0 0 0 00 f.40000 D O D O O 0 0 0 0 0 0 0 0 0 Q M g r p �0 m ryry pmp ryfy pM a �fpp pp 4(�7 pp uf0� mm �1pp f� p� m L W N020f EON^f00 W 22,O S W W101QOIAfI 2A W EDT 7,822f; m0M0mN p8gP HI 2011"22 N20mA n,2T 0 .Q-N2AtA7 222OAiSi N fig CN V W A W r N01s 1780 s A mM saw ns2N r grigE t NECHIO avaggi iV sgg§R �sgmm s 3� gtemt t.tatzP m � 2. 2 2 22221 .m G NN222 A.VP. T NNNN�Npp Nr!1Np!! NUS p0..... NN NNN NNNNpN NNNN N YN�pN�N N�Np !!pNN mN NaN NNN NN�p{NpN mass NNN N pNNNNN NNNNN pN C W qt TA N rf0NF3 W b0A 0 G1'1M���}}Op�u0100f h.poll 82Q:18 Nf�f'pps{y N10 NEG E$Ep1.O YNf 2P.!AN N}P2 pp22 fOa ms fop W EDr.V n f^N0 Off00 Or�O.N- to f. A{O t 8Nn�4 pgi(o 71182 0 W!tr ♦i0 i0 NA 81;;Z:.'N1717N .A-N0000I E§s1 6. A V HN{r% Am W pN�oO 17�1M�1 ryA 4��f 0g Vn N0 Amt tAgR WWWmm64 OptRay LAP W A 882 pO VOOOO Vp S Y pp yQp Ef fxOA yA_ EyD�OIry�aN ppN BN V"" l"� P5g A.171+1 fyp7 pM VMp pgg Y7 fpps 2 8 8 1p 2 Mo fp7 n n $2882 M M M pN8 pM pM�pgy 0 A 0 0 0 f0 fo0 fOO 100 f0 f0 o 8 8 f0 E(g g O O g g O O 2 2 2 f0 f0 fD g f0 1D 100 f0 b i 100 m EO E t0 W g too f0 0 l00 lop 1p to0 tl f0((4V0 m0W ^ 100 10 f0 fqp0 tEEOpp W W 1D frry00 10 ♦� 4D EO mm y W fq0 V m qm{1p0 f1�7 y pp 4H�I 11pp {{�7 �1yy N 4 82222 1'0001717 N AQ�OWi� AA�MOI NO16 OIrn1W0A 17 d A r 0 N NHI fOm m m<AOCI ROIP,t YI IOf000 n ARNEN�fO m2Y 18�,M 0 O .6.4.46 M 4j f N N Of YI C a O N N O O O M 1V G r O O.-M .,N N N N M A 01 N N M M 1V N HIM N N r N•W K 822Rg N W t V m Y 8g 9W9 Q for 24y yfn0� a g2AO 22 22 ,TAA22 (8:1'21p22 f2f�gn 1n0OT f.O f0,yA,O 17 Ems.(Ep�DY 1� t m2,ns Ny4 OINO1p1 p� !� '41 7$41q 1:'41°I� rONN NNN N(D n Cl O1�a 191"?1/7 '911010'n OI SI NRA gq ON§k- �T 00. 1N�1 f7 V Di g N K N7221N N r 0N 00<1V P8 2T 0 28 4 b T V O W W 8 N 8 2M f d t1 T 2 0 0 0 Q f2 28222 pp 0 0 Y YY m O C O W ,:81.2A2 22;.2g O' p N n P y f P n pA Hp N N C ^ 80 2 C 2 C S C4 88 G p O H . R N NNN N n n MA A O !M n 8 2 O 222 4 m O N 1,2 822 2 N N 8 D O 2g0 2 2 22 2 2 P 0 2208 b a p (�p p p .p �p o 10 pI p yI fp 10 m �y s. N 0t"n N A{7000 {O�W ID W NOO rN P44.142 NHINNN NO 00! 2TAA 11., v82te N Q W O f')m O ANO 1 PrO N W,MIT v r fp HI 1p yI Ep �p V p 1V p�G� 8.11 12§I.EAp fg%A0i a AA ryN IEI:OOS 1pV�W tiv. �R yg 1I♦lei e-HIMO P84WPf 2 :=Ag p m 22:'=02 W Cp8'I p12O P co rTNC t'AE�ON ON1 mN Am OIOYINM AArm AOZ 11'10. TvN,N N1H22N N2N22 10WN22 f0f0In01n0m g40g Nn g N NN 4'� N N17�MIIM77 174747 f11N M0 Q Y Y f Tv z,7,8 pp pp Ep 0I pI p p�V 1. ♦ p� p p 4 =K ::: ::: itp17 ::: :::::::: :::: ::: ::: P O 010 ::: :::��00 m :::: 2 A f f<s C 1 Q N O N 02A .Ep . . G 2 gYif ^m mg N NNN N N N N N W 7 7 A 7 y 7M HM V O N N N. N 2 2 8N 8.28W VV00 2L A 0 1b b A .Y' cp 1(I {y m 17 4p p p �p fp p1 1p 1p W p tp uI 47 HI p j C tO IglViff fhfyy Yf 12AN1Wp,2:; sv IN�,N 1W72sn 1NII 4 W rs.g2 0fA fS 1104.2,m NNN1YpIif{00p1 010178 QO pYpl Q.ip0001 0(001 2, . Yt QA,7ig o0 fy r A0n O wi;NOV$ W, ~ NNO� n01 i7Q 0f A W_Mm0 MNO A� fG�-{pOr ^I�AAA {Wp m10D100 OANn^ HI^^hA !Ha n W^w^ A11f0.I^N^ b1N�0 A� tM7 EO+ Y N n N n in0 mn n N 0 N N b q 10 YnI f(t0 b N N,^N tM0 t; 17 f7 17 17 fA7 17 IMF IMF M [7 M M M M M M M M 17 M M M M f7 l7 M h M rl I7 f7 M M M N K f 7 01 N O N D O W M A N O N m V 2 v R n N A v pp++8 0 W W O W N r Q N pp 1 10 0 A mC P O 0 2+,NO7 S O Dm M M A N'o R 0m q b 0 21A 82 0PAO2222 g O__Ngg g`Y7 2 2g 2222'0 00000 '7- 00 00000 Osi W C M 1yAA AA AAN 77AAM 0 7710 AppAm 'HyXA W7AAA 7pAAA 2e28. 1nMCr A Amm n 7 21:'78g OH820 222 2 A N n nt H0 I N N O G 0 0 n N m222,22 V 0 0 0 PN YDY N8N W V 0p '9 W:7 eg:8,78 M M 0 T n H N n'ON 1- IRO M 26 667 7N )C7RA 7RRRH 0 7+ p PA 7Oy §oO NnN N N 11 OrA7 g.N7 '982,121 O NNa.N 1.2W;-!P orOA r A Y4 NA 10 ; A Ng Q N 2t2 210N0Q 'O0A0 2.Y Art 5“-;24.4 0N 11 2 a1 mma;: W nmee 0008W mWsm0 22282 82828 OO2 822 800 W 0 OC N!W m0 ON r0 638;2 A gN-y n 8288:2 r '98 WO 2 f0OV n pg1 7 A 20 mN r8 p NnN'n Ittln MIA Mil g031 Him; lM til PE14,A OKIN mP^ i2 N gl ;MI N N O 1a {N� tg z O 4' C u �AO A i p M p 8` D i {1Np:n-.[110 gEn. AE{apT0+ O m t.8 ?OOOm�iz 2§mas iiiEE m a. aeaa aeaav avaaa o 2 g' $Y AWE Na n P g a+ AQnf Nm2p m N w 0000 0 0 0 0 0 00000 Q Nm i 4 2 N NV l TNa�N I�!!mm h.nhn !N ! . C Nz Gpy �O �,VrO z E R E M M e, o C NQ N z gibe ggggg ieggg g n.tsg °+ mnaaA ryn8°g 8 o$cirori 66.-'4-4O mo .-o o mmmim i aaJJJJJ .2• 00 oaoo$o CVrva8i P.18i12 aalee,o 8 0 ..mmmmmJJ \c'. Ei!2aN ct Eg ggg. E 1 aaaaaaJ$4 n .'Y ii'YSS l NN N JJOgO m 4 000000 i vats �e^ a mo N m N a . L ;< v r g AO !,1 0 8 a VV0 m lagqP '' $ Z C�N�� 42anm 22248 m .>• i m " ti ota r,d mqa a P m,tp eam m N w;m 1 t /o d O_ N Y • 4 g g I el C of oci `�yi `n°ie,4e 4$ t° a A ""6"""id 7e�i$gg eu�q 4 Q O �m �m�mm mmm a5 m 6 c % GO m a a u a c r. 7 2 \ Y t3oPS4' 12:=1"nP AT848 r C cxQ$ QR§§ T t A , \ O N m a PO PI m . -m� im ., - m 0 S s d `>' O CO m Z += « c r o o a U Q $Cso-! C t�ione man a 8.1811EE8 gg h « m RCM 1 N N N N N N < r N u ,_ — t n .o u'0 Z T c ` z t 2 ,iz ii o p iin En c ,- D •O srnos ;;8.1:2.= $8n78 n o a `,R `A; c'Ti`�i; `8n ERNE* g " w m c l s �o a ref tr tV Fg ' 4I _ C. 8mYp c^vWbx. :P:PMPI N U golZ§§3$8'YO 95 iA WEE ES A A o 2 1m�yg �6� 41 h N Y Y Y N� 8z m U1 fff �� m 43 ii u ce �p �np 8 Q c®8a o�`eyyi� m E 0 C2YH�N Nmaaw me4,W".g A p gc§n§§EH LIP N 2828 Ig"sS 2"gg & I o 61.0ry8''w � yJ°°2 g < N Y Y Y ^ LL^J K N ;111u h n o g.t.11 0 0, gmsAssTpi Gra88 s g;= 0 0 0 0 O O ' m O 1 ., J 6 'o u oi o I W E t u o'i O ih ❑ d Q-~ L C QM a) J "'• ❑ ❑ U eV Q.N 0 d O / J Q.o c C 0 pp Q1 __� eh C a 0 J L eh ) ^N ❑ co el co ti) Oo I ''. E I - 7) N I � II piWN M 0: I w N � R � +6 � 2 w 0 C� CI vi m CD 1°' I o Wi U) I ., Z _C L M L Z •"_` ,` sr I ±- N CO II I I X Q co = X � � -. I co o D I O 1 z 2 0_ a) O _se I I _ m Y rn X U 2 co o co N Q a) J � _ I 2 O d > L t '� 0 L i "' CI U � w .� � N � � a) a) E N L o .0 U c O N N I rR ' ❑ N -0 wa C p Q V ❑ (n ❑ ❑ - 2O p w I • '; •NtiN f6 `i U CO U H O d V _ -e0i = M � cn � .o c 3 E oo co Q 4 U N co- Q M M U U C r eA Zo o m rn� pp 0 a ~ a) o co N N 0V as 2 ° 2 2 O L eh E ! '. ci O -' cc co p o O O (1)4 (.4. . 4d M 3 eh .4: U i ' 4, #\\ Y J Y c ' ma N � A Y i / CS)it ..I cc co Ci co U . - N = 2 C cV TD 7 ch M d d' J Y_ eei N Z Eni E&P Division 'Well Name:0 08-04L1 li CI* EN!Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq Date:6/14/2013 - Report#: 1 APIIUWI:50-029-23424-60-00 2" " page 1 of 1 Wellbore name: Sidetrack 1 Well Header ALASKA oncession N° I EON!PETROLEUM !ENI Share(%) 100.001 DIRECT OConfiguration type Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) !Target Depth(TVD...I Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 I 18,584.00 68.76 270.3 1.00 Daily Information End Depth(RKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 0.0 79.0 46.0 Mostly Cloudy,WC NNE @ 7 MPH 42" Daily summary operation 24h Summary CO WELL FLUID AND MILL WINDOW,FIT,DRILL 120'NEW HOLE Operation at 07.00 DRILL W/MILL @4450'MD 24h Forecast DRILL TO 4488'MD.POOH,PU DIR ASMBLY,DRILL AHEAD TO 5000'MD Lithology 'Shows MAASP Pressure(psi) Mud Weight(lb/gal) 9.20 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 02:00 2.00 2.00 DRILL E 1 P PU TOOLS F/PIPE SHED T/RIG FLOOR.RU 4 1/2"HANDELING EQUIP.MU WATERMELON MILL ASSY.SET OFF THE SIDE OF RIG FLOOR. 02:00 03:00 1.00 3.00 DRILL E 1 P PICK UP 12 JTS.OF 4 1/2"D.P.DRIFT 03:00 06:00 3.00 6.00 DRILL E 1 P PU BHA ASSY AS PER BAKER REP.SCRIBE&ORIENTATE WHIP STOCK AS PER SCHLUMBERGER REP. 06:00 08:00 2.00 8.00 DRILL E 1 P TIH OUT OF DERRICK W/3 STDS OF 6 1/8"D.C.&10 STDS OF 5"HWDP 08:00 09.00 1.00 9.00 DRILL E 1 P CIRCULATE AND CONDITION PULSE TEST MWD TOOLS 400-450 GPM @ 630 PSI,CHANGE OUT SCHLUMBERGER SENSOR LINE T/TRANSDUCER.CALIBRATE TRAVELING DEPTH F/BLOCKS&DRAW WORKS. 09:00 12:00 3.00 12.00 DRILL E 1 P TIH W/5"D.P.2 MIN.PER STD.T/4399'UP W.T.170K DN W.T.110K @ E.O.T. 56/orL 12:00 12:30 0.50 12.50 DRILL E 1 P SERVICE RIG GREASE DRAWWORKS.TAKE MEASUREMENTS ON TOPDRIVE/ROTARY TABLE FOR LINER RUNNING TOOL. p 5 12.30 13:30 1.00 13.50 DRILL E 1 P CONT RIH F/4399'T/4686'BRING ON PUMP. T/400GPM 610PSI.OREINT WHIPSTOCK PER BAKER/SLB REPS. '�)I11 13.30 14:30 1.00 14.50 DRILL E 1 P SET AND SHEAR WHIPSTOCK PER BAKER REP.168UP-WT 120DWN-WT.50K-DWN TO SHEAR.TAG LINER TOP @ V' 4793'T.O.W @ 4351' 14.30 16:00 1.50 16.00 DRILL E 1 P DISPLACE TO OIL BASE PJSM.DISPLACE 8.8PPG BRINE TO 9.2 PPG FAZE PRO OBM.400GPM 920PSI.376BBL5. CLEAN UP AND PREP SHAKERS TO MILL WINDOW. 16.00 '22:30 - 6.50 22.50 DRILL E 1 P MILLING WINDOW F/TOW-4351'T/BOW-4368'DRILL RAT HOLE T/4388'@420GPM 1000PSI 80RPM 4-10-TO 2- 10WOM 120SPM.COLLECTING METAL CUTTINGS BACK OFF SHAKERS.MILLING WINDOW AVG 4.5'PER HR. WASH IN/OUT THROUGH WINDOW WITHOUT ROTATION NO TIGHTSPOTS. 22.30 23:30 1.00 23.50 DRILL E 1 P CONDITION MUD FOR F.I.T.CBU 420GPM 1000PSI PUMP SWEEP AROUND.TILL MWT 9.2 IN/OUT.WORKING PIPE. 23.30 00:00 0.50 24.00 DRILL E 1 P PERFORM_F.I.T_T/600PSI.BLEEDS OFF T/475PSI.E.M.W=11.9PPG V� , -1. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.Ddg.Spur. 907-685-0710 Eni representative Dean Sherman Eni Petroleum Drilling Supv. 907-685-0710 Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Kelly Couby Nabors Alaska Drilling Tool Pusher Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftKB( Run Date Last Leakoff Test Depth(RKB) ND(ftKB) Fluid Type Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 j� Eni E&P Division wall Name:0P08-oau l ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq 2^n II Date:6/15/2013 - Report#: 2 APlllJwl 50-029-23424 -00 II II page 1 of 1 Wellbore name: Sidetrack 1 Well Header PermiUConcession N° Operator ENI Share(%) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) 'Target Depth(ND..]Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) I DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18,584.00 68.76 270.3 2.00 Daily Information End Depth(ftKB) End Depth(TVD)(f...Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 0.0 82.0 52.0 Mostly Cloudy,WC NW©16 MPH 52- Daily summary operation 24h Summary FINISH MILL/DRILL TO 4488'MD,POOH AND TEST BOPE. _ Operation at 07.00 LD STL DC AND HWDP 24h Forecast PU BHA#3 CONT.DRILL Lithology 'Shows MAASP Pressure(psi) Mud Weight(lb/gal) 9.20 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 01:00 1.00 1.00 DRILL E 14 P (FIT)BLEED OFF 475 PSI T/TRIP TANK,RECOVER 3/4 BBLS.RD CHART RECORDER 01:00 07:00 6.00 7.00 DRILL E 14 P CONT T/DRILL RAT HOLE F/4388'T/4488'PUMP 420 GPM @ 1000 PSI.RPM 80.ROT TO 3-4K,WOM 6-10K,UP W.T.150K DN W.T.120K PUMP ONE BTMS UP. 07:00 08:00 1.00 8.00 DRILL E 11 P DIRECTIONAL SURVEYS INCLINATION ONLY @ 4488'4458'4428'470 GPM @ 1080 PSI 08:00 12:00 4.00 12.00 DRILL E 4 P POOH T/4339'FLOW CHECK WELL,PULL SLOW THRU WINDOW NOTE:SMALL BOOBLE @ 4363'PULL ABOVE WINDOW PUMP DRY JOB,POOH W/5"DP,5"HWDP&6 1/8"D.C.@ E.O.T. 12:00 15:00 3.00 15.00 DRILL E 4 P LAY DOWN BHA UD MILLING ASSEMBLY.RIG SERV. 15:00 17:30 2.50 17.50 DRILL C 12 P FLUSH CHOKE/KILL HOSE&HCR VALVES.FLUSH BOP STACK OF CUTTINGS.M/U 5"TEST JT.PULL WEAR BUSHING.INSTALL TEST PLUG PER VETCO REP. 17:30 '00:00 6.50 24.00 DRILL C 12 P TEST BOPS/CHK MAN WITH 5"&4.5"TESTING EQUIP.250-3500PSI 5MIN PER TEST,RECORDED ON CHART.2500PSI-BAG.PER PROGRAM.BOPE TEST WITNESS WAIVED BY AOGCC REP JEFF JONES. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative -Ben Perry Eni Petroleum Sr.DrIg.Spur. 907-685-0710 Eni representative Dean Sherman Eni Petroleum Drilling Supv. 907-685-0710 Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satoh Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bemie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Kelly Cozzby Nabors Alaska Drilling Tool Pusher Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) IND(ftKB) Fluid Type 'Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 Eni E&P Division Name:0P08-54L1 ril* ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • APIIUWI:50-029-23424-60-00 2^n Date:6/16/2013 - Report#: 3 II II II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° Operator ENI Share)%) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) 'RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) 'Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) I DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18,584.00 68.76 270,3 3.00 Daily Information End Depth(RKB) End Depth(TVD)(f..,Depth Progress(ft) Drilling Hours(hr) Avg ROP(ftlhr) POB Temperature(°F) Weather Wind 4,868.0 3,621.8 381.00 4.50 84.7 84.0 32.0 Mostly Cloudy,WC ENE @ 8 MPH 26' Daily summary operation 24h Summary TEST BOP,DRILL T/4868'MD Operation at 07.00 POOH 24h Forecast R/T PU BHA#2 DRILL AHEAD Lithology Shows MAASP Pressure(psi) Mud Weight(lb/gal) 9.20 Time Log Start End Cum -- 5 Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. f" 00:00 01:00 1.00 1.00 DRILL C 12 P TEST BOPS_WI 4.112Z25U-3500 PSI 5MIN PER TEST,RECORDED ON CHART.2500PSI-BAG.PER PROGRAM.LD (�f' TEST TOOL EQUIP,4 112"DRAIN STACK&BLOW DN CHOKE MANIFOLD,KILL LINE,CHOKE LINE&POOR BOY. INSTALL WEAR BUSHING AS PER VETCO REP.BOPE TEST WITNESS WAIVED BY AOGCC REP JEFF JONES. 01:00 02:00 I 1.00 2.00 DRILL E 20 P L/D TEST TOOL EQUIP 4 1/2".DRAIN STACK AND BLOW DOWN CHOKE MANIFOLD,KILL LINE,CHOKE LINE AND POOR BOY.L/D TEST PLUG. 02:00 02.30 0.50 2.50 DRILL E 4 P TRIP IN HOLE W/6 1/8"D.C.&5"HWDP 0/0 DRK LD DRILL PIPE 30 SINGLES OF 5"HWDP.LD BHA TOTAL OF NINE 6 1/8"D.C.MONITOR WELL F/STAIC LOSSES.ZERO LOSSES 02:30 04.30 2,00 4.50 DRILL E 20 P RIG UP SCHLUMBERGER TRANSDUCER T/TOP DRIVE KELLY GOOSE NECK.INSTALL SENSOR WIRE&SECURE T/STAND PIPE. 04:30 05:00 0.50 5.00 DRILL E 12 P TEST STANDPIPE MANIFOLD&KELLY HOSE T/TOP DRIVE 4000 PSI 15 MIN.CHART SAME,BLOW ON TOP DRIVE. 05:00 08:00 3.00 8.00 DRILL E 4 P RIH W/6 1/8"DC&5"HWDP OUT OF DERRICK. 08:00 09:30 I 1.50 9.50 DRILL E 20 P L/D 30 SINGLES OF 5"HWDP.USE VACUUM TO CLEAN INSIDE OF PIPE. 09:30 11:00 I 1.50 11.00 DRILL E 20 P L/D BHA.TOTAL OF NINE 6 1/8"DC'S.MONITOR WELL F/STATIC LOSSES.ZERO LOSSES. 11 00 11:30 0.50 11.50 DRILL E 20 P CLEAN RIG FLOOR. 11:30 12:00 I 0.50 12.00 DRILL E 20 P P/U BHA MUD MOTOR AS PER SLB REP. 12.00 15:30 3.50 15,50 DRILL E 20 P PJSM.STAGE BHA TOOLS ON RIG FLOOR.P/U BHA#1 PER SLB REP AND PROGRAM. 15:30 16:30 1.00 16.50 DRILL E 20 I P PERFORM S.H.T.450 GPM 950 PSI.GOOD TEST.GREASE TOPDRIVE.CROWN.DRAWWORKS.ADD WEIGHT TO TONG WEIGHT BUCKET.FUNCTION TESTSLB DRILL LINK. 16:30 19:00 2.50 19.00 DRILL E 4 P RIH W/BHA#1 8.5"BIT F/279'TO 4,297'.PROPER DISPLACEMENT.ORIENT MOTOR HIGHSIDE.RIH THROUGH WINDOW 4,351'TO 4,368'.NO PUMPS.TOOK NO WT.WASH DOWN F/4,393'TO 4,488'BTM. 19:00 23.30 4.50 23.50 DRILL E 3 P ROTARY DRLG/SLIDING F/4,488'TO 4,868'.500 GPM.140 SPM.1,875 PSI ON,1,750 PSI OFF,40 RPM,3-5 TO ON 3 TO OFF.8-12 WOB,9.2 MWT.ADT 2.76 HRS,AST 2.01 HRS,UP WT 150,ON WI'115,ROT WT 115.BACKREAM 30' BEFORE EVERY CONNECTION. 23:30 00:00 0.50 24.00 DRILL E 7 P CIRCULATE AND CONDITION.CBU 400 GPM,80 RPM,4.5 TO,1228 PSI.WORKING PIPE. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.04g.Spur. 907-685-0710 Eni representative Dean Sherman Eni Petroleum Drilling Supv. 907-685-0710 Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materats Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Kelly Cozzby Nabors Alaska Drilling Tool Pusher Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(RKB) TVD(ftKB) Fluid Type Fluid Density(Iblgal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 Eni E&P Division I Well Name:0P08-04L1 f191* EN!Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • APIIUWI:50-029-23424-60-00 en0 Date:6/17/2013 - Report#: 4 II II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type ALASKA ENI PETROLEUM 100.00_DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 _ _ Rig Information Contractor Rig Name IRig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) 'Target Depth(ND...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) IDES(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18,584.00 68.76 270.3 4.00 Daily Information - End Depth(ftKB) End Depth(TVD)(f...Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 4,868.0 3,621.8 0.00 83.0 36.0 Partly Cloudy,WC E @ 12 MPH 28" Daily summary operation 24h Summary TRIP FOR EXCEED BHA#2. Operation at 07.00 MAD PASS TO BTM 24h Forecast DRILL AHEAD TO TD. Lithology Shows MAASP Pressure(psi) I Mud Weight(lb/gal) 9.20 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00.00 01:00 1.00 1.00 DRILL E 7 P CONTINUE TO CBU.PUMP 1250 PSI @ 400 GPM,ROT TQ 4.5,RECIPROCATE DP,UP WT 140-150K,DN WT 103K, FLOW CHECK WELL OK. 01:00 03:00 2.00 3.00 DRILL E 4 P POOH SLOW THRU TOP OF WINDOW @ 4,351'AND BELOW WINDOW @ 4,368'W/BHA.NOTE PULLED TIGHT W/. HWDP AND DRILLING ASSEMBLY.FLOW CHECK WELL OK.PUMP DRY JOB. 03:00 09:00 6.00 9.00 DRILL E 4 P POOH W/5"DP.STAND BACK HWDP AND NM FLEX DC. 09:00- 10:30 1.50 10.50 DRILL E 20 P LAY DOWN BHA AS PER SCHLUMBERGER REP. 10:30 12:00 1.50 12.00 DRILL E 20 P PU BHA#2. 12:00 15:30 3.50 15.50 DRILL E 20 P PJSM.P/U BHA#2 TO 299'PER SLB PROGRAM.LOAD NUKE SOURCES PER SLB REPS.PERFORM S.H.T.WITH 420 GPM 600 PSI 25 RPM.GOOD TEST. 15:30 21:30 6.00 21.50 DRILL E 4 P PJSM.P/U 120 JTS.4.5"NC-46 DP.RIH TO 4.095'. 21:30 23:30 2.00 23.50 DRILL E 20 P PJSM.CUT 38'DRILLING LINE.INSPECT/ADJUST BRAKES.SET CROWNSAVER.CALIBRATE BLOCKS. 23:30 00:00 0.50 24.00 DRILL E 4 P RIH FROM 4,095'TO 4,327'.ENCOUNTERED TIGHT SPOT.TOOK 20K P/U.ATTEMPTED TO RIH THROUGH TIGHT SPOT.TOOK 20K.P/U. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.DrIg.Spur. 907-685-0710 Eni representative Dean Sherman Eni Petroleum Dolling Supv. 907-685-0710 Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 • Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Kelly Cozzby Nabors Alaska Drilling •Tool Pusher Tool Push Kenny Sullivan Nabors Alaska Drilling .Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(RKB) IND(ftKB) Fluid Type Fluid Density(1b/gall IP Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4.351.01 3,514.55 OBM 9.20 603.0 12.50 2,282.7 D Eni E&P Division (Well Name:0P08-04L1 • ENI Petroleum Co.Inc. Daily Repo Well Code:27293 Field Name:Nikaitchuq • API/UWI:50-029-23424-60-00 2^ Date:6/18/2013 - Report#: 5 I"I page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° Operator ENI Share(V.) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(81) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date !Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) I DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18.584.00 68.76 270.3 5.00 Daily Information End Depth(ftKB) End Depth(TVD)(f...Depth Progress(ft) Drilling Hours(hr) 'Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 6,200.0 3.672.8 1.332.00 8.58 155.2 87.0 38.0 Partly Cloudy,WC E @ 15 MPH 30' Daily summary operation 24h Summary DRILL T/6200'MD Operation at 07.00 DRILL W/EXCEED @ 6500' 24h Forecast DRILL AHEAD TO TD. Lithology Shows MAASP Pressure(psi) I Mud Weight(lb/gal) 9.20 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00.00 03:30 ' 3.50 3.50 DRILL E 4 P RIH.TAG AT 4334'.4380'AND 4392'. WORK BHA THRU TOP OF WINDOW AT 4351',WASH DOWN WITH 200 GPM, 540 PSI.UP WT 120K,DN WT 103K 03.30 04:30 1.00 4.50 DRILL E 6 P REAM/WASH T/4730',550 GPM,1425 PSI,30 RPM AT 300 FPH. ROT WT 110K,ROT TQ 3K 04.30 10:00 5.50 10.00 DRILL E 3 P DRLG WOB 10-12K.530 GPM,1900 PSI.120 RPM. ROT WT 110K,ROT TO 3-5K.WT UP 140K,WT DN 98K. ECD 10.25 I 10:00 11:00 1.00 11.00 DRILL E 7 P CBU 3X.530 GPM,1900 PSI,120 RPM 11:00 12:00 1.00 12.00 DRILL E 10 P i FIT AT 5209',380 PSI.BLEED OFF T/260 PSI. EMW=10.6 PPG 12.00 12:30 0.50 12.50 DRILL E 7 P CBU/COND MUD MW 9.2 M. 500 GPM WORKING PIPE. 12:30 14:00 1.50 14.00 DRILL E 10 P R/U HEADPIN,VALVES,CIRC HOSE,FLUID PACK LINES. FIT AT 5209',375 PSI,BLEED OFF T/300 PSI IN 30 MIN. I EMVV=10.8 PPG. R/D TEST EQUIP. 14:00 00:00 10.00 24.00 DRILL E 3 P DRLG WOB 2-15K,503 GPM.1800 PSI,120 RPM. ROT WT 110K,ROT TQ 5-6K.WT UP 135K.WT DN 95K. MW 9.2, ECD 10.31 SPR AT 6008'MD/3668'TVD#1 25/35 SPM-130/185 PSI#2 25/35 SPM-135/190 PSI. ADT=8.58 HRS Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry i Eni Petroleum i Sr.Ddg.Spvr. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Kelly Cozzby Nabors Alaska Drilling Tool Pusher Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cris.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(Ib/gal) P Surf Applied(psi) Eq.Mud Weight(Ib/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 Ent E&P Division I Well Name:0P08-04L1 ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • APIIUWI:50-029-23424-60-00 2 I�n rr Date:6/19/2013 - Report#: 6 I� II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° 'Operator EM Share(%) Well Configuration type ALASKA IENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Nurse IRig Type NABORS ALASKA NABORS 245 E ILAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) I Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) IDFS(days) Sidetrack 1 DRILLING 6/14/2013 11.350.0 18.584.00 68.76 270.3 6.00 Daily Information End Depth(RKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 6.695.0 3,684.6 877,00_ 9.03 97.1 87.0 40.0 Clear,WC 32" _NE @ 15 Mph Daily summary operation 24h Summary OPENHOLE SIDETRACK 5818',DRILL T/6695'MD Operation at 07.00 DRILL W/EXCEED @ 7,060'MD. 24h Forecast DRILL AHEAD TO TD. Lithology 'Shows MAASP Pressure(psi) Mud Weight(lb/gal) 9.20 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00.00 '04:30 4.50 4.50 DRILL E 3 P DRILLED F/6200'T/6550',500 GPM,1745 PSI,120 RPM,4-5K TQ,8-10K WOB. P/U 120K,S/O 95K.MW 9.2 PPG,ECD 10.5. DRILLED OUT OF OA SAND. SPR AT6486'MD,3698'TVD#1 25/35 SPM-135/170 PSI,#2 25/35 SPM-100/190 PSI. 04:30 05:00 0.50 5.00 DRILL E 7 XPO4 CBU 05:00 08:30 ' 3.50' 8.50 DRILL E 6 XPO4 BACKREAM T/5818'AT 20 MIN/STD PER KMI REP TO PREVENT SWABBING. 500 GPM.1770 PSI,ROT WT 110K,4K TO 08:30 09:30 1.00 9.50 DRILL E 19 P DOWNLINK TOOL ORIENTATION FOR SIDETRACKING 09.30 12:00 2.50 12.00 DRILL F 3 P TIME DRILL SIDETRACK F/5818'T/5890'.489 GPM,1600 PSI,120 RPM,3-5K TO 2K WOB,PU WT 120K,SO WT 95K, MW 9.2 PPG,ECD 9.9 1200 0000 ' 12.00 24.00 DRILL E 3 P DRILL F/5890'T/6695'. 503 GPM,1800 PSI,120 RPM,5-6K TQ,2-15K WOB. PU WT 145K.SO WT 93,ROT WT 118K. MW 9.2 PPG.ECD 10.3 PPG.SPR AT 6582'MD,3676'TVD#1 25/35 SPM-170/215 PSI,#2 25/35 SPM-170/215 PSI. Daily Contacts Position _ Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry 'Eni Petroleum Sr.Ddg.Spvr. 907-685-0710 Eni representative .Craig Ruminer Eni Petroleum Dulling Supv. Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Dolling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(lb/gal) IP Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 Eni E&P Division Well Name:OP08-04Lt Pi* ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • Date:6/20/2013 - Report#: 7 API/UWI:50-029-23424 60-00 2" " page 1 of 1 Wellbore name. Sidetrack 1 Well Header Permit/Concession N° !Operator ENI Share(%) /Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(it) !Water Depth(ft) RKB-Base Flange(ft) I RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) !Target Depth(TVD..,Depth Dr.(MD)(ft) Drilling Hours(hr) 'Avg ROP(ft/hr) IDFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.01 18,584.00 68.76 270.3 7.00 Daily Information End Depth(RKB) End Depth(TVD)(f...Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) FOB Temperature(°F) Weather Wind 8.305.0 3,762.1 1.610.00 14.00 115.0 87.0 56.0 Mostly Cloudy,WC NW @ 11 MPH 50° Daily summary operation 24h Summary DRILL F/6695'MD T/8305'MD Operation at 07.00 DRILL W/EXCEED @ 8,550'MD. 24h Forecast DRILL AHEAD TO TD. Lithology 'Shows MAASP Pressure(psi) I Mud Weight(Ib/gal) 9.10 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 00.00 24.00 24.00 DRILL E 3 P DRILLED F/6695'T/8305'460 GPM,1700 PSI.40-120 RPM,5-6K TQ,8-10K WOB,PU 160K,SO 90K,ROT 118K. MW 9.2 PPG,ECD 10.4 SPR AT 8011'MD,3750'TVD#1 25/35 SPM-165/195 PSI #2 25/35 SPM-170/200 PSI BACKREAM PRIOR TO CONNECTIONS Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry 'Eni Petroleum Sr.DrIg.Spur. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Dolling Supv. Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satoh Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Mike Williams Nabors Alaska Dulling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(1b/gall P Surf Applied(psi) Eq.Mud Weight(Iblgal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2.282.7 Eni E&P Division ..} I Well Name:OP09-04L1 lit* ENI Petroleum Co.Inc. Daily Repo l Well Code:27293 Field Name: Nikaitchuq • API/UWI:50-029-23424-60-00 2^n Date:6/21/2013 - Report#: 8 II II(� page 1 of 1 Wellbore name: Sidetrack 1 Well Header PermiVConcession N° Operator ENI Share(%) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E I LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DES(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18,584.00 68.76 270.3 8.00 Daily Information End Depth(f1KB) End Depth(TVD)(f..,Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 9,832.0 3,738.0 1.527.00 16.01 95.4 86.0 49.0 Mostly Cloudy,WC NE @ 9 MPH __ 4T Daily summary operation 24h Summary DRILL F/8305'MD T/9832'MD Operation at 07.00 DRILL W/EXCEED @ 10.099'MD. 24h Forecast DRILL AHEAD TO TD. _ Lithology Shows MAASP Pressure(psi) I Mud Weight(lb/gal) 9.10 Time Log Start End Cum Time _ Time Dur(hr) Our(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 00:00 - 24.00- 24.00 DRILL E 3 P DRILLED F/8305'T/9832 489 GPM,1850 PSI,60-120 RPM,5-10.5K TO,8-10.5K WOB,PU 120K,SO 95K,ROT 120K. MW 9.2 PPG ECD 10.5 PPG. SPR AT 9546'MD,3754'TVD#1 20/30 SPM-155/200 PSI,#2 20/30 SPM-160/205 PSI. BACKREAM PRIOR TO CONNECTIONA. Daily Contacts Position _ Contact Name Company Title _ E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.Ddg.Spur. 907-685-0710 Eni representative Craig Rummer Eni Petroleum Drilling Supv. Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Gas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(Iblgal) Leak Off Pressure(psi) 4.351.0 3,514.55 OBM 9.20 603.0 12.50 2.282.7 Eni E&P Division [We it Name:0P00-04L1 ft* ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • Date:6/22/2013 - Report#: 9 API/UWI:50-029-23424 60-00 2 rr i g page 1 of 1 Welibore name: Sidetrack 1 Well Header Permit/Concession N° 'Operator EM Share(%( I Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) I Water Depth(ft) RKB-Base Flange(ft) I RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Welibore Job Phase Spud Date Target Depth(fiKB) [Target Depth(ND...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) IDES(days) Sidetrack 1 DRILLING 6/14/2013 11,350.01 18,584.00 68.76 270.3 9.00 Daily Information End Depth(RKB) End Depth(TVD)(f...Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 11,250.0 3,746.0 1.418.00 15.29 92.7 97.0 37.0 Partly Cloudy.WC NE @ 10 MPH 33` Daily summary operation 24h Summary DRILL F/9832'MD T/11250'MD Operation at 07.00 BACKREAM @ 11,190'MD 24h Forecast BROOH,RIH TO RETRIEVE WHIPSTOCK. Lithology Shows MAASP Pressure(psi) 'Mud Weight(lb/gal) 9.10 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 0000 '00-.00 . 24.00. 24.00 DRILL .E '3 P DRILLED F/9832'MD T/11250'MD 447 GPM,1850 PSI,80-120 RPM,8-10.5K TO,2-25K WOB,PU/R 188K.SO/R 118K, ROT 120K.MW 9.1+PPG ECD 10.7 SPR AT 11076'MD,3769'ND#1 20/30 SPM-185/240 PSI,#2 20/30 SPM- 185/240 PSI. BACKREAM PRIOR TO CONNECTIONS. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.Ddg.Spvr. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative 011ie Atwell Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Mike Williams Nabors Alaska Dolling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan I Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(fiKB) Bottom(ftKB) Run Date Last Leakoff Test Depth((MB) TVD(fiKB) Fluid Type Fluid Density(lb/gal) I P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4.351.0 3,514.55 OBM 9.201 603.0 12.50 2.282.7 ifookt Eni E&P Division 'Well Name:OP08-04L1 ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • API/UWI:50-029-23424-60-00 2^n Date:6/23/2013 - Report#: 10 If II II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° Operator I ENI Share(14) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) IRKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name I Rig Type NABORS ALASKA NABORS 245 E I LAND RIG Job Information Wellbore Job Phase Spud Date 'Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) I DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18,584.00 68.76 270.3 10.00 Daily Information End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 11,344.0 3,745.5 94.00 1.10 85.5 105.0 38.0 Fog,WC 31` NE @ 14 MPH Daily summary operation 24h Summary DRILL F/11250'MD T/11344'MD,BROOH T/2500'MD Operation at 07.00 L/D BHA#2 24h Forecast Finish TOH,L/D BHA#2,P/U BHA#3 HO,RIH,SWAP FLUID IN HOLE Lithology Shows MAASP Pressure(psi) Mud Weight(1b/gall 9.10 Time Log Start End Cum ' Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 01:30 1.50 1.50'DRILL E 3 P DRILLED F/11250'MD T/11344'MD 447 GPM,1880 PSI,120 RPM,8-10.5K TO.2-25K WOB,PU/R 188K,SO/R 118K. ROT 120K.MW 9.1+PPG ECD 10.7 SPR AT 11344'MD,3745'TVD#1 20/30 SPM-180/220 PSI,#2 20/30 SPM- 180/220 PSI. BACKREAM STAND,MWD SURVEY. 01:30 23:00 21.50' 23.00 DRILL E 6 P BACKREAM F/11344'MDT/2500'MD PER KVM PLAN. CIO 9200 STKS,500 GPM,2300 PSI,120 RPM,7-8K TQ.FLOW CHECK 10 MIN.B/R 2 STANDS AT 30 MIN/STD,500 GPM.B/R 10 STDS AT 10 MIN/STD.B/R AT 5 MIN/STD. TIGHT SPOTS AT 6590'AND 5957',REAMED TO CLEAN-UP. WASHED UP THRU WINDOW F/4600'T/4340',MAX OVERPULL 50K. 23:00 00:00 1.00' 24.00'DRILL 8 7 'P CBU 3X AT 2500'MD,RECIP PIPE 600 GPM,1550 PSI,120 RPM,1.7K TO HOLE DID NOT UNLOAD. SLUG PIPE,B/D TOPDRIVE,LINE-UP TO TRIP TANK. Daily Contacts Position _ Contact Name Company Title E-mail Office Mobile • Eni representative Ben Perry Eni Petroleum Sr.Ddg.Spvr. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative Bill Petty Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(1b/gall P Surf Applied(psi) Eq.Mud Weight(Iblgal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 f Eni E&P Division `Well Name:0P08-04L1 ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • API/UWI:50-029-23424-60-00 2^ Date:6/2412013 - Report#: 11 " II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° 'Operator I ENI Share(%) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) 'Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) 'Target Depth(TVD..f Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 I 18,584.00 68.76 270.3 11.00 Daily Information End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) 'Drilling Hours(hr) 'Avg ROP(ftlhr) I POB Temperature(°F) Weather Wind 11,344.0 3.745.5 0.001 109.0 34.0 Cloudy,WC 23" ENE @ 19 MPH Daily summary operation 24h Summary L/D BHA#2 RIH W/HOLE OPENER BHA#3,DISPLACE OPEN HOLE W/FAZE PRO S OLIDS-FREE OBM Operation at 07.00 POOH W/BHA#3,AT 10,534'MD 24h Forecast POOH W/BHA#3,P/U RIH W/BHA#4 TO DISPLACE CASING W/BRINE AND RETRIEVE WHIPSTOCK Lithology Shows MAASP Pressure(psi) Mud Weight(lb/gal) 9.10 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 02:00 2.00- 2.00 DRILL E 4 P TOH F/2500'T/296' 02:00 06:00 4.00 6.00 DRILL E 20 P L/D BHA#2,PJSM,REMOVE SCHL.NUC SOURCE,L/D FLOAT SUB,FLEX COLLARS,ADN,TELESCOPE,EXCEED, BIT 06:00 08:00 2.00' 8.00 DRILL E 20 P SERVICE TOPDRIVE AND REPAIR SAFETY WIRES,CLEAN AND CLEAR RIGFLOOR 08:00 09:00 1.00. 9.00 DRILL E 20 -P P/U BHA#3 HOLE OPENER AND BITSUB.• 09:00 18:00 9.00 18.00 DRILL E 4 P TIH 7/11344'. WORKED PIPE/REAMED TIGHT SPOT F/6565'T/6595'TO CLEAN UP.RIH TO BTM. 18:00 22.30 4.50 22.50'DRILL E 7 P CBU 3X,650 GPM,2700 PSI,120 RPM.7K TO.RECIP PIPE.PUMP 2 HI-VIS SWEEPS PER K&M REP TO CLEAN HOLE. V 22:30 00.00 1.50' 24.00 DRILL E 7 P DISPLACE 8 1/2"OH W/FAZE PRO SOLIDS-FREE OBM 9.1 PPG. 294 GPM,765 PSI.80 RPM,RECIP PIPE. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.Dig.Spur. -907-685-0710 Eni representative Craig Rummer Eni Petroleum Drilling Supv. Eni representative Bill Petty Eni Petroleum HSE Em representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Bernie Leas Eni Petroleum Rig Clerk 907-670-8601 907-575-9427 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) IND(ftKB) 'Fluid Type 'Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2.282.7 iiiiiiiii Eni E&P Division I Well Name:OP08-04L1 ENI Petroleum Co-Inc. Daily Repo 1..t Well Code:27293 Field Name:Nikaitchuq � APIIUWI:50-029-23424-60-00 2 II ^n Date:6/25/2013 - Report#: 12 II 'I page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° 'Operator ENI Share(%) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53,30 12.20 Rig Information Contractor Rig Name I Rig Type NABORS ALASKA NABORS 245 E I LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18,584.00 68.76 270.3 12.00 Daily Information End Depth(ftKB) -End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 11,344.0 3,745.5 0.00 112.0 32.0 Fog,WC 22' NE @ 5 MPH Daily summary operation 24h Summary TOH W/BHA#3,HOLE OPENER PER KAM REP,T/4100',DISPLACE CASING WITH BRINE,TOH,P/U BHA#4 WHIPSTOCK RETRIEVAL TOOLS Operation at 07.00 TIH W/BHA#4 WHIPSTOCK RETRIEVAL TOOLS AT 4,359'MD. 24h Forecast TIH W/BHA#4 WHIPSTOCK RETRIEVAL TOOLS Lithology Shows MAASP Pressure(psi) Mud Weight(1b/gall 9.10 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 15:00 15.00 15.00 DRILL E 4 P TOH PER KW REP-1 STD AT 60 MIN/STD,FLOW CHECK,PUMP SLUG,TOH 1 STD AT 30 MIN/STD,TOH T/4100' AT 14 MIN/STD,9.5 MIN/STD,6.5 MIN/STD,5 MIN/STD.NO TIGHT SPOTS,NO TROUBLE AT WINDOW,NO SWABBING. 15:00 16:00 1.00 16.00 DRILL E 7 P CBU 400 GPM,575 PSI.60 RPM SHAKERS CLEAN. 16.00 191/0 3.00 19.00 DRILL E 7 P DISPLACE 9 5/8"CASING W/8.8 PPG BRINE,294 GPM,300 PSI,60 RPM.RECIP PIPE. CLEANUP UNDER SHAKERS. PITS AND DITCHES. 19.00 22.30 3.50' 22.50 DRILL E 4 P TOH,L/D HOLEOPENER.BITSUB. 22.30 00.00 1.50 24.00 DRILL E 4 P P/U BHA#4,WHIPSTOCK RETRIEVAL TOOLS AND MWD. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.Ddg.Spur. - 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative Bill Petty Eni Petroleum HSE Eni representative Satoh Bowe Em Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Billington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Greg Parker Eni Petroleum Expediter 907-980-7545 • Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) TVD(ftKB) -Fluid Type Fluid Density(1b/gall P Surf Applied(psi) Eq.Mud Weight(Iblgal) Leak Off Pressure(psi) ' 4.351.0 3,514.55 OBM 9.20 503.0 12.50 2,282.7 Eni E&P Division (Well Name:OP08-04L1 EN!Petroleum Co.Inc. Daily Report Well Code:27293 Field Name: Nikaitchuq • APIIUWI:50-029-23424-60-00 2 II^r, Date:6/26/2013 - Report#: 13 I' II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° 'Operator I ENI Share NO Well Configuration type ALASKA IENI PETROLEUM 100,00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(It) 'Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(ND...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0_ 18.584.00 68.76 270.3 13.00 Daily Information End Depth(ftKB) End Depth(TVD)(1..I Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) I POB Temperature(°F) Weather Wind 11,345.0 0.00 108.0 54.0 Clear ESE @ 7 MPH Daily summary operation 24h Summary TIH BHA#4,HOOK AND PULL WHIPSTOCK.CONTROL LOSSES W/HI-VIS PILLS,POH.P/U AND R/U FRANKS FX-350 LINER RUNNING TOOLS. Operation at 07.00 711-1W/5.5"LINER 2dh Forecast R/U FOR LINER RUN.P/U RUN AND LAND LINER ON 5"DP. Lithology 'Shows MAASP Pressure(psi) Mud Weight(lb/gal) 8.80 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00.00 03:00 3.00 3.00 DRILL E 4 P TIH W/BHA#4 WHIPSTOCK RETRIEVAL TOOLS T/4360',TEST MWD AT 1000'.350 GPM,900 PSI 03.00 04.00 1.00 4.00 DRILL E 19 P KELLY UP,PU WT 127,SO WY 111. ORIENTED HOOK,HOOKED WHIPSTOCK AT 4351', PALLED 30K OVER-BLED JARS,LINED UP PUMPS TO PILL PIT. PULLED 205K TO RELEASE ANCHOR,PICKED UP 13'TO PULL SEALS F/PBR. 04.00 07:00 3.00 7,00 DRILL E 7 P MONITOR WELL FOR LOSSES. INITIAL 50 BBL/HR.PUMPED HI-VIS PILL,LOSSES SLOWED TO 40 BBL/HR, 1i2` PUMPED SECOND PILL,LOSSES LESS THAN 20 BBL/HR L',pS 07:00 09.00 2.00 9.00 DRILL E 4 P TOH 3 STDS,STARTED SWABBING CONTAMINATED OBM/BRINE-MONITOR WELL /v-f 09:00 16.30 7.50 16.50 DRILL E 4 P TOH,PUMP OUT 2 STDS,20 SPM HI-VIS CITRIC PILL,12 BBLS,SPOT REMAINING PILL,PUMP 20 BBL SLUG.TOH AT 10 FT/MIN T/3331'TO AVOID SWABBING,THEN 2 MIN/STD TO BHA. 16:30 20:30 4.00 20.50 DRILL E 4 P UD BHA,PJSM,UD WHIPSTOCK,HOOK,JARS,HWDP PER BAKER REP.RACKBACK 4 STDS 4.5"DP. CLEAN - rgiCiTiTtiRTINTIZ OPS. 20:30 00:00 3.50 24.00 DRILL G 1 P RIG UP TO RUN CASING,PJSM,P/U R/U FRANKS FX-350 LINER RUNNING TOOLS,PREP FLOOR TO RUN 5.5" LINER I Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Ben Perry Eni Petroleum Sr.Dig.Spur. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative Bill Petty Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Bitlington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Ken Bogner Eni Petroleum Materials Coordinate Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftKB) Run Date Last Leakoff Test Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(1b/gall I P Surf Applied(psi) Eq.Mud Weight(1b/gall Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 lP* Eni E&P Division Iweu Name:OPDB-04L1 ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name: Nikaitchuq • 2^n Date:6/27/2013 - Report#: 14 APIIUWI:50-029-23424-60-00 II II II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° !Operator ENI Share(%) Well Configuration type ALASKA IENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) 'Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD..]Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) IDFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 I 18,584.00 68.76 270.3 14.00 Daily Information End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) !Drilling Hours(hr) !Avg ROP(HMO POB Temperature(°F) Weather Wind 11,345.0 0.00 105.0 46.0 Mostly Cloudy N @ 6 MPH Daily summary operation 24h Summary R/U RUN 5.5"LINER,LOCATE SIDETRACK THRU WINDOW, Operation at 07.00 P/U M/U LINER HANGER&RIH on DP 24h Forecast P/U M/U LINER HANGER,RIH W/LINER ON 5"DP,SET LINER,TOH UD 5"DP Lithology Shows MAASP Pressure(psi) !Mud Weight(Ib/gal) 8.80 Time Log Start End Cum Time Time Dur(hr) Dar(hr) Phase Opr. Act. Plan Oper.Descr. 00.00 02'00 2.00 2.00'DRILL G 1 P RIG UP TO RUN CASING,P/U R/U FRANKS FX-350 LINER RUNNING TOOL,SLIPS,SAFETY VALVE. PREP FLOOR TO RUN 5.5"LINER.PJSM 02.00 13:30 11.50 13.50 DRILL 'G 4 P RUNNING LINER,P/U 5.5"HYDRIL LINER. MONITOR HOLE FOR LOSSES,LOST 10 BBL ON STD 10,13 BBL ON STD 20,7.5 ON STD 30. TAG TOL MOTHERHOLE AT 4810'. TOH L/D LINER T/4519'. 13.30 15:30 2.00 15.50 DRILL -G -25 TS03 TROUBLESHOOT/FIX FRANKS FX-350 RUNNING TOOL-REPLACE C-CLAMP PER FRANKS REPS. PERFORM RIG SERVICE. 15.30 22:30 7.00 22.50 DRILL -G 4 P RUNNING LINER,TOH L/D LINER T/4340', ROT WATCHING TQ,LOCK STRING,RUN LINER THRU WINDOW. TAG TOL MOTHERHOLE'. TOH UD LINER 114526.ORIENT 90 DEG,RUN LINER T/6726'. ROT TIGHT HOLE T/6825',25 RPM.4.6K TQ.RUN LINER T/71601 THREAD MAKEUP PER GBR REP. 22.30 00:00 1.50 24.00 DRILL -G '5 P RIG DN,PJSM.R/D SET-BACK FRANKS FX-350 LINER RUNNING TOOL. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.Dig.Spur. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative Bill Petty Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Billington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Ken Bogner Eni Petroleum Materials Coordinato Tool Push Mike Williams Nabors Alaska Dolling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Dolling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftKB) Run Date CASING 51/2 4.950 L80 4,149.5 11,340.0 6/28/2013 Last Leakoff Test Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(Ib/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 If* Eni E&P Division (Well Name:OP08-04L1 ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • APIIUWI:50-029-23424-60-00 2^n Date:6/28/2013 - Report#: 15 1111 II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° Operator ENI Share(14) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) 'Water Depth(ft) RKB-Base Flange(ft) I RKB-Tubing Spool(ft) 53.30 12.20 1 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245E LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD..1Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) IDFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18,584.00 68.76 270.3 15.00 Daily Information End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) 'Avg ROP(ft/hr) IPOB Temperature(°F) Weather 'Wmd 11,345.0 0.00 109.0 53.0 Clear SSW @ 7 MPH Daily summary operation 24h Summary RIH 5.5"LINER ON 5"DP,SET TOL 4149.52'.CIRC CASING CLEAN. TOH L/D 5"DP AND RUNNING TOOL. TIN UD 5"DP. MOVE FRANKS FX-350 TO ODS PIPE RACK. Operation at 07.00 L/D 4.5"DP. 24h Forecast RIH,UD 4.5:DP. R/U AND RUN 4 1/2"TUBING STRING Lithology (Shows MAASP Pressure(psi) I Mud Weight(Ib/gal) 8.80 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 03:00 3.00 3.00 DRILL G 5 P R/D FRANKS FX-350 LINER RUNNING TOOLS,ATTACH BALES AND ELEVATORS,REMOVE SLIPS. P/U M/U BAKER LINER HANGER,ADD GEL,WAIT 30 MIN. 03:00 06:30 3.50 6.50 DRILL G 4 P RIH LINER ON 5"DP.T/11315'. CIRC ON STD 1 TO ENSURE CIRC THRU HANGER. PU WT 145.SO WT 80, KELLY UP. ,ej'T 06:30 09:00 2.50 9.00 DRILL G 19 P`SHUT OFF TAG 11344',PU T/4149.52'TOL. DROP BALL,TEST LINES MP,PRESS UP 7/3000 PSI-SHEARED HYD SET TOOL OAT 2300 PSI.PRESS LUP T/3500 PSI THOLD P5 PSI, LING/1- MIN,SHEARED AT 3400 PSI. SLACK-OFF F/145K T/60K WT,PRESS UP T/3800 PSI TO SHEAR HRD. BLEED OFF. P/U TO RELEASE. CLOSE ANNULAR.P TEST/CHART 1500 PSI 15 MIN. 09.00 10:00 1.00 10.00 DRILL G 7 P TON 1 STD,UD 1 JT. PUMP HI-VIS CITRATE SWEEP TO CLEAN BRINE. 4900 STKS AT 60/90 SPM,150 PSI. PU WT ��' 125K. 10:00 17:00 7.00 17.00 DRILL G 4 P TOH L/D 5"DP.UD BAKER LINER RUNNING TOOL. 17:00 22:30 5.50 22.50 DRILL E 4 P CLEAN FLOOR,RIH W/36 STDS 5"DP.TOH LID 106 JTS DP. 22.30 00:00 1.50 24.00 DRILL E 5 P P/U 15'PUP 5"DP. M/U TO DBL,M/U TO FRANKS FX-350.MOVE TO ODS PIPE RACK. Daily Contacts Position Contact Name Company Title E-mail Office Mobile • Eni representative Ben Perry Eni Petroleum Sr.Ddg.Spvr. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Dulling Supv. Eni representative Bill Petty Eni Petroleum HSE Eni representative Satoh Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Billington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Ken Bogner Eni Petroleum Materials Coordinato Tool Push Mike Williams Nabors Alaska Dulling Tool Pusher 907-670-1492 Tool Push Kenny Sullivan Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date CASING 51/2 4.950 L80 4,149.5 11,340.0 6/28/2013 Last Leakoff Test Depth(RKB) 'TVD(ftKB) Fluid Type Fluid Density(lb/gal) IP Surf Applied(psi) Eq.Mud Weight(Ib/gal) 'Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.501 2,282.7 En/E&P Division 'Well Name:OP08-04L1 ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • APIIUWI:50-029-23424-60-00 2 01*II^n Date:6/29/2013 - Report#: 16 II 'I page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° !Operator ENI Share(%( Well Configuration type ALASKA IENI PETROLEUM 100,00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name I Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date 'Target Depth(ftKB) I Target Depth(ND...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) Sidetrack 1 DRILLING 6/14/2013 11,350.0 18,584.00 68.76 270.3 16.00 Daily Information End Depth(ftKB) End Depth(TVD)(f...Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 11,345.0 0.00 110.0 50.0 Clear/Fog 1E @ 10 MPH Daily summary operation 24h Summary TIH HWDP,JARS,AND 4.5"DP. TOH,L/D JTS. PULL WEAR RING. Operation at 07.00 COMPLETION PHASE 24h Forecast LAST DAILY DRILLING REPORT,RUN COMPLETION Lithology 'Shows MAASP Pressure(psi) Mud Weight(lb/gal) 8.80 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 08:30 8.50 8.50 DRILL E 4 P RIH 1 STD HWDP AND JAR,TOH,L/D. RIH 4.5"DP T13795',TOH.L/D 15 JTS,RIH REMAINING STDS. TOH,L/D ALL 4.5"DP. 08:30 09:00 0.50 9.00 DRILL E 5 P PULL WEAR RING FROM BOP. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum Sr.Ddg.Spvr. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Sup/. Eni representative Bill Petty Eni Petroleum HSE Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Killington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Ken Bogner Eni Petroleum Materials Coordinato Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push David Hanson Nabors Alaska Drilling Tour Pusher Last Casing seat Can.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date CASING 51/2 4.950 L80 4,149.5 11,340.0 6/28/2013 Last Leakoff Test Depth(ftKB) IND(ftKB) Fluid Type Fluid Density(lb/gal) IP Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 n Eni E&P Division (Well Name:OP08-04L1 EN/Petroleum Co.Inc. Daily Report Well Code:27293 Field Name: Nikadchuq , • APIIUWI:50-029-23424-65-00 2^ Date:6129/2013 - Report#: 1 II 'I page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° Operator IENI Share)%) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(H) RKB-Base Flange(ft) 'RKB-Tubing Spool(ft) 53.30 1220 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date 'Target Depth(ftKB) Target Depth(TVD..]Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) Sidetrack 1 COMPLETION I 0.00 Daily Information End Depth(HKB) End Depth(TVD)(f.. Depth Progress(ft) 'Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather 'Wind 0.0 110.0 50.0 Clear/Fog E @ 7 MPH Daily summary operation 24h Summary TOOH UD DP,RIH W/REMAINING DP IN DERRICK,TOOH L/D DP,PULL WEAR RING.CHANGE SPOOL ON CENTRILIFT UNIT,R/U COMPLETION EQUIP.R/U WIRELINE RUN PUMP IN TUBING,SET AND TEST TO 1,000 PSI HOLD 15 MIN.,PULL TEST TOOL,SET TUBING STOP,R/D WIRELINE,PULL PUMP OOH TTC LOWER FLANGE SNAG I DAMAGED FLANGE Operation at 07.00 R/D ESP 24h Forecast L/D ESP,R/U TO TEST BOPE,TEST BOPE,RUN COMPLETION Lithology I Shows MAASP Pressure(psi) 'Mud Weight(lb/gall- - Time Log 1 Start End Cum Time Time i Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 09:00 11:00 2.00 2.00 PREP K 1 P CHANGE OUT SPOOL ON CENTILIFT UNIT,R/U SHEAVES 11:00 12:00 ' 1.00 i 3.00 PREP K 1 P MAKEUP TOOLS,BHA P/U FRANKS TOOL ATTEMPT TO BREAK OUT DRILL PIPE 12:00 16:00 ' 4.00' 7.00 PREP K 1 P LD,MAKEUP TOOLS,BHA R/D DP OFF FX CSG TOOL,SET TOOL TO SIDE.L/D 3 JTS T/SHED,R/D ELEVATORS AND BAILS,M/U FX CSG TOOL T/TOP DRIVE,CON'T P/U 3RD PARTY TOOLS F/SHED,PREP FLOOR T/RUN 4.5 L-8PIIIITALIOJAPAIIUMP, LA/V\ 16:50 18.00 2.00° 9.00 PREP K 1 P RUN DOWNHOLE PUMPS,START M/U PUMP P/U SHROUD HANGER,XO,1 JT,TTC X OVER ECT...AS PER /J PROGRAM .5.-I 18.00 21:30 3.50 12.50 PREP R 1 P COMPLETION-SLICK LINE/WIRELINE WORK SPOT AND R/U WIRE LINE RUN PUMP EQ IN TBG SET AND TEST 1000 PSI 15 MIN,BLEED OFF,PULL TEST TOOL.SET TBG STOP, 21:30 22:30 ' 1.00 13.50 PREP R 1 P R/D WIRE LINE,PULL PUMP OOH SNAG IN STACK W/TTC XO DAMAGE 22.30 00:00 1.50 15.00 PREP R 1 P LINE/WIRELINE WORK RUN PUMP BACK IN HOLE R/U WIRE LINE,PULL TBG STOP AND PACKOFF Daily Contacts Position Contact Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum 'Sr.Ddg.Spvr. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative Ken Bogner Eni Petroleum Materials Coordinate Eni representative Satoh Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Billington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Bill Petty Eni Petroleum HSE I Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push David Hanson Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftKB) Run Date CASING 51/2 4.950 L80 4,149.5 11,340.0 6/28/2013 Last Leakoff Test Depth(RKB) TVD(ftKB) Fluid Type Fluid Density(lb/gal) I P Surf Applied(psi) Eq.Mud Weight(1b/gall Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 Eni E&P Division 'Well Name:OPSS-04L1 • ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name: Nikaitchuq � APIIUWI:50-029-23424-60-00 2^II Date:6/30/2013 - Report#: 2 �� II page 1 of 1 .Wellbore name: Sidetrack 1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name I Rig Type NABORS ALASKA NABORS 245 E I LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(ND...Depth Dr.(MD)(ft) -Drilling Hours(hr) Avg ROP(ft/hr) IDES(days) Sidetrack 1 COMPLETION 0.00 Daily Information End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind 0.0 90.0 46.0 Cloudy rind @ 13 MPH Daily summary operation 24h Summary L/D TUBING,MOTORS,PUMP ASSEMBLY. R/U AND TEST BOPS. P/U M/U PUMP ASSMB.,HALL W/L WORK-SET PUMPS,PACK-OFF,TEST TOOL,TEST,PULL TEST TOOL,SET TUBING STOP. P/U AND SERVICE MOTOR AND SEALS. P/U CHECK ROT. PLUG IN TEC LINE. Operation at 07.00 - - RIH 4.5"TUBING STRING. 24h Forecast RIH 4.5'TUBING STRING,POWER CABLE AND CAP TUBE. M/U HANGER.LAND,LOCK-DOWN,PRESS TEST U/L HANGER BODY SEALS. PULL LANDING JT.INSTALL BPV,N/D STACK,N/U TUBING ADAPTER AND TREE.PRESS TEST TREE AND HANGER. ELEC CHECK ESP. FREEZE-PROTECT ANN. SHUT IN WELL. RDMO DRILL RIG. Lithology Shows MAASP Pressure(psi) Mud Weight(1b/gall 8.80 Time Log Start End Cum Time Time Dur(hr( Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 03:30 3.50 3.50 COMP 'R 15 P HALL ATTEMPT TO W/L PACKOFF.PARTED LINE. 03:30 06:00 2.50 6.00 COMP 'K 4 P B/O L/D COMPLETION TOOLS.PUMP,SHROUD. R/D FRANKS FX-350 SET BACK. 06:00 07:00 1.00 7.00 COMP 'C 12 P P/U BOP TEST TOOLS,P/U 4.5"DP TEST JT,TIW,DART,PORTED SUB,TEST PLUG,FILL STACK/CHOKE MANIFOLD. 07:00 12:00 5.00 12.00 COMP 'C 12 P BOP TEST,WITNESS WANED BY JOHN CRISP.250 PSI LOW,3500 PSI HIGH. ANNULAR 2500 PSI HIGH AT 09:00. KOOMY TEST-MAN=1650 PSI,ANN=1480 PSI,3000 PSI START 1700 PSI AT BLEED-OFF.31 SEC.TO 200 PSI,144 SEC TO 3000 PSI.2115 PSI AVG FOR BOTTLES. 12:00 13:30 1.50 13.50 COMP 'C 12 P L/D TEST TOOLS,PULL TEST PLUG L/D. B/D CHOKE MANIFOLD,CHOKE/KILL LINES 13:30 14:00 0.50 14.00 COMP K 20 P M/U FRANKS FX-350 CSG TOOL. 14:00 17:00 3.00 17.00 COMP K 20 P M/U DH PUMP. CHANGE OUT TTC XO. P/U M/U PUMP ASSEMBLY PER CENTRILIFT REP/FROG 17:00 19:30 2.50 19.50 COMP 'R 15 P R/U WIRE LINE RUN PUMP ED IN TBG SET AND TEST 1000 PSI 15 MIN,BLEED OFF.PULL TEST TOOL.SET TBG STOP.R/D. 19:30 00:00 4.50 24.00 COMP K 15 P POH PUMP,CHECK ROT. P/U MOTOR AND SEALS.SERVICE. PLUG IN TEC LINE. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum 'Sr.Ddg.Spvr. 907-6B5-0710 Eni representative Craig Ruminer Eni Petroleum Dulling Supv. Eni representative Ken Bogner Eni Petroleum Materials Coordinate Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Billington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Bill Petty Eni Petroleum HSE Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push David Hanson Nabors Alaska Drilling Tour Pusher Last Casing seat J Can.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date CASING 51/2 4.950 L80 4.149.5 11,340.0 6/28/2013 Last Leakoff Test Depth(ftKB) I TVD(ftKB) Fluid Type Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.20 603.0 12.50 2,282.7 I Eni E&P Division I Well Name:0P08-04L1 ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • 2^ Date:7/1/2013 - Report#: 3 API/WN:50-029-23424 60-00 I' II page 1 of 1 Welibore name: Sidetrack 1 Well Header Permit/Concession N° Operator ENI Share(14) Well Configuration type ALASKA ENI PETROLEUM 10000 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name IRig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date 'Target Depth(ftKB) Target Depth(TVD...I Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) Sidetrack 1 COMPLETION 0.00 Daily Information End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) 'Drilling Hours(hr) Avg ROP(ft/hr) I POB Temperature(°F) Weather Wind 0.0 90.0 46.0 Overcast N @ 7 MPH Daily summary operation 24h Summary RUN PUMP,CENTRILIFT SPLICE ESP CABLE.RIH ON 4.5"TUBING T/3940'. TEST ESP/1000'AND INSTALL CANNON CLAMPS PER PROG. M/U VIT JTS,XO'S.LANDING JT,AND HANGER. INSTALL PENETRATOR THRU HANGER,SPLICE ESP TO FIELD CONNECTOR. Operation at 07.00 N/D STACK. 24h Forecast SET/LOCK-DOWN HANGER.TEST U/L HANGER SEALS. PULL LANDING JT,INSTALL BPV. N/D STACK. N/U TUBING ADAPTER AND TREE. PULL BPV,INSTALL TEST PLUG.TEST TREE AND HANGER. PULL TEST PLUG. ELEC CHECK ESP. SHUT IN WELL. RDMO. FREEZE-PROTECT LATER TODAY. Lithology Shows MAASP Pressure(psi) 'Mud Weight(lb/gal) 8.80 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase_ Opr. Act. Plan Oper.Descr. 00:00 01:30 1.50 1.50 COMP K 15 P RUN PUMP INSIDE SHROUD 01 30 05:30 4.00 5.50 COMP K 15 P RUN RUN INTO DISCHARGE SUB,SPLICE CAP LINE. P/U M/U JT 4.5"TUBING,CENTRILIFT SPLICE ONTO ESP CABLE 05.30 17:00 11.50 17.00 COMP K 4 P RIH ON 4.5"TUBING T/3940'. TEST ESP EA 1000',INSTALL CANNON CLAMPS PER PROG. 17:00 21:00 ' 4.00 21.00 COMP K 4 P P/U M/U VIT JTS,XO'S,LANDING JT,AND HANGER 21:00 00:00 3.00 24.00 COMP •K 4 P CUT ESP CABLE AND CAP TUBE,SPOOL EXCESS TO SPOOLER. M/U PENETRATOR IN HANGER.TEST. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Ben Perry Eni Petroleum 'Sr.Ddg.Spvr. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative Ken Bogner Eni Petroleum Materials Coordinate Eni representative Satch Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Billington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Bill Petty Eni Petroleum HSE Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push David Hanson Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date CASING 51/2 4.950 L80 4,149.5 11,340.0 6/28/2013 Last Leakoff Test Depth(ftKB) TVD(ftKB) Fluid Type 'Fluid Density(lb/gal) IP Surf Applied(psi) Eq.Mud Weight(Ib/gal) Leak Off Pressure(psi) 4,351.0 3,514.55 OBM 9.201 603.0 12.50 2,282.7 Eni E&P Division I Well Name:OPO8-04L1 ft* ENI Petroleum Co.Inc. Daily Report Well Code:27293 Field Name:Nikaitchuq • API/l1WI:50-029-23424-60-00 2^ Date:7/2/2013 - Report#: 4 • " II page 1 of 1 Wellbore name: Sidetrack 1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type ALASKA ENI PETROLEUM 100.00 DIRECTIONAL Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 53.30 12.20 Rig Information Contractor Rig Name Rig Type NABORS ALASKA NABORS 245 E LAND RIG Job Information Wellbore Job Phase Spud Date 'Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) Sidetrack 1 COMPLETION 0.00 Daily Information End Depth(ftKB) End Depth('VD)(f...Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POE Temperature(°F) Weather Wind 0.0 87.0 43.0 Overcast Calm Daily summary operation 24h Summary SET HANGER,LOCK-DOWN,TES' U/L SEALS,INSTALL BPV. R/D CENTRILIFT TUBING RUNNING EQ.,R/D VD FRANKS CRT W/CRANE. N/D STACK,RISER,ELEC TEST ESP,N/U TUBING ADAPTER AND TREE. TEST HAN(ER AND TREE. SHUT-IN WELL,RELEASE RIG AT 16:00 Operation at 07.00 Spotting Drill module over well OP22 W W03 24h Forecast LAST DAILY REPORT Lithology Shows MAASP Pressure(psi) 'Mud Weight(lb/gal) 8.80 Time Log Start End Cur Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 01:00 1.00' 1.00 COMP K 4 P ,SET TUBING HANGER,LOCK-DOWN._PULL LANDING JT. TEST U/L HANGER BODY SEALS 5000 PSI/10 MIN. INSTALL BPV. 01:00 '04:00 3.00 4.00 COMP K 2 P R/D VD CENTRILIFT EQ,TOOLS,SHEAVES. R/D FRANKS CRT,HYD.CONTROL PANEL. 04:00 06:00 2.00 6.00 COMP K 2 P JACK OPEN CATTLE CHUTE. L/D FRANKS CRT HOSE BOX,HYD UNIT TO GROUND W/CRANE. JACK CATTLE CHUTE CLOSED. 06:00 1030 4.50' 10.50 COMP K 5 P N/D BOP STACK. R/D MOUSEHOLE CATCH-SKIRT,RISER,FLOWLINE,CHOKE AND KILL LINES. PICK AND STAND -BACK BOPS. N/D 10:30 12.00 1.50 12.00 COMP K 5 P N/D RISER,BREAK GREYLOCKS. CENTRILIFT COND TEST ESP-GOOD. N/U TUBING ADAPTER AND TREE. TEST HANGER VOID/PACK-OFF. PULL BPV,SET TEST PLUG. TEST TREE 5000 PSI/10 MIN. BLEED-OFF PRESS,PULL TEST PLUG. SECURE TREE AND WELL BAY. RELEASE RIG AT 16:00. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Bruce Simonson Em Petroleum Sr.Drlg.Spvr. 907-685-0710 Eni representative Craig Ruminer Eni Petroleum Drilling Supv. Eni representative Ken Bogner Eni Petroleum Materials Coordinato Eni representative Satoh Bowe Eni Petroleum Materals Coordinator 907-685-1491 907-299-0531 Eni representative Mitch Billington Eni Petroleum Rig Clerk 907-670-8601 Eni representative Bill Petty Eni Petroleum HSE Tool Push Mike Williams Nabors Alaska Drilling Tool Pusher 907-670-1492 Tool Push David Hanson Nabors Alaska Drilling Tour Pusher Last Casing seat Cas.Type OD(in) ID(in) Grade Top(EKE) Bottom(ftKB) Run Date CASING 51/2 4.950 L80 4,149.5 11,340.0 6/28/2013 Last Leakoff Test Depth(RKB) ITVD(ftKB) 'Fluid Type Fluid Density(lb/gal) 'P Surf Applied(psi) IEq.Mud Weight(lb/gal) Leak Off Pressure(psi) 4.351.0 3,514.55 OEM 9.20 603.0 12.50 2,282.7 I RECENED HALLIBURTON " AUG 0 8`2013 To: Alaska Oil and Gas Conversation Commission 333 W 7th Ave Suite 100 Anchorage, AK 99501 Attn: Howard Oakland From: Sperry Drilling - Alaska Attn: Robert Haverfield 6900 Arctic Blvd. Anchorage, AK 99518 907-273-3559 Office 907-273-3535 Fax Robert.Haverfield(c Halliburton.com Re: Eni Well — OP-041_1 & OP-041_1 PB 1 AFE # 4 ,E u(( Rig — Nabors 245 Oliktok Point —Nikaitchuq, Alaska Shipment induce-s: 1 End of Well Reports 1 Final Data Listing on CD-ROM 1 Sets of Final Logs —for each well contains: € 2" Color Log — Formation Evaluation TVD O 2" Color Log — Formation Evaluation MD O 2" Color Log — Drilling Engineering MD O 2" Color Log — Gas Ratio MD Received By: Print Name YY) Sign Name Date Please sign acknowledgement of receipt - email, fax, or mail back. Thank you. i3O ) $cblumberger 220 ")... O2 Drilling &Measurements MWD/LWD Log Product Delivery Customer ENI US Operating Co.Inc.Alaska Dispatched To: Makana Bender Well No OP08-04 L1 Date Dispatched: 3-Jul-13 Installation/Rig NABORS 245 Dispatched By: Hector Echeto Data No Of Prints No of CDs OP08-04 L1 Log 1 2 in MD 1 2 in TVD 1 5 in MD 1 5 in TVD 1 Received By: Please sign and return one copy to: D&M,2525 Gambell Street,Suite 400 Anchorage,Alaska 99503 hecheto @slb.com om Hector Echeto Fax:907-561-8317 Transmittal#:6155 0 13 ,otpi Schiumberger Drilling & Measurements / V MWD/LWD Log Product Delivery Customer ENI US Operating Co. Inc.Alaska Dispatched To: Makana Bender Well No OP08-04L1 PB1 Date Dispatched: 3-Jul-13 Installation/Rig NABORS 245 Dispatched By: Hector Echeto Data No Of Prints No of CDs OP08-O4L1 PB1 Log 1 2 in MD 1 2inTVD 1 5 in MD 1 5 in TVD 1 Received By: fd �� Please sign and return one copyto: J ` 3800 Centerpoint Drive,Suite 300 f f B Anchorage,Alaska 99503, Andrew Buchanan andrew.buchanan(c�enipetroleum.com Transmittal#:6155 �w %\or I%%%sv THE STATE Alaska ( )il and Gas ofALAsKA. Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue 6F *,q ALASil*P Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 James Wright Drilling and Completion Engineering Manager ENI US Operating Co. Inc. 3800 Centerpoint Drive, Suite 300 Anchorage, AK 99503 Re: Nikaitchuq Field, Schrader Bluff Oil Pool, OP08-04L1 ENI US Operating Co. Inc. Permit No: 213-061 Surface Location: 3197' FSL, 1576' FEL, SEC. 5, T13N, R9E, UM Bottomhole Location: 383' FSL, 4396' FEL, SEC. 29, T14N, R9E, UM Dear Mr. Wright: Enclosed is the approved application for permit to drill the above referenced development well. Please use updated Form 10-401 (Revised 10/2012) for submittal of all future Permit to Drill Applications. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, i Cathy P/Foerster Chair DATED this /7 day of May, 2013. RECEIVED STATE OF ALASKA AL, ,A OIL AND GAS CONSERVATION COMM, .ON MAY 0 6 2013 PERMIT TO DRILL /� 20 AAC 25.005 AOGCC 1 a.Type of Work: 1 b.Proposed Well Class: Development-Oil [J 4 Service- Winj U Single Zone El . 1c.Specify if well is proposed for: Drill 12 ' Redrill ❑ Stratigraphic Test ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re-entry El ' Exploratory ❑ Service- WAG ❑ Service-Disp ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: Blanket El Single Well El 11.Well Name and Number: ENI US Operating Co.Inc. Bond No. RLB0008627. OP08-04L1 3.Address: 6.Proposed Depth: 12.Field/Pool(s): 3800 Centerpoint Drive Suite 300,Anchorage 99503 MD: 11350 • TVD: 3761 • Nikaitchuq/Schrader Bluff• 4a. Location of Well(Governmental Section): 7.Property D i nfti n(Lea Number): pith Surface: 3197 FSL 1576 FEL S5 T13N R9E UM ® 373-361AUL 'g8�,�o0� S/t°I6 Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 709 FSL 1672 FEL S32 T14N R9E UM* ADL 417493 6/5/2013 Total Depth: 9.Acres in Property: •'1`a`�14.Distance to Nearest Property:�� 383 FSL 4396 FEL S29 T14N R9EUM ' 4.289-375 7,is �t 76-°O0 -64- to unit boundary S-ir.,/6 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 54.1 ' 15.Distance to Nearest W I Open A3oo 0r' S- y s\is)P Surface:x- 516704 y- 6036551 Zone- 4 GL Elevation above MSL: 13.1 to Same Pool: 2579'to?jA 16.Deviated wells: Kickoff depth: "/Cc I, -399-feet AZA15 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) ✓ Maximum Hole Angle: 97.25 degrees• Downhole: -1673 psig Surface: 1267 psig• 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) Driven 20" 178.89 X-65 Welded 160 36 36 160 160 Pre-Installed 2333 ZIS7- 16" 13-3/8" 68 L-80 BTC #N/A 35 35 #N/A #N/A In Place/Completed f�S G 2 12.25" 9-5/8" 47 L-80 Hydril 563 #N/A 33 33 # /A I 3#N/A i In Place/Completed 5•/.1 .S • 5-1/2" 15.5 L-80 Hydril 521 6950 4400 3526 11350 3761 Sidetrack-Liner in open hole 9' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): none Casing Length Size Cement Volume MD TVD Conductor/Structural 154' 16' 154' 154' Surface 2333' 13-3/8" 425 bbl/12#/gal-Articset lite 2333' 2150' Intermediate 4999' 9-5/8" 101.1 bbl Deeperete 4999' 3629' Production Liner 6114' 5-1/2" 11113' 3706' Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat 0 " BOP Sketch El . Drilling Program El ■ Time v.Depth Plot El Shallow Hazard Analysis el Diverter Sketch❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements El 21. Verbal Approval: Commission Representative: Date 5/6/2013 22. I hereby certify that the foregoing is true and correct. Contact James Wright 907 865 3321 Printed Name James Wright - Title Drilling and Completion Engineering Manager Signature �yyya L � Phone (907)865-3321 Date 5/6/2013 Commission Use Only Permit to Drill J API Number: c,0 Permit Approval /1 See cover letter for other Number: 2 I 0 b I 50- O2 -231-121i- -00 Date: C 1 t l I 7 requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: d Other: * 3560 p5.; 156 P -7;-.54- Samples req'd: Yes❑ No2 Mud log req'd: Yes ❑ No[,]" H2S measures: Yes❑ No Directional svy req'd: Yes ❑ No El Si,tFxckd-;.„ 'A/ rEd. a YES 2ND ,-- /) A PROVED BY THE COMMISSION DATE: 6-'" 1 7 -/3 �JC y- ,COMMISSIONER . /ci ,c-•lam•I? _ RECEIVED MAY 062013 r Imn ID, t Ileum AAOGCC 3800 Centerpoint Drive Suite 300 Anchorage,Alaska 99503 James Wright Phone(907)865-3321 Email: James.Wright@enipetroleum.com May 6,2013 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage,Alaska 99501 RE: Application for Permit to Drill/Sidetrack Producer OP08-04L1 Dear Commissioners, Eni US Operating Co. Inc. hereby applies for a Permit to Drill (Sidetrack Existing Well OP08-04) for the Onshore Producer well OP08-04L1. This well will be drilled/sidetracked and completed using Nabors rig 245.The planned spud date is 6/06/2013. The proposed plan is to cut a window in the 9 5/8" casing at 4,600' MD (3,587' TVD) and then drill a horizontal wellbore that ungulates between the OA, OA2, and OA3 sands to a final depth of 11,350 MD (3,761 TVD). 5 '/2"slotted liner will be run into the open hole. Please find attached for the review of the Commission forms 10-401, the information required by 20 ACC 25.005. If you have any questions or require further information, please contact James Wright 907-865- 3321. ENT_ c : 1( bt. g, Sincerel �1 ( � eo (,21./ � - or Ja .. right as iwOz SS e,vc. Drilling and Completions Engineering Manager `r` ' U v S-I3 13 I' STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION APR 1 4 2010 PERMIT TO DRILL 20 AAC 25.005 ,. ,_ • "Ito .::'...r la.Type of Work: 1b.Proposed Well Class: Development-Oil in Service- Winj II Single Zone • - c. pe ,r"1iti proposed for: Drill J Redrill ❑ Stratigraphic Test ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone ''' r r s pP Y P ❑ Coalb �' �' as Hydrates ❑ Re-entry ❑ Exploratory ❑ Service- WAG ❑ Service-Disp ❑ Shale Gas ❑ 2.Operator Name' 5. Bond: Blanket J Single Well ❑ 11.Well Name and Number: ENI US Operating Co Inc Bond No. RLB0008627 OP08-04 3.Address: 6.Proposed Depth: 12.Field/Pool(s): 3800 Centerpoint Drive Suite 300,Anchorage 99503 MD: 10926 TVD: 3759 - 4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number): Nikaitchuq Surface: 3197 FSL 1576 FEL S5 T13N R9E UM ADL 0373301,ADL 0355024,ADL 0390616 Top of Productive Horizon: 8.Land Use Permit 13.Approximate Spud Date: 1066 FSL 1663 FEL S32 T14N R9E UM ADL 417493 6/26/2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 106 FSL 4267 FEL S29 T14N R9E UM 1280 617' fn/--n i f 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 52.2 15.Distance to Nearest Well Open ifi. to Surface:x- 516704 y- 6036551 Zone- 4 GL Elevation above MSL: 12.2 to Same Pool: 2579' M OF953. 16.Deviated wells: Kickoff depth: 300 feet 17.Maximum Anticipated Pressures in psig(see 20 MC 25.035) v - Maximum Hole Angle: 90.79°degrees Downhole: 1620.72 Surface: 1227.69 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) Driven 20" 178.89 X-65 Welded 154 Surface Surface 154 154 pre-installed 674 TOTAL sx 16" 13-3/8" 68 L-80 BTC 2309 Surface Surface 2349 2152 LEAD:443 sx 10.7 ppg ASL --• TAIL:231 sx 12.0 ppg DeepCrete 12.25" 9-5/8" 47 L-80 BTCM 4868 Surface Surface 4908 3625 325 TOTAL sx 325 sx 12.5 ppg DeepCrete 8.5" 5.5" 17 L-80 DWC - 6218 4708 3603 10926 3759 Slottled liner in open hole 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(R): Junk(measured): Casing Length Size Cement Volume - ',--"--Th . TVD Conductor/Structural Surface Intermediate Production ov, Liner , Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat is BOP Sketch IS Drilling Program El Time v.Depth Plot ❑ Shallow Hazard Analysts El Diverter Sketch 0 Seabed Report ❑ Drilling Fluid Program El 20 MC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct. Contact Joseph Longo t 907-865-3323 Printed Name Maurizio Grandi \ Title Well Operation Project Manager Signature 1`� n- 1 Phone Date //3/ 0■ Commission Use Only ((( Permit to Drill �7 , f/1 API Number: / Permit Ap o See cover letter for other Number: //L"C LI r 50.[iZ-�l Z�7Z�"042.00 Date: requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane as hydrates,or gas contained in shales- Other: 4' 3500 p !3 o o'r's f_ Samples req'd: Yes f No[� Mud log req'd: Yes ❑ No [i jJ 11 a -' / H2S measures: Yes ] No Directional svy req'd: Yes ['No ❑ 7t 25-oo DSc Ank wt� /C.S# `hu-.� 1 I J F I i4 1 - .,.,,jj�/ DATE: - APPROVED BY THE COMMISSION ,COMMISSIONER ALAsEtii.\\ SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Maurizio Grandi Well Operation Project Manager ENT US Operating Co. Inc. 3800 Centerpoint Drive, Suite 300 Anchorage, AK 99503 Re: Nikaitchuq Field, Undefined Oil Pool, OP08-04 ENI US Operating Co. Inc. Permit No: 210-041 Surface Location: 3197' FSL, 1576' FEL, S5, T13N, R9E, UM Bottomhole Location: 106' FSL, 4267' FEL, S29, T14N, R9E, UM Dear Mr. Grandi: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may r- . • t in the revocation or suspension of the permit. Sincerely, 1/0 b i Daniel T. Seamount, Jr. I� Chair DATED thisZZ17d`ay of April, 2010. cc: Department of Fish & Game, Habitat Section w/o end. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) ■■• Emu (-',,tIPoIeum Application for Permit to Drill OP08-04L1 Saved:6-May-13 Application for Permit to Drill Document Producer Well OP08-04L1 Table of Contents 1. Well Name 3 Requirements of 20 MC 25 005(0 3 2. Location Summary 3 Requirements of 20 MC 25.005(c)(2) 3 Please see Attachment 6;Surface Platt 3 Requirements of 20 MC 25050(b) 3 3. Blowout Prevention Equipment Information 4 Requirements of 20 MC 25005(c)(3) 4 4. Drilling Hazards Information 4 Requirements of 20 MC 25005(c)(4) 4 5. Procedure for Conducting Formation Integrity Tests 4 Requirements of 20 MC 25 005(c)(5) 4 6. Casing and Cementing Program 5 Requirements of 20 MC 25.005(c)(6) 5 7. Diverter System Information 5 Requirements of 20 MC 25005(c)(7) 5 8. Drilling Fluid Program 6 Requirements of 20 MC 25.005(c)(8) 6 Intermediate Hole Mud Program 6 (LSND) 6 Lateral Mud Program 6 (MI FazePro Mineral Oil Base) 6 9. Abnormally Pressured Formation Information 6 Requirements of 20 MC 25.005(c)(9) 6 10. Seismic Analysis 6 Requirements of 20 MC 25 005(c)(10) 6 AOGCC PERMIT DocumenLdoc Page 1 of 7 Printed:6-May-13 i 1 _ - ' . EMI 'J ltIr®H u '- -.:.* 6 Application for Permit to Drill OP08-04L1 Saved:6-May-13 11. Seabed Condition Analysis 6 Requirements of 20 MC 25.005(c)(11) 6 12. Evidence of Bonding 7 Requirements of 20 MC 25.005(c)(12) 7 13. Proposed Drilling Program 7 Requirements of 20 MC 25.005(c)(13) 7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal 7 Requirements of 20 MC 25.005(c)(14) 7 15. Attachments 7 Attachment 1 Drilling Procedure 7 Attachment 2 Directional Plan 7 Attachment 3 Drilling Hazards Summary 7 Attachment 4 BOP and Diverter Configuration 7 Attachment 5 Formation Integrity And Leak Off Test Procedure 7 Attachment 6 Surface Platt 7 Attachment 7 Casing Design Program 7 AOGCC PERMIT Document.doc Page 2 of 7 Printed:6-May-13 Enhi ' trsieurn Application for Permit to Drill OP08-04L1 Saved:6-May-13 1. Well Name Requirements of 20 AAC 25 005(f) Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20 AAC 25.040(6). For a well with multiple well branches, each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. Well Name: OP08-04L1 2. Location Summary Requirements of 20 AAC 25005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (2)a plat identifying the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface,at the top of each objective formation,and at total depth, referenced to governmental section lines (B)the coordinates of the proposed location of the well at the surface,referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration; (C)the proposed depth of the well at the top of each objective formation and at total depth; Location at Surface 3197 FSL 1576 FEL S5 T13N R9E UM ASP Zone 4 NAD 27 Coordinates RKB Elevation 54.1'AMSL Northing: 6,036,550.67' Easting:516,703.94' Pad Elevation 13.1'AMSL Location at Top of Productive Interval 709 FSL 1672 FEL S32 T14N R9E UM ("OA"Sand) ASP Zone 4 NAD 27 Coordinates Measured Depth, RKB: 4,936' Northing: 6,039,340.25' Easting: 516,593.34' Total Vertical Depth, RKB: 3,623' Total Vertical Depth, SS: 3,570' Location at Total Depth 383 FSL 4396 FEL S29 T14N R9EUM ASP Zone 4 NAD 27 Coordinates Measured Depth, RKB: 11,350' Northing: 6,044,287.80 Easting: 513,843.60 Total Vertical Depth, RKB: 3,761' Total Vertical Depth, SS: 3,708' Please see Attachment 6:Surface Platt and (D)other information required by 20 MC 25.050(6); Requirements of 20 AAC 25050(b) If a well is to be intentionally deviated, the application for a Permit to Drill(Form 10-401)must (1)include a plat, drawn to a suitable scale,showing the path of the proposed wellbore,including all adjacent wellbores within 200 feet of any portion of the proposed well; Please see Attachment 2: Directional Plan and (2)for all wells within 200 feet of the proposed wellbore (A)list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished a copy of the application by certified mail;or (B)state that the applicant is the only affected owner. The Applicant is the only affected owner. AOGCC PERMIT Document.doc Page 3 of 7 Printed:6-May-13 *i. Em '7\-rid .--\ um Application for Permit to Drill OP08-04L1 Saved:6-May-13 3. Blowout Prevention Equipment Information Requirements of 20 MC 25.005(c)(3) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (3)a diagram and description of the blowout prevention equipment(BOPE)as required by 20 MC 25.035,20 MC 25.036, or 20 MC 25.037,as applicable; Please see Attachment 4: BOP and Diverter Configuration 4. Drilling Hazards Information Requirements of 20 MC 25.005(c)(4) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (4)information on drilling hazards,including (A)the maximum downhole pressure that may be encountered, criteria used to determine it,and maximum potential surface pressure based on a methane gradient; The expected reservoir pressure in the Schrader Bluff sand is 0.45 psi/ft, or 8.6 ppg EMW (equivalent mud weight). The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methan • -n (0.11), and t e • • --• ,-•' -1 depth of the OA sand formation is: MPSP = (3,687 TVDss)(0.45 - 0.11 psi/ft) ,,v- = 1267 psi ata on potential gas zones; The well bo 's-net-ex:-- -: : .- - ra a any gas zones. and (C)data concerning potential causes of hole problems such as abnormally geo-pressured strata,lost circulation zones, and zones that have a propensity for differential sticking; Please see Attachment 2: Drilling Hazards Summary. 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 MC 25.005(c)(5) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (5)a description of the procedure for conducting formation integrity tests, as required under 20 MC 25.030(1); ✓ Please see Attachment 5: Formation Integrity And Leak Off Test Procedure AOGCC PERMIT Document.doc Page 4 of 7 Printed:6-May-13 i ft* ■ .Enii (_tirokurn Application for Permit to Drill OP08-04L1 Saved:6-May-13 6. Casing and Cementing Program Requirements of 20 MC 25005(c)(6) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (6)a complete proposed casing and cementing program as required by 20 MC 25.030,and a description of any slotted liner,pre- pen`orated liner, or screen to be installed; 5 1/2" will be run into the 8 1/2"sidetrack. No cementing will be required Casing and Cementing Program �'° See also Attachment 4: Cement Summary 545---e . Hole Top Btm Csg/Tbg Size Weight Length MD/TVD MD/7YD OD(in) (in) (lb/1t) Grade Connection (ft) (ft) (ft) Cement Program 20 Driven 178.89 X-65 Welded 120 36/ 36 1607 160' Installed A- 2 30/2i7z- 13-3/8 16 68 L-80 BTC 2984 35/ 35 3O 9'"/24242 Complete 'ftYR 341.7 9-5/8 12-1/4 47 L-80 Hydril 563 33/ 33 1 '/ 3WF Complete 8-3/4"OA New Liner in Open Hole _F 5-1/2 Sand 15.5 L-80 Hydril 521 6,950' 44007 3536' 113507 3761' -no cement Lateral 1'2'71o54 7. Diverter System Information Requirements of 20 MC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (7)a diagram and description of the diverter system as required by 20 MC 25.035, unless this requirement is waived by the commission under 20 MC 25.035(h)(2); Please see Attachment 4: BOP and Diverter Configuration. AOGCC PERMIT Document.doc Page 5 of 7 Printed:6-May-13 ft* Rat Enil • Application for Permit to Drill OP08-04L1 Saved:6-May-13 8. Drilling Fluid Program Requirements of 20 MC 25.005(c)(8) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (8)a drilling fluid program,including a diagram and description of the drilling fluid system,as required by 20 MC 25.033; Drilling will be done with muds having the following properties over the liste in - als: Intermediate Hole Mud Program Lateral Mud Program (LSND) 7 (MI FazePro Mineral Oil Base) 13-3/8"Csg Shoe to 9-5/8"Csg Po Value Value Density(ppg) , 8.7-9.4 Density(ppg) 8.8 - •. Plastic Viscosti ' 15 - 25 \' Funnel Viscosity _ 60 (CP) _ •(seconds) Yield Point 15 - 20 Plastic Viscosti 12 - 18 (lb/100 0) (CP) HTHP Fluid loss Yield Point (m 1/30 min @ <5.0 (/b/100 18-24 200psi&100°F API Filtr•to 4 - 6 Oil/Water 60/ 40 (cc/3 I min)) Ratio Ch/or es(mg//) <500 Electrical >600 pH 9.0- 10.0 Stability MBT <18.0 Drilling fluid practices will be in accordance with appropriate regulations stated in 20 MC 25.033. 9. Abnormally Pressured Formation Information Requirements of 20 MC 25.005(c)(9) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (9)for an exploratory or stratigraphic test well,a tabulation setting out the depths of predicted abnormally geo-pressured strata as required by 20 MC 25.033(1); Not applicable: Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20 MC 25005(c)(10) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (10)for an exploratory or stratigraphic test well, a seismic refraction or reflection analysis as required by 20 MC 25.061(a); Not applicable: Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis Requirements of 20 MC 25.005(c)(11) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (11)for a well drilled from an offshore platform, mobile bottom-founded structure,jack-up rig, or floating drilling vessel, an analysis of seabed conditions as required by 20 MC 25.061(b); Not applicable: Application is not for an offshore well. AOGCC PERMIT Document.doc Page 6 of 7 Printed:6-May-13 i ■ End Petroleum Application for Permit to Drill OP08-04L1 Saved:6-May-13 12. Evidence of Bonding Requirements of 20 MC 25.005(c)(12) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (12)evidence showing that the requirements of 20 AAC 25.025{Bonding}have been met; Evidence of bonding for ENI is on file with the Commission. 13. Proposed Drilling Program Requirements of 20 MC 25.005(c)(13) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: Please refer also to Attachment 1—Drilling Procedure 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 MC 25.005(c)(14) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (14)a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 AAC 25.080 for an annular disposal operation in the well.; Waste fluids generated during the drilling process will be disposed of by injection down an Oliktok Point or Spy Island Class I disposal well. Alternative disposal method will include hauling the fluids to the Prudhoe Bay Grind and Inject Facility. 15. Attachments Attachment 1 Drilling Procedure Attachment 2 Directional P/an Attachment 3 Drilling Hazards Summary Attachment 4 BOP and Diverter Configuration Attachment 5 Formation Integrity And Leak Off Test Procedure Attachment 6 Surface Platt Attachment 7 Casing Design Program AOGCC PERMIT Document.doc Page 7 of 7 Printed:6-May-13 MD Inc! A71m True TVDSS TVD VSEC 449 EW TF DLS Directional Exclusion Zone Exclusion Zone Northing Resting Comments (ft) (°) r) (ft) (6) (ft) (ft) (ft) (•) C/100ft)Difficulty Index Alert A"�;1 (6U8) (NIPS) 730000 87.69 355.54 3870.33 3723.63 453825 5076.32 -32.64 8191 3.50 8.28 79.55 6041626.39 51665988 0P08-04L1 Tot9 7361.78 88.00 35140 387285 372595 4595.69 5137.75 -36.59 60.581 350 6.28 8000 604168780 518853.80 7400.00 8813 352.17 347381 3727.11 4831.65 517567 -43.39 80541 150 018 8081 604172570 515648.92 End Cry 746702 89.47 35002 3874.98 3728.28 4695.35 5241.87 -5376 HS 3.50 6.30 8171 604179187 516838.40 Cry 375/100 7477.65 89.47 35002 3675.08 372838 470551 525233 -55.80 90.79L 000 5.30 81.71 604180233 515838.53 750000 8946 34918 387529 372859 4728.93 527131 -59.64 90.781 375 635 8178 604182430 51883145 700000 8941 34543 3878.28 3729.58 482181 537185 -81.61 90.751 375 033 82.03 8041921.77 518610.26 0008-0411 Tat10 7611.51 89.40 345.00 3670.40 3729.70 4835.07 538298 -84.54 99.691 375 8.33 8208 604193290 51660730 7700.00 8884 34173 367776 3731.08 492209 5487.74 -10987 99.641 375 8.35 81.81 8042017.59 51658179 End Cry 7747.05 88.55 33999 367083 373113 496888 551218 -125.29 HS 175 8.36 8189 6042061.99 516566.26 Cry 3.75/100 776082 8155 33999 367918 373258 498031 5528.88 -131.37 124.511 0.00 6.36 81.69 6042078.86 51658015 7800.00 8780 338.90 388040 373370 502128 5561.79 -143.72 124.471 3.75 037 81.05 8042111.56 516547.73 0708-0411 Tat 11 788138 88.50 33700 3683.45 373675 508231 581859 -166.72 127151 3.75 6.38 79.96 0042188.30 51652480 790000 8583 335.84 3086.10 373940 5120.79 585392 -18114 127.081_ 3.75 8.39 79.21 0042203.59 51850910 End Cry 799899 83.39 332.88 3595.57 3748.87 5219.28 5742.73 -224.78 HS 3.75 0.41 77.33 6042292.30 516466.27 800000 8339 332.86 3095.69 3741199 5220.28 5743.82 -22524 HS 000 041 7713 6042293.19 51640581 Cry 3.75/100 8026.48 8139 332.86 3698.73 3752.03 5241156 5787.01 -23723 15.481 0.00 6.41 7733 6042318.55 518453.77 8100.00 88.05 33112 370510 3758.80 5319.78 5831.96 -271.05 15.411 375 043 6006 0042381.41 518419.81 0708-0411 Tot 12 811237 86.50 33200 370830 3759.80 533112 5842.88 -27683 10081_ 175 043 80.51 8042392.30 516414.00 8200.00 8974 331.43 370918 376248 5419.67 5919.98 318.33 10041 3.75 6.45 8379 604240931 518372.33 End Cry 820535 8993 331.39 370919 3782.49 5425.02 592467 -32088 HS 175 645 8389 604247400 51536976 Cry 3.75/100 8239.14 89.93 33139 3709.23 3762.53 5458.79 5954.33 -33707 96841 0.00 6.45 8399 604250163 518353.52 8300.00 8957 329.12 3709.44 3782.74 5519.58 6007.18 36726 91631 3.75 5.48 84.00 604255690 516323.21 0708-0411 Tot 13 836239 8940 32080 3709.95 378325 558173 6060.06 -40035 91581 175 648 84.02 604260920 515290.00 8400.00 8931 32139 3710.37 376367 5019.06 6091.27 -42133 93.551 3.75 5.48 84.11 804264038 516268.96 8500.00 8908 321.85 3711.77 3785.07 571766 617186 -48077 93491 3.75 050 84.38 604272560 516209.34 End Cry 8501.76 8908 32118 371180 376510 5719.39 617304 -481.86 05 3.75 8.50 8437 804272198 51620025 Cry 4/100 8519.91 89.08 32118 3712.09 3785.39 5737.18 6167.26 -49114 80681 000 0.51 84.37 6042730.17 516198.94 8800.00 8927 31838 371125 3788.55 5815.19 8248.58 -544.62 80.531 400 8.52 84.99 5042797.37 51614532 0708-0411 Tat 14 861215 8930 317.90 371340 3768.70 581893 625763 -552.73 88.121 400 8.52 8508 0042806.40 516137.20 8700.00 89.42 31439 3714.38 378708 5910.98 5320.98 -013.58 88.08L 400 6.54 85.89 8042859.59 516078.21 End Cry 879713 8955 31049 371527 3768.57 800227 6386.78 -085.54 45 4.00 6.56 8638 0042935.22 51800411 8800.00 89.55 310.49 371529 3768.59 6004.55 5388.36 -08742 HS 0.00 0.56 88.38 6042938.82 518002.22 Cry 5/100 8832.22 89.55 31049 3715.54 376884 603431 6409.28 -711.92 91791 0.00 8.55 86.38 0042957.68 515977.68 0708-0411 Tot 15 886105 13905 309.00 371580 376910 606172 642035 -734.88 90.291 5.00 057 8050 804297070 515954.70 8900.00 89.44 30710 371017 376947 609012 8451.74 -76474 90.271 500 8.58 86.77 0043000.02 51592477 9000.00 6942 30210 3717.15 377048 6184.05 6508.51 -847.02 91.221 5.00 13.60 87.50 804305060 51584237 End Cry 914717 89.41 299.73 3717.55 3770.95 622428 6532.90 -887.75 HS 500 061 87.85 6043080.89 51580159 9100.00 8941 299.73 371019 377149 620017 8558.94 933.36 HS 0.00 8.61 8785 604310083 51575583 Cry 5/100 9100.08 8941 299.73 3718.19 3771.49 626824 8558.98 -933.43 2.096 0.00 0.61 87.85 0043108.87 515755.88 0P08-0411 Tat 18 9111.88 90.00 299.75 3718.25 377155 627010 6584.84 943.08 1788 5.00 6.81 8043 6043112.70 515745.60 9200.00 94.40 299.98 3714.87 3768.17 8351.80 5508.66 -1020.02 2.79R 500 6.03 8725 804315035 51566916 End Cry 9256.98 9715 30010 370909 376239 5399.38 6037.03 -108910 HS 5.00 8.84 84.48 6043184.01 515620.03 Cry 5/100 928780 97.25 300.10 370522 3758.52 542485 6652.28 -109537 177R 0.00 015 84.46 6043199.78 515593.73 930000 9083 300.14 3703.73 3757.03 5435.19 6658.44 -1106.02 177.018 5.00 6.55 85.08 604320193 515583.06 0708-0411 Tat 17 9362.63 93.50 300.30 359820 3751.50 6487.63 6689.84 -1159.92 178.460 5.00 6.06 88.19 6043237.20 515529.10 9400.00 91.03 300.42 389053 3749.83 8519.08 8708.70 -1192.13 176.478 500 687 89.95 604315599 515496.85 End Cry 9436.77 89.80 300.53 3896.07 3749.37 6550.08 6717.35 -1223.82 HS 5.00 667 8011 8043274.57 515465.12 950000 8980 300.53 389829 374919 680339 6759.47 -127828 HS 0.00 688 88.11 6043306.56 515410.59 Cry 3/100 959554 8980 300.53 3090.62 3749,92 0683.99 6808.00 -136058 670 000 8.69 8011 6043354.90 51532819 9600.00 8985 300.85 389583 3749.93 568775 6810.27 -1384.42 676 3.00 689 88.15 6043357.16 515324.35 0708-0411 Tat 18 961212 9000 30100 3696.65 3749.95 8898.43 0816.73 -137525 70.07R 300 5.89 8824 604336150 515313.50 End Cry 9687.71 90.75 30113 389518 3749.46 678283 6856.59 -1438.89 HS 100 071 8885 604340331 515249.78 970000 90.75 30113 309600 3749.30 8773.48 6863.31 -1449.18 HS 0.00 171 88.85 6043410.00 515239.48 9800.00 90.75 303.13 3694.70 371800 6800.18 401795 -1532.92 115 000 672 8885 6043484.45 515155.63 Cr,2/100 984890 90.75 303.13 389408 3747.36 8902.57 6994.57 -1573.87 108.59R 0.00 6.72 88.85 8043491.08 515114.62 070844/1 Tat 19 988230 9066 303.38 369390 3747.20 8914.21 695202 -158507 110.87R 2.00 6.72 138.53 604340140 515103.40 End Cry 9874.77 90.57 30361 389177 3747.07 802506 4058.91 -1595.47 115 200 6.73 88.41 604350525 515092.99 990000 90.57 303.61 389151 374681 8047.04 407287 -1616.48 HS 0.00 6.73 88.41 604351917 515071.95 1000000 90.57 30361 309152 374582 7034.16 7028.22 -169978 HS 000 6.74 88.41 604357034 51498856 1010000 9057 303.61 3891.52 3744.82 712128 708158 -1783.03 HS 0.00 6.75 88.41 604362950 514905.17 Cry 2/100 10101.52 90.57 30381 309151 374481 7122.80 7084.12 -178430 91.681 0.00 075 88.41 6043630.34 514903.90 0708-0411 Tat20 1011218 90.57 30140 389110 374470 7131.87 7000.30 -179118 94.171. 100 6.75 88.43 6043036.20 514895.00 End Cry 10116.39 90.56 303.32 3891.36 3744.66 713154 709152 -179670 HS 2.00 075 8844 604363851 514891.47 10200.00 90.58 303.32 389054 3743.84 7208.18 7138.54 -188057 HS 0.00 078 88.44 0043684.27 514821.52 10300.00 90.56 303.32 3889.57 3742.87 7195.03 7103.46 -1950.13 HS 0.00 6.77 8844 8043739.00 514737.84 Cry 2/100 1033134 90.58 303.32 368020 3742.56 7322.25 721057 -197632 86.181 0.00 6.77 8844 6043756.15 514711.61 0708-0411 Tat 21 10382.20 90.80 302.70 368895 374225 7348.98 7227.49 -200220 82891 100 077 8057 604377290 514685.70 End Cry 10382.82 90.65 302.29 368873 3742.03 7366.58 7238.45 -2019.41 HS 100 078 88.89 604378383 514068.46 10400.00 90.65 30129 368053 3741.83 7381.51 7247.71 -2034.11 HS 0.00 5.78 8869 0043703.08 514053.75 10500.00 90.55 30129 3687.39 3740.89 748747 7301.16 -211883 HS 0.00 079 88.89 604384631 51458911 Cry 5/100 1055881 90.05 302.29 3688.72 3740.02 7518.03 7332.58 -218834 173851 0.00 8.79 8889 6043877 81 514519.34 10600.90 8861 30207 3686.09 3740.29 7553.40 7354.52 -2203.20 173651 500 680 8670 604389947 514484.43 0708-0411 Tot22 1061218 88.00 302.00 368735 3740.65 7563.83 730097 -221312 175.051 500 6.80 86.11 604390590 514474.10 End Cry 1069383 8394 301.72 309308 3746.38 7833.35 740385 -2282.52 HS 500 6.82 8114 8043948.02 514405.01 1070000 8394 301.72 369175 374705 7838.77 7407.16 -228790 HS 000 682 8114 604395194 514399.62 Cry 5/100 1077004 8194 30172 3701.21 3754.51 7598.79 7494.11 -234765 8951 0.00 682 8114 6043988.73 514339.79 1080000 85.39 301.49 370394 3757.24 7723.74 745943 -2372.55 8.931 5.00 5.83 83131 6044003.99 514314.86 0708-0411 Tat23 10883.01 88.50 30100 370730 3760.60 7777.23 7492.07 -242635 9371 500 6.84 88.78 504403050 51426100 End Cry 1089302 90.00 300.75 3707.70 3781.00 7802.98 7507.67 -245294 HS 500 684 88.26 0044052.04 514234.87 1090000 90.00 300.75 3707.70 3761.00 7808.54 7511.03 -2458.09 HS 0.00 5.85 8828 6044055.39 514219.21 11000.00 90.00 300.75 3707.70 3751.00 789111 756117 -254403 HS 0.00 6.85 88.28 6044106.33 514143.17 1110000 91.00 300.75 3707.70 3781.00 7977.67 761130 -2629.97 HS 000 6.86 88.28 004415726 514057.12 Cry 2/100 11100.18 9100 300.75 370770 376100 7977.82 7613.30 -2630.12 04.630 000 5.88 58.28 5044157.35 51405897 0708-0411 Tot24 11112.60 8998 301.00 3707.70 3781.00 798034 761976 -2640.78 98.070 2.00 088 8822 604416170 51404030 End Cry 1114528 89.91 30115 3707.73 3781.03 8016.15 7636.75 -2068.70 HS 2.00 5.87 88.05 6044180.63 514018.35 1120000 89.91 301.55 3707.82 3781.12 8062.88 7665.47 -271528 45 0.00 087 88.05 6044200.23 513971.70 1130000 8991 30115 3707.97 3781.27 8148.27 7717.94 -2800.41 HS 0.00 088 8805 6044201.51 513888.47 TD 1135039 8991 30185 370805 378135 819122 7744.33 -284322 0.00 689 88.05 604428760 51384150 Survey Type: DN Plan 11...111--/lff:��n C 44CC 73 ■1:L..14..1.....\n1:L4..L 10..:..4lnono fA\nfl1O 7341 4\n171n0 7341 4 1174\ 0/0/07340 473•00 AfA 17......0..f 0 6..... OP08-04L1(P1)Proposal Geodetic Report lichloiYerese . ,,,..: (Dot Plan) Report Date: April 01.2013-03:54 PM Survey/DLS Computation: Minimum Curvature/Lubineki Client: ENI Vertical Section Azimuth: 333.010°(True North) Field: Nikalthup y. Vertical Section Origin: 0000 fl,0.000 ft Structure le:Slot: Oliklo-4L1 OPOeF�$fb"itl w`.■�Mr Seabed/Ground Elevation: 12.200 ft above ove MSL TVD Reference Datum: Rotary Table Well: OP08-09 asMM' Borehole: OPOB-0411 API/1: 500292342460 Magnetic Declination: 19.587° Survey Nam.: OP08-04L1(Pt) Total Gravity Field Strength: 10020097090(980885 Based) Survey Date: April 01,2013 Total Magnetic Field Strength: 57802.281 nT Tort/AHD/DDI/ERD Ratio: 270053°1 9147.488 fl/6.888 12.425 Magnetic Dip Angle: 81.057° Coordinate Reference System: NAD27 Alaska Sob Plane,Zone 04,US Feet Declination Date: December 31,2013 Location Lat/Long: N 70°30.39 78185°,W 149°51'4791950- Magnetic Declination Model: BGGM 2012 Lomitidn Grid PRE'FA: N 8036550670 SUS,E 518703.990 SUS North Reference: True North CRS Grid Convergence Angle: 0.1289° Grid Convergent Used: 0 0000° Grid Seale Factor: 0.99990032 Total Corr Meg North.oTrue North: 19.5871° Local Coord Referenced To: Well Head MD Inel Azle True TVDSS TVD VSEC NS EW TF DL Exclusion Zone S Directional Exclusion Zone Northing Fasting Comments (ft) (°) r) (8) (ft) (ft) (fl) (ft) C) (°/1008) Difficulty Index Alert Angle (MIS) (8US) RTE 000 0.00 0.00 -5310 0.00 0.00 0.00 000 03.88M N/A 900 8.94 6036550.87 51670394 11150 0.09 63.88 59.20 112.50 0.00 0.04 0.08 345.740 0.08 000 8.88 6038550.71 518704.02 172.58 0.89 345.74 11928 172.58 045 0.51 0.01 35199M 1.48 0.00 8.22 0038551.18 518703.95 203.04 178 35199 149.73 203.03 113 111 -0.12 3.54M 2.98 018 7.41 6036551.88 51670382 27561 4.14 3.54 22220 27850 4.45 4.94 -0.11 2.63M 3.34 1.33 Alert 5.09 6030555.61 518703.82 366.81 5.92 263 313.04 388.34 11.38 1193 0.31 8.23M 1.95 1.90 FM 170 8038583.59 516704.22 459.85 5.5a 823 40541 458.72 1922 22.15 1.17 10.290 0.72 2.18 FM 308 603657183 518705.00 551.95 007 1029 497.24 550.54 28.75 3119 168 784M 0.60 2.38 Fai 111 603858206 518708.55 644.69 7.82 784 589.30 642.80 35.84 4146 4.40 3.34M 102 2.59 Fed 2.07 603859114 51870824 740.49 1041 334 683.88 737.18 4868 5757 577 1130 279 2.84 Fai 3.09 603000024 516709.58 834.52 1123 418 776.24 829.54 63.85 75.18 8.93 38.781 0.89 2.98 FM 3.52 603002888 516710.70 89664 12.19 085 837.07 890.37 74.82 8777 7.47 2,878 1.89 3.09 Alert 4.09 6030038.45 516711.21 993.08 1523 143 930.75 98005 94.97 110.62 794 6.43R 118 3.27 7.27 6036861.30 516711.63 1089.72 2029 3.07 1022.75 1078.05 120.05 140.08 915 13.720 5.20 3.49 11.98 803089074 518712.77 1188.30 23.04 810 1112.31 116861 151.56 17008 11.77 7.011 3.56 3.88 1814 6038728.76 510715.31 128007 2728 4.13 1196.97 1250.27 185.89 21824 14.99 8 881 3.89 3.81 1878 803876892 516718.44 1376.83 3129 191 1181.35 1334.85 226.65 28348 1787 91.548 4.21 3.95 2285 6030814.14 516721.21 1473.10 31.28 3.90 1383.63 1418.93 26977 313.38 20.84 165.41L 053 4.04 22.79 603686404 516724.07 1588.21 2991 3.20 144548 1498.78 311.48 361.89 23.84 115.141 148 4.12 2150 8036912.38 516726.97 1864.79 29.88 2.00 1529.28 158258 35121 409.65 26.05 30.81L 085 4.19 2131 0036960.34 516729.08 1758.88 3020 1.45 1810.82 166012 39419 45089 27.48 159.72L 0.84 4.24 21.88 8037007.27 516730.39 1854.17 28.32 35098 1093,94 1747.24 435.61 503.15 28.08 1.1R 2.11 4.31 20.10 603705384 518730.89 1950.91 32.88 0.14 177720 1830.50 47904 552.37 28.14 130.29L 4.69 040 24.59 6037103.05 516730.83 2047.04 32.37 35905 1858.17 1911.47 525.77 60018 2718 68.12L 080 045 2018 8037154.85 516730.35 2141.98 33.35 355.26 1937.93 199123 572.77 655.61 25.20 80.27L 2.40 4.51 25.94 8037208.27 516727.66 2239.10 33.55 353.31 201001 207231 02268 70890 19.88 80.041 1.12 056 2580 6037259.54 518722.21 2281.41 33.82 35281 203755 209085 83425 721.12 18.35 32.94R 177 4.57 25.93 6037271.75 516720.67 237073 34.15 353.22 2128.30 218180 89155 78180 1084 14.13L 0.58 401 2640 8037332.21 516713.02 2486.50 35.11 35280 2207.16 2280.48 742.73 83565 4.21 1361 103 465 27.39 8037380.24 516708.27 256174 35.84 352.58 228558 2338.88 795.16 890.88 -2.88 123.29L 057 4.68 27.93 603744145 516899.06 2658.81 35.04 350.98 2363.95 241725 847.77 945.87 -10.83 168.5L 1.18 072 27.49 603749842 516890.99 2754.05 31.92 34954 244338 2496.88 89793 997.65 -19.69 171.261 338 4.77 24.55 603754817 518882.00 2850.42 30.82 349.21 2525.06 2578.98 94608 1045.95 -2894 82.54L 1.16 4.80 23.50 8037597.45 516672.85 294508 3094 347.58 2607.67 2880.97 993.34 1094.99 -3881 123.340 0.88 4.83 2179 6037645.40 51886267 3041.17 30.57 348.70 268048 2742.78 1040.33 1142.83 -48.81 29.50 0.72 4.86 23.31 603709307 516852.58 313573 33.30 351.48 276072 2823.02 1088.12 1191.89 -57.37 35.13R 3.28 4.90 25.72 8037742.31 516003.89 3232.13 37.41 358.13 284034 2901.64 1140.18 124731 43.27 27820 5.09 495 2939 0037797.71 51663787 332735 40.37 358.52 2922.45 2975.75 1194.62 1307.01 -66.02 13.730 3.48 5.00 32.16 6037857.40 518834.98 • I 3424.14 4294 359.44 2904.76 304806 1252.45 1371.33 -87.16 1.278 2.73 504 34.86 8037921.70 518833.71 • 3519.23 47.25 35957 3081.88 3115.18 131171 1438.66 -87.73 3.571 4.53 5.09 3894 003798003 51863298 361208 51.28 359.25 312305 3176.35 1376.32 1509.67 -08.47 20.83L 4.29 813 42.96 6038060.03 51883208 371084 5029 357.85 3182.25 3235.55 144081 158785 -70.48 35.70 3.30 5.18 48.07 0038137.90 518629.91 380880 57.54 0.59 3238.00 3289.38 1517.93 100705 -71.51 21541 4.13 5.22 49.14 6038217.38 518628.89 390239 60.86 35894 3264.97 3338.27 1591.20 1749.09 -7187 17.55R 178 528 52.55 603829941 51862815 399842 84.05 0.08 332938 3382.68 186739 1834.22 -72.00 12.381_ 3.48 521 5887 003838053 516627.23 4004.17 67.10 358.70 338898 3422.28 174549 1921.38 -7155 82.31 3.44 535 58.79 603847168 51862607 418087 88.37 356.14 3405.23 3458.53 1828.13 2009.84 -77.55 55.571 2.81 538 80.22 6038580.13 51862188 428568 8974 354.03 3439.48 3492.78 1909.05 209898 -8822 00.218 150 542 81.73 003864924 518614.01 4381.78 70.65 35870 347104 3525.34 1992.90 2189.03 -9131 1.88R 1.89 5.45 62.53 603873028 51880872 447691 72.39 35878 350220 355850 2076.18 227990 -100.03 7.48R 183 5.48 84.26 603882921 51659880 TO-In Survey 457234 70.39 356.30 352787 3581.17 210075 2370.67 -108.38 32.870 N/A 852 88.21 6038920.88 518592.24 Too Whipstock 4800.00 7700 357.09 353010 3587.40 2185.43 2397.58 -10794 56R 815 5.53 69.36 6038947.75 51850082 Base Whipstock 4010.00 7868 359.45 3537.39 359089 2199.59 2413.23 -108.41 HS 18.00 5.55 7031 6038963.40 518590.11 Crv6/100 4830.00 78.68 35945 3541.31 3594.61 2217.15 243184 -108.80 500 000 5.55 70.31 803898101 518589.88 4700.00 81.16 243 3552.51 3005.81 2272.81 249583 -107.56 40480 6.00 5.58 7284 6039098.00 515590,78 4800.00 85.09 7.00 3564.49 3817.79 2357.22 259473 -9938 48.930 8.00 5.63 7817 6039144.90 518598.74 4900.00 8904 1152 3509.61 3822.91 2437.72 2603.25 -83.30 46.78 000 5.87 80.19 603924345 518614.59 End Cry 4938.00 9047 1115 350977 382307 2485.58 2728.41 -7561 HS 8.00 5 60 8189 603927063 518822.20 500000 90.47 13.15 358925 3622.55 251449 279073 41.06 HS 0.00 5.70 8189 603934097 518838.61 Cry 5/100 5039.60 9047 1115 350893 3621.23 2544.77 282929 -52.05 103.70 0.00 5.71 8159 603937955 516845.53 5100.00 89.75 16.08 3568.81 3622.11 2589.92 2687.73 -36.81 101719 5.00 874 80.83 803943002 518880.84 5108.43 89.65 18.49 350880 3822.16 2596.06 2895.82 -34.45 HS 5.00 874 80.73 6039448.11 51666298 5111.75 89.65 18.49 3568.88 3622.18 259847 2698.01 -3151 89.811 0.00 874 80.73 603944930 518883.92 5200.00 89.67 12.08 3589.40 3822.70 2684.78 2984.51 -11.74 89.781 5.00 518 8081 6039534.84 51888549 5300.00 8969 708 356997 362127 2745.07 3083.08 489 89.751 500 681 80.96 803983144 515701.90 0708-0411 Tot 1 5381.55 8970 400 3570.30 3623.60 2796.05 3144.33 10.83 80091 5.00 5.84 81.10 60039694.70 515707.70 540000 88.71 2.08 3570.50 382160 283024 318173 1187 89.881 5.00 585 81.19 603973110 518709.85 5500.00 8974 357.08 3570.98 3824.28 2919.65 328160 12.13 80,651 5.00 5.89 81.49 603083105 51870860 End Cry 5504.82 8974 356.85 357100 3824.30 2923.87 3287.30 11.89 HS 5.00 589 8181 8039837.88 518708.43 Cry 28/100 5503.90 8974 35685 3571.40 3624.70 3005.54 3378.45 8.98 173.981 0.00 5.91 81,51 6030926.78 516703.32 5800.00 8989 35683 3571,44 3824.74 3011.12 3382.54 8.64 173.981 2.50 591 8116 8039932.87 516702.97 0708-0411 Tot2 501165 6030 35880 3571.55 3824.85 302178 3394.17 899 176.451 150 5.91 81.07 6039904.50 516702.30 End Cry 583563 8870 35676 357107 382827 3043.72 3418.11 4.65 HS 2.50 5.92 80.47 603996043 518700.90 5700.00 88.70 356.76 3573.43 3828.73 3102.62 348138 1.01 HS 0.00 593 80.47 6040032.67 518097.12 5800.00 88.70 356.76 357560 3028.99 3194.13 3582.18 4.63 HS 0.00 595 80.47 6040132.46 51669125 Cry 3/100 5838.81 8870 356.78 357057 3829.87 322946 382072 4.81 73.351_ 000 590 80.47 004017100 518688.99 O708-0411 Tot 588167 88.90 358.10 3577.05 3830.35 3250.82 369173 4.25 73621 300 598 80.71 604019000 516687.50 End Cry 5892.16 89.16 355.22 3577.57 3830.87 3278.75 3874.12 -10.55 HS 100 597 81.03 6040224.38 51688513 590000 8018 355.22 3577.68 383098 328000 368103 -1121 HS 000 597 81.03 6040232.20 516684.48 Cry 3/100 596900 89.16 35822 357870 383200 334993 3750.74 -16.96 180.81R 000 509 81.03 604030098 516678.55 800000 88.25 355.43 357940 3032.70 337855 3781.58 -1948 188.80 100 6.00 80.11 8040331.81 518675.96 6100.00 85.33 358.12 358499 3638.29 347060 3881.14 -26.83 106.778 300 602 77.15 6040431.34 51068839 0708-0411 Tat 4 511143 85.00 358.20 3585.95 3839.15 3481.07 3892.50 -27.59 163.23R 3.00 602 78.81 6040442.70 518687.60 8200.00 8208 358.97 359563 3848.93 3501.70 308038 32.83 163.150 3.00 605 7023 6040530.56 51688256 End Cry 6239.78 81.31 357.32 3601.24 305054 3597.87 4019.88 -34.79 HS 3.00 6.06 73.07 6040560.86 516860.11 830000 81.31 357.32 361033 3883.83 365194 4079.17 37.57 HS 0.00 6.06 7107 6040029.33 51885720 Cry 3.5/100 8312.11 81.31 357.32 361118 3885.48 3882.85 4091.13 -38.13 18.790 000 607 73.07 6040641.29 516658.61 O708-0411 Tat 5 8302.95 8300 357.90 361910 367240 370885 4141.45 -40.23 19.22R 3.50 6.08 74.72 6040091.60 51665440 6400.00 8422 358.33 362122 3878.52 374199 417825 41.44 19.170 3.50 6.00 75.91 004072830 51885111 850000 8753 35948 383041 368171 383170 4277.96 -4135 10.090 150 6.11 7915 6040828.08 51665098 End Cry 6524.11 88.33 35078 363128 3884.58 385324 4302.05 43.61 HS 3.50 8.12 7993 0040852.17 518650.78 Cry 3/100 856027 88.33 35978 3632.33 388583 3885.52 4338.19 -43.88 121.680 0.00 6.13 70.93 6040888.31 558654553 660000 8770 077 383171 368701 3920.82 437790 43.48 121.85R 3.00 014 7925 6040028.02 516050.82 0708-0411 Tot6 661290 87.50 1.10 3634.25 388785 393220 4390.78 43.27 120.270 3.00 6.14 79.03 6040041100 518850.80 End Cry 6652.15 8691 2.12 3830.16 368940 396602 4429.97 42.17 HS 3.00 6.15 7819 604008008 516851.81 670000 88.91 2.11 3638.75 369205 400817 4477.72 -40.40 HS 0.00 8.15 78.39 004102783 510053.47 680000 8891 2.12 3644.14 389744 409561 457781 38.71 H5 0.00 6.17 7819 604112702 516858.04 Cry 3/100 685402 86.91 2.12 3647.06 3700.36 0142.74 4831.42 -34.72 130.890 000 6.18 7819 6041181.53 518858.81 0708-041_1 Tot? 6062.02 8815 2.30 3647.50 370080 414971 4639.30 34.41 100.98R 300 6.18 78.23 6041189.50 516659.10 End Cry 687798 86.88 2.77 3898.42 3701.72 4163.58 4855.31 3171 45 300 6.18 7811 0041205.42 51685977 6900.00 88.68 2.77 304970 370100 418166 407727 -3264 HS 000 8.19 78.11 604122738 516060.78 700000 86.88 177 385853 3708.83 4160.32 4776.08 -27.82 05 0.00 6.20 7811 604132709 51868838 Cry 3.5/100 7032.01 88.88 277 3057.30 3710.69 4297.08 4808.90 -28.27 83.051_ 0.00 8.21 78.11 604135901 516666.86 7100.00 86.95 0.41 380158 371048 4350.67 487875 -24.39 82.021_ 3.50 6.22 78.52 604142688 518888.58 O708-041_1 Tot 8 711188 87.00 0.00 3601.80 3715.10 438703 4888.39 -2435 80.011 150 8.22 78.59 6041438.50 51060860 720000 87.49 358.94 3080.05 371935 4448.69 497859 -26.70 80.761 380 6.24 7926 604152668 518686.05 End Cry 720337 87.51 356.83 3608.10 371049 444976 4979.95 -26.89 HS 380 6.25 7928 0041530.04 51688588 Cry 35/100 728292 87.51 358.83 3868.78 3722.08 450019 503936 -30.18 81.951 0.00 6.25 7928 604158943 516882.43 rl.Uli....6-sm....•)0 4 400 n NNLoit,k..n\/ll.LBnL Dnin8(1DAR11AV"DAR11A1 11(1Df1R11AI 1 (D11 FM/9/111 1/1•00 ARA Pones 1 of 0 Pal us operating WELL OP08-04 L1 Drilling Procedure OP08-04 L1 Oliktok Point Conductor slot #08 Reservoir location #04 Producer (Schrader Bluff) Nikaitchuq Project — .....w., en o• GIs ©perr hnng . WELL OP08-04 L1 Oliktok Point Nikaitchuq Field eli petroleum OP08-0411 North Slope - Alaska DIR/LWD DEPTH I HOLE CASING MUD IW O MWD FORM MD I TVD SIZE SPECS INFO Cement to Surface 20" Hole Angle X-65 0° 20"Conductor Shoe 160' 160' Driven Welded N/A M 0 Surface CSO 13-3/8" 68# MW(ppg) Wellbore Stability 1- L-80,BTC 8.8-9.5 Lost Circulation Hole Cleaning Casing Sections Casing Wear r ro N E a N m Hole Angle o 34.00 Deg 133/8°CSG 2,333' 2,150' 16" 50°F WBM GR/RES/PWD Inter.Casing Wellbore Stability 9-5/8" Lost Circulation Xceed 900 47# MW(ppg) Hole Cleaning L-80,Hydril 563 8.8-9.5 Torque&Drag Casing Sections Casing Wear 4-: BHA Expense Intermediate TOC —1 Pick-up Top of Sand V N O 1 N Top 4,192' 3,460' 1O rg o0 m ICY: 0 ' TOL 4400' 3525' n Hole Angle 9 5/8"Window 4,600' 3,591' n / 76.00 Deg 9 5/8"csg 4999' 3629' 12.25" 85°F WBM 'l GR/RES I I ,r ADN/PeriSCOPE El ® Wellbore Stability K' I I Lost Circulation EJ I I dotted un°r Hole Cleaning I I 5-1/2" Torque&Drag °—° 15.5# MW(ppg) Casing Sections E Xceed 675 I I 1-80,Hydril 521 8.7-9.4 Casing Wear m I I BHA Expense I I isi I I D Hole Angle 90.00 Deg 5 1/2"Liner 11,350' 3,761' a ci ` i 8 1/2" 85°F MOBM us operating WELL OP08-04 L1 Table of Contents WELL PLAN SUMMARY 4 WELL HISTORY 6 DE-COMPLETION SECTION 7 RIH WHIPSTOCK AND 9 5/8" MILLING OPERATIONS 8 Pick Up Production Drilling Assembly 10 PRODUCTION SECTION 11 Production Drilling 13 Production Liner 14 ATTACHMENTS 17 Recommended Drilling Practices 18 Health, Safety& Environment 19 Safety Meeting Topics 20 Well Shut In Procedure While Running Production Tubing 22 Conductor Broach—Contingency Cementing Plan 23 TAM PORT COLLAR Utilization Decision Tree 24 p us i.peraLing WELL OP08-04 L1 WELL PLAN SUMMARY Rig: Nabors 245 Type of Well: Producer Well Design: 13-3/8"Surface x 9-5/8"Intermediate x 5-1/2"Liner Close Approach and Offset Well Interception Risks It is important to stay as close as practical to the planned directional program. The directional program and a summary of close approaches can be found in the attachments. These close approaches will be in conformance with the minimum well separation criteria detailed by the Drilling Anti-Collision Analysis and Close Approach Guidelines. It is the responsibility of the Directional Driller and the Drilling Supervisor to ensure that the directional plan is executed as planned,that the position of the well as it is drilled is monitored on an anti-collision diagram and that no tolerance line for close approach wells is crossed. It is important that the well bore remains close to the planned well path as any major deviations from the profile may adversely affect the ability to drill future wells and still adhere to the current close crossing guidelines. Survey Program& Procedures Take MWD surveys as frequently as needed,but no less than every 100 ft. Carefully review the anticipated close crossings with existing wellbores and future well paths. Make sure that directional drillers are aware of all drilling close crossing issues,hard lines and no-go lines. If a no-go or hard line has been or will be crossed,stop drilling immediately and contact the Drilling Superintendent to discuss options. Mud Logging Program Mudlogging will be utilized from spud to production hole TD. Refer to the Geological Mud Logging Procedure document. ft 9 7 r eat us operating WELL OP08-04 L1 OBJECTIVES: 1. Drill the well at or under AFE cost and time. Perform work in a safe and professional manner meeting all ENI Petroleum Health, Safety, and Environmental requirements. 2. Cut window in the 9 5/8" casing and drill 2nd lateral per the well plan. Maximum dogleg severity in the landing shall be no greater than 3.5°/100' DLS. 3.Land Intermediate casing point within 100' radius of the planned directional target. 4. Execute the setting and orientation of the whipstock per the wellplan. 5. Target Greater than 90%within the OA sand Reservoir. 6. 8-1/2" hole LWD Failure Requirements: GR/Res/Dir/PWD— Require GR/Res/Dir to achieve TD. Vti ilt 5 us operating WELL OP08-04 L1 I WELL HISTORY PTD#:211-127 Current Status Well OP08-04 is currently shut in and waiting for rig to workover failed completion and drill second lateral. Scope of Work Scope of this workover is to pull the current TTC-ESP tubing completion,rih and set a retrievable whipstock , mill a window in the 9 5/8" casing , drill a new 8 %2" lateral section, rih a second 5 %2" slotted liner and run in with a new TTC-ESP system to have a commingle prodaction for both lateral. General Well info Reservoir Pressure/TVD: The ESP downhole gauge are still functioning and reading 1466 psi at 4417'MD/3,537'TVD on April 10th. Reservoir depth is 4999'MD/3629'TVD. This well is expected to have a static max bottom hole pressure of approximately 1600 psi during the time of workover, which places the fluid level well below surface. Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi BOP configuration: Annular/pipe/blind/Flowcross/pipe • en II us operakinnc WELL OP08-04 L1 DE-COMPLETION SECTION Procedure: 1. MIRU Nabors 245. 2. Shear lower GLM valve and circulate 9.1 ppg hot water with 3 %KCl kill fluid through tree. 3. Set BPV. ND tree and NU BOP and test to 3500 psi. 4. Pull tubing to lower GLM. Rig up wireline and pull tubing stop check valve. 5. Circulate out remaining production fluid. 6. Continue POOH and lay down ESP assembly. I/ Below the current schematic of the well: I I Petroleum Vacuum Insulated Tubing(VIT),4-W x 5-'W, Ed approx 80',two joints OP08-04 C Oil Producer with 4-W 12.6 ppf Production Tubing ESP Lift 4-W cable damps,for ESP Power As Completed Cable,(1)3/8"Chem In)Line 7/12/10 4.213'MD.3,467'TVD,68.7°Inc.-GLM,KBMG. 444'x1",with 2,000 psi STS-1 SOV installed 4.417 MD,3.537'TVD,71'Inc..1.8°DLS-Bottom of Motor Centralizer Surf-Casing \ Centrilift TTC-ESP,62-stage 380P18 pump,513 GSB3DB tandem seals,126 HP MSP 19-919',68 M motor 2.334 MD. 2.151 TVD 7 340 Inc. \ � 4.792'MD,Baker SLXP /j Liner HangerrPacker HAL Zonal Isolation 5-1 -Silver Bullet Ecc Swell Packers Nose Guide Shoe . /... + Intern) a.,n Slotted Liner 17 ppf 4.999'MD.3._629'TVD 11.113'MD. 85-Inc 3.726'TVD 98'Inc. Nikaitchuo Field- - .',r7v"_1;i:_I v:. I et 11 us operating WELL OP08-04 L1 RIH WHIPSTOCK AND 9 5/8" MILLING OPERATIONS 1. RIH with a clean out BHA to the top of the liner 4792'MD 2. Displace a well to LSND mud Mill a window in 9 5/8"47#casing. Notes: a) It is important that the whipstock assembly be spaced out to ensure that the entire window is milled between casing collars. b) The approximate overall length of the casing window to be milled is 14'-16' ft. c) All measurement and procedures are to be double-checked and approved by Co.Man prior to running the whipstock/window milling assembly in the hole. ✓ d) Ensure drill pipe pup joints are available for the correct space out e) After the window is milled,the upper watermelon mill should be gauged.If the upper watermelon mill is more that 1/8"under gauge a cleanup trip is recommended to ensure window is fully open.A back up set of mills should be on location. 0 Ditch magnets should be placed in the flow line to recover all metal circulated out of the well Whipstock/Window Milling Guidelines: D Check with Geologist to confirm if there is a concretion at the window milling depth. D Never rotate a bit on the face of the whipstock D Orient the BHA(if motor is used)above the window before attempting to exit the window.Bit rotation may "catch"the edge of the whipstock and damage the face making recovery operations more difficult. D If at any time during operations a problem is encountered tripping through the window area,a watermelon or string mill should be run in the drilling assembly to clean up the window area D Always trip slowly and carefully(+/-90 seconds per stand)with all BHA's through the milled window • .- us ®per&tiing WELL OP08-04 L1 Procedure: 1. Prior to mill the window, hold a Tech Planning meeting to discuss this phase of the well. Review the well plan and discuss any discrepancies or concerns with the drilling superintendent 2. RIH the whipstock assembly 3. At surface align the MWD with the whipstock face 4. Shallow test the MWD tools 5. RIH to setting depth 6. 45' above setting depth establish circulation and work torque out of string. 7. Orient the whipstock as per well plan.Once the correct orientation is confirmed,reciprocate the whipstock to confirm that the face has not rotated.Re-check the orientation with an additional survey. 8. Once orientation and depth have been agreed upon by all relevant parties,set the whipstock assembly. 9. Initiate circulation and obtain a survey of the installed whipstock orientation 10. Start 9 5/8"casing milling operation.Establish rotation to begin milling the window. 11. After the window is complete and before POOH,shut pumps and work milling assembly through window several times watching for drag.POOH and L/D milling assembly. YE 411Ir 2rn1� us operating WELL OP08-04 L1 Pick Up Production Drilling Assembly 1. PU the 8-1/2"bit and the BHA assembly as per the BHA diagram. ➢ 8-1/2"PDC ➢ Rotary Steerable > Flow rate: 550 GPM > 120-140 RPM Oil Based Mud Fluid Displacement 2. Displace casing to new Oil Based Reservoir Drilling Fluid ➢ Do not contaminate new OBM in rig pits 3. Drill 20'-50' of new hole usin¢the Oil Based Reservoir Drill-In fluid. 4. Perform Leak Off Test as per AOGCC requirements following the attached LOT Procedure. > PU into casing and perform LOT. > If the pressure continues to rise past 12.5 ppg EMW,shut down and call it a FIT per the FIT Guidelines (attached). > If LOT is unacceptable to drill ahead(less than 12.0 ppg EMW),contact Drilling Superintendent to discuss options. > Do not pump more than 1/2 bbl after leak off is determined. There is no need to pump more than 1/2 bbl into the leak off and extend the fracture. > Plot on LOT form in N drive Iv* 2no• operafnng WELL OP08-04 L1 PRODUCTION SECTION Surface Formation Markers: (all depths Nabors 245: Schlumberger Plan (I) True Formation Tops Measured Vertical Comments Depth, ft Depth, ft SV-4 720 718 SV-3 1029 968 SV-2 1245 1171 B/Permafrost 1600 1570 SV-1 1821 1715 Ugnu Top(UG4) 2192 2022 13-3/8" Csg 2333 2150 In Place UG-2 Coal Bed Marker 2759 2492 Lower Ugnu 3612 3173 Schrader Bluff Top 3971 3377 N Sequence Top 4232 3477 N Bottom 4376 3522 Window(M - 4 600 ' V 9 5/8" Shoe 4999 3629 In Place 0P08-04L1 tgtl 5362 3624 0P08-04L1 tgt4 6111 3639 0P08-04L1 tgt7 6862 3701 0P08-04L1 tgt10 7612 3730 0P08-04L1 tgt13 8362 3763 0P08-04L1 tgt16 9112 3772 0P08-04L1 tgt19 9862 3747 0P08-04L1 tgt22 10612 3741 TD 11350 3761 Total Depth 2x10 us °perairing WELL OP08-04 L1 Production Mud Program: FazePro Density HTHP FL Electrical Interval (PPg) YP (mU30min) Oil:water Stability mlVolts Production 9.4 14-20 <5.0 65:35 >600 Production Logging/Formation Evaluation Program: Production: MWD Directional/PWD(Pressure While Drilling) LWD GR/Res/ADN/PeriSCOPE Production Drill Pipe Tool Joint Body DP Tool Make Pipe WT Grade Conn. Joint Joint Body Torque Torsion Torsional capacity Capacity (pp/) type OD ID(in) al Yield Yield w/corm. (in) ID(in) (ft.lbs (ft lbs) (ft.lbs) (gal/ft) (fps) DP 19.5 S-135 TT525 6.50 3.875 4.276 49,600 82,700 74,100 .731 712 Production Section Notes: a. Monitor hole conditions carefully. Be alert for early signs of lost circulation and differential sticking. If any of these problems are observed immediately notify the Drilling Supervisor or Toolpusher(attempt to keep the pipe moving and circulation established). Ensure that all team members are communicating with each other on any observed drilling trends and that everyone understands the potential risks. b. Shallow test MWD tools. c. Good drilling and tripping practices are vital for avoidance of differential sticking. Make every effort to keep the drill string moving whenever possible and avoid stopping with the BHA across the sand for any extended period of time. d. Keep shut down times to a minimum during connections. When surveying in this hole section reciprocate the pipe slowly while the survey is transmitted uphole. Keep the pipe rotating whenever possible. e. Ensure the Top Drive Torque Limit is set below the lowest make up torque in the string. Do not run the risk of further make up to a connection while drilling. Openhole Sidetracking Practices: f. Lowside in a fast drilling interval where the wellbore is heading up and where the ABI's show a good build rate. g. Orient within 15 degrees either side of lowside and trough with high rotary RPM's while reciprocating from the kickoff point back to the first stabilizer. Trough for approximately 30 minutes. h. Time drill at 4 to 6 feet per hour with high flow rates and rotary RPM's for the first 5 feet. Gradually increase the penetration rate as the openhole sidetrack is achieved. i. If any openhole sidetracks are drilled,confer with Drilling Supt.and consider tripping without circulating or without rotating past the sidetrack point. 10* 2rno us operrfing WELL OP08-04 L1 Production Drilling 1. Directionally drill the 8-3/4"hole to TD. ➢ Geosteering will be required to remain in the target boundary 100%of the time ➢ Maintain sufficient flow rate with maximum pipe rotation as needed to bring mud/well properties in line. ➢ Maintain proper Calcium Carbonate concentration per MI mud plan. • Ensure Centrifuges are operating effectively to remove fine drill solids 2. Backream at TD: ➢ At TD circulate 50%of calculated TAD cleanup cycle pulling 1 stand per bottoms up. Once the first 50% cleanup cycle is completed circulate the remaining 50%of the calculated cleanup cycle pulling 2 stands per bottoms up. Decrease backreaming speed as torque and pump pressure dictate. • 550 GPM • 120-140 RPM ➢ Backream into the intermediate casing shoe. • 550 GPM • 120-140 RPM • Slow backreaming speed when pulling BHA into the Intermediate casing shoe/rathole. Hold parameters steady at 550 GPM and 120 RPM. • Decrease backreaming speed as torque and pump pressure dictate • NOTE: once backreaming in the open hole has been started, do not stop backreaming. Do not attempt to pull out on elevators once backreaming has started. 3. Drop rabbit down drill string once bit is above the intermediate shoe: the SLM of landing string portion of the tapered DP • Drift OD dependent on Completion • COMPLETION DP RABBIT SIZE: 2-3/8" OD • All drifting tools will be accounted for and held in one place at all times. 4. Continue backreamin2 until depth at which it is possible to pull out on elevators at>9.1 swab EMW at 2.5 min/stand • 550 GPM • 120-140 RPM • Determine depth at which swab can be kept>9.1 EMW at 2.5 min/stand as per K&M TAD Model. 5. Circulate until shakers are clean as per K&M. • 550 GPM • 120-140 RPM 6. Slug DP and trip out of hole on elevators. ➢ Utilize K&M's swab model to control trip speed and avoid swabbing the open hole below 9.1 ppg EMW. $0* r1 us operati nng WELL OP08-04 L1 7. Lay down BHA ➢ When out of hole,down load the recorded tool data and send to the Geologist in town 8. Rih with retrieving tool assembly to retrieve the whipstock assembly Production Liner Completion DP RABBIT SIZE Will BE: 2-3/8" OD Production Liner OD Conn. Cplg OD Collapse Burst Tensile Yield (in) WT(ppf) Grade Type (in) ID(in) Drift(in) (psi) (psi) (kips) 5-1/2 15.5 L-80 HSZI 5.713 4.950 4.825 4990 7000 242 Production Liner Connection Make Up Torque (ft-lbs) Mm. Target Max. OD WT Grade Conn. Type Make Up Make Up Make Up Yield (in) (pp) Torque, ft- Torque Torque* Torque lbs 5-1/2 15.5 L-80 Hydril 521 4600 8100 N/A 24,000 * See attached TenarisHydril Guidelines for make-up torque recommendations Production Liner Centralization From To Quantity/Joint Fixed/Floating Type Shoe Liner 1/joint Fixed 5-1/2"x 7" top -Mid joint -Crimped on -Hydroform,Volant(Crimp on) Liner Running Procedure Notes: • Ensure proper crossover from DP to slotted liner is on the rig floor in case of a well control situation. • Liner top should be placed a minimum of 200 ft above the intermediate casing shoe. • Ensure accurate torque and drag data is gathered. Record pick up and slack off weights every stand and free rotating torque every five stands. Data gathered will assist in future liner running operations throughout the project. • Perform visual inspection,measure and caliper all components prior to running any assembly in the hole. Ensure accurate dimensional data is recorded for all equipment run in the well and recorded in WellView. • Ensure all equipment has been hydraulically and operationally tested. Also ensure all equipment to be run is dimensionally compatible with all other equipment. • Review all setting operations and shear pressures with Baker Oil Tools service hand. • Ensure that all workstring components have been rabbited as ball will be dropped to actuate downhole tools.Rabbit DP on last trip out of prior to running liner. co* e n1 us operrahns WELL OP08-04 L1 • If any openhole sidetracks have been drilled,monitor sidetrack depths during run in and ensure shoe enters the correct hole. • DO NOT run E-CD subs on drill pipe while running liner string. • Torque ratings for string components: String Components Yield Torque(ft-lb) 5" 19.5#TT525 Drill Pipe 74,100 HRD Running Tool 40,000 7"29#Hydril 563 39,000 5-1/2" 15.5#Hydril 521 24,000 • Shear pressures for liner hanger assembly: Item Description Shear Value Shear Range HRD Running Tool,7" Nominal- 3192 psi 15%+ 3671 psi 6795 mch rel,3 pins 15%- 2713 psi Pusher Tool Activation Nominal- 1986 psi 15%+ 2284 psi 15%- 1688 psi Pusher Tool Neutrlz. Nominal- 3588 psi 15%+ 4126 psi 15%- 3050 psi Ball Seat SOLID *****Make-up torque for liner hanger sub-assembly,including running tool connections,should be torqued to 14,000 ft-lbs prior to deliver to rig. Procedure: 1. Hold Pre job safety meeting to ensure all parties understand operation 2. PU the Liner Assembly and Running/Inner String as outlined above. 3. RIH with Liner Assembly. Record PU and SO weights as required. 4. Pick up liner hanger assembly and make up to proper torque. Fill Liner Tieback Sleeve with"pal mix" and ensure mixture is thin enough to travel past the HRD tool and down to the packoff. Wait 30 minutes for mixture to set up. 5. Trip in hole one stand and circulate 5 bbls to ensure all flow paths are free. Record ROTATE,PU and SO of liner assembly. 6. RIH in hole to casing shoe with DP. RIH with Liner Assembly as hole conditions allow,but do not exceed running speed of one stand per minute. Break circulation and fill DP as necessary. 7. Monitor mud flow while running in open hole and slow running speed if necessary. Circulate minimum of one DP volume and record ROTATE,PU and SO weights. 8. Record PU, SO, and Rotating torque in open hole every 500' to ensure friction factors are sufficient to run the liner to bottom successfully. If friction trend indicates liner will not go to bottom then call Drilling Supt.immediately. 9. Rotating liner 20-60 RPM will be necessary to run to bottom. 10. Continue RIH with Liner Assembly to proper setting depth. Liner should be spaced out to locate the liner top approximately 200 feet above 9-5/8"window. 2rn1ll us operahns WELL OP08-04 L1 11. Trip slightly deeper than desired liner top location with liner top. Last motion of the liner should be up to ensure it is set in tension. Ensure Liner Hanger assembly does not exit 9-5/8" Window. 12. Prior to setting the hanger&packer,double check all pipe tallies and record amount of drill pipe on location. 13. Rig up to pump down workstring with rig pumps. Pressure test lines. Bleed off test pressure. 14. Drop setting ball down the workstring and pump slowly(1 2 bpm). Slow pump before the ball seats. Do not allow ball to slam into ball seat. 15. Pressure up to 3000 psi and hold for 5-15 minutes to set SLZXP hanger packer. Continue pressuring up in 500 psi increments holding for 5 minutes each up to 4000 psi. 16. Packer can now be pressure tested. Bleed DP pressure to zero,close annular preventer and test annulus to 1,500 psi for 10 minutes and chart. 17. Bleed off pressure and pickup to verify that the HRD running tool has released. If packer did not test, rotating dog sub can be used to set packer. If running tool cannot be hydraulically released, 6,795 ft-lbs of left hand torque can mechanically release the tool. 18. Once running tool is free and packer is tested,Displace mud from liner top to surface with 9.0 ppg KC1 brine per MI recommended program. 19. POOH and LD and inspect the liner running tools. 10* 2nn us operating WELL O P08-04 L 1 ATTACHMENTS 1. Recommended Drilling Practices 2. Health,Safety,and Environment 3. Safety Meeting Topics 4. Well Shut In Procedure While Running Tubing 5. Conductor Broaching Contingency Plan 6. Port Collar Decision Tree 2n� us operating WELL OP08-04 L1 Recommended Drilling Practices Hole Cleaning With a deviated well path and potential for losses,hole cleaning will require special practices. Pipe rotation is critical for effective hole cleaning. The maximum string RPM,as determined by the BHA,is specified for each hole section in the detailed procedures. The shakers should be monitored as an indicator of adequate circulating time. If circulation is of long duration,then pipe movement to prevent casing wear is critical and a stand should be laid down occasionally to prevent excess hole erosion over the length of pipe reciprocation. In addition the following practices should be employed at all times: a) Use all available solids control equipment to keep mud as clean as possible. b) Emphasize proper hole cleaning after slides by rotating at maximum allowable RPM c) As the hole angle increases,hole cleaning practices must be altered. Maximum pipe rotating speeds along with maximum achievable flow rates will increase hole cleaning efficiencies. Circulating times prior to trips should be increased accordingly to account for longer times required to remove cuttings from higher angle wells. d) Use good connection practices while drilling. After reaching the bottom of a stand,allow a small amount of circulating time to allow cuttings to get above the BHA prior to picking up off bottom. Be sure to pick up slowly to prevent packing off the cuttings bed around the top of the drill collars. Slower Trip/Connection Speeds High POOH and RIH speeds can aggravate fragile shales/formations due to the pressure variations between surge/swab. PWD data shows that excessive tripping and reaming speeds can exert pressure spikes in excess of 2 ppg equivalent. Effective ROP Strive to find the maximum effective rate of penetration.That is,the maximum rate at which a clean hole can be produced. While on bottom ROPs in excess of 400 fph may be possible,but such ROPs may load a high angle hole with cuttings that are not being removed fast enough. Using torque and drag trends,ECD and the shakers,establish a base line clean hole ROP,and then try to improve it by altering the hole cleaning practices. Slower Initial Pump Rates PWD data has shown that the most significant period for increased ECD occurs when the pumps are brought on at drilling rate while washing a connection to bottom. The study also concluded the least damaging procedure is if pump rates are held at 40%or less of drilling rate while reaming connections. _ • en us operr1Cnnc WELL OP08-04 L1 Health, Safety & Environment The following are part of the mitigation&contingency measures to be put in place in order to complete this project while helping to meet our HS&E goals. It is the Drilling Supervisor's responsibility that these measures are implemented and communicated to the relevant parties on location. Good communication when drilling is essential for increasing the safety of personnel and equipment. H2S Contingency Measures Assume all locations have the potential for H2S. 1. The AOGCC will be notified within 24 hours if H2S is encountered in excess of 20 ppm during drilling operations. 2. The rig will have fully functioning automatic H2S detection equipment meeting the requirements of 20 AAC 25.066. Manual detectors in accordance with 20 AAC 25.065 will also be maintained on location. 3. Self-contained Breathing Apparatus for all rig personnel will be maintained on location. 4. All personnel engaged in the drilling operation will be trained in H2S emergency procedures and the use of proper personal protective equipment. 5. A standard H2S contingency plan will be posted at the rig. All rig personnel should read and familiarize themselves with this document and copies should be posted in the rig floor doghouse and in the camp on location. 6. H2S treating material for the drilling mud system will be available on location in the event that any H2S is encountered. It is expected that the rig and personnel will have the equipment and training to identify and contain a H2S emergency situation. If it becomes necessary to notify the AOGCC of an H,S encounter,drilling will be suspended and will resume only after the development of detailed remedial and contingency procedures,full compliance with 20 AAC 25.065 and the applicable referenced sections of API RP49 and approval of the AOGCC. Lessons Learned Documentation of lessons learned has been proven to reduce downtime and increase efficiency of rig operations. It is expected that planning meetings,daily operations meetings and pre-tour meetings will be held on a regular and consistent basis and that the records of those meetings will be placed on the N drive in the appropriate folder for this well. 2rr11 CIS operr wing WELL OP08-04 L1 Safety Meeting Topics Move In, Rig Up ✓ Prior to spud,a safety meeting should be held with the rig crews to discuss open hole drilling procedures. - Subsidence around wellheads-use of buddy system, - Conductor broaching operations and contingencies, - Shallow gas hydrate drilling practices, - Proper tripping practices and hole fill calculations with various sizes of pipe and tubing, - Well control procedures, - Flow rates and hole cleaning,and - Diverter operation and crew responsibilities. > A Diverting Shallow Gas'drill should be held with rig crews prior to spud,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. ➢ An'Accumulator'drill should be held with rig crews prior to spud. Document drill and record on morning report. > Shut-in drills should be held on a regularly scheduled basis. A suggested minimum is once per day on alternating tours. Document and record on morning report. > Check trip tank for leaks and confirm gauges are calibrated. Complete trip sheets and submit to the Drilling Supervisor after each trip. > Perform and document all drills. ➢ Designate crew member to control access at the pad entrance in case of diverter operation. Surface > A'Stripping'drill should be held with rig crews prior to drill out,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. > A'Well Kill'drill should be held with rig crews prior to drill out,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. > A well kill sheet shall be posted in the doghouse and updated each tour. Intermediate > Prior to picking up the BHA a safety meeting should be held with the rig crews to discuss hole risks and open hole drilling procedures. ➢ Potential formation pressures and mud weight,Well control procedures. > Hole cleaning best practices,flow rates. ➢ Stuck pipe,Lost circulation. > Proper tripping practices and hole fill calculations with various sizes of pipe and tubing. Production > Prior to picking up the BHA a safety meeting should be held with the rig crews to discuss production hole risks and open hole drilling procedures. ➢ Potential formation pressures and mud weight,Well control procedures. ➢ Hole cleaning best practices,flow rates. ➢ Stuck pipe,Lost circulation. of- 2r111 us operating WELL OP08-04 L1 ➢ Proper tripping practices and hole fill calculations with various sizes of pipe and tubing. Completion ➢ Operation of the control line spooler. ➢ Pinch points associated with tongs and slips. ➢ Proper tripping practices and hole fill calculations with tubing and control line. ➢ Well control practices while running production tubing with control line. ➢ Pressure testing and minimizing personnel exposure to pressurized lines. • ft • e us operarnng WELL OP08-04 L1 Well Shut In Procedure While Running Production Tubing If well is suspected to be flowing: 1. Install TIW valve and pull back to the first banding point below the BOP stack. 2. Shut off air to control line spool and bleed off line pressure while checking well for flow. 3. If well is confirmed to be flowing,cut control line with bolt cutters directly above a banding point. 4. Slack off until full joint of pipe with no control line attached is spaced out across BOP stack. 5. Close annular and monitor pressure. If well is coming in rapidly and time is not permitted to complete above operations: 1. Install TIW and close annular around pipe and control line. 2. Shut off air to control line spool and bleed off line pressure while picking up a joint of drill pipe and making it up to TIW and top drive. 3. Close IBOP on top drive and open TIW valve. 4. Cut control line and strip the joint of drill pipe across stack for ram closure if needed. 5. If annular does not seal off around tubing and control line and the joint of drill pipe cannot be safely picked up, close blind/shear rams on production tubing. Notes: • Specify location of bolt cutters required to cut control line. • Need to have access to a joint of drill pipe and the appropriately sized elevators at all times. enll us operrahns WELL OP08-04 L1 Conductor Broach— Contingency Cementing Plan In the event of a broach to surface of drilling fluids during the drilling of the surface interval, the following contingency plan is recommended to remediate the situation. Conductor Hole Diameter Conductor Casing Size 20" Conductor Setting Depth +/- 120'MD DP/Conductor Annular Volume 5"DP x 18.25"ID: (36 bbls) Conductor Pipe Volume 39 bbls 16"Open Hole Capacity 0.2487 bbls/ft 1. Upon establishing that a broach of the conductor casing has occurred,POOH and stand back BHA. 2. RIH with open-ended drill pipe to 20'below the base of the conductor pipe. 3. Establish circulation with mud at normal drilling rate. Begin circulating and establish rate of flow through broach with drilling fluid. 4. Circulate up to 120 bbls of water or until water returns are seen from the broach. 5. RIH to 200'below the base of the conductor. If mud viscosity is<300sec/qt.,spot a 150'pill of 150K cp polymer (Biozan)to 50'below the conductor. POOH to 20' inside the conductor. 6. Mix and displace+/-80 bbls of Artic Set 1 cement at 15.8 ppg. Cement may U-tube with no ability to obtain squeeze. Do not over displace DP. Monitor and gauge all returns. 7. POOH and WOC for 8 hours. 8. PU 16"bit and BHA and RIH to clean out cement to 40'below conductor. Establish normal circulating rate and evaluate broaching. If no broaching is seen,continue with planned operations. If additional broaching occurs, repeat steps 6,7 and 8. II • 2rnlll us operaCllns WELL OP08-04 L1 TAM PORT COLLAR Utilization Decision Tree TAM Port Collar Utilization Decision Tree Begin Primary One Stage Cement Job No Cement Cement to to Surface Surface Drilling Foreman and � " Nipple Up and Engineer determine the / — Test BOP'S Top of Cement Top of Top of Cement Cement : Continue wi above Port below Po Completion; Collar Collar (1000'TVD) (1000'TVD) • X Indicators of Cement Top Perform Top Job as per ---------------------------► Open Port Collar If Top Job is ineffective or 1. Observation of Tracers in Spacer ahead of lead cement requirements of using drillpipe 2. Calculated Displacement AOGCC unacceptable to AOGCC P 3. Displacement Pressures during Primary Cement Job 4. Other indications that cement is near surface Nipple Up and Circulate Cement Test BOP's to Surface and close Dort Collar Continue with fipple Up and Completion Test BOP'S Continue with Completion Dr Ling Hazards Summary 8-3/4" Open Hole / 4-1/2" Liner Interval Hazard Risk Level Mitigation Strategy Abnormal Reservoir Low Stripping drills, shut-in drills, increased mud Pressure weight. Stuck Pipe Low Good hole cleaning, PWD tools, hole opener runs, decreased mud weight Lost Circulation Low Reduced pump rates, mud rheology, LCM Hole Swabbing on Trips Moderate Trip speeds, proper hole filling (use of trip sheets),pumping out, backreaming Drillina Hazards Summary.doc . a b ����ggg`'''p�ggggg g g_ Ei vii 1 iii a Z 'in- cl.. o2 Y� Jg02 yLu02 p d en m���11ZZ WZ O LL_CZZ WZ k 41 i m ® i ��1OJ �JJ �NZJ °jWZJ 'mob Z W W N O - Z 1 Z U !! J z �?Z��� P.-),_,0 �� W ���� 2 Lc) 2 rn� 2 W N m 1 I I I - e} N P IN 3J -,1 it 3` o� a...c p = Z _ e oaW r u- L, ›. co o W W Y 1 U 1A Iv — � — — I � �, \ I w Z it O _. \ I\ a a u J I L- 0 CC- - - + Na /, n i E-7 7 i �_ °a\o O ` � / �� QNV A a C.) - - - 1I H A o H d CCI W 3 Q Z 3 J O U Y o a co 0 U 0, U V-U I a a :iih W ; Ellinninl, I. I:___ CC CC W cc 0 W H_d y nm nm W~ d Q Y T T HI L■I... n i�d �� F- 8� .I ® F�— r Q o E Fs w In n U ° 3 'ilrf N$\ H 8 EV Y 8 p� z S iiii v o , c, - Q Y l �-� N w V j- 0 co U • • MI: \ g Q .14INN N ikb W gag. n .+/l.-.B N tikillill P N O gum iO Il e . 9 ..„„„.„.. 0 O e \ AP 9 t I 1 Ual i. Lt) CNI Q I 0 I ( i ft k ' 0.) adititakiiiii, ,, > > N ¶ t0@ et c ? : a) . v - t C '' ms 76 7,5 —3 - \ \ ,, .ter p d L L La ;' Co as N Co N CO cn 0 0 0 - o y E E E co ;v (13 •J 0 0 0 ' k e; ar o 0 0o , in va C. a) cn ' M '� cD c0 Zr) ifl 2 L W T T T T �'/ 0 0 \ 0) 0 4 N 4 M O m t 4 Q 0 _ Ti = ct5 CC CD 1E o m N U 5Z cr Z , T r Q c0 -� T ® ,..): 0 S P E O IDENTIFICATION CODE PAG 206 OF 338 r ENI S.p.A. Gail E&P Division REVISION ST,AP-P-1-M-6140 0 1 1 15. LEAK OFF TEST PROCEDURE A Leak-Off Test (LOT) will be performed On Wild-Cat wells at each casing shoe after setting the surface casing. LOTs are also recommended to be carried out on both appraisal and development wells. Leak Off Test and Formation Integrity Test (FIT), also termed the Limit Test, are for formation strength pressure tests made just below the casing seat prior to drilling ahead. These tests are carried out to: • Investigate the cement seal around the casing shoe which should be at least as high as the predicted fracture pressure for the area. • Investigate the wellbore capability to withstand pressures below the casing shoe in order to allow proper well planning with regard to the setting depth of the next casing, mud weights and alternatives during well control operations. • Collect regional information on formation strengths and stress magnitude for different applications including optimisation of future well planning, hole stability analysis and modelling, reservoir application. Prior to a test, a decision should be made to either increase the pressure until leak off occurs (as in the LOT) or to stop at a predetermined pressure for a (FIT). It should be noted that: • FIT does not obtain information on stress magnitude. • A LOT is designed and should be performed to determine, in a better way, the desired data without breaking down the formation. When a Formation Integrity Test is required, the maximum pumping pressure is often expressed in terms of'Equivalent Mud Weight' (EMW): Imperial units EMW= +MW 0.052 x TVD where: P = Pumping Pressure (psi) TVD = True Vertical Depth (ft) MW = Actual Mud Weight(PPG) Metric units EMW — Px10 + MW TVD where: P = Pumping Pressure (kg/cm2) TVD = True Vertical Depth (m) MW = Actual Mud Weight (kg/I). ENI S.p.A. S P E O IDENTIFICATION CODE PAC 207 OF 338 Ii18 E&P Division REVISION ST,AP-P-1-M-6140 0 1 I I I LOTts or FITs can be carried out in any open hole section and at any time while drilling the hole, even if it is customary to have it performed some metres (6-15 metres) below the casing. For instance, the casing seat can be in a shale and the first sand formation may be encountered several hundred feet deeper. This will certainly be more permeable than the shale, and a test can be performed to ascertain the maximum pressure this sand can hold. If it is lower than the shale just below the casing seat, this sand becomes the limiting factor. Note Information obtained from leak-off tests in straight holes is not applicable to deviated holes in the same field and vice versa. 15.1 TEST PROCEDURE Prior to performing a formation strength test, prepare a sheet of graph paper to record pressure, versus cumulative mud volume. 1) Drill out the float equipment, clean the rat hole and drill 5m of new hole. 2) Circulate a mud quantity equal to the internal string volume plus the new hole plus 50m internal casing volumes. This mud shall be cleaned and conditioned to the density and filtrate as indicated in the Mud Programme to be used for the next drilling phase. 3) Pull the bit back into the casing shoe. 4) Rig up the cementing unit to the drill pipe. The unit shall be equipped with high precision, low pressure gauges. The range of the pressure gauge shall be selected based on the actual mud weight and the estimated (LOT) or predetermined (FIT) pressure. A pressure recorder should be used during the test. The use of the rig pumps for making these tests is unsuitable. 5) Fill and test the lines with mud. 6) Break circulation with the cementing unit to make sure that the bit nozzles are clear. Stop pumping when circulation is established. 7) Close the top pipe rams or the annular. 8) In surface well head both flanged and multistage wellheads, open the annulus of the previous casings. In sub sea well head pay attention to not excide the burst pressure of the previous casing. 9) Pump slowly and in continuous way, until pressure builds up to approximately half the anticipated maximum surface pressure. 10) Once pressure is established, pump uniform volumes of mud and wait for the time required for the pressure to stabilise. The flow rate range is from 1i8 bbl/min (20 1/min) up to a maximum of 1 bbl/min (160 I/min), however values of 0.25 bbl (121/4" and smaller holes) or 0.50 bbl (171/2" hole) are commonly used. 11) Note the cumulative mud volume pumped, the final pumping and final static pressure. 12) Repeat steps (9) and (10) above and plot pressure versus cumulative mud volume for each increment of pumped volume. ENI S.p.A. S P E O IDENTIFICATION CODE PAG 208 OF 338 _ Eflil E&P Division _ REVISION STAP-P-1-M-6140 0 1 1 1 1 13) Continue this procedure until: • Two or three points on the plot are reached where the pressure deviates and falls below the approximate straight line (or if the pressure does not increase with the injected volume). The point on the plot where the curve begins to bend away from the straight line is called Leak Off Point (Refer to Figure 15-1) • Or the predetermined test pressure is reached. 14) Stop pumping, shut in the well, record and plot pressure versus time until stabilisation (usually it takes 15-20min). In the early stage (2-3min) one value every 15-30sec should be collected while for the remaining a value of pressure every 30- 60sec may be sufficient. The use of PACR or an equivalent device, if available, is preferred. 15) Bleed off the pressure and record the quantity of fluid returned into the cementing unit. Compare it to the volume used for the test to obtain the amount of fluid lost to the formation. 16) Open the BOP and calculate the formation strength in terms of `Equivalent Mud Weight' using the lowest between leak off point pressure and stabilised pressure. 17) Collect the data recorded during the test in a data sheet together with the following information: borehole diameter, depth of test, depth and type of the last casing, mud density, plastic viscosity, filtrate and gels (refer to the example on the next page). Note: The LOT pressure doesn't exceed the pressure which the casing was tested. Note: When a good zonal isolation behind the casing is imperative, the Leak- off test should be carried out with a retrievable packer to avoid pressurising the casing which may cause possible permanent damage to the cement bond by the creation of micro annuli in the cement. Note: The pumping rate should be kept within the limits described in step 9). If the rate is too low, filtration losses will mask any leakage loss, or, if the rate is too high the formation may suddenly break and the leak off pressure will not be determined. Also, the longer the open hole section, the higher should be the injection rate. If the initial pumping rate is not sufficient, the well should be depressurized and the test restarted with a higher rate. Note: If a float valve is used in the drilling string, the test can not be carried out by pumping down the drill pipe. In this case rig up the cementing unit to the choke or kill line, fill and test the lines against the fail-safe and establish circulation through the riser. Close the BOP and perform the formation strength test pumping down the annulus. ENI S.p.A. S P E O IDENTIFICATION CODE PAG 209 OF 338 •Em E&P Division REVISION STAP-P-1-M-6140 0 1 1 I I I LEAK-OFF TEST REPORT Report N° Date: WELL NAME: WELL CODE: I CONTRACTOR: RIG NAME: RIG CODE: Open hole depth(m): 825 Mud Type: FWGELS Rig type: J.UPs Hole Cfameter(in): 17'1/4 Weight(KgA): 1.3 R.K.B.ele vat on(m): 26 Last Csg.Shoe(m): 797 Marsh Mscosrty(sec/OI): 44 _Water Depth(m): 24 Csg.diameter On): 13'3/8 P.V.(cps): _ 19 Pumps: 12-P-160 Grade: .155 Y.P.06/100 flu): 5 Liners(in): 6.5 Weight(1b/t): 61 Gels(1b/100 t': 2/8 Flow Rate(bpi): 0.25 Mae.Burst pres(psi): 3103 W.L(coal min): 10.5 Lrtholog y Shale Expected EMW 1.68 KgIcm2I10 m Time Volume Pressure Time Volume Pressure Time Vdume Pressure (min) (bid) (Psi) (min) (bbl) (Psi) (min) (bbl( (Psi) 1 025 50 9 2 490 16 2 435 2 050 100 95 2 480 3 0.75 200 10 2 47D 4 1 00 300 10.5 2 463 5 125 400 11 2 455 6 150 500 11.5 2 450 7 1.75 570 12 2 445 8 2D0 600 13 2 440 8 2D0 550 14 2 437 8.5 21)0 505 _ 15 2 435 Nde. Pumped with a constant low rate of(bhp: 1.blume pumped(bbl): \.6lume returned(bbl): (put) 1000 900 - 800 - stop pump F1 700 ■ e 600 - ------- , (shut in curve S 500 / I S U 400 r - 18 minutes I e 300 200 100 0 . , 0 0,25 0,5 0,75 1 1,25 1,5 1,75 i 1 2 3 4 5 6 7 8 9 10 11 12 Cumulative Volume(bbq 4 Time mins RESULTS: (Press.,+Press.„o.)x10/Depth=[(1.3 x 797/10)+(430 x 0.07)]x10 1797=1.68(Kg/cm2/10 m) Note: I f Company Pe presentative + Figure 15-1 - Leak-Off Test Report REV DATE BY CK APP DESCRIPTION REV DATE BY APP DESCRIPTION 1 12/16/08 MRT AJR Add New Well Conductors 4-24 2 12/23/0 JFC JMS Add New Well Conductor OP26 Oliktok Cli OLIKTOK 5 Point 0 xl INTAKE DOCK OPP THIS I MODULE (kRP.i 5 ' SURVEY ,o TANK 4,-:-jpP6,°� � px DS-3R 0 9DEW U�SIZE 1 STP I ,MODULES I NOC T13N, R9E DS-3Q .-,18111 �J , iO �f SCALE: 1" = 150' Ds."---,30 19 ) 1(2d; ,,2,E 21l 4,_ o.M S TP PAD \,\ VICINITY MAP o,0 \ SCALE: 1" = 1 Mile °o°'°o°0Oc:D \ 09,0-. i-:)°�,°� \ o°-o ��°3r \ o�aao \ sr 0 C2090\s\c\c\ °o°o°_�s`��' T. \\ la c_-__-2? aaj�q •� \ \-�7 \ \ -1- OLIKTOK \ 0 POINT PAD a0, \ o. o.-0 \ ai" \ \ o / ° / \ \ SEE SHEET 3 FOR NOTES / \ \ U Existing Conductor / LOUNSBURY �J & ASSOCIATES, INC. • Conductor Asbuilt this survey / S LATORS ENGINEERS PLANNERS / AREA: MODULE: UNIT: ! Enoo P tIroo IIeIuII OLIKTOK POINT PAD Eno Eno WELL CONDUCTOR ASBUILT LOCATIONS CAD LK680D1 10/9/08 DRAWING NO: NSK 6.80—di I PART: 1 OF 3 I REV: 2 REV DATE BY CK APP DESCRIPTION REV DATE BY APP DESCRIPTION 1 12/16/08 MRT AJR Add New Well Conductors 4-24 2 12/23/08 JFC JMS Add New Well Conductor OP26 PROTRACTED SECTION 5, T. 13 N., R. 9 E., UMIAT MERIDIAN AK STATE PLANE(NAD83) LATITUDE(N) LONGITUDE(W) SEC. LINE PAD 0.G. WELL NO. 'y' 'X NAD83 NAD83 OFFSET ELEV. ELEV. F.N.L. F.E.L. OP-11 6,036,332.70 1,656,791.89 70°30'39.015" 149°51'57.587" 2,052 1,519 12.1 4.0 OP-12 6,036,328.85 1,656,784.83 70°30'38.977" 149°51'57.795" 2,056 1,526 12.2 4.0 0P03-P05 6,036,325.10 1,656,777.76 70°30'38.940" 149°51'58.004" 2,059 1,533 12.2 4.0 0PO4-P07 6,036,321.43 1,656,770.69 70°30':38.904" 149°51'58.212" 2,063 1,541 12.2 3.8 OP05 6,036,317.71 1,656,763.67 70°30'38.868" 149°51'58.419" 2,067 1,548 12.2 3.7 OP06 6,036,313.96 1,656,756.55 70°30'38.831" 149°51'58.629" 2,070 1,555 12.2 3.6 OP07 6,036,306.41 1,656,742.45 70°30'38.757" 149°51'59.045" 2,078 1,569 12.2 3.5 OP08 6,036,302.66 1,656,735.36 70°30'38.720" 149°51'59.254" 2,082 1,576 12.2 3.5 OP09 6,036,298.90 1,656,728.32 70°30'38.683" 149°51'59.462" 2,085 1,583 12.2 3.5 OP10 6,036,295.16 1,656,721.26 70°30'38.647" 149°51'59.670" 2,089 1,590 12.2 3.7 OP11 6,036,291.38 1,656,714.21 70°30'38.610" 149°51'59.878" 2,093 1,597 12.2 3.8 OP12 6,036,287.63 1,656,707.14 70°30'38.573" 149°52'00.086" 2,097 1,604 12.2 4.0 OP13 6,036,276.37 1,656,685.97 70°30'38.463" 149°52'00.711" 2,108 1,626 12.2 3.6 OP14 6,036,272.66 1,656,678.89 70°30'38.426" 149°52'00.920" 2,112 1,633 12.2 3.5 OP15 6,036,268.88 1,656,671.79 70°30'38.389" 149°52'01.129" 2,115 1,640 12.2 3.4 OP16 6,036,265.11 1,656,664.75 70°30'38.353" 149° 52'01.337" 2,119 1,647 12.2 3.3 OP17 6,036,261.36 1,656,657.70 70°30'38.316" 149°52'01.545" 2,123 1,654 12.2 3.2 OP18 6,036,257.62 1,656,650.62 70°30'38.279" 149°52'01.753" 2,127 1,681 12.2 3.1 OP19 6,036,250.09 1,656,636.50 70°30'38.205" 149°52'02.170" 2,134 1,675 12.2 2.5 OP20 6,036,246.31 1,656,629.41 70°30'38.168" 149°52'02.379" 2,138 1,682 12.2 2.2 OP21 6,036,242.57 1,656,622.39 70°30'38.132" 149°52'02.586" 2,141 1,689 12.2 1.9 OP22 6,036,238.82 1,656,615.39 70°30'38.095" 149°52'02.793" 2,145 1,696 12.2 1.7 OP23 6,036,235.05 1,656,608.27 70°30'38.058" 149°52'03.003" 2,149 1,703 12.2 1.5 OP24 6,036,231.36 1,656,601.27 70°30'38.022" 149°52'03.209" 2,153 1,710 12.2 1.3 • DISPOSAL WELLS AK STATE PLANE (NAD83) LATITUDE(N) LONGITUDE(W) SEC. LINE PAD 0.G. WELL NO. 'y' 'K NAD83 NAD83 OFFSET ELEV. ELEV. F.N.L. F.E.L. OP25 6,036,004.35 1,656,510.91 70°30'35.791" 149°52'05.885" 2,380 1,802 12.2 -2.7 OP26 6,036,012.10 1,656,525.47 70°30'35.867" 149°52'05.456" 2,372 1,787 12.2 -2.7 LOUNSBURY & ASSOCIATES, INC. SURVEYORS ENGINEERS PLANNERS f AREA: MODULE: UNIT: ._ Ern P tirolkeut� WELLOCONDUCTOR D P=11 VII ASBUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: LK680D1 10/9/08 NSK 6.80-d1 2 OF 3 2 REV DATE BY CK APP DESCRIPTION REV DATE BY _ APP DESCRIPTION 1 12/16/08 MRT AJR Add New Well Conductos 4-24 2 12/23/08 JFC JMS Add New Well Conductor OP26 NOTES 1. COORDINATES SHOWN ARE A.S.P. ZONE 4, NAD 83. DISTANCES SHOWN ARE TRUE HORIZONTAL DISTANCES. 2. GEODETIC COORDINATES SHOWN ARE NAD 83. 3. BASIS OF LOCATIONS ARE DERIVED FROM OPUS SOLUTIONS. 4. CONDUCTORS ARE LOCATED WITHIN PROTRACTED SECTION 5, TOWNSHIP 13 NORTH, RANGE 9 EAST, UMIAT MERIDIAN. 5. ALL ELEVATIONS SHOWN ARE B.P.M.S.L. DATUM. 6. SEE LOUNSBURY DOCUMENT L-2539 FOR NAD27 INFORMATION. •• OF 1� •4 PEE . ,... ...... -,;5_ SURVEYOR'S CERTIFICATE ,% �1■' �ej : * $ I HEREBY CERTIFY THAT I AM PROPERLY • �`h /\ REGISTERED AND LICENSED TO PRACTICE • �� LAND SURVEYING IN THE STATE OF j RO OKUS �o i ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY DONE BY ME OR UNDER MY �.�`f�'•.,OFJ. S-803 ....,1_�= �" DIRECT SUPERVISION AND THAT ALL .I.�clp••'••1 Z3,QQ•''•O`'4:' DIMENSIONS AS OF DECEMBER 23, 2008. '',,"*\∎"�••���•♦` 0. LOUNSBURY & ASSOCIATES, INC. SURVEYORS ENGINEERS PLANNERS AREA: MODULE: UNIT: Ezia - --- --- C�nii P�tiro11�iuii LIKTOK DINT PAD 01111 ASBUILT LOCATIONS CAD LK680D1 10/9/08 DRAWING NO: NSK 6.80—d1 PART: 3 OF 3 REV: 2 ' String Summary String OD/Weight/Grade Connection MD Interval(m) Drift Dia.(in) Burst Collapse Axial Surface Casing 13 3/8",68.000 ppf,L-80 BTC,L-80 32.0-2761.0 12.259 2.31 L 2.15 3.77 Burst Design(13 3/8"Surface Casing) Collapse Design(13 3/8"Surface Casing) Axial Design(13 3/8"Surface Casing) 650 650 650 U y N co 7 7 -c 1300 t 1300 , -c 1300 a a. a a) a) a) ❑ ❑ ❑ -o -o -o E m m Cl) 1950 - y 1950 - N 1950 (8 co co I a) a) a) 2600 2600 - 2600 - - - Design Load Line - Design Load Line - Design Load Line - Pi.e Rating - Pi.e Retina Pi.e Ratin• 0 1500 3000 4500 0 700 1400 2100 350000 700000 1050000 1400000 Burst Rating (psi) Collapse Rating (psi) Axial Force(lbf) Minimum Safety Factors(13 3/8"Surface Casing) Burst Load Data(13 3/8"Surface Casing) MD(m) OD/Weight/Grade Conection Burst(A) Collapse(A) Axial(A) Triaxial(A) Drilling Load: Pressure Test Test Pressure: 2000.00 psi 32 13 3/8",68.000 ppf,L-80 BTC,L-80 2.46 B5 L +100.00 C1 5.24 A5 3.18 B5 Mud Weight: 9.40 ppg 41 2.46 B5 L +100.00 C1 5.25 A5 3.18 135 Assigned Ext.Pressure: Fluid Gradients(w/Pore Pressure) 160 2.45 B5 L 32.60 C1 5.40 A5 3.17 65 200 2.45 B5 L 26.08 C1 5.45 A5 3.16 B5 Drilling Load: Fracture @ Shoe w/1/3 BHP at Surface 200 2.45 B5 L 26.08 C1 4.19 AS 3.12 B5 Surface Pressure(1/3*BHP): 529.80 psi 600 2.43 B5 L 8.72 C1 3.88 A5 3.00 65 Shoe Depth,MD: 2761.0 usft 600 2.43 85 L 8.72 C1 3.88 A5 2.99 B5 Fracture Pressure at Shoe: 1578.22 psi 800 2.41 B5 L 6.57 C1 4.00 AS 2.96 B5 Fracture Margin of Error: 0.00 ppg 800 2.41 05 L 6.57 C1 4.01 AS 2.96 B5 1000 2.40 B5 L 5.29 C1 4.15 AS 2.92 B5 External Pressure: Fluid Gradients(w/Pore Pressure) 1200 2.39 05 L 4.45 C1 4.29 AS 2.89 65 TOC,MD: 32.0 usft 1200 2.3905 L 4.45 C1 4.31 AS 2.89 65 Prior Shoe,MD: 160.0 usft 1300 2.38 B5 L 4.13 C1 3.77 A5 2.77 B5 Mud Weight Above TOC: 8.33 ppg 1363 2.38 B5 L 3.96 C1 4.38 A4 2.84 B5 Fluid Gradient Below TOC: 8.33 ppg 1500 2.37 B5 L 3.63 C1 4.45 A4 3.00 B5 Pore Pressure In Open Hole: No 1900 2.35 B5 L 2.94 C1 4.69 A4 2.95 B5 2040 2.34 B5 L 2.76 C1 4.78 A4 2.71 85 2100 2.34 135 L 2.69 C1 4.14 A5 2.62 B5 Axial Load Data(13 3/8"Surface Casing) 2100 2.34 B5 L 2.69 C1 4.15 AS 2.62 BS 2200 2.33 B5 L 2.58 Cl 4.21 A5 2.61 BS Running in Hole-Avg.Speed: 0.7 ft/s 2300 2.33 B5 L 2.49 C1 4.27 AS 2.59 65 2400 2.33 B5 L 2.40 Cl 4.33 A5 2.58 B5 Overpull Force: 100000 lbf 2500 2.32 B5 L 2.32 C1 4.44 AS 2.58 85 Green Cement Pressure Test: 1500.00 psi 2500 2.32 65 L 2.32 C1 4.40 A5 2.57 65 2600 2.32 85 L 2.25 C1 4.46 AS 2.56 85 2750 2.31 65 L 2.16 C1 4.55 A5 2.54 65 Collapse Load Data(13 3/8"Surface Casing) 2750 2.31 B5 L 2.16 C1 5.32 A4 2.88 B5 2760 2.31 B5 L 2.15 C1 5.33 A4 2.88 B5 Drilling Load: Full/Partial Evacuation 2761 2.31 B5 L 2.15 C1 5.33 A4 2.88 B5 Mud Weight: 9.40 ppg Mud Level,MD: 2761.0 usft B5 Pressure Test Assigned External Pressurefluid Gradients(w/Pore Pressure) C1 Full/Partial Evacuation External Pressurefluid Gradients(w/Pore Pressure) A4 Overpull Force TOC,MD: 32.0 usft AS Green Cement Pressure Test(Axial) Prior Shoe,MD: 160.0 usft Fluid Gradient Above TOC: 8.33 ppg Fluid Gradient Below TOC: 8.33 ppg Pore Pressure In Open Hole Below TOC: No String Summary String OD/Weight/Grade Connection MD Interval(m) Drift Dia.(in) Burst Collapse Axial Production Casing 9 5/8",40.000 ppf,L-80 Series 500 Type 563(TC) 32.0-9377.0 8.750 A 3.91 1.74 3.41 Burst Design(9 5/8"Production Casing) Collapse Design(9 5/8"Production Casing) Axial Design(9 5/8"Production Casing) 2500 1- 2500 2500 (1) to rn a o_ i 0 5000 W 5000 t - p 5000 v a N 2 U U U) as as as 2 7500 7500 - 1- _ 2 7500 - Design Load Line - Design Load Line - Design Load Line 10000 - --- Pi. Rath. 10000 -_-Pi.e Ratin. 10000 Pi se Ratin. 0 2500 5000 7500 0 950 1900 2850 i 200000 400000 600000 800000 Burst Rating (psi) Collapse Rating (psi) Axial Force (lbf) Minimum Safety Factors(9 5/8"Production Casing) Burst Load Data(9 5/8"Production Casing) MD(m) OD/Weight/Grade Conection Burst(A) Collapse(A) Axial(A) Triaxial(A) Production Load: Tubing Leak Packer Fluid Density: 8.60 ppg 32 9 5/8",40.000 ppf,L-80 4.00 B6 +100.00 C5 3.98 A5 3.55 A5 Packer Depth,MD: 18327.0 usft 41 4.00 B6 +100.00 C5 3.98 AS 3.55 A5 Perforation Depth,MD: 18327.2 usft 200 Series 500 Type 563(TC) 4.02 B6 31.11 C5 4.04 A4 3.58 A5 Gas Gravity: 0.70 200 4.02 B6 31.10 C5 3.52 A5 3.37 AS Reservoir Pressure: 1569.25 psi 600 4.07 B6 10.44 C5 3.42 AS 3.31 A5 Assigned Ext.Pressure: Fluid Gradients(w!Pore Pressure) 600 4.07 B6 10.44 C5 3.41 AS 3.31 AS 724 4.08 B6 8.69 C5 3.47 A4 3.34 A5 External Pressure: Fluid Gradients(w/Pore Pressure) 800 4.09 B6 7.88 C5 3.48 A4 3.35 AS TOC,MD: 7119.0 usft 1000 4.12 B6 6.35 C5 3.48 A4 3.40 AS Prior Shoe,MD: 2761.0 usft 1200 4.14 B6 5.35 C5 3.49 A4 3.40 A4 Mud Weight Above TOC: 9.40 ppg 1284 4.15 B6 5.02 C5 3.49 A4 3.33 AS Fluid Gradient Below TOC: 8.33 ppg 1300 4.15 B6 4.96 C5 3.45 AS 3.31 AS Pore Pressure In Open Hole: Yes 1309 4.15 B6 4.93 C5 3.49 A4 3.32 AS 1500 4.17 B6 4.36 C5 3.50 A4 3.40 A4 1900 4.22 B6 3.53 C5 3.52 A4 3.39 A4 Axial Load Data(9 5/8"Production Casing) 2100 4.24 B6 3.23 C5 3.53 A4 3.39 A4 2200 4.25 B6 3.10 C5 3.54 A4 3.39 A4 Running in Hole-Avg.Speed: 0.7 ft/s 2300 4.26 B6 2.98 C5 3.54 A4 3.38 A4 2400 4.27 B6 2.88 C5 3.55 A4 3.38 A4 Overpull Force: 100000 lbf 2500 4.28 B6 2.79 C5 3.55 A4 3.38 A4 2600 4.29 B6 2.70 C5 3.56 A4 3.38 A4 Green Cement Pressure Test: 1800.00 psi 2750 4.30 B6 2.59 C5 3.57 A4 3.39 A4 2761 4.31 B6 2.58 C5 3.57 A4 3.39 A4 2869 4.31 B6 2.51 C5 3.57 A4 3.39 A4 2900 4.32 86 2.50 C5 3.57 A4 3.39 A4 3000 4.33 B6 2.44 C5 3.58 A4 3.39 A4 Collapse Load Data(9 5/8"Production Casing) 3100 4.33 B6 2.39 C5 3.59 A4 3.39 A4 3200 4.34 B6 2.34 C5 3.59 A4 3.39 A4 Production Load: Full Evacuation 3300 4.35 B6 2.30 C5 3.60 A4 3.40 A4 Assigned External Pressure:Fluid Gradients(w/Pore Pressure) 3400 4.35 B6 2.27 C5 3.61 A4 3.40 A4 3500 4.36 B6 2.23 C5 3.62 A4 3.40 A4 External PressureFluid Gradients(w/Pore Pressure) 3600 4.36 B6 2.21 C5 3.62 A4 3.41 A4 TOC,MD: 7119.0 usft 3700 4.37 B6 2.19 C5 3.63 A4 3.41 A4 Prior Shoe,MD: 2761.0 usft 3800 4.37 B6 2.17 C5 3.64 A4 3.42 A4 Fluid Gradient Above TOC: 9.40 ppg 3905 4.37 BE 2.16 C5 3.65 A4 3.42 A4 Fluid Gradient Below TOC: 8.33 ppg 7119 4.44 BE 1.85 C5 3.92 A4 3.62 A4 Pore Pressure In Open Hole Below TOC: No 7119 3.91 B6 1.85 C5 3.92 A4 3.62 A4 7500 3.91 BE 1.83 C5 4.02 A4 3.70 A4 7900 3.91 B6 1.80 C5 4.16 A4 3.69 C5 8200 3.91 B6 1.78 C5 4.30 A4 3.66 C5 8500 3.91 B6 1.77 C5 4.47 A4 3.63 C5 8800 3.91 BE 1.76 C5 4.66 A4 3.61 C5 8800 3.91 BE 1.76 C5 4.66 A4 3.60 C5 8900 3.91 B6 1.75 C5 4.73 A4 4.02 C5 9376 3.91 BE 1.74 C5 5.10 A4 3.99 C5 9377 3.91 BE 1.74 C5 5.11 A4 3.99 C5 BE Tubing Leak C5 Full Evacuation Production A4 Overpull Force AS Green Cement Pressure Test(Axial) D REMCA,( E091V 2. E13 L---: AOGCC cs, rig 23 E .9 4 - 00 7 2 0 11°' II 9 8 _. .. 4 8 _ I ,t::; vi 1 LS. o6- o 0- 0 40 g E - ; co ° r1 0 i i a 0 p 0 F LA 3 _ ...------ > > 6- i 00 ..; _ 8 > = 1 t o I 6 ,16 ° 6 > 1 0 c) a I= i E' iu 15, F g 2--; L I i - g w :75 n 0 N CO ;2.:" t7), ? EZ 0 0 LL Q 0 E •- &• "a O 1 ,? • 1 7c7 ...! E IT ii = a . 2 - r II 8 0 — 9 0 ... o g . t t t LI 0 p.0 0 2 1 fl 0 > - a.) N° zi., D :,4 ; N - .„ 3 •-■ -4- c s i co c on3 E la I 0, ... .a: c., :iiE ; F co -21 ; t LT, 0 - - > I 0 , 0 I I lu, 3 E 6 0 :5 . . i a g - 4 I 0 (7'7 11 0 7, (0 I 0 ii, C. (.0 <0 el 0 0) r, 0 1 F, I v 0 > '4 il .-- 6 oQ 0 , . o° e o •• S , o .Y.- ro - r 11 s c a° E s "R 0 1 8 i - z . 0 II (0 (1) CO cO 2 c E o 79 8 .... . . . .c_ .. .... 0 6'-• 1 1 ; w .rt 0 ° 0 4 N S o 0 ii,- w ... I '' ... t 74 -8t' c 4., .. E u !..2 :, co 0 ii.2, E ..1c .- 0 41. 0 ii.. t '5 • s T., E 1 : - 0 a ... 0 ,.>.3 s ' iiri .74' 0° a s 1 . 0 - 8 - ■ 0 0 c0 C 20 Lt ■ 0 sl- N 8 N 1 CU 'ci i : ck W 1 ' ,'A g g. t..9 2'-'., ) 7.7-i, *-E H F4.-2 ' .11 g 0 r' (U)009:l.=sleoS CIA.I. R0 = as 0 8,T 0.....\E '2..g i. o N 0 0 ....... o9 't— r.;.. , 1 •= .....- <7,F. (4)009:l =a leoS CIAl t tZ t qg 9 0 oc° ) 0_ ,-' A 0 I& 4. t. t ., 0 0 . 80 0 8 8 0 0 N 2 vt (1)000 VL=ale3S and Schl � D 2rnnA FIELD 0 9 2013 OP08-04L1 (P1) I Nikaitchuq Oliktok Point (`^/ Surface Locabon NAD27 Alaska State Plane Zone 04 US Feel /WO G V 31.c6r G.I. C -nbc,31,2013 Let: N 70 3039 762 NoMirg: 60365`5.67905 Sid Com: 0.129' ND 3ft above MSLI 19.587' ES !nT l Lon: W 1495147.919 Eadirg: 516703945US Scale Fact.099990032 - - Srvy Data:Apn101,2013 -3000 -2000 -1000 0 1000 • • Tia End Cry • 8000 OP08-0411 Tg 24 8000 Cry 2/100 (Pi) e • End Cry .�� OP08-04L1 Tgt 22 OP08-04 A Cry 5/100 5-112" End Cry , End Cry OP08-04L1 Tgt 23 -_ OP08-04L1 Tgt 20 Cry 6/100 Cry 2/100 End Cry End Cry 7000 4f9.4:944.t.Tat21. .... •..0Pp8-04L4 Tgt 46 7000 Cry 2/100 Cry 3/1DO End Cry 4 End Cry OP08-04 Tgt 18 OP08.04L1 Tgt 16 L4 Cry 5/100 Cry 2/100 End Cry End Cry C OPOS-04L1 Tgt 17 OP08-04L1 Tgt t5 Cry 5/100 Cry 5/100 . End Cry End Cry OP08-0' l Tgt 13 6000 b OP08-04PB1 OPO4.94�j Tgt 14 • Cry 9.75/100 Cry 4/100 6000 end Cry End Cry OP08-04L1 Tgt 11 OP08-04L1 Tgt 12 Cry 3.76/100 Cry 3.75/100 End Cry to OP08-04L1 Tgt 10 ik End Cry Cry 3.75/100 OP08-04L1 Tgt 9 End Cry 4 Cry 3.5/100 , 5000 0P08-04L1 Tgt 8 1111* 5000 A N Cry 3.5/100 1.' End Cry A A OP08-04L1 Tgt 7 Z _ End Cry Cry 3/100 OP08-04L1 Tgt 6 `' End Cry O Cry 3/100 OP08-04L1 Tgt 5 O 4000 End Cry I•I. Cry 3.5/100 4000 II 0P08-04L7 Tgt 4 .• End Cry t3 Cry 3/100 111 OP08-04L1 Tgt 3 0 W End Cry Cry 3/100 (.0 OP08-04L1 Tgt 2 �- End Cry V Cry 2.5/100 V V OP08-04L1 Tgt 1 3000 • - 3000 95/8" Cry 5/100 End Cry Cry 6/100 Base Whipstock Top Whipstock Tie-In Survey 2000 2000 1000 1000 13a16" r 0 RTE 0 -3000 -2000 -1000 0 1000 Bettis, Patricia K (DOA) From: Wright James [James.Wright @enipetroleum.com] Sent: Thursday, May 09, 2013 10:49 AM To: Bettis, Patricia K(DOA) Subject: Fw: Permit to Drill Application: OP08-04L1 Attachments: OP08-04L1 (P1) directional report.pdf Patricia-please see attached entire report. James From: Christopher Scott DeLapp [mailto:delapp @slb.com] Sent: Thursday, May 09, 2013 01:25 PM To: Wright James Subject: RE: Permit to Drill Application: OP08-04L1 James, not sure what it is they are asking for....The plan view and vertical view? Here's the report. Do they mean a spider plot with offset wells? C.Scott DeLapp Schlumherger Drilling&Measurements Drilling Engineering Center 907-273-1776 Office 907-360-9433 Cell e-mail:delapp @slb.com The information contained in this communication is confidential and proprietary intended only for the individual or entity to which it is addressed. Any unauthorized use, distribution, copying, or disclosure of this communication is strictly y proh b t ed. If you have received - h s communication. in e.rr , pease contact thu sender immediately. From: Wright James [mailto:James.Wright @enipetroleum.com] Sent: Thursday, May 09, 2013 9:51 AM To: Christopher Scott DeLapp Subject: Fw: Permit to Drill Application: OP08-04L1 Scott, can you help me with aogcc request below. James wright Eni From: Bettis, Patricia K (DOA) [mailto:patricia.bettis @alaska.gov] Sent: Thursday, May 09, 2013 12:34 PM To: Wright James Subject: Permit to Drill Application: OP08-04L1 Good morning James, The permit to drill application is missing the cross-sectional and the planar plats for the proposed wellbore, 20 AAC 25.050(b)(1). For reference, these plats were provided for the OP19-N permit to drill application. If you have any questions on the matter, please do not hesitate to call me. These plats for the proposed OP08-04L1 well may be sent to me via e-mail. 1 Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis @alaska.gov. This message may contain information that is confidential, and is being sent exclusively to the Recipient. If you are not the designated Recipient, you are prohibited from utilizing, copying or divulging the information contained in this message,or taking any action whatsoever on the basis of the information herein. If you have received this message by mistake, we ask you to kindly inform the Sender and to delete the message. It is understood that, with regard to messages sent by its network, the Company is not responsible for any statements made or opinions expressed, that are not strictly related to the Company's operations. This message may contain information that is confidential, and is being sent exclusively to the Recipient. If you are not the designated Recipient, you are prohibited from utilizing, copying or divulging the information contained in this message,or taking any action whatsoever on the basis of the information herein. If you have received this message by mistake, we ask you to kindly inform the Sender and to delete the message. It is understood that, with regard to messages sent by its network, the Company is not responsible for any statements made or opinions expressed, that are not strictly related to the Company's operations. 2 Bettis, Patricia K (DOA) From: Wright James [James.Wright @enipetroleum.com] Sent: Wednesday, May 08, 2013 11:56 AM To: Bettis, Patricia K(DOA) Subject: Re: Permit to Drill Application: OP08-04L1 Hello Patricia! Yes,the whipstock will be set at 4616'.This will be the kickoff pt for the sidetrack.The 300'md is the kickoff pt for the original OPO4 well. We will be producing comingled fluid from both wellbores, but each welibore will be in the OA sand. Thank you James From: Bettis, Patricia K(DOA) [mailto:patricia.bettisCaalaska.gov] Sent: Wednesday, May 08, 2013 02:32 PM To: Wright James Subject: Permit to Drill Application: OP08-04L1 Good morning James, I have started the review of the Permit to Drill application. Please verify the kickoff depth for this lateral. Box 16 of the application states the kickoff depth at 300'.The survey shows the base whipstock at 4,616'. From the application it is stated that comingled production will come from both OP08-04 and OP08-04L1. Is this correct? Thank You. Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. This message may contain information that is confidential, and is being sent exclusively to the Recipient. If you are not the designated Recipient, you are prohibited from utilizing, copying or divulging the information contained in this message,or taking any action whatsoever on the basis of the information herein. If you have received this message by mistake, we ask you to kindly inform the Sender and to delete the message. It is understood that, with regard to messages sent by its network, the Company is not responsible for any statements made or opinions expressed, that are not strictly related to the Company's operations. Bettis, Patricia K (DOA) From: Bettis, Patricia K(DOA) Sent: Wednesday, May 08, 2013 11:33 AM To: 'James.Wright @enipetroleum.com' Subject: Permit to Drill Application: OP08-04L1 Good morning James, I have started the review of the Permit to Drill application. Please verify the kickoff depth for this lateral. Box 16 of the application states the kickoff depth at 300'.The survey shows the base whipstock at 4,616'. From the application it is stated that comingled production will come from both OP08-04 and OP08-04L1. Is this correct? Thank You. Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 TRANSMITTAL LETTER CHECKLIST WELL NAME A),-146, h . bb/30 g 04/41 `�I PTD# 0,136(0 1 V Development Service Exploratory Stratigraphic Test Non-Conventional Well I/ I FIELD: /U►�c�i"�Ch POOL: i/ � rc /V K�, r .r Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well -__• SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for(name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 /FcaSf Tc,c C.. FAN\ /O 4/01 (�.usai /o4o) fr o, o, (4- c.,1( 7b .d/ ) J r �i� L 0 To m C 0- N N N o a) E N n o 0 p m E _c) S H c o Q > U 0) N Q c - N O. O C a) a c d M O o (o O O CO o d (o co a) O o @ •p W ~ O N CO > L O c N n N E c W co ° N L :7_3. N 0) 7 p o 0 N co n 2 O co co a s co c cos V E v -_ O p c O ° ° E 7 rn L a) a 0) c co °) Q U N 7 n c - •co C 2 C L (n 3 -o n (0 N O O Q_ .- .n 7 3 O o v a 7 c N Z w C CT co N V 0) O c a) 0 O- O a) a) 3 O" CD W = C n 0) O N •- - O N a) -o > .X C N c r _ co 0 0 0 7 d Q) ° N a) .X Q (N = co > d C rn 0 o 3 °� N 3 a) N c 3 o a n E c a = o 4.0 - a) m _ a) 0 3 m O ° n vi c `� C M • a O a L => N E >>3 w ° O L N N - = > (o N 4 L = 'N J ' C X 3 : n a) 2 N O 3 0 a) n J_ N c a3 as a) 3 O W w 0 -o w m C c6 N N > a a 0 c cu a) ob O o E -c E Q ° O w 0 m a n O so LLL i_ C N O N Q .5) N m 0) m O - O (O LL w - o co c c0 O m N .0 00 -0 V U (p (O O 0 (n (n Oj J m as ° a) w ° n m y N � L@ JU` I p C_ Q C oo C O O N R E c _ N c6 7 U < p ° N O d E V) N 3 O O d N �) Y L N (0 H O UO < Om.. a) .L-• c Q O N — f6 .t a5 co n >=> L 0) Q) ° C Q O J �' N O d C 0 'O N a) a U. L (N0 00 S. 0 E a a3.3 co I o _ Z U) N ,c E w w N ° ii .N ° Uai aai ° Cl) o 0 0) co .3 n ti N L O o°o a�°i 3 "0 o al C C C r EO O i o ccoo .3 N co N N (o N N N N 0- ) ( N `� a) d (o N Ca 0 O co "( U 0 L 0 0 0 C N - .> E a) co p 0)Z M O _ CO CO 0 7 O U Cl) a CO 3 E N 4O N d ,O C 0 O 0 CO 0 a) p ° c) y o m 't `tt d L N 'x X s co V m co a > ) Q d O O o 7 3 O a) CE O a) a) Q (N N N X U) C' w < O Z O O U CO CO c N O H d z z Z I x w p 0 v •3 a. o N > co To 0 LLI o a co O @ (. < < U)) 0) N 0) aa)) 0) 0 0) 0) 0) 0 0) < < < < < < < 0 aN) 0) < aa)) < 0 0) 0) 0) 0) 0 < 0) aN) < < < a Z Z } } } } } } } } } } } } Z Z Z Z Z Z Z Z } >- Z } Z } } } } } Z Z } } Z Z Z N T I- -0- O N u_ T O ✓ N o c To ° a) E 3 - E N O U U 'j c a) U) N c O O O U O ,- T c dt� (�- �(.0 n >. N O w O s.'711/41# ° c >a) U� 3 E °O P M _N U LL O LL c O p_ c 'j N o a N m E Al _J cc N a a3 O N N n U LL N �. (�` C > C O U) n a) �) W O O u N co 7 c 0 p T C 7 0) Cr a N Y to Q Q a`) Q o N N o c a) 0) a w N a Q a) U a) a a0 co a) 8O o N — c _ E N o O aa) E- 7 °a .t c E _0 N m n T E o i!tij U o 7 3 c > .3 .o 'a) ao co o N o n c c N a 3 �> o o •n) cn o C c@ w a a 7 0 ° a n _. 0 u°, O (r) = a) 7 E > in co 7 E p -° ° «S E a) m '9 o co' -° O c v7) N Cl) O O) 3 cn c o) L c N 3 0' cn 7 < N N N 0 0) _ V 0 .c a 0 a) .0 _° (o N 0- D O C 0 CO 0 0 0) O L N C .. U) 0 yo > U > a O- E N d N C O O. `O Q1 N U U M E E - a c c E a) N O C C N F .-. C O a8 C N .L.-� m O- N L n C C ~ Z Q O O a 7 O N c 30 O O) 7 (� .Q fl n 0 U o •• d ° - .3 O j N N T O yO YO .0 ,° a) U) '; .c T O 7 7 2 a a) (o Y a) 2 O O j O O E (o co (o Q (o L N '>, O 01 O O C N• Z U N n c c a m m ° -C -C 13 a) 0 7 a ` E Q a) a) ° c� = ° m o N n a 3 O m o " 3 c E 1 U E (o c 0 @ @ (6 n n - a (o _0 a) N N C a) N M co N U i N ° N N fo N O W O o Z a s c N N •� a� a 3 3 ° a) ., a 0 '0 0 7 °v co °o N n •Q 0 oa 0 3 0 L a U O F C 2 c '- 'O 'O > 0O a) .a a s O 8 'E O O a) O O c 0' N -0 N co O 0) c. a Q N. 7 0 d a a) as ° o o Y a� o E E E ' o a) w c co Q ° ° a .° a N - U 7 7 a c V U n o a) a) a 0 .- N a (o E' 0) O :. 7 C O N 0 W N 0 C E m O O C 3 15 c a .- N cd L E C O- _ = a5 N C a) -° N P_°) T 73 3 2 ac •N O (!) o n a) d O) @ N c .0 Q Q a)) N >. a3 N N a) 3 c -0 o C 0• Q N c Y N - 7 n y N o 7 o O N >, .. N iL O m ID - a a a 0 • c co .0 o -0 a 15 a) N 'N a) n > 0) m L N (n 6 ° 0 c m 2 E a) E a) m o L c c '3 7 (° m m ° _ 3 a ° N .0 0 O io c a) c > a> 7 3 a3 a3 a3 C N m U a3 a O U = 0 ._ 0 L 5 a N as = c .0 co co co O c c c O 0 0 0 ° 4 0 0 - o ° o U a) o o 0) a) -o m -t cow u co E 3 U) c .0 a) 0 -° Z ° 0 7 0 0 0 .� .> as o ° a 7o ° > > 3 C a � a a) c w w Y Y ° L O- E f0 6 Y W o U ai 'E U)> U)> m> Cl) a a a`) ( >o m 0 2 2 2 m -O (a -o 'o C O O L ° O- 0) U) m 'a a) o p V c z d J D > > > cn 4' 0 0 a LL U > Q d U co U U U U a ' a "-• D CO CO U n 2 a 0 co us U W n N- O r- N M V Cl) (O CO 0) O N M V CO (O N- CO 0) O N M V (f) c0 r CO O) V EO N CO V (c) <0 c- CO 0) ,'- •- N N N N N N N N N N M M M M M M M M M M v 1— M M M 0 2 O C N O a) O a) N U o O E Q O (° D o O y( W o c o E N J '- N C~ CD 0 E J tI•E Q m am c am 0 E < a c Q c�7 0 Q a Well History File APPENI1X Infonnation of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of infor nation. oG ► RECEIVED HALLIBURTON AUG 2``4=4 0 8 2013 Sperry Drilling AOGCC Surface Data Logging End of Well Report OP08-04L1 OP08-04L1 PB1 Client: ENI Petroleum Field: Nikaitchuq Rig: Nabors 245 Date: July 5, 2013 � rm t + HALLIBURTON I Sperry Drilling TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. Formation Tops 5. Mud Record 6. Bit Record 7. Morning Reports 8. Survey Report Digital Data to include: Final Logs Halliburton Log Viewer EMF Log Viewer EOW Report PDF Version ADI Backup HALLIBURTON I Sperry Drilling GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Nabors 245 Well: OP08-04L1 &OP08-04L1 PB1 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-029-23424-60-00 Sperry Job Number: AK-AM-0900489693 Job Start Date: 03 June 2013 Spud Date: 15 June 2013 Total Depth: 11,344' MD, 3,745' TVD North Reference: True Magnetic Declination: 21.591° Magnetic Dip Angle: 80.988° Total Magnetic Field Strength: 57641.275 nT Date Of Magnetic Data: 19 June 2013 Wellhead Coordinates N: North 70° 30' 39.762" Wellhead Coordinates W: West 149° 51' 47.925" Drill Floor Elevation 53.30' Ground Elevation: 12.2' Permanent Datum: Mean Sea Level SDL Engineers: Emil Opitz, Andrew Bongard, Josiah Failing, Charles Sinn Company Geologist: Andrew Buchanan I Company Representatives: Bruce Simonson, Ben Perry SSDS Unit Number: 121 HALLIBURTON I Sperry Drilling DAILY SUMMARY 06/03/2013—06/10/2013 SDL arrived on location. Began rigging up unit and gas equipment. Installed gas trap and poly flow lines. Calibrated the 8800 Gas Analyzer and 8900 Gas Chromatograph. Set up WITS to/from Canrig and configure INSITE. 06/11/2013 Continue to single in on 5" drill pipe with milling assembly. The top of the liner was tagged at 4792' MD. Pumped 18 barrels to fill the hole. Pumped at 3 bpm for 10 minutes and established loss rates- 72 barrels an hour, dynamic loss rate, 50 barrels an hour, static loss rate. Max gas of 41 units was recorded while circulating. Pulled out of hole to surface. Rigged up to set bridge plug. Run in the hole on 5" drill pipe to set plug. Gas: The max gas was 41 units and the average gas was 2 units. 06/12/2013 Trip in hole on 5" drill pipe with bridge plug. Set the plug at 4763' MD. Monitor the well for losses. The hole is static. Trip out of the hole. Run in the hole with wireline and log cased hole. Gas: There was no gas data to report. 06/13/2013 Picked up BHA retrieving head and trip in the hole until the bridge plug was tagged. Retrieve bridge plug and trip out of the hole. Fill hole with 2x displacement. Lay down BHA and retrieving head. Clean rig floor and prepare to pick up BHA. Gas: There was no gas data to report. 06/14/2013 Make-up whipstock/watermelon mill assembly BHA. Trip in the hole with 5" drill pipe at 2 minutes a stand. Run-in-hole to 4399' MD. Service rig and grease draw works. Orient and set whipstock liner top at 4793' MD (top of window at 4351' MD). Displace well to 9.2 ppg OBM. Begin cutting window (bottom of window at 4368' MD). Drill rat hole to 4388' MD. Perform FIT test 11.9 ppg EMW. Gas: The max gas was 29 units at 4376' MD and the average drilling background gas was 13 units. 06/15/2013 Run-in hole and continue drilling rathole to TD at 4488' MD. Circulate one bottoms up at TD. Trip out of the hole. Begin to test BOPs. Gas: The max gas was 96 units at 4410' MD and the average drilling background gas was 46 units. 06/16/2013 Test BOPs. Trip in the hole with mud motor BHA. Orient motor high-side through window with pumps off. Tag bottom at 4488' MD. Drill ahead to 4868' MD. Circulate one bottoms up and prepare to pull-out-of-hole. Gas: The max gas was 141 units at 4765' MD and the average drilling background gas was 50 units. The max trip gas was 42 units. HALLIBURTON 1 Sperry Drilling 06/17/2013 Circulate and condition mud prior to pulling out of the hole. Flow check-static. Laid down BHA and picked up BHA#2. Pick up 4.5" drill pipe singles and circulate one bottoms-up, and prepare to pull-out-of-hole. Run in hole. Slip and cut drill line. Calibrate blocks. Gas: No significant gas data. 06/18/2013 Run in the hole with BHA#2, working through milled window. Drill ahead to 5290' MD. Perform FIT to 10.6 ppg EMW. Resume drilling ahead. Gas: The max gas was 1722 units at 5753' MD and the average drilling background gas was 98 units. 06/19/2013 Drill ahead to 6550' MD. Back ream out of the hole to 5818' MD and perform an open hole sidetrack. Successfully kick off and gasses since crossing a possible fault around 6590' MD. Gas: The max gas was 1351 units at 6518' MD and the average drilling background gas was 37 units. 06/20/2013 Continue to drill ahead to 8304' MD. Connection gasses and are no longer occurring/ noticeable as of 1400hrs/-7800' MD. Gas: The max gas was 1553 units at 8198' MD and the average drilling background gas was 104 units. The max connection gas was 372 units. 06/21/2013 Continue to drill ahead to 9833' MD. Gas: The max gas was 2123 units at 8323' MD and the average drilling background gas was 136 units. 06/22/2013 Continue to drill ahead to 11270' MD. Gas: The max gas was 1822 units at 11152' MD and the average drilling background gas was 522 units. 06/23/2013 Continue to drill ahead to TD of 11344' MD. Back ream out of the hole per K&M. Gas: The max gas was 949 units at 11296' MD and the average drilling background gas was 604 units. The max trip gas was 163 units. 06/24/2013 Finish pull out of hole and laid down BHA#2. Pick up cleanout BHA and run in hole. Circulate three bottoms up to SF 9.1 ppg OBM. Gas: The max trip gas was 357 units. 06/25/2013 Trip out of hole per K&M. Displace casing to 8.8 ppg brine. Pull out of hole and lay down. Gas: No significant gas data. HALLIBURTON I Sperry Drilling 06/26/2013 Run in hole with whipstock retrieval tool. Retrieve whipstock, and pull out of hole for liner run. Gas: No significant gas data. 06/27/2013 Run in hole with 5.5" slotted liner. Rig down casing equipment, rig up bails and 5" elevator on top drive to finish running liner in hole to bottom. Gas: No significant gas. 06/28/2013 Finish running liner to bottom. Pulling out of hole and laying down drill pipe. Gas: No significant gas data. HALLIBURTDII Days vs. Depth Sperry Drilling WELL NAME: OP08-04L1 LOCATION: Nikatichuq OPERATOR: Eni Petroleum Co. AREA: North Slope Borough MUD CO: MiSWACO STATE: Alaska RIG: Nabors 245 SPUD: 10 Jun 2013 SPERRY JOB: AK-XX-0900489693 TD: 23 Jun 2013 4000 _ 1--4--1--1 I i I 03 June 2013 ■ Sperry SDL Arrived on Location ' ,7 _ _ Commenced 8.5"Production - . Hole Section = 5000 -- On Bot: 18:06 14 June 2013 I ■ - - I ! — : _ ..+. . 6000 --- - Open Hole Sidetrack - '- 1 5830'MD,3665'TVD 19 Jun 2013 7000 - 1 t Q -. C _. G) " 8000 U) _ _-, , CU I I i 9000 , J 10000 ,-r TD Production Hole Section I 3j 11344' MD,3745'TVD - r Off Bot:01:15 23 Jun 2013 11000 -- d w 12000 , - 0 5 10 15 20 25 30 35 Rig Days !-IALL1BLJRTON r}.; y ill Formation Tops WELL NAME: OP08-04L1 LOCATION: Nikaitchuq OPERATOR: Eni Petroleum AREA: North Slope Borough MUD CO: MiSwaco STATE: Alaska RIG: Nabors 245E SPUD: 10-Jun-2013 SPERRY JOB: AK-XX-0900489693 TD: 23-Jun-2013 Marker MD INC AZ TVD TVD55 8 1/2"OP08-0411 Borehole Top of window 4,351.0 71.3 _ 355.8 3,514.6 -3,461.3 Bottom of window 4,368.0 71.3 356.3 3,520.0 -3,466.7 N-Sequence Base Not logged _ OA-Sand Top 4,940.9 86.7 _ 11.6 3,626.3 -3,573.0 OA-Sand Top 5,100.9 89.4 9.2 3,631.1 -3,577.8 OA-Sand Top 5,208.1 86.5 6.3 3,635.8 -3,582.5 Fault A 5,659.0 86.7 359.8 3,657.0 -3,603.7 OA-4 Top 5,842.7 87.1 358.6 3,666.5 -3,613.2 Fault B 5,955.0 87.9 358 7 3,671.5 -3,618.2 Base OA-Sand 6,173.2 90.8 354.0 3,673.2 -3,619.9 OA-4 Top 6,267.4 90.3 355.0 3,672.0 -3,618.7 Fault C 6,687.0 85.7 355.9 3,684.0 -3,630.7 Fault D 6,944.1 86.3 357.4 3,704.5 -3,651.2 OA-Sand Top 7,092.1 88.3 356.7 3,710.1 -3,656.8 OA-Sand Top 7,316.2 85.5 357.2 3,724.6 -3,671.3 Fault E 7,794.0 87.0 338.7 3,746.4 -3,693.1 OA-3 Top 7,834.9 86.4 336.7 3,748.7 -3,695.4 OA-3 Top 9,661.4 93.6 293.2 3,746.0 -3,692.7 OA-2 Top 9,809.4 92.3 295.2 3,738.5 -3,685.2 OA-1 Top 10,052.9 91.4 300.1 3,731.5 -3,678.2 OA-1 Top 10,287.0 86.6 303.7 3,734.9 -3,681.6 OA-2 Top 10,441.1 86.3 305.2 3,745.1 -3,691.E OA-3 Top 10,512.6 86.0 305.0 3,750.0 -3,696.7 OA-3 Top 11,039.1 92.9 305.5 3,750.4 -3,697.1 OA-2 Top 11,088.2 92.1 305.2 3,748.2 -3,694.9 _ TD 8 1/2"Borehole 11,344.0 90.3 305.9 3,744.9 -3,691.6 8 1/2"OP08-04L1 P81 Borehole Sidetrack Point 5,830.0 88.0 358.9 3,665.2 -3.r Fault B 5,955.0 90.3 359.5 3,666.8 -3,613.5 I Base OA-Sand 6,040.0 89.6 _ 359.6 3,666.8 -3,613.5 Base OA-Sand 6,220.0 84.9 356.6 3,676.8 -3,623.5 t TD OP08-04L1 PB1 6,550.0 82.7 354.0 3,715.9 -3,662.6 HALIJBURTON ay Or Water and Oil Based Mud Record Q _ 2 o co mo m o O x a o' ° s 9 O ° m m ° v d = a m A , . m ¢ _ ¢ O o m rn F m U LL c m 0 3 m E ._ ._ m m o 0 x 3 ¢ 2i- 0` 0 0 0 6 5 8 E F 3 h m p a a T 2 U ■ . P W A E N N Ui ON V N N 8 m (0 (00 'Oo y 0 0 o - - oO o N oO o0 000 00 00 00 00 00 °o Z m N 0 , cc.. O O O O O o 0 c, U E n rn U E 0- o o w m 0, n n on . . CO v o t rn O o •m ( 3 N N W M N (N N N N : co M 0_ N o N M 7) F,ri M N N N N N N M Q On O O N N o N N C C > Y O_R O, M • p co e 0 0 0 0 0 0 0 Z Z Q - N a Z W F O Q a O. E a Lo I-- r O R N N N r M M N F. Q<C/) J L c6 (" t'' V l7 l7 lM ri M M U 0 J 9 � � . 9 n CO CD v m r n n rn m o V) O. 0. N N N M N N N N N N N N v e - o a' d N e . S. C-, `.i in CO n n n M CO m S. - - �°o co cO iO co ,o m O O 0 a 0 ( rn o °0 v o o m CO N N • S , , , O N r r t0 w r W h W 0p ca of co U co N CN d . . . N N N c N i C C i C C c U 0 U 0 0 0 0 ¢ E C m c2. 19 N s9 co 'n 'n o co N M N co N o r N 8 n r N b m m E , , , C.C. E co- v, v N M (O 00 b O O N N N N N N N N co N K d N N N .-is" c,'"'" O N N V E CC W R' ( N M V o o co V O O Q V N 0 N m 0 o J O v v °ON xQx ¢ ¢ O Q e X O -- .0 = 0 = 0E .- N N NN N O . co N d E-_ CO Y T. 9 ' it ,-'1' A V V 'n 'ti vi O V c c c O W Z Q u U•IA- KOC9m• 2 0O O u, o .- � ; o �_ io � no on Q i 0 n 0 o . . . 1 o o m C uNi o ,or' m C m m m Z <n } 0 U' O O u'1 ,D N N N -J w2 K - o0 a us T a Y n co v o v r' v 'n ,n ,n v v co N U) N a 17 M M 7 a > CO N ,O CO (O N (Oo ,n o ,n co CS p -a 17 L.a) > $ ' , ' 2 > . 00 ntocaaa ,oOo 8 nM r in co r. m o 2 0 Q, a N F o, of N N LL Ol v 3 n m w m 0 3 of of m ci of of of 6 c a) . 0 ,-, ,, ,,, , . M ° U co 0 , - - W d, o a m CO tO 0,, . au . o ,4„., - - CD a0 N 5 O r O O t o o v < , In m S S S d SgggSSSSSSgg�' ? ? ' o � N Cl 0 V '(J D I-L W D ON NN N N C r,,,' HALLIBLIRTON SpA�,.v Bit Record o ❑ I- N r m co o V 3 D C _O T O E 3 - N � 2 O 'O y Q U 1 C O U LL 0 = O N N , ❑ 3 o o a ❑ x , m O o z D 20 X 0 X Q rr m O 5 z 0 o SL = U m oa E M O O O J O LL 4] O Cl CO 0- 0. O O N N a X CO O O U CO C C a ,o Co 0 0 .- L Y J W E O N O -t N -, 7 Z Z Q N ^ Z Q W 0 0 co m o O QE H ¢ E ' °v N Q Q N co . U m c O 0 m o o E N 0 0- N 0 m 06>0 as N M rn Q N o LL r, Cr) r F- 0 0 O m o 3D ' I N r co 0 m 08 O 8 C) W M V LL � L n 3 V a° 0,, to V cn O O v v M 0 rn c co E W s in m m ' O v 8 ° 71. CO❑ v o cr,0 o Q N ° > N N O■ d 05 O O co ci)0 'E m Y oo ro Co O W 2 Z Q m w 0 O 0 0 0 0 2 O U E O a a Q H 0 n ❑ Z 0 } = O n CC J uJ U w a w n o m co � x 1 m 3 o Y m o 8 m To DL N 07 h 0 Z 0 0 0 se 7 O O O Q I s- N al HALLIBURTON Sperry Drilling Morning Report Re ow/#1 :: Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterdays Depth: 11113' Well: OP08-04L1 Daily Charges: N/A Current Depth: 11113' Area: Nikaitchuq Total Charges: N/A 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: TIN w/Bridge Plug Date: 11-Jun-2013 Rig: Nabors 245 Report For: B.Simonson/D.Sherman Time: 11:59 PM ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP(ft/hr) - - - - Flow In(gpm) - SPP(psi) - ---- Flow In(spm) - Gallons/stroke 4.23 @ 96% MWD Summary Depth Tools ECD Avg Min Max 0' to 0' (ppg) N/A N/A N/A r Mud Data Density(ppg) Viscosity MBT PV YP API FL pH Chlorides Cor Solids Depth Mud Type in out (sec/qt) (ppb Eq) cP (Ib/100ft2) ml/30min mg/I % 11113' Brine 8.80 ------- 47500.00 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition Size Set At Type Weight Grade Comments Casing 9.63" 4999' Intermediate 47# N/A Summary 5.50" 11113' Slotted Liner 17 ppf N/A : . :. Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) --------_--- Gas Summary Chromatograph (ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 41 - - - - - - - - Minimum 0 - - - - - - - - Average 2 - - - - - - - Background 0 Trip 41 Connection N/A * 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: Continued to single in on 5"drill pipe with milling assembly. The top of the liner was tagged at 4792'MD. Pumped 18 bbls to fill the hole. Pumped 3 bpm for 10 minutes,and established loss rates-72 bbl/hr dynamic loss rate, 50 bbl/hr static loss rate. Max gas of 41 u was recorded while circulating. Pull-out-of-hole to surface. Rig-up to set bridge plug. Run-in-hole on 5"drill pipe to set plug. Logging Engineers: A.Bongard/J.Failing Report By: A.Bongard Unit Phone: N/A 1 HALLIEU RTOIN Sperry Cavilling Morning Report Report#2 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 11113' Well: OP08-04L1 Daily Charges: N/A Current Depth: 11113' Area: Nikaitchuq Total Charges: N/A 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: Wireline Logs Date: 12-Jun-2013 Rig: Nabors 245 Report For: B. Perry/D.Sherman Time: 11:59 PM ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP ft/hr - - - - Flow In ..m - SPP ssi - ---- Flow In (spm) 0 Gallons/stroke 4.23 @ 96% Death Tools Av. Min Max MWD Summary 0 to 0' ECD (ppg) N/A N/A N/A Mud Data Density(ppg) Viscosity MBT PV YP API FL pH Chlorides Cor Solids Death Mud T .e in out (sec/.t) sib E. cP (Ib/100ft2) ml/30min mg/I 11113' Brine 8.80 8.80 -_-- 49000.00 ����. � �=._ ___ �.w� . _. _ _, �� .�. .. _ -_-__. _ ., Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition Size Set At Type Weight Grade Comments Casing 9.63" 4999' Intermediate 47# N/A Summary 5.50" 11113' Slotted Liner 17 spf N/A Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 0 - - - - - - - - Minimum 0 - - - - - - - - Average 0 - - - - - - - Background 0 Trip N/A Connection N/A " 10,000 Units = 100%Gas In Air (current) (max) lma) 24 hr Recap: TIH on 5"drill pipe with bridge plug. Set plug at 4763'. Monitor well for losses. The hole is static. Trip-out-of-hole. Run-in-hole with wireline and log cased hole. Logging Engineers: A.Bongard/J.Failing Report By: A.Bongard Unit Phone: N/A 1-1ALL1BtJRTON Spearry LSrHhing Morning Report Report#3 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 11113' Well: OP08-04L1 Daily Charges: N/A Current Depth: 11113' Area: Nikaitchuq Total Charges: N/A 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: Prep.to RIH w/Whipstock BHA Date: 13-Jun-2013 Rig: Nabors 245 Report For: B. Perry/D.Sherman Time: 11:59 PM 3 ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP ft/hr - - - - Flow In ••m 0 SPP (•si) - ---- Flow In (spm) - Gallons/stroke 4.23 @ 96% ........... MWD Summary Depth Tools ECD (ppg) Avg Min Max 0' to 0 N/A N/A N/A Mud Data Density(ppg) Viscosity MBT PV YP API FL pH Chlorides Cor Solids Death Mud T .e in out (sec/qt) ••b Es cP (Ib/100ft2) ml/30min mg/I 11113' Brine 8.80 -- ------ Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition Size Set At Type Weight Grade Comments Casing 9.63" 4999' Intermediate 47# N/A Summary 5.50" 11113' Slotted Liner 17 ppf N/A Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 0 - - - - - - - - Minimum 0 - - - - - - - - Average 0 - - - - - - - Background 0 Trip N/A Connection N/A * 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: Pick-up BHA retrieving head and trip-in-hole until the bridge plug is tagged. Retrieve bridge plug and trip-out-of-hole. Fill hole with 2x displacement. Lay down BHA and retrieving head. Clean rig floor and prepare to pick-up BHA. Logging Engineers: A.Bongard/J.Failing Report By: A.Bongard Unit Phone: N/A HALLIELIRTDN 'uptsrry !Drilling Morning Report Report#4 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterdays Depth: 11113' Well: OP08-04L1 Daily Charges: N/A Current Depth: 4388' Area: Nikaitchuq Total Charges: N/A 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: Milling Window Date: 14-Jun-2013 Rig: Nabors 245 Report For: B. Perry/D. Sherman Time: 11:59 PM ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP (ft/hr) 0.0 11.6 33.4 4374' Flow In (gpm) 0 SPP (psi) 464 Flow In (spm) 0 Gallons/stroke 3.55 @ 96% .ci ,a. Depth Tools Avg Min Max MWD Summary o' to 0' Directional ECD (ppg) N/A N/A N/A Mud Data Density(ppg) Viscosity MBT PV YP API FL pH Chlorides Cor Solids Depth Mud Type in out (sec/qt) (ppb Eq) cP (Ib/100ft2) ml/30min mg/I % 4348' Oil 9.20 9.20 60 N/A 13 13 N/A N/A 78500.00 -2.9 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 1 Window Mill 8.5 . :- Size Set At Type Weight Grade Comments Casing 9.63" 4999' Intermediate 47# N/A Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh ' Lst Coal Gvl Tuff Cement (current) Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 29 4376' 3264 10 0 0 0 0 0 Minimum 5 4364' 510 0 0 0 0 0 0 Average 13 1784 5 0 0 0 0 0 Background 0 Trip N/A Connection N/A * 10,000 Units = 100%Gas In Air (current) (max) (max) ,,004 0, 000 000, ..°00 0,0 r ,u. .,.,F ,0 A,. : ., .. „„, .44- ....4-.., : 40,-; .. 3,A.,.a, , . ., i.. 24 hr Recap: Make-up whipstock/watermelon mill assembly BHA. Trip-in-hole with 5"drill pipe at 2 min/std. Run-in-hole to 4399'. Service rig and grease draw works. Orient and set whipstock liner top at 4793'(top of window at 4351'). Displace well to 9.2 ppg OBM. Begin cutting window(bottom of window at 4368'). Drill rat hole to 4388'. Performed FIT test to 11.9 ppg EMW. Logging Engineers: A.Bongard/J. Failing Report By: A.Bongard Unit Phone: (907)685-1490 FIALLIBLIRTC111.1 SpearrY C3rilh,,y Morning Report Report#5 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 4388' Well: OP08-04L1 Daily Charges: N/A Current Depth: 4488' Area: Nikaitchuq Total Charges: N/A 24 Hour Progress: 100' Location: Oliktok Point Rig Activity: BOP Testing Date: 15-Jun-2013 Rig: Nabors 245 Report For: B. Perry/D. Sherman Time: 11:59 PM Y ROP Current Avg 24 hr Max Max @ ft Current Pum• & Flow Data: ROP ft/hr 0.0 23.3 46.9 4388' Flow In •am 0 SPP •si 0 ---- Flow In (spm) 0 Gallons/stroke 3.55 @ 96% MWD Summary Depth Tools ECD (ppg) Min Max 4388 to 4488 Directional N/A N,A N/A Mud Data Density(ppg) Viscosity MBT PV YP API FL arpH Chlorides Cor Solids Death Mud T se in out (sec/qt) ••b E• cP (Ib/100ft2) m1/30min m./I % 4488' OBM 9.20 9.20 50 N/A 12 14 N/A N/A 96000.00 7.9 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 1 Window Mill 8.5 - - 4351' 4488 137' 20.4 79.0 1/1 Size Set At Type Weight rade Comments Casing 9.63" 4999' Intermediate 47# N/A Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 96 4410' 10950 53 11 5 3 0 0 Minimum 13 4430' 5300 31 7 4 0 0 0 Average 46 4446' 5541 29 8 5 3 0 0 Background 0 Trip N/A Connection N/A * 10,000 Units = 100%Gas In Air (current) (max) (max 24 hr Recap: Run-in hole and continue drilling rathole to TD at 4488'(420 gpm at 1000 psi,80 rpm,3-4 k ROT TQ). Circulate one bottoms up at TD. Trip-out-of-hole. Begin to test BOPs. No down-hole fluid losses observed. Logging Engineers: A.Bongard/J. Failing Report By: A.Bongard Unit Phone: (907)685-1490 1-140XLLI9 JRTOI J porry Mr-Ming Morning a Report#6 0 ir ', " it f Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 4488' Well: OP08-04L1 Daily Charges: N/A Current Depth: 4868' Area: Nikaitchuq Total Charges: N/A 24 Hour Progress: 380' Location: Oliktok Point Rig Activity: Drilling Ahead Date: 16-Jun-2013 Rig: Nabors 245 Report For: B. Perry/D. Sherman Time: 11:59 PM ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP ft/hr 0.0 173.0 459.6 4748' Flow In ••m 409 SPP •si 1256 ---- Flow In s•m 115 Gallons/stroke 3.55 @ 96% MWD Summary De•th Tools ECD (ppg)WM Min Max 4488' to 4868' Directional N/A N/A N/A Mud Data Density(ppg) Viscosity MBT PV YP API FL pH Chlorides Cor Solids Death Mud Tyse in out (sec/qt) ••b E• cP (Ib/100ft2) ml/30min m•/I % 4680' OBM 9.20 9.20 55 N/A 15 14 N/A N/A 102500.00 7.6 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 1 Window Mill 8.5 ve 4351' 4488 137' 20.4 79.0 1/1 2 DTX619M-D6 8.5 0.778 - 4488' 4868' 380' m1. Size Set At Type Weight Grade Comments Casing 9.63" 4999' Intermediate 47# N/A Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ---------__- Gas Summary.._ Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 141 4765' 17702 76 30 13 14 4 0 Minimum 4 4490' 678 0 0 0 0 0 0 Average 50 7203 27 10 5 5 0 0 Background 91 Trip 42 Connection N/A * 10,000 Units = 100%Gas In Air (current) (max) lmax 24 hr Recap: Test BOPs. Trip-in-hole with mud motor BHA. Orient motor high-side through window with pumps off. Tag bottom at 4488'MD. Drill ahead to 4868'MD(500 gpm, 140 spm,40 rpm). Circulate 1 bottoms-up,and prepare to pull-out-of-hole. No down-hole fluid losses observed. Logging Engineers: A.Bongard/J. Failing Report By: A.Bongard U ni t Phone: (90 7)685-1490 1-1.41L1BtJRTON Sperry orilerg Morning Report Report#7 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 4868' Well: OP08-04L1 Daily Charges: Current Depth: 4868' Area: Nikaitchuq Total Charges: 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: Cut a slip-Calibrate Blocks Date: 17-Jun-2013 Rig: Nabors 245 Report For: B. Perry/D.Sherman Time: 24:00:00 ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP (ft/hr) Flow In (gpm) SPP (psi) Flow In (spm) Gallons/stroke 3.55 @ 96% MWD Summary Depth Tools ECD (ppg) Avg Min Max 4868' to 4868' N/A N/A N/A Mud Data Density(ppg) Viscosity MBT PV YP API FL pH Chlorides Cor Solids Depth Mud Type in I out (sec/qt) (ppb Eq) cP (Ib/100ft2) ml/30min mg/I % 4868' FazePro 9.20 50 13 14 4.2 99000 6.58 Bit# I Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 Hycalog SKH616M-C7D 8.5 4868' Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' Hydril 563 47.0 L-80 Summary Lithology(%) I Ss Cht Silt Siltst Cly I Clyst I Sh I Lst Coal 1 Gvl 1 I Tuff Cement (current) Gas Summary Chromatograph(ppm) Units" Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 0 0 0 0 0 0 0 Minimum 0 0 0 0 0 0 0 Average 0 0 0 0 0 0 0 Background Trip Connection " 10,000 Units = 100%Gas In Air (current) (max) tmax) 24 hr Recap: Circulate and condition mud prior to POOH. Flow check-static. L/D BHA. P/U BHA#2. P/U 4.5"DP singles and RIH. Slip and cut drill line. Calibrate blocks. Logging Engineers: E.Opitz/J.Failing Report By: E.Opitz Unit Phone: (907)685-1490 I-11/41L1-11:3U RTON Sperry drilling Morning Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 4868' Well: OP08-04L1 Daily Charges: Current Depth: 6206' Area: Nikaitchuq Total Charges: 24 Hour Progress: 1338' Location: Oliktok Point Rig Activity: Drilling Ahead Date: 18-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP ft/hr 124.0 120.1 458.9 5152' Flow In ••m 501 SPP •si 1759 ---- Flow In (spm) 141 Gallons/stroke 3.55 @ 96% Death Tools Avg Min Max MWD Summary 4868' to 6206' Xceed 675, Periscope 675,Telescope 675,ADN6 ECD (ppg) N/A N/A N/A 4 ... v . rb7== Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids Death Mud T ■e in out (sec/qt) Ratio cP (Ib/100ft2) m1/30min Mud (Ib/bbl) 5933' FazePro 9.20 9.20 51 68/32 16 13 5.2 2.65 3.45 8.42 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 H cal°• SKH616M-C7D 8.5" _- 4868' ---- Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' Hydril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ----_------- 2 ¢.` -.. cmcwr..:u«x.rux..'uv3.y.4 ...,. .. ova Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 1722 5753' 185881 958 513 258 264 124 70 Minimum 13 4873' 1360 6 3 1 2 0 0 Average 467 49650 277 164 92 98 50 28 Background 98 Trip Connection * 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: RIH w/BHA#2,working through milled window. Drill ahead to 5290'MD. Perform FIT to 10.6 ppg EMW. Resume drilling ahead. i Logging Engineers: E.Opitz/J. Failing Report By: E.Opitz Unit Phone: (907)685-1490 t-lALLIDU R rcDNJ aperry CSriiiing Morning Report Report#9 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 6206' Well: OP08-04L1 Daily Charges: Current Depth: 6735' Area: Nikaitchuq Total Charges: 24 Hour Progress: 529' Location: Oliktok Point Rig Activity: Drilling Ahead Date: 19-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 ROP Current Avg 24 hr Max Max @ ft Current Pun"• & Flow Data: ROP ft/hr 156.0 195.4 300.9 6507' Flow In •am 505 SPP •si 1841 .r_ ---- Flow In (spm) 143 Gallons/stroke 3.55 @ 96% r MWD Summary Death Tools ECD (ppg) Avg Min Max 6206' to 6735' Xceed 675, Periscope 675,Telescope 675,ADN6 N/A N/A N/A Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids Death Mud T se in out (sec/.t) Ratio cP (Ib/100ft2) m1/30min Mud (Ib/bbl) 0/4 6592' FazePro 9.20 9.20 52 67/33 17 14 5.0 2.50 3.25 7.64 L = Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 Hycalo• SKH616M-C7D 8.5" _- 4868' ---- e Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' Hydril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) -_---------- = Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 1351 6518' 145896 865 472 247 260 122 68 Minimum 48 6599' 4317 26 20 27 33 30 22 Average 488 45929 260 142 82 86 48 29 Background 37 Trip - Connection 414 * 10,000 Units = 100%Gas In Air (current) (max) max 24 hr Recap: Drill ahead to 6550'MD. BROOH to 5818'MD and perform an open hole sidetrack. Successfully kick off and resume drilling ahead. We have been experiencing connection gasses since crossing a possible fault around 6590'MD. Logging Engineers: E.Opitz/J.Failing Report By: E.Opitz Unit Phone: (907)685-1490 11-1ALL1 El RTOIV Sperry ClIrifling Morning Report Report# 10 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 6735' I Well: OP08-04L1 Daily Charges: Current Depth: 8304' Area: Nikaitchuq Total Charges: 24 Hour Progress: 1569' Location: Oliktok Point Rig Activity: Drilling Ahead Date: 20-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 ROP Current Avg 24 hr Max Max @ ft Current Pum• & Flow Data: ROP ft/hr 112.0 164.9 298.6 8188' Flow In ••m 494 SPP •si 1865 ---- Flow In (spm) 139 Gallons/stroke 3.55 @ 96% De.th Tools Av. Min Max MWD Summary 6735' to 8304' Xceed 675, Periscope 675,Telescope 675,ADN6 ECD (ppg) N/A N/A N/A Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids Death Mud Type in out (sec/•t) Ratio cP (Ib/100ft2) ml/30min Mud (lb/bbl) 8018' FazePro 9.10 9.10 49 67/33 16 15 5.1 2.50 3.25 8.08 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 Hycalog SKH616M-C7D 8.5' _- 4868' ---- . ..=.2w , Y, . n 3 1_..„..sase«_7,_ tu sc'4..muay.vu_. - Size Set-At Type Weight Grade Comments Casing 9 5/8" 4999' H dril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 1553 8198' 171255 767 218 138 134 76 41 Minimum 67 7164' 6710 40 23 24 27 23 15 Average 452 43516 214 70 49 51 33 20 Background 104 Trip - Connection 372 * 10,000 Units = 100%Gas In Air (current) (max) (max) =217:71, s 24 hr Recap: Continue to drill ahead to 8304'MD as of midnight. Connection gasses consistently decreased throughout the day, and are no longer occurring/noticible as of 1400hrs/-7800'MD. Logging Engineers: E.Opitz/J. Failing Report By: E.Opitz Unit Phone: (907)685-1490 HALLIBLIRTON Sperry crifhing Morning Report Report# 11 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 8304' Well: OP08-04L1 Daily Charges: Current Depth: 9833' Area: Nikaitchuq Total Charges: 24 Hour Progress: 1529' Location: Oliktok Point Rig Activity: Drilling Ahead Date: 21-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 � . ROP Current Avg 24 hr Max Max @ ft Current Pum. & Flow Data: ROP ft/hr 103.0 171.5 445.2 9451' Flow In ..m 460 SPP .si 1772 ---- Flow In son) 128 Gallons/stroke 3.55 @ 96% MWD Summary Depth Pp9 �� Min Max 8304 to 9833' Xceed 675, Periscope Tools ECD ( )675,Telescope 675,ADN6 N/A N/A N/A �.. Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids Depth Mud Tyse in out (sec/.t) Ratio cP (Ib/100ft2) ml/30min Mud (Ib/bbl) 9642' FazePro 9.10 9.10 48 67/33 15 15 4.8 2.50 3.25 7.88 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 Hycalog SKH616M-C7D 8.5" _- 4868' ---- Size Set At Type Weight rade Comments Casing 9 5/8" 4999' Hydril 563 47.0 L-80 Summary Litho logy(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ n ..+ ��*?;:: z's •..�a�,�, � .. `' .,u:'c-.,...,....:. "°,i.,�.,.,.,® , s." ='w.�'' :..,-' .3 ,..'aaa, ,...g.....:e .�..N» `A„m.��.,.� w._._,.., _..w.. .... ;:;f`' Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 2123 8323' 225287 929 275 174 170 94 50 Minimum 78 8753' 7317 50 25 32 37 33 20 Average 984 90919 409 118 84 86 57 32 Background 136 Trip - Connection - * 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: Continue to drill ahead to 9833'MD as of midnight. Logging Engineers: E.Opitz/J.Failing Report By: E.Opitz Unit Phone: (907)685-1490 F-111AL-L-11123U RTOIN :3r ,r-ry Iri @ing ��---- Morning Report Report#12 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 9833' Well: OP08-04L1 Daily Charges: Current Depth: 11270' Area: Nikaitchuq Total Charges: 24 Hour Progress: 1437' Location: Oliktok Point Rig Activity: Drilling Ahead Date: 22-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP ft/hr 118.0 123.3 237.7 11134' Flow In .•m 452 SPP •si 1887 ---- Flow In (spm) 127 Gallons/stroke 3.55 @ 96% MWD Summar Depth Tools ECD (ppg) Avg Min Max y 9833 to 11270' Xceed 675, Periscope 675,Telescope 675,ADN6 N/A N/A N/A Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids De.th Mud Type in out (sec/.t) Ratio cP (Ib/100ft2) ml/30min Mud (Ib/bbl) % 11026' FazePro 9.10 9.10 48 67/33 15 15 4.5 2.90 3.77 8.18 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 H cal°. SKH616M-C7D 8.5' _- 4868' ---- _ ---.I.2.7 Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' H dril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ r ,: 7 ,..m.. z, Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 1822 11152' 195668 767 233 150 145 81 45 Minimum 28 10220' 2091 13 9 16 19 20 13 Average 522 51416 218 63 50 51 35 20 Background 83 Trip - Connection - * 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: Continue to drill ahead to 11270'MD as of midnight. Logging Engineers: E.Opitz/J.Failing Report By: E.Opitz Unit Phone: (907)685-1490 HALL1BtJRTON np r.Y ortthry Morning Report Report# 13 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 11270' Well: OP08-04L1 Daily Charges: Current Depth: 11344' Area: Nikaitchuq Total Charges: 24 Hour Progress: 74' Location: Oliktok Point Rig Activity: Drilling Ahead Date: 23-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 M.. ROP Current Avg 24 hr Max Max @ ft Current Pum• & Flow Data: ROP ft/hr 116.6 137.2 11274' Flow In ••m _ SPP •si ---- Flow In (spm) _ Gallons/stroke 3.55 @ 96% MWD Summary Depth Tools ECD (ppg) Avg Min Max 11270' to 11344' Xceed 675, Periscope 675,Telescope 675,ADN6 N/A N/A N/A Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids De.th Mud Type in out (sec/.t) Ratio cP (Ib/100ft2) ml/30min Mud (Ib/bbl) 11344' FazePro 9.10 9.10 48 67/33 16 12 na 2.60 3.38 8.22 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 H cal°. SKH616M-C7D 8.5" _- 4868' ---- Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' Hydril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ - . » . _v__ .. ..ate. Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 949 11296' 106703 457 143 98 97 59 31 Minimum 383 11339' 44949 215 73 64 68 45 26 Average 604 62812 284 92 71 72 46 26 Background - Trip 163 Connection - ` 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: Continue to drill ahead to TD of 11344'MD.BROOH per K&M. Logging Engineers: E.Opitz/J. Failing Report By: E.Opitz Unit Phone: (907)685-1490 HALL1BlJRTO1 1 Sperry orrrtrng Morning Report Report# 14 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterdays Depth: 11344' Well: OP08-04L1 Daily Charges: Current Depth: 11344' Area: Nikaitchuq Total Charges: 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: Clean out run Date: 24-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 a. ROP Current Avg 24 hr Max Max @ ft • Current Purr'• & Flow Data: ROP ft/hr ---- Flow In ••m SPP 'Si ---- Flow In(spm) Gallons/stroke 3.55 @ 96% MWD Summary Death Tools ECD (ppg) Avg Min Max 11344' to 11344' N/A N/A N/A Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids Death Mud Type in out (sec/•t) Ratio cP (Ib/100ft2) ml/30min Mud (lb/bbl) 11344' FazePro 9.10 9.10 50 67/33 15 14 na 2.55 3.32 8.22 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 H calog SKH616M-C7D 8.5' _- 4868' ---- Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' H dril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-41 C-4n C-5i C-5n Maximum 0 0 0 0 0 0 0 Minimum 0 0 0 0 0 0 0 Average 0 0 0 0 0 0 0 Background - Trip 357 Connection - * 10,000 Units = 100%Gas In Air (current) (max) (max) x 24 hr Recap: Finish POOH and L/D BHA#2. P/U cleanout BHA and RIH. CBU 3x and pump sweeps per K&M. Displace lateral to SF 9.1 ppg OBM. Logging Engineers: E.Opitz/C.Sinn Report By: E.Opitz Unit Phone: (907)685-1490 1 HALLIBIJRTON Sperry Orffling Morning Report Report#15 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 11344' Well: OP08-04L1 Daily Charges: Current Depth: 11344' Area: Nikaitchuq Total Charges: 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: R/U to retrieve whipstock Date: 25-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 — ROP Current Avg 24 hr Max Max @ ft Current Pum• & Flow Data: ROP ft/hr ---- Flow In ••m SPP •si ---- Flow In (s•m) Gallons/stroke 3.55 @ 96% MWD Summary Depth Tools ECD (ppg) Av. Min Max 11344' to 11344' N/A N/A N/A e Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids Depth Mud Ty se in out (sec/•t) Ratio cP (Ib/100ft2) m1/30min Mud (lb/bbl) % 11344' FazePro 9.10 9.10 52 67/33 30 13 na 2.50 3.25 8.18 Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition 2 Hycalog SKH616M-C7D 8.5" 0.902 67.60 4868' 11344' 6476' 5.0 120.0 1-1-WT-A-X-I-NO-TD „ Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' H dril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 0 0 0 0 0 0 0 Minimum 0 0 0 0 0 0 0 Average 0 0 0 0 0 0 0 Background - Trip - Connection - * 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: TOOH per K&M. Displace casing to 8.8ppg brine. POOH and L/D cleanout BHA. R/U to RIH with liner. Logging Engineers: E.Opitz/C.Sinn Report By: E.Opitz Unit Phone: (907)685-1490 HALLIBURTOIV ,,,. 1 parry oriIIir g Morning Report Report#16 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 11344' Well: OP08-04L1 Daily Charges: Current Depth: 11344' Area: Nikaitchuq Total Charges: 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: R/U for liner run Date: 26-Jun-2013 Rig: _ Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 ROP Current Avg 24 hr Max Max @ ft Current Pum• & Flow Data: ROP ft/hr ---- Flow In ••m SPP •si ---- l Flow In (spm) Gallons/stroke 3.55 @ 96% T MWD Summary Depth Tools ECD (ppg) Av. Min Max 11344' to 11344' N/A N/A N/A Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids De.th Mud T •e in out (sec/it) Ratio cP (Ib/100ft2) ml/30min Mud (Ib/bbl) % 1 1344' KCVNaCI Brine 8.80 36 ----_- Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' H dril 563 47.0 L-80 Summary wTM Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ----_--_---- . Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 0 0 0 0 0 0 0 Minimum 0 0 0 0 0 0 0 Average 0 0 0 0 0 0 0 Background - Trip - Connection - ` 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: RIH with whipstock retrieval tool. Retrieve whipstock,and POOH. L/D whipstock and retrieval BHA. Begin to R/U for liner run. Logging Engineers: E.Opitz/C.Sinn Report By: E.Opitz Unit Phone: (907)685-1490 1-iALLIB[JRTON Sperry o,-,,ling Morning Report Report#1= ii Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterdays Depth: 11344' Well: OP08-04L1 Daily Charges: Current Depth: 11344' Area: Nikaitchuq Total Charges: 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: RIH w/5.5"liner Date: 27-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 I ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP ft/hr ---- Flow In ••m SPP •si ---- Flow In(spm) Gallons/stroke 3.55 @ 96% MWD Summary Depth Tools ECD (ppg) Avg Min Max 11344' to 11344' N/A N/A N/A Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids Depth Mud Type in out (sec/.t) Ratio cP (lb/100f2) m1/30min Mud (Ib/bbl) % 11344' KCI/NaCI Brine 8.80 28 ------ Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition Size Set At Type Weight rade Comments Casing 9 5/8" 4999' H dril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-4i C-4n C-5i C-5n Maximum 0 0 0 0 0 0 0 Minimum 0 0 0 0 0 0 0 Average 0 0 0 0 0 0 0 Background - Trip - Connection - * 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: RIH with 5.5"liner to 7162'MD. R/D casing equipment. R/U bails and 5"elevator. Logging Engineers: E.Opitz/C.Sinn Report By: E.Opitz Unit Phone: (907)685-1490 I-iALLI BURTON Sperry oriIIIrg -- Morning Report Report# 18 Customer: ENI Petroleum Job No.: AK-AM-0900489693 Yesterday's Depth: 11344' Well: OP08-04L1 Daily Charges: Current Depth: 11344' Area: Nikaitchuq Total Charges: 24 Hour Progress: 0' Location: Oliktok Point Rig Activity: L/D DP Date: 28-Jun-2013 Rig: Nabors 245 Report For: B. Perry/C. Ruminer Time: 24:00:00 ROP Current Avg 24 hr Max Max @ ft Current Pump & Flow Data: ROP ft/hr ---- Flow In ..m SPP • ---- Flow In (spm) Gallons/stroke 3.55 @ 96% MWD Summary Death Tools ECD (ppg)M' Min Max 11344' to 11344' N/A N/A N/A Mud Data Density(ppg) Viscosity Oil/Water PV YP API FL Alkal Lime Cor Solids Death Mud Type in out (sec/qt) Ratio cP (Ib/100ft2) m1/30min Mud (1b/bbl) 11344' KCVNaCI Brine 8.80 28 ------ Bit# Bit Type Size TFA Hours Depth in/out Footage WOB RPM Condition Size Set At Type Weight Grade Comments Casing 9 5/8" 4999' H dril 563 47.0 L-80 Summary Lithology(%) Ss Cht Silt Siltst Cly Clyst Sh Lst Coal Gvl Tuff Cement (current) ------------ z. Gas Summary Chromatograph(ppm) Units* Depth C-1 C-2 C-3 C-41 C-4n C-51 C-5n Maximum 0 0 0 0 0 0 0 Minimum 0 0 0 0 0 0 0 Average 0 0 0 0 0 0 0 Background - Trip - Connection - * 10,000 Units = 100%Gas In Air (current) (max) (max) 24 hr Recap: Finish POOH and L/D DP. 1 Logging Engineers: E.Opitz/C.Sinn Report By: E.Opitz Unit Phone: (907)685-1490 HALLIBURTON I Sperry Drilling WELL INFORMATION Customer : Eni Petroleum Survey Report Well Name : OP08-04L1 Job Number : AK-XX-0900489693 Rig Name : Nabors 245E Field Name : Nikaitchuq Rig Name : Nabors 245E DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E Measured Depth Inclination Direction Vertical Depth Latitude Departure Vertical Section Dogleg (ft) (deg) (deg) (ft) (ft) (ft) (ft) (°/100'} 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 112.50 0.09 63.88 112.50 0.04 N 0.08 E 0.01 0.08 172.58 0.89 345.74 172.58 0.51 N 0.01 E 0.48 1.46 203.04 1.78 351.99 203.03 1.21 N 0.12 W 1.18 2.96 275.61 4.14 3.54 275.50 4.94 N 0.11 W 4.68 3.34 366.81 5.92 2.63 366.34 12.93 N 0.31 E 12.04 1.95 459.65 5.56 8.23 458.72 22.16 N 1.17 E 20.43 0.72 551.95 6.07 10.29 550.54 31.39 N 2.68 E 28.59 0.60 644.69 7.82 7.64 642.60 42.46 N 4.40 E 38.41 1.92 740.49 10.41 3.34 737.18 57.57 N 5.77 E 52.14 2.79 834.52 11.23 4.18 829.54 75.18 N 6.93 E 68.30 0.89 896.64 12.19 0.85 890.37 87.77 N 7.47 E 79.95 1.89 993.08 15.23 1.43 984.05 110.62 N 7.94 E 101.27 3.16 1089.72 20.29 3.07 1,076.05 140.06 N 9.15 E 128.52 5.26 1186.30 23.64 5.10 1,165.61 176.08 N 11.77 E 161.49 3.56 1280.07 27.26 4.13 1,250.27 216.24 N 14.99 E 198.13 3.89 1376.83 31.29 2.92 1,334.65 263.46 N 17.87 E 241.53 4.21 1473.10 31.28 3.90 1,416.93 313.36 N 20.84 E 287.42 0.53 1568.21 29.94 3.20 1,498.78 361.69 N 23.84 E 331.83 1.46 1664.79 29.68 2.06 1,582.58 409.65 N 26.05 E 376.15 0.65 1758.88 30.20 1.45 1,664 12 456.59 N 27.48 E 419.78 0.64 1854.17 28.32 359.98 1,747.25 503.15 N 28.08 E 463.34 2.11 1950.91 32.86 0.14 1,830.50 552.37 N 28.14 E 509.59 4.69 2047.04 32.37 359.05 1,911.47 604.18 N 27.78 E 558.41 0.80 2141.98 33.35 355.26 1,991.23 655.61 N 25.20 E 607.62 2.40 2239.16 33.55 353.31 2,072.32 708.90 N 19.86 E 659.54 1.12 2261.41 33.62 352.61 2,090.85 721.12 N 18.35 E 671.53 1.77 2370.73 34.15 353.22 2,181.60 781.60 N 10.84 E 730.95 0.58 ' 2466.56 35.11 352.80 2,260.46 835.65 N 4.21 E 784.02 1.03 2562.74 35.64 352.58 2,338.88 890.88 N 2.88 W 838.35 0.57 2658.81 35.04 350.96 2,417.25 945.87 N 10.83 W 892.75 1.16 2754.05 31.92 349.54 2,496.68 997.65 N 19.69 W 944.44 3.38 Job No: AK-XX-0900489693 Well Name: OP08-04L1 Survey Report INSITE V7.4.20 Page 1 HALLIBURTON I SPe-ry orWing DIRECTIONAL SURVEY DATA Measured Depth Inclination Direction Vertical Depth Latitude Departure Vertical Section Dogleg (ft) (deg) (deg) (ft) (ft) (ft) (ft) (°/100') 2850.42 30.82 349.21 2,578.96 1,046.95 N 28.94 W 993.94 1.16 2945.98 30.94 347.58 2,660.97 1,094.99 N 38.81 W 1042.47 0.88 3041.17 30.57 348.70 2,742.78 1,142.63 N 48.82 W 1090.66 0.72 3135.73 33.30 351.48 2,823.02 1,191.89 N 57.37 W 1139.88 3.28 3232.13 37.41 356.13 2,901.64 1,247.31 N 63.28 W 1193.99 5.09 3327.35 40.37 358.52 2,975.75 1,307.01 N 66.02 W 1251.04 3.48 3424.14 42.94 359.44 3,048.06 1,371.33 N 67.16 W 1311.88 2.73 3519.23 47.25 359.57 3,115.18 1,438.66 N 67.74 W 1375.36 4.53 3612.98 51.26 359.25 3,176.35 1,509.67 N 68.47 W 1442.36 4.29 3710.84 54.29 357.85 3,235.55 1,587.55 N 70.46 W 1516.24 3.30 3806.86 57.54 0.59 3,289.36 1,667.05 N 71.51 W 1591.32 4.13 3902.39 60.86 358.94 3,338.27 1,749.09 N 71.87 W 1668.55 3.78 3998.42 64.05 0.06 3,382.68 1,834.22 N 72.60 W 1748.82 3.48 4094.17 67.10 358.70 3,422.27 1,921.38 N 73.55 W 1831.07 3.44 4189.87 68.37 356.14 3,458.53 2,009.84 N 77.55 W 1915.58 2.81 4285.68 69.74 354.03 3,492.78 2,098.98 N 85.22 W 2001.99 2.50 4358.99 71.52 356.00 3,517.10 2,167.87 N 91.22 W 2068.79 3.51 4418.52 70.06 358.00 3,536.69 2,224.01 N 94.17 W 2122.56 4.01 4506.19 72.78 2.00 3,564.63 2,307.08 N 94.15 W 2200.64 5.32 4602.02 77.04 5.00 3,589.58 2,399.40 N 88.48 W 2285.47 5.38 4698.07 81.95 6.00 3,607.08 2,493.37 N 79.42 W 2370.71 5.21 4793.64 86.23 9.50 3,616.92 2,587.53 N 66.60 W 2454.83 5.77 4888.38 86.27 11.31 3,623.12 2,680.51 N 49.52 W 2536.40 1.91 4984.44 87.04 11.86 3,628.73 2,774.45 N 30.26 W 2618.12 0.98 5079.55 90.24 9.74 3,630.98 2,867.83 N 12.45 W 2699.81 4.04 5175.39 86.44 7.20 3,633.76 2,962.56 N 1.66 E 2784.04 4.77 5272.52 86.63 4.54 3,639.63 3,059.00 N 11.57 E 2871.29 2.74 5368.27 88.31 3.42 3,643.86 3,154.42 N 18.21 E 2958.72 2.11 5463.66 87.73 2.23 3,647.15 3,249.63 N 22.91 E 3046.61 1.39 5559.28 87.03 0.47 3,651.52 3,345.12 N 25.16E 3135.59 1.98 I 5653.43 86.70 359.82 3,656.67 3,439.13 N 25.40 E 3223.87 0.77 5749.28 87.16 358.82 3,661.81 3,534.83 N 24.26 E 3314.22 1.15 5846.07 87.09 358.57 3,666.66 3,631.48 N 22.06 E 3405.81 0.27 5940.63 87.72 359.22 3,670.94 3,725.92 N 20.24 E 3495.20 0.96 6037.15 89.13 355.81 3,673.60 3,822.30 N 16.05E 3587.22 3.82 6131.52 90.74 353.55 3,673.70 3,916.25 N 7.30 E 3678.51 2.94 6227.08 90.85 354.68 3,672.38 4,011.30 N 2.49 W 3771.19 1.19 6322.66 89.53 355.38 3,672.06 4,106.51 N 10.77 W 3863.52 1.56 6418.64 89.71 356.10 3,672.70 4,202.23 N 17.90 W 3955.91 0.77 6514.08 88.50 356.50 3,674.19 4,297.45 N 24.06 W 4047.52 1.34 6609.34 86.24 356.12 3,678.56 4,392.41 N 30.18 W 4138.87 2.41 6703.67 85.60 355.85 3,685.27 4,486.27 N 36.77 W 4229.34 0.74 6799.83 85.73 355.85 3,692.54 4,581.90 N 43.71 W 4321.59 0.14 6894.61 84.57 357.05 3,700.55 4,676.16 N 49.56 W 4412.18 1.76 6991.38 87.90 357.72 3,706.91 4,772.60 N 53.96 W 4504.34 3.51 Job No: AK-XX-0900489693 Well Name: OP08-04L1 Survey Report INSITE V7.4.20 Page 2 HALLIBURTON I Sperry Drilling DIRECTIONAL SURVEY DATA i Measured Depth Inclination Direction Vertical Depth Latitude Departure Vertical Section Dogleg (ft) (deg) (deg) (ft) (ft) (ft) (ft) (°1100') '• 7086.44 88.45 356.65 3,709.93 4,867.50 N 58.63 W 4595.13 1.27 7181.93 86.56 357.87 3,714.09 4,962.78 N 63.19 W 4686.25 2.36 7278.40 84.80 357.65 3,721.36 5,058.90 N 66.95 W 4777.87 1.84 7374.64 86.56 356.51 3,728.61 5,154.74 N 71.84 W 4869.62 2.18 7469.52 86.86 353.85 3,734.05 5,249.12 N 79.80 W 4961.05 2.82 7566.67 87.88 351.23 3,738.51 5,345.34 N 92.40 W 5055.79 2.89 7662.96 88.61 347.97 3,741.46 5,439.99 N 109.77 W 5150.68 3.47 7758.64 87.54 340.42 3,744.68 5,531.93 N 135.80 W 5245.99 7.97 7854.33 86.09 335.76 3,750.00 5,620.54 N 171.43 W 5341.45 5.09 7949.74 86.74 333.60 3,755.97 5,706.61 N 212.16 W 5436.25 2.36 8045.52 88.21 332.23 3,760.19 5,791.80 N 255.72 W 5531.19 2.10 8141.02 90.03 331.97 3,761.65 5,876.19 N 300.40 W 5625.76 1.93 8234.86 89.94 330.41 3,761.68 5,958.41 N 345.62 W 5718.48 1.67 8331.83 89.78 327.34 3,761.91 6,041.41 N 395.74 W 5813.60 3.17 8427.33 88.69 324.14 3,763.19 6,120.32 N 449.49 W 5906.12 3.54 8521.83 89.50 321.82 3,764.68 6,195.76 N 506.38 W 5996.44 2.60 8617.96 90.43 319.47 3,764.74 6,270.08 N 567.33 W 6087.11 2.63 8712.62 90.70 316.59 3,763.81 6,340.45 N 630.62 W 6174.86 3.06 8807.47 91.09 313.74 3,762.32 6,407.70 N 697.48 W 6260.89 3.03 8903.74 90.90 311.08 3,760.65 6,472.61 N 768.55 W 6346.16 2.77 9000.86 90.80 308.43 3,759.21 6,534.71 N 843.20 W 6430.01 2.73 9094.85 89.27 301.93 3,759.15 6,588.83 N 919.97 W 6507.09 7.10 9189.10 90.95 300.59 3,758.97 6,637.73 N 1,000.54 W 6580.56 2.28 9286.76 90.47 298.98 3,757.76 6,686.24 N 1,085.29 W 6655.08 1.72 9381.00 91.64 296.80 3,756.03 6,730.31 N 1,168.56 W 6724.93 2.62 9476.75 90.39 293.36 3,754.33 6,770.89 N 1,255.25 W 6792.66 3.82 9572.70 93.27 292.96 3,751.27 6,808.60 N 1,343.42 W 6858.21 3.03 9669.20 93.57 293.26 3,745.51 6,846.41 N 1,432.01 W 6923.99 0.44 9764.13 92.55 294.61 3,740.44 6,884.86 N 1,518.65 W 6989.71 1.78 9860.25 92.03 295.82 3,736.60 6,925.78 N 1,605.54 W 7057.83 1.37 9956.55 91.29 297.75 3,733.81 6,969.16 N 1,691.47 W 7127.93 2.15 10049.27 91.42 300.03 3,731.62 7,013.94 N 1,772.62 W 7197.73 2.46 10145.84 90.27 302.36 3,730.20 7,063.95 N 1,855.21 W 7272.93 2.69 10240.50 87.12 303.04 3,732.35 7,115.06 N 1,934.84 W 7348.16 3.40 10341.14 85.99 304.43 3,738.40 7,170.85 N 2,018.38 W 7429.11 1.78 10436.83 86.29 305.21 3,744.84 7,225.37 N 2,096.76 W 7507.10 0.87 10532.33 85.86 304.91 3,751.38 7,280.10 N 2,174.75 W 7585.17 0.55 10628.06 87.39 304.51 3,757.01 7,334.51 N 2,253.30 W 7663.13 1.65 10724.14 89.96 305.34 3,759.23 7,389.50 N 2,332.05 W 7741.70 2.81 10817.91 89.75 305.14 3,759.47 7,443.60 N 2,408.63 W 7818.69 0.31 10915.61 92.96 305.14 3,757.16 7,499.81 N 2,488.50 W 7898.79 3.29 11010.67 93.35 305.71 3,751.93 7,554.83 N 2,565.84 W 7976.90 0.73 11106.38 91.85 305.13 3,747.59 7,610.24 N 2,643.75 W 8055.58 1.68 11200.60 90.45 304.35 3,745.70 7,663.92 N 2,721.16 W 8132.46 1.70 11277.48 90.30 304.22 3,745.19 7,707.22 N 2,784.68 W 8194.85 0.26 Job No: AK-XX-0900489693 Well Name: OP08-04L1 Survey Report INSITE V7.4.20 Page 3 HALLIBJRTON spePr f '^e r z a DIRECTIONAL SURVEY DATA Measured Depth Inclination Direction Vertical Depth Latitude Departure Vertical Section Dogleg (ft) (deg) (deg) (ft) (ft) (ft) (ft) (°/100') 11344.00 90.29 305.91 3,744.85 7,745.44 N 2,839.13 W 8249.35 2.54 DIRECTIONAL SURVEY DATA NOTES -Calculation based on minimum curvature method. -Survey coordinates relative to well system reference point. -TVD values given relative to drilling measurement point. -Vertical section relative to well head. -Vertical section is computed along a direction of 340.04 degrees(True) -A total correction of 19.85 deg from Magnetic north to True north has been applied -Horizontal displacement is relative to the well head. -Horizontal displacement(closure)at 11,344.00 feet is 8,249.39 feet along 339.87 degrees(True) WARRANTY HALLIBURTON ENERGY SERVICES, INC.WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF,AND INCIDENT TO,THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC.CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING,COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE,DRILLING RIG OR ITS CREW OR ANY THIRD PARTY.THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING,COMPLETION,AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO,THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE,WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC.SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT,SPECIAL OR CONSEQUENTIAL DAMAGES,RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. Job No: AK-XX-0900489693 Well Name: OP08-04L1 Survey Report INSITE V7.4.20 Page 4 HALLIBURTON ( Sperry Drilling WELL INFORMATION Customer : Eni Petroleum Survey Report Well Name : OP08-04L1 PB1 Job Number : AK-XX-0900489693 Rig Name : Nabors 245E Field Name : Nikaitchuq Rig Name : Nabors 245E ''IRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E Measured Depth Inclination Direction Vertical Depth Latitude Departure Vertical Section Dogleg (ft) (deg) (deg) (ft) (ft) (ft) (ft) (°I100) 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 40.00 0.03 63.88 40.00 0.00 N 0.01 E 0.00 0.07 112.50 0.09 63.88 112.50 0.04 N 0.08 E 0.01 0.08 172.58 0.89 345.74 172.58 0.51 N 0.01 E 0.48 _ 1.46 203.04 1.78 351.99 203.03 1.21 N 0.12 W 1.18 2.96 275.61 4.14 3.54 275.50 4.94 N 0.11 W 4.68 3.34 366.81 5.92 2.63 366.34 12.92 N 0.30 E 12.04 1.95 459.65 5.56 8.23 458.72 22.16 N 1.17 E 20.43 0.72 551.95 6.07 10.29 550.54 31.39 N 2.68 E 28.59 0.60 644.69 7.82 7.64 642.60 42.46 N 4.39 E 38.41 1.92 740.49 10.41 3.34 737.18 57.57 N 5.77 E 52.14 2.79 834.52 11.23 4.18 829.54 75.18 N 6.93 E 68.30 0.89 896.64 12.19 0.85 890.37 87.77 N 7.47 E 79.95 1.89 993.08 15.23 1.43 984.05 110.62 N 7.93 E 101.27 3.16 1089.72 20.29 3.07 1,076.05 140.06 N 9.15 E 128.52 5.26 1186.30 23.64 5.10 1,165.61 176.08 N 11.77E 161.49 3.56 1280.07 27.26 4.13 1,250.27 216.24 N 14.99 E 198.13 3.89 1376.83 31.29 2.92 1,334.65 263.45 N 17.86 E 241.53 4.21 1473.10 31.28 3.90 1,416.93 313.36 N 20.84 E 287.42 0.53 1568.21 29.94 3.20 1,498.78 361.69 N 23.84 E 331.83 1.46 1664.79 29.68 2.06 1,582.58 409.65 N 26.05 E 376.15 0.65 1758.88 30.20 1.45 1,664.12 456.59 N 27.48 E 419.78 0.64 1854.17 28.32 359.98 1,747.25 503.15 N 28.08 E 463.34 2.11 1950.91 32.86 0.14 1,830.50 552.37 N 28.14 E 509.59 4.69 2047.04 32.37 359.05 1,911.47 604.18 N 27.77 E 558.41 0.80 2141.98 33.35 355.26 1,991.23 655.61 N 25.20 E 607.62 2.40 2239.16 33.55 353.31 2,072.32 708.90 N 19.86 E 659.54 1.12 2261.41 33.62 352.61 2,090.85 721.12 N 18.35 E 671.53 1.77 2333.00 33.97 353.01 2,150.34 760.62 N 13.37 E 710.37 0.58 2370.73 34.15 353.22 2,181.60 781.60 N 10.84 E 730.95 _ 0.57 2466.56 35.11 352.80 2,260.45 835.65 N 4.21 E 784.02 1.03 2562.74 35.64 352.58 2,338.88 890.88 N 2.88 W 838.35 0.57 Job No: AK-XX-0900489693 Well Name: OP08-04L1 PB1 Survey Report INSITE V7.4.20 Page 1 HALLIBURTON I Sperry Drilling DIRECTIONAL SURVEY DATA Measured Depth Inclination Direction Vertical Depth Latitude Departure Vertical Section Dogleg (ft) (deg) (deg) (ft) (ft) (ft) (ft) (°/100') 2658.81 35.04 350.96 2,417.25 945.87 N 10.83 W 892.75 1.16 2754.05 31.92 349.54 2,496.68 997.65 N 19.70 W 944.45 3.38 2850.42 30.82 349.21 2,578.96 1,046.96 N 28.94 W 993.95 1.16 2945.98 30.94 347.58 2,660.97 1,094.99 N 38.81 W 1042.47 0.88 3041.17 30.57 348.70 2,742.78 1,142.63 N 48.82 W 1090.66 0.72 3135.73 33.30 351.48 2,823.02 1,191.89 N 57.38 W 1139.88 3.28 3232.13 37.41 356.13 2,901.64 1,247.31 N 63.28 W 1193.99 5.09 3327.35 40.37 358.52 2,975.75 1,307.01 N 66.03 W 1251.04 3.48 3424.14 42.94 359.44 3,048.06 1,371.33 N 67.16 W 1311.88 2.73 3519.23 47.25 359.57 3,115.17 1,438.66 N 67.74 W 1375.37 4.53 3612.98 51.26 359.25 3,176.35 1,509.67 N 68.48 W 1442.36 4.29 3710.84 54.29 357.85 3,235.55 1,587.55 N 70.47 W 1516.25 3.30 3806.86 57.54 0.59 3,289.36 1,667.05 N 71.51 W 1591.32 4.13 3902.39 60.86 358.94 3,338.27 1,749.09 N 71.87 W 1668.56 3.78 3998.42 64.05 0.06 3,382.67 1,834.22 N 72.60 W 1748.82 3.48 4094.17 67.10 358.70 3,422.26 1,921.38 N 73.56 W 1831.07 3.44 4189.87 68.37 356.14 3,458.53 2,009.84 N 77.55 W 1915.59 2.81 4358.99 71.52 356.00 3,516.52 2,168.31 N 88.44 W 2068.26 1.86 4418.52 70.06 358.00 3,536.10 2,224.45 N 91.39 W 2122.02 4.01 • 4506.19 72.78 2.00 3,564.05 2,307.52 N 91.36 W 2200.10 5.32 4602.02 77.04 5.00 3,588.99 2,399.84 N 85.69 W 2284.93 5.38 4698.07 81.95 6.00 3,606.50 2,493.81 N 76.64 W 2370.17 5.21 4793.64 86.23 9.50 3,616.34 2,587.97 N 63.81 W 2454.29 5.77 4888.38 86.27 11.31 3,622.54 2,680.95 N 46.74 W 2535.86 1.91 4984.44 87.04 11.86 3,628.14 2,774.89 N 27.48 W 2617.58 0.98 5079.55 90.24 9.74 3,630.40 2,868.27 N 9.67 W 2699.28 4.04 5175.39 86.44 7.20 3,633.18 2,963.00 N 4.44 E 2783.50 4.77 5272.52 86.63 4.54 3,639.05 3,059.43 N 14.35 E 2870.76 2.74 5368.27 88.31 3.42 3,643.28 3,154.86 N 20.99 E 2958.18 2.11 5463.66 87.73 2.23 3,646.57 3,250.07 N 25.69 E 3046.07 1.39 5559.28 87.03 0.47 3,650.94 3,345.56 N 27.94 E 3135.06 1.98 5653.43 86.70 359.82 3,656.09 3,439.57 N 28.18 E 3223.34 0.77 5749.28 87.16 358.82 3,661.23 3,535.27 N 27.04 E 3313.68 1.15 5845.26 88.21 358.93 3,665.10 3,631.15 N 25.16 E 3404.45 1.10 5940.03 90.38 359.51 3,666.27 3,725.90 N 23.87 E 3493.94 2.37 6036.92 89.67 359.62 3,666.23 3,822.79 N 23.14 E 3585.26 0.74 6133.52 86.38 358.80 3,669.55 3,919.31 N 21.81 E 3676.44 3.51 6226.06 84.74 356.46 3,676.72 4,011.48 N 17.99 E 3764.37 3.08 6321.22 83.54 353.40 3,686.44 4,105.76 N 9.63E 3855.84 3.44 6416.42 82.38 353.71 3,698.10 4,199.64 N 0.97 W 3947.71 1.26 6482.83 82.68 353.97 3,706.74 4,265.11 N 8.04 W 4011.65 0.60 6550.00 82.68 353.97 3,715.30 4,331.36 N 15.04 W 4076.32 0.00 Job No: AK-XX-0900489693 Well Name: OP08-04L1 PB1 Survey Report INSITE V7.4.20 Page 2 HALLIBURTON Sperry Drilling DIRECTIONAL SURVEY DATA NOTES -Calculation based on minimum curvature method. -Survey coordinates relative to well system reference point. -TVD values given relative to drilling measurement point. -Vertical section relative to well head. -Vertical section is computed along a direction of 340.04 degrees(True) -A total correction of 19.85 deg from Magnetic north to True north has been applied -Horizontal displacement is relative to the well head. -Horizontal displacement(closure)at 6,550.00 feet is 4,331.39 feet along 359.80 degrees(True) WARRANTY HALLIBURTON ENERGY SERVICES, INC.WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF,AND INCIDENT TO,THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC.CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING,COMPLETION, PRODUCTION,OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE,DRILLING RIG OR ITS CREW OR ANY THIRD PARTY.THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING,COMPLETION,AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO,THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE,WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC.SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT,SPECIAL OR CONSEQUENTIAL DAMAGES,RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. Job No: AK-XX-0900489693 Well Name: OP08-04L1 PB1 Survey Report INSITE V7.4.20 Page 3