Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-031 Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Nabors 245 Date: May 19, 2014 Surface Data Logging End of Well Report OP16-03L1 OP16-03L1 PB1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Mud Record 7. Bit Record 8. Morning Reports 9. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: Eni Petroleum Rig: Nabors 245 Well: OP16-03L1 & OP16-03L1 PB1 Field: Nikaitchuq Field Borough: North Slope Borough State: Alaska Country: United States API Number: 50-029-23442-60-00 (OP16-03L1) 50-029-23442-70-00 (OP16-03L1 PB1) Sperry Job Number: AK-AM-0901288163 Job Start Date: 19 April 2014 Spud Date: 26 April 2014 Total Depth: 17610’ MD, 3383’ TVD North Reference: True Declination: 19.364° Dip Angle: 81.025° Total Field Strength: 57622.153 nT Date Of Magnetic Data: 30 April 2014 Wellhead Coordinates N: North 70° 30’ 39.39” Wellhead Coordinates W: West 149° 51’ 50.00“ Drill Floor Elevation 53.86’ Ground Elevation: 12.2’ Permanent Datum: Mean Sea Level SDL Engineers: Josiah Failing, Andy Bongard, Mike Sherry Company Geologist: Sorin Cornea, Brent Boyd, Ed Van de Brand, Anne Laroque Company Representatives: Ben Perry, Craig Ruminer, Bruce Simonson, Dean Sherman SSDS Unit Number: 121 DAILY SUMMARY 04/19/2014 SDL continues on location from previous well. Move rig and place mats/herculite. Rig up well head to pump down IA and pressure up. Fill pits with 9 ppg brine. Test lines. Set BPV. Nipple down the tree. Gas: No significant gas data. Fluids: There were 596 barrels of Brine lost down hole. 04/20/2014 Nipple down the wellhead. Nipple up BOPs. Continue to nipple down the tree. Make up the riser. Test BOPs. Start pulling 4.5" tubing. Gas: No significant gas data. Fluids: There were 0 barrels of Brine lost down hole. 04/21/2014 Pull tubing from 9159' MD to 1500' MD while filling backside with 9 ppg brine. Rig up wireline and pull pump assembly. Rig down wireline. Gas: No significant gas data. Fluids: There were 441 barrels of Brine lost down hole. 04/22/2014 Continue to pull tubing. Lay down tools and motor. Prepare rig for scraper run. Load pipe shed with drill pipe. Slip and cut drilling lines. Perform maintenance on the top drive. Make up the BHA for a scraper run. Gas: No significant gas data. Fluids: There were 240 barrels of Brine lost down hole. 04/23/2014 Trip in hole with scraper assembly from 2617' to 10852' MD. Trip out of hole to 10063' MD. Experience top drive mechanical problems. Troubleshoot and repair top drive problems. Pump 10bbls 8.8 ppg KCL brine down backside roughly every hour. Gas: No significant gas data. Fluids: There were 244 barrels of Brine lost down hole. 04/24/2014 Continue and finish repairing top drive. Trip out of hole to surface. Lay down the BHA. Pick up the isolation packer assembly. Pump 10 bbls. KCL brine down backside roughly every hour. Trip in hole and tag bottom at 10905' MD. Fill the well down the backside. Set the packer at 10905'. Test packer to 1000, 2000, and 3000 psi. Gas: No significant gas data. Fluids: There were 361 barrels of Brine lost down hole. 04/25/2014 Fill the annulus and pressure test isolation packer. Release from packer. Displace to clean production brine. Trip out of hole to surface. Lay down the packer BHA. Rig up USIT wireline loggers. Run in hole to 10856' MD on wireline. Pull out of hole with wireline and rig down same. Clean pits. Bring OBM into pits and condition. Gas: No significant gas data. Fluids: There were 0 barrels of Brine lost down hole. 04/26/2014 Pick up milling tools and whipstock BHA. Trip in hole to 10394' MD. Set whipstock and sheer BHA from whipstock. Displace from KCL brine to FazePro OBM. Begin milling window at 10396'. Gas: The max drilling gas was 6 U. The average drilling gas was 4 U. The max trip gas was 2173 U. Fluids: There were 6 barrels of oil-based mud lost down hole. 04/27/2014 Continue milling window from 10399' to 10437' MD. Circulate and condition mud, pump fiber sweep. Perform formation integrity test. Pump dry job and trip out of hole to surface. Lay down milling BHA and pick up mud motor BHA. Trip in hole to 1500' MD. Shallow hole test. Continue Trip in hole. Gas: The max drilling gas was 12 U. The average drilling gas was 8 U. The max trip gas was 2 U. Fluids: There were 8 barrels of oil-based mud lost down hole. 04/28/2014 Continue tripping in hole to 10437’ MD. Drill ahead, sliding and rotating to 10778’ MD. Back ream out of hole to 10513’ MD. Pull through window from 10413’ to 10394’ MD. Continue back reaming out of hole to 10204’ MD. Continue tripping out of hole, pumping 40 GPM at 3 minutes per stand to 7000’ MD. Pump dry job. Trip out of hole on elevators. Gas: The max drilling gas was 63 U. The average drilling gas was 19 U. The max trip gas was 7 U. Fluids: There were 58 barrels of oil-based mud lost over the shakers. Zero losses downhole. 04/29/2014 Continue to trip out of hole to surface. Lay down BHA # 4. Pick up BOP testing tools and test BOPs. Cut and slip drill line. Pick up drill pipe from shed and makeup BHA #5 with Xceed. Trip in hole to 1500' MD. Shallow hole test. Continue to trip in hole, filling pipe every 2500'. Gas: No significant gas data. Fluids: There were 2 barrels of oil-based mud lost downhole. 04/30/2014 Continue to trip in hole with 4.5" drill pipe to 7498' MD. Continue to trip in hole with 5" drill pipe to 10430' MD. Perform open-hole logging from 10430’ to 10778' MD. Rotary drilling ahead from 10778' to 11422' MD. Gas: The max drilling gas was 866 U. The average drilling gas was 254 U. The current background gas is 46 U. The max trip gas was 31 U Fluids: There were 58 barrels of oil-based mud lost downhole. 05/01/2014 Rotary drilling ahead from 11422’ to 13242’ MD. Gas: The max drilling gas was 958 U. The average drilling gas was 555 U. The current background gas is 83 U. Fluids: There were 153 barrels of oil-based mud lost downhole. 05/02/2014 Rotary drilling ahead from 13242’ to 15445’ MD. Gas: The max drilling gas was 722 U. The average drilling gas was 336 U. The current background gas is 55 U. Fluids: There were 79 barrels of oil-based mud lost downhole. 05/03/2014 Rotary drill ahead from 15445' to 16882' MD. Back ream to 16499' MD. Prepare to sidetrack well. Gas: The max drilling gas was 740 U. The average drilling gas was 374 U. The current background gas is 56 U. Fluids: There were 80 barrels of oil-based mud lost downhole. 05/04/2014 Sidetrack from OP16-03L1 PB1 at 16499' MD. Rotary drill ahead from 16499' to 17552' MD. Gas: The max drilling gas was 673 U. The average drilling gas was 180 U. The current background gas is 71 U. Fluids: There were 62 barrels of oil-based mud lost downhole. 05/05/2014 Rotary drill ahead from 17552' to production TD at 17610' MD, 3383' TVD. Begin to back-ream out of hole. Back-ream out of hole to 10274' MD. Gas: The max drilling gas was 118 U. The average drilling gas was 83 U. The current background gas is 71 U. Fluids: There were 135 barrels of oil-based mud lost downhole. 05/06/2014 Continue to back-ream out of the hole to 7498' MD. Service rig and top drive. Pump dry job, and then trip out of hole on elevators to surface. Lay down BHA #5. Pickup whipstock retrieval BHA. Trip in hole with 4.5 drill pipe to 8080' MD. Continue TIH for whipstock retrieval. Gas: The max trip gas was 22 U. Fluids: There were 6 barrels of oil-based mud lost downhole. 05/07/2014 Continue to trip in the hole to 10406' MD. Orientate toolface and latch onto the whipstock- Retrieval successful. Pump dry job. Trip out of hole to surface. Lay down whipstock retrieval BHA. Trip in hole to 10856' MD. Circulate and spot 37 bbl brine pill at 10853' MD. Pump dry job. Trip out of hole to 7280' MD. Continue to trip out of hole. Gas: The max trip gas was 282 U. Fluids: There were 28 barrels of oil-based mud lost downhole. 05/08/2014 Trip out of hole with 5” drill pipe to 3671’. Cut 6 wraps of drilling line. Rig service. Trip out of hole to surface. Clean rig/platform. Completion: pick up; lay down; make up tools/BHA as per GBR. Run in hole with liner to 7378’. Pick up liner hanger. Prep floor and run in hole with 5” drill pipe to 7802’. Fill pipe. Continue to run in hole to 10292’; fill pipe every 1000’ per BOT rep. Continue to run in hole to 10856’. Tag top of packer. Pull out of hole to 10674’. Gas: The max was 11 units; trip gas was not received. Fluids: There were 8 barrels of oil-based mud lost downhole. 05/09/2014 Trip out of hole from 10674’ to 10393’. Trip in hole from 10393’ to 17610’; pick up 5’. Circulate and condition. Packer set at 10186’. Displace to water-based from 10151’ to surface with 707 bbl 8.8 ppg. Displace to completion fluid. Service rig. Lay down drill pipe from 10151’ to 6837’. Trip in hole with last 8 stands from derrick from 6837’ to 7571’. Continue to lay down drill pipe. Gas: Max of 384 units of trip gas observed. Fluids: There were 15 barrels of oil-based mud lost downhole. 05/10/2014 Lay down drill pipe from 900’ to 39’. Lay down BHA, change elevators, clean rig floor. Trip in hole with 4.5” drill pipe from surface to 7230’. Circulate and condition pumping citric pill. Lay down drill pipe from 7230’ to surface. Lay down mule shoe. Install/remove wear bushing. Pick up 3rd party tools. Service rig. Continue to pick up tools. Rig up wireline. Gas: Max of 2 units of gas observed. Fluids: There were 0 barrels lost downhole. 05/11/2014 Set pump/pack-off. PSI test. Rig down test equipment and slickline. Completion: pick up, lay down, make up tools/BHA from surface to 204’. BCL hands splice ½ mile. Change out sheave. Start running in hole; make up cap TOOB clamp splice. Continue to pick up 4.5” tubing from 204’ to 846’ per tally; clamp every collar. Gas: There was no significant gas observed. Fluids: There were 0 barrels lost downhole. 05/12/2014 Completion: pick up, lay down, make up tools/BHA; cable to cable splice. Trip tubing/drill pipe. Continue to pick up 4.5” tubing from 846’ to 5020’; clamp every collar; test every 1000’. Continue tripping from 5020’ to 7902’. Change out spools. Make cable change splice. Trip in hole to 8191’. Make gator splice on ESP; test same. Continue in hole to 8669’. Gas: There was no significant gas observed. Fluids: There were 0 barrels lost downhole. 05/13/2014 Completion: continue to run in hole with 4.5” tubing from 8669’ to 9091’. Rig down Volant tool. Change elevators. Pick up and assemble hanger assembly. Install penetrator. Make up lower connector splice and test as per Baker. Orient and land hanger at 9132’. Run downhole pumps and test upper and lower seals; test good. Lay down landing joint. Clean rig floor. Nipple down BOPs, clean up cellar. Nipple up riser and spacer spools, void riser of fluid, nipple down and pull to rig floor. Prepare wellhead to accept tree; no visible leaks. Test tree. Mobilization: secure floor, cellar and wellbay. Continue to prepare to move rig to OP05-06. Gas: There was no significant gas observed. Fluids: There were 0 barrels lost downhole. 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 19000 20000 0 5 10 15 20 25 30 Me a s u r e d D e p t h Rig Days Actual WELL NAME: OP16-03L1 & OP16-03L1 PB1 OPERATOR: Eni Petroleum MUD CO: MI Swaco RIG: Nabors 245 SPERRY JOB: AK-XX-0901288163 Days vs. Depth 19 April 2014 Sperry SDL remain on location from previous well LOCATION: Oliktok Point AREA: Nikaitchuq Field STATE: Alaska SPUD: 26-Apr-2014 TD: 5-May-2014 Landed 5.5" Liner 17610' MD, 3383' TVD 09 May 2014 Drill 8.75" Prod. Build Section to 10,778' MD, 3,430' TVD POOH to P/U 8.75" Production BHA Off Bot: 11:30 28 Apr 2014 Commence 8.75" Prod. Build Section On Bot: 23:00 26 Apr 2014 Mill WIndow through Casing (Spud) TOW: 10,396' MD, 3,419' TVD BOW: 10,413' MD, 3,420'TVD On Bot: 23:00 26 Apr 2014 Mill 8.75" hole to 10,437' MD, 3,422' TVD POOH to P/U 8.75" Build Section BHA Off Bot: 04:40 27 Apr 2014 Commence 8.75" Production Section On Bot: 15:30 30 Apr 2014 TD PB1 Production Hole Section 16882' MD, 3380' TVD Off Bot: 20:45 03 May 2013 TD Production Hole Section 17610' MD, 3383' TVD Off Bot: 00:40 05 May 2013 Open-hole Sidetrack Kick-off at 16499' MD, 3401' TVD Commence 8.75" Production Section On Bot: 02:05 04 May 2014 WELL NAME:LOCATION:Oliktok Point OPERATOR:AREA:Nikaitchuq Field SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 What went as, or better than, planned: We experienced about a 200' gap in THA gas data due to the genie filter being plugged up in the THC. The filter was changed at the beginning of the well, but with all the condensation that flows through the sample line, it's useful life is minimized. Recommendations: Innovations and/or cost savings: Communication with the remote computers worked as designed. Difficulties experienced: Change the genie filter after each run. Monitor the sample flow volume, and if the flows drop change the genie filter out during a connection. Other jobs experiencing moisture issues should install the new moisture eliminating dropout jar. N/A ENI Petroleum AK-XX-0901288163 Andew Bongard 7-May-2014 OP16-03L1 Surface Data Logging After Action Review WELL NAME:OP16-03L1 LOCATION:Oliktok Point OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO:MI Swaco STATE:Alaska RIG:Nabors 245 SPUD:26-Apr-2014 SPERRY JOB:AK-XX-0901288163 TD:5-May-2014 Marker MD INC AZ TVD TVDSS 8 3/4" OP16-03L1 Borehole TOW 10,396.0 85.2 310.0 3,419.6 -3,365.7 BOW 10,413.0 85.7 294.3 3,421.0 -3,367.1 OA-Sand Top 11,197.0 87.9 331.9 3,431.0 -3,377.1 OA-2 12,340.0 88.0 313.7 3,440.6 -3,386.7 OA-3 12,599.0 89.7 316.6 3,447.5 -3,393.7 OA-3 14,009.0 92.9 287.7 3,437.0 -3,383.1 OA-2 14,325.0 93.3 289.3 3,423.6 -3,369.7 Fault 1 14,843.0 89.2 295.0 3,415.7 -3,361.8 Fault 2 15,037.0 87.0 292.3 3,421.6 -3,367.8 OA-4 15,181.0 88.5 292.2 3,427.4 -3,373.5 OA-Sand Bottom 15,234.0 87.9 292.1 3,429.0 -3,375.1 OA-Sand Bottom 15,458.0 94.9 291.5 3,426.8 -3,372.9 OA-4 15,518.0 94.9 291.7 3,421.4 -3,367.5 Fault 3 16,787.0 91.7 300.7 3,394.6 -3,340.8 Fault 4 17,010.0 85.5 307.1 3,399.5 -3,345.7 OA-4 17,037.0 86.1 307.1 3,401.5 -3,347.7 OA-4 17,145.0 88.2 307.6 3,406.8 -3,352.9 Fault 5 17,327.0 92.7 311.6 3,405.1 -3,351.3 TD 8 3/4" Borehole 17,610.0 95.1 318.9 3,383.3 -3,329.4 8 3/4" OP16-03L1 PB1 Borehole Sidetrack Point 16,499.0 92.9 292.7 3,401.0 -3,347.1 OA-3 16,690.0 93.6 299.1 3,388.5 -3,334.6 Fault 3 16,780.0 92.4 301.0 3,383.7 -3,329.8 TD 8 3/4" PB1 16,881.0 91.9 301.6 3,380.2 -3,326.3 Formation Tops OP16-03L1 & OP16-03L1 PB1 Oliktok Point Eni Petroleum Nikaitchuq Field MI Swaco Alaska Nabors 245 26-Apr-2014 AK-XX-0901288163 5-May-2014 Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/R 6/R3 Cake Solids Oil/Water Sd Pm pH Chlor ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%mg/l 19-Apr 10880 9.00 27 -----------52000 Move rig, N/D tree, rig up 20-Apr 10880 9.00 27 -----------57500 N/U and test BOPs, pull tubing 21-Apr 10880 8.80 27 -----------48000 Pull tubing, perform wireline 22-Apr 10880 8.50 27 -----------48500 P/U drill pipe, prepare for scraper run 23-Apr 10880 8.80 28 -----------48500 Scraper run, troubleshoot top drive 24-Apr 10880 8.80 27 -----------48500 Run and test packer, displace to OBM 25-Apr 10880 8.80 27 -----------48000 Prepare to M/U BHA Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/R 6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab LGS/HGS Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb 26-Apr 10399 8.8 45 11 16 7/8/8 4.4 38/27/22/17/7/6 -8.22 70/30 2.4 3.12 595 -Milling Window 27-Apr 10437 8.8 46 9 16 7/7/8 -34/25/20/15/7/6 -8.7 70/30 2.4 3.12 563 -RIH w/ mud motor BHA 28-Apr 10778 8.8 49 13 22 8/8/9 5.0 48/35/30/18/8/7 1 7.72 71/29 2 2.6 688 -Production Build TD + BROOH 29-Apr 10778 8.8 49 12 18 7/8/8 5.4 42/30/26/21/8/7 1 7.76 71/29 2 2.6 630 -Test BOPs, TIH w/ BHA #5 30-Apr 11230 8.8 47 14 21 8/9/9 5.4 49/35/29/23/8/7 1 8.95 71/29 1.7 2.21 682 -Drill Ahead 1-May 13242 8.8 43 12 13 7/7/8 4.8 37/25/21/15/7/6 1 8.77 76/24 2 2.6 639 -Drill Ahead 2-May 15310 8.8 44 13 13 7/7/8 5.0 39/26/21/16/7/6 1 10 75/25 2.5 3.25 505 -Drill Ahead 3-May 16881 8.8 45 13 15 7/7/8 5.2 41/28/23/17/7/6 1 9.91 75/25 2.8 2.93 558 -Drill Ahead, Openhole Sidetrack 4-May 17193 8.85 46 13 15 7/8/8 5.2 41/28/23/17/7/6 1 9.74 66/34 2.9 3.77 510 -DrillAhead 5-May 17610 8.85 46 13 16 7/8/8 5.0 42/29/24/18/8/7 1 8.84 73/27 3 3.9 511 -BROOH 6-May 17610 8.85 48 15 14 7/7/8 5.2 44/26/24/19/8/7 1 10 73/27 2.5 3.25 508 -BROOH, TOOH, L/D BHA 7-May 17610 8.8 48 15 14 7/7/8 5.2 44/29/23/20/8/7 1 10 73/27 2.35 3.06 510 -TIH, Spot Brine Pill, TOOH 8-May 17610 8.8 48 15 14 7/7/8 5.2 44/29/23/20/8/7 1 10 73/27 2.35 3.06 510 -RIH with liner Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/R 6/R3 Cake Solids Oil/Water Sd Pm pH Chlor ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%mg/l 9-May 17610 8.80 -------------Set liner, TOOH, displace w/ brine 10-May 17610 8.80 -------------TIH w/ 4.5", TOOH & LD 4.5" 11-May 17610 8.80 ------------- 12-May 17610 8.80 ------------- Casing Record Remarks 9.625" Casing @ 10396' MD, 3419'TVD 5.5" Liner @ 17610' MD, 3383' TVD Remarks WELL NAME:LOCATION: OPERATOR:AREA: MUD CO:STATE: RIG:SPUD: SPERRY JOB:TD: W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 4 200 1 Mill 8.75 10396 10437 41 5.96 N/A 6.9 8.8 96 1346 429 -Mill Out Casing 5 300 2 Milled Tooth XR+8.75 10437 10779 342 6.70 0.746 51.0 15 70 1580 420 1-1-WT-A-E-I-NO-BHA 8.75" Production Build Section 6 500 3 MDSi616-BPX 8.75 10779 16881 6102 -0.902 ------TD PB1 Production Section 6 600 3 MDSi616-BPX 8.75 16499 17610 1111 59.80 0.902 120.6 2 120 2750 500 0-0-NO-A-X-I-NO-TD Open-hole Sidetrack BHA WELL NAME:OP16-03L1 & OP16-03L1 PB1 LOCATION:Oliktok Point OPERATOR:Eni Petroleum AREA:Nikaitchuq Field MUD CO: SPERRY JOB:AK-XX-0901288163 TD:5-May-2014 MI Swaco STATE:Alaska RIG:Nabors 245 SPUD:26-Apr-2014 B i t R e c o r d . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / M.Sherry 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: Test lines, set BPV. Nipple down tree. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Ruminer ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-xx Rig up PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No gas readings ConditionBit # 8.80 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 1 Customer: Well: Area: Location: Rig: OP16-03L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 19-Apr-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 44500.00 Move rig and place mats / herculite. Rig up on well head to pump down IA and pressure up. Fill pits with 9 ppg Brine. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Nipple down wellhead, nipple up BOPs. Continue nipple down tree, make up riser. Test BOPs. Start pull 4.5" tubing. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 44500.00 0 20-Apr-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 2 Customer: Well: Area: Location: Rig: OP16-03L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 9.00 Size No gas readings 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-xx POOH Tubing PV Footage Perry / Ruminer ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / M.Sherry Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / M.Sherry 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: assembly. Rig down wireline. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Ruminer ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901288163 POOH Tubing PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No gas readings ConditionBit # 9.00 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 3 Customer: Well: Area: Location: Rig: OP16-03L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 21-Apr-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 44500.00 Pull tubing from 9159' MD to 1500' MD while filling backside with 9 ppg brine. Rig up wireline and pull pump Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Continue pull tubing. Lay down tools and motor. Prepare rig for scraper run. Load pipe shed with drill pipe. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 44500.00 0 22-Apr-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 4 Customer: Well: Area: Location: Rig: OP16-03L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 9.00 Size No gas readings 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901288163 MU Scraper BHA PV Footage Perry / Ruminer ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: Slip and cut drilling lines. Maintenance on top drive. Make up BHA for scraper run. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / M.Sherry Set AtSize Grade (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size Grade 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / M. Sherry 0 0 - - Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 28 C-5n - - C-2 - in --Minimum Depth Time: and repair top drive problems. Pump 10bbls 8.8 ppg KCL brine down backside roughly every hour. - - - - Max @ ft Current -- Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Ruminer Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901288163 Repairing Top Drive PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 Brine Depth in / out Mud Type Lst Type Average --Background (max) Trip -- Avg Min Comments RPM ECD (ppg) ml/30min Tools - API FL Chromatograph (ppm) WOB 100% Gas In Air =10,000 Units -Connection 0 No Gas Readings Condition Bit # 8.80 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - Nabors 245E Report For: Morning Report Report # 5 Customer: Well: Area: Location: Rig: OP16-03L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 23-Apr-2014 12:00 AM Current Pump & Flow Data: - Max 0 Chlorides mg/l 48500.00 TIH w/ scraper assembly f/ 2617' t/ 10852' MD. TOOH t/ 10063' MD. Top drive mechanical problems. Troubleshoot Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Continue and finish repairing top drive. TOOH t/ surface. L/D BHA. P/U isolation packer assembly. Pump 10 bbls Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 48500.00 0 24-Apr-2014 12:00 AM Current Pump & Flow Data: - Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 6 Customer: Well: Area: Location: Rig: OP16-03L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - Nabors 245E Report For: Condition Bit # 8.80 Size No Gas Readings Test packer to 1000, 2000, and 3000 psi. 100% Gas In Air =10,000 Units -Connection 0 Tools - API FL Chromatograph (ppm) WOB -- Avg Min Comments RPM ECD (ppg) ml/30min -Background (max) Trip Average - Mud Type Lst Type KCL Brine Depth in / out YP (lb/100ft 2) 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901288163 Test Packer PV Footage Perry / Ruminer Sh Clyst Tuff Gvl Coal cP Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) - - - Max @ ft Current -- Date: Time: KCL brine down backside roughly every hour. TIH and tag bottom @ 10905' MD. Fill well down backside. Set packer @ 10905'. - in --Minimum Depth C-5n - - C-2 - SPP (psi) Gallons/stroke TFA Bit Type Depth 27 MBT 0' pH 0 0 0 Siltst - - Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / M. Sherry Set At Size Grade (max) (current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size Grade 907-685-1490 Unit Phone: 0 Josiah Failing Maximum Report By: Logging Engineers: J. Failing / A. Bongard 0 0 - - Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 27 C-5n - - C-2 - in --Minimum Depth Time: t/ surface. L/D packer BHA. R/U USIT wireline loggers. RIH t/ 10856' MD w/ wireline. POOH w/ wireline and R/D. Clean pits. - No other gas readings - 10905' - Max @ ft Current -- Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Perry / Ruminer Sh Clyst Tuff Gvl Coal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901288163 Pepare to M/U BHA PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 KCL Brine Depth in / out Mud Type Lst Type Average 8365 -Background (max) Trip -- Avg Min Comments RPM ECD (ppg) ml/30min Tools - API FL Chromatograph (ppm) WOB 100% Gas In Air =10,000 Units -Connection 0 Max gas during displacement to clean brine: 8365 (gas bubble) Bring OBM into pits and condition. Condition Bit # 8.80 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - Nabors 245E Report For: Morning Report Report # 7 Customer: Well: Area: Location: Rig: OP16-03L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 25-Apr-2014 12:00 AM Current Pump & Flow Data: - Max 0 Chlorides mg/l 48000.00 Fill annulus and pressure test isolation packer. Release from packer. Displace to clean production brine. TOOH Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Report By: 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly Depth in / out Bit Type RPM OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E Milling Window Simonson / Ruminer 907-685-1490 Unit Phone: 0 Josiah Failing Set At Size 40 # L-80 Grade 84 C-2 Gas Summary Eni Petroleum AK-AM-0901288163 26-Apr-2014 12:00 AM 10396' 10399' 3' 0 1 0 1 118 0 0 107 6 10398'Minimum Depth Maximum in 2 10396' 0 1 0 from KCL brine to FazePro OBM. Begin milling window @ 10396'. 4 Cumulative daily mud losses: 4 bbls 427 Alkal Coal Gallons/stroke 0 Lime Tuff Gvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: 101 SPP (psi) Max @ ft 10399' Date: Time: API FL Depth 0' Avg to 0' Current 2.2 1.4 (current) Units* Clyst Ss Cht Silt Casing Summary Lithology (%) - 11 45 Footage PV cP Weight Flow In (gpm) Flow In (spm) Oil / Water Hours 0 Cement C-1 C-5i Sh Siltst Chromatograph (ppm) 0 1 00 C-4i C-4n 0 Lst (lb/100ft 2) 8.80 Type 16 Mud (lb/bbl) ml/30min 3.12 2.40 C-3 Average 2173 Trip (max) 0 Comments 2Background 100% Gas In Air =10,000 Units -Connection Max gas while displacing to OBM: 2173 units Max gas while milling: 6 units Bit # 0 8.5 10396' Size TOW @ 10396'BOW @ 10413'Hydril 563 - WOB Window Mill TFA Condition MWD Summary 96% %Mud Type FazePro OBM N/A Ratio Mud Data Depth 70-30 4.23 @ Current Pump & Flow Data: Report For: 10394'8.2 - - Cor Solids - Avg Min YP Max ECD (ppg) Tools Job No.: Daily Charges: Total Charges: Rig Activity: 2.8 Morning Report Report # 8 Customer: Well: Area: Location: Rig: 1320 ROP ROP (ft/hr) 24 hr Max P/U milling tools and whipstock BHA. TIH t/ 10394' MD. Set whipstock and sheer BHA from whipstock. Displace Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity Continue milling window f/ 10399' t/ 10437' MD. Circulate and condition mud, pump fiber sweep. FIT test. Pump - ROP ROP (ft/hr) 24 hr Max Morning Report Report # 9 Customer: Well: Area: Location: Rig: Job No.: Daily Charges: Total Charges: Rig Activity: 30.8 Min YP Max ECD (ppg) Tools Telescope 675 @ Current Pump & Flow Data: Report For: 10394'8.7 - - Cor Solids 96% %Mud Type FazePro OBM N/A Ratio Mud Data Depth 70-30 4.23 BOW @ 10413'Hydril 563 - WOB Smith Milled Tooth XR+ TFA Condition 1 8.75 10437' 0 10396' Max gas during trip: 2 units Max gas while milling: 12 units 100% Gas In Air =10,000 Units -Connection Comments Background TOW @ 10396' Trip (max) 2Average 2 (lb/bbl) ml/30min 3.12 2.40 41' 8.80 Type 16 Window Mill Mud C-3 Bit # 0 Lst 00 C-4i C-4n Chromatograph (ppm) 4 3 0 Cement C-1 C-5i Sh Siltst cP Weight Flow In (gpm) Flow In (spm) Oil / Water Hours (lb/100ft 2) Casing Summary Lithology (%) 0.746 946 8.5 - Footage (current) Units* Clyst Ss Cht Silt Depth - Avg to 10437' Current 13.4 - MWD Summary Max @ ft 10437' Date: Time: API FL PV - Avg 0 Lime Tuff Gvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) - Alkal Coal Gallons/stroke dry job and TOOH t/ surface. L/D milling BHA and P/U mud motor BHA. TIH t/ 1500' MD. Shallow hole test. Continue TIH. 8 Daily mud losses: 8 bbls 10425' 0 2 0 10430'Minimum Depth Maximum in 2 0 650 0 1 0 2 1175 0 Eni Petroleum AK-AM-0901288163 27-Apr-2014 12:00 AM 10399' 10437' 38' 86 C-2 Gas Summary 12 907-685-1490 Unit Phone: 0 Josiah Failing Set At Size 40 # L-80 Grade OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E TIH Simonson / Ruminer Depth in / out Bit Type RPM 10437' Size Report By: 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly . . * 24 hr Recap: Report By: 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly Bit Type RPM 10437' Size OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E TOOH Simonson / Ruminer 907-685-1490 Unit Phone: 0 Josiah Failing Set At Size 40 # L-80 Grade C-2 Gas Summary 63 28-Apr-2014 12:00 AM 10437' 10778' 341' Depth in / out 1 7 0 4 7373 0106 0 2197 10455'Minimum Depth Maximum in 2 10664' 0 8 2 window f/ 10413' t/ 10394' MD. BROOH t. 10204' MD. TOOH, pumping @ 3 mins per stand 40 GPM t/ 7000'. Pump dry job. TOOH. 19 Daily mud losses: 58 bbls total - Alkal Coal Gallons/stroke 0 Lime Tuff Gvl C-5n Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Depth 10778' Avg to 10437' Current 61.7 - MWD Summary (current) Units* Clyst Ss Cht Silt Casing Summary Lithology (%) 0.746 13 49 341' 8.5 - Footage Siltst cP Weight Flow In (gpm) Flow In (spm) Oil / Water Hours (lb/100ft 2) 20 0 Cement C-1 C-5i Sh 02 C-4i C-4n Lst Chromatograph (ppm) 35 Type 22 Window Mill Mud C-3 Bit # 0 (lb/bbl) ml/30min 2.60 2.00 41' Average 7Trip (max) 7 Comments -Background TOW @ 10396' 100% Gas In Air =10,000 Units -Connection Max gas while BROOH: 7 units Max gas while drilling: 63 units 1 8.75 10437' 0 10396' BOW @ 10413'Hydril 563 10778' WOB Smith Milled Tooth XR+ TFA Condition 8.80 96% %Mud Type FazePro OBM N/A Ratio Mud Data Depth 71-29 4.23 @ Current Pump & Flow Data: Report For: 10778'7.7 - - Cor Solids Min YP Max ECD (ppg) Tools Telescope 675 API FL PV - Avg Job No.: Daily Charges: Total Charges: Rig Activity: 213.7 Max @ ft 10712' Morning Report Report # 10 Customer: Well: Area: Location: Rig: Date: Time: Eni Petroleum AK-AM-0901288163 - ROP ROP (ft/hr) 24 hr Max Continue TIH t/ 10437' MD. Drill ahead, sliding and rotating t/ 10778' MD. BROOH t/ 10513' MD. Pull through Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Continue TOOH t/ surface. L/D BHA # 4. P/U BOP testing tools and test BOPs. Cut and slip drill line. P/U drill pipe - ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity - Max @ ft - Morning Report Report # 11 Customer: Well: Area: Location: Min YP Max ECD (ppg) Tools Xceed675,PeriScope675,TeleScope675,NeoScope API FL PV - Avg @ Current Pump & Flow Data: Report For: 10778'7.8 - - Cor Solids 96% %Mud Type FazePro OBM N/A Ratio Mud Data Depth 71-29 4.23 BOW @ 10413'Hydril 563 WOB MDSi616-BPX TFA Condition 8.80 2 8.75 10778' 1-1-WT-A-E-I-NO-BHA 1 10437' 6.70 No Trip Gas 100% Gas In Air =10,000 Units -Connection Comments -Background TOW @ 10396' Trip (max) 0Average 0 ml/30min 2.60 2.00 341' 15 18 Smith Milled Tooth XR+ Mud C-3 Bit # 0 (lb/bbl) Lst Chromatograph (ppm) 0 00 C-4i C-4n Cement C-1 C-5i Sh Siltst cP Weight Flow In (gpm) Flow In (spm) Oil / Water Hours (lb/100ft 2) Casing Summary Lithology (%) 0.902 12 49 8.75 0.746 Footage (current) Units* Clyst Ss Cht Silt - Avg to 10778' Current -- MWD Summary Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Depth Job No.: Daily Charges: Total Charges: Rig Activity: Coal Gallons/stroke 0 Lime Tuff Gvl C-5n 0 0 from shed and makeup BHA #5 w/ Xceed. TIH t/ 1500' MD. Shallow hole test. TIH, filling pipe every 2500'. - Daily mud losses: 2 bbls in - - 0 0 0 0 -Minimum Depth Maximum 0 0 0 0 0 00 29-Apr-2014 12:00 AM 10778' 10778' 0' Depth in / out - Alkal C-2 Gas Summary - 0 907-685-1490 Unit Phone: 0 Josiah Failing Set At Size 40 # L-80 Grade OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E TIH Simonson / Ruminer Bit Type RPM 10778' 70 Size Type Report By: 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly . . * 24 hr Recap: Report By: 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly Bit Type RPM 10778' 70 Size Type OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E Drill Ahead Simonson / Sherman 907-685-1490 Unit Phone: 43 Josiah Failing Set At Size 40 # L-80 Grade Gas Summary 866 0 30-Apr-2014 12:00 AM 10778' 11422' 644' Depth in / out 490 Alkal 110 96342 023 24293 11176'Minimum Depth Maximum in 2 11351' 0 194 74 Open hole logs f/ 10430 t/ 10778' MD. Rotary drilling ahead f/ 10778' t/ 11422' MD. 254 Daily mud losses: 58 bbls 480 Gallons/stroke 0 Lime Tuff Gvl C-5n 0 170 Yesterday's Depth: Current Depth: 24 Hour Progress: 116 SPP (psi) Depth Job No.: Daily Charges: Total Charges: Rig Activity: 11422' Avg to 10778' Current 170.0 198.0 MWD Summary (current) Units* Clyst Ss Cht Silt Casing Summary Lithology (%) 0.902 14 47 8.75 0.746 Footage Weight Flow In (gpm) Flow In (spm) Oil / Water Hours (lb/100ft 2) Cement C-1 C-5i Sh Siltst Coal 17 46 C-4i C-4n 40 Chromatograph (ppm) 651 0 C-2 C-3 Bit # 0 (lb/bbl) Lst 31 ml/30min 2.21 1.70 341' 15 21 Average 46 Background Trip 154 100% Gas In Air =10,000 Units -Connection 1 10437' 6.70 Trip gas: 31 units Max gas while drilling: 866 units MDSi616-BPX TFA Condition 8.80 2 8.75 10778' 4.23 BOW @ 10413'Hydril 563 WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ %Mud Type FazePro OBM N/A Ratio Mud Data Depth 71-29 Mud cP Current Pump & Flow Data: Report For: 10778'9.0 10.25 11.77 Cor Solids 96% Min YP Max ECD (ppg) Tools Xceed675,PeriScope675,TeleScope675,NeoScope API FL PV 10.76 Avg Max @ ft 11334' Morning Report Report # 12 Customer: Well: Area: Location: @ Rig: Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity 2310 ROP ROP (ft/hr) 24 hr Max Density (ppg) 241.0 Continue TIH w/ 4.5" drill pipe t/ 7498' MD. Shallow hole test @ 2600' MD. Continue TIH w/ 5" drill pipe t/ 10430' MD. (max) . . * 24 hr Recap: Max gas while drilling: 958 units Daily mud losses: 153 bbls Rotary drill ahead f/ 11422' t/ 13242' MD. (max) 2410 ROP ROP (ft/hr) 24 hr Max Density (ppg) 245.0 Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity Max @ ft 12577' Morning Report Report # 13 Customer: Well: Area: Location: @ Rig: Min YP Max ECD (ppg) Tools Xceed675,PeriScope675,TeleScope675,NeoScope API FL PV 10.54 Avg Current Pump & Flow Data: Report For: 10778'8.8 10.19 10.82 Cor Solids 96% %Mud Type FazePro OBM N/A Ratio Mud Data Depth 76-24 Mud cP 4.23 BOW @ 10413'Hydril 563 WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ MDSi616-BPX TFA Condition 8.80 2 8.75 10778' 1 10437' 6.70 Daily mud losses: 153 bbls 100% Gas In Air =10,000 Units -Connection 83 Background Trip 434 Average - ml/30min 2.60 2.00 341' 15 13 Bit # 0 (lb/bbl) Lst 0 C-2 C-3 186 Chromatograph (ppm) 753 Cement C-1 C-5i Sh Siltst Coal Weight Flow In (gpm) Flow In (spm) Oil / Water Hours (lb/100ft 2) Casing Summary Lithology (%) 0.902 12 43 8.75 0.746 Footage (current) Units* Clyst Ss Cht Silt 13242' Avg to 10778' Current 183.0 189.0 MWD Summary Yesterday's Depth: Current Depth: 24 Hour Progress: 118 SPP (psi) Depth Job No.: Daily Charges: Total Charges: Rig Activity: Gallons/stroke 0 Lime Tuff Gvl C-5n 0 286 657 C-4i C-4n 116 230 0 346 180 555 12186'Minimum Depth Maximum in 3 395 104390 040 56498 1-May-2014 12:00 AM 11422' 13242' 1820' Depth in / out 500 Alkal Gas Summary 958 0 11631' 907-685-1490 Unit Phone: 104 Josiah Failing Set At Size 40 # L-80 Grade OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E Drill Ahead Simonson / Sherman Bit Type RPM 10778' 70 Size Type Report By: 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly . . * 24 hr Recap: 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly Max gas while drilling: 722 units Bit Type RPM 10778' 70 Size Type OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E Drill Ahead Simonson / Sherman 13386' 907-685-1490 Unit Phone: 126 Josiah Failing Report By: 722 0 Depth in / out 475 Alkal Gas Summary Set At Size 40 # L-80 2-May-2014 12:00 AM 13242' 15445' 2203' Grade 14758'Minimum Depth Maximum in 2 336 288 83237 134 211 543 C-4i C-4n 374 Gallons/stroke 0 Lime Tuff Gvl C-5n 0 312 Yesterday's Depth: Current Depth: 24 Hour Progress: 116 SPP (psi) Depth Job No.: Daily Charges: Total Charges: Rig Activity: 13242' Avg to 10778' Current 186.5 189.0 MWD Summary (current) Units* Clyst Ss Cht Silt Casing Summary Lithology (%) 0.902 13 44 8.75 0.746 Footage Weight Flow In (gpm) Flow In (spm) Oil / Water Hours (lb/100ft 2) Cement C-1 C-5i Sh Siltst Coal Chromatograph (ppm) 622 0 221 021 C-3 170 36117 Lst 0 C-2 ml/30min 3.25 2.50 341' 15 13 (lb/bbl) Average -55 Background Trip 298 =10,000 Units -Connection 0 1 10437' 6.70 Daily mud losses to formation: 79 bbls MDSi616-BPX TFA Condition 8.80 2 8.75 10778' Bit # 4.23 BOW @ 10413'Hydril 563 WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ %Mud Type FazePro OBM N/A Ratio Mud Data Depth 75-25 Mud cP Current Pump & Flow Data: Report For: 15310'10.0 10.22 11.23 Cor Solids 96% Min YP Max ECD (ppg) Tools Xceed675,PeriScope675,TeleScope675,NeoScope API FL PV 10.67 Avg Max @ ft 13624' Morning Report Report # 14 Customer: Well: Area: Location: @ Rig: Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity 2480 ROP ROP (ft/hr) 24 hr Max Density (ppg) 245.0 Rotary drill ahead f/ 13242' t/ 15445' MD. (max) 100% Gas In Air . . * 24 hr Recap: Rotary drill ahead f/ 15445' t/ 16882' MD. Back ream t/ 16499' MD. Prepare to sidetrack well. (max) 100% Gas In Air 2800 ROP ROP (ft/hr) 24 hr Max Density (ppg) 248.7 Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity Max @ ft 15926' Morning Report Report # 15 Customer: Well: Area: Location: @ Rig: Min YP Max ECD (ppg) Tools Xceed675,PeriScope675,TeleScope675,NeoScope API FL PV 10.67 Avg Current Pump & Flow Data: Report For: 16881'9.9 10.22 11.23 Cor Solids 96% %Mud Type FazePro OBM N/A Ratio Mud Data Depth 75-25 Mud cP 4.23 BOW @ 10413'Hydril 563 WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ MDSi616-BPX TFA Condition 8.80 2 8.75 10778' Bit # 1 10437' 6.70 Daily mud losses to formation: 80 bbls -Connection 0 56 Background Trip 300 Average - ml/30min 3.64 2.80 341' 15 15 (lb/bbl) 0 C-2 161 39280 Chromatograph (ppm) 664 0 198 047 C-3 Cement C-1 C-5i Sh Siltst Coal Weight Flow In (gpm) Flow In (spm) Oil / Water Hours (lb/100ft 2) Casing Summary Lithology (%) 0.902 13 45 8.75 0.746 Footage Clyst Ss Cht Silt Lst 16881' Avg to 10778' Current 177.7 - MWD Summary Yesterday's Depth: Current Depth: 24 Hour Progress: 120 SPP (psi) Depth Job No.: Daily Charges: Total Charges: Rig Activity: Gallons/stroke 0 Lime Tuff Gvl C-5n 0 322 560 C-4i C-4n 342 119 181 =10,000 Units 374 265 Minimum Depth Maximum in 5 (current) Units* 3-May-2014 12:00 AM 15445' 16881' 1436' Grade Depth in / out 507 Alkal Gas Summary Set At Size 40 # L-80 740 016096' 87527 15760' 907-685-1490 Unit Phone: 102 Josiah Failing Report By: OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E Prepare for Sidetrack Simonson / Sherman Bit Type RPM 10778' 70 Size Type 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly Max gas while drilling: 740 units . . * 24 hr Recap: 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly Max gas while drilling: 673 units 10778' 70 Size Type OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E Drill Ahead Simonson / Sherman 16751' 907-685-1490 Unit Phone: 58 Josiah Failing Report By: 673 017234' 82259 Depth in / out 494 Alkal Gas Summary Set At Size 40 # 4-May-2014 12:00 AM 16881' 17552' 671' Grade RPM Minimum Depth Maximum in 8 (current) Units* 180 91 57 71 =10,000 Units 380 C-4i C-4n 210 Gallons/stroke 0 Lime Tuff Gvl C-5n 0 217 Yesterday's Depth: Current Depth: 24 Hour Progress: 122 SPP (psi) Depth Job No.: Daily Charges: Total Charges: Rig Activity: 17552' Avg to 10778' Current 147.3 91.0 MWD Summary Ss Cht Silt Lst Casing Summary Lithology (%) 0.902 13 46 8.75 0.746 Footage Flow In (gpm) Flow In (spm) Oil / Water Hours (lb/100ft 2) Siltst Coal Weight Clyst L-80 128 032 C-3 Cement C-1 C-5i Sh 68 18635 0 C-2 Chromatograph (ppm) 531 ml/30min 3.77 2.90 341' 15 15 (lb/bbl) Average -71 Background Trip 116 -Connection 0 0 1 10437' 6.70 Daily mud losses to formation: 62 bbls MDSi616-BPX TFA Condition 8.85 2 8.75 10778' Bit # Bit Type 4.23 BOW @ 10413'Hydril 563 WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ %Mud Type FazePro OBM N/A Ratio Mud Data Depth 66-34 Mud cP Current Pump & Flow Data: Report For: 17193'9.7 10.53 11.33 Cor Solids 96% Min YP Max ECD (ppg) Tools Xceed675,PeriScope675,TeleScope675,NeoScope API FL PV 11.02 Avg Max @ ft 16711' Morning Report Report # 16 Customer: Well: Area: Location: @ Rig: Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity 2830 ROP ROP (ft/hr) 24 hr Max Density (ppg) 239.5 Sidetrack from OP16-03L1 PB1 @ 16499' MD. Rotary drill ahead f/ 16499' t/ 17552' MD. (max) 100% Gas In Air . . * 24 hr Recap: Rotary drill ahead f/ 17552' t/ production TD @ 17610' MD, 3383' TVD. Begin BROOH. BROOH t/ 10274' MD. (max) 100% Gas In Air 1480 ROP ROP (ft/hr) 24 hr Max Density (ppg) 172.9 Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity Max @ ft 17559' Morning Report Report # 17 Customer: Well: Area: Location: @ Rig: Min YP Max ECD (ppg) Tools Xceed675,PeriScope675,TeleScope675,NeoScope API FL PV 10.88 Avg Current Pump & Flow Data: Report For: 17193'8.8 10.88 11.00 Cor Solids 96% %Mud Type FazePro OBM N/A Ratio Mud Data Depth 73-27 Mud cP 4.23 BOW @ 10413'Hydril 563 WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ TFA Condition 8.85 2 8.75 10778' Bit # Bit Type MDSi616-BPX Max gas while BROOH: 73 units -Connection 0 0 71 Background Trip (lb/bbl) Average 73 0 C-2 Chromatograph (ppm) 62 39 31 8243 025 C-3 Cement C-1 C-5i Sh Oil / Water Hours (lb/100ft 2) Siltst Weight Clyst 13 46 8.75 0.746 Footage 341' 16 10437' 6.70 Lst Casing Summary Lithology (%) L-80 130.6 - MWD Summary Ss Cht Silt 0.902 1 Depth Job No.: Daily Charges: Total Charges: Rig Activity: 17610' Avg to 10778' Current 41 Yesterday's Depth: Current Depth: 24 Hour Progress: 95 SPP (psi) Flow In (gpm) Flow In (spm) Coal 0 Lime Tuff Gvl C-5n 0 38 ml/30min 38 C-4i C-4n 38 32 30 =10,000 Units 83 Daily total mud losses: 135 bbls 27 Minimum Depth Maximum in 8 (current) Units* 5-May-2014 12:00 AM 17552' 17610' 58' Grade RPM Gallons/stroke 3.90 3.00 Depth in / out 394 Alkal Gas Summary Set At Size 40 # 118 017597' 13090 17608' 907-685-1490 Unit Phone: 17 Josiah Failing Report By: OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E BROOH Simonson / Sherman 10778' 70 Size Type 15 9 5/8" Logging Engineers: J. Failing / A. Bongard (max) (current) Cly Max gas while drilling: 118 units . . * 24 hr Recap: Logging Engineers: J. Failing / A. Bongard (max) (current) Cly 10778' 70 120.0 Size Type 15 5.0 OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E TIH Simonson / Sherman - 907-685-1490 Unit Phone: 0 Josiah Failing Report By: - 0- 0 Depth in / out - Alkal Gas Summary Set At Size 40 # 6-May-2014 12:00 AM 17610' 17610' 0' Grade RPM Gallons/stroke 3.90 3.00 Minimum Depth Maximum in - (current) Units* P/U whipstock retrieval BHA. TIH w/ 4.5 drill pipe t/ 8080' MD. Continue TIH for whipstock retrieval. - Daily total mud losses: 6 bbls 0 00 =10,000 Units 0 C-4i C-4n 0 0 Lime Tuff Gvl C-5n 0 0 ml/30min Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Flow In (gpm) Flow In (spm) Depth Job No.: Daily Charges: Total Charges: Rig Activity: 17610' Avg to 10778' Current -- MWD Summary Ss Cht Silt 0.902 1 Lst Casing Summary Lithology (%) L-80 Coal 9 5/8" 13 46 7214' 8.75 0.746 Footage 341' 16 10437' 6.70 Oil / Water Hours (lb/100ft 2) Siltst Weight Clyst 00 C-3 Cement C-1 C-5i Sh 0 00 0 C-2 Chromatograph (ppm) 0 0 (lb/bbl) Average 22 -Background Trip MDSi616-BPX Max gas while BROOH: 22 units -Connection 0 0 TFA Condition 0-0-NO-A-X-I-NO-TD 8.85 2 8.75 10778' Bit # Bit Type 59.80 4.23 BOW @ 10413'Hydril 563 17610' WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ %Mud Type FazePro OBM N/A Ratio Mud Data Depth 73-27 Mud cP Current Pump & Flow Data: Report For: 17610'8.8 9.76 9.88 Cor Solids 96% Min YP Max ECD (ppg) Tools Xceed675,PeriScope675,TeleScope675,NeoScope API FL PV 10.24 Avg Max @ ft - Morning Report Report # 18 Customer: Well: Area: Location: @ Rig: Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity - ROP ROP (ft/hr) 24 hr Max Density (ppg) - Continue BROOH t/ 7498' MD. Service rig and top drive. Pump dry job, TOOH on elevators t/ surface. L/D BHA #5. (max) 100% Gas In Air . . * 24 hr Recap: Continue TIH t/ 10406' MD. Orientate toolface and latch on to whipstock. Retrieval successful. Pump dry job. TOOH (max) 100% Gas In Air - ROP ROP (ft/hr) 24 hr Max Density (ppg) - Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity Max @ ft - Morning Report Report # 19 Customer: Well: Area: Location: @ Rig: ECD (ppg) Tools - API FL PV - Avg 17610'10.0 - - Cor Solids Min YP Max %Mud Type FazePro OBM N/A Ratio Mud Data Depth 73-27 Mud cP 4.23 BOW @ 10413'Hydril 563 17610' WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ TFA Condition 0-0-NO-A-X-I-NO-TD 8.80 2 8.75 10778' Bit # Bit Type 59.80 Trip gas: 282 units while TIH 0 -Connection 0 Background Trip Average 282 - 0 0 C-2 Chromatograph (ppm) 0 0 00 C-3 Cement C-1 C-5i Sh Oil / Water Hours (lb/100ft 2) Siltst Weight Clyst 15 48 7214' 8.75 0.746 Footage 341' 14 10437' 6.70 Casing Summary Lithology (%) L-80 Coal 9 5/8" Ss Cht Silt 0.902 1 Lst MDSi616-BPX - Avg to - Current -- MWD Summary Flow In (gpm) Flow In (spm) Depth Job No.: Daily Charges: Total Charges: Rig Activity: Current Pump & Flow Data: Report For: 96% 0 ml/30min Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) 0 (lb/bbl) 0 0 Lime Tuff Gvl C-5n 0 00 =10,000 Units t/ surface. L/D whipstock retrieval BHA. TIH t/ 10856' MD. Circulate and spot 37 bbl brine pill @ 10853' MD. Pump dry job. TOOH -0 Daily total mud losses: 28 bbls 0 in - (current) Units* 0 2.35 Minimum Depth Maximum C-4i C-4n 40 # 7-May-2014 12:00 AM 17610' 17610' 0' Grade RPM Gallons/stroke 3.06 Depth in / out - Alkal Gas Summary Set At Size - 0- 0- 907-685-1490 Unit Phone: 0 Josiah Failing Report By: OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E TOOH Simonson / Sherman 10778' 70 120.0 Size Type 15 5.0 Logging Engineers: J. Failing / A. Bongard (max) (current) Cly t/ 7280' MD. Continue TOOH. . . * 24 hr Recap: Logging Engineers:M. Sherry / A. Bongard (max)(current) Cly Continue RIH t/ 10292'; fill pipe every 1000' per BOT rep. Continue RIH t/ 10856'; tag top of packer; POOH to 10674'. Size Type 15 5.0 OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E RIH w/ liner Simonson / Sherman 8777' 907-685-1490Unit Phone: 0 Michael SherryReport By: 11 0- 650 Depth in / out - Alkal Gas Summary Set AtSize 17610' 0' Grade RPM Gallons/stroke 3.06 70 120.0 2.35 Minimum Depth Maximum C-4i C-4n in 0 (current) Units* 11 PU; LD; MU tools/BHA as per GBR. RIH w/ liner to 7378'. PU liner hanger. Prep floor and RIH w/ 5" DP to 7802'. Fill pipe. 4 5 Daily total mud losses: 8 bbls 0 06 =10,000 Units 9 0 Lime TuffGvl C-5n 0 ml/30min Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) (lb/bbl) 8-May-2014 12:00 AM 17610' Flow In (gpm) Flow In (spm) Depth Job No.: Daily Charges: Total Charges: Rig Activity: Current Pump & Flow Data: Report For: 96% - Avg to- Current -- MWD Summary Ss Cht Silt 0.902 1 Lst MDSi616-BPX 40 # 10778' Casing Summary Lithology (%) L-80 Coal 9 5/8" 48 7214' 8.75 0.746 Footage 341' 14 10437' 6.70 Hours (lb/100ft2) Siltst Weight Clyst 15 C-3 Cement C-1 C-5i Sh 69 4 00 0 C-2 Chromatograph (ppm) 9 Average -2 Trip 77 -Connection 0 Background Trip gas: There has not been enough mud circulated to receive trip gas. 0 TFA Condition 0-0-NO-A-X-I-NO-TD 8.80 2 8.75 10778' Bit #Bit Type 59.80 4.23 BOW @ 10413'Hydril 563 17610' WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ %Mud Type FazePro OBM N/A Ratio Mud Data Depth 73-27 MudcP 17610'10.0 -- Cor Solids Min YP MaxECD (ppg) Tools - API FLPV - Avg Oil / Water Max @ ft - Morning Report Report # 20 Customer: Well: Area: Location: @ Rig: Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity - ROP ROP (ft/hr) 24 hr Max Density (ppg) - TOOH w/ 5" DP t/ 3671'. Cut 6 wraps of drilling line. Rig service. TOOH t/ surface. Clean rig/platform. Completion: (max)100% Gas In Air . . * 24 hr Recap: 341' Condition Logging Engineers:M. Sherry / A. Bongard (max)(current) Cly OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E TOOH/LD with 5" DP Simonson / Sherman 17525' 907-685-1490Unit Phone: - Michael SherryReport By: 384 0- - Flow In (gpm) Depth in / out - Alkal Gas Summary Set AtSize RPM Gallons/stroke - 70 120.0 - 15 5.0 Minimum Depth Maximum Ss Cht Silt C-4i C-4n in 0 (current) Units* -- Packer set at 10186’. Displace to water-based from 10151’ to surface with 707 bbl 8.8 ppg. Displace to completion fluid. Service 16 Trip gas: 384 units of trip gas observed. Daily total mud losses: 15 bbl of oil-based mud lost downhole. -Average rig. Lay down drill pipe from 10151’ to 6837’. Trip in hole with last 8 stands from derrick from 6837’ to 7571’. Continue to lay down -- =10,000 Units - 0 Lime TuffGvl C-5n 0 ml/30min Grade (lb/bbl) 9-May-2014 12:00 AM 17610' % 17610' 0' 96%4.23 Max Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi) Job No.: Daily Charges: Total Charges: Rig Activity: Current Pump & Flow Data: Report For: Avg to- Current -- MWD Summary Depth 1 Lst MDSi616-BPX 40 # 10778' Casing Summary Lithology (%) L-80 Coal 9 5/8" - 7214' 8.75 0.746 Footage 10437' 6.70 Hours (lb/100ft2) - TFA - Flow In (spm) Size Siltst Weight Clyst Type C-3 Cement C-1 C-5i Sh -- 00 - 0 C-2 Chromatograph (ppm) - 3840Trip - drill pipe. -Connection - Background 0 2 8.75 10778' Bit #Bit Type 59.800.902 BOW @ 10413'Hydril 563 17610' WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ 0-0-NO-A-X-I-NO-TD Mud Type KCl Brine - Ratio Mud Data Depth - YP 8.80 - MudcP 17610'- -- Cor Solids MinECD (ppg) Tools - API FLPV - Avg Oil / Water Max @ ft - Morning Report Report # 21 Customer: Well: Area: Location: @ Rig: Date: Time: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity - ROP ROP (ft/hr) 24 hr Max Density (ppg) - Trip out of hole from 10674’ to 10393’. Trip in hole from 10393’ to 17610’; pick up 5’. Circulate and condition. (max)100% Gas In Air . . * 24 hr Recap: (max)100% Gas In Air Lay down drill pipe from 900’ to 39’. Lay down BHA, change elevators, clean rig floor. Trip in hole with 4.5” drill Density (ppg) - Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity ROP ROP (ft/hr)- Morning Report Report # 22 Customer: Well: Area: Location: @ Rig: Date: - API FLPV - Avg Oil / Water 17610'- -- Cor Solids MinECD (ppg) Tools Mud Type KCl Brine - Ratio Mud Data Depth - YP 8.80 - BOW @ 10413'Hydril 563 17610' WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ 0-0-NO-A-X-I-NO-TD28.75 10778' Bit #Bit Type 59.800.902 0 -Connection - Background 0 Trip - - 0 C-2 Chromatograph (ppm) - 00 - C-3 Cement C-1 C-5i Sh -- Siltst Weight Clyst Type 6.70 Hours (lb/100ft2) - TFA - Flow In (spm) Size cP Coal 9 5/8" - 7214' 8.75 0.746 Footage 10437' 1 Lst MDSi616-BPX 40 # 10778' Casing Summary Lithology (%) L-80 Avg to- Current -- MWD Summary Depth Job No.: Daily Charges: Total Charges: Rig Activity: Current Pump & Flow Data: Report For: Max @ ft Time: 24 hr Max Max Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi)- 10-May-2014 12:00 AM 17610' % 17610' 0' 96%4.23 0 Lime TuffGvl C-5n 0 ml/30min Grade -- =10,000 Units --Average shoe. Install/remove wear bushing. Pick up 3rd party tools. Service rig. Continue to pick up tools. Rig up wireline. - pipe from surface to 7230’. Circulate and condition pumping citric pill. Lay down drill pipe from 7230’ to surface. Lay down mule 0 Max gas: 2 units of gas observed. Daily total mud losses: 0 bbl lost downhole. C-4i C-4n in 0 (current) Units* - Minimum Depth Maximum Ss Cht Silt RPM Gallons/stroke - 70 120.0 - 15 5.0 (lb/bbl)Mud Flow In (gpm) Depth in / out - Alkal Gas Summary Set AtSize 2 0- -- 907-685-1490Unit Phone: - Michael SherryReport By: Cly OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E TOOH/LD with 5" DP Simonson / Sherman 341' Condition Logging Engineers:M. Sherry / A. Bongard (max)(current) . . * 24 hr Recap: 341' Condition Logging Engineers:M. Sherry / A. Bongard (max)(current) OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E RIH with 4.5" tubing Simonson / Sherman - 907-685-1490Unit Phone: - Michael SherryReport By: - 0- - Flow In (gpm) Depth in / out - Alkal Gas Summary Set AtSize Gallons/stroke - 70 120.0 - 15 5.0 (lb/bbl)Mud Minimum Depth Maximum Ss Cht Silt C-4i C-4n in - (current) Units* -- tools/BHA from surface to 204’. BCL hands splice ½ mile. Change out sheave. Start running in hole; make up cap TOOB clamp - Max gas: There was no significant gas observed. Daily total mud losses: There were 0 barrels lost downhole. -Average splice. Continue to pick up 4.5” tubing from 204’ to 846’ per tally; clamp every collar. -- =10,000 Units - 0 ml/30min Grade RPM % 17610' 0' 96%4.23 Lime TuffGvl Max Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi)- 11-May-2014 12:00 AM 17610'Job No.: Daily Charges: Total Charges: Rig Activity: Current Pump & Flow Data: Report For: Max @ ft Time: 24 hr MaxAvg to- Current -- MWD Summary Depth 1 Lst MDSi616-BPX 40 # 10778' Casing Summary Lithology (%) L-809 5/8" - 7214' 8.75 0.746 Footage 10437' Cly 6.70 Hours (lb/100ft2) - TFA - Flow In (spm) Size cP Weight Clyst Type Coal Cement C-1 C-5i Sh -- Siltst 00 - C-2 Chromatograph (ppm) - C-3 C-5n - -Trip - 0 00 -Connection 2 8.75 10778' Bit #Bit Type 59.800.902 BOW @ 10413'Hydril 563 17610' WOB 1-1-WT-A-E-I-NO-BHA Comments TOW @ 10396' Smith Milled Tooth XR+ 0-0-NO-A-X-I-NO-TD Mud Type KCl Brine - Ratio Mud Data Depth - YP 8.80 -17610'- -- Cor Solids MinECD (ppg) Tools - API FLPV - Avg Oil / Water - Morning Report Report # 23 Customer: Well: Area: Location: @ Rig: Date: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity ROP ROP (ft/hr) Density (ppg) - Background - (max)100% Gas In Air Set pump/pack-off. PSI test. Rig down test equipment and slickline. Completion: pick up, lay down, make up . . * 24 hr Recap: Completion: pick up, lay down, make up tools/BHA; cable to cable splice. Trip tubing/drill pipe. Continue to pick up Background - (max) ROP ROP (ft/hr) Density (ppg) - Rig: Date: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity - Avg Oil / Water - Morning Report Report # 24 Customer: Well: Area: Location: -- Cor Solids MinECD (ppg) Tools - API FL Mud Data Depth - YP 8.80 -17610' PV TOW @ 10396' Smith Milled Tooth XR+ 0-0-NO-A-X-I-NO-TD Mud Type KCl Brine - Ratio - Connection 2 8.75 10778' Bit #Bit Type 59.800.902 Hydril 563 17610' 00 - - 0 Trip C-5n - - - C-2 Chromatograph (ppm) --- Siltst 00 C-3 Type Coal Cement C-1 C-5i Sh (lb/100ft2) - TFA - Flow In (spm) Size cP WOB 0.746 Footage 10437' Cly 6.70 Hours Weight Clyst 1 Lst MDSi616-BPX 40 # 10778' Casing Summary Lithology (%) L-80 Avg to- Current -- MWD Summary Depth Job No.: Daily Charges: Total Charges: Rig Activity: Current Pump & Flow Data: Report For: Max @ ft Time: 24 hr Max Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi)- 12-May-2014 12:00 AM 17610' @ 17610' 0' 96%4.23 Lime Max BOW @ 10413' 1-1-WT-A-E-I-NO-BHA Comments ml/30min Grade RPM % TuffGvl -- =10,000 Units - 100% Gas In Air -Average Make cable change splice. Trip in hole to 8191’. Make gator splice on ESP; test same. Continue in hole to 8669’. - 4.5” tubing from 846’ to 5020’; clamp every collar; test every 1000’. Continue tripping from 5020’ to 7902’. Change out spools. - Max gas: There was no significant gas observed. Daily total mud losses: There were 0 barrels lost downhole. - (current) Units* - 0 Silt C-4i C-4n in 9 5/8" - 7214' 8.75 (lb/bbl)Mud Minimum Depth Maximum Ss Cht - 70 120.0 - 15 5.0 Flow In (gpm) Depth in / out - Alkal Gas Summary Set AtSize 907-685-1490Unit Phone: - Michael SherryReport By: - 0 RIH with 4.5" tubing Simonson / Sherman - - - Logging Engineers:M. Sherry / A. Bongard (max)(current) OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E 341' Condition Gallons/stroke . . * 24 hr Recap: 341' Condition Gallons/stroke M. Sherry / A. Bongard (max)(current) OP16-03L1 Nikaitchuq Field Oliktok Point Nabors 245E Preparing to move rig Simonson / Sherman - - - Unit Phone: - Michael SherryReport By: - 0 Logging Engineers: Flow In (gpm) Depth in / out - Alkal Gas Summary Set AtSize - 70 120.0 - 15 5.0 (lb/bbl)Mud Minimum Depth Maximum Ss Cht C-4i C-4n in 9 5/8" - 7214' 8.75 - (current) Units* - 0 - Pick up and assemble hanger assembly. Install penetrator. Make up lower connector splice and test as per Baker. Orient and land - to OP05-06. Max gas: There was no significant gas observed. -Average hanger at 9132’. Run downhole pumps and test upper and lower seals; test good. Lay down landing joint. Clean rig floor. Nipple -- =10,000 Units - 100% Gas In Air ml/30min Grade RPM % TuffGvl 17610' 0' 96%4.23 Lime Max BOW @ 10413' 1-1-WT-A-E-I-NO-BHA Comments Yesterday's Depth: Current Depth: 24 Hour Progress: - SPP (psi)- 13-May-2014 12:00 AM 17610' @ Job No.: Daily Charges: Total Charges: Rig Activity: Current Pump & Flow Data: Report For: Max @ ft Time: 24 hr MaxAvg to- Current -- MWD Summary Depth 1 Lst MDSi616-BPX 40 # 10778' Casing Summary Lithology (%) L-80 0.746 Footage 10437' Cly 6.70 Hours Weight Clyst - TFA - Flow In (spm) Size cP WOB Type Coal Cement C-1 C-5i Sh -- Siltst 00 C-3 Silt - C-2 Chromatograph (ppm) - C-5n - -Trip 0 down BOPs, clean up cellar. Nipple up riser and spacer spools, void riser of fluid, nipple down and pull to rig floor. Prepare - - 2 8.75 10778' Bit #Bit Type 59.800.902 TOW @ 10396' Smith Milled Tooth XR+ 0-0-NO-A-X-I-NO-TD Mud Type KCl Brine - Ratio - Hydril 563 17610' Mud Data Depth - YP 8.80 -17610' PV (lb/100ft2) -- Cor Solids MinECD (ppg) Tools - API FL - Avg Oil / Water - Morning Report Report # 25 Customer: Well: Area: Location: Rig: Date: Eni Petroleum AK-AM-0901288163 out (sec/qt) Viscosity ROP ROP (ft/hr) Density (ppg) - 00 Background - (max) Connection Completion: continue to run in hole with 4.5” tubing from 8669’ to 9091’. Rig down Volant tool. Change elevators. Daily total mud losses: There were 0 barrels lost downhole. wellhead to accept tree; no visible leaks. Test tree. Mobilization: secure floor, cellar and wellbay. Continue to prepare to move rig 907-685-1490 WELL INFORMATION Created On : Jun 03 2014 Customer :ENI U.S. Operating Well Name :OP16-03L1 Job Number :AK-XX-0901288163 Rig Name :Nabors 245E Field Name :Nikaitchuq Country :USA Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 10392.51 85.18 313.21 3419.34 2,140.74 N 8,303.59 W (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10396.00 86.14 313.40 3,419.59 2,143.13 N 8,306.12 W 8042.64 28.04 10413.00 86.88 312.47 3,420.64 2,154.68 N 8,318.55 W 8059.44 6.98 10492.19 90.14 314.70 3,422.70 2,209.25 N 8,375.88 W 8137.66 4.99 10588.23 88.82 319.30 3,423.57 2,279.47 N 8,441.35 W 8231.51 4.98 10684.04 88.02 324.05 3,426.21 2,354.58 N 8,500.73 W 8323.14 5.03 10780.20 89.58 328.60 3,428.23 2,434.56 N 8,554.02 W 8412.56 5.00 10875.56 90.97 333.10 3,427.77 2,517.82 N 8,600.45 W 8498.22 4.94 10971.38 90.47 337.57 3,426.57 2,604.87 N 8,640.43 W 8580.74 4.69 11067.35 89.08 335.54 3,426.94 2,692.91 N 8,678.61 W 8662.36 2.56 11162.58 87.69 332.46 3,429.63 2,778.46 N 8,720.33 W 8745.46 3.55 11257.75 88.21 330.92 3,433.03 2,862.19 N 8,765.43 W 8830.29 1.71 11353.58 90.25 328.93 3,434.32 2,945.10 N 8,813.45 W 8917.05 2.97 11449.48 90.22 327.59 3,433.93 3,026.65 N 8,863.90 W 9005.04 1.40 11545.55 90.03 324.13 3,433.72 3,106.16 N 8,917.80 W 9094.69 3.61 11640.99 90.66 320.88 3,433.14 3,181.87 N 8,975.89 W 9185.60 3.47 11736.78 90.59 318.35 3,432.10 3,254.82 N 9,037.94 W 9278.20 2.64 11832.55 88.81 316.93 3,432.60 3,325.58 N 9,102.47 W 9371.58 2.38 11928.26 89.12 312.99 3,434.33 3,393.19 N 9,170.17 W 9465.76 4.13 12024.08 89.70 310.21 3,435.32 3,456.79 N 9,241.81 W 9560.90 2.96 12119.77 90.34 310.75 3,435.28 3,518.91 N 9,314.60 W 9656.12 0.88 12215.67 88.18 313.34 3,436.52 3,583.12 N 9,385.80 W 9751.24 3.52 12311.48 88.11 313.37 3,439.62 3,648.86 N 9,455.43 W 9845.94 0.08 12407.31 87.76 314.60 3,443.08 3,715.37 N 9,524.33 W 9940.48 1.33 12503.18 88.58 316.61 3,446.14 3,783.83 N 9,591.36 W 10034.60 2.26 12598.92 89.75 316.61 3,447.53 3,853.40 N 9,657.13 W 10128.31 1.22 12694.68 88.35 313.81 3,449.12 3,921.34 N 9,724.57 W 10222.47 3.27 12790.82 90.18 311.17 3,450.35 3,986.27 N 9,795.45 W 10317.73 3.34 12887.15 89.46 309.97 3,450.66 4,048.92 N 9,868.62 W 10413.58 1.45 12981.37 88.09 308.11 3,452.67 4,108.24 N 9,941.78 W 10507.51 2.45 13077.15 89.97 305.74 3,454.29 4,165.77 N 10,018.33 W 10603.20 3.16 13172.95 89.88 303.46 3,454.42 4,220.17 N 10,097.18 W 10699.00 2.38 INSITE V8.0.20 Page 1Job No:AK-XX-0901288163 Well Name:OP16-03L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 13268.76 89.68 301.28 3,454.79 4,271.46 N 10,178.10 W 10794.71 2.28 13364.64 90.50 299.83 3,454.64 4,320.20 N 10,260.66 W 10890.32 1.74 13460.24 91.18 298.05 3,453.23 4,366.45 N 10,344.31 W 10985.41 1.99 13556.29 90.76 296.97 3,451.61 4,410.81 N 10,429.49 W 11080.66 1.21 13651.85 90.50 291.26 3,450.56 4,449.83 N 10,516.66 W 11174.51 5.98 13747.66 91.68 287.90 3,448.73 4,481.93 N 10,606.90 W 11266.92 3.72 13843.46 92.57 287.86 3,445.18 4,511.32 N 10,698.01 W 11358.50 0.93 13939.26 92.94 286.82 3,440.58 4,539.84 N 10,789.35 W 11449.77 1.15 14034.94 92.92 287.98 3,435.69 4,568.42 N 10,880.53 W 11540.94 1.21 14130.58 91.97 287.92 3,431.61 4,597.86 N 10,971.43 W 11632.38 1.00 14226.51 92.02 285.18 3,428.27 4,625.17 N 11,063.32 W 11723.41 2.86 14322.26 93.37 289.25 3,423.76 4,653.47 N 11,154.66 W 11814.55 4.47 14418.16 91.91 290.76 3,419.34 4,686.24 N 11,244.68 W 11907.16 2.19 14514.04 91.67 293.42 3,416.35 4,722.28 N 11,333.47 W 12000.63 2.78 14609.95 91.55 295.37 3,413.65 4,761.87 N 11,420.77 W 12094.92 2.04 14705.61 89.09 295.46 3,413.12 4,802.92 N 11,507.17 W 12189.28 2.57 14801.44 88.76 295.27 3,414.92 4,843.97 N 11,593.75 W 12283.79 0.40 14896.92 89.69 294.60 3,416.21 4,884.22 N 11,680.32 W 12377.84 1.20 14993.71 86.69 293.47 3,419.27 4,923.61 N 11,768.66 W 12472.87 3.31 15088.59 87.47 291.00 3,424.10 4,959.47 N 11,856.36 W 12565.34 2.73 15184.35 88.51 292.28 3,427.46 4,994.76 N 11,945.31 W 12658.51 1.72 15280.03 87.39 291.89 3,430.88 5,030.71 N 12,033.92 W 12751.78 1.24 15376.08 91.79 291.29 3,431.57 5,066.04 N 12,123.20 W 12845.25 4.62 15471.86 95.40 291.57 3,425.56 5,100.96 N 12,212.17 W 12938.23 3.78 15567.82 94.44 291.88 3,417.33 5,136.35 N 12,300.98 W 13031.35 1.05 15664.06 94.07 291.37 3,410.19 5,171.72 N 12,390.20 W 13124.79 0.65 15759.24 92.76 290.95 3,404.52 5,206.01 N 12,478.81 W 13217.11 1.45 15855.11 91.47 289.95 3,400.99 5,239.49 N 12,568.57 W 13309.92 1.70 15950.72 90.29 289.17 3,399.52 5,271.49 N 12,658.65 W 13402.14 1.48 16046.48 88.51 288.15 3,400.52 5,302.13 N 12,749.37 W 13494.11 2.14 16142.19 87.72 288.08 3,403.67 5,331.87 N 12,840.28 W 13585.73 0.83 16238.19 91.54 288.48 3,404.29 5,361.97 N 12,931.42 W 13677.74 4.00 16334.27 88.58 290.27 3,404.19 5,393.84 N 13,022.04 W 13770.33 3.60 16430.04 91.72 290.58 3,403.94 5,427.26 N 13,111.78 W 13863.08 3.29 16527.06 91.85 293.60 3,400.91 5,463.72 N 13,201.63 W 13957.66 3.11 16621.66 90.57 296.68 3,398.92 5,503.90 N 13,287.23 W 14050.88 3.53 16717.45 91.91 298.03 3,396.84 5,547.90 N 13,372.29 W 14145.83 1.99 16813.10 91.62 301.69 3,393.90 5,595.49 N 13,455.19 W 14241.06 3.84 16908.65 88.39 304.43 3,393.89 5,647.61 N 13,535.25 W 14336.55 4.43 17004.80 85.37 307.07 3,399.12 5,703.68 N 13,613.15 W 14432.52 4.17 17100.57 87.45 307.11 3,405.12 5,761.32 N 13,689.39 W 14528.03 2.17 17196.14 89.03 308.20 3,408.05 5,819.68 N 13,765.02 W 14623.43 2.01 17291.84 92.53 310.34 3,406.75 5,880.23 N 13,839.08 W 14718.81 4.29 17387.12 93.10 313.63 3,402.07 5,943.88 N 13,909.81 W 14813.22 3.50 17483.08 95.52 316.73 3,394.86 6,011.74 N 13,977.25 W 14907.33 4.09 INSITE V8.0.20 Page 2Job No:AK-XX-0901288163 Well Name:OP16-03L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 17544.46 95.13 318.94 3,389.16 6,057.04 N 14,018.27 W 14966.87 3.64 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 304.82 degrees (True) - A total correction of 19.36 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 17,544.46 feet is 15,270.88 feet along 293.37 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.20 Page 3Job No:AK-XX-0901288163 Well Name:OP16-03L1 Survey Report