Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-154Eni US Operating Co, Inc
WELL LOG/DATA TRANSMITTAL
To:333 W. 7th Ave, Anchorage, AK 99501 March 6, 2023
Well:OP10-09
LWD/MWD Logs
PDF LAS DLIS Excel
Mudlogs
E-line logs
9-5/8"Multiginger Caliper Log x x
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Edgar Pinzon
Mail: edgar.pinzon@eni.com
Received By: ___________________________________Date:____________
Eni US Operating Co, Inc.
WELL LOG TRANSMITTAL 9905671007
To: Alaska Oil and Gas Conservation Comm.
Attn.: Natural Resource Technician
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Multi Finger Caliper and Leak Detect Log with ACX: OP10-09 L1
Run Date: 5/4/2019
21 X154
30 87 2
May 30, 2019
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
OP10-09 Ll
Digital Data in LAS format, Digital Log File 1 CD Rom
50-029-23439-60 RECEIVED
JUN 0 3 2019
AOGCC
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Halliburton
Wireline & Perforating
Attn: Fanny Sari
6900 Arctic Blvd.
Anchorage, Alaska 99518
Office: 907-275-2605
FRS_ANC@halliburton.com and Amiad.Chaudhry@eni.com
Date: Dbl03l1q
Signed:
Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Nabors 245
Date: December 17, 2013
Surface Data Logging
End of Well Report
OP10-09L1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Formation Tops
6. Mud Record
7. Bit Record
8. Morning Reports
9. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: ENI Petroleum
Rig: Nabors 245
Well: OP10-09L1
Field: Nikaitchuq Project
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-029-23439-60-00
Sperry Job Number: AK-AM-0900918317
Job Start Date: 16 November 2013
Spud Date: 27 November 2013
Total Depth Date: 05 December 2013
Total Depth: 19,145’ MD, 3,596.3’ TVD
North Reference: True
Declination: 19.615°
Dip Angle: 81.022°
Total Field Strength: 57628.341 nT
Date Of Magnetic Data: 19 November 2013
Wellhead Coordinates N: North 70° 30’ 39.68839”
Wellhead Coordinates W: West 149° 51’ 48.33536“
Drill Floor Elevation 53.13’
Ground Elevation: 12.20’
Permanent Datum: Mean Sea Level
SDL Engineers: Emil Opitz / Douglas Acker
Company Geologist: Andrew Buchanan
Company Representatives: Bruce Simonson / Ben Perry
SSDS Unit Number: 121
DAILY SUMMARY
11/17/2013
Complete Rig up on OP10-09L1. Transfer production H2O into pits. Bullhead down to kill well.
Monitor well and top off pits w/ production H2O. Nipple down Tree and Nipple up BOPs.
11/18/2013
Finish N/U BOPs. PSI test BOPs. IBOP test failed. C/O IBOP on top drive. Trip out of hole w/
4.5" tubing.
11/19/2013
Trip out of hole pumping down tubing to shear valve. Pump to clear tubing. Trip out of hole
filling hole @ 15 bbls/hr. Rig up Halliburton Slickline. Pull slip stop, pull pack off and pump. Rig
down Halliburton. Trip out of hole and lay down Pump
11/20/2013
Disconnect inter-connects, flow line, turn buckles and curtain. Level derrick, jack up rig,
reconnect inter-connects. Install/remove wear bushing in pipe strap and tally same. M/U
Scraper run BHA. Pick Up 4.5" DP t/ 3528'. Cut and slip. Grease top drive, blocks, crown, draw
works. Continue Pick Up drill pipe. Filling hole @ 10 bbls/hr.
11/21/2013
Trip in hole w/ scraper and drill pipe. Tag liner @ 11026' MD. Trip in hole. Lay down scraper
BHA. Pick up packer BHA. Packer damaged. Clean/service rig. New packer on location. Pick
up packer BHA. Trip in hole w/ 4.5" drill pipe.
11/22/2013
Trip in hole and set packer @ 10969' MD. Pull free of packer. Fill hole @ 4 bbls/min. Returns
after 30 bbls. Take returns to cuttings box. Circulate until clean returns. Tripped out of hole to
surface and laid down packer BHA.
Gas: There was a max trip gas of 662 units.
11/23/2013
Rig up Halliburton E-line. Run in hole with E-line t/ 10944' MD, Pulled out of hole. Laid down E-
line tools and service tractor and make up tractor. Start in hole, log from 10944' to 8060'.
Service rig, mud pumps while running Halliburton logging.
11/24/2013
Adjust centralizers on Halliburton logging tool. Run in hole with logging tools. Log from 10945-
8060' MD. Pulled out of hole and laid down logging tools. Picked up BHA, Tripped in hole,
retrieve packer. Monitor well, on vacuum and then tripped out of hole with packer.
11/25/2013
Tripped in hole with packer and set @ 10968'. Test packer, Rigg ed down testing equipment,
and begin to trip out of hole.
11/26/2013
Finish tripping out of hole. Tested BOPs and picked up milling BHA and begin to RIH. Shallow
hole tested MWD tools. Continue to run in hole. Slip & cut.
11/27/2013
Tripped in hole with whipstock and milling BHA. Set whipstock and begin to displace well to
FazePro OBM. Milled window per Baker rep, milling to 10944' MD.
11/28/2013
Tripped out of hole and laid down milling BHA. Picked up BHA #1 and run in hole while picking
up 5" Drill pipe singles.
11/29/2013
Run in hole with 5" DP singles, adding rollers, to bottom. Work through window and perform
Leak of test. Leak of test to 10.75ppg EMW. Drill ahead.
Gas: There was a max gas of 28 units from 11050’ MD with an average drilling gas of 19 units.
11/30/2013
Drill ahead in build section to 11229' MD. Back reamed and CBU per K&M rep. Tripped out of
hole and laid down BHA #1. Picked up BHA #2 and tripped out of hole.
Gas: The max gas of 541 units from 11194’ MD with an average drilling gas of 154 units.
12/01/2013
Tripped out of hole to 10777' MD. Then slipped and cut drill line. MAD Pass from 10902' to
11229' MD. Drill ahead.
Gas: The max gas of 821 units from 11703’ MD with an average drilling gas of 361 units
12/02/2013
Drilled ahead.
Gas: The max gas of 871 units from 13979’ MD with an average drilling gas of 464 units.
12/03/2013
Drilled ahead
Gas: The max gas of 813 units from 15882’ MD with an average drilling gas of 485 units.
12/04/2013
Drilled ahead.
Gas: The max gas of 872 units from 16869’ MD with an average drilling gas of 497 units
12/05/2013
Drilled ahead to TD of 19145' MD. BROOH per K&M.
Gas: The max gas of 915 units from 19127’ MD with an average drilling gas of 488 units
12/06/2013
BROOH per K&M to 8383' MD. Tripped out of hole.
Gas: There was a max trip gas of 26 units.
12/07/2013
Laid down BHA #2. Picked up and run in hole with whipstock retrieval assembly. Tripped in
hole and retrieve whipstock. Tripped out of hole. Then laid down Whipstock and retrieval
assembly.
12/08/2013
Rigged up for slotted liner run. Picked up and made up liner packer/hanger and run in hole.
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
20000
0 5 10 15
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
Days vs. Depth
16 November 2013
Sperry SDL Remain on Location
from Previous Well
WELL NAME: OP10-09L1
OPERATOR: ENI Petroleum
MUD CO: MI Swaco
RIG: Nabors 245
SPERRY JOB: AK-XX-0900831473
LOCATION: Oliktok Point
AREA: Nikaitchuq Field
STATE: Alaska
SPUD: 27 Nov 2013
TD: 05 Dec 2013
Commenced 8.75" Milling Window
Hole Section @ 10,903' MD
On Bot: 22:20 27 Nov 2013
Commenced 8.75" Production Build Section
from 10,944' MD to 11,229' MD
On Bot: 19:00 29 Nov 2013
Commenced 8.75" Production Section
On Bot: 09:40 01 Dec 2013
TD Production Hole Section
19,145' MD, 3,596.3' TVD
Off Bot: 11:40 05 Dec 2013
WELL NAME:LOCATION:Oliktok Point
OPERATOR:AREA:Nikaitchuq Field
SPERRY JOB:STATE:Alaska
RIG:Nabors 245 HOLE SECTION Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
ENI Petroleum
AK-XX-0900831473
Emil Opitz 7-Dec-2013
OP10-09L1
What went as, or better than, planned:
Two of our computers began powering down unexplicably. This happened mulitply time with minimal
data lost. Computers will be switched out at the end of the drilling run with new computers from town.
Recommendations:
Innovations and/or cost savings:
Our gas detection worked well with minimal data lost.
Difficulties experienced:
Continue to troubleshoot computer issue.
N/A
Surface Data Logging
After Action Review
WELL NAME:OP10-09L1 LOCATION:Oliktok Point
OPERATOR:ENI Petroleum AREA:Nikaitchuq Field
MUD CO:MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:27-Nov-2013
SPERRY JOB:AK-XX-0900918317 TD:5-Dec-2013
Marker MD INC AZ TVD TVDSS
Top of window 10903.00 83.97 316.61 3668.05 -3614.55
Bottom of window 10920.00 84.20 316.31 3669.80 -3616.30
OA-Sand Top 11160.00 85.69 310.01 3692.11 -3638.61
OA-2 11268.00 87.43 310.66 3699.12 -3645.62
OA-2 11376.00 91.64 309.88 3699.75 -3646.25
OA-2 12808.00 89.76 308.09 3694.75 -3641.25
OA-3 12955.00 87.51 304.86 3698.69 -3645.19
OA-3 14107.00 93.11 303.49 3688.23 -3634.73
OA-2 14249.00 91.80 304.57 3681.79 -3628.29
OA-Sand Top 15368.00 87.94 300.88 3654.25 -3600.75
Fault 1 15407.00 87.65 299.86 3655.73 -3602.23
OA-2 15453.00 86.96 299.00 3657.90 -3604.40
OA-3 15543.00 86.05 298.19 3663.55 -3610.05
OA-3 16383.00 93.18 294.71 3655.87 -3602.37
OA-2 16498.00 92.54 294.44 3650.01 -3596.51
Fault 2 17099.00 93.41 293.40 3635.07 -3581.57
OA-3 17190.00 92.60 293.77 3629.85 -3576.35
OA-2 17382.00 92.43 294.90 3622.85 -3569.35
OA-2 18048.00 88.12 291.18 3607.27 -3553.77
OA-3 18145.00 88.49 288.77 3610.51 -3557.01
TD 8 3/4" Borehole 19145.00 90.53 289.09 3596.51 -3543.01
Formation Tops
8 3/4" Borehole
OP10-09L1 Oliktok Point
ENI Petroleum Nikaitchuq Field
MI Swaco Alaska
Nabors 245 27-Nov-2013
AK-XX-0900918317 5-Dec-2013
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/R
6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime CaCl2 Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb ppb
27-Nov 10927 8.65 49 14 21 9/9/9 4.8 49/35/28/21/8/7 -/1 9.12 69/31 1.55 2.02 25500 Pumping Sweep
28-Nov 10944 8.65 48 13 16 8/8/8 4.4 42/29/24/19/8/6 -/1 7.04 70/30 1.35 1.76 27500 Tripping in hole
29-Nov 11009 8.75 51 14 14 9/9/9 5.6 52/34/29/21/9/8 -/1 7.68 69/31 1.75 2.28 31500 Drilling ahead
30-Nov 11229 8.70 53 15 23 10/10/10 5.2 53/38/30/24/9/8 -/1 7.0 68/32 1.90 2.47 32000 Tripping in hole
1-Dec 12301 8.7 48 13 18 7/8/8 5.8 44/31/26/20/8/7 -/1 7.93 71/29 1.9 2.47 30000 Drilling ahead
2-Dec 14421 8.75 46 12 14 6/6/6 4.8 38/26/21/15/6/5 -/1 9.08 73/27 2 2.6 29000 Drilling ahead
3-Dec 16087 8.75 46 13 20 7/7/7 5.4 46/33/27/20/8/7 -/1 9.86 73/27 2.2 2.86 35500 Drilling ahead
4-Dec 18051 8.75 45 13 16 7/7/7 5.6 42/29/24/18/8/7 -/1 9.68 73/27 1.95 2.54 35500 Drilling ahead
5-Dec 19145 8.7 46 12 18 7/7/7 6.2 42/30/25/18/8/7 -/1 9.82 73/27 2.45 3.19 36500 Backreaming out
6-Dec 19145 8.7 46 12 18 7/7/7 5.8 42/30/24/17/8/7 -/1 11 73/27 2.35 3.06 36500 Tripping out of hole
7-Dec 19145 8.7 46 11 18 7/7/7 5.9 40/29/24/16/8/7 -/1 11 73/27 2.15 2.8 37000 Changing BHA
8-Dec 19145 8.7 47 12 17 7/7/7 5.8 41/29/24/17/8/7 -/1 11 73/27 2.05 2.67 36500 Running liner
Casing Record
9.625" Casing @ 10903' MD, 3668'TVD
WELL NAME:LOCATION:
OPERATOR:AREA:
MUD CO:STATE:
RIG:SPUD:
SPERRY JOB:TD:
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
1 300 1 Smith Milled Tooth XR+8.75 10944 11229 285 4.90 0.746 58.6 10 40 1500 450 1-2-WT-A-E-I-NO-BHA Mud motor BHA - build section
2 400 2 Hycalog SKH616M-E1D PDC 8.75 11229 19145 7916 58.00 0.902 137.7 6 120 2200 450 1-2-BT-N-X-I-NO-TD Production Section TD
WELL NAME:OP10-09L1 LOCATION:Oliktok Point
OPERATOR:ENI Petroleum AREA:Nikaitchuq Field
MUD CO:
SPERRY JOB:AK-XX-0900918317 TD:5-Dec-2013
MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:27-Nov-2013
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:Move rig to OP10-09L1.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
0
16-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #Size
11238'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
Moving Rig
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / C. Sinn
Set AtSize
40 #L-80
Grade
9 5/8"
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / C. Sinn
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
C-5n C-2
in
Minimum
Depth
Time:
Monitor well and top off pits w/ production H2O. N/D Tree. N/U BOPs.
-
-
-
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-09xxxxxx
N/U BOPs
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
Production H2O
Depth in / out
Mud Type
Lst
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
100% Gas In Air =10,000 Units Connection
0
No gas.
11238'
Condition Bit #
8.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
17-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
20000.00
Complete Rig Up over OP10-09L1. Transfer production H2O into pits. Bullhead down to kill well.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / C. Sinn
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
C-5n C-2
in
Minimum
Depth
Time:
-
-
-
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-09xxxxxx
Pulling Tubing
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
Production H2O
Depth in / out
Mud Type
Lst
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
100% Gas In Air =10,000 Units Connection
0
No gas.
11238'
Condition Bit #
8.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
18-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
20000.00
Finish N/U BOPs. PSI test BOPs. IBOP test failed. C/O IBOP on top drive. TOOH w/ 4.5" tubing.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / C. Sinn
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
28
C-5n C-2
in
Minimum
Depth
Time:
R/U Halliburton Slickline. Pull slip stop, pull pack off and pump. R/D Halliburton. TOOH and L/D Pump
-
-
-
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-09xxxxxx
L/D Pump
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
Production H2O
Depth in / out
Mud Type
Lst
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
100% Gas In Air =10,000 Units Connection
0
11238'
Condition Bit #
8.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
19-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
19000.00
TOOH. Pump down tubing to shear valve. Pump to clear tubing. TOOH. Fill hole @ 15 bbls/hr.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: Disconnect inter-connects, flow line, turn buckles and curtain. Level derrick, jack up rig, reconnect inter-connects.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
19000.00
0
20-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Condition Bit #
8.50
Size
No Gas.
Grease top drive, blocks, crown, draw works. Continue P/U drill pipe. Filling hole @ 10 bbls/hr.
11238'
100% Gas In Air =10,000 Units Connection
0
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Background
(max)
Trip
Average
Mud Type
Lst
Type
Production H2O
Depth in / out
YP
(lb/100ft 2)
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-09xxxxxx
L/D Pump
PV
Footage
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
Install/remove wear bushing in pipe strap and tally same. M/U Scraper run BHA. P/U 4.5" DP t/ 3528'. Cut and slip.
in
Minimum
Depth C-5n C-2
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
28
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / C. Sinn
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / C. Sinn
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
C-5n C-2
in
Minimum
Depth
Time:
Packer damaged. Clean/service rig. New packer on location. P/U packer BHA. TIH w/ 4.5" drill pipe.
-
-
-
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
TIH w/ Packer
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
Production H2O
Depth in / out
Mud Type
Lst
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
100% Gas In Air =10,000 Units Connection
0
No Gas.
11238'
Condition Bit #
8.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
21-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
19000.00
TIH w/ scraper and drill pipe. Tag liner @ 11026' MD. TIH. L/D scraper BHA. P/U packer BHA.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: TIH, set packer @ 10969' MD. Pull free of packer. Fill hole @ 4 bbls/min. Returns after 30 bbls. Take returns
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
18000.00
0
22-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Condition Bit #
8.50
Size
662 units of max trip gas.
11238'
100% Gas In Air =10,000 Units Connection
0
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Background
(max)
Trip
Average
662
Mud Type
Lst
Type
Production H2O
Depth in / out
YP
(lb/100ft 2)
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
L/D Packer BHA
PV
Footage
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
to cuttings box. Circulate until clean returns. TOOH t/ surface. L/D packer BHA.
in
Minimum
Depth C-5n C-2
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
C-5n C-2
in
Minimum
Depth
Time:
start in hole, log f/ 10944' t/ 8060'. Service rig, mud pumps while running Halliburton logging.
-
-
-
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
Service Rig
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
Production H2O
Depth in / out
Mud Type
Lst
Type
Average
0Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
100% Gas In Air =10,000 Units Connection
0
No Trip Gas.
11238'
Condition Bit #
8.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
23-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
19000.00
R/U Halliburton E-line. RIH w/ E-line t/ 10944' MD, POOH. L/D E-line tools and service tractor. M/U tractor
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
28
C-5n C-2
in
Minimum
Depth
Time:
L/D logging tools. P/U BHA, TIH, retrieve packer. Monitor well, on vacuum. TOOH w/ packer.
-
-
-
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
TOOH w/ Packer
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
Production H2O
Depth in / out
Mud Type
Lst
Type
Average
0Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
100% Gas In Air =10,000 Units Connection
0
No Trip Gas.
11238'
Condition Bit #
8.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
24-Nov-2013
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
18000.00
Adjust centralizers on Halliburton logging tool. RIH w/ logging tools. Log f/ 10945-8060' MD. POOH.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: TIH w/ packer and set @ 10968'. Test packer, R/D testing equipment, and begin to TOOH.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
19000
0
25-Nov-2013
24:00
Current Pump & Flow Data:
Max
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Condition Bit #
8.50
Size
No Trip Gas.
11238'
100% Gas In Air =10,000 Units Connection
0
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Background
(max)
Trip
Average
0
Mud Type
Lst
Type
Production H2O
Depth in / out
YP
(lb/100ft 2)
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
TOOH
PV
Footage
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5n C-2
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
C-5n C-2
in
Minimum
Depth
Time:
-
-
-
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Sherman
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
RIH with milling BHA
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
Production H2O
Depth in / out
Mud Type
Lst
Type
Average
0Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
100% Gas In Air =10,000 Units Connection
0
No Trip Gas.
11238'
Condition Bit #
8.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
26-Nov-2013
24:00
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
19000
Finish TOOH. Test BOPs. P/U milling BHA and begin to RIH. Shallow test MWD tools. Continue to RIH. Slip & cut.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: TIH with whipstock/milling BHA. Set whipstock and begin to displace well to FazePro OBM. Mill window per Baker
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
25500
0
27-Nov-2013
24:00
Current Pump & Flow Data:
2090
Max
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Condition Bit #
9.1 8.65
Size
No Trip Gas.
11238'
100% Gas In Air =10,000 Units Connection
0
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background
(max)
Trip
Average
0
Mud Type
Lst
Type
FazePro 4.8 10927'21
Depth in / out
YP
(lb/100ft 2)
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
Mill window
PV
Footage
Perry / Sherman
Sh Clyst Tuff Gvl Coal
cP
14
Gas Summary
0
0 0
(current)
Avg
to 10903'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
30.4 Flow In (gpm)
Flow In (spm)
10903'
10944'
41'
Max @ ft Current
10936'12.3
Date:
Time:
rep, milling to 10944' MD.
in
Minimum
Depth C-5n C-2
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
49
MBT
10944'
pH
0
0
0
Siltst
509
119
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
10944'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
48
C-5n C-2
in
Minimum
Depth
Time:
10944'
10944'
0'
Max @ ft Current
Date:
Avg
to 10944'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Sherman
Sh Clyst Tuff Gvl Coal
cP
13
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900918317
P/U 5" DP
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
FazePro 4.4 10944'16
Depth in / out
Mud Type
Lst
Type
Average
00Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Hydril 563
100% Gas In Air =10,000 Units Connection
0
No Trip Gas.
11238'
Condition Bit #
7.0 8.65
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
28-Nov-2013
24:00
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
27500
TOOH and L/D milling BHA. P/U BHA #1 and RIH, while P/U 5" DP singles.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: RIH with 5" DP singles, adding rollers, to bottom. Work through window and perform LOT. LOT to 10.75ppg EMW.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
31500
0
29-Nov-2013
24:00
Current Pump & Flow Data:
2161
Max
Intermediate - TOL @ 10759'
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Condition Bit #
1
7.9
8.75
8.70
Smith XR+
8.75
Size
11238'
100% Gas In Air =10,000 Units -Connection
0
Tools
1.83* XP Motor, TeleScope 675
API FL
Chromatograph (ppm)
10944'
WOB
Hydril 563
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
4Background
(max)
Trip
Average
-
Mud Type
Lst
Type
FazePro 5.6 11009'16
Depth in / out
YP
(lb/100ft 2)
69/31
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
1
Hours
C-3
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
Drilling ahead
PV
Footage
Perry / Sherman
Sh Clyst Tuff Gvl Coal
cP
18
Gas Summary
0
0 0
(current)
Avg
to 10944'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
117.6 Flow In (gpm)
Flow In (spm)
10944'
11102'
158'
Max @ ft Current
11069'62.7
Date:
Time:
Drill ahead.
10
in
2 10981'Minimum
Depth C-5n
11050'
90.0
C-2
28
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
1.75 51
Alkal Mud
11102'
Oil/Water
0.746
0
0
0
Siltst
480
112
Units*
Casing
Summary
Lithology (%)
01371
479
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
10
0
Cly
3818
.
.
*
24 hr Recap:
(max) (current)
341
0
Cly
65415
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
15
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
16666
1671
Units*
Casing
Summary
Lithology (%)
19
Alkal Mud
11229'
Oil/Water
0.746
0
69
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
1.90 53
C-5n
11194'
C-2
541
in
11 11107'Minimum
Depth
Time:
and TIH.
154
11102'
11229'
127'
Max @ ft Current
11127'82.8
Date:
Avg
to 11102'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
135.7 Flow In (gpm)
Flow In (spm)
Gas Summary
0
62 30
(current)
Perry / Sherman
Sh Clyst Tuff Gvl Coal
cP
15
285'
8.75 0.902
Footage
4.90
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
TIH w/ BHA #2
PV
24 hr Max
Weight
90
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
68/32
318 7
40.0
Hycalog SKY616M-E1D
FazePro 5.2
11129'
11229'23
Depth in / out
Mud Type
Lst
Type
Average
86 -Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
1.83* XP Motor, TeleScope 675
API FL
Chromatograph (ppm)
10.0 10944' 11129'
WOB
Hydril 563
100% Gas In Air =10,000 Units -Connection
124
2
11238'
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
7.0
8.75 Smith XR+
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
30-Nov-2013
24:00
Current Pump & Flow Data:
Max
32
Chlorides
mg/l
32000
Drill ahead in build section to 11229' MD. Backream and CBU per K&M rep. TOOH and L/D BHA #1. P/U BHA #2
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: TIH to 10777' MD. Slip and cut. MAD Pass from 10902' to 11229' MD. Drill ahead.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
30000
148
1-Dec-2013
24:00
Current Pump & Flow Data:
2412
Max
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.51
Nabors 245E Report For:
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
7.9
8.75
8.70
Smith XR+
8.70
Size
2
11238'
100% Gas In Air =10,000 Units -Connection
225
Tools
Xceed 675; PeriScope 675; TeleScope 675; Neoscope
API FL
Chromatograph (ppm)
10.0 10944' 11129'
WOB
Hydril 563
10.02 10.27
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
90 Background
(max)
Trip
Average
21
Mud Type
Lst
Type
40.0
Hycalog SKY616M-E1D
FazePro 5.8
11129'
12301'18
Depth in / out
YP
(lb/100ft 2)
71/29
27 99 52
014
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
315
Hours
C-3
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
Drilling Ahead
PV
285'
8.75 0.902
Footage
4.90
Perry / Sherman
Sh Clyst Tuff Gvl Coal
cP
13
Gas Summary
8
127 61
(current)
Avg
to 11229'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
296.9 Flow In (gpm)
Flow In (spm)
11229'
12615'
1386'
Max @ ft Current
11646'190.3
Date:
Time:
361
in
54 11472'Minimum
Depth C-5n
11703'
159.0
C-2
821
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
1.90 48
Alkal Mud
12615'
Oil/Water
0.746
18
133
13
Siltst
498
118
Units*
Casing
Summary
Lithology (%)
99 49111
6468
907-685-1490 Unit Phone:
32
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
552
41
Cly
95797
.
.
*
24 hr Recap:
(max) (current)
590
57
Cly
97413
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
78
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
46904
4209
497
118
Units*
Casing
Summary
Lithology (%)
148
Alkal Mud
14704'
Oil/Water
0.746
59
220
73
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
2.00 46
C-5n
13979'
149.6
C-2
871
in
61 14422'Minimum
Depth
Time:
464
12615'
14704'
2089'
Max @ ft Current
14130'181.4
Date:
Avg
to 12615'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
277.9 Flow In (gpm)
Flow In (spm)
Gas Summary
76
234 143
(current)
Perry / Sherman
Sh Clyst Tuff Gvl Coal
cP
12
285'
8.75 0.902
Footage
4.90
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
Drilling Ahead
PV
24 hr Max
Weight
325
Hours
C-3
45 91
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
73/27
57 162 104
40.0
Hycalog SKY616M-E1D
FazePro 4.8
11129'
14421'14
Depth in / out
Mud Type
Lst
Type
Average
-65 Background
(max)
Trip
9.92 10.27
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Xceed 675; PeriScope 675; TeleScope 675; Neoscope
API FL
Chromatograph (ppm)
10.0 10944' 11129'
WOB
Hydril 563
100% Gas In Air =10,000 Units -Connection
300
2
11238'
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
9.1
8.75
8.80
Smith XR+
8.75
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.51
Nabors 245E Report For:
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
2-Dec-2013
24:00
Current Pump & Flow Data:
2597
Max
184
Chlorides
mg/l
29000
Drilling ahead.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: Drilling ahead.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
35500
179
3-Dec-2013
24:00
Current Pump & Flow Data:
2839
Max
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.92
Nabors 245E Report For:
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
9.9
8.75
8.75
Smith XR+
8.75
Size
2
11238'
100% Gas In Air =10,000 Units -Connection
320
Tools
Xceed 675; PeriScope 675; TeleScope 675; Neoscope
API FL
Chromatograph (ppm)
10.0 10944' 11129'
WOB
Hydril 563
10.28 10.57
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
28 Background
(max)
Trip
Average
-
Mud Type
Lst
Type
40.0
Hycalog SKY616M-E1D
FazePro 5.4
11129'
16087'20
Depth in / out
YP
(lb/100ft 2)
73/27
59 153 103
41 75
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
315
Hours
C-3
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
Drilling Ahead
PV
285'
8.75 0.902
Footage
4.90
Perry / Sherman
Sh Clyst Tuff Gvl Coal
cP
13
Gas Summary
66
238 145
(current)
Avg
to 14704'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
271.9 Flow In (gpm)
Flow In (spm)
14704'
16331'
1627'
Max @ ft Current
15977'165.3
Date:
Time:
485
in
43 16049'Minimum
Depth C-5n
15882'
44.2
C-2
813
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
2.20 46
Alkal Mud
16331'
Oil/Water
0.746
51
224
64
Siltst
506
119
Units*
Casing
Summary
Lithology (%)
140 47353
2479
907-685-1490 Unit Phone:
81
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
596
39
Cly
89121
.
.
*
24 hr Recap:
(max) (current)
713
87
Cly
94067
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
81
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
47527
6099
499
118
Units*
Casing
Summary
Lithology (%)
168
Alkal Mud
18255'
Oil/Water
0.746
82
240
80
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
1.95 45
C-5n
16869'
139.6
C-2
872
in
74 17482'Minimum
Depth
Time:
497
16331'
18255'
1924'
Max @ ft Current
18061'182.2
Date:
Avg
to 16331'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
261.0 Flow In (gpm)
Flow In (spm)
Gas Summary
69
244 143
(current)
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
13
285'
8.75 0.902
Footage
4.90
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
Drilling Ahead
PV
24 hr Max
Weight
411
Hours
C-3
43 89
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
73/27
63 178 109
40.0
Hycalog SKY616M-E1D
FazePro 5.6
11129'
18051'16
Depth in / out
Mud Type
Lst
Type
Average
-113 Background
(max)
Trip
10.53 10.98
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Xceed 675; PeriScope 675; TeleScope 675; Neoscope
API FL
Chromatograph (ppm)
10.0 10944' 11129'
WOB
Hydril 563
100% Gas In Air =10,000 Units -Connection
378
2
11238'
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
9.7
8.75
8.75
Smith XR+
8.75
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.69
Nabors 245E Report For:
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
4-Dec-2013
24:00
Current Pump & Flow Data:
2954
Max
261
Chlorides
mg/l
35500
Drilling ahead.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: Drilled ahead to TD of 19145' MD. BROOH per K&M.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
36500
342
5-Dec-2013
24:00
Current Pump & Flow Data:
2681
Max
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.16
Nabors 245E Report For:
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
9.8
8.75
8.75
Smith XR+
8.70
Size
2
11238'
100% Gas In Air =10,000 Units -Connection
663
Tools
Xceed 675; PeriScope 675; TeleScope 675; Neoscope
API FL
Chromatograph (ppm)
10.0 10944' 11129'
WOB
Hydril 563
10.70 10.98
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
23 Background
(max)
Trip
Average
99
Mud Type
Lst
Type
40.0
Hycalog SKY616M-E1D
FazePro 6.2
11129'
19145'18
Depth in / out
YP
(lb/100ft 2)
73/27
71 207 120
46 99
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
455
Hours
C-3
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
BROOH
PV
285'
8.75 0.902
Footage
4.90
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
12
Gas Summary
74
343 173
(current)
Avg
to 18255'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
263.2 Flow In (gpm)
Flow In (spm)
18255'
19145'
890'
Max @ ft Current
19124'163.9
Date:
Time:
488
in
71 18369'Minimum
Depth C-5n
19127'
C-2
915
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
2.45 46
Alkal Mud
19145'
Oil/Water
0.746
100
306
81
Siltst
496
117
Units*
Casing
Summary
Lithology (%)
186 47366
5089
907-685-1490 Unit Phone:
100
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
893
84
Cly
95778
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
Alkal Mud
19145'
Oil/Water
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
2.35 46
C-5n C-2
in
Minimum
Depth
Time:
19145'
19145'
0'
Max @ ft Current
Date:
Avg
to 19145'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
12
285'
8.75 0.902
Footage
4.90
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
L/D BHA #2
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
73/27
000
40.0
Hycalog SKY616M-E1D
FazePro 5.8
11129'
19145'18
Depth in / out
Mud Type
Lst
Type
Average
26 -Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Xceed 675; PeriScope 675; TeleScope 675; Neoscope
API FL
Chromatograph (ppm)
10.0 10944' 11129'
WOB
Hydril 563
100% Gas In Air =10,000 Units -Connection
0
2
11238'
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
9.6
8.75 Smith XR+
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
6-Dec-2013
24:00
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
36500
BROOH per K&M to 8383' MD. TOOH.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
Alkal Mud
19145'
Oil/Water
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
2.15 46
C-5n C-2
in
Minimum
Depth
Time:
retrieval assemtly..
19145'
19145'
0'
Max @ ft Current
Date:
Avg
to 19145'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
11
285'
8.75 0.902
Footage
58.00 7916'
4.90
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
R/U Slotted Liner
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
73/27
000
120
40.0
Hycalog SKY616M-E1D
FazePro 5.9
11129'
19145'18
19145'
Depth in / out
Mud Type
Lst
Type
Average
--Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
6
10.0 10944' 11129'
WOB
Hydril 563
100% Gas In Air =10,000 Units -Connection
0
2
11238'
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
9.6
8.75 Smith XR+
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
1-2-BT-N-X-I-NO-TD
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
7-Dec-2013
24:00
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
37000
L/D BHA #2. P/U and RIH w/ whipstock retrieval assembly. TIH. Retrieve whipstock and TOOH. L/D Whipstock and
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: R/U for slotted liner run. P/U and M/U liner packer/hanger and RIH.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
36500
0
8-Dec-2013
24:00
Current Pump & Flow Data:
Max
1-2-BT-N-X-I-NO-TD
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
9.6
8.75 Smith XR+
8.70
Size
2
11238'
100% Gas In Air =10,000 Units -Connection
0
Tools
API FL
Chromatograph (ppm)
6
10.0 10944' 11129'
WOB
Hydril 563
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
-Background
(max)
Trip
Average
-
Mud Type
Lst
Type
120
40.0
Hycalog SKY616M-E1D
FazePro 5.8
11129'
19145'17
19145'
Depth in / out
YP
(lb/100ft 2)
73/27
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
RIH w/ Slotted Liner
PV
285'
8.75 0.902
Footage
58.00 7916'
4.90
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
12
Gas Summary
0
0 0
(current)
Avg
to 19145'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
19145'
19145'
0'
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5n C-2
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
2.05 47
Alkal Mud
19145'
Oil/Water
0.746
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40 # L-80
Grade
9 5/8"
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
Alkal Mud
19145'
Oil/Water
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
2.05 46
C-5n C-2
in
Minimum
Depth
Time:
19145'
19145'
0'
Max @ ft Current
Date:
Avg
to 19145'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
11
285'
8.75 0.902
Footage
58.00 7916'
4.90
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
L/D DP
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
73/27
000
120
40.0
Hycalog SKY616M-E1D
FazePro 5.9
11129'
19145'19
19145'
Depth in / out
Mud Type
Lst
Type
Average
--Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
6
10.0 10944' 11129'
WOB
Hydril 563
100% Gas In Air =10,000 Units -Connection
0
2
11238'
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1
11.0
8.75 Smith XR+
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
1-2-BT-N-X-I-NO-TD
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
9-Dec-2013
24:00
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
36500
Finish RIH with slotted liner to bottom. Begin to L/D drill pipe.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: Displace well to brine. L/D 4.5" DP. Begin BOP testing.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
38500
0
10-Dec-2013
24:00
Current Pump & Flow Data:
Max
1-2-BT-N-X-I-NO-TD
TOW 10903' - BOW 10920' MD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
OP10-09L1
Eni Petroleum
Nikaitchuq
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Condition
1-2-WT-A-E-I-NO-BHA
Bit #
1 8.75 Smith XR+
8.70
Size
2
11238'
100% Gas In Air =10,000 Units -Connection
0
Tools
API FL
Chromatograph (ppm)
6
10.0 10944' 11129'
WOB
Hydril 563
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
-Background
(max)
Trip
Average
-
Mud Type
Lst
Type
120
40.0
Hycalog SKY616M-E1D
Brine
11129'
19145'
19145'
Depth in / out
YP
(lb/100ft 2)
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(Pom)
C-1 C-5i
AK-AM-0900918317
Test BOPs
PV
285'
8.75 0.902
Footage
58.00 7916'
4.90
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
Gas Summary
0
0 0
(current)
Avg
to 19145'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
19145'
19145'
0'
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5n C-2
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
28
Alkal Mud
19145'
Oil/Water
0.746
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Emil Opitz
Maximum
Report By: Logging Engineers: E. Opitz / D. Acker
Set At Size
40 # L-80
Grade
9 5/8"
(max) (current)
0
0
Cly
0
WELL INFORMATION Created On : Jan 03 2014
Customer :Eni Petroleum
Well Name :OP10-09L1
Job Number :AK-XX-0900918317
Rig Name :Nabors 245E
Field Name :Nikaitchuq
Country :USA
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00
168.38 0.37 125.76 168.38 0.32 S 0.44 E -0.54 0.22
259.84 1.19 14.76 259.83 0.43 N 0.92 E -0.56 1.49
259.86 1.19 14.76 259.85 0.43 N 0.92 E -0.56 1.71
297.16 1.80 7.22 297.14 1.38 N 1.10 E -0.21 1.71
297.18 1.80 7.22 297.16 1.38 N 1.10 E -0.21 1.69
327.80 2.29 2.42 327.76 2.47 N 1.18 E 0.28 1.69
357.85 2.63 356.91 357.78 3.76 N 1.17 E 0.96 1.38
388.34 3.17 353.03 388.23 5.30 N 1.03 E 1.88 1.88
418.71 3.44 359.57 418.55 7.04 N 0.92 E 2.88 1.53
448.53 3.76 354.23 448.31 8.91 N 0.82 E 3.95 1.55
478.85 4.16 352.58 478.56 10.99 N 0.57 E 5.24 1.37
509.89 5.29 347.62 509.50 13.50 N 0.12 E 6.93 3.87
541.07 6.24 346.71 540.52 16.56 N 0.58 W 9.12 3.06
572.47 7.43 345.37 571.69 20.18 N 1.48 W 11.78 3.82
602.79 8.89 340.16 601.71 24.28 N 2.77 W 15.02 5.39
634.03 10.10 340.15 632.52 29.13 N 4.52 W 19.04 3.87
730.40 12.76 344.43 726.97 47.33 N 10.25 W 33.41 2.90
825.98 13.59 345.13 820.03 68.35 N 15.96 W 49.24 0.88
921.11 15.97 349.65 912.01 92.03 N 21.18 W 66.03 2.78
1016.85 17.39 350.91 1,003.72 119.12 N 25.81 W 84.09 1.53
1079.10 18.77 352.63 1,062.90 138.24 N 28.56 W 96.41 2.38
1175.59 22.01 351.93 1,153.33 171.55 N 33.10 W 117.63 3.37
1240.42 24.70 349.95 1,212.84 196.92 N 37.17 W 134.32 4.32
1270.73 25.96 349.06 1,240.24 209.66 N 39.53 W 142.98 4.34
1366.11 29.65 347.27 1,324.59 253.19 N 48.69 W 173.48 3.97
1461.33 32.53 345.56 1,406.13 300.97 N 60.27 W 208.25 3.16
1558.29 32.21 345.05 1,488.02 351.18 N 73.44 W 245.65 0.43
1653.45 32.88 344.44 1,568.24 400.57 N 86.91 W 282.88 0.78
1748.12 33.51 344.65 1,647.46 450.52 N 100.72 W 320.70 0.68
1845.90 33.65 345.50 1,728.92 502.78 N 114.65 W 359.81 0.50
INSITE V8.0.0 Page 1Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1941.93 37.42 345.50 1,807.05 556.81 N 128.62 W 399.89 3.93
2036.21 40.34 343.82 1,880.44 613.86 N 144.30 W 442.99 3.29
2132.86 42.74 342.86 1,952.78 675.25 N 162.69 W 490.67 2.57
2227.77 46.76 341.50 2,020.17 738.84 N 183.16 W 541.27 4.35
2324.34 49.73 338.45 2,084.48 806.49 N 207.86 W 597.60 3.87
2404.15 51.66 335.67 2,135.04 863.34 N 231.94 W 647.78 3.62
2514.09 53.67 335.60 2,201.71 942.96 N 268.00 W 720.05 1.83
2546.10 54.34 335.65 2,220.53 966.55 N 278.69 W 741.46 2.10
2609.39 56.23 333.69 2,256.57 1,013.56 N 300.96 W 784.96 3.92
2705.66 59.77 331.12 2,307.58 1,085.88 N 338.79 W 854.93 4.32
2801.55 62.76 328.40 2,353.68 1,158.49 N 381.15 W 928.92 3.99
2897.71 66.14 326.09 2,395.16 1,231.42 N 428.10 W 1006.99 4.13
2992.15 68.62 325.38 2,431.48 1,303.45 N 477.18 W 1086.41 2.72
3089.29 71.66 324.29 2,464.47 1,378.13 N 529.80 W 1170.23 3.30
3184.76 75.95 324.06 2,491.10 1,452.45 N 583.45 W 1254.74 4.50
3282.04 79.37 322.99 2,511.88 1,528.85 N 639.94 W 1342.77 3.68
3377.50 81.28 323.15 2,527.93 1,604.07 N 696.48 W 1430.21 2.01
3472.50 81.56 322.87 2,542.10 1,679.10 N 753.00 W 1517.55 0.41
3568.20 81.31 322.86 2,556.35 1,754.54 N 810.13 W 1605.62 0.26
3665.39 81.28 321.76 2,571.06 1,830.56 N 868.86 W 1695.36 1.12
3759.45 81.03 323.31 2,585.53 1,904.33 N 925.40 W 1782.05 1.65
3855.50 81.21 323.39 2,600.35 1,980.47 N 982.04 W 1870.07 0.20
3949.83 81.50 324.26 2,614.53 2,055.74 N 1,037.09 W 1956.27 0.96
4045.08 80.66 323.57 2,629.30 2,131.79 N 1,092.51 W 2043.20 1.14
4141.87 80.07 322.74 2,645.50 2,208.15 N 1,149.73 W 2131.82 1.04
4237.62 80.52 322.84 2,661.64 2,283.32 N 1,206.81 W 2219.70 0.48
4333.94 81.23 322.17 2,676.92 2,358.77 N 1,264.69 W 2308.42 1.01
4429.46 80.93 323.13 2,691.73 2,433.78 N 1,321.94 W 2396.37 1.04
4525.15 80.85 323.51 2,706.88 2,509.56 N 1,378.38 W 2484.02 0.40
4621.16 80.97 324.08 2,722.05 2,586.06 N 1,434.38 W 2571.67 0.60
4715.79 80.97 324.73 2,736.90 2,662.05 N 1,488.78 W 2657.70 0.68
4811.87 80.63 325.06 2,752.26 2,739.64 N 1,543.32 W 2744.68 0.49
4908.23 80.83 324.31 2,767.78 2,817.24 N 1,598.29 W 2832.03 0.80
5004.20 80.73 323.53 2,783.16 2,893.80 N 1,654.08 W 2919.54 0.81
5098.88 80.66 323.03 2,798.47 2,968.70 N 1,709.95 W 3006.24 0.53
5195.58 80.69 323.44 2,814.14 3,045.14 N 1,767.06 W 3094.82 0.42
5291.55 80.78 323.24 2,829.59 3,121.12 N 1,823.61 W 3182.68 0.23
5386.54 80.77 323.08 2,844.82 3,196.16 N 1,879.83 W 3269.76 0.17
5482.82 80.74 323.03 2,860.29 3,272.11 N 1,936.95 W 3358.08 0.06
5578.93 80.88 323.11 2,875.64 3,347.95 N 1,993.95 W 3446.25 0.17
5674.50 80.68 323.02 2,890.95 3,423.35 N 2,050.64 W 3533.92 0.23
5770.14 80.71 322.95 2,906.41 3,498.71 N 2,107.46 W 3621.69 0.08
5866.30 80.59 322.40 2,922.03 3,574.16 N 2,164.99 W 3710.10 0.58
5961.83 80.83 321.78 2,937.46 3,648.55 N 2,222.92 W 3798.30 0.69
6057.70 80.95 321.45 2,952.64 3,722.75 N 2,281.69 W 3887.13 0.36
INSITE V8.0.0 Page 2Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
6152.64 80.85 321.08 2,967.65 3,795.87 N 2,340.35 W 3975.29 0.40
6249.20 81.23 320.33 2,982.69 3,869.69 N 2,400.76 W 4065.31 0.86
6343.47 79.93 320.21 2,998.12 3,941.21 N 2,460.20 W 4153.31 1.38
6440.35 81.20 320.43 3,014.00 4,014.76 N 2,521.22 W 4243.71 1.33
6536.21 81.51 321.35 3,028.41 4,088.29 N 2,581.00 W 4333.05 1.00
6628.19 81.13 321.50 3,042.29 4,159.38 N 2,637.70 W 4418.48 0.44
6726.52 80.67 320.88 3,057.84 4,235.04 N 2,698.55 W 4509.84 0.78
6821.76 80.56 320.90 3,073.37 4,307.95 N 2,757.82 W 4598.42 0.12
6917.67 80.99 321.32 3,088.75 4,381.63 N 2,817.26 W 4687.54 0.62
7014.43 80.19 321.74 3,104.57 4,456.37 N 2,876.64 W 4777.17 0.93
7110.15 80.47 321.82 3,120.65 4,530.50 N 2,935.02 W 4865.62 0.30
7206.52 80.42 323.12 3,136.64 4,605.86 N 2,992.91 W 4954.30 1.33
7301.26 80.23 324.21 3,152.57 4,681.10 N 3,048.25 W 5040.73 1.15
7396.90 80.26 324.07 3,168.77 4,757.49 N 3,103.46 W 5127.66 0.15
7492.92 80.46 325.22 3,184.85 4,834.69 N 3,158.24 W 5214.64 1.20
7589.16 80.34 325.95 3,200.90 4,912.97 N 3,211.87 W 5301.20 0.76
7683.58 80.62 326.41 3,216.52 4,990.34 N 3,263.70 W 5385.75 0.56
7754.47 80.99 326.38 3,227.85 5,048.62 N 3,302.43 W 5449.17 0.52
7779.10 81.26 325.32 3,231.65 5,068.76 N 3,316.09 W 5471.32 4.39
7874.18 81.68 325.14 3,245.75 5,146.00 N 3,369.71 W 5557.33 0.48
7975.31 81.70 325.39 3,260.37 5,228.23 N 3,426.73 W 5648.85 0.25
8066.10 81.26 326.74 3,273.82 5,302.73 N 3,476.85 W 5730.44 1.55
8162.70 81.50 325.92 3,288.30 5,382.21 N 3,529.80 W 5817.05 0.88
8257.55 81.83 324.74 3,302.05 5,459.40 N 3,583.19 W 5902.83 1.28
8353.13 81.82 323.52 3,315.64 5,536.06 N 3,638.62 W 5990.09 1.26
8449.19 81.77 322.78 3,329.35 5,612.14 N 3,695.64 W 6078.40 0.76
8544.85 81.71 322.25 3,343.09 5,687.26 N 3,753.25 W 6166.71 0.55
8639.58 81.58 320.99 3,356.86 5,760.73 N 3,811.44 W 6254.65 1.32
8735.38 81.56 319.96 3,370.90 5,833.83 N 3,871.75 W 6344.21 1.06
8832.76 81.71 319.92 3,385.07 5,907.56 N 3,933.76 W 6435.56 0.16
8929.22 82.09 320.20 3,398.66 5,980.78 N 3,995.07 W 6526.04 0.49
9024.71 81.67 320.21 3,412.15 6,053.42 N 4,055.57 W 6615.52 0.44
9120.51 81.78 320.76 3,425.93 6,126.55 N 4,115.89 W 6705.11 0.58
9216.29 81.74 319.71 3,439.66 6,199.42 N 4,176.52 W 6794.83 1.09
9312.14 81.77 319.71 3,453.41 6,271.77 N 4,237.86 W 6884.88 0.03
9408.04 81.83 320.74 3,467.09 6,344.72 N 4,298.59 W 6974.73 1.06
9504.17 81.80 321.02 3,480.77 6,418.54 N 4,358.63 W 7064.43 0.29
9599.66 81.51 321.13 3,494.63 6,492.04 N 4,417.99 W 7153.39 0.32
9695.47 81.25 320.50 3,508.99 6,565.47 N 4,477.84 W 7242.73 0.70
9791.17 81.31 320.57 3,523.50 6,638.50 N 4,537.96 W 7332.10 0.10
9887.48 80.95 320.33 3,538.35 6,711.87 N 4,598.55 W 7422.05 0.45
9982.71 81.51 320.65 3,552.87 6,784.48 N 4,658.43 W 7510.99 0.68
10078.90 81.19 321.15 3,567.34 6,858.28 N 4,718.41 W 7600.63 0.61
10174.79 81.24 321.14 3,581.98 6,932.08 N 4,777.86 W 7689.82 0.05
10270.32 81.64 320.09 3,596.20 7,005.09 N 4,837.80 W 7779.02 1.16
INSITE V8.0.0 Page 3Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
10365.31 82.48 318.25 3,609.32 7,076.27 N 4,899.31 W 7868.61 2.11
10461.27 83.39 317.03 3,621.13 7,146.63 N 4,963.47 W 7960.04 1.58
10557.61 83.95 317.06 3,631.75 7,216.71 N 5,028.72 W 8052.24 0.58
10652.31 83.96 317.36 3,641.72 7,285.82 N 5,092.69 W 8142.85 0.32
10748.70 83.93 316.45 3,651.89 7,355.82 N 5,158.18 W 8235.22 0.94
10844.53 84.03 316.77 3,661.94 7,425.07 N 5,223.65 W 8327.18 0.35
10903.00 83.97 316.61 3,668.05 7,467.38 N 5,263.54 W 8383.27 0.29
10938.00 84.45 316.00 3,671.58 7,492.56 N 5,287.59 W 8416.92 2.21
10970.85 84.22 315.00 3,674.82 7,515.88 N 5,310.50 W 8448.63 3.11
11066.45 84.57 311.50 3,684.16 7,581.06 N 5,379.79 W 8541.73 3.66
11158.39 85.67 310.00 3,691.99 7,640.85 N 5,449.19 W 8632.11 2.02
11254.10 86.64 310.65 3,698.40 7,702.64 N 5,521.99 W 8726.45 1.22
11282.68 88.26 310.68 3,699.68 7,721.25 N 5,543.65 W 8754.63 5.67
11378.45 91.73 309.86 3,699.68 7,783.14 N 5,616.71 W 8849.24 3.72
11474.35 90.35 308.35 3,697.94 7,843.62 N 5,691.11 W 8944.25 2.13
11570.21 89.62 307.75 3,697.97 7,902.70 N 5,766.60 W 9039.46 0.99
11666.03 90.31 308.89 3,698.03 7,962.11 N 5,841.77 W 9134.58 1.39
11761.92 90.70 310.33 3,697.18 8,023.24 N 5,915.64 W 9229.48 1.56
11857.80 91.06 311.63 3,695.71 8,086.11 N 5,988.01 W 9324.01 1.41
11952.08 90.85 313.15 3,694.14 8,149.66 N 6,057.63 W 9416.55 1.63
12049.42 90.07 314.24 3,693.36 8,216.90 N 6,128.01 W 9511.65 1.38
12145.19 89.66 314.38 3,693.58 8,283.80 N 6,196.54 W 9605.00 0.45
12241.21 89.81 314.63 3,694.03 8,351.11 N 6,265.02 W 9698.52 0.30
12336.91 88.57 314.69 3,695.38 8,418.37 N 6,333.08 W 9791.66 1.30
12432.62 89.86 314.17 3,696.69 8,485.36 N 6,401.42 W 9884.89 1.45
12528.39 90.57 313.37 3,696.33 8,551.61 N 6,470.58 W 9978.44 1.12
12624.21 90.69 312.42 3,695.28 8,616.83 N 6,540.77 W 10072.33 1.00
12720.12 90.13 310.45 3,694.59 8,680.29 N 6,612.67 W 10166.76 2.14
12816.08 89.73 307.87 3,694.71 8,740.88 N 6,687.07 W 10261.83 2.72
12912.44 87.73 306.32 3,696.84 8,798.98 N 6,763.90 W 10357.69 2.63
13007.66 87.24 303.06 3,701.02 8,853.12 N 6,842.11 W 10452.65 3.46
13103.45 88.74 302.24 3,704.38 8,904.76 N 6,922.71 W 10548.35 1.78
13199.38 89.64 302.23 3,705.74 8,955.93 N 7,003.85 W 10644.26 0.94
13295.42 89.07 302.42 3,706.82 9,007.28 N 7,085.00 W 10740.28 0.63
13391.29 88.77 302.30 3,708.63 9,058.58 N 7,165.97 W 10836.12 0.34
13486.84 89.74 301.73 3,709.87 9,109.23 N 7,246.97 W 10931.65 1.18
13581.85 90.51 302.16 3,709.66 9,159.50 N 7,327.60 W 11026.66 0.93
13677.62 91.16 302.44 3,708.27 9,210.67 N 7,408.54 W 11122.41 0.74
13773.18 91.83 302.34 3,705.77 9,261.84 N 7,489.20 W 11217.92 0.71
13868.84 93.30 303.82 3,701.49 9,314.00 N 7,569.27 W 11313.44 2.18
13964.76 93.19 303.79 3,696.06 9,367.28 N 7,648.85 W 11409.12 0.12
14060.40 93.28 302.98 3,690.67 9,419.82 N 7,728.58 W 11504.55 0.85
14156.34 92.95 304.03 3,685.45 9,472.70 N 7,808.46 W 11600.28 1.15
14252.17 91.76 304.59 3,681.51 9,526.67 N 7,887.54 W 11695.90 1.37
14347.96 92.21 306.19 3,678.20 9,582.11 N 7,965.59 W 11791.40 1.73
INSITE V8.0.0 Page 4Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
14443.54 91.52 306.88 3,675.09 9,638.98 N 8,042.34 W 11886.55 1.02
14539.30 91.73 306.14 3,672.37 9,695.93 N 8,119.28 W 11981.89 0.80
14635.07 91.76 305.29 3,669.45 9,751.81 N 8,197.00 W 12077.34 0.89
14731.04 91.53 304.94 3,666.70 9,806.99 N 8,275.47 W 12173.07 0.44
14827.04 91.21 303.00 3,664.40 9,860.61 N 8,355.06 W 12268.94 2.05
14921.95 91.25 302.84 3,662.37 9,912.18 N 8,434.71 W 12363.79 0.17
15017.78 92.68 302.90 3,659.08 9,964.16 N 8,515.15 W 12459.53 1.49
15113.61 91.98 302.74 3,655.18 10,016.06 N 8,595.62 W 12555.25 0.75
15208.89 91.75 302.68 3,652.08 10,067.52 N 8,675.74 W 12650.46 0.25
15304.97 88.34 302.63 3,652.01 10,119.35 N 8,756.63 W 12746.50 3.55
15400.81 87.74 299.97 3,655.29 10,169.11 N 8,838.46 W 12842.28 2.84
15496.74 86.31 298.19 3,660.27 10,215.67 N 8,922.18 W 12937.99 2.38
15591.96 85.78 298.20 3,666.83 10,260.55 N 9,005.90 W 13032.84 0.56
15687.71 89.29 297.87 3,670.95 10,305.51 N 9,090.32 W 13128.32 3.68
15783.57 90.78 296.50 3,670.89 10,349.30 N 9,175.59 W 13223.91 2.11
15879.48 91.35 295.46 3,669.11 10,391.31 N 9,261.79 W 13319.38 1.24
15975.27 89.36 290.63 3,668.52 10,428.79 N 9,349.91 W 13414.12 5.45
16071.23 90.62 290.91 3,668.53 10,462.82 N 9,439.63 W 13508.43 1.35
16166.51 91.73 291.78 3,666.58 10,497.49 N 9,528.35 W 13602.22 1.48
16262.39 93.22 293.75 3,662.44 10,534.55 N 9,616.67 W 13696.92 2.57
16358.16 93.28 295.05 3,657.01 10,574.05 N 9,703.75 W 13791.82 1.36
16453.42 92.91 293.73 3,651.87 10,613.33 N 9,790.38 W 13886.23 1.44
16548.62 92.12 295.25 3,647.69 10,652.75 N 9,876.93 W 13980.64 1.80
16644.33 91.87 296.05 3,644.36 10,694.16 N 9,963.15 W 14075.81 0.88
16739.85 90.22 294.88 3,642.61 10,735.22 N 10,049.37 W 14170.80 2.12
16836.04 90.20 294.34 3,642.26 10,775.27 N 10,136.82 W 14266.31 0.56
16931.84 91.04 290.76 3,641.22 10,812.00 N 10,225.28 W 14360.95 3.84
17027.63 92.36 292.47 3,638.38 10,847.27 N 10,314.29 W 14455.30 2.25
17123.10 93.76 293.71 3,633.29 10,884.66 N 10,401.98 W 14549.63 1.96
17218.96 92.11 293.79 3,628.38 10,923.21 N 10,489.61 W 14644.51 1.72
17314.49 91.85 296.12 3,625.08 10,963.49 N 10,576.16 W 14739.37 2.45
17409.86 92.84 294.40 3,621.17 11,004.15 N 10,662.33 W 14834.11 2.08
17506.22 91.66 291.78 3,617.39 11,041.91 N 10,750.90 W 14929.37 2.98
17602.01 91.82 291.75 3,614.48 11,077.41 N 10,839.82 W 15023.77 0.17
17697.76 91.94 294.59 3,611.34 11,115.06 N 10,927.79 W 15118.47 2.97
17793.52 92.61 293.66 3,607.54 11,154.17 N 11,015.11 W 15213.38 1.20
17889.43 90.92 295.02 3,604.58 11,193.68 N 11,102.45 W 15308.52 2.26
17985.27 88.76 292.47 3,604.85 11,232.26 N 11,190.17 W 15403.49 3.49
18081.14 87.79 290.50 3,607.74 11,267.36 N 11,279.33 W 15497.88 2.29
18176.94 88.84 287.91 3,610.56 11,298.86 N 11,369.75 W 15591.47 2.92
18272.80 89.66 291.20 3,611.81 11,330.93 N 11,460.06 W 15685.26 3.54
18367.17 90.67 291.00 3,611.54 11,364.91 N 11,548.10 W 15778.11 1.09
18463.52 91.36 288.94 3,609.83 11,397.80 N 11,638.64 W 15872.53 2.25
18559.09 91.67 289.77 3,607.31 11,429.47 N 11,728.77 W 15965.96 0.93
18654.49 91.68 291.90 3,604.52 11,463.38 N 11,817.89 W 16059.70 2.23
INSITE V8.0.0 Page 5Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
18750.23 91.08 291.56 3,602.21 11,498.82 N 11,906.80 W 16154.05 0.72
18845.83 91.51 291.27 3,600.05 11,533.71 N 11,995.78 W 16248.18 0.54
18940.92 90.71 289.98 3,598.21 11,567.20 N 12,084.75 W 16341.57 1.60
19036.85 90.65 290.97 3,597.07 11,600.76 N 12,174.62 W 16435.76 1.03
19078.83 90.54 289.09 3,596.63 11,615.13 N 12,214.05 W 16476.91 4.49
19145.00 90.54 289.09 3,596.01 11,636.77 N 12,276.58 W 16541.55 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 301.40 degrees (True)
- A total correction of 19.61 deg from Magnetic north to True north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 19,145.00 feet is 16,915.35 feet along 313.47 degrees (True)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.0 Page 6Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report