Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-182
Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Nabors 245
Date: March 15, 2014
Surface Data Logging
End of Well Report
OP03-P05L1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. Formation Tops
5. Mud Record
6. Bit Record
7. Morning Reports
8. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: ENI Petroleum
Rig: Nabors 245
Well: OP03-P05L1
Field: Nikaitchuq Project
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-029-23396-60-00
Sperry Job Number: AK-XX-0901109264
Job Start Date: 08 February 2014
Spud Date: 08 February 2014
Total Depth: 12391’ MD, 3934’ TVD
North Reference: True
Declination: 19.482°
Dip Angle: 81.024°
Total Field Strength: 57625.165 nT
Date Of Magnetic Data: 13 February 2014
Wellhead Coordinates N: North 70° 30' 39.892"
Wellhead Coordinates W: West 149° 51' 46.669"
Drill Floor Elevation 53.30’
Ground Elevation: 12.20’
Permanent Datum: Mean Sea Level
SDL Engineers: Charles Sinn, Josiah Failing, Leif Hammes,
Jacob Hansen
SDL Sample Catchers: N/A
Company Geologist: Andrew Buchanan
Company Representatives: Bruce Simonson / Ben Perry
SSDS Unit Number: 121
DAILY SUMMARY
02/08/2014
SDL continues on location from previous well. Move rig onto new well. Rig up to kill well.
Attempt to kill well with 8.5 ppg brine. Bullhead 80 bbls down 4.5" tubing, bullhead 310 bbls
down annulus. Shutdown and monitor well while bleeding off annulus pressure.
02/09/2014
Continue to kill well, weight up from 8.5 ppg to 8.6 ppg. Bullhead 310 bbls 8.6 ppg down
annulus. Nipple down the tree and nipple up the BOPs. Pick up testing tools. PSI test the BOP.
02/10/2014
BOP test failed, change Upper Ram Blocks on BOP, and finish BOP test. Rig up tools to pull
4.5” tubing. Pull and lay down tubing.
02/11/2014
Continue to trip out 4.5” production tubing to surface. Clean and clear rig floor. Lay down ESP
equipment and remove pump components. Prep for cleanout run, and pick up cleanout BHA.
02/12/2014
Pick up and trip in Scraper with 5” DP to 5740’ MD. Trip out to surface and lay down scraper
while adding 10 bbls/hr. Clean and clear rig floor, and proceed to pick up Packer and 30 joints of
5” DP. Trip in packer to 5142’ MD’
02/13/2014
Circulate and set Packer at 5716’ MD, continue to circulate until Brine returned. Trip out to
surface and lay down Packer BHA. Run E-line F/Cement logging operation from 7505’ MD to
4385’ MD. Pull out and rig down E-line. Pick up whipstock assembly.
02/14/2014
Trip in Whipstock to 5716’ MD while preforming shallow hole test at 2653’ MD. Begin milling
operation with the top of the window at 5626’ MD and the bottom of the window at 5643’ MD.
Drill Rat Hole to 5663’ MD and clean window while pumping a fiber sweep. Pump dry job and
trip out to surface.
Gas: There was a Max Gas of 11 units from 5656' MD with an Average Gas of 10 units
02/15/2014
Lay down Milling BHA. Drain BOP stack and cycle Rams. Pick up Mud Motor BHA, and trip in
while preforming a shallow hole test at 2014’MD. Break circ pump, then circulate and condition
mud. Preform FIT test, orientate tool face, tag bottom at 5664’ MD, and proceed to drill ahead to
5780’ MD.
Gas: There was a Max Gas of 28 units from 5719' MD with an Average Gas of 20 units
02/16/2014
Continue Drilling ahead to 5899’ MD. Completed Build section; pumped 1 bottoms up, then a
Dry Job. Tripped out to surface and lay down BHA. Pick up test tools and test BOPs.
Gas: There was a Max Gas of 116 units from 5842' MD with an Average Gas of 36 units
02/17/2014
Continue to test BOP’s. Lay down the test tools, install wear bushing, pick up drilling BHA. Trip
in to hole, while preforming shallow hole test at 2662’ MD. Tag bottom at 5572’ MD. Circulate
and wash to 5600’ MD. Attempt to reenter window, fight it to 5763’ MD. Pull back to 5722’ MD.
Gas: There was a Max Gas of 54 units while tripping.
02/18/2014
Back ream to 5518’ MD, start to rotate and ream in to 5725’ MD. Pull back to casing at
5613’MD, and pull out of hole because of pack off. Pump swab sweep at 4840’ and trip out to
surface. Lay down Xceed BHA and pick up mud motor BHA. Trip in to 5836’ MD while
preforming shallow hole test at 1668’MD.
Gas: There was a Max Gas of 60 units while tripping.
02/19/2014
Wash and ream down to 5900’MD. Back ream to 5672’MD. Circulate 4 bottoms up, and preform
FIT test. Drill ahead sliding and rotating to 6151’ MD. Back ream to 5574’ MD. Slip and cut then
run in with 5” DP. No problems, trip out on elevators.
Gas: There was a Max Gas of 44 units while reaming.
02/20/2014
Continue to trip out to surface. Lay down BHA#3 and pick up Xceed BHA#4. Trip into 5126’
while performing shallow hole test at 2653’MD. Wash and ream to 6151’MD. Drill ahead to
6400’MD
Gas: There was a Max Gas of 666 units from 6194' MD with an Average Gas of 344 units
02/21/2014
Drill ahead from 6400’MD to 8094’MD.
Gas: There was a Max Gas of 1135 units from 7545' MD with an Average Gas of 489 units
02/22/2014
Drill ahead from 8094’MD to 9817’MD.
Gas: There was a Max Gas of 1711 units from 9420' MD with an Average Gas of 549 units
02/23/2014
Drill ahead from 8917’MD to 11255’MD.
Gas: There was a Max Gas of 1253 units from 9944' MD with an Average Gas of 574 units
02/24/2014
Drill ahead from 11255’ MD to 11373’MD. Communications with MWD tool lost, back ream to
9530’ MD. Circulate 3 bottoms up, service rig. Regain communication with MWD tools; wash in
to 11373’MD. Drill to 11347’MD, lose communication with tool again. Back ream out of the hole
to 7902’ MD.
Gas: There was a Max Gas of 964 units from 11255’' MD with an Average Gas of 629 units
02/25/2014
Continue to back ream out to the window at 5892’MD. Monitor ECD and pump pressure through
the shale formation. Pull out of hole on elevators to surface. Laydown BHA#4 and pickup
BHA#5, rerun bit #4, while changing out MWD tools. Trip in to 1695’ MD and preform shallow
hole test.
Gas: There was a Max Gas of 97 units while reaming
02/26/2014
Continue to trip in to 11250’MD. Drill ahead to 12391’ MD. Begin to back ream out.
Gas: There was a Max Gas of 939 units from 12238’' MD with an Average Gas of 628 units
02/27/2014
Circulate 3 bottoms up, and back ream out to 5201’ MD. Wash BHA through window. Trip out
on elevators to surface. Lay down BHA#5.
Gas: There was a Max Gas of 110 units while reaming
02/28/2014
Continue to lay down BHA #5. Slip and cut. Make up whipstock retrieval BHA. Trip in and tag
whipstock at 5630’ MD. Retrieve, trip to surface, and lay down BHA. Rig up casing tools.
03/01/2014
Begin to run 5.5” slotted liner to 2469’ MD. Trouble shoot skate and service rig. Run through
window at 5626’ MD. Encounter obstruction @ 5912’MD. Work liner with no success, trip back
to 2498’MD.
03/02/2014
Continue to trip liner out to surface. Test BOP’s. Rig down testing equipment and pick up clean
out BHA.
Gas: No trip gas observed.
03/03/2014
Continue to pick up clean out BHA. Trip in to 5635’MD. Work through tight spot from 5636 to
5718’MD Orientate and attempt to enter window. Bring mud weight to 9.1 ppg. Pull out to
181’MD, rearrange tools on clean out BHA and trip in to 5620’MD. Work tight spot from
5620’MD to 5718’ MD to clean window.
Gas: There was a Max Gas of 129 units while reaming
03/04/2014
Attempt to run through window unsuccessful. Trip out to surface. Lay down and reconfigure
BHA. Trip in to 5635’MD. Work tight spot to 5718’MD. Circulate at 6235’MD and trip to surface.
Lay down BHA, and pick up new BHA with 5.5” bent joint. Trip to window and work pipe from
5620’ MD to 5718’ MD.
Gas: There was a Max Gas of 9 units while reaming
03/05/2014
Work pipe through window - successful. Encounter tight spot @ 5780'. Work pipe from 5660'
MD to 5907' MD. Pull back into casing @ 5618'. Run through window again to establish open
window. Run in hole to 5718' MD at packer. Circulate to top of packer for brine pill. Spot 30 bbl
brine pill. Trip out of hole to 1975' MD. Continue trip out of hole.
Gas: There was a Max trip gas of 45 units
03/06/2014
Trip out of hole with 5" drill pipe from 1975' MD to surface. Lay down BHA. Perform rig service.
Slip and cut 59' line. Pick up milling BHA. Pick up and rack back 3 stands 5" HWDP. Pick up
third party tools. Pick up whipstock assembly and make up milling/whipstock BHA. Trip in hole
with 5" drill pipe from 452' MD to 5531' MD. Currently orientating and setting whipstock.
Gas: There was a Max trip gas of 12 units
03/07/2014
Finish milling / polishing window area from 5626' MD to 5643' MD. Trip out of hole with 5" DP
from 5905' MD to surface. Lay down whipstock and BHA. Clean / clear rig floor. Rig service.
Stage exceed directional BHA. Pick up BHA. Trip in hole from 271' MD to 1695' MD. Change
out tools / elevators. Perform shallow hole test. Trip in hole from 1695' MD to 5120' MD. Work
through windows. Surveys every 30' from 5636' MD to 5917' MD. Trip in hole to 6176' MD. Trip
in hole.
Gas: There was a Max Gas of 10 units
03/08/2014
Wash / ream from 6176' MD to 12391' MD. Circulate and condition the hole. Back ream out of
hole at 400 gpm and 120 rpm from 12391' MD to 11060' MD. Trip out of hole through window at
100 gpm and not rotation. Trip out of hole through window.
Gas: There was a Max trip gas of 685 units
03/09/2014
Work through tight spot from 5700' MD to 5620' MD. Trip in hole from 5620' MD to 6269' MD.
Back ream out of hole from 6269' MD to 5620' MD. Pump dry pill. Trip out of hole from 5620' MD
to surface. Lay down BHA. Clean / clear rig floor. Pick up whipstock retrieval BHA. Trip in hole
from 2263' MD. Circulate / condition hole. Perform shallow hole test. Trip in hole to 5619' MD.
Retrieve whipstock assembly. Pump out of hole from 5619' MD to 4370' MD.
Gas: There was a Max trip gas of 24 units
03/10/2014
Trip out of hole from 1884' MD to surface and lay down BHA. Pick up whipstock retrieval BHA.
Trip in hole to 5624' MD. Tag whipstock at 5624' MD. Jar whipstock free. Trip out of hole from
5601' MD to 163' MD. Lay down whipstock retrieval BHA. Pull whipstock through floor, found
safety disconnect was missing. Clean / clear rig floor. Slip / cut 48' drill line. Pick up fishing BHA.
Trip in hole to 5557' MD. Tag fish at 5592' MD. Catch fish and jar free. Trip out of hole.
03/11/2014
Trip out of hole with 5" DP from 5584' MD to surface. Lay down BHA. Clean / clear rig floor.
Perform rig maintenance. Pick up milling BHA. Trip in hole with 4.5" DP from 198' MD to 5525'
MD. Trip in hole with 5" DP from 5525' MD to 5625' MD. Ream window area from 5624' MD to
5656' MD. Trip out of hole with 5" DP and rack back. Trip out of hole with 4.5" DP. Lay down
4.5" DP.
03/12/2014
Lay down 4.5” drill pipe from 3149’ MD to surface. Lay down BHA. Service the rig. Pick up tools
for 5.5” liner run. Run in hole with 5.5” liner from surface to 1400’ MD. Repair pipe skate. Run in
hole from 1400’ MD to 2170’ MD. Change out swell packers that were already down hole per
CoMan. Run in hole from 2170’ MD to 4467’ MD. Run in hole liner.
03/13/2014
Run in hole with 5.5" liner. Land liner at 5461' MD and liner shoe at 12385' MD.Displace from
FazePro to 8.7 ppg KCL brine at 9 bpm. Pump 50 bbls high viscosity citric acid spacer. Displace
hole with 379 bbls brine. Observe clean brine back to surface. 520 bbls FazePro sent back to
reserve storage. Trip out of hole.
Gas: Maximum gas while displacing 9 units
03/14/2014
Trip out of hole and lay down 5" drill pipe from 5140' MD to surface. Rig up for 4.5" tubing run.
Make up pump and motor assemblies. Hook up ESP cable. Rig up 4.5" cable.
Gas: No significant gas
03/15/2014
Complete rig up for 4.5" tubing run. Pull ESP cable through shiv and splice. Run in hole with
4.5" tubing to 5313' MD. Lay down 4.5" tubing tools from floor. Pick up landing joints and
hanger. Cut and splice ESP cable. Prepare to land 4.5" tubing.
Gas: No significant gas
03/16/2014
Land 4.5” tubing. Rig down. Release rig for move.
Gas: No significant gas
5000
6000
7000
8000
9000
10000
11000
12000
13000
0 5 10 15 20 25 30 35 40
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
WELL NAME: OP03-P05L1
OPERATOR: Eni Petroleum
MUD CO: MI Swaco
RIG: Nabors 245
SPERRY JOB: AK-XX-0901109264
Days vs. Depth
06 February 2014
SDL Services
On Location from Previous Well
LOCATION: Oliktok Point
AREA: Nikaitchuq Field
STATE: Alaska
SPUD: 8-Feb-2014
TD: 26-Feb-2014
Commenced 8.5" Lateral
Hole Section
On Bot: 10:00 14 Feb 2014
Problem landing liner
Conduct clean out runs to
reslove issue
POOH for MWD tool Failure
24 Feb 2014
TD Lateral Hole Section
12391' MD, 3934' TVD
Off Bot: 23:30 26 Feb 2014
Landed 5.5" Liner
12385' MD, 3934' TVD
13 Mar2014
WELL NAME:OP03-P05L1 LOCATION:Oliktok Point
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:8-Feb-2014
SPERRY JOB:AK-XX-0901109264 TD:26-Feb-2014
Marker MD INC AZ TVD TVDSS
Schraeder Bluff 5,167.0 67.3 11.2 3,440.5 -3,387.3
N Sand Top 5,384.5 66.2 9.7 3,524.4 -3,471.2
N sbl 2 5,422.5 67.5 8.8 3,539.4 -3,486.2
N sbl 3 5,475.5 69.5 7.8 3,539.4 -3,505.5
N Sand Base 5,527.5 70.7 5.8 3,576.4 -3,523.2
OA-Sand Top 6,052.0 86.9 357.3 3,687.9 -3,634.6
OA-2 7,325.0 85.5 356.4 3,734.3 -3,681.0
OA-3 7,578.0 84.2 3.3 3,758.7 -3,705.4
Fault 1 7,728.0 86.1 6.2 3,770.3 -3,717.0
OA-Sand Top 8,108.0 83.0 4.6 3,825.6 -3,772.3
OA-Sand Top 8,611.0 92.9 4.3 3,832.1 -3,778.8
OA-Sand Top 8,782.0 87.3 0.8 3,831.0 -3,777.7
OA-2 9,449.0 86.6 354.9 3,844.7 -3,791.4
OA-3 9,625.0 86.4 0.1 3,855.7 -3,802.4
OA-3 10,139.0 92.6 358.3 3,866.3 -3,813.0
OA-2 10,314.0 90.2 357.9 3,863.0 -3,809.7
OA-2 10,925.0 88.2 0.5 3,881.3 -3,828.0
OA-2 11,019.0 86.8 359.8 3,885.4 -3,832.1
Formation Tops
OP03-P05L1 Oliktok Point
Eni Petroleum Nikaitchuq Field
MI Swaco Alaska
Nabors 245
AK-XX-0901109264
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/R
6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Elec Stab CaCl2 Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb
2/15/2014 5664 8.7 52 14 20 8/8/9 6.2 48/34/28/22/9/8 NA/1 6.88 70 1.6 2.08 603 -Drill 8.5" Hole L1
2/16/2014 5900 8.7 50 13 21 7/7/8 6.4 45/32/26/20/9/8 NA/1 6.69 64 1.6 2.08 550 -Drill 8.5" Hole L1
2/17/2014 5900 8.7 48 13 18 7/7/9 6.6 44/31/25/20/9/8 NA/1 6.82 64 1.5 1.95 529 -Drill 8.5" Hole L1
2/18/2014 5900 8.9 49 14 19 8/8/9 NA 47/33/28/22/9/8 NA/1 7.8 64 1.6 2.08 630 -Drill 8.5" Hole L1
2/19/2014 6151 8.95 47 13 18 7/7/8 6.9 44/31/25/19/9/8 NA/1 8.8 71 1.7 2.21 540 -Drill 8.5" Hole L1
2/20/2014 6184 8.95 47 14 16 7/7/8 6.6 44/30/25/19/8/7 NA/1 8.8 71 1.8 2.34 530 -Drill 8.5" Hole L1
2/21/2014 7852 9 45 13 16 6/6/7 6.2 42/29/23/17/7/6 NA/1 8.8 71 2.3 2.99 480 -Drill 8.5" Hole L1
2/22/2014 9631 8.95 45 13 16 6/7/7 6.4 42/29/23/17/7/6 NA/1 8.89 71 2.3 2.99 392 -Drill 8.5" Hole L1
2/23/2014 11046 8.9 45 13 15 6/6/7 6.2 41/28/22/16/7/6 NA/1 8.83 71 2 2.6 455 -Drill 8.5" Hole L1
2/24/2014 11437 8.9 45 14 13 6/6/7 N/A 41/27/22/16/7/6 NA/1 8.71 65 2.3 2.99 450 -Drill 8.5" Hole L1
2/25/2014 11437 8.9 45 13 14 6/6/7 N/A 40/27/21/15/7/6 NA/1 8.8 65 2.1 2.73 450 -Drill 8.5" Hole L1
2/26/2014 12190 8.9 45 14 15 6/7/8 6.0 43/29/24/18/8/7 NA/1 8.85 66 2.50 3.25 450 -Drill 8.5" Hole L1
2/27/2014 12391 8.9 45 13 15 6/6/7 6.0 41/28/22/17/7/6 NA/1 10 66 2.50 3.25 475 -Drill 8.5" Hole L1
2/28/2014 12391 8.9 45 13 14 6/6/7 NA 40/27/21/16/7/6 NA/1 8.9 66 2.20 2.86 485 -Rig up Volant tool
3/1/2014 12391 8.9 45 14 12 6/6/7 NA 40/26/21/16/7/6 NA/1 8.9 66 2.10 2.73 489 -POOH with 5.5" Liner
3/2/2014 12391 9.10 45 14 14 5/6/6 5.9 42/28/22/17/7/6 NA/1 9.9 73.0 1.90 2.47 475.0 -Pick up Cleanout BHA
3/3/2014 12391 9.10 47 15 14 6/6/7 5.8 44/29/24/19/8/7 NA/1 9.9 65.0 2.00 2.60 454.0 -Trip out of hole Cleanout BHA
3/4/2014 12391 9.10 48 12 12 5/6/6 6.5 36/24/19/13/6/5 1 11 74 2.40 3.12 543 -Work pipe at window
3/5/2014 12391 9.25 52 13 15 7/7/8 5.5 41/28/23/17/7/6 1 8.7 68.0 2.00 2.60 600 -Trip out of hole for whipstock
3/6/2014 12391 9.15 53 13 13 6/7/7 5.4 39/26/21/16/7/6 1 9.7 75.0 2.50 3.25 580 -Setting whipstock
3/7/2014 12391 9.30 52 14 16 7/7/8 5.6 44/30/24/18/7/6 1 9.8 73.0 2.20 2.86 605 -Trip in hole with Directional BHA
3/8/2014 12391 9.30 52 14 18 7/7/8 6.2 46/32/25/18/7/6 1 11.0 66.0 2.10 2.73 506 -Back ream out of hole to window
3/9/2014 12391 9.40 54 15 18 8/8/9 6.4 48/33/26/19/8/7 1 9.8 65.0 2.15 2.80 540 -Trip out of hole with whipstock
3/10/2014 12391 9.35 55 15 18 8/8/9 7.4 48/33/27/20/8/7 2 10.7 64.0 2.40 3.12 575 -Trip out of hole with whipstock
3/11/2014 12391 9.35 56 16 17 8/8/9 7.6 49/33/28/21/8/7 2 10.7 64.0 2.30 2.99 530 -Trip out of hole with mill assembly
3/12/2014 12391 9.35 53 14 16 7/7/8 1.8 44/30/24/18/7/6 2 12.0 65.0 2.40 3.12 520 -Run 5.5" Liner
3/13/2014 12391 8.80 27 ------------Trip out of hole post displacement
Casing Record
SPERRY JOB:TD:
8-Feb-2014
26-Feb-2014
20" Conductor @ 160' MD, 160'TVD
9.625" Casing BOW @ 5643' MD, 3612'TVD
5" Liner @ 12385' MD, 3934'TVD
WELL NAME:LOCATION:
OPERATOR:AREA:
MUD CO:STATE:
RIG:SPUD:
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit
Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
1 400 1 Milled Tooth XR+8.50 5664 5899 236 4.90 1.400 48.4 15 60 1550 450 1-2-WT-A-E-I-NO-BHA Mill Window
3 700 1 RR Milled Tooth XR+8.50 5899 6051 251 3.00 1.400 83.9 25 80 1900 520 1-2-WT-A-E-I-NO-BHA Complete Build Section
4 800 2 MDSi616 8.50 6051 11437 5438 42.00 0.902 129.5 4 130 2300 500 0-1-CT-S-X-I-NO-DFT POOH for MWD tool failure
5 900 2 RR MDSi616 8.50 11437 12391 953 7.30 0.902 131.4 4 120 2125 500 1-1-CT-A-X-I-NO-TD TD Lateral Section
WELL NAME:OP03-P05L1 LOCATION:Oliktok Point
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:
SPERRY JOB:AK-XX-0901109264 TD:26-Feb-2014
MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:8-Feb-2014
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:Move rig onto new well. Rig up to kill well. Attempt to kill well with 8.5 ppg brine. Bullhead 80 bbls down 4.5" tubing
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
49500.00
0
8-Feb-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.70
Size
No gas readings
off pressure per CoMan. Currently bleeding off annulus pressure.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901109264
Kill well
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
Bullhead 310 bbls down annulus. Shutdown and monitor well. Tubing psi at 0, annular psi at 238. Opened annulus to bleed
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Hansen
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:Continue to kill well. Weight up from 8.5 ppg to 8.6 ppg. Bullhead 310 bbls 8.6 ppg down annulus. Weight up from
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
48000.00
0
9-Feb-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.80
Size
No gas readings
PSI testing BOP.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901109264
BOP Test
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
8.6 ppg to 8.8 ppg. Pump 245 bbls 8.8 ppg. Nipple down tree / nipple up BOPs. Pick up testing tools. PSI test BOP. Currently
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Hansen
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Leif Hammes
Maximum
Report By:Logging Engineers:L. Hammes / J. Hansen
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
L/D tubbing while pumping 10bbls/hr.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901109264
POOH w/ 4.5 in
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No gas readings
ConditionBit #
8.80
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
10-Feb-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
46000.00
Continue PSI testing BOP; change Upper Ram Blocks in BOP; finish BOP test. R/U tools to pull 4.5" Tubing. Pull and
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Trip out 4.5" production tubing. Clear/clean 3rd party equipment and rig floor. M/U tools and BHA; L/D ESP
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
41000.00
0
11-Feb-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.80
Size
No gas readings
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901109264
P/U scraper
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
equipment. Remove Pump components. Load & strap 5" DP, Prep for clean out run. P/U clean out BHA.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
28
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Leif Hammes
Maximum
Report By:Logging Engineers:L. Hammes / J. Hansen
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Leif Hammes
Maximum
Report By:Logging Engineers:L. Hammes / J. Hansen
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
28
C-5nC-2
in
Minimum
Depth
Time:
clean rig floor. Pick up Packer BHA. Pick up 30 jts 5" DP from 67' to 1023' MD. Trip in from 1023' to 5142' MD.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901109264
Trip in Packer
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No gas readings
ConditionBit #
8.80
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
12-Feb-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
46000.00
Pick up Scraper BHA. Trip in Scraper w/ 5" DP to 5740' MD. TOOH adding 10 bbls/hr. L/D Scraper BHA, clear and
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Circulate and set Packer @ 5716'MD. Circulate until brine seen at surface 3750 strks @ 130g/min. Trip out
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
45000.00
0
13-Feb-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.80
Size
No gas readings
Clean and clear rig floor. Pick up whipstock assembly.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901109264
P/U whipstock
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
from 5701' MD to surface. Run E-line F/Cement logging operation from 7505' MD to 4385' MD. Pull out and rig down E-line.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
28
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Leif Hammes
Maximum
Report By:Logging Engineers:L. Hammes / J. Hansen
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
965
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
0
Leif Hammes
Maximum
Report By:Logging Engineers:L. Hammes / J. Hansen
943
0
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
51
C-5n
5656'
0.0
C-2
11
in
0 5626'Minimum
Depth
Time:
@ 5626' MD. Mill from 5629' MD to BOW @ 5643' MD. Drill rat hole to 5663' MD. Clean window, and pump fiber sweep. Pump
10
-
5563'
20'
Max @ ft Current
5654'2.0
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
4.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
14
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901109264
P/U whipstock
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
FazePro 22
Depth in / out
Mud Type
Lst
Type
Average
NA1Background (max)
Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
Casing
100% Gas In Air=10,000 UnitsConnection
0
There was a Max Gas of 11 units from 5656' MD with an Average Gas of 10 units
dry job, and trip out from 5663' MD to surface.
5660'
ConditionBit #
8.708.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
14-Feb-2014
12:00 AM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
37000.00
P/U Whipstock BHA. TIH from 646' MD to 5716' MD w/ shallow hole test @ 2653' MD. Start milling operation, TOW
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr. Recap:
(max)(current)
7
0
Cly
4023
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
0
Leif Hammes
Maximum
Report By:Logging Engineers:L. Hammes / J. Hansen
2001
894
457
108
Units*
Casing
Summary
Lithology (%)
0
MBT
5780'
pH
1.400
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
52
C-5n
5719'
38.0
C-2
28
in
11 5695'Minimum
Depth
Time:
hole test @ 2014' MD. Trip in to 5595' Md. Break circ pump, circulate and condition mud. Perform FIT test hold for 10 min.
20
5664'
5780'
116'
Max @ ft Current
5663'49.0
Date:
Avg
to5664'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
69.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
14
116'
Footage
2.30
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901109264
P/U whipstock
PV
24 hr Max
Weight
2
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
58.0
FazePro 20
Depth in / out
Mud Type
Lst
Type
Average
NA24Background (max)
Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 675
API FL
Chromatograph (ppm)
5.05664'
WOB
Casing
100% Gas In Air=10,000 UnitsNAConnection
0
There was a Max Gas of 28 units from 5719' MD with an Average Gas of 20 units
Orientate tool face, tag bottom at 5664' MD, and drill ahead to 5780' MD.
5660'
ConditionBit #
1 8.5"
8.75
Milled Tooth Bit
Milled Tooth Bit
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
15-Feb-2014
12:00 AM
Current Pump & Flow Data:
1505
Max
0
Chlorides
mg/l
35000.00
Lay down Milling BHA. Drain BOP stack and cycle Rams. Pick up Mud Motor BHA. Trip in and preforming shallow
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr. Recap:Continue to drill to 5899' MD. Pump 1 Bottoms Up; them pump Dry Job. Trip out to surface and lay down BHA.. Clean
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
36000.00
3
16-Feb-2014
12:00 AM
Current Pump & Flow Data:
0
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
1 8.5"
Milled Tooth Bit
Milled Tooth Bit
8.70
Size
There was a Max Gas of 116 units from 5842' MD with an Average Gas of 36 units
5660'
100% Gas In Air=10,000 UnitsNAConnection
15
Tools
TeleScope 675
API FL
Chromatograph (ppm)
0.05664'5899'
WOB
Casing
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
0Background (max)
Trip
Average
NA
Mud Type
Lst
Type
0.0
FazePro 19
Depth in / out
YP
(lb/100ft2)
021
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
14
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901109264
Test BOP
PV
235'
Footage
6.70
Simonson / Sherman
ShClyst TuffGvlCoal
cP
13
Gas Summary
0
8 6
(current)
Avg
to5780'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
68.0 Flow In (gpm)
Flow In (spm)
5780'
5899'
119'
Max @ ft Current
5792'53.0
Date:
Time:
and clear rig floor, then P/U test tool and test BOPs.
36
in
7 5886'Minimum
Depth C-5n
5842'
0.0
C-2
116'
SPP (psi)
Gallons/stroke
TFABit Type
Depth
47
MBT
5799'
pH
1.400
4
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
14524
4492
907-685-1490Unit Phone:
0
Leif Hammes
Maximum
Report By:Logging Engineers:L. Hammes / J. Hansen
Set AtSize
40.0
Grade
9.63''
(max)(current)
62
15
Cly
15684
.
.
*
24 hr. Recap:
(max)(current)
0
0
Cly
0
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
0
Leif Hammes
Maximum
Report By:Logging Engineers:L. Hammes / J. Failing
0
0
520
123
Units*
Casing
Summary
Lithology (%)
0
MBT
5899'
pH
0.902
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
48
C-5n
0'
0.0
C-2
0
in
0 0'Minimum
Depth
Time:
while preforming shallow hole test at 2652' MD. Tag at 5572' MD Circulate and wash to 5600'MD Attempt to re-enter window, fight it
5
5899'
5899'
0'
Max @ ft Current
0.0
Date:
Avg
to5899'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
13
0'
Footage
0.00
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901109264
Enter Window
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
0.0
FazePro 18
Depth in / out
Mud Type
Lst
Type
Average
548Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 675
API FL
Chromatograph (ppm)
0.05899'0'
WOB
Casing
100% Gas In Air=10,000 UnitsNAConnection
0
There was a Max Gas of 54 units while tripping into the hole with an Average Gas of 5 units
to 5763' MD. Pull back to 5722'MD.
5660'
ConditionBit #
2 8.5"
8.75
MDSi616
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
OP03-P05 L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
17-Feb-2014
12:00 AM
Current Pump & Flow Data:
1813
Max
0
Chlorides
mg/l
33000.00
Continue to test BOPs. Lay down test tools, install wear bushing, pick up drilling BHA. Trip into hole
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
Report By:
9 5/8"
Logging Engineers:Failing / Hammes
(max)(current)
Cly
Depth in / outBit Type RPM
--
-
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman
AK-AM-901109264
Wash down hole
0.902 ----
907-685-1490Unit Phone:
0
J. Failing
Set AtSize
47#L-80
Grade
0
C-2
Gas Summary
2 8.5"MDSi616
0
0
0
0
0
0 0
0
Minimum
Depth
Maximum
in
0
0 0
Begin to pack off. Reduce pump rates, weight up OBM. POOH. Swabbing @ 4840'. Circ BU. Continue POOH. L/D BHA.
Max trip gas 60 units.
Alkal
Coal
Gallons/stroke
0
5900'
5900'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
Max @ ft
Date:
Time:
API FL
Depth
5899'
Avg
to5899'
Current
(current)
Units*
ClystSs Cht Silt
Casing
Summary
Lithology (%)
1.400
1449
-
Footage
PV
cP
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
0
Cement
C-1 C-5i
ShSiltst
Chromatograph (ppm)
0 0
00
C-4i C-4n
0
Lst
(lb/100ft2)
8.90
Type
19
Mud (lb/bbl)ml/30min
2.081.60
-
C-3
Average
60Trip
(max)
0
Comments
45Background
P/U mud motor BHA. RIH t/ 1668'. Perform Shallow hole test. RIH t/ 5576. Wash/ease through window - no problems. Wash
100% Gas In Air=10,000 UnitsConnection
down t/ 5863'.
Bit #
3 8.5"-
-
-
Size
TOW 5626'BOW 5643'Hydril 563
-
WOB
Milled Tooth XR+
TFA Condition
-
MWD Summary
96%
%Mud Type
FazePro N/A
Ratio
Mud Data
Depth
70-30
4.23 @
Current Pump & Flow Data:
Report For:
5900'7.8
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
XP Motor 1.5; Telescope 675
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
18-Feb-2014
12:00 AM
ROP
ROP (ft/hr)
24 hr Max
BROOH t/ 5618' MD. RIH t/ 5709'. Start rotating, continue reaming f/ 5793' t/ 5725'. Pull into casing @ 5613'.
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
Wash down t/ 5900'. BROOH t/ 5672'. Circ 4 BU. Perform FIT. RIH t/ 5900'. Drill ahead sliding/rotating t/ 6151' MD.
ROP
ROP (ft/hr)
24 hr Max
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
19-Feb-2014
12:00 AM
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
199.6
Cor Solids
9.49
Avg Min
YP
MaxECD (ppg)
Tools
XP Motor 1.5; Telescope 675
4.23 @
Current Pump & Flow Data:
Report For:
5900'8.8
MWD Summary
96%
%Mud Type
FazePro N/A
Ratio
Mud Data
Depth
71-29
6151'
WOB
Milled Tooth XR+
TFA Condition
-8.5" 5900'
-
-
Size
TOW 5626'BOW 5643'Hydril 563
Max gas during reaming: 44 units
100% Gas In Air=10,000 Units-Connection
Comments
Background Trip
(max)
12Average
44
Mud (lb/bbl)ml/30min
2.211.70
20.0
C-3
Lst
(lb/100ft2)
8.95
Type
18
Bit #
03
C-4i C-4n
0
Chromatograph (ppm)
40 13
Oil / Water
Hours
0
Cement
C-1 C-5i
Sh
PV
cP
Weight
Flow In (gpm)
Flow In (spm)
Casing
Summary
Lithology (%)
1.400
1347
251'
Footage
Siltst
3
(current)
Units*
ClystSs Cht Silt
API FL
Depth
5899'
Avg
to5899'
Current
92.3-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
Max @ ft
6059'
Date:
Time:
0
5900'
6151'
251'
Lime
TuffGvl
C-5n
Alkal
Coal
Gallons/stroke
BROOH t/ 5574'. Slip and cut. Service Rig. RIH w/ 5" drill pipe t/ 6150' - no issues. BROOH t/ 4717'. TOOH on elevators.
34
3
5946'
0
7 475
5921'Minimum
Depth
Maximum
in
0
3869
2 8.5"MDSi616
3
9
0
5
9309
0
47#L-80
Grade
576
C-2
Gas Summary
---
907-685-1490Unit Phone:
0
J. Failing
Set AtSize
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman
AK-AM-901109264
TOOH
Depth in / outBit Type RPM
--
80.0
0.902 -
Report By:
9 5/8"
Logging Engineers:Failing / Hammes
(max)(current)
Cly
.
.
*
24 hr Recap:
Logging Engineers:Failing / Hammes
(max)(current)
Cly
6151' 80
-
1.400 251'
Report By:
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman
AK-AM-0901109264
Drill Ahead
907-685-1490Unit Phone:
40
J. Failing
Set AtSize
9 5/8"
12
C-2
Gas Summary
3 8.5"Milled Tooth XR+
83
142
0
134
85637
0 0
38229
666
6323'Minimum
Depth
Maximum
in
7
6194'
0
147 74
RIH t/ 5126'. Wash/ream t/ 6151'. Drill ahead t/ 6400'.
344
524
Alkal
Coal
Gallons/stroke
0
6151'
6400'
249'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
124
SPP (psi)
Max @ ft
6183'
Date:
Time:
Depth
6400'
Avg
to6050'
Current
156.2126.0
(current)
Units*
ClystSs Cht Silt
Casing
Summary
Lithology (%)
0.902
1447
-
Footage
Siltst
4
Sh
PV
cP
Weight
Flow In (gpm)
Flow In (spm)
47#L-80
Grade
Oil / Water
Hours
0
Cement
C-1 C-5i
Chromatograph (ppm)
478 234
2284
C-4i C-4n
42
Lst
(lb/100ft2)
8.95
Type
16
Mud (lb/bbl)ml/30min
2.341.80
-
RPM
Average
-
(max)
263
Background Trip
Comments
65
C-3
100% Gas In Air=10,000 Units-Connection
1-2-WT-A-E-I-NO-BHA
-
Size
TOW 5626'BOW 5643'Hydril 563
3.00 255900'
Depth in / out
-
WOB
Smith MDSi616
TFA Condition
-8.5"6151'
Bit #Bit Type
N/A
Ratio
Mud Data
Depth
71-29
API FL
Report For:
6400'8.8
9.64 10.07MWD Summary
96%
%
Total Charges:
Rig Activity:
234.8
Cor Solids
9.91
Avg Min
YP
Max
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
20-Feb-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)
Tools
1820
ROP
ROP (ft/hr)
Xceed675, Periscope675, Telescope675, Neoscope
4.23 @
Current Pump & Flow Data:
TOOH on elevators. L/D BHA #3. P/U and M/U Xceed BHA #4. RIH t/ 2653', perform shallow hole test - good.
Density (ppg)
out (sec/qt)
Viscosity
Mud Type
FazePro
.
.
*
24 hr Recap:
Mud Type
FazePro
Drill ahead f/ 6400' t/ 8094' MD.
1810
ROP
ROP (ft/hr)
Xceed675, Periscope675, Telescope675, Neoscope
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
21-Feb-2014
12:00 AM
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
242.8
Cor Solids
9.94
Avg Min
YP
Max
Report For:
7852'8.8
9.13 10.42MWD Summary
96%
%Ratio
Mud Data
Depth
71-29
API FLDensity (ppg)
out (sec/qt)
Viscosity
-
WOB
Smith MDSi616
TFA Condition
-8.5" 6151'
Bit #Bit Type
1-2-WT-A-E-I-NO-BHA
-
Size
TOW 5626'BOW 5643'Hydril 563
3.00 255900'
Depth in / out
100% Gas In Air=10,000 Units-Connection
Comments
44
C-3
Trip
(max)
281
Background
Average
-
Mud (lb/bbl)ml/30min
2.992.30
-
RPM
N/A
Lst
(lb/100ft2)
9.00
Type
16
3897
C-4i C-4n
66
Chromatograph (ppm)
710 304
Oil / Water
Hours
0
Cement
C-1 C-5i
Sh
PV
cP
Weight
Flow In (gpm)
Flow In (spm)
47#L-80
Grade
Casing
Summary
Lithology (%)
0.902
1345
-
Footage
Siltst
4
(current)
Units*
ClystSs Cht Silt
Depth
8094'
Avg
to6050'
Current
159.6175.0
Yesterday's Depth:
Current Depth:
24 Hour Progress:
119
SPP (psi)
Max @ ft
7044'
Date:
Time:
0
6400'
8094'
1694'
Lime
TuffGvl
C-5n
503
Alkal
Coal
Gallons/stroke
489
7
7545'
0
201 1101135
7119'Minimum
Depth
Maximum
in
0 0
51830
Gas Summary
3 8.5"Milled Tooth XR+
96
190
0
117
136970
907-685-1490Unit Phone:
61
J. Failing
Set AtSize
9 5/8"
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman
AK-AM-0901109264
Drill Ahead
6151' 80
-
1.400 251'
Report By:
24
C-2
Logging Engineers:Failing / Hammes
(max)(current)
Cly
.
.
*
24 hr Recap:
98
C-2
Logging Engineers:Failing / Hammes
(max)(current)
Cly
AK-AM-0901109264
Drill Ahead
6151' 80
-
251'
Size
9 5/8"
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman
0
49
197841
907-685-1490Unit Phone:
32
J. FailingReport By:
10 0
60398
1711
8683'Minimum
Depth
Maximum
in
Gas Summary
9420'
0
82 57
549
502
Alkal
Coal
Gallons/stroke
0
8094'
9817'
1723'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
119
SPP (psi)
Max @ ft
9313'
Date:
Time:
Depth
9817'
Avg
to6050'
Current
178.0155.0
Ss Cht Silt Siltst
4
(current)
Units*
Clyst
3 8.5"Milled Tooth XR+
Set At
0.902
1345
-
Footage
1.400
Sh
PV
cP
Weight
Flow In (gpm)
Flow In (spm)
47#L-80
Grade
Oil / Water
Hours
0
Cement
C-1 C-5i
Chromatograph (ppm)
657 140 89
1635
C-4i C-4n
30
Lst
(lb/100ft2)
8.95
Type
16
Mud (lb/bbl)ml/30min
2.992.30
-
RPM
N/A
Average
-
(max)
219
Background Trip
34
Comments
133
C-3
100% Gas In Air=10,000 Units-Connection
1-2-WT-A-E-I-NO-BHA
-
Size
TOW 5626'BOW 5643'Hydril 563
3.00 255900'
Depth in / out
-
WOB
Smith MDSi616
TFA Condition
-8.5"6151'
Bit #Bit Type
Ratio
Mud Data
Depth
71-29
API FLDensity (ppg)
out (sec/qt)
Viscosity
Report For:
9631'8.9
9.80 10.56MWD Summary
96%
%
Total Charges:
Rig Activity:
284.0
Cor Solids
10.22
Avg Min
YP
Max
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
22-Feb-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)
Tools
1990
ROP
ROP (ft/hr)
Xceed675, Periscope675, Telescope675, Neoscope
4.23 @
Current Pump & Flow Data:
Drill ahead f/ 8094' t/ 9817' MD.
Mud Type
FazePro
Casing
Summary
Lithology (%)
7
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
11
Drill ahead f/ 9817' t/ 11255' MD.
2270
ROP
ROP (ft/hr)
Xceed675, Periscope675, Telescope675, Neoscope
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
23-Feb-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
233.9
Cor Solids
10.20
Avg Min
11043'8.8
9.89 10.68MWD Summary
YP
Max
Ratio
Mud Data
Depth
71-29
API FLDensity (ppg)
out (sec/qt)
Viscosity
TFA Condition
-8.5" 6151'
Bit #Bit Type
-Connection
1-2-WT-A-E-I-NO-BHA
-
Size
TOW 5626'BOW 5643'Hydril 563
3.00 25
188
C-3
100% Gas In AirTrip
59
=10,000 Units
(max)
302
Background
Average
-
Mud (lb/bbl)ml/30min
2.602.60
-
RPM
N/A
WOB
(lb/100ft2)
8.90
Type
15
5900'
Depth in / out
C-4n
33
Lst
80
1460
C-4i
0
Cement
C-1 C-5i
Chromatograph (ppm)
Flow In (spm)
47#L-80
Grade
Oil / Water
Hours
599 106
45
-
Footage
1.400
Weight
-4
(current)
Units*
Clyst
3 8.5"Milled Tooth XR+
Set At
0.902
Ss Cht Silt Siltst Sh
Depth
11255'
Avg
to6050'
Current
163.8145.0
Yesterday's Depth:
Current Depth:
24 Hour Progress:
118
SPP (psi)
Max @ ft
9855'
Date:
Time:
0
9817'
11255'
1438'
Lime
TuffGvl
C-5n
516
Alkal
Coal
Gallons/stroke
697
9944'
0
157 521253
10256'Minimum
Depth
Maximum
in
Gas Summary
10 0
74860
0
52
154188
907-685-1490Unit Phone:
23
J. FailingReport By:
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / ShermanReport For:
80
-
251'
Size
9 5/8"
Comments
Smith MDSi616
Cly
AK-AM-0901109264
Drill Ahead
6151'
13
PV
cP
Flow In (gpm)
98
C-2
Logging Engineers:Failing / Hammes
(max)(current)
.
.
*
24 hr Recap:
98
C-2
Logging Engineers:Failing / Hammes
(max)(current)
BROOH
6151'
14
PV
cP
Flow In (gpm)
80
-
251'
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / ShermanReport For:
AK-AM-0901109264
48
111296
907-685-1490Unit Phone:
23
J. FailingReport By:
10 0
68234
964
11282'Minimum
Depth
Maximum
in
Gas Summary
11255'
0
137 50
RIH t/ 11347'. Wash down t/ 11373'. Communication w/ MWD tool reestablished. Drill ahead t/ 11347'. MWD Tool failure.
629
535
Alkal
Coal
Gallons/stroke
0
11255'
11437'
182'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
118
SPP (psi)
Max @ ft
11396'
Date:
Time:
Depth
11437'
Avg
to6050'
Current
144.0-
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
3 8.5"Milled Tooth XR+
Set At
1.400
Weight
-0.902
Flow In (spm)
47#L-80
Grade
Oil / Water
Hours
458 78
Cement
C-1 C-5i
Chromatograph (ppm)
1591
C-4i
00
C-4n
36
Lst
0
Type
13
5900'
Depth in / out
45
-
Mud (lb/bbl)ml/30min
2.992.30
-
RPM
N/A
WOB
(lb/100ft2)
Average
220
(max)
290
Background Trip
89
=10,000 Units110
C-3
BROOH t/ 7902'. Continue BROOH.
100% Gas In Air-Connection
1-2-WT-A-E-I-NO-BHA
-
Size
TOW 5626'BOW 5643'Hydril 563
3.00 25
TFA Condition
-8.5" 6151'
Bit #Bit Type Footage
4
Mud Data
Depth
72-28
API FLDensity (ppg)
out (sec/qt)
Viscosity
8.9011437'8.7
9.93 10.47MWD Summary
YP
Max
Ratio
96%
%
Total Charges:
Rig Activity:
193.0
Cor Solids
10.15
Avg Min
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
24-Feb-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)
Tools
1840
ROP
ROP (ft/hr)
Xceed675, Periscope675, Telescope675, Neoscope
4.23 @
Current Pump & Flow Data:
Drill ahead f/ 11255 t/ 11373'. Difficulty with MWD tool. BROOH t/ 9530'. Circulate 3x bottoms up, service rig.
Mud Type
FazePro
Casing
Summary
Lithology (%)
11
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
BROOH t/ 5892'. Monitor ECD and pump pressure through shale formation. Continue BROOH t/ 5223'. Flow check
-
ROP
ROP (ft/hr)
Xceed675, Periscope675, Telescope675, Neoscope
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
25-Feb-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
10.15
Avg Min
11437'8.8
9.93 10.47MWD Summary
YP
Max
Ratio
Mud Data
Depth
72-28
API FLDensity (ppg)
out (sec/qt)
Viscosity
8.90
TFA Condition
0-1-CT-S-X-I-NO-DTF8.5" 6151'
Bit #Bit Type Footage
4
-Connection
1-2-WT-A-E-I-NO-BHA
42.00
Size
TOW 5626'BOW 5643'Hydril 563
3.00 25
C-3
Max Reaming Gas: 97 units
100% Gas In AirTrip
0
=10,000 Units
(max)
0
Background
Average
97
45
5438'
Mud (lb/bbl)ml/30min
2.732.10
4.0
RPM
N/A
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
5900'
Weight
11437' 0.902
Flow In (spm)
47#L-80
Grade
14
(current)
Units*
Clyst
3 8.5"Milled Tooth XR+
Set At
1.400
Ss Cht Silt Siltst ShCly
Depth
11437'
Avg
to6050'
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
11437'
11437'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
well. POOH on elevators. L/D BHA #4. P/U and M/U BHA #5, re-run bit #4. RIH t/ 1597'. Perform shallow hole test. RIH t/ 1695'.
0
0 0
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
J. FailingReport By:
10
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / ShermanReport For:
AK-AM-0901109264
80
80 - 130
251'
Size
9 5/8"
Comments
Smith MDSi616
BROOH
6151'
13
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
98
C-2
Logging Engineers:Failing / Hammes
(max)(current)
.
.
*
24 hr Recap:
55
C-2
Logging Engineers:Failing / Hammes
(max)(current)
BROOH
6151'
14
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
80
80 - 130
251'
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
100944
907-685-1490Unit Phone:
23
J. FailingReport By:
0 0
61232 49
939
11912'Minimum
Depth
Maximum
in
Gas Summary
12238'
0
73 48
Begin BROOH.
628
509
Alkal
Coal
Gallons/stroke
0
11437'
12391'
954'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
120
SPP (psi)
Max @ ft
11847'
Date:
Time:
Depth
11437'
Avg
to6050'
Current
173.0-
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
3 8.5"Milled Tooth XR+
Set At
1.400
Weight
11437' 0.902
Flow In (spm)
47#L-80
Grade
15
Oil / Water
Hours
471 84
Type
5900'
Cement
C-1 C-5i
Chromatograph (ppm)
1342
C-4i
00
C-4n
28
Lst
72
Mud (lb/bbl)ml/30min
3.252.50
4.0
RPM
N/A
Average
-
(max)
280
Background Trip
41
=10,000 Units106
C-3
100% Gas In Air-Connection
1-2-WT-A-E-I-NO-BHA
42.00
Size
TOW 5626'BOW 5643'Hydril 563
3.00 25
TFA Condition
0-1-CT-S-X-I-NO-DTF8.5" 6151'
Bit #Bit Type Footage
4 5438'
Depth
73-27
API FLDensity (ppg)
out (sec/qt)
Viscosity
8.90 45 8.9
9.98 10.74MWD Summary
YP
Max
Ratio
Mud Data
96%
%
Total Charges:
Rig Activity:
256.0
Cor Solids
10.20
Avg Min
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
26-Feb-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)
Tools
2260
ROP
ROP (ft/hr)
Xceed675, Periscope675, Telescope675, Neoscope
4.23 @
Current Pump & Flow Data:
RIH t/ 5643'. Calibrate MWD tool. Continue RIH t/ 11250'. Wash t/ 11437'. Drill ahead f/ 11437 t/ TD @ 12391' MD.
Mud Type
FazePro
Casing
Summary
Lithology (%)
11
12190'
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
Circulate 3 BU, begin BROOH. Wash BHA through window. Continue BROOH t/ 5201'. Circulate 2 BU. TOOH on
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
27-Feb-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
10.0
- -MWD Summary
YP
Max
Ratio
Mud Data
Depth
73-27
API FLDensity (ppg)
out (sec/qt)
Viscosity
8.90 45
TFA Condition
1-1-CT-A-X-I-NO-TD8.5" 11438'
Bit #Bit Type Footage
5 953'
-Connection
0-1-CT-S-X-I-NO-DTF
42.00
Size
TOW 5626'BOW 5643'Hydril 563
42.00 4
-
C-3
Max Gas during BROOH: 110 units.
100% Gas In AirTrip
0
=10,000 Units
(max)
0
Background
Average
110
Mud (lb/bbl)ml/30min
3.252.50
4.0
RPM
N/A
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
6151'
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
15
(current)
Units*
Clyst
4 8.5"Smith MDSi616
Set At
0.902
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to -
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
elevators. L/D BHA #5.
-
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
J. FailingReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
80 - 130
120.0
5438'
Size
9 5/8"
Comments
Smith MDSi616
BROOH
11437'
13
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
.
.
*
24 hr Recap:
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
Prepare to run Liner
11437'
13
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
80 - 130
120.0
5438'
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
0
907-685-1490Unit Phone:
0
J. FailingReport By:
0 0
0 0
-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
Tag whipstock @ 5630'. Retrieve whipstock. TOOH t/ surface. L/D whipstock BHA. R/U casing tools. Prepare to run liner.
-
-
Alkal
Coal
Gallons/stroke
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Depth
-
Avg
to -
Current
--
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
4 8.5"Smith MDSi616
Set At
0.902
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
14
Oil / Water
Hours
0 0
Type
6151'
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl)ml/30min
2.862.20
4.0
RPM
N/A
Average
5
(max)
0
Background Trip
0
=10,000 Units-
C-3
100% Gas In Air-Connection
0-1-CT-S-X-I-NO-DTF
42.00
Size
TOW 5626'BOW 5643'Hydril 563
42.00 4
TFA Condition
1-1-CT-A-X-I-NO-TD8.5" 11438'
Bit #Bit Type Footage
5 953'
Depth
73-27
API FLDensity (ppg)
out (sec/qt)
Viscosity
8.90 45 8.9
- -MWD Summary
YP
Max
Ratio
Mud Data
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
28-Feb-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
L/D BHA #5. Slip and cut. M/U whipstock retrieval BHA. RIH t/ 1517'. Shallow hole test. Continue RIH.
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
Begin running 5.5" slotted liner f/ surface t/ 2469'. Troubleshoot skate. Service rig. Continue running liner t/ 5912'.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
1-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
8.9
- -MWD Summary
YP
Max
Ratio
Mud Data
Depth
73-27
API FLDensity (ppg)
out (sec/qt)
Viscosity
8.90 45
TFA Condition
1-1-CT-A-X-I-NO-TD8.5" 11438'
Bit #Bit Type Footage
5 953'
-Connection
0-1-CT-S-X-I-NO-DTF
42.00
Size
TOW 5626'BOW 5643'Hydril 563
42.00 4
-
C-3
100% Gas In AirTrip
0
=10,000 Units
(max)
0
Background
Average
0
Mud (lb/bbl)ml/30min
2.732.10
4.0
RPM
N/A
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
6151'
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
12
(current)
Units*
Clyst
4 8.5"Smith MDSi616
Set At
0.902
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to -
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
Run through window @ 5626'. Encounter obstruction @ 5912'. Work liner - no success. TOOH w/ liner t/ 4298'.
-
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
J. FailingReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
80 - 130
120.0
5438'
Size
9 5/8"
Comments
Smith MDSi616
TOOH w/ Liner
11437'
14
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
Continue TOOH w/ liner t/ surface. Test BOPs. R/D Testing equipment. P/U Cleanout BHA.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
2-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
9.9
- -MWD Summary
YP
Max
Ratio
Mud Data
Depth
73-27
API FLDensity (ppg)
out (sec/qt)
Viscosity
9.10 45
TFA Condition
1-1-CT-A-X-I-NO-TD8.5" 11438'
Bit #Bit Type Footage
5 953'
-Connection
0-1-CT-S-X-I-NO-DTF
42.00
Size
TOW 5626'BOW 5643'Hydril 563
42.00 4
-
C-3
No Trip Gas.
100% Gas In AirTrip
0
=10,000 Units
(max)
0
Background
Average
0
Mud (lb/bbl)ml/30min
2.471.90
4.0
RPM
N/A
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
6151'
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
14
(current)
Units*
Clyst
4 8.5"Smith MDSi616
Set At
0.902
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to -
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
-
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
J. FailingReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
80 - 130
120.0
5438'
Size
9 5/8"
Comments
Smith MDSi616
P/U Cleanout BHA
11437'
14
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
.
.
*
24 hr Recap:
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
Work pipe thru window
11437'
15
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
80 - 130
120.0
5438'
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
0
907-685-1490Unit Phone:
0
J. FailingReport By:
0 0
0 0
-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
enter window. Weight mud up to 9.1 ppg. POOH t/ 181'. Rearrange tools and M/U cleanout BHA. RIH t/ 5620'. Work BHA
-
-
Alkal
Coal
Gallons/stroke
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Depth
-
Avg
to -
Current
--
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
4 8.5"Smith MDSi616
Set At
0.902
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
14
Oil / Water
Hours
0 0
Type
6151'
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl)ml/30min
2.602.00
4.0
RPM
N/A
Average
129
(max)
0
Background Trip
0
=10,000 Units-
C-3
Max Trip Gas: 129 units
f/ 5620' t/ 5718' in attempt to clean out window.
100% Gas In Air-Connection
0-1-CT-S-X-I-NO-DTF
42.00
Size
TOW 5626'BOW 5643'Hydril 563
42.00 4
TFA Condition
1-1-CT-A-X-I-NO-TD8.5" 11438'
Bit #Bit Type Footage
5 953'
Depth
73-27
API FLDensity (ppg)
out (sec/qt)
Viscosity
9.10 47 9.9
- -MWD Summary
YP
Max
Ratio
Mud Data
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
3-Mar-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
P/U and M/U cleanout BHA. RIH t/ 5635'. Work pipe through tight spot f/ 5636 t/ 5718'. Orientate and attempt to
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
Attempt to run through window unsuccessful. POOH t/ surface. L/D BHA and rearrange to new BHA configuration.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
4-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
9.9
- -MWD Summary
YP
Max
Ratio
Mud Data
Depth
73-27
API FLDensity (ppg)
out (sec/qt)
Viscosity
9.10 47
TFA Condition
1-1-CT-A-X-I-NO-TD8.5" 11438'
Bit #Bit Type Footage
5 953'
-Connection
0-1-CT-S-X-I-NO-DTF
42.00
Size
TOW 5626'BOW 5643'Hydril 563
42.00 4
-
C-3
Max Trip Gas: 9 units
Work pipe f/ 5620-5718' through window. Continue working pipe through window.
100% Gas In AirTrip
0
=10,000 Units
(max)
0
Background
Average
9
Mud (lb/bbl)ml/30min
2.602.00
4.0
RPM
N/A
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
6151'
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
14
(current)
Units*
Clyst
4 8.5"Smith MDSi616
Set At
0.902
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to -
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
RIH t/ 5635'. Work tight spot f/ 5624-5718'. Circulate @ 6235'. TOOH t/ surface. L/D BHA. P/U BHA w/ 5.5" bent joint. RIH t/ 5620'.
-
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
J. FailingReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
80 - 130
120.0
5438'
Size
9 5/8"
Comments
Smith MDSi616
Work pipe thru window
11437'
15
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
.
.
*
24 hr Recap:
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
TOOH
11437'
13
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
80 - 130
120.0
5438'
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
0
907-685-1490Unit Phone:
0
J. FailingReport By:
0 0
0 0
-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
casing @ 5618'. Run through window again to establish open window. RIH t/ 5718' @ packer. Circ to top of packer for brine pill.
-
-
Alkal
Coal
Gallons/stroke
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Depth
-
Avg
to -
Current
--
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
4 8.5"Smith MDSi616
Set At
0.902
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
15
Oil / Water
Hours
0 0
Type
6151'
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl)ml/30min
2.602.00
4.0
RPM
N/A
Average
45
(max)
0
Background Trip
0
=10,000 Units-
C-3
Max Trip Gas: 45 units
Spot 30 bbl brine pill. TOOH t/ 1975'. Continue TOOH.
100% Gas In Air-Connection
0-1-CT-S-X-I-NO-DTF
42.00
Size
TOW 5626'BOW 5643'Hydril 563
42.00 4
TFA Condition
1-1-CT-A-X-I-NO-TD8.5" 11438'
Bit #Bit Type Footage
5 953'
Depth
76-24
API FLDensity (ppg)
out (sec/qt)
Viscosity
9.25 52 8.7
- -MWD Summary
YP
Max
Ratio
Mud Data
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
5-Mar-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
Work pipe through window - successful. Encounter tight spot @ 5780'. Work pipe f/ 5660' t/ 5907'. Pull back into
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
Trip out of hole with 5" drill pipe from 1975' MD to surface. Lay down BHA. Perform rig service. Slip and cut 59' line.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)Tools
Morning Report Report # 27
Customer:
Well:
Area:
Location:
Rig:
6-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
9.7
--MWD Summary
YP
Max
Ratio
Mud Data
Depth
75-25
HTHPDensity (ppg)
out (sec/qt)
Viscosity
9.15 53
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
-Connection
0-1-CT-S-X-I-NO-DTF
42.00
Size
TOW 5626'BOW 5643'Hydril 563
42.00 4
-
C-3
Max Trip Gas: 12 units
milling/whipstock BHA. Trip in hole with 5" drill pipe from 452' MD to 5531' MD. Currently orenting and setting whipstock.
100% Gas In AirTrip
0
=10,000 Units(max)
0
Background
Average
12
Mud (lb/bbl)ml/30min
3.252.50
4.0
RPM
5.4
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
6151'
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
13
(current)
Units*
Clyst
4 8.5"Smith MDSi616
Set At
0.902
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to-
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
Pick up milling BHA. Pick up and rack back 3 stands 5" HWDP. Pick up third party tools. Pick up whipstock assembly and make up
-
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
80 - 130
120.0
5438'
Size
9 5/8"
Comments
Smith MDSi616
Set whipstock
11437'
13
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
.
.
*
24 hr Recap:
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
TIH
14
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
120.0
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0 0
0 0
-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
surface. Lay down whipstock and BHA. Clean / clear rig floor. Rig service. Stage exceed directional BHA. Pick up BHA.
-
Max trip gas: 10 units.,
-
Alkal
Coal
Gallons/stroke
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Depth
-
Avg
to-
Current
--
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
6 8.5"Smith MDSi616
Set At
0.902
Weight
12391' 0.902
Flow In (spm)
47#L-80
Grade
16
Oil / Water
Hours
0 0
Type
6748'
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl)ml/30min
2.862.20
4.0
RPM
5.6
Average
10
(max)
0
Background Trip
0
=10,000 Units-
C-3
to 5120' MD. Work through windows. Surveys every 30' from 5636' MD to 5917' MD. Trip in hole to 6176' MD. Currently TIH.
Trip in hole from 271' MD to 1695' MD. Change out tools / elevators. Perform shallow hole test. Trip in hole from 1695' MD
100% Gas In Air-Connection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
Depth
73/279.30
HTHPDensity (ppg)
out (sec/qt)
Viscosity
9.30 52 9.8
--MWD Summary
YP
Max
Ratio
Mud Data
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
Morning Report Report # 28
Customer:
Well:
Area:
Location:
Rig:
7-Mar-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
Finish milling / polishing window area from 5626' MD to 5643' MD. Trip out of hole with 5" DP from 5905' MD to
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
Wash / ream from 6176' MD to 12391' MD. Circulate and condition the hole. Back ream out of hole at 400 gpm and
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)Tools
Morning Report Report # 29
Customer:
Well:
Area:
Location:
Rig:
8-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
11.0
--MWD Summary
YP
Max
Ratio
Mud Data
Depth
74/269.30
HTHPDensity (ppg)
out (sec/qt)
Viscosity
9.30 52
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
591Connection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
-
C-3
window.
100% Gas In AirTrip
0
=10,000 Units(max)
0
Background
Average
685
Mud (lb/bbl)ml/30min
2.732.10
4.0
RPM
6.2
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
6748'
Weight
12391' 0.902
Flow In (spm)
47.0 L-80
Grade
18
(current)
Units*
Clyst
6 8.5"Smith MDSi616
Set At
0.902
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to-
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
120 rpm from 12391' MD to 11060' MD. Trip out of hole through window at 100 gpm and not rotation. Trip out of hole through
-
Max trip gas: 685
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
120.0
Size
9 5/8"
Comments
Smith MDSi616
BROOH
14
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
.
.
*
24 hr Recap:
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
LD Whipstock
14
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
120.0
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0 0
0 0
-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
Back ream out of hole from 6269' MD to 5620' MD. Pump dry pill. Trip out of hole from 5620' MD to surface.
-
Max trip gas: 24
-
Alkal
Coal
Gallons/stroke
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Depth
-
Avg
to-
Current
--
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
6 8.5"Smith MDSi616
Set At
0.902
Weight
12391' 0.902
Flow In (spm)
47.0 L-80
Grade
18
Oil / Water
Hours
0 0
Type
6748'
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl)ml/30min
2.802.10
4.0
RPM
6.4
Average
24
(max)
0
Background Trip
0
=10,000 Units-
C-3
Perform shallow hole test. Trip in hole to 5619' MD. Retrieve whipstock assembly. Pump out of hole from 5619' MD to 4370' MD.
Lay down BHA. Clean / clear rig floor. Pick up whipstock retrieval BHA. Trip in hole from 2263' MD. Circulate / condition hole.
100% Gas In AirConnection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
Depth
74/269.40
HTHPDensity (ppg)
out (sec/qt)
Viscosity
9.40 54 9.8
--MWD Summary
YP
Max
Ratio
Mud Data
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
Morning Report Report # 30
Customer:
Well:
Area:
Location:
Rig:
9-Mar-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
Work through tight spot from 5700' MD to 5620' MD. Trip in hole from 5620' MD to 6269' MD.
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
Trip out of hole from 1884' MD to surface and lay down BHA. Pick up whipstock retrieval BHA.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)Tools
Morning Report Report # 31
Customer:
Well:
Area:
Location:
Rig:
10-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
10.7
--MWD Summary
YP
Max
Ratio
Mud Data
Depth
73/279.35
HTHPDensity (ppg)
out (sec/qt)
Viscosity
9.35 55
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
Connection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
-
C-3
Slip / cut 48' drill line. Pick up fishing BHA. Trip in hole to 5557' MD. Tag fish at 5592' MD. Caught fish and jar free. Currently TOOH.
whipstock retrieval BHA. Pull whipstock through floor, found safety disconnect was missing. Clean / clear rig floor.
100% Gas In AirTrip
0
=10,000 Units(max)
0
Background
Average
N/A
Mud (lb/bbl)ml/30min
3.122.40
4.0
RPM
7.4
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
6748'
Weight
12391' 0.902
Flow In (spm)
47.0 L-80
Grade
18
(current)
Units*
Clyst
6 8.5"Smith MDSi616
Set At
0.902
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to-
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
Trip in hole to 5624' MD. Tag whipstock at 5624' MD. Jar whipstock free. Trip out of hole from 5601' MD to 163' MD. Lay down
-
No significant trip gas
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
120.0
Size
9 5/8"
Comments
Smith MDSi616
TOOH
15
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Failing / Sinn
(max)(current)
.
.
*
24 hr Recap:
0
C-2
Logging Engineers:Hammes / Sinn
(max)(current)
TOOH
16
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
120.0
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0 0
0 0
-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
Perform rig maintenance. Pick up milling BHA. Trip in hole with 4.5" DP from 198' MD to 5525' MD. Trip in hole with 5" DP from
-
No significant trip gas
-
Alkal
Coal
Gallons/stroke
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Depth
-
Avg
to-
Current
--
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
6 8.5"Smith MDSi616
Set At
0.902
Weight
12391' 0.902
Flow In (spm)
47.0 L-80
Grade
17
Oil / Water
Hours
0 0
Type
6748'
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl)ml/30min
2.992.30
4.0
RPM
7.6
Average
N/A
(max)
0
Background Trip
0
=10,000 Units-
C-3
Trip out of hole sideways with 4.5" DP. Lay down 4.5" DP. Currently TOOH.
5525' MD to 5625' MD. Ream window area from 5624' MD to 5656' MD. Trip out of hole with 5" DP and rack back.
100% Gas In AirConnection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
Depth
73/279.35
HTHPDensity (ppg)
out (sec/qt)
Viscosity
9.35 56 10.7
--MWD Summary
YP
Max
Ratio
Mud Data
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
Morning Report Report # 32
Customer:
Well:
Area:
Location:
Rig:
11-Mar-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD
(ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
Trip out of hole with 5" DP from 5584' MD to surface. Lay down BHA. Clean / clear rig floor.
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
.
.
*
24 hr Recap:
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
Lay down 4.5" DP from 3149' MD to surface. Lay down BHA. Rig service. Pick up tools for 5.5" liner run.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD
(ppg)
Tools
Morning Report Report # 33
Customer:
Well:
Area:
Location:
Rig:
12-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
12.0
--MWD Summary
YP
Max
Ratio
Mud Data
Depth
73/279.35
HTHPDensity (ppg)
out (sec/qt)
Viscosity
9.35 56
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
Connection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
-
C-3
Change out swell packers that were already downhole per CoMan. Run in hole from 2170' MD to 4467' MD. Currently RIH liner.
100% Gas In AirTrip
0
=10,000 Units(max)
0
Background
Average
N/A
Mud (lb/bbl)ml/30min
3.122.40
4.0
RPM
7.4
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type
6748'
Weight
12391' 0.902
Flow In (spm)
47.0 L-80
Grade
16
(current)
Units*
Clyst
6 8.5"Smith MDSi616
Set At
0.902
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to-
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
Run in hole with 5.5" liner from surface to 1400' MD. Repair pipe skate. Run in hole from 1400' MD to 2170' MD.
-
No significant trip gas
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
120.0
Size
9 5/8"
Comments
Smith MDSi616
RIH Liner
14
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Hammes / Sinn
(max)(current)
.
.
*
24 hr Recap:
0
C-2
Logging Engineers:Hammes / Sinn
(max)(current)
TOOH
14
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
120.0
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0 0
0 0
9
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
ppg KCL brine at 9 bpm. Pump 50 bbls high viscosity citric acid spacer. Displace hole with 379 bbls brine. Observe clean brine
-
Maximum gas while displacing 9 units
-
Alkal
Coal
Gallons/stroke
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Depth
-
Avg
to-
Current
--
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
6 8.5"Smith MDSi616
Set At
0.902
Weight
12391' 0.902
Flow In (spm)
47.0 L-80
Grade
17
Oil / Water
Hours
0 0
Type
6748'
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl)ml/30min
2.992.30
4.0
RPM
7.4
Average
9
(max)
0
Background Trip
0
=10,000 Units-
C-3
back to surface. 520 bbls FazePro sent back to reserve storage. Currently TOOH sideways.
100% Gas In AirConnection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
Depth
73/279.35
HTHPDensity (ppg)
out (sec/qt)
Viscosity
9.35 53 10.7
--MWD Summary
YP
Max
Ratio
Mud Data
96%
%
Total Charges:
Rig Activity:
-
Cor Solids
-
Avg Min
Morning Report Report # 34
Customer:
Well:
Area:
Location:
Rig:
13-Mar-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD
(ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
Run in hole with 5.5" liner. Land liner at 5461' MD and liner shoe at 12385' MD.Displace from FazePro to 8.7
Mud Type
FazePro
Casing
Summary
Lithology (%)
-
12391'
.
.
*
24 hr Recap:
Mud Type
KCL Brine
Casing
Summary
Lithology (%)
-
12391'
Trip out of hole and lay down 5" drill pipe from 5140' MD to surface. Rig up for 4.5" tubing run. Make up pump
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD
(ppg)
Tools
Morning Report Report # 35
Customer:
Well:
Area:
Location:
Rig:
14-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
Avg Min
40000.0
--MWD Summary
YP
Max
Ratio
Mud Data
Depth
8.80
HTHPDensity (ppg)
out (sec/qt)
Viscosity
8.80 28
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
Connection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
-
C-3
100% Gas In AirTrip
0
=10,000 Units(max)
0
Background
Average
N/A
Mud (lb/bbl)ml/30min
4.0
RPM
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type Weight
12391' 0.902
Flow In (spm)
47.0 L-80
Grade
(current)
Units*
Clyst
Set At
Ss Cht Silt Siltst ShCly
Depth
-
Avg
to-
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
-
Alkal
Coal
Gallons/stroke
and motor assemblies. Hook up ESP cable. Currently rigging up 4.5" cable.
-
No significant gas
0
0 0N/A
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
120.0
Size
9 5/8"
Comments
Smith MDSi616
Run Completions
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
0
C-2
Logging Engineers:Hammes / Sinn
(max)(current)
.
.
*
24 hr Recap:
0
C-2
Logging Engineers:Hammes / Sinn
(max)(current)
Run Completions
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft2)
120.0
Size
9 5/8"
Comments
Smith MDSi616
Eni Petroleum
Nabors 245E
OP03-P05 L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901109264
0
907-685-1490Unit Phone:
0
C. SinnReport By:
0 0
0 0
N/A
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
5313' MD. Lay down 4.5" tubing tools from floor. Pick up landing joints and hanger. Cut and splice ESP cable. Prep to land
-
No significant gas
-
Alkal
Coal
Gallons/stroke
0
12391'
12391'
0'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Depth
-
Avg
to-
Current
--
Ss Cht Silt Siltst ShCly
(current)
Units*
Clyst
Set At Weight
12391' 0.902
Flow In (spm)
47.0 L-80
Grade
Oil / Water
Hours
0 0
Type
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl)ml/30min
4.0
RPM
Average
N/A
(max)
0
Background Trip
0
=10,000 Units-
C-3
4.5" tubing.
100% Gas In AirConnection
42.00
Size
TOW 5626'BOW 5643'Hydril 563
TFA Condition
1-1-CT-A-X-I-NO-TD8.5"11438'
Bit #Bit Type Footage
5 953'
Depth
8.75
HTHPDensity (ppg)
out (sec/qt)
Viscosity
8.75 27 40000.0
--MWD Summary
YP
Max
Ratio
Mud Data
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
Avg Min
Morning Report Report # 36
Customer:
Well:
Area:
Location:
Rig:
15-Mar-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD
(ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
Complete rig up for 4.5" tubing run. Pull ESP cable through shiv and splice. Run in hole with 4.5" tubing to
Mud Type
KCL Brine
Casing
Summary
Lithology (%)
-
12391'
WELL INFORMATION Created On : May 07 2014
Customer :Eni Petroleum
Well Name :OP03-P05L1
Job Number :AK-XX-0901109264
Rig Name :Nabors 245E
Field Name :Nikaitchuq
Country :USA
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
5553.27 71.67 4.47 3584.77 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
5626.00 72.38 0.37 3,607.22 69.10 N 2.92 E 69.06 5.45
5643.00 74.18 359.31 3,612.11 85.38 N 2.87 E 85.34 12.16
5717.37 75.54 358.76 3,631.54 157.16 N 1.66 E 157.12 1.96
5790.57 76.07 358.22 3,649.49 228.10 N 0.21 W 228.08 1.02
5828.37 78.53 357.95 3,657.80 264.95 N 1.44 W 264.95 6.55
5886.64 78.74 357.53 3,669.28 322.03 N 3.70 W 322.05 0.79
5917.57 80.15 358.07 3,674.95 352.42 N 4.86 W 352.45 4.87
6013.52 86.94 358.10 3,685.73 447.65 N 8.05 W 447.71 7.08
6109.30 86.94 356.05 3,690.84 543.16 N 12.93 W 543.28 2.14
6205.23 87.51 351.58 3,695.49 638.40 N 23.25 W 638.64 4.69
6301.19 88.80 351.23 3,698.58 733.23 N 37.58 W 733.65 1.39
6395.94 89.25 350.57 3,700.19 826.77 N 52.57 W 827.38 0.84
6491.64 89.34 349.87 3,701.37 921.07 N 68.82 W 921.89 0.74
6587.38 88.72 350.36 3,702.99 1,015.38 N 85.26 W 1016.40 0.83
6683.11 87.26 350.45 3,706.34 1,109.71 N 101.20 W 1110.93 1.53
6778.85 87.70 350.61 3,710.55 1,204.05 N 116.94 W 1205.47 0.49
6874.70 89.15 351.82 3,713.19 1,298.74 N 131.57 W 1300.34 1.97
6970.61 89.36 352.91 3,714.44 1,393.79 N 144.31 W 1395.54 1.16
7066.36 88.24 352.58 3,716.44 1,488.75 N 156.40 W 1490.65 1.22
7161.13 86.27 353.78 3,720.98 1,582.73 N 167.64 W 1584.78 2.43
7258.51 84.64 354.70 3,728.70 1,679.31 N 177.39 W 1681.48 1.92
7353.52 85.83 357.08 3,736.59 1,773.74 N 184.17 W 1775.99 2.79
7448.90 84.23 359.28 3,744.85 1,868.71 N 187.19 W 1870.98 2.84
7545.06 83.02 2.38 3,755.53 1,964.25 N 185.81 W 1966.50 3.44
7640.82 86.34 5.06 3,764.41 2,059.37 N 179.62 W 2061.53 4.45
7736.58 86.07 6.26 3,770.75 2,154.45 N 170.19 W 2156.48 1.28
7832.40 81.99 6.26 3,780.71 2,249.17 N 159.80 W 2251.05 4.26
7928.50 78.51 6.84 3,796.99 2,343.24 N 149.01 W 2344.98 3.67
8024.14 80.97 6.02 3,814.02 2,436.76 N 138.47 W 2438.35 2.71
8119.91 83.27 4.38 3,827.15 2,531.22 N 129.88 W 2532.70 2.94
8215.54 87.37 4.08 3,834.95 2,626.25 N 122.85 W 2627.63 4.30
INSITE V8.0.20 Page 1Job No:AK-XX-0901109264 Well Name:OP03-P05L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
8310.72 87.45 3.40 3,839.25 2,721.13 N 116.65 W 2722.42 0.72
8406.47 91.30 3.03 3,840.30 2,816.71 N 111.28 W 2817.92 4.04
8502.35 92.42 4.01 3,837.18 2,912.35 N 105.39 W 2913.48 1.55
8598.09 93.26 4.53 3,832.44 3,007.71 N 98.27 W 3008.73 1.03
8693.73 90.70 2.94 3,829.14 3,103.08 N 92.05 W 3104.01 3.15
8789.66 86.99 0.57 3,831.07 3,198.92 N 89.11 W 3199.81 4.59
8885.60 88.94 0.48 3,834.48 3,294.79 N 88.23 W 3295.66 2.03
8981.38 90.04 359.12 3,835.33 3,390.56 N 88.57 W 3391.43 1.83
9077.11 90.98 359.23 3,834.48 3,486.28 N 89.95 W 3487.15 0.99
9172.85 89.59 357.09 3,834.00 3,581.96 N 93.02 W 3582.87 2.67
9268.63 88.37 355.61 3,835.71 3,677.53 N 99.12 W 3678.50 2.00
9364.66 86.85 354.10 3,839.71 3,773.08 N 107.72 W 3774.16 2.23
9460.72 86.56 354.96 3,845.23 3,868.54 N 116.86 W 3869.74 0.94
9556.22 86.26 357.71 3,851.21 3,963.65 N 122.95 W 3964.92 2.89
9651.90 86.46 1.07 3,857.29 4,059.12 N 123.97 W 4060.39 3.51
9747.39 86.87 0.71 3,862.84 4,154.44 N 122.49 W 4155.68 0.57
9843.25 87.35 359.83 3,867.68 4,250.17 N 122.04 W 4251.40 1.04
9939.09 89.23 358.47 3,870.54 4,345.95 N 123.46 W 4347.19 2.42
10035.00 91.46 358.80 3,869.96 4,441.83 N 125.75 W 4443.09 2.35
10130.56 92.80 358.27 3,866.41 4,537.29 N 128.19 W 4538.57 1.51
10226.72 90.64 358.19 3,863.52 4,633.35 N 131.16 W 4634.67 2.25
10321.97 90.16 357.82 3,862.86 4,728.54 N 134.47 W 4729.89 0.64
10417.71 88.15 357.65 3,864.27 4,824.19 N 138.25 W 4825.58 2.11
10513.39 87.92 359.07 3,867.55 4,919.77 N 140.99 W 4921.19 1.50
10609.31 88.00 1.36 3,870.97 5,015.63 N 140.63 W 5017.03 2.39
10705.28 87.19 2.81 3,874.99 5,111.44 N 137.14 W 5112.80 1.73
10801.45 89.00 2.98 3,878.19 5,207.43 N 132.29 W 5208.71 1.89
10897.08 88.74 0.89 3,880.08 5,302.99 N 129.06 W 5304.22 2.20
10992.97 86.81 359.70 3,883.80 5,398.80 N 128.57 W 5400.01 2.36
11088.90 86.79 359.93 3,889.15 5,494.58 N 128.88 W 5495.79 0.24
11184.69 87.94 0.40 3,893.56 5,590.26 N 128.60 W 5591.46 1.30
11280.47 87.17 359.83 3,897.64 5,685.95 N 128.41 W 5687.14 1.00
11376.45 88.30 359.95 3,901.44 5,781.86 N 128.59 W 5783.04 1.18
11471.81 87.98 1.15 3,904.53 5,877.16 N 127.68 W 5878.32 1.30
11567.35 86.59 2.60 3,909.06 5,972.54 N 124.56 W 5973.65 2.10
11663.16 87.58 2.42 3,913.93 6,068.13 N 120.37 W 6069.18 1.05
11759.24 88.36 3.23 3,917.33 6,164.03 N 115.63 W 6165.02 1.17
11855.07 88.83 5.79 3,919.68 6,259.53 N 108.10 W 6260.41 2.72
11950.98 88.32 5.16 3,922.07 6,354.97 N 98.95 W 6355.72 0.84
12047.32 88.42 2.63 3,924.81 6,451.04 N 92.41 W 6451.70 2.63
12142.60 88.37 2.77 3,927.48 6,546.18 N 87.92 W 6546.77 0.16
12238.54 87.65 0.20 3,930.81 6,642.02 N 85.44 W 6642.57 2.78
12328.82 89.39 358.38 3,933.14 6,732.26 N 86.56 W 6732.81 2.79
12391.00 89.39 358.38 3,933.80 6,794.41 N 88.32 W 6794.98 0.00
INSITE V8.0.20 Page 2Job No:AK-XX-0901109264 Well Name:OP03-P05L1 Survey Report
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (Grid)
- A total correction of 0.00 deg from Magnetic north to Grid north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 12,391.00 feet is 6,794.98 feet along 359.26 degrees (Grid)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.20 Page 3Job No:AK-XX-0901109264 Well Name:OP03-P05L1 Survey Report