Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-193
Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Nabors 245
Date: April 12, 2014
Surface Data Logging
End of Well Report
OP18-08L1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. Formation Tops
5. Mud Record
6. Bit Record
7. Morning Reports
8. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: ENI Petroleum
Rig: Nabors 245
Well: OP18-08L1
Field: Nikaitchuq Project
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-029-23449-60-00
Sperry Job Number: AK-XX-0901202813
Job Start Date: 17 March 2014
Spud Date: 26 March 2014
Total Depth: 18899’ MD, 3427’ TVD
North Reference: True
Declination: 19.443°
Dip Angle: 81.024°
Total Field Strength: 57624.148 nT
Date Of Magnetic Data: 10 March 2014
Wellhead Coordinates N: North 70° 30' 39.32"
Wellhead Coordinates W: West 149° 51' 50.41"
Drill Floor Elevation 53.15’
Ground Elevation: 12.20’
Permanent Datum: Mean Sea Level
SDL Engineers: Charles Sinn / Josiah Failing / Leif Hammes
Company Geologist: Andrew Buchanan
Company Representatives: Bruce Simonson / Ben Perry
SSDS Unit Number: 121
DAILY SUMMARY
03/17/2014
Finish moving rig over new well. Hook up all interconnects. Lay Herculite. Transfer 8.8 ppg brine
into pits. Shear top valve. Bullhead 35 bbls 8.8 ppg brine down tubing at 5 bpm. Bullhead 756
bbls brine down annulus at 10 bpm. Monitor well and verify killed. Nipple down tree. Set riser
and prep for BOP install. Currently nipple up / down.
03/18/2014
Finish nippling up BOPs. PSI Test BOPs with 4.5" and 5" DP. Rig up 3rd party tools to pull
tubing. Pull hanger and pull out of hole with 4.5" tubing from 9810' MD to 9530' MD. Currently
pull tubing.
03/19/2014
Pulled 4.5" tubing. Perform rig service. Rig up wireline. Run in hole with wireline to pull pump.
Currently pull pump.
03/20/2014
Complete pulling pump with wireline. Lay down pump and rig down wireline. Pull out of hole with
4.5" tubing Lay down pump assembly and tubing tools. Rig service. Load Scraper BHA into
shed. Pick up BHA and makeup cleanout assembly. Currently TIH for cleanout run.
03/21/2014
Trip in hole with singles for cleanout run. Clean and polish liner top per Baker rep. Trip out of
hole from 12814' MD to 3718' MD. Strap out of hole and rack stands in derrick. Currently
tripping out of hole.
03/22/2014
Trip out of hole to 422' MD. Lay down scraper BHA. Pick up isolation packer assembly. Trip in
hole to 12814' MD. Set packer at 12794' MD. PSI test packer to 500 psi for 10 mins. Slip and
cut. Currently trip out of hole.
03/23/2014
Trip out of hole to surface. Lay down BHA. Rig up wireline, Run in hole with wireline for USIT
logs. Tag packer at 12780' MD. Pull out of hole while logging to surface. Rig down wireline.
Make up fishing BHA. Prepare to fish.
03/24/2014
Finish making up fishing BHA. Trip in hole to 12700' MD. Tag fish @ 12794' MD. Rig up to
reverse circulate. Reverse circulate down annulus. Rig down reverse circulate. Trip out of hole
to surface. Lay down BHA with fish. Rig up to PSI test BOPs. Test BOPs.
03/25/2014
Continue testing BOPs. Test good. Lay down testing equipment. Service rig. Make up
whipstock BHA. Run in hole to 2053' MD. Perform shallow hole test. Test good. Continue run in
hole to 12395' MD with whipstock BHA. Spot pill and pump 50 bbls OBM. Continue run in hole.
Gas: Displacement gas of1691 units while spotting 50 bbl OBM pill and pumping.
03/26/2014
Continue run in hole to 12795' MD. Set whipstock. Shear off bottom of window at 12754'.
Displace to OBM. Mill window from 12737’ MD to 12776' MD. Pump fiber sweep to surface. Rig
up and attempt to perform leak off test. Rig down test manifold. Monitor well, losing at 15
bbls/hr. Run in hole to 12754' MD, pump 50 ppb LCM pill. Spot at 12754' MD. Monitor loss
rates at 9 bbls/hr. Make/spot second LCM Pill.
Gas: Max gas during displacement of production brine to OBM was 7484 units.
03/27/2014
Continue mixing second LCM pill. Monitor well and losses. Spot pill @ 12754' MD. Monitor
well. Continued losses at 13-8 bbls/hr. M/U third 50 bbl LCM pill. Pump and spot @ 12754'
MD. Trip out of hole to 12396' MD. Monitor well. Loss rates at 16 bbls/hr. Circulate and
condition mud. Pump dry job. Trip out of hole.
03/28/2014
Trip out of hole to surface. Lay down milling BHA. Clean rig floor. Make up mud motor BHA.
Trip in hole to 3301' MD. Perform shallow hole test. Continue trip in hole to 8000' MD. Slip and
cut. Continue trip in hole to 11354' MD.
Gas: No significant trip gas
03/29/2014
Continue trip in hole 12775' MD. Slide/rotate drilling to 13024' MD. Back ream out of hole to
12832' MD. Pull through window at 12737' MD. Continue back ream out of hole to 11438' MD.
Lay down 30 joints HWDP. Continue Back ream out of hole to 8757' MD.
Gas: There was a max gas of 508 units from 13023’ MD with an average gas of 162 units.
03/30/2014
Continue back ream out of hole to 6000' MD. Pump dry job. Trip out of hole on elevators to
surface. Lay down BHA #1. Pick up and make up Xceed BHA #2. Trip in hole 1500' MD.
Perform shallow hole test - good. Trip in hole to 5230' MD. Fill pipe every 2000' MD. Continue
trip in hole.
Gas: No trip gas
03/31/2014
Continue trip in hole to 12676' MD. Wash down to 13024' MD. Drill ahead, rotating from 13024'
MD to 13825' MD.
Gas: There was a max gas of 748 units from 13766’ MD with an average gas of 480 units.
04/01/2014
Continue rotary drilling from 13825' MD to 15642' MD. Continue drilling ahead.
Gas: There was a max gas of 852 units from 14711’ MD with an average gas of 496 units.
04/02/2014
Continue rotary drilling ahead from 15642' MD to 17365' MD. Continue drilling ahead.
Gas: There was a max gas of 706 units from 15766’ MD with an average gas of 351 units.
04/03/2014
Continue rotary drilling ahead from 17365' to production TD at 18899' MD. Begin BROOH from
18899' MD to 18323' MD. Continue back ream out of hole.
Gas: There was a max gas of 890 units from 18201’ MD with an average gas of 563 units.
04/04/2014
Continue BROOH to 14303' MD at 440 GPM, 120 RPM. Continue BROOH to 12754' MD. Pull
through window, no rotating. Tight spot at 12772' MD. Work through. There was 10-15 klbs
over pull. BROOH to 8275' MD. Continue BROOH at 440 GPM.
Gas: There was a max gas while reaming of 65 units.
04/05/2014
Finish BROOH. Pump bottoms up @ 8275' MD. Pump dry job. Trip out of hole on elevators to
surface. Lay down BHA. Pick up and make up whipstock retrieval BHA. Trip in hole to 1981'
MD. Perform shallow hole test - good. PSI spike after test, blow pop off. Reset attempt at same
rates. Trip out of hole to surface, inspect tool, nothing found. Change out and test tool. Trip in
hole to 1981' MD. Perform shallow hole test - good. Perform H2S drill. Slip and cut. Service rig.
Trip in hole to 4841' MD. Continue trip in hole.
Gas: There was a max gas while reaming of 15 units.
04/06/2014
Continue trip in hole to 12737' MD. Fill pipe every 2500'. Circulate and wash down pump.
Hook groove on whipstock, latch up, sheer anchor, hit jars three times to unseat. Service top
drive. Trip out of hole to 8168' MD. Pump dry job. Continue trip out of hole to surface. Lay
down whipstrock retrieval BHA.
Gas: There was a max gas while tripping of 12 units.
04/07/2014
Lay down whipstock retrieval BHA. Service rig. Test BOPs. Rig down testing equipment.
Make up hanger BHA. Prep floor. Run 5.5" liner from surface to 6323'. Change elevators to 5".
Make up Liner hanger.
Gas: No trip gas
04/08/2014
Continue make up liner hanger. Change elevators. Trip in hole with 5.5" liner on 4.5" and 5"
drill pipe. Rotate from 17000’ MD to 18899' MD. Pick up, breakout, drop and pump ball. Set
hanger at 12525' MD. Test to 1500 psi for 15 mins. Trip out of hole to 12465' MD. Displace to
production brine. Lay down Drill pipe.
Gas: Max gas while displacing to production brine was 15 units
04/09/2014
Lay down 5" drill pipe to 6230' MD. Trip in hole with 4.5" drill pipe to 7990' MD. Circulate and
condition mud - pump citric pill. Service top drive. Trip in hole to 9700' MD. Circulate and
condition mud - pump bottoms up. Continue lay down drill pipe to surface. Lay down liner
running BHA. Make up mule on 5" drill pipe. Trip in hole to 2660' MD. Pump citric pill to flush
OBM from pipe. Blow down top drive. Continue lay down 5" drill pipe.
Gas: Max gas while circulating: 6 units
04/10/2014
Lay down 5” drill pipe from 2600’ MD to surface. Install / remove wear bushing. Clean rig floor.
Make up shroud and pump assemblies, set pump.
04/11/2014
Pick up, lay down and make up tools. Run in hole ESP with 4.5” tubing testing cable every
1000’. Pipe skate failure. Perform repairs. Continue run in hole with 4.5” tubing from 6138’ MD
to 7301’ MD.
11000
12000
13000
14000
15000
16000
17000
18000
19000
20000
0 5 10 15 20 25 30
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
WELL NAME: OP18-08L1
OPERATOR: Eni Petroleum
MUD CO: MI Swaco
RIG: Nabors 245
SPERRY JOB: AK-XX-0901202813
Days vs. Depth
17 March 2014
Sperry SDL Remains on Location
from Previous Well
LOCATION: Oliktok Point
AREA: Nikaitchuq Field
STATE: Alaska
SPUD: 26-Mar-2014
TD: 3-Apr-2014
Mill Window through Casing (Spud)
On Bot: 05:40 26 Mar 2014
Commenced 8.75" Production
Hole Section
On Bot: 04:45 29 Mar 2014
TD Production Section
18899' MD, 3427' TVD
Off Bot: 17:52 03 Apr 2014
WELL NAME:OP18-08L1 LOCATION:Oliktok Point
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:26-Mar-2014
SPERRY JOB:AK-XX-0901202813 TD:3-Apr-2014
Marker MD INC AZ TVD TVDSS
8 1/2" Production Section
TOW 12,737.0 85.3 295.0 3,480.0 -3,480.0
BOW 12,754.0 85.3 294.1 3,481.4 -3,481.4
OA-Sand Top 12,828.0 86.7 290.7 3,487.2 -3,487.2
OA-2 14,367.0 90.2 292.6 3,464.9 -3,464.9
OA-3 14,520.0 88.2 292.1 3,467.6 -3,467.6
OA-3 15,870.0 94.1 305.9 3,445.9 -3,445.9
Fault 1 16,186.0 91.0 306.9 3,435.9 -3,435.9
OA-Sand Top 16,493.0 89.2 310.5 3,434.5 -3,434.5
OA-Sand Top 16,593.0 87.7 310.4 3,437.0 -3,437.0
Fault 2 16,857.0 87.9 310.1 3,450.8 -3,450.8
OA-Sand Bottom 17,043.0 95.2 311.0 3,445.6 -3,445.6
OA-4 17,100.0 96.8 311.2 3,439.7 -3,439.7
OA-3 17,182.0 95.9 312.5 3,430.4 -3,430.4
OA-2 17,312.0 91.6 313.9 3,421.8 -3,421.8
Fault 3 18,373.0 90.9 310.4 3,428.4 -3,428.4
OA-2 18,474.0 91.4 309.8 3,426.1 -3,426.1
TD 8 3/4" Borehole 18,899.0 90.0 309.7 3,427.9 -3,427.9
Formation Tops
OP18-08L1
Eni Petroleum
MI Swaco
Nabors 245
AK-XX-0901202813
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/R
6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime
Emul
Stab Sand Chlorides
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts %mg/L
17-Mar 12814 8.80 27 ------------44500 Nipple up / Down
18-Mar 12814 8.80 27 ------------53000 POOH w/ 4.5" tubing
19-Mar 12814 8.80 27 ------------53000 Pull pump w/ wireline
20-Mar 12814 8.80 27 ------------54000 Trip in hole with scraper
21-Mar 12814 8.80 27 ------------54000 Trip out of hole with cleanout
22-Mar 12814 8.80 27 ------------54000 Trip out of hole
23-Mar 12814 8.80 27 ------------54000 Prepare to fish
24-Mar 12814 8.80 27 ------------55000 Testins BOPs
25-Mar 12814 8.80 27 ------------55000 Run in hole with Whipstock BHA
26-Mar 12775 8.90 45 13 14 6/6/7 N/A 40/27/23/17/7/6 N/A 8.6 64.0 1.80 2.34 590.0 0.1 38000 Mixing 2nd LCM pilll
27-Mar 12775 8.70 45 11 13 5/5/6 N/A 35/24/19/14/6/5 N/A 7.8 66.0 1.90 2.47 574.0 0.1 38000 Pull out of hole
28-Mar 12775 8.70 45 11 12 5/5/6 N/A 34/23/18/13/6/5 N/A 7.0 64.0 2.10 2.73 550.0 0.1 30500 Run in hole with BHA #1
29-Mar 13024 8.70 44 11 15 6/6/7 4.4 37/26/21/16/7/6 N/A 8.0 64.0 2.20 2.86 608.0 0.1 29000 Back ream out of hole 8.75" hole L1
30-Mar 13024 8.65 45 11 12 6/6/7 4.8 34/23/18/13/6/5 NA/1 7.87 64.0 1.9 2.47 670 0.1 29000 Run in hole with BHA #2
31-Mar 13531 8.7 45 11 16 6/6/7 6.2 38/27/22/17/7/6 NA/1 6.85 66 1.9 2.47 660 0.1 32000 Drill 8.7" hole L1
1-Apr 15413 8.7 44 12 14 5/6/6 5.6 38/26/21/16/7/6 NA/1 8.96 66 1.9 2.47 740 0.1 29000 Drill 8.7" hole L1
2-Apr 17118 8.75 45 14 16 7/7/8 5.2 44/30/24/18/8/7 NA/1 8.98 65 1.6 2.08 623 0.1 29000 Drill 8.7" hole L1
3-Apr 18899 8.7 47 12 17 7/7/8 4.2 41/29/24/18/8/7 NA/1 8.85 64 1.7 2.21 540 0.1 32000 Back ream out of hole
4-Apr 18899 8.7 47 12 17 7/7/8 4.2 41/29/24/18/8/7 NA/1 8.85 64 1.7 2.21 540 0.1 32000 Back ream out of hole
5-Apr 18899 8.75 47 11 15 6/6/7 4.8 37/26/21/16/7/6 NA/1 8.95 64 1.9 2.47 637 0.1 33000 Run in hole with whipstock retrieval tool
6-Apr 18899 8.8 51 11 19 7/7/8 5.0 41/30/25/19/8/7 NA/1 8.76 64 1.9 2.47 640 0.1 34000 Lay down retrieval tool
Casing Record
STATE:Alaska
RIG:SPUD:26-Mar-2014
SPERRY JOB:TD:3-Apr-2014
9.625" Casing BOW @ 12754' MD, 3481' TVD
Remarks
20" Conductor @ 160' MD, 160' TVD
5.5" Liner @ 18899' MD, 3427' TVD
WELL NAME:LOCATION:Olikok Point
OPERATOR:AREA:Nikaitchuq Field
MUD CO:
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit
Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
-200 1 Milled Tooth XR+9 12737 12775 38 7.7 0.746 5 63 104 2250 500 1-1-WT-A-E-I-NO-BHA Mill Window
1 300 1 RR Milled Tooth XR+8.75 12775 13024 249 2.90 0.746 86.8 10 40 2400 450 1-1-WT-A-E-I-NO-BHA TD Production Build Section
2 400 2 SKH616M 8.75 13024 18899 5875 42.40 0.902 138.7 10 120 2500 440 1-0-CT-C-X-I-NO-TD TD Production Section
WELL NAME:OP18-08L1 LOCATION:Oliktok Point
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:
SPERRY JOB:AK-XX-0901202813 TD:3-Apr-2014
MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:26-Mar-2014
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:Finish moving rig over new well. Hook up all incerconnects. Lay Herculite. Transfer 8.8 ppg brine into pits.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
44500.00
0
17-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
OP18-08-L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.80
Size
No gas readings
Monitor well and verify killed. Nipple down tree. Set riser and prep for BOP install. Nipple up / down at report time.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901202813
Nipple up / down
PV
Footage
Perry / Ruminer
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
Shear top valve. Bullhead 35 bbls 8.8 ppg brine down tubing at 5 bpm. Bullhead 756 bbls brine down annulus at 10 bpm.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / L. Hammes
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / L. Hammes
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
Pull hanger and pull out of hole 4.5" tubing from 9810' MD to 9530' MD. Currently pulling tubing.
12814'
12814'
0'
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Ruminer
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901202813
Pull tubing
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No gas readings
ConditionBit #
8.80
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
OP18-08-L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
18-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
44500.00
Finish nippling up BOPs. PSI Test BOPs with 4.5" and 5" DP. Rig up 3rd party tools to pull tubing.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Pulled 4.5" tubing. Perform rig service. Rig up wireline. Run in hole with wireline to pull pump. Currently pull pump..
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
44500.00
0
19-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
OP18-08-L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.80
Size
No significant gas
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901202813
Pull pump with wireline
PV
Footage
Perry / Ruminer
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
12814'
12814'
0'
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / L. Hammes
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / L. Hammes
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
Lay down pump assembly and tubing tools. Rig service. Load Scraper BHA into shed. Pick up BHA and makeup cleanout
12814'
12814'
0'
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901202813
TIH Scraper Run
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No significant gas
assembly. Currently TIH for cleanout run.
ConditionBit #
8.80
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
OP18-08-L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
20-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
44500.00
Complete pulling pump with wireline. Lay down pump and rig down wireline. Pull out of hole with 4.5" tubing
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Trip in hole with singles for cleanout run. Clean and polish liner top per Baker rep. Trip out of hole from
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
44500.00
0
21-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
OP18-08-L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.80
Size
No significant gas
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-901202813
TOOH with Scraper
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
12814'
12814'
0'
Max @ ft Current
Date:
Time:
12814' MD to 3718' MD. Strap out of hole and rack stands in derrick. Currently tripping out of hole.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / L. Hammes
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
Mud Type
KCL Brine
Casing
Summary
Lithology (%)
-
12391'
TOOH t/ 422'. L/D scraper BHA. P/U isolation packer assembly. TIH t/ 12814'. Set packer @ 12794' MD. PSI test
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
22-Mar-2014
12:00 AM
Job No.:
Daily Charges:
AK-AM-0901202813
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
Avg Min
54000.0
- -MWD Summary
YP
Max
Ratio
Mud Data
Depth
8.80
HTHP Density (ppg)
out (sec/qt)
Viscosity
27
TFA Condition Bit # Bit Type Footage
Connection
Size
-
C-3
No Trip Gas
100% Gas In Air Trip
0
=10,000 Units
(max)
0
Background
Average
N/A
Mud (lb/bbl) ml/30min
RPM
Lst
0
00
C-4i
00
C-4n
0
Cement
C-1 C-5i
Chromatograph (ppm)
Oil / Water
Hours
0 0
Type Weight
Flow In (spm)
Grade
(current)
Units*
Clyst
Set At
Ss Cht Silt Siltst Sh Cly
Depth
-
Avg
to -
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
0
12814'
12814'
0'
Lime
Tuff Gvl
C-5n
-
Alkal
Coal
Gallons/stroke
packer t/ 500 psi for 10 mins. Slip and cut. TOOH.
-
0
0 0-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
0
907-685-1490 Unit Phone:
0
J. Failing Report By:
0
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
Size Comments
TOOH
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
0
C-2
Logging Engineers: Failing / Hammes
(max) (current)
.
.
*
24 hr Recap:
Logging Engineers: Failing / Hammes
(max) (current)
0
C-2
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size Comments
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
Prepare to fish
0
907-685-1490 Unit Phone:
0
J. Failing Report By:
0 0
0 0
-
Minimum
Depth
Maximum
in
Gas Summary
0
0 0
logging t/ surface. R/D wireline. M/U fishing BHA. Prepare to fish.
-
C-5n
-
Alkal
Coal
Gallons/stroke
0
12814'
12814'
0'
Lime
Tuff Gvl
-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
Sh Cly
Depth
-
Avg
to -
Current
-
Units*
Clyst
Set At
Ss
Flow In (spm)
Grade
(current)
Cht Silt
Weight
Oil / Water
Hours
0 0
Type
Siltst Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i
00
C-4n
0
Lst
0
Mud (lb/bbl) ml/30min
RPM
Average
N/A
0
Background Trip
0
=10,000 Units
No Trip Gas
100% Gas In Air
(max)
Size Bit # Bit Type Footage
Connection -
C-3
27
TFA Condition
Mud Data
Depth
8.80
HTHP Density (ppg)
out (sec/qt)
Viscosity
Min
54000.0
- -MWD Summary
YP
Max
Ratio
AK-AM-0901202813
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
Avg
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
23-Mar-2014
12:00 AM
Job No.:
Daily Charges:
24 hr Max
ECD (ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
TOOH to surface. L/D BHA. R/U wireline, RIH w/ wireline for USIT logs. Tag packer @ 12780' MD. POOH while
Mud Type
KCL Brine
Casing
Summary
Lithology (%)
-
12391'
.
.
*
24 hr Recap:
Mud Type
KCL Brine
Casing
Summary
Lithology (%)
-
12814'
Finish M/U fishing BHA. TIH t/ 12700'. Tag fish @ 12794' MD. R/U to reverse circulate. Reverse circulate down
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data: 24 hr Max
ECD (ppg)
Tools
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
24-Mar-2014
12:00 AM
Job No.:
Daily Charges:
Ratio
AK-AM-0901202813
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
- - -MWD Summary
YP
Max Avg
Mud Data
Depth
8.80
HTHP Density (ppg)
out (sec/qt)
Viscosity
27
TFA Condition
55000.0
Bit # Bit Type Footage
Connection -
C-3
Size
No Trip Gas
100% Gas In Air
(max)
Trip
0
=10,000 Units
0
Background
Average
N/A
ml/30min
RPM
0
00
C-4n
0
Lst
Chromatograph (ppm)
00
C-4i
Siltst Cement
C-1 C-5i
Oil / Water
Hours
0 0
Type Weight Grade
(current)
Cht Silt
Units*
Clyst
Set At
Ss
Depth
-
Avg
to -
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Max @ ft
-
Date:
Time:
12814'
12814'
0'
Lime
Tuff Gvl
Mud (lb/bbl)
Min
-
Alkal
Coal
Gallons/stroke
Sh Cly
Flow In (spm)
C-5n
0
annulus. R/D reverse circulate. TOOH t/ surface. L/D BHA w/ fish. R/U to PSI test BOPs. Test BOPs.
-
Gas Summary
0
0 0
0
-
Minimum
Depth
Maximum
in
Report By:
0 0
0
Testing BOPs
0
907-685-1490 Unit Phone:
0
J. Failing
Comments
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Logging Engineers: Failing / Hammes
(max) (current)
0
C-2
.
.
*
24 hr Recap:
Mud Type
KCL Brine
Casing
Summary
Lithology (%)
-
12814'
Continue testing BOPs. Test good. L/D testing equipment. Service rig. M/U whipstock BHA. RIH t/ 2053' MD.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
ECD (ppg)
Tools
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
25-Mar-2014
12:00 AM
Job No.:
Daily Charges:
AK-AM-0901202813
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
- -MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
out (sec/qt)
Viscosity
27
Ratio
54000.0
Size
Depth
8.80
Connection -
C-3
TFA Bit # Bit Type Footage
(max)
Grade
=10,000 Units
Trip Gas/Displacement Gas: 1691 units while spotting 50 bbl OBM pill and pumping.
100% Gas In Air Trip
00
Background
Average
1691
ml/30min
RPM Condition
C-1
0
Cement
C-5i C-4n
0
Chromatograph (ppm)
00
C-4i
00
Oil / Water
Hours
0 0
Type Weight
Gas Summary
Cht Silt Lst Siltst Clyst
Set At
Ss
(current)
-
Current
--
Units*
Max @ ft
-
Date:
Time:
-
-
Avg
to
Min
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Cly
Flow In (spm)
Comments
12814'
12814'
0'
Lime
Tuff Gvl
0
Alkal
Coal Sh
Mud (lb/bbl)
C-5n
Perform shallow hole test. Test good. Continue RIH t/ 12395' w/ whipstock BHA. Spot pill, pump 50 bbls OBM. Continue RIH.
-
0
0 0
0
-
Minimum
Depth
Maximum
in
Report By:
0 0
0
TIH w/ HWDP
0
907-685-1490 Unit Phone:
0
J. Failing
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
PV
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
Logging Engineers: Failing / Hammes
(max) (current)
0
C-2
.
.
*
24 hr Recap:
Failing / Hammes
(max) (current)
14
C-2
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
907-685-1490 Unit Phone:
0
J. Failing Logging Engineers: Report By:
0 0
16
Minimum
Depth
Maximum
in
0
0
9
12750'
24
PV
12745'
0
0
Pump fiber sweep t/ surface. R/U and attempt to perform leak off test. R/D test manifold. Monitor well, losing ~15 bbls/hr. RIH t/
3
Tuff Gvl
0
Alkal
Coal Sh
Mud
40#
Comments
12737'
12775'
38'
Lime
(lb/bbl)
Min
Yesterday's Depth:
Current Depth:
24 Hour Progress:
121
SPP (psi)
Date:
Time:
511
12775'
Avg
to
Flow In (spm)
Spotting LCM Pill
12737'
Current
13.4 -
Units*
Max @ ft
12773'
Clyst
Set At
Ss
(current)
Cht Silt Lst Siltst Cly
0 0
Type Weight
Gas Summary
9 5/8"
Milled Tooth XR+
Oil / Water
Hours
0.746
00
C-4i
00
C-5n
Cement
C-5i C-4n
0
Chromatograph (ppm)
Condition
C-1
0
1.80
RPM
N/A 14
Average
7484 Trip
00
Max gas during displacement of production brine to OBM: 7484 units.
12754', pump 50 ppb LCM pill. Spot @ 12754'. Monitor loss rates @ ~9 bbls/hr. Make/spot second LCM Pill.
100% Gas In Air Background
Grade
=10,000 Units
(max)
TOW @ 12737'BOW @ 12754'Hydril 563 L-80
-Connection 1
C-3
TFA
8.75 12737'
Bit #
13 38000.0
Size
Depth
73-27 8.90
Bit Type Footage
ml/30min
2.34
out (sec/qt)
Viscosity
45
Ratio
- -MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
AK-AM-0901202813
96%
mg/L
Total Charges:
Rig Activity:
80.0
Chlorides
-
24 hr Max
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
26-Mar-2014
12:00 AM
Job No.:
Daily Charges:
ECD (ppg)
Tools
2210
ROP
ROP (ft/hr)
Telescope 675
4.23 @
Current Pump & Flow Data:
Continue RIH t/ 12795'. Set whipstock. Shear off BOW @ 12754'. Displace to OBM. Mill window f/ 12737-12776' MD.
Mud Type
FazePro OBM
Casing
Summary
Lithology (%)
1
12735'
1
.
.
*
24 hr Recap:
FazePro
Casing
Summary
Lithology (%)
-
12735'
1
Continue mixing second LCM pill. Monitor well and losses. Spot pill @ 12754' MD. Monitor well. Continued losses
-
ROP
ROP (ft/hr)
Telescope 675
4.23 @
Current Pump & Flow Data:
ECD (ppg)
Tools
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
27-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
(sec/qt)
Viscosity
45
Ratio
-
33000.0
Size
Depth
72-28 8.70
Bit Type Footage
ml/30min
2.47
out
-
C-3
TFA
8.75 12737'
Bit #
(max)
TOW @ 12737'BOW @ 12754'Hydril 563 L-80
-=10,000 Units Connection
Max trip gas: 7 units
Circulate and condition mud. Pump dry job. TOOH.
100% Gas In Air Background Trip
00Average
7
1.90
RPM
N/A 13 11
C-1
0
Grade
Cement
C-5i C-4n
0
Chromatograph (ppm)
00
C-4i
00
C-5n
Milled Tooth XR+
Oil / Water
Hours
0.746
0 0
Type Weight
Gas Summary
9 5/8"
Cht Silt Lst Siltst Cly
Max @ ft
-
Clyst
Set At
Avg
to
Flow In (spm)
TOOH
12737'
Current
--
Min
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Date:
Time:
-
40#
Comments
12775'
12775'
0'
Lime
(lb/bbl)
Tuff Gvl
0
Alkal
Coal Sh
Mud
at 13-8 bbls/hr. M/U third 50 bbl LCM pill. Pump and spot @ 12754' MD. TOOH t/ 12396'. Monitor well. Loss rates @ 16 bbls/hr.
-
-
0
0 0
0
-
-
0
PV
Minimum
Depth
Maximum
in
Units*
Ss
(current)
Mud Type
Report By:
0 0
0
907-685-1490 Unit Phone:
0
J. Failing Logging Engineers:
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
AK-AM-0901202813
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
12775'
Condition
Failing / Hammes
(max) (current)
0
C-2
cP
.
.
*
24 hr Recap:
Failing / Hammes
(max) (current)
0
C-2
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
12775'
Condition
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
AK-AM-0901202813
907-685-1490 Unit Phone:
0
J. Failing Logging Engineers: Report By:
0 0
0
Depth
Maximum
in
Units*
Ss
(current)
Mud Type
0
0
-
-
0
PV
-
0
0
Continue TIH t/ 8000'. Slip and cut. Continue TIH t/ 11354'.
-
Tuff Gvl
0
Alkal
Coal Sh
Mud
40#
Comments
12775'
12775'
0'
Lime
(lb/bbl)
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Date:
Time:
-
Avg
to
Flow In (spm)
TOOH
12775'
Current
--
Max @ ft
-
Clyst
Set At
Cht Silt Lst Siltst Cly
0 0
Type Weight
Gas Summary
9 5/8"
Milled Tooth XR+
Oil / Water
Hours
0.746
00
C-4i
00
C-5n
Cement
C-5i C-4n
0
Chromatograph (ppm)
C-1
0
Grade
RPM
N/A 12 11
Average
0Trip
00
Max trip gas: 0 units
100% Gas In Air Background =10,000 Units Connection
(max)
TOW @ 12737'BOW @ 12754'Hydril 563 L-80
--
C-3
TFA
8.75 12737'
Bit # Size
Depth
70-30 8.70
Bit Type Footage
out (sec/qt)
Viscosity
45
Ratio
-
30500.0
ml/30min
2.73 2.10
MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
28-Mar-2014
12:00 AM
Job No.:
Daily Charges:
ECD (ppg)
Tools
-
ROP
ROP (ft/hr)
XP Motor 1.5, Telescope 675, MI Swaco Well Commander
4.23 @
Current Pump & Flow Data:
TOOH t/ surface. L/D milling BHA. Clean rig floor. M/U mud motor BHA. TIH t/ 3301' MD. Perform shallow hole test.
FazePro
Casing
Summary
Lithology (%)
-
12775'
1
Minimum
.
.
*
24 hr Recap:
Casing
Summary
Lithology (%)
3
12775'
1
Minimum
Continue TIH t/ 12775' MD. Slide/rotate drilling t/ 13024'. BROOH t/ 12832'. Pull through window @ 12737'.
2390
ROP
ROP (ft/hr)
XP Motor 1.5, Telescope 675, MI Swaco Well Commander
4.23 @
Current Pump & Flow Data:
ECD (ppg)
Tools
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
29-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
482.0
Chlorides
-
24 hr Max
-MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
44
Ratio
-
29000.0
ml/30min
2.86 2.20 70-30 8.75
Bit Type Footage
out (sec/qt)
FazePro
-
C-3
TFA
8.75 12737'
Bit #
(max)
TOW @ 12737'BOW @ 12754'Hydril 563 L-80
-=10,000 Units Connection
Max Trip Gas: 39 units
Max Gas: 508 units
100% Gas In Air Background Trip
30 89 Average
39
RPM
N/A 15
248'
11
C-1
125
Grade
Cement
C-5i C-4n
14
Chromatograph (ppm)
631
C-4i
00
C-5n
Milled Tooth XR+
Oil / Water
Hours
13023' 0.746
366 239
Type Weight
Gas Summary
9 5/8"
Cht Silt Lst Siltst Cly
Max @ ft
12854'
Clyst
Set At
Avg
to
Flow In (spm)
BROOH
12775'
Current
133.6 -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
108
SPP (psi)
Date:
Time:
445
40#
Comments
12775'
13024'
249'
Lime
(lb/bbl)
Tuff Gvl
0
Alkal
Coal Sh
Mud
Continue BROOH t/ 11438'. L/D 30 jts HWDP. Continue BROOH t/ 8757'.
162
13023'
0
121 58
58
508
12963'
52793
PV
Depth
Maximum
in
Units*
Ss
(current)
Mud Type
Size
Depth
Report By:
0 0
13933
907-685-1490 Unit Phone:
27
J. Failing Logging Engineers:
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
AK-AM-0901202813
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
12775'
Condition
Failing / Hammes
(max) (current)
76
C-2
cP
.
.
*
24 hr Recap:
Failing / Hammes
(max) (current)
0
C-2
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
13024'
Condition
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
AK-AM-0901202813
907-685-1490 Unit Phone:
0
J. Failing Logging Engineers: Report By:
0 0
0
Maximum
in
Units*
Ss
(current)
Mud Type Depth
0
0
-
-
0
PV
-
0
0
#2. TIH t/ 1500'. Perform shallow hole test - good. TIH t/ 5230' MD. Fill pipe every 2000'. Continue TIH.
-
Tuff Gvl
0
Alkal
Coal Sh
Mud
40#
Comments
13024'
13024'
0'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Date:
Time:
-
Avg
to
Flow In (spm)
TIH
13024'
Current
--
Max @ ft
-
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Cht Silt Lst Siltst Cly
0 0
Type Weight
Gas Summary
9 5/8"
SKH616M
13024'
Oil / Water
Hours
0.902
249'
00
C-4i
00
C-5n
Cement
C-5i C-4n
0
Chromatograph (ppm)
C-1
0
Grade
RPM
N/A 12 11
Average
0Trip
00
No Trip Gas
100% Gas In Air Background =10,000 Units Connection
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
--
C-3
TFA
8.75 13024'
12737'
Bit #
8.65
Bit Type Footage
out (sec/qt)
FazePro
Size
45
Ratio
-
31500.0
ml/30min
2.47 1.90 70-30
MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
30-Mar-2014
12:00 AM
Job No.:
Daily Charges:
ECD (ppg)
Tools
-
ROP
ROP (ft/hr)
Xceed675, PeriScope675,TeleScope675, Neoscope
4.23 @
Current Pump & Flow Data:
Continue BROOH t/ 6000' MD. Pump dry job. TOOH on elevators t/ surface. L/D BHA #1. P/U and M/U Xceed BHA
Casing
Summary
Lithology (%)
-
13024'
2
Minimum
Depth
.
.
*
24 hr Recap:
Casing
Summary
Lithology (%)
3
13531'
2
Minimum
Depth
Continue TIH t/ 12676' MD. Wash down t/ 13024' MD. Drill ahead, rotating f/ 13024' t/ 13825' MD.
2120
ROP
ROP (ft/hr)
Xceed675, PeriScope675,TeleScope675, Neoscope
4.23 @
Current Pump & Flow Data:
ECD (ppg)
Tools
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
31-Mar-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
243.4
Chlorides
10.26
24 hr Max
10.50 MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
9.69
32000.0
ml/30min
2.47 1.90 72-28 8.70
Bit Type Footage
out (sec/qt)
FazePro
Size
45
Ratio
123
C-3
TFA
8.75 13024'
12737'
Bit #
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
-=10,000 Units Connection
No Trip Gas
Max Gas: 748 units
100% Gas In Air Background Trip
124 341 Average
0
RPM
N/A 16 11
C-1
226
Grade
Cement
C-5i C-4n
63
Chromatograph (ppm)
30 125
C-4i
00
C-5n
SKH616M
13024'
Oil / Water
Hours
0.902
249'
594 419
Type Weight
Gas Summary
9 5/8"
Cht Silt Lst Siltst Cly
Max @ ft
13068'
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Avg
to
Flow In (spm)
Drill Ahead
13024'
Current
176.6 243.0
Yesterday's Depth:
Current Depth:
24 Hour Progress:
108
SPP (psi)
Date:
Time:
452
40#
Comments
13024'
13825'
801'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Tuff Gvl
0
Alkal
Coal Sh
Mud
480
13766'
0
223 113
237
748
Mult
80799
PV
Maximum
in
Units*
Ss
(current)
Mud Type Depth
Report By:
0 0
47811
907-685-1490 Unit Phone:
54
J. Failing Logging Engineers:
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Simonson / Sherman Report For:
AK-AM-0901202813
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
13024'
Condition
Failing / Hammes
(max) (current)
19
C-2
cP
.
.
*
24 hr Recap:
Failing / Hammes
(max) (current)
46
C-2
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
15642'
Condition
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman Report For:
AK-AM-0901202813
907-685-1490 Unit Phone:
85
J. Failing Logging Engineers: Report By:
0 0
45925
Maximum
in
Units*
Ss
(current)
Mud Type Depth
167
309
852
Mult
88189
PV
14711'
0
303
496
Tuff Gvl
0
Alkal
Coal Sh
Mud
40#
Comments
13825'
15642'
1817'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Yesterday's Depth:
Current Depth:
24 Hour Progress:
102
SPP (psi)
Date:
Time:
445
Avg
to
Flow In (spm)
Drill Ahead
13024'
Current
165.8 5.0
Max @ ft
14024'
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Cht Silt Lst Siltst Cly
711 517
Type Weight
Gas Summary
9 5/8"
SKH616M
13024'
Oil / Water
Hours
0.902
249'
61 204
C-4i
20
C-5n
Cement
C-5i C-4n
122
Chromatograph (ppm)
C-1
291
Grade
1-15k
RPM
N/A
100-120
14 12
Average
-Trip
200 384
Multiple 0 values for total gas due to frequent MWD downlinking/cycling of pumps.
100% Gas In Air Background =10,000 Units Connection
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
-113
C-3
TFA
8.75 13024'
12737'
Bit #
8.70
Bit Type Footage
out (sec/qt)
FazePro
Size
44
Ratio
10.14
29000.0
ml/30min
2.47 1.90 73-27
MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
96%
mg/L
Total Charges:
Rig Activity:
235.3
Chlorides
10.41
24 hr Max
10.59
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
1-Apr-2014
12:00 AM
Job No.:
Daily Charges:
ECD (ppg)
Tools
2150
ROP
ROP (ft/hr)
Xceed675, PeriScope675,TeleScope675, Neoscope
4.23 @
Current Pump & Flow Data:
Continue rotary drilling f/ 13825' t/ 15642'. Continue drilling ahead.
Casing
Summary
Lithology (%)
0
15413'
2
Minimum
Depth
.
.
*
24 hr Recap:
Casing
Summary
Lithology (%)
0
17118'
2
Minimum
Depth
Continue rotary drilling ahead f/ 15642' t/ 17365' MD. Continue drilling ahead.
2370
ROP
ROP (ft/hr)
Xceed675, PeriScope675,TeleScope675, Neoscope
4.23 @
Current Pump & Flow Data:
ECD (ppg)
Tools
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
2-Apr-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
237.7
Chlorides
10.75
24 hr Max
11.29 MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
10.32
32000.0
ml/30min
2.08 1.60 71-29 8.75
Bit Type Footage
out (sec/qt)
FazePro
Size
45
Ratio
65
C-3
TFA
8.75 13024'
12737'
Bit #
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
-=10,000 Units Connection
Multiple 0 values for total gas due to frequent MWD downlinking/cycling of pumps.
100% Gas In Air Background Trip
165 290 Average
-
1-15k
RPM
N/A
100-120
16 14
C-1
270
Grade
Cement
C-5i C-4n
109
Chromatograph (ppm)
60 167
C-4i
00
C-5n
SKH616M
13024'
Oil / Water
Hours
0.902
249'
659 508
Type Weight
Gas Summary
9 5/8"
Cht Silt Lst Siltst Cly
Max @ ft
16701'
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Avg
to
Flow In (spm)
Drill Ahead
13024'
Current
161.7 118.0
Yesterday's Depth:
Current Depth:
24 Hour Progress:
106
SPP (psi)
Date:
Time:
440
40#
Comments
15642'
17365'
1723'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Tuff Gvl
0
Alkal
Coal Sh
Mud
351
15766'
0
296 169
243
706
Mult
72757
PV
Maximum
in
Units*
Ss
(current)
Mud Type Depth
Report By:
0 0
31846
907-685-1490 Unit Phone:
91
J. Failing Logging Engineers:
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman Report For:
AK-AM-0901202813
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
17365'
Condition
Failing / Hammes
(max) (current)
28
C-2
cP
.
.
*
24 hr Recap:
Failing / Sinn
(max) (current)
112
C-2
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
18899'
Condition
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman Report For:
AK-AM-0901202813
907-685-1490 Unit Phone:
74
J. Failing Logging Engineers: Report By:
0 3
54167
Maximum
in
Units*
Ss
(current)
Mud Type Depth
165
269
890
17529'
89449
PV
18201'
6
250
Continue BROOH.
563
Tuff Gvl
0
Alkal
Coal Sh
Mud
40#
Comments
17365'
18899'
1534'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Yesterday's Depth:
Current Depth:
24 Hour Progress:
103
SPP (psi)
Date:
Time:
430
Avg
to
Flow In (spm)
BROOH
13024'
Current
166.0 -
Max @ ft
17756'
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Cht Silt Lst Siltst Cly
616 402
Type Weight
Gas Summary
9 5/8"
SKH616M
13024'
Oil / Water
Hours
0.902
249'
58 181
C-4i
53
C-5n
Cement
C-5i C-4n
123
Chromatograph (ppm)
C-1
246
Grade
1-15k
RPM
N/A
100-120
17 12
Average
-Trip
179 393
100% Gas In Air Background =10,000 Units Connection
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
-128
C-3
TFA
8.75 13024'
12737'
Bit #
8.70
Bit Type Footage
out (sec/qt)
FazePro
Size
47
Ratio
10.81
32000.0
ml/30min
2.21 1.70 71-29
MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
96%
mg/L
Total Charges:
Rig Activity:
237.0
Chlorides
11.27
24 hr Max
11.48
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
3-Apr-2014
12:00 AM
Job No.:
Daily Charges:
ECD (ppg)
Tools
2270
ROP
ROP (ft/hr)
Xceed675, PeriScope675,TeleScope675, Neoscope
4.23 @
Current Pump & Flow Data:
Continue rotary drilling ahead f/ 17365' t/ production TD @ 18899' MD. Begin BROOH f/ 18899' t/ 18323' MD.
Casing
Summary
Lithology (%)
16
18899'
2
Minimum
Depth
.
.
*
24 hr Recap:
Casing
Summary
Lithology (%)
-
18899'
2
Minimum
Depth
Continue BROOH t/ 14303' @ 440 GPM, 120 RPM. Continue BROOH t/ 12754'. Pull through window, no rotating.
1550
ROP
ROP (ft/hr)
Xceed675, PeriScope675,TeleScope675, Neoscope
4.23 @
Current Pump & Flow Data:
ECD (ppg)
Tools
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
4-Apr-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
-
33000.0
ml/30min
2.34 1.80 71-29 8.75
Bit Type Footage
out (sec/qt)
FazePro
Size
47
Ratio
-
C-3
TFA
8.75 13024'
12737'
Bit #
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
-=10,000 Units Connection
Max Gas while reaming: 65 units
100% Gas In Air Background Trip
00Average
65
1-15k
RPM
N/A
100-120
15 11
C-1
0
Grade
Cement
C-5i C-4n
0
Chromatograph (ppm)
00
C-4i
00
C-5n
SKH616M
13024'
Oil / Water
Hours
0.902
249'
0 0
Type Weight
Gas Summary
9 5/8"
Cht Silt Lst Siltst Cly
Max @ ft
-
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Avg
to
Flow In (spm)
BROOH
13024'
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
98
SPP (psi)
Date:
Time:
430
40#
Comments
17365'
18899'
1534'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Tuff Gvl
0
Alkal
Coal Sh
Mud
Tight spot @ 12772' MD. Work through. 10-15 klbs over pull. BROOH t/ 8275'. Continue BROOH @ 440 GPM.
-
-
0
0 0
0
-
-
0
PV
Maximum
in
Units*
Ss
(current)
Mud Type Depth
Report By:
0 0
0
907-685-1490 Unit Phone:
0
J. Failing Logging Engineers:
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman Report For:
AK-AM-0901202813
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
18899'
Condition
Failing / Sinn
(max) (current)
0
C-2
cP
.
.
*
24 hr Recap:
Max Gas while reaming: 15 units
No Trip Gas
Failing / Sinn
(max) (current)
0
C-2
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
Condition
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman Report For:
AK-AM-0901202813
907-685-1490 Unit Phone:
0
J. Failing Logging Engineers: Report By:
0 0
0
Maximum
in
Units*
Ss
(current)
Mud Type Depth
0
0
-
-
0
PV
-
0
0
M/U whipstock retrieval BHA. TIH t/ 1981'. Perform shallow hole test - good. PSI spike after test, blow pop off. Reset attempt @
-
Tuff Gvl
0
Alkal
Coal Sh
Mud
40#
Comments
18899'
18899'
0'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Yesterday's Depth:
Current Depth:
24 Hour Progress:
98
SPP (psi)
Date:
Time:
430
Avg
to
Flow In (spm)
TIH for whipstock
Current
--
Max @ ft
-
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Cht Silt Lst Siltst Cly
0 0
Type Weight
Gas Summary
9 5/8"
Hycalog SKH616M
13024'
Oil / Water
Hours
18899' 0.902
249'
42.40
00
C-4i
00
C-5n
Cement
C-5i C-4n
0
Chromatograph (ppm)
1-0-CT-C-X-I-NO-TD
C-1
0
Grade
10.0
RPM
N/A
120.0
15
5875'
11
Average
15 Trip
00
Perform H2S drill. Slip and cut. Service rig. TIH t/ 4841'. Continue TIH.
same rates. TOOH t/ surface, inspect tool, nothing found. Change out and test tool. TIH t/ 1981'. Perform shallow hole test - good.
100% Gas In Air Background =10,000 Units Connection
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
--
C-3
TFA
8.75 13024'
12737'
Bit #
8.75
Bit Type Footage
out (sec/qt)
FazePro
Size
47
Ratio
-
33000.0
ml/30min
2.47 1.90 71-29
MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
5-Apr-2014
12:00 AM
Job No.:
Daily Charges:
ECD (ppg)
Tools
1550
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
Finish BROOH. Pump bottoms up @ 8275' MD. Pump dry job. TOOH on elevators t/ surface. L/D BHA. P/U and
Casing
Summary
Lithology (%)
-
18899'
2
Minimum
Depth
.
.
*
24 hr Recap:
Casing
Summary
Lithology (%)
-
18899'
2
Minimum
Depth
Continue TIH t/ 12737' MD. Fill pipe every 2500'. Circulate and wash down pump. Hook groove on whipstock,
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
ECD (ppg)
Tools
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
6-Apr-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
-
34000.0
ml/30min
2.47 1.90 71-29 8.80
Bit Type Footage
out (sec/qt)
FazePro
Size
51
TFA
8.75 13024'
12737'
Bit #
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
-10,000 Units Connection -
Max gas during trip: 12 units
L/D whipstrock retrieval BHA.
100% Gas In Air Background =Trip
00Average
12
10.0
RPM
N/A
120.0
19
5875'
11
1-0-CT-C-X-I-NO-TD
C-1
0
Grade
0
Chromatograph (ppm)
C-3
0
C-5n
Cement
C-5i C-4n
249'
42.40
00
C-4i
0
13024'
Oil / Water
Hours
18899' 0.902
Ratio
0
Type Weight
Gas Summary
9 5/8"
Cht Silt Lst Siltst Cly
Max @ ft
-
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Avg
to
Flow In (spm)
L/D Whipstock BHA
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Date:
Time:
-
40#
Comments
18899'
18899'
0'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Tuff Gvl
0
Alkal
Coal Sh
Mud
latch up, sheer anchor, hit jars three times to unseat. Service top drive. TOOH t/ 8168'. Pump dry job. Continue TOOH t/ surface.
-
0-
0
0 0
0
-
-
0
PV
Maximum
in
Units*
Ss
(current)
Mud Type Depth
Hycalog SKH616M
Report By:
0 0
0
907-685-1490 Unit Phone:
0
J. Failing Logging Engineers:
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman Report For:
AK-AM-0901202813
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
Condition
Failing / Sinn
(max) (current)
0
C-2
cP
.
.
*
24 hr Recap:
0
C-2
cP
Flow In (gpm)
Depth in / out WOB
(lb/100ft 2)
Size
Gallons/stroke
Condition
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / Sherman Report For:
AK-AM-0901202813
907-685-1490 Unit Phone:
0
J. Failing Logging Engineers:
0
0
(current)
Mud Type Depth
Hycalog SKH616M
Report By:
0
Failing / Sinn
(max) (current)
0
-
-
0
PV
in
-
0
0
Run 5.5" liner g/ surface t/ 6323'. Change elevators to 5". M/U Liner hanger.
-
0
Tuff Gvl
0
Alkal
Coal Sh
Mud
40#
Comments
18899'
18899'
0'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Date:
Time:
-
Avg
to
Flow In (spm)
M/U Liner Hanger
Current
--
Max @ ft
-
Clyst
1 8.75 Milled Tooth XR+
Set At
0.746
Cht Silt Lst Siltst Cly Ss
0
Type Weight
Gas Summary
9 5/8"
00
C-4i
0
0
Cement
C-5i C-4n
249'
42.40
13024'
18899'
0
Chromatograph (ppm)
C-3
0
C-5n
1-0-CT-C-X-I-NO-TD
C-1
0
Grade
10.0
RPM
N/A
120.0
20
5875'
11
Average
0Trip
00
No Trip Gas
100% Gas In Air Background =10,000 Units Connection -
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
-
TFA
8.75 13024'
12737'
Bit # Hours
0.902
Maximum
Units*
8.80
Bit Type Footage
out (sec/qt)
FazePro
Size
52
-
33000.0
ml/30min
2.34 1.80 71-29
Oil / Water
Ratio
MWD Summary
YP
Max Avg
Mud Data
Depth
HTHP Density (ppg)
Min
Viscosity
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
7-Apr-2014
12:00 AM
Job No.:
Daily Charges:
ECD (ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
L/D whipstock retrieval BHA. Service rig. Test BOPs. R/D testing equipment. M/U linger hanger BHA. Prep floor.
Casing
Summary
Lithology (%)
-
18899'
2
Minimum
Depth
.
.
*
24 hr Recap:
18899'
2
Minimum
Depth
Continue M/U liner hanger. Change elevators. TIH w/ 5.5" liner on 4.5" and 5" drill pipe. Rotate f/ 17000-18899'.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
ECD (ppg)
Tools
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
8-Apr-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-MWD Summary
YP
MaxAvg
Mud Data
Depth
HTHPDensity (ppg)
Min
Viscosity
-
45000.0
ml/30min
Oil / Water
Ratio
Footage
out (sec/qt)
KCL Brine
Size
27
Maximum
Units*
8.70
Bit Type
Casing
Summary
Lithology (%)
-
TFA
8.75 13024'
12737'
Bit # Hours
0.902
(max)
TOW @ 12737'BOW @ 12754'Hydril 563
2.90 10 40
L-80
-10,000 UnitsConnection-
Max gas while displacing to production brine: 15 units
brine. L/D Drill pipe.
100% Gas In AirBackground=15Trip
0
120.05875'
Average 0
0
0
Chromatograph (ppm)
C-3
0
C-5nC-4n
249'
42.40
13024'
18899'
C-1
Grade
10.0
0
C-4i
0
0
C-5i
Weight
Gas Summary
9 5/8"
CementCht Silt LstSiltst ClySs
Max @ ft
-
Clyst
1 8.75Milled Tooth XR+
Set At
0.746
Avg
to
Flow In (spm)
L/D drill pipe
Current
--
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Date:
Time:
-
40#
Comments
18899'
18899'
0'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
TuffGvl
0
Alkal
CoalSh
Mud
P/U, breakout, drop and pump ball. Set hanger @ 12525' MD. Test t/ 1500 psi for 15 mins. TOOH t/ 12465'. Displace t/ production
-
0-
0
00
00
-
-
0
PV
in
(current)
Mud TypeDepth
Hycalog SKH616M
Report By:
0
Failing / Sinn
(max)(current)
0
0
907-685-1490Unit Phone:
0
J. FailingLogging Engineers:
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901202813
(lb/100ft2)
Size
Gallons/stroke
Condition
Type
1-0-CT-C-X-I-NO-TD
RPM
0
C-2
cP
Flow In (gpm)
Depth in / out WOB
.
.
*
24 hr Recap:
C-2
cP
Flow In (gpm)
Depth in / out WOB
Size
Gallons/stroke
Condition
Type
1-0-CT-C-X-I-NO-TD
RPM
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901202813
0
J. FailingLogging Engineers:
0
907-685-1490Unit Phone:
0
(current)
Mud TypeDepth
Hycalog SKH616M
Report By:
0
Failing / Sinn
(max)(current)
0
-
-
0
PV
in
-
0
00
0
0
drive. TIH t/ 9700'. Circulate and condition mud - pump bottoms up. Continue L/D drill pipe t/ surface. L/D liner running BHA.
-
0
Sh
Mud(lb/100ft2)
TuffGvl
0
Alkal
Coal
18899'
18899'
0'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Date:
Time:
-
Avg
to
Flow In (spm)
L/D drill pipe
Current
--
Max @ ft
-
Clyst
1 8.75Milled Tooth XR+
Set At
0.746
CementCht Silt LstSiltst Cly
C-5i
Gas Summary
42.40
13024'
18899'
C-1
Grade
10.0
C-4iC-3
0
C-5nC-4n
0
00
0
Chromatograph (ppm)
120.05875'
Average 0
Trip
0 0
Max gas while circulating: 6 units
M/U mule on 5" drill pipe. TIH t/ 2660'. Pump citric pill t/ flush OBM f/ pipe. Blow down top drive. Continue L/D 5" drill pipe.
100% Gas In AirBackground=-10,000 UnitsConnection
BOW @ 12754'Hydril 563
2.90 10 40
L-80
249'
Weight
40#
Comments
13024'
12737'
Bit # Hours
0.902
(max)
TOW @ 12737'
- 6
8.70
Bit Type
Casing
Summary
Lithology (%)
-
8.75
Footage
out (sec/qt)
KCL Brine
Size
27
TFA
-
45000.0
ml/30min
Oil / Water
Ratio
MWD Summary
YP
MaxAvg
Mud Data
Depth
HTHPDensity (ppg)
Min
Viscosity
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
9-Apr-2014
12:00 AM
Job No.:
Daily Charges:
ECD (ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
L/D 5" drill pipe t/ 6230'. TIH w/ 4.5" drill pipe t/ 7990'. Circulate and condition mud - pump citric pill. Service top
18899'
2
Minimum
Depth
Maximum
Units*
9 5/8"
Ss
.
.
*
24 hr Recap:
18899'
2
Minimum
Depth
Maximum
Units*
9 5/8"
Ss
Lay down 5" drill pipe from 2660' MD to surface. Install and remove wear bushing. Clean rig floor. Service rig.
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
ECD
(ppg)
Tools
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
10-Apr-2014
12:00 AM
Job No.:
Daily Charges:
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-
MaxAvg
Mud Data
Depth
HTHPDensity (ppg)
Min
Viscosity
-
45000.0
ml/30min
Oil / Water
Ratio
YP
Footage
out (sec/qt)
KCL Brine
Size
27
TFA
8.70
Bit Type
Casing
Summary
Lithology (%)
-
8.75 13024'
12737'
Bit # Hours
0.902
(max)
TOW @ 12737'
-N/A
BOW @ 12754'Hydril 563
2.90 10 40
L-80
249'
Weight
40#
Comments
Connection
No significant gas
100% Gas In AirBackground=Trip
0 0
-10,000 Units
120.05875'
Average 0
0
0
Chromatograph (ppm)
C-3
0
C-5nC-4n
0
0
42.40
13024'
18899'
C-1
Grade
10.0
C-4i
Gas Summary
Cht Silt LstSiltstCly
1 8.75Milled Tooth XR+
Set At
0.746
Current
--
Max @ ft
-
MWD Summary
Date:
Time:
-
Avg
to
Flow In (spm)
RIH ESP
18899'
18899'
0'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0
Alkal
CoalClyst Cement
(lb/100ft2)
TuffGvl
-
Make up shroud and pump assemblies. Set pump. Test tools. Pull test tools. Make up pump.
-
0-
0
00
0
0
0
-
-
0
PV
in
(current)
Mud TypeDepth
Hycalog SKH616M
Report By:
0
Failing / Sinn
(max)(current)
0
907-685-1490Unit Phone:
0
0
C. SinnLogging Engineers:
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901202813
Size
Gallons/stroke
Condition
Type
1-0-CT-C-X-I-NO-TD
RPM
Mud
C-2
cP
Flow In (gpm)
Depth in / out WOB
Sh
SPP (psi)
C-5i
.
.
*
24 hr Recap:
Flow In (gpm)
Depth in / out WOB
Sh
SPP (psi)
C-5i
Condition
Type
1-0-CT-C-X-I-NO-TD
RPM
MudcP
Eni Petroleum
Nabors 245E
OP18-08L1
Nikaitchuq Field
Oliktok Point
Perry / RuminerReport For:
AK-AM-0901202813
Logging Engineers:
C-2
907-685-1490Unit Phone:
0
C. Sinn
(current)
Mud TypeDepth
Hycalog SKH616M
Report By:
0
Failing / Sinn
(max)(current)
0
-
-
0
PV
in
-
0
00
0
0
Make up shroud and pump assemblies. Set pumps. Test tools. Pull test tools. Make up pump.
-
0
(lb/100ft2)
TuffGvl
-
0
Alkal
CoalClyst Cement
18899'
18899'
0'
Lime
(lb/bbl)
1-1-WT-A-E-I-NO-BHA
Yesterday's Depth:
Current Depth:
24 Hour Progress:
MWD Summary
Date:
Time:
-
Avg
to
Flow In (spm)
RIH ESP Pump
Gallons/stroke
Current
--
Max @ ft
-
1 8.75Milled Tooth XR+
Set At
0.746
Size
LstSiltstCly
Gas Summary
Cht Silt
42.40
13024'
18899'
C-1
Grade
10.0
C-4iC-3
0
C-5nC-4n
0
0 00
0
Chromatograph (ppm)
120.05875'
Average 0 0 0
-10,000 Units
Max gas while circulating: 8 units
100% Gas In AirBackground=ConnectionTrip
0
BOW @ 12754'Hydril 563
2.90 10 40
L-80
249'
Weight
40#
Comments
13024'
12737'
Bit # Hours
0.902
(max)
TOW @ 12737'
-8
8.70
Bit Type
Casing
Summary
Lithology (%)
-
8.75
Footage
out (sec/qt)
KCL Brine
Size
27
TFA
45000.0
ml/30min
Oil / Water
Ratio
YP
MaxAvg
Mud Data
Depth
HTHPDensity (ppg)
Min
Viscosity
-
96%
mg/L
Total Charges:
Rig Activity:
-
Chlorides
-
24 hr Max
-
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
11-Apr-2014
12:00 AM
Job No.:
Daily Charges:
ECD
(ppg)
Tools
-
ROP
ROP (ft/hr)
4.23 @
Current Pump & Flow Data:
Lay down 5" drill pipe from 2600' MD to surface. Install and remove wear bushing. Clean rig floor. Service rig.
18899'
2
Minimum
Depth
Maximum
Units*
9 5/8"
Ss
WELL INFORMATION Created On : May 28 2014
Customer :Eni Petroluem
Well Name :OP18-08L1
Job Number :AK-XX-0901202813
Rig Name :Nabors 245
Field Name :Nikaitchuq
Country :USA
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
12681.00 85.28 295.42 3475.39 4,886.40 N 10,150.69 W
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
12737.00 85.26 294.97 3,480.01 4,910.16 N 10,201.19 W 11248.69 0.80
12800.87 85.24 291.79 3,485.30 4,935.41 N 10,259.61 W 11311.58 4.96
12896.07 90.47 287.97 3,488.86 4,967.74 N 10,349.03 W 11404.47 6.80
12959.40 91.59 283.05 3,487.72 4,984.67 N 10,410.02 W 11465.10 7.97
12991.27 90.93 281.08 3,487.02 4,991.33 N 10,441.18 W 11495.01 6.52
13086.85 90.47 280.05 3,485.85 5,008.85 N 10,535.13 W 11583.85 1.18
13182.62 90.54 282.34 3,485.01 5,027.44 N 10,629.07 W 11673.25 2.39
13278.47 90.62 285.04 3,484.04 5,050.12 N 10,722.18 W 11764.13 2.82
13374.32 91.17 288.17 3,482.54 5,077.51 N 10,814.01 W 11856.43 3.32
13470.19 90.35 291.05 3,481.27 5,109.68 N 10,904.30 W 11949.97 3.12
13565.12 90.69 292.29 3,480.41 5,144.73 N 10,992.52 W 12043.30 1.35
13660.85 90.52 293.83 3,479.40 5,182.22 N 11,080.59 W 12137.80 1.62
13756.62 91.10 295.65 3,478.04 5,222.30 N 11,167.56 W 12232.75 1.99
13852.40 90.97 294.96 3,476.31 5,263.23 N 11,254.13 W 12327.82 0.73
13947.99 90.91 293.97 3,474.75 5,302.81 N 11,341.13 W 12422.53 1.04
14043.49 90.87 292.17 3,473.26 5,340.23 N 11,428.98 W 12516.80 1.89
14138.81 91.44 291.55 3,471.34 5,375.71 N 11,517.42 W 12610.55 0.88
14234.62 92.43 291.86 3,468.11 5,411.12 N 11,606.39 W 12704.71 1.08
14330.38 91.00 292.77 3,465.24 5,447.46 N 11,694.93 W 12799.00 1.77
14426.14 88.92 292.27 3,465.31 5,484.14 N 11,783.39 W 12893.39 2.23
14521.98 88.22 292.07 3,467.70 5,520.29 N 11,872.11 W 12987.74 0.76
14617.38 90.36 290.53 3,468.88 5,554.94 N 11,960.98 W 13081.40 2.76
14712.93 88.94 291.14 3,469.46 5,588.92 N 12,050.28 W 13175.07 1.62
14808.69 88.89 292.50 3,471.28 5,624.51 N 12,139.16 W 13269.24 1.42
14904.50 91.01 295.10 3,471.36 5,663.17 N 12,226.81 W 13364.01 3.50
15000.18 92.05 296.73 3,468.81 5,704.97 N 12,312.84 W 13459.08 2.02
15095.90 91.85 300.09 3,465.55 5,750.48 N 12,396.97 W 13554.52 3.51
15191.79 91.87 303.65 3,462.44 5,801.07 N 12,478.34 W 13650.34 3.71
15287.37 91.45 305.80 3,459.67 5,855.49 N 12,556.86 W 13745.79 2.29
15383.05 91.24 305.56 3,457.42 5,911.28 N 12,634.56 W 13841.26 0.33
15478.87 90.42 305.65 3,456.03 5,967.06 N 12,712.46 W 13936.90 0.86
INSITE V8.0.20 Page 1Job No:AK-XX-0901202813 Well Name:OP18-08L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
15574.11 91.11 305.91 3,454.76 6,022.74 N 12,789.72 W 14031.95 0.77
15669.88 90.62 305.96 3,453.31 6,078.94 N 12,867.25 W 14127.50 0.51
15765.73 91.70 305.94 3,451.37 6,135.20 N 12,944.83 W 14223.13 1.13
15861.56 94.16 305.85 3,446.48 6,191.30 N 13,022.35 W 14318.63 2.57
15957.54 92.93 306.54 3,440.54 6,247.87 N 13,099.66 W 14414.19 1.47
16053.10 90.36 305.94 3,437.80 6,304.34 N 13,176.69 W 14509.46 2.76
16148.72 91.10 306.22 3,436.58 6,360.64 N 13,253.97 W 14604.85 0.83
16244.42 90.93 307.85 3,434.89 6,418.27 N 13,330.35 W 14700.19 1.71
16340.33 90.26 309.12 3,433.89 6,477.95 N 13,405.42 W 14795.52 1.50
16436.11 89.67 309.99 3,433.95 6,538.95 N 13,479.26 W 14890.51 1.10
16531.87 88.86 310.87 3,435.18 6,601.04 N 13,552.15 W 14985.28 1.25
16627.77 87.08 310.17 3,438.57 6,663.31 N 13,625.00 W 15080.10 1.99
16723.54 86.98 310.41 3,443.54 6,725.16 N 13,697.95 W 15174.79 0.27
16818.26 86.50 310.46 3,448.92 6,786.49 N 13,769.93 W 15268.38 0.51
16914.19 89.95 309.69 3,451.89 6,848.21 N 13,843.29 W 15363.35 3.68
17010.14 94.30 310.79 3,448.34 6,910.13 N 13,916.47 W 15458.26 4.68
17106.10 96.99 311.27 3,438.90 6,972.81 N 13,988.50 W 15552.62 2.85
17201.96 95.65 312.79 3,428.34 7,036.60 N 14,059.26 W 15646.49 2.11
17297.25 91.72 313.94 3,422.22 7,101.88 N 14,128.38 W 15739.77 4.30
17392.89 90.86 313.65 3,420.07 7,168.06 N 14,197.40 W 15833.43 0.95
17488.83 89.84 312.46 3,419.48 7,233.55 N 14,267.50 W 15927.65 1.63
17584.68 88.53 312.48 3,420.85 7,298.26 N 14,338.19 W 16021.95 1.37
17680.55 89.01 311.29 3,422.90 7,362.25 N 14,409.55 W 16116.43 1.34
17776.33 89.90 310.97 3,423.81 7,425.25 N 14,481.69 W 16211.04 0.99
17871.95 92.15 310.82 3,422.10 7,487.84 N 14,553.95 W 16305.54 2.36
17967.91 89.99 311.29 3,420.31 7,550.85 N 14,626.29 W 16400.34 2.30
18063.82 88.63 311.37 3,421.47 7,614.18 N 14,698.31 W 16495.02 1.42
18159.63 87.40 311.45 3,424.79 7,677.51 N 14,770.12 W 16589.54 1.29
18255.40 88.56 310.96 3,428.16 7,740.56 N 14,842.13 W 16684.07 1.31
18351.17 90.80 310.68 3,428.70 7,803.16 N 14,914.60 W 16778.75 2.36
18446.98 91.47 309.45 3,426.80 7,864.81 N 14,987.91 W 16873.64 1.46
18542.70 91.33 310.67 3,424.46 7,926.40 N 15,061.14 W 16968.43 1.28
18638.51 89.22 310.33 3,424.00 7,988.62 N 15,133.99 W 17063.23 2.23
18734.50 88.04 310.04 3,426.30 8,050.54 N 15,207.30 W 17158.26 1.27
18830.76 90.01 309.70 3,427.93 8,112.23 N 15,281.17 W 17253.64 2.08
18899.00 90.01 309.70 3,427.92 8,155.82 N 15,333.67 W 17321.29 0.00
INSITE V8.0.20 Page 2Job No:AK-XX-0901202813 Well Name:OP18-08L1 Survey Report
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 302.20 degrees (True)
- A total correction of 0.00 deg from Magnetic north to True north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 18,899.00 feet is 17,367.76 feet along 298.01 degrees (True)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.20 Page 3Job No:AK-XX-0901202813 Well Name:OP18-08L1 Survey Report