Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-154Eni US Operating Co, Inc WELL LOG/DATA TRANSMITTAL To:333 W. 7th Ave, Anchorage, AK 99501 March 6, 2023 Well:OP10-09 LWD/MWD Logs PDF LAS DLIS Excel Mudlogs E-line logs 9-5/8"Multiginger Caliper Log x x PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Edgar Pinzon Mail: edgar.pinzon@eni.com Received By: ___________________________________Date:____________ Eni US Operating Co, Inc. WELL LOG TRANSMITTAL 9905671007 To: Alaska Oil and Gas Conservation Comm. Attn.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Multi Finger Caliper and Leak Detect Log with ACX: OP10-09 L1 Run Date: 5/4/2019 21 X154 30 87 2 May 30, 2019 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 OP10-09 Ll Digital Data in LAS format, Digital Log File 1 CD Rom 50-029-23439-60 RECEIVED JUN 0 3 2019 AOGCC PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com and Amiad.Chaudhry@eni.com Date: Dbl03l1q Signed: Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Nabors 245 Date: December 17, 2013 Surface Data Logging End of Well Report OP10-09L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Mud Record 7. Bit Record 8. Morning Reports 9. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Nabors 245 Well: OP10-09L1 Field: Nikaitchuq Project Borough: North Slope Borough State: Alaska Country: United States API Number: 50-029-23439-60-00 Sperry Job Number: AK-AM-0900918317 Job Start Date: 16 November 2013 Spud Date: 27 November 2013 Total Depth Date: 05 December 2013 Total Depth: 19,145’ MD, 3,596.3’ TVD North Reference: True Declination: 19.615° Dip Angle: 81.022° Total Field Strength: 57628.341 nT Date Of Magnetic Data: 19 November 2013 Wellhead Coordinates N: North 70° 30’ 39.68839” Wellhead Coordinates W: West 149° 51’ 48.33536“ Drill Floor Elevation 53.13’ Ground Elevation: 12.20’ Permanent Datum: Mean Sea Level SDL Engineers: Emil Opitz / Douglas Acker Company Geologist: Andrew Buchanan Company Representatives: Bruce Simonson / Ben Perry SSDS Unit Number: 121 DAILY SUMMARY 11/17/2013 Complete Rig up on OP10-09L1. Transfer production H2O into pits. Bullhead down to kill well. Monitor well and top off pits w/ production H2O. Nipple down Tree and Nipple up BOPs. 11/18/2013 Finish N/U BOPs. PSI test BOPs. IBOP test failed. C/O IBOP on top drive. Trip out of hole w/ 4.5" tubing. 11/19/2013 Trip out of hole pumping down tubing to shear valve. Pump to clear tubing. Trip out of hole filling hole @ 15 bbls/hr. Rig up Halliburton Slickline. Pull slip stop, pull pack off and pump. Rig down Halliburton. Trip out of hole and lay down Pump 11/20/2013 Disconnect inter-connects, flow line, turn buckles and curtain. Level derrick, jack up rig, reconnect inter-connects. Install/remove wear bushing in pipe strap and tally same. M/U Scraper run BHA. Pick Up 4.5" DP t/ 3528'. Cut and slip. Grease top drive, blocks, crown, draw works. Continue Pick Up drill pipe. Filling hole @ 10 bbls/hr. 11/21/2013 Trip in hole w/ scraper and drill pipe. Tag liner @ 11026' MD. Trip in hole. Lay down scraper BHA. Pick up packer BHA. Packer damaged. Clean/service rig. New packer on location. Pick up packer BHA. Trip in hole w/ 4.5" drill pipe. 11/22/2013 Trip in hole and set packer @ 10969' MD. Pull free of packer. Fill hole @ 4 bbls/min. Returns after 30 bbls. Take returns to cuttings box. Circulate until clean returns. Tripped out of hole to surface and laid down packer BHA. Gas: There was a max trip gas of 662 units. 11/23/2013 Rig up Halliburton E-line. Run in hole with E-line t/ 10944' MD, Pulled out of hole. Laid down E- line tools and service tractor and make up tractor. Start in hole, log from 10944' to 8060'. Service rig, mud pumps while running Halliburton logging. 11/24/2013 Adjust centralizers on Halliburton logging tool. Run in hole with logging tools. Log from 10945- 8060' MD. Pulled out of hole and laid down logging tools. Picked up BHA, Tripped in hole, retrieve packer. Monitor well, on vacuum and then tripped out of hole with packer. 11/25/2013 Tripped in hole with packer and set @ 10968'. Test packer, Rigg ed down testing equipment, and begin to trip out of hole. 11/26/2013 Finish tripping out of hole. Tested BOPs and picked up milling BHA and begin to RIH. Shallow hole tested MWD tools. Continue to run in hole. Slip & cut. 11/27/2013 Tripped in hole with whipstock and milling BHA. Set whipstock and begin to displace well to FazePro OBM. Milled window per Baker rep, milling to 10944' MD. 11/28/2013 Tripped out of hole and laid down milling BHA. Picked up BHA #1 and run in hole while picking up 5" Drill pipe singles. 11/29/2013 Run in hole with 5" DP singles, adding rollers, to bottom. Work through window and perform Leak of test. Leak of test to 10.75ppg EMW. Drill ahead. Gas: There was a max gas of 28 units from 11050’ MD with an average drilling gas of 19 units. 11/30/2013 Drill ahead in build section to 11229' MD. Back reamed and CBU per K&M rep. Tripped out of hole and laid down BHA #1. Picked up BHA #2 and tripped out of hole. Gas: The max gas of 541 units from 11194’ MD with an average drilling gas of 154 units. 12/01/2013 Tripped out of hole to 10777' MD. Then slipped and cut drill line. MAD Pass from 10902' to 11229' MD. Drill ahead. Gas: The max gas of 821 units from 11703’ MD with an average drilling gas of 361 units 12/02/2013 Drilled ahead. Gas: The max gas of 871 units from 13979’ MD with an average drilling gas of 464 units. 12/03/2013 Drilled ahead Gas: The max gas of 813 units from 15882’ MD with an average drilling gas of 485 units. 12/04/2013 Drilled ahead. Gas: The max gas of 872 units from 16869’ MD with an average drilling gas of 497 units 12/05/2013 Drilled ahead to TD of 19145' MD. BROOH per K&M. Gas: The max gas of 915 units from 19127’ MD with an average drilling gas of 488 units 12/06/2013 BROOH per K&M to 8383' MD. Tripped out of hole. Gas: There was a max trip gas of 26 units. 12/07/2013 Laid down BHA #2. Picked up and run in hole with whipstock retrieval assembly. Tripped in hole and retrieve whipstock. Tripped out of hole. Then laid down Whipstock and retrieval assembly. 12/08/2013 Rigged up for slotted liner run. Picked up and made up liner packer/hanger and run in hole. 10000 11000 12000 13000 14000 15000 16000 17000 18000 19000 20000 0 5 10 15 Me a s u r e d D e p t h Rig Days Prognosed Actual Days vs. Depth 16 November 2013 Sperry SDL Remain on Location from Previous Well WELL NAME: OP10-09L1 OPERATOR: ENI Petroleum MUD CO: MI Swaco RIG: Nabors 245 SPERRY JOB: AK-XX-0900831473 LOCATION: Oliktok Point AREA: Nikaitchuq Field STATE: Alaska SPUD: 27 Nov 2013 TD: 05 Dec 2013 Commenced 8.75" Milling Window Hole Section @ 10,903' MD On Bot: 22:20 27 Nov 2013 Commenced 8.75" Production Build Section from 10,944' MD to 11,229' MD On Bot: 19:00 29 Nov 2013 Commenced 8.75" Production Section On Bot: 09:40 01 Dec 2013 TD Production Hole Section 19,145' MD, 3,596.3' TVD Off Bot: 11:40 05 Dec 2013 WELL NAME:LOCATION:Oliktok Point OPERATOR:AREA:Nikaitchuq Field SPERRY JOB:STATE:Alaska RIG:Nabors 245 HOLE SECTION Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 ENI Petroleum AK-XX-0900831473 Emil Opitz 7-Dec-2013 OP10-09L1 What went as, or better than, planned: Two of our computers began powering down unexplicably. This happened mulitply time with minimal data lost. Computers will be switched out at the end of the drilling run with new computers from town. Recommendations: Innovations and/or cost savings: Our gas detection worked well with minimal data lost. Difficulties experienced: Continue to troubleshoot computer issue. N/A Surface Data Logging After Action Review WELL NAME:OP10-09L1 LOCATION:Oliktok Point OPERATOR:ENI Petroleum AREA:Nikaitchuq Field MUD CO:MI Swaco STATE:Alaska RIG:Nabors 245 SPUD:27-Nov-2013 SPERRY JOB:AK-XX-0900918317 TD:5-Dec-2013 Marker MD INC AZ TVD TVDSS Top of window 10903.00 83.97 316.61 3668.05 -3614.55 Bottom of window 10920.00 84.20 316.31 3669.80 -3616.30 OA-Sand Top 11160.00 85.69 310.01 3692.11 -3638.61 OA-2 11268.00 87.43 310.66 3699.12 -3645.62 OA-2 11376.00 91.64 309.88 3699.75 -3646.25 OA-2 12808.00 89.76 308.09 3694.75 -3641.25 OA-3 12955.00 87.51 304.86 3698.69 -3645.19 OA-3 14107.00 93.11 303.49 3688.23 -3634.73 OA-2 14249.00 91.80 304.57 3681.79 -3628.29 OA-Sand Top 15368.00 87.94 300.88 3654.25 -3600.75 Fault 1 15407.00 87.65 299.86 3655.73 -3602.23 OA-2 15453.00 86.96 299.00 3657.90 -3604.40 OA-3 15543.00 86.05 298.19 3663.55 -3610.05 OA-3 16383.00 93.18 294.71 3655.87 -3602.37 OA-2 16498.00 92.54 294.44 3650.01 -3596.51 Fault 2 17099.00 93.41 293.40 3635.07 -3581.57 OA-3 17190.00 92.60 293.77 3629.85 -3576.35 OA-2 17382.00 92.43 294.90 3622.85 -3569.35 OA-2 18048.00 88.12 291.18 3607.27 -3553.77 OA-3 18145.00 88.49 288.77 3610.51 -3557.01 TD 8 3/4" Borehole 19145.00 90.53 289.09 3596.51 -3543.01 Formation Tops 8 3/4" Borehole OP10-09L1 Oliktok Point ENI Petroleum Nikaitchuq Field MI Swaco Alaska Nabors 245 27-Nov-2013 AK-XX-0900918317 5-Dec-2013 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/R 6/R3 Cake Solids Oil/Water Alka POM Excess Lime CaCl2 Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb ppb 27-Nov 10927 8.65 49 14 21 9/9/9 4.8 49/35/28/21/8/7 -/1 9.12 69/31 1.55 2.02 25500 Pumping Sweep 28-Nov 10944 8.65 48 13 16 8/8/8 4.4 42/29/24/19/8/6 -/1 7.04 70/30 1.35 1.76 27500 Tripping in hole 29-Nov 11009 8.75 51 14 14 9/9/9 5.6 52/34/29/21/9/8 -/1 7.68 69/31 1.75 2.28 31500 Drilling ahead 30-Nov 11229 8.70 53 15 23 10/10/10 5.2 53/38/30/24/9/8 -/1 7.0 68/32 1.90 2.47 32000 Tripping in hole 1-Dec 12301 8.7 48 13 18 7/8/8 5.8 44/31/26/20/8/7 -/1 7.93 71/29 1.9 2.47 30000 Drilling ahead 2-Dec 14421 8.75 46 12 14 6/6/6 4.8 38/26/21/15/6/5 -/1 9.08 73/27 2 2.6 29000 Drilling ahead 3-Dec 16087 8.75 46 13 20 7/7/7 5.4 46/33/27/20/8/7 -/1 9.86 73/27 2.2 2.86 35500 Drilling ahead 4-Dec 18051 8.75 45 13 16 7/7/7 5.6 42/29/24/18/8/7 -/1 9.68 73/27 1.95 2.54 35500 Drilling ahead 5-Dec 19145 8.7 46 12 18 7/7/7 6.2 42/30/25/18/8/7 -/1 9.82 73/27 2.45 3.19 36500 Backreaming out 6-Dec 19145 8.7 46 12 18 7/7/7 5.8 42/30/24/17/8/7 -/1 11 73/27 2.35 3.06 36500 Tripping out of hole 7-Dec 19145 8.7 46 11 18 7/7/7 5.9 40/29/24/16/8/7 -/1 11 73/27 2.15 2.8 37000 Changing BHA 8-Dec 19145 8.7 47 12 17 7/7/7 5.8 41/29/24/17/8/7 -/1 11 73/27 2.05 2.67 36500 Running liner Casing Record 9.625" Casing @ 10903' MD, 3668'TVD WELL NAME:LOCATION: OPERATOR:AREA: MUD CO:STATE: RIG:SPUD: SPERRY JOB:TD: W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 1 300 1 Smith Milled Tooth XR+8.75 10944 11229 285 4.90 0.746 58.6 10 40 1500 450 1-2-WT-A-E-I-NO-BHA Mud motor BHA - build section 2 400 2 Hycalog SKH616M-E1D PDC 8.75 11229 19145 7916 58.00 0.902 137.7 6 120 2200 450 1-2-BT-N-X-I-NO-TD Production Section TD WELL NAME:OP10-09L1 LOCATION:Oliktok Point OPERATOR:ENI Petroleum AREA:Nikaitchuq Field MUD CO: SPERRY JOB:AK-XX-0900918317 TD:5-Dec-2013 MI Swaco STATE:Alaska RIG:Nabors 245 SPUD:27-Nov-2013 B i t R e c o r d . . * 24 hr Recap:Move rig to OP10-09L1. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 0 16-Nov-2013 12:00 AM Current Pump & Flow Data: Max Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 1 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit #Size 11238' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Hydril 563 Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 Moving Rig PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / C. Sinn Set AtSize 40 #L-80 Grade 9 5/8" (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / C. Sinn 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 27 C-5n C-2 in Minimum Depth Time: Monitor well and top off pits w/ production H2O. N/D Tree. N/U BOPs. - - - Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-09xxxxxx N/U BOPs PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 Production H2O Depth in / out Mud Type Lst Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Hydril 563 100% Gas In Air =10,000 Units Connection 0 No gas. 11238' Condition Bit # 8.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 2 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth 17-Nov-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 20000.00 Complete Rig Up over OP10-09L1. Transfer production H2O into pits. Bullhead down to kill well. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / C. Sinn 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 27 C-5n C-2 in Minimum Depth Time: - - - Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-09xxxxxx Pulling Tubing PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 Production H2O Depth in / out Mud Type Lst Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Hydril 563 100% Gas In Air =10,000 Units Connection 0 No gas. 11238' Condition Bit # 8.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 3 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth 18-Nov-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 20000.00 Finish N/U BOPs. PSI test BOPs. IBOP test failed. C/O IBOP on top drive. TOOH w/ 4.5" tubing. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / C. Sinn 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 28 C-5n C-2 in Minimum Depth Time: R/U Halliburton Slickline. Pull slip stop, pull pack off and pump. R/D Halliburton. TOOH and L/D Pump - - - Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-09xxxxxx L/D Pump PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 Production H2O Depth in / out Mud Type Lst Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Hydril 563 100% Gas In Air =10,000 Units Connection 0 11238' Condition Bit # 8.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 4 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth 19-Nov-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 19000.00 TOOH. Pump down tubing to shear valve. Pump to clear tubing. TOOH. Fill hole @ 15 bbls/hr. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Disconnect inter-connects, flow line, turn buckles and curtain. Level derrick, jack up rig, reconnect inter-connects. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 19000.00 0 20-Nov-2013 12:00 AM Current Pump & Flow Data: Max Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 5 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Condition Bit # 8.50 Size No Gas. Grease top drive, blocks, crown, draw works. Continue P/U drill pipe. Filling hole @ 10 bbls/hr. 11238' 100% Gas In Air =10,000 Units Connection 0 Tools API FL Chromatograph (ppm) WOB Hydril 563 Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Type Production H2O Depth in / out YP (lb/100ft 2) 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-09xxxxxx L/D Pump PV Footage Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: Install/remove wear bushing in pipe strap and tally same. M/U Scraper run BHA. P/U 4.5" DP t/ 3528'. Cut and slip. in Minimum Depth C-5n C-2 SPP (psi) Gallons/stroke TFA Bit Type Depth 28 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / C. Sinn Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / C. Sinn 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 27 C-5n C-2 in Minimum Depth Time: Packer damaged. Clean/service rig. New packer on location. P/U packer BHA. TIH w/ 4.5" drill pipe. - - - Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 TIH w/ Packer PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 Production H2O Depth in / out Mud Type Lst Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Hydril 563 100% Gas In Air =10,000 Units Connection 0 No Gas. 11238' Condition Bit # 8.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 6 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth 21-Nov-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 19000.00 TIH w/ scraper and drill pipe. Tag liner @ 11026' MD. TIH. L/D scraper BHA. P/U packer BHA. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: TIH, set packer @ 10969' MD. Pull free of packer. Fill hole @ 4 bbls/min. Returns after 30 bbls. Take returns Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 18000.00 0 22-Nov-2013 12:00 AM Current Pump & Flow Data: Max Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 7 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Condition Bit # 8.50 Size 662 units of max trip gas. 11238' 100% Gas In Air =10,000 Units Connection 0 Tools API FL Chromatograph (ppm) WOB Hydril 563 Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average 662 Mud Type Lst Type Production H2O Depth in / out YP (lb/100ft 2) 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 L/D Packer BHA PV Footage Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: to cuttings box. Circulate until clean returns. TOOH t/ surface. L/D packer BHA. in Minimum Depth C-5n C-2 SPP (psi) Gallons/stroke TFA Bit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 27 C-5n C-2 in Minimum Depth Time: start in hole, log f/ 10944' t/ 8060'. Service rig, mud pumps while running Halliburton logging. - - - Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 Service Rig PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 Production H2O Depth in / out Mud Type Lst Type Average 0Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Hydril 563 100% Gas In Air =10,000 Units Connection 0 No Trip Gas. 11238' Condition Bit # 8.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 8 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth 23-Nov-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 19000.00 R/U Halliburton E-line. RIH w/ E-line t/ 10944' MD, POOH. L/D E-line tools and service tractor. M/U tractor Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 28 C-5n C-2 in Minimum Depth Time: L/D logging tools. P/U BHA, TIH, retrieve packer. Monitor well, on vacuum. TOOH w/ packer. - - - Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 TOOH w/ Packer PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 Production H2O Depth in / out Mud Type Lst Type Average 0Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Hydril 563 100% Gas In Air =10,000 Units Connection 0 No Trip Gas. 11238' Condition Bit # 8.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 8 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth 24-Nov-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 18000.00 Adjust centralizers on Halliburton logging tool. RIH w/ logging tools. Log f/ 10945-8060' MD. POOH. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: TIH w/ packer and set @ 10968'. Test packer, R/D testing equipment, and begin to TOOH. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 19000 0 25-Nov-2013 24:00 Current Pump & Flow Data: Max Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 10 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Condition Bit # 8.50 Size No Trip Gas. 11238' 100% Gas In Air =10,000 Units Connection 0 Tools API FL Chromatograph (ppm) WOB Hydril 563 Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average 0 Mud Type Lst Type Production H2O Depth in / out YP (lb/100ft 2) 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 TOOH PV Footage Simonson / Sherman Sh Clyst Tuff Gvl Coal cP Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: in Minimum Depth C-5n C-2 SPP (psi) Gallons/stroke TFA Bit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 27 C-5n C-2 in Minimum Depth Time: - - - Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Sherman Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 RIH with milling BHA PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 Production H2O Depth in / out Mud Type Lst Type Average 0Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Hydril 563 100% Gas In Air =10,000 Units Connection 0 No Trip Gas. 11238' Condition Bit # 8.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 11 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth 26-Nov-2013 24:00 Current Pump & Flow Data: Max 0 Chlorides mg/l 19000 Finish TOOH. Test BOPs. P/U milling BHA and begin to RIH. Shallow test MWD tools. Continue to RIH. Slip & cut. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: TIH with whipstock/milling BHA. Set whipstock and begin to displace well to FazePro OBM. Mill window per Baker Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 25500 0 27-Nov-2013 24:00 Current Pump & Flow Data: 2090 Max Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 12 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Condition Bit # 9.1 8.65 Size No Trip Gas. 11238' 100% Gas In Air =10,000 Units Connection 0 Tools API FL Chromatograph (ppm) WOB Hydril 563 Avg Min Comments RPM ECD (ppg) ml/30min 0Background (max) Trip Average 0 Mud Type Lst Type FazePro 4.8 10927'21 Depth in / out YP (lb/100ft 2) 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 Mill window PV Footage Perry / Sherman Sh Clyst Tuff Gvl Coal cP 14 Gas Summary 0 0 0 (current) Avg to 10903' Yesterday's Depth: Current Depth: 24 Hour Progress: 30.4 Flow In (gpm) Flow In (spm) 10903' 10944' 41' Max @ ft Current 10936'12.3 Date: Time: rep, milling to 10944' MD. in Minimum Depth C-5n C-2 SPP (psi) Gallons/stroke TFA Bit Type Depth 49 MBT 10944' pH 0 0 0 Siltst 509 119 Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 MBT 10944' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 48 C-5n C-2 in Minimum Depth Time: 10944' 10944' 0' Max @ ft Current Date: Avg to 10944' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Sherman Sh Clyst Tuff Gvl Coal cP 13 Footage Ss (ppb Eq) C-1 C-5i AK-AM-0900918317 P/U 5" DP PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 FazePro 4.4 10944'16 Depth in / out Mud Type Lst Type Average 00Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Hydril 563 100% Gas In Air =10,000 Units Connection 0 No Trip Gas. 11238' Condition Bit # 7.0 8.65 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 13 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth 28-Nov-2013 24:00 Current Pump & Flow Data: Max 0 Chlorides mg/l 27500 TOOH and L/D milling BHA. P/U BHA #1 and RIH, while P/U 5" DP singles. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: RIH with 5" DP singles, adding rollers, to bottom. Work through window and perform LOT. LOT to 10.75ppg EMW. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 31500 0 29-Nov-2013 24:00 Current Pump & Flow Data: 2161 Max Intermediate - TOL @ 10759' ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 14 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Condition Bit # 1 7.9 8.75 8.70 Smith XR+ 8.75 Size 11238' 100% Gas In Air =10,000 Units -Connection 0 Tools 1.83* XP Motor, TeleScope 675 API FL Chromatograph (ppm) 10944' WOB Hydril 563 Avg Min Comments RPM ECD (ppg) ml/30min 4Background (max) Trip Average - Mud Type Lst Type FazePro 5.6 11009'16 Depth in / out YP (lb/100ft 2) 69/31 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 1 Hours C-3 Ss (Pom) C-1 C-5i AK-AM-0900918317 Drilling ahead PV Footage Perry / Sherman Sh Clyst Tuff Gvl Coal cP 18 Gas Summary 0 0 0 (current) Avg to 10944' Yesterday's Depth: Current Depth: 24 Hour Progress: 117.6 Flow In (gpm) Flow In (spm) 10944' 11102' 158' Max @ ft Current 11069'62.7 Date: Time: Drill ahead. 10 in 2 10981'Minimum Depth C-5n 11050' 90.0 C-2 28 SPP (psi) Gallons/stroke TFA Bit Type Depth 1.75 51 Alkal Mud 11102' Oil/Water 0.746 0 0 0 Siltst 480 112 Units* Casing Summary Lithology (%) 01371 479 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 10 0 Cly 3818 . . * 24 hr Recap: (max) (current) 341 0 Cly 65415 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 15 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker 16666 1671 Units* Casing Summary Lithology (%) 19 Alkal Mud 11229' Oil/Water 0.746 0 69 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 1.90 53 C-5n 11194' C-2 541 in 11 11107'Minimum Depth Time: and TIH. 154 11102' 11229' 127' Max @ ft Current 11127'82.8 Date: Avg to 11102' Yesterday's Depth: Current Depth: 24 Hour Progress: 135.7 Flow In (gpm) Flow In (spm) Gas Summary 0 62 30 (current) Perry / Sherman Sh Clyst Tuff Gvl Coal cP 15 285' 8.75 0.902 Footage 4.90 Ss (Pom) C-1 C-5i AK-AM-0900918317 TIH w/ BHA #2 PV 24 hr Max Weight 90 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 68/32 318 7 40.0 Hycalog SKY616M-E1D FazePro 5.2 11129' 11229'23 Depth in / out Mud Type Lst Type Average 86 -Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools 1.83* XP Motor, TeleScope 675 API FL Chromatograph (ppm) 10.0 10944' 11129' WOB Hydril 563 100% Gas In Air =10,000 Units -Connection 124 2 11238' Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 7.0 8.75 Smith XR+ 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 15 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 30-Nov-2013 24:00 Current Pump & Flow Data: Max 32 Chlorides mg/l 32000 Drill ahead in build section to 11229' MD. Backream and CBU per K&M rep. TOOH and L/D BHA #1. P/U BHA #2 Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: TIH to 10777' MD. Slip and cut. MAD Pass from 10902' to 11229' MD. Drill ahead. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 30000 148 1-Dec-2013 24:00 Current Pump & Flow Data: 2412 Max TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 16 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.51 Nabors 245E Report For: Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 7.9 8.75 8.70 Smith XR+ 8.70 Size 2 11238' 100% Gas In Air =10,000 Units -Connection 225 Tools Xceed 675; PeriScope 675; TeleScope 675; Neoscope API FL Chromatograph (ppm) 10.0 10944' 11129' WOB Hydril 563 10.02 10.27 Avg Min Comments RPM ECD (ppg) ml/30min 90 Background (max) Trip Average 21 Mud Type Lst Type 40.0 Hycalog SKY616M-E1D FazePro 5.8 11129' 12301'18 Depth in / out YP (lb/100ft 2) 71/29 27 99 52 014 Cement Cht Silt C-4i C-4n 24 hr Max Weight 315 Hours C-3 Ss (Pom) C-1 C-5i AK-AM-0900918317 Drilling Ahead PV 285' 8.75 0.902 Footage 4.90 Perry / Sherman Sh Clyst Tuff Gvl Coal cP 13 Gas Summary 8 127 61 (current) Avg to 11229' Yesterday's Depth: Current Depth: 24 Hour Progress: 296.9 Flow In (gpm) Flow In (spm) 11229' 12615' 1386' Max @ ft Current 11646'190.3 Date: Time: 361 in 54 11472'Minimum Depth C-5n 11703' 159.0 C-2 821 SPP (psi) Gallons/stroke TFA Bit Type Depth 1.90 48 Alkal Mud 12615' Oil/Water 0.746 18 133 13 Siltst 498 118 Units* Casing Summary Lithology (%) 99 49111 6468 907-685-1490 Unit Phone: 32 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 552 41 Cly 95797 . . * 24 hr Recap: (max) (current) 590 57 Cly 97413 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 78 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker 46904 4209 497 118 Units* Casing Summary Lithology (%) 148 Alkal Mud 14704' Oil/Water 0.746 59 220 73 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 2.00 46 C-5n 13979' 149.6 C-2 871 in 61 14422'Minimum Depth Time: 464 12615' 14704' 2089' Max @ ft Current 14130'181.4 Date: Avg to 12615' Yesterday's Depth: Current Depth: 24 Hour Progress: 277.9 Flow In (gpm) Flow In (spm) Gas Summary 76 234 143 (current) Perry / Sherman Sh Clyst Tuff Gvl Coal cP 12 285' 8.75 0.902 Footage 4.90 Ss (Pom) C-1 C-5i AK-AM-0900918317 Drilling Ahead PV 24 hr Max Weight 325 Hours C-3 45 91 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 73/27 57 162 104 40.0 Hycalog SKY616M-E1D FazePro 4.8 11129' 14421'14 Depth in / out Mud Type Lst Type Average -65 Background (max) Trip 9.92 10.27 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 675; PeriScope 675; TeleScope 675; Neoscope API FL Chromatograph (ppm) 10.0 10944' 11129' WOB Hydril 563 100% Gas In Air =10,000 Units -Connection 300 2 11238' Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 9.1 8.75 8.80 Smith XR+ 8.75 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.51 Nabors 245E Report For: Morning Report Report # 17 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 2-Dec-2013 24:00 Current Pump & Flow Data: 2597 Max 184 Chlorides mg/l 29000 Drilling ahead. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Drilling ahead. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 35500 179 3-Dec-2013 24:00 Current Pump & Flow Data: 2839 Max TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 18 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.92 Nabors 245E Report For: Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 9.9 8.75 8.75 Smith XR+ 8.75 Size 2 11238' 100% Gas In Air =10,000 Units -Connection 320 Tools Xceed 675; PeriScope 675; TeleScope 675; Neoscope API FL Chromatograph (ppm) 10.0 10944' 11129' WOB Hydril 563 10.28 10.57 Avg Min Comments RPM ECD (ppg) ml/30min 28 Background (max) Trip Average - Mud Type Lst Type 40.0 Hycalog SKY616M-E1D FazePro 5.4 11129' 16087'20 Depth in / out YP (lb/100ft 2) 73/27 59 153 103 41 75 Cement Cht Silt C-4i C-4n 24 hr Max Weight 315 Hours C-3 Ss (Pom) C-1 C-5i AK-AM-0900918317 Drilling Ahead PV 285' 8.75 0.902 Footage 4.90 Perry / Sherman Sh Clyst Tuff Gvl Coal cP 13 Gas Summary 66 238 145 (current) Avg to 14704' Yesterday's Depth: Current Depth: 24 Hour Progress: 271.9 Flow In (gpm) Flow In (spm) 14704' 16331' 1627' Max @ ft Current 15977'165.3 Date: Time: 485 in 43 16049'Minimum Depth C-5n 15882' 44.2 C-2 813 SPP (psi) Gallons/stroke TFA Bit Type Depth 2.20 46 Alkal Mud 16331' Oil/Water 0.746 51 224 64 Siltst 506 119 Units* Casing Summary Lithology (%) 140 47353 2479 907-685-1490 Unit Phone: 81 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 596 39 Cly 89121 . . * 24 hr Recap: (max) (current) 713 87 Cly 94067 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 81 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker 47527 6099 499 118 Units* Casing Summary Lithology (%) 168 Alkal Mud 18255' Oil/Water 0.746 82 240 80 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 1.95 45 C-5n 16869' 139.6 C-2 872 in 74 17482'Minimum Depth Time: 497 16331' 18255' 1924' Max @ ft Current 18061'182.2 Date: Avg to 16331' Yesterday's Depth: Current Depth: 24 Hour Progress: 261.0 Flow In (gpm) Flow In (spm) Gas Summary 69 244 143 (current) Perry / Ruminer Sh Clyst Tuff Gvl Coal cP 13 285' 8.75 0.902 Footage 4.90 Ss (Pom) C-1 C-5i AK-AM-0900918317 Drilling Ahead PV 24 hr Max Weight 411 Hours C-3 43 89 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 73/27 63 178 109 40.0 Hycalog SKY616M-E1D FazePro 5.6 11129' 18051'16 Depth in / out Mud Type Lst Type Average -113 Background (max) Trip 10.53 10.98 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 675; PeriScope 675; TeleScope 675; Neoscope API FL Chromatograph (ppm) 10.0 10944' 11129' WOB Hydril 563 100% Gas In Air =10,000 Units -Connection 378 2 11238' Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 9.7 8.75 8.75 Smith XR+ 8.75 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.69 Nabors 245E Report For: Morning Report Report # 19 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 4-Dec-2013 24:00 Current Pump & Flow Data: 2954 Max 261 Chlorides mg/l 35500 Drilling ahead. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Drilled ahead to TD of 19145' MD. BROOH per K&M. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 36500 342 5-Dec-2013 24:00 Current Pump & Flow Data: 2681 Max TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 20 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.16 Nabors 245E Report For: Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 9.8 8.75 8.75 Smith XR+ 8.70 Size 2 11238' 100% Gas In Air =10,000 Units -Connection 663 Tools Xceed 675; PeriScope 675; TeleScope 675; Neoscope API FL Chromatograph (ppm) 10.0 10944' 11129' WOB Hydril 563 10.70 10.98 Avg Min Comments RPM ECD (ppg) ml/30min 23 Background (max) Trip Average 99 Mud Type Lst Type 40.0 Hycalog SKY616M-E1D FazePro 6.2 11129' 19145'18 Depth in / out YP (lb/100ft 2) 73/27 71 207 120 46 99 Cement Cht Silt C-4i C-4n 24 hr Max Weight 455 Hours C-3 Ss (Pom) C-1 C-5i AK-AM-0900918317 BROOH PV 285' 8.75 0.902 Footage 4.90 Perry / Ruminer Sh Clyst Tuff Gvl Coal cP 12 Gas Summary 74 343 173 (current) Avg to 18255' Yesterday's Depth: Current Depth: 24 Hour Progress: 263.2 Flow In (gpm) Flow In (spm) 18255' 19145' 890' Max @ ft Current 19124'163.9 Date: Time: 488 in 71 18369'Minimum Depth C-5n 19127' C-2 915 SPP (psi) Gallons/stroke TFA Bit Type Depth 2.45 46 Alkal Mud 19145' Oil/Water 0.746 100 306 81 Siltst 496 117 Units* Casing Summary Lithology (%) 186 47366 5089 907-685-1490 Unit Phone: 100 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 893 84 Cly 95778 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 Alkal Mud 19145' Oil/Water 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 2.35 46 C-5n C-2 in Minimum Depth Time: 19145' 19145' 0' Max @ ft Current Date: Avg to 19145' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Ruminer Sh Clyst Tuff Gvl Coal cP 12 285' 8.75 0.902 Footage 4.90 Ss (Pom) C-1 C-5i AK-AM-0900918317 L/D BHA #2 PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 73/27 000 40.0 Hycalog SKY616M-E1D FazePro 5.8 11129' 19145'18 Depth in / out Mud Type Lst Type Average 26 -Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 675; PeriScope 675; TeleScope 675; Neoscope API FL Chromatograph (ppm) 10.0 10944' 11129' WOB Hydril 563 100% Gas In Air =10,000 Units -Connection 0 2 11238' Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 9.6 8.75 Smith XR+ 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 21 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 6-Dec-2013 24:00 Current Pump & Flow Data: Max 0 Chlorides mg/l 36500 BROOH per K&M to 8383' MD. TOOH. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 Alkal Mud 19145' Oil/Water 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 2.15 46 C-5n C-2 in Minimum Depth Time: retrieval assemtly.. 19145' 19145' 0' Max @ ft Current Date: Avg to 19145' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Ruminer Sh Clyst Tuff Gvl Coal cP 11 285' 8.75 0.902 Footage 58.00 7916' 4.90 Ss (Pom) C-1 C-5i AK-AM-0900918317 R/U Slotted Liner PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 73/27 000 120 40.0 Hycalog SKY616M-E1D FazePro 5.9 11129' 19145'18 19145' Depth in / out Mud Type Lst Type Average --Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 6 10.0 10944' 11129' WOB Hydril 563 100% Gas In Air =10,000 Units -Connection 0 2 11238' Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 9.6 8.75 Smith XR+ 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 22 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point 1-2-BT-N-X-I-NO-TD TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 7-Dec-2013 24:00 Current Pump & Flow Data: Max 0 Chlorides mg/l 37000 L/D BHA #2. P/U and RIH w/ whipstock retrieval assembly. TIH. Retrieve whipstock and TOOH. L/D Whipstock and Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: R/U for slotted liner run. P/U and M/U liner packer/hanger and RIH. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 36500 0 8-Dec-2013 24:00 Current Pump & Flow Data: Max 1-2-BT-N-X-I-NO-TD TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 23 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 9.6 8.75 Smith XR+ 8.70 Size 2 11238' 100% Gas In Air =10,000 Units -Connection 0 Tools API FL Chromatograph (ppm) 6 10.0 10944' 11129' WOB Hydril 563 Avg Min Comments RPM ECD (ppg) ml/30min -Background (max) Trip Average - Mud Type Lst Type 120 40.0 Hycalog SKY616M-E1D FazePro 5.8 11129' 19145'17 19145' Depth in / out YP (lb/100ft 2) 73/27 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (Pom) C-1 C-5i AK-AM-0900918317 RIH w/ Slotted Liner PV 285' 8.75 0.902 Footage 58.00 7916' 4.90 Perry / Ruminer Sh Clyst Tuff Gvl Coal cP 12 Gas Summary 0 0 0 (current) Avg to 19145' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 19145' 19145' 0' Max @ ft Current Date: Time: in Minimum Depth C-5n C-2 SPP (psi) Gallons/stroke TFA Bit Type Depth 2.05 47 Alkal Mud 19145' Oil/Water 0.746 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40 # L-80 Grade 9 5/8" 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 Alkal Mud 19145' Oil/Water 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 2.05 46 C-5n C-2 in Minimum Depth Time: 19145' 19145' 0' Max @ ft Current Date: Avg to 19145' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Ruminer Sh Clyst Tuff Gvl Coal cP 11 285' 8.75 0.902 Footage 58.00 7916' 4.90 Ss (Pom) C-1 C-5i AK-AM-0900918317 L/D DP PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 73/27 000 120 40.0 Hycalog SKY616M-E1D FazePro 5.9 11129' 19145'19 19145' Depth in / out Mud Type Lst Type Average --Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 6 10.0 10944' 11129' WOB Hydril 563 100% Gas In Air =10,000 Units -Connection 0 2 11238' Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 11.0 8.75 Smith XR+ 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 24 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point 1-2-BT-N-X-I-NO-TD TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 9-Dec-2013 24:00 Current Pump & Flow Data: Max 0 Chlorides mg/l 36500 Finish RIH with slotted liner to bottom. Begin to L/D drill pipe. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Displace well to brine. L/D 4.5" DP. Begin BOP testing. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 38500 0 10-Dec-2013 24:00 Current Pump & Flow Data: Max 1-2-BT-N-X-I-NO-TD TOW 10903' - BOW 10920' MD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 25 Customer: Well: Area: Location: Rig: OP10-09L1 Eni Petroleum Nikaitchuq Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Condition 1-2-WT-A-E-I-NO-BHA Bit # 1 8.75 Smith XR+ 8.70 Size 2 11238' 100% Gas In Air =10,000 Units -Connection 0 Tools API FL Chromatograph (ppm) 6 10.0 10944' 11129' WOB Hydril 563 Avg Min Comments RPM ECD (ppg) ml/30min -Background (max) Trip Average - Mud Type Lst Type 120 40.0 Hycalog SKY616M-E1D Brine 11129' 19145' 19145' Depth in / out YP (lb/100ft 2) 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (Pom) C-1 C-5i AK-AM-0900918317 Test BOPs PV 285' 8.75 0.902 Footage 58.00 7916' 4.90 Perry / Ruminer Sh Clyst Tuff Gvl Coal cP Gas Summary 0 0 0 (current) Avg to 19145' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 19145' 19145' 0' Max @ ft Current Date: Time: in Minimum Depth C-5n C-2 SPP (psi) Gallons/stroke TFA Bit Type Depth 28 Alkal Mud 19145' Oil/Water 0.746 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Emil Opitz Maximum Report By: Logging Engineers: E. Opitz / D. Acker Set At Size 40 # L-80 Grade 9 5/8" (max) (current) 0 0 Cly 0 WELL INFORMATION Created On : Jan 03 2014 Customer :Eni Petroleum Well Name :OP10-09L1 Job Number :AK-XX-0900918317 Rig Name :Nabors 245E Field Name :Nikaitchuq Country :USA Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 168.38 0.37 125.76 168.38 0.32 S 0.44 E -0.54 0.22 259.84 1.19 14.76 259.83 0.43 N 0.92 E -0.56 1.49 259.86 1.19 14.76 259.85 0.43 N 0.92 E -0.56 1.71 297.16 1.80 7.22 297.14 1.38 N 1.10 E -0.21 1.71 297.18 1.80 7.22 297.16 1.38 N 1.10 E -0.21 1.69 327.80 2.29 2.42 327.76 2.47 N 1.18 E 0.28 1.69 357.85 2.63 356.91 357.78 3.76 N 1.17 E 0.96 1.38 388.34 3.17 353.03 388.23 5.30 N 1.03 E 1.88 1.88 418.71 3.44 359.57 418.55 7.04 N 0.92 E 2.88 1.53 448.53 3.76 354.23 448.31 8.91 N 0.82 E 3.95 1.55 478.85 4.16 352.58 478.56 10.99 N 0.57 E 5.24 1.37 509.89 5.29 347.62 509.50 13.50 N 0.12 E 6.93 3.87 541.07 6.24 346.71 540.52 16.56 N 0.58 W 9.12 3.06 572.47 7.43 345.37 571.69 20.18 N 1.48 W 11.78 3.82 602.79 8.89 340.16 601.71 24.28 N 2.77 W 15.02 5.39 634.03 10.10 340.15 632.52 29.13 N 4.52 W 19.04 3.87 730.40 12.76 344.43 726.97 47.33 N 10.25 W 33.41 2.90 825.98 13.59 345.13 820.03 68.35 N 15.96 W 49.24 0.88 921.11 15.97 349.65 912.01 92.03 N 21.18 W 66.03 2.78 1016.85 17.39 350.91 1,003.72 119.12 N 25.81 W 84.09 1.53 1079.10 18.77 352.63 1,062.90 138.24 N 28.56 W 96.41 2.38 1175.59 22.01 351.93 1,153.33 171.55 N 33.10 W 117.63 3.37 1240.42 24.70 349.95 1,212.84 196.92 N 37.17 W 134.32 4.32 1270.73 25.96 349.06 1,240.24 209.66 N 39.53 W 142.98 4.34 1366.11 29.65 347.27 1,324.59 253.19 N 48.69 W 173.48 3.97 1461.33 32.53 345.56 1,406.13 300.97 N 60.27 W 208.25 3.16 1558.29 32.21 345.05 1,488.02 351.18 N 73.44 W 245.65 0.43 1653.45 32.88 344.44 1,568.24 400.57 N 86.91 W 282.88 0.78 1748.12 33.51 344.65 1,647.46 450.52 N 100.72 W 320.70 0.68 1845.90 33.65 345.50 1,728.92 502.78 N 114.65 W 359.81 0.50 INSITE V8.0.0 Page 1Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1941.93 37.42 345.50 1,807.05 556.81 N 128.62 W 399.89 3.93 2036.21 40.34 343.82 1,880.44 613.86 N 144.30 W 442.99 3.29 2132.86 42.74 342.86 1,952.78 675.25 N 162.69 W 490.67 2.57 2227.77 46.76 341.50 2,020.17 738.84 N 183.16 W 541.27 4.35 2324.34 49.73 338.45 2,084.48 806.49 N 207.86 W 597.60 3.87 2404.15 51.66 335.67 2,135.04 863.34 N 231.94 W 647.78 3.62 2514.09 53.67 335.60 2,201.71 942.96 N 268.00 W 720.05 1.83 2546.10 54.34 335.65 2,220.53 966.55 N 278.69 W 741.46 2.10 2609.39 56.23 333.69 2,256.57 1,013.56 N 300.96 W 784.96 3.92 2705.66 59.77 331.12 2,307.58 1,085.88 N 338.79 W 854.93 4.32 2801.55 62.76 328.40 2,353.68 1,158.49 N 381.15 W 928.92 3.99 2897.71 66.14 326.09 2,395.16 1,231.42 N 428.10 W 1006.99 4.13 2992.15 68.62 325.38 2,431.48 1,303.45 N 477.18 W 1086.41 2.72 3089.29 71.66 324.29 2,464.47 1,378.13 N 529.80 W 1170.23 3.30 3184.76 75.95 324.06 2,491.10 1,452.45 N 583.45 W 1254.74 4.50 3282.04 79.37 322.99 2,511.88 1,528.85 N 639.94 W 1342.77 3.68 3377.50 81.28 323.15 2,527.93 1,604.07 N 696.48 W 1430.21 2.01 3472.50 81.56 322.87 2,542.10 1,679.10 N 753.00 W 1517.55 0.41 3568.20 81.31 322.86 2,556.35 1,754.54 N 810.13 W 1605.62 0.26 3665.39 81.28 321.76 2,571.06 1,830.56 N 868.86 W 1695.36 1.12 3759.45 81.03 323.31 2,585.53 1,904.33 N 925.40 W 1782.05 1.65 3855.50 81.21 323.39 2,600.35 1,980.47 N 982.04 W 1870.07 0.20 3949.83 81.50 324.26 2,614.53 2,055.74 N 1,037.09 W 1956.27 0.96 4045.08 80.66 323.57 2,629.30 2,131.79 N 1,092.51 W 2043.20 1.14 4141.87 80.07 322.74 2,645.50 2,208.15 N 1,149.73 W 2131.82 1.04 4237.62 80.52 322.84 2,661.64 2,283.32 N 1,206.81 W 2219.70 0.48 4333.94 81.23 322.17 2,676.92 2,358.77 N 1,264.69 W 2308.42 1.01 4429.46 80.93 323.13 2,691.73 2,433.78 N 1,321.94 W 2396.37 1.04 4525.15 80.85 323.51 2,706.88 2,509.56 N 1,378.38 W 2484.02 0.40 4621.16 80.97 324.08 2,722.05 2,586.06 N 1,434.38 W 2571.67 0.60 4715.79 80.97 324.73 2,736.90 2,662.05 N 1,488.78 W 2657.70 0.68 4811.87 80.63 325.06 2,752.26 2,739.64 N 1,543.32 W 2744.68 0.49 4908.23 80.83 324.31 2,767.78 2,817.24 N 1,598.29 W 2832.03 0.80 5004.20 80.73 323.53 2,783.16 2,893.80 N 1,654.08 W 2919.54 0.81 5098.88 80.66 323.03 2,798.47 2,968.70 N 1,709.95 W 3006.24 0.53 5195.58 80.69 323.44 2,814.14 3,045.14 N 1,767.06 W 3094.82 0.42 5291.55 80.78 323.24 2,829.59 3,121.12 N 1,823.61 W 3182.68 0.23 5386.54 80.77 323.08 2,844.82 3,196.16 N 1,879.83 W 3269.76 0.17 5482.82 80.74 323.03 2,860.29 3,272.11 N 1,936.95 W 3358.08 0.06 5578.93 80.88 323.11 2,875.64 3,347.95 N 1,993.95 W 3446.25 0.17 5674.50 80.68 323.02 2,890.95 3,423.35 N 2,050.64 W 3533.92 0.23 5770.14 80.71 322.95 2,906.41 3,498.71 N 2,107.46 W 3621.69 0.08 5866.30 80.59 322.40 2,922.03 3,574.16 N 2,164.99 W 3710.10 0.58 5961.83 80.83 321.78 2,937.46 3,648.55 N 2,222.92 W 3798.30 0.69 6057.70 80.95 321.45 2,952.64 3,722.75 N 2,281.69 W 3887.13 0.36 INSITE V8.0.0 Page 2Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6152.64 80.85 321.08 2,967.65 3,795.87 N 2,340.35 W 3975.29 0.40 6249.20 81.23 320.33 2,982.69 3,869.69 N 2,400.76 W 4065.31 0.86 6343.47 79.93 320.21 2,998.12 3,941.21 N 2,460.20 W 4153.31 1.38 6440.35 81.20 320.43 3,014.00 4,014.76 N 2,521.22 W 4243.71 1.33 6536.21 81.51 321.35 3,028.41 4,088.29 N 2,581.00 W 4333.05 1.00 6628.19 81.13 321.50 3,042.29 4,159.38 N 2,637.70 W 4418.48 0.44 6726.52 80.67 320.88 3,057.84 4,235.04 N 2,698.55 W 4509.84 0.78 6821.76 80.56 320.90 3,073.37 4,307.95 N 2,757.82 W 4598.42 0.12 6917.67 80.99 321.32 3,088.75 4,381.63 N 2,817.26 W 4687.54 0.62 7014.43 80.19 321.74 3,104.57 4,456.37 N 2,876.64 W 4777.17 0.93 7110.15 80.47 321.82 3,120.65 4,530.50 N 2,935.02 W 4865.62 0.30 7206.52 80.42 323.12 3,136.64 4,605.86 N 2,992.91 W 4954.30 1.33 7301.26 80.23 324.21 3,152.57 4,681.10 N 3,048.25 W 5040.73 1.15 7396.90 80.26 324.07 3,168.77 4,757.49 N 3,103.46 W 5127.66 0.15 7492.92 80.46 325.22 3,184.85 4,834.69 N 3,158.24 W 5214.64 1.20 7589.16 80.34 325.95 3,200.90 4,912.97 N 3,211.87 W 5301.20 0.76 7683.58 80.62 326.41 3,216.52 4,990.34 N 3,263.70 W 5385.75 0.56 7754.47 80.99 326.38 3,227.85 5,048.62 N 3,302.43 W 5449.17 0.52 7779.10 81.26 325.32 3,231.65 5,068.76 N 3,316.09 W 5471.32 4.39 7874.18 81.68 325.14 3,245.75 5,146.00 N 3,369.71 W 5557.33 0.48 7975.31 81.70 325.39 3,260.37 5,228.23 N 3,426.73 W 5648.85 0.25 8066.10 81.26 326.74 3,273.82 5,302.73 N 3,476.85 W 5730.44 1.55 8162.70 81.50 325.92 3,288.30 5,382.21 N 3,529.80 W 5817.05 0.88 8257.55 81.83 324.74 3,302.05 5,459.40 N 3,583.19 W 5902.83 1.28 8353.13 81.82 323.52 3,315.64 5,536.06 N 3,638.62 W 5990.09 1.26 8449.19 81.77 322.78 3,329.35 5,612.14 N 3,695.64 W 6078.40 0.76 8544.85 81.71 322.25 3,343.09 5,687.26 N 3,753.25 W 6166.71 0.55 8639.58 81.58 320.99 3,356.86 5,760.73 N 3,811.44 W 6254.65 1.32 8735.38 81.56 319.96 3,370.90 5,833.83 N 3,871.75 W 6344.21 1.06 8832.76 81.71 319.92 3,385.07 5,907.56 N 3,933.76 W 6435.56 0.16 8929.22 82.09 320.20 3,398.66 5,980.78 N 3,995.07 W 6526.04 0.49 9024.71 81.67 320.21 3,412.15 6,053.42 N 4,055.57 W 6615.52 0.44 9120.51 81.78 320.76 3,425.93 6,126.55 N 4,115.89 W 6705.11 0.58 9216.29 81.74 319.71 3,439.66 6,199.42 N 4,176.52 W 6794.83 1.09 9312.14 81.77 319.71 3,453.41 6,271.77 N 4,237.86 W 6884.88 0.03 9408.04 81.83 320.74 3,467.09 6,344.72 N 4,298.59 W 6974.73 1.06 9504.17 81.80 321.02 3,480.77 6,418.54 N 4,358.63 W 7064.43 0.29 9599.66 81.51 321.13 3,494.63 6,492.04 N 4,417.99 W 7153.39 0.32 9695.47 81.25 320.50 3,508.99 6,565.47 N 4,477.84 W 7242.73 0.70 9791.17 81.31 320.57 3,523.50 6,638.50 N 4,537.96 W 7332.10 0.10 9887.48 80.95 320.33 3,538.35 6,711.87 N 4,598.55 W 7422.05 0.45 9982.71 81.51 320.65 3,552.87 6,784.48 N 4,658.43 W 7510.99 0.68 10078.90 81.19 321.15 3,567.34 6,858.28 N 4,718.41 W 7600.63 0.61 10174.79 81.24 321.14 3,581.98 6,932.08 N 4,777.86 W 7689.82 0.05 10270.32 81.64 320.09 3,596.20 7,005.09 N 4,837.80 W 7779.02 1.16 INSITE V8.0.0 Page 3Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10365.31 82.48 318.25 3,609.32 7,076.27 N 4,899.31 W 7868.61 2.11 10461.27 83.39 317.03 3,621.13 7,146.63 N 4,963.47 W 7960.04 1.58 10557.61 83.95 317.06 3,631.75 7,216.71 N 5,028.72 W 8052.24 0.58 10652.31 83.96 317.36 3,641.72 7,285.82 N 5,092.69 W 8142.85 0.32 10748.70 83.93 316.45 3,651.89 7,355.82 N 5,158.18 W 8235.22 0.94 10844.53 84.03 316.77 3,661.94 7,425.07 N 5,223.65 W 8327.18 0.35 10903.00 83.97 316.61 3,668.05 7,467.38 N 5,263.54 W 8383.27 0.29 10938.00 84.45 316.00 3,671.58 7,492.56 N 5,287.59 W 8416.92 2.21 10970.85 84.22 315.00 3,674.82 7,515.88 N 5,310.50 W 8448.63 3.11 11066.45 84.57 311.50 3,684.16 7,581.06 N 5,379.79 W 8541.73 3.66 11158.39 85.67 310.00 3,691.99 7,640.85 N 5,449.19 W 8632.11 2.02 11254.10 86.64 310.65 3,698.40 7,702.64 N 5,521.99 W 8726.45 1.22 11282.68 88.26 310.68 3,699.68 7,721.25 N 5,543.65 W 8754.63 5.67 11378.45 91.73 309.86 3,699.68 7,783.14 N 5,616.71 W 8849.24 3.72 11474.35 90.35 308.35 3,697.94 7,843.62 N 5,691.11 W 8944.25 2.13 11570.21 89.62 307.75 3,697.97 7,902.70 N 5,766.60 W 9039.46 0.99 11666.03 90.31 308.89 3,698.03 7,962.11 N 5,841.77 W 9134.58 1.39 11761.92 90.70 310.33 3,697.18 8,023.24 N 5,915.64 W 9229.48 1.56 11857.80 91.06 311.63 3,695.71 8,086.11 N 5,988.01 W 9324.01 1.41 11952.08 90.85 313.15 3,694.14 8,149.66 N 6,057.63 W 9416.55 1.63 12049.42 90.07 314.24 3,693.36 8,216.90 N 6,128.01 W 9511.65 1.38 12145.19 89.66 314.38 3,693.58 8,283.80 N 6,196.54 W 9605.00 0.45 12241.21 89.81 314.63 3,694.03 8,351.11 N 6,265.02 W 9698.52 0.30 12336.91 88.57 314.69 3,695.38 8,418.37 N 6,333.08 W 9791.66 1.30 12432.62 89.86 314.17 3,696.69 8,485.36 N 6,401.42 W 9884.89 1.45 12528.39 90.57 313.37 3,696.33 8,551.61 N 6,470.58 W 9978.44 1.12 12624.21 90.69 312.42 3,695.28 8,616.83 N 6,540.77 W 10072.33 1.00 12720.12 90.13 310.45 3,694.59 8,680.29 N 6,612.67 W 10166.76 2.14 12816.08 89.73 307.87 3,694.71 8,740.88 N 6,687.07 W 10261.83 2.72 12912.44 87.73 306.32 3,696.84 8,798.98 N 6,763.90 W 10357.69 2.63 13007.66 87.24 303.06 3,701.02 8,853.12 N 6,842.11 W 10452.65 3.46 13103.45 88.74 302.24 3,704.38 8,904.76 N 6,922.71 W 10548.35 1.78 13199.38 89.64 302.23 3,705.74 8,955.93 N 7,003.85 W 10644.26 0.94 13295.42 89.07 302.42 3,706.82 9,007.28 N 7,085.00 W 10740.28 0.63 13391.29 88.77 302.30 3,708.63 9,058.58 N 7,165.97 W 10836.12 0.34 13486.84 89.74 301.73 3,709.87 9,109.23 N 7,246.97 W 10931.65 1.18 13581.85 90.51 302.16 3,709.66 9,159.50 N 7,327.60 W 11026.66 0.93 13677.62 91.16 302.44 3,708.27 9,210.67 N 7,408.54 W 11122.41 0.74 13773.18 91.83 302.34 3,705.77 9,261.84 N 7,489.20 W 11217.92 0.71 13868.84 93.30 303.82 3,701.49 9,314.00 N 7,569.27 W 11313.44 2.18 13964.76 93.19 303.79 3,696.06 9,367.28 N 7,648.85 W 11409.12 0.12 14060.40 93.28 302.98 3,690.67 9,419.82 N 7,728.58 W 11504.55 0.85 14156.34 92.95 304.03 3,685.45 9,472.70 N 7,808.46 W 11600.28 1.15 14252.17 91.76 304.59 3,681.51 9,526.67 N 7,887.54 W 11695.90 1.37 14347.96 92.21 306.19 3,678.20 9,582.11 N 7,965.59 W 11791.40 1.73 INSITE V8.0.0 Page 4Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14443.54 91.52 306.88 3,675.09 9,638.98 N 8,042.34 W 11886.55 1.02 14539.30 91.73 306.14 3,672.37 9,695.93 N 8,119.28 W 11981.89 0.80 14635.07 91.76 305.29 3,669.45 9,751.81 N 8,197.00 W 12077.34 0.89 14731.04 91.53 304.94 3,666.70 9,806.99 N 8,275.47 W 12173.07 0.44 14827.04 91.21 303.00 3,664.40 9,860.61 N 8,355.06 W 12268.94 2.05 14921.95 91.25 302.84 3,662.37 9,912.18 N 8,434.71 W 12363.79 0.17 15017.78 92.68 302.90 3,659.08 9,964.16 N 8,515.15 W 12459.53 1.49 15113.61 91.98 302.74 3,655.18 10,016.06 N 8,595.62 W 12555.25 0.75 15208.89 91.75 302.68 3,652.08 10,067.52 N 8,675.74 W 12650.46 0.25 15304.97 88.34 302.63 3,652.01 10,119.35 N 8,756.63 W 12746.50 3.55 15400.81 87.74 299.97 3,655.29 10,169.11 N 8,838.46 W 12842.28 2.84 15496.74 86.31 298.19 3,660.27 10,215.67 N 8,922.18 W 12937.99 2.38 15591.96 85.78 298.20 3,666.83 10,260.55 N 9,005.90 W 13032.84 0.56 15687.71 89.29 297.87 3,670.95 10,305.51 N 9,090.32 W 13128.32 3.68 15783.57 90.78 296.50 3,670.89 10,349.30 N 9,175.59 W 13223.91 2.11 15879.48 91.35 295.46 3,669.11 10,391.31 N 9,261.79 W 13319.38 1.24 15975.27 89.36 290.63 3,668.52 10,428.79 N 9,349.91 W 13414.12 5.45 16071.23 90.62 290.91 3,668.53 10,462.82 N 9,439.63 W 13508.43 1.35 16166.51 91.73 291.78 3,666.58 10,497.49 N 9,528.35 W 13602.22 1.48 16262.39 93.22 293.75 3,662.44 10,534.55 N 9,616.67 W 13696.92 2.57 16358.16 93.28 295.05 3,657.01 10,574.05 N 9,703.75 W 13791.82 1.36 16453.42 92.91 293.73 3,651.87 10,613.33 N 9,790.38 W 13886.23 1.44 16548.62 92.12 295.25 3,647.69 10,652.75 N 9,876.93 W 13980.64 1.80 16644.33 91.87 296.05 3,644.36 10,694.16 N 9,963.15 W 14075.81 0.88 16739.85 90.22 294.88 3,642.61 10,735.22 N 10,049.37 W 14170.80 2.12 16836.04 90.20 294.34 3,642.26 10,775.27 N 10,136.82 W 14266.31 0.56 16931.84 91.04 290.76 3,641.22 10,812.00 N 10,225.28 W 14360.95 3.84 17027.63 92.36 292.47 3,638.38 10,847.27 N 10,314.29 W 14455.30 2.25 17123.10 93.76 293.71 3,633.29 10,884.66 N 10,401.98 W 14549.63 1.96 17218.96 92.11 293.79 3,628.38 10,923.21 N 10,489.61 W 14644.51 1.72 17314.49 91.85 296.12 3,625.08 10,963.49 N 10,576.16 W 14739.37 2.45 17409.86 92.84 294.40 3,621.17 11,004.15 N 10,662.33 W 14834.11 2.08 17506.22 91.66 291.78 3,617.39 11,041.91 N 10,750.90 W 14929.37 2.98 17602.01 91.82 291.75 3,614.48 11,077.41 N 10,839.82 W 15023.77 0.17 17697.76 91.94 294.59 3,611.34 11,115.06 N 10,927.79 W 15118.47 2.97 17793.52 92.61 293.66 3,607.54 11,154.17 N 11,015.11 W 15213.38 1.20 17889.43 90.92 295.02 3,604.58 11,193.68 N 11,102.45 W 15308.52 2.26 17985.27 88.76 292.47 3,604.85 11,232.26 N 11,190.17 W 15403.49 3.49 18081.14 87.79 290.50 3,607.74 11,267.36 N 11,279.33 W 15497.88 2.29 18176.94 88.84 287.91 3,610.56 11,298.86 N 11,369.75 W 15591.47 2.92 18272.80 89.66 291.20 3,611.81 11,330.93 N 11,460.06 W 15685.26 3.54 18367.17 90.67 291.00 3,611.54 11,364.91 N 11,548.10 W 15778.11 1.09 18463.52 91.36 288.94 3,609.83 11,397.80 N 11,638.64 W 15872.53 2.25 18559.09 91.67 289.77 3,607.31 11,429.47 N 11,728.77 W 15965.96 0.93 18654.49 91.68 291.90 3,604.52 11,463.38 N 11,817.89 W 16059.70 2.23 INSITE V8.0.0 Page 5Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 18750.23 91.08 291.56 3,602.21 11,498.82 N 11,906.80 W 16154.05 0.72 18845.83 91.51 291.27 3,600.05 11,533.71 N 11,995.78 W 16248.18 0.54 18940.92 90.71 289.98 3,598.21 11,567.20 N 12,084.75 W 16341.57 1.60 19036.85 90.65 290.97 3,597.07 11,600.76 N 12,174.62 W 16435.76 1.03 19078.83 90.54 289.09 3,596.63 11,615.13 N 12,214.05 W 16476.91 4.49 19145.00 90.54 289.09 3,596.01 11,636.77 N 12,276.58 W 16541.55 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 301.40 degrees (True) - A total correction of 19.61 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 19,145.00 feet is 16,915.35 feet along 313.47 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.0 Page 6Job No:AK-XX-0900918317 Well Name:OP10-09L1 Survey Report