Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Nabors 245
Date: May 19, 2014
Surface Data Logging
End of Well Report
OP16-03L1
OP16-03L1 PB1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Formation Tops
6. Mud Record
7. Bit Record
8. Morning Reports
9. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: Eni Petroleum
Rig: Nabors 245
Well: OP16-03L1 & OP16-03L1 PB1
Field: Nikaitchuq Field
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-029-23442-60-00 (OP16-03L1)
50-029-23442-70-00 (OP16-03L1 PB1)
Sperry Job Number: AK-AM-0901288163
Job Start Date: 19 April 2014
Spud Date: 26 April 2014
Total Depth: 17610’ MD, 3383’ TVD
North Reference: True
Declination: 19.364°
Dip Angle: 81.025°
Total Field Strength: 57622.153 nT
Date Of Magnetic Data: 30 April 2014
Wellhead Coordinates N: North 70° 30’ 39.39”
Wellhead Coordinates W: West 149° 51’ 50.00“
Drill Floor Elevation 53.86’
Ground Elevation: 12.2’
Permanent Datum: Mean Sea Level
SDL Engineers: Josiah Failing, Andy Bongard, Mike Sherry
Company Geologist: Sorin Cornea, Brent Boyd, Ed Van de Brand,
Anne Laroque
Company Representatives: Ben Perry, Craig Ruminer, Bruce Simonson,
Dean Sherman
SSDS Unit Number: 121
DAILY SUMMARY
04/19/2014
SDL continues on location from previous well. Move rig and place mats/herculite. Rig up well
head to pump down IA and pressure up. Fill pits with 9 ppg brine. Test lines. Set BPV. Nipple
down the tree.
Gas: No significant gas data.
Fluids: There were 596 barrels of Brine lost down hole.
04/20/2014
Nipple down the wellhead. Nipple up BOPs. Continue to nipple down the tree. Make up the
riser. Test BOPs. Start pulling 4.5" tubing.
Gas: No significant gas data.
Fluids: There were 0 barrels of Brine lost down hole.
04/21/2014
Pull tubing from 9159' MD to 1500' MD while filling backside with 9 ppg brine. Rig up wireline
and pull pump assembly. Rig down wireline.
Gas: No significant gas data.
Fluids: There were 441 barrels of Brine lost down hole.
04/22/2014
Continue to pull tubing. Lay down tools and motor. Prepare rig for scraper run. Load pipe shed
with drill pipe. Slip and cut drilling lines. Perform maintenance on the top drive. Make up the
BHA for a scraper run.
Gas: No significant gas data.
Fluids: There were 240 barrels of Brine lost down hole.
04/23/2014
Trip in hole with scraper assembly from 2617' to 10852' MD. Trip out of hole to 10063' MD.
Experience top drive mechanical problems. Troubleshoot and repair top drive problems. Pump
10bbls 8.8 ppg KCL brine down backside roughly every hour.
Gas: No significant gas data.
Fluids: There were 244 barrels of Brine lost down hole.
04/24/2014
Continue and finish repairing top drive. Trip out of hole to surface. Lay down the BHA. Pick up
the isolation packer assembly. Pump 10 bbls. KCL brine down backside roughly every hour.
Trip in hole and tag bottom at 10905' MD. Fill the well down the backside. Set the packer at
10905'. Test packer to 1000, 2000, and 3000 psi.
Gas: No significant gas data.
Fluids: There were 361 barrels of Brine lost down hole.
04/25/2014
Fill the annulus and pressure test isolation packer. Release from packer. Displace to clean
production brine. Trip out of hole to surface. Lay down the packer BHA. Rig up USIT wireline
loggers. Run in hole to 10856' MD on wireline. Pull out of hole with wireline and rig down
same. Clean pits. Bring OBM into pits and condition.
Gas: No significant gas data.
Fluids: There were 0 barrels of Brine lost down hole.
04/26/2014
Pick up milling tools and whipstock BHA. Trip in hole to 10394' MD. Set whipstock and sheer
BHA from whipstock. Displace from KCL brine to FazePro OBM. Begin milling window at
10396'.
Gas: The max drilling gas was 6 U. The average drilling gas was 4 U. The max trip gas was
2173 U.
Fluids: There were 6 barrels of oil-based mud lost down hole.
04/27/2014
Continue milling window from 10399' to 10437' MD. Circulate and condition mud, pump fiber
sweep. Perform formation integrity test. Pump dry job and trip out of hole to surface. Lay down
milling BHA and pick up mud motor BHA. Trip in hole to 1500' MD. Shallow hole test.
Continue Trip in hole.
Gas: The max drilling gas was 12 U. The average drilling gas was 8 U. The max trip gas was
2 U.
Fluids: There were 8 barrels of oil-based mud lost down hole.
04/28/2014
Continue tripping in hole to 10437’ MD. Drill ahead, sliding and rotating to 10778’ MD. Back
ream out of hole to 10513’ MD. Pull through window from 10413’ to 10394’ MD. Continue back
reaming out of hole to 10204’ MD. Continue tripping out of hole, pumping 40 GPM at 3 minutes
per stand to 7000’ MD. Pump dry job. Trip out of hole on elevators.
Gas: The max drilling gas was 63 U. The average drilling gas was 19 U. The max trip gas was
7 U.
Fluids: There were 58 barrels of oil-based mud lost over the shakers. Zero losses downhole.
04/29/2014
Continue to trip out of hole to surface. Lay down BHA # 4. Pick up BOP testing tools and test
BOPs. Cut and slip drill line. Pick up drill pipe from shed and makeup BHA #5 with Xceed. Trip
in hole to 1500' MD. Shallow hole test. Continue to trip in hole, filling pipe every 2500'.
Gas: No significant gas data.
Fluids: There were 2 barrels of oil-based mud lost downhole.
04/30/2014
Continue to trip in hole with 4.5" drill pipe to 7498' MD. Continue to trip in hole with 5" drill pipe
to 10430' MD. Perform open-hole logging from 10430’ to 10778' MD. Rotary drilling ahead
from 10778' to 11422' MD.
Gas: The max drilling gas was 866 U. The average drilling gas was 254 U. The current
background gas is 46 U. The max trip gas was 31 U
Fluids: There were 58 barrels of oil-based mud lost downhole.
05/01/2014
Rotary drilling ahead from 11422’ to 13242’ MD.
Gas: The max drilling gas was 958 U. The average drilling gas was 555 U. The current
background gas is 83 U.
Fluids: There were 153 barrels of oil-based mud lost downhole.
05/02/2014
Rotary drilling ahead from 13242’ to 15445’ MD.
Gas: The max drilling gas was 722 U. The average drilling gas was 336 U. The current
background gas is 55 U.
Fluids: There were 79 barrels of oil-based mud lost downhole.
05/03/2014
Rotary drill ahead from 15445' to 16882' MD. Back ream to 16499' MD. Prepare to sidetrack
well.
Gas: The max drilling gas was 740 U. The average drilling gas was 374 U. The current
background gas is 56 U.
Fluids: There were 80 barrels of oil-based mud lost downhole.
05/04/2014
Sidetrack from OP16-03L1 PB1 at 16499' MD. Rotary drill ahead from 16499' to 17552' MD.
Gas: The max drilling gas was 673 U. The average drilling gas was 180 U. The current
background gas is 71 U.
Fluids: There were 62 barrels of oil-based mud lost downhole.
05/05/2014
Rotary drill ahead from 17552' to production TD at 17610' MD, 3383' TVD. Begin to back-ream
out of hole. Back-ream out of hole to 10274' MD.
Gas: The max drilling gas was 118 U. The average drilling gas was 83 U. The current
background gas is 71 U.
Fluids: There were 135 barrels of oil-based mud lost downhole.
05/06/2014
Continue to back-ream out of the hole to 7498' MD. Service rig and top drive. Pump dry job,
and then trip out of hole on elevators to surface. Lay down BHA #5. Pickup whipstock retrieval
BHA. Trip in hole with 4.5 drill pipe to 8080' MD. Continue TIH for whipstock retrieval.
Gas: The max trip gas was 22 U.
Fluids: There were 6 barrels of oil-based mud lost downhole.
05/07/2014
Continue to trip in the hole to 10406' MD. Orientate toolface and latch onto the whipstock-
Retrieval successful. Pump dry job. Trip out of hole to surface. Lay down whipstock retrieval
BHA. Trip in hole to 10856' MD. Circulate and spot 37 bbl brine pill at 10853' MD. Pump dry
job. Trip out of hole to 7280' MD. Continue to trip out of hole.
Gas: The max trip gas was 282 U.
Fluids: There were 28 barrels of oil-based mud lost downhole.
05/08/2014
Trip out of hole with 5” drill pipe to 3671’. Cut 6 wraps of drilling line. Rig service. Trip out of
hole to surface. Clean rig/platform. Completion: pick up; lay down; make up tools/BHA as per
GBR. Run in hole with liner to 7378’. Pick up liner hanger. Prep floor and run in hole with 5”
drill pipe to 7802’. Fill pipe. Continue to run in hole to 10292’; fill pipe every 1000’ per BOT rep.
Continue to run in hole to 10856’. Tag top of packer. Pull out of hole to 10674’.
Gas: The max was 11 units; trip gas was not received.
Fluids: There were 8 barrels of oil-based mud lost downhole.
05/09/2014
Trip out of hole from 10674’ to 10393’. Trip in hole from 10393’ to 17610’; pick up 5’. Circulate
and condition. Packer set at 10186’. Displace to water-based from 10151’ to surface with 707
bbl 8.8 ppg. Displace to completion fluid. Service rig. Lay down drill pipe from 10151’ to 6837’.
Trip in hole with last 8 stands from derrick from 6837’ to 7571’. Continue to lay down drill pipe.
Gas: Max of 384 units of trip gas observed.
Fluids: There were 15 barrels of oil-based mud lost downhole.
05/10/2014
Lay down drill pipe from 900’ to 39’. Lay down BHA, change elevators, clean rig floor. Trip in
hole with 4.5” drill pipe from surface to 7230’. Circulate and condition pumping citric pill. Lay
down drill pipe from 7230’ to surface. Lay down mule shoe. Install/remove wear bushing. Pick
up 3rd party tools. Service rig. Continue to pick up tools. Rig up wireline.
Gas: Max of 2 units of gas observed.
Fluids: There were 0 barrels lost downhole.
05/11/2014
Set pump/pack-off. PSI test. Rig down test equipment and slickline. Completion: pick up, lay
down, make up tools/BHA from surface to 204’. BCL hands splice ½ mile. Change out sheave.
Start running in hole; make up cap TOOB clamp splice. Continue to pick up 4.5” tubing from
204’ to 846’ per tally; clamp every collar.
Gas: There was no significant gas observed.
Fluids: There were 0 barrels lost downhole.
05/12/2014
Completion: pick up, lay down, make up tools/BHA; cable to cable splice. Trip tubing/drill pipe.
Continue to pick up 4.5” tubing from 846’ to 5020’; clamp every collar; test every 1000’.
Continue tripping from 5020’ to 7902’. Change out spools. Make cable change splice. Trip in
hole to 8191’. Make gator splice on ESP; test same. Continue in hole to 8669’.
Gas: There was no significant gas observed.
Fluids: There were 0 barrels lost downhole.
05/13/2014
Completion: continue to run in hole with 4.5” tubing from 8669’ to 9091’. Rig down Volant tool.
Change elevators. Pick up and assemble hanger assembly. Install penetrator. Make up lower
connector splice and test as per Baker. Orient and land hanger at 9132’. Run downhole pumps
and test upper and lower seals; test good. Lay down landing joint. Clean rig floor. Nipple down
BOPs, clean up cellar. Nipple up riser and spacer spools, void riser of fluid, nipple down and
pull to rig floor. Prepare wellhead to accept tree; no visible leaks. Test tree. Mobilization:
secure floor, cellar and wellbay. Continue to prepare to move rig to OP05-06.
Gas: There was no significant gas observed.
Fluids: There were 0 barrels lost downhole.
9000
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
20000
0 5 10 15 20 25 30
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Actual
WELL NAME: OP16-03L1 & OP16-03L1 PB1
OPERATOR: Eni Petroleum
MUD CO: MI Swaco
RIG: Nabors 245
SPERRY JOB: AK-XX-0901288163
Days vs. Depth
19 April 2014
Sperry SDL remain on location
from previous well
LOCATION: Oliktok Point
AREA: Nikaitchuq Field
STATE: Alaska
SPUD: 26-Apr-2014
TD: 5-May-2014
Landed 5.5" Liner
17610' MD, 3383' TVD
09 May 2014
Drill 8.75" Prod. Build Section to
10,778' MD, 3,430' TVD
POOH to P/U 8.75" Production BHA
Off Bot: 11:30 28 Apr 2014
Commence 8.75" Prod. Build Section
On Bot: 23:00 26 Apr 2014
Mill WIndow through Casing (Spud)
TOW: 10,396' MD, 3,419' TVD
BOW: 10,413' MD, 3,420'TVD
On Bot: 23:00 26 Apr 2014
Mill 8.75" hole to 10,437' MD, 3,422' TVD
POOH to P/U 8.75" Build Section BHA
Off Bot: 04:40 27 Apr 2014
Commence 8.75" Production Section
On Bot: 15:30 30 Apr 2014
TD PB1 Production Hole Section
16882' MD, 3380' TVD
Off Bot: 20:45 03 May 2013
TD Production Hole Section
17610' MD, 3383' TVD
Off Bot: 00:40 05 May 2013
Open-hole Sidetrack
Kick-off at 16499' MD, 3401' TVD
Commence 8.75" Production Section
On Bot: 02:05 04 May 2014
WELL NAME:LOCATION:Oliktok Point
OPERATOR:AREA:Nikaitchuq Field
SPERRY JOB:STATE:Alaska
RIG:Doyon 15 HOLE SECTION Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
What went as, or better than, planned:
We experienced about a 200' gap in THA gas data due to the genie filter being plugged up in the THC.
The filter was changed at the beginning of the well, but with all the condensation that flows through the
sample line, it's useful life is minimized.
Recommendations:
Innovations and/or cost savings:
Communication with the remote computers worked as designed.
Difficulties experienced:
Change the genie filter after each run. Monitor the sample flow volume, and if the flows drop change
the genie filter out during a connection. Other jobs experiencing moisture issues should install the new
moisture eliminating dropout jar.
N/A
ENI Petroleum
AK-XX-0901288163
Andew Bongard 7-May-2014
OP16-03L1
Surface Data Logging
After Action Review
WELL NAME:OP16-03L1 LOCATION:Oliktok Point
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:26-Apr-2014
SPERRY JOB:AK-XX-0901288163 TD:5-May-2014
Marker MD INC AZ TVD TVDSS
8 3/4" OP16-03L1 Borehole
TOW 10,396.0 85.2 310.0 3,419.6 -3,365.7
BOW 10,413.0 85.7 294.3 3,421.0 -3,367.1
OA-Sand Top 11,197.0 87.9 331.9 3,431.0 -3,377.1
OA-2 12,340.0 88.0 313.7 3,440.6 -3,386.7
OA-3 12,599.0 89.7 316.6 3,447.5 -3,393.7
OA-3 14,009.0 92.9 287.7 3,437.0 -3,383.1
OA-2 14,325.0 93.3 289.3 3,423.6 -3,369.7
Fault 1 14,843.0 89.2 295.0 3,415.7 -3,361.8
Fault 2 15,037.0 87.0 292.3 3,421.6 -3,367.8
OA-4 15,181.0 88.5 292.2 3,427.4 -3,373.5
OA-Sand Bottom 15,234.0 87.9 292.1 3,429.0 -3,375.1
OA-Sand Bottom 15,458.0 94.9 291.5 3,426.8 -3,372.9
OA-4 15,518.0 94.9 291.7 3,421.4 -3,367.5
Fault 3 16,787.0 91.7 300.7 3,394.6 -3,340.8
Fault 4 17,010.0 85.5 307.1 3,399.5 -3,345.7
OA-4 17,037.0 86.1 307.1 3,401.5 -3,347.7
OA-4 17,145.0 88.2 307.6 3,406.8 -3,352.9
Fault 5 17,327.0 92.7 311.6 3,405.1 -3,351.3
TD 8 3/4" Borehole 17,610.0 95.1 318.9 3,383.3 -3,329.4
8 3/4" OP16-03L1 PB1 Borehole
Sidetrack Point 16,499.0 92.9 292.7 3,401.0 -3,347.1
OA-3 16,690.0 93.6 299.1 3,388.5 -3,334.6
Fault 3 16,780.0 92.4 301.0 3,383.7 -3,329.8
TD 8 3/4" PB1 16,881.0 91.9 301.6 3,380.2 -3,326.3
Formation Tops
OP16-03L1 & OP16-03L1 PB1 Oliktok Point
Eni Petroleum Nikaitchuq Field
MI Swaco Alaska
Nabors 245 26-Apr-2014
AK-XX-0901288163 5-May-2014
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/R
6/R3 Cake Solids Oil/Water Sd Pm pH Chlor
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%mg/l
19-Apr 10880 9.00 27 -----------52000 Move rig, N/D tree, rig up
20-Apr 10880 9.00 27 -----------57500 N/U and test BOPs, pull tubing
21-Apr 10880 8.80 27 -----------48000 Pull tubing, perform wireline
22-Apr 10880 8.50 27 -----------48500 P/U drill pipe, prepare for scraper run
23-Apr 10880 8.80 28 -----------48500 Scraper run, troubleshoot top drive
24-Apr 10880 8.80 27 -----------48500 Run and test packer, displace to OBM
25-Apr 10880 8.80 27 -----------48000 Prepare to M/U BHA
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/R
6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Elec Stab LGS/HGS Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb
26-Apr 10399 8.8 45 11 16 7/8/8 4.4 38/27/22/17/7/6 -8.22 70/30 2.4 3.12 595 -Milling Window
27-Apr 10437 8.8 46 9 16 7/7/8 -34/25/20/15/7/6 -8.7 70/30 2.4 3.12 563 -RIH w/ mud motor BHA
28-Apr 10778 8.8 49 13 22 8/8/9 5.0 48/35/30/18/8/7 1 7.72 71/29 2 2.6 688 -Production Build TD + BROOH
29-Apr 10778 8.8 49 12 18 7/8/8 5.4 42/30/26/21/8/7 1 7.76 71/29 2 2.6 630 -Test BOPs, TIH w/ BHA #5
30-Apr 11230 8.8 47 14 21 8/9/9 5.4 49/35/29/23/8/7 1 8.95 71/29 1.7 2.21 682 -Drill Ahead
1-May 13242 8.8 43 12 13 7/7/8 4.8 37/25/21/15/7/6 1 8.77 76/24 2 2.6 639 -Drill Ahead
2-May 15310 8.8 44 13 13 7/7/8 5.0 39/26/21/16/7/6 1 10 75/25 2.5 3.25 505 -Drill Ahead
3-May 16881 8.8 45 13 15 7/7/8 5.2 41/28/23/17/7/6 1 9.91 75/25 2.8 2.93 558 -Drill Ahead, Openhole Sidetrack
4-May 17193 8.85 46 13 15 7/8/8 5.2 41/28/23/17/7/6 1 9.74 66/34 2.9 3.77 510 -DrillAhead
5-May 17610 8.85 46 13 16 7/8/8 5.0 42/29/24/18/8/7 1 8.84 73/27 3 3.9 511 -BROOH
6-May 17610 8.85 48 15 14 7/7/8 5.2 44/26/24/19/8/7 1 10 73/27 2.5 3.25 508 -BROOH, TOOH, L/D BHA
7-May 17610 8.8 48 15 14 7/7/8 5.2 44/29/23/20/8/7 1 10 73/27 2.35 3.06 510 -TIH, Spot Brine Pill, TOOH
8-May 17610 8.8 48 15 14 7/7/8 5.2 44/29/23/20/8/7 1 10 73/27 2.35 3.06 510 -RIH with liner
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/R
6/R3 Cake Solids Oil/Water Sd Pm pH Chlor
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%mg/l
9-May 17610 8.80 -------------Set liner, TOOH, displace w/ brine
10-May 17610 8.80 -------------TIH w/ 4.5", TOOH & LD 4.5"
11-May 17610 8.80 -------------
12-May 17610 8.80 -------------
Casing Record
Remarks
9.625" Casing @ 10396' MD, 3419'TVD
5.5" Liner @ 17610' MD, 3383' TVD
Remarks
WELL NAME:LOCATION:
OPERATOR:AREA:
MUD CO:STATE:
RIG:SPUD:
SPERRY JOB:TD:
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
4 200 1 Mill 8.75 10396 10437 41 5.96 N/A 6.9 8.8 96 1346 429 -Mill Out Casing
5 300 2 Milled Tooth XR+8.75 10437 10779 342 6.70 0.746 51.0 15 70 1580 420 1-1-WT-A-E-I-NO-BHA 8.75" Production Build Section
6 500 3 MDSi616-BPX 8.75 10779 16881 6102 -0.902 ------TD PB1 Production Section
6 600 3 MDSi616-BPX 8.75 16499 17610 1111 59.80 0.902 120.6 2 120 2750 500 0-0-NO-A-X-I-NO-TD Open-hole Sidetrack BHA
WELL NAME:OP16-03L1 & OP16-03L1 PB1 LOCATION:Oliktok Point
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:
SPERRY JOB:AK-XX-0901288163 TD:5-May-2014
MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:26-Apr-2014
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / M.Sherry
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
Test lines, set BPV. Nipple down tree.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Ruminer
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-xx
Rig up
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No gas readings
ConditionBit #
8.80
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
OP16-03L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
19-Apr-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
44500.00
Move rig and place mats / herculite. Rig up on well head to pump down IA and pressure up. Fill pits with 9 ppg Brine.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Nipple down wellhead, nipple up BOPs. Continue nipple down tree, make up riser. Test BOPs. Start pull 4.5" tubing.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
44500.00
0
20-Apr-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
OP16-03L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
9.00
Size
No gas readings
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-xx
POOH Tubing
PV
Footage
Perry / Ruminer
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / M.Sherry
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / M.Sherry
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
assembly. Rig down wireline.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Ruminer
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901288163
POOH Tubing
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No gas readings
ConditionBit #
9.00
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
OP16-03L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
21-Apr-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
44500.00
Pull tubing from 9159' MD to 1500' MD while filling backside with 9 ppg brine. Rig up wireline and pull pump
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Continue pull tubing. Lay down tools and motor. Prepare rig for scraper run. Load pipe shed with drill pipe.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
44500.00
0
22-Apr-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
OP16-03L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
9.00
Size
No gas readings
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901288163
MU Scraper BHA
PV
Footage
Perry / Ruminer
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
Slip and cut drilling lines. Maintenance on top drive. Make up BHA for scraper run.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / M.Sherry
Set AtSize Grade
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size Grade
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / M. Sherry
0
0
-
-
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
28
C-5n
-
-
C-2
-
in
--Minimum
Depth
Time:
and repair top drive problems. Pump 10bbls 8.8 ppg KCL brine down backside roughly every hour.
-
-
-
-
Max @ ft Current
--
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901288163
Repairing Top Drive
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
--Background
(max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
WOB
100% Gas In Air =10,000 Units -Connection
0
No Gas Readings
Condition Bit #
8.80
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 245E Report For:
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
OP16-03L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
23-Apr-2014
12:00 AM
Current Pump & Flow Data:
-
Max
0
Chlorides
mg/l
48500.00
TIH w/ scraper assembly f/ 2617' t/ 10852' MD. TOOH t/ 10063' MD. Top drive mechanical problems. Troubleshoot
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: Continue and finish repairing top drive. TOOH t/ surface. L/D BHA. P/U isolation packer assembly. Pump 10 bbls
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
48500.00
0
24-Apr-2014
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
OP16-03L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 245E Report For:
Condition Bit #
8.80
Size
No Gas Readings
Test packer to 1000, 2000, and 3000 psi.
100% Gas In Air =10,000 Units -Connection
0
Tools
-
API FL
Chromatograph (ppm)
WOB
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
-Background
(max)
Trip
Average
-
Mud Type
Lst
Type
KCL Brine
Depth in / out
YP
(lb/100ft 2)
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901288163
Test Packer
PV
Footage
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
--
Date:
Time:
KCL brine down backside roughly every hour. TIH and tag bottom @ 10905' MD. Fill well down backside. Set packer @ 10905'.
-
in
--Minimum
Depth C-5n
-
-
C-2
-
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
-
-
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / M. Sherry
Set At Size Grade
(max) (current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size Grade
907-685-1490 Unit Phone:
0
Josiah Failing
Maximum
Report By: Logging Engineers: J. Failing / A. Bongard
0
0
-
-
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
27
C-5n
-
-
C-2
-
in
--Minimum
Depth
Time:
t/ surface. L/D packer BHA. R/U USIT wireline loggers. RIH t/ 10856' MD w/ wireline. POOH w/ wireline and R/D. Clean pits.
-
No other gas readings
-
10905'
-
Max @ ft Current
--
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Perry / Ruminer
Sh Clyst Tuff Gvl Coal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901288163
Pepare to M/U BHA
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
KCL Brine
Depth in / out
Mud Type
Lst
Type
Average
8365 -Background
(max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
WOB
100% Gas In Air =10,000 Units -Connection
0
Max gas during displacement to clean brine: 8365 (gas bubble)
Bring OBM into pits and condition.
Condition Bit #
8.80
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 245E Report For:
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
OP16-03L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
25-Apr-2014
12:00 AM
Current Pump & Flow Data:
-
Max
0
Chlorides
mg/l
48000.00
Fill annulus and pressure test isolation packer. Release from packer. Displace to clean production brine. TOOH
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
Report By:
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
Depth in / out Bit Type RPM
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
Milling Window
Simonson / Ruminer
907-685-1490 Unit Phone:
0
Josiah Failing
Set At Size
40 # L-80
Grade
84
C-2
Gas Summary
Eni Petroleum AK-AM-0901288163
26-Apr-2014
12:00 AM
10396'
10399'
3'
0
1
0
1
118
0 0
107
6
10398'Minimum
Depth
Maximum
in
2
10396'
0
1 0
from KCL brine to FazePro OBM. Begin milling window @ 10396'.
4
Cumulative daily mud losses: 4 bbls
427
Alkal
Coal
Gallons/stroke
0
Lime
Tuff Gvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
101
SPP (psi)
Max @ ft
10399'
Date:
Time:
API FL
Depth
0'
Avg
to 0'
Current
2.2 1.4
(current)
Units*
Clyst Ss Cht Silt
Casing
Summary
Lithology (%)
-
11 45
Footage
PV
cP
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
0
Cement
C-1 C-5i
Sh Siltst
Chromatograph (ppm)
0 1
00
C-4i C-4n
0
Lst
(lb/100ft 2)
8.80
Type
16
Mud (lb/bbl) ml/30min
3.12 2.40
C-3
Average
2173 Trip
(max)
0
Comments
2Background
100% Gas In Air =10,000 Units -Connection
Max gas while displacing to OBM: 2173 units
Max gas while milling: 6 units
Bit #
0 8.5 10396'
Size
TOW @ 10396'BOW @ 10413'Hydril 563
-
WOB
Window Mill
TFA Condition
MWD Summary
96%
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
70-30
4.23 @
Current Pump & Flow Data:
Report For:
10394'8.2
- -
Cor Solids
-
Avg Min
YP
Max ECD (ppg)
Tools
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
2.8
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
1320
ROP
ROP (ft/hr)
24 hr Max
P/U milling tools and whipstock BHA. TIH t/ 10394' MD. Set whipstock and sheer BHA from whipstock. Displace
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
Continue milling window f/ 10399' t/ 10437' MD. Circulate and condition mud, pump fiber sweep. FIT test. Pump
-
ROP
ROP (ft/hr)
24 hr Max
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
30.8
Min
YP
Max ECD (ppg)
Tools
Telescope 675
@
Current Pump & Flow Data:
Report For:
10394'8.7
- -
Cor Solids
96%
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
70-30
4.23
BOW @ 10413'Hydril 563
-
WOB
Smith Milled Tooth XR+
TFA Condition
1 8.75 10437'
0 10396'
Max gas during trip: 2 units
Max gas while milling: 12 units
100% Gas In Air =10,000 Units -Connection
Comments
Background
TOW @ 10396'
Trip
(max)
2Average
2
(lb/bbl) ml/30min
3.12 2.40
41'
8.80
Type
16
Window Mill
Mud
C-3
Bit #
0
Lst
00
C-4i C-4n
Chromatograph (ppm)
4 3
0
Cement
C-1 C-5i
Sh Siltst
cP
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
(lb/100ft 2)
Casing
Summary
Lithology (%)
0.746
946
8.5 -
Footage
(current)
Units*
Clyst Ss Cht Silt
Depth
-
Avg
to 10437'
Current
13.4 -
MWD Summary
Max @ ft
10437'
Date:
Time:
API FL PV
-
Avg
0
Lime
Tuff Gvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi) -
Alkal
Coal
Gallons/stroke
dry job and TOOH t/ surface. L/D milling BHA and P/U mud motor BHA. TIH t/ 1500' MD. Shallow hole test. Continue TIH.
8
Daily mud losses: 8 bbls
10425'
0
2 0
10430'Minimum
Depth
Maximum
in
2 0
650 0
1
0
2
1175
0
Eni Petroleum AK-AM-0901288163
27-Apr-2014
12:00 AM
10399'
10437'
38'
86
C-2
Gas Summary
12
907-685-1490 Unit Phone:
0
Josiah Failing
Set At Size
40 # L-80
Grade
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
TIH
Simonson / Ruminer
Depth in / out Bit Type RPM
10437'
Size
Report By:
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
.
.
*
24 hr Recap:
Report By:
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
Bit Type RPM
10437'
Size
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
TOOH
Simonson / Ruminer
907-685-1490 Unit Phone:
0
Josiah Failing
Set At Size
40 # L-80
Grade
C-2
Gas Summary
63
28-Apr-2014
12:00 AM
10437'
10778'
341'
Depth in / out
1
7
0
4
7373
0106 0
2197
10455'Minimum
Depth
Maximum
in
2
10664'
0
8 2
window f/ 10413' t/ 10394' MD. BROOH t. 10204' MD. TOOH, pumping @ 3 mins per stand 40 GPM t/ 7000'. Pump dry job. TOOH.
19
Daily mud losses: 58 bbls total
-
Alkal
Coal
Gallons/stroke
0
Lime
Tuff Gvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Depth
10778'
Avg
to 10437'
Current
61.7 -
MWD Summary
(current)
Units*
Clyst Ss Cht Silt
Casing
Summary
Lithology (%)
0.746
13 49
341'
8.5 -
Footage
Siltst
cP
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
(lb/100ft 2)
20
0
Cement
C-1 C-5i
Sh
02
C-4i C-4n
Lst
Chromatograph (ppm)
35
Type
22
Window Mill
Mud
C-3
Bit #
0
(lb/bbl) ml/30min
2.60 2.00
41'
Average
7Trip
(max)
7
Comments
-Background
TOW @ 10396'
100% Gas In Air =10,000 Units -Connection
Max gas while BROOH: 7 units
Max gas while drilling: 63 units
1 8.75 10437'
0 10396'
BOW @ 10413'Hydril 563
10778'
WOB
Smith Milled Tooth XR+
TFA Condition
8.80
96%
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
71-29
4.23 @
Current Pump & Flow Data:
Report For:
10778'7.7
- -
Cor Solids
Min
YP
Max ECD (ppg)
Tools
Telescope 675
API FL PV
-
Avg
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
213.7
Max @ ft
10712'
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
Date:
Time:
Eni Petroleum AK-AM-0901288163
-
ROP
ROP (ft/hr)
24 hr Max
Continue TIH t/ 10437' MD. Drill ahead, sliding and rotating t/ 10778' MD. BROOH t/ 10513' MD. Pull through
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap: Continue TOOH t/ surface. L/D BHA # 4. P/U BOP testing tools and test BOPs. Cut and slip drill line. P/U drill pipe
-
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
Rig:
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
-
Max @ ft
-
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Min
YP
Max ECD (ppg)
Tools
Xceed675,PeriScope675,TeleScope675,NeoScope
API FL PV
-
Avg
@
Current Pump & Flow Data:
Report For:
10778'7.8
- -
Cor Solids
96%
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
71-29
4.23
BOW @ 10413'Hydril 563
WOB
MDSi616-BPX
TFA Condition
8.80
2 8.75 10778'
1-1-WT-A-E-I-NO-BHA 1 10437' 6.70
No Trip Gas
100% Gas In Air =10,000 Units -Connection
Comments
-Background
TOW @ 10396'
Trip
(max)
0Average
0
ml/30min
2.60 2.00
341' 15
18
Smith Milled Tooth XR+
Mud
C-3
Bit #
0
(lb/bbl)
Lst
Chromatograph (ppm)
0
00
C-4i C-4n
Cement
C-1 C-5i
Sh Siltst
cP
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
(lb/100ft 2)
Casing
Summary
Lithology (%)
0.902
12 49
8.75 0.746
Footage
(current)
Units*
Clyst Ss Cht Silt
-
Avg
to 10778'
Current
--
MWD Summary
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Coal
Gallons/stroke
0
Lime
Tuff Gvl
C-5n
0
0
from shed and makeup BHA #5 w/ Xceed. TIH t/ 1500' MD. Shallow hole test. TIH, filling pipe every 2500'.
-
Daily mud losses: 2 bbls
in
-
-
0
0 0
0
-Minimum
Depth
Maximum
0
0
0
0
0
00
29-Apr-2014
12:00 AM
10778'
10778'
0'
Depth in / out
-
Alkal
C-2
Gas Summary
-
0
907-685-1490 Unit Phone:
0
Josiah Failing
Set At Size
40 # L-80
Grade
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
TIH
Simonson / Ruminer
Bit Type RPM
10778' 70
Size
Type
Report By:
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
.
.
*
24 hr Recap:
Report By:
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
Bit Type RPM
10778' 70
Size
Type
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
Drill Ahead
Simonson / Sherman
907-685-1490 Unit Phone:
43
Josiah Failing
Set At Size
40 # L-80
Grade
Gas Summary
866
0
30-Apr-2014
12:00 AM
10778'
11422'
644'
Depth in / out
490
Alkal
110
96342
023
24293
11176'Minimum
Depth
Maximum
in
2
11351'
0
194 74
Open hole logs f/ 10430 t/ 10778' MD. Rotary drilling ahead f/ 10778' t/ 11422' MD.
254
Daily mud losses: 58 bbls
480
Gallons/stroke
0
Lime
Tuff Gvl
C-5n
0
170
Yesterday's Depth:
Current Depth:
24 Hour Progress:
116
SPP (psi)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
11422'
Avg
to 10778'
Current
170.0 198.0
MWD Summary
(current)
Units*
Clyst Ss Cht Silt
Casing
Summary
Lithology (%)
0.902
14 47
8.75 0.746
Footage
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
(lb/100ft 2)
Cement
C-1 C-5i
Sh Siltst Coal
17 46
C-4i C-4n
40
Chromatograph (ppm)
651
0
C-2 C-3
Bit #
0
(lb/bbl)
Lst
31
ml/30min
2.21 1.70
341' 15
21
Average
46 Background Trip
154
100% Gas In Air =10,000 Units -Connection
1 10437' 6.70
Trip gas: 31 units
Max gas while drilling: 866 units
MDSi616-BPX
TFA Condition
8.80
2 8.75 10778'
4.23
BOW @ 10413'Hydril 563
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
71-29
Mud cP
Current Pump & Flow Data:
Report For:
10778'9.0
10.25 11.77
Cor Solids
96%
Min
YP
Max ECD (ppg)
Tools
Xceed675,PeriScope675,TeleScope675,NeoScope
API FL PV
10.76
Avg
Max @ ft
11334'
Morning Report Report # 12
Customer:
Well:
Area:
Location:
@
Rig:
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
2310
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
241.0
Continue TIH w/ 4.5" drill pipe t/ 7498' MD. Shallow hole test @ 2600' MD. Continue TIH w/ 5" drill pipe t/ 10430' MD.
(max)
.
.
*
24 hr Recap:
Max gas while drilling: 958 units
Daily mud losses: 153 bbls
Rotary drill ahead f/ 11422' t/ 13242' MD.
(max)
2410
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
245.0
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
Max @ ft
12577'
Morning Report Report # 13
Customer:
Well:
Area:
Location:
@
Rig:
Min
YP
Max ECD (ppg)
Tools
Xceed675,PeriScope675,TeleScope675,NeoScope
API FL PV
10.54
Avg
Current Pump & Flow Data:
Report For:
10778'8.8
10.19 10.82
Cor Solids
96%
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
76-24
Mud cP
4.23
BOW @ 10413'Hydril 563
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
MDSi616-BPX
TFA Condition
8.80
2 8.75 10778'
1 10437' 6.70
Daily mud losses: 153 bbls
100% Gas In Air =10,000 Units -Connection 83 Background Trip
434 Average
-
ml/30min
2.60 2.00
341' 15
13
Bit #
0
(lb/bbl)
Lst
0
C-2 C-3
186
Chromatograph (ppm)
753
Cement
C-1 C-5i
Sh Siltst Coal
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
(lb/100ft 2)
Casing
Summary
Lithology (%)
0.902
12 43
8.75 0.746
Footage
(current)
Units*
Clyst Ss Cht Silt
13242'
Avg
to 10778'
Current
183.0 189.0
MWD Summary
Yesterday's Depth:
Current Depth:
24 Hour Progress:
118
SPP (psi)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Gallons/stroke
0
Lime
Tuff Gvl
C-5n
0
286 657
C-4i C-4n
116 230
0
346 180
555
12186'Minimum
Depth
Maximum
in
3
395
104390
040
56498
1-May-2014
12:00 AM
11422'
13242'
1820'
Depth in / out
500
Alkal
Gas Summary
958
0
11631'
907-685-1490 Unit Phone:
104
Josiah Failing
Set At Size
40 # L-80
Grade
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
Drill Ahead
Simonson / Sherman
Bit Type RPM
10778' 70
Size
Type
Report By:
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
.
.
*
24 hr Recap:
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
Max gas while drilling: 722 units
Bit Type RPM
10778' 70
Size
Type
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
Drill Ahead
Simonson / Sherman
13386'
907-685-1490 Unit Phone:
126
Josiah Failing Report By:
722
0
Depth in / out
475
Alkal
Gas Summary
Set At Size
40 # L-80
2-May-2014
12:00 AM
13242'
15445'
2203'
Grade
14758'Minimum
Depth
Maximum
in
2
336 288
83237
134 211
543
C-4i C-4n
374
Gallons/stroke
0
Lime
Tuff Gvl
C-5n
0
312
Yesterday's Depth:
Current Depth:
24 Hour Progress:
116
SPP (psi)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
13242'
Avg
to 10778'
Current
186.5 189.0
MWD Summary
(current)
Units*
Clyst Ss Cht Silt
Casing
Summary
Lithology (%)
0.902
13 44
8.75 0.746
Footage
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
(lb/100ft 2)
Cement
C-1 C-5i
Sh Siltst Coal
Chromatograph (ppm)
622
0
221
021
C-3
170 36117
Lst
0
C-2
ml/30min
3.25 2.50
341' 15
13
(lb/bbl)
Average
-55 Background Trip
298
=10,000 Units -Connection
0
1 10437' 6.70
Daily mud losses to formation: 79 bbls
MDSi616-BPX
TFA Condition
8.80
2 8.75 10778'
Bit #
4.23
BOW @ 10413'Hydril 563
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
75-25
Mud cP
Current Pump & Flow Data:
Report For:
15310'10.0
10.22 11.23
Cor Solids
96%
Min
YP
Max ECD
(ppg)
Tools
Xceed675,PeriScope675,TeleScope675,NeoScope
API FL PV
10.67
Avg
Max @ ft
13624'
Morning Report Report # 14
Customer:
Well:
Area:
Location:
@
Rig:
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
2480
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
245.0
Rotary drill ahead f/ 13242' t/ 15445' MD.
(max)
100% Gas In Air
.
.
*
24 hr Recap: Rotary drill ahead f/ 15445' t/ 16882' MD. Back ream t/ 16499' MD. Prepare to sidetrack well.
(max)
100% Gas In Air
2800
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
248.7
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
Max @ ft
15926'
Morning Report Report # 15
Customer:
Well:
Area:
Location:
@
Rig:
Min
YP
Max ECD
(ppg)
Tools
Xceed675,PeriScope675,TeleScope675,NeoScope
API FL PV
10.67
Avg
Current Pump & Flow Data:
Report For:
16881'9.9
10.22 11.23
Cor Solids
96%
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
75-25
Mud cP
4.23
BOW @ 10413'Hydril 563
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
MDSi616-BPX
TFA Condition
8.80
2 8.75 10778'
Bit #
1 10437' 6.70
Daily mud losses to formation: 80 bbls
-Connection
0
56 Background Trip
300 Average
-
ml/30min
3.64 2.80
341' 15
15
(lb/bbl)
0
C-2
161 39280
Chromatograph (ppm)
664
0
198
047
C-3
Cement
C-1 C-5i
Sh Siltst Coal
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
(lb/100ft 2)
Casing
Summary
Lithology (%)
0.902
13 45
8.75 0.746
Footage
Clyst Ss Cht Silt Lst
16881'
Avg
to 10778'
Current
177.7 -
MWD Summary
Yesterday's Depth:
Current Depth:
24 Hour Progress:
120
SPP (psi)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Gallons/stroke
0
Lime
Tuff Gvl
C-5n
0
322 560
C-4i C-4n
342
119 181
=10,000 Units
374 265
Minimum
Depth
Maximum
in
5
(current)
Units*
3-May-2014
12:00 AM
15445'
16881'
1436'
Grade
Depth in / out
507
Alkal
Gas Summary
Set At Size
40 # L-80
740
016096'
87527 15760'
907-685-1490 Unit Phone:
102
Josiah Failing Report By:
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
Prepare for Sidetrack
Simonson / Sherman
Bit Type RPM
10778' 70
Size
Type
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
Max gas while drilling: 740 units
.
.
*
24 hr Recap:
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
Max gas while drilling: 673 units
10778' 70
Size
Type
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
Drill Ahead
Simonson / Sherman
16751'
907-685-1490 Unit Phone:
58
Josiah Failing Report By:
673
017234'
82259
Depth in / out
494
Alkal
Gas Summary
Set At Size
40 #
4-May-2014
12:00 AM
16881'
17552'
671'
Grade
RPM
Minimum
Depth
Maximum
in
8
(current)
Units*
180 91 57 71
=10,000 Units
380
C-4i C-4n
210
Gallons/stroke
0
Lime
Tuff Gvl
C-5n
0
217
Yesterday's Depth:
Current Depth:
24 Hour Progress:
122
SPP (psi)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
17552'
Avg
to 10778'
Current
147.3 91.0
MWD Summary
Ss Cht Silt Lst
Casing
Summary
Lithology (%)
0.902
13 46
8.75 0.746
Footage
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
(lb/100ft 2)
Siltst Coal
Weight
Clyst
L-80
128
032
C-3
Cement
C-1 C-5i
Sh
68 18635
0
C-2
Chromatograph (ppm)
531
ml/30min
3.77 2.90
341' 15
15
(lb/bbl)
Average
-71 Background Trip
116
-Connection
0
0
1 10437' 6.70
Daily mud losses to formation: 62 bbls
MDSi616-BPX
TFA Condition
8.85
2 8.75 10778'
Bit # Bit Type
4.23
BOW @ 10413'Hydril 563
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
66-34
Mud cP
Current Pump & Flow Data:
Report For:
17193'9.7
10.53 11.33
Cor Solids
96%
Min
YP
Max ECD
(ppg)
Tools
Xceed675,PeriScope675,TeleScope675,NeoScope
API FL PV
11.02
Avg
Max @ ft
16711'
Morning Report Report # 16
Customer:
Well:
Area:
Location:
@
Rig:
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
2830
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
239.5
Sidetrack from OP16-03L1 PB1 @ 16499' MD. Rotary drill ahead f/ 16499' t/ 17552' MD.
(max)
100% Gas In Air
.
.
*
24 hr Recap: Rotary drill ahead f/ 17552' t/ production TD @ 17610' MD, 3383' TVD. Begin BROOH. BROOH t/ 10274' MD.
(max)
100% Gas In Air
1480
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
172.9
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
Max @ ft
17559'
Morning Report Report # 17
Customer:
Well:
Area:
Location:
@
Rig:
Min
YP
Max ECD
(ppg)
Tools
Xceed675,PeriScope675,TeleScope675,NeoScope
API FL PV
10.88
Avg
Current Pump & Flow Data:
Report For:
17193'8.8
10.88 11.00
Cor Solids
96%
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
73-27
Mud cP
4.23
BOW @ 10413'Hydril 563
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
TFA Condition
8.85
2 8.75 10778'
Bit # Bit Type
MDSi616-BPX
Max gas while BROOH: 73 units
-Connection
0
0
71 Background Trip
(lb/bbl)
Average
73
0
C-2
Chromatograph (ppm)
62
39 31 8243
025
C-3
Cement
C-1 C-5i
Sh
Oil / Water
Hours
(lb/100ft 2)
Siltst
Weight
Clyst
13 46
8.75 0.746
Footage
341'
16
10437' 6.70
Lst
Casing
Summary
Lithology (%)
L-80
130.6 -
MWD Summary
Ss Cht Silt
0.902
1
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
17610'
Avg
to 10778'
Current
41
Yesterday's Depth:
Current Depth:
24 Hour Progress:
95
SPP (psi) Flow In (gpm)
Flow In (spm)
Coal
0
Lime
Tuff Gvl
C-5n
0
38
ml/30min
38
C-4i C-4n
38
32 30
=10,000 Units
83
Daily total mud losses: 135 bbls
27
Minimum
Depth
Maximum
in
8
(current)
Units*
5-May-2014
12:00 AM
17552'
17610'
58'
Grade
RPM
Gallons/stroke
3.90 3.00
Depth in / out
394
Alkal
Gas Summary
Set At Size
40 #
118
017597'
13090 17608'
907-685-1490 Unit Phone:
17
Josiah Failing Report By:
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
BROOH
Simonson / Sherman
10778' 70
Size
Type
15
9 5/8"
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
Max gas while drilling: 118 units
.
.
*
24 hr Recap:
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
10778' 70
120.0
Size
Type
15
5.0
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
TIH
Simonson / Sherman
-
907-685-1490 Unit Phone:
0
Josiah Failing Report By:
-
0-
0
Depth in / out
-
Alkal
Gas Summary
Set At Size
40 #
6-May-2014
12:00 AM
17610'
17610'
0'
Grade
RPM
Gallons/stroke
3.90 3.00
Minimum
Depth
Maximum
in
-
(current)
Units*
P/U whipstock retrieval BHA. TIH w/ 4.5 drill pipe t/ 8080' MD. Continue TIH for whipstock retrieval.
-
Daily total mud losses: 6 bbls
0 00
=10,000 Units
0
C-4i C-4n
0
0
Lime
Tuff Gvl
C-5n
0
0
ml/30min
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi) Flow In (gpm)
Flow In (spm)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
17610'
Avg
to 10778'
Current
--
MWD Summary
Ss Cht Silt
0.902
1
Lst
Casing
Summary
Lithology (%)
L-80
Coal
9 5/8"
13 46
7214'
8.75 0.746
Footage
341'
16
10437' 6.70
Oil / Water
Hours
(lb/100ft 2)
Siltst
Weight
Clyst
00
C-3
Cement
C-1 C-5i
Sh
0 00
0
C-2
Chromatograph (ppm)
0 0
(lb/bbl)
Average
22 -Background Trip
MDSi616-BPX
Max gas while BROOH: 22 units
-Connection
0
0
TFA Condition
0-0-NO-A-X-I-NO-TD
8.85
2 8.75 10778'
Bit # Bit Type
59.80
4.23
BOW @ 10413'Hydril 563
17610'
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
73-27
Mud cP
Current Pump & Flow Data:
Report For:
17610'8.8
9.76 9.88
Cor Solids
96%
Min
YP
Max ECD
(ppg)
Tools
Xceed675,PeriScope675,TeleScope675,NeoScope
API FL PV
10.24
Avg
Max @ ft
-
Morning Report Report # 18
Customer:
Well:
Area:
Location:
@
Rig:
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
-
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
-
Continue BROOH t/ 7498' MD. Service rig and top drive. Pump dry job, TOOH on elevators t/ surface. L/D BHA #5.
(max)
100% Gas In Air
.
.
*
24 hr Recap: Continue TIH t/ 10406' MD. Orientate toolface and latch on to whipstock. Retrieval successful. Pump dry job. TOOH
(max)
100% Gas In Air
-
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
-
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
Max @ ft
-
Morning Report Report # 19
Customer:
Well:
Area:
Location:
@
Rig:
ECD
(ppg)
Tools
-
API FL PV
-
Avg
17610'10.0
- -
Cor Solids
Min
YP
Max
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
73-27
Mud cP
4.23
BOW @ 10413'Hydril 563
17610'
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
TFA Condition
0-0-NO-A-X-I-NO-TD
8.80
2 8.75 10778'
Bit # Bit Type
59.80
Trip gas: 282 units while TIH
0
-Connection
0
Background Trip
Average
282 -
0
0
C-2
Chromatograph (ppm)
0
0
00
C-3
Cement
C-1 C-5i
Sh
Oil / Water
Hours
(lb/100ft 2)
Siltst
Weight
Clyst
15 48
7214'
8.75 0.746
Footage
341'
14
10437' 6.70
Casing
Summary
Lithology (%)
L-80
Coal
9 5/8"
Ss Cht Silt
0.902
1
Lst
MDSi616-BPX
-
Avg
to -
Current
--
MWD Summary
Flow In (gpm)
Flow In (spm)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Current Pump & Flow Data:
Report For:
96%
0
ml/30min
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
0
(lb/bbl)
0
0
Lime
Tuff Gvl
C-5n
0
00
=10,000 Units
t/ surface. L/D whipstock retrieval BHA. TIH t/ 10856' MD. Circulate and spot 37 bbl brine pill @ 10853' MD. Pump dry job. TOOH
-0
Daily total mud losses: 28 bbls
0
in
-
(current)
Units*
0
2.35
Minimum
Depth
Maximum
C-4i C-4n
40 #
7-May-2014
12:00 AM
17610'
17610'
0'
Grade
RPM
Gallons/stroke
3.06
Depth in / out
-
Alkal
Gas Summary
Set At Size
-
0-
0-
907-685-1490 Unit Phone:
0
Josiah Failing Report By:
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
TOOH
Simonson / Sherman
10778' 70
120.0
Size
Type
15
5.0
Logging Engineers: J. Failing / A. Bongard
(max) (current)
Cly
t/ 7280' MD. Continue TOOH.
.
.
*
24 hr Recap:
Logging Engineers:M. Sherry / A. Bongard
(max)(current)
Cly
Continue RIH t/ 10292'; fill pipe every 1000' per BOT rep. Continue RIH t/ 10856'; tag top of packer; POOH to 10674'.
Size
Type
15
5.0
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
RIH w/ liner
Simonson / Sherman
8777'
907-685-1490Unit Phone:
0
Michael SherryReport By:
11
0-
650
Depth in / out
-
Alkal
Gas Summary
Set AtSize
17610'
0'
Grade
RPM
Gallons/stroke
3.06
70
120.0
2.35
Minimum
Depth
Maximum
C-4i C-4n
in
0
(current)
Units*
11
PU; LD; MU tools/BHA as per GBR. RIH w/ liner to 7378'. PU liner hanger. Prep floor and RIH w/ 5" DP to 7802'. Fill pipe.
4 5
Daily total mud losses: 8 bbls
0 06
=10,000 Units
9
0
Lime
TuffGvl
C-5n
0
ml/30min
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
(lb/bbl)
8-May-2014
12:00 AM
17610'
Flow In (gpm)
Flow In (spm)
Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Current Pump & Flow Data:
Report For:
96%
-
Avg
to-
Current
--
MWD Summary
Ss Cht Silt
0.902
1
Lst
MDSi616-BPX
40 #
10778'
Casing
Summary
Lithology (%)
L-80
Coal
9 5/8"
48
7214'
8.75 0.746
Footage
341'
14
10437' 6.70
Hours
(lb/100ft2)
Siltst
Weight
Clyst
15
C-3
Cement
C-1 C-5i
Sh
69
4
00 0
C-2
Chromatograph (ppm)
9
Average
-2 Trip
77
-Connection
0
Background
Trip gas: There has not been enough mud circulated to receive trip gas.
0
TFA Condition
0-0-NO-A-X-I-NO-TD
8.80
2 8.75 10778'
Bit #Bit Type
59.80
4.23
BOW @ 10413'Hydril 563
17610'
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
%Mud Type
FazePro OBM N/A
Ratio
Mud Data
Depth
73-27
MudcP
17610'10.0
--
Cor Solids
Min
YP
MaxECD
(ppg)
Tools
-
API FLPV
-
Avg
Oil / Water
Max @ ft
-
Morning Report Report # 20
Customer:
Well:
Area:
Location:
@
Rig:
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
-
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
-
TOOH w/ 5" DP t/ 3671'. Cut 6 wraps of drilling line. Rig service. TOOH t/ surface. Clean rig/platform. Completion:
(max)100% Gas In Air
.
.
*
24 hr Recap:
341'
Condition
Logging Engineers:M. Sherry / A. Bongard
(max)(current)
Cly
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
TOOH/LD with 5" DP
Simonson / Sherman
17525'
907-685-1490Unit Phone:
-
Michael SherryReport By:
384
0-
-
Flow In (gpm)
Depth in / out
-
Alkal
Gas Summary
Set AtSize
RPM
Gallons/stroke
-
70
120.0
-
15
5.0
Minimum
Depth
Maximum
Ss Cht Silt
C-4i C-4n
in
0
(current)
Units*
--
Packer set at 10186’. Displace to water-based from 10151’ to surface with 707 bbl 8.8 ppg. Displace to completion fluid. Service
16
Trip gas: 384 units of trip gas observed.
Daily total mud losses: 15 bbl of oil-based mud lost downhole.
-Average
rig. Lay down drill pipe from 10151’ to 6837’. Trip in hole with last 8 stands from derrick from 6837’ to 7571’. Continue to lay down
--
=10,000 Units
-
0
Lime
TuffGvl
C-5n
0
ml/30min
Grade
(lb/bbl)
9-May-2014
12:00 AM
17610'
%
17610'
0'
96%4.23
Max
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Current Pump & Flow Data:
Report For:
Avg
to-
Current
--
MWD Summary Depth
1
Lst
MDSi616-BPX
40 #
10778'
Casing
Summary
Lithology (%)
L-80
Coal
9 5/8"
-
7214'
8.75 0.746
Footage
10437' 6.70
Hours
(lb/100ft2)
-
TFA
-
Flow In (spm)
Size
Siltst
Weight
Clyst
Type
C-3
Cement
C-1 C-5i
Sh
--
00
-
0
C-2
Chromatograph (ppm)
-
3840Trip
-
drill pipe.
-Connection
-
Background
0
2 8.75 10778'
Bit #Bit Type
59.800.902
BOW @ 10413'Hydril 563
17610'
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
0-0-NO-A-X-I-NO-TD
Mud Type
KCl Brine -
Ratio
Mud Data
Depth
-
YP
8.80 -
MudcP
17610'-
--
Cor Solids
MinECD
(ppg)
Tools
-
API FLPV
-
Avg
Oil / Water
Max @ ft
-
Morning Report Report # 21
Customer:
Well:
Area:
Location:
@
Rig:
Date:
Time:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
-
ROP
ROP (ft/hr)
24 hr Max
Density (ppg)
-
Trip out of hole from 10674’ to 10393’. Trip in hole from 10393’ to 17610’; pick up 5’. Circulate and condition.
(max)100% Gas In Air
.
.
*
24 hr Recap:
(max)100% Gas In Air
Lay down drill pipe from 900’ to 39’. Lay down BHA, change elevators, clean rig floor. Trip in hole with 4.5” drill
Density (ppg)
-
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)-
Morning Report Report # 22
Customer:
Well:
Area:
Location:
@
Rig:
Date:
-
API FLPV
-
Avg
Oil / Water
17610'-
--
Cor Solids
MinECD
(ppg)
Tools
Mud Type
KCl Brine -
Ratio
Mud Data
Depth
-
YP
8.80 -
BOW @ 10413'Hydril 563
17610'
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
0-0-NO-A-X-I-NO-TD28.75 10778'
Bit #Bit Type
59.800.902
0
-Connection
-
Background 0 Trip
-
-
0
C-2
Chromatograph (ppm)
-
00
-
C-3
Cement
C-1 C-5i
Sh
--
Siltst
Weight
Clyst
Type
6.70
Hours
(lb/100ft2)
-
TFA
-
Flow In (spm)
Size
cP
Coal
9 5/8"
-
7214'
8.75 0.746
Footage
10437' 1
Lst
MDSi616-BPX
40 #
10778'
Casing
Summary
Lithology (%)
L-80
Avg
to-
Current
--
MWD Summary Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Current Pump & Flow Data:
Report For:
Max @ ft
Time:
24 hr Max
Max
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)-
10-May-2014
12:00 AM
17610'
%
17610'
0'
96%4.23
0
Lime
TuffGvl
C-5n
0
ml/30min
Grade
--
=10,000 Units
--Average
shoe. Install/remove wear bushing. Pick up 3rd party tools. Service rig. Continue to pick up tools. Rig up wireline.
-
pipe from surface to 7230’. Circulate and condition pumping citric pill. Lay down drill pipe from 7230’ to surface. Lay down mule
0
Max gas: 2 units of gas observed.
Daily total mud losses: 0 bbl lost downhole.
C-4i C-4n
in
0
(current)
Units*
-
Minimum
Depth
Maximum
Ss Cht Silt
RPM
Gallons/stroke
-
70
120.0
-
15
5.0
(lb/bbl)Mud
Flow In (gpm)
Depth in / out
-
Alkal
Gas Summary
Set AtSize
2
0-
--
907-685-1490Unit Phone:
-
Michael SherryReport By:
Cly
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
TOOH/LD with 5" DP
Simonson / Sherman
341'
Condition
Logging Engineers:M. Sherry / A. Bongard
(max)(current)
.
.
*
24 hr Recap:
341'
Condition
Logging Engineers:M. Sherry / A. Bongard
(max)(current)
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
RIH with 4.5" tubing
Simonson / Sherman
-
907-685-1490Unit Phone:
-
Michael SherryReport By:
-
0-
-
Flow In (gpm)
Depth in / out
-
Alkal
Gas Summary
Set AtSize
Gallons/stroke
-
70
120.0
-
15
5.0
(lb/bbl)Mud
Minimum
Depth
Maximum
Ss Cht Silt
C-4i C-4n
in
-
(current)
Units*
--
tools/BHA from surface to 204’. BCL hands splice ½ mile. Change out sheave. Start running in hole; make up cap TOOB clamp
-
Max gas: There was no significant gas observed.
Daily total mud losses: There were 0 barrels lost downhole.
-Average
splice. Continue to pick up 4.5” tubing from 204’ to 846’ per tally; clamp every collar.
--
=10,000 Units
-
0
ml/30min
Grade
RPM
%
17610'
0'
96%4.23
Lime
TuffGvl
Max
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)-
11-May-2014
12:00 AM
17610'Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Current Pump & Flow Data:
Report For:
Max @ ft
Time:
24 hr MaxAvg
to-
Current
--
MWD Summary Depth
1
Lst
MDSi616-BPX
40 #
10778'
Casing
Summary
Lithology (%)
L-809 5/8"
-
7214'
8.75 0.746
Footage
10437'
Cly
6.70
Hours
(lb/100ft2)
-
TFA
-
Flow In (spm)
Size
cP
Weight
Clyst
Type
Coal Cement
C-1 C-5i
Sh
--
Siltst
00
-
C-2
Chromatograph (ppm)
-
C-3 C-5n
-
-Trip
-
0 00
-Connection
2 8.75 10778'
Bit #Bit Type
59.800.902
BOW @ 10413'Hydril 563
17610'
WOB
1-1-WT-A-E-I-NO-BHA
Comments
TOW @ 10396'
Smith Milled Tooth XR+
0-0-NO-A-X-I-NO-TD
Mud Type
KCl Brine -
Ratio
Mud Data
Depth
-
YP
8.80 -17610'-
--
Cor Solids
MinECD
(ppg)
Tools
-
API FLPV
-
Avg
Oil / Water
-
Morning Report Report # 23
Customer:
Well:
Area:
Location:
@
Rig:
Date:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Density (ppg)
-
Background -
(max)100% Gas In Air
Set pump/pack-off. PSI test. Rig down test equipment and slickline. Completion: pick up, lay down, make up
.
.
*
24 hr Recap:
Completion: pick up, lay down, make up tools/BHA; cable to cable splice. Trip tubing/drill pipe. Continue to pick up
Background -
(max)
ROP
ROP (ft/hr)
Density (ppg)
-
Rig:
Date:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
-
Avg
Oil / Water
-
Morning Report Report # 24
Customer:
Well:
Area:
Location:
--
Cor Solids
MinECD
(ppg)
Tools
-
API FL Mud Data
Depth
-
YP
8.80 -17610'
PV
TOW @ 10396'
Smith Milled Tooth XR+
0-0-NO-A-X-I-NO-TD
Mud Type
KCl Brine -
Ratio
-
Connection
2 8.75 10778'
Bit #Bit Type
59.800.902
Hydril 563
17610'
00
-
-
0
Trip
C-5n
-
-
-
C-2
Chromatograph (ppm)
---
Siltst
00
C-3
Type
Coal Cement
C-1 C-5i
Sh
(lb/100ft2)
-
TFA
-
Flow In (spm)
Size
cP
WOB
0.746
Footage
10437'
Cly
6.70
Hours
Weight
Clyst
1
Lst
MDSi616-BPX
40 #
10778'
Casing
Summary
Lithology (%)
L-80
Avg
to-
Current
--
MWD Summary Depth
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Current Pump & Flow Data:
Report For:
Max @ ft
Time:
24 hr Max
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)-
12-May-2014
12:00 AM
17610'
@
17610'
0'
96%4.23
Lime
Max
BOW @ 10413'
1-1-WT-A-E-I-NO-BHA
Comments
ml/30min
Grade
RPM
%
TuffGvl
--
=10,000 Units
-
100% Gas In Air
-Average
Make cable change splice. Trip in hole to 8191’. Make gator splice on ESP; test same. Continue in hole to 8669’.
-
4.5” tubing from 846’ to 5020’; clamp every collar; test every 1000’. Continue tripping from 5020’ to 7902’. Change out spools.
-
Max gas: There was no significant gas observed.
Daily total mud losses: There were 0 barrels lost downhole.
-
(current)
Units*
-
0
Silt
C-4i C-4n
in
9 5/8"
-
7214'
8.75
(lb/bbl)Mud
Minimum
Depth
Maximum
Ss Cht
-
70
120.0
-
15
5.0
Flow In (gpm)
Depth in / out
-
Alkal
Gas Summary
Set AtSize
907-685-1490Unit Phone:
-
Michael SherryReport By:
-
0
RIH with 4.5" tubing
Simonson / Sherman
-
-
-
Logging Engineers:M. Sherry / A. Bongard
(max)(current)
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
341'
Condition
Gallons/stroke
.
.
*
24 hr Recap:
341'
Condition
Gallons/stroke
M. Sherry / A. Bongard
(max)(current)
OP16-03L1
Nikaitchuq Field
Oliktok Point
Nabors 245E
Preparing to move rig
Simonson / Sherman
-
-
-
Unit Phone:
-
Michael SherryReport By:
-
0
Logging Engineers:
Flow In (gpm)
Depth in / out
-
Alkal
Gas Summary
Set AtSize
-
70
120.0
-
15
5.0
(lb/bbl)Mud
Minimum
Depth
Maximum
Ss Cht
C-4i C-4n
in
9 5/8"
-
7214'
8.75
-
(current)
Units*
-
0
-
Pick up and assemble hanger assembly. Install penetrator. Make up lower connector splice and test as per Baker. Orient and land
-
to OP05-06.
Max gas: There was no significant gas observed.
-Average
hanger at 9132’. Run downhole pumps and test upper and lower seals; test good. Lay down landing joint. Clean rig floor. Nipple
--
=10,000 Units
-
100% Gas In Air
ml/30min
Grade
RPM
%
TuffGvl
17610'
0'
96%4.23
Lime
Max
BOW @ 10413'
1-1-WT-A-E-I-NO-BHA
Comments
Yesterday's Depth:
Current Depth:
24 Hour Progress:
-
SPP (psi)-
13-May-2014
12:00 AM
17610'
@
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Current Pump & Flow Data:
Report For:
Max @ ft
Time:
24 hr MaxAvg
to-
Current
--
MWD Summary Depth
1
Lst
MDSi616-BPX
40 #
10778'
Casing
Summary
Lithology (%)
L-80
0.746
Footage
10437'
Cly
6.70
Hours
Weight
Clyst
-
TFA
-
Flow In (spm)
Size
cP
WOB
Type
Coal Cement
C-1 C-5i
Sh
--
Siltst
00
C-3
Silt
-
C-2
Chromatograph (ppm)
-
C-5n
-
-Trip
0
down BOPs, clean up cellar. Nipple up riser and spacer spools, void riser of fluid, nipple down and pull to rig floor. Prepare
-
-
2 8.75 10778'
Bit #Bit Type
59.800.902
TOW @ 10396'
Smith Milled Tooth XR+
0-0-NO-A-X-I-NO-TD
Mud Type
KCl Brine -
Ratio
-
Hydril 563
17610'
Mud Data
Depth
-
YP
8.80 -17610'
PV
(lb/100ft2)
--
Cor Solids
MinECD
(ppg)
Tools
-
API FL
-
Avg
Oil / Water
-
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
Date:
Eni Petroleum AK-AM-0901288163
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Density (ppg)
-
00
Background -
(max)
Connection
Completion: continue to run in hole with 4.5” tubing from 8669’ to 9091’. Rig down Volant tool. Change elevators.
Daily total mud losses: There were 0 barrels lost downhole.
wellhead to accept tree; no visible leaks. Test tree. Mobilization: secure floor, cellar and wellbay. Continue to prepare to move rig
907-685-1490
WELL INFORMATION Created On : Jun 03 2014
Customer :ENI U.S. Operating
Well Name :OP16-03L1
Job Number :AK-XX-0901288163
Rig Name :Nabors 245E
Field Name :Nikaitchuq
Country :USA
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
10392.51 85.18 313.21 3419.34 2,140.74 N 8,303.59 W
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
10396.00 86.14 313.40 3,419.59 2,143.13 N 8,306.12 W 8042.64 28.04
10413.00 86.88 312.47 3,420.64 2,154.68 N 8,318.55 W 8059.44 6.98
10492.19 90.14 314.70 3,422.70 2,209.25 N 8,375.88 W 8137.66 4.99
10588.23 88.82 319.30 3,423.57 2,279.47 N 8,441.35 W 8231.51 4.98
10684.04 88.02 324.05 3,426.21 2,354.58 N 8,500.73 W 8323.14 5.03
10780.20 89.58 328.60 3,428.23 2,434.56 N 8,554.02 W 8412.56 5.00
10875.56 90.97 333.10 3,427.77 2,517.82 N 8,600.45 W 8498.22 4.94
10971.38 90.47 337.57 3,426.57 2,604.87 N 8,640.43 W 8580.74 4.69
11067.35 89.08 335.54 3,426.94 2,692.91 N 8,678.61 W 8662.36 2.56
11162.58 87.69 332.46 3,429.63 2,778.46 N 8,720.33 W 8745.46 3.55
11257.75 88.21 330.92 3,433.03 2,862.19 N 8,765.43 W 8830.29 1.71
11353.58 90.25 328.93 3,434.32 2,945.10 N 8,813.45 W 8917.05 2.97
11449.48 90.22 327.59 3,433.93 3,026.65 N 8,863.90 W 9005.04 1.40
11545.55 90.03 324.13 3,433.72 3,106.16 N 8,917.80 W 9094.69 3.61
11640.99 90.66 320.88 3,433.14 3,181.87 N 8,975.89 W 9185.60 3.47
11736.78 90.59 318.35 3,432.10 3,254.82 N 9,037.94 W 9278.20 2.64
11832.55 88.81 316.93 3,432.60 3,325.58 N 9,102.47 W 9371.58 2.38
11928.26 89.12 312.99 3,434.33 3,393.19 N 9,170.17 W 9465.76 4.13
12024.08 89.70 310.21 3,435.32 3,456.79 N 9,241.81 W 9560.90 2.96
12119.77 90.34 310.75 3,435.28 3,518.91 N 9,314.60 W 9656.12 0.88
12215.67 88.18 313.34 3,436.52 3,583.12 N 9,385.80 W 9751.24 3.52
12311.48 88.11 313.37 3,439.62 3,648.86 N 9,455.43 W 9845.94 0.08
12407.31 87.76 314.60 3,443.08 3,715.37 N 9,524.33 W 9940.48 1.33
12503.18 88.58 316.61 3,446.14 3,783.83 N 9,591.36 W 10034.60 2.26
12598.92 89.75 316.61 3,447.53 3,853.40 N 9,657.13 W 10128.31 1.22
12694.68 88.35 313.81 3,449.12 3,921.34 N 9,724.57 W 10222.47 3.27
12790.82 90.18 311.17 3,450.35 3,986.27 N 9,795.45 W 10317.73 3.34
12887.15 89.46 309.97 3,450.66 4,048.92 N 9,868.62 W 10413.58 1.45
12981.37 88.09 308.11 3,452.67 4,108.24 N 9,941.78 W 10507.51 2.45
13077.15 89.97 305.74 3,454.29 4,165.77 N 10,018.33 W 10603.20 3.16
13172.95 89.88 303.46 3,454.42 4,220.17 N 10,097.18 W 10699.00 2.38
INSITE V8.0.20 Page 1Job No:AK-XX-0901288163 Well Name:OP16-03L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
13268.76 89.68 301.28 3,454.79 4,271.46 N 10,178.10 W 10794.71 2.28
13364.64 90.50 299.83 3,454.64 4,320.20 N 10,260.66 W 10890.32 1.74
13460.24 91.18 298.05 3,453.23 4,366.45 N 10,344.31 W 10985.41 1.99
13556.29 90.76 296.97 3,451.61 4,410.81 N 10,429.49 W 11080.66 1.21
13651.85 90.50 291.26 3,450.56 4,449.83 N 10,516.66 W 11174.51 5.98
13747.66 91.68 287.90 3,448.73 4,481.93 N 10,606.90 W 11266.92 3.72
13843.46 92.57 287.86 3,445.18 4,511.32 N 10,698.01 W 11358.50 0.93
13939.26 92.94 286.82 3,440.58 4,539.84 N 10,789.35 W 11449.77 1.15
14034.94 92.92 287.98 3,435.69 4,568.42 N 10,880.53 W 11540.94 1.21
14130.58 91.97 287.92 3,431.61 4,597.86 N 10,971.43 W 11632.38 1.00
14226.51 92.02 285.18 3,428.27 4,625.17 N 11,063.32 W 11723.41 2.86
14322.26 93.37 289.25 3,423.76 4,653.47 N 11,154.66 W 11814.55 4.47
14418.16 91.91 290.76 3,419.34 4,686.24 N 11,244.68 W 11907.16 2.19
14514.04 91.67 293.42 3,416.35 4,722.28 N 11,333.47 W 12000.63 2.78
14609.95 91.55 295.37 3,413.65 4,761.87 N 11,420.77 W 12094.92 2.04
14705.61 89.09 295.46 3,413.12 4,802.92 N 11,507.17 W 12189.28 2.57
14801.44 88.76 295.27 3,414.92 4,843.97 N 11,593.75 W 12283.79 0.40
14896.92 89.69 294.60 3,416.21 4,884.22 N 11,680.32 W 12377.84 1.20
14993.71 86.69 293.47 3,419.27 4,923.61 N 11,768.66 W 12472.87 3.31
15088.59 87.47 291.00 3,424.10 4,959.47 N 11,856.36 W 12565.34 2.73
15184.35 88.51 292.28 3,427.46 4,994.76 N 11,945.31 W 12658.51 1.72
15280.03 87.39 291.89 3,430.88 5,030.71 N 12,033.92 W 12751.78 1.24
15376.08 91.79 291.29 3,431.57 5,066.04 N 12,123.20 W 12845.25 4.62
15471.86 95.40 291.57 3,425.56 5,100.96 N 12,212.17 W 12938.23 3.78
15567.82 94.44 291.88 3,417.33 5,136.35 N 12,300.98 W 13031.35 1.05
15664.06 94.07 291.37 3,410.19 5,171.72 N 12,390.20 W 13124.79 0.65
15759.24 92.76 290.95 3,404.52 5,206.01 N 12,478.81 W 13217.11 1.45
15855.11 91.47 289.95 3,400.99 5,239.49 N 12,568.57 W 13309.92 1.70
15950.72 90.29 289.17 3,399.52 5,271.49 N 12,658.65 W 13402.14 1.48
16046.48 88.51 288.15 3,400.52 5,302.13 N 12,749.37 W 13494.11 2.14
16142.19 87.72 288.08 3,403.67 5,331.87 N 12,840.28 W 13585.73 0.83
16238.19 91.54 288.48 3,404.29 5,361.97 N 12,931.42 W 13677.74 4.00
16334.27 88.58 290.27 3,404.19 5,393.84 N 13,022.04 W 13770.33 3.60
16430.04 91.72 290.58 3,403.94 5,427.26 N 13,111.78 W 13863.08 3.29
16527.06 91.85 293.60 3,400.91 5,463.72 N 13,201.63 W 13957.66 3.11
16621.66 90.57 296.68 3,398.92 5,503.90 N 13,287.23 W 14050.88 3.53
16717.45 91.91 298.03 3,396.84 5,547.90 N 13,372.29 W 14145.83 1.99
16813.10 91.62 301.69 3,393.90 5,595.49 N 13,455.19 W 14241.06 3.84
16908.65 88.39 304.43 3,393.89 5,647.61 N 13,535.25 W 14336.55 4.43
17004.80 85.37 307.07 3,399.12 5,703.68 N 13,613.15 W 14432.52 4.17
17100.57 87.45 307.11 3,405.12 5,761.32 N 13,689.39 W 14528.03 2.17
17196.14 89.03 308.20 3,408.05 5,819.68 N 13,765.02 W 14623.43 2.01
17291.84 92.53 310.34 3,406.75 5,880.23 N 13,839.08 W 14718.81 4.29
17387.12 93.10 313.63 3,402.07 5,943.88 N 13,909.81 W 14813.22 3.50
17483.08 95.52 316.73 3,394.86 6,011.74 N 13,977.25 W 14907.33 4.09
INSITE V8.0.20 Page 2Job No:AK-XX-0901288163 Well Name:OP16-03L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
17544.46 95.13 318.94 3,389.16 6,057.04 N 14,018.27 W 14966.87 3.64
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 304.82 degrees (True)
- A total correction of 19.36 deg from Magnetic north to True north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 17,544.46 feet is 15,270.88 feet along 293.37 degrees (True)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.20 Page 3Job No:AK-XX-0901288163 Well Name:OP16-03L1 Survey Report