HomeMy WebLinkAbout214-068 Technical Report Title Date Client: Eni Petroleum Field: Nikaitchuq Rig: Doyon 15 Date: July 25, 2014 Surface Data Logging End of Well Report SP12-SE3 SP12-SE3 L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Show Reports 7. Mud Record 8. Bit Record 9. Morning Reports 10. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Doyon 15 Well: SP12-SE3 & SP13-SE3 L1 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-629-23513-00-00 (SP12-SE3) 50-629-23513-60-00 (SP13-SE3 L1) Sperry Job Number: AK-XX-0901412968 Job Start Date: 6 June 2014 Spud Date: 8 June 2014 Total Depth: 15,216’ MD, 4,063’ TVD (SP12-SE3) 15,245’ MD, 4,050’ TVD (SP12-SE3 L1) North Reference: True Declination: 19.260° Dip Angle: 81.055° Total Field Strength: 57623 nT Date Of Magnetic Data: 6 June 2013 Wellhead Coordinates N: North 70° 33’ 28.067” Wellhead Coordinates W: West 149° 54’ 16.167“ Drill Floor Elevation 53.93’ Ground Elevation: 13.10’ Permanent Datum: Mean Sea Level SDL Engineers: Leigh Ann Rasher, Kori Jo Plowman Doug Acker, Jane Grundin, Danielle Dawson SDL Sample Catchers: Hilary Garney, Danielle Dawson, David Durst, Megan Cardenas Company Geologist: Andrew Buchanan Company Representatives: Ben Perry, Jack Keener, Russ Wimmer, Mike Ross, Oliver Amend SSDS Unit Number: 110 DAILY SUMMARY 06/06/2014 SDL continued on location from previous well. Spott and set mudlogging shack. Wait on the unit to warm up before rigging up. Rig up mudlogging unit. Nipple up diverter system and make up hanger. Perform a dummy run and diverter test. 06/07/2014 Nipple up diverter stack and test. Rig up secondary kill line, kill well SI11 with 200 barrels of 9.6 ppg brine, and perform dummy run on 13 ⅜" hanger, install diverter pup. Rig up and bleed OA pressure, rig down equipment. Perform diverter test. Load rig floor with BHA tools. 06/08/2014 Install skirt around stack, prepare handling equipment for BHA. Pick up BHA #1. Pre SPUD meeting, flood conductor, test surface lines. Clean out conductor to 160 MD'. Pull out of hole to 33' MD and then picked up BHA #2. Troubleshoot MWD software. Shallow hole test Gyropulse / MWD at 160' MD. Drill from 160' MD to 392' MD. Pump out of hole. Make up remaining BHA #2, wash down to 392' MD. Drill from 392' MD to 1059’ MD. Gas: The maximum gas was 37 units at 1023’ MD and the average gas was 9 units. 06/09/2014 Drill from 1059' MD to 2883' MD. Monitor static well. Back ream out of hole from 2883' MD to 2783' MD. Gas: The maximum gas was 752 units at 1962’ MD and the average gas was 119 units. 06/10/2014 Backed ream out of hole as per K&M from 2783' MD to 406' MD. Pull out of hole from 406' MD to 123' MD. Set back 2 stands of heavyweight drill pipe. Blow down the top drive. Lay down BHA #2 as per SLB. Rig up Volant casing equipment. Make up 13 ⅜" shoe track to 121' MD and test. Run in hole with casing to 1000' MD. Continue running in with casing from 1000' MD to 1780' MD. Pull back to 1760' MD, would not go past 1780' MD. Attempt to break circulation and pressure up to 650 psi with no returns (shoe plugged). Then attempted to free with 3000psi; no returns. Rotate out of hole from 1760' MD to 1485' MD. Gas: The maximum wiper gas was 798 units. 06/11/2014 Pull out of hole from 1485' MD to 82' MD with 13 ⅜" casing, laid down in pipe shed. Drain shoe track and cut all connections, laid down same. Clean/clear rig floor, rig down Volant, laid down GBR casing tongs, bring 15 ⅞" stab and 12 ¼" bit to floor. Clean rig floor. Lubricate rig. Pick up and make up BHA #3 to 576' MD; trip in hole from 576' MD to 2817' MD. At 2817' MD break circulation, wash down and tag bottom at 2883' MD. Back ream out of hole from 2883' MD to 1275' MD as per K&M Gas: The maximum wiper/trip gas was 133 units. 06/12/2014 Back ream out of hole as per K&M from 1276' MD to 297' MD. Laid down BHA #3. Blow down top drive, clean and clear rig floor. Rig up to run casing as per GBR. Run in hole to 2202' MD with 13 ⅜" casing as per detail, fill and circulate every 10 joints. Continue to run in the hole with casing from 2202' MD to 2837’ MD. Break circulation every 10 joints. Make up landing joint/hanger, land at 2877' MD. Circulate and condition mud for cementing, weight up mud push. Pump cement as per plan. Pressure test cement line, pump 103 barrels mud push, 469 barrels lead slurry, 65 barrels tail slurry, chase with spud mud, bump plug at 405 barrels, with 75 barrels cement returns. Rig down all equipment and rig down casing equipment. Gas: No gas was observed. 06/13/2014 Nipple down surface stack and nipple up BOPE. Prepare surface hanger. Nipple up wellhead, test connections to 2000 psi. Nipple high-psi riser. Nipple up BOP and test plug, perform BOP and choke body test, rigged down test equipment (good test). Prepare to change saver sub and install a new saver sub, load and process 5" drill pipe in shed. Lubricate rig. Continue to load and process 5" drill pipe. Make up stands and rack back. Gas: No gas was observed. 06/14/2014 Make up stands of 5" drill pipe and rack back in derrick. Rig up and begin testing BOPE. Change out upper seals on pipe rams. Change out upper and lower IBOP's. Rig up to test BOP. BOP test, witness waived by Jonnie Hill with AOGCC. Test completed successfully. Pull test plug & set wear bushing. Break down and rig down test equipment. Rig up and test 13 ⅜" casing to 2500psi. Break down and rig down test equipment. Pick up and make up BHA #4. Gas: No gas was observed. 06/15/2014 Pick up BHA #4 as per SLB. Run in hole from 655' MD to 2534’ MD. Shallow hole test at 1500' MD. Wash and ream from 2534' MD to 2795' MD. Drill out float equipment, shoe track and 22' of new hole to 2905' MD. Displace to 9.25 ppg LSND, pump 45 barrels of high viscosity spacer, 410 barrels of LSND. Blow down top drive. Cut and slip drill line, inspect brakes. Circulate bottoms up for formation integrity test, recip. from 2814' MD to 2721' MD. Rig up and perform leak off test to 10.6ppg equivalent mud weight. Break circulation and wash and ream from 2814' MD to 2905' MD. Drill from 2905' MD to 3247' MD, 2815' TVD. Gas: The maximum gas was 52 units at 3268’ MD and the average gas was 23 units. Geology: Samples consisted of 100% clean sandstone. 06/16/2014 Continue to drill from 3268' MD to 4215' MD. 2815' TVD Gas: The maximum gas was 22 units at 3980’ MD and the average gas was 12 units. Geology: Samples consisted of 90% sandstone with 10% siltstone. 06/17/2014 Continue to drill 12.25 '' hole; TD intermediate section at 5207' MD. Circulating and back reaming out of hole. Gas: The maximum gas was 988 units at 4806’ MD and the average gas was 83 units Geology: Samples consisted of 100% clean well sorted sandstone 06/18/2014 Circulate bottoms up two times. Rack stands back from 5165' MD to 5056' MD. Back ream out of hole at 850 gpm, 1400 psi & 80 rpm to 2878' MD. At 4175' MD and 3217' MD, work through twice with no pump psi increase. At 3217' MD to 2878' MD; 4" to 5" clay returns observed and circulated bottoms up 4.5 times from 2878' MD to 2627' MD. Monitor well to be static for 10 minutes. Pull out of the hole to 2160’ MD. Pumped 25 barrels 11.4 lb/gal dry job. Laid down BHA #4. Gas: The maximum gas was 190 units. 06/19/2014 Float 9 ⅝" casing to 126' MD. Test floats successfully. Run in hole with casing from 126' MD to 5192' MD. Rig down Tesco equipment and rig up cement head. Fill casing at 3 bpm. Cement Job:105 bbls MudPush, 79.5 barrels 12.5 lb/gal lead cement and 51 barrels 15.8 lb/gal tail cement. Gas: The maximum gas was 172 units. 06/20/2014 Nipple down BOP. Set e-slips and cut 9⅝” casing. Nipple up BOP and test BOP. Test 9 ⅝” casing to 3000 psi for 30 minutes. Pick up BHA #5 Gas: The maximum gas was 0 units. 06/21/2014 Run in hole with BHA #5. Shallow hole test MWD tools. Continue to run in hole. Displace from LSND mud to FazePro mud. Drill out shoe and 20’ of new hole. Drill ahead to 6203’ MD. Gas: The maximum gas was 2341 units. Geology: Samples consisted of 100% clean sandstone 06/22/2014 Drill 8.75” hole from 6203’ MD to 8296’ MD Gas: The maximum gas was 2272 units. Geology: Samples consisted of 100% clean sandstone 06/23/2014 Continue to drill 8.75” hole from 8296’ MD to 10803’ MD. Gas: The maximum gas was 2651 units. Geology: Samples consisted of 100% clean sandstone 06/24/2014 Continuing to drill 8.75” hole from 10803’ MD to 12110’ MD. Gas: The maximum gas was 2964 units. Geology: Samples consisted of 100% clean sandstone 06/25/2014 Continue to drill 8.75” hole from 12110’ MD to 14306’ MD. Gas: The maximum gas was 3420 units. Geology: Samples consisted of 100% clean sandstone 06/26/2014 Continue to drill 8.75” hole from 14306’ MD to 15216’ MD. TD production section. Backream out of hole Gas: The maximum gas was 3166 units. Geology: Samples consisted of 100% clean sandstone 06/27/2014 Continue to backream out of hole Gas: The maximum gas was 17 units. 06/28/2014 Continue to backream out of hole. Lay down BHA #5. Rig up liner equipment and run in hole with 5 ½” liner Gas: The maximum gas was 7 units. 06/29/2014 Continue to run in the hole with 5 ½” liner. Pick up power tongs, make up seal assembly, and set slim pulse in collar. Make up one stand of 5” drill pipe. Shallow test MWD. Clean pump room. Run in hole with 5” drill pipe. Orient MWD and hanger. Tag bottom and pick up to 15205’ MD. Set hanger and test. Gas: The maximum gas was 8 units 06/30/2014 Unsting from top of liner. Pull out of hole 3 stands. Cut and slip drill line. Service rig. Pull out of hole and lay down running tool. Pick up Whipstock BHA #6 and run in hole to 4922’ MD. Orient Whipstock to 5064’ MD and set. Gas: The maximum gas was 12 units. 07/01/2014 Mill 8 ¾” window in 9 ⅝” casing from 4992’ MD to 5032’ MD. Pump sweep, monitor well and pump dry job. Pull out of hole and lay down BHA. Service rig. Pick up BHA #7 and run in hole. Perform formation integrity test to 13.0 ppg. Orient MWD and motor. Gas: The maximum gas was 18 units and the average gas was 14 units. 07/02/2014 Continue to drill from 5031’ MD to 5232’ MD. Circulate bottoms up three times and pull out of hole. Laydown BHA, rig up and test BOP. Pick up BHA #8 and run in hole. Gas: The maximum gas was 48 units and the average gas was 25 units. Geology: Samples consisted of 90% siltstone and 10% sandstone. 07/03/2014 Run in hole with BHA. Shallow hole test MWD, Ecoscope failure. Pull out of hole and change out Ecoscope. Run in hole and MAD Pass from 5030’ MD to 5232’ MD. Drill ahead to 7096’ MD. Gas: The maximum gas was 1954 units and the average gas was 629 units. Geology: Samples consisted of 100% clean sandstone. 07/04/2014 Drill ahead from 7096’ MD to 9745’ MD. Gas: The maximum gas was 2204 units and the average gas was 975 units. Geology: Samples consisted of 100% clean sandstone. 07/05/2014 Drill ahead from 9745’ MD to 12387’ MD. Gas: The maximum gas was 2756 units and the average gas was 1183 units. Geology: Samples consisted of 100% clean sandstone. 07/06/2014 Drill ahead from 12387’ MD to 13775’ MD. Gas: The maximum gas was 2246 units and the average gas was 1160 units. Geology: Samples consisted of 100% clean sandstone. 07/07/2014 Drill ahead from 14775’ MD to TD at 15245’ MD. Begin backreaming out of hole. Gas: The maximum gas was 2063 units and the average gas was 1554 units. Geology: Samples consisted of 100% clean sandstone. 07/08/2014 Backream out of hole from 9922’ MD to 5117’ MD. Work DS through tight spots and pack offs to 5462’ MD. Reduce RPM and continue backreaming out of hole, working BHA across whipstick slide. Gas: The maximum gas was 139 units and the average gas was 10 units. 07/09/2014 Backream out of hole from 4800’ MD to 3476’ MD. Circulate bottoms up twice. Pull out of hole from 3476’ MD to 957’ MD. Pull out of hole from 957’ MD to 397’ MD. Lay down BHA #9 and clean rig floor. Pick up HWDP and make up BHA #1B as per Baker Hughes. Trip in hole with BHA #1B from 490’ MD to 1421’ MD. Gas: The maximum gas was 137 units and the average gas was 9 units. 07/10/2014 Pull out of hole from 4940’ MD to 490’ MD. Laid down BHA #1B, no whipstock on hook. Make up BHA #1B. Trip in hole from 491’ MD to 1518’ MD. Shallow hole test MWD tools. Trip in hole from 4942’ MD to whipstock slide at 5002’ MD. Pull up and observe hook latch at 4996’ MD. Jar whipstock free. Slight static loss. Drop ball rod at 4941’ MD and pick up to 4911’ MD. Pull out of hole from 4942’ MD to 490’ MD. Gas: The maximum gas was 6 units and the average gas was 2 units. 07/11/2014 Lay down Whipstock Retrieval BHA and clean rig floor. Make up Baker cleanout BHA to 454' MD run in hole from 454' MD to 4937' MD washing down to 5051' MD observe top of liner hanger. Wash down to 5078' MD increasing flow rate. Wash up to 4990' MD. Circulate bottoms up @400 GPM. Pull out of hole from 4937' MD to 80' MD Laid Cleanout BHA As per Baker Rep. Clean BHA. Load Comp. Tools and MWD in Shed. Make up Diverter with hanger seal assembly. Stage up pumps to verify tool release. Test was Unsuccessful. Prepare well for well control and wait on replacement diverter. Gas: The maximum gas was 5 units and the average gas was 2 units. 07/12/2014 Make up BHA and run in the hole with seal assembly on 5" DP. From 150' MD to 4917' MD. With shallow hole test @ 1500' MD Was down from 4917' MD to 5086' MD Verify Anchor latch up. Release tool. Monitor well. Static; Pulled out of hole from 5086' MD to 65' MD. Loaded casing tools and make up liner shoe. Run in the hole with 5.5' Liner to 3292' MD. 80 Jts Run. 07/13/2014 Run in hole with 5.5" Liner from 3292' MD to 10176' MD Entry into SBD At 4985' MD with Window Exit at 5007' MD Pick up and make up ported crossover with Volant tool. Make up RAM liner Hanger. Make up Bumper sub and crossover. Run in hole to to 15093' MD. Break Circulation. Wash down to 15183' MD. Observe drop into Alignment slot. Drop Setting Ball. Picked up to Ensure Ram is Set. Top at 4981' MD. Shoe at 15200' MD. Displace 9.2+ OBM w/9.1+ Brine. Pulled out of hole on Elevators and laid down liner running tools. Serviced brake liner packer. 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 0 5 10 15 20 25 30 35 40 Me a s u r e d D e p t h Rig Days Prognosed Actual WELL NAME: SP12-SE3 & SP12-SE3 L1 OPERATOR: ENI Petroleum MUD CO: MI Swaco RIG: Doyon 15 SPERRY JOB: AK-XX-0901412968 Days vs. Depth 06 June 2014 Sperry SDL continue on location from previous well LOCATION: Spy Island AREA: North Slope Borough STATE: Alaska SPUD: 8-Jun-2014 TD: 7-Jul-2014 Commenced 16.0" Surface Hole Section On Bot: 01:40 8 Jun 2014 TD Surface Hole Section 2883' MD, 2465' TVD Off Bot: 22:00 9 Jun 2014 Landed 13.375" Casing 2878' MD, 2463' TVD 12 Jun 2014 Commenced 12.25" Intermediate Hole Section On Bot: 16:08 15 Jun 2014 TD Intermediate Hole Section 5207' MD, 3981' TVD Off Bot: 22:34 17 Jun 2014 Landed 9.625" Casing 5193' MD, 3980' TVD 19 Jun 2014 Commenced 8.75" Production Hole Section On Bot: 14:45 21 Jun 2014 TD Production Hole Section 15216' MD, 4063' TVD Off Bot: 13:10 26 June 2014 TD Production Hole Section 15245' MD, 4050' TVD Off Bot: 02:58 07 Jul 2014 POOH for Ecoscope MWD tool failure 03 Jul 2014 Drill 8.75" hole to 5232' MD POOH to test BOPs 02 Jul 2014 Commenced 8.75" L1 Production Hole Section On Bot: 07:10 01 Jul 2014 WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Surface EMPLOYEE NAME:DATE: Recommendations: Have a standard for swapping out computers. Innovations and/or cost savings: N/A Douglas Acker 19-Jun-2014 What went as, or better than, planned: Rigging up after the rig move went as well as planned Difficulties experienced: After changing out the Iris and 4th computer everything seemed to be working as it should until we tried to connect Wits to SLB. As usual we went through and double checked the screen shots to make sure everything was set up as it was before. After working on the issue for several hours I thought it might be a network issue. I double checked the settings and everything looked ok. I thought maybe there was a communication issue with the new computer since I used the same IP address as before. I changed them to a new IP address that was not in use and that solved the problem. SP12-SE3 Spy Island ENI Petroleum North Slope Borough AK-XX-0901412968 Alaska Surface Data Logging After Action Review WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Intermediate EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 AK-XX-0901412968 Alaska SP12-SE3 Spy Island ENI Petroleum North Slope Borough Danielle Dawson 21-Jun-2014 What went as, or better than, planned: During the section, all of the gas gear performed as required without any problems. Also, the networking problem with not being able to connect to SLB's WITSed data was resolved, and no further issues were encountered. Difficulties experienced: As experienced previously, Insite was having issues tracking depths. During connections, it was not switching in and out of slips correctly, so that after a connection had been made, the bit depth was off by one stand causing about 90 feet of lost gas data. Recommendations: The bit depth needs to be manually corrected after each correction to reflect the actual depth. Innovations and/or cost savings: N/A Surface Data Logging After Action Review Surface Data Logging WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Recommendations: The network issue with Insite should be resolved ASAP so we can get back to using Insite as we normally do. Make sure all crew members check pump configurations before starting each well to avoid having wrong liner ID's, etc. It is important for trainees to beaware of the bit depth while making a connection to avoid having to make depth corrections. Also make sure to keep an eye on the chromatograph while drilling to make sure it does not stop cycling while drilling. Innovations and/or cost savings: N/A Leigh Ann Rasher 26-Jun-2014 What went as, or better than, planned: No major issues were experienced with gas equipment. Difficulties experienced: Insite software ran super slow on all computers except the ADI. We had to use the ADI for most Insite operations (adding comments, data statistics, etc) due to this problem. WITs froze several times a day while drilling and had to be completely shut down and restarted. We think the WITs issue has to do with the Insite issues. Pump 3 configuration had to be corrected due to lag being off when using pump 3. The bit tracker unnoticably got stuck in slips a few times during connections causing depth corrections to be made. The chromatograph also stopped cycling by itself and had to be restarted once or twice while drilling. SP12-SE3 Spy Island ENI Petroleum North Slope Borough AK-XX-0901412968 Alaska Surface Data Logging After Action Review Surface Data Logging WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:Doyon 15 HOLE SECTION:Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Recommendations: Continue to monitor going in and out of slips and adjust when needed. Innovations and/or cost savings: Near the end of the well the block weight, the hookload threshold and the block speed was changed allowing Insite to track slips, and therefore depth, much better than before. 7-Jul-2014 What went as, or better than, planned: Sample collection went well with no problems. Regular maintenance and properly installed equipment did not result in condensation causing issues with the gas gear. Filters were changed on the shaky panel and have been filtering out more water from the lines. Did not experience the networking problems encountered previously with the SLB MWD data. Difficulties experienced: Chromatograph lost connection with computer from 12,331-12,368'. Insite was having difficulty tracking depth and going in and out of slips at inapproriate time, necessitating manual bit depth corrections. Also, an Insite problem causing block height trace and pit trace display issues on the time log has occurred. Megan Cardenas, Danielle Dawson SP12-SE3 L1 Spy Island ENI Petroleum North Slope Borough AK-XX-0901412968 Alaska Surface Data Logging After Action Review Surface Data Logging WELL NAME:SP12-SE3 & SP12-SE3 L1 LOCATION:Spy Island OPERATOR:ENI Petroleum AREA:North Slope Borough MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:8-Jun-2014 SPERRY JOB:AK-XX-0901412968 TD:7-Jul-2014 Marker MD INC AZ TVD TVDSS 16" Surface Borehole SV-4 777.0 18.6 318.6 767.9 -714.0 SV-3 1,172.0 33.7 321.0 1,118.9 -1,065.0 SV-2 1,503.0 41.8 317.6 1,378.8 -1,324.9 Permafrost Base 2,038.0 42.0 315.4 1,768.9 -1,715.0 SV-1 2,263.0 43.4 328.5 1,936.1 -1,882.2 Ugnu Top (UG4)2,658.0 25.7 332.7 2,258.2 -2,204.3 12 1/4" Intermediate Borehole UG-2 Coal Bed Marker 3,225.0 19.2 50.2 2,793.8 -2,739.9 Lower Ugnu 4,072.0 46.4 98.4 3,500.4 -3,446.5 Schrader Bluff 4,556.0 61.7 105.0 3,773.0 -3,719.1 N Sequence Top 4,623.0 62.4 105.9 3,804.5 -3,750.6 N Sand Top 4,711.0 64.2 108.3 3,844.1 -3,790.2 N-2 Top 4,746.0 65.1 109.1 3,859.2 -3,805.3 N-3 Top 4,762.0 65.5 109.5 3,865.9 -3,812.0 N Sand Bottom 4,855.0 68.7 112.2 3,902.1 -3,848.2 N Sequence Base 5,029.0 77.0 117.2 3,951.5 -3,897.6 8 3/4" Lateral Leg OA Sand Top 5,519.0 76.8 116.9 4,014.3 -3,960.4 OA-2 5,600.0 86.0 128.3 4,020.2 -3,966.3 OA-3 5,689.0 86.2 129.1 4,026.2 -3,972.3 OA-3 6,543.0 92.0 124.0 4,039.8 -3,958.9 OA-2 6,643.0 91.2 123.5 4,037.0 -3,983.1 OA-2 7,858.0 87.2 124.9 4,060.0 -4,006.5 OA-3 7,961.0 86.1 125.1 4,066.4 -4,012.5 OA-3 9,547.0 91.4 125.0 4,074.3 -4,020.4 OA-2 9,605.0 90.8 125.5 4,073.1 -4,019.2 OA-2 10,875.0 88.5 125.4 4,069.5 -4,015.6 OA-3 11,018.0 88.2 125.3 4,074.0 -4,020.1 OA-3 12,382.0 91.9 125.5 4,070.9 -4,017.0 OA-2 12,498.0 91.4 125.6 4,067.6 -4,013.7 OA-2 13,856.0 89.1 124.7 4,054.9 -4,001.0 OA-3 14,046.0 87.2 124.5 4,061.4 -4,007.5 8 3/4" L1 Lateral Leg OA-Sand Top 5,710.0 86.2 117.3 4,023.1 -3,969.2 OA-2 6,546.0 86.6 128.1 4,040.7 -3,986.8 OA-3 6,670.0 87.0 127.9 4,047.9 -3,994.0 OA-3 8,022.0 90.6 124.7 4,069.9 -4,016.0 OA-2 8,193.0 91.1 123.2 4,068.2 -4,014.2 OA-2 9,405.0 89.0 127.3 4,076.5 -4,022.6 OA-3 9,652.0 87.2 126.1 4,079.6 -4,025.7 OA-3 10,966.0 92.9 126.8 4,078.9 -4,025.0 OA-2 11,042.0 92.5 126.5 4,075.3 -4,021.4 OA-2 12,295.0 87.5 124.8 4,070.1 -4,016.2 OA-3 12,406.0 86.9 123.9 4,075.8 -4,021.9 OA-3 13,975.0 92.6 123.7 4,067.5 -4,013.6 OA-2 14,237.0 91.4 123.4 4,059.8 -4,005.8 TD 8 3/4" L1 lateral 15,245.0 90.0 124.9 4,049.8 -3,995.8 Formation Tops Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: No Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Show Report Report # 1 SP12-SE3 5655 7090 Spy Island 4024 4041 ENI Petroleum Kori Jo Plowman OA Sands Andrew Buchanan 6/27/2014 Interpretation: This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to very fine grain, subangulat to subrounded, well sorted, quartz sand. There is no free oil in the sample, trace dull yellow to white sample flourescence, streaming or blooming dull yellow cut fluorescence, clear cut, a light amount of clear residual ring, and dull yellow to white residual flourescence ring. Cuttings Analysis: Odor none Fluorescence Cut Fluorescence Residual Cut clr Color Intensity dull Color yel Residual Flourescence none-fnt Amount none Distribution pchy Intensity dull Color Stain Amount tr Type stmg-bloom Amount yel-wh Oil Show Rating Free Oil in Mud dull Color clr Color Cut Color yel-wh Intensity 214865 6259 208606 1003 1 Hydrocarbon Ratios 5655 Gas Units 1937 Mud Chlorides (mg/L) =80000 142 16 126 4346 222 14 208 2065 110 9 101 1656 51 3 48 2 6044 Gas Units 2227 Mud Chlorides (mg/L) =78000 252437 7911 244526 867 307 25 282 1430 Hydrocarbon Ratios 188 17 171 944 293 34 259 2374 76000 256058 9582 246476 742 116 13 103 3 394 62 332 1018 298 56 242 698 6405 Gas Units 2272 Mud Chlorides (mg/L) = 4 7090 Gas Units 2035 Mud Chlorides (mg/L) = 494 141 353 1408 202 27 175 78000 219185 2011 217174 674 322 0 322 905 188 8 180 247 7 240 553 412 19 393 1207 Oil Gas NPH NPH NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: No Depth ft C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Leigh Ann Rasher OA Sands Andrew Buchanan 6/23/2014 Interpretation: This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform dull yellow sample flourescence, a dull yellow streaming flourescence cut, straw to light amber cut, a light amount of pale straw to light amber residual ring, and dull yellow residual fluorescence ring. Show Report Report # 2 SP12-SE3 7700 8900 Spy Island 4055 4074 ENI Petroleum 1 Hydrocarbon Ratios 7724 Gas Units 2093 Mud Chlorides (mg/L) =76000 Amount 100% even dull yel Distribution 2 436 82 354 1649 305 30 275 984 252 29 223 620 264394 7656 256738 800 348 27 321 1131 8674 Gas Units 2424 Mud Chlorides (mg/L) =72000 234 104 130 Hydrocarbon Ratios 270 57 133 233722 14341 219381 798 4 8837 Gas Units 2651 Mud Chlorides (mg/L) =72000 1366 221 33 188 261 34 227 711 3 213 664 490 150 340 1737 287726 9308 278418 884 467 106 361 237308 11516 225792 875 313 55 258 1060 8131 Gas Units 2144 Mud Chlorides (mg/L) =75000 203 70 Residual Cut strmg dull yel Fluorescence 0.00 Cuttings Analysis: 533 136 397 1961 251 109 142 358 43 315 1136 293 48 245 701 Color Free Oil in Mud Intensity Color none none straw-lt amb Cut Fluorescence Oil Show Rating wh Intensity Color Odor Stain Color Amount Cut Color ltAmount ambColor Residual Flourescence dull Type Intensity 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: No Depth ft C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1. Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft . Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Leigh Ann Rasher OA Sands Andrew Buchanan 6/23/2014 Interpretation: This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform dull yellow sample flourescence, a dull yellow streaming flourescence cut, pale straw to light amber cut, a light amount of amber residual ring, and dull white residual fluorescence ring. Show Report Report # 3 SP12-SE3 9100 10900 Spy Island 4079 4069 ENI Petroleum 1 Hydrocarbon Ratios 9119 Gas Units 2296 Mud Chlorides (mg/L) =70000 Amount 100% even dull yel Distribution 2 508 222 286 2399 312 70 242 1270 263 76 187 830 271389 18612 252777 1114 286 59 227 1470 10240 Gas Units 2410 Mud Chlorides (mg/L) =66000 278 145 133 Hydrocarbon Ratios 273 53 99 250863 13376 237487 981 4 10852 Gas Units 2306 Mud Chlorides (mg/L) =62000 1337 235 46 189 229 57 172 926 3 220 754 532 181 351 1990 256553 12481 244072 1135 445 172 273 276379 11653 264726 932 327 43 284 1203 9403 Gas Units 2558 Mud Chlorides (mg/L) =70000 255 156 Residual Cut strmg dull yel Fluorescence 0.00 Cuttings Analysis: 306 115 191 3487 173 103 70 255 40 215 2068 152 34 118 1278 Color Free Oil in Mud Intensity Color none none pl straw Cut Fluorescence Oil Show Rating wh Intensity Color Odor Stain Color Amount Cut Color ltAmount ambColor Residual Flourescence dull Type Intensity 1 10 100 1000 Oil Gas NPH NPH 1.0 10.0 100.0 1000.0 NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: No Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Show Report Report # 4 SP12-SE3 L1 5232'7200' Spy Island 3962'3760' ENI Petroleum Danielle Dawson OA Sands Andrew Buchanan 7/8/2014 Interpretation: This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform dull yellow sample flourescence, a dull yellow streaming flourescence cut, pale straw cut, a light amount of amber residual ring, and dull to bright white residual fluorescence ring. Cuttings Analysis: Odor fnt Fluorescence Cut Fluorescence Residual Cut med-lt straw Color brn Intensity dul Color yel Residual Flourescence none-fnt Amount tr Distribution uni Intensity dul Color Stain Amount 30%Type stmg Amount yel Oil Show Rating Free Oil in Mud bri Color pl straw Color Cut Color yel Intensity 167515 23817 143698 604 1 Hydrocarbon Ratios 6311 Gas Units 1426 Mud Chlorides (mg/L) =69000 315 112 203 2024 311 73 238 1005 197 54 143 708 125 54 71 2 6747 Gas Units 1705 Mud Chlorides (mg/L) =69000 196075 65079 130996 609 308 93 215 757 Hydrocarbon Ratios 250 77 173 487 429 160 269 1394 69000 222128 3752 218376 581 179 85 94 3 376 0 376 786 296 18 278 469 6886 Gas Units 1954 Mud Chlorides (mg/L) = 4 6970 Gas Units 1923 Mud Chlorides (mg/L) = 509 43 466 1050 214 6 208 69000 217376 223 217153 646 336 0 336 698 239 0 239 311 0 311 398 554 8 546 909 Oil Gas NPH NPH NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Yes Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 240 138 102 234 64 170 602 466 183 283 1671 69000 198463 28039 170424 782 279 61 218 1002 4 8933 Gas Units 1768 Mud Chlorides (mg/L) = 432 140 292 722 225 43 182 222 32 190 773 211 41 170 450 7960 Gas Units 1628 Mud Chlorides (mg/L) =69000 139349 7996 131353 691 302 225 77 3 Hydrocarbon Ratios 331 211 120 520 636 432 204 1378 69000 245422 139349 106073 676 379 222 157 884 298 146 152 2 7997 Gas Units 2204 Mud Chlorides (mg/L) = 625 234 391 1249 350 96 254 805 334 98 236 486 242308 52411 189897 748 1 Hydrocarbon Ratios 8001 Gas Units 1717 Mud Chlorides (mg/L) =69000 yel Oil Show Rating Free Oil in Mud dul Color pl-med straw Color Cut Color yel-wh Intensity pl straw Color Intensity br Color yel Residual Flourescence none-fnt Amount none Distribution uni Intensity dull Color Stain Amount abd Type stmg Amount Cuttings Analysis: Odor fnt Fluorescence Cut Fluorescence Residual Cut Andrew Buchanan 7/8/2014 Interpretation: This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform bright yellow or white sample flourescence, a dull yellow streaming flourescence cut, pale to medium straw cut, a clearr residual ring, and dull white residual fluorescence ring. Show Report Report # 5 SP12-SE3 L1 7200'9200' Spy Island 3760'3554' ENI Petroleum Danielle Dawson OA Sands Oil Gas NPH NPH NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: No Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Show Report Report # 6 SP12-SE3 L1 9200'11200' North Slope 3554'3347' ENI Petroleum Danielle Dawson OA Sands Andrew Buchanan 7/8/2014 Interpretation: This interval displays a good oil show, but is not associated with any heavy hydrocarbon gases. It is dominated by unconsolidated, fine to very fine grain, subrounded to subangular, well sorted, quartz sand. It is slightly silty in part. There is free oil in the sample with a very faint oil odor, uniform dull orange sample flourescence, an immediate bright blue bursting to streaming flourescence cut, bright greenish yellow residual ring flourescence, and no visible residual ring. Cuttings Analysis: Odor none Fluorescence Cut Fluorescence Residual Cut pl-med straw Color Intensity fnt-dul Color yel Residual Flourescence fnt Amount none Distribution patchy Intensity dull Color Stain Amount 10%Type stmg Amount wh Oil Show Rating Free Oil in Mud bri Color pl straw Color Cut Color yel Intensity 213932 4382 209550 754 1 Hydrocarbon Ratios 9694 Gas Units 1913 Mud Chlorides (mg/L) =60500 426 120 306 1776 304 26 278 1121 218 31 187 685 230 112 118 2 10434 Gas Units 2230 Mud Chlorides (mg/L) =6900 248031 75700 172331 1084 290 131 159 1706 Hydrocarbon Ratios 193 92 101 1026 392 224 168 2825 6900 264850 33160 231690 772 208 147 61 3 353 53 300 1466 201 43 158 788 10623 Gas Units 2434 Mud Chlorides (mg/L) = 4 11195 Gas Units 2192 Mud Chlorides (mg/L) = 418 124 294 1207 225 33 192 6900 241287 46190 195097 916 303 90 213 1790 177 110 67 163 54 109 1043 330 143 187 2912 Oil Gas NPH NPH NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: No Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 153 66 87 137 29 108 962 303 89 214 2367 69000 244601 38696 205905 710 345 55 290 1907 4 12800 Gas Units 2203 Mud Chlorides (mg/L) = 382 0 382 1576 191 0 191 355 0 355 1645 183 0 183 788 11868 Gas Units 2756 Mud Chlorides (mg/L) =72000 301060 70 300990 848 188 30 158 3 Hydrocarbon Ratios 172 7 165 767 354 26 328 1591 72000 256739 5301 251438 892 282 0 282 1524 176 20 156 2 11405 Gas Units 2337 Mud Chlorides (mg/L) = 325 15 310 1554 283 0 283 1637 152 4 148 782 243820 1474 242346 856 1 Hydrocarbon Ratios 11311 Gas Units 2214 Mud Chlorides (mg/L) =72000 wh Oil Show Rating Free Oil in Mud bri Color pl straw Color Cut Color yel Intensity light straw Color brn Intensity dul Color straw Residual Flourescence none-fnt Amount tr Distribution uni Intensity dull Color Stain Amount tr Type stmg Amount Cuttings Analysis: Odor fnt Fluorescence Cut Fluorescence Residual Cut Andrew Buchanan 7/8/2014 Interpretation: This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform dull yellow sample flourescence, a dull yellow streaming flourescence cut, pale straw to light amber cut, a light amount of amber residual ring, and dull to bright white residual fluorescence ring. Show Report Report # 7 SP12-SE3 L1 11200'13200' Spy Island 3347 3141 ENI Petroleum Danielle Dawson OA Sands Oil Gas NPH NPH NPH Oil Gas NPH 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH SP12-SE3 & SP12-SE3 L1 ENI Petroleum MI Swaco Doyon 15 AK-XX-0901412968 Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++ 7-Jun 160 8.70 150 35 52 20/36/50 6.3 122/87/71/49/19/15 2/-2.0 0/98 AREA:0.20 9.9 20.0 .15/.30 1200 72 Lubricate Rig 8-Jun 600 9.10 113 29 35 28/45/56 5.8 93/64/53/39/18/16 2/-3.0 1/96 0.10 0.20 9.5 21.0 .10/.25 1650 64 Drilling 16" Hole 9-Jun 2800 9.40 93 23 38 25/48/61 5.4 84/61/50/38/19/17 2/-4.0 1/95 0.15 0.25 10.4 22.0 .15/.50 1850 64 BROOH 10-Jun 2883 9.40 64 23 25 19/35/48 5.4 71/48/39/28/16/14 2/-4.0 1/95 0.15 0.20 95.0 20.0 .05/.35 1650 72 POOH w/Casing 11-Jun 2883 9.50 75 65 33 20/41/53 5.4 89/61/49/36/17/15 2/-5.0 1/94 0.15 0.20 9.3 20.0 .05/.35 1500 40 Clean out run 12-Jun 2883 9.40 44 19 15 7/8/8 -53/34/27/20/8/7 ----------Cement Casing 13-Jun 2883 9.40 44 20 13 7/8/8 ------------BOPs Test - P/U Drill pipe 14-Jun 2883 9.40 46 20 14 7/8/8 ------------BOP Test / Picking up BHA #4 15-Jun 3161 9.30 47 11 25 13/16/18 5.9 47/36/31/25/13/11 2/-4.0 2/94 -0.30 0.30 9.7 2.0 .15/1.00 800 52 Drilling 12.25'' Hole 16-Jun 4140 9.30 55 16 31 14/22/27 5.1 63/47/40/31/14/12 2/-4.5 2/94 0.15 0.30 9.6 11.0 .15/1.10 1300 56 Continue Drilling 12.25" Hole 17-Jun 5147 9.30 55 15 29 13/26/34 4.4 59/44/38/30/14/12 2/-4.9 2.75/92.3 0.10 0.20 9.7 14.5 .10/1.10 1600 64 Drilled to Intermediate TD 18-Jun 5207 9.35 59 14 27 16/28/36 4.8 55/41/35/28/13/11 2/-5.0 2.5/92.5 0.10 0.20 9.8 16.0 .10/1.00 1500 60 R/U Tesco Tools 19-Jun 5207 9.40 48 9 16 8/16/28 4.6 34/25/22/17/8/6 2/-5.0 0.0 0.10 0.15 9.0 15.0 .10/1.80 15000 60 RIH w/ casing & pump cement 20-Jun 5207 9.40 50 9 16 8/16/28 4.6 34/25/22/17/8/6 1/-5.0 2.5/92.5 0.10 0.15 9.0 15.0 .10/.80 1500 60 RIH BHA #5 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG 21-Jun 5768 9.25 46 14 19 8/8/9 4.6 47/33/28/22/8/7 NA/2 6.81 67/33 2.65 3.45 673 28.92 -0.8/6.1 2.8 Drilling 8.75" hole 22-Jun 8024 9.2 41 12 12 7/7/8 4.6 38/26/21/16/7/6 NA/2 7.17 69/31 2.4 3.12 620 29.35 -0.9/6.3 2.8 Drilling 8.75" hole 23-Jun 10565 9.2 43 12 17 8/8/8 4.6 41/29/24/18/8/7 NA/2 7.64 70/30 2.9 3.77 612 36.17 -0.9/6.7 2.8 Drilling 8.75" hole 24-Jun 12062 9.2 42 12 15 7/7/8 4.6 39/27/23/18/8/7 NA/1 8.08 69/31 3.1 4.03 644 32.88 -1.1/7 2.8 Drilling 8.75" hole 25-Jun 14215 9.2 46 12 17 7/7/8 4.4 41/29/23/18/8/7 NA/1 8.29 71/29 3 3.9 640 30.69 -1.5/6.8 2.8 Drilling 8.75" hole 26-Jun 15216 9.2 43 12 18 7/78 4.6 42/30/25/19/8/7 NA/1 8.15 71/29 2.9 3.77 647 26.21 -13.18/65.62 2.8 BROOH 27-Jun 15216 9.2 41 12 13 7/7/7 -37/25/20/16/7/6 NA/-8.28 72/28 2.6 3.38 690 25.58 -12.97/67.15 2.8 BROOH 28-Jun 15216 9.2 40 12 13 7/7/7 -37/25/20/16/7/6 NA/-8.28 72/28 2.6 3.38 670 25.58 -12.97/67.15 2.8 RIH 5.5" Liner 29-Jun 15216 9.2 40 11 12 6/7/7 -34/23/17/13/7/6 NA/-7.99 71/29 2 2.6 665 26.84 -9.43/68.15 2.8 Test backside 30-Jun 15216 9.2 40 11 12 6/7/7 -34/23/17/13/7/6 NA/-7.99 71/29 2.3 2.99 660 26.51 -9.99/68.01 2.8 Orient Whipstock 1-Jul 5032 9.2 41 11 12 6/7/7 4.6 34/23/17/13/7/6 NA/1 7.99 71/29 2.35 3.06 661 26.51 -9.99/68.01 2.8 Orient MWD/Motor 2-Jul 5232 9.2 42 10 14 6/7/7 4.5 34/24/18/14/7/6 NA/2 7.99 71/29 2.00 2.6 650 26.75 -27.78/49.58 3 M/U BHA 3-Jul 6619 9.25 44 14 14 8/8/9 4.2 42/28/23/18/8/7 NA/2 9.54 73/27 2.20 2.86 712 28.29 -79.85/7.46 2.6 Drilling 8.75" hole 4-Jul 9548 9.25 44 12 17 7/8/8 4.2 41/29/24/18/8/7 NA/2 9.1 72/28 2.10 2.73 677 29.8 -44.87/36.48 3 Drilling 8.75" hole 5-Jul 12208 9.30 44 12 18 8/8/9 4.0 42/30/24/18/8/7 NA/2 8.5 71/29 2.30 2.99 746 30.7 -47.37/32.33 3 Drilling 8.75" hole 6-Jul 14684 9.30 44 11 20 8/8/9 4.0 42/31/24/18/8/7 NA/1 9.1 73/27 2.10 2.73 743 31.0 -51.75/33.64 3 DrIlling 8.75" hole 7-Jul 15245 9.30 44 12 19 8/8/9 4.0 42/31/24/18/8/7 NA/2 8.7 72/28 2.60 2.89 789 30.0 -45.45/25.65 3 Reach TD 15245' 8-Jul 15245 9.30 43 12 16 8/9/9 4.1 40/28/24/18/8/7 1/32"8.7 70/30 2.60 3.38 902 31.9 -31.95/42.74 2.6 BROOH 9-Jul 15245 9.30 43 11 17 8/8/9 3.1 39/28/22/17/8/7 1/32"8.6 73/27 2.40 3.12 874 34.3 -77.88/0.05 2.6 Retrieve Whipstock 10-Jul 15245 9.25 43 11 16 8/8/9 3.8 38/27/22/17/8/7 1/32"8.7 73/27 2.30 2.99 847 33.7 -78.77/0.09 2.6 Retrieve/Fish for Whipstock 11-Jul 15245 9.25 43 11 18 8/8/8 -40/29/23/17/8/7 -8.1 73/28 2.30 2.99 780 33.5 -73.98/0 2.6 L/D Cleanout BHA 12-Jul 15245 9.25 43 12 15 8/8/9 -39/27/22/18/8/7 -8.2 72/28 2.20 2.60 772 33.3 -74.45/0 2.6 RIH 5.5" Liner Casing Record 20" Conductor @ 160' MD, 160'TVD 13.375" Casing @ 2878' MD, 2463'TVD 9.625" Casing @ 5193' MD, 3979'TVD 9.625 Casing Window@ TOW: 4992' MD, 3943'TVD; BOW: 5009' MD, 3947' TVD WELL NAME:LOCATION:Spy Island OPERATOR:AREA:North Slope Borough MUD CO:STATE:Alaska RIG:SPUD:8-Jun-2014 SPERRY JOB:TD:7-Jul-2014 Remarks W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 2 100 1 Hughes Milltooth MX-1 16.00 160 2883 2723 17.60 1.117 155.1 20 40 1700 800 1-1-WT-A-E-I-NO-TD Surface TD 3 200 1RR Smith GF15B Insert 12.25 2883 2883 0 13.00 1.117 -----2-7-BT-G-E-5-WT-BHA Cleanout 4 300 2 Smith GF15B Insert 12.25 2883 5207 2324 34.30 1.117 67.8 25 40 1350 750 1-3-BT-G-E-1-WT-TD Intermediate TD 5 400 3 Hycalog SKH616M-E1D PDC 8.75 5207 15216 10009 82.30 0.902 121.7 15 160 2450 550 1-1-CT-A-X-IN-NO-TD Production TD 6 500 4 Baker 8.5" OD Window Mill 8.75 4992 5032 40 --------Mill Window 7 600 4RR Smith XR+CPS Milltooth 8.75 5032 5232 200 2.60 0.746 77.8 18 40 1400 450 1-1-WT-A-E-1-No-BHA Kick off whipstock 8 700 5 Hycalog SKH616M-E1D PDC 8.75 5232 ----------Production section, Ecoscope failure 9 700 5RR Hycalog SKH616M-E1D PDC 8.75 5232 15245 10013 157.5 0.902 179.1 15 160 2600 550 1-2-BT-A-X-In-CT-TD Production TD WELL NAME:SP12-SE3 & SP12-SE3 L1 LOCATION:Spy Island OPERATOR:ENI Petroleum AREA:North Slope Borough MUD CO: SPERRY JOB:AK-XX-0901412968 TD:7-Jul-2014 MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:8-Jun-2014 B i t R e c o r d . . * 24 hr Recap:Waiting power to finish rigging up Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 0 6-Jun-2014 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 1 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: ConditionBit #Size 2731' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Hydril 563 Type 120' Depth in / out YP (lb/100ft2) 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Rig Move/Rig up PV Footage B. Perry/R. Wimmer ShClyst TuffGvlCoal cP 40.0 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 120' 120' 0' Max @ ft Current Date: Time: No gas to report over the last 24 hours. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth L-80 Oil / Water Alkal 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Jane Grundin / Doug Acker Set AtSize 178.9 X-65 Grade L-804949' 20.00'' 9.625" (max)(current) BTC 0 0 Cly 0 . . * 24 hr Recap:N/U diverter stack and test. N/U diverter and test. R/U secondary kill line, kill SI11 w/200bbls 9.6ppg brine, perfrom Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 20.00 0 7-Jun-2014 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 2 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: ConditionBit # 2.08.708.70 Size HWDP/Jars/NMFDC and rack back. Load rig floor w/BHA tools. 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB EVEMAR Avg Min Comments Mud RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Type Spud Mud 6.3120'52 Depth in / out YP (lb/100ft2) 0.20 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Rig Move/Rig up PV Footage B. Perry/R. Wimmer ShClyst TuffGvlCoal cP 35 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 120' 120' 0' Max @ ft Current Date: Time: No gas to report over the last 24 hours. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth /98150 Oil / Water Alkal 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Jane Grundin / Doug Acker Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 4024 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Jane Grundin / Doug Acker 985 0 654 132 Units* Casing Summary Lithology (%) 0 Oil / Water 1059' Alkal 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth /98150 C-5n 1023' 63.0 C-2 37 in 1 130'Minimum Depth Time: 9 The maximum gas was 37 units at 1023’ MD and the average gas was 9 units. 120' 1059' 939' Max @ ft Current 930'265.0 Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 278.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Perry/R. Wimmer ShClyst TuffGvlCoal cP 35 Footage Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling ahead PV 24 hr Max Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 0.20 000 Spud Mud 6.3120'52 Depth in / out Mud Type Lst Type Average 16Background (max) Trip 9.609.80 Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 160' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 f/160' t/360' Drill f/360' t/392', Pump out of hole, M/U remaining BHA #2, wash down t/392'. Drill f/392' t/1059'. 160' ConditionBit # 1 2.0 16 8.70 Hughes MX-1 Mill Tooth 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.90 DOYON15 Report For: Morning Report Report # 3 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 8-Jun-2014 12:00 AM Current Pump & Flow Data: 901 Max 0 Lime (lb/bbl) 20.00 Install skirt around stack, prep handling equip for BHA. P/U BHA #1. Pre spud meeting, flood conductor, test surface Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drilled from 1059' to 2883', Monitor well (static), BROOH f/2883' t/2783' @850gpm. Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 22.00 0 9-Jun-2014 12:00 AM Current Pump & Flow Data: 1576 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 4 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.00 DOYON15 Report For: ConditionBit # 1 4.0 16 9.50 Hughes MX-1 Mill Tooth 9.40 Size The maximum gas was 752 units at 1962’ MD and the average gas was 119 units. 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 160' WOB EVEMAR 9.809.90 Avg Min Comments Mud RPM ECD (ppg) ml/30min 23Background (max) Trip Average Mud Type Lst Type Spud Mud 5.4120'38 Depth in / out YP (lb/100ft2) 0.25 000 00 CementCht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling ahead PV Footage B. Perry/R. Wimmer ShClyst TuffGvlCoal cP 23 Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 348.0 Flow In (gpm) Flow In (spm) 1059' 2883' 1824' Max @ ft Current 2480'177.0 Date: Time: 119 in 4 1059'Minimum Depth C-5n 1962' 0.0 C-2 752 SPP (psi) Gallons/stroke TFABit Type Depth 1/9593 Oil / Water 2883' Alkal 1.117 0 0 0 Siltst 852 172 Units* Casing Summary Lithology (%) 011895 403 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Jane Grundin / Doug Acker Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 73133 . . * 24 hr Recap: (max)(current) 0 0 Cly 79505 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Jane Grundin / Doug Acker 5168 0 Units* Casing Summary Lithology (%) 0 Oil / Water 2883' Alkal 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1/9564 C-5n 1952' C-2 798 in Minimum Depth Time: 52 The maximum wiper gas 798 units 2883' 2883' 0' Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Perry/O. Amend ShClyst TuffGvlCoal cP 23 2723' Footage 17.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Pulling Casing PV 24 hr Max W eight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 0.20 000 40 Spud Mud 5.4120'25 Depth in / out Mud Type Lst Type Average 79823Background (max) Trip 9.809.90 Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 20160' 2883' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 650psi w/no returns (shoe plugged). Attempt to free @3000psi, no returns. Rotate out of hole f/1760' t/1485' observed slack off weight fall f/140k t/90-100k. Pull back t/1760', would not go past 1780'. Attempt to break circ, pressure up to 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 4.0 16 9.40 Hughes MX-1 Mill Tooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.00 DOYON15 Report For: Morning Report Report # 5 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 10-Jun-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides (mg/L) 1650 BROOH as per K&M f/2783' t/406'. POOH f/406' t/123', stand back 2 std HWDP & NMFC, B/D Top drive. L/D BHA #2 Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) 0 0 Cly 13548 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Jane Grundin / Doug Acker 864 0 Units* Casing Summary Lithology (%) 0 Oil / Water 2883' Alkal 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1/9575 C-5n 2883' C-2 133 in Minimum Depth Time: 8 The maximum Trip Gas 133 units 2883' 2883' 0' Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Perry/O. Amend ShClyst TuffGvlCoal cP 28 2723' Footage 17.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Clean out run PV 24 hr Max W eight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 0.20 000 40 Spud Mud 5.4120'33 Depth in / out Mud Type Lst Type Average 1335Background (max) Trip 9.809.90 Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 20160' 2883' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 as per K&M cycle, P/U & M/U BHA #3 t/576'MD. TIH f/576' t/2817'MD. @2817' break circ, wash down and tag btm @2883'. BROOH f/2883' t/1275' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.0 16 9.50 Hughes MX-1 Mill Tooth 9.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.00 DOYON15 Report For: Morning Report Report # 6 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 11-Jun-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides (mg/L) 1500 POOH f/1485' t/82' w/13-3/8" casing, L/D in pipe shed. Drain shoe track and cut all connections, L/D same. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:BROOH as per K&M f/1276' t/297'. L/D BHA #3 . B/D Top Drive, clean/clear rig floor. R/U t/run CSG as per GBR. RIH Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides (mg/L) 0 12-Jun-2014 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 7 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.00 DOYON15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 16Hughes MX-1 Mill Tooth 9.40 Size returns. B/D, R/D all equip, R/D csg equip pump 103bbls mud push, 469bbls lead slurry, 65bbls tail slurry, chase with Spud mud, bump plug @405bbls, 75bbls cement jt/hanger, land @2877'. Circ. & condition mud for cementing, weight up mud push. Pump cement as per plan, PT cement line, 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 20160' 2883' WOB EVEMAR 9.809.90 Avg Min Comments Mud RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Type 40 Spud Mud120'15 Depth in / out YP (lb/100ft2) 000 00 CementCht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Clean pits PV 2723' Footage 17.60 B. Perry/O. Amend ShClyst TuffGvlCoal cP 19 Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2883' 2883' 0' Max @ ft Current Date: Time: No Gas was Observed over the last 24 hrs in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 44 Oil / Water 2883' Alkal 1.117 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Kori Jo Plowman / Doug Acker Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Kori Jo Plowman / Doug Acker 0 0 Units* Casing Summary Lithology (%) 0 Oil / Water 2883' Alkal 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 44 C-5nC-2 No Gas was Observed over the last 24 hrs in Minimum Depth Time: 2883' 2883' 0' Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Perry/O. Amend ShClyst TuffGvlCoal cP 20 2723' Footage 17.60 Ss Ratio C-1 C-5i AK-AM-0901412968 P/U Pipe PV 24 hr Max W eight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 000 40 Spud Mud120'13 Depth in / out Mud Type Lst Type Average Background (max) Trip Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 20160' 2883' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 load/process 5" drill pipe in shed. Lubricate rig. Cont. to load/process 5" drill pipe. M/U stands and rack back. 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 16Hughes MX-1 Mill Tooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 8 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 13-Jun-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides (mg/L) N/D surface stack. N/U BOPE, prep surface hanger, N/U wellhead test connections t/2000psi, N/U hi-psi riser. N/U Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:M/U stands of 5" DP and rack back in derrick, 408jts picked up. R/U begin testing BOPE. C/O upper seals on pipe Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides (mg/L) 0 14-Jun-2014 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 9 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 16Hughes MX-1 Mill Tooth 9.40 Size No Gas was Observed over the last 24 hrs wear bushing. B/D & R/D test equip. R/U & test 13-3/8" casing t/2500psi, R/D test equip. P/U & M/U BHA #4. 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 20160' 2883' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Type 40 Spud Mud120'14 Depth in / out YP (lb/100ft2) 000 00 CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 P/U BHA #4 PV 2723' Footage 17.60 B. Perry/O. Amend ShClyst TuffGvlCoal cP 20 Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2883' 2883' 0' Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 46 L-80 Oil / Water 2883' Alkal 1.117 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Kori Jo Plowman / Doug Acker Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 0 0 Cly 0 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 5263 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Kori Jo Plowman / Doug Acker 2338 0 13.38'' 747 150 Units* Casing Summary Lithology (%) 0 L-80 Oil / Water 3268' Alkal 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 47 C-5n 3268' 178.0 C-2 52 in 0 2955'Minimum Depth Time: 23 2883' 3268' 385' Max @ ft Current 3193'97.9 Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 374.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Perry/O. Amend ShClyst TuffGvlCoal cP 11 2723' 12.25 1.117 Footage 17.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling Ahead PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 0.30 000 40 Smith GF15B Insert Spud Mud 5.9 2883' 120'25 Depth in / out Mud Type Lst 100 Type Average 12Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 20160' 2883' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 2 The maximum gas was 52 units at 3268’ MD and the average gas was 23 units Drill f/2905' t/3268'. inspect brakes. CBU for FIT test, recip. f/2814' t/2721'. R/U & perfrom LOT, LOT 10.6ppg EMW. Break circ.& wash/ream f/2814' t/2905'. Drill f/2905' t/3247', 2815' TVD. 2878' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 4.0 16 9.35 Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 10 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 15-Jun-2014 12:00 AM Current Pump & Flow Data: 1019 Max 0 Chlorides (mg/L) 800 P/U BHA #4 as per SLB. RIH f/655' t/2534, SHT @1500'. Wash/Ream f/2534' t/2795', drill out float equip. shoe track Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Conitue to drill from 3268' MD to 4215' MD. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides (mg/L) 1300 0 16-Jun-2014 12:00 AM Current Pump & Flow Data: 1154 Max Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 11 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.60 DOYON15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 4.5 16 9.35 Hughes MX-1 Mill Tooth 9.30 Size 2 The maximum gas was 22 units at 3980’ MD and the average gas was 12 units 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 20160' 2883' WOB EVEMAR 9.409.50 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 5Background (max) Trip Average Mud Type Lst 85 Type 40 Smith GF15B Insert Spud Mud 5.1 2883' 120'31 Depth in / out YP (lb/100ft2) 0.30 000 00 CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling Ahead PV 2723' 12.25 1.117 Footage 17.60 B. Perry/O. Amend ShClyst TuffGvlCoal cP 16 Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 306.0 Flow In (gpm) Flow In (spm) 3268' 4215' 947' Max @ ft Current 3306'117.0 Date: Time: 12 in 0 2883'Minimum Depth C-5n 3980' 16.0 C-2 22 SPP (psi) Gallons/stroke TFABit Type Depth 2/9455 L-80 Oil / Water 4201' Alkal 1.117 0 0 0 Siltst 13.38'' 744 150 Units* Casing Summary Lithology (%) 0 15 1286 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Kori Jo Plowman / Doug Acker Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 0 0 Cly 2278 . . * 24 hr Recap: (max)(current) BTC 115 0 Cly 120937 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Kori Jo Plowman / Doug Acker 8324 655 13.38'' 848 170 Units* Casing Summary Lithology (%) 0 L-80 Oil / Water 5206' Alkal 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 2.75/92.355 C-5n 4806' 0.0 C-2 988 in 6 4380'Minimum Depth Time: 83 4215' 5207' 992' Max @ ft Current 4308'98.7 Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 385.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Perry/O. Amend ShClyst TuffGvlCoal cP 15 2723' 12.25 1.117 Footage 17.60 Ss Ratio C-1 C-5i AK-AM-0901412968 TD Intermediate PV 24 hr Max 68.0 Weight 9 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 0.20 000 40 Smith GF15B Insert Spud Mud 4.4 2883' 120'29 Depth in / out Mud Type Lst 100 Type Average 12Background (max) Trip 9.9010.00 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 20160' 2883' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 12 2 The maximum gas was 988 units at 4806’ MD and the average gas was 83 units 2878' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.0 16 9.35 Hughes MX-1 Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.10 DOYON15 Report For: Morning Report Report # 12 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 17-Jun-2014 12:00 AM Current Pump & Flow Data: 1594 Max 1 Chlorides (mg/L) 1600 Conitue to drill 12.25 '' hole; TD intermediate section at 5207' MD. Circulating and backreaming out of hole. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Circulate bottomes up two times. Rack stds back f/5165' to 5056'. BROOH at 850 gpm 1400 psi & 80 rpm to 2878'. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides (mg/L) 1500 0 18-Jun-2014 12:00 AM Current Pump & Flow Data: Max 1-3-BT-G-E-1-WT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 13 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.0 16 9.35 Hughes MX-1 Mill Tooth 9.35 Size 2 The maximum gas was 190 units Monitor well. 10 min. Static. POH to 2160'. Pump 25 bbl 11.4 lb/gal dry job. POH. L/D BHA #4. 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 25 20160' 2883' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 9Background (max) Trip Average Mud Type Lst 100 Type 40 40 Smith GF15B Insert Spud Mud 4.8 2883' 120'27 5207' Depth in / out YP (lb/100ft2) 0.20 000 00 CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Run Casing PV 2723' 12.25 1.117 Footage 34.30 2324' 17.60 J. Keener/O. Amend ShClyst TuffGvlCoal cP 14 Gas Summary 0 0 0 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 5207' 5207' 0' Max @ ft Current Date: Time: 13 in 0Minimum Depth C-5n 0.0 C-2 190 SPP (psi) Gallons/stroke TFABit Type Depth 2.5/92.559 L-80 Oil / Water 5207' Alkal 1.117 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 01328 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Kori Jo Plowman / Doug Acker Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 0 0 Cly 19026 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 17286 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Kori Jo Plowman / Doug Acker 0 0 13.38'' Units* Casing Summary Lithology (%) 0 L-80 Oil / Water 5207' Alkal 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 3/9348 C-5nC-2 172 in 0Minimum Depth Time: 5207' 5207' 0' Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J. Keener/O. Amend ShClyst TuffGvlCoal cP 9 2723' 12.25 1.117 Footage 34.30 2324' 17.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Cement Job PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 0.15 000 40 40 Smith GF15B Insert Spud Mud 4.6 2883' 120'16 5207' Depth in / out Mud Type Lst 100 Type Average 1729Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools TeleScope 825,ARC 825,GyroPulse Collar API FL Chromatograph (ppm) 25 20160' 2883' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 2 The maximum gas was 172 units 2878' 160' Condition 1-1-WT-A-E-I-NO-TD Bit # 1 5.0 16 9.40 Hughes MX-1 Mill Tooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 14 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE 1-3-BT-G-E-1-WT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 19-Jun-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides (mg/L) 1500 Float 9 5/8" csg to 126'. Test floats. OK. RIH csg f/126' to 5192' MD. Calc disp observed. R/D Tesco equip. R/U cmt Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:N/D BOP. Set e-slips & cut 9 5/8" csg. N/U BOP & test BOP. Test 9 5/8" csg to 3000 psi for 30 min. P/U BHA #5. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides (mg/L) 1500 0 20-Jun-2014 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 15 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-3-BT-G-E-1-WT-TD Bit # 2 5.0 12.25Smith GF15B Insert 9.40 Size 3 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed675, PeriScope675, TeleScope675, EcoScope675 API FL Chromatograph (ppm) 252883' 5207' WOB EVEMAR Avg Min Comments Surface RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Type 40 Hycalog SKH616M-E1D PDC LSND 4.6 5207' 5207'16 Depth in / out YP (lb/100ft2) 9.00 000 00 Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901412968 RIH BHA #5 PV 2324' 8.75"0.902 Footage 34.30 J. Keener/O. Amend ShClyst TuffGvlCoal cP 9 40.0 Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 5207' 5207' 0' Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 1550 L-80 MBT 5207' pH 1.117 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly . . * 24 hr Recap: (max)(current) BTC 264 0 Cly 268387 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 24 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher 129586 14 13.38'' 601 120 Units* Casing Summary Lithology (%) 33 L-80 Oil/Water 6203' Alkal 1.117 0 105 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 67/3346 C-5n 5867' 126.0 C-2 2341 in 0 5207'Minimum Depth Time: new hole. Drill ahead to 6203' MD. Samples were mostly sltst f/ 5207' MD to 5500' MD & clean sst f/ 5500' MD to 6200' MD. 942 Max Gas: 2341u Avg Gas: 942u 5207' 6203' 996' Max @ ft Current 5908'241.0 Date: Avg to5207' Yesterday's Depth: Current Depth: 24 Hour Progress: 440.5 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 107 58 (current) J. Keener/O. Amend ShClyst TuffGvlCoal cP 14 2324' 8.75"0.902 Footage 34.30 Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling ahead PV 24 hr Max 68.0 Weight 97 Hours C-3 00 Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 2.65 53016 40 Hycalog SKH616M-E1D PDC FazePro 4.6 5207' 5768'19 Depth in / out Mud Type Lst 100 Hydril S53 Type Average 302Background (max) Trip 9.7511.31 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed675, PeriScope675, TeleScope675, EcoScope675 API FL Chromatograph (ppm) 252883' 5207' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 151 3 2878' 160' Condition 1-3-BT-G-E-1-WT-TD Bit # 2 6.8 12.25Smith GF15B Insert 9.25 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 16 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 21-Jun-2014 12:00 AM Current Pump & Flow Data: 1628 Max 50 Lime (lb/bbl) 3 RIH w/ BHA #5. SHT MWD tools. Continue to RIH. Displace f/ LSND to FazePro. Drilled out shoe then 20' Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill ahead f/ 6203' MD to midnight depth of 8296' MD. Samples consisted of clean sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 3 178 22-Jun-2014 12:00 AM Current Pump & Flow Data: 1722 Max Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 17 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.73 DOYON15 Report For: Condition 1-3-BT-G-E-1-WT-TD Bit # 2 7.2 12.25Smith GF15B Insert 9.20 Size 3 2878' 160' 100% Gas In Air=10,000 UnitsConnection 298 Tools Xceed675, PeriScope675, TeleScope675, EcoScope675 API FL Chromatograph (ppm) 252883' 5207' WOB EVEMAR 9.9910.36 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 96Background (max) Trip Average Mud Type Lst 100 Hydril S53 Type 40 Hycalog SKH616M-E1D PDC FazePro N/A 5207' 8024'14 Depth in / out YP (lb/100ft2) 2.40 50170104 00 Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 215 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling ahead PV 2324' 8.75"0.902 Footage 34.30 J. Keener/O. Amend ShClyst TuffGvlCoal cP 12 40.0 Gas Summary 0 259 140 (current) Avg to5207' Yesterday's Depth: Current Depth: 24 Hour Progress: 569.8 Flow In (gpm) Flow In (spm) 6203' 8296' 2093' Max @ ft Current 6376'272.8 Date: Time: 1002 Max Gas: 2272u Avg Gas: 1002u in 10 6471'Minimum Depth C-5n 6405' 27.0 C-2 2272 SPP (psi) Gallons/stroke TFABit Type Depth 69/3141 L-80 Oil/Water 8296' Alkal 1.117 0 235 0 Siltst 13.38'' 591 139 Units* Casing Summary Lithology (%) 155128207 67 907-685-0772Unit Phone: 62 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 394 0 Cly 256058 . . * 24 hr Recap: (max)(current) BTC 380 0 Cly 286845 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 82 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher 104543 155 13.38'' 552 120 Units* Casing Summary Lithology (%) 124 L-80 Oil/Water 10803' Alkal 1.117 0 248 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 70/3043 C-5n 8837' 165.0 C-2 2651 in 16 8391'Minimum Depth Time: 1291 Max Gas: 2651u Avg Gas: 12910u 8296' 10803' 2507' Max @ ft Current 9645'290.7 Date: Avg to5207' Yesterday's Depth: Current Depth: 24 Hour Progress: 465.6 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 280 170 (current) J. Keener/O. Amend ShClyst TuffGvlCoal cP 12 2324' 8.75"0.902 Footage 34.30 Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling ahead PV 24 hr Max 68.0 Weight 158 Hours C-3 04 Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 2.90 54142107 40 Hycalog SKH616M-E1D PDC FazePro NA 5207' 10565'17 Depth in / out Mud Type Lst 100 Hydril S53 Type Average 33Background (max) Trip 10.1212.20 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed675, PeriScope675, TeleScope675, EcoScope675 API FL Chromatograph (ppm) 252883' 5207' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 289 3 2878' 160' Condition 1-3-BT-G-E-1-WT-TD Bit # 2 7.6 12.25Smith GF15B Insert 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 18 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 23-Jun-2014 12:00 AM Current Pump & Flow Data: 2036 Max 122 Lime (lb/bbl) 4 Drill ahead f/ 8296' MD to midnight depth of 10803' MD. Samples consisted of clean sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill ahead f/ 10803' MD to midnight depth of 12110' MD. Samples consisted of clean sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 4 67 24-Jun-2014 12:00 AM Current Pump & Flow Data: 1964 Max Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 19 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-3-BT-G-E-1-WT-TD Bit # 2 8.1 12.25Smith GF15B Insert 9.20 Size 3 2878' 160' 100% Gas In Air=10,000 UnitsConnection 173 Tools Xceed675, PeriScope675, TeleScope675, EcoScope675 API FL Chromatograph (ppm) 252883' 5207' WOB EVEMAR 9.8410.93 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 72Background (max) Trip Average Mud Type Lst 100 Hydril S53 Type 40 Hycalog SKH616M-E1D PDC FazePro NA 5207' 15 Depth in / out YP (lb/100ft2) 3.10 297559 65 Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 135 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling ahead PV 2324' 8.75"0.902 Footage 34.30 J. Keener/R. Wimmer ShClyst TuffGvlCoal cP 12 40.0 Gas Summary 8 173 116 (current) Avg to5207' Yesterday's Depth: Current Depth: 24 Hour Progress: 605.8 Flow In (gpm) Flow In (spm) 10803' 12110' 1307' Max @ ft Current 11725'268.2 Date: Time: 1094 Max Gas: 2964u Avg Gas: 1094u in 16 11012'Minimum Depth C-5n 11751' 2.3 C-2 2964 SPP (psi) Gallons/stroke TFABit Type Depth 69/3142 L-80 Oil/Water 12110' Alkal 1.117 0 169 0 Siltst 13.38'' 541 118 Units* Casing Summary Lithology (%) 71129763 94 907-685-0772Unit Phone: 53 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 338 0 Cly 321304 . . * 24 hr Recap: (max)(current) BTC 453 22 Cly 350884 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 43 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher 153715 5020 13.38'' 551 120 Units* Casing Summary Lithology (%) 116 L-80 Oil/Water 14306' Alkal 1.117 12 187 17 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 71/2946 C-5n 13824' 0.0 C-2 3420 in 18 12271'Minimum Depth Time: 1513 Max Gas: 3420u Avg Gas: 1513u 12110' 14306' 2196' Max @ ft Current 14125'290.5 Date: Avg to5207' Yesterday's Depth: Current Depth: 24 Hour Progress: 572.4 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 25 180 104 (current) J. Keener/R. Wimmer ShClyst TuffGvlCoal cP 12 2324' 8.75"0.902 Footage 34.30 Ss Ratio C-1 C-5i AK-AM-0901412968 Drilling ahead PV 24 hr Max 68.0 Weight 240 Hours C-3 1423 Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 3.00 3711578 40 Hycalog SKH616M-E1D PDC FazePro NA 5207' 14215'17 Depth in / out Mud Type Lst 100 Hydril S53 Type Average 112Background (max) Trip 10.0212.00 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed675, PeriScope675, TeleScope675, EcoScope675 API FL Chromatograph (ppm) 252883' 5207' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 182 3 2878' 160' Condition 1-3-BT-G-E-1-WT-TD Bit # 2 8.3 12.25Smith GF15B Insert 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 20 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 25-Jun-2014 12:00 AM Current Pump & Flow Data: 2263 Max 94 Lime (lb/bbl) 4 Drill ahead f/ 12110' MD to midnight depth of 114306' MD. Samples consisted of clean sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill ahead f/ 14306' MD to production section of 15216' MD. BROOH. Samples consisted of clean sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 3.77 78 26-Jun-2014 12:00 AM Current Pump & Flow Data: 2201 Max Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 21 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-3-BT-G-E-1-WT-TD Bit # 2 8.2 12.25Smith GF15B Insert 9.20 Size 3 2878' 160' 100% Gas In Air=10,000 UnitsConnection 145 Tools Xceed675, PeriScope675, TeleScope675, EcoScope675 API FL Chromatograph (ppm) 252883' 5207' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 94Background (max) Trip Average 104 Mud Type Lst 100 Hydril S53 Type 40 Hycalog SKH616M-E1D PDC FazePro NA 5207' 15216'18 Depth in / out YP (lb/100ft2) 2.90 227849 1413 Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 259 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 BROOH PV 2324' 8.75"0.902 Footage 34.30 J. Keener/R. Wimmer ShClyst TuffGvlCoal cP 12 40.0 Gas Summary 23 132 76 (current) Avg to5207' Yesterday's Depth: Current Depth: 24 Hour Progress: 447.7 Flow In (gpm) Flow In (spm) 14306' 15216' 910' Max @ ft Current 14777'278.5 Date: Time: 1458 Max Gas: 3166u Avg Gas: 1458u in 18 14325'Minimum Depth C-5n 14946' C-2 3166 SPP (psi) Gallons/stroke TFABit Type Depth 71/2943 L-80 Oil/Water 15216' Alkal 1.117 0 147 6 Siltst 13.38'' 546 110 Units* Casing Summary Lithology (%) 86166286 226 907-685-0772Unit Phone: 31 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 429 0 Cly 331764 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher 0 0 13.38'' 546 110 Units* Casing Summary Lithology (%) 0 L-80 Oil/Water 15216' Alkal 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 72/2841 C-5nC-2 in Minimum Depth Time: Max Gas: 17u 15216' 15216' 0' Max @ ft Current Date: Avg to5207' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) J. Keener/R. Wimmer ShClyst TuffGvlCoal cP 12 2324' 8.75"0.902 Footage 34.30 Ss Ratio C-1 C-5i AK-AM-0901412968 BROOH PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 2.60 000 40 Hycalog SKH616M-E1D PDC FazePro NA 5207' 15216'13 Depth in / out Mud Type Lst Hydril S53 Type Average 17Background (max)Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed675, PeriScope675, TeleScope675, EcoScope675 API FL Chromatograph (ppm) 252883' 5207' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 3 2878' 160' Condition 1-3-BT-G-E-1-WT-TD Bit # 2 8.3 12.25Smith GF15B Insert 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 22 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 27-Jun-2014 12:00 AM Current Pump & Flow Data: 1434 Max 0 Lime (lb/bbl) 3.38 Cont to BROOH. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Cont to BROOH. L/D BHA #5. R/U liner equip & RIH w/ 5.5" liner. Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 3.38 0 28-Jun-2014 12:00 AM Current Pump & Flow Data: Max 1-1-CT-A-X-IN-NO-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 23 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-3-BT-G-E-1-WT-TD Bit # 2 8.3 12.25Smith GF15B Insert 9.20 Size 3 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 15 252883' 5207' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Background (max) Trip Average 7 Mud Type Lst Hydril S53 Type 160 40 Hycalog SKH616M-E1D PDC FazePro NA 5207' 15216'13 15216' Depth in / out YP (lb/100ft2) 2.60 000 00 Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 RIH 5.5" Liner PV 2324' 8.75"0.902 Footage 82.30 10009' 34.30 J. Keener/R. Wimmer ShClyst TuffGvlCoal cP 12 40.0 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 15216' 15216' 0' Max @ ft Current Date: Time: Max Gas: 7u in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 72/2840 L-80 Oil/Water Alkal 1.117 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 0 . . * 24 hr Recap:Run 5.5" liner from 2722' MD to 10112' MD. Pick up power tongs, M/U seal assembly, set slim pulse in collar. M/U Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 2.60 0 29-Jun-2014 12:00 AM Current Pump & Flow Data: Max 1-1-CT-A-X-IN-NO-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 24 Customer: Well: Area: Location: Rig: SP12-SE3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-3-BT-G-E-1-WT-TD Bit # 2 8.0 12.25Smith GF15B Insert 9.20 Size 3 Set hanger and test.OK 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 15 252883' 5207' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Hydril 563 Type 160 40 Hycalog SKH616M-E1D PDC FazePro NA 5207' 15216'12 15216' Depth in / out YP (lb/100ft2) 2.00 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Test Backside PV 2324' 8.75" 0.902 Footage 82.30 10009' 34.30 J. Keener/R. Wimmer ShClyst TuffGvlCoal cP 11 40.0 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 15216' 15216' 0' Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 71/2940 L-80 Oil/Water Alkal 1.117 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 0 . . * 24 hr Recap:Unsting f/ TOL. POOH 3 stnds. Cut & slip. POOH & L/D running tool. P/U Whipstock BHA & RIH to 4922' MD. Orient Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 2.99 0 30-Jun-2014 12:00 AM Current Pump & Flow Data: Max 1-1-CT-A-X-IN-NO-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 25 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-3-BT-G-E-1-WT-TD Bit # 2 8.0 12.25Smith GF15B Insert 9.20 Size 3 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 15 252883' 5207' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Hydril 563 Type 160 40 Hycalog SKH616M-E1D PDC FazePro NA 5207' 15216'12 15216' Depth in / out YP (lb/100ft2) 2.30 000 00 Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 RIH w/ Whipstock PV 2324' 8.75"0.902 Footage 82.30 10009' 34.30 J. Keener/R. Wimmer ShClyst TuffGvlCoal cP 11 40.0 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 15216' 15216' 0' Max @ ft Current Date: Time: whipstock to 5064' MD & set. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 71/2940 L-80 Oil/Water Alkal 1.117 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 0 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 965 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher 681 42 13.38'' 447 90 Units* Casing Summary Lithology (%) 0 L-80 Oil/Water 5031' Alkal 0.902 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 71/2941 C-5n 5019' C-2 18 in 10 4998'Minimum Depth Time: milling BHA. Service rig. P/U BHA #7 & RIH. Perform FIT to 13.0ppg. Orient MWD/Motor. 14 5009' 5031' 22' Max @ ft Current 5015'18.3 Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: 27.6 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) M. Ross/R. Wimmer ShClyst TuffGvlCoal cP 11 10009' 8.75"0.746 Footage 82.30 Ss Ratio C-1 C-5i AK-AM-0901412968 Orient MWD/Motor PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 2.35 000 160 Smith XR+CPS Mill Tooth FazePro NA 5031' 5032'12 Depth in / out Mud Type Lst Hydril 563 Type Average 5Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools SP Motor, TeleScope 675 API FL Chromatograph (ppm) 155207' 15216' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 4RR 2878' 160' Condition 1-1-CT-A-X-IN-NO-TD Bit # 3 8.0 8.75"Hycalog SKH616M-E1D PDC 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 26 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 1-Jul-2014 12:00 AM Current Pump & Flow Data: 1398 Max 0 Lime (lb/bbl) 3.06 Mill 8.75" window in 9 5/8" csg f/ 4992' MD to 5032' MD. Pump sweep, monitor well & pump dry job. POOH & L/D Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 5540 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher 90 2267 580 13.38'' Units* Casing Summary Lithology (%) 0 L-80 Oil/Water 5031' Alkal 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 71/2942 C-5n 5152' C-2 48 in 2 5031'Minimum Depth Time: 48u & the avg gas was 25u. Samples consisted of 50-90% sltst w/ some sst. 25 Max Gas: 48u Average Gas: 25u 5031' 5232' 201' Max @ ft Current 5106'83.2 Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: 297.4 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) M. Ross/R. Wimmer ShClyst TuffGvlCoal cP 10 200' 8.75"0.902 Footage 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 RIH w/ BHA #8 PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 2.00 000 40 Hycalog SKH616M-E1D FazePro NA 5232' 5232'14 Depth in / out Mud Type Lst 10 Hydril 563 Type Average 2415Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 5 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.0 8.75"Smith XR+CPS Mill Tooth 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 27 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 2-Jul-2014 12:00 AM Current Pump & Flow Data: Max 0 Lime (lb/bbl) 2.60 Drill f/ 5031' MD to 5232' MD. CBU x3 & POOH. L/D BHA. R/U & Test BOP. P/U BHA #8 & RIH. The max gas was Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) BTC 376 0 Cly 222128 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 68 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher 0 94784 571 13.38'' 546 110 Units* Casing Summary Lithology (%) 109 L-80 Oil/Water 5031' Alkal 0.746 0 240 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 73/2744 C-5n 6887' 54.1 C-2 1954 in 0 5448'Minimum Depth Time: ahead to 7096' MD. Max gas was 1954u. Samples consist of mostly clean sst. 629 Max Gas: 1954u Average Gas: 629u 5232' 7096' 1864' Max @ ft Current 6937'290.9 Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: 550.4 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 268 145 (current) M. Ross/R. Wimmer ShClyst TuffGvlCoal cP 14 200' 8.75"0.902 Footage 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Drill 8.75" L1 Hole PV 24 hr Max 68.0 Weight 150 Hours C-3 00 Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 2.20 4013282 40 Hycalog SKH616M-E1D FazePro NA 5232' 6619'14 Depth in / out Mud Type Lst 100 Hydril 563 Type Average 715Background (max) Trip 10.04 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 296 5 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 9.5 8.75"Smith XR+CPS Mill Tooth 9.25 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 28 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 3-Jul-2014 12:00 AM Current Pump & Flow Data: 1829 Max 123 Lime (lb/bbl) 2.86 RIH w/ BHA. SHT MWD, Ecoscope failure. POOH & C/O Ecoscope. RIH & MADD Pass f/ 5030' MD to 5232' MD. Drill Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill ahead / 7096' MD to 9745' MD. Max gas was 2204u @ 7998' MD. Samples consisted of sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 2.73 170 4-Jul-2014 12:00 AM Current Pump & Flow Data: 1986 Max Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 29 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 9.1 8.75"Smith XR+CPS Mill Tooth 9.25 Size 5 2878' 160' 100% Gas In Air=10,000 UnitsConnection 331 Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 185031' 5232' WOB EVEMAR 10.3411.70 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 66Background (max) Trip Average Mud Type Lst 100 Hydril 563 Type 40 Hycalog SKH616M-E1D FazePro NA 5232' 9548'17 Depth in / out YP (lb/100ft2) 2.10 70199136 03 Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 209 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Drill 8.75" L1 Hole PV 200' 8.75"0.902 Footage 2.60 M. Ross/R. Wimmer ShClyst TuffGvlCoal cP 12 40.0 Gas Summary 0 338 203 (current) Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: 520.4 Flow In (gpm) Flow In (spm) 7096' 9745' 2649' Max @ ft Current 7814'290.6 Date: Time: 975 Max Gas: 2204u Average Gas: 975u in 10 7681'Minimum Depth C-5n 7998' 67.6 C-2 2204 SPP (psi) Gallons/stroke TFABit Type Depth 72/2844 L-80 Oil/Water 5031' Alkal 0.746 0 298 0 Siltst 13.38'' 541 109 Units* Casing Summary Lithology (%) 165 0 111973 92 907-685-0772Unit Phone: 99 Leigh Ann Rasher Maximum Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 379 0 Cly 245422 . . * 24 hr Recap: (max)(current) BTC 355 0 Cly 301060 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 62 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker 0 136730 182 13.38'' 541 109 Units* Casing Summary Lithology (%) 112 L-80 Oil/Water 5031' Alkal 0.746 0 182 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 2 13/2944 C-5n 11868' 289.0 C-2 2756 in 17 11921'Minimum Depth Time: 1183 Max Gas:2756u Average Gas: 1183u 9745' 12387' 2642' Max @ ft Current 11140'294.0 Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: 437.0 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 200 128 (current) M. Ross/R. Wimmer ShClyst TuffGvlCoal cP 12 200' 8.75" 0.902 Footage 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Drill 8.75" L1 Hole PV 24 hr Max 68.0 Weight 175 Hours C-3 04 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 2.30 5013199 40 Hycalog SKH616M-E1D FazePro NA 5232' 9548'18 Depth in / out Mud Type Lst 100 Hydril 563 Type Average 248Background (max) Trip 11.1011.20 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 183 5 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.5 8.75" 9.30 Smith XR+CPS Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 30 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 5-Jul-2014 12:00 AM Current Pump & Flow Data: 1986 Max 101 Lime (lb/bbl) 2.99 Drill ahead / 9745' MD to 12387' MD. Max gas was 2756u @ 11868' MD. Samples consisted of sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill ahead / 12387' MD to 14775' MD. Max gas was 2246u @ 13332' MD. Samples consisted of sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 2.73 92 6-Jul-2014 12:00 AM Current Pump & Flow Data: 2282 Max Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 31 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.40 DOYON15 Report For: Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 9.1 8.75" 9.30 Smith XR+CPS Mill Tooth 9.30 Size 5 2878' 160' 100% Gas In Air=10,000 UnitsConnection 152 Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 185031' 5232' WOB EVEMAR 11.1011.20 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 109Background (max) Trip Average Mud Type Lst 100 Hydril 563 Type 40 Hycalog SKH616M-E1D FazePro NA 5232' 14684'20 Depth in / out YP (lb/100ft2) 2.10 3411477 04 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 264 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Drill 8.75" L1 Hole PV 200' 8.75" 0.902 Footage 2.60 M. Ross/R. Wimmer ShClyst TuffGvlCoal cP 11 40.0 Gas Summary 0 180 112 (current) Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: 432.0 Flow In (gpm) Flow In (spm) 12387' 14775' 2388' Max @ ft Current 14665'274.0 Date: Time: 1160 Max Gas: 2246u Average Gas: 1160u in 15 7681'Minimum Depth C-5n 13332' 251.0 C-2 2246 SPP (psi) Gallons/stroke TFABit Type Depth 2 19/2744 L-80 Oil/Water 14684' Alkal 0.746 0 167 0 Siltst 13.38'' 500 110 Units* Casing Summary Lithology (%) 109 0 134691 152 907-685-0772Unit Phone: 53 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 394 0 Cly 250903 . . * 24 hr Recap: (max)(current) BTC 399 0 Cly 218740 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 51 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker 0 185003 123 13.38'' 556 111 Units* Casing Summary Lithology (%) 118 L-80 Oil/Water 15245' Alkal 0.746 0 159 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 72 / 2844 C-5n 15109' 0.0 C-2 2063 in 12 14960'Minimum Depth Time: 1554 Max Gas: 2063u Average Gas: 1554u 14775' 15245' 470' Max @ ft Current 15060'293.0 Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: 424.0 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 162 111 (current) M. Ross/R. Wimmer ShClyst TuffGvlCoal cP 14 200' 8.75" 0.902 Footage 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Drill 8.75" L1 Hole PV 24 hr Max 68.0 Weight 297 Hours C-3 04 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 2.00 3812382 40 Hycalog SKH616M-E1D FazePro NA 5232' 14684'15 Depth in / out Mud Type Lst 100 Hydril 563 Type Average 118Background (max) Trip 11.1011.20 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 128 5 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 9.1 8.75" 9.25 Smith XR+CPS Mill Tooth 9.25 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.40 DOYON15 Report For: Morning Report Report # 32 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 7-Jul-2014 12:00 AM Current Pump & Flow Data: 1976 Max 96 Lime (lb/bbl) 2.60 Drill ahead / 14775' MD to TD 15245' MD. Max gas was 2063u @ 15109' MD. Samples consisted of sst. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:BROOH from 9922' to 5117'. Work DS through tight spots and pack offs as hole will allow T/5462' MD @5406' MD Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 2.60 0 8-Jul-2014 12:00 AM Current Pump & Flow Data: 1077 Max Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 33 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.20 DOYON15 Report For: Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 9.1 8.75" 9.25 Smith XR+CPS Mill Tooth 9.25 Size 5 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 185031' 5232' WOB EVEMAR 10.9011.00 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 7Background (max) Trip Average Mud Type Lst 100 Hydril 563 Type 40 Hycalog SKH616M-E1D FazePro NA 5232' 14684'15 Depth in / out YP (lb/100ft2) 2.00 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 BROOH PV 200' 8.75" 0.902 Footage 2.60 M. Ross/O. Amend ShClyst TuffGvlCoal cP 14 40.0 Gas Summary 0 0 0 (current) Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 15245' 15245' 0' Max @ ft Current Date: Time: 10 Max Gas: 139u Average Gas: 10u in 0Minimum Depth C-5nC-2 139 SPP (psi) Gallons/stroke TFABit Type Depth 72 / 2844 L-80 Oil/Water 15245' Alkal 0.746 0 0 0 Siltst 13.38'' 450 99 Units* Casing Summary Lithology (%) 0 0 1535 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 15358 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 14286 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker 1053 13.38'' 152 25 Units* Casing Summary Lithology (%) 0 L-80 Oil/Water 15245' Alkal 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 2 19/2743 C-5nC-2 137 in 0Minimum Depth Time: 9 Max Gas: 137u Average Gas: 9u 15245' 15245' 0' Max @ ft Current Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) M. Ross/O. Amend ShClyst TuffGvlCoal cP 11 200' 8.75" 0.902 Footage 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 RIH W/BHA # 1B PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 2.40 000 40 Hycalog SKH616M-E1D FazePro NA 5232' 14684'17 Depth in / out Mud Type Lst Hydril 563 Type Average 5Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 5 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.6 8.75" 0.00 Smith XR+CPS Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 34 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 9-Jul-2014 12:00 AM Current Pump & Flow Data: 1077 Max 0 Lime (lb/bbl) 3.12 BROOH F/ 4880' MD to 3476' MD Circ. B/U 2X. POOH F/3476' MD T/957' MD. POOH F/957' MD to 397' MD. L/D BHA Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:POOH F/4940' MD T/490' MD. L/D BHA #1B, NO Whipstock on Hook. M/U BHA #1B. RIH F/491' MD to 1518' MD SHT Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 2.99 0 10-Jul-2014 12:00 AM Current Pump & Flow Data: Max 1-2-BT-A-X-In-CT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 35 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.7 8.75" 0.00 Smith XR+CPS Mill Tooth 9.25 Size 5 Static Loss. Drop Ball rod @ 4942' MD P/U T/4911' MD. POOH F/4942' MD T/490' MD 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 15 185031' 5232' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 0Background (max) Trip Average Mud Type Lst Hydril 563 Type 160 40 Hycalog SKH616M-E1D FazePro NA 5232' 14684'16 15245' Depth in / out YP (lb/100ft2) 2.30 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 POOH w/ Whip Stock PV 200' 8.75" 0.902 Footage 55.90 4050' 2.60 M. Ross/O. Amend ShClyst TuffGvlCoal cP 11 40.0 Gas Summary 0 0 0 (current) Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 15245' 15245' 0' Max @ ft Current Date: Time: 2 Max Gas: 6u Average Gas: 2u in 0Minimum Depth C-5nC-2 6 SPP (psi) Gallons/stroke TFABit Type Depth 73 / 27'43 L-80 Oil/Water 15245' Alkal 0.746 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 0235 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 721 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 508 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker 289 13.38'' Units* Casing Summary Lithology (%) 0 L-80 Oil/Water 15245' Alkal 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 2 19/2743 C-5nC-2 5 in 0Minimum Depth Time: 2 Max Gas: 5u Average Gas: 2u 15245' 15245' 0' Max @ ft Current Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) M. Ross/O. Amend ShClyst TuffGvlCoal cP 11 200' 8.75" 0.902 Footage 55.90 4050' 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Waiting On Diverter PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 2.30 000 160 40 Hycalog SKH616M-E1D FazePro NA 5232' 14684'18 15245' Depth in / out Mud Type Lst Hydril 563 Type Average 2Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 15 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 5 Prep well for well control. wait on replacement diverter. Load Comp. Tools and MWD in Shed. M/U Diverter w/hanger seal assy. Stage up pumps to verify tool release. Unsuccessful. flow rate. Wash Up T/4990' MD. Circ. B/U @400 GPM. POOH F/4937' MD T/80' MD L/D Cleanout BHA As per Baker Rep. Clean BHA. r. 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.1 8.75" 72 / 28' Smith XR+CPS Mill Tooth 9.25 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 36 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE 1-2-BT-A-X-In-CT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 11-Jul-2014 12:00 AM Current Pump & Flow Data: Max 0 Lime (lb/bbl) 2.99 L/D Whipstock Retrieval BHA, Whipstock and Anchor Assy As Per Baker Rep. Clean rig floor. M/U Baker cleanout Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:M/U BHA. RIH w/seal assy on 5" DP. F/150' MD T/4917' MD. w/SHT @ 1500' MD W/D F/4917' MD T/5086' MD Verify Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 2.60 0 12-Jul-2014 12:00 AM Current Pump & Flow Data: Max 1-2-BT-A-X-In-CT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 37 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.2 8.75"Smith XR+CPS Mill Tooth 9.25 Size 5 T/3292' MD. 80 Jts Run. 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 15 185031' 5232' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 0Background (max) Trip Average Mud Type Lst Hydril 563 Type 160 40 Hycalog SKH616M-E1D FazePro NA 5232' 14684'15 15245' Depth in / out YP (lb/100ft2) 2.20 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 RIH w/ Liner PV 200' 8.75" 0.902 Footage 55.90 4050' 2.60 B. Perry/O. Amend ShClyst TuffGvlCoal cP 12 40.0 Gas Summary 0 0 0 (current) Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 15245' 15245' 0' Max @ ft Current Date: Time: 0 Max Gas: 0u Average Gas: 0u in 0Minimum Depth C-5nC-2 0 SPP (psi) Gallons/stroke TFABit Type Depth 72/2843 L-80 Oil/Water 15245' Alkal 0.746 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 0 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker 0 0 13.38'' Units* Casing Summary Lithology (%) 0 L-80 Oil/Water 15245' Alkal 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 72/2843 C-5nC-2 0 in 0Minimum Depth Time: 0 Max Gas: 0u Average Gas: 0u 15245' 15245' 0' Max @ ft Current Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) B. Perry/O. Amend ShClyst TuffGvlCoal cP 12 200' 8.75" 0.902 Footage 55.90 4050' 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 RIH w/LEM Tool PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 2.20 000 160 40 Hycalog SKH616M-E1D FazePro NA 5232' 14684'15 15245' Depth in / out Mud Type Lst Hydril 563 Type Average 0Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 15 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 5 liner packer. Top @ 4981' MD. Shoe @ 15200' MD. Displace 9.2+ OBM w/9.1+ Brine. POOH on Elevators. L/D liner running tools. Service brake T/15093' MD. Break Circ. W/D T/15183' MD.Observe drop into Alignment slot. Drop Setting Ball. P/U Ensure Ram is Set. Successful. 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.2 8.75"Smith XR+CPS Mill Tooth 9.25 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 38 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE 1-2-BT-A-X-In-CT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 13-Jul-2014 12:00 AM Current Pump & Flow Data: Max 0 Lime (lb/bbl) 2.60 RIH w/5.5" Liner F/3292' MD T/10176' MD Entry into SBD @ 4985' MD. w/Window Exit @ 5007' MD P/U & M/U Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:L/D liner top Packer, P/U & M/U LEM tool. M/U Liner top Packer to slim hole MWD. Orient as per Baker and SLB reps. Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 0 14-Jul-2014 12:00 AM Current Pump & Flow Data: Max 1-2-BT-A-X-In-CT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 39 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.75"Smith XR+CPS Mill Tooth 9.15 Size 5 RIH w/5.5' DP T/3000' MD POOH Set mouse hole. R/U to test BOPs POOH and L/D 5.5" DP. F/4970' MD T/ 3755' MD Cont. POOH F/3755' MD L/D DP, L/D LEM Running tool and MWD. M/U Shoe, and W/D Through top of RAM hanger. Seat packer. Packer Set. Test Packer. Successful. Un-sting from LEM. Monitor Well.(Static) 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 15 185031' 5232' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 0Background (max) Trip Average Mud Type Lst Hydril 563 Type 160 40 Hycalog SKH616M-E1D FazePro 5232' 15245' 15245' Depth in / out YP (lb/100ft2) 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Testing BOPs PV 200' 8.75" 0.902 Footage 55.90 4050' 2.60 B. Perry/O. Amend ShClyst TuffGvlCoal cP 40.0 Gas Summary 0 0 0 (current) Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 15245' 15245' 0' Max @ ft Current Date: Time: 0 Max Gas: 0u Average Gas: 0u in 0Minimum Depth C-5nC-2 0 SPP (psi) Gallons/stroke TFABit Type Depth 28 L-80 Oil/Water 15245' Alkal 0.746 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 0 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker 0 0 13.38'' Units* Casing Summary Lithology (%) 0 L-80 Oil/Water 15245' Alkal 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 28 C-5nC-2 0 in 0Minimum Depth Time: 0 Max Gas: 0u Average Gas: 0u 15245' 15245' 0' Max @ ft Current Date: Avg to5031' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) B. Perry/O. Amend ShClyst TuffGvlCoal cP 200' 8.75" 0.902 Footage 55.90 4050' 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 Run 4.5” completion tubing PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 000 160 40 Hycalog SKH616M-E1D FazePro 5232' 15245' 15245' Depth in / out Mud Type Lst Hydril 563 Type Average 0Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed, Periscope, TeleScope, EcoScope API FL Chromatograph (ppm) 15 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 5 sec. Terminate gauge line, motor lead & capillary line. to shroud. Set pack off & test to 1000 psi for 15 min. Good. R/D equip. POH f/138'. RBU upper comp in derrick. M/U & service motor 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.75"Smith XR+CPS Mill Tooth 9.15 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 40 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE 1-2-BT-A-X-In-CT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 15-Jul-2014 12:00 AM Current Pump & Flow Data: Max 0 Lime (lb/bbl) Test BOPE's. C/O lower rams & replace inserts & air pump on Koomey. Complete BOPE test. R/U 4.5" comp Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker 0 0 13.38'' Units* Casing Summary Lithology (%) 0 L-80 Oil/Water Alkal 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 28 C-5nC-2 0 in 0Minimum Depth Time: 0 Max Gas: 0u Average Gas: 0u 15245' 15245' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) B. Perry/O. Amend ShClyst TuffGvlCoal cP 200' 8.75" 0.902 Footage 55.90 4050' 2.60 Ss Ratio C-1 C-5i AK-AM-0901412968 L/D 5" Drill Pipe PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 000 160 40 Hycalog SKH616M-E1D FazePro 5232' 15245' 15245' Depth in / out Mud Type Lst Hydril 563 Type Average 0Background (max) Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 15 185031' 5232' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 5 R/D Centrilift. SIMOPS: Lay down 5" drill pipe via mousehole and bullhead 130 bbls down OA at 2 bpm. 2878' 160' Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.75"Smith XR+CPS Mill Tooth 9.15 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 41 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE 1-2-BT-A-X-In-CT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth 16-Jul-2014 12:00 AM Current Pump & Flow Data: Max 0 Lime (lb/bbl) M/U top seal section to TTC & connect to shroud. Connect TEC to PSI discharge sub. R/U Volant tool. RIH 4.5" tbg to Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:L/D 5" DP. Clean & clear rig floor. N/D BOP. N/U tree. R/U and install TWC. SIMOPS: move rockwasher and mud Density (ppg) out (sec/qt) Viscosity Cor Solids % Lime (lb/bbl) 0 17-Jul-2014 12:00 AM Current Pump & Flow Data: Max 1-2-BT-A-X-In-CT-TD Conductor ROP ROP (ft/hr) 4.96 @ Mud Data Depth Morning Report Report # 42 Customer: Well: Area: Location: Rig: SP12-SE3 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-1-NO-BHA Bit # 4RR 8.75"Smith XR+CPS Mill Tooth 9.15 Size 5 2878' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 15 185031' 5232' WOB EVEMAR Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 0Background (max) Trip Average Mud Type Lst Hydril 563 Type 160 40 Hycalog SKH616M-E1D FazePro 5232' 15245' 15245' Depth in / out YP (lb/100ft2) 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901412968 Moving Rig PV 200' 8.75" 0.902 Footage 55.90 4050' 2.60 B. Perry/O. Amend ShClyst TuffGvlCoal cP 40.0 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 15245' 15245' 0' Max @ ft Current Date: Time: 0 Max Gas: 0u Average Gas: 0u in 0Minimum Depth C-5nC-2 0 SPP (psi) Gallons/stroke TFABit Type Depth 28 L-80 Oil/Water Alkal 0.746 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Doug Acker Maximum Report By:Logging Engineers:Dani Dawson / Doug Acker Set AtSize 178.9 X-65 Grade L-805193' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 0 WELL INFORMATION Created On : Aug 11 2014 Customer :ENI Petroleum Well Name :SP12-SE3 Job Number :AK-XX-0901412968 Rig Name :Doyon 15 Field Name :Nikaitchuq Country :USA Survey Report SURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 316.50 0.00 0.00 N 0.00 E 0.00 0.00 40.83 0.00 316.50 40.83 0.00 N 0.00 E 0.00 0.00 114.22 0.46 338.08 114.22 0.27 N 0.11 W 0.27 0.63 129.82 0.50 332.13 129.82 0.39 N 0.17 W 0.39 0.41 159.83 0.54 330.96 159.83 0.63 N 0.30 W 0.63 0.14 191.44 0.87 309.86 191.44 0.92 N 0.55 W 0.92 1.31 221.82 1.39 327.30 221.81 1.37 N 0.93 W 1.37 2.03 252.46 1.10 327.34 252.44 1.93 N 1.29 W 1.93 0.95 283.44 1.79 323.97 283.41 2.57 N 1.73 W 2.57 2.24 314.47 2.82 309.39 314.42 3.45 N 2.61 W 3.45 3.79 345.15 3.90 312.14 345.04 4.63 N 3.96 W 4.63 3.56 389.81 5.33 314.45 389.56 7.10 N 6.57 W 7.10 3.23 451.49 7.51 317.76 450.85 12.09 N 11.33 W 12.09 3.58 544.38 11.58 314.38 542.43 23.11 N 22.08 W 23.11 4.42 636.94 13.40 315.27 632.80 37.23 N 36.26 W 37.23 1.98 730.31 16.67 317.72 722.96 54.83 N 52.89 W 54.83 3.57 823.74 20.61 319.33 811.47 77.23 N 72.63 W 77.23 4.25 917.05 25.09 320.44 897.44 104.95 N 95.95 W 104.95 4.82 1010.60 28.90 320.05 980.78 137.58 N 123.11 W 137.58 4.08 1103.96 32.09 320.42 1,061.22 174.00 N 153.40 W 174.00 3.42 1197.35 34.23 321.14 1,139.39 213.58 N 185.69 W 213.58 2.33 1290.72 35.84 317.40 1,215.85 254.15 N 220.68 W 254.15 2.87 1348.98 38.80 316.24 1,262.18 279.90 N 244.85 W 279.90 5.22 1442.46 42.12 316.19 1,333.29 323.69 N 286.82 W 323.69 3.55 1535.80 41.55 318.37 1,402.84 369.41 N 329.05 W 369.41 1.67 1628.84 40.33 316.32 1,473.13 414.25 N 370.35 W 414.25 1.95 1722.21 43.92 314.72 1,542.37 458.91 N 414.24 W 458.91 4.01 1815.64 45.47 313.91 1,608.78 504.81 N 461.26 W 504.81 1.77 1908.95 44.23 314.72 1,674.93 550.77 N 508.35 W 550.77 1.46 2002.39 42.88 314.61 1,742.65 596.03 N 554.14 W 596.03 1.45 INSITE V8.1.0 Page 1Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2095.82 40.71 316.69 1,812.30 640.54 N 597.68 W 640.54 2.76 2189.20 42.97 322.78 1,881.90 688.06 N 637.84 W 688.06 4.98 2282.60 43.58 329.94 1,949.94 741.31 N 673.24 W 741.31 5.29 2375.88 38.84 333.46 2,020.11 795.34 N 702.44 W 795.34 5.66 2469.25 33.76 333.07 2,095.33 844.70 N 727.28 W 844.70 5.45 2562.66 31.41 331.67 2,174.03 889.27 N 750.59 W 889.27 2.64 2656.08 25.78 332.63 2,256.02 928.77 N 771.50 W 928.77 6.05 2749.36 20.43 334.86 2,341.79 961.55 N 787.76 W 961.55 5.81 2801.15 19.87 344.66 2,390.43 978.22 N 793.93 W 978.22 6.60 2883.00 19.00 354.00 2,467.63 1,004.89 N 799.00 W 1004.89 3.94 2947.38 17.69 1.31 2,528.75 1,025.10 N 799.87 W 1025.10 4.11 2978.97 16.93 7.87 2,558.91 1,034.46 N 799.13 W 1034.46 6.63 3008.92 16.52 12.65 2,587.59 1,042.93 N 797.60 W 1042.93 4.79 3102.35 17.14 31.95 2,677.09 1,067.59 N 787.40 W 1067.59 5.99 3195.78 19.18 47.01 2,765.91 1,089.75 N 768.88 W 1089.75 5.46 3289.07 19.34 57.01 2,854.00 1,108.62 N 744.70 W 1108.62 3.54 3382.45 22.59 66.96 2,941.22 1,124.07 N 715.21 W 1124.07 5.15 3475.86 25.48 79.28 3,026.58 1,134.84 N 678.93 W 1134.84 6.18 3569.19 29.15 84.34 3,109.50 1,140.81 N 636.57 W 1140.81 4.65 3662.60 34.16 87.21 3,188.99 1,144.34 N 587.70 W 1144.34 5.60 3756.02 37.97 87.46 3,264.49 1,146.89 N 532.77 W 1146.89 4.08 3849.37 38.92 88.63 3,337.60 1,148.86 N 474.77 W 1148.86 1.28 3942.80 43.07 92.81 3,408.12 1,148.00 N 413.53 W 1148.00 5.32 4036.20 45.01 97.22 3,475.27 1,142.28 N 348.89 W 1142.28 3.88 4129.52 48.76 100.14 3,539.05 1,131.95 N 281.58 W 1131.95 4.62 4222.91 51.13 102.28 3,599.15 1,118.04 N 211.48 W 1118.04 3.08 4316.28 56.25 104.41 3,654.42 1,100.63 N 138.31 W 1100.63 5.78 4409.66 61.33 104.94 3,702.79 1,080.40 N 61.08 W 1080.40 5.46 4503.10 61.23 104.96 3,747.69 1,059.26 N 18.09 E 1059.26 0.11 4596.45 61.97 105.09 3,792.09 1,037.97 N 97.40 E 1037.97 0.80 4689.90 63.60 107.76 3,834.84 1,014.46 N 177.10 E 1014.46 3.08 4783.24 66.03 109.97 3,874.56 987.14 N 257.01 E 987.14 3.37 4876.70 69.54 112.85 3,909.89 955.54 N 337.53 E 955.54 4.72 4970.14 75.78 115.47 3,937.73 919.02 N 418.85 E 919.02 7.19 5063.50 77.75 118.14 3,959.11 878.04 N 499.94 E 878.04 3.49 5124.67 81.29 119.17 3,970.24 849.20 N 552.72 E 849.20 6.02 5207.00 84.00 120.50 3,980.77 808.58 N 623.54 E 808.58 3.66 5278.22 83.68 117.26 3,988.42 774.38 N 685.53 E 774.38 4.55 5372.30 83.88 117.24 3,998.61 731.56 N 768.68 E 731.56 0.21 5464.99 83.69 120.95 4,008.65 686.76 N 849.18 E 686.76 3.98 5558.46 86.30 127.58 4,016.81 634.36 N 926.08 E 634.36 7.60 5651.83 85.72 129.24 4,023.31 576.50 N 999.06 E 576.50 1.88 5745.32 86.88 128.79 4,029.34 517.77 N 1,071.55 E 517.77 1.33 5838.67 88.05 127.47 4,033.47 460.19 N 1,144.90 E 460.19 1.89 5932.03 88.05 127.17 4,036.65 403.62 N 1,219.11 E 403.62 0.32 INSITE V8.1.0 Page 2Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6025.43 88.08 126.95 4,039.80 347.36 N 1,293.60 E 347.36 0.24 6119.33 87.87 126.73 4,043.12 291.10 N 1,368.70 E 291.10 0.32 6212.23 89.36 126.79 4,045.37 235.52 N 1,443.10 E 235.52 1.61 6305.65 89.99 125.51 4,045.90 180.41 N 1,518.53 E 180.41 1.53 6399.08 91.89 125.49 4,044.36 126.17 N 1,594.58 E 126.17 2.03 6492.50 92.18 124.57 4,041.05 72.58 N 1,671.03 E 72.58 1.03 6585.85 91.75 123.56 4,037.85 20.32 N 1,748.32 E 20.32 1.18 6679.20 90.89 123.53 4,035.70 31.25 S 1,826.10 E -31.25 0.92 6772.60 89.61 124.72 4,035.29 83.65 S 1,903.41 E -83.65 1.87 6865.94 91.01 127.08 4,034.78 138.37 S 1,979.01 E -138.37 2.94 6959.32 88.30 125.40 4,035.34 193.57 S 2,054.32 E -193.57 3.41 7052.78 86.94 125.14 4,039.23 247.49 S 2,130.55 E -247.49 1.48 7146.24 88.89 126.01 4,042.63 301.82 S 2,206.52 E -301.82 2.28 7239.52 87.99 126.48 4,045.17 356.95 S 2,281.72 E -356.95 1.09 7333.36 88.64 125.26 4,047.93 411.91 S 2,357.73 E -411.91 1.47 7426.36 87.56 126.10 4,051.01 466.12 S 2,433.22 E -466.12 1.47 7519.77 87.73 124.66 4,054.85 520.16 S 2,509.32 E -520.16 1.55 7613.19 90.43 123.65 4,056.35 572.59 S 2,586.61 E -572.59 3.09 7706.58 90.28 124.48 4,055.77 624.90 S 2,663.97 E -624.90 0.90 7799.95 88.00 124.60 4,057.17 677.83 S 2,740.87 E -677.83 2.45 7893.46 86.63 125.04 4,061.55 731.17 S 2,817.55 E -731.17 1.54 7986.86 85.92 125.10 4,067.62 784.72 S 2,893.83 E -784.72 0.76 8080.15 89.09 126.12 4,071.68 838.98 S 2,969.59 E -838.98 3.57 8173.58 89.68 127.39 4,072.68 894.88 S 3,044.44 E -894.88 1.50 8267.03 90.20 128.95 4,072.78 952.63 S 3,117.91 E -952.63 1.76 8360.38 87.95 126.69 4,074.29 1,009.86 S 3,191.63 E -1009.86 3.42 8453.79 89.80 125.60 4,076.12 1,064.94 S 3,267.04 E -1064.94 2.30 8547.20 91.40 125.36 4,075.14 1,119.15 S 3,343.10 E -1119.15 1.73 8640.66 90.43 124.45 4,073.65 1,172.62 S 3,419.74 E -1172.62 1.42 8734.06 90.29 123.68 4,073.06 1,224.94 S 3,497.11 E -1224.94 0.84 8827.75 89.86 123.42 4,072.94 1,276.72 S 3,575.19 E -1276.72 0.54 8920.82 87.71 121.62 4,074.91 1,326.74 S 3,653.64 E -1326.74 3.01 9014.36 88.88 122.12 4,077.70 1,376.10 S 3,733.04 E -1376.10 1.36 9107.72 88.88 122.37 4,079.52 1,425.90 S 3,811.99 E -1425.90 0.27 9201.05 88.87 123.25 4,081.35 1,476.46 S 3,890.41 E -1476.46 0.94 9294.85 90.44 123.86 4,081.92 1,528.31 S 3,968.58 E -1528.31 1.80 9387.78 92.52 124.48 4,079.52 1,580.48 S 4,045.43 E -1580.48 2.34 9482.03 92.22 124.44 4,075.62 1,633.77 S 4,123.08 E -1633.77 0.32 9574.65 91.01 125.18 4,073.01 1,686.62 S 4,199.09 E -1686.62 1.53 9668.96 90.33 126.30 4,071.91 1,741.70 S 4,275.63 E -1741.70 1.39 9761.41 89.88 126.81 4,071.74 1,796.76 S 4,349.90 E -1796.76 0.74 9855.66 90.69 127.75 4,071.27 1,853.85 S 4,424.89 E -1853.85 1.32 9949.99 90.89 128.05 4,069.97 1,911.79 S 4,499.32 E -1911.79 0.38 10041.68 90.55 128.24 4,068.82 1,968.41 S 4,571.42 E -1968.41 0.42 10135.10 90.92 128.18 4,067.62 2,026.19 S 4,644.82 E -2026.19 0.40 INSITE V8.1.0 Page 3Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10228.46 90.96 128.10 4,066.09 2,083.84 S 4,718.24 E -2083.84 0.10 10321.95 88.67 126.56 4,066.39 2,140.53 S 4,792.57 E -2140.53 2.95 10415.28 88.91 126.64 4,068.36 2,196.16 S 4,867.48 E -2196.16 0.27 10508.70 90.16 126.57 4,069.12 2,251.87 S 4,942.47 E -2251.87 1.34 10602.11 90.27 126.11 4,068.77 2,307.22 S 5,017.71 E -2307.22 0.51 10695.44 90.71 125.43 4,067.97 2,361.77 S 5,093.43 E -2361.77 0.87 10788.87 89.75 124.55 4,067.60 2,415.35 S 5,169.97 E -2415.35 1.39 10882.34 88.40 125.48 4,069.10 2,468.97 S 5,246.51 E -2468.97 1.75 10975.78 87.85 125.79 4,072.16 2,523.38 S 5,322.41 E -2523.38 0.68 11069.14 88.53 124.62 4,075.11 2,577.17 S 5,398.66 E -2577.17 1.45 11162.53 90.59 125.16 4,075.83 2,630.59 S 5,475.26 E -2630.59 2.28 11255.91 90.39 125.31 4,075.03 2,684.46 S 5,551.53 E -2684.46 0.27 11349.32 90.39 125.30 4,074.39 2,738.44 S 5,627.75 E -2738.44 0.01 11442.68 90.46 124.75 4,073.70 2,792.02 S 5,704.20 E -2792.02 0.59 11536.12 90.29 124.63 4,073.09 2,845.20 S 5,781.03 E -2845.20 0.22 11629.49 90.85 124.30 4,072.16 2,898.04 S 5,858.01 E -2898.04 0.70 11723.21 87.95 123.15 4,073.14 2,950.06 S 5,935.94 E -2950.06 3.33 11816.23 87.98 123.85 4,076.44 3,001.37 S 6,013.46 E -3001.37 0.75 11910.06 90.90 124.15 4,077.36 3,053.83 S 6,091.24 E -3053.83 3.13 12003.49 89.64 122.66 4,076.92 3,105.27 S 6,169.23 E -3105.27 2.09 12096.80 91.07 123.30 4,076.34 3,156.06 S 6,247.50 E -3156.06 1.68 12190.26 91.89 123.24 4,073.93 3,207.31 S 6,325.61 E -3207.31 0.88 12283.71 90.20 123.84 4,072.23 3,258.93 S 6,403.49 E -3258.93 1.92 12377.14 91.90 125.46 4,070.51 3,312.04 S 6,480.33 E -3312.04 2.51 12470.48 91.44 125.47 4,067.79 3,366.17 S 6,556.32 E -3366.17 0.49 12564.36 91.41 125.83 4,065.46 3,420.87 S 6,632.58 E -3420.87 0.38 12657.28 90.59 127.57 4,063.84 3,476.39 S 6,707.07 E -3476.39 2.07 12750.61 92.12 129.67 4,061.63 3,534.62 S 6,779.96 E -3534.62 2.78 12843.97 90.64 129.28 4,059.38 3,593.96 S 6,852.00 E -3593.96 1.64 12937.32 90.75 128.66 4,058.25 3,652.66 S 6,924.57 E -3652.66 0.67 13031.68 90.20 128.38 4,057.47 3,711.43 S 6,998.40 E -3711.43 0.65 13126.02 90.48 127.83 4,056.91 3,769.64 S 7,072.63 E -3769.64 0.65 13217.36 90.77 127.26 4,055.91 3,825.30 S 7,145.05 E -3825.30 0.70 13310.79 90.83 127.33 4,054.61 3,881.91 S 7,219.37 E -3881.91 0.10 13404.21 90.68 127.14 4,053.38 3,938.43 S 7,293.74 E -3938.43 0.26 13498.65 90.38 126.62 4,052.50 3,995.10 S 7,369.28 E -3995.10 0.64 13591.01 89.51 125.59 4,052.59 4,049.53 S 7,443.90 E -4049.53 1.46 13684.40 89.71 124.91 4,053.23 4,103.42 S 7,520.16 E -4103.42 0.76 13777.77 89.82 124.24 4,053.61 4,156.41 S 7,597.04 E -4156.41 0.73 13871.21 88.97 124.81 4,054.60 4,209.36 S 7,674.02 E -4209.36 1.10 13964.69 87.72 124.75 4,057.30 4,262.66 S 7,750.76 E -4262.66 1.34 14058.03 87.17 124.47 4,061.46 4,315.63 S 7,827.51 E -4315.63 0.66 14151.09 89.72 125.12 4,063.98 4,368.71 S 7,903.89 E -4368.71 2.83 14244.44 89.78 124.20 4,064.39 4,421.79 S 7,980.68 E -4421.79 0.99 14337.87 90.44 123.33 4,064.21 4,473.72 S 8,058.34 E -4473.72 1.17 INSITE V8.1.0 Page 4Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14431.18 88.97 123.03 4,064.69 4,524.79 S 8,136.44 E -4524.79 1.61 14524.62 90.72 123.89 4,064.94 4,576.30 S 8,214.39 E -4576.30 2.09 14618.05 90.87 123.54 4,063.65 4,628.16 S 8,292.10 E -4628.16 0.41 14711.43 90.41 124.36 4,062.60 4,680.30 S 8,369.55 E -4680.30 1.01 14804.83 90.28 125.87 4,062.04 4,734.02 S 8,445.95 E -4734.02 1.62 14898.11 90.29 126.57 4,061.58 4,789.14 S 8,521.20 E -4789.14 0.75 14992.09 89.68 125.81 4,061.60 4,844.63 S 8,597.05 E -4844.63 1.04 15085.53 90.08 125.75 4,061.80 4,899.26 S 8,672.85 E -4899.26 0.43 15151.59 89.57 125.99 4,062.00 4,937.97 S 8,726.38 E -4937.97 0.85 15216.00 89.57 125.99 4,062.48 4,975.82 S 8,778.50 E -4975.82 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (True) - A total correction of 19.26 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 15,216.00 feet is 10,090.63 feet along 119.55 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.1.0 Page 5Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report WELL INFORMATION Created On : Aug 11 2014 Customer :ENI Petroleum Well Name :SP12-SE3 L1 Job Number :AK-XX-0901412968 Rig Name :Doyon 15 Field Name :Nikaitchuq Country :USA Survey Report SURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 316.50 0.00 0.00 N 0.00 E 0.00 0.00 40.83 0.00 316.50 40.83 0.00 N 0.00 E 0.00 0.00 114.22 0.46 338.08 114.22 0.27 N 0.11 W 0.27 0.63 129.82 0.50 332.13 129.82 0.39 N 0.17 W 0.39 0.41 159.83 0.54 330.96 159.83 0.63 N 0.30 W 0.63 0.14 191.44 0.87 309.86 191.44 0.92 N 0.55 W 0.92 1.31 221.82 1.39 327.30 221.81 1.37 N 0.93 W 1.37 2.03 252.46 1.10 327.34 252.44 1.93 N 1.29 W 1.93 0.95 283.44 1.79 323.97 283.41 2.57 N 1.73 W 2.57 2.24 314.47 2.82 309.39 314.42 3.45 N 2.61 W 3.45 3.79 345.15 3.90 312.14 345.04 4.63 N 3.96 W 4.63 3.56 389.81 5.33 314.45 389.56 7.10 N 6.57 W 7.10 3.23 451.49 7.51 317.76 450.85 12.09 N 11.33 W 12.09 3.58 544.38 11.58 314.38 542.43 23.11 N 22.08 W 23.11 4.42 636.94 13.40 315.27 632.80 37.23 N 36.26 W 37.23 1.98 730.31 16.67 317.72 722.96 54.83 N 52.89 W 54.83 3.57 823.74 20.61 319.33 811.47 77.23 N 72.63 W 77.23 4.25 917.05 25.09 320.44 897.44 104.95 N 95.95 W 104.95 4.82 1010.60 28.90 320.05 980.78 137.58 N 123.11 W 137.58 4.08 1103.96 32.09 320.42 1,061.22 174.00 N 153.40 W 174.00 3.42 1197.35 34.23 321.14 1,139.39 213.58 N 185.69 W 213.58 2.33 1290.72 35.84 317.40 1,215.85 254.15 N 220.68 W 254.15 2.87 1348.98 38.80 316.24 1,262.18 279.90 N 244.85 W 279.90 5.22 1442.46 42.12 316.19 1,333.29 323.69 N 286.82 W 323.69 3.55 1535.80 41.55 318.37 1,402.84 369.41 N 329.05 W 369.41 1.67 1628.84 40.33 316.32 1,473.13 414.25 N 370.35 W 414.25 1.95 1722.21 43.92 314.72 1,542.37 458.91 N 414.24 W 458.91 4.01 1815.64 45.47 313.91 1,608.78 504.81 N 461.26 W 504.81 1.77 1908.95 44.23 314.72 1,674.93 550.77 N 508.35 W 550.77 1.46 2002.39 42.88 314.61 1,742.65 596.03 N 554.14 W 596.03 1.45 INSITE V8.1.0 Page 1Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2095.82 40.71 316.69 1,812.30 640.54 N 597.68 W 640.54 2.76 2189.20 42.97 322.78 1,881.90 688.06 N 637.84 W 688.06 4.98 2282.60 43.58 329.94 1,949.94 741.31 N 673.24 W 741.31 5.29 2375.88 38.84 333.46 2,020.11 795.34 N 702.44 W 795.34 5.66 2469.25 33.76 333.07 2,095.33 844.70 N 727.28 W 844.70 5.45 2562.66 31.41 331.67 2,174.03 889.27 N 750.59 W 889.27 2.64 2656.08 25.78 332.63 2,256.02 928.77 N 771.50 W 928.77 6.05 2749.36 20.43 334.86 2,341.79 961.55 N 787.76 W 961.55 5.81 2801.15 19.87 344.66 2,390.43 978.22 N 793.93 W 978.22 6.60 2883.00 19.00 354.00 2,467.63 1,004.89 N 799.00 W 1004.89 3.94 2947.38 17.69 1.31 2,528.75 1,025.10 N 799.87 W 1025.10 4.11 2978.97 16.93 7.87 2,558.91 1,034.46 N 799.13 W 1034.46 6.63 3008.92 16.52 12.65 2,587.59 1,042.93 N 797.60 W 1042.93 4.79 3102.35 17.14 31.95 2,677.09 1,067.59 N 787.40 W 1067.59 5.99 3195.78 19.18 47.01 2,765.91 1,089.75 N 768.88 W 1089.75 5.46 3289.07 19.34 57.01 2,854.00 1,108.62 N 744.70 W 1108.62 3.54 3382.45 22.59 66.96 2,941.22 1,124.07 N 715.21 W 1124.07 5.15 3475.86 25.48 79.28 3,026.58 1,134.84 N 678.93 W 1134.84 6.18 3569.19 29.15 84.34 3,109.50 1,140.81 N 636.57 W 1140.81 4.65 3662.60 34.16 87.21 3,188.99 1,144.34 N 587.70 W 1144.34 5.60 3756.02 37.97 87.46 3,264.49 1,146.89 N 532.77 W 1146.89 4.08 3849.37 38.92 88.63 3,337.60 1,148.86 N 474.77 W 1148.86 1.28 3942.80 43.07 92.81 3,408.12 1,148.00 N 413.53 W 1148.00 5.32 4036.20 45.01 97.22 3,475.27 1,142.28 N 348.89 W 1142.28 3.88 4129.52 48.76 100.14 3,539.05 1,131.95 N 281.58 W 1131.95 4.62 4222.91 51.13 102.28 3,599.15 1,118.04 N 211.48 W 1118.04 3.08 4316.28 56.25 104.41 3,654.42 1,100.63 N 138.31 W 1100.63 5.78 4409.66 61.33 104.94 3,702.79 1,080.40 N 61.08 W 1080.40 5.46 4503.10 61.23 104.96 3,747.69 1,059.26 N 18.09 E 1059.26 0.11 4596.45 61.97 105.09 3,792.09 1,037.97 N 97.40 E 1037.97 0.80 4689.90 63.60 107.76 3,834.84 1,014.46 N 177.10 E 1014.46 3.08 4783.24 66.03 109.97 3,874.56 987.14 N 257.01 E 987.14 3.37 4876.70 69.54 112.85 3,909.89 955.54 N 337.53 E 955.54 4.72 4970.14 75.78 115.47 3,937.73 919.02 N 418.85 E 919.02 7.19 5278.32 83.39 104.76 3,993.56 815.35 N 702.93 E 815.35 4.21 5371.76 83.79 108.41 4,004.00 788.85 N 791.91 E 788.85 3.91 5465.15 85.32 111.30 4,012.86 757.27 N 879.34 E 757.27 3.49 5558.61 87.38 113.07 4,018.81 722.06 N 965.69 E 722.06 2.90 5651.98 86.78 115.45 4,023.57 683.75 N 1,050.70 E 683.75 2.63 5745.47 85.80 117.93 4,029.62 641.85 N 1,134.05 E 641.85 2.85 5838.82 86.99 120.42 4,035.49 596.43 N 1,215.38 E 596.43 2.95 5932.18 89.38 123.66 4,038.45 546.94 N 1,294.47 E 546.94 4.31 6025.58 89.47 125.07 4,039.38 494.22 N 1,371.56 E 494.22 1.51 6118.98 90.27 126.38 4,039.60 439.69 N 1,447.38 E 439.69 1.64 6212.38 90.27 127.50 4,039.16 383.56 N 1,522.03 E 383.56 1.20 INSITE V8.1.0 Page 2Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6305.80 90.80 124.87 4,038.28 328.41 N 1,597.42 E 328.41 2.87 6399.23 89.16 126.08 4,038.32 274.19 N 1,673.50 E 274.19 2.18 6492.65 86.87 127.81 4,041.55 218.08 N 1,748.11 E 218.08 3.07 6586.00 86.42 128.36 4,047.01 160.60 N 1,821.46 E 160.60 0.76 6679.35 87.07 127.82 4,052.31 103.11 N 1,894.81 E 103.11 0.90 6772.75 88.00 127.78 4,056.33 45.91 N 1,968.55 E 45.91 1.00 6866.09 88.61 128.91 4,059.09 11.97 S 2,041.72 E -11.97 1.38 6959.47 89.76 130.29 4,060.42 71.48 S 2,113.66 E -71.48 1.92 7052.93 87.84 129.30 4,062.38 131.28 S 2,185.45 E -131.28 2.31 7146.39 87.85 129.03 4,065.89 190.27 S 2,257.86 E -190.27 0.29 7239.67 89.12 126.04 4,068.36 247.07 S 2,331.79 E -247.07 3.48 7333.11 88.97 124.72 4,069.92 301.16 S 2,407.96 E -301.16 1.42 7426.51 89.82 126.74 4,070.90 355.70 S 2,483.77 E -355.70 2.35 7519.92 88.68 125.38 4,072.13 410.68 S 2,559.28 E -410.68 1.90 7613.34 88.96 125.38 4,074.05 464.75 S 2,635.43 E -464.75 0.30 7706.73 89.43 126.15 4,075.36 519.33 S 2,711.20 E -519.33 0.97 7800.10 89.87 124.63 4,075.93 573.40 S 2,787.31 E -573.40 1.69 7893.61 90.64 124.36 4,075.52 626.36 S 2,864.38 E -626.36 0.87 7987.01 90.96 124.01 4,074.21 678.83 S 2,941.64 E -678.83 0.51 8080.30 90.57 123.36 4,072.97 730.57 S 3,019.26 E -730.57 0.81 8173.73 91.16 123.17 4,071.56 781.81 S 3,097.37 E -781.81 0.66 8267.18 90.98 124.26 4,069.81 833.67 S 3,175.08 E -833.67 1.18 8360.53 90.46 124.55 4,068.64 886.41 S 3,252.10 E -886.41 0.64 8453.94 89.71 125.19 4,068.50 939.82 S 3,328.74 E -939.82 1.06 8547.35 90.03 126.47 4,068.71 994.49 S 3,404.47 E -994.49 1.41 8640.81 90.01 126.46 4,068.68 1,050.04 S 3,479.63 E -1050.04 0.02 8734.21 88.26 125.18 4,070.09 1,104.69 S 3,555.35 E -1104.69 2.32 8827.58 88.54 125.07 4,072.70 1,158.39 S 3,631.69 E -1158.39 0.32 8920.97 88.64 125.19 4,074.99 1,212.12 S 3,708.04 E -1212.12 0.17 9014.51 89.38 126.15 4,076.61 1,266.65 S 3,784.02 E -1266.65 1.30 9107.87 89.53 127.09 4,077.50 1,322.34 S 3,858.95 E -1322.34 1.02 9201.20 90.18 127.06 4,077.73 1,378.60 S 3,933.41 E -1378.60 0.70 9294.54 89.31 127.04 4,078.15 1,434.84 S 4,007.91 E -1434.84 0.93 9387.93 88.62 127.08 4,079.84 1,491.11 S 4,082.42 E -1491.11 0.74 9481.41 90.43 127.88 4,080.61 1,547.99 S 4,156.59 E -1547.99 2.12 9574.80 89.36 126.31 4,080.78 1,604.31 S 4,231.08 E -1604.31 2.03 9668.23 86.61 126.20 4,084.07 1,659.53 S 4,306.37 E -1659.53 2.95 9761.56 89.06 126.25 4,087.59 1,714.64 S 4,381.60 E -1714.64 2.63 9854.98 89.84 125.88 4,088.49 1,769.63 S 4,457.11 E -1769.63 0.92 9948.43 91.07 125.31 4,087.75 1,824.02 S 4,533.10 E -1824.02 1.45 10041.83 89.22 124.59 4,087.51 1,877.52 S 4,609.65 E -1877.52 2.13 10135.25 90.07 123.82 4,088.09 1,930.04 S 4,686.91 E -1930.04 1.23 10228.61 90.07 123.59 4,087.98 1,981.84 S 4,764.57 E -1981.84 0.25 10322.10 89.54 123.48 4,088.29 2,033.49 S 4,842.50 E -2033.49 0.58 10415.43 90.03 123.68 4,088.65 2,085.11 S 4,920.25 E -2085.11 0.57 INSITE V8.1.0 Page 3Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10508.85 90.30 125.22 4,088.38 2,137.96 S 4,997.29 E -2137.96 1.67 10602.26 89.89 125.99 4,088.22 2,192.34 S 5,073.23 E -2192.34 0.93 10695.59 89.35 123.58 4,088.84 2,245.58 S 5,149.88 E -2245.58 2.65 10789.02 90.77 126.72 4,088.74 2,299.36 S 5,226.26 E -2299.36 3.69 10882.49 92.21 127.12 4,086.31 2,355.49 S 5,300.96 E -2355.49 1.60 10975.93 92.98 127.22 4,082.08 2,411.88 S 5,375.34 E -2411.88 0.83 11069.29 92.33 126.36 4,077.76 2,467.73 S 5,450.02 E -2467.73 1.15 11162.68 92.16 125.79 4,074.10 2,522.68 S 5,525.45 E -2522.68 0.64 11256.06 90.19 125.35 4,072.18 2,576.99 S 5,601.38 E -2576.99 2.16 11349.47 89.79 125.53 4,072.20 2,631.15 S 5,677.49 E -2631.15 0.47 11442.83 89.58 125.70 4,072.71 2,685.52 S 5,753.38 E -2685.52 0.29 11536.27 90.01 127.05 4,073.05 2,740.93 S 5,828.61 E -2740.93 1.52 11629.64 90.98 126.84 4,072.24 2,797.05 S 5,903.23 E -2797.05 1.06 11723.09 91.31 126.21 4,070.37 2,852.66 S 5,978.31 E -2852.66 0.76 11816.48 90.57 126.24 4,068.84 2,907.84 S 6,053.64 E -2907.84 0.79 11910.21 89.98 125.51 4,068.39 2,962.76 S 6,129.59 E -2962.76 1.00 12003.64 89.91 125.36 4,068.48 3,016.93 S 6,205.71 E -3016.93 0.18 12096.95 89.86 125.10 4,068.67 3,070.76 S 6,281.93 E -3070.76 0.28 12190.41 88.45 124.57 4,070.05 3,124.14 S 6,358.63 E -3124.14 1.61 12283.86 87.51 124.85 4,073.34 3,177.32 S 6,435.41 E -3177.32 1.05 12377.29 86.80 123.71 4,077.98 3,229.87 S 6,512.51 E -3229.87 1.44 12470.63 87.12 124.52 4,082.93 3,282.15 S 6,589.68 E -3282.15 0.93 12564.07 89.17 124.64 4,085.95 3,335.15 S 6,666.56 E -3335.15 2.20 12657.43 91.23 124.85 4,085.63 3,388.36 S 6,743.27 E -3388.36 2.22 12750.76 90.44 125.04 4,084.27 3,441.81 S 6,819.77 E -3441.81 0.87 12844.12 90.40 124.74 4,083.58 3,495.21 S 6,896.34 E -3495.21 0.32 12937.47 90.32 124.57 4,083.00 3,548.29 S 6,973.13 E -3548.29 0.20 13030.86 90.90 125.20 4,082.00 3,601.70 S 7,049.73 E -3601.70 0.92 13124.14 90.68 125.50 4,080.72 3,655.66 S 7,125.81 E -3655.66 0.40 13217.51 90.42 125.31 4,079.82 3,709.76 S 7,201.91 E -3709.76 0.34 13310.94 90.38 125.30 4,079.17 3,763.75 S 7,278.15 E -3763.75 0.04 13404.36 91.12 125.31 4,077.95 3,817.74 S 7,354.39 E -3817.74 0.79 13497.80 90.24 125.44 4,076.84 3,871.83 S 7,430.57 E -3871.83 0.95 13591.16 90.18 125.44 4,076.49 3,925.96 S 7,506.63 E -3925.96 0.06 13684.55 89.83 125.04 4,076.49 3,979.85 S 7,582.91 E -3979.85 0.57 13777.92 89.30 125.16 4,077.19 4,033.53 S 7,659.30 E -4033.53 0.58 13872.08 92.40 125.52 4,075.80 4,087.98 S 7,736.09 E -4087.98 3.31 13964.84 92.74 123.82 4,071.64 4,140.70 S 7,812.30 E -4140.70 1.87 14058.18 92.10 123.45 4,067.70 4,192.35 S 7,889.94 E -4192.35 0.79 14151.93 90.96 122.72 4,065.19 4,243.51 S 7,968.46 E -4243.51 1.44 14244.59 91.44 123.47 4,063.25 4,294.09 S 8,046.07 E -4294.09 0.96 14338.02 92.62 124.62 4,059.94 4,346.36 S 8,123.43 E -4346.36 1.76 14431.33 90.48 123.95 4,057.42 4,398.90 S 8,200.50 E -4398.90 2.40 14524.77 89.61 124.86 4,057.35 4,451.70 S 8,277.59 E -4451.70 1.35 14618.20 90.49 126.02 4,057.27 4,505.87 S 8,353.71 E -4505.87 1.56 INSITE V8.1.0 Page 4Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14711.58 90.93 126.61 4,056.11 4,561.17 S 8,428.95 E -4561.17 0.79 14804.98 90.78 126.39 4,054.71 4,616.72 S 8,504.02 E -4616.72 0.29 14898.26 90.01 126.33 4,054.07 4,672.02 S 8,579.13 E -4672.02 0.83 14991.63 89.93 125.80 4,054.12 4,726.99 S 8,654.61 E -4726.99 0.57 15085.04 90.12 125.46 4,054.08 4,781.40 S 8,730.53 E -4781.40 0.42 15180.31 89.99 124.92 4,053.99 4,836.30 S 8,808.39 E -4836.30 0.58 15245.00 89.99 124.92 4,054.00 4,873.33 S 8,861.43 E -4873.33 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (True) - A total correction of 19.26 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 15,245.00 feet is 10,113.08 feet along 118.81 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.1.0 Page 5Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report