Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-028STATE OF ALASKA ALASKA OIL AND GAR rnnnnniccinni APR 3 0 217111 101 Form 10-407 Revised 5/2017�, CONTINUED ON P GE 2 Submit ORIGINAL onl C'Dw 114t)62-0 7'( ��li4 RBDMS� MAY 0 12019 �f(; - - - -- - ...I..._.... III",,,,.,,..,,. --. WELL COMPLETION OR RECOMPLETION REPORT ANJk 1a. WeII Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended0 1b. WeII Class: 20MC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAGE) WDSPL ❑ No. of Completions: 2. Operator Name: 6. Date Comp., Susp., or Great Bear Petroleum Abend.: 4/7/2019 3. Address: 7. Date Spudded: Development ❑ Exploratory O Service ❑ Stratigraphic Test ❑ 14. Permit to Drill Number/ Sundry: 214-208 3/ 7 -I,f(, 3/7-oY1 15. API mber: 310 K Street Suite 200, Anchoraged AK 99501 2/10/2015 VNO 50-23-20029-00-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 4,351 FEL, 2,995 FSL Section 23 Township 7N Range 13E 3/20/2015 Alkaid #1 Top of Productive Interval: 9. Ref Elevations: KB: 217.8' 17. Field / Pool(s): 4,451 FEL, 3,906 FSL Section 23 Township 7N Range 13E GL: 196.3' Exploration Total Depth: 4,451 FEL, 3,930 FSL Section 23 Township 7N Range 13E 10. Plug Back Depth MD/TVD: 18. 5,243 MD Property Designation: ADL 391704 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 646,733.48 y- 5,831,834.22 Zone- 5 11. Total Depth MD[TVD: 19. 8,595 MD / 8,465 TVD DNR Approval Number: LONS 14-010 TPI: x- 646,615.42 y- 5,832,742.70 Zone- 5 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/fVD: Total Depth: x- 646,615.31 y- 5,832,766.87 Zone- 5 N/A 1720 MD/TVD 5. Directional or Inclination Survey: Yes U (attached) No Q Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: 21. N/A (ft MSL) Re-drill/Lateral Top Window MD/fVD: N/A 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary CBL 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE AMOUNT SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD CASING FT. TOP BOTTOM TOP BOTTOM PULLED 20" 129.45 X-56 21.5 101.5 21.5 1101.5 26' Driven last 32' and Grounded 10.75 45.5 L-80 21.5 3,331 21.5 3,331 13.5 2 stages, 909 bbl 7.625 29.7 L-80 21.5 8,560 21.5 8,485 9.875 2 stages, 192 bbl 24. Open to production or injection? Yes No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Per d): Perforations at 8,406-8,414, 6 SPF 3/6/2019 SIZE DEPTH SET (MD) PACKER SET (MD/fVD) 27/8" 3,485 N/A 6,158-8,164, 6 SPF, 60 deg 3/15/2019 S��54M 8,062-8,083, 6 SPF, 60 deg 3/27/201Was 5,378-5,398, 6 SPF, 60 deg 3/27/2019 D TE 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. hydraulic fracturing used during completion? Yes ✓ No tt �- Z0 (4 Per 20 AAC 25.283 (i)(2) attach electronic and printed information VERIFIED . _ DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 8,158-8,164 77,000 lbs proppant 27. PRODUCTION TEST Date First Production: - Method of Operation (Flowing, gas lift, etc.): 3/20/2019 as lift Date of Test: 3/20-3/24 Hours Tested: Zy Production for Oil -Bbl: Test PeriodI (Q $ 100 Gas -MCF: Water -Bbl: #Gy 19W 7various C6 Choke Size: Gas -Oil Ratio: 0.8 Flow Tubing Press. 150 Casinq Press: 0 Calculated Oil -Bbl: 24 -Hour Rate 108 100 Gas -MCF: Water -Bbl: 300 Oil Gravity - API (corr): 38 101 Form 10-407 Revised 5/2017�, CONTINUED ON P GE 2 Submit ORIGINAL onl C'Dw 114t)62-0 7'( ��li4 RBDMS� MAY 0 12019 �f(; 28. CORE DATA Conventional Core(s): Yes ❑ No ❑Z Sidewall Cores: Yes ❑ No 0 If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes Q No ❑ If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surficial Deposits/ Sagavanirkto 23 23 Attach separate pages to this form, if needed, and submit detailed test Mikkelston Tongue, Caning Fm 608 608 information, including reports, per 20 AAC 25.071. Permafrost - Base 1600 1600 Staines Tongue, Sagavanirkto 2213 2213 Upper Shcrader Bluff 5260 5220 West Sak Sandstone 5374 5330 Canning Fm 6393 6311 Middle Schrader Bluff 7219 7115 Middle Schrader Bluff Seismic 8045 7936 Formation at total depth: 31. List of Attachments: Summary of Daily Operations, Wellbore Schematic, Production Test Report, Stimulation Post Job Report, 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Patrick S. Galvin Contact Name: Michael Duncan Authorized Title: Chief Commercial Officer Contact Email: michael@greatbearpetro.com Authorized ! / Contact Phone: 817-240-3865 Signature: Date: INS RU IONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other.(explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only VW6rmt6mr ETROLEUM 3705 Arctic Blvd, Suite 2324 Anchorage, AK 99503 (907)868-8070 April 30, 2019 Guy Schwartz, Senior Petroleum Engineer Alaska Oil and Gas Conservation Commission 333 W. 7th Ave., Ste, 100 Anchorage, Alaska 99501 RE: Delivery of Completion Report Alkaid # 1 - Re-entry and Test Dear Guy: Accompanying this letter are paper and electronic copies of the documents that make up the Completion Report for the recently completed Re-entry and Test of Alkaid # 1. The documents listed below are in hard copy and contained on the included thumb drive: • Form 10-407 • Wellbore schematic • Full set of Daily Completion Reports • Hydraulic Fracture Post Job Report • Test Production Report Please let me know if there is any additional data or information you need regarding this project. Sincerely yours, Great Bear Petroleum Operating LLC Patrick S. Galvin Chief Commercial Officer & General Counsel Signature ACKNOWLEDGEMENT OF RECEIPT Date Printed Name Alkaid #1 Wellbore schematic, Suspended condition o -u7 ins 70 bbl diesel Conductor Surface Hole Bit Size 123/4 Casing Depth 3,331 Casing Size 103/4 in 3331' Weight: 45.5 Ib/ft 76.5 bbl diesel Grade: L-80 I I Cemented head to toe Freeze Protect String 27/8 I /joUps` I String Depth 3,551 Weight: 6.5 Connections HYD 563 Cement pug tagged at 5,243 I West Sak 5,370'- 5,460' j Test Perforations 5,378-5,398 Cement Plug tagged at 7,833 I ;TOC 5,775 Production Hole Bit Size 95/8 I Casing Depth 8,595 Casing Size 75/8 in Weight: 29.7 Ib/ft I Grade: L-80 I ' Packer 8115 Frac Perforations 8,158-8,164 Cement Retainer 8,390 Block Squeeze Perfs 8,408-8,414 oe Track, 8,450' 8,595' TD wsmr I PETROLEUM Alkaid Daily Completion Report WELL: Alkak Mt CONTRACTOR: All Amskum OilfnM RIG: RIg111 RPT DATE: 4RQ019 ACTIVITY. Rig Down SPUD DATE: DRILLING SUPERVISOR I: Pat SHewad AFEM: 2019A22 1 API M:50-22320029-00-00 DFS: DRILLING SUPERVISOR 2: Wil,Mbns LEASE: AOL 391704 REPORT NO: 41 TOOLPUSHERI: Ed Castagne FIELD: wiri at DOL: TOOLPUSHER2: ELEV: RKB: 17.50 LpSTBOPTE8T: 3/262019 RIG PHONE M: 907-802-4045 MD: 8,595 ND: 8,485 NEXT BOP TEST: 4/272019 LAST SHOE TEST DATE: SHOE TEST: 34 HR FTG: HRS DRLD, CSGHD: AFEAMOUNT: AFECUM. 24 HOUR Post, moving support equipment OXlocalion. Chip pad. Secure enhance to ice food. SUMMARY ACTIVITY PLANNED FROM TO HRS OPERATIONS 6:00 1800 12.0 TV moving suppml equl,mentmf IDcation.Chi, pad and bad into cuttings boxes. Tarp and iostalwell and on well bead. Hob whinge home at Cmz. Take sample of chips for sampb to manges/. Pulldellneahars. Berm gwkb snow, entrance to be road Wsecure X. TOTALHRS 12.0 MORNING UPDATE jDahver matted sample ofwaherha Ansic Foxforanalysk, MUD RECORD MUD Wale,-Based MUD 2 Water-Based OPERATIONAL TIME SUMMARY PERSONNELONSITE TIME 1800 ACTIVI"Y DAILY CUMHRS COMPANY NUMBER FLOWUNE TEMP (°F) -RIGUPIOOWN GREAT BEAR 2 DEPMUD LLING PTS 2 T/(fl WEIGHT/TEMP MUD WEIGHNEMP (b/gap 8.5 MING CRUZ 3 60LM6 (%VoQ ING FUNNEL VISCOSITY (sloe CULATE 8 CONDITION !TRIPMPING RHEOLOGY TEMP (°F) PINGR60O/R300 VICE RIGR20O 8100 NTIME /CUT DRILLING LINERELINE SURVEYS YP Qb1100 W, 11- LOGGING OIUWATER(%Vop 12- RUN CASING/CEMENT 1Os1Io con GELS (IW100ft" 13-WAIT ON CEMENT API FLUID LOSS (ccGgmin) 14 - NIPPLE ON UPIDOM BOP'S HTHP FLUID LOSS (crADmin) 15 -TEST BOP'S CAKE APTMH" (1132, 16-DRILL STEM TEST UNC RET60LIDS (%VOp 17- PLUG BACK CORRECT SOLIDS(%Vop 18-SQUEEZE CEMENT ifl OIL (XVop 19 - FISHING UNCORR WATER(%Vop 20-DIRECTIONALWCRK OIf7WATER RATIO 21-MISCELLANEOUS ALKAL MUD (Pam) 22- MEETINGS cL WHOLE MUD (m,&) 23- WELL CONTROL SALT MIN` 24-COMPLETION LIME pwbbp 25- COMPLETION(STANDBY) TOTAL 7 EMULSTABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND (%Vop RIG FUEL ECD (ppg) SUPPORT FUEL FLOW IN (gpon) TOTAL FUEL PUMP PRES (pa) ROP TP.) MOT jwoYI HSE ,HREMP SAFETYMEETINGS BEAR SIGHTINGS: None Pvf(0) 1) 2) OTHER WILDLIFE: None CHLORIDES (m91q ACCIDENTS: None 'SPILLS: None HARDNESS (Ca++) WEATHER DAILYHIGH 6°F DAILY LOW -e'F CASING OD WT GRAOE MD ND MAXWINDIDIR NE 20 MAX WINO CHILL 38°F Sumece 10.75 45.5 3331 PRECIPITATION None VISIBILTY 1000 m1 Inhemsediate 7.625 29 8595 COMMENTS None BHA DESCRIPTION LENGTH BHA. WTAIR "HAW, MUG HRS.ON JARS ROT Wf. P.0 VJT SO WT. TORGUE BIT DATA NO. SIZE MAKE TYPE BERNO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP OP(ANMNEL7 DC(ANN.NEL) BIT NO I I INNER I I OUTER1 PULL I GAUGE I I OTHER I IRPI HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AVD BITHHP PUMPHHP 1 2 PRESSURE PARAMETERS POREPRESSURE: IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: TRIP: FORMATION: Q %2 SHOWDEPTHS NOPBebmMunnBAber GAS MUD WT. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD NIS COORDINATES EW V. SECTION DLS vxws Iw.ne WalI&lnblmAon ManagememUC ver 051315M �°1f� Et V��w UM Alkaid Daily Completion Report WELL: Alhaitl#1 CONTRACTOR: AIIAmaRcan Wreld RIG: Rig Ill ACT IF Rg Oown RPT DATE: 45YZ01;AM3917� SPUD DATE: GRILLING 9UPERVIS0R 1: Pat Stewart 2019A22 API .223-3002ADo-00 DFB: DRILLING SUPERVISOR 2: Mede Mims 04 REPORT NO: 40TOOLPUSHERI: Joe Siber DOL: T00LPUSHER2: EdCastagne 1].50 LASTBOPTEST. 3I26I2019 RIG PHONE#: 90]-8024045 !L�E- 0$958,605 NE%T BOP TEST: 4/2/2019 LAST SHOE TEST GATE: SHOE TEST: : CSGHD: AFE AMOUNT: AFECUM.Rgo wn p. Move of AlkaM to Peak 4gM tlW,yaltl. C0n0nue moving support equipment gRlpcatlon. Fin.I moving Oruz Man CampoRbca0on. ACTIVIN Fmisb moving support equipment of l0cation. Chipped Become to ice mad. PUNNE0 FROM TO HRS 0PERATI0N9 0:00 600 24.0 Rigd wnp8sandsubbe5e. Mmm.fABaMIOPBakiigNdutyyaN. Continue moving support equipment of location. Finish moving Cruz Man Camp off location. TOTAL HRS 24.6 MORNING UPDATE JR09mg down and moving ofwall. MUD RECORD MU01 Wai ased MUD21tiater-Based OPERATIONAL TIME SUMMARYPERSONNELONSITE TIME 18:00 ACTIVITY OgILY CUM HIRE COMPANY NUMBER FLOWLINE TEMP FF) 1 -RIG UPIDOWN GREgT BEAR 3 OEPTH/ND(g) 2 -DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGTT/TEMP abIga0 I 85 3 -REAMING CRUZ SOLIDS ( 4 -CORING PTS 2 FUNNEL VISC VIBCOSIN(slgl) 5-CIRCUUTE&CONINTION RHEOLOGY TEMP (°F) a - TRIPPING R800/R300 ] - SERVICE RIG R200IR100 9 -DOWNTIME R6TO 9-SLIP/CUT DRILLING LINE PV (W) 10 - WIRELINE SURVEYS YP (b/1I0 flf 11 -LOGGING OILAVATER (%VOA 12- RUN CASING/CEMENT t0aH0m130m GELS (WICOR 13 - WAR ON CEMENT API FLUID LOSS (c=nfird 1 14 -NIPPLE ON UP/DOWN BOP'S HTHP FLUIDLOSS KeGOmin) 15 -TEST BOP'S CAKE APT/HT (1p2'7 16 - DRILL STEM TEST UNC RET SOLIDS (%Vo0 1]- PLUG BACK CORRECT SOLIDS(%Vo0 16 -SQUEEZE CEMENT OIL (%Vo) 19- FISHING UNCORR WATER(%Vol, 20 -DIRECTIONAL WORK OILWATER RATIO 21 -MISCELLANEOUS ALKAL MUD (Pom) 22- MEETINGS CL WHOLE MUD (mg&) 23 - WELL CONTROL SALT(%WV) 24 -COMPLETION LIME (bmb0 25 -COMPLETION (STANDBY) TOTAL 22 EMULN STABILI CONSUMABLES START RECEIVED USED TODAYS INV. (%Vol) SANG (%VOA RIG FUEL ECD (pIS) SUPPORTFVEL 3,140 400 2,746 FLOW IN (I TOTAL FUEL 3,146 40C 2,746 PUMP PRES (ps) ROP (FPH) MBT (IWbb9 H as 9E pH?EMP SAFETYMEETINGS SIGHNGS: None PfMf (0) 1) 2) LTL FE: OTHER W None CHLORIDES (MOIL) gCCIDENTS: None SPILLS: None HARDNESS(C... ) HER OAILYHIGH I DAILY LOW -6°F LASNG OD WT GRADE MO NO MAX WINDIOIR NE 20 IMAXWIND CHILL 1 -26 •F Surface 1075 455 3331 PRECIPITATION None VISIBILTY 10.00 mi IMarmndifle 7.625 29 6595 COMMENTS I None BHA DESCRIPTION LENGTH BHA. WT AIR BHq WT. MUO HRS. ON JARS ROT Wi. IU WT SO WT. TORQUE BIT DATA NO. SIZE NUUKE77�TYPE SERNO. NOZZLES RR IN OUT FEET HRS WOE RPM FOR DP(ANNNEL) OC(ANN.NEL) BITNO I NJNER I OUTER1 DULL LOC 3EPL GgUOE OTiFA RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD 1 AVDP AVDCI BITHHP PUMP HHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: REDUCED PUMP RATES BG: MAK: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CI_ Al TRIP: FORMATION: 42 SHOWDEPTHS ROP Bata.INMB Aft, GAS MUDWL CHLORIDES REMARKS SURVEY DATA MD ANGLE AZIMUTH TVD NIS COORDINATES ENJ V. SECTION OLS xeN—t WWII@Inlwma0an A nagemen[LLC ver_06131W Ell R Ot� GIM Alkaid Daily Completion Report WELL;j Atli CONTRACTOR: AO American OilfeM I RIG: Rip N1 RPT DATE: 4/52019 ACTIVTY: Rig Down SPUD DATE: DRILLING SUPERVISOR I: Pat Stewed AFE #: 2019A22 3.2 qPl k: 59-22002800.00 DFS: DRILLING SUPERVISOR 2: Lonnie Dmllinger LEASE:1 ADL 391704 REPORTNO: 39 I TOOLPU8HER 1: Joe Steiner FlELD;j WId.t DOIa TOOLPUSHER 3: Ed Castagna El-1 JIRKS: 1 17,60 LAST BOP TEST: 326/2019 I RIG PHONE p: 987-8021945 MD: 8,595 rv0: 8,485 NEXT BOP TEST: 4/2/2019 LAST SHOE TEST GATE: SHOE TEST: T4 HR FTG: RaDRLG: CSGHD: AFE AMOUNT: AFECUM. 24HOUR Rig down utdily section, move off Allaq to Peak lgbt duly yam. Begin demobllbing Cmz Man Camp. SUMMARY Move supyod equipment off looatun. ACTIVITY Railer rig down and on offweL PLANNED FROM TO HRS OPERATIONS 6:00 6:00 24.0 Rig tlown utiRyseclion, move OffAlk.M tO Peak light duty yam. Begin demobilkng Omz Man Camp. Move supped equipment off kwton. [TOTAL HRS 24.9 MORNING UPDATE lRii,ing down and moving offwell. MUD RECORD MUD1Weter-Based MUD2Water-B,md OPERATIONAL TIME SUMMARY PERSONNELONSITE TIME 18:00TIVITY DAILY CUM HRS COMPANY I NUMBER FLOWLINE TEMP('F) 1-RIG UP/D69 GREATBEAR 3 OEPTH?VD (fl) 2-DRILLING j ALL AMERICAN OILFIELD 14 MUD WEIGHT?EMP(blgap 05 3-REAMING CRUZ 3 SOLIDS (%Vol) NG PTS 2 FUNNEL VISCOSITY (slgl) LATE 6 CONDITION HE TEMP (°F7 ING R600IR300 ICE RIG R200/R100 TIME Zo. R&R3 UT DRILLING LINE PV (cP) LINE SURVEYS YP di,1100 ft GING01 WATER(%Voq CASINGMEMENT Im/IO W30m GELS (IN1 01 13 - WAIT ON CEMENT API FLUID LOSS (cc130min) 14 -NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOSS (r,3Smin) 15 -TEST BOP'S CAKE APTIHT (1/3T) L STEM TEST UNC RET SOLIDS (%V8 BACK CORRECT SOLIDS EZE CEMENT OIL (%Vng INGUNCORR WATER (%VOID CTIONAL WORKOILMATERRATIO i ELLANEOUSALI41LMUD (POm) INGSDL WHOLE MUD (mgt) CONTROL SALT(%W) 24-COMPLETION LIMEOb/bD 25- COMPLETION (STAND" TOTAL 1 22 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%V¢D RIG FUEL 2.525 400 2,125 ECD (pp" SUPPORTFUEL 3,146 400 2,]46 FLOW IN(gpm) TOTAL FUEL 5,871 B00 PUMP PRES per) FOR (FPH) MOT(Idbbl) HSE pHtTEMP SAFETY MEETINGS BEAR SIGHTINGS: None PpMf(0) 1) 2) OTHER WILDLIFE: None CHLORIDES mi ACCIDENTS; None SPILLS: None HARDNESS(Caea) WEATHER 1 DAILYHIGH 1 a°F DAILYLOW -6°F CASING OD WT GRACE MO TVD MAXWINDMIR HE 20 MAX WIND CHILL -20'F Bud.. 10.75 455 3331 PRECIPITATION None VISIBILTY 10.00 m1 Intermediate 7.625 29 8595 COMMENTS I None BHA DESCRIPTION LENGTH I BHA. WT AIR S.UD HRS. ONJARS ROT WI'. P.0 NT S.0 WT. ITORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP OP(ANNAEL) 1 DO(ANN.NEU BRNO. INNER WTER DULL LOC SEPL GAVBE OTHER j RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AVOCI BITHHP PUMPHHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: REDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GPS SHOWS CONN: CL #1 TRIP: FORMATION: 112 SHOWDEPTHS ROPBtlm ftA GAS MUD AT. CHLORIDES REMARKS SURVEY DATA MD ANGLE AZIMUTH TVD NIS COORDINATES EAM V. SECTION OLS —w- WtlI&lnbrmatian M.I.," LLC wr 051315, A&Mt VCflI W°ETR OLEUM Alkaid Daily Completion Report WELL: Alkeid Yt CONTRACTOR: AA American OOfieq RIG: RU 111 RPT GATE: 4/%RO19 ALTNFF. Complete SPUD DATE:I I DRILLING SUPER VISOR ..I Pat Slevlad APE 0:2019A22 API #:50-223-20029-00-00 DFS: DRILLING SUPERVISOR 2: Lonnie DrolBnger LEASE: ADL 39110! REPORT NO: 38 TOOLPUSHERI: Joe Slelnar FIELD: WiRW( DOL: TOOLPUSHER2: EE CastaBne ELEV: RKB: 1]50 LAST BOP TEST: RIG PHONE N: 907.302-4045 MO: 8,595 ND: 8,485 1 NEXTBOPTEST: LAST SHOE TE8T DATE: SHOE TEST; 24 HR FTG: HRS DRLG: GSGHD: qFE AMOUNT: qFE CVM. U HOUR Nipple upend lest Tree.O. up LRHOantlfreezeprotectwe0w8h70BBL oftliesel. Install antl lest BPVfrom IA.Rgdown LRHO. Install VR plugs N UVOA. Secure Tree. RI, Release SUMMARY at 24:00 Hrs. Begin ROMO. ACTIVIN Rg down and move oCwefl. PLANNED FROMI TO I MRS 1 OPERATIONS 600 1200 6.0 NilInstallManPnldforfreezepmtiam Cnwethead. Blowdpwn Steamandsbal Gown bollosftrtbefi0. 12:00 20.00 8.0 RNLRHOand Cmz Fuel True. Pressaretest foesZ"m psi. Pump 70 blue diesel. Albwta U-Tubeferl Hr. Suckbacklines. moll Tooft,1500PSIfrOm IA. Rg down LRHO and Cruz Fuel Track. Clean PIIS While freezepmtec g. 2000 0:00 d 0 Remove Wmpenpn Ranges from IA aM OA. Install VR plugs m IA antl OA. Install BenkNO Plug flanges eM Bauges. FIOeM1 ckening Ha Rg Release at 24DO bra. B.C. 6.00 6.0 Rig tlown rig Poor equpment. Move pipe sM1etls oRlocation. Notes: Diesel Nr keeze ahead puled from supped Net suppy. TOTAL HRS 24.0 MORNING UPDATE Rggin0 down and moving ofwe9. MDD RECORD MUO1 Water Based MUD2Weler-Based OPERATMAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 ACTIVITY DAILY CUMHRS COMPANY NUMBER FLOWLINE TEMP (°F) 1-RIG UPIDOWN GIM TBEAR 3 DEPTHINDdol 1 2-DRILLING ALLAMERICAN OILFIELD 14 MUOWEIGHTITEMP(INgap 8.5 3-REAMING CRUZ 3 SOLIDS(%VA0 4-CORING PTS 2 FUNNEL VISCOSITY (slgU 5-CIRCULATE BCONOITION BHGE 1 RHEOLOGY TEMP CF) 6-TRIPPING R6001R30C 7 -SERVICE RIG R20O1R100 8-DOWNTIME RB/R3 9- SUPIOUT DRILLING LINE PV (do) 10 - WIRELINE SURVEYS YP OW100 f- H - LOGGING 011-WATER (%VSD 12-RUN OASINGICEMENT 10s14Oml30m GELS ON1003n 13- WAIT ON CEMENT API FLUID LOSS (cc30min) 14 - NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOSS (ce'30mtn) 15 -TEST BOP'S CAKE APT/HT (1132') 16-DRILL STEM TEST UNC RET SOLIDS (%VoD 17- PLUG BACK CORRECT SOLIDS(%VoD 18-SQUEEZE CEMENT OIL (%VOD 19-FISHING UNCORR WATER(%Vol) 20- DIRECTIONAL WORK OILANATFR RATIO 21-MISCELLANEOUS ALKAL MUD (Pa.) 22-MEETINGS CL WHOLE MUD (al 1 23- WELL CONTROL SALT 199W) 24-COMPLETION LIME ObIbbD 25-COMPLETION(STANDBY) TOTAL 23 EMUL STABILIN CONSUMABLES START RECEIVED USED TODAYS INV. SAND (%VOD RIG FUEL 2,925 400 2,525 ECD(ppp) SUPPORTFUEL 6,486 3,340 3,146 FLOW IN(I i TOTALFUEL Salt 3.7401 5,671 PUMP PEES (p ) ROP (FP,) MBT(INdbD HSE pIVTEME BAFENMEETINGS BEAR SIGHTINGS: None PUMP (0) 1 21 1 OTHERWILDLIFE I None CHLORIDES (mBIL) ALLIDENTS: I None ISPILLS, I None HARDNESS (Caai) WEATHER I DAILYHIGH I 6 °F DAILYLOW 1 -6 •F CASING OD WT GRgOE MD ND MAR WINDAIR NE 20MAX WIND CHILL 1 -26°F Surface 10.75 45.5 33]1 PRECIPITATION None VISIBILI1 1 10.00 m1 brtermetliale 7825 29 3595 COMMENTS None BHA DESCRIPTION LENGTH BHq. WTAIR BHA Wi MUD HRS. ON JARS ROT NT. P U WT S O WT. TORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANNNEL) DC(ANNNEL) BRNO I INNER I I OUTER DULL I I LOC SEAL I GAUGE OTHER I IRPI HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AV DP AV DC BIT HHP PUMPHHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: IREDUCED PUMP RATES BG'. MAX: REMARKS: PUMP GPM PRESS DEPTH OAS SHOWS CONN: CL: #1 TRIP: FORMATION: #2 SHOWDEPRIS ROP Be rWDunngMer GAG MUD IT CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH WD N5 COORDINATES EW V. SECTION OLE nwrv. Vlez.net WdIE: Information Management LLC e! 0513154 &mt&Ar Alkaid Daily Completion Report ETROLEUM WELL: AlkaiE.i 1 CONTRACTOR:AII American Oiffi RIG: R, 111 RPT DATE: 4132019 ACTNT': Complete SPUD GATE: ORILLINGSUPERVI80R1: Pat Stewart AFE.:2019A22 APL: 50-22}20928-00.011 DFS: DRILLING SUPERVISOR 3: Lonna Dmilinger LEASE:1 ADL 391794 REPORT NO: 3] TOOLPUSHERL Jae Stainer FIELD: W.H.t DOL,j IT00LPUSHER2: Ed Costagne ELEV: ftKB: 11.50 LAST BOP TEST: 3262019 RIG PHONE.: 901-8023945 MD: 5,585 TVD: 6,485 NEXT BOP TEST: OV2019 LAST SHOE TEST DATE: SHOE TEST: 34 HR FTG: HRS DRLG: CSGHD: AFEAMOUNT: AFECUM. 24HOUR Plug void test with AOGOC Pelmasum Inspector Guy Cook. Tag Cement Plug at 5243'. Pressure test Plug to 1500 PSI for 30 Mnutea. Good test Verify tag at 5243', Good. Lay SUMMARY down DP. Land hangerantl RILDS. Set BEV. Nipple down ROPE. Nipple up Tree. Test tree to SK. Good Test. ACTIVITY Freeze pi l well. Install BPV. Test BEV. Set VR Plugs. R, down, move off. PLANNED FROMI TO I HRS I OPERATIONS 6:00 1 0:00 1 2.0 A0GCCPetroleumlrlapedar Guy Cookonlocalion. RIH and tag mmentat5243'. Settlownl0kandreve' wilhseoontlta. Pick_upandriguptapressuretest. test to 1500 Sl inT 311 minutes. Good It, 8:00 9:30 LS R,downhoMpressureteat. RIH and verify tag, tag cement at 5243', set down l Ok. Good. 9:]D 14:90 45 Lay down 60 join OT OP. RIH 3 stantls our at name. 14:00 1600 2.0 Pickup hangerantl RlH. Onenttubing outlet. Lend hanger and RILDS. Test Hanger Seals, Good Install BPV. Tubing tail at 3485' 16:00 3:00 T S Nippledown BOPS. Clean Pits. Blow Down Steam lines. Blow down Water Wes. 300 600 j 3.0 Npple up Tree. Install TAC. Pressure test Tree to SK. Goad. RD Choke and Kill lines. Nates: Plug vadfio ion made by AOGCC Petroleum Inspedor Guy Cook. TOTALHRS 24.0 MORNING UPDATE Continue prepping rig ford, move. Waft on _RHO to heeze pmledwell. MUD RECORD MUD Water-Based MUD Water-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 10:00 ACTIVITY DAILY CUMHRS COMPANY NUMBER FLOWLINE TEMP ('F) 1-RIG UPAOWN GREAT BEAR 4 DEImpi li0 2-DRILLING ALLAMERICAN OILFIELD 14 MUD WEIGHT/TEMP gb/gMp 0.5 1 3-REAMING CRUZ SOUOS (%Vog 4 - CORING PTS 2 FUNNEL VISCOSITY (slgQ 5 -CIRCULATE a CONDITION RHEOLOGY TEMP (°F) a -TRIPPING R"Id"100 7 -SERVICE RIG R200rRtoo 8-DOWNTIME R6M3 9 -SLIP/CUT DRILLING LINE PV(cm) ID- WIRELINE SURVEYS YP doloo W, 11-LOGGING OUNATER (%VoQ i 12-RUN CASING/CEMENT IDyt O..m GELS OW10011taI 13- WAIT ON CEMENT API FLUID LOSS (cc20Mg) 14- NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOSS (cfll0min) 15 -TEST BOP'S CAKE APT/HT (1/32') 16- DRILL STEM TEST UNC RET SOLIDS (%Vog 17- PLUG BACK CORRECT SOLIDS phi 16 - 60UEEZE CEMENT OIL (%vmQ1 19 - FISHING UNCORK WATER (%Vol) 20- DIRECTIONAL WORK OIUWATER RATIO 21- MISCELLANEOUS ALKAL MUD (POM) 1 22 - MEETINGS CL WHOLE MUD (mg)L) 23- WELL CONTROL SALT(%M 24-00MPLETI0N LIME (Hlbbg 25- COMPLETION (STANDBY) TOTAL 23 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAY'S INV. SAND (%Vo6 RIG FUEL 3,]25 409 2,825 EW (ppg) SUPPORTFUEL 6,006 400 6,406 FLOW IN Igpm) TOTAL FUEL 10,211 800 9,N1 PUMP PRES (pop ROP EPH) MBT Sti HSE pHMMP SAFETY MEETINGS BEAR SIGHTINGS: None Floor N) IT 2) OTHEBWILDOFE' Nona CHLORIDES (mi I ACCIDENTS: I None SPILLS: None HARDNESS(Cm,H WEATHER 1 DAILYHIGH I6°F DAILY LOW -0°F CASING GO WT GRADE MO TVD M.WINODIR NE 20 MAX WINO CHILL -20'F 45.5 3331 PRECIPITATION None VISIBILTY 10.00 mi 29 8595 COMMENTS i None BHA M11a,m.diM. DESCRIPTION LENGTH IBHAWTAIR BHA Wi. MUD HRS.ON JARS ROT WT. P.UYJT SO WT. TORQUE BIT DATA NO, 512E MAKE TYPE SER NO, NOZZLES I I i I iOUT FEET HRS WOB RPM ROP DP(ANN.NEL) DC(ANN NEL) BITNO I I NNER OUTER1 DULL 1LOC SE4 GOUGE OTHER RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECO AVDP IAVD BIT HHP PUMPHHP 1 Z PRESSURE PARAMETERS PORE PRESSURE: REDUCED PUMP RATES BG: MAX: REMARKS I PUMP I SPM I PRESS DEPTH GAS SHOWS CONN: CL: 1 #1 TRIP: FORMATION: ill SHOWDEPTHS ROP BeImelDenng a r GAS MUD WT. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD NIS COORDINATES EAv V. SECTION DLS rwa lu mt Well a lnkrmaton Management LLC Vx 01315M &mt VGII/ Alkaid Daily Completion Report r^E7ROLEUM WELL: Alkaid kt CONTRACTOR: Ag American OifieM RIG: Re, 111 RPT OATS: 42(1019 ACTNITY: Complete BPUO GATE: GRILLING SUPERVISOR I: Pet Stewart AATE 2O18A22 API C: 50-223-20029-00-00 GFS: GRILLING SUPERVISOR 2: LonnM Devold LEASE: ALL am 104 REPORT NO: 38 TOOLPUSHER is Joe Steiner FIELD: WHcat I DOL TOOLcn—F. 2: Ed Castagna ELEV. RKB: 1>.W LASTBOPTEST. 326Y1019 RIG PHONE V: 907-802-9045 MD: 8,593 ND: 0,485I NEXT BOP TEST: 42/2019 LASTSHOETESTDATE: "OE TEST: 24 HR FTG: HRSORLG: CSGHO: AFEAMOUNT: TE CUM. 24HOUR RgupCSnwmrs,PRssmetest Wes. Pump 8 BOL 12 PPG Viscous PN and displace wM 31.4 BBL 0.0 PPG MCI Brine. PMup F/5607T/5512. Pump1OBBLH20,1513e1-159PPG SUMMARY Class G Cement, S BBL H2O, 23 SOL 8.8 NaCl BMs. Top Out 715512' T/4790'. Reverse circulate 2 tubing volumes. Circulete STS. WOC for compressive strength. RIH and tag at 5241', Rig up and pressure test cement plug. Notify AOGCC Petroleum Inspector Guy Cook of Intent t0 test plug with witness. ACTIVITY Tag plug and pressure fast. Laytlownddllppe. Pickupantlmnhanyerin hole. RILDS. Nipple down BOP, Nipple up Tree. FrocurpmtedwaL PLANNED FROM TO HRS OPERATIONS 600 900 3.0 WaBoncementers. Debylo cement ctewad! unfttmpped on anomeroperators bwgon tlueto warm weatM1erantl icercatl cbsvre. Continueprapamtbnkrcamenti.b. 9'.00 11:00 2.0 Rgupcement.m.Mk12.0PPGviscouspilL JSAforcementing. 11:00 1400 3.0 PumpSOBLH2O, Pressure tostlinesto2500PSI.P..18BBL12.OPPGVscouspillat5607'. Displace Viscous PiUMh3l.48BL0BPPGN.CIBMe. Layd.n3 to 5512'. Pump lUBBL Fresh H2D,15 DBL 15 8 PPG Class G Cement, 5 BBL Fresh H2O, antl d.pbce wtlh 23 BBL 8.8 PPG NaCl BMe. CIP 1348 Hrs. 1400 1500 1.0 Tocutfirst5standant30-50FPH, antl 11516 --w puNng Speed FI55lZTI479U. 15:00 10:00 3.0 Reverse ctmulat. 2tubing volumes at l BPM 100 PSI. Observed -1 BBLCement to surface and excess viscous pill strung ON for 20 more BBL. Drop wiper bell, Pump way for 1 NII cimuhnnon W 5 BPM. Mcnaorwe4 after circulating. static. 18'.00 290 0.0 Wa0 on cement Lay down 2-11e' BN pints and makeup H553 pump In equipment in preparation for testing plug. 330 6:00 4.0 RlHandtag TOCe15241'. Battlown 3k lc vetlty. GooU Rg up antl pressure test �meot plug to 1500 PSI Mr30mmutes. Goad, TOTAL HRS 24.0 MORNING UPDATE AOGCC Petroleum Inspector Guy Cook on his way to locafmn to wtness plug vent tion. MUDRECORD IMUD1 WaltmBasioll MUD Water -Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME18:00 ACTIVITY DAILY CUMHRB COMPANY NUMBER FLOWLINE TEMP (°F) 1 - RIG UPNOWN GREAT BEAR gg 2- DRILLING RICAN OILFIELD 14 MUDVVDEPTHIGH17VD MUD WEIGHTREMP (mlgep C.%JZ 0.5 3 -REAMING CRUZ 1 3 SOLIDS(%Vop 4 -CORING JFAIRVlEATHER 1 FUNNELVISCOSITY(s/gp S -CIRCULATE &CONDITION PTS 2 RHEOLOGYTEMP CF) 6 -TRIPPING R600111300 7 -SERVICE RIG R200M100 6 -DOWNTIME RNR3 9 -SLIP/CUT DRILLING LINE PV (up) 10- WIRELINE SURVEYS YP owl 00 R I 11 -LOGGING ONWATER (%Yap 12- RUN CASINGICEMENT tOSHO v30m GELS(W100fl 13 -WAIT ON CEMENT API FLUID LOSS (ccA0m1d) 14 - NIPPLE ON UPMOWN BOP'S HTHP FLUID LOGS (cd30min) 15 -TEST BOP'S CAKE APTMT (MZ) 16 -DRILL STEM TEST UNC RET SOLIDS (%Vop 1T- PLUG BACK CORRECTSOLI0518-SQUEEZE CEMENT OIL (%Vop 19- FISHING UNOORR WATER (%Vop 20- DIRECTIONAL WORK OILNVATER RATIO 21- MISCELLANEOUS ALKAL MUD (Pam) 22 -MEETINGS OL WHOLE MUD (mglL) 23 - WELL CONTROL SALT (%W) 24 -COMPLETION LIME(IblbNp 25- COMPLETION (STANDBY) TOTAL 24 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%VOp RIG FUEL 4,123 798 3,325 FCC(ppg) SUPPORTFUEL 17,286 400 6,086 FLOW IN (gpm) TOTAL FVEL 11,409 1,190 10.211 PUMP FREE (pap ROP (FPH) MST QNbbg HSE pH?EMP SAFETYMEETINGS BEAR SIGHTINGS: None POMf(0) 1) 2) OTHER WILDLIFE: None CHLORIDES(mgA.) - ACCIDENTS: I None ISPILLS, Nan. HARDNESS(Caaa) WEATHER DAILY HIGH 38°F OAILYLOW 31-F CASWG OO WT GRADE MO TV MAX WINB/DIR W30 MAXWINDCHILL 16°F Surd.. 10.75 45.5 3331 PRECIPITATION None VISIBILIr 10.00 m1 Intermsliat. 7.625 29 8595 COMMENTS None BHA DESCRIPTION LENGTH BHA. V✓T AIR BHA WT. MUD I HRS. ON JARS ROT Wi. P.0 WT S.O WT. TORQUE R BDATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP OP(ANNNEL) DC(ANN.NEL) WNER OUHER1 1 DULL 1LCC 6EgL GAUGE OMOR RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EPP% ECD AVOP AVOC BITHHP PUMPHHP 2 PRESSUREPARAMETERS POREPRESSURE: IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: C1 TRIP: FORM4TIOM II3 SHOWDEPTHS ROP BeIO nng ANr GAS MH)WC CHLORIDES REMARKS SURVEYDATA MO ANGLE AZIMUTH TVD N5 COORDINATES ENV V. SECTION DLG xwx ffez.nO Wdlalnfamal nMa�omeMLLC ver 051315N Nf Mt w PETROLEUM Alkaid Daily Completion Report WELL: Allen! : All American OlBield RIG: ftg 111 RPT DATE: 4112019 ACTNRY: ChocolateE: DRILLING SUPERVISOR I: Pat Stewart qiE Y: 2019822 API p: 50.323-20028-00.00: DRILLING SUPERVISOR 3: Lonnie Dmlanger bNEXTBOPTUT: LEASE: ADL 391704 : 35 TOOLPUSHER I: Joe Steiner FIELD: Wolin L: TOOLPUSHER R: RJ KmgIEd Castagne ELEV: RKB: 1].50 . 3282019 RIG PHONE Y: 907-802-4045 MD: 0,595 NG: 8,405 : 412/2019 LAST SHOE TEST GATE: SHOE TEST: 34HRFTG: HRSDRLG: AFP AMOUNT: AFE CUM. 24HOUR Wad on w crd weather and cementers. Shut dmn SUMMARY unnecessary mart Vaffic due to warm weather and concerns ab out Ice metl. ACTIVITY Pumpoement Wadoncement. Passurelestandtagcnneruplug. Laydmvn UP to kill string depth. Lantlhanger. Nlppledown BOPEand NippeuPTree. PLANNED FROM TO MOPERATIONS 800 fi:00 24.0 Welt ancemeMam, Delay to cement crew and ung tapped on another operators location due Id wool mother and ice mad closure. Continue preparation tar cement job. TOTAL HRS 24.0 MORNING UPDATE lWaff on cementers. MUD RECORD MUD Water-8asedl MUD Water-Based OPERATIONALTIME SUMMARY PERSONNEL ON SITE TIME 1600 gCTIVITY pgILV CUM HRS COMPANY TEMP(°F) 1-RIG UPNOWN GREATBEAR EPTHTVD(it) 2-DRILLING ALL AMERICAN OILFIELD MUD WEIGHT?EMP ghlgag 8.5 3-REAMING CRUZOLIDS (%VDg ENUBERLOWLINE 4. CORING ACS VISCOSITY(slpULATE B CONDITION PTS GY TEMPPING FAIRWEATHER R600 "1" 1. SERVICE RIG MEMO 6-DOWNTIME RfiIR3 9-SUP/CUT DRILLING LINE PV (cP) 10 - WIRELINE SURVEYS YP (Ih1100 rep 11 -LOGGING OIUWATER (%Voq 12- RUN CASINGICEMENT 10"10nY30m LS GEQdIDOdV 13 - WAITON CEMENT API FLUID LOSS (ccl30min) 14 - NIPPLE ON UPIDOM BOP'S HTHP FLUID LOSS (cr43(mfit) 15 -TEST BOP S CAKE APTAIT (1YJ2') 1 18 -DRILL STEM TEST UNC RETSOLIDS ((pp 1)-PLUG BACK CORRECT SOLIDS(%V0g 18-SQUEEZE CEMENT OIL (%Vo0 19. FISHING UNOORR WATER (%Voo 20- DIRECTIONAL WORK OILIWATER RATIO 21 - MISCELLANEOUS ALKAL MUD (Porn) 22 - MEETINGS CL WHOLE MUD (mglL) 23 - WELL CONTROL SALT (ep 24-COMPLETION LIME ObIbb0 25- COMPLETION (STANDBY) 1 11 TOTAL 27 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYSINV. SAND(%VOIJ RIG FUEL 4,IBa 6fi5 4,123 ECD (Pro) SUPPORT FUEL ),fi88 q00 7,286 FLOW IN (gpm) TOTAL FUEL 12.474 1,085 11p09 PUMP PRES (ps9 ROP (FPH) MET(IMEhg HBE pHTEMP SAFETYMEETINGS BEARSIGHTINGS: None POMI(0)1) 2) OTHERWILDLIFE: None CHLORIDES(mgi/-) ACCIDENTS: None ISPILLS: None HARDNESS (Cal-) WEATHER 1 DAILVHIGH 36-F DAILY LOW 31'F CASING OD WT GRADE MG NO MA(VANDIDIR IN MA%WINDCHILL 16-F Surface 10.)5 45.5 3331 PRECIPITATION None VISIBILTY locand IMemlediMe ].625 29 8595 COMMENTS I None BHA DESCRIPTION LENGTH BHA. WTgIR BHA W�. MUD HRS.ON JARS ROT Al. P.0 Wi S.O WT. TORQUE BIT DATA NO I SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP DPIANNNEL) DC(ANN.NEq BIT NO.INNER W1ER WLL LOC REAL GAUGE OTHER RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF % ECD AVDP AVDC BITHHP PUMP HHF 1 2 PRESSURE PARAMETERS PC EPRESSURE: REDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAB SNOWS CONN: CIL #1 TRIP: FORMATION: #2 SHOWDEPTHS ROP BeOrW0urgA r GAS MUD NT, CHLORIDES REMARKS SURVEVDATA NO ANGLE AZIMUTH TVD N5 COORDINATES ENJ V. SECTION DLS v.8118Z.ON WdlalnIP'mn nWnepemen[LLC ver_051315V W PETROLEUM Alkaid Daily Completion Report WELL: AMei1#1 CONTRALTOR:AII Amencan Dimpled RIG: Rg 111 RPT DATE: 3WQ019 ALTrvITY: Compl.td SPUD DATE: DRILLING SUPERVISOR .I Pat Slowed AFE#:2019A22 API#:50-2232002&00-00 DFS: DRILLING SUPERVISOR 2: Lemma D.IRnger LEASE: AOL 391]04 REPORT NO: 34 TOOLPUSHER I: 1 Jae Steiner FMILD:j WIBMt I DOL-1 RJ Krug MET/ RILE: 17.50 LAST BOP TEST: 3126@019 RIG PHONE b: 907-802-4045 MD: 0,596 ND: 9,435 NE%T B.PTE.T: 4YL2019 LAST SHOE TEST DATE: SHOE TEl 24 HR FTG: HRSDRLG:CSGHD: AFEAMOUNT: AFE CUM. 24HOUR Pam Tender to dg moor and ley down. Tap in Them haleto 630]. Rg up to cement Wad an cementers. Demob. PTB equipment. SUMMARY ACTIVITY Pomp MmenL Wait on cement. Pressure test and Tag cement In, Lay down DP to kill string depth. Land hanger. Nipple down DOPE and Nipple up Tree. P ANNED FROMI TO I HRS I OPERATIONS N0 8:00 2.D Rg down ci Mein, Inoses. BOLDS, pull hanger to rg floor. Lay down M1angar. 0 990 19 Pkmup OP an. an on the role T/53(11'. 9:00 6:00 21A RgUpto MmenL Wait on Mmeni crew. DeLyd,,,md Fit crew and and trapped on another operell locaCnn due to warm weatnerantl ke wed closure. Clean rig. PTS equipment Begn pulling containments a"an; emabe. Shutdow Mssary road--- due io warm wealbe... d concema about ice mad. TOTAL HRS 24.0 MORNING UPDATE Wait on cementem. MUDRELORO IMUDI Water,Bpampal MUD 2 Water-Bmsed OPERATIONAL TIME SUMMARY I PERSONNEL ON SITE TIME 18:00 ACTIVITY DAILY CUM NRS COMPANY NUMBER FLOWLINE TEMP PF) 1 - RIG UPrDOWN GREAT BEAR 4 DEPTH? DRI 2-DRILLINGI JALl_ AMERICAN OILFIELD 14 MUD WEIGHT/IEMP(Ibdgal, 3.5 3-REAMING I JCRUZ 3 SOLIDS (%Vol) 4 - CORING ACS FUNNEL VISCOSITY (e/qt) 5-CIRCULATE &CONOIDON PTS 4 RHEOLOGY TEMP ('F) 6-TRIPPING FAIRWEATHER 1 RBOOM300 T -SERVICE RIG R2001R100 8-DOWNTIME R8/R3 9 -SLIP/CUT DRILLING LINE PV (oP) 10 - WIRELINE SURVEYS YP owl do IT 11-LOGGING OIUWATER pil 12-RUN CABING/CEMENT 105110m130m GELS (IW100ft�1 13 - WgIT ON CEMENT API FLUID LOSS (cobOmin) 14 - NIPPLE ON UPIDOM BOP'S HTHP FLUID LOSS (ccYJOmm) 15-TEST BOP'B CAKE APTIHT (1/32'J 13 -DRILL STEM TEST UNC RETSOLIDS (%Von 1] - PW G BACK OCRRECTSOLIDS(%Vol) 18-SQUEEZE CEMENT OIL (94V00 1119-FISHING )NCORR WATER (%V.n 2D -DIRECTIONAL WORK )II-MATER RATIO 21 -MISCELLANEOUS AL3(AL MUD (Form) 22-MEETINGS CL WHOLE MUD (mgh) 23-WELL CONTROL SALT(%.) 24-COMPLETION LIME (Ibli 1 25-COMPLETION(STANDBY) TOTAL 27 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%Van RIG FUEL 5586 798 4,788 ECD(on) I SUPPORTFUEL BD3B 1 350 1 7,698 FLOW IN (gm) TOTAL FUEL 13,edd 1,148 12,474 PUMP PRES (pen ROP (FPH) MBT(INbbn HSE OHNEMP SAFENMEENGS BEARSIGKIINGS: None POMC N) 1) 2) OTHERWILDLIFE: None CHLORIDES(mgh) ACCIDENTS: None SPILLS: None HARDNESS(Ca++) I VEATHER I DAILYHIGH I 35°F I DAILYLOW 3-F CASING OD WT GRADE MD ND MAXWINDIDIR W]0 MAXWINDCHILL I 16-F sm.r. 10.75 45.5 3331 PRECIPITATION None VISIBILTY 10.00., Indra ate 7.625 29 8595 COMMENTS None BHA DESCRIPTION ' LENGTH BHq.`MgIR BHA WT. MUD HRS. ON JARS ROT.1, PL WT 150 WT. TORGUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANN.MEL) DC(ANNNEL) BITNO. INNER I uru. OLUL I LOC SEAL. I GAUGE I OTIER I IRFJ HYDRAULICS DATA P2MAKE MODEL LINER STK SPM PSI GPM CPS EFF% ECD AVDP AVD BITHHP PUMP HHP 1MP 2 PRESSURE PARAMETERS PORE PRESSURE: IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH OHS SHOWS CONN: CL: X1 TRIP: FORMATION: k2 SHOWDEPTHS ROP Be mCI.ny Aller CAS MUD NR. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH WO N5 COORDINATES EW V. SECTION DLS w.w.xNl¢.nN Wdla lnfmm Han Management LLC v 051315M �Af Gl�EN�CUIIM Alkaid Daily Completion Report WELL: Alfred #1 CONTRACTOR: AB American O00e. RIG Rig 111 RPTDATE: =013018 gCTNITY: Complete DRILLING SUPERVISOR I: Pat Stewart AFE #: 3019A22 API #: 50-22320029-0000 DRILLING SUPERVISOR 3: LonnaDrvl4nerLEASE: ADL 311]04 33 TOOLPUSHERI: Joe Steiner FIELD:W.cer JSPUDDATE: T00LPUSHER 2: RJ Krug ELEV: RKB: 1).50 3126MO19 RIG PHONE#: 907-602-4005 MD: 0,595 ND: 6,485 //22019 LAST SHOAc. DATE: SHOETEST: 24 HR FTG: HRS DRLG: LAFE AMOUNT: pFE CUM. 24H0UR Clear tubing from b.ckege, bullM1eadmg NZ down I bring.Flout-twell.Re, -H tl0wn ngrogen On lAand Witting. a1 well. RD up wireline and put Temperature and Pressure gauges from SUMMARY tubmg' ACTIVITY Unseat and lay down hanger. RIHW 5600'and M upto cement Pumprementplug. PLANNED FROM TO HRS OPERATIONS 6:00 800 2.0 BUIIM1ead down Wining wAM1 N2, vetlry tubing's clear. 8:00 10:00 20 Lane up N2 tlown IA, taking returns to PTS. 10:00 17:00 70 Flowbackwell, pump Nil lAuntil0bservetl break over on Pressure,intl.atin8 N2 around comer. Begin OBing fled. TOWTO1419 BBLproducedfromweit 1700 21:00 40 B.etl down lq and tubing M10m N210 PTS, dear.p foes of all Fluitl. 21:00 130 45 RM up to kill wet. Pump tlown B.O PPG NeCIKWB. Tcpk 35 Bel to get returns. WeA an slMbt losses. 130600 4.5 Rg up Woolard. KIH and pull gauges out 0fthe R-Nipple. RN wireline. M 24.0 DATE BOLDS, put hengerto rip floor. Fill IA, bong on more flu.. MUD RECORD MUD 1 Water-Basetl MUD 2 Water-Basetl OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 10:00 ACTIVITY DAILY CUMHRS COMPANY NUMBER FLOWLaNE TEMP(°F) i -RIG UPAOWN GREAT BEAR q DEPTHITVD(g) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHT)TEMP pb/gal) BS 3-REAMING CRUZ 3 SOLIDS (%Vpi) 4 - CORING ACS 1 FUNNEL VISCOSITY(shit) 5- CIRCULATE a CONDITION PTS e RHEOLOGY TEMP (°F) 1 6 -TRIPPING RBOOR300 T- SERVICE RIG R200IR100 8-D TIME R6/R3 9 - SLIP/CUT DRILLING LINE PV (cPJ 10- WIRELINE SURVEYS YP ON1D0 11-LOGGING ONWATER (%Vop 12- RUN CASINWCEMENT W30m GELS (IN1008 13- WAIT ON CEMENT U ID LOSS(c Omin) 16- NIPPLE ON UPIDOWN BOP'S FLUID LOSS (OWOr in) 15 -TEST BOPS PTMT (1132') 16 -DRILL STEM TEST ET SOLIDS (%VOD P -PLUG BACK CT SOLIDS(%Vop !01�AMR 10-SOUEEZECEMENT VopiB-FISHINGR WATER (%Vop 30 - DIRECTIONAL WORK TER RATIO 21-MISCELLANEOUS MUD (Prom)22-MEETINGS OLE MUD (m,Q 23 - WE%W) 24-COMPLETION LIME 111 25- COMPLETION (STANDBY) TOTAL 30 EMULSTABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%Vop RIG FUEL 2,680 3,8)5 949 1 5,586 ECD (pp9) SUPPORTFUEL 7,592 1,2011 756 1 8,036 FLOW IN (Ppm) TOTALFUEL 10,252 5.0751 1,705 13,823 PUMP PRIES (psi) RCP(FPH) MBT(INbbp HSE pHITEMP SAFETY MEETINGS BEAR SIGHTINGS: None PuMf(0) 1J 2) OTHERWLOLIFE: None CHLORIDES (mg/L) gLLIOEMS: Nana SPILLS: None HARDNESS(C... ) WEATHER DAILY HIGH 2e°F DAILYLOW 1 21°F LASING 0D W,5 GRADE NO MAXWINOADI So22 MABWINDCHILL Surface 33 455 3331 PRECIPITATION None VISIBILTY 1000 mi PITATIO 00 7.675 Intermediate 7.625 29 8595 COMMENTS None BHA DESCRIPTION LENGTH BHA. WrTAIR BHA Wrr. MUD NRS, ON JARS RDT WT. P.0 VJT S.O WT. TORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANNNEL) OC(gNN.NEq BITNO. INNER OUTER DULL LOC I I8E4I IGAUGEI I 01HER I IRPI HYDRAULICS DATA PUMP MAKE MODEL LINER SM SPM PSI GPM GPS EFF% ECD AVDP AVDC BITHHP PUMPHHP i Z PRESSURE PARAMETERS POREPRESSURE.1 IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: #1 TRIP: FORMATION: #2 SHOWDEPTHS ROP BWremenng Mer GAS MUD WT. CHLORIDES REMARKS SURVEYDATA NO ANGLE 1 AZIMUTH TVD NIS COORDINATES ENJ V. SECTION DLS w.w.v2Y—t WJIFilnNmAon Manap mmtLLC ver 051315M N(CIl` VM Alkaid Daily Completion Report ETRO LEUM WELL:I Akaid 11 1 CONTRACTOR: Al American ORletl III RIG: Rg 111 RPT DATE: 3rz9/2018 Lag/2019 ACTNITY: Compkte SPUD DATE: DRILLING SUPERVISOR I: Pal Btewad APE 1: All1:5622]-2002400-00 DFS: DRILLING SUPERVISOR 2 Lonnie Drainer LEASE: AOL 391704 REPORTNO: 32 TOOLPUSHERI: Joe Steller FIELD: Widest DOL: TOOLPUSHER 2: RJ Kmg ELEV:IRKS: 1 17.50 LAST BOP TEST: 3262019 RIG PHONE I: 907-802-4045 MD: 8,595 WD: 8,485 NEXT BOP TEST: 4YL2019 LAST SHOE TEST DATE: SHOETEST: 24 HR FTG: Hi DRLG: CSGHD: qFE AMOUNT: AFECUM. 24HOUR Repair Omwwors. Trip in to SiUd Pickup hanger assemby, lend, and RILDS. Pressure test hanger to 3800 PSL good. Rlg up PTS and N2. Pressure test lines to 2500 PSI, Good, SUMMARY FbwtAJAlkaidwell. Flowstopped. ACTIVITY AKempltocleetubingfmmblockatte. PLANNED Bringwell.randflowtest. FROMI TO I HRS I OPERATIONS 600 j 10:00 1 4.0 Rig Repek- Troubleshoot and repakdrawworks drum clutch 10:00 11:00 1.0 Trip N the Is. FI21MV T/5216'. 11:00 12:30 1.5 Pick Up hanger assembly. Redress hangerseas. Drain Steck. 1230 1 13:30 1 1.0 Rig Repair- Repair UrawwOMs tlmm Wtch 1330 1 1430 1 1.0 ILand hanger on depth. RILDS. Cbae IA VaNe. 14.30 1 15:30 1 1.0 1 Pressure test hanger seas from above to 3000 PBL Test good. 15:30 20:00 45 R/UXO, TIW and Headpm. RAI PTS hartlline from T-manlotl on top oftubing. RN Tubing and W equalizing One. 20:00 21:00 10 Pressure test N2 Wes and flowbatk lines T25OO PSI. 21:00 4:00 1 7.0 Pump down lA With N2, Flow test well to PTS. 4'.00 6:00 1 2.0 Well how slowed and stopped Saw down PTS heNIII Shut in was end monitor pressures. TOTAL HRS 24.0 MORNING UPDATE ILineup W bulbead down the Wbing with Ni MUD RECORD MUD 1 WaterBasedl MUD 2 Water-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1800 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOWLINE TEMP(°F) 1-RIGUP/DOWN GRE4TBEAR 4 DEPTH/ND Ug 2-DRILLING ALL AMERICAN OILFIELD 14 MVO WEIGHT?EMP(Iblgafl 80 3-REAMING CRUZ 3 SOLIDS (%Vp) 4 -CORING ACs 1 FUNNELVISCOSITY(Lgp 5- CIRCULATE d CONDITION HER ] RHEDLOGYTEMP(°FL 5-TRIPPING FAIRWEATHER 1 360ORi300 )- SERVICE RIG PTS 0 R200rtt100 8-DOWNTIME Re/R3 9-SLIP/OUT ORILLINGLINE PV (UP) t0- WIRELINE SURVEYS YP Owl SO to 11-LOGGING OIIIWATER (%Voq 12-RUN CASINGICEMENT 10910mdcm GELS HADD 13 - WAIT ON CEMENT API FLUID LOSS (cc50min) 1 1 14 - NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOSS NWOrrin) I15-TEST BOP 5 CAKE APTIHT (1/32°1 18 - DRILL STEM TEST UNC RET SOLIDS (RVo) 1] -PWG BACK CORRECT BOL103 (%Vog 18-BCUEEZE CEMENT OIL (%VO) 19- FISHING UNCORR WATER(%Vop 4D-DIRECTIONAL WORK OI.ATER RATIO 21- MISCELLANEOUS ALKAL MUD (Pam) 22 - MEETINGS CL WHOLE MUD(mgi 23-WELLCONTROL .ALT(%Vd) 24-COMPLETION LIME(Ib/bb0 25- COMPLETION (STAND" TOTAL 34 EMULSTABJUW CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%Vo) I RIG FUEL 3,458 ]88 2,880 ECD(ppg) SUPPORTFUEL 9,8)2 1,040 8,632 FLOW IN (gpm7 TOTAL FUEL 13.130 1,838 11,292 PUMP PRES (p5) ROP (FPH) MBT 0h/bbil NBE PH(TEMP SAFETYMEETINGS BEARSIGHTINGS: None Pw (Ol 1 2) 1OTHERVALDLIFE None CHLORIDES URi ACCIDENTS: None SPILLS: None HARDNESS (Casal WEATHER DAILY HIGH 30°F OAILYLOW 21 °F CASING 00 WT GRADE MD ND MAX WINWDIR SW WINO CHILL 6°F Senate 10,75 Z. MAX 45.5 3331 PRECIPITATION None VISIBILTY 10.00 m1 Intemediate 7.625 29 8595 COMMENTS None BHA DESCRIPTION LEN.i. BHA. WTgIR BHA WT. MI HRS.ON JARS ROT WT. P.0 Wf S.O WT. TORQUE BR DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WIGS RPM ROPOP(ANNNEL) DCIANNJVEL) lani I INNER I I OULLIJ I DULL I I LOC I GAUGE I RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AVDC BITHHP PUMPHHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: REDUCED PUMP RATES ISG: MAX: REMARKS: PDMP BPM I I PRESS I DEPTH Gas SHOWS CONN: CV #1 TRIP: FORMATION I #2 SHOWDEPTHS ROPBd.,mUu,n AM, GAS MUDWT. CHLORIDES REMARKS SURVEYOATA MD ANGLE AZIMUTH WD N/S COORDINATES EAv V. SECTION DLS —I—net We11Fi Inormabon Manepemen LLC ver051315M WWr Alkaid Daily Completion Report'ETRO LEUM WEI-1-:1 Alkak Yl CONTRACTOR: A6 American Call RIG: Rig 111 RPT DATE:1 3QM019 ACTIVRY: CompleteWDRILLING SUPERVISOR V Pat Stewart AFE C: 2019A22 All p: 50-223-2002900-00 DRILLING SUPERVISOR 2: Lonnie Oroll'ulger LEASE: AOL 391704 31 TOOLPUSHERI: Kevin McDowell Steiner FIELD: Witicet TOOLPUSHER2: RJ Krog ELE)f IRKS, 17.50 3na12019 RIG PHONE 0: 901-8024045 MD: 8,595 ND: 0,4as 41V2019 LASTSHOE TESTDATE24 HR FTG: HRS DRLG. AFE AMOUNT: qFE CUM. 24HOUR Tested Bmoklen ZOl Cement Plug W 2000 PBI for 30 Minutes. Goad Test. AOGCC Plug Pressure testwftnessed by Paboleum lnepeMrAdam Earl. Lay down 90 pit UP. Trip oN blind SUMMARY bole. Rig upwireMe 3-3/0' Perforating guns. Perorate West Sakeem, PosgFvelndicance Ofguns8dng. Rgtlown E -lino. To in Ne hole WBM1 production assembly. ACTIVITY Trpin Ne M1olewillllawte5ling assembNRg up PTS and N2. Fbwlest Wesl Sak zone. PLANNED FROM TO HRS OPERATIONS 6:00 8:00 3.0 Test ELM plug 72200 PSL 50 PSI install ost fssHS minutes. ]S PSI lost over30 mnWes. 26 BBL pumped by strokes, 20 BBL bled back. 8:00 900 1.0 RgtlownfromtesL prepare dg T.mrta laydowo ddllpipd. 9:00 12:00 3D Contad AOGDG Petroleum Inspector Adam Earl Plan to be on location at 1000 him. Rig upto permmw8nessed test. Perorm cement Plug pressuretest T2200 PSI 30 Bunt ea. 10 PSI lost frs115 minutes. 20 PSI lost over30 minutes. 26 BBI -Pumped bystrokes, 1.5 BBL Bum back. Test good. Test w0nessed by AOGCC Petroleum Inspector Adam Ear, 1200 13:00 1D RQ down Prem cement pug test. Blow down all equgment. Rig uP to ley down tlrll pipe. 1300 17:00 4.0 Lay down drill pipe F15000' TI2030'. 1700 21:30 4.5 TOP Out of Oe hole F2030' TSURace. 21:30 2:00 4.5 Rig up E -Fns. RlH and cortelate. Fie 3-3/8"HMX 85PF-6o PM1ese-120 GM1ats Totel-20'Buns, Tep Shot 5378'. Botlam Shot 5398. Passive indication at sunice of thing. No pressure afterou ng. 2:00 3:30 1.5 RgupancatlempttuewaDtincimuletioninmugnpemmtion¢toNeOA.Pressure upto300 PSI. bled down W200 P61aRar 15 minutes. Nahidicffonof Mums OA. Rig down circulating lines. 330 600 2.5 Makeup 24/8"MulesM1oe,l sfantl ofDP, XNpple wBh lemperaWm sort pressure gauge5,and WIN F/Surface T2904'. Notes: AOGCC Ping Pressure test witnessed by Petroleum InspectorAdem Ear. TOTALHRS 24.0 MORNING UPDATE Rg maintenance, Drawwmks clutcM1 MI damaged repalrclotch airline. MUO RECORD MUDIW.fa,B.sSd MUD2W.dPBased OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1600 ACTIVITY DAILY GUNFIRE COMPANY NUMBER FLOWLINE TEMP VF) 1 -RIG UPIDOWN I GREAT BEAR 1 4 DEPT/TVD M) I 2 -DRILLING ALLAMERCAN OILFIELD 14 MUD WEIGHTIIEMP("all 9.0 3 -REAMING I ICRUZ 3 SOLIDS MVolg 4 - CORING All FUNNEL VIBCO6ITY (spp 5 -CIRCULATE 6 CONDITION HES RHEOLOGY TEMP(°F) e -TRIPPING FAIRWEATHER 1 600M300 7-SERVICERIG PTS 0 ft200MI00 0 -DOWNTIME AOGCC 1 RMy 9 - SLIPICUT DRILLING LINE PV (cP) 10- WIRELINE SURVEYS YP owl 00 rV 11 -LOGGING OIUWATER(%Voq 12- RUN CASINGICEMENT 105/1 MITI GELS 91,11001Pr 13 - WAIT GN CEMENT API FLUID LOSS (cc130min) 14 -NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOSS (ccb30mp) 15 -TEST BOP'S CAKE APTW (122] 16- DRILLS E TEST UNC RETSOUDS(%VOq 17 -PLUG BACK CORRECT SOLIDS(%Voq 18 -SQUEEZE CEMENT OIL (%VOq 19 - FISHING UNCORR WATER (%Voq 20 -DIRECTIONAL WORK OILANATER RATIO 21- MISCELLANEOUS AU AL MUD (Porn) 22 - MEETINGS CL "OLE MUD (mgf,) 23 - WELL CONTROL SALT (%4N) 24-OOMPLETON LIME (lo/bbd 25- COMPLETION (STAND" TOTAL 35 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAY S INV. SAND (%V.0 RIG FUEL4,123 885 3,458 ECD (ppg) SUPPORT FUEL 10,100 508 9,672 FLOW IN (gpon TOTAL FUEL 14,303 1.173 13,130 PUMP PRIES (pit) ROP (FPH) MBT Uh/bbq HSE P(0) SAFETY MEETINGS BEAR SIGHTINGS : None Pow (0) D 3) OTHER WILDLIFE' None CH CHLORIDES (mgr.) ACCIDENTS: None SPILLS: None HARDNESS (Co..) WEATHER GAILY HIGH 33°F DAILY LOW 10°F CASING OD W.5 GRADE ND MAK SW 20 MAK WIND CHILL 3°F Surace 10J5 33 45.5 3331 PRECIPITATION I None IPI ATIO VISIBILIV 10.00 m1 Intermediate 7.825 29 8595 COMMENTS 1 None BHA DESCRIPTION LENGTH BHA. WT AIR BHA WT. MUD HRS.ON JARB ROT W?. B.O WT. TORQUE TO . BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WO6 RPM ROP aP(gNNNEL) OC(ANNNEy BIT NO, I INNER OUTER DULL I I LOC SBJ. GAUGE OTHER IRPI HYDRAULICS DATA PU1MP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP IAV OCI BIT HHP PUMP HHP 2 PRESSURE PARAMETERS I Po EPRESSURE:jj REDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH OAS SHOWS CONN: CL: #1 TRIP: FORMATION: #2 SHOWDEPTHS ROP BeIoreNunna Anel GAS MUD W. CHLORIDES REMARKS SURVEY DATA MD ANGLE A IMUTH TVD N5 COORDINATES EAN V. SECTION DLG e—ex e,, net WeIlla lunation M—Donnenl LLC vrt 05131510 ESA( l� VE►UAIM Alkaid Daily Completion Report WELL:j AIkad#1 CONTRACTOR: A9Amerfan0iYietl RIG: Rig 111 RPTOATE: 3/212019 TEN DRILLING SUPERVISOR I: Fat Stwad gCTNITY: CompleteWNrEEXTBOP ARE N. 2019A22 API#:50-M-20029-00.00F3: DRILLING SUPERVISOR 2: Lonnie DmlGnger LEASE: ADL 391704 O: 30 T004PUSHERI: Kevin MODOWBY FIELD: wid al OL: TOOUPUSHER 2: RJ Wag ELEV: RKB: 1].50 ST: M132019 RIG PHONE V. 907.802-4045 MD: 8,595 N0: 0,465 ST: 422010 LAST SHOE TEST DATE: SHOE TEST:24HRFTG: HRS 00.LG: ME AMOUNT: AFECUM. 24HOUR Punish replacing bWd ram seat. Test blind mina 17250 PSI lown000 PSI hgM1. Test chokes on choke manPob. AOGOO BOPS test wAness waivetl by Petroleum Inspector Bob Noble. SUMMARY pump 17 BBL 15.8 PPG cement, ] BBL enced below packer at 010]' - tO BBL e,.Uad on tap. Circutte Ends and weight system to a PPG iWout. Pressure test cement plug. AOGCC Plug Pressure test w0nessed by Penatum InspectorAdam Earl. Test failed. Verby cement plug with tag at ]033' and 5k set tlown. Tap Out F0833' TI5000'. RIU to test Cmt Plug. ACTIVITY Testcementplug. Laydmn9gps2-718'OP. Rack back remainder ofdMpipe. Run witches perforating guns antlpwf West Sak Mterval. Attempt e establish circulation to OA. PUNNED FROM TO HRS OPERATIONS 8:00 0:00 2.0 Continue replacing Blind Ram seat. Test blintl rem5tO 250 PSI Iawl3000 PSI bgM1. Test ManualCM1oke antl Hytlraukc Woke valves an choke manifod. 800 1100 2A RIG down test equipment Pull BPV antl Blanking Plug BOLDS. Lay tlown longer assemby. -pups 1100 13:30 2.5 Lee down spew out horn tesfmg, pickupsingle, set PLSpackerstel W'. 13:30 15:00 2.5 RQ up to cement. PJSM. Cement batAretl at 14: 36 hrs. Pump 2D BBL H2O I BPM860 PSI. Pump 17 BBL 15.8 PPG Class G cement 2 SPIV 10 PSLFret S BBL _5 15 # of Wal Life LCM pumped last 12 BBL. Pump BBL H20 2BPM151 PSI, Pump 325 BBL 8.85 PPG NaCl Blind 2 BPMI540 PSI FOP. J -off Packer. Pick up, Observe tuhhg On vac, well on U-tube with rMurns at imply table. CIP 15 0] he 500 BC at ]:20 M1rs after OIP.23 0] M1rs. 16:011 16:30 0.5 Trp out first 3 stands at 40 FPM to get allow, cement. Continue tripping Out at nomial rate for 5 more stands TR579'. 16:30 18 DO 15 Rg up and reverse urcalais at l BPMI100 PSI, minimbing EGDs on cement pug, reverse 2 tubing volumes. Observe l BBL of cement to surface on label BUS. 1800 0:00 6.0 Pumpbidd.wnbrgwaytowipepips. 2BPM200PSI. Continue umulefmg and brag brae weight from8.85 PPG 1a 0.0 PPG inlauE 0:00 1:30 TS WUtotestcementplug.AOGOCPetmleuminspectargtlam Eedwitnessetllest.P-Teslto 2000 PSI found minutes. 240 PSI pressure necked nanstabk.d Test 130 2:90 10 RIH FI]5]9'TO033'. Ta9tOPpfaement. Seidown5ktOvenfy. 230 400 1.5 [Sland back one etantl Tl]]]]', pump tlown tubing to veryclear. Gootl. 4:00 530 15 Tap Out ofthehon Fl]]T/'T/600Iw 5:30 B 00 0.5 lig Up 1a Perform Ping Pressure Test. Nates: AOGCC DOPE test winess waivetl by PeWleum Inspector Bob Nabk:. AOGCC Plug Pressure test w0nessed by Petrvleum Inspector Atlam Eatl. TOTAL HRS 23.0 MORNING UPDATE 1P,assure test cement plug. Good 50 PSI bstover30minutes, Contact AOGCC Petroleum Inspector Adam Eatl for re -test. MUDRECORD MUD 1 Witer-Basim MUD Water-Basetl OPERATIONAL TIME SUMMARY PERSONNEL ONSITE TIME 18:00 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOWLING TEMP ('F) 1 -RIG UPAOWNGREAT BEAR 4 OEPTH/NO(f0 2 -DRILLING ALLAMERICANOILFIELD 14 MUD WEIGHTrtEMP(Ibas) 9.0 3 -REAMING CRUZ 3 SOLIDS (%Vag 4 -CORING ACS 1 FUNNEL VISCOSITY (set) 5- CIRCUUTE& CONDITION HES RHEOLOGY TEMP (°F) e - TRIPPING FAIRWUTHER 1 R600/R300 ]. SERVICE RIG PTS 6 R200rt3100 a DOWNTIME JAI 1 RO/R3 9-SLIP/CUT GRILLING LINE PV (UP) 10 -WIRELINE SURVEYS VP(IN100SI 11 -LOGGING ORLINATER (%Vpg 12 -RUN CASINGICEMENT I Os/l oml3Om GELS ONI0afi 1 13 - WAR ON CEMENT AN FLUID LOSS (cc/30mn) 14 - NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOSS (Lon.) n) 15 -TEST BOP'S CAKE APT/HT (=') 16 -DRILL STEM TEST UNC RET SOLIDS (%Vog 17. PLUG BACK CORRECTSOEIDS (%trop 18 -SQUEEZE CEMENT OIL (%Vol) 19 - FISHING UNOORR WATER (%VOg 20 -DIRECTIONAL WORK OItJVJATER RATIO 21- MISCELUNEOUS ALKAL MUD (Poo) 22 - MEETINGS GL WHOLE MUD (mgM1) 23 - WELL CONTROL SALT(%1M) 24 -COMPLETION LIME gblbbg 25- COMPLE➢ON(STANDBY) TOTAL 35 EMULSTABILITY CONSUMABLES START RECEIVED USED TODAYSINV. SAND(%VOD RIG FUEL 4,700 865 4,123 ECO(ppg) SUPPORTFUEL fa,963 783 1 101180 FLOW IN (gpm) TOTAL FUEL 15,]511 p46 14,303 PUMP FRES (pep ROP (FPH) MBT(INbbg HIE IRI SAFETYMEETINGS BEAR SIGHTINGS: None PfO1f(a) 1)OTHERWILDUFE: one 2) CHLORIDES (MIL) ACCIDENTS: None SPILLS: Non: HARDNESS(Ca++) WEATHER DAILVHIGH I 33°F I DAILYLOW I 10°F CASWG OD WT GRADE MD TV MA%WIND/DIR SW 20 MA%W4N0 CHILL -5°F SURaw 10.75 45.5 3331 PRECIPITATION Now lVrblUILIY 10.00 mi Intermetliate 7625 29 8505 COMMENTS None BHA DESCRIPTION LENGTH BHA. WTAIR BFW 4N. MU0 HRS.ON JARS ROTWT. PU Wu S.O N?. TORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP OP(ANNNEL) OC(ANNNEq BITNO.I INNER I I UmRj DULL LOG I I SEAL I IGAUGE I RP HYI2RAUL10S DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AV DC DITHHP PUMPHHP 1 2 PRESSURE PARAMETERS PORMPRESSUREREDUCED PUMP RATES BG: MAK'. PUMP SPM PRESS DEPTH GNS SXOWS CONN: CL:#1 TRIP: FORMATION:#3 SHOW DEPTHS ROPSHmuDm,n AllenMUD WC CHLORIDES REMARKS SURVEYOATA MD ANGLE AZIMUTH TVD N5 COORDINATES Em V. SECTION DLS uww. WePaz el WdlU InMrmOon Mai Vmml LLC am 051315M W6mr Alkaid Daily Completion Report PETROLEUM WELL:l Alkail Yl CONTRACTOR: AIIAmedean 011M RIG: R0111 RPTDATE: 326/2919 ACTIVITY: Compkle SPUD DATE: DRILLING SUPERVISOR I: Pat StmD.rl AFEp: 2019A22 1 APIk:50-223-20029-00-00 DFS: DRILLING SUPERVISOR 2: Lonnre Drollager LEASE: ADL 391704 REPORTNO: 29 TOOLPUSHERI: Kevin MCDowel FIELD: WMcat DOL-1 TOOLPUSNER 2: RJ Kmg ELEV: RK9: 1].511 LAST BOP TEST: 3/11rz019 0.1G PHONE M: 907-802-4045 MD: 8,595 ND: 6,405 NEXT SOP TEST: 3/2512019 LASTSHOE TEST DATE: SHOETEST: 24 HR FTG: HRS DRLG: CSGHD: AFEAMOUNT: AFEOUM. 24HOUR FB 1AwNnarwater, monitor me; Ate. Initial loss rate 70 BPH, at 160 BBL m enewatertlown W,loss mk retlucetl totOBPH. RguptC test 90PE equgment. Test BORE to 250 PSI SUMMARY Nw/3090PSIMgh. Test upper rams and annular preventer with 2-7M" Test joint. Petfomlaccumuletartlrzwtlown test Test H25and LELelemis. Lass 2roont. cestB BPM 2500 doing test. AOGCC BORE test witness waivetl by Petroleum Inspector Bob Neble. ACTNIN Finish BORE test. Pump cement plug. Pressure bot cement plug. Trip out ofthehpM,laytlown drNl pipe. Rg up wireline and ran perforating guns. PLANNED FROM TO OPERATIONS 6:00 9:00 bwdown al surface equipment. Take on 80 BBL03FresM1 Wafer to pits, 250 BBL 9.ONaCIBdnetp pits. Rg up tc pumptlown M. 9:00 15:00 IA w6M1 fresM1wafer, observe 70 BPH initial lossrate, loss rate reducetl to 12 BPH after160 BBL freshwaterfill. 15:00 16:00 fi5aFM ake up floor valves In preparation for BORE test. Rg up Win tank to lA br tling annubs. 16:00 10A0 ig up to lest BORE. Land hanger. RILDS. SH BPV. Set blankmg plug. Rig up test joint. 18:00 600 st BORE to 256 PSI low/30001 PSIhgh. Test Upper remsandanularpreventerwAb2]I8"Testjoint. Perform accumutafor dreadownrouble w6M1 lest pump, reDun Tmu inwD Dina namtest change out ram robbersCongnus to monitor well during test CongnuetitmonitorWontrptank. Lossmteduced to 1 BPM tlurinp test. Nates: AOGCC BORE test witness waived by Pencleom Inspector Bob Noble. TOTAL HRS 24.0 MORNING UPDATE ITake on 225 BBL of She, losses at calculated 60 BPH. MUD RECORD MUD Water-BasedMUD WatervBased OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1800 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOVA-INE TEMP ('F) I-RIGUPMOWN GREAT BEAR 4 DEPTH/ND(B) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGNTIIEMP Ob/galj 90 3-REAMING CRUZ 3 SOLIDS (%VOD ACS FUNNEL VISCOSITY(aA,0 CULATE&CONDITION FAIRWEATHER 1 RHEOLOGYTEMP (°F) IPPING PTS 6 R60CM300 RVICE RIG211 100WNTIMER6IR3 P/CUT DRILLING LINEPV(c-p) VNI.RING IRELINE SURVEYSYP (Ib/100 flN GGINGOIUVuATER (%VoD UN CASING/OEMENT1 UVI OM36m GELS 11 100 AIT ON CEM1ENTAPI FLUID LOSS (ccl3— PPLE ON UP/DOWN BOP'SHTHP FLUID LOSS l=0hm)in) STBOP'S CAKEAPT/HT (1 _ 16-DRILL STEMTEST UNC RETSOLIDS DE, 117 - PLUG BACK CORRECT SOLIDS (%Vop 16-SQUEEZECEMENT CIL (%Vag 19- FISHING UNOORR WATER (%Vol) 20 - DIRECTIONAL WORK OIUJJATER RATIO 21 -MISCELLANEOUS ALKAL MUD (Pum) T2 MEETINGS CL WHOLE MUD (mpQ 23 - WELL CONTROL SALT(%W) 24-COMPLETION LIME gq/bbl) 25- COMPLETION(STANDBV) TOTAL 31 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%VcD RIG FUEL 2,Bdo 3,000 e]2 4,708 ROD(11) SUPPORTFUEL 5,72] 6,000 T64 10,963 FLOW IN(gpm) TOTALFUEL 0,387 9,000 1,638 1 15,751 PUMP PRIES (p Q ROP (FPH) MET(bbbl) HSE pHTEMP SAFETY MEETINGS BEAR SIGHTINGS: None Dow (0) 1 2)7—OTHERWILDLIFE: None CHLORIDE$ba,A) gCCIDENTS: I None SPILLS: None HARDNESS (C.—) WEATHER 1 CAILYHIGH33°F DAILYLOW 10°F CASING OD Vol' GRADE MO NO MAX WIND/DIR SW 2D MAXWINDLHILL S°F Surface 10.75 45,5 3331 PRECIPITATION None VISIBILTY 10.00 m1 Intermediate 7.625 29 0595 COMMENTS None BHA DESCRIPTION LENGTH BHA. WTAIR BHA W I. MUO 1HR5. ON JARS ROT wi. P.0 WL 50 WT. ITORQUE - 91T DATA NO, 1 SIZE MAKE TTPE SER NO. NOZZLES RR IN OUT FEET HRS MB RPM ROP DP(ANNVEL) DC(ANNNEL) BIi NO. INNER OUTER DULL LCC SF11 GAUGE I I OTHER I RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS I EFF% ECD AV DP AVO BITHHP PUMP HHP 1 2 PRESSURE PARAMETERS PORE PRESSURE:I IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP GPM PRESS DEPTH GAG SHOWS CONN: TRIP: FORMATION: #2 SHOWDEPTHS ROPRelblunngAr GASMVU WC CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH ND NS I COORDINATES EM V. SECTION DUB wwv xaJleZ.nel WNIFi Inlmmaton Managemen[LLC var 051315V E�•f R � L EV6 r Alkaid Daily Completion Report VVELL:1 Alkatl#1 I CONTRACTOR: AIIAmencan OiNetl RIG: Rg 111 RPTDATE: 31252019 ACTIVITY: Complete SPUD DATE: IpRILLING SUPERWSOR I:I Pat Stewart AFE#: 2o19A22 I API#:50-223-2002400-00 DF5: DRILLING SUPERVISOR 2: Leonid Dnelloler LEASE: ADL 311704 REPORT 20 TOOLPUSHERI: Kevin MCDawel FIELD: Wticat DOL: TOOLPBSHER 2: RJ Krug ELEV: RKB: 17.50 LAST BOP TEST: 3AII2019 RIG PHONE #: 907-8024045 M0: 8,595 ND: 5485 NEXT BOP TEST: 3I25I2019 LAST SHOE TEST DATE: SHOE TEST: 24 HRFTG: HR9DRLG CSGHD: pFE AMOUNT: AFE CUM. 24HOUR Ftlwtestwell. Shut in, manger pressures. KIDdown N2. Bleed of AN2 to PTS. Pump KWB down tubing. Pump KM down IA. Unseal banger and packer, ctlse annuMr, ciculoo SUMMARY burn¢ under annular and BN bacIMkI AIII to wmk packer tlown. Unable to work pecker essemhly past 8140'. ACTIVITY Load As with Who and freshwater. Continue to address losses. Test ROPE Pump cement and plug back ZOl. PLANNED FROM TO HRS OPERATIONS 8:00 14:00 BA Flowtestwell. 18:00 42 w Bbdown PTSwth N2. Rgdawn N2ung. LlneuplAVPTS. Bleedback T80PSIon IAto PTS. 114:00 0:00 20:00 2.0 Rig down PTS lines. Rg uptppump KING down tubing. Takeon225 BBL90 NaCIBdne to mutl p'M15. ID:00 1 21:00 1 1.0 lBuilhead48B2Lotg.OKINGdmntublngatlBPW1100PSI. 21V0 1 2:00 1 50 lOulhead downlAwith SoKWR, Caught pressure at274 BBL Sway. 3BPM500PSI. Pressure became enstic. Total pumped 326 BBL. 200 1 300 1 1.0 IBOLDS. PN and Gose annularpmeenter. Continue Ming IA. venting N2 through choke fine to gas buster. 3A0 6:00 3D Laydown Hin,i-devembly.Agemptlo RIH,TIH108140'antl seltldwns aMlBmesinsame pHce agenpting tp worktbreugb. N ales: d HrRg Turns associated wgh PBAActirvAy TOTALHRS 24.0 MORNING UPDATE ITake on 22b SBL of Erne, losses at calculated 60 BPH. MUD RECORD MUD Water-Basetl MUD 2 Water-Basatl OPERATIONAL TIME SUMMARY PERSONNELONSITE TIME 1800 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOWLINE TEMP(F) 1-RIG UPtDOWN GREATSEAR 4 DEPTH/NDBO 2- DRILLING ALL AMERICAN OILFIELD 14 MUDWEIGHT?EMP gh/geQ 8.0 3-REAMING CRUZ 3 BOUDS(%VOD 4-CORING ACS 1 FUNNEL VISCOSITY poet) 5-CIRCULATE&CONDITION HES 4 RHEOLOGY TEMP (°F) e-TRIPPING FAIRVE THER 1 R 300IR3gD 7 SERVICE RIG PTS e RZOOR2100 8-DOWNTIME Rq/R3 9-SLIP/LUT pRILLING LINE PV (:P) 10- WIRELINE SURVEYS YP(W100ftI 11-LOGGING OII2YJATER (%VOA 12- RUN CASING/CEMENT 1001 Om130m GELS QG100 13- WAIT ON CEMENT API FLUID LOSS (uMOmm) 14 - NIPPLE ON UPTDOWN BOP'S HTHP FLUID LOSS(OU30mm) 15-TEST BOPS CAKE APT/HT (IQ2-) 16- DRILL STEM TEST UNC RET SOLIDS (%VoD 1T-PLUG BACK CORRECT SOLIDS(%Vp# 10-SQUEEZE CEMENT OIL(%Vo) 19FISHING UNCORK WATER (%Vol 20- DIRECTIONAL WORK OI WVATER RATIO 21-MISCELLANEOUS ALKAL MUD IPpmJ 22 -MEETINGS CL WHOLE MUD (mglL) 23 -WELL CONTROL SALT(%VB1 24-COMPLETION LIME(Iblbbfj 25-COMPLETION (STANDBY) TOTAL 35 EMOL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%Vo0 RIG FUEL 3,325 665 2,660 EGO ('Pg' SUPPORT FUEL 2,401 5,000 037 6,584 FLOW IN(gpm) TOTALFUEL 5,726 5,000 1,502 9,224 PUMP PHS(pe) ROP (FPH) MET QWbbQ HSE pWTEMP SAFETY MEETINGS BEAR SIGHTINGS: None PtMAf (0) 1) 2) OTHER WILD LIFE: None CHLORIDES(mgh) ACCIDENTS: None 'SPILLS: None HARDNESS(Ca+a) I I WEATHER DAILYHIGH 24°F DAILYLOW 14°F CASING 00 NT GRADE MO ND M10NDIDIR S10 MA%WINDCHILL 2°F Surgeca 10.75 455 3331 PRECIPITATION None VRABILTY In 00M Intermediate 7.625 29 8595 COMMENTS None BHA DESCRIPTION LENGTH BHA. WTAIR BHA WT. MUDI HR, ON JARS ROT N?. "UW, S.O WT. TORQUE BIT DATA NO. SIZE MAKETYPE SER NO. NOZZLES RR W OUT FEET HRS WOB RPM ROP DP(ANN NEL) DC(ANN NEL) BRNO. INNER OUTER DULL LOO SE4 G4UGE OTIEq RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AVDC BITHHP PUMPHHP 1 2 PRESSURE PARAMETERS POREPRESSURE.1 REDUCED PUMP RATES BG: MAX: I REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL IX1 TRIP: IFORMATION'. R2 SHOWDEPTHS ROP BeftmMu pMer GAS MUG WT. CHLORIDES REMARKS SURVEYDATA MD ANGLE 1 AZIMUTH TVD 1 NIS COORDINATES ENO V. SECTION DLS wnw.xewmt WaI InhrmaEon ManaVmanf LLC VBf0wlw Mt&A/ PNfETROLEUM Alkaid Daily Completion Report WELL:j Allied ad I CONTRACTOR: gfl American Oilfrep RIG: Rip 111 RPTOATE: 3UQ2018 ACTIVITY:22omCpkte SPUD GATE: ORLNG SUPERVISOR I: IL Pat Stewart AFE b: 2019A32 API p: 50-3-201128-OP00 DFS: GRILLING SUPERVISOR 2: LanniB Dmllinger LEASE: ADL 391704 REPORT NO: 27 T0DLPUSHERI: Kevin McDowell FIELD: Wildcat DOL T0OLPUSHER2: RJ Krug ELEV: RK13 17,50 LAST BOP TEST: 31112019 RIG PHONE Y: 1 907-0024045 MD: 8595 IWD: 0,405 NEXTBOPTIEST.1 31152019 1 LASTSHOETESTDATE: SHOETEST: 34 HR FTG: XRS DRLG: LSGHO: qFE AMOUNT: qFE CUM. 24H0UR SUMMARY Digoutlocation. Thawcutalq wrap ell Of PTS's Anes, Slowall Anestlearw0h N2,Pressuretest. Flowwell. ACTIVITY PLANNED Flaw wall. OPERATIONS 13 DO Continue thawing and wrapping tines for PTS. Dig out literati from blow. Cloerfinesror PTS. Pressure test area to 3500 PSI with N2. Flow wall, aide] tubing pressure 1500 PSI, IA pressure 2]80 PSI. Be9ia IA N2 rete at 400 SCFM. W600,4S Notes' 0 Hr Ry Tate associated who PU Activity TOTAL HRS 1 24.0 MORNING UPDATE Flowwell. MUD RECORD MUD1 Water-BasadMUD Water-Based OPERATIONAL TIME SUMMARY PERSONNEL ON. SITE TIME 1800 ACTNITY I DAILY CUMHRS COMPANY NUMBER FLOWLINE TEMP(°F) 1-RIG UPIDOVJN GREATSEAR 4 DEPTH (R) 2-DRILLING ALL AMERICAN OILFIELD 1 14 MUD WEIGHLTEMP(IMgag B.0 3-REAMING CRUZ 3 SOLIDS TV4 - CORING qC5 FUNNELVISCOSIT('(sINU 5- CIRCULATE BC0NDITI0N HES 4 RHEOLOGY TEMP ('F) 6-TRIPPITRIPPING FAIRWEATHER 1 R00R00 ]-SERVICE RIG PTS 3 2 R00RID0 e-DOWNTIME RSIR3 9 -SLIP/CUT DRILLING LINE PV 10 - WIRELINE SURVEYS VP owl wl DD ftti 1 11 LOGGING O11-WATER (%Vol) 12- RUN CASINGICEMENT 10L10M30m GELS (1W10011" 13 - WAR ON CEMENT 'API FLUID LOSS (ccROmin) 1 14 - NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOSS (cu 3Oma) 15 -TEST BOP'S CAKE APTAHT(1132') 10-DRILL STEM TEST UNC RET SOLIDS (%Vo0 17 - PLUG BACK CORRECT SOLIDS(%Vog 18-SQUEEZE CEMENT OIL RAVOB 19-FISHING UNCORK WATER(%Vop I20-DIRECTIONAL WORK OILWJATER RATIO 21-MISCELLANEOUS gLIWL MUD (Pa.) 22-MEETINGS CL WHOLE MUD (mgl1J 23 - WELL CONTROL SALT (%VA) 24 -COMPLETION LIME QbIbhQ 25-COMPLETION(STANDBY) TOTAL 35 EMULSTABILITY CONSUMABLES START RECEIVED USED TODAYS INV SAND(%Vag RIG FUEL 3,823 4116 3,325 ECD(ppg) SUPPORTFUEL 4,248 1,647 2,401 FLOW IN Spm) TOTALFUEL 0,071 2,345 5,726 PUMP PRES(p ) ROP (FPH) MET(Ibhbt) HSE ,H/TEMP SAFETYMEETINGS BEAR SIGHTINGS: None Fredric) 2) I OTHER WUDLIFE 1 None CHL0RIDES(m9IL) g11IUF1JT5: Nene ISPILLS: i Nona HARDNESS(Ca«) WEATHER pAILV HIGH 14°F DAILYLOW E'F CASING OD WT GRADE NO WD MqX WINDIDIR SW 10 MA%WIND CHILL -]'F 45.5 3331 PRECIPITATIONNone V...SILTY 10.00.1 29 0595 COMMENTS None BHA jr DESCRIPTION LENGTH BHA.N?gIR BHA so MUD HRS.ON JARS ROT`M, P.0 No, S.O WT. TORQUE OR DATA NO, 1 SIZE MAKE. TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP OP(ANNIVEL] DC(ANN.NEL) 1 BIINO. INNER OUMR DULL I LCC SEAL I I GsUGE OTHER I RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AV DP AVO BIT HHP PUMP HHP 1 PRESSURE PARAMETERS PORE PRESSURE:1 IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: Ci TRIP: FORMATION: 42 SHOWDEPTHS ROP Beb�eAunr�g Aber GAS MUD WC CHLORIDES REMARKS SURVEVDATA MD 1 ANGLE 1 AZIMUTH TVD 1 N5 COORDINATES Em 1 V. SECTION OLS xw.xe�ss.nel W011a InlarmaEon Mamwmenl LLC v 051315M ,, , t W IL aiIaPETROLEUM Alkaid Daily Completion Report WELL: Alkaid#1 CONTRACTOR:All Amencan OiNekl RIG: Rig 111 RPT DATE: 30W2019 ACTIVITY: Complete SPUD DATE: DRILLING SUPERVISOR I: Pat Sewed 019A32 API*:50-223-20029-90-00 DFS: DRILLING SUPERVISOR 2: Lonnie Orolliger ADL 391704 REPORT NO: 26 TOOLPUSHER 1: Kevin McDowell Wildcat JED DOL: TOOLPUSHER 2: RJ Kmg RKB: 1]50 LASTBOPTEST: 3/118019 RIG PHONE*: 90]-602-4045 6,595 N0: 8465 NE%T BOP TEST: m5Y2019 LAST SHOE TESTDATE: SHOE TEBT:24 HHRS D.I.: CSGHO: qFE gMOUNT: pFE CUM. 24 HOUR Continue thawing out PTS fined. Shut dawn operations due to storm. Begin digging out. SUMMARY ACTIVITY OM Out equgment. Blow PTS lines clear. Flow test wail. PLANNED FROM TO HRS OPERATIONS 600 10:00 4.0 Continue thawing Out PTS Ones and blowing dawn with N2. Blowkng snow condones deteriorating, abut down field0peralmns. 10:00 400 180 BOW, snow and OCCOSS mad blocked due tO drifts, feld Operations On hod. 4:00 6:00 2.0 Begin snow removal hom location, blow access road hom ANakl locationto OaYon highway clear. Notes: o Hr Rig Time assocuted wA0 P8q Activ2y TOTAL HRS 24.0 MORNING UPDATE Dig out Tmm Blow. MUDREOORD MUD.i Wat.1Based MUO2Water-Baded OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1690 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOW-INE TEMP (°F) 1 - RIG UP/DOWN GREAT BEAR 4 DEPTH]ND (fiI 2 - DRILLING ALLAMERICAN OILFIELD 14 MUD WEIGHT/TEMP(blgaQ 9.0 3-REAMING CRUZ 3 SOLIDS MVOQ 4 - CORING ACS 1 FUNNEL VISCOSITY PfgU 5- CIRCULATE B CONDITION HES 4 RHEOLOGVTEMP CF) 6-TRIPPING FAIRWTATHER 1 R600R3oo ]- SERVICE RIG PTS 6 R2001RI00 6-DOWNTIME MR3 9 -SLIP/CUT DRILLING LINE PV (oP) 10 - WIRELINE SURVEYS Y, (ILHOO t1- LOGGING OI✓WATER (%V0g 12- RUN CASINGICEMENT 105I10M3om GELS (IhI100ft 13- WAIT ON CEMENT API FLUID LCBS bAGOmb) 1 14- NIPPLE ON UP/DOWN BOP'S ' HTHP FLUID LOSS (cM30min) I15 -TEST BOP'S CAKE APTMT (=) 1 6 -ORIEL STEM TEST UNC RETSOLIOS (%VoQ 1]-PLUG BACK CORRECT SOLIDS(%VOg i6-SOVEEZE GEMENT OIL(%VoQ 19 FISHING UNCORR WATER(%VOQ 20-DIRECTIONAL WORK OIL/WATER RATIO 21-MISCELLANEOUS ALKAL MUD (Pam) 22 - MEETINGS OL WHOLE MUD (mgA-) 23- WELL CONTROL SALT (%W1) 24-COMPLETIIX4 LIME (Ibtbbfj 25 - COMPLETION (STANDBY) TOTAL 35 EMULSTABILIT' CONSUMABLES START RECEIVED USED TODAY'S INV. SAND(%VOQ RIG FUEL 4,15] 16] 3990 ECD(ppg) SUPPORTFUEL ],]54 FLOW IN (I TOTAL Put 1 11,911 1,920 9,991 PUMP PRIES UN) ROP (FPH) MET(INbb9 HSE PHITEMP SAFETY MEETINGS BEAR SIGHTINS:G None POMt(0) 1) 2) OTHER WILDLIFE: None CHLORIDES(mglL) ACCIDENTS inane SPILLS: None HARDNESS(Caay MATH R. WEATHER DAILYHIGH 13°F DAILY LOW -6°F CABING 00 NT GRADE MO ND E43, Gusk 49 MPX WINO CHILL -34°F Sudace 10.75 45.5 33]1 PRECIPITATION I IN... IVIBIBILTY MI. mi Intermediate 7.625 29 6595 COMMENTS I None BHA DESCRIPTION LENGTH BHA.4NAIR BHA N? MUD HRS. ON JgRS ROT WT. P.0 WT S.O WT. TOROUS BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOE RPM ROP DP(ANNNEL) OC(ANN.NEL) WTI I INNER I I CUTER I DULLLOC SEAL GAUGE GT1ER RP HYDRAULICS DATA PUMP MAKE MODEL LINER STN SPM PSI GPM GPS EFF% ECD AV DP AVO OIT HHP PUMP HHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: IREDUCED PUMP RATES SG: MAX: REMARKS'. PUMP SPM PRESS DEPTH GAS SHOWS CONN' CIL #1 TRIP: FORMATION: #2 SHOWDEPTHS ROP Sabre .I; ACe1 GAS MUD WT. I CHLORIDES REMARKS SURVEYOATA MD ANGLE AZIMUTH TVD N5 COORDINATES E/W V SECTION OLE xwx"I—ne Well@ Inlmmabon MawalmenI ver051315V El°If OtLEUM Wr Alkaid Daily Completion Report WELL: AIkaM#1 M annerism Oilfield RIG: R9111 RPT DATE: MD2019 ACTNITY: Complete:DRILLING SUPERVISOR 1: Pat SteweftAFE#; 2019A22 API#:50-22}20029-00-00: DRILLING SUPERVISOR 2: Lonnie Dellinger LEASE: ADL 381704 : 25 TOOLPUSHER IKevin McDowell ftCONTMCTOR:: FIELD: Wildcat T0OLFUSHER 2: RJ Krug ELEV: RKB: 1].50 3/112019 RIG PHONE#: 90]-802-4045 MD: 8595 N0: 0485 3252019 LAST SHOE TEST DATE: SHOE TEST: 24 HR FTG: HRS DRLG: CSGHD: AFEAMOUNT: AFECUM. 24H0UR Wail an HES N2 pump truck mr repair Begin lq Ransoming with N2. No Pow to test sepentor. Sbutdownand DegMimUDleshoovngtmmMiborb PTSMrblockage. Weeleftopen SUMMARY at N2bkedermsuAingnmi Mgevehl,FAst Aled02released. Find ice plugs behind SSV on PTS um, Continue attempting to thaw PTS. ACTIVITY Thaw PTSequipmenLblowdown.MN2,and Fbw Test Alkaid#1. PLANNED FROM TO HRS OPERATIONS 690 1190 5.0 Wakan HESN2pumptluck. Rip up N2 equipment and P-testires. Good. 11:00 20:00 9.0 Begin pumpng N2 down A at ]50 SCFM, Dbse,e N2 buiB upto 3000 P51 well nP frow beck to PTB ung. 2000 BAD 10.0 Find ice plug in PTS line and low spotat(he ng. Valve on N2bleederle-open when amr9uPWbulBead N2downtud,N. Mistofdownh0le0uMrekased. ACSnoWed responded to cleanup.naris. Ped cleaned and off pad dlineated and cleaned. ESOmated 5 gaflons released N mist. Ccnlinue to address PTS ice plugs and blow down Anes. Nates: 0 Hr Rg Time associated with P8A Activity First Alert 02 released for misting event. TOTALHRS 24.0 MORNING UPDATE JWBIJ shut M. Teublash0aling ke plugs in PTS and. MUO RECORD MUD1Water-Based MU02Weler-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1800 ACTIVITY DAILY CUMHRS COMPANY NUMBER FLOWLINE TEMP PF) 1-RIG UPA) AI GREATSEAR 4 DEPTHTVD(a) 2-DRILLING I ALL AMERICAN OILFIELD 14 MUD WEIGHT/I'EMP(Ihlgal) 90 3-REAMING CRUZ 3 SOLIDS (%Vag 4 - CORING TO _S 1 FUNNELVACOSITY(s/gt) 5- CIRCULATE It CONDITION HES q RHEOLOGY TEMP rF) 6-TRIPPING FAIRWEATHER 1 R800rR300 ] -SERVICE RIG PTB e R200rH100 8-DOWNTIME RM3 9-SLIP/CUT DRILLING LINE PV (cP) 10 - WIRELINE SURVEYS YP QW100 an 11- LOGGING OINNATER(%VOD 12- RUN CASINGMEMENT t CMI 0 W30m GELS Pat 00ft 13- WAIT ON CEMENT 'API FLUID LOBS (cV30min) 14 - NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOBS (Semh) 15 -TEST BOP'S CAKE APTMT (1/321 18 - DRILL STEM TEST UNC RET SOLIDS (%VmQ 1 1]-PLUG BACK CORRECT SOLIDS P%Val) 18-SQUEEZE CEMENT OIL (%VaD 19- FISHING UNCORK WATER (%Vo6 20-DIRECTIONAL WORK OItNJATER RATIO 21-MISCELLANEOUS ALKAL MUD (PP.) 22-MEETINGS CL WHOLE MUD (mgn-) 23 - WELL CONTROL SALT(%W9 24-COMPLETION LIME dl 25-COMPLETION(STANDBY) TOTAL 35 EMULSTABILITY CONSUMABLES START RECEIVED USED I TODAYS INV. SAND (%VOD RIG FUEL 5,]19]81 4,938 CD (pp SUPPORTFUEL 9,194 1.14T.],754 FLOW IN(gpm) TOTALFUEL 14,913 2,221 12,692 PUMP FRES (pal) ROP IF MET dch6 HSE pHREMP I SAFETY MEETINGS BEARSIGHTINGS: None PVMf(0) 2) OTHERWILDLIFE: NoneCHLORIDES (mgiL) NT5: 'None SPILLS Flmt Alert 02-Misting eventHARDNESS(Ca++) ER DAILYHIGH 0°F DAILYLOW -12°F CASING OD WT GRADE MO NDMIR NE 23 MAX WINDCHILL -30°FSurtdc¢10]5455 3331ITATION None VISIBILTY ].00 mi ntermediate ].625 VWNDMIRj 29 0595NTS Blow expected this moming. BHA IPTIQV BHA. WT AIR . MUO HRS.ON JARS . PUVYI'. TORQUE BITDATA NO, I SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP OP(ANNNEQ DC(ANNNEQ BRNO. INNER OUTER CULL ISE4I GAUOE O1HEft RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AVD BIT HHP PUMPHHP 1 2 PRESSURE PARAMETERS POREPRESSURE:11 IREDUCED PUMP RATES BG: MAX: REMARKS 1 PUMP SPM 1 PRESS DEPTH GAS eHOW3 NN: CL •1 FORMATION: k2 SHOWDEPTHS ROPBNwe ing Mei GAS MUD WT. CHLORIDES REMARKS SURVEY DATA MD ANGLE AZIMUTH ND NIS COORDINATES ENJ V. SECTION 0L8 wm¢¢Wlaz.nel WeIIEZ InMmation Manapemern LLc ver 051315V t VE6Uitr ETR Alkaid Daily Completion Report WELL: AlkaU%1 CONTRACTOR: All Amencan Onto RIG: Rig 111 RPT DATE: 3212019 ACTIVITY: Complete SPUD DATE. DRILLING SUPERVISOR I: Pal Stewart AFE#: IMNA122 APIN: W-22120029-D600 DFS: DRILLING SUPERVISOR 2: Loone DmlMger LEA8E: AOL 391]04 REPORTNO: 24 TOOLPUSHERI: KeWn MCODweY FIELD: VAdcat DOL: TOOL-PUSHER 2: RJ KmO ELEV: RKB: 1 1150 LAST BOP TEST: w112019 RIG PHONE.. 9D]-002JW5 M0: a595 W0: 8,405 NEXT BOP TEST: 3252018 DIST SHOE TEST DATE: SHOE TEST: 24 HR FTG: HRS ORLE: CSGND: All,gMOUNT: AFE CUM. 24HOUR Fbwteslwel. N2 unA equpmen[breaktlown. Shutnwell. SUMMARY ACTIVITY N2 equipment on to way. Flow testwel. P gNNED FROM TO HRS OPERATIONS 0:00 23A0 17.0 jImUstwell. N2-]DO CFM at 1535 M1rs. N2 arountl corner at 18:45 M1rs, observe synifcent msponse e[choka aH ]:DO M1rs, Reduce N2 to 500 CFM. Reduce N2 10 950 CFM al t]:3D to menage. in-flow. 23:00 8:00 7.0 N2 pumping un8 equpmeNt breaktlown. Shutnwell farN2 mecM1an'tal issues. SITP 600 PSI. Notes: 0 Hr RM Time aet.ciatad wLh P&A AGivily 06:00- 00:00 Rig on sten rate. TOTALHRG 34.0 MORNING UPDATE j.SI shut m. MUD RECORD MUD WalervBasetl MUD Water-Basal OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOWLINE TEMP (°F) 1 -RIG Ul I OWN GREAT BEAR EPTHtIUD%V VD 2-DRILLING ALL AMERICAN OILFIELD 14 IGHTl MUD WEIGHT?EMP (Iblgef) 9.0 3-REAMING CRUZ 3 SOLIDS (%VoO 4 - CORING ACS 1 FUNNELWSCOSIW(spp 5- CIRCULATE B CONDITION HIM 2 RHEOLOGYTEMP FF) 6-TRIPPING FAIRWEATHER R000/R300 ]- SERVICE RIG PTS ] R200n2100 0-DOWNTIME HES FRAC CREW 5 RWR3 9- SLIP/CUT DRILLING LINE LYNDEN 2 PV (cF) 10 -WIRELINE SURVEYS YP owl 00Ito 11 -LOGGING OILANATER (%Vol) 12-RUN CASINGICEMENT I WI OmYJOm GELS (Iw100A 13 - WAIT ON GEMENT API FLUID LOSS (CWOmin) 14 - NIPPLE ON UPMOWN BOP'S HTHP FLUID LOSS (cd3Dmp) 15-TEST SOP'S CAKE APTMT (1132') 18 - DRILL STEM TEST UNC RET SOLIDS (%Voo 17 - PLUG BACK CORRECT SOLIDS(%Voo 18-SQUEEZECEMENT OIL (%VOQ 19-FISHING UNCORR WATER (%Val) 20- DIRECTIONAL WORK CII-MATER RATIO 21 -MISCELLANEOUS ALKAL MUD Mom) 22-MEETINGS CL WHOLE MUD (mglL) 23 - WELL CONTROL BALT Dow) 24-COMPLETON LIME Owbb9 25-COMPLETION (STAND" TOTAL 39 EMUL STABILYTY CONSUMABLES START RECEIVED USED TODAY'S INV. AND (%Vol) RIG FUEL 2.000 4,500 781 5,719 ECD(ppg7 SUPPORTFUEL 5.0261 5,0001 1,832 9,194 FLOW IN(gpm) TOTAL FUEL ],026 10,500 2,813 14,913 PUMP PRES (pso ROP (FPH) MBT Owbbo HSE pH?EMP SAFETY MEETINGS BEAR SIGHTINGS Nan! 2) OTHERWILDLIFE: Nona CHLORIDES CHLORIDES (m94.) C - ACCIDENTS: None SPILLS: None - HARDNES6(Ca++) WEATHER DAILYHIGH -12°F DAILYLOW 2°F CASING OD WT GRADE k10 WD MAXWINDIDIR N1] MA%WIND CHILL -24°F SuOace 10.]5 45.5 3331 PRECIPITATION Nona VISIBILTY 1000 mi Inleumatliate 7.625 29 1 8585 I COMMENTS None BHA DESCRIPTION LENGTH BHA. IM1T1AR BHA 4N. MUD HRS. QV JARS ROT Wrf. P.0 YN S.O Wi. TORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS MB RPM ROP DP(ANNNEL) DO(ANNNEL) BIT NO. INNER OVIERDULL LOC 6E4 GAIIC¢. OT1ER RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% EOG AVDP AVG C BIT HHP PUMP HHP 1 2 PRESSURE PARAMETERS POREPRESSURE:1 IREDUCED PUMP RATES SG: MAX: REMARKS. PUMP SPM PRESS DEPTH GAS SHOWS CONN' CL' 1 %1 TRIP: FORMATION: 42 SHOWOEPTHS ROP MaraLunnBAeer GAS MUD WT. CHLORIDES REMARKS SURVEYOATA NO ANGLE AZIMUTH WD NG COORDINATES ENV V. SECTION DLS �.x I—nN WeIIUlnbimadon Mai omaMLLO ve 051315M a.T m tVE►.Ui1r Alkaid Daily Completion Report EM WELL: A&aldol CONTRACTOR: AYAmedran Oilfeltl RIG: Rig 111 3202019E7LRE, mplete SPUD DATE: DRILLING SUPERVISOR t: PalStewnt 2019A22 29-00.00 DFS: DRILLING SUPERVISOR 2: Londe DmRn9er REPORT NO: 23 TOOLPUSHERI: Kevin McDowell IRPTDATE: DOL: TOOLPUSHER2: RJ Kreg 0 LAST BOP TEST: 3/112019 RIG PHONE Y: 90]-602-4045 8,595 85 NFXT BOP TEST: 3/252019 LASTSHOE TE ST DAT CSGHD: AFEAMOUNT: AFE CUM. 34 HOUR Pressure test PTS lines. Atlempt to Oowtast well. Found tubing PWggetl-believeb be ice plug. Pump heated bone down annulus, thaw tubing out, FlowtestweR. SUMMARY ACTIVITY Flaw test well. PLANNED HAS FROMM001.0 OPERATIONS 6:00 Pressure test PTS lines T/SOO PSI Low, 3500 PSI HIg11. RN N2 to A. Open lA, pbsarve 380 PSI prior to pumping nitrogen. 8:00 Open up tubing to PTS, no flow observed Pump N2 tlown W, no communication Observed to Tubing. Attempt to Bullhead N2 down tubing. Observe pressure build up on tubing- Rlgtlown N21rom Tubing. Rip uP rh310 pump tlown TubNg. Atlempt to bullM1ectl diesel down tubing wflh no success, several atlempts to %00 PSI merged M n0 approximately 05 BBL pumped to build pressure. Heat suction pit w4h SO PPG NaCl to 100 F degrees. Bothered 60 BBL heated bone down IA M2 BPM wtlM1 n0 monbring 3500 PSI moped tubing pressure, bktl off aper 15 BBL pumped, Line up to pump down tubinp, disconnecting PTS to mltgate mm in dawnsheam BUMead 10 B8L healed bMe tlown tubing. 0.5 BPM 500 PSI, 20:00 Pump diesel ahead to PTS. Pressure test line to 3500 PSI to test tine break. Good Rlg up N2 reversing Yne ham tubing to IA manifold, 2100 22:00 1.0 Open tubing and observe 2]S PSl on tubing pressure gauge. Flow test weY. 2g BBL back. Flow sopped. 22:00 22:30 15 Lineup N2101ubing and blow PTS back. Coe up N2 a0WAAma and pump down tubing: observed pressure spike antubhg before breakNgfree. 2330 600 6.5 Flowtestwell, Fluldbackat Oe:U0hm,19SBB8LTR, Notes' 0 Hr R'N Time associated With PBA AMNYy AOGCC Senior Petroleum Engineer Jim Regg grentad ] day exlenslon on BOP Test Merval. ITOT�HRS 24.0 MORNING UPDATE Flaw test Well. MUD RECORD MUD Water-Bassall MUD Water Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 ACTIVITY DAILY OUM HRS COMPANY NUMBER FLOWJNE TEMP CF) 1-RIG UPNOWN GREATBEAR 4 DEPTH"D(it) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTNEMP(blga17 90 3-REAMING CRUZ 3 SOLIDS (al 4 -CORING ALB FUNNELVISCOSITY 5- CIRCULATE &CONDITION HES 2 CF)(such RHEOLOGY TEMP CF) e-TRIPPING FAIRWEATHER 1 R600IR300 ]-SERVILE RIG PTS ] R200iR100 8-DOWNTIME HES FRAC CREW 5 RB/R3 9-SLIP/CUT DRILLING LINE LYNDEN 2 PV (JP) 10- WIRELINE SURVEYS YP Mt Dflnl 1 11•LOGGING OgN✓ATER (%VOD 12 -RUN CASINGICEMENT 10s/10m130m GELS (NVIt00fl°t ') 13- WAIT ON CEMENT API FLUID LQ35 (ccGOminJ 14- NIPPLE ON UPIDOM BOP'S HTHP FLUID LOGS (cM3 15-TEST BOP'S CAKE APT/HT (1132') 16-DRILL STEM TEST UNC RET SOLIDS puVoD 1]-PLUG BACK CORRECT SOLIDS(%VoD 18-SQUEEZE CEMENT OIL (%VOD 19- FISHING UNCORR WATER hi 20-DIRECTIONAL WORK ONWATER RATIO 21- MISCELLANEOUS ALKAL MUO (Ppm) 22-MEETINGS CL WHOLE MUD (mgIL7 23- WELL CONTROL - SA-T(%Wi) 24-COMPLETION UME(bhbl) 25- COMPLETION(STANDBY) TOTAL 39 EMUL STABILITY CONSUMABLES START RECEIVED USED TOOAYS INV. SAND(%VoD RIG FUEL 4$58 2,258 2,000 EW (Ppg) SUPPORTFUEL 6,334 1,308 5,028 FLOW IN(gpm) TOTAL FUEL 10590 3564 ],1126 PUMP PRE3 (psi) HOP(FPH) MBTBb/bbD HSE pHTEMP SAFETYMEETINGS BEAR SIGHTINGS: None Fee 1) 2) OTHER WILDLIFE j None CHLORIDES(mgrl-) gCCIDENTS: None SPILLS' None HARDNESS(Ca+H WEATHER DAILY HIGH -5°F GAILY LOW -9°F CASING OD WT GRADE MD ND MA%WINDIDIR SW 22 MAK WiND CHILL -26°F Surface ID75 455 3331PRECIPITATION None VISIBILTY 10.00 m1 Intermediate ]825 29 6595 COMMENTS None BHA DESCRIPTION LENGTH BHA. WTAIR SHAWL MUD HR3.ONJARS ROT WT. P.0 Wi GO W]. TORQUE BMDATA NO. SIZE WOKE TYPE SER NO. I NOZZLES RR IN OUT FEET HRS WOB RPM ROP OP(ANN.NEL) DC(ANN.NEL) 6TN0 INNER CLOSER DULL I I LOS GUL GAUGE I FP HYDRAULICS DATA PU1MP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AV DC BITHHP PUMP HHP 2 PRESSURE PARAMETERS PORE PRESSURE IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: %1 TRIP: FORMATION. R2 SHOWDEPTHS ROP SdI,aDA, Aller GAS MUD WC CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH ND NIS COORDINATES EAv V. SECTION OLS wxv xell¢nN WeN@IM—d-Meia9-11LLC c051315M E T R O L E U r Alkaid Daily Completion Report WELIL:j ABaitl#1 1 CONTRACTOR: AA American Oiflield RIG: Rig111 RPT DATE: 3119/3019 I ACTNIN: Complete SPUD DATE pIN LUNG SUPERVISOR I: 1 Pat armed AFE #: 2018A22 API p: 5022;.20029-00-00 1 DFS: DRILLING SUPERVISOR 2: Lonnie Dmlinger LEASE: ADL 391704 REPORT NO: 22 TOOLPUSHERI Kavi. MLDOwefl FIELD: Willoat DOL: TOOLPUSHER 2,1 RJKmg ELEV: RKB: 1].50 LAST BOP TEST: 31118019 RIG PHONE tl: 907-8021065 MD: 0,595 ND: 8,685 NEXT BOP TEST: 385/2019 LAST SHOE TEST OgTE: SHOE TEST: 24 KR FTG: HRS WILD: CSGHM AFE gMOUNT: ARE CUM. 24HOUR Pressure test PTS Anes t050,PSI low, 3000 PSI high. Address several Oaks In fine. Presseretear good. Open tubing to flow bad. No communication heaven. PTS and well.Break SUMMARY Wesendfindge. Break lines apart and thaw ice Prem Wes. Make Was up, test Was with nAmgen to verify integray, and fluq pack with diesel. ACTNIN Test PTSlinesend0owtest Alkaltl#1201. PLANNED FROM TO HRS OPERATIONS 8:00 1300 ].D Pressuremed PTS linesto 530 PSI bw, 3000 PSI high. Open well and obser_v5PSl on tubing guage. Nopressumobservedat PTSspreed. BUllheatl N2down and observe no Com norrmtnn to PTS. Blood of pressure from A. Break low spot in PTS spread and find ice. 13'.00 2000 7.0 Break PTS lines beck Omugb spreatl end Ontl lcenlnes tM1rou6hout. Using rip bailer steam. begin to thaw Fries antl do.10 We. 20:00 j 3:00 ].9 Make up allPTSnonnections antl very all connections are tgM. 3:00 6:30 1.5 Rig u0 tliesel lines to mud pumps. Rig up nitrogen to test Ines back to PTS, 430 600 1.5 1 Pressure test PTS Wes with Nitrogen to 390 PSI, Notes: 0 Hr Rg Time associated w8M1 PEA ActNBy ADGCC Senior Petmkum Engineer Jim R., granted ] day Wenaii n on BOP Test Interval. TOTAL HRS 24.0 MORNING UPDATE Flow test wetl. MUD RECORD MUD1 Water-Basert MUD 2 Wate'D45ed OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 ACTIVITY OgILY CUM HRS COMPANY NUMBER FLOWLINE TEMP PF) 1-RIG UPADOWN GREATSEAR 4 DEPTHITVD(tl) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTITEMP(Idgai, 9.0 3-REAMING CRUZ 3 SOLIDS (%Vo0 4 - CORING ACS 1 FUNNEL VISCOSITY duct) 5- CIRCULATE S CONDITION HES 2 RHEOLOGYTEMP(°F) e- TRIPPING FAIRWEATHER 1 R600M300 ] - SERVICE RIG PTS ] R200Rt100 8-DOWNTIME HES FRAC CREW 5 RBIR3 9- SLIPICUT DRILLING LINE LYNDEN 2 PV (op) 10 - WIRELINE SURVEYS YP(Vi n0 011-LOGGING Oft-WATER.(%Val) 12 - RUN OASINGnEMENT 10VIOml30m GELS dIdI1D0 13- WAIT ON CEMENT API FLUID LOSS (cG30mcd 14- NIPPLE ON UPIDOM BOP'S HTHP FLUID LOSS (cc Omin) 15-TEST BOP'S CAKE APTIHT (1I32') 1 16 - DRILL STEM TEST UNC RETSOLIOS (%Vol) II-PLUG BACK CORRECT SOLIDS (%Vog 10-SQUEEZE CEMENT OIL (%VOD 19- FISHING UNCORR WATER (%VoI) 20- DIRECTIONAL WORN OILANATER RATIO 21-MISCELLANEOUS ALKAL MUD (Pon) 22 - MEETINGS CL WHOLE MUD (mgA) 23 - WELL CONTROL SALT (%WI) 24 -COMPLETION LIME ONbbh 25- COMPLETION (STANDBY) TOTAL 39 EMULSTABILITY CONSUMABLES START RECEIVED I USED TODAY'S INV. SAND(%Vol) RIG FUEL4,]08 532 4,256 ECD(pMd SUPPORTFUEL 8,3]6 1,308 5,028 FLOW IN(gpm) TOTALFUEL 11,122 1 1,840 9,282 PUMP PRIES (psi, ROP (FPM MBT(INbbi, HSE ,H/TEMP SAFETVMEETINGG 1 BEAR SIGHTINGS: None PMVf(0) 1) 2) OTHER WILDLIFE 1 None CHLORIDES (mgh) ACCIDENTS: thane ISPILLS: None HARDNESS(Ca+y WEATHER DAILYHIGH21°F DAILY LOW -1°F CASING OD WT GRACE MD ND MAX WIND/DIR E21 MAX WINO CHILL 0°F Surtace 10.]5 45.5 3331 PRECIPITATION None VISIBILtt 10.00 mi Intermediate ].625 29 8595 COMMENTS Nona BHA DESCRIPTICN LENGTH BHA. WTpIR BHA WT MUD HRS.ON JARS ROT WT. P.0 WT S.O Wrt_ TORQUE BIT DATA NO. SIZE MAKE I TYPE SER NO. NOZZLES RR N4 OUT FEET HRS WOB RPM ROP DP(ANNNEQ DC(ANNNEQ SITN. I INNER I I CUTER1 CULL LOC SEAL Gvuu E j O1HER I IRPI HYDRAULICS DATA PUMP MAKE MODEL LINER STN SPM PSI GPM GPS EFF% ECD AVDP AV OG BIT HHP PUMP HHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: IREDUCED PUMP RATES BG: MAX:=RE�RKS PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL:#1 TRIP: FORMATION#2 SHOWOEPTHS ROP Bofory unnB MMUOM. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD NIS COORDINATES ENV V. SECTION OLS --R. WdI&Inl—g-Mma,,t LLC ver 051315N &Mt VGI1/ Alkaid Daily Completion Report PETROLEUM Alkakl#1 CONTRACTOR: AYAmefican Ogfield RIG: Rig 111 182019 ACTIVITY: Complete SPUD GATE: DRILLING SUPERVISOR I: Pal Stewatl A22 API#:50.223-20029-C9-00 DFS: DRILLADL3917M Ml� REPORT NO: 21WHoet DOL: T00I.PUSHER 3: RJ Krug RKB: 1].50 LAST BOPTEST: 3/112018 RIG PHONE#: 90}-802-4045 .595 rvD:XR9 DRLG: CSGHD: AFE AMOUNT: AFE CUM. 24 HOUR Rg up HES FraGSOm. SUMMARY ACTIVITY FbwtestZOlon AlkaiE#1. PLANNED FROM TO NRS OPERATIONS 6:00 10:00 4.0 Rgup water Anes. Walerlanks x1105 Deg 1000 1T:30 2.5 Prime HES Frec hoes. Valve one-up improperon dg Bop.. Cban LVT#pm pqe shed. 12:30 1300 OS PJSM nor Fre, operations. 1300 1730 3.5 Forfomr DFIT/MiniFro, t ]:JO 19:30 2.0 Perform Frac wph HES pumpuoIL I. 72K LBS Proppent. 19:30 2130 2.0 Rg down HES FraCCrews. 21:30 28:00 1.5 Rig tlown and plow down all HES Frec Ones. 23:00 4'.30 5,5 FIT pp PTB lines fmm spread to Ig. 4:30 6:00 1.5 jejum for PTS. Prime ITS lines from PTSspread, preparato Pressureteat Mes. A J1 Notes: 0 Hr Rig Tore associated with PBA AGiMy AOGCC Senior Petmkum Engfru eN'an Regg granted } tlay extension on BOP Test interval. TOTALHRS 23.0 MORNING UPDATE Pressure test ITS lines. MU0 RECORD !MUD 11 Water -Based MUD Water-Basetl OPERATIONAL TIME SUMMARY PERSONNEL ONSITE TIME 18:110 ACTIVITY I DAILY CUMHRS COMPANY NUMBER FLOW -INE TEMP ('F) 1 -RIG UP/DOWN GREAT BEAR 4 OEPTHITVO IB) 2 -DRILLING I I ALL AMERICAN OILFIELD 14 MUD WEIGHT/TEMP(Ib/gap 9.0 3 -REAMING CRUZ 3 SOLIDS (MVop 4 - CORING ACS FUNNEL VISCOSITY (spQ 5- CIRCULATE B CONDITION HES 2 RHEOLOGY TEMP('F) S -TRIPPING FAIRWEJTHER 1 RGOORi300 ] -SERVICE RIG ITS } R200IR100 8 -DOWNTIME HES FRAC CREW 5 R6/R3 9-BLIP/CUT DRILLING LINE LYNDEN 2 PV (CP) 10 - WIRELINE SURVEYS YP eat oO fo 11 -LOGGING OIUWATER (%Voe 12 -RUN CASING/CEMENT t OVIOrN30m GELS (IW100fl 13 - WAIT ON CEMENT API FLUID LOSS (cG3Omin) 14 - NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOSS (cG30min) 15 -TEST BOP'S CAKE APTMT (1132') 16 -DRILL STEM TEST UNC RET SOLIDS (%VOD 17 -PWG BACK CORRECT SOLIDS(%Vop 18 -SQUEEZE CEMENT OIL (%VDI) 19 -FISHING UNCORR WATER (y Vop 20 -DIRECTIONAL WORK OIUWATER RATIO 21- MISCELLANEOUS ALI(ALMUD (Pam) 22 -MEETINGS CL WHOLE MUD (mg1L3 j 23- WELL CONTROL SALT (%W) 24 -COMPLETION LIME (Xmbp 25-COMPLETION(STANDBY) TOTAL 39 EMULSTABILITY CONSUMABLES START RECEIVED USED TODAYS INV. $AND(%V00 RIG FUEL 1,955 3,540 707 4,788 ECD(ppg) SUPPORTFUEL },}38 1,459 1,404 7,793 FLOW IN(gpm) TOTAL FUEL 9,593 4,999 2,111 12,581 PUMP PRIES (ps) ROP (FPH) MBT (Iblbbp HSE pH/TEMP SAFETYMEETINGS BEAR SIGHT(NGS: None PBMf (0) 1) 2) OTHER WILDLIFE: None CHLORIDES(nI ACCIDENTS: None ISPILLS: None HARDNESS(C... ) WEATHER I DAILVHIGH 21 •F OgILV LOW -1°F CASING OD W,5 GRADE ND MAK."TATIe MAKWIND CHILL 001 o7OJ5 S�rIig—MIDESCRIPTION Non None VISIBILTY 1000 mi 29COMMENTS 29MENTS None BHA IPTION TH BHA. WTgIR WT. MUD HRS. ONJARS P.0 WT T. TORQUE BIT DATA NO, SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB 11 RPM ROP DP(ANNNEQ DC(ANNNEQ BITNO.1 I INNER I OLTERI I DULL I I LOU I I SLAC I I GAUGE I I OTHER I IRPI HYDRAULICS DATA o(k(pl� IL (r PUMP MAKE MODEL LINER SM SPM PSI GPM GPS EFF% ECD AVOP AVDC BRHHP PUMP HHP 1 2 PRESSUREPARAMETERS PORE PRESSURE:j IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: #1 TRIP: FORM4TION, A2 SHOWDEPTHS ROP BOfONDunng Mer GAS MUD NT. CHLORIDES REMARKS SURVEVDATA MD ANGLE AZIMUTH TVD NM COORDINATES Em V. SECTION OLS rw "Iw .W WAS, InWmMon Monepamen[ LLC Ver 051315W &Mt amr PETROLEUM Alkaid Daily Completion Report WELL: AIkaIEk1 CONTRACTOR: Aq Amatican Oiftl RIG: Rg 111 RPTOATE: 3/1712019 ACTNITY: Complain 8P..O.T.: pRILLING SUPERVISOR I: Pat StewaR AFE p: 2019A22 AP10:50-223-2002MID-00 DFS: DRILLING SU PERVIB0R 2: LOOa¢DmInger LEASE: AOL 391704 REPORTNO: 20 TOOLPUSHER I: EO CastaOneMevin McDowell FIELD: Warcat DOL: TO0LPUSHER2: RJKm9 ELEV: RKB: 17.50 LAST BOP TESTL 3/112010 RIG PHONE%; 807-002-4045 MD: 8,505 TVD: 8.485 NEXTSOPTEST: 3/1012019 LAST SNOE TE ST DATE: SHOE TEST: 24 HR FTG: I HRS DRLG:CSGHD; AFEAMOUNT: APE CUM. location to Deatlhome for pair, Rig perronn maintenance 24HOUR "do HEB Fnd,drn crew, to 6nbb work for snapper operator. HES Fricauim crew, Uemobdan nonnperat'rve pump unit train re SUMMARY an tg. ACTIVITY HES Fnc/Stim crew mubil¢e to ARaitl location. PeRmm FracrSOm operations. Flowtest weY. PLANNED FROM TO HRS OPERATIONS 6:0D 6:00 1 240 HES Frac tlemobAzeo non-ope2live pump truck from location to work an in Deaohorae shop. Rig wod, on boiler issues and replace dutch bub Mr dowam Ms. Notes: 0 Hr Rig Time associatetl with PSA Activity TOTAL R. 24:0 MORNING UPDATE lWaft on Fraccrew. New pump truck Amorid at 0745 HR on location. MUD RECORD MUDWater-Basetl MUD2Watnradind OPERATIONAL TIME SUMMARY PERSONNEL ONSITE TIME 1890 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOW-INE TEMP (°) I - RIG UPADOWH GREAT BEAR 4 OEPTHMD(ft) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHT?EMP(Ib/gag 9.0 3-REAMING CRUZ 4 SOLIDS'%Vo1) 4-CORING ACS 1 FUNNEL VISL..ITY(1 5- CIRLUI-ATE B CONDITION HES 2 RHEOLOGYTEMP (°FJ 6-TRIPPING FAIRWEATHER 1 Rfi00rR300 7-SERVICERIG PTS T LOOPS 8-DOWNTIME HES FRAC CREW 2 R.113 8-SLIP/CUT DRILLING LINE PV (cP) 10- WIRELINE SURVEY& YP QN100 A°I 11-LOGGING OI WJATER (%V0f) 12 - RUN CASING/LEMENT 10s/10m30m GELS (IN100fto 13 - WAIT ON CEMENT API FLUID LOSS (cw30mg) 14-NIPPLE ON UNDOWN BOP'S HTHP FLUID LOSS ha,30min) 15-TEST BOP'S CAKEAPTAT (1/32] 16-DRILL STEMTEST UNC RET SOLIDS (%Vag 17 - PLUG BACK CORRECT SOLIDS(%Vol 1 16-SQUEEZE CEMENT OIL (%VoQ I 19-FISHING UNCORR WATER(%Vol 2r,-DIRECTIONAL WORK OINVJATER RATIO 21 - MISCELLINE0US ALNAL MUD (Pom) 22-MEETINGS CL WHOLE MUD (mg)L) ONTROL SALT (%Wp ETION LIME (bAb� ETION(STANDBY) TOTAL 35 EMUL STABILITY CONSUMABLES START RECEIVED USED TOOAYS INV. SAND(%V.D gPUEL RIG 2,660 665 1,995 ECD(ppg) UEL 8,980 1,242 ],7311FLOWIN (g P)L 11840 1,907 9,733 PUMP PRES (Psi) ROP(FPH) MBT(ILNbI) HSE pH?EMP SAFETYMEETINGS BEAR SIGHTING&: None PNMT N) 1 2) 1 OTHERWILOLIFE None CHL0RIOES(m9R) ACCIDENTS: I None SPILLS: None HARDNESS (Co..) WEATHER OAILV HIGH 11°F DAILY LOW 1 -1°F CASING OD AT I GRADE NO MNOAIR PX WI E26 MAX WIND CHILL -24 Sutlace 10.75 45.5 33333 1 PRECIPITATION None VISIBILN 1.]5 .75ml INemletllale ].825 29 0595 COMMENTS Blcw coming an Monday, up t030 MPH Work-1 in of snow BHA DESCRIPTION LENGTH &HA. WTAIR BHA WT. MUD HRS. ON JARS ROT WT.I P.0 tNT TORQUE BITDATA NO. SIZE MAKE TYPE 1 SER NO. NOZZLES RR IN OUT FEET HRS 1 WOB j RPM 1 ROP OP(ANNJVEL) DC(ANI BITN.j I INNER I I WTER I DULL L. SFJL GAUGE OTHER RP HYDRAULICS DATA PUMP MAKE MODEL LINER SM SPM PSI GPM GPS EFF% ECD AVDP AVD BR HHP PUMPHHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: REDUCED PUMP RATES BG'. MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN ICL: #1 TRIP: FORMHTION: #2 SHOWDEPTHS ROP BAo¢IWmg Aam GAS MUD WC CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD NIS COORDINATES ENV V. SECTION Ol5 ww.w IwnM WMID Int—Mm MenegemeM LLL vwDA31514 ,►Great Bmr Alkaid Daily Completion Report ETROLEUM WELL: All At I CONTRACTOR IAN American OkfieM I RIG: Rig 111 RPT DATE: 3/18/2019 gCTIV1TY: Camplak SPUD DATE: DRILLING SUPERVISOR I: Pat Stewart AFE N, 2019A22 qPl%:50-223-20029-00.00 DFS: ORILLING SUPERVISOR 2: Lonnie Chalir,, LEASE: ADL 391704 REPORTNO: 19 TOOLPUSHERL Ed Casttgae FIELD: WIMLat DOL: TOOL -PUSHER 2: RJ Krug ELEV: RKB: 1>.50 LAST BOP TEST: 3/112019 RIG PHONEiI: 90]-602-4045 MD: 0Sea WD: 8.485 NEI(T ROP TEST: 3/182019 LAST SHOE TEST DATE: SHOE TEST: 24 HR FTG: JHRS DRUG: I CSGHD: I AFE AMOUNT: AFECUM. 24HOUR Latch onto otoftm 1. Pressure test WIN, and under hanger to 5000 PSI for30 minutes. Good Pressure test top ofhanger, below upper rams to 5000 PSI for]0 minutes. Good. Drop filing mit antl ilreguns. Positive gtlication at science that guns fired. OPSlontubing. Rg upon lAwilh rg pum forf'racsu rt. PTS100% tlu. Fnaccrewrt pon lA and OA. SUMMARY Free crew continue to work on P nto note p gu PUMP truck who maintenance crew and � up. HES Free crew dempbe personnel from location to pertormjob an other bratlon. ACTIVITY Wait on HES Frac crew to repair pump lmck and moblies personnel. PLANNED FROM TO NRS OPERATIONS 800 11:00 50 Continue roging up to circulate over with SBRllatch as5embty for Dn/ofiled. Work pita and afiemptto latch. UW48DW43. Wash Um tap of stub atS BPM. Tum otl sat d2in-3k on top ofstump, rotate string and observe set down fall off, positive Indication on surtace of pipe dropping over. Set down total of 10k. PN to 5k overto verity latch. Good Land hanger in barvl with total of20k down on packer. 1100 1 15:00 1 4.0 Riguptotestpacker. Test tubing string and under packer to 5000 PSI her 30 topped. Good Rig up and test lop ofhanger Antler pipe name to 5000 PSI Mr30 minutes. Good Rig dawn test equgment. 15:00 16A0 10 Rg uP Up pump Me to IA. Asset HES rig up on lit. 1600 1 16:30 1 0.5 Droppertoratingfidngbar. 4 min 30 sec after bar time, positive Indication o(gun firing on surtace. Monitortubotgpressure,0P61. 1630 1 19:30 1 30 IRig crews assist HES Fnac crew I up on well need. 1930 1 6:00 1 10.5 IHES Frac crew pull personnel Mrjab on other opetions. Notes: 0 Hr Rig Time associated with PBA Actvity TOTAL HRS 24.0 MORNING UPDATE Walt on Frac crew. MUDRECORD MUOt Water-Bese MUD2Water-Bated OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 ACTIVITY DAILY CUM HIRE COMPANY NUMBER FLOVULINE TEMP('P) 1 -RIG UPIDOWN I GREATBEAR 4 OEPTI US I 2 -DRILLING ALLAMERICAN OILFIELD 14 MUD WEIGHT/IEMP fib/gni) 90 3 -REAMING CRUZ q SOLIDS (%Yap 4 -CORING ACS 1 FUNNEL VISCOSITY (1 5- CIRCULATE B CONOITION HES 2 RHEOLOGY TEMP ('F) 6 -TRIPPING FAIRWEATHER 1 RBOO R300 ]-SERVICE RIG PTS 7 R200R100 6 -DOWNTIME LYNDEN 2 R&R3 9-SLIP/CUT GRILLING LINE HEB FRAC CREW 2 PV pep) 10 -WIRELINE SURVEYS MEYP owl00ry1 11-LOGGING TER (%Vaq 12 - RUN CASING/CEMENT 105I10insi GELS fila a 13 -WAR ON CEMENT API FLUID LOSS (acpOmin) 14- NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOSS (ccr30mid I TEST BOP'S CAKE APTIHT (1132") tfi - DR ILL STEM TEST UNC RET SOLIDS (%VUp 1] - PLUG BACK CORRECT SOLIDS (91 i6 -SQUEEZE CEMENT OIL (%VAD 19 -FISHING UNCORR WATER (%Vop 20 - DIRECTIONAL WORK OILNJATER RATIO 21 - MISCELLANEOUS ALKAL MUD (Por) 22 -MEETINGS CL WHOLE MUD (mi 23- WELL CONTROL SALT(%Wt) 24 -COMPLETION LIME pblbbp 25-COMPLETION(STANDBY) TOTAL 37 EMULSTABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND (%Vop RIG FUEL 3,591 931 2,660 ECD(ppg) SUPPORT FUEL 9.41] 437 8.980 FLOW IN (gem) TOTAL FUEL 13,008 1.368 11,840 PUMP PRES (pep ROP gi MITQWbbp HSE PHITEMP SAFET'MEETINGS BEAR SIGHTINGS: None Pfili1) 2) OTHERWILDLIFE: None CHLORIDES phi ACCIDENTS: None SPILLS: None HARDNESS(Caee) WEATHER DAILYHIGH 4•F DAILYLOW -10-F LA61NG OD WT GRADE MO WD MA%WIND/OIR E20 MAX WIND CHILL .25-F Surface 10.]5 45.5 3331 PRECIPITATION None VISISILTY 1.75 m1 Intermediate ].625 29 8595 COMMENTS BHA DESCRIPTION LENGTH BHA. 41rT AIR BHA WT. MUD HRS. ON JARS ROT WT P.0 Al 8.0 WT. TORQUE BITDATA NO. 1 SIZE MAKE TYPE SER NO, NOZZLES RR N OUT FEET HIRE WOE RPM ROP DP(ANNLVEL) DC(ANN NEL) BIT Ni WNER OU'rERI DULL LOC SFiV. GNIGE I OTH. I IRPI HYDRAULICS DATA pu MPI MAKE 1 MOOEL LINER STK SPM P51 GPM GPS EFF% ECD AVDP IAVOCI BITHHP PUMPHHP 1 PRESSUREPARAMETEAS I IREDUCED PUMP RATES BG: MPX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: #1 TRIP: FORMATION: i{Z SHOWDEFTHS POP BNareAu0y Plbi OAS MUDWT, CHLORIDES REMARKS SURVEVDATA MO ANGLE AZIMUTH TVD NIS COORDINATES ENV V. SECTION OLS xelW.nel WWUInfwmaMn Management LLC ve 051315M lAl��1/Cilr Alkaid Daily Completion Report PETROLEUM WELL: Alk— CONTRACTOR: All American Dead RIG: Rig 111 RPT DATE: 3/15/2019 ACTT ITY: Complete SPUD ME: Dan LINGSUPERVISOR I:I Pat Stewart APE Y: 2019A22 I APIN:50-223-20029-00.00 DFS: DRILLING SUPERVISOR 2: Lonnie Drollinger LEASE: ADL 391704 REPORTNO: 18 TOOLPUSHERI: EJ Castagne FIELD: Wildfowl DOL:J TOOLPaSHER 2: RJKrug ELEV: EPEE E. KB: 1]50 LAST BOP TES T: 3/112019 RIG PHONE K: 907-802-4045 MD: N0: 8485 NE%T BOP TEST: 3/18/2019 LASTSHOE TEST DATE: SHOE TEST: 24 HR FTG: HRS DRLG: CSGHO: ME AMOUNT:I I AFECUM. 24H0UR Set pecker, space out, and lantl M1anger,KILOS. Tacit ubingslrimandroackerfromb-pow,sOm PSIfar30mnutes. Good RgupmteOhangersead. CdsedbllrMramson Lending SUMMARY JOnt. Backout LDS. Pull lantlingjointand bangerto floor. Load out to Baker Machine and have new landing joint threaded and rep hied into running tool. Take equipment to HER completions shop to have hangar assembly, landing joint. and TIW tested to 9500 PSI for 10 minutes. Good Moblilize new binding joint antl hanger to location and pick up, RIH and ACTNITY Latch into oNORtool, land banger, testatingshing and peckerfrom below, 5000 PSI tm30 minutes. Test hanger seals 10 5000 PSI for 30 minutes. Perforate, hecatioulats ZOl. and PLANNED flowtest. FROM TO HRS OPERATIONS 6:00 1700 110 Sal parldwat 8119'. Rg up and attempt to test undartbe packer, leaked at 500 PSI. Unset and reverse c'eculdo to clear setting area. Reset packerate119'. during operetion packer to put up 5' before slips set. Final depth of packer set at 0115',Perbraling guns Top shat placement at 8153'. RILDS, Pressure test tubing string and undimpaclar assembly to 5000 PSI for 30 miaulea good. Rigup to test beNrean pipe rams and top of M1angerse0ls. Blind rams madvenlenty closed on landing joint, ma0er joint. 9:00 1 19:30 2.5 1 BOLOS, lift hanger off tubing bowl, disengage Bpm oul tool and pull hanger to rig floor. Back out hanger and binding joint Lay down and load out on truck standing by. 19:30 1 1:00 55 1 Mabtize landing joint to Baker Machne shop and have running sub mrad out, new tubing joint cut to length and mreatled and joinmunning tool bucked up. MobiiZenew lantling joint to HES completions shop to have made up and pressure tested Pressure test hangamersing joint assembly to 9500 PSI for to minutes, good Moblad embly to AIkaM Notion tram Dea.M1orse. 1:00 0:00 5.0 Unload landiagjoirumangerassembylopipeshed Pickup and RIH with landing joint and hanger. Attempt t,0 get back over overshot. Unable to with several attempts, Ismail increments to reorient. Rig up to reverse Nro me. Notes: 0 Hr Rig Time assodetetl with PBA Active, TOTAL HRS 24.0 MORNING UPDATE lRoverse circulate over onlafistub attempting to orshdown. MUDREOORD hal 1 Water'Basedl MUD 2 WaleRBasad OPERATIONALTIMESUMMARV PERSONNEL ON SITE TIME 1000 ACTIVITY pAILY CUMHRS COMPANY NUMBER FLOWUNE TEMP CF) 1 -RIG UPA)OWN GREATBEA 4 OEPTH/ND(d)2-DRILLING Al AMERICAN OILFIELD 14 1 MUO WEIGHT, EMP(Wlga) 9.0 3 -REAMING CRUZ 4 GOLIpO (%V00 4- CORING ACS 1 FUNNEL VISCOSIWpAt) 1 5- CIRCULATE B CONDITION HES 2 RHEOLOGY TEMP(°F) 6-TRIPPINO FAIRWEATHER 1 R800R300 7 -SERVICE RIG PT3 ) R20OM100 8 -DOWNTIME LVNDEN 2 RWR3 9- SLIPICUT DRILLING LINE HES FRAC CREW 4 PV (nP) 10- WIRELINE SURVEYS YP owl F0 11 -LOGGING OINNATER (%Von 12- RUN CASINCICEMENT I Wl On✓30m GELS (IM100621 13 - WAIT ON CEMENT API FLUID LOSS (cW30mn) 14 -NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOSS(casOmn) 15 -TEST BOP'S CAKE APTIHT (1132'7 1fi-DRILL STEM TEST UNC RET SOLIDS 1%VO) 17 - PLUG BALK CORRECT SOLIDS (%Vo) 10-SOUEEZECEMMT OIL (%VDI) 19- FISHING UNCORR WATER(%VOI) 1 20 -DIRECTIONAL WORK OIINJATER RATIO21-MISCELLANEOUS ALKAL MUD (Fora) 22 -MEETINGS CL WHOLE MUD (mgA) 1 1 23- WELL CONTROL SALT(%Wq 24 COMPLETION LIME(Iblbb) 25- COMPLETION (STANDBY) TOTAL 39 EMULSTABILITY CONSUMABLES START RECEIVED USEDI TODAYSINV. BAND"i RIG FUEL 4,389 798 3591 ECD (I SUPPORTFUEL 1Yp20 2,003 1 9,417 FLOW IN(gpm) TOTALFUEL 15,809 2.801 13,000 PUMP FRES (p5) ROP (FPH) MBT(II HSE PHREMP SAFETYMEETINGS BEAR SIGHTINGS: None P(MIt(0) 1)2) OTHERWILDLIFE: None CHLORIDES (MI ACCIDENTS: None ISPILLS: None HARDNESS(Caea) I WEATHER DAILYHIGH -10°F GAILY LOW -10°F CASMIG 00 AT GRADE MO ND MA%WiNDA3IR NE 24 MA%WIND CHILL -43°F Sudan 10.75 455 3331 PRECIPITATION Nona VISIBILTV 25 mi Intermediate 7,025 29 8595 COMMENrS BHA DESCRIPTIQY LENGTH BHA. WI BHAVH MUD HRS.ON JARS ROT WF. P.0 VJf B.O N? TOROUE BIT DATA NO. SIZE MAKE TYPE SERNO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANN.NEL) DC(ANNNEQ BITNO. INNER oulg - LCC BFAL GAUGE OTIF IRP HYDRAULICS DATA PU1MP MAKE MODEL LINER GM SPM PSI GPM GPS EFF% ECO AVDP AVO BIT HHP PUMP HHP 2 PRESSURE PARAMETERS PORE PRESSURE IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: 1 #1 TRIP: FORMATION: #2 SHOWDEPTHS ROPSe.Oe tlng AAm GAS MUD WT. CHLORIDES REMARKS SURVEYDATA MG ANGLE AZIMUTH TVD NIS COORDINATES ENV V.SECTION DLG .vnll¢.nrt Well& kklma4on Managamml LLC ver 0513154 WWr PETROLEUM Alkaid Daily Completion Report WELL: ABaitl R1 CONTRACTOR:AIIAmenwn OLBeM I U. Rg111 RPTDATE: 3/1412019 1 ACTIVITY" "amplate=REPORTNO:17 DRILLING SUPERVISOR I: Pat Stewart APE Y: 201 OA22 APIM:5o-223-211029-00.00DRILLING SUPERVISOR 2: Lonnie DmNnger LEASE: AOL 391704 1] TDOLPUSHERLE4 Castagne FIELD: VWtlTal TOOLPUSHER2: RJ Krug ELEV: RKB: t].50 /1112019 RIG PHONE k: 90]-802.4045 MD: 8,595 ND: 8405 3I18R019 LAST SHOE TEST GATE: SHOE TEST: 24 HR FTG: HRS BRLG: CSGHD: AFE AMOUNT: AFECUM. 24 HOUR Tnp out of the hole with 675" Scraper Assembly. SUMMARY Makeup and RlHwtlh TCP Assembly42 ACTIVITY- Set packer, space out, and hand hanger. Test packer from below antl test hanger fmm above. P ANNED FROMI TO I HRS I OPERATIONS 105 Trip out ofthe hole wM8T5" Scraper Assembly F/6234' T/Sulface. 0.5 6M��hTN..cmbl,�F/1308'TM09.r 25 Tin TCP Assembly#2F/Surface T/1308'. 1.0 Rnew oawho the ng.9.0 Tlh TOPAssemblyLL F/1306'TM090'. WorkRimughlghtspkfrom]868'N8090'0.5 S S Nates: 0 Hr Rg Time raaocwi Ed with P&A AG'rvRy TOTAL HRS 24.0 MORNING UPDATE Continue In the hole Is 8164'. MUD RECORD 1 MUD Water-Basetl MUD Water-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 ACTIVITY DAILV CUM HRS COMPANY NUMBER FLOVULI 1-RIG UPIOOWN GREAT BEAR q D(it)PCf7 DEPTH/ND(if) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHT/TEMP("ap 9.0 3-REAMING CRUZ 4 SOLIDS (%VoI) 4-CORING ACE 1 FUNNELMSOOSIWMD 5- CIRCUTATE B CONDITION HES 2 RHEGLOGYTEMP CF) 6-TRIPPING FAIRWEATHER R600Ifi300 )- SERVICE RIG PTG ] R200IR100 8-DOWNTIME LVNDEN s R6/R3 9.6LIP/CUT DRILLING LINE HES FRAC CREW 4 PV (cP) 10-" IRELINE SURVEYB YP (lb/100 fi'I 11- LOGGING OI VWATER (%Vo9 12 - RUN CASING/CEMENT 10s110M30m GELS (Ib/100R" 13 - WAR ON CEMENT API FLUID LOSS (ccGOmin) 14-NIPPLE ON UPIDOWN BOP'S HTHP FLUID LO33 (ce"B"I 15- TEST BOP'S CAKE APT/HT (1YJ2y 16 - DRILL STEM TEST UNC RET 80LIDS (!Wo' 17 - PLUG BACK OORRECT60LIDS(%VoIJ 18-SQUEEZE CEMENT OIL (%VOp I 19-FISHING UNCORR WATER (%Vop 20 - DIRECTIONAL WORK OILAVATER RATIO 21-MISCELLANEOUS ALKAL MUD (Pour) 22-MEETINGS CL WHOLE MUD (mgIL) 23 - WELL CONTROL SALT (%4N) 24-COMPLETION LIME (g/bbp 25- COMPLETION(STANDBY) TOTAL 42 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SANG(%Vop RIG FUEL 5,423 1,034 4,380 ECD(ppg) SUPPORTFUEL 11,420 799 10,621 FLOWIN (gpm) TOTALFUEL 16,843 153J 15,010 PUMP FRES (psp POP(FPH) MST(IbNbp HSE fooTEMP SAFETY MEETINGS BEARSIGHTINGS: None Pa.(0) 1) 2) OTHER WILDLIFE: None CHLORIDES( Jh) ACCIDENTS: I None ISPILLS: None HARDNESS (Ca++) WEATHER DAILYHIGH -1Z DAILYLOW -18°F CASING OD WT GRADE MD ND MJ(VMNDIDIR NE24 MAKWINDCHILL -43°F Samace 10]5 45.5 3331 PRECIPITATION None vnotnLN 2.5mi Intermetllate ).825 29 8595 COMMENTS BHA DESCRIPTION LENGTH BHA. WTAIR BHA WT. MUD HR&. ON JARS ROTWT. P U Wi - So WT. TORQUE BITo NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANN.NSL) DC(ANNNEL) BITNO I INNER OUTER DULL LOC SEAL. BRUCE OTHER RP HYDRAULICS DATA PU1MP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECO AVDP AVDCj BITHHP PUMPHHP 2 PRESSURE PARAMETERS PORE PRESSURE:j IREDUCED PUMP RATES BG: MAX: REMARKS; PUMP SPM PRESS DEPTH SHOWS O CONN: CL #1 TRIP: FORMATION: #2 SHOWOEPTHS ROPB me nngN r GAS MUD WC CHLORIDES REMARKS SURVEYOATA MD ANGLE AZIMUTH TVD N/5 COORDINATES EW V. SECTION OLS —.xv -n. WNI@Meragement LLL ver 051315V NI Gild x{11 Alkaid Daily Completion Report ETROLEUM WELL:Ahad 01 CONTRACTOR: AIIAme0can OJfiep RIG: Rig 111 RPT DATE: 3/1312019 ACTIVITY: Complete SPUD DATE: DRILNG LISUPERVISOR I: Pet Stewart APE 0:2019A22 1 APIN:50-223-20029-00-00 OF3: DRILLING 6UPERVI30R 2: Lonnla---linger LEASE: ADL391704 REPORTNO: 16 TOOLPUSHERI: Joe Steiner FIELD: Wieticat DOL: TOOLPUSHER 2: Ed Cestagne ELEV: RKB: 1 17.50 LAST BOP TEST. 31112019 RIG PHONE 90]-802-445 Me: 8,595 TVD: 8,485 NEXTBOPTEST: 3/132019 LAST SHOE TEST DATE: SHOE TEST: 14 HR FTG: HRS BRIG: CSGHD: AFEAMOUNT: AFEOUM. 34 HOUR AGemottowoAc'...".."fam...868'. mabletOwotk lhreugM1 wih severalattempls. Trip out ofthe hole with TCP Assecri Pick up B75' Scraper Assembly. Trip in to 0234', SUMMARY dressed off packer setting area at 0123'. ACTIVITY Top out Of the hole with 6,75' Assemby. Pick up and mn TCP Assembly Ali PLANNED FROM TO HRS OPERATIONS 8:00 10:00 4.0 Reverse circulate at I BPM. Set down at]866'. Sal down l0k. Pick up antl observed 10k even t0 pu8M1es. Continue to securities and recprocate and a8emptta wobcthar ht gM area. Set assembly direGlyaboveucturnion and attemptto wash by.UnableNwompast. O2ktlra9 bservatfarm obstruction W 10' above. Fri. clean above. UW 50 DW U. 10:00 1]:30 7.5 Tdp oN ofhe M1ok Fl]860'T/Surface. Ley down TCP Assembly #2. Inspect PLS Packer assembly. NO eNdence otdamage. InspeG ONOff shear out screw. Good. 10:00 05 Service R43 1800 1 1990 1 1.5 Makeup S]5'Scraper Assembly. 18:30 1 6:00 10.5 RFIwbh8.75"BIXaper Assemby Fl3urface TI823P. Observed 2k Set tlowne at 6054', 6286'. And 7248'. WOMetlscreperassemby across Kase ineervale. Wmketl amby across ]088', previous Imuble spot, antl 8123', packer seding depth. There were no Indications H ether the previous trouble spot or packer seffeng area that any obstmcOnn. Notes: 0 HrRg Time associatetl with P6A AGivtly TOTAL HRS 24.0 MORNING UPDATE lTdP out ofhe hole with 6]5' Scraper Assemby MUD RECORD MUD1Water-Basetl MUD2Walar-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1000 ACTIVITY DAILY CUMHRS COMPANY NUMBER FLOWLINETEMP (°F) 1-RIG UPAOWN GREATBEAR 4 DEPTH/ND (fl) 2- DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTrtEMP (Ih/gaD 1 9.0 3-REAMING CRUZ } 30LIDS (%VoD 4 - CORING ADS i FUNNEL VISCOSITY(slgq 5-CIRLUTATE &CONDITION HES 1 ftHECLOGYTEMP (°F) 6 -TRIPPING FAIRWEATHER R600/R300 ] -SERVICE RIG PTS ] R200R2100 8T DOWNTIME R6/R3 8 - SLIP/CUT DRILLING LINE PV (vP) 10- WIRELINE SURVEYS YP (IN100fl 11-LOGGING ORDWATER (%Vol) 12 - RUN CASING/CEMENT 10s110M30m GELS (IN100fl 13- WAIT ON CEMENT API FLUID LOSS (ccU0min) 14 - NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOSS (cG30mi) 15 -TEST BOP'S CAKE APTIHT Fii 18- DRILL STEM TEST UNC RETSOLIOS(%VOD .17-PLUG BACK CORRECT SOLIDS (%V.0 18-SQUEEZE CEMENT OIL (%VoD 18 -FISHING UNCORK WATER(%VoD 20-DIRECTIONAL WORK OIIIWATER RATIO 21-MISCELLANEOUS gLKAL MUD (POm) 22 -MEETINGS CL RMOLE MUD (mph) 23-WELL CONTROL SALT (%M) 24-COMPLETION LIME gblbb0 25- COMPLETION (STANDBY) TOTAL 31 EMUL 6TABILITY CONSUMABLES START RECEIVED USED TODAY'S INV. SAND (%VoD RIG FUEL 1,453 5,000 1,010 5.453 ECD(ppg) SUPPORTFUEL 7,143 5,590 1,321 11.420 FLOW IN(gpm) TOTAL FUEL 8,606 10,590 2,331 16,373 PUMP PRIES bosh ROP (FPH) MBT(lbi HSE ,1VTEMP SAFETYMEETINGS BEAR SIGHTINGS: None POMf(0) 1) 2) OTHER WILDLIFE I None CHLORIDES but ACCIDEN I None ISPILLS: None' HARDNESS(Ca++) WEATHER DAILY NIGH -]°F DAILY LOW d5°F CASING Op WT GRADE MO TVO ...... NE 13 MAX WIND CHILL d3°F SURace 10.75 45.5 3331 - PRECIPITATION None VISIBILTV IBaomi Intermediate 7.625 29 8595 COMMENTS BHA DESCRIPTION LENGTH BHA. WTAIR BHA WT. MUD HRS. ON JARS ROWi T P.0 4YT S.O WT. TORQUE - BITDATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS 1N00 RPM ROP DP(ANN.NEL) DC(ANN.NEL) BITNO. INNER OUTER Cut.LOC 3EAL WUGE OTIER RP HYDRAULICS DATA PU I MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECO 1 AVDP AVDCj BIT NHP PUMP HHP 1MP 2 PRESSURE PARAMETERS POREPRESSURE:1 IREDUCED PUMP RATES 9G:ftBafor�—g REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: #1 TRIP: #Z SHOWDEPTHS MUD AT. CHLORIDES REMARKS :GAS SURVEYDATA MO 1 ANGLE 1 AZIMUTH WD N5 COORDINATES EM 1 V. SECTION DLS xwxxallKne[ Wtll@Inbmle4on Manegemeni LLC er_051315d 1 l.}!(�il� Vm Alkaid Daily Completion Report PETROLEUM WELL: AIXaM#1 CONTRACTOR: All American Oilfieltl RIG: R0111 BUT DgIE: 3/122019 I ACTNITY.I Complete SPUD DATE: DRILLING SUPERVISOR I: Pat Stewart AFE#: 2019A22 I API#:50-22320029-00-00 DFS: DRILLING SUPERVISOR 2: Lonnie Dmllinger LEASE: ADL301704 REPORT NO: 15 TOOLPUSHERI: J. Stene, FIELD: wildcat DOL: TODLPUSHER 2: Ed Caktapne ELEV: RKB: 1250 LAST BOP TEST: 3/1 '12019 RIGPHONE#: 907-802-4045 MD: 0,595 TVD: 0,405 NEXT BOP TEST: 3/182019 Lg3T SHOE TEST OgTE: SHOE TEST: 24 HIS s OR HRbly#2a CSGHO: AFE AMOUNT: AFE CUM. 24HDUR Pick up TCPAssemby #2 end RIH TO860'.Observed setdown. unable l0 get past. Pkh up ark rig up to reverse ckculete. 24HOUR: SUMMARY ACTIVITY Reverse circulate and attempt to wash by 0bsinuelaa RIR to seting depth. PLANNED FROMI TO I HRS I OPERATIONS 800 9:30 9.5 MakeupTCPASsemMy#3. Mebil'Re1Ilup Suband GLMfor TCP. lnstalland RlH. 9:30 12:00 2.5 AflermakingupGLM,PacheIset antl unable to release,189' MI 08nsuft town serake manager regardng packer release. Rg upte asitietellb d.wr Yughtt. release Rg up to assist with down weight to release Parker With rip floor winch and hydraulic ams. Provide enough down fame release upper sties. 12:00 14:00 2.DLay down TCP Assemb"2 to inspect packer. Found OnI shear screw had sheared. Replaced Shear screw Mr OnlOff Redressed packer shear out screweas pRventative measure to mitigate stresses from unseating. 1090 2930 6.5 Trip in the hole F/SUHoa Ta924' 20:39 2190 9.5 Barak. Rig 21:00 21:30 0.5 Repair rg -Hose on S.0.1 coolant system had a leak. Repaired and verified. 21311 400 8.5 Triple the bele F/2924'TO888'. 400 500 1.0 Set darn areest=n at]860'. Unable to work PastafterSaVeralademPts. Several tunes up1810kevertopulllree. 590 6:00 1.0 Rg up to reverse c'vcula" to Clear abStruction. Nat45: 0 IT, Rg Mine associated with PSA Ae ivtly TOTAL HRS 24.0 MORNING UPDATE lAftesupting to wasM1 (brougM1 ObsWcbon, reverse CiRulef g. MUDRECORD IMUD 1 Water-Based MUD 2 Water-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1800 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOWUNE TEMP (*F) 1-RIG UPTOWN GREAT BEAR 4 DEPTH/ND(0) T. DRILLING ALL AMERICAN OILFIELU 14 MUD WEIGHT"EMP(Ib/gag 9.0 3-REAMING CRUZ SOLIDS (%V0Q I 4-CORING ACS 1 FUNNELVISOOSITY(s/Al) 1 5- CIRCULATE B CONDITION HES 1 RHEOLOGYTEMF IT) e- TRIPPING FAIRWEATHER 1 R69UR300 ]- SERVICE RIG PTS ] R20OM100 T00WNTIME REFS 9- SLIP/CUT DRILLING LINE PV (c 10 -WIRELINE SURVEYS YP owl 00 fl°I I 11-LOGGING OILNJATER t%VoA 12-RUN CASING/CEMENT 10WRLDm GELS OWIOCR21 13 - WAR ON CEMENT API FLUID LOSS (cu30min) 14 - NIPPLE ON UPTOWN BOPS HTHP FLUID LOBS (WJ9min) 15-TEST BOP'S CAKE APT/HT (IM-) 18- DRILL STEM TEST UNC RET SOLIDS (%VoD 17 - PLUG BACK CORRECTSOUDS(%V.g 18-SQUEEZE CEMENT OIL (%Ve) 19 -FISHING UNCORR WATER (%Vold 20. DIRECTIONAL WORK OI.ATER RATIO 21 - MISCELLANEOUS ALKAL MUD (Pom) 22 - MEETINGS HOLE MUD(mgn.) 23-WELLCONTROL T(%Wp 24 -COMPLETION (mach) 25- COMPLETION (STANDBY) TOTAL 31 L STABILITY CONSUMABLES START RECEIVED USED TODAYSIRVD(%Vo) RIG FUEL 2.394(ppg) [ROP SUPPORTFUEL ],832 489WIN(9pm) TOTAL FUEL 10,020PFRESTN)(FPH)pVeI) HSE EMP SAFETYMEETINGS BEAR SIGHTINGS: None (0) 1) T) OTHERWILOLIFE: None CHLORIDES(mg/L) ACCIDENTS: ryona SPILLS: None HARDNESS (Cay+j WEATHER DAILYHIGH -]'F DAILYLOW -15-F CASING OD WT GRADE MD TellMAXWINDIOIR NE26 MAXWINO CHILL .3]'F Surface 10.75 455 3331 PRECIPITATION Light Brew VISISILTY 1.50 mi IatermedMl. 7.625 29 0595 COMMENTS BHA DESCRIPTION LENGTH BHA. WTAIR BHA Wf, MUD HRS. ON JAR. ROT WT. P U V#f ..ON?. TORGUE BIT DATA NO. SIZE MAKE TYPE ISERNO.i NOZZLES RR IN OUT FEET HRS =8 RPM ROP OP(ANN.NEL) DG(ANMNEL) BIT NO INNER WTER MULL LOc BEgL Uxu. OTIEB RP HYDRAULICS DATA PUMP MAKE MODEL LINER ST( SPM PSI GPM GPS EFF% ECD "DP AV OCI BITHHP PUMP HHP 1 2 PRESSURE PARAMETERS PORE PRESSURE IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAG SHOWS CONN: CL: #1 TRIP'. FORNRTION: #2 SHOW DEPTHS ROP BOme rI, Ane, GAS MUD W. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH ND NB COORDINATES ENJ V. SECTION DLS wx -il—t Well@ Inwmakn Wnagemenl LLC ver 0513150 JW&mt&Ar Alkaid Daily Completion Report ETROLEUM WELL: AlkaM#1 CONTRACTOR: AXAmetican Oilfil RIG: Rig 111 RPTDATE;j 3/112019 1 ACTIVITY:1 Complete SPUD DATE: GRIL LING SUPERVISOR 1: Pat Stewaho APE A, 2019A22 j API#:50-22120029-00-00 DFS: DRILLING SUPERVISOR 2: Lannie D.Ilinger LEASE: ADL391704 REPORTNO: 14 TOOLPUSHERI: Joe Steiner FIELD: Va t DOL: TOOLPUSHER 2: Ed Castagne ELEV: RKB: LAST BOP TEST: 3h 112019 RIG PHONE#: BO]-6O2dOd5 MO: 6,595 ND: 0,405 NE%TBOPTEST: amma9 LAST SHOE TEST DATE: SHOETEBT: 24 HR FTG: HRS.111. CSGHD: AFEAUDUNT.I AFECUM. 24 HOUR inp o. or Ne note term Cement Retainerto surface. Rig up and school. SOPtestto2501.1 Pow, 3000 PSI nigh. Test LEL and 1125 alarms. AOGCC Test"ness waived by Fairmount SUMMARY Inspector Jeff Jones. Piakup TCPAssembly#2T/l20'. ACTIVITY Trg In me hole PLANNED to ZOI, set packer and perforate. Rg up antl wmission Frac antl PTS upera00ns, FROM TO HRS OPERATIONS 6'.00 2.5 Tnp Out eflhe h0le With Cement Retalner Assembly F/0330'T/Sutleae. 2.a 18 OD 2:00 10.0 I Rig up test equipment and 2-718 -test joint Test Annuzrpreventer,UPR,Blinds,Choke 3nevalves,Choke Manlrold VaNes, Kill One Valves, and OoorvaNesto 250 PSI 5000 PSI Hgh. Perform Accumulator drawdown test. Test all H2S and LEL alarms. ADGCC test wmess waived by Petroleum Inspector Jeff Jones. Rg down rest equipment, blow down choke manffolq choke Bees, and kit tines. 200 5:30 4.0 PIG up TCP Assemby#210120'. 5:30 6.00 0.5 Soma rig. BIOGs, Cr0 sn, and Dhc.ml N01es: 0 Hr Rig Time associated with P&A ActNXy AOGCC BOP Test witness waived by Pshale um Inspector Jefl Jones. TOTAL HRS 17.0 MORNING UPDATE Making up TCP Assemby#2 MUD RECORD MUDI Water-Bacetl MUD Water-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1800 CTIVITY DAILY CUM HRS COMPANY NUMBER FLOWUNETEMP(°F) UPMOM GREAT BEAR 4 DEPTHMD(0) LLING ALL AMERICAN OILFIELD 14 MUO WEIGHT/TEMP Huma0 9.0 MING CRUZ 3 SOLIDS (%Vog ING ACS 1 FUNNEL VISCOSITY (spp ULATE&CONDITION HESRHEOLOGY TEMP CF) PING M RODOM300 VICE RIG 200MIGO NTIMERdl /CUT DRILLING LINEPV (cP) ELINE SURVEYSYPOW1008'I GGING OIINVATER (%VOg 12 -RUN CASING/CEMENT 10910 V30m GELS gb/10011°1 1 13-WAIT ON CEMENT API FLUID LOSS (ca/30mm) 14 m NIPPLE ON UPA OWN BOP'S HTHP FLUID LOSS (ca5Dmin) 15-TEST BOP'S CAKE APT/HT (1YJ2'y 16 - DRILL STEM TEST UNC RET SOLIDS (%Vo' 17-PLUG BACK CORRECT BOLID. I%Wil 16-SQUEEZE CEMENT OIL(%Vol 19-FISHING UNCORR WATER (%VOg 20 m DIRECTIONAL WORK OI AVATER RATIO 21 -MISCELLANEOUS ALKAL MUD (PO.) 22-MEETINGS CL WHOLE MUD (mg&) 23 - WELL CONTROL SALT(%Yl'D ]4-COMPLETION LIMEgblbb0 25 -COMPLETION (STAND" TOTAL 7 28 :EMUL STABILITY CONSUMABLES START RECEIVED USED TOOAYS INV. AN. (%VOf) RIG FUEL 9182 796 2.394 EGO(ppg) SUPPORTFUEL 0,514 002 7,832 FLOW IN (gpm) TOTAL FUEL 11,706 1,680 10,026 PUMP PRE. (ps) ROP (FPH) MET (Wbbg HSE pH/TEMP SAFETYMEET04G& BEAR SIGHTINGS: Nan. Pi/Mf (0) 1 1) 2) OTHER WILDLIFE: None CHLORIDES aril 1.MENTS I None ISPILLS: None HARDNESS (C.1-) WEATHER DAILY HIGH 1 10'F DAILYLOW -7'F CASING 00 I WT GRADE MD ND MAX WINDMIR BE 25 MAX WIND CHILL -31 °F Success 10.75 455 3331 PRECIPITATION Light Blowing Snow VLIBILTY 1.50 mi Intermediate 7.625 29 8585 COMMENTS BHA DESCRIPTION LENGTI BWLN?AIR BHA WT. MUD HRS.ON JARS ROT AT S.O WT. TORQUE BITDATA NO, SIZE MAKE TYPE SER NO, NOZZLES Rft IN OUT FEET HRS WOB RPM ROP DP(ANN.NEU OC(gNNNEU SUNG. INNER INTER w, LGC SEFL GAUGE OTHER RP HYDRAULICS DATA PUMP MAKE MODEL LINER GM SPM P51 GPM GPS EFF% ECD I AVDP IAVOC BITHHP PUMP HHP i 2 PRESSURE PARAMETERS POREPRESSURE.1 IREDUCED PUMP RATES BG:MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS ..NN: OL #1 TRIP: FORMATION: #2 SHOWDEPTHS ROP Beble ng Ayer GAS MUD WT. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH ND N5 COORDINATES ENV V SECTION IDLE ..11 Well Information Management LLC ver 051315V W6mr Alkaid Daily Completion Report PETROLEUM WELL:Pset Alkad#T CONTRACTOR:AY American Oilreltl RIG: Rg 111 RPTDATE:ACTNRY: Complete SPUD DATE: DRILLING SUPERVISOR I: Pat Stewart AFE#:API#: 50-223.20029-0600 DFS: DRILLING SUPERVISOR 2: Lonnie Omllinger LEASE:AOL 391704 REPORTNO: 1J TOOLPUSHER 1, Joe Steiner FIELD:WMcet OOL TOOLPUSHER2: Ed Castagne ELEV:RKB: 1].50 LAST BOP TES T: 3/3/19 RIG PHONE #: 907-802-4045 M0:WD: 8,485 NE%T BCP TEST: 3/1021118 LAST SHOE TEGT GATE: SNOE TEST: 24HRFTG:HRS DRLG: CSGHO: AFE AMOUNT: AFE CUM. nt retainer at 0390. Attempt to establish circulaton from lower pertbimtlons through upper perfo2lons with SO PPG Brine. No go. Unsting "in cement retaln¢r. 24 HOUR 8.3 PPG fresh water. Sting "acement retainer. Attempt to establish through upper and lower perforations, both conventional and reversing. No go. Well breathing due SUMMARY to buMb¢adeding in sterol to establish circulatory perfumed eMmle test to verity. Unstngfmmretainer. Displaced well to 9.0 PPG Brine. Pom000 black squeeze cement job to lower —.11ralo- Union "IACTIVITY Tip out of the hole with cement retainer running lcol. Rgup andtest BOPS. Pick Up TCPAssembyand RIH. PLANNED FROM TO HRS OPERATIONS 9:00 030 2.5 Tdp In the M1olo wBM1 Cement Relaner Assemby FI632]'TI8390'. 630 1 1390 1 4.5 Set Packer 18390'. Rig up to circulate. Attempt to establlah cireulafwnthrough boXem pertoratlona to l8p pertoralions al0.5 BPM 1200 P311CP 600 P31 FCP. Pump 1390 fruit 5.9 Unsting ham cementretainer,displace 9.0 PPG Brine to 6.3 PPG freshwater ABempt to sstabl —mmmmunidmwo Nrou9M1 top pdiftNacre tob080m pedomtlons.Pump ways w8h no success. ICP goo PSI, FCP 500 PSI, Pump 5 BBL Ager containing Observed flowhack. Began a d.in test, flow back nuldir dd from 1111.5 BPH S BPH over 2 hound, confirmed decreasing trend Decand to displace well back to 9.0 PPG to perform Block Squall 1 son 22:00 4.0 Displace 11 from 6.3 PPG I'm UN090 PPG Bnn¢. 22:00 23'.30 10 Pump 20 I.L.B14.5 PPG LIaael Cement, chasew8h 48J BBL 90 PPG Brine. Unsling from cement retainer. Pump l BBL of cement on top of Cement round, 23:30 030 1.0 Lay down 2 J Ckwlate to Gearppe, 4 BPM 800 PSI. 1 2:30 20 Pump down for repeigtmubleshoot Los up Pumptto continue deatlng pipe. 2:30 3:]d 1 0 Load 9.0 PPG Been Into pits. 330 4:30 1.0 Circulate well to balance, 9.0 PPG M and out. 4-3 5:00 0.5 Rig down simulating assembly and blow down lines. Notes: 0 HrRg Time associated with P&A Activity AOGCC BOP Test 24 Hour Notification Made 31820191]:30 Hd 1 hour less doe to daylight savings time. TOTAL HRS 23.0 MORNING UPDATE Trip out births hole with cement retainer. MUD RECORD IMUD1 Winer -Basad MUD Water -Based 1 OPERATIONAL TIME SUMMARY PERSONNELONSITE TIME 1690 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOWLINE TEMP CF) 1 - RIG UP/DOWNI GREAT BEAR W 2 -GRILLING ICAN OILFIELD 14 IUD IGHTj MVO WEIGHT?EMP (b/ga) CRUZ1ALLA 9.0 3 -REAMING CRUZ SOLIDS (%Vol) 4 -CORING ACS FUNNEL VISCOSITY (W9U 5- CIRCULATE BCONDITION HES 1 RHEOLOGY TEMP CF) 6 -TRIPPING FAIRWEATHER 1 R60OM300 >- SERVICE RIG PTS 4 R200/R100 8 -DOWNTIME RVR3 9-SUP/CUT DRILLING LINE PV (CP) 10 - WIRELINE SURVEYS YP owl Go flim 11 -LOGGING OIINJATER (%Vol) 12 -RUN LASINGICEMENT 105I10TV30m GELS (IW100I 1 13- WAIT ON CEMENT API FLUID LOSS (cW30min) 14- NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOSS (0d30mn) 15 -TEST BOP'S CAKE APTIHT(t132') 16-DRILLSTEMTEST UNC RET SOLIUS (%.D t] - PLUG BACK CORRECT SOLIDS 18 -SQUEEZE CEMENT OIL (%Vol) 19- FISHING UNCORR WATER(%VPI) 20- DIRECTIONAL WORK OI.ATER RATIO 21- MISCELLANEOUS ALKAL MUD (Form 22 - MEETINGS CL WHOLE MUD (mglL) 23 - WELL CONTROL SALT(%Wt) 24 -COMPLETION LIME (II bb) 25- COMPLETION (STANDBY) TOTAL 28 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SANU(%VOo RIG FUEL 3090 ]98 3.192 EGO(Wg) SUPPORTFUEL 8,]5] 243 1 8,514 FLOW IN dem) TOTAL FUEL 12,]4] 1041 11,706 PUMP PRES (pe) ROP (FPH) MBT(IWbbO HSE PH?EMP SAFE MEETINGS BEARSIGHTINGS: Nona POMC 1) 2) OTHER WILDLIFE' None 1 RI CHLOHARDNDES(mg.) ACCIDENTS: None SPILLS: None HARDNESS(CO..)«7 WEATHER DAILYHIGH ii°F OAILV LOW e'F CASING 00 WT GRADE MO ND MA%WINOIOIR NE 22 MAX WINO CHILL -10 •F Surface 10.75 45.5 3331 PRECIPITATION Light Snow VISIBILTY 1 1.50 m1 Intermediate ].025 29 8595 COMMENTS BHA DESCRIPTION LENGTH BHA. WTAIR BHA W, . MUD HRS. ON JARS ROT AT, PL WT Is 0 WT. TORQUE BIT DATA NO. SEE MAKE TPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANN.NEL) DC(ANNNEL) 61TN0 INNER WTER GULLLOC SEAL GAUGE OTIFlt RP HYDRAULICS DATA PUMP MAKE MODEL LINER I STK I SPM PSI I GPM I GPS I EFF %I ECD AV DP AV pC BIT HHP PUMPHHP 1 2 PRESSURE PARAMETERS POREPRESSURE: IREDUCED PUMP RATES DO: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: Ci TRIP: FORMATION: 02 SHOWDEPTHS ROPa me nng Mer GAS MJ WT. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD NB COORDINATES EAN V. SECTION DLS wm Im.nw Wdia InbrmaOon Managemert ac vee 051315N �%#QAtOmr Alkaid Daily Completion Report PETROLEUM WELL: ANaid#1 CONTRACTOR: AA American OMI RIG: Rg 111 RPT DATE: 319/2019 I AOTNITY: Compkte SPUD DATE: DRILLING SUPERVISOR I: Pat Stewart PPE #: 2019A22 1 API p:50-223-20029-00-00 DFS: DRILLING SUPERVISOR 2: Lonnie DiollFger LEASE: ADL 391704 REPORTNO: 12 TOOLPUSHERL .Joe Steiner FIELD: WMcat DOL T00LPUSHER2: EO Costagne ELEV: IRKS: 17.50 LAST BOP TEST.' 3B/19 RIG PHONE p: 907-802-4045 MD: 8,595 TVD: 8,465 NEXT BOP TEST: 3/102019 LASTSHOE TE ST DATE: SHOETEST: 24 HR FTG: HRS ORLG: CSGHD: pFE gMOUNT: AFECUM. 24H0UR Tnpoutafthehole,laydown3-3B'TCPAssembly#1. RIH with E-Line and pedorete for circularvlg squeem cement job. Makeupcemenl retalnerassemblygmIRIH. SUMMARY ACTIVITY Set cement retainer. Displace well t0 freshwater, Pertomr wrtulating squeeze cement job. Pm1mra CBL. Test BOPS. PLANNED FROM TO HRS OPERATIONS 600 11:30 5.5 Trip Out of Ne hole with 3-3/8'TCP Assembly PL Lay down pa0kefa55embly and perforating guns. imSfire shot. 11:30 12:30 1.0 1 Load out Packer assembly, Perforating Guns, and Hanger assembly to HES. R/UAK-Efine. 1230 1 14:30 1 20 IRIH with AK-Elbe Perforating guns. COnente, fire guns, Top shot 0408' Bottom shot 6414'. Posifwe Indication at sudare guns Fred. 1430 1 17:30 1 30 IPOOH and M down E-Mne, lubricator, and sheaves. 1730 1 M01 1 2.5 Make uP cement reainerassembly, brain sack trip In past tap Of]-SB'pack-o#. 20:00 890 100 RIH wMh cement reamer F5urtaca TB847'. Nates: D Hr Rig Time associatod with PSA Actafty AOGCC BDP Test 24 Hoar NotifiOation Made 3/8120191]:38 His TOTALHRS 24.0 MORNING UPDATE lContInue tripping in with cement retailer, MUDRECORO IMUD1 Water-Basedl MUD WatervBased I PERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 ACTIVITY DAILY CUM ARE COMPANY NUMBER =LOW-NE TEMP VF) 1-RIG UPMOWN GREATBEAR 4 DEP1HIND(1) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTITEMP(Ib/gap So 3-REAMING CRUZ 3 SOLIDS (%Vap 4-CORING ACS 1 FU NNELVISCOSITY(sAbb 5- CIRCULATE &CONDITION HES 1 RHEOLOGYTEMP CF) 6-TRIPPING FAIRWEATHER 1 R60CR300 T-SERVIOERIG R2)0#i1U0 8-DOWNTIME RB/F3 9 -SLIP/CUT DRILLING LINE PV KF) 10- WIRELINE SURVEYS YP(IN100 fic 11-LOGGING OIIANATER pe Vol) 12-RUN CABINGICEIM£NT 1000rN30m GELS (I1,1100fl 13 - WAIT ON CEMENT API FLUID LCSS (OcC0m-) 14 - NIPPLE ON UPIDOWN BOP'S HTHP FLUID L0SS (4eplDim) 15-TEST POPE CAKEAPTIHTOM-) 16-DRILL STEM TEST UNC RET SOLIDS (%VO) 17 -PLUG BACK CORRECT SOLIDS (%VOD) 18- SOUEEM CEMENT OIL (%Vop 19- FISHING UNOORR WATER (%Vop 20-DIRECTIONAL WORK OILIWATER RATIO 21- MISCELLANEOUS ALKAL MUD (Pom) 22 - MEETINGS CL WHOLE MUD (mg/L) 23 - WELL CONTROL SALT(%4N) 24-COMPLETION LIME pdabbp 25- COMPLETION (STANDBY, TOTAL 24 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV SAND(%Vop RIG FUEL 4,TR >82 3,990 ECD (on) SUPPORTFUEL 8,900 143 8,75] FLOW IN (go.) TOTALFUEL 12,]4] 680 12,087 PUMP PRIES Ups) ROP (FPH) MBT(IGdb) HSE PHr1EMP SAFETYMEETINGS BEAR SIGHTINGS: None Pmf(0) 1) 2) OTHER WILDLIFE: None CHLORIDES(mg/L) ACCIDENTB: None SPILLS: None HARDNESS(Ca++)WEATHER DAILYHIGH 15°F DAILYLOW 12'F CASING 00 WT GRADE MD NO MpX WINOAIR E22 mph MA%WINO CHILL Surface 1075 455 3331 PRECIPITATION None VISIBILIV 9.00 mi Intermediate L625 29 8595 COMMENTS BHA DESCRIPTION LENGTH BHA. WT AIR BHAWT.MJDHRS.ON JARS RCT WI'. p.0 WF S.0— TORQUE BIT DATA NO, SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS =8 RPM ROP DP(ANNN -) DC(ANNNEL) BITNO. INNER OUTER 1 JLL 1 GAUGE I RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVOP AVD BITHHP PUMPHHP 1 2 PRESSURE PARAMETERS PORE PRESSURE:1 IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: #1 TRIP: FORMATION: V2 SHOWDEPTHS ROP BNmelcunng ORer GAS MUDWT. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD NIS COORDINATES EM V. SECTION DLS xell—et Wdu lrR —I.n Management LLc ver 051315M Nf Cil12 Wr Alkaid Daily Completion Report PETROLEUM WELE: ARab Mt CONTRACTOR: All American Oflleb RIG: R®111 RPTDATE: 318a019 AC TIVITY: Complete SPUD DATE: DRILLING SUPERVISOR I: Pat Stewart APE M: 201 PA22 API9:50-22320029-0090 DFS: DRILLING SUPERVISOR 2: Lonnie DmIlinger LEASE: AOL 391704 REPORTNO: 11 TOOLPUSHERI: Jr. stainer FIELD: Widest DOL: T00LPU11ER 2: Ed Castagna ELEV!RKB 17.50 EAST BOP TEST: 39119 RIG PHONEM: 907-8024045 MD: 0,595 TVD: 0,405 NEXT BOP TEST: 3H O(2019 LAST SHOE TEST DATE: SHOETEST: 24 HR FTG: HRS DRLG: CSGHD: AFEAMOUNT: AFECUM. 24HOUR Swabbed wel dawn to 8443. Rg down E-Line. Circulate 9.0 PPB KWB down tubing to perforations. Unseat hanger. CBU. and by down manger. Unseat PLS packer. Trip out a(the SUMMARY hale. ACTIVITY Trip out of the hole, lay down 3-39" TOP Assembly Ml. Perforate for cuculetmg cement. Run cement retainer and squeeze circulate cement behind 7-510" in ZOL Perform CBL. Test PLANNED BOPS. FROM TO HRS OPERATIONS 600 12.00 60 PerfOml 6 Polls with 2418'EVR-25 Type V-dng swab cups Pop! larval at 6430' Total Volume Bailed-41.5 BBL 12:00 1 13:011 1 1.0 IFig down AK-Eline lubrfcator, sheaves, and wkeMne l00%. 13:00 15:00 2.0 1 Pump down 2-7/8' Tubing to spot SID PPG KWB at Perforations, pump 65 BBL TR. Coughlpresmre at43SELL, continueto pump at l BPM, 900 PSI ICP, 750 PSI FOP. 400 PSI GTP. BOLOS from tubing M1anger. 15:00 16:00 10 Pick up he unseat hangs, Pull to 58K bar.. rangerca.. boss. UW 40K. 16'.00 10:00 2.0 Un-jay hom onlohtccl-CBq 3 SPM, 1200 PSI ILP, 700 PSI FOP. MWW,oUT9.DPPG. 18:00 1900 10 Continue circulating until all av6 circulated out o(the was 1900 21:00 j 2.0 Ley down landing jord and hanger assembly. Pick up a single from pipe shed Wtie back into packer. 21:00 0'.00 30 Unseat PLSpacker. Trouble gebing back into packer to pull lel abletogetbackbtothetopandreleasewhout issue. 0:00 600 6.11 Trip out of the hob with 3418" TOP AssembN M1 F18083TH346',UW29KDW29K Notes: 0 HrRM Thne associated with PM Activity ACGCC BOP Test 24 Hour Notification Made SAV201917:38 His TOTAL HRS 34.0 MORNING UPDATE MUDRECORD IMUD1 Water-Based MU02Water-Basetl I OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 1 ACTIVITY DAILY CUMHRS COMPANY NUMBER FLOWLINE TEMP CF) 1-RIG UPIDOWN GREATBEAR 4 DEP7WN0(10 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTITEMP gagap 90 3-REAMING CRUZ 3 SOLIDS (%Vol) 4 -CORING ACS 1 FUNNEL VISCOSITY(SAU 5- CIRCULATE S CONDITION HES 1 RHEOLOGY TEMP ('F) 6 -TRIPPING R600R3007-SERVICE RIG R200R100 8-DOWNTIME RWR3 9 - SLIP/CUT DRILLING LINE PV (0P) 10- WIRELINE SURVEYS YP Past be 11- LOGGING 011- WATER (%Vop 12- RUN CASINGICEMENT IDS1IOM30m GELS Home he 1 13 - WAIT ON CEMENT API FLUID LOSS (c min) 14- NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOSS (cM30mh) 15- TEST BOP'S CAKE APTMT (1132) 16 - DRILL STEM TEST UNC NET SOLIDS (%Vop 17 - PLUG BACK CORRECT SOLIDS(%Vop 18-SQUEUECEMENT OIL (%Vop 19-FISHING UNCORR WATER(%Vap 1 20- DIRECTIONAL WORK ORWJATER RATIO 21 - MISCELL4NE0U5 ALKAL MUD (Poub 22-MEETINGS CL WHOLE WO DI 23- WELL CONTROL SALT(%WU 24COMPLETION LIME, 25-COMPLETION (STANDBY) TOTAL 23 EMULSTASILITY CONSUMABLES START RECEIVED USED TODAYS INV. MIND(%Vop I RIG FUEL 5,453 1 731 1 4,722 ECD (ppg) SUPPORTFUEL 8.800 143 8,757 FLOW IN Wpm) TOTAL FUEL 14,353 874 13,479 PUMP PRES (p5D ROP (FPH) MBT(IMbbp HSE pH/TEMP SAFETYMEETINGS BEAR SIGHTINGS', None Pmf(c)f) 2) OTHERWILDLIFE: None CHLORIDES(mg&) AC CIDENTS: Nona SPILLS: None HARDNESS(Ca++) WEATHER DAILYHIGH 16 •F DAILYLOW 11°F CASING OD WT GRADE MD TING MAXWINDAIIR NEimpM1 MAX WINO CHILL -1°F Surface 1075 45.5 3331 PRECIPITATION No VISIBILTY 900 m1 Intermediate 7.625 29 0595 COMMENTS BHA DESCRIPTION LENGTH BHq.`MAIR BHA YN. MUD HRS. ON JARS ROT WT. P,U WT S.O ITORQUE SITDATA NO. SIZE MAKE TYPE SERHO. NOZZLES RR IN OUT 1 FEET HRS WOB RPM ROP DP(ANN.NEL) BC(ANHA7EU BITNO. INNER OUTER DULL LGC SEPL GAVGE I OTHER I IRPI HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AVD BITHHP PUMPHHP 1 2 PRESSURE PARAMETERS IREDUCED PUMP RATES BE MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL'. #1 Imp, FORMATION: #2 SHOWOEPTHS ROP Bekre unnaA r GAS MUDWI CHLORIDES REMARKS SURVEY DATA MD ANGLE AZIMUTH WD N5 COORDINATES EAN V. SECTION CLS FetleZ, Clel WYIFi Inlarmabon Mampemal LLCer_05131W N!mt&A Alkaid Daily Completion Report PETROLEUM WELE11 AIIA091 CONTRACTOR: All American Ci0iaN RIG: R9111 RPT DATE: 3gOIH9 ACTNIN: Complete SPUD DATE: GRILLING SUPERVISOR I: Pat Stewed .,E.![ FE M: 2019A22 API#: 50-22}20028-00.00 OFS-1 I DRILLINGSUPERVISOR 2: I Lonnie Dmllinger LEASE;j ADL 391796 1 REPORT NO:1 10 1 TGOLPDSHER I: Jae Steiner FIELD: NSMcat DOL: TOOLPUSHER 2: Ed Castagne ELEV: RM 17.50 LAST BOP TEST: 3/3/19 RIG PHONE p: 907-802-4045 MD: 9,585 ND: 0,405 NEXT BOP TEST: 3/1 Df1919 Lg5T 8HOE LEST DATE: SHOE TEST: 24 HR FTG: I CSGND: IAFE AMOUNT: qFE CUM. 24HOUR Rg up tit lA antl pressure test between bangerand paakerto 1500 PSI. Good test. RAJ PO9am slickllemeAlcatorand Yressureted, Perforate ZOL SwabwegfarguidsampNwn SUMMARY PDXaMSlieldne. ACTIVITY Oontinueswabbmgwellfarflugsamples, PLANNED FROMI TO I HRS I OPERATIONS 8:00 ]:00 19 Pressure lest IA from Tubing banger to PLS packertop to 1500 PSI fors minutes. Good test. Rig down Anes. ]:00 B:D9 1U Piakap swab cup assembly. RU up 1ubraus c.Pre$$Yce test lubdCdor to 2590 PSI, Good test. neaug, 090 B00 1.0 Line toto tubing- Pressure up to 3200 PSIUown Positive indication at surface pertoming guns( d. Pressure Impped to 600 PSI Mkeb'. stabilized at l]S PSI 30 minutes mon9atlng. Top shot 8062' MD. 9:00 1200 30 Pertorm]Aft MI I"'IV125 Type V-nng swab cups. FluM leveler 1030'. 12'.99 1490 1 29 15.6khah slLkllne spool Lay down bbtloator, cN bad IMe and rehead Swabbing Assembly. 16:00 15:00 1.0 Paconm l puseenz-0R"TX-MV646.SM swab was. Fluty level at 2304', Changedcupstylealmmaingtoge!better Aft. 15:00 2000 50 Going in for PUM#B,tlmmtlnve chain cracked. Clamp aflalkk lne. Remove and replace tlnve chain. 2999 100 1 5.0 Pedamt O PUTS with 2-0r8'BVR-25 Type V-nng swab cups. Fluty level at 5299' 1:00 8:00 1 59 Backlashslkl.nspaairequinnomaintenancaon SWklineun9.Mobil¢ebackupungtolocatea.RguPSASDWmand Lbr tor_ Notes' 0 Hr RU Time associated with PBA Activity TOTAL HRS 24.0 MORNING UPDATE Continue Swabbing Operations MUD RECORD MUDl Water-Ba1wi MUD3WatenBCaCd OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 18:00 ACTIVITY GAILY CUM HRS COMPANY I NUMBER FLOVNINE TEMP CF) I 1-RIG VP/DOWN GREATBEAR s DEFTHMD(M 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHT?EMP(Ib/gal) 9.0 3-REAMING CRUZ 3 SOLIDS CORING ACS 1 FUNNEL VISCOSITY(argp S- CIRCULATE B CONDITION HES 3 RHEOLOGY TEMP FF) e-TRIPPING POLLAROWIRELINE 2 R600R2300 ]-SERVICE RIG R209/R100 0-DOWNTIME RE/R3 B-SLIP/CUTORILLING LINE PV (CP) 10 - WIRELINE SURVEYS YP awl Oo flat 11-LOGGING 01 TER (%Vol) 12-RUN CASINGIOEMENT I Owl Om/39m GELS (WI00M'I 1 13 - WAIT ON CEMENT API FLUID LOSS (ctl30minJ 14 - NIPPLE ON OPMOWN GOP'8 HT1P FLUID LOSS (Cc*K.in) I 15 -TEST BOP'S CAKE APT/HT (1/32') 16-DRILL STEM TEST UNC RET SOLIDS (%Vol) 17. PLUG BACK CORRECTSOLIDS(%Val) 10-SQUEEZECEMENT OIL (%Vop 19 - FISHING UNGORR WATER(%Vol) 20-DIRECTIONAL WORK OZ ATERRATIO 21- MIGCELINNEOUS ALKAL MUD (Ppm) 22 - MEETINGS CL WHOLE MUD (Mil.) 23 - WELL CONTROL SALT(%Wt) 24-COMPLETON F___ 'ME 1 25-COMPLETION(STANDBY) TOTAL 28 EMUL STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND (%Valj RIG FUEL 1,197 5,999 704 5,453 ECD Same) SUPPORT FUEL 8,900 8,900 FLOW IN(gpm) TOTAL FUEL 10,09] 5,000 ]44 16,353 PUMP PRIES g d) RIG WATER 3,514 52 3,562 ROP (FPH) MBT(INbbg HSE pH?EMP SAFETYMEETNGS BEARSIGHTNGS: None Pf/Mf N) 1) 2) OTHERWILDLIFE I None CHLORIDES(mg/L) ACCIDENTS: Nona 3PILLB:' None HARDNESS (Ca++) WEATHER DAILYHIGH 21°F DAILY LOW 12°F CASING 00 NT GRADE MD WO MA%WIND/OIR SW 12 mph MAXWINDCHILL d°F PRECIPITATON None VIale, Y 10.00 mi OOMMENTS BHA DESCRIPTION LENGTHBHA. WT AIR BHA WT. MUD HRS.ON JARS ROT Wi. P.0 Wi S.O WT. TORQUE BIT DATA NO, SIZE MAKE TYPE BERND, NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANf,l DCVI .ITN. I INNER OLTER I ass I am I GAUGE OTHER RP HYDRAULICS DATA PU1MP MAKE MODEL LINER m SPM PSI GPM GPS EFF% ECD 1 "DPP IAV OC BITHHP PUMPHHP 2 PRESSURE PARAMETERS PORE PRESSURE: REDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL R1 TRIP: FORMSTION'. k2 SHOWDEPTHS ROP BeIoreNutlrg aner GAS MUD WT. CHLORIDES REMARKS SURVEYDATA MO ANGLE AZIMUTH TVD NIS COORDINATES EAN V SECTION OLS .11- Wd@ InWrmabon Mana Wmmt LLCer_051315N neFLIT R Q4 VEGUi1M Alkaid Daily Completion Report WELUI ABadpi I CONTRACTOR IAN American Offeld RIG: Rig 111 RPTOATE: 3/6/2019 DRILLING SUPERVISOR I: Pat Slewatl ACTIVItt: CompleteWREPORTNO W.p: 2019A22 API p:50-223.20029-0000 DRILLING SUPERVISOR 2: Lonnie DmRnger LEASE: AOL 391704 9 TOOLPUSHERI: Jae Sterner FIELD: Wbdran TOOLPUSHER 3: Ed Castagne ELEV: RKS: 1].50 3/3119 RIG PHONE N: 90]002-4045 MD:8,595TVG: 0,495 3/10/2019 LASTSHOETESTOATE: SHOETEST: 24 HR FTG HRS GRLG: AFEAMOUNT: AHE CUM. 24HOUR RIHto 8216'wiN 3316"TCP Assembty. RiguPAK-brin,toconelate. Space out end set packBr. Getoflpacker,pickuphargerandiand. RQ up to IA and pressuretest between hanger SUMMARY and P.ekerto1500PSI. Goctltast, RIU Pollard slickline lebroator and pressure test. Line rata tubing and fire guns. ACTIVITY Swab well for Win samples. P ANNED FROMI TO I HRS I OPERATIONS 6:00 1 17:00 11D PIU 2-7I6" H553"33" T1811T 553"33"T1811T 1700 1800 1.0 Service Rig,Blocks. Crow, Drp w rl s, Olean and Clear rig fioor_ Spot up AK-EIIne. 1000 1 19:00 1 1.0 IRIH wIh 2-7R' H533 Fort T/T/8216'. 19:0021:00 20 Rlgup AK-Uns. RlHtotleln, 6'CorreGionuptOE-Yne. Rgtlown AK-Eline, 21:00 23:00 2.0 Lay dML4JBOf2-7e'H553F/8216'T/a003'. 23:00 2:00 3.0 Sat Packer. Top of PLS Packer 0018'. Top Shatat 6082'. Make up Oangerauemblyentl land. Ovamu1110K to verify latcM1. Land M1angerwOhl0konpacker. 2:00 6:00 4.0 IRILDS, RIU to pump dawn IA for packsoftnger test. Notes' 0 Hr Rg Time aespciated w0h PBA ActNky TOTAL HRS 24.0 MORNING UPDATE Pressure tester) IA between Packer and Hangerto 150D PSIfor5 minutes. Good Last. RM Nbdcalar. Fire guns. Positive indication guns fired MUD RECORD MUG 1 Water-Basetl MUD VWAe Baaad OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME 1800 ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOWLINE TEMP ('F) 1-RIGUPMOWN) GREAT BEAR 5 DEPTH"D(it) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGFRrtEMP (M/ga0 9.0 3-REAMING CRUZ 3 SOLIDS (%Voll 4 - CORING ACS 1 FUNNEL VISCOSITY order) 5- CIRCULATE B CONDITION HES 3 RHEOLOGY TEMP CF) 6-TRIPPING POLLARD WIRELINE 2 F60(/R300 E RIG RZOOIR1 50 IME AdIR3 T DRILLING LINE PV (e) INE SURVEYS MLOGGING YP dull OG do NGOIIAVATER(%Vo1 ASING/CEMENT10a1i0m/3gmGELS OW100ho N CEMENT API FLUID LOSS (car30LI n) 14- NIPPLE ON UPIDOWN BOP'S HTHP FW IO LOSS (ccAOmkr) 15-TEST BOP'S CAKE APTMT (1/32') 16 - DRILL STEM TEST UNC RET SOLIDS (%Voll 1]-PLUG BACK CORRECT SOLIDS(%Vop CMT 18-SQUEEZE CEMENT 19-FISHING UNCORR WATER (%Vog 20 - DIRECTIONAL WORK OILANATER RATIO 21-MISCELLANEOUS ALKAL MUD (Pam) 22- MEETINGS CL WHOLE MUD (-w 23 - WELL CONTROL SALT t90W1) 24 -COMPLETION LIME tib/bbD25- COMPLETION (STANDBY) TOTAL 26 EMULSTABILITY CONSUMABLES START RECEIVED USED TOOAVSINV. SAND(%Vo0 RIG FUEL 1,862 685 1,19] ECO (pg)- SUPPORT FUEL 8,900 0,9110 FLOW IN(gpm) TOTAL FUEL 10,782 665 10,09] PUMP PRES (poll RIG WATER 3,640 28 3,614 ROP (FPN) MET gblbbo HSE pH?EMP SAFETYMEETING6 BEAR SIGHTINGS: None PIIMf(0) 1) 2) OTHERWILDLIFE: None CHLORIDES(mgrL) ACCIDENTS: N0n0 SPILLS: None HARDNESS(Ces4) WEATHER DAILYHIGH 20'F OAILYLOW 0•F CA81NG OD INT GRADE MO 1 NG MAX WINOIOIR BW9mph MAX WIND CHILL -IPF PRECIPITATION None VIROILTY i0.CG ml COMMENTS BHA DESCRIPTION LENGTH BHA. N?AIR BHA NR. MUD HRS. ON JARS ROT WT. P.0 WT um TORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANNIVEL) DC(ANNNEL) INTNO I INNER I OUTER1 OLL LOL SB1 SULGE OTTER I IRP! HYDRAULICS DATA PUMP MAKE MODEL LINER ST( SPM PSI GPM GPS EFF% ECD 1 AVDP IAVDC BOHHP PUMPHHP 1 2 PRESSURE PM METERS PORE PRESSURE: REDUCED PUMP RATES BG'. MAX: REMARKS: PUMP SPM PRESS DEPT1 GA9 SKOWS CONN: CL: %1 TRIP: FORMATION: A2 SHOWDEPTHS ROP Be rem,lno Alin 1 GAS MUDWT.. i HLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD N5 COORDINATES ENJ V. SECTION OLS -eeNNen Well@ InMImnten MenegementLLL ver_M1315M fiW& M1� W Alkaid Daily Completion Report PETROLEUM WELL: Almitl#1 CONTRACTOR: All American Caped RIG: Rg 111 RPTDAM:j 315/2019 ALTNITY: Oecomplete SPUODATE: I ORILLINGSUPERVI60R1: Pat Stewart AFE k: 2019A22 I API #:50-223-20029-0000 DFS: DRILLINGSUPERVISOR 2: Lonnie DroNnO,r LEASE: AOL 391704 REPORT NO: 8 TOOLPUSHERI: Joe Steiner FIELD: Wkmat DOL: TOOLPUSHER 2: Ed Castagna ELEV: RNB: 1].50 LASTBOPTEST: 3f3119 RIG PHONE N: 90]-802-4045 MO: 8,595 TVD: 8,405 NEXT BOP TEST: 3/10/2019 LASTSHOETESTDATE: SHOE TEST: 24 HR FTG: NRS ORLG: LSGHD: AFE AMOUNT: .FE CUM. 24HOUR Rig UPAK-E2ne. Pedann CBLRun. Rgdown AK-Eline. RN Fel up One. C10 dentlling equipment Pickup 33rH' TCPAssembly#1. Single in out ofppe shed with 2-7/0'H553. SUMMARY ACTTVlW RIHt0ZG1wh3-3/8"TCPAadmbl, Cimmadewhh AK-Eline. SiR,mok,randreleace. Space out and land hanger. Fn:gund. RN Pollam Swabbing Assembly. Swabwellforfluq PLANNED sample. FROM TO HRS OPERATIONS 8:00 14:00 8.0 R1UAKE-Lina. Pe#Onn CBLF18460'T1439D'. R10AK£In,. 14:00 111911 4.0 Rg up handling equipment JSA with HES completion and pa19oraft comas. PIU and RIH with 3-310'TCF Assembly #I F/Surface T1145'. 10:00 600 120 O7tbdve to RIH with 3-318' TOP Assembly#1Fit 45'Td339', picking up and singing It wild 2-718'65#H553 tram shed Packer set at 1250. Pick up and were able to reload, wed no issue. Packerdet 4 more times between H1 26V T13339'. Picking up to release toque after making up joints has alhviated seeing Issue. Picking up UW DW 23K. Nates: 00:00 -14:00(0 hr) Rig Time associated win PBA AGivity TOTAL HRS 24.0 MORNING UPDATE Runnng in the hole with TCP Run#1 MUD RECORD MUD Water-Based MUD Water-Brsed NAL TIME SUMMARY PERSONNEL ON SITE TIME 1800 ACTIVITY DAILY CUMHRS COMPANY NUMBER FLOWJNE TEMP ('F) 1-RIG UP/DOWN GREATBEAR 4 DEPTH/ND OD 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTITEMP(lo/gal) 9.0 3-REAMING CRUZ 3 SOLIDS (%VOD 4 -CORING BHGE 1 FUNNEL VISCOSITY(dlgQ 5- CIRCULATE S CONDITION ACE 1 RHEOLOGY TEMP (•F7 6-TRIPPING HES S R60OR300 I 7-SERVICERIG R200R100 0-DOWNTIME RIt 9 - SLIP/CUT DRILLING LINE eV (cel 10 - WIRELINE SURVEYS YP QN100 HitT1 LOGGING OILWATER (%VoD 1 12 - RUN CASINGICEMENT 10s110m130m GELS go 13 - WAIT ON CEMENT API FLUID LOSS (a(JOmN) 14-NIPPLE ON UP/DOWN BOP'S HTHP FLUID LOSS amid0min) 15-TEST BOP'S CAKE APTIHT (1130 10- DRILL STEM TEST UNC RET SOLIDS (%VQ 1 ] - PLUG BACK CORRECT SOLIDS (1 18 -SQUEEZE CEMENT OIL(%VoD 19-FISHING UNCORR WATER (%Vo) 20 - DIRECTIONAL WORK OILWATER RATIO 21 -MISCELLANEOUS ALKAL MUD (Pam) 22-MEETINGS CL= MUD (mg1L) 23- WELL CONTROL SALT(%W) 24-COMPLETION LIME Obi 25- COMPLETION (STAND" TOTAL 26 EMULSTABILITY CONSUMABLES START RECEIVEDUSED INV. SAND(%VoD RIG FUEL 2,527 885TODAYS 1,862 ECD (pp9) SUPPORT FUEL 8,900 I I 8.9m FLOIN (gpm) TOTAL FUEL 11,12] 665 10,702 PWUMP PRES(ps) RIG WATER9,694 541 3.640 ROP (FPH MBT(INbbD NSE PH/TEMP SAFEWMEETINGS BEAR SIGHTINGS: I None P"(0) F21 I OTHERWILDLIFE: None CHLORIDES(mg/L) ACCIDENTS: None SPILLS: None HARDNESS(Ca++) WEATHER DAILYHIGH 19•FI DAILYLOW 1 4'F L/151NG OO WT GRADE MD TVD MAXW1N[JgGR I BE]mph MAX WIND CHILL-WF PRECIPITATION I No VISISILTY 10.00 mI COMMENTS BHA DESCRIPTION LENGTH BHA. VJT AIR BHA WT. MUD HRS. ONJARE RCT WT. IPD VNT 6.0 WT ITORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES I RR IN OUT FEET HRS WOB RPM ROP DP(ANNNEL) DC(ANN.NEL) BITNe. INNER OUTER DULL I LOC SE41 GAUGE OTHER I RP HYDRAULICS DATA ",ftf PUMP MAKE MODEL LINER I STK I SPM I PSI GPM GPS EFF% ECD AV DP AVD BIT HHP PUMPHHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: REDUCED PUMP RATES BE MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS COMM CL: 41 TRIP: FORMATION'. 02 SHOWDEPTHS ROP BeorWunp Ager GAS MUD WT. CHLORIDES REMARKS SURVEYDATA MO ANGLE AZIMUTH TVD NM COORDINATES ENJ V.SECTION DLS wMv.vre ,el WdlEalnlwmaWn Manamment LLC vw051315N Nf Mt amr Alkaid Daily Completion Report PETROLEUM WELL: AlkaO AI CONTRACTOR: A9 American ORNM RIG: Rig Ill RPT DATE: L4I201B ACTIVITY: Decomplest SPUD DATE: DRILLING SUPERVISOR 1;1 Pat Stewart APE p:2019A22 APIk:50-22320028-mV00 DFS: DRILLING SUPERVISOR I: Lonnie Drplinger LEASE: ADL 391704 REPORT NO: 2 T"1inU HERO Joe Steller FIELD: WAmcat DOL: TOOLPUSHER2: Ed Carni ELEV: RKB: 1].50 LAST ROP TEST: 13/18 RIG PHONE k: 802-0024045 MD:j 0,595 ND: 8,405 NE%T BOP TEST: 3/102019 LASTSHOETESTDATE: SHOE TEST: 24 HR FTG: HRS DRLG: CSGHD: AFE AMOUNT: AFECUM. 24 HOUR SUMMARY Complete ROP Test Break Oman lest equipment Blow down 11 an' Choke lines. Remove losing Wank and BPV. Rig up and circulate out heeze pmtegpn win 9.0 PPG Brine. BOLDS, pull hanger to poor Lay down kill string. ACTIVITY PLANNED COmpiele BOPTest. Remove test blank and BPV. Rignpantl Cn:ulate0elheazepmletl. Pull banger and an thing. Rigup AK-ElineandpMorm CBL. Pickupandmnnwn TCP Mean y. FROM TO HRS OPERATIONS 6:00 11:00 12.0 C,minuetesling ROPE.TeM2-210'testjpnton AnnUlar.Upper Ppe RaMs,CbOkeMeolbN, Choke Line Valves, KN Lina VBNes, and Floor Valves to 250 PSI Law, 3000 Hgh. P¢dmm Accumumoorarawpran Test Test witness by AOGCC PeVOIeum Inspector Austin McLeod. 11:00 14:00 3.0 Rgdown Test Equpment. Bbwdoweelokeansaft ti. PUIlblankng plug and RPV. 14:00 12:00 3.0 RiBUPantl oroulfreeaeprolectionhom lAto Tubng SMeunN Clean brine to Surface. Lne up tp pump down tubing taking returns up W. Coolant, out heeae from well. 12:001900 2.0 Makeup landing joint. GOLDS, Pull Clanger to rig floor. UW/18K.1909 20'.00 1.0 Break out banger, Lay down Landing joint and M1anger. R¢move Lendln Joint horn M1an B geq seatl M1anger oXlo Norlllam Solulons. 20:00 23:00 10 Rlguppower Bsand handing equipment. Problems ngglnO UP new power tongs. 2300 600 TO Laytlown 4-1/2d-1I2IBT k0 slang. Pmbbms wXhekvetors backing out retaining Plate bolls, replace bOXs. Notes' 0600 06W (24 br) Rlg Tyne ae5ociated Wh PBAAOWy All @sls w0nesse0 by AOGCC Petroleum Inspector Austim McLeod OA Pmssure @1800M1rs -200 PSt TOTAL HRS 31.0 MORNING UPDATE Rigging up AK-Eline wirelne. MURECORD MUD1 WatervBasetl MUD 2 Water -Based OPERATIONAL TIME SUMMARY PERSONNELONSITE TIMED CTIVITY DAILY CUMHRS COMPANY NUMBER FLOWLINE TEMP CF) UPIDOWN GREATBE4R 4 OEPTHRVD(a) LLING ALL AMERICAN OILFIELD 14 MUD WEIGHT(TEMP(forgal) MING CRUZ 3 SOLIDS (%V¢g ING BHGE 1 FUNNEL VISCOSITY pwgg ULATE O CONDITION ACS i RHEOLOGYTEMP rF) PING AK-EUNE 2 MSURVM R600R30a VICE RIG R20gIR10B NTIME RB/R3 SLIP/CUT DRILLING LINE PV (up) ELINE SURVEYSYP(M1100let GGING OILWATER(%Vo0 12 -RUN CASING/CEMENT 1000M30m GELS (IIVI none 13 - WAR ON CEMENT API FLUID LOSS (oaOOmin) 14 -NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOSS (CoOmain) 15 TEST POP'S CAKE APTMT (1132') 16 - DRILL STEM LEST UNC RET SOLIDS(%V00 12 -PLUG BACK CORRECT SOLIDS(%Vo) 18 -SQUEEZE CEMENT AL (%V0Q 19- FISHING UMK WATER (%Vol) 20 -DIRECTIONAL WORK OTER RATIO 21 - MCCELUNEOUS ALKAL MUD (Porn) 22- MEETINGS CL WHOLE MUD (mgh) 23 - WELL CONTROL SALT (%W) 24 - COMPLETION LIME(Iblbbl) 25- COMPLETION (STANDBY) TOTAL 25 E;% STA CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%V0, RIG FUEL 3,192 685 2,521 ECD (ppg) SUPPORT FUEL 8,90018,900 FLOW IN (ppm) TOTALFUEL 12,092 665 11.422 PUMP PRE. final RIG WATER 3,286 102 3,694 ROP (FPM MET(IWbbfj NSE pH(TEMP SAFET'MEETINGS BEARSIGHTINGS: None Pf1Mf(0) 1J 2) OTHER WILDLIFE: None CHLORIDES(mglL) pCCIDENTB: None SPILLS: None it HARDNESS(Cdaa) WEATHER DAILY HIGH I 24-F IDAILYLOW 1 -3'F CASING OO WT GRADE NO ND MA%WINDIOIR E6mpM1 MAX WIND CHILL -15•F PRECIPITATION None VISIBILTY 10.00 m1 COMMENTS BHA DESCRIPTION LENGTHBHA. WIT AIR BHA a'.. an, HRB. ON JARS ROT WT. P.0 WT S.O WT. TORQUE 81T DATA NO. SIZE MAKE TYPE SERNO. NOZZLES RR IN OUT FEET I HRS I WOB I RPIMI ROP pP(ANNNEL) pC(ANN.NEL) BIT NO. INNER CUTER BULL LCC am I RP HYCRAUUCS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECO AVOP AVO BIT HHP PUMP HHP f 2 PRESSUREPARAMETERS I POREPRESSURE:1 IREDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: #i TRIP: FORMATION: 12 SHOWDEPTHS ROP BNbrAurinO Aar I GAS MUD WT. I CHLORIDES REMARKS SURVEY DATA MD ANGLE AZIMUTH ND NIS COORDINATES m V SECTION DLS wuvvellaz.nH WeIIEZ IMarmabon Mare meM LLC v,051315V N(�l141m Alkaid Daily Completion Report PETROLEUM WELL:1 All 01 CONTRACTOR: All A.erhan Cited RIG: R®111 RPTDATE: 3/32019 AClb DecompUw SPUD DATE: DRILIJNGSUPERVISOR1: Pat Stewart AFE•: 2019-22 API N: 50223-20024011-DO DFS: DRILLING SUPERVISOR 2: Lonnie Orollinger LEASE: AOL 391704 REPORTNO: 6 TOOLPUSHERI: Joe all FIELD: Will DOL: TOOLPUSHER2: Ed Castagna ELEV: !RK 17.50 LAST BOP TEST: 3-/19 RIG PHONE M: 907-602-4045 MD: 6695 ND: 8,485 NE%T BOP TEST: 3/102019 LASTSHOE TEST DATE: SHOE TEST: 34 HR FTG: HR90RLG: CSGHD: AFEAMOUNT: AFECUM. 24 HOUR Nipple up BOPS and Accumulalorlines. Nipple up choke and kN lines antl valvas.R@upUtestBOPs. Test BOPx t0250PSILpw, 3000 P31 HghforS manures. 4.112 Test Joint on SUMMARY Annular Prevenar. 2-7/8" Test joint on Annular Preventer and 2-718 Rams. ACTIVITY Complete BOP Test Remove test blank and BPV. Rig up and circulate out freeze prided. PUN banger and kU string, PLANNED assembly. Up UP AK- Epneand perform CBL Pick up and run In with TCP FROM TO HRS OPERATIONS 600 18:00 120 Flange up BOPS. Install kip line,valves, and target T. Install Choke hose,valves, and target T. Rg up accumulator lines. Change fill on BOP. tommalig Mes.6et Pilcher nipple t0 flow box Bet 3 cf 580U BBL sperm si tank farm wN Cru2suppon crew. 1800 2:00 8.0 RIp uP4-tl2"Testjoint and bMnkirg plug adapter. Steep Ust BOPS. Problems wpb flanges leaking. Tightericalw. Ohara dimmer out oford. SouriecimArecoNerend to Me Fig. 200 8:00 4.0 Test 4-12' on Annular Prevmlertu 250 PSI Low, 2500 PSI Hgh.Testbfnd rams, Choke valves 8,10,12, and KHI line isolation valvetc250 PSIlownOOOPSIhmh. Inspection. Secure BOP Slack. Test H25AEL alarms TedwMessby AOGCCPetmleuminspedor Aus(n McLeod. Rg down 4-112" Test joint Rigup2419'Testlant. Notes' 06:00-08:00(24h0 associated wpb PSA Ailson -Time AI USU wpnessed by AOGCC Petroleum d Inzpeorqudin McLeod. OA Pressure ®180(hrs-325 PSI. TOTALHRS 24.0 MORNING UPDATE Raging up 2-768 Test Joint MUDRECORD I WO W.Wr-Does,11 MUD Wd.r,g.sed OPERAITIONALTIMESUMMARY PERSONNEL ON SITE TIME ACTIVITY pAILY CUM HRS COMPANYNUMBER FLOWLINETEMP(°F) 1-RIG UPIDOWN GREAT BEAR 4 pEPTH7NO 8) 2-GRILLING ALLAMERICANOILFIELD 14 MOD WEIGHMEMP (IWgap 3 - REAMING CRUZ 3 SOLIDS (%Vol) 4 - CORING BHGE FUNNEL VISCOSITY (s/qU 5-CIRCULATE 8O0NDITION ACS 1 RHEOLOGY TEMP CF) 6 -TRIPPING AOGCO 1 RBOORi300 7-SERVICE RIG R200R100 8-DOWNTIME Fri 9- SLIP/CUT DRILLING LINE PV (cP) 10 - WIRELINE SURVEYS YP 861100 flet 11-LOGGING OIUWATER (%VOQ 12 -RUN CASINGICEMENT 1OV10hV 30m GELS gist 006e 13 - WAIT ON CEME W API FLUID LOSS (W30min) 14-NIPPLE ON UPMOWN BOP'S HTHP FLUID LOSS (cu30mo1) 15- TEST BOP'S CAKE APT/HT(1/32') 16 DRILL STEM TEST UNC RET SOLIDS (%Vol) 17 - PLUG BACK CORRECT SOLIDS(%VoQ 18-SQUEEZE CEMENT OIL (%VoQ 19 - FISHING UNCORR WATER (%VoQ 20 - DIRECTIONAL WORK OILIWATER RATIO 21- MISOELIANBOILS ALKAL MUD (Pond, 22-MEETINGS CL WHOLE MUD (bri 23- WELL CONTROL SALT O9WI) 24 -COMPLETION LIME(Ib/bbQ 25- COMPLETION (STANDBY) TOTAL 24 Bill STABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND(%VoQ RIG FUEL 3,724 532 31192 ECD (ppg) SUPPORT FUEL 8,900 8.900 FLOW IN dm) TOTALFUEL 12,624 532 12,092 PUMP PRIES (p.p RIG WATER 3,796 ROP( MBT(IWbbQ HSE pHrTEMP SAFETYMEETING6 BEAR SIGHTINGS: None Fowl 1) 1 1 2) 1 OTHER WILDLIFE: None CHLORIDES (ml ACCIDENTS: I None SPILLS: I None TARDINESS (C... WEATHER DAILYHIGH 16 °F DAILYLOW -2°F CASING 00 WT GRADE NO ND MA%WINO/OIR SW 22 mph IND CHILL -2°F PRECIPITATION None VI6IBILTY 10.00.1 COMMENTS BHA DESCRIPTION LENGTH BHA.YNAIR BHAWT. MUD INKb..IARS ROT WT. EUV? 5O WT. TORQUE BIT DATA NO. 1 SIZE MAKE TYPE SER NO, NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANNNEL) DC(ANNNEL) I IBITNO.1 I INNER I IRER DULL I LOC SEAL GAUGE OTHER I IRPI HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD I AVDP AVDCj BITHHP PUMP HHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: ftEOVCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN' CL #1 TRIP: FORMATION: N3 SHOWDEPTHS ROPBNorWDunnv ALeF GAS MUDWT. CHLORIDES REMARKS SURVEVDATA MD ANGLE AZIMUTH TVD N5 COORDINATES DAN V. SECTION OLE xxw.Wla.net Wena lmurtwlbn Menagemenl LLC vx_051915N W1 Ot EG1M AIL Alkaid Daily Completion Report WELL: glhaHY1 CONTRACTOR: gllAmencan Oil6eM RIG: Rg 111 RPT DATE: 3Ylf1019 gCTIVITY: Decampkte SPUD DgTE: GRILLING 9UPERVLROR I: Pet Stewed APE N:201 QU12 1 APIN: DFS: DRILLING SUPERVI6OR Y. Lonnie DrollNger LEABE: REPORT NO: 5 TOOLPUSHERI: Jae Steiner FIELD: DOL TOOLPUSHER 2: Ed Castagna REV: RKB: LAST BOP TEST: RIGPHONE0! MD: ND: NENT BOP TEST: LAST SHOETESTDATE: SHOE TEST: 24 HR FTG: HRSDRLG: CSGHD: ME AMOUNT: AFECUM. Remove VRplugs.d WGA. Remove BPV ham hanger. Venfymledivhymm'-5I6'z10-314"OA. Pressure lest casin through OA to 4500 PSI for 30 MlnNes,monitor spool 11"Gpressure on HOUR ��pingbbe me, verifying OA and tubing communbatlpn. Instal BPV. Nipple dawn dry hole tree. Instafl adapters m SUMMARY ROPE. Func0on test accumulator unit. Fill 10KtankwM diesel. Mot Fee Lyndentankstomeymc. Load 250 J1s 2-7/8' H553. ybpto 11. 5M. Install cellar grating. Stack up ACTIVITY MppHup ROPE. Test BOPS. Put KIIISVing. PLANNED FROM TO NRS OPERATIONS 6'.00 12:00 6.0 Install lubricators, ampule out VR plugs from OA and IA. Lubricate Out BPV 1T a 1 1600 1 40 Rig up to CA, Pump dieseltlown Go, 0.25 BPM, Observe 650 PSI breakdown, FCP 625 PSI, Bring pump rale tot BPMT50 PSI FL P. Pump2BBL away. 1800 1 16:00 1 2.0 Rig up to A, monitoring pressure on Tubing side with guage. Pressure test calm, to 4500 PSI for 30 Minutes. Observe tubing pressure at 4500 PSI, confirming communication between W and Tubing. Rig down testing egmpmen . 18:00 1 800 12.0 11nstall BPV. Nipple down dry bole free. Stack up DOPE. Function fest accumuwt.r unk. rT-TA_HRS 24.0 MORNING UPDATE IFI.nging BOPE MUD RECORD MUO1Wata,Based MUO2Watel-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME ACTIVITY DAILY CUMHRB COMPANY NUMBER FLOWLINE TEMP 1-RIG UPMOWN GREAT BEAR T DEPTWNC(to 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTaEMP(IhI 3-REAMING CRUZ 3 SOLIDS (%Vop 4 - CORING BHGE 1 FUNNELVISCOSITYQVI S CIRCULATE&CONDITION GDR 1 RHEOLOGY TEMP (°F) e-TRIPPING R600IR300 T- SERVICE RIG R2091R100 8-DOWNTIME RBR3 9 - SLIPICUT DRILLING LINE PV (c) 10- WIRELINE SURVEYS YP QN1 O0fl 11 LOGGING OIIaWATEF (%VoI) 4 -RUN CASINGIOEMENT IDs110m130m GELS (WI0011n 13 - WAIT ON CEMENT API FLUID LOSS poa,30min) 14-NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOBS (cN]Omm) 15 - TEST BOP'S LAKE APTMTT 32') 16-DRILL STEM TEST UNC RET SOLIDS (%VOID 1 17- PLUG BACK CORRECT SOLIDS(%Vog 18-SQUEEZE CEMENT 0 L (%V.1) 19-FISHING UNCORR WATER(%Vol) 20 DIRECTIONAL WORK OIfAVATER RATIO 21 - MISCELIANEOUS ALKAL MUD (Pa.) 22- MEETINGS WHOLE MO (mglL) 23 - WELL CONTROL (%Wq 2b COMPLETION (rorob0 25-COMPLETION (STANDBY TOTAL 21 STABILITY CONSUMABLES START RECEIVED USED TOOAVS INV. (%V0, RIG FUEL ng) CAMPFUEL IN Opm) SUPPORTFUEL FRES (Pap TOTAL FUEL FPH) POTWATER INbbq HSEMP SAFETYMEETINGS BEAR SIGHTINGS: None 0) N 1) 2) OTHERWILDLIFE: NoeRIDES(mg&) ACCIDENTS: None SPILLS: NoneNESS(Cett) WEATHER DAILYHIGH 15-F DAILY LOW -1°F LASING OD WT GRADE MD ND MM WHIM E15 mpM1 MAX WINO CHILL -19°F PRECIPITATION None VIBIBILTY 10.00 mi COMMENTS BHA DESCRIPTION LENGTH - BHA. WTAIR BHAWT.MUD HRS. ON JARS ROT WT. PUWT 8.0 WT. ITORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES I RR IN OUT FEET HRS WOB RPM ROP OP(ANNNEL) DL(ANNNEQ BRNO INNER OUTER DULL LCL SEPL GAUGE OTXER ftP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD AVDP AVDC BIT HHP PUMP HHP 1 I 2 PRESSURE PARAMETERS I PORE PRESSUREd REDUCED PUMP RATES GAS BG: MAX; REMARKS: PUMP SPM PRESS DEPTH SHOWS CONN: CL: C1 TRIP: FORMATION: %Z SHOWCEPTHS ROP BeI fing Mer GAS MUD WT. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD NIS COORDINATES EAN V. SECTION OLS xvw.Ml¢.nel WOO InMmaSon ManaPmm LLC -1051315d 1.1f ml2 6mr PETROLEUM Alkaid Daily Completion Report WELL: AIkaMRi CONTRACTOR: All Amencen Cited RIG: Rig 111 RPT DATE: 3112018 1 ACTNITY: Decampata SPUD DATE: DRILLING SUPERVISOR I: Pel Gtewart AFE M: 2019A22 API p: DFS: DRILLING SUPERVISOR 2: tonne Droli LEASE: REPORT NO: 4 TOOLPUSHER I: Jae Steiner FIELD: DOL: TOOLPUSHER2: Ed Castagna ELEV IRKB. 1 LAST BOP TEST: RIG PHONE k: M0: TVG: NEXT BOP TEST. LAST SHOE TEST DATE:SHOE TEST: 24 HR FTG: HRS Di CSGHD: APE MOUNT,AFECUM. 24HOUR Install met caps on rig modules. Scope tlemck up. Pressure testwellhead. Cut cellar box foraccass antl..Wte to facgOele VR plug removal. Mabilted BHGE lubncatorto bcation. SUMMARY Mobilize manifold fortank fano. MON1ze IDU BBL gowbacklenk to location. Set 10K Fuel tank and been In. ACS Spill Response enex on location and set. Rig up lubricator for VR plug el. ACTIVITY Fiti10KTank. Sat Immune for lank farm and begin PLANNED setting tanks.NO Tree. NN BOPS. Rig up Comms an location. Load pits will 90 PPG BrineLoadpio,Oid with 2-741'wmkstdng. FROMI TO HRS I OPERATIONS 600 600 120 Install ref caps on rg modules. Scope derrick up. Pressure testwell head Cut cutler boxlo,access and excavate to facilitate VR plug removal. MoblizeIBHGE Iubriratorto bca0on. MPMI'¢emaad0kltp,lnkfaml. Mi100 BBL Oowhaok tank Wlocation. Set10KFueltankand berm in. AOS SpH Response canes on location sari Rguplubncator. Notes' AM Amencan Rig 111 acceptance 1800 Hrs. DNR Informal VkX 1000 Hrs. TOTAL HRS 12.0 MORNING UPDATE Rigging up lubnoetorlo remove VR Plugs. 225 BBL 9.0 PPG Brine galling inked fordelivery in Ne AM. MUD RECORD MUD Wale,-Based MUD 2 Water-Based OPERATIONAL TIME SUMMARY PERSONNELONSITE TIME ACTIVITY GAILY CUM HRB COMPANY NUMBER FLOWLNE TEMP ('F) 1-RIG UPIDOWN GREATBEAR 2 DEFTHNVO(g) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTNEMP (Ibgap 3-REAMING CRUZ 3 SOLIDS (%Val) 4-CORING BHGE 1 FUNNELVISCOSITY(Vul) 5- CIRCULATE 6 CONDITION GBR 1 RHEOLOGYTEMP CF) 6-TRIPPING RBOOR30D T- SERVICE RIG R20GR100 8-DOWNTIME Ri 9 - SLIP/CUT DRILLING LINE PV Kp) 10- WIRELINE SURVEYS YF Owl co fid 11- LOGGING OILIWATER (%VoD 12- RUN CASING/CEMENT 1 MAN Wastai GELS (Mll001 13 - WAIT ON CEMENT API FLUID LOSS (cc=min) 14 - NIPPLE ON UPOOWN BOP'S HTHP FLUID LOSS ece0 b) 15-TEST BOP'S CAKE APT/HT (1 a2') 18 - DRILL STEM TEST UNC RET SOLIDS (%Vog 17 -PLUG BACK CORRECT SOLIDS(%Vol) 18-SQUEEZE CEMENT OIL (%Voti 19- FISHING UNCORR WATER(%Vol) 20-DIRECTIONAL WORK OILWATER RATIO 21- MISCELLANEOUS ALKAL MUD (Pam) 22 - MEETINGS CL WHOLE MUD 111 23 - WELL CONTROL SALT(%W1) 24-COMPLETION LIME XVi 25- COMPLETION (STAND" TOTAL 21 EMULSTABILNY CONSUMABLES START RECEIVED USED TODAYS INV. SAND (%Vol) RIG FUEL ECO (p,) CAMP FUEL FLOW IN(gpm) SUPPORTFUEL PUMP FREE (pi) TOTALFUEL ROP (FPH) POT WATER MST(Ibbbl) HSE pili SAFETY MEETINGS BEARSIGHTINGS: None PVMf(0) 11 2) OTHER WILDLIFE 1None CHLORIDES M,i ACCIDENTS:None SPILLS: None HARDNESS(Ceey WEATHER DAILY HIGH 154E DAILYLOW -1'F CASING OD WT GRADE NO TVD MAXWNDOIR E15 mph MAX WIND CHILL I -19-F PRECIPITATION None IVISIBILW 1 10.00 m1 COMMENTS BHA DESCRIPTION LENGTH BH,.WTAIR BHA WT. MUD HRS.ON JARS ROT WT. P.UWT So WIN ITORQUE BIT DATA NO, SIZE MAKE TYPE BERNO_ NOZZLES RR IN OUT FEET HRS WOB RPM ROP DP(ANN.NEL) DC(ANNNEL) BbrN.j I INNER I I IXRER I DULL LOC I GAUGE OTTER RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% ECD I AVDP AVDC RRHHP PUMP HHP t 2 PRESSURE PARAMETERS PORE PRESSURE IREDUCED PUMP RATES SG: MAX: REMARKS'. PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: N1 TRIP: FORMATION: # SHOWDEPTHS ROP Mor Ndng PTmr GAS MUD WT. CHLORIDES REMARKS SURVEY DATA MO ANGLE AZIMUTH TVD WS COORDINATES EVV V. SECTION IDLE —.x —net W61& Inkrmznan Managemenruc 1. IISIM510 lAf i t &Ar IL PETROLEUM Alkaid Daily Completion Report WELL: Alkekl#1 CONTRACTOR: All American OigNtl RIG: Rg 111 RPT DATE 22 ACTIVITY: Rig Up SPUD DATE: DRILLING SUPERVISOR t: Pat Stewart AFEM 2019A22 API#: DFS: DRILLING SUPERVISOR 2: L.mda Bolinger LEASE: REPORT NO: 3 TOOLPUSHERI: Jr. Starker FIELD: DOL: TOOLPUSHEII Ed Castagne ELEV: RKB: LAST BOP TEST: RIG PHONE #; MD: ND: NEXT BOP TEST: LAST SHOE TEST DATE: SHOETEST: 24 HR FTG: HRS DRLG: I CSGHD: I AFEAMOUNT: AFE CVM. 24HOUR SM upper utility modules, cutings hos, p6 modules, and pipe shed. Congress to plumb steam smund the D. Thaw out cewr bog prepare for well work. SUMMARY Set IOKTank. MIand set ACS spill conex Mland set 100 BBL tank for swabbing operations. Sat hemulmwM ACTIVITY e far tank farm Motion¢ eer her cellar machinations for lubncalor PLANNED andcellargra4agfF. BHGEbeglnweRmmJwalk. WDTmc. NNBOPs. FROM I TO I HIS OPERATIONS 600 1 690 1 24.0 Ssi.pperwi6lymodules,cuhings box,p0hadules, andpipesbed Commus to plumb steam around the ng. Thawoutaellarbox, prepare for well work. Notes: containment finers on site BHGE bend mpbifvatl AOGCC BOP Test notification sent 2l2TY2D10 at 2023 hrs TOTAL HRS 24.0 MORNING UPDATE Continuing mrig up, preparing cellarmrwelplead work. MUDRECORD MUD Waa-Baccoll MUD Water-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME ACTIVITY DAILY CUM HRS COMPANY NUMBER FLOWLNE TEMP ('F) 1-RIG UPMOWN GREAT BEAR 2 DEPTUND(g) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTITEMP Oblgaf) 1 3 - REAMING CRUZ 3 SOLIDS (%Vol) 4-CORING SHOE I FUNNEL VISCOSITY (slgp 5- CIRCULATE 8 CONDITION RHEOLOGY TEMP ('F) 6 -TRIPPING R111IR3007 - SERVILE RIG .2 Crt3106 0-DOWNTIME RBIR3 9-SLIPICUT DRILLING LINE PV (up) 111-WIRE IN SURVEYS YP (IhryOD IPI 11- LOGGING OIUWATER(%VoD 12-RUN CASINGICEMENT 1000M30m GELS pe/l DO it" 13 - WAIT ON CEMENT API FLUID LOSS pseGOmin) 14 - NIPPLE ON UPIDOWN BOP'S HTTP FLUID LOSS (ctJ30min) 15 -TEST BOP'S CAKE APTHT (1132') 16-DRILL STEM TEST UNC RET SOLIDS (%VoD 1T-PLUG BACK CORRECT SOLIDS(%Vol) 1a-SQUEEZE CEMENT OIL (%Vol) 19 -FISHING UNCORR WATER (%Vop 55 - DIRECTIONAL WORK OIIANATER RATIO 21-MISCELLANEOUS ALNAL MUD (Foo) 22-MEETINGS CL WHOLE MUD (mgY) 23 - WELL CONTROL SALT(%WU 24-COMPLETION LIME(bldbO 25- COMPLETION (STANDBY) I I TOTAL 20 EMULSTABILITY CONSUMABLES START RECEIVED USED TODAYS INV. SAND (%Vd) RIG FUEL ECD (ppg) CAMP FUEL FLOW IN(gpm) OUPPORTFUEL PUMP PRES (mit TOTAL FUEL ROP (FPH) POT WATER MBTdIVbbI) HSE pKITEMP SAFETYMEETINGS BEAR SIGHTINGS: None Puml 1) 1 2)OTHERWILDLIFE None CHLORIDES(mg&) ACCIDENTS: None SPILLS: None HARDNESS(Caaa) I WEATHER DAILYHIGH 12°F DAILYLOW -1°F CA6WG OO WT GRADE MD ND MAXWINDMIR E6mpb MAX WINO CHILL -11°F PRECIPITATION None VISIBILTY LIaSr COMMENTS BHA DESCRIPTION LENGTH BHA, WTAIR BHA WT. MUD HRS.ON JARS ROT WT. P.0 bVT S.O WT. TORQUE BIT DATA NO. SIZE MAKE TYPE I SER NO. NOZZLES RR IN OUT FEET HRS W05 RPM ROP DP(ANN.NEL) DCIANN NEL) BITNO INNER OUTER GULL LOC SEPL GAUGE OTHER RP HYDRAULICS DATA PUMP MAKE MODEL LINER GTR GPM PGI GPM GPS EFF% ECD 1 AVDP !AVOCI BITHHP PUMP HHP 1 2 PRESSURE PARAMETERS POREPRESSURE: REDUCED PUMP RATES SG: MAX: REWRKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN: CL: #1 TRIP: FORMAflON #2 II SHOWDEPTHS ROP BeIarelend, A r GAS MUDWT. CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH w0 NIS COORDINATES ENV V. SECTION DLS aeHeP net Wella lnlwm ton Manapemenl LLC er 051315M ►&mtWr PETROLEUM Alkaid Daily Completion Report WELL: AkaW%1 1 CONTRACTOR:ARAmencan Cited! RIG: Rig 111 RPT DATE: 212]2019 ACTMITY: Rig Up SPUD GATE: DRILLING SUPERVWORI:j Pat Stewart AFE0,2619A22 I API MI DFS: DRILLING SUPERVISOR 2: Laurie Drclinger LEASE: REPORTNO: 2 TOOLPUSHERI: Joe Stelnar FIELD: DOL T00LPUSHER2: Ed Oastagne ELEV: RKB: LAST BOP TEST: RIG PHONE Y: MD: ND: NEXT BOP TEST: IASTSHOETESTDATE: SHOE TEST: 24 HR ITS: HRS DRLG: I CSGHD:j AFEAMOUNT:1 AFECUM. 24 H0UR Set WRs, module. Raise derrick. Boers on, circulating steam around the dg. Complete be pad eWensbns. SUMMARY ACTIVITY new dnllNg line spool mg.SetlOkTanh. Tbawuellarboxculandpumpoi Bring load of 9.0 PPG Brineand bad MomudpAS Brngbadof Welouttothe U2. Mobil3eworkstRngto PLANNED Iocallonandbadinlotbepipesned. FROM TO HRS OPERATIONS 600 6:00 24D SetnlRymodule. Donned a0 utlNes in ng. Fire up bolbr systems and choose, steam through the rig. Rais,d,lnck. Unable to scope derrick due to fm2en drill line spool. Wont on thawing out drilling line spool. Notes'. BOP adapter spool on location. BHGE representative mobilos d from Kana]. Site vat from HES Free crew representative, vented frac spread MI on pad, T0TA-HR5 24.0 MORNING UPDATE Continuing to lig up. Puts are ready fare lead of Batu. MUDRECORD IMUDi WaterEased MUD Water-Based I OPERATIONAL TIME SUMMARY PERSONNELONSITE TIME ACTIVITY DAILY CUM HRS COMPANY NUMBER FL0W4.INE TEMP ff) t-RIG UPIDOWN GREATBEAR 2 DEPTHRVD(fl) 2-DRILLING ALL AMERICAN OILFIELD 14 MUD WEIGHTREMP (6/gall 3 - REAMING CRUZ 3 SOLIDS (%Val) 4 - CORING FUNNEL VISCOSITY (slop 5 -CIRCULATE S CONDITION RHEOLOGY TEMP (-F) 6 -TRIPPING R600IR300 T- SERVICE RIG R2001RIGO 6-DOWNTIME RSIR3 9-SLIPICUT DRILLING LINE PV bP) 10- WIRELINE SURVEYS YP(IIH100tle 11-LOGGING OILNJATER (%Vap 12 - RUN CASING/CEMENT 1 OsltO W30m GELS (IW100fle 13 - WAIT ON CEMENT API FLU D L0SS (cc409min) 14 -NIPPLE ON UP/DOWN BOP'S Al FLUID LOSS (ccl3Dmin) 15-TESTBOP'S CAKE APTMT (1432') 16- DRILL STEM TEST UNC RETSOLIDS (%Vop 12 - PLUG BACK CORRECT SOLIDS pol 16 - SQUEEZE CEMENT OIL(%Vop 19-FISHING UNCORR WATER (%Vp) 20- DIRECTIONAL WORK 011-WATER RATIO 21-MISCELLANEOUS ALKAL MUD (Pam) 9 22- MEETINGS CL WHOLE MUD (mglU 23- WELL CONTROL SALT (%tM) 24-COMPLETION LIME(bltri 25- COMPLETION (STANDBY) TOTAL 19 EMULSTABILITY CONSUMABLES START RECEIVED USED TODANS INV. SAND (%Vop RIG FUEL E00 (ppp) LAMP FUEL FLOW IN gpm) SUPPORTFUEL PUMP PRES (ps6 TOTAL FUEL ROP (FPH) POT WATER MET(IWbbO HSE pHTEMP SAFETY MEETINGS BEAR SIGHTINGS: None PtIai 1) 2) 1 OTHERWILOLIFE: None CHLORIDES hall ACCIDENTS: None SPILLS: None HARDNESS(Ca++) WEATHER DAILVHIGH 12-F OAILVLOW -3°F OD INT GRADE MD ND MAX WIND/DIR SW Bmpll M4X WINO CHILL -16°F PRECIPITATION None VISIBILTY Cl... COMMENTS BHA MCASWG DESCRIPTION LENGTH BHk W TAIR BHA WT. MUO HR5.Of4 JARS ROT Wrt. P.0 b S.O WT. ITORQUE BRDATA NO, SIZE MAKE TYPE SERNO. NOZZLES RR W OUT FEET HRS WOE RPM ROP DF(ANNNEL) DC(ANR.NEL) BITNO. INNER OVIER DULL LOC SEAL GsuG OTIER RP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS I EFF %I ECD 1 AVDP AVDCj BITHHP PUMPHHP 1 2 PRESSURE PARAMETERS I POREPRESSURE:1 IREDUCED PUMP RATES BG: MAX REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN' CL: #1 TRIP: FORMATION: 12 SHOWDEPTHS ROP 13rorwAnO After GAS MUD WC CHLORIDES REMARKS SURVEYDATA MD ANGLE AZIMUTH TVD NM COORDINATES ENO V_SELTION DLS VMV[WaMez..1 WW&Inb—Wa ManagemenLLLC ver 051315V e�R ot6mr Alkaid Daily Completion Report WELL: AAeM#1 CONTRACTOR:AII American OAfell RIG: Rig Ill RPT DATE:2I26I2019 ACTNITY: Rg Up SPUD DATE: DRILLING SUPERVISOR I: Pat Stewart "99.. 2019A22 qPI M: DFS: DRILLING SUPERVISOR 2: LannM DmIlinger LEASE: REPORT NO: 1 TOOLPUSHERL Joe Steiner FIELD: DOL: T00LPUSHER 2: Ed Castagna ELEV: RKB: LAST BOP TEST: RIG PHONE M: MD: ND: NEXT BOP TEST: LAST SHOE TEST DATE: SHOE TEST: 24 HR FTG: HRS BRING CSGHD: qFE AMOUNT: $1.674835 qFE CUM. 24HOUR So'aerarou000g, Spot and set subbase, M12 remps, and caller. SUMMARY ACTIVITY Mebil¢e pipe shed and renctabg rig components, complete rg9Mg up All American Rg 111. Ice Mand Cumpletepedetdensiuns. SellnerfarlankfamraLd I0kTank Prepammilarfor PLANNER pre-welwark. FROMI TO I HRB I OPERATIONS 6:00 1 6:00 24.0 Set Meron Mnstomforrg. Spot andestsub base and rig floor SetrempsforcanierandsMCarrier. Notes: BOPS moved on IoNdid, Satellite ramp water samples good. TOTAL HRS 24.0 MORNING UPDATE MUD RECORD I MUD Water-Based MUD Water-Based OPERATIONAL TIME SUMMARY PERSONNEL ON SITE TIME ACTIVITY DAILY CUMHRS COMPANY NUMBER E TEMP (°F) 1-RIG UP/DOWN GREAT BEAR Z D SO 2-DRILLING ALLAMERICAN OILFIELD 14 GHTREMP gblgaO 3-REAMING CRUZ 6 Vol) 4. CORINGVISCOSITY ZZEIGHTffEMP (sat) 5 - CIRCULATE & CONDITION GY TEMP ('F) 6-TRIPPING 0 7-SERVICE RIG O 8-DOWNTIME 9-SLIPICUT DRILLING LINE PV Kp) 10 - WIRELINE SURVEYS. YP("100 RR 11-LOGGING 0IL14VATER (%Vpg 12- RUN CASINGR:EMENT 10910"30. GELS 0b'1 Opht" 13 - WAR ON CEMENT API FLUID LOSS O.DOmin) 14 - NIPPLE ON UPIDOWN BOP'S HTHP FLUID LOSS KcGOmn) 15 -TEST BOP'S LAKE APTIHT (tG2') 16-DRILL STEM TEST UNC RET SOLIDS ry6Voq 17- PLUG BACK CORRECT SOLIDS(%Vog 19-SQUEEZE CEMENT OIL (%Vol) 19 - FISHING UNCORR WATER (%Vo0 20 - DIRECTIONAL WORK OIIIWATER RATIO 21-MISCELLANEOUS ALKAL MUD (Pom) 22- MEETINGS CL WHOLE MUD (mglq 23 - WELL CONTROL SALT(%WO 24-COMPLETION LIME(Ib/bbQ 25-COMPLETION(STANDBY) TOTAL 22 EMULSTABILITY CONSUMABLES START RECEIVED USED TODANS INV. SAND (%Val) RIG FUEL ECD (ppg) CAMP FUEL FL0W IN Spm) SUPPORTFUEL PUMP PRES (Aso TOTAL FUEL ROP (FPM POT WATER MET QWbbg HSE pHTEMP SAFETVMEETINGS BEARSIGHTINGS: None Pfmf(0) 1) 2) 0THERWILDLIFE: None CHLORIDES On k) ACCIDENTS: None SPILLS: None HARDNESS(;... I WEATHER DAILY HIGH 11F DAILY LOW -4F CASNG OD WT GRADEgMDWDMAXWINDMIR ESMPH IMAXWINDCHILL I OF PRECIPITATION None VII Clear COMMENTS BHA DESCRIPTION LENGTH BHA. 4NAIR BHA WT. MUD HRB. ON JARS ROT WT. P.0 YVT 18.0 WT. I ITORQUE BIT DATA NO. SIZE MAKE TYPE SER NO. 1 NOMIL RR IN OUT FEET HRS I WOE RPM ROP DP(ANNNEL) OC(ANNNEL) BIT NO. INNER CUTER BULL LCC SFAL I OT1ER I RP HYDRAULICS DATA PUMP MAKE MODEL LINER SM SPM PSI GPM GPS EFF% ECO qV OP AVO BR HHP PUMP HHP 1 2 PRESSURE PARAMETERS PORE PRESSURE: REDUCED PUMP RATES BG: MAX: REMARKS: PUMP SPM PRESS DEPTH GAS SHOWS CONN. CL V1 TRIP: FORMATION: #2 SHOWDEPTHS ROP Bemffiuing AMr GAS MUD W4, CHLORIDES REMARKS SURVEVDATA MD ANGLE AZIMUTH TVD N/B COORDINATES EM/ V. SECTION OLS rww."I.'nl WMIEZInIamaWn M.reg..tLLG ver 051315M HALLISURTON Sales Order# 0905562759 Great Bear Petroleum Operating LLC Alkaid #1 Interval I Upper Brookian Formation Sagavanirktok County, AK API: 50-223-20029 Prepared far: Michael Duncan March 17, 2019 Stimulation Treatment Post Job Report 35# Hybor-G Prepared By: Landon Harrison Chad Burkett Nanook Crew Notice: Although the information contained in this report is basedonsound engineering practices, the copyright owner(s) does (do) not accept any responsibility whatsoever, in negligence or otherwise, for any loss or damage arising from the possession or use of the report whether in terms of correctness or otherwise. The application, therefore, bythe user of this report or any part thereof, is solely at the user's own risk. NALL11SURTON •,.,,., . :. Table of Contents Section Page(s) —---—-------------------- --- Exetutne Summary ------- -------—--- ---- 3 Actual Design 4 Interval5ummary 5 fluid System�Proppant Summary 6 Interval I Plots 7-14 Appendix Is Chemical Summary 16 Planned Design 17 Beal -Time OC IB Wellbore Information 19 Water Straps 20 Field Water Analysis 21 Field Hydratloa Test 22 Lab Testing _ 23-26 Great Bear Petroleum Operating LLC- Alkaid #1 TOC Engineering Executive Summary On March 17, 2019 a stimulation treatment was performed in the Upper Brookian formation on the Alkaid #1 well in Sagavanirktok County, AK. The Alkaid #1 was a 1 stage Vertical Plug and Perf Design. The proposed treatment consisted of. 0 gallons of Fresh Water 0 gallons of Treated Water 8,119 gallons of 30# WaterFrac-G 53,980 gallons of 30# Hybor-G 5,000 pounds of Premium - 100m 14,040 pounds of Premium - 40170w The actual treatment fully completed 0 of 1 stages. 0 stages were skipped, and 1 stages screened out or were otherwise cut short of design. The actual treatment consisted of: 0 gallons of Fresh Water 0 gallons of Treated Water 6,304 gallons of 30# WaterFrac-G 3,866 gallons of 30# Hybor-G 5,000 pounds of Premium - 100m 14,040 pounds of Premium - 40/70w A more detailed description of the actual treatment can be found in the attached reports. The following comments were provided to summarize events and changes to the proposed treatment: After 6 ppg stage hit parts, pressure started to build significantly, customer called for us to cut sand at screws and go to flush. Undert/ushed to leave 6 ppg at parts in wellbore per customer request. Pumped Mini -Frac prior to interval, data suggested that closure happened within minute. Due to the open gas lift check valve, determined closure was likely false due to water hammer effects that were absorbed into the IA then not equalized back to the casing. Due to the extremely low fluid efficiency determined from Mini -frac, HES engineer and customer rep agreed to extend pad based on available water on location and increase gel loading from 30 to 35/b/mgal to mitigate issues with low fluid efficiency. While pumping the pad stage OA pressure started coming up. Tried to bleed it off slowly but pressure was still building. Came offline to setup a pump from the workover rig to pump OA fluid to the rig's slop tank and bleed OA back down to approximately 0 psi. Due to the inability to build pressure on the IA, we had to call max pressure at 4000 psi. Started back into pad stage, primed up screws with a minor amount hitting the tub, which is believed to cause the first drastic increase in pressure. Customer rep called staging on the fly once the previous stage had hit parts and he was comfortable believing pressure was not building. Halliburton is strongly committed to quality control on location. Before and after each job all chemicals, proppants, and fluid volumes are measured to assure the highest level of quality control. Tank fluid analysis, crosslink time, and break tests are performed before each job in order to optimize the performance of the treatment fluids. Determined chemical setpoints from pilot testing with tap water from the Deadhorse lab, then modified the MO -67 (high pH buffer) and SP Breaker setpoints to achieve desired break time. Ran OptiFlo-1/1 instead of OptiFlo-II due to product availability. Had to increase MO -67 setpoint during job due to low crosslink pH. Halliburton maintains a continuous quality improvement process and appreciates any comments or suggestions that you may have. Halliburton again thanks you for the opportunity to perform service work on this well. We hope to be your solutions provider for future projects. Thank you, Landon Harrison Technical Professional Halliburton Energy Services Great Bear Petroleum Operating LLC-Alkaid#1 Executive Summary Great Bear Petroleum Operating LLC - Nlkaid #1 Actual Design ®®mggggi®®mm0mgg®®e ®m®®mm®ggg0lf��=0a ®_®ggg®ggF.f®mmgusa Great Bear Petroleum Operating LLC - Nlkaid #1 Actual Design Alkaid #1- Upper Brookian - Interval 1 Interval Summary Start Date/Time: 3/17/1913:48 End Daterlime: 3/17/1918:03 Pump Time: 255 min Initial Rate (Breakdown): 1.0 bpm Initial Surface Pressure (Breakdown): 1,789 psi Max Rate: 22.8 bpm Max Surface Pressure: 4,155 psi Average Rate: 18.2 bpm Average Missile Pressure: 2,783 psi Average Surface Pressure: 2,802 psi Average Missile HHP: 1,241 this Initial OA Pressure: 15 psi Max OA Pressure: 495 psi Max Proppant Concentration: 6.54 poll Average Visc: 29 CP Average Temp: 84 F Average pH: 8.8 SIP: 695 psi Initial Fracture Gradient: 0.521 psiift Initial 5 min: 643 psi Initial 10 min: 600 psi Initial 15 min: 579 psi SOP : 314 psi Final Fracture Gradient: 0.475 PSM Final s min: 219 psi Final 10 min: 194 psi Final 15 min: 181 psi Proppant Summary Premium -100m Pumped: 5,000 its Premium - 40f7Ow Pumped: 14,040 lbs Wanh - 20/40 Pumped: 57,060 Its Total Proppant Pumped-: 76,100 lbs Proppant in Formation: 76,100 lbs Fluid Summary (by fluid description) Fresh Water Volume: 0 gal 0 bbis Treated Water Volume: 0 gal 0 bbis 15% HCI Volume: 0 gal 0 bbls 30# WaterFraoG Volume: 6,304 gal 150 bbls 30#Hybor-G Volume: 3,866 gal 92 bb/s Freeze Protect Volume: 1,214 gal 29 bb/s Fluid Summary (by stage tlescription) Load Well Volume: 2,163 gal 52 bb/s Pad Volume: 31,154 gal 742 bbis Proppant Laden Fluid Volume: 24,234 gal 577 bbis Flush Volume: 4,141 gal 99 bb/s Mini-Frac Volume: 3,866 gal 92 bible Freeze Protect Volume: 214 gal 5 bbis Flood Surface Lines Volume: 1,000 gal 24 bbis Interval Status: Cul Short Comments: Ran OpliFlo-Ill instead of OptiFlo-II due to product availability. Pumped Mini-Frac poor to interval, Engiosec Landon Harrison data suggested that closure happened within minute. Due to the open gas lift coed valve, Treater Michael Selguem determined closure was likely false due to water hammer effects that were absorbed into the IA then not equalized back to the casing. Due to the extremely law fluid efficiency determined from Supervisor: Chad B.tior e Min Vfmc, HES engineerand customer has agreed to extend pad based on available water on location and increase gel loading from 30 to 351b/mgal to mitigate issues with low fluid efficiency. While pumping the pad stage OA pressure started coming up. Tried to bleed loll but pressure was still building. Came offline to setup a pump from the wprkover rig to pump OA find to the rig's slop tank and bleed OA back down to approximately 0 psi. Due to the inability to bull pressure on the IA, we had to call max pressure at 4000 psi. Started bad into pad stage, primed up screws with a minor amount hkdng the tub, which is believed to cause the first drastic increase in pressure. Customer rep called slaging on Me fly once the previous stage had hit perts and he was comfortable believing pressure was not building. Had to Increase MO -67 setpoint during job due to low orosslink pH. After 6 ppg stage hit parts, pressure started to build significardy; customer called for us to cut sand at screws and go to flush. Underflushed to leave 6 ppg at parts in wellbore oer customer remest. �mbhen tom eoM.e�aulwMpons EeaM an mulpgn ve�ahles, i'.n omurwelgnlecxetvdumn ext mey very cuBAdy from m%number. Customer RepMichael Duncan Great Bear Petroleum Operating LLC -Alkaid#1 ,Interval Summary 5 Great Bear Petroleum Operating LLC - plkaid #1 Fluid SWtem-Pmppant Summary Pressure Test - Treatment? Treating Pressure (psi) Treating Pressure @Pump (psi) W17/2019 - ---- — -- —V Time W17/2019 Global Event Log Intersection TP TPP Intersection TP TPP ® Pressure Test -Global Kickouts 11:53:31 304.5 323.6 ® Pressure Test -Local Kickouts 11:5503 1931 .1846 ® Pressure Test -70% 11:57:14 6319 6339 ® Pressure -Fest -Max 12:01:11 9525 9498 ustomer: GREAT BEAR PErROL91M OPBRATM LLC I .bb Date: 17 -WT -2019 Well Description: Aktal6 #1 LW: 5022320029 Great Bear Petroleum operating LLC - Al kaid #1 Interval l Plots #: 0905562759 1 ""u'u'°" A Treatment Plot -Mini-Frac Treating Pressure (psi) A Slurry Rata (bpm) B - 'gal) C BH Proppant Cone (Ib/gad C Hydrostatic -Pressure (psi) D C Time Custorrer: GREAT BEAR PErROLHJM OP92ATMG LLC Job Date: 1740ar-2019 Sales Order #: 0905562759 Nleli Description: Alkaic #1 UM: 50-22&20029 Great Bear Petroleum Operating LLC-Alkaid k1 Interval l Plot 0.0 13:35 13:40 13:45 13:50 13:55 1400 14:05 V1712019 Time W1712019 Customer: GREAT BEAR P=TROLS-M OPERA NG LLC Job Date: 17 -Mar -2019 Sales Order M 0905562759 Well Description: Alkaid#1 LAM: 50-223-20029 Blender Chemical Plot - Mini -Frac Optiflo-III Conic (Ib/Mgal) B SP Breaker Conic (Ib/Mgal) — B CL 31 Conc (gaitMgal/ A CAT -3 Conc (gal/Mgal) A CL -22 UC Cone (gal/Mgal)— A MO -67 Cone (gal/Mgai) 8 I B 4 91 Great Bear Petroleum Operating LLC-Alkaid p1 Interval l Plots 9 ADP Chemical Plot -Mini -Frac A Losur/--300D Conc (gal/Mgal)— A CLA-Web Conc (gal/Mgal)— C WG -36 Conc (Ib/Mgal) B W17/2019 W1712019 Time Customer: GREAT BEAR PErROLB.M OPERATING LLC Job Date: 17 -Mar -2019 Sales Order M 0905562759 Well Description: Alkaid #1 LW: 50-223-20029 Great Bear Petroleum Operating LLC-Alkaid #1 Interva11 Pleta Treatment Plot - Treatment 1 Slurry Pioppanl Conc (tbtgal)C BH Prpppant Conc (Ib/gal) C. A B Hydrostatic Pressure (psi) D I C D OUstorrer: GREAT BEAR PEIROL&JM OPERATING LLC Job Date: 17 -Mar -2019 Sales Order#:0905562759 Well Description: Alkaid#1 WN: 50-223-20029 I Me Great Bear Petroleum Operating LLC - Alkaid #1 Interval1 Plots 11 Blender Chemical Plot -Treatment 1 Optiflo-III Cone (Ib/Mgal) 6 SP Breaker Cone WIt ge I) - - --- A A CAT -3 Conc (gal/Mga1)A CL -22 UC Conc (gal/MgaI)A B B p"111111r, "'11 T "III 16:20 16:40 17:00 17:20 17:40 1800 W17/2019 Time 3/17/2019 Custorrer: Cd7FAT BEAR PEIROLa N OPERATING LLC Job Date: 17-tMr-2019 Sales Order #: 0905562759 WeII Description: Alkad #1 INN: 50-223-20029 Great Bear Petroleum Operating LLC - Ar ald MI Interval I Plots 12 ADP Chemical Plot -Treatment 1 A I Losurf-300D Conc (gal/Mgal) — A CLA-Web Con c (gal/Mgal) — C WG -36 Conc (Ib1Mga1) B B C 2. 100 4 0. 16:20 16:40 17:00 17:20 17.40 1800 W17/2019 3/17/2019 Time Customer: GREAT BEAR PErROLa1M OPERATN IG LLC I ,bb Cate: 17 -Mar -2019 Sales Order #: 0905562759 Well Description: Alkaid#1 IPM: 50-22&20029 30 30 r0 30 i0 10 l0 0 0 Great Bear Petroleum Operating LLC - Alkaid #1 Interval Plots 13 Net Pressure Plot -Treatment 1 —Net Calc'd BH Pres (psi) A Time NetPr BPC Slope — BH Proppant Conc (lb/gal) B 56.30 1344 5.194 3.253 A Slope of Net. Pressure(psi/min) C Time (min) Customer: GREAT BE4R PEIROLfl1M OPIPATI IG LLC Job Date: 17 -Mar -2019 Sales Order #: 0905562759 Well Description: Alked#1 LAM: 50.22320029 Great Bear Petroleum Operating LLC - Alkaid #1 Interval l Plots HALLIBURTON Sales Order# 0905562759 Great Bear Petroleum Operating LLC Alkaid #1 Interval 1 Upper Brookian Formation Sagavanirktok County, AK API: 50-223-20029 Prepared for: Michael Duncan March 17, 2019 Stimulation Treatment Appendix - Chemical Summary - Planned Design - Real -Time QC - Wellbore Information - Water Straps - Field Water Analysis - Field Hydration Test - Lab Testing 3reat Bear Petroleum Operating LLC- Alkaid #1 Appendix 15 customer Great Bear Petroleum Operating) HALLi9UgT0N Formation Upper Brookian iihm-t Lease Allald#1 API 50-223-20029 Date 3/12/2019 Interval summary- Uemiola Great Bear Petroleum Operating LLC-Alkaid p1 Chemical Summary Liquid AddHiveF D,Additw. Interval LoSurf-3000 CIA -Web MO -67 CL -220C 01-31 CAT -3 LVT-200 WG -36 BE -6 OptiF12-III Opt6lo-ll SP artak¢r (Bol) (Bol) (9e0 (9e0 fuel) (Balt) (golf (lbs) f/W ph') (IbsJ (lbs) Prime Op 1 0 62 0 62 0 104 0 60 0 28 0 61 0 5040 0 2744 2 10 0 61 0 0 0 toB Total 62 62 104 60 28 61 1 5040 2744 12 61 0 108 w/o Prime Up 62 fit 104 60 23 61 1 5040 27" 10 61 0 1 10.4 Great Bear Petroleum Operating LLC-Alkaid p1 Chemical Summary ®� �® m•m0�mmm•mrm®mmR•a �� �� m•®gym®m��®gym®m �� ee ®molmm0�mm�mm ee 0mmmmm�mm��m Great Bear Petroleum Operating LLC- Nlkaid 91 Planned Design m - m��a m ®m��m00®��®mm�mm0�m®�mmm m♦®��®���mmmmm���mm m� m��m 0a0�m®mm�mmm�mml�0mm m��m� �maa®gym®�m�mmmmm��mmm m m� �m•mm� �mm ®a®®m®omm®m�mm�mmm ®®��®mom®®®®�0mmm®m�mmmmmm ® - �®®mmkm•��®mom®mmm®mom®m�0mm m® ®®m ®��0m®mmm�mm�mmm ®� �® m•m0�mmm•mrm®mmR•a �� �� m•®gym®m��®gym®m �� ee ®molmm0�mm�mm ee 0mmmmm�mm��m Great Bear Petroleum Operating LLC- Nlkaid 91 Planned Design FAtl 14 14 1 ��PJ = in] 0 1 M Customer: Great Bear Petroleum Operating LLC Wellname & #: Alkaid #1 Date: Mamh 17, 2019 Interval Stage Vise Linear pH Temp OF XL pH Comments Mini -Frac 19 7.53 73 8.63 Viscosity was low due to LVT-200 in sample. Pad 24 7.25 69 9.20 Working up viscosity from 30# to 35# system. 100m-0.50# 32 7.10 82 9.62 I OOm - 1.00# Missed sample due to QC missing the call that we staged early. 40/70 - 1.00# 34 7.32 84 Missed taking the XL sample to the TCC. I 40/70-2.00# 34 7.56 88 8,43 4070-3.004 1 Missed sample due to QC missing the call that we staged early. Wanli 20/40 - 3.0# 29 7.31 86 8.57 Wanli 20/40 - 4.04 29 7.36 89 8.64 W anti 20/40 - 5.04 29 7.56 90 9.24 W anti 20/40 - 6.04 27 7.39 94 9.45 Great Bear Petroleum Operating LLC-Alhaid #1 Peal-rme QC Customer Great Bear Petroleum operating LLC _ larmonTrya Formation Upper Broolean Avera ge lntnval I "In -"Cu", Pert Lease AlkaiE N1 mlN Sleeve/Pert gal) (-a Btto MDlftl API 50223-20029 Formation Oesnlpmr Tempera lure lF) Ped Mn Preswn Ipsil more 3/17/2019 miametn awo Oastdptlen b ID On( g (gall T (aPf) (in) fp {939 q6:T 0,153 Tubing 1,115 2441 65 1-80 02031 0 e,1Po 1,969 10,57D Cesing ].625 6.875 297 to0 1.9284 8,158 8,360 390 6,g9m Total 8,360 2,359 0.00579 lrtttuna 1.amgnt. a a KOP 0 f[ mp. Gratliant (°%IW ft) 1,37 Avg.ND L. fr aFIT(°f) 171.7 Total MD 8,360 fr Sleeve/pert Depth M ALt.ItIV RTt>ry F Ime mlapietemomm Tep Top Mm pI) Ave ra ge Avera ge lntnval Number of Pelf Gun Pert PM1a sing Pert mlN Sleeve/Pert gal) (-a Btto MDlftl TVD(ft) In[ervalp Formation Oesnlpmr Tempera lure lF) Ped LapgtM1 Iftl De hairy Total sxpts Ideal miametn [meters (aPf) (in) 1 {939 q6:T 0,153 8,158 8,13fi 1 UpperOmoklan 171,7 1 1 1 6 1 6 1 3. 60 ..IF Great Bear Petroleum Operating LLC- Alkaid #1 Wellbore Information Customer: Great Bear Petroleum Operating LLC Well: Alkaid#1 Date: 3/15/2019 Formation: Upper Brookian SO#: 0905562759 Great Bear Petroleum Operating LLC-Alkaid #1 Water Straps General Beginning Strap Ending Strap Tank Type Water Source Inches Gallons Barrels Temperature (*F) Inches Gallons Barrels 1 Atigan Lake 103 19,370 461 110 18 2,898 69 2 Atigan Lake 106 19,950 4 75 108 12 1,806 43 3 Atigan Lake 103 19,362 461 110 17 2,730 65 4 Atigan Lake 103 19,362 461 104 31 5,292 126 Location Summary Starting Volume Ending Volume Total Used Gallons Barrels Gallons Barrels Gallons Barrels 78,044 1,858 12,726 303 65,318 1,555 Pre -Job Barrel Bottoms Zones: Volume Needed for X Intervals (BBL): Number of Tanks Needed: Tank Bottoms (BBL): 1 1,539 3 80 Great Bear Petroleum Operating LLC-Alkaid #1 Water Straps HALLIBURTON Mvvka piN PMM p[ Paepb Wabr 4nalWix en lactlan yr ppm mLL[ Lm Mend: We11Mme� glkaitl plum pau Te 3/1</J019 W+urSnu La Fe Walar pxMc noXM lmn [F ladle SUIMa hkim nealum Beal BeabonbAonater T. Linear Wahr Gel PoALossllnF n6pH mPy 'o.—xllnk em pe aates tl I50� 1 HaNness IN 60 P'1 ICO v' ,Illy r FY c essllnk '6 —A mOL .,L m37L m A meh ep MI T.A. StKP SMp et eII NC tlnexx Th.tI n W. N/p SNp .N 11 Pmbv pmbe probe pmbe - nn aldum 1iow 74030 3LOr0 9.3 3 3Wea 7.3 BOB9A A3 NA 530 SID 2. a24M 21 1.. 9.I ].W6 ]97 ]4 513 0 23 7.2Y Pren a 340r 23 7.0 7A 961 1 Maximum71,1 0SM 340r 33 ].] 7.7 94 MPanm 5006 7.1 16L 0 53 1. 2388 ¢� BJ N 0.3 OS Great Bear Petroleum Operating LLC-Alkaid #1 Field Hydration Test HALLISUATON Alaska District Field QC Prejo6 Hydration Test on Location Company: Great Bear Operating Company Treatments: 1 Well Name: Alkaid #1 Date Tested: 3/14/2019 Water Source: Lake Water Testing Viscosity, p (From FANN-35) Temperature °F (minutes, cp) Tank# Digital 1 2 3 4 5 6 7 8 9 10 Thermometer 1 74.3 10 12 15 18 20 21 21 22 22 23 2 77.9 10 14 17 19 21 22 22 23 23 23 3 79.5 13 15 18 20 21 22 23 23 23 23 4 79.5 11 15 18 21 21 22 23 23 23 23 Average 77.8 11 14 17 20 21 22 22 23 23 23 Maximum 79.5 13 15 18 21 21 22 23 23 23 23 Minimum 74.3 10 12 15 18 20 21 21 22 22 23 Range 5.2 3 3 3 3 1 1 2 1 1 C Great Bear Petroleum Operating LLC-Alkaid #1 Field Hydration Test HALLIBURTON Prudhoe Bay Field Laboratory - Rockies NWA Laboratory Project ID Number: 2066924 Customer: Great Bear Well Name & Number: Alkaid 1 Fluid System: Hybor G Date: March 13, 2019 0 minutes at 511 1/see 10 minutes the shear rate was decreased to 100 1/sec water. Technician(s) Performing Testing: Jason Doyle Reviewed & Approved By: ]mer. Great Bear Fluid System: HyborG Bob Type: B5 Name: Alkaid 1 Water Source: Tap Shear Rate (1/sec): 5111100 March 13, 2019 BHST ("F): 105 Lab Project ID: 2066924 WG -36 1 1 2 1 3 0.15 0.15 0.15 1.00 1.00 1.00 30.00 30.00 300 1.00 1.00 1.00 0.25 0.25 0.25 0.90 0.90 0.90 0.45 0.45 0.45 1.00 1.00 Base Gel Vise (cP) 24.0 Base Gel pH 8.21 Base Gel Temp. (OF) 75 Buffered pH Po00 Crosslink pH 10.17 Final pH 9.72 Test Temp. (°F) 105 Break Time (Immo n) N/A under 50cp in 0:45hrs, Fluid 4 dropped under 50cp in 1:361rs, 13.0 250 22.0 23.0 75 ...... ^^Shear Rate —Viscosity .......... Shear Rate Viscusity ^... ��.^Shear Rate —Viscosity .­­­ Shear Rate —Viscosity ^^...... Shear Rate —Viscosity -—^ shear Rate —Viscosity —_— Temperature — —— Temperature — —— Temperature — —— Temperature — —— Temperature — —— Temperature 1200 -- -- 120 —`-- 100 „ 800 as r 600 y 400 200 0 0:00 so so 40 20 0 0:28 0:57 1:26 1:55 224 2:52 3:21 Time, b:mm HALLIBURTON Prudhoe Bay Field Laboratory - Rockies NWA Laboratory Project ID Number: 2066967 Customer: Great Bear Well Name & Number: Alkaid 1 Fluid System: Hybor G Date: March 17, 2019 A minutes at 511 1/sec 10 minutes the shear rate was decreased to 100 1/sec Water SL#1070 Technician(s) Performing Testing: Reviewed & Approved By: dOB INFORMATION 1 TESTING CONDITIONS Customer: Great Bear Fluid System: Hybor G Bob Type: B5 Well Name: AlkaidI Water Source: Tap Shear Rate(1/sec): 511/100 Date: March 17, 2019 BHST ("F): 105 Lab Project ID: 2066967 FLUID DESICN Test No: I 2 s Lot nits Chemical Concentrations SL# 1070 opt 0.15 0.15 0.15 0.15 0.15 Total Alkalinity(ppm)1240 get 1.00 1.00 1.00 1.00 1.00 Total Hardness( m 518 ot 30.00 30.00 30.00 30.00 35.00 Chloride m ) Water 207 gpt 1.00 1.00 1.00 1.00 1.00 nClaWebgpt t 1.50 1.50 1.50 1.50 1.50 ort 0.90 0.90 0.90 0.90 0.90 Iron m 0 pt 0.45 0.45 0.45 0.45 0.45 H 6.72 Sulfate m 200.00 gpt 1.00 IM 1.00 1.00 Tem eramre h) 75 Opiate 11 ppt 1.00 1 L00 1.00 1 1.00 1 1 1 1 $ ecifie Gravitv 1 1.006 SP Breaker Per 2.00 1.50 1.00 2.00 ecafculatedvalues 1 Test No: 1 2 3 5 Gel Hydration (511/5)'" Water pH 6.72 6.72 6.72 6.72 6.72 Min Viscosity cP Temp.(or). Base Gel (#) 30.00 30.00 30.00 30A0 35.00 l ILO 75 Base Gel Vise (cP) 240 24.0 24.0 24.0 28.0 2 14.0 75 Base Gel pH 7.45 7.40 7.40 7.45 7.88 3 17.0 75 Base Gel Temp. (aF) 75 75 75 75 75 4 20.0 75 Buffered pH 9.60 9.40 942 9.50 9.74 5 21.0 75 Crosslink pH 9.73 9.45 9.49 9.58 9.75 !0 23 75 Final pH 9.43 9.20 9.10 9.23 9.37 Test Temp. (°F) 105 105 105 105 105 Break Time (hCmin) N/A 1:20 h47 2:33 1:54 Test Notes: ie .......... Shear Rate -Viscosity, -..-..� 5hear Rate -Viscosity --- - Shear Rate - -Viscosity - Shear Rate ----Viscosity -.--.. Shear Rate -Vacosity -- - Shear Rate-Voessity - -- Temperature - -- Temperature- -- Temperature -- Temperature - -- Temperature ---Temperature 1400 - - - 120 1200 --_-_- ______-_____ _ ---^-��----__�__.________ __ -.._ .. _ 100 t 1000 i t 80 800 so 60 600 0 40 400 200 20 0I i 0 0:00 0:28 0:57 1:26 1:55 2:24 2:52 3:21 Time, h:mm Winston, Hugh E (DOA) From: Michael Duncan <michael@greatbearpetro.com> Sent: Friday, May 10, 2019 12:44 PM To: Winston, Hugh E (DOA) Subject: Re: Well completion report production test numbers Those numbers are correct. Thank you Sent from my iPhone On May 10, 2019, at 11:48 AM, Winston, Hugh E (DOA) <hugh.winstonPalaska.gov> wrote: Hi, can you please verify that these numbers are correct so I can process this report? Thanks Huey From: Winston, Hugh E (DOA) Sent: Monday, May 6, 2019 2:35 PM To: Michael Duncan <michael@greatbearoetro.com> Subject: RE: Well completion report production test numbers From the reservoir engineer: "They should report numbers based on the testing after the well has cleaned up, so in this instance it looks like they should ignore the fust 8 hours and only report on the results observed during the following 24 hours." So then in your case I believe the test duration should be 24 hours and oil should be 108 Bbls, gas should be 100 MCF, and water should be 300 Bbls. Then the 24 hour rates will stay the same. Does that sound right? If so I can change the numbers directly on the form. Huey From: Michael Duncan <michael@greatbearoetro.com> Sent: Monday, May 6, 2019 2:01 PM To: Winston, Hugh E (DOA) <hugh.winston@alaska.gov> Subject: RE: Well completion report production test numbers I believe the short test duration is causing the discrepancy. When the well first came on, it was producing very high volumes that were just water, due to the frac. Shortly thereafter the frac load dropped off and the oil rate increased. So, if it made 9 bbl of oil in the first 8 hours, and 108 bbl of oil in the last 24 hours, would you prefer to note the 108 or the average for the 32 hours of the test (88)? If the water started at 1900 bpd and then dropped off to 300, same question? Is it better to report the average (1425?) or the rate that the well leveled off producing (^300bbl) I answered with the data 1 believed is an accurate representation of the well. I certainly see your method, but I feel it indicates a much poorer well than we actually produced. Either way, it's the AOGCC's report so I will defer to your preference. The total duration and volumes are correct. From: Winston, Hugh E (DOA) <hugh.winston@alaska.gov> Sent: Monday, May 6, 2019 2:49 PM To: Michael Duncan <michael@greatbearpetro.com> Subject: RE: Well completion report production test numbers No that is correct, should be the volumes over a 24 hour period. What I have on the report is: 1) Oil - 117 Bbls for 32 hours = 3.66 Bbls/Hour 2) Gas— 100 MCF for 32 hours= 3.13 MCF/Hour 3) Water -1900 Bbl for 32 hours= 59.38 Bbls/Hour Therefore the 24 hour rates should be approximately: 1) 88 Bbls oil for 24 hours 2) 75 MCF Gas for 24 hours 3) 1425 Bbls water for 24 hours ...but the numbers on the report are much different. If these calculations are being done with a program you might want to check the code. If you can verify that the test volumes and the test duration are correct then I can put in the correct 24 hour rates. Huey From: Michael Duncan <michael@greatbearpetro.com> Sent: Monday, May 6, 2019 9:32 AM To: Winston, Hugh E (DOA) <hugh.winston@alaska.gov> Subject: RE: Well completion report production test numbers Perhaps I misunderstood the information requested. I put a 24hr rate as the stable production rate calculated for a 24 hr period. If the 24 hr rate is meant to be a calculation based on the total flow time then I need to recalculate. From: Winston, Hugh E (DOA) <hugh.winston@alaska.gov> Sent: Monday, May 6, 2019 11:47 AM To: Michael Duncan <michael@greatbearpetro.com> Subject: RE: Well completion report production test numbers The oil, gas, and water volumes for 24 hours don't match the volumes over the test period of 32 hours. Our database does the calculation as a cross check and all three came up erroneous. Huey From: Michael Duncan <michaeI6@greatbearpetro.com> Sent: Monday, May 6, 2019 7:52 AM To: Winston, Hugh E (DOA) <hugh.winston@alaska.gov> Subject: RE: Well completion report production test numbers Mr. Winston — I do not see a problem with the numbers in box 27. Is there one in particular that is of concern? Michael Duncan From: Winston, Hugh E (DOA) <hugh.winston@alaska.gov> Sent: Wednesday, May 1, 2019 2:40 PM To: Michael Duncan <michael@greatbearoetro.com> Subject: Well completion report production test numbers Hello, I am inputting data from a well completion report received on April 30th, PTD# 214-208, well Alkaid #1. The numbers listed for the 24 hour rates in box 27 are throwing errors in the database. Could you please verify these numbers and let me know? Thanks Huey Winston AOGCC Stat Tech II 907-793-1241 hu¢h.winston(iWaska.eov Wallace, Chris D (CED) From: Wallace, Chris D (CED) Sent: Tuesday, October 22, 2019 10:11 AM To: Michael Duncan Cc: Schwartz, Guy L (CED) Subject: RE: Alkaid #1 (PTD 2142080) Hydraulic Fracture chemical disclosure Michael, We are still requiring the information on the Alkaid #1 frac. I just checked fracfocus.org and the well is not showing - and we have not received the chemical disclosure in hardcopy and electronic format. Please provide at your earliest convenience so we can progress our reviews. Thanks, �� s Chris I j lei From: Wallace, Chris D (CED) y,f Sent: Thursday, May 23, 2019 7:46 PM To: Michael Duncan <michael@greatbearpetro.com> Cc: Schwartz, Guy L (CED) <guy.schwa rtz@alaska.gov> Subject: Re: Alkaid #1 (PTD 2142080) Hydraulic Fracture chemical disclosure Michael, Yes- we need the chemical disclosue for what was actually pumped, even if we have the planned. Thanks Chris -------- Original message -------- From: Michael Duncan <michael@greatbearpetro.com> Date: 5/23/19 4:41 PM (GMT -09:00) To: "Wallace, Chris D (CED)" <chris.wallacePalaska.gov> Cc: "Schwartz, Guy L (CED)" <guy.schwartz@alaska.gov> Subject: RE: Alkaid #1 (PTD 2142080) Hydraulic Fracture chemical disclosure Hello Chris— Forgive my misunderstanding here, but the chemical disclosure was provided prior to the frac. Would you like this re- submitted? I will work on the fracfocus posting. Thanks Michael From: Wallace, Chris D (CED) <chris.waIlace Pala ska.gov> Sent: Thursday, May 23, 2019 1:48 PM To: Michael Duncan <michael@greatbearpetro.com> Cc: Schwartz, Guy L (CED) <guy.schwartz@alaska.gov> Subject: Alkaid #1 (PTD 2142080) Hydraulic Fracture chemical disclosure We are reviewing the Alkaid #1 Sundry report for the recent fracture stimulation and have a few questions/requests. 1. The 10-407 report doesn't seem to have a chemical disclosure showing the frac chemical CAS numbers. We also require this information in an accompanying electronic version of the chemical disclosure which appears to not have been provided. Please provide a CD or thumb drive with the chemical disclosure (eg FRACFOCUS) information in either excel or PDF format. I will print a hardcopy and place with the well. 2. It is a requirement to post the frac information and chemical disclosure on the fracfocus.org website. Please complete this process so that I can progress our review. Thanks and Regards, Chris Wallace, Sr. Petroleum Engineer, Alaska Oil and Gas Conservation Commission, 333 West 7" Avenue, Anchorage, AK 99501, (907) 793-1250 (phone), (907) 276-7542 (fax), chris.wallace(&alaska.gov CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793-1250 or chris.wallace@alaska.gov. Oo !/ f) {/ E k ) ) ) ) })�j\; _ ! „ _ !! „ ! ! ! !! „ ..Z!r. | ){kk�j (\ \ \ \ (\ ) - `!!!) ) - - !,!!!!! ! ! ,!!!! : - - (_=•�.,e;;;�,_.. - -::- : - - --- : �- ~: < . ! 1u|| : § zz : _ ! WZ;\�;)$ \�,, !� ! f i 2 : - §��\i!§ir!!«,, !§(§(]/§/,; cow =,I;,E,l:>!§§!! ! / ){ ! ! ! ! t| {{ {/ / ! /| ! ! § ;/; §; !;� f/!*z}} ;];( 2 !_ 2 ! !};(�§) Em ) ! - _ _; |45 ]\ \ \/\\\ / \\\\\\) \0 \ \\/ k E //! ) Schwartz, Guy L (DOA) From: Michael Duncan <michael@greatbearpetro.com> Sent: Friday, May 17, 2019 8:57 AM To: Schwartz, Guy L (CED) Subject: RE: Alkaid 1 (PTD 214-208) We had some pressure build that we attributed to heating (110 degree water pumped in a cold well). We bled the pressure down in the cellar. The volumes were very low and we did not see any indication that is was sustained flow, nor communication with the pressure pumping. From: Schwartz, Guy L (CED) <guy.schwartz@alaska.gov> Sent: Friday, May 17, 2019 11:26 AM To: Michael Duncan <michael@greatbearpetro.com> Subject: RE: Alkaid 1 (PTD 214-208) Also, The Halliburton frac report mentions so OA pressuring during the pad stage. Can you elaborate... I don't see this on the plots but it may not have had a sensor tied in. regards Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793-1226) or (Guy schwartz@alasko aov). From: Schwartz, Guy L (CED) Sent: Friday, May 17, 2019 8:25 AM To: Michael Duncan <michael@greatbearpetro.com> Subject: Alkaid 1 (PTD 214-208) Do you have any pictures of the wellhead and site after the rig left?? Also, the site will require a suspended well inspection within 1 year. Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged 7-3ac K P11 :�5r`.L'S.4'l��. ..4'^a."TWs. .IS �dSW'il��l."✓' 'wh 's¢e..-.r_ `.....i Il�l�a .. ... mm momomom000a0000®®®®■o®mono©oommomoo©©m000�mo©om�oo� mm® mmmmmmmmmm�mmm�mmmmmmmmmmmmm®mm�mm�mm�mmmm•�0000mo�� �� m�mmm�otmmm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmm•��0000mo�� ®� mmmmmm©mmm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmo��0000mo�� comma mmmmmmotmmmmmmm�mmmmm®mmmmmmmmmm�mm�mm�mmo��0000mo�� mmmt mmmmmmofmmm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmo��0000ma�� mmm mmmmmmmmmmMOmmmMmmmmm®mmm ME mmm=l mmmmmmmmmm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmm��oaoomo�� mmm mmmmmmmmmmm�mmmm�mmmmmmmmmmmmm©mm�mm�mm�mmmmim�0000�Om�m� MMM mmmmmmmmmm�mmmEmmmmmmmmmmmmmmmm�mm�mm�mmmm•�oaoomo�� comma mmmmmmmmmm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmmams�0000OEM mm® mmmmmmmmmm�mmm�mmmmm®mmmmmmmmmm�mm�mm�mmo��a000mo�� mm® mmmmmm©mmm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmm•��ooaomo�� mmm'J mmmmmmmlmmmm�mmmm�mmmm�mmmmmmmmmlmm�mmmlmm�mm�m�m�00om•�Om�m� mmm, mmmmmmm mmmmmmmmmmmmmmmm�mm�mm�mm���0000mo�� ®ma mmmmmmotmmm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmm®�0000mo�� ®® mmmmmmm®mm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmma®�0000mo�� mm® mmmmmmo®mm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmmam��0000®a�� mmm mmmmmmm®mm®mmm�mmmmmmmmmmmmmmmm�mm�mm�mm®®�0000�o�� m- mmmmmmmmm®©mmmm�mmmmmmmmmmmmmmmm�mmMmmm�mmms®�ao0o�o�� Mg mmmmmmmmmmmNmmmmMmmmmmmmmmmmmmmmm�mmMmm�mm®®�0000®Om�m� R= msmo mmmmmmmmmm�mmm�mmmmmmmmmmmmmmmm�mm�mm�mmmm�oaaomo�� �m mmmmmmommmmmmm�mmmmmmmmmmmmmmmmIMmmIMmm�mmm•o�a000®o�� mmmmmmmmmm®mmmmMmmmmmmmmmmmmmmlmmIMmmIMmmm�mmm®m�OOm•0®o�m� mmm mmmmmm©mmm®mmm�mmmmmmmmomommmmm�mm�mm�mmm®�oom�®®o�� mmo mmmmmmmmmmmm®mmm®mmmm®mommmmmmm�mmmmm�mmo©��oo�m��� mxamt mmmmmmmmmmmmmmmmmmm®mmmmmmmmmm�mmmmm�mmm©��o®®®��� � mmmmmmmmmmmmmm�mmmmmmmmmmmmmmmm�mmmmm�mmo®�mo®®m®�� ®m mmmmmmm®mmm�mmm�mmmmmmmmmmmmmmmm�mmmmml�mmm�®�®om•m®®�� comma mmmmmmolmmm�mmm�mmmmmmmmmmmmmmmm�mmmmm�mmm®�mo®m®m�� mmmmmmommm®mmm�mmmmmmmmmmmmm©mm�mmmmm�mmo®�Mm MNME� mm® mmmmmmommm mmm�m®mm®®mmmmmmmmmm�mmmmm�mmo®��a�®®��� ME mmmmmmmmmm�m®mmm®mm®mmmmmmmm©mm�mmmmm�mmo®��a®mmm��� �® mmmmmmmmmmmm®mmm®mmm®mmmmmmmmmm�mmmmm�mmo®��am•m®ME ME mmm mmmmmmmmmmmmmm�mmmmmmmmmmmmmmmmIMmmmmm�mmo®�mommmm�ME m®IM mmmmmmm®mm M mo ME mmmmmm© ME ®® mo■■■■v®®m®�®mmmmmmm®m■■■■�m�mo�®mmm���o©�momm®o�� comma mmmmmmmmmm®m®mmmmmmmmmmmmm©mmmmmm•mmmmm�mmom�mom•®®ms�� =Mmm ©mmmmmmmmmmm®mmmmmmmmmmmmmmmmmmm�mmmmm�mmo® mom.®®®OMME g mamma mommmmmmmm®m®mmmm®mmmmmmmm©mmmmmommmmmMMm mom.®mmEMME comms mmmmmmmmmm®m®mmmmmmmmmmmommmmmm moa®oma®a®a®m�ME comma mmmmmmm®mmmmmmmmmm®mmmmmommmmmm,mmmmm�mmo®�mo�®®®SME mea® mmmmmmmEm= mMMM mmmmmmmmmmmmmmmmmommmmm�mmoa®�mom•aaata®m�MW comma mmmmmmo Mmmmm®m IMmmtmmmmmmmmaammmmmazammmmm�mmoa®�momat®aaatmmM comma mmmmmmmmm®aa7mmm�mmtmmmmmmmmmmm®mm®mmmmm�mmoME EMMEa®�mmaME comma mmmmmmmmmm®m®mmmmmmm®mmmmmmmmmmmmmmmmmMNM oMm m=m. ME omnia mommmmmmmm®mmMMMM mmmmmmmmmmmmmm®mmmmm�mmo®�mo®avam®�M mamma mommmmmmmmamm®mmmm®mmmmmmmmmmmmm®mmmmm�mmoa®�ooa©a®®m��� comma mmmmmmmmmmmm®m�mmmmmmmmmmmmmmmmm•mmmmm�mmo©�m�o�®®m��� �® mmmmmm©mmmmmmmmmm®mmmmmmmmmmmmmmm•mmmmm�mmom�mom.®®��� comma mmmmmmmmmm�mmm�mmmm®mmmomomm©mmm•mmmmmt�mmoa®�m�oa�a®©��� mama mmmmmmmmmmmmmm�m®mm®mmmmmmmmmmmmrmmmmm�mmo®�®om.®mmm�� ®� mmm■■■v®mmm�mm�mmmmmmm■m■oo■m■mmt■mmmm���o®�mo�®®m��� mmo mmommmmmmmmmmm�mmmmmmmmmmmmmmmmm.mmmmmmmmmm®�m�o®®®m�� ®o moo■■■om®©mmmm�mommmmm■m■■©■©■mm■mo®oma■■m®�®o0o®m��� �m ©v■■■■v©mmmm®o�mm®m®mm®m■■v■©■mo�mmmm�■■o®�m�o®m®��® ®� mo®■■■om®��®®mmmm®m®®©m©■oma®�©m�mmmm���o®��o�o®®�© ®® mmmmmmmmmmamm®m�mmmmmmmmmmmmmmmmmmmmmm�mmo®�®oaaata�®®�© m®ma mmmmmmmmmmmmm©mmmm®mmmmmmmmmlmmm•mmm,mm�mmam��®®®®®�© �® mmmmmmm®mm©m©m�mmmmmmmmmmmmm©mmm•mmmmm�mmo®�®®mam•®��© �® mmmmmmm®mmmm®mmmm®mmmmmmmmmmmmmmm•mmmmm�mmo®��®m.m•®®moo �� mmmmmmotmmmmmmm�®mmmmmmmmmomm©mmm•mmmmm�mmo®�®®®tea®��aas ®® mmm■�■O®®�®ml®�®mmm®m®®mmm©■D©®®�®��m®®©����®��®��®��® �m mo■■■■o©mm®©®m®®mom®m®®m■■■m©■m®■mm®©�■s�®�m�®®®®��mt �0 mOm■■■ml®mm�ml®©®®mmm��m®m■OO®©�mm�mm®®����®��®®®®��0 �� 0���■■0©®■m®mmm®®m®m®®m®m■0©■m■mmm■®m®mm■■m®��®��®m�0 �� mmmmmmommmmmmmam.mmmmmmmmmmmmm©mmmmmmmmommm�amt�®®��av��av wAc.ma.mx v=wp=9 A.., ®� �©mmmmmmmm®®m®mmmm�mmmmmm®mmm®mm���m�®����®®��®' mmm ®® o■ma■■■®®m®®®©® ®IN® ®®®®®SI© m:=® mommmmolmmmmmmm®o®®m®©mmommommmom�mmmm=���®��®m•®®��© �® mOm���ml®mm®m®mmm®mmmmm NBC= mmmm mmmmm��®®��®gym®®��0 m�mt mommmm©®mmmamom®m®®m®mmmmmmmmmmm®�mmmmm,���®��®®®®gym mm® M11= mmmmmmMEMO mmmmm®®mmmmmm�mmmmmmm�mmm®m���®��®o®®��® �� m�mma® � E3= mommmmo®mm®mmm®mm®m�mmmmmmmmmm©m�mmlmmm���®��®�®®®�® mommmmmt®mm®mmm®om®m®mmmmm®mmmmm®o�mmlm®m����� mm mm©mmmm..m.mo®mmmm®mmm®mmmmmmmmmmm,mmmmm®m������ mmmmm® MEMO m ®®mmmm mmomMmmmm� mmK=lMlMm=lc3mM ®®�� ME ®m mmmm� ®m m ® �0®®® oomf ME®oom® ME 'Mm ME INEIM MEMI MIMIN MEMI 00 MOM WIM� Mims=������������������� =NNMN=�Mm IM MM= ME IM mmmm MEMMEMI am WIMIN am= MM IMMIMMIC �s mmmmm��m���������mmmmmmmmmm���m��m��������������a�� wAc.ma.mx v=wp=9 A.., Technical Report Title Date Client: Eni Petroleum Field: Nikaitchuq Rig: Doyon 15 Date: April 2, 2014 Surface Data Logging End of Well Report SP24-SE1 SP24-SE1 L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Show Reports 7. Mud Record 8. Bit Record 9. Morning Reports 10. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: Eni Petroleum Rig: Doyon 15 Well: SP24-SE1 & SP24-SE1 L1 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-629-23510-00-00 (SP24-SE1) 50-629-23510-60-00 (SP24-SE1 L1) Sperry Job Number: AK-XX-0901144926 Job Start Date: 25 Feb 2014 Spud Date: 26 Feb 2014 Total Depth: 15240’ MD, 3580’ MD (SP24-SE1) 15225’ MD, 4019’ TVD (SP24-SE1 L1) North Reference: True Declination: 19.454° Dip Angle: 81.052° Total Field Strength: 57627.841 nT Date Of Magnetic Data: 26 February 2014 Wellhead Coordinates N: North 70° 33’ 27.85” Wellhead Coordinates W: West 149° 54’ 19.62 “ Drill Floor Elevation 53.93’ Ground Elevation: 13.10’ Permanent Datum: Mean Sea Level SDL Engineers: A. Paul Kalenuik, Kori Jo Plowman, Jade Miller SDL Sample Catchers: Julia Ruth, Jane Grundin, Gregory Dellner, Christopher Ward Company Geologist: Andrew Buchanan Company Representatives: Mike Ross, Jack Keener SSDS Unit Number: 110 DAILY SUMMARY 02/24/2014 Begin rig move operations and spot Sperry SDL unit. Mudloggers rig up unit and calibrate gas equipment. 02/25/2014 Continue to rig up and set up new well. 02/26/2014 Clean out conductor. Pick up BHA #2. Drill ahead and survey every 15’ to 500’ MD to ensure safety from anti-collision. Drill ahead to 842’ MD. Gas: The max gas was 10 units at 753’ MD and the average gas was 4 units. Geology: No samples collected during surface section. 02/27/2014 Continue to drill ahead in surface section from 842’ MD to 1695’ MD. Gas: The max gas was 83 units at 1685’ MD and the average gas was 19 units. Geology: No samples collected during surface section. 02/28/2014 Continue to drill ahead from 1695’ MD to TD at 2915’ MD. Encounter packing off and stuck pipe from 2839’ MD to 2869’ MD. Gas: The max gas was 378 units at 1944’ MD and the average gas was 103 units. Geology: No samples collected during surface section. 03/01/2014 Trip out of hole and lay down BHA #2. Clean and clear rig floor. Rig up to run 13 3/8” casing. Run casing to 1174’ MD. Gas: The max trip gas was 724 units. . 03/02/2014 Finish running casing to 2900’ MD. Cement casing. Nipple up BOPE 03/03/2014 Service rig and test BOPE. Rig down BOPE equipment, pull test plug, install wear ring per Vetco Grey. Make up BHA #3. 03/04/2014 Continue to make up BHA #3. Run in the hole to 1600’ MD and shallow hole test. Run in the hole to 2721’ MD and perform casing test at 2500 psi. Drill out float and 20’ of new hole. Perform FIT to 12.77 ppg. Drill ahead form 2935’ MD to 3465’ MD. Gas: The max gas was 35 units at 3079’ MD and the average gas was 15 units. Geology: Samples consist mainly of Sandstone. 03/05/2014 Continue to drill ahead from 3465’ MD to 4554’ MD. Gas: The max gas observed was 19 units at 4264’ MD and the average gas was 7 units. Geology: Samples consist mainly of Sandstone. 03/06/2014 Continue to drill ahead from 4554’ MD to intermediate TD of 5263’ MD. Off bottom at 18:30 and begin to back ream out of hole per K&M representative. Gas: The max gas observed was 400 units at 4842’ MD and the average gas was 64 units. Geology: Samples consist mainly of Sandstone with some Siltstone. 03/07/2014 Continue to back ream out of hole to 2900’ MD. Pull out of hole, lay down BHA #3 and clean rig floor. Gas: The max trip gas observed was 84 units. Geology: No samples collected 03/08/2014 Rig up and rig down test equipment. Pull test plug and set wear ring. Run in hole with 9 5/8” casing. Set casing at 5237’ MD. Lay down casing equipment. Rig up cement head and circulating equipment. Circulate and condition mud. Gas: The max gas observed while running casing was 61 units. Geology: No samples collected 03/09/2014 Pumped cement and conducted injectivity test. Rig down cement equipment and cleaned rig floor. Nipple down BOP stack, cut casing, and Nipple up BOP stack. Tested BOP and rig down test equipment. Gas: No gas due to pumps being off. Geology: No samples collected 03/10/2014 Pulled test plug and set wear ring. Cleaned and cleared rig floor. Picked up 5” Drill Pipe and rigged up test equipment. Tested 9-5/8” casing. Picked up BHA tools. Change out upper/lower IBOPs and actuator shell. Test equipment and make up BHA #4. Gas: No gas due to pumps being off. Geology: No samples collected 03/10/2014 Pulled test plug and set wear ring. Cleaned and cleared rig floor. Picked up 5” Drill Pipe and rigged up test equipment. Tested 9-5/8” casing. Picked up BHA tools. Change out upper/lower IBOPs and actuator shell. Test equipment and make up BHA #4. Gas: No gas due to pumps being off. Geology: No samples collected 03/11/2014 Continue to pick up BHA #4. Run in hole with 5” drill pipe, perform shallow hole test, and log CSG collars. Displace mud from LSND to OBM. Cut and slip drill line, service rig. Drill out cement and 20’ of new hole. Perform LOT and FIT test. Drill ahead. Gas: Maximum gas was 862 units at 6355’ MD and average gas was 435 units. Geology: Samples consisted of sandstone. 03/12/2014 Continue to drill ahead from 6363’ MD to 8732’ MD. Gas: Maximum gas was 1225 units at 7973’ MD and average gas was 576 units. Geology: Samples consisted mostly of sandstone, some siltstone present. 03/13/2014 Continue to drill ahead from 8732’ MD to 11366’ MD. Gas: Maximum gas was 1344 units at 10600’ MD and average gas was 644 units. Geology: Samples consisted entirely of sandstone. 03/14/2014 Continue to drill ahead from 11366’ MD to 13718’ MD. Gas: Maximum gas was 1555 units at 12048’ MD and average gas was 398 units. Geology: Samples consisted mostly of sandstone, some siltstone present. 03/15/2014 Continue to drill ahead from 13718’ MD to 15240’ MD. Begin to back ream. Gas: Maximum gas was 1526 units at 14851’ MD and average gas was 537 units. Geology: Samples consisted mostly of sandstone, some siltstone present. 03/16/2014 Continue to back ream out of hole from 15170’ MD to 9168’ MD. Gas: Maximum trip gas observed was 62 units. 03/17/2014 Continue to back ream out of hole from 9168’ MD to 5237’ MD. Gas: Maximum trip gas was 18 units. 03/18/2014 Back ream out of hole and circulate bottoms up. Pull out of hole from 2539’ MD to 392’ MD and lay down BHA #4. Clean and clear rig floor. Rig up to run liner, upload MWD tools, remove from pipeshed, and stage liner jewelry in pipeshed. Run 5.5” liner to 7245’ MD. Gas: Maximum trip gas was 12 units. 03/19/2014 Finish running liner and lay down liner tools. Rig up e-line, run in the hole and correlate for logs. Gas: No gas due to pumps being off. 03/20/2014 Continue e-line logging. Rig down wire line. Pick up BHA #5 and run in the hole to the top of the liner. Pull out of the hole and lay down BHA. Make up upper and lower mill assembly. Make up whipstock BHA #6. Trip in the hole and establish milling rate. Orient and set whipstock. Mill casing window. Gas: Maximum trip gas was 6 units. 03/21/2014 Continue to mill 8.75” window in casing and 28’ of rathole to 5126’ MD. Rig up and perform formation integrity test to 13.0 ppg. Pull out of hole and lay down BHA #6. Make up BHA #7 and trip in hole. Drill from 5126’ MD to 5326’ MD. Begin to trip out of hole to pick up the production BHA. Gas: Maximum gas was 41 units at 5192’ MD and average gas was 22 units. Geology: Samples consisted mostly of sandstone, some siltstone present. 03/22/2014 Continue to pull out of hole and lay down BHA #7. Rig up test equipment and test BOP’s. Rig down BOP test equipment. Begin to make up BHA #8. Gas: Maximum trip gas was 27 units. 03/23/2014 Continue to make up BHA #8. Run in the hole to 1500’ MD and perform a shallow hole test. Run in the hole to 5060’ MD then slip and cut the drill line. Service the rig. Drill 8.75” production hole from 5326’ MD to 6830’ MD. Gas: Maximum gas was 1154 units at 6126’ MD and average gas was 635 units. Geology: Samples consisted mostly of sandstone, some siltstone present. 03/24/2014 Continue to drill ahead from 6830’ MD to 9493’ MD. Gas: Maximum gas was 1415 units at 7409’ MD and average gas was 804 units. Geology: Samples consisted mostly of sandstone, some siltstone present. 03/25/2014 Continue to drill ahead from 9493’ MD to 12207’ MD. Gas: Maximum gas was 2620 units at 11478’ MD and average gas was 1298 units. Geology: Samples consisted of mostly sandstone with some siltstone. 03/26/2014 Continue to drill ahead from 12207’ MD to 13738’ MD. Gas: Maximum gas was 2761 units at 12943’ MD and average gas was 1278 units. Geology: Samples consisted of mostly sandstone with some siltstone. 03/27/2014 Continue to drill ahead from 13738’ MD to 15225’ MD. Gas: Maximum gas was 2951 units at 13713’ MD and average gas was 1151 units. Geology: Samples consisted of mostly sandstone. 03/28/2014 Back reaming out of hole. Gas: Maximum Trip gas was 130u. 03/29/2014 Back reaming out of hole. Lay down BHA # 8 and pick up BHA # 9 03/30/2014 Drop rabbit. POH. L/D whipstock & retreival tool. C/O saver sub & inspect top drive. R/U Volant tool. Run 5.5” liner to 962’. 03/31/2014 RIH 5.5" Liner. Liner went thru window no problems. RIH w/5" DP & tag bottom at 15225'. Shoe at 15210'. Set at 4865’. Drop ball & shear f/packer. In the process of displacing to 9.2 lb/gal Brine at 3 bpm. 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 0 5 10 15 20 25 30 35 40 45 Me a s u r e d D e p t h Rig Days Prognosed Actual WELL NAME: SP24-SE1 & SP24-SE1 L1 OPERATOR: Eni Petroleum MUD CO: MI Swaco RIG: Doyon 15 SPERRY JOB: AK-XX-0901144926 Days vs. Depth 20 February 2014 Sperry SDL remain on location from previous well LOCATION: Spy Island AREA: Nikaitchuq STATE: Alaska SPUD: 26-Feb-2014 TD: 27-Mar-2014 Commenced 16.0" Surface Hole Section On Bot: 01:03 26 Feb 2014 TD Surface Hole Section 2915' MD, 2462' TVD Off Bot: 22:23 28 Feb 2014 Landed 13.38" Casing 2900' MD, 2450' TVD 02 Mar 2014 Commenced 12.25" Intermediate Hole Section On Bot: 15:00 04 Mar 2014 Landed 9.625" Casing 5237' MD, 3916' TVD 08 Mar 2014 TD Intermediate Hole Section 5263' MD, 3924' TVD Off Bot: 18:25 06 Mar 2014 Commenced 8.75" Production Hole Section On Bot: 11:32 11 Mar 2014 TD Production Hole Section 15240' MD, 3580' TVD Off Bot: 21:45 15 Mar 2014 Mill 8.75" hole to 5326' MD POOH to test BOPs and Change to Production BHA 21 Mar 2014 Commenced 8.75" Production Hole Section L1 On Bot: 10:50 23 Mar 2014 TD Production Hole Section 15225' MD, 4019' TVD Off Bot: 22:59 27 Mar 2014 WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Surface EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 AK-XX-0901144926 Alaska SP24-SE1 Spy Island Eni Petroleum Nikaitchuq Field Paul Kalenuik 28-Feb-2014 What went as, or better than, planned: The gas gas gear ran as expected. Drilling commenced and continued without interuption to TD. Difficulties experienced: New computers were installed before the beginning of this new section. Some difficulties were experienced mostly due to getting used to the new windows 7 operating system. Some things needed to be configured from scratch as the config files were not saved from the previous computers. Recommendations: Make sure to save all configuration files to an external source. Innovations and/or cost savings: N/A Surface Data Logging After Action Review Surface Data Logging WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Intermediate EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Jade Miller 6-Mar-2014 What went as, or better than, planned: Overall, gas equipment worked well and there was minimal data lost for the intermediate section. Difficulties experienced: WITS had to be remapped in order to receive gamma data from Schlumberger. The gas chromatograph had to be re-started once during drilling but otherwise functioned properly. Recommendations: If possible, a trial run of WITS and all other functions should be performed before drilling begins. At this time there is not a way test WITS configurations before we start receiving data from a 3rd party. If there was a way to send psuedo data via WITS we could test configurations prior to the start of drilling. Innovations and/or cost savings: N/A AK-XX-0901144926 Alaska SP24-SE1 Spy Island Eni Petroleum Nikaitchuq Field Surface Data Logging After Action Review Surface Data Logging WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 AK-XX-0901144926 Alaska SP24-SE1 Spy Island Eni Petroleum Nikaitchuq Field Kori Jo Plowman 15-Mar-2014 What went as, or better than, planned: During production drilling the gas equipment worked as it should. Difficulties experienced: While drilling, during most connections, Insite would either get stuck in slips or not go in at all. This issue was attempted to be corrected by changing the hookload with no luck.The ECD is not being WITSed to Canrig for reasons neither party has been able to figure out. This requires us to send an override every few minutes. During drilling, the workstation shut down for an update. After the workstation came back on, the settings were changed to ask before an automatic update. On several occasions, all of the computers lost connection to the MADI computer. The MADI needs to be shut down and restarted while the other computers need to close Insite, then reopen all applications, start WITS, start 8900, and anything else that was open. During one of these connection losses when WITS was restarted to send to Canrig it would not. The comport had changed to an incorrect setting and needed to be changed back. Restarting computers, Insite, re-pointing traces, and updating all descriptors was extremely time consuming while drilling. Recommendations: While drilling, during each connection watch the slips and adjust the depth accordingly before drilling begins again. Have an actual IT person come out to location to address computer issues, such as comports changing and computers lossing connection to the data base, issues that have not been solved by phone communication. Innovations and/or cost savings: N/A Surface Data Logging After Action Review Surface Data Logging WELL NAME:SP24-SE1 & SP24-SE1 L1 LOCATION:Spy Island OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:26-Feb-2014 SPERRY JOB:AK-XX-0901144926 TD:27-Mar-2014 Marker MD INC AZ TVD TVDSS 16" Surface Borehole 20" Conductor Shoe 160.0 0.7 279.2 160.0 -106.1 SV-4 774.0 18.0 293.5 766.3 -712.4 SV-3 1,172.0 33.1 299.0 1,122.3 -1,068.4 SV-2 1,492.0 41.0 297.7 1,374.2 -1,320.3 Permafrost Base 2,010.0 45.3 297.0 1,756.4 -1,702.5 SV-1 2,248.5 43.6 290.2 1,923.3 -1,869.4 Ugnu Top (UG4)2,652.0 34.2 268.4 2,239.6 -2,185.7 13 3/8" Casing Shoe 2,900.0 30.2 252.9 2,449.5 -2,395.5 TD 16" Borehole 2,915.0 29.9 251.8 2,462.4 -2,408.5 12 1/4" Intermediate Borehole UG-2 Coal Bed Marker 3,232.0 25.3 222.4 2,743.2 -2,689.3 Lower Ugnu 4,048.0 47.3 163.1 3,422.0 -3,368.1 Schrader Bluff 4,520.0 64.2 145.0 3,687.8 -3,633.9 N Sequence Top 4,639.0 67.9 142.4 3,736.4 -3,682.4 N Sand Top 4,759.5 70.9 139.7 3,778.1 -3,724.1 N2 4,781.0 71.3 139.4 3,785.0 -3,731.1 N3 4,799.0 71.3 139.5 3,790.8 -3,736.9 N Sand Bottom 4,914.0 71.4 138.4 3,827.5 -3,773.6 N Sequence Base 5,088.0 74.6 132.9 3,879.4 -3,825.5 9 5/8" Int. Casing 5,248.0 78.4 132.1 3,918.6 -3,864.7 TD 12 1/4" Borehole 5,263.0 79.2 132.4 3,921.4 -3,867.4 8 3/4" Lateral Leg - SP24-SE1 OA-1 5,502.0 85.2 125.6 3,944.7 -3,890.8 OA-2 5,633.0 85.3 126.5 3,956.0 -3,902.1 OA-3 5,737.0 87.0 127.9 3,963.2 -3,909.2 OA-3 6,010.0 89.8 126.7 3,967.0 -3,913.1 OA-3 6,110.0 88.3 124.8 3,968.6 -3,914.7 OA-3 6,600.0 92.3 124.4 3,981.2 3,927.3 OA-2 6,690.0 92.4 122.5 3,977.5 -3,923.5 OA-1 6,780.0 92.0 121.8 3,973.9 -3,920.0 OA-1 7,015.0 96.9 123.7 3,976.7 -3,922.8 OA-2 7,710.0 90.5 129.7 3,986.7 -3,932.8 OA-3 7,930.0 87.1 128.5 3,989.2 -3,935.3 OA-3 9,432.0 92.0 125.3 4,009.0 -3,995.0 OA-2 9,500.0 92.1 124.9 4,004.4 -3,950.5 OA-1 9,920.0 88.7 125.1 4,006.3 -3,952.3 OA-1 10,152.0 86.4 126.7 4,016.0 -3,962.0 OA-2 10,390.0 87.8 128.1 4,027.3 -3,973.3 OA-3 10,495.0 88.7 129.0 4,030.7 -3,976.8 OA-4 10,955.0 88.1 126.5 4,042.6 -3,988.7 OA-4 11,190.0 91.5 126.0 4,041.5 -3,987.6 OA-3 12,575.0 92.1 125.9 4,023.5 -3,969.6 OA-2 12,750.0 92.1 125.7 4,016.0 -3,962.1 OA-2 13,430.0 90.7 124.6 4,011.1 -3,957.1 OA-2 13,665.0 92.1 124.6 4,005.2 -3,951.3 OA-1 13,800.0 91.9 125.6 3,999.9 -3,946.0 OA-1 13,985.0 88.0 125.9 4,000.1 -3,946.2 OA-2 14,230.0 87.6 126.8 4,005.7 -3,951.8 OA-3 14,375.0 88.3 126.7 4,011.9 -3,957.9 TD 8 3/4"15,240.0 92.0 126.0 4,016.2 -3,962.3 Formation Tops WELL NAME:SP24-SE1 & SP24-SE1 L1 LOCATION:Spy Island OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:26-Feb-2014 SPERRY JOB:AK-XX-0901144926 TD:27-Mar-2014 Marker MD INC AZ TVD TVDSS 8 3/4" Lateral Leg - SP24-SE1 L1 TOW 5,081.0 75.8 134.2 3,877.3 -3,823.3 BOW 5,098.0 76.0 133.0 3,881.4 -3,827.5 OA-1 5,511.0 85.7 116.0 3,944.8 -3,890.8 OA-2 6,719.0 87.7 125.5 3,983.0 -3,929.1 OA-3 6,818.0 87.5 126.3 3,986.9 -3,933.0 OA-4 7,706.0 88.9 126.3 4,008.6 -3,954.7 OA-4 7,866.0 91.9 125.9 4,006.0 -3,952.1 OA-3 8,177.0 92.7 124.9 3,992.3 -3,938.4 OA-2 8,296.0 90.4 124.4 3,989.7 -3,935.8 OA-2 9,438.0 86.6 126.4 4,009.1 -3,955.2 OA-3 9,521.0 86.8 126.5 4,014.0 -3,960.1 OA-3 10,433.0 92.0 127.6 4,034.0 -3,980.0 OA-3 10,602.0 89.9 126.3 4,030.1 -3,976.2 OA-3 10,848.0 92.2 126.3 4,028.1 -3,974.1 OA-2 10,949.0 93.0 126.8 4,023.3 -3,969.3 OA-2 12,361.0 88.1 124.1 4,015.3 -3,961.4 OA-3 12,484.0 88.3 124.2 4,019.8 -3,965.9 OA-3 14,691.0 92.0 124.1 4,007.2 -3,953.3 OA-2 14,882.0 91.0 123.4 4,005.6 -3,951.7 TD 8 3/4"15,225.0 89.3 121.0 4,009.5 -3,955.5 Formation Tops Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 56 0 56 0 0 0 0 No producible oil within these zones based upon gas and chromatograph data collected. 0 3684863 12004759242 34 25 11 9 17044 1425 152614850 29 0 29 89 10 79 29 241 36 205 0 0 33 0 0 33 0 51608 5426 46182 30432 6000 241 0 104 -0 14 0 14 124 20 0 0 25091 1200 1792 - 212 1100 1471 1847 - 248 4841 54559 48559 229 19 400 0.00 0 11 0 29 15619 0 0 539 539 279 4198 - 198 Interpretation: Show Report Report # 1 5100 3882 4700 3758 N Sands 17-Mar-2014 1100 225 SP24-SE1 Spy Island ENI Petroluem Jane Grundin Andrew Buchanan - 5341 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 204 1 203 0 67 204 33 No producible oil within these zones based upon gas and chromatograph data collected. 171 11747433 15005546858 262 218 461 44 151528 8209 12237974 204 3 201 633 24 609 241 627 59 568 206 22 219 431 45 241 386 148978 6654 142324 111149 3030 303 67 366 1655216 153 0 153 366 0 216 0 110858 1800 725 513 245 1500 678 653 385 633 6535 151528 148498 605 28 963 0.00 65 396 8 233 143319 158 48 615 713 706 359 901 235 Interpretation: Show Report Report # 2 8000 3852 5500 3944 OA-Sequence 17-Mar-2014 1800 251 SP24-SE1 Spy Island ENI Petroluem Jane Grundin Andrew Buchanan 868 291 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 17-Mar-2014 83500 288 SP24-SE1 Spy Island ENI Petroluem Jane Grundin Andrew Buchanan 845 7199 Interpretation: Show Report Report # 3 10300 3765 8200 3844 OA-Sequence 1050 3673 2153 423 936 299 0.00 65 347 36 119 124898 157 48 553 9379 147690 146979 553 0 1165 133806 82000 743 396 266 89000 724 874 393 226 46 180 591 74 399 61 153560 6654 146906 141005 711 259 191 517 892338 569 59 510 205 0 203 374 0 203 374 147 113 34 480 62 418 155 212 168 412 44 130924 6026 102310310 174 0 No producible oil within these zones based upon gas and chromatograph data collected. 174 12149700 8950082681133 1 2 3 4 147 89 58 41 150 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 166 68 98 90 90 152 42 No producible oil within these zones based upon gas and chromatograph data collected. 110 139411824 89000106001323 183 140 361 43 189180 7098 154512271 354 91 263 621 56 565 185 594 89 505 169 24 133 301 73 157 228 173638 9908 163730 168328 5009 284 180 560 1766252 197 40 157 635 75 374 122 158916 79000 1012 631 303 81000 1138 1170 664 548 11547 156360 151351 500 48 1255 0.00 122 239 26 159 182082 87 82 1145 692 1858 685 1882 322 Interpretation: Show Report Report # 4 12300 3690 10600 3754 OA-Sands 17-Mar-2014 81000 324 SP24-SE1 Spy Island ENI Petroluem Kori Jo Plowman Andrew Buchanan 1376 9412 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 125 53 72 85 70 155 65 No producible oil within these zones based upon gas and chromatograph data collected. 90 140414054 78000129361325 145 102 320 43 190246 3112 152614850 257 50 207 625 34 591 124 598 92 506 166 25 123 320 88 148 232 172370 13932 158438 164243 8531 308 155 497 2187221 157 34 123 558 61 326 105 153099 77500 1245 693 300 77000 1193 1553 633 538 13416 155275 146744 489 49 1265 0.00 136 184 15 109 187134 72 94 1717 904 2599 861 2201 317 Interpretation: Show Report Report # 5 14900 3592 12900 3668 OA-Sands 17-Mar-2014 80000 313 SP24-SE1 Spy Island ENI Petroluem Kori Jo Plowman Andrew Buchanan 1630 11144 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: no Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Free Oil in Mud Intensity Color none lt brn wh Cut Fluorescence 712 108 604 707 315 84 231 451 Fluorescence Cuttings Analysis: 596 234 362 1338 279 157 122 469 6125 Gas Units 1154 Mud Chlorides (mg/L) = Residual Cut stmg-bloom dul wh 56108 12986 43122 234 78000 148 0 148 174058 10799 163259 270 529 251 278 460 3 92 315 252 115 137 1268 142 50 7409 Gas Units 1415 Mud Chlorides (mg/L) =83000 627 255 51 131918 4 204 278 88 190 Gas Units 1114 Mud Chlorides (mg/L) = 70 34 Hydrocarbon Ratios 14 513 498 256 72 184 595 110 485 674 7048 77000 317 139705 11701 128004 264 104 2 400 4 396 252 0 252 847 527 1014 Mud Chlorides (mg/L) =78000 6538 125380 244 Oil Show Rating Residual FlourescenceColor Amount 70% even dul pl straw/bnColor 1 Hydrocarbon Ratios 5866 Gas Units Cut yel 3930 4008 ENI Petroleum Interpretation: This interval displays a non-producible hydrocarbons and is not associated with any heavy hydrocarbon gases. Show Report Report # 6 SP24-SE1L1 5327 7801 Spy Island, AK none-fntAmountTypeStain Jade Miller OA-1 Andrew Buchanan 3/29/2014 Odor brnColorColor pl straw/bnIntensity IntensityAmountDistribution Color 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: no Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Free Oil in Mud Intensity Color none lt brn wh Cut Fluorescence 877 137 740 866 320 81 239 558 Fluorescence Cuttings Analysis: 596 225 371 1534 280 145 135 574 8650 Gas Units 1204 Mud Chlorides (mg/L) = Residual Cut stmg-bloom dul wh 149735 5016 144719 224 81500 280 108 172 221829 14742 207087 280 533 231 302 519 3 252 330 528 89 439 762 281 29 10229 Gas Units 1827 Mud Chlorides (mg/L) =81000 749 265 56 160442 4 209 267 81 186 Gas Units 1434 Mud Chlorides (mg/L) = 66 190 Hydrocarbon Ratios 91 626 588 695 48 647 687 125 562 842 9581 79000 335 168757 12163 156594 279 256 2 564 128 436 295 47 248 848 717 1334 Mud Chlorides (mg/L) =84000 14520 145922 233 Oil Show Rating Residual FlourescenceColor Amount 30% even dul pl straw/bnColor 1 Hydrocarbon Ratios 8354 Gas Units Cut wh 4008 4029 ENI Petroleum Interpretation: This interval displays a good oil show, but is not associated with anyproduciible hydrocarbons. It is dominated by unconsolidated, fine to very fine grain, subrounded to subangular, well sorted, quartz sand. It is slightly silty in part. Show Report Report # 7 SP24-SE1L1 7801 10275 Spy Island, AK none-fntAmountTypeStain Jade Miller Andrew Buchanan 3/29/2014 Odor brnColorColor ltIntensity IntensityAmountDistribution Color 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Yes Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Free Oil in Mud Intensity Color none lt brn wh Cut Fluorescence 731 13 718 929 240 5 235 437 Fluorescence Cuttings Analysis: 533 34 499 839 290 30 260 1391 11478 Gas Units 2619 Mud Chlorides (mg/L) = Residual Cut stmg-bloom dul wh 303848 109060 194788 376 77000 288 130 158 219617 1411 218206 304 556 4 552 495 3 140 914 571 358 213 3246 289 149 12312 Gas Units 1795 Mud Chlorides (mg/L) =78000 969 282 0 209297 4 282 271 0 271 Gas Units 2258 Mud Chlorides (mg/L) = 227 60 Hydrocarbon Ratios 75 772 895 964 446 518 834 0 834 1008 11853 78000 525 273446 204 273242 328 287 2 547 160 387 273 46 227 1286 847 1766 Mud Chlorides (mg/L) =81500 6054 203243 263 Oil Show Rating Residual FlourescenceColor Amount 30% even dul pl straw/bnColor 1 Hydrocarbon Ratios 10802 Gas Units Cut wh 4029 4030 ENI Petroleum Interpretation: This interval displays a good oil show, but is not associated with any producible hydrocarbons. Show Report Report # 8 SP24-SE1L1 10275 12749 Spy Island, AK none-fntAmountTypeStain Jade Miller Andrew Buchanan 3/29/2014 Odor brnColorColor ltIntensity IntensityAmountDistribution Color 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Yes Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Free Oil in Mud Intensity Color none lt brn wh Cut Fluorescence 738 41 697 1888 142 15 127 1016 Fluorescence Cuttings Analysis: 288 52 236 2284 143 38 105 1647 13713 Gas Units 2950 Mud Chlorides (mg/L) = Residual Cut stmg-bloom dul wh 342683 10033 332650 388 78000 225 93 132 245285 5489 239796 344 360 147 213 1012 3 202 973 458 116 342 2446 237 35 15110 Gas Units 2047 Mud Chlorides (mg/L) =80000 1437 179 29 326278 4 150 180 59 121 Gas Units 2248 Mud Chlorides (mg/L) = 90 136 Hydrocarbon Ratios 79 792 1626 940 82 858 788 216 572 1781 14156 79000 977 270966 55482 215484 377 226 2 438 115 323 228 34 194 2390 871 2760 Mud Chlorides (mg/L) =84000 10839 315439 398 Oil Show Rating Residual FlourescenceColor Amount 30% even dul pl straw/bnColor 1 Hydrocarbon Ratios 12942 Gas Units Cut wh 4009 4030 ENI Petroleum Interpretation: This interval displays a good oil show, but is not associated with any heavy hydrocarbon gases. Show Report Report # 9 SP24-SE1L1 12749 15225 Spy Island, AK none-fntAmountTypeStain Jade Miller Andrew Buchanan 3/29/2014 Odor brnColorColor ltIntensity IntensityAmountDistribution Color 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH SP24-SE1 & SP24-SE1 L1 Eni Petroleum MI Swaco Doyon 15 AK-XX-0901144926 Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++ 25-Feb 0 8.80 140 25 52 21/37/52 5.3 102/77/61/43/19/16 2/NA 2.0 /98 9.1 19.0 .05/.30 1100 68 circulating 26-Feb 752 9.00 112 28 35 23/50/60 6.1 91/63/51/38/22/17 2/NA 4.0 /96 0.25 0.15 9.6 23.0 .10/.30 2300 96 Drilling ahead 27-Feb 1568 9.20 119 30 37 24/52/64 5.1 97/67/54/39/24/19 2/NA 4.5 /96 0.20 0.20 9.6 25.0 .10/.40 2100 72 Drilling ahead 28-Feb 2834 9.30 80 28 30 19/44/59 5.8 86/58/47/34/18/14 /NA 4.5 /96 0.20 0.25 9.6 25.0 .15/.4 1800 36 Drilling ahead 1-Mar 2915 9.20 78 27 28 20/43/57 5.8 82/55/43/31/19/13 2/NA 4.5 /96 0.20 0.25 9.5 26.5 .15/.4 1300 36 Running casing 2-Mar 2915 9.20 49 15 12 4/9/11 6.0 42/27/17/11/4/3 2/NA 4.0 /96 0.20 0.20 9.3 24.0 .10/.35 1100 36 N/U BOP 3-Mar 2915 9.30 48 12 19 10/12/13 6.2 43/31/29/23/11/10 1/NA 3.0 2/95 -0.25 9.6 -.15/.80 800 40 M/U BHA 4-Mar 3310 9.20 53 13 21 11/13/15 5.6 47/34/31/24/13/10 2/NA 4.0 3/94 -0.35 9.9 2.0 .25/1.10 800 44 Drilling ahead 5-Mar 4422 9.30 53 13 13 12/20/23 5.1 52/39/34/26/14/10 2/NA 4.0 3/93 0.10 0.30 9.5 10.0 .15/.90 1100 48 Drilling ahead 6-Mar 5263 9.30 55 13 33 16/29/34 4.5 59/46/39/31/15/13 1/NA 5.0 3/92 0.15 0.35 10.0 14.0 .20/1.10 1300 40 BROOH 7-Mar 5263 9.30 48 13 27 15/28/35 4.7 53/40/35/27/14/11 1/NA 5.0 3/92 0.15 0.30 9.8 14.0 .15/1.00 1300 42 Change out TPR 8-Mar 5263 9.30 44 15 18 --48/33 ----------Condition Mud 9-Mar 5263 9.30 44 15 17 --47/32/23/17/7/6 ----------R/D BOP test equipment 10-Mar 5263 9.30 44 15 17 --47/32/23/17/7/6 ----------M/U BHA #4 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG 11-Mar 6084 9.25 46 15 16 8/8/8 4.9 46/31/25/19/8/7 NA/2 6.29 66/34 3.2 4.16 703 31.00 -2.32/59.12 2.8 Drill 8.75" Hole 12-Mar 8457 9.25 45 15 18 8/8/9 4.1 48/33/27/20/8/7 NA/1 6.25 66/34 2.9 3.77 763 31.47 -2.68/58.37 2.8 Drill 8.75" Hole 13-Mar 11018 9.3 46 15 17 8/8/9 4.7 47/32/27/19/8/7 NA/2 7.18 67/33 2.8 3.64 760 29.93 -4.97/64.96 2.8 Drill 8.75" Hole 14-Mar 13316 9.25 48 15 18 8/8/9 4.9 48/33/27/20/8/7 NA/1 7.83 69/31 2.65 3.45 761 30.61 -4.41/66.58 2.8 Drill 8.75" Hole 15-Mar 15240 9.25 48 15 17 8/8/8 4.9 47/32/26/18/8/7 NA/1 8.25 68/32 2.7 3.51 721 30.39 -8.26/66.58 2.8 BROOH 16-Mar 15240 9.25 48 15 19 8/8/8 4.8 49/34/27/20/8/7 NA/2 7.20 68/32 2.7 3.51 743 30.39 -4.29/65.95 2.8 BROOH 17-Mar 15240 9.25 46 15 16 7/8/8 4.9 46/31/25/18/7/6 NA/2 6.49 67/33 2.5 3.25 761 30.59 -4.25/59.01 2.8 BROOH 18-Mar 15240 9.25 46 15 16 7/8/8 -46/31/25/19/7/6 -6.56 67/33 2.5 3.25 763 30.21 -4.66/59.3 2.8 RIH w/5.5" Lnr. 19-Mar 5036 9.25 46 14 17 7/7/8 -45/31/25/18/7/6 -6.54 67/33 2.5 3.25 745 30.34 -4.52/59.2 2.8 Run Cmt. Logs 20-Mar 5080 9.35 49 14 16 7/7/8 -44/30/24/17/7/6 -7.64 67/33 2.4 3.12 692 30.42 -9.97/64.12 2.8 Mill casing window 21-Mar 5196 9.4 53 15 15 7/8/8 4.6 45/30/24/17/7/6 NA/1 7.69 67/33 2.15 2.8 618 30.15 -8.6/66.08 2.8 BROOH 22-Mar 5325 9.3 51 15 16 7/8/8 -46/31/25/17/7/6 NA/-7.25 67/33 2.35 3.06 613 29.53 -7.49/62.96 2.8 Drill 8.75" Hole 23-Mar 6396 9.25 53 16 19 7/8/8 4.6 51/35/27/19/7/6 NA/1 7.79 67/33 2.60 3.38 613 29.62 -6.89/68.88 2.8 Drill 8.75" Hole 24-Mar 9114 9.30 51 16 21 8/9/9 4.6 53/37/29/21/8/7 NA/1 7.62 67/33 2.45 3.19 656.0 30.55 -7.11/66.96 3 Drill 8.75" Hole 25-Mar 11706 9.30 52 17 22 8/9/9 4.6 56/39/32/23/8/7 NA/1 7.4 67/33 2.40 3.12 742.0 29.0 -5.7/65.85 3 Drill 8.75" Hole 26-Mar 13587 9.30 49 16 20 8/9/9 4.8 52/36/29/21/8/7 NA/1 7.2 67/33 2.25 2.93 725.0 30.1 -8.12/61.32 3 Drill 8.75" Hole 27-Mar 15056 9.30 49 17 20 7/8/8 4.2 54/37/31/22/7/6 NA/1 6.9 68/32 2.10 2.73 805.0 32.3 -7.74/59.16 3 Downlink MWD Exceed 28-Mar 15225 9.25 47 16 17 7/7/8 -49/33/27/19/7/6 NA/-7.25 69/31 2.40 3.12 880 31.98 -8.32/62.08 2.8 BROOH 29-Mar Casing Record SPUD:26-Feb-2014 SPERRY JOB:TD:27-Mar-2014 Remarks 20" Conductor @ 160' MD, 160' TVD 13.375" Casing @ 2900' MD, 2450' TVD 9.625" Casing @ 5237' MD, 3916' TVD WELL NAME:LOCATION:Spy Island OPERATOR:AREA:Nikaitchuq Field MUD CO:STATE:Alaska RIG: W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 2 130 1 Hughes MX-1 Mill Tooth 16.00 160 2915 2755 27.40 1.117 100.5 20 40 1700 750 1-1-WT-A-E-In-No-TD Surface Hole 3 200 2 Smith GF15B PDC 12.25 2915 5263 2348 29.20 1.117 80.4 25 40 1580 800 2-6-BT-G-E-2-WT-TD Intermediate Hole 4 300 3 Hycalog - SKH616M-E1D - PDC 8.75 5237 15240 10003 68.10 0.902 271.0 21.5 179 2080 566 1-1-CT-A-X-IN-NO-TD Production 7 400 4 Smith XR+CPS Mill Tooth 8.75 5136 5326 200 3.20 0.746 62.9 15 40 1550 450 1-1-WT-A-E-I-NO-BHA Kick off Whipstock 8 500 5 Hycalog - SKH616M-E1D - PDC 8.75 5326 15225 9899 70.00 0.902 267.4 5.9 175 2656 563 1-1-CT-A-X-IN-NO-TD Production WELL NAME:SP24-SE1 & SP24-SE1 L1 LOCATION:Spy Island OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO: SPERRY JOB:AK-XX-0901144926 TD:27-Mar-2014 MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:26-Feb-2014 B i t R e c o r d . . * 24 hr Recap:Pre-spud meeting. Flood conductor, located leak, drain and repair conductor. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1100.00 0 25-Feb-2014 12:00 AM Current Pump & Flow Data: 69 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 1 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: ConditionBit # 2 2.0 16Hughes MX-1 Mill Tooth 8.80 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 160' WOB EVEMAR Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Spud 5.30'52 Depth in / out YP (lb/100ft2) 9.10 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 SPUD PV Footage M.ROSS/O.AMEND ShClyst TuffGvlCoal cP 25 Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) 0' 0' 0' Max @ ft Current 0'0.0 Date: Time: Flood conductor, prime pumps, PT mud lines. No leaks, blow down top drive. M/U BHA. Establish clean out rates. in Minimum Depth C-5n 0.0 C-2 SPP (psi) Gallons/stroke TFABit Type Depth 19.0140 MBT 0' pH 1.117 0 0 0 Siltst 72 17 Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik/Jade Miller Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 1542 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik/Jade Miller 218 0 589 129 Units* Casing Summary Lithology (%) 0 MBT pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 23.0112 C-5n 753' 67.0 C-2 10 in 0Minimum Depth Time: Drilling ahead at a dept of 866'MD at time of report. 4 0' 842' 842' Max @ ft Current 646'12.7 Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 506.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J.KEENER/O.AMEND ShClyst TuffGvlCoal cP 28 Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 DRILLING AHEAD PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.60 000 Spud 6.1752'35 Depth in / out Mud Type Lst Type Average 2Background (max)Trip 9.30 Avg Min Comments RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 160' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 160' ConditionBit # 2 4.0 16Hughes MX-1 Mill Tooth 9.00 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 2 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 26-Feb-2014 12:00 AM Current Pump & Flow Data: 874 Max 0 Chlorides mg/l 2300.00 Clean-out conductor, P/U BHA02, drill ahead and survey every 15’ to 500’ MD to ensure safety from anti-collision. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Continuing to drill ahead in Surface section. Currently at a depth of 1713'MD at time of report. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 2100.00 0 27-Feb-2014 12:00 AM Current Pump & Flow Data: 936 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 3 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: ConditionBit # 2 4.5 16Hughes MX-1 Mill Tooth 9.20 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 160' WOB EVEMAR 9.30 Avg Min Comments RPM ECD (ppg) ml/30min 4Background (max)Trip Average Mud Type Lst Type Spud 5.11568'37 Depth in / out YP (lb/100ft2) 9.60 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 DRILLING AHEAD PV Footage J.KEENER/O.AMEND ShClyst TuffGvlCoal cP 30 Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 592.0 Flow In (gpm) Flow In (spm) 842' 1695' 853' Max @ ft Current 1096'27.0 Date: Time: 19 in 2Minimum Depth C-5n 1685' 67.0 C-2 83 SPP (psi) Gallons/stroke TFABit Type Depth 25.0119 MBT pH 1.117 0 0 0 Siltst 591 120 Units* Casing Summary Lithology (%) 02115 47 907-685-0772Unit Phone: 0 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik/Jade Miller Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 10919 . . * 24 hr Recap: (max)(current) 0 0 Cly 53737 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik/Jade Miller 13684 66 286 39 Units* Casing Summary Lithology (%) 0 MBT pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 25.080 C-5n 1944' 0.0 C-2 378 in 2Minimum Depth Time: 2915' MD and 2462' TVD @ 22:23. 103 1695' 2915' 854' Max @ ft Current 2638'46.0 Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 419.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J.KEENER/O.AMEND ShClyst TuffGvlCoal cP 28 Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 DRILLING AHEAD PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.60 000 Spud 5.82834'30 Depth in / out Mud Type Lst Type Average 15Background (max) Trip 9.30 Avg Min Comments RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 160' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 160' ConditionBit # 2 4.5 16Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 4 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 28-Feb-2014 12:00 AM Current Pump & Flow Data: 782 Max 0 Chlorides mg/l 100.00 F/2839' t/2869' encountered packing off and stuck pipe, pulled 40k over w/30K TQ. Continued to drill ahead to TD of Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:L/D BHA #2 as per SLB. Clean and clear rig floor. R/U to run 13 3/8" CSG. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1300.00 0 1-Mar-2014 12:00 AM Current Pump & Flow Data: 57 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 5 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 2 Bit # 2 4.5 16Hughes MX-1 Mill Tooth 9.20 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 16.6160' 2915' WOB EVEMAR Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average 724 Mud Type Lst Type 18.0 Spud 5.82915'28 Depth in / out YP (lb/100ft2) 9.50 000 00 CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 Running Casing PV 2755' Footage 27.50 J.KEENER/O.AMEND ShClyst TuffGvlCoal cP 27 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) 2915' 2915' 0' Max @ ft Current 0'0.0 Date: Time: Run casing as per detail t/1174'MD, in Minimum Depth C-5n 0.0 C-2 SPP (psi) Gallons/stroke TFABit Type Depth 26.578 L-80 MBT pH 1.117 0 0 0 Siltst 13 3/8" 35 7 Units* Casing Summary Lithology (%) 0 907-685-0772Unit Phone: 0 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik/Jade Miller Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 0 0 Cly . . * 24 hr Recap: (max)(current) BTC 0 0 Cly Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik/Jade Miller 13 3/8" 0 0 Units* Casing Summary Lithology (%) 0 L-80 MBT pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 24.048 C-5n 0.0 C-2 in Minimum Depth Time: 2915' 2915' 0' Max @ ft Current 0'0.0 Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J.KEENER/O.AMEND ShClyst TuffGvlCoal cP 15 2755' Footage 27.50 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 N/U BOPE PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 9.50 000 18.0 Spud 6.02915'12 Depth in / out Mud Type Lst Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 16.6160' 2915' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 2901' 160' Condition 1-1-WT-A-E-In-No-TD Bit # 2 4.0 16Hughes MX-1 Mill Tooth 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 6 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 2-Mar-2014 12:00 AM Current Pump & Flow Data: 35 Max 0 Chlorides mg/l 1100.00 Finish running casing, cement, NU BOPE Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) BTC 0 0 Cly Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman/Jade Miller 13 3/8" 0 0 Units* Casing Summary Lithology (%) 0 L-80 MBT pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 24.048 C-5n 0.0 C-2 in Minimum Depth Time: 2915' 2915' 0' Max @ ft Current 0'0.0 Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J.KEENER/O.AMEND ShClyst TuffGvlCoal cP 12 2755' 12.25 1.117 Footage 27.50 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 M/U BHA PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 9.60 000 18.0 Smith GF15B PDC Spud/LSND 6.22915'19 Depth in / out Mud Type Lst Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 16.6160' 2915' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 3 2901' 160' Condition 1-1-WT-A-E-In-No-TD Bit # 2 3.0 16Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 7 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 3-Mar-2014 12:00 AM Current Pump & Flow Data: 35 Max 0 Chlorides mg/l 800.00 Service rig. Test BOPE. Rig down BOPE equipment, pull test plug, install wear ring per Vetco Grey. M/U BHA Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Continue to M/U BHA #3. RIH t/1600' MD, shallow hole test. RIH t/2721' MD, perform CSG test @ 2500 psi. Drill out Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 800.00 0 4-Mar-2014 12:00 AM Current Pump & Flow Data: 1086 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 8 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.43 DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 2 4.0 16Hughes MX-1 Mill Tooth 9.20 Size 3 Sandstone: trnsl-trnsp-lt gy-brn-blk-gn, med-f gr, sb ang-sb rnd, mod srt, uncons, abd mic, abd pyr. 2901' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 16.6160' 2915' WOB EVEMAR 9.439.43 Avg Min Comments RPM ECD (ppg) ml/30min 4Background (max) Trip Average Mud Type Lst 100 Type 18.0 Smith GF15B PDC Spud/LSND 5.63310'21 Depth in / out YP (lb/100ft2) 9.90 000 00 CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 Drilling ahead PV 2755' 12.25 1.117 Footage 27.50 J.KEENER/O.AMEND ShClyst TuffGvlCoal cP 13 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: 839.0 Flow In (gpm) Flow In (spm) 2915' 3465' 550' Max @ ft Current 3323'164.0 Date: Time: 15 in 2 3384'Minimum Depth C-5n 3079' 49.0 C-2 35 SPP (psi) Gallons/stroke TFABit Type Depth 2.053 L-80 MBT pH 1.117 0 0 0 Siltst 13 3/8" 735 161 Units* Casing Summary Lithology (%) 01615 169 907-685-0772Unit Phone: 0 Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman/Jade Miller Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 0 0 Cly 4421 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 2433 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman/Jade Miller 10 1615 291 13 3/8" 735 161 Units* Casing Summary Lithology (%) 0 L-80 MBT pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 10.053 C-5n 4264' 0.0 C-2 19 in 2 4295'Minimum Depth Time: 7 3465' 4554' 1089' Max @ ft Current 4027'137.0 Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: 783.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J.KEENER/R. WIMMER ShClyst TuffGvlCoal cP 13 2755' 12.25 1.117 Footage 27.50 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 Drilling ahead PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 9.50 000 18.0 Smith GF15B PDC LSND 5.14422'26 Depth in / out Mud Type Lst 90 Type Average 4Background (max) Trip 9.519.73 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 16.6160' 2915' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 3 Sandstone: trnsl-trnsp-clr-lt gy-brn-blk-gn, med-f gr, sb ang-sb rnd, mod srt, uncons, abd mic, tr pyr, sli slty, r c ctgs. 2901' 160' Condition 1-1-WT-A-E-In-No-TD Bit # 2 4.0 16Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.94 DOYON15 Report For: Morning Report Report # 9 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 5-Mar-2014 12:00 AM Current Pump & Flow Data: 1239 Max 0 Chlorides mg/l 1100.00 Continue to drill ahead from 3465' MD to 4554' MD. The max gas observed was 19 units at 4264' MD Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill from 4554' MD to 5263' MD, TD intermediate section. The max gas observed was 400 units at 4842' MD. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1300.00 11 6-Mar-2014 12:00 AM Current Pump & Flow Data: 1650 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 10 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.08 DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 2 5.0 16Hughes MX-1 Mill Tooth 9.30 Size 3 Sandstone: trnsl-trnsp-lt gry-dk gry-brn-blk-tn, med-vf gr, sb ang-sb rnd, mod srt, uncons, r mic, tr pyr, slty. 2901' 160' 100% Gas In Air=10,000 UnitsConnection 33 Tools API FL Chromatograph (ppm) 16.6160' 2915' WOB EVEMAR 9.619.87 Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average 62 Mud Type Lst 70 Type 18.0 Smith GF15B PDC LSND 4.55263'33 Depth in / out YP (lb/100ft2) 10.00 000 00 CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 48 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 BROOH PV 2755' 12.25 1.117 Footage 27.50 J.KEENER/R. WIMMER ShClyst TuffGvlCoal cP 13 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: 255.5 Flow In (gpm) Flow In (spm) 4554' 5263' 709' Max @ ft Current 4726'94.9 Date: Time: 64 in 2 5048'Minimum Depth C-5n 4842' 0.0 C-2 400 SPP (psi) Gallons/stroke TFABit Type Depth 14.055 L-80 MBT pH 1.117 0 0 0 Siltst 13 3/8" 852 172 Units* Casing Summary Lithology (%) 0 30 8056 582 907-685-0772Unit Phone: 0 Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman/Jade Miller Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 248 0 Cly 54559 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman/Jade Miller 0 0 13 3/8" Units* Casing Summary Lithology (%) 0 L-80 MBT pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 14.048 C-5nC-2 in Minimum Depth Time: 5263' 5263' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J.KEENER/R. WIMMER ShClyst TuffGvlCoal cP 13 2755' 12.25 1.117 Footage 27.50 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 Change out TPR PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 9.80 000 18.0 Smith GF15B PDC LSND 4.75263'27 Depth in / out Mud Type Lst Type Average 84Background (max) Trip 9.619.87 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 16.6160' 2915' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 3 2901' 160' Condition 1-1-WT-A-E-In-No-TD Bit # 2 5.0 16Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.08 DOYON15 Report For: Morning Report Report # 11 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 7-Mar-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 1300.00 BROOH 4700' MD to 2900' MD. POOH, lay down BHA #3 and clean rig floor. Max trip gas observed 84u. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:R/U Test equipment, R/D Test equipment, pull test plug and set wear ring, RIH with 9 5/8" casing, set casing at Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 0 8-Mar-2014 12:00 AM Current Pump & Flow Data: Max 2-6-BT-G-E-2-WT-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 12 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 1 16Hughes MX-1 Mill Tooth 9.30 Size 2 gas 61u. 2901' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 25 16.6160' 2915' WOB EVEMAR Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average 61u Mud Type Lst HYDRIL Type 40 18.0 Smith GF15B PDC LSND 2915' 5263'18 5263' Depth in / out YP (lb/100ft2) 000 00 CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 Condition Mud PV 2755' 12.25 1.117 Footage 29.20 2348' 27.50 J.KEENER/R. WIMMER ShClyst TuffGvlCoal cP 15 40.0 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 5263' 5263' 0' Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 44 L-80 MBT pH 1.117 0 0 0 Siltst 13 3/8" Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman/Jade Miller Set AtSize 178.9 X-65 Grade L-80 20.00'' 9 5/8'' (max)(current) BTC 0 0 Cly 0 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade L-805237' 20.00'' 9 5/8'' 907-685-0772Unit Phone: 0 Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman/Jade Miller 0 0 13 3/8" Units* Casing Summary Lithology (%) 0 L-80 MBT pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 44 C-5nC-2 in Minimum Depth Time: 5263' 5263' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) J.KEENER/R. WIMMER ShClyst TuffGvlCoal cP 15 2755' 12.25 1.117 Footage 29.20 2348' 27.50 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 R/D BOP test equip PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 000 40 18.0 Smith GF15B PDC LSND 2915' 5263'17 5263' Depth in / out Mud Type Lst HYDRIL Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 25 16.6160' 2915' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 2 2901' 160' Condition 1-1-WT-A-E-In-No-TD Bit # 1 16Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 13 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE 2-6-BT-G-E-2-WT-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 9-Mar-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l Pumped cement, Injectivity test, R/D cementt equipment and clean rig floor. N/D BOP stack, cut casing, N/U BOP Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade L-805237' 20.00'' 9 5/8'' 907-685-0772Unit Phone: 0 Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman/Jade Miller 0 0 13 3/8" Units* Casing Summary Lithology (%) 0 L-80 MBT pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 44 C-5nC-2 in Minimum Depth Time: 5263' 5263' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) J.KEENER/R. WIMMER ShClyst TuffGvlCoal cP 15 2348' 8.75 0.902 Footage 29.20 Ss (ppb Eq) C-1 C-5i AK-AM-0901144926 M/U BHA #4 PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 000 40 Hycalog - SKH616M-E1D - PDC LSND 5237' 5263'17 Depth in / out Mud Type Lst HYDRIL Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 252915' 5263' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 3 2901' 160' Condition 2-6-BT-G-E-2-WT-TD Bit # 2 12.25Smith GF15B PDC 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 14 Customer: Well: Area: Location: Rig: SP24-SE1 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 10-Mar-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l Pull test plug and set wear ring. Clean rig floor. P/U 5" DP and R/U test equipment, test 9-5/8" casing. P/U BHA Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Jade Miller (max)(current) BTC Cly Depth in / out L-805237' Bit Type RPM 40 907-685-0772Unit Phone: 49 Kori Jo Plowman Set AtSize 178.9 X-65 Grade 291 C-2 Gas Summary 120 169 0 135 107480 0 0 56640 862 5469'Minimum Depth 13 3/8" Maximum in 3 6355' 0 197 113 435 458 Alkal Coal Gallons/stroke L-80 0 5263' 6363' 1100' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 95 SPP (psi) Max @ ft 6030' Date: Time: API FL Depth 0' Avg to 0' Current 200.70.0 (current) Units* ClystSs Cht Silt Casing Summary Lithology (%) 1.117 1546 2348' 8.75 0.902 Footage 40.0 Drill 8.75" Hole PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Oil / Water Hours 0 Cement C-1 C-5i ShSiltst Chromatograph (ppm) 425 203 33139 C-4i C-4n 83 Lst 100 HYDRIL (lb/100ft2) 9.25 Type 16 Hycalog - SKH616M-E1D - PDC Mud (lb/bbl)ml/30min 4.163.20 25 C-3 Average Trip (max) 253 Comments 76Background 2901' 100% Gas In Air=10,000 UnitsConnection fluor, blmg brt blwh ct fluor, lt amb ct, hvy lt amb res, brt blwh res fluor. SST : trnsl-trnsp-dk gry-brn-blk-gn, f-vf gr, sb ang-sb rnd, w srt, uncons, tr glauc, r pyr, sli slty, SHOW: no stn, 100% even brt blwh Bit # 2 12.25 2915' 3 5237' 29.20 Size 160'EVEMAR 5263' WOB Smith GF15B PDC TFA Condition 2-6-BT-G-E-2-WT-TD MWD Summary 96% %Mud Type FAZEPRO NA Ratio Mud Data Depth 1.9 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 6084'6.3 9.85 10.70 Cor Solids 10.40 Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 226.1 Morning Report Report # 15 Customer: Well: Area: Location: Rig: SP24-SE1 11-Mar-2014 12:00 AM AK-AM-0901144926 1197 ROP ROP (ft/hr) J.KEENER/R. WIMMER 24 hr Max Cont. P/U BHA #4. RIH w/5"DP, shallow hole test, log CSG collars. Displace f/LSND to OBM. Cut and slip drill line, Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Cly HYDRIL Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Jade Miller (max)(current) BTC Bit Type RPM 40 Hours 907-685-0772Unit Phone: 62 Kori Jo Plowman Set AtSize 178.9 X-65 Grade 10 1840 C-2 Gas Summary 1225 107 203 28 124 151528 18 18 88365 6558'Minimum Depth 13 3/8" Maximum in 8 7973' 35 228 142 576 SST: trnsl-trnsp-dk gry-brn-blk-gn-tn, f-vf, sb ang-sb rnd, w srt, uncons, tr mic, sli slty, SHOW: lt brn stn, 80% even dull wh fluor, strmg dull blwh ct fluor, pl straw ct, clr res, dull wh res fluor. 546 Alkal Coal Gallons/stroke L-80 18 6363' 8732' 2369' Lime TuffGvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 110 SPP (psi) Max @ ft 8233' Date: Time: API FL Depth 0' Avg to 0' Current 265.0293.0 (current) Units* ClystSs Cht Silt Lithology (%) 1.117 1545 2348' 8.75 0.902 Footage 40.0 Depth in / out Drill 8.75" Hole PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Oil / Water 43 Cement C-1 C-5i ShSiltst C-4n Chromatograph (ppm) 633 241 38123 C-4iC-3 Bit # 88 Lst 90 25 (lb/100ft2) 9.25 Type 18 Hycalog - SKH616M-E1D - PDC Casing Summary L-805237' Mud (lb/bbl)ml/30min 3.772.90 (max) 336Average Comments 44Background Trip 2901' 100% Gas In Air=10,000 UnitsConnection 2 12.25 2915' 3 5237' 29.20 2-6-BT-G-E-2-WT-TD Size 160'EVEMAR 5263' WOB Smith GF15B PDC TFA Condition MWD Summary 96% %Mud Type FAZEPRO NA Ratio Mud Data Depth 66/34 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 8457'6.3 9.94 10.88 Cor Solids 10.52 Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 411.0 Morning Report Report # 16 Customer: Well: Area: Location: Rig: SP24-SE1 12-Mar-2014 12:00 AM AK-AM-0901144926 1906 ROP ROP (ft/hr) M.ROSS/R. WIMMER 24 hr Max Drilling ahead from 6363' MD to 8732' MD. Max gas observed 1225u. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 2304 ROP ROP (ft/hr) M.ROSS/R. WIMMER 24 hr Max Morning Report Report # 17 Customer: Well: Area: Location: Rig: SP24-SE1 13-Mar-2014 12:00 AM AK-AM-0901144926ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 374.1 11.40 Cor Solids 11.00 Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 11018'7.2 2.84 Mud Type FAZEPRO 4.7 Ratio Mud Data Depth 67/33 Size 160'EVEMAR 5263' WOB Smith GF15B PDC TFA Condition 3 5237' 29.20 2-6-BT-G-E-2-WT-TD Drilling ahead from 8732' MD to 11366' MD. Max gas observed 1344u. Trip 2901' 100% Gas In Air=10,000 UnitsConnection65Background (max) 343Average Mud (lb/bbl)ml/30min 3.642.809.30 Type 17 Hycalog - SKH616M-E1D - PDC Casing Summary L-805237' 2 12.25 2915' C-3 Bit # 107 Lst 100 52154 C-4i Chromatograph (ppm) 635 197 24 Cement C-1 C-5i ShSiltst Drill 8.75" Hole PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Oil / Water Lithology (%) 1.117 1546 2348' 8.75 0.902 Footage 40.0 Depth in / out ClystSs Cht Silt C-4n Depth 0' Avg to 0' Current 296.0179.0 MWD Summary Max @ ft 10887' Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 112 SPP (psi) 25 (lb/100ft2) Comments 8732' 11366' 2634' Lime TuffGvl 96% % 556 Alkal Coal Gallons/stroke L-80 644 yel fluor, strmg dull wh ct fluor, pl straw ct, pl straw res, dull wh res fluor. SST : trns-trnsp-dk gry-brn-blk-gn-tn, f-vf gr, sb ang-sub rnd, mod srt, uncons, tr glauc, r sh frag, slty SHOW: lt brn stn, 80% even fnt 10600' 20 198 128 010498'Minimum Depth 13 3/8" Maximum in 10 13 80527 135 176 16 137 168328 242631 C-2 Gas Summary 1344 907-685-0772Unit Phone: 52 Kori Jo Plowman Set AtSize 178.9 X-65 Grade Bit Type RPM 40 Hours (current) Units* Cly HYDRIL Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Jade Miller (max)(current) BTC . . * 24 hr Recap: Cly HYDRIL Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Jade Miller (max)(current) BTC Bit Type RPM 40 Hours 907-685-0772Unit Phone: 52 Kori Jo Plowman Set AtSize 178.9 X-65 Grade Gas Summary 1555 (current) Units* 194658 749766 C-2 32 21142 46 2012997'Minimum Depth 13 3/8" Maximum in 11 12048' 45 195 121 L-80 398 50% even dull yel fluor, strmg dull wh ct fluor, pl straw ct, wh res, fnt wh res fluor. SST : trns-trnsp-dk gry-brn-blk-gn-tn, f-vf gr, sb ang-sub rnd, w srt, uncons, com glauc, com mic, slty frag, slty SHOW: lt brn stn, % 546 Alkal Coal Gallons/stroke Comments 11366' 13718' 2352' Lime TuffGvl 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 110 SPP (psi) Depth 0' Avg to 0' Current 328.1215.0 MWD Summary ClystSs Cht Silt C-4n Lithology (%) 1.117 1548 2348' 8.75 0.902 Footage 40.0 Depth in / out Drill 8.75" Hole PV cP 68.0 Weight Flow In (gpm) Flow In (spm) 52 Cement C-1 C-5i ShSiltst 71 C-4i 59 173 43 Lst 100 Chromatograph (ppm) 630 185 Type 18 Hycalog - SKH616M-E1D - PDC Casing Summary L-805237' 2 12.25 2915' Bit # Mud (lb/bbl)ml/30min 3.452.65 (max) 111Average 123Background 2901' 100% Gas In Air=10,000 UnitsConnection C-3 Drilling ahead from 11366' MD to 13718' MD. Max gas observed 1555u. Trip 3 5237' 29.20 2-6-BT-G-E-2-WT-TD25 Size 160'EVEMAR 5263' WOB Smith GF15B PDC TFA Condition Mud Type FAZEPRO 4.9 Ratio Mud Data Depth 69/319.25 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 13316'7.8 7.97 11.48 Cor Solids 11.11 Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 429.1 Morning Report Report # 18 Customer: Well: Area: Location: Rig: SP24-SE1 14-Mar-2014 12:00 AM AK-AM-0901144926 2442 ROP ROP (ft/hr) M.ROSS/R. WIMMER 24 hr Max Max @ ft 13555' 60 26 Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 42 16 12:00 AM AK-AM-0901144926 2517 ROP ROP (ft/hr) M.ROSS/R. WIMMER 24 hr Max Max @ ft 14816'387.9 Morning Report Report # 19 Customer: Well: Area: Location: Rig: SP24-SE1 15-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 133.00 Cor Solids 11.63 Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15196'8.3 10.88 Mud Type FAZEPRO 4.9 Ratio Mud Data Depth 2.19.25 Oil / Water (lb/100ft2) 5263' WOB Smith GF15B PDC TFA Condition 2-6-BT-G-E-2-WT-TD25 Size 160'EVEMAR Drilling ahead from 13718' MD to 15240' MD. Monitered well for 10 mins and begin BROOH Max gas observed Trip 3 5237' 100% Gas In Air=10,000 UnitsConnection C-3 26Background (max) 271Average Mud (lb/bbl)ml/30min 3.512.7017 Hycalog - SKH616M-E1D - PDC Casing Summary L-805237' 2 12.25 2915' Bit # 2901' Chromatograph (ppm) 625 124 64 C-4i 55 122 43 55 Cement C-1 C-5i ShSiltst Lst BROOH PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Lithology (%) 1.117 1548 2348' 8.75 0.902 Footage 40.0 Depth in / out ClystSs Cht Silt 100 0' Avg to 0' Current 237.70.0 MWD Summary Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 110 SPP (psi) Comments 13718' 15240' 1522' Lime TuffGvl 96% % 541 Alkal Coal Gallons/stroke L-80 537 60% pchy fnt yel fluor, strmg dull wh ct fluor, pl straw ct, clr res, fnt wh res fluor. SST : trns-trnsp-dk gry-brn-blk-gn-tn, f-vf gr, sb ang-sub rnd, w srt, uncons, com glauc, com mic, sli slty SHOW: lt brn stn, 14851' 53 135 88 14209'Minimum Depth 13 3/8" Maximum in 8 Depth 27 72452 53 190246 608458 C-2 23 C-4n Gas Summary 1526 (current) Units* 907-685-0772Unit Phone: 37 Kori Jo Plowman Set AtSize 178.9 X-65 Grade Bit Type RPM 40 Hours 29.20 Cly HYDRIL Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Jade Miller (max)(current) BTC . . * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Jade Miller (max)(current) BTC 40 Hours 29.20 Cly HYDRIL 907-685-0772Unit Phone: 0 Kori Jo Plowman Set AtSize 178.9 X-65 Grade Gas Summary (current) Units* 0 00 C-2 0 C-4n 0 0 0 Minimum Depth 13 3/8" Maximum in Depth 0 0 0 L-80 % 548 Alkal Coal Gallons/stroke Comments 15240' 15240' 0' Lime TuffGvl 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 110 SPP (psi) 0' Avg to 0' Current MWD Summary Ss Cht Silt Lithology (%) 1.117 1548 2348' 8.75 0.902 Footage 40.0 Depth in / out BROOH PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i 0 0 0 0 Chromatograph (ppm) 0 0 5237' 2 12.25 2915' Bit # 2901' Bit Type 62 Mud (lb/bbl)ml/30min 3.512.70 (max) 0Average Background 100% Gas In Air=10,000 UnitsConnection C-3 Continue to BROOH from 15170' MD t/9168' MD. The max trip gas observed was 62 units. Trip 3 5237' 25 Size 160'EVEMAR Hycalog - SKH616M-E1D - PDC Casing Summary L-80 5263' WOB Smith GF15B PDC TFA Condition 2-6-BT-G-E-2-WT-TD 19 RPM Mud Type FAZEPRO - Ratio Mud Data Depth 68/329.25 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15240'7.2 Cor Solids Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Morning Report Report # 20 Customer: Well: Area: Location: Rig: SP24-SE1 16-Mar-2014 12:00 AM AK-AM-0901144926 1885 ROP ROP (ft/hr) M.ROSS/R. WIMMER 24 hr Max Max @ ft 0 00 Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 0 00 12:00 AM AK-AM-0901144926 1542 ROP ROP (ft/hr) M.ROSS/R. WIMMER 24 hr Max Max @ ft Morning Report Report # 21 Customer: Well: Area: Location: Rig: SP24-SE1 17-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 12.83 Cor Solids 10.38 Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15240'6.5 9.71 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.25 Oil / Water (lb/100ft2) 5263' WOB Smith GF15B PDC TFA Condition 2-6-BT-G-E-2-WT-TD 16 RPM 25 Size 160'EVEMAR Hycalog SKH616M-E1D PDC Casing Summary L-80 BROOH f/9168' MD t/5237' MD. @ 5450' MD observed shale beds, work through shale as per K&M. The max trip Trip 3 5237' 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min 3.252.50 (max) 0 C-3 2901' Bit Type 18 Chromatograph (ppm) 0 0 0 0 0 0 Cement C-1 C-5i ShSiltst LstClyst C-4i BROOH PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 46 2348' 8.75 0.902 Footage 40.0 Depth in / out 5237' 12.25 2915' Ss Cht Silt Avg to 0' Current MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 110 SPP (psi) 15240' 15240' 0' Lime TuffGvl 96% Date: % 548 Alkal Coal Gallons/stroke 0 0 0 Minimum Depth 13 3/8" Maximum in Lithology (%) 2 Bit # 0 0 Depth 0' 1.117 15 0 C-2 0 C-4n 0 Gas Summary (current) Units* 907-685-0772Unit Phone: 0 Kori Jo Plowman Set AtSize 178.9 X-65 Grade 40 Hours 29.20 Cly HYDRIL L-80 Comments Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Jade Miller (max)(current) BTC 0 0 . . * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Jade Miller (max)(current) BTC 0 0 179 40 Hours 29.20 Cly HYDRIL L-80 Comments 907-685-0772Unit Phone: 0 Kori Jo Plowman Set AtSize 178.9 X-65 Grade Gas Summary (current) Units* 0 C-2 0 C-4n 0 0 0 Depth 0' 1.117 15 Minimum Depth 13 3/8" Maximum in Lithology (%) 2 Bit # 0 0 0 % Alkal Coal Gallons/stroke 15240' 15240' 0' Lime TuffGvl 1-1-CT-A-X-IN-NO-TD 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) Avg to 0' Current MWD Summary Ss Cht Silt 2348' 8.75 0.902 Footage 40.0 Depth in / out 5237' 12.25 2915' 15240' RIH w/5.5" Lnr. PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i 0 0 0 0 Chromatograph (ppm) 0 0 2901' Bit Type 12 Mud (lb/bbl)ml/30min 3.252.50 (max) 0 C-3 Average Background 100% Gas In Air=10,000 UnitsConnection BROOH and circulate bottoms up. POOH f/2539' MD t/392' MD. L/D BHA #4. Clean rig floor. R/U to run liner, upload Trip 3 5237'68.10 10003' 22 25 Size 160'EVEMAR Hycalog SKH616M-E1D PDC Casing Summary L-80 5263' WOB Smith GF15B PDC TFA Condition 2-6-BT-G-E-2-WT-TD 16 RPM 46 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.25 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15240'6.6 9.94 10.20 Cor Solids 10.06 Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Morning Report Report # 22 Customer: Well: Area: Location: Rig: SP24-SE1 18-Mar-2014 12:00 AM AK-AM-0901144926 34 ROP ROP (ft/hr) M.ROSS/O. AMEND 24 hr Max Max @ ft 0 00 Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 0 00 12:00 AM AK-AM-0901144926 34 ROP ROP (ft/hr) R. WIMMER/O. AMEND 24 hr Max Max @ ft Morning Report Report # 23 Customer: Well: Area: Location: Rig: SP24-SE1 19-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 10.20 Cor Solids 10.06 Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 5036'6.6 9.94 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.25 Oil / Water (lb/100ft2) 5263' WOB Smith GF15B PDC TFA Condition 2-6-BT-G-E-2-WT-TD 17 RPM 46 22 25 Size 160'EVEMAR Hycalog SKH616M-E1D PDC Casing Summary L-80 Finish running liner and lay down liner tools. R/U e-line, RIH and coralate for logs. Trip 3 5237'68.10 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min 3.252.50 (max) 0 C-3 Bit Type 10003' Chromatograph (ppm) 0 0 0 0 0 0 Cement C-1 C-5i ShSiltst LstClyst C-4i Run Cmt. Logs PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 8.75 0.902 Footage 40.0 Depth in / out 5237' 12.25 2915' 15240' 2901' Ss Cht Silt Avg to 0' Current MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) 15240' 15240' 0' Lime TuffGvl 1-1-CT-A-X-IN-NO-TD 96% Date: % Alkal Coal Gallons/stroke 0 0 0 Minimum Depth 13 3/8" Maximum in Lithology (%) 2 Bit # 0 0 Depth 0' 1.117 14 0 C-2 0 C-4n 0 Gas Summary (current) Units* 907-685-0772Unit Phone: 0 Kori Jo Plowman Set AtSize 178.9 X-65 Grade 179 40 Hours 29.20 Cly HYDRIL L-80 Comments 2348' Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Paul Kalenuik (max)(current) BTC 0 0 . . * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Paul Kalenuik (max)(current) BTC 0 0 179 Hours 68.10 Cly HYDRIL L-80 Comments 10003' 907-685-0772Unit Phone: 0 Kori Jo Plowman Set AtSize 178.9 X-65 Grade Gas Summary (current) Units*C-2 0 C-4n 0 0 0 Depth 0' 0.902 14 0Minimum Depth 13 3/8" Maximum in Lithology (%) 3 Bit # 0 0 0 % 495 Alkal Coal Gallons/stroke 15240' 15240' 0' Lime TuffGvl 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 107 SPP (psi) Avg to 0' Current MWD Summary Ss Cht Silt Footage 40.0 Depth in / out 5237' 8.75 5237' 2901' Mill casing window PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i 0 0 0 0 Chromatograph (ppm) 0 0 6 Mud (lb/bbl)ml/30min 3.122.40 (max) 0 C-3 Average Background 100% Gas In Air=10,000 UnitsConnection Continue e-line logging. R/D wireline. R/U BHA #5 and RIH t/TOL, tag @5136' MD. POOH and L/D BHA. M/U upper/ Trip observed. 4 22 Size 160' EVEMARCasing Summary L-80 Bit Type 15240' WOB Hycalog SKH616M-E1D PDC TFA Condition 1-1-CT-A-X-IN-NO-TD 16 RPM 49 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.35 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 5080'7.6 Cor Solids Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Morning Report Report # 24 Customer: Well: Area: Location: Rig: SP24-SE1 20-Mar-2014 12:00 AM AK-AM-0901144926 1086 ROP ROP (ft/hr) R. WIMMER/O. AMEND 24 hr Max Max @ ft 0 00 Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 0 00 12:00 AM AK-AM-0901144926 80 ROP ROP (ft/hr) R. WIMMER/O. AMEND 24 hr Max Max @ ft 5244'150.0 Morning Report Report # 25 Customer: Well: Area: Location: Rig: SP24-SE1 21-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Cor Solids Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 5196'7.7 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.40 Oil / Water (lb/100ft2) 15240' WOB Hycalog SKH616M-E1D PDC TFA Condition 1-1-CT-A-X-IN-NO-TD 15 RPM 53 22 Size 160' EVEMAR Smith XR+CPS Mill tooth Casing Summary L-80 Bit Type Mill 8.75" window in casing and 28' of rathole to 5126' MD. R/U and perform FIT to 13.0ppg @ 5034' MD. POOH, L/D Trip 4 5126' SST: trnsl-trnsp-lt gry-dk gry-brn-blk-gn, med-vf gr, sb ang-sb rnd, ply srt, uncons, r mic, r pyr, sli slty, SHOW: no stn, tr pp fnt fluor, 100% Gas In Air=10,000 UnitsConnection Average 11Background Mud (lb/bbl)ml/30min 2.802.15 (max) 0 C-3 Chromatograph (ppm) 9 0 0 0 0 0 Cement C-1 C-5i ShSiltst LstClyst C-4i BROOH PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5237' 2901' Ss Cht Silt 80 Avg to 0' Current 78.50.0 MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 0 SPP (psi) 5126' 5326' 200' Lime TuffGvl 96% Date: % 0 Alkal Coal Gallons/stroke 22 fnt wh ct fluor, no res. 5192' 0 0 0 Minimum Depth 13 3/8" Maximum in 6 Lithology (%) 3 Bit # 1538 0 5170' Depth 0' 0.902 15 629 C-2 0 C-4n 0 Gas Summary 41 20(current) Units* 907-685-0772Unit Phone: 0 Kori Jo Plowman Set AtSize 178.9 X-65 Grade 179 Hours 68.10 Cly HYDRIL L-80 Comments 10003' Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Paul Kalenuik (max)(current) BTC 4596 0 . . * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Paul Kalenuik (max)(current) BTC 0 0 179 Hours 68.10 Cly HYDRIL L-80 Comments 10003' 907-685-0772Unit Phone: 0 Kori Jo Plowman Set AtSize 178.9 X-65 Grade Gas Summary (current) Units*C-2 0 C-4n 0 0 0 Depth 0' 0.902 15 0Minimum Depth 13 3/8" Maximum in Lithology (%) 3 Bit # 0 0 0 % 0 Alkal Coal Gallons/stroke 5326' 5326' 0' Lime TuffGvl 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 0 SPP (psi) Avg to 0' Current MWD Summary Ss Cht Silt 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5237' 2901' M/U BHA #8 PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i 0 0 0 0 Chromatograph (ppm) 0 0 27 Mud (lb/bbl)ml/30min 3.062.35 (max) 0 C-3 Average Background 100% Gas In Air=10,000 UnitsConnection POOH and lay down BHA #7. Rig up BOP test equipment. Test BOP's. Rig down BOP test equipment. Begin to Trip 4 5126' 22 Size 160' EVEMAR Smith XR+CPS Mill tooth Casing Summary L-80 Bit Type 15240' WOB Hycalog SKH616M-E1D PDC TFA Condition 1-1-CT-A-X-IN-NO-TD 16 RPM 51 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.30 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 5325'7.3 Cor Solids Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Morning Report Report # 26 Customer: Well: Area: Location: Rig: SP24-SE1 22-Mar-2014 12:00 AM AK-AM-0901144926 35 ROP ROP (ft/hr) M. ROSS/O. AMEND 24 hr Max Max @ ft 0 00 Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 125 57206 12:00 AM AK-AM-0901144926 1849 ROP ROP (ft/hr) M. ROSS/O. AMEND 24 hr Max Max @ ft 5741'462.0 Morning Report Report # 27 Customer: Well: Area: Location: Rig: SP24-SE1 23-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 10.86 Cor Solids 10.39 Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 6396'7.8 9.73 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.25 Oil / Water (lb/100ft2) 5326' WOB Smith XR+CPS Mill tooth TFA Condition 19 RPM 53 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type Rig up BHA #8. RIH to 1500' MD and perform shallow hole test. RIH to 5060' MD. Cut and slip drill line, service rig. Trip 5 5126' 100% Gas In Air=10,000 UnitsConnection Average 112Background Mud (lb/bbl)ml/30min 3.382.60 (max) 300 C-3 Chromatograph (ppm) 570 285 172 225 0 0 Cement C-1 C-5i ShSiltst LstClyst C-4i Drill 8.75" hole PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 2901' Ss Cht Silt 100 Avg to 0' Current 279.0166.0 MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 110 SPP (psi) 5326' 6830' 1504' Lime TuffGvl 96% Date: % 546 Alkal Coal Gallons/stroke 635 SST: trnsl-trnsp-gry-brn-blk-gn, f-v f gr, sb rnd-rnd, wl srt, uncons, tr glauc, tr mic, slislty, SHOW: tr lt brn stn, 50% even dull yel fluor, strmg brt yel-wh cut fluor, pl straw ct, pl straw res, dull wh res fluor. 6126' 0 250 128 Minimum Depth 13 3/8" Maximum in 5 Lithology (%) 4 Bit # 52665 172 5328' Depth 0' 0.746 16 243 C-2 0 C-4n 0 Gas Summary 1154 (current) Units* 907-685-0772Unit Phone: 54 Kori Jo Plowman Set AtSize 178.9 X-65 Grade 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Paul Kalenuik (max)(current) BTC 147271 0 . . * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Kori Jo Plowman/Paul Kalenuik (max)(current) BTC 171002 0 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' 907-685-0772Unit Phone: 112 Kori Jo Plowman Set AtSize 178.9 X-65 Grade Gas Summary 1415 (current) Units*C-2 0 C-4n 0 101317 208 8420' Depth 0' 0.746 16 118Minimum Depth 13 3/8" Maximum in 14 Lithology (%) 4 Bit # 7409' 0 324 201 804 SST: trnsl-trnsp-gry-brn-blk-gn, f-v f gr, sb ang-sb rnd, wl srt, uncons, abd mic, r pyr, sli slty, SHOW: lt brn stn, 90% even brt wh fluor, strmg brt blwh cut fluor, pl straw ct, pl straw res, brt blwh res fluor. % 541 Alkal Coal Gallons/stroke 6830' 9493' 2663' Lime TuffGvl 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 109 SPP (psi) Avg to 0' Current 277.70.0 MWD Summary Ss Cht Silt 100 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 2901' Drill 8.75" hole PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i 197 285 0 0 Chromatograph (ppm) 733 326 Mud (lb/bbl)ml/30min 3.192.45 (max) 491 C-3 Average 115Background 100% Gas In Air=10,000 UnitsConnection Drill from 6830' MD to 9493' MD. The max gas observed was 1415 units at 7409' MD. Trip 5 5126' 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type 5326' WOB Smith XR+CPS Mill tooth TFA Condition 21 RPM 51 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.30 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 9114'7.6 10.42 11.24 Cor Solids 10.83 Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 491.7 Morning Report Report # 28 Customer: Well: Area: Location: Rig: SP24-SE1 24-Mar-2014 12:00 AM AK-AM-0901144926 2068 ROP ROP (ft/hr) M. ROSS/O. AMEND 24 hr Max Max @ ft 7489' 161 74232 Density (ppg) out (sec/qt) Viscosity . #. * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 66 67206 12:00 AM AK-AM-0901144926 2068 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft 7489'491.7 Morning Report Report # 29 Customer: Well: Area: Location: Rig: SP24-SE1 25-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 11.50 Cor Solids 11.49 Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 9114'7.4 11.39 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.30 Oil / Water (lb/100ft2) 5326' WOB Smith XR+CPS Mill tooth TFA Condition 22 RPM 52 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type Drill from 9493' MD to 12207' MD. The max gas observed was 2620 units at 11478' MD. Trip 5 5126' 100% Gas In Air=10,000 UnitsConnection Average 188Background Mud (lb/bbl)ml/30min 3.122.40 (max) 501 C-3 Chromatograph (ppm) 986 320 178 284 0 0 Cement C-1 C-5i ShSiltst LstClyst C-4i Drill 8.75" hole PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 2901' Ss Cht Silt 100 Avg to 0' Current 277.70.0 MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 109 SPP (psi) 9493' 12207' 2714' Lime TuffGvl 96% Date: % 541 Alkal Coal Gallons/stroke 1298 Sandstone : trnsp-trnsl-dk gry-brn-blk, f-vf gr, sb rnd-sb ang, wl srt, tr shl frags, uncons, SHOW: lt brn stn, 50% even dull yel fluor, stmg dull wh cut fluor, pl straw ct, dk straw res, fnt wh res fluor. 11478' 0 316 203 Minimum Depth 13 3/8" Maximum in 14 Lithology (%) 4 Bit # 125618 179 Depth 0' 0.746 17 86 C-2 0 C-4n 0 Gas Summary 2620 (current) Units* 907-685-0772Unit Phone: 116 A.Paul Kalenuik Set AtSize 178.9 X-65 Grade 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC 212237 0 . #. * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC 327882 0 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' 907-685-0772Unit Phone: 123 A.Paul Kalenuik Set AtSize 178.9 X-65 Grade Gas Summary 2761 (current) Units*C-2 0 C-4n 0 106139 106 Depth 0' 0.746 16 93Minimum Depth 13 3/8" Maximum in 3 Lithology (%) 4 Bit # 12943' 0 304 207 1278 stmg dull wh cut fluor, pl straw ct, lt amb res, dull brn res fluor. % 546 Alkal Coal Gallons/stroke 12207' 13738' 1531' Lime TuffGvl 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 111 SPP (psi) Avg to 0' Current 58.78.3 MWD Summary Ss Cht Silt 100 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 2901' Drill 8.75" hole PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i 112 259 0 0 Chromatograph (ppm) 888 255 Mud (lb/bbl)ml/30min 2.932.25 (max) 350 C-3 Average 148Background 100% Gas In Air=10,000 UnitsConnection Sandstone : trnsp-trnsl-blk-gry-wh-gn, f-vf gr, sb rnd-sb ang, w srt, r glauc, uncons, SHOW: lt brn stn, 80% even dull yl-wh fluor, Drill from 12207' MD to 13738' MD. The max gas observed was 2761 units at 12943' MD. Continuing to drill ahead. Trip 5 5126' 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type 5326' WOB Smith XR+CPS Mill tooth TFA Condition 20 RPM 49 Mud Type FAZEPRO - Ratio Mud Data Depth 67/339.30 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 13587'7.2 11.39 11.50 Cor Solids 11.49 Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 362.0 Morning Report Report # 30 Customer: Well: Area: Location: Rig: SP24-SE1 26-Mar-2014 12:00 AM AK-AM-0901144926 2441 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft 13466' 98 48133 Density (ppg) out (sec/qt) Viscosity . #. * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 74 34101 12:00 AM AK-AM-0901144926 2605 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft 13466'362.0 Morning Report Report # 31 Customer: Well: Area: Location: Rig: SP24-SE1 27-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: 11.73 Cor Solids 11.67 Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15056'6.9 11.61 Mud Type FAZEPRO - Ratio Mud Data Depth 68/329.30 Oil / Water (lb/100ft2) 5326' WOB Smith XR+CPS Mill tooth TFA Condition 20 RPM 49 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type Drill from 13738' MD to 15225' MD which is TD. The max gas observed was 2951 units at 113713' MD. Trip 5 5126' Sandstone : trnsp-trnsl- blk-dk gry-wh-gn, f-v fn gr, sb rnd-sb ang, w srt, tr glauc, tr shl frags, uncons, SHOW: lt brn stn, 100% Gas In Air=10,000 UnitsConnection Average 63Background Mud (lb/bbl)ml/30min 2.732.10 (max) 326 C-3 Chromatograph (ppm) 971 237 86 218 0 0 Cement C-1 C-5i ShSiltst LstClyst C-4i Downlink MWD Exceed PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 2901' Ss Cht Silt 100 Avg to 0' Current 58.70.0 MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 111 SPP (psi) 13738' 15225' 1531' Lime TuffGvl 96% Date: % 546 Alkal Coal Gallons/stroke 1151 60% pchy dull wh fluor, blmg dull wh cut fluor, pl straw ct, straw res, fnt yel res fluor. 13713' 0 245 152 Minimum Depth 13 3/8" Maximum in 17 Lithology (%) 4 Bit # 100241 80 Depth 0' 0.746 17 109 C-2 0 C-4n 0 Gas Summary 2951 (current) Units* 907-685-0772Unit Phone: 76 A.Paul Kalenuik Set AtSize 178.9 X-65 Grade 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC 349503 0 . #. * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' 907-685-0772Unit Phone:A.Paul Kalenuik Set AtSize 178.9 X-65 Grade Gas Summary (current) Units*C-2 C-4n Depth 0' 0.746 16 Minimum Depth 13 3/8" Maximum in Lithology (%) 4 Bit # 60% pchy dull wh fluor, blmg dull wh cut fluor, pl straw ct, straw res, fnt yel res fluor. % 531 Alkal Coal Gallons/stroke 15225' 15225' 0' Lime TuffGvl 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 108 SPP (psi) Avg to 0' Current 0.0 MWD Summary Ss Cht Silt 100 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 2901' BROOH PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i Chromatograph (ppm) 130 Mud (lb/bbl)ml/30min 3.122.40 (max) C-3 Average Background 100% Gas In Air=10,000 UnitsConnection Sandstone : trnsp-trnsl- blk-dk gry-wh-gn, f-v fn gr, sb rnd-sb ang, w srt, tr glauc, tr shl frags, uncons, SHOW: lt brn stn, TD Sample: Cont BROOH f/12715' to 7480' at 530 gpm. PM tour loss:24 bbl. Daily OBM losses: 84 bbls. Trip 5 5126' 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type 5326' WOB Smith XR+CPS Mill tooth TFA Condition 17 RPM 47 Mud Type FAZEPRO - Ratio Mud Data Depth 69/319.25 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15225'7.3 Cor Solids 10.28 Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Morning Report Report # 32 Customer: Well: Area: Location: Rig: SP24-SE1 28-Mar-2014 12:00 AM AK-AM-0901144926 1700 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft 34 Density (ppg) out (sec/qt) Viscosity . #. * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 34 12:00 AM AK-AM-0901144926 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft Morning Report Report # 33 Customer: Well: Area: Location: Rig: SP24-SE1 29-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Cor Solids Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15225'7.5 Mud Type FAZEPRO - Ratio Mud Data Depth 69/319.25 Oil / Water (lb/100ft2) 5326' WOB Smith XR+CPS Mill tooth TFA Condition 1-1-WT-A-E-I-NO-BHA 16 RPM 52 6 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type Service rig. RIH whipstock retreival BHA to 83'. Service rig. PM tour loss: 15 bbls. Trip 5 5326' 70.00 Sandstone : trnsp-trnsl- blk-dk gry-wh-gn, f-v fn gr, sb rnd-sb ang, w srt, tr glauc, tr shl frags, uncons, SHOW: lt brn stn, TD Sample: 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min 3.062.35 (max) C-3 9899' Chromatograph (ppm) Cement C-1 C-5i ShSiltst LstClyst C-4i Service Rig PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 15225' 2901' Ss Cht Silt 100 Avg to 0' Current 0.0 MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) 15225' 15225' 0' Lime TuffGvl 1-1-CT-A-X-IN-NO-TD 96% Date: % Alkal Coal Gallons/stroke 60% pchy dull wh fluor, blmg dull wh cut fluor, pl straw ct, straw res, fnt yel res fluor. Minimum Depth 13 3/8" Maximum in Lithology (%) 4 Bit # Depth 0' 0.746 14 C-2 C-4n Gas Summary (current) Units* 907-685-0772Unit Phone:A.Paul Kalenuik Set AtSize 178.9 X-65 Grade 159 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC . #. * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC 159 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' 907-685-0772Unit Phone:A.Paul Kalenuik Set AtSize 178.9 X-65 Grade Gas Summary (current) Units*C-2 C-4n Depth 0' 0.746 15 Minimum Depth 13 3/8" Maximum in Lithology (%) 4 Bit # 60% pchy dull wh fluor, blmg dull wh cut fluor, pl straw ct, straw res, fnt yel res fluor. % Alkal Coal Gallons/stroke 15225' 15225' 0' Lime TuffGvl 1-1-CT-A-X-IN-NO-TD 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) Avg to 0' Current 0.0 MWD Summary Ss Cht Silt 100 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 15225' 2901' RIH / Liner PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i 9899' Chromatograph (ppm) Mud (lb/bbl)ml/30min 3.382.60 (max) C-3 Average Background 100% Gas In Air=10,000 UnitsConnection Sandstone : trnsp-trnsl- blk-dk gry-wh-gn, f-v fn gr, sb rnd-sb ang, w srt, tr glauc, tr shl frags, uncons, SHOW: lt brn stn, TD Sample: Drop rabbit. POH. L/D whipstock & retreival tool. C/O saver sub & inspect top drive. Trip 5 5326' 70.00 6 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type 5326' WOB Smith XR+CPS Mill tooth TFA Condition 1-1-WT-A-E-I-NO-BHA 17 RPM 49 Mud Type FAZEPRO - Ratio Mud Data Depth 69/319.25 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15225'7.2 Cor Solids Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Morning Report Report # 34 Customer: Well: Area: Location: Rig: SP24-SE1 30-Mar-2014 12:00 AM AK-AM-0901144926 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft 34 Density (ppg) out (sec/qt) Viscosity . #. * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 12:00 AM AK-AM-0901144926 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft Morning Report Report # 35 Customer: Well: Area: Location: Rig: SP24-SE1 31-Mar-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Cor Solids Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15225'7.4 Mud Type FAZEPRO - Ratio Mud Data Depth 69/39.25 Oil / Water (lb/100ft2) 5326' WOB Smith XR+CPS Mill tooth TFA Condition 1-1-WT-A-E-I-NO-BHA 16 RPM 51 6 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type RIH 5.5" Liner. Liner went thru window no problems. RIH w/5" DP & tag bottom at 15225'. Shoe at 15210'. Set at Trip 5 5326' 70.00 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min 3.252.50 (max) C-3 9899' Chromatograph (ppm) Cement C-1 C-5i ShSiltst LstClyst C-4i Displacing To Brine PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 15225' 2901' Ss Cht Silt 100 Avg to 0' Current 0.0 MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) 15225' 15225' 0' Lime TuffGvl 1-1-CT-A-X-IN-NO-TD 96% Date: % Alkal Coal Gallons/stroke Minimum Depth 13 3/8" Maximum in Lithology (%) 4 Bit # Depth 0' 0.746 16 C-2 C-4n Gas Summary (current) Units* 907-685-0772Unit Phone:A.Paul Kalenuik Set AtSize 178.9 X-65 Grade 159 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC . #. * 24 hr Recap: Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC 159 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' 907-685-0772Unit Phone:A.Paul Kalenuik Set AtSize 178.9 X-65 Grade Gas Summary (current) Units*C-2 C-4n Depth 0' 0.746 Minimum Depth 13 3/8" Maximum in Lithology (%) 4 Bit # % Alkal Coal Gallons/stroke 15225' 15225' 0' Lime TuffGvl 1-1-CT-A-X-IN-NO-TD 96% Date: Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) Avg to 0' Current 0.0 MWD Summary Ss Cht Silt 100 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 15225' 2901' Run Up Tbq Equip PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type Cement C-1 C-5i ShSiltst LstClyst C-4i 9899' Chromatograph (ppm) Mud (lb/bbl)ml/30min (max) C-3 Average Background 100% Gas In Air=10,000 UnitsConnection Cleaned surface equip & pits of FazePro. PJSM. Cut & slip drill line. Service rig. L/D 5" DP f/4865' & running tool. Trip 5 5326' 70.00 6 15 Size 160' EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type 5326' WOB Smith XR+CPS Mill tooth TFA Condition 1-1-WT-A-E-I-NO-BHA RPM 27 Mud Type FAZEPRO Ratio Mud Data Depth 9.20 Oil / Water (lb/100ft2) 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15225' Cor Solids Avg Min YP MaxECD (ppg) Tools ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Morning Report Report # 36 Customer: Well: Area: Location: Rig: SP24-SE1 1-Apr-2014 12:00 AM AK-AM-0901144926 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft Density (ppg) out (sec/qt) Viscosity . #. * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 12:00 AM AK-AM-0901144926 ROP ROP (ft/hr) J.Keener/O. Amend 24 hr Max Max @ ft Morning Report Report # 37 Customer: Well: Area: Location: Rig: SP24-SE1 2-Apr-2014 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: Rig Activity: Cor Solids Avg Min YP MaxECD (ppg) Tools 4.23 @ Current Pump & Flow Data: DOYON15 Report For: 15225' Mud Type FAZEPRO Ratio Mud Data Depth 9.20 Oil / Water (lb/100ft2) 5326' WOB Smith XR+CPS Mill tooth TFA Condition 1-1-WT-A-E-I-NO-BHA RPM 27 6 15 Size 160'EVEMAR Hycalog SKH616-E1D Casing Summary L-80 Bit Type R/U wireline & set pump. RIH 4.5" comp. tbg to 195';splice at same depth. RIH tbg f/195' to 2017' C/O Cap tube Trip 5 5326' 70.00 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min (max) C-3 9899' Chromatograph (ppm) Cement C-1 C-5i ShSiltst LstClyst C-4i Run 4.5" Comp Tbg PV cP 68.0 Weight Flow In (gpm) Flow In (spm) Type 8.75 0.746 Footage 40.0 Depth in / out 5237' 8.75 5126' 15225' 2901' Ss Cht Silt 100 Avg to 0' Current 0.0 MWD Summary Time: API FL C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: SPP (psi) 15225' 15225' 0' Lime TuffGvl 1-1-CT-A-X-IN-NO-TD 96% Date: % Alkal Coal Gallons/stroke Minimum Depth 13 3/8" Maximum in Lithology (%) 4 Bit # Depth 0' 0.746 C-2 C-4n Gas Summary (current) Units* 907-685-0772Unit Phone:A.Paul Kalenuik Set AtSize 178.9 X-65 Grade 159 40 Hours 3.20 Cly HYDRIL L-80 Comments 200' Report By: 20.00'' 9 5/8'' Logging Engineers:Paul Kalenuik/Jade Miller (max)(current) BTC WELL INFORMATION Created On : May 15 2014 Customer :ENI Petroleum Well Name :SP24-SE1 Job Number :AK-XX-0901144926 Rig Name :Doyon 15 Country :USA County :North Slope Borough Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00 40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00 40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00 40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00 121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64 121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64 121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64 121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64 136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04 136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04 136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04 136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04 151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38 151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38 151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38 151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38 164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07 164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07 164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07 164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07 180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86 180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86 180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86 180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86 197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94 197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94 197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94 197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94 213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96 213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96 213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96 INSITE V8.0.20 Page 1Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96 229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15 229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15 229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15 229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15 244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66 244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66 244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66 244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66 257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30 257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30 257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30 257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30 275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18 275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18 275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18 275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18 292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56 292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56 292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56 292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56 307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88 307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88 307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88 307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88 323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22 323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22 323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22 323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22 337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44 337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44 337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44 337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44 350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07 350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07 350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07 350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07 364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21 364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21 364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21 364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21 376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68 376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68 376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68 376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68 INSITE V8.0.20 Page 2Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64 398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64 398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64 398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64 414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59 414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59 414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59 414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59 429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39 429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39 429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39 429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39 457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48 457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48 457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48 457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48 471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24 471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24 471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24 471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24 485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63 485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63 485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63 485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63 506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30 506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30 506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30 506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30 521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98 521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98 521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98 521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98 550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74 550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74 550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74 550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74 582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02 582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02 582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02 582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02 613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38 613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38 613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38 613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38 642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37 INSITE V8.0.20 Page 3Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37 642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37 642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37 674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10 674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10 674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10 674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 INSITE V8.0.20 Page 4Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 INSITE V8.0.20 Page 5Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35 1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35 1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35 1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35 1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31 1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31 1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31 1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31 1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22 1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22 1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22 1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22 1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11 INSITE V8.0.20 Page 6Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11 1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11 1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11 1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57 1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57 1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57 1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57 1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27 1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27 1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27 1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27 1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14 1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14 1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14 1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14 1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34 1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34 1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34 1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34 1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46 1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46 1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46 1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46 1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98 1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98 1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98 1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98 1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37 1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37 1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37 1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37 1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21 1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21 1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21 1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21 1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10 1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10 1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10 1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10 1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77 1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77 1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77 1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77 1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42 1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42 INSITE V8.0.20 Page 7Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42 1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42 1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43 1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43 1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43 1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43 1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31 1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31 1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31 1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50 1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50 1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50 1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50 2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80 2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80 2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80 2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80 2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83 2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83 2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83 2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83 2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34 2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34 2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34 2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34 2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14 2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14 2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14 2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14 2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57 2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57 2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57 2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57 2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88 2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88 2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88 2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88 2202.22 45.18 291.43 1,890.28 422.30 N 838.21 W 422.30 6.60 2202.22 45.18 291.43 1,890.28 422.30 N 838.21 W 422.30 6.60 INSITE V8.0.20 Page 8Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2230.13 44.13 290.81 1,910.14 429.37 N 856.51 W 429.37 4.07 2262.03 43.21 289.81 1,933.21 437.02 N 877.16 W 437.02 3.61 2294.29 42.53 287.46 1,956.86 444.03 N 897.95 W 444.03 5.39 2323.44 41.50 286.22 1,978.51 449.68 N 916.63 W 449.68 4.54 2380.86 39.91 284.83 2,022.04 459.71 N 952.70 W 459.71 3.19 2474.26 37.29 280.33 2,095.04 472.46 N 1,009.52 W 472.46 4.11 2567.54 35.43 273.46 2,170.19 479.16 N 1,064.34 W 479.16 4.80 2660.91 34.10 267.82 2,246.91 479.80 N 1,117.52 W 479.80 3.73 2754.32 32.32 261.94 2,325.08 475.30 N 1,168.43 W 475.30 3.94 2833.94 31.34 257.95 2,392.74 467.99 N 1,209.76 W 467.99 2.91 3009.06 28.86 242.30 2,544.47 438.79 N 1,291.86 W 438.79 4.69 3102.34 27.90 232.25 2,626.58 414.95 N 1,329.07 W 414.95 5.22 3195.69 24.76 225.33 2,710.26 387.82 N 1,360.25 W 387.82 4.70 3289.38 25.86 216.72 2,794.98 357.64 N 1,386.43 W 357.64 4.10 3382.44 28.84 207.88 2,877.66 321.51 N 1,409.08 W 321.51 5.41 3475.86 28.66 198.25 2,959.61 280.30 N 1,426.64 W 280.30 4.96 3569.30 29.72 188.82 3,041.23 236.10 N 1,437.21 W 236.10 5.05 3662.64 30.86 179.39 3,121.87 189.27 N 1,440.51 W 189.27 5.23 3756.00 33.30 172.10 3,201.00 139.92 N 1,436.73 W 139.92 4.90 3849.45 37.30 167.49 3,277.27 86.84 N 1,427.06 W 86.84 5.14 3942.84 42.42 165.09 3,348.93 28.73 N 1,412.82 W 28.73 5.72 4036.28 47.32 163.60 3,415.14 34.71 S 1,395.00 W -34.71 5.36 4129.70 50.93 159.78 3,476.27 101.72 S 1,372.76 W -101.72 4.95 4223.13 53.92 155.71 3,533.26 170.20 S 1,344.68 W -170.20 4.71 4316.56 56.82 151.72 3,586.36 239.08 S 1,310.61 W -239.08 4.69 4410.00 59.13 148.52 3,635.92 307.73 S 1,271.13 W -307.73 3.81 4503.38 63.84 146.61 3,680.49 376.95 S 1,227.11 W -376.95 5.35 4596.75 66.33 144.99 3,719.82 446.97 S 1,179.51 W -446.97 3.10 4690.19 69.95 142.30 3,754.61 516.77 S 1,128.10 W -516.77 4.71 4783.67 71.37 141.63 3,785.57 586.24 S 1,073.75 W -586.24 1.66 4877.01 71.38 140.62 3,815.38 655.10 S 1,018.24 W -655.10 1.03 4970.07 71.28 137.47 3,845.18 721.68 S 960.46 W -721.68 3.21 5063.42 74.54 134.41 3,872.61 785.77 S 898.41 W -785.77 4.69 5156.79 74.91 133.31 3,897.21 848.17 S 833.47 W -848.17 1.20 5181.65 75.67 133.34 3,903.52 864.67 S 815.97 W -864.67 3.06 5263.00 79.21 132.38 3,921.21 918.67 S 757.78 W -918.67 4.50 5644.98 85.28 126.43 3,972.78 1,158.60 S 465.51 W -1158.60 2.21 5738.41 87.04 127.41 3,979.03 1,214.59 S 390.99 W -1214.59 2.15 5831.90 89.71 128.48 3,981.68 1,272.05 S 317.30 W -1272.05 3.08 5925.44 89.66 128.14 3,982.20 1,330.04 S 243.90 W -1330.04 0.37 6018.48 89.86 126.11 3,982.59 1,386.19 S 169.72 W -1386.19 2.19 6111.83 88.24 124.68 3,984.14 1,440.25 S 93.64 W -1440.25 2.31 6205.30 87.40 124.03 3,987.69 1,492.96 S 16.53 W -1492.96 1.14 6299.06 86.84 124.39 3,992.40 1,545.60 S 60.90 E -1545.61 0.71 6392.24 86.98 124.71 3,997.42 1,598.37 S 137.54 E -1598.37 0.37 INSITE V8.0.20 Page 9Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6485.28 90.36 125.73 3,999.58 1,652.01 S 213.51 E -1652.01 3.79 6578.71 92.29 124.63 3,997.42 1,705.82 S 289.85 E -1705.82 2.38 6672.10 92.48 122.42 3,993.54 1,757.35 S 367.64 E -1757.35 2.37 6765.51 92.24 121.65 3,989.69 1,806.86 S 446.75 E -1806.86 0.86 6859.71 90.96 120.67 3,987.06 1,855.58 S 527.33 E -1855.58 1.71 6952.31 87.12 121.78 3,988.61 1,903.56 S 606.49 E -1903.57 4.32 7045.61 86.78 124.60 3,993.58 1,954.56 S 684.45 E -1954.56 3.04 7139.54 88.32 125.69 3,997.59 2,008.58 S 761.18 E -2008.58 2.01 7232.36 88.96 125.13 3,999.79 2,062.35 S 836.81 E -2062.35 0.92 7325.66 89.22 125.63 4,001.28 2,116.36 S 912.87 E -2116.36 0.60 7419.02 90.17 126.84 4,001.77 2,171.54 S 988.17 E -2171.54 1.65 7512.40 90.23 127.56 4,001.45 2,228.00 S 1,062.55 E -2228.00 0.77 7605.80 89.47 127.96 4,001.69 2,285.19 S 1,136.39 E -2285.19 0.92 7699.26 90.51 129.41 4,001.71 2,343.61 S 1,209.34 E -2343.61 1.91 7792.59 91.04 130.11 4,000.45 2,403.29 S 1,281.08 E -2403.29 0.94 7885.96 87.36 128.90 4,001.75 2,462.67 S 1,353.10 E -2462.67 4.15 7979.36 86.71 127.56 4,006.58 2,520.39 S 1,426.37 E -2520.39 1.59 8072.68 88.75 127.71 4,010.28 2,577.33 S 1,500.21 E -2577.33 2.19 8165.92 89.84 127.97 4,011.42 2,634.52 S 1,573.84 E -2634.52 1.20 8259.33 89.64 127.89 4,011.85 2,691.94 S 1,647.51 E -2691.94 0.23 8353.78 89.24 127.04 4,012.77 2,749.39 S 1,722.48 E -2749.39 0.99 8446.11 89.56 125.65 4,013.74 2,804.10 S 1,796.84 E -2804.10 1.54 8540.06 89.63 124.44 4,014.40 2,858.05 S 1,873.75 E -2858.05 1.29 8631.47 88.79 123.07 4,015.66 2,908.83 S 1,949.74 E -2908.83 1.76 8725.01 88.48 122.53 4,017.89 2,959.49 S 2,028.35 E -2959.49 0.67 8819.50 88.61 122.97 4,020.29 3,010.59 S 2,107.79 E -3010.59 0.49 8912.89 88.43 124.12 4,022.70 3,062.18 S 2,185.60 E -3062.18 1.25 9006.16 90.82 127.50 4,023.31 3,116.74 S 2,261.22 E -3116.74 4.44 9100.05 88.99 125.62 4,023.47 3,172.66 S 2,336.63 E -3172.66 2.79 9192.87 87.91 123.63 4,025.98 3,225.38 S 2,412.98 E -3225.38 2.44 9286.17 91.11 124.78 4,026.78 3,277.82 S 2,490.12 E -3277.82 3.64 9379.56 91.35 125.69 4,024.77 3,331.68 S 2,566.39 E -3331.68 1.01 9473.73 92.67 124.99 4,021.47 3,386.12 S 2,643.15 E -3386.12 1.59 9567.62 90.63 124.79 4,018.77 3,439.80 S 2,720.13 E -3439.80 2.18 9660.30 89.72 125.16 4,018.48 3,492.92 S 2,796.07 E -3492.92 1.06 9753.11 89.75 125.32 4,018.91 3,546.47 S 2,871.87 E -3546.47 0.18 9846.48 89.79 124.48 4,019.29 3,599.89 S 2,948.45 E -3599.90 0.90 9939.84 88.41 124.97 4,020.75 3,653.07 S 3,025.17 E -3653.07 1.57 10033.33 87.85 125.84 4,023.81 3,707.20 S 3,101.33 E -3707.20 1.11 10126.69 86.56 126.58 4,028.36 3,762.29 S 3,176.57 E -3762.29 1.59 10220.01 85.91 126.31 4,034.49 3,817.60 S 3,251.47 E -3817.60 0.75 10314.28 87.92 127.10 4,039.56 3,873.86 S 3,326.94 E -3873.86 2.29 10406.85 87.72 128.24 4,043.08 3,930.39 S 3,400.16 E -3930.39 1.25 10500.16 88.78 128.70 4,045.93 3,988.41 S 3,473.18 E -3988.41 1.24 10593.63 88.84 128.05 4,047.87 4,046.43 S 3,546.44 E -4046.43 0.70 INSITE V8.0.20 Page 10Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10686.97 88.79 126.78 4,049.80 4,103.13 S 3,620.56 E -4103.13 1.36 10780.32 88.09 126.66 4,052.34 4,158.92 S 3,695.35 E -4158.92 0.76 10873.70 88.42 127.22 4,055.19 4,215.01 S 3,769.95 E -4215.01 0.70 10967.06 88.05 126.08 4,058.06 4,270.71 S 3,844.82 E -4270.71 1.28 11060.41 90.72 127.09 4,059.06 4,326.34 S 3,919.77 E -4326.34 3.06 11153.88 91.29 125.78 4,057.42 4,381.85 S 3,994.95 E -4381.85 1.53 11247.16 91.97 125.48 4,054.77 4,436.16 S 4,070.74 E -4436.16 0.80 11340.55 93.12 124.57 4,050.62 4,489.71 S 4,147.14 E -4489.71 1.57 11433.99 92.14 123.95 4,046.34 4,542.25 S 4,224.28 E -4542.25 1.24 11527.15 89.44 123.38 4,045.05 4,593.89 S 4,301.80 E -4593.89 2.96 11621.09 89.88 122.93 4,045.61 4,645.26 S 4,380.45 E -4645.26 0.67 11714.17 89.47 122.72 4,046.14 4,695.72 S 4,458.66 E -4695.72 0.49 11807.50 89.82 122.60 4,046.72 4,746.08 S 4,537.24 E -4746.08 0.40 11900.87 89.65 124.00 4,047.15 4,797.34 S 4,615.27 E -4797.34 1.51 11994.25 91.13 124.47 4,046.51 4,849.87 S 4,692.47 E -4849.87 1.66 12087.57 91.27 125.98 4,044.56 4,903.69 S 4,768.68 E -4903.69 1.62 12181.19 90.12 126.08 4,043.42 4,958.75 S 4,844.39 E -4958.75 1.23 12274.22 90.26 127.54 4,043.11 5,014.49 S 4,918.87 E -5014.49 1.58 12367.50 89.53 126.86 4,043.28 5,070.88 S 4,993.17 E -5070.88 1.07 12460.88 92.13 128.10 4,041.93 5,127.69 S 5,067.25 E -5127.69 3.08 12554.21 92.26 125.90 4,038.36 5,183.81 S 5,141.73 E -5183.81 2.36 12647.60 91.58 125.19 4,035.23 5,238.07 S 5,217.68 E -5238.08 1.05 12741.02 92.04 125.67 4,032.28 5,292.20 S 5,293.76 E -5292.20 0.71 12834.46 92.26 126.31 4,028.77 5,347.07 S 5,369.31 E -5347.07 0.72 12927.80 90.35 126.07 4,026.65 5,402.17 S 5,444.62 E -5402.17 2.06 13021.16 90.43 127.54 4,026.01 5,458.10 S 5,519.36 E -5458.10 1.58 13114.61 89.61 128.17 4,025.98 5,515.45 S 5,593.15 E -5515.45 1.11 13208.00 89.54 127.09 4,026.67 5,572.46 S 5,667.11 E -5572.46 1.16 13301.44 90.69 125.90 4,026.48 5,628.04 S 5,742.22 E -5628.04 1.77 13394.86 90.69 124.87 4,025.36 5,682.13 S 5,818.38 E -5682.13 1.10 13488.29 90.75 123.86 4,024.18 5,734.86 S 5,895.49 E -5734.86 1.08 13581.72 91.95 123.87 4,021.98 5,786.91 S 5,973.05 E -5786.91 1.28 13675.16 92.15 124.54 4,018.64 5,839.40 S 6,050.28 E -5839.40 0.75 13768.54 92.46 125.49 4,014.89 5,892.94 S 6,126.69 E -5892.94 1.07 13861.91 91.05 124.97 4,012.03 5,946.77 S 6,202.93 E -5946.77 1.61 13955.35 87.98 125.65 4,012.82 6,000.77 S 6,279.16 E -6000.77 3.37 14048.83 87.91 125.64 4,016.17 6,055.21 S 6,355.08 E -6055.21 0.08 14142.17 89.45 125.82 4,018.32 6,109.70 S 6,430.83 E -6109.70 1.66 14235.23 87.50 126.68 4,020.80 6,164.71 S 6,505.85 E -6164.71 2.29 14328.58 87.32 126.26 4,025.01 6,220.14 S 6,580.84 E -6220.14 0.49 14421.95 89.52 126.95 4,027.59 6,275.79 S 6,655.76 E -6275.79 2.47 14515.40 85.40 126.06 4,031.73 6,331.32 S 6,730.78 E -6331.32 4.51 14608.78 87.93 127.01 4,037.16 6,386.81 S 6,805.68 E -6386.81 2.89 14702.09 88.84 127.20 4,039.79 6,443.08 S 6,880.07 E -6443.08 1.00 14795.52 88.65 126.29 4,041.84 6,498.96 S 6,954.91 E -6498.96 0.99 INSITE V8.0.20 Page 11Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14888.92 91.35 126.65 4,041.84 6,554.47 S 7,030.02 E -6554.47 2.92 14982.20 91.92 125.87 4,039.18 6,609.62 S 7,105.20 E -6609.62 1.04 15075.57 91.64 125.86 4,036.28 6,664.29 S 7,180.83 E -6664.30 0.30 15169.52 92.11 126.00 4,033.20 6,719.39 S 7,256.86 E -6719.40 0.52 15240.00 92.11 126.00 4,030.61 6,760.79 S 7,313.84 E -6760.79 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (Grid) - A total correction of 0.00 deg from Magnetic north to Grid north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 15,240.00 feet is 9,959.95 feet along 132.75 degrees (Grid) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.20 Page 12Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report WELL INFORMATION Created On : May 15 2014 Customer :ENI Petroleum Well Name :SP24-SE1 L1 Job Number :AK-XX-0901144926 Rig Name :Doyon 15 Country :USA County :North Slope Borough Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00 40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00 40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00 40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00 121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64 121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64 121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64 121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64 136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04 136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04 136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04 136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04 151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38 151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38 151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38 151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38 164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07 164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07 164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07 164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07 180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86 180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86 180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86 180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86 197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94 197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94 197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94 197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94 213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96 213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96 213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96 INSITE V8.0.20 Page 1Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96 229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15 229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15 229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15 229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15 244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66 244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66 244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66 244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66 257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30 257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30 257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30 257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30 275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18 275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18 275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18 275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18 292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56 292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56 292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56 292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56 307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88 307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88 307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88 307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88 323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22 323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22 323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22 323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22 337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44 337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44 337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44 337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44 350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07 350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07 350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07 350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07 364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21 364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21 364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21 364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21 376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68 376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68 376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68 376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68 INSITE V8.0.20 Page 2Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64 398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64 398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64 398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64 414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59 414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59 414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59 414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59 429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39 429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39 429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39 429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39 457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48 457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48 457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48 457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48 471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24 471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24 471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24 471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24 485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63 485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63 485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63 485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63 506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30 506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30 506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30 506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30 521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98 521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98 521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98 521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98 550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74 550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74 550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74 550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74 582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02 582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02 582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02 582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02 613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38 613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38 613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38 613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38 642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37 INSITE V8.0.20 Page 3Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37 642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37 642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37 674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10 674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10 674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10 674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 INSITE V8.0.20 Page 4Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 INSITE V8.0.20 Page 5Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14 1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35 1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35 1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35 1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35 1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31 1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31 1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31 1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31 1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22 1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22 1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22 1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22 1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11 INSITE V8.0.20 Page 6Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11 1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11 1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11 1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57 1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57 1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57 1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57 1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27 1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27 1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27 1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27 1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14 1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14 1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14 1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14 1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34 1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34 1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34 1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34 1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46 1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46 1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46 1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46 1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98 1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98 1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98 1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98 1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37 1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37 1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37 1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37 1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21 1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21 1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21 1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21 1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10 1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10 1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10 1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10 1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77 1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77 1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77 1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77 1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42 1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42 INSITE V8.0.20 Page 7Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42 1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42 1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43 1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43 1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43 1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43 1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31 1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31 1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31 1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70 1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50 1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50 1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50 1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50 2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80 2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80 2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80 2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80 2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83 2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83 2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83 2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83 2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34 2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34 2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34 2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34 2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14 2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14 2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14 2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14 2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57 2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57 2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57 2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57 2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88 2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88 2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88 2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88 2202.22 45.18 291.43 1,890.28 422.30 N 838.21 W 422.30 6.60 2202.22 45.18 291.43 1,890.28 422.30 N 838.21 W 422.30 6.60 INSITE V8.0.20 Page 8Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2230.13 44.13 290.81 1,910.14 429.37 N 856.51 W 429.37 4.07 2262.03 43.21 289.81 1,933.21 437.02 N 877.16 W 437.02 3.61 2294.29 42.53 287.46 1,956.86 444.03 N 897.95 W 444.03 5.39 2323.44 41.50 286.22 1,978.51 449.68 N 916.63 W 449.68 4.54 2380.86 39.91 284.83 2,022.04 459.71 N 952.70 W 459.71 3.19 2474.26 37.29 280.33 2,095.04 472.46 N 1,009.52 W 472.46 4.11 2567.54 35.43 273.46 2,170.19 479.16 N 1,064.34 W 479.16 4.80 2660.91 34.10 267.82 2,246.91 479.80 N 1,117.52 W 479.80 3.73 2754.32 32.32 261.94 2,325.08 475.30 N 1,168.43 W 475.30 3.94 2833.94 31.34 257.95 2,392.74 467.99 N 1,209.76 W 467.99 2.91 3009.06 28.86 242.30 2,544.47 438.79 N 1,291.86 W 438.79 4.69 3102.34 27.90 232.25 2,626.58 414.95 N 1,329.07 W 414.95 5.22 3195.69 24.76 225.33 2,710.26 387.82 N 1,360.25 W 387.82 4.70 3289.38 25.86 216.72 2,794.98 357.64 N 1,386.43 W 357.64 4.10 3382.44 28.84 207.88 2,877.66 321.51 N 1,409.08 W 321.51 5.41 3475.86 28.66 198.25 2,959.61 280.30 N 1,426.64 W 280.30 4.96 3569.30 29.72 188.82 3,041.23 236.10 N 1,437.21 W 236.10 5.05 3662.64 30.86 179.39 3,121.87 189.27 N 1,440.51 W 189.27 5.23 3756.00 33.30 172.10 3,201.00 139.92 N 1,436.73 W 139.92 4.90 3849.45 37.30 167.49 3,277.27 86.84 N 1,427.06 W 86.84 5.14 3942.84 42.42 165.09 3,348.93 28.73 N 1,412.82 W 28.73 5.72 4036.28 47.32 163.60 3,415.14 34.71 S 1,395.00 W -34.71 5.36 4129.70 50.93 159.78 3,476.27 101.72 S 1,372.76 W -101.72 4.95 4223.13 53.92 155.71 3,533.26 170.20 S 1,344.68 W -170.20 4.71 4316.56 56.82 151.72 3,586.36 239.08 S 1,310.61 W -239.08 4.69 4410.00 59.13 148.52 3,635.92 307.73 S 1,271.13 W -307.73 3.81 4503.38 63.84 146.61 3,680.49 376.95 S 1,227.11 W -376.95 5.35 4596.75 66.33 144.99 3,719.82 446.97 S 1,179.51 W -446.97 3.10 4690.19 69.95 142.30 3,754.61 516.77 S 1,128.10 W -516.77 4.71 4783.67 71.37 141.63 3,785.57 586.24 S 1,073.75 W -586.24 1.66 4877.01 71.38 140.62 3,815.38 655.10 S 1,018.24 W -655.10 1.03 4970.07 71.28 137.47 3,845.18 721.68 S 960.46 W -721.68 3.21 5063.42 74.54 134.41 3,872.61 785.77 S 898.41 W -785.77 4.69 5156.79 74.91 133.31 3,897.21 848.17 S 833.47 W -848.17 1.20 5181.65 75.67 133.34 3,903.52 864.67 S 815.97 W -864.67 3.06 5366.79 83.06 121.06 3,937.79 974.20 S 671.29 W -974.20 7.64 5460.01 84.63 116.91 3,947.79 1,019.09 S 590.23 W -1019.09 4.74 5553.38 86.59 115.31 3,954.94 1,060.06 S 506.64 W -1060.06 2.71 5646.82 88.36 116.08 3,959.06 1,100.53 S 422.53 W -1100.53 2.07 5740.25 88.92 116.38 3,961.27 1,141.81 S 338.75 W -1141.81 0.68 5833.74 88.88 119.89 3,963.07 1,185.88 S 256.33 W -1185.88 3.75 5927.00 89.78 121.66 3,964.16 1,233.60 S 176.21 W -1233.60 2.13 6020.32 88.98 122.96 3,965.17 1,283.47 S 97.35 W -1283.47 1.64 6113.67 87.58 122.29 3,967.97 1,333.78 S 18.77 W -1333.78 1.66 6207.14 87.80 123.40 3,971.74 1,384.43 S 59.70 E -1384.43 1.21 INSITE V8.0.20 Page 9Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6300.46 88.58 125.33 3,974.69 1,437.08 S 136.69 E -1437.08 2.23 6393.81 88.61 125.71 3,976.98 1,491.29 S 212.64 E -1491.29 0.41 6487.12 87.88 126.14 3,979.83 1,546.02 S 288.17 E -1546.02 0.91 6580.55 87.07 126.09 3,983.95 1,601.03 S 363.57 E -1601.03 0.87 6673.94 87.44 125.46 3,988.42 1,655.56 S 439.25 E -1655.56 0.78 6767.35 87.91 125.50 3,992.21 1,709.73 S 515.25 E -1709.74 0.50 6860.72 87.20 126.89 3,996.19 1,764.82 S 590.53 E -1764.82 1.67 6954.15 88.61 127.42 3,999.61 1,821.21 S 664.95 E -1821.21 1.61 7047.45 89.00 126.75 4,001.56 1,877.46 S 739.36 E -1877.46 0.83 7140.87 88.91 125.11 4,003.26 1,932.27 S 814.99 E -1932.27 1.76 7234.20 88.85 125.96 4,005.08 1,986.50 S 890.92 E -1986.50 0.91 7327.50 88.81 125.68 4,006.99 2,041.09 S 966.56 E -2041.09 0.30 7421.07 89.31 125.39 4,008.52 2,095.46 S 1,042.69 E -2095.47 0.62 7514.61 87.25 124.62 4,011.33 2,149.10 S 1,119.27 E -2149.10 2.35 7607.64 89.22 126.40 4,014.20 2,203.10 S 1,194.96 E -2203.10 2.85 7701.10 88.78 126.26 4,015.83 2,258.46 S 1,270.24 E -2258.46 0.49 7794.43 91.62 126.75 4,015.50 2,313.98 S 1,345.25 E -2313.98 3.09 7887.92 91.96 125.66 4,012.58 2,369.17 S 1,420.65 E -2369.17 1.22 7981.20 92.39 126.74 4,009.04 2,424.22 S 1,495.87 E -2424.22 1.25 8074.52 92.86 125.35 4,004.77 2,479.08 S 1,571.24 E -2479.08 1.57 8167.76 92.92 124.97 4,000.07 2,532.70 S 1,647.37 E -2532.70 0.41 8260.67 90.48 124.32 3,997.31 2,585.49 S 1,723.77 E -2585.49 2.72 8354.53 90.30 124.64 3,996.67 2,638.63 S 1,801.14 E -2638.63 0.39 8447.95 89.11 125.34 3,997.15 2,692.19 S 1,877.67 E -2692.19 1.48 8541.32 88.94 124.13 3,998.74 2,745.39 S 1,954.39 E -2745.39 1.31 8634.64 88.42 122.05 4,000.89 2,796.32 S 2,032.55 E -2796.32 2.30 8728.06 91.06 124.88 4,001.32 2,847.82 S 2,110.46 E -2847.82 4.14 8821.34 88.99 123.99 4,001.28 2,900.57 S 2,187.39 E -2900.57 2.42 8914.73 88.35 125.12 4,003.44 2,953.52 S 2,264.28 E -2953.52 1.39 9008.00 89.10 126.44 4,005.52 3,008.04 S 2,339.93 E -3008.04 1.63 9101.31 88.91 126.25 4,007.14 3,063.33 S 2,415.08 E -3063.33 0.29 9194.71 89.60 127.51 4,008.35 3,119.38 S 2,489.78 E -3119.38 1.54 9288.01 88.95 126.35 4,009.53 3,175.43 S 2,564.35 E -3175.43 1.43 9381.40 86.65 126.35 4,013.12 3,230.74 S 2,639.51 E -3230.74 2.46 9474.85 86.54 126.45 4,018.67 3,286.10 S 2,714.59 E -3286.10 0.16 9568.19 87.07 126.47 4,023.87 3,341.48 S 2,789.55 E -3341.48 0.57 9661.61 89.33 127.31 4,026.81 3,397.52 S 2,864.22 E -3397.53 2.58 9754.95 90.40 127.52 4,027.03 3,454.24 S 2,938.36 E -3454.24 1.17 9848.32 87.89 126.79 4,028.42 3,510.62 S 3,012.76 E -3510.62 2.80 9941.68 87.37 127.23 4,032.28 3,566.77 S 3,087.24 E -3566.77 0.73 10035.17 87.52 127.11 4,036.45 3,623.20 S 3,161.67 E -3623.20 0.21 10128.53 88.26 126.97 4,039.88 3,679.40 S 3,236.14 E -3679.40 0.81 10221.85 88.35 126.67 4,042.64 3,735.30 S 3,310.81 E -3735.30 0.34 10315.17 90.10 127.24 4,043.91 3,791.39 S 3,385.37 E -3791.39 1.97 10408.69 92.04 127.85 4,042.16 3,848.37 S 3,459.50 E -3848.37 2.17 INSITE V8.0.20 Page 10Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10502.00 91.90 126.86 4,038.95 3,904.95 S 3,533.63 E -3904.95 1.07 10595.47 89.95 126.36 4,037.44 3,960.68 S 3,608.65 E -3960.68 2.15 10688.81 89.72 125.91 4,037.71 4,015.72 S 3,684.03 E -4015.73 0.54 10782.16 90.92 126.42 4,037.19 4,070.81 S 3,759.39 E -4070.81 1.40 10875.54 92.71 126.28 4,034.23 4,126.13 S 3,834.56 E -4126.13 1.92 10968.90 93.05 126.96 4,029.54 4,181.75 S 3,909.40 E -4181.75 0.81 11062.25 91.26 126.29 4,026.03 4,237.39 S 3,984.26 E -4237.39 2.05 11155.72 89.15 126.09 4,025.70 4,292.58 S 4,059.69 E -4292.58 2.27 11249.00 89.88 125.93 4,026.49 4,347.42 S 4,135.14 E -4347.42 0.80 11342.39 90.41 127.53 4,026.25 4,403.27 S 4,209.99 E -4403.27 1.80 11435.83 90.32 126.68 4,025.66 4,459.64 S 4,284.51 E -4459.64 0.91 11529.29 89.82 127.13 4,025.54 4,515.76 S 4,359.24 E -4515.76 0.72 11622.69 90.27 127.18 4,025.47 4,572.17 S 4,433.68 E -4572.17 0.48 11716.01 89.63 125.62 4,025.55 4,627.55 S 4,508.79 E -4627.55 1.81 11809.35 90.80 125.53 4,025.20 4,681.85 S 4,584.71 E -4681.85 1.26 11902.71 90.28 124.69 4,024.32 4,735.54 S 4,661.08 E -4735.54 1.06 11996.09 90.68 124.69 4,023.54 4,788.68 S 4,737.85 E -4788.68 0.43 12089.41 90.85 124.20 4,022.29 4,841.46 S 4,814.81 E -4841.46 0.56 12182.76 90.80 124.52 4,020.95 4,894.14 S 4,891.86 E -4894.14 0.35 12276.06 89.40 123.31 4,020.79 4,946.20 S 4,969.28 E -4946.20 1.98 12369.34 87.93 124.18 4,022.96 4,998.00 S 5,046.82 E -4998.00 1.83 12462.72 87.84 123.61 4,026.41 5,050.04 S 5,124.28 E -5050.04 0.62 12556.05 89.66 125.99 4,028.44 5,103.29 S 5,200.89 E -5103.29 3.21 12649.69 86.78 126.58 4,031.35 5,158.67 S 5,276.33 E -5158.67 3.14 12742.86 87.83 126.67 4,035.73 5,214.19 S 5,351.02 E -5214.19 1.13 12836.30 89.78 127.90 4,037.68 5,270.78 S 5,425.34 E -5270.78 2.47 12929.64 90.78 127.97 4,037.22 5,328.16 S 5,498.96 E -5328.16 1.07 13023.00 89.79 127.03 4,036.76 5,384.99 S 5,573.02 E -5384.99 1.46 13116.45 91.24 125.44 4,035.92 5,440.22 S 5,648.39 E -5440.22 2.30 13209.84 91.72 125.16 4,033.51 5,494.17 S 5,724.58 E -5494.17 0.59 13303.28 92.52 125.50 4,030.05 5,548.17 S 5,800.76 E -5548.17 0.93 13396.70 92.82 126.18 4,025.70 5,602.81 S 5,876.41 E -5602.81 0.79 13490.13 90.11 125.18 4,023.31 5,657.28 S 5,952.27 E -5657.28 3.09 13583.56 89.59 124.87 4,023.55 5,710.90 S 6,028.78 E -5710.90 0.65 13677.00 91.64 125.56 4,022.55 5,764.78 S 6,105.11 E -5764.78 2.31 13770.38 89.71 124.46 4,021.45 5,818.34 S 6,181.58 E -5818.34 2.38 13863.75 89.00 121.30 4,022.50 5,869.02 S 6,259.98 E -5869.02 3.47 13957.19 90.89 124.50 4,022.59 5,919.77 S 6,338.42 E -5919.77 3.98 14050.67 90.07 125.17 4,021.81 5,973.16 S 6,415.15 E -5973.16 1.13 14144.01 89.51 125.08 4,022.15 6,026.86 S 6,491.49 E -6026.86 0.61 14237.07 89.82 124.75 4,022.70 6,080.13 S 6,567.80 E -6080.13 0.49 14330.42 90.91 124.09 4,022.10 6,132.89 S 6,644.80 E -6132.89 1.37 14423.79 90.64 125.28 4,020.84 6,186.02 S 6,721.57 E -6186.02 1.31 14517.24 90.61 123.71 4,019.82 6,238.94 S 6,798.58 E -6238.94 1.68 14610.62 92.24 124.11 4,017.50 6,291.02 S 6,876.05 E -6291.02 1.80 INSITE V8.0.20 Page 11Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14703.93 91.95 124.09 4,014.09 6,343.29 S 6,953.27 E -6343.29 0.31 14797.36 89.20 123.62 4,013.15 6,395.34 S 7,030.84 E -6395.34 2.99 14890.76 91.20 123.42 4,012.82 6,446.91 S 7,108.71 E -6446.91 2.15 14984.04 89.35 120.46 4,012.37 6,496.25 S 7,187.85 E -6496.25 3.74 15077.41 88.13 119.94 4,014.43 6,543.21 S 7,268.53 E -6543.21 1.42 15159.44 89.34 120.62 4,016.24 6,584.56 S 7,339.35 E -6584.56 1.69 15225.00 89.34 120.62 4,016.99 6,617.95 S 7,395.76 E -6617.95 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (Grid) - A total correction of 0.00 deg from Magnetic north to Grid north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 15,225.00 feet is 9,924.44 feet along 131.82 degrees (Grid) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.20 Page 12Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report