Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout215-049 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. �1 J - 04q Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: //olor Items: ❑ Maps: p�Grayscale Items: 1. gs: v❑ Poor Quality Originals: E Other: ❑ Other: BY: Maria Date: T1.94 1 S /s/ r4P Project Proofing BY: Maria Date: O 4,(0J 16-' lsl id Scanning Preparation U- x 30 = /c7/0 + q = TOTAL PAGES / 0-7 (Count does not include cover she t ifyi BY: Date: /s/ ) Production Scanning Stage 1 Page Count from Scanned File: 1 30 (Count does include cover heet) Page Count Matches Number in Scanning Preparation: YES NO BY: Date: i31.1,g1i/s' /s/ Vid f) Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: 1110 NO TOTAL PAGES: 1.--\ Digital version appended by: Meredith Michal Date: g/1-7.tic /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES:304 Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o o DI DI cv o on in C)) Z C LOel 0 O V V O 0 N Lt WI CC OA Cil 76 11.1 CD _U y 2 (n 2I r •a• 2CV CVI 2I N. CI CI CI CV aD }I (0 �' �I �I 0 N N T co T 0 (n a I Oa O 2I O O 0 '� Cl) N N(n o) o) (n (n ct co co fn [-. Z Z E o (o 0) o o I o o o F. N N WI w -I w EI w WI w WI w�I w WI w WI w WI Q f0 in T (/) a) co a) co w co w (n N (/) T U) T. CO > U Nr O NO O Uo O y O O:, O:, O•a) a co IZ co a N a N a a 0 a co a co J w O (n N (n O co O (n o (n Vco _ co N co v /) N O C 0 (1) U 0 a) a) I a) a) N,, 0 O C (I,2' a)W a)W a)W 6 c 0 a) a)a'- a)Ce NCL-o o d p Zl LLZI LLZI LLZI LLZI it ca W it Z1 a i oz i Z1 a c a. E �O y �O!� �p �p!� �p E �(jD �pN '_'O o N VE 'c m • -o • = • i •c s c a c v •c c v Z f0 c1 O O(np O(no O`"ci O(/)O O(nci O aO O(1)N- 17 O(nh O V >N V> N > N > N > N V W N V 1 7 5 5 U 7 Ce 0 �_ J a) I v N I v a) I v a) _I v a) I v a) I V a) I o a)i. I - _y_10 WJE WJE WJr- WJ.- WJE WJ— WJ1 CLI-J a WJ% C7 O V c 'p l!') l0 l0 L() U) U) )A )A CL . 0 0 0 E. 0 E. 0 co W @ N N N N N N N N N W V O O O O O O O O O Ce a @ d p co m m (o (o m (o (0 4.cc 9_ w n d C) J P > _ _ W o � 0 Q .. a N co Tio v N J o. w CL in O 0 d c t 0 G Cr.N o ego Ta.� N fn 0 a) V o Q � z no ° W R iaa 11 ' fn u7 o N o Oo J aN to of CO0 Ti a ;25 .1.--)0.,„a0 z J M W O 0 O < Z o ✓) W I— a) Z Q C a Z E oa) U O) a E J a co0 Z z no a) (0 (0 (o (0 (0 m a) • m C E 0 0 0 0 0 0 0 0 0 o v re Z Ta m m m w m m m m in _O1 O) co o) o) O) _O _O _m O Z O ._ 0 0 0 O 0 0 0 0 0 > _O J 1... y Q N N N N N N N N N 0 I- h- �y = 6 0) E O m m m m a, O O O in Q Z . C 0 10 = (r)N N N N N N N N N N CL p 0 C W a Z O Q oW E l0 E 2 0 N Z « tr. 0 15 c �LL o Nil. a) U 15 Z W o 2 U 0 0 0 0 0 U U 0 v E 5 a H J 0 0 U H 0. — rn:° C. 0 0 0 0 0 O 0 0 0 a Ce 0 IT 3 -1oF w w w w w w w w w o • "' 9 0 0 t0 N •• tri N Nr.. . N M Z CC !/) 010 M 117 Ln Ln LU () N N a) a. 0. a . w • w w OD Cil N U ;CI c c 0J 4 4 4 4 4 W w CC a w w CC a W w CC a LO D I it it J 0 O O O O a C7 0 O a U' 0 D W 0 T a a a �' a a a a a o 0 0 > 0 0 0 > 0 0 0 > 40 0 U) U) W cn u) Un co co M 2 2 1— 2 2 2 1— 2 2 2 H 6 0 <ci co < N N N N NNNNNNNNNNNN H E E E Z1.0 10 W Un co C C C C LU Ln Ln Ln Ln Ln Ln LU Ln Ln L01.0 E: w w w N a) N N a) W W W W W W W W LU W W W a cn a U) U) 0 U) U) U) U) U) cn U) v) U) cn U CO 4 .... 4 4 D it ll it IL it 4 4 4 4 4 4 4 4 4 4 4 4 a w a aI rn 0 0 0 0 0 0 0 0 0 0 0 O 0 m m m a� a a a a a a a a a a a a J Un N U/) CO F (n- (/) N U) !/) (/) U) (1) (/) (/) co (/) co (/) (/) (/) co (/) �L co coCD C1J co O' a)w a) co �' LO (6 N CO to a) a) N a) a) N a) a) N a) a) a) LL IL U- X 0 co 0 0 0 W 0 0 it lL lL it 11 LL LL LL 11 U. it L co °0 0.0 0 w ZU 0 0 g C 0 E 0 (a 0 o g 0 0 0 0 0 0 0 0 0 0 C) > 'c — Ea 'c x Otti 'c m 'c 'c a) c- 'c w 'c 'c 'c 'c 'c 'c 'c 'E 'E 'E 'E 'E Z co oU o oa vo of o 0 0 0 0 059 0 0 0 0 0 0 0 0 0 0 0 0 0 U Iii U>o— U C 0 < U 2 U L U L U V U 0 0 0 0 0 0 0 0 0 0 0 0 a) rn a) 0 w a)L a) a)-c a) 0 a) E a) a) a) a) a) a) a) a) a) a) a) a) • m W J o W'rn W(A N 2 W O W J W J W 2 W F— W LU LU LU LU LU LU LU LU W LU W 0 ~ V r In In co In in In In In In In In In In In In Ln Ln Ln In CL 0 0 0 0 0 0 E. 0 0 0 0 0 0 0 0 0 0 0 0 0 WN N N N N N N N N N N N N N N N N N N N N d _o o o r� F- F F- F- r` r` r` F- F- r- r- F- r` F- F- F LL p (D (O LO (D (O (O LO (O CO CO CO CO CO CO CO CO CO CO CO CO W C o.. paQ c. C) W Q Z O- ,_ rn rn o < .�. N C N u) o n n a co 1 en c o vco voo o G G O O O N Lh N O y c+) CO ON p• in E V N 0 CO 0 JCA a n J td Ln 0. W N LU v 0 O N a m LO m aia M I O 0 Cn I— o Q c Z O ra) Q G d Q Z E O co m 0 c (Eo 0 Z Un _ co co co N co co co co co co co to CO LO N CO td CO CO co co a) co co co V co co co co co co co N as co N co co CO CU fo N 00 0 0 0 N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ✓ To co co I co co co co co co co co Ca CO N CO N CO CO a) (o w Y m rn rn a _rn rn _rn rn _rn o) _rn _rn rn o) rn o) rn o) _rn m _rn O 0 0 0 0 J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c0 > N N N N Ln Ln Ln Ln L() Ln Ln Ln Ln Ln Ln Ln 117 Ln 117 Ln Ln O H O) O) O) O Oa) Oa) o m o m m m m m a, m a) Oa) o m m in Ln Ln in in Ln in Ln in Ln L() L() L() LL) Ln In Ln Lf) Ln Ln Ln Ln N N N N N N N N N N N N N N N N N N N N N N O N 2 :•-• - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C7 0 co▪ 0 0 0 0 p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 0. M W w W J W W W w w LU LU LU W LU LU LU LU W W W W 0 0 0 C N 0 C Q V. en O C ) N Z J a, C 0 } } no o O C C J W � /� Q <O 0) OI J Ci)L >•• I 'l4�/J T F � 0 �' o N` C O W C7 LL LL 6 to 4 Cl) O Q J F c). Z 2 2 2 I- d L L O _ _ _ _ fn U d id 1 N(N N N a O O O g. 0)0) 0) 0) D o o 0 I cc c c = 0 0 J J 0 0 0 O O 0 O O.J J J 0-I 0) • O (7 LO co 0 c 0 Y 0) CO CO CO C CO C Z!n C < Q U) 00 0000 0 c 41 1 /Z 1, • co co co co ii 4)(8 `/ co r/�/ V C77o> >> > �W V CO y O Ce O LLO)(nJU)W CO W N2 co o/ • li 1 I.V q U o E M E in W ¢ N 7 W H Z rri IX • ti ao N O7 N - 'O N m in W V1 O) m a) Z J > 1� E 3 E V W O E co Z u un 'o o o Cl) 0 16 N J O. c 11 J 0. d a E O co 2 U U 0- o � � N 11 /O E w M V N U \����11JJJJ' C 4, m o J >-0C } E M Q 0 o v ato N O Ili CNC v. l0 I- H _ y o1111 O N co N C Z a m N °' 0 Cl)i E m O i IN c o N- E Cl) • LO if) C .O- N 0 _I C C 11111 1 < Z CCl) O I I— Z O C U 0. �i a O O O7aI Z OO O T E U 1� c 0 2 0 Z 0) I m y coO O co C Q N V I-p = I '11 Z)ze 6--0 0 J O O m o ~ rn rn w co n O m IL N O12 N N n m C c 1 y c CC O L 2 w EE Z a°i N Y W m d' a- 0 H co to 0 0 F m U 0 C O) O H c Z C CO 0 N v 2 d Q o o Q o 0 c C U w • U U a o a n 2 w E 1 a UO d II o o m Z o 2 a 13 °� 12 0 o Tari p ' o o d a. J J 3 _ 0 a. 0 0 0 U v 5049 215037 25945 25944 HAL LIBURTON DATA LOGGED Sperry rills -/ 1/2015 M.K. BENDER To: Alaska Oil and Gas Conversation Commission 333 W 7th Ave Suite 100 Anchorage, AK 99501 Attn: Meredith Guhl ^c From: Sperry Drilling - Alaska RECEIVED ED Attn: Robert Haverfield JUN 17 2015 6900 Arctic Blvd. Anchorage, AK 99518 AOGCC 907-273-3559 Office 907-273-3535 Fax Robert.Haverfield@Halliburton.com Re: Eni Petroleum Well — SP04-SE5 & SP04-SE5 L1 AFE # 6937 Rig — Doyon 15 Spy Island —Nikaitchuq, Alaska Shipment Includes: 1 End of Well Reports 1 Final Data Listing on CD-ROM 1 Sets of Final Logs — for each well contains: • 2" Color Log — Formation Evaluation TVD • 2" Color Log — Formation Evaluation MD • 2" Color Log — Drilling Engineering MD • 2" Color Log — Gas Ratio MD Received By: Print Name MALL-iz-ev Oee Sign Name Date Please sign acknowledgement of receipt - email, fax, or mail back. Thank you. 215049 RECcd\ 2 5 9 1 2 SchiumbergerUN 1 0 9(11F Transmittal#: 10JUN15-SPO1 Drilling & Measurements DATA LOGGED MWD/LWD Log Product Delivery tvl`K.ZNDR Customer: ENI Operating Co. Inc.Alaska Dispatched To: Makana Bender Well No: SP04-SE5 Ll Date Dispatched: 10-Jun-15 Job#: 15AKA0063 Dispatched By: Stephanie Pacillo Well/ Product Hardcopy Digital Copy E-Delivery Date Product 5 Contents on CD N/A VISION*Resistivity 2"MD x x VISION*Resistivity 2"TVD x x VISION*Resistivity 5"MD x x VISION*Resistivity 5"TVD x x VISION*Resistivity 5"MD IMAGE x x Digital Data N/A Contents on CD N/A ASCII/DLIS x Survey 1 Contents on CD ASP Final Survey x x EOW CD 1 Contents on CD Data:DLIS/ASCII x Graphics:PDF x Survey:PDF/xls x Please sign and email a copy to: Please sign and email a copy to: joshua.zuberenipetroleum.com AlaskaPTSPrintCenter@slb.com Attention:Joshua Zuber Atte tion:Stephanie Pacillo Received By: — C 0) ,....7N a CD 0 Ul m N N N d N Y. N m.d r- r m o.m m N m N mmm d m o O,-d .0 �=-v..- �Mooto mai, v.vmo tO..-. 00000 O.YN r'Opmoo'-m Co. 0) ••' cm1 -v. N d.0. m d 0 Omo d m moray,- W Q. m m m aD m o.-N an d m r m O N d., MON,. WON., m.-m.0 r O e- J r.. .n moo m ... .rani 600 o0000 ..Cno 00 .N N Nrr N .w... ....N o..rmp o Nrq.. . . . .. d 00 66666 00000 ;;:;; ;;;;; 0 6 rr rrrrr rrrrn rrrrr rmaA ; : ;0..m a. 0 rr O O.m m ONi00m m0 rd ,- v°p qOr Or Ofm °r Orm°Nim ...00 N O mtO, mOrOmm rO C MM.,. ..... VV.,. d. m .....m .. N o 00000 O m M m 03 m m.m 00000 0 0 0 m 00000 m m m 00000 m W 0. m 0 _ J 00000 00 A m 00000 W W N 00i O0i0 W q 0 V MMOMM a 0 .v a a 0 0 0 .O O d d d d OM a 0 a a v a 0 0 Y d d d d d MOMMO qd d v 0 jn w^m m .-.N o m m .-N m m m m•- 0 m.-0 m! m C`e,0 coot/ dm d.-r()dm mmmm m.-.1-,,v, mr0 .dam OmOo.- .-d 44466 Oo066 06.-66 .N Od m 6,--.66 M Nm00 d .-rrrrr rrrrr roe mneme tpmmmm .mmnm .ovv ddmoMN ILI ..... ..... ..... ..... ..... ..... ..... ..... .. w"dd.-0m mmmm . 00 Odom ..... No m NmN Nd pn m- G C °YYO � Nd m NrnmO. NON^ mN7�o mdmA� OM.-.n o7.mY m. C etc. ac 00,-My .ciNm vtp Nm mm.-N carom 'r m :,• v .V..m to u?V 0 b m..-0r.,n 0000.r g 0060 00. n W 600moo.- r0 ° 0.M 60'10000 Mr 00 mm .PIN Yo Q Z ...... ... .....m m m m m m d n Y.O d ..... s';'4.7-22 d..m ..."• . .. 600 00000 .oral.Yl 00 00000 .0 00 0.... .:0000 ..... o 0. ..... 0..0. O.m. r0°. 9,..,,, CZ) liti; Irma m F¢O m omN ' m d d Nm 6 W 7 . N N r.000 N 6J _ m, . ON -O 3-N, .- d. N O00, ,0OW.... 0.00 0. .... •-ON'm 66444 en66N^ .-O.-'N 0.. dor '..- im 64 1.11 17 "i'88,5;22 Ont Omi 00 2m'°2'0 Nam')N d W o M0 mr Nb i0p A 00000-m rmnnam00 Oo 0.889 89 m 4 .-N N .1-,1.? n 6? v r m T 0 -m...,-. m O N 0 0 'M O r.O `y • • •r •r rr r r r • • •re m `@1 0) Y 0, a m o v.- moeN '.Omeim'mannm6000. Om4O 2zo0o0non ummm . . r., MC _ b0] o0Omnom 0Oro^ NNDrmm.-,mm nm m . 40 4 M 'Nmo mn0oMhm'2nNt) d., m m0mr-NY h.rr mm 0 CL o : ( r 6 J E 00 2 m Oi 0. 6.-.r.-0 O^ r and m Nvm)rtor)r 0r0. . d Nom NN.d)n m N0N Y con, In O O O o Y N 0 .-VON. I� ,,,-M, m . ...el..- 0 (/) Q- 8 .22 E I- .-Y a 000000) 664r:6 0 rOvi rNd O d 6.- .-.-. d co W tNEO m O a . m dr 00 .-NNaYO a vann0 tor- r mm Om)0 .-.-NMO mom n r 0 m o E o o r e N° r N c o m v a CO O •-O O C N 000 too r 0 Z O r00= 6 O X O. O OO m= N O -T> m.-6 Kram).-.-.-oo m¢mFO.-> W 0=omm o N°60m0moo 0rmrr m m mmn Od 00 N m m0mm m o mm . oo t [ Q 7 . m.Nd0 Amm 0Nm0N. o 000.-., 64666 064NN N 0C _ -66.,4 76.) O Q Yn0C NN0avO00rmMO �mnOmr2 00 at WCW Mn ( Q> O C Cv 2,- C �/ ` O C L ° iris-, R Ce z C E' E m 2 .1 h C1 O¢r E�'C a S O m vS o D5 T E Q O 2E..9 o w C y o O F a O UCC ' oOCz • LLC✓ CZr' U domdO 060,00 0000Y r 00mm Wor0060Nmm N0NN N m«VC5 : VOO0 CW °-O r NOm060r.:6666NbNr0Od0,0@ �d� Q3 Mftml OOO� a3ECf9c Nm YW � oY _ C • • r r im0N. . oA O .H N r?444 S . , Y 11 0 ›.. f ito.,4 Cffcco �L°�L°Iw` wC'o^ Y 0=0.-O MOm m m WWW,-0 mmm n d r,d m W N.. O.. 0 N 6 0 O M.5,-,6,- `r°m n m 00Or)mm 0.m.N mond O moo dA 00...00 m i- .,v 4M 'r of t66MM 60646 0 6,66 of auaumm as O O a N 0 N 'roost N m 0 d .-m M cr, O N m..- 0.-m O d o m M m 11101111111 W 3 Y .rp r aD m o ..... .....d Mrn '000)0 NNNNN 00000 NN 11114ft V. W W mOOm.-� N.-,.. Om m .-n MMd r.-N m 01ro.-- N m N.O OMO d d Nmn0rY co h7 A Most. m Nm•-m 1dA .- . d001 -Nm 0 0 0,00m66.-4 6M.-M4 n .- d 6N MO N m 0 Ar MMM.-:M d Y mh. Yi<rAayr m 1 > MMOm mmoOO Nm.m 0,mO. •0010. and W F r N N . 0rD . A 0NNN.! 1010 .-.-.-NN NNNNN NNN N OLL Om m M m N N o= Mo.-o ctggNn 2- donee mrmnemo A.� nm.tmq.mn., ramp mv.-vm Yom,. .-nN.-.- 64,-66 .-60, m ooooM MMMMMMM .el.r3 .e3el.e30000 MNor E 0000 000 .mmmm e3 . 000 mm ,.: 15-.!E _ ¢ 4._-2>W Yno t N,-m .-- o m N m • Oo 0o m -0 v m 00.-m0 O m.-m 0, 0 m. A m o^0 E. o n .-m popmm 00'1,6 N dm.-Yd omN� mmmm ao'avmar n0, 6.0. 0E m 0_01/.54 a = 00000 .-.-MM C rM 6O.-cim '466.- MOM.-4 . . . my r 0 .-.-.-mm N MOMOM a M V.V., .d d . ..... W..O.. W. l' . rd r o ca wrun u, 00 Q¢i, 'no A • ar-mm mrmm tr" m_000o '0.00p O _Ya2o. mo0mwzm0mmMzzZooN O E 0 000 0 0 0 d 0 N C 6 m ' n r O m.0 . 0 0.-0 O o m O m 0 m E ` r0 o Am I� 0600 Y N 00 d m 0 ON 000 O Oa4 m0m .-o M.0 n 0 r 60, 6 o r 6 m r O 41-:,54,-: 6 4 6 m 62 nw mw 0ryrm0Otommvm 3-0 ...dm .(3..-,3- m 0 Q - d.. rm '�° .-r p 0, NNNNN NNNNN .....0.-City. 0 0 O m k C N W 2 W> co W e C W W` N «O W J C °.E V •C 'y' my' °: 9 p ° 1F - .3g0:-J. s ITJ• _ ✓ ° y-g-<122 A l a`u_ d!E C C `° i0 '0 m 9 E E w c `V w: o O g1 o 0 > 0 0 0 0 u o r '� °:Ula mYmQmmHUJJUU' > U •K 0 V 0 N O CpNrN Tn NfMN MO2d00VNn rr dNr r2NNN0 .2ANNMa A(0NCOO AV b e-e2O 2„m M e(0 2.”42 Na N N (0N O,N'O N. F ON Maa < MNw0TerNw2N ee Mr aVO 21 ,70E ,..'w 'ApOONVV... .NMNNw 0,. NO..N.MT MO 0ON 0 J 22222 22222 000(00 22220 N2bbNNbbbb2bVV... V.... . N0NM2 22222 22222 22222 2 22 2 2 2 2 2 p22222 2 222 12 r22 dOl 2 NNNNN 010_000 0010`00 NNN N N 00000 N.0000 000 o o r r n O n o�000 r N N N N N o p o oo 00 000 00000 000 n,rr rrrrr r,rrr r,r N V p«pC 1 r 2,O2d 0 N A O. .O d 0n 2 27:437, Q 7 n 2 b M T A O OT Nr OO .7A532°4 O O O m 0) 0010 N m O 2O N N O A A A b O M O A2 o 0 O N b MT N ..N.O. 200b NAewn MO.MT W.NWN MOMrA W,wr.w N2wb0 N.bb. ,VON. mmMr 2 .OO 02.72 '4An7 M dN0 r2 .MOrN 9 2 21A MM.N. nZNGo. 0N.a 3 g4 2r ONe 2r NNO 222 ...NN O T T .2 b b l e e e e M ...NN N w w O T N N w 0 0 J 000 OOOOO OOOOO OOOOO OOOOO 2 222 2 2 22 2 TTTT. 2222% 22222 2.m2 2 22 222 22222 Tn TA 2n .0D 0D tf . .Oi TCP CA CTO avd ddddd 444d4 °;.74'.74 d)e.7 Oe)4 NOS W Oi OI veO ; .°44Oef e Tt.Tee eN4e4e g4Teoe.7 ee.T 0)Oi e40eT eed N T"e O 0 N 2 M.N O A b 0 A Nm 2 2 2 A 000 A M O O M e ,(0(0(0 D M O. O r M. r 2 e.M C T d 0, O r N r 0 2 n O T NI T 2.r 1 10 a N00(00 N.O e r O r N.b T M A 2 rQp A T M,. ..0 0, hvae <'nHrarD ode adO CN•1 M. de OA'e� 0'CpM�N WOLO ON 20002 rTMNO V1�1eD2M N000V NNNvO rM10002 ,7M 000VNT ON2 `M M M OM... d Q d.. .r,2 O T O N N M e t M A 0D m 2 T O O TOO O N M B kr,to r. O OTT O O' N M d 2 2 (0 r N N N N N N N N N N N N N N NN... M MMM M M MMM M Mm... e dee d e d d e e d e d C TO V N CO 01 YNr NMNCCOON ...WO CI CO V V 0 ...MN CO.O-A V 2 3- AQ02N to to. 020.00 W O. C0.00220 L Z N ON N d.0ONO.OM W 002222Traded.- MO O0 ...00 2O O2 NO OM COOMOOAQ�O er pp n A a gmr VrdAO O22,%-0 (0TWM O2 2 2 2 OOOMm NNSmA b...e 4Q4gfl WV--mg tOn, 1.7-07,2 7, 2O2 22222 2...2 22(0(02 022.233 ..2bb. 2222222222 22 2 (02 22222 2D222 2 2iii2 A0A00 ANNO OOOOO OOOOO 00000 0 2000 OOOOO 000 OOO 222 22222 WWWWW i0 2 33 2 CO 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 b b b b. b b b b. b.b.b b b.b. 2 2 2 2 2 WOW m MNd Or,Td .•-m 00 en-T 0Or1' U21�OMT 00,-02 2N�.. N.A2. O.00M bOe ONCO COV OOb AN .2. O =to,to 010 a>000 NN(00M .-(02NN .� O OMC CO O COO, CO CO M(0NOO OMNN2p0.2 COh.O O CD 133003.0, 222 .2d.d ...-N N d�.'�M Q 00N M MM .-�.M O (0NM NN ...NN ..NN. Nm MNM M M..N 0...MO M.20 2. d. 00,x. m 2ONN ,M.ON O,1 O M2. N.w bN e O N.-o Mw... 00.4-0 N NAN O N M N W 0 O M .r 2 N r 0 .M T O O0dOO .NN.. O N O A M e b N r d r OTO N O.w O r C.v..... 2 O..M T w w O O .0w NSM ..2N tON.dM .�,NtO 0.20. .,(4.0 (0 2O Olhmm ..M�. M(000.. Oof 2TO N W..CM .000 OwN OCO CO 1)0O.O N N2Nr N Cq 'b M N r'O 0O. (0200) 0.,., N NNN, ..e N OA.M N O 2N e m 0 O b0)�m .NO N N N.V.. b,m O 0 C wwwwN NN... V O UI., ...N N NNNNN N N N N N N NNNN N 000 M N N N N J N .00.. x 0 M 0 N.O O. .0... 0 33 00 Q O N O.. .0.0 0,m N 0 000,100, NN... 1000.(0 01000 0 0 0 0 ,0000 0 O W Z r M(02 0 d M O(0M r r T M T (0(00 2 2 NN M O.N .,..w d O T N 0 M A M n n N '-A N N O O O A m O OANO U .O nOOd AD. �Ah ',Oiey0TO O0 , VNON 00) WNWOM .. 22 m.dMm rMmd2 O.O.2 m .N OV. O00' NNNONNNMO 000NNNN0 NO.NNNNN NNNN NNMMMM MMMMM NNNNN N N N N N N N N N N N N N N N N w w 0 J N 00,00 .0T 2O 022ND wW,MN O 2N, (0.T T2 p 2O M Y�NO T TO wOO O0,102 NA 20)M AA�t OdC•! 0M 2 OOAMA .,002 1N. M pWA NN0 N,MT0 00me0000 . O.,0 M,e,m 0eN ,NO 4 m2 .NO .,ON. OOO. TON. NTN NN N.N NN.0M . N 0)OMMMMMMOOMM7hM 0MMM .MhM2MMO 0 N NNN NNNNN MMMhM . w N 0O, . Q.O Q M M N T w r. w 1010 T 2 M w.w O ...WO ...NO 'm.2 b O O w N A ,.O N. 0).0 2 N A w 2 2 w 0) 4 -j w 0 0. N,N Q w w Q. O O 1010 M 2 0 b 2 2 m, ,030+. O M.n 2 O 2 O w N b..T N N N Q ,T N M W M N.T M r.- Y r iObCM �Oi,N tM N NNdh IRON �N00�M eN.w m 00 h2 h CO�O1�G e a,.- 0t4 COOT vol m Of oICOOiN COOL M O 0.2 0) .-.N O N 0...N T m r(0 .w d, 0...N mwOOO m m A b b .U1.A b .O.d M N N 0 0 O m m d NNNNNNNNNNNMMMN ...VVVVVV . .V. V.V.'. . ONOOhN N ..... . ...VVV... V.... ii .. .Nn. i 000 '0 C W M W,MAA NOah N h 01 NON CO COO Na OOi N 0000 ..ACO N COO V w.0 m V 00 aD 1� M 0..0 CO NANM V 0.0210. 0 4-411. Or 001 �NIM•l YN OAOOi %- a0O 6.-Orad d m A o5m. d T.-Od d T Oopm N T2 r .t7 NQ aD aO NMCMN .-Oi d CO Oi N 6 0002 ...NoI O , .. 3 �2m Nn1V�rr 10`aQ�, UM1 a0O NM' ,0203 0 aD2M O ,2 NTb 0200 N NMN d O d b. a M.N. ...OA W . <00 ..2 r 1010.. Q N Nw01 0'OD 20004 AAl;CQ CQ «1.q.�CCl N NNN NM eN.(0r ..T Ow `d.Q 00410. MMT. CO WIN,O N ONO M 01103 Mrr UT1 0,0040,013 AMM b NM Nd M ^CO.-00.1 Np OO N NNN.- C0003 2N d 0.d N d N....1 w'r O O (0.O. O M W n A r 0 r.0(0 N r.2 .,N-, aD .-om ,7 � 0 Nror1c NNGr. N2.w, mo:oiao0 o roOhNrMm <O(0.-2 m0NrNN ...MN ..Ow 0MOd2 NNW., ..mm. TTOOO Owwww NOUN MO.O ...AA 0NNNT0.000 0000 00000 00000 00000* NNNNN MMMMM MMMMM M McOO dOede Oeded d0d00 OeOOe eeeOd e0e d 2 O 0•-•-00, .M M T 2 N NNON.. MM 00 0O O N M. N M N O M .0 w O N N000,1 .N N N 0...T ,O.0). 0O.OM ...2 ...NV ...Wm .(0.'AM NO.O, TNeN. 2 TO Om.O O v22.O0 N.O NU00m'000 00' 0 aAm0002 . rrW 000N 0001 Nn N, ,M 03OO ' 0YA0 .. 0N.NNM 0 O00. N. MNNMMMMMMMM 0MNNNNNNN. NNN00 00000VVVVOopaeov00 .NN NNNNN M. M e ri riri Nn Or... ,.O O. Q O 0 Q 1 M .0 2 2 2 b,e, b 1 A A O O O,,. r O.N. N M.M M '2 20 1000.1 M N 002 CO .M.. A CO1 NU)CO.M r MA.O !b.N, (0M 1 N 1 OOO d.N10r 1 e CO2. ..001 N d,CON f 020 NM.1 CO NNM'2 NOON* CO Oi 1.0. NN 0010 214.0 00 0004-4- 00 4-N .2ONe n1A r m. 0000 C. .p 00M000N GC E M M 1 O O 33 2 2 1010,A, 2 m m T O 040104040 00000 0 0 0 1 1 1 1 1 N N C•14,04(4. M M M e V M M M N M M M CO e 2 1 d 33 2 0 1 2 2 1 .O 2.N 0.00. O .Cp. 1 0 ....0 O N w.2 .O O w Q .^O M M M O N e O w.e 0 2 2 �N00 T r0 Mtn lh 0 aG02 d 1,N.0 MNO d, (0T.�N O. N,.O. AA2 e m 0,11-061 O M M.A1. neT T. 2102 222 2220 N .0'0022 kr,COW 2Uri COLO LC,CO CMO CO CO CO'rn ,,AAA rrA An 0303 CO W 0 W 0200 CO,0 m m COMD 002 m mm W W COO W m 0=0,0.1 x 0 N O 1.O N .T M,O .00... A M A w O ,w N O N r O Y O N 0...w O O N O M A N . .0... c.iedm N. M. ON.D7 OOM.ON.DM. OM CD TA ONNm .O.V O ON00NO OAAN . rOhV2(02. N Or000 ONNO .. 01 M.,72. nmmo� NNan� �2��o 0 ,,, A."V. °OmmM.. ...Od ...OW W.... , m .0 r ro fV U m 0 0 0 N N W W W AnNn mN N M N Ap A NO^Mm ONmmM nY0mm m2 2 0 QNNm WrmAQ dOWMM MmMN m^M.m ^mON M^NN0 A2462 mOMr J VA mmmWd rrW^0N^Arm mmm.. ,0.^m A^NMN NYMnm MmAWW mQMAO WOWm0 WMNmN N^'. J NVMOOWWWNWOONOVNAANaN,m. rNMNVO NNA'. OVMVWVOWNWMMVO, MWOWrMYNO NN00m 0^Nm mmm2 2222 Wr nnmVNN74mANANNANm.. N.NNN NNNNN NNY2NvMM NNNNNN..W W.... W.W.. NNmmN l6' N m m m 66 66666 OOOGC 66666 OOOOO 66666 C0000 66666 00000 66666 CGCOG 66666 COLO 6666 r r r r r r r r r r r r r r r r, n r A A A r r n r A A A r r A A r A A A A AAA A r n A r A A AAA A r A r A A A AAA A A A A A N V Jd^2 CmD M.2CD m.^.m 0.M.Mm 2W NW WW NW NW AW rW 0N-000) W 0.--00 .-0-J0,00 W rW nCD OW mW OM D W0000)04 W 0(00(0(0 mW iW WW OW WOW mW N-0 . ! NNW A2 M2^2 W0m W .M2 mNM2 A 9 01^ NN0WNN QN 0 M mN^MN ONMNm mmOm m m^^ AMAWM mmm^M rOM2M rWo WmMmM2 0 WN m^mM r ,mW NMNOm Adm^m nrrON ^NWN WWmOM N2^mY NNMmmN ONnN2 AmMr m ; WN 2rMO MNAVmemo4O;NANrOQO 'VNAMb [ mMWmM rm2MQM^NId2W Am . AMMNOmCW WA M NeMMMrOOm mWOmM rmN;^MW0 a22W O C MYMYM VV vVvVOVO V'oao .of ofoO o366OO ofofofc cooio36O6 oomo6036°3 T- 44 V AdA4 44 444 VdVAVVVVdVAddVAVaddVdaddVVdVVA 4444- 4 yQQeY ea Y yNNT- m^.N 00,00 ^ m A d W 0 N d O O m O m m N N N m^N W A n M N W m d W O W 'N r O m W m O M M M r N W ..MOW YY.^ C j.M d N W M N O M N m. A NON N N{A{p r N O W M a Aa A N{p W W^A Y^W Y m(p N N N(O O A r m A O W m.N M N A^M m M^W m N M N dmd W r.M OmmN QmOAN NOrNM mM� m W V NO1 AHO1N01r dNTrm NO.FM ^Wm0 V N OnmNO re''W W V V (mO,mmm,M .:;LV./12r7 mmmoOtoD moo(MON m(poom0 O W,,, nrrl nnn m W aomro gmmmmm. oro W$A mmo Io mmm. mm mmmm m m m mmm mmmm m m mm0)000)00)0 0)0)000) 00)00)0) 000)0)0) 0000)0) 0000000)000 N NNNN NNN N C WAn Om WON MYmM <mYr OOrhm ONa Ar 7 ( , MOM V mItiMmW(O mnr7.W 7NMMA. 'PN7Mg O, iO01 NO ((0. NCN .- t Z ON dm V MN^ W N M MOA V W MNNrAMOYMMONAOO. . MmO0 V0VMMWMNA0OOMMW.TW NVMONW V , MDr MAW . OMyMr AT OV MN0,, . NNNA^O O2r AM .m AMN ADWAn MMNN^ MOM 00 . m00NNNNNNNN 000 MN MVWNNNNNNNNHHNNNNNN0 .00 0 0 00N mm 00000 00000 00000 00000 00000 00 00000 00000 00000 00000 00000 00000 000 00 WW 00000 00000 00000 WmmmW 00000 (00000 00000 WmmmW 00000 WmWm 2"O W D A N W d 0.00 000 0 m.m r^ 00(0(0* d^O 2^ AMMO m N m r N W A O N N N M m W^ W.0 0^ 'mNmA NO W r a W m M Q J (000 d0A Nm NNM00) A�-A^W M A W W 00040 NMWW W MMO^ l'- 4 0 0)0 O0N0 Y* U) R00.7 D O N O M O^^^ M^^^N N N N N O ^^N 0 O N.M N O O O�- O N O�-'- O N^^0 O O^^^ ^^^^^ N^e^^ O00 N^O-- O O^^ O r al WNW M^M m W O O n M m ^ N A O 0 2 0 2 2 r m M r W P:74°246- W^A. r M^A W N W 2 m A '2232 W 2 A o m d d m M ^ m. N r 0000* O m M N W m M M.0 m O M N N (O^^W M m 0 0 M(O W N N N N m^^m ��N(O� WW V NO O.N(pM .NM WM V W WVA MONO ,.NOM CDN00r, (M.M OM W V A M,V NO MO,AOM NNNN M M W M^ 2 N d N 0 M O r m N 0 0 M W m d^ A W d N 0 ,.NOM N 0 2 M.MAW. MOM.M M O W 0 d 0 m r A N 0 W W 0^2 0 0 0 AN M M.W m A W m 0 0^N M M Q,O.m r W W m O^ ^NMA. .m r W W m 0 W^N 00(0 Y m W A A W m 0 0^N M Y M.m A r W m O O MM M MMM M M MMM d Y d d d d d d d d d d d A N N N N N N N N NNN N N mmm W W mmm W W mmm n n n n r n n A n r n ,,COM J N (000(00 0 m r W m^ .M N W m A M 0. 0)O O A N 0N-000 N 0 n^m m^O O m ^r^r N Y W m 0 A 00000 N m 0^m m m.M W Z i0 O^2 M 040.0.N, WW m m M d 00000 0040)0)04 000400 mmm W O 00(0(0)0) 0(000(0(0) 00-000) (0 A W d M M M d N r (00400* Cl) 46 ^r oN A m)N0r* 6o4.-O6 Nd N .6666 2 M W M m N N m n m N^ O N m N m m M ONO. W Nem r O M.m r W N r M O m 2 m M 00VMNr WOVMNNNm^TVVVVVVVVVV ANNMq 100(0 W0) 00. 4N0Me0NN 0MN ^0001 WMNN0 NN^ 4rO0f 00 J N :md^ '. A 0 m N.^^ 0 m.M N m O M m W 0*m m 0 *m m 0 r N O m 0 2 W M m W N00,00 O m A 0 m ,,mo .A m o mOmm^ VOA02 AMMO mM,WN MmmNd a^N2 V WM O r oAWmQ WN d W A0NN mWW 0.0-, ^r hmMDm 605,:66 ONOO NNO)A^ ODaDO0mV 004 m^.0 .^WN2 OWNW Nm.NW mNWmM 0rMN0 ,.MOW mY^mA .NOW. NM^OW WNMNmrN 000 MMMMMMMMVV VVV VY WMMOA .0.. .40,00WWm m .WWrAAAAAnrnrrmWmU Md QO QQQVVV.N WmWWWW0 O W 9 U, W Q^.m NmA^ 00101V, MW N m M maMW WMNWn Om^mN O 2 m r M O m^ M M W O m r r m W W d M m d 4 _ rr mOd ^ 2M WN.0N N m N.m N(O m N Y m Nmm N m O M m Q M(GmMm M(OmM (OOMrO V,AGM G V 1A� V 4A�V r O V IA•-d r�VA^ V IA^V r V r^V r�V r� V c.5 4 m W MO.a Q M m W W W A r W N W V. M N^ .m W A A m..M M M N^ m m W A r m N N M M M N^^O m m W A r O N N M I�2 ^NM r N W r 2 O�-N d m W r O^N N MAN W r 2 m O^ N M d m m 40,000 ^N M'm W'W m O O^N(M d W r W N W m W,r r r r r r r r r W W W W W W W W W Wmm m m mmm m m m m O O 00000 0 0 0 0^ ^ ^ N N N N N N N N N N V 0) N T V w„040 N O d N M W N N^^ A^W W W MMM,, 1,-COMP-00 N m A^M M W O m 0 C,9-000, m m N N W m.m N. m.W A A O Nmm A m M m r m W N. m m M ^M m W W 1�W N m M.W m^.W N W m M m O A W W 0 2 N d r OMA O M n O N e N e 2 0 d m W AA 0 MN .O.VM W NAA 0 M M W 4A0 40 r.V r Mvr00 MM W,O 4r.:64,-:. MN AO d r-:64,.:6 n CMr OM W m 3 (md0 W N WMO O MM.,, W,W M M M N^^O m W W A A m m m Y M N^^O m m W r r m N m A M N^^o m m W r r ( M O A N M N^O NW m 0^ A m W r W m 0 N M M M M M M M 0^N M A M WAW m m 0^N M ..N A W .O^N M M d m W A W W O^N M M(O m 0 ^ ^^^NN N AN N N N N N N N M M M d d Q Q d d A d A d d mmm N N..m N mmm W W W W W W W W r r r r r r r ((pp f N(2MNA NOMNA MN (W0021 O MAN.M O^M W MO NANM m Om,MV OCMD M O^MINO W m ..W A m O MOON Imn.A AOW N V ACADn W NMN F 46 Nm W d MV OM Nm W O NN m CGAY YY N 0101 MAd AAdAd dMMMM MMMMM MMMMM MCMAAAN ...W. NdAMd MMMMM MMMMM MMM^ Q d (0*A d A A A d A A AAAA A d A d A d d A d A e d d A d d d A d a d A d d d A MMMM A (0*A M A *0 d M d (0*d d a d M d M MEM. d m... N O M W Q W M N W W^ V N M^^ O M M W m N M N^^ m MMM O m N^N r r m A W N W e O N 0^e^m M Y M n N m O M O ^ mNNMA Nr07 WWM NOmO^ MWMdO 00^m0 NMmr0 mWmWW NNN^m MmNmW mMm0 O* m,IMN.- OOOiWn MNmuYl OmCODO00,6. 4mmrmmmr00000000000000000000000000000000000000MAm0 mmrrn 00 00 00 00 000 00000 00000 00000 0000 AQ adad d d d a a d a d A d M d 0 d d A d a d A d a d d y (0*d e d MMMM M (0*A M M (0*M M M (0*M M M (0*M M M MMM M • 2W m mOmMAnMWmm rOdWW 0mrrn NWm^r MM200 A W W W N W m M m O.A A m M.N. W Wrr WWM.,- 2-.. A p O rmrdCD ^0^N N .Nm .r.A. m v f 2. 60606 dNMNd QAOI W 6.-0;66 666.6 4644. QY 664 MN NCDn IAN m,0 W YM YM N a MNM (O W ACG Oi COm n NE NN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N e ^C nnNO 0 M 00-00 W V 2 Qm^m N A m N M 0 0^0 N A ^W^M e ,,MAA m^0 A M W m A O M d N r N^ YN N N^ ,WOO ^ 0A-WWW. OW.0A NWM OMD( W.^OW 000. ^ CAWm 000WW ) .00 W00MW mWMOM MWAMm m04- .Wrr 66 66 00^0o O0000 mormm Wmoom mAAWW WOomm oo^mo o^ o m000 mmmmm ooo mW mm mmmm mmmmm 26262 22662 26622 66626 m ^mm mmm.-m mmW22 mmmm O 0A. N N N O N O A d A. W N W N A^m e O O W M A m.^ N^O N W *MO*, W N N Y^ 'N M M O M Y m N N O OWN N W^O m M A^m O V 2 N m O MAO m m M r O M ,N W O A 2 N m r 0 d W N m m M r^.2 d 2 N m m M W m N A O N r 0 M r^A Nm OiMmO M W O MrO dr Odn ^Ar^d r^4o5.. 4.^hCG co^NCO^ 6CONh2 NNCO NH CO Nw7 CO N N m Nhm Nh m N m.. M M M N^ ^O m m W r r m.N M M M N^ ^001(7,0 A r W.. M M M N^ ^O m m W A n W.N A M M N^ ^O m m W W 0 0 0 0 0 ,O 0 r woo•-N N d e.W n W 010,- .M^N m A W m m 0 NM d N W A CO MO N N M Y N W n W m O^N M Y W W n 00 0.000 000)00 0101 0 0 0 00000 00 0^^ ^ ^ AAA-AN ((401040)04 000)00000) 0)0,0,0)0) MM... A Add M V M M M N 0 00 N O_ 8 E � o c 0 0 v 0 oID v OO <WW «ADPMNgPA NA'4p M�a Wnnm0 ppaNMe P_N8P NON WO Cpmn R hNmPM_AN.200M2v0VO 6NO0{.4 OP a Jy NHhNN hN NMoOo022nPqP�PP VWW q NMMMM8MhhN MMMMM NNNMM n... .. 0 00000 00000 00000 AI`000 00000 0010 a O WW 8 p (p� �p m 8 p O N NIS 0N �DmNm< m_NAQ2 0N01OtP1 01-NO53 tDPY N Y � AMR�P BMPeO p �p C h IhINDQM NNN.omo WELT. P.I �Q MANN72 000 N J m .000. HHRH] l•1N NNN NNNNN NN NNN CO HW m m m m W W W W W W W W W W W W W W 0.0... W W W • 66666 V V MVf 66666 V V V V O O O tO 666 V VVV VV<VV CWA hmoVO VbpN byamPt322 i;SWN WW< 1%,,. AHa4Npi .- baTbWNOVhMOO0O W g g0000 00008Wp.0.0000_eee0AnWW N ZAVEH 2222§ NNVOA 22222 22122E E214 C m m{DOPA aPA aS 2'48n IDQ tela GEONmIW'1 NN V L pOi MfLeO1N �'E�pj.t f O ff Oi V§ AmMEl �FITWA W4 aD m N�0b N ha eH HN__ OPPmtO Wpp• 22222 pp pp IA mom.. 8008 00000 m2222 22.62222 22222 $e2D2`d 22222 23235 32222 222 T, .,^ _M2208 m_M_IRn mM0A eneA$ r-2222 2W0 O -0 0. _,-. o_ o .. M.6660oo 00v6 0000 _oio J - .., 1":1-'3 • 1 NVl9,/N(IWjN m' gaaaaaa Q;✓CO ,- WW W WWWW NRGS oP17,mma vMNvV SE.NhP M2P23 <73:28 2 *4-v 1 6.6 %NNN.74.7474 M ONMN O ^mg4NW NW3We0 286-ma magam Raga 6ma 8 00a m -mon ! _ aNN000 %(55% J to i n ro.:2mA3 48_AP W �N AASB Mm:;S PaVEW♦♦P a« )71-tin w 88O0hPNPNW:TOhH6W taa PW0POO ID22 .POOpPon ...2N J pE.i . OONNNNN N. N n nE0p r...VQ. P P11§1-1'c2 W '.7,..7, co H tp 0 p ppp0Ip h Nr`u� ID t`�tBVMm o`h°maa m�eN3 v5��� nIND_�cna moo o WIg sZs.j N., \:.\ Lll N. nH 6604 664eV ..... 6W C 1 1 1 I� O A M N_ 0.1...00 N_pp N 0. M 1 tY� N 8n Of R Ntp W POO W N O 1OD IH- W m W W o m� •YY. hi O ✓ tD COMM.. 000S01-01 O,P O,PW G+PPOO oOO O W yNNAN� `., 0 m Nn y O" N p D n WNomPpO08O M2Roo2 Wp1VE, M; y IOW NN3MIn Lae 8 a q O 4 71M-6::O W N Im emIpp A p mr7 D lV IH'1 M 4 e e G D 45;-.0 D f A(0y b f O.Ap E '6666.0 C.s��w W 4p �- .A J a • 2A2AA AA Nfh Reeee a V1 IA Y{ gMIO O C 000 l=i G ` 0 G q �Wp • o p I£ ,a k� y2j,Cf NIDO7a IH-avUMf< ONOHO ONhCI' OIPDG:OIRPf h�Om M c:OSSNUOIIOO Tt { �I 9 W ePHW P N W OWN W 6m.6CI .60.6 M.6..,4 O h .._00401,AA O b e N N W W 6 PAm�S� �m�m m�$$� om0P� m S oso i .-.-•-•- :: c y 0 , / 4V 44 g «45 "$TTii .m z p MPM.-N MPN Hp O OMR W 2 Sapp ppi�p gI�WW O Y�Q y r� . E = S p • �` -S N OOmm 24i t 2 mSmO:N NmPe r. PM0:3 *!,>g ....... [ l0 0 p a0 V U • C9 yy �y O�(V ro a vi Ip vi mm�Ipp ni A a'i {1041 aG $i $ri r, LL W W N W W W W MtR t'':HN Heve a e a a nIl'f NN 00 t �p rl m O a eeeee vevee ave a eeeve eeeev vee p ««aaa 00 a 8U s tr W To w % 0 g 1 M.- d ' Qf :log a Y IM� CCpp a pp p pp LL �+ r N O U N ` N O 6.11,-66 NIDIhDPA6 r36.,-no a.m.. WmOOOP m00 00i C OIFS3m0 S H SOJ WAAPO) 00800 OOOOO 00000 OOO 000 r ti'Ot0O!IOOty O 00000 00 OO80M . N f ~•OCP'fgg2e9 0 S Ahp^! . o :soon t W R22 » .4 ..Qp ^0000 4NOOOO 22?V 2m22$ MPMDO MPP V J”af-828 ,_ 8 6W4H ...04 NNNRe N"e<IN )h ,.?.!,q66000 zzNNNNN NNNN N0N NN NNNN NN pI OP0O E „6 n NF. ('- 0 W_N m I m J b n N W W O C e'NeG) Pnhpp 8MmN2 ANODN MppPNePammm A m mPmOm mmmm romS ;04:002 S0a.- psSK LL EO 6 LL J q N M LL LL a 3 $MQ m �p p �p Ip O p N t e m' U f T.: S.17,20a IA.NNW pApp 8800 W u',SRV W tea m0{Wy V:33y• Cryp8 q(6 Z 2 f;• ', NU N .7,22 AN 048§.8a {RDIDaa, P.-k AAf- p F m O %Q 1, . 1 E f .1 Ni i a Y w P o 0 O C W 6 T T E tt U as 0 r RECEIVED STATE OF ALASKA MAY 2 6 2015 ALAS OIL AND GAS CONSERVATION COMM10010N WELL COMPLETION OR RECOMPLETION REPORT AND1106ICC la.Well Status: Oil E Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑ 1b.Well Class: 20AAC 25105 20AAC 25.110 Development ' Exploratory ❑ GINJ ❑ WINJ ❑ WAGE WDSPL ❑ No. of Completions: Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number/ Sundry: ENI US Operating Co. Inc. Aband.: •5/15/2015 215-049 3.Address: 7. DDte,Spudded: tits'` J ' 15.API Number: 3800 Centerpoint Drive, Ste. 300,Anchorage,AK 99503 4/30/2015 50-629-23537-60-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16.Well Name and Number: Surface: 4484.5 FSL 1194.2 FEL S19 T14N R9E UM •5/6/2015 SP04-SE5 L1 • Top of Productive Interval: 9. KB(ft above MSL): 53.6 17. Field/Pool(s): 1815 FSL 4099 FEL 17 T14N R9EUM GL(ft above MSL): 13.08 Nikaitchuq/Schrader Bluff Oil Pool Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 1243 FSL 1535 FEL 21 T14N R9EUM N/A ADL 0391283, 0388583, 0388582 • 4b. Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19. Land Use Permit: Surface: x- 511715.38 y- 6053666.44 Zone- 4 '17,420'MD/4,106'TVD • ADL 417493 TPI: x- 514076.16 y- 6056281.19 Zone- 4 12. SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 521950.43 y- 6050448.49 Zone- 4 N/A 1,987'MD/1,779'TVD 5. Directional or Inclination Survey: Yes . C (attached) No ❑ 13.Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 13.1 (ft MSL) .NIA- g9OH 1/yb&l/I ,-- . 1-,. 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment,whichever occurs first.Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance,dipmeter,formation tester,temperature, cement evaluation, casing collar locator,jewelry, and perforation record. Acronyms may be used.Attach a separate page if necessary GR/RES/NEU/DEN 23. CASING, LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD FT PULLED 20 178.89 X-65 36.85 160 36.85 160 Driven N/A N/A 13.375 68 L-80 36.85 3274 36.85 2486 16 10.7 ppg :485 bbls N/A 12.5 ppg :67.9 bbls 9.625 40 L-80 35.53 7598 35.53 4095 12.25 12.5 ppg : 170.9 bbls N/A 45._, �J 15.8 ppg : 53.9 bbls 11 5.5 15.5 L-80 7 13.48--8' ,....7.44•6-- 17395 ,....7.44•6- • 4132 8.75 Slotted Liner I"- `y. N/A . I ' , /cit.( 24. Open to production or injection? Yes ❑ No ❑ 25.TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): •,L 4.5 6,276 N/A Slotted Liner ! >. 71/ L/ .'I7 y 2U wt V 26.ACID, FRACTURE, CEMENT SQUEEZE, ETC. f Was hydraulic fracturing used during completion? Yes❑ No ❑ : : Per 20 AAC 25.283(1)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): 5/25/2015 ESP Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: 5/24/2015 24h Test Period -- 970.0 0.0 32.0 32/64 0 Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 285 0 psi 24-Hour Rate -4 970.0 0.0 32.0 17.5 Form 10-407 IIev se�d 5/201� " CQNTI UEf ON PA E 2 , Submit ORIGINIAL only --f1,'`1,141) -71 '--` 1• I /l S ,'/ fr9-ReDMS MAY 2 7 2015 28. CORE DATA Conventional Cor. Yes ❑ No ❑ Sidewall Cores: ❑ No ❑ If Yes, list formations and intervals cored(MD/TVD, From/To), and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed). Submit detailed descriptions,core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No Permafrost-Top surf surf If yes, list intervals and formations tested, briefly summarizing test results. Permafrost-Base 1987 1779 Attach separate pages to this form, if needed,and submit detailed test information, including reports, per 20 AAC 25.071. Top Ugnu 2783 2278 Top Lower Ugnu 5219 3555 Top Schrader Bluff 5882 3857 Top N sand 6134 3938 Top OA Sand 7840 4106 Formation at total depth: OA Sand 17420 4106 31. List of Attachments: Directional Survey,As Run Wellbore Schematic,Well Operations Summary, Cementing Report Information to be attached includes, but is not limited to: summary of daily operations,wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Giuseppe Maugeri Email: giuseppe.maugeri@enipetroleum.com Printed Name: Marc Kuck Title: Drilling&Completion Engineering Manager Signature: /A, Phone: (907)865-3328 Date: 5/26/2015 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection, Salt Water Disposal,Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions,core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form:well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only p p c ci � �- c c � L OO o :o o c \ G o) /CO a /, U , I- hO > O C p O — D I � N � cw W ,n 1— z _, t 0 cn °- o�/-� Qo � � o _ s. � M v/ N w E 43 ON (75 O o I a Q_ • V 20 2 Ci) � m Ni I . mLrna).. J Cl) N- co_ Q N- m L 5 � vkl E > 0co I as I > co Q U — el I o _ I = L ,- H co Q. C_ co } r ' I I L^ll 4- W o a) I _ L I Q J N U � n p oY Lo -O co U lC) a) N N X a) rn .gET) � ao I � m I min N _a) 12) J J i c6 U O a) Q v CD- C I z I (D - + L o a) o ° CO ▪ o) O _ It oo \ N o 0_ a) I 3 Q p J n N 0 15 p cn 3 2 a) p > 0 cn �` L I O • a) D O �n wc 4t in 0) 0 w > c i E °" m : p > c r a) � Oo v L- coY N o � � � � � � _ I Q � C.) C O ca O C7 > > o ,co O OH as fC l' I— U ca N (Y) M U) = co C r U co cfl 0_ a�Ne o o MCO 2 C _1 � J ,f . 41" \ � � c\i X a) - c , a N o co • ° E 0o O a) ° in m p E gi � 00O NQ � � � �� N •a) etM � . � O to O O - co .( O N Q) CO Q) N N U Q co Cn co O (n w � / f— L O C Ili coJ Y m O ca : X0- S Ao 2 if) 2? 0- ',5 \ CL > _ N C l,n _ : co � L ` I La-) O O - r cc _�11=111ihA': ' J Cu N M N n co ,--li #r b u co X as 2 O 1� Q (I ______ MIII1‘ ,411,1110)4t i - a y'al Ti Njt 4c7 arty C co F>— C in m cao v v 0 U = - _ 0o coo a`ni t_ Q_ n_ CL 0 U) ,- M N 2 a7 7 (% an 2 Eni E&P Division .. Wetl Name: 4E5 L1 OR I ENlPetroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUQ • 2^II Date:4/25/2015 - Report#: 1 APIIUWI:50-629-23537430-00 II II n page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) 5PO4-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3.047.70 68.94 44.2 -4.52 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 0.00 106.0 -13.9 Overcast,Fog WC- SSW @ 5 MPH 3' Daily summary operation 24h Summary L/D Liner Hanger running Assy and MWD as per Baker and Schlumberger MWD onsite.Clear rig floor of all Baker running tools and Equip.Bring Baker Whipstock tools and Equip to rig floor.PJSM W/all ✓ essential personnel for Whipstock.P/U M/U Whipstock and milling Assy as per Baker Rep onsite.RIH Whipstock Assy.on 5"D.P.F/154'to 1,555'MD.HST 120K,SLK 116K.Perform shallow hole test as per Schlumberger MWD 350 GPM,430 PSI.Good.RIH Whipstock Assy.on 5"D.P.F/1,555'to 6,690'MD.HST 179K,SLK 142K.No losses. Operation at 07.00 Mill window in 9 5/8"Csg @ 7,467'MD. 24h Forecast Cont.to RIH W/Whipstock on 5"D.P.F/6,690'to 7,442'MD.Orientate and shear Whipstock.Mill Window and POOH.UD running Assy.and test BOPE Lithology Shows MAASP(kgf/cm') Mud Weight(g/L) 1126.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 12:00 12:30 0.50 0.50 DRILL G 20 P PJSM L/D Liner Hanger running Assy and MWD as per Baker and Schlumberger MWD onsite. 12:30 14:00 1.50 2.00 DRILL E 20 P PJSA Clear rig floor of all Baker running tools and Equip.Bring Baker Whipstock tools and Equip to rig floor. 14:00 17:30 3.50 5.50 DRILL E 14 P PJSM W/all essential personnel for Whipstock.P/U M/U Whipstock and milling Assy as per Baker Rep onsite. 17:30 18:30 1.00 6.50 DRILL E 4 P PJSA RIH Whipstock Assy.on 5"D.P.F/154'to 1,555'MD.HST 120K,SLK 118K. 18:30 19:00 0.50 7.00 DRILL E 12 P PJSA Perform shallow hole test as per Schlumberger MWD 350 GPM,430 PSI.Good. 19:00 00:00 5.00 12.00 DRILL E 4 P PJSA RIH Whipstock Assy.on 5"D.P.F/1,555'to 6,690'MD.HST 179K,SLK 142K.No losses. Daily Contacts Position Contact Name Company Title E-mail Office _ Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-6685-0715 715-6434 Erg representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Bernie Leas ENI Rig Clerk akrigderksdoyon15@enipetroleum.com 907-685-0722 907-268-9054 Eni representative Troy England ENI HSE Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Tool Push Dave Evans Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Dolling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) _ Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type •Fluid Density(g/L) P Surf Applied(kgf/cm') Eq.Mud Weight(g/L) P LeakOff(kgf/cm') Eni E&P Division �, Well Name: 3E5 Li OR l ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name: NIKAITCHUQ • API/UWI:50-629-23537-60-00 2^ tt Date:4/26/2015 - Report#: 2 II II II page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4.077.31 1.245.98 3.047.70 68.94 44.2 -3.52 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 0.00 105.0 -13.9 Overcast,Fog WC- NW @ 5 MPH 3' Daily summary operation 24h Summary Cont.RIH W/Whipstock on 5"D.P.F/6,690'MD to 7,437'MD.Kelly up on stand 79 and fill drill string.HST 180K,SLK 140K Orientate MLHR Anchor as per Schlumberger MWD and Baker Rep onsite. Verified by Co Rep onsite.Slack off 10K and verify orientation W/MWD tool face.Pull to verify latched @ 190K,10K over pull.Confirmed latch was set.Attempted to shear Whipstock bolt W/50-60K down weight,unsuccessful.Put 15K torque in string to shear bolt W/no success.Pull 205K(15K over pull)Notice release from Whipstock.Press.up to 500 PSI and Press.bled off,verify free from latch. Called and informed town of the issues.Decision was made to set anchor again.Attempted re-orientate Whipstock.Slack off W/10K(130K)W/no change on MWD tool face.Press.up to 500 PSI W/ bleed off.Picked up to neutral and rotated.Broke over at 12K TRQ to 8K TRQ rotating freely.Decision was made to POOH.Monitor well,static.POOH W/Milling Assy.on 5"D.P.F/7,405'to 97'MD.UD Milling BHA W/out Whipstock as per Baker Hughes and Schlumberger MWD Rep onsite.P/U M/U Retrieval Hook BHA and orientate MWD as per Schlumberger MWD and Baker Rep onsite.Verified by Co Rep onsite.to 95'MD.RIH Retrieval Hook BHA on 5"D.P.Fl 95'to 7,378'MD.HST 134K,SLK 126K.Filling every 20 stands.Shallow hole test MWD as per Schlumberger MWD @ 1,585'MD,good. 315 GPM,900 PSI.Orientate Hook W/MWD tool.Wash down F/7,378'MD 320 GPM,1,150 PSI,tag top of Whipstock @ 7,406'MD.After several attempts to latch on to Whipstock,latched @ 7,411'MD and pulled free W/60K over string weight.(240K)Monitor well,static.POOH F/7,411'to 7,191'MD HST 180K,SLK 140K.Baker Hughes Rep observed no indication of extra drag or swabbing due to Whipstock Assy.Decision was made to RIH F/7,191'to 7,378'MD.Orientate Hook and wash down F/3,378'320 GPM,1,150 PSI to 7,403'MD,3'higher than before.Make 3 attempts to latch onto Whipstock.Decision was made to POOH.No Whipstock was seen. Operation at 07.00 Test BOPE. 24h Forecast R/U and Test BOPE,witness waived by AOGCC.P/U M/U Bent Hook Retrieval BHA.RIH and fish Whipstock. Lithology Shows MAASP(kgf/cm') Mud Weight(gIL) 1126.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 00:30 0.50 0.50 DRILL E 4 P PJSM Cont.RIH W/Whipstock on 5"D.P.F/6,690'MD to 7,437'MD.HST 180K,SLK 140K. SPR @ 7,433'MD(4,083'TVD)W/9.4 ppg MW MP#1 20-140,30-180 MP#2 20-140,30-180 MP#3 20-140,30-180 00:30 01:00 0.50 1.00'DRILL E 19 P PJSM Kelly up on stand 79 and fill drill string.HST 180K,SLK 140K Orientate MLHR Anchor as per Schlumberger MWD and Baker Rep onsite.Verified by Co Rep onsite.Slack off 10K and verify orientation W/MWD tool face.Pull to verify latched @ 190K,10K over pull.Confirmed latch was set. 01:00 02:30 1.50 2.50 DRILL E 19 P PJSA Attempted to shear Whipstock bolt W/50-60K down weight,unsuccessful.Put 15K torque in string to shear bolt Wi no success.Pull 205K(15K over pull)Notice release from Whipstock.Press.up to 500 PSI and Press.bled off,verify free from latch.Called and informed town of the issues.Decision was made to set anchor again. 02:30 04:00 ' 1.50 4.00 DRILL E 19 P PJSA Attempted re-orientate Whipstock.Slack off W/10K(130K)W/no change on MWD tool face.Press.up to 500 PSI W/bleed off.Picked up to neutral and rotated.Broke over at 12K TRQ to 8K TRO rotating freely.Decision was made to POOH.Monitor well,static. 04:00 08:00 4.00 8.00'DRILL 'E 4 'U PJSA POOH W/Milling Assy.on 5"D.P.F/7,405'to 97'MD. 08:00 08:30 0.50 8.50 DRILL E 20 U PJSM UD Milling BHA W/out Whipstock as per Baker Hughes and Schlumberger MWD Rep onsite. 08:30 09:30 ' 1.00 9.50'DRILL 'E 20 U PJSAP/U M/U Retrieval Hook BHA and orientate MWD as per Schlumberger MWD and Baker Rep onsite.Verified by Co Rep onsite.to 95'MD. 09:30 14:30 ' 5.00 14.50'DRILL 'E 4 U PJSA RIH Retrieval Hook BHA on 5"D.P.F/95'to 7,378'MD.HST 180K,SLK 140K.Filling every 20 stands.Shallow hole test MWD as per Schlumberger MWD @ 1,585'MD,good.315 GPM,900 PSI. 14:30 "17:00 ' 2.50 17.00 DRILL E 19 U PJSA Orientate Hook W/MWD tool.Wash down F/7,378'MD 320 GPM,1,150 PSI,tag top of Whipstock @ 7,406'MD. After several attempts to latch on to Whipstock,latched @ 7,411'MD and pulled free W/60K over string weight.(240K) Monitor well,static. 17:00 "17:30 - 0.50 17.50'DRILL 'E 4 U PJSA POOH F/7,411'to 7,191'MD HST 180K,SLK 140K.Baker Hughes Rep observed no indication of extra drag or swabbing due to Whipstock Assy. 17:30 18:00 0.50 18.00 DRILL E 4 U 'PJSA Decision was made to RIH F/7,191'to 7,378'MD.HST 180K,SLK 140K. 18:00 18:30 0.50 18.50'DRILL 'E 19 U PJSA Orientate Hook and wash down F/3,378'320 GPM,1,150 PSI to 7,403'MD,3'higher than before.Make 3 attempts ,to latch on to Whipstock.Decision was made to POOH.Monitor well,static. 18:30 22:30 4.00 22.50'DRILL E 4 U t PJSM POOH W/5"D.P.F/7,403'to 95'MD. 22:30 00:00 1.50 24.00 DRILL E 20 U IPJSM W/all essential personnel.UD Whipstock retrieval BHA F/93'MD.No Whipstock.Lost 12 bbl for tour. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener a ENI Senior Drilling Supv SIDDrilling@enipetroleum.com '907-685-0715 '715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Bernie Leas ENI Rig Clerk akngderksdoyon15@enipetroleum.com 907-685-0722 907-268-9054 Eni representative Troy England ENI HSE Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVG(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgf/cm') Eq.Mud Weight(gIL) P LeakOff(kgflcm') Eni E&P Division Q Well Name. oE5 L1 OR ENI Petroleum Co.Inc. Daily Report Wellcode:27983 Field Name:NIKAITCHUO • 2 II n nIII* Date:4/27/2015 - Report#: 3 APIIUWI:50-629-23537-60-00 II II page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1.245.98 3,047 70 68.94 44.2 2._2 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 0.00 104.0 -94 Overcast WC-F3- NW @ 10 MPH Daily summary operation 24h Summary Break down MWD,Float Sub and X/O.UD in Pipe Shed.Clean and clear rig floor.R/U and perform stack washing W/Vetco Grey Rep onsite.Blow down TDS-8.Drain stack and pull Wear Bushing and set test plug as per Vetco Grey Rep onsite.Fill stack and Choke Manifold W.H2O.R/U test Equip.for BOPE test Perform BOPE test.AOGCC witness waived by Bob Noble 4/26/15 by phone.R/D and Blow down test Equip.Service Upper and Lower IBOP.Pull test plug and set Wear Bushing as per Vetco Grey Rep onsite.P/U WU Retrieval BHA,orientate Hook as per Baker,Schlumberger MWD and Co Reps onsite.TFA.442.No losses for tour.RIH W/Retrieval BHA on 5"D.P.to 7,379'MD.HST 181 K,SLK 145K.Shallow hole test MWD @ 1,492'MD 320 GPM,1,100 PSI.Fill D.P.every 20 stands. Obtain SPR.Odentate hook,Wash down F/7,379'to 7,411'MD 320 GPM,1,100 PSI.Tag top of Whipstock @ 7,406'MD.Make several attempts to latch Whipstock onto hook @ 7,411'MD W/210K hook load and set down 20K over SLK Wt.,Hook is not staying-set at 210K hook load. Discuss further operations with all parties involved on fishing Whipstock. Cont.to attempt to latch onto Whipstock W/Bent Hook Assy.W/210K hook load and 20K SLK.Still unable to keep Whipstock hook in key way of Whipstock W/210K hook load.Pump rates 320-460 GPM,1,100-1,960 PSI. Operation at 07.00 POOH W/Bent Hook BHA. 24h Forecast Cont trying to pull Whipstock.POOH and C/O BHA for over shot BHA.RIH and pull Whipstock.POOH and UD Whipstock. Uthology Shows MAASP(kgflcm') Mud Weight(g/L) 1126.4 Time Log I Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 00:30 0.50 0.50 DRILL E 20 U PJSA Break down MWD,Float Sub and X/0.L/D in Pipe Shed. 00:30 01:00 0.50 1.00 DRILL E 20 U 'PJSA Clean and clear rig floor. 01:00 02:00 1.00 2.00 DRILL C 1 P PJSA R/U and perform stack washing W/Vetco Grey Rep onsite.Blow down TDS-8. 02:00 02:30 0.50 2.50 DRILL C 5 P PJSA Drain stack and pull Wear Bushing and set test plug as per Vetco Grey Rep onsite. 02:30 03:00 0.50 3.00 DRILL C 1 P PJSA Fill stack and Choke Manifold W.H2O.R/U test Equip.for BOPE test. 03:00 08:30 5.50 8.50 DRILL C 12 P PJSM Perform BOPE test:Annular Preventer 250 PSI low and 2,500 PSI high.Blind Rams,Choke valves 1-14,Upper and Lower Rams,Dart Valve,FOSV,Manual Choke and Kill,GCR Choke and Kill,Upper and Lower IBOP with 4.5"and 5"test joint to 250 PSI low and 3,500 PSI high.Test Manual Choke A&B and Super Choke to 1,500 PSI.All charted.Perform Koomey draw down:Start Press.Manifold 1,400 PSI,System Press.3,000 PSI,Annular Press.600 PSI.After function: Manifold Press.1,400 PSI,System Press.1,400 PSI,System Press.600 PSI,200 PSI increase in 34 Sec.Full system charge 177 Sec.Nitrogen 5 bottle average 2,375 PSI.AOGCC witness waived by Bob Noble 4/26/15 by phone.Gas alarms tested and calibrated. 08:30 09:30 1.00 9.50 DRILL C 1 P PJSA R/D and Blow down test Equip.Service Upper and Lower IBOP. 09:30 10:00 0.50 10.00 DRILL C 5 P PJSA Pull test plug and set Wear Bushing as per Vetco Grey Rep onsite. "10:00 12:00 2.00 12.00 DRILL E 20 U PJSM P/U M/U Retrieval BHA,orientate Hook as per Baker,Schlumberger MWD and Co Reps onsite.TFA.442.No losses for tour. 12:00 16:00 4.00 16.00 DRILL E 4 U PJSM RIH W/Retrieval BHA on 5"D.P.to 7,379'MD.HST 181K,SLK 145K.Shallow hole test MWD @ 1,492'MD 320 GPM,1,100 PSI.Fill D.P.every 20 stands. 16:00 19:00 3.00 19.00 DRILL E 1 5 U PJSA Obtain SPR.Orientate hook,Wash down F/7,379'to 7,411'MD 320 GPM,1,100 PSI.Tag top of Whipstock @ 7,406'MD.Make several attempts to latch Whipstock onto hook @ 7,411'MD W/210K hook load and set down 20K over SLK Wt,Hook is not staying set at 210K hook load. SPR @ 7,379'MD(4,079'TVD)W/9.4 ppg MW MP#1 20-200,30-280 MP#2 20-200,30-280 MP#3 20-200,30-280 19:00 20:30 1.50 20.50 DRILL E 21 -U Discuss further operations with all parties involved on fishing Whipstock. 20:30 00:00 3.50 24.00 DRILL E 19 U 'PJSA Cont.to attempt to latch onto Whipstock W/Bent Hook Assy.W/210K hook load and 20K SLK.Still unable to keep Whipstocked hook in key way of Whipstock W/210K hook load.Pump rates 320-460 GPM,1,100-1,960 PSI. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener ENI Senior Dulling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Bernie Leas ENI Rig Clerk akdgclerksdoyon15@enipetroleum.com 907-685-0722 907-268-9054 Eni representative Troy England ENI HSE Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Tool Push Dave Evans Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher ng15@doyondnlling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgf/cm') Eq.Mud Weight(gIL) P LeakOff(kgf/cm') J� Eni E&P Division Well Name: ES L1 OR JJ • EN/Petroleum Co.Inc. Daily Report Well Code:27963 Field Name: NIKAITCHUQ • 2^II n Date:4/28/2015 - Report#: 4 APIIUWI 50-629-23537-60-00 II II page 1 of 1 Wellbore name: SP04-SE5 1.1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(FI.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 -Rig-Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 -1.52 Daily Information End Depth(rnKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 0.00 108.0 -9.4 Overcast WC+2' NE @ 10 MPH Daily summary operation 24h Summary Attempt to latch up on whip stock assy.POOH and L/D retrieval and whip stock assemblies.Slip and cut drill line and service rig.P/U and M/U Baker clean out assy.and RIH to 5758'. Operation at 07.00 POOH w/clean out BHA. 24h Forecast Cont.to RIH to top of liner @ 7449'and circulate and rotate cleaning out liner to 7469'.Pumps sweeps as needed and circulate casing clean.POOH and UD clean out assy.Prepare and P/U&M/U whip stock assy.and RIH and set. Lithology Shows MAASP(kgf/cm') Mud Weight(gIL) 1126.4 Time Log Start End ' Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 04:00 4.00 4.00 DRILL E 19 U PJSA Attempt to latch onto whipstock @ 7405'w/retrieval hook latch @ 7411',180-200k puw,120-140k sow,315-320 gpm,990-1010 psi. 04:00 13:00 9.00 13.00 DRILL E 4 U PJSA Monitor well and POOH with whipstock retieval tool assy.10 bbls Tourly fluid losses. 13:00 15:00 2.00 15.00 DRILL E 4 U PJSA Monitor well,UD retrieval hook and whip stock assy.as per Baker.Whipstock was in good condition other then the key slot had a few scuff marks from retrieval hook.ML ZXP seal unit had metal debris and chunks of metal imbedded on seals which caused seal unit test failure.This is indication that there are alot of metal debris in hole. 15:00 16:00 ' 1.00 16.00 DRILL E 20 U PJSA Clear and clean ng floor. 16:00 18:00 2.00 18.00 DRILL E 25 U PJSA Cut and slip 78'drilling line,inspect and adjust brakes,and inspect saver sub. 18:00 19:00 1.00 19.00 DRILL E 25 U PJSA Service and inspect top-drive,draw works and crown. 19:00 19:30 0.50 19.50 DRILL E 20 U PJSA Bring Baker clean out tools and equipment to rig floor. 19:30 21:00 1.50 21.00 DRILL E 4 U PJSA M/U Baker Clean Out BHA,Jetted Bull Nose,String Magnet,Double Pin X-over,Boot Basket,Boot Basket,Bit Sub. Grabitz String Magnet,Bowen Bumper Sub,Bowen Jars,Float Sub,Pump Out Sub,X-over to"TT525 DP,Length 62.58' 21:00 00:00 ' 3.00 24.00 DRILL E 4 U PJSA RIH w/clean out BHA on 5"DP f/62'-5758',161k puw,139k sow Fill pipe as needed.4 bbls Tourly fluid losses. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Bernie Leas ENI Rig Clerk akrigclerksdoyonl5@enipetroleum.com 907-685-0722 907-268-9054 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgf/cm') Eq.Mud Weight(gIL) P LeakOff(kgf/cm') cif* Eni E&P Division IWell Name: ES L1 OR ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUO eDate:4/29/2015 - Report#: 5 APIIUVN:50.629-23537-60-00 e" " page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(Fit ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) _ -- 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 442 -052 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 0.00 107.0 -8.8 Overcast WC 3 N @ 11 MPH Daily summary operation 24h Summary RIH wl clean out assy.to 7469'and CBU X 3 w/Hi-Vis sweeps to clean up well.POOH and dean up magnets and boot baskets w/excessive debris.RIH#2 and reclean well.POOH cal small amout of debris.Clean&work rams circulating clean.M/U Baker milling assy.and rack in derrick. Operation at 07.00 RIH w/whip stock/milling assy.in hole with 1 stand of pipe. 24h Forecast P/U,M/U and RIH w/12 jts of 5"HWDP and POOH rack in derrick.M/U whip stock assy.and bolt to milling assy.RIH slowly and perform SHT.Cont.in hole and orient string and latch into liner.Shear 48k brass bolt and mill window as per Baker. Lithology Shows MAASP(kgflcmr) Mud Weight(gIL) 11264 Time Log Start End Cum Time Time Dur(hr) Our(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 01:00 1.00 1.00 DRILL E 4 U PJSA RIH w/clean out assy.(/5758'-7469',180k puw,143k sow. 01:00 03:00 2.00 3.00 DRILL E 7 U PJSA Set parameters @ 180k puw,143k sow,160k rotw,4-5k tq,10-20 rpm,650 gpm,3350 psi.Work 20'into liner @ 7469'and circulate and pump Hi-Vis sweep.Circulate and work pipe and pump sweep#2 and work to top of liner.Circulate and work pipe for 3 total bottom ups. 03:00 09:00 6.00 9.00 DRILL E 4 U 'PJSA Monitor well,POOH WI dean out assy.f/7469'to surface. 09:00 09:30 0.50 9.50 DRILL E 20 U 'PJSA Clean magnets and check boot baskets.Excessive metal shaving came back,Magnets full of metal shavings and 6" of the same in 2 boot baskets.Town decision to make run#2 ml dean out assy.Prep BHA for RIH. 09:30 13:30 4.00 13.50 DRILL E 4 U -PJSA RIH w/clean out BHA#2,,Jetted Bull Nose.String Magnet,Double Pin X-over,Boot Basket,Boot Basket,Bit Sub. Grabitz String Magnet,Bowen Bumper Sub,Bowen Jars,Float Sub,Pump Out Sub,X-over to"TT525 DP,Length 62.58' RIH to 7466,180k puw,140k sow,fill as needed.14 bbl Toury Fluid losses. 13:30 15:00 1.50 15.00 DRILL E 7 U PJSA Circulate and pump Hi-Vis sweep and work pipe @ 560 gpm,2550 psi,20 rpm,4-5k tq,180k puw,140k sow,150k rotwwhile CBU. 15:00 18:30 3.50 18.50 DRILL E 4 U 'PJSA Monitor well and POOH f/7466'-62'. 18:30 20:00 1.50 20.00 DRILL E 4 U 'PJSA Monitor well and UD clean out assy.Clean magnets and boot baskets cal small amounts of debris. 20:00 21:00 1.00 21.00 DRILL E 20 U -PJSA Clear and clean rig floor. 21:00 22:00 1.00 22.00 DRILL E 7 U PJSA R/U stack washer w/string magnet and function rams and circulate stack dean. 22:00 22:30 0.50 22.50 DRILL E 20 U PJSA Bring up whip stock tools and equipment to rig floor. 22:30 00:00 1.50 24.00 DRILL E 20 U 'PJSA M/U Baker whip stock milling assy.and stand back in derrick. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk akngderksdoyonl5@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgflcm') Eq.Mud Weight(gIL) P LeakOff(kgflcm') tilos, Eni E&P Division I Well Name: ,E5 L1 OR I ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUO e Date:4/30/2015 - Report#: 6 APS:50-629-23537-60-00 2" " page 1 of 1 Wellbore name: SP04-SE5 Ll Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(El.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L' DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 0.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 2,271 67 1,244.85 8.84 106.0 -12.2 Overcast WC-4" NNE @ 9 MPH Daily summary operation 24h Summary P/U,M/U and rack 4 stands HWDP in derrick.M/U whip stock assy.and bolt w/48k shear bolt to milling assy.and RIH to 7350'.Orient tool string and latch into profile @ 37 degrees to the right.Shear bolt on whip stock and perform SPR's.Mill window from 7407'-7424'. Cont.milling to 7453'bringing upper mill through window.Work mill back through window with no problems.Ciculate 2-sweeps and CBU.POOH f/7453'-7100'.Recovered 154 lbs of metal. Operation at 07.00 POOH w/milling assy.@ 537'. 24h Forecast L/D 12 jts.of HWDP.POOH LID Baker milling assy.and clean and clear ng floor.P/U 8 M/U 8.75"drilling asy.and RIH,perform SHT and cont.to RIH to TO Window. Lithology Shows MAASP(kgflcm') Mud Weight(g/L) 1132.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 I 01:00 1.00 1.00 DRILL E 20 IU 'PJSA P/U and M/U 12 jts.of HWDP and stand back in derrick. 01:00 03:30 2.50' 3.50 DRILL E 4 U 'PJSA M/U Whip stock assy.and bolt to mill assy.to 164',78k puw,80k sow.A 48k shear bolt was installed. 03:30 11:00 7.50 11.00 DRILL E 4 U PJSA RIH f/164'-1561'and perform shallow hole test.Cont.to 7350',191k puw,153k sow. k//�� 1 ,/, 11:00 12:00 1.00 12.00 DRILL E 19 -U 'PJSA Orient tool string and latch whip stock in profile @ 37 degrees right. 12:00 12:30 0.50' 12.50 DRILL E 19 P PJSA Shear milling assy.from whip stock.Obtain SPR's @ 7404'MD(4085'TVD)w/9.4 ppg MW;#1,#2,#3 @ 20-160, 1�-r @ 30-210. J 12:30 22:30 10.00' 22.50 DRILL E 14 IP PJSA Mill window f/7407'-7424'as oer aRIALli _kngw,15§k sow,165k rotw,500 gpm,1520 psi,80 rpm,4-10k wob,8k WI r tq.Cont.drilling to 7453'passing the upper mill through window with the same parameters.Work mill back through window t with no abnormalities.Pumped Hi-Vis sweep then a Hi-Vis sweep with 20 lbs per bbl med nut plug.Recovered 154 lbs of metal. 14P22.30 00:00 1.50 24.00 DRILL E 4 IP PJSA POOH f/7453'-7100',190k puw,155k sow. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk akrigderksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.cam 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2.315.87 4/13/2015 Last Leakoff Test Depth)mKB) TVD(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kgf/cm2) Eq.Mud Weight(g/L) P LeakOff(kgf/cm') 2.262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 Eni E&P Division } Well Name: 2E5 Li OR EN/Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUQ • 2^ Date:511/2015 - Report#: 7 APIIUWI:50-629-23537-60-00 �I I) page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SFS L" DRI__ING 4/30/2015 ' 4,077.31 1,245.98 3,047.70 68.94 44.2 1.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 2,337.82 1.248.48 67.06 4.76 14.1 102.0 -6.7 Overcast WC 6" E @ 15 MPH Daily summary operation 24h Summary POOH and LID Baker milling assy.M/U BHA#11 and RIH to 7390'.CBU and balance mud weights to 9.45 ppg.Perform FIT to 12.94 EMW.Wash down to 7450'.Dig ahead to 7670'MD. Operation at 07.00 Dolling ahead @ 7,858'MD 24h Forecast Drill ahead as per SLB and Geologists in 8.75"LI. Lithology Shows MAASP(kgflcm°) Mud Weight(gIL) 11324 Time Log Start End Cum 1 Time Time Dar(hr) Dur(hr) Phase Opr. I Act. Plan Oper.Descr. 00:00 04:00 4.00 4.00 DRILL 'E 4 P PJSA POOH wl milling assy.f/7100'-107'. 04:00 05:00 1.00 5.00'DRILL 'E -4 P PJSA Monitor well.UD Baker milling BHA. 05:00 06:00 1.00 6.00 DRILL E 20 P PJSA Clear and clean rig floor. 06:00 07:00 1.00 7.00 DRILL E 19 P PJSA Function rams and clean stack. 07:00 07:30 0.50 7.50 DRILL E 20 P PJSA Blow down top-drive and load floor w/BHA#11. 07:30 10:00 2.50 10.00 DRILL 'E 4 P PJSA M/U BHA#11 and RIH to 368',95k puw/sow. ' 10:00 12:00 2.00 12.00 DRILL E 4 P PJSA RIH w/BHA#11 w/4.5"DP f/368'-2172',128k puw,120k sow.SHT @ 1697',350 gpm,620 psi.13 bbls Toury fluid losses. 12:00 14:30 2.50 14.50 DRILL E -4 P PJSA Cont.to RIH f/2172'-7390',170k puw,130k sow. • 14:30 16:00 1.50 16.00 DRILL E '7 P PJSA CBU X 1.5 to even mud weights to 9.45 ppg in 8 out. 16:00 16:30 0.50 16.50 DRILL E '9 P PJSA R/U and perform FIT test to 12.94 ppg @ 7390'.2.3 bbls to pressure to 740 psi.2 bbls bleed back. 16:30 17:00 0.50 17.00'DRILL 'E '20 P PJSA R/D and blow down all test lines and equipment. 17:00 17:30 0.50 17.50'DRILL ""E '4 P PJSA Wash down f/7390'-7450'@ 120 gpm,230 psi.SPR @ 7363'MD(4080'TVD)w1.45 ppg;#1/#2/#3 @ 20-200,@ 30-280. 17:30 00:00 6.50 24.00 DRILL 'E .3 P PJSA Drig.f/7450'-7670'MD(4097'TVD)@ 420 gpm,1600 psi,50 rpm,8-10k wob,9.5k tqn,8k tqf,185k puw,120k sow,150k rotw,10.32 ECD,Max Gas 21,4.76 ADT/Bit/Jars. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDdlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI • Rig Clerk akrigcerksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Dolling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2.31587 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgflcm°) Eq.Mud Weight(gIL) P LeakOff(kgf/cm') 2,262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 Eni E&P DivisionWell Name: E5 L7 OR riliel ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUQ 2 s n Date:5/2/2015 - Report#: 8 APIIUWI:50-629-23537-60-00 'I II I' page 1 of 1 Wellbore name: SPO4-SE5 1..1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours)hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 2.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(SC) Weather Wind 3,077.57 1,261.07 739.75 14.34 51.6 102.0 -6.1 Overcast WC 6` E @ 15 MPH Daily summary operation 24h Summary Drig.f/7670-10,09T MD(4138'NO). Operation at 07.00 Drilling ahead @ 10,546'MD 24h Forecast Drill ahead as per SLB and Geologists in 8.75"L1. Lithology Shows MAASP(kgf/cm') Mud Weight(gIL) 11324 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper,Donor. 00:00 06:00 6.00 6.00 DRILL E 3 P PJSA Orig.f/7670'-8044'MD(4112'TVD)@ 500 gpm,2210 psi,140 rpm,10k wob,10k tqn,8.5k tqf,205k puw,115k sow,151k rotw,10.72 ECD,Max Gas 2104,3.87 ADT,8.63 Bit/Jars. 06:00 12:00 6.00 12.00'DRILL 'E 3 P PJSA Drig.f/8044'-8731'MD(4124'TVD)(g 550 gpm,2620 psi,160 rpm,6-10k wob, 10-12k tqn,10k tqf,210k puw, 110k sow,152k rotw,10.97 ECD,Max Gas 1730,3.47 ADT,12.10 Bit/Jars.SPR @ 8324'MD(4119'ND)w/9.45 MW; #1/#2/#3 @ 20-240,@ 30-320. 12:00 18:00 - 6.00 18.00'DRILL 'E 3 P PJSA Ddg.f/8731'-9631'MD(4143'ND)@ 550 gpm 2730 psi,120 rpm,8-10k wob,11-12k tqn,9-10k tqf,207k puw. 110k sow,153k rotw,11.01 ECD,Max Gas 1070,3.26 ADT,15.36 Bit/Jars.SPR @ 9351'MD(4148'TVD)w/9.45 MW #1/#2/#3 @ 20-280,@ 30-350. 18:00 00:00 - 6.00' 24.00 DRILL -E 3 P PJSA Ddg.f/9631'-10,097'MD(4138'ND)@ 550 gpm,2730 psi,120 rpm,6-12k wob,12-13k tqn,9k tqf,205k puw, 120k sow,153k rotes,10.96 ECD,Max Gas 717,3.74 ADT,19.10 Bit/Jars. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk akngderksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgf/cm') Eq.Mud Weight(gIL) P LeakOff(kgf/cm') 2.262.84 1.244.30 OBM 1132.4 52.0 1550.5 192.9 fifil* Eni E&P Division .. Well Name: E5 Lt OR EN!Petroleum Co.Inc. Daily Report WetlCode:27983 Field Name:NIKAITCHUO •enII Date:5/3/2015 - Report#: 9 APIIUWI 50-629-23537-60-00 II II page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share)%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(mIhr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 3.48 Daily Information End Depth(mKB) End Depth(ND)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 3,704.23 1,265.85 626.67 16.38 38.3 101.0 -7.0 Overcast WC 9` WSW @ 11 MPH Daily summary operation 24h Summary Dr1g.f/10,097'-12,153'MD(4152'TVD). Operation at 07.00 Drilling ahead @ 12,713'MD 24h Forecast Dnll ahead as per SLB and Geologists in 8.75"L1 to an EST TD of 17.377'. Lithology Shows MAASP(kgflcm') Mud Weight(gIL) 1138.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 06:00 6.00 6.00 DRILL E 3 'P PJSA DrIg.6 10,097'-10,752'MD(4131'TVD)(g)550 gpm,2800 psi,120 rpm,8-10k wob,12k tqn,9k tqf,208k puw, 115k sow,153k rotw,11.18 ECD,Max Gas 881,4.1 ADT,23.20 Bit/Jars.SPR @ 10,379'MD(4135'ND)w/9.45 MW; #1/#2 @ 20-290,@ 30-360. 06:00 12:00 6.00 12.00 DRILL E 3 'P PJSA Drig.f/10,752'-11,300'MD(4139'ND)@ 550 gpm,2840 psi,120 rpm,8-12k wob,13k tqn,10k tqf,220k puw, 105k sow,154k rotw,10.96 ECD,Max Gas 1469,3.51 ADT,26.71 Bit/Jars. 12:00 18:00 6.00 18.00 DRILL E 3 P PJSA Ddg.f/11,300'-11,970'MD(4150'ND)@ 550 gpm,2920 psi,120 rpm,6-12k wob,12-13k tqn,10k tqf,225k puw, 110k sow,158k rotw,11.24 ECD,Max Gas 1146,3.6 ADT,30.31 Bit/Jars.SPR @ 11,312'MD(4139'ND)w/9.45 MW; #1/#2/#3 @ 20-300,@ 30-380. 18:00 00:00 6.00 24.00 DRILL E 3 P PJSA Ddg.f/11,970'-12,153'MD(4152'ND)@ 550 gpm,2860 psi,160 rpm,6-12k wob,13-15k tqn,10-11k tqf,225k puw,N/A sow,158k rotw,11.06 ECD,Max Gas 986,5.17 ADT,35.48 Bit/Jars.15 bbls Tourly fluid losses. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener ENI Senior Dolling Supv SIDDnlling@enipetroleum.com 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk akrigderksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgflcm') Eq.Mud Weight(gIL) P LeakOff(kgflcm') 2,262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 co..iiiit Eni E&P Division (Well Name: E5 Li OR I ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUO • 2^n Date:5/4/2015 - Report#: 10 API/UW1:50-629-23537-60-00 II I�'I page 1 of 1 Wellbore name: SP04-SE5 Li Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3047.70 68.94 442 4.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 4,423.26 1.260.42 719.02 14.27 50.4 101.0 -7.6 Overcast WC 13` WSW @ 6 MPH Daily summary operation 24h Summary Ddg_f/12,153'-14,512'MD(4135'TVD). Operation at 07.00 Drilling ahead @ 15,141'MD 24h Forecast Drill ahead as per SLB and Geologists in 8.75"L1 to an EST TD 0117,377'. Lithology Shows MAASP(kgf/cm') Mud Weight(gIL) 1138.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 06:00 6.00 6.00 DRILL E '3 P PJSA Ddg.1/12,153-12,994'MD(4151'TVD)@ 550 gpm,2960 psi,120 rpm,4-10k wob,12k tqn,10k tqf,215k puw, 110k sow,154k rotw,11.09 ECD,Max Gas 1791,3.45 ADT,38.93 Bit/Jars, 06:00 12:00 6.00 12.00 DRILL E 3 P PJSA Ddg.0 12,994'-13,366'MD(4144'TVD)@ 550 gpm,2960 psi,120 rpm,6-10k wob,13k tqn,10k tqf,210k puw, N/A sow,154k rotw,11.01 ECD,Max Gas 1416,3.93 ADT,42.86 Bit/Jars.33 bbls Tourly fluid losses.SPR @ 13,271'MD (4148'TVD)w/9.45 MW,#1/#2/#3 @20-310,@30-380. 12:00 18:00 6.00 18.00 DRILL E 3 P PJSA Ddg.1/13,366'-14,073'MD(4134'TVD)@ 550 gpm,3060 psi,120 rpm,6-10k wob,12-13k tqn,9-10k tqf,235k puw,N/A sow,158k rotw,11.24 ECD,Max Gas 1421,4.26 ADT,47.12 Bit/Jars. 18:00 00:00 6.00 24.00 DRILL E 3 P PJSA Ddg.f/14,073'-14,512'MD(4135'TVD)@ 550 gpm,3180 psi,120 rpm,6-Bk nob,13k tqn,ilk tqf,235k puw, 158k rotw,11.30 ECD,Max Gas 1157,2.63 ADT,49.75 Bit/Jars.22 bbls Tourly fluid losses.SPR @ 14,300'MD(4132' TVD)w/9.5 MW#1/#2/#3 @ 20-340,@ 30-440. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Jack Keener ENI Senior Dulling Supv SIDDnlling@enipetroleum.com 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv, SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk akrigclerksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgf/cm') Eq.Mud Weight(g/L) P LeakOtf(kgflcm°) 2,262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 Eni E&P Division Well Nm ae: ES L1 OR 1 ENI Petroleum Co.Inc. Daily Report}l Well Code:27983 Field Name:NIKAITCHUQ • APIIUWI:50-629-23537-60-00 2^nf Date:5/5/2015 - Report#: 11 II �I Ipage 1 of 1 Wellbore name: SPO4-SE5 1.1 Well Header Permit/Concession N° Operator ENI Share)%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) 5PO4-5E5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 5.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(mlhr) POB Temperature(°C) Weather Wind 5,149.60 1,256.13 726.34 14.96 48.6 101.0 -10.0 Overcast WC 4' N @ 6 MPH Daily summary operation 24h Summary Ddg.f/14,512'-16,895'MD(4120'TVD). Operation at 07.00 Drilling ahead @ 17,195'MD 24h Forecast Drill ahead to Est TD CO 17,420'.Circulate and BROOH as per K&M schedule. Lithology Shows MAASP(kgflcm') Mud Weight(gIL) 1132.4 Time Log Start End Cum ' Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 06:00 6.00 6.00 DRILL E 3 P PJSA Ddg.f/14,512'-15,224'MD(4129'TVD)@ 550 gpm,3240 psi,120-140 rpm,6-12k wob,13k tqn,11k tqf,240k puw,155k rotw,11.35 ECD,Max Gas 1326,3.84 ADT,53.59 Bit/Jars. 06:00 12:00 ' 6.00 12.00 DRILL E -3 'P PJSA Ddg.f/15,224'-15,793'MD(4145'TVD)@ 550 gpm,3300 psi,120-170 rpm,8-12k wob,13k tqn,11k tqf,230k puw,156k rotw,11.42 ECD,Max Gas 1397,3.08 ADT,56.67 Bit/Jars.26 bbls Toudy fluid losses.SPR @ 15,233'MD (4129'TVD)wl 9.5 MW;#1/#2/#3 @ 20-320,@ 30-400. 12:00 18:00 - 6.00 18.00 DRILL E -3 'P PJSA Ddg.f/15,793'-16,437'MD(4133'TVD)@ 550 gpm,3340 psi,120 rpm,6-8k wob,13-14k tqn,10-11k tqf,230k puw,155k rotw,11.64 ECD,Max Gas 1818,4.15 ADT,60.82 Bit/Jars.SPR @ 16,260'MD(4137'TVD)wd 9.5 MW;#1/ #2/#3 @ 20-360,@ 30-460. 18:00 00:00 - 6.00 24.00 DRILL E 3 'P PJSA Ddg.f/16,437'-16,895'MD(4120'ND)@ 550 gpm,3410 psi,120 rpm,6-8k mob,13k tqn,9-10k tqf,235k puw. i 152k rotw,11.69 ECD,Max Gas 1400,3.89 ADT,64.71 Bit/Jars.71 bbls Toudy fluid losses. Daily Contacts Position Contact Name i Company Title E-mail Office 1 Mobile Eni representative 'Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com .907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk akrigcerksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Dulling Tool Pusher rig15@doyondnIling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondnIling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgflcm') Eq.Mud Weight(gIL) P LeakOff(kgflcm') 2,262 84 1 244.30 OBM 1132.4 52.0 1550.5 192.9 IfifY* Eni E&P DivisionWell Name:. E5 L1 OR EN/Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUQ • enn Date:5/6/2015 - Report#: 12 API/UWI:50-629-23537-60-00 II II II page 1 of 1 Wellbore name: SPO4-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth)m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(mlhr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 6.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(mlhr) POB Temperature(°C) Weather Wind 5,309.62 1,251 65 160.02 4.23 37.8 105.0 -8.0 Overcast WC-4` Daily summary operation 24h Summary Dig.f/16,895'-17,420'MD(4105'TVD)Target TD.CBU X2 while BROOH to 17,196'.BROOH as per K&M schedule f/17,196'-11,502'. Operation at 07.00 BROOH @ 10,662'MD 24h Forecast BROOH as per K&M f/11,502'-7245'(Jars @ BO Window).CBU X3.Wash BHA through window.At 7393'CBU X3 or until hole is clean while wt.up to 9.6 ppg.Pump dry job and POOH L/D BHA. Lithology Shows MAASP(kgf/cm') Mud Weight(gIL) 1132.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 06:00 6.00 6.00 DRILL E 3 P PJSA DrIg.f/16,895'-17,420'MD(4105'TVD)@ 550 gpm,3460 psi,120 rpm,6-12k wob,14k tqn,11-12k tqf,235k puw, 153k rotw,11.79 ECD,Max Gas 1171,4.23 ADT,68.94 BW Jars.SPR @ 17,420'MD(4105'TVD)w/9.5 MW;#1/02/1/3 • @ 20-400,@ 30-490. 06:00 09:00 3.00 9.00 DRILL E 4 P PJSA CBU X2 while BROOH @ 550 gpm,3460 psi,140 rpm,12k tq,f/17,420'-17,196'MD. 09:00 12:00 3.00 12.00 DRILL E 4 P PJSA BROOH as per K&M 1/17,196'-16,544'@ 550 gpm,3330 psi,140 rpm,13k tq,215k puw,95k sow,154k rotw,11.5 ECD,67 bbls Tourly fluid losses. 12:00 18:00 6.00 18.00 DRILL 'E 4 P PJSA BROOH f/16,544'-14,209'@ 550 gpm,3070 psi,140 rpm,10k tq,11.02 ECD,205k puw,105k sow,153k rotw 18:00 00:00 6.00 24.00 DRILL E 4 P PJSA BROOH f/14,209'-11,502'@ 550 gpm,2870 psi,140 rpm,9k tq,10.84 ECD,200k puw,115k sow,153k rotw.54 bbls Tourly fluid losses. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Em representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Em representative Mitch Billington ENI Rig Clerk akrigclerksdoyon 15@enipetroleum.corn 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kgflcm') Eq.Mud Weight(gIL) P LeakOff(kgflcm°) 2,262.84 1,244.30,OBM 1132.4 52.0 1550.5 192.9 14Ent E&P Division Well Name: E5 L1 OR EN/Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUQ 2^n Date:5/7/2015 - Report#: 13 APIIUWI:50-629-23537-60-00 �I II I� page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(°'o) Well Configuration type SOUTH PASS 46(FL.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 399 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 7.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 5,309.62 1,251.65 0.00 101.0 -8.9 Overcast WC 5° E @ 8 MPH Daily summary operation 24h Summary BROOH f/11,502'-7803'.Work BHA through window with slight pack off and over pull to 7393'.CBU X 3 while reciprocating and weighing mud system to 9.6 ppg.Monitor well and C/O handling equip.to 4.5".POOH and pump dry job @ 7010'.Cont to POOH to 6355'and encountered 25k over pull.RIH to 6440'and CBU while reciprocating.74 bbls Daily fluid losses. Operation at 07.00 BROOH @ 6,848'MD 24h Forecast Continue to CBU ed 120 rpm until shaker cleanup.POOH and observe well conditions.If over pull is seen,C/O saver sub and BROOH until hole unloads.POOH and UD BHA.Clear and clean ng floor and load Baker Whip Stock retrieval tools,M//U and RIH and latch onto Whip Stock and pull free.POOH. Lithology Shows MAASP(kgflcm') Mud Weight(g/L) 1150.3 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 06:00 6.00 6.00 DRILL E 4 P PJSA BROOH f/11,502'-9634'@ 550 gpm,2620 psi,140 rpm,10k tq,192k puw,125k sow,152k rotw,10.62 ECD. 06:00 12:00 6.00 12.00 DRILL E 4 P PJSA BROOH f/9634'-7803'@ 550 gpm,2450 psi,140 rpm,8k tq,10.9 ECD.45 bbls Toady fluid losses. 12:00 19:30 7.50 19.50 DRILL E 4 P PJSA Work BHA through window f/7803'-7393'400 gpm,1390 psi,120 rpm,6-9k tq,180k puw,135k sow,150k rotw. Observed slight pack off and overpull.Cont.to pull without rotating. 19:30 '21:00 1.50 21.00 DRILL E 7 P 'PJSA CBU X3 while reciprocating @ 550 gpm,2400 psi,40 rpm,6-7k tq,180k puw,135k sow,150k rotw,f/7393'-7295' while weighing up mud system to 9.6 ppg. 21:00 '21:30 0.50 21.50 DRILL E 20 P PJSA Monitor well and C/O handling equipment to 4.5". 21:30 '23:00 1.50 23.00 DRILL E -4 P PJSA POOH w14.5"DP f/7393'-6355',180k puw,130k sow.Pump dry job @ 7010'. 23:00 '00:00 1.00 24.00 DRILL E 7 P PJSA Encounter tight spot @ 6355'(25k over pull).RIH to 6440'and CBU while reciprocating @ 550 gpm,2350 psi,40 rpm,7k tq,180k puw,130k sow,150 rotw.29 bbls Tourly fluid losses. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Wade Thomas ENI Eni representative Mitch Billington ENI Rig Clerk akrigderksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push i Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgflcm') Eq.Mud Weight(g/L) P LeakOff(kgflcm2) 2,262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 a* Eni E&P Division } Well Name: ES L1 OR J ENI Petroleum Co.Inc. Daily Repo) t WellCode:27983 Field Name:NIKAITCHUQ eDate:5/812015 - Report#: 14 APIIUWI:50-629.23537.60-00 2" "l ii page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share)%) Well Configuration type SOUTH PASS 46(F L) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 8.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 5,309.62 1,251.65 0.00 103.0 0.6 Overcast WC 31' E @ 5 MPH Daily summary operation 24h Summary RIH to 7390',C/O saver sub to 4.5"and BROOH to 1222'as per K&M.POOH and L/D BHA.M/U Baker Whip Stock retreival assy,Orient and RIH to 1500'and perform SHT.Cont.to RIH w/5"DP and fill every 2000'to 5628'. Operation at 07.00 RIH W/Wwipstock ASSY @ 7,415' 24h Forecast Cont.to RIH to TO Whip Stock and wash down 180 degrees from latch up.P/U,Orient and latch onto WS.Release WS,POOH and UD same. Lithology Shows MAASP(kgflcm') Mud Weight(gIL) 1150.3 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 00:30 0.50 0.50 DRILL E 7 P PJSA Circulate @ 550 gpm,2210 psi,120 rpm,8k.Blow down top-drive. 00:30 01:00 0.50 1.00 DRILL E 4 -P PJSA RIH f/6440'-7390'w/4.5"DP,180k puw,125k sow to clean out 9 5/8"csg f/TO window. 01:00 03:00 2.00 3.00 DRILL E 25 P PJSA C/O saver sub to 4.5",service crown,blocks,top-drive and draw works. 03:00 06:00 3.00 6.00 DRILL E 4 P PJSA BROOH f/7390'-5397'@ 550 gpm,2070 psi,120 rpm,8k tq,162k puw,136k sow,158k rotw,10.37 ECD. 06:00 11:30 5.50 11.50 DRILL E 4 P PJSA BROOH f/5397'-1222'@ 550 gpm,1210 psi,120 rpm,2k tq,110k puw,110k sow,110k rotw. 11:30 12:00 0.50 12.00 DRILL E 4 P PJSA POOH f/1222'-386'.24 bbls Tourty fluid losses. 12:00 13:00 1.00 13.00 DRILL E 20 P PJSA Clean and clear ng floor of OBM.CIO handling equipment to 5".Bring Source Pig to rig floor 13:00 15:00 2.00 15.00 DRILL E 4 P PJSA L/D BHA#11. 15:00 16:30 1.50 16.50 DRILL E 20 P PJSA Clear rig floor of BHA tools. 16:30 19:00 2.50 19.00 DRILL E 20 P PJSA C/O saver sub to 5"and shim. 19:00 21:00 2.00 21.00 DRILL E 4 P P.ISA M/U Baker Whip Stock retreival BHA#12 and Orient and RIH to 122'. 21:00 22:00 1.00 22.00 DRILL E 4 P PJSA RIH to 1500'and perform Shallow Hole Test @ 350 gpm,1020 psi. 22:00 00:00 2.00 24.00 DRILL E 4 P PJSA RIH to 5628',160k puw,140 sow.2 bbls Tourly fluid losses. Daily Contacts Position Contact Name Company Title E-mail Office J Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.cow 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Wade Thomas ENI Eni representative Mitch Billington ENI Rig Clerk akrigclerksdoyonl5@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgf/cm') Eq.Mud Weight(gIL) P LeakOff(kgflcm') 2,262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 Eni E&P Division Well Name: ,E5 L1 OR I ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUQ •e^II II Date:5/9/2015 - Report#: 15 APIIUWI:50-629-23537-60-00 II II page 1 of 1 Wellbore name: SP04-SE5 Li Well Header Permit/Concession N• Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 9.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 5,309 62 1.251.65 0.00 103.0 -3.9 Overcast WC 13` SE @ 15 MPH Daily summary operation 24h Summary RIH w/WS Retieval assy and latch on to WS.Pull free and observed 33 bbl loss.Monitor well w/58 B/HR losses.POOH UD retrieval and Whip Stock assemblies.17 lbs metal recovered f/magnets.P L clean out BHA#13 and RIH to 7405'.Wash and ream fl 7470'-7444'@ 5 bpm,10 rpm.119 bbls AM fluid losses,17 bbls PM fluid losses. Operation at 07.00 POOH wl clean out assy.#13 @ 2,823 24h Forecast Complete circulation and POOH.Remove metal f/magnets and boot baskets and weigh.UD clean out assy.R/U and perform BOPE testing. Lithology Shows MAASP(kgilcm') Mud Weight(g/L) 1138.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 01:00 1.00 1.00 DRILL E 4 'P PJSA RIH w/Reteiving Hook,HWDP,String Float,Extreme String Magnet,5"pup jt,MWD Telescope,Bumper Sub, Bowen Jars,Pump Out Sub XO to TT525,f/5628'-7213',175k puw,140k sow,filling every 2000'. 01:00 02:30 1.50 2.50 DRILL E 25 P PJSA Cut and slip 136'Dng.line,grease IBOP's,MP2 crown,blocks,draw works and top-drive. 02:30 -03:00 0.50 3.00 DRILL E 4 P PJSA RIH f/7213'-7311',P/U single and 1 stand,orient 150 L and wash down to 7417',175k puw,143k sow. 03:00 04:30 1.50 4.50 DRILL E 19 P PJSA Wash Whip Stock slot and P/U,Orient to 37 R and latch onto Whip Stock.Confirm all measurements and P/U 30k ^ over to open unloader valve.P/U to 100k over and slack off to charge jars.P/U to 75k over and unseat anchor w/ O I immediate fluid loss.33 bbls to regain returns. i 04:30 05:00 0.50 5.00 DRILL E 20 'P PJSA Monitor well losses @ 58 BPHR. 05:00 12:00 7.00 12.00 DRILL E 4 'P PJSA POOH f/7370'-1392'.119 bbls Tourly fluid losses. 12:00 13:00 1.00 13.00 DRILL E 4 'P PJSA POOH f/1392'-121'retrieval BHA. 1.) 13:00 '14:00 1.00 14.00 DRILL E 4 •P PJSA UD Retrieval BHA f/121'to Whip Stock. 14:00 '15:30 1.50 15,50 DRILL E 4 •P PJSA UD Whip Stock assy.NOTE;10 lbs metal on upper magnet,7 lbs on lower magnet. 15:30 '16:30 1.00 16.50 DRILL E 20 U PJSA Clear and clean rig floor.P/U tools for clean out run. 16:30 '18:00 1.50 18.00 DRILL E 4 U PJSA M/U clean out BHA#13 and RIH to 125'.Jetted bullnose,String Magnet,XO,Grabitz String Magnet,Extreme String Magnet,Pup,5"HWDP,Float,Double Pin,2-7"Boot Baskets,Bit Sub,Bumper Sub,Bowen Jars,Pump Out Sub,XO to TT525. 18:00 22:30 4.50 22.50 DRILL E 4 U PJSA RIH f/125'-7405',175k puw,168k sow. 22:30 00:00 1.50 24.00 DRILL E 7 U PJSA Break circulation @ 2 bpm,250 psi and wash down to 7470'.Establish 10 rpm,168k rotw,5k tq.Increase to 5 bpm, 630'psi,wash and ream up to 7444'and down to 7470'.17 bbls Tourty fluid losses. I Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Wade Thomas ENI Eni representative Mitch Billington ENI Rig Clerk akrigclerksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikofl ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher ng15@doyondnlling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher ng15@doyondnlling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) ND(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgf/cm') Eq.Mud Weight(g/L) P LeakOff(kgf/cm') 2,262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 r"" Eni E&P Division Well Name: ..,E5 L1 OR � ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUQ � e Date:5/10/2015 - Report#: 16 API/UWI:50-629-23537-60-00 21I IIWellbore name: SPO4-SE5 L1 page 1 of 1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD..,Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1245.98 3,047.70 68.94 44.2 10.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 5,309.62 1251.65 0.00 104.0 0.0 Overcast WC 31' NE @ 5 MPH Daily summary operation 24h Summary Circ.8,condition mud to 9.4 ppg.POOH f/7309'-124'.UD clean out assy.and recovered 14 lbs of metal f/magnets.Wash Stack.Pull wear bushing and installed test plug.Test BOPE as per AOGCC spec's and witnessed by Matt Herrera.P/U Baker and GBR equip.to rig floor and R/U.M/U Baker Sealbore Diverter assy.and SHT MWD.Perform Sealbore Diverter release lest.RIH SB Diverter assy.to 5728'. Operation at 07.00 DROPPED RABBIT POOH @ 7,030' 24h Forecast Cont.to RIH w/Sealbore Diverter assy.and orient for latchup.Wash down and latch into MLZXP w/30k down.P/U to vert'and release from SB Diverter as per Baker.POOH and UD running tool and BHA. Lithology Shows MAASP(kgftem') Mud Weight(gIL) 1132.4 Time Log Start 1 End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 01:00 1.00 1.00 DRILL E 7 U `PJSA Circulation and condition @ 7309'@ 212 gpm,520 psi,10 rpm,5k tq,mud balanced @ 9.4 ppg.Blow down top- drive.Well static. 01:00 04:30 3.50 4.50 DRILL E 4 U PJSA POOH f/7309'-124',85k puw/sow. 04:30 07:00 2.50 7.00 DRILL E 4 U 'PJSA UD clean out BHA.Recovered 14 lbs of metal from magnets. 07:00 07:30 0.50 7.50 DRILL E 20 U PJSA Clear and clean ng floor. 07:30 08:00 0.50 8.00 DRILL E 7 U PJSA M/U stack washer and wash stack @ 340 gpm,30 rpm.UD stack washer. 08:00 08:30 0.50 8.50 DRILL C 20 P 'PJSA Vetco pull wear bushing and installed upper test plug. 08:30 '09:30 1.00 9.50 DRILL C 20 P PJSA R/U to test BOPE. 09:30 -12:00 2.50' 12.00 DRILL C 12 P PJSA Testing BOPE w/4.5"test jt.as per AOGCC Specs.Matt Herrera Witnessed.14 bbls Tourly fluid losses. 12:00 15:30 3.50- 15.50 DRILL C 12 P PJSA Cont.BOPE testing w/4.5"then 5.5"test jts. 15:30 16:30 1.00 16.50 DRILL C 20 P -PJSA Pull test plug and set wear bushing.Blow down and ng down from testing. 16:30 •17:00 0.50 17.00 DRILL E 20 P PJSA P/U Baker and GBR tools to rig floor and rig up. 17:00 •19:30 2.50' 19.50 DRILL G 4 P PJSA M/U Sealbore Diverter assy.to 126'.Seal assy,XO liner pup,Ram ML Production Anchor,2-Liner pups, Camco DB Nipple,Liner pup,Sealbore Diverter,FJD Diverter running tool,MWD Telescope,XO to TT525. 19:30 '20:30 1.00' 20.50 DRILL G 12 P PJSA Shallow hole test MWD @ 300 gpm,370 psi.Perform Sealbore Diverter Release test @ 530 gpm,1070 psi. 20:30 •00:00 3.50' 24.00 DRILL G -4 P PJSA RIH w/Sealbore diverter on 5"DP to 5728',162k puw,142k sow.8 bbls Tourty fluid losses. _Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative 'Bruce Simonson 'ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Wade Thomas ENI Eni representative Mitch Billington ENI Rig Clerk akngclerksdoyon15@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Dulling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Dulling Tour Pusher ng15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date CASING 2,315.87 4/13/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgflcm') Eq.Mud Weight(gIL) P LeakOff(kgf/cm') 2,262 84 1244.30 OBM 1132.4 52.0 1550.5 192.9 119* Eni E&P Division Well Name: 05 L1 OR ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUQ • Date:5/11/2015 - Report#: 17 APUTAM:50-629-23537-60-00 2" " page 1 of 1 Wellbore name: SPO4-SE5 L1 Well Header Permit/Concession N° Operator ENI Share)%) Well Configuration type SOUTH PASS 46(F L) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 11.48 Daily Information End Depth(mKB) End Depth(TVD)(...Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 5,309.62 1,251.65 0.00 103.0 0.0 Overcast WC 24' SW @ 18 MPH Daily summary operation 24h Summary RIH w/Sealbore Diverter f/5728'-7408'.Circ.@ 300 gpm and work into TO Liner down to TO SBR.P/U and Orient tool string and latch up.P/U 50k overpull to verify latch up.Set down 30k and inc. pump to 538 gpm,1850 psi to release running tool.TO SB Diverter @ 7400'.POOH and L/D MWD and running tool.R/U to run Liner.M/U and RIH wd 5.5"slotted Liner as per tally to 9959'.R/D GBR equip.and P/U Baker Ram Liner Hanger and install Double cup assy.wi space out pups and SBD Locator/No-Go Sub.M/U hanger assy.and RIH. Operation at 07.00 RIH WI 5.5"slotted liner on 5"DP @ 16,150' 24h Forecast Install XO and Run Liner in hole on 5"DP.Obtain parameters and wash down to SBD while rotating.Latch up and check all information.Drop Ball and release running tool as per Baker.Continue as per Baker. Lithology Shows MAASP(kgflcm') Mud Weight(gIL) 1132.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 00:30 0.50 0.50 DRILL 'G 4 P 'P IRA RIH w/Sealbore Diverter f/5728'-7408',180k puw,142k sow. 00:30 02:30 2.00 I 2.50 I DRILL G 19 P PJSA Baker work mule shoe seal assy.into TO liner and to TO SBR.Orient Sealbore Diverter and work down through SBR and latch up Ram ML Production Anchor.P/U 50k over to verify latch and double check all numbers.Set down 30k and pump @ 538 gpm,1850 psi to release FJD Diverter conning tool.After release 178k puw,145k sow.Top of Sealbore Diverter @ 7400'. 02:30 06:00 3.50 6.00 DRILL G "4 P PJSA POOH w1 FJD Diverter running tool f/7408'-54'.Dropped 2 15/16"rabbit on STD#77. 06:00 06:30 0.50 6.50 DRILL G 4 P PJSA L/D MWD and running tool. 06:30 07:00 0.50 7.00 DRILL 'G 20 P PJSA Clear and clean ng floor. 07:00 07:30 0.50 7.50 DRILL G 20 P PJSA P/U 8 M/U Volant CRT,Bail extensions,single jt elevators,ng tongs and dog collar. 07:30 12:00 4.50 12.00 I DRILL G 4 P PJSA M/U shoe jt.and 5.5"slotted liner as per tally and RIH to 2796',100k puw,107k sow.8 bblsTourly fluid losses. 12:00 -18:30 6.50 18.50 DRILL 'G 4 P Y.r^a BILI tad S 5"15 ca 1 on Hvn 591 Slnttrd I iner f/2796'-8320',150k puw,120k sow.On Jt.#182,Est.135k rotw@ 30 rpm,5k tq. 18:30 -119:00 0.50 19.00 DRILL G 20 U Safety Stand Down to discuss pinch point on floor hand's left hand ring finger. 19:00 21:00 2.00 21.00 DRILL G 4 P PJSA Cont.to M/U and RIH W15.5"slotted liner f/8320'-9959',160k puw,112k sow,238 jts slotted,11 blanks 21:00 22:00 1.00- 22.00'DRILL -G 20 P PJSA R/D GBR equipment and clear and clean ng floor. 22:00 00:00 2.00 24.00 DRILL G '20 P PJSA P/U Baker RAM Liner Hanger assy.to rig floor and B/O Ported XO Bushing.P/U double cup assy and M/U on bottom of running tool.P/U space out pups and M/U on bottom of cup assy.Bottom of space out pup has SBD Locator/No-Go sub. Install Ported XO into liner and sting running tool assy.into liner and M/U connections.RIH w/Ram Liner Hanger.2 bbls Tourly fluid losses. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Bruce Simonson 'ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Wade Thomas ENI Eni representative Mitch Billington ENI Rig Clerk akrigderksdoyonl5@enipetroleum.com 907-685-0722 Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770 Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher ng15@doyondnlling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher ng15@doyondnlling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date LINER 51/2 4.950 L-80 2,254.06 5,302.00 5/12/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgf/cm') Eq.Mud Weight(gIL) P LeakOff(kgf/cm') 2262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 Eni E&P Division ..} Well Name: c5 L1 OR ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUO • 2�� ��I�nIfi* Date:5/12/2015 - Report#: 18 APIIUWI:50-629-23537-60-00 page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(mlhr) DFS(days) SP04-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 12.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(mlhr) POB Temperature(°C) Weather Wind 5,309.62 1,251.65 0.00 107.0 0.0 Overcast WC 28' W @ 6 MPH Daily summary operation 24h Summary RIH F/10,007'to 17,921'MD W/5.5"Liner on 5"D.P.HST 230K,SLK 90K.No losses.Wash down to 17,395'MD @ 2 bpm,250 PSI as per Baker Rep onsite.Latch Hanger to RAM Seal Assy.Set down 25K,snap out 30K over P/U weight.Set down 25K,drop 29/32"ball,pump 200 bbl,69 bbl over calculated volume.Ball did not seat.Mechanical release running tool W/3.5 turns to left.HST 175K.Pull up 80',Circ.@ 6 bpm,350 PSI to clean seal bore diverter ID.Circ.3X Pipe volume @ 6 bpm,350 PSI to seat ball.Ball did not seat.Blow down TDS-8.Monitor well,static.POOH F/7,406'to 125'MD W/5" D.P.Calculated displacement 61 bbl,actual 69 bbl,lost 8 bbl.UD Liner Running Tool and Inner string BHA as per Baker Rep.Lost 16 bbl for tour.Clean and clear rig floor.Service rig,grease TDS-8. P/U Baker and GBR completion tools to rig floor and R/U.PJSM W/all essential personnel for P/U SLZXP.P/U M/U SLZXP/LEM and Slim Pulse MWD to 109'MD.RIH W/5"D.P.to 200'and perform shallow hole test as per Schlumberger MWD at 85 GPM,400 PSI.Cont.to RIH to 7,298'MD.Filling D.P.every 2,000'.HST 180K,SLK 145K.No losses. Break Circ.@ 2 bpm,420 PSI,Orient LEM. Wash down to 7,392'MD.P/U stand 79 and break Circ.@ 2 bpm,420 PSI.Orient 10°Right and slack off to set LEM. Operation at 07.00 Displace Faze Pro to 9.4 ppg Brine. 24h Forecast Set LEM as per Baker Rep onsite.Press.up to release from LEM.Test backside to 1,500 PSI.Displace Faze Pro to 9.4 ppg Brine.Slip and cut drilling.POOH Laying down 5"D.P.to Pipe Shed. Lithology Shows MAASP(kgflcm') Mud Weight(gIL) 11324 Time Log Start End Cum ( Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 04:00 4.00 4.00 DRILL G 4 P PJSA RIH F/10,007'to 17,921'MD W/5.5"Liner on 5"D.P.HST 230K,SLK 90K.No losses. 04:00 06:30 2.50 6.50 DRILL G 19 P PJSA Wash down to 17,395'MD @ 2 bpm,250 PSI as per Baker Rep onsite.Latch Hanger to RAM Seal Assy.Set down 25K,snap out 30K over P/U weight.Set down 25K,drop 29/32"ball,pump 200 bbl,69 bbl over calculated volume.Ball did not seat.Mechanical release running tool W/3.5 tums to left.HST 175K.Pull up 80'.Circ.@ 6 bpm,350 PSI to clean seal bore diverter ID. 06:30 08:00 1.50 8.00 DRILL G 7 P PJSA Circ.3X Pipe volume @ 6 bpm,350 PSI to seat ball.Ball did not seat.Blow down TDS-8.Monitor well,static. 08:00 11:00 3.00 11.00 DRILL '0 4 P PJSA POOH F/7,406'to 125'MD W/5"D.P.Calculated displacement 61 bbl,actual 69 bbl,lost 8 bbl. 11:00 12:00 1.00 12.00 DRILL .G 20 P PJSA UD Liner Running Tool and Innerstring BHA as per Baker Rep.Lost 16 bbl for tour. 12:00 12:30 0.50 12.50 DRILL G '20 P PJSM Clean and clear rig floor. 12:30 13:00 0.50' 13.00 DRILL E 25 P PJSA Service rig,grease TDS-8. 13:00 14:00 1.00' 14.00'DRILL G 20 P PJSM P/U Baker and GBR completion tools to rig floor and R/U. 14:00 18:00 4.00' 18.00 DRILL '0 20 P PJSM WI all essential personnel for P/U SLZXP.P/U M/U SLZXP/LEM and Slim Pulse MWD to 109'MD. 18:00 23:00 5.00 23.00'DRILL 'G 4 P PJSA RIH W/5"D.P.to 200'and perform shallow hole test as per Schlumberger MWD at 85 GPM,400 PSI.Cont.to RIH to 7,298'MD.Filling D.P.every 2,000'.HST 180K,SLK 145K.No losses. 23:00 00:00 1.00' 24.00 DRILL G 19 P PJSA Break Circ.@ 2 bpm,420 PSI,Orient LEM.Wash down to 7,392'MD.P/U stand 79 and break Circ.@ 2 bpm,420 PSI.Orient 10°Right and slack off to set LEM. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Eni representative Mitch Billington ENI Rig Clerk akrigderksdoyon15@enipetroleum.com 907-685-0722 Eni representative Troy England ENI HSE Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.corn 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.corn 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date LINER 51/2 4.950 L-80 2,254.06 5,302.00 5/12/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kgflc m') Eq.Mud Weight(g/L) P LeakOff(kgf/cm') 2,262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 Eni E&P Division Well Name: E5 a OR ft* ENI Petroleum Co.Inc. Daily Report Well Code:27983 Field Name:NIKAITCHUO • 2 II�II Date:5/13/2015 - Report#: 19 IIU APWI:50-629-23537-60-00 r page 1 of 1 Wellbore name: SP04-SE5 L1 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.L) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43_ 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) 5PO4-SE5 L1 DRILLING 4/30/2015 4,077.31 1,245.98 3,047.70 68.94 44.2 13.48 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 5,309.62 1,251.65 0.00 113.0 -2.2 Overcast WC 17' NE @ 22 MPH Daily summary operation 24h Summary Set LEM as per Baker Rep onsite and Co Rep:Orient 10°Right and set down 15K to confirm latch.LEM set at 45°Right.Drop 1.625"Ball,ball set @ 97 bbl away.Press.up to 1,000 PSI for 5 Min.Cont. Press.up to 3,000 PSI for 10 Min.Cont.to Press.up to 3,600 PSI for 5 Min.Seen Neutralizer at 3,200 PSI.Cont.Press.up to 4,000 PSI for 5 Min.SLK off 30K.Bleed off Press.Test IA to 1,500 PSI for 10 Min.All charted.P/U 6'to expose Dog Sub,set down 55K on SLZXP Packer.P/U 6'rotate 20 RPM set down 65K to confirm SLZXP set.Stand back 1 stand 5"D.P.to 7,364'MD.Top of SLZXP 7,327' MD.PJSM W/all essential personnel for displacement.Off load 500 bbl OBM F/Pits.Displace Faze Pro W/9.4 ppg 3%KCUNaCI Brine as per MI Swaco Plan Forward.Pump 45 bbl LVT,86 bbl HiVis Citric Acid spacer and 526 bbl 9.4 ppg Brine @ 7 bpm ICP 220 PSI FCP 160 PSI.Cut and slip drilling line.Service TDS-8,Hook,Blocks,Drawworks.SIMOPS Clean surface Equip.of OBM/Brine interface.POOH F/7,363'MD laying down 5"D.P.to Pipe Shed.PJSM UD SLZXP running tool and Slim Pulse MWD as per Baker and Schlumberger MWD onsite.Clear rig floor.Lay down 5"and 4.5" D.P.from Derrick using Mouse Hole.Pull Wear Bushing as per Vetco Grey Rep onsite.Clean and clear ng floor.Lost 17 bbl total today. Operation at 07.00 R/U Baker and Halliburton Equip. 24h Forecast R/U Baker spooliing unit and Halliburton Wire Line.Hange sheaves and string up ESP and CAP lines.R/U GBR Volant tools and Equip.P/U M/U Pump Assy.and 7"Shroud.RIH W/4.5"Tubing. Lithology Shows MAASP(kgflcm') Mud Weight(g/L) 1126.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 0230 2.50 2.50 DRILL G 19 P PJSA Set LEM as per Baker Rep onsite and Co Rep:Orient 10'Right and set down 15K to confirm latch.LEM set at 45° Right.Drop 1.625"Ball,ball set @ 97 bbl away.Press.up to 1,000 PSI for 5 Min.Cont.Press.up to 3,000 PSI for 10 Min. Cont.to Press.up to 3,600 PSI for 5 Min.Seen Neutralizer at 3,200 PSI.Cont.Press.up to 4,000 PSI for 5 Min.SLK off 30K.Bleed off Press.Test IA to 1,500 PSI for 10 Min.All charted.P/U 6'to expose Dog Sub,set down 55K on SLZXP Packer.P/U 6'rotate 20 RPM set down 65K to confirm SLZXP set.Stand back 1 stand 5"D.P.to 7,364'MD.Top of SLZXP 7,327'MD. 02:30 06:00 3.50 6.00 DRILL G 9 P PJSM W/all essential personnel for displacement.Off load 500 bbl OBM F/Pits.Displace Faze Pro W/9.4 ppg 3% KCUNaCI Brine as per MI Swam Plan Forward.Pump 45 bbl LVT,86 bbl HiVis Citric Acid spacer and 526 bbl 9.4 ppg Brine @ 7 bpm ICP 220 PSI FCP 160 PSI.HST 184K,SLK 135K 06:00 07:30 1.50 7.50 DRILL E 25 P PJSA Cut and slip drilling line.Service TDS-8,Hook,Blocks,Drawworits.SIMOPS Clean surface Equip.of OBM/Brine interface. 07:30 12:00 4.50 12.00 DRILL E 4 P PJSA POOH F/7,363'to 2,793'MD laying down 5"D.P.to Pipe Shed.Caiclulated displacement 38 bbl,actual 45 bbl,lost 7 bbl. 12:00 14:00 2.00 14.00 DRILL E 4 P PJSA POOH F/2,793'MD laying down 5"D.P.to Pipe Shed.Caiclulated displacement 21 bbl,actual 6 bbl,lost 5 bbl. 14:00 15:30 1.50 15.50 DRILL G 20 P PJSM UD SLZXP running tool and Slim Pulse MWD as per Baker and Schlumberger MWD onsite.Clear rig floor. 15:30 23:00 7.50 23.00'DRILL E 20 P PJSM Lay down 5"and 4.5"D.P.from Derrick using Mouse Hole.Lost 10 bbl. 23:00 23:30 0.50 23.50 DRILL C 19 P PJSA Pull Wear Bushing as per Vetco Grey Rep onsite. 23:30 00:00 0.50 24.00 DRILL E 22 P PJSA Clean and clear rig floor. Daily Contacts Position • Contact Name Company Title E-mail Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Eni representative Troy England ENI HSE Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Steve Dambacher Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher ng15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date LINER 51/2. 4.950 L-80 2,254.06 5,302.00 5/12/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kgflcm') Eq.Mud Weight(g/L) P LeakOff(kgflcm') 2.262.84 1,244.30 OBM 1132.4 52.0 1550.5 192.9 iir osik 1 Eni E&P Divisionwell Name: JE5 OR I ENI Petroleum Co.Inc. Daily Report WeliCode:27982 Field Name:NIKAITCHUQ • 2^n II Date:5/14/2015 - Report#: 1 APIIUWI 50-629-23537-00-00 II II page 1 of 1 Wellbore name: SP04-SE5 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(m/hr) DFS(days) SP04-5E5 COMPLETION 42.42 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 0.00 109.0 -3.3 Overcast WC 5'F NE @ 48 MPH Daily summary operation 24h Summary Clean and clear rig floor of OBM and non-essential tools and Equip.Load Pipe Shed W/ESP Pump and Motor ASSY.Load rig floor W/completion running Equip.SIMOPS Clean Mud Pits and move Pump#3.PJSM W/out of scope lifting as per Co Rep onsite.Hang WSP and CAP line sheaves in Derrick.SIMOPS:PJSM Install ESP and CAP Spools in Spooling unit.Cont.to clean Mud Pits and Rockwasher.PJSM W.Centedift.As per Centerlifl Rep onsite,M/U Gas Tube,7"23#Shroud,TTC X/O,1 Joint 4.5"Tubing and DGU Assy and Pump Assy.Co Rep onsite.PJSM R/U Halliburton slick line.Set Pump Assy.,Pack Off and test tool.Test Pack Off to 1,000 PSI for 15 Min.charted.Pull test tool,set tubing stop and R/D Slick Line.Stand back Pump Assy in Derrick.M/U Motor Assy and service W/Co Rep onsite.Terminate Tech line to Gauge and install Motor Lead.String up ESP and CAP lines.M/U Drill tubing X/O section to motor section.Terminate and test Tech line to DGU,test to 5,000 PSI.Secure all lines to 166'MD.R/U GBR Volant tool and WU joint#2 4.5"Tubing.Splice motor lead to ESP as per Baker Centerlift Reps,Witnessed by ENI Electrician onsite.Test connection. RIH 4.5"12.5#L-80 HYD563 Tubing and Motor Assy,ESP and CAP lines F/166'to 1,235'MD.HST 95K,SLK 95K.Test ESP cable every 1,000'.Lost 6 bbl for today. Operation at 07.00 RIH 4.5"Tubing and Motor Assy.@ 3,200'MD. 24h Forecast Cont.to RIH W/4.5"Tubing ESP and CAP lines to 6,276'MD.P/U M/U Hanger and terminate lines.N/D BOPE and N/U Tree. Lithology Shows MAASP(kgflcm') Mud Weight(g/L) 1126.4 Time Log Start End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 03:00 3.00 3.00 COMP K 20 P PJSA Clean and clear rig floor of OBM and non essential tools and Equip.Load Pipe Shed W/ESP Pump and Motor ASSY.Load rig floor W/completion running Equip.SIMOPS Clean Mud Pits and move Pump#3. 03:00 04:00 1.00 4.00 COMP K 20 P PJSM W/out of scope lifting as per Co Rep onsite.Hang WSP and CAP line sheaves in Derrick.SIMOPS:PJSM Install ESP and CAP Spools in Spooling unit.Cont.to clean Mud Pits and Rockwasher. I) - N 04:00 07:00 3.00 7.00 COMP K 20 P PJSM W.Centertift.As per Centerlifl Rep onsite,M/U Gas Tube,7"23#Shroud,TTC X/O,1 Joint 4.5"Tubing and DGU L/� Assy and Pump Assy.Co Rep onsite. 07:00 10:00 3.00 10.00 COMP R 20 P PJSM R/U Halliburton slick line.Set Pump Assy.,Pack Off and test tool.Test Pack Off to 1,000 PSI for 15 Min.charted. 04 Pull test tool,set tubing stop and R/D Slick Line. 10:00 12:00 2.00 12.00 COMP K -20 P PJSA Stand back Pump Assy in Derrick.M/U Motor Assy and service W/Co Rep onsite.Lost 3 bbl for tour. 12:00 14:00 2.00 14.00 COMP K 20 P PJSM Cont.M/U Motor Assy and service.Terminate Tech line to Gauge and install Motor Lead. 14:00 18:00 4.00 18.00 COMP K 20 P PJSM String up ESP and CAP lines.M/U Drill tubing X/O section to motor section.Terminate and test Tech line to DGU, test to 5,000 PSI.Secure all lines to 166'MD. 18:00 18:30 0.50 18.50 COMP K '20 P PJSM R/U GBR Volant tool and M/U joint#2 4.5"Tubing. 18:30 '21:00 2.50- 21.00 COMP K 20 P PJSA Splice motor lead to ESP as per Baker Centeriift Reps,Witnessed by ENI Electrician onsite.Test connection. 21:00 00:00 3.00 24.00 COMP K 4 P PJSM RIH 4.5"12.58 L-80 HYD563 Tubing and Motor Assy,ESP and CAP lines F/166'to 1,235'MD.HST 95K,SLK 95K. Test ESP cable every 1,000'.Lost 3 bbl for tour. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative 'Bruce Simonson ENI Drilling Supv. 907-885-0715 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Wade Thomas ENI Rig Clerk Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Troy England ENI HSE Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date LINER 0.03 5,302.00 4/25/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kgflcm') Eq.Mud Weight(g/L) P LeakOff(kgflcm') 2.326.54, 1,248 83 FazePro 1102.4 56.2 1552.8 193.9 Eni E&P Division Well Name: E5 OR loosENI Petroleum Co.Inc. Daily Report Well Code:27982 Field Name:NIKAITCHUQ n Date:5/15/2015 - Report#: 2 API/UW:50-629-23537-00-00 l�II II II page 1 of 1 Wellbore name: SP04-SE5 Well Header Permit/Concession N° Operator ENI Share(%) Well Configuration type SOUTH PASS 46(F.I.) ENI PETROLEUM 100.00 HORIZONTAL Rotary Table Elevation(m) Ground Level(m) Water Depth(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.43 3.99 11.26 Rig Information Contractor Rig Name Rig Type DOYON RIG 15 LAND RIG Job Information Wellbore Job Phase Spud Date Target Depth(mKB) Target Depth(TVD...Depth Dr.(MD)(m) Drilling Hours(hr) Avg ROP(mlhr) DFS(days) SP04-SE5 COMPLETION 43.42 Daily Information End Depth(mKB) End Depth(TVD)(... Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB Temperature(°C) Weather Wind 0.00 107.0 -1.1 Clear INC 25'F E @ 7 MPH Daily summary operation 24h Summary RIH 4.5"12.5#L-80 HYD563 Tubing and Motor Assy,ESP and CAP lines F/1,235'to 6,232'MD.HST 145K,SLK 115K.Test ESP cable every 1,000'.Total 150 Joints 4.5"Tubing.R/D Volant tools and Equip.VD El rig floor as per GBR Rep onsite.M/U Hanger as per Vetco Grey Rep onsite.Prep Penetrator and CAP Line.Install Gator connection on ESP cable.Terminate to Penetrator and test as per Baker Centerlift Rep onsite.Land Hanger @ 6,276'MD,HST 145K,SLK 115K.RILDS test upper and lower Hanger seals as per Vetco Grey Rep onsite to 5,000 PSI for 10 Min.String down ESP and CAP lines from Derrick.UD Tools and Equip from rig floor.N/D BOPE.As per Vetco Grey Rep onsite.Prep and N/U Tree,pull BPV and set 2 way check.Test void to 5,000 PSI for 10 Min.Co Rep witnessed test.Centerlift hooked up ESP cable and test.SIMOPS PJSM W/Co Rep remove ESP and CAP Sheave from Derrick.Press.test Tree 500 PSI low and 5,000 PSI high for 10 Min.all charted W/Co Rep onsite.Remove TWC and secure well.Prep Rockwasher for move.R/D ODS Suitcases and prep for rig move. Operation at 07.00 Rig Move. 24h Forecast Prep and move rig to SI07-SE5. Lithology Shows MAASP(kgflcm2) Mud Weight(g/L) 1126.4 Time Log Start I End Cum Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr. 00:00 09:30 9.50 9.50 COMP K 4 P PJSM RIH 4.5"12.5#L-80 HYD563 Tubing and Motor Assy,ESP and CAP lines F/1,235'to 6,232'MD.HST 145K,SLK 115K.Test ESP cable every 1,000'.Total 150 Joints 4.5"Tubing. 09:30 10:00 0.50 10.00 COMP K 20 P PJSM R/D Volant tools and Equip.UD F/rig floor as per GBR Rep onsite. 10:00 14:00 4.00 14.00'COMP 'C 20 P PJSA.M/U Hanger as per Vetco Grey Rep onsite.Prep Penetrator and CAP Line.Install Gator connection on ESP cable. Terminate to Penetrator and test as per Baker Centerlift Rep onsite.Land Hanger @ 6,276'MD,HST 145K,SLK 115K. RILDS test upper and lower Hanger seals as per Vetco Grey Rep onsite to 5,000 PSI for 10 Min. 14:00 15:00 1.00 15.00 COMP 'K 20 P PJSM String down ESP and CAP lines from Derrick.UD Tools and Equip from rig floor. 15:00 17:30 2.50 17.50'COMP 'C 5 P PJSA N/D BOPE. 17:30 22:00 4.50 22.00 COMP 'C 5 P PJSM As per Vetco Grey Rep onsite.Prep and N/U Tree,pull BPV and set 2 way check.Test void to 5,000 PSI for 10 Mn Co Rep witnessed test.Centerlift hooked up ESP cable and test.SIMOPS PJSM W/Co Rep remove ESP and CAP Sheave from Derrick. 22:00 22:30 0.50 22.50 COMP -C 12 P PJSA Press.test Tree 500 PSI low and 5,000 PSI high for 10 Min.all charted W/Co Rep onsite.Remove TWC and secure well. 22:30 00:00 1.50 24.00'COMP 'A 20 P PJSM Prep Rockwasher for move.R/D ODS Suitcases and prep for rig move. Daily Contacts Position Contact Name Company Title E-mail Office Mobile Eni representative Bruce Simonson ENI 2 Drilling Supv. 907-685-0715 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Wade Thomas ENI Rig Clerk Eni representative Greg Parker ENI Mails Coordinator 907-980-7545 Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Troy England ENI HSE Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.corn 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.corn 907-685-0716 Last Casing seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) Run Date LINER 0.03 5,302.00 4/25/2015 Last Leakoff Test Depth(mKB) TVD(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kgf/cm2) Eq.Mud Weight(gIL) P LeakOff(kgflcm2) 2,326.54 1,248.83 FazePro 1102.4 56.2 1552.8 193.9 m- o x A r W W- M W M N N CO a N a 10 N O m a.- A 0 O W m 0,0N0 •(N0 0 a M 0 0-a W N N MNON(NOON -(NOANMOIOMNW10WWNWVW NON200 WW CO MOW r NCCNO0)00 00000 aaaWW NWMNN aWONN WaOrM OmOant .-NOON 0.0...N0 0O 4qWWWWW 00000 MWOvN Mamr0 ONaWr 0ONOW WONaN O.-M Wm r0 JrrrArA Arrr mmmmmmWm W W W W W 0 0 0 0 0 .. N N N N NO 000(0(0 00(00(0 0(0000 (0(0(00(0 0(00(0(0 0(0000 W 0 W 0 W 0 W W 66666 W W W p W W W 0WWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWW WW OrOO OnOo 000n rrrrrNNNrnrrrr nWrrrr d N rn N rr N . I. or...-.0,o, W 0 A M a 0.0.r. a W A m W a M W 0 A.N. 0 00,00 0 N 0 W W O M N QOoarW MONO.- WW.-MA WNryr ONAmN MOAAV r0vN0 OAAOW VW M.. Wmm0N0WMm VMWNNOWr000.-Om0000nM0AY00 00 OW 0mW C000000MMvvVVOVW00VOVN)0hO0pNNm0rN 00 ) 000 M Y O0 WWWW00 0W O 00000 00000 00000 00000 0000 00000 00000 00000 0 0 J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0 0 0 0 00000 0 0 a 0.666 00000 66666 00000 66666 00000 0 0 0 0 0 0 0 0 0 0 O)0 66 N 0( 0000 M 1-0 a m O .6.-or O M 0 W 0 .m-.. a M v O N (0.-a W W 05.-00, N. C W M M O m a a M N W N . W a 0 W W W M m O v a W W .0 a M A 0 W.V.-0 .OM0W1 a =B66644 4446r 66666 66-66 00000 NN(O a0 MN0,-N NNM 0 a Ma W N N A r r r r r r N A 0000 000O V004.-0 N O W O O )0.00*** a*N M M 10 10 ..... WWWWW ..... WWWWW ..... WWWWW ..... WWWWW .. 0P^aa1-WM WMmW M WOMWO NI-VOM MW W0m NOMWA M WNON NNaar O. C v a a W M v N a A a 0 N W W W W W N W N r °N.-v.. 0 a 0 A 0 00.-0, 0 0.-0 r V.-00V .-0Ma M W YWWWNW0rra0100010000a0ONN0NWaNa0000N (Nb0 .0r0 1)01WN0W N WOO0 .00 . O0000000000000000OVVaWAW NMtN. 0000as ..aVaVVOaNaaWO W . YZ WWWWW WW WWW WWWWW WWW.. WWWWW NWW WWWWW W. WWWWW WWWWW WWWWW WWWmm WWWWW W0m00 WWWWW WWW00 00 WW 0,12<0.100V W W.-W M a N W 000,0 1M a W W a N N W N O W W r W r N N N NO J O O O m 66-.6 .-01,...-W a W W N v.....10 0 0 . ...4. .0 N O O mm O OZ 0000 .-66.-6 66464 6°66.- .O,--N --O W- 46,1.-6 a-N,-6 M 64 EW 0 o m W 22'0V8 0M0 W WOW00 N0 W ra W W m r a a Wp W O m O M A�a 2211.24 OaMW M m 00444 RR77" v0*N0O(N. 0r(0WOWl40A000V00ON W ) 0 0 000710 . . . . . .NNN N N M t7{7 tt T . c- 0.3 C) a) J G 00 = W O O A a O a O M W O A v W.- 'M O W N VW.-4.0 W W v A v O m W A a ,N,.....* O M w g Z x Ooa0r (OMOM OOCNv Mma W 00.0pa AN W WO 00000 .*0100 W N (t4)} _ C000� N[•INOOD MOrOa 'MMtW)W 004)100 )0NN.WON 0....0v WWW hr W W Q d '' N N M M a W W m W A m m O 0 N M a GA j W d J W .,. tt -1..J O E.LO 60 m J Z m y O o W.-a 6.-4-. r 0 a m m r M 0 m W 0(00(00 a N N a W a m a 0 0 N 0 N a W O W d d > > (=00.-m O-(N.O a O N.O N W W A A VV.-MV(N01,000 N NOM W 00007 ON 4 228 d 0$ 0 C W a b 000.-'-' 00.- "'600 a W 00 .1.7- .0 00 W NN NNMM W 34(•)01 ,7„ I� I:OM NNN N U. 6t_o o N d m W O L o O Mar O' W NNta•)V O)0.WOwr r W 100)0 vv.40Y W W 04)000 W M O go o Z 0 0 V 0 000220,m 2 0 U N . No S..o).00A.. a(0'! 2om.. W C 0_W O W Z Q m. o N L L0E0010-2ONn10W M2NO2 rnmWW o210Ng p*ppM M0rNN 22221 NA 4 000. *0000 704 N Y 60066 NN0*0 0000N 1 W 0gia WMW W NNG O MO' NNO O2Nag 00WOa1- Y 04)0 2W L (a/) Q_ r O. o•0 V! d y Y m g, v0 21 c W 0 C d N ! O9g l u IT71 0 W.,5.t." om� rn l:' 34 r; 0. a+ pW c « C V ~ 9W VCCEY LL CO Od UXOV,WNO mh0W.WMNONNOW 00AWm A W10 NON.AN 010 Qms MtG gpl OeW§V W 00477 '1TT'7M N�.C)AC 20222 • 0040 22WAN 24220 000AWN 0W O OWdmOCWyyr0 • . .ANN7YYY Var4Rr I� Q000 O-NNNMM t WW4o0 _« . 77 O• r rg3.. . E.D.1121,02 m ZrC00003 :3arnCvg0 2 T U.. Y d d 0 O d yy d O t 0 0 W>>FF U' �HUrfOf Z(7HJ N O E0M0010 -110 -001. 0YO0MO0O.-Oa0)a.- A0N(0 010 . 0D[ W 0 100 .OMm A 001 0 W L 034.,,,4 6466r 66666 0604 W 1.001-1- cirri.. (O66).1pp 0 00..0 601 • O a N m.0 a O W a M N m A m a M(NO m M O r WNW (0.40.0.- W W O a W N W m 0 MW CO M a a W W 1.1.000 vNN0V W W m r r 0 W 0 0 0 0 N(N M M M a a p W W W NN N NNN N N NNN N NN X.. J U w NLW ON.-.- rOV O A W NM .- Nv W WvwNN2VW yy Mp pp NrO mWmWal 0 .OaO0.-,N, mA^ 0 MMAAO m00-0 A6-00 00006 (NOGAA WH0•010 *VO)000) 200Na0W WoO .00m MNO0 AWM(Nm WN0QM 0A000O • V W O- 11 N NMMaW mrm0O O.-NMM aWOA W0000 NNN MMaa VW NN N NNN N N NNN N NN O LL W CL WSW N N O O C _ OOr0m C. 22422 ONN 242'4 NO.0 '6,4g" 24'".7.03 V'aN' 00 •.. .;,0 OCW.0 f OWAOW 1p)0h . OApppp(pp66 M. 0MW 2MM2MMMN W00WO a40aa Aa.a.a .,.MV6, EMMMM . MhM MMMMMMM 1NMM rd - vn Q W Y MM.W O r d:-0) m .A E N m W"'Y N Oa C COO NaON OO.-m W 0000 N 000`0 V O W N vN W a W Mr Oai N Y 0aD01A�, 14).-0,v W 0)0 J r J^- N a• W 00000 .-.-44,46 1-0000 0(OO)C0( 66.-.6o Mao V *Ya.00. `�4O0 W 0 m W N12om O W `-.2 .7.00020.--- .. .. LL M O O ,sita U d g g N g 0 7 N 0 8 0 0 4) O O O R._Z $aaoa W Qr W 000 E W 2 W W W W W2(M Z Z Z O O 6 p� p E00N00 6466. 000a00Nh MAMA0 W ON.00 OON W O OAOM W 0.00 W 0.00 0.10000.- v W E 3' oo.•.-v .oa of(00 -mo row oa)ro� ���nn 1�Nvoi 4104) nN��� ` o Oq.2 O a N m W N O W a M M 00 W r r W W W a M M N R W N a a W W A 0 0 "M'W 0,000 O N M a W W r m 0 N N a N N NNN N N NNN N M M M M M (Ni 0 d '515 c A C e Y d CD W g. C W e.. N O R Y J 3 «t C W .- C VILA �E IT a E d 2a2��(2, .a o o.2• - b,p 0 3y6 ;o °d o o K c m o c LL'ULL W SO)a W W FUJJUU• > U K 0 a t 40 m N m;40.-01 WM1rMA M01-.0 .-rfrr rtOMNN r �1vm� NN mrpMrVNM �rr0. v �No NVrmM oNmO motN 0.1-NN f.mrN mOmN M. OWrggg 4322m ,,6mt.g. ot . mW 0 a ? WOhmONmNMOOM0 . 4,. 1- YYaYm MN.- NW40 mrMN r04rWto.-Odr Or. d NvMCIO ,WM0.- 4,NV.VI .. to1.V Y ! C.0001MN a-OCOCOV M1-04 J N . MraotOOMMM. MMMMM {p (p40MMM Mp. MhoMMMM4,4,4,! 0 Mmp0o M MMMM 6 0- 10`'10,'10' rr rrr 00010,'10' 1O,'o1rrn rrrrr morn.- AAAAA rrrrr 010,'10'10'0 �o'0irrr IO,1,rrr l0'�0'10_'1nr 10'l0,rrr rrr N V O r 40 O f ,Mn-N-0V .40 d O O W 1-W r t m 6 M N A r W W r 0 0y 1-O 0. .1-W m 6 N m O 1-W N N W r r A.6 W MN-,0004 N m O W N OM. N .0.-.0010 CD .N.00 mt1-O CNOMm Nr V.-A MM W MM V m MrCAO CONN W N MOI MN-I� 0,.-C1.- N W N-mM 011000. 040,030 V OAM O V W CCOOr mmm `^ W O O 0,00,-0 m W 6 r M .N r r M 1-N O m W W,1- M W r 01 m 1-m 1-ot O m 6 1-M M V 40m ,v04.-. n 0N O NV V m NA N N W mW0COMM,. MOA.W VMMWN 6Ofr0 1-AMN. W.NOW MOmm rmrdr O40Cr6 .O O O ` 00000000000 00 0MMMWMM0000t .MMMM . WWrmommmWWN o 0000000W00WWWamw mWWW. aORM.... mmm JWWW WWWWW WWWWW WWW00WWWm. mmmm mmmmm m.... ...m. mt... mmmCOO mmmmm ..WWW atat V 666 WWOtWW 66666 W W W Oi m W W W W W W W W W W 6660;6 WWWWW W W W W. W 01 W W Oi 66666 WWWWW W W M M W 666 aae . . 0 4 1 8 f . f . m f e . . 1 . f 1 . f . . . . t f f f f f f l e d f f f m m . . . . 1 . 1 . f f f t i f f . . . . . . 1 . 01 ' C.0V0, n0,01, ONrOW cram. Omomr ,-mrm� rmmbm N.m,r orr.imm MmrmV rmmrm w.omrr MrmrCOO NON «0 YrmYWMmfOrOfmrmWW400NmAM. VrM O COY NOO0- 0 .66 OYM•` .. � acomm.--o, m.. 0404PM MIDNNNN00 . CON0.0 AMMM MMMMM fff.O ( rrwW MON-01N c.v.., mmmWW WWOOO NMf .66rm WWWWO OotrotN MMf.. 60-. W N N N N N N N N N N N N N N N N M M M M MMM M M MMM M M MMM 1- f f f f f d f d f 1- f V f N.. WWW.. tom 40 m t .mmm. ..... MMMM. ..... 40 40 40.. ..... .m toto t ..... 404040. .40... ..... 404040.m ... CmvWOOVNr NWMNNAY00NWONN . ° pN .WNt000NONQ. MOW4, N.-N.- NOWt. M0 01-W N'-WWW. . . V.0.- 10 4000 MO OM ZRoic4N .-6M. 4OMMm WtMON 601OMot 60mW. need..- H0M.OWNAYONmON6. OWOAOArNWN0-43 ✓`mrm NWO.-w NNMgrTmmmm 1-33V2 oNmmmOi r.- .-m1E12M1- OOMM N,9: MOWWtorC9 ,T,7".Z mmm mmmmm mmmMMMM'^2 24024040 ...mM MMMmM 22222 NmNmm 22222 2'°222 22222 22222 222 W0O 00000 00000 00000 OOOOO 00000 00000 00000 00000 00000 00000 00000 00000 000 m m m 00000 6mmmm 00000 6mmm6 00000 mmmm6 00000 6mmm6 00000 6mmmm 00000 mmmm6 000 J M N r N.M N N M1 W f .4-W00 ,W O A ot O M W ,0.-0. 6 N W 6. N.r.. W.W W M 6 d 1-O m M.r.f W O O A N .0000 '0MN. 01.4400. Nm ot M 6010 NN M W r .0401M0 .fOf m W 4040 toA 046 NdO Oto NN ot m 600.6 Add m OOMMM mmm 006 .-.-664 40 6 1-6 1- .0.0N-NN frrMd d NMM M .-.-..4 1-NMN N Y 1-1-N N M M N N M N M M N M M M 1-h N to.M r M O r o 4003 CmOACmO N r 2NA W O OO a a W ?g=7,P, 22,94f4 vrM vfNO =2'4 r 0 W O N 4 C D N O A 22322 ff00ro.M Mmr-O W MO" N.. M W NrM 666.. mNvifM 67,.-406 W.NO W mNNCDO W r W W m m.Mr. Mm. vi O.pi'6 W f N6.40M M W 4000 OotN iQ tQ fp40m1-N mqx., N 40 01 6'0 rmNOm 40400104. O V 04 N 1-M1 0 VN W r6M N W 404,01 mf 00M�. 40NM Cr Cr t?MM . 1 NNN7� N NMf mm 60-.W O N .MMM V 1-m.).- ..W 0v- �NINNNN Mf f f m op,co4, 00 NN N N N N N NNN N N N M M J 2 NrM.O VM V MAN- f0mm ONC0 (0.- MM... W NmMAMA -N�7A 0(0.00 rWO W r.YAAMMm „ . fCD002.40.0V MN.... 000. NMM ,O W A m1.. N66M066 Myroi p0N01- m rmN meM 'ONM A . WMOttOOWOYNNmOVOmNrm..rMWMp0000 AmMWOr40M OMdmcc0MO0M N7Vm , O 0 0 MOW., r r r 6 6 N.f M M N ot ot 0 0M. N N N NNN N NNNNN N N N M M MMMMM M MMM M mm.toM M MMM M M MMM M N NNN N N NNN N N NNN N N NNN N 04N-r d N J (40 m m O N e0NOW .WWWW 06.Nf am.M. rONWN VN-CON, mmWW. . .1-M V.-NOM .00,.. NNMMM0-, mNW NWo 040.M1r 6,Oot40 MN-ORM, r •-M1 OAMrNOOrmr N-t0WmNOWND C0000. COMM S 0Wm VNWrv Om MNm0 MNarONf mrmM WO N (74,"'s-rt .MO ' 6M1mMOOWW MWONV mMN4 OO NNNm6rrm mWW0 OrN .MMMM MMMMM M1-1-1-d ffto6f 0101..40G.1,-.7,.17.7, Mtjmm m m..ff vv M0V NNr NNNNNNN NNNMM MrMrM MM MMMMM MMMM MMMMM MMMMM MMMM MMMMM MMMMM i w W Q V.040 0 =rNOWm4 L ' .- a . � .- 1 ,- A OdD vO(pt ormiM NNNar rtN. 66.,M <Nvi0t MNatmf O 4.s.-MM oOaMo WMmOiN mWM W.- WMOW. MOCDMM OmmaN Om6fN Wmrm WMr f r OM6WN WN-00M ..rmm m 406r6 m1-COWM NN.-00 OOot NM1-d. mrrmW 00N-NM d1-..r ..WOot NNMMM 1-1-1-d. NmM1.. WOrNM dq1-d. mrrW ONy N N N N NNN N N NNN N M MMM M M MMM M M M M f f f fff f 1-1-1-1-( 1-fff f 1-.... ..... WWW.. 6mmmm m m W V C . W N D+ 0. W=M A r N Y O A N ,W N tO N CMDF CO N V OWI N O m m M N N r N N 0000, 6 M.M r.m M M m M 6 N N 0.,..-4m ..010 6 O M 6 M MOM M ., (O Md...., MOM.W .N r N M d 40.40 M 6 m O r W N M. M O. 1 ODf pirOM0 oiOf tDr rOmMNS f of otOf N W OmM ..6.r cuMNOtco CCINcfl MN W m6fT fp W 6.- c44.46 f(OCC.-v 0-o;N 3 VV. .000, r„0-r 00N- M.dWM rOfa, w..MO rr1N`IW6 OmWOr 4,7. .- c4dVO. VMO., COMMON- NMV f 1 f f , , , , , , 1 f f f f�m. 4001-04 , NNot f Ot CSI Cs1 OQ CSI fit f(0- 014�v vc? N NNM V. r r rrr 0 Y_ z ✓ f7 �V N0NWMN .-VrVV .0.M. .MNVm , p r.RaaN .-WmMMAMAw4 0WA WORN OMMmd M C 0 ,,0 . 0-m W .0f 040W A .-66 NA , W <O0.-MmWM.-064r .-h M M . m O,- r.-.-m.- OW0r6,-,- . W0WO .-N-.-N- N- NMONM 010 .-.904,N NmMWN .WArMW ,- Mf . MY0 DmWW 0WO0 .- mmr .-mmWW 0.-.-NN Mff. .66Ar ,..COM WWWW WWOOO 00000 OOOOO 00000 OOO.ot NNN NNNNN MMMMM MMMMM MMMMM CMMM M MMM M M M 1-1-1- 1-1-f a f '0*01 1-01 '0 '0d 1- VV.*** a fff d 1-01 01 yONNM N.M MOMMNN W m V CONY .M .- .4-, Nmr MNONNmMM004400N- Me.CO. ott AMM WW 0,00A . W . OmOOOMm W o0 m O A N, N 0N46.0c4 ` . W t OON N A N 0* N N 0 0.NN MM.- .t.:6,-.6 m NtAM1. 00 ON-0.-0 mO O 0006.-M .NN tNM 0 NNN. *yaN 0N m .406 rACDmW NOrrN NMMff ..660 Armm. .WWWW WWWWW WWWWW 00000 00000 00000 0000 OOO NNN NNNNN MMMM M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M 01 01 1-1-1- 1-d 1-f f f f f ff f d 1-d 1- d 1-d O eWW1- ^400Wm mOd0 60drM VN-WWW 6rdr 6r.-M1W 7mi,-rNMNaNMOMOamrN-ArommMMOOam2..x400 6.NM WO00 MIM.m N-_ 0r toot0004 rnr00 OICW tr � mNW N 1.. r 0i 0 N M 6.-6 N C r c N MON f oi M ot A Wc4...-4 t A m r OD O O M M wiW O Cl . O W N a N r tu ot ri o 0 4,0 W M O.N O O MM rNMdf ..m66 6mrrM1 cow... WWWW. OOOO 00otot NN NNNM MMMf1- MMMNM MMM E C�NO M rcm OO0.-WN.- MN W<r M040OM NA N W. 001.-.. O NN- NN-0-N-MMA ,e W NW 000- m . r0- O . .N-N 1.- m COM 6N-. W W.. MNN M .COM .. . Mm$ r „rrr rrrMmmw Norma, mmm �mwm mooW. m.. .. .. ..6N MrrrmmmcomwmmWWW • 2= NM ...-.-e ONW MA,-n r.-.mM00,400. NO<O NO1-N 0-0MMN- OOONMOM WN. e. m76N MMVO tOVCOm AO . WCC�OMrCDr4,. D , rm. ONNO1OM mtmW'OWMpmN- CO. VMver00OWN , 60QNMO .- WCrrm. wm- mcv WNNfrO0M.QVfe4M0010 MMD .040MN 0 m. MMYOV<VO OVV. N. .. ...CO000MNd00, f .Arr , rAr , A0 .M . d V . . ....CO 00 . 0000AA „ A..., 00WW COW N Nr N DD N 8 1 c V i=1-. m 0 0 M V:M0 OOMDYO�� h Wh0� (4.004.. N�Wr0myy N V 0 4 W 0Mppr M� pp ^wnMNV 1. p Mp WA7 0[ M0104 . Om00 NMN W Na0OOD04.-NO ."N 040 � pp0NN N3Op 00 0O WmW Wnwm ,00V -3C902p2M3 00000 OQQm mmaW I- r r-www comma,. , 333p�QYmm 22m0.0 0000 000WW mmmmm 0000. 00000 00000 00000 00000 00000 0� 2 m00000000000000000000 00000m000000.0000m00mmmmm mmmmmmmmmm m mmm m al0 .000 66 66666 CGCCG 66666 CGGGC C CCC C C CCG C C GCC C C C G G C G CCG C C CCC C C CCC C 66666 OOOO rr nnnnn rnrrr, nnnnn ,AAAA AAnAr nrrrr ANNA, AAANN ,AAAA NN,AN AAAnn nnnnn nnnr ry V 0^o0 0 0 0^w 00(00)0 W N N Y N 0,... 0^^0W m(44400 r r 0 w m 00.010 0)00)))))) 000)0(00)vc wn M 004w0p11 w 0 0 wOf n O ,- MO0)hN0V ,-0NnrON ^.NOM � O ONrHOppnmnMVWyOr WOstMNON p00ON OOrrNNM NOWON WONO 0NNO40•-00M�OfW AM,�NWNWwWrpNpMw04Nn WOMNO 0WW01 O7 000020 OOW0YY OwwWr rWW00 ^1,00N,- WrWWm mV MMN 000 WmAOWmmQ MM wmmA p rr 000 00000 00000 SSW.. OmmmmO00a aa� ♦ .0mmm0000 mm WWWqW 0.000 WWW00 WWW000.00:! 00 . 0000 DD0.000 pn0066* 66666 666606666 6006 00600 00 *10010 of660* 000*pi mmmm YY YYYYYYYYYYYYYY6 YYYfQ QY6YY YYYYY66Y6YYY000QQYYQYQYQY NN Y Y Y Y Y Y Y Y Y Y Y Y Y Y N 111 . 1 eools 11 . 11 set . . illoo isill 10111 11 . 1i 11 . 81 „ „ 1 11 . 1 01=40N 0),V 00,000 nW ON04-4.0 .NMM1Owwr w ,,MN. �MYWw �nr0� •-(000. 1Yn�MW. ONW NON,, OYm.(. mMi7WQhp NoImrcnm 66464 -6r:66 m � W ppr 0 01,4 -01 NrOM 0 o rN01YNAAY N , . 0p0Nm00 p`WO 00,-NM rW000 NMMQ 0,00^N NMYmm 0nW00 0,-.-Nm WE YY ...WO WOWWW MOW WWrnr nrrrr, AAAA, mmmmm WWmmw mmmmm wwwww wwww mm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmm • 0^^N W N 0 W r N M W 0 0 0 W r N 0 m 0 Y N N N Q M^ N.-0 0^ 0.000 w 0 M 0 0 w 0 Q^0 w 0 N W A n M NO w .4,-N.- M w^m w a n O O m n M 0 01 Y m M 4-404r, WY Q 0 vA O M 0 N r moi-mo 0)0)000 N Y 0 M m O W 0O 0 L�0W ONOYw .OMVn,N0 ^10nA� O 0 �MWWNA N0DOW010m • 0NO . 0 00 WoVV.MNN M7A r0000 aMM, ^B0ON0of 7MNN WnNOW NWOmm YYMMN m $mNn WWW.* MmNN^ • 0)0 .m m m m 4,044-4 Y Y Y Y Y Y Y Y Y Q f MMM M M MMM M M MMM M M MMM N N N N N N N N N N N N N N N N N N N^ 00 mmmmm Wmmm mmmmm mmmmm mmmmm mmmmm Wmmm 00 00000 00000 0000m 00000 00000 00000 00000 00000 00000 00000 00000 00000 0000 W W 00000 00000 00000 00000 0.00). WmWWW WW W W W 00.00 00000 WOW. 0.00. WWWWW 0000 W0W W J00 • O00ONOMO WNNM0rn AWpONNNAMNNW ^ 0MM 00NN0-00r DNDN0 01 WmM0^ 1" ,"4.!,7‘1 001 0 o0N NNNNO ^^000 • ^^^^^ N^O^^ O N^O^ O O^^ 3 x00 0^M Wr 0N.0O WW :MN," wN W ,001,0 wm m W 044.4000 N NA NOr,mm OnNr W00OM0D 0^4n7A0010MNO m7017 WWMO Q Mr mW YNO nN00 6,-660 ^ 40) 66 .0YiCV C mmOYA 00001 l7 00001 CO 0)N•- totor, 0000O1*MN01041* 0W0)NW 00000 ONNO0NWOO0000 ,0000010^ 00)00.40,4•-00 MONA, 0 MM 00MMM MMMY 0 Q0 Q YY0Y W0W WWWWr rnrrr 0rWW • J w Z0)Y WOW., O�mr00 N0.0 MQON v-W O YN Mp .004'NIM7 lW7VW wNmWMWmMra Wr 10000!..C4 OW. W00,00WO.MW0101tM W,OQM M7Omn I7V 40 *YWNA N^Om WY0 606** M0)MMM ,Nw- NN^WO NWNwW MOmOm wNYmAOMmWr *N.AMO M, 01N ^ N001NmWYNW^ W^qw0 OON 0nNNhq N4( nQTO ^^ ^^ WN 11081 11111 1181 J WW E'Xw 01000000^ wnNMO aOYOM 'm 0010.00 OM,IDN Mwm ON Q e�N WW {W71QpNNN ewDOOn o QQ,mm,0 m aMONQm OIW�,IApN N MN 000,Wm. N p ^r 66666 n^000 0 n W Y^ 66,:66 0000 N 10 0 0) 64660 09000(09 66666 0 0 6 06M W O 0 N 0 O D A O N 0)0 p 010 QONm QwmNm 0)NW001 OnYNW A ,nn NMMYV 0Www0^ NN7Y mm00 0Wm a NN0MM 0YYYY ^1-44-0-4 00 OmoW 0 IA W r ^ Cl) _ A AOYDmN01wO0Om01nOQpONNWNO' N00ppWNrMNNNmWN m4 WNmWY MO D0M ONr 00p0) ODw ANnAN O7 • W MGQMG 06666 0W , rMNr rm NN00 W.Wfl " OCWNA MN,-,-O W0,Wnn W..4 0 MNWw0nn W w0^NM NN0 0Y00r Ww0 N NMY0W 000 .- fV WN NNWA. WW r„nN m0Ommmm mmw0w w01wwOI00000 OOOO0 0 ^VV NNN NNNNi • C W N Uw 0.... QOw 0.0 106*^0N W WO W NM pp0000NNW WM OWN 0, �:MNOnOwn0 ANO p a �M4 00. CONWOM W, 010 m0 000 7m,ON0 WO : *IVN*N WON6* AnMNp0 O 40 000 ^0 MOWrr W00 YM MN".•-0 0(m M 010 O OM., MN Od W 01 0^ N M Y 0 0,0000 NMY m ..A.01 O^N.44. m m A m w 0,0e-0101 Y m W A m 0 0^N M Ma 0 0 0 WOO.-O^N M Y N W ^ ^^^N N N N N N N N N N N M M MMM M M M M. O f Q Q Y Y Y f f Y 0 0 0 0 0 m m m m m W W W W W b W W W WW,,, Y i Wa Z ^000 ('10)0010 NO ^O*NM 00 NN W O M W 00 M 04'4'030 00000 W O Nr NM w 041,47400 00000 W 0i WOO. ON 0000 N0M0,-* N V 0 W n WNW W N* N0M0 **YN^ 600)00 0010100) ^.0000 GN0n 66001* 0i M**C 00)000 00000 C*1*1 000)00000 401664 aaoi.- N M M M Y Y Y Y Y Y Y Y MMM M M MMM M M MMM M M M Y M M M Y Y Y m m m m m m W m W m W 0 0 0 0 0 000)00000 0000)) 000)0)0 Y Y 0 Y Q 0 0 Y Y Y Y f Y Q Y Q f '44-4^1-W 0 0 0 0 0 *0 0 0 0 0 0 0 0 0 Q Q 0 0 Q Q Q Q Q Q 0 0 0 0 0 Y Q Q Y Y 0 0 0 0 0 Q Y Y Y w Z M0 W W N O M m f N m m^ M^^ O Y Q CO CO W Q N^^ w Q M VO 000”-N n A w f N W W Y O N m^Q^m M Y M A NMOM 0 m ^m Y0 W r Y M 0 w N N M Y M N r 0^ f O W W Y N O w 0^ M W M Y O 0.700 n A N Y W r 0 W N N^w M 0 N w W .M O O G OY *CMN� COw*r nnMNM 46WMM MWNfn 100160Mean100 mMNWWnrWWAmmW^ wwwWW WWWWm WWrrA WWWWW WWww01 wwww01 wwwww 0lr00 nW „ yE V V 00000 Q V Y Y00000 Y Y O Y00000 O Y Y O00000 V Y Y Y00000 Y OY O00000 Y O Y Y00000 1 O Y Y00000 Y O O Y00000 00000 00000 O O Y Y YmO Y101Y OI0 0000 Y(p O Y 4 - O0000400V000W 00N WW.ff �O� NNNNWpp,nNWNm 74 ONONO W004^f F NNCWrM 6O ** hWNWN 060001 00) NY ,-600, rmWNm vYMYM MNW0:M A*Mh NNNNN NNNNN NNNNN mNNN 04 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Y^f^ M NOM M .0-0. W m W^m 0 W^N N 4,004M0 Y 0M O •-..-01,T m^M Y 40.-0^1,4 00.4.0. ^ N.O. W0W 00W00 0YN0Y0Y0W ON ^NWe0 W0000 N^700W0010 00000 00nMW 66 66 66 66 00000 wOnww 001000 wNWW WOQww 00^010 0000 QQwww 000 mm mmmmm wwww wwwww wwwww WwWmW mmmmm comma", mmmmm wwwww wwwww wwwww mmmmm wwww YN W MOS N W QrN ...NO OMn Oh 00.00, 4.0104r,IW�,NwOof NW 0400,0 V 00 NW W IW7,�N W 4'01'4.0 W 000 W N r0Nn0 N W 001 co O M W OMn O Yr OY n -Yn^Y n^Y0^ f W^010160^101 0^0 -00004)00 Nm ON0 0 N060N 0000))0 NOON O O w w W n W m m f M M N^ ^O w w m r A WW m m Y M M N^ ^O 0)•w W A A W 0 m Q M M N^ ^O w w W n n W m m a M M N^ O Q1 w r W 0,00•-N 0 0 0 n Mm 0 •-04M4'. N M Y 0 0 n 0 w 0 N 0 M 0 m 0 n 0 w 0,-040,4 m 0 0 A c WW Www00 0www 00000 00000 04^'^ NNNNN NNNNM MMMMM MMMMM YYYY Y Y Y Y nj 0 10 a0 Ny U_ 8ICC 0 0 a 0 e Y ��pp {p rrpp e W• 0r,-. . nn�p0 Yl NNNQ F0AA OTon tW4me0 W :,-Z0 EZ! a N M W In r 0M0M 8'‘1g2;:.:-o Oy O N0SOO N m'6m.1n M_GnOO �[OIQ2N2 ;��h0) :TI N ` J 0 000no 00000 NO Yj 0 00000 0000 00000 0000 00000 000 d yyy r nnnpprr nrnrr rrrrcCnp� �n mmn rr nrprnr rrr O q. O 22AF N0MA Z�EYNO N YW1Q�0AE OOCAcpp HONE pNo< 00 iC CD NA—W S AO empImp pp_2A 0 Z 2g W men M 0) SEE C 0 00000 e0N]M00 00000 EWA 000�Ory4M 'OAR N 0 0 0 0 0 6 0)0 0 0)0 6 0 0 0 0 0 0 0 0 0 0 0 0 f0 0 00 W 66666 • O v Q 0 V O Y OO 6666. Y<O vO a Y66.V f O v000 OC C 1000i0NM Z 0 MON O0NNoNmNm0NrN0 A0ANm 0 W MfppO0 S Eg y NrOgNWWAMM 7-ASPOO82 W B80 ,Z Nm ) ONM ehr2 mm N GOLW,N 0TR 000N NNN NN0N000 C 0A0000 20n00OPM277. g07NN 00NAA AA4 .. 'm M “ 0NApgig OMOA4 NNNN N NNNNN NN Ni22n On0p0 02p • 28822 28222 28882 38835 22222 222 j M 0..-- 07011 - n cO n T 02060 O fO -O , ... 6.- -6.- -6,= . eV0OG ov6.- O OCA 0 �' 00000 U)U) • 0, W W W W W W W p 9N0.)V u,,T9 3 OO pp �epp �0 a}{p pp 0 BNNNNaa W COM rNmNO MANMO Of,Mm� em0 V.n0 4202$ N�oM 8 W W W W'J J 0 (0yo0NN oCpoo_r ZWWtpppON((OP4 naNNO W OCMD W 0)O e,N e NO aN W W W E 005I W 01000 mm m0)O+W W 0)d,W W W A W W W O EEO 0 000000 m Saaa$ S 0 0 co 0 %0an J p p m p o 0 2,r',2 tO.M-OD Ml�1 OemAN tN4 MrZ 100 Am00 m 02 V 2yO'1 POv W X 5 T W W 0C4 n Oi00N 0 W MIA .. .:4,44 N�tO ^0)N Ao O 0) ap 0 .-6NnN nNOMW NOp O W T O O N N N M 0 0 NNNN N N N M M N J C e Q a. NNNN NNNNN NNNNN NN c�t�) MMM (�(�(�LL'(�Z � ^<' d S. 201§S'Yw m N N uNi N o O(0 U�•U'Z - w J M Nm 6 6 W mom.-0)v) r0 m N�nC Iprpg n 0gg3�'3 w o N KV0 2N pN pP O �S0E V e OOm7 m�ONpM mmm t2�"p Cm AA4 m�Op pO 2 m 2 2 0 g J Ate- (n 4 A'' NNSm r 6NMpNN e7M�p V)r1e00 OmfilI ONm N6 ti c1I t comm all y0 mm O U m .000. 000)AW WWO1WW Am300 OOONO 000 rn y,7AyN Y 0 m Y �. O pp cp ��pp pp p y y o _- T t'I�VNN 20000 t00Mm0 P)OOORh ESAA0 TOlrf 8 .00NNpj00 Li"? < $ < m� ISE;* 0) Cp 0n�4 ro oi0. 22,60i,666 1111�nm6 m O M AAT;G ♦W N fin cO If)N Qc7 MN O Ap0�1 p�r m<O<VrV IN l7 W W NNN ��m DD y D 0- g N O NM4 AMM cW000 a a !OO f< 0000100 In Yi 10 ' �QN< L C 0 MMMMM a e'si m o u Qe C I' = 555 3 V \ N u �2" "—'n- AS'AS E" gg'r "SASS 228 Z g %� c.• O 0 6 0),.6 N,.N0 NfN4ci W O O)OfV A W NNaD.-l4 NtOM 4-��N N,mitric4cvoi00 fffiT O L 1� • C Vspr ::-.008EmOmAmm Ammgm mmo`2'iX8 le 2A8&8 000m 2y m Ile 4Wer0)WN 2� oOMMmm6mNo0a —' � E:(§ oBT\� -rn c4 ,orymm aeecm 2026m0 evma+a InWM�o omDa� _ �'�c�s�� C � pc�UV Melt'�I(7A MQQO< eO<l")M 0)NNNN Nm�'7 000 LL 0(nin(n000 m N X3 \e 0eeve 00000 venev 40040 04000 004 0 aaaaac< ppm n ao7oZg {`�. 0 _ r e 0 Sf W N MO SMO o0 N t�0)N WW 006 0 8pq 0010pt0p appOpp LL' t Y E N O 1S 0 - r-O :.,,',%72 ,WO) Y)Tr W n 1102 R W 200 mO!�eO� 0�[0 T A 0)5000 ec ?m mmco$m OOOOO $ogoe vSaoo oao ' oremoo a0g`4r4) 3 g' 1=1 ;��+�0+ coo voo22e 0000000 Dee a 000 00044 y 7 a > s x DD P.26-,9.2g P.' RR osn N$222 'NN0o2 .,2%m. U E Hm§ O m T 6.6.664 eco tO N N N N NNN 0 v-00 .K KFN NNNNN NNNNN NNNNN NNN NNN NNN 0 GM00000EZZ G 2 p Dn�r di m 0^ O 0 W.I N m m W LL YY ��pp p AS, cop N La W fn I O l° a n�er�)OOG eWOhn Ne0'i tOMhO ODN2O0 mSmN� e'W)mm O g ' eco•) m 31111 m gc74 Ammmm ggzraym arn$$rn m}n"S&'$ $mm t a .-,os•n 0 0LL11co. re V'< m pf ep cp p 0 e m' 0 g'�r gNmO< 1108611 mOVl�m 2802'3 T4222 220 ;6g 0 zoo N W N 6 W wo N gg neN!I�!I�QQj O�ppI1O 020700 NNN 2 m em eSNNh g2A2 22261000 tSclo2A 122.10 00A a N N 2 m $ ° o C e W a ar c o• 0 0)O) 0 HALLIBURTON eni Eno Petirolleiuiirn Sperry t�ri!ling PACKING LIST Spy Island Drillsite Nlkaitchuq:SPU4-SES&U. Shipping Date: 6-May-2015 Spy Island,Alaska 4 f l', ENI Petroleum AOGCC C/O Sperry Drilling Alaska 333 West 7th Avenue; Suite 100 6900 Arctic Blvd. Anchorage,AK 99501 Anchorage,AK 99515 Attn: Meridith Guhl 907-793-1235 SP04-SE5 Washed and Dried Samples-50' 3350'-6500' Paper envelopes 1 of 8 Washed and Dried Samples-50' '�i14 6550'-8700' Paper envelopes 2 of 8 Washed and Dried Samples-50' \b-% 8750'-11550' Paper envelopes 3 of 8 Washed and Dried Samples-50' 11600'-14550' Paper envelopes 4 of 8 Washed and Dried Samples-50' 14600'-17418' Paper envelopes 5 of 8 Washed and Dried Samples-50' 7450'-10900' Paper envelopes" - 6 of 8 p p Washed and Dried Samples-50' 10950' 14350' Paper envelopes 7 of 8 L-..Jr- Washed and Dried Samples-50' 14400'-17420' Paper envelopes 8 of 8 One(1)Bundle Contains Bundle 1-Eight(8)Boxes Notes: Total Packages this Shipment: 1 Please notify sender upon receipt of delivery; Josh Zuber 907-223-6659 RECEIVED Received by Expediter: S' Q ) Date: MAY 1 9 2015 AOGCC 1., OF 7w �w\�11/7r.sv THE STATE Alaska Oil and Gas - �, ofALASI�:A Conservation Commission 333 West Seventh Avenue OF �*h„� GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS" Fax: 907.276.7542 www.aogcc.alaska.gov Davide Simeone Well Ops Project Manager ENI US Operating Co. Inc. 3800 Centerpoint Drive, Suite 300 Anchorage, AK 99503 Re: Nikaitchuq Field, Schrader Bluff Oil Pool, SP04-SE5 L1 ENI US Operating Co. Inc. Permit No: 215-049 Surface Location: 4486' FSL, 1195' FEL, SEC. 19, T14N, R9E, UM Bottomhole Location: 1237' FSL, 1544' FEL, SEC. 21, T14N, R9E, UM Dear Mr. Simeone: Enclosed is the approved application for permit to re-drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 215-037, API No. 50-629- 23537-60-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 1/6( 1-<41-t---N 1 Cathy P. Foerster Chair DATED this day of March, 2015. ' IVED STATE OF ALASKA .: a 0 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL ,AOGrf 20 AAC 25.005 la.Type of Work: 1b. Proposed Well Class: Development-Oil 2, Service- Winj ❑ Single Zone E , 1c.Specify if well is proposed for: Drill ❑ •Lateral ❑., Stratigraphic Test ❑ Development-Gas❑ Service-Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Redrill❑ Reentry ❑ Exploratory ❑ Service- WAG ❑ Service-Disp ❑ Geothermal ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: Blanket E. Single Well ❑ 11.Well Name and Number: ENI US Operating Co. Inc.• Bond No. RLB0008627 • SP04-SE5 L1 , 3.Address: 6.Proposed Depth: 12. Field/Pool(s): 3800 Centerpoint Drive Suite 300,Anchorage 99503 MD: 17377 ` TVD: 4134 • Nikaitchuq/Schrader Bluff • 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: 4486 FSL, 1195 FEL,S19 T14N R9E UM . ADL 0391283,0388583,0388582 Top of Productive Horizon: 8. Land Use Permit: 13.Approximate Spud Date: 1715 FSL,4164 FEL,S17 T14N R9E UM ADL 417493 5/8/2015 Total Depth: 9.Acres in Property: 14. Distance to Nearest Property: 1237 FSL, 1544 FEL,S21 T14N R9E UM , 6954 1544'to unit boundary 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: . 54.1 ft 15. Distance to Nearest Well Open Surface:x- 511715 y- 6053666 Zone- 4 GL Elevation above MSL: ' 13.1 ft to Same Pool: 200'to SP08-N7 16.Deviated wells: Kickoff depth: .'•- 30U feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: - 94.14 degrees Downhole: 1836 psig Surface: 1387 psig 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) Driven 20" _ 178.89 X-65 Welded 124 36 36 160 160 Pre-Installed 16" 13-3/8" 68 L-80 BTC 3143 35 35 3178 2454 In place/Completed 12.25" 9-5/8" 40 L-80 Hydril 563 7083 33 33 7116 4056 In place/Completed 8-3/4" 5-1/2" 15.5 L-80 Hydril 521 10461 6916 4042 17377 4134 Sidetrack-Liner in open hole :3 c at i7ti t' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect. Depth TVD(ft): Junk(measured): 22951 3476 Casing Length Size Cement Volume MD TVD Conductor/Structural 160.00 20" 160.00 160.00 Surface 3,143.00 13 3/8" Surface Lead:2639 c.f. 3,178.00 2,454.00 12.5ppg Tail:354 c.f. Intermediate 7,376.00 9 5/8" 12.5ppg DeepCrete:803 c.f. 7,409.00 4,077.00 15.8ppq Tail:269 c.f. Production Liner 10,188.00 5 1/2" Liner/Open Hole 17,398.00 4,153.00 Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat ❑✓ BOP Sketch 0 Drilling Program ❑✓ Time v.Depth Plot ❑ Shallow Hazard Analysis❑✓ Diverter Sketch ❑✓ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 3/6/2015 22. I hereby certify that the foregoing is true and correct. Contact Andrea Lazzari 907865-3323 Email andrea.lazzari@aenipetroleum.com Printed Name Davide Simeone Title Well Ops Project Manager Signature V Phone 907 865-3320 Date 3/6/2015 '41 Commission Use Only Permit to Drill , 01-19 API Number: Permit Approval �7 1 1_6 See cover letter for other Number: oC)_- 50- ,9 -23 3Z.-(0D -O Date: 5 a_) Il requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane gas hydrates,or gas contained in shales: ❑ Other: gb C / Samples req'd: Yes ❑ No Mud log req'd:Yes❑ No❑ 43-S00 rSL H2S measures: Yes Ill No 27 Directional svy req'd:Yes RI/No )I Spacing exception req'd: Yes ❑ No[✓( Inclination-only svy req'd:Yes❑ NoL I) APPROVED BY 2 - 2 _/� Approved by. COMMISSIONER THE COMMISSION Date: J J ite 1 r 1... �u�.i o.m 2,44 Form 10-401 ( evis . 10/2012) This permit is valid for 24 r 1 f r val(20 AAC 25.005(g)) Attachments in Duplicate 3-1g-1) -i 311105 2n P/491ietirdleLI 3800 Centerpoint Drive Suite 300 Anchorage,Alaska 99503 Davide Simeone Phone(907)865-3320 Email: davide.simeone@enipetroleum.com March 6,2015 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue,Suite 100 Anchorage,Alaska 99501 RE: Application for Permit to Drill Producer SP04-SE5 Ll Dear Commissioners, Eni US Operating Co. Inc. hereby applies for a Permit to Drill (Sidetrack Existing SP04-SE5) for the Offshore Producer well SP04-SE5.This well will be drilled/sidetracked and completed using the rig Doyon 15. / The planned spud date could be as early as 05/08/2015. Please find attached for the review of the Commission forms 10-401,the information required by 20 ACC 25.005. If you have any questions or require further information,please contact Andrea Laz�i at 907 865 3323 Sincerely, Davide Simeo e W lOps Puuj: 6oi.na:erg0. EiniiiPetirolleLuim nn Application for Permit to Drill SP04-SE5 L1 Saved:6-Mar-15 Application for Permit to Drill Document Producer Well SP04-SE5 L1 Table of Contents 1. Well Name 3 Requirements of 20AAC25.005(0 3 2. Location Summary 3 Requirements of 20AAC25.005(c)(2) 3 P/ease see Attachment 7:Surface Platt 3 Requirements of 20 AAC 25.050(b) 3 3. Blowout Prevention Equipment Information 4 Requirements of 20AAC25005(c)(3) 4 4. Drilling Hazards Information 4 Requirements of 20AAC25.005(c)(4) 4 5. Procedure for Conducting Formation Integrity Tests 4 Requirements of 20AAC25.005(c)(5) 4 6. Casing and Cementing Program 5 Requirements of 20 AAC 25.005(c)(6) 5 7. Diverter System Information 5 Requirements of 20 AAC25.005(c)(7) 5 8. Drilling Fluid Program 6 Requirements of 20 MC 25.005(c)(8) 6 Lateral Mud Program 6 (MI FazePro Mineral Oil Base) 6 9. Abnormally Pressured Formation Information 6 Requirements of 20AAC25.005(c)(9) 6 10. Seismic Analysis 6 Requirements of 20 MC 25.005(c)(10) 6 11. Seabed Condition Analysis 6 AOGCC PERMIT Document Page 1 of 7 Printed:6-Mar-15 • Enil PetiroIktuim eno Application for Permit to Drill SP04-SE5 L1 Saved:6-Mar-15 Requirements of 20AAC25.005(c)(11) 6 12. Evidence of Bonding 6 Requirements of 20 MC 25.005(c)(12) 6 13. Proposed Drilling Program 7 Requirements of 20 MC 25.005(c)(13) 7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal 7 Requirements of 20 MC 25.005(c)(14) 7 15. Attachments 7 Attachment 1 Drilling Procedure 7 Attachment 2 Directional Plan 7 Attachment 3 Drilling Hazards Summary 7 Attachment 4 BOP and Diverter Configuration 7 Attachment 6 Formation Integrity And Leak Off Test Procedure 7 Attachment 7 Surface Platt 7 AOGCC PERMIT Document Page 2 of 7 Printed:6-Mar-15 PtIroIkLuIIr1 Clnli enn Application for Permit to Drill SP04-SE5 L1 Saved:6-Mar-15 1. Well Name Requirements of 20 AAC 25.005(i Lad,well must be idenGned by a unique name designated by the operator and a unique API number assigned by the commission under 20 AAC25.040(6).For a well with multiple well branches,each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. Well Name: SP04-SE5 Ll 2. Location Summary Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (2)a p/at identifying the property and the property's owners and showing (A)the coordinates of the proposed location of die well at die surface,at the top of each objective formation,and at total depth, referenced to governmental section lines. (B)the coordinates of the proposed location of the well at the surface,referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration; (C)the proposed depth of the well at the top of each objective formation and at total depth; Location at Surface 4486 FSL, 1195 FEL, S19 T14N R9E UM ASP Zone 4 NAD 27 Coordinates RKB Elevation 54.1'AMSL Northing: 6,053,666' Easting:511,715' Pad Elevation 13.1'AMSL Location at Top of Productive Interval 1715 FSL, 4164 FEL, S17 T14N R9E UM ("OA"Sand) ASP Zone 4 NAD 27 Coordinates Measured Depth, RKB: 7,578' Northing: 6,056,179' Easting: 514,012' Total Vertical Depth, RKB: 4,071' Total Vertical Depth, SS: 4,017' Location at Total Depth 1237 FSL, 1544 FEL, S21 T14N R9E UM ASP Zone 4 NAD 27 Coordinates Measured Depth, RKB: 17,377' Northing: 6,050,442' Easting: 521,942' Total Vertical Depth, RKB: 4,134' Total Vertical Depth, SS. 4,080' Please see Attachment 7. Surface Platt (D)other information required by 20 AAC 25.050(6); Requirements of 20 AAC 25.050(b) If a well is to be intentionally deviated, the application for a Permit to Drill(Form 10-401)must (1)include a p/at,drawn to a suitable scale,showing the path of the proposed wellbore,including all adjacent wellbores within 200 feet of any portion of the proposed well. Please see Attachment 2: Directional Plan and (2)for all wells within 200 feet of the proposed wellbore (A)list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished a copy of the application by certified mail;or (B)stale that the applicant is the only affected owner, The Applicant is the only affected owner. AOGCC PERMIT Document Page 3 of 7 Printed:6-Mar-15 Iff* • Enli conn Application for Permit to Drill SP04-SE5 L1 Saved:6-Mar-15 3. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) An appl/cation for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (3)a diagram and description of the blowout prevention equipment(BOPE)as required by 20 AAC 25.035,20 AAC 25.036,or 20 AAC25.037,as applicable; Please see Attachment 4: BOP and Diverter Configuration 4. Drilling Hazards Information Requirements of 20 MC 25.005(c)(4) An application for a Permit to Di,,,must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (4)information on drilling hazards,including (A)the maximum downhole pressure that may be encountered,criteria used to determine it,and maximum potential surface pressure based on a methane gradient; The expected reservoir pressure in the Schrader Bluff sand is 0.45 psi/ft, or 8.6 ppg EMW (equivalent mud weight). The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methane gradient (0.11), and the planned vertical depth of the OA sand formation is: MPSP = (4,080' TVDss)(0.45 - 0.11 psi/ft) = 1387 psi ✓ (8)data on potential gas zones; The well bore is not expected to penetrate any gas zones. and (C)data concerning potential causes of hole problems such as abnormally geo pressured strata,lost circulation zones,and zones that have a propensity for differential sticking; Please see Attachment 2: Drilling Hazards Summary. 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 MC 25.005(c)(5) An application for a Permit to Dm must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (5)a description of the procedure for conducting formation integrity tests,as required under 20 AAC 25.030(0; Please see Attachment 6: Formation Integrity And Leak Off Test Procedure AOGCC PERMIT Document Page 4 of 7 Printed:6-Mar-15 2ncif* • Enli Ptir©IIuim Application for Permit to Drill SP04-SE5 L1 Saved:6-Mar-15 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application toi a Permit to Diiii must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (6)a complete proposed casing and cementing program as required by 20 AAC25.030,and a description of any slotted liner,pre- perforated liner,or screen to be installed; Casing and Cementing Program See also Attachment 4: Cement Summary Hole Top Btm Csg/Tbg Size Weight Length MD/TVD MD/TVD OD(in) (in) (lb/ft) Grade Connection (ft) (ft) (ft) Cement Program 20 Driven 178.89 X-65 Welded 124 36 / 36 160'/ 160' Pre-Installed 13-3/8 16 68 L-80 BTC 3143' 35 / 35 3178'/ 2454' In place/Completed • 9-5/8 12-1/4 40 L-80 Hydril 563 7083' 33 / 33 7116'/ 4056' In place/Completed 8-3/4"OA 5-1/2 Sand 15.5 L-80 Hydril 521 10461' 6916'/ 4042' 17377'/ 4134' Liner in Open Hole-no cement Lateral 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Dail must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (7)a diagram and description of the diverter system as required by 20 AAC 25.035,unless this requirement is waived by the commission under 20 AAC 25.035(h)(2); Please see Attachment 4: BOP and Diverter Configuration. AOGCC PERMIT Document Page 5 of 7 Printed:6-Mar-15 trAEiriii PtIr©IkLulm• e 11 Application for Permit to Drill SP04-SE5 L1 Saved:6-Mar-15 8. Drilling Fluid Program Requirements of 20 MC 25.005(c)(8) an appucauon roi a i-ermit to um must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (8)a drilling fluid program,including a diagram and description of the drilling fluid system,as required by 20 AAC25.033• Drilling will be done with muds having the following properties over the listed intervals: HTHP Fluid loss (ml/30 min <5.0 Lateral Mud Program 200psi&100°F (MI FazePro Mineral Oil Base) Oil/Water 60 / 40 Value Ratio Density(ppg) 8.7-9.4 ' - Electrical >600 Plastic Viscostiy 15 - 25 Stability (CP) Yield Point 15 20 (lb/100 s) Drilling fluid practices will be in accordance with appropriate regulations stated in 20 MC 25.033. 9. Abnormally Pressured Formation Information Requirements of 20 MC 25.005(c)(9) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (9)for an exploratory or stratigraphic test well,a tabulation setting out the depths of predicted abnormally geo-pressured strata as required by 20 AAC25.033(f); Not applicable: Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20 MC 25.005(c)(10) An application ror a Permit to Dull must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (10)for an exploratory or stratigraphic test well,a seismic refraction or reflection analysis as required by 20 AAC25.061(a); Not applicable: Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis Requirements of 20 MC 25.005(c)(11) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (11)for a well drilled from an offshore platform,mobile bottom-founded structure,jack-up rig, or floating drilling vessel,an analysis of seabed conditions as required by 20 AAC25.061(6); Not applicable: Application is not for an offshore well. 12. Evidence of Bonding Requirements of 20 MC 25.005(c)(12) Au appi cation tui a Pernm to Dim must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (12)evidence showing that the requirements of 20 AAC 25.025(Bonding)have been met; Evidence of bonding for ENI is on file with the Commission. AOGCC PERMIT Document Page 6 of 7 Printed:6-Mar-15 E,r '1* PtiroIIuim 2no Application for Permit to Drill SP04-SE5 L1 Saved:6-Mar-15 13. Proposed Drilling Program Requirements of 20 AAC 25.005(c)(13) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: Please refer also to Attachment 1 — Drilling Procedure 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 MC 25.005(c)(14) v'.appncauon ror a rernrt to urui must De accompdniea by each or the roiiowiny aeras, eA,.ept for an item already on file with the commission and identified in the application: (14)a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 AAC25.080 for an annular disposal operation in the well.; Waste fluids generated during the drilling process will be disposed of by injection down an Oliktok Point or Spy Island Class I disposal well. Alternative disposal method will include hauling the fluids to the Prudhoe Bay Grind and Inject Facility. 15. Attachments Attachment 1 Drilling Procedure Attachment 2 Directional Plan Attachment 3 Drilling Hazards Summary Attachment 4 BOP and Diverter Configuration Attachment 5 Formation Integrity And Leak Off Test Procedure Attachment 6 Surface Platt AOGCC PERMIT Document Page 7 of 7 Printed:6-Mar-15 Attachment 1 Drilling Procedure rt enn us operrafing WELL SP04-SE5 L1 Drilling Procedure SP04-SE5 L1 Spy Island Conductor slot #04 Reservoir location #SE5 L1 Producer (Schrader Bluff) Nikaitchuq Project SP04-SE5 LI Drilling Wellplan Page 1 of 22 03/09/15 f 2nd us op rrahinns WELL SP04-SE5 L1 Spy Island Nikaitchuq Field 2n° per &eun North Slope - Alaska SP04-SE5 L1 ; DIR/LWD FORM DEPTH •-- --HOLE CASING MUD INFO MWD MD TVD SIZE SPECS INFO Cement to Surface 20" 0 Hole Angle ie.' X-65 • 0° 20"Conductor Shoe 160' 160' Driven Welded N/A 0 0 GR/Res v r Surface Csq Dir/PWD 0 13-3/8" 0 3.. 68# MW(ppg) Wellbore Stability Mud Motor B/Permafrost 1,939' 1,752' r L-80,BIC 8.8-9.5 Lost Circulatbn w Hole Cleaning '" Casing Sections KOP:300' ° Casing Wear DIS: Surface T/Tai Cement 2,673' 2,231' 0-3.5 0/100' Hole Angle 64.01 Deg 13-3/8"Csg - 3,178' - 2,454' Ai 16" 50°F WBM GR/RES/PWD Inter.Casing Wellbore Stability 9-5/8" Lost Circu.. Xceed 900 400 MW(ppg) Hole Cleaning L-80,Hydril 563 8.8•9 5 Torque&Drag Casing Sections Tangent Angle: _ Casing Wear 86.00 DegBHA Expense Intermediate TOC 5,204' 3,543' _ Pick-up Top of Sand i N Top 6,204' 3,946' - 1_, Hole Angle TOL 6,916' 4,042' , pi 87.73 Deg Base Whipstock 7,116' 4,056' !, 12-1/4" 85°F WBM GR/RES 1 I I Ecoscope/PerSCOPE rEl M Wellbore Stability X' I I Lost Circulation OI I I Slotted Liner Hole Cleaning I 91 5-1/2" Torque&Drag 121I:2:1 15.5# MW(ppg) Casing Sections Xceed 675 I I L-80,Hydri 521 8.7-9.4 Casing Wear I I BHA Expense 9.1 I I 21 12 I I Liner shoe TD 17,377' 4,134' 121 LEI Hole Angle 88.52 Deg 8-3/4" 85°F MOBM SP04-SE5 L1 Drilling Wellplan Page 2 of 22 03'09 15 _ �► 0 ernli us operating WELL SP04-SE5 L1 Table of Contents WELL PLAN SUMMARY 4 WELL HISTORY 6 RIH WHIPSTOCK AND 9 5/8" MILLING OPERATIONS 7 Pick Up Production Drilling Assembly 9 PRODUCTION SECTION 10 Production Drilling 12 Production Liner 13 ATTACHMENTS 17 Recommended Drilling Practices 18 Health, Safety & Environment 19 Safety Meeting Topics 20 Well Shut In Procedure While Running Production Tubing 22 SP04-SE5 LI Drilling Wellplan Page 3 of22 03/09/15 • rn1� us op rr ing WELL SP04-SE5 L1 WELL PLAN SUMMARY Rig: Doyon 15 Type of Well: Producer Well Design: 13-3/8"Surface x 9-5/8" Intermediate x 5-1/2"Liner Close Approach and Offset Well Interception Risks It is important to stay as close as practical to the planned directional program. The directional program and a summary of close approaches can be found in the attachments. These close approaches will be in conformance with the minimum well separation criteria detailed by the Drilling Anti-Collision Analysis and Close Approach Guidelines. It is the responsibility of the Directional Driller and the Drilling Supervisor to ensure that the directional plan is executed as planned,that the position of the well as it is drilled is monitored on an anti-collision diagram and that no tolerance line for close approach wells is crossed. It is important that the well bore remains close to the planned well path as any major deviations from the profile may adversely affect the ability to drill future wells and still adhere to the current close crossing guidelines. Survey Program & Procedures Take MWD surveys as frequently as needed,but no less than every 100 ft. Carefully review the anticipated close crossings with existing wellbores and future well paths. Make sure that directional drillers are aware of all drilling close crossing issues,hard lines and no-go lines. If a no-go or hard line has been or will be crossed,ston drilling immediately and contact the Drilling Superintendent to discuss options. Mud Logging Program Mudlogging will be utilized from spud to production hole TD. Refer to the Geological Mud Logging Procedure document. SP04-SE5 L1 Drilling Wellplan Page 4 of 22 03/09/15 en us operrahng WELL SP04-SE5 L1 OBJECTIVES: 1. Drill the well at or under AFE cost and time. Perform work in a safe and professional manner meeting all ENI Petroleum Health, Safety, and Environmental requirements. 2. Cut window in the 9 5/8" casing and drill 2nd lateral per the well plan. Maximum dogleg severity in the landing shall be no greater than 3.5°/100' DLS. 3.Land Intermediate casing point within 100' radius of the planned directional target. 4. Execute the setting and orientation of the whipstock per the wellplan. 5. Target Greater than 90%within the OA sand Reservoir. 6. 8-3/4" hole LWD Failure Requirements: GR/Res/Dir/PWD—Require GR/Res/Dir to achieve TD. SP04-SE5 L1 Drilling Wellplan Page 5 of 22 03/09/15 tisk env us operrabnc WELL SP04-SE5 L1 WELL HISTORY Current Status Well SP04-SE5 is currently planned to be drilled. After the production phase a new lateral in 8 3/4" will be performed. Scope of Work Scope of this work is drill a new 8 3/4"lateral section, RIH a second 5 '/2" slotted liner and run in with a new TTC-ESP system to have a commingle production for both lateral.. General Well info Reservoir Pressure/TVD: This well is expected to have a static max bottom hole pressure of approximately 1836 psi during the drilling time,which places the fluid level below surface. Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi BOP configuration: Annular/pipe/blind/Flowcross/pipe SP04-SE5 LI Drilling Wellplan Page 6 of 22 03/09/15 1 2rn1n us operrenns WELL SP04-SE5 L1 RIH WHIPSTOCK AND 9 5/8" MILLING OPERATIONS 1. RIH with a clean out BHA to the top of the previous 5 '/z"liner. Mill a window in 9 5/8"40#casing. Notes: a) It is important that the whipstock assembly is spaced out to ensure that the entire window is milled between casing collars. b) The approximate overall length of the casing window to be milled is 14'-16' ft. c) All measurement and procedures are to be double-checked and approved by Co.Man prior to running the whipstock/window milling assembly in the hole. d) Ensure drill pipe pup joints are available for the correct space out e) After the window is milled,the upper watermelon mill should be gauged.If the upper watermelon mill is more that 1/8"under gauge a cleanup trip is recommended to ensure window is fully open.A back up set of mills should be on location. 0 Ditch magnets should be placed in the flow line to recover all metal circulated out of the well Whipstock/Window Milling Guidelines: D Check with Geologist to confirm if there is a concretion at the window milling depth. > Never rotate a bit on the face of the whipstock > Orient the BHA(if motor is used)above the window before attempting to exit the window.Bit rotation may "catch"the edge of the whipstock and damage the face making recovery operations more difficult. ➢ If at any time during operations a problem is encountered tripping through the window area,a watermelon or string mill should be run in the drilling assembly to clean up the window area ➢ Always trip slowly and carefully(+/-90 seconds per stand)with all BHA's through the milled window SP04-SE5 LI Drilling Wellplan Page 7 of 22 03/09/15 2rnlri us operr o nns WELL SPO4-SE5 L1 Procedure: 1. Prior to mill the window,hold a Tech Planning meeting to discuss this phase of the well. Review the well plan and discuss any discrepancies or concerns with the drilling superintendent 2. RIH the whipstock assembly 3. At surface align the MWD with the whipstock face 4. Shallow test the MWD tools 5. RIH to setting depth 6. 45' above setting depth establish circulation and work torque out of string. 7. Orient the whipstock as per well plan.Once the correct orientation is confirmed,reciprocate the whipstock to confirm that the face has not rotated.Re-check the orientation with an additional survey. 8. Once orientation and depth have been agreed upon by all relevant parties,set the whipstock assembly. 9. Initiate circulation and obtain a survey of the installed whipstock orientation 10. Start 9 5/8"casing milling operation.Establish rotation to begin milling the window. 11. After the window is complete and before POOH,shut pumps and work milling assembly through window several times watching for drag.POOH and L/D milling assembly. SP04-SE5 L1 Drilling Wellplan Page 8 of 22 03/09/15 2nll us operrah nng WELL SP04-SE5 L1 Pick Up Production Drilling Assembly 1. PU the 8-3/4"bit and the BHA assembly as per the BHA diagram. ➢ 8-3/4"PDC > Rotary Steerable > Flow rate: 550 GPM ➢ 120— 140 RPM Oil Based Mud Fluid Displacement 2. Drill 20'-50'of new hole using the Oil Based Reservoir Drill-In fluid. 3. Perform Leak Off Test as per AOGCC requirements following the attached LOT Procedure. > PU into casing and perform LOT. > If the pressure continues to rise past 12.5 ppg EMW,shut down and call it a FIT per the FIT Guidelines (attached). ➢ If LOT is unacceptable to drill ahead(less than 12.0 ppg EMW),contact Drilling Superintendent to discuss options. ➢ Do not pump more than 1/2 bbl after leak off is determined. There is no need to pump more than 1/2 bbl into the leak off and extend the fracture. ➢ Plot on LOT form in N drive • tv SP04-SE5 Ll Drilling Wellplan Page 9 of 22 03/09/15 2rn10 us operrfing WELL SP04-SE5 L1 PRODUCTION SECTION Surface Formation Markers: (all depths Dovon 15: Schlumberger Plan (3)) True Formation Tops Measured Vertical Comments Depth,ft Depth, ft SV-4 720 717 SV-3 1147 1116 SV-2 1461 1379 B/Permafrost 1811 1752 SV-1 2195 1943 Ugnu Top(UG4) 2747 2265 13-3/8" Csg 3178 2454 SCP UG-2 Coal Bed Marker 3898 2799 LowerUgnu 5128 3502 Schrader Bluff Top 5935 3865 N Sequence Top 6041 3900 N Top 6204 3946 ReCalc Intermediate Cement w/Actual N Bottom 6376 3984 N Sequence Base 6549 4012 Base Window @ 7,116' MD 9-5/8" Csg 7409 4077 IN PLACE OA Top 7578 4071 OA-2 Top 8491 4066 OA-3 Top 8621 4071 5 1/2" Liner 17377 4134 Total Depth SP04-SE5 LI Drilling Wellplan Page 10 of 22 03/09/15 P n11 s operrafins WELL SP04-SE5 L1 Production Mud Program: FazePro Density HTHP FL Electrical Interval VP Oil:water Stability (ppg) (ml/30min) ml Volts Production 9.4 15-20 <5.0 60:40 >600 Production Logging/Formation Evaluation Program: Production: MWD Directional/PWD(Pressure While Drilling) LWD GR/Res/Ecoscope/PeriSCOPE / Production Drill Pipe Tool Tool Make Up Joint Body DP Tensile Pipe WT Grade Conn. Joint Joint Body Torque Torsion Torsional capacity Capacity (ppf type OD ID(in) al Yield Yield w/conn. (in) ID in ( ) lbs) lbs) (ft.lbs) (gal/ft) (ktps) (ft 5"DP 19.5 S-135 TT525 6.50 3.875 4.27( 49,600 82,700 74,100 .731 712 Production Section Notes: a. Monitor hole conditions carefully. Be alert for early signs of lost circulation and differential sticking. If any of these problems are observed immediately notify the Drilling Supervisor or Toolpusher(attempt to keep the pipe moving and circulation established). Ensure that all team members are communicating with each other on any observed drilling trends and that everyone understands the potential risks. b. Shallow test MWD tools. c. Good drilling and tripping practices are vital for avoidance of differential sticking. Make every effort to keep the drill string moving whenever possible and avoid stopping with the BHA across the sand for any extended period of time. d. Keep shut down times to a minimum during connections. When surveying in this hole section reciprocate the pipe slowly while the survey is transmitted uphole. Keep the pipe rotating whenever possible. e. Ensure the Top Drive Torque Limit is set below the lowest make up torque in the string. Do not run the risk of further make up to a connection while drilling. Openhole Sidetracking Practices: f. Lowside in a fast drilling interval where the wellbore is heading up and where the ABI's show a good build rate. g. Orient within 15 degrees either side of lowside and trough with high rotary RPM's while reciprocating from the kickoff point back to the first stabilizer. Trough for approximately 30 minutes. h. Time drill at 4 to 6 feet per hour with high flow rates and rotary RPM's for the first 5 feet. Gradually increase the penetration rate as the openhole sidetrack is achieved. i. If any openhole sidetracks are drilled,confer with Drilling Supt.and consider tripping without circulating or without rotating past the sidetrack point. SP04-SE5 L1 Drilling Wellplan Page 11 of 22 03/09/15 • cin o - us operating WELL SP04-SE5 L1 Production Drilling 1. Directionally drill the 8-3/4"hole to TD. ➢ Geosteering will be required to remain in the target boundary 100%of the time ➢ Maintain sufficient flow rate with maximum pipe rotation as needed to bring mud/well properties in line. ➢ Maintain proper Calcium Carbonate concentration per MI mud plan. • Ensure Centrifuges are operating effectively to remove fine drill solids 2. Backream at TD: ➢ At TD circulate 50%of calculated TAD cleanup cycle nulling 1 stand per bottoms up. Once the first 50% cleanup cycle is completed circulate the remaining 50%of the calculated cleanup cycle pulling 2 stands per bottoms up. Decrease backreaming speed as torque and pump pressure dictate. • 550 GPM • 120-140 RPM ➢ Backream into the intermediate casing shoe. • 550 GPM • 120-140 RPM • Slow backreaming speed when pulling BHA into the Intermediate casing shoe/rathole. Hold parameters steady at 550 GPM and 120 RPM. • Decrease backreaming speed as torque and pump pressure dictate • NOTE: once backreaming in the open hole has been started,do not stop backreaming. Do not attempt to pull out on elevators once backreaming has started. 3. Drop rabbit down drill string once bit is above the intermediate shoe:the SLM of landing string portion of the tapered DP • Drift OD dependent on Completion • COMPLETION DP RABBIT SIZE:2-3/8"OD • All drifting tools will be accounted for and held in one place at all times. 4. Continue backreamine until depth at which it is possible to pull out on elevators at>9.1 swab EMW at 2.5 min/stand • 550 GPM • 120-140 RPM • Determine depth at which swab can be kept>9.1 EMW at 2.5 min/stand as per K&M TAD Model. 5. Circulate until shakers are clean as per K&M. • 550 GPM • 120-140 RPM 6. Slug DP and trip out of hole on elevators. ➢ Utilize K&M's swab model to control trip speed and avoid swabbing the open hole below 9.1 ppg EMW. 7. Lay down BHA (/ SP04-SE5 L1 Drilling Wellplan Page 12 of 22 03/09/15 2rr110 us op rrahng WELL SP04-SE5 L1 ➢ When out of hole,down load the recorded tool data and send to the Geologist in town 8. RIH with retrieving tool assembly to retrieve the whipstock assembly Production Liner Completion DP RABBIT SIZE Will BE: 2-3/8" OD Production Liner OD Conn. Cplg ODCollapse Burst Tensile Yield (in) WT(ppj7 Grade Type (in) ID(in) Drift(in) (psi) /psi) (kips) 5-1/2 15.5 L-80 H521il 5.713 4.950 4.825 4990 7000 242 Production Liner Connection Make Up Torque (ft-lbs) Min. Target Max. OD WT Grade Conn. Type Make Up Make Up Make Up Yield (in) (ppf) Torque, ft- Torque Torque* Torque lbs 5-1/2 15.5 L-80 Hydril 521 4600 8100 N/A 24,000 * See attached TenarisHydril Guidelines for make-up torque recommendations Production Liner Centralization From To Quantity/Joint Fixed/Floating Type Shoe Liner 1 /joint Fixed 5-1/2"x 7" top -Mid joint -Crimped on -Hydroform,Volant(Crimp on) Liner Running Procedure Notes: • Ensure proper crossover from DP to slotted liner is on the rig floor in case of a well control situation. • Liner top should be placed a minimum of 200 ft above the intermediate casing shoe. • Ensure accurate torque and drag data is gathered. Record pick up and slack off weights every stand and free rotating torque every five stands. Data gathered will assist in future liner running operations throughout the project. • Perform visual inspection,measure and caliper all components prior to running any assembly in the hole. Ensure accurate dimensional data is recorded for all equipment run in the well and recorded in WellView. • Ensure all equipment has been hydraulically and operationally tested. Also ensure all equipment to be run is dimensionally compatible with all other equipment. • Review all setting operations and shear pressures with Baker Oil Tools service hand. • Ensure that all workstring components have been rabbited as ball will be dropped to actuate downhole tools.Rabbit DP on last trip out of prior to running liner. • If any openhole sidetracks have been drilled,monitor sidetrack depths during run in and ensure shoe enters the correct hole. SP04-SE5 L1 Drilling Wellplan Page 13 of 22 03/09/15 2(no us operreing WELL SP04-SE5 L1 • Torque ratings for string components: String Components Yield Torque(ft-lb) 5" 19.5#TT525 Drill Pipe 74,100 HRD Running Tool 40,000 7"29#Hydril 563 39,000 5-1/2" 15.5#Hydril 521 24,000 • Shear pressures for liner hanger assembly: Item Description Shear Value Shear Range HRD Running Tool,7" Nominal- 3192 psi 15%+ 3671 psi 6795 mch rel,3 pins 15%- 2713 psi Pusher Tool Activation Nominal- 1986 psi 15%+ 2284 psi 15%- 1688 psi Pusher Tool Neutrlz. Nominal- 3588 psi 15%+ 4126 psi 15%- 3050 psi Ball Seat SOLID *****Make-up torque for liner hanger sub-assembly,including running tool connections,should be torqued to 14,000 ft-lbs prior to deliver to rig. Procedure: 1. Hold Pre job safety meeting to ensure all parties understand operation 2. PU the Liner Assembly and Running/Inner String as outlined above. 3. RIH with Liner Assembly. Record PU and SO weights as required. 4. Pick up liner hanger assembly and make up to proper torque. Fill Liner Tieback Sleeve with"pal mix"and ensure mixture is thin enough to travel past the HRD tool and down to the packoff. Wait 30 minutes for mixture to set up. 5. Trip in hole one stand and circulate 5 bbls to ensure all flow paths are free. Record ROTATE,PU and SO of liner assembly. 6. RIH in hole to casing shoe with DP. RIH with Liner Assembly as hole conditions allow,but do not exceed running speed of one stand per minute. Break circulation and fill DP as necessary. 7. Monitor mud flow while running in open hole and slow running speed if necessary. Circulate minimum of one DP volume and record ROTATE,PU and SO weights. 8. Record PU, SO,and Rotating torque in open hole every 500' to ensure friction factors are sufficient to run the liner to bottom successfully. If friction trend indicates liner will not go to bottom then call Drilling Supt.immediately. 9. Rotating liner 20-60 RPM will be necessary to run to bottom. 10. Continue RIH with Liner Assembly to proper setting depth. Liner should be spaced out to locate the liner top approximately 200 feet above 9-5/8"window. 11. Trip slightly deeper than desired liner top location with liner top. Last motion of the liner should be up to ensure it is set in tension. Ensure Liner Hanger assembly does not exit 9-5/8" Window. 12. Prior to setting the hanger&packer,double check all pipe tallies and record amount of drill pipe on location. 13. Rig up to pump down workstring with rig pumps. Pressure test lines. Bleed off test pressure. 14. Drop setting ball down the workstring and pump slowly(1-2 bpm). Slow pump before the ball seats. Do not allow ball to slam into ball seat. SP04-SE5 LI Drilling Wellplan Page 14 of 22 03/09/15 frAls 2nd �s operrafinns WELL SP04-SE5 L1 15. Pressure up to 3000 psi and hold for 5-15 minutes to set SLZXP hanger packer. Continue pressuring up in 500 psi increments holding for 5 minutes each up to 4000 psi. 16. Packer can now be pressure tested. Bleed DP pressure to zero,close annular preventer and test annulus to 1,500 psi for 10 minutes and chart. 17. Bleed off pressure and pickup to verify that the HRD running tool has released. If packer did not test, rotating dog sub can be used to set packer. If running tool cannot be hydraulically released, 6,795 fl-lbs of left hand torque can mechanically release the tool. 18. Once running tool is free and packer is tested,Displace mud from liner top to surface with 9.0 ppg KCI brine per MI recommended program. 19. POOH and LD and inspect the liner running tools. SP04-SE5 L1 Drilling Wellplan Page 15 of 22 03/09/15 ...w a enn • us operrahnng WELL SP04-SE5 L1 RIH ESP Completion Prepare to RIH completion: 1. MU ESP assembly and RIH to setting depth. 2. Land hanger,RILDS and test hanger. 3. Install BPV and nipple down BOP. 4. NU tubing adapter and tree. 5. Pull BPV,install test plug and test tree. 6. Circulate Freeze protect through tree down IA. 7. Shut in well. 8. RDMO Below the final schematic of the well after completion: 4-h'12.6 ppf Production Tubing ariS I , I 'r. I vi-2,304'MD,2.018'TVD 48°Inc-GLM.KBMG,445'x 1',with 2,000 psi STS-1 SOV installed eni petroleum 4-h"s-cplg cable clamps,for ESP Power I Cable,(1)3/8"Chem lift Line with 2500.0 SP04-SE5 psi check valve at bottom +/-6,695'MD,86°Inc-GLM.KBMG. 4-h'x 1",with 3.100 psi Dual Lateral Producer STS-1 SOV installed with ESP Lift +/-6,796'MD,4,034'TVD-Discharge Gauge Sub As Planned 0/_6,840'MD,4,037'TVD,86°Inc-Bottom of Motor Centralizer Centnlift,TTC-ESP, P3 73 stage P35 SXD+50 stage G42 SXD pump+24 stage GINPSHL SXD,513 OSB3 ./4y, seals.240 HP MSP325 motor.gas separator ' +1-6,870'MD 32#Shroud Assembly with cable and chemical Surf Casing - "j:.' injection line feed-thrus.3 5"perforated gas dispersion tube 13-3/8".68# .k, 4 X"Lateral Entry H-3,17V MD, '/•01 4,,,../r Module(LEM)w/3.68 Silver Bullet Ecc.Nose 2.454'TVD e Seal Bore Guide Closed Shoe TD 8 3!4" 64°Inc #e ,J� 5 0:"l t ed L net •!_17.360'MO.4.134' '!-17.37]M �\ H- 7,100'-7176'MD. L80 Slotted Liner 4.134'TVD TVD.90°Inc I,Dbb'-4,Ob6'TVD _ —` 89°Inc +/-6,890'MD,4,040' 1111' Casing Exit Window TVD-Ll-Baker SLXP Liner Hanger/Packer •/- 6.916'MD RAM Hanger '\< — — — f 5 960"Lateral Dnft ID - - " 3 688-Mainbore Dnft ID i 4-h'x 9-5/8"-•M i HAL 5-h'Oil Swell TD 8 3/4' Seal Bore Diverter `• �*5 Sealbore Receptacle w/3.68"Seal Bore 4.75"ID Packer 17.398 MD, 1v '1 O 4,153'TVD 93°Inc. .1-7,209'MD.4.061'TVD ', a 'IMF 'IBM MLXP Liner • ' Hanger/Packer C• Bottom of Seal = � � Assembly Interm Casing 9-518",40# 5-h-15.5 ppf L80 Slotted Liner Silver Bullet Ecc.Nose Guide Shoe +/-7.409'MD.4.077' •I-17.372'MD.4 155'TVD.90°Inc. Nikartchuq Field-Spy island TVD 81°Inc. SP04-SE5 LI Drilling Wellplan Page 16 of 22 03/09/15 • • ern• us open ng WELL SP04-SE5 LI 9. ATTACHMENTS 10. Recommended Drilling Practices 11. Health,Safety,and Environment 12. Safety Meeting Topics 13. Well Shut In Procedure While Running Tubing 14. Conductor Broaching Contingency Plan 15. Port Collar Decision Tree • SP04-SE5 L1 Drilling Wel!plan Page 17 of 22 03/09/15 I 2n us cop rr inn s WELL SP04-SE5 L1 Recommended Drilling Practices Hole Cleaning With a deviated well path and potential for losses,hole cleaning will require special practices. Pipe rotation is critical for effective hole cleaning. The maximum string RPM,as determined by the BHA,is specified for each hole section in the detailed procedures. The shakers should be monitored as an indicator of adequate circulating time. If circulation is of long duration,then pipe movement to prevent casing wear is critical and a stand should be laid down occasionally to prevent excess hole erosion over the length of pipe reciprocation. In addition the following practices should be employed at all times: a) Use all available solids control equipment to keep mud as clean as possible. b) Emphasize proper hole cleaning after slides by rotating at maximum allowable RPM c) As the hole angle increases,hole cleaning practices must be altered. Maximum pipe rotating speeds along with maximum achievable flow rates will increase hole cleaning efficiencies. Circulating times prior to trips should be increased accordingly to account for longer times required to remove cuttings from higher angle wells. d) Use good connection practices while drilling. After reaching the bottom of a stand,allow a small amount of circulating time to allow cuttings to get above the BHA prior to picking up off bottom. Be sure to pick up slowly to prevent packing off the cuttings bed around the top of the drill collars. Slower Trip/Connection Speeds High POOH and RIH speeds can aggravate fragile shales/formations due to the pressure variations between surge/swab. PWD data shows that excessive tripping and reaming speeds can exert pressure spikes in excess of 2 ppg equivalent. Effective ROP Strive to find the maximum effective rate of penetration.That is,the maximum rate at which a clean hole can be produced. While on bottom ROPs in excess of 400 ftph may be possible,but such ROPs may load a high angle hole with cuttings that are not being removed fast enough. Using torque and drag trends,ECD and the shakers,establish a base line clean hole ROP,and then try to improve it by altering the hole cleaning practices. Slower Initial Pump Rates PWD data has shown that the most significant period for increased ECD occurs when the pumps are brought on at drilling rate while washing a connection to bottom. The study also concluded the least damaging procedure is if pump rates are held at 40%or less of drilling rate while reaming connections. SP04-SE5 L1 Drilling Wellplan Page 18 of 22 03/09/15 2no us operating WELL SP04-SE5 L1 Health, Safety & Environment The following are part of the mitigation&contingency measures to be put in place in order to complete this project while helping to meet our HS&E goals. It is the Drilling Supervisor's responsibility that these measures are implemented and communicated to the relevant parties on location. Good communication when drilling is essential for increasing the safety of personnel and equipment. H2S Contingency Measures Assume all locations have the potential for H2S. 1. The AOGCC will be notified within 24 hours if H2S is encountered in excess of 20 ppm during drilling operations. 2. The rig will have fully functioning automatic H2S detection equipment meeting the requirements of 20 AAC 25.066. Manual detectors in accordance with 20 AAC 25.065 will also be maintained on location. 3. Self-contained Breathing Apparatus for all rig personnel will be maintained on location. 4. All personnel engaged in the drilling operation will be trained in H2S emergency procedures and the use of proper personal protective equipment. 5. A standard H2S contingency plan will be posted at the rig. All rig personnel should read and familiarize themselves with this document and copies should be posted in the rig floor doghouse and in the camp on location. 6. H2S treating material for the drilling mud system will be available on location in the event that any H2S is encountered. It is expected that the rig and personnel will have the equipment and training to identify and contain a H2S emergency situation. If it becomes necessary to notify the AOGCC of an H,S encounter,drilling will be susnended and will resume only after the development of detailed remedial and contingency procedures,full compliance with 20 AAC 25.065 and the applicable referenced sections of API RP49 and approval of the AOGCC. Lessons Learned Documentation of lessons learned has been proven to reduce downtime and increase efficiency of rig operations. It is expected that planning meetings,daily operations meetings and pre-tour meetings will be held on a regular and consistent basis and that the records of those meetings will be placed on the N drive in the appropriate folder for this well. SP04-5E5 Ll Drilling Wellplan Page 19 of 22 03/09/15 2rnlo us open hins WELL SP04-SE5 L1 Safety Meeting Topics Move In, Rig Up > Prior to spud,a safety meeting should be held with the rig crews to discuss open hole drilling procedures. - Subsidence around wellheads-use of buddy system, - Conductor broaching operations and contingencies, - Shallow gas hydrate drilling practices, - Proper tripping practices and hole fill calculations with various sizes of pipe and tubing, - Well control procedures, - Flow rates and hole cleaning,and - Diverter operation and crew responsibilities. > A'Diverting Shallow Gas'drill should be held with rig crews prior to spud,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. D. An'Accumulator'drill should be held with rig crews prior to spud. Document drill and record on morning report. ➢ Shut-in drills should be held on a regularly scheduled basis. A suggested minimum is once per day on alternating tours. Document and record on morning report. > Check trip tank for leaks and confirm gauges are calibrated. Complete trip sheets and submit to the Drilling Supervisor after each trip. ➢ Perform and document all drills. ➢ Designate crew member to control access at the pad entrance in case of diverter operation. Surface > A'Stripping'drill should be held with rig crews prior to drill out,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. > A'Well Kill'drill should be held with rig crews prior to drill out,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. > A well kill sheet shall be posted in the doghouse and updated each tour. Intermediate ➢ Prior to picking up the BHA a safety meeting should be held with the rig crews to discuss hole risks and open hole drilling procedures. ➢ Potential formation pressures and mud weight,Well control procedures. > Hole cleaning best practices,flow rates. > Stuck pipe,Lost circulation. ➢ Proper tripping practices and hole fill calculations with various sizes of pipe and tubing. Production ➢ Prior to picking up the BHA a safety meeting should be held with the rig crews to discuss production hole risks and open hole drilling procedures. ➢ Potential formation pressures and mud weight,Well control procedures. ➢ Hole cleaning best practices,flow rates. ➢ Stuck pipe,Lost circulation. ➢ Proper tripping practices and hole fill calculations with various sizes of pipe and tubing. SP04-SE5 Ll Drilling Wellplan Page 20 of 22 03/09/15 en us operrei nng I WELL SP04-SE5 L1 Completion ➢ Operation of the control line spooler. ➢ Pinch points associated with tongs and slips. ➢ Proper tripping practices and hole fill calculations with tubing and control line. ➢ Well control practices while running production tubing with control line. ➢ Pressure testing and minimizing personnel exposure to pressurized lines. SP04-SE5 L1 Drilling Wellplan Page 21 of 22 03/09/15 2nD us operreons WELL SPO4-SE5 L1 Well Shut In Procedure While Running Production Tubing If well is suspected to be flowing: 1. Install TIW valve and pull back to the first banding point below the BOP stack. 2. Shut off air to control line spool and bleed off line pressure while checking well for flow. 3. If well is confirmed to be flowing,cut control line with bolt cutters directly above a banding point. 4. Slack off until full joint of pipe with no control line attached is spaced out across BOP stack. 5. Close annular and monitor pressure. If well is coming in rapidly and time is not permitted to complete above operations: 1. Install TIW and close annular around pipe and control line. 2. Shut off air to control line spool and bleed off line pressure while picking up a joint of drill pipe and making it up to TIW and top drive. 3. Close IBOP on top drive and open TIW valve. 4. Cut control line and strip the joint of drill pipe across stack for ram closure if needed. 5. If annular does not seal off around tubing and control line and the joint of drill pipe cannot be safely picked up, close blind/shear rams on production tubing. Notes: • Specify location of bolt cutters required to cut control line. • Need to have access to a joint of drill pipe and the appropriately sized elevators at all times. • SP04-SE5 L1 Drilling Wellplan Ian Page 22 of 22 03/09/15 Attachment 2 Directional Plan N O r E.- Nn Nmd 1-r ,7“,, ..1.31 Nrrrm 7.Oo m Om ? 8g IV O Q n On N M 'O pO O tNomOM -m2,.-WN 'LoroOOmNrOm'mOmNNNc, N M1Nm .� BaD .- mmnNhNd Z 2 1R2 NNNNN NNNNN 2N . 1 NNNth 21101 113 13 y ;;;;; ;;;:; 22222 22222 22222 22322 52222 m Q W N O ? MDmOa OOON 442OO 4pp.42 <lira QM Ny1 HMI MA mE N N N N N N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N , arDOO2. M 2goW222m mNN2.9 .PN00 2'4244 10yy1O44404 44.2,24 ? NQ Ommmm M2222 DNpp pMM mODDO 20rmmS,%WGr W W C O N W d O N =t P2 ga i'3 d M d NN m 42222 NnMO; ?:.-442 22122 Ny2N N D 8 dd 8882 n n OCmmmmm COmmmm COGLmm mmmmm COmmmm mmmmm mmri66 b d .42 82 0 O "— <°"'3 0<0 O O O 88888 OOOO OOOOO 88888 OOOO OOOOO 88888 OOO8 O 8 gNO0VOOO64444 CNIVNO NNNO ON ONClG I LL e KmK f.,%K-K= 1JW JN2 JJJNJ 8JbJ=K (=0,W (2,(32 OJ h8N N nn n� 10101010 nnn mo0oooio 0J o NanW N vt 8 O a E o m m m N = GC dd CmrnY:0 ! !!: 82 !! !! !!!!! aNOmdNdmDi r. <N0tmhO:mm MMMQQdco ZCOD2OPm! OyN ' ' M NQMNnNmco4 N Z NNNNN NNNNN NNNNN NGp ob p O ' m o~O V r e .E▪ C N f R C W E ' E' w /0 V a E a= d V N 17", y V mfg O 0 6"g W d LL m.. o S z r U mNN 1.N mr.o m NMro,- »Can d YO�.KO� =C ILW •• C r d 0 N MNNannNd OMW N,-1. N0.00N p ...Q OdMd M O UGCV0w U. Od W.E 8maNi7M 822 M mNO hdW0M �O ; m Q ✓ JNO gri 0� ! ") "CMMNir QNiS ' P341:1 NNMyrtNrj 3 Nu qgCLUUw L C ZY- 1. maLwCa0aiCf rofofzV2.J Y O QCNQOQN sN7N ppmodyy rt8 8888 0000 a.; yy Z0O NNNN 6',z,70 OOO OOO OOO OOOOOOOOa<aaO Oada aa aaa adadd addda ddadd d d ddd d a a Cb Q p p a y J M 2E :=8242 ttp Omi NN OONO OODr mMN t0ht0 MN f8O l2hNNN r28 V 4882? th r. O 0000 :7-;;;; -uir r1. mvia a a m mm�N mr00 �OOOO OMOMM M W 8 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 O Cl) O d d d d O d d d d d dad a d d d d d d d d d d d d d d d d d Q a d d li N Q^ tAjo mm tpp 1 ::;878 `c8888? 27100 N NCM8OQi00 mm mm2 2202000 m 0001000 00000 m COVI (_ '. ?-'?4 m m m O A4;-,28 {{pp IV aD tG Yl '4.888.8 . IL ;; E:12 N M M N N N 8„".1888 N NNN N N NNN N N N 8 N N N • CL r"71".6, E r N N d W O M' m rO m O 00OI ° Orr mA QO2ci,S0 SO21; n 0 0 101. O821;.821;.%2 M :=.7-.82.8 7 0 2 0 OOn r 0 E O .a--c95 g „ 20OmmpOOCOOOOC100mmmmmmmoAAApWWO O O = wJ7d m 00 iowHi2§- O u a.'2ENNN2 OnOm LW_xf4a9CNnN Z Z Z O N • •°E8""0 0r 000Nr 0mr m0000r 'S82' S82' ;;8288 8 p an 8 :2'4882 8 M ONt8n M 8 `00000- mOOr0 O- r rNn8ar OE d 8-M n ON 66464 Od C nt�n Mdm nmnnmm mM 810 8 2 8O2 Mmmmm 08 2 80 8 0 CNQ O d n j( u W C pt) o co _ d c ly e't m 2 N lli.= Oe-12 ;- CO v 2C « nt8o Q 0 c EE Vi Q RUvmANNC m3> E HIaU Z0 Z 0 20 2? 20 Z 0 2? U a U AN UA M U 1. UANUamU 0 2 gZF22 F22F951 Z5NOO W UHWUH WUH WUF WUF 8 UF-Wo, 6 • • N t OQ 1pp 1pp 3228:2 p op N C 6 001.s0 N120NN00 NmMONDN�Op �t9-288 8'OD.1� Nmm�pppp PinN 22D28. Mn W IN04 078 W sC v Nww W cOm mN mmw 88M00 OON,N lOad7QN •-r`•-22m 80DmMO EODNv-.-O0 OOm pN pN NI, d ` 3222 2,”), , t) 7 22222 N22NN 22222 2 2 2 m•O ..... ..... m N N 22. O O O O O O O O ::::: O :::: O ::::: :::: :::: 00 088 886 66 IDDp :OM:NN : (p Q {pQ'O oi N a 8M 08- 127080/8 4 W Oni{mOym 0NO0 NO NQdn ON 200 N'07N ON2m8 O V vg t00^N 0 1g— 10000 iZnnnn nPPc12 22228 0Y,F,gd 2.0280 2mOn8 88880 [7 ROf07 NNNM 1 O 0 D C D m m mmm m m m 8 m m m 8 0 0 0 O O O O Y 1 N woo. 2 2 2 2 2 ..... 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 H N H 2222. N H H H H N H N N 0r E7 yi°.TmdmNNp244800Q O-,.48 488.8822Wp78 2c712Md a827 Q8WWM �mm NC220888000 08888 22288 88888 888m8 88880 6M22W 08888 825 C O b t Y WX Y C O N c Y w O Qd W pp 8 pp 2 % .-'`1°P?! r r r r END 2 2 2 88882 8;331 0 2 8 0 O O O O O 888'-'1 N M M Q 0 8 8 8 2 2 ‘”C O C W m fO M 66666 6mmm6 666646 8 8 6 6 r n n n n n n n n n n n n n n n r.:1.:1. r r r r e EffE M M M M M v v v y2, aaaaan w ww ww ww wm p 00000000 y a vvaj SdaS 0. 6' 8888 SSSSS 88888 88 55555 88888 88858 55552 88888 888 oa CO CO CO CO CO CO CO CO J 8 37 .- .O. .- O -.-0 1V 0N0 . O. 0 N IV N O IV IV of IV 6 N NNN O N NNN 0 .z.,6 t o W W W W W J J J 0 66 y6y y6y COMM M O0 8$0,00, vWi 00000$$,0) d • 06 0^ omw w WW J6 W OOJ ( J6K K6 xJJJ6062666 660 6 (MOM M KN JJ -16 =288 ==VO= 78-202N=00= 07=J JJ=== ===a= ===% mm=,44= n nnn OO 00 .-0 O 00 000 o 00 00 •-O O JJ LU Ui E p000• QLLIU' Q H =Ulf yf�yE 6+6+6z+6 o +U' prp U1 >p 9 6 N O g m M 8 M 0 M 8 ZO 8 d 6 M G 8 M M 10 8 2 2 0a 4 2 2 M d 8 8 M,S 8 2 MON a 2 8 2 6 U > W� 0 �087d dNm�n M02M0 h8M8N M82uld 27200 d282M 2d2Q0 206 Y Z�1� 1�?�I� IA g.-{p O g G N g c,..:. , M m OO C g 17 G Oi Oi Oi 17 d g. Y) O o G Oi g r N m fV m N 2 8 7N N 6 m 2 M 0 b m'OMi A 02i 2 M Y O N M O N O O O N Maa maa m m2 N L m m m m m d m m W 42122 100008 66626 210866 nn n e n [:12F,7-7, Eo66 m m m mmm rn ass 2 m m m 0 6 6666666 0 I m a1p Lo 9 6._ ^,-N8 0 m2 M2 NN NO m 768 M N CD N7 •7 M NM H con n-, rol o..cm7 8%880 NOV O S2r NN000 w w i. N� wow.0 coNNN0 M.-lOmd O Ip Oia N 0100 d 026 mm M 8Oi 17 W(WMM �co6 ya O�y7 66I4m6 mN 01.- Ip 1(AppN d of Qoioi E=mo 2882 M2 /1 2888 N NMI i7,; m 1psss00i 62NNO Qb1On8 ArMNN N77NfV NNNNN NNA q ���2Oi 1022 SOV( M v U m N A1n 2WO' .MOW t v .. . Np08n 7:26:28 38202 p7 O777M8p0W . OONONrM 0MM051OW8p'55522O2p T 8028 :28228 ro2'8M 88024 MN00N8H Or280pfr rpN d66626Om0O 0 eM4NN O888 "HN2i0NHHH S6AnNNMN 8rM6m.70NN2O2 mm0 T L a 0 {p ttpp pp p Ip Ip pp I1pp �1y� pp Y_ MN00 88.7NN r8�808 2c7A2A 82220 �NOI mN t00.000ir m rM08 O'N.d-40 x18:: 2Eo 000000 o (y (y E-88888888 CMMM 1MB mm2 W OON N iONOC nr Ei1•iggn m2161O6 0FNv d 7N 00 OOOoN ;,-Ag a 66666666 0 8 8 0 8 8 8 8 8 2 2 2 2 '&74'.7.914" m 8 m 8 6 0 2 0 m m 2�� N N N N N N 444? 44.44 44444 44444 4444, ,,'a,d ddddd dd'QQ ddddd ddd o 00000000 O w co M 0 0 S 0 M0 0 O O O O 2 0 0 0 0 0 0NE SEN0pp8 82MOO nno707i7,:284 aNN488 p2887 86280mONON 8VOM8 240 2 0000000,5755508 • 00800008 N2N2 N1M2 d M 2mmmV 7OONprD0GC CDMMOCGOYrEOO OOOO 774 7O dQ00O *0777 7dddd 77700 00777 0-1-34 00d 00 00d n 2-m5M5NN m e N 1Z7 0 n r 8 r E1 W Eom D 1C8288 EOOm mE`mmm 8228Z 00000 02660 0822.7 mm22o EomomO 888 8 E 0 8 8 8 7 7 8 8 8 hnh. N2Ni.4g1 glg,"4.4r; nNNNN NNhNn .4.4"N88 N NNnn hnnhlN Niggthl N4'4 8E'oOO E o 2Sr, NN 5 2 1 7nn ui o 0 C.- 005IQ�, NN 100,80 08HH5 M07i07.rN `1.15,7 a 58007 x2885 77777 571.01805 NNH •o W ��NNMMM d 8888 82888 8262%8 88822 88888 80'5228 88%82 821,11,'2 228888 882 a K Q 6 U ....:4:74' 00 0 5 0 M 6 2E81 8:2;88 224,%1 88RO.s 86,828pp28 88808 1528 55288 rpM8 55t mmSOg0A N %M0ONE2mE00OM B02O00 ^'Ll221 O.-.- NNNNNNNMMMMMmM7 dd8d8228866aaM80 m 6 n C N r 0 N CN 11. 03 o E y 0 0 0 Oo Oo o la • 2g L$ 2 0 2? L: 2 o Lg LS L" ?LI Lg 2 tt IT EE U�m U.=O, U 5�Ua� U��U ?� Ua UA 2 U1�� ON corU.-.- 0 3 'LOl 'c 2T c 201c L01 ct01'c 201 'L 0, Et '201 92 Til 'c 201 Ea >? U W UH wUf w Uf wO)- W OI-w of- W U I- wU F W OF ;ES I- wi) W I- 00 0 . c . k _ ,.7, c 2 Cla to . AZ — > (n °■ co u) _ 02 { _ \ • } ( 2 ? ' \ \ j ( [ j� & 2 _ , !) ,s. . r6Fg .f ,2'2 ') rF ` . - 0 � /� . , \ say k � . . — j' § . 07 ;r/r �j . r ( § ) ea ! |\ . . r \( _ T. r !d i 5i` C 9 / 4B; PI ` /° 8 �Er , ! ®} i b// ` 2 _ j � . ! 2 RP,i El q I Li . z ! \! . .. , ) § / if) ! . ( § § , §r;[ rr ! ] ( / § 2 , F O. j -, r r r 0/°' ` w • ',t'2 . •,; ;a; :R3 li / / § - � � / � • /\8 ! ` �§ ! | j !; ii \ - 7',:;2 ; / 7_ , 0. ° ° e � , 9\\ . . ;r/r ! , le= r ^ -.0.7;z!§ ; •; ; � ! § � § k ` ! .. . 2 ! ° , , 11 a | clan (Ti)Sm ) 0 . «| ; a 3 ; Z k _ �`�. = cn // 12 ( a \ / ,E 2 rt E in 0 \ _ (a \ \ k \ ` \ , 2 . .;w§ § G „ w . . \ 0 �(,! 9 7 \ 0 !r R - \ co _g. 6 \§ ƒ csJ it 0 \ © ` 2 !§{ !; 2 w - i }} \ ,T. _. ` § O Z ,; [ c \ Ln . C . $ £ $ 2 -- g \ 0 \ z 3 .. co O. f cn \ ]aE° 3 e ecu \ \ \-} i �f \ )§ t) \ \ \/ { C !| U , , 8Q �! . !; ; 7t c.'5 ;! 8, �, - .- �. , in � � ?o1 ! �� ���� §2 �!. 8 : a \ _ - . . \ .. CO \ } \ z: CV 0 n d in 8 , 2i 4444=moo UcAi Oilfield Services,Alaska Schlumberger Drilling & Measurements Schlumberger 6411 A Street Anchorage, AK 99518 Tel (907)273-1700 March 04, 2015 Andrea Lazzari Spy Island SP04-SE5L1 (P2) ENI Petroleum Doyon 15 Close Approach Analysis We have examined the potential intersections of subject well with all other potentially conflicting wells, according to the Schlumberger close approach anti-collision standards (S002 v5.2). Method of analysis: 1. A list of wells to be analyzed is created in SLB DOX drilling software. The list is created using in house procedures by evaluating the surface location of the subject well and scanning the AOGCC database list of all wells in the area. Wells are then loaded into the database using in house and AOGCC records. 2. Wells are analyzed using the SLB DOX Anti-collision module with major risk safety factors applied. Wells failing the surface anti-collision allowable deviation rule and/or wells having an oriented separation factor (OSF) less than 1.5 are noted as failing either minor or major risk criteria. Further analysis of those wells is subject to Schlumberger's exemption process. 3. All depths are relative to the planned well profile. Survey Program: MD From MD To EOU Freq Hole Size Casing Diameter Survey Tool Type (ft) (ft) (ft) (in) (In) 0.000 900.000 11100.000 16.000 13.375 SLB_NSG+SSHOT 900.000 2400.000 1:100.000 16.000 13.375 SLB 111WD+SAG 900.000 3177.749 11100.000 16.000 13.375 SLB A1WD+GMAG 3177.749 5730.000 1/100.000 12.250 9.625 SLB MMWD+SAG 3177.749 7100.000 1/100.000 12.250 9.625 SLB_I'1WD+GNIAG 7100.000 7425.000 1/`100.000 8.750 5.500 SLB MWD-INC_ONLY_FILLER 7425.000 8925.000 11100.000 8.750 5.500 SLB �1WD+SAG 7425.000 17377.367 1/100.000 8.750 5.500 SLB MWD+GMAC Survey Interval Production hole-1 per stand -93 ft Close Approach Analysis results: Under method (3), note: All wells pass the major risk. However, SP08-N7L1 is near the KOP Magnetic scanning shows potential interference from KOP 7100'md to 7425'md -±325'md. All data documenting these procedures is available for inspection at the Drilling & Measurements Directional Planning Center. Close Approach Drilling Aids to be provided: A traveling cylinder will be provided. Checked by: Scott DeLapp 03/04/2015 SP04-SE7L1 (P3)Anti-Collision Summary Report Analysis Date-24hr Time: March 04,2015-09:38 Analysis Method: Normal Plane Client: Eni Petroleum Reference Trajectory: SP04-SE7L1(P3)(Def Plan) Field: Nikaitchuq Depth Interval: Every 10.00 Measured Depth(ft) Structure: Spy Island Rule Set: O&M AntCollision Standard 500205.1/5.2 Slot: SPO4 Min Pts: All local minima indicated. Well: SP04-SE5 Version/Patch: 2.8.572.0 Borehole: SP04-SE5L1 Database I Project: IocalhostWrilling-Nikaitchuq 2.8 572 Scan MD Range: 7100.0007-17377.37ft Trajectory Error Model: ISCWSAO 3-D 95.000%Confidence 27955 sigma Offset Trajectories Summary Offset Selection Criteria Wellhead distance scan'. Restricted within 58387.87 ft Selection filters: Definitive Surveys-Definitive Plans-Definitive surveys exclude definitive plans -All Non-Def Surveys when no Def-Survey is set in a borehole-All Non-Def Plans when no Def-Plan is set in a borehole Offset Trajectory Separation Allow Sep. Controlling Reference Trajectory Risk Level Alert Status Ct-Ct(ft)I MAS(ft)I EOU(ft) Dev.(ft) Fact. Rule MD(R) I TVD(ft) Alert I Minor 1 Major SP04-SE5(P3)(Def Plan) � a J Fail Mal 1 86.44' 4987.46 4959.051 887E4 OSF1.50 7488.42 4071.23 MinPts 0.11 67.29 -45.16 -67.18 -003 OSF1.50 7110.00 4055.87 OSF<5.W OSF<1.50 OSF<1.W Ender Major 7.19 111.:,=41M -104.6 008 OSF1.50 7269.56 4064.61 MINPT-0-EO0 9.13 114.29 -67.4 ENIZE 0.10 OSF1.50 726.36 4065.58 MinPt-O-ADP 11.34 117.. =414:E -105.73 0.13 OSF150 7309.09 4066.48 MINPT-O-EOU 19.62 127.25 -65.--�. .�"c, 0.22 OSF1.50 7367.88 4068.71 MinPt-O-ADP 30.33 138.86 -62.4:ME:IIM 032 OSF1.50 7425.91 407027 MinPt-O-ADP MEE 205.51 -32.73 -100.83 0.76 OSF1.50 8698.87 4073.42 MinPt-CtCt 105.39 219.2 MESE=ME Ijjjjjjjjjjjjj2 OSF1.50 889862 4063.46 MinPts 105.43 211..IMMEIMM EWE OSF1.50 8918.71 4063.91 MinPts NEM 198.86 -2775 -93.63 0.79 OSF1.50 9368.81 4094.54 MinPt-CtCt 11111012 216.61 -40.12 -111.92 0.72 OSF1.50 10068.78 4039.90 MinPt-CtCt 105.08 218.77 -41.18 -113.0 MICE OSF1.50 10208.52 4086.57 MinPI-O-SF 105.24 219..:IIIIIIIIIII�.'• -113.81 0.72 OSF1.50 10238.47 406.04 MINPT-0-EOU 105.44 219.33 -41.1 =BEM 072 OSF1.50 10268.42 4055.52 MinN-0-ADP NEENE 235.67 -5142 -129.57 0.67 OSF1.50 1086858 4086.50 MinPt-CiCI Ijjjjjjjjajal 236.98 -52.28 -130.66 0.67 OSF1.50 10911.32 4086.38 MinPt-CtC1 1111111IM 270.63 -76.14 -165.94 0.58 OSF1.50 11748.37 4067.78 MinPt-C1CI 316.27 -106.57 -211.59 0.49 0561.50 13088.13 4092.57 MinPt-CtCt 10480 317.78 -107.42 -212.•c MEM OSF1.50 13177.94 4091.09 MinPt-O-SF 105.02 318.1 M. ,.- -213.15 0.49 OSF1.50 13217.85 4090.43 MINPT-O-EOU 105.13 318.31 -t07.-0 M'% 0.49 0567.50 13237.81 4090.10 MinP1-0-ADP MIME 371.41 -143.33 -26573 0.42 0561.50 14618.19 4103.91 MinPt-CtCt 105.03 375.08 -145.44 -270..:E OSF1.50 1467.6 4108.74 Min%-0-SF 105.39 375.•0 NM= -270.00 0.42 OSF1.50 14717.42 4110.81 MINPT-O-EOU 105.67 37634 -145.1=BM 0.42 OSF1.50 14735.16 411205 MinPt-0-ADP 109.70 398.31 -15625 -288.61 Ijjjjjjjjjjj• OSF1.50 15548.42 4124.11 MinPt-O-SF 104.69 430..c=IRE MI:CIEIZIE OSF1.50 15208.08 4108.30 MinPts lE 429.89 -182.33 -325.22 0.36 OSF1.50 16217.63 410760 605%-Clot ..',' 462.63 -202.501 -3563811 8.341 OSF1 50 17377.37 413417 MinPts SP08-N7(Def Survey) Warning Alert MEM 70.23 4101.1 4078.17. 9008 OSF1.50 7179.18 4059.25 MinPts 418273 7038 4135.59 4112.64 9109 05F1.50 7218.68 4061.17 MinPt-O-SF 4600.87 63.77 4540.62 4511.10 7792 OSF1.50 7450.01 407073 MinPt-0-SF 1801.84 143.55 1705.78 1658.9 18.96 OSF1.50 8513.36 4066.77 TD 121.02 96.01 56.66 25.011 190 OSF1.50 7108.75 4055.81 OSF<5.00 Enter Alert 111.19 90.79 50.31 20.1 1.841 OSF1.50 715265 4057.68 MinPt-0-SF 109.70 63.43 49.721 9.-GAJ 1.84 OSF1.50 716.96 4058.13 MinPI-0-ADP 107.34 86.371 49. 20.97 1.87 OSF1.50 7177.53 4063.14 MINPT-0-EOU 1 105.071 77.48 53.06 27.59 204 OSF1.50 7221.03 4061.92 MinPt-CtCt 173.05 72.72 124.21 100.331 3.63 OSF1.50 750064 4071.34 Min%-0-SF 33392 101.79 265.70 232.13 496 OSF1.50 783652 4069.62 0SFn5.00 Exit Alen 5P06-N7L1(Def Survey) Warning Alert I 70.24 4101.191 4078.1 90. OSF1.50 7179.18 4059.25 MinPts 418273 70.08 4135.59 4112. 91. OSF1.50 7218.63 4061.17 Min%-0-SF 4600.87 8977 4540.62 45111 77. OSF1.50 7450.01 4070.73 MinPt-0-SF 1801.84 143.55 1705.78 168.9 18.96 OSF1.50 8513.36 406677 TD 121.02 9601 56.6 25.01 190 OSF1.50 7108.75 4055.81 OSF6.00 Enter Alert 111.19 6.79 50.31 21 1.841 OSF1.50 7152.6 4057.68 Min%-O-SF 109.70 60.43 4972 20. ' 184 OSF1.50 7160.96 4058.13 Mi5Pt-0-ADP r107.34 86.371 49.40 ' 20.97 1.87 OSF1.50 7177.53 400.14 MINPT-O-EOU 1- 77 77.48 53.06 27.59 2.04 OSF1.50 7221.03 4061.92 hfnPt-CtCt 173.05 ' 72.72 124.21 16 c liZt OSF1.50 7500.64 4071.34 MinPI-0-SF 333.92 101.79 26570 232.13 4.96 05F1.50 783652 406.62 OSF-5.03 Exit Alert 5107-SE4(P3)(Def Plan) Warring And MEW 86.611 5063.381 5064 904 OSF1.50 7498.49 7498.49 4071.32 MinPts 1132.31 150.25 1031.73 982.34 11. OSF7 50 7508.37 4071.39 Min%-O-SF NEM 192.50 967.11 90352 860 OSF150 8462.67 4064.99 MinPf-C1CI 1095.55 26,391 95821 8901 804 OSF1.50 8662.57 4072.12 MinPts 1095.61 191''"'71 967 934 86'4'1 OSF1.50 8922.79 406.99 MinPts 18291 97298 91242 9.03 OSF1.50 990.81 4091.6 MinPt-CtCt 1095. 240.79 934.55 854.6 6.85 OSF1.50 1211293 4063.60 MinPt-CtCt MIME 277.69 939.6 817.70 594 OSF1.50 1319.97 4092.00 MinPt-CtCt • .ii C', 350.600 892.60 791.78 543 OSF1.50 13862.92 4083.31 MinPf-CICI 109645 39.84 876.15 766.61 5.03 OSF1.50 1460.19 4106.14 OSF<5.00 Enter Alert 1096,6 349.6 863.01 74683 4.71 OSF1.50 15213.60 4123.39 Min%-ClCt 1095. 391.20 834.04 70435 4.21.7 OSF1.50 16314.22 410295 MinPt-CtCt 1099.28 425.311 814.341 672.981 3.861 OSF1.50 17281 11 4131.6 MinPts SI02SE6(P3)(Def Plan) _,,t Warning Alert MEE 84.74 5046.61 5019.021 91 661 OSF1.50 7484.02 4071.19 Minns MEM 119.07 1145.44 116.16 15.58 OSF1.50 7190.9 4069.99 MinPt-CtCt 1226.15 121.i ME= 1104.58 15.27 OSF1.50 7228.76 4062.38 MINPT-0-E0U 1227.49 123.15 1144.•4=CR 15.09 OSF1.50 7250.72 4063.62 MinP1-0-ADP 1236.79 131.22 1148.•.MEM 14.26 OSF1.50 7327.27 4067.24 MinPt-0-ADP 126.81 162.57 1177.03 1123., 0551.50 7504.00 407136 MinP1-0-SF 1326.39 211.0c M.,IIIIIKIM OSF1.50 8918.23 406.90 MinPts 1310.94 394.14 104777 916.80 5.00 OSF1.50 15109.33 4123.17 067<5.00 Enter Alert • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) Page 1 of 3 Offset Trajectory Separation Allow Sep. Controlling Reference Trajectory Risk Level Alert Status Ct-Ct Iffl MAS(ft) EOU(ft) Dev.(ft) Fact. Rule MD(ft) I TVD(ft) Alert I Minor I Major 1305.24 48061 984.42 824.63 408 06E150 17377.37 4134.17 MinPts SP09-N9L1(P1)(Del Plan) Pan MEM 72 731 4107.431 408383 08.01 05F1.50 7179.26 4059.26 MinPts 4579.40 90.32 451855 4489.08 7767 OSF150 744152 407058 Mi1%-0-SF 2405.80 147.39 2306.91 2258.42`4.79 OSF1.50 750273 4071.35 Min%-0-SF 499.59 111.57 424.57 38801 6.81 05E1.50 8901.42 4089.89 Min%-0-SF 389.61 7264 332551 313.98 789 OSF1.50 8924.63 4081.02 MinPts 1 353.431 7105 30642 28238 763 OSF1.50 8947.37 408126 Min%-CtCt 356.24 60.24 302.09 275.98 6.78 OSF1.50 8946.6 409131 MINPT-0-EOU 361.22 86.63 302.83 274.59 6.36 OSF1.50 894.9.64 4(181.34 Min%-0-40P 423.90 11720 345.13 306.70 5494 OSF1.50 8964.47 4081.46 Min%-0-SF 894.66 146.64 796.2667� 748.01 925 OSF1.50 9011.62 408181 TD 1393.78 177 11OSF1.50 8924.09 409101 MinPts 161 1467 805.381 17757.111 9. 0SF7.50 9011.62 4061.81 MinPts SP09-N9(P1)(Del Plan) Pan �•"•', 72.71!7Z I '1'®.'.'r OSF1.50 7179.26 40E226 MinPts 4579.40 90.32 4518.55 4489..:j 0SF1.50 7441.52 4070.58 Min%-0-SF 2551.73 126.67 246.6 24254:MEM. OSF1.50 7131.35 4056.75 Min%-O-SF 2405.80 147.39 2306.91 2256.4•llllllllll t OSF1.50 750273 4071.35 Min%-O-SF 499.59 111.57 424.57 368.01 MOM 0SF7.50 8904.42 4090.89 Min%-0-SF 389.61 75...MEM MOE 789 0SF7.50 8924.63 4081.02 MinPts 353434 71.05 305.42 282.38 763 05F1.50 8941.37 4081.26 Min%-CICI 356.24 83.264 30209 275.98 6.78 OSF7.50 8946.55 4081.31 MINPT-0-E0U 361.22 86.63 30283 27459 6.36 05F7.50 8949.64 4061.34 Min%-0-ADP 423.90 117.20 345.13 306.70 5.491 OSF1.50 8964.47 4081.46 Min%-0-5F 894.66 146.64 796.26 748.01 9.25 05F1.50 9011.62 4081.81 TD 1393.78 177,074 1272141216.711 11.9 05F1.50 8924.(9 4081.01 MinPts 111 146791 8053[, 75711 9. 05F1.50 9011.62 408181 Min%s 5115-N8(P1)(Del Ran) Pan .11-120' 71.744 4074.2(11 3990.70 86.38 OSF1.50 7180.70 4059.36 Min%s 4574.12 93.28 451152 4480.87 74.51 OSF1.50 7465.10 4070.96 Ming-0-SF 659.38 105.95 588.33 553.42 943 OSF1.50 888381 4060.03 Min%-0-SF 572.05 88.64 51255 483.42 9.80 05F7.50 8889.90 4080.21 TD 7246.79 148.58 1147.33 109821 12. OSF1.50 7501.66 4071.34 Ming-0-SF 529.21 135.68 438.35 393. 5. OSF1.50 8752.19 4075.34 Min%-0-SF 459.93 102.69 391.07' 3572 678 OSF1.50 8817.11 4077.66 Min%-0-ADP 45254 93.74 389.62 35876 7.31 OSF1.50 882813 4078.06 MINPT-0-EOU 1 447.051 7643 394.36 36862 866 OSF1.50 8845.17 4078.67 M Pf-CtCt 565.97 8714 507.46 478.g 5 OSF1.50 8889.6 4060.21 Min%-0-SF SP12-SE3L1(Def Survey) Pan MOE 65.34 5219.8 5191.73 93.74 OSF1.50 7510.64 4071.40 Mins 2362.16 13171 2274.04 22304.5 2709 OSF150 741699 4070.07 MinPI-0-ADP 2386.70 144.60 2289.97 224209 24.94 OSF1.50 750656 4071.38 Min%-0-SF 220361 153.73 2100.79 204.9.88 2163 OSF1.50 8017.62 4066.99 Alin%-CICI 2204.21 755. Mal 204875 2139 OSF1.50 8087.62 4066.30 MINPT-0-EOU 2206.57 157.12 2100..MOM 21.18 OSF1.50 8147.60 4065.70 Min1:1-0-ADP M=IE 162.32 2097.11 2043.33 21.50 OSF1.50 831758 406401 Min%-CICI 2206.55 16. 2096 214152 2017 OSF1.50 8396.92 4063.70 MINPT-0-EOU 2207.76 166.44 266.4 2041. 21.01 05F7.50 8436.44 4064.29 M6%-0-ADP 221999 179.59 299. 2040. 1864 05F1.50 8755.75 407546 Mm%-0-ADP 223004 187.12 2104.96 242. 17964 05F1.50 8915.48 4080.85 Mm%-0-SF magiE 166.18 2130.99 2175.92 21.35 05F7.50 9315.24 4064.09 48n%-CICt 2242.24 166.731 2130.74 2175.50 20.28 05F1.50 9345.24 4084.32 MINPT-0-EOU main 171.81 2127.09 2170.15 1968 OSF1.50 9606.75 4088.17 59n%-CfCt 190.92 2093.97 2030.66 1754 OSF1.50 10435.35 4084.37 48n%-C1CI 2227.• 213.67 2084.28 2016.72 1642 0521.50 10915.34 4065 Min%-C1CI 2221.44 216.7:111111EME 2014.67 16.18 05F1.50 11025.32 4085.54 MINPT-0-EOU 2228.74 216.18 2084«M. c, 1553 OSF1.50 1135618 4083.13 Min%-0-ADP lllll 25140 2049.02 196555 13.27 OSF1.50 1251496 4091.60 I4n%-CfCt I8 25724 2042.21 1956.79 12.95 OSF1.50 12694.92 4093.77 Min%-CICI 2215.78 260.: �. ted, 1954.95 1279 OSF1.50 12804.84 4095.07 MINPT-0-E0U lllll 279.99 2032.17 1939.17 1193 OSF1.50 13384.75 4087.79 Min%-CtCt 1ZE 389.78 7914.54 1784.94 8.39 OSF1.50 16532.82 4106.64 Mln%-CtCt MOE 439.84 1882.954 1736.651 7.441 OSF1.50 17177.73 4129.01 MinPts SP12-SE3(Det Survey) Pass llllE 665 5219871 5191.731 93.7.4 OSF1.50 751064 407140 MinPts IMEZE4 105.35 232966 229487 3448 OSF1.50 721343 4061.46 Min%-CtCt 2400.43 106.1•MEM 2234.31 34.23 OSF1.50 7237.39 4062.88 MINPT-0-EOU 2400.79 106.62 2329. 3408 OSF1.50 7253.36 4063.77 Min%-0-ADP 2407.86 117..:MEM 229379 3110 OSF1.50 7360.42 4068.46 MINPT-O-E0U 2415.71 129.-:MEM 226.75 28.08 OSF1.50 7425.6 4070.27 MINPT-O-EOU 2421.05 13442 233011 1111= 27.19 OSF1.50 7456.34 4070.83 Ming-0-A0P 2427.30 14082 2333.09 2266.•:MM 05F7.50 7501.46 407134 Min%-0-SF MBE 147.15 2259.43 221071 24.19 OSF1.50 7802.87 4068.86 Min%-CtCt 2358.89 149.•: +=: . 2209.03 23.79 OSF1.50 7856.6 4068.50 MINPT-0-E0U 2359.04 150.09 2258.:8 MEM. 23.72 OSF1.50 786.22 4068.44 Min%-0-ADP 18397 2231.58 2170.58 19.29 OSF1.50 8766.27 4075.64 h6n%-CtCt 235691 191.411 2227.971 2164.511 18.54 OSF1.50 8916.55 4062.87 MinPts <�. 167.91 2242.30 218686 21.15 OSF1.50 908693 4082.38 Ming-CIC1 MEMIEE 173.6 2238.86 218124 20.43 OSF1.50 9356.87 4084.42 Min%-CICI EMU 189.84 2216.59 215384 1861 OSF1.50 10007.24 4090.10 Ming-CtC1 234410 191.•8i®: 215215 18.40 0571.50 10087.18 406.70 MINPT-0-805 234498 193.01 2215.• MOM 18.31 OSF1.50 10127.16 4088.00 Min%-0-ADP wEign 235.44 2154.12 2175.97 1478 OSF1 50 11585.35 4085.49 Min%-CtCt 2313.17 240.1.MEM 2073.07 1450 OSF1.50 11735.32 4087.59 MINPT-0-EOU 231474 241.99 2153..:�. 't-' 1440 OSF1.50 11795.29 4088.43 Minf-0-40P Ff 33346 207202 1961.20 1035 OSF1.50 1449240 4095.16 Min%-CtCt 229250 336.8 Man 1958.95 10.26 OSF1.50 14582.02 4101.39 MINPT-0-E0U 2296.34 337.58 2070.-:llllll( 1023 OSF1.50 14611.97 4103.47 Min%-O-ADP XE 414.99 2022.19 1884.19 8.33 OSF1.50 76752.67 4115.90 Min%-CtCt 2300.71 425.45 2016.75 187526 8.13 05F1.50 17038.29 4125.40 Min191-CtC1 2301.09 455 001 1996.971 1845.41 754 OSF1.50 17168.73 4128.77 Min%s SP01-SE7L7(P1)(Def Plan) Pass j 8549451 49169 887 OSF1.50 7480.95 4071.16 MinPts MM. 272 2237.2 21458 132 OSF1.50 7680.43 4070.06 MinPts MEM 27864 2211.83 2119.36 1296 OSF1.50 8213.26 406.05 Mln%-CtCt 2401.96 301.584 226.501 2100.391 11.94 OSF1.50 891626 4080.6 MinPts MMIM 26697 2210.23 2174.98 1260 OSF1.50 896.16 4081.61 MInPI-CtCt 240218 296.461 2204.141 2105.731 12.24 OSF1.50 9324.89 4084.17 MinPts • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) Page 2 of 3 0 Onset Trajectory Separation Allow Sep. Controlling Reference Trajectory Risk Level Alert Status Ct-Ct(ft), MAS(ft)I EOU(ft) Dev.(ft) Fact. Rule MD(ft) I TVD(tt) Alert I Minor I Major 2402.40 291.82 2211.58 2116.78 12.66 OSF1.50 985415 4091.93 MinPt-CICI 2401.41 317.19 2189.55 2064.22 11.39 OSF1.50 11744.44 4067.72 MinPl-CICI 2401.79 343.79 217218 2057.99 10.51 OSF1.50 12912.43 4095.45 58nPt-C1CI 2401.13 367.26 2155.88 2033.87 9.83 OSF1.50 13811.62 4083.64 Min%-CtCt 2400.46 365.89 2136.13 2004.57 9.12 OSF1.50 14855.13 411985 MinPt-CICI 2400.68 427.96 2114.97 1972.72 8.43 OSF1.50 15902.84 412467 MinPt-CICt 2403.39 457.32 2095.10 1943.07 7.89 OSF1.50 16831.86 4119.24 TO 1- 8� 109.05�a 2335.75 2299.81 33.49 00F1.50 7189.08 405991 Min%-CICI 2409.88 111.7q 2334 2298.12 3269 OSF1.50 7223.28 4062.06 MINPT-O-EOU 2411.00 11713 2335.1 2297871 32.30 OSF1.50 7238.46 4062.94 M1nPI-0-ADP 11111EME 274.89 2236.11 2144.89 1326 OSF1.50 7581.76 4071.29 58nPl-CICI 2419.79 274.91 Ill --T'- 13.26 OSF1.50 7585.54 4071.26 MinPls 241988 274.92 2236.19 2144.•4=INI . OSF1.50 7589.33 4071.22 MinPt-O-SF SP01-8E7(P3)(Oaf PM) � Pre 86.771 88.731 OSF1 50 4071.16 MinPts 25277 160.50 2415.37 42362. 2375 OSF1.50 7787.14 4068.98 66r91t-0-ADP 2522.68 160.381 2415.36 2362.30 23.76 OSF1.50 781247 4066.78 MINPT-0-EOU MIEME 160.38 2415.36 2362.33 2376 OSF1.50 781341 4068.78 Min%-CICI �r 17034 2391.59 2335.21 2221 OSF1.50 8196,48 4065.22 Min101-CICI 250651 211.: M- -T-'-IIII=M OSF1.50 892012 4080.94 MinPts 2506.38 196.ry IIIIME IISME1 MIME OSF1.50 9099.17 4082.47 MinPlo MIME 186.13 2381.84 2321.20 2032 OSF1.50 9179.16 408307 MinPt-CICI M'4 20438 2366.81 2302.10 18.50 OSF1.50 9868.00 4091.99 MinPI-CICI IMETM 278.89 2319.62 2227.06 13.53 OSF1.50 12227.80 409.72 MinP1-0101 2505.•: 292.90 2310.31 2213.08 12.88 OSF1.50 12638.29 4093.10 MinPt-CIC1 I.= 314.05 228611 2191.84 1201 OSF1.50 1322706 4093.28 M1nPI-C1Ct 2505.,: 412.07 2229.95 283.00 9.14 OSF1.50 15908.10 4124.62 MinPt-C1C1 250542 446.33 220746 2159.09 8.44 OSF1.50 16850.18 4119.99 TD 2408. 108.97 2335.60 2299.89 33.52 OSF1.50 718906 405091 Min111-CICI 240988 111.861 2336.07 2298.2) 3271 OSF1.50 7223.28 406.206 MINPT-O-EOU 2411.06 113.05 2335.-`•"4/ 2297.96 32.33 OSF1.50 7238.46 406294 Min%-O-ADP 2495.74 157.81 2390.12 2337.93 23.91 OSF1.50 750333 407136 MinP1-0-SF 2528.41 161.38 242042 236703 23`5-/J OSF1.50 7615.33 407091 MinPr-0-SF 0P0006P92(Def Survey) Pass 0P0006L1(Del Survey) Pass OP05-06P01(Det Survey) Pass OP05-06(Det Surrey) Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) Page 3 of 3 Traveling Cylinder Plot NoGo Region EOU's based on:Oriented EOU Dimension TRAVELING CYLINDER PLOT _.sr..,A, NoGo Region Anti-Collision rule used Minor Risk-Separation Factor Client Eni Petroleum Field Nikaitchuq Structure Spy Island Well SP04-SE5 North Borehole SP04-SE5L1 350 0 10 Date 04-Mar-2015 340 150 20 330 1• 40 30 130 -----1---......„..... 320 120 - ' 40 110 '.""�`-R.., 310 100 w�__ /�'�\ 50 90 SP04-SE5 �. � ` 300 80 e 60 70 60 �s 290 ,�'' 70 titt 5• 0 ) \ o 4• 0 oz 7728 r 280 30 80 ie. ° �isz e 20 0 �3�i ..t'• 1 s 1 °7•m 270 --- p , ' 90 cn �� Al Or t\ 8 f75 � �, °'zzs 260 O , �li `�•`; 100 250 of Ira ��4 �lbw_ _.�� 110 c. 240 , ''.1 "0106 . _-V 120 ,410111. 2304/. ` 130 220A#���� 140 210 �////jam-`'S0'8-N7L1 200 7dA�s-_ 160 190 180 170 Well Ticks Type: MD on SP04-SE7L1 (P3) Calculation Method: Normal Plane Ring Interval 10.00 ft Azimuth Interval: 10.00 deg Start Depth: 7100.00 ft End Depth: 17380.00 ft Offset Well Count: 16 Attachment 3 Drilling Hazards Summary Drilling Hazards Summary 8-3/4'` Open Hole / 5-1/2" Liner Interval Hazard Risk Level Mitigation Strategy Abnormal Reservoir Low Stripping drills, shut-in drills, increased mud Pressure weight. Stuck Pipe Low Good hole cleaning,PWD tools,hole opener runs, decreased mud weight Lost Circulation Low Reduced pump rates, mud rheology, LCM Hole Swabbing on Trips Moderate Trip speeds,proper hole filling(use of trip sheets),pumping out, backreaming Drilling Hazards Summary 7/9/2014 11:58:00 AM Attachment 4 BOP & Diverter Configuration •A 01 .:.; 15 . og i N U w • :O :'O;: :O z e gm g QYooa i 7 - 4 <°mac o ' z a z 0 i O' :0 0, 1�i S O m O Z R Y U QI Q] F Q N h a rp N , a 0 1 g g 0 El 1 i toW ,\ _ S OA 0 F �/ CON, ^ 1_ a W S 8�Z _ 5 It 11gyp ! 1: fl 1 1 1; 1- h 1 I is hal I Eall . IIII ■n I � �I .-1----s—. " p iL i w , ------ a --------'11 I iIui - past— - - - V p I IP 1 E AI�` I j 1 g 1 1 C gi eiliHM11-- i 1 s g-g- ag !i b _.„, , l 21NNINNI,NANINNNNN.-D.- .- O - O. 0.-000 OLOO�OLOOOfO( O2 gi_ Mam=CWmOWWOa� MMa � Fi a ¢ � g ` ;s, S° - C. ad a &bi E W5 8 'La m -NMaWr,MM -Nna CONOOM .-NMatONMM ,-NMaWNW* FNM €0 75,,t, ng N_MMMMpiMMMM^aa**41-4 v*_NNiAi()yjooul Nbvocouaocatowto_nr..N ' K' 22 30 h go : N N m t0 ll Cg 2 W O )OuOa,,,OamamamvmWvdmamamam4WMWMWt0 MWMW WMWMINNNN-N € fM —.NMMNuutOD1m00 - - MMau)u1u WWa5m00-.- MN0 • t< ta.tad,1-4- a.4-Lo oaliiuitodiuouiuvvnniotococoototOto L a •o a v--8 a0t01,Wm -NMa WtOQ)Wm — Mau)tOnWm —NM au1 tD1 00 m. 7NMa WtD (I 3 mla O6OJO60000000666666666F°00000000 12NNNNNNNN kg a iu ti +< i a a F • • J • O - —" ..\\%____ C Y S w m N gL F. N 2 • O •OIEIO 1 F \_�' 4. W- II CC W.I-\ 0)- M CO N Q 0 t wd › C it 0 J.._4 Pi .7.,..,. 9 riT tit 411M V 1 O 0 "gtLL m 1117111111 -, :bi r abi,. Tel ° @ IP CI o, 116.. (- ,.0 Plii......_ Ak Mk kj 7111 ilk11\101 V Illioit:Iii V• a) _ 1111k * 9 a` o • sem"` 1111111 0 0 (9 IV' 0 - . rill e 0 . . 4..... .41 r_ w T 3 . GI 1140 to 1— c Q 2 g > 4) viva > cucl) 7� (n 0 0 u z , 4- n ._ o CI a.) a) > o ix Ts 0 •� E Y y C = o U r J t� ° M W al >, c >, o ! (.9 I Tu' c z (7) si.NI 42 co �a - m - io W Z LU � � �° _ �° � LiZ ai in T r I Jro Q ciIk C7 N C7 ❑ co sk- 2E Q m 0 °' a,..,?-4 ,n, Cit ED y r 1 isi _ , i�bptrltr !!!!!! 00460000000000010,00,11bbbbbbbbbsigg000g0g00..0g0ggggggggtit:,bbbbbbbbbb eeaeaagggiggeaeaeaaaeae trbbbbbbbtrbbbbtrbtrtrbltx1110. § i 111f611 Stigill! aq�ifd6iE�666C � �i � E'- 6s9d 1 €� � aii !!!!!!!!!1!!!!R!mita4! NygC O/11111111111011M-g E€E66 illi f fit gi6s_ig _ iitiiiii EV, 5a w 1 iiig d y Cz QS5itr r 9 ii wripgn 11511 is<�� 1111 I mg: 2 /I/I'll r 1111 II! tNff a ill 111111111111 1 1 p !lg iii 1111111������iiiUE 'c kUglo =a 11,1111111 IflIfflIiIifflIIIII1hIffl I........ d g of ro'g itti111iIIIlillijlljillllittlliit�lIflIC1111111.1N las g d iS 6, m - , W a i. z lea ill A ; g gl I i 14- 0 pg I iirZ n -� tl 2 N _ i_ V t O ?W 2x rd � 0000 QW W§11 i Owl 9U eV �Po q Q — R�yE�g'c`yR�yER E .m O O My E' o f ZSE � EE 011 /41 N H Lig ' '*''4'4'44 /.. .. N2 gt 4444c14550 OA e.'^ �o - $ R �r-I-T t p S � � q`Wg "'" ' / /lj'' r n A-AO.----,Z— -1-/ --'1< -i1R161n mAW01701 max- -`C'''am- -- ---- v r jj\\� c c ... \\` �1 14/ � `/\ } pppF `YY�01 ®888 , \ m_ \ L I -� ®®-o4- 11,,,\/\//\\/I i 8881888 Y�/C ' 99�`�%y ....,..,..1...o= 13 \ \ { L tr5 i t " /.k/V% I� L ��I tt tIt tt .""--1-- - — F'} `iti- }_ A-.009 ' II , o it ' [lel 5A i4•140.171,:g ! R 1 ffeeseeee *I* R O il %� o �� - • :1411:16-: _ N / ] •'•Iii 16 s ,1710 ,::\ ii i 'd c) 1. Esau $�♦ m \\ Sig ffefi~N 1 i �7 811 _i____ -�\1��A 111- •0-.008 _II-41 4 Is.J_ �._}_ __}_ __ .0-.002 0 Wwq o � s/ / & iI jam® I1 .0 7 ►`. n T —17 _I o \\ tow -- Ci I ami°'�- LI_-. i•IFc__o �4741M� s,uAw s \\ 1 I ?WIZ AMMO Xd IAMMAtl. R- / onassvocnerea 11A\Oli 0 \\ i__ . n b h I ' 000 z \ wwal / 2� \ s'- _.,_ ".-_, S �`:�. .le ' dg oF "k' Ar I , \ I I f I w qn z Rei 2 2 Z .2-.20 'I i b Attachment 6 FIT & LOT Procedure ENI S.p.A. SPEO IDENTIFICATION CODE PAG 206 OF 338 Eni E&P Division REVISION STAP-P-1-M-6140 0 1 15. LEAK OFF TEST PROCEDURE A Leak-Off Test (LOT) will be performed On Wild-Cat wells at each casing shoe after setting the surface casing. LOTs are also recommended to be carried out on both appraisal and development wells. Leak Off Test and Formation Integrity Test (FIT), also termed the Limit Test, are for formation strength pressure tests made just below the casing seat prior to drilling ahead. These tests are carried out to: • Investigate the cement seal around the casing shoe which should be at least as high as the predicted fracture pressure for the area. • Investigate the wellbore capability to withstand pressures below the casing shoe in order to allow proper well planning with regard to the setting depth of the next casing, mud weights and alternatives during well control operations. • Collect regional information on formation strengths and stress magnitude for different applications including optimisation of future well planning, hole stability analysis and modelling, reservoir application. Prior to a test, a decision should be made to either increase the pressure until leak off occurs (as in the LOT) or to stop at a predetermined pressure for a (FIT). It should be noted that: • FIT does not obtain information on stress magnitude. • A LOT is designed and should be performed to determine, in a better way, the desired data without breaking down the formation. When a Formation Integrity Test is required, the maximum pumping pressure is often expressed in terms of`Equivalent Mud Weight' (EMW): Imperial units EMW = +MW 0.052 x TVD where: P = Pumping Pressure (psi) TVD = True Vertical Depth (ft) MW = Actual Mud Weight(PPG) Metric units EMW = P x 10 + MW TVD where: P = Pumping Pressure (kg/cm2) TVD = True Vertical Depth (m) MW = Actual Mud Weight (kg/I). SP Eo IDENTIFICATION CODE PAG 207 OF 338 ENI S.p.A. Eni E&P Division REVISION STAP-P-1-M-6140 0 1 LOTts or FITs can be carried out in any open hole section and at any time while drilling the hole, even if it is customary to have it performed some metres (6-15 metres) below the casing. For instance, the casing seat can be in a shale and the first sand formation may be encountered several hundred feet deeper. This will certainly be more permeable than the shale, and a test can be performed to ascertain the maximum pressure this sand can hold. If it is lower than the shale just below the casing seat, this sand becomes the limiting factor. Note Information obtained from leak-off tests in straight holes is not applicable to deviated holes in the same field and vice versa. 15.1 TEST PROCEDURE Prior to performing a formation strength test, prepare a sheet of graph paper to record pressure, versus cumulative mud volume. 1) Drill out the float equipment, clean the rat hole and drill 5m of new hole. 2) Circulate a mud quantity equal to the internal string volume plus the new hole plus 50m internal casing volumes. This mud shall be cleaned and conditioned to the density and filtrate as indicated in the Mud Programme to be used for the next drilling phase. 3) Pull the bit back into the casing shoe. 4) Rig up the cementing unit to the drill pipe. The unit shall be equipped with high precision, low pressure gauges. The range of the pressure gauge shall be selected based on the actual mud weight and the estimated (LOT) or predetermined (FIT)pressure. A pressure recorder should be used during the test. The use of the rig pumps for making these tests is unsuitable. 5) Fill and test the lines with mud. 6) Break circulation with the cementing unit to make sure that the bit nozzles are clear. Stop pumping when circulation is established. 7) Close the top pipe rams or the annular. 8) In surface well head both flanged and multistage wellheads, open the annulus of the previous casings. In sub sea well head pay attention to not excide the burst pressure of the previous casing. 9) Pump slowly and in continuous way, until pressure builds up to approximately half the anticipated maximum surface pressure. 10) Once pressure is established, pump uniform volumes of mud and wait for the time required for the pressure to stabilise. The flow rate range is from 1/8 bbl/min (20 1/min) up to a maximum of 1 bbl/min (160 I/min), however values of 0.25 bbl (121/4" and smaller holes) or 0.50 bbl (171/2" hole) are commonly used. 11) Note the cumulative mud volume pumped, the final pumping and final static pressure. 12) Repeat steps (9) and (10) above and plot pressure versus cumulative mud volume for each increment of pumped volume. ENI S.p.A. SPEO IDENTIFICATION CODE PAG 208 OF 338 Cl 111 E&P Division REVISION STAP-P-1-M-6140 0 1 13) Continue this procedure until: • Two or three points on the plot are reached where the pressure deviates and falls below the approximate straight line (or if the pressure does not increase with the injected volume). The point on the plot where the curve begins to bend away from the straight line is called Leak Off Point (Refer to Figure 15-1) • Or the predetermined test pressure is reached. 14) Stop pumping, shut in the well, record and plot pressure versus time until stabilisation (usually it takes 15-20min). In the early stage (2-3min) one value every 15-30sec should be collected while for the remaining a value of pressure every 30- 60sec may be sufficient. The use of PACR or an equivalent device, if available, is preferred. 15) Bleed off the pressure and record the quantity of fluid returned into the cementing unit. Compare it to the volume used for the test to obtain the amount of fluid lost to the formation. 16) Open the BOP and calculate the formation strength in terms of `Equivalent Mud Weight' using the lowest between leak off point pressure and stabilised pressure. 17) Collect the data recorded during the test in a data sheet together with the following information: borehole diameter, depth of test, depth and type of the last casing, mud density, plastic viscosity, filtrate and gels (refer to the example on the next page). Note: The LOT pressure doesn't exceed the pressure which the casing was tested. Note: When a good zonal isolation behind the casing is imperative, the Leak- off test should be carried out with a retrievable packer to avoid pressurising the casing which may cause possible permanent damage to the cement bond by the creation of micro annuli in the cement. Note: The pumping rate should be kept within the limits described in step 9). If the rate is too low, filtration losses will mask any leakage loss, or, if the rate is too high the formation may suddenly break and the leak off pressure will not be determined. Also, the longer the open hole section, the higher should be the injection rate. If the initial pumping rate is not sufficient, the well should be depressurized and the test restarted with a higher rate. Note: If a float valve is used in the drilling string, the test can not be carried out by pumping down the drill pipe. In this case rig up the cementing unit to the choke or kill line, fill and test the lines against the fail-safe and establish circulation through the riser. Close the BOP and perform the formation strength test pumping down the annulus. J""tS P E 0 IDENTIFICATION CODE PAG 209 OF 338 ENI S.p.A. Elni E&P Division REVISION STAP-P-1-M-6140 0 1 ifigk LEAK-OFF TEST REPORT ReportN° Date: WELL NAME: WELL CODE: CONTRACTOR: RIG NAME: RIG CODE: _Open hole depth(m): 825 Mud Type: FWGELS Rig type: J.UPs Hole DI amete r(in): 121/4 Weight(KgA): 1.3 R.K.B.elevation(m): 26 Last Csg.Shoe(m): 797 Marsh Uscosity(sec/Ot): 44 Water Depth(m): 24 Csg.diameter(in): 13'3/8 P.V(cps): 19 Pumps: 12-P-160 Grade: J-56 Y.P.(1b/100le): 5 Liners On): 6.5" Weight(b/t): 61 Gels(lb/100 5': 2B Flow Rate(bpl): 0.25 _Mao.Burst pres(psi): 3103 W.L(ccAO ruin): 10.5 Litholog y Shale Expected EMW 1.68 KgIcm2/10 m Time Vol Lrne Pressure Time Volume Pressure Time Vdurne Pressure (min) (bt1) (Psi) (min) (bbl) (Psi) (min) (bbl) (Psi) 1 025 50 9 2 490 16 2 435 2 050 100 95 2 480 • 3 0.75 200 10 2 470 4 100 300 10.5 2 483 5 125 400 11 2 455 6 150 500 11.5 2 450 7 175 570 12 2 445 8 2D0 600 13 2 440 _ 8 290 550 14 2 437 - _ _ 8.5 2 D 0 505 15 2 435 Nde: Pumped with a constant low rate of gib!): Volume pumped(bbl): Volume returned(bbl): . (psi) 1000 • 900 - 800 - dot)pump r 700 e 600 . shut in curve S 500 ., . ti S _~�� - —.-11--• • • • U 400 r B minutes e 300 200 100 0 .. 0 0,25 0,5 0,75 1 1,25 1,5 1,75 / 1 2 3 4 5 6 7 6 9 10 11 12 Cumulative Volume MIA) 4 IP Time mins RESULTS: (Press..,,,i+Press.Lci.)x1 OiDepth=[(1.3 x 797 110)+(430 x 0.07)]x10 1797=1.68(Kg/cm2/1 O m) Note. I Company RepreseMat w Figure 15-1 - Leak-Off Test Report Attachment 7 Surface Platt REV DATE BY GK , APP DESCRIPTION _REV DATE BY CK APP DESCRIPTION 0 10/01/10 OHS CC CC ,HZICI Drcwing VICINITY MAP SCA z•I: '' •-,.• 2 MiIes 15 1 [t la :, 'b 1 ' 1,) .„ 11 _, ........_ _... •qi, 21 2N 2.5 "A 19 20 21 ,.. 21 22 23 .4 26 25 30 29 2B SURVEY 25 30 29 26 2 i . . ---cd u--;----- co co It)/ A.S.P. NAD83, Z4. 55. :c . 3I 32 T14N T14N T13N I T13N . .'. , )1.11(T0K 5 2 1 5 4 . . DUKT6(POI T PAO!: DOCK 1 - , IC A :.,' 1G )1 v .• 2 # 4 .,•* i - , 1 ' K-sik-.9s I, — 'A r I/- -,- a occ:>•1_, ' . r /N• j mnip NI DO i, ,'.1C'--- -."-- al le 15 14 ix i i / ''' , '' 13 —3'' '--------• • .•, 4) ' Dih30 ir a ci Iii\ ,, 21 22 23 0 r, \.•- , t-5, mi e SI s) lo to \ ,. . .„ ..:.,„ . 1 , „ in, .. , 05-314 ' (9 a \I / n• k . MAP PAO DS i kJ i . 28 27 a 2t 30 20 a . .leo - I 0 ----Q- . ,....., . .,.... rr-2 % Ng..." j ?tm . 0 ot ? ; G P .1 %EST I/Ot le •—.o, 111111Alplirliirs r, '-' if u m \N :, aN NJ . ,. }, m i , i )0 . D nr DRAWING NOTES: 1. GRID COORDINATES SHOWN ARE ALAKA STATE PLANE, ZONE 4, NAD83. DISTANCES SHOWN ARE TRUE HORIZONTAL DISTANCES. 2. GEODETIC COORDINATES SHOWN ARE NAD83. 3, BASIS OF LOCATION DERIVED FROM CPS STATIC OBS. PROCESSED INTO OPUS SOLUTIONS. 4. CONDUCTORS ARE LOCATED WITHIN PROTRACTED SECTION 19, TOWNSHIP 14 NORTH, RANGE 9 EAST. UMIAT MERIDIAN. 5. ELEVATIONS SHOWN ARE B.P.M.S.L. DATUM. 6. ALL SECTIONS SHOWN AND/OR REFERENCED IN THIS DRAWING ARE 'PROTRACTED SECTIONS'. 7. REFERENCE LOUNSBURY DOCUMENT E-087 FOR COORDINATE VALUES IN NA027. vokialmmikaiii 4.•ts.,.. ,. OF ...p. . .", ,;(, 4... . , zc,.... • SURVEYOR'S CERTIFICATEII 4 i 0 : 49th I\ % • • : 1 • • _ - . g I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND 0 r . , d LICENSED TO PRACTICE LAND SURVEYING IN PIE STATE OF 0IL ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY vg, : ... '. .. e. : .0 0 r" '• FRANCIS J, CORNING I i• DONE BY ME OR UNDER MY DIRECT SUPERVISION AND 1 0 : . -k-P ** LS-10685 i ar THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT • ". ..• *. AI AS OF OCTOBER 01, 2010 .,(i.."P,.'0, k C)/4-/ZO I 9.• c, 411P 0 CO ....... ..... 44 ii)0 ..... \j'• •4? Ott rtSstorlt+k-440- itlitsivalli' .1i* SPY ISLAND DRILL SITE WELL CONDUCTORS • ISt*: 1/ AS-BUILT LOCATIONS @n1 11 CAD FILE:ENI3543D9 US operating um, DRAWING NO: PART: REV 10/01/2010 Eni-3543—d9 1 OF 3 0 REV DATE BY CX APP DESCRIPTION REV DATE BY CI( APP DESCRIPTION 0 10/D'./'.D D+'S CC CC . c D cwir•g N eco 449,:n° zc. 18r Ser. 1 \� J eg, �; Se;. %'p � w A.S.P. NAD63, 7<. � -+ � 000000 J CP W 0 N N W N ID , CA 1,3 N r N O LA 1 w- p ("I tL NNoa N Nv 00 ul 41 164 41 N co DETAIL A. SCALE: 1"-B0' SANDBAG TOE GRA\1Et_SHER OULD 0 oa c v owe° as 0o ao°°°° 44 G ° y 6 DETA,L A vP SPY ISLAND DRILL SITE (SID) GRAVLL SHOoIOE' SANDBAG 10E' LEGEND SCALE 200 0 '00 200 0 = WELL CONDUCTOR AS-BUILT THIS SURVEY 1" = 200' Iiiiikt 4,0 8148800 SPY ISLAND DRILL SITE 4' �y WELL CONDUCTORS 2n•• • 4,„A# AS-BUILT LOCATIONS ,././1.0. CAD FILE:ENi354309 us Opefra Aril DATE0/01/2010 DRAWING NO: Eni-3543—d9 PA2:OF 3 REO REV DATE BY CK , APP DESCRIPTION REV DATE BY , CK APP DESCRIPTION ,.t- - Ci .,5 Protracted Section 19, T. 14 N., R. 9 E., Umiat Meridian Alaska State Plane, NAD83 GRID NAD83 Geographic Section Line Offset Pad Well No. I 'Y' 'X' Latitude (N) Longitude (W) F.N.L F.E.L Elev. (US ft.) (US ft.) 1 6053423.20 1651769.82 70033'27.209" 149054'24.765" 797 1171 12.4 2 6053421.65 1651761.87 70033'27.194" 149054'25.000" 798 1179 12.4 3 6053420.07 1651754.10 70033'27.179" 149054'25.229" 800 1186 12.4 4 6053418.56 1651746,17 70033127.164" 149054'25.463" 801 1194 12.4 5 6053417.03 1651738.44 70°33'27.149" 149054'25.692" 803 1202 12.4 6 6053415.54 1651730.54 70°33'27.134" 149054'25.925" 804 1210 12.4 7 6053412.44 1651714.77 70033'27.104" 149054'26.391" 807 1226 12.4 8 6053410.91 1651706.96 70°33'27.089" 149°54126.622" 809 1234 12.4 9 6053409.39 1651699.11 70033'27.074" 149054'26.853" 810 1241 12.4 10 6053407.94 1651691.31 70033'27.060" 149°54'27.084" 812 1249 12.4 11 6053406.32 1651683.39 70033'27.044" 149054'27.318" 813 1257 12.4 12 6053404.80 1651675.51 70033'27.029" 149054'27.551" 815 1265 12.4 13 6053400.38 1651652.80 70033'26.986" 149054'28.221" 819 1288 12.4 14 6053398.83 1651644.95 70033'26.971" 1.49054'28.453" 821 1296 12.4 15 6053397.31 1651637.12 70033'26.956" 149054'28.685" 822 1304 12.4 16 6053395.82 1651629.26 70033'26.942" 149054128.917" 824 1311 12.4 17 6053394.32 1651621.47 70033126.927" 149°54'29.147" 825 1319 12.4 18 6053392.78 1651613.58 70033'26.912" 149054'29.380" 827 1327 12.4 19 6053389.63 1651597.90 70°33'26.881" 149054'29.843" 830 1343 12.4 20 6053388.17 1651590.00 70033'26.867" 149054'30.076" 831 1351 12.4 21 6053386.60 1651582.24 70033'26.852" 149054'30.306" 833 1358 12.4 22 6053385.19 1651574.35 70033'26.838" 149054'30.538" 834 1366 12.4 23 6053383.64 1651566.41 70033'26.823" 149054'30.773" 836 1374 12.4 24 6053382.12 1651558.61 70033'26.808" 149054'31.003" 837 1382 12.4 25 6053377.65 1651535.94 70033'26.764" 149054'31.673" 842 1405 12.4 26 6053376.14 1651528.13 70033'26.750" 149054'31.904" 843 1413 12.4 27 6053374.53 1651520.23 70033'26.734" 149054'32.137" 845 1421 12.4 28 6053373.11 1651512.46 70033'26.720" 149054'32.366" 846 1428 12.4 29 6053371.56 1651504.49 70033'26.705" 149054'32.602" 848 _ 1436 12.4 30 6053370.06 1651496.66 70033'26.690" 149054'32.833" 849 1444 12.4 31 6053367.05 1651480.97 70033'26.661" 149054'33.296" 852 1460 12.4 32 6053365.47 1651473.16 70033'26.646" 149054'33.527" 854 1468 12.4 33 6053363.93 1651465.22 70033'26.631" 149054'33.762" 855 1476 12.4 34 6053362.44 1651457.37 70033'26.616" 149054'33.993" 857 1483 12.4 35 6053360.91 1651449.52 70033'26.601" 149054'34.225" 858 1491 12.4 36 6053359.33 1651441.62 70033'26.586" 149054'34.459" 860 1499 12.4 37 6053356.19 1651425.30 70033'26.555" 149054'34.941" 863 1516 12.4 38 6053354.74 1651417.32 70033'26.541" 149054'35.177" 864 1524 12.4 orriltil Q�SO�Q'9(• cT SPY ISLAND DRILL SITE • WELL CONDUCTORS 't �A AS-BUILT LOCATIONS PR 11 %,.ta ee CAD FILE:EN13543D9 I""1 �1 Op ratinc DATA:0/01/2010 DRAWING NO: Eni-3543--d9 PART: RE 3OF 3 0 a n o - o 1 7 m . m s o > 1 o 'L v > a a a a a a a a a a a a a a a a a a a a a a a a a a a a y . VO (0 a ( N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q Z w .1 'i e-i .1 .1 ri ri ri .1 ri ri 'i .1 .1 ei e•1 .1 .1 .1 .1 .1 .1 '1 r 1 .-Ir 1 ri ri (-1 06 .± T w 7 a C ' J '. .1 01 O a N 0 1D a a1 N VSr 01 1 CO00 1O . 01 N m 1 a. CO00 tN UI en a1 CO C N N 00 01 0 1 N M a a U1 10 00 01 0 e1 .-i N a U1 V1 LO N CO 0 -I N N J7 ,F W (/1 .1 .--I .11 N N. N N N N N N N N 01 rn m m m m 01 M m en Sr a a Sr O U. 2 .--1 1--1 .1 .1 e-I 1--1 11 .11-1 .--1 .-i .--I .1 r-I N N N N N ra I ei ,-I N 'i 1 aa1 1e--1ae 01 C J C o J u z 01 01 0 0 0 0 0 0 .1 .--1 e1 .--1 N NNN N m enn en m m M a a a a 0 • N N co co co m m 00 00 m 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 CO _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ j M 00 r4. .-I M 0 00 01 NI 0 a a 01 O 01 N U1 .1 N .1 N a a 00 .1 a cooO 0 a 0 m N N0 m l0 M 0 0 m N 01 l0 01 N V1 01 N 01 N N CO M 1D CO O M V1 O N a n 01 .--I CO O m LI) n O1 a l0 O1 .-i m l0 N V1 n O1 N M m M a a a V1 LA V1 1/1 V1 10 6 r� N N N r-4 00 00 00 01 01 01 O O O O -6 .-i .-i .-i .-i .1 .--I ,-1 .--I .1 .1 .1 .1 .1 a1 ei N N N N N N .1 N N N N N N 7 U :w a a a a a a a a a a a a a a a a a a a a a a a a a a a t E.0 0l1 u1 m m on v1 on an on in VI on on ort ort u1 Li) In on ol1 In u1 on ort v1 u1 Q. m m 01 01 m m m m 01 01 01 01 01 m m m 01 01 01 m m 01 01 01 m m 01 01 a a a a a a a a a a a a a a a a a a a a a a a a a a a a 00 .1 .1 11 .-i .--1 .--i .1 .--1 r-I r-I .-i a1 ei e-7 .1 .--I r-I .1 .--I .--1 e-1 e-1 .--I .--1 .--1 .--1 .--I .--I 0 W _ N - - - - - - - - - - - - - - - - - - - - - - - - - - - - N - lD a1 ID ei (0 ei .-I (0 ei N N N M 00 01 01 a01 01 a01 U1 0 m -1 N N . 00 < Z Cr N N OCO N . . ^-1 .ai Ni .-I 0 0 O O O 01 01 01 01 01 01 CO00 CO00 CO00 00 r N N Z (1 00 00 00 00 00 m m 00 00 00 m 00 00 00 N N N N N N N N N N N N N N m N N N N N N N N N N N N N N N N N N N N N N N N N N N N 7 r11 m (n M M m m cn m m m cn m M (n M M M M m m m m m m M m 17 m m m m 01 m m m m m m m m m m m M M M m M m m m m m m m m O O O O O O O O O O O O o O O O O O O O O O O O O O O O N r Q0 O N l0 O 00 a Sr N t0 N a1 O 01 O I/1 N l0 CO 01 .--I .--I a 10 N N V1 a s r� cc O 0 M m l0 N 01 .--I M V1 l0 l0 0 .--1 M a 10 N .1 N a u1 l0 00 .1 M a (O Z (9 01 e1 M U1 N 01 M (0 00 O N a N a (0 00 O N N 01 -i m V . 1 N 1l1 N 01 .1 - m M N e•-1 0 01 CO N (D l0 V1 a N r-I 0 01 01 00 LO U1 U1 a m N 0 01 00 CO N N N N N (0 (0 (0 (0 (0 ID (0 (0 (0 U1 11 LD V1 V1 V1 U1 U1 1 1A m U1 SI. a a J .1. 06 N Cl vi- e4 � .� , ,4 .4 .4 .4 . .4 .4 .4 .4 .4 .4 .4 ,4 . .4 .4 ,4 ,4 .4 . .1 .4 . ' ,-1 .--1 r-Ir-Ir-I ,-I �I-1 �‘-I �‘-I �1-11i .i .i I-11-.1r-I i J CI co Z m 1- � rr1 rrrr1- 1- < V1 U1 Ut VI til U1 l U1 U1 Ln 1n 1n 1n Vl Ut 1n 1n V1 V1 1n 1n 1n .n 1n 1n 1n 1n � M 0 a; Ce 0 < r= _ </' Z E. 00 M V1 at .-i e-I a O 00 M .-1 N O N 0 .1 N N N 1D 01 00 m r-IO a m M 0 N QL O V1 01 a Cil 01 M co N m N 00 N r\ N n N 10 M O a O V1 O V1 O Sr O w 0 f0 ei 01 (0 10 a a O 00 r\ 1n a N 00 ke Vi M N O n tD a m .-i O ut a N .1 O yr N (0 (0 (0 l0 l0 (0 V1 V1 V1 (0 V1 Sr a a a a a M M M M M M N N N N i Z V } m m m 1D (0 m 1D m m m m (0 m m m m m m m m m m m m m m m m < a in UI UI Vml Ill 1Mn` LII Vm1` Uml` mi U1 Vm1` Vm1 Vm1 U11 ni ni ni UI UU1 UU1 Vm1^ VI oi UI 1mn` 1mn` VI U11 ni UU1 1Ml1 VI LII UU1 M O o 0 0 0 o O o 0 0 0 0 0 0 o O O O O O O O O O O O O O J C - a (010 (0 (0 (0 (0 (0(0 ((0 (0 (010 (0 � � (0 (o (0 (0 (0 (o (0L (0 (0 (0 (0 N U 2, CU ll1 O O1 M N In '1 N fn v 00 '-I ci m l!1 n I, O frl l0 0 00 M fr1 fr1 v n l0 If 1i 'Y N 0 N v 01 m 01 LN0 000 0 m 1mn N v 10D m .a-I 00 COao 0 1mn N 0 1^O 0 .Mi m N a V1 V1 V1 V1 V1 (0 (0 (0 N N r` 00 00 m 00 01 01 01 O O O O .1 .-i .1 N N 13 N N N N N N N N N N N N N N N N N N N m m en m m m m m m Q 0 :,-. it Ui v a v :7 v a Ui Ui v v v v v v v v v v v v v v v v a t a on Vf of on Ln on tan ton Lf1 of ton U1 U1 U1 1n V1 V1 on V1 U1 U1 an V1 V1 U1 U1 V1 1n 0- C 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 0 a a a a a a a a a a a a a a a a a a a a a a a a a a a a .. r-I .-i 1--1 .1 .--I .-i .1 i 1 1 1 ra . e-I . e-1 e-I e•-1 e-1 r-I .--1 .--I .--I .--I .--1 r-I r-I r-I .--I .--1 1--1 CO0 ar _ . U, m 01 .7 O1 a of a s 01 a 0 a 01 O .-I O N N.N N .1 (0 iV m m 0o0 a 0 a 0 • Z 0 < N .. N i .I .. m0 -I .... .1 � O O O 0 O 01 01 01 004 01 01 00 00 00 CO 00 00 r\ N N N Z aJ N N N N N N N N N N N N 6 t0 6 O O (0 6 6 lD (0 6 lD O O (0 lD 13 N N N N N N N N N N N N N N N N N N N N N N N N N N N N 7 _ += cn (n e m (n M rn en m (r1 m en m m (r1 cn m m M (n cn M M M (n (n e e .1-• M m m m m m m m m m m m m m m m m m m m m m m m m m m m 0000000000000000000000000000 N. N N N N N N N N N N N N N N N N N N N N N N N N N N N C) N N 0 N Cr a N LD -I -1 Cl .--I 0 1n N 1O N CO 0 0 a U1 .1 .1 a m m (0 x 00 co .--1 N a 1n N. 01 .--1 M M In CO 01 .1 N a V1 01 0 N m Sr 1D 01 N N Sr .n l0 l0 V1 a M m .4 0 01 01 CO N U1 a m N N .mi Cl 01 CO N l0 V701 N NN .-1 X 0 M X N N N N N N N N ID LD 10 10 l0 10 O l0 O l0 V1 V1 V1 V1 U1 VI V1 V1 V1 V1 00 - ---- ---- ---- --i .4 .4 .-i .-i .-i .--1 .-i e-; .-i .-i ei N .-i N -i -i N .-i .-i .-i ( .-i .--1 .-i 0 0 V) V1 V1 Ui V1 V1 V1 V1 V1 V1 U1 M 1n U1 In 111 V7 VI U1 V1 V1 Vl Vl VI V1 V1 V1 V1 < Q 1D (0 1D 10 t0 t0 1D ID 1D (0 ID t0 (0 1D LD 1D 1D O 0D O 10 ID LD l0 LO 10 l0 l0 Z Z r; ,-; r r; 1-4' r; r r r r r; 1; . ,4. e4 r; ei .4 ,4 4 r; r; -I -1 l I-1-1 1 a N C _ N (0 0 E Q o V1 r� (0 M a a .1 Cl a N 0 00 M .--1 N N CO m N 0 Cl a N w a m a1 Z W N t0 O V1 O V1 a 01 M 01 M 00 M 00 m 00 M n LD .1 l0 ti 1D ei ID e•-I V1 ei .n M▪I en .-i 0 00 N Uri N a7 01 N l0 a 0 00 N tri a N Cl 00 (0 V1 cr1 N N (0 a (11 `= !n N N N ( .-1 .-I .1 e-. O O O O O 01 01 01 01 01 00 00 00 00 00 00 N. N N. r\ 7 y a a- a s aaa a. a aa a s en en Irl M IIrl (n en en Irl e e m m m m .0 Y m m m en m_ m_ m m m m m m m m m rri rri rri ni m m ni ni ni m m m m Q .n N V1 M 1n VI m V1 V1 U1 111 U1 V1 V1 1/1 V1 V1 U1 V1 V1 UI U1 111 V1 LI1 V1 1n V1 In M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 1. a (0 (0 (0 is (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 1c 10 (0 (0 (0 ui (0 (0 (0 LI (> 1/1 7 00 = 0 . 0 0 m O m O m O N N 0 '0 0 Z .--1 N m a ut l0 n m O1 0 .I N m a 1n 10 N 00 01 0 r-I N M a V1 LO N CO 0000 .--I 0) .--I .--1 .1 .1 N N N r-I N .1 ei N N N N N N N N N 0 U Y W 0 01 a1 °1 0 0000 ___ 0 w Or n 0 o " c o > 0 Lo .O .-. w Ce -O j et a a Ti: a a a a a a N v1 - U m Ol N N N N Al Al N N Al N N 0▪ Z 00 ,d m 'i .i .i 'i .i 'i .-1 '-I 'i .-I 1-1 'i W .0 LA C J n a I 0 00 ID Al .-1 C1 ID a pC • M a ID ID n 00 01 01 .-I N N w w a a a a a a a a Lel ul OLL .-1 .-i .--1 .-i .i N i i' ' '-I N CI C J C 0 ✓ Z- a a LI-1LLA LLA VILLA L L.0 L.0 to 11 00 00 00 00 CO 00 00 CO 00 00 O1 In a fn Zn epi M ID O0 a .-1 In 'i a N .-I a n In 01 N a 01 'i M ID 00 O 0 n 01 .i .i 'i N N N Al Al m M 1 Al NNNNNNNN N 7 V +-. a a a a a a a a a a t O0 tan Yen Lon Yon on V1 N IA e 1 Ln CO C1 C1 01 01 01 01 01 01 O1 01 OO J 'a-1 'i 'i rN ' l .-I 'i 'i 'ai 'i 0 N c9 n N iV CO CO M 00 M co M N 00 0 Nu3 in rn N < ? N tto ID ID LIMA Yi n (t) IO ID n Z d n n n n n n n n n n 13 N N N N N N N N N Al in in in in in in in m m in m m m m m m m m m CO J 0 0 0 0 0 0 0 0 0 0 I,. n n NN Nn n N n N LW a O 0 n N N M 00 m M .-1 a r < Fr, 00 'i m a Ln n 00 LnLn ▪ Z 0 rci ui o Na LO 00 o a n X n co in a MN ' 00 i .-1 al 00 a V a a a a a a M m J - N 0 i '-i '-i '-i '-i '-i .4 M i i Q 'i ' . .1 i' 'i ' i i i ' ' 'i J M oo z in u, ul ul ul Yn in Ln in in ▪ COCe ch Q co CI Q Z in ID Ln N In CO 'i m 0, a N N a C1 01 m 00 M 00 N O IO .ti O _ . .-i 'i 'i 'i .-1 1 0 0 0 0 N Z U /c4 Y ID ID IO ID IO ID LO ID ID ID 4:( Y m m m m M m m M M M L� LA 0 LA LA In u1 In u1 in Ln ra 000000000. 0 J = r Q l0 lt.0 D l0 l0 l0 IO IO IlD t6 — 0 • c CL -cr-,2 IO n N :1.1 IA O1 i n IOO CO N LA n 01 N a Oat 'ii UN N m M M M a a a M M m m Ln Ln m m m cn en Qu ' v a a it it a s a 'Cr ;I- LE 'p0 aA Ln u-) If) Ln it) f, LA Ian M 0- C O1 01 O1 01 01 01 01 01 O1 ro 0 a a a a a a a a a a O0 .-1 'i 'i 'i 'i 'i 'i 'i 'i 'i 0 0 L7 M in O .-I l0 e-1 1.0 l0 LA I-1 Z 0 O1 LD Cr Al .-I 0 CO u1 a Q n ID IO ID YD IO IO 1-^ u1 Ln Z0J 1p IO to IO IO IO IO YD IG ID 'j Al N Al N N N Al N N N • M In rcl M M M in L» in i» M Al M M M Al fn fn L 2 o bb 0 0 0 0 0n M 0 0 n n n n n n n n n n 0 C1 ID NIO N NN N 0 N x - a ID 01 ,) N Al N IO M M h a IO O M Vf n 01 .4 V1 n X l7 O C1 00 N IO Ln 'Cr Cr N -1 ni M x LIl a a a a a a a a a 00 00 - '-I '-1 '-1 'i 'i '-1 'i '-I 'i •-I 0 0 Ln LA LI) LA un LA IA LA LA Ln Q Q ID ID ID ID IO IO ID LD ID ID z Z '-i '-i .-i ,4 'i 'i 'i 'i 'i .-i N N N 0 0 ro E_ Q v z LOA. O o a al a 01 M 'O-I n CO 'i O n in M N o 01 lD Ti in n N ID lb ID ID ID u1 0 IA C co 5- M e rcI "1. m M "1. Ln m M 9 _. rcl m' m m m Mm m Ln Q u1 III 111 In 1,1Yl VI in IA LA IA ro 0 0 0 0 0 0 0 0 0 0 0 Q ID l0 ID IO LO LO YD LO LO IO u v n co o _0 . 0 mj 'im mo O 0 N O "6 O Z 0) O 'i N CO 'Cr D n LA LCOI CO 'i IO 'iy N Al M M e rcl m AIM m O a Y • N V N u N N Y U 0• 0 0 0 I 0 Attachment 8 1/4 Mile Scan Report 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i0 O O O O O N (+l v co V M E o 1 I I I , M I I G w if ! to W _ L 'a I z. 'a° _ to I c, I I i a 0�t " a I L ca I ¢� . to 0- °rCO [b 0 = ho I m °6`' W LU o E Q a t'ae °�� c o ✓ o ( ` II CO a L ��949 �4r co w I I I t10 z t-4 ° i fit° gOy o Nw - o- v ;'8 to to 1 t W lY_ •r; I a N 1 I I Y Y Iz :t. t'. t. co ' oo LV. . :; •*. �t /;44. _ coa cr, M _ co eq °6bs to o cg . _ - - = 0v MV ; - 0 r Q $ - [t¢[ til moo„ � Ipir �-(N�O°o Cilt IIce 0. ci/t00011,:i1 CV O $ p eov a lbs N/ . ' 2' e0,,, ,, a „ s '/ ° clic e T o N g ant ono+ s� °�l�°� Q1! ` oO ``0° I ag NOr °1l a °It ° p ° I :,,,,--: I. 06 I ?� itarIN o / Io t; °� o ° og CO H I % -". T °�l[ I I t� ^ y 4 1 I y • ,, J e z ° ° J: I I C g � a M r �,j I (7. , Wd � � a �1r. Q4': ,P° Aii. i • 0 1 1 v. ,„.,, ..s, t2 k fl I i / . s ' CO Z. z i , w ,' i I m c o f m m a p O o /4 O o o 0 0 0 N . v ACI) coii) z a v Z M In z N.n Oi , Y IOni o A a 'T Z LL �z U 10'Z: 'lei U)SN'C' v M LLcs, _ m O f s • OD ui a I:" C�co Z tL N N V�ZZ CO nujM Nrn co CL LL Z•- v a C°c'.; ,O Z Nto a.. to 0) u_ Z J Z M IL d N (h O tO(n CO ( N? N °� N z Amyu) a s �a tan a to Z m m m� co N d CL CO U) SP04-SE7L1 (P3)Anti-Collision Detailed Report Analysis Method: 30 Least Distance Distance Unit ft Depth Interval: Every 50.00(5)Measured Depth Azimuth Unit deg Step-down Trajectory: Reference Trajectory IC Azimuth Reference: North Analysis Date-24hr Time: March 05,2015-15:03 North Reference: True Analysis Machine: ANA-DEC-9010 Client Eni Petroleum Database 1 Project: locelhoatldrilling-Nikaitchim 2.8 572 Version I Patch: 28572.0 NOTE Measured Depth is referenced to Individual borehole elevation. TVD,NS,EW are referenced to the reference trajectory's wellhead location and borehole elevation. A minimum of 0.300 m is always included for borehole diameters. All local minima Indicated. Results filtered:Depth 7100.00100.MD 0.17377.37 ft,Ct-Ct separation a=1500.00 ft Results highlighted:EOU-EOU separalion 0.1320.0000 Anti-Collision Rules Used Rule Set Name DBM AntiColfsion Standard S002 v5.115.2 Exemption Risk Level: Minor Rule Name Risk Level Jiule Tvee N229Rule SLB Alert Zone Threshold OSF=5.0 S002 05.115.2 Alert Ratio OSF=5.00 SLB Minor Risk Threshold OSF=1.5 5002 05.1(5.2 Minor Ram OSF=1.50 X SLB Major Risk Threshold OSF=1.0 S002 05.1(5.2 Major Ratio OSF=1.00 SLB Surface Rule 5002 v5.115.2 Major CT_CT MAS=32.01(ft) SLB Alert Zone Threshold CtCK=15m 5002 v5.115.2 Alert CT_CT MAS=49.21(ft) Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 1 of 24 Reference Trajectory Summary Field: Nikeifchuq Welt SP04-SE5 Structure: Spy Island 8060801. SP04SE5L1 Slot SPO4 Trajectory: SP04SE7L1(P3) Client: Eni Peholeum Type: Del Plan Coordinate System: NAD27 Alaska State Plane,Zone 04,US Feet North Reference: True Grid Convergence Angle: 0.09060981° Grid Scale Factor: 0.999900156 Magnetic Declination: 18.862° Magnetic Declination Date: April20,2015 Magnetic Model: BGGM 2014 Reference Point EmsbIus Luling aIg0ICat Structure Unc Slot Unc 6053666.440(ftUS) 511715.380(WS) 54.100(ft)MSL 0.000(ft)(1 sigma) 0 000(ft)(1 sigma) Tnlectory Error Model:ISCWSAO 3-0 95.000%Confidence 2.7955 sigma Survevino Proo'While Drilling Description Part MD From(It) MD To(ft) EOU Frog(8) Survey Tool Type Hole Size(n) Casing Diameter(in) Borehole/Survey 1 0.000 41.000 1/100.000 SLB NSG+SSHOT-Depth Only-No GMba 16.000 13.375 SP04-SE5/SPO4-5E5(P3) 1 41.000 900.000 1/100.000 SLB NSG*SSHOT-No Globe 16.000 13.375 SP04-SE5/SPO4SE5(P3) 1 900.000 2400.000 1/100.000 SLB MWD*SAG-No Globe 16.000 13.375 SP04-SE5/SPO4-SE5(P3) 2 900.000 3177.749 1/100.000 SLB MWD+GMAG-No Globe 16.000 13.375 SP04-SE5/SP04SE5(P3) 2 3177.749 5730.000 1/100.000 SLB_MWD*SAG-No Globe 12.250 9.625 SP04-SE5/SP04SE5(P3) 3 3177.749 7100.000 1/100.000 SLB MWD*GMAG-No Globe 12.250 9.625 SP04-SE5/SPO4SE5(P3) 3 7100.000 7425.000 1/100.000 SLB MWD-INC_ONLY_FILLER-No Globe 8.750 5.500 SP04-SE5LI I SPO4-SE7L1(P3) 3 7425.000 8925.000 1/100.000 SLBMWD+SAG-No Globe 8.750 5.500 SP04-SE5L1/SP04-SE7LI(P3) 4 7425.000 17377.367 1/100.000 SLB MWD*GMAG-No Globe 8.750 5.500 SP04-SE5L1/SPO4-SE7LI(P3) • • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 2 of 24 Offset Trajectory Summary Offset Selection Criteria. Offset Selection Criteria:Definitive Surveys-Definitive Plana-DefinNve surveys exclude definitive plans -All Non-Def Surveys when no Def-Survey is set in a borehole-All Non-Def Plans when no Def-Plan is set in a borehole Offset SNecnen Summary Wells Selected./ Boreholes Selacled:9 Definitive Surveys Selected:3 Non-Del Surveys Selected:0 DefinNve Plans Selected:6 Non-Del Plans Selected:0 Total Trejeetories:9 OSF filter in detailed report None •Excluded:The trajectory was analyzed and fully passed all criteria so the detailed results have been excluded from the report for clarity. Trajectory Borehole Well Type Passing Excluded' SP04SE5(P3) SP04SE5 SP04-SE5 Del Plan SP08-N7 SP08-N7 SP0e-N7 Def Survey SP08-N7LI SP08-N7L1 SP08-N7 Del Survey SI07-SE4(P3) SI07SE4 5107-SE4 Def Plan SI02-SE6(P3) SI02SE6 S102SE6 Del Plan SPO9-N9L1(P1) SP09-N9L1 SP09-N9 Del Plan SPO9N9(P1) SP09-N9 SP09N9 Del Plan 5115-N8(P1) 5115-N2 5115-N8 Del Plan S114-N6 SI14-N6 S114-N6 Def Survey • • • • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 3 of 24 Field: Nikedchuq Well: SP04-SE5 Structure: Spy Island Borehole: SP04-SE5 Slot SP04 Trajectory: SP04-SE5(P3) Client: Eni Petroleum Type: Del Plen Coordinate System: NAD27 Alaska State Plane,Zone 04,US Feet North Reference: True Odd Convergence Angle: 0.09060981° Grid Scale Factor: 0.999900156 Magnetic Declination: 18854° Magne5c Declination Date: April 25,2015 Magnetic Model: BGGM 2014 Reference Point Nom E101611 Elevation Saucture Uric. Slot Unc. 60536664401HU5 511715.380((IUS) 54.100(ft)MSL 0GOO 1h(1 sigma) 0000(5)(1 sigma) Tralectory Error Model:ISCWSAO 3-0 95.000.Confidence 2.7966 sigma Surveying Proa'While Drilling Description Part MD From(It) MD To pt)EOU Freq(ft) Survey Tool Type Noe Sloe ion) Gang 04861.0 fin) Borehole I Survey 1 0.000 41.000 1/100.000 SLB NSG+SSHOT-Depen Only-No Global 16.000 13.375 SP04-SE5/SP04-SE5(P3) 1 41.000 900.000 1/100.000 SLB NSG+SSHOT-No Globe 18.000 13.375 SP04SE5/SP04SE5(P3) 1 900.000 2400.000 1/100.000 SLB MWD+SAG-No Globe 16.000 13.375 SP04-SE5/SPO4SE5(P3) 2 9170.000 3177.749 1/100.000 SLB MNA+GMAG-No Globe 16.000 13.375 SP04-SE5/SPOISES(P3) 2 3177.749 5730.000 1/100.000 SLB MWD+SAG-No Globa 12.250 9.825 5PO4-SE5/SP04SE5(P3) 3 3177.749 7409.371 1/100.000 SLB MWD+GMAG-No Globe 12.250 8.625 SP04-SE5/SP04SE5(P3) 3 7408.371 8900.000 1/100.000 SLB MWD+SAG-No Globe 8.750 5.500 SP04-SE5l SP04SE5(P3) 4 7409.371 17397.775 1/100.000 SLB MWD+GMAG-No Globe 8.750 5500 SP04-SE5/SP04SE5(P3) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference ND Reference NS Reference EW Offset MD Offset ND Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (5) (ft) (5) (h) (8) (5) (8) (91 (°) (5) (8) (8) (8) All local minima indicated. Results filtered.Depth 7100.00 ft<=MD<=17377.37 8 Results filtered Ct-Ct separation<-=1500.00ft Results highlighted:Ct-Ct separation co 1320.005 110000 405527 279255 191191 710000 4055.27 2792.55 1911.91 1 0001 121.35 -121.318 -81.3 .002 05F0.50 Fai 711600 4056.14 278492 192595 7116.00 4056.38 2785.05 1926.00 328.95 028 6732 -67.04 -45.01 -0.021 OSF1.50 Fai 7150.00 405755 2768.43 195565 7149.98 4058.75 2769.14 1955.93 331.23 1.42 59.45 58.02 -45.28 0.00 OSF1.50 Far 7200.00 4060.62 2743.75 1999.02 719995 4062.24 2745.73 1999.95 353.68 2.72 92.44 -89.71 -59.31 0.02 OSFI.50 Fai 7250.00 4063.58 271777 204164 7249.88 4065.72 272236 2043.91 9.31 5.55 108.86 -103.3116006 OSF1.50 Far 7300.00 4066.08 2690.38 2083.37 7299.64 4069.19 2699.05 2087.75 16.06 10.22 115.79 -1055 0.12 OSFI.50 Far 7350.00 4068.10 2661.54 2124.18 7349.22 4072.65 2675.83 213142 19.82 1885 12491 -108.26 -67.03 0.18 OSF1.50 Far 7400.00 4050.65 2831.36 2164.01 7398.54 407609 265273 2174.87 22.52 24.82 133.43 54.54 0.27 O5F1.50 Fai 745000 4070.73 259985 2202.82 7447.55 4079.51 262978 2218.03 24.80 3470 143. -6140 0.35 OSF1.50 Fe: 7500.00 4071.33 256705 2240.55 7496.78 4082.86 2606.61 2261.34 26.97 46.15 151.08 54.98 0.45 OSF1.50 Fai 7550.00 4071.46 253300 2277.16 7548.79 4085.49 2582.13 2304.87 29.51 58.13 152.03 -93.90 -43.83 0.57 OSF1.50 Fel 7800.00 4071.11 249774 231260 7597.07 4087.24 2556.43 2348.05 32.31 70.44 153.07 -8263 -32.02 0.68 OSF1.50 Fai 7650.00 407044 246182 2347.48 7647.83 4088.08 2529.40 2390.99 32.42 82.21 164.37 -72.16 -21.11 0.79 OSF1.50 Fai 7700.00 406983 242723 2383.48 7699.51 4087.98 2500.77 243402 31.41 91.08 155.60 -6454 -13.09 0.87 OSF1.50 Fel 7750.00 4050.31 239382 242067 7749.21 40877.37 247267 247500 30.25 97.44 157.13 -59.50 -7.72 0.93 OSF1.50 Fel 780000 4068.88 2361.73 2459.01 7798.97 408677 244453 2518.05 28.85 102.12 15851 -56.39 -3.96 096 OSF1.50 Fai 7850.00 4068.53 233099 2498.44 7848.88 4086.16 2416.31 2557.20 27.29 105.08 180.04 -5496 -2.02 0.98 OSF1.50 Fel ' 7900.00 4068.16 230151 2538.82 7900.62 408564 2386.79 2599.50 28.34 106.23 181.41 -55.19 -179 0.98 OSF1.50 Far 7950.00 4067.68 227225 2579.36 7951.26 408538 2357.18 2640.78 26.22 106.29 18287 -56.58 -2.70 0.97 OSF1.50 Far 8000.00 4067.16 2243.00 2619.91 8001.26 408513 2327.91 268132 26.08 106.32 16039 -58.06 3.88 097 OSF1.50 Fai : 8050.00 406667 2213.75 2660.45 805126 4084.89 2298.65 272186 25.95 106.35 188.18 -59.83 -4.84 0.96 OSF1.50 Far 8100.00 4066.17 2184.49 20100 8101.26 4084.64 2269.38 2762.39 25.81 108.38 187.98 -61.63 -6.01 095 OSF1.50 Fai 8150.00 4060.68 215524 274155 8151.26 4084.40 2240.12 2802.93 25.68 106.41 170.04 -63.63 -738 093 05F7.50 Fel 8200.00 4065.18 2125.98 278209 820126 4084.16 2210.85 284347 25.54 106.44 172.11 -6567 -871 0.92 OSF1.50 Far 8250.00 4064.68 2096.73 2822.64 825126 4083.91 181.59 288401 25.41 80648 17442 57.95 -10.22 0.91 00F1.50 Fal 8300.00 406419 206748 2863.18 8301.26 408367 15232 292455 25.27 106.61 17874 -70.23 -11.73 0.90 OSF1.50 Fa) 8350.00 4063.70 2038.22 2903.73 8351.26 4083.42 123.05 2965.09 25.14 106.54 17923 -7289 -13.35 0.89 OSF1.50 Fel 840.00 4063.72 203897 294428 8401.55 4082.81 2093.62 3005.86 25.47 106.41 18211 -75.0 -15.40 0.87 OSF1.50 Fel 845000 4064.62 1979.72 2984.82 8451.70 4081.37 064.29 3046.52 26.73 108.02 185.77 -79.75 -18.24 085 0SF1.50 Fal 8500.00 4066.29 1950.49 3025.35 8501.59 4078.71 03512 3086.95 28.52 105.54 189.79 -84.25 -21.39 083 OSF1.50 Fai 8550.00 406809 1921.25 3065.87 8551.47 4078.05 005.96 3127.38 30.38 105.16 193.91 -8676 -24.53 0.81 OSF1.50 Fel 8600.00 4069.88 189202 3106.40 8601.35 4076.39 976.79 3187.82 3225 1�044..8�9� 19788 -9299 -2744 0.79 OSF1.50 Fai 50.00 86407167 186279 3148.92 865t.23 407473 947.13 3208.25 34.14 p 10475 201.83 -97.11 30.24 0.77 OSF1.50 Fel 8700.00 4073.46 183355 318745 8701.11 407307 918.48 3248.88 36.0 205.60 -100.92 -3279 0.76 OSF1.50 Fai 8750.00 4075.26 1804.32 3227.97 8750.99 4071.41 889.30 328911 37.91 209.31 -104.55 -35.19 0.75 OSF1.50 Far 8800.00 4077.05 1775.09 3268.50 8600.88 406575 860.12 3329.55 39.79 104.94 212.60 -107.g88g6�� -37.r232rtg44�� 0.74 OSF1.50 Far 8 0 407184 96 330/02 94 4068130 70 14 41.39 10518 OSF1.50 Fai 8873.91 4079.0 1731.88 3328.40 8874.92 406835 8816.82 3.85 389.58 41.98 105.30 217.63 - .% -4U41g OSF1.50 Fai 0. OSF1.50 Far 6900.00 4080.49 1716.62 334955 8901.10 4068.31 801.51 3410.82 42.43 105.39 210.42 000333 35.2299 8950.00 4081.35 168738 3390.10 8951.20 4068.80 77221 3451.45 42.63 105.43 188.18 -8275 -20.43 084 OSF1.50 Far 9000.00 408172 1658.14 3430.65 9001.20 4069.40 74296 3492.00 42.51 105.41 18931 -83.90 -21.20 0.83 OSF1.50 Far 9050.00 408210 1628.89 3471.21 905120 4070.00 713.72 3532.55 42.39 105.38 190.57 -85.19 -2207 0.83 OSF1 50 Fai 9100.00 4082.48 1599.65 351176 9101.20 4070.60 684.48 3573.11 4227 10536 191.83 -86.48 -2294 0.82 OSF1.50 Far I 9150.00 4082.85 1570.41 3552.31 915120 407121 655.23 3613.66 42.14 105.33 193.12 -87.79 -23.83 0.81 OSF1.50 Far 9200.00 4063.23 1541.16 3592.87 9201.20 4071.81 625.99 3654.21 4202 105.31 194.41 59.11 -24.71 0.81 OSF1.50 Fel 9250.00 4083.60 1511.92 3633.42 9251.19 4072.41 598.75 3694.76 41.90 105.28 185.73 -90.45 -2561 0.80 OSF1.50 Fai 9300.00 4083.98 148267 3673.98 9301.19 4073.01 567.51 3735.31 4178 105.26 197.04 -91.78 -25.51 080 09F1.50 Far 9350.00 4084.36 1453.43 3714.53 9351.19 4073.61 538.26 3775.87 41.66 10523 19837 -93.14 -27.42 0.79 OSF1.50 Fai 937398 4084.60 1439.40 3733.98 9375.17 4073.89 524.24 3795.32 41_ 199.00 -93.77 -27.84 0.79 OSF1.50 Far 9400.00 4084.97 142418 375508 9401.26 4074.23 508.98 3816.47 4167 199.62 -94.38 -28.25 0.79 OSF1.50 Far 9450.00 4085.75 139493 3795.82 9451.27 4075.04 479.72 385702 41.65 10523 20085 -95.62 -2907 0.78 OSF1.50 Far 9500.00 4086.53 1365.68 3838.16 9501.27 4075.85 45047 3897.56 4164 105.23 202.10 -96.87 -29.91 0.78 OSF1.50 Far 955000 4087.31 133842 3876.71 9551.27 4076.67 421.22 3938.10 4162 105.23 203.48 -98.26 -3084 0.77 OSF1.50 Fel 9600.00 4088.08 1307.17 3917.25 980127 4077.48 391.96 3978.84 41960 105.22 20487 -99.65 -3177 077 OSF1.50 Far 9650.00 4088.86 1277.92 3957.79 9651.27 407829 36271 4019.19 41.58 105.22 205.28 -101.06 -32.71 0.76 OSF1.50 Far 9700.00 4089.84 124866 5098.33 970127 4079.10 333.46 4059.73 4156 105.22 207.69 -10248 -33.65 0.76 OSF1.50 Far 9750.00 4090.42 1219.41 4038.87 9751.27 4079.91 304.21 4100.27 41.54 105.21 209.13 -103.91 -3461 0.75 OSF1.60 Fai 9800.00 4091.19 1190.16 4079.42 9801.27 408572 274.95 4140.81 41.53 105.21 210.56 -105.35 -35.57 0.75 OSF1.50 Fai 985000 409190 1160.90 4119.96 985131 4081.58 245.68 418139 41.45 105.20 211.97 -106.77 -36.52 0.74 OSF1.50 Far • • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 4 of 24 Trajectory:SP04-SE7L1(P3)Va.SP04SE5(P3) Minimum Allowable Traveling Cylinder Allowable Deviators from EOU-EOU Controlling Reference MD Referanea TVD Reference NS Reference EW CANet MD Offset TVD Offset NS Offset EW North Azlm Ct-Ct Distance Separation Reference Clearance OSF Rule Status (6) (6) (6) (6) (5) (5) (5) (5) l") (6) (6) (ff) (ft) 9900.00 4091.88 1131.65 4160.51 990145 4083.04 216.35 4222.03 10506 213.22 -108.15 073 OSF1.50 Fai 995500 4091.11 1102.40 4201.05 995139 408506 187.16 426250 104.86 214.37 -109.50 0.73 OSF1.50 Fai 0000.00 4090.23 107315 424160 0001.31 4087.10 157.98 4302.95 3752 114.4 21540 -11067 39.25 0.72 OSF1.50 Fai 0050.00 408935 1043.91 4282.14 0051.22 408914 128.80 4343.39 35.9-SII65 218.44 -111.75 -4001 0.72 OSF150 Fai 0100.00 4088.47 1014.88 432268 0101.14 4091.17 099.63 4383.84 34.33 104. 217.33 -112.61 40.57 0.72 OSF1.50 Fai 0150.00 408760 98511 436323 0151.05 4093.21 070.45 4424.29 3274 104.84 218.10 -113.J6266� -40.9o"77 `pA0.7222 OSF150 Fai 0200.00 408672 95117 440377 0200.97 4095.24 041.27 4.16474 31 15 2 -11 1 OSF1/0 Fai 0250.00 4085.84 92692 4444.32 0250.88 409728 01209 4505.18 28.57 105.33 219722' _11 f17 -41.12 072 OOSF1/0 Fai SF1.50 Fai 0300.00 4084.% 897.67 448486 0300.80. 4099.32 98292 4545.63 28.110 10567 218.57 i ill 0350.00 4084.20 868.42 452511 0350.78 4101.34 953.70 458613 26.51 108.08 219.82 -11374 -40.88 0.72 OSF1.50 Fai 0400.00 4094.19 839.17 456596 0401.07 4102.78 92429 4626.90 25.74 10632 220.56 -114.24 -41.13 0.72 OSF1.50 Fai 0450.00 4084.44 809.92 4606.51 0451.40 4103.33 894.85 4667.72 25.58 10638 22191 -11553 -41.97 0.71 OSF1.50 Fai 0500.00 408469 78067 464706 0501.42 410339 865.58 4708.29 25.68 10634 223.52 -117.18 -4308 0.71 OSF1.50 Fai 0550.00 4084.95 75112 468761 0551.42 410314 836.33 4748.84 25.79 106.31 225.15 -11884 -4420 070 OSF1.50 Fai 0600.00 408520 722.17 4728.16 080112 4103.49 807.08 4769.39 25.89 106.27 228.78 -120.51 -45.2 0.70 OSF1.50 Fai 0650.00 408545 69291 476871 0651.42 410354 777.83 4829.94 26.00 108.24 22813 -122.19 -46.45 069 OSF1.50 Fur 0700.00 408570 663.66 4809.26 070112 410360 748.58 4870.49 26.10 106.21 23007 -12387 -47.58 0.69 OSF1.50 Fai 0750.00 408595 634.41 4849.81 0751.42 410365 719.33 4911.04 26.21 108.17 23174 -125.56 -4872 0.68 OSF1.50 Fei 0800.00 408620 60516 489036 080142 4103.70 690.07 4951.59 26.31 106.14 233.40 -12728 -4987 0.68 OSF1.50 Fai 0850.00 408645 575.91 4930.91 065112 4103.76 600.82 499214 26.42 1 235.07 -128.98 -51.01 067 OSF1.50 Fai 0874.31 408650 56169 4950.62 0875.72 4103.78 648.60 5011.85 214 23585 -129.75 -51.54 0.67 0SF1.50 Far 090000 40%44 546.66 4971.46 0901.48 4103.79 631.53 503274 2610 236.63 -130.51 -5205 0.67 OSF1.50 Far 0950.00 4086.10 51741 5012.01 0851.55 4103.46 602.24 5073.35 28.38 106.12 23820 -132.08 -5309 0.66 OSF1.50 Fai 100000 408572 468.16 5052.56 1001.55 4103.11 572.99 5113.90 2637 106.12 23978 -133.88 -5414 0.66 OSF1.50 Fai 105000 4085.35 458.91 5093.11 1051.55 410276 543.74 5154.45 26.38 106.12 24136 -135.24 -55.19 066 OSF1.50 Fai 1100.00 4084.98 429.66 5133.68 1101.55 4102.41 514.50 5195.00 2835 108.13 242.95 -136.83 -56.25 0.65 OSF1.50 Fal 1150.00 408461 400.41 5174.21 1151.55 4102.08 485.25 5235.55 28.34 106.13 24455 -138.42 -57.31 0.65 OSF1.50 Fai 1200.00 4084.24 371.16 521476 1201.55 4101.71 456.00 5278.10 28.2 106.14 246.16 -140.02 -5838 0.64 OSF1.50 Fai 1250.00 408387 341.92 525531 1251.55 4101.37 426.75 5316.65 28.31 108.14 247.77 -14163 -59.45 0.64 OSF150 Fai 1300.00 4083.49 31267 5295.86 1301.55 4101.02 397.50 5357.20 2830 106.14 24938 -143.24 60.52 0.63 OSF1.50 Fai 1350.00 408315 28342 533641 1351.55 4100.67 36825 539775 26.30 106.14 250.99 -144.85 -61.60 0.63 OSF1 50 Fai 1400.00 408316 254.17 5376.96 140184 4099.90 338.83 5438.53 2672 106.02 252.91 -146.90 63.00 0.62 OSF1.50 Fai 1450.00 408360 22492 541751 1451.98 409829 309.51 5479.19 27.82 105.71 255.44 -14972 64.99 062 OSF1.50 Fai 1500.00 408430 195.67 5458.06 1501.93 4096.50 280.31 5519.86 28.16 105.40 258.18 -152.79 67.13 0.61 OSF1.50 Fai 1550.00 4085.00 16642 549861 1551.87 409470 251.12 5560.13 30.52 105.14 280.91 -15577 69.21 0.60 OSF1 50 Fai 1800.00 408570 137.17 5539.15 1601.81 4092.90 221.92 5600.61 3187 104.93 263.52 -158.58 -71.15 0.59 OSF1.50 Fai 1650.00 4086.40 10792 557970 1651.74 4091.10 192.72 5641.08 3323 104.79 26603 -161.24 -72.97 0.59 OSF1.50 Fai 1700.00 4087.10 78.87 562024 1701.68 408930 163.53 588155 34,80 0.71 268.42 -163.71 -74.65 0.58 OSF1.50 Fai 1750.00 4087.80 49.42 5660.79 1751.62 4087.51 13433 5722.03 359 27070 -166.02 -76.19 0.58 OSF1.50 Fai 1800.00 4088.50 20.17 570134 180156 4085.71 105.13 5762.50 3733 1047 272.86 -168.13 -77.59 0.57 OSF1.50 Fai 1850.00 4089,18 -908 574188 1851.52 408393 75.92 5802.99 38.67 104.82 274.86 -170.04 -78.63 0.57 OSF150 Fai 1900.00 4089.52 -38.33 5782.43 1901.60 4082.77 46.83 584360 3850 104.90 276.54 -171.64 -78.86 0.56 OSF1.50 Fai 1950.00 4068.58 6758 582298 1951.68 4062.38 1735 5184.20 39.73 101.93 278.09 -173.16 -80.87 0.56 OSF150 Fai 2000.00 4089.59 -9683 586353 200166 4062.12 -11.90 592475 89.89 10195 279.71 -174.76 -81.93 0.58 OSF150 Fai 2050.00 4089.82 -12608 5904.09 2051.66 408185 -41.16 596530 40.05 101.97 281.46 -178.49 -83.07 0.56 OSF150 Fai 2100.00 4089.65 -155.33 5944.64 2101.66 408159 -70.41 600585 40.21 10500 283.21 -176.21 54.22 0.55 OSF1.50 Fai 2150.00 4089.68 -18458 598519 2151.66 4081.33 59.66 604640 40.37 105.02 284.96 -17994 65.36 0.55 OSF1.50 Fai 220500 4089.71 -213.84 602574 2201.66 408107 -128.91 608694 40.52 10504 286.71 -18167 68.51 0.55 OSF1 50 Fai 2250.00 4089.74 -243.09 606829 2251.68 4080.80 -15816 612749 4088 10507 288.47 -183.41 .87.66 0.54 OSF150 Fai 2300.00 4089.77 -27234 610684 2301.65 4080.54 -18711 616804 40.84 105.09 29023 -185.14 -88.80 0.54 OSF150 Fai 2350.00 4089.84 -301.59 614739 2351.65 408028 -216.68 620859 41.02 105.12 29196 -188.84 59.92 0.54 OSF1.50 Fai ' 240000 409027 -330.84 6187.93 2401.75 0080.11 -245.97 624922 41.38 105.18 29353 -188.35 -90.91 0.53 OSF1.50 Fai 2450.00 4090.87 -300.10 6228.48 2451.75 4080.27 -275.22 6289.76 41.59 105.22 295.16 -189.94 -91.96 0.53 OSF1.50 Fai 2500.00 4091.46 -389.35 6269.02 260174 4080.43 -304.48 6330.31 41.83 105.27 29679 -191.52 -93.00 0.53 OSF1.50 Fai 2550.00 4092.05 -41861 6309.57 2551.74 4080.58 -333.74 6370.85 4207 105.31 298.55 -193.24 -9413 0.53 OSF1.50 Fai 280.00 4092.65 -447.88 6350.11 2801.74 408074 -362.99 641140 42.30 10536 300.30 -194.94 -%.25 0.52 OSF1.50 Fai 2660.00 4093.24 -477.12 6390.85 2651.74 4080.90 -392.25 645194 42.54 105.41 30206 -196.85 -9637 0.52 OSF1.50 Fai 270100 4093.83 -50637 643120 2701.74 408105 -421.50 649249 42.77 105.46 30381 -198.35 -97.48 0.52 OSF1.50 Fai 2750.00 409442 -535.63 6471.74 2751.74 4081.21 -450.76 6533.03 43.01 105.51 30556 -200.04 -98.60 0.51 OSF1.50 Far 280100 4095.02 364.88 651229 2801.73 408137 -480.02 657358 43.24 105.57 307.30 -201.73 -99.71 0.51 OSF1.50 Fa 2850.00 4095.59 -594.14 6652.83 2651.98 408195 -509.40 6814.30 43.23 105.57 30695 -203.38 -100.80 0.51 OSF1.50 Fai 290000 409559 -62339 6593.38 2902.15 4083.42 -538.75 6654.99 4242 105.39 31070 -205.31 -10215 0.50 OSF1.50 Fai 2950.00 409485 -652.63 863393 2952.18 4085.70 -587.98 6695.53 40.79 105.08 31238 -207.30 -103.58 0.50 OSF1.50 Fai 3000.00 409402 681.87 6674.48 3002.07 4088.14 387.13 6735.95 39.01 10185 31394 -209.09 -10185 0.50 OSF1.50 Fai 305000 4093.20 -711.11 6715.03 3051.96 4090.58 526.27 6776.37 37.23 104.72 315.36 -210.64 -105.93 0.49 OSF1.50 Far 310000 409237 -740.35 6755.58 3101.85 4093.02 -655.42 8816.79 35.1 31316.42 -2112 164 -106 74 107.74 0.49 OSF1/0 Fai OSF1.50 Fai 315000 4091.55 -76959 679613 3151.75 4095.47 684.57 6857.21 3366 7 326500 4090 73 33 320114 91 -71172 63 7 04.93 31806 a OSF1.50 Fai 3250.00 408990 -88.07 687723 3251.53 4100735 -74286 6938705 30.70 05.21 318.44 -15�5i -10/.4 0OSF1.50 Fai 3300.00 4089.08 -857.31 891778 3301.43 410279 -772.01 697847 28.34 05.58 31855 -21217 -107.19 0.49 06F1.50 Fai 335000 4088.25 -88656 6958.33 3351.80 4104.85 -801.33 7019.13 2679 05.99 31864 -212.65 -106.84 0.50 OSF1.50 Fai 3400.00 408764 -915.80 6998.88 3401.89 4106.03 -83074 7059.90 25.85 06.29 319.18 -212.87 -106.89 0.50 OSF1.50 Fal 3450.00 4087.15 -94506 703942 3452.12 410637 -860.13 7100.64 2511 08.44 32038 -21394 -10755 0.49 OSF1.50 Fai • 3500.00 4086.67 -974.31 7079.97 3502.12 410651 -88/38 7141.18 25.08 06.56 2173 -215.18 -10834 0.49 OSF1.50 Fai 3550.00 408618 -1003.57 7120.51 3552.11 4106.64 -91864 7181.73 24.75 06.67 32308 -21641 -108.13 0.49 OSF1.50 Fai 3800.00 4085.70 -10282 716106 3602.11 4106.78 -947.89 7222.27 24.43 08.79 2112 -217.83 -10990 049 OSF1.50 Far 3850.00 4085.21 -1062.08 7201.60 3852.11 4106.91 -977.15 7262.81 24.10 06.92 32575 -21884 -11066 0.49 OSF1.50 Fai 3700.00 4081.73 -109134 724215 3702.10 4107.05 -1006.40 7303.36 23.77 07.04 32707 -720.03 -111.41 049 OSF1.50 Fai 3750.00 4084.24 -112059 7282.69 375210 410719 -1035.68 7343.90 23.45 0718 28.38 -221.21 -112.15 0.49 OSF1.50 Fai 380000 4083.75 -1149.85 732324 3892.10 410732 -1064.91 7384.44 23.13 0731 32968 -222.37 -112.89 0.48 OSF1.50 Fai 3850.00 4083.35 -117910 7363.78 3852.09 4107.46 -1094.17 7424.99 22.84 07.43 33099 -223.56 -113.64 0.48 OSF1.50 Fai 3900.00 408336 -1208.36 7404.33 3901.91 410767 -1123.32 746539 22.73 07.47 32.44 -224.97 -114.56 0.48 OSF1.50 Fai 1 3950.00 4083.76 -1237.61 7444.88 3951.91 4108.14 -1152.57 7505.94 22.89 0719 333.93 -226.44 -115.53 0.48 OSF1.50 Fai 4000.00 4084.23 -1266.86 7485.43 400191 410861 -1181.82 7548.49 22.69 07.49 335.52 -228.03 -116.60 0.48 OSF1.50 Fai , 4050.00 4081.70 -1298.11 7525.98 4051.81 410909 -1211.07 7587.04 22.89 07.49 33732 -229.83 -117.80 017 OSF1.50 Fai • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 5 of 24 Trajectory:SP04-SE711(P3)Va.SP04SE5(P3) Minimum Allowable Traveling Cylinder Nlowable Deviation from 000-609 Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Ann Ct-Ct Distance Separation Reference Clearance OSF Rule Stabs )(1) (5) (5) (8) (8) (8) (8) (8) (*) (8) (6) (8) (8) 4100.00 4085.17 -132536 7566.53 410191 410958 1240.32 7627.59 2269 10749 339.12 -231.63 -119.00 0.47 OSF1 50 Fai 4150.00 4085.65 -1354.61 7607.08 415191 4110.03 -128957 766813 22.69 10749 34092 -233.43 i-12020 0.47 OSF1.50 Fai 4200.00 4086.12 -1383.66 764762 420191 4110.51 -1298.82 7708.68 2269 107.49 34272 -235.23 -121.40 0.47 OSF1.50 Fai 4250.00 4086.59 -1113.11 7688.17 4251.91 4110.98 -1326.07 774923 22.69 10749 344.53 -237.03 -122.60 0.46 OSF1.50 Fai 430000 4087.07 -1442.36 7728.72 430191 4111.48 -1357.32 778978 2269 107.49 34833 -238.84 -123.80 0.46 OSF1.50 Fai 4350.00 4087.94 -147161 7769.27 4351.91 4111.93 -1386.57 7830.33 22.90 107.40 34841 -24100 -125.28 0.46 OSF1.50 Fai 440000 4099.69 -1500.84 7809.79 4402.18 4112.19 -1415.98 787109 23.60 107.08 351.32 -244.24 -127.54 0.45 OSF1.50 Fai 4450.00 409231 -1530.05 7850.29 445244 4111.60 -1445.38 791185 25.39 106.45 35547 -249.02 -130.94 0.45 OSF1.50 Fai 4500.00 4095.69 -1559.24 7890.74 450250 411015 -147486 795243 27.98 1Q0g166888 360.54 -254.86 -135.09 044 OSF150 Fai 4550.00 409917 -158842 7931 19 4552.36 4107.83 -1503.79 7992/2 31.10 10/2t 15 0.43 OSF1.50 Fai 4600.00 7971.65 4601 7 4105.11 77 41 042 OSF110 Fai 4650.00 4108,12 -16646.7788 801210 4651.59 4102.40 -1581.76 8073118 37.83 104.75 373.40 -26864 -1.07 -26136 44.59 042 OSF1.50 Fai 4700.00 i 4109.60 -167596 8052.55 4701.20 4099.89 -1590.74 8113.36 41.18 105.16 375.0 _97p.4� -145.60 041 OSF1.50 Fai 4750.00 4113.08 -1705.14 809300 475089 4097.00 -1619.77 8153.59 44.49 10592 378 2707 -145.61 04 OSF1.50 Fai 4800.00 4118.55 -173432 8133.46 4800.91 409493 -1649.01 8194.13 47.42 10690 376.82 -269.92 -144.72 0.42 OSF1.50 Fai 4850.00 4119.44 -176352 8173.94 4851.16 4093.73 -1678.39 8234.87 49.58 10780 37672 -268.92 -143.76 0.43 OSF1.50 Fai 4900.00 412146 -1792.75 8214.45 4901.53 4033.40 -1707.86 8275.71 50.80 10838 377.15 -268.77 -143.46 0.43 OSF1.50 Fai 4950.00 412282 -1821.99 8254.99 4951.51 409343 -1737.10 8316.25 51.38 10888 378.40 -269.72 -144.00 0.43 OSF1.50 Fai 5000.00 412293 -1851.24 8295.54 5001.51 4093.46 -1786.35 8356.80 51.53 108.76 380.09 -271.33 -145.04 0.43 OSF1.50 Fai 5050.00 412304 -188049 8336.10 505151 4093.49 -1795.60 8397.35 51.57 10878 381.89 -273.12 -146.23 0.42 OSF1.50 Fai 5100.00 4123.15 -1909.74 837665 5101.51 4093.52 -1824.85 843790 51.60 108.80 383.70 -271.90 -147.41 042 OSF1.50 Fai 5150.00 4123.25 -193900 841720 5151.51 4093.55 -1854.11 8478.45 51.84 10882 385.51 -276.69 -148.60 0.42 OSF1.50 Fai 5200.00 4123.36 -1968.25 8457.75 5201.51 4093.58 -1883.36 8519.01 51.88 108.84 38731 -278.48 -149.78 0.42 OSF1.50 Fai 5250.00 4123.47 -199750 6498.30 5251.51 4093.61 -1912.61 8559.56 5172 108.88 389.12 -28027 -150.97 042 OSF1.50 Fai 530000 4123.58 -2026.75 8538.85 5301.51 4093.64 -1941.86 8600.11 51.78 10888 39093 -28206 -15215 0.41 OSF1.50 Fai 5350.00 4123.68 -2056.00 857940 535151 4093.67 -1971.11 8840.88 51.80 108.90 392.75 -283.85 -153.34 0.41 OSF1.50 Fai 5400.00 4123.79 -2085.25 8619.95 5401.42 409369 -2000.31 8681.14 51.84 108.92 394.56 -285.63 -15452 0.41 OSF1.50 FM 5450.00 4123.80 -211450 866050 5450.92 4093.15 -2029.26 872128 5217 109.10 39605 -28694 -15533 0.41 OSF1.50 Fai 550000 4124.00 -2143.75 8701.05 5500.91 409221 -2058.51 8761.81 52.70 109.40 39724 -28783 -155; OSF1.50 Fai 555000 4124.11 -217300 874161 5550.90 4091.27 -2067.75 8802.34 53.22 109.71 398.40 -28869 -156 OSF1.50 Fai 560000 4124.22 -2202.25 8782.16 560.89 4090.32 -2116.99 8842.88 53.74 110.03 399.53 -26950 -15673 OSF1.50 Fai ' 5650.0 4124.32 -2231.50 882271 5650.87 408938 -2146.23 8883.41 51.26 110.35 10.63 -29028 -157.14 0.41 OSF1.50 Fai 570.0 4124.43 -2260.75 8863.26 570.86 4088.44 -217547 8923.95 54.78 110.69 401.70 -29101 -157.52 0.41 OSF1.50 Fai 575000 4124.54 -2290.0 8903.81 5750.85 408750 -2204.71 6964.18 55.29 111.03 402.74 -29171 -15767 041 OSF1.50 Fai 580.0 412464 -231925 894436 580.84 4086.56 -2233.95 80502 55.60 111.39 403.76 -292.37 -158.19 041 OSF1.50 Fai 5850.0 4124.75 -2348.51 8984.91 5850.83 408562 -2283.19 9045.55 56.30 11175 401.74 -29299 -158.49 041 OSF1.50 Fai 59000 4124.70 -2377.76 9025.46 5901.69 4085.21 -229294 908679 56.47 11167 406.09 -29422 -15926 0.41 OSF1.50 Fai 5950.0 4123.84 -2407.0 9066.01 595252 408593 -232267 9128.02 5570 111.33 408.90 -297.57 -16188 0.41 OSF1.50 Fai 60000 4122.12 -2438.24 9106.53 800.20 408777 -235230 9169.08 53.92 110.17 413.18 -303.01 -16.5.69 0.40 OSF1.50 Fai 605000 4119.52 -2465.45 9147.03 6053.59 400.70 -2381.73 920988 51.11 108.58 418.50 -309.92 -170.83 0.39 OSF1.50 Fai 810.0 4116.10 -2494.63 9187.48 610.58 4094.71 -2410.88 9250.30 47.25 106.85 423.98 -317.13 -17621 037 OSF1.50 Fai 6150.0 4112.49 -2523.0 9227.93 6153.20 4099.76 -2439.75 920.33 4287 10545 428.18 -322.2`y7}333 -1848800.41 0.37 OSF1.50 Fai .00 410189 .37 820239 74 -2489 32 932193 -1 .33 036 OSF1.50 Fai ' 62.30 410.07 -255957 9277 X751 8213.46 410713 -247474 9338.84 36.31 4429.981 29. -' 5397 -161.3. 0.34 OOSF110 Fai SF1.50 Fai 625000 4105.60 -2562.17 9308.84 6251 47 4111.91 -2498.0 936942 32 39�ST 630.0 410.39 -261139 9349.35 630075 4118.10 -2525.40 940.07 27.85 05.73 42551 -319.78 -178.35 0.37 OSF1.50 Fai 6350.0 4102.28 -264064 9389.88 6350.21 412431 -2554.11 9448.87 2393 0702 420.96 -313.94 -17403 0.38 OSF1.50 Fai 64000 4102.22 -2669.89 9430.43 6400.45 4130.04 -2583.30 9489.35 20.91 0836 418.74 -308.38 -16087 0.39 OSF1.0 Fai 640.0 4103.27 -2699.14 9470.97 6450.98 413469 -261274 953015 19.07 09.33 414.33 -305.0 -16729 0.39 OSF1.0 Fai 6500.00 4105.26 -272837 9511.48 6001.67 413825 -2642.33 9571.16 18.30 09.78 414.18 -30439 -166.74 0.39 OSF1.0 Fai 6550.0 4107.36 -275760 9551.99 655241 4140.69 -2871.98 9812.25 18.15 09.87 415.60 30.72 -16760 0.39 OSF1.50 Fai 660.0 4109.47 -2786.83 959250 803.13 41420 -2701.65 9653.37 1858 0.83 418.37 -30873 -16969 0.39 OSF1.50 Fai 660.0 4111.58 -281607 9633.02 6653.54 4142.27 -2731.15 8694.25 19.49 09.10 422.38 -313.28 -172.89 0.38 OSF1.50 Fai 670.0 4113.69 -2845.30 9673.53 6703.50 414232 -2780.38 9734.76 20.53 08.54 426.81 -318.07 -176.28 0.38 OSF1.50 Fai 870.0 4115.79 -2674.53 9714.04 6753.46 414237 -2789.62 9775.27 21.58 08.01 430.77 322.78 -17958 037 05F1.50 Fai 6800.0 4117.90 -2903.76 9754.55 6803.42 414242 -2818.85 9815.79 2284 07.53 434.85 327.33 -18278 0.37 OSF1.50 Fai 680.0 4118.99 -293299 979506 6853.37 414247 -2848.08 985630 23.70 07.08 438.82 331.75 -185.88 0.38 OSF1.50 Fai 690.0 4121.75 -2962.22 983559 6903.12 414285 -2877.18 9896.64 24.51 06.75 44220 335.45 -188.48 038 OSF1.50 Fai 690.0 4123.12 -2991.16 9876.12 695290 414354 -2906.30 9937.01 24.76 06.86 444.38 337.72 -190.0 036 OSF1.50 Fai 700.0 4124.41 3020.69 9916.67 7002.0 414457 -2935.54 9977.56 24.90 0.81 446.42 -339.81 -191.41 036 OSF1.50 Fai 7050.0 4125.70 -304993 995721 7052.90 414580 -2964.78 1018.11 25.03 06.56 448.56 3420 -192.89 0.35 OSF1.0 Fai 710.0 4127.0 307916 9997.75 7102.0 4146.63 -2994.01 10058.65 25.17 06.51 45071 -34420 -194.37 0.35 OSF1.50 Fai 710.0 412829 3108.40 1003829 715290 4147.66 3023.25 10099.20 25.31 08.46 45285 346.0 -195.85 0.35 OSF1.50 Fai 7200.0 4129.58 3137.63 107883 7202.0 414869 3052.49 1013974 25.45 0.11 45500 -348.59 -197.33 0.35 OSF1.50 Fai •• 7250.0 413088 -316687 10119.38 7252.90 4149.72 -308173 10180.29 25.59 06.37 457.15 -35078 -198.81 0.35 OSF1.0 Fai 7300.0 413217 -3196.10 1015992 7302.90 410.75 3110.97 1022084 25.73 0.32 459.30 -352.98 -20.29 0.34 OSF1.0 Fai 73500 4133.48 3225.34 1020.46 735290 4151.78 3140.21 10281.38 25.87 48145 -355.17 -20176 Q OSF1.50 Fai 7377.37 4134.17 -324134 10222.65 738026 4152.34 3156.21 10283.57 25.95 46264 358.371 -202.571 0.94 OSF1.50 Fai End of results • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 6 of 24 Field: Nikeddtuq Well: SPOB-N7 Structure: Spy Wend Borehole: SP08-N7 Slot SP08 Trajectory: SP08-N7 Client: Eni Petroleum Type: Del Survey Coordinate System: NAD27 Alaska Stele Plans,Zone 04,US Feel North Reterente: True Grid Convergence Angle: 009030636° Grid Scale Factor: 0.999900155 Magnetic Declination: 19.68r Magneto Declination Date: October 03.2013 Magnetic Model: BGGM 2013 Reference Point oN rthina failing Qualm Structure Uric. Slot Unc. 6053658 800 MUS) 511676.160 MUS) 53.930(ft)MSL 0000(ft)(1 sigma) 0.0001ft)(1 sigma) Traleotory Error Model.ISCWSAO 1-D 95.000%ConOdenoe 1.7955 sigma SurveNna Pro%As Drilled Description MD From(R) MD To(N) EOU Freq Survey Tool Type Hole Size(In) Casing Diameter(In) Borehole/Survey 0.000 40.830 1/98.425 SLB NSG+SSHOT-Depth Only-No Global 16000 13.375 SP08-N7/SP08-N7 40830 40.830 Act-Stns SLB NSG+SSHOT-Depth Only-No Global 16.005 13375 SP08-N7/SP08N7 40.830 579.980 ActSths SLB_NSG•SSHOT-No Gleba 16.000 13375 SPO8-N7/SP08N7 579.980 20"09.640 ActStns SLB_MWD0GMAG-No Globe 16.000 13.375 SP08-N7/SP08-N7 2609.640 2703.480 Act-Sins SLB_MWD-INC ONLY FILLER-No Globe 12.250 9.625 SP08-N7/SP08-N7 2703480 8000.950 AtSlns SLB MWD0GMAG-No Globe 12.250 9.625 SPO8N7/SPO8-N7 8000.950 15804.570 Ac5St1 SLB_MWD•GMAG-No Globe 8750 5.500 SP08N7/SPO8N7 15804.570 15870.000 ActSms SLB BLIND+TREND-No Globe 8.750 5.500 SPO8N7/SPOBN7 Minimum Allowable Trawling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (ft) (5) On (ft) (ft) (ft) (ft) (°) (ft) Ift) (ft) (ft) All local minima indicted. Results filtered:Depth 7100.00604 MD<_17377.37 ft Results thered:Ct-Ct separation<_1500.00 ft Resuhs highlighted:Ct-Ct separation<-1320.009 7100.00 405527 2792.55 191191 7410.18 3979.44 2854.81 198056 69.75 11975 9470 2505 5626 190 0561.50 Warning 7150.00 4057.55 2768.43 1955.65 7361.38 3973.81 2818.01 200724 80.24 110.15 89, 211 50.41 1. OSF1.50 Naming 7179.00 4059.24 275422 198087 733815 3970.51 279672 202219 86.95 106.71 84.64 220 49. 1.90 OSF1.50 blaming 7200.00 4060.62 271375 199902 7319.33 3968.11 2781.35 203279 92. 8109 24.32 5099 1.96 OSF1.50 Warning 725000 4063.58 2717.77 2041.64 7275.40 3962.11 274506 2056.79 105.22 106.16 7281 33.35 5726 220 OSF150 Naming 7300.00 4066.08 269036 2083.37 7232.14 395555 270873 2079.36 11755 11212 6591 4621 87.82 2.57 OSF1.50 Warning 735000 4068.10 266154 2124.18 7187.73 3948.42 2671.04 2101.73 128.89 12214 61.93 80.21 80.50 2.98 OSF1.50 Naming 7400.00 406965 2631.36 216401 7142.91 3941.16 2632.77 2123.90 13862 134.61 6147 7314 93.27 332 OSF1.50 Warning 7450.00 4070.73 2599.85 2202.82 7098.88 3933.88 2594.93 2145.19 14674 148.57 64.48 84.09 10523 3.49 OSF1.50 yearning 7500.00 4071.33 2567.05 224055 7055.08 392628 2558.98 216571 153.65 16353 69.02 94.50 117.16 3.59 OSF1.50 Warning 7550.00 407146 2533.00 2277.16 7011.50 3918.38 251894 2185.43 159.59 17901 72.05 106.96 13062 3.76 OSF1.50 Waming 7600.00 4071.11 2497.74 231260 8968.09 3910.15 248074 2204.33 164.77 194.73 74.54 12019 144.88 3.95 OSF1.50 Warning 7660.60 4070.44 2461.92 2347.48 6924.34 3901.60 2441.89 222257 166.02 21097 76.81 134.16 15941 4.16 OSF1.50 Warning 7700.00 4069.83 2427.23 2383.48 6881.42 3893.47 2403.25 2239.36 16606 22902 79.45 14957 17570 4.36 OSF1.50 Warning 775060 4069.31 2393.82 2420.87 6839.20 388578 2364.73 2254.84 166.23 249.07 8239 166.68 193.78 4.57 OSF1.50 Warning 7800.00 4088.88 2361.73 245801 6796.87 387830 232585 2269.84 166.40 27091 85.40 185.51 21362 4.80 OSF1.50 Wanting 7850.00 4068.53 233099 2498.14 675589 387128 2288.04 2283.98 166.42 29452 88.38 206.14 235.24 5.04 OSF1.50 Pass 7900.00 4068.16 2301.51 2538.82 6716.39 386455 2251.49 2297.36 16735 31978 9123 228.55 258.60 5.30 0571.50 Pass 7950.00 4067.66 227225 2579.36 6677.33 3857.86 221527 231039 169.70 345.85 93.80 252.05 282.98 558 OSF1.50 Pass 8000.00 4067.16 2243.00 2819.91 6636.87 3850.93 217771 2323.71 171.84 372.50 9626 27624 307.97 5.85 OSF1.50 Pass 805000 4066.67 2213.75 286045 659609 3844.05 2139.81 2337.11 173.75 399.48 98.61 30087 333.38 6.13 OSFI.50 Pass 810000 4066.17 2184.49 2701.00 6558.11 383766 2104.49 2349.51 175.33 42680 100.45 326.35 35948 6.43 OSFt.50 Pass 815000 4065.68 2155.24 274155 652289 3831.25 2071.77 236087 176.60 454.79 101.89 352.89 386.50 6.75 OSF1.50 Pass 820000 4065.18 212598 2782.09 6468.06 3824.39 203947 2371.95 17767 483.41 103.13 380.28 414.30 7.09 OSF1.50 Pass 8250.00 406468 2096.73 2822.64 6454.42 381741 2008.26 2382.39 178.58 512.63 10422 408.42 442.80 744 OSFI.50 Pass 8300.00 4064.19 2067.48 2863.18 6421.54 381048 977.65 239219 179.40 542.47 105.18 437.29 47199 7.80 OSF1.50 Pass 835000 406370 2038.22 2903.73 6389.40 3803.62 947.62 2401.39 180.22 57288 106.11 466.77 501.79 8.17 OSF1.50 Pass 8400.00 4063.72 2008.97 2944.28 6360.15 3797.26 92021 2409.36 181.47 604.16 106.77 497.39 53262 8.56 OSF1.50 Pass 8450.00 406462 1979.72 2984.82 633181 3790.95 883.57 241668 182.67 638.47 107.33 529.14 564.56 897 OSF1.50 Pass 8500.00 4066.29 1950.49 302535 6304.35 378470 867.70 2423.39 183.45 869.70 10780 561.90 597.48 9.40 OSF1.50 Pass 8550.00 406809 1921.25 3065.87 6279.30 377892 844.01 2429.13 183.79 70358 10821 59537 631.08 9.84 OSF1.50 Pass 860000 4069.88 189202 3106.40 6255.68 377355 821.54 2434.07 180.12 738.10 106.54 629.56 665.38 10.29 OSF1.50 Pass 8650.00 4071.67 1862.79 3146.92 6232.89 3768.45 799.75 243840 184.45 773.25 106.91 664.34 700.29 10.74 OSFt.50 Pass 87130.00 4073.46 1833.55 318715 6210.90 3763.59 778.64 2442.17 184.77 809.00 109.24 699.76 735.81 11.20 OSF1.50 Pass 8750.00 4075.26 1804.32 3227.97 6191.36 375933 75981 244516 185.08 845.33 109.48 735.87 772.00 11.68 O9F1.50 Pass 8800.00 4077.05 177509 3288.50 6173.39 3755.43 742.43 2447.55 18533 88231 109.59 772.71 808.89 12.18 OSF1.50 Pass 8850.00 4078.84 1745.66 3309.02 6156.16 3751.71 725.72 2449.51 18559 919.88 10973 810.14 846.37 12.68 OSFI.50 Pass 8900.00 4080.49 171662 334955 8139.61 374816 70964 2451.10 18525 95797 10886 848.11 884.38 13.19 OSF1.50 Pass 8950.00 4081.35 1687.38 3390.10 6123.65 3744.74 89409 2452.34 181.49 998.36 94.10 902.28 933.27 16.05 OSFI.50 Pass 9000.00 4081.72 1658.14 3430.65 6108.28 3741.48 679.10 245328 184.73 1035.11 93.71 941.40 972.28 18.74 OSF1.50 Pass 9050.09 408210 1628.89 3471.21 6093.51 3738.34 664.60 2453.95 184.99 1074.36 9335 981.01 1011.77 17.45 OSF1.50 Pass 9100.00 4082.48 1599.65 351176 0079.32 3735.31 650.84 2454.38 18525 1114.09 92.99 1021.10 1051.74 1816 OSF1.50 Pass 9150.00 4082.85 157041 3552.31 6065.68 373238 637.52 2454.60 185.49 1154.26 92.64 1061.62 1092.14 18.89 OSFI.50 Pass 9200.00 4083.23 1541.16 359287 6052.57 3729.57 824.71 2454.63 185.72 1194.84 92.30 110255 1132.96 1983 OSF1.50 Pass 9250.00 4083.00 151192 3833.42 603995 3726.85 61239 2454.48 185.93 1235.83 91.97 1143.86 1174.16 2037 OSFt.50 Pass 930000 4083.98 148267 367398 602781 3724.23 600.53 2454.19 188.14 1277.18 91.85 118554 1215.73 21.13 OSF1.50 Pass 9350.00 4084.36 145343 3714.53 6015.79 372162 588.81 2453.75 188.38 131889 9135 1227.55 1257.64 21.90 OSF1.50 Pass 9400.00 4084.97 1424.18 3755.08 6001.46 3718.56 574.83 2453.06 187.23 1380.96 91.10 1269.85 1288.87 22.66 OSF1.50 Pass 945000 4085.75 1394.93 3795.62 5987.59 3715.64 561,30 245225 187.44 1403.32 90.89 131243 134237 23.42 OSF1.50 Pass 9500.00 4088.53 1365.68 3838.16 597415 3712.86 548.18 2451.33 187.66 1445.92 90.68 1355.24 1385.11 24.19 OSF1.50 Pass 9550.00 4087.31 133612 387671 5961.12 371022 535.46 245031 187.68 1488.78 90.48 1398.28 1428.08 24.96 OSF1.50 Pass 9600.00 4088.08 1307.17 3917.25 5948.49 3707.71 523.13 2449.20 18806 1531.82 9028 1441.54 1471.28 25.74 OSF1.50 Pass 9850.00 408886 1277.92 3957.79 5936.23 3705.31 511.17 244802 18825 1575.10 9009 1485.01 151488 26.52 OSF7.00 Pass 9700.00 4089.84 124866 3998.33 592434 3703.03 499.56 2446.76 188.44 1618.58 89.90 1528.68 1558.29 27.31 OSF1.50 Pass 975000 409042 1219.41 403887 5912.38 3700.75 487.90 2445.39 168.63 1882.26 8970 1572.56 160210 28.11 OSF1.50 Pass 9800.00 4091.19 1190.16 4079.42 5900.74 3898.55 476.56 2443.98 188.81 1706.12 8950 1616.62 1646.10 28.92 OSF1.50 Pass 985000 4091.90 118090 411996 5889.41 3006.40 485.53 2442.52 188.30 1750.15 8931 1660.83 1690.25 29.73 OSF1.50 Pass 9900.00 4091.88 1131.65 4160.51 5878.30 3694.31 454.73 2441.01 168.84 1794.18 89.14 1705.05 1734.40 30.54 OSF1.50 Pass 9950.00 4091.11 110240 4201.05 5867.43 3892.26 444.16 2439.47 166.24 1838.22 88.97 1749.25 1778.55 31.35 OSF1.50 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 7 of 24 Trajectory:SP04-SE7L7(P3)Vs.SP08-N7 Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Referenoe MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Acim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (0) (ft) (ft) (ft) (ft) (ft) (ft) (ft) 1°) (ft) (8) (ft) (ft) 000000 409023 1073.15 4241.60 5856.83 3680.27 433.87 2437.88 188.43 1882.41 88.81 1793.60 1822.85 32.16 OSF1.50 Pass 0050.00 4089.35 1043.91 4282.14 5846.50 3688.33 423.85 2436.28 186.61 1926.76 88.66 1838.10 1867.30 32.98 OSF1.50 Pass 0100.00 408847 1014.66 4322.88 5836.43 388645 414.10 2434.65 186.79 1971.26 88.50 1882.76 1911.90 33.80 OSF1.50 Pass 0150.00 4087.60 985.41 4363.23 5827.16 3684.72 405.13 2433.09 186.95 2015.91 88.35 1927.56 195866 34.63 OSF1.50 Pass 0200.00 4086.72 956.17 4403.77 581883 3883.16 397.07 2431.63 187.09 2060.73 89.20 1972.53 2001.57 35.46 OSF1.50 Pass 0250.00 4085.84 926.92 4444.32 5810.72 3681.63 389.25 2430.17 187.23 2105.69 88.05 2017.63 2046.63 36.29 OSF1.50 Pass 0300.00 4084.96 897.67 448486 580283 3680.13 381.63 2428.70 18736 2150.79 87.91 2062.89 2091.83 37.13 OSF1.50 Pass 0350.00 408420 868.42 4525.41 5795.14 3678.67 37423 2427.22 188.47 2196.06 87.76 2108.30 213720 37.98 OSF1.50 Pass 040000 4084.19 839.17 4565.96 5787.70 3677.24 367.09 2425.75 190.10 224180 87.59 215401 2182.85 38.84 OSF1.50 Pass 0450.00 408444 809.92 4606.51 5780.48 3675.85 360.15 2424.28 190.19 2287.31 67.46 2199.85 2228.65 39.70 OSF1.50 Pass 0500.00 4084.69 780.67 4647.06 5773.43 367449 353.39 2422.82 190.29 2333.14 87.32 2245.81 2274.56 40.55 OSF1.50 Pass 0550.00 4084.95 751.42 4687.61 5766.56 3873.16 346.81 2421.35 190.38 2379.07 87.20 2291.87 2320.59 41.41 OSF1.50 Pass 0600.00 4085.20 722.17 4728.16 5759.86 3671.85 340.41 2419.88 190.46 2425.12 87.08 2338.04 2366.71 42.28 OSF1.50 Pass 0650.00 4085.45 692.81 476871 5753.33 3670.57 334.17 2418.42 10054 2471.26 86.96 2384.31 241294 43.14 OSF1.50 Pass 0700.00 4085.70 86366 4809.26 5746.95 3669.32 328.06 2416.97 190.62 2517.51 86.84 2430.67 2459.26 44.01 OSF1.50 Pass 0750.00 4085.95 634.41 4849.81 5740.72 3668.09 322.16 2415.52 190.70 2563.85 86.74 2477.12 2505.67 44.87 OSF1.50 Pass 0800.00 4086.20 605.16 4890,36 5733.15 3666.59 314.95 2413.72 190.79 2610.28 86.66 2523.62 2552.15 45.72 OSF1.50 Pass 0850.00 4086.45 575.91 4930.91 5724.08 366461 306.33 2411.54 190.80 2656.78 8663 2570.15 2598.67 48.56 OSF1.50 Pass 0900.00 4086.44 548.66 4971.46 5715.15 3663.06 297.85 2409.38 18976 2703.31 86.60 2616.71 2645.22 47.39 OSF1.50 Pass 0950.00 4086.10 51741 5012.01 5708.35 366136 289.50 2407.18 189.49 2749.85 86.58 2663.27 2691.78 48.22 OSF1.50 Pass 1000.00 4085.72 488.16 505256 5697.70 359.69 281.30 2405.00 189.61 2796.45 86.55 2709.90 2738.39 49.05 OSF1.50 Pass 1050.00 408535 458.91 5093.11 5689.21 365806 27325 2402.84 189.72 2643.11 86.53 2756.58 2785.07 49.88 OSF1.50 Pass 1100.00 4084.98 429.66 5133.66 5680.87 365648 285.35 2400.68 189.83 2889.83 86.51 2803.33 2831.81 50.72 OSF1.50 Pass 1150.00 4084.61 400.41 5174.21 5672.68 365493 257.59 2398.54 189.94 2936.62 86.49 2850.13 2878.60 51.55 OSF1.50 Pass 1200.00 4084.24 371.18 5214.78 5664.62 3653.42 249.98 2396.41 190,04 2983.46 86.47 2896.99 2925.45 52.38 OSF1.50 Pass 1250.00 4083.87 341.92 5255.31 5656.71 3651.94 242.49 2394.29 190.15 3030.35 86.45 2943.90 2972.36 53.22 OSF1.50 Pass 1300.00 408349 312.67 5295.86 5648.93 3650.50 235.15 2392.18 190.25 307730 86.44 2990.87 301932 5405 OSF1.50 Pass 1350.00 4083.15 28342 5336.41 564020 3648.89 226.90 2389.79 190.82 312431 86.42 3037.90 3066.35 54.89 OSF1.50 Pass 1400.00 4083.16 254.17 5376.96 5630.36 3647.09 217.62 2387.08 192.21 3171.41 86.38 3085.03 3113.47 55.75 OSF1.50 Pass 1450.00 4083.60 224.92 5417.51 5620.70 3645.33 208.51 2384.39 19363 3218.60 86.33 3132.28 3160.70 56.61 OSF1.50 Pass 1500.00 408430 195.67 5458.06 5611.18 3643.60 199.54 2381.72 193.84 3265.86 8630 3179.57 3207.98 57.46 OSF1.50 Pass 1550.00 4085.00 166.42 5498.61 5601.78 3641.91 190.68 2379.06 193.93 331716 86.29 3226.87 3255.28 58.30 OSF1.50 Pass 1600.00 4085.70 137.17 5539.15 559249 364024 181.94 2378.41 194.02 3360.49 86.28 3274,21 3302.61 59.14 OSF1.50 Pass 1650.00 4086.40 107.92 5579.70 558332 3638.60 173.30 2373.78 194.10 3407.65 86.27 3321.58 3349.98 59.98 OSF1.50 Pass 1700.00 4087.10 78.67 5620.24 5574.25 3636.99 164.78 2371.16 194.18 345525 86.26 3368.98 3397.38 60.82 OSF1.50 Pass 1750.00 4087.80 4942 5660.79 5565.30 363541 156.36 2368.56 194.27 3502.68 8626 341642 3444.81 61.65 OSF1.50 Pass 1800.00 4088.50 20.17 570134 5556.45 3633.85 148.04 2365.97 194.35 3550.14 8626 3463.88 3492.28 62.49 OSF1.50 Pass 1850.00 4089.18 -9.08 5741.88 5548.76 3632.50 140.81 2363.70 193.97 3597.63 86.23 3511.39 3539.78 63.35 OSF1.50 Pass 1900.00 4089.52 38.33 5782.43 5542.54 3631.41 134.97 2381.85 192.63 3645.12 86.18 3558.93 3567.30 64.22 OSF1.50 Pass 1950.00 4089.56 -67.58 5822.98 5536.39 3630.33 12921 2360.01 192.38 3692.81 88.14 360647 3634.83 65.09 OSF1.50 Pass 2000.00 4089.59 -96.83 586353 5530.33 3629.26 123.53 2358.19 192.45 3740.14 86.09 3654.05 388239 65.96 OSF1.50 Pass 2050.03 4089.62 -126.08 5904.09 552437 362820 117.95 2358.37 192.51 3787.71 86.05 3701.66 3729.99 68.83 OSF1.50 Pass 2100.00 4089.65 -15533 5944.64 5518.49 362716 112.46 235457 192.57 3835.33 8601 374932 3777.83 6771 OSF1.50 Pass 2150.00 4089.68 -184.58 5985.19 5512.71 3626.13 107.05 2352.79 192.63 3882.97 85.97 3797.00 3825.30 68.58 OSF1.50 Pass 2200.00 4089.71 -213.84 6025.74 5507.01 3625.11 101.73 2351.02 192.68 3930.66 8593 3844.73 3873.02 69.48 OSF1.50 Pass 2250.00 4089.74 -243.09 6066.29 550139 3624.11 096.49 2349.27 192.74 3978.36 85.90 3892.49 3920.76 70.33 OSF1.50 Pass ' 2300.00 4089.77 -272.34 6106.84 5495.86 3823.11 081.33 2347.52 192,79 4028.14 8588 3940.28 3988.54 71.20 OSF1.50 Pass 235000 4089.84 -301.59 6147.39 5490.40 3622.13 088.25 2345.80 193.52 4073.93 85.82 3988.12 4016.37 72.09 OSF1.50 Pass 2400.00 409027 -330.84 6187.93 5485.05 3621.17 081.27 2344.09 194.88 4121.80 85.76 4036.04 4064.27 72.98 OSF1.50 Pass 2450.00 4090.87 360.10 6228.48 5479.79 3620.21 076.38 2342.41 194.92 4169.72 85.73 4083.99 4112.21 73.86 OSF1.50 Pass 250000 4091.46 -389.35 6269.02 5474.60 3619.27 071.56 2340.73 194.96 4217.66 85.69 4131.97 4180.18 74.74 OSF1.50 Pass 2550.00 4092.05 -41861 6309.57 546949 3618.34 066.81 2339.07 195.00 4265.64 85.67 4179.98 4208.18 75.62 00F1.50 Pass 2600.00 4092.65 -447.86 6350.11 5464.45 3617.43 062.14 2337.43 195.04 4313.655 85.64 4228.01 4256.20 76.49 OSF1.50 Pass 2650.00 4093.24 -477.12 6390.65 5459.47 3616.52 057.53 2335.79 195.08 4381.68 85.61 4278.08 4304.26 77.37 OSF1.50 Pass 2700.00 4093.83 -506.37 6431.20 5455.59 3615.81 053.93 2334.51 195.11 4409.75 85.57 4324.18 4352.35 78.26 OSF1.50 Pass 2750.00 4094.42 -535.63 6471.74 5452.16 3615.18 050.75 2333.37 195.13 4457.85 85.53 4372.31 4400.47 79.15 OSF1.50 Pass 2800.00 4095.02 -564.88 6512.29 5448.78 3614.56 047.63 2332.24 195.16 4505.97 85.50 4420.48 4448.62 80.03 OSF1.50 Pass 2850.00 4095.59 -594.14 6552.83 5445.45 3613.94 044.56 2331.12 19454 455413 85.46 4488.67 4496.80 80.92 OSF1.50 Pass 2900.00 4095.59 -623.39 659338 5442.15 3613.34 041.51 2330.01 19128 460226 85.43 4516.83 4544.95 81.81 OSF1.50 Pass 2950.00 409485 -65263 663393 5438.87 3612.73 038.49 2328.89 189.93 465034 85.40 4564.94 4593.05 82.70 OSF1.50 Pass 3000.00 409402 -681.87 6674.48 5435.64 3612.13 035.51 2327.78 189.96 4698.45 8537 4613.08 4641.18 83.58 OSF1.50 Pass 3050.00 4093.20 -711.11 8715,03 5432.45 3611.54 032.58 2326,69 190.00 474658 8534 4661.24 4889.33 84.46 OSF1.50 Pass 3100.00 4092.37 -740.35 675558 5429.32 3810.96 029.70 2325.60 190.03 4794.74 85.32 4709.42 4737.51 85.35 OSF1.50 Pass 3150.00 4091.55 -769.59 6796.13 5426.23 3610.38 026.86 232453 190.07 4842.93 85.29 4757.64 4785.72 86.23 OSF1.50 Pass 3210.00 4090.73 -798.83 683888 5423.19 3609.82 02407 2323.48 190.10 4891.15 85.27 4805.89 4833.95 87.12 OSF1.50 Pass End of results Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 8 of 24 Field: Nikedchug Well: SPo8-N7 Structure: Spy Island Borehole: SPo8-N71.1 Slot SPo8 Trajectory: SP08-N7L1 Client Eni Petroleum Type: Der Survey Coordinate System: NAD27 Alaska Stale Rene,Zone 04,US Feet Nola Reference: True Grid Convergence Angle: 0.090306361 Grid Scale Factor: 0999903155 Magnetic Declination: 19639° Magnetic DeclineSon Date: October 30.2013 Magnetic Model: BGGM 2013 Reference Point 11250111g fasting flevatlon Structure Unc Slot Une. 6053658800(ftUS) 511676.160(SUS) 53.930(ft)MSL 0.000(ft)(1 sigma) 0.000(ft)(1 signor) Trelectory Error Model;ISCWSAO 3-0 95.000%Confidence 2.7965 sigma .Burvevina Pros;As Drilled Description MD From(It) MD To(f9 EOU Freq Survey Tool Type Hole Size(In) Casing Diameter(in) Borehole I Survey 0.000 40.830 198.425 SLB_NSG+SSHOT-Depth Only-No Global 16.000 13375 SP08N7/SPO8-N7 40.830 40.830 Act-Sfis SLB NSG+SSHOT-Depth Only-No Global 16.000 13.375 5P08-N7/SP08N7 40830 579980 ActS9rs SLS_NSG+SSHOT-No Globe 16000 13.375 SP08N7/SP08N7 579980 2609640 Act-Stns SLB_MWD+GMAG-NO Globe 16.060 13.375 SP08N7/5P08N7 2609640 2703.480 Act-Stns SLB_MWD-INC_ONLY_FILLER-No Globs 12.250 9625 SP08N7/SP08-N7 2703480 7789.190 ActSSrs SLB_MWD+GMAG-No Globe 12.250 9.625 5P08-N7/5P08-N7 7789.190 7791.000 Act-Stns SLB_MWD+GMAG-No Globe 12250 9.625 SP08-N7L115P08N7L1 7791.000 7899.430 Act-Stns SLB_MVuO-INC_ONLY_FILLER-No Globe 8.750 5.500 SP08-N7L1/SP08-N7L1 7899.430 15912.840 Act-Stns SLB_MWD+GMAG-NO Globe 8.750 5.500 SP08-N7L7 15P08N7L1 15912.840 15977.000 Act-Stns SLB BLIND+TREND-No Globe 8 750 5.500 SPo8-N7L7/SP08-N7L1 Minimum A towable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azlm Ct-Ct Distance Separation Reference Clearance OSF Rule Stall (ft) (ft) (ft) (t) (ft) (ft) (ft) (ft) (°) (ft) (6) (ft) (ft) Al local minima indicated. Results blared.Depth 7100 00 ft c MD c 17377.37 ft Results filtered:Ct-Ct separation<=1500.00 ft Results highlighted Ct-Ct separation ne 1320.008 7100.00 405527 2792.55 1911.91 7410.18 397944 285481 1980.56 69.75 11975 94.70 2505 56.26 190 OSF1.50 Warning 7150.00 4057.55 276843 1955.65 7364.38 3973.81 281801 2007.24 8024 110.15 89.07 21.0 50.41 1.8 OSF1.50 Warning 7179.00 4059.24 275422 1980.87 7338.15 397051 279672 202219 86.95 106.71 8464 220 499 190 OSF1.50 Warning 7200.00 4060.62 274375 199902 7319.33 3968.11 2781.35 2032.79 92.:11111111111111M 81.09 2432 51 00 1.96 OSF1.50 Naming 725000 4063.58 2717.77 2041.64 7275.40 3962.11 2745.06 2056.79 105.22 106.16 72.81 33.35 57.26 2.20 OSF1.50 Warning 7300.00 406608 2690.36 2083.37 7232.14 3955.55 2708.73 2079.36 117.55 112.12 65.91 46.21 67.82 2.57 OSF1.50 Warning 735000 406810 2661.54 2124.18 7187.73 3948.42 2871.04 2101.73 128.89 122.14 61.93 60.21 80.50 2.98 OSF1.50 Warning 7400.00 4069.65 263136 2164.01 714291 3941.16 2632.77 2123.90 138.62 134.61 61 A7 73.14 93.27 3.32 OSF1.50 Warring 745000 407073 259985 2202.82 7098.88 393388 2594.93 2145.19 146.74 148.57 64.48 84.08 105.22 3.49 OSF1.50 Warning 7500.00 4071.33 256705 7140.55 7055.08 392828 2556.98 2185.71 153.65 163.53 69.02 94.50 117.15 3.59 OSF1.50 Warning 7550.00 407148 2533.00 2277.18 7011.50 391838 2518.94 2185.43 159.59 179.01 7206 106.95 130.62 3.76 OSF1.50 Warning 7600.00 4071.11 2497.74 2312.60 6968.09 3910.15 2480.74 2204.33 164.77 19473 74.54 120.19 144.68 3.95 OSF1.50 VWrning 7650.00 4070.44 2461.92 2347.48 6924.34 390160 2441.89 2222.57 18602 210.97 76.62 134.16 159.41 4.16 OSF1.50 Warning 7700.00 406983 2427.23 2383.48 6881.42 3893.47 240325 2239.36 186.06 229.02 79.45 14957 175.70 4.36 OSF1.50 VWming 775000 4069.31 2393.82 242067 8839.20 3885.78 2364.73 2254.84 188.23 24907 82.39 106.67 193.78 4.57 OSF1.50 Warning 7800.00 406888 2361.73 2459.01 6796.87 3878.30 2325.85 2269.84 186.40 270.91 85.40 185.51 21362 4.80 OSF1.50 Warning 7850.00 4068.53 2330.99 2498.44 6755.89 3871.28 2288.04 2283.98 186.42 29452 8838 206.14 235.24 5.04 05F1.50 Pass 7900.00 4068.16 2301.51 2538.82 6716.39 3864.55 2251.49 2297.36 167.35 31978 91.23 228.55 258.60 5.30 OSF1.50 Pass 7950.00 4067.66 227225 2579.36 6677.33 3857.86 2215.27 2310.39 189.70 345.85 9380 252.05 282.96 5.58 OSF1.50 Pass 8000.00 4067.16 2243.00 2619.91 6636.87 3850.93 217771 2323.71 17184 372.50 96.26 27624 307.97 5.85 OSF1.50 Pass 8050.00 4066.67 221375- 2660.45 6596.09 384405 2139.81 2337.11 173.75 399.48 9861 30087 333.38 6.13 06F1.50 Pass 8100.00 4066.17 2184.49 2701.00 6558.11 383766 2104.49 234951 175.33 426.80 100/5 326.35 35948 643 05F150 Pass 8150.00 406568 2155.24 2741.55 6522.89 3831.25 2071.77 2380.87 178.60 45479 101.90 352.89 388.50 675 OSF1.50 Pass 820100 4065.18 2125.98 2782.09 6488.06 3824.39 2039.47 2371.95 177.87 48341 103.14 380.27 411.30 709 OSF1.50 Peso 825000 4064.68 2(96.73 2822.64 6454.42 3817.41 2006.26 2382.39 178.58 512.63 104.22 406.41 442.80 7.44 OSF1.50 Pass 830000 4064.19 2067.48 2863.18 6421.54 381048 1977.05 2392.19 179.40 542.47 105.18 43728 471.99 7.80 OSF1.50 Pass 8350.00 4063.70 2038.22 290373 6389.40 3803.62 1947.62 2401.39 180.22 572.88 106.11 466.77 50179 8.17 OSF1.50 Pass 8400.00 4063.72 2008.97 2944.28 6360.15 3797.26 192021 2409.38 181.47 004.18 10678 497.39 53262 8.58 OSF1.50 Pass 8450.00 4084.62 1979.72 298482 6331.81 3790.95 1893.57 2416.68 182.87 636.47 107.34 529.14 584.56 897 OSF1.50 Pass 8500.00 4066.29 1950.19 3025.35 6304.35 378470 1867.70 2423.39 183.45 669.70 107.81 561.90 597.47 9.40 OSF1.50 Pass 8550.00 4068.09 1921.25 3065.87 6279.30 3778.92 1844.01 2429.13 183.79 703.58 108.21 595.36 831.08 9.83 05F1.50 Paas 8600.00 4069.88 1892.02 310640 6255.68 3773.55 1821.54 2434.07 184.12 738.10 108.55 629.56 665.38 10.29 OSF1.50 Pass 8650.00 4071.67 1862.79 3146.92 6232.89 376845 1799.75 2438.40 184.45 77325 10891 66434 70029 1074 OSF1.50 Pass 8700.00 407348 1833.55 3187.45 6210.90 3763.59 1778.84 2442.17 18477 809.00 109.24 699.75 735.81 1120 OSF1.50 Pass 8750.00 4075.28 1804.32 3227.97 619136 3759.33 1759.81 2445.16 185.06 845.33 109.47 735.87 772.00 11.68 OSF1.50 Pass 8870.00 4077.05 1775.09 3268.50 6173.39 3755.43 174243 2447.55 185.33 882.31 109.80 772.71 808.89 1218 OSF1.50 Pass 8850.00 4078.84 174586 3309.02 6156.16 3751.71 1725.72 2449.51 185.59 919.88 109.74 81014 846.36 12.68 OSF1.50 Paas 8900.00 4080.49 1716.62 3349.55 6139.61 3748.16 1709.64 2451.10 185.25 957.97 109.87 848.11 884.37 13.19 OSF1.50 Pans 8950.00 4081.35 1687.38 3390.10 6123.65 3744.74 1694.09 245234 113449 996.36 94.10 902.28 933.27 16.05 OSF1.50 Pass ' 9000.00 4081.72 1658.14 3430.85 6108.28 374148 1679.10 2453.28 184.73 1035.11 9372 941.39 972.28 16.74 OSF1.50 Pns 9050.00 4082.10 1628.89 347121 6093.51 3738.34 1884.69 2453.95 184.99 1074.36 93.35 981.01 1011.77 17.45 OSF1.50 Pns 9100.00 4082.45 1599.65 3511.76 6079.32 3735.31 1650.84 2454.38 185.25 1114.09 92.99 1021.09 1051.74 18.16 OSF1.50 Pass 9150.00 4082.85 1570.41 3552.31 6065.68 3732.38 1637.52 245460 185.49 1154.26 92.85 1061.61 1092.14 18.89 OSF1.50 Pass 9200.00 4083.23 1541.16 3592.87 6052.57 3729.57 182471 2454.63 185.72 1194.84 92.30 1102.54 1132.95 19.83 05F1.50 Pns 9250.00 4083.80 1511.92 363342 6039.95 372685 1612.39 2454.48 185.93 1235.83 91.98 1143.85 1174.15 20.37 05F1.50 Pass i 9300.00 4083.98 148267 3673.98 6027.81 372423 1600.53 245419 186.14 1277.18 9165 1185.53 1215.73 21.13 OSF1.50 Pass 9350.00 4084.36 1453.43 3714.53 6015.79 3721.62 1588.81 2453.75 186.38 1318.89 91.35 1227.54 1257.64 21.89 OSF1.50 Pass 9400.00 1084.97 1424.18 3755.08 8001.46 3718.56 1574.83 2453.06 187.23 1360.96 91.11 1289.85 1298.86 22.85 OSF1.50 Pens 945000 4085.75 1394.93 3795.62 5987.59 3715.64 1581.30 2452.25 187.44 1403.32 9090 1312.42 1342.36 23.42 OSF1.50 Pns 950000 4088.53 1365.68 3838.16 5974.15 3712.86 1548.18 2451.33 187.86 144592 9069 135524 1385.11 24.18 06F1.50 Peso 955002 4087.31 1336.42 3876.71 5961.12 3710.22 1535.46 2450.31 187.86 1488.76 9048 1398.27 1428.08 24.96 OSF1.50 Pens 9600.00 4088.08 1307.17 3917.25 5948.49 3707.71 152313 244920 18806 1531.82 9029 1441.54 1471.27 25.74 05F1.50 Pass 9650.00 4088.86 127792 395779 5936.23 3705.31 1511.17 2448.02 188.25 1575.10 90.10 1485.00 151468 26.52 OSF1.50 Pass I 9700.00 4089.64 1248.66 3998.33 5924.34 3703.03 149956 2446.76 188.44 161858 89.91 1528.67 155829 27.31 OSF1.50 Pass 9750.00 409042 121941 4038.87 5912.38 3700.75 1487.90 2445.39 188.63 166226 8971 157255 1602.10 28.11 OSF1.50 Pass 9800.00 4091.19 1190.16 407942 5900.74 3698.55 147656 244398 188.81 1706.12 89.51 161661 164609 28.92 OSF1.50 Pass 9850.00 4091.90 1160.90 4119.96 588941 369640 1465.53 2442.52 188.30 1750.15 89,32 1660.82 1690.24 2973 OSF1.50 Pass I • • • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 9 of 24 1 • • • • Trajectory:SP04-SE7L1(P3)Vs.SP08-N7L1 Minimum Allowable • Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (8) (8) (8) (8) (6) (8) (2) (ft) (') (8) (8) (8) (8) 9900.00 409168 113165 4160.51 5878.30 3694.31 454.73 244101 186.84 1794.18 8914 1705.04 1734.40 30.54 OSF1.50 Pass 9950.00 4091.11 1102.40 4201.05 5867.43 3692.26 444.18 2439.47 186.24 1838.22 8898 1749.25 1778.55 31.35 OSF1.50 Pass 10000.00 4090.23 1073.15 4241.60 5856.83 3690.27 433.87 2437.68 186.43 188241 8582 1793.59 182284 3218 OSF1.50 Pass 10050.00 4089.35 104391 428214 5848.50 3688.33 423.85 2436.28 186.61 192676 88.66 1838.09 1867.29 32.98 OSF1.50 Pass 10100.00 4088.47 1014.66 4322.68 5836.43 3680.45 414.10 2434.65 186.79 1971.26 8851 1882.75 1911.90 33.80 OSF1.50 Pass 10150.00 406760 98541 436323 5827.16 3684.72 405.13 2433.09 186.95 2015.91 88.36 1927.56 1956.65 34.62 OSF1.50 Pass 10200.00 4086.72 956.17 4403.77 5818.83 3683.18 397.07 2431.63 187.09 2080.73 8821 1972.52 2001.57 35.48 OSF1.50 Pass 10250.00 4085.84 92692 4444,32 5810.72 3881.63 389.25 2430.17 187.23 2105.69 8806 2017.63 2046.62 38.29 OSF1.50 Pass • 10300.00 4084.96 89767 448486 5802.83 3680.13 381.83 242870 187.38 2150.79 87.91 2062.88 2091.83 37.13 OSF1.50 Pass 10350.00 4084.20 868.42 452541 5795.14 367867 374.23 2427.22 188.47 2196.06 8777 2108.30 2137.19 3798 OSF1.50 Pass • 10400.00 4084.19 839.17 456598 5787.70 367724 387.09 2425.75 190.10 2241.60 87.60 2154.00 2182.85 38.84 OSF1.50 Pass • 10450.00 4084.44 80992 460651 5780.48 367585 380.15 2424.28 190.19 2287.31 87.47 219985 222865 69.69 OSF1.50 Pass 10500.00 4084.69 780.67 4647.06 5773.43 367449 353.39 242282 19029 2333.14 87.33 224581 2274.56 40.55 OSF1.50 Pass 10550.00 408495 751.42 4687.61 5768.56 3673.16 346.81 2421.35 190.38 2379.07 8721 2291.87 2320.58 41.41 OSF1.50 Pass 10600.03 4085.20 722.17 4726.16 5759.86 3671.85 340.41 2419.88 190.46 2425.12 87.08 2338.03 2366.71 42.27 OSF1.50 Pass 1065000 4085.45 69291 476871 5753.33 3670.57 334.17 2418.42 190.54 247126 8697 2384.30 2412.93 43.14 OSF1.50 Pass 10700.00 4085.70 663.66 4809.26 5748.95 3669.32 328.06 241697 19082 251751 86.85 2430.66 245925 4400 OSF1.50 Pass 10750.00 4085.95 634.41 4849.81 5740.72 3688.09 322.16 2415.52 180.70 2563.85 86.74 2477.11 2505.67 44.87 OSF1.50 Pass 1080000 4086.20 605.16 4890.36 5733.15 368659 314.95 2413.72 190.79 261028 8667 2523.81 2552.15 45.72 OSF1.50 Pass 10850.00 4086.45 57591 4930.91 5724.08 3664.81 308.33 2411.54 190.80 285678 86.64 2570.15 2598.67 46.55 0671.50 Pass 10900.00 4086.44 54666 4971.46 5715.15 366306 297.85 2409.38 18976 2703.31 86.61 2816.70 284522 47.39 OSF1.50 Pass 10950.00 4086.10 517.41 5012.01 5706.35 3861.36 289.50 2407.18 18949 2749.85 86.58 2863.27 2691.77 48.22 OSF1.50 Pass 1100060 4085.72 488.16 5052.56 5897.70 365969 281.30 2405.00 189.61 2796.45 86.56 2709.89 2738.39 49.05 OSF1.50 Pass 11060.00 4085.35 458.91 5093.11 5889.21 3658.06 273.25 2402.84 18972 2843.11 86.54 2758.57 2785.06 49.88 OSF1.50 Pass 11100.00 4084.98 429.66 5133.66 5680.87 3656.48 265.35 2400.68 18983 2889.83 86.51 2803.32 2831.80 50.71 OSF1.50 Pass 1115000 408461 400.41 5174.21 5872.68 3654.93 257.59 2398.54 189.94 2936.62 86.50 2850.12 2878.60 51.54 0571.50 Pass 11200.00 4084.24 37116 5214.76 586462 365342 249.98 2396.41 190.04 2983.46 8648 2888.98 2925.45 5238 OSF1.50 Pass 1125000 4083.87 34192 5255.31 5858.71 3651.94 24249 2394.29 190.15 3030.35 8646 2943.89 2972.36 53.21 OSF1.50 Pass 11300.00 4083.49 312.67 5295.86 5648.93 3650.50 235.15 2392.18 19025 307730 86.44 2990.86 3019.32 54.05 OSF1.50 Pass 1135000 4083.15 283.42 533841 5840.20 364889 226.90 2389.79 190.82 3124.31 86.42 3037.89 3068.34 54.69 OSF1.50 Pass 11400.00 4083.16 254.17 5376.96 5630.36 3647.09 217.62 238708 192.21 3171.41 8638 3085.03 3113.46 55.74 OSF1.50 Pass 11450.00 4083.60 224.92 5417.51 5620.70 364533 206.51 238439 19363 3218.60 86.33 313227 3160.69 56.60 OSF1.50 Pass 1150000 4084.30 19567 5458.08 5611.18 364360 199.54 2381.72 19384 3285.86 8630 3179.56 320797 57.45 OSF1.50 Pass • 11550.00 4085.00 166.42 5498.61 5601.78 364191 190.68 237906 19393 3313.16 86.29 322686 325527 58.29 0071.50 Pass 11600.00 4085.70 13717 553915 5592.49 364024 181.94 2376.41 194.02 3360.49 86.29 327420 330261 59.13 OSF1.50 Pass 11650.00 4088.40 10792 5579.70 5583.32 363860 173.30 237378 194.10 3407.85 86.28 3321.57 334998 59.97 OSF1.50 Pass 11700.00 4087.10 78.67 5620.24 5574.25 383689 164.78 2371.16 194.18 3455.25 86.27 3388.98 3397.38 60.81 OSF1.50 Pass 11750.00 4087.80 49.42 588079 5565.30 363541 158.38 2368.56 194.27 3502.68 88.27 3416.41 3444.81 61.65 OSF1.50 Pass 11690.00 4088.50 20.17 5701.34 5556.45 3633.85 148.04 2365.97 19435 3550.14 86.26 3463.87 349227 62.49 OSF1.50 Pass 11850.00 4089.18 -908 5741.88 554876 3632.50 140.81 2363.70 193.97 3597.63 88.24 3511.39 3539.78 83.34 OSF1.50 Pass 1190000 4089.52 38.33 5782.13 5542.54 363141 134.97 2361.85 19263 3645.12 88.19 355892 3587.30 64.21 OSF1.50 Pass 11950.00 4089.56 -67.58 5822.98 5536.39 3630.33 129.21 2360.01 19238 3692.61 86.15 360646 3634.82 65.08 OSF1.50 Pass • 1200000 4089.59 -9683 586353 5630.33 3829.26 123.53 2358.19 19245 3740.14 86.10 3654.04 3682.39 69.96 OSF1.50 Pass 12050.00 4089.62 -126.08 5904.09 5524.37 3628.20 117.85 235637 19251 3787.71 86.06 3701.65 372999 66.83 OSF1.50 Pass 12100.00 4089.65 -155.33 594464 5518.49 3627.16 112.48 235457 19257 3835.33 8602 374931 377762 6770 OSF1.50 Pass 12150.00 4069.68 -18458 5985.19 5512.71 3826.13 107.05 235279 192.83 3882.97 8598 3797.00 3825.30 86.58 OSF1.50 Pass 12200.00 4089.71 -213.84 6025.74 5507.01 3625.11 101.73 235102 19268 3930.66 85.94 384472 387301 69.45 OSF1.50 Pass 12250.00 4089.74 -243.09 6066.29 5501.39 3824.11 096.49 2349.27 192.74 397838 8590 3892.48 3920.76 70.32 OSF1.50 Pass 12300.00 4089.77 -272.34 610684 5495.86 3623.11 091.33 234762 192.79 1028.14 8587 394027 3988.54 71.20 OSF1.50 Pass 12350.00 408984 -301.59 6147.39 5490.40 3622.13 086.25 2345.80 193.52 4073.93 8583 3988.11 4016.36 7208 OSF1.50 Pass 12400.00 4090.27 -330.84 6187.93 5485.05 3621.17 081.27 2344.09 194.88 4121.80 85.77 4038.04 4064.27 72.98 OSF1.50 Pass 12450.00 4090.87 -360.10 6228.48 5478.79 3820.21 076.38 2342.41 194.92 416972 8573 4083.98 411221 73.85 OSF1.50 Pass 12500.00 4091.46 -38935 8289.02 5474.60 3619.27 071.58 2340.73 194.96 4217.86 8570 4131.96 4160.17 7473 OSF1.50 Pass 12550.00 4092.05 -41861 630957 5489.49 3818.34 068.81 2339.07 195.00 4285.64 8587 4179.97 4208.17 7561 OSF1.50 Pass 12600.00 4092.65 -447.86 6350.11 5464.45 3617.43 082.14 2337.43 195.04 4313.65 85.64 4228.01 4256.20 76.19 OSF1.50 Pass 12650.00 4093.24 -477.12 6390.65 545947 361852 057.53 2335.79 185.08 436168 85.82 4278.07 4304.25 77.38 OSF1.50 Pass 1270000 4093.83 -506.37 6431.20 5455.59 3615.81 053.93 2334.51 195.11 440975 8558 4324.17 4352.34 78.25 OSF1.50 Pass 1275000 409442 -53563 8471.74 5452.16 3615.18 050.75 2333.37 195.13 445785 8554 4372.30 4400.46 79.14 OSF1.50 Pass 12800.00 4095.02 564.88 651229 5448.78 3614.56 047.83 233224 195.18 450597 85.51 4420.47 4448.61 80.03 OSF1.50 Pass 12850.00 4095.59 -594.14 6552.83 544545 3613.94 044.58 2331.12 194.54 455413 69.47 4468.68 4496.80 80.92 OSF1.50 Pass 12900.00 4095.59 623.69 6593.38 5442.15 361334 041.51 2330.01 19128 4802.26 85.44 4518.82 4544.95 81.80 OSF1.50 Pass • 1295000 4094.85 -85263 6633.93 5438.87 361273 038.49 2328.89 18993 465034 85.41 456494 4593.05 82.69 OSF1.50 Pass 13000.00 4094.02 681.87 6674.48 5435.64 3612.13 035.51 2327.78 189.98 4698.45 85.38 4613.07 4641.17 83.57 OSF1.50 Pass 13050.00 4093.20 -711.11 6715.03 543245 3611.54 03258 2326.69 190.00 4746.58 8535 466123 4889.32 84.46 0571.50 Pass 13100.00 4092.37 -740.35 6755.58 5429.32 3610.96 029.70 2325.60 19003 4794.74 85.32 4709.42 4737.50 85.34 OSF1.50 Pass 1315000 4091.55 -769.59 6798.13 5428.23 3610.38 028.88 2324.53 190.07 4842.93 85.30 475783 4785.71 86.22 OSF1.50 Pass 1320000 4090.73 -79883 6836.68 5423.19 3699.82 024.07 2323.46 190.10 4891.15 85.27 4805.88 4833.95 87.11 OSF1.50 Pass End of results Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 10 0124 Field: Nikaifchuq Weft: S)07SE4 Structure: Spy Island Borehole: S107-SE4 Slot SP07 Trajectory: S107-SE4(P3) Client: Eni Petroleum Type: De7Plan Coordinate System: NAD27 Alaska State Plane.Zone 04,US Feet North Reference: True Grid Convergence Angle: 0.09036679' Grid Scale Factor 0.999900155 Magnetic Declination: 19.119° Magnetic Declination Date: October 01,2014 Magne8e Model:• BOOM 2013 Reference Point Northing Luypg Flevaeon Structure Unc. Slot Unc 6053660 340(BUS: 511683970(ftUS) 54.100(ft)MSL 0.000((t)(1 sigma) 0.000(8)))sigma) Tralectory Error Model:ISCWSAO 3-9 96800%Confidence 2.7956 sigma Survevine Prow While Drilling Description Part MD From(ft) MD To(S)EOU Freq(It) Survey Tool Type Hole Size(In) Casing Diameter(In) Borehole I Survey 1 0.000 41.000 1/100.000 SLB NSG+SSHOT-Dep8r Only-No Globe 16.000 13.375 S107SE4/S107-SE4(P3) 1 41.000 1200000 1/100.000 SLB NSG*SSHOT-No Globe 18.000 13.375 S107-5E4/SI07SE4(P3) 1 1200.000 2700.000 1/100.000 SLBMWD+SAG-No Globe 16.000 13.375 S107-5E4/5107-SE4(P3) 2 1200.000 3177.389 1/100.000 SLB_b_TND+GMAG-No Gioba 18.000 13.375 S107SE4/S107SE4(P3) 2 3177.389 4870.000 1/100.000 SLB_MWD+SAG-No Globe 12.250 9.625 S107SE4/S107-SE4(P3) 3 3177.389 6058.383 1/100.000 SLB_AMJD+GMAG-No Globe 12.250 9.625 5107-SE4/S107SE4(P3) 4 6015.240 7510.000 1/100.000 SLB_MWD+SAG-No Globs 8.750 5.500 S107-5E4/S107SE4(P3) 5 8058.363 16128.609 1/100.000 SLB_MWD*GMAG-No Globe 8.750 5.500 SI07SE4IS107-SE4(P3) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset ND Offset NS Offset EW North Aim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (It) (5) (5) (ft) (ft) (5) (ft) (°) (ft) (ft) (ft) (ft) All local minima indicated. Results filtered:Depth 7100.00 ft e=MD cc 17377.37 5 Results filtered:Ct-Ct soperetion on 1500.00 ft Results highlighted'.Ct-Ct separation c 1320.00 ft 7 100 00 4055.27 279255 191191 6071 99 4026.70 1805.31 1350.25 206.64 1136.1 115 24f l020.9b6 1058.94 14.93 OSF1.90 ace 7150.00 4057.55 2768.43 195565 6117 30 4030.09 1782.81 1389.44 207.84 1137.0 115.70 1021.31 1059.47 14.88 OSF1.50 mus 7200.00 4060.62 2743.75 1999.02 6153.68 4032.01 1784.57 1420.85 208.97 113749 11803 1021.46 1059.73 14.85 OSF1.50 ass 7250.00 4063.58 271777 204164 618196 403332 1749.95 1445.02 210.77 113734 117.95 1019.39 1058.30 1460 OSF1.50 ess 7300.00 4066.08 2690.36 2083.37 6210.23 4034.48 1734.87 1488.91 212.60 113845 11981 1016.54 1056.10 14.35 OSF1.50 ass 7350.00 4068.10 2661.54 2124.18 6238.51 4035.47 1719.33 1492.52 214.46 1134.82 12726 1007:57 1049.58 13.49 OSF1.50 aSS 7400.00 4069.65 2631.36 2164.01 6266.80 4036.32 1703.34 151584 216.34 1132.48 13493 997.52 104209 12.69 OSF1.50 ace 7450.00 4070.73 2599.85 220282 6295.09 4037.00 1686.91 1538.86 218.26 1129.35 145.08 984.27 1032.23 11.76 OSF1.50 aSs 7500.00 4071.33 256705 224055 632339 4037.53 1670.04 1561.57 22020 1125.52 152.71 97280 102330 11.13 OSF1.50 ass 7550.00 4071.48 2533.00 2277.16 6359.37 4038.01 1948.05 1590.04 22218 1120.88 153.06 987.82 1018.43 11.08 09F1.50 ass 7600.00 4071.11 249774 231260 6408.98 4038.62 1617.61 1629.22 224.22 1114.76 15381 96095 1011.81 10.95 OSF1.50 ass 7650.00 4070.44 2461.92 2347.48 645849 403923 158724 1668.31 22340 1107.84 154.79 953.05 1004.24 10.81 OSF1.50 ass 7700.00 4069.83 2427.23 238348 6508.19 4039.84 1556.75 1707.55 221.42 1102.51 155.82 948.69 998.22 10.89 OSF1.50 ass 7750.00 4069.31 2393.62 242067 6558.05 4040.46 1528.16 1746.92 219.46 1098.92 157.13 941.79 993.76 10.56 00F1.50 ass 7800.00 4068.88 236173 2459.01 6608.00 4041.07 1495.51 1786.38 217.49 1097.07 158.47 938.60 991.02 10.45 09F1.50 aSS 7850.00 4068.53 2330.99 2498.44 6696.74 4041.70 144239 1857.43 21554 1096.01 161.29 93471 988.07 10.26 OSF1.50 ass 7900.00 4068.16 2301.51 253882 6746.74 4041.78 1413.14 1897.97 214.43 1095.71 163.09 93262 988.57 10.14 OSF1.50 ass 7950.00 4067.66 227225 2579.36 6796.73 4041.85 138389 1938.52 214.48 1095.69 165.05 930.64 985.25 10.02 00F1.60 aSS 6000.00 4067.16 224300 2619.91 6846.73 4041.93 1354.64 197907 214.49 1095.68 187.13 928.55 983.85 9.90 OSF1.50 ass 6050.00 4066.67 2213.75 2660.45 6896.73 4042.00 1325.38 2019.61 214.52 1095.66 16937 928.29 982.34 9.76 OSF1.50 ass 8100.00 406617 218449 270100 6946.72 4042.08 1296.13 2060.16 21455 1095.65 171.72 923.93 980.76 9.63 OSF1.50 aSs 8150.00 4065.68 2155.24 274155 6996.72 4042.16 1286.88 2100.71 214.58 109563 17422 92141 979.07 949 OSF1.50 8200.00 4065.18 2125.98 278209 7046.72 404223 1237.63 2141.25 214.61 1095.62 176.82 918.79 97733 9.35 OSF1.50 aSS 8250.00 4064.68 2096.73 282264 7096.71 4042.31 1208.38 2181.80 214.64 109580 179.57 916.03 975.48 9.20 OSF1.50 am 6300.00 406419 2067.48 2863.18 7146.80 4042.42 1179.08 222242 214.67 109559 18237 91321 96.60 906 OSF7.60 ass 8350.00 4063.70 2038.22 2903.73 7187.17 4043.17 1149.61 226328 21474 1095.56 18526 91030 971.85 8.92 OSFI.50 8400.00 4063.72 2008.97 2944.28 7247.31 4044.00 1120.29 2303.91 214.81 1095.53 18820 907.33 98988 8.78 OSF1.50 ass 8450.00 4064.62 197972 2984.82 7297.31 4046.08 1091.05 2344.44 214.:•iG-1515. 19121 904.31 96764 8.64 OSF1.50 8500.00 4066.29 1980.49 3025.35 7347.31 404755 1061.81 2384 97 214.82 194 37 901.16 965.54 8.50 OSF1.50 ass 8550.00 4068.09 1921.25 3065.87 7397.30 4049.02 1032.57 2425.50 214.81 1095.53 197.67 897.86 963.34 8.36 OSFI.50 ass 8600.00 406988 189202 3106.40 7447.30 4050.50 1003.33 2486.03 214.79 1095.54 201.04 894.5500) 961.8111 8.22 O5F1.50 act 8650.00 4071.67 186279 74 10 57 214.77 109554 1 OSF1.50 aSS 8700.00 4073.46 183355 3187.45 754730 4053.45.92 7497.30 405127 9944.86 2547710 21476 1095.55 204.801 8 10 9144$ 974.4/ (I.1 OSF1.50 ass 875000 4075.26 1804.32 3227.97 759730 4054.92 915.62 2587.63 214.74 1095.56 183.32 912.24 972.93 9.01 OSF1.50 ass 8800.00 4077.05 1775.09 3268.50 7647.30 4056.40 888.38 2628.16 214.72 1095.56 185.55 91001 971.9944�55s 4p 8.91 OSF1.50 aSs 8850.00 407884 3309.02 7697.10 4057.74 857 25 2668.54 214.70 1095.57 187.87 907.70 1 OSF1.50 ass 8900.00 4080.49 1716.62 334955 7746.71 4058.32 828.23 2708.77 214.64 109559 190.22' 3{{? 9 f 10� OOSF1.50 ass SF1.50 8950.00 4081.35 168738 339010 7796.67 4058.40 799.01 2749.29 214.60 1095.62 164.49 8 / 5b55 ass 9000.00 4081.72 1658.14 3430.65 7846.67 4058.48 769.75 2789.64 214.58 1095.63 185.29 900.34 985.03 10.01 OSF1.50 ass 9050.00 4082.10 1628.89 3471.21 7896.67 4058.55 740.50 2830.39 214.56 109565 166.11 929.54 984.50 9.96 OSFI.50 ass 9100.00 408248 1599.65 351176 7946.67 4058.63 711.25 2870.93 214.55 1095.66 166.95 928.72 98396 9.91 OSF1.50 ass 9150.00 4092.85 1570.41 3552.31 7996.67 405870 682.00 2911.48 214.53 1095.68 167.81 927.87 963.40 9.85 OSF1.50 ass 9200.00 408323 1541.16 3582.87 8046.67 4058.78 652.75 2952.03 214.52 1095.69 168.69 927.01 98283 9.80 OSFI.50 ass 9250.00 4083.00 151192 3633.42 0096.67 4058.85 623.50 2992.58 214.50 109571 16959 926.12 98224 9.75 OSF1.50 ass 9300.00 4083.98 148287 3673.98 8146.67 4058.93 594.25 3033.13 214.49 1095.73 170.51 925.21 981.64 970 OSF1.50 ass 9350.00 4084.36 1453.43 3714.53 8196.67 4059.00 564.99 3073.68 214.47 1095.74 171.45 924.29 981.04 9.64 OSF1.50 9400.00 4084.97 1424.18 3755.08 8247.88 4059.03 535.05 3115.23 214.45 1095.74 17237 923.37 98042 8.59 OSF1.50 ass 945000 408575 1394.93 379562 8297.87 4058.97 505.85 3155.81 214.41 109569 173.34 922.36 97973 954 OSF1.50 ass 950000 4086.53 1365.68 3836.16 8347.86 4058.90 47665 3196.39 214.37 109565 174.32 921.33 979.03 9.48 OSF1.50 ass 9550.00 4087.31 1336.42 3876.71 8397.86 4058.84 44745 3236.96 214.32 1095.61 17533 920.28 978.31 9.43 OSF1.50 ace 9600.00 4088.08 1307.17 391725 8447.85 4058.77 41825 3277.54 21428 1095.57 176.35 91922 977.59 9.37 OSF1.50 ass 9650.00 4088.86 1277.92 3957.79 8497.84 4058.71 389.05 3318.12 214.23 1095.52 17739 918.13 976.85 9.32 OSF1.50 ass 9700.00 4089.64 1248.66 3998.33 8547.84 4058.65 359.85 3358.70 214.19 1095.48 178.45 917.04 976.11 9.26 OSF1.50 9750.03 4090.42 121841 4038.87 859.83 4058.58 330.65 3399.28 214.15 1095.44 179.52 915.92 97535 9.21 OSF1.50 ass 9800.00 4091.19 1180.16 4079.42 8647.82 4058.52 301.45 3439.86 214.10 1095.40 180.61 914.79 974.59 9.15 OSF150 Me 9850.00 4091.90 118090 4119.96 8697.82 4058.45 272.25 3480.44 214.06 1095.36 18172 913.64 973.81 9.09 OSF1.50 aSS 993000 4091.88 1131.85 416051 8746.24 4058.18 243.95 3519.74 214041 1095.3 182.82 912.51 973.04 904 05F1.50 Ws 9950.00 4091.11 110240 4201.05 8793.82 4057.16 216.09 3558.29 21403 10953 183.92 911.45 972.35 8.98 00F1.50 10000.00 4090.23 1073.15 4241.60 8843.82 4055.69 186.79 359377 214.00 1095.47 18508 910.39 971.68 8.93 OSF1.50 ens • • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 11 of 24 Trajectory:SP04-SE7L1(P3)Vs.5107-SE4(P3) Minimum Allowable Traveling Cylinder AlloweNe Deviation from EOU-EOU Cantoaim Raferenoe MD Reference ND Reference NS Raferenoe EW Ofhet MO Offset TVD Offset NS Offset EW North Asim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (0) (9) (ft) (ft) (8) (ft) (9) (9) C) (ft) (6) (6) (ft) 0050.00 4089.35 104391 4282.14 8893.81 4054.23 157.48 383926 213.97 1095.57 18626 909.32 970.99 8.87 OSF150 Pass 0100.00 4088.47 1014.66 432268 8943.81 405277 128.18 3679.74 213.94 1095.67 187.44 908.23 970.30 8.82 OSF1.50 Pass 0150.00 4087.60 985.41 436323 8993.81 405131 98.88 3720.22 213.91 1095.77 18885 90712 963.60 8.76 OSF1.50 Pass 0200.00 4086.72 95617 440377 9043.80 404985 63.58 3780.71 213.87 1085.87 18987 90601 968.89 8.70 OSF1.50 Pass 025000 4085.84 92692 444432 9093.80 4048.39 40.27 3801.19 213.84 1095.97 19110 90487 968.16 865 OSF1.50 Pass 0300.00 4084.96 897.67 4484.86 9143.80 4046.92 10.97 384167 213.81 1096.07 192.34 903.73 967.44 659 OSF1.50 Pass 035000 4084.20 868.42 452541 9193.79 404546 -18.33 3882.15 213.78 109618 193.57 90281 966.72 8.54 OSF1.50 Pass 0400.00 4084.19 839.17 4565.96 9243.77 4044.00 -47.62 3922.62 21371 1096.31 194.74 901.57 966.07 8.49 0551.50 Pass 0450.00 4084.44 809.92 4606.51 929559 404283 -77.88 396460 21363 1096.42 19597 900.45 965.36 8.44 OSF1.50 Pass 0500.00 4084.69 780.67 4647.06 9346.49 4042.44 -107.76 4005.88 213.00 1096.45 197.17 89927 964.59 8.38 OSF1.50 Pass 0550.00 4084.95 751.42 4887.61 9396.49 404213 -137.01 4046.43 213.57 1096.47 198.41 89806 963.79 8.33 OSF1 00 Pass 0600.00 4085.20 722.17 4728.16 9446.48 404183 -166.26 4086.97 213.54 1096.49 19872 89677 962.93 8.28 OSF1.50 Pass 0650.00 4085.45 69291 4768.71 9498.48 4041.52 -195.51 4127.52 213.51 109151 201.06 89546 962.07 8.22 OSF1.50 Pass 0700.00 4085.70 663.66 4809.26 9546.48 4041.21 -22475 4168.07 213.48 1096.53 202.40 89414 961.19 8.17 OSF1.50 Pass 0750.00 4085.95 834.41 4849.81 9596.47 4040.91 -254.00 4208.62 213.45 1096.56 203.75 89280 960.31 8.11 0051.50 Pass 0800.00 4086.20 605.16 4890.36 9646.47 404060 -283.25 4249.16 213.42 1096.58 205.12 89146 959.42 8.06 OSF1.50 Pass 0850.00 4086.45 575.91 4930.91 9696.47 4040.29 -312.50 4289.71 213.39 1098.60 206.49 89011 958.53 8.00 OSF1.50 Pass 0900.00 0086.44 546.66 4971.46 9746.47 4039.99 -341.75 433026 213.38 1096.61 207.89 888.73 957.61 7.95 OSF1.50 Pass 0950.00 4086.10 51741 5012.01 9796.47 403968 -371.00 4370.81 213.38 1096.61 208.30 887.32 956.67 7.90 OSF1.50 Pass 1000.00 4085.72 488.16 5052.56 9847.86 4039.48 -401.03 441252 213.39 109656 210.68 885.89 955.70 7.84 0551.50 Pass 1050.00 4085.35 456.91 5093.11 9897.86 4039.32 -430.23 4453.10 213.40 1096.50 212.04 884.46 954.73 7.79 OSF1.50 Pass 1100.00 4084.98 429.86 5133.66 9947.86 4039.16 -459.44 4493.68 213.41 1096.43 213.47 882.96 953.71 7.74 OSF1.50 Pass 1150.00 4084.61 40041 5174.21 9997.86 4039.00 -48864 4534.27 21342 1096.37 214.93 88144 952.68 7.69 OSF1.50 Pass 1200.00 4084.24 371.16 5214.76 0047.86 403184 -517.85 4574.85 213.43 1098.30 216.39 79.91 951.64 . 7.63 OSF1.50 Pass 1250.00 4083.87 341.92 5255.31 0097.86 4038.63 -547.05 4615.44 213.44 1095.24 217.87 78.38 950.59 7.58 OSF1.50 Pass 1300.00 4083.49 31267 5295.86 014786 4038.53 -57625 4656.02 213.45 1096.18 219.35 78.83 949.54 7.53 OSF1.50 Pass 1350.00 4083.15 283.42 5338.41 0197.86 403837 -60548 469660 213.46 1096.11 220.81 7531 948.50 7.48 OSF1.50 Pass 1400.00 4083.16 254.17 5378.98 0248.05 4036.27 634.78 4737.35 213.46 109606 22216 73.90 94755 7.43 OSF1.50 Pass 1450.00 4083.60 224.92 5417.51 0298.57 4038.90 -664.29 4778.34 213.47 109801 22345 72.58 946.63 7.39 0051.50 Pass 1500.00 4084.30 195.67 5458.06 0348.38 404039 693.40 4818.74 213.51 109594 22474 71.21 945.71 7.35 OSF1.50 Pass 1550.00 4085.00 186.42 5498.61 0398.37 4042.23 -72262 485925 213.57 109590 228.20 889.70 944.69 7.30 0551.50 Pass 1600.00 4085.70 137.17 5539.15 0448.35 4044.07 -75184 4899.76 213.63 1095.85 227.74 868.11 943.62 7.25 OSF1.50 Pass 1660.00 4088.40 107.92 5579.70 049834 4045.91 -78107 4940.27 213.69 1095.81 229.29 866.52 94254 7.20 OSF1.50 Pass 1700.00 4087.10 78.67 5820.24 0548.33 404775 310.29 4980.79 21375 1095.77 230.85 864.92 941.48 7.15 OSF1.50 Pass 1750.00 4087.80 49.42 5660.79 0598.32 4049.59 -839.51 5021.30 213.81 1095.73 23242 863.31 940.37 7.10 OSF1.50 Pass 1800.00 4088.50 20.17 5701.34 0648.30 405143 -868.74 506181 213.87 1095.69 234.00 861.69 939.28 7.05 OSF1.50 Pass 1850.00 4089.18 4108 5741.88 0698.29 4053.27 -89796 5102.33 213.93 1095.65 235.58 860.07 938.19 7.00 OSF1.50 Pass 1900.00 408952 38.33 5782.43 0748.27 4055.11 -927.18 514283 214.00 109560 23718 858.42 937.07 6.96 OSF1.50 Pass 1950.00 4089.56 -67.58 5822.98 0798.23 405694 -956.39 5183.33 214.10 1095.54 238.79 858.75 935.94 6.91 OSF1.50 Pass 2000.00 408959 -9683 5863.53 0847.64 4058.73 X28 5223.37 214.1 240.39 855.10 934.82 6.86 OSF7.50 Pass 2050.00 4089.62 -12808 5904.09 0895.87 4059.87 -1013.52 5262.44 214.25 1 24188 853.56 933.79 6.82 OSF1.50 Pass 2100.00 4089.65 -155.33 5944.64 094586 4063.76 -1042.83 5302.93 214.29 109557 243.58 851.99 93277 6.77 OSF1.50 Pass 2150.00 4089.68 -184.58 5985.19 099585 406165 -1072.14 5343.43 21434 109562 24520 850.42 931.75 6.73 OSF1.50 Pass 2200.00 4089.71 -213.84 602574 104584 406253 -1101.44 5383.92 214.38 109568 246.83 848.85 930.72 6.68 OSF1.50 Pass 2250.00 4089.74 -243.09 6066.29 109584 4063.42 -1130.75 5424.41 214.43 109574 248.46 84728 929.69 6.64 OSF1.50 Pass 2300.00 4089.77 -272.34 6106.84 1145.83 4064.31 -1160.06 5464.90 21147 1095.80 250.10 845.69 928.65 6.60 0551.50 Pass 2350.00 4089.84 -301.59 6147.39 1195.82 406520 -1163.36 5505.39 214.52 1095.86 25171 844.14 927.64 6.55 OSF1.50 Pass 2400.00 4090.27 33084 618793 1245.82 4066.09 -1218.67 5545.89 214.55 1095.92 253.25 842.67 926.68 6.52 0051.50 Pass 245000 4090.87 -380.10 6228.48 1295.82 406697 -124798 558639 214.56 109599 254.90 841.09 925.65 647 0051.50 Pass • 2500.00 4091.46 -389.35 6269.02 1345.82 406786 -1277.29 562689 214.58 1096.05 256.55 839.50 924.61 6.43 OSF1.50 Pass 2550.00 4092.05 <7881 6309.57 1398.69 4068.77 -1308.27 5669.72 211.59 1096.10 25827 83763 923.51 6.39 0557.50 Pass 2600.00 4092.65 -44786 6350.11 1448.69 4063.45 -1337.47 5710.30 214.60 1096.04 25993 836.11 922.34 6.35 0051.50 Pass 2650.00 4093.24 47712 6390.65 149889 4070.13 -1366.67 5750.88 214.60 1095.97 26160 83437 921.17 631 OSF1.50 Pass ' 2700.00 409383 -506.37 643120 1548.63 407081 -1395.88 5791.46 214.61 1095.91 26327 832.64 919.93 827 OSF1.50 Pass 275000 4094.42 -535.63 647174 1598.69 4071.48 -1425.08 5832.04 214.61 109584 264.95 83089 918.80 6.23 OSF1.50 Pass 2800.00 4095.02 -56488 651229 1648.69 4072.16 -1454.28 5872.62 214.82 1085.78 26683 829.15 917.62 619 ' 055150 Pass 2850.00 4095.59 -594.14 6552.83 1698.69 4072.84 -1483.49 5913.20 214.82 109571 268.32 827.39 918.43 6.15 OSF1.50 Pass 2900.03 4095.59 623.39 6593.38 1748.68 4073.52 -1512.69 5953.77 214.64 1095.65 270.03 825.82 915.22 6.11 OSF1.50 Pass 2950.00 409485 ffi2.63 663393 1798.66 407420 -1541.88 5991.34 214.72 1095.57 27175 823.82 914.00 6.07 OSF1.50 Pass 3000.00 409402 68187 667448 1846.64 4074.88 -1571.07 6034.90 214.80 1095.49 27348 822.02 912.77 603 OSF1.50 Pass 3050.00 4093.20 -711.11 6715.03 1898.20 4075.49 -1800.02 6075.12 21487 1095.4 275.20 820.22 911.55 5.99 OSF1.50 Pass i 7 3100.00 4092.37 -740.35 675558 19433 4075.39 -1828.74 6114.98 214.91 278.91 81649 910.38 5.95 OSF1.50 Pass 3150.90 4091.55 -769.59 679613 1996.63 4074.48 -1657.56 6154.96 214.90 278.61 816.79 909.25 5.92 OSF1.50 Pass 3200.00 4090.73 -79983 683668 2046.62 4073.15 -1686.81 6195.49 214.88 1095.41 28032 815.10 908.13 5.88 0557.50 Pass 3250.00 4089.90 -828.07 687723 2096.62 4071.85 -1716.05 6236.02 214.85 1095.43 282.03 81340 907.00 5.84 OSF1.50 Pass 3300.00 4089.08 657.31 691778 2146.62 4070.54 -1745.29 6276.56 214.83 1095.45 283.75 811.70 905.87 5.81 OSF1.50 Pass 3350.00 4088.25 -886.58 6958.33 2196.62 4069.24 -1774.53 6317.09 214.80 109547 285.48 809.99 904.74 5.77 OSF1.50 Pass 3400.00 408764 -915.80 6398.88 224661 406793 -180378 6357.62 214.76 109549 28709 808.40 90389 5.74 OSF1.50 Pass 3450.00 4087.15 -945.06 703942 2296.61 4066.62 -1833.02 8398.15 214.74 1095.50 288.82 80668 902.55 5.71 OSF1.50 Pass ' 3500.00 4086.67 -974.31 7079.97 2346.60 406532 -1882.26 6438.66 214.70 1095.51 280.55 804.96 901.41 5.67 0551.50 Pass 3550.00 4086.18 -1003.57 7120.51 2398.59 4064.01 -1891.50 6479.21 214.65 1095.52 29228 803.24 900.26 5.64 0051.50 Pass 3600.00 408570 -103282 716106 2446.91 4062.95 -1920.93 652001 214.82 109553 293.95 801.58 899.18 5.81 OSF1.50 Pass 3650.00 4085.21 -108208 7201.60 2497.21 406271 -1950.38 6580.80 214.64 1095.52 29556 799.96 898.07 5.58 OSF1.50 Pass 3700.00 408473 -1091.34 7242.15 254721 406266 -1979.61 6601.35 214.86 1095.51 29732 798.19 896.88 5.54 OSF1.50 Pass 3750.00 4084.24 -1120.59 728269 2597.21 4062.61 -2008.86 6641.90 214.68 1095.49 299.09 796.40 895.63 5.51 OSF1.50 Pass 3800.00 4083.75 -1149.85 7323.24 2647.21 406256 -2038.11 8682.45 214.70 109548 30087 794.61 894.49 5.48 OSF1.50 Pass 3850.00 4083.35 -1179.10 736378 289720 4062.51 -2067.36 6723.00 21472 09546 302.59 79287 893.33 5.45 OSF1.50 Pass 3874.67 4083.30 -1193.54 7383.79 2721.88 4062.49 -2081.79 8743.01 214.7 30342 79204 89277 5.43 OSF1.50 Pass 3900.00 4083.36 -1208.38 740433 2747.20 4062.47 -2096.61 6763.55 21472 30423 791.23 892.23 5.42 OSF1.50 ' Pass 3950.00 4083.76 -1237.61 7444.88 2797.20 4062.42 -2125.86 6804.10 214.69 109547 305.86 769.61 891.16 5.39 0651.50 Pass 4000.00 4064.23 -1286.86 7485.43 284720 4062.37 -2155.11 6844.65 214.88 109548 307.54 767.94 890.05 5.36 OSF1.50 Pass 4050.00 4084.70 -1298.11 7525.98 2897.20 4062.32 -2184.36 6885.19 21483 1095.49 309.31 786.18 888.88 5.33 0051.50 Pass 4100.00 4085.17 -132536 7566.53 2947.19 4062.27 -221361 6925.74 214.81 1095.50 311.08 764.42 887.71 5.3D OSF1.50 Pass 4150.00 4085.65 -135461 7607.08 2996.65 4062.16 -2242.56 696584 214.58 1095.53 312.85 782.68 686.55 5.27 OSF1.50 Pass 4200.00 408612 -138386 7647.62 3046.65 406198 -227182 7006.38 214.54 1095.56 31463 780.94 865.40 5.24 0551.50 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1 (P3) 3/5/2015 3:03 PM Page 12 of 24 Trajectory:SPO4-SE7L1(P3)Vs.S107-SE4(P3) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU COMrollkrg Reference MD Reference TVD Reference NS Reference EW Offset MD Offset ND Offset NS Offset EW North A0m Ct-Ct Distance Separation Reference Clearance OSF Ruta State (ft) OR (ft) OR R) (ft) (6) 18) (°) (ft) (R) (R) (ft) 4250.00 4086.59 -1413.11 7198.17 3096.64 4061.80 -2301.09 7046.91 214.51 1095.60 31641 779.19 88425 5.21 OSF1.50 Pass 4300.00 4087.07 -1442.36 7728.72 3146.64 406162 2330.36 7087.45 214.47 1095.64 318.19 777.44 883.10 5.18 06F1.50 Pass 4350.00 4087.94 -1471.61 7769.27 3196.63 406145 -235962 7127.97 214.42 109568 31888 775.80 882.02 5.15 OSF1.50 Pass 4400.00 4089.69 -1560.84 7809.79 3246.59 4061.27 2398.87 7168.48 214.32 1085.75 321.51 774.25 881.01 5.13 OSF1.50 Pass 4450.00 4092.31 -153005 7850.29 3296.51 406109 -2418.09 7208.95 214.18 1095.85 323.07 772.79 880.07 5.10 OSF1.50 Pass 4500.00 4095.69 -155924 789074 3346.38 406092 244728 7249.39 213.99 109598 32465 771.33 879.14 508 OSF1.50 Pass 4550.00 4099.17 -1588.42 7931.19 3396.25 406074 -247648 7289.82 213.80 1098.13 328.38 769.76 878.14 5.05 OSF1.50 Pass 480000 4102.64 -1617.60 7971.65 3446.12 4060 56 -250567 7330.25 213.61 1096.28 328.07 768.21 877.16 5.03 OSF1.50 Pass 4850.60 410612 -164678 8012.10 3496.42 4060.40 -2535.11 7371.03 213.42 1096.45 329.78 766.67 876.19 5.00 OSF1.50 Pass 470000 4109.60 -167596 805255 3547.32 4060.84 -256489 7412.31 213.26 1096.58 331.32 765.26 875.30 498 OSF1.50 Warning 4750.00 4113.08 -1705.14 8093.00 3597.65 4062.01 -259433 7453.12 213.14 1096.69 33294 763.75 874.32 4.95 OSF1.50 Warning 4800.60 4116.55 -173432 8133.46 3647.60 4063.22 -2623.55 7493.61 213.02 1098.80 334.68 76211 873.27 493 OSF1.50 Warning 485000 411944 -176352 8173.94 3897.57 406444 -2652.77 7534.13 212.93 109688 336.45 760.43 872.17 4.90 OSF1.50 Warning 4900.00 4121.46 -179275 8214.45 3747.57 4065.66 -2682.01 7574.66 212.89 109692 33825 75867 871.01 488 OSF1.50 Warning 495000 4122.62 -182199 8254.99 3797.57 406688 -2711.25 7615.20 21289 1096.92 34008 75684 869.79 4.85 OSF1.50 Warning 5000.00 4122.93 -185124 8295.54 3847.56 4068.10 -2740.49 7655.73 21294 1096.87 34193 754.94 868.51 4.82 0SF1.50 Warning 505000 4123.04 -188049 833610 3997.55 406931 -2769.73 7696.26 213.00 1096.82 34380 75302 86721 4.80 OSF1.50 Warning 510000 4123.15 -1909.74 8376.85 3947.53 4070.53 -2796.96 7736.79 213.05 109676 345.67 751.10 885.91 4.77 OSF1.50 Warning 5150.00 412325 -193900 841720 3997.52 407175 -282820 7777.32 213.11 109671 347.54 749.17 86461 4.74 OSF1.50 Warning I 520.60 4123.36 -196825 845775 4046.72 4072.62 -2856.98 7817.22 213.1'�CI3-'.1. 349.38 747.29 86335 472 OSF1.50 Warning 5250.60 4123.47 -199750 8498.30 4096.29 4072.76 -2885.98 7857.42 213.15 351.22 74546 862.12 469 OSF1.50 blaming 530.60 4123.58 -2026.75 8538.85 4146.29 4072.80 -2915.23 7897.97 213.15 1096.68 353.06 74362 860.90 4.87 OSF1.0 Warning 535000 4123.68 -2056.60 8579.40 4196.29 4072.84 -294448 7938.52 213.15 109669 354.91 741.78 859.67 4.65 OSF1.50 Warning 540.00 4123.79 -208525 8619.95 424629 4072.88 -297373 7979.07 213.14 109669 356.76 739.94 858.45 4.62 OSF1.50 Warning 5450.60 4123.0 -211450 8660.50 4296.29 4072.92 302.98 8019.62 213.14 1096.70 358.81 738.09 857.22 480 OSF1.50 Warning 5560.00 4124.0 -2143.75 8701.05 4346.29 407296 -303224 8060.17 21314 1096.70 30.46 736.24 855.99 4.57 OSF1.50 Warning 5550.00 4124.11 -2173.00 8741.61 4396.29 407360 306149 8100.72 213.13 1096.71 362.31 734.39 854.76 4.55 OSF1.50 taming 5800.60 4124.22 -2202.25 8782.16 4446.29 407304 3090.74 8141.27 213.13 1096.71 384.17 732.54 853.52 4.53 OSF190 Waming 5650.00 412432 -2231.0 8822.71 4496.29 4073.08 3119.99 6181.82 213.13 1096.72 38603 730.69 852.29 450 OSF1.50 Warning • 5700.60 4124.43 -2280.75 8863.26 4547.07 4073.14 3149.70 8223.0 213.12 1096.72 367.88 728.84 851.05 4.48 OSF1.50 taming 575000 412454 -2290.0 8903.81 4597.88 4073.52 3179.38 826424 213.14 1096.65 399.65 727.0 849.81 446 OSF1 50 Warning 580.60 4124.64 -2319.25 8944.36 4647.88 4073.90 3208.59 830482 213.15 1096.58 371.52 725.06 848.49 4.44 OSF1 50 Wamerg 5850.60 412475 -234851 8984.91 4897.88 407428 3237.79 8345.40 213.17 1098.52 373.40 723.12 847.18 441 OSF1.50 Coming 590.0 4124.70 -2377.76 9025.46 4747.88 407467 3266.99 8385.98 213.19 109644 375.28 721.16 845.85 4.39 OSF1 50 Warning 5950.60 4123.84 -240760 9066.01 4797.86 4075.0 3296.19 8426.55 213.26 1096.33 377.19 719.14 84446 4.37 OSF1.50 Laming 600.00 4122.12 -243624 9106.53 4847.82 407544 3325.37 846709 213.37 1096.18 379.13 717.06 843.02 4.35 OSF1.50 taming 6050.0 4119.52 -246545 9147.03 4897.73 4075.82 3354.52 85070 213.53 109601 381.09 714.92 841.54 4.32 OSF1.0 Warning 610.60 411610 -2494.63 9187.48 4947.58 4076.20 3383.64 854807 213.73 109581 383.07 71273 840.02 4.30 OSF1 50 Warning 6150.00 411249 -2523.80 922793 4997.42 407658 -341276 8588.52 213.94 1095.61 385.06 710.55 838.50 4.28 OSF1.50 Warning 6200.00 4108.89 -255298 9288.37 5047.26 4076.97 -3441.87 8628.97 214.14 1095.43 387.05 70.39 837.00 425 OSF1.50 blaming 6250.00 4105.0 -2582.17 9308.84 5095.98 4077.03 347034 8668.50 21431 1095.30 388.81 706.39 835.82 4.23 OSF1.0 Warning 6360.60 4103.39 -2611.39 934935 5145.0 407626 3499.04 8708.31 214.0 390.72 704.53 834.37 421 0SF1.50 Warning 6350.60 410226 -2640.64 938988 5194.81 4074.85 3528.13 8748.64 214.37 1095.26 392.41 702.85 833.25 4.20 OSF1.50 Laming 640.60 410222 -2669.89 9430.43 524479 4073.39 -3557.36 8789.15 214.30 109529 39407 701.23 832.17 4.18 OSF1.50 blaming 6450.0 410.27 -2699.14 947097 5294.72 4071.94 -3586.56 8829.63 214.18 109536 39570 699.66 831.15 4.16 OSF1.50 Naming 6500.60 4105.26 -272837 9511.48 534490 4070.49 361573 8870.07 214.0 1095.46 39736 698.10 830.15 414 OSF1.50 Warning 6550.00 4107.36 -275760 955199 5394.48 406904 -3644.90 8910.50 213.81 109557 399.14 696.43 829.07 4.13 09F1.60 Warning 660.0 4109.47 -2788.83 9592.50 5444.35 4067.59 -3674.07 8950.93 213.63 1095.70 40.92 694.78 828.01 4.11 0SF7.0 Warning 680.00 4111.58 -281607 9633.02 5494.22 4066.14 -3703.23 8991.36 213.44 1095.84 40270 03.14 826.96 4.09 OSF1.50 Warning 670.0 411169 -2845.30 9673.53 5544.10 4064.68 -373240 9031.79 213.26 10598 404.47 691.52 825.93 4.07 OSF1.50 Warning 675000 4115.79 -2874.53 971404 5593.72 4063.28 -3761.42 9072.01 213.07 1096.15 40620 689.94 82494 4.06 OSF1.50 Wamng 600.0 4117.0 -290376 9754.55 5643.26 4062.45 -3790.45 9112.15 212.92 1096.34 407.84 688.0 824.04 4.04 OSF1.50 Waring 68500 4119.99 -293299 979506 5693.18 406174 3819.71 915280 212.77 1096.55 40.53 687.02 823.12 4.02 OSF1.50 Warring 600.0 4121.75 -296222 9835.59 5743.12 406104 3848.97 919306 21263 1098.75 411.32 68543 822.13 4.01 OSF1.50 Warning 8950.0 4123.12 -2991.46 9876.12 5793.08 400.33 3878.25 9233.53 212.52 1098.94 413.14 6830 821.11 3.99 OSF1.50 Warning 700.0 412441 -020.89 9916.67 5843.04 4059.63 307.53 9274.0 212.42 107.13 414.96 68217 82008 3.97 OSF1.50 VVaming 7050.0 4125.70 -3049.0 995721 5893.0 405892 -3936.81 931448 21231 109733 416.79 8054 819.06 3.96 OSF1.50 Warning 710.0 4127.60 -3079.16 9997.75 5942.96 4058.22 -3966.09 8354.95 212.21 1097.52 418.61 678.92 81804 3.94 OSF7.0 Warning 710.0 4128.29 -3108.40 1038.29 599292 4057.51 -399537 9395.43 - 212.10 1097.73 420.43 677.30 817.03 3.92 OSF1.50 Nhming 7200.0 4129.58 -313763 1607883 042.88 4056.81 -4024.65 9435.0 21200 1087.93 422.25 675.68 816.02 3.91 OSF1.0 Warning 7250.0 4130.88 -3188.87 10119.38 6092.84 4056.10 -4053.93 9476.38 211.90 1098.14 42407 674.07 815.02 3.89 OSF1.50 Warning 730.0 413217 -3196.10 1015992 6128.61 405560 -4074.89 9505.36 211.82 109844 425.541 672.971 81131 ' OSF7.0 taming 7350.0 4133.46 -3225.34 102046 6129.61 4055.60 -4074.89 950536 211.82 110044 42557 67481 8183£ 7377.37 413417 -324134 1022285 6128.81 4055.60 -4074.89 9505.38 211.82 110249 425.24 67726 818.59 3.0 OSF1.0 Warning End o1 molts • • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 13 of 24 Field: Mkedcluq Well: 5102-SE6 Structure: Spy Island Borehole( 5102-SE6 Slot: SP02 Trajectory: 0102-SE6(P3) Client: Eni Petroleum Type: Del Plan Coordinate System: 10027 Alaska Stele Plane.Zone 04 US Feet North Reference: True Grid Convergence Angle: 0.09073112° Grid Scale Factor: 0999900156 Magnetic Declination: 20.204° Magnetic Declination Date: December 15.2012 Magnetic Model: BGGM 2011 Reference Point: Northing 5ggBnc 5jfvation Structure Unc. Io Unc. 6053669 530(ftLIS) 511731 060(SUS) 54 100(ft)MSL 0.000(ft)(1 6gma) 0.000(ft)(1 sigma) Trajectory Error Model:ISCWSAO 3-0 95.000%Confidence 2.7955 sigma Surveulna Prow While Drilling Description Part MD From Qq MD To(ft)EOU Fran(f1) Burvay Tool Type Hole RIO.(In) Casing Diameter(In) Borehole/Survey 1 0.000 1.000 1/100.000 SLB NSG+MSHOT-Depth Only-No Global 16.000 13.375 S102SE6/S102-SE6(P3) 1 41.000 1000.000 1/100.000 SLB NSG+MSHOT-No Global 16.000 13.375 0102SE8/5102-SE6(P3) 2 500.000 2717.528 1/100,000 SLB MWD+GMAG-No Global 16.000 13.375 S102SE8/S102SE6(P3) 2 2717.528 8359.317 1/100.000 SLB_MWD+GMAG-No Global 12.250 9.825 0102-SE6/S102SE6(P3) 2 8359.317 18335.286 1/1170.000 SLB_MWD+GMAG-No Global 8.750 5500 01025E8/SI02-SE6(P3) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference NO Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (5) (ft) (8) (9) _ (6) (8) (9) (ft) (°) (0) (8) (ft) (ft) Al local minima indicated. Results filtered.Depth 7100.00 ft oc MD<=17377.37 ft Results tittered'.Ct-Ct separation<=1500.00 ft Results highlighted:Ct-Ct separation<=1320.005 7100.00 405527 2792.55 1911.91 7809.28 402553 3853.46 252683 29.53 1226.60 117.28 1109.32 1148.00 15.84 OSF1.50 Pass 7150.00 405755 276843 195565 7859.26 402902 3828.53 2570.00 30.571225.$8 118.23 1107.35 1146.35 1570 OSF1 50 Pass ]200.00 4060.62 2743.75 1999.02 7909.25 403251 360360 261319 31.69 1225.716 119.30 1105y�66 11453 15.55 OSF1.50 Pass 7250.00 4063.58 271777 2041 64 7959.23 4035.99 3778.67 2656.37 33.50 1226.44 121.94 1104.41 114471' 15.22 OSF1 50 Pass 7300.00 406608 2690.36 208337 8009.14 403948 3753.77 2699.48 35.31 122929 12467 1104.62 114577 14.92 OSF1 50 Pass 7350.00 406810 266154 2124.18 8058.91 404295 3728.95 274248 37.14 1233.81 132.42 1101.34 1145.10 14.09 OSF1.50 Pass 06 7400.00 49.65 2631 36 2164 01 8108.48 4046.41 3704.23 2785 31 38.99 123999 140.45 1 .54 1145 gF 13.35 OSF1.50 Pass 7450.00 4070.73 2599.85 2202.82 8157 79 4049 85 3679 63 2827 91 40.84 1247.84 150. 1146.90 1250 OSF1.50 Pass 7500.00 407133 256705 224055 820679 4053.26 3655.19 2870.24 4272 1257.33 158. 11511 OSF1 50 Pass 7550.00 407146 2533.00 2277.16 825541 4056.65 3630.94 2912.24 44.61 126847 159.42 1109.05 116178 120 OSF1.50 Pass 7600.00 407111 249774 2312.60 8303.60 406002 360690 295387 4652 1281.25 160.19 1121.06 117405 12.08 OSF1.50 Pass 7650.00 407044 246192 234748 8351.55 4063.36 3582.99 2995.29 4545 129480 16107 1133.74 118702 12.14 OSF1.50 Pass 7700.00 4069.83 2427.23 238348 8399.91 406673 3558.87 303708 43.22 130683 161.97 1144.86 1198.44 1218 OSF1.50 Pass 7750.00 406931 239382 242067 847782 407165 3519.28 310399 40.92 1316.65 16365 1153.00 1207.14 1215 OSF1.50 Pass 7800.00 4068.88 2361.73 2459.01 8558.99 407558 3476.36 317278 38.69 1323.60 165.32 1158.28 1212.98 1209 OSF1.50 Pass 7850.00 4068.53 2330.99 2498.44 8641.05 4078.31 3431.29 3241.29 3653 1327.62 16709 1160.53 1215.82 11.99 OSF1.50 Pass 7900.00 4068.16 2301.51 2538.82 8723.53 407979 3384.30 3309.06 35.31 1328.86 168.86 1159.99 1215.87 11.88 OSF1.50 Pass 7950.00 4067.66 2272.25 2579.36 878559 408016 3347.98 335939 35.27 1328.83 170.46 1158.38 121478 11.77 OSF1.50 Pass 800000 4067.16 224300 2619.91 8835.59 408039 3318.63 339986 35.24 132871 171.95 1156.77 121368 11.66 OSF1.50 Pass 8050.60 4066.67 221375 2860.45 8885.58 408062 3289.28 344033 35.21 1328.60 173.80 115501 1212.48 11.55 OSF1.50 Pass 810000 4066.17 2184.49 2701.00 8935.57 4050.84 3259.93 3480.80 35.18 132849 175.25 1153.24 121125 11.44 OSF1.50 Pass 815000 4065.68 2155.24 2741.55 898557 4081.07 3230.58 3521.27 35.15 132838 177.05 115132 1209.93 11.32 OSF1.50 Pass 820000 4065.18 212598 2782.09 9035.56 4081.30 3201.23 3561.75 35.11 132826 178.86 1149.41 1206.62 11.21 OSF1.50 Pass 825000 406468 2096.73 282264 9085.56 408153 3171.89 3602.22 35.08 1328.15 180.80 1147.36 1207.21 11.06 OSF1.50 Pass 830000 406419 2067.48 2863.18 9135.55 408176 3142.54 3642.69 35.05 1328.04 182.74 1145.30 1205.81 10.96 OSF1.50 Pass 8350.00 4063.70 203822 290373 918555 4081.98 3113.19 3683.16 3202 1327.93 184.78 1143.15 1204.34 10.84 OSF1.50 Pass 8400.00 406172 20897 2944.28 9235.55 4082.21 3083.83 3723.64 35.01 1327,81 18863 114098 1202.85 10.72 OSF1.50 Pass 845000 4064.62 197972 298482 9285.54 4082.44 305448 3784.11 35.04 1327.68 188.96 1138.72 1201.30 10.60 OSF1.50 Pass 850000 406629 1950.49 302535 933552 408267 3025.14 3804.57 3210 132753 191.14 113640 1199.70 10.48 OSF1.50 Pass 855000 4068.09 192125 306587 9385.50 4082.90 2995.81 3845.03 35.17 1327.39 193.46 113393 1198.01 10.35 OSF1.50 Pass 860000 4069.88 189202 3106.40 943547 4083.13 2966.47 3885.49 8.24 132725 195.79 113146 1186.31 10.22 OSF1.50 Pass 8650.00 4071.67 186279 3146.92 948545 4083.35 2937.13 392594 8.31 1327.11 198.22 112889 119455 10.10 OSF1.50 Pass 8700.00 407346 183355 3187.45 958.42 4083.58 290779 3966.40 3537 1328.97 20066 1126.31 1192.79 997 00F1.50 Pass 875000 4075.26 180432 3227.97 9585.40 4083.81 2878.45 4006.88 35.44 132684 203.19 112364 1190.97 8.85 OSF1.50 Pass 8800.00 4077.05 1775.09 3268.50 963537 4084.04 284911 4047.31 3551 132870 205.73 112098 1189.14 9.'72 OSF1.50 Pass 8950008850.00 4078.84 174526 330902 35 408427 1978 4087.77 3258 132627 208.34 t.60 OSF1.50 Pass 5 11118.7 I Pass 408900.03 81.35 1687.38 3390.1.49 171962 50 978.5.32 4084.72 2778.09 188.0 35.85 132630 210.94.44 412813 35.63 1326.44 88 114.63 1200.11 15.6 OSF1.50 Pass 9000.00 4081.72 1658.14 3430.65 983532 4084.95 2731.73 4209.18 35.66 1326.17 189.90 113627 1199.16 10.53 OSF1.50 Pass 9050.00 4082.10 162889 3471.21 9885.32 4085.18 2702.38 4249.65 35.66 1328.03 191.15 1134.88 1198.19 10.46 OSF1.50 Pass 9100.00 4082.48 1599.65 3511.76 993532 4085.41 2673.03 4290.13 35.67 1325.90 192.41 1133.49 1197.22 10.39 OSF1.50 Pass 9150.00 4082.85 1570.41 3552.31 9985.32 4085.64 2843.68 4330.61 35.68 1325.77 193.69 1132.07 1196.23 10.32 OSF1.50 Pass 9200.00 408323 1541.18 3592.87 0035.32 4085.86 261432 4371.08 3568 1325.63 19498 1130.8 1195.24 1025 OSF1.50 Pass 9250.00 4083.60 1511.92 3833.42 0085.32 4086.09 258497 4411.56 3569 1325.50 198.28 1129.21 1194.23 10.18 OSF1.50 Pass 9300.00 4093.98 1482.67 873.98 018.32 4086.32 2555.62 4452.04 35.70 1325.36 197.60 1127.77 1193.23 10.11 OSF1.50 Pass 9350.00 4084.36 1453.43 371453 0185.32 408655 252627 4492.51 35.70 1325/3 198.92 1126.31 1192.21 10.05 OSF1.50 Pass 9400.00 408497 1424.18 3755.08 023532 408678 2496.91 4532.99 3574 1325.10 270.22 1124.89 1191.22 9.98 OSF1.50 Pass 9450.00 4085.75 1394.93 3795.82 028.31 408700 246756 4573.46 3576 132498 271.58 1123.40 1190.19 9.81 OSF1.50 Pass 9500.00 4086.53 13868 3836.16 0335.31 4087.23 2438.21 481194 8.78 132486 202.94 1121.92 1189.16 9.84 OSF1.50 Pass 9550.00 4087.31 133642 876.71 038.31 408746 2408.8 4654.41 8.81 132475 20433 112042 1188.12 2.77 OSF1.50 Pass 9600.00 4088.08 1307.17 817.25 048.8 4087.8 237951 484.89 8.83 1324.63 205.72 1118.91 118707 9.71 OSF1.50 Pass 965000 408.8 1277.92 3957.78 0485.30 408792 280.16 4735.36 35.86 132451 207.13 1117.38 1186.02 9.64 OSF1.50 Pass 9700.00 4089.64 124886 3998.33 88.8 4088.15 2327.81 4775.83 3588 132439 278.54 1115.85 1184.96 9.57 OSF1.50 Pass 9750.00 409042 121841 403887 0585.30 4088.37 2291.46 4816.31 35.90 132427 279.87 1114.30 1183.88 9.51 OSF1.50 Pass 980000 4091.19 1190.18 4078.42 063229 4088.60 2262.11 4856.78 3593 1324.15 211.40 1112.75 1182.81 9.44 OSF1.50 Pass 9850.00 409190 116090 4118.96 0885.29 4088.83 2232.78 4897.26 8.95 132404 212.8 1111.19 1181.73 9.8 OSF1.50 Pass 9900.00 4091.88 1131.65 4180.51 072529 408906 2273.40 4937.73 35.93 1323.91 214.29 1109.82 1180.65 9.31 OSF1.50 Pass 9950.00 4091.11 1102.40 4201.05 078.28 4089.29 2174.06 4978.20 35.88 1323.79 215.73 1108.08 1179.58 9.25 OSF1.50 Pass 10000.00 4090.23 1073.15 4241.80 0835.27 4089.52 2144.71 5018.67 3583 1323.66 217.18 1106.48 1178.47 9.19 OSF1.50 Pass 10050.00 4089.35 1043.91 4282.14 0885.25 408974 2115.37 5059.13 8.79 1323.54 218.84 1104.90 1177.37 9.12 OSF1.50 Pass 10100.00 4088.47 101486 4322.68 093524 4089.97 208.02 5099.60 35.74 1323.41 220.10 1103.31 1176.27 9.06 OSF1.50 Pass 10150.00 4087.60 985.41 483.23 0985.23 409020 2058.88 514007 35.69 1323.29 221.58 1101.70 1175.16 9.00 OSF1.50 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 14 of 24 Trajectory:SP04-SE7L1(P3)Vs.S102-566(P3) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW NorIP Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (5) (ft) (ft) 0) (ft) (ft) (ft) (') CO (ft) (ft) (ft) 0200.00 4086.72 956.17 4403.77 103522 4090.43 2027.33 5180.53 3564 1323.16 223.06 1100.10 174.05 8.94 05F1.50 Pass 025000 4085.84 926.92 4444.32 1085.20 409066 199798 5221.00 3559 132304 22456 108848 172.93 8.88 OSF1.50 Pass 0300.00 408496 897.67 4484.86 1135.19 409088 1968.64 526147 35.55 1322.92 22606 109686 171.81 8.82 OSF1.50 Pass 080.00 408420 86842 452541 118518 409111 193929 5301.94 35.50 1322.80 22754 1095.28 170.70 8.76 OSF1.50 Pass 0400.00 4084.19 839.17 4565.96 1235.18 4091.34 1909.94 5342.41 35.50 1322.68 229.01 109367 169.40 8.70 OSF1.50 Pass 0450.00 4084.44 809.92 4606.51 128518 409157 1880.59 538289 35.50 1322.55 230.56 1091.99 168.44 8.64 OSF1.50 Pass 0500.00 4084.69 780.67 4647.06 1335.18 409180 185124 5423.38 35.50 1322.43 232.11 109032 167.28 8.58 0571.50 Pass 0550.00 4084.95 75142 468761 138518 409203 1821.88 546384 8.50 132230 233.67 108863 168.11 8.52 OSF1.50 Pass 0600.00 4085.20 722.17 4728.16 1435.18 4092.25 179253 5504.32 35.50 1322.18 235.24 108694 184.94 8.47 OSF1.50 Pass 0650.00 408545 69291 4768.71 148518 409248 1763.18 554479 35.50 1322.05 236.82 1085.24 163.77 8.41 OSF1.50 Pass 0700.00 4085.70 863.66 4809.26 153518 409271 1733.82 5585.27 35.50 1321.93 238.40 108353 182.59 835 OSF1.50 Pass 075000 408595 634,41 4849.81 1585.18 409294 1704.47 562575 35.50 1321.80 239.99 1081.81 161.40 830 OSF1.50 Pass 0800.00 4086.20 605.16 4890.38 1835.18 4093.17 1675.12 5866.22 35.50 1321.88 241.59 1060.69 180.21 8.24 OSF1.50 Pass 0850.00 408645 575.91 4930.91 1685.18 4093.39 1645.77 5706.70 35.50 1321.55 243.19 1078.36 159.02 8.18 OSF1.50 Pass 0900.00 408644 54656 4971.46 173518 409362 1816.41 5747.18 35.49 1321.43 244.80 1076.63 157.82 8.13 OSF1.50 Pass 0950.00 4086.10 517.41 5012.01 1785.17 409385 1587.06 5787.65 8.47 1321.30 248.40 1074.90 156.63 8.08 OSF1.50 Pass 1000.00 408572 48816 5052.58 1835.17 4094.08 1557.71 582812 35.44 1321.18 248.02 1073.16 155.43 8.02 OSF1.50 Pass 1050.00 408535 45891 5093.11 1885.17 409431 1528.36 5868.60 35.41 1321.06 249.64 107142 154.22 7.97 OSF1.50 Pass 1100.00 4084.98 429.66 5133.86 193516 409454 1499.01 5909.07 35.39 1320.93 251.26 1069.67 153.02 7.92 OSF1.50 Pass 1150.00 4084.61 400.41 5174.21 198516 409476 1469.66 5949.55 35.36 1320.81 252.89 1067.92 151.81 7.87 OSF1.50 Pass 1200.00 4084.24 37116 5214.76 203516 4094.99 1440.31 5990.02 35.34 1320.69 254.53 1066.16 150.59 7.81 OSF1.50 Pass 1250.00 4083.87 34192 525531 208515 409522 1410.96 603049 35.31 1320.57 258.17 106439 14938 776 OSF1.50 Pass 1300.00 4083.49 31267 5295.86 2135.15 409545 1381.61 6070.97 35.28 1320.44 257.82 1052.62 148.18 7.71 OSF1.50 Pass 1350.00 4083.15 283.42 5336.41 218514 409568 1352.26 6111.44 35.26 1320.32 259.45 1060.87 148.95 7.66 OSF1.50 Pass 1400.00 4083.16 254.17 5376.96 2235.14 409591 1322.91 6151.92 35.25 1320.20 261.02 1059.18 145.78 7.62 OSF1.50 Pass 1450.00 4083.60 22492 5417.51 2285.14 4096.13 1293.55 6192.39 35.26 1320.07 262.58 1057.49 144.61 7.57 OSF1.50 Pass 1500.00 4084.30 19567 545806 2335.14 4096.36 126420 8232.87 3528 1319.94 264.20 1055.74 143.40 752 OSF1.50 Pass 1550.00 408500 166.42 5498.61 2385.14 4096.59 1234.85 6273.34 3530 1319.81 28589 1053.92 14214 7.47 OSF1.50 Pass 1600.00 4085.70 137.17 5539.15 243514 409682 1205.50 6313.82 3532 1319.66 267.59 1052.09 140.88 7.42 OSF1.50 Pass 1650.00 4086.40 107.92 557970 2485.13 409705 1176.15 8354.29 3535 1319.55 28930 1050.26 13961 738 OSF1.50 Pass 1700.00 4087.10 78.87 5620.24 2535.13 4197.27 1146.80 6394.77 3537 1319.42 271.00 1048.42 138.35 7.33 OSF1.50 Pass 1750.00 4087.80 49.42 5660.79 258513 409750 1117.45 6435.24 3039 131930 27272 1046.58 13708 7.28 OSF1.50 Pass 1800.00 4088.50 20.17 570134 2635.13 409773 1088.10 8475.72 3541 1319.17 274.44 1044.73 13580 724 OSF1.50 Pass 1860.00 4089.18 -8.06 574188 2685.12 4097.96 105874 6516.19 3543 1319.04 276.16 104288 134.53 7.19 OSF1.50 Pass 1900.00 4089.52 -38.33 578243 2735.12 4098.19 1029.39 6558.67 35.43 131891 277.88 1041.03 133.25 7.14 OSF1.50 Pass 1950.00 4089.56 -6758 582298 278512 409842 1000.04 6597.14 3542 1318.79 279.60 1039.19 131.98 7.10 OSF1.50 Pass 2000.00 4089.59 -96.83 5963.53 2835.12 4098.64 970.69 8637.62 35.41 131967 281.32 1037.34 130.71 706 OSF1.50 Pm 2050.00 4089.62 -126.08 5904.09 2885.12 4098.87 941.33 6678.10 3540 1318.54 28305 1035.49 129.43 7.01 0571.50 Pass 2100.00 4089.65 -155.33 5944.64 293512 4099.10 911.98 6718.57 35.39 131842 28479 1033.63 128.15 6.97 OSF1.50 Pass 2150.00 4089.88 -18458 5985.19 2985.12 4099.33 88263 8758.05 3539 1318.30 286.52 1031.77 128.87 6.92 0571.50 Pass 2200.00 4089.71 -21384 6025.74 3035.12 4099.56 853.28 8799.53 3538 1318.17 288.26 1029.91 12559 6.88 OSF150 Pass 2250.00 4059.74 -24309 6066.29 3085.12 4099.79 823.92 6840.00 35.37 1318.05 290.01 1028.04 124.30 6.84 05F150 Pass 2300.00 9089.77 -27234 6106.84 313512 4100.01 794.57 6880.48 35.36 1317.92 291.76 1026.17 123.01 6.80 OSF1.50 Pass 2350.00 408184 -30159 6147.39 3185.12 4100.24 785.22 6920.95 35.36 1317.80 293.48 102432 12174 6.76 057150 Pass 2400.00 4090.27 -330.84 6187.93 323512 4100,47 735.87 696143 3537 1317.68 295.15 1022.53 120.50 6.72 05F1.50 Pass 2450.00 4090.87 -360.10 6228.48 3285.12 4100.70 706.52 7001.91 35.39 1317.58 296.92 102063 119.20 6.68 05F1.50 Pass 2500.00 4091.46 -38935 6269.02 3335.11 410093 677.16 704238 3540 1317.43 298.70 1018.74 117.90 6.64 OSF1.50 Pass 2550.00 4092.05 -418.61 6309.57 3385.11 4101.15 647.81 7082.88 3542 1317.31 300.48 1016.84 118.59 6.60 057150 Pass 2600.60 4092.65 -447.86 6350.11 343511 4101.38 618.46 7123.33 35.43 1317.19 302.26 101493 11528 6.56 05F1.50 Pass 2850.00 4093.24 -477.12 6390.65 3485.11 4101.61 589.11 7163.81 3545 1317.07 304.05 101302 113.97 6.52 05F1.50 Pass 270000 4093.83 -506.37 643120 3535.11 410184 559.76 7204.28 35.47 1318.95 305.83 1011.12 112.65 6.48 0571.50 Pass 2750.00 409442 535.63 647174 3585.11 4102.07 530.40 724476 35.48 131883 307.63 1009.20 111.34 6.44 0571.50 Pass 2800.00 4095.02 564.88 651229 3635.11 4102.30 501.05 7285.23 35.50 1316.71 309.42 1007.28 110.02 640 0571.50 Pass 2860.00 4095.59 594.14 655283 3685.10 410252 47170 7325.71 8.51 1316.59 31122 1005.36 108.70 6.36 0571.50 Pass 2900.00 4095.59 523.39 6593.38 3735.10 4102.75 44235 7366.19 35.48 1318.48 313.01 1003.45 107.38 6.33 0571.50 Pass 2950.60 4094.85 -65263 663383 3785.09 4102.88 413.00 7406.65 3544 1318.33 31479 1001.54 10606 629 OSF1.50 Pass 3000.00 4094.02 -68187 687448 3835.08 4103.21 383.66 7447.12 35.39 1316.21 316.57 999.64 104.75 6.25 OSF1.50 Pass 3050.00 4093.20 -711.11 671503 3885.07 4103.44 354.31 7487.59 8.35 1318.08 318.35 99773 103.44 622 0571.50 Pass 3100.00 4092.37 -740.35 675558 3935.06 4103.66 32496 7528.06 35.30 1315.98 32014 995.82 102.12 8.18 OSF1.50 Pass 3150.00 4091.55 -769.59 679613 398505 4103.89 295.62 7566.53 35.26 1315.83 321.92 993.91 100.81 615 OSF1.50 Pass 3200.00 409073 -798.83 683668 4035.04 410412 266.27 7608.99 35.21 1315.71 323.71 992.00 099.49 8.11 0571.50 Pass 3250.00 4089.90 -82807 687723 4085.03 410435 236.93 7649.46 35.16 1315.59 325.51 990.08 098.17 8.08 OSF1.50 Pass 3300.00 4089.08 -857.31 601778 4135.01 4104.58 20758 7689.93 35.12 131547 32730 988.17 098.86 6.05 OSF1.50 Pass 3350.00 4088.25 -88656 6958.33 4185.00 410481 17823 7730.40 35.07 1315.35 329.10 986.25 095.54 6.01 OSF1.50 Pass 3400.00 408764 -91580 608888 4235.00 4105.03 14888 7770.87 35.05 1315.23 330.80 884.43 094.29 5.96 0571.50 Pass 345100 408715 -94506 7039.42 4284.99 4105.26 11953 7611.34 35.02 1315.12 33261 982.51 692.97 595 057150 Pass 3500.00 4086.67 -974.31 7079.97 4334.99 4105.49 90.19 7851.81 34.99 131501 33443 860.59 091.65 5.91 OSF1.50 Pass 3550.00 4086.18 -1003.57 7120.51 438498 4105.72 60.84 7602.28 34.96 1314.90 33624 97866 690.33 5.88 05F150 Pass 360000 4085.70 -103282 7181.06 4434.98 4105.95 31.49 7932.76 34.93 131479 338.06 976.74 089.02 585 05F150 Pass 3650.00 408521 -1082.06 720180 4484.97 4106.17 214 797323 3490 131489 369.86 97481 067.69 582 OSF1.50 Pass 3700.00 4084.73 -109134 724215 453496 4106.40 -2721 801370 3487 1314.58 341.70 97288 088.37 579 0591.50 Pass 3750.00 408424 -1120.59 7282.69 458496 4108.83 -5656 805417 34.84 131447 343.52 97095 085.05 575 OSP).50 Pass 3800.00 4083.75 -1149,85 7323.24 483495 4106.66 -8591 8094.65 34.80 1314.37 345.35 98902 083.73 572 OSF1.50 Pass 3860.00 4083.35 -1179.10 7363.78 4684.95 4107.69 -115.26 8135.12 34.78 1314.26 347.13 967.13 082.43 5.89 OSF1.50 Pass 3900.00 4083.36 -1208.38 7404.33 473495 4107.32 -144.82 8175.60 34.76 1314.14 348.85 965.29 081.16 5.67 0071.50 Pass 3950.00 4083.76 -1237.81 7444.88 4784.95 4107.54 -173.97 8216.07 34.77 1314.01 350.58 983.43 079.88 564 OSF1.50 Pass 4000.00 408423 -1266.88 7485.43 483495 410777 -203.32 8258.55 34.78 1313.88 352.36 961.52 078.57 5.61 OSF1.50 Pass 4050.00 4084.70 -1296.11 7525.98 4884.95 4108.00 -232.67 8297.02 34.79 1313.75 384.22 95953 07720 558 OSF1.50 Pass 4100.00 4085.17 -1325.36 7566.53 4934.95 410823 -262.02 833750 3480 131362 358.09 95754 07583 5.55 OSF1.50 Pass 4150.00 408565 -135461 760708 4964.95 410846 -291.38 8377.98 34.81 131349 357.95 95554 074.45 5.52 OSF1.50 Pass 4270.00 4066.12 -1383.86 7647.62 5034.94 4108.69 -320.73 8418.45 34.82 1313.37 89.82 953.55 073.08 5.49 OSF1.50 Pass 4250.00 408659 -1413.11 7688.17 508494 410891 -350.06 8458.93 34.83 1313.24 8189 951.55 071.70 5.46 05F1.50 Pass 4300.00 4087.07 -144236 7728.72 5134.94 4109.14 -37/43 8499.40 34.84 1313.11 363.55 949.55 070.33 5.43 0571.50 Pass 4350.00 4087.94 -1471.61 776927 5184.94 4109.37 -408.78 8539.88 3487 131297 365.8 947.61 068.99 5.40 0571.60 Pass 4400.00 4089.69 -150054 7809.79 5234.91 4109.60 -438.12 8560.33 34.94 131282 357.15 945.68 067.60 538 007150 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 15 of 24 Trajectory:6PO4-SE7L7(P3)Vs.S102-SE6(P3) Minimum Albwable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TOD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Stabs (0) (ft) (ft) (ft) ft) (ft) (ft) () 7) • (ft) • (ft) (ft) (ft) 4450.00 409231 -1530.05 7850.29 5284.86 4108.83 -467.44 620.76 35.05 131266 36892 94175 1068.31 5.35 OSF1.00 Pass 4500.00 4095.69 -155924 7890.74 5334.76 4110.05 -496.74 661.16 35.19 131250 37074 941.76 1064.93 5.32 OSF1.50 Pass 4550.00 4099.17 -1588.42 7931.19 5384.65 4110.28 -526.03 701.55 35.33 131234 372.69 939.65 1063.48 5.29 OSF1.50 Pass 4600.00 4102.64 -161760 7971.65 5434.54 4110.51 -555.32 741.94 35.47 1312.20 374.83 937.56 1062.03 5.27 OSF1.50 Pass 4650.00 4106.12 -1846.78 8012.10 548444 4110.74 -584.61 782.33 35.81 1312.08 376.58 935.47 1060.59 5.24 OSF1.50 Pass 4700.00 4109.60 -1675.96 8052.55 5534.33 4110.96 -613.80 882272 35.76 1311.92 378.53 933.40 1059.16 5.21 00F1.50 Pass 475000 4113.08 -1705.14 8093.00 5584.23 4111.19 -643.19 8863.12 35.90 1311.80 390.47 931.33 1057.74 5.18 OSF1.50 Pass 480000 4116.55 -1734.32 813346 5634.12 4111.42 -67248 8903.51 36.04 131168 382.42 929.28 1056.33 5.18 00F1.50 Pass 4850.00 4119.44 -1783.52 8173.94 5684.05 4111.65 -701.79 8943.93 38.15 1311.57 384.36 92721 1054.93 513 00F1.50 Pass 490000 4121.46 -1792.75 821445 5734.02 4111.88 -731.12 898438 38.23 1311.48 386.28 925.18 1053.53 5.10 OSF1.50 Pass 4950.00 412262 -1821.99 8254.99 5784.01 411210 -780.47 902484 38.27 131134 38819 923.15 1052.14 508 OSF1.50 Pass 5000.00 4122.93 -1851.24 829554 5834.01 411233 -789.82 9065.32 36.27 131121 390.08 921.14 1050.75 5.05 OSF1.50 Pass 505000 412304 -1880.49 8336.10 5884.01 4112.58 -819.17 9105.80 38.28 1311.09 391.97 919.12 1049.37 503 OSF1.50 Pens 5100.00 4123.15 -1909.74 8376.65 593401 4112.79 -848.53 9148.27 36.26 1310.98 39386 917.10 1047.98 5.00 OSF1.50 Pass 5150.00 4123.25 -193800 841720 598401 4113.02 -877.88 9188.75 36.25 1310.83 395.75 915.08 1046.59 4.98 OSF1.50 Wammg 5200.00 4123.36 -196825 8457.75 603401 4113.25 -90723 9227.23 36.25 1310.71 397.65 913.176 1045.20 495 OSF1.50 Weming 5250.00 412347 -1997.50 8498.30 6084.01 4113.47 -938.58 9267.70 38.24 1310.58 39954 911.04 1043.81 4.93 OSF1.50 Warning 5300.00 4123.58 -2028.75 8538.85 6134.01 4113.70 -96594 930818 36.24 1310.45 401.44 90901 1042.42 4.91 OSF1.50 Warning 535000 4123.68 -2056.00 8579.40 6184.00 4113.93 -995.29 9348.66 36.23 1310.32 403.34 908.98 1041.02 4.88 OSF1.50 Warning 5400.00 4123.79 -2085.25 8619.95 6234.00 411416 -102464 8389.13 36.23 1310.20 405.24 90496 103963 4.86 OSF1.50 Warning 5450.00 4123.90 -211450 8660.50 6284.00 4114.39 -1054.00 9429.61 38.22 1310.07 407.14 90293 1038.23 4.84 OSF1.50 Warning 5500.00 4124.00 -214375 8701.05 6334.00 4114.61 -1083.35 947009 36.22 1309.94 408.05 900.90 1036.84 4.81 00F1.50 Warning 5550.00 412411 -217300 8741.61 6384.00 4114.84 -111270 951056 36.21 1309.82 410.95 898.86 1035.44 479 OSF1.50 Warning 5800.00 4124.22 -220225 878216 6434.00 4115.07 -1142.05 9551.04 36.20 1309.69 412.86 896.83 103404 477 OSF1.50 Warning 5650.00 4124.32 -2231.50 8822.71 6484.00 4115.30 -1171.41 9591.52 36.20 130956 41477 89480 1032.64 4.75 OSF1.50 Warning 5700.00 4124.43 -2260.75 8863.26 6534.00 411553 -1200.76 9631.99 36.19 1309.43 416.87 892.76 1031.24 4.72 OSF1.50 Warning • 5750.00 4124.54 -2290.00 8903.81 6584.00 411576 -1230.11 967247 36.19 1309.31 418.59 89072 1029.84 470 OSF1.50 Warning 5800.00 4124.64 -231925 8944.36 6634.00 4115.98 -125946 9712.94 3618 1309.18 420.50 888.68 102844 4.88 OSF1.50 Warning 5850.00 4124.75 -2348.51 898191 668400 411621 -1288.82 9753.42 36.18 1309.05 42241 886.64 102704 4.66 OSF1.50 Warning 5900.00 4124.70 -2377.76 9025.46 6734.00 4116.44 -1318.17 9793.90 36.17 1308.93 42432 884.60 102564 464 OSF1.50 Warning 5950.00 4123.84 -240700 906601 6783.99 4118.67 -1347.51 983436 36.12 130879 426.22 882.58 102424 4.62 0071.50 Warning 6000.00 4122.12 -243624 910653 6833.95 411690 -1376.84 9874.81 38.03 1308.66 428.09 880.57 1022.86 4.59 OSF1.50 Warning 6050.00 411952 -246545 914703 6883.87 4117.12 -1406.15 991522 35.80 1308.53 429.94 878.58 102149 457 OSF1.50 Warning 6100.00 4116.10 -2494.63 9187.48 6933.73 4117.35 -1435.42 9955.59 35.74 1308.40 43177 876.63 1020.14 4.55 OSF1.50 Warning 6150.00 4112.49 -252380 9227.93 6983.59 411758 -1464.69 9995.95 35.57 1308.28 43360 874.69 1018.81 4.53 OSF1.50 Warning 6200.00 4108.89 -2552.98 926837 7033.44 4117.81 -1493.95 10036.30 3540 1308.18 43542 87278 101749 4.52 OSF1.50 Warning 6250.00 4105.60 -258217 930884 7083.32 4118.04 -1523.23 10076.68 35.25 1308.08 437.18 870.90 1018.22 450 OSF1.50 Warning 6300.00 4103.39 461139 934935 7133.25 4118.26 -155255 10117.11 35.15 1307.98 43895 869.03 101494 4.48 OSF1.50 Warning 6350.00 4102.26 -2640.64 9389.88 7183.23 4118.49 -1581.89 10157.57 35.10 1307.88 44067 86720 101369 448 0571.50 Warning 6400.00 4102.22 -2669.89 943043 7233.23 4118.72 -1611.24 10198.04 35.09 1307.76 44242 865.34 101240 4.44 OSF1.50 Warning 8450.00 4103.27 -269914 947097 7283.23 411895 -1640.59 10238.51 35.13 1307.63 44421 863.42 101108 4.42 0571.50 Warning 6500.00 4105.28 -272837 9511.48 7333.19 4119.18 -1689.93 10278.96 35.21 1307.49 448.06 861.43 1008.71 440 00F1.50 Weming 6560.00 4107.38 -275760 9551.99 7383.16 411940 -1699.26 10319.41 35.29 1307.35 448.04 859.31 1008.25 4.38 OSF1.50 Warning 8600.00 4109.47 -278683 959250 743312 411963 -1728.59 10359.86 35.37 1307.22 450.02 857.20 1006.80 4.37 OSF1.50 Warning 6850.00 4111.58 -2816.07 9633.02 748309 411986 -1757.92 10400.31 3546 1307.09 451.99 855.09 1005.35 4.35 00F1.50 Warning 6700.00 4113.69 -284530 9673.53 7533.05 4120.09 -178725 10440.76 35.54 1306.96 453.97 85298 1003.90 4.33 05F1.50 Warning 6750.00 411579 -287453 9714.04 7583.02 412032 -1816.59 10481.20 35.62 1306.83 455.95 850.88 100245 4.31 0571.50 Warning 6800.00 4117.90 -290376 9754.55 763298 4120.54 -1845.92 10521.65 35.70 1306.71 457.83 848.77 1001.01 4.29 OSF1.50 Warning 6850.10 411999 -293299 9795.06 768295 412077 -1875.25 10562.10 35.78 1306.59 45991 846.67 999.57 4.27 OSF1.50 Warning 8900.00 4121.75 -2962.22 9835.59 773292 412100 -1904.59 1060256 35.84 1306.46 461.89 844.57 99812 425 OSF1.50 Warning 6950.00 4123.12 -299146 9876.12 778291 412123 -193393 10643.02 35.88 1306.33 463.85 84247 99668 4.23 OSF1.50 Warning 7000.00 4124.41 -3020.69 9916.67 7832.90 4121.46 -1983.28 10683.49 35.93 1306.20 465.82 84538 995.24 4.21 00F1.50 Warning 705000 4125.70 -304993 995721 788289 412169 -199263 10723.96 35.98 1306.07 467.78 838.28 993.80 4.20 05F1.50 Warning 7100.00 4127.00 -3079.16 9997.75 793287 4121.91 -2021.97 1076443 36.02 1305.94 469.75 836.19 99236 4.18 05F1.50 Warning 715000 4128.29 -3108.40 10038.29 798286 4122.14 -2051.32 10804.69 36.07 130581 47172 834.09 99092 4.16 OSF1.50 Warning 7200.00 4129.58 -3137.63 11078.83 803285 4122.37 -2080.66 10845.36 36.12 1305.68 473.69 831.99 989.48 4.14 OSF1.50 Warning 7250.00 413088 -3186.87 10119.38 8082.84 4122.60 -2110.01 1088583 36.16 1305.55 475.66 829.90 988.04 4.12 05F1.50 Warning 7300.00 4132.17 -3196.10 10159.92 8132.83 412283 -2139.38 10926.30 36.21 1305.43 477.62 827.80 986.60 4.11 OSF1.50 Warning 735000 4133.46 -3225.34 1020046 818282 4123.05 -216870 10966.76 36.26 1 530 47960 825.71 985.16 4.09 OSF1.50 Warning 7377.37 4134.17 -3241.34 1022265 821018 4123.18 -2184.76 10988.91 36.2 480.671 824.561 984.381 4081 OSF1.50 Warning End of results Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 16 of 24 Field: Nikadchuq Well: SP09-NO Structure: Spy Island Borehole: SP09-N/L1 Slot SP09 Trajectory: SP09-NSL1(PI) Client: En,Petroleum Type: Del Plan Coordinate System: NA027 Alaska State Plane Zone 04.US Feet North Reference: True Grid Convergence Angle: 009024571 Grid Scale Factor: 0999900155 Magnetic Declination: 19484' Magnetic Declination Date: February 07 2014 Magnetic Model: BGGM 2013 Reference Point Northlna Eastina Elevation Structure Unc. Slot Unc. 6053657 280(ftUS) 511668 320(ftUS) 54.100(ft)MSL 0 000(II)(1 vgma) 0.000(ft)(1 sigma) Tralectory Error Model:ISCWSAO 3-0 95.000:Confidence 2.7955 sigma SurveNna Woa:While Drilling Description Part MD From(8) MD To(ft)EOU Fret)(7t) Survey Tool Type Mole Size(in) Casing Diameter(1n) Borehole I Survey 1 0000 41.000 1/100.000 SLB_NSG+SSHOT-Depth Only-No Global 30.000 30.000 SP09-N9/5P09-N9(P1) 1 41.000 1000.000 1/100.000 SLB NSG+SSHOT-No Global 30.000 30.000 SP09-N9/SP09-N9(P1) 1 1000.000 10400.000 1/100.000 SLB Mvv0+GMAG-No Global 30.000 30.000 SPD9-N9/5P09-N9(Pt) 1 10400.000 18372.697 1/100.000 SLB_UNKNOWN-No Global 30000 30.000 SP09-N9L1/SP09-N9L1(P1) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (8) (8)' (ft) (9) (8) (8) (8) (t) (8) (8) (8) (ft) All lord minima indicated. Results filtered:Depth 7100008 ss MD c 17377.37 ft Results filtered:Ct-Ct separation<s 1500.00 ft Results highlighted:Ct-Ct separation sa 1320.008 7100.00 4055.27 2792.55 1911.91 6726.29 3713.67 622.94 332335 56.46 1864.62 116.90 174772 1786.05 24.30 OSF1.50 Pass 7150.00 4057.55 2768.43 1955.65 673698 3715.00 630.94 3330.30 56.21 1816.84 118.02 1698.82 1737.52 2345 OSF1.50 Pass 7200.00 4060.62 274375 1999.02 6749.09 3718.25 638.52 3338.88 51.77 1769.18 118.14 1651.04 1888.78 22.81 OSF1.50 Pass 7250.00 4063.58 271777 2041.64 675773 3717.32 804.99 3342.50 48.07 1721.34 118.25 1603.08 1641.86 22.17 OSF1.50 Pass 7300.00 4066.08 269036 2083.37 676466 3718.18 660.18 3347.01 43.66 1673.25 11829 155496 1593.75 21.54 OSF1.50 Pass 7350.00 4068.10 266154 212418 676988 3718.83 654.09 3350.41 38.57 1624.99 11842 1506.57 1545.40 20.90 06F1.50 Pass 7400.00 4069.65 263136 2164.01 677339 371926 656.72 3352.69 32.96 157660 118.26 1458.34 1497.12 20.30 OSF1.50 Pass 745000 407073 259985 2202.82 677517 3719.48 658.05 3353.85 27.06 1528.15 118.17 1409.98 1448.73 19.69 OSF1.50 Pass 7500.00 407133 256705 2240.55 677523 371949 658.10 3353.89 21.24 1479.70 117.98 1361.74 1400.42 19.10 OSF1.50 Pass 7550.00 407146 253300 2277.16 6773.56 371928 666.85 335280 15.76 1431.32 117.71 1313.82 1352.21 18.52 OSF1.50 Pass 7800.00 4071.11 2497.74 231260 677017 3718.86 654.31 3350.60 10.89 1383.07 117.40 1285.87 1304.17 17.94 OSF1.50 Pass 7650.00 4070.44 2461.92 2347.48 676594 3718.34 651.14 3347.85 13.38 1334.94 117.05 1217.89 1256.27 17.37 OSF1.50 Pass 770000 4089.83 242723 238348 6763.32 371802 649.17 3346.14 18.65 1286.80 116.72 1170.08 1208.35 1679 OSF1.50 Pass 7750.00 406931 2393.82 242067 876243 371791 648.51 3345.56 23.74 1238.71 116.41 1122.30 1160.47 1620 06F1.50 Pass 7800.00 4068.88 236173 245901 6783.28 3718.01 649.15 3346.11 28.39 119073 116.10 1074.83 1112.00 1562 OSF1.50 Pass 7850.00 4068.53 233099 249844 6765.87 371833 651.09 3347.80 3242 1142.95 115.79 1027.15 1065.11 15.03 OSF1.50 Pass 7900.00 406816 2301.51 253882 677001 371885 654.19 3350.50 3420 1095.38 115.49 97089 1017.75 14.44 OSF1.50 Pass 795000 406766 227225 257936 6774.42 3719.39 657.49 335337 33.50 1048.00 115.14 93286 97000 13.86 OSF1.50 Pass 8000.00 4067.16 2243.00 2619.91 6778.83 371994 660.80 335624 3278 1000.85 114.73 886.12 923.72 1328 OSF1.50 Pass 8050.00 406667 221375 266045 6783.24 3720.49 66410 335910 32.06 953.97 11426 839.72 877.16 12.71 OSF1.50 Pass 8100.00 4066.17 2184.49 2701.00 678765 372103 667.40 3361.97 31.34 907.41 11370 793.71 83097 12.15 00F1.50 Pass 8150.00 4065.68 2155.24 2741.55 679206 3721.58 670.71 3364.84 30.61 861.20 113.04 748.17 78521 11.60 OSF1.50 Pass 825500 4065.18 2125.98 2782.09 6796.47 3722.12 674.01 336771 29.88 815.43 11226 703.17 739.95 11.06 0551.50 Pass 8250.00 4064.68 2096.73 282264 6800.88 372267 677.31 3370.58 2014 770.15 111.34 658.81 69528 1053 OSF1.50 Pass 8300.00 406419 2067.48 2863.18 6805.29 3723.22 680.62 3373.45 2841 72546 11024 615.23 651.33 10.02 OSF1.50 Pass 835000 4063.70 2038.22 290373 6809.70 372376 68392 3376.32 27.66 681.49 106.92 57257 608.24 9.53 OSF1.50 Pass 8400.00 406372 2008.97 2944.28 6814.18 372432 687.27 3379.23 2687 638.65 10731 531.34 566.47 9.06 OSF1.50 Pass 8450.00 4064.62 1979.72 2984.82 6818.76 372469 690.71 338222 2611 59739 105.31 492.07 528.54 8.64 OSF1.50 Pass 8500.00 406629 1950.49 302535 682344 3725.47 694.21 3385.26 25.37 558.01 102.86 455.15 48880 8.26 OSF1.50 Pass 8550.00 406809 1921.25 306587 6828.14 372605 897.73 3388.32 2462 520.50 9991 420.59 45325 7.94 OSF1.50 Pass 8600.00 406988 189202 310640 6832.83 3726.63 701.25 3391.38 23.87 485.21 96.41 38880 420.30 767 00F750 Pass 8650.00 407167 186279 3146.92 6837.53 3727.21 704.77 3384.43 23.12 45264 9231 36033 39048 ��7.4g80551.50 Pass 8700.00 407346 1833.55 318745 6842.22 3727.80 708.28 339749 2237 42343 87.66 335.78 36436747 OSF1.50 Pass 8750.00 4075.26 1804.32 322797 6846.92 3728.38 711.80 3400.54 21.61 398.33 82.68 315.65 342 00F1.50 Pass 8800.00 4077.05 1775.09 3288.50 6851.61 3728.96 715.32 340360 20.86 378.14 77.87 30028 32559 05F7.50 Pass 8850.CO 4078.84 1745.86 3309.02 6856.31 3729.54 718.84 3406.65 20.10 363.70 74.07 289.63 313.68 7.52 OSF1.50 Pass 890000 4080.49 171662 3349.55 6800.99 373012 72234 3409.70 19.33 355.54 72.29 283.25 306.71 7.54 OSF150 Pass 8950.00 4081.35 168738 339010 6865.58 3730.69 725.78 341268 18.0 9199e1 72.13 281.34 304.75 7.51 OSF1.50 Pass 8952.36 408136 168600 3392.01 6865.79 373072 725.94 341282 18.55 353.53 72.231 281.291 304.731 7.50 00F150 Pass 9000.00 408172 165814 343065 6870.11 3731.25 729.17 3415.63 17.85 357.91 75.54 28237 308.91 725 OSF1.50 Pass 9050.00 4082.10 162889 347121 6874.64 3731.81 732.57 3418.58 17.12 369.08 80.81 288.26 314.56 6.98 OSF1.50 Pass 910000 4082.48 159965 3511 76 6879.17 373237 735.96 3421.53 16.39 388.38 86.84 29255 327.85 6.79 05F1.50 Pass 9150.00 4082.85 1570.41 355231 6883.70 373294 739.35 3424.48 1566 409.06 9277 318.28 346.5 L'L 05F1.50 Pass 9200.00 4083.23 154116 359287 6888.23 3733.50 74275 3427.43 14.93 436.26 98.13 338.12 370.19 8. OSF1.50 Pass 9250.00 4083.60 151192 363342 689276 3734.06 748.14 3430.37 14.21 487.19 102.76 3644.44 398.05 6.92 OSF1.50 Pass 9300.00 408398 1482.87 367398 6897.29 3734.62 748.54 343332 13.48 501.18 108.63 39455 429.45 7.15 06F1.50 Pass 9350.00 4084.36 1453.43 371453 6901.82 3735.18 75293 3436.27 12.75 53784 108.84 427.60 46377 7.45 OSF1.50 Pass 9400.00 4084.97 142418 375508 690.38 373575 75834 3439.23 11.93 576.23 112.45 463.78 500.63 779 OSF1.50 Pass 9450.00 4085.75 139493 379562 6910.94 3736.31 759.78 3442.21 11.20 616.53 114.82 501.91 53948 8.18 OSF1.50 Pass 9500.00 4086.53 1365.68 3836.16 6915.51 3736.88 763.18 3445.18 1047 658.13 116.41 541.72 57929 8.60 OSF1.50 Pass 9550.00 408731 133642 387671 6920.07 373744 766.60 3448.15 09.74 700.80 117.81 582.89 621.55 9.04 OSF1.50 Pass 9600.00 4088.06 1307.17 391725 892464 373801 77002 3451.12 0902 74435 119.17 62518 664.27 9.50 06F1.50 Pass 9650.00 4088.86 1277.92 395779 6929.20 3738.58 773.44 345409 08.30 788.64 12024 668.41 707.85 9.97 00F1.50 Pass 9700.00 4089.64 1248.66 399833 6933.77 373914 776.88 345706 07.58 833.56 121.15 712.40 75215 10.46 OSF1.50 Pass 9750.00 4090.42 1219.41 403887 6938.33 3739.71 78028 3460.03 0616 878.99 121.05 757.05 79708 10.96 OSF1.50 Pass 9800.00 409119 1190.16 407942 6942.90 3740.27 783.70 346300 06.15 924.88 122.64 602.24 84248 11.47 OSF1.50 Pass 9850.00 409190 1160.90 411995 6947.46 3740.84 787.11 346597 05.79 971.13 123.25 847.88 888.32 11.98 OSF1.50 Pass 9900.00 409188 1131.65 416051 695193 3741.39 790.48 3468.88 0595 1017.46 123.80 603.67 93429 12.50 00F7.50 Pass 995000 4091.11 1102.40 4201.05 6956.31 3741.94 793.74 347173 05.73 1063.86 124.30 939.55 980.35 13.02 OSF1.50 Pass 10000.00 4090.23 1073.15 4241.60 6960.67 374248 79701 347457 05.11 1110.51 12476 98576 1028.70 13.54 OSF1.50 Pass 1005000 4089.35 1043.91 4282.14 6965.04 3743.02 600.29 347741 04.49 1157.43 125.17 1032.26 1073.35 14.06 OSF150 Pass 10100.00 4088.47 1014.68 432268 6989.40 3743.56 803.56 348025 03.87 1204.58 125.54 1079.04 1120.25 14.59 OSF1.50 Pass 10150.00 408760 985.41 4363.23 6973.77 3744.10 606.83 348309 03.26 125194 12288 1126.06 1167.38 15.13 OSF150 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 17 of 24 Trajectory:SP04-SE7L1(P3)Vs.SP09-149L1(P1) -..---- Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (') (6) (ft) (ft) (ft) 1020000 4085.72 956.17 4403.77 6978.14 3744.64 1810.10 3485.93 10265 129948 126.19 1173.28 1214.71 15.86 OSF1.50 Pass 10250.00 4085.84 926.92 4444.32 6982.50 3745.18 1813.37 3488.78 102.05 1347.18 128.49 1220.70 1262.22 16.20 OSF1.50 Pass 10300.00 4084.96 897.67 4484.88 6988.87 3745.72 1816.64 3491.62 10145 1395.03 128.76 1268.28 1309.89 1674 OSF1.50 Pass 10350.00 408420 868.42 4525.41 699125 3746.27 1819.92 349447 100.07 144305 127.01 1316.04 1357.74 1728 OSF1.50 Pass 10400.00 408419 839.17 4565.96 6995.73 3748.82 1823.27 349738 98.16 149135 127.24 1384.11 1405.89 17.83 OSF1.50 Pass 10450.00 4084.44 809.92 4806.51 7000.23 3747.38 1826.65 3500.31 97.51 1539.81 127.46 141235 1454.20 18.37 OSF1.50 Pass 10500.00 408469 780.67 4847.06 7004.74 3747.94 1830.03 3503.24 9687 158835 127.88 1480.87 1502.59 18.92 OSF1.50 Pass 10500.00 4084.95 751.42 4687.61 7009.25 3748.50 1833.40 3508.18 96.24 1636.97 12768 1509.09 1551.07 19.47 OSF1.50 Pass 10800.00 408520 72217 4728.18 7013.75 374906 1838.78 3508.11 95.62 1685.65 128.08 1557.58 1599.63 20.02 OSF1.50 Pass 10650.00 4085.45 69291 4768.71 7018.26 3749.61 1840.15 3512.04 9499 173440 128.27 1606.13 1648.25 20.57 OSF1.50 Pass 10700.00 4085.70 663.66 480926 7022.77 3750.17 1843.53 3514.98 94.38 1783.21 128.45 1654.76 169693 21.12 OSF1.50 Pass 10750.00 4085.95 634.41 4849.81 702727 3750.73 1846.91 351791 93.77 183206 128.63 1703.44 1745.67 21.67 OSF1.50 Pass 10800.00 408620 605.16 4890.38 7031.78 3751.29 1850.28 352084 93.17 1880.97 128.80 1752.17 1794.47 22.21 OSF1.50 Pass 10850.00 408645 575.91 4930.91 7036.29 3751.85 1853.66 3523.77 9269 1929.93 128.97 1800.95 1843.31 22.76 OSF1.50 Pass 10900.00 408644 546.66 4971.46 7040.76 3752.40 1857.01 3528.89 93.40 1978.88 129.14 1849.74 1892.15 23.31 OSF1.50 Pass 10950.00 4086.10 517.41 5012.01 7045.20 3752.95 1860.33 3529.57 93.27 202762 129.30 1898.51 194098 23.86 OSF1.50 Pass 11000.00 4085.72 48816 5052.58 7149.63 3753.50 1863.65 353248 9272 2076.79 128.46 1947.33 1989.84 24.40 05F1.50 Pass 11050.00 408535 458.91 5093.11 7054.06 3754.05 1866.97 3535.34 92.17 2125.80 129.82 1996.18 2038.75 24.95 OSF1.50 Pass 11100.00 408498 429.68 5133.66 7058.49 3754.60 1870.29 3538.23 91.63 2174.85 129.77 2045.08 2087.70 25.49 OSF1.50 Pass 11150.00 4084.61 400.41 5174.21 7062.92 3755.15 1873.61 3541.11 91.09 222393 129.93 209401 2136.68 26.04 OSF1.50 Pass 11200.00 4084.24 37116 5214.76 7067.36 3755.70 1876.93 3543.99 90.56 2273.05 130.08 2142.97 2185.69 26.58 OSF1.50 Pass 11250.00 408387 341.92 5255.31 7071.79 3758.25 1880.25 3546.88 90.04 232219 130.23 219196 223473 27.13 OSF1.50 Pass 11300.00 4083.49 312.67 5295.86 7076.22 3756.80 1883.57 3549.76 89.52 2371.36 130.37 224099 2283.80 27.67 OSF1.50 Pass 11350.00 4083.15 283.42 5336.41 7080.66 375735 1886.89 3552.65 88.39 2420.56 130.52 229004 2332.91 28.21 OSF1.50 Pass 11400.00 4083.16 25417 5376.96 7085.13 3757.90 189025 3555.56 86.06 2489.83 130.86 233917 2382.09 28.75 OSF1.50 Pass 11450.00 4083.60 224.92 5417.51 7089.66 3758.46 1893.64 3558.51 83.53 2519.18 130.80 2388.38 2431.34 - 29.30 OSF1.50 Pass 11500.00 4084.30 195.67 5458.08 709423 3759.03 1897.08 3561.48 82.80 2568.57 130.94 2437.63 2480.64 29.84 OSF1.50 Pass 11550.00 4085.00 168.42 549881 7098.79 3759.59 1900.48 3584.45 82.27 261798 131.09 2486.89 2529.95 30.38 OSF1.50 Pass 11600.00 4085.70 13717 5539.15 7103.35 3760.16 1903.89 3567.42 81.75 286740 131.23 2536.18 2579.28 30.92 OSF1.50 Pass 11850.00 4086.40 107.92 557970 710791 3760.73 19137.31 3570.38 8124 2716.84 131.37 2585.47 2628.62 31.48 OSF1.50 Pass 11700.00 4087.10 78.67 5820.24 711247 376129 1910.73 3573.35 80.73 2766.29 131.51 2634.78 267798 3200 OSF150 Pass 11750.00 4087.80 49.42 5660.79 7117.04 3761.86 191415 3576.32 8023 2815.75 131.85 268410 2727.34 32.53 OSF1.50 Pass 11800.00 4088.50 20.17 5701.34 712160 3762.42 191756 3579.29 79.73 2865.22 131.79 273343 2776.72 33.07 OSF1.50 Pass 11850.00 4089.18 8.06 5741.88 7126.16 3762.89 1920.98 358226 80.03 291470 131.93 278277 2826.11 33.60 OSF1.50 Pass 11900.00 4089.52 -3833 578243 7130.68 376355 1924.36 3585.20 81.93 2964.16 13207 2832.09 2875.48 3414 OSF1.50 Pass 11950.00 4089.56 87.58 582298 7135.16 3764.10 1927.72 3588.11 81.98 3013.80 13221 2881.39 2924.82 34.67 OSF1.50 Pass 12000.00 408159 -96.83 5863.53 7139.64 3764.66 1931.08 3591.03 81.52 3063.05 132.35 2930.70 297418 35.20 OSF1.50 Pass 12050.00 4089.62 -12608 5904.09 7144.12 3765.21 1934.43 3593.94 81.07 3112.51 13248 2980.02 3023.55 35.74 OSF1.50 Pass 12100.00 4089.65 -155.33 5944.64 7148.59 3765.77 1937.79 3596.86 80.63 3181.98 132.62 3029.38 307293 36.27 OSF1.50 Pass 12150.00 4089.68 -184.58 5885.19 7153.07 3766.32 1941.14 3599.77 8019 3211.46 13276 3078.70 3122.31 36.80 OSF1.50 Pass 12200.00 408971 -21384 6025.74 7157.55 3766.88 1944.50 3602.89 79.76 3260.95 13289 3128.05 317171 37.32 OSF1.50 Pass 12250.00 4089.74 -24309 606629 7162.03 3767.43 1947.85 3605.80 79.33 3310.45 133.03 3177.42 3221.12 37.85 OSF1.50 Pass 12300.00 4089.77 -27234 6108.84 7166.51 3767.99 1951.21 3608.52 78.91 3359.96 133.17 3226.79 3270.54 38.38 OSF1.50 Pass 1235000 4089.84 -301.59 8147.39 7171.00 3768.54 1954.57 3611.44 77.32 3409.48 13330 3276.18 331997 38.90 OSF1.50 Pass 12400.00 4090.27 -330.84 6187.93 7175.52 3789.11 1957.96 3814.38 74.51 3459.04 13344 3325.60 3389.44 39.43 OSF1.50 Pass 1245000 4090.87 -36010 6228.48 7180.07 3768.67 1961.36 3617.34 74.10 3508.62 13357 3375.04 3418.93 39.95 OSF1.50 Pass 12500.00 409146 -38935 6269.02 7184.61 3770.23 1964.77 3820.29 73.69 3558.21 13371 3424.49 3488.43 40.48 OSF1.50 Pass 12550.03 4092.05 -41881 6309.57 7189.15 3770.79 1968.17 3623.25 73.29 3607.80 13385 3473.95 3517.93 41.00 OSF1.50 Pass 12800.00 4092.65 -447.88 8350.11 7193.69 3771.36 1971.57 3826.21 72.90 3657.39 133.99 3523.41 356743 41.52 OSF1.50 Pass 12650.00 4093.24 -477.12 6390.65 7198.24 3771.92 1974.97 3629.16 72.51 370700 134.12 3572.88 381694 42.04 OSF1.50 Pass 12700.00 409383 -508.37 643120 720278 3772.48 1978.38 3832.12 7213 3756.61 134.26 3622.35 3666.46 42.56 OSF1.50 Pass 12750.00 409442 535.63 6471.74 7207.32 3773.05 1981.78 3635.08 71.75 3806.22 13440 3671.82 3715.98 43.07 OSF1.50 Pass 12800.00 4095.02 -56488 6512.29 721186 3773.61 1985.18 3638.03 71.38 3895.84 134.53 3721.30 3765.51 43.59 OSF1.50 Pass 12850.00 4095.59 594.14 6552.83 7216.41 3774.17 1988.59 3640.98 7222 3905.46 134.67 3770.79 3815.04 44.11 OSF1.50 Pass 12800.00 4095.59 -623.39 6593.38 7220.88 3774.73 1991.94 3643.90 77.73 3955.04 134.81 3820.23 3864.53 44.62 OSF1.50 Pass 12950.00 409485 -652.63 6633.93 7225.27 377527 1985.23 3646.76 7966 4004.56 134.94 3869.62 3913.96 45.13 OSF1.50 Pass 13000.00 4094.02 -681.87 8674.48 722966 3775.81 1998.51 3849.61 79.32 4054.08 135.07 3919.00 3963.39 45.65 OSF1.50 Pass 13050.00 4093.20 -711.11 6715.03 7234.04 3776.38 200179 365248 78.97 4103.60 135.21 3968.40 4012.83 46.16 OSF1.50 Pass 13100.00 409237 -740.35 6755.58 723842 3776.90 2005.08 3655.31 78.63 4153.14 135.34 4017.80 406227 46.67 OSF1.50 Pass 13150.00 409155 -76959 6798.13 724280 3777.44 2008.38 3858.16 78.29 4202.68 135.47 406721 4111.72 47.18 OSF1.50 Pass 13200.00 4090.73 -798.83 6836.68 7247.18 3777.99 2011.64 3661.01 77.95 425222 135.81 4116.62 4161.18 47.89 OSF1.50 Pass 13250.00 4089.90 -828.07 687723 725156 3778.53 2014.92 3863.87 77.62 4301.78 135.74 416604 4210.65 48.20 OSF1.50 Pass 13300.00 4089.08 -857.31 6917.78 725594 3779.07 2018.20 3686.72 7729 435134 135.87 421148 4260.12 4870 OSF1.50 Pass 13350.00 4088.25 -886.56 6958.33 7260.32 3779.62 2021.49 3689.57 76.97 4400.90 136.01 4264.89 4309.59 49.21 OSF1.50 Pass 13400.00 4087.64 -915.80 6998.88 7264.72 3780.16 2024.78 367243 7445 445049 138.14 431435 4359.09 48.72 OSF1.50 Pass 13450.00 4087.15 -945.06 7039.42 7289.13 3780.71 2028.08 3675.30 74.13 4500.09 136.27 4383.82 4408.60 50.22 OSF1.50 Pass 13500.00 4086.67 -974.31 7079.97 7273.54 3781.25 2031.38 3878.17 73.82 454970 138.40 4413.29 4458.12 50.72 OSF1.50 Pass 13550.00 4086.18 -1003.57 7120.51 7277.95 3781.80 2034.89 3681.04 73.50 4599.31 136.54 446277 4507.65 51.23 OSF1.50 Pass 13800.00 4085.70 -1032.82 7161.08 7282.36 3782.35 2037.99 3883.91 7319 464893 138.67 451225 4557.17 51.73 OSF1.50 Pass 13650.00 4085.21 -1062.08 7201.60 728577 3782.89 2041.30 3886.78 72.89 4698.55 136.81 4581.74 4606.70 52.23 OSF1.50 Pass 13700.00 408473 -1091.34 7242.15 7291.18 378344 204460 3689.65 72.58 474817 136.94 4611.23 4656.24 52.73 OSF1.50 Pass 13750.00 4084.24 -1120.59 7282.69 7295.59 3783.99 2047.90 3892.52 72.28 479780 137.08 4660.72 4705.78 53.22 OSF1.50 Pass 13800.00 4083.75 -1149.85 7323.24 7300.00 3784.53 205121 3895.39 71.99 484743 13721 4710.22 4755.32 53.72 OSF1.50 Pass 13850.00 4083.35 -117910 7363.78 730442 3785.08 2054.52 3898.28 6957 489707 137.34 4759.73 4804.87 54.22 OSF1.50 Pass End of results • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 18 of 24 Field: Nikekchuq Well: SP09-N9 Structure: Spy Island Borehole: SP09-N9 Slot SP09 Trajectory: SP09-N9(P1) Client: Eni Petroleum Type: Clef Plan Coordinate System: NAD27 Alaska Stele Plena,Zone 04,US Feet North Reference: True Grld Convergence Angle: 009024571° Grid 50ie Factor: 0999900155 Magnetic Declination: 19.490° Magnetic Declination Date: February 03,2014 Magnese Model: BGGM 2013 Reference Point Northing ypp Elevation Structure Unc. Slot Unc 6053657 280(hUS) 511668.320(ftilS) 54 100(k)05L 0.000(k)(1 sigma) 0.000(k)(1 sigma) Tralectory Error Model:ISCW5A0 3-0 95.000%Confidence 2.7955 sigma Survevino Pros:While Drilling Description Part MD From(ft) MD To(8) EOU Freq(7q Survey Tool Type Hole Size 9n) Casing Diameter On) Borehole I Survey 1 0000 41.000 1/100.000 SLB NSG.SSHOT-Depth Only-No Global 30.000 30.000 SP09-99I SP09-N9(P1) 1 41.000 1000.000 1/100.000 SLB NSG.SSHOT-No Global 30.000 30.000 SP09-99 -99(P1) 1 1000.000 18363.223 1/100.000 SLB MVhD.GMAG-No Global 30000 30000 SP09-49/SP09-N9(P1) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EN( Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (k) (ft) (ft) _ (ft)_. (5) (k) (6) la) (°) (k) (6) _ (ftk (k) All local minima indicated. Results filtered'Depth 7100.00 ft cc MD<=17377.37 8 Results filtered'Ct-Ct separation<=1500.00 ft Results highlighted:Ct-Ct separation<=1320.00k 7100.00 4055.27 2792.55 191191 6728.29 3713.67 62294 3323.35 56.48 1884.62 118.80 174772 1786.05 24.30 OSF1.50 Pass 715000 4057.55 276843 195565 6736.98 3715.00 630.94 3330.30 56.21 1818.84 118.01 1698.82 1737.52 23.45 OSF1.50 Pass 7200.00 4000.62 2743.75 1999.02 6749.09 3716.25 638.52 3336.68 5177 1789.18 118.14 1651.04 1688.78 22.81 OSF1.50 Pass 7250.00 4063.58 271777 204164 6757.73 3717.32 84498 334250 48.07 1721.34 118.25 1603.09 1641.86 22.17 05F1.50 Pass 7300.00 4066.08 2690.38 208337 6764.66 3718.18 650.18 3347.01 4366 1673.25 118.29 1554.96 1593.75 2164 OSF1.50 Pass 7350.10 4068.10 2661.54 2124.18 6769.88 3718.83 654.09 3350.41 3857 1624.99 118.42 1506.57 1545.40 20.90 OSF1.50 Pass 7410.00 406965 2631.36 218401 6773.39 3719.26 656.72 335269 3286 1576.80 118.26 1458.34 1497.12 20.30 OSF1.50 Pass 745000 4070.73 2599.85 2202.82 6775.17 3719.48 658.05 3353.85 27.08 1528.15 118.17 1409.98 1448.73 1969 00F1.50 Pass 7510.00 4071.33 256705 2240.55 6775.23 3719.49 658.10 3353.89 21.24 1479.70 117.98 1361.74 1400.42 19.10 OSF1.50 Pass 7550.00 4071.46 2533.00 2277.16 6773.56 3719.28 656.85 3352.80 15.76 1431.32 117.71 1313.62 1352.21 18.52 OSF1.50 Pass 7600.00 4071.11 2497.74 2312.80 6770.17 3718.86 654.31 3350.60 10.69 1383.07 117.40 1265.68 1304.17 17.94 OSF1.50 Pass 7650.00 4070.44 2481.92 2347.48 6765.94 3718.34 651.14 3347.85 13.38 1334.94 117.05 1217.89 1256.27 17.37 OSF1.50 Pass 770000 4069.83 2427.23 2383.48 6763.32 3718.02 64917 334614 18.65 1286.80 116.72 1170.08 1208.35 16.79 OSF1.50 Pass 7750.00 4069.31 239382 2420.67 676243 371791 61851 3345.56 23.74 1238.71 116.40 1122.30 1160.47 1120 OSF1.50 Pass 7800.00 4068.88 2361.73 245901 6763.28 371801 64915 3346.11 28.39 1190.73 118.10 1074.64 1112.69 15.62 OSF1.50 Pass 7850.00 4068.53 2330.99 2498.44 6765.87 3718.33 65109 3347.80 32.42 1142.95 115.79 1027.15 1085.11 15.03 OSF1.50 Pass 790000 4068.16 2301.51 253882 677001 371885 654.19 3350.50 3420 1095.38 11548 97990 1017.75 1444 OSF1.50 Peas 7950.00 4067.66 227225 2579.36 6774.42 371939 65749 3353.37 33.50 1048.00 11514 93286 970.60 13.86 OSF1.50 Pass 8000.00 4067.16 2243.00 261991 6775.83 3719.94 660.80 3356.24 32.78 1000.85 114.73 886.12 92372 13.26 OSF1.50 Pass 8050.00 4066.67 2213.75 2860.45 6783.24 3720.49 684.10 3359.10 32.06 953.97 114.25 839.72 877.16 12.71 OSF1.60 Pass 8100.00 4066.17 2184.49 270100 6787.6.5 3721.03 667.40 3361.97 31.34 90741 11369 793.71 830.97 12.15 OSF1.50 Pass 8150.00 4065.68 2155.24 274155 6792.08 3721.58 870.71 3364.84 30.61 861.20 11304 748.17 785.21 11.60 OSF1.50 Pass 8200.00 406518 2125.98 2782.09 6796.47 3722.12 67401 3367.71 29.88 81543 112.28 703.17 739.95 11.06 OSF1.50 Pass 8250.00 4064.68 209673 282264 6800.88 3722.67 677.31 3370.58 29.14 770.15 111.33 658.81 695.29 10.53 00F1.50 Pass 830000 4064.19 206748 2863.18 6805.29 3723.22 680.62 3373.45 28.41 72546 110.23 615.23 651.33 10.02 OSF1.50 Pass 8350.00 4063.70 203822 290373 6809.70 3723.76 683.92 3376.32 27.66 681,49 10892 57257 608.24 9.53 OSF1.50 Pass 8400.00 406372 200697 294428 6814.18 372432 697.27 3379.23 2687 63865 107.31 531.34 566.47 9.06 05F1.50 Pass 8450.00 4064.62 197972 2984.82 6818.76 3724.89 690.71 3382.22 26.11 597.39 105.31 492.07 526.54 8.84 OSFf.50 Pass 8500.(0 4066.29 1950.49 3025.35 682344 3725.47 694.21 3395.26 25.37 558.01 102.86 456.15 488.80 8.26 OSFf 50 Pass 0550.00 4068.09 1921.25 3065.87 682814 3726.0E 697.73 338832 24.62 520.50 99.91 420.59 453.25 7.94 OSF1.50 Pass 869000 4069.88 1892.02 3106.40 6832.83 3726.63 701.25 339138 23.87 485.21 9641 38880 420.30 7.67 05F1.50 Pass 8650.00 4071.67 1862.79 3146.92 6837.53 372721 704.77 3394.43 23.12 45264 92.31 36033 390.46 7.48 OSF1 50 Pass 8700.00 407346 1833.55 318745 684222 3727.80 706.28 3397.49 2237 423.43 87.66 33578 364.36 737 OSF1.50 Pass 8750.00 4075.26 1804.32 3227.97 6846.92 3728.38 711.80 3400.54 21.61 39833 8268 315.65 342.57F-T1O5F1.50 Pass 8800.00 4077.05 1775.09 3268.50 685161 3728.96 715.32 3403.60 20.86 378.14 77.87 300.28 32559 7 OSF1.50 Pass 5850.00 407884 174586 3309.02 6856.31 3729.54 718.84 3406.65 20.10 36170 74.07 289.63 313.68 7.52 OSF1.50 Pass 8900.00 4080.49 1716.62 3349.55 6860.99 3730.12 72234 3409.70 1913 355.54 72.29 283.25 306.71 7.54 OSF1.50 Pass 8950.00 4081.35 1687.38 339010 6865.58 3730.89 725.78 341268 113.09 X3.41 7213 281.34 30475 7.51 OSF1.50 Pass 8952.36 4081.36 1686.00 339201 6865.79 3730.72 725.94 3412.82 18.55 353.5 72.231 281.291 304731 7.50 OSF1.50 Pass 9000.00 4081.72 1658.14 343085 6870.11 3731.25 72917 3415.63 17.85 357.91 75.54 282.37 306.91 7.25 OSF1.50 Pass 9050.00 408210 1628.89 3471.21 687464 3731.81 73257 3418.58 17.12 369.08 80.81 288.26 314.56 6.98 OSF1.50 Pass 9100.00 408248 1599.65 351176 6879.17 3732.37 735.96 3421.53 16.39 386.38 8684 299.55 327.85 679 OSF1.50 Pass 9150.00 4082.85 157041 3552.31 6883.70 3732.94 739.35 342448 15.86 409.06 9277 316.28 3465 *Ai OSF1.50 Pass 9200.00 4083.23 1541.16 3592.87 6888.23 3733.50 742.75 3427.43 14.93 438.28 98.13 338.12 370.19 - OSF1.50 Pass 925000 4083.60 1511.92 363342 6892.76 3734.06 746.14 3430.37 14.21 467.19 102.75 364.44 398.05 6.92 OSF1.50 Pass 9300.00 4083.98 1482.67 367398 6897.29 3734.62 749.54 3433.32 13.48 501.18 10663 394.55 429.46 7.15 OSF1.50 Pass 9350.00 4084.36 1453.43 371453 6901.82 373518 752.93 3436.27 12.75 537.64 109.83 427.80 483.77 7.45 OSF1.50 Pass 9400.00 4084.97 1424.18 375508 6906.38 3735.75 756.34 3438.23 1193 576.23 112.45 46378 500.63 7.79 OSF1.50 Pass 9450.00 4085.75 1394.93 3795.62 6910.94 373631 759.76 3442.21 11.20 618.53 114.62 501.92 539.49 8.18 OSF1.50 Pass 9500.00 4086.53 1365.68 3836.16 6915.51 3736.88 763.18 3445.18 10.47 668.13 116.41 541.72 579.89 8.60 OSF1.50 Pass 9550.00 4087.31 133642 3876.71 6920.07 373744 766.60 3448.15 09.74 700.80 11791 58289 621.56 9.04 OSF1 50 Pass 9600.00 408808 1307.17 3917.25 6924.64 373801 77002 3451.12 09.02 744.35 119.16 625.19 664.27 9.50 00F1.50 Pass 9650.00 4088.86 1277.92 3957.79 6929.20 3738.58 77344 3454.09 08.30 788.84 120.24 668.41 707.85 9.97 00F1.50 Pass 9700.00 4089.64 1248.86 3998.33 6933.77 3739.14 776.86 345706 07.58 833.56 121.15 712.40 752.15 10.46 OSF1.50 Pass 9750.00 4090.42 121941 4038.87 6938.33 373871 780.28 3460.03 06.86 878.99 12194 757.05 797.06 10.96 00F7.50 Pass 9800.00 4091.19 1190.16 4079.42 6942.90 3740.27 783.70 346300 06.15 924.88 122.83 802.25 84249 11.47 OSF1.50 Pass 9850.00 4091.90 116090 4119.98 6947.46 3740.84 787.11 346597 05.79 971.13 123.24 847.88 888.33 11.98 OSF1.50 Pass 9900.00 4091.88 1131.85 4160.51 6851.93 3741.39 790.48 346888 05.95 1017.46 123.79 893.67 934.29 12.50 OSF1.50 Pass 9950.00 4091.11 110240 420105 6956.31 374194 793.74 347173 05.73 1063.86 124.30 939.56 980.35 13.02 OSF1.50 Pass 10000.00 4090.23 1073.15 4241.60 6960.67 374248 797.01 347457 05.11 1110.51 12475 98576 1026.70 13.54 OSF1.50 Pass 10050.00 4089.35 1043.91 428214 6965.04 3743.02 690.29 347741 0449 1157.43 125.17 103227 1073.35 14.06 OSF1.50 Pass 10100.00 4088.47 101466 4322.68 6969.40 3743.56 803.56 348025 03.87 1204.58 125.54 1079.04 1120.25 14.59 OSF1.50 Pass 10150.00 4087.60 985.41 4363.23 6973.77 3744.10 806.83 3483.09 03.26 1251.94 125.88 1126.06 1167.38 15.13 OSF1.50 Pass 10200.00 4086.72 956.17 440377 6978.14 3744.64 810.10 348593 02.65 1299.48 128.19 1173.29 1214.71 15.86 OSF1.50 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 19 of 24 Trajectory:SP04-SE7L1(P3)Vs.5P09-N9(P1) Minimum AIbeads Trawling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Aaim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (8) (8) (ft) (ft) (ft) (9) (8) (It) C) (ft) (ft) (ft) (ft) 10250.00 4085.84 926.92 4444.32 6982.50 3745.18 1813.37 3488.78 102.05 1347.18 126.48 1220.70 1262.22 18.20 OSF1.50 Pass 10300.00 4084.96 897.67 4484.86 6986.87. 3745.72 1816.64 3491.62 101.45 1395.03 128.75 1288.28 130989 16.74 OSF1.50 Pass 10350.00 408420 868.42 4525.41 6991.25 3746.27 1819.92 3494.47 100.07 1443.05 127.01 1316.04 1357.74 17.28 OSF1.50 Pass 10400.00 408419 839.17 4565.96 699573 3746.82 1823.27 3497.38 98.16 1491.35 127.24 1364.11 1405.89 17.83 OSF1.50 Pass 10450.00 4084.44 809.92 4806.51 7000.23 3747.38 1826.65 3500.31 97.51 1539.81 127.48 1412.35 145420 18.37 OSF1.50 Pass 10500.00 408469 780.67 4647.06 7004.74 3747.94 1830.03 3503.24 96.87 1588.35 127.67 1460.68 1502.60 18.92 OSF1.50 Pass 10550.00 408495 751.42 4887.61 7009.25 3748.50 1833.40 3506.18 96.24 1836.87 127.88 1509.09 1551.08 19.47 OSF1.50 Pass 10600.00 4085.20 722.17 4728.16 701175 374906 1836.78 3509.11 95.62 1685.65 128.07 1557.58 1599.63 20.02 OSF1.50 Pass 10650.00 408545 692.91 4768.71 7018.26 3749.61 1840.15 3512.04 94.99 1734.40 128.26 1606.14 1648.25 20.57 OSF1.50 Pass 10700.00 408570 663.86 4809.26 7022.77 3750.17 1843.53 3514.98 94.38 1783.21 128.45 184.76 1696.94 21.12 OSF1.50 Pass 10750.00 408595 63441 4849.81 7027.27 3750.73 184691 351791 93.77 1832.08 128.63 1703.44 1745.67 21.67 OSF1.50 Pass 10800.00 4086.20 605.16 489036 7031.78 3751.29 1850.28 3520.84 93.17 1880.97 128.80 1752.17 1794.47 22.21 OSF1.50 Pass 10850.00 4086.45 57591 4930.91 7038.29 3751.85 1853.66 3523.77 92.69 1929.93 128.97 1800.96 1843.31 22.76 OSF1.50 Pass 10800.00 4086.44 546.66 4971.46 7040.76 3752.40 1857.01 3526.69 93.40 1978.88 129.14 1849.74 1892.15 23.31 OSF1.50 Pass 10950.00 4086.10 517.41 5012.01 7045.20 3752.95 1880.8 3529.57 93.27 2027.82 12930 1898.52 1940.98 23.86 OSF1.50 Pass 11000.00 4085.72 488.18 5052.56 7049.63 3753.50 1863.65 3532.46 9272 2076.79 129.46 1947.33 1989.84 2440 0571.50 Pass 11060.00 4085.35 458.91 5093.11 7054.06 3754.05 1866.97 3535.34 92.17 2125.80 128.62 1996.19 2038.75 24.95 OSF1.50 Pass 11100.00 408498 429.66 5133.66 7058.49 375480 1870.29 3538.23 91.63 2174.85 129.77 2045.08 2087.70 25.49 OSF1.50 Pass 11150.00 4084.61 400.41 5174.21 7062.92 375515 1873.61 3541.11 91.09 2223.93 129.92 2094.01 2136.68 26.04 OSF1.50 Pass 11200.00 4084.24 371.16 5214.76 7087.38 3755.70 1878.93 3543.99 90.56 2273.05 130.07 2142.97 2185.69 26.58 0571.50 Pass 11250.0D 4083.87 341.92 5255.31 7071.79 3756.25 1880.25 3546.88 90.04 2322.19 130.22 2191.96 2234.73 27.13 0571.50 Pass 11300.00 4083.49 312.67 5295.86 7076.22 3756.80 1883.57 3549.76 89.52 2371.36 130.37 2240.99 228381 27.67 OSF1.50 Pass 11350.00 408315 283.42 5336.41 7080.66 3757.35 1888.89 3552.65 88.39 2420.56 130.52 2290.04 2332.91 28.21 OSF1.50 Pass 11400.00 4083.16 254.17 5376.96 7085.13 3757.90 1890.25 355556 86.06 2469.83 130.88 2339.17 2382.09 28.75 OSF1.50 Pass 11450.00 4083.60 22492 5417.51 7089.66 3758.46 1893.64 3558.51 83.53 2519.18 130.80 2388.38 243134 29.30 OSF1.50 Pass 11500.00 4084.30 195.67 5458.06 7094.23 3759.03 1897.06 356148 82.80 2568.57 130.94 2437.63 2480.64 29.84 OSF1.50 Pass 11550.00 4085.00 166.42 5498.61 7098.79 3759.59 1900.48 3564.45 82.27 2617.98 131.08 2486.90 2529.95 30.38 OSF1.50 Pass 11600.00 4085.70 137.17 5539.15 7103.35 3760.16 1903.89 3567.42 81.75 266740 131.23 2536.18 257928 30.92 OSF1.50 Pass 11650.00 4086.40 107.92 5579.70 7107.91 3760.73 1907.31 3570.38 81.24 2716.84 131.37 2585.47 2628.62 31.46 OSF1.50 Pass 11700.00 4087.10 78.67 5620.24 7112.47 3761.29 1910.73 3573.35 80.73 2766.29 13151 263478 267798 32.00 OSF1.50 Pass 11750.00 408780 49.42 5660.79 7117.04 3761.86 1914.15 3576.32 80.23 2815.75 131.65 2684.10 2727.34 32.53 OSF1.50 Pass 11800.00 4088.50 20.17 5701.34 7121.60 3762.42 1917.56 3579.29 79.73 2865.22 131.79 2733.43 2776.72 33.07 OSF1.50 Pass 11850.00 4089.18 -9.08 5741.88 7126.16 3762.99 1920.98 3582.28 80.03 2914.70 131.93 2782.77 2826.11 33.61 OSF1.50 Pass 11900.00 4089.52 -38.33 5782.43 7130.68 376355 1924.36 358.20 81.93 2964.16 132.07 2832.09 2875.48 34.14 OSF1.50 Pass 11950.00 4089.56 -67.58 5822.98 7135.16 3764.10 1927.72 3588.11 81.98 3013.60 132.21 2881.39 2924.82 34.87 OSF1.50 Pass 12000.00 4089.59 -96.83 5863.53 7139.64 3764.66 1931.08 3591.03 81.52 3063.05 132.34 2930.70 297418 8.20 OSF1.50 Pass 12050.00 4089.62 -126.08 5904.09 7144.12 376521 1934.43 359394 81.07 3112.51 132.48 2980.03 3023.55 8.74 OSF1.50 Pass 12100.00 4089.65 -155.33 5944.64 7148.59 376577 1937.79 359886 80.63 3181.98 132.62 3029.36 3072.93 8.27 OSF1.50 Pass 12150.00 4089.68 -184.58 5685.19 7153.07 3766.32 1941.14 3599.77 80.19 321146 132.76 3078.70 3122.32 8.80 OSF1.50 Pass 12200.00 4089.71 -213.84 6025.74 7157.55 3766.88 194450 3602.69 79.76 3260.95 132.89 3128.06 3171.72 37.32 OSF1.50 Pass 12250.00 4089.74 -243.09 6066.29 7162.03 3767.43 1947.85 3805.60 79.33 3310.45 133.03 317742 3221.12 37.85 OSF1.50 Pass 12300.00 4089.77 -272.34 6106.84 7166.51 3767.99 1951.21 3608.52 78.91 3359.96 133.16 3226.79 3270.54 38.38 OSF1.50 Pass 12350.00 4089.84 -30159 6147.39 7171.00 3768.54 1954.57 3611.44 77.32 3409.48 13330 3276.18 3319.97 38.90 OSF1.50 Pass 12400.00 4090.27 -330.84 8187.93 7175.52 3769.11 1957.96 3614.8 74.51 3459.04 133.43 3325.60 3369.44 39.43 OSF1.50 Pass 12450.00 409087 -360.10 6228.48 7180.07 3769.67 1961.8 3617.34 74.10 3508.62 13357 3375.05 3418.93 39.95 OSF1.50 Pass 12500.00 409146 -389.35 6269.02 7184.61 3770.23 1964.77 3620.29 73.69 3558.21 133.71 3424.50 3468.43 40.48 0571.50 Pass 12550.00 409205 -418.61 6309.57 7189.15 3770.79 1968.17 3623.25 73.29 3607.80 133.85 3473.95 3517.93 41.00 OSF1.50 Pass 12800.00 4092.65 -447.86 6350.11 7193.69 3771.36 1971.57 3626.21 72.90 3657.39 133.98 3523.41 3567.43 41.52 OSF1.50 Pass 1280.00 409324 -477.12 6390.85 7198.24 3771.92 1974.97 3629.16 72.51 3707.00 134.12 3572.88 3616.95 42.04 OSF1.50 Pass 12700.00 4093.83 -506.37 6431.20 7202.78 3772.48 1978.8 3832.12 72.13 3758.61 134.26 3622.35 3666.46 42.56 OSF1.50 Pass 12750.00 4094.42 -535.63 6471.74 720732 3773.05 1881.78 368.08 71.75 806.22 13440 3671.82 3715.98 43.07 OSF1.50 Pass 12800.00 4095.02 -564.88 6512.29 7211.86 3773.61 1985.18 363803 71.38 3855.84 134.53 3721.8 3765.51 43.59 OSF1.50 Pass 12850.00 409559 -594.14 6552.83 721641 3774.17 1988.59 364089 72.22 3905.46 134.67 3770.79 815.04 4411 0571.50 Pass 12900.00 4095.59 -623.39 6593.8 7220.88 3774.73 1991.94 364390 77.73 395504 134.80 3820.23 386453 44.62 OSF1.50 Pass 12950.00 4094.85 -652.63 663393 7225.27 3775.27 1995.23 3646.76 79.66 4004.56 134.94 389.62 3913.96 45.14 0571.50 Pass 13000.00 4094.02 -681.87 6674.48 7229.66 3775.81 1998.51 3649.61 79.32 4054.08 18.07 3919.01 3963.8 45.85 OSF1.50 Pass 13050.00 409320 -711.11 671503 7234.04 377636 2001.79 365246 78.97 4103.60 135.20 3968.40 4012.83 46.16 OSF1.50 Pass 13100.00 4092.37 -740.35 6755.58 728.42 3776.90 2005.08 3655.31 78.63 4153.14 13534 4017.80 406227 46.67 0571.50 Pass 13150.00 4091.55 -769.59 8796.13 7242.80 377744 2008.36 3658.16 78.29 420288 135.47 4067.21 4111.73 47.18 OSF1.50 Pass 13200.00 4090.73 -798.83 6836.68 7247.18 3777.99 2011.64 3661.01 77.95 4252.22 135.60 411662 4161.18 47.69 OSF1.50 Pass 13250.00 408990 -828.07 687723 7251.56 377853 2014.92 3663.87 77.62 48178 18.74 4166.04 421065 48.20 OSF1.50 Pass 13300.00 4089.09 857.31 691778 725594 3779.07 201820 3668.72 77.29 4351.34 18.87 421547 4260.12 48.70 OSF1.50 Pass 13350.00 4088.25 -886.56 6958.33 7260.32 3779.62 2021.49 3669.57 7697 4400.90 138.00 426490 4309.59 49.21 0571.50 Pass 13400.00 4087.64 -915.80 6998.88 7264.72 3780.16 2024.78 3672.43 74.45 4450.49 18.13 4314.8 4359.09 49.72 OSF1.50 Pass 13450.00 4087.15 -945.06 7039.42 7269.13 3780.71 2028.08 367530 74.13 4500.09 18.27 4363.82 4408.61 50.22 OSF1.50 Pass 13500.00 4086.67 -974.31 7079.97 7273.54 3781.25 2031.39 3678.17 73.82 4549.70 18.40 4413.30 4458.12 50.72 OSF1.50 Pass 13550.00 4086.18 -1003.57 7120.51 7277.95 3781.80 2034.69 3681.04 73.50 4599.31 18.54 4462.77 4507.65 51.23 OSF1.50 Pass 13600.00 4085.70 -1032.82 7181.06 7282.36 3782.35 2037.99 3683.91 73.19 4648.93 18.67 4512.26 4557.17 51.73 OSF1.50 Pass 1360.00 4085.21 -1062.08 7201.60 7286.77 3782.89 204130 3686.78 7289 4698.55 18.81 4561.74 4606.70 52.23 0571.50 Pass 13700.00 408473 -1091.34 7242.15 7291.18 3783.44 2044.60 368965 72.58 4748.17 136.94 461123 4656.24 52.73 OSF1.50 Pass 13750.00 4084.24 -1120.59 7282.69 7295.59 3783.99 2047.90 3892.52 72.28 4797.80 137.07 4860.72 4705.78 53.23 OSF1.50 Pass 13800.00 4083.75 -1149.85 7323/4 7300.00 3784.53 2051.21 369539 71.99 4847.43 137.21 4710.22 4755.32 53.72 OSF1.50 Pass 13850.00 4083.35 -1179.10 7363.78 730442 3785.08 2054.52' 3898.26 69.57 489707 137.34 4759.73 4804.87 54.22 0571.50 Pass End of results Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 20 of 24 Field: Nor 4c4cg Well SI75-N8 Structure: Spy Is/end Borehole: S)15-N2 Slot SP15 Trajectory. 5115-N8(P7) Client: Eni Petroleum Type: Del Plan Coordinate System: NAD27 Alaska State Plane.Zone 04,US Feel NorM Reference: True Grid Convergence Angle: 0.08976602° Grid Beale Facies. 0.999900153 Magnetic Declination: 19.041° Magnetic Declination Date: November 20,2014 Magnetic Model: BGGM 2013 Reference Point JforMing LAME §1 va52n Structure Unc. Slot Unc. 6053645 200(f1US) 511606.320(ftUS) 54 100(ft)MSL 0.000(11)(1 sigma) 0.000(11)(1 sigma) Tralectory Error Model:ISCWSA0 3-0 96.000%Confidence 2.7966 sigma Survevina Pro%While Drilling Description Part MD From(B) MD To(ft)EOU Frog(h) Survey Tool Type Hole Size(In) Casing Diameter(In) Borehole I Survey 1 0000 41.000 1/100.000 SLB NSG0SSHOT-Depth Only-No Global 16000 13.375 5115-N2/5115-N8(P1) 1 41.000 1000.000 1/100.000 SLB_NSGcSSHOT-No Globs 16000 13.375 6115N2/6115-N8(P1) 00.00 1 10 2500.000 1/100.000 SLB_6N4cGMAG-No Globe 18.000 13.375 S115N2/0115N8(P1) 2 1000.000 2668.873 1/100.000 SLB MWD+GMAG-No Globe 16.000 13.375 S115N2/6115N8(P1) 2 2688.873 4220.000 1/100.000 SLB_MVUD*GMAG-No Globe 12.250 9.825 6115N2/0115N8(P1) '3 2888.673 9236.523 1/100.000 SLB_MINDcGMAG-No Globs 12.250 9.625 516115-N82/S115B(P1) (0 3 9236.523 10640. 0 1/100.000 SLB_MNAcSAG-No Globe 8750 5.500 516115-N82/5115B(P1) /100.00 4 9238.523 16941.768 10 SLB MWDcGMAG-NO Globs 8750 5.500 S115N2/S115N8(P1) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference ND Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance O5F Rule Status (ft) 18) _ (ft) (ft) (8) (M) (M) CO (°) _ (5) (5) (ft) On All local minima indivated. Results filtered'.Depth 7100.00 ft c MD Cu 17377.37 ft Results filtered:Ct-Ct separation vs 1500.00ft Results highlighted'.Ct-Ct separation<=1320.00 ft 7100.00 4055.27 279255 1911.91 8823.51 401777 376361 2781.16 30.68 130398 11571 1188.27 1226.43 17.07 OSF1.50 . Pass 7150.00 4057.55 2768.43 1955.65 8775.37 401274 3731.78 2818.74 31.85 129287 115.36 1177.51 1215.55 16.97 OSFI.50 8. 7200.00 4060.62 2743.75 199902 8727.21 4007.70 369973 2852.33 33.54 1282.51 115.18 1167.34 1205.32 16.87 OSF1.50 ass 7250.00 4063.58 271777 2041.64 8678.74 4002.64 3667.47 2888.18 35.62 1273.87 116.63 1157.04 1195.51 16.54 OSF1.50 85.5 7300.00 4066.08 2890.36 208337 8629.91 3997.53 3634.98 2924.25 3772 1266.52 118.15 1148.37 1187.35 16.23 OSF1.50 ass 7350.00 4068.10 2661.54 2124.18 8570.20 399128 3595.20 2988.33 39.91 126103 12484 1136.39 1177.53 15.31 OSF7.50 8. 7400.00 4069.65 2631.36 216401 8377.99 396894 3458.36 3101.29 43.07 1254.02 126.88 1127.13 1169.02 14.95O5F1.50 885 7450.00 4070.73 2599.85 2202.82 8193.77 3944.07 3313 87 3212.69 4633 1243.25 131.58 1111.68 1155.13 )4 OSF1.50 ass 7500.00 4071.33 256705 2240.55 801944 391770 316679 3302.31 4967 1229.08 133.35 1095.72 1139.77 .. 05F1.50 88.5 7550.00 4071.46 253300 2277.16 7856.08 3890.76 3021.34 3371.46 53.08 1211.87 127.96 1083.91 1126.15 1 OSF1.50 ass 7800.00 4071.11 2497 74 2312.60 7704.05 3863.98 2880.64 3422.30 56.54 1192.03 122 94 1089.69 1109.69 14 67 OSFI.50 MS 7650.00 4070.44 2461.92 234748 7564.65 3838.20 274818 3457.06 5776 1189.22 11857 105064 1089.76 14.83 OSF1.50 ass 7700.00 4069.83 242723 2383.48 7441.97 3814.67 2629.65 3478.08 58.42 1142.03 114.90 1027.12 1065.02 15.05 OSF1.50 ass 7750.00 4069.31 2393.82 242067 7335.89 379381 2526.23 3488.92 59.50 111112 112.00 999.12 1036.04 15.03 OSF1.50 ass 7800.00 4068.88 236173 245901 7245.30 3775.69 2437.56 3492.75 61.00 107719 109.64 967.55 1003.69 14.89 OSF1.50 ass 785000 4068.53 2330.99 2498.44 7168.66 3780.18 2362.52 3492.09 6295 1040.87 107.82 933.05 968.59 14.63 OSF1.50 MSS 7900.00 4068.16 230151 2538.82 7103.94 374698 2299.26 3488.74 69.32 1002.75 106.35 896.40 931.44 14.29 OSF1.50 ass 7950.00 4067.66 2272.25 257936 7047.12 373533 2243.88 3483.70 68.51 983.88 105.13 858.75 893.39 1390 OSF1.50 ass 8000.00 4067.16 2243.00 261991 6996.60 372493 2194.82 3477.57 7172 924.87 104.02 820.66 85492 13.48 OSF1.50 865 8050.00 4088.67 2213.75 2660.45 6951.46 3715.63 2151.17 3470.78 7492 88531 103.04 782.27 816.21 13.02 OSF1.50 865 8100.00 4066.17 2184.49 270100 6910.94 370727 211218 3483.65 7808 84598 102.09 743.89 777.51 12.56 OSF1 50 eon 6150.00 406568 2155.24 2741.55 6874.42 3009.73 2077.19 3456.38 8119 806.84 101.18 705.66 738.98 12.09 OSF1.50 ass 8200.00 4065.18 2125.98 278209 684137 369290 2045.68 344911 84.23 788.08 10023 687.85 700.85 11.62 OSF1.50 aSS 8250.00 4064.68 2096.73 282264 681132 368670 2017.17 3441.94 87.17 729.89 99.28 630.63 663.31 11.15 OSF1.50 8300.00 4064.19 206748 2863.18 6783.92 3681.05 1991.29 3434.94 90.00 692.46 98.18 594.28 626.80 l0.69 OSF1.50 FISS 8350.00 4063.70 203822 290373 6758.84 3675.89 1967.70 3428.14 92.78 656.03 98.99 559.04 59096 10.26 OSF1.50 ass 8400.00 4063.72 2008.97 294428 6735.95 367118 194628 3421.61 95.86 621.19 95.81 525.57 557.04 9.69 OSF1.50 one 8450.00 4064.62 197972 2984.82 6715.12 3666.89 192686 341541 96.66 588.55 94.03 494.52 52545 9.49 OSF1.50 0. 8500.00 4066.29 195049 3025.35 6226.09 366299 1909.19 3409.52 101.07 558.52 92.20 468.32 498.85 9.19 OSFI.50 ens 8550.00 4068.09 1921.25 3065.87 6678.49 3659.38 1892.91 3403.88 103.16 531.13 90.18 440.95 47060 8.94 OSF1.50 Pass 8600.00 4069.98 1892.02 3106.40 6662.14 365603 1877.84 3398.49 105.13 508.74 8794 418.81 447.71 8.74 OSF1.50 Pass 8650.00 4071.67 1862.79 3146.92 664691 3652.92 1863.88 3393.33 106.99 485.87 8556 400.32 428.43 862 OSFI.50 Pass 8700.00 4073.46 1833.55 3187.45 6632.70 3650.01 1850.85 3388.39 108.74 469.03 83.13 385.90 41320 0 OSFI.50 Pass 6750.00 4075.26 180432 3227.97 6619.40 364730 1838.72 3383.67 110.39 456.70 80.85 375.84 40239 8.58 OSF1.50 Pass 8800.00 4077.05 1775.09 3268.50 6606694 3644.76 1827.39 3379.15 111.94 449.28 78.92 370.36 396.26 8.85 OSFI.50 Pass 8850.00 4078.84 1745.86 3309.02 6595.24 3642.38 181678 3374.83 113.4011 77271 369.491 394.941 8.78 OSFI.50 Pass 8900.00 4080.49 1716.82 3349.55 658421 3640.14 1806.80 3370.68 114.78 449.99 76.93 37305 398.29 8.89 OSF1.50 Pass 8950.00 4081.35 1687.38 3390.10 6573.65 363800 1797.28 3386.65 116.13 457.37 75.38 38201 406.72 9.23 OSF1.50. Pass 9000.00 4081.72 1858.14 3430.65 6563.59 363596 1788.24 3382.75 117.38 489.30 7684 392.66 417.80 9.31 OSF1.50 Pass 9050.00 4082.10 1628.89 3471.21 655409 363404 1779.72 335901 118.56 485.90 78.37 407.53 433.24 942 OSF1.50 Pass 9100.00 4082.48 1599.65 3511.76 6545.09 3632.22 1771.67 335542 119.68 506.72 8035 426.38 452.74 9.58 OSF1.50 Pass 9150.00 4082.85 1570.41 355231 6536.56 3630.49 1764.05 3351.86 120.73 531.28 8241 448.87 475.93 9.79 OSF1.50 Pass 9200.00 4083.23 1541.16 359287 6528.46 3628.86 1758.84 3348.68 12173 559.11 84.42 474.68 502.42 10.06 OSF150 Pass 9250.00 4083.60 151192 363342 6520.76 3627 31 1750.00 3345.50 122.68 58974 88.30 503.43 531.79 10.38 06E1.50 Pass 9300.00 4083.98 148267 3673.98 651343 362583 1743.51 334245 123.57 622.77 88.02 534.75 563.88 10.74 OSF1.50 Pass 9350.00 4084.36 1453.43 3714.53 6506.45 362443 1737.33 3339.52 124.42 65785 89.56 568.29 597.74 11.15 OSF1.50 Pass 9400.00 408497 142418 3755.08 6499.83 362309 1731.48 3338.71 125.26 89484 90.91 603.93 633.83 11.60 OSF1.50 Pass 9450.00 4085.75 139493 3795.62 6493.52 3621.83 1725.92 3334.01 126.03 73340 92.11 64129 671.58 12.08 OSF1.50 Pass 950.00 4086.53 136568 3836.16 6487.49 3620.62 172062 3331.41 126.76 77320 93.16 680.04 710.68 12.60 OSF1.50 Pass 9550.00 4087.31 133642 3878.71 8481.72 3619.46 1715.56 3328.90 127.45 814.07 94.09 719.98 75094 13.13 OSF1.50 Pass 9600.00 4088.08 1307.17 3817.25 6476.20 3618.36 1710.71 3326.48 128.11 855.88 9491 760.95 792.18 13.68 OSF1.50 Pass 9850.80 4088.86 1277.92 8957.79 647091 3617.00 1706.08 3324.15 128.75 898.44 9563 802.61 83428 1426 OSF1.50 Pass 9700.00 4089.64 1248.66 3998.33 6465.83 3616.28 1701.64 3321.93 129.35 941.71 96.27 845.44 877.12 14.84 OSF1.50 Pass 9750.00 409042 121941 4038.87 6460.95 3615.31 1697.39 3319.72 129.92 985.58 9884 888.74 920.81 15.44 OSF1.50 Pass 9800.00 4091.19 1190.16 4079.42 6456.27 3814.37 1693.31 3317.62 130.48 1029.98 9735 832.63 96467 16.05 OSF1.50 Pass 9850.00 4091.80 1160.90 4119.96 6451.75 3613.47 1889.38 3315.58 130.92 1074.80 9780 977.00 1009.19 16.67 OSF1.50 Pass 9900.00 4091.88 1131.65 4180.51 6447.32 3612.59 169553 331357 13122 1119.73 98.22 1021.51 1053.84 17.30 OSFI.50 Pass 9950.00 4091.11 110240 4201.05 6442.96 361172 1681.75 3311.58 131.60 1164.74 98.61 1066.12 1098.59 17.92 OSFI.50 Pass 10000.00 409023 1073.15 4241.60 6438.74 3610.88 187810 3309.65 132.05 1210.06 96.96 1111.10 1143.68 18.55 OSF1.50 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 21 of 24 Trajectory.SP04-SE7L1(73)9s.S115-N8(P1) Minimum Allowable Traveling Cylinder Allowable Deviaton from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azle Ct-Ct Distance Seperation Reference Clearance OSF Rule Status (ft) (9) _ (ft) (ft) (ft) (R) (ft) (ft) (') (ft) (ft) (ft) (ft) 0050.00 4089.35 104391 428214 6434.68 3610.07 167459 3307.78 3249 125572 9928 115644 1189.12 1919 OSF1.50 Pass 0100.00 4088.47 101466 4322.68 6430.76 3609.29 1671.20 330597 32.91 130168 99.58 120210 1234.89 19.83 OSF1.50 Pass 0150.00 4087.60 985.41 4383.23 6426.98 3608.54 166793 3304.21 33.31 1347.91 99.84 1248.06 1280.94 20.48 OSF1.50 Pass 0200.00 408672 956.17 4403.77 6423.32 3607.82 1664.78 3302.50 3370 139438 100.09 1294.29 1327.24 21.14 OSF1.50 Pass 0250.00 4085.84 928.92 444432 6419.79 3607.12 1661.74 330085 34.07 1441.07 100.31 134078 1373.78 21.80 OSF1.50 Pass 0300.00 4084.96 897.67 448486 6416.37 3606.44 165880 329924 3443 1487.96 100.51 138744 1420.54 22.46 OSF1.50 Pass 0350.00 4084.20 868.42 4525.41 6413.08 360579 1655.97 329768 3501 1535.07 100.70 143437 146753 23.13 OSF1.50 Pass 0400.00 4084.19 839.17 4565.96 6409.97 360517 1653.31 3296.20 35.74 1582.58 100.87 1481.71 151492 23.81 OSF1.50 Pass 0450.00 4084.44 809.92 4606.51 6406.98 3604.58 1650.74 3294.78 36.07 1630.30 101.02 1529.28 1562.54 24.49 OSF1.50 Pass 0500.00 4084.69 780.67 464706 6404.08 3604.01 1648.27 3293.40 36.39 1678.15 101.17 1578.98 1610.29 25.17 OSF1.50 Pass 0550.00 4084.95 751.42 4687.61 6401.27 3603.45 1645.88 3292.06 36.70 1726.10 101.30 1624.80 1658.16 25.85 OSF1.50 Pass 0600.00 408520 722.17 4728.16 6398.55 360291 1643.54 3290.75 36.99 1774.17 101.43 1672.74 1706.14 26.54 OSF1.50 Pass 0650.00 4085.45 69291 4768.71 6395.91 360239 1641.28 3289.47 37.28 1822.33 101.56 1720.78 1754.22 27.23 OSF1.50 Pass 0700.00 4085.70 663.66 4809.26 6393.34 360186 1639.09 3288.23 37.56 1870.57 101.66 1768.92 1802.39 27.92 OSF1.50 Pass 0750.00 4085.95 63441 484981 6390.85 3601.39 1636.97 3287.02 37.83 1918.91 101.77 1817.14 1850.65 28.61 OSF1.50 Pass 0800.00 4086.20 605.16 489036 6388.43 3600.91 1534.90 3285.85 38.09 1967.31 101.87 1865.45 1899.00 29.30 OSF1.50 Pass 0850.00 408645 575.91 4930.91 638607 360045 1632.90 328470 38.30 2015.79 101.96 1913.83 194741 30.00 OSF1.50 Pass 0900.00 4086.44 54666 4971.46 6383.76 3599.99 1630.94 3283.57 38.11 208428 102.05 1962.23 1995.84 30.89 OSF1.50 Pass 0950.00 4086.10 517.41 5012.01 6381.48 3599.54 1629.00 328245 38.19 211275 102.14 2010.61 2044.25 31.39 5SF7.50 Pass 1000.00 4085.72 488.16 5052.56 6379.26 3599.11 1627.11 3281.36 38.42 2161.28 102.22 2059.06 2092.73 32.08 OSF1.50 Pass 1050.00 4085.35 458.91 5093.11 6377.10 3598.68 1625.28 3280.30 38.64 2209.87 102.30 2107.57 2141.26 3278 OSF1.50 Pass 1100.00 4084.98 429.66 5133.66 637499 3598.27 1623.50 327926 38.85 2258.52 10238 2156.14 2189.86 33.47 0571.50 Pass 1150.00 408461 400.41 5174.21 6372.94 3597.86 1621.76 3278.25 39.06 2307.22 102.45 2204.77 2238.51 34.17 0071.50 Pass 1200.00 408424 371.16 5214.76 6370.94 3597.47 1620.07 3277.26 3926 2355.98 102.52 2253.45 2287.22 34.87 OSF1.50 Pass 1250.00 4083.87 341.92 5255.31 6368.99 359709 1618.42 3276.29 39.45 2404.77 102.59 230218 2335.97 35.57 OSF1.50 Pass 1300.00 4083.49 312.67 529586 6367.09 359672 1816.81 3275.35 3964 2453.62 102.65 2350.96 2384.77 38.27 OSF1.50 Pass 1350.00 4083.15 283.42 533641 636524 3596.35 1615.25 3274.42 4004 2502.51 102.72 2399.80 243363 38.97 OSF1.50 Pass 1400.00 408316 254.17 537696 6363.46 359600 1613.75 3273.53 40.85 255151 102.77 2448.74 2482.59 3767 OSF1.50 Pass 1450.00 4083.60 224.92 541751 6361.76 3595.67 1612.31 3272.68 4173 2600.62 102.82 2497.80 2531.67 38.38 0071.50 Pass 1500.00 4084.30 195.67 545806 6360.11 359535 1610.93 3271.86 41.98 2649.81 102.87 2546.94 2580.82 39.08 OSF1.50 Pass 1550.00 4085.00 168.42 5498.61 6358.51 359503 1609.57 3271.05 4215 269903 102.93 2596.11 2830.01 39.79 0071.50 Pass 1600.00 4085.70 13717 5539.15 6358.94 359472 1608.25 3270.26 4232 2748.27 102.97 2645.30 2679.22 40.50 OSF1.50 Pass 1650.00 4086.40 107.92 557970 6355.40 359442 1606.96 3289.49 4248 279754 103.02 2694.51 2728.45 41.20 OSF1.50 Pass 1700.00 4087.10 78.67 5620.24 6353.91 3594.13 1605.70 3268.73 4264 284683 103.07 2743.76 2777.71 41.91 OSF1.50 Pass 1750.00 4087.80 49.42 5660.79 6352.44 359384 1804.47 3267.99 4200 289614 103.12 2793.03 2826.99 42.62 OSF1.50 Pass 1800.00 4088.50 2017 5701.34 6351.01 359356 1603.27 3267.27 4295 294518 103.16 2842.32 2876.30 43.32 OSF1.50 Pass 1850.00 4089.18 -9.08 5741.88 6349.60 359329 1602.09 3266.56 4261 299483 103.20 2881.63 2925.82 44.03 OSF1.50 Pass 1900.00 408952 38.33 5782.43 6348.21 359301 1600.92 3185.85 4209 304415 103.25 2940.90 2974.91 44.74 OSF1.50 Pass 1950.00 4089.56 -67.58 5822.98 6346.82 359274 1599.76 3265.14 4204 309344 103.29 2990.15 3024.17 45.44 OSF1.50 Pass 2000.00 4089.59 -96.83 5863.53 634546 359248 1598.62 3264.45 42.18 3142.75 103.33 3039.42 3073.46 46.15 OSF1.50 Pass 2050.00 408962 -126.08 5904.09 634413 3592.22 1597.50 326378 42.31 3192.08 103.37 3088.71 3122.76 46.88 0071.50 Pass 2100.00 4089.05 -155.33 594464 6342.83 3591.96 1596.41 3263.11 42.44 3241.43 103.41 3138.02 3172.08 47.56 OSF1.50 Pass 2150.00 408968 -18458 5985.19 634155 359171 1595.34 3262.48 42.56 3290.80 103.45 3187.35 3221.42 48.27 OSF1.50 Pass 2210.00 408971 -213.84 602574 6340.30 359147 159430 3261.82 4268 3340.18 103.49 323670 3270.78 48.98 OSF1.50 Pass 2250.00 4089.74 -243.09 6066.29 633908 3591.23 1593.27 3261.19 42.80 338959 103.53 3286.06 3320.16 49.68 OSF1.50 Pass 230000 408977 -272.34 610684 6337.88 3591.00 1592.27 326058 4292 3439.00 103.56 333544 3369.55 50.38 OSF1.50 Pass 235000 4089.84 -30159 614739 6338.71 359077 1591.29 3259.97 43.49 348844 103.60 3384.85 3418.97 51.10 OSF1.50 Pass 2400.00 4090.27 -33084 6187.93 633558 359055 1590.35 3259.39 4457 3537.95 103.63 3434.32 3468.45 51.60 OSF1.50 Pass 245000 4090.87 -360.10 6228.48 6334.48 3590.33 1588.43 3258.83 44.60 3587.48 10366 3483.82 3517.97 52.51 OSF1.50 Pass 2500.00 4091.46 -38935 6269.02 6333.40 3590.12 1588.53 3258.27 44.80 3637.03 103.70 3533.33 356749 53.22 OSF1.50 Pass 2550.00 4092.05 -418.61' 6309.57 6332.34 3589.92 158765 325773 44.90 368659 103.73 3582.86 3617.03 53.93 OSF1.50 Pass 2600.00 4092.65 -447.66 6350.11 6331.30 3589.71 1586.78 3257.19 45.01 3736.16 103.76 3632.40 3666.58 54.64 OSF1.50 Pass 2650.00 409124 -477.12 639065 6330.29 358952 158593 3256.66 45.11 3785.74 103.79 3681.95 3716.14 55.35 OSF1.50 Pass 270000 4093.83 -50637 643120 632929 3589.32 1585.10 3256.15 45.21 3835.33 103.82 3731.51 3765.71 56.05 OSF1.50 Pass 2750.00 409442 -535.63 6471.74 632831 3589.13 1584.28 3255.64 4531 3884.93 103.85 3781.07 3815.28 56.76 OSF1.50 Pass 2800.00 4095.02 -564.88 8512.29 6327.34 358894 1583.48 3255.14 45.41 393454 103.88 3830.65 3884.87 57.47 OSF1.50 Pass 2850.00 4095.59 594.14 6552.83 6326.40 3588.76 1582.69 3254.65 44.97 398415 103.91 3880.24 3914.47 58.18 OSF1.50 Pass 2900.00 4095.59 -623.39 6593.38 6325.43 358857 1581.89 3254.15 42.67 403371 103.94 3929.77 3964.01 58.89 OSF1.50 Pass 2950.00 4094.85 -652.63 663393 6324.45 3588.38 1581.08 3253.64 41.89 4083.18 103.97 3979.20 4013.45 59.59 0871.50 Pass 3000.00 4094.02 -881.87 667448 6323.48 358819 1580.27 3253.13 4197 413265 104.00 4028.64 4062.90 60.30 OSF1.50 Pass 3050.00 409120 -71111 6715.03 6322.52 3588.00 1579.47 3252.63 4205 418213 104.03 4078.10 4112.37 61.00 OSF1.50 Pass 3100.00 4092.37 -740.35 6755.58 8321.59 358782 1578.70 325214 42.13 4231.62 104.06 4127.56 4161.84 61.70 OSF1.50 Pass 3150.00 4091.55 -76959 6796.13 6320.66 3587.84 1577.93 3251.66 42.21 4281.13 104.09 4177.03 4211.32 62.41 OSF1.50 Pass 3200.00 4090.73 -798.83 6836.68 631976 3587.47 1577.18 3251.19 42.29 4330.64 104.12 4226.52 4260.82 63.11 OSF1.50 Pass 3250.00 4089.90 -828.07 687723 6318.87 358729 1576.44 3250.72 42.36 438017 104.15 4278.02 4310.33 63.82 OSF1.50 Pass 3300.00 4089.08 857.31 6917.78 8317.99 3587.12 1575.71 3250.26 4244 442970 104.18 4325.52 4359.84 84.52 0071.50 Pass 3350.00 4088.25 -886.56 6958.33 6317.13 3586.96 1575.00 3249.81 42.51 447925 104.20 4375.04 4409.37 65.23 OSF1.50 Pass 3400.00 4087.64 -915.80 6998.88 8316.29 358679 1574.30 3249.37 43.60 4528.83 104.23 4424.60 4458.93 65.93 OSF1.50 Pass 345000 4087.15 845.06 7039.42 631547 358663 1573.02 3248.94 43.67 457843 104.28 4474.17 4508.52 66.64 OSF1.50 Pass 3500.00 4086.87 874.31 7079.97 6314.60 3586.48 1572.95 3248.52 43.74 4628.04 104.28 4523.76 4556.11 67.34 OSF1.50 Pass 355000 408618 -1003.57 712051 6313.87 358632 1572.29 3248.10 43.81 4677.66 104.31 4573.35 460771 68.05 OSF1.50 Pass 3600.00 4085.70 -1032.82 7161.06 6313.08 3586.17 1571.65 3247.69 43.88 472729 104.34 4622.95 4657.32 68.75 OSF1.50 Pass 3850.00 4085.21 -1062.08 7201.60 6312.32 3586.02 1571.01 3247.28 4394 477692 104.36 4672.56 4706.94 60.46 OSF1.50 Pass 3700.00 4084.73 -1091.34 7242.15 631156 358587 1570.38 3246.88 44.01 4826.56 104.39 4722.18 4756.57 70.16 OSF1.50 Pass 3750.00 4084.24 -1120.59 728269 6310.81 3585.73 1569.77 3246.49 44.07 487621 104.41 4771.80 4806.20 7087 OSF1.50 Pass End of remits • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 22 of 24 Field: Nikarchug Well: 5114-NO Structure: Spy Island Borehole: 5114-N6 Slot SP14 Trajectory 5114-y'6 Client: Eni Petroleum Type: Del Survey Coordinate System: 144027 Alaska State Plane,Zone 04,US Feet North Reference: True Grld Convergence Angle: 0.08982660' Grid Scale Factor: 0.999900153 Magnetic Declination: 19.561° Magnetic Declination Date: December 19 2013 Magnetic Model: BOOM 2013 Reference Point Jaormina E8S!(-g Flevalion Structure Lino. Slot cane. 6053646 720(11US) 511614 150(f9US) 53 930(ft)MSL 0.000(ft)(1 sigma) 0.000(ft)(1 sigma) Tralectory Error Model:ISCWSAO 3-0 95.000%Confidence 2.7955 sigma Survey'no Pros'As Drilled Description MD From(ft) MD To(ft) EOU Freq Survey Tool Type Hole Um(M) Casing Dlameler(In) Borehole I Survey 0 000 40830 1198.425 SLB NSG+55MOT-Oeplh Only-No Global 16.000 13.375 5114-N810114-N6 40.830 40.830 Act-Stns SLB_NSG+SSHOT-Depth Only-No Global 16.000 13.375 S114-N61 S114-N6 40.830 920910 Act-Stns SLB NSG+SSHOT-No Globe 18.000 13.375 5114-N8/S114N6 920.910 2614360 ActSt n SLB MNtO+GMAG-No Globs 18.000 13.375 SI74N61 S114-N6 2614.360 2711 740 ActSors SLB_MWD-INC_ONLY_FILLER-No Globe 12.250 9.625 S114-N6 I S114-N6 2711 740 6999 930 Act-Stns SLB_MWD+GMAG-No Globe 12.250 9.625 SI14N81 S114-N6 6999.930 14701520 Act-Sins SLB_MWO+GMAG-No Globs 8.750 5.500 S114-N6/S114-N6 14701.520 14770.000 Act-Stns SLB BLIND+TREND-No Globe 8.750 5.500 S114-N6/SI14-N6 Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference WI Reference NS Reference EW Offset MD Offset WI Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (ft) (R) (ft) (ft) (ft) (R) (R) _ (`) (ft) (11) (ft) (ft) All local minima indicated. Results filtered:Depth 710000 ft<=MD<=17377.37 R Results filtered:Ct-Ct separation<=1500.00 ft Results highlighted:Ct-Ct separation<=1320.00 R :10000 4055.27 279255 1911.91 6445.04 3999.90 2042.15 1115.49 256.31 93.011 1002641 t 1706F1.50 Pass 7150.00 4057.55 2768.43 195565 6419.09 399775 2023.23 1133.12 206.80 111151 92.79 1018.72 - 18.1 OSF1.50 Pass 720000 4060.62 2743.75 199902 6393.44 399551 2004.21 1150.19 208.14 112769 9270 1034.99 065.53 18.44 OSF1.50 Pass 725000 4063.58 271777 204184 8368.35 3993.23 1985.30 1166.62 209.63 114337 9450 1048.87 080.01 18.34 05E1.50 Pass 7300.00 4066.08 2690.36 2083.37 6344.61 399096 1967.27 1181.48 211.17 1158.41 9629 106212 093.86 18.23 OSF7.50 Pass 7350.00 4068.10 2661.54 2124.18 8321.32 398862 1948.98 1198.03 21274 1172.83 10406 1068.78 103.10 17.07 OSF1.50 Pass 7400.00 4009.65 2631.36 2164.01 6297.88 398616 1930.45 1210.16 214.35 1186.63 111.90 1074.73 111.67 16.05 OSF1.50 Pass 7450.00 4070.73 2599.95 2202.82 627315 3983.45 1910.59 1224.66 215.98 1199.78 12226 1077.52 11792 14.84 OSF1.50 Pass 7500.00 4071.33 2567.05 2240.55 6244.61 3980.22 188741 1241.00 217.63 121215 128.64 1082.50 125 OSF1.50 Pass 7550.00 4071.46 2533.00 2277.16 6216.05 397688 1863.97 1258.97 219.31 1223.66 12908 1094.58 137.25 14. OSF1.50 Pass 7090.00 4071.11 2497.74 2312.60 6187.47 3973.45 1840.26 1272.55 221.03 123431 128.49 1105.82 14829 14.52 OSF1.50 Pass 7650.00 4070.44 2461.82 234748 6162.77 3970.43 1819.54 1285.65 220.00 1245.04 127.99 1117.04 159.35 1470 OSF1.50 Pass 7700.00 4069.83 2427.23 2383.48 613870 3967.46 1799.11 1298.03 217.86 1258.27 127.50 1130.77 172.91 1492 OSF1.50 Pass 7750.00 4069.31 2393.82 2420.67 6115.15 396453 1778.89 1309.74 21571 1274.08 127.14 1148.94 18896 15.15 OSF1.50 Pass 7800.00 4068.88 2361.73 245901 6092.20 396166 1758.99 132079 213.57 129241 128.78 116563 207.53 15.41 08F1.50 Pass 7850.00 4068.53 2330.99 2498.44 6070.16 3958.90 1739.68 133106 21144 1313.18 128.57 1186.62 228.45 15.68 OSF1.50 Pass 7800.00 4068.16 2301.51 2538.82 804881 3956.23 1720.80 1340.86 210.05 1338.16 128.39 1279.77 251.55 1998 OSF1.60 Pass 7950.00 4067.66 2272.25 257936 602790 395362 1702.14 1349.75 209.98 136014 128.33 1233.81 275.58 16.27 OSF1.50 Pass 8000.00 4067.18 2243.00 261991 6007.37 395106 1683.68 1358.36 209.92 1364.86 128.25 1258.60 300.33 18.58 OSF1.50 Pass 8050.00 4066.67 221375 2880.45 598466 3948.23 1831.11 1367.54 209.85 141027 126.34 1283.92 325.68 16.87 OSF1.50 Pass 8100.00 4066.17 218409 2701.00 5909.88 394523 1841.45 1376.87 209.78 1436.28 126.44 1309.92 351.61 17.17 OSF1.50 Pass 815000 4065.68 2155.24 2741.55 593749 394226 1620.02 1385.77 209.71 146282 126.88 1336.15 378.02 17.46 OSF1.50 Pass 8200.00 4065.18 2125.98 278209 591448 3939.31 1598.82 1394.24 209.64 1489.92 1211.87 136306 404.99 17.75 OSF1.50 Pass 8250.00 406468 209673 2822.64 589123 393627 1577.32 1402.53 20957 151756 127.20 1390.36 432.40 18.03 OSF1.50 Pass 830000 4064.19 206748 2863.18 586803 3933.09 1555.79 1410.55 209.50 154569 127.52 1418.17 460.32 18.32 OSF1.50 Pass 8350.00 4063.70 2038.22 290373 5845.23 3929.70 1534.57 1418.19 219.49 157431 127.92 1446.40 488.88 18.60 OSF1.50 Pass 6400.00 4063.72 2008.97 2944.28 5822.86 0926.22 1513.70 1425.44 210.11 160305 128.28 1475.17 517.58 1989 OSF1.50 Pass 8450.00 4064.82 979.72 2984.82 5802.98 392300 1495.10 143168 210.73 1633.14 128.61 1504.53 547.05 1919 OSF1.50 Pass 8500.00 4066.29 950.49 3025.35 578508 392007 1478.28 143707 211.02 1663.42 128.91 1534.51 577.13 19.50' OSF1.50 Pass 8560.00 4068.09 92125 3085.87 5767.54 3917.16 146174 1442.14 210.91 1094.24 12932 1564.92 607.67 19.80 OSF1.50 Pass 8800.00 4009.88 892.02 3106.40 5750.35 391430 1445.48 1448.90 21081 1725.56 129.71 1595.85 63873 20.11 OSF1.50 Pass 8650.09 407187 86279 3146.92 5733.51 3911.47 1429.49 1451.36 210.71 175737 130.16 1627.21 670.24 27.41 OSF1.50 Pass 8700.00 407346 833.55 3187.45 5718.08 3908.53 1412.88 145577 210.60 1789.86 130.62 1659.04 702.23 21.71 OSF150 Pass 8750.00 4075.26 804.32 322797 5695.09 390492 1392.85 1480.88 210.48 1822.35 131.26 169109 734.48 21.98 OSF1.50 Pass 9800.00 407705 775.09 3268.50 5674.46 390128 1373.13 1465.72 21036 1855.38 131.88 1723.50 767.11 21.26 OSF1.50 Pass 8850.00 4078.84 745.86 3309.02 5654.17 3897.64 1353.70 1470.32 210.24 1888.77 132.55 1756.22 80005 21.54 OSF1.50 Pass 8900.00 4080.49 71682 3349.55 5634.27 3893.97 1334.56 1474.67 209.59 1922.48 133.22 1789.26 833.31 21.81 OSF1.50 Pass 6950.00 4081.35 687.38 3390.10 5617.63 3890.68 1318.65 1478.15 208.59 1958.47 111.01 1845.47 882.11 2888 OSF1.50 Pass 9000.00 4081.72 658.14 3430.65 5803.21 3888.15 1304.80 1481.01 208.48 1990.83 110.50 1880.33 916.81 27.27 OSF1.50 Pass 905000 4082.10 628.89 3471.21 5589.11 3885.45 1291.21 1483.66 20842 2025.59 110.02 1915.57 95189 27.87 OSF1.50 Pass 9100.00 408248 599.65 3511.76 5575.29 388277 1277.88 1486.12 20836 2160.74 109.54 195120 987.36 28.48 OSF1.50 Pass 9150.00 4082.85 570.41 3552.31 5561.77 388012 1284.81 148838 208.30 2196.26 108.08 1987.18 2023.18 28.10 OSF1.50 Pass 9200.00 4093.23 54116 359287 554853 387751 1252.00 149047 208.24 213214 108.63 202351 205937 2972 OSF1.50 Pass 925000 4083.60 511.92 363342 5535.57 387492 1239.45 149239 208.19 2168.37 108.19 2060.18 2095.89 30.35 00F1.50 Pass 9300.00 4083.98 482.67 3673.98 552079 387193 1225.12 1494.43 208.12 220493 107.81 2097.12 2132.70 30.97 OSF1.50 Pass 935000 408436 453.43 3714.53 550585 3868.69 1210.82 1496.38 208.09 224178 10745 213434 2169.80 31.60 OSF1.50 Pass 9400.00 4084.97 424.18 375508 5491.20 386587 1196.40 1498.17 208.52 2278.94 107.05 2171.88 2207.21 32.24 05F1.50 Pass 945000 4085.75 394.93 3795.82 5476.64 386209 1182.45 1499.81 208.45 2316.37 10671 2219.66 2244.88 32.87 OSF1.50 Pass 9500.00 4086.53 365.68 383818 546274 385993 1165.74 1501.30 208.39 2354.08 106.38 224771 2282.81 33.52 OSF1.50 Pass 9550.00 4087.31 336.42 3876.71 5448.90 3857.00 1155.29 1502.87 218.32 2092.05 106.06 225599 2321.99 34.18 OSF1.50 Pass 9600.00 4088.08 307.17 3917.25 5438.17 3854.29 114291 1503.83 208.26 2430.27 105.73 2324.54 2359.43 34.82 OSF1.50 Pass 9650.00 4088.66 277.92 6957.79 5425.31 385195 1132.33 1504.73 208.21 2468.77 105.40 2363.37 2398.14 3548 OSF1.50 Pass 9700.00 4089.64 248.86 3698.33 5414.67 384966 1121.97 1505.52 208.16 2507.54 105.08 2402.46 2437.13 3615 OSF1.50 Pass 9750.00 4090.42 219.41 4038.87 540424 384740 1111.82 150621 208.12 2546.57 104.77 2441.79 2476.38 38.82 OSF1.50 Pass 9500.09 4091.19 180.18 407942 5394.03 3845.17 1101.87 1508.81 208.07 2585.85 104.47 248138 2515.85 37.50 OSF1.50 Pass 9850.00 409190 160.90 4119.98 5384.02 384298 1092.12 1507.31 207.50 2625.38 104.18 2521.20 2555.57 38.18 03F1.50 Pass 9900.00 4091.88 131.65 4160.51 5374.16 3840.61 1082.51 1507.73 208.17 2685.08 103.90 2561.18 2595.45 38.86 OSF1.50 Pass 9950.00 4091.11 102.40 4201.05 5364.45 383866 1073.04 1508.08 205.51 2704.94 103.64 2691.30 2635.49 39.54 OSF1.50 Pass 10000.06 409023 073.15 4241.60 5354.92 3838.55 1063.76 1508.34 206.49 2745.02 103.39 2641.63 2675.74 4023 05F1.50 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 23 of 24 Trajectory:SP04SE7L1(P3)Vs.5114-66 Minimum Allowable Traveling Cylinder Allowable Deviation from 6011-EOU Controlling Reference MD Reference IVO Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Acim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°) (ft) (ft) (0) (ft) 0050.00 4089.35 1043.91 4282.14 5345.43 3834.43 1054.50 1508.53 205.46 2785.32 103.15 268217 2716.19 40.91 OSF1.50 Pass 0100.00 4088.47 101466 4322.68 5334.83 3832.07 1044.18 1508.88 205.44 282582 102.95 2722.87 2756.83 41.59 OSF1.50 Pass 0150.00 4087.60 985.41 4363.23 5324.43 3829.75 1034.04 1508.75 205.42 2866.52 102.78 2763.75 279765 42.27 OSF1.50 Pass 0200.00 4086.72 956.17 440377 5314.22 3827.49 1024.08 1508.75 205.39 2907.40 102.58 2804.82 2638.66 42.95 OSF1.50 Pass 0250.00 4085.84 926.92 444432 5304.18 3825.26 101429 1508.88 205.37 2948.47 102.40 2846.06 2879.84 43.63 OSF1.50 Pass 0300.00 4084.96 89767 4484.86 5294.33 3823.09 11704.89 1508.58 205.35 2989.71 102.23 2887.48 2921.20 44.31 OSF1.50 Pass 035000 408420 868.42 4525.41 5284.86 3820.95 995.26 1508.38 206.08 3031.14 102.05 2929.10 2962.78 45.01 OSF1.50 Pass 0400.00 4084.19 539.17 4565.96 5275.22 3818.88 986.05 1508.15 207.21 3072.81 . 10184 2970.97 3004.56 45.72 OSF1.50 Pass 0450.00 4084.44 809.92 4806.51 5285.96 3816.84 977.02 1507.86 207.18 3114.66 101.88 3012.98 3048.52 46.42 OSF1.50 Pass 0500.00 408469 780.67 464706 5256.86 381485 968.15 1507.53 207.15 3156.67 101.53 3055.15 3088.63 47.12 OSF1.50 Pass 05000 4084.95 75142 4687.61 5248.20 3812.95 959.70 1507.17 207.12 3198.84 101.37 3097.47 3130.91 47.82 OSF1.50 Pass • 0600.00 4085.20 722.17 472816 5239.98 3811.14 951.59 1506.77 20709 3241.16 101.20 3139.96 3173.34 48.54 OSF1.50 Pass 0850.00 408545 692.91 4768.71 5231.70 3809.35 943.62 1506.33 207.07 3283.63 101.04 3182.59 3215,91 48.25 OSF1.50 Pass • 0700.00 4085.70 683.66 4809.26 5223.67 3807.60 935.80 1505.85 207.04 3328.24 100.88 3225.36 3258.63 49.97 OSF1.50 Pass 0750.00 4085.95 634.41 4849.81 5215.78 3805.87 928.12 150534 207.02 3369.00 100.73 3288.26 3301,48 5069 OSF1.50 Pass • 0805.00 4086.20 805.16 4890.36 5208.03 3804.18 920.57 1504.80 207.00 3411.89 100.59 3311.30 3344.48 51.41 OSF1.50 Pass I 0850.00 408645 575.91 4930.91 5200.41 380252 91116 1504,23 206.90 3454.92 100.44 3354.47 3387.60 52.13 OSF1.50 Pass 080.00 4086.44 54666 4971.48 5192.90 3800.89 905.88 1503.83 206.03 3498.06 100.31 3397.75 3430.83 52.86 06F1.50 Pass •i 0950.00 4086.10 517.41 5012.01 5185.51 3799.28 898.67 1503.00 205.73 3541.30 10.18 3441.11 3474.15 53.58 OSF1.50 Pass 1000.00 4085.72 488.16 5052.56 5178.23 3797.70 891.0 1502.34 205.72 3584.66 10.06 3481.0 3517.0 54.30 OSF1.50 Pass 1050.0 408535 458.91 5093.11 5171.06 3796.14 884.85 1501.66 205.70 3628.14 99.94 3528.20 3561.16 55.03 OSF1.50 Pass 110.0 4084.98 429.66 5133.66 5164.06 3794.61 877.83 150.96 205.69 3671.74 9962 357192 3804.84 5575 OSF1.50 Pass 1150.0 408461 40.41 517421 5157.17 3793.12 871.14 1500.23 205.68 3715.46 99.71 3615.75 3648.63 56.48 OSF1.50 Pass 120.05 4084.24 371.16 5214.76 5150.43 3791.65 864.61 1499.50 20.66 3759.29 99.60 3659.69 3692.53 57.21 OSF1.50 Pass 1250.00 4083.87 341.92 5255.31 5143.80 3790.20 858.19 1498.74 205.65 3803.23 99.50 370373 3736.54 57.94 OSF1.50 Pass 130.00 408319 312.67 5295.86 5137.28 3788.76 851.88 1497.97 205.64 3847.28 99.40 3747.88 378066 58.67 OSF1.50 Pass 1350.0 4083.15 283.42 5336.41 5130.68 3787.34 845.68 1497.19 205.97 3891.44 99.29 379215 3824.89 59.41 OSF1.50 Pass 140.0 4083.16 254.17 537696 5124.60 3785.95 839.61 1498.40 206.89 3935.72 99.14 3836.58 3869.27 60.18 OSF1.50 Pass 1450.00 408360 224.82 5417.51 5118.45 3784.58 833.67 1495.59 207.83 3980.13 98.97 3881.16 3913.80 60.96 OSF1.50 Pass 150.00 408430 195.67 5458.06 5112.41 3783.22 827.84 1494.78 207.0 4024.68 98.84 392582 3958.41 81.73 OSF1.50 Pass 1550.05 408500 168.42 5498.61 510.48 3781.89 82212 1493.95 207.88 4069.28 98.76 397053 4003.09 62.47 OSF1.50 Pass 1800.05 408570 137.17 5539.15 510.64 3780.57 816.49 1493.12 207.86 411400 9867 401533 4047.86 63.21 OSF150 Pass 1650.00 4086.40 107.92 5579.70 509189 3779.26 810.95 149228 207.84 4158.80 98.59 4060.21 4092.72 63.95 OSF1.50 Pass 1700.00 4087.10 78.87 5620.24 5089.23 3777.98 805.51 1491.43 207.82 4203.69 9851 410518 4137.66 64.70 06F1.50 Pass 1750.00 4087.80 4912 5660.79 5083.67 3776.71 80.17 1490.57 20780 4248.86 98.43 4150.23 4182.89 65.44 OSF1.50 Pass 1800.0 4088.50 20.17 570134 5078.19 3775.45 794.0 1489.71 207.78 429372 98.36 4195.37 4227.80 68.19 06F1.50 Pass i 1850.0 4089.18 -9.08 5741.88 507280 3774.21 789.73 1488.84 207.43 4338.86 98.28 424058 4272.98 66.93 OSF1.50 Pass I 190.0 408952 38.33 578243 5067.47 3772.96 784.82 1487.96 20.37 4384.06 9822 4285.84 4318.23 67.66 OSF1.50 Pass i 1950.0 4089.58 -67.58 5822.98 5062.42 3771.81 779.78 1487.11 206.13 4429.31 98.16 4331.16 4363.52 68.41 OSF1.50 Pass I 200.0 4089.59 -96.83 5863.53 5057.49 3770.87 775.06 1486.26 20.11 4474.64 98.10 4376.54 4408.89 89.15 OSF1.50 Pass 2050.0 4089.62 -126.0 590409 5052.84 3789.54 770.42 1485.41 20.10 4520.05 98.05 442200 4454.33 89.89 05F1.50 Pass 210.0 4089.65 -155.33 5944.64 5047.86 3768.44 765.85 1484.55 20.09 4565.53 98.0 4467.54 4489.85 70.63 OSF1.50 Pass 2150.0 4089.68 -184.58 5985.19 5043.16 3767.35 761.38 1483.69 206.08 4611.09 97.95 4513.14 4545.43 71.37 OSF1.50 Pass 2200.00 4089.71 -213.84 6025.74 5038.53 3766.28 756.93 1482.83 20.07 4656.71 97.90 4558.81 4591.09 72.12 OSF1.50 Pass ' 2250.0 4089.74 -243.09 6066.29 5033.96 3755.22 752.58 1481.97 20.06 4702.41 97.86 4604.55 4638.81 72.86 OSF1.50 Pass 230.0 4089.77 -272.34 8106.84 5029.47 3764.18 748.29 1481.10 20605 4748.17 87.82 4650.35 4682.60 73.60 OSF1.50 Pass 2360.0 4089.84 -301.59 614739 5025.04 3763.16 744.07 1480.24 206.54 4794.00 97.76 4696.24 4728.47 74.35 OSF1.50 Pass 240.0 4090.27 -330.84 8187.93 5020.70 3762.15 739.93 1479.37 207.51 4839.91 97.68 4742.24 4774.44 75.13 OSF1.50 Pass 2450.0 409087 30.10 6228.48 5016.42 3761.17 735.87 1478.51 20750 4885.90 97.64 4788.28 4820.45 7587 OSF1.50 Pass End of results • • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP04-SE5\SP04-SE5L1\SP04-SE7L1(P3) 3/5/2015 3:03 PM Page 24 of 24 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: is/, � S��'( — 1 PTD: �-o, y Development _Service _Exploratory Stratigraphic Test Non-Conventional FIELD: /(j�i��c..12� POOL: 14aifrch Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit J LATERAL No. ,215- Q2) , API No. 50-M „2353.7- - 6a - O O . (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(dX2XB) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 0 N � , , C) o , a) fl- , co 0 a (] y , C , L , d d O O ° ° N, E. Z �, : : 3, : : : : 0 : : , : c cm 0 O o o, El , d c. -0, , , °, , , �d , , , '� '� o : H' U' 'c, : s, : . , 3: : ci' CI. T , 3, o, , ti; , , , , �' rn , ' , , W _ O � , MO' C -o` T � Ly 3 NL v > C°, a , _ Z '3: �, , , ' C , , , . m �, '3: �' , , , E. , u eco • w p.. U) 115 01 ` c N LLLit) v; w, p �, W, c ::,'"I , H, , lL CT `? O' , G as , y co 7, 4 , 2 , 0 a Ed , r) D, w, N , 4; E c. , °, N a, cd. , d c. c co, U J a) c' O' N O y — N' _ w m' N UY co al �' a) F- : hUt , , , hill , , : 'EIHf °) g3: : a : : : : : irk : 4 1 I m Z a) �� �, N C, E' c, Q N� 'N, N , w. CO, N, , -° -°' ° : —' 1 in m c, 3 a, ° y d an a) a> N; , 5 0, al cs' =, , o 2, (a, d % a, �. , 3. 1 x 3OO 0.O ZN a) co aY coOoa- O. Nd O a0 C� N, ° Ea) N O = L • O0a � O xN, o, ° w C , o y0: , € ,_ N CO 0 E Z M. U. I=.� O, U � �� aCl) ° d co � 7� O0) N. , O _ Q cu Z ; 0 C Y. 00 o oit, = rn y d m ) Q ' N N x , ar m LU Q Z z U 0 0 O u) c, 0 ix0 Z' ' 2 t 2 2 • 2 w 0� c O. „ Q w : : : : . , , . . , , , , . J N' N, Cl) Cl) CO Cl)' Cl). Cl) CO C/). CO CO, N U) U) 0N, U) CO, 0 N• CO 0.< Q N, a) a), a), N, a), a), 0, a), a), a), a), ' <, <, <, <, <, < N, a), N, Q, a), Q. a), 0, a), co, a), o, <, a), N, Q, a z z, >-, }, }, }, }, }, >-, }, >-, >-, >-, >-, z, z, z, z, z, z, z }, }, }, z, >-, z, >-, }, >-, }, }, z, z, >-, >-, z, z, z, , a) N v to N T 0 0 u), , o, , T,) N, : : : : : : : E : 3, , , , , , , , , , , , , , , , , , , , • , , . . . . . E , o. , , , , , , , , , , , , , , , , 0. U Z, O O, C, N , X U -J E' ' '' o (o, a), N, N. a), , O. , 0 N g cc a. U d , Ii , C >°, •as, N. C, 0' u),' 1I .iI LO, C, !1I m.= ot4 v , , . CuP > 0 L ,,,5' E N ° oM ° ° NN 1 _ L , i N CC, ,.,0 3 00) , n , , 1_ , � ° E ° , oaE : ° Duc, m, v °10 , a' y; C C' 2' o' `' ` • Lom >, , , ' > O' a, y oco a) „,.,,(7Y EE _, vcE' ) o Ccy1= c o ` ea' dc aa aN t d C C yH Z Z4„ °, °, �, O , � O 0� 0, • 4- C p, ° O) 7Vp, S O; 0, V Q ajd C _a, O, j, N' o. T N�, O = rC, G N� ° °' C � NO ° -0' ' 8' ooa �, c , •« -'C, E� o Ofa. °� Nf, `� Q, lo, ONpN o, _, , ., o. ca) E Cd �; O, a3' ' 0Ea, . N, N 0 d d a) 'D, O , ! flHiiI -UUUflID >.'C v c yy '�, o, a m, 3. 3: 0,, �, U O ' C, , O, c. +C, °, �, >, °, N d 'O, O, O. () -E, 0 ° a) a ° c ¢ „, N, -O, E' N, (aEO, O) G O, ON, ,, a1 d ° ), (p - ' ' (a _ OTT ya, ON � EN oLON• c' (4 0C' qQ N O0a) N dTr0aO — Oa) ; ° , L. d 0 d d °) ' g. 0,. N N. d E. , d « fta). O) a' Op, , G ico ° O 0). G -° W N, U �. E. OC O, O, a) , a) O N y, a, . .C, dS S. 6N ( L' ; O o i 'a _, G N. -0' -in. .2. 0- a) y d 2S 2. d d N, vcoaa). a . C, .°, `. G OO' a) C' 6 RNd 0, wQ s, OVaT : Il O ., i, v. 'a 'a U. , C' (C, .C, L, L, -O, -C, u 'Ua), a), >, .00L, 3o, , co. , U, � _a C, (a. c, E O -0 O N 0 ONCC' 3Y CEa .N-U' O .N' f0' O ° LmG mC. N. 3' , Umcrm' oo.' o = o N' ' , o. a' O, ( c_ C, Nam, o°, ca U U O O U U U CO U OO � d EN C U U _J w G a, Q o, TY O, N. as a), G �, , C t F_ H H, N a) W C a a: a 0, D U EP 0, "S' .y, m G 'Fd (N") o ax c 'c a d o c' o ° 2' 2' 2 ( ° a `o c O O .c o o o V mz, a, , 0, „ , ), —, 0,, 0, 0, a, c.)„ a, a, U, u), 0, 000, a, _, d _, D; ogoo, 0 , „ a, D; n, co, Uo W °' N- 0 N M V' Cl) CD a0 O) O N M V Cl) (O N. ap O) O N M (l) (0 N- CO O) l� V N M V U) CO N. CO 0) N N N N N N N N N N M M M M M-C() M M M I— cr) LO U a`) c 'O-' (N .C'' (N 'O-'0 co ea ( V 0 tE u,.?LU (0 ,� M •C M M y E _d N' Cl) a) m UE � c C ,_ O o WW.[ a E a y '� a J O a y U Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simpity finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Doyon 15 Date: May 15, 2015 Surface Data Logging End of Well Report SP04-SE5 SP04-SE5 L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Mud Record 7. Bit Record 8. Morning Reports 9. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Doyon 15 Well: SP04-SE5 & SP04-SE5 L1 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-629-23537-00-00 (SP04-SE5) 50-629-23537-60-00 (SP04-SE5 L1) Sperry Job Number: AK-XX-0902267570 Job Start Date: 01 April 2015 Spud Date: 02 April 2015 Total Depth: 17418’ MD, 4132’ TVD (SP04-SE5) 17420’ MD, 4106’ TVD (SP04-SE5 L1) North Reference: True Declination: 18.857° Dip Angle: 81.060° Total Field Strength: 57580.400 nT Date Of Magnetic Data: 23 April 2015 Wellhead Coordinates N: North 70° 33' 28.20051" Wellhead Coordinates W: West 149° 54' 14.07965" Drill Floor Elevation 53.90’ Ground Elevation: 13.10’ Permanent Datum: Mean Sea Level SDL Engineers: Kori Jo Plowman, Christopher Silva, A. Paul Kalenuik, Gregory Dellner SDL Sample Catchers: Kyle Blazian, Hilarian Castro, Jacob Floyd, Jermond Holloway Company Geologist: Josh Zuber Company Representatives: Jack Keener / Mike Ross / Bruce Simonson SSDS Unit Number: 110 DAILY SUMMARY 04/01/2015 SDL continues on location from previous well. Skid rig floor into drilling position. Rig up operation in preparation for pre-spud acceptance. Set SDL mud logging unit and begin rig up 04/02/2015 Complete rig up operations. Calibrate gas equipment. Test surface equipment. Begin to pick up tools and bring BHA #1 to rig floor for Spud. Clean out conductor to 160’. Pick up BHA #2. Drill from 160’ MD to 392’ MD Gas: Max gas observed was 5 units at 391' MD with an average gas of 2 units. Fluids: No fluid lost to formation 04/03/2015 Continue to drill ahead from 392’ MD to 1,858’ MD Gas: Max gas observed was 532 units at 1,689' MD with an average gas of 72 units. Fluids: No fluid lost to formation 04/04/2015 Continue to drill ahead from 1,858’ MD to TD of 3,294’ MD. Begin to backream out of hole Gas: Max gas observed was 1056 units at 1,907' MD with an average gas of 109 units. Fluids: No fluid lost to formation 04/05/2015 Continue to backream out of the hole. Lay down BHA #2 Run 13 3/8” surface casing to 3,275’ MD. Circulate and condition hole Gas: Max gas observed while running casing was 6 units Fluids: No fluid lost to formation 04/06/2015 Circulate hole. Pump 485 bbls of cement. Chase with 476.5 bbls of mud. Nipple down flowline and riser. Nipple down stack. Nipple up BOPE. Pick up 5” drill pipe Gas: Max gas observed while circulating was 5 units Fluids: No fluid lost to formation 04/07/2015 Test BOPE. Make up BHA #3. Cut and slip drill line. Run in hole with mill and begin to mill casing. Gas: Max gas observed while milling casing was 30 units. Fluids: No fluid lost to formation 04/08/2015 Test 13 3/8” casing. Run in hole from 2,687’ MD to 3,153’ MD. Drill plugs and shoe track. Drill 20’ of new hole to 3,314’ MD. Perform leak off test to 12.5 ppg EMW. Drill ahead from 3,314’ MD to 4,271’ MD. Gas: Max gas observed was 72 units at 3,416' MD with an average gas of 11 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 04/09/2015 Drill from 4,271’ MD to 5,563’ MD. Gas: Max gas observed was 37 units at 5,457' MD with an average gas of 8 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 04/10/2015 Drill from 5,563’ MD to 6,769’ MD. Gas: Max gas observed was 952 units at 6,265' MD with an average gas of 58 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 04/11/2015 Drill from 6,769’ MD to intermediate TD of 7,613’ MD. Circulate bottoms up. Begin to backream out of hole Gas: Max gas observed was 77 units at 7,153' MD with an average gas of 21 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 04/12/2015 Backream out of hole from 7,595’ MD to 3,242’ MD. Circulate hole clean. Circulate bottoms up seven times. Pull out of hole on elevators from 3,242’ MD to 2,780’ MD. Pump 16 bbl dry job. Continue pulling to 342’ MD. Lay down BHA #3. Clean and clear rig floor. Change upper rams to 9 5/8”. Load casing equipment to floor. Rig up and test casing rams. Rig down test equipment. Gas: Max gas observed while backreaming was 62 units. Fluids: Total of 9 bbls lost to formation. 04/13/2015 Set wear ring. Rig up Volant tool. Run in hole with 9 5/8” casing to 3,998’ MD. Ream in hole from 3,998’ MD to 7,568’ MD. Make up landing joint and set casing at 7,598’ MD. Clear rig floor, rig down casing equipment. Rig up cement head. Circulate and condition mud for cement. Gas: Max gas observed while running casing was 5 units Fluids: No fluid lost to formation. 04/14/2015 Test cement lines. Cement casing. Drain stack. Rig down equipment. Rig down BOPE. Set emergency slips. Cut 9 5/8" casing. Install packoff and test. Nipple up BOP. Set test plug. Change out top rams to variable and test. Pick up 5" drill pipe. Change out to 4.5" tools. Load BHA tools in pipe shed. Gas: No significant gas data. Fluids: No fluid lost to formation. 04/15/2015 Pick up 45 joints of 4.5” drill pipe. Rig up and test BOPEs. Rig down equipment. Pull test plug. Set wear ring. Rig up and test 9 5/8” casing. Mobilize and make up BHA #4. Service rig. Change out tools to 4.5”. Single in hole with 4.5” drill pipe to 2,263’ MD. Fill pipe every 20 stands. Shallow hole test MWD tools. Single in hole to 6,068’ MD. Trip in hole from derrick to 7,386’ MD. Gas: No significant gas data. Fluids: No fluid lost to formation. 04/16/2015 Tag plug at 7,513' MD. Displace from LSND to 9.25 ppg FazePro oil-based mud. Clean surface equipment. Drill out shoe track and 20' of new hole to 7,633' MD. Pull out of hole to 7,574' MD and circulate mud. Perform formation integrity test at 13.0 ppg EMW. Rig down equipment. Begin to drill 8.75" production hole from 7,633' MD to 9,509' MD. Gas: Max gas observed was 2501 units at 8,197' MD with an average gas of 665 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 04/17/2015 Drill from 9,509' to 11,235' MD. Gas: Max gas observed was 1201 units at 10,270' MD with an average gas of 528 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 04/18/2015 Drill from 11,235’ MD to 13,085’ MD. Gas: Max gas observed was 2298 units at 12,098' MD with an average gas of 589 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 04/19/2015 Drill from 13,085' MD to 13,738' MD. Change out top drive wash pipe. Drill to 14,858' MD. Work on top drive shot pin and back up wrench assembly. Circulate. Drill to 14,930' MD. Gas: Max gas observed was 2136 units at 14,578' MD with an average gas of 594 units Fluids: Total of 8 bbls lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 04/20/2015 Drill from 14,925' MD to 15,979' MD Gas: Max gas observed was 1785 units at 15,578' MD with an average gas of 491 units Fluids: Total of 41 bbls lost to formation Geology: Samples consist of mainly clean sandstone 04/21/2015 Drill from 15,979' MD to production TD at 17,418' MD. Back ream out of hole from 17,418' MD to 16,912' MD. Gas: Max gas observed was 1793 units at 16,318' MD with an average gas of 862 units Fluids: Total of 34 bbls lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone and shale 04/22/2015 Back ream out of hole from 16,912' MD to 7,693' MD. Gas: Max gas observed while backreaming was 30 units. Fluids: Total of 97 bbls lost to formation 04/23/2015 Back ream out of hole from 7,693' MD to 7,482' MD. Encountered pack offs at 7,650' MD and 7,604' MD. Perform clean up cycle at each. W ork BHA through shoe and pull out of hole to 7,004' MD. Pump dry job and pull out to 1,216' MD. Circulate bottoms up twice, reciprocate to 1,181' MD, and pump dry job. Pull out of hole to 267' MD and lay down BHA #4. Cut drilling line, inspect and adjust brakes. Gas: Max gas observed while backreaming was 67 units. Fluids: Total of 44 bbls lost to formation 04/24/2015 Service crown, top drive, drawworks, and inspect saver sub. Rig up GBR 5.5" casing equipment. Run in hole with 5.5" slotted liner to 9,909' MD. Rig down casing equipment. Rig up SLB and Baker tools from 9,909' MD to 9,963' MD. Run in hole with 5" drill pipe from 9,963' MD to 10,149' MD. Gas: Max gas observed while running liner was 7 units. Fluids: Total of 5 bbls lost to formation 04/25/2015 Continue to run in hole with 5" drill pipe to 17,341' MD. Wash and rotate from 17,341' MD to 17,403' MD. Orient liner packer and set. Top of liner at 7,446' MD and liner shoe at 17,395' MD. Pull out of hole from 7,446' MD and lay down hanger tool. Clear rig floor and bring whipstock tools to floor. Make up whipstock and milling assembly. Run in hole with 5" drill pipe to 1,555' MD. Shallow hole test tools. Continue to run in hole to 6,690' MD. Gas: Max gas observed during whipstock run was 28 units. Fluids: Total of 9 bbls lost to formation 04/26/2015 Continue to run in hole with whipstock to 7,437' MD. Orient and set whipstock. Pressure up to verify release, no success. Re-orient whipstock. Pressure up, no success. Rotate, broke over. Pull out of hole and lay down whipstock BHA. Make up retrieval BHA. Run in hole with retrieval hook to 7,378' MD, shallow hole test at 1,585' MD. Orient hook, wash down, and tag top at 7,406' MD. Latch on at 7,411' MD and pull out of hole to 7,191' MD, no drag or swabbing. Run in hole to 7,378' MD and make 3 attempts to latch with no success. Pull out of hole and lay down retrieval BHA. Gas: Max gas observed during retrieval run was 23 units. Fluids: Total of 26 bbls lost to formation 04/27/2015 Clean rig floor. Rig up and wash stack. Drain stack, remove wear bushing, install test plug. Rig up for BOP test. Test BOP. Rig down test equipment. Pull test plug and install wear bushing. Make up second retrieval BHA. Run in hole with retrieval hook to 7,379' MD, shallow hole test at 1,492' MD. Orient hook, wash down to 7,411' MD and attempt to latch up to whipstock. Hook slips out. Attempt again to latch up, hook slips out. Gas: Max gas observed during retrieval run was 18 units. Fluids: No fluid lost to formation 04/28/2015 Make another attempt to latch up whipstock. Hook will not stay latched; decision is made to pull out of hole after one more attempt. Pull out of hole with retrieval hook and whipstock. Lay down second retrieval BHA and whipstock per Baker. Clean and clear rig floor. Cut and slip drill line. Service top drive, blocks, drawworks, and crown. Bring clean out tools to floor. Make up clean out BHA. Run in hole with clean out BHA to 5,758' MD. Gas: Max gas observed during cleanout run was 24 units. Fluids: Total of 14 bbls lost to formation 04/29/2015 Continue to run in hole with clean out BHA. Clean out liner top packer from 7,450' MD to 7,469' MD. Pull out of hole, clean and prepare BHA for re-run. Run in hole with clean out BHA to 7,466' MD and wash liner top packer. Pull out of hole and lay down clean out BHA. Clean and clear rig floor. Rig up stack washer, clean BOPE. Bring whipstock to floor. Make up whipstock BHA. Gas: Max gas observed during cleanout run was 8 units. Fluids: Total of 14 bbls lost to formation 04/30/2015 Continue to make up whipstock BHA. Run in hole to 7,350' MD. Perform directional work, orient and latch whipstock. Shear milling assembly off of whipstock. Mill window as per Baker from 7,407' MD to 7,450' MD. Bottom of window at 7,424’ MD. W ork mill through window with nothing abnormal detected. Begin to pull out of hole with milling BHA from 7,450' MD to 7,100' MD. Gas: Max gas observed was 6 units at 7,450' MD with an average gas of 5 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 05/01/2015 Continue to pull out of hole with milling assembly and lay down BHA. Clean and clear rig floor. Function test all rams. Rig up and clean stack. Blow down top drive. Make up BHA #11. Run in hole with 4.5" drill pipe to 7,390’ MD'. Shallow hole test at 1,697' MD. Circulate bottoms-up 1.5 times. Perform formation integrity test at 13.0 ppg EMW . Rig down test equipment. Drill ahead from 7,450' MD to 7,686' MD. Gas: Max gas observed was 21 units at 7,670' MD with an average gas of 17 units Fluids: Total of 13 bbls lost to formation Geology: Samples consist of sandstone, siltstone, and shale 05/02/2015 Drill from 7,686’ MD to 10,192’ MD. Gas: Max gas observed was 2104 units at 7,911' MD with an average gas of 627 units Fluids: No fluid lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 05/03/2015 Drill from 10,192’ MD to 12,246’ MD. Gas: Max gas observed was 1469 units at 11,178' MD with an average gas of 553 units Fluids: Total of 15 bbls lost to formation Geology: Samples consist of mainly clean sandstone with some areas of siltstone 05/04/2015 Drill from 12,246’ MD to 14,705’ MD. Gas: Max gas observed was 1792 units at 12,320' MD with an average gas of 774 units. Fluids: Total of 55 bbls lost to formation Geology: Samples consist of mainly clean sandstone 05/05/2015 Drill from 14,705’ MD to 16,900’ MD. Gas: Max gas observed was 1872 units at 16,233' MD with an average gas of 813 units Fluids: Total of 97 bbls lost to formation Geology: Samples consist of mainly clean sandstone 05/06/2015 Drill from 16,900' MD to L1 production TD at 17,420' MD. Circulate bottoms-up. Begin to backream out of the hole from to 11,502' MD. Gas: Max gas observed was 1386 units at 17,420' MD with an average gas of 314 units Fluids: Total of 121 bbls lost to formation Geology: Samples consist of mainly clean sandstone 05/07/2015 Continue to back ream out of hole to 7,803' MD. Work through window to 7,393' MD. Circulate bottoms-up three times. Weight up mud from 9.5 ppg to 9.6 ppg while circulating. Change out to 4.5" handling equipment. Pull out of hole on elevators to 6,335' MD. Encounter tight spot. Run in hole to 6,440' MD and circulate. Gas: Max gas observed while backreaming was 37 units. Fluids: Total of 74 bbls lost to formation 05/08/2015 Continue to circulate at 6,440' MD. Change out saver sub and service rig. Back ream out of hole to 1,222’ MD. Pull out of the hole and lay down BHA #11. Clean rig floor. Pick up whipstock retrieval BHA. Run in hole to 1,500' MD and shallow hole test MWD tools. Continue to run in hole to 5,628' MD. Gas: Max gas observed while backreaming was 55 units. Fluids: Total of 26 bbls lost to formation 05/09/2015 Continue to run in hole to 7,213' MD. Cut and slip drill line. Run in hole and wash down to 7,417' MD. Latch onto whipstock. Pull up to 7,370' MD. Pull out of hole to and lay down retrieval tool and whipstock. Make up cleanout BHA. Run in hole to 7,405' MD. Wash down and ream from 7,470’ MD to 7,440' MD. Circulate. Gas: Max gas observed during whipstock retrieval was 49 units. Fluids: Total of 136 bbls lost to formation 05/10/2015 Continue to circulate. Pull out of hole and lay down cleanout BHA. Clear rig floor. Rig up and test BOPE’s. Make up diverter BHA. Shallow hole test MWD tools. Run in hole to 5,278’ MD Gas: Max gas observed during cleanout run was 42 units. Fluids: Total of 22 bbls lost to formation 05/11/2015 Continue to run in hole to 7,408’ MD. Latch seal bore diverter to packer. Release run tool. Pull out of hole and lay down BHA. Clean rig floor. Rig up casing and 5.5” liner equipment. Run in hole with 5.5” slotted liner to 9,959’ MD. Rig down casing equipment and pick up hanger Gas: Max gas observed while running liner was 8 units. Fluids: Total of 10 bbls lost to formation 05/12/2015 Continue to run in hole to 17,395’ MD. Latch hanger to ram seal assembly. Pull out of hole and lay down run tool. Clean rig floor and service rig. Pick up and make up lateral entry module and MWD tools. Run in hole to 7,392’ MD and orient the lateral entry module Gas: Max gas observed during lateral entry module run was 35 units. Fluids: Total of 16 bbls lost to formation 05/13/2015 Continue to orient the lateral entry module and set. Test and confirm. Set packer and test. Displace from oil-based mud to brine. Clean surface equipment, cut and slip drill line. Pull out of hole while laying down 5” drill pipe. Lay down running tool and MWD tools. Lay down drill pipe from derrick Gas: Max gas observed was 10 units. Fluids: Total of 17 bbls lost to formation 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 0 5 10 15 20 25 30 35 40 45 50 Me a s u r e d D e p t h Rig Days Prognosed Actual WELL NAME: SP04-SE5 & SP04-SE5 L1 OPERATOR: ENI Petroleum MUD CO: MI Swaco RIG: Doyon 15 SPERRY JOB: AK-XX-0902267570 Days vs. Depth 01 April 2015 Sperry SDL Continued on Location LOCATION: Nikaitchuq AREA: North Slope Borough STATE: Alaska SPUD: 2-Apr-2015 TD: 6-May-2015 Landed 13.375" Casing 3275' MD, 2487' TVD 05 Apr 2015 Commenced 16" Surface Hole Section On Bot: 18:28 02 Apr 2015 TD Surface Hole Section 3294' MD, 2495' TVD Off Bot: 15:40 04 Apr 2015 Commenced 12.25" Intermediate Hole Section On Bot: 13:45 08 Apr 2015 TD Intermediate Hole Section 7613' MD, 4096' TVD Off Bot: 21:50 11 Apr 2015 Landed 9.625" Casing 7598' MD, 4095' TVD 14 Apr 2015 Commenced 8.75" Production Hole Section On Bot: 06:15 16 Apr 2015 TD Production Hole Section 17418' MD, 4132' TVD Off Bot: 15:40 21 Apr 2015 TD L1 Production Hole Section 17420' MD, 4108' TVD Off Bot: 06:30 06 May 2015 RIH Retrival Hook POOH with whipstock RIH Clean out BHA 28 Apr 2015 Commenced 8.75" L1 Production Hole Section On Bot: 17:30 01 May 2015 Mill Window through 9.625" Casing , BOW 7424' MD On Bot: 19:30 30 Apr 2015 RIH Mill Assembly POOH due to whipstock failure RIH Retreval Hook, POOH Fishing Trip failed 26 Apr 2015 WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:HOLE SECTION: EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Difficulties experienced: Changed out the gas analyzer due to moisture issues. Recommendations: We need to have a flow calibration done on the THC. Innovations and/or cost savings: The oiler for the gas trap was set very high. It should be set at one drop per minute according to the ROC. This will save quite a bit of air tool oil. Doyon 15 Surface Chris Silva 7-Apr-2015 What went as, or better than, planned: Drilling during surface section went very smooth. We had no Insite issues or computer issues. SP04-SE5 Nikaitchuq ENI Petroleum North Slope AK-XX-0902267570 Alaska Surface Data Logging After Action Review Surface Data Logging WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:HOLE SECTION: EMPLOYEE NAME:DATE: Difficulties experienced: The IRIS computer lost connection and had to be restarted. This took several trys as the computer would not accept the password. Recommendations: N/A Innovations and/or cost savings: N/A Drilling commenced without any issues. Samples were processed according to specifications and monitoring was doing as per Halliburton standards. SP04-SE5 Nikaitchuq ENI Petroleum North Slope AK-XX-0902267570 Alaska Doyon 15 Intermediate Alexander Kalenuik 7-May-2015 What went as, or better than, planned: Surface Data Logging After Action Review WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:HOLE SECTION: EMPLOYEE NAME:DATE: Drilling of the production section of the well began without incident. All hands worked in co-operation to log and collect samples as per the well plan. SP04-SE5 Nikaitchuq ENI Petroleum North Slope AK-XX-0902267570 Alaska Doyon 15 Production Alexander P Kalenuik 7-May-2015 What went as, or better than, planned: Difficulties experienced: We experienced different issues with regard to the gas equipment and the computers. The gas equipment would skip sections of depth by skipping 10' interval thus causing gaps on the logs. The computers ( ADI and the 4th computer) updated in the middle of drilling. They had to be shut down and restarted. There was no option to postpone this event. Recommendations: Change settings so that update can be postponed. Innovations and/or cost savings: N/A Surface Data Logging After Action Review WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:HOLE SECTION: EMPLOYEE NAME:DATE: Difficulties experienced: The time on the IRIS computer would occasionally jump backwards an hour, causing the display to freeze, then jump forward to the correct time. This would cause gaps on the log. Additionally, there was a brief power outage during a cleanout run prior to the start of this section. The UPS functioned perfectly for all of the computers, however, the monitors were not connected to the UPS. Fortunately, the outage did not last long and there were no pit or gas anomalies during that period. Recommendations: We have been instructed to change the battery in the motherboard of the IRIS computer. We are told this will stop the time changes. We have a new battery and we will change it during the rig down. Innovations and/or cost savings: N/A Drilling of the production (second lateral) section of the well went without incident. All hands worked in a cooperative manner to log and collect samples according to the well plan. SP04-SE5 Nikaitchuq ENI Petroleum North Slope AK-XX-0902267570 Alaska Doyon 15 Production (L1) Gregory Dellner 7-May-2015 What went as, or better than, planned: Surface Data Logging After Action Review WELL NAME:SP04-SE5 & SP04-SE5 L1 LOCATION:Nikaitchuq OPERATOR:ENI Petroleum AREA:North Slope Borough MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:2-Apr-2015 SPERRY JOB:AK-XX-0902267570 TD:6-May-2015 Marker MD INC AZ TVD TVDSS 16" Surface Borehole 20" Conductor Shoe 160.0 0.8 330.2 160.0 -106.1 SV-4 777.0 14.2 354.4 774.1 -720.2 SV-3 1,152.0 29.1 351.0 1,120.8 -1,066.9 SV-2 1,464.0 40.3 352.7 1,380.0 -1,326.1 Permafrost Base 1,987.0 41.8 348.9 1,778.9 -1,725.0 SV-1 2,218.0 44.8 348.5 1,946.5 -1,892.6 Ugnu Top (UG4)2,783.0 62.4 347.2 2,278.1 -2,224.2 13 3/8" Casing Shoe 3,275.0 65.1 346.8 2,486.9 -2,433.0 TD 16" Borehole 3,294.0 64.5 346.8 2,495.0 -2,441.1 12 1/4" Intermediate Borehole UG-2 Coal Bed Marker 3,950.0 57.9 3.9 2,828.0 -2,774.1 Lower Ugnu 5,219.0 57.8 68.1 3,554.8 -3,500.9 Schrader Bluff 5,882.0 69.1 88.5 3,857.5 -3,803.6 N Sequence Top 5,954.5 71.0 92.0 3,882.3 -3,828.4 N Sand Top 6,134.0 73.7 94.9 3,937.9 -3,884.0 N Sand Bottom 6,245.0 74.8 98.0 3,968.1 -3,914.2 N Sand Base 6,373.0 77.8 101.8 3,998.4 -3,944.5 9 5/8" Intermediate Casing 7,598.0 86.2 128.7 4,094.9 -4,041.0 TD 12 1/4" Borehole 7,613.0 86.3 129.8 4,095.8 -4,041.9 SP04-SE5 Lateral OA Sand Top 7,766.0 85.8 126.2 4,106.5 -4,052.6 OA-2 7,854.0 86.3 127.1 4,112.8 -4,058.9 OA-3 7,904.0 86.8 127.6 4,115.8 -4,061.9 OA-3 8,750.0 91.6 128.3 4,127.5 -4,073.6 OA-2 8,804.0 91.3 127.2 4,126.2 -4,072.3 OA-2 9,981.0 87.1 125.5 4,133.6 -4,079.7 OA-3 10,056.0 87.2 126.2 4,137.1 -4,083.2 OA-3 11,655.0 92.0 124.6 4,142.9 -4,089.0 Fault A 11,820.0 89.5 122.0 4,141.0 -4,087.1 OA-3 12,215.0 91.3 124.5 4,138.8 -4,084.9 OA-2 12,440.0 90.6 124.7 4,135.2 -4,081.3 OA-2 13,614.0 88.4 124.7 4,133.1 -4,079.2 OA-3 13,752.0 88.5 126.6 4,138.2 -4,084.3 OA-3 15,216.0 91.9 123.4 4,139.6 -4,085.7 OA-2 15,418.0 91.5 123.8 4,135.1 -4,081.2 OA-2 16,745.0 87.9 123.9 4,119.7 -4,065.8 OA-3 16,900.0 88.1 124.4 4,124.0 -4,070.1 TD SP04-SE5 17,418.0 91.0 126.5 4,131.8 -4,077.9 Formation Tops WELL NAME:SP04-SE5 & SP04-SE5 L1 LOCATION:Nikaitchuq OPERATOR:ENI Petroleum AREA:North Slope Borough MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:2-Apr-2015 SPERRY JOB:AK-XX-0902267570 TD:6-May-2015 Marker MD INC AZ TVD TVDSS SP04-SE5 L1 Lateral TOW 7,407.0 86.1 127.5 4,081.3 -4,027.4 BOW 7,424.0 86.0 127.7 4,082.5 -4,028.6 OA Sand Top 7,840.0 86.9 141.8 4,105.8 -4,051.9 OA-2 8,420.0 89.7 131.5 4,118.8 -4,064.9 OA-3 8,560.0 88.7 130.5 4,120.7 -4,066.8 OA-4 9,300.0 88.1 125.7 4,146.8 -4,092.9 OA-4 9,503.0 91.1 123.0 4,146.8 -4,092.9 OA-3 10,183.0 90.6 128.8 4,136.4 -4,082.5 OA-2 10,410.0 90.1 131.0 4,135.0 -4,081.1 Fault 1 11,225.0 89.1 124.9 4,138.9 -4,085.0 OA-2 11,540.0 90.7 123.8 4,140.1 -4,086.2 OA-2 11,800.0 88.0 125.5 4,143.2 -4,089.3 Fault 2 11,840.0 87.8 125.9 4,144.6 -4,090.7 OA-3 13,860.0 91.0 122.4 4,136.7 -4,082.8 OA-2 14,080.0 90.5 124.2 4,134.6 -4,080.7 OA-2 15,170.0 89.4 125.4 4,131.9 -4,078.0 OA-3 15,270.0 88.4 125.7 4,134.0 -4,080.1 OA-4 15,870.0 89.5 124.9 4,147.1 -4,093.2 OA-4 15,940.0 90.5 125.7 4,147.4 -4,093.5 OA-3 16,920.0 92.4 124.6 4,119.0 -4,065.1 OA-2 17,040.0 91.9 124.7 4,114.3 -4,060.4 TD SP04-SE5L1 17,420.0 91.7 125.4 4,106.0 -4,052.1 Formation Tops SP04-SE5 & SP04-SE5 L1 ENI Petroleum MI Swaco Doyon 15 AK-XX-0902267570 Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/R 6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++ 2-Apr 279 8.80 120 28 37 20/48/63 5.4 93/65/54/40/20/19 2/NA 3.0 -/97 0.15 0.30 10.0 22.0 0.25/0.80 3000 40 Drill 16" hole 3-Apr 1661 9.25 85 25 34 19/44/55 5.4 90/64/49/37/17/19 2/NA 4.8 -/95.25 0.15 0.20 9.7 23.0 0.15/0.65 13500 70 Drill 16" hole 4-Apr 3294 9.35 100 37 29 19/48/62 5.5 95/66/54/41/17/15 2/NA 5.5 -/94.5 0.20 0.25 9.7 24.0 0.10/0.80 6000 48 BROOH 5-Apr 3294 9.30 45 15 14 5/5/5 -44/29/20/14/5/4 -----8.2 ----Run 13 3/8" Casing 6-Apr 3294 9.30 44 15 14 5/5/5 -44/29/20/14/5/5 -----8.2 ----Cement casing 7-Apr 3294 9.30 41 13 11 4/5/5 -37/24/17/11/5/4 -----8.3 ----Mill casing 8-Apr 3957 9.30 46 15 15 10/12/14 4.3 45/30/23/19/11/9 1/NA 4.0 2/94 --9.6 5.0 0.40/1.80 1500 120 Drill 12.25" hole 9-Apr 5389 9.30 45 11 22 9/14/18 4.6 44/33/24/19/10/8 1/NA 4.0 3/93 0.10 0.70 9.5 11.0 0.30/1.60 1600 160 Drill 12.25" hole 10-Apr 6604 9.30 49 14 21 10/14/17 4.4 49/35/29/22/11/8 1/NA 6.0 3/91 0.10 0.70 9.5 12.0 0.40/1.50 1500 120 Drill 12.25" hole 11-Apr 7538 9.40 47 13 20 12/16/20 4.6 46/33/26/10/11/9 1/NA 6.2 3/91 0.10 0.70 9.6 13.0 0.40/1.60 1500 120 Circulate bottoms up 12-Apr 7613 9.40 46 15 18 11/15/21 4.6 48/33/24/19/10/9 1/NA 6.0 3/91 0.10 0.60 9.6 13.0 0.30/1.60 1500 120 Rig Down Testing Equipment 13-Apr 7613 9.40 48 11 22 13/16/23 4.4 44/33/27/21/14/11 1/NA 6.0 3/91 0.10 0.60 9.5 13.0 0.30/1.40 1500 120 Condition mud 14-Apr 7613 9.40 47 12 19 13/16/21 4.4 43/31/26/19/12/10 1/NA 6.0 3/91 0.10 0.60 9.5 13.0 0.30/1.40 1500 120 Load BHA to pipe shed 15-Apr 7613 9.40 53 12 20 13/17/23 -44/32/27/20/12/11 ----------RIH BHA #4 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/R 6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG 16-Apr 9278 9.3 48 14 17 7/7/8 4.4 45/31/25/19/8/7 NA/2 6.52 67/33 2.7 3.51 750 30.47 -7.88/54.39 2.7 Drill 8.75" Hole 17-Apr 10974 9.4 45 13 17 7/7/8 4.4 43/30/24/18/8/7 NA/1 7.82 69/31 2.6 3.38 745 30.09 -19.71/58.9 2.9 Drill 8.75" Hole 18-Apr 12804 9.4 45 12 16 6/7/7 4.2 40/28/22/16/7/6 NA/1 8.06 69/31 2.6 3.38 685 28.69 -21.06/60.3 2.9 Drill 8.75" Hole 19-Apr 14858 9.4 48 13 16 7/8/8 4.2 42/29/23/17/7/6 NA/1 9.02 70/30 2.3 2.99 700 30.23 -17.79/71.03 2.8 Drill 8.75" Hole 20-Apr 15588 9.4 45 14 14 6/6/7 4.4 42/28/23/17/7/6 NA/1 8.97 70/30 2.6 3.38 715 30.53 -18.63/70.06 2.8 Drill 8.75" Hole 21-Apr 17418 9.4 47 15 15 7/7/8 4.6 45/30/23/17/7/6 NA/1 8.97 70/30 2.4 3.12 763 30.53 -13.12/73.47 2.8 BROOH 22-Apr 17418 9.4 46 14 12 6/6/7 4.6 40/26/21/15/6/5 NA/1 8.87 70/30 2.1 2.73 760 31.39 -12.37/72.58 2.8 BROOH 23-Apr 17418 9.4 47 15 12 6/6/7 -42/27/21/15/6/5 NA/-8.87 70/30 2.0 2.6 706 31.67 -12.13/72.27 2.8 Cut drilling line 24-Apr 17418 9.4 52 16 12 7/7/7 -44/28/22/17/7/6 NA/-8.87 70/30 1.9 2.47 721 31.67 -12.13/72.27 2.8 RIH w/liner 25-Apr 17418 9.4 49 15 12 6/7/7 -42/27/21/16/7/6 NA/-8.87 70/30 2.1 2.73 718 31.67 -12.13/72.27 2.8 RIH w/Whipstock 26-Apr 17418 9.4 52 17 9 6/6/7 -43/26/21/16/6/5 NA/-8.77 68/32 2.2 2.86 550 30.09 -8.92/74.68 2.7 L/D whipstock BHA 27-Apr 17418 9.4 52 15 13 6/6/7 -43/28/22/15/6/5 NA/-8.77 68/32 2.4 3.12 450 30.36 -8.66/74.39 2.7 Latch onto whipstock 28-Apr 17418 9.4 52 15 13 6/6/7 -42/28/20/15/6/5 NA/-8.77 68/32 2.4 3.12 450 30.36 -8.66/74.39 2.7 RIH w/clean out BHA 29-Apr 17418 9.4 53 16 12 6/7/7 -44/28/21/16/7/6 NA/1 8.77 68/32 2.4 2.99 451 30.36 -8.66/74.39 2.7 M/U Whipstock 30-Apr 7445 9.45 53 18 14 6/7/7 4.8 50/32/24/17/6/5 NA/1 8.77 68/32 2.7 3.51 526 30.36 -10.87/73.03 2.7 POOH 1-May 7580 9.45 56 17 16 6/7/7 4.8 50/33/25/19/7/6 NA/1 8.77 68/32 2.8 3.64 527 30.36 -11.97/72.34 2.7 Drill 8.75" Hole 2-May 9858 9.45 53 19 17 7/7/8 4.8 55/36/29/21/7/6 NA/1 8.89 68/32 2.4 3.12 612 29.68 -11.52/73.74 2.7 Drill 8.75" Hole 3-May 12070 9.5 51 16 18 7/8/8 4.3 50/34/24/19/7/6 NA/1 9.57 68/32 2.4 3.12 763 28.41 -14.96/73.61 2.8 Drill 8.75" Hole 4-May 14363 9.5 52 16 19 7/7/8 4.4 51/35/26/20/7/6 NA/1 8.96 68/32 2.4 3.12 773 29.26 -14.13/72.79 2.8 Drill 8.75" Hole 5-May 16674 9.45 52 17 16 7/7/8 4.5 50/33/27/18/7/6 NA/1 9.01 68/32 2.2 2.86 784 29.16 -14.37/73.04 2.8 Drill 8.75" Hole 6-May 17420 9.45 53 15 18 6/7/7 4.7 48/33/26/18/7/6 NA/1 9.08 68/32 2.2 2.86 865 29.35 -14.63/73.55 2.8 BROOH 7-May 17420 9.6 51 16 16 6/7/7 -48/32/25/18/7/6 NA/-9.55 69/31 2.2 2.86 820 28.88 -16.39/76.74 2.8 Circulate Hole 8-May 17420 9.6 53 15 15 6/6/7 -45/30/23/16/7/6 NA/-9.96 68/32 2.2 2.86 780 29.26 -17/75.56 2.8 RIH Retrieval Tool 9-May 17420 9.5 52 14 15 6/6/7 -43/29/22/15/7/6 NA/-9.21 68/32 2.2 2.86 760 29.26 -16.67/73.5 2.8 Circulate Hole 10-Jan 17420 9.45 53 14 14 6/6/7 -42/28/23/14/7/6 NA/-9.11 68/32 2.1 2.73 640 28.41 -7.79/78.04 2.7 Circulate/Test BOPE's 11-Jan 17420 9.45 54 14 15 6/7/7 -43/29/24/15/7/6 NA/-9.16 68/32 2.1 2.73 630 28.12 -16.34/73.19 2.8 RIH Seal Bore 12-Jan 17420 9.45 53 14 14 6/7/7 -42/28/24/15/7/6 NA/-9.16 68/32 2.1 2.73 630 28.12 -16.34/73.19 2.8 Run 5.5" casing Casing Record 9.625" Intermediate @ 7598' MD, 4095' TVD WELL NAME:LOCATION:Nikaitchuq OPERATOR:AREA:North Slope Borough MUD CO:STATE:Alaska RIG:SPUD:2-Apr-2015 SPERRY JOB:TD:6-May-2015 Remarks 20" Conductor @160' MD, 160' TVD 13.375" Surface @ 3275' MD, 2487' TVD W a t e r a n d O i l B a s e d M u d R e c o r d BHA# SDL RUN # Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 2 100 1 Hughes MX-1 Mill Tooth 16.00 160 3294 3134 22.90 1.117 136.8 20 40 2020 800 1-1-WT-A-E-IN-NO-TD Surface TD 3 200 2 HAL MM75D PDC 12.25 3294 7613 4319 57.40 0.969 75.3 15 180 2100 800 3-4-BT-A-X-IN-ST-TD Intermediate TD 4 300 3 Hycalog SKH16M-K1D PDC 8.75 7613 17418 9805 84.60 0.902 115.9 9 140 2400 500 2-3-CT-A-X-I-WT-TD Production TD 10 500 N/A Hughes Window & Watermellon Mill 8.75 7424 7450 26 2.00 1.243 17.3 N/A 77 1500 500 N/A Mill Window through 9 5/8" Csg 11 600 4 Hycalog SKH616M-E1D PDC 8.75 7450 17420 9970 68.90 0.902 144.6 10 120 3400 550 1-2-WT-T-X-IN-NO-TD L1 Production TD Alaska RIG:Doyon 15 SPUD:2-Apr-2015 WELL NAME:SP04-SE5 & L1 LOCATION:Nikaitchuq OPERATOR:ENI Petroleum AREA:North Slope Borough MUD CO: SPERRY JOB:AK-XX-0902267570 TD:6-May-2015 MI Swaco STATE: B i t R e c o r d . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth C-5nC-2 in Minimum Depth Time: 0' 0' 0' Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J. Keener/S. Bowe ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Rig up PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Depth in / out Mud Type Lst Type Average 0Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 ConditionBit #Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 1 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLIUM SPY ISLAND NORTH SLOP ROP ROP (ft/hr) 4.23 @ Mud Data Depth 1-Apr-2015 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l Rig up. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Finish rigging up. Test surface equipment. Clean out conductor to 160' MD. Drill from 160' MD to 392' MD. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 3000.00 0 2-Apr-2015 12:00 AM Current Pump & Flow Data: 13 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 2 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLIUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 18.39 DOYON 15 Report For: ConditionBit # 1 3.0 16Mill Tooth 8.80 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' WOB Evermar 10.4512.04 Avg Min Comments RPM ECD (ppg) ml/30min 2Background (max)Trip Average Mud Type Lst Type Spud 5.49'37 Depth in / out YP (lb/100ft2) 10.00 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Drilling 16" hole PV Footage 1.80 J. Keener/S. Bowe ShClyst TuffGvlCoal cP 28 Gas Summary 0 0 0 (current) Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: 637.8 Flow In (gpm) Flow In (spm) 0' 392' 392' Max @ ft Current 391'187.4 Date: Time: Max gas was 5 units. 2 in 0 161'Minimum Depth C-5n 391' 0.0 C-2 5 SPP (psi) Gallons/stroke TFABit Type Depth 22.0120 MBT Present pH 1.117 0 0 0 Siltst 0 0 Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 303 . . * 24 hr Recap:Drilled ahead from 392' MD to 1,858' MD. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 12500.00 0 3-Apr-2015 12:00 AM Current Pump & Flow Data: 1042 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 3 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLIUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 858.11 DOYON 15 Report For: ConditionBit # 1 4.8 16Mill Tooth 9.25 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' WOB Evermar 6.6811.84 Avg Min Comments RPM ECD (ppg) ml/30min 266Background (max)Trip Average Mud Type Lst Type Spud 5.41661'34 Depth in / out YP (lb/100ft2) 9.70 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Drilling 16" hole PV Footage 1.80 J. Keener/S. Bowe ShClyst TuffGvlCoal cP 25 Gas Summary 0 0 0 (current) Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: 462.4 Flow In (gpm) Flow In (spm) 392' 1858' 1466' Max @ ft Current 676'169.5 Date: Time: Max gas was 532 units. No gains or losses. 72 in 2 394'Minimum Depth C-5n 1689' 192.4 C-2 532 SPP (psi) Gallons/stroke TFABit Type Depth 23.085 MBT Present pH 1.117 0 0 0 Siltst 683 162 Units* Casing Summary Lithology (%) 00 24 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 55243 . . * 24 hr Recap:Drill from 1858' MD to 3294' MD. Back ream out of hole from 3294' MD to 1715' MD. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 6000.00 0 4-Apr-2015 12:00 AM Current Pump & Flow Data: 1525 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 4 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLIUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 269.11 DOYON 15 Report For: ConditionBit # 1 5.5 16Mill Tooth 9.35 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' 3294' WOB Evermar 6.2010.37 Avg Min Comments RPM ECD (ppg) ml/30min 22Background (max)Trip Average Mud Type Lst Type Spud 5.03294'37 Depth in / out YP (lb/100ft2) 9.70 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 BROOH PV 3134' Footage 23.80 J. Keener/S. Bowe ShClyst TuffGvlCoal cP 29 Gas Summary 0 0 0 (current) Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: 465.1 Flow In (gpm) Flow In (spm) 1858' 3294' 1436' Max @ ft Current 2943'38.9 Date: Time: Max gas was 1056 units. No gains or losses. 109 in 0 1810'Minimum Depth C-5n 3294' 0.0 C-2 1056 SPP (psi) Gallons/stroke TFABit Type Depth 24.0100 MBT Present pH 1.117 0 0 0 Siltst 852 201 Units* Casing Summary Lithology (%) 011432 0 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 137518 . . * 24 hr Recap:Back ream out of hole. Run 13 3/8" surface casing to 3275' MD. Circulate and condition hole. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 0 5-Apr-2015 12:00 AM Current Pump & Flow Data: 163 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 5 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: ConditionBit # 1 16Mill Tooth 9.30 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' 3294' WOB Evermar Avg Min Comments RPM ECD (ppg) ml/30min 4Background (max)Trip Average Mud Type Lst Type Spud3294'14 Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Circulate/Condition Hole PV 3134' Footage 23.80 J. Keener/S. Bowe ShClyst TuffGvlCoal cP 15 Gas Summary 0 0 0 (current) Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 3294' 3294' 0' Max @ ft Current Date: Time: Max gas was 1326 units. 2 bbl loss. 12 in 0Minimum Depth C-5nC-2 1326 SPP (psi) Gallons/stroke TFABit Type Depth 45 MBT Present pH 1.117 0 0 0 Siltst 213 50 Units* Casing Summary Lithology (%) 0136 0 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) 0 0 Cly 155216 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva 0 0 16.00'' Units* Casing Summary Lithology (%) 0 L-80 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 44 C-5nC-2 in Minimum Depth Time: Nipple down stack. Nipple up BOPE's. Pick up 5" drill pipe. 3294' 3294' 0' Max @ ft Current Date: Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) J. Keener/S. Bowe ShClyst TuffGvlCoal cP 15 3134' 12.25 0.969 Footage 23.80 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 P/U 5" DP PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 8.20 000 PDC Spud 3294' 3294'14 Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' 3294' WOB Evermar 100% Gas In Air=10,000 UnitsConnection 0 3275' 160' ConditionBit # 1 16Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 6 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 6-Apr-2015 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l Circulate hole. Pump 485 bbls cement, chase with 476.5 bbls mud. Nipple down flowline and riser. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Test BOPE. Make up BHA. Cut and slip drill line. Run in hole with mill. Max gas was 30 units. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 0 7-Apr-2015 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 7 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: ConditionBit # 1 16Mill Tooth 9.30 Size 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' 3294' WOB Evermar Avg Min Comments Surface RPM ECD (ppg) ml/30min 0Background (max)Trip Average Mud Type Lst Type PDC Spud 3294' 3294'11 Depth in / out YP (lb/100ft2) 8.30 000 00 CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Mill Casing PV 3134' 12.25 0.969 Footage 23.80 M. Ross/O. Amend ShClyst TuffGvlCoal cP 13 Gas Summary 0 0 0 (current) Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 3294' 3294' 0' Max @ ft Current Date: Time: 5 in 0Minimum Depth C-5nC-2 30 SPP (psi) Gallons/stroke TFABit Type Depth 41 L-80 MBT Present pH 1.117 0 0 0 Siltst 16.00'' Units* Casing Summary Lithology (%) 061 0 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Alexander Kalenuik/Chris Silva Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 0 0 Cly 322 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 11272 10 Set AtSize 178.9 X-65 Grade 20.00'' 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Alexander Kalenuik/Chris Silva 10452 1124 16.00'' 770 182 Units* Casing Summary Lithology (%) 0 L-80 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 5.046 C-5n 3416' 158.7 C-2 72 in 2 3294'Minimum Depth Time: ahead from 3314' MD to 4271. Max gas was 72 units, no fluid gains or losses. 11 3294' 4271' 977' Max @ ft Current 4271'41.3 Date: Avg to3294' Yesterday's Depth: Current Depth: 24 Hour Progress: 482.2 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) M. Ross/O. Amend ShClyst TuffGvlCoal cP 15 3134' 12.25 0.969 Footage 23.80 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Drill 12.25" hole PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.60 000 PDC LSND 4.3 3294' 3957'15 Depth in / out Mud Type Lst 90 Type Average 10Background (max)Trip 9.549.70 Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' 3294' WOB Evermar 100% Gas In Air=10,000 UnitsConnection 0 3275' 160' ConditionBit # 1 4.0 16Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.00 DOYON 15 Report For: Morning Report Report # 8 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 8-Apr-2015 12:00 AM Current Pump & Flow Data: 1273 Max 0 Chlorides mg/l 1500.00 Test 13 3/8" casing. Run in hole from 2687' MD to 3153. Drill plugs, shoe track. Drill 20' new hole to 3314' MD. Drill Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drilled from 4271' MD to 5571' MD. Max gas was 37 units. No fluid gains or losses. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1600.00 0 9-Apr-2015 12:00 AM Current Pump & Flow Data: 1942 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 9 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.53 DOYON 15 Report For: ConditionBit # 1 4.0 16Mill Tooth 9.30 Size 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' 3294' WOB Evermar 9.509.73 Avg Min Comments Surface RPM ECD (ppg) ml/30min 7Background (max)Trip Average Mud Type Lst 80 Type PDC LSND 4.6 3294' 5389'22 Depth in / out YP (lb/100ft2) 9.50 000 00 CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Drill 12.25" hole PV 3134' 12.25 0.969 Footage 23.80 M. Ross/O. Amend ShClyst TuffGvlCoal cP 11 Gas Summary 0 0 0 (current) Avg to3294' Yesterday's Depth: Current Depth: 24 Hour Progress: 585.3 Flow In (gpm) Flow In (spm) 4271' 5563' 1292' Max @ ft Current 5562'57.7 Date: Time: 8 in 3 4215'Minimum Depth C-5n 5457' 252.2 C-2 37 SPP (psi) Gallons/stroke TFABit Type Depth 11.045 L-80 MBT Present pH 1.117 0 0 0 Siltst 16.00'' 904 214 Units* Casing Summary Lithology (%) 01525 51 907-685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Alexander Kalenuik/Chris Silva Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 0 0 Cly 5896 20 . . * 24 hr Recap: (max)(current) BTC 352 0 Cly 91981 20 Set AtSize 178.9 X-65 Grade 20.00'' (907)685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Alexander Kalenuik/Chris Silva 0 19 16.00'' 706 167 Units* Casing Summary Lithology (%) 0 L-80 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 12.049 C-5n 6265' 71.1 C-2 952 in 5 6385'Minimum Depth Time: 58 5563' 6769' 1206' Max @ ft Current 6768'51.8 Date: Avg to3294' Yesterday's Depth: Current Depth: 24 Hour Progress: 435.6 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) M. Ross/O. Amend ShClyst TuffGvlCoal cP 14 3134' 12.25 0.969 Footage 23.80 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Drill 12.25" hole PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.50 000 PDC LSND 4.4 3294' 6604'21 Depth in / out Mud Type Lst 80 Type Average 12Background (max)Trip 9.629.75 Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' 3294' WOB Evermar 100% Gas In Air=10,000 UnitsConnection 32 3275' 160' ConditionBit # 1 6.0 16Mill Tooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.95 DOYON 15 Report For: Morning Report Report # 10 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 10-Apr-2015 12:00 AM Current Pump & Flow Data: 1612 Max 0 Chlorides mg/l 1500.00 Drilled from 5563' MD to 6769' MD. Max gas was 952 units, no fluid gains or losses. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drilled from 6769' MD to 7613' MD. Circulate bottoms up. Max gas was 77 units, no fluid losses or gains. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1500.00 0 11-Apr-2015 12:00 AM Current Pump & Flow Data: 2626 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 11 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.58 DOYON 15 Report For: ConditionBit # 1 6.2 16Mill Tooth 9.40 Size 3275' 160' 100% Gas In Air=10,000 UnitsConnection 6 Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' 3294' WOB Evermar 9.349.91 Avg Min Comments Surface RPM ECD (ppg) ml/30min 17Background (max)Trip Average Mud Type Lst 70 Type PDC LSND 4.6 3294' 7538'20 Depth in / out YP (lb/100ft2) 9.60 000 00 CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 Circulate bottoms up PV 3134' 12.25 0.969 Footage 23.80 M. Ross/O. Amend ShClyst TuffGvlCoal cP 13 Gas Summary 0 6 0 (current) Avg to3294' Yesterday's Depth: Current Depth: 24 Hour Progress: 181.9 Flow In (gpm) Flow In (spm) 6769' 7613' 844' Max @ ft Current 6793'36.6 Date: Time: 21 in 6 7210'Minimum Depth C-5n 7153' 0.0 C-2 77 SPP (psi) Gallons/stroke TFABit Type Depth 13.047 L-80 MBT Present pH 1.117 0 4 0 Siltst 16.00'' 901 213 Units* Casing Summary Lithology (%) 02220 448 (907)685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Alexander Kalenuik/Chris Silva Set AtSize 178.9 X-65 Grade 20.00'' (max)(current) BTC 34 0 Cly 10912 30 . . * 24 hr Recap: (max)(current) BTC 42 0 Cly 9123 30 Set AtSize 178.9 X-65 Grade 20.00'' (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner 1140 0 16.00'' Units* Casing Summary Lithology (%) 0 L-80 MBT Present pH 1.117 0 3 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 13.046 C-5n - C-2 62 in 2 -Minimum Depth Time: 9 7613' 7613' 0' Max @ ft Current Date: Avg to7613' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 4 0 (current) M. Ross/O. Amend ShClyst TuffGvlCoal cP 15 3134' 12.25 0.969 Footage 57.40 4319' 23.80 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 - - R/D Test Equip. PV 24 hr Max 68.0 Weight 3 Hours C-3 00 CementCht Silt C-4i C-4n YP (lb/100ft2) 9.60 000 180PDC LSND 4.6 3294' 7613'18 7613' Depth in / out Mud Type Lst 70 Type Average 0Background (max) Trip Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools None API FL Chromatograph (ppm) 15 160' 3294' WOB Evermar 100% Gas In Air=10,000 UnitsConnection 7 2 test casing rams. R/D test equip, pull test plug. Total daily mud loss=9bbls. 16bbl dry job, cont. pulling t/342'. L/D BHA. Clean/clear rig floor. Change upper rams t/9-5/8", load casing equip to floor. R/U & 3275' 160' ConditionBit # 1 6.0 16Mill Tooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 12 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE 3-4-BT-A-X-IN-ST-TD Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 12-Apr-2015 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 1500.00 BROOH as per K&M f/7595' t/3242' @900gpm. Circulate hole clean @900gpm. Cont. to circ. hole clean @ 900 gpm, Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Set wear ring, L/D test jt, clear floor, bring cement head to floor. R/U Volant tool. RIH w/9-5/8" casing t/3998'. Ream in Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1500.00 0 13-Apr-2015 12:00 AM Current Pump & Flow Data: Max 3-4-BT-A-X-IN-ST-TD Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 13 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: ConditionBit # 1 6.0 16Mill Tooth 9.40 Size 2 plan. Circulate and condition mud for cement. 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools None API FL Chromatograph (ppm) 15 160' 3294' WOB Evermar Avg Min Comments Surface RPM ECD (ppg) ml/30min 0Background (max) Trip Average Mud Type Lst 70 Hydril 563 Type 180PDC LSND 4.4 3294' 7613'22 7613' Depth in / out YP (lb/100ft2) 9.50 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 - - Condition mud PV 3134' 12.25 0.969 Footage 57.40 4319' 23.80 M. Ross/O. Amend ShClyst TuffGvlCoal cP 11 40.0 Gas Summary 0 0 0 (current) Avg to7613' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 7613' 7613' 0' Max @ ft Current Date: Time: 0 in 0 -Minimum Depth C-5n - C-2 0 SPP (psi) Gallons/stroke TFABit Type Depth 13.048 L-80 MBT Present pH 1.117 0 0 0 Siltst 16.00'' Units* Casing Summary Lithology (%) 00 0 (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 178.9 X-65 Grade L-807598' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 0 30 . . * 24 hr Recap: (max)(current) BTC 0 0 Cly 0 30 Set AtSize 178.9 X-65 Grade L-807598' 20.00'' 9.63'' (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner 0 0 16.00'' Units* Casing Summary Lithology (%) 0 L-80 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 13.047 C-5n - C-2 0 in 0 -Minimum Depth Time: 0 7613' 7613' 0' Max @ ft Current Date: Avg to7613' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) M. Ross/O. Amend ShClyst TuffGvlCoal cP 12 3134' 12.25 0.969 Footage 57.40 4319' 23.80 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 - - Load BHA in pipe shed PV 24 hr Max 68.0 Weight 0 Hours C-3 00 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 9.50 000 180PDC LSND 4.4 3294' 7613'19 7613' Depth in / out Mud Type Lst 70 Hydril 563 Type Average 0Background (max) Trip Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools None API FL Chromatograph (ppm) 15 160' 3294' WOB Evermar 100% Gas In Air=10,000 UnitsConnection 0 2 DP. C/O to 4.5" tools. Load BHA tools in pipe shed. 3275' 160' ConditionBit # 1 6.0 16Mill Tooth 9.35 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Morning Report Report # 14 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE 3-4-BT-A-X-IN-ST-TD Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 14-Apr-2015 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 1500.00 Circ & cond hole. Test cmt lines. OK. Cmt casing. Check floats. OK. No mud loss. Drain stack. R/D equip. R/D Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:P/U 45 jts 4.5" DP. R/U & test BOPE's & related equip per regulations. R/D equip. Pull test plug. Set wear ring. R/U Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 0 15-Apr-2015 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 15 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON 15 Report For: Condition 3-4-BT-A-X-IN-ST-TD Bit # 2 12.25PDC 9.40 Size 3 stds. Overboard LSND mud as needed. Shallow test MWD. OK. Single in hole to 6,068'. TIH f/ derrick to 7,386'. 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed675, PeriScope675, Telescope675 API FL Chromatograph (ppm) 15.03294' 7613' WOB Evermar Avg Min Comments Surface RPM ECD (ppg) ml/30min 0Background (max) Trip Average Mud Type Lst 70 Hydril 563 Type 180.0 PDC LSND 7613' 7613'20 Depth in / out YP (lb/100ft2) 000 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902267570 - - RIH BHA #4 PV 4319' 8.75 0.902 Footage 57.40 M. Ross/O. Amend ShClyst TuffGvlCoal cP 12 40.0 Gas Summary 0 0 0 (current) Avg to7613' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 7613' 7613' 0' Max @ ft Current Date: Time: 0 in 0 -Minimum Depth C-5n - C-2 0 SPP (psi) Gallons/stroke TFABit Type Depth 53 L-80 MBT Present pH 0.969 0 0 0 Siltst 16.00'' Units* Casing Summary Lithology (%) 00 0 (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 178.9 X-65 Grade L-807598' 20.00'' 9.63'' (max)(current) BTC 0 0 Cly 0 30 . . * 24 hr Recap: Lime Cor Solids (lb/bbl) % 3.51 6.5 (max)(current) BTC 693 0 Cly 268538 10 Set AtSize 178.9 X-65 Grade L-807598' 20.00'' 9.63'' (907)685-0772Unit Phone: 17 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner 76537 8 16.00'' 501 119 Units* Casing Summary Lithology (%) 61 L-80 Oil / Water Present Alkal 0.969 0 77 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 67/3348 C-5n 8197' 5.0 C-2 2501 in 2 7613'Minimum Depth Time: 665 7613' 7613' 0' Max @ ft Current 8051'281.7 Date: Avg to7613' Yesterday's Depth: Current Depth: 24 Hour Progress: 456.2 Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 71 43 (current) M. Ross/O. Amend ShClyst TuffGvlCoal cP 14 4319' 8.75 0.902 Footage 57.40 Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drill 8.75" Hole PV 24 hr Max 68.0 Weight 282 Hours C-3 00 Intermediate CementCht Silt C-4i C-4n YP (lb/100ft2) 2.70 236747 180.0 PDC FazePro NA 7613' 9278'17 Depth in / out Mud Type Lst 90 Hydril 563 Type Average 3Background (max) Trip 9.6910.31 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed675, PeriScope675, Telescope675 API FL Chromatograph (ppm) 15.03294' 7613' WOB Evermar 100% Gas In Air=10,000 UnitsConnection 157 3 3275' 160' Condition 3-4-BT-A-X-IN-ST-TD Bit # 2 12.25PDC 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.58 DOYON 15 Report For: Morning Report Report # 16 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 16-Apr-2015 12:00 AM Current Pump & Flow Data: 2100 Max 76 Wash down f/7,386'. Tag plug at 7,513'. Displaced f/LSND to 9.25 ppg FazePro OBM. Clean surface equip, Drill out Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Drill f/9,480' to 11,218' MD. Density (ppg) out (sec/qt) Viscosity 86 17-Apr-2015 12:00 AM Current Pump & Flow Data: 2300 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 17 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.82 DOYON 15 Report For: Condition 3-4-BT-A-X-IN-ST-TD Bit # 2 12.25PDC 9.40 Size 3 3275' 160' 100% Gas In Air=10,000 UnitsConnection 159 Tools Xceed675, PeriScope675, Telescope675 API FL Chromatograph (ppm) 15.03294' 7613' WOB Evermar 10.1810.47 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 13Background (max) Trip Average Mud Type Lst 100 Hydril 563 Type 180.0 PDC FazePro NA 7613' 10974'17 Depth in / out YP (lb/100ft2) 2.60 328259 00 Intermediate CementCht Silt C-4i C-4n 24 hr Max 68.0 Weight 303 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drill 8.75" Hole PV 4319' 8.75 0.902 Footage 57.40 M. Ross/O. Amend ShClyst TuffGvlCoal cP 13 40.0 Gas Summary 0 135 85 (current) Avg to7613' Yesterday's Depth: Current Depth: 24 Hour Progress: 457.9 Flow In (gpm) Flow In (spm) 9509' 11235' 1726' Max @ ft Current 10488'257.6 Date: Time: 528 in 6 9994'Minimum Depth C-5n 10270' 2.3 C-2 1201 SPP (psi) Gallons/stroke TFABit Type Depth 69/3145 L-80 Oil / Water Present Alkal 0.969 0 121 0 Siltst 16.00'' 500 118 Units* Casing Summary Lithology (%) 7378748 57 (907)685-0772Unit Phone: 43 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 178.9 X-65 Grade L-807598' 20.00'' 9.63'' (max)(current) BTC 529 0 Cly 140856 Lime Cor Solids (lb/bbl) % 3.38 7.8 . . * 24 hr Recap: Cor Solids (lb/bbl) % 3.38 8.1 632 0 Cly 249209Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 70764 13 (907)685-0772Unit Phone: 45 Greg Dellner 16.00'' 500 118 Units* Casing Summary Lithology (%) 10 178.9 X-65 Grade 110 0 Siltst 60 TFABit Type Depth 69/3145 L-80 Oil / Water Present Alkal 0.969 12098' 172.0 C-2 2298 in 6 12890'Minimum Depth C-5n 589 11235' 13085' 1850' Max @ ft Current 11605'270.6 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 424.8 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 128 83 (current) TuffGvlCoal cP 12 40.0 L-80 BTC 57.40 M. Ross/O. Amend ShClystSs Ratio C-1 C-5i AK-AM-0902267570 - - Drill 8.75" Hole PV 4319' 68.0 Weight 240 Hours C-3 Footage Intermediate CementCht Silt C-4i C-4n 2.60 317356 00 7613' 12604'16 Depth in / out YP (lb/100ft2) 8.75 0.902 Mud Type Lst 90 Hydril 563 Type PDC FazePro NA Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min 63Background Chromatograph (ppm) 15.03294' 7613' WOB Evermar Comments Surface 100% Gas In Air=10,000 UnitsConnection 159 3 3275' 160' Condition 3-4-BT-A-X-IN-ST-TD Bit # 2 12.25PDC 9.40 Size 180.0 96% Rig Activity: 11.04 DOYON 15 Report For: Tools Xceed675, PeriScope675, Telescope675 10.4810.73 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7613' Depth Morning Report Report # 18 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 18-Apr-2015 12:00 AM Current Pump & Flow Data: 2400 Max Conductor 65 0 Drill f/11,235 t/13085’ MD. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Drill f/13,085' to 13,738' MD. C/O top drive wash pipe. Drill to 14,858' MD. Work on top drive shot pin & back up Density (ppg) out (sec/qt) Viscosity 62 0 19-Apr-2015 12:00 AM Current Pump & Flow Data: 2700 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 19 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7613' 96% Rig Activity: 11.48 DOYON 15 Report For: Tools Xceed675, PeriScope675, Telescope675 10.7410.99 Bit # 2 12.25PDC 9.40 Size 3 3275' 160' 100% Gas In Air=10,000 UnitsConnection 180 Mud RPM ECD (ppg) ml/30min 48Background (max) Trip (max)(current) Average Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 15.0 0 7613' 14858'16 Depth in / out NA 3294' 7613' WOB 2.30 328059 Footage Intermediate CementCht Silt Condition 3-4-BT-A-X-IN-ST-TD180.0 Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drill 8.75" Hole PV 4319' M. Ross/O. Amend ShClyst 68.0 Weight TuffGvlCoal cP 13 40.0 L-80 BTC 57.40 Hours Gas Summary 0 154 94 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: 455.4 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 13085' 14925' 1840' Max @ ft Current 13553'293.5 Date: 594 251 0 in 6 13723'Minimum Depth C-5n 14578' 13.8 C-2 2136 TFABit Type Depth 70/3048 L-80 Oil / Water Present Alkal 0.969 0 Siltst 71 C-3 16.00'' 498 118 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 67011 57 (907)685-0772Unit Phone: 48 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 229587 C-4i C-4n Cor Solids (lb/bbl) % 2.99 9.0 704 141 . . * 24 hr Recap: Cor Solids (lb/bbl) % 3.38 9.0 608 89 0 Cly 194499 C-4i C-4n Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 56020 37 (907)685-0772Unit Phone: 24 Greg Dellner 16.00'' 500 118 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 Siltst 42 C-3 TFABit Type Depth 70/3045 L-80 Oil / Water Present Alkal 0.969 15578' 169.0 C-2 1785 in 8 15870'Minimum Depth C-5n 491 214 0 14925' 15979' 1054' Max @ ft Current 15831'248.3 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 427.0 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 87 51 (current) TuffGvlCoal cP 14 40.0 L-80 BTC 57.40 Hours M. Ross/O. Amend ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drill 8.75" Hole PV 4319' Footage Intermediate CementCht Silt Condition 3-4-BT-A-X-IN-ST-TD180.0 2.60 144328 0 7613' 15588'14 Depth in / out NA 3294' 7613' WOB YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 15.0 Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min 107Background 100% Gas In Air=10,000 UnitsConnection 129 3 3275' 160' Bit # 2 12.25PDC 9.40 Size 96% Rig Activity: 11.36 DOYON 15 Report For: Tools Xceed675, PeriScope675, Telescope675 10.6811.05 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7613' Depth Morning Report Report # 20 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 20-Apr-2015 12:00 AM Current Pump & Flow Data: 2700 Max Conductor 51 0 Drill f/14,930' to 15,885' MD/4,130' TVD. Daily FazePro loss: 41 bbls. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Cor Solids (lb/bbl) % 3.12 9.0 659 113 0 Cly 198052 C-4i C-4n Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 104424 55 (907)685-0772Unit Phone: 32 Greg Dellner 16.00'' 517 122 Units* Casing Summary Lithology (%) 10 178.9 X-65 Grade 0 Siltst 60 C-3 TFABit Type Depth 70/3047 L-80 Oil / Water Present Alkal 0.969 15578' - C-2 1793 in 6 15870'Minimum Depth C-5n 862 361 0 15979' 17418' 1439' Max @ ft Current 16369'254.9 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 398.3 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 110 70 (current) TuffGvlCoal cP 15 40.0 L-80 BTC 57.40 Hours J. Keener/O. Amend ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - BROOH PV 4319' Footage Intermediate CementCht Silt Condition 3-4-BT-A-X-IN-ST-TD180.0 2.40 216247 0 7613' 17418'15 Depth in / out NA 3294' 7613' WOB YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 15.0 Lst 90 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min Background 100% Gas In Air=10,000 UnitsConnection 147 3 3275' 160' Bit # 2 12.25PDC 9.40 Size 96% Rig Activity: 11.53 DOYON 15 Report For: Tools Xceed675, PeriScope675, Telescope675 11.0411.30 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7613' Depth Morning Report Report # 21 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 21-Apr-2015 12:00 AM Current Pump & Flow Data: 2900 Max Conductor 71 0 Drill f/15979' to 17418' MD/4132' TVD. BROOH f/17418' t/16912'. Daily FazePro loss: 34 bbls. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Cor Solids (lb/bbl) % 2.73 8.9 0 0 0 Cly 0 C-4i C-4n Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 0 (907)685-0772Unit Phone: 0 Greg Dellner 16.00'' 523 124 Units* Casing Summary Lithology (%) 10 178.9 X-65 Grade 0 Siltst 0 C-3 TFABit Type Depth 70/3046 L-80 Oil / Water Present Alkal 0.969 - C-2 30 in 5 -Minimum Depth C-5n 10 0 0 17418' 17418' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 0 0 (current) TuffGvlCoal cP 14 40.0 L-80 BTC 57.40 Hours J. Keener/O. Amend ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - BROOH PV 4319' Footage Intermediate CementCht Silt Condition 3-4-BT-A-X-IN-ST-TD180.0 2.10 000 0 7613' 17418'12 Depth in / out NA 3294' 7613' WOB YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 15.0 Lst 90 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min Background 100% Gas In Air=10,000 UnitsConnection 0 3 3275' 160' Bit # 2 12.25PDC 9.40 Size 96% Rig Activity: DOYON 15 Report For: Tools Xceed675, PeriScope675, Telescope675 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7613' Depth Morning Report Report # 22 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 22-Apr-2015 12:00 AM Current Pump & Flow Data: 2200 Max Conductor 0 0 BROOH f/16912' t/7693'. Daily FazePro loss: 97 bbls. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Cor Solids (lb/bbl) % 2.60 8.9 0 0 0 Cly 0 C-4i C-4n Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 0 (907)685-0772Unit Phone: 0 Greg Dellner 16.00'' Units* Casing Summary Lithology (%) 10 178.9 X-65 Grade 0 Siltst 0 C-3 TFABit Type Depth 70/3047 L-80 Oil / Water Present Alkal 0.969 - C-2 67 in 3 -Minimum Depth C-5n 9 0 0 17418' 17418' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 0 0 (current) TuffGvlCoal cP 15 40.0 L-80 BTC 57.40 Hours J. Keener/O. Amend ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - Cut drilling line PV 4319' Footage Intermediate CementCht Silt Condition 3-4-BT-A-X-IN-ST-TD180.0 2.00 000 0 7613' 17418'12 Depth in / out NA 3294' 7613' WOB YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 15.0 Lst 90 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min Background 100% Gas In Air=10,000 UnitsConnection 0 3 inspect/adjust brakes. Daily FazePro loss: 44 bbls. 3275' 160' Bit # 2 12.25PDC 9.40 Size 96% Rig Activity: DOYON 15 Report For: Tools None SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17418' Depth Morning Report Report # 23 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 23-Apr-2015 12:00 AM Current Pump & Flow Data: Max Conductor 0 0 BROOH f/7693' t/7482'. Encountered pack offs @7650' & 7604', perform clean up cycle at each, work BHA through Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Service crown, top drive, drawworks, inspect saver sub. R/U GBR 5.5" Volant. RIH w/5.5" slotted liner as per detail Density (ppg) out (sec/qt) Viscosity 0 0 24-Apr-2015 12:00 AM Current Pump & Flow Data: Max 2-3-CT-A-X-I-WT-TD Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 24 Customer: Well: Area: Location: Rig: SP04-SE5 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17418' 96% Rig Activity: DOYON 15 Report For: Tools None Bit # 2 12.25PDC 9.40 Size 3 tools f/9909' t/9963'. RIH w/5" DP f/9963' t/10149', filling every 20 stds. Daily FazePro loss: 5 bbls. 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min Background (max) Trip (max)(current) Average Lst 90 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 9805' Mud Type PDC FazePro 75 15.0 0 7613' 17418'12 17418' Depth in / out NA 3294' 7613' WOB 1.90 000 Footage 89.40 Intermediate CementCht Silt 194 Condition 3-4-BT-A-X-IN-ST-TD180.0 Ss Ratio C-1 C-5i AK-AM-0902267570 - - RIH w/liner PV 4319' J. Keener/O. Amend ShClyst 68.0 Weight TuffGvlCoal cP 16 40.0 L-80 BTC 57.40 Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 17418' 17418' 0' Max @ ft Current Date: -0 0 in --Minimum Depth C-5n - C-2 - TFABit Type Depth 70/3052 L-80 Oil / Water Present Alkal 0.969 0 Siltst 0 C-3 16.00'' Units* Casing Summary Lithology (%) 10 178.9 X-65 Grade 0 0 (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 0 C-4i C-4n Cor Solids (lb/bbl) % 2.47 8.9 0 0 . . * 24 hr Recap: Cor Solids (lb/bbl) % 2.73 8.9 0 0 0 Cly 0 C-4i C-4n Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 0 (907)685-0772Unit Phone: 0 Greg Dellner 16.00'' Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 Siltst 0 C-3 TFABit Type Depth 70/3049 L-80 Oil / Water Present Alkal 0.902 - C-2 - in --Minimum Depth C-5n -0 0 7395' 7395' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 0 0 (current) TuffGvlCoal cP 15 40.0 L-80 BTC 89.40 Hours J. Keener/O. Amend ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - RIH w/whipstock PV 9805' Footage Intermediate CementCht Silt Condition 2-3-CT-A-X-I-WT-TD194.0 2.10 000 0 7440' 17418'12 Depth in / out NA 7613' 17418' WOB YP (lb/100ft2) 8.5 1.243 Mud Type Mill FazePro 75.0 Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min Background 100% Gas In Air=10,000 UnitsConnection 0 4 Daily FazePro loss: 9 bbls. Clear rig floor, bring whipstock tools to floor. M/U whipstock/milling assy. RIH w/5"DP t/1555'. SHT as per SLB. RIH w/1555' 6690'. 3275' 160' Bit # 3 8.75PDC 9.40 Size 96% Rig Activity: DOYON 15 Report For: Tools None SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7395' Depth Morning Report Report # 25 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 25-Apr-2015 12:00 AM Current Pump & Flow Data: Max Conductor 0 0 RIH w/5" DP f/12764' t/17341'. Wash/rotate f/17341' t/17403', orient liner packer, set depth @7446'. Drop 1-3/4" ball Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:RIH w/whipstock f/6690' t/7437'. Orient and set whipstock, pressure up to verify release, no success. Re-orient Density (ppg) out (sec/qt) Viscosity 0 0 26-Apr-2015 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 26 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7395' 96% Rig Activity: DOYON 15 Report For: Tools None Bit # 3 8.75PDC 9.40 Size 4 26 bbls. @7411'. POOH f/7411' t/7191', no drag/swabbing. RIH t/7378'. 3 attempts to latch. POOH f/7403' t/95'. L/D BHA. Daily FazePro loss: w/retrieval hook f/95' t/3457', SHT @1585'. RIH w/retrieval hook f/3457' t/7378'. Orient hook, wash down, tag top @7406', latch on 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min Background (max) Trip (max)(current) Average Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.5 1.243 Mud Type Mill FazePro 75.0 0 7440' 17418'9 Depth in / out NA 7613' 17418' WOB 2.20 000 Footage Intermediate CementCht Silt Condition 2-3-CT-A-X-I-WT-TD194.0 Ss Ratio C-1 C-5i AK-AM-0902267570 - - L/D whipstock BHA PV 9805' J. Keener/O. Amend ShClyst 68.0 Weight TuffGvlCoal cP 17 40.0 L-80 BTC 89.40 Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 7395' 7395' 0' Max @ ft Current Date: 2 0 0 in 0 -Minimum Depth C-5n - C-2 4 TFABit Type Depth 68/3252 L-80 Oil / Water Present Alkal 0.902 0 Siltst 0 C-3 16.00'' Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 0 (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 0 C-4i C-4n Cor Solids (lb/bbl) % 2.86 8.8 0 0 . . * 24 hr Recap: Cor Solids (lb/bbl) % 3.12 8.8 0 0 0 Cly 0 C-4i C-4n Maximum Report By:Logging Engineers:Alexander Kalenuik/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 0 (907)685-0772Unit Phone: 0 Greg Dellner 16.00'' Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 Siltst 0 C-3 TFABit Type Depth 68/3252 L-80 Oil / Water Present Alkal 0.902 - C-2 4 in 0 -Minimum Depth C-5n 2 0 0 7395' 7395' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 0 0 (current) TuffGvlCoal cP 15 40.0 L-80 BTC 89.40 Hours J. Keener/O. Amend ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - Latch onto whipstock PV 9805' Footage Intermediate CementCht Silt Condition 2-3-CT-A-X-I-WT-TD194.0 2.40 000 0 7440' 17418'13 Depth in / out NA 7613' 17418' WOB YP (lb/100ft2) 8.5 1.243 Mud Type Mill FazePro 75.0 Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min Background 100% Gas In Air=10,000 UnitsConnection 0 4 up, hook slips out. retrieval hook, t/7379', SHT @1492'. Orient hook, wash down t/7411', attempt to latch up, hook slips out of key way. Attempt to latch 3275' 160' Bit # 3 8.75PDC 9.40 Size 96% Rig Activity: DOYON 15 Report For: Tools None SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7395' Depth Morning Report Report # 27 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 27-Apr-2015 12:00 AM Current Pump & Flow Data: Max Conductor 0 0 P/U MWD from shed. Clean rig floor. R/U & Wash stack. Drain stack, remove wear bushing, install test plug. Purge Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Attempt to latch whipstock, hook will not stay latched, decision made to POOH. POOH w/retrieval hook f/7411' t/95'. Density (ppg) out (sec/qt) Viscosity 0 0 28-Apr-2015 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 28 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7419' 96% Rig Activity: DOYON 15 Report For: Tools None Bit # 3 8.75PDC 9.40 Size floor. M/U clean out BHA t/62'. RIH w/clean out f/62' t/5758'. Daily FazePro loss: 14 bbls. 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min Background (max) Trip (max)(current) Average Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2)Mud Type FazePro 75.0 0 17418'13 Depth in / out NA 7613' 17418' WOB 2.40 000 Footage Intermediate CementCht Silt Condition 2-3-CT-A-X-I-WT-TD194.0 Ss Ratio C-1 C-5i AK-AM-0902267570 - - RIH w/clean out BHA PV 9805' J. Keener/O. Amend ShClyst 68.0 Weight TuffGvlCoal cP 15 40.0 L-80 BTC 89.40 Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 7419' 7419' 0' Max @ ft Current Date: 2 0 0 in 0 -Minimum Depth C-5n - C-2 4 TFABit Type Depth 68/3252 L-80 Oil / Water Present Alkal 0.902 0 Siltst 0 C-3 16.00'' Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 0 (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 0 C-4i C-4n Cor Solids (lb/bbl) % 3.12 8.8 0 0 . . * 24 hr Recap:RIH f/5758 t/7469'. Clean out liner top packer f/7450' t/7469'. POOH f/7469' t/0. Clean/prep BHA re-run. RIH f/0' Density (ppg) out (sec/qt) Viscosity 0 0 29-Apr-2015 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 29 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7419' 96% Rig Activity: DOYON 15 Report For: Tools Telescope 675 Bit # 3 8.75PDC 9.40 Size 4 washer, clean BOPE. Bring whipstock to floor. M/U Whipstock BHA. Daily FazePro loss: 14 bbls. 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min Background (max) Trip (max)(current) Average Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.5 1.534 Mud Type Mill FazePro 75.0 0 7419' 17418'12 Depth in / out NA 7613' 17418' WOB 2.30 000 Footage Intermediate CementCht Silt Condition 2-3-CT-A-X-I-WT-TD194.0 Ss Ratio C-1 C-5i AK-AM-0902267570 - - M/U Whipstock PV 9805' J. Keener/R. Wimmer ShClyst 68.0 Weight TuffGvlCoal cP 16 40.0 L-80 BTC 89.40 Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 7419' 7419' 0' Max @ ft Current Date: -0 0 in --Minimum Depth C-5n - C-2 - TFABit Type Depth 68/3253 L-80 Oil / Water Present Alkal 0.902 0 Siltst 0 C-3 16.00'' Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 0 (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 0 C-4i C-4n Cor Solids (lb/bbl) % 2.99 8.8 0 0 . . * 24 hr Recap: Cor Solids (lb/bbl) % 3.51 8.8 0 0 0 Cly 12 C-4i C-4n Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 7 0 (907)685-0772Unit Phone: 0 Greg Dellner 16.00'' 505 120 Units* Casing Summary Lithology (%) 30 178.9 X-65 Grade 0 Siltst 0 C-3 TFABit Type Depth 68/3253 L-80 Oil / Water Present Alkal 0.902 7450' - C-2 6 in 2 7445'Minimum Depth C-5n 5 0 0 7419' 7453' 34' Max @ ft Current 7450'7.0 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 60.6 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 0 0 (current) TuffGvlCoal cP 18 40.0 L-80 BTC 89.40 Hours J. Keener/R. Wimmer ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - POOH PV 9805' Footage Intermediate CementCht Silt Condition 2-3-CT-A-X-I-WT-TD194.0 2.70 000 0 7419' 7445'14 Depth in / out NA 7613' 17418' WOB YP (lb/100ft2) 8.5 1.534 Mud Type Mill FazePro 75.0 Lst 70 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min 1Background 100% Gas In Air=10,000 UnitsConnection 0 4 abnormal detected. POOH with milling BHA f/7453' t/7100'. 3275' 160' Bit # 3 8.75PDC 9.45 Size 96% Rig Activity: 10.07 DOYON 15 Report For: Tools Telescope 675 10.0710.07 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7419' Depth Morning Report Report # 30 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 30-Apr-2015 12:00 AM Current Pump & Flow Data: 1400 Max Conductor 0 0 P/U 12 jts HWDP and rack back. M/U Whipstock BHA t/164'. RIH f/164' t/7350'. Perform directional work, orient and Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:POOH w/milling assy f/7100' t/107'. L/D BHA. Clean/clear rig floor. Function test all rams, R/U & clean stack. B/D top Density (ppg) out (sec/qt) Viscosity 0 0 1-May-2015 12:00 AM Current Pump & Flow Data: 1600 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 31 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7453' 96% Rig Activity: 10.74 DOYON 15 Report For: Tools Xceed675, EcoScope, Telescope 675 10.0710.30 Bit # 4 8.5Mill 9.45 Size 5 @13.0ppg. R/D test equip. Wash down f/7390' t/7450'. Drilling f/7453' t/7686' MD Daily FazePro loss: 13 bbls. 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min 10Background (max) Trip (max)(current) Average Lst 30 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 0 7453' 7580'16 Depth in / out NA 7419' 7453' WOB 2.80 000 Footage Intermediate CementCht Silt Condition Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drilling 8.75" Hole PV 34' J. Keener/R. Wimmer ShClyst 68.0 Weight 50 TuffGvlCoal cP 17 40.0 L-80 BTC Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: 119.4 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 7453' 7686' 233' Max @ ft Current 7469'50.9 Date: 17 0 0 in 8 7646'Minimum Depth C-5n 7670' 35.0 C-2 21 TFABit Type Depth 68/3256 L-80 Oil / Water Present Alkal 1.534 0 Siltst 0 C-3 16.00'' 423 100 Units* Casing Summary Lithology (%) 20 178.9 X-65 Grade 2859 36 (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 3094 C-4i C-4n Cor Solids (lb/bbl) % 3.64 8.8 0 0 . . * 24 hr Recap: Cor Solids (lb/bbl) % 3.12 8.9 588 123 0 Cly 256525 C-4i C-4n Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 66845 76 (907)685-0772Unit Phone: 46 Greg Dellner 16.00'' 550 130 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 Siltst 47 C-3 TFABit Type Depth 68/3253 L-80 Oil / Water Present Alkal 1.534 7911' 141.0 C-2 2104 in 5 9046'Minimum Depth C-5n 627 235 0 7686' 10192' 2506' Max @ ft Current 9170'243.7 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 412.8 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 141 91 (current) TuffGvlCoal cP 19 40.0 L-80 BTC Hours J. Keener/R. Wimmer ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drilling 8.75" Hole PV 34' Footage Intermediate CementCht Silt Condition 2.40 165135 0 7453' 9858'17 Depth in / out NA 7419' 7453' WOB YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min 36Background 100% Gas In Air=10,000 UnitsConnection 146 5 3275' 160' Bit # 4 8.5Mill 9.45 Size 96% Rig Activity: 11.14 DOYON 15 Report For: Tools Xceed675, EcoScope, Telescope 675 10.2410.90 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7453' Depth Morning Report Report # 32 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 2-May-2015 12:00 AM Current Pump & Flow Data: 2700 Max Conductor 63 0 Drill f/7686' t/10192'. Daily FazePro loss: 0 bbls Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Drill f/10192’ t/12246’. Daily FazePro loss: 15 bbls. Density (ppg) out (sec/qt) Viscosity 71 0 3-May-2015 12:00 AM Current Pump & Flow Data: 2800 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 33 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7453' 96% Rig Activity: 11.32 DOYON 15 Report For: Tools Xceed675, EcoScope, Telescope 675 10.7011.07 Bit # 4 8.5Mill 9.50 Size 5 3275' 160' 100% Gas In Air=10,000 UnitsConnection 127 Mud RPM ECD (ppg) ml/30min 60Background (max) Trip (max)(current) Average Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 0 7453' 12070'18 Depth in / out NA 7419' 7453' WOB 2.40 348162 Footage Intermediate CementCht Silt Condition Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drilling 8.75" Hole PV 34' J. Keener/R. Wimmer ShClyst 68.0 Weight TuffGvlCoal cP 16 40.0 L-80 BTC Hours Gas Summary 0 112 82 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: 398.5 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 10192' 12246' 2054' Max @ ft Current 11968'253.4 Date: 553 228 0 in 6 11614'Minimum Depth C-5n 11178' 160.0 C-2 1469 TFABit Type Depth 68/3251 L-80 Oil / Water Present Alkal 1.534 0 Siltst 69 C-3 16.00'' 552 131 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 58795 32 (907)685-0772Unit Phone: 44 Greg Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 179323 C-4i C-4n Cor Solids (lb/bbl) % 3.12 9.6 488 96 . . * 24 hr Recap: Cor Solids (lb/bbl) % 3.12 9.0 536 84 0 Cly 210704 C-4i C-4n Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 85129 72 (907)685-0772Unit Phone: 35 Greg Dellner 16.00'' 544 129 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 Siltst 75 C-3 TFABit Type Depth 68/3252 L-80 Oil / Water Present Alkal 1.534 12320' 178.0 C-2 1792 in 5 12644'Minimum Depth C-5n 774 307 0 12246' 14705' 2459' Max @ ft Current 13319'270.2 Date: Yesterday's Depth: Current Depth: 24 Hour Progress: 386.3 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 93 64 (current) TuffGvlCoal cP 16 40.0 L-80 BTC Hours J. Keener/R. Wimmer ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drilling 8.75" Hole PV 29' Footage Intermediate CementCht Silt Condition 2.40 328559 0 7453' 14363'19 Depth in / out NA 7424' 7453' WOB YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min 60Background 100% Gas In Air=10,000 UnitsConnection 127 5 3275' 160' Bit # 4 8.5Mill 9.50 Size 96% Rig Activity: 11.44 DOYON 15 Report For: Tools Xceed675, EcoScope, Telescope 675 10.9211.19 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7453' Depth Morning Report Report # 34 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 4-May-2015 12:00 AM Current Pump & Flow Data: 3000 Max Conductor 85 0 Drill f/12246’ t/14705’. Daily FazePro loss: 55 bbls. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Drill f/14705’ t/16900’. Daily FazePro loss: 97 bbls. Density (ppg) out (sec/qt) Viscosity 73 0 5-May-2015 12:00 AM Current Pump & Flow Data: 3400 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 35 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7453' 96% Rig Activity: 11.82 DOYON 15 Report For: Tools Xceed675, EcoScope, Telescope 675 11.1211.49 Bit # 4 8.5Mill 9.45 Size 5 3275' 160' 100% Gas In Air=10,000 UnitsConnection 143 Mud RPM ECD (ppg) ml/30min 96Background (max) Trip (max)(current) Average Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 0 7453' 16674'16 Depth in / out NA 7424' 7453' WOB 2.20 277053 Footage Intermediate CementCht Silt Condition Ss Ratio C-1 C-5i AK-AM-0902267570 - - Drilling 8.75" Hole PV 29' B. Simonson/R. Wimmer ShClyst 68.0 Weight TuffGvlCoal cP 17 40.0 L-80 BTC Hours Gas Summary 0 110 76 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: 474.7 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 14705' 16900' 2195' Max @ ft Current 15329'247.1 Date: 813 313 0 in 6 16452'Minimum Depth C-5n 16233' 4.8 C-2 1872 TFABit Type Depth 68/3252 L-80 Oil / Water Present Alkal 1.534 0 Siltst 66 C-3 16.00'' 550 130 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 90819 32 (907)685-0772Unit Phone: 36 Greg Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 222049 C-4i C-4n Cor Solids (lb/bbl) % 2.86 9.0 700 107 . . * 24 hr Recap:Drill f/16,900' to TD at 17,420' MD/4,105' TVD. CBU x 1 per std to 17,383'. BROOH from 16,544' to 11,502'. Daily Density (ppg) out (sec/qt) Viscosity 45 0 6-May-2015 12:00 AM Current Pump & Flow Data: 2800 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 36 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7453' 96% Rig Activity: 11.85 DOYON 15 Report For: Tools Xceed675, EcoScope, Telescope 675 11.5111.71 Bit # 4 8.5Mill 9.45 Size 5 3275' 160' 100% Gas In Air=10,000 UnitsConnection 102 Mud RPM ECD (ppg) ml/30min Background (max) Trip (max)(current) Average Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro 0 7453' 17420'18 Depth in / out NA 7424' 7453' WOB 2.20 184538 Footage Intermediate CementCht Silt Condition Ss Ratio C-1 C-5i AK-AM-0902267570 - - BROOH PV 29' B. Simonson/R. Wimmer ShClyst 68.0 Weight TuffGvlCoal cP 15 40.0 L-80 BTC Hours Gas Summary 0 81 59 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: 344.9 Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 16900' 17420' 520' Max @ ft Current 17395'241.1 Date: 314 232 0 in 5 17260'Minimum Depth C-5n 17420' - C-2 1386 TFABit Type Depth 68/3253 L-80 Oil / Water Present Alkal 1.534 0 Siltst 43 C-3 16.00'' 550 130 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 64415 32 (907)685-0772Unit Phone: 29 Greg Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 168131 C-4i C-4n Cor Solids (lb/bbl) % 2.86 9.1 558 80 . . * 24 hr Recap: Cor Solids (lb/bbl) % 2.86 9.6 0 0 0 Cly 0 C-4i C-4n Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 0 (907)685-0772Unit Phone: 0 Greg Dellner 16.00'' 550 130 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 Siltst 0 C-3 TFABit Type Depth 69/3151 L-80 Oil / Water Present Alkal 1.534 - C-2 37 in 3 -Minimum Depth C-5n 10 0 0 17420' 17420' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 0 0 (current) TuffGvlCoal cP 16 40.0 L-80 BTC Hours B. Simonson/R. Wimmer ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - Circulate Hole PV 29' Footage Intermediate CementCht Silt Condition 2.20 000 0 7453' 17420'16 Depth in / out NA 7424' 7453' WOB YP (lb/100ft2) 8.75 0.902 Mud Type PDC FazePro Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min Background 100% Gas In Air=10,000 UnitsConnection 0 5 74 bbls. 3275' 160' Bit # 4 8.5Mill 9.60 Size 96% Rig Activity: DOYON 15 Report For: Tools Xceed675, EcoScope, Telescope 675 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to7453' Depth Morning Report Report # 37 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 7-May-2015 12:00 AM Current Pump & Flow Data: 2200 Max Conductor 0 0 BROOH f/11,502' to 7,803'. Work thru window to 7,393'. CBU x 3 to 7,295'. Wt up f/9.5 ppg to 9.6 ppg while circ. C/O to Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Circ at 6,440'. C/O saver sub & service rig. BROOH to 1,222’. POH 4.5" DP to 366'. Clean rig floor. L/D BHA #11. Density (ppg) out (sec/qt) Viscosity 0 0 8-May-2015 12:00 AM Current Pump & Flow Data: Max 1-2-WT-T-X-IN-NO-TD Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 38 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17420' 96% Rig Activity: DOYON 15 Report For: Tools Telescope 675 Bit # 4 8.5Mill 9.60 Size 5 needed. Daily FazePro loss: 26 bbls. 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min Background (max) Trip (max)(current) Average Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 9967' Mud Type PDC FazePro 10 0 7453' 17420'15 17420' Depth in / out NA 7424' 7453' WOB 2.20 000 Footage 68.90 Intermediate CementCht Silt 120 Condition Ss Ratio C-1 C-5i AK-AM-0902267570 - - RIH Retrieval Tool PV 29' B. Simonson/R. Wimmer ShClyst 68.0 Weight TuffGvlCoal cP 15 40.0 L-80 BTC Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 17420' 17420' 0' Max @ ft Current Date: -0 0 in --Minimum Depth C-5n - C-2 - TFABit Type Depth 68/3253 L-80 Oil / Water Present Alkal 1.534 0 Siltst 0 C-3 16.00'' Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 0 (907)685-0772Unit Phone: 0 Greg Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 Cly 0 C-4i C-4n Cor Solids (lb/bbl) % 2.86 10.0 0 0 . . * 24 hr Recap: Cor Solids (lb/bbl) % 2.86 9.2 0 0 0 Cly 0 C-4i C-4n Maximum Report By:Logging Engineers:Kori Jo Plowman/Greg Dellner Set AtSize 7598' 20.00'' 9.63'' 0 0 (907)685-0772Unit Phone: 0 Greg Dellner 16.00'' 210 50 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 Siltst 0 C-3 TFABit Type Depth 68/3252 L-80 Oil / Water Present Alkal 1.534 - C-2 4 in 1 -Minimum Depth C-5n 2 0 0 17420' 17420' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 0 0 (current) TuffGvlCoal cP 14 40.0 L-80 BTC Hours B. Simonson/R. Wimmer ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 - - Circulate Hole PV 29' Footage 68.90 Intermediate CementCht Silt 120 Condition 2.20 000 0 7453' 17420'15 17420' Depth in / out NA 7424' 7453' WOB YP (lb/100ft2) 8.75 0.902 9967' Mud Type PDC FazePro 10 Lst 100 Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max) Trip (max)(current) Mud RPM ECD (ppg) ml/30min Background 100% Gas In Air=10,000 UnitsConnection 0 5 to 7,440'. Circulate. Daily FazePro loss: 136 bbls. 3275' 160' Bit # 4 8.5Mill 9.50 Size 96% Rig Activity: DOYON 15 Report For: Tools Telescope 675 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17420' Depth Morning Report Report # 39 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 9-May-2015 12:00 AM Current Pump & Flow Data: 500 Max 1-2-WT-T-X-IN-NO-TD Conductor 0 0 RIH retrieval tool f/5,628' to 7,213'. Cut & slip drill line. RIH to 7,311'. Wash down to 7,417'. Latch onto whipstock. P/U Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Circulate at 7,309' MD to obtain 9.4 ppg in and out. Monitor well - static. Pull out of hole to 124' MD. Lay down Density (ppg) out (sec/qt) Viscosity 0 0 10-May-2015 12:00 AM Current Pump & Flow Data: 688 Max 1-2-WT-T-X-IN-NO-TD Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 40 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17420' 96% Rig Activity: DOYON 15 Report For: Tools Telescope 675 Bit # 4 8.5Mill 9.45 Size 5 to 5,278' MD. Daily FazePro loss: 22 bbls. Rig up GBR equipment. Make up seal bore diverter BHA. Shallow test MWD - ok. Test release on seal bore - ok. Run in hole 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min Background (max)Trip (max)(current) Average Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 9967' Mud Type PDC FazePro 10 0 7453' 17420'14 17420' Depth in / out NA 7424' 7453' WOB 2.10 000 Footage 68.90 Intermediate CementChtSilt 120 Condition Ss Ratio C-1 C-5i AK-AM-0902267570 RIH Seal Bore PV 29' B. Simonson/R. Wimmer ShClyst 68.0 Weight TuffGvlCoal cP 14 40.0 L-80 BTC Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 17420' 17420' 0' Max @ ft Current Date: cleanout BHA. Pull wear ring and set test plug. Rig up and test BOPE's. Monitor hole while testing. Rig down test equipment. 4 0 0 in 2 -Minimum Depth C-5n - C-2 38 TFABit Type Depth 68/3253 L-80 Oil / Water Present Alkal 1.534 0 Siltst 0 C-3 16.00'' 0 0 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 0 (907)685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva Set AtSize 7598' 20.00'' 9.63'' 0 Cly 0 C-4i C-4n Cor Solids (lb/bbl)% 2.73 9.1 0 0 . . * 24 hr Recap: Cor Solids (lb/bbl)% 2.73 9.2 0 0 0 Cly 0 C-4i C-4n Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva Set AtSize 7598' 20.00'' 9.63'' 0 0 (907)685-0772Unit Phone: 0 Chris Silva 16.00'' 0 0 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 Siltst 0 C-3 TFABit Type Depth 68/3254 L-80 Oil / Water Present Alkal 1.534 - C-2 8 in 2 -Minimum Depth C-5n drift. Pull out of hole to 54' MD. Recover drift. Lay down tool and MWD. Rig up volant and 5.5" liner equipment. Run 5.5" liner to 4 0 0 17420' 17420' 0' Max @ ft Current Date: Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke Gas Summary 0 0 0 (current) TuffGvlCoal cP 14 40.0 L-80 BTC Hours B. Simonson/R. Wimmer ShClyst 68.0 Weight Ss Ratio C-1 C-5i AK-AM-0902267570 Make Up Hanger PV 29' Footage 68.90 Intermediate CementChtSilt 120 Condition 2.10 000 0 7453' 17420'15 17420' Depth in / out NA 7424' 7453' WOB YP (lb/100ft2) 8.75 0.902 9967' Mud Type PDC FazePro 10 Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface Average (max)Trip (max)(current) Mud RPM ECD (ppg) ml/30min Background 100% Gas In Air=10,000 UnitsConnection 0 5 9,959' MD. Pick up hanger. Daily FazePro loss: 10 bbls. 3275' 160' Bit # 4 8.5Mill 9.45 Size 96% Rig Activity: DOYON 15 Report For: Tools Telescope 675 SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17420' Depth Morning Report Report # 41 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime 11-May-2015 12:00 AM Current Pump & Flow Data: 12 Max 1-2-WT-T-X-IN-NO-TD Conductor 0 0 Run in hole with seal bore from 5,728' MD to 7,408' MD. Work seals into seal bore. Pump to release run tool. Drop Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Run in hole with 5.5" liner from 10,007' MD to 17,921' MD. Latch hanger to ram seal assembly. Pump ball. Release Density (ppg) out (sec/qt) Viscosity 0 0 12-May-2015 12:00 AM Current Pump & Flow Data: 1143 Max 1-2-WT-T-X-IN-NO-TD Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 42 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17420' 96% Rig Activity: DOYON 15 Report For: Tools Telescope 675 Bit # 4 8.5Mill 9.45 Size 5 to 7,298' MD. Wash down to 7,392' MD at 2 bpm to orient LEM. Daily FazePro loss: 16 bbls. 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min Background (max)Trip (max)(current) Average Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 9967' Mud Type PDC FazePro 10 0 7453' 17420'15 17420' Depth in / out NA 7424' 7453' WOB 2.10 000 Footage 68.90 Intermediate CementChtSilt 120 Condition Ss Ratio C-1 C-5i AK-AM-0902267570 Circ. To Orient MWD PV 29' B. Simonson/O. Amend ShClyst 68.0 Weight TuffGvlCoal cP 14 40.0 L-80 BTC Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 17420' 17420' 0' Max @ ft Current Date: tool. Pull out of hole to 126' MD. Lay down run tool and inner string. Pick up tools. Make up LEM assembly and MWD. Run in hole 5 0 0 in 2 -Minimum Depth C-5n - C-2 35 TFABit Type Depth 68/3254 L-80 Oil / Water Present Alkal 1.534 0 Siltst 0 C-3 16.00'' 0 0 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 0 (907)685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva Set AtSize 7598' 20.00'' 9.63'' 0 Cly 0 C-4i C-4n Cor Solids (lb/bbl)% 2.73 9.2 0 0 . . * 24 hr Recap:Set LEM and orient. Set packer and test. Displace FazePro with KCl/NaCl brine. Cut and slip drill line. Lay down Density (ppg) out (sec/qt) Viscosity 0 0 13-May-2015 12:00 AM Current Pump & Flow Data: 12 Max 1-2-WT-T-X-IN-NO-TD Conductor ROP ROP (ft/hr) 4.23 @ Mud Data API FL Avg Min Lime Depth Morning Report Report # 43 Customer: Well: Area: Location: Rig: SP04-SE5 L1 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 24 hr MaxAvg to17420' 96% Rig Activity: DOYON 15 Report For: Tools Telescope 675 Bit # 4 8.5Mill 9.40 Size 5 3275' 160' 100% Gas In Air=10,000 UnitsConnection 0 Mud RPM ECD (ppg) ml/30min Background (max)Trip (max)(current) Average Lst Hydril 563 Type Chromatograph (ppm) Evermar Comments Surface YP (lb/100ft2) 8.75 0.902 9967' Mud Type PDC Brine 10 0 7453' 17420' 17420' Depth in / out 7424' 7453' WOB 000 Footage 68.90 Intermediate CementChtSilt 120 Condition Ss Ratio C-1 C-5i AK-AM-0902267570 Clean Rig Floor PV 29' B. Simonson/O. Amend ShClyst 68.0 Weight TuffGvlCoal cP 40.0 L-80 BTC Hours Gas Summary 0 0 0 (current) Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Time: SPP (psi) Gallons/stroke 17420' 17420' 0' Max @ ft Current Date: 5" drill pipe. Daily brine loss : 17 bbls. 4 0 0 in 2 -Minimum Depth C-5n - C-2 10 TFABit Type Depth 28 L-80 Oil / Water Present Alkal 1.534 0 Siltst 0 C-3 16.00'' 0 0 Units* Casing Summary Lithology (%) 178.9 X-65 Grade 0 0 (907)685-0772Unit Phone: 0 Chris Silva Maximum Report By:Logging Engineers:Kori Jo Plowman/Chris Silva Set AtSize 7598' 20.00'' 9.63'' 0 Cly 0 C-4i C-4n Cor Solids (lb/bbl)% 0 0 WELL INFORMATION Created On : Jun 09 2015 Customer :ENI Petroleum Well Name :SP04-SE5 Job Number :AK-XX-0902267570 Rig Name :Doyon 15 Field Name :Nikaitchuq Country :USA Survey Report SURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 350.00 0.00 0.00 N 0.00 E 0.00 0.00 40.80 0.00 350.00 40.80 0.00 N 0.00 E 0.00 0.00 121.53 0.79 327.77 121.53 0.47 N 0.30 W -0.51 0.98 161.04 0.81 330.30 161.03 0.94 N 0.58 W -1.02 0.10 254.04 0.23 345.81 254.03 1.70 N 0.95 W -1.75 0.64 346.64 1.19 1.70 346.62 2.84 N 0.97 W -2.42 1.05 404.84 1.09 356.44 404.81 3.99 N 0.99 W -3.10 0.25 453.02 2.10 352.54 452.97 5.33 N 1.13 W -3.98 2.11 545.54 3.81 351.44 545.36 10.05 N 1.81 W -7.24 1.85 638.50 6.61 351.42 637.93 18.39 N 3.06 W -13.06 3.01 731.55 11.37 353.82 729.81 32.82 N 4.85 W -22.80 5.13 789.95 15.01 354.53 786.66 46.07 N 6.19 W -31.50 6.24 883.33 19.34 351.42 875.86 73.41 N 9.65 W -50.02 4.74 976.78 22.34 350.83 963.18 106.25 N 14.79 W -73.06 3.22 1070.14 26.23 350.05 1,048.27 144.11 N 21.19 W -100.01 4.18 1163.54 29.46 351.17 1,130.84 187.14 N 28.28 W -130.51 3.50 1257.02 29.86 351.16 1,212.07 232.85 N 35.39 W -162.55 0.43 1350.27 35.11 350.79 1,290.71 282.30 N 43.25 W -197.35 5.63 1443.61 40.48 352.57 1,364.44 338.88 N 51.47 W -236.54 5.87 1537.02 39.46 353.29 1,436.03 398.42 N 58.86 W -276.74 1.20 1630.45 40.00 351.87 1,507.88 457.64 N 66.58 W -317.03 1.13 1723.90 39.88 351.26 1,579.53 516.98 N 75.38 W -358.28 0.44 1817.29 41.21 350.38 1,650.50 576.91 N 85.07 W -400.59 1.55 1910.65 40.13 351.15 1,721.31 636.96 N 94.84 W -443.03 1.28 2004.06 42.24 348.48 1,791.61 697.48 N 105.74 W -486.68 2.94 2097.45 43.56 348.27 1,860.02 759.75 N 118.55 W -532.89 1.42 2190.74 44.51 348.40 1,927.09 823.25 N 131.66 W -580.05 1.02 2283.99 45.35 348.79 1,993.10 887.81 N 144.68 W -627.74 0.95 2377.32 50.78 347.15 2,055.45 955.67 N 159.19 W -678.55 5.96 2470.68 51.94 348.19 2,113.75 1,026.91 N 174.76 W -732.16 1.52 INSITE V8.1.10 Page 1Job No:AK-XX-0902267570 Well Name:SP04-SE5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2564.07 56.20 348.84 2,168.54 1,101.00 N 189.80 W -786.98 4.60 2657.50 59.44 347.49 2,218.29 1,178.38 N 206.03 W -844.66 3.68 2750.88 62.84 347.16 2,263.36 1,258.16 N 223.98 W -905.12 3.65 2844.21 61.49 347.41 2,306.94 1,338.67 N 242.14 W -966.18 1.47 2937.60 64.77 346.69 2,349.14 1,419.84 N 260.82 W -1028.03 3.58 3030.99 63.51 346.42 2,389.87 1,501.57 N 280.35 W -1090.92 1.37 3124.36 68.23 346.10 2,428.03 1,584.32 N 300.59 W -1154.96 5.06 3212.83 67.07 346.84 2,461.67 1,663.87 N 319.74 W -1216.27 1.52 3294.00 64.50 346.84 2,494.96 1,735.95 N 336.59 W -1271.42 3.17 3311.19 64.94 349.10 2,502.31 1,751.15 N 339.83 W -1282.79 12.16 3386.16 61.01 352.07 2,536.37 1,817.01 N 350.78 W -1329.53 6.32 3479.53 58.62 355.80 2,583.33 1,897.23 N 359.34 W -1382.56 4.30 3572.86 58.26 357.19 2,632.18 1,976.61 N 364.20 W -1432.07 1.33 3666.27 58.61 359.59 2,681.08 2,056.16 N 366.43 W -1479.53 2.22 3759.62 58.94 0.04 2,729.47 2,135.98 N 366.69 W -1525.52 0.54 3852.85 58.71 2.17 2,777.73 2,215.73 N 365.15 W -1570.01 1.97 3946.15 58.07 3.66 2,826.64 2,295.08 N 361.12 W -1612.21 1.52 4039.63 55.37 6.50 2,877.94 2,372.90 N 354.23 W -1651.21 3.85 4132.93 52.73 11.29 2,932.73 2,447.49 N 342.61 W -1684.47 5.03 4226.21 51.38 16.36 2,990.11 2,518.88 N 325.07 W -1711.05 4.52 4319.65 51.65 22.67 3,048.29 2,587.76 N 300.65 W -1730.56 5.29 4412.95 52.85 29.91 3,105.46 2,653.81 N 267.98 W -1741.68 6.27 4506.31 54.07 35.00 3,161.07 2,717.05 N 227.73 W -1744.98 4.57 4599.71 55.56 41.84 3,214.93 2,776.77 N 180.31 W -1740.39 6.19 4693.04 56.48 46.60 3,267.11 2,832.20 N 126.35 W -1727.98 4.34 4786.33 56.10 52.36 3,318.91 2,882.59 N 67.40 W -1708.60 5.15 4879.64 56.71 58.60 3,370.58 2,926.59 N 3.40 W -1681.41 5.61 4973.03 57.28 60.34 3,421.45 2,966.37 N 64.05 E -1648.97 1.68 5066.44 56.32 62.51 3,472.60 3,003.75 N 132.68 E -1614.19 2.20 5159.82 57.01 64.83 3,523.92 3,038.35 N 202.60 E -1576.76 2.20 5252.99 58.35 69.14 3,573.75 3,069.10 N 275.05 E -1535.05 4.17 5346.34 59.24 69.91 3,622.12 3,097.03 N 349.85 E -1489.80 1.19 5439.70 59.98 71.78 3,669.35 3,123.44 N 425.92 E -1442.64 1.90 5533.16 61.46 75.68 3,715.07 3,146.26 N 504.16 E -1391.64 3.97 5626.52 63.72 79.18 3,758.06 3,164.26 N 585.03 E -1335.72 4.11 5719.73 66.60 82.61 3,797.22 3,177.61 N 668.53 E -1274.98 4.55 5813.16 67.96 85.16 3,833.31 3,186.78 N 754.21 E -1210.05 2.91 5906.59 69.56 88.67 3,867.16 3,191.46 N 841.15 E -1141.52 3.90 5999.97 71.10 91.54 3,898.60 3,191.28 N 929.06 E -1069.40 3.33 6093.39 73.25 94.37 3,927.20 3,186.69 N 1,017.86 E -994.02 3.69 6186.70 74.37 95.76 3,953.22 3,178.77 N 1,107.12 E -916.37 1.87 6222.49 74.15 96.31 3,962.93 3,175.15 N 1,141.38 E -886.23 1.60 6253.45 75.06 97.77 3,971.15 3,171.49 N 1,171.00 E -859.87 5.41 6280.66 75.51 98.67 3,978.06 3,167.73 N 1,197.05 E -836.37 3.60 6313.28 76.35 100.09 3,985.99 3,162.57 N 1,228.26 E -807.84 4.95 INSITE V8.1.10 Page 2Job No:AK-XX-0902267570 Well Name:SP04-SE5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6345.00 77.23 101.10 3,993.24 3,156.89 N 1,258.62 E -779.72 4.16 6373.49 77.79 101.69 3,999.40 3,151.40 N 1,285.88 E -754.23 2.82 6407.45 78.54 102.67 4,006.36 3,144.39 N 1,318.37 E -723.60 3.59 6438.23 78.99 103.17 4,012.36 3,137.63 N 1,347.80 E -695.62 2.16 6466.81 79.50 103.78 4,017.70 3,131.09 N 1,375.10 E -669.50 2.75 6532.06 81.70 105.57 4,028.35 3,114.78 N 1,437.37 E -609.14 4.32 6560.13 82.72 106.39 4,032.16 3,107.13 N 1,464.11 E -582.85 4.65 6653.52 85.61 109.15 4,041.65 3,078.77 N 1,552.56 E -494.13 4.27 6746.77 87.48 110.52 4,047.27 3,047.19 N 1,640.11 E -404.29 2.48 6840.09 86.88 112.34 4,051.86 3,013.14 N 1,726.87 E -313.69 2.05 6933.35 87.08 115.22 4,056.78 2,975.59 N 1,812.09 E -222.35 3.09 7026.78 88.24 118.13 4,060.59 2,933.68 N 1,895.49 E -130.00 3.35 7119.83 87.14 119.96 4,064.34 2,888.55 N 1,976.77 E -37.53 2.29 7213.17 86.61 122.03 4,069.43 2,840.56 N 2,056.66 E 55.44 2.29 7306.51 86.24 124.93 4,075.25 2,789.17 N 2,134.35 E 148.56 3.13 7399.91 86.15 127.42 4,081.45 2,734.17 N 2,209.57 E 241.72 2.66 7493.34 85.54 128.62 4,088.22 2,676.77 N 2,282.98 E 334.78 1.44 7568.56 86.29 129.81 4,093.58 2,629.34 N 2,341.11 E 409.60 1.87 7613.00 86.29 129.81 4,096.46 2,600.95 N 2,375.18 E 453.79 0.00 7694.40 86.03 126.41 4,101.91 2,550.83 N 2,439.07 E 534.88 4.18 7787.75 85.61 127.85 4,108.72 2,494.63 N 2,513.30 E 627.91 1.60 7881.18 86.58 128.53 4,115.08 2,437.00 N 2,586.56 E 720.98 1.27 7974.51 87.46 129.73 4,119.93 2,378.18 N 2,658.85 E 813.94 1.59 8067.80 88.86 131.50 4,122.93 2,317.49 N 2,729.63 E 906.72 2.42 8161.09 89.30 129.78 4,124.42 2,256.74 N 2,800.41 E 999.55 1.90 8254.44 89.56 129.52 4,125.35 2,197.18 N 2,872.28 E 1092.59 0.39 8347.90 88.58 128.91 4,126.87 2,138.10 N 2,944.68 E 1185.78 1.24 8441.22 87.73 129.68 4,129.87 2,079.03 N 3,016.86 E 1278.79 1.23 8534.57 89.98 129.83 4,131.74 2,019.35 N 3,088.61 E 1371.79 2.42 8627.98 90.81 130.25 4,131.10 1,959.26 N 3,160.12 E 1464.84 1.00 8721.43 91.70 129.29 4,129.05 1,899.49 N 3,231.93 E 1557.94 1.40 8814.85 91.32 127.18 4,126.59 1,841.70 N 3,305.28 E 1651.17 2.29 8908.25 88.87 123.40 4,126.43 1,787.75 N 3,381.49 E 1744.55 4.82 9001.61 89.50 124.82 4,127.76 1,735.40 N 3,458.78 E 1837.88 1.66 9095.01 89.75 124.49 4,128.37 1,682.30 N 3,535.61 E 1931.28 0.44 9188.31 90.50 124.47 4,128.17 1,629.48 N 3,612.52 E 2024.57 0.80 9281.79 89.82 123.22 4,127.91 1,577.42 N 3,690.16 E 2118.03 1.52 9375.21 89.16 123.23 4,128.74 1,526.23 N 3,768.30 E 2211.40 0.71 9468.59 90.09 124.34 4,129.35 1,474.31 N 3,845.91 E 2304.76 1.55 9562.03 91.53 125.23 4,128.03 1,421.01 N 3,922.64 E 2398.18 1.81 9655.43 89.05 124.29 4,127.56 1,367.76 N 3,999.37 E 2491.57 2.84 9748.80 89.02 124.64 4,129.13 1,314.93 N 4,076.34 E 2584.93 0.38 9842.24 90.45 126.21 4,129.56 1,260.77 N 4,152.47 E 2678.36 2.27 9935.74 86.82 125.26 4,131.79 1,206.19 N 4,228.33 E 2771.81 4.01 10029.17 87.41 126.94 4,136.49 1,151.21 N 4,303.72 E 2865.10 1.90 INSITE V8.1.10 Page 3Job No:AK-XX-0902267570 Well Name:SP04-SE5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10122.55 86.70 126.74 4,141.29 1,095.30 N 4,378.36 E 2958.31 0.79 10215.91 89.20 128.18 4,144.63 1,038.56 N 4,452.41 E 3051.51 3.09 10309.35 89.47 127.07 4,145.71 981.52 N 4,526.41 E 3144.84 1.22 10402.71 89.63 126.95 4,146.45 925.32 N 4,600.96 E 3238.14 0.21 10496.06 90.69 129.75 4,146.18 867.41 N 4,674.16 E 3331.32 3.21 10589.40 90.71 129.94 4,145.04 807.61 N 4,745.82 E 3424.32 0.20 10682.78 89.02 128.16 4,145.26 748.78 N 4,818.33 E 3517.46 2.63 10776.23 90.18 127.09 4,145.92 691.74 N 4,892.34 E 3610.81 1.69 10869.59 91.76 127.81 4,144.34 634.98 N 4,966.45 E 3704.07 1.86 10962.99 90.69 127.73 4,142.34 577.78 N 5,040.26 E 3797.33 1.15 11056.47 88.97 125.60 4,142.62 521.97 N 5,115.23 E 3890.77 2.93 11149.72 89.54 126.55 4,143.83 467.07 N 5,190.60 E 3983.99 1.19 11243.06 89.41 127.18 4,144.68 411.07 N 5,265.27 E 4077.28 0.69 11336.47 89.39 126.15 4,145.66 355.30 N 5,340.19 E 4170.64 1.10 11429.90 89.25 124.84 4,146.77 301.05 N 5,416.25 E 4264.06 1.41 11523.35 90.14 125.57 4,147.27 247.18 N 5,492.61 E 4357.50 1.23 11616.74 92.58 125.86 4,145.05 192.68 N 5,568.41 E 4450.85 2.63 11710.10 91.23 124.80 4,141.95 138.73 N 5,644.53 E 4544.16 1.84 11803.51 89.37 123.06 4,141.46 86.59 N 5,722.03 E 4637.54 2.73 11896.90 89.63 123.95 4,142.28 35.04 N 5,799.89 E 4730.90 0.99 11990.19 89.17 123.49 4,143.25 16.74 S 5,877.48 E 4824.16 0.70 12083.44 91.57 124.76 4,142.65 69.05 S 5,954.67 E 4917.39 2.91 12176.77 91.54 125.75 4,140.12 122.90 S 6,030.85 E 5010.68 1.06 12270.13 90.98 124.47 4,138.06 176.58 S 6,107.21 E 5104.01 1.50 12363.52 90.91 124.92 4,136.52 229.73 S 6,183.98 E 5197.39 0.49 12456.95 90.47 125.42 4,135.40 283.55 S 6,260.35 E 5290.81 0.71 12550.33 90.01 126.35 4,135.01 338.28 S 6,336.00 E 5384.18 1.11 12643.66 89.88 124.66 4,135.10 392.48 S 6,411.98 E 5477.50 1.82 12737.05 90.57 125.08 4,134.73 445.87 S 6,488.60 E 5570.89 0.86 12830.44 89.10 124.89 4,135.00 499.42 S 6,565.11 E 5664.28 1.59 12923.81 90.82 126.60 4,135.06 553.96 S 6,640.88 E 5757.63 2.60 13017.23 90.91 126.41 4,133.65 609.53 S 6,715.97 E 5851.01 0.23 13110.50 89.39 124.57 4,133.41 663.67 S 6,791.90 E 5944.27 2.56 13203.83 92.76 125.07 4,131.66 716.95 S 6,868.50 E 6037.57 3.65 13297.11 90.86 124.54 4,128.71 770.16 S 6,945.05 E 6130.80 2.11 13390.53 88.50 124.35 4,129.24 822.99 S 7,022.08 E 6224.20 2.53 13483.92 89.11 124.36 4,131.18 875.68 S 7,099.16 E 6317.57 0.65 13577.29 89.05 125.61 4,132.68 929.21 S 7,175.65 E 6410.92 1.34 13670.62 87.30 124.80 4,135.65 982.99 S 7,251.87 E 6504.20 2.07 13764.03 88.66 126.95 4,138.95 1,037.69 S 7,327.50 E 6597.53 2.72 13857.38 87.77 125.86 4,141.86 1,093.06 S 7,402.60 E 6690.81 1.51 13950.61 89.17 125.95 4,144.34 1,147.72 S 7,478.08 E 6783.99 1.50 14043.91 89.77 126.54 4,145.21 1,202.88 S 7,553.33 E 6877.26 0.90 14137.39 89.79 126.35 4,145.57 1,258.41 S 7,628.52 E 6970.71 0.20 14230.69 89.77 126.96 4,145.92 1,314.11 S 7,703.37 E 7063.97 0.65 INSITE V8.1.10 Page 4Job No:AK-XX-0902267570 Well Name:SP04-SE5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14323.97 89.24 127.59 4,146.73 1,370.60 S 7,777.60 E 7157.18 0.88 14417.41 88.83 127.21 4,148.30 1,427.34 S 7,851.81 E 7250.52 0.60 14510.71 88.80 125.28 4,150.23 1,482.49 S 7,927.04 E 7343.77 2.07 14604.07 89.66 125.63 4,151.49 1,536.64 S 8,003.08 E 7437.12 0.99 14697.47 91.20 126.87 4,150.79 1,591.86 S 8,078.40 E 7530.49 2.12 14790.80 90.77 126.36 4,149.18 1,647.52 S 8,153.30 E 7623.77 0.71 14884.09 91.25 125.90 4,147.54 1,702.52 S 8,228.64 E 7717.03 0.71 14977.40 91.37 125.15 4,145.41 1,756.72 S 8,304.56 E 7810.31 0.81 15070.79 90.73 123.32 4,143.69 1,809.25 S 8,381.75 E 7903.67 2.08 15164.20 91.71 123.55 4,141.71 1,860.71 S 8,459.68 E 7997.02 1.08 15257.58 92.09 123.74 4,138.61 1,912.41 S 8,537.38 E 8090.33 0.45 15350.75 90.30 123.30 4,136.67 1,963.85 S 8,615.03 E 8183.44 1.98 15444.10 91.92 124.29 4,134.86 2,015.76 S 8,692.59 E 8276.75 2.03 15537.46 90.05 123.55 4,133.25 2,067.85 S 8,770.05 E 8370.07 2.15 15630.92 89.22 124.45 4,133.85 2,120.11 S 8,847.53 E 8463.51 1.31 15724.28 91.33 125.38 4,133.40 2,173.54 S 8,924.07 E 8556.87 2.47 15817.49 90.71 125.48 4,131.74 2,227.57 S 9,000.01 E 8650.06 0.67 15910.92 90.86 125.26 4,130.46 2,281.64 S 9,076.19 E 8743.48 0.28 16004.35 91.58 126.46 4,128.47 2,336.36 S 9,151.89 E 8836.88 1.50 16097.73 91.29 126.28 4,126.13 2,391.72 S 9,227.06 E 8930.20 0.37 16191.15 91.29 127.19 4,124.03 2,447.58 S 9,301.91 E 9023.55 0.97 16284.46 91.48 127.06 4,121.78 2,503.88 S 9,376.28 E 9116.77 0.25 16377.88 91.10 127.38 4,119.67 2,560.37 S 9,450.66 E 9210.10 0.53 16471.25 90.74 124.94 4,118.17 2,615.45 S 9,526.02 E 9303.43 2.64 16564.57 89.80 125.31 4,117.73 2,669.15 S 9,602.35 E 9396.74 1.08 16657.89 89.54 124.99 4,118.27 2,722.87 S 9,678.65 E 9490.06 0.44 16751.28 87.70 124.30 4,120.52 2,775.94 S 9,755.46 E 9583.42 2.10 16844.53 89.08 125.11 4,123.14 2,829.01 S 9,832.08 E 9676.63 1.72 16937.85 87.41 124.68 4,126.00 2,882.37 S 9,908.59 E 9769.90 1.85 17031.11 89.36 124.93 4,128.63 2,935.58 S 9,985.13 E 9863.12 2.11 17124.54 89.73 126.19 4,129.37 2,989.91 S 10,061.13 E 9956.54 1.41 17217.59 89.80 126.77 4,129.75 3,045.23 S 10,135.95 E 10049.56 0.63 17310.93 88.00 124.83 4,131.54 3,099.82 S 10,211.63 E 10142.86 2.83 17350.69 89.37 126.41 4,132.45 3,122.97 S 10,243.94 E 10182.61 5.26 17418.00 91.00 126.50 4,132.24 3,162.96 S 10,298.08 E 10249.89 2.43 INSITE V8.1.10 Page 5Job No:AK-XX-0902267570 Well Name:SP04-SE5 Survey Report DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 125.00 degrees (True) - A total correction of 18.85 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 17,418.00 feet is 10,772.87 feet along 107.07 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.1.10 Page 6Job No:AK-XX-0902267570 Well Name:SP04-SE5 Survey Report WELL INFORMATION Created On : Jun 09 2015 Customer :ENI Petroleum Well Name :SP04-SE5 L1 Job Number :AK-XX-0902267570 Rig Name :Doyon 15 Field Name :Nikaitchuq Country :USA Survey Report SURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 350.00 0.00 0.00 N 0.00 E 0.00 0.00 40.80 0.00 350.00 40.80 0.00 N 0.00 E 0.00 0.00 121.53 0.79 327.77 121.53 0.47 N 0.30 W -0.51 0.98 161.04 0.81 330.30 161.03 0.94 N 0.58 W -1.02 0.10 254.04 0.23 345.81 254.03 1.70 N 0.95 W -1.75 0.64 346.64 1.19 1.70 346.62 2.84 N 0.97 W -2.42 1.05 404.84 1.09 356.44 404.81 3.99 N 0.99 W -3.10 0.25 453.02 2.10 352.54 452.97 5.33 N 1.13 W -3.98 2.11 545.54 3.81 351.44 545.36 10.05 N 1.81 W -7.24 1.85 638.50 6.61 351.42 637.93 18.39 N 3.06 W -13.06 3.01 731.55 11.36 353.85 729.81 32.81 N 4.85 W -22.79 5.12 789.95 15.01 354.54 786.66 46.06 N 6.18 W -31.48 6.26 883.33 19.34 351.44 875.86 73.40 N 9.64 W -49.99 4.74 976.78 22.34 350.84 963.19 106.24 N 14.77 W -73.04 3.22 1070.14 26.24 350.05 1,048.27 144.10 N 21.16 W -99.99 4.19 1163.54 29.46 351.17 1,130.84 187.15 N 28.26 W -130.49 3.49 1257.02 29.86 351.16 1,212.07 232.86 N 35.36 W -162.53 0.43 1350.27 35.11 350.78 1,290.70 282.30 N 43.23 W -197.33 5.63 1443.61 40.48 352.58 1,364.43 338.88 N 51.45 W -236.52 5.87 1537.02 39.46 353.28 1,436.02 398.43 N 58.84 W -276.73 1.19 1630.45 40.00 351.86 1,507.88 457.64 N 66.57 W -317.02 1.13 1723.90 39.88 351.26 1,579.53 516.98 N 75.37 W -358.27 0.43 1817.29 41.20 350.38 1,650.50 576.91 N 85.06 W -400.58 1.54 1910.65 40.12 351.15 1,721.32 636.94 N 94.83 W -443.01 1.28 2004.06 42.24 348.47 1,791.63 697.46 N 105.74 W -486.66 2.95 2097.45 43.56 348.26 1,860.04 759.72 N 118.56 W -532.88 1.42 2190.74 44.51 348.39 1,927.10 823.23 N 131.68 W -580.05 1.02 2283.99 45.35 348.77 1,993.12 887.78 N 144.72 W -627.75 0.95 2377.32 50.78 347.13 2,055.47 955.64 N 159.25 W -678.58 5.96 2470.68 51.94 348.18 2,113.77 1,026.87 N 174.83 W -732.20 1.52 INSITE V8.1.10 Page 1Job No:AK-XX-0902267570 Well Name:SP04-SE5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2564.07 56.20 348.82 2,168.56 1,100.96 N 189.89 W -787.04 4.60 2657.50 59.44 347.46 2,218.31 1,178.33 N 206.16 W -844.74 3.68 2750.88 62.84 347.15 2,263.38 1,258.10 N 224.13 W -905.22 3.65 2844.21 61.49 347.37 2,306.95 1,338.60 N 242.33 W -966.30 1.46 2937.60 64.77 346.65 2,349.16 1,419.76 N 261.06 W -1028.19 3.58 3030.99 63.51 346.37 2,389.89 1,501.48 N 280.67 W -1091.12 1.38 3124.36 68.23 346.06 2,428.05 1,584.21 N 300.97 W -1155.21 5.06 3212.83 67.07 346.81 2,461.69 1,663.75 N 320.16 W -1216.55 1.53 3311.19 64.94 349.12 2,501.69 1,751.62 N 338.91 W -1282.31 3.05 3386.16 61.00 352.09 2,535.76 1,817.48 N 349.84 W -1329.03 6.33 3479.53 58.62 355.81 2,582.72 1,897.70 N 358.37 W -1382.04 4.28 3572.86 58.25 357.21 2,631.58 1,977.07 N 363.22 W -1431.53 1.34 3666.27 58.61 359.61 2,680.49 2,056.62 N 365.42 W -1478.96 2.22 3759.62 58.94 0.05 2,728.88 2,136.45 N 365.66 W -1524.94 0.54 3852.85 58.71 2.20 2,777.15 2,216.19 N 364.09 W -1569.40 1.99 3946.15 58.06 3.69 2,826.06 2,295.53 N 360.01 W -1611.57 1.53 4039.63 55.37 6.53 2,877.36 2,373.35 N 353.09 W -1650.53 3.84 4132.93 52.73 11.32 2,932.15 2,447.93 N 341.43 W -1683.76 5.03 4226.21 51.37 16.38 2,989.54 2,519.31 N 323.86 W -1710.31 4.52 4319.65 51.64 22.74 3,047.74 2,588.16 N 299.39 W -1729.75 5.33 4412.95 52.85 29.94 3,104.91 2,654.17 N 266.66 W -1740.81 6.24 4506.31 54.07 35.03 3,160.52 2,717.39 N 226.38 W -1744.07 4.57 4599.71 55.56 41.87 3,214.38 2,777.09 N 178.93 W -1739.44 6.19 4693.04 56.48 46.63 3,266.56 2,832.49 N 124.94 W -1726.99 4.34 4786.33 56.10 52.39 3,318.37 2,882.85 N 65.96 W -1707.57 5.15 4879.64 56.72 58.63 3,370.02 2,926.82 N 1.94 W -1680.34 5.61 4973.03 57.28 60.37 3,420.89 2,966.56 N 65.54 E -1647.86 1.67 5066.44 56.32 62.55 3,472.04 3,003.91 N 134.20 E -1613.04 2.21 5159.82 57.01 64.87 3,523.36 3,038.45 N 204.14 E -1575.57 2.20 5252.99 58.34 69.18 3,573.20 3,069.15 N 276.60 E -1533.81 4.16 5346.34 59.24 69.94 3,621.57 3,097.03 N 351.41 E -1488.52 1.19 5439.70 59.98 71.82 3,668.80 3,123.40 N 427.50 E -1441.32 1.91 5533.16 61.46 75.73 3,714.52 3,146.15 N 505.75 E -1390.27 3.98 5626.52 63.72 79.22 3,757.51 3,164.10 N 586.64 E -1334.30 4.11 5719.73 66.60 82.64 3,796.67 3,177.40 N 670.15 E -1273.52 4.54 5813.16 67.96 85.19 3,832.76 3,186.52 N 755.84 E -1208.57 2.91 5906.59 69.56 88.71 3,866.62 3,191.14 N 842.78 E -1140.00 3.91 5999.97 71.10 91.59 3,898.05 3,190.90 N 930.69 E -1067.84 3.34 6093.39 73.25 94.42 3,926.65 3,186.23 N 1,019.49 E -992.43 3.69 6186.70 74.37 95.81 3,952.67 3,178.23 N 1,108.74 E -914.73 1.87 6222.49 74.15 96.37 3,962.38 3,174.58 N 1,142.99 E -884.58 1.63 6253.45 75.06 97.83 3,970.60 3,170.89 N 1,172.61 E -858.20 5.41 6280.66 75.50 98.73 3,977.51 3,167.10 N 1,198.65 E -834.69 3.58 6313.28 76.35 100.15 3,985.45 3,161.91 N 1,229.86 E -806.15 4.96 6345.00 77.23 101.16 3,992.70 3,156.20 N 1,260.21 E -778.02 4.16 INSITE V8.1.10 Page 2Job No:AK-XX-0902267570 Well Name:SP04-SE5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6373.49 77.79 101.75 3,998.86 3,150.68 N 1,287.47 E -752.52 2.82 6407.45 78.54 102.73 4,005.82 3,143.63 N 1,319.95 E -721.87 3.59 6438.23 78.99 103.24 4,011.82 3,136.84 N 1,349.37 E -693.88 2.19 6466.81 79.50 103.84 4,017.15 3,130.27 N 1,376.67 E -667.75 2.73 6532.06 81.70 105.62 4,027.81 3,113.90 N 1,438.92 E -607.36 4.31 6560.13 82.72 106.43 4,031.61 3,106.22 N 1,465.65 E -581.07 4.62 6653.52 85.60 109.18 4,041.12 3,077.82 N 1,554.09 E -492.33 4.25 6746.77 87.47 110.53 4,046.75 3,046.20 N 1,641.63 E -402.49 2.47 6840.09 86.88 112.36 4,051.35 3,012.13 N 1,728.38 E -311.88 2.06 6933.35 87.08 115.22 4,056.27 2,974.56 N 1,813.58 E -220.54 3.07 7026.78 88.24 118.11 4,060.08 2,932.68 N 1,897.00 E -128.18 3.33 7119.83 87.14 119.94 4,063.83 2,887.57 N 1,978.29 E -35.72 2.29 7213.17 86.61 122.01 4,068.92 2,839.60 N 2,058.20 E 57.25 2.29 7306.51 86.24 124.92 4,074.74 2,788.24 N 2,135.90 E 150.36 3.14 7399.91 86.15 127.40 4,080.94 2,733.26 N 2,211.14 E 243.53 2.65 7407.00 86.10 127.63 4,081.42 2,728.95 N 2,216.75 E 250.60 3.31 7424.00 87.93 128.71 4,082.31 2,718.46 N 2,230.10 E 267.55 12.50 7509.32 87.33 131.77 4,085.84 2,663.40 N 2,295.16 E 352.43 3.65 7602.71 86.33 135.11 4,091.00 2,599.29 N 2,362.86 E 444.65 3.73 7696.06 87.61 138.47 4,095.94 2,531.36 N 2,426.67 E 535.89 3.85 7730.33 86.70 139.64 4,097.64 2,505.50 N 2,449.10 E 569.09 4.32 7789.49 86.12 142.80 4,101.35 2,459.48 N 2,486.08 E 625.78 5.42 7882.82 87.51 140.76 4,106.53 2,386.28 N 2,543.73 E 714.99 2.64 7976.11 88.74 138.18 4,109.58 2,315.42 N 2,604.31 E 805.26 3.06 8069.89 88.40 133.49 4,111.93 2,248.19 N 2,669.61 E 897.31 5.01 8162.75 88.91 130.43 4,114.11 2,186.12 N 2,738.64 E 989.45 3.34 8256.21 88.98 128.98 4,115.83 2,126.43 N 2,810.53 E 1082.58 1.55 8349.53 89.54 132.03 4,117.03 2,065.83 N 2,881.47 E 1175.45 3.32 8442.88 89.80 131.47 4,117.57 2,003.67 N 2,951.11 E 1268.15 0.66 8536.29 88.56 130.69 4,118.91 1,942.30 N 3,021.51 E 1361.02 1.57 8629.74 88.82 130.25 4,121.04 1,881.66 N 3,092.59 E 1454.02 0.55 8722.41 87.34 128.61 4,124.15 1,822.84 N 3,164.12 E 1546.36 2.38 8816.56 87.11 128.89 4,128.71 1,763.98 N 3,237.46 E 1640.20 0.38 8909.92 88.03 126.18 4,132.67 1,707.16 N 3,311.42 E 1733.37 3.06 9003.32 88.12 125.48 4,135.80 1,652.51 N 3,387.10 E 1826.71 0.76 9096.62 88.60 126.74 4,138.47 1,597.55 N 3,462.44 E 1919.95 1.44 9190.10 87.83 127.38 4,141.38 1,541.24 N 3,537.00 E 2013.32 1.07 9283.52 87.63 125.86 4,145.09 1,485.56 N 3,611.92 E 2106.63 1.64 9376.90 90.09 124.57 4,146.94 1,431.73 N 3,688.19 E 2199.98 2.97 9470.34 90.80 123.14 4,146.22 1,379.68 N 3,765.78 E 2293.40 1.71 9563.74 91.61 123.66 4,144.25 1,328.28 N 3,843.74 E 2386.74 1.03 9657.11 90.66 123.02 4,142.40 1,276.97 N 3,921.73 E 2480.05 1.23 9750.55 90.49 124.98 4,141.47 1,224.73 N 3,999.18 E 2573.47 2.11 9844.05 90.88 122.30 4,140.35 1,172.94 N 4,077.01 E 2666.93 2.90 9937.48 90.48 125.00 4,139.24 1,121.18 N 4,154.77 E 2760.31 2.92 INSITE V8.1.10 Page 3Job No:AK-XX-0902267570 Well Name:SP04-SE5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10030.86 91.28 127.50 4,137.80 1,065.97 N 4,230.07 E 2853.65 2.81 10124.22 90.81 129.55 4,136.10 1,007.83 N 4,303.09 E 2946.82 2.25 10217.66 90.38 129.29 4,135.13 948.50 N 4,375.27 E 3039.97 0.54 10311.02 90.45 130.38 4,134.46 888.70 N 4,446.95 E 3133.00 1.17 10404.37 90.06 131.49 4,134.04 827.54 N 4,517.47 E 3225.84 1.26 10497.71 90.41 129.24 4,133.66 767.09 N 4,588.59 E 3318.77 2.44 10591.09 90.85 128.44 4,132.63 708.53 N 4,661.32 E 3411.93 0.98 10684.54 90.62 128.16 4,131.43 650.62 N 4,734.65 E 3505.22 0.39 10777.90 89.64 125.77 4,131.22 594.48 N 4,809.24 E 3598.51 2.77 10871.30 90.55 126.20 4,131.06 539.61 N 4,884.81 E 3691.90 1.08 10964.78 87.12 125.75 4,132.97 484.71 N 4,960.44 E 3785.33 3.70 11058.03 89.03 126.41 4,136.10 429.83 N 5,035.75 E 3878.51 2.17 11151.37 89.60 125.92 4,137.21 374.75 N 5,111.10 E 3971.82 0.81 11244.78 88.97 124.93 4,138.38 320.61 N 5,187.21 E 4065.22 1.26 11338.21 89.21 125.11 4,139.86 267.00 N 5,263.72 E 4158.64 0.32 11431.66 90.20 124.32 4,140.34 213.79 N 5,340.53 E 4252.08 1.36 11525.05 90.92 124.16 4,139.43 161.24 N 5,417.73 E 4345.46 0.79 11618.41 89.57 123.56 4,139.03 109.23 N 5,495.25 E 4438.80 1.58 11711.82 89.11 124.24 4,140.11 57.13 N 5,572.78 E 4532.19 0.88 11805.21 87.88 125.68 4,142.56 3.64 N 5,649.29 E 4625.54 2.03 11898.50 87.71 126.20 4,146.15 51.07 S 5,724.76 E 4718.75 0.59 11991.75 88.83 125.87 4,148.97 105.90 S 5,800.13 E 4811.94 1.25 12085.08 88.64 124.33 4,151.03 159.55 S 5,876.47 E 4905.24 1.66 12178.44 88.67 124.86 4,153.22 212.55 S 5,953.30 E 4998.57 0.57 12271.83 90.97 126.02 4,153.51 266.69 S 6,029.38 E 5091.95 2.76 12365.26 90.09 126.86 4,152.65 322.19 S 6,104.54 E 5185.35 1.30 12458.64 89.81 128.53 4,152.73 379.28 S 6,178.43 E 5278.62 1.81 12551.97 89.81 127.91 4,153.04 437.02 S 6,251.75 E 5371.80 0.66 12645.36 90.25 127.20 4,152.99 493.95 S 6,325.79 E 5465.10 0.89 12738.75 90.11 126.88 4,152.70 550.20 S 6,400.33 E 5558.43 0.37 12832.12 91.10 126.01 4,151.71 605.66 S 6,475.43 E 5651.76 1.41 12925.54 89.94 125.20 4,150.86 660.05 S 6,551.39 E 5745.17 1.51 13018.81 90.03 126.17 4,150.89 714.46 S 6,627.14 E 5838.43 1.04 13112.14 90.88 124.66 4,150.15 768.54 S 6,703.20 E 5931.75 1.86 13205.42 91.65 123.85 4,148.09 821.03 S 6,780.28 E 6025.00 1.20 13298.84 91.94 122.83 4,145.16 872.35 S 6,858.28 E 6118.33 1.13 13392.23 91.30 124.01 4,142.52 923.76 S 6,936.20 E 6211.65 1.44 13485.60 90.63 123.17 4,140.95 975.41 S 7,013.97 E 6304.98 1.15 13578.93 90.94 125.23 4,139.67 1,027.86 S 7,091.15 E 6398.28 2.23 13672.34 90.82 124.32 4,138.23 1,081.13 S 7,167.86 E 6491.68 0.98 13765.69 90.37 123.70 4,137.26 1,133.34 S 7,245.24 E 6585.01 0.82 13858.92 91.02 122.36 4,136.13 1,184.15 S 7,323.39 E 6678.18 1.60 13952.22 90.41 124.08 4,134.97 1,235.26 S 7,401.44 E 6771.42 1.96 14045.70 90.35 123.68 4,134.35 1,287.37 S 7,479.04 E 6864.88 0.43 14139.00 90.62 125.88 4,133.56 1,340.59 S 7,555.67 E 6958.17 2.38 INSITE V8.1.10 Page 4Job No:AK-XX-0902267570 Well Name:SP04-SE5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14232.28 89.75 126.67 4,133.26 1,395.78 S 7,630.87 E 7051.43 1.26 14325.72 89.35 127.27 4,133.99 1,451.97 S 7,705.52 E 7144.81 0.77 14419.02 89.61 128.65 4,134.84 1,509.36 S 7,779.07 E 7237.98 1.51 14512.38 90.17 129.21 4,135.02 1,568.02 S 7,851.70 E 7331.12 0.85 14605.78 90.68 128.97 4,134.33 1,626.91 S 7,924.19 E 7424.27 0.60 14699.11 91.00 128.02 4,132.96 1,685.00 S 7,997.23 E 7517.42 1.07 14792.40 90.15 127.38 4,132.02 1,742.04 S 8,071.04 E 7610.60 1.14 14885.71 89.84 126.74 4,132.03 1,798.27 S 8,145.50 E 7703.85 0.76 14979.10 89.74 126.72 4,132.37 1,854.13 S 8,220.35 E 7797.20 0.11 15072.51 91.19 125.99 4,131.61 1,909.49 S 8,295.57 E 7890.57 1.74 15165.89 89.37 125.65 4,131.16 1,964.14 S 8,371.28 E 7983.94 1.98 15259.06 88.44 125.81 4,132.94 2,018.54 S 8,446.90 E 8077.08 1.01 15352.41 87.87 125.00 4,135.94 2,072.59 S 8,522.95 E 8170.38 1.06 15445.77 87.69 124.22 4,139.56 2,125.58 S 8,599.73 E 8263.67 0.86 15539.23 88.59 123.72 4,142.59 2,177.77 S 8,677.20 E 8357.06 1.10 15632.59 89.71 122.81 4,143.98 2,228.97 S 8,755.25 E 8450.37 1.55 15725.80 89.26 122.31 4,144.82 2,279.14 S 8,833.80 E 8543.49 0.72 15819.74 89.36 123.93 4,145.95 2,330.46 S 8,912.47 E 8637.37 1.73 15912.66 89.64 125.62 4,146.76 2,383.45 S 8,988.79 E 8730.28 1.84 16006.04 92.37 125.63 4,145.12 2,437.83 S 9,064.68 E 8823.63 2.92 16099.46 91.78 125.42 4,141.74 2,492.08 S 9,140.66 E 8916.99 0.67 16192.77 91.52 125.24 4,139.05 2,546.01 S 9,216.75 E 9010.26 0.34 16286.19 91.82 124.60 4,136.33 2,599.47 S 9,293.32 E 9103.64 0.76 16379.56 91.87 125.30 4,133.32 2,652.93 S 9,369.81 E 9196.96 0.75 16472.88 92.27 124.71 4,129.95 2,706.43 S 9,446.20 E 9290.21 0.76 16566.20 90.06 124.17 4,128.05 2,759.19 S 9,523.14 E 9383.50 2.44 16659.59 90.52 123.63 4,127.58 2,811.27 S 9,600.65 E 9476.88 0.76 16752.84 91.82 124.92 4,125.68 2,863.78 S 9,677.69 E 9570.10 1.96 16846.16 91.83 124.14 4,122.71 2,916.65 S 9,754.53 E 9663.36 0.84 16939.42 92.60 123.87 4,119.10 2,968.76 S 9,831.78 E 9756.54 0.87 17032.85 91.89 124.20 4,115.44 3,021.02 S 9,909.15 E 9849.88 0.84 17125.90 92.21 124.62 4,112.11 3,073.57 S 9,985.87 E 9942.87 0.57 17218.60 90.74 125.23 4,109.73 3,126.62 S 10,061.84 E 10035.54 1.72 17312.58 90.39 124.23 4,108.80 3,180.16 S 10,139.08 E 10129.51 1.13 17352.68 91.68 124.82 4,108.08 3,202.88 S 10,172.11 E 10169.60 3.54 17420.00 91.68 124.82 4,106.10 3,241.30 S 10,227.35 E 10236.89 0.00 INSITE V8.1.10 Page 5Job No:AK-XX-0902267570 Well Name:SP04-SE5 L1 Survey Report DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 125.00 degrees (True) - A total correction of 18.85 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 17,420.00 feet is 10,728.69 feet along 107.58 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.1.10 Page 6Job No:AK-XX-0902267570 Well Name:SP04-SE5 L1 Survey Report