Technical Report Title
Date
Client: Eni Petroleum
Field: Nikaitchuq
Rig: Doyon 15
Date: July 25, 2014
Surface Data Logging
End of Well Report
SP12-SE3
SP12-SE3 L1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Formation Tops
6. Show Reports
7. Mud Record
8. Bit Record
9. Morning Reports
10. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: ENI Petroleum
Rig: Doyon 15
Well: SP12-SE3 & SP13-SE3 L1
Field: Nikaitchuq
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-629-23513-00-00 (SP12-SE3)
50-629-23513-60-00 (SP13-SE3 L1)
Sperry Job Number: AK-XX-0901412968
Job Start Date: 6 June 2014
Spud Date: 8 June 2014
Total Depth: 15,216’ MD, 4,063’ TVD (SP12-SE3)
15,245’ MD, 4,050’ TVD (SP12-SE3 L1)
North Reference: True
Declination: 19.260°
Dip Angle: 81.055°
Total Field Strength: 57623 nT
Date Of Magnetic Data: 6 June 2013
Wellhead Coordinates N: North 70° 33’ 28.067”
Wellhead Coordinates W: West 149° 54’ 16.167“
Drill Floor Elevation 53.93’
Ground Elevation: 13.10’
Permanent Datum: Mean Sea Level
SDL Engineers: Leigh Ann Rasher, Kori Jo Plowman
Doug Acker, Jane Grundin, Danielle Dawson
SDL Sample Catchers: Hilary Garney, Danielle Dawson, David Durst,
Megan Cardenas
Company Geologist: Andrew Buchanan
Company Representatives: Ben Perry, Jack Keener, Russ Wimmer, Mike
Ross, Oliver Amend
SSDS Unit Number: 110
DAILY SUMMARY
06/06/2014
SDL continued on location from previous well. Spott and set mudlogging shack. Wait on the
unit to warm up before rigging up. Rig up mudlogging unit. Nipple up diverter system and make
up hanger. Perform a dummy run and diverter test.
06/07/2014
Nipple up diverter stack and test. Rig up secondary kill line, kill well SI11 with 200 barrels of 9.6
ppg brine, and perform dummy run on 13 ⅜" hanger, install diverter pup. Rig up and bleed OA
pressure, rig down equipment. Perform diverter test. Load rig floor with BHA tools.
06/08/2014
Install skirt around stack, prepare handling equipment for BHA. Pick up BHA #1. Pre SPUD
meeting, flood conductor, test surface lines. Clean out conductor to 160 MD'. Pull out of hole to
33' MD and then picked up BHA #2. Troubleshoot MWD software. Shallow hole test Gyropulse /
MWD at 160' MD. Drill from 160' MD to 392' MD. Pump out of hole. Make up remaining BHA #2,
wash down to 392' MD. Drill from 392' MD to 1059’ MD.
Gas: The maximum gas was 37 units at 1023’ MD and the average gas was 9 units.
06/09/2014
Drill from 1059' MD to 2883' MD. Monitor static well. Back ream out of hole from 2883' MD to
2783' MD.
Gas: The maximum gas was 752 units at 1962’ MD and the average gas was 119 units.
06/10/2014
Backed ream out of hole as per K&M from 2783' MD to 406' MD. Pull out of hole from 406' MD
to 123' MD. Set back 2 stands of heavyweight drill pipe. Blow down the top drive. Lay down
BHA #2 as per SLB. Rig up Volant casing equipment. Make up 13 ⅜" shoe track to 121' MD
and test. Run in hole with casing to 1000' MD. Continue running in with casing from 1000' MD
to 1780' MD. Pull back to 1760' MD, would not go past 1780' MD. Attempt to break circulation
and pressure up to 650 psi with no returns (shoe plugged). Then attempted to free with 3000psi;
no returns. Rotate out of hole from 1760' MD to 1485' MD.
Gas: The maximum wiper gas was 798 units.
06/11/2014
Pull out of hole from 1485' MD to 82' MD with 13 ⅜" casing, laid down in pipe shed. Drain shoe
track and cut all connections, laid down same. Clean/clear rig floor, rig down Volant, laid down
GBR casing tongs, bring 15 ⅞" stab and 12 ¼" bit to floor. Clean rig floor. Lubricate rig. Pick up
and make up BHA #3 to 576' MD; trip in hole from 576' MD to 2817' MD. At 2817' MD break
circulation, wash down and tag bottom at 2883' MD. Back ream out of hole from 2883' MD to
1275' MD as per K&M
Gas: The maximum wiper/trip gas was 133 units.
06/12/2014
Back ream out of hole as per K&M from 1276' MD to 297' MD. Laid down BHA #3. Blow down
top drive, clean and clear rig floor. Rig up to run casing as per GBR. Run in hole to 2202' MD
with 13 ⅜" casing as per detail, fill and circulate every 10 joints. Continue to run in the hole with
casing from 2202' MD to 2837’ MD. Break circulation every 10 joints. Make up landing
joint/hanger, land at 2877' MD. Circulate and condition mud for cementing, weight up mud push.
Pump cement as per plan. Pressure test cement line, pump 103 barrels mud push, 469 barrels
lead slurry, 65 barrels tail slurry, chase with spud mud, bump plug at 405 barrels, with 75 barrels
cement returns. Rig down all equipment and rig down casing equipment.
Gas: No gas was observed.
06/13/2014
Nipple down surface stack and nipple up BOPE. Prepare surface hanger. Nipple up wellhead,
test connections to 2000 psi. Nipple high-psi riser. Nipple up BOP and test plug, perform BOP
and choke body test, rigged down test equipment (good test). Prepare to change saver sub and
install a new saver sub, load and process 5" drill pipe in shed. Lubricate rig. Continue to load
and process 5" drill pipe. Make up stands and rack back.
Gas: No gas was observed.
06/14/2014
Make up stands of 5" drill pipe and rack back in derrick. Rig up and begin testing BOPE.
Change out upper seals on pipe rams. Change out upper and lower IBOP's. Rig up to test BOP.
BOP test, witness waived by Jonnie Hill with AOGCC. Test completed successfully. Pull test
plug & set wear bushing. Break down and rig down test equipment. Rig up and test 13 ⅜"
casing to 2500psi. Break down and rig down test equipment. Pick up and make up BHA #4.
Gas: No gas was observed.
06/15/2014
Pick up BHA #4 as per SLB. Run in hole from 655' MD to 2534’ MD. Shallow hole test at 1500'
MD. Wash and ream from 2534' MD to 2795' MD. Drill out float equipment, shoe track and 22'
of new hole to 2905' MD. Displace to 9.25 ppg LSND, pump 45 barrels of high viscosity spacer,
410 barrels of LSND. Blow down top drive. Cut and slip drill line, inspect brakes. Circulate
bottoms up for formation integrity test, recip. from 2814' MD to 2721' MD. Rig up and perform
leak off test to 10.6ppg equivalent mud weight. Break circulation and wash and ream from 2814'
MD to 2905' MD. Drill from 2905' MD to 3247' MD, 2815' TVD.
Gas: The maximum gas was 52 units at 3268’ MD and the average gas was 23 units.
Geology: Samples consisted of 100% clean sandstone.
06/16/2014
Continue to drill from 3268' MD to 4215' MD. 2815' TVD
Gas: The maximum gas was 22 units at 3980’ MD and the average gas was 12 units.
Geology: Samples consisted of 90% sandstone with 10% siltstone.
06/17/2014
Continue to drill 12.25 '' hole; TD intermediate section at 5207' MD. Circulating and back
reaming out of hole.
Gas: The maximum gas was 988 units at 4806’ MD and the average gas was 83 units
Geology: Samples consisted of 100% clean well sorted sandstone
06/18/2014
Circulate bottoms up two times. Rack stands back from 5165' MD to 5056' MD. Back ream out
of hole at 850 gpm, 1400 psi & 80 rpm to 2878' MD. At 4175' MD and 3217' MD, work through
twice with no pump psi increase. At 3217' MD to 2878' MD; 4" to 5" clay returns observed and
circulated bottoms up 4.5 times from 2878' MD to 2627' MD. Monitor well to be static for 10
minutes. Pull out of the hole to 2160’ MD. Pumped 25 barrels 11.4 lb/gal dry job. Laid down
BHA #4.
Gas: The maximum gas was 190 units.
06/19/2014
Float 9 ⅝" casing to 126' MD. Test floats successfully. Run in hole with casing from 126' MD to
5192' MD. Rig down Tesco equipment and rig up cement head. Fill casing at 3 bpm. Cement
Job:105 bbls MudPush, 79.5 barrels 12.5 lb/gal lead cement and 51 barrels 15.8 lb/gal tail
cement.
Gas: The maximum gas was 172 units.
06/20/2014
Nipple down BOP. Set e-slips and cut 9⅝” casing. Nipple up BOP and test BOP. Test 9 ⅝”
casing to 3000 psi for 30 minutes. Pick up BHA #5
Gas: The maximum gas was 0 units.
06/21/2014
Run in hole with BHA #5. Shallow hole test MWD tools. Continue to run in hole. Displace from
LSND mud to FazePro mud. Drill out shoe and 20’ of new hole. Drill ahead to 6203’ MD.
Gas: The maximum gas was 2341 units.
Geology: Samples consisted of 100% clean sandstone
06/22/2014
Drill 8.75” hole from 6203’ MD to 8296’ MD
Gas: The maximum gas was 2272 units.
Geology: Samples consisted of 100% clean sandstone
06/23/2014
Continue to drill 8.75” hole from 8296’ MD to 10803’ MD.
Gas: The maximum gas was 2651 units.
Geology: Samples consisted of 100% clean sandstone
06/24/2014
Continuing to drill 8.75” hole from 10803’ MD to 12110’ MD.
Gas: The maximum gas was 2964 units.
Geology: Samples consisted of 100% clean sandstone
06/25/2014
Continue to drill 8.75” hole from 12110’ MD to 14306’ MD.
Gas: The maximum gas was 3420 units.
Geology: Samples consisted of 100% clean sandstone
06/26/2014
Continue to drill 8.75” hole from 14306’ MD to 15216’ MD. TD production section. Backream out
of hole
Gas: The maximum gas was 3166 units.
Geology: Samples consisted of 100% clean sandstone
06/27/2014
Continue to backream out of hole
Gas: The maximum gas was 17 units.
06/28/2014
Continue to backream out of hole. Lay down BHA #5. Rig up liner equipment and run in hole
with 5 ½” liner
Gas: The maximum gas was 7 units.
06/29/2014
Continue to run in the hole with 5 ½” liner. Pick up power tongs, make up seal assembly, and
set slim pulse in collar. Make up one stand of 5” drill pipe. Shallow test MWD. Clean pump
room. Run in hole with 5” drill pipe. Orient MWD and hanger. Tag bottom and pick up to 15205’
MD. Set hanger and test.
Gas: The maximum gas was 8 units
06/30/2014
Unsting from top of liner. Pull out of hole 3 stands. Cut and slip drill line. Service rig. Pull out of
hole and lay down running tool. Pick up Whipstock BHA #6 and run in hole to 4922’ MD. Orient
Whipstock to 5064’ MD and set.
Gas: The maximum gas was 12 units.
07/01/2014
Mill 8 ¾” window in 9 ⅝” casing from 4992’ MD to 5032’ MD. Pump sweep, monitor well and
pump dry job. Pull out of hole and lay down BHA. Service rig. Pick up BHA #7 and run in hole.
Perform formation integrity test to 13.0 ppg. Orient MWD and motor.
Gas: The maximum gas was 18 units and the average gas was 14 units.
07/02/2014
Continue to drill from 5031’ MD to 5232’ MD. Circulate bottoms up three times and pull out of
hole. Laydown BHA, rig up and test BOP. Pick up BHA #8 and run in hole.
Gas: The maximum gas was 48 units and the average gas was 25 units.
Geology: Samples consisted of 90% siltstone and 10% sandstone.
07/03/2014
Run in hole with BHA. Shallow hole test MWD, Ecoscope failure. Pull out of hole and change
out Ecoscope. Run in hole and MAD Pass from 5030’ MD to 5232’ MD. Drill ahead to 7096’ MD.
Gas: The maximum gas was 1954 units and the average gas was 629 units.
Geology: Samples consisted of 100% clean sandstone.
07/04/2014
Drill ahead from 7096’ MD to 9745’ MD.
Gas: The maximum gas was 2204 units and the average gas was 975 units.
Geology: Samples consisted of 100% clean sandstone.
07/05/2014
Drill ahead from 9745’ MD to 12387’ MD.
Gas: The maximum gas was 2756 units and the average gas was 1183 units.
Geology: Samples consisted of 100% clean sandstone.
07/06/2014
Drill ahead from 12387’ MD to 13775’ MD.
Gas: The maximum gas was 2246 units and the average gas was 1160 units.
Geology: Samples consisted of 100% clean sandstone.
07/07/2014
Drill ahead from 14775’ MD to TD at 15245’ MD. Begin backreaming out of hole.
Gas: The maximum gas was 2063 units and the average gas was 1554 units.
Geology: Samples consisted of 100% clean sandstone.
07/08/2014
Backream out of hole from 9922’ MD to 5117’ MD. Work DS through tight spots and pack offs to
5462’ MD. Reduce RPM and continue backreaming out of hole, working BHA across whipstick
slide.
Gas: The maximum gas was 139 units and the average gas was 10 units.
07/09/2014
Backream out of hole from 4800’ MD to 3476’ MD. Circulate bottoms up twice. Pull out of hole
from 3476’ MD to 957’ MD. Pull out of hole from 957’ MD to 397’ MD. Lay down BHA #9 and
clean rig floor. Pick up HWDP and make up BHA #1B as per Baker Hughes. Trip in hole with
BHA #1B from 490’ MD to 1421’ MD.
Gas: The maximum gas was 137 units and the average gas was 9 units.
07/10/2014
Pull out of hole from 4940’ MD to 490’ MD. Laid down BHA #1B, no whipstock on hook. Make
up BHA #1B. Trip in hole from 491’ MD to 1518’ MD. Shallow hole test MWD tools. Trip in hole
from 4942’ MD to whipstock slide at 5002’ MD. Pull up and observe hook latch at 4996’ MD. Jar
whipstock free. Slight static loss. Drop ball rod at 4941’ MD and pick up to 4911’ MD. Pull out of
hole from 4942’ MD to 490’ MD.
Gas: The maximum gas was 6 units and the average gas was 2 units.
07/11/2014
Lay down Whipstock Retrieval BHA and clean rig floor. Make up Baker cleanout BHA to 454'
MD run in hole from 454' MD to 4937' MD washing down to 5051' MD observe top of liner
hanger. Wash down to 5078' MD increasing flow rate. Wash up to 4990' MD. Circulate bottoms
up @400 GPM. Pull out of hole from 4937' MD to 80' MD Laid Cleanout BHA As per Baker Rep.
Clean BHA. Load Comp. Tools and MWD in Shed. Make up Diverter with hanger seal
assembly. Stage up pumps to verify tool release. Test was Unsuccessful. Prepare well for well
control and wait on replacement diverter.
Gas: The maximum gas was 5 units and the average gas was 2 units.
07/12/2014
Make up BHA and run in the hole with seal assembly on 5" DP. From 150' MD to 4917' MD.
With shallow hole test @ 1500' MD Was down from 4917' MD to 5086' MD Verify Anchor latch
up. Release tool. Monitor well. Static; Pulled out of hole from 5086' MD to 65' MD. Loaded
casing tools and make up liner shoe. Run in the hole with 5.5' Liner to 3292' MD. 80 Jts Run.
07/13/2014
Run in hole with 5.5" Liner from 3292' MD to 10176' MD Entry into SBD At 4985' MD with
Window Exit at 5007' MD Pick up and make up ported crossover with Volant tool. Make up RAM
liner Hanger. Make up Bumper sub and crossover. Run in hole to to 15093' MD. Break
Circulation. Wash down to 15183' MD. Observe drop into Alignment slot. Drop Setting Ball.
Picked up to Ensure Ram is Set. Top at 4981' MD. Shoe at 15200' MD. Displace 9.2+ OBM
w/9.1+ Brine. Pulled out of hole on Elevators and laid down liner running tools. Serviced brake
liner packer.
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
16000
0 5 10 15 20 25 30 35 40
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
WELL NAME: SP12-SE3 & SP12-SE3 L1
OPERATOR: ENI Petroleum
MUD CO: MI Swaco
RIG: Doyon 15
SPERRY JOB: AK-XX-0901412968
Days vs. Depth
06 June 2014
Sperry SDL continue on location
from previous well
LOCATION: Spy Island
AREA: North Slope Borough
STATE: Alaska
SPUD: 8-Jun-2014
TD: 7-Jul-2014
Commenced 16.0" Surface Hole Section
On Bot: 01:40 8 Jun 2014
TD Surface Hole Section
2883' MD, 2465' TVD
Off Bot: 22:00 9 Jun 2014
Landed 13.375" Casing
2878' MD, 2463' TVD
12 Jun 2014
Commenced 12.25" Intermediate Hole Section
On Bot: 16:08 15 Jun 2014
TD Intermediate Hole Section
5207' MD, 3981' TVD
Off Bot: 22:34 17 Jun 2014
Landed 9.625" Casing
5193' MD, 3980' TVD
19 Jun 2014
Commenced 8.75" Production
Hole Section
On Bot: 14:45 21 Jun 2014
TD Production Hole Section
15216' MD, 4063' TVD
Off Bot: 13:10 26 June 2014
TD Production Hole Section
15245' MD, 4050' TVD
Off Bot: 02:58 07 Jul 2014
POOH for Ecoscope
MWD tool failure
03 Jul 2014
Drill 8.75" hole to 5232' MD
POOH to test BOPs
02 Jul 2014
Commenced 8.75" L1
Production Hole Section
On Bot: 07:10 01 Jul 2014
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:Doyon 15 HOLE SECTION:Surface
EMPLOYEE NAME:DATE:
Recommendations:
Have a standard for swapping out computers.
Innovations and/or cost savings:
N/A
Douglas Acker 19-Jun-2014
What went as, or better than, planned:
Rigging up after the rig move went as well as planned
Difficulties experienced:
After changing out the Iris and 4th computer everything seemed to be working as it should until we tried
to connect Wits to SLB. As usual we went through and double checked the screen shots to make sure
everything was set up as it was before. After working on the issue for several hours I thought it might be
a network issue. I double checked the settings and everything looked ok. I thought maybe there was a
communication issue with the new computer since I used the same IP address as before. I changed
them to a new IP address that was not in use and that solved the problem.
SP12-SE3 Spy Island
ENI Petroleum North Slope Borough
AK-XX-0901412968 Alaska
Surface Data Logging
After Action Review
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:Doyon 15 HOLE SECTION:Intermediate
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
AK-XX-0901412968 Alaska
SP12-SE3 Spy Island
ENI Petroleum North Slope Borough
Danielle Dawson 21-Jun-2014
What went as, or better than, planned:
During the section, all of the gas gear performed as required without any problems. Also, the
networking problem with not being able to connect to SLB's WITSed data was resolved, and no further
issues were encountered.
Difficulties experienced:
As experienced previously, Insite was having issues tracking depths. During connections, it was not
switching in and out of slips correctly, so that after a connection had been made, the bit depth was
off by one stand causing about 90 feet of lost gas data.
Recommendations:
The bit depth needs to be manually corrected after each correction to reflect the actual depth.
Innovations and/or cost savings:
N/A
Surface Data Logging
After Action Review
Surface Data Logging
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:Doyon 15 HOLE SECTION:Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
Recommendations:
The network issue with Insite should be resolved ASAP so we can get back to using Insite as we
normally do. Make sure all crew members check pump configurations before starting each well to
avoid having wrong liner ID's, etc. It is important for trainees to beaware of the bit depth while making
a connection to avoid having to make depth corrections. Also make sure to keep an eye on the
chromatograph while drilling to make sure it does not stop cycling while drilling.
Innovations and/or cost savings:
N/A
Leigh Ann Rasher 26-Jun-2014
What went as, or better than, planned:
No major issues were experienced with gas equipment.
Difficulties experienced:
Insite software ran super slow on all computers except the ADI. We had to use the ADI for most Insite
operations (adding comments, data statistics, etc) due to this problem. WITs froze several times a day
while drilling and had to be completely shut down and restarted. We think the WITs issue has to do
with the Insite issues. Pump 3 configuration had to be corrected due to lag being off when using pump
3. The bit tracker unnoticably got stuck in slips a few times during connections causing depth
corrections to be made. The chromatograph also stopped cycling by itself and had to be restarted
once or twice while drilling.
SP12-SE3 Spy Island
ENI Petroleum North Slope Borough
AK-XX-0901412968 Alaska
Surface Data Logging
After Action Review
Surface Data Logging
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:Doyon 15 HOLE SECTION:Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
Recommendations:
Continue to monitor going in and out of slips and adjust when needed.
Innovations and/or cost savings:
Near the end of the well the block weight, the hookload threshold and the block speed was
changed allowing Insite to track slips, and therefore depth, much better than before.
7-Jul-2014
What went as, or better than, planned:
Sample collection went well with no problems. Regular maintenance and properly installed equipment
did not result in condensation causing issues with the gas gear. Filters were changed on the shaky
panel and have been filtering out more water from the lines. Did not experience the networking
problems encountered previously with the SLB MWD data.
Difficulties experienced:
Chromatograph lost connection with computer from 12,331-12,368'. Insite was having difficulty
tracking depth and going in and out of slips at inapproriate time, necessitating manual bit depth
corrections. Also, an Insite problem causing block height trace and pit trace display issues on the
time log has occurred.
Megan Cardenas, Danielle
Dawson
SP12-SE3 L1 Spy Island
ENI Petroleum North Slope Borough
AK-XX-0901412968 Alaska
Surface Data Logging
After Action Review
Surface Data Logging
WELL NAME:SP12-SE3 & SP12-SE3 L1 LOCATION:Spy Island
OPERATOR:ENI Petroleum AREA:North Slope Borough
MUD CO:MI Swaco STATE:Alaska
RIG:Doyon 15 SPUD:8-Jun-2014
SPERRY JOB:AK-XX-0901412968 TD:7-Jul-2014
Marker MD INC AZ TVD TVDSS
16" Surface Borehole
SV-4 777.0 18.6 318.6 767.9 -714.0
SV-3 1,172.0 33.7 321.0 1,118.9 -1,065.0
SV-2 1,503.0 41.8 317.6 1,378.8 -1,324.9
Permafrost Base 2,038.0 42.0 315.4 1,768.9 -1,715.0
SV-1 2,263.0 43.4 328.5 1,936.1 -1,882.2
Ugnu Top (UG4)2,658.0 25.7 332.7 2,258.2 -2,204.3
12 1/4" Intermediate Borehole
UG-2 Coal Bed Marker 3,225.0 19.2 50.2 2,793.8 -2,739.9
Lower Ugnu 4,072.0 46.4 98.4 3,500.4 -3,446.5
Schrader Bluff 4,556.0 61.7 105.0 3,773.0 -3,719.1
N Sequence Top 4,623.0 62.4 105.9 3,804.5 -3,750.6
N Sand Top 4,711.0 64.2 108.3 3,844.1 -3,790.2
N-2 Top 4,746.0 65.1 109.1 3,859.2 -3,805.3
N-3 Top 4,762.0 65.5 109.5 3,865.9 -3,812.0
N Sand Bottom 4,855.0 68.7 112.2 3,902.1 -3,848.2
N Sequence Base 5,029.0 77.0 117.2 3,951.5 -3,897.6
8 3/4" Lateral Leg
OA Sand Top 5,519.0 76.8 116.9 4,014.3 -3,960.4
OA-2 5,600.0 86.0 128.3 4,020.2 -3,966.3
OA-3 5,689.0 86.2 129.1 4,026.2 -3,972.3
OA-3 6,543.0 92.0 124.0 4,039.8 -3,958.9
OA-2 6,643.0 91.2 123.5 4,037.0 -3,983.1
OA-2 7,858.0 87.2 124.9 4,060.0 -4,006.5
OA-3 7,961.0 86.1 125.1 4,066.4 -4,012.5
OA-3 9,547.0 91.4 125.0 4,074.3 -4,020.4
OA-2 9,605.0 90.8 125.5 4,073.1 -4,019.2
OA-2 10,875.0 88.5 125.4 4,069.5 -4,015.6
OA-3 11,018.0 88.2 125.3 4,074.0 -4,020.1
OA-3 12,382.0 91.9 125.5 4,070.9 -4,017.0
OA-2 12,498.0 91.4 125.6 4,067.6 -4,013.7
OA-2 13,856.0 89.1 124.7 4,054.9 -4,001.0
OA-3 14,046.0 87.2 124.5 4,061.4 -4,007.5
8 3/4" L1 Lateral Leg
OA-Sand Top 5,710.0 86.2 117.3 4,023.1 -3,969.2
OA-2 6,546.0 86.6 128.1 4,040.7 -3,986.8
OA-3 6,670.0 87.0 127.9 4,047.9 -3,994.0
OA-3 8,022.0 90.6 124.7 4,069.9 -4,016.0
OA-2 8,193.0 91.1 123.2 4,068.2 -4,014.2
OA-2 9,405.0 89.0 127.3 4,076.5 -4,022.6
OA-3 9,652.0 87.2 126.1 4,079.6 -4,025.7
OA-3 10,966.0 92.9 126.8 4,078.9 -4,025.0
OA-2 11,042.0 92.5 126.5 4,075.3 -4,021.4
OA-2 12,295.0 87.5 124.8 4,070.1 -4,016.2
OA-3 12,406.0 86.9 123.9 4,075.8 -4,021.9
OA-3 13,975.0 92.6 123.7 4,067.5 -4,013.6
OA-2 14,237.0 91.4 123.4 4,059.8 -4,005.8
TD 8 3/4" L1 lateral 15,245.0 90.0 124.9 4,049.8 -3,995.8
Formation Tops
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
No
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Show Report Report # 1
SP12-SE3 5655 7090
Spy Island 4024 4041
ENI Petroleum
Kori Jo Plowman OA Sands
Andrew Buchanan 6/27/2014
Interpretation:
This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to
very fine grain, subangulat to subrounded, well sorted, quartz sand. There is no free oil in the sample, trace dull yellow to white sample flourescence,
streaming or blooming dull yellow cut fluorescence, clear cut, a light amount of clear residual ring, and dull yellow to white residual flourescence ring.
Cuttings Analysis:
Odor none Fluorescence Cut Fluorescence Residual Cut
clr
Color Intensity dull Color yel Residual Flourescence
none-fnt
Amount none Distribution pchy Intensity dull Color
Stain Amount tr Type stmg-bloom Amount
yel-wh
Oil Show Rating Free Oil in Mud
dull
Color clr Color
Cut Color yel-wh Intensity
214865 6259 208606 1003
1 Hydrocarbon Ratios
5655 Gas Units 1937 Mud Chlorides (mg/L) =80000
142 16 126 4346
222 14 208 2065
110 9 101 1656
51 3 48
2
6044 Gas Units 2227 Mud Chlorides (mg/L) =78000
252437 7911 244526 867
307 25 282 1430
Hydrocarbon Ratios
188 17 171 944
293 34 259 2374
76000
256058 9582 246476 742
116 13 103
3
394 62 332 1018
298 56 242 698
6405 Gas Units 2272 Mud Chlorides (mg/L) =
4
7090 Gas Units 2035 Mud Chlorides (mg/L) =
494 141 353 1408
202 27 175
78000
219185 2011 217174 674
322 0 322 905
188 8 180
247 7 240 553
412 19 393 1207
Oil
Gas
NPH
NPH
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
No
Depth ft C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Leigh Ann Rasher OA Sands
Andrew Buchanan 6/23/2014
Interpretation:
This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to
very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform dull yellow sample flourescence, a dull
yellow streaming flourescence cut, straw to light amber cut, a light amount of pale straw to light amber residual ring, and dull yellow residual
fluorescence ring.
Show Report Report # 2
SP12-SE3 7700 8900
Spy Island 4055 4074
ENI Petroleum
1 Hydrocarbon Ratios
7724 Gas Units 2093 Mud Chlorides (mg/L) =76000
Amount 100%
even
dull
yel
Distribution
2
436 82 354 1649
305 30 275 984
252 29 223 620
264394 7656 256738 800
348 27 321 1131
8674 Gas Units 2424 Mud Chlorides (mg/L) =72000
234 104 130
Hydrocarbon Ratios
270 57
133
233722 14341 219381 798
4
8837 Gas Units 2651 Mud Chlorides (mg/L) =72000
1366
221 33 188
261 34 227 711
3
213 664
490 150 340 1737
287726 9308 278418 884
467 106 361
237308 11516 225792 875
313 55 258 1060
8131 Gas Units 2144 Mud Chlorides (mg/L) =75000
203 70
Residual Cut
strmg
dull
yel
Fluorescence
0.00
Cuttings Analysis:
533 136 397 1961
251 109 142
358 43 315 1136
293 48 245 701
Color
Free Oil in Mud
Intensity
Color
none
none
straw-lt amb
Cut Fluorescence
Oil Show Rating
wh
Intensity
Color
Odor
Stain
Color
Amount
Cut
Color
ltAmount
ambColor
Residual Flourescence
dull
Type
Intensity
1
10
100
1000
Oil
Gas
NPH
NPH
1.0
10.0
100.0
1000.0
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
No
Depth ft C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Leigh Ann Rasher OA Sands
Andrew Buchanan 6/23/2014
Interpretation:
This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to
very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform dull yellow sample flourescence, a dull
yellow streaming flourescence cut, pale straw to light amber cut, a light amount of amber residual ring, and dull white residual fluorescence ring.
Show Report Report # 3
SP12-SE3 9100 10900
Spy Island 4079 4069
ENI Petroleum
1 Hydrocarbon Ratios
9119 Gas Units 2296 Mud Chlorides (mg/L) =70000
Amount 100%
even
dull
yel
Distribution
2
508 222 286 2399
312 70 242 1270
263 76 187 830
271389 18612 252777 1114
286 59 227 1470
10240 Gas Units 2410 Mud Chlorides (mg/L) =66000
278 145 133
Hydrocarbon Ratios
273 53
99
250863 13376 237487 981
4
10852 Gas Units 2306 Mud Chlorides (mg/L) =62000
1337
235 46 189
229 57 172 926
3
220 754
532 181 351 1990
256553 12481 244072 1135
445 172 273
276379 11653 264726 932
327 43 284 1203
9403 Gas Units 2558 Mud Chlorides (mg/L) =70000
255 156
Residual Cut
strmg
dull
yel
Fluorescence
0.00
Cuttings Analysis:
306 115 191 3487
173 103 70
255 40 215 2068
152 34 118 1278
Color
Free Oil in Mud
Intensity
Color
none
none
pl straw
Cut Fluorescence
Oil Show Rating
wh
Intensity
Color
Odor
Stain
Color
Amount
Cut
Color
ltAmount
ambColor
Residual Flourescence
dull
Type
Intensity
1
10
100
1000
Oil
Gas
NPH
NPH
1.0
10.0
100.0
1000.0
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
No
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Show Report Report # 4
SP12-SE3 L1 5232'7200'
Spy Island 3962'3760'
ENI Petroleum
Danielle Dawson OA Sands
Andrew Buchanan 7/8/2014
Interpretation:
This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to
very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform dull yellow sample flourescence, a dull
yellow streaming flourescence cut, pale straw cut, a light amount of amber residual ring, and dull to bright white residual fluorescence ring.
Cuttings Analysis:
Odor fnt Fluorescence Cut Fluorescence Residual Cut
med-lt straw
Color brn Intensity dul Color yel Residual Flourescence
none-fnt
Amount tr Distribution uni Intensity dul Color
Stain Amount 30%Type stmg Amount
yel
Oil Show Rating Free Oil in Mud
bri
Color pl straw Color
Cut Color yel Intensity
167515 23817 143698 604
1 Hydrocarbon Ratios
6311 Gas Units 1426 Mud Chlorides (mg/L) =69000
315 112 203 2024
311 73 238 1005
197 54 143 708
125 54 71
2
6747 Gas Units 1705 Mud Chlorides (mg/L) =69000
196075 65079 130996 609
308 93 215 757
Hydrocarbon Ratios
250 77 173 487
429 160 269 1394
69000
222128 3752 218376 581
179 85 94
3
376 0 376 786
296 18 278 469
6886 Gas Units 1954 Mud Chlorides (mg/L) =
4
6970 Gas Units 1923 Mud Chlorides (mg/L) =
509 43 466 1050
214 6 208
69000
217376 223 217153 646
336 0 336 698
239 0 239
311 0 311 398
554 8 546 909
Oil
Gas
NPH
NPH
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Yes
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
240 138 102
234 64 170 602
466 183 283 1671
69000
198463 28039 170424 782
279 61 218 1002
4
8933 Gas Units 1768 Mud Chlorides (mg/L) =
432 140 292 722
225 43 182
222 32 190 773
211 41 170 450
7960 Gas Units 1628 Mud Chlorides (mg/L) =69000
139349 7996 131353 691
302 225 77
3 Hydrocarbon Ratios
331 211 120 520
636 432 204 1378
69000
245422 139349 106073 676
379 222 157 884
298 146 152
2
7997 Gas Units 2204 Mud Chlorides (mg/L) =
625 234 391 1249
350 96 254 805
334 98 236 486
242308 52411 189897 748
1 Hydrocarbon Ratios
8001 Gas Units 1717 Mud Chlorides (mg/L) =69000
yel
Oil Show Rating Free Oil in Mud
dul
Color pl-med straw Color
Cut Color yel-wh Intensity
pl straw
Color Intensity br Color yel Residual Flourescence
none-fnt
Amount none Distribution uni Intensity dull Color
Stain Amount abd Type stmg Amount
Cuttings Analysis:
Odor fnt Fluorescence Cut Fluorescence Residual Cut
Andrew Buchanan 7/8/2014
Interpretation:
This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to
very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform bright yellow or white sample
flourescence, a dull yellow streaming flourescence cut, pale to medium straw cut, a clearr residual ring, and dull white residual fluorescence ring.
Show Report Report # 5
SP12-SE3 L1 7200'9200'
Spy Island 3760'3554'
ENI Petroleum
Danielle Dawson OA Sands
Oil
Gas
NPH
NPH
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
No
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Show Report Report # 6
SP12-SE3 L1 9200'11200'
North Slope 3554'3347'
ENI Petroleum
Danielle Dawson OA Sands
Andrew Buchanan 7/8/2014
Interpretation:
This interval displays a good oil show, but is not associated with any heavy hydrocarbon gases. It is dominated by unconsolidated, fine to very fine
grain, subrounded to subangular, well sorted, quartz sand. It is slightly silty in part. There is free oil in the sample with a very faint oil odor, uniform dull
orange sample flourescence, an immediate bright blue bursting to streaming flourescence cut, bright greenish yellow residual ring flourescence, and
no visible residual ring.
Cuttings Analysis:
Odor none Fluorescence Cut Fluorescence Residual Cut
pl-med straw
Color Intensity fnt-dul Color yel Residual Flourescence
fnt
Amount none Distribution patchy Intensity dull Color
Stain Amount 10%Type stmg Amount
wh
Oil Show Rating Free Oil in Mud
bri
Color pl straw Color
Cut Color yel Intensity
213932 4382 209550 754
1 Hydrocarbon Ratios
9694 Gas Units 1913 Mud Chlorides (mg/L) =60500
426 120 306 1776
304 26 278 1121
218 31 187 685
230 112 118
2
10434 Gas Units 2230 Mud Chlorides (mg/L) =6900
248031 75700 172331 1084
290 131 159 1706
Hydrocarbon Ratios
193 92 101 1026
392 224 168 2825
6900
264850 33160 231690 772
208 147 61
3
353 53 300 1466
201 43 158 788
10623 Gas Units 2434 Mud Chlorides (mg/L) =
4
11195 Gas Units 2192 Mud Chlorides (mg/L) =
418 124 294 1207
225 33 192
6900
241287 46190 195097 916
303 90 213 1790
177 110 67
163 54 109 1043
330 143 187 2912
Oil
Gas
NPH
NPH
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
No
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
153 66 87
137 29 108 962
303 89 214 2367
69000
244601 38696 205905 710
345 55 290 1907
4
12800 Gas Units 2203 Mud Chlorides (mg/L) =
382 0 382 1576
191 0 191
355 0 355 1645
183 0 183 788
11868 Gas Units 2756 Mud Chlorides (mg/L) =72000
301060 70 300990 848
188 30 158
3 Hydrocarbon Ratios
172 7 165 767
354 26 328 1591
72000
256739 5301 251438 892
282 0 282 1524
176 20 156
2
11405 Gas Units 2337 Mud Chlorides (mg/L) =
325 15 310 1554
283 0 283 1637
152 4 148 782
243820 1474 242346 856
1 Hydrocarbon Ratios
11311 Gas Units 2214 Mud Chlorides (mg/L) =72000
wh
Oil Show Rating Free Oil in Mud
bri
Color pl straw Color
Cut Color yel Intensity
light straw
Color brn Intensity dul Color straw Residual Flourescence
none-fnt
Amount tr Distribution uni Intensity dull Color
Stain Amount tr Type stmg Amount
Cuttings Analysis:
Odor fnt Fluorescence Cut Fluorescence Residual Cut
Andrew Buchanan 7/8/2014
Interpretation:
This interval displays non-producible hydrocarbons based upon the gas and chromatograph data collected. It is dominated by unconsolidated, fine to
very fine grain, subrounded to subangular, well sorted, quartz sand. There is no free oil in the sample, uniform dull yellow sample flourescence, a dull
yellow streaming flourescence cut, pale straw to light amber cut, a light amount of amber residual ring, and dull to bright white residual fluorescence
ring.
Show Report Report # 7
SP12-SE3 L1 11200'13200'
Spy Island 3347 3141
ENI Petroleum
Danielle Dawson OA Sands
Oil
Gas
NPH
NPH
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
SP12-SE3 & SP12-SE3 L1
ENI Petroleum
MI Swaco
Doyon 15
AK-XX-0901412968
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++
7-Jun 160 8.70 150 35 52 20/36/50 6.3 122/87/71/49/19/15 2/-2.0 0/98 AREA:0.20 9.9 20.0 .15/.30 1200 72 Lubricate Rig
8-Jun 600 9.10 113 29 35 28/45/56 5.8 93/64/53/39/18/16 2/-3.0 1/96 0.10 0.20 9.5 21.0 .10/.25 1650 64 Drilling 16" Hole
9-Jun 2800 9.40 93 23 38 25/48/61 5.4 84/61/50/38/19/17 2/-4.0 1/95 0.15 0.25 10.4 22.0 .15/.50 1850 64 BROOH
10-Jun 2883 9.40 64 23 25 19/35/48 5.4 71/48/39/28/16/14 2/-4.0 1/95 0.15 0.20 95.0 20.0 .05/.35 1650 72 POOH w/Casing
11-Jun 2883 9.50 75 65 33 20/41/53 5.4 89/61/49/36/17/15 2/-5.0 1/94 0.15 0.20 9.3 20.0 .05/.35 1500 40 Clean out run
12-Jun 2883 9.40 44 19 15 7/8/8 -53/34/27/20/8/7 ----------Cement Casing
13-Jun 2883 9.40 44 20 13 7/8/8 ------------BOPs Test - P/U Drill pipe
14-Jun 2883 9.40 46 20 14 7/8/8 ------------BOP Test / Picking up BHA #4
15-Jun 3161 9.30 47 11 25 13/16/18 5.9 47/36/31/25/13/11 2/-4.0 2/94 -0.30 0.30 9.7 2.0 .15/1.00 800 52 Drilling 12.25'' Hole
16-Jun 4140 9.30 55 16 31 14/22/27 5.1 63/47/40/31/14/12 2/-4.5 2/94 0.15 0.30 9.6 11.0 .15/1.10 1300 56 Continue Drilling 12.25" Hole
17-Jun 5147 9.30 55 15 29 13/26/34 4.4 59/44/38/30/14/12 2/-4.9 2.75/92.3 0.10 0.20 9.7 14.5 .10/1.10 1600 64 Drilled to Intermediate TD
18-Jun 5207 9.35 59 14 27 16/28/36 4.8 55/41/35/28/13/11 2/-5.0 2.5/92.5 0.10 0.20 9.8 16.0 .10/1.00 1500 60 R/U Tesco Tools
19-Jun 5207 9.40 48 9 16 8/16/28 4.6 34/25/22/17/8/6 2/-5.0 0.0 0.10 0.15 9.0 15.0 .10/1.80 15000 60 RIH w/ casing & pump cement
20-Jun 5207 9.40 50 9 16 8/16/28 4.6 34/25/22/17/8/6 1/-5.0 2.5/92.5 0.10 0.15 9.0 15.0 .10/.80 1500 60 RIH BHA #5
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG
21-Jun 5768 9.25 46 14 19 8/8/9 4.6 47/33/28/22/8/7 NA/2 6.81 67/33 2.65 3.45 673 28.92 -0.8/6.1 2.8 Drilling 8.75" hole
22-Jun 8024 9.2 41 12 12 7/7/8 4.6 38/26/21/16/7/6 NA/2 7.17 69/31 2.4 3.12 620 29.35 -0.9/6.3 2.8 Drilling 8.75" hole
23-Jun 10565 9.2 43 12 17 8/8/8 4.6 41/29/24/18/8/7 NA/2 7.64 70/30 2.9 3.77 612 36.17 -0.9/6.7 2.8 Drilling 8.75" hole
24-Jun 12062 9.2 42 12 15 7/7/8 4.6 39/27/23/18/8/7 NA/1 8.08 69/31 3.1 4.03 644 32.88 -1.1/7 2.8 Drilling 8.75" hole
25-Jun 14215 9.2 46 12 17 7/7/8 4.4 41/29/23/18/8/7 NA/1 8.29 71/29 3 3.9 640 30.69 -1.5/6.8 2.8 Drilling 8.75" hole
26-Jun 15216 9.2 43 12 18 7/78 4.6 42/30/25/19/8/7 NA/1 8.15 71/29 2.9 3.77 647 26.21 -13.18/65.62 2.8 BROOH
27-Jun 15216 9.2 41 12 13 7/7/7 -37/25/20/16/7/6 NA/-8.28 72/28 2.6 3.38 690 25.58 -12.97/67.15 2.8 BROOH
28-Jun 15216 9.2 40 12 13 7/7/7 -37/25/20/16/7/6 NA/-8.28 72/28 2.6 3.38 670 25.58 -12.97/67.15 2.8 RIH 5.5" Liner
29-Jun 15216 9.2 40 11 12 6/7/7 -34/23/17/13/7/6 NA/-7.99 71/29 2 2.6 665 26.84 -9.43/68.15 2.8 Test backside
30-Jun 15216 9.2 40 11 12 6/7/7 -34/23/17/13/7/6 NA/-7.99 71/29 2.3 2.99 660 26.51 -9.99/68.01 2.8 Orient Whipstock
1-Jul 5032 9.2 41 11 12 6/7/7 4.6 34/23/17/13/7/6 NA/1 7.99 71/29 2.35 3.06 661 26.51 -9.99/68.01 2.8 Orient MWD/Motor
2-Jul 5232 9.2 42 10 14 6/7/7 4.5 34/24/18/14/7/6 NA/2 7.99 71/29 2.00 2.6 650 26.75 -27.78/49.58 3 M/U BHA
3-Jul 6619 9.25 44 14 14 8/8/9 4.2 42/28/23/18/8/7 NA/2 9.54 73/27 2.20 2.86 712 28.29 -79.85/7.46 2.6 Drilling 8.75" hole
4-Jul 9548 9.25 44 12 17 7/8/8 4.2 41/29/24/18/8/7 NA/2 9.1 72/28 2.10 2.73 677 29.8 -44.87/36.48 3 Drilling 8.75" hole
5-Jul 12208 9.30 44 12 18 8/8/9 4.0 42/30/24/18/8/7 NA/2 8.5 71/29 2.30 2.99 746 30.7 -47.37/32.33 3 Drilling 8.75" hole
6-Jul 14684 9.30 44 11 20 8/8/9 4.0 42/31/24/18/8/7 NA/1 9.1 73/27 2.10 2.73 743 31.0 -51.75/33.64 3 DrIlling 8.75" hole
7-Jul 15245 9.30 44 12 19 8/8/9 4.0 42/31/24/18/8/7 NA/2 8.7 72/28 2.60 2.89 789 30.0 -45.45/25.65 3 Reach TD 15245'
8-Jul 15245 9.30 43 12 16 8/9/9 4.1 40/28/24/18/8/7 1/32"8.7 70/30 2.60 3.38 902 31.9 -31.95/42.74 2.6 BROOH
9-Jul 15245 9.30 43 11 17 8/8/9 3.1 39/28/22/17/8/7 1/32"8.6 73/27 2.40 3.12 874 34.3 -77.88/0.05 2.6 Retrieve Whipstock
10-Jul 15245 9.25 43 11 16 8/8/9 3.8 38/27/22/17/8/7 1/32"8.7 73/27 2.30 2.99 847 33.7 -78.77/0.09 2.6 Retrieve/Fish for Whipstock
11-Jul 15245 9.25 43 11 18 8/8/8 -40/29/23/17/8/7 -8.1 73/28 2.30 2.99 780 33.5 -73.98/0 2.6 L/D Cleanout BHA
12-Jul 15245 9.25 43 12 15 8/8/9 -39/27/22/18/8/7 -8.2 72/28 2.20 2.60 772 33.3 -74.45/0 2.6 RIH 5.5" Liner
Casing Record
20" Conductor @ 160' MD, 160'TVD
13.375" Casing @ 2878' MD, 2463'TVD
9.625" Casing @ 5193' MD, 3979'TVD
9.625 Casing Window@ TOW: 4992' MD, 3943'TVD; BOW: 5009' MD, 3947' TVD
WELL NAME:LOCATION:Spy Island
OPERATOR:AREA:North Slope Borough
MUD CO:STATE:Alaska
RIG:SPUD:8-Jun-2014
SPERRY JOB:TD:7-Jul-2014
Remarks
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
2 100 1 Hughes Milltooth MX-1 16.00 160 2883 2723 17.60 1.117 155.1 20 40 1700 800 1-1-WT-A-E-I-NO-TD Surface TD
3 200 1RR Smith GF15B Insert 12.25 2883 2883 0 13.00 1.117 -----2-7-BT-G-E-5-WT-BHA Cleanout
4 300 2 Smith GF15B Insert 12.25 2883 5207 2324 34.30 1.117 67.8 25 40 1350 750 1-3-BT-G-E-1-WT-TD Intermediate TD
5 400 3 Hycalog SKH616M-E1D PDC 8.75 5207 15216 10009 82.30 0.902 121.7 15 160 2450 550 1-1-CT-A-X-IN-NO-TD Production TD
6 500 4 Baker 8.5" OD Window Mill 8.75 4992 5032 40 --------Mill Window
7 600 4RR Smith XR+CPS Milltooth 8.75 5032 5232 200 2.60 0.746 77.8 18 40 1400 450 1-1-WT-A-E-1-No-BHA Kick off whipstock
8 700 5 Hycalog SKH616M-E1D PDC 8.75 5232 ----------Production section, Ecoscope failure
9 700 5RR Hycalog SKH616M-E1D PDC 8.75 5232 15245 10013 157.5 0.902 179.1 15 160 2600 550 1-2-BT-A-X-In-CT-TD Production TD
WELL NAME:SP12-SE3 & SP12-SE3 L1 LOCATION:Spy Island
OPERATOR:ENI Petroleum AREA:North Slope Borough
MUD CO:
SPERRY JOB:AK-XX-0901412968 TD:7-Jul-2014
MI Swaco STATE:Alaska
RIG:Doyon 15 SPUD:8-Jun-2014
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:Waiting power to finish rigging up
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
0
6-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
ConditionBit #Size
2731'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Background
(max)
Trip
Average
Mud Type
Lst
Hydril 563
Type
120'
Depth in / out
YP
(lb/100ft2)
000
00
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Rig Move/Rig up
PV
Footage
B. Perry/R. Wimmer
ShClyst TuffGvlCoal
cP
40.0
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
120'
120'
0'
Max @ ft Current
Date:
Time:
No gas to report over the last 24 hours.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
L-80
Oil / Water Alkal
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Jane Grundin / Doug Acker
Set AtSize
178.9 X-65
Grade
L-804949'
20.00''
9.625"
(max)(current)
BTC
0
0
Cly
0
.
.
*
24 hr Recap:N/U diverter stack and test. N/U diverter and test. R/U secondary kill line, kill SI11 w/200bbls 9.6ppg brine, perfrom
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
20.00
0
7-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
ConditionBit #
2.08.708.70
Size
HWDP/Jars/NMFDC and rack back. Load rig floor w/BHA tools.
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
EVEMAR
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Background
(max)
Trip
Average
Mud Type
Lst
Type
Spud Mud 6.3120'52
Depth in / out
YP
(lb/100ft2)
0.20
000
00
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Rig Move/Rig up
PV
Footage
B. Perry/R. Wimmer
ShClyst TuffGvlCoal
cP
35
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
120'
120'
0'
Max @ ft Current
Date:
Time:
No gas to report over the last 24 hours.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
/98150
Oil / Water Alkal
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Jane Grundin / Doug Acker
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
4024
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Jane Grundin / Doug Acker
985
0
654
132
Units*
Casing
Summary
Lithology (%)
0
Oil / Water
1059'
Alkal
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
/98150
C-5n
1023'
63.0
C-2
37
in
1 130'Minimum
Depth
Time:
9
The maximum gas was 37 units at 1023’ MD and the average gas was 9 units.
120'
1059'
939'
Max @ ft Current
930'265.0
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
278.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
B. Perry/R. Wimmer
ShClyst TuffGvlCoal
cP
35
Footage
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling ahead
PV
24 hr Max
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
0.20
000
Spud Mud 6.3120'52
Depth in / out
Mud Type
Lst
Type
Average
16Background
(max)
Trip
9.609.80
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
160'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
f/160' t/360' Drill f/360' t/392', Pump out of hole, M/U remaining BHA #2, wash down t/392'. Drill f/392' t/1059'.
160'
ConditionBit #
1
2.0
16
8.70
Hughes MX-1 Mill Tooth
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.90
DOYON15 Report For:
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
8-Jun-2014
12:00 AM
Current Pump & Flow Data:
901
Max
0
Lime
(lb/bbl)
20.00
Install skirt around stack, prep handling equip for BHA. P/U BHA #1. Pre spud meeting, flood conductor, test surface
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drilled from 1059' to 2883', Monitor well (static), BROOH f/2883' t/2783' @850gpm.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
22.00
0
9-Jun-2014
12:00 AM
Current Pump & Flow Data:
1576
Max
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.00
DOYON15 Report For:
ConditionBit #
1
4.0
16
9.50
Hughes MX-1 Mill Tooth
9.40
Size
The maximum gas was 752 units at 1962’ MD and the average gas was 119 units.
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
160'
WOB
EVEMAR
9.809.90
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
23Background
(max)
Trip
Average
Mud Type
Lst
Type
Spud Mud 5.4120'38
Depth in / out
YP
(lb/100ft2)
0.25
000
00
CementCht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling ahead
PV
Footage
B. Perry/R. Wimmer
ShClyst TuffGvlCoal
cP
23
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
348.0 Flow In (gpm)
Flow In (spm)
1059'
2883'
1824'
Max @ ft Current
2480'177.0
Date:
Time:
119
in
4 1059'Minimum
Depth C-5n
1962'
0.0
C-2
752
SPP (psi)
Gallons/stroke
TFABit Type
Depth
1/9593
Oil / Water
2883'
Alkal
1.117
0
0
0
Siltst
852
172
Units*
Casing
Summary
Lithology (%)
011895
403
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Jane Grundin / Doug Acker
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
0
0
Cly
73133
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
79505
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Jane Grundin / Doug Acker
5168
0
Units*
Casing
Summary
Lithology (%)
0
Oil / Water
2883'
Alkal
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
1/9564
C-5n
1952'
C-2
798
in
Minimum
Depth
Time:
52
The maximum wiper gas 798 units
2883'
2883'
0'
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
23
2723'
Footage
17.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Pulling Casing
PV
24 hr Max
W eight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
0.20
000
40
Spud Mud 5.4120'25
Depth in / out
Mud Type
Lst
Type
Average
79823Background
(max)
Trip
9.809.90
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
20160' 2883'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
650psi w/no returns (shoe plugged). Attempt to free @3000psi, no returns. Rotate out of hole f/1760' t/1485'
observed slack off weight fall f/140k t/90-100k. Pull back t/1760', would not go past 1780'. Attempt to break circ, pressure up to
160'
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1
4.0
16
9.40
Hughes MX-1 Mill Tooth
9.40
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.00
DOYON15 Report For:
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
10-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
(mg/L)
1650
BROOH as per K&M f/2783' t/406'. POOH f/406' t/123', stand back 2 std HWDP & NMFC, B/D Top drive. L/D BHA #2
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
13548
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Jane Grundin / Doug Acker
864
0
Units*
Casing
Summary
Lithology (%)
0
Oil / Water
2883'
Alkal
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
1/9575
C-5n
2883'
C-2
133
in
Minimum
Depth
Time:
8
The maximum Trip Gas 133 units
2883'
2883'
0'
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
28
2723'
Footage
17.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Clean out run
PV
24 hr Max
W eight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
0.20
000
40
Spud Mud 5.4120'33
Depth in / out
Mud Type
Lst
Type
Average
1335Background
(max)
Trip
9.809.90
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
20160' 2883'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
as per K&M cycle,
P/U & M/U BHA #3 t/576'MD. TIH f/576' t/2817'MD. @2817' break circ, wash down and tag btm @2883'. BROOH f/2883' t/1275'
160'
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1
5.0
16
9.50
Hughes MX-1 Mill Tooth
9.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.00
DOYON15 Report For:
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
11-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
(mg/L)
1500
POOH f/1485' t/82' w/13-3/8" casing, L/D in pipe shed. Drain shoe track and cut all connections, L/D same.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:BROOH as per K&M f/1276' t/297'. L/D BHA #3 . B/D Top Drive, clean/clear rig floor. R/U t/run CSG as per GBR. RIH
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
(mg/L)
0
12-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.00
DOYON15 Report For:
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1 16Hughes MX-1 Mill Tooth
9.40
Size
returns. B/D, R/D all equip, R/D csg equip
pump 103bbls mud push, 469bbls lead slurry, 65bbls tail slurry, chase with Spud mud, bump plug @405bbls, 75bbls cement
jt/hanger, land @2877'. Circ. & condition mud for cementing, weight up mud push. Pump cement as per plan, PT cement line,
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
20160' 2883'
WOB
EVEMAR
9.809.90
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Background
(max)
Trip
Average
Mud Type
Lst
Type
40
Spud Mud120'15
Depth in / out
YP
(lb/100ft2)
000
00
CementCht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Clean pits
PV
2723'
Footage
17.60
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
19
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
2883'
2883'
0'
Max @ ft Current
Date:
Time:
No Gas was Observed over the last 24 hrs
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
44
Oil / Water
2883'
Alkal
1.117
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Doug Acker
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Doug Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
Oil / Water
2883'
Alkal
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
44
C-5nC-2
No Gas was Observed over the last 24 hrs
in
Minimum
Depth
Time:
2883'
2883'
0'
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
20
2723'
Footage
17.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
P/U Pipe
PV
24 hr Max
W eight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
000
40
Spud Mud120'13
Depth in / out
Mud Type
Lst
Type
Average
Background
(max)
Trip
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
20160' 2883'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
load/process 5" drill pipe in shed. Lubricate rig. Cont. to load/process 5" drill pipe. M/U stands and rack back.
160'
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1 16Hughes MX-1 Mill Tooth
9.40
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
13-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
(mg/L)
N/D surface stack. N/U BOPE, prep surface hanger, N/U wellhead test connections t/2000psi, N/U hi-psi riser. N/U
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:M/U stands of 5" DP and rack back in derrick, 408jts picked up. R/U begin testing BOPE. C/O upper seals on pipe
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
(mg/L)
0
14-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1 16Hughes MX-1 Mill Tooth
9.40
Size
No Gas was Observed over the last 24 hrs
wear bushing. B/D & R/D test equip. R/U & test 13-3/8" casing t/2500psi, R/D test equip. P/U & M/U BHA #4.
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
20160' 2883'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Background
(max)
Trip
Average
Mud Type
Lst
Type
40
Spud Mud120'14
Depth in / out
YP
(lb/100ft2)
000
00
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
P/U BHA #4
PV
2723'
Footage
17.60
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
20
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
2883'
2883'
0'
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
46
L-80
Oil / Water
2883'
Alkal
1.117
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Doug Acker
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
BTC
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
5263
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Doug Acker
2338
0
13.38''
747
150
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil / Water
3268'
Alkal
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
47
C-5n
3268'
178.0
C-2
52
in
0 2955'Minimum
Depth
Time:
23
2883'
3268'
385'
Max @ ft Current
3193'97.9
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
374.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
11
2723'
12.25 1.117
Footage
17.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling Ahead
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
0.30
000
40
Smith GF15B Insert
Spud Mud 5.9
2883'
120'25
Depth in / out
Mud Type
Lst
100
Type
Average
12Background
(max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
20160' 2883'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
2
The maximum gas was 52 units at 3268’ MD and the average gas was 23 units
Drill f/2905' t/3268'.
inspect brakes. CBU for FIT test, recip. f/2814' t/2721'. R/U & perfrom LOT, LOT 10.6ppg EMW. Break circ.& wash/ream f/2814' t/2905'. Drill f/2905' t/3247', 2815' TVD.
2878'
160'
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1
4.0
16
9.35
Hughes MX-1 Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
15-Jun-2014
12:00 AM
Current Pump & Flow Data:
1019
Max
0
Chlorides
(mg/L)
800
P/U BHA #4 as per SLB. RIH f/655' t/2534, SHT @1500'. Wash/Ream f/2534' t/2795', drill out float equip. shoe track
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Conitue to drill from 3268' MD to 4215' MD.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
(mg/L)
1300
0
16-Jun-2014
12:00 AM
Current Pump & Flow Data:
1154
Max
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.60
DOYON15 Report For:
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1
4.5
16
9.35
Hughes MX-1 Mill Tooth
9.30
Size
2
The maximum gas was 22 units at 3980’ MD and the average gas was 12 units
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
20160' 2883'
WOB
EVEMAR
9.409.50
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
5Background
(max)
Trip
Average
Mud Type
Lst
85
Type
40
Smith GF15B Insert
Spud Mud 5.1
2883'
120'31
Depth in / out
YP
(lb/100ft2)
0.30
000
00
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling Ahead
PV
2723'
12.25 1.117
Footage
17.60
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
16
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
306.0 Flow In (gpm)
Flow In (spm)
3268'
4215'
947'
Max @ ft Current
3306'117.0
Date:
Time:
12
in
0 2883'Minimum
Depth C-5n
3980'
16.0
C-2
22
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2/9455
L-80
Oil / Water
4201'
Alkal
1.117
0
0
0
Siltst
13.38''
744
150
Units*
Casing
Summary
Lithology (%)
0
15
1286
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Doug Acker
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
BTC
0
0
Cly
2278
.
.
*
24 hr Recap:
(max)(current)
BTC
115
0
Cly
120937
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Doug Acker
8324
655
13.38''
848
170
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil / Water
5206'
Alkal
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.75/92.355
C-5n
4806'
0.0
C-2
988
in
6 4380'Minimum
Depth
Time:
83
4215'
5207'
992'
Max @ ft Current
4308'98.7
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
385.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
15
2723'
12.25 1.117
Footage
17.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
TD Intermediate
PV
24 hr Max
68.0
Weight
9
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
0.20
000
40
Smith GF15B Insert
Spud Mud 4.4
2883'
120'29
Depth in / out
Mud Type
Lst
100
Type
Average
12Background
(max)
Trip
9.9010.00
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
20160' 2883'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
12
2
The maximum gas was 988 units at 4806’ MD and the average gas was 83 units
2878'
160'
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1
5.0
16
9.35
Hughes MX-1 Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.10
DOYON15 Report For:
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
17-Jun-2014
12:00 AM
Current Pump & Flow Data:
1594
Max
1
Chlorides
(mg/L)
1600
Conitue to drill 12.25 '' hole; TD intermediate section at 5207' MD. Circulating and backreaming out of hole.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Circulate bottomes up two times. Rack stds back f/5165' to 5056'. BROOH at 850 gpm 1400 psi & 80 rpm to 2878'.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
(mg/L)
1500
0
18-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
1-3-BT-G-E-1-WT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1
5.0
16
9.35
Hughes MX-1 Mill Tooth
9.35
Size
2
The maximum gas was 190 units
Monitor well. 10 min. Static. POH to 2160'. Pump 25 bbl 11.4 lb/gal dry job. POH. L/D BHA #4.
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
25
20160' 2883'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
9Background
(max)
Trip
Average
Mud Type
Lst
100
Type
40
40
Smith GF15B Insert
Spud Mud 4.8
2883'
120'27
5207'
Depth in / out
YP
(lb/100ft2)
0.20
000
00
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Run Casing
PV
2723'
12.25 1.117
Footage
34.30 2324'
17.60
J. Keener/O. Amend
ShClyst TuffGvlCoal
cP
14
Gas Summary
0
0 0
(current)
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
5207'
5207'
0'
Max @ ft Current
Date:
Time:
13
in
0Minimum
Depth C-5n
0.0
C-2
190
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.5/92.559
L-80
Oil / Water
5207'
Alkal
1.117
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
01328
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Doug Acker
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
BTC
0
0
Cly
19026
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
17286
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Doug Acker
0
0
13.38''
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil / Water
5207'
Alkal
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
3/9348
C-5nC-2
172
in
0Minimum
Depth
Time:
5207'
5207'
0'
Max @ ft Current
Date:
Avg
to 0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
J. Keener/O. Amend
ShClyst TuffGvlCoal
cP
9
2723'
12.25 1.117
Footage
34.30 2324'
17.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Cement Job
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
0.15
000
40
40
Smith GF15B Insert
Spud Mud 4.6
2883'
120'16
5207'
Depth in / out
Mud Type
Lst
100
Type
Average
1729Background
(max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
25
20160' 2883'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
2
The maximum gas was 172 units
2878'
160'
Condition
1-1-WT-A-E-I-NO-TD
Bit #
1
5.0
16
9.40
Hughes MX-1 Mill Tooth
9.40
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
1-3-BT-G-E-1-WT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
19-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
(mg/L)
1500
Float 9 5/8" csg to 126'. Test floats. OK. RIH csg f/126' to 5192' MD. Calc disp observed. R/D Tesco equip. R/U cmt
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:N/D BOP. Set e-slips & cut 9 5/8" csg. N/U BOP & test BOP. Test 9 5/8" csg to 3000 psi for 30 min. P/U BHA #5.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
(mg/L)
1500
0
20-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
5.0
12.25Smith GF15B Insert
9.40
Size
3
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
Xceed675, PeriScope675, TeleScope675, EcoScope675
API FL
Chromatograph (ppm)
252883' 5207'
WOB
EVEMAR
Avg Min
Comments
Surface
RPM
ECD
(ppg)
ml/30min
Background (max)
Trip
Average
Mud Type
Lst
Type
40
Hycalog SKH616M-E1D PDC
LSND 4.6
5207'
5207'16
Depth in / out
YP
(lb/100ft2)
9.00
000
00
Intermediate
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901412968
RIH BHA #5
PV
2324'
8.75"0.902
Footage
34.30
J. Keener/O. Amend
ShClyst TuffGvlCoal
cP
9
40.0
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
5207'
5207'
0'
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
1550
L-80
MBT
5207'
pH
1.117
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
.
.
*
24 hr Recap:
(max)(current)
BTC
264
0
Cly
268387
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
24
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
129586
14
13.38''
601
120
Units*
Casing
Summary
Lithology (%)
33
L-80
Oil/Water
6203'
Alkal
1.117
0
105
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
67/3346
C-5n
5867'
126.0
C-2
2341
in
0 5207'Minimum
Depth
Time:
new hole. Drill ahead to 6203' MD. Samples were mostly sltst f/ 5207' MD to 5500' MD & clean sst f/ 5500' MD to 6200' MD.
942
Max Gas: 2341u Avg Gas: 942u
5207'
6203'
996'
Max @ ft Current
5908'241.0
Date:
Avg
to5207'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
440.5 Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
107 58
(current)
J. Keener/O. Amend
ShClyst TuffGvlCoal
cP
14
2324'
8.75"0.902
Footage
34.30
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling ahead
PV
24 hr Max
68.0
Weight
97
Hours
C-3
00
Intermediate
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.65
53016
40
Hycalog SKH616M-E1D PDC
FazePro 4.6
5207'
5768'19
Depth in / out
Mud Type
Lst
100
Hydril S53
Type
Average
302Background (max)
Trip
9.7511.31
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed675, PeriScope675, TeleScope675, EcoScope675
API FL
Chromatograph (ppm)
252883' 5207'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
151
3
2878'
160'
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
6.8
12.25Smith GF15B Insert
9.25
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
21-Jun-2014
12:00 AM
Current Pump & Flow Data:
1628
Max
50
Lime
(lb/bbl)
3
RIH w/ BHA #5. SHT MWD tools. Continue to RIH. Displace f/ LSND to FazePro. Drilled out shoe then 20'
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drill ahead f/ 6203' MD to midnight depth of 8296' MD. Samples consisted of clean sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
3
178
22-Jun-2014
12:00 AM
Current Pump & Flow Data:
1722
Max
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.73
DOYON15 Report For:
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
7.2
12.25Smith GF15B Insert
9.20
Size
3
2878'
160'
100% Gas In Air=10,000 UnitsConnection
298
Tools
Xceed675, PeriScope675, TeleScope675, EcoScope675
API FL
Chromatograph (ppm)
252883' 5207'
WOB
EVEMAR
9.9910.36
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
96Background (max)
Trip
Average
Mud Type
Lst
100
Hydril S53
Type
40
Hycalog SKH616M-E1D PDC
FazePro N/A
5207'
8024'14
Depth in / out
YP
(lb/100ft2)
2.40
50170104
00
Intermediate
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
215
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling ahead
PV
2324'
8.75"0.902
Footage
34.30
J. Keener/O. Amend
ShClyst TuffGvlCoal
cP
12
40.0
Gas Summary
0
259 140
(current)
Avg
to5207'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
569.8 Flow In (gpm)
Flow In (spm)
6203'
8296'
2093'
Max @ ft Current
6376'272.8
Date:
Time:
1002
Max Gas: 2272u Avg Gas: 1002u
in
10 6471'Minimum
Depth C-5n
6405'
27.0
C-2
2272
SPP (psi)
Gallons/stroke
TFABit Type
Depth
69/3141
L-80
Oil/Water
8296'
Alkal
1.117
0
235
0
Siltst
13.38''
591
139
Units*
Casing
Summary
Lithology (%)
155128207
67
907-685-0772Unit Phone:
62
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
394
0
Cly
256058
.
.
*
24 hr Recap:
(max)(current)
BTC
380
0
Cly
286845
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
82
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
104543
155
13.38''
552
120
Units*
Casing
Summary
Lithology (%)
124
L-80
Oil/Water
10803'
Alkal
1.117
0
248
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
70/3043
C-5n
8837'
165.0
C-2
2651
in
16 8391'Minimum
Depth
Time:
1291
Max Gas: 2651u Avg Gas: 12910u
8296'
10803'
2507'
Max @ ft Current
9645'290.7
Date:
Avg
to5207'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
465.6 Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
280 170
(current)
J. Keener/O. Amend
ShClyst TuffGvlCoal
cP
12
2324'
8.75"0.902
Footage
34.30
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling ahead
PV
24 hr Max
68.0
Weight
158
Hours
C-3
04
Intermediate
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.90
54142107
40
Hycalog SKH616M-E1D PDC
FazePro NA
5207'
10565'17
Depth in / out
Mud Type
Lst
100
Hydril S53
Type
Average
33Background (max)
Trip
10.1212.20
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed675, PeriScope675, TeleScope675, EcoScope675
API FL
Chromatograph (ppm)
252883' 5207'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
289
3
2878'
160'
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
7.6
12.25Smith GF15B Insert
9.20
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
23-Jun-2014
12:00 AM
Current Pump & Flow Data:
2036
Max
122
Lime
(lb/bbl)
4
Drill ahead f/ 8296' MD to midnight depth of 10803' MD. Samples consisted of clean sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drill ahead f/ 10803' MD to midnight depth of 12110' MD. Samples consisted of clean sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
4
67
24-Jun-2014
12:00 AM
Current Pump & Flow Data:
1964
Max
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
8.1
12.25Smith GF15B Insert
9.20
Size
3
2878'
160'
100% Gas In Air=10,000 UnitsConnection
173
Tools
Xceed675, PeriScope675, TeleScope675, EcoScope675
API FL
Chromatograph (ppm)
252883' 5207'
WOB
EVEMAR
9.8410.93
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
72Background (max)
Trip
Average
Mud Type
Lst
100
Hydril S53
Type
40
Hycalog SKH616M-E1D PDC
FazePro NA
5207'
15
Depth in / out
YP
(lb/100ft2)
3.10
297559
65
Intermediate
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
135
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling ahead
PV
2324'
8.75"0.902
Footage
34.30
J. Keener/R. Wimmer
ShClyst TuffGvlCoal
cP
12
40.0
Gas Summary
8
173 116
(current)
Avg
to5207'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
605.8 Flow In (gpm)
Flow In (spm)
10803'
12110'
1307'
Max @ ft Current
11725'268.2
Date:
Time:
1094
Max Gas: 2964u Avg Gas: 1094u
in
16 11012'Minimum
Depth C-5n
11751'
2.3
C-2
2964
SPP (psi)
Gallons/stroke
TFABit Type
Depth
69/3142
L-80
Oil/Water
12110'
Alkal
1.117
0
169
0
Siltst
13.38''
541
118
Units*
Casing
Summary
Lithology (%)
71129763
94
907-685-0772Unit Phone:
53
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
338
0
Cly
321304
.
.
*
24 hr Recap:
(max)(current)
BTC
453
22
Cly
350884
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
43
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
153715
5020
13.38''
551
120
Units*
Casing
Summary
Lithology (%)
116
L-80
Oil/Water
14306'
Alkal
1.117
12
187
17
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
71/2946
C-5n
13824'
0.0
C-2
3420
in
18 12271'Minimum
Depth
Time:
1513
Max Gas: 3420u Avg Gas: 1513u
12110'
14306'
2196'
Max @ ft Current
14125'290.5
Date:
Avg
to5207'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
572.4 Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
25
180 104
(current)
J. Keener/R. Wimmer
ShClyst TuffGvlCoal
cP
12
2324'
8.75"0.902
Footage
34.30
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drilling ahead
PV
24 hr Max
68.0
Weight
240
Hours
C-3
1423
Intermediate
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
3.00
3711578
40
Hycalog SKH616M-E1D PDC
FazePro NA
5207'
14215'17
Depth in / out
Mud Type
Lst
100
Hydril S53
Type
Average
112Background (max)
Trip
10.0212.00
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed675, PeriScope675, TeleScope675, EcoScope675
API FL
Chromatograph (ppm)
252883' 5207'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
182
3
2878'
160'
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
8.3
12.25Smith GF15B Insert
9.20
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
25-Jun-2014
12:00 AM
Current Pump & Flow Data:
2263
Max
94
Lime
(lb/bbl)
4
Drill ahead f/ 12110' MD to midnight depth of 114306' MD. Samples consisted of clean sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drill ahead f/ 14306' MD to production section of 15216' MD. BROOH. Samples consisted of clean sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
3.77
78
26-Jun-2014
12:00 AM
Current Pump & Flow Data:
2201
Max
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
8.2
12.25Smith GF15B Insert
9.20
Size
3
2878'
160'
100% Gas In Air=10,000 UnitsConnection
145
Tools
Xceed675, PeriScope675, TeleScope675, EcoScope675
API FL
Chromatograph (ppm)
252883' 5207'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
94Background (max)
Trip
Average
104
Mud Type
Lst
100
Hydril S53
Type
40
Hycalog SKH616M-E1D PDC
FazePro NA
5207'
15216'18
Depth in / out
YP
(lb/100ft2)
2.90
227849
1413
Intermediate
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
259
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
BROOH
PV
2324'
8.75"0.902
Footage
34.30
J. Keener/R. Wimmer
ShClyst TuffGvlCoal
cP
12
40.0
Gas Summary
23
132 76
(current)
Avg
to5207'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
447.7 Flow In (gpm)
Flow In (spm)
14306'
15216'
910'
Max @ ft Current
14777'278.5
Date:
Time:
1458
Max Gas: 3166u Avg Gas: 1458u
in
18 14325'Minimum
Depth C-5n
14946'
C-2
3166
SPP (psi)
Gallons/stroke
TFABit Type
Depth
71/2943
L-80
Oil/Water
15216'
Alkal
1.117
0
147
6
Siltst
13.38''
546
110
Units*
Casing
Summary
Lithology (%)
86166286
226
907-685-0772Unit Phone:
31
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
429
0
Cly
331764
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
0
0
13.38''
546
110
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil/Water
15216'
Alkal
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
72/2841
C-5nC-2
in
Minimum
Depth
Time:
Max Gas: 17u
15216'
15216'
0'
Max @ ft Current
Date:
Avg
to5207'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
J. Keener/R. Wimmer
ShClyst TuffGvlCoal
cP
12
2324'
8.75"0.902
Footage
34.30
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
BROOH
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
Intermediate
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.60
000
40
Hycalog SKH616M-E1D PDC
FazePro NA
5207'
15216'13
Depth in / out
Mud Type
Lst
Hydril S53
Type
Average
17Background (max)Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed675, PeriScope675, TeleScope675, EcoScope675
API FL
Chromatograph (ppm)
252883' 5207'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
3
2878'
160'
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
8.3
12.25Smith GF15B Insert
9.20
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
27-Jun-2014
12:00 AM
Current Pump & Flow Data:
1434
Max
0
Lime
(lb/bbl)
3.38
Cont to BROOH.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Cont to BROOH. L/D BHA #5. R/U liner equip & RIH w/ 5.5" liner.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
3.38
0
28-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
1-1-CT-A-X-IN-NO-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
8.3
12.25Smith GF15B Insert
9.20
Size
3
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
15
252883' 5207'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Background (max)
Trip
Average
7
Mud Type
Lst
Hydril S53
Type
160
40
Hycalog SKH616M-E1D PDC
FazePro NA
5207'
15216'13
15216'
Depth in / out
YP
(lb/100ft2)
2.60
000
00
Intermediate
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
RIH 5.5" Liner
PV
2324'
8.75"0.902
Footage
82.30 10009'
34.30
J. Keener/R. Wimmer
ShClyst TuffGvlCoal
cP
12
40.0
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
15216'
15216'
0'
Max @ ft Current
Date:
Time:
Max Gas: 7u
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
72/2840
L-80
Oil/Water Alkal
1.117
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
0
.
.
*
24 hr Recap:Run 5.5" liner from 2722' MD to 10112' MD. Pick up power tongs, M/U seal assembly, set slim pulse in collar. M/U
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
2.60
0
29-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
1-1-CT-A-X-IN-NO-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
8.0
12.25Smith GF15B Insert
9.20
Size
3
Set hanger and test.OK
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
15
252883' 5207'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Background
(max)
Trip
Average
Mud Type
Lst
Hydril 563
Type
160
40
Hycalog SKH616M-E1D PDC
FazePro NA
5207'
15216'12
15216'
Depth in / out
YP
(lb/100ft2)
2.00
000
00
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Test Backside
PV
2324'
8.75" 0.902
Footage
82.30 10009'
34.30
J. Keener/R. Wimmer
ShClyst TuffGvlCoal
cP
11
40.0
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
15216'
15216'
0'
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
71/2940
L-80
Oil/Water Alkal
1.117
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
0
.
.
*
24 hr Recap:Unsting f/ TOL. POOH 3 stnds. Cut & slip. POOH & L/D running tool. P/U Whipstock BHA & RIH to 4922' MD. Orient
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
2.99
0
30-Jun-2014
12:00 AM
Current Pump & Flow Data:
Max
1-1-CT-A-X-IN-NO-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-3-BT-G-E-1-WT-TD
Bit #
2
8.0
12.25Smith GF15B Insert
9.20
Size
3
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
15
252883' 5207'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Background (max)
Trip
Average
Mud Type
Lst
Hydril 563
Type
160
40
Hycalog SKH616M-E1D PDC
FazePro NA
5207'
15216'12
15216'
Depth in / out
YP
(lb/100ft2)
2.30
000
00
Intermediate
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
RIH w/ Whipstock
PV
2324'
8.75"0.902
Footage
82.30 10009'
34.30
J. Keener/R. Wimmer
ShClyst TuffGvlCoal
cP
11
40.0
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
15216'
15216'
0'
Max @ ft Current
Date:
Time:
whipstock to 5064' MD & set.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
71/2940
L-80
Oil/Water Alkal
1.117
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
965
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
681
42
13.38''
447
90
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil/Water
5031'
Alkal
0.902
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
71/2941
C-5n
5019'
C-2
18
in
10 4998'Minimum
Depth
Time:
milling BHA. Service rig. P/U BHA #7 & RIH. Perform FIT to 13.0ppg. Orient MWD/Motor.
14
5009'
5031'
22'
Max @ ft Current
5015'18.3
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
27.6 Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
M. Ross/R. Wimmer
ShClyst TuffGvlCoal
cP
11
10009'
8.75"0.746
Footage
82.30
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Orient MWD/Motor
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
Intermediate
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.35
000
160
Smith XR+CPS Mill Tooth
FazePro NA
5031'
5032'12
Depth in / out
Mud Type
Lst
Hydril 563
Type
Average
5Background (max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
SP Motor, TeleScope 675
API FL
Chromatograph (ppm)
155207' 15216'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
4RR
2878'
160'
Condition
1-1-CT-A-X-IN-NO-TD
Bit #
3
8.0
8.75"Hycalog SKH616M-E1D PDC
9.20
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
1-Jul-2014
12:00 AM
Current Pump & Flow Data:
1398
Max
0
Lime
(lb/bbl)
3.06
Mill 8.75" window in 9 5/8" csg f/ 4992' MD to 5032' MD. Pump sweep, monitor well & pump dry job. POOH & L/D
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
5540
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
90
2267
580
13.38''
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil/Water
5031'
Alkal
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
71/2942
C-5n
5152'
C-2
48
in
2 5031'Minimum
Depth
Time:
48u & the avg gas was 25u. Samples consisted of 50-90% sltst w/ some sst.
25
Max Gas: 48u Average Gas: 25u
5031'
5232'
201'
Max @ ft Current
5106'83.2
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
297.4 Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
M. Ross/R. Wimmer
ShClyst TuffGvlCoal
cP
10
200'
8.75"0.902
Footage
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
RIH w/ BHA #8
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
Intermediate
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.00
000
40
Hycalog SKH616M-E1D
FazePro NA
5232'
5232'14
Depth in / out
Mud Type
Lst
10
Hydril 563
Type
Average
2415Background (max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
5
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
8.0
8.75"Smith XR+CPS Mill Tooth
9.20
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 27
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
2-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Lime
(lb/bbl)
2.60
Drill f/ 5031' MD to 5232' MD. CBU x3 & POOH. L/D BHA. R/U & Test BOP. P/U BHA #8 & RIH. The max gas was
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max)(current)
BTC
376
0
Cly
222128
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
68
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
0
94784
571
13.38''
546
110
Units*
Casing
Summary
Lithology (%)
109
L-80
Oil/Water
5031'
Alkal
0.746
0
240
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
73/2744
C-5n
6887'
54.1
C-2
1954
in
0 5448'Minimum
Depth
Time:
ahead to 7096' MD. Max gas was 1954u. Samples consist of mostly clean sst.
629
Max Gas: 1954u Average Gas: 629u
5232'
7096'
1864'
Max @ ft Current
6937'290.9
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
550.4 Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
268 145
(current)
M. Ross/R. Wimmer
ShClyst TuffGvlCoal
cP
14
200'
8.75"0.902
Footage
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drill 8.75" L1 Hole
PV
24 hr Max
68.0
Weight
150
Hours
C-3
00
Intermediate
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.20
4013282
40
Hycalog SKH616M-E1D
FazePro NA
5232'
6619'14
Depth in / out
Mud Type
Lst
100
Hydril 563
Type
Average
715Background (max)
Trip
10.04
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
296
5
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
9.5
8.75"Smith XR+CPS Mill Tooth
9.25
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 28
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
3-Jul-2014
12:00 AM
Current Pump & Flow Data:
1829
Max
123
Lime
(lb/bbl)
2.86
RIH w/ BHA. SHT MWD, Ecoscope failure. POOH & C/O Ecoscope. RIH & MADD Pass f/ 5030' MD to 5232' MD. Drill
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drill ahead / 7096' MD to 9745' MD. Max gas was 2204u @ 7998' MD. Samples consisted of sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
2.73
170
4-Jul-2014
12:00 AM
Current Pump & Flow Data:
1986
Max
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 29
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
9.1
8.75"Smith XR+CPS Mill Tooth
9.25
Size
5
2878'
160'
100% Gas In Air=10,000 UnitsConnection
331
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
185031' 5232'
WOB
EVEMAR
10.3411.70
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
66Background (max)
Trip
Average
Mud Type
Lst
100
Hydril 563
Type
40
Hycalog SKH616M-E1D
FazePro NA
5232'
9548'17
Depth in / out
YP
(lb/100ft2)
2.10
70199136
03
Intermediate
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
209
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drill 8.75" L1 Hole
PV
200'
8.75"0.902
Footage
2.60
M. Ross/R. Wimmer
ShClyst TuffGvlCoal
cP
12
40.0
Gas Summary
0
338 203
(current)
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
520.4 Flow In (gpm)
Flow In (spm)
7096'
9745'
2649'
Max @ ft Current
7814'290.6
Date:
Time:
975
Max Gas: 2204u Average Gas: 975u
in
10 7681'Minimum
Depth C-5n
7998'
67.6
C-2
2204
SPP (psi)
Gallons/stroke
TFABit Type
Depth
72/2844
L-80
Oil/Water
5031'
Alkal
0.746
0
298
0
Siltst
13.38''
541
109
Units*
Casing
Summary
Lithology (%)
165
0
111973
92
907-685-0772Unit Phone:
99
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Kori Jo Plowman / Leigh Ann Rasher
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
379
0
Cly
245422
.
.
*
24 hr Recap:
(max)(current)
BTC
355
0
Cly
301060
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
62
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
0
136730
182
13.38''
541
109
Units*
Casing
Summary
Lithology (%)
112
L-80
Oil/Water
5031'
Alkal
0.746
0
182
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2 13/2944
C-5n
11868'
289.0
C-2
2756
in
17 11921'Minimum
Depth
Time:
1183
Max Gas:2756u Average Gas: 1183u
9745'
12387'
2642'
Max @ ft Current
11140'294.0
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
437.0 Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
200 128
(current)
M. Ross/R. Wimmer
ShClyst TuffGvlCoal
cP
12
200'
8.75" 0.902
Footage
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drill 8.75" L1 Hole
PV
24 hr Max
68.0
Weight
175
Hours
C-3
04
Intermediate
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
2.30
5013199
40
Hycalog SKH616M-E1D
FazePro NA
5232'
9548'18
Depth in / out
Mud Type
Lst
100
Hydril 563
Type
Average
248Background
(max)
Trip
11.1011.20
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
183
5
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
8.5
8.75"
9.30
Smith XR+CPS Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 30
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
5-Jul-2014
12:00 AM
Current Pump & Flow Data:
1986
Max
101
Lime
(lb/bbl)
2.99
Drill ahead / 9745' MD to 12387' MD. Max gas was 2756u @ 11868' MD. Samples consisted of sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drill ahead / 12387' MD to 14775' MD. Max gas was 2246u @ 13332' MD. Samples consisted of sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
2.73
92
6-Jul-2014
12:00 AM
Current Pump & Flow Data:
2282
Max
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 31
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.40
DOYON15 Report For:
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
9.1
8.75"
9.30
Smith XR+CPS Mill Tooth
9.30
Size
5
2878'
160'
100% Gas In Air=10,000 UnitsConnection
152
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
185031' 5232'
WOB
EVEMAR
11.1011.20
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
109Background
(max)
Trip
Average
Mud Type
Lst
100
Hydril 563
Type
40
Hycalog SKH616M-E1D
FazePro NA
5232'
14684'20
Depth in / out
YP
(lb/100ft2)
2.10
3411477
04
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
264
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drill 8.75" L1 Hole
PV
200'
8.75" 0.902
Footage
2.60
M. Ross/R. Wimmer
ShClyst TuffGvlCoal
cP
11
40.0
Gas Summary
0
180 112
(current)
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
432.0 Flow In (gpm)
Flow In (spm)
12387'
14775'
2388'
Max @ ft Current
14665'274.0
Date:
Time:
1160
Max Gas: 2246u Average Gas: 1160u
in
15 7681'Minimum
Depth C-5n
13332'
251.0
C-2
2246
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2 19/2744
L-80
Oil/Water
14684'
Alkal
0.746
0
167
0
Siltst
13.38''
500
110
Units*
Casing
Summary
Lithology (%)
109
0
134691
152
907-685-0772Unit Phone:
53
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
394
0
Cly
250903
.
.
*
24 hr Recap:
(max)(current)
BTC
399
0
Cly
218740
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
51
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
0
185003
123
13.38''
556
111
Units*
Casing
Summary
Lithology (%)
118
L-80
Oil/Water
15245'
Alkal
0.746
0
159
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
72 / 2844
C-5n
15109'
0.0
C-2
2063
in
12 14960'Minimum
Depth
Time:
1554
Max Gas: 2063u Average Gas: 1554u
14775'
15245'
470'
Max @ ft Current
15060'293.0
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
424.0 Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
162 111
(current)
M. Ross/R. Wimmer
ShClyst TuffGvlCoal
cP
14
200'
8.75" 0.902
Footage
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Drill 8.75" L1 Hole
PV
24 hr Max
68.0
Weight
297
Hours
C-3
04
Intermediate
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
2.00
3812382
40
Hycalog SKH616M-E1D
FazePro NA
5232'
14684'15
Depth in / out
Mud Type
Lst
100
Hydril 563
Type
Average
118Background
(max)
Trip
11.1011.20
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
128
5
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
9.1
8.75"
9.25
Smith XR+CPS Mill Tooth
9.25
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.40
DOYON15 Report For:
Morning Report Report # 32
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
7-Jul-2014
12:00 AM
Current Pump & Flow Data:
1976
Max
96
Lime
(lb/bbl)
2.60
Drill ahead / 14775' MD to TD 15245' MD. Max gas was 2063u @ 15109' MD. Samples consisted of sst.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:BROOH from 9922' to 5117'. Work DS through tight spots and pack offs as hole will allow T/5462' MD @5406' MD
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
2.60
0
8-Jul-2014
12:00 AM
Current Pump & Flow Data:
1077
Max
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 33
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.20
DOYON15 Report For:
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
9.1
8.75"
9.25
Smith XR+CPS Mill Tooth
9.25
Size
5
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
185031' 5232'
WOB
EVEMAR
10.9011.00
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
7Background
(max)
Trip
Average
Mud Type
Lst
100
Hydril 563
Type
40
Hycalog SKH616M-E1D
FazePro NA
5232'
14684'15
Depth in / out
YP
(lb/100ft2)
2.00
000
00
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
BROOH
PV
200'
8.75" 0.902
Footage
2.60
M. Ross/O. Amend
ShClyst TuffGvlCoal
cP
14
40.0
Gas Summary
0
0 0
(current)
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
15245'
15245'
0'
Max @ ft Current
Date:
Time:
10
Max Gas: 139u Average Gas: 10u
in
0Minimum
Depth C-5nC-2
139
SPP (psi)
Gallons/stroke
TFABit Type
Depth
72 / 2844
L-80
Oil/Water
15245'
Alkal
0.746
0
0
0
Siltst
13.38''
450
99
Units*
Casing
Summary
Lithology (%)
0
0
1535
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
15358
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
14286
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
1053
13.38''
152
25
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil/Water
15245'
Alkal
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2 19/2743
C-5nC-2
137
in
0Minimum
Depth
Time:
9
Max Gas: 137u Average Gas: 9u
15245'
15245'
0'
Max @ ft Current
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
M. Ross/O. Amend
ShClyst TuffGvlCoal
cP
11
200'
8.75" 0.902
Footage
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
RIH W/BHA # 1B
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
Intermediate
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
2.40
000
40
Hycalog SKH616M-E1D
FazePro NA
5232'
14684'17
Depth in / out
Mud Type
Lst
Hydril 563
Type
Average
5Background
(max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
5
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
8.6
8.75"
0.00
Smith XR+CPS Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 34
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
9-Jul-2014
12:00 AM
Current Pump & Flow Data:
1077
Max
0
Lime
(lb/bbl)
3.12
BROOH F/ 4880' MD to 3476' MD Circ. B/U 2X. POOH F/3476' MD T/957' MD. POOH F/957' MD to 397' MD. L/D BHA
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:POOH F/4940' MD T/490' MD. L/D BHA #1B, NO Whipstock on Hook. M/U BHA #1B. RIH F/491' MD to 1518' MD SHT
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
2.99
0
10-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
1-2-BT-A-X-In-CT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 35
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
8.7
8.75"
0.00
Smith XR+CPS Mill Tooth
9.25
Size
5
Static Loss. Drop Ball rod @ 4942' MD P/U T/4911' MD. POOH F/4942' MD T/490' MD
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
15
185031' 5232'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
0Background
(max)
Trip
Average
Mud Type
Lst
Hydril 563
Type
160
40
Hycalog SKH616M-E1D
FazePro NA
5232'
14684'16
15245'
Depth in / out
YP
(lb/100ft2)
2.30
000
00
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
POOH w/ Whip Stock
PV
200'
8.75" 0.902
Footage
55.90 4050'
2.60
M. Ross/O. Amend
ShClyst TuffGvlCoal
cP
11
40.0
Gas Summary
0
0 0
(current)
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
15245'
15245'
0'
Max @ ft Current
Date:
Time:
2
Max Gas: 6u Average Gas: 2u
in
0Minimum
Depth C-5nC-2
6
SPP (psi)
Gallons/stroke
TFABit Type
Depth
73 / 27'43
L-80
Oil/Water
15245'
Alkal
0.746
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
0235
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
721
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
508
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
289
13.38''
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil/Water
15245'
Alkal
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2 19/2743
C-5nC-2
5
in
0Minimum
Depth
Time:
2
Max Gas: 5u Average Gas: 2u
15245'
15245'
0'
Max @ ft Current
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
M. Ross/O. Amend
ShClyst TuffGvlCoal
cP
11
200'
8.75" 0.902
Footage
55.90 4050'
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Waiting On Diverter
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
Intermediate
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
2.30
000
160
40
Hycalog SKH616M-E1D
FazePro NA
5232'
14684'18
15245'
Depth in / out
Mud Type
Lst
Hydril 563
Type
Average
2Background
(max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
15
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
5
Prep well for well control. wait on replacement diverter.
Load Comp. Tools and MWD in Shed. M/U Diverter w/hanger seal assy. Stage up pumps to verify tool release. Unsuccessful.
flow rate. Wash Up T/4990' MD. Circ. B/U @400 GPM. POOH F/4937' MD T/80' MD L/D Cleanout BHA As per Baker Rep. Clean BHA. r.
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
8.1
8.75"
72 / 28'
Smith XR+CPS Mill Tooth
9.25
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 36
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
1-2-BT-A-X-In-CT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
11-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Lime
(lb/bbl)
2.99
L/D Whipstock Retrieval BHA, Whipstock and Anchor Assy As Per Baker Rep. Clean rig floor. M/U Baker cleanout
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:M/U BHA. RIH w/seal assy on 5" DP. F/150' MD T/4917' MD. w/SHT @ 1500' MD W/D F/4917' MD T/5086' MD Verify
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
2.60
0
12-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
1-2-BT-A-X-In-CT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 37
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
8.2
8.75"Smith XR+CPS Mill Tooth
9.25
Size
5
T/3292' MD. 80 Jts Run.
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
15
185031' 5232'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
0Background
(max)
Trip
Average
Mud Type
Lst
Hydril 563
Type
160
40
Hycalog SKH616M-E1D
FazePro NA
5232'
14684'15
15245'
Depth in / out
YP
(lb/100ft2)
2.20
000
00
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
RIH w/ Liner
PV
200'
8.75" 0.902
Footage
55.90 4050'
2.60
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
12
40.0
Gas Summary
0
0 0
(current)
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
15245'
15245'
0'
Max @ ft Current
Date:
Time:
0
Max Gas: 0u Average Gas: 0u
in
0Minimum
Depth C-5nC-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
72/2843
L-80
Oil/Water
15245'
Alkal
0.746
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
0
0
13.38''
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil/Water
15245'
Alkal
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
72/2843
C-5nC-2
0
in
0Minimum
Depth
Time:
0
Max Gas: 0u Average Gas: 0u
15245'
15245'
0'
Max @ ft Current
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
12
200'
8.75" 0.902
Footage
55.90 4050'
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
RIH w/LEM Tool
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
Intermediate
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
2.20
000
160
40
Hycalog SKH616M-E1D
FazePro NA
5232'
14684'15
15245'
Depth in / out
Mud Type
Lst
Hydril 563
Type
Average
0Background
(max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
15
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
5
liner packer.
Top @ 4981' MD. Shoe @ 15200' MD. Displace 9.2+ OBM w/9.1+ Brine. POOH on Elevators. L/D liner running tools. Service brake
T/15093' MD. Break Circ. W/D T/15183' MD.Observe drop into Alignment slot. Drop Setting Ball. P/U Ensure Ram is Set. Successful.
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR
8.2
8.75"Smith XR+CPS Mill Tooth
9.25
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 38
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
1-2-BT-A-X-In-CT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
13-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Lime
(lb/bbl)
2.60
RIH w/5.5" Liner F/3292' MD T/10176' MD Entry into SBD @ 4985' MD. w/Window Exit @ 5007' MD P/U & M/U
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:L/D liner top Packer, P/U & M/U LEM tool. M/U Liner top Packer to slim hole MWD. Orient as per Baker and SLB reps.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
0
14-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
1-2-BT-A-X-In-CT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 39
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR 8.75"Smith XR+CPS Mill Tooth
9.15
Size
5
RIH w/5.5' DP T/3000' MD POOH Set mouse hole. R/U to test BOPs
POOH and L/D 5.5" DP. F/4970' MD T/ 3755' MD Cont. POOH F/3755' MD L/D DP, L/D LEM Running tool and MWD. M/U Shoe,
and W/D Through top of RAM hanger. Seat packer. Packer Set. Test Packer. Successful. Un-sting from LEM. Monitor Well.(Static)
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
15
185031' 5232'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
0Background
(max)
Trip
Average
Mud Type
Lst
Hydril 563
Type
160
40
Hycalog SKH616M-E1D
FazePro
5232'
15245'
15245'
Depth in / out
YP
(lb/100ft2)
000
00
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Testing BOPs
PV
200'
8.75" 0.902
Footage
55.90 4050'
2.60
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
40.0
Gas Summary
0
0 0
(current)
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
15245'
15245'
0'
Max @ ft Current
Date:
Time:
0
Max Gas: 0u Average Gas: 0u
in
0Minimum
Depth C-5nC-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
28
L-80
Oil/Water
15245'
Alkal
0.746
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
0
0
13.38''
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil/Water
15245'
Alkal
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
28
C-5nC-2
0
in
0Minimum
Depth
Time:
0
Max Gas: 0u Average Gas: 0u
15245'
15245'
0'
Max @ ft Current
Date:
Avg
to5031'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
200'
8.75" 0.902
Footage
55.90 4050'
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Run 4.5” completion tubing
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
Intermediate
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
000
160
40
Hycalog SKH616M-E1D
FazePro
5232'
15245'
15245'
Depth in / out
Mud Type
Lst
Hydril 563
Type
Average
0Background
(max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed, Periscope, TeleScope, EcoScope
API FL
Chromatograph (ppm)
15
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
5
sec. Terminate gauge line, motor lead & capillary line.
to shroud. Set pack off & test to 1000 psi for 15 min. Good. R/D equip. POH f/138'. RBU upper comp in derrick. M/U & service motor
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR 8.75"Smith XR+CPS Mill Tooth
9.15
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 40
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
1-2-BT-A-X-In-CT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
15-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Lime
(lb/bbl)
Test BOPE's. C/O lower rams & replace inserts & air pump on Koomey. Complete BOPE test. R/U 4.5" comp
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
0
0
13.38''
Units*
Casing
Summary
Lithology (%)
0
L-80
Oil/Water Alkal
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
28
C-5nC-2
0
in
0Minimum
Depth
Time:
0
Max Gas: 0u Average Gas: 0u
15245'
15245'
0'
Max @ ft Current
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
200'
8.75" 0.902
Footage
55.90 4050'
2.60
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
L/D 5" Drill Pipe
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
Intermediate
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
000
160
40
Hycalog SKH616M-E1D
FazePro
5232'
15245'
15245'
Depth in / out
Mud Type
Lst
Hydril 563
Type
Average
0Background
(max)
Trip
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
15
185031' 5232'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
5
R/D Centrilift. SIMOPS: Lay down 5" drill pipe via mousehole and bullhead 130 bbls down OA at 2 bpm.
2878'
160'
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR 8.75"Smith XR+CPS Mill Tooth
9.15
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 41
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
1-2-BT-A-X-In-CT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
16-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Lime
(lb/bbl)
M/U top seal section to TTC & connect to shroud. Connect TEC to PSI discharge sub. R/U Volant tool. RIH 4.5" tbg to
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:L/D 5" DP. Clean & clear rig floor. N/D BOP. N/U tree. R/U and install TWC. SIMOPS: move rockwasher and mud
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Lime
(lb/bbl)
0
17-Jul-2014
12:00 AM
Current Pump & Flow Data:
Max
1-2-BT-A-X-In-CT-TD
Conductor
ROP
ROP (ft/hr)
4.96 @
Mud Data
Depth
Morning Report Report # 42
Customer:
Well:
Area:
Location:
Rig:
SP12-SE3 L1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-1-WT-A-E-1-NO-BHA
Bit #
4RR 8.75"Smith XR+CPS Mill Tooth
9.15
Size
5
2878'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
15
185031' 5232'
WOB
EVEMAR
Avg Min
Comments
Surface
Mud
RPM
ECD
(ppg)
ml/30min
0Background
(max)
Trip
Average
Mud Type
Lst
Hydril 563
Type
160
40
Hycalog SKH616M-E1D
FazePro
5232'
15245'
15245'
Depth in / out
YP
(lb/100ft2)
000
00
Intermediate
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901412968
Moving Rig
PV
200'
8.75" 0.902
Footage
55.90 4050'
2.60
B. Perry/O. Amend
ShClyst TuffGvlCoal
cP
40.0
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
15245'
15245'
0'
Max @ ft Current
Date:
Time:
0
Max Gas: 0u Average Gas: 0u
in
0Minimum
Depth C-5nC-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
28
L-80
Oil/Water Alkal
0.746
0
0
0
Siltst
13.38''
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Doug Acker
Maximum
Report By:Logging Engineers:Dani Dawson / Doug Acker
Set AtSize
178.9 X-65
Grade
L-805193'
20.00''
9.63''
(max)(current)
BTC
0
0
Cly
0
WELL INFORMATION Created On : Aug 11 2014
Customer :ENI Petroleum
Well Name :SP12-SE3
Job Number :AK-XX-0901412968
Rig Name :Doyon 15
Field Name :Nikaitchuq
Country :USA
Survey Report
SURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
0.00 0.00 316.50 0.00 0.00 N 0.00 E 0.00 0.00
40.83 0.00 316.50 40.83 0.00 N 0.00 E 0.00 0.00
114.22 0.46 338.08 114.22 0.27 N 0.11 W 0.27 0.63
129.82 0.50 332.13 129.82 0.39 N 0.17 W 0.39 0.41
159.83 0.54 330.96 159.83 0.63 N 0.30 W 0.63 0.14
191.44 0.87 309.86 191.44 0.92 N 0.55 W 0.92 1.31
221.82 1.39 327.30 221.81 1.37 N 0.93 W 1.37 2.03
252.46 1.10 327.34 252.44 1.93 N 1.29 W 1.93 0.95
283.44 1.79 323.97 283.41 2.57 N 1.73 W 2.57 2.24
314.47 2.82 309.39 314.42 3.45 N 2.61 W 3.45 3.79
345.15 3.90 312.14 345.04 4.63 N 3.96 W 4.63 3.56
389.81 5.33 314.45 389.56 7.10 N 6.57 W 7.10 3.23
451.49 7.51 317.76 450.85 12.09 N 11.33 W 12.09 3.58
544.38 11.58 314.38 542.43 23.11 N 22.08 W 23.11 4.42
636.94 13.40 315.27 632.80 37.23 N 36.26 W 37.23 1.98
730.31 16.67 317.72 722.96 54.83 N 52.89 W 54.83 3.57
823.74 20.61 319.33 811.47 77.23 N 72.63 W 77.23 4.25
917.05 25.09 320.44 897.44 104.95 N 95.95 W 104.95 4.82
1010.60 28.90 320.05 980.78 137.58 N 123.11 W 137.58 4.08
1103.96 32.09 320.42 1,061.22 174.00 N 153.40 W 174.00 3.42
1197.35 34.23 321.14 1,139.39 213.58 N 185.69 W 213.58 2.33
1290.72 35.84 317.40 1,215.85 254.15 N 220.68 W 254.15 2.87
1348.98 38.80 316.24 1,262.18 279.90 N 244.85 W 279.90 5.22
1442.46 42.12 316.19 1,333.29 323.69 N 286.82 W 323.69 3.55
1535.80 41.55 318.37 1,402.84 369.41 N 329.05 W 369.41 1.67
1628.84 40.33 316.32 1,473.13 414.25 N 370.35 W 414.25 1.95
1722.21 43.92 314.72 1,542.37 458.91 N 414.24 W 458.91 4.01
1815.64 45.47 313.91 1,608.78 504.81 N 461.26 W 504.81 1.77
1908.95 44.23 314.72 1,674.93 550.77 N 508.35 W 550.77 1.46
2002.39 42.88 314.61 1,742.65 596.03 N 554.14 W 596.03 1.45
INSITE V8.1.0 Page 1Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
2095.82 40.71 316.69 1,812.30 640.54 N 597.68 W 640.54 2.76
2189.20 42.97 322.78 1,881.90 688.06 N 637.84 W 688.06 4.98
2282.60 43.58 329.94 1,949.94 741.31 N 673.24 W 741.31 5.29
2375.88 38.84 333.46 2,020.11 795.34 N 702.44 W 795.34 5.66
2469.25 33.76 333.07 2,095.33 844.70 N 727.28 W 844.70 5.45
2562.66 31.41 331.67 2,174.03 889.27 N 750.59 W 889.27 2.64
2656.08 25.78 332.63 2,256.02 928.77 N 771.50 W 928.77 6.05
2749.36 20.43 334.86 2,341.79 961.55 N 787.76 W 961.55 5.81
2801.15 19.87 344.66 2,390.43 978.22 N 793.93 W 978.22 6.60
2883.00 19.00 354.00 2,467.63 1,004.89 N 799.00 W 1004.89 3.94
2947.38 17.69 1.31 2,528.75 1,025.10 N 799.87 W 1025.10 4.11
2978.97 16.93 7.87 2,558.91 1,034.46 N 799.13 W 1034.46 6.63
3008.92 16.52 12.65 2,587.59 1,042.93 N 797.60 W 1042.93 4.79
3102.35 17.14 31.95 2,677.09 1,067.59 N 787.40 W 1067.59 5.99
3195.78 19.18 47.01 2,765.91 1,089.75 N 768.88 W 1089.75 5.46
3289.07 19.34 57.01 2,854.00 1,108.62 N 744.70 W 1108.62 3.54
3382.45 22.59 66.96 2,941.22 1,124.07 N 715.21 W 1124.07 5.15
3475.86 25.48 79.28 3,026.58 1,134.84 N 678.93 W 1134.84 6.18
3569.19 29.15 84.34 3,109.50 1,140.81 N 636.57 W 1140.81 4.65
3662.60 34.16 87.21 3,188.99 1,144.34 N 587.70 W 1144.34 5.60
3756.02 37.97 87.46 3,264.49 1,146.89 N 532.77 W 1146.89 4.08
3849.37 38.92 88.63 3,337.60 1,148.86 N 474.77 W 1148.86 1.28
3942.80 43.07 92.81 3,408.12 1,148.00 N 413.53 W 1148.00 5.32
4036.20 45.01 97.22 3,475.27 1,142.28 N 348.89 W 1142.28 3.88
4129.52 48.76 100.14 3,539.05 1,131.95 N 281.58 W 1131.95 4.62
4222.91 51.13 102.28 3,599.15 1,118.04 N 211.48 W 1118.04 3.08
4316.28 56.25 104.41 3,654.42 1,100.63 N 138.31 W 1100.63 5.78
4409.66 61.33 104.94 3,702.79 1,080.40 N 61.08 W 1080.40 5.46
4503.10 61.23 104.96 3,747.69 1,059.26 N 18.09 E 1059.26 0.11
4596.45 61.97 105.09 3,792.09 1,037.97 N 97.40 E 1037.97 0.80
4689.90 63.60 107.76 3,834.84 1,014.46 N 177.10 E 1014.46 3.08
4783.24 66.03 109.97 3,874.56 987.14 N 257.01 E 987.14 3.37
4876.70 69.54 112.85 3,909.89 955.54 N 337.53 E 955.54 4.72
4970.14 75.78 115.47 3,937.73 919.02 N 418.85 E 919.02 7.19
5063.50 77.75 118.14 3,959.11 878.04 N 499.94 E 878.04 3.49
5124.67 81.29 119.17 3,970.24 849.20 N 552.72 E 849.20 6.02
5207.00 84.00 120.50 3,980.77 808.58 N 623.54 E 808.58 3.66
5278.22 83.68 117.26 3,988.42 774.38 N 685.53 E 774.38 4.55
5372.30 83.88 117.24 3,998.61 731.56 N 768.68 E 731.56 0.21
5464.99 83.69 120.95 4,008.65 686.76 N 849.18 E 686.76 3.98
5558.46 86.30 127.58 4,016.81 634.36 N 926.08 E 634.36 7.60
5651.83 85.72 129.24 4,023.31 576.50 N 999.06 E 576.50 1.88
5745.32 86.88 128.79 4,029.34 517.77 N 1,071.55 E 517.77 1.33
5838.67 88.05 127.47 4,033.47 460.19 N 1,144.90 E 460.19 1.89
5932.03 88.05 127.17 4,036.65 403.62 N 1,219.11 E 403.62 0.32
INSITE V8.1.0 Page 2Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
6025.43 88.08 126.95 4,039.80 347.36 N 1,293.60 E 347.36 0.24
6119.33 87.87 126.73 4,043.12 291.10 N 1,368.70 E 291.10 0.32
6212.23 89.36 126.79 4,045.37 235.52 N 1,443.10 E 235.52 1.61
6305.65 89.99 125.51 4,045.90 180.41 N 1,518.53 E 180.41 1.53
6399.08 91.89 125.49 4,044.36 126.17 N 1,594.58 E 126.17 2.03
6492.50 92.18 124.57 4,041.05 72.58 N 1,671.03 E 72.58 1.03
6585.85 91.75 123.56 4,037.85 20.32 N 1,748.32 E 20.32 1.18
6679.20 90.89 123.53 4,035.70 31.25 S 1,826.10 E -31.25 0.92
6772.60 89.61 124.72 4,035.29 83.65 S 1,903.41 E -83.65 1.87
6865.94 91.01 127.08 4,034.78 138.37 S 1,979.01 E -138.37 2.94
6959.32 88.30 125.40 4,035.34 193.57 S 2,054.32 E -193.57 3.41
7052.78 86.94 125.14 4,039.23 247.49 S 2,130.55 E -247.49 1.48
7146.24 88.89 126.01 4,042.63 301.82 S 2,206.52 E -301.82 2.28
7239.52 87.99 126.48 4,045.17 356.95 S 2,281.72 E -356.95 1.09
7333.36 88.64 125.26 4,047.93 411.91 S 2,357.73 E -411.91 1.47
7426.36 87.56 126.10 4,051.01 466.12 S 2,433.22 E -466.12 1.47
7519.77 87.73 124.66 4,054.85 520.16 S 2,509.32 E -520.16 1.55
7613.19 90.43 123.65 4,056.35 572.59 S 2,586.61 E -572.59 3.09
7706.58 90.28 124.48 4,055.77 624.90 S 2,663.97 E -624.90 0.90
7799.95 88.00 124.60 4,057.17 677.83 S 2,740.87 E -677.83 2.45
7893.46 86.63 125.04 4,061.55 731.17 S 2,817.55 E -731.17 1.54
7986.86 85.92 125.10 4,067.62 784.72 S 2,893.83 E -784.72 0.76
8080.15 89.09 126.12 4,071.68 838.98 S 2,969.59 E -838.98 3.57
8173.58 89.68 127.39 4,072.68 894.88 S 3,044.44 E -894.88 1.50
8267.03 90.20 128.95 4,072.78 952.63 S 3,117.91 E -952.63 1.76
8360.38 87.95 126.69 4,074.29 1,009.86 S 3,191.63 E -1009.86 3.42
8453.79 89.80 125.60 4,076.12 1,064.94 S 3,267.04 E -1064.94 2.30
8547.20 91.40 125.36 4,075.14 1,119.15 S 3,343.10 E -1119.15 1.73
8640.66 90.43 124.45 4,073.65 1,172.62 S 3,419.74 E -1172.62 1.42
8734.06 90.29 123.68 4,073.06 1,224.94 S 3,497.11 E -1224.94 0.84
8827.75 89.86 123.42 4,072.94 1,276.72 S 3,575.19 E -1276.72 0.54
8920.82 87.71 121.62 4,074.91 1,326.74 S 3,653.64 E -1326.74 3.01
9014.36 88.88 122.12 4,077.70 1,376.10 S 3,733.04 E -1376.10 1.36
9107.72 88.88 122.37 4,079.52 1,425.90 S 3,811.99 E -1425.90 0.27
9201.05 88.87 123.25 4,081.35 1,476.46 S 3,890.41 E -1476.46 0.94
9294.85 90.44 123.86 4,081.92 1,528.31 S 3,968.58 E -1528.31 1.80
9387.78 92.52 124.48 4,079.52 1,580.48 S 4,045.43 E -1580.48 2.34
9482.03 92.22 124.44 4,075.62 1,633.77 S 4,123.08 E -1633.77 0.32
9574.65 91.01 125.18 4,073.01 1,686.62 S 4,199.09 E -1686.62 1.53
9668.96 90.33 126.30 4,071.91 1,741.70 S 4,275.63 E -1741.70 1.39
9761.41 89.88 126.81 4,071.74 1,796.76 S 4,349.90 E -1796.76 0.74
9855.66 90.69 127.75 4,071.27 1,853.85 S 4,424.89 E -1853.85 1.32
9949.99 90.89 128.05 4,069.97 1,911.79 S 4,499.32 E -1911.79 0.38
10041.68 90.55 128.24 4,068.82 1,968.41 S 4,571.42 E -1968.41 0.42
10135.10 90.92 128.18 4,067.62 2,026.19 S 4,644.82 E -2026.19 0.40
INSITE V8.1.0 Page 3Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
10228.46 90.96 128.10 4,066.09 2,083.84 S 4,718.24 E -2083.84 0.10
10321.95 88.67 126.56 4,066.39 2,140.53 S 4,792.57 E -2140.53 2.95
10415.28 88.91 126.64 4,068.36 2,196.16 S 4,867.48 E -2196.16 0.27
10508.70 90.16 126.57 4,069.12 2,251.87 S 4,942.47 E -2251.87 1.34
10602.11 90.27 126.11 4,068.77 2,307.22 S 5,017.71 E -2307.22 0.51
10695.44 90.71 125.43 4,067.97 2,361.77 S 5,093.43 E -2361.77 0.87
10788.87 89.75 124.55 4,067.60 2,415.35 S 5,169.97 E -2415.35 1.39
10882.34 88.40 125.48 4,069.10 2,468.97 S 5,246.51 E -2468.97 1.75
10975.78 87.85 125.79 4,072.16 2,523.38 S 5,322.41 E -2523.38 0.68
11069.14 88.53 124.62 4,075.11 2,577.17 S 5,398.66 E -2577.17 1.45
11162.53 90.59 125.16 4,075.83 2,630.59 S 5,475.26 E -2630.59 2.28
11255.91 90.39 125.31 4,075.03 2,684.46 S 5,551.53 E -2684.46 0.27
11349.32 90.39 125.30 4,074.39 2,738.44 S 5,627.75 E -2738.44 0.01
11442.68 90.46 124.75 4,073.70 2,792.02 S 5,704.20 E -2792.02 0.59
11536.12 90.29 124.63 4,073.09 2,845.20 S 5,781.03 E -2845.20 0.22
11629.49 90.85 124.30 4,072.16 2,898.04 S 5,858.01 E -2898.04 0.70
11723.21 87.95 123.15 4,073.14 2,950.06 S 5,935.94 E -2950.06 3.33
11816.23 87.98 123.85 4,076.44 3,001.37 S 6,013.46 E -3001.37 0.75
11910.06 90.90 124.15 4,077.36 3,053.83 S 6,091.24 E -3053.83 3.13
12003.49 89.64 122.66 4,076.92 3,105.27 S 6,169.23 E -3105.27 2.09
12096.80 91.07 123.30 4,076.34 3,156.06 S 6,247.50 E -3156.06 1.68
12190.26 91.89 123.24 4,073.93 3,207.31 S 6,325.61 E -3207.31 0.88
12283.71 90.20 123.84 4,072.23 3,258.93 S 6,403.49 E -3258.93 1.92
12377.14 91.90 125.46 4,070.51 3,312.04 S 6,480.33 E -3312.04 2.51
12470.48 91.44 125.47 4,067.79 3,366.17 S 6,556.32 E -3366.17 0.49
12564.36 91.41 125.83 4,065.46 3,420.87 S 6,632.58 E -3420.87 0.38
12657.28 90.59 127.57 4,063.84 3,476.39 S 6,707.07 E -3476.39 2.07
12750.61 92.12 129.67 4,061.63 3,534.62 S 6,779.96 E -3534.62 2.78
12843.97 90.64 129.28 4,059.38 3,593.96 S 6,852.00 E -3593.96 1.64
12937.32 90.75 128.66 4,058.25 3,652.66 S 6,924.57 E -3652.66 0.67
13031.68 90.20 128.38 4,057.47 3,711.43 S 6,998.40 E -3711.43 0.65
13126.02 90.48 127.83 4,056.91 3,769.64 S 7,072.63 E -3769.64 0.65
13217.36 90.77 127.26 4,055.91 3,825.30 S 7,145.05 E -3825.30 0.70
13310.79 90.83 127.33 4,054.61 3,881.91 S 7,219.37 E -3881.91 0.10
13404.21 90.68 127.14 4,053.38 3,938.43 S 7,293.74 E -3938.43 0.26
13498.65 90.38 126.62 4,052.50 3,995.10 S 7,369.28 E -3995.10 0.64
13591.01 89.51 125.59 4,052.59 4,049.53 S 7,443.90 E -4049.53 1.46
13684.40 89.71 124.91 4,053.23 4,103.42 S 7,520.16 E -4103.42 0.76
13777.77 89.82 124.24 4,053.61 4,156.41 S 7,597.04 E -4156.41 0.73
13871.21 88.97 124.81 4,054.60 4,209.36 S 7,674.02 E -4209.36 1.10
13964.69 87.72 124.75 4,057.30 4,262.66 S 7,750.76 E -4262.66 1.34
14058.03 87.17 124.47 4,061.46 4,315.63 S 7,827.51 E -4315.63 0.66
14151.09 89.72 125.12 4,063.98 4,368.71 S 7,903.89 E -4368.71 2.83
14244.44 89.78 124.20 4,064.39 4,421.79 S 7,980.68 E -4421.79 0.99
14337.87 90.44 123.33 4,064.21 4,473.72 S 8,058.34 E -4473.72 1.17
INSITE V8.1.0 Page 4Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
14431.18 88.97 123.03 4,064.69 4,524.79 S 8,136.44 E -4524.79 1.61
14524.62 90.72 123.89 4,064.94 4,576.30 S 8,214.39 E -4576.30 2.09
14618.05 90.87 123.54 4,063.65 4,628.16 S 8,292.10 E -4628.16 0.41
14711.43 90.41 124.36 4,062.60 4,680.30 S 8,369.55 E -4680.30 1.01
14804.83 90.28 125.87 4,062.04 4,734.02 S 8,445.95 E -4734.02 1.62
14898.11 90.29 126.57 4,061.58 4,789.14 S 8,521.20 E -4789.14 0.75
14992.09 89.68 125.81 4,061.60 4,844.63 S 8,597.05 E -4844.63 1.04
15085.53 90.08 125.75 4,061.80 4,899.26 S 8,672.85 E -4899.26 0.43
15151.59 89.57 125.99 4,062.00 4,937.97 S 8,726.38 E -4937.97 0.85
15216.00 89.57 125.99 4,062.48 4,975.82 S 8,778.50 E -4975.82 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (True)
- A total correction of 19.26 deg from Magnetic north to True north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 15,216.00 feet is 10,090.63 feet along 119.55 degrees (True)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.1.0 Page 5Job No:AK-XX-0901412968 Well Name:SP12-SE3 Survey Report
WELL INFORMATION Created On : Aug 11 2014
Customer :ENI Petroleum
Well Name :SP12-SE3 L1
Job Number :AK-XX-0901412968
Rig Name :Doyon 15
Field Name :Nikaitchuq
Country :USA
Survey Report
SURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
0.00 0.00 316.50 0.00 0.00 N 0.00 E 0.00 0.00
40.83 0.00 316.50 40.83 0.00 N 0.00 E 0.00 0.00
114.22 0.46 338.08 114.22 0.27 N 0.11 W 0.27 0.63
129.82 0.50 332.13 129.82 0.39 N 0.17 W 0.39 0.41
159.83 0.54 330.96 159.83 0.63 N 0.30 W 0.63 0.14
191.44 0.87 309.86 191.44 0.92 N 0.55 W 0.92 1.31
221.82 1.39 327.30 221.81 1.37 N 0.93 W 1.37 2.03
252.46 1.10 327.34 252.44 1.93 N 1.29 W 1.93 0.95
283.44 1.79 323.97 283.41 2.57 N 1.73 W 2.57 2.24
314.47 2.82 309.39 314.42 3.45 N 2.61 W 3.45 3.79
345.15 3.90 312.14 345.04 4.63 N 3.96 W 4.63 3.56
389.81 5.33 314.45 389.56 7.10 N 6.57 W 7.10 3.23
451.49 7.51 317.76 450.85 12.09 N 11.33 W 12.09 3.58
544.38 11.58 314.38 542.43 23.11 N 22.08 W 23.11 4.42
636.94 13.40 315.27 632.80 37.23 N 36.26 W 37.23 1.98
730.31 16.67 317.72 722.96 54.83 N 52.89 W 54.83 3.57
823.74 20.61 319.33 811.47 77.23 N 72.63 W 77.23 4.25
917.05 25.09 320.44 897.44 104.95 N 95.95 W 104.95 4.82
1010.60 28.90 320.05 980.78 137.58 N 123.11 W 137.58 4.08
1103.96 32.09 320.42 1,061.22 174.00 N 153.40 W 174.00 3.42
1197.35 34.23 321.14 1,139.39 213.58 N 185.69 W 213.58 2.33
1290.72 35.84 317.40 1,215.85 254.15 N 220.68 W 254.15 2.87
1348.98 38.80 316.24 1,262.18 279.90 N 244.85 W 279.90 5.22
1442.46 42.12 316.19 1,333.29 323.69 N 286.82 W 323.69 3.55
1535.80 41.55 318.37 1,402.84 369.41 N 329.05 W 369.41 1.67
1628.84 40.33 316.32 1,473.13 414.25 N 370.35 W 414.25 1.95
1722.21 43.92 314.72 1,542.37 458.91 N 414.24 W 458.91 4.01
1815.64 45.47 313.91 1,608.78 504.81 N 461.26 W 504.81 1.77
1908.95 44.23 314.72 1,674.93 550.77 N 508.35 W 550.77 1.46
2002.39 42.88 314.61 1,742.65 596.03 N 554.14 W 596.03 1.45
INSITE V8.1.0 Page 1Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
2095.82 40.71 316.69 1,812.30 640.54 N 597.68 W 640.54 2.76
2189.20 42.97 322.78 1,881.90 688.06 N 637.84 W 688.06 4.98
2282.60 43.58 329.94 1,949.94 741.31 N 673.24 W 741.31 5.29
2375.88 38.84 333.46 2,020.11 795.34 N 702.44 W 795.34 5.66
2469.25 33.76 333.07 2,095.33 844.70 N 727.28 W 844.70 5.45
2562.66 31.41 331.67 2,174.03 889.27 N 750.59 W 889.27 2.64
2656.08 25.78 332.63 2,256.02 928.77 N 771.50 W 928.77 6.05
2749.36 20.43 334.86 2,341.79 961.55 N 787.76 W 961.55 5.81
2801.15 19.87 344.66 2,390.43 978.22 N 793.93 W 978.22 6.60
2883.00 19.00 354.00 2,467.63 1,004.89 N 799.00 W 1004.89 3.94
2947.38 17.69 1.31 2,528.75 1,025.10 N 799.87 W 1025.10 4.11
2978.97 16.93 7.87 2,558.91 1,034.46 N 799.13 W 1034.46 6.63
3008.92 16.52 12.65 2,587.59 1,042.93 N 797.60 W 1042.93 4.79
3102.35 17.14 31.95 2,677.09 1,067.59 N 787.40 W 1067.59 5.99
3195.78 19.18 47.01 2,765.91 1,089.75 N 768.88 W 1089.75 5.46
3289.07 19.34 57.01 2,854.00 1,108.62 N 744.70 W 1108.62 3.54
3382.45 22.59 66.96 2,941.22 1,124.07 N 715.21 W 1124.07 5.15
3475.86 25.48 79.28 3,026.58 1,134.84 N 678.93 W 1134.84 6.18
3569.19 29.15 84.34 3,109.50 1,140.81 N 636.57 W 1140.81 4.65
3662.60 34.16 87.21 3,188.99 1,144.34 N 587.70 W 1144.34 5.60
3756.02 37.97 87.46 3,264.49 1,146.89 N 532.77 W 1146.89 4.08
3849.37 38.92 88.63 3,337.60 1,148.86 N 474.77 W 1148.86 1.28
3942.80 43.07 92.81 3,408.12 1,148.00 N 413.53 W 1148.00 5.32
4036.20 45.01 97.22 3,475.27 1,142.28 N 348.89 W 1142.28 3.88
4129.52 48.76 100.14 3,539.05 1,131.95 N 281.58 W 1131.95 4.62
4222.91 51.13 102.28 3,599.15 1,118.04 N 211.48 W 1118.04 3.08
4316.28 56.25 104.41 3,654.42 1,100.63 N 138.31 W 1100.63 5.78
4409.66 61.33 104.94 3,702.79 1,080.40 N 61.08 W 1080.40 5.46
4503.10 61.23 104.96 3,747.69 1,059.26 N 18.09 E 1059.26 0.11
4596.45 61.97 105.09 3,792.09 1,037.97 N 97.40 E 1037.97 0.80
4689.90 63.60 107.76 3,834.84 1,014.46 N 177.10 E 1014.46 3.08
4783.24 66.03 109.97 3,874.56 987.14 N 257.01 E 987.14 3.37
4876.70 69.54 112.85 3,909.89 955.54 N 337.53 E 955.54 4.72
4970.14 75.78 115.47 3,937.73 919.02 N 418.85 E 919.02 7.19
5278.32 83.39 104.76 3,993.56 815.35 N 702.93 E 815.35 4.21
5371.76 83.79 108.41 4,004.00 788.85 N 791.91 E 788.85 3.91
5465.15 85.32 111.30 4,012.86 757.27 N 879.34 E 757.27 3.49
5558.61 87.38 113.07 4,018.81 722.06 N 965.69 E 722.06 2.90
5651.98 86.78 115.45 4,023.57 683.75 N 1,050.70 E 683.75 2.63
5745.47 85.80 117.93 4,029.62 641.85 N 1,134.05 E 641.85 2.85
5838.82 86.99 120.42 4,035.49 596.43 N 1,215.38 E 596.43 2.95
5932.18 89.38 123.66 4,038.45 546.94 N 1,294.47 E 546.94 4.31
6025.58 89.47 125.07 4,039.38 494.22 N 1,371.56 E 494.22 1.51
6118.98 90.27 126.38 4,039.60 439.69 N 1,447.38 E 439.69 1.64
6212.38 90.27 127.50 4,039.16 383.56 N 1,522.03 E 383.56 1.20
INSITE V8.1.0 Page 2Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
6305.80 90.80 124.87 4,038.28 328.41 N 1,597.42 E 328.41 2.87
6399.23 89.16 126.08 4,038.32 274.19 N 1,673.50 E 274.19 2.18
6492.65 86.87 127.81 4,041.55 218.08 N 1,748.11 E 218.08 3.07
6586.00 86.42 128.36 4,047.01 160.60 N 1,821.46 E 160.60 0.76
6679.35 87.07 127.82 4,052.31 103.11 N 1,894.81 E 103.11 0.90
6772.75 88.00 127.78 4,056.33 45.91 N 1,968.55 E 45.91 1.00
6866.09 88.61 128.91 4,059.09 11.97 S 2,041.72 E -11.97 1.38
6959.47 89.76 130.29 4,060.42 71.48 S 2,113.66 E -71.48 1.92
7052.93 87.84 129.30 4,062.38 131.28 S 2,185.45 E -131.28 2.31
7146.39 87.85 129.03 4,065.89 190.27 S 2,257.86 E -190.27 0.29
7239.67 89.12 126.04 4,068.36 247.07 S 2,331.79 E -247.07 3.48
7333.11 88.97 124.72 4,069.92 301.16 S 2,407.96 E -301.16 1.42
7426.51 89.82 126.74 4,070.90 355.70 S 2,483.77 E -355.70 2.35
7519.92 88.68 125.38 4,072.13 410.68 S 2,559.28 E -410.68 1.90
7613.34 88.96 125.38 4,074.05 464.75 S 2,635.43 E -464.75 0.30
7706.73 89.43 126.15 4,075.36 519.33 S 2,711.20 E -519.33 0.97
7800.10 89.87 124.63 4,075.93 573.40 S 2,787.31 E -573.40 1.69
7893.61 90.64 124.36 4,075.52 626.36 S 2,864.38 E -626.36 0.87
7987.01 90.96 124.01 4,074.21 678.83 S 2,941.64 E -678.83 0.51
8080.30 90.57 123.36 4,072.97 730.57 S 3,019.26 E -730.57 0.81
8173.73 91.16 123.17 4,071.56 781.81 S 3,097.37 E -781.81 0.66
8267.18 90.98 124.26 4,069.81 833.67 S 3,175.08 E -833.67 1.18
8360.53 90.46 124.55 4,068.64 886.41 S 3,252.10 E -886.41 0.64
8453.94 89.71 125.19 4,068.50 939.82 S 3,328.74 E -939.82 1.06
8547.35 90.03 126.47 4,068.71 994.49 S 3,404.47 E -994.49 1.41
8640.81 90.01 126.46 4,068.68 1,050.04 S 3,479.63 E -1050.04 0.02
8734.21 88.26 125.18 4,070.09 1,104.69 S 3,555.35 E -1104.69 2.32
8827.58 88.54 125.07 4,072.70 1,158.39 S 3,631.69 E -1158.39 0.32
8920.97 88.64 125.19 4,074.99 1,212.12 S 3,708.04 E -1212.12 0.17
9014.51 89.38 126.15 4,076.61 1,266.65 S 3,784.02 E -1266.65 1.30
9107.87 89.53 127.09 4,077.50 1,322.34 S 3,858.95 E -1322.34 1.02
9201.20 90.18 127.06 4,077.73 1,378.60 S 3,933.41 E -1378.60 0.70
9294.54 89.31 127.04 4,078.15 1,434.84 S 4,007.91 E -1434.84 0.93
9387.93 88.62 127.08 4,079.84 1,491.11 S 4,082.42 E -1491.11 0.74
9481.41 90.43 127.88 4,080.61 1,547.99 S 4,156.59 E -1547.99 2.12
9574.80 89.36 126.31 4,080.78 1,604.31 S 4,231.08 E -1604.31 2.03
9668.23 86.61 126.20 4,084.07 1,659.53 S 4,306.37 E -1659.53 2.95
9761.56 89.06 126.25 4,087.59 1,714.64 S 4,381.60 E -1714.64 2.63
9854.98 89.84 125.88 4,088.49 1,769.63 S 4,457.11 E -1769.63 0.92
9948.43 91.07 125.31 4,087.75 1,824.02 S 4,533.10 E -1824.02 1.45
10041.83 89.22 124.59 4,087.51 1,877.52 S 4,609.65 E -1877.52 2.13
10135.25 90.07 123.82 4,088.09 1,930.04 S 4,686.91 E -1930.04 1.23
10228.61 90.07 123.59 4,087.98 1,981.84 S 4,764.57 E -1981.84 0.25
10322.10 89.54 123.48 4,088.29 2,033.49 S 4,842.50 E -2033.49 0.58
10415.43 90.03 123.68 4,088.65 2,085.11 S 4,920.25 E -2085.11 0.57
INSITE V8.1.0 Page 3Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
10508.85 90.30 125.22 4,088.38 2,137.96 S 4,997.29 E -2137.96 1.67
10602.26 89.89 125.99 4,088.22 2,192.34 S 5,073.23 E -2192.34 0.93
10695.59 89.35 123.58 4,088.84 2,245.58 S 5,149.88 E -2245.58 2.65
10789.02 90.77 126.72 4,088.74 2,299.36 S 5,226.26 E -2299.36 3.69
10882.49 92.21 127.12 4,086.31 2,355.49 S 5,300.96 E -2355.49 1.60
10975.93 92.98 127.22 4,082.08 2,411.88 S 5,375.34 E -2411.88 0.83
11069.29 92.33 126.36 4,077.76 2,467.73 S 5,450.02 E -2467.73 1.15
11162.68 92.16 125.79 4,074.10 2,522.68 S 5,525.45 E -2522.68 0.64
11256.06 90.19 125.35 4,072.18 2,576.99 S 5,601.38 E -2576.99 2.16
11349.47 89.79 125.53 4,072.20 2,631.15 S 5,677.49 E -2631.15 0.47
11442.83 89.58 125.70 4,072.71 2,685.52 S 5,753.38 E -2685.52 0.29
11536.27 90.01 127.05 4,073.05 2,740.93 S 5,828.61 E -2740.93 1.52
11629.64 90.98 126.84 4,072.24 2,797.05 S 5,903.23 E -2797.05 1.06
11723.09 91.31 126.21 4,070.37 2,852.66 S 5,978.31 E -2852.66 0.76
11816.48 90.57 126.24 4,068.84 2,907.84 S 6,053.64 E -2907.84 0.79
11910.21 89.98 125.51 4,068.39 2,962.76 S 6,129.59 E -2962.76 1.00
12003.64 89.91 125.36 4,068.48 3,016.93 S 6,205.71 E -3016.93 0.18
12096.95 89.86 125.10 4,068.67 3,070.76 S 6,281.93 E -3070.76 0.28
12190.41 88.45 124.57 4,070.05 3,124.14 S 6,358.63 E -3124.14 1.61
12283.86 87.51 124.85 4,073.34 3,177.32 S 6,435.41 E -3177.32 1.05
12377.29 86.80 123.71 4,077.98 3,229.87 S 6,512.51 E -3229.87 1.44
12470.63 87.12 124.52 4,082.93 3,282.15 S 6,589.68 E -3282.15 0.93
12564.07 89.17 124.64 4,085.95 3,335.15 S 6,666.56 E -3335.15 2.20
12657.43 91.23 124.85 4,085.63 3,388.36 S 6,743.27 E -3388.36 2.22
12750.76 90.44 125.04 4,084.27 3,441.81 S 6,819.77 E -3441.81 0.87
12844.12 90.40 124.74 4,083.58 3,495.21 S 6,896.34 E -3495.21 0.32
12937.47 90.32 124.57 4,083.00 3,548.29 S 6,973.13 E -3548.29 0.20
13030.86 90.90 125.20 4,082.00 3,601.70 S 7,049.73 E -3601.70 0.92
13124.14 90.68 125.50 4,080.72 3,655.66 S 7,125.81 E -3655.66 0.40
13217.51 90.42 125.31 4,079.82 3,709.76 S 7,201.91 E -3709.76 0.34
13310.94 90.38 125.30 4,079.17 3,763.75 S 7,278.15 E -3763.75 0.04
13404.36 91.12 125.31 4,077.95 3,817.74 S 7,354.39 E -3817.74 0.79
13497.80 90.24 125.44 4,076.84 3,871.83 S 7,430.57 E -3871.83 0.95
13591.16 90.18 125.44 4,076.49 3,925.96 S 7,506.63 E -3925.96 0.06
13684.55 89.83 125.04 4,076.49 3,979.85 S 7,582.91 E -3979.85 0.57
13777.92 89.30 125.16 4,077.19 4,033.53 S 7,659.30 E -4033.53 0.58
13872.08 92.40 125.52 4,075.80 4,087.98 S 7,736.09 E -4087.98 3.31
13964.84 92.74 123.82 4,071.64 4,140.70 S 7,812.30 E -4140.70 1.87
14058.18 92.10 123.45 4,067.70 4,192.35 S 7,889.94 E -4192.35 0.79
14151.93 90.96 122.72 4,065.19 4,243.51 S 7,968.46 E -4243.51 1.44
14244.59 91.44 123.47 4,063.25 4,294.09 S 8,046.07 E -4294.09 0.96
14338.02 92.62 124.62 4,059.94 4,346.36 S 8,123.43 E -4346.36 1.76
14431.33 90.48 123.95 4,057.42 4,398.90 S 8,200.50 E -4398.90 2.40
14524.77 89.61 124.86 4,057.35 4,451.70 S 8,277.59 E -4451.70 1.35
14618.20 90.49 126.02 4,057.27 4,505.87 S 8,353.71 E -4505.87 1.56
INSITE V8.1.0 Page 4Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
14711.58 90.93 126.61 4,056.11 4,561.17 S 8,428.95 E -4561.17 0.79
14804.98 90.78 126.39 4,054.71 4,616.72 S 8,504.02 E -4616.72 0.29
14898.26 90.01 126.33 4,054.07 4,672.02 S 8,579.13 E -4672.02 0.83
14991.63 89.93 125.80 4,054.12 4,726.99 S 8,654.61 E -4726.99 0.57
15085.04 90.12 125.46 4,054.08 4,781.40 S 8,730.53 E -4781.40 0.42
15180.31 89.99 124.92 4,053.99 4,836.30 S 8,808.39 E -4836.30 0.58
15245.00 89.99 124.92 4,054.00 4,873.33 S 8,861.43 E -4873.33 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (True)
- A total correction of 19.26 deg from Magnetic north to True north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 15,245.00 feet is 10,113.08 feet along 118.81 degrees (True)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.1.0 Page 5Job No:AK-XX-0901412968 Well Name:SP12-SE3 L1 Survey Report