Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-193 Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Nabors 245 Date: April 12, 2014 Surface Data Logging End of Well Report OP18-08L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. Formation Tops 5. Mud Record 6. Bit Record 7. Morning Reports 8. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Nabors 245 Well: OP18-08L1 Field: Nikaitchuq Project Borough: North Slope Borough State: Alaska Country: United States API Number: 50-029-23449-60-00 Sperry Job Number: AK-XX-0901202813 Job Start Date: 17 March 2014 Spud Date: 26 March 2014 Total Depth: 18899’ MD, 3427’ TVD North Reference: True Declination: 19.443° Dip Angle: 81.024° Total Field Strength: 57624.148 nT Date Of Magnetic Data: 10 March 2014 Wellhead Coordinates N: North 70° 30' 39.32" Wellhead Coordinates W: West 149° 51' 50.41" Drill Floor Elevation 53.15’ Ground Elevation: 12.20’ Permanent Datum: Mean Sea Level SDL Engineers: Charles Sinn / Josiah Failing / Leif Hammes Company Geologist: Andrew Buchanan Company Representatives: Bruce Simonson / Ben Perry SSDS Unit Number: 121 DAILY SUMMARY 03/17/2014 Finish moving rig over new well. Hook up all interconnects. Lay Herculite. Transfer 8.8 ppg brine into pits. Shear top valve. Bullhead 35 bbls 8.8 ppg brine down tubing at 5 bpm. Bullhead 756 bbls brine down annulus at 10 bpm. Monitor well and verify killed. Nipple down tree. Set riser and prep for BOP install. Currently nipple up / down. 03/18/2014 Finish nippling up BOPs. PSI Test BOPs with 4.5" and 5" DP. Rig up 3rd party tools to pull tubing. Pull hanger and pull out of hole with 4.5" tubing from 9810' MD to 9530' MD. Currently pull tubing. 03/19/2014 Pulled 4.5" tubing. Perform rig service. Rig up wireline. Run in hole with wireline to pull pump. Currently pull pump. 03/20/2014 Complete pulling pump with wireline. Lay down pump and rig down wireline. Pull out of hole with 4.5" tubing Lay down pump assembly and tubing tools. Rig service. Load Scraper BHA into shed. Pick up BHA and makeup cleanout assembly. Currently TIH for cleanout run. 03/21/2014 Trip in hole with singles for cleanout run. Clean and polish liner top per Baker rep. Trip out of hole from 12814' MD to 3718' MD. Strap out of hole and rack stands in derrick. Currently tripping out of hole. 03/22/2014 Trip out of hole to 422' MD. Lay down scraper BHA. Pick up isolation packer assembly. Trip in hole to 12814' MD. Set packer at 12794' MD. PSI test packer to 500 psi for 10 mins. Slip and cut. Currently trip out of hole. 03/23/2014 Trip out of hole to surface. Lay down BHA. Rig up wireline, Run in hole with wireline for USIT logs. Tag packer at 12780' MD. Pull out of hole while logging to surface. Rig down wireline. Make up fishing BHA. Prepare to fish. 03/24/2014 Finish making up fishing BHA. Trip in hole to 12700' MD. Tag fish @ 12794' MD. Rig up to reverse circulate. Reverse circulate down annulus. Rig down reverse circulate. Trip out of hole to surface. Lay down BHA with fish. Rig up to PSI test BOPs. Test BOPs. 03/25/2014 Continue testing BOPs. Test good. Lay down testing equipment. Service rig. Make up whipstock BHA. Run in hole to 2053' MD. Perform shallow hole test. Test good. Continue run in hole to 12395' MD with whipstock BHA. Spot pill and pump 50 bbls OBM. Continue run in hole. Gas: Displacement gas of1691 units while spotting 50 bbl OBM pill and pumping. 03/26/2014 Continue run in hole to 12795' MD. Set whipstock. Shear off bottom of window at 12754'. Displace to OBM. Mill window from 12737’ MD to 12776' MD. Pump fiber sweep to surface. Rig up and attempt to perform leak off test. Rig down test manifold. Monitor well, losing at 15 bbls/hr. Run in hole to 12754' MD, pump 50 ppb LCM pill. Spot at 12754' MD. Monitor loss rates at 9 bbls/hr. Make/spot second LCM Pill. Gas: Max gas during displacement of production brine to OBM was 7484 units. 03/27/2014 Continue mixing second LCM pill. Monitor well and losses. Spot pill @ 12754' MD. Monitor well. Continued losses at 13-8 bbls/hr. M/U third 50 bbl LCM pill. Pump and spot @ 12754' MD. Trip out of hole to 12396' MD. Monitor well. Loss rates at 16 bbls/hr. Circulate and condition mud. Pump dry job. Trip out of hole. 03/28/2014 Trip out of hole to surface. Lay down milling BHA. Clean rig floor. Make up mud motor BHA. Trip in hole to 3301' MD. Perform shallow hole test. Continue trip in hole to 8000' MD. Slip and cut. Continue trip in hole to 11354' MD. Gas: No significant trip gas 03/29/2014 Continue trip in hole 12775' MD. Slide/rotate drilling to 13024' MD. Back ream out of hole to 12832' MD. Pull through window at 12737' MD. Continue back ream out of hole to 11438' MD. Lay down 30 joints HWDP. Continue Back ream out of hole to 8757' MD. Gas: There was a max gas of 508 units from 13023’ MD with an average gas of 162 units. 03/30/2014 Continue back ream out of hole to 6000' MD. Pump dry job. Trip out of hole on elevators to surface. Lay down BHA #1. Pick up and make up Xceed BHA #2. Trip in hole 1500' MD. Perform shallow hole test - good. Trip in hole to 5230' MD. Fill pipe every 2000' MD. Continue trip in hole. Gas: No trip gas 03/31/2014 Continue trip in hole to 12676' MD. Wash down to 13024' MD. Drill ahead, rotating from 13024' MD to 13825' MD. Gas: There was a max gas of 748 units from 13766’ MD with an average gas of 480 units. 04/01/2014 Continue rotary drilling from 13825' MD to 15642' MD. Continue drilling ahead. Gas: There was a max gas of 852 units from 14711’ MD with an average gas of 496 units. 04/02/2014 Continue rotary drilling ahead from 15642' MD to 17365' MD. Continue drilling ahead. Gas: There was a max gas of 706 units from 15766’ MD with an average gas of 351 units. 04/03/2014 Continue rotary drilling ahead from 17365' to production TD at 18899' MD. Begin BROOH from 18899' MD to 18323' MD. Continue back ream out of hole. Gas: There was a max gas of 890 units from 18201’ MD with an average gas of 563 units. 04/04/2014 Continue BROOH to 14303' MD at 440 GPM, 120 RPM. Continue BROOH to 12754' MD. Pull through window, no rotating. Tight spot at 12772' MD. Work through. There was 10-15 klbs over pull. BROOH to 8275' MD. Continue BROOH at 440 GPM. Gas: There was a max gas while reaming of 65 units. 04/05/2014 Finish BROOH. Pump bottoms up @ 8275' MD. Pump dry job. Trip out of hole on elevators to surface. Lay down BHA. Pick up and make up whipstock retrieval BHA. Trip in hole to 1981' MD. Perform shallow hole test - good. PSI spike after test, blow pop off. Reset attempt at same rates. Trip out of hole to surface, inspect tool, nothing found. Change out and test tool. Trip in hole to 1981' MD. Perform shallow hole test - good. Perform H2S drill. Slip and cut. Service rig. Trip in hole to 4841' MD. Continue trip in hole. Gas: There was a max gas while reaming of 15 units. 04/06/2014 Continue trip in hole to 12737' MD. Fill pipe every 2500'. Circulate and wash down pump. Hook groove on whipstock, latch up, sheer anchor, hit jars three times to unseat. Service top drive. Trip out of hole to 8168' MD. Pump dry job. Continue trip out of hole to surface. Lay down whipstrock retrieval BHA. Gas: There was a max gas while tripping of 12 units. 04/07/2014 Lay down whipstock retrieval BHA. Service rig. Test BOPs. Rig down testing equipment. Make up hanger BHA. Prep floor. Run 5.5" liner from surface to 6323'. Change elevators to 5". Make up Liner hanger. Gas: No trip gas 04/08/2014 Continue make up liner hanger. Change elevators. Trip in hole with 5.5" liner on 4.5" and 5" drill pipe. Rotate from 17000’ MD to 18899' MD. Pick up, breakout, drop and pump ball. Set hanger at 12525' MD. Test to 1500 psi for 15 mins. Trip out of hole to 12465' MD. Displace to production brine. Lay down Drill pipe. Gas: Max gas while displacing to production brine was 15 units 04/09/2014 Lay down 5" drill pipe to 6230' MD. Trip in hole with 4.5" drill pipe to 7990' MD. Circulate and condition mud - pump citric pill. Service top drive. Trip in hole to 9700' MD. Circulate and condition mud - pump bottoms up. Continue lay down drill pipe to surface. Lay down liner running BHA. Make up mule on 5" drill pipe. Trip in hole to 2660' MD. Pump citric pill to flush OBM from pipe. Blow down top drive. Continue lay down 5" drill pipe. Gas: Max gas while circulating: 6 units 04/10/2014 Lay down 5” drill pipe from 2600’ MD to surface. Install / remove wear bushing. Clean rig floor. Make up shroud and pump assemblies, set pump. 04/11/2014 Pick up, lay down and make up tools. Run in hole ESP with 4.5” tubing testing cable every 1000’. Pipe skate failure. Perform repairs. Continue run in hole with 4.5” tubing from 6138’ MD to 7301’ MD. 11000 12000 13000 14000 15000 16000 17000 18000 19000 20000 0 5 10 15 20 25 30 Me a s u r e d D e p t h Rig Days Prognosed Actual WELL NAME: OP18-08L1 OPERATOR: Eni Petroleum MUD CO: MI Swaco RIG: Nabors 245 SPERRY JOB: AK-XX-0901202813 Days vs. Depth 17 March 2014 Sperry SDL Remains on Location from Previous Well LOCATION: Oliktok Point AREA: Nikaitchuq Field STATE: Alaska SPUD: 26-Mar-2014 TD: 3-Apr-2014 Mill Window through Casing (Spud) On Bot: 05:40 26 Mar 2014 Commenced 8.75" Production Hole Section On Bot: 04:45 29 Mar 2014 TD Production Section 18899' MD, 3427' TVD Off Bot: 17:52 03 Apr 2014 WELL NAME:OP18-08L1 LOCATION:Oliktok Point OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO:MI Swaco STATE:Alaska RIG:Nabors 245 SPUD:26-Mar-2014 SPERRY JOB:AK-XX-0901202813 TD:3-Apr-2014 Marker MD INC AZ TVD TVDSS 8 1/2" Production Section TOW 12,737.0 85.3 295.0 3,480.0 -3,480.0 BOW 12,754.0 85.3 294.1 3,481.4 -3,481.4 OA-Sand Top 12,828.0 86.7 290.7 3,487.2 -3,487.2 OA-2 14,367.0 90.2 292.6 3,464.9 -3,464.9 OA-3 14,520.0 88.2 292.1 3,467.6 -3,467.6 OA-3 15,870.0 94.1 305.9 3,445.9 -3,445.9 Fault 1 16,186.0 91.0 306.9 3,435.9 -3,435.9 OA-Sand Top 16,493.0 89.2 310.5 3,434.5 -3,434.5 OA-Sand Top 16,593.0 87.7 310.4 3,437.0 -3,437.0 Fault 2 16,857.0 87.9 310.1 3,450.8 -3,450.8 OA-Sand Bottom 17,043.0 95.2 311.0 3,445.6 -3,445.6 OA-4 17,100.0 96.8 311.2 3,439.7 -3,439.7 OA-3 17,182.0 95.9 312.5 3,430.4 -3,430.4 OA-2 17,312.0 91.6 313.9 3,421.8 -3,421.8 Fault 3 18,373.0 90.9 310.4 3,428.4 -3,428.4 OA-2 18,474.0 91.4 309.8 3,426.1 -3,426.1 TD 8 3/4" Borehole 18,899.0 90.0 309.7 3,427.9 -3,427.9 Formation Tops OP18-08L1 Eni Petroleum MI Swaco Nabors 245 AK-XX-0901202813 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/R 6/R3 Cake Solids Oil/Water Alka POM Excess Lime Emul Stab Sand Chlorides ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts %mg/L 17-Mar 12814 8.80 27 ------------44500 Nipple up / Down 18-Mar 12814 8.80 27 ------------53000 POOH w/ 4.5" tubing 19-Mar 12814 8.80 27 ------------53000 Pull pump w/ wireline 20-Mar 12814 8.80 27 ------------54000 Trip in hole with scraper 21-Mar 12814 8.80 27 ------------54000 Trip out of hole with cleanout 22-Mar 12814 8.80 27 ------------54000 Trip out of hole 23-Mar 12814 8.80 27 ------------54000 Prepare to fish 24-Mar 12814 8.80 27 ------------55000 Testins BOPs 25-Mar 12814 8.80 27 ------------55000 Run in hole with Whipstock BHA 26-Mar 12775 8.90 45 13 14 6/6/7 N/A 40/27/23/17/7/6 N/A 8.6 64.0 1.80 2.34 590.0 0.1 38000 Mixing 2nd LCM pilll 27-Mar 12775 8.70 45 11 13 5/5/6 N/A 35/24/19/14/6/5 N/A 7.8 66.0 1.90 2.47 574.0 0.1 38000 Pull out of hole 28-Mar 12775 8.70 45 11 12 5/5/6 N/A 34/23/18/13/6/5 N/A 7.0 64.0 2.10 2.73 550.0 0.1 30500 Run in hole with BHA #1 29-Mar 13024 8.70 44 11 15 6/6/7 4.4 37/26/21/16/7/6 N/A 8.0 64.0 2.20 2.86 608.0 0.1 29000 Back ream out of hole 8.75" hole L1 30-Mar 13024 8.65 45 11 12 6/6/7 4.8 34/23/18/13/6/5 NA/1 7.87 64.0 1.9 2.47 670 0.1 29000 Run in hole with BHA #2 31-Mar 13531 8.7 45 11 16 6/6/7 6.2 38/27/22/17/7/6 NA/1 6.85 66 1.9 2.47 660 0.1 32000 Drill 8.7" hole L1 1-Apr 15413 8.7 44 12 14 5/6/6 5.6 38/26/21/16/7/6 NA/1 8.96 66 1.9 2.47 740 0.1 29000 Drill 8.7" hole L1 2-Apr 17118 8.75 45 14 16 7/7/8 5.2 44/30/24/18/8/7 NA/1 8.98 65 1.6 2.08 623 0.1 29000 Drill 8.7" hole L1 3-Apr 18899 8.7 47 12 17 7/7/8 4.2 41/29/24/18/8/7 NA/1 8.85 64 1.7 2.21 540 0.1 32000 Back ream out of hole 4-Apr 18899 8.7 47 12 17 7/7/8 4.2 41/29/24/18/8/7 NA/1 8.85 64 1.7 2.21 540 0.1 32000 Back ream out of hole 5-Apr 18899 8.75 47 11 15 6/6/7 4.8 37/26/21/16/7/6 NA/1 8.95 64 1.9 2.47 637 0.1 33000 Run in hole with whipstock retrieval tool 6-Apr 18899 8.8 51 11 19 7/7/8 5.0 41/30/25/19/8/7 NA/1 8.76 64 1.9 2.47 640 0.1 34000 Lay down retrieval tool Casing Record STATE:Alaska RIG:SPUD:26-Mar-2014 SPERRY JOB:TD:3-Apr-2014 9.625" Casing BOW @ 12754' MD, 3481' TVD Remarks 20" Conductor @ 160' MD, 160' TVD 5.5" Liner @ 18899' MD, 3427' TVD WELL NAME:LOCATION:Olikok Point OPERATOR:AREA:Nikaitchuq Field MUD CO: W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments -200 1 Milled Tooth XR+9 12737 12775 38 7.7 0.746 5 63 104 2250 500 1-1-WT-A-E-I-NO-BHA Mill Window 1 300 1 RR Milled Tooth XR+8.75 12775 13024 249 2.90 0.746 86.8 10 40 2400 450 1-1-WT-A-E-I-NO-BHA TD Production Build Section 2 400 2 SKH616M 8.75 13024 18899 5875 42.40 0.902 138.7 10 120 2500 440 1-0-CT-C-X-I-NO-TD TD Production Section WELL NAME:OP18-08L1 LOCATION:Oliktok Point OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO: SPERRY JOB:AK-XX-0901202813 TD:3-Apr-2014 MI Swaco STATE:Alaska RIG:Nabors 245 SPUD:26-Mar-2014 B i t R e c o r d . . * 24 hr Recap:Finish moving rig over new well. Hook up all incerconnects. Lay Herculite. Transfer 8.8 ppg brine into pits. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 44500.00 0 17-Mar-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 1 Customer: Well: Area: Location: Rig: OP18-08-L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.80 Size No gas readings Monitor well and verify killed. Nipple down tree. Set riser and prep for BOP install. Nipple up / down at report time. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-901202813 Nipple up / down PV Footage Perry / Ruminer ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: Shear top valve. Bullhead 35 bbls 8.8 ppg brine down tubing at 5 bpm. Bullhead 756 bbls brine down annulus at 10 bpm. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / L. Hammes Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / L. Hammes 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: Pull hanger and pull out of hole 4.5" tubing from 9810' MD to 9530' MD. Currently pulling tubing. 12814' 12814' 0' Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Ruminer ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-901202813 Pull tubing PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No gas readings ConditionBit # 8.80 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 2 Customer: Well: Area: Location: Rig: OP18-08-L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 18-Mar-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 44500.00 Finish nippling up BOPs. PSI Test BOPs with 4.5" and 5" DP. Rig up 3rd party tools to pull tubing. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Pulled 4.5" tubing. Perform rig service. Rig up wireline. Run in hole with wireline to pull pump. Currently pull pump.. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 44500.00 0 19-Mar-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 3 Customer: Well: Area: Location: Rig: OP18-08-L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.80 Size No significant gas 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-901202813 Pull pump with wireline PV Footage Perry / Ruminer ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 12814' 12814' 0' Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / L. Hammes Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / L. Hammes 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: Lay down pump assembly and tubing tools. Rig service. Load Scraper BHA into shed. Pick up BHA and makeup cleanout 12814' 12814' 0' Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-901202813 TIH Scraper Run PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No significant gas assembly. Currently TIH for cleanout run. ConditionBit # 8.80 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 4 Customer: Well: Area: Location: Rig: OP18-08-L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 20-Mar-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 44500.00 Complete pulling pump with wireline. Lay down pump and rig down wireline. Pull out of hole with 4.5" tubing Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Trip in hole with singles for cleanout run. Clean and polish liner top per Baker rep. Trip out of hole from Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 44500.00 0 21-Mar-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 5 Customer: Well: Area: Location: Rig: OP18-08-L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.80 Size No significant gas 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-901202813 TOOH with Scraper PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 12814' 12814' 0' Max @ ft Current Date: Time: 12814' MD to 3718' MD. Strap out of hole and rack stands in derrick. Currently tripping out of hole. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / L. Hammes Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap: Mud Type KCL Brine Casing Summary Lithology (%) - 12391' TOOH t/ 422'. L/D scraper BHA. P/U isolation packer assembly. TIH t/ 12814'. Set packer @ 12794' MD. PSI test - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 6 Customer: Well: Area: Location: Rig: 22-Mar-2014 12:00 AM Job No.: Daily Charges: AK-AM-0901202813 96% mg/L Total Charges: Rig Activity: - Chlorides - Avg Min 54000.0 - -MWD Summary YP Max Ratio Mud Data Depth 8.80 HTHP Density (ppg) out (sec/qt) Viscosity 27 TFA Condition Bit # Bit Type Footage Connection Size - C-3 No Trip Gas 100% Gas In Air Trip 0 =10,000 Units (max) 0 Background Average N/A Mud (lb/bbl) ml/30min RPM Lst 0 00 C-4i 00 C-4n 0 Cement C-1 C-5i Chromatograph (ppm) Oil / Water Hours 0 0 Type Weight Flow In (spm) Grade (current) Units* Clyst Set At Ss Cht Silt Siltst Sh Cly Depth - Avg to - Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 0 12814' 12814' 0' Lime Tuff Gvl C-5n - Alkal Coal Gallons/stroke packer t/ 500 psi for 10 mins. Slip and cut. TOOH. - 0 0 0- Minimum Depth Maximum in Gas Summary 0 0 0 0 907-685-1490 Unit Phone: 0 J. Failing Report By: 0 Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: Size Comments TOOH PV cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) 0 C-2 Logging Engineers: Failing / Hammes (max) (current) . . * 24 hr Recap: Logging Engineers: Failing / Hammes (max) (current) 0 C-2 PV cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Comments Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: Prepare to fish 0 907-685-1490 Unit Phone: 0 J. Failing Report By: 0 0 0 0 - Minimum Depth Maximum in Gas Summary 0 0 0 logging t/ surface. R/D wireline. M/U fishing BHA. Prepare to fish. - C-5n - Alkal Coal Gallons/stroke 0 12814' 12814' 0' Lime Tuff Gvl - Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: Sh Cly Depth - Avg to - Current - Units* Clyst Set At Ss Flow In (spm) Grade (current) Cht Silt Weight Oil / Water Hours 0 0 Type Siltst Cement C-1 C-5i Chromatograph (ppm) 00 C-4i 00 C-4n 0 Lst 0 Mud (lb/bbl) ml/30min RPM Average N/A 0 Background Trip 0 =10,000 Units No Trip Gas 100% Gas In Air (max) Size Bit # Bit Type Footage Connection - C-3 27 TFA Condition Mud Data Depth 8.80 HTHP Density (ppg) out (sec/qt) Viscosity Min 54000.0 - -MWD Summary YP Max Ratio AK-AM-0901202813 96% mg/L Total Charges: Rig Activity: - Chlorides - Avg Morning Report Report # 7 Customer: Well: Area: Location: Rig: 23-Mar-2014 12:00 AM Job No.: Daily Charges: 24 hr Max ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: TOOH to surface. L/D BHA. R/U wireline, RIH w/ wireline for USIT logs. Tag packer @ 12780' MD. POOH while Mud Type KCL Brine Casing Summary Lithology (%) - 12391' . . * 24 hr Recap: Mud Type KCL Brine Casing Summary Lithology (%) - 12814' Finish M/U fishing BHA. TIH t/ 12700'. Tag fish @ 12794' MD. R/U to reverse circulate. Reverse circulate down - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: 24 hr Max ECD (ppg) Tools Morning Report Report # 8 Customer: Well: Area: Location: Rig: 24-Mar-2014 12:00 AM Job No.: Daily Charges: Ratio AK-AM-0901202813 96% mg/L Total Charges: Rig Activity: - Chlorides - - -MWD Summary YP Max Avg Mud Data Depth 8.80 HTHP Density (ppg) out (sec/qt) Viscosity 27 TFA Condition 55000.0 Bit # Bit Type Footage Connection - C-3 Size No Trip Gas 100% Gas In Air (max) Trip 0 =10,000 Units 0 Background Average N/A ml/30min RPM 0 00 C-4n 0 Lst Chromatograph (ppm) 00 C-4i Siltst Cement C-1 C-5i Oil / Water Hours 0 0 Type Weight Grade (current) Cht Silt Units* Clyst Set At Ss Depth - Avg to - Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Max @ ft - Date: Time: 12814' 12814' 0' Lime Tuff Gvl Mud (lb/bbl) Min - Alkal Coal Gallons/stroke Sh Cly Flow In (spm) C-5n 0 annulus. R/D reverse circulate. TOOH t/ surface. L/D BHA w/ fish. R/U to PSI test BOPs. Test BOPs. - Gas Summary 0 0 0 0 - Minimum Depth Maximum in Report By: 0 0 0 Testing BOPs 0 907-685-1490 Unit Phone: 0 J. Failing Comments Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: PV cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Logging Engineers: Failing / Hammes (max) (current) 0 C-2 . . * 24 hr Recap: Mud Type KCL Brine Casing Summary Lithology (%) - 12814' Continue testing BOPs. Test good. L/D testing equipment. Service rig. M/U whipstock BHA. RIH t/ 2053' MD. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 9 Customer: Well: Area: Location: Rig: 25-Mar-2014 12:00 AM Job No.: Daily Charges: AK-AM-0901202813 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max - -MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) out (sec/qt) Viscosity 27 Ratio 54000.0 Size Depth 8.80 Connection - C-3 TFA Bit # Bit Type Footage (max) Grade =10,000 Units Trip Gas/Displacement Gas: 1691 units while spotting 50 bbl OBM pill and pumping. 100% Gas In Air Trip 00 Background Average 1691 ml/30min RPM Condition C-1 0 Cement C-5i C-4n 0 Chromatograph (ppm) 00 C-4i 00 Oil / Water Hours 0 0 Type Weight Gas Summary Cht Silt Lst Siltst Clyst Set At Ss (current) - Current -- Units* Max @ ft - Date: Time: - - Avg to Min Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Cly Flow In (spm) Comments 12814' 12814' 0' Lime Tuff Gvl 0 Alkal Coal Sh Mud (lb/bbl) C-5n Perform shallow hole test. Test good. Continue RIH t/ 12395' w/ whipstock BHA. Spot pill, pump 50 bbls OBM. Continue RIH. - 0 0 0 0 - Minimum Depth Maximum in Report By: 0 0 0 TIH w/ HWDP 0 907-685-1490 Unit Phone: 0 J. Failing Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: PV cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke Logging Engineers: Failing / Hammes (max) (current) 0 C-2 . . * 24 hr Recap: Failing / Hammes (max) (current) 14 C-2 cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: 907-685-1490 Unit Phone: 0 J. Failing Logging Engineers: Report By: 0 0 16 Minimum Depth Maximum in 0 0 9 12750' 24 PV 12745' 0 0 Pump fiber sweep t/ surface. R/U and attempt to perform leak off test. R/D test manifold. Monitor well, losing ~15 bbls/hr. RIH t/ 3 Tuff Gvl 0 Alkal Coal Sh Mud 40# Comments 12737' 12775' 38' Lime (lb/bbl) Min Yesterday's Depth: Current Depth: 24 Hour Progress: 121 SPP (psi) Date: Time: 511 12775' Avg to Flow In (spm) Spotting LCM Pill 12737' Current 13.4 - Units* Max @ ft 12773' Clyst Set At Ss (current) Cht Silt Lst Siltst Cly 0 0 Type Weight Gas Summary 9 5/8" Milled Tooth XR+ Oil / Water Hours 0.746 00 C-4i 00 C-5n Cement C-5i C-4n 0 Chromatograph (ppm) Condition C-1 0 1.80 RPM N/A 14 Average 7484 Trip 00 Max gas during displacement of production brine to OBM: 7484 units. 12754', pump 50 ppb LCM pill. Spot @ 12754'. Monitor loss rates @ ~9 bbls/hr. Make/spot second LCM Pill. 100% Gas In Air Background Grade =10,000 Units (max) TOW @ 12737'BOW @ 12754'Hydril 563 L-80 -Connection 1 C-3 TFA 8.75 12737' Bit # 13 38000.0 Size Depth 73-27 8.90 Bit Type Footage ml/30min 2.34 out (sec/qt) Viscosity 45 Ratio - -MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) AK-AM-0901202813 96% mg/L Total Charges: Rig Activity: 80.0 Chlorides - 24 hr Max Morning Report Report # 10 Customer: Well: Area: Location: Rig: 26-Mar-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools 2210 ROP ROP (ft/hr) Telescope 675 4.23 @ Current Pump & Flow Data: Continue RIH t/ 12795'. Set whipstock. Shear off BOW @ 12754'. Displace to OBM. Mill window f/ 12737-12776' MD. Mud Type FazePro OBM Casing Summary Lithology (%) 1 12735' 1 . . * 24 hr Recap: FazePro Casing Summary Lithology (%) - 12735' 1 Continue mixing second LCM pill. Monitor well and losses. Spot pill @ 12754' MD. Monitor well. Continued losses - ROP ROP (ft/hr) Telescope 675 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 11 Customer: Well: Area: Location: Rig: 27-Mar-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max -MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) (sec/qt) Viscosity 45 Ratio - 33000.0 Size Depth 72-28 8.70 Bit Type Footage ml/30min 2.47 out - C-3 TFA 8.75 12737' Bit # (max) TOW @ 12737'BOW @ 12754'Hydril 563 L-80 -=10,000 Units Connection Max trip gas: 7 units Circulate and condition mud. Pump dry job. TOOH. 100% Gas In Air Background Trip 00Average 7 1.90 RPM N/A 13 11 C-1 0 Grade Cement C-5i C-4n 0 Chromatograph (ppm) 00 C-4i 00 C-5n Milled Tooth XR+ Oil / Water Hours 0.746 0 0 Type Weight Gas Summary 9 5/8" Cht Silt Lst Siltst Cly Max @ ft - Clyst Set At Avg to Flow In (spm) TOOH 12737' Current -- Min Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Date: Time: - 40# Comments 12775' 12775' 0' Lime (lb/bbl) Tuff Gvl 0 Alkal Coal Sh Mud at 13-8 bbls/hr. M/U third 50 bbl LCM pill. Pump and spot @ 12754' MD. TOOH t/ 12396'. Monitor well. Loss rates @ 16 bbls/hr. - - 0 0 0 0 - - 0 PV Minimum Depth Maximum in Units* Ss (current) Mud Type Report By: 0 0 0 907-685-1490 Unit Phone: 0 J. Failing Logging Engineers: Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: AK-AM-0901202813 Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 12775' Condition Failing / Hammes (max) (current) 0 C-2 cP . . * 24 hr Recap: Failing / Hammes (max) (current) 0 C-2 cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 12775' Condition Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: AK-AM-0901202813 907-685-1490 Unit Phone: 0 J. Failing Logging Engineers: Report By: 0 0 0 Depth Maximum in Units* Ss (current) Mud Type 0 0 - - 0 PV - 0 0 Continue TIH t/ 8000'. Slip and cut. Continue TIH t/ 11354'. - Tuff Gvl 0 Alkal Coal Sh Mud 40# Comments 12775' 12775' 0' Lime (lb/bbl) Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Date: Time: - Avg to Flow In (spm) TOOH 12775' Current -- Max @ ft - Clyst Set At Cht Silt Lst Siltst Cly 0 0 Type Weight Gas Summary 9 5/8" Milled Tooth XR+ Oil / Water Hours 0.746 00 C-4i 00 C-5n Cement C-5i C-4n 0 Chromatograph (ppm) C-1 0 Grade RPM N/A 12 11 Average 0Trip 00 Max trip gas: 0 units 100% Gas In Air Background =10,000 Units Connection (max) TOW @ 12737'BOW @ 12754'Hydril 563 L-80 -- C-3 TFA 8.75 12737' Bit # Size Depth 70-30 8.70 Bit Type Footage out (sec/qt) Viscosity 45 Ratio - 30500.0 ml/30min 2.73 2.10 MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max - Morning Report Report # 12 Customer: Well: Area: Location: Rig: 28-Mar-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools - ROP ROP (ft/hr) XP Motor 1.5, Telescope 675, MI Swaco Well Commander 4.23 @ Current Pump & Flow Data: TOOH t/ surface. L/D milling BHA. Clean rig floor. M/U mud motor BHA. TIH t/ 3301' MD. Perform shallow hole test. FazePro Casing Summary Lithology (%) - 12775' 1 Minimum . . * 24 hr Recap: Casing Summary Lithology (%) 3 12775' 1 Minimum Continue TIH t/ 12775' MD. Slide/rotate drilling t/ 13024'. BROOH t/ 12832'. Pull through window @ 12737'. 2390 ROP ROP (ft/hr) XP Motor 1.5, Telescope 675, MI Swaco Well Commander 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 13 Customer: Well: Area: Location: Rig: 29-Mar-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: 482.0 Chlorides - 24 hr Max -MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity 44 Ratio - 29000.0 ml/30min 2.86 2.20 70-30 8.75 Bit Type Footage out (sec/qt) FazePro - C-3 TFA 8.75 12737' Bit # (max) TOW @ 12737'BOW @ 12754'Hydril 563 L-80 -=10,000 Units Connection Max Trip Gas: 39 units Max Gas: 508 units 100% Gas In Air Background Trip 30 89 Average 39 RPM N/A 15 248' 11 C-1 125 Grade Cement C-5i C-4n 14 Chromatograph (ppm) 631 C-4i 00 C-5n Milled Tooth XR+ Oil / Water Hours 13023' 0.746 366 239 Type Weight Gas Summary 9 5/8" Cht Silt Lst Siltst Cly Max @ ft 12854' Clyst Set At Avg to Flow In (spm) BROOH 12775' Current 133.6 - Yesterday's Depth: Current Depth: 24 Hour Progress: 108 SPP (psi) Date: Time: 445 40# Comments 12775' 13024' 249' Lime (lb/bbl) Tuff Gvl 0 Alkal Coal Sh Mud Continue BROOH t/ 11438'. L/D 30 jts HWDP. Continue BROOH t/ 8757'. 162 13023' 0 121 58 58 508 12963' 52793 PV Depth Maximum in Units* Ss (current) Mud Type Size Depth Report By: 0 0 13933 907-685-1490 Unit Phone: 27 J. Failing Logging Engineers: Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: AK-AM-0901202813 Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 12775' Condition Failing / Hammes (max) (current) 76 C-2 cP . . * 24 hr Recap: Failing / Hammes (max) (current) 0 C-2 cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 13024' Condition Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: AK-AM-0901202813 907-685-1490 Unit Phone: 0 J. Failing Logging Engineers: Report By: 0 0 0 Maximum in Units* Ss (current) Mud Type Depth 0 0 - - 0 PV - 0 0 #2. TIH t/ 1500'. Perform shallow hole test - good. TIH t/ 5230' MD. Fill pipe every 2000'. Continue TIH. - Tuff Gvl 0 Alkal Coal Sh Mud 40# Comments 13024' 13024' 0' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Date: Time: - Avg to Flow In (spm) TIH 13024' Current -- Max @ ft - Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Cht Silt Lst Siltst Cly 0 0 Type Weight Gas Summary 9 5/8" SKH616M 13024' Oil / Water Hours 0.902 249' 00 C-4i 00 C-5n Cement C-5i C-4n 0 Chromatograph (ppm) C-1 0 Grade RPM N/A 12 11 Average 0Trip 00 No Trip Gas 100% Gas In Air Background =10,000 Units Connection (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -- C-3 TFA 8.75 13024' 12737' Bit # 8.65 Bit Type Footage out (sec/qt) FazePro Size 45 Ratio - 31500.0 ml/30min 2.47 1.90 70-30 MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max - Morning Report Report # 14 Customer: Well: Area: Location: Rig: 30-Mar-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools - ROP ROP (ft/hr) Xceed675, PeriScope675,TeleScope675, Neoscope 4.23 @ Current Pump & Flow Data: Continue BROOH t/ 6000' MD. Pump dry job. TOOH on elevators t/ surface. L/D BHA #1. P/U and M/U Xceed BHA Casing Summary Lithology (%) - 13024' 2 Minimum Depth . . * 24 hr Recap: Casing Summary Lithology (%) 3 13531' 2 Minimum Depth Continue TIH t/ 12676' MD. Wash down t/ 13024' MD. Drill ahead, rotating f/ 13024' t/ 13825' MD. 2120 ROP ROP (ft/hr) Xceed675, PeriScope675,TeleScope675, Neoscope 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 15 Customer: Well: Area: Location: Rig: 31-Mar-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: 243.4 Chlorides 10.26 24 hr Max 10.50 MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity 9.69 32000.0 ml/30min 2.47 1.90 72-28 8.70 Bit Type Footage out (sec/qt) FazePro Size 45 Ratio 123 C-3 TFA 8.75 13024' 12737' Bit # (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -=10,000 Units Connection No Trip Gas Max Gas: 748 units 100% Gas In Air Background Trip 124 341 Average 0 RPM N/A 16 11 C-1 226 Grade Cement C-5i C-4n 63 Chromatograph (ppm) 30 125 C-4i 00 C-5n SKH616M 13024' Oil / Water Hours 0.902 249' 594 419 Type Weight Gas Summary 9 5/8" Cht Silt Lst Siltst Cly Max @ ft 13068' Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Avg to Flow In (spm) Drill Ahead 13024' Current 176.6 243.0 Yesterday's Depth: Current Depth: 24 Hour Progress: 108 SPP (psi) Date: Time: 452 40# Comments 13024' 13825' 801' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Tuff Gvl 0 Alkal Coal Sh Mud 480 13766' 0 223 113 237 748 Mult 80799 PV Maximum in Units* Ss (current) Mud Type Depth Report By: 0 0 47811 907-685-1490 Unit Phone: 54 J. Failing Logging Engineers: Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Simonson / Sherman Report For: AK-AM-0901202813 Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 13024' Condition Failing / Hammes (max) (current) 19 C-2 cP . . * 24 hr Recap: Failing / Hammes (max) (current) 46 C-2 cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 15642' Condition Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / Sherman Report For: AK-AM-0901202813 907-685-1490 Unit Phone: 85 J. Failing Logging Engineers: Report By: 0 0 45925 Maximum in Units* Ss (current) Mud Type Depth 167 309 852 Mult 88189 PV 14711' 0 303 496 Tuff Gvl 0 Alkal Coal Sh Mud 40# Comments 13825' 15642' 1817' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Yesterday's Depth: Current Depth: 24 Hour Progress: 102 SPP (psi) Date: Time: 445 Avg to Flow In (spm) Drill Ahead 13024' Current 165.8 5.0 Max @ ft 14024' Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Cht Silt Lst Siltst Cly 711 517 Type Weight Gas Summary 9 5/8" SKH616M 13024' Oil / Water Hours 0.902 249' 61 204 C-4i 20 C-5n Cement C-5i C-4n 122 Chromatograph (ppm) C-1 291 Grade 1-15k RPM N/A 100-120 14 12 Average -Trip 200 384 Multiple 0 values for total gas due to frequent MWD downlinking/cycling of pumps. 100% Gas In Air Background =10,000 Units Connection (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -113 C-3 TFA 8.75 13024' 12737' Bit # 8.70 Bit Type Footage out (sec/qt) FazePro Size 44 Ratio 10.14 29000.0 ml/30min 2.47 1.90 73-27 MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity 96% mg/L Total Charges: Rig Activity: 235.3 Chlorides 10.41 24 hr Max 10.59 Morning Report Report # 16 Customer: Well: Area: Location: Rig: 1-Apr-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools 2150 ROP ROP (ft/hr) Xceed675, PeriScope675,TeleScope675, Neoscope 4.23 @ Current Pump & Flow Data: Continue rotary drilling f/ 13825' t/ 15642'. Continue drilling ahead. Casing Summary Lithology (%) 0 15413' 2 Minimum Depth . . * 24 hr Recap: Casing Summary Lithology (%) 0 17118' 2 Minimum Depth Continue rotary drilling ahead f/ 15642' t/ 17365' MD. Continue drilling ahead. 2370 ROP ROP (ft/hr) Xceed675, PeriScope675,TeleScope675, Neoscope 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 17 Customer: Well: Area: Location: Rig: 2-Apr-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: 237.7 Chlorides 10.75 24 hr Max 11.29 MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity 10.32 32000.0 ml/30min 2.08 1.60 71-29 8.75 Bit Type Footage out (sec/qt) FazePro Size 45 Ratio 65 C-3 TFA 8.75 13024' 12737' Bit # (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -=10,000 Units Connection Multiple 0 values for total gas due to frequent MWD downlinking/cycling of pumps. 100% Gas In Air Background Trip 165 290 Average - 1-15k RPM N/A 100-120 16 14 C-1 270 Grade Cement C-5i C-4n 109 Chromatograph (ppm) 60 167 C-4i 00 C-5n SKH616M 13024' Oil / Water Hours 0.902 249' 659 508 Type Weight Gas Summary 9 5/8" Cht Silt Lst Siltst Cly Max @ ft 16701' Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Avg to Flow In (spm) Drill Ahead 13024' Current 161.7 118.0 Yesterday's Depth: Current Depth: 24 Hour Progress: 106 SPP (psi) Date: Time: 440 40# Comments 15642' 17365' 1723' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Tuff Gvl 0 Alkal Coal Sh Mud 351 15766' 0 296 169 243 706 Mult 72757 PV Maximum in Units* Ss (current) Mud Type Depth Report By: 0 0 31846 907-685-1490 Unit Phone: 91 J. Failing Logging Engineers: Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / Sherman Report For: AK-AM-0901202813 Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 17365' Condition Failing / Hammes (max) (current) 28 C-2 cP . . * 24 hr Recap: Failing / Sinn (max) (current) 112 C-2 cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 18899' Condition Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / Sherman Report For: AK-AM-0901202813 907-685-1490 Unit Phone: 74 J. Failing Logging Engineers: Report By: 0 3 54167 Maximum in Units* Ss (current) Mud Type Depth 165 269 890 17529' 89449 PV 18201' 6 250 Continue BROOH. 563 Tuff Gvl 0 Alkal Coal Sh Mud 40# Comments 17365' 18899' 1534' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Yesterday's Depth: Current Depth: 24 Hour Progress: 103 SPP (psi) Date: Time: 430 Avg to Flow In (spm) BROOH 13024' Current 166.0 - Max @ ft 17756' Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Cht Silt Lst Siltst Cly 616 402 Type Weight Gas Summary 9 5/8" SKH616M 13024' Oil / Water Hours 0.902 249' 58 181 C-4i 53 C-5n Cement C-5i C-4n 123 Chromatograph (ppm) C-1 246 Grade 1-15k RPM N/A 100-120 17 12 Average -Trip 179 393 100% Gas In Air Background =10,000 Units Connection (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -128 C-3 TFA 8.75 13024' 12737' Bit # 8.70 Bit Type Footage out (sec/qt) FazePro Size 47 Ratio 10.81 32000.0 ml/30min 2.21 1.70 71-29 MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity 96% mg/L Total Charges: Rig Activity: 237.0 Chlorides 11.27 24 hr Max 11.48 Morning Report Report # 18 Customer: Well: Area: Location: Rig: 3-Apr-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools 2270 ROP ROP (ft/hr) Xceed675, PeriScope675,TeleScope675, Neoscope 4.23 @ Current Pump & Flow Data: Continue rotary drilling ahead f/ 17365' t/ production TD @ 18899' MD. Begin BROOH f/ 18899' t/ 18323' MD. Casing Summary Lithology (%) 16 18899' 2 Minimum Depth . . * 24 hr Recap: Casing Summary Lithology (%) - 18899' 2 Minimum Depth Continue BROOH t/ 14303' @ 440 GPM, 120 RPM. Continue BROOH t/ 12754'. Pull through window, no rotating. 1550 ROP ROP (ft/hr) Xceed675, PeriScope675,TeleScope675, Neoscope 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 19 Customer: Well: Area: Location: Rig: 4-Apr-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max -MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity - 33000.0 ml/30min 2.34 1.80 71-29 8.75 Bit Type Footage out (sec/qt) FazePro Size 47 Ratio - C-3 TFA 8.75 13024' 12737' Bit # (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -=10,000 Units Connection Max Gas while reaming: 65 units 100% Gas In Air Background Trip 00Average 65 1-15k RPM N/A 100-120 15 11 C-1 0 Grade Cement C-5i C-4n 0 Chromatograph (ppm) 00 C-4i 00 C-5n SKH616M 13024' Oil / Water Hours 0.902 249' 0 0 Type Weight Gas Summary 9 5/8" Cht Silt Lst Siltst Cly Max @ ft - Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Avg to Flow In (spm) BROOH 13024' Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: 98 SPP (psi) Date: Time: 430 40# Comments 17365' 18899' 1534' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Tuff Gvl 0 Alkal Coal Sh Mud Tight spot @ 12772' MD. Work through. 10-15 klbs over pull. BROOH t/ 8275'. Continue BROOH @ 440 GPM. - - 0 0 0 0 - - 0 PV Maximum in Units* Ss (current) Mud Type Depth Report By: 0 0 0 907-685-1490 Unit Phone: 0 J. Failing Logging Engineers: Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / Sherman Report For: AK-AM-0901202813 Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke 18899' Condition Failing / Sinn (max) (current) 0 C-2 cP . . * 24 hr Recap: Max Gas while reaming: 15 units No Trip Gas Failing / Sinn (max) (current) 0 C-2 cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke Condition Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / Sherman Report For: AK-AM-0901202813 907-685-1490 Unit Phone: 0 J. Failing Logging Engineers: Report By: 0 0 0 Maximum in Units* Ss (current) Mud Type Depth 0 0 - - 0 PV - 0 0 M/U whipstock retrieval BHA. TIH t/ 1981'. Perform shallow hole test - good. PSI spike after test, blow pop off. Reset attempt @ - Tuff Gvl 0 Alkal Coal Sh Mud 40# Comments 18899' 18899' 0' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Yesterday's Depth: Current Depth: 24 Hour Progress: 98 SPP (psi) Date: Time: 430 Avg to Flow In (spm) TIH for whipstock Current -- Max @ ft - Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Cht Silt Lst Siltst Cly 0 0 Type Weight Gas Summary 9 5/8" Hycalog SKH616M 13024' Oil / Water Hours 18899' 0.902 249' 42.40 00 C-4i 00 C-5n Cement C-5i C-4n 0 Chromatograph (ppm) 1-0-CT-C-X-I-NO-TD C-1 0 Grade 10.0 RPM N/A 120.0 15 5875' 11 Average 15 Trip 00 Perform H2S drill. Slip and cut. Service rig. TIH t/ 4841'. Continue TIH. same rates. TOOH t/ surface, inspect tool, nothing found. Change out and test tool. TIH t/ 1981'. Perform shallow hole test - good. 100% Gas In Air Background =10,000 Units Connection (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -- C-3 TFA 8.75 13024' 12737' Bit # 8.75 Bit Type Footage out (sec/qt) FazePro Size 47 Ratio - 33000.0 ml/30min 2.47 1.90 71-29 MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max - Morning Report Report # 20 Customer: Well: Area: Location: Rig: 5-Apr-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools 1550 ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: Finish BROOH. Pump bottoms up @ 8275' MD. Pump dry job. TOOH on elevators t/ surface. L/D BHA. P/U and Casing Summary Lithology (%) - 18899' 2 Minimum Depth . . * 24 hr Recap: Casing Summary Lithology (%) - 18899' 2 Minimum Depth Continue TIH t/ 12737' MD. Fill pipe every 2500'. Circulate and wash down pump. Hook groove on whipstock, - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 21 Customer: Well: Area: Location: Rig: 6-Apr-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max -MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity - 34000.0 ml/30min 2.47 1.90 71-29 8.80 Bit Type Footage out (sec/qt) FazePro Size 51 TFA 8.75 13024' 12737' Bit # (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -10,000 Units Connection - Max gas during trip: 12 units L/D whipstrock retrieval BHA. 100% Gas In Air Background =Trip 00Average 12 10.0 RPM N/A 120.0 19 5875' 11 1-0-CT-C-X-I-NO-TD C-1 0 Grade 0 Chromatograph (ppm) C-3 0 C-5n Cement C-5i C-4n 249' 42.40 00 C-4i 0 13024' Oil / Water Hours 18899' 0.902 Ratio 0 Type Weight Gas Summary 9 5/8" Cht Silt Lst Siltst Cly Max @ ft - Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Avg to Flow In (spm) L/D Whipstock BHA Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Date: Time: - 40# Comments 18899' 18899' 0' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Tuff Gvl 0 Alkal Coal Sh Mud latch up, sheer anchor, hit jars three times to unseat. Service top drive. TOOH t/ 8168'. Pump dry job. Continue TOOH t/ surface. - 0- 0 0 0 0 - - 0 PV Maximum in Units* Ss (current) Mud Type Depth Hycalog SKH616M Report By: 0 0 0 907-685-1490 Unit Phone: 0 J. Failing Logging Engineers: Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / Sherman Report For: AK-AM-0901202813 Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke Condition Failing / Sinn (max) (current) 0 C-2 cP . . * 24 hr Recap: 0 C-2 cP Flow In (gpm) Depth in / out WOB (lb/100ft 2) Size Gallons/stroke Condition Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / Sherman Report For: AK-AM-0901202813 907-685-1490 Unit Phone: 0 J. Failing Logging Engineers: 0 0 (current) Mud Type Depth Hycalog SKH616M Report By: 0 Failing / Sinn (max) (current) 0 - - 0 PV in - 0 0 Run 5.5" liner g/ surface t/ 6323'. Change elevators to 5". M/U Liner hanger. - 0 Tuff Gvl 0 Alkal Coal Sh Mud 40# Comments 18899' 18899' 0' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Date: Time: - Avg to Flow In (spm) M/U Liner Hanger Current -- Max @ ft - Clyst 1 8.75 Milled Tooth XR+ Set At 0.746 Cht Silt Lst Siltst Cly Ss 0 Type Weight Gas Summary 9 5/8" 00 C-4i 0 0 Cement C-5i C-4n 249' 42.40 13024' 18899' 0 Chromatograph (ppm) C-3 0 C-5n 1-0-CT-C-X-I-NO-TD C-1 0 Grade 10.0 RPM N/A 120.0 20 5875' 11 Average 0Trip 00 No Trip Gas 100% Gas In Air Background =10,000 Units Connection - (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 - TFA 8.75 13024' 12737' Bit # Hours 0.902 Maximum Units* 8.80 Bit Type Footage out (sec/qt) FazePro Size 52 - 33000.0 ml/30min 2.34 1.80 71-29 Oil / Water Ratio MWD Summary YP Max Avg Mud Data Depth HTHP Density (ppg) Min Viscosity 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max - Morning Report Report # 22 Customer: Well: Area: Location: Rig: 7-Apr-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: L/D whipstock retrieval BHA. Service rig. Test BOPs. R/D testing equipment. M/U linger hanger BHA. Prep floor. Casing Summary Lithology (%) - 18899' 2 Minimum Depth . . * 24 hr Recap: 18899' 2 Minimum Depth Continue M/U liner hanger. Change elevators. TIH w/ 5.5" liner on 4.5" and 5" drill pipe. Rotate f/ 17000-18899'. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 23 Customer: Well: Area: Location: Rig: 8-Apr-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max -MWD Summary YP MaxAvg Mud Data Depth HTHPDensity (ppg) Min Viscosity - 45000.0 ml/30min Oil / Water Ratio Footage out (sec/qt) KCL Brine Size 27 Maximum Units* 8.70 Bit Type Casing Summary Lithology (%) - TFA 8.75 13024' 12737' Bit # Hours 0.902 (max) TOW @ 12737'BOW @ 12754'Hydril 563 2.90 10 40 L-80 -10,000 UnitsConnection- Max gas while displacing to production brine: 15 units brine. L/D Drill pipe. 100% Gas In AirBackground=15Trip 0 120.05875' Average 0 0 0 Chromatograph (ppm) C-3 0 C-5nC-4n 249' 42.40 13024' 18899' C-1 Grade 10.0 0 C-4i 0 0 C-5i Weight Gas Summary 9 5/8" CementCht Silt LstSiltst ClySs Max @ ft - Clyst 1 8.75Milled Tooth XR+ Set At 0.746 Avg to Flow In (spm) L/D drill pipe Current -- Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Date: Time: - 40# Comments 18899' 18899' 0' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA TuffGvl 0 Alkal CoalSh Mud P/U, breakout, drop and pump ball. Set hanger @ 12525' MD. Test t/ 1500 psi for 15 mins. TOOH t/ 12465'. Displace t/ production - 0- 0 00 00 - - 0 PV in (current) Mud TypeDepth Hycalog SKH616M Report By: 0 Failing / Sinn (max)(current) 0 0 907-685-1490Unit Phone: 0 J. FailingLogging Engineers: Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901202813 (lb/100ft2) Size Gallons/stroke Condition Type 1-0-CT-C-X-I-NO-TD RPM 0 C-2 cP Flow In (gpm) Depth in / out WOB . . * 24 hr Recap: C-2 cP Flow In (gpm) Depth in / out WOB Size Gallons/stroke Condition Type 1-0-CT-C-X-I-NO-TD RPM Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901202813 0 J. FailingLogging Engineers: 0 907-685-1490Unit Phone: 0 (current) Mud TypeDepth Hycalog SKH616M Report By: 0 Failing / Sinn (max)(current) 0 - - 0 PV in - 0 00 0 0 drive. TIH t/ 9700'. Circulate and condition mud - pump bottoms up. Continue L/D drill pipe t/ surface. L/D liner running BHA. - 0 Sh Mud(lb/100ft2) TuffGvl 0 Alkal Coal 18899' 18899' 0' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Date: Time: - Avg to Flow In (spm) L/D drill pipe Current -- Max @ ft - Clyst 1 8.75Milled Tooth XR+ Set At 0.746 CementCht Silt LstSiltst Cly C-5i Gas Summary 42.40 13024' 18899' C-1 Grade 10.0 C-4iC-3 0 C-5nC-4n 0 00 0 Chromatograph (ppm) 120.05875' Average 0 Trip 0 0 Max gas while circulating: 6 units M/U mule on 5" drill pipe. TIH t/ 2660'. Pump citric pill t/ flush OBM f/ pipe. Blow down top drive. Continue L/D 5" drill pipe. 100% Gas In AirBackground=-10,000 UnitsConnection BOW @ 12754'Hydril 563 2.90 10 40 L-80 249' Weight 40# Comments 13024' 12737' Bit # Hours 0.902 (max) TOW @ 12737' - 6 8.70 Bit Type Casing Summary Lithology (%) - 8.75 Footage out (sec/qt) KCL Brine Size 27 TFA - 45000.0 ml/30min Oil / Water Ratio MWD Summary YP MaxAvg Mud Data Depth HTHPDensity (ppg) Min Viscosity 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max - Morning Report Report # 24 Customer: Well: Area: Location: Rig: 9-Apr-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: L/D 5" drill pipe t/ 6230'. TIH w/ 4.5" drill pipe t/ 7990'. Circulate and condition mud - pump citric pill. Service top 18899' 2 Minimum Depth Maximum Units* 9 5/8" Ss . . * 24 hr Recap: 18899' 2 Minimum Depth Maximum Units* 9 5/8" Ss Lay down 5" drill pipe from 2660' MD to surface. Install and remove wear bushing. Clean rig floor. Service rig. - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: ECD (ppg) Tools Morning Report Report # 25 Customer: Well: Area: Location: Rig: 10-Apr-2014 12:00 AM Job No.: Daily Charges: 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max - MaxAvg Mud Data Depth HTHPDensity (ppg) Min Viscosity - 45000.0 ml/30min Oil / Water Ratio YP Footage out (sec/qt) KCL Brine Size 27 TFA 8.70 Bit Type Casing Summary Lithology (%) - 8.75 13024' 12737' Bit # Hours 0.902 (max) TOW @ 12737' -N/A BOW @ 12754'Hydril 563 2.90 10 40 L-80 249' Weight 40# Comments Connection No significant gas 100% Gas In AirBackground=Trip 0 0 -10,000 Units 120.05875' Average 0 0 0 Chromatograph (ppm) C-3 0 C-5nC-4n 0 0 42.40 13024' 18899' C-1 Grade 10.0 C-4i Gas Summary Cht Silt LstSiltstCly 1 8.75Milled Tooth XR+ Set At 0.746 Current -- Max @ ft - MWD Summary Date: Time: - Avg to Flow In (spm) RIH ESP 18899' 18899' 0' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Yesterday's Depth: Current Depth: 24 Hour Progress: 0 Alkal CoalClyst Cement (lb/100ft2) TuffGvl - Make up shroud and pump assemblies. Set pump. Test tools. Pull test tools. Make up pump. - 0- 0 00 0 0 0 - - 0 PV in (current) Mud TypeDepth Hycalog SKH616M Report By: 0 Failing / Sinn (max)(current) 0 907-685-1490Unit Phone: 0 0 C. SinnLogging Engineers: Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901202813 Size Gallons/stroke Condition Type 1-0-CT-C-X-I-NO-TD RPM Mud C-2 cP Flow In (gpm) Depth in / out WOB Sh SPP (psi) C-5i . . * 24 hr Recap: Flow In (gpm) Depth in / out WOB Sh SPP (psi) C-5i Condition Type 1-0-CT-C-X-I-NO-TD RPM MudcP Eni Petroleum Nabors 245E OP18-08L1 Nikaitchuq Field Oliktok Point Perry / RuminerReport For: AK-AM-0901202813 Logging Engineers: C-2 907-685-1490Unit Phone: 0 C. Sinn (current) Mud TypeDepth Hycalog SKH616M Report By: 0 Failing / Sinn (max)(current) 0 - - 0 PV in - 0 00 0 0 Make up shroud and pump assemblies. Set pumps. Test tools. Pull test tools. Make up pump. - 0 (lb/100ft2) TuffGvl - 0 Alkal CoalClyst Cement 18899' 18899' 0' Lime (lb/bbl) 1-1-WT-A-E-I-NO-BHA Yesterday's Depth: Current Depth: 24 Hour Progress: MWD Summary Date: Time: - Avg to Flow In (spm) RIH ESP Pump Gallons/stroke Current -- Max @ ft - 1 8.75Milled Tooth XR+ Set At 0.746 Size LstSiltstCly Gas Summary Cht Silt 42.40 13024' 18899' C-1 Grade 10.0 C-4iC-3 0 C-5nC-4n 0 0 00 0 Chromatograph (ppm) 120.05875' Average 0 0 0 -10,000 Units Max gas while circulating: 8 units 100% Gas In AirBackground=ConnectionTrip 0 BOW @ 12754'Hydril 563 2.90 10 40 L-80 249' Weight 40# Comments 13024' 12737' Bit # Hours 0.902 (max) TOW @ 12737' -8 8.70 Bit Type Casing Summary Lithology (%) - 8.75 Footage out (sec/qt) KCL Brine Size 27 TFA 45000.0 ml/30min Oil / Water Ratio YP MaxAvg Mud Data Depth HTHPDensity (ppg) Min Viscosity - 96% mg/L Total Charges: Rig Activity: - Chlorides - 24 hr Max - Morning Report Report # 26 Customer: Well: Area: Location: Rig: 11-Apr-2014 12:00 AM Job No.: Daily Charges: ECD (ppg) Tools - ROP ROP (ft/hr) 4.23 @ Current Pump & Flow Data: Lay down 5" drill pipe from 2600' MD to surface. Install and remove wear bushing. Clean rig floor. Service rig. 18899' 2 Minimum Depth Maximum Units* 9 5/8" Ss WELL INFORMATION Created On : May 28 2014 Customer :Eni Petroluem Well Name :OP18-08L1 Job Number :AK-XX-0901202813 Rig Name :Nabors 245 Field Name :Nikaitchuq Country :USA Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 12681.00 85.28 295.42 3475.39 4,886.40 N 10,150.69 W (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 12737.00 85.26 294.97 3,480.01 4,910.16 N 10,201.19 W 11248.69 0.80 12800.87 85.24 291.79 3,485.30 4,935.41 N 10,259.61 W 11311.58 4.96 12896.07 90.47 287.97 3,488.86 4,967.74 N 10,349.03 W 11404.47 6.80 12959.40 91.59 283.05 3,487.72 4,984.67 N 10,410.02 W 11465.10 7.97 12991.27 90.93 281.08 3,487.02 4,991.33 N 10,441.18 W 11495.01 6.52 13086.85 90.47 280.05 3,485.85 5,008.85 N 10,535.13 W 11583.85 1.18 13182.62 90.54 282.34 3,485.01 5,027.44 N 10,629.07 W 11673.25 2.39 13278.47 90.62 285.04 3,484.04 5,050.12 N 10,722.18 W 11764.13 2.82 13374.32 91.17 288.17 3,482.54 5,077.51 N 10,814.01 W 11856.43 3.32 13470.19 90.35 291.05 3,481.27 5,109.68 N 10,904.30 W 11949.97 3.12 13565.12 90.69 292.29 3,480.41 5,144.73 N 10,992.52 W 12043.30 1.35 13660.85 90.52 293.83 3,479.40 5,182.22 N 11,080.59 W 12137.80 1.62 13756.62 91.10 295.65 3,478.04 5,222.30 N 11,167.56 W 12232.75 1.99 13852.40 90.97 294.96 3,476.31 5,263.23 N 11,254.13 W 12327.82 0.73 13947.99 90.91 293.97 3,474.75 5,302.81 N 11,341.13 W 12422.53 1.04 14043.49 90.87 292.17 3,473.26 5,340.23 N 11,428.98 W 12516.80 1.89 14138.81 91.44 291.55 3,471.34 5,375.71 N 11,517.42 W 12610.55 0.88 14234.62 92.43 291.86 3,468.11 5,411.12 N 11,606.39 W 12704.71 1.08 14330.38 91.00 292.77 3,465.24 5,447.46 N 11,694.93 W 12799.00 1.77 14426.14 88.92 292.27 3,465.31 5,484.14 N 11,783.39 W 12893.39 2.23 14521.98 88.22 292.07 3,467.70 5,520.29 N 11,872.11 W 12987.74 0.76 14617.38 90.36 290.53 3,468.88 5,554.94 N 11,960.98 W 13081.40 2.76 14712.93 88.94 291.14 3,469.46 5,588.92 N 12,050.28 W 13175.07 1.62 14808.69 88.89 292.50 3,471.28 5,624.51 N 12,139.16 W 13269.24 1.42 14904.50 91.01 295.10 3,471.36 5,663.17 N 12,226.81 W 13364.01 3.50 15000.18 92.05 296.73 3,468.81 5,704.97 N 12,312.84 W 13459.08 2.02 15095.90 91.85 300.09 3,465.55 5,750.48 N 12,396.97 W 13554.52 3.51 15191.79 91.87 303.65 3,462.44 5,801.07 N 12,478.34 W 13650.34 3.71 15287.37 91.45 305.80 3,459.67 5,855.49 N 12,556.86 W 13745.79 2.29 15383.05 91.24 305.56 3,457.42 5,911.28 N 12,634.56 W 13841.26 0.33 15478.87 90.42 305.65 3,456.03 5,967.06 N 12,712.46 W 13936.90 0.86 INSITE V8.0.20 Page 1Job No:AK-XX-0901202813 Well Name:OP18-08L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 15574.11 91.11 305.91 3,454.76 6,022.74 N 12,789.72 W 14031.95 0.77 15669.88 90.62 305.96 3,453.31 6,078.94 N 12,867.25 W 14127.50 0.51 15765.73 91.70 305.94 3,451.37 6,135.20 N 12,944.83 W 14223.13 1.13 15861.56 94.16 305.85 3,446.48 6,191.30 N 13,022.35 W 14318.63 2.57 15957.54 92.93 306.54 3,440.54 6,247.87 N 13,099.66 W 14414.19 1.47 16053.10 90.36 305.94 3,437.80 6,304.34 N 13,176.69 W 14509.46 2.76 16148.72 91.10 306.22 3,436.58 6,360.64 N 13,253.97 W 14604.85 0.83 16244.42 90.93 307.85 3,434.89 6,418.27 N 13,330.35 W 14700.19 1.71 16340.33 90.26 309.12 3,433.89 6,477.95 N 13,405.42 W 14795.52 1.50 16436.11 89.67 309.99 3,433.95 6,538.95 N 13,479.26 W 14890.51 1.10 16531.87 88.86 310.87 3,435.18 6,601.04 N 13,552.15 W 14985.28 1.25 16627.77 87.08 310.17 3,438.57 6,663.31 N 13,625.00 W 15080.10 1.99 16723.54 86.98 310.41 3,443.54 6,725.16 N 13,697.95 W 15174.79 0.27 16818.26 86.50 310.46 3,448.92 6,786.49 N 13,769.93 W 15268.38 0.51 16914.19 89.95 309.69 3,451.89 6,848.21 N 13,843.29 W 15363.35 3.68 17010.14 94.30 310.79 3,448.34 6,910.13 N 13,916.47 W 15458.26 4.68 17106.10 96.99 311.27 3,438.90 6,972.81 N 13,988.50 W 15552.62 2.85 17201.96 95.65 312.79 3,428.34 7,036.60 N 14,059.26 W 15646.49 2.11 17297.25 91.72 313.94 3,422.22 7,101.88 N 14,128.38 W 15739.77 4.30 17392.89 90.86 313.65 3,420.07 7,168.06 N 14,197.40 W 15833.43 0.95 17488.83 89.84 312.46 3,419.48 7,233.55 N 14,267.50 W 15927.65 1.63 17584.68 88.53 312.48 3,420.85 7,298.26 N 14,338.19 W 16021.95 1.37 17680.55 89.01 311.29 3,422.90 7,362.25 N 14,409.55 W 16116.43 1.34 17776.33 89.90 310.97 3,423.81 7,425.25 N 14,481.69 W 16211.04 0.99 17871.95 92.15 310.82 3,422.10 7,487.84 N 14,553.95 W 16305.54 2.36 17967.91 89.99 311.29 3,420.31 7,550.85 N 14,626.29 W 16400.34 2.30 18063.82 88.63 311.37 3,421.47 7,614.18 N 14,698.31 W 16495.02 1.42 18159.63 87.40 311.45 3,424.79 7,677.51 N 14,770.12 W 16589.54 1.29 18255.40 88.56 310.96 3,428.16 7,740.56 N 14,842.13 W 16684.07 1.31 18351.17 90.80 310.68 3,428.70 7,803.16 N 14,914.60 W 16778.75 2.36 18446.98 91.47 309.45 3,426.80 7,864.81 N 14,987.91 W 16873.64 1.46 18542.70 91.33 310.67 3,424.46 7,926.40 N 15,061.14 W 16968.43 1.28 18638.51 89.22 310.33 3,424.00 7,988.62 N 15,133.99 W 17063.23 2.23 18734.50 88.04 310.04 3,426.30 8,050.54 N 15,207.30 W 17158.26 1.27 18830.76 90.01 309.70 3,427.93 8,112.23 N 15,281.17 W 17253.64 2.08 18899.00 90.01 309.70 3,427.92 8,155.82 N 15,333.67 W 17321.29 0.00 INSITE V8.0.20 Page 2Job No:AK-XX-0901202813 Well Name:OP18-08L1 Survey Report DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 302.20 degrees (True) - A total correction of 0.00 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 18,899.00 feet is 17,367.76 feet along 298.01 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.20 Page 3Job No:AK-XX-0901202813 Well Name:OP18-08L1 Survey Report