Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-128MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, August 29, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Adam Earl P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Eni US Operating Co. Inc. SI11-FN6 NIKAITCHUQ SI11-FN6 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 08/29/2022 SI11-FN6 50-629-23499-00-00 213-128-0 W SPT 3928 2131280 1500 3 3 3 3 150 250 240 240 OTHER P Adam Earl 8/3/2022 MIT_IA post patch 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:NIKAITCHUQ SI11-FN6 Inspection Date: Tubing OA Packer Depth 706 1660 1624 1616IA 45 Min 60 Min Rel Insp Num: Insp Num:mitAGE220803173137 BBL Pumped:3.3 BBL Returned:3.2 Monday, August 29, 2022 Page 1 of 1 9 9 9 9 9 9 9 9 9 post patch James B. Regg Digitally signed by James B. Regg Date: 2022.08.29 15:19:33 -08'00' CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: SI11-FN6 (PTD# 213-128) TxIA Communication Date:Wednesday, May 25, 2022 3:01:22 PM Attachments:image003.png From: Lopez Keith <Keith.Lopez@eni.com> Sent: Wednesday, May 25, 2022 11:52 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Hart David <David.Hart@eni.com>; Giraud Hector <Hector.Giraud@eni.com>; Rupert Stephanie <Stephanie.Rupert@eni.com>; Pierfelici Stefano <Stefano.Pierfelici@eni.com>; Lyden Dan <Dan.Lyden@eni.com>; Dexheimer Stephen <Stephen.Dexheimer@eni.com>; Morgan Michael <Mike.Morgan@eni.com>; Zuber Joshua <Joshua.Zuber@eni.com>; Burgess Larry <Larry.Burgess@eni.com>; Lopez Keith <Keith.Lopez@eni.com>; Betts Eric <Eric.Betts@external.eni.com>; Tredway Tommy <Tommy.Tredway@eni.com> Subject: SI11-FN6 (PTD# 213-128) TxIA Communication Mr. Wallace, Today (05-25-22), ENI noticed a concern with tubing by inner annulus communication on SI11-FN6. The IA pressure increased from 14 psi to 587 psi over a 5 hour period. The injector will be shut in and remain shut in until further diagnostics can be conducted with slickline/eline. SI11-FN6 past its last 4-year MIT on 05/01/21. Please let me know of any concerns or further data the AOGCC requires. Thank you. Keith Lopez Senior Production Engineer Eni Petroleum, Alaska 3700 Centerpoint Drive, Suite 500 Anchorage, AK 99503 Direct 907-865-3316 Mobile 907-903-5432 Keith.Lopez@eni.com ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Message for the recipient only, if received in error, please notify the sender and read http://www.eni.com/disclaimer/ ITi�1):7_�►11711u l TO: Jim Regg (�_ - r P.I. Supervisor j 5`.,a(viz-4 FROM: Guy Cook Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 5, 2021 SUBJECT: Mechanical Integrity Tests Ent US Operating Company Inc. SII I-FN6 NIKAITCHUQ SII I-FN6 Sre: Inspector Reviewed By: P.I. Sup" .UP— Comm Well Name NIKAITCHUQ SII I-FN6 API Well Number 50-629-23499-00-00 Permit Number: 213-128-0 Insp Num: mitGDC210501112107 Rel Insp Num: Inspector Name: Guy Cook Inspection Date: 5/1/2021 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well Sln 3828 - IType Inl w •TVD ''Tubing 537 - 537 - s37 - say—� _FN6 PTT 2131280 Type Test SPT Test psi 1500 IA 833 Ing 77 _ nas BBL Pumped 24 BBL Returned: 26 OA 140 - 200 �_ ! 200 - 200 Interval 4vRTST P/F P �✓ Notes: Testing done with a triplex pump, calibrated gauges and a bleed trailer. Wednesday, May 5, 2021 Page I of I • S MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,December 28,2016 TO: P.I.Jm Regg Z(3 ( SUBJECT: Mechanical Integrity Tests PSupervisor �'j� �1 (v g tY ll ENI US OPERATING CO INC SII 1-FN6 FROM: Jeff Jones NIKAITCHUQ SI11-FN6 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry J --- NON-CONFIDENTIAL Comm Well Name NIKAITCHUQ SI11-FN6API Well Number 50-629-23499-00-00 Inspector Name: Jeff Jones Permit Number: 213-128-0 Inspection Date: 12/10/2016 Insp Num: mitJJl61213202021 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well SII l-FN6 7T a In' T w TVD 3928 ' Tubing I 165 165 1 165 - 165 2131280 4- PTD Type Test!SPT 1Test psi 1500 IA 443 1655 -i 1642 - 1636 - Interval 4YRTST Pj' P ✓ OA 220 370 370 370 Notes: 3.3 barrels diesel pumped. 1 well inspected,no exeptions noted. SCANNED AN 0 6 2U1 . Wednesday,December 28,2016 Page 1 of 1 Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Doyon 15 Date: February 22, 2014 Surface Data Logging End of Well Report SI11-FN6 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Show Reports 7. Mud Record 8. Bit Record 9. Morning Reports 10. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Doyon 15 Well: SI11-FN6 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-629-23499-00-00 Sperry Job Number: AK-AM-0900966765 Job Start Date: 18 Jan 2014 Spud Date: 20 Jan 2014 Total Depth: 21358’ MD, 3923’ TVD North Reference: True Declination: 19.498° Dip Angle: 81.051° Total Field Strength: 57628.956 nT Date Of Magnetic Data: 10 December 2013 Wellhead Coordinates N: North 70° 33’ 28.08” Wellhead Coordinates W: West 149° 54’ 15.93“ Drill Floor Elevation 53.93’ Ground Elevation: 13.10’ Permanent Datum: Mean Sea Level SDL Engineers: Leigh Ann Rasher, Kori Jo Plowman, Jade Miller SDL Sample Catchers: David Durst, Julia Ruth Company Geologist: Andrew Buchanan Company Representatives: Mike Ross, Jack Keener SSDS Unit Number: 110 DAILY SUMMARY 01/18/2014 Continue rig move operations. 01/19/2014 Complete rig move operations and spot Sperry SDL unit. Mudloggers rig up unit and calibrate gas equipment. Nipple up BOP and test BOP per Vetco Grey representative. Weld spacer pup for diverter and load drill pipe into pipe shed. Pressure test suitcase lines and begin to transfer mud into pits. Dummy run 13 3/8” hanger. Install diverter pup and continue to nipple up BOP. 01/20/2014 Pick up cleanout BHA and clean out conductor. Lay down cleanout BHA and pick up BHA #2. Spudded well and continued to drill ahead to 303’ MD. Pull out of hole due to gyro pulse issues. Lay down BHA #2 and begin to pick up BHA #3. Gas: The max gas was 8 units at 273’ MD and the average gas was 6 units. Geology: No samples collected during surface section. 01/21/2014 Continue to pick up BHA #3 and run in the hole to 303’ MD. Drill ahead in surface section to 1625’ MD. Rig experiencing Canrig Rigwatch issues. Gas: The max gas was 88 units at 1604’ MD and the average gas was 16 units. Geology: No samples collected during surface section. 01/22/2014 Continue to drill ahead from 1625’ MD to surface TD of 2881’ MD. Circulate bottoms up two times. Begin to backream out of hole. Gas: The max gas was 448 units at 1625’ MD and the average gas was 109 units. Geology: No samples collected during surface section. 01/23/2014 Continue to backream out of hole. Lay down BHA #3 and rig up casing equipment. Run in hole with 13 3/8” casing to 2871’ MD. Circulate and condition mud. Prepare to cement casing. Gas: The max gas was 194 units while tripping in the hole. 01/24/2014 Continue to circulate and condition mud. Cement surface casing and rig down cement equipment. Nipple down the diverter and nipple up BOP. Rig up and perform body test on bag and choke. Gas: The max gas was 134 units while cementing. 01/25/2014 Rig down test equipment. Service traveling equipment and drawworks. Pick up 5” drill pipe. Test BOP. Failed test on choke HCR. Continue to pick up 5” drill pipe. Gas: No gas data. 01/26/2014 Continue to pick up 5” drill pipe. Pick up BHA #4. Run in hole to 1650’ MD and perform shallow hole test. Tag float, drill out cement and 20’ of new formation. Displace mud from spud mud to LSND mud. Slip and cut drill line. Perform formation integrity test to 13.0 ppg EMW. Begin to drill intermediate section from 2901’ MD to 3617’ MD. Gas: The max gas was 59 units at 3170’ MD and the average gas was 30 units. Geology: Samples consisted of mainly clean Sandstone from 2900’ MD to 3300’ MD and dirty sandstone from 3300’ MD to 3550’ MD. 01/27/2014 Continue to drill ahead from 3617’ MD to 5951’ MD. Gas: The max gas was 67 units at 3909’ MD and the average gas was 14 units. Geology: Samples consist of mainly sandstone with occasional siltstone. 80% coal in sample from 3900’ MD. 01/28/2014 Continue to drill ahead from 5951’ MD to 8748’ MD. Gas: The max gas was 284 units at 8568’ MD and the average gas was 15 units. Geology: Samples consist of mainly sandstone with occasional siltstone. 01/29/2014 Continue to drill ahead from 8748’ MD to 10690’ MD. Gas: The max gas was 320 units at 9230’ MD and the average gas was 23 units. Geology: Samples consist of mainly sandstone with occasional siltstone. 01/30/2014 Continue to drill ahead from 10690’ MD to 11975’ MD. Gas: The max gas was 519 units at 10902’ MD and the average gas was 89 units. Geology: Samples consist of mainly sandstone up to 11250’ MD and became siltier from 11250’ MD to 11975’ MD. 01/31/2014 Continue to drill ahead from 11975’ MD to intermediate TD of 12006’ MD. Begin to back ream out of hole per K&M representative. Gas: The max gas was 33 units at 11982’ MD and the average gas was 29 units. Geology: Samples consist of predominantly silt and clay with some sandstone. 02/01/2014 Continue to back ream out of the hole. Lay down BHA #4. Rig up casing equipment and begin to float 9 5/8” casing. Gas: The max gas was 54 units while back reaming out of the hole. 02/02/2014 Continue to float 9 5/8” casing to 11991’ MD. Gas: No gas data. 02/03/2014 Fill casing and cement 9 5/8” casing. Nipple down BOP and prepare to cut 9 5/8” casing. Gas: No gas data. 02/04/2014 Pick up 4.5” drill pipe. Rig up and test BOP. Gas: No gas data. 02/05/2014 Continue testing BOP. Slip and cut drill line. Pick up BHA#5, run in hole and shallow test MWD tools. Continue to run in hole. Gas: No gas data. 02/06/2014 Continue to run in hole. Circulate bottoms up and perform cement bond log to 11906’ MD. Circulate bottoms up and test 9 5/8” casing. Displace LSND mud to FazePro mud. Drill out cement and 20’ of new formation. Perform formation integrity test to 13.0 ppg EMW. Drill ahead through production section to 12045’ MD as of midnight. Gas: The max gas was 20 units at 12030’ MD and the average gas was 7 units. Geology: No samples caught before time of report. 02/07/2014 Continue to drill ahead from 12045’ MD to 14843’ MD. Gas: The max gas was 1533 units at 14195’ MD and the average gas was 377 units Geology: Samples consist of mainly sandstone. 02/08/2014 Continue to drill ahead from 14843’ MD to 17182’ MD. Gas: The max gas was 2232 units at 15403’ MD and the average gas was 577 units Geology: Samples consist of 100% sandstone. 02/09/2014 Continue to drill ahead from 17182’ MD to 19201’ MD. Gas: The max gas was 641 units at 17737’ MD and the average gas was 242 units Geology: Samples consist of 100% sandstone and 50%-70% siltstone from 18800’ MD to 19050’ MD. 02/10/2014 Continue to drill ahead from 19201' MD to 20952' MD. Gas: The max gas was 469 units at 20141’ MD and the average gas was 229 units Geology: Samples consist of 90% sandstone and 10% siltstone. 02/11/2014 TD injection hole at 21358’ MD. Backream out of hole to 16538’ MD. Gas: The max gas was 582 units at 21051’ MD and the average gas was 173 units. Geology: Samples consist of 90% sandstone and 10% siltstone. 02/12/2014 Continue to backream out of hole to 9900’ MD. Change out saver sub and all handling equipment to 4.5”. Continue to backream. Gas: No significant gas data. 02/13/2014 Make up hole opener BHA and proceed to run in hole to 5261’ MD. Gas: No significant gas data. 02/14/2014 Run in hole to 21276’ MD filling pipe every 20 stands. Wash and ream last stand down from 21276’ MD to 21358’ MD. Circulate and condition mud for displacement. Perform exhale test. Test all lines and begin displacement. Gas: No gas data. 02/15/2014 Pull out of hole to 5680’ MD. Gas: There was 62 units trip gas. 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 19000 20000 21000 22000 0 5 10 15 20 25 30 35 Me a s u r e d D e p t h Rig Days Prognosed Actual WELL NAME: SI11-FN6 OPERATOR: Eni Petroleum MUD CO: MI Swaco RIG: Doyon 15 SPERRY JOB: AK-XX-0900966765 Days vs. Depth 18 January 2014 Sperry SDL Continued on Location LOCATION: Nikaitchuq AREA: North Slope STATE: Alaska SPUD: 20-Jan-2014 TD: 11-Feb-2014 Commenced 16.0" Surface Hole Section On Bot: 13:10 20 Jan 2014 TD Surface Hole Section 2881' MD, 2464' TVD Off Bot: 15:30 22 Jan 2014 Landed 13.375" Casing 2871' MD, 2459' TVD 23 Jan 2014 Commenced 12.25" Intermediate Hole Section On Bot: 17:35 26 Jan 2014 TD Intermediate Hole Section 12006' MD, 3958' TVD Off Bot: 00:20 31 Jan 2014 Landed 9.625" Casing 11991' MD, 3956' TVD 03 Feb 2014 Commenced 8.75" Production Hole Section On Bot: 23:30 06 Feb 2014 TD Production Hole Section 21358' MD, 3923' TVD Off Bot: 08:15 11 Feb 2014 WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Surface EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Leigh Ann Rasher 20-Mar-2014 What went as, or better than, planned: No major issues with Insite or our gas equipment occurred during surface section. A new 9000 THA was sent to location and operated normally. Difficulties experienced: The hydrogen generator lost pressure a few times during the very beginning of this section. After changing out the poly flow line and connector from the hyrdogen generator to the THC for a second time the issue was solved. The pressure losses did not result in any gas data being lost on the log. Canrig Rigwatch program did not function as it should for the entire rig. Rigwatch had nearly a 2 minute delay in transmitting data. This caused problems with our depth tracking and ROP values. The company man, toolpusher, and geologist were all aware of the Rigwatch program issues rigwide. Recommendations: All mudloggers should be trained and communicated to how the connector on the back of the hydrogen generator should be place on. It needs to be tightened a tad bit but not enough to pinch the poly flow cord. Innovations and/or cost savings: N/A AK-XX-0900966765 Alaska SI11-FN6 Nikaitchuq Eni Petroleum Spy Island Surface Data Logging After Action Review WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Intermediate EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 AK-XX-0900966765 Alaska SI11-FN6 Nikaitchuq Eni Petroleum Spy Island Leigh Ann Rasher 1-Feb-2014 What went as, or better than, planned: INSITE functioned properly this section and no problems with software were experienced. The new 9000 THA worked fine as well as the gas chromatograph. Difficulties experienced: Canrigs Rigwatch system began to malfunction rigwide once again around the middle part of intermediate section. The stroke counter for pump 2 was glitchy causing our pumps stks/min to read lower than what they actually were. Canrig also caused small gaps in data due to the depth tracker being glitchy. Towards the end of the section we encountered issues with our gas detection. The latches that connect the bottom gas can part to the gas trap motor broke off. This caused the gas trap motor section to sit in the gas can at a slight angle making the blades scrape against the can. Due to the blades frequently breaking we took the gas trap set up to be welded together as a last resort. The genie filter was also changed out after unsuccessful bag test close to the end of intermediate section, we had a successful bag test of 985 units before drilling intermediate section. Recommendations: A spare gas can should have been on location for a easier fix instead of having to take the whole gas trap to the welding shop while drilling. The genie filter needs to be changed before each well. Frequent blowbacks of gas line will be key to keep moisture out of genie filter. Innovations and/or cost savings: N/A Surface Data Logging After Action Review WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 A.Paul Kalenuik 20-Mar-2014 What went as, or better than, planned: Gas traps functioned well. Insite functioned well. Lag was calculated properly. Gas lines did not freeze. Difficulties experienced: There were no mechanical or computer issues to deal with during this section. All equipment functioned as it should so diffuculties logging this section did not happen. Although attention should be given to quality control. Nessasary tasks should not be left to the next person coming on tour. By paying attention to details as they occur the quality of the overall job will rise. Recommendations: Blow back gas lines whenever the possibility arises. Innovations and/or cost savings: N/A AK-XX-0900966765 Alaska SI11-FN6 Nikaitchuq Eni Petroleum Spy Island Surface Data Logging After Action Review WELL NAME:SI11-FN6 LOCATION:Nikaitchuq OPERATOR:Eni Petroleum AREA:North Slope MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:20-Jan-2014 SPERRY JOB:AK-XX-0900966765 TD:11-Feb-2014 Marker MD INC AZ TVD TVDSS 16" Suface Borehole 20" Conductor Shoe 160.0 0.3 290.8 160.0 -106.1 SV-4 770.0 9.9 323.8 768.5 -714.6 SV-3 1142.5 22.5 328.5 1123.8 -1069.8 SV-2 1441.5 31.4 329.0 1389.6 -1335.7 Permafrost Base 1870.0 31.4 326.0 1757.5 -1703.6 SV-1 2085.0 36.3 325.5 1936.5 -1882.5 Ugnu Top (UG4)2526.5 49.6 327.1 2258.7 -2204.8 13 3/8" Casing Shoe 2871.0 58.3 325.7 2459.5 -2405.6 TD 16" Borehole 2881.0 58.5 325.7 2464.7 -2410.8 12 1/4" Intermediate Borehole UG-2 Coal Bed Marker 3915.0 82.6 325.6 2780.9 -2727.0 Lower Ugnu 8580.0 81.0 325.5 3488.7 -3434.7 Schrader Bluff 10348.0 82.7 323.5 3757.6 -3703.6 N Sequence Top 10406.0 82.2 321.6 3765.9 -3712.0 N Sand Top 10810.0 80.4 321.7 3829.1 -3775.2 N2 10918.0 80.4 322.8 3847.1 -3793.1 N3 10948.0 80.4 323.3 3852.1 -3798.1 N Sand Bottom 10973.0 80.8 323.3 3856.2 -3802.2 N Sequence Base 11493.0 85.5 322.2 3918.0 -3864.1 9 5/8" Int. Casing 11991.0 85.9 323.4 3956.2 -3902.3 TD 12 1/4" Borehole 12006.0 86.1 324.0 3957.2 -3903.3 8 3/4" Lateral Leg OA-1 12100.0 87.8 325.5 3961.9 -3907.9 OA-2 13820.0 88.0 319.1 3963.6 -3909.6 Fault A 13938.0 88.6 319.1 3967.2 -3913.3 OA-2 14250.0 88.6 320.8 3971.2 -3917.2 OA-3 14350.0 88.8 321.4 3973.5 -3919.6 OA-3 15477.0 91.7 312.3 3963.2 -3909.3 OA-2 15669.0 91.9 314.0 3957.1 -3903.2 OA-2 17035.0 88.1 310.4 3948.8 -3894.9 OA-3 17250.0 87.9 312.1 3956.1 -3902.2 OA-3 18746.0 91.3 308.2 3938.7 -3884.7 OA-2 19078.0 92.6 316.7 3926.6 -3872.6 TD 8 3/4"21358.0 87.6 309.9 3920.0 -3866.1 Formation Tops Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Leigh Ann Rasher N-Sand Andrew Buchanan 30-Jan-14 Interpretation: Non-producible hydrocarbons within this zone based off gas and chromatograph data collected. Show Report Report # 1 SI11-FN6 10800 11400 Spy Island 3827 3910 ENI Petroleum 55284 2149 53135 154 1 Hydrocarbon Ratios 10800 Gas Units 408 Mud Chlorides (mg/L) =1500 359 15 344 656 81 0 81 590 35 0 35 2 90 0 90 1518 50930 2149 48781 144 353 15 338 642 10902 Gas Units 520 Mud Chlorides (mg/L) =1500 50 0 50 3 Hydrocarbon Ratios 76 0 76 1318 37 0 37 976 30560 2350 28210 131 229 14 215 261 11315 Gas Units 302 Mud Chlorides (mg/L) =1550 140 22 118 95 339 42 297 113 5 108 239 16400 2350 14050 136 4 11395 Gas Units 171 Mud Chlorides (mg/L) =1550 83 22 61 148 137 42 95 117 14 103 234 65 5 60 230 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 287 244 43 572 320 154 166 534 133 401 430 356 135 221 2210 105653 10634 95019 237 4 13712 Gas Units 824 Mud Chlorides (mg/L) =80000 253 208 45 513 325 98 227 392 112 280 2586 127480 11099 116381 238 604 116 488 416 13350 Gas Units 994 Mud Chlorides (mg/L) =80000 208 26 182 3 Hydrocarbon Ratios 276 54 222 1216 169 94 75 501 98606 7425 91181 221 487 75 412 411 12699 Gas Units 766 Mud Chlorides (mg/L) =77000 119 0 119 2 322 24 298 804 498 33 465 407 254 19 235 321 102195 6553 95642 206 1 Hydrocarbon Ratios 12374 Gas Units 779 Mud Chlorides (mg/L) =77000 Leigh Ann Rasher OA-Sand Andrew Buchanan 7-Feb-14 Interpretation: Non-producible hydrocarbons within this zone based off gas and chromatograph data collected. Show Report Report # 2 SI11-FN6 12300 13800 Spy Island 3965 3963 ENI Petroleum 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 205 86 119 819 260 36 224 561 38 523 628 329 37 292 1542 188141 4695 183446 351 4 15725 Gas Units 1488 Mud Chlorides (mg/L) =65000 198 123 75 1670 261 98 163 330 48 282 3629 280240 8039 272201 517 578 51 527 965 15403 Gas Units 2232 Mud Chlorides (mg/L) =67000 273 127 146 3 Hydrocarbon Ratios 317 60 257 4241 210 172 38 1104 167016 5851 161165 328 541 49 492 627 14790 Gas Units 1328 Mud Chlorides (mg/L) =72000 259 54 205 2 546 120 426 637 525 92 433 565 339 108 231 307 137430 6833 130597 302 1 Hydrocarbon Ratios 14101 Gas Units 1221 Mud Chlorides (mg/L) =75000 Kori Jo Plowman OA Sands Andrew Buchanan 2/16/2014 Interpretation: Non-producible hydrocarbons within this zone based off gas and chromatograph data collected. Show Report Report # 3 SI11-FN6 14000 15800 Spy Island 3967 3954 ENI Petroleum 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Paul kalenuik OA Sands Andrew Buchanan 2/16/2014 Interpretation: Non-producible hydrocarbons within this zone based off gas and chromatograph data collected. Show Report Report # 4 SI11-FN6 17900 19600 Spy Island 3955 3919 ENI 33839 8782 25057 202 1 Hydrocarbon Ratios 17980 Gas Units 584 Mud Chlorides (mg/L) =64000 193 69 124 343 136 63 73 583 144 55 89 2 109 66 43 282 58570 7594 50976 221 288 57 231 364 18581 Gas Units 592 Mud Chlorides (mg/L) =64000 192 81 111 3 Hydrocarbon Ratios 196 56 140 560 149 58 91 459 30060 8478 21582 242 169 80 89 366 18753 Gas Units 413 Mud Chlorides (mg/L) =69000 117 81 36 540 154 114 40 139 80 59 600 43032 6495 36537 201 4 19539 Gas Units 334 Mud Chlorides (mg/L) =64000 128 47 81 373 167 69 98 231 49 182 304 168 48 120 451 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH SI11-FN6 Eni Petroleum MI Swaco Doyon 15 AK-XX-0900966765 Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++ 20-Jan 302 8.90 101 32 29 19/38/47 3.2 93/61/49/38/18/16 3/-4.0 1/95 0.10 0.15 94.0 19.0 .10/.40 2300 80 P/U BHA #3 21-Jan 1438 9.10 104 31 34 26/53/68 5.4 96/65/54/41/23/21 2/-6.0 1/93 0.25 0.20 10.2 24.0 .10/.35 2200 88 Drill 16" Surface 22-Jan 2881 9.40 97 33 36 25/54/65 4.8 102/69/57/41/19/17 2/-7.0 1/92 0.15 0.15 9.5 22.0 .08/.25 1700 60 BROOH 23-Jan 2881 9.40 101 34 32 23/55/66 5.1 100/66/54/40/20/19 2/-7.0 1/92 0.20 0.10 9.1 22.5 .10/.30 1700 60 Condition Mud & Circulate 24-Jan 2881 9.30 40 12 11 4/5/6 -35/23/18/13/5/4 -----6.7 ----Body Test 25-Jan 2881 9.30 45 12 19 10/12/13 6.5 43/31/29/23/11/10 1/-3.0 2/95 0.00 0.20 9.8 0.0 .10/1.10 800 40 P/U 5" DP 26-Jan 3250 9.30 47 10 24 10/13/14 6.5 44/34/30/24/11/9 1/-4.0 2/94 0.25 0.25 9.9 1.0 .15/1.00 800 75 Drill 12.25" Intermediate 27-Jan 5669 9.30 55 12 31 16/25/28 5.0 55/43/38/30/15/13 1/-6.0 3/91 0.10 0.25 9.9 15.0 .15/1.00 1100 52 Drill 12.25" Intermediate 28-Jan 8426 9.35 49 12 26 17/37/46 5.2 50/38/33/27/15/13 1/-5.3 3/91.75 0.10 0.18 9.4 17.5 .08/.88 1500 60 Drill 12.25" Intermediate 29-Jan 10341 9.25 46 11 23 11/26/32 5.0 45/34/30/23/12/10 1/-5.0 3/92 0.10 0.20 9.4 15.5 .10/.95 1600 50 Drill 12.25" Intermediate 30-Jan 11837 9.40 52 13 26 14/47/58 5.0 52/39/33/27/13/11 1/-5.8 3/91.25 0.10 0.32 9.7 18.0 .10/.90 1700 52 Drill 12.25" Intermediate 31-Jan 12006 9.35 47 11 23 12/38/53 5.0 45/34/29/23/12/10 1/-5.8 3/91.25 0.05 0.20 9.7 17.0 .10/.90 1400 48 BROOH 1-Feb 12006 9.35 48 12 27 17/43/58 5.2 51/39/34/26/13/11 1/-5.5 2.75/91.75 0.05 0.25 9.8 18.5 .15/.90 1400 50 Float 9 5/8" Casing 2-Feb 12006 9.40 54 13 25 14/45/58 5.1 51/38/32/24/14/12 1/-5.8 2.75/91.5 0.10 0.25 9.7 18.5 .15/.90 1500 54 R/D Tesco Equip 3-Feb 12006 9.30 41 12 15 6/9/14 -39/27/24/16/6/5 ----------Prep Cut 9 5/8" Csg 4-Feb 12006 9.30 43 12 15 6/9/14 -39/27/24/16/6/5 ----------Test BOPs 5-Feb 12006 9.30 48 10 16 6/12/21 -36/26/21/16/7/6 -----8.8 ----RIH BHA #5 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Alka POM Excess Lime Emul Stab CaCl2 WPS LGS/HGS ASG Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG 6-Feb 12026 9.3 47 14 16 3/7/7 -44/30/24/18/8/7 -5.42 67/33 2.75 3.58 495 81000 .63/52.41 2.8 Drill 8.75" Injection 7-Feb 14472 9.2 46 14 16 7/8/8 4.5 44/30/25/19/8/7 NA/2 7.09 67/33 3 3.9 665 72000 4.03/65.12 2.8 Drill 8.75" Injection 8-Feb 16889 9.25 45 13 17 7/8/8 4.4 43/30/25/18/8/7 NA/2 7.94 69/31 2.3 2.99 610 64000 3.78/73/68 2.8 Drill 8.75" Injection 9-Feb 18951 9.3 47 14 19 8/8/8 4.2 47/33/27/20/8/7 NA/1.5 8.11 69/31 2.85 3.71 615 69000 2.44/76.8 2.8 Drill 8.75" Injection 10-Feb 20810 9.25 47 14 19 7/8/8 4.6 47/33/28/20/8/7 NA/1.5 7.83 68/32 2.65 3.45 640 72000 1.2/65.36 2.8 Drill 8.75" Injection 11-Feb 21358 9.3 49 14 18 8/8/8 4.7 46/32/26/19/8/7 NA/2 8.1 97/33 2.5 3.25 637 71500 1.5/65 2.8 12-Feb 21358 9.25 48 15 16 7/8/8 4.9 46/31/25/18/8/7 NA/2 7.12 67/33 2.5 3.25 619 71500 0.7/63.4 2.8 13-Feb 21358 9.2 48 15 17 8/8/8 4.8 47/32/26/19/8/7 NA/2 7.12 67/33 2.5 3.25 616 71500 1/60.46 2.8 RIH HOLE OPENER 14-Feb 21358 9.2 50 16 16 8/8/9 NA 48/32/26/20/8/8 NA/-7.12 67/33 2.5 3.25 603 71500 1/60.46 2.8 POOH 15-Feb 21358 9.25 ---------------DISPlACING Casing Record WELL NAME:LOCATION:Nikaitchuq OPERATOR:AREA:North Slope MUD CO:STATE:Alaska RIG:SPUD:20-Jan-2014 SPERRY JOB:TD:11-Feb-2014 Remarks 20" Conductor @ 160' MD, 160'TVD 13.375" Casing @ 2871' MD, 2459'TVD 9.625" Casing @ 11991' MD, 3956'TVD W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 2 100 1 Hughes MX-1 Milltooth 16.00 160 303 143 1.40 1.117 101.4 30 40 550 550 N/A POOH gyro tool failure 3 100 1RR Hughes MX-1 Milltooth 16.00 303 2881 2878 19.40 1.117 132.6 30 50 1700 700 1-1-WT-A-E-I-NO-TD Surface TD 4 200 2 Hal MM75D PDC 12.25 2881 12006 9125 72.50 0.969 125.9 15 180 2850 900 2-4-BT-G-X-In-CT-TD Intermediate TD 5 300 3 Smith MDSi616EBPX PDC 8.75 12006 21358 9352 55.30 0.902 169.0 10 160 3700 540 0-0-CT-M-X-I-NO-TD Injection TD Alaska RIG:Doyon 15 SPUD:20-Jan-2014 WELL NAME:SI11-FN6 LOCATION:Nikaitchuq OPERATOR:Eni Petroleum AREA:North Slope MUD CO: SPERRY JOB:AK-XX-0900966765 TD:11-Feb-2014 MI Swaco STATE: B i t R e c o r d . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-0772Unit Phone: 0 A.Paul Kalenuik Maximum Report By:Logging Engineers:A.Paul Kalenuik/Kori Jo Plowman 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth C-5nC-2 in Minimum Depth Time: PT suitcase lines, bring mud into pits. Dummy run 13 3/8" hanger.Install diverter pup, cont. BOP N/U. 0' 0' 0' Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) M. Ross/ R. Wimmer ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0900966765 Rig Up PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 ConditionBit #Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 1 Customer: Well: Area: Location: Rig: SI11-FN5 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 19-Jan-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l N/U BOP and test as per Vetco Grey.Weld spacer pup for diverter, load casing into pipe shed, Density (ppg) out (sec/qt) Viscosity Cor Solids % . . Cly Set AtSize 178.9 X-65 Grade 20.00''Casing Summary Lithology (%) MBT 303' pH 1.117 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 19.0101 in Time: 160' 303' 143' Max @ ft Current 161'134.3 Date: Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: 332.0 Flow In (gpm) Flow In (spm) (current) M. Ross/ R. Wimmer ShClyst TuffGvlCoal cP 32 143' Footage 1.40 Ss (ppb Eq) AK-AM-0900966765 $3,810.00 $8,520.00 P/U BHA #3 PV 24 hr Max Weight Hours CementCht Silt YP (lb/100ft2) 9.40 40.0 Spud Mud 3.2302'29 Depth in / out Mud Type Lst Type 10.2411.24 Avg Min Comments RPM ECD (ppg) ml/30min Tools SP Motor 1.83, GyroPulse, TeleScope 825, ARC 825 API FL 3.0160' 303' WOB EVEMAR160' ConditionBit # 1 4.0 16Hughes MX-1 Mill Tooth 8.90 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 13.00 DOYON 15 Report For: Morning Report Report # 2 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.96 @ Mud Data Depth 20-Jan-2014 12:00 AM Current Pump & Flow Data: Max Chlorides mg/l 2300.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 55 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman 34 27 Units* 0 0 0 0 C-5n 273' C-2 8 4 297'Minimum Depth No samples collected in surface section. 6 Gas Summary 0 0 0 () C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 32Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 P/U C/O BHA. L/D C/O BHA & P/U BHA #2. Drill ahead through surface section to 303' MD. POOH due to gyro issues. . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 2200.00 21-Jan-2014 12:00 AM Current Pump & Flow Data: 1170 Max ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 3 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.62 DOYON 15 Report For: ConditionBit # 1 6.0 16Hughes MX-1 Mill Tooth 9.10 Size 160' Tools SP Motor 1.83, GyroPulse, TeleScope 825, ARC 825 API FL 3.0160' 303' WOB EVEMAR 8.219.41 Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Type 40.0 Spud Mud 5.41438'34 Depth in / out YP (lb/100ft2) 10.20 CementCht Silt 24 hr Max Weight Hours Ss (ppb Eq) AK-AM-0900966765 $2,810.00 $11,330.00 Drill 16" Section PV 143' Footage 1.40 M. Ross/ O. Amend ShClyst TuffGvlCoal cP 31 (current) Avg to303' Yesterday's Depth: Current Depth: 24 Hour Progress: 375.9 Flow In (gpm) Flow In (spm) 303' 1625' 1322' Max @ ft Current 1441'194.2 Date: Time: in 53.8 SPP (psi) Gallons/stroke TFABit Type Depth 24.0104 MBT 1625' pH 1.117 Siltst 657 143 Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20.00'' Cly * 24 hr Recap:P/U BHA #3. RIH & cont drill ahead f/ 303' MD to 1625' MD. Experiencing Rigwatch glitches rig wide. No samples 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) 2Background (max)Trip Average - 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 () collected in surface section. 16 4 796'Minimum Depth C-5n 1604' C-2 88 0 0 0 Units* 01338 343 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman (max)(current) 0 0 10066 . . Cly Set AtSize 178.9 X-65 Grade 20.00'' 784 158 Casing Summary Lithology (%) MBT 2881' pH 1.117 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 22.097 in Time: 1625' 2881' 1256' Max @ ft Current 2691'249.1 Date: Avg to1625' Yesterday's Depth: Current Depth: 24 Hour Progress: 305.0 Flow In (gpm) Flow In (spm) (current) M. Ross/ O. Amend ShClyst TuffGvlCoal cP 33 143' Footage 1.40 Ss (ppb Eq) AK-AM-0900966765 $2,810.00 $14,140.00 BROOH PV 24 hr Max Weight Hours CementCht Silt YP (lb/100ft2) 9.50 40.0 Spud Mud 4.82881'36 Depth in / out Mud Type Lst Type 9.9110.24 Avg Min Comments RPM ECD (ppg) ml/30min Tools SP Motor 1.83, GyroPulse, TeleScope 825, ARC 825 API FL 3.0160' 303' WOB EVEMAR160' ConditionBit # 1 7.0 16Hughes MX-1 Mill Tooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.40 DOYON 15 Report For: Morning Report Report # 4 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.96 @ Mud Data Depth 22-Jan-2014 12:00 AM Current Pump & Flow Data: 1188 Max Chlorides mg/l 1700.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 20 0 55761 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman 14186 1760 Units* 0 0 0 0 C-5n 1625' C-2 448 19 2845'Minimum Depth surface section. 109 Gas Summary 0 0 0 () C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 35135Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Cont to drill ahead f/ 1625' MD to suface TD of 2881' MD. Circ B/U 2x. Begin to BROOH. No samples collected in . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1700.00 23-Jan-2014 12:00 AM Current Pump & Flow Data: 145 Max ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 5 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 7.0 16Hughes MX-1 Mill Tooth 9.40 Size 2871' 160' Tools API FL 30.0303' 2881' WOB WELD Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Type 50.0 Spud Mud 5.12881'32 Depth in / out YP (lb/100ft2) 9.10 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900966765 $2,810.00 $16,950.00 Circ & cond mud PV 2578' Footage 19.40 M. Ross/ O. Amend ShClyst TuffGvlCoal cP 34 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2881' 2881' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 22.5101 L-80 MBT pH 1.117 Siltst 13 3/8" 209 42 Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20.00'' BTC Cly * 24 hr Recap:Cont BROOH per K&M rep. L/D BHA #3. R/U csg equip. RIH w/ 13 3/8" csg to 2871' MD. Circ & cond mud. Prep to 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) Background (max)Trip Average 194 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 () cmt csg. Minimum Depth C-5nC-2 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman (max)(current) 0 0 0 . . BTC Cly Set AtSize 178.9 X-65 Grade 20.00'' 13 3/8" Casing Summary Lithology (%) L-80 MBT pH 1.117 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 40 in Time: 2881' 2881' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) (current) M. Ross/ O. Amend ShClyst TuffGvlCoal cP 12 2578' Footage 19.40 Ss (ppb Eq) AK-AM-0900966765 $2,810.00 $19,760.00 Perform body test PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 6.70 50.0 Spud Mud2881'11 Depth in / out Mud Type Lst Type Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 30.0303' 2881' WOB WELD 2871' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 16Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 6 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.96 @ Mud Data Depth 24-Jan-2014 12:00 AM Current Pump & Flow Data: Max Chlorides mg/l Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman 0 0 Units* 0 0 0 0 C-5nC-2 Minimum Depth choke. Gas Summary 0 0 0 () C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 134Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Cont circ & cond mud. Cmt surface csg & R/D csg equip. N/D diverter. N/U BOP. R/U & perform body test on bag & . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 800.00 25-Jan-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 7 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 3.0 16Hughes MX-1 Mill Tooth 9.30 Size 2871' 160' Tools API FL 30.0303' 2881' WOB WELD Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Type 50.0 LSND 6.52881'19 Depth in / out YP (lb/100ft2) 9.80 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $23,170.00 P/U 5" DP PV 2578' Footage 19.40 M. Ross/ O. Amend ShClyst TuffGvlCoal cP 12 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2881' 2881' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 45 L-80 MBT pH 1.117 Siltst 13 3/8" Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20.00'' BTC Cly * 24 hr Recap:R/D test equip. Service traveling equip & drawworks. P/U 5" DP. Test BOP, failed test on choke HCR. Cont P/U 5" 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) Background (max)Trip Average 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 () DP. Minimum Depth C-5nC-2 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman (max)(current) 0 0 0 . . BTC Cly Set AtSize 178.9 X-65 Grade 20.00'' 10 13 3/8" 899 181 Casing Summary Lithology (%) L-80 MBT 3617' pH 1.117 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1.047 304.0 in Time: 2881' 3617' 736' Max @ ft Current 3172'193.4 Date: Avg to2881' Yesterday's Depth: Current Depth: 24 Hour Progress: 330.5 Flow In (gpm) Flow In (spm) (current) M. Ross/ O. Amend ShClyst TuffGvlCoal cP 10 2578' 12.25 0.969 Footage 19.40 Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $26,580.00 Drill 12.25" section PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 9.90 50.0 Hal MM75D PDC LSND 6.5 2881' 3250'24 Depth in / out Mud Type Lst 90 Type 9.369.84 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL 30.0303' 2881' WOB WELD 2 2871' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 4.0 16Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.11 DOYON 15 Report For: Morning Report Report # 8 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.96 @ Mud Data Depth 26-Jan-2014 12:00 AM Current Pump & Flow Data: 1588 Max Chlorides mg/l 800.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 7296 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman 3383 1453 Units* 0 0 0 0 C-5n 3170' C-2 59 Max Gas: 59u Avg Gas: 30u 14 3604'Minimum Depth mud. Slip & cut drill line. Perform FIT to 13.0 ppg EMW. Begin to drill intermediate section f/ 2901' MD to 3617' MD. Samples 30 Gas Summary 0 0 0 () C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 218Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 consisted of mainly clean Sst f/ 2900' MD - 3300' MD and dirty sst f/ 3300' MD to 3550' MD. 0 Cont P/U 5" DP. P/U BHA #4. RIH to 1650' MD & perform SHT. Tag float, drill out cmt & 20' of new formation. Displace . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1100.00 27-Jan-2014 12:00 AM Current Pump & Flow Data: 1980 Max ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 9 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.16 DOYON 15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 6.0 16Hughes MX-1 Mill Tooth 9.30 Size 2 2871' 160' Tools Xceed 900, TeleScope 825, ARC 825 API FL 30.0303' 2881' WOB WELD 9.969.58 Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst 90 Type 50.0 Hal MM75D PDC LSND 5.0 2881' 5669'31 Depth in / out YP (lb/100ft2) 9.90 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $29,990.00 Drill 12.25" section PV 2578' 12.25 0.969 Footage 19.40 M. Ross/ O. Amend ShClyst TuffGvlCoal cP 12 (current) Avg to3617' Yesterday's Depth: Current Depth: 24 Hour Progress: 455.3 Flow In (gpm) Flow In (spm) 3617' 5951' 2334' Max @ ft Current 5023'224.9 Date: Time: in 241.4 SPP (psi) Gallons/stroke TFABit Type Depth 15.055 L-80 MBT 5951' pH 1.117 Siltst 13 3/8" 898 181 Casing Summary Lithology (%) 10 Set AtSize 178.9 X-65 Grade 20.00'' BTC Cly * 24 hr Recap:Cont drill ahead f/ 3617' MD to 5951' MD. Samples consist of mainly sst w/ occassional sltst. 80% coal in sample f/ 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) 3Background (max)Trip Average 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 () 3900' MD. 14 Max Gas: 67u Avg Gas: 14u 2 4929'Minimum Depth C-5n 3909' C-2 67 0 0 0 Units* 01241 837 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman (max)(current) 6 0 8339 . . BTC Cly Set AtSize 178.9 X-65 Grade 20.00'' 30 13 3/8" 884 193 Casing Summary Lithology (%) L-80 MBT 8748' pH 1.117 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 17.549 241.4 in Time: 5951' 8748' 2797' Max @ ft Current 7822'285.6 Date: Avg to5951' Yesterday's Depth: Current Depth: 24 Hour Progress: 575.4 Flow In (gpm) Flow In (spm) (current) J. Keener / O. Amend ShClyst TuffGvlCoal cP 12 2578' 12.25 0.969 Footage 19.40 Ss (ppb Eq) AK-AM-0900966765 $4,410.00 $34,400.00 Drill 12.25" section PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 9.40 50.0 Hal MM75D PDC LSND 5.2 2881' 8426'26 Depth in / out Mud Type Lst 70 Type 8.6910.33 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL 30.0303' 2881' WOB WELD 2 2871' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.3 16Hughes MX-1 Mill Tooth 9.35 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.55 DOYON 15 Report For: Morning Report Report # 10 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.96 @ Mud Data Depth 28-Jan-2014 12:00 AM Current Pump & Flow Data: 2429 Max Chlorides mg/l 1500.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 15 0 38566 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman 1896 565 Units* 0 0 0 0 C-5n 8568' C-2 284 Max Gas: 284u Avg Gas: 15u 4 7809'Minimum Depth 15 Gas Summary 0 0 0 () C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 10Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Cont drill ahead f/ 5951' MD to 8748' MD. Samples consist of mainly clean sst w/ occassional sltst. . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1600.00 29-Jan-2014 12:00 AM Current Pump & Flow Data: 2322 Max ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 11 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.55 DOYON 15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.0 16Hughes MX-1 Mill Tooth 9.25 Size 2 2871' 160' Tools Xceed 900, TeleScope 825, ARC 825 API FL 30.0303' 2881' WOB WELD 7.8810.17 Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst 100 Type 50.0 Hal MM75D PDC LSND 5.0 2881' 10341'23 Depth in / out YP (lb/100ft2) 9.40 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $37,810.00 Drill 12.25" section PV 2578' 12.25 0.969 Footage 19.40 J. Keener / O. Amend ShClyst TuffGvlCoal cP 11 (current) Avg to8748' Yesterday's Depth: Current Depth: 24 Hour Progress: 466.6 Flow In (gpm) Flow In (spm) 8748' 10690' 1942' Max @ ft Current 8943'227.6 Date: Time: in 26.8 SPP (psi) Gallons/stroke TFABit Type Depth 15.546 L-80 MBT 10690' pH 1.117 Siltst 13 3/8" 850 185 Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20.00'' BTC Cly * 24 hr Recap:Cont drill ahead f/ 8748' MD to 10690' MD. Samples consist of mainly clean sst w/ occasional sltst. 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) 9Background (max)Trip Average 000 00 C-4i C-4n 7 C-3C-1 C-5i Gas Summary 0 0 0 () 23 Max Gas: 320u Avg Gas: 23u 2 10103'Minimum Depth C-5n 9230' C-2 320 0 0 0 Units* 02680 281 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller (max)(current) 15 0 44804 . . BTC Cly Set AtSize 178.9 X-65 Grade 20.00'' 20 13 3/8" 844 170 Casing Summary Lithology (%) L-80 MBT 11975' pH 1.117 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 18.052 73.5 in Time: 10690' 11975' 1285' Max @ ft Current 10997'98.5 Date: Avg to10690' Yesterday's Depth: Current Depth: 24 Hour Progress: 348.1 Flow In (gpm) Flow In (spm) (current) J. Keener / O. Amend ShClyst TuffGvlCoal cP 13 2578' 12.25 0.969 Footage 19.40 Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $41,220.00 Drill 12.25" section PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 9.70 50.0 Hal MM75D PDC LSND 5.0 2881' 11837'26 Depth in / out Mud Type Lst 60 Type 7.9810.34 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL 30.0303' 2881' WOB WELD 20 2 2871' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.8 16Hughes MX-1 Mill Tooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.43 DOYON 15 Report For: Morning Report Report # 12 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.96 @ Mud Data Depth 30-Jan-2014 12:00 AM Current Pump & Flow Data: 2671 Max Chlorides mg/l 1700.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 453 0 65914 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller 9331 357 Units* 0 0 46 0 C-5n 10902' C-2 519 Max Gas: 519u Avg Gas: 89u 4 11672'Minimum Depth siltier f/ 11250' MD to current depth. 89 Gas Summary 0 61 45 () C-1 C-5i 73 C-3 00 C-4i C-4n 000Average 29Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 90 0 Cont drill ahead f/ 10690' MD to 11975' MD. Samples consist of mainly clean sst up to 11250' MD and became . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1400.00 31-Jan-2014 12:00 AM Current Pump & Flow Data: 1858 Max ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 13 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.39 DOYON 15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.8 16Hughes MX-1 Mill Tooth 9.35 Size 2 2871' 160' 20 Tools Xceed 900, TeleScope 825, ARC 825 API FL 30.0303' 2881' WOB WELD 10.3810.39 Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst 40 Type 50.0 Hal MM75D PDC LSND 5.0 2881' 12006'23 12006' Depth in / out YP (lb/100ft2) 9.70 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $44,630.00 BROOH PV 2578' 12.25 0.969 Footage 19.40 J. Keener / O. Amend ShClyst TuffGvlCoal cP 11 (current) Avg to11975' Yesterday's Depth: Current Depth: 24 Hour Progress: 92.7 Flow In (gpm) Flow In (spm) 11975' 12006' 31' Max @ ft Current 12000'81.0 Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 17.047 L-80 MBT 12006' pH 1.117 Siltst 13 3/8" 852 185 Casing Summary Lithology (%) 40 Set AtSize 178.9 X-65 Grade 20.00'' BTC Cly * 24 hr Recap:Drill ahead f/ 11975' MD to intermediate TD of 12006' MD. Begin BROOH per K&M rep. Last sample consisted of 0 100% Gas In Air=10,000 UnitsConnection 5 Chromatograph (ppm) 29Background (max)Trip Average 77 000 010 C-4i C-4n 12 C-3C-1 C-5i Gas Summary 8 10 0 () mainly silt/clay w/ some sst. 29 Max Gas: 33u Avg Gas: 29u 22 12002'Minimum Depth C-5n 11982' C-2 33 0 0 0 Units* 02204 1341 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller (max)(current) 13 7 2560 . . BTC Cly Set AtSize 178.9 X-65 Grade 20.00'' 13 3/8" Casing Summary Lithology (%) L-80 MBT pH 1.117 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 18.548 in Time: 12006' 12006' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) (current) J. Keener / O. Amend ShClyst TuffGvlCoal cP 12 2578' 12.25 0.969 Footage 72.50 9125' 19.40 Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $48,040.00 Float 9 5/8" Csg PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 9.80 180 50.0 Hal MM75D PDC LSND 5.2 2881' 12006'27 12006' Depth in / out Mud Type Lst Type Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 15 30.0303' 2881' WOB WELD 2 2871' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.5 16Hughes MX-1 Mill Tooth 9.35 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 14 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE 2-4-BT-G-X-In-CT-TD ROP ROP (ft/hr) 4.96 @ Mud Data Depth 1-Feb-2014 12:00 AM Current Pump & Flow Data: Max Chlorides mg/l 1400.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller 0 0 Units* 0 0 0 0 C-5nC-2 Max Gas: N/A Avg Gas: N/A Minimum Depth Gas Summary 0 0 0 () C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 54Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Cont BROOH. L/D BHA #4. R/U csg equip. Float 9 5/8" csg. . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1500.00 2-Feb-2014 12:00 AM Current Pump & Flow Data: Max 2-4-BT-G-X-In-CT-TD ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 15 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.8 16Hughes MX-1 Mill Tooth 9.40 Size 2 2871' 160' Tools API FL 15 30.0303' 2881' WOB WELD Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Hydril 563 Type 180 50.0 Hal MM75D PDC LSND 5.1 2881' 12006'25 12006' Depth in / out YP (lb/100ft2) 9.70 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $51,450.00 R/D Csg Equip PV 2578' 12.25 0.969 Footage 72.50 9125' 19.40 J. Keener / O. Amend ShClyst TuffGvlCoal cP 13 40.0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 12006' 12006' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 18.554 L-80 MBT pH 1.117 Siltst 13 3/8" Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade L-8011991' 20.00'' 9 5/8" BTC Cly * 24 hr Recap:Cont float 9 5/8" csg to 11991' MD. 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) Background (max)Trip Average 16 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 () Max Gas: N/A Avg Gas: N/A Minimum Depth C-5nC-2 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller (max)(current) 0 0 0 . . BTC Cly Set AtSize 178.9 X-65 Grade L-8011991' 20.00'' 9 5/8" 13 3/8" Casing Summary Lithology (%) L-80 MBT pH 1.117 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 41 in Time: 12006' 12006' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 (current) J. Keener / O. Amend ShClyst TuffGvlCoal cP 12 2578' 12.25 0.969 Footage 72.50 9125' 19.40 Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $54,860.00 Prep cut 9 5/8" csg PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 180 50.0 Hal MM75D PDC LSND 2881' 12006'15 12006' Depth in / out Mud Type Lst Hydril 563 Type Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 15 30.0303' 2881' WOB WELD 2 2871' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 16Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 16 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE 2-4-BT-G-X-In-CT-TD ROP ROP (ft/hr) 4.96 @ Mud Data Depth 3-Feb-2014 12:00 AM Current Pump & Flow Data: Max Chlorides mg/l Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller 0 0 Units* 0 0 0 0 C-5nC-2 Max Gas: N/A Avg Gas: N/A Minimum Depth Gas Summary 0 0 0 () C-1 C-5i 0 C-3 00 C-4i C-4n 000Average Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Fill csg & Cmt 9 5/8" csg. N/D BOP. Prep cut csg. Fi` . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 4-Feb-2014 12:00 AM Current Pump & Flow Data: Max 2-4-BT-G-X-In-CT-TD ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 17 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 16Hughes MX-1 Mill Tooth 9.30 Size 2 2871' 160' Tools API FL 15 30.0303' 2881' WOB WELD Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Hydril 563 Type 180 50.0 Hal MM75D PDC LSND 2881' 12006'15 12006' Depth in / out YP (lb/100ft2) CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $58,270.00 Test BOPs PV 2578' 12.25 0.969 Footage 72.50 9125' 19.40 J. Keener / R. Wimmer ShClyst TuffGvlCoal cP 12 40.0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 12006' 12006' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 43 L-80 MBT pH 1.117 Siltst 13 3/8" Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade L-8011991' 20.00'' 9 5/8" BTC Cly * 24 hr Recap:P/U DP 4.5". R/U & test BOP. Fi` 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) Background (max)Trip Average 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 () Max Gas: N/A Avg Gas: N/A Minimum Depth C-5nC-2 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller (max)(current) 0 0 0 . . BTC Cly Set AtSize 178.9 X-65 Grade L-8011991' 20.00'' 9 5/8" 13 3/8" Casing Summary Lithology (%) L-80 MBT pH 0.969 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 48 in Time: 12006' 12006' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 (current) J. Keener / R. Wimmer ShClyst TuffGvlCoal cP 10 9125' 8.75 0.902 Footage 72.50 Ss (ppb Eq) AK-AM-0900966765 $3,410.00 $61,680.00 RIH w/ BHA #5 PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 8.80 180 Smith MDsi616EBPX PDC LSND 12006' 12006'16 Depth in / out Mud Type Lst Hydril 563 Type Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed675, EcoScope 675, TeleScope 675, SonicVision API FL 152881' 12006' WOB WELD 3 2871' 160' Condition 2-4-BT-G-X-In-CT-TD Bit # 2 12.25Hal MM75D PDC 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 18 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.96 @ Mud Data Depth 5-Feb-2014 12:00 AM Current Pump & Flow Data: Max Chlorides mg/l Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller 0 0 Units* 0 0 0 0 C-5nC-2 Max Gas: N/A Avg Gas: N/A Minimum Depth Gas Summary 0 0 0 () C-1 C-5i 0 C-3 00 C-4i C-4n 000Average Background (max)Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Cont test BOP. Slip & cut drill line. P/U BHA #5. RIH & SHT. Cont RIH. Fi` . . Lime (lb/bbl) Density (ppg) out (sec/qt) Viscosity Cor Solids % 3.58 6-Feb-2014 12:00 AM Current Pump & Flow Data: 3172 Max ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 19 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Condition 2-4-BT-G-X-In-CT-TD Bit # 2 5.4 12.25Hal MM75D PDC 9.30 Size 3 2871' 160' Tools Xceed675, EcoScope 675, TeleScope 675, SonicVision API FL 152881' 12006' WOB WELD Avg Min Comments Mud RPM ECD (ppg) ml/30minMud Type Lst Hydril 563 Type 180 Smith MDsi616EBPX PDC FazePro NA 12006' 12026'16 Depth in / out YP (lb/100ft2) 2.75 CementCht Silt 24 hr Max 68.0 Weight Hours Ss Ratio AK-AM-0900966765 $3,410.00 $65,090.00 Drill 8.75" Section PV 9125' 8.75 0.902 Footage 72.50 J. Keener / R. Wimmer ShClyst TuffGvlCoal cP 14 40.0 (current) Avg to12006' Yesterday's Depth: Current Depth: 24 Hour Progress: 220.3 Flow In (gpm) Flow In (spm) 12006' 12045' 39' Max @ ft Current 12008'130.0 Date: Time: in 121.8 SPP (psi) Gallons/stroke TFABit Type Depth 67/3347 L-80 Oil / Water 12045' Alkal 0.969 Siltst 13 3/8" 654 132 Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade L-8011991' 20.00'' 9 5/8" BTC Cly * 24 hr Recap:Cont RIH. CBU & Cmt Bond Log to 11906' MD. CBU, Test csg. Displace LSND to FazePro mud. Drill out cmt Fi` 0 time of report. 100% Gas In Air=10,000 UnitsConnection 6 Chromatograph (ppm) 2Background (max)Trip Average 21 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 () & 20' new hole. Perform FIT to 13.00 ppg. Drill ahead through production section to 12045' MD. No samples collected before 7 Max Gas: 20 units Avg Gas: 7 units 2 12006'Minimum Depth C-5n 12030' C-2 20 0 0 0 Units* 0671 130 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Jade Miller (max)(current) 11 0 1898 . . Lime (lb/bbl) Cly Set AtSize 178.9 X-65 Grade L-8011991' 20.00'' 13 3/8" 546 129 Casing Summary Lithology (%) 9 5/8" BTC L-80 Oil / Water 14843' Alkal 0.969 Siltst TFABit Type Depth 67/3346 351.2 in 12045' 14843' 2798' Max @ ft Current 14110'293.5 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 536.9 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke (current) J. Keener / R. Wimmer ShClyst TuffGvlCoal cP 14 8.75 0.902 Footage 72.50 Ss Ratio AK-AM-0900966765 $4,410.00 $69,500.00 Drill 8.75" Section PV 9125' Hours 40.0 CementCht Silt 180 Smith MDsi616EBPX PDC FazePro NA 12006' 14472'16 Depth in / out 3.00 Mud Type Lst 100 Hydril 563 Type (lb/100ft2) 68.0 Weight Mud RPM ECD (ppg) ml/30min 152881' 12006' WOB WELD Comments 3 2871' 160' Condition 2-4-BT-G-X-In-CT-TD Bit # 2 7.1 12.25Hal MM75D PDC 9.20 Size 96% Rig Activity: 11.32 DOYON 15 Report For: Tools Xceed675, EcoScope 675, TeleScope 675, SonicVision 10.3311.03 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to12045' Depth Morning Report Report # 20 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP 7-Feb-2014 12:00 AM Current Pump & Flow Data: 3237 Max 3.90 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: 492 0 196235 Leigh Ann Rasher/Kori Jo Plowman 907-685-0772Unit Phone: 96 Leigh Ann Rasher Maximum Report By:Logging Engineers: 034516 195 Units* 0 218 0 14195' C-2 1533 Max Gas: 1533 units Avg Gas: 377 units 4 12244'Minimum Depth C-5n 377 Gas Summary 0 292 152 () C-1 C-5i 144 C-3 C-4i C-4n 000 00 Average (max)Trip (max)(current) 58Background Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 313 0 Cont drill ahead f/ 12045' MD to 14843' MD. Samples have consisted of 90%-100% sst. Fi` . . Lime (lb/bbl) Density (ppg) out (sec/qt) Viscosity Cor Solids % 2.99 8-Feb-2014 12:00 AM Current Pump & Flow Data: 3560 Max ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP Depth Morning Report Report # 21 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to14843' 96% Rig Activity: 11.63 DOYON 15 Report For: Tools Xceed675, EcoScope 675, TeleScope 675, SonicVision 10.7211.31 Condition 2-4-BT-G-X-In-CT-TD Bit # 2 7.9 12.25Hal MM75D PDC 9.25 Size 3 2871' 160' Comments 152881' 12006' WOB WELD Mud RPM ECD (ppg) ml/30min 2.30 Mud Type Lst 100 Hydril 563 Type (lb/100ft2) 68.0 180 Smith MDSi616EBPX PDC FazePro NA 12006' 16889'17 Depth in / out 40.0 AK-AM-0900966765 $3,410.00 $72,910.00 Drill 8.75" Section PV 9125' Cement 0.902 Footage 72.50 Ss Hours Cht Silt Weight J. Keener / R. Wimmer ShClyst TuffGvlCoal cP 13 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: 477.7 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 14843' 17182' 2339' Max @ ft Current 16621'296.2 Date: in 220.1 TFABit Type Depth 69/3145 Ratio Oil / Water 17182' Alkal 0.969 Siltst 8.75 13 3/8" 550 130 Casing Summary Lithology (%) 9 5/8" BTC L-80 Set AtSize 178.9 X-65 Grade L-8011991' 20.00'' Cly * 24 hr Recap:Cont drill ahead f/ 14843' MD to 17182' MD. Samples have consisted of 100% sst. Fi` 0 Connection 330 100% Gas In Air=10,000 Units72Background(max)Trip (max)(current) Average 0 C-4n 000 0 C-3 C-5iC-4i Gas Summary 0 261 139 () 577 Max Gas: 2232 units Avg Gas: 577 units 8 14896'Minimum Depth C-5n 15403' C-2 2232 0 198 0 Units* 067081 109 434 907-685-0772Unit Phone: 89 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman 578 0 280240 C-1 Chromatograph (ppm) . . Lime (lb/bbl) Cly Size 178.9 X-65 Grade L-8011991' 20.00'' 8.75 13 3/8" 541 128 Casing Summary Lithology (%) 70 9 5/8" BTC Alkal 0.969 Siltst L-80 Set At Bit Type Depth 69/3147 Ratio Oil / Water 19201' 178.9 17182' 19201' 2019' Max @ ft Current 18583'251.6 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 573.6 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke (current) TuffGvlCoal cP 14 Ss Hours Cht Silt Weight J. Keener / R. Wimmer ShClyst in Cement 0.902 Footage 72.50 AK-AM-0900966765 $3,410.00 $76,320.00 Drill 8.75" Section PV 9125' 40.0 180 Smith MDSi616EBPX PDC FazePro NA 12006' 18951'19 Depth in / outTFA 2.85 Mud Type Lst 30 Hydril 563 Type (lb/100ft2) 68.0 Mud RPM ECD (ppg) ml/30min 152881' 12006' WOB WELD Comments 3 2871' 160' Condition 2-4-BT-G-X-In-CT-TD Bit # 2 8.1 12.25Hal MM75D PDC 9.30 Size 96% Rig Activity: DOYON 15 Report For: Tools Xceed675, EcoScope 675, TeleScope 675, SonicVision 10.7411.66 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17182' Depth Morning Report Report # 22 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP 9-Feb-2014 12:00 AM Current Pump & Flow Data: 3724 Max 3.71 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: 441 14 78907 C-1 Chromatograph (ppm) 907-685-0772Unit Phone: 91 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman 21990 1234 141 Units* 13 224 16 C-5n 17737' C-2 641 17909'Minimum Depth 242 Max Gas: 641 units Avg Gas: 242 units 8 Gas Summary 17 281 160 () C-4iC-3 000 0 C-5i Average (max)Trip (max)(current) 69Background 100% Gas In Air=10,000 UnitsConnection 294 25 C-4n 00 Cont drill ahead f/ 17182' MD to 19201' MD. Samples have consisted of 100% sst and 50%-70% sltst f/ 18800' MD to Fi` . . Lime (lb/bbl) * 24 hr Recap: Chromatograph (ppm) C-5n Grade L-8011991' 20.00'' 348 0 Cly 57764 907-685-0772Unit Phone: 83 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik/Kori Jo Plowman 24583 60 147 528 124 Units* Casing Summary Lithology (%) 10 9 5/8" BTC Size 178.9 Alkal 0.969 0 192 0 Siltst L-80 Set At 469 Bit Type Depth 68/3247 Ratio Oil / Water 20952' 20141' 2.4 C-2 8.75 13 3/8" C-1 20043'Minimum Depth 10 C-4i drill ahead to TD' expected some time tonight. 229 Max Gas: 469u Avg Gas: 229u Average 19201' 20952' 1751' Max @ ft Current 20358'79.1 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 394.0 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 245 134 (current) GvlCoal cP 14 Cement 180 Ss Hours Cht Silt Weight J. Keener / R. Wimmer ShClyst in 0.902 Footage 72.50 WOB WELD160'X-65 AK-AM-0900966765 Drill 8.75" Section PV 9125'152881' 12006' 40.0 Tuff 5013079 0 C-5i Smith MDSi616EBPX PDC FazePro NA 12006' 18951'19 Depth in / outTFA 2.65 Mud Type Lst 90 Hydril 563 Type (lb/100ft2) 68.0 Connection(max)Trip (max)(current) Mud RPM ECD (ppg) ml/30min 74Background Comments 100% Gas In Air=10,000 Units 252 0 C-4nC-3 3 2871' Condition 2-4-BT-G-X-In-CT-TD Bit # 2 7.8 12.25Hal MM75D PDC 9.25 Size 96% Rig Activity: DOYON 15 Report For: Tools Xceed675, EcoScope 675, TeleScope 675, SonicVision 10.7411.66 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to19201' Depth Morning Report Report # 23 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP 10-Feb-2014 12:00 AM Current Pump & Flow Data: 3771 Max 116 96 3.45 Cont drill ahead f/ 19201' MD to 20952' MD. Samples have consisted of 90% sst and 10% sltst . Cont. to Fi` Density (ppg) out (sec/qt) Viscosity Cor Solids % . . Lime (lb/bbl) Density (ppg) out (sec/qt) Viscosity Cor Solids % 3.25 11-Feb-2014 12:00 AM Current Pump & Flow Data: 3827 Max ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP Depth Morning Report Report # 24 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr Max Avg to 20952' 96% Rig Activity: DOYON 15 Report For: Tools Xceed675, EcoScope 675, TeleScope 675, SonicVision 10.74 11.66 Condition 2-4-BT-G-X-In-CT-TD Bit # 2 8.1 12.25 Hal MM75D PDC 9.30 Size 3 2871' Mud RPM ECD (ppg) ml/30min 2.50 Mud Type Lst 90 Hydril 563 Type (lb/100ft 2) 68.0 FazePro NA 12006' 21358'18 Depth in / out TFA Smith MDSi616EBPX PDC Comments AK-AM-0900966765 $3,410.00 $84,140.00 BROOH PV 9125' 15 2881' 12006' 72.50 WOB WELD X-65 40.0 Hours Cht Silt Weight J. Keener / R. Wimmer Sh Clyst in 0.902 cP 14 Cement 180 Footage Tuff Gvl Coal Ss Yesterday's Depth: Current Depth: 24 Hour Progress: 344.0 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 20952' 21358' 406' Max @ ft Current 21138'31.9 Date: 0.0 8.75 13 3/8" Bit Type Depth 67/33 49 Ratio Oil / Water 21358' Alkal 0.969 Siltst L-80 Set At 475 Casing Summary Lithology (%) 10 9 5/8" BTC Size 178.9 Cly Grade L-80 11991' 20.00'' (current) 160' * 24 hr Recap: Currently BROOH at a depth of 16,538' MD. TD Injection hole at a depth of 21,538' MD and a TVD of 3925'. Fi` 65 53 10,000 Units 147 0 35 Background (max) Trip (max) (current) Connection 100% Gas In Air = 90 45 0 C-5i C-4n C-3 30 73 Continuing to BROOH and then going to LD BHA #5 and P/U BHA # 6 for clean out run. 173 Max Gas: 582u Avg Gas: 173u Average Minimum Depth 12 C-4i 21051' C-2 C-1 582 0 107 0 Units* 10 17406 60 98 907-685-0772 Unit Phone: 53 Paul Kalenuik Maximum Report By: Logging Engineers: Paul Kalenuik/Kori Jo Plowman 236 0 46403 Gas Summary 0 139 81 Chromatograph (ppm) C-5n (current) . . Lime (lb/bbl) Grade L-80 11991' 20.00'' (current) 160' Cly 475 Casing Summary Lithology (%) 10 9 5/8" BTC Size 178.9 Alkal 0.969 Siltst L-80 Set At Bit Type Depth 67/33 48 Ratio Oil / Water 21358' 0.0 8.75 13 3/8" 21358' 21358' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gvl Coal Ss cP 15 Cement 180 Footage Tuff Hours Cht Silt Weight J. Keener / R. Wimmer Sh Clyst in 0.902 72.50 WOB WELD X-65 40.0 AK-AM-0900966765 $2,810.00 $86,950.00 BROOH PV 9125' 15 2881' 12006' Smith MDSi616EBPX PDC Comments FazePro NA 12006' 21358'16 Depth in / out TFA 2.50 Mud Type Lst 90 Hydril 563 Type (lb/100ft 2) 68.0 Mud RPM ECD (ppg) ml/30min 3 2871' Condition 2-4-BT-G-X-In-CT-TD Bit # 2 8.1 12.25 Hal MM75D PDC 9.25 Size 96% Rig Activity: DOYON 15 Report For: Tools Xceed675, EcoScope 675, TeleScope 675, SonicVision 10.20 10.40 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr Max Avg to 21358' Depth Morning Report Report # 25 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP 12-Feb-2014 12:00 AM Current Pump & Flow Data: 3827 Max 3.25 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: Chromatograph (ppm) C-5n (current) 0 0 0 Gas Summary 0 0 0 907-685-0772 Unit Phone: 0 Paul Kalenuik Maximum Report By: Logging Engineers: Paul Kalenuik/Kori Jo Plowman 0 0 0 Units* 10 0 0 0 0 0' C-2 C-1 Minimum Depth 0 C-4i Cont. BROOH. 0 Average 000 0 C-5i C-4n C-3 90 Connection 100% Gas In Air = (max) Trip (max) (current) 0Background 10,000 Units 0 0 0 0 Cont, BROOH as per K&M f/11080' t/9900'. Change out saver sub and all handling equip. to 4.5". Fi` . . Lime (lb/bbl) Density (ppg) out (sec/qt) Viscosity Cor Solids % 3.25 13-Feb-2014 12:00 AM Current Pump & Flow Data: 0 Max ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP Depth Morning Report Report # 26 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr Max Avg to 96% Rig Activity: DOYON 15 Report For: Tools 10.49 Condition 2-4-BT-G-X-In-CT-TD Bit # 2 7.1 12.25 Hal MM75D PDC 9.20 Size 3 2871' Mud RPM ECD (ppg) ml/30min 2.50 Mud Type Lst 90 Hydril 563 Type (lb/100ft 2) 68.0 FazePro NA 12006' 21358'17 21358' Depth in / out TFA 6 145 Smith MDSi616EBPX PDC Comments AK-AM-0900966765 $2,810.00 $89,760.00 RIH/CLEANOUT PV 9125' 15 2881' 12006' 27.40 9352' 72.50 WOB WELD X-65 40.0 Hours Cht Silt Weight J. Keener / R. Wimmer Sh Clyst in 0.902 cP 15 Cement 180 Footage Tuff Gvl Coal Ss Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 21358' 21358' 0' Max @ ft Current Date: 0.0 8.75 13 3/8" Bit Type Depth 67/33 48 Ratio Oil / Water Alkal 0.969 Siltst L-80 Set At 0 0 Casing Summary Lithology (%) 10 9 5/8" BTC Size 178.9 Cly Grade L-80 11991' 20.00'' (current) 160' * 24 hr Recap: Make up hole opener BHA and proceed to RIH hole. Currently at a depth of 5261'MD @12:56am. Fi` 0 0 10,000 Units 0 0 0Background (max) Trip (max) (current) Connection 100% Gas In Air = 90 0 0 C-5i C-4n C-3 00 0 Average Minimum Depth 0 C-4i 0' C-2 C-1 0 0 0 0 Units* 10 0 0 0 907-685-0772 Unit Phone: 0 Paul Kalenuik Maximum Report By: Logging Engineers: Paul Kalenuik/Kori Jo Plowman 0 0 0 Gas Summary 0 0 0 Chromatograph (ppm) C-5n (current) . . Lime (lb/bbl) Grade L-80 11991' 20.00'' (current) 160' Cly 123 29 Casing Summary Lithology (%) 10 9 5/8" BTC Size 178.9 Alkal 0.969 Siltst L-80 Set At Bit Type Depth 67/33 50 Ratio Oil / Water 0.0 8.75 13 3/8" 21358' 21358' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gvl Coal Ss cP 16 Cement 180 Footage Tuff Hours Cht Silt Weight J. Keener / R. Wimmer Sh Clyst in 0.902 27.40 9352' 72.50 WOB WELD X-65 40.0 AK-AM-0900966765 $2,810.00 $92,570.00 Pumping Breaker PV 9125' 15 2881' 12006' Smith MDSi616EBPX PDC Comments FazePro NA 12006' 21358'16 21358' Depth in / out TFA 6 145 2.50 Mud Type Lst 90 Hydril 563 Type (lb/100ft 2) 68.0 Mud RPM ECD (ppg) ml/30min 3 2871' Condition 2-4-BT-G-X-In-CT-TD Bit # 2 7.1 12.25 Hal MM75D PDC 9.25 Size 96% Rig Activity: DOYON 15 Report For: Tools 10.49 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr Max Avg to Depth Morning Report Report # 27 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP 14-Feb-2014 12:00 AM Current Pump & Flow Data: 362 Max 3.25 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: Chromatograph (ppm) C-5n (current) 0 0 0 Gas Summary 0 0 0 907-685-0772 Unit Phone: 0 Paul Kalenuik Maximum Report By: Logging Engineers: Paul Kalenuik/Kori Jo Plowman 0 0 0 Units* 10 0 0 0 0 0' C-2 C-1 Minimum Depth 0 C-4i to 20369. Wash and ream last stand down f/21276' t/21358'. Circulate and condition mud for displacement. Perform exhale test. 0 Average 000 0 C-5i C-4n C-3 90 Connection 100% Gas In Air = (max) Trip (max) (current) 0Background 10,000 Units 0 0 Test all lines, begin displacement. 0 0 RIH t/21276' MD, filling every 20 stds. Tight spot @20251' pull back to 20182', wash and ream until clear Fi` . . Lime (lb/bbl) Density (ppg) out (sec/qt) Viscosity Cor Solids % 3.25 15-Feb-2014 12:00 AM Current Pump & Flow Data: 5 Max 0-0-CT-M-X-I-NO-TD ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP Depth Morning Report Report # 28 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr Max Avg to 96% Rig Activity: DOYON 15 Report For: Tools 10.49 Condition 2-4-BT-G-X-In-CT-TD Bit # 2 7.1 12.25 Hal MM75D PDC 9.25 Size 3 2871' Mud RPM ECD (ppg) ml/30min 2.50 Mud Type Lst 90 Hydril 563 Type (lb/100ft 2) 68.0 FazePro NA 12006' 21358'14 21358' Depth in / out TFA 6 145 Smith MDSi616EBPX PDC Comments AK-AM-0900966765 $2,810.00 $95,380.00 POOH on Elevators PV 9125' 15 2881' 12006' 27.40 9352' 72.50 WOB WELD X-65 40.0 Hours Cht Silt Weight J. Keener / R. Wimmer Sh Clyst in 0.902 cP 17 Cement 180 Footage Tuff Gvl Coal Ss Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 21358' 21358' 0' Max @ ft Current Date: 0.0 8.75 13 3/8" Bit Type Depth 67/33 50 Ratio Oil / Water Alkal 0.969 Siltst L-80 Set At 0 0 Casing Summary Lithology (%) 10 9 5/8" BTC Size 178.9 Cly Grade L-80 11991' 20.00'' (current) 160' * 24 hr Recap: Currently POOH at a depth of 5680'MD. Monitoring gas, SPP, and flows. Fi` 0 0 10,000 Units 0 0 0Background (max) Trip (max) (current) 62 Connection 100% Gas In Air = 90 0 0 C-5i C-4n C-3 00 0 Average Minimum Depth 0 C-4i 0' C-2 C-1 0 0 0 0 Units* 10 0 0 0 907-685-0772 Unit Phone: 0 Paul Kalenuik Maximum Report By: Logging Engineers: Paul Kalenuik/Kori Jo Plowman 0 0 0 Gas Summary 0 0 0 Chromatograph (ppm) C-5n (current) . . Lime (lb/bbl) Grade L-80 11991' 20.00'' (current) 160' Cly 0 0 Casing Summary Lithology (%) 10 9 5/8" BTC Size 178.9 Alkal 0.969 Siltst L-80 Set At Bit Type Depth 27 Ratio Oil / Water 0.0 8.75 13 3/8" 21358' 21358' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gvl Coal Ss cP Cement 180 Footage Tuff Hours Cht Silt Weight J. Keener / R. Wimmer Sh Clyst in 0.902 27.40 9352' 72.50 WOB WELD X-65 40.0 AK-AM-0900966765 $2,810.00 $98,190.00 Running 4.5" liner PV 9125' 15 2881' 12006' Smith MDSi616EBPX PDC Comments FazePro 12006' 21358' 21358' Depth in / out TFA 6 145 Mud Type Lst 90 Hydril 563 Type (lb/100ft 2) 68.0 Mud RPM ECD (ppg) ml/30min 3 2871' Condition 2-4-BT-G-X-In-CT-TD Bit # 2 12.25 Hal MM75D PDC 9.20 Size 96% Rig Activity: DOYON 15 Report For: Tools 10.49 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr Max Avg to Depth Morning Report Report # 29 Customer: Well: Area: Location: Rig: SI11-FN6 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min YP 16-Feb-2014 12:00 AM Current Pump & Flow Data: 5 Max 0-0-CT-M-X-I-NO-TD Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: Chromatograph (ppm) C-5n (current) 0 0 0 Gas Summary 0 0 0 907-685-0772 Unit Phone: 0 Paul Kalenuik Maximum Report By: Logging Engineers: Paul Kalenuik/Kori Jo Plowman 0 0 0 Units* 10 0 0 0 0 0' C-2 C-1 Minimum Depth 0 C-4i 0 Average 000 0 C-5i C-4n C-3 90 5 Connection 100% Gas In Air = (max) Trip (max) (current) 0Background 10,000 Units 0 0 0 0 Running 4.5" liner at a depth of 9,406'MD @01:26 am. 220 JTS total run. R/D casing equip. Fi` WELL INFORMATION Created On : Mar 20 2014 Customer :ENI Petroleum Well Name :SI11-FN6 Job Number :AK-XX-0900966765 Platform :Spy Island Field Name :Nikaitchuq Country :USA Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 327.00 0.00 0.00 N 0.00 E 0.00 0.00 40.83 0.00 327.00 40.83 0.00 N 0.00 E 0.00 0.00 117.24 0.19 16.97 117.24 0.12 N 0.04 E 0.07 0.25 131.80 0.21 273.97 131.80 0.15 N 0.02 E 0.10 2.15 148.05 0.25 123.06 148.05 0.13 N 0.02 E 0.09 2.74 161.16 0.31 291.79 161.16 0.13 N 0.01 E 0.09 4.25 190.97 0.26 354.01 190.97 0.22 N 0.07 W 0.22 1.00 227.63 0.31 313.14 227.63 0.37 N 0.15 W 0.39 0.56 268.13 0.25 302.53 268.13 0.50 N 0.31 W 0.58 0.20 299.20 0.47 336.72 299.20 0.65 N 0.42 W 0.77 0.96 330.15 1.09 334.16 330.14 1.03 N 0.59 W 1.17 2.01 363.49 1.29 345.34 363.48 1.68 N 0.83 W 1.82 0.92 394.54 1.65 334.65 394.52 2.42 N 1.11 W 2.57 1.45 427.27 2.08 337.18 427.23 3.40 N 1.54 W 3.59 1.34 456.34 2.34 332.33 456.28 4.41 N 2.02 W 4.67 1.10 489.06 3.07 327.38 488.96 5.74 N 2.80 W 6.19 2.34 520.21 3.13 327.90 520.07 7.16 N 3.70 W 7.86 0.21 549.23 3.43 326.94 549.04 8.56 N 4.60 W 9.51 1.05 582.49 3.28 325.23 582.24 10.17 N 5.68 W 11.44 0.54 641.90 5.13 327.52 641.49 13.81 N 8.08 W 15.77 3.13 676.10 6.46 323.94 675.51 16.66 N 10.03 W 19.20 4.03 735.33 8.37 324.48 734.25 22.86 N 14.50 W 26.82 3.23 768.15 9.88 323.83 766.65 27.08 N 17.55 W 32.01 4.61 828.78 11.70 322.84 826.21 36.18 N 24.33 W 43.34 3.02 922.16 16.71 324.62 916.70 54.68 N 37.83 W 66.19 5.38 979.66 19.14 325.31 971.41 69.17 N 47.99 W 83.82 4.24 1073.04 20.96 327.17 1,059.12 95.80 N 65.76 W 115.63 2.06 1166.54 23.06 328.52 1,145.81 125.47 N 84.39 W 150.32 2.31 1259.91 24.66 328.24 1,231.19 157.63 N 104.19 W 187.67 1.72 1353.33 30.54 328.67 1,313.95 194.50 N 126.81 W 230.45 6.30 1446.76 31.55 329.63 1,393.99 235.87 N 151.51 W 278.00 1.20 INSITE V8.0.20 Page 1Job No:AK-XX-0900966765 Well Name:SI11-FN6 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1540.13 30.36 328.74 1,474.06 277.12 N 176.11 W 325.39 1.37 1633.45 30.29 327.93 1,554.62 317.22 N 200.84 W 371.99 0.44 1726.88 31.49 327.07 1,634.79 357.67 N 226.62 W 419.53 1.37 1820.30 30.45 325.57 1,714.89 397.68 N 253.27 W 467.29 1.39 1913.65 31.96 325.99 1,794.74 437.67 N 280.46 W 515.40 1.63 2007.00 34.28 325.77 1,872.91 479.89 N 309.07 W 566.12 2.49 2100.38 36.66 325.07 1,948.96 524.49 N 339.83 W 620.05 2.59 2193.80 39.47 324.78 2,022.50 571.63 N 372.93 W 677.42 3.01 2287.23 43.04 324.97 2,092.73 622.01 N 408.37 W 738.78 3.82 2380.62 45.32 325.51 2,159.70 675.48 N 445.47 W 803.58 2.47 2473.98 47.34 326.88 2,224.16 731.59 N 483.03 W 870.69 2.41 2567.40 51.27 326.36 2,285.07 790.72 N 522.00 W 941.01 4.23 2660.88 53.37 325.57 2,342.20 852.02 N 563.41 W 1014.58 2.34 2754.23 55.92 325.30 2,396.21 914.71 N 606.60 W 1090.34 2.74 2797.43 56.96 325.63 2,420.10 944.37 N 627.01 W 1126.17 2.49 2895.61 58.74 325.35 2,472.34 1,012.86 N 674.10 W 1208.89 1.83 2919.03 60.04 325.28 2,484.26 1,029.44 N 685.57 W 1228.96 5.56 3012.42 63.71 324.54 2,528.28 1,096.81 N 732.92 W 1310.99 3.99 3105.85 65.11 325.92 2,568.64 1,166.03 N 780.97 W 1394.88 2.00 3199.15 65.91 327.03 2,607.31 1,236.81 N 827.86 W 1479.22 1.38 3292.51 68.70 327.86 2,643.33 1,309.40 N 874.19 W 1564.59 3.10 3385.91 72.15 327.98 2,674.62 1,383.96 N 920.92 W 1651.71 3.70 3479.32 73.82 327.29 2,701.95 1,459.40 N 968.74 W 1740.21 1.92 3572.72 77.17 327.08 2,725.34 1,535.38 N 1,017.74 W 1829.88 3.59 3666.14 81.19 327.47 2,742.88 1,612.56 N 1,067.33 W 1920.86 4.32 3759.55 80.74 326.00 2,757.55 1,689.69 N 1,117.93 W 2012.45 1.63 3852.91 81.33 324.25 2,772.09 1,765.35 N 1,170.66 W 2104.27 1.96 3946.24 83.33 324.95 2,784.55 1,840.74 N 1,224.23 W 2196.45 2.27 4039.67 80.01 324.69 2,798.08 1,916.29 N 1,277.49 W 2288.53 3.56 4133.06 82.08 324.68 2,812.62 1,991.56 N 1,330.81 W 2380.46 2.22 4226.54 81.24 324.37 2,826.18 2,066.88 N 1,384.49 W 2472.64 0.96 4320.02 82.03 325.26 2,839.78 2,142.47 N 1,437.78 W 2564.78 1.27 4413.36 82.35 325.02 2,852.46 2,218.35 N 1,490.63 W 2656.86 0.43 4506.82 81.23 325.11 2,865.81 2,294.18 N 1,543.60 W 2748.98 1.20 4600.33 80.15 324.71 2,880.94 2,369.69 N 1,596.65 W 2840.90 1.23 4693.77 81.20 325.52 2,896.08 2,445.32 N 1,649.38 W 2932.72 1.41 4787.09 81.36 325.45 2,910.23 2,521.33 N 1,701.65 W 3024.52 0.19 4880.55 81.42 327.43 2,924.22 2,598.32 N 1,752.73 W 3116.31 2.10 4973.84 80.56 324.12 2,938.83 2,674.50 N 1,804.54 W 3207.95 3.62 5067.20 81.67 323.40 2,953.25 2,748.89 N 1,859.07 W 3299.98 1.41 5160.50 80.88 323.63 2,967.40 2,823.04 N 1,913.91 W 3392.01 0.88 5253.87 83.34 321.80 2,980.22 2,896.61 N 1,969.93 W 3484.37 3.27 5347.29 81.37 324.20 2,992.65 2,970.54 N 2,025.65 W 3576.81 3.31 5440.63 80.65 327.42 3,007.24 3,046.79 N 2,077.45 W 3668.49 3.49 5533.96 79.89 328.74 3,023.01 3,124.87 N 2,126.09 W 3759.54 1.61 INSITE V8.0.20 Page 2Job No:AK-XX-0900966765 Well Name:SI11-FN6 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 5627.30 81.18 326.57 3,038.36 3,202.64 N 2,175.34 W 3850.75 2.68 5720.75 81.55 325.60 3,052.40 3,279.31 N 2,226.89 W 3942.60 1.10 5814.08 82.14 329.07 3,065.64 3,357.08 N 2,276.75 W 4034.18 3.73 5907.39 80.40 327.37 3,079.80 3,435.47 N 2,325.31 W 4125.43 2.59 6000.80 79.46 329.15 3,096.14 3,513.68 N 2,373.70 W 4216.41 2.13 6094.16 81.45 326.51 3,111.62 3,591.60 N 2,422.71 W 4307.58 3.51 6187.49 80.18 325.25 3,126.52 3,667.87 N 2,474.39 W 4399.20 1.90 6280.94 82.27 324.06 3,140.77 3,743.20 N 2,527.82 W 4491.23 2.57 6374.29 81.69 324.52 3,153.80 3,818.26 N 2,581.77 W 4583.39 0.79 6467.67 81.43 325.11 3,167.50 3,893.75 N 2,635.00 W 4675.42 0.68 6561.11 80.32 325.52 3,182.32 3,969.61 N 2,687.50 W 4767.25 1.26 6654.60 81.62 326.00 3,196.99 4,045.94 N 2,739.44 W 4859.10 1.48 6748.28 81.90 326.41 3,210.42 4,122.98 N 2,791.01 W 4951.24 0.53 6841.32 81.33 328.92 3,223.99 4,200.75 N 2,840.24 W 5042.43 2.74 6934.69 80.56 329.38 3,238.68 4,279.91 N 2,887.53 W 5133.43 0.96 7027.98 80.93 328.28 3,253.69 4,358.69 N 2,935.18 W 5224.38 1.23 7121.34 80.96 328.09 3,268.38 4,437.03 N 2,983.79 W 5315.61 0.20 7214.68 80.82 328.52 3,283.16 4,515.45 N 3,032.21 W 5406.77 0.48 7308.03 80.01 328.60 3,298.70 4,593.98 N 3,080.22 W 5497.76 0.87 7401.38 81.11 326.25 3,314.02 4,671.57 N 3,129.80 W 5589.04 2.75 7494.79 81.48 324.54 3,328.16 4,747.57 N 3,182.23 W 5680.94 1.85 7588.61 81.43 324.78 3,342.10 4,823.25 N 3,235.90 W 5773.40 0.26 7681.51 81.62 324.45 3,355.79 4,898.16 N 3,289.11 W 5864.97 0.41 7774.79 81.59 324.45 3,369.41 4,973.24 N 3,342.76 W 5956.95 0.03 7868.13 81.17 324.88 3,383.40 5,048.53 N 3,396.13 W 6048.91 0.64 7961.41 82.03 326.58 3,397.02 5,124.79 N 3,448.09 W 6140.71 2.02 8055.04 81.39 323.90 3,410.52 5,200.90 N 3,500.91 W 6232.94 2.91 8148.27 81.31 323.95 3,424.55 5,275.39 N 3,555.18 W 6324.88 0.10 8241.76 81.54 323.20 3,438.49 5,349.78 N 3,610.07 W 6417.13 0.83 8335.14 81.12 323.89 3,452.56 5,424.02 N 3,664.93 W 6509.25 0.86 8428.55 81.66 324.28 3,466.55 5,498.82 N 3,719.10 W 6601.36 0.71 8521.86 81.49 324.65 3,480.22 5,573.94 N 3,772.75 W 6693.37 0.43 8615.27 80.65 324.45 3,494.72 5,649.11 N 3,826.27 W 6785.34 0.92 8708.60 80.89 323.99 3,509.69 5,723.84 N 3,880.13 W 6877.19 0.55 8801.78 80.16 326.16 3,525.03 5,799.19 N 3,932.74 W 6968.72 2.43 8895.11 80.04 326.78 3,541.08 5,875.83 N 3,983.53 W 7060.05 0.67 8988.42 79.74 326.12 3,557.46 5,952.39 N 4,034.30 W 7151.30 0.77 9081.71 81.74 326.82 3,572.47 6,029.14 N 4,085.15 W 7242.76 2.27 9175.07 82.68 327.32 3,585.12 6,106.77 N 4,135.43 W 7334.53 1.14 9268.58 80.77 326.12 3,598.58 6,184.13 N 4,186.21 W 7426.40 2.41 9362.05 79.66 327.33 3,614.46 6,261.14 N 4,236.74 W 7517.85 1.74 9455.35 80.41 327.59 3,630.61 6,338.60 N 4,286.17 W 7608.93 0.85 9548.78 81.69 327.89 3,645.14 6,416.65 N 4,335.43 W 7700.35 1.41 9642.23 83.59 327.56 3,657.12 6,495.00 N 4,384.92 W 7792.16 2.06 9735.61 81.54 328.35 3,669.20 6,573.48 N 4,434.05 W 7883.83 2.35 INSITE V8.0.20 Page 3Job No:AK-XX-0900966765 Well Name:SI11-FN6 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 9829.01 81.63 326.52 3,682.87 6,651.35 N 4,483.78 W 7975.42 1.94 9922.39 81.01 328.97 3,696.96 6,729.41 N 4,533.04 W 8066.85 2.68 10015.89 80.88 329.01 3,711.68 6,808.54 N 4,580.61 W 8158.02 0.15 10109.56 80.76 327.11 3,726.62 6,887.01 N 4,629.53 W 8249.54 2.01 10202.66 82.70 325.04 3,740.02 6,963.45 N 4,680.94 W 8341.12 3.03 10296.05 83.03 323.86 3,751.62 7,038.84 N 4,734.82 W 8433.49 1.30 10389.39 82.48 321.60 3,763.39 7,112.52 N 4,790.89 W 8525.96 2.47 10482.80 81.05 320.36 3,776.77 7,184.34 N 4,849.09 W 8618.39 2.02 10576.23 80.68 320.50 3,791.60 7,255.45 N 4,907.85 W 8710.63 0.42 10669.61 81.44 320.15 3,806.11 7,326.45 N 4,966.74 W 8802.87 0.89 10763.00 80.26 320.53 3,820.96 7,397.43 N 5,025.59 W 8895.07 1.33 10856.35 80.46 321.21 3,836.59 7,468.82 N 5,083.67 W 8987.09 0.75 10949.73 80.34 322.48 3,852.17 7,541.22 N 5,140.55 W 9079.10 1.35 11043.10 81.90 322.43 3,866.58 7,614.36 N 5,196.76 W 9171.26 1.67 11136.58 82.64 321.89 3,879.15 7,687.51 N 5,253.59 W 9263.81 0.98 11229.97 83.07 321.36 3,890.77 7,760.16 N 5,311.11 W 9356.43 0.73 11323.33 82.98 320.86 3,902.11 7,832.28 N 5,369.29 W 9449.08 0.54 11416.75 85.34 320.39 3,911.61 7,904.12 N 5,428.25 W 9542.00 2.58 11510.23 85.52 321.28 3,919.06 7,976.37 N 5,487.10 W 9635.17 0.97 11603.58 85.81 319.92 3,926.12 8,048.29 N 5,546.18 W 9728.24 1.49 11696.96 85.95 322.76 3,932.83 8,121.01 N 5,604.36 W 9821.34 3.04 11790.36 85.24 323.08 3,940.00 8,195.31 N 5,660.50 W 9914.33 0.83 11883.75 85.39 323.27 3,947.63 8,269.81 N 5,716.29 W 10007.25 0.26 11960.90 85.32 322.39 3,953.88 8,331.09 N 5,762.75 W 10084.05 1.14 12006.00 85.32 322.39 3,957.56 8,366.69 N 5,790.18 W 10128.95 0.00 12045.19 86.71 324.90 3,960.28 8,398.18 N 5,813.35 W 10167.96 7.31 12071.96 88.11 325.00 3,961.49 8,420.07 N 5,828.71 W 10194.60 5.24 12165.39 87.44 325.04 3,965.12 8,496.56 N 5,882.23 W 10287.58 0.72 12258.77 91.16 325.02 3,966.26 8,573.06 N 5,935.74 W 10380.56 3.98 12352.12 90.33 325.34 3,965.05 8,649.69 N 5,989.04 W 10473.50 0.95 12445.55 89.57 324.28 3,965.13 8,726.05 N 6,042.88 W 10566.58 1.40 12538.94 90.54 322.50 3,965.04 8,801.01 N 6,098.57 W 10659.79 2.17 12632.37 90.65 321.43 3,964.07 8,874.59 N 6,156.14 W 10753.15 1.15 12725.67 90.32 319.54 3,963.28 8,946.56 N 6,215.50 W 10846.43 2.06 12819.03 90.28 318.17 3,962.79 9,016.86 N 6,276.92 W 10939.78 1.47 12912.43 89.92 317.72 3,962.63 9,086.21 N 6,339.48 W 11033.12 0.62 13005.84 89.95 318.68 3,962.73 9,155.85 N 6,401.74 W 11126.49 1.03 13099.24 90.07 319.02 3,962.71 9,226.18 N 6,463.20 W 11219.88 0.39 13192.66 89.90 319.19 3,962.74 9,296.79 N 6,524.36 W 11313.29 0.26 13286.07 90.66 319.88 3,962.28 9,367.86 N 6,584.98 W 11406.70 1.10 13379.43 90.49 320.90 3,961.35 9,439.78 N 6,644.50 W 11500.04 1.11 13472.76 90.53 321.75 3,960.52 9,512.64 N 6,702.82 W 11593.34 0.91 13566.19 90.30 320.43 3,959.84 9,585.34 N 6,761.50 W 11686.74 1.43 13659.58 90.12 320.06 3,959.50 9,657.13 N 6,821.23 W 11780.13 0.44 13753.06 88.12 319.22 3,960.93 9,728.35 N 6,881.75 W 11873.59 2.32 INSITE V8.0.20 Page 4Job No:AK-XX-0900966765 Well Name:SI11-FN6 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 13846.54 87.96 318.76 3,964.13 9,798.85 N 6,943.06 W 11967.01 0.52 13939.88 88.66 318.80 3,966.88 9,869.03 N 7,004.54 W 12060.29 0.75 14033.17 89.48 319.40 3,968.40 9,939.53 N 7,065.61 W 12153.56 1.09 14126.80 89.56 320.14 3,969.18 10,011.01 N 7,126.08 W 12247.18 0.79 14220.24 88.51 320.27 3,970.75 10,082.79 N 7,185.87 W 12340.61 1.13 14313.56 89.53 322.28 3,972.35 10,155.58 N 7,244.24 W 12433.88 2.42 14407.02 87.59 318.57 3,974.70 10,227.58 N 7,303.75 W 12527.29 4.48 14500.31 90.66 318.27 3,976.12 10,297.35 N 7,365.65 W 12620.52 3.31 14593.67 90.82 315.33 3,974.92 10,365.39 N 7,429.54 W 12713.73 3.15 14686.97 91.84 312.70 3,972.75 10,430.20 N 7,496.62 W 12806.51 3.02 14780.34 90.31 311.64 3,971.00 10,492.86 N 7,565.80 W 12899.02 1.99 14873.76 89.72 310.96 3,970.98 10,554.52 N 7,635.99 W 12991.39 0.96 14967.10 90.37 311.11 3,970.90 10,615.80 N 7,706.39 W 13083.63 0.71 15060.43 90.27 310.98 3,970.38 10,677.08 N 7,776.78 W 13175.85 0.18 15153.77 90.22 311.17 3,969.98 10,738.41 N 7,847.14 W 13268.09 0.21 15247.22 90.78 312.18 3,969.17 10,800.54 N 7,916.94 W 13360.58 1.24 15340.38 92.19 312.42 3,966.75 10,863.22 N 7,985.82 W 13452.90 1.54 15433.91 91.79 312.23 3,963.51 10,926.16 N 8,054.93 W 13545.56 0.47 15527.73 90.04 311.50 3,962.01 10,988.76 N 8,124.79 W 13638.45 2.02 15620.68 91.87 313.56 3,960.46 11,051.58 N 8,193.27 W 13730.62 2.96 15714.01 92.13 313.73 3,957.20 11,115.95 N 8,260.76 W 13823.34 0.33 15807.46 90.18 312.30 3,955.32 11,179.69 N 8,329.07 W 13916.10 2.59 15900.81 89.95 313.88 3,955.21 11,243.46 N 8,397.24 W 14008.79 1.71 15994.19 89.98 313.06 3,955.27 11,307.70 N 8,465.01 W 14101.59 0.88 16087.63 90.16 311.97 3,955.15 11,370.84 N 8,533.88 W 14194.26 1.18 16181.12 90.95 311.04 3,954.25 11,432.79 N 8,603.89 W 14286.75 1.31 16274.45 90.54 312.14 3,953.03 11,494.74 N 8,673.69 W 14379.09 1.26 16367.84 90.65 312.84 3,952.06 11,557.82 N 8,742.55 W 14471.71 0.76 16461.21 91.29 312.33 3,950.48 11,620.99 N 8,811.29 W 14564.31 0.88 16554.50 90.86 311.21 3,948.73 11,683.12 N 8,880.85 W 14656.65 1.29 16647.86 91.04 309.72 3,947.19 11,743.70 N 8,951.87 W 14748.74 1.61 16741.20 91.02 308.82 3,945.51 11,802.77 N 9,024.12 W 14840.47 0.96 16834.55 90.71 308.70 3,944.10 11,861.21 N 9,096.90 W 14932.06 0.36 16928.01 89.03 308.46 3,944.31 11,919.49 N 9,169.96 W 15023.71 1.82 17021.31 88.11 309.42 3,946.64 11,978.11 N 9,242.50 W 15115.29 1.42 17114.71 88.09 310.99 3,949.74 12,038.36 N 9,313.80 W 15207.31 1.68 17208.03 88.17 311.82 3,952.78 12,100.05 N 9,383.75 W 15299.56 0.89 17301.32 87.53 311.79 3,956.28 12,162.19 N 9,453.24 W 15391.86 0.69 17394.65 91.75 315.28 3,956.87 12,226.45 N 9,520.88 W 15484.58 5.87 17487.93 89.67 314.05 3,955.71 12,292.01 N 9,587.21 W 15577.46 2.59 17581.32 89.38 311.00 3,956.49 12,355.13 N 9,656.03 W 15670.07 3.28 17674.79 89.28 310.23 3,957.58 12,415.97 N 9,726.97 W 15762.32 0.83 17768.12 89.63 309.96 3,958.47 12,476.08 N 9,798.37 W 15854.29 0.47 17861.66 91.13 312.29 3,957.85 12,537.59 N 9,868.82 W 15946.73 2.96 17955.07 90.70 309.53 3,956.35 12,598.75 N 9,939.40 W 16038.98 2.99 INSITE V8.0.20 Page 5Job No:AK-XX-0900966765 Well Name:SI11-FN6 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 18048.38 90.25 309.07 3,955.58 12,657.85 N 10,011.60 W 16130.71 0.69 18141.79 91.50 309.26 3,954.16 12,716.83 N 10,084.01 W 16222.48 1.35 18235.12 91.22 308.94 3,951.94 12,775.68 N 10,156.42 W 16314.14 0.46 18328.30 91.98 308.10 3,949.34 12,833.68 N 10,229.30 W 16405.46 1.22 18421.63 89.31 305.25 3,948.29 12,889.41 N 10,304.13 W 16496.30 4.18 18515.45 92.19 306.45 3,947.06 12,944.35 N 10,380.16 W 16587.31 3.33 18608.01 92.85 309.67 3,942.99 13,001.35 N 10,452.96 W 16677.81 3.55 18701.59 90.57 307.03 3,940.20 13,059.37 N 10,526.31 W 16769.45 3.73 18795.10 92.05 308.56 3,938.06 13,116.66 N 10,600.17 W 16860.86 2.28 18888.57 91.73 311.05 3,934.98 13,176.46 N 10,671.94 W 16952.83 2.68 18981.87 92.51 314.43 3,931.52 13,239.73 N 10,740.40 W 17045.33 3.72 19075.30 92.62 316.43 3,927.34 13,306.22 N 10,805.90 W 17138.38 2.14 19168.75 92.41 316.19 3,923.24 13,373.73 N 10,870.39 W 17231.56 0.34 19262.13 90.28 315.51 3,921.05 13,440.70 N 10,935.41 W 17324.68 2.39 19355.53 90.50 313.28 3,920.41 13,506.04 N 11,002.14 W 17417.65 2.40 19448.91 90.38 310.74 3,919.70 13,568.53 N 11,071.52 W 17510.14 2.72 19542.41 90.44 310.76 3,919.03 13,629.56 N 11,142.35 W 17602.46 0.07 19635.77 90.57 310.78 3,918.20 13,690.52 N 11,213.05 W 17694.64 0.14 19729.18 91.00 310.89 3,916.92 13,751.60 N 11,283.72 W 17786.88 0.48 19822.44 91.62 311.01 3,914.79 13,812.70 N 11,354.14 W 17878.99 0.68 19915.91 91.81 310.58 3,911.99 13,873.75 N 11,424.87 W 17971.25 0.50 20009.32 92.14 311.26 3,908.78 13,934.89 N 11,495.41 W 18063.46 0.81 20102.75 90.93 312.00 3,906.27 13,996.94 N 11,565.22 W 18155.89 1.52 20196.13 88.04 311.88 3,907.11 14,059.34 N 11,634.67 W 18248.37 3.10 20289.52 87.14 310.95 3,911.04 14,121.06 N 11,704.64 W 18340.66 1.39 20382.87 86.93 310.72 3,915.87 14,182.02 N 11,775.17 W 18432.73 0.33 20476.25 87.73 309.79 3,920.22 14,242.29 N 11,846.36 W 18524.69 1.31 20569.67 88.09 310.02 3,923.62 14,302.18 N 11,917.97 W 18616.64 0.46 20663.10 88.40 310.28 3,926.49 14,362.40 N 11,989.36 W 18708.69 0.43 20756.49 88.99 308.92 3,928.61 14,421.91 N 12,061.29 W 18800.55 1.59 20849.85 92.08 309.94 3,927.74 14,481.19 N 12,133.39 W 18892.35 3.49 20943.27 93.76 310.41 3,922.98 14,541.38 N 12,204.68 W 18984.32 1.87 21036.75 93.86 312.20 3,916.77 14,602.95 N 12,274.74 W 19076.54 1.91 21130.10 89.23 310.73 3,914.25 14,664.72 N 12,344.65 W 19168.83 5.20 21223.48 89.00 310.53 3,915.70 14,725.52 N 12,415.51 W 19260.99 0.33 21292.48 87.57 309.87 3,917.76 14,770.03 N 12,468.19 W 19328.97 2.28 21358.00 87.57 309.87 3,920.54 14,811.99 N 12,518.43 W 19393.44 0.00 SURVEY FOOTER INSITE V8.0.20 Page 6Job No:AK-XX-0900966765 Well Name:SI11-FN6 Survey Report DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 319.87 degrees (True) - A total correction of 19.58 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 21,358.00 feet is 19,393.46 feet along 319.80 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.20 Page 7Job No:AK-XX-0900966765 Well Name:SI11-FN6 Survey Report