Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-182 Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Nabors 245 Date: March 15, 2014 Surface Data Logging End of Well Report OP03-P05L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. Formation Tops 5. Mud Record 6. Bit Record 7. Morning Reports 8. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Nabors 245 Well: OP03-P05L1 Field: Nikaitchuq Project Borough: North Slope Borough State: Alaska Country: United States API Number: 50-029-23396-60-00 Sperry Job Number: AK-XX-0901109264 Job Start Date: 08 February 2014 Spud Date: 08 February 2014 Total Depth: 12391’ MD, 3934’ TVD North Reference: True Declination: 19.482° Dip Angle: 81.024° Total Field Strength: 57625.165 nT Date Of Magnetic Data: 13 February 2014 Wellhead Coordinates N: North 70° 30' 39.892" Wellhead Coordinates W: West 149° 51' 46.669" Drill Floor Elevation 53.30’ Ground Elevation: 12.20’ Permanent Datum: Mean Sea Level SDL Engineers: Charles Sinn, Josiah Failing, Leif Hammes, Jacob Hansen SDL Sample Catchers: N/A Company Geologist: Andrew Buchanan Company Representatives: Bruce Simonson / Ben Perry SSDS Unit Number: 121 DAILY SUMMARY 02/08/2014 SDL continues on location from previous well. Move rig onto new well. Rig up to kill well. Attempt to kill well with 8.5 ppg brine. Bullhead 80 bbls down 4.5" tubing, bullhead 310 bbls down annulus. Shutdown and monitor well while bleeding off annulus pressure. 02/09/2014 Continue to kill well, weight up from 8.5 ppg to 8.6 ppg. Bullhead 310 bbls 8.6 ppg down annulus. Nipple down the tree and nipple up the BOPs. Pick up testing tools. PSI test the BOP. 02/10/2014 BOP test failed, change Upper Ram Blocks on BOP, and finish BOP test. Rig up tools to pull 4.5” tubing. Pull and lay down tubing. 02/11/2014 Continue to trip out 4.5” production tubing to surface. Clean and clear rig floor. Lay down ESP equipment and remove pump components. Prep for cleanout run, and pick up cleanout BHA. 02/12/2014 Pick up and trip in Scraper with 5” DP to 5740’ MD. Trip out to surface and lay down scraper while adding 10 bbls/hr. Clean and clear rig floor, and proceed to pick up Packer and 30 joints of 5” DP. Trip in packer to 5142’ MD’ 02/13/2014 Circulate and set Packer at 5716’ MD, continue to circulate until Brine returned. Trip out to surface and lay down Packer BHA. Run E-line F/Cement logging operation from 7505’ MD to 4385’ MD. Pull out and rig down E-line. Pick up whipstock assembly. 02/14/2014 Trip in Whipstock to 5716’ MD while preforming shallow hole test at 2653’ MD. Begin milling operation with the top of the window at 5626’ MD and the bottom of the window at 5643’ MD. Drill Rat Hole to 5663’ MD and clean window while pumping a fiber sweep. Pump dry job and trip out to surface. Gas: There was a Max Gas of 11 units from 5656' MD with an Average Gas of 10 units 02/15/2014 Lay down Milling BHA. Drain BOP stack and cycle Rams. Pick up Mud Motor BHA, and trip in while preforming a shallow hole test at 2014’MD. Break circ pump, then circulate and condition mud. Preform FIT test, orientate tool face, tag bottom at 5664’ MD, and proceed to drill ahead to 5780’ MD. Gas: There was a Max Gas of 28 units from 5719' MD with an Average Gas of 20 units 02/16/2014 Continue Drilling ahead to 5899’ MD. Completed Build section; pumped 1 bottoms up, then a Dry Job. Tripped out to surface and lay down BHA. Pick up test tools and test BOPs. Gas: There was a Max Gas of 116 units from 5842' MD with an Average Gas of 36 units 02/17/2014 Continue to test BOP’s. Lay down the test tools, install wear bushing, pick up drilling BHA. Trip in to hole, while preforming shallow hole test at 2662’ MD. Tag bottom at 5572’ MD. Circulate and wash to 5600’ MD. Attempt to reenter window, fight it to 5763’ MD. Pull back to 5722’ MD. Gas: There was a Max Gas of 54 units while tripping. 02/18/2014 Back ream to 5518’ MD, start to rotate and ream in to 5725’ MD. Pull back to casing at 5613’MD, and pull out of hole because of pack off. Pump swab sweep at 4840’ and trip out to surface. Lay down Xceed BHA and pick up mud motor BHA. Trip in to 5836’ MD while preforming shallow hole test at 1668’MD. Gas: There was a Max Gas of 60 units while tripping. 02/19/2014 Wash and ream down to 5900’MD. Back ream to 5672’MD. Circulate 4 bottoms up, and preform FIT test. Drill ahead sliding and rotating to 6151’ MD. Back ream to 5574’ MD. Slip and cut then run in with 5” DP. No problems, trip out on elevators. Gas: There was a Max Gas of 44 units while reaming. 02/20/2014 Continue to trip out to surface. Lay down BHA#3 and pick up Xceed BHA#4. Trip into 5126’ while performing shallow hole test at 2653’MD. Wash and ream to 6151’MD. Drill ahead to 6400’MD Gas: There was a Max Gas of 666 units from 6194' MD with an Average Gas of 344 units 02/21/2014 Drill ahead from 6400’MD to 8094’MD. Gas: There was a Max Gas of 1135 units from 7545' MD with an Average Gas of 489 units 02/22/2014 Drill ahead from 8094’MD to 9817’MD. Gas: There was a Max Gas of 1711 units from 9420' MD with an Average Gas of 549 units 02/23/2014 Drill ahead from 8917’MD to 11255’MD. Gas: There was a Max Gas of 1253 units from 9944' MD with an Average Gas of 574 units 02/24/2014 Drill ahead from 11255’ MD to 11373’MD. Communications with MWD tool lost, back ream to 9530’ MD. Circulate 3 bottoms up, service rig. Regain communication with MWD tools; wash in to 11373’MD. Drill to 11347’MD, lose communication with tool again. Back ream out of the hole to 7902’ MD. Gas: There was a Max Gas of 964 units from 11255’' MD with an Average Gas of 629 units 02/25/2014 Continue to back ream out to the window at 5892’MD. Monitor ECD and pump pressure through the shale formation. Pull out of hole on elevators to surface. Laydown BHA#4 and pickup BHA#5, rerun bit #4, while changing out MWD tools. Trip in to 1695’ MD and preform shallow hole test. Gas: There was a Max Gas of 97 units while reaming 02/26/2014 Continue to trip in to 11250’MD. Drill ahead to 12391’ MD. Begin to back ream out. Gas: There was a Max Gas of 939 units from 12238’' MD with an Average Gas of 628 units 02/27/2014 Circulate 3 bottoms up, and back ream out to 5201’ MD. Wash BHA through window. Trip out on elevators to surface. Lay down BHA#5. Gas: There was a Max Gas of 110 units while reaming 02/28/2014 Continue to lay down BHA #5. Slip and cut. Make up whipstock retrieval BHA. Trip in and tag whipstock at 5630’ MD. Retrieve, trip to surface, and lay down BHA. Rig up casing tools. 03/01/2014 Begin to run 5.5” slotted liner to 2469’ MD. Trouble shoot skate and service rig. Run through window at 5626’ MD. Encounter obstruction @ 5912’MD. Work liner with no success, trip back to 2498’MD. 03/02/2014 Continue to trip liner out to surface. Test BOP’s. Rig down testing equipment and pick up clean out BHA. Gas: No trip gas observed. 03/03/2014 Continue to pick up clean out BHA. Trip in to 5635’MD. Work through tight spot from 5636 to 5718’MD Orientate and attempt to enter window. Bring mud weight to 9.1 ppg. Pull out to 181’MD, rearrange tools on clean out BHA and trip in to 5620’MD. Work tight spot from 5620’MD to 5718’ MD to clean window. Gas: There was a Max Gas of 129 units while reaming 03/04/2014 Attempt to run through window unsuccessful. Trip out to surface. Lay down and reconfigure BHA. Trip in to 5635’MD. Work tight spot to 5718’MD. Circulate at 6235’MD and trip to surface. Lay down BHA, and pick up new BHA with 5.5” bent joint. Trip to window and work pipe from 5620’ MD to 5718’ MD. Gas: There was a Max Gas of 9 units while reaming 03/05/2014 Work pipe through window - successful. Encounter tight spot @ 5780'. Work pipe from 5660' MD to 5907' MD. Pull back into casing @ 5618'. Run through window again to establish open window. Run in hole to 5718' MD at packer. Circulate to top of packer for brine pill. Spot 30 bbl brine pill. Trip out of hole to 1975' MD. Continue trip out of hole. Gas: There was a Max trip gas of 45 units 03/06/2014 Trip out of hole with 5" drill pipe from 1975' MD to surface. Lay down BHA. Perform rig service. Slip and cut 59' line. Pick up milling BHA. Pick up and rack back 3 stands 5" HWDP. Pick up third party tools. Pick up whipstock assembly and make up milling/whipstock BHA. Trip in hole with 5" drill pipe from 452' MD to 5531' MD. Currently orientating and setting whipstock. Gas: There was a Max trip gas of 12 units 03/07/2014 Finish milling / polishing window area from 5626' MD to 5643' MD. Trip out of hole with 5" DP from 5905' MD to surface. Lay down whipstock and BHA. Clean / clear rig floor. Rig service. Stage exceed directional BHA. Pick up BHA. Trip in hole from 271' MD to 1695' MD. Change out tools / elevators. Perform shallow hole test. Trip in hole from 1695' MD to 5120' MD. Work through windows. Surveys every 30' from 5636' MD to 5917' MD. Trip in hole to 6176' MD. Trip in hole. Gas: There was a Max Gas of 10 units 03/08/2014 Wash / ream from 6176' MD to 12391' MD. Circulate and condition the hole. Back ream out of hole at 400 gpm and 120 rpm from 12391' MD to 11060' MD. Trip out of hole through window at 100 gpm and not rotation. Trip out of hole through window. Gas: There was a Max trip gas of 685 units 03/09/2014 Work through tight spot from 5700' MD to 5620' MD. Trip in hole from 5620' MD to 6269' MD. Back ream out of hole from 6269' MD to 5620' MD. Pump dry pill. Trip out of hole from 5620' MD to surface. Lay down BHA. Clean / clear rig floor. Pick up whipstock retrieval BHA. Trip in hole from 2263' MD. Circulate / condition hole. Perform shallow hole test. Trip in hole to 5619' MD. Retrieve whipstock assembly. Pump out of hole from 5619' MD to 4370' MD. Gas: There was a Max trip gas of 24 units 03/10/2014 Trip out of hole from 1884' MD to surface and lay down BHA. Pick up whipstock retrieval BHA. Trip in hole to 5624' MD. Tag whipstock at 5624' MD. Jar whipstock free. Trip out of hole from 5601' MD to 163' MD. Lay down whipstock retrieval BHA. Pull whipstock through floor, found safety disconnect was missing. Clean / clear rig floor. Slip / cut 48' drill line. Pick up fishing BHA. Trip in hole to 5557' MD. Tag fish at 5592' MD. Catch fish and jar free. Trip out of hole. 03/11/2014 Trip out of hole with 5" DP from 5584' MD to surface. Lay down BHA. Clean / clear rig floor. Perform rig maintenance. Pick up milling BHA. Trip in hole with 4.5" DP from 198' MD to 5525' MD. Trip in hole with 5" DP from 5525' MD to 5625' MD. Ream window area from 5624' MD to 5656' MD. Trip out of hole with 5" DP and rack back. Trip out of hole with 4.5" DP. Lay down 4.5" DP. 03/12/2014 Lay down 4.5” drill pipe from 3149’ MD to surface. Lay down BHA. Service the rig. Pick up tools for 5.5” liner run. Run in hole with 5.5” liner from surface to 1400’ MD. Repair pipe skate. Run in hole from 1400’ MD to 2170’ MD. Change out swell packers that were already down hole per CoMan. Run in hole from 2170’ MD to 4467’ MD. Run in hole liner. 03/13/2014 Run in hole with 5.5" liner. Land liner at 5461' MD and liner shoe at 12385' MD.Displace from FazePro to 8.7 ppg KCL brine at 9 bpm. Pump 50 bbls high viscosity citric acid spacer. Displace hole with 379 bbls brine. Observe clean brine back to surface. 520 bbls FazePro sent back to reserve storage. Trip out of hole. Gas: Maximum gas while displacing 9 units 03/14/2014 Trip out of hole and lay down 5" drill pipe from 5140' MD to surface. Rig up for 4.5" tubing run. Make up pump and motor assemblies. Hook up ESP cable. Rig up 4.5" cable. Gas: No significant gas 03/15/2014 Complete rig up for 4.5" tubing run. Pull ESP cable through shiv and splice. Run in hole with 4.5" tubing to 5313' MD. Lay down 4.5" tubing tools from floor. Pick up landing joints and hanger. Cut and splice ESP cable. Prepare to land 4.5" tubing. Gas: No significant gas 03/16/2014 Land 4.5” tubing. Rig down. Release rig for move. Gas: No significant gas 5000 6000 7000 8000 9000 10000 11000 12000 13000 0 5 10 15 20 25 30 35 40 Me a s u r e d D e p t h Rig Days Prognosed Actual WELL NAME: OP03-P05L1 OPERATOR: Eni Petroleum MUD CO: MI Swaco RIG: Nabors 245 SPERRY JOB: AK-XX-0901109264 Days vs. Depth 06 February 2014 SDL Services On Location from Previous Well LOCATION: Oliktok Point AREA: Nikaitchuq Field STATE: Alaska SPUD: 8-Feb-2014 TD: 26-Feb-2014 Commenced 8.5" Lateral Hole Section On Bot: 10:00 14 Feb 2014 Problem landing liner Conduct clean out runs to reslove issue POOH for MWD tool Failure 24 Feb 2014 TD Lateral Hole Section 12391' MD, 3934' TVD Off Bot: 23:30 26 Feb 2014 Landed 5.5" Liner 12385' MD, 3934' TVD 13 Mar2014 WELL NAME:OP03-P05L1 LOCATION:Oliktok Point OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO:MI Swaco STATE:Alaska RIG:Nabors 245 SPUD:8-Feb-2014 SPERRY JOB:AK-XX-0901109264 TD:26-Feb-2014 Marker MD INC AZ TVD TVDSS Schraeder Bluff 5,167.0 67.3 11.2 3,440.5 -3,387.3 N Sand Top 5,384.5 66.2 9.7 3,524.4 -3,471.2 N sbl 2 5,422.5 67.5 8.8 3,539.4 -3,486.2 N sbl 3 5,475.5 69.5 7.8 3,539.4 -3,505.5 N Sand Base 5,527.5 70.7 5.8 3,576.4 -3,523.2 OA-Sand Top 6,052.0 86.9 357.3 3,687.9 -3,634.6 OA-2 7,325.0 85.5 356.4 3,734.3 -3,681.0 OA-3 7,578.0 84.2 3.3 3,758.7 -3,705.4 Fault 1 7,728.0 86.1 6.2 3,770.3 -3,717.0 OA-Sand Top 8,108.0 83.0 4.6 3,825.6 -3,772.3 OA-Sand Top 8,611.0 92.9 4.3 3,832.1 -3,778.8 OA-Sand Top 8,782.0 87.3 0.8 3,831.0 -3,777.7 OA-2 9,449.0 86.6 354.9 3,844.7 -3,791.4 OA-3 9,625.0 86.4 0.1 3,855.7 -3,802.4 OA-3 10,139.0 92.6 358.3 3,866.3 -3,813.0 OA-2 10,314.0 90.2 357.9 3,863.0 -3,809.7 OA-2 10,925.0 88.2 0.5 3,881.3 -3,828.0 OA-2 11,019.0 86.8 359.8 3,885.4 -3,832.1 Formation Tops OP03-P05L1 Oliktok Point Eni Petroleum Nikaitchuq Field MI Swaco Alaska Nabors 245 AK-XX-0901109264 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/R 6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab CaCl2 Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb 2/15/2014 5664 8.7 52 14 20 8/8/9 6.2 48/34/28/22/9/8 NA/1 6.88 70 1.6 2.08 603 -Drill 8.5" Hole L1 2/16/2014 5900 8.7 50 13 21 7/7/8 6.4 45/32/26/20/9/8 NA/1 6.69 64 1.6 2.08 550 -Drill 8.5" Hole L1 2/17/2014 5900 8.7 48 13 18 7/7/9 6.6 44/31/25/20/9/8 NA/1 6.82 64 1.5 1.95 529 -Drill 8.5" Hole L1 2/18/2014 5900 8.9 49 14 19 8/8/9 NA 47/33/28/22/9/8 NA/1 7.8 64 1.6 2.08 630 -Drill 8.5" Hole L1 2/19/2014 6151 8.95 47 13 18 7/7/8 6.9 44/31/25/19/9/8 NA/1 8.8 71 1.7 2.21 540 -Drill 8.5" Hole L1 2/20/2014 6184 8.95 47 14 16 7/7/8 6.6 44/30/25/19/8/7 NA/1 8.8 71 1.8 2.34 530 -Drill 8.5" Hole L1 2/21/2014 7852 9 45 13 16 6/6/7 6.2 42/29/23/17/7/6 NA/1 8.8 71 2.3 2.99 480 -Drill 8.5" Hole L1 2/22/2014 9631 8.95 45 13 16 6/7/7 6.4 42/29/23/17/7/6 NA/1 8.89 71 2.3 2.99 392 -Drill 8.5" Hole L1 2/23/2014 11046 8.9 45 13 15 6/6/7 6.2 41/28/22/16/7/6 NA/1 8.83 71 2 2.6 455 -Drill 8.5" Hole L1 2/24/2014 11437 8.9 45 14 13 6/6/7 N/A 41/27/22/16/7/6 NA/1 8.71 65 2.3 2.99 450 -Drill 8.5" Hole L1 2/25/2014 11437 8.9 45 13 14 6/6/7 N/A 40/27/21/15/7/6 NA/1 8.8 65 2.1 2.73 450 -Drill 8.5" Hole L1 2/26/2014 12190 8.9 45 14 15 6/7/8 6.0 43/29/24/18/8/7 NA/1 8.85 66 2.50 3.25 450 -Drill 8.5" Hole L1 2/27/2014 12391 8.9 45 13 15 6/6/7 6.0 41/28/22/17/7/6 NA/1 10 66 2.50 3.25 475 -Drill 8.5" Hole L1 2/28/2014 12391 8.9 45 13 14 6/6/7 NA 40/27/21/16/7/6 NA/1 8.9 66 2.20 2.86 485 -Rig up Volant tool 3/1/2014 12391 8.9 45 14 12 6/6/7 NA 40/26/21/16/7/6 NA/1 8.9 66 2.10 2.73 489 -POOH with 5.5" Liner 3/2/2014 12391 9.10 45 14 14 5/6/6 5.9 42/28/22/17/7/6 NA/1 9.9 73.0 1.90 2.47 475.0 -Pick up Cleanout BHA 3/3/2014 12391 9.10 47 15 14 6/6/7 5.8 44/29/24/19/8/7 NA/1 9.9 65.0 2.00 2.60 454.0 -Trip out of hole Cleanout BHA 3/4/2014 12391 9.10 48 12 12 5/6/6 6.5 36/24/19/13/6/5 1 11 74 2.40 3.12 543 -Work pipe at window 3/5/2014 12391 9.25 52 13 15 7/7/8 5.5 41/28/23/17/7/6 1 8.7 68.0 2.00 2.60 600 -Trip out of hole for whipstock 3/6/2014 12391 9.15 53 13 13 6/7/7 5.4 39/26/21/16/7/6 1 9.7 75.0 2.50 3.25 580 -Setting whipstock 3/7/2014 12391 9.30 52 14 16 7/7/8 5.6 44/30/24/18/7/6 1 9.8 73.0 2.20 2.86 605 -Trip in hole with Directional BHA 3/8/2014 12391 9.30 52 14 18 7/7/8 6.2 46/32/25/18/7/6 1 11.0 66.0 2.10 2.73 506 -Back ream out of hole to window 3/9/2014 12391 9.40 54 15 18 8/8/9 6.4 48/33/26/19/8/7 1 9.8 65.0 2.15 2.80 540 -Trip out of hole with whipstock 3/10/2014 12391 9.35 55 15 18 8/8/9 7.4 48/33/27/20/8/7 2 10.7 64.0 2.40 3.12 575 -Trip out of hole with whipstock 3/11/2014 12391 9.35 56 16 17 8/8/9 7.6 49/33/28/21/8/7 2 10.7 64.0 2.30 2.99 530 -Trip out of hole with mill assembly 3/12/2014 12391 9.35 53 14 16 7/7/8 1.8 44/30/24/18/7/6 2 12.0 65.0 2.40 3.12 520 -Run 5.5" Liner 3/13/2014 12391 8.80 27 ------------Trip out of hole post displacement Casing Record SPERRY JOB:TD: 8-Feb-2014 26-Feb-2014 20" Conductor @ 160' MD, 160'TVD 9.625" Casing BOW @ 5643' MD, 3612'TVD 5" Liner @ 12385' MD, 3934'TVD WELL NAME:LOCATION: OPERATOR:AREA: MUD CO:STATE: RIG:SPUD: W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 1 400 1 Milled Tooth XR+8.50 5664 5899 236 4.90 1.400 48.4 15 60 1550 450 1-2-WT-A-E-I-NO-BHA Mill Window 3 700 1 RR Milled Tooth XR+8.50 5899 6051 251 3.00 1.400 83.9 25 80 1900 520 1-2-WT-A-E-I-NO-BHA Complete Build Section 4 800 2 MDSi616 8.50 6051 11437 5438 42.00 0.902 129.5 4 130 2300 500 0-1-CT-S-X-I-NO-DFT POOH for MWD tool failure 5 900 2 RR MDSi616 8.50 11437 12391 953 7.30 0.902 131.4 4 120 2125 500 1-1-CT-A-X-I-NO-TD TD Lateral Section WELL NAME:OP03-P05L1 LOCATION:Oliktok Point OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO: SPERRY JOB:AK-XX-0901109264 TD:26-Feb-2014 MI Swaco STATE:Alaska RIG:Nabors 245 SPUD:8-Feb-2014 B i t R e c o r d . . * 24 hr Recap:Move rig onto new well. Rig up to kill well. Attempt to kill well with 8.5 ppg brine. Bullhead 80 bbls down 4.5" tubing Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 49500.00 0 8-Feb-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 1 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.70 Size No gas readings off pressure per CoMan. Currently bleeding off annulus pressure. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901109264 Kill well PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: Bullhead 310 bbls down annulus. Shutdown and monitor well. Tubing psi at 0, annular psi at 238. Opened annulus to bleed in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Hansen Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap:Continue to kill well. Weight up from 8.5 ppg to 8.6 ppg. Bullhead 310 bbls 8.6 ppg down annulus. Weight up from Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 48000.00 0 9-Feb-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 2 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.80 Size No gas readings PSI testing BOP. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901109264 BOP Test PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: 8.6 ppg to 8.8 ppg. Pump 245 bbls 8.8 ppg. Nipple down tree / nipple up BOPs. Pick up testing tools. PSI test BOP. Currently in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Hansen Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Leif Hammes Maximum Report By:Logging Engineers:L. Hammes / J. Hansen 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: L/D tubbing while pumping 10bbls/hr. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-901109264 POOH w/ 4.5 in PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No gas readings ConditionBit # 8.80 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 3 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 10-Feb-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 46000.00 Continue PSI testing BOP; change Upper Ram Blocks in BOP; finish BOP test. R/U tools to pull 4.5" Tubing. Pull and Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Trip out 4.5" production tubing. Clear/clean 3rd party equipment and rig floor. M/U tools and BHA; L/D ESP Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 41000.00 0 11-Feb-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 4 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.80 Size No gas readings 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-901109264 P/U scraper PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: equipment. Remove Pump components. Load & strap 5" DP, Prep for clean out run. P/U clean out BHA. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 28 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Leif Hammes Maximum Report By:Logging Engineers:L. Hammes / J. Hansen Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Leif Hammes Maximum Report By:Logging Engineers:L. Hammes / J. Hansen 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 28 C-5nC-2 in Minimum Depth Time: clean rig floor. Pick up Packer BHA. Pick up 30 jts 5" DP from 67' to 1023' MD. Trip in from 1023' to 5142' MD. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-901109264 Trip in Packer PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No gas readings ConditionBit # 8.80 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 5 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 12-Feb-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 46000.00 Pick up Scraper BHA. Trip in Scraper w/ 5" DP to 5740' MD. TOOH adding 10 bbls/hr. L/D Scraper BHA, clear and Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Circulate and set Packer @ 5716'MD. Circulate until brine seen at surface 3750 strks @ 130g/min. Trip out Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 45000.00 0 13-Feb-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 6 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.80 Size No gas readings Clean and clear rig floor. Pick up whipstock assembly. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-901109264 P/U whipstock PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: from 5701' MD to surface. Run E-line F/Cement logging operation from 7505' MD to 4385' MD. Pull out and rig down E-line. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 28 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Leif Hammes Maximum Report By:Logging Engineers:L. Hammes / J. Hansen Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 965 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 0 Leif Hammes Maximum Report By:Logging Engineers:L. Hammes / J. Hansen 943 0 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 51 C-5n 5656' 0.0 C-2 11 in 0 5626'Minimum Depth Time: @ 5626' MD. Mill from 5629' MD to BOW @ 5643' MD. Drill rat hole to 5663' MD. Clean window, and pump fiber sweep. Pump 10 - 5563' 20' Max @ ft Current 5654'2.0 Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 4.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 14 Footage Ss (ppb Eq) C-1 C-5i AK-AM-901109264 P/U whipstock PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 FazePro 22 Depth in / out Mud Type Lst Type Average NA1Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB Casing 100% Gas In Air=10,000 UnitsConnection 0 There was a Max Gas of 11 units from 5656' MD with an Average Gas of 10 units dry job, and trip out from 5663' MD to surface. 5660' ConditionBit # 8.708.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 7 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 14-Feb-2014 12:00 AM Current Pump & Flow Data: 0 Max 0 Chlorides mg/l 37000.00 P/U Whipstock BHA. TIH from 646' MD to 5716' MD w/ shallow hole test @ 2653' MD. Start milling operation, TOW Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr. Recap: (max)(current) 7 0 Cly 4023 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 0 Leif Hammes Maximum Report By:Logging Engineers:L. Hammes / J. Hansen 2001 894 457 108 Units* Casing Summary Lithology (%) 0 MBT 5780' pH 1.400 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 52 C-5n 5719' 38.0 C-2 28 in 11 5695'Minimum Depth Time: hole test @ 2014' MD. Trip in to 5595' Md. Break circ pump, circulate and condition mud. Perform FIT test hold for 10 min. 20 5664' 5780' 116' Max @ ft Current 5663'49.0 Date: Avg to5664' Yesterday's Depth: Current Depth: 24 Hour Progress: 69.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 14 116' Footage 2.30 Ss (ppb Eq) C-1 C-5i AK-AM-901109264 P/U whipstock PV 24 hr Max Weight 2 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 58.0 FazePro 20 Depth in / out Mud Type Lst Type Average NA24Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools TeleScope 675 API FL Chromatograph (ppm) 5.05664' WOB Casing 100% Gas In Air=10,000 UnitsNAConnection 0 There was a Max Gas of 28 units from 5719' MD with an Average Gas of 20 units Orientate tool face, tag bottom at 5664' MD, and drill ahead to 5780' MD. 5660' ConditionBit # 1 8.5" 8.75 Milled Tooth Bit Milled Tooth Bit 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 8 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 15-Feb-2014 12:00 AM Current Pump & Flow Data: 1505 Max 0 Chlorides mg/l 35000.00 Lay down Milling BHA. Drain BOP stack and cycle Rams. Pick up Mud Motor BHA. Trip in and preforming shallow Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr. Recap:Continue to drill to 5899' MD. Pump 1 Bottoms Up; them pump Dry Job. Trip out to surface and lay down BHA.. Clean Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 36000.00 3 16-Feb-2014 12:00 AM Current Pump & Flow Data: 0 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 9 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 1 8.5" Milled Tooth Bit Milled Tooth Bit 8.70 Size There was a Max Gas of 116 units from 5842' MD with an Average Gas of 36 units 5660' 100% Gas In Air=10,000 UnitsNAConnection 15 Tools TeleScope 675 API FL Chromatograph (ppm) 0.05664'5899' WOB Casing Avg Min Comments RPM ECD (ppg) ml/30min 0Background (max) Trip Average NA Mud Type Lst Type 0.0 FazePro 19 Depth in / out YP (lb/100ft2) 021 00 CementChtSilt C-4i C-4n 24 hr Max Weight 14 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-901109264 Test BOP PV 235' Footage 6.70 Simonson / Sherman ShClyst TuffGvlCoal cP 13 Gas Summary 0 8 6 (current) Avg to5780' Yesterday's Depth: Current Depth: 24 Hour Progress: 68.0 Flow In (gpm) Flow In (spm) 5780' 5899' 119' Max @ ft Current 5792'53.0 Date: Time: and clear rig floor, then P/U test tool and test BOPs. 36 in 7 5886'Minimum Depth C-5n 5842' 0.0 C-2 116' SPP (psi) Gallons/stroke TFABit Type Depth 47 MBT 5799' pH 1.400 4 0 0 Siltst 0 0 Units* Casing Summary Lithology (%) 14524 4492 907-685-1490Unit Phone: 0 Leif Hammes Maximum Report By:Logging Engineers:L. Hammes / J. Hansen Set AtSize 40.0 Grade 9.63'' (max)(current) 62 15 Cly 15684 . . * 24 hr. Recap: (max)(current) 0 0 Cly 0 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 0 Leif Hammes Maximum Report By:Logging Engineers:L. Hammes / J. Failing 0 0 520 123 Units* Casing Summary Lithology (%) 0 MBT 5899' pH 0.902 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 48 C-5n 0' 0.0 C-2 0 in 0 0'Minimum Depth Time: while preforming shallow hole test at 2652' MD. Tag at 5572' MD Circulate and wash to 5600'MD Attempt to re-enter window, fight it 5 5899' 5899' 0' Max @ ft Current 0.0 Date: Avg to5899' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 13 0' Footage 0.00 Ss (ppb Eq) C-1 C-5i AK-AM-901109264 Enter Window PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 0.0 FazePro 18 Depth in / out Mud Type Lst Type Average 548Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools TeleScope 675 API FL Chromatograph (ppm) 0.05899'0' WOB Casing 100% Gas In Air=10,000 UnitsNAConnection 0 There was a Max Gas of 54 units while tripping into the hole with an Average Gas of 5 units to 5763' MD. Pull back to 5722'MD. 5660' ConditionBit # 2 8.5" 8.75 MDSi616 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 10 Customer: Well: Area: Location: Rig: OP03-P05 L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 17-Feb-2014 12:00 AM Current Pump & Flow Data: 1813 Max 0 Chlorides mg/l 33000.00 Continue to test BOPs. Lay down test tools, install wear bushing, pick up drilling BHA. Trip into hole Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Report By: 9 5/8" Logging Engineers:Failing / Hammes (max)(current) Cly Depth in / outBit Type RPM -- - Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Simonson / Sherman AK-AM-901109264 Wash down hole 0.902 ---- 907-685-1490Unit Phone: 0 J. Failing Set AtSize 47#L-80 Grade 0 C-2 Gas Summary 2 8.5"MDSi616 0 0 0 0 0 0 0 0 Minimum Depth Maximum in 0 0 0 Begin to pack off. Reduce pump rates, weight up OBM. POOH. Swabbing @ 4840'. Circ BU. Continue POOH. L/D BHA. Max trip gas 60 units. Alkal Coal Gallons/stroke 0 5900' 5900' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) Max @ ft Date: Time: API FL Depth 5899' Avg to5899' Current (current) Units* ClystSs Cht Silt Casing Summary Lithology (%) 1.400 1449 - Footage PV cP Weight Flow In (gpm) Flow In (spm) Oil / Water Hours 0 Cement C-1 C-5i ShSiltst Chromatograph (ppm) 0 0 00 C-4i C-4n 0 Lst (lb/100ft2) 8.90 Type 19 Mud (lb/bbl)ml/30min 2.081.60 - C-3 Average 60Trip (max) 0 Comments 45Background P/U mud motor BHA. RIH t/ 1668'. Perform Shallow hole test. RIH t/ 5576. Wash/ease through window - no problems. Wash 100% Gas In Air=10,000 UnitsConnection down t/ 5863'. Bit # 3 8.5"- - - Size TOW 5626'BOW 5643'Hydril 563 - WOB Milled Tooth XR+ TFA Condition - MWD Summary 96% %Mud Type FazePro N/A Ratio Mud Data Depth 70-30 4.23 @ Current Pump & Flow Data: Report For: 5900'7.8 Cor Solids Avg Min YP MaxECD (ppg) Tools XP Motor 1.5; Telescope 675 Job No.: Daily Charges: Total Charges: Rig Activity: Morning Report Report # 11 Customer: Well: Area: Location: Rig: 18-Feb-2014 12:00 AM ROP ROP (ft/hr) 24 hr Max BROOH t/ 5618' MD. RIH t/ 5709'. Start rotating, continue reaming f/ 5793' t/ 5725'. Pull into casing @ 5613'. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity Wash down t/ 5900'. BROOH t/ 5672'. Circ 4 BU. Perform FIT. RIH t/ 5900'. Drill ahead sliding/rotating t/ 6151' MD. ROP ROP (ft/hr) 24 hr Max Morning Report Report # 12 Customer: Well: Area: Location: Rig: 19-Feb-2014 12:00 AM Job No.: Daily Charges: Total Charges: Rig Activity: 199.6 Cor Solids 9.49 Avg Min YP MaxECD (ppg) Tools XP Motor 1.5; Telescope 675 4.23 @ Current Pump & Flow Data: Report For: 5900'8.8 MWD Summary 96% %Mud Type FazePro N/A Ratio Mud Data Depth 71-29 6151' WOB Milled Tooth XR+ TFA Condition -8.5" 5900' - - Size TOW 5626'BOW 5643'Hydril 563 Max gas during reaming: 44 units 100% Gas In Air=10,000 Units-Connection Comments Background Trip (max) 12Average 44 Mud (lb/bbl)ml/30min 2.211.70 20.0 C-3 Lst (lb/100ft2) 8.95 Type 18 Bit # 03 C-4i C-4n 0 Chromatograph (ppm) 40 13 Oil / Water Hours 0 Cement C-1 C-5i Sh PV cP Weight Flow In (gpm) Flow In (spm) Casing Summary Lithology (%) 1.400 1347 251' Footage Siltst 3 (current) Units* ClystSs Cht Silt API FL Depth 5899' Avg to5899' Current 92.3- Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) Max @ ft 6059' Date: Time: 0 5900' 6151' 251' Lime TuffGvl C-5n Alkal Coal Gallons/stroke BROOH t/ 5574'. Slip and cut. Service Rig. RIH w/ 5" drill pipe t/ 6150' - no issues. BROOH t/ 4717'. TOOH on elevators. 34 3 5946' 0 7 475 5921'Minimum Depth Maximum in 0 3869 2 8.5"MDSi616 3 9 0 5 9309 0 47#L-80 Grade 576 C-2 Gas Summary --- 907-685-1490Unit Phone: 0 J. Failing Set AtSize Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / Sherman AK-AM-901109264 TOOH Depth in / outBit Type RPM -- 80.0 0.902 - Report By: 9 5/8" Logging Engineers:Failing / Hammes (max)(current) Cly . . * 24 hr Recap: Logging Engineers:Failing / Hammes (max)(current) Cly 6151' 80 - 1.400 251' Report By: Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / Sherman AK-AM-0901109264 Drill Ahead 907-685-1490Unit Phone: 40 J. Failing Set AtSize 9 5/8" 12 C-2 Gas Summary 3 8.5"Milled Tooth XR+ 83 142 0 134 85637 0 0 38229 666 6323'Minimum Depth Maximum in 7 6194' 0 147 74 RIH t/ 5126'. Wash/ream t/ 6151'. Drill ahead t/ 6400'. 344 524 Alkal Coal Gallons/stroke 0 6151' 6400' 249' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 124 SPP (psi) Max @ ft 6183' Date: Time: Depth 6400' Avg to6050' Current 156.2126.0 (current) Units* ClystSs Cht Silt Casing Summary Lithology (%) 0.902 1447 - Footage Siltst 4 Sh PV cP Weight Flow In (gpm) Flow In (spm) 47#L-80 Grade Oil / Water Hours 0 Cement C-1 C-5i Chromatograph (ppm) 478 234 2284 C-4i C-4n 42 Lst (lb/100ft2) 8.95 Type 16 Mud (lb/bbl)ml/30min 2.341.80 - RPM Average - (max) 263 Background Trip Comments 65 C-3 100% Gas In Air=10,000 Units-Connection 1-2-WT-A-E-I-NO-BHA - Size TOW 5626'BOW 5643'Hydril 563 3.00 255900' Depth in / out - WOB Smith MDSi616 TFA Condition -8.5"6151' Bit #Bit Type N/A Ratio Mud Data Depth 71-29 API FL Report For: 6400'8.8 9.64 10.07MWD Summary 96% % Total Charges: Rig Activity: 234.8 Cor Solids 9.91 Avg Min YP Max Morning Report Report # 13 Customer: Well: Area: Location: Rig: 20-Feb-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools 1820 ROP ROP (ft/hr) Xceed675, Periscope675, Telescope675, Neoscope 4.23 @ Current Pump & Flow Data: TOOH on elevators. L/D BHA #3. P/U and M/U Xceed BHA #4. RIH t/ 2653', perform shallow hole test - good. Density (ppg) out (sec/qt) Viscosity Mud Type FazePro . . * 24 hr Recap: Mud Type FazePro Drill ahead f/ 6400' t/ 8094' MD. 1810 ROP ROP (ft/hr) Xceed675, Periscope675, Telescope675, Neoscope 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 14 Customer: Well: Area: Location: Rig: 21-Feb-2014 12:00 AM Job No.: Daily Charges: Total Charges: Rig Activity: 242.8 Cor Solids 9.94 Avg Min YP Max Report For: 7852'8.8 9.13 10.42MWD Summary 96% %Ratio Mud Data Depth 71-29 API FLDensity (ppg) out (sec/qt) Viscosity - WOB Smith MDSi616 TFA Condition -8.5" 6151' Bit #Bit Type 1-2-WT-A-E-I-NO-BHA - Size TOW 5626'BOW 5643'Hydril 563 3.00 255900' Depth in / out 100% Gas In Air=10,000 Units-Connection Comments 44 C-3 Trip (max) 281 Background Average - Mud (lb/bbl)ml/30min 2.992.30 - RPM N/A Lst (lb/100ft2) 9.00 Type 16 3897 C-4i C-4n 66 Chromatograph (ppm) 710 304 Oil / Water Hours 0 Cement C-1 C-5i Sh PV cP Weight Flow In (gpm) Flow In (spm) 47#L-80 Grade Casing Summary Lithology (%) 0.902 1345 - Footage Siltst 4 (current) Units* ClystSs Cht Silt Depth 8094' Avg to6050' Current 159.6175.0 Yesterday's Depth: Current Depth: 24 Hour Progress: 119 SPP (psi) Max @ ft 7044' Date: Time: 0 6400' 8094' 1694' Lime TuffGvl C-5n 503 Alkal Coal Gallons/stroke 489 7 7545' 0 201 1101135 7119'Minimum Depth Maximum in 0 0 51830 Gas Summary 3 8.5"Milled Tooth XR+ 96 190 0 117 136970 907-685-1490Unit Phone: 61 J. Failing Set AtSize 9 5/8" Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / Sherman AK-AM-0901109264 Drill Ahead 6151' 80 - 1.400 251' Report By: 24 C-2 Logging Engineers:Failing / Hammes (max)(current) Cly . . * 24 hr Recap: 98 C-2 Logging Engineers:Failing / Hammes (max)(current) Cly AK-AM-0901109264 Drill Ahead 6151' 80 - 251' Size 9 5/8" Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / Sherman 0 49 197841 907-685-1490Unit Phone: 32 J. FailingReport By: 10 0 60398 1711 8683'Minimum Depth Maximum in Gas Summary 9420' 0 82 57 549 502 Alkal Coal Gallons/stroke 0 8094' 9817' 1723' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 119 SPP (psi) Max @ ft 9313' Date: Time: Depth 9817' Avg to6050' Current 178.0155.0 Ss Cht Silt Siltst 4 (current) Units* Clyst 3 8.5"Milled Tooth XR+ Set At 0.902 1345 - Footage 1.400 Sh PV cP Weight Flow In (gpm) Flow In (spm) 47#L-80 Grade Oil / Water Hours 0 Cement C-1 C-5i Chromatograph (ppm) 657 140 89 1635 C-4i C-4n 30 Lst (lb/100ft2) 8.95 Type 16 Mud (lb/bbl)ml/30min 2.992.30 - RPM N/A Average - (max) 219 Background Trip 34 Comments 133 C-3 100% Gas In Air=10,000 Units-Connection 1-2-WT-A-E-I-NO-BHA - Size TOW 5626'BOW 5643'Hydril 563 3.00 255900' Depth in / out - WOB Smith MDSi616 TFA Condition -8.5"6151' Bit #Bit Type Ratio Mud Data Depth 71-29 API FLDensity (ppg) out (sec/qt) Viscosity Report For: 9631'8.9 9.80 10.56MWD Summary 96% % Total Charges: Rig Activity: 284.0 Cor Solids 10.22 Avg Min YP Max Morning Report Report # 15 Customer: Well: Area: Location: Rig: 22-Feb-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools 1990 ROP ROP (ft/hr) Xceed675, Periscope675, Telescope675, Neoscope 4.23 @ Current Pump & Flow Data: Drill ahead f/ 8094' t/ 9817' MD. Mud Type FazePro Casing Summary Lithology (%) 7 . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) 11 Drill ahead f/ 9817' t/ 11255' MD. 2270 ROP ROP (ft/hr) Xceed675, Periscope675, Telescope675, Neoscope 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 16 Customer: Well: Area: Location: Rig: 23-Feb-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: 233.9 Cor Solids 10.20 Avg Min 11043'8.8 9.89 10.68MWD Summary YP Max Ratio Mud Data Depth 71-29 API FLDensity (ppg) out (sec/qt) Viscosity TFA Condition -8.5" 6151' Bit #Bit Type -Connection 1-2-WT-A-E-I-NO-BHA - Size TOW 5626'BOW 5643'Hydril 563 3.00 25 188 C-3 100% Gas In AirTrip 59 =10,000 Units (max) 302 Background Average - Mud (lb/bbl)ml/30min 2.602.60 - RPM N/A WOB (lb/100ft2) 8.90 Type 15 5900' Depth in / out C-4n 33 Lst 80 1460 C-4i 0 Cement C-1 C-5i Chromatograph (ppm) Flow In (spm) 47#L-80 Grade Oil / Water Hours 599 106 45 - Footage 1.400 Weight -4 (current) Units* Clyst 3 8.5"Milled Tooth XR+ Set At 0.902 Ss Cht Silt Siltst Sh Depth 11255' Avg to6050' Current 163.8145.0 Yesterday's Depth: Current Depth: 24 Hour Progress: 118 SPP (psi) Max @ ft 9855' Date: Time: 0 9817' 11255' 1438' Lime TuffGvl C-5n 516 Alkal Coal Gallons/stroke 697 9944' 0 157 521253 10256'Minimum Depth Maximum in Gas Summary 10 0 74860 0 52 154188 907-685-1490Unit Phone: 23 J. FailingReport By: Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / ShermanReport For: 80 - 251' Size 9 5/8" Comments Smith MDSi616 Cly AK-AM-0901109264 Drill Ahead 6151' 13 PV cP Flow In (gpm) 98 C-2 Logging Engineers:Failing / Hammes (max)(current) . . * 24 hr Recap: 98 C-2 Logging Engineers:Failing / Hammes (max)(current) BROOH 6151' 14 PV cP Flow In (gpm) 80 - 251' Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / ShermanReport For: AK-AM-0901109264 48 111296 907-685-1490Unit Phone: 23 J. FailingReport By: 10 0 68234 964 11282'Minimum Depth Maximum in Gas Summary 11255' 0 137 50 RIH t/ 11347'. Wash down t/ 11373'. Communication w/ MWD tool reestablished. Drill ahead t/ 11347'. MWD Tool failure. 629 535 Alkal Coal Gallons/stroke 0 11255' 11437' 182' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 118 SPP (psi) Max @ ft 11396' Date: Time: Depth 11437' Avg to6050' Current 144.0- Ss Cht Silt Siltst ShCly (current) Units* Clyst 3 8.5"Milled Tooth XR+ Set At 1.400 Weight -0.902 Flow In (spm) 47#L-80 Grade Oil / Water Hours 458 78 Cement C-1 C-5i Chromatograph (ppm) 1591 C-4i 00 C-4n 36 Lst 0 Type 13 5900' Depth in / out 45 - Mud (lb/bbl)ml/30min 2.992.30 - RPM N/A WOB (lb/100ft2) Average 220 (max) 290 Background Trip 89 =10,000 Units110 C-3 BROOH t/ 7902'. Continue BROOH. 100% Gas In Air-Connection 1-2-WT-A-E-I-NO-BHA - Size TOW 5626'BOW 5643'Hydril 563 3.00 25 TFA Condition -8.5" 6151' Bit #Bit Type Footage 4 Mud Data Depth 72-28 API FLDensity (ppg) out (sec/qt) Viscosity 8.9011437'8.7 9.93 10.47MWD Summary YP Max Ratio 96% % Total Charges: Rig Activity: 193.0 Cor Solids 10.15 Avg Min Morning Report Report # 17 Customer: Well: Area: Location: Rig: 24-Feb-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools 1840 ROP ROP (ft/hr) Xceed675, Periscope675, Telescope675, Neoscope 4.23 @ Current Pump & Flow Data: Drill ahead f/ 11255 t/ 11373'. Difficulty with MWD tool. BROOH t/ 9530'. Circulate 3x bottoms up, service rig. Mud Type FazePro Casing Summary Lithology (%) 11 . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) BROOH t/ 5892'. Monitor ECD and pump pressure through shale formation. Continue BROOH t/ 5223'. Flow check - ROP ROP (ft/hr) Xceed675, Periscope675, Telescope675, Neoscope 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 18 Customer: Well: Area: Location: Rig: 25-Feb-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids 10.15 Avg Min 11437'8.8 9.93 10.47MWD Summary YP Max Ratio Mud Data Depth 72-28 API FLDensity (ppg) out (sec/qt) Viscosity 8.90 TFA Condition 0-1-CT-S-X-I-NO-DTF8.5" 6151' Bit #Bit Type Footage 4 -Connection 1-2-WT-A-E-I-NO-BHA 42.00 Size TOW 5626'BOW 5643'Hydril 563 3.00 25 C-3 Max Reaming Gas: 97 units 100% Gas In AirTrip 0 =10,000 Units (max) 0 Background Average 97 45 5438' Mud (lb/bbl)ml/30min 2.732.10 4.0 RPM N/A Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 5900' Weight 11437' 0.902 Flow In (spm) 47#L-80 Grade 14 (current) Units* Clyst 3 8.5"Milled Tooth XR+ Set At 1.400 Ss Cht Silt Siltst ShCly Depth 11437' Avg to6050' Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 11437' 11437' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke well. POOH on elevators. L/D BHA #4. P/U and M/U BHA #5, re-run bit #4. RIH t/ 1597'. Perform shallow hole test. RIH t/ 1695'. 0 0 0 Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 J. FailingReport By: 10 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / ShermanReport For: AK-AM-0901109264 80 80 - 130 251' Size 9 5/8" Comments Smith MDSi616 BROOH 6151' 13 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 98 C-2 Logging Engineers:Failing / Hammes (max)(current) . . * 24 hr Recap: 55 C-2 Logging Engineers:Failing / Hammes (max)(current) BROOH 6151' 14 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 80 80 - 130 251' Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 100944 907-685-1490Unit Phone: 23 J. FailingReport By: 0 0 61232 49 939 11912'Minimum Depth Maximum in Gas Summary 12238' 0 73 48 Begin BROOH. 628 509 Alkal Coal Gallons/stroke 0 11437' 12391' 954' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 120 SPP (psi) Max @ ft 11847' Date: Time: Depth 11437' Avg to6050' Current 173.0- Ss Cht Silt Siltst ShCly (current) Units* Clyst 3 8.5"Milled Tooth XR+ Set At 1.400 Weight 11437' 0.902 Flow In (spm) 47#L-80 Grade 15 Oil / Water Hours 471 84 Type 5900' Cement C-1 C-5i Chromatograph (ppm) 1342 C-4i 00 C-4n 28 Lst 72 Mud (lb/bbl)ml/30min 3.252.50 4.0 RPM N/A Average - (max) 280 Background Trip 41 =10,000 Units106 C-3 100% Gas In Air-Connection 1-2-WT-A-E-I-NO-BHA 42.00 Size TOW 5626'BOW 5643'Hydril 563 3.00 25 TFA Condition 0-1-CT-S-X-I-NO-DTF8.5" 6151' Bit #Bit Type Footage 4 5438' Depth 73-27 API FLDensity (ppg) out (sec/qt) Viscosity 8.90 45 8.9 9.98 10.74MWD Summary YP Max Ratio Mud Data 96% % Total Charges: Rig Activity: 256.0 Cor Solids 10.20 Avg Min Morning Report Report # 19 Customer: Well: Area: Location: Rig: 26-Feb-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools 2260 ROP ROP (ft/hr) Xceed675, Periscope675, Telescope675, Neoscope 4.23 @ Current Pump & Flow Data: RIH t/ 5643'. Calibrate MWD tool. Continue RIH t/ 11250'. Wash t/ 11437'. Drill ahead f/ 11437 t/ TD @ 12391' MD. Mud Type FazePro Casing Summary Lithology (%) 11 12190' . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) - 12391' Circulate 3 BU, begin BROOH. Wash BHA through window. Continue BROOH t/ 5201'. Circulate 2 BU. TOOH on - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 20 Customer: Well: Area: Location: Rig: 27-Feb-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min 10.0 - -MWD Summary YP Max Ratio Mud Data Depth 73-27 API FLDensity (ppg) out (sec/qt) Viscosity 8.90 45 TFA Condition 1-1-CT-A-X-I-NO-TD8.5" 11438' Bit #Bit Type Footage 5 953' -Connection 0-1-CT-S-X-I-NO-DTF 42.00 Size TOW 5626'BOW 5643'Hydril 563 42.00 4 - C-3 Max Gas during BROOH: 110 units. 100% Gas In AirTrip 0 =10,000 Units (max) 0 Background Average 110 Mud (lb/bbl)ml/30min 3.252.50 4.0 RPM N/A Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 6151' Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 15 (current) Units* Clyst 4 8.5"Smith MDSi616 Set At 0.902 Ss Cht Silt Siltst ShCly Depth - Avg to - Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke elevators. L/D BHA #5. - 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 J. FailingReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 80 - 130 120.0 5438' Size 9 5/8" Comments Smith MDSi616 BROOH 11437' 13 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Failing / Sinn (max)(current) . . * 24 hr Recap: 0 C-2 Logging Engineers:Failing / Sinn (max)(current) Prepare to run Liner 11437' 13 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 80 - 130 120.0 5438' Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 0 907-685-1490Unit Phone: 0 J. FailingReport By: 0 0 0 0 - Minimum Depth Maximum in Gas Summary 0 0 0 Tag whipstock @ 5630'. Retrieve whipstock. TOOH t/ surface. L/D whipstock BHA. R/U casing tools. Prepare to run liner. - - Alkal Coal Gallons/stroke 0 12391' 12391' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Depth - Avg to - Current -- Ss Cht Silt Siltst ShCly (current) Units* Clyst 4 8.5"Smith MDSi616 Set At 0.902 Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 14 Oil / Water Hours 0 0 Type 6151' Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl)ml/30min 2.862.20 4.0 RPM N/A Average 5 (max) 0 Background Trip 0 =10,000 Units- C-3 100% Gas In Air-Connection 0-1-CT-S-X-I-NO-DTF 42.00 Size TOW 5626'BOW 5643'Hydril 563 42.00 4 TFA Condition 1-1-CT-A-X-I-NO-TD8.5" 11438' Bit #Bit Type Footage 5 953' Depth 73-27 API FLDensity (ppg) out (sec/qt) Viscosity 8.90 45 8.9 - -MWD Summary YP Max Ratio Mud Data 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min Morning Report Report # 21 Customer: Well: Area: Location: Rig: 28-Feb-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: L/D BHA #5. Slip and cut. M/U whipstock retrieval BHA. RIH t/ 1517'. Shallow hole test. Continue RIH. Mud Type FazePro Casing Summary Lithology (%) - 12391' . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) - 12391' Begin running 5.5" slotted liner f/ surface t/ 2469'. Troubleshoot skate. Service rig. Continue running liner t/ 5912'. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 22 Customer: Well: Area: Location: Rig: 1-Mar-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min 8.9 - -MWD Summary YP Max Ratio Mud Data Depth 73-27 API FLDensity (ppg) out (sec/qt) Viscosity 8.90 45 TFA Condition 1-1-CT-A-X-I-NO-TD8.5" 11438' Bit #Bit Type Footage 5 953' -Connection 0-1-CT-S-X-I-NO-DTF 42.00 Size TOW 5626'BOW 5643'Hydril 563 42.00 4 - C-3 100% Gas In AirTrip 0 =10,000 Units (max) 0 Background Average 0 Mud (lb/bbl)ml/30min 2.732.10 4.0 RPM N/A Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 6151' Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 12 (current) Units* Clyst 4 8.5"Smith MDSi616 Set At 0.902 Ss Cht Silt Siltst ShCly Depth - Avg to - Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke Run through window @ 5626'. Encounter obstruction @ 5912'. Work liner - no success. TOOH w/ liner t/ 4298'. - 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 J. FailingReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 80 - 130 120.0 5438' Size 9 5/8" Comments Smith MDSi616 TOOH w/ Liner 11437' 14 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Failing / Sinn (max)(current) . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) - 12391' Continue TOOH w/ liner t/ surface. Test BOPs. R/D Testing equipment. P/U Cleanout BHA. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 23 Customer: Well: Area: Location: Rig: 2-Mar-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min 9.9 - -MWD Summary YP Max Ratio Mud Data Depth 73-27 API FLDensity (ppg) out (sec/qt) Viscosity 9.10 45 TFA Condition 1-1-CT-A-X-I-NO-TD8.5" 11438' Bit #Bit Type Footage 5 953' -Connection 0-1-CT-S-X-I-NO-DTF 42.00 Size TOW 5626'BOW 5643'Hydril 563 42.00 4 - C-3 No Trip Gas. 100% Gas In AirTrip 0 =10,000 Units (max) 0 Background Average 0 Mud (lb/bbl)ml/30min 2.471.90 4.0 RPM N/A Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 6151' Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 14 (current) Units* Clyst 4 8.5"Smith MDSi616 Set At 0.902 Ss Cht Silt Siltst ShCly Depth - Avg to - Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke - 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 J. FailingReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 80 - 130 120.0 5438' Size 9 5/8" Comments Smith MDSi616 P/U Cleanout BHA 11437' 14 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Failing / Sinn (max)(current) . . * 24 hr Recap: 0 C-2 Logging Engineers:Failing / Sinn (max)(current) Work pipe thru window 11437' 15 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 80 - 130 120.0 5438' Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 0 907-685-1490Unit Phone: 0 J. FailingReport By: 0 0 0 0 - Minimum Depth Maximum in Gas Summary 0 0 0 enter window. Weight mud up to 9.1 ppg. POOH t/ 181'. Rearrange tools and M/U cleanout BHA. RIH t/ 5620'. Work BHA - - Alkal Coal Gallons/stroke 0 12391' 12391' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Depth - Avg to - Current -- Ss Cht Silt Siltst ShCly (current) Units* Clyst 4 8.5"Smith MDSi616 Set At 0.902 Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 14 Oil / Water Hours 0 0 Type 6151' Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl)ml/30min 2.602.00 4.0 RPM N/A Average 129 (max) 0 Background Trip 0 =10,000 Units- C-3 Max Trip Gas: 129 units f/ 5620' t/ 5718' in attempt to clean out window. 100% Gas In Air-Connection 0-1-CT-S-X-I-NO-DTF 42.00 Size TOW 5626'BOW 5643'Hydril 563 42.00 4 TFA Condition 1-1-CT-A-X-I-NO-TD8.5" 11438' Bit #Bit Type Footage 5 953' Depth 73-27 API FLDensity (ppg) out (sec/qt) Viscosity 9.10 47 9.9 - -MWD Summary YP Max Ratio Mud Data 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min Morning Report Report # 24 Customer: Well: Area: Location: Rig: 3-Mar-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: P/U and M/U cleanout BHA. RIH t/ 5635'. Work pipe through tight spot f/ 5636 t/ 5718'. Orientate and attempt to Mud Type FazePro Casing Summary Lithology (%) - 12391' . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) - 12391' Attempt to run through window unsuccessful. POOH t/ surface. L/D BHA and rearrange to new BHA configuration. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 25 Customer: Well: Area: Location: Rig: 4-Mar-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min 9.9 - -MWD Summary YP Max Ratio Mud Data Depth 73-27 API FLDensity (ppg) out (sec/qt) Viscosity 9.10 47 TFA Condition 1-1-CT-A-X-I-NO-TD8.5" 11438' Bit #Bit Type Footage 5 953' -Connection 0-1-CT-S-X-I-NO-DTF 42.00 Size TOW 5626'BOW 5643'Hydril 563 42.00 4 - C-3 Max Trip Gas: 9 units Work pipe f/ 5620-5718' through window. Continue working pipe through window. 100% Gas In AirTrip 0 =10,000 Units (max) 0 Background Average 9 Mud (lb/bbl)ml/30min 2.602.00 4.0 RPM N/A Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 6151' Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 14 (current) Units* Clyst 4 8.5"Smith MDSi616 Set At 0.902 Ss Cht Silt Siltst ShCly Depth - Avg to - Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke RIH t/ 5635'. Work tight spot f/ 5624-5718'. Circulate @ 6235'. TOOH t/ surface. L/D BHA. P/U BHA w/ 5.5" bent joint. RIH t/ 5620'. - 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 J. FailingReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 80 - 130 120.0 5438' Size 9 5/8" Comments Smith MDSi616 Work pipe thru window 11437' 15 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Failing / Sinn (max)(current) . . * 24 hr Recap: 0 C-2 Logging Engineers:Failing / Sinn (max)(current) TOOH 11437' 13 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 80 - 130 120.0 5438' Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 0 907-685-1490Unit Phone: 0 J. FailingReport By: 0 0 0 0 - Minimum Depth Maximum in Gas Summary 0 0 0 casing @ 5618'. Run through window again to establish open window. RIH t/ 5718' @ packer. Circ to top of packer for brine pill. - - Alkal Coal Gallons/stroke 0 12391' 12391' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Depth - Avg to - Current -- Ss Cht Silt Siltst ShCly (current) Units* Clyst 4 8.5"Smith MDSi616 Set At 0.902 Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 15 Oil / Water Hours 0 0 Type 6151' Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl)ml/30min 2.602.00 4.0 RPM N/A Average 45 (max) 0 Background Trip 0 =10,000 Units- C-3 Max Trip Gas: 45 units Spot 30 bbl brine pill. TOOH t/ 1975'. Continue TOOH. 100% Gas In Air-Connection 0-1-CT-S-X-I-NO-DTF 42.00 Size TOW 5626'BOW 5643'Hydril 563 42.00 4 TFA Condition 1-1-CT-A-X-I-NO-TD8.5" 11438' Bit #Bit Type Footage 5 953' Depth 76-24 API FLDensity (ppg) out (sec/qt) Viscosity 9.25 52 8.7 - -MWD Summary YP Max Ratio Mud Data 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min Morning Report Report # 26 Customer: Well: Area: Location: Rig: 5-Mar-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: Work pipe through window - successful. Encounter tight spot @ 5780'. Work pipe f/ 5660' t/ 5907'. Pull back into Mud Type FazePro Casing Summary Lithology (%) - 12391' . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) - 12391' Trip out of hole with 5" drill pipe from 1975' MD to surface. Lay down BHA. Perform rig service. Slip and cut 59' line. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg)Tools Morning Report Report # 27 Customer: Well: Area: Location: Rig: 6-Mar-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min 9.7 --MWD Summary YP Max Ratio Mud Data Depth 75-25 HTHPDensity (ppg) out (sec/qt) Viscosity 9.15 53 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' -Connection 0-1-CT-S-X-I-NO-DTF 42.00 Size TOW 5626'BOW 5643'Hydril 563 42.00 4 - C-3 Max Trip Gas: 12 units milling/whipstock BHA. Trip in hole with 5" drill pipe from 452' MD to 5531' MD. Currently orenting and setting whipstock. 100% Gas In AirTrip 0 =10,000 Units(max) 0 Background Average 12 Mud (lb/bbl)ml/30min 3.252.50 4.0 RPM 5.4 Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 6151' Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 13 (current) Units* Clyst 4 8.5"Smith MDSi616 Set At 0.902 Ss Cht Silt Siltst ShCly Depth - Avg to- Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke Pick up milling BHA. Pick up and rack back 3 stands 5" HWDP. Pick up third party tools. Pick up whipstock assembly and make up - 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 80 - 130 120.0 5438' Size 9 5/8" Comments Smith MDSi616 Set whipstock 11437' 13 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Failing / Sinn (max)(current) . . * 24 hr Recap: 0 C-2 Logging Engineers:Failing / Sinn (max)(current) TIH 14 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 120.0 Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 0 0 0 - Minimum Depth Maximum in Gas Summary 0 0 0 surface. Lay down whipstock and BHA. Clean / clear rig floor. Rig service. Stage exceed directional BHA. Pick up BHA. - Max trip gas: 10 units., - Alkal Coal Gallons/stroke 0 12391' 12391' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Depth - Avg to- Current -- Ss Cht Silt Siltst ShCly (current) Units* Clyst 6 8.5"Smith MDSi616 Set At 0.902 Weight 12391' 0.902 Flow In (spm) 47#L-80 Grade 16 Oil / Water Hours 0 0 Type 6748' Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl)ml/30min 2.862.20 4.0 RPM 5.6 Average 10 (max) 0 Background Trip 0 =10,000 Units- C-3 to 5120' MD. Work through windows. Surveys every 30' from 5636' MD to 5917' MD. Trip in hole to 6176' MD. Currently TIH. Trip in hole from 271' MD to 1695' MD. Change out tools / elevators. Perform shallow hole test. Trip in hole from 1695' MD 100% Gas In Air-Connection 42.00 Size TOW 5626'BOW 5643'Hydril 563 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' Depth 73/279.30 HTHPDensity (ppg) out (sec/qt) Viscosity 9.30 52 9.8 --MWD Summary YP Max Ratio Mud Data 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min Morning Report Report # 28 Customer: Well: Area: Location: Rig: 7-Mar-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg)Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: Finish milling / polishing window area from 5626' MD to 5643' MD. Trip out of hole with 5" DP from 5905' MD to Mud Type FazePro Casing Summary Lithology (%) - 12391' . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) - 12391' Wash / ream from 6176' MD to 12391' MD. Circulate and condition the hole. Back ream out of hole at 400 gpm and - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg)Tools Morning Report Report # 29 Customer: Well: Area: Location: Rig: 8-Mar-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min 11.0 --MWD Summary YP Max Ratio Mud Data Depth 74/269.30 HTHPDensity (ppg) out (sec/qt) Viscosity 9.30 52 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' 591Connection 42.00 Size TOW 5626'BOW 5643'Hydril 563 - C-3 window. 100% Gas In AirTrip 0 =10,000 Units(max) 0 Background Average 685 Mud (lb/bbl)ml/30min 2.732.10 4.0 RPM 6.2 Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 6748' Weight 12391' 0.902 Flow In (spm) 47.0 L-80 Grade 18 (current) Units* Clyst 6 8.5"Smith MDSi616 Set At 0.902 Ss Cht Silt Siltst ShCly Depth - Avg to- Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke 120 rpm from 12391' MD to 11060' MD. Trip out of hole through window at 100 gpm and not rotation. Trip out of hole through - Max trip gas: 685 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 120.0 Size 9 5/8" Comments Smith MDSi616 BROOH 14 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Failing / Sinn (max)(current) . . * 24 hr Recap: 0 C-2 Logging Engineers:Failing / Sinn (max)(current) LD Whipstock 14 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 120.0 Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 0 0 0 - Minimum Depth Maximum in Gas Summary 0 0 0 Back ream out of hole from 6269' MD to 5620' MD. Pump dry pill. Trip out of hole from 5620' MD to surface. - Max trip gas: 24 - Alkal Coal Gallons/stroke 0 12391' 12391' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Depth - Avg to- Current -- Ss Cht Silt Siltst ShCly (current) Units* Clyst 6 8.5"Smith MDSi616 Set At 0.902 Weight 12391' 0.902 Flow In (spm) 47.0 L-80 Grade 18 Oil / Water Hours 0 0 Type 6748' Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl)ml/30min 2.802.10 4.0 RPM 6.4 Average 24 (max) 0 Background Trip 0 =10,000 Units- C-3 Perform shallow hole test. Trip in hole to 5619' MD. Retrieve whipstock assembly. Pump out of hole from 5619' MD to 4370' MD. Lay down BHA. Clean / clear rig floor. Pick up whipstock retrieval BHA. Trip in hole from 2263' MD. Circulate / condition hole. 100% Gas In AirConnection 42.00 Size TOW 5626'BOW 5643'Hydril 563 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' Depth 74/269.40 HTHPDensity (ppg) out (sec/qt) Viscosity 9.40 54 9.8 --MWD Summary YP Max Ratio Mud Data 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min Morning Report Report # 30 Customer: Well: Area: Location: Rig: 9-Mar-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg)Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: Work through tight spot from 5700' MD to 5620' MD. Trip in hole from 5620' MD to 6269' MD. Mud Type FazePro Casing Summary Lithology (%) - 12391' . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) - 12391' Trip out of hole from 1884' MD to surface and lay down BHA. Pick up whipstock retrieval BHA. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg)Tools Morning Report Report # 31 Customer: Well: Area: Location: Rig: 10-Mar-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min 10.7 --MWD Summary YP Max Ratio Mud Data Depth 73/279.35 HTHPDensity (ppg) out (sec/qt) Viscosity 9.35 55 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' Connection 42.00 Size TOW 5626'BOW 5643'Hydril 563 - C-3 Slip / cut 48' drill line. Pick up fishing BHA. Trip in hole to 5557' MD. Tag fish at 5592' MD. Caught fish and jar free. Currently TOOH. whipstock retrieval BHA. Pull whipstock through floor, found safety disconnect was missing. Clean / clear rig floor. 100% Gas In AirTrip 0 =10,000 Units(max) 0 Background Average N/A Mud (lb/bbl)ml/30min 3.122.40 4.0 RPM 7.4 Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 6748' Weight 12391' 0.902 Flow In (spm) 47.0 L-80 Grade 18 (current) Units* Clyst 6 8.5"Smith MDSi616 Set At 0.902 Ss Cht Silt Siltst ShCly Depth - Avg to- Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke Trip in hole to 5624' MD. Tag whipstock at 5624' MD. Jar whipstock free. Trip out of hole from 5601' MD to 163' MD. Lay down - No significant trip gas 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 120.0 Size 9 5/8" Comments Smith MDSi616 TOOH 15 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Failing / Sinn (max)(current) . . * 24 hr Recap: 0 C-2 Logging Engineers:Hammes / Sinn (max)(current) TOOH 16 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 120.0 Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 0 0 0 - Minimum Depth Maximum in Gas Summary 0 0 0 Perform rig maintenance. Pick up milling BHA. Trip in hole with 4.5" DP from 198' MD to 5525' MD. Trip in hole with 5" DP from - No significant trip gas - Alkal Coal Gallons/stroke 0 12391' 12391' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Depth - Avg to- Current -- Ss Cht Silt Siltst ShCly (current) Units* Clyst 6 8.5"Smith MDSi616 Set At 0.902 Weight 12391' 0.902 Flow In (spm) 47.0 L-80 Grade 17 Oil / Water Hours 0 0 Type 6748' Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl)ml/30min 2.992.30 4.0 RPM 7.6 Average N/A (max) 0 Background Trip 0 =10,000 Units- C-3 Trip out of hole sideways with 4.5" DP. Lay down 4.5" DP. Currently TOOH. 5525' MD to 5625' MD. Ream window area from 5624' MD to 5656' MD. Trip out of hole with 5" DP and rack back. 100% Gas In AirConnection 42.00 Size TOW 5626'BOW 5643'Hydril 563 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' Depth 73/279.35 HTHPDensity (ppg) out (sec/qt) Viscosity 9.35 56 10.7 --MWD Summary YP Max Ratio Mud Data 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min Morning Report Report # 32 Customer: Well: Area: Location: Rig: 11-Mar-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: Trip out of hole with 5" DP from 5584' MD to surface. Lay down BHA. Clean / clear rig floor. Mud Type FazePro Casing Summary Lithology (%) - 12391' . . * 24 hr Recap: Mud Type FazePro Casing Summary Lithology (%) - 12391' Lay down 4.5" DP from 3149' MD to surface. Lay down BHA. Rig service. Pick up tools for 5.5" liner run. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 33 Customer: Well: Area: Location: Rig: 12-Mar-2014 12:00 AM Job No.: Daily Charges: 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min 12.0 --MWD Summary YP Max Ratio Mud Data Depth 73/279.35 HTHPDensity (ppg) out (sec/qt) Viscosity 9.35 56 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' Connection 42.00 Size TOW 5626'BOW 5643'Hydril 563 - C-3 Change out swell packers that were already downhole per CoMan. Run in hole from 2170' MD to 4467' MD. Currently RIH liner. 100% Gas In AirTrip 0 =10,000 Units(max) 0 Background Average N/A Mud (lb/bbl)ml/30min 3.122.40 4.0 RPM 7.4 Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type 6748' Weight 12391' 0.902 Flow In (spm) 47.0 L-80 Grade 16 (current) Units* Clyst 6 8.5"Smith MDSi616 Set At 0.902 Ss Cht Silt Siltst ShCly Depth - Avg to- Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke Run in hole with 5.5" liner from surface to 1400' MD. Repair pipe skate. Run in hole from 1400' MD to 2170' MD. - No significant trip gas 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 120.0 Size 9 5/8" Comments Smith MDSi616 RIH Liner 14 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Hammes / Sinn (max)(current) . . * 24 hr Recap: 0 C-2 Logging Engineers:Hammes / Sinn (max)(current) TOOH 14 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 120.0 Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 0 0 0 9 Minimum Depth Maximum in Gas Summary 0 0 0 ppg KCL brine at 9 bpm. Pump 50 bbls high viscosity citric acid spacer. Displace hole with 379 bbls brine. Observe clean brine - Maximum gas while displacing 9 units - Alkal Coal Gallons/stroke 0 12391' 12391' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Depth - Avg to- Current -- Ss Cht Silt Siltst ShCly (current) Units* Clyst 6 8.5"Smith MDSi616 Set At 0.902 Weight 12391' 0.902 Flow In (spm) 47.0 L-80 Grade 17 Oil / Water Hours 0 0 Type 6748' Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl)ml/30min 2.992.30 4.0 RPM 7.4 Average 9 (max) 0 Background Trip 0 =10,000 Units- C-3 back to surface. 520 bbls FazePro sent back to reserve storage. Currently TOOH sideways. 100% Gas In AirConnection 42.00 Size TOW 5626'BOW 5643'Hydril 563 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' Depth 73/279.35 HTHPDensity (ppg) out (sec/qt) Viscosity 9.35 53 10.7 --MWD Summary YP Max Ratio Mud Data 96% % Total Charges: Rig Activity: - Cor Solids - Avg Min Morning Report Report # 34 Customer: Well: Area: Location: Rig: 13-Mar-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: Run in hole with 5.5" liner. Land liner at 5461' MD and liner shoe at 12385' MD.Displace from FazePro to 8.7 Mud Type FazePro Casing Summary Lithology (%) - 12391' . . * 24 hr Recap: Mud Type KCL Brine Casing Summary Lithology (%) - 12391' Trip out of hole and lay down 5" drill pipe from 5140' MD to surface. Rig up for 4.5" tubing run. Make up pump - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 35 Customer: Well: Area: Location: Rig: 14-Mar-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: - Chlorides - Avg Min 40000.0 --MWD Summary YP Max Ratio Mud Data Depth 8.80 HTHPDensity (ppg) out (sec/qt) Viscosity 8.80 28 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' Connection 42.00 Size TOW 5626'BOW 5643'Hydril 563 - C-3 100% Gas In AirTrip 0 =10,000 Units(max) 0 Background Average N/A Mud (lb/bbl)ml/30min 4.0 RPM Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type Weight 12391' 0.902 Flow In (spm) 47.0 L-80 Grade (current) Units* Clyst Set At Ss Cht Silt Siltst ShCly Depth - Avg to- Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12391' 12391' 0' Lime TuffGvl C-5n - Alkal Coal Gallons/stroke and motor assemblies. Hook up ESP cable. Currently rigging up 4.5" cable. - No significant gas 0 0 0N/A Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 120.0 Size 9 5/8" Comments Smith MDSi616 Run Completions PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 0 C-2 Logging Engineers:Hammes / Sinn (max)(current) . . * 24 hr Recap: 0 C-2 Logging Engineers:Hammes / Sinn (max)(current) Run Completions PV cP Flow In (gpm) Depth in / out WOB (lb/100ft2) 120.0 Size 9 5/8" Comments Smith MDSi616 Eni Petroleum Nabors 245E OP03-P05 L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901109264 0 907-685-1490Unit Phone: 0 C. SinnReport By: 0 0 0 0 N/A Minimum Depth Maximum in Gas Summary 0 0 0 5313' MD. Lay down 4.5" tubing tools from floor. Pick up landing joints and hanger. Cut and splice ESP cable. Prep to land - No significant gas - Alkal Coal Gallons/stroke 0 12391' 12391' 0' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Depth - Avg to- Current -- Ss Cht Silt Siltst ShCly (current) Units* Clyst Set At Weight 12391' 0.902 Flow In (spm) 47.0 L-80 Grade Oil / Water Hours 0 0 Type Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl)ml/30min 4.0 RPM Average N/A (max) 0 Background Trip 0 =10,000 Units- C-3 4.5" tubing. 100% Gas In AirConnection 42.00 Size TOW 5626'BOW 5643'Hydril 563 TFA Condition 1-1-CT-A-X-I-NO-TD8.5"11438' Bit #Bit Type Footage 5 953' Depth 8.75 HTHPDensity (ppg) out (sec/qt) Viscosity 8.75 27 40000.0 --MWD Summary YP Max Ratio Mud Data 96% mg/L Total Charges: Rig Activity: - Chlorides - Avg Min Morning Report Report # 36 Customer: Well: Area: Location: Rig: 15-Mar-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: Complete rig up for 4.5" tubing run. Pull ESP cable through shiv and splice. Run in hole with 4.5" tubing to Mud Type KCL Brine Casing Summary Lithology (%) - 12391' WELL INFORMATION Created On : May 07 2014 Customer :Eni Petroleum Well Name :OP03-P05L1 Job Number :AK-XX-0901109264 Rig Name :Nabors 245E Field Name :Nikaitchuq Country :USA Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 5553.27 71.67 4.47 3584.77 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 5626.00 72.38 0.37 3,607.22 69.10 N 2.92 E 69.06 5.45 5643.00 74.18 359.31 3,612.11 85.38 N 2.87 E 85.34 12.16 5717.37 75.54 358.76 3,631.54 157.16 N 1.66 E 157.12 1.96 5790.57 76.07 358.22 3,649.49 228.10 N 0.21 W 228.08 1.02 5828.37 78.53 357.95 3,657.80 264.95 N 1.44 W 264.95 6.55 5886.64 78.74 357.53 3,669.28 322.03 N 3.70 W 322.05 0.79 5917.57 80.15 358.07 3,674.95 352.42 N 4.86 W 352.45 4.87 6013.52 86.94 358.10 3,685.73 447.65 N 8.05 W 447.71 7.08 6109.30 86.94 356.05 3,690.84 543.16 N 12.93 W 543.28 2.14 6205.23 87.51 351.58 3,695.49 638.40 N 23.25 W 638.64 4.69 6301.19 88.80 351.23 3,698.58 733.23 N 37.58 W 733.65 1.39 6395.94 89.25 350.57 3,700.19 826.77 N 52.57 W 827.38 0.84 6491.64 89.34 349.87 3,701.37 921.07 N 68.82 W 921.89 0.74 6587.38 88.72 350.36 3,702.99 1,015.38 N 85.26 W 1016.40 0.83 6683.11 87.26 350.45 3,706.34 1,109.71 N 101.20 W 1110.93 1.53 6778.85 87.70 350.61 3,710.55 1,204.05 N 116.94 W 1205.47 0.49 6874.70 89.15 351.82 3,713.19 1,298.74 N 131.57 W 1300.34 1.97 6970.61 89.36 352.91 3,714.44 1,393.79 N 144.31 W 1395.54 1.16 7066.36 88.24 352.58 3,716.44 1,488.75 N 156.40 W 1490.65 1.22 7161.13 86.27 353.78 3,720.98 1,582.73 N 167.64 W 1584.78 2.43 7258.51 84.64 354.70 3,728.70 1,679.31 N 177.39 W 1681.48 1.92 7353.52 85.83 357.08 3,736.59 1,773.74 N 184.17 W 1775.99 2.79 7448.90 84.23 359.28 3,744.85 1,868.71 N 187.19 W 1870.98 2.84 7545.06 83.02 2.38 3,755.53 1,964.25 N 185.81 W 1966.50 3.44 7640.82 86.34 5.06 3,764.41 2,059.37 N 179.62 W 2061.53 4.45 7736.58 86.07 6.26 3,770.75 2,154.45 N 170.19 W 2156.48 1.28 7832.40 81.99 6.26 3,780.71 2,249.17 N 159.80 W 2251.05 4.26 7928.50 78.51 6.84 3,796.99 2,343.24 N 149.01 W 2344.98 3.67 8024.14 80.97 6.02 3,814.02 2,436.76 N 138.47 W 2438.35 2.71 8119.91 83.27 4.38 3,827.15 2,531.22 N 129.88 W 2532.70 2.94 8215.54 87.37 4.08 3,834.95 2,626.25 N 122.85 W 2627.63 4.30 INSITE V8.0.20 Page 1Job No:AK-XX-0901109264 Well Name:OP03-P05L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 8310.72 87.45 3.40 3,839.25 2,721.13 N 116.65 W 2722.42 0.72 8406.47 91.30 3.03 3,840.30 2,816.71 N 111.28 W 2817.92 4.04 8502.35 92.42 4.01 3,837.18 2,912.35 N 105.39 W 2913.48 1.55 8598.09 93.26 4.53 3,832.44 3,007.71 N 98.27 W 3008.73 1.03 8693.73 90.70 2.94 3,829.14 3,103.08 N 92.05 W 3104.01 3.15 8789.66 86.99 0.57 3,831.07 3,198.92 N 89.11 W 3199.81 4.59 8885.60 88.94 0.48 3,834.48 3,294.79 N 88.23 W 3295.66 2.03 8981.38 90.04 359.12 3,835.33 3,390.56 N 88.57 W 3391.43 1.83 9077.11 90.98 359.23 3,834.48 3,486.28 N 89.95 W 3487.15 0.99 9172.85 89.59 357.09 3,834.00 3,581.96 N 93.02 W 3582.87 2.67 9268.63 88.37 355.61 3,835.71 3,677.53 N 99.12 W 3678.50 2.00 9364.66 86.85 354.10 3,839.71 3,773.08 N 107.72 W 3774.16 2.23 9460.72 86.56 354.96 3,845.23 3,868.54 N 116.86 W 3869.74 0.94 9556.22 86.26 357.71 3,851.21 3,963.65 N 122.95 W 3964.92 2.89 9651.90 86.46 1.07 3,857.29 4,059.12 N 123.97 W 4060.39 3.51 9747.39 86.87 0.71 3,862.84 4,154.44 N 122.49 W 4155.68 0.57 9843.25 87.35 359.83 3,867.68 4,250.17 N 122.04 W 4251.40 1.04 9939.09 89.23 358.47 3,870.54 4,345.95 N 123.46 W 4347.19 2.42 10035.00 91.46 358.80 3,869.96 4,441.83 N 125.75 W 4443.09 2.35 10130.56 92.80 358.27 3,866.41 4,537.29 N 128.19 W 4538.57 1.51 10226.72 90.64 358.19 3,863.52 4,633.35 N 131.16 W 4634.67 2.25 10321.97 90.16 357.82 3,862.86 4,728.54 N 134.47 W 4729.89 0.64 10417.71 88.15 357.65 3,864.27 4,824.19 N 138.25 W 4825.58 2.11 10513.39 87.92 359.07 3,867.55 4,919.77 N 140.99 W 4921.19 1.50 10609.31 88.00 1.36 3,870.97 5,015.63 N 140.63 W 5017.03 2.39 10705.28 87.19 2.81 3,874.99 5,111.44 N 137.14 W 5112.80 1.73 10801.45 89.00 2.98 3,878.19 5,207.43 N 132.29 W 5208.71 1.89 10897.08 88.74 0.89 3,880.08 5,302.99 N 129.06 W 5304.22 2.20 10992.97 86.81 359.70 3,883.80 5,398.80 N 128.57 W 5400.01 2.36 11088.90 86.79 359.93 3,889.15 5,494.58 N 128.88 W 5495.79 0.24 11184.69 87.94 0.40 3,893.56 5,590.26 N 128.60 W 5591.46 1.30 11280.47 87.17 359.83 3,897.64 5,685.95 N 128.41 W 5687.14 1.00 11376.45 88.30 359.95 3,901.44 5,781.86 N 128.59 W 5783.04 1.18 11471.81 87.98 1.15 3,904.53 5,877.16 N 127.68 W 5878.32 1.30 11567.35 86.59 2.60 3,909.06 5,972.54 N 124.56 W 5973.65 2.10 11663.16 87.58 2.42 3,913.93 6,068.13 N 120.37 W 6069.18 1.05 11759.24 88.36 3.23 3,917.33 6,164.03 N 115.63 W 6165.02 1.17 11855.07 88.83 5.79 3,919.68 6,259.53 N 108.10 W 6260.41 2.72 11950.98 88.32 5.16 3,922.07 6,354.97 N 98.95 W 6355.72 0.84 12047.32 88.42 2.63 3,924.81 6,451.04 N 92.41 W 6451.70 2.63 12142.60 88.37 2.77 3,927.48 6,546.18 N 87.92 W 6546.77 0.16 12238.54 87.65 0.20 3,930.81 6,642.02 N 85.44 W 6642.57 2.78 12328.82 89.39 358.38 3,933.14 6,732.26 N 86.56 W 6732.81 2.79 12391.00 89.39 358.38 3,933.80 6,794.41 N 88.32 W 6794.98 0.00 INSITE V8.0.20 Page 2Job No:AK-XX-0901109264 Well Name:OP03-P05L1 Survey Report DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (Grid) - A total correction of 0.00 deg from Magnetic north to Grid north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 12,391.00 feet is 6,794.98 feet along 359.26 degrees (Grid) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.20 Page 3Job No:AK-XX-0901109264 Well Name:OP03-P05L1 Survey Report