Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout216-040
Technical Report Title
Date
Client: Caelus Energy Alaska
Field: Oooguruk Development
Rig: Nabors 19AC
Date: April 15, 2016
Surface Data Logging
End of Well Report
ODSN-20i
ODSN-20i PB1
ODSN-20i PB2
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Formation Tops
6. Mud Record
7. Bit Record
8. Morning Reports
9. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: Caelus Energy Alaska, LLC
Rig: Nabors 19AC
Well: ODSN-20i, ODSN-20i PB1, & ODSN-20i PB2
Field: Oooguruk
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-703-20740-00-00 (ODSN-20i)
50-703-20740-70-00 (ODSN-20i PB1)
50-703-20740-71-00 (ODSN-20i PB2)
Sperry Job Number: AK-AM-0903191168
Job Start Date: 12 March 2016
Spud Date: 14 March 2016
Total Depth: 6460’ MD, 3204’ TVD (ODSN-20i)
2769’ MD, 2082’ TVD (ODSN-20i PB1)
5942’ MD, 3026’ TVD (ODSN-20i PB2)
North Reference: True
Declination: 18.532°
Dip Angle: 81.046°
Total Field Strength: 57542 nT
Date Of Magnetic Data: 19 March 2016
Wellhead Coordinates N: North 70° 29’ 40.078”
Wellhead Coordinates W: West 150° 14’ 48.891“
Drill Floor Elevation 56.20’
Ground Elevation: 13.50’
Permanent Datum: Mean Sea Level
SDL Engineers: Kerry Garner, Beverly Hur, Martin Nnaji, David
Durst
Company Geologist: Fetcher England, Mindaugas Kusminskas, Paul
Cozma, John Hill
Company Representatives: Joe Polya, Rodney Klepzig, Joe Petitjean, CA
Demoski
SSDS Unit Number: 123
DAILY SUMMARY
03/12/2016
SDL continues on location from previous well. Installed and upgraded a new computer in the
unit. Gas gear was calibrated. The rig moved to ODSN-20i and began to spot and level.
03/13/2016
All gas equipment was rigged up and a second calibration of all equipment was completed. Pits
were filled with spud mud. The rig was leveled, rigged up and connected to the diverter system.
03/14/2016
SDL prepared the logs for drilling the surface section. All gas lines and equipment were checked
in preparation as well. Rig commenced drilling surface at 18:50.
Gas: There was no drill gas and no connection gas.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/15/2016
Picked up the Bottom Hole Assembly, tripped in the hole and began drilling ahead. Back-
reamed at 717' MD to correct a high dog leg, drilled ahead to 879' MD, took survey shots and
serviced the rig. We experienced a flow line pack off at 792’ MD and returned to back-reaming.
Once the flow line was cleared, checked all gas lines, CVE, and degasser. All lines and
equipment were free and clear of mud and debris. We drilled from 281' MD to 907' MD.
Gas: Max gas was 60 units at 803’ with average of 53 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/16/2016
Drilled ahead from 907' MD to the base of the Permafrost at 1826' MD, average gas values
at the base of the Permafrost were 20 units and comprised entirely of methane. Continued
drilling ahead to the Ugnu formation at 1925' MD and observed gas values of 11-13 units.
Gas: Max gas was 71 units at 1150’ MD with an average of 53 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/17/2016
Drilled ahead in the Ugnu from 2210’ MD to 2769’ MD, then back reamed out of the hole to
change out the Bottom Hole Assembly. Gas gear was calibrated while the rig laid down the
Bottom Hole Assembly.
Gas: Max gas was 47 units at 2576’ MD with an average of 19 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/18/2016
Tripped in the hole from 631’ MD to 2339’ MD, working through tight spots as directed.
Determined the well had been sidetracked at 2427’ MD in the Ugnu D. Took survey shots and
pulled two stands to 2308’ MD. Tripped in the hole to 2525’ MD without issues and continued to
drill ahead.
Gas: Max gas was 78 units at 2526’ MD with an average of 15 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/19/2016
Back-reamed out of the hole from 2866’ MD to 624’ MD with a tight spot observed at 1566’ MD
in the Permafrost. Tripped in the hole to 2958’ MD and took survey shots.
Gas: Max trip gas was 39 units with an average of 5 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/20/2016
Began drilling ahead from 2959’ MD in the Ugnu D formation and reached the top of the West
Sak at 3419’ MD / 2307.9 TVD; drilled ahead to 4461’ MD in the surface section.
Gas: Max gas was 33 units at 3416’ MD with an average of 17 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/21/2016
Continued drilling in the West Sak Formation from 4461’ MD to the top of the Cretaceous Tuff at
5381’ MD / 2855.3 TVD reached 5606’ MD.
Gas: Max gas was 19 units at 5514’ MD with an average of 9 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/22/2016
We experienced a drop in pressure at 5942’ MD while drilling in the Cretaceous Tuff. At 5669’
MD the decision was made to trip out of the hole to check the motor. The bit was lost in the
hole. Laid down the bottom hole assembly and prepared to make up a new bottom hole
assembly.
Gas: Max gas was 36 units at 5829’ MD with an average of 16 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/23/2016
Laid down the bottom hole assembly and tripped in the hole to 2124’ MD. Tried to orient
through stacking out but were unable to. Tripped out of the hole and laid down the
bottom hole assembly. Performed rig maintenance and cut and slip the drill line. Picked
up the bottom hole assembly and tripped in the hole to 2024’ MD and began troughing
for the sidetrack.
Gas: Max trip gas was 16 units with an average of 3 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/24/2016
Kickoff point for the sidetrack began at 2024’ MD in the Ugnu D formation. Drilled ahead to
2947’ MD; backreamed out of the hole to change the motor bend.
Gas: Max gas was 64 units at 2157’ MD with an average of 17 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/25/2016
Picked up the bottom hole assembly and set the bend in the motor. Tripped in the hole and
began drilling ahead from 2947’ MD to 3972’ MD.
Gas: Max gas was 27 units at 3071’ MD with an average of 14 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/26/2016
Drilled the surface section from 3972’ MD to 4620’ MD and took survey shots. Drilled ahead to
5089’ MD; backreamed to 4969’ MD. Racked back one stand, oriented the tool to the low side,
and began troughing.
Gas: Max gas was 25 units at 4168’ MD with an average of 11 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/27/2016
Reamed from 5047’ MD to 5068’ MD and drilled ahead to 5192’ MD, the unofficial top of the
Cretaceous Tuff. Drilled ahead to 5555.97’ MD; encountered slow drilling rates until 5709’ MD,
midnight depth.
Gas: Max gas was 25 units at 5610’ MD with an average of 12 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/28/2016
Drilled ahead from 5709’ MD to 6460’ MD; completed the Surface Section at 6460’ MD / 3204’
TVD and backreamed out of the hole to 4800’ MD.
Gas: Max gas was 191 units with an average of 27 units.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/29/2016
Finished backreaming out of the hole to surface and laid down the bottom hole assembly.
Began running in the hole with 11 ¾” casing from surface to 2020’ MD.
Gas: Max gas was 138 units while backreaming.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/30/2016
Ran in the hole with 11 ¾” casing to 2025’ MD; stacked out at 2065’ MD. Tripped out of the hole
and laid down casing to surface.
Gas: Max gas was 66 units while tripping.
Fluids: There were 0 barrels of Spud Mud lost down hole.
03/31/2016
Rigged down and sent out the Tesco tools. Picked up the cleanout Bottom Hole Assembly #8,
uploading MWD tools at 65’ MD. Tripped in the hole to 1610’ MD, then began washing and
reaming down to 2199’ MD at 3 barrels per minute and 500 pound per square inch standpipe
pressure. Reamed and back reamed several times between 1850’ MD and 2296’ MD at flow
rates between 0 and 650 gallons per minute. Oriented the motor low side and ran in the hole
from 1850’ MD to 2185’ MD without issues and pulled up to 1950’ MD. Oriented to 90 left and
ran in the hole to 2195’ MD without issues. Pulled back to 1950’ MD and repeated at 90 right
orientation without problems. Tripped out of the hole from 2195’ MD to 620’ MD and laid down
Bottom Hole Assembly #8 to the surface. Rigged up Tesco casing running tools and began to
run 11 ¾” surface casing from surface to 692’ MD, cleaning galled threads on joint #4.
Gas: Max gas was 14 units while tripping with an average gas of 3 units.
Fluids: There were 0 barrels of Spud mud lost down hole.
04/01/2016
Ran 11 ¾” casing from 692’ MD to 732’ MD. Had issues with galling threads on several joints of
used casing. Removed all used casing from the pipe shed and loaded new joints. Continued to
run casing from 732’ MD to 2113’ MD at 20 feet per minute. Ran casing from 2113’ MD to 2135’
MD, working through a tight spot at 30 revolutions per minute. Pulled 2 joints of casing to 2003’
MD and ran back in the hole to 2135’ MD at 30 revolutions per minute, 22k foot-pounds torque.
Pumped a dry job and pulled casing from 2135’ MD to 932’ MD.
Gas: No significant gas was detected.
Fluids: There were 0 barrels of Spud mud lost down hole.
04/02/2016
Pulled casing from 932’ MD to 267’ MD, then cut the connections on the shoe track to surface.
Rigged down Tesco casing equipment and prepared to pick up Bottom Hole Assembly #9.
Picked up Bottom Hole Assembly #9 from surface to 567’ MD, uploading MWD tools at 63’ MD.
Tripped in the hole to 2243’ MD, pumping at 450 gallons per minute through the sidetrack point
at 1958’ MD. Backreamed 4 times between 1958’ MD and 2243’ MD at 650 gallons per minute,
1330 pounds per square inch standpipe pressure, 80-100 revolutions per minute, 5-12k foot-
pounds torque. Continued to trip in the hole to 5409’ MD, working tight spots from 2325’ MD to
2522’ MD at 300 gallons per minute, 580 pounds per square inch standpipe pressure, 30
revolutions per minute, 7-11k foot-pounds torque.
Gas: No significant gas was detected.
Fluids: There were 0 barrels of Spud mud lost down hole.
04/03/2016
Reamed and washed through tight hole from 5409’ MD to 6460’ MD at 300 gallons per minute,
580 pounds per square inch standpipe pressure, 30 revolutions per minute, and 8-11k foot-
pounds torque. Back reamed from 6460’ MD to 5660’ MD at 650 gallons per minute, 1580
pounds per square inch standpipe pressure, 100 revolutions per minute, 8-11k foot-pounds
torque. Had tight hole issues back reaming between 5660’ MD and 5409’ MD with torque
between 11 and 34 foot-pounds. Continued backreaming from 5409’ MD to 5130’ MD and
circulated a bottoms up at 650 gallons per minute, 1600 pounds per square inch standpipe
pressure, 100 revolutions per minute, 11-30k foot-pounds torque. Backreamed to 4291’ MD,
continuing to fight tight hole issues, reducing to 450 gallons per minute, 850 pounds per square
inch standpipe pressure, 30-80 revolutions per minute, 8-34k foot-pounds torque. Tripped out of
the hole on elevators from 4291’ MD to 2580’ MD, pumping a dry job at 3919’ MD. Tripped out
of the hole, working a tight spot from 2580’ MD to 2522’ MD at 300 gallons per minute, 480
pounds per square inch standpipe pressure, 30 revolutions per minute, 8-10k foot-pounds
torque. Worked the sidetrack point between 2150’ MD and 1963’ MD at 450 gallons per minute,
830 pounds per square inch standpipe pressure, then tripped out of the hole on elevators from
2150’ MD to 567’ MD. Laid down Bottom Hole Assembly #9 to surface, observing that both
stabilizers and the bit were packed off. Rigged up Tesco casing running tools and ran casing
from surface to 730’ MD.
Gas: The max circulation gas was 69 units at the bottoms up from establishing circulation on
bottom; the average trip and circulation gas was 10 units.
Fluids: There were 22 barrels of Spud mud lost down hole, all while back reaming out of the
hole.
04/04/2016
Ran casing from 730’ MD to 2000’ MD. Continued running casing at 5 fpm from 2000’ MD to
2050’ MD, then ran in the hole, tagging up at 2135’ MD. Pulled up to 1999’ MD, then ran in
again to 2135’ MD at 30 rpm, 13k foot-pounds torque. Ran in to 2194’ MD, then waited on
orders while working pipe and pumping 10 barrels every 30 minutes. Pumped a dry job and
pulled casing from 2094’ MD to surface and heated up the shoe track to break it out.
Gas: The max circulation gas was 27 units; the average trip and circulation gas was 2 units.
Fluids: There were 0 barrels of Spud mud lost down hole.
04/05/2016
Rig down Tesco casing running equipment, then rigged up GBR to run 2 7/8” tubing. Ran 2 7/8”
tubing from surface to 969’ MD. Laid down Sperry tools and 5.5” drill pipe in the mouse hole.
Made the cement head and spotted a 50 barrel, 10.7 pound per gallon pill at 961’ MD. Laid
down tubing from 961’ MD to 861’ MD, then performed the first stage of the plug and abandon
cement job. Laid down tubing from 861’ MD to 561’ MD, then circulated 1 bottoms up.
Performed the second stage plug and abandon cement job, and laid down tubing to 261’ MD.
Circulated another bottoms up, and performed the third stage cement job. Laid down tubing
from 261’ MD to 100’ MD and cleaned out the cement stinger with 9.4 pound per gallon LSND,
pumping 56 barrels at 168 gallons per minute. Pumped 59 barrels of seawater at 336 gallons
per minute and blew down the cement lines.
Gas: No significant gas was detected
Fluids: There were 0 barrels of Spud mud lost down hole.
04/06/2016
Laid down the last 4 joints of 2 7/8” tubing. Picked up the Johnny Wacker and flushed the riser
and diverter stack. Rigged down GBR, then rigg ed down the diverter system. Laid down 5.5”
drill pipe to empty the derrick. Disconnect the flow line, mud feed and return, and seawater
lines. The rig was released from ODSN-20i at 00:00.
0
1000
2000
3000
4000
5000
6000
7000
0 5 10 15 20 25 30Measured Depth Rig Days
WELL NAME: ODSN-20i
OPERATOR: Caelus Energy
MUD CO: Baroid
RIG: Nabors 19AC
SDL JOB: AK-AM-0903191168
Days vs. Depth
04 April 2013
Sperry SDL Arrived on Location
WELL NAME: ODSN-20i
OPERATOR: Caelus Energy
MUD CO: Baroid
RIG: Nabors 19AC
SDL JOB: AK-AM-0903191168
Days vs. Depth
04 April 2013
Sperry SDL Arrived on Location
WELL NAME: ODSN-20i, ODSN-20i PB1, & ODSN-20i PB2
OPERATOR: Caelus Energy Alaska, LLC
MUD CO: Halliburton - Baroid
RIG: Nabors 19AC
SDL JOB: AK-XX-0903191168
Days vs. Depth
12 March 2016
Sperry SDL Continued on Location
LOCATION: Oooguruk
AREA: North Slope Borough
STATE: Alaska
SPUD: 10-Mar-2016
TD: 28-Mar-2016
Commenced 14.5" Surface Hole Section
On Bot: 18:50 14 Mar 2016
TD PB1 Hole Section
2769' MD, 2082' TVD
Off Bot: 08:32 17 March 2016
POOH to check
BHA #4
22 Mar 2016
TD PB2 Hole Section
5942' MD, 3026' TVD
Off Bot: 12:04 22 March 2016
Sidetracked well
(ODSN-20i PB2)
23 March 2016
TD Surface Hole Section
6460' MD, 3204' TVD
Off Bot: 15:23 28 March 2016
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:HOLE SECTION:
EMPLOYEE NAME:DATE:
Halliburton Confidential Document v 3.0
Alaska
Oooguruk
North Slope Borough
ODSN-20i
Caelus Energy Alaska, LLC
AK-XX-0903191168
Nabors 19AC
Beverly Hur 28-Mar-2016
What went as, or better than, planned:
Gas gear was well calibrated and this was reflected in the gas data collected both by the THA and the
GC. Blowbacks at every connection kept the lines clear and dry. The CVE also performed well.
Difficulties Experienced:
IRIS shut down but restarted without issue on March 15th. It shut down again on March 19th but
restarted without issue again. However, shortly after IRIS was restarted the stroke counter stopped
working. When configuration hardware was opened the datascan was not online. The datascan was
refreashed and the stroke counter resumed. We had one more shutdown, which caused us to loose
two minutes of data.
Surface
Recommendations:
Shut down the chromatograph before starting INSITE and restart it after INSITE is up and running.
This allows for a faster chromo connection and reduces lost data time.
Innovations and/or cost savings:
N/A
Surface Data Logging
After Action Review
WELL NAME:ODSN-20i, ODSN-20i PB1, & ODSN-20i PB2 LOCATION:Oooguruk
OPERATOR:Caelus Energy Alaska, LLC AREA:North Slope Borough
MUD CO:Halliburton - Bariod STATE:Alaska
RIG:Nabors 19AC SPUD:14-Mar-2016
SPERRY JOB:AK-AM-0903191168 TD:28-Mar-2016
Marker MD INC AZ TVD TVDSS
14.5" Surface Hole Section
Top of Permafrost 861.0 18.5 288.9 853.1 796.9
Base of Permafrost 1826.0 47.8 271.8 1668.4 1612.2
Ugnu D 1925.0 52.0 270.2 1732.0 1675.8
Formation Tops
ODSN-20i, ODSN-20i PB1, & ODSN-20i PB2
Caelus Energy Alaska, LLC
Halliburton - Baroid
Nabors 19AC
AK-XX-0903191168
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/R
6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++
12-Mar 0 - - - - - - - - - - - - - - - - - Rig moved to ODSN-20i
13-Mar 0 8.95 61 17 18 2/3/4 5.6 52/35/25/15/4/3 2/0 2.9 3.0/92.5 - - 11.1 - 0.40/1.20 29,500 360 Rig up on ODSN-20i
14-Mar 208 8.90 119 26 45 13/17/20 5.6 97/71/59/43/16/13 2/0 2.6 3.0/93.0 - 1.20 10.6 - 0.30/1.20 26,000 560 Drilling ahead
15-Mar 814 9.15 118 23 51 16/22/25 5.2 97/74/62/47/20/17 2/0 4.7 2.5/91.5 0.50 1.00 10.2 4.0 0.30/1.30 24,500 400 Reaming
16-Mar 1985 9.10 86 18 46 18/24/26 5.2 82/64/55/44/21/18 2/0 4.4 2.0/92.5 0.30 0.98 10.2 5.0 0.20/0.80 21,000 620 Drilling ahead
17-Mar 2789 9.15 64 15 39 17/25/29 6.0 69/54/49/39/19/17 2/0 4.8 2.0/92.0 0.25 1.30 10.6 7.5 0.20/0.80 22,000 600 Working tight spot
18-Mar 2815 9.25 64 16 38 16/23/26 5.6 70/54/45/37/19/17 2/0 5.4 5.1/0.3 0.20 1.20 10.2 7.5 0.20/0.70 21,000 420 Backreaming
19-Mar 2959 9.20 66 16 34 15/22/25 5.8 66/50/43/34/18/16 2/0 5.1 2.0/91.8 0.40 - 10.3 7.5 0.20/0.70 21,000 560 Reaming to bottom
20-Mar 4301 9.30 64 14 37 16/24/28 6.0 65/51/44/34/19/17 2/0 5.9 1.5/91.5 0.30 1.30 10.2 9.0 0.30/0.70 20,000 560 Drilling ahead
21-Mar 5528 9.45 53 11 30 14/24/30 6.8 52/41/35/28/17/15 2/0 6.8 1.5/90.5 0.25 0.95 10.0 11.0 0.20/0.70 22,000 620 Drilling ahead
22-Mar 5942 9.25 68 14 32 14/27/30 5.8 60/46/39/31/17/15 2/0 5.4 1.5/92.0 0.20 1.00 10.0 10.0 0.20/0.60 21,000 680 Laying down BHA
23-Mar 5942 9.20 64 12 32 14/25/28 6.2 56/44/36/29/18/16 2/0 5.1 1.5/92.3 0.20 1.20 10.2 10.0 0.30/0.60 22,000 520 Troughing for sidetrack
24-Mar 2947 9.30 68 19 35 13/18/23 5.6 73/54/44/33/16/14 2/0 5.7 1.5/91.5 0.25 1.00 10.0 11.0 0.40/1.00 24,000 640 Laying down BHA
25-Mar 3793 9.35 63 15 34 14/21/24 5.8 64/49/41/31/16/14 2/0 5.2 1.5/92.0 0.25 0.80 10.0 10.0 0.20/0.40 23,500 780 Drilling ahead
26-Mar 5089 9.45 60 15 30 15/27/60 6.4 60/45/39/31/17/15 2/0 6.4 1.0/91.5 0.20 1.95 10.2 12.5 0.30/0.50 24,000 640 Troughing
27-Mar 5647 9.30 62 14 34 16/32/38 6.6 62/47/42/34/19/17 2/0 5.6 1.5/92.0 0.23 1.20 10.3 12.5 0.35/0.90 23,000 560 Drilling ahead
28-Mar 6460 9.45 66 18 35 16/29/33 5.8 71/53/45/34/18/16 2/0 6.1 4.0/88.3 0.20 1.50 10.4 15.0 0.40/1.00 23,000 620 BROOH
29-Mar 6460 9.30 48 10 25 13/24/29 8.4 46/36/29/22/13/12 2/0 5.8 3.0/90.0 0.60 1.50 9.5 12.5 0.40/1.00 22,000 600 RIH w/ 11 3/4" casing
30-Mar 6460 9.35 54 10 25 14/26/31 8.8 45/35/28/22/14/12 2/0 5.8 3.0/90.0 0.20 0.60 9.5 12.5 0.35/0.85 22,000 540 Laying down 11 3/4" casing
31-Mar 6460 9.40 51 11 21 15/26/31 9.4 43/32/26/20/12/11 2/0 6.3 2.0/90.5 0.20 0.70 10.3 12.5 0.35/0.70 22,000 540 Running 11 3/4" casing
1-Apr 6460 9.50 49 10 19 11/18/21 9.6 39/29/20/19/11/10 2/0 7.4 2.0/89.5 0.20 0.70 10.2 12.5 0.35/0.75 22,000 540 Pulling 11 3/4" casing
2-Apr 6460 9.60 51 15 21 12/25/27 7.0 51/36/32/23/12/11 2/0 7.9 2.0/89.0 0.15 0.30 9.8 12.5 0.15/0.60 22,000 540 Tripping in the hole
3-Apr 6460 9.25 45 12 20 11/24/27 4.8 44/32/25/20/9/8 2/0 5.3 2.0/91.5 0.20 0.75 10.3 12.5 0.35/0.75 22,000 420 Running 11 3/4" casing
4-Apr 6460 9.45 42 11 16 6/12/24 5.0 38/27/20/13/5/3 2/0 6.8 1.0/91.0 0.15 0.40 9.9 12.5 0.25/0.45 22,000 440 Pulling 11 3/4" casing
5-Apr 6460 9.50 41 10 13 3/5/6 6.0 33/23/17/12/4/3 2/0 7.3 1.0/90.5 0.20 0.30 9.5 12.5 0.15/0.35 22,000 320 P&A Well
6-Apr 6460 -----------------Rig Down, Rig Released
Casing Record
LOCATION:
16" Conductor @ 158' MD, 158'TVD
WELL NAME:Oooguruk
OPERATOR:AREA:North Slope Borough
MUD CO:STATE:Alaska
RIG:SPUD:
Remarks
14-Mar-2016
SDL JOB:TD:28-Mar-2016
Surface - Spud Mud Water and Oil Based Mud Record
ODSN-20i, ODSN-20i PB1, & ODSN-20i PB2
BHA#SDL
RUN #Bit #Bit Type Bit Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
1 100 1 Baker/Hughes VM-1 14.5"158'2769 2611 48.02 0.994 92 24 60 1120 530 2-3-WT-A-E-1-CT-BHA Surface PB1 TD
2 200 2 Baker/Hughes VM-3 14.5"2769 2769 0 6.25 0.994 -----0-0-NO-A-E-I-NO-HP Clean Out
3 300 2rr Baker/Hughes VM-3 14.5"2427 2959 532 6455 0.994 104 20 60 1100 535 1-1-WT-A-E-I-NO-BHA Surface
4 400 3 Baker/Hughes VM-3 14.5"2959 5942 2983 120.71 0.994 67 35 80 2280 850 Lost in Hole Surface PB2 TD
5 500 4 Baker/Hughes VM-3 14.5"5942 5942 0 0.66 0.994 -----0-0-NO-A-E-I-NO-BHA Clean Out
6 600 4rr1 Baker/Hughes VM-3 14.5"2024 2947 923 19.23 0.994 89 20 80 1380 600 1-2-WT-A-E-I-NO-BHA Surface
7 700 5 Baker/Hughes VM-3 14.5"2947 6460 3513 98.31 0.994 75 35 80 2450 850 2-2-WT-C1,C2-F-1-NO-TD Surface TD
8 800 2rr2 Baker/Hughes VM-3 14.5"6460 6460 0 3.13 0.994 -----1-1-NO-A-E-I-NO-TD Clean Out
9 900 2rr3 Baker/Hughes VM-3 14.5"6460 6460 0 14.01 0.994 -----1-1-BU-A-E-I-NO-TD Clean Out
WELL NAME:LOCATION:Oooguruk
OPERATOR:Caelus Energy Alaska, LLC AREA:North Slope Borough
MUD CO:
SDL JOB:AK-XX-0903191168 TD:28-Mar-2016
Halliburton - Baroid STATE:Alaska
RIG:Nabors 19AC SPUD:14-Mar-2016
Bit Record
.
.
*
24 hr Recap:
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
Bottoms Up
Time
(max)(current)
Cly
Set AtSize Grade
907-670-6636Unit Phone:Beverly Hur
Maximum
Report By:Logging Engineers:Kerry garner / Beverly Hur
-
-
Units*
Casing
Summary
Lithology (%)
MBT
-
pH
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
- -
C-5n
-
C-2
N/A
in
N/AMinimum
Depth
Time:
Rig moved to ODSN-20i and began to spot and level the rig.
N/A
0'
0'
0'
Max @ ft Current
- -
Date:
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
(current)
J. Polya & J. Petitjean
ShClyst TuffGvlCoal
cP
-
-
Footage
-
Ss
(ppb Eq)
C-1 C-5i
Moving Rig
PV
24 hr Max
Weight
Hours
C-3
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
-
-
- - - -
Depth in / out
Mud Type
Lst
Type
Average
- - Background (max)
Trip
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
- - -
WOB
100% Gas In Air=10,000 Units - Connection
Condition
-
Bit #
-
-
-
-
-
-
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
ROP
ROP (ft/hr)
@
Mud Data
Depth
12-Mar-2016
12:00 AM
Current Pump & Flow Data:
-
Max
Chlorides
mg/l
-
Installed and upgraded new computer in the unit. Calibrated gas gear in preparation for the new well.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Completed rig up of gas equipment and completed a second gas calibration on all gas gear. Ran a bag test.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
-
13-Mar-2016
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
@
Mud Data
Depth
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
-
Bit #
-
-
-
-
-
-
Size
ODSN-20i, rigged up and connected to deverter system.
100% Gas In Air=10,000 Units - Connection
Tools
API FL
Chromatograph (ppm)
- - -
WOB
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
- Background (max)Trip
Average
-
Mud Type
Lst
Type
-
- - - -
Depth in / out
YP
(lb/100ft2)
-
CementChtSilt
C-4i C-4n
24 hr Max
Weight
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
Rig up on ODSN-20i
PV
-
Footage
-
J. Polya & J. Petitjean
ShClyst TuffGvlCoal
cP
-
Gas Summary
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
0'
0'
0'
Max @ ft Current
- -
Date:
Time:
All tests demonstrated good calibrations and were recorded in the well folder. Pits filled with spud mud. Rig leveled over
N/A
in
N/AMinimum
Depth C-5n
-
C-2
N/A
SPP (psi)
Gallons/stroke
TFABit Type
Depth
- -
MBT
-
pH
-
Siltst
-
-
Units*
Casing
Summary
Lithology (%)
907-670-6636Unit Phone:Beverly Hur
Maximum
Report By:Logging Engineers:Kerry garner / Beverly Hur
Set AtSize Grade
(max)(current)
Cly
Bottoms Up
TimeVolumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Prepared the logs for drilling surface. Checked all gas lines and equipment. Commenced drilling at 18:50.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
26000.00
14-Mar-2016
12:00 AM
Current Pump & Flow Data:
473
Max
Surface
ROP
ROP (ft/hr)
@
Mud Data
Depth
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
-
Bit #
-
2.6
-
8.90
-
8.90
Size
Gas: There was no gas while drilling and no connection gas
158'
100% Gas In Air=10,000 Units0Connection
Tools
API FL
Chromatograph (ppm)
- - -
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
0Background (max)Trip
Average
-
Mud Type
Lst
Type
-
Spud Mud 5.6208'45
Depth in / out
YP
(lb/100ft2)
10.60
CementChtSilt
C-4i C-4n
24 hr Max
Weight
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
Drilling Ahead
PV
-
Footage
-
J. Polya & J. Petitjean
ShClyst TuffGvlCoal
cP
26
Gas Summary
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
273.0 Flow In (gpm)
Flow In (spm)
0'
254'
254'
Max @ ft Current
281'21.0
Date:
Time:
Fluids: 0 barrels were lost downhole.
Rig is drilling ahead with surface clean out run.
0
in
0Minimum
Depth C-5n
145.7
C-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
- 119
MBT
-
pH
-
Siltst
406
434
Units*
Casing
Summary
Lithology (%)
907-670-6636Unit Phone:Beverly Hur
Maximum
Report By:Logging Engineers:Kerry garner / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
Cly
Bottoms Up
Time
44.63 - 44347.68 3.05 10
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Picked up the BHA. Tripped in the hole and began drilling ahead. Pumps on washing to bottom.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
24500
0
15-Mar-2016
12:00 AM
Current Pump & Flow Data:
825
Max
Surface
ROP
ROP (ft/hr)
4.18 @
Mud Data
Depth
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
NEW
Bit #
1
4.7
14.5"
9.15
Baker/Hughes VM-1
9.15
Size
Drilled from 281' MD to 907' MD with a max drill gas of 60 units at 803' MD and a max connection gas of 53 units at 813' MD.
Cleared the flow line. Checked all gas lines, CVE, and Degasser. All lines and equipment were free and clear of mud and debris.
Drilled ahead to 879' MD, took survey shots and serviced the rig. Backreamed from 792' MD when the flow line packed off.
158'
100% Gas In Air=10,000 Units53Connection
-
0
Tools
API FL
Chromatograph (ppm)
- 158' -
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
3Background (max)Trip
Average
-
Mud Type
Lst
- -
Type
-
Spud Mud 5.2814'51
Depth in / out
YP
(lb/100ft2)
10.20
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Reaming
PV
-
Footage
-
J. Polya & J. Petitjean
ShClyst
- -
TuffGvlCoal
cP
23
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
268.9 Flow In (gpm)
Flow In (spm)
281'
907'
626'
Max @ ft Current
368'178.8
Date:
Time:
Fluids: 0 barrels were lost downhole.
Adding water to the pits with the centrifuge and desilter on. Began backreaming at 717' MD due to high dog leg.
18
Reaming at time of report.
in
3 791'Minimum
Depth C-5n
803'
104.9
C-2
60
SPP (psi)
Gallons/stroke
TFABit Type
Depth
4.0118
MBT
-
pH
0.994
0
0
0
Siltst
498
58
Units*
Casing
Summary
Lithology (%)
0
-
2324
251
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnagi / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
9069
-
Bottoms Up
Time
138.22 - 1372148.9 10.68 24 min
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Drilled ahead from 907' MD to the base of the Permafrost at 1826' MD. Average gas values at the base of the
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
21000
0
15-Mar-2016
12:00 AM
Current Pump & Flow Data:
6
Max
Surface
ROP
ROP (ft/hr)
0.00 @
Mud Data
Depth
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
NEW
Bit #
1
4.4
14.5"
9.30
Baker/Hughes VM-1
9.10
Size
Currently drilling ahead at 2210' MD.
values of 11-13 units throughout. Our max gas was 71 units at 1150' MD and in the Permafrost.
158'
100% Gas In Air=10,000 Units52Connection
-
0
Tools
API FL
Chromatograph (ppm)
- 158' -
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
3Background (max)Trip
Average
-
Mud Type
Lst
- -
Type
-
Spud Mud 5.21985'46
Depth in / out
YP
(lb/100ft2)
10.20
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Drilling Ahead
PV
-
Footage
-
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
18
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
155.0 Flow In (gpm)
Flow In (spm)
907'
2211'
1304'
Max @ ft Current
1408'104.7
Date:
Time:
Fluids: 0 barrels were lost downhole.
Permafrost were 20 units and comprised entirely of methane. Continued to drill ahead to the Ugnu at 1925' MD with gas
14
in
3 522'Minimum
Depth C-5n
1150'
142.4
C-2
71
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.086
MBT
-
pH
0.994
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
0
-
2099
41
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
11196
-
Bottoms Up
Time
380.15 - 3775421.07 40.91 31
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Continued drilling ahead in the Ugnu from 2210’ MD to 2769’ MD. Observed a max drill gas of 47 units
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
22000
0
17-Mar-2016
12:00 AM
Current Pump & Flow Data:
168
Max
Surface
ROP
ROP (ft/hr)
0.00 @
Mud Data
Depth
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
NEW
Bit #
1
4.8
14.5"
-
Baker/Hughes VM-1
9.15
Size
hole to change bend in the motor and change out the bit. Gas gear was calibrated while the rig laid down the BHA.
158'
100% Gas In Air=10,000 Units49Connection
-
0
Tools
API FL
Chromatograph (ppm)
- 158' -
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
8Background (max)Trip
Average
-
Mud Type
Lst
- -
Type
-
Spud Mud 6.02769'39
Depth in / out
YP
(lb/100ft2)
10.60
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Working Tight Spot
PV
-
Footage
-
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
15
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
229.8 Flow In (gpm)
Flow In (spm)
2210'
2769'
559'
Max @ ft Current
2670'127.2
Date:
Time:
Fluids: 0 barrels were lost downhole.
at 2576’ MD and an average drill gas of 19 units. The max connection gas was 49 units at 2304’ MD. Back reamed out of the
19
in
2 2363'Minimum
Depth C-5n
2576'
0.0
C-2
47
SPP (psi)
Gallons/stroke
TFABit Type
Depth
7.564
MBT
-
pH
0.994
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
0
-
2071
96
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
7929
-
Bottoms Up
Time
272.45 - 2705299.89 27.43 45
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Tripped in the hole from 631’ MD to 2339’ MD working as directed through tight spots. Determined the well
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
21000
0
18-Mar-2016
12:00 AM
Current Pump & Flow Data:
770
Max
Surface
ROP
ROP (ft/hr)
9.00 @
Mud Data
Depth
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
NEW
Bit #
1
5.4
14.5"
-
Baker/Hughes VM-1
9.25
Size
average of 15 units. Our max connection gas was 16 units at 2773’ MD.
to 2525’ MD without issues and continued to drill ahead. Our max gas was 78 units in the Ugnu D at 2526’ MD with an
158'
100% Gas In Air=10,000 Units16Connection
-
0
Tools
API FL
Chromatograph (ppm)
- 158'2769'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
10Background (max)Trip
Average
-
Mud Type
Lst
- -
Type
-
Spud Mud 5.62815'38
Depth in / out
YP
(lb/100ft2)
10.20
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Back Reaming
PV
2611'
Footage
-
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
16
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
226.9 Flow In (gpm)
Flow In (spm)
2769'
2959'
190'
Max @ ft Current
2947'133.0
Date:
Time:
Fluids: 0 barrels were lost downhole.
had been sidetracked at 2427’ MD in the Ugnu D. Took survey shots and pulled two stands to 2308’ MD. Tripped in the hole
15
in
3 2616'Minimum
Depth C-5n
2526'
187.8
C-2
78
SPP (psi)
Gallons/stroke
TFABit Type
Depth
7.564
MBT
-
pH
0.994
0
0
0
Siltst
448
49
Units*
Casing
Summary
Lithology (%)
0
-
2199
111
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
12093
-
Bottoms Up
Time
498.45 - 4949554.18 55.73 101
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap: Backreamed out of the hole from 2866’ MD to 624’ MD with a tight spot observed at 1566’ in the Permafrost.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
21000
19-Mar-2016
12:00 AM
Current Pump & Flow Data:
47
Max
NEW
Surface
ROP
ROP (ft/hr)
0.00 @
Mud Data
Depth
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
0-0-NO-A-E-I-NO-HP
Bit #
2rr
5.1
14.5"
-
Baker/Hughes VM-3
9.20
Size
4
158'
100% Gas In Air=10,000 Units - Connection
-
Tools
API FL
Chromatograph (ppm)
- 2355' 2959'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
5Background (max)Trip
Average
39
Mud Type
Lst
- -
Type
-
Baker/Hughes VM-3
Spud Mud 5.8
2959'
2959'34
-
Depth in / out
YP
(lb/100ft2)
10.20
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Reaming to Bottom
PV
2611'
14.5"1.994
Footage
28.28
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
16
- -
Gas Summary
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
2959'
2959'
0'
Max @ ft Current
N/A
Date:
Time:
Fluids: 0 barrels were lost downhole.
Tripped in the hole to 2958’ MD and took survey shots. We had a max trip gas of 39 units with an average of 5 units.
N/A
in
N/AMinimum
Depth C-5n
0.0
C-2
N/A
SPP (psi)
Gallons/stroke
TFABit Type
Depth
9.066
MBT
-
pH
0.994
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
-
907-670-6636Unit Phone:Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
Cly
-
Bottoms Up
Time
511.08 - 5075568.33 57.25 41
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap: Drilling ahead in the Surface Section. Drilled from 2959’ MD in the Ugnu D formation, reaching the Top West Sak
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
20000
20-Mar-2016
12:00 AM
Current Pump & Flow Data:
1624
Max
NEW
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
0-0-NO-A-E-I-NO-HP
Bit #
2rr
5.9
14.5"
-
Baker/Hughes VM-3
9.30
Size
4
at 3153’ MD, all in the Ugnu D.
and as we approached the Top West Sak. We had an average of 17 units drill gas and a max connection gas of 30 units
158'
100% Gas In Air=10,000 Units30Connection
-
Tools
API FL
Chromatograph (ppm)
- 2355' 2959'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
8Background (max)Trip
Average
-
Mud Type
Lst
- -
Type
-
Baker/Hughes VM-3
Spud Mud 6.0
2959'
4301'37
-
Depth in / out
YP
(lb/100ft2)
10.20
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Drilling Ahead
PV
2611'
14.5"1.994
Footage
28.28
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
14
- -
Gas Summary
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
320.8 Flow In (gpm)
Flow In (spm)
2959'
4461'
1502'
Max @ ft Current
3482'138.7
Date:
Time:
Fluids: 0 barrels were lost downhole.
at 3419’ MD / 2307.9 TVD. Continued drilling ahead to 4461’ MD. Our max drill gas was 33 units at 3416’ MD in the Ugnu D
17
in
2 4206'Minimum
Depth C-5n
3416'
17.8
C-2
33
SPP (psi)
Gallons/stroke
TFABit Type
Depth
9.064
MBT
-
pH
0.994
Siltst
745
175
Units*
Casing
Summary
Lithology (%)
-
2716
39
907-670-6636Unit Phone:Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
Cly
5641
-
Bottoms Up
Time
772.51 - 7670862.43 89.92 44
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Drilling ahead in the Surface Section. Drilled from 4461’ MD in the West Sak formation, reaching the top of the
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
21000
0
21-Mar-2016
12:00 AM
Current Pump & Flow Data:
2062
Max
NEW
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
0-0-NO-A-E-I-NO-HP
Bit #
2rr
6.9
14.5"
-
Baker/Hughes VM-3
9.35
Size
4
and our max connection gas was 19 units at 5483’ MD, both in the Cretaceous Tuff. We had an average of 9 units of drill gas.
158'
100% Gas In Air=10,000 Units19Connection
-
0
Tools
API FL
Chromatograph (ppm)
-
20.02355' 2959'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
9Background (max)Trip
Average
-
Mud Type
Lst
- -
Type
-
60.0
Baker/Hughes VM-3
Spud Mud 6.5
2959'
5195'31
-
Depth in / out
YP
(lb/100ft2)
10.30
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Drilling Ahead
PV
2611'
14.5"1.994
Footage
- -
28.28
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
12
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
224.0 Flow In (gpm)
Flow In (spm)
4461'
5606'
1145'
Max @ ft Current
5203'72.4
Date:
Time:
Fluids: 0 barrels were lost downhole.
Cretaceous Tuff at 5381’ MD / 2855.3 TVD. Continued drilling ahead to 5606’ MD. Our max drill gas was 19 units at 5514’ MD
9
in
2 4785'Minimum
Depth C-5n
5514'
20.6
C-2
19
SPP (psi)
Gallons/stroke
TFABit Type
Depth
10.056
MBT
-
pH
0.994
0
0
0
Siltst
847
200
Units*
Casing
Summary
Lithology (%)
0
-
1119
31
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
2795
-
Bottoms Up
Time
971.81 - 96491086.63 114.82 48
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Drilled from 5606’ MD to 5669’ MD in the Cretaceous Tuff. Continued drilling ahead to 5942’ MD
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
21000
9
22-Mar-2016
12:00 AM
Current Pump & Flow Data:
8
Max
NEW
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Condition
0-0-NO-A-E-I-NO-HP
Bit #
2rr
5.4
14.5"
-
Baker/Hughes VM-3
9.25
Size
4
We had an average of 16 units of drill gas.
gas was 36 units at 5829’ MD and our max connection gas was 27 units at 5762’ MD, both in the Cretaceous Tuff.
158'
100% Gas In Air=10,000 Units27Connection
-
7
Tools
API FL
Chromatograph (ppm)
-
20.02355' 2959'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
3Background (max)Trip
Average
20
Mud Type
Lst
- -
Type
-
60.0
Baker/Hughes VM-3
Spud Mud 5.8
2959'
5942'32
-
Depth in / out
YP
(lb/100ft2)
10.00
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
2483
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Laying down BHA
PV
2611'
14.5"1.994
Footage
- -
28.28
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
14
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
176.2 Flow In (gpm)
Flow In (spm)
5606'
5942'
336'
Max @ ft Current
5765'43.7
Date:
Time:
Fluids: 0 barrels were lost downhole.
and experienced a drop in pressure. Tripped out of the hole to check the motor and laid down the BHA. Our max drill
16
in
2 5835'Minimum
Depth C-5n
5829'
0.0
C-2
36
SPP (psi)
Gallons/stroke
TFABit Type
Depth
10.068
MBT
-
pH
0.994
0
5
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
0
-
5572
23
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
40
0
Cly
5321
-
Bottoms Up
Time
- - - - - -
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Laid down the BHA and tripped in the hole to 2124’ MD. Tried to orient through stacking out.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
22000
23-Mar-2016
12:00 AM
Current Pump & Flow Data:
673
Max
0-0-NO-A-E-I-NO-BHA
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
ConditionBit #
5.1 - 9.20
Size
4rr1
We had a max trip gas of 16 units and an average of 3 units.
Picked up the BHA, tripped in the hole to 2024’ MD and began troughing for the sidetrack.
158'
100% Gas In Air=10,000 Units - Connection
-
Tools
API FL
Chromatograph (ppm)
-
- - -
WOB
H-40
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
5Background (max)
Trip
Average
16
Mud Type
Lst
- -
Type
-
-
Baker/Hughes VM-3
Spud Mud 6.2
-
5942'32
-
Depth in / out
YP
(lb/100ft2)
10.20
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Troughing for Sidetrack
PV
-
14.5 0.994
Footage
- -
-
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
12
- -
Gas Summary
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
5942'
2024'
-
Max @ ft Current
- 4.2
Date:
Time:
Fluids: 0 barrels were lost downhole.
Tripped out of the hole and laid down the BHA. Performed a rig maintenance and cut and slip the drill line.
N/A
in
N/AMinimum
Depth C-5n
3.6
C-2
N/A
SPP (psi)
Gallons/stroke
TFABit Type
Depth
10.064
MBT
-
pH
0.994
Siltst
448
106
Units*
Casing
Summary
Lithology (%)
-
907-670-6636Unit Phone:Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
Cly
-
Bottoms Up
Time
- - - - - -
Baker/Hughes VM-3 14.5"4 0-0-NO-A-E-I-NO-BHA
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap: Kickoff point for the sidetrack began at 2024’ MD in the Ugnu D formation. Drilled ahead to 2947’ MD;
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
2400
0
24-Mar-2016
12:00 AM
Current Pump & Flow Data:
7
Max
0-0-NO-A-E-I-NO-BHA
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
ConditionBit #
5.7 - 9.30
Size
4rr1
We had a max connection gas of 39 units at 2481’ MD and an average of 19 units.
158'
100% Gas In Air=10,000 Units39Connection
-
0
Tools
API FL
Chromatograph (ppm)
-
- 5942' 5942'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
3Background (max)
Trip
Average
-
Mud Type
Lst
- -
Type
-
-
Baker/Hughes VM-3
Spud Mud 5.6
-
2947'35
-
Depth in / out
YP
(lb/100ft2)
10.00
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Laying down BHA
PV
0'
14.5 0.994
Footage
- -
0.00
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
19
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
287.9 Flow In (gpm)
Flow In (spm)
2024'
2947'
923'
Max @ ft Current
2914'119.3
Date:
Time:
Fluids: 0 barrels were lost downhole.
backreamed out of the hole to change the motor bend. We had a max drill gas of 64 units at 2158’ MD and an average of 17 units.
17
in
3 2347'Minimum
Depth C-5n
2157'
0.0
C-2
64
SPP (psi)
Gallons/stroke
TFABit Type
Depth
11.062
MBT
-
pH
0.994
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
0
-
2317
27
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
4003
-
Bottoms Up
Time
- - - - - -
Baker/Hughes VM-3 14.5"4 New
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap: Picked up the BHA and set the bend in the motor. Tripped in the hole and began drilling ahead from
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
23500
0
25-Mar-2016
12:00 AM
Current Pump & Flow Data:
1449
Max
New
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
ConditionBit #
5.2 - 9.35
Size
5
and the average was 17 units.
158'
100% Gas In Air=10,000 Units26Connection
-
4
Tools
API FL
Chromatograph (ppm)
-
- 2024' 2947'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
15Background (max)
Trip
Average
-
Mud Type
Lst
- -
Type
-
-
Baker/Hughes VM-3
Spud Mud 5.8
2947'
3793'34
-
Depth in / out
YP
(lb/100ft2)
9.90
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Drilling Ahead
PV
923'
14.5 0.994
Footage
- -
-
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
15
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
229.7 Flow In (gpm)
Flow In (spm)
2947'
3972'
1025'
Max @ ft Current
3913'128.5
Date:
Time:
Fluids: 0 barrels were lost downhole.
2947’ MD to 3972’ MD. Max drill gas was 27 units with an average of 14 units. Max connection gas was 26 units
14
in
2 2947'Minimum
Depth C-5n
3071'
211.5
C-2
27
SPP (psi)
Gallons/stroke
TFABit Type
Depth
10.063
MBT
-
pH
0.994
0
0
0
Siltst
694
164
Units*
Casing
Summary
Lithology (%)
0
-
2112
26
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
4163
-
Bottoms Up
Time
687.77 - 6829767.21 79.44 42
Baker/Hughes VM-3 14.54rr1 0-0-NO-A-E-I-NO-BHA
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap: Drilled the surface section from 3972’ MD to 4620’ MD and took survey shots. Drilled ahead to 5089’ MD;
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
24000
0
26-Mar-2016
12:00 AM
Current Pump & Flow Data:
1946
Max
New
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
ConditionBit #
6.2 - 9.45
Size
5
was 25 units at 4168’ MD with an average of 11 units. Max connection gas was 22 units at 4717’ MD with an average of 14 units.
158'
100% Gas In Air=10,000 Units22Connection
-
0
Tools
API FL
Chromatograph (ppm)
-
20.02024' 2947'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
4Background (max)
Trip
Average
-
Mud Type
Lst
- -
Type
-
80.0
Baker/Hughes VM-3
Spud Mud 6.4
2947'
5089'30
-
Depth in / out
YP
(lb/100ft2)
10.20
000
00
CementChtSilt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Troughing
PV
923'
14.5 0.994
Footage
- -
19.23
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
15
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
271.2 Flow In (gpm)
Flow In (spm)
3972'
5089'
1117'
Max @ ft Current
4610'121.2
Date:
Time:
Fluids: 0 barrels were lost downhole.
backreamed to 4969’ MD. Racked back one stand, oriented the tool to the low side, and began troughing. Max drill gas
11
in
3 4380'Minimum
Depth C-5n
4168'
101.6
C-2
25
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.560
MBT
-
pH
0.994
0
0
0
Siltst
842
199
Units*
Casing
Summary
Lithology (%)
0
-
1155
49
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
4130
-
Bottoms Up
Time
877.32 - 8711980.45 103.13 44
Baker/Hughes VM-3 14.54rr1 1-2-WT-A-E-NO-BHA
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:
Baker/Hughes VM-3 14.54rr1 1-2-WT-A-E-NO-BHA
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
Bottoms Up
Time
990.11 - 98311107.33 117.22 49
(max)(current)
26
0
Cly
3509
-
Set AtSize
107.0 -
Grade
16.00''
907-670-6636Unit Phone:
0
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
-
1253
16
837
198
Units*
Casing
Summary
Lithology (%)
0
MBT
-
pH
0.994
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.562
C-5n
5610'
30.2
C-2
25
in
2 5245'Minimum
Depth
Time:
Fluids: 0 barrels were lost downhole.
Drilled ahead to 5555.97’ MD; encountered slow drilling rates until 5709’ MD, midnight depth. Max gas was 25 units at
12
5089'
5709'
620'
Max @ ft Current
5183'61.1
Date:
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
160.5 Flow In (gpm)
Flow In (spm)
- -
Gas Summary
0
0 0
(current)
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
14
923'
14.5 0.994
Footage
- -
19.23
-
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Drilling Ahead
PV
-
24 hr Max
Weight
10
Hours
C-3
-
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
10.30
000
-
80.0
Baker/Hughes VM-3
Spud Mud 6.6
2947'
5647'34
-
Depth in / out
Mud Type
Lst
- -
Type
Average
- 15Background (max)
Trip
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
-
20.02024' 2947'
WOB
H-40
100% Gas In Air=10,000 Units22Connection
-
4
5
5610’ MD in the Cretaceous Tuffs with an average of 12 units. Max connection gas was 22 units at 5555’ MD.
158'
ConditionBit #
5.3 - 9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
New
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
27-Mar-2016
12:00 AM
Current Pump & Flow Data:
2171
Max
0
Chlorides
mg/l
23000
Reamed from 5047’ MD to 5068’ MD and drilled ahead to 5192’ MD, the unofficial top of the Cretaceous Tuff.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
Baker/Hughes VM-3 14.54rr1 1-2-WT-A-E-NO-BHA
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
Bottoms Up
Time
1120.82 - 111291254.38 133.56 56
(max)(current)
219
0
Cly
26980
-
Set AtSize
107.0 -
Grade
16.00''
907-670-6636Unit Phone:
45
Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
-
3755
64
0
0
Units*
Casing
Summary
Lithology (%)
16
MBT
-
pH
0.994
0
63
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
15.066
C-5n
-
C-2
191
in
5 6045'Minimum
Depth
Time:
Fluids: 0 barrels were lost downhole.
of the hole to 4800’ MD. Max drill gas was 61 units at 6024’ MD with an average 27 units. There was a max gas of 191 units while
27
5709'
6460'
751'
Max @ ft Current
6211'83.6
Date:
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
160.0 Flow In (gpm)
Flow In (spm)
- -
Gas Summary
0
106 43
(current)
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
18
923'
14.5 0.994
Footage
- -
19.23
-
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
BROOH
PV
-
24 hr Max
Weight
41
Hours
C-3
-
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
10.40
123012
-
80.0
Baker/Hughes VM-3
Spud Mud 5.8
2947'
6460'35
-
Depth in / out
Mud Type
Lst
- -
Type
Average
- 8Background
(max)
Trip
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
-
20.02024' 2947'
WOB
H-40
100% Gas In Air=10,000 Units66Connection
-
133
5
backreaming and a max connection gas of 66 units at 6021’ MD.
158'
ConditionBit #
6.1 - 9.45
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
New
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
28-Mar-2016
12:00 AM
Current Pump & Flow Data:
3
Max
20
Chlorides
mg/l
23000
Drilled ahead from 5709’ MD to 6460’ MD; completed Surface Section at 6460’ MD / 3204’ TVD. Backreamed out
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
Baker/Hughes VM-3 14.54rr1 1-2-WT-A-E-NO-BHA
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
Bottoms Up
Time
- - - - - -
(max)(current)
L-80
Cly
-
Set AtSize
107.0 -
Grade
16.00''
907-670-6636Unit Phone:Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
-
113/4"
0
0
Units*
Casing
Summary
Lithology (%)
-
MBT
-
pH
0.994
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.548
C-5n
-
-
C-2
N/A
in
N/A - Minimum
Depth
Time:
Fluids: 0 barrels were lost downhole.
Began running in the hole with 11 ¾” casing from surface to 2020’ MD. We had 138 units of gas while backreaming.
N/A
6460'
6460'
0'
Max @ ft Current
- -
Date:
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
- -
Gas Summary
(current)
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
10
923'
14.5 0.994
Footage
98.31 3513'
19.23
-
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
RIH with 11 3/4" casing
PV
-
24 hr Max
60.0
Weight
Hours
C-3
-
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.50
80
80.0
Baker/Hughes VM-3
Spud Mud 8.4
2947'
6460'26
6460'
Depth in / out
Mud Type
Lst
- -
Type
Average
- 3Background (max)
Trip
- -
Avg Min
Comments
Surface
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
35
20.02024' 2947'
WOB
H-40
100% Gas In Air=10,000 Units138Circulation
-
5
-
158'
ConditionBit #
5.8 - 9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
2-2-WT-C1, C2-F-1-NO
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
29-Mar-2016
12:00 AM
Current Pump & Flow Data:
29
Max
Chlorides
mg/l
22000
Finished backreaming out of the hole to surface and laid down the bottom hole assembly.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
Baker/Hughes VM-3 14.54rr1 1-2-WT-A-E-NO-BHA
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
Bottoms Up
Time
- - - - - -
(max)(current)
-
Cly
-
Set AtSize
107.0 -
Grade
16.00''
907-670-6636Unit Phone:Beverly Hur
Maximum
Report By:Logging Engineers:Martin Nnaji / Beverly Hur
-
-
0
0
Units*
Casing
Summary
Lithology (%)
-
MBT
-
pH
0.994
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.554
C-5n
-
-
C-2
N/A
in
N/A - Minimum
Depth
Time:
Fluids: 0 barrels were lost downhole.
the hole and laid down casing to surface. There was a max trip gas of 66 units.
N/A
6460'
6460'
0'
Max @ ft Current
- -
Date:
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
- -
Gas Summary
(current)
J. Polya & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
10
923'
14.5 0.994
Footage
98.31 3513'
19.23
-
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Lay down 11 3/4" casing
PV
-
24 hr Max
-
Weight
Hours
C-3
-
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.50
80
80.0
Baker/Hughes VM-3
Spud Mud 8.8
2947'
6460'25
6460'
Depth in / out
Mud Type
Lst
- -
Type
Average
662Background (max)
Trip
- -
Avg Min
Comments
-
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
35
20.02024' 2947'
WOB
H-40
100% Gas In Air=10,000 Units - Circulation
-
5
-
158'
ConditionBit #
5.8 - 9.35
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
2-2-WT-C1, C2-F-1-NO
Surface
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
30-Mar-2016
12:00 AM
Current Pump & Flow Data:
8
Max
Chlorides
mg/l
22000
Ran in the hole with 11 ¾” casing to 2025’ MD; stacked out at 2065’ MD. Tripped out of
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Rigged down and sent out the Tesco tools. Picked up the cleanout BHA #8, uploading MWD tools at 65’ MD. Tripped in the
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
22,000
0
31-Mar-2016
11:59 PM
Current Pump & Flow Data:
0
Max
2-2-WT-C1, C2-F-1-NO
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
ConditionBit #
6.3 - 9.40
Size
5
Gas: Max Trip : 14 units @ 10:44; Avg Trip : 3 units
MD and repeated at 90 right orientation without problems. Tripped out of the hole from 2195’ MD to 620’ MD and laid down BHA #8 to the
2185’ MD without issues and pulled up to 1950’ MD. Oriented to 90 left and ran in the hole to 2195’ MD without issues. Pulled back to 1950’
between 1850’ MD and 2296’ MD at flow rates between 0 and 650 GPM. Oriented the motor low side and ran in the hole from 1850’ MD to
158'
100% Gas In Air=10,000 Units - Circulation
-
4
Tools
-
API FL
Chromatograph (ppm)
35
202024' 2947'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background
(max)
Trip
Average
14
Mud Type
Lst
- -
Type
80
80
Baker/Hughes VM-3
Spud Mud 9.4
2947'
6460'21
6460'
Depth In / Out
YP
(lb/100ft2)
10.3
000
00
CementCht Silt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Running 11 3/4" Casing
PV
923'
14.5 0.994
Footage
98.31 3513'
19.23
R. Klepzig & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
11
- -
Gas Summary
0
8 4
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
6460'
6460'
0'
Max @ ft Current
- -
Date:
Time:
Downhole Fluid Gain/Loss (24 hours): 0 bbls
hole to 1610’MD, then began washing and reaming down to 2199’ MD at 3 BPM and 500 PSI. Reamed and back reamed several times
3
surface. A max gas of 14 units was observed during the trips in and out of the hole, as well as the reaming. Rigged up Tesco casing running
tools and began to run11 ¾” surface casing from surface to 692’ MD, cleaning galled threads on joint #4.
in
0 - Minimum
Depth C-5n
-
-
C-2
14
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.551
MBT
-
pH
0.994
0
5
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
0
-
137
0
907-670-6636Unit Phone:
0
David Durst
Maximum
Report By:Logging Engineers:Martin Nnaji / David Durst
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
12
0
Cly
1964
-
Bottoms Up
Time
- - - - - -
Baker/Hughes VM-3 14.54rr1 1-2-WT-A-E-NO-BHA
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:
Baker/Hughes VM-3 14.55 2-2-WT-C1, C2-F-1-NO-TD
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
Bottoms Up
Time
- - - - - -
(max)(current)
0
0
Cly
0
-
Set AtSize
107.0 -
Grade
16.00''
907-670-6636Unit Phone:
0
David Durst
Maximum
Report By:Logging Engineers:Martin Nnaji / David Durst
-
0
0
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
-
pH
0.994
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.549
C-5n
-
-
C-2
0
in
0 - Minimum
Depth
Time:
Downhole Fluid Gain/Loss (24 hours): 0 bbls
Removed all used casing from the pipe shed and loaded new joints. Continued to run casing from 732’ MD to 2113’ MD at 20 FPM.
0
6460'
6460'
0'
Max @ ft Current
- -
Date:
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
- -
Gas Summary
0
0 0
(current)
R. Klepzig & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
10
3513'
14.5 0.994
Footage
2.88 0'
98.31
-
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Pulling 11 3/4" Casing
PV
-
24 hr Max
Weight
0
Hours
C-3
-
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
10.2
000
-
80
Baker/Hughes VM-3
Spud Mud 9.6
6460'
6460'19
6460'
Depth In / Out
Mud Type
Lst
- -
Type
Average
00Background
(max)
Trip
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
-
352947' 6460'
WOB
H-40
100% Gas In Air=10,000 Units - Circulation
-
0
2rr2
Gas: Max Trip : 0 units; Avg Trip : 0 units
hole losses were observed during tripping operations.
the hole to 2135’ MD at 30 RPM, 22k ft-lbs torque. Pumped a dry job and pulled casing from 2135’ MD to 932’ MD. No gas or down
Ran casing from 2113’ MD to 2135, working through a tight spot at 30 RPM. Pulled 2 joints of casing to 2003’ MD, and ran back in
158'
ConditionBit #
7.4 - 9.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
1-1-NO-A-E-I-NO-TD
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
1-Apr-2016
11:59 PM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
22,000
Ran 11 ¾” casing from 692’ MD to 732’ MD. Had issues with galling threads on several joints of used casing.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Pulled casing from 932’ MD to 267’ MD, then cut the connections on the shoe track to surface. Rigged down Tesco
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
22,000
0
2-Apr-2016
11:59 PM
Current Pump & Flow Data:
0
Max
-
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
ConditionBit #
7.99.909.60
Size
2rr3
Gas: Max Trip : 0 units; Avg Trip : 0 units
MD, working tight spots from 2325’ MD to 2522’ MD at 300 GPM, 580 PSI standpipe pressure, 30 RPM, 7-11k ft-lbs torque. No gas
MD and 2243’ MD at 650 GPM, 1330 PSI standpipe pressure, 80-100 RPM, 5-12k ft-lbs torque. Continued to trip in the hole to 5409'
Tripped in the hole to 2243’ MD, pumping at 450 GPM through the sidetrack point at 1958’ MD. Backreamed 4 times between 1958’
158'
100% Gas In Air=10,000 Units0Circulation
-
0
Tools
Directional / Gamma
API FL
Chromatograph (ppm)
-
-6460' 6460'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background
(max)
Trip
Average
0
Mud Type
Lst
- -
Type
-
-
Baker/Hughes VM-3
Spud Mud 7.0
6460'
6460'21
-
Depth In / Out
YP
(lb/100ft2)
9.8
000
00
CementCht Silt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Tripping in the Hole
PV
0'
14.5 0.994
Footage
- -
2.88
R. Klepzig & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
15
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
6460'
6460'
0'
Max @ ft Current
- -
Date:
Time:
Downhole Fluid Gain/Loss (24 hours): 0 bbls
casing equipment and prepared to pick up BHA #9. Picked up BHA #9 from surface to 567’ MD, uploading MWD tools at 63’ MD.
0
or losses were observed during the days operations.
in
0 - Minimum
Depth C-5n
-
-
C-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.551
MBT
-
pH
0.994
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
0
-
0
0
907-670-6636Unit Phone:
0
David Durst
Maximum
Report By:Logging Engineers:Martin Nnaji / David Durst
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
0
-
Bottoms Up
Time
937.5 0 93091320.3 111.3 -
Baker/Hughes VM-3 14.52rr2 1-1-NO-A-E-I-NO-TD
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:Reamed and washed through tight hole from 5409’ MD to 6460’ MD at 300 gpm, 30 rpm. A max gas of 69 units was
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
22,000
-9
3-Apr-2016
11:59 PM
Current Pump & Flow Data:
0
Max
-
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
ConditionBit #
5.310.009.25
Size
2rr3
Gas: Max Trip : 69 units; Avg Trip : 10 units
stabilizers and the bit were packed off. Rigged up Tesco casing running tools and ran casing from surface to 730’ MD.
to fight tight hole issues, reducing to 450 gpm, 30-80 rpm. During back reaming operations, a down hole loss of 22 bbls was
backreaming from 5409’ MD to 5130’ MD and circulated a bottoms up at 650 gpm, 100 rpm. Backreamed to 4291’ MD, continuing
rpm. Had tight hole issues back reaming between 5660’ MD and 5409’ MD with torque between 11 and 34 ft-lbs. Continued
158'
100% Gas In Air=10,000 Units69Connection
-
0
Tools
Directional / Gamma
API FL
Chromatograph (ppm)
-
-6460' 6460'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background
(max)
Trip/Circ
Average
69
Mud Type
Lst
- -
Type
-
-
Baker/Hughes VM-3
Spud Mud 4.8
6460'
6460'20
-
Depth In / Out
YP
(lb/100ft2)
10.3
493
00
CementCht Silt
C-4i C-4n
-
24 hr Max
Weight
19
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Running 11 3/4" Casing
PV
0'
14.5 0.994
Footage
- -
2.88
R. Klepzig & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
12
- -
Gas Summary
0
14 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
6460'
6460'
0'
Max @ ft Current
- -
Date:
Time:
Downhole Fluid Gain/Loss (24 hours): -22 bbls while BROOH
observed at the bottoms up from establishing circulation on bottom. Back reamed from 6460’ MD to 5660’ MD at 650 gpm, 100
10
observed. Tripped out of the hole on elevators from 4291’ MD to 2580’ MD, pumping a dry job at 3919’ MD. Tripped out of the hole,
450 gpm, then tripped out of the hole on elevators from 2150’ MD to 567’ MD. Laid down BHA #9 to surface, observing that both
working a tight spot from 2580’ MD to 2522’ MD at 300 gpm, 30 rpm. Worked the sidetrack point between 2150’ MD and 1963’ MD at
in
0 - Minimum
Depth C-5n
-
-
C-2
69
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.545
MBT
-
pH
0.994
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
3
-
1474
0
907-670-6636Unit Phone:
0
David Durst
Maximum
Report By:Logging Engineers:Martin Nnaji / David Durst
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
22
0
Cly
8012
-
Bottoms Up
Time
52 0 517132082 -
Baker/Hughes VM-3 14.52rr2 1-1-NO-A-E-I-NO-TD
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:
Baker/Hughes VM-3 14.52rr2 1-1-NO-A-E-I-NO-TD
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
Bottoms Up
Time
- - -- --
(max)(current)
22
0
Cly
4394
-
Set AtSize
107.0 -
Grade
16.00''
907-670-6636Unit Phone:
0
David Durst
Maximum
Report By:Logging Engineers:Martin Nnaji / David Durst
-
214
0
0
0
Units*
Casing
Summary
Lithology (%)
1
MBT
-
pH
0.994
0
8
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.542
C-5n
-
-
C-2
27
in
0 - Minimum
Depth
Time:
Downhole Fluid Gain/Loss (24 hours): 0 bbls
the hole, tagging up at 2135’ MD. Pulled up to 1999’ MD, then ran in again to 2135’ MD at 30 rpm, 13k ft-lbs torque. Ran in to 2194'
2
6460'
6460'
0'
Max @ ft Current
- -
Date:
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
- -
Gas Summary
0
10 5
(current)
R. Klepzig & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
11
0'
14.5 0.994
Footage
9.96 0'
2.88
-
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Laying Down Shoe Track
PV
-
24 hr Max
Weight
1
Hours
C-3
-
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.9
030
-
-
Baker/Hughes VM-3
Spud Mud 5.0
6460'
6460'16
6460'
Depth In / Out
Mud Type
Lst
- -
Type
Average
270Background
(max)
Trip/Circ
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
-
-6460' 6460'
WOB
H-40
100% Gas In Air=10,000 Units0Connection
-
4
2rr3
Gas: Max Trip : 27 units; Avg Trip : 2 units
heated up the shoe track to break it out.
while working pipe and pumping 10 bbls every 30 minutes. Pumped a dry job and pulled casing from 2094’ MD to surface and
MD. Pulled up to 1999’ MD, then ran in again to 2135’ MD at 30 rpm, 13k ft-lbs torque. Ran in to 2194’ MD, then waited on orders
158'
ConditionBit #
6.89.709.45
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
1-1-BU-A-E-I-NO-TD
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
4-Apr-2016
11:59 PM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
22,000
Ran casing from 730’ MD to 2000’ MD. Continued running casing at 5 fpm from 2000’ MD to 2050’ MD, then ran in
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Rig down Tesco casing running equipment, then picked up GBR to run 2 7/8” tubing. Ran 2 7/8” tubing from surface
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
22,000
0
5-Apr-2016
11:59 PM
Current Pump & Flow Data:
0
Max
1-1-BU-A-E-I-NO-TD
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
ConditionBit #
7.39.809.50
Size
2rr3
Gas: Max Trip : 0 units; Avg Trip : 0 units
MD. Circulated another bottoms up, and performed the third stage cement job. Laid down tubing from 261’ MD to 100’ MD and
from 861’ MD to 561’ MD, then circulated 1 bottoms up. Performed the second stage P&A cement job, and laid down tubing to 261’
at 961’ MD. Laid down tubing from 961’ MD to 861’ MD, then performed the first stage of the P&A cement job. Laid down tubing
158' MD / 158' TVD
100% Gas In Air=10,000 Units0Connection
-
0
Tools
-
API FL
Chromatograph (ppm)
-
-6460' 6460'
WOB
H-40
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background
(max)
Trip/Circ
Average
0
Mud Type
Lst
- -
Type
-
-
Baker/Hughes VM-3
Spud Mud 6.0
6460'
6460'13
6460'
Depth In / Out
YP
(lb/100ft2)
9.5
000
00
CementCht Silt
C-4i C-4n
-
24 hr Max
Weight
0
Hours
C-3
- -
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Blowing Down Cement Lines
PV
0'
14.5 0.994
Footage
9.96 0'
2.88
R. Klepzig & CA Demoski
ShClyst
- -
TuffGvlCoal
cP
10
- -
Gas Summary
0
0 0
(current)
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
6460'
6460'
0'
Max @ ft Current
- -
Date:
Time:
Downhole Fluid Gain/Loss (24 hours): 0 bbls
to 969’ MD. Laid down Sperry tools and 5.5” drill pipe in the mouse hole. Made the cement head and spotted a 50 bbl, 10.7 ppg pill
0
cleaned out the cement stinger with 9.4 ppg LSND, pumping 56 bbls at 168 gpm. Pumped 59 bbls of seawater at 336 gpm and blew
down the cement lines.
in
0 - Minimum
Depth C-5n
-
-
C-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
12.541
MBT
-
pH
0.994
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
0
-
0
0
907-670-6636Unit Phone:
0
David Durst
Maximum
Report By:Logging Engineers:Martin Nnaji / David Durst
Set AtSize
107.0 -
Grade
16.00''
(max)(current)
0
0
Cly
0
-
Bottoms Up
Time
- - -- --
Baker/Hughes VM-3 14.52rr2 1-1-NO-A-E-I-NO-TD
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
.
.
*
24 hr Recap:
Baker/Hughes VM-3 14.52rr2 1-1-NO-A-E-I-NO-TD
Volumes
Hole Capacity
(bbls)
Drillstring
Capacity (bbls)
Annular Volume
(bbls)
Lag Correction
(bbls)
Bottoms Up
Strokes
Bottoms Up
Time
- - -- --
(max)(current)
0
0
Cly
0
-
Set AtSize
107.0 -
Grade
16.00''
907-670-6636Unit Phone:
0
David Durst
Maximum
Report By:Logging Engineers:Martin Nnaji / David Durst
-
0
0
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
-
pH
0.994
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
--
C-5n
-
-
C-2
0
in
0 - Minimum
Depth
Time:
Downhole Fluid Gain/Loss (24 hours): 0 bbls
Rigged down GBR, then rigged down the diverter system. Laid down 5.5” drill pipe to empty the derrick. Disconnect the flow line,
0
6460'
6460'
0'
Max @ ft Current
- -
Date:
Avg
to -
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
- -
Gas Summary
0
0 0
(current)
R. Klepzig & J. Petitjean
ShClyst
- -
TuffGvlCoal
cP
-
0'
14.5 0.994
Footage
9.96 0'
2.88
-
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0903191168
Rigging Down for Rig Move
PV
-
24 hr Max
Weight
0
Hours
C-3
-
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
-
000
-
-
Baker/Hughes VM-3
--
6460'
--
6460'
Depth In / Out
Mud Type
Lst
- -
Type
Average
00Background
(max)
Trip/Circ
- -
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
-
-6460' 6460'
WOB
H-40
100% Gas In Air=10,000 Units0Connection
-
0
2rr3
Gas: Max Trip : 0 units; Avg Trip : 0 units
mud feed and return, and seawater lines. The rig was released from ODSN-20i at 00:00.
158' MD / 158' TVD
ConditionBit #
---
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
-
Nabors 19AC Report For:
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
ODSN-20i
Caelus Energy Alaska
Oooguruk
North Slope Borough
1-1-BU-A-E-I-NO-TD
Conductor
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
6-Apr-2016
11:59 PM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
-
Laid down the last 4 joints of 2 7/8” tubing. Picked up the Johnny Wacker and flushed the riser and diverter stack.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
!
!
!"#!"$!!
%&'(
( )'!*
'(
+,
'(
(
-.
/(
/.(
'
01*(
!"#$%!&#'&(!)*
+
,
(.(-
.
0
'( !"#$%!&#'&(!)*
+
,
1
'(
/
0
0 (
2
(
%&'
03(
(1- +")23 ,
+")
1,
4
5
1 /
3-
1 .333
/
/%
)
*(
)
*(
(
1(
45!/
4 5!
%6'
2
*)(
!
!
(6%6%%!&
(+67%!&+
%!&/1*(!
"8+# &!"7
&8 # 7!7+/
/.
'
789
:* 1
7+9
789
0* 0'
9:; <+<( 7!+ 7!% &"6"
%1(,(
* (
!
01
5
,' '( 1:7+,9
7
9
4 5!
7
9
'
789
45!/
7
9
+1(6+7%!%
(!((!! !"
:
7
9
%
'+
7/.9
+
7
9
< <(
:
3
.
=! 6(! :)->,
/$9;$$ ;2.??99;.3@%23
3 $6&%!% 6+7%!% /$9;$$->)->
/$9;$$ ;2.??99;.3@%23
3 $6 ! (6 +!(" /$9;$$)
0
7
9
;'
789
<
789
45!/
7
9
4 5!
7
9
+,
7
9
+,
7
9
0
1
79
0
79
,'
'
79
)
785=9
+
!" ! ! !" ! !%!& (6%6%%!& (+67%!&+ ! ! 1;9
! !& !++ ! ! !&%!7 (6%6%%!( (+67%!%7 !7 ! :),
! !&( 7! ! ! 7 ! 7&!7 (6%6%%!% (+67%!7 ! ! " :),
"! ! &+!+ "!++ !(& !7&!"+ (6%6%!7( (+67!"7 !+ !7+ :),
! !&" &! !++ !7% !& &!"+ (6%6%!(" (+67!7 !%+ !( :),
(%! ! 7"!7" (!+( !"7 %!%(!"( (6%6%!"% (+67!7 !+( %!%+ :),
%&7! !(7 77!&+ %&"!77 ! (!++%!(7 (6%6%%!+" (+6"+(!( !" (!7( :),
7! %!"& 7%!+ "!"% !7 !7&%+!&% (6%6%&!%( (+6"+!"& ! ! ( :),
& ! &! 7%!(& &%+! & %!& 7!7 7%!& (6%6%"! (+6"7 !"+ !&7 7! :),
(% ! "!(7 7 !++ (%!7& (!& +!%&"(!(& (6%6%+!"" (+6"" !&+ !( "!7% :),
"(! ! 77! "%! !"+ ! (("! (6%6 ! " (+6"&+! !++ ! :),
7+! "!7 7+!+ 7%!% 7!&% ("!("&"!% (6%6&!% (+6"%(!( &!++ (%!(( :),
%&'(
( )'!*
'(
+,
'(
(
-.
/(
/.(
'
01*(
!"#$%!&#'&(!)*
+
,
(.(-
.
0
'( !"#$%!&#'&(!)*
+
,
1
'(
/
0
0
7
9
;'
789
<
789
45!/
7
9
4 5!
7
9
+,
7
9
+,
7
9
0
1
79
0
79
,'
'
79
)
785=9
+
+%! +! ( 77!( +!% 7!% +&! +7 (! (6%6(! (+6"7!% !"( +!%7 :),
6(! +!( 7 !(" +7+!+ %"!% &!"+%%!" (6%6"! (+6("7! 7 ! % 7!&( :),
6&%!% ! + 7%!& 6% !" !& !%+""!7" (6%6"&! (+6((! & !( %%!7( /$9;$$),
6 &!&" %!% 7!% 6+!&( 7!+% "&!(6(%!%( (6%67%! (+6(7!+ !+( ((!(( /$9;$$),
6%7!+ (!7 "+! % 6 !%" &(!" %!7(6 7!" (6%6+!&% (+6&7+!++ %!7 %! & /$9;$$),
6%%!"& +!+ ""!7 67&! ( (!%7 &(!&6+!( (6%6+(!+ (+6& "!%( !% !"& /$9;$$),
6 !& %%!&" " !" 6%(&!+ ("! 7 %&!&"6%7!++ (6%6! (+6 +7!%% !& +!&& /$9;$$),
6&"! %7!&" " !&( 6 %+!+% "!77 %&+!7%6%7%!"% (6%6(!7% (+6 !+ &! % &!&+ /$9;$$),
6(! ! "%! 6&!+" "&!7 7!((6 &&!"" (6%6! (+6%7&!7 !7( %! /$9;$$),
6"%!& !%( "%!" 6&7!( "+! + 7!+6&(!( (6%6 !+% (+6%%!7" !& (%! 7 /$9;$$),
6"+(!&& (!& "! 6( 7!(& 7!7% & &!6&+! ( (6%67!&% (+6&7!77 !( &"!%% /$9;$$),
677+!(+ &!(& "!% 6"!( 7 !"7 ( !+6(& !( (6%6!"" (+67+!+ !&% &+(! /$9;$$),
6+7%!% & !% (7!7 6"("!" 7 !( (7+!&6"!" (6%6!+% (+6 !7( !% ((+!&7 /$9;$$),
6 ! &&!&7 ("!7 6"+!( 7%!(( "! 6"% ! (6%6!7 (+67!&" %!" "!(( /$9;$$)%,
6(+!" &!( "!"% 67"!"& 7%!" "&7!& 6"(!&& (6%6+!" (+6 &! " ! "%7! ( /$9;$$)%,
6(! &%!" "!& 67" !"% 7 !+( 7%!+677!&% (6%6!7% (76+"! %! + 7!"+ /$9;$$)%,
6&&!%( &(!% "!+ 6+7!+ 7"! +7!+67"!++ (6%6 !+ (767+&!"& !+ 77(!& /$9;$$)%,
6% 7! (! ( "!+ 6+"(!"% 77!&( +7"!76+!&% (6%6(!( (767(!7" ! & +(%!+ /$9;$$)%,
6 %7!7 (%!+" (+!" 6+!& 77!(7 6("!&6+(!7& (6%6(!& (76"%(!&" !+ 6 %!%& /$9;$$)%,
6&% !% (&!+" "!7% 6&+! 77!"( 6&%!+ 6%! (6%6(!+ (76(&!% !&" 67!7( /$9;$$)%,
6("!& (+! (7!"( 6+&!( 77! 6 !(6%7!7( (6%6(!+( (76&(%!+ %!+& 6 ! /$9;$$)%,
6"+!+% "!& (+! 6&! 7(!" 6%"!%+6(+! (6%6&!( (76 "(!" %!(7 6%!"" /$9;$$)%,
67!7( "%!7 (7!+7 6&!%% 7&!7 6 (!%6+(!% (6%6 ! (76%7"!"" ! 6%77!++ /$9;$$)%,
6+&!& " ! (&!& 6""!+ 7!+ 6&&!&6!" (6%6!& (76+7!7% %!( 6 ""!( /$9;$$)%,
6+++!++ "! ( !" 6(!" "%!% 6&+ !7+6&!& (6%6%! (76+!" ! 6&("! /$9;$$)%,
%6+%!+ "! (!& 6%"!+ (%! 6(7! 67!++ (6%6%!"& (76!( ! " 6(&&! /$9;$$)%,
%67&! % "%!7 (!"+ 6( !"& &!( 6"(+! +67!&& (6%6+!% (76% ! + %!& 6" %! /$9;$$)%,
%6"7!+ "%! (!( 6+! %(!& 67&"!+76%&! (6%6""!&& ("6+ &!+( !7" 67%%!% /$9;$$)%,
%6%"!& " !% (!& 6%"!(( ! 6+ (!76(! ( (6%6(%!( ("67&"!" !%+ 6+!%7 /$9;$$)%,
%6 ( !"7 "!% (!" 6% &! 7!+ 6%%!" 677!+ (6%6&!" ("6""! %!(% 6!+% /$9;$$)%,
%6&&7!& "%!(" (!%" 6%"%! !+( 6!+"6%"! (6%6%+!( ("6(7!7% !&% 6++!+( /$9;$$)%,
%6(&!+7 "%!( (!7" 6%++!%( &!" 6!6% %!( (6%6"!% ("6&+%!&( !& 67+!% /$9;$$)%,
%6" ! "!"( (! 6 (!7 "!% 6+7! &6%"!7 (6%6&!& ("6&&!7 !" 6"7! /$9;$$)%,
%67%"!% "%! (%!" 6 &%! %7!& 6%7(!+6%+"! (6%6 !(7 ("6 (!"+ !% 6%("! /$9;$$)%,
%6+%!7% "%!( (%!" 6 7!%% 7!"" 6 "&!+&6 !% (6%6++ !"+ ("6%"!" !( 6 &(!7 /$9;$$)%,
6 ! % "! ( !( 6&7! &"!77 6&( !7 6 &! (6%6+7(! ("6%7!"+ !%7 6& (! /$9;$$)%,
6"!(% "%!%% ( !+" 6&%&!7 (&!+" 6(&%! +6 "+!( (6%6+"7!% ("6&! !" 6(% !++ /$9;$$)%,
6!+ " ! 7 (&!+ 6&(!(7 "%!+ 6" !7%6&&! 7 (6%6+"!&& ("6(!"& !&" 6" ! % /$9;$$)%,
6%%!&" "%!7% ((! 6&7(!+" "+!" 67%!"(6&%!"" (6%6+(&!+ ((6+"!7 !7" 67%!7 /$9;$$)%,
6%+(!(" "%!%( (&!" 6(%!" 7&!" 6+!76&&"!" (6%6+&+!(( ((677!"% ! ( 6+!%" /$9;$$)%,
%&'(
( )'!*
'(
+,
'(
(
-.
/(
/.(
'
01*(
!"#$%!&#'&(!)*
+
,
(.(-
.
0
'( !"#$%!&#'&(!)*
+
,
1
'(
/
0
0
7
9
;'
789
<
789
45!/
7
9
4 5!
7
9
+,
7
9
+,
7
9
0
1
79
0
79
,'
'
79
)
785=9
+
6 7+!" "!& ( !7 6( !" +%!& %6+!+6&7&!& (6%6+&! ((6"+ ! !& 6++!7% /$9;$$)%,
6&7!77 "! " (!7 6("!( %!% %6+(!""6(&! (6%6+ %!( ((6"(!"% ! %6"7!+" /$9;$$)%,
6("(! "!" (%! 6"!"% %!( %67 !" 6( !&% (6%6+%!7 ((6(7!"% !++ %6("!& /$9;$$)%,
6"(7!" "!+" (!" 6"7! ( !" %6"! 6("!( (6%6+!&% ((6&%! !% %6&&!7 /$9;$$)%,
67(!&+ "!& (%! 6"&(! %&!+ %6%(!%"6"! (6%6+!+7 ((6 %!% !7( %6% ! /$9;$$)%,
6+&&!" " !% (! 6"7%!+ (!" %6 +!(6"(!7+ (6%6+!7 ((6%& ! ! ( %6 %%!+( /$9;$$)%,
&6 "!+( "&!"% (!%" 67"!7 &+!( %6&%"!+(6"&!77 (6%6777!" ((6(&!%( !(7 %6&%!" /$9;$$)%,
&6 !+ " ! (!7& 67%!+ "!" %6((!""6"" !++ (6%67"&!&% ((6"(!& !" %6(%! " /$9;$$)%,
&6%&!" "%! & (! 67&"! & 7&!" %6"(! 67!& (6%67(%!%& ((67(!7 !77 %6"%!++ /$9;$$)%,
&6%7!+ "%!7 (!%+ 677%!(+ +"! %67 !+(67"! + (6%67&!" (&6++7! ! % %6"+%!%% /$9;$$)%,
&6 ! "%!+ (!% 6++!& +!( %67+%! 67&%!% (6%67 !" (&6++!" !+ %677!&+ /$9;$$)%,
&6& ! % "%!7+ (!+ 6+%&!%( !%% %6+7!67"+!( (6%67"!%" (&67! !" %6+"!& /$9;$$)%,
&6("!% "%!7 (! 6+(! %&! % 6"!&6+&! (6%67 !(% (&6"%!7 !+" 6(!%( /$9;$$)%,
&6"!% " ! ( !7+ 6+7"!7 &!" 6&+!+76+%!7 (6%67 !" (&6( %!( !+ 6&!(% /$9;$$)%,
&6"+ !%( "%!&( (!+" %6%!" &&!" 6 7!76+&"!" (6%6"+&!( (&6&& ! ! 6 !7+ /$9;$$)%,
&677"!+" "%! 7 (!%& %6%+!7 ("! 6%%"!"%6+7%!( (6%6"7%!" (&6 (&! !(( 6%%!( /$9;$$)%,
&6+7! " "%! (%!(" %6((! ( "+!+ 6 (!&7%6!( (6%6""! (&6%"(!%& !%7 6 !& /$9;$$)%,
(6" !&" "%!(" (&!& %6+!7% 7"!7" 6&&! %6%(!(% (6%6"( ! (&67"! " ! & 6&+! /$9;$$)%,
(6("!(( "%! ((! %6+! + !7% 6( ! %6(%! (6%6"&"! (&6+7! & !% 6&+7!& /$9;$$)%,
(6(!"% "%! (&!( %6 &!+( %!( 6(+%!%%67+!"( (6%6"&!+7 (&6+!&& !7 6(7"! /$9;$$)%,
(6%&%!( "%!+ ( !%& %6"!( %+!(% 6"7!&(%6(! (6%6" %!% (&6!+ !+& 6""&!+ /$9;$$)%,
(6 +!(" "!"( (%!+ %6+!% %(!% 67 !" %6%&!7% (6%6"%"!7 ( 6+&7!7 ! 67%+!%( /$9;$$)%,
(6 (! "!"( (%!+ %6%!+7 %! 677%! %6 "!"7 (6%6"%%!& ( 6++!"" ! 67""!7& -A00
.>?=3.>??
!"
# $% $& $
!'()
) *( +
()
,-
()
)
./
0)
0/)
(
12+)!
"#$%& '#(%)(*#+,
-
.
) /)!
/
1
()"#$%& '#(%)(*#+,
-
.
2
()
0
1
1 )
3
)
!'(
14)
)2 -$+34 .
-$+
2.
5 "
! 6
2 0
4
2 /444
0
0!
*
+)
*
+)
)
2)
56 0
56
!7(
3
+*)
#
#
*7' 7''#(
"*-78'#(-
'#(02+)#
$9-%"(#$8
(9 "%"8#8- 0
0/
(
89:
;+ 2
8,:
89:
1+1(
:;< "= -= * 8#- 8 #' ($7$
!2)-)
+)
#
12
6
-( () 2;8,-:
8
:
56
8
:
(
89:
56 0
8
:
,2)"#$
* #**##"#$
;
8
:
!
(,
80/:
,
8
:
"=*= *
;
4
/
> # 7*# ;+ .
!0&:<&!& <3/??::</4@'34
4 & 7('# ' 7$$#8' !0&:<&!& +
1
8
:
<(
89:
=
89:
56 0
8
:
56
8
:
,-
8
:
,-
8
:
1
2
8:
1
8:
-(
(
8:
*
896>:
,
"#$ # # "#$ # # '#( *7' 7''#( "*-78'#(- # # 2<:
# #(" #-- # #" # ('#8 *7' 7''#* "*-78'#'8 #8 #" ;+ .
"# #(* 8#" "# #"8 #"8(#8 *7' 7''#' "*-78'# 8 # #"$ ;+ .
$# # (-#- $ #-- #*( #8 (#$- *7' 7'#8* "*-78#$8 #- #8- ;+ .
# #($ ( # #-- #8' #( "(#$- *7' 7'#*$ "*-78#8 #'- #* ;+ .
*'# # 8$#8$ *#-* #$8 '#' *#$* *7' 7'#$' "*-78#8 #-* '#'- ;+ .
'(8# #*8 88#(- '($#88 #"" *#--' #*8 *7' 7''#-$ "*-7$-*#* #$ *#8* ;+ .
""8# '#$( 8'#- ""$#$' #8 #8('- #(' *7' 7'(#'* "*-7$- #$( # #"* ;+ .
("# (# 8'#*( ('-#"( '#( 8#8"8'#( *7' 7'$# "*-7$8"#$- #(8 8# ;+ .
*'"# $#*8 8"#-- *'#8( *# ( -#'($*#*( *7' 7'-#$$ "*-7$$"#(- #*" $#8' ;+ .
$*# #" 88# $'#"" #$- ""#"**$#" *7' 7""#"$ "*-7$(-#" "#-- "# ;+ .
8 -# $#8 8-#- 8 '#' 8#(' *$#*$($#' *7' 7(#' "*-7$'*#* (#-- *'#** ;+ .
- '# -#"* 88#* -#' 8#' -(#"-8"*# *7' 7*# "*-7$8#' #$* -#'8 ;+ .
!'()
) *( +
()
,-
()
)
./
0)
0/)
(
12+)!
"#$%& '#(%)(*#+,
-
.
) /)!
/
1
()"#$%& '#(%)(*#+,
-
.
2
()
0
1
1
8
:
<(
89:
=
89:
56 0
8
:
56
8
:
,-
8
:
,-
8
:
1
2
8:
1
8:
-(
(
8:
*
896>:
,
7*# -#* 8"#*$ -8-#-" '$# ' (#$-''#$" *7' 7$ # " "*-7*$8#"8 #"' 8#(* ;+ .
7('# ' #"- 8'#( 7'"#$ " # ( " #'-$$#8$ *7' 7$(# "*-7**#"( "#* ''#8* !0&:<&!&+.
7 "(#($ '#' 8# ' 7 -#(* "8#-' $(#* 7*'#'* *7' 78'# " "*-7*8# - #-* **#** !0&:<&!&+.
7'8#- *#8 $-#"' 7"#'$ (*# $ '#8* 7 "8# $ *7' 7-#(' "*-7(8-#-- '#8 '#"( !0&:<&!&+.
7''#$( -#- $$#8 78(#"* *#'8 (*#( 7-#* *7' 7-*#- "*-7("$#'* "#' ""#$( !0&:<&!&+.
7""#( ''#($ $"#$ 7'*(# - *$#"8 '(#($ 7'8#-- *7' 7 # "*-7"-8#'' "# ( -#(( !0&:<&!&+.
7( $# '8#($ $"#(* 7"'-#-' $ #88 '(-#8' 7'8'#$' *7' 7 *#8' "*-7"""#- (#" '"(#(- !0&:<&!&+.
7* # "#" $'# 7( #-$ $(#8 " 8#** 7"((#$$ *7' 7 # "*-7'8(#8 #8* "'#" !0&:<&!&+.
7$'#(" "#'* $'#$ 7(8#* $-#"- "8#- 7(*#* *7' 7 "#-' "*-7''#8$ #( "*'#"8 !0&:<&!&+.
7$-*#(( "*#( $# 7*"8#*( 8#8' ("(# 7(-#"* *7' 7 8#(' "*-7(8#88 "#* ($#'' !0&:<&!&+.
788-#*- (#*( $ #' 7$ #* 8"#$8 * "#- 7*("#* *7' 7 #$$ "*-7 8-#- "#(' (-*# !0&:<&!&+.
7-8'#' ("#' *8#8 7$*$#$ 8"#*" *8-# ( 7$ #$ *7' 7 #-' "*-7 "#8* "#'" **-#(8 !0&:<&!&+.
7$*#8 ($# **#($ 78 -#"* 8 #( $*(#$* 7$*'#* *7' 7 8# ' "*-7'8#" '#$ $"(#8" !0&:<&!&+.
7 *8#$$ *#$ *(#$ 78*$#' $*# * 8""#-- 78 #' *7' 7 '#8 "*87-(-# '#8* 8(# !0&:<&!&+.
7*#$- *(#'' *"#8$ 7--#8$ *-#* -8#"8 78('#*$ *7' 7 *#(' "*878$(#"- "#-$ -8#* !0&:<&!&+.
7'((#" **# ' **# ( 7-"$#-" *#*( 7 #** 78- #$" *7' 7 #* "*87$- #' #(' --#8* !0&:<&!&+.
7""8#( $#( *"#8 7-8#*$ ((#8' 7-8#$ 7-*#"$ *7' 7-'#$- "*87$(# "#" 7$-# !0&:<&!&+.
7("#* $ #$ *"#8 7 '#' "$#* 7 8*#$ 7-($# *7' 78(#(8 "*87* $# #- 7 *$#' !0&:<&!&+.
7*'(#'' $#88 *'#"( 7" #*8 '$#* 7$(#' 7-8(#"8 *7' 7$*#- "*87(8#8( #" 7(*#- !0&:<&!&+.
7$$#8' $# " *"# 7*-#"8 8# 7'*#$"7 '#8 *7' 7*$# ( "*87"" # # 7'""#( !0&:<&!&+.
7$*-# $# " *"# 78# "# * 7" #$7(#- *7' 7*'#'( "*87"# # 7'8'#" A11
/?>4/??
!"#
!$%!$&!$!
"'()
) *(!+
()
,-
()
)
./
0)
0/)
(
12+)
!"#$%&'"($)(*"+,
&-
.
)/)
/
1
()!"#$%&'"($)(*"+,
&-
.
2
()
0
1
1 )
3
)
"'(
14)
)2 &-#+34 .
&-#+
2.
5 !
6
2 0
4
2 /444
0
0"
*
+)
*
+)
)
2)
56!0
5 6!
"7(
3
+*)
"
"
*7'&7''"(
!*-78'"(-
&'"(02+)"
#9-$!("#8
&(9&!$!8"8-&0
0/
(
89:
;+ 2
8,:
89:
1+ 1(
:;<& !=&-=&* &8"-& 8&"' (#7#&&
"2)-)
+ )
&"
12
6
-( () 2;8,-:
8
:
5 6!
8
:
(
89:
56!0
8
:
,2)7'(("!
*&"**""!"#
;
8
:
"
(,
80/:
,
8
:
!=(=&*
;
4
/
>&&" &7*" ;+&.
0%:<% % <3/??::</4@'34
4 %&7('"&' 7'(("! 0%:<% %&+
0%:<% % <3/??::</4@'34
4 %7!#" (78*"'& 0%:<% %+
1
8
:
<(
89:
=
89:
56!0
8
:
5 6!
8
:
,-
8
:
,-
8
:
1
2
8:
1
8:
-(
(
8:
*
896>:
,
!"# " " !"# " "&'"( *7'&7''"( !*-78'"(- " " 2<:
&&" "(! "-- &&" "! "&('"8 *7'&7''"* !*-78'"'8 "8 "! ;+&.
&!" "(* &8"!& &!" "!8 "!8("8 *7'&7''"' !*-78'"&8 "& "!# ;+&.
&#" &"& (-"-& &#&"-- "*( "8&&&("#- *7'&7'"8* !*-78"#8 "-& "8- ;+&.
" &"(# (&"&& &"-- "8' &"(&&!("#- *7'&7'"*# !*-78"8 &"'- &"*& ;+&.
*'" " 8#"8# *"-* "#8 '"'&*"#* *7'&7'"#' !*-78"8 &"-* '"'- ;+&.
'(8" "*8 88"(- '(#"88 "!! *"--'&"*8 *7'&7''"-# !*-7#-*"* "# *"8* ;+&.
!!8" '"#( 8'"- !!#"#' &"8 &&"8('-&"(' *7'&7'("'* !*-7#-&"#( &" &&"!* ;+&.
(!" (" 8'"*( ('-"!( '"( &8"8!8'"( *7'&7'#"& !*-7#8!"#- &"(8 &8"&& ;+&.
*'!" #"*8 8!"-- *'"8( *"&( -"'(#*"*( *7'&7'-"## !*-7##!"(- "*! #"8' ;+&.
#*" &"! 88" #'"!! &"#- !!"!**#"! *7'&7!!"!# !*-7#(-"! !"-- !" ;+&.
8&-" &#"8& 8-"- 8&'"' &8"(' *#"*#(#"' *7'&7("' !*-7#'*"*& ("-- *'"** ;+&.
"'()
) *(!+
()
,-
()
)
./
0)
0/)
(
12+)
!"#$%&'"($)(*"+,
&-
.
)/)
/
1
()!"#$%&'"($)(*"+,
&-
.
2
()
0
1
1
8
:
<(
89:
=
89:
56!0
8
:
5 6!
8
:
,-
8
:
,-
8
:
1
2
8:
1
8:
-(
(
8:
*
896>:
,
-&'" &-"!* 88"* -"' 8"' -("!-8!*"& *7'&7*"&& !*-7#8"' &"#* -"'8 ;+&.
&7*" &-"* 8!"*# -8-"-! '#"&' &("#-''"#! *7'&7#&"&! !*-7*#8"!8 &"!' &&8"(* ;+&.
&7('"&' &"!- 8'"( &7'!"# !&"&( &!&"'-##"8# *7'&7#(" !*-7**"!( !"* &''"8* 0%:<% %+.
&7&!("(# '"' 8"&' &7&&-"(* !8"-' &#("*&&7*'"'* *7'&78'"&! !*-7*8"&- &"-* &**"** 0%:<% %+.
&7'8"- *"8 #-"!' &7!"'# (*"&# &'"8*&7&!8"&# *7'&7-"(' !*-7(8-"-- '"8 '"!( 0%:<% %+.
&7''"#( -"- ##"8 &78("!* *"'8 (*"(&&7-"* *7'&7-*"-& !*-7(!#"'* !"' !!"#( 0%:<% %+.
&7!!"( ''"(# #!"# &7'*("&- *#"!8 '("(#&7'8"-- *7'&7&"& !*-7!-8"'' !"&( -"(( 0%:<% %+.
&7(&#"& '8"(# #!"(* &7!'-"-' #&"88 '(-"8'&7'8'"#' *7'&7&*"8' !*-7!!!"- ("!& '!("(- 0%:<% %+.
&7*&"&& !"! #'"& &7(&&"-# #("8& !&8"**&7!(("## *7'&7&&&"& !*-7'8("8 &"8* !'"! 0%:<% %+.
&7#'"(! !"'* #'"# &7(8"* #-"!- !8"-&7(*"* *7'&7&&!"-' !*-7''"8# "( !*'"!8 0%:<% %+.
&7#-*"(( !*"( #"& &7*!8"*( 8"8' (!("&&&7(-"!* *7'&7&&8"(' !*-7(8"88 !"*& (#"'' 0%:<% %+.
&788-"*- ("*( #&"' &7#&"* 8!"#8 *&!"-&&7*(!"* *7'&7&"## !*-7&8-"- !"(' (-*"&& 0%:<% %+.
&7-8'"'& (!"'& *8"8& &7#*#"# 8!"*! *8-"&(&7#&&"# *7'&7&"-' !*-7&&!"8* !"'! **-"(8 0%:<% %+.
7#*"8 (#" **"(# &78&-"!* 8&"( #*("#*&7#*'"* *7'&7&&8"&' !*-7'8"! '"# #!("8! 0%:<% %+.
7&*8"## *"# *("# &78*#"' #*"&* 8!!"--&78&&"' *7'&7&&'"8 !*87-(-" '"8* 8("& 0%:<% %+.
7*"#- *("'' *!"8# &7--"8# *-"* -8"!8&78('"*# *7'&7&*"(' !*878#("!- !"-# -8"*& 0%:<% %+.
7'(("! **"&' **"&( &7-!#"-! *"*( &7&"**&78-&"#! *7'&7&"* !*87#-&"' &"(' --"8* 0%:<% %+.
7!#" *-"&! *("&& &7-#("&8 (#"* &7#8"*(&7-&8"-8 *7'&7-("!8 !*87#("- !"!& &7(8"8- 0%:<% %+'.
7!8*"8 *#"* *#"'( &7--#"& ('"-- &7&''"'8&7-!"- *7'&7-"- !*87*#"(( !"#( &7&&'"(* 0%:<% %+'.
7(!*"* *8"*# *("!! 7&-"# ("!8 &7&8-"(&7-*'"( *7'&788"8 !*87*&!"8# '"#* &7&*-"&( 0%:<% %+'.
7*'-" #"-* *!"' 7(&"# !"#& &7#("#!&7--("( *7'&78&"'8 !*87(8"&* "# &7(*"( 0%:<% %+'.
7#'" #"** *"'# 78"#! '"!* &7'*'"(7!"(! *7'&7#&"!- !*87!!"'* "# &7'!!"'8 0%:<% %+'.
78&#"- #!"* *"(& 7&!"# "' &7!!!"&7!8"( *7'&7(-"*# !*87'(-"* '"& &7!("-- 0%:<% %+'.
7--"#8 #!"'8 *&"&! 7&-"!# *"* &7('"'-7#'"# *7'&7!("#8 !*87#&"'- "# &7(&("' 0%:<% %+'.
'7'"8 #&"-# *"( 7&(*"(' #" &7*"-7&"'' *7'&7''"* !*87&8"8 "#! &7*!"#- 0%:<% %+'.
'7&'"(( #!"'& *&"8* 7&8("*& "!( &7#&("-7&-"!& *7'&7" !*878#"## "'! &7#"#! 0%:<% %+'.
'7&-#" #"88 *"8 7&"& '"-8 &78!"*-7&(("8& *7'&7#"8* !*#7--8"-* &"(( &7#-"'- 0%:<% %+'.
'7-"'- #'"(8 *'"*( 7'8"-( !!"8 &78-'"!&7&8"#( *7'7--#"&& !*#7-&" &"#8 &78#-"#8 0%:<% %+'.
'7'8'"' #"( *'"'* 7**"' (!"& &7-8&"*!7-"8' *7'7-8#"!' !*#78&"-! &" &7-*8"(! 0%:<% %+'.
'7!#*"*& #&"# *'"( 7-!"# *!"!8 7*-"-7'8"( *7'7-##"!' !*#7#''"*( "8! 7(#"'* 0%:<% %+'.
'7(*-"* #"'& *"!! 7''"!! #("( 7&(#"*87*#"! *7'7-**"## !*#7*!("8! &"! 7&!("8& 0%:<% %+'.
'7**"88 #&"( *"8! 7'("'- 8*"8* 7!("*7-*"&- *7'7-(("## !*#7((#"88 "-! 7'!"!( 0%:<% %+'.
'7#(("8' #&"-# *'"& 7'8&"( -#"*( 7'''"&7'("' *7'7-!("'! !*#7!#"! "(* 7'"# 0%:<% %+'.
'78!8"8* #'"& *"- 7!-"'! &-"8 7!&"'7'('"&! *7'7-'!"# !*#7'8"&# &"# 7!&&"!( 0%:<% %+'.
'7-!"#* #'"!' *&"- 7!'*"- &&"(- 7(&"'&7'8"- *7'7-"& !*#7-'"* "- 7(&"! 0%:<% %+'.
!7'("(' #'"(8 *"# 7!*"*' &''"8 7(-8"!&7!*"!' *7'7-&"( !*#7!"-& "! 7(-"'( 0%:<% %+'.
!7&#"- #'"&! *'"&' 7!8-"- &!("# 7*8*"7!'"8- *7'78--"'* !*#7&&#"# &"& 7*#8"8( 0%:<% %+'.
!7"& #"# *'"*- 7(&#"! &(("'- 7##("!-7!*&"! *7'788-"!& !*#7#"#* &"# 7#*8"*8 0%:<% %+'.
!7'&("&- #'"# *'"(* 7(!("&' &*("( 78*'"#*7!88"-' *7'78#-"- !**7-'-"!# &"8 78(#"!! 0%:<% %+'.
!7!8"*( #"*8 *'"8 7(#"*( &#("* 7-("('7(&*"!( *7'78#"!( !**78("** "!- 7-!*"# 0%:<% %+'.
"'()
) *(!+
()
,-
()
)
./
0)
0/)
(
12+)
!"#$%&'"($)(*"+,
&-
.
)/)
/
1
()!"#$%&'"($)(*"+,
&-
.
2
()
0
1
1
8
:
<(
89:
=
89:
56!0
8
:
5 6!
8
:
,-
8
:
,-
8
:
1
2
8:
1
8:
-(
(
8:
*
896>:
,
!7(&"-' #'"!* *'"-# 7(--"8& &8!"(( '7!&"*7(!'"*& *7'78*&"' !**7#*&"- "8( '7'("8# 0%:<% %+'.
!7(-!"- #!"' *!"*- 7*("*- &-'"'8 '7&'"&!7(*-"!- *7'78("8* !**7*#'" &"&& '7&("- 0%:<% %+'.
!7*8#"-' #!"&8 *("(# 7*(&" "-8 '7&-"'7(-!"8 *7'78!("* !**7(8'"8 "-& '7&!"! 0%:<% %+'.
!7#8"# #!"!! *'"8& 7*#*"!* -"'* '7'-"(*7*"* *7'78'#"* !**7!-'"(! &"8 '7'!"-' 0%:<% %+'.
!78#("( #'"' *'" 7#"'' &-"*! '7'-8"!87*!*"&' *7'78#"*- !**7!!"(8 &"!* '7'-!"! 0%:<% %+'.
!7-*8"! #&"-* *"# 7#'"8 '" '7!8*"''7*#'"88 *7'78&("!8 !**7'&*"*- "#* '7!8'"&! 0%:<% %+'.
(7*"# #"#8 *&"!( 7#(8"- !("8* '7(#'"'87#&"8- *7'78"&- !**7-"(- &"&* '7(#&"( 0%:<% %+'.
(7&('"- #&"*- *"-! 7#8*"( (-"!! '7**&"-7#'"' *7'7#88"-* !**7&!&"8! &"8 '7**" 0%:<% %+'.
(7!#"(8 #"-! *&"(' 78&!"-8 #'"! '7#!-"'7#(8"#8 *7'7##("# !**7('"(8 &"!* '7#!-"( 0%:<% %+'.
(7'!"!& #&"8' *&"&' 78!'"# 8*"'# '78'*"#*7#8*"8# *7'7#*"#! !*(7-**"# &"* '78'#"#' 0%:<% %+'.
(7!''"-- #"#( *&"-# 78#&"(! --"!# '7-!"-!78&("'! *7'7#(" !*(78##"8( &"' '7-*"8# 0%:<% %+'.
(7(*"#' #'"* *"!' 78-8"'# '&&"( !7&"8-78!"&# *7'7#'8"'& !*(7#8-"8* &"( !7&("*! 0%:<% %+'.
(7*"(& #"( *"! 7-("*- ''"'* !7&&"878*-"!- *7'7#*"8' !*(7#"- &"&- !7&("'! 0%:<% %+'.
(7#&'"!8 #"-& *"&' 7-('"'' ''("'& !7&8-"#878-#"&' *7'7#&("( !*(7*&"- "( !7&-!"& 0%:<% %+'.
(78*"'& #&"*- *'"# 7-8&"(( '!*"# !7##"!#7-("'( *7'7#!"& !*(7(("&# &"*' !78"( 0%:<% %+'.
(7-!" #&"*- *'"# '7!"&8 '*"! !7!("'(7-*#"-8 *7'7*8-"&- !*(7'-#"! " !7!&&"'& A11
/?>4/??