Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-041XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. ~.6.,(.~" - 0t~ ~. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Beverly ~incent Nathan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is/ STATE OF ALASKA I^~ ~~s~~ V ALASKA OIL AND GAS CONSERVATION CONSIGN WELL COMPLETION OR RECOMPLETION REPORT AND LOt~~V ~ 1 207 At~ska Oil & Gas Cons. Commission 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended ~: zoAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Well ~$Qa ~ ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 9/20/2007 ,p~' 12. Permit to Drill Number 195-041 - 307-177 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 04/11/1995 13. API Number 50-029-22550-00-00 ' 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 05/07/1995 14. Well Name and Number: PBU X-30 - 4722 FSL, 876 FEL, SEC. 07, T10N, R14E, UM Top of Productive Horizon: 2175' FNL, 199' FEL, SEC. 18, T10N, R14E, UM 8. KB (ft above MSL): 70.1' ~ Ground (ft MSL): 39.1' 15. Field /Pool(s): , Prudhoe Bay Field / Prudhoe Bay Total Depth: 3300' FNL, 275' FEL, SEC. 18, T10N, R14E, UM 9. Plug Back Depth (MD+TVD) 12955 904$ Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 665022 y- 5939553 Zone- ASP4 10. Total Depth (MD+TVD) 13043 - 9055 - 16. Property Designation: ADL 047475 _ TPI: x- 665875 y- 5932673 Zone- ASP4 Total Depth: x- 665827 y- 5931546 Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: 18. Directional Survey ^ Yes ®No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD, GR, RES, GYRO, DIL, Sonic, NEU, DEN, BHC 22. CASING, LINER AND CEMENTING RECORD CASING SETTING' DEPTH-MD SETTING DEPTHr7VD HOLE AMOUNT WT. PER FT. GRADE 'TOP BOTTOM TOP .BOTTOM` SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 31' 111' 31' 111' 30" 26 sx Arctic Set A r x. 10-3/4" 45.5# NT80 30' 3277' 30' 3083' 13-1/2" 965 sx CS III, 375 sx'G', 140 sx CS II 7-5/8" 29.7# L-80 27' 11628' 27' 924' 9-7/8" 265 sx Class 'G' 5-1/2" 17# L-80 11482' 13043' 88 0' 055' 6-3/4" 18 sx Class'G' 23. Open to production or inject ion? ^ Yes ®No 24. TUBING RECORD If Yes, list each interval open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 4-1 /2", 12.6#, 13Cr80 / L-80 11485' 11307' & 11438' MD TVD MD TVD Z5: ' ACID, FRACTURE, CEMENT SQUEEZE, ETC. ~~~ fV~~ ~ ~ ~~~~ DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 12880' Set Whipstock 26. PRODUCTION TEST _..,. Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUTS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: CALCULATED 24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Cores Ac uired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 None Form 10-407 Rewsed 02/2007 CONTINUED ON REVERSE SIDE ~~ / ~ ~ ~ ~ V ~ ~ • h (,,,. ~ ~C •28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN ERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 11601' 8910' None Shublik 11627' 8923' Sadlerochit /Zone 4A 11772' 8980' Sadlerochit /Zone 4 11909' 9005' Formation at Total Depth (Name): 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 31. I hereby certify that the fore ing is true and correct to the best of my knowledge. ~ , O Si ned / ~~/d 9 Terrie Hubble Title Drilling Technologist Date PBU X-30 195-041 307-177 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / A royal NO. Drilling Engineer: Greg Sarber, 564-4330 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Digital Well File S ~ Page 1 of 1 Well: X-30 Well History Well Date Summary X-30 8/1/2007 ***WELL SHUT IN ON ARRIVAL*** MIRU SLICK LINE DC#8 TO PULL TT PLUG. ***CONT ON 08-02-2007*** X-30 8/2/2007 ***JOB CONT.FROM 8/1/07*** (pre ctd) TAGGED TOP OF XXN PLUG AT 11,475' SLM W/ 3.80" GAUGE RING. EQUALIZED 4-1 /2" XXN PLUG & PULLED FROM 11473' MD. CALIPERED TUBING FROM 11550' SLM TO SURFACE. GOOD DATA. ***TURN WELL OVER TO DSO*** X-30 8/4/2007 **** WELL SHUTIN ON ARRIVAL **** JOB CANCELLED -WELL HEAD UNTOUCHED **** WELL LEFT SHUTIN WITH DSO **** X-30 8/6/2007 CTU #8, Mill 3.725" XN Nipple to 3.80"; MIRU unit. MU and RIH with BKR "left-handed" motor and 3.80" OD diamond speed mill. Tag XN nipple at 11461' ctmd. Mill through XN and continue past end of tubing fait down to 11535' ctmd. PUH and dress off XN. Drift cleanly through XN without rotating. POOH. *** Job Complete *** X-30 8/7/2007 ***FASDRIL, CHEM CUT*** WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O: 225/160/220. j~IH TO SET HES FAS DRILL BRIDGE PLUG IN TUBING TAIL AT 11468' ***CONTINUED ON 8-AUG-2007*** ****JOB IN PROGRESS**** X-30 8/8/2007 T/I/0=0/140/200 (Assist E-Line with CMIT-TxIA PASSED to 3500 psi, MIT-OA PASSED to 2000 psi) (Pre CTD) CMIT-TxIA to 3500 psi. (TxIA Comm) Pumped 14 bbls of crude. CMIT-TxIA lost 80/60!0 psi In the 1st 15min and 20/0/0 psi in the 2nd 15 min for a total of 100/60/0 psi. Bleed TxIA down. MIT OA to 2000 psi. ***PASS*** Pumped 1.3 bbls of crude. MIT-OA lost 120 psi In the 1st 15min and 30 psi in the 2nd 15 min for a total of 150 psi. Bled OAP down ***Continued on 8-9-07*** X-30 8/8/2007 ***CONTINUED FROM 7-AUG-2007*** WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O: 225/160/220 SET HES FAS DRILL BRIDGE PLUG IN TUBING TAIL AT 11468' TOOL STRING LENGTH = 24.5', MAX OD = 3.66". WEIGHT = 275 LBS. SET 4.5" FAS DRILL PLUG MID ELEMENT AT 11468'. TOTAL LENGTH = 28.92" TOP OF PLUG TO MID-ELEMENT = 14". MID-ELEMENT TO BOTTOM OF PLUG = 15" j3RS PRESSURED UP TO 3500 PSI. PLUG FAILED. PE INSTRUCTED TO SET ANOTHER FASDRIL PLUG. SET 2ND 4.5" FAS DRILL PLUG MID ELEMENT AT 11432'. TOTAL LENGTH = 28.92" RIH WITH TUBING PUNCH GUN WITH 2' LOADED J F = 9 HOLES RUNNING CORRELATION PASSES JOB CONTINUED ON 8/9/07 AWGRS REPORT ****JOB IN PROGRESS**** X-30 8/9/2007 ***Continued from 8-8-07*** Equalized TxIA with 1" jumper line FWHP's= 60/40/0 ----Hung tags on on OA, IA, & Wing vlv. Verified that casing valy on OA & IA open to gauges. X-30 8/9/2007 ***CONTINUED FROM 7-AUG-2007 *** TBG PUNCH FROM 11370-11372 FT WITH 1.56" 2FT 4SPF 0 DEG PHASING 20J UJ HMX. LRS U-TUBED. STRING SHOT FROM 11386-11397 WI 1' x 2 STRAND. BIN AT 11396' WITH 3.5" CHEMICAL CUTTER. CUTTER HEAD LOOKS GOOD 2" AROUND CUT HOLES ARE C N ~~ED, 3 CENTRALIZERS RUN TH ~57$'rAN FINAL T/I/O = 0/0/200. WELL SHUT IN. ***JOB COMPLETE*** X-30 8/16/2007 T/I/0=100/150/160 Circ-Out {CTD + Rig Prep) Pumped 5 bbls methanol spear, 737 bbls 2% KCL down tbg taking returns up IA to FL Pumped 83 bbl Freeze Protect down TBG continued on 8-17-07 X-30 8/17/2007 Continued from 8-16-07 Circ-Out - U-Tube freeze protect from Tbg to IA for 1 hr. Pumped 3 bbls meth, 10 bbls 100*F Diesel down F.L. fo FP. Bleed down WHP. FWHP=O/0/0 X-30 9/4/2007 set 4" ciw bpv for nordic 2 Print Date: 10/31/2007 Page 1 of 1 http://digitalwellfile.bpweb.bp.com/WIInfo/Reports/ReportViewer.aspx 10/31/2007 i BP EXPLORATION Page 1 of 25 Operations Summary Report Legal Well Name: X-30 Common Well Name: X-30 Spud Date: 4/11/1995 Event Name: REENTER+COMPLETE Start: 8/7/2007 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date I From - To ~ Hours I Task I Code I NPT I Phase ( Description of Operations 9/9/2007 00:00 - 06:00 6.00 MOB P PRE 06:00 - 07:00 1.00 MOB P PRE 07:00 - 07:30 0.50 MOB P PRE 07:30 - 09:00 1.50 MOB P PRE 09:00 - 13:30 4.50 MOB P PRE 13:30 - 14:00 0.50 MOB P PRE 14:00 - 18:00 4.00 MOB P PRE 18:00 - 21:00 I 3.001 MOB I P I I PRE 21:00 - 21:30 0.50 MOB P PRE 21:30 - 00:00 2.50 MOB P PRE 9/10/2007 00:00 - 02:00 2.00 MOB P PRE 02:00 - 02:30 0.50 MOB P PRE 02:30 - 06:00 3.50 MOB P PRE 06:00 - 09:30 3.50 MOB P PRE 09:30 - 10:15 0.75 MOB P PRE 10:15 - 13:30 3.25 MOB P PRE 13:30 - 14:15 0.75 MOB P PRE 14:15 - 18:00 3.75 MOB P PRE 18:00 - 18:30 0.50 MOB P PRE 18:30 - 21:00 2.50 MOB P PRE 21:00 - 21:30 0.50 MOB P PRE 21:30 - 00:00 2.50 MOB P PRE 9/11/2007 00:00 - 02:30 2.50 MOB P PRE 02:30 - 03:00 0.50 MOB P PRE 03:30 - 05:30 I 2.00 MOB ! P I !PRE 05:30 - 06:00 0.50 MOB P PRE 06:00 - 06:30 0.50 MOB P PRE 06:30 - 09:15 2.75 MOB P PRE 09:15 - 12:00 I 2.751 MOB I P I PRE 12:00 - 15:00 3.00 MOB P PRE 15:00 - 17:20 1 2.33160PSURP I I PRE Wait on completion of PS1 lift. Called security to assist in rig move. Crew change conduct walkabout to look at location and make ready to mob Safety Meeting with Crew and Security Traveled Pad 90 to Oxbow Travel from Oxbow turnoff to XPad Lease road Travel on mats from Spine Road to X-Pad Traveled down X Pad road on Mats. Stacking rig mats 2 high prior to moving rig back. Rig on standby. Change out with day crew 7 PJSM. wait for loader to shuffle rig mats. Backup rig on 2 tier of rig mats. Lay rig mats out in single file. - 1/3 way down access road. Rig on standby. Continue to lay rig mats out in single file. Rig on standby. Travel down X Pad access road on rig mats. Stacking rig mats 2 high prior to moving rig back. Rig on standby. at 07:00 hrs, 1/2 way down access road Crew change, moved rig back 200 yards. Moving rig mats Travel down X Pad access road on rig mats Stacking rig mats prior to moving rig back. Travel down X Pad access road on rig mats Stacking rig mats prior to moving rig. Crew change out &PJSM. Stacking rig mats prior to moving rig. Travel down X Pad access road on rig mats. Stacking rig mats prior to moving rig. Continue to stack rig mats prior to moving rig. Move rig onto front side of X pad. Park rig while loaders move rig mats over access road to rear of pad. Move rig to backside of pad. Place rig mats in front of well. Get work permit signed. Remove work platform from around well head. Place dunnage under front side of BOP skid. Move & spot rig on rig mats in preparation to back over well. Wait for DSO to make change out before spotting rig over well. Crew change out &PJSM. Held PJSM, lined rig up and moved rig over well and set down. Leveled rig. Installed cutting box, and DSM rigged up tiger tank. PJSM and ulled BPV with lubricator Rig accepted at 07:00 hrs 9/11/2007 RURT Filled pits with 500 bbl of 2% KCL Spotted Office camp and 40 mancamp RU to circulate well to Tiger tank PT surface lines to 3000 psi check integrity (OK) Circulate down IA and recover 40 bbl of diesel to tiger tank Circulated 40 bbl down IA and recovered 40 bbl of diesel and circulated it to tiger tank. Checked fluid (SW), Switch to pumping down tubing. Op = 3 bpm 200 psi. Took 200 bbl to tiger tank before bring back into pits. Circulated 300 bbl with 1 drum of SafeSurfO. SD pump and check flow OK Printed: 10/23/2007 3:00:05 PM • • BP EXPLORATION Page 2 of 25 ~ Operations Summary Report Legal Well Name: X-30 Common Well Name: X-30 Spud Date: 4/11/1995 Event Name: REENTER+COMPLETE Start: 8/7/2007 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date I From - To I Hours ( Task 9/11/2007 17:20 - 19:00 1.67 BOPSL 19:00 - 20:00 1.00 BOPSI. 20:00 - 23:30 3.50 BOPSI. 9/12/2007 00:00 - 06:00 6.00 BOPSI 06:00 - 06:30 0.50 BOPSI 06:30 - 13:00 6.50 BOPSI 13:00 - 18:00 18:00 - 19:30 19:30 - 23:00 23:00 - 00:00 9/13/2007 00:00 - 01:30 01:30 - 06:00 06:00 - 07:00 07:00 - 08:00 08:30 - 09:00 09:00 - 18:00 18:00 - 20:00 20:00 - 20:30 20:30 - 20:45 20:45 - 22:00 22:00 - 00:00 9/14/2007 00:00 - 02:15 02:15 - 03:00 03:00 - 04:15 Code ~ NPT I Phase i Description of Operations P WHDTRE RU to dry rod in TWC. Open well and well is u-tubing. Resume circulation to balance well. P WHDTRE Hold PJSM with crew to discuss plan. .Install TWC in tubing hanger. Pressure test from below to 500 psi. P WHDTRE Hold PJSM with crew & FMC. Secure lines. ND tree and remove from cellar. P WHDTRE Continue to NU 13-5/8" BOP stack P WHDTRE Crew change, PJSM and discussed plan forward P WHDTRE RU to conduct shell test on BOP. Replacing orings on SLB ubricator with shooting flange and replaced the seal in graylock connections. Working on getting a shell test, grayloc fitting leaking. AOGCC witnessing BOP test 5.00 BOPSU P WHDTRE BOP test and repairing grayloc fitting in cellar on choke line need fix the clamps, trouble with choke valve 3 & 4. Finally tested CM4 and wheras CM3 need rebuilt. Finished BOP test. 1.50 BOPSU P WHDTRE Crew change. Hold PJSM with crews. PU DSM lubricator to rig floor. MU and pressure test same. Engage and pull two way check from tubing hanger profile. Remove lubricator from rig. 3.50 BOPSU P WHDTRE Hold PJSM. ND shooting flange from on top of annular. NU flow riser. Fill with KCL and check for leaks. 1.00 PULL P DECOMP Rig up floor to pull completion. Bring Halliburton spooler and spools on to floor and spot same. 1.50 PULL P DECOMP Continue to rig up to pull tubing. Tubing up weight: 151 k# with no "extra overpull. Monitor well for flow. Pull hanger to floor. Break out hanger and landing joint. Secure two control lines to spooler. 4.50 PULL P DECOMP Pull and LD 52 jts 4-1/2" IBT tubing and jewelry. 1.00 PULL P DECOMP Crew change, PJSM and disscussed the hazards of pulling completion Conducted walkabouts 1.00 PULL P DECOMP Unload Pipe shed, LD 10 jts 0.50 PULL P DECOMP Held PJSM on crane lifting spool off of the rig. Lifted HES spool off of the rig 9.00 PULL P DECOMP Pulling 4-1/2" completions Filling hole ever 10 jts. Unloading pipe shed every 40 jts layed down. LD a total of 253 jts 2.00 PULL P DECOMP Continue to LD 4-1/2" completion equipment. Inspect chemical cut. Max OD is 4.75" due to a lip on one side of cut. Overshot should go with a little push. Length of cut section recovered is 20.31'. 0.50 PULL P DECOMP Rig down handling equipment on the rig floor. Clean up floor. 0.25 EVAL P RUNCMP Hold PJSM with SLB and Nordic. Review job steps, hazards, safe areas, rig up & rig down procedures. 1.25 EVAL P RUNCMP Spot and rig up SLB slickline unit. Bring tools and equipment to rig floor. 2.00 EVAL P RUNCMP Run 6.65" OD GR/JB run. Tag at 11,400' SL depth. POOH. Run 6.0" LIB. Tag stub at 11,400'. POOH. Nice circulare tmpresston w s fight flaring on one side. Looks Pike twin to cut joint recovered. 2.25 EVAL P RUNCMP Continue with slickline runs. Run 3.8" saved a to drift tubin stub. Ta at 11438'. POOH. 0.75 EVAL P RUNCMP Hold PJSM. Rig down SLB slickline equipment. 1.25 WHSUR P RUNCMP Load 45 jts 3-1/2" 15.5# drill pipe into pipe shed. Strap same. Printed: 10/23/2007 3:00:05 PM BP EXPLORATION Operations Summary Report Page 3 of 25 Legal Weil Name: X-30 Common Well Name: X-30 Spud Date: 4/11/1995 Event Name: REENTER+COMPLETE Start: 8/7/2007 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date I From - To ~ Hours E Task I Code I NPT I Phase ~ Description of Operations 9/14/2007 04:15 - 06:00 06:00 - 08:30 1.75 2.50 WHSUR WHSUR P P RUNCMP RUNCMP Make up bit sub and 42 jts of 3-1/2"drill pipe. PU RTTTS and SS Control Vallve and set RTTTS at 70 ft. POOH and stood back DP in the derrick.PT the pascker and 2" air lin ruptures. Ref traction RPT # 2007-IR-2406859. Close 2" valve and PT the packer to 2000 psi 08:30 - 09:30 1.00 WHSUR P RUNCMP Held a PJSM and discussed the incidient that occurred while trying to PT the packer. Root cause is the equipment failured occured because the 2" HP valve was not shut and cap to isolated this LP air line that is used for blowing down the surface lines. The pressure s test was conductred but the PT was not discussed in detail. Held PJSM dealing with packoff work. 09:30 - 12:30 3.00 WHSUR P RUNCMP Pulled out old packoff, landed new FMC oackoff and RILDS. Test packoff to 5000 psi 15min OK 12:30 - 13:00 0.50 WHSUR P RUNCMP PJSM on pulling RTTS and laying down DP 13:00 - 15:15 2.25 WHSUR P RUNCMP RIH and screwed into SSCV and upset RTTS. PU and lav . d 42 jts 3-1 /2" drill pipe 15:15 - 15:30 0.25 WHSUR P RUNCMP PJSM on unlaoding pipe shed and loading tubulars for completion 15:30 - 16:00 0.50 RUNCO RUNCMP Unload 3-1/2" dp from pipe shed. 16:00 - 18:00 2.00 RUNCO RUNCMP Loading and prep 4-1/2" tubing 18:00 - 00:00 6.00 RUNCO RUNCMP Continue to load and prep tubing in pipe shed. 9/15/2007 00:00 - 03:30 3.50 RUNCO RUNCMP Continue to load, drift, and strap 4-1/2" tubing in pipe shed. 03:30 - 04:00 0.50 RUNCO RUNCMP Hold PJSM with crews and service hands. Rig up floor to run pipe. 04:00 - 06:00 2.00 RUNCO RUNCMP MU tail pipe assembly w/ X nipple, overshot, packer, and X nipple assembly. Baker lock components. 06:00 - 18:00 12.00 RUNCO RUNCMP RIH with 4-1 /2" completion using Doyon Torque Turn Average 22 jts per hours. 180 jts in at 18:00 hrs 18:00 - 00:00 6.00 RUNCO RUNCMP Continue to run 4-1/2" completion. 9/16/2007 00:00 - 00:30 0.50 RUNCO RUNCMP Continue to run in hole with 4-1 /2" completion. 00:30 - 02:45 2.25 RUNCO RUNCMP 124k# up, 86k# do wt with 266 jts in hole. See very good indication of shear screws shearing. Tag 3.9' deeper. Tag up 11.7' in on jt # 268. LD extra pipe. MU 18' of space out pups one full jt below hanger. MU tubing hanger. Drain BOP stack. Land completion. Ran a total of 266 jts 4-1 /2" 12.6# 13Cr VAM TOP tbg. Spaced out 4' above btm out in overshot. 02:45 - 03:15 0.50 RUNCO RUNCMP Rig down floor after running completion. 03:15 - 03:30 0.25 RUNCO RUNCMP Hold PJSM with crew and SLB slickliners. Review job, hazards, lifting equipment, safe area and more. 03:30 - 04:00 0.50 RUNCO RUNCMP Spot slickline unit. Bring tools and equipment to floor. 04:00 - 15:15 11.25 RUNCO RUNCMP Run in hole to retrieve RHC plug set in X nipple at 11,330'. RIH with~~3.8" OD ^TS and tagged at 11402 ft. Worked down to 11,436 ft WLMD, PU was clean. Acted like there was something in front of the TS. POOH, PU and RIH with 17' 3.7" OD Dummy WS. Tagged the PBTD at 11,438 ft. POOH to reset RHC plug RIH and reset RHC plus at 11,331 ft. POOH. Held PJSM and RD wireline. Good Job 15:15 - 15:30 0.25 RUNCO RUNCMP PJSM on circulating wellbore 15:30 - 15:45 0.25 RUNCO RUNCMP RU to reverse circulate wellbore 15:45 - 17:35 1.83 RUNCO RUNCMP Reverse circulating 2% KCL with corrosion inhibitor down IA Printed: 10/23/2007 3:00:05 PM • • BP EXPLORATION Legal Well Name: X-30 Operations Summary Report Page 4 of 25 j Common Well Name: X-30 Spud Date: 4/11/1995 Event Name: REENTER+COMPLETE Start: 8/712007 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date I From - Ta ~ Hours ~ Task ~ Code I NPT I Phase Description of Operations 9/16/2007 15:45 - 17:35 17:35 -18:00 18:00 -18:30 18:30 - 22:45 1.83 0.42 0.50 4.25 RUNCO RUNCO RUNCO RUNCO RUNCMP RUNCMP RUNCMP RUNCMP Op = 2.90 / 2.99 bpm Pp = 215 psi Trips set at 500 psi Dropped ball and rod and wait 30 minutes to allow to fall Crew change. Make rounds on rig. Hold PJSM to discuss testing procedure. Line up to set packer. Pressure tb4 to 4000 asi. Holding _ stead for 10 minutes. 2" high pressure hose fitting on floor started leaking. Bleed tbg. Repair leaking fitting. Test tubing to 4000 psi for 30 minutes. Bled down to 3925 psi._ Bleed tbg to 1500 psi. Pressure test tb x cs ann to 3500 psi. Sall fitting leak in cellar. Bleed pressure to repair same. est IA to 5 0 psi or 30 minutes. Minimal bleed off. Bleed tbg and shear DCK valve. Circ to verify shear. 22:45 - 00:00 1.25 RUNCO RUNCMP Hold PJSM with Little Red. Dicsuss job steps, hazards, safe area and more. SPot unit. Rig up hose and pressure test same to 4000 psi. Pump 65 bbls diesel down the IA taking returns up the tubing. 9/17!2007 00:00 - 00:15 0.25 RUNCO RUNCMP Rig down Little Red. 00:15 - 01:30 1.25 RUNCO RUNCMP Rig down floor. Back out landing joint. Drain BOP stack. 01:30 - 02:15 0.75 BOPSU P WHDTRE Set two way check with FMC. Test from below to 500 psi. 200 psi remaining on IA due to dieseUkcl balance. 02:15 - 06:00 3.75 BOPSU P WHDTRE Hold PJSM with crew to discuss removing riser and 13-5/8" BOPs. Pull upper riser through floor. ND lower riser. ND kill & choke lines. ND BOPs. Set on skid. 06:00 - 11:30 5.50 BOPSU P WHDTRE RU to install 13-5/8" X 4-1/2" tree adaptor Make up landing jt to TIW valve with TCII threads. Crane in the Farr tongs and crane out the 4-1/2" thread protectors. PT adaptor to 5000 psi 10 min OK, NU tree and PT same to 5000 psi 11:30 - 17:45 6.25 BOPSU P WHDTRE Suck diesel out of tree and nipple down tree and adaptor. Changed out SBMS (Straight Bowl Metal Seal) and stabbed tree back on wellhead to retest. PT the adaptor and then PT the tree.Test results the same on the tree. Ordered new adaptor and SBMS seal Removed tree and adaptor Installed new adaptor with SBMS. PTadaptor to 5000 psi and tree to 5000 psi. Good test. The poor manufacturing QAOC on the adaptor flange was the reason the tree would not PT. Sent old adaptor flange to FMC Anchorge. 17:45 - 18:30 0.75 RIGD P WHDTRE Crew change and make ready to back off of well. 18:30 - 00:00 5.50 RIGD P WHDTRE Back off well. MU lower double gate to upper BOPs. Spot in cellar. MU kill and choke valves #o mud cross. 9/18/2007 00:00 - 01:30 1.50 RIGU P WHDTRE Lift BOPs. Move rig back over well. Re-spot equipment all equipment. 01:30 - 01:45 0.25 RIGU P WHDTRE Hold PJSM to dicuss nipple up work in cellar. 01:45 - 05:30 3.75 RIGU P WHDTRE Continue to NU BOPs to tree. NU choke and kill lines. SIMOPS: Hotd PJSM with Veco & SLB. Lift reel from trailer and install in reel house/stand. RU hard line in side reel. Continue to NU BOPs. 05:30 -10:30 5.00 RIGU P WHDTRE Service valves and make ready to conduct shell test on 7-1/16" BOP Installed shorter studs on 7" Otis cross-over. Filled stack. PT BOP. Bob Noble w/ AOGCC wavered wittnessing the BOP. Choke manifold will not test. Installed 2-3/8" test joint and try and test 2-3/8" combi's Tree valve not hooding rnntea: iwzsizuui s:vu:vo rm • • BP EXPLORATION Page 5 of 25 Operations Summary Report Legal Well Name: X-30 Common Well Name: X-30 Event Name: REENTER+COMPLETE Start: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date (From - To ~ Hours I Task I Code ~ NPT ~ Phase 9/18/2007 10:30 - 15:30 5.00 WHSUR P 15:30 - 15:45 0.25 WHSUR P 15:45 - 17:45 2.00 WHSUR P 17:45 - 18:30 I 0.751 RIGU I P 18:30 - 21:00 I 2.501 RU 21:00 - 00:00 I 3.001 RU 9/19/2007 00:00 - 02:30 2.50) RUNCOI~j'P 02:30 - 03:00 0.50 RUNCO 03:00 - 06:00 3.00 STWHIP P 06:00 - 09:15 I 3.251 STWHIP P 09:15 - 13:15 4.00 STWHIP P 13:15 - 13:30 0.25 STWHIP P 13:30 - 14:45 1.25 STWHIP P 14:45 - 17:00 I 2.251 STWHIPI P 17:00 - 17:50 I 0.83 {STWHIPI P 17:50 - 18:15 I 0.421 STWHIPI P 18:15 - 18:30 I 0.251 STWHIPI P 18:30 - 19:15 0.75 STWHIP P 19:15 - 20:45 1.50 STWHIP P 20:45 - 21:15 I 0.501 STWHIPI P 21:15 - 22:15 I 1.001 STWHIPI P 22:15 - 00:00 I 1.751 STWHIPI P Spud Date: 4/11/1995 8/7/2007 End: Description of Operations WHDTRE BOP Test WHDTRE Held PJSM on pulling TWC. WHDTRE RU DSM lubricator and PT to 500 psi. Pulled TWC and WHP = 0 psi. RD Lubricator WHDTRE Hold PJSM with wireline crew. Spot SLB unit. Crew change with rig and wireline crew RUNCMP Bring tools to floor. Rig up to run slickline. Run in hole. Recover ball & rod from 11,330'. RUNCMP Run in hole to pull DCK valve from GLM #5. recover valve. Run in hole to set dummy in GLM #5. RUNCMP Continue to slickline. Retrieve RHC plug body. RUNCMP RD SLB slickline. WEXIT PJSM with crews. PU injector and position on floor. Repair packoff oiler system Rig up to pull coil across pipe shed. Pull and stab same in to injector. WEXIT Load coiled tubing with 80 bbl of flo-pro Prep wire end for reversing fluids WEXIT Cut CT following slack management Cut15 ft and found wire. Megged wire (OK) Installed CTC and rehead. Pull tested to 40k. BHI heading up. PT CTC and QC's to 3500 psi WEXIT PJSM on PU CO BHA WEXIT PU 5 ft lubricator. Set injector in bung hole and PU BHA as per WSL. PU BHA and stabbed on well WEXIT Set counters and run in the hole to clean out plugs. RIH to 220 ft and open EDC WEXIT Circulate wellbore to flo-pro Qp = 2.5 bpm at 3340 psi WHP=117 psi WEXIT SD and close EDC. trying to work past the stub at 11,400 ft Tried several thing and was unable to pass 11,400 ft. WEXIT PUH to confirm tie-in at 11300 ft. Add 2' correction. This should put us on depth. WEXIT Tag up again at 11398'. Attempt to mill ahead. 4160 psi fs at 2.49 bpm in. Appear to be milling ahead. Mill 1.1' to 11,399'. Driled off. Run in hole circulating. Tag at 11,432'. Mill ahead from 11433.1. Mill to 11434'. Lost all rtns. WEXIT Reduce circ rate to 1.1 bpm. RIH chasing plugs to PBTD of 12,995'. Returns slowly increasing while RIH. Tag up at 12,626'. Milf through and continue in hole. Tag at 12,912'. Stall several times. Discuss with town. This is deep enough. Return line plugging off some where at surface. WEXIT Isolate choke manifold and well. Open hard line to check for .restriction. Cleared same. WHP back to 30-70 psi (normal). WEXIT Log CCL down from 12,600' to 12,912'. Getting a lot of material back over shaker. Getting gas back to surface. Send rtns outside. Monitor flow back tank and down stream hard line pressure. Returns cleaned up. Bring fluid back inside. WEXIT Circulate out of hole at 80%. Continue to get some material across shaker. Printed: 10/2312007 3:00:05 PM • ~3T~ x-~ BP EXPLORATION Page 6 of 25 Operations Summary Report Legal Well Name: X-30 Common Well Name: X-30 Spud Date: 4/11/1995 Event Name: REENTER+COMPLETE Start: 8/7/2007 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 9/19/2007 22:15 - 00:00 1.75 STWHIP P WEXIT Power pack not working quite right. High injector hydraulic pressure, slow pull rate (35 fpm). 9/20/2007 00:00 - 03:30 3.50 STWHIP P WEXIT Continue to circulate out of hole. Continue to get black "sludge" from well in decreasing amounts. Trouble shoot injector while POOH with SLB mechanic. Continue to POOH. Jog back in hole to 250', then tag up again. 03:30 - 05:30 2.00 STWHIP P WEXIT Get off well. Unstab coil. LD milling BHA. Prep whipstock setting BHA. Orient to tray face. Work on SLB injector. 05:30 - 09:30 4.00 STWHIP P WEXIT Stab coil. Get on well. RIH Working on injector Stopped at 11590 ft to tie-in to PDC 09:30 - 10:15 0.75 STWHIP P WEXIT Logging tie-in Tied in to to of Sag (-12 ft) 10:15 - 10:30 0.25 STWHIP P WEXIT RIH to 12,600 ft 10:30 - 11:25 0.92 STWHIP P WEXIT RIH logging with CCL to 12,880 ft. Stopped CCL log and conducted wt check 48.5k Orient TF to 30 deg LOHS. RIH to 12912 ft and PU to 12,888 ft, closed EDC and set TOWS at 12,876 ft. Set at 3400 psi and a bit. PU, free and RIH set wt. 11:25 - 14:45 3.33 STWHIP P WEXIT POOH filling hole at 1:1 MM plugged off while POOH BHT at 224 deg in the pert area. BHT increased in the perforated intervals 14:45 - 16:45 2.00 STWHIP P WEXIT PJSM prior to tagging up. LD WS setting BHA. PU milling BHA # 3 16:45 - 19:45 3.00 STWHIP P WEXIT RIH with milling BHA open EDC mixing flo-vis to brin LSRV's up to 60k. Get a little gas back. Flow check negative. Continue to RIH. 19:45 - 20:15 0.50 STWHIP P WEXIT Log GR tie in to geo's PDC log from 11,660'. Subtract 18' correction. 20:15 - 20:45 0.50 STWHIP P WEXIT Continue to run in hole. Ta whipstock at 12,883'. 20:45 - 00:00 3.25 STWHIP P WEXIT Mill ahead from 12,883'. 3450 psi at 2.38 bpm in/2.35 out. Establish pattern. Mill ahead at 0.1' per six minutes. DHWOB varying from 0.38 to 1.78k#. Mill to 12,886'. 9/21/2007 00:00 - 02:45 2.75 STWHIP P WEXIT Continue to mill window from 12,886'. 3450 psi fs at 2.36 in/out. DPSI: 120. DHWOB: 0.0 to .75 k#. Drilled off to no WOB at 12,889.2'. Drill formation to 12900'. "Uncorrected" TOW is 12880'. BOW: 12891'. RA tag: 12,889' These may be adjusted once RA is tied in to PDC log. 02:45 - 03:30 0.75 STWHIP P WEXIT Sack ream window three times. Dry drift running in hole. Appears to be smooth. 42k# coil up wt. 03:30 - 06:50 3.33 STWHIP P WEXIT Open EDC. Circulate out of hole. 06:50 - 08:10 1.33 STWHIP P WEXIT Tagged up, LD Milling BHA and gauge mills. 08:10 - 13:30 5.33 DRILL P PROD1 RU and revese in 80 bbl SW for slack management. Cut off 30 ft CT and 4 ft wire. Install CTC and pulled test to 36k Rehead and PT to 3900 psi. PU BHA #4 with USR tool 13:30 - 14:15 0.75 DRILL P PROD1 Set counters and install UTM on level wind. 14:15 - 16:45 2.50 DRILL P PROD1 RIH with build section BHA Started pulling mud out of pits for upcoming mud swap 16:45 - 17:00 0.25 DRILL P PROD1 Log tie-in at 11,632 ft, -23 f. The counter wheel on the injector looks like it slippping from slug build upon the wheel or wheel Printed: 10/23/2007 3:00:05 PM TREE = 4" CNV WELLHEAD = FMC ACTUATOR= BAKER KB. ELEV = 70.01' BF. ELEV = 39.00' KOP = 1696' Max Angle = 93 @ 12417' Datum MD = 11522' Datum TV D = 8800' SS DRLG DRAFT 10-3/4" CSG, 45.5#, L-80, ID = 9.953" ~~ 3277' Chem cut TBG I 11,396' Minimum ID = 2.8" @ 13307' 2-7/8" OTIS X NIPPLE TOP OF 5-1/2" LNR ~--~ 11482, 4-1/2" TBG, 12.6#, L-80..0152 bpf, ID = 3.958" 11485' 7-5/8" CSG, 29.7#, NT-96, ID = 6.875" I~ PERFORATION SUMMARY REF LOG: GR/CCL ON 05/16/96 ANGLE AT TOP PERF: 59 @ 11608' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 11608 - 11628 isolated proposed 3-3/8" 6 11680 - 11740 isolated proposed 3-3/8" 4 11940 - 12130 isolated proposed 3-3/8" 4 12170 - 12350 isolated proposed 3-3/8" 4 12430 - 12620 isolated proposed 3-318" 4 12660 - 12950 isolated proposed 2 6 13360-13650 O 10/09/07 2 6 13720-14270 O 10/09!07 Top of Cement PBTD 5-1/2" LNR, 17#, L-80, .0232 bpf, ID = 4.892" 12500' 12995' 13043' - 024 ' ~4-1/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3509 3248 45 KBG2 DOME BK 16 10/29/07 4 5870 4896 46 KBG2 SO BK 20 10/29/07 3 7775 6265 44 KBG2 DMY BK 0 09/16/07 2 9475 7510 41 KBG2 DMY BK 0 09/16/07 1 11009 7914 40 KBG2 DMY BK 0 09/16/07 11,286' 4-1;2" HES X NIP. ID = 3.813" 11,307' 7-5/8" x 4-1/2" BKR S-3 PKR, ID = 3.93" 11,331' _ 4-112" HES X NIP, ID = 3.813" 11,403' Bottom of UNIQUE Overshot 11427' 4-1/2" HES X NIP, ID = 3.813" 11438' 7-5/8" x 4-112" BKR SABL-3 FKR, ID = 3.93" 11462' 4-1/2" HES X NIP, ID = 3.813" / 11473' 4-112" HES XN NIP, ID = 3.725" ml e to 11485' 4-1/2" WLEG, ID = 3.958" 11489' ELMD TT LOGGED 05/16/96 2284'-12424' ~~ POSSIBLE CMT SHEATH, ID=3.75" 128$0' -iMechanical Whipstock 12, 516'Otis "X" Nipple ID =2.8" 13,307' 3-3116 x 2-718 X-over 3-3/16" X 2-7/8" cmt'ed and perfed~-1 14,320' DATE REV BY COMMENTS DATE REV BY COMMENTS 05115/95 MDO ORIGINAL HORIZ COMPL 07/19/01 RN/TP CORRECTIONS 06/02/04 JLA/KAK WANER SAFETY NOTE 08/02/05 EZUTLH DELETEWANERSFTY NOTE 10/10/07 Nordic 2 CTD 10/29/07 DAV/TLH GLV C/O PRUDHOE BAY UNfr WELL: X-30 PERMIT No: 1950410 API No: 50-029-22550-00 SEC 7, T10N, R14E BP Exploration (Alaska) X-30A · STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: 11/09/04 Rig No.: 2 Rig Phone: 659-4398 Op. Phone: 659-4393 DATE: 9/12/07 Rig Fax: 659-4356 Op. Fax: 659-4356 Contractor: Nordic Rig Rep.: McKeimanlPederson Operator: BPX Rep.: Hildreth/Goodrich Field/Unit & Well No.: ~. . 11\ PTD # fWii4M. ." '. ",. 6 1._ :sù¡¡t, 7T c.. hGr t',~ 1..-o\.\~,c.J Operation: Drlg: Workover: X Explor.: Test: Initial: X Weekly: Bi-Weekly Test Pressure: Rams: 250/3500 Annular: 25013500 Valves: 250/3500 TEST DATA MISC. INSPECTIONS: Test Result Location Gen.: P Housekeeping: P PTD On Location P Standing Order Posted P BOP STACK: Quantity 1 NA 1 1 1 2 1 Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Well Sign DrI. Rig Hazard Sec. Size 13 5/8" NA 2 7/8 x 5 1/2 Blind 31/8 31/8 31/8 MUD SYSTEM: Visual Test Alarm Test Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P Test Result P P P Test Result P NA P P P P P NA FLOOR SAFETY VALVES: Quantity Test Result Upper Kelly Lower Kelly Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 14 FP Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 2950 P Pressure After Closure 1600 P 200 psi Attained 30sec P Full Pressure Attained 3min 12sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4@2100psi Test Results Number of Failures: ! Test Time: ~ Hours Repair or replacement of equipment will be made within days. Inspector 659-3607, follow with written confirmation to Su rviser at: Remarks: Choke line flange failed replaced gaskets and retested ok. Choke valves #3 & #4 failed greased #4 and retest ok rebuild #3 and retest ok 24 HOUR NOTICE GIVEN YES X NO Date Test start 08110/07 12:00 Time Finish Comrxments tested 25 Notify the North Slope Waived By 1200 Witness Lou Grimaldi 17:00 BOP Test (for rigs) BFL 11/09/04 SCANNED S E P 1 9 2007 Nordic 2 BOP 9-12-07.xls ... . . !if . . SARAH PALIN, GOVERNOR AI,ASIiA. OIL AND GAS COIWSERVATIOIW COMMISSION 333 W 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Sarber CT Drilling Engineer BP Exploration Alaska PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU X-30 Sundry Number: 307 -177 \qç....ù4-1 SCANNED MAY 3 1 2007 Dear Mr. Sarber: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED thi;2L day of May, 2007 Encl. · ~ Sjþ/7 c/lr 5..~..o1 ~,7 RECEIVED '" ~ STATE OF ALASKA ~. ALASKA Oil AND GAS CONSERVATION COM.IO~.tJ\o1 MAY 2 5 2007 APPLICATION FOR SUNDRY APPROV AMaska Oil & G· C ' , 20 AAC 25 280 as ons. CommIssIon a 1, Type of Request:~bandon o Suspend o Operation Shutdown o Perforate o Time Extension -..8 :fGf..- o Alter Casing -:>17" 1.11 p{Repair Well Ji(PIUg Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program ,:pl'PUII Tubing o Perforate New Pool o Waiver o Other 2. Operator Name: 4. Current Well Class: 5, Permit To Drill Number BP Exploration (Alaska) Inc, ~ Development D Exploratory 195-041 /' 3. Address: D Service D Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22550-00-00 i 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU X-3D /' Spacing Exception Required? DYes ~No 9. Property Designation: 10. KB Elevation (ft): 11. Field / Pool(s): /' ADL 047475 / 70.1' Prudhoe Bay Field / Prudhoe Bay Pool 12.>./ /' / ..... .... PRESENT WELL CONDITION SUMMARY ... ./.. < </ < ...... Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13043 9055 / 12955 9048 11473 None Casina Lenath Size MD TVD Burst Collacse Structural Conductor 80' 20" iii' 111' 1490 470 Surface 3247' 10-3/4" 3277' 3083' 5210 2480 Intermediate 11601' 7-5/8" 11628' 8924' 6890 4790 Production Liner 1561' 5-112" 11482' - 13043' 8850' - 9055' 7740 6280 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: I.."."..."", Tubing Grade: Tubing MD (ft): 11608' - 12950' 8914' - 9048' 4-112", 12.6# -~" 'Ac1 L-80 11485' Packers and SSSV Type: 7-518" x 4-112" Baker 'SABL-3' packer I Packers and SSSV MD (ft): 11438' 13. Attachments: 14, Well Class after proposed work: ~ Description Summary of Proposal D BOP Sketch D Exploratory ~ Development D Service D Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencina Ocerations: August 1, 2007 DOil o Gas o Plugged ~ Abandoned 17, Verbal Approval: Date: o WAG OGINJ DWINJ D WDSPL Commission Representative: 18, I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Greg Sarber, 564-4330 Printed Name GrM Sarber . \ Title CT Drilling Engineer P: J~aJ>j ~ Prepared By Name/Number: Signature V)~ Phone 564-4330 DateS-ZS--ð ~Terrie Hubble, 564-4628 /1 Commission Use Onlv -- I Sundry Number: 307- / "77 Conditions of approval: Notify Commission so that a representative may witness o Plug Integrity ß130p Test D Mechanical Integrity Test D Location Clearance Other: Subsequent Form Required: 10'-404 'Ø¿ APPROVED BY ~ DateS.,3/,O :r Accroved Bv: "/1 /v SSIONER . TI:IE COMMISSION Form 10-403 Revised 06/2006 V' t(}R f G I' A L ~-WBPIb). { ~itln Duplicate '. ~ ~ . . To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Greg Sarber CTD Engineer Obp Date: March 12, 2007 Re: X-30A Sundry Approval Sundry approval is requested to abandon perforations on well X-3D. X-30 is currently shut in for T x IA communication. Well X-30 began production in May 1995 as a horizontal producer in Zone 4 periphery. Original production was over 3700 BOPD, but the well decreased to 400 BOPD by late 1997. Because there was no injection support in the area, the pressure fell from 3625 psi in 5/95 to 3362 psi in 8/98. Offset injectors X-33 and X-36 began water injection in mid 1998, and the production decline reduced over the next year. An acid stimulation on 5/14/00 had little effect on production. X-30 had good MI responses to both offset injectors. X-30 was on production full time until a Gas Lift Survey on 12/2/03 identified a tubing leak at 8,455' MD, A caliper log on 3/31/04 showed the tubing in poor condition with 41 joints having 40-85% wall loss and 10 joints with 85%+ wall loss and possibly multiple holes. The majority of the damaged tubing is located between GLM's #3 & 4, but other portions of the tubing are not in good shape. The well passed a No Flow Test (NFT) on 4/16/04, and was allowed to produce on a waiver. An MITOA failed on 4/19/04, so an OA down squeeze was performed on 5/27/04. The follow up MITOA on 5/31/04 passed. Well X-30 failed an NFT-IA on 4/20/05, and it was shut in for flow to surface status. A CMIT TxlA to 3500 psi and an MITOA to 2000 psi passed 12/10/06; confirming production casing and surface casing integrity. The well remains shut in, ./ The well is scheduled for a work over to replace the existing 4-1/2" L-80 production tubing with 4-1/2" chrome tubing. A stacker packer completion will be made. (See attached schematic). Immediately following the work over a coil tubing sidetrack will then be made by performing what is essentially a toe drill out of the existing parent well bore. (A whipstock will be used at TD to avoid milling the float equipment with coil tubing.) The purpose of the sidetrack will be to add reserves from the targeted area in the periphery of the water flood, The intent is to retain access to the current drainage area reserves and access incremental reserves from an extension of the well bore to the southeast to evaluate the down dip limits of the reservoir. A portion of the perforations in the parent well bore will be abandoned by the sidetrack liner cement job. The cement job on the ./sidetrack liner is planned to come up to 12,500' MD in the parent well bore (Inclination 89,9 deg). Perforations in the parent well above this depth are intended to be preserved, Perforations below this depth are intended to be abandoned by the liner cement job, The plan is to leave 520' of open perforations in the parent well bore above the cement top depth while abandoning 410' below the cement top. (See Schematic Attached) CT 5id.c~1( \'é'~UI.re5 Ose~* PTj) ú(e,¡c. t! . <;'/3i/c.ì7 REASON FOR SUNDRY: In order to achieve adequate isolation for the 2-7/8" liner cement job, it will be necessary to abandon a portion of the perforations in the existing parent well bore below 12,500'. The possibility of reperforating these zones at a future date is retained. Pre-Rig Work: 1, 0 2. 0 3. 0 4. S 5. S 6. S 7. E 8. E 9. 0 10. 0 Functions test LOS PPPOT-T,IC Install 2nd full opening valve on IA. Pull SSSV and plug in XN nipple at 11,473'. Drift for chemical cut in 4-1/2" Tubing. Run Multifinger caliper from TTail to surface. Set HES fast drill plug in TTail between X and XN nipples at 11,468'. (Ref Tubing Tally) Chemical cut at 11,396', (Middle of first full joint above the pkr) CMIT T x IA to 3500 psi. MIT OA to 2000 psi. ,./ Load T and IA with seawater circ thru chem cut and FP T & IA to 2000' with diesel. . . 11. 0 12. 0 13. 0 14, 0 Bleed T, lA, OA to zero. Set BPV Bleed production flow lines and GL lines down to zero and blind flange Remove wellhouse, level pad Rig Workover Operations: (Scheduled to begin on August 1, 2007) 1. MIRU Nordic rig #2, pull BPV. 2. Circulate well to clean KWF thru tubing cut, set TWC. / 3. ND tree, NU BOPE and test. Pull TWC ' / 4. Pull old 4-1/2" L-80 production tubing from chemical cut at 11,396'. 5, RU Slickline, Make 8-1/2" gauge ring junk basket and LIB runs. 6. Begin running new 4-1/2" completion below Haliburton RTTS storm packer. 7. Set storm packer. 8. Replace IC Packoffs 9, Retrieve storm packer. 10. Continue running 4-1/2" 13Cr-80 VAM Top tubing string with new 9-5/8" packer, Unique overshot. Packer -11,350'. ¡/ ./ 11. Space out. Circ Inhibited brine into IA. Set packer. Test IA and Tubing. Circ in FP into top 2000' of IA. 12. Set TWC. ND BOPE, NU Production tree and test. V' '.:J Rig Sidetrack Operations: (Scheduled to begin on August 7, 2007) 1. NU 7-1/16" CT Drilling BOPE and test. 2. RU Slickline. Retrieve ball and rod, RHC plug. Dummy off upper GLM, 3. RU Coil. RIH, drill up fast drill plug at 11,468', and open up XN nipple to 3.80", 4. Set whi stock with to at -12,950'. 5. Mill 3,80" window at 12,950'. J¡ src:tît P&A ~- 30 A 6. Drill build/turn section with 3,75" x 4.125" bicenter bit, and land well. 7. Drill lateral section to 16,475'. Possibly longer, see discussion in PTD summary. 8. Run and cement a 2-7/8" x 3-3/16" L-80 liner string, abandoning perfs below 12,500'. 9. Make a cleanout run with mill and motor and SWS CNL logging tool. 10, Perforate well. 11. Circulate well to KWF brine. FP well to 2000' with diesel. 12. Set BPV, ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 13. RDMO Nordic 2. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run Live gas lift design. 4. Rerun SSSV when running GLV's, 5. Test separator (-600' of prefs) Greg Sarber CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble . I SAFETY NOTES: GAS LFT MANDRELS ST MJ TVD DE\! TYÆ VLV LATCH PORT DATE 6 3001 2810 39 CAM BK 5 5845 4808 45 CAM BK 4 782Q 6228 44 CAM BK 3 9422 7400 42 CAM BK 2 10631 8301 48 CAM BK 1 11318 8697 58 CAM BK . TREE'" WB..1..HEAD'" AGfUÀ fÕR~'; , kB:B..èi';' BF ELEV '" KOP'" M3x Angle '" Dàium W'" oàtum ND '" 4"CMl FMC BAKER 70,01' 3àòii 1696; 93 @ 1241r '11522; , 8800'SS X-30 . 10.3/4" CSG, 45.5#. L-80, Ð '" 9.953" Minimum ID :::;: 3.725" @ 11473' 4-1/2" HES XN NIPPLE 1142T 11438' TOP OF 5-112" LNR 4-1/2" TBG, 12.6#, L-BO. .0152 bpf, Ð '" 3.958" 7-518" CSG. 29.7#, NT-96. Ð '" 6.875" I PERFORATION SUMM'l.RY REF LOG: GRlCQ ON 05/16/96 ANGlE AT TOP PERF: 59@ 11608' Note: Refer to Production œ for historical perf data SIZE SPF NTERVAL OpnlSqz DATE 3-3/8" 6 11608 -11628 C 05116/96 3-3/8" 6 11680 -11740 C 05116196 3-3/8" 4 11940 - 12130 C 05116/96 3-3/8" 4 12170 -12350 C 05116196 3-3/8" 4 12430 - 12620 C 05116/96 3-3.18" 4 12660 - 12950 C 05116196 5-1/2" LNR, 17#. L-BO. .0232 bpf, Ð "'4.892" DATE REV BY C~fvlENTS DATE REV BY COM'v1ENTS 05115195 MOO ORIGINAL HORlZ COMPL 07119/01 RNITP CORRECTIONS 06102104 JLA/KAK WMJER SAFETY NOTE 08102.105 EZLffLH DELETE WAIVER SFTY NOTE 09125105 WTSlTLH XXN Pl.UG (07126105) t)(15~)'~í 31 /¿I 07 I 2194' 4-112" HES HXO SSSV NIP, D'" 3.813" 4-112" HES X NP, ID" 3.813" 4-112" HES X NP, ID" 3.813" 4-112" WLEG,ID" 3.958" H ELMJTT LOGGED 05116196 I PRUDHOE SA Y UNIT WELL: X- 30 ÆRMTNo: "\950410 API No: 5O-02~22550-oo SEC 7. T10N, R14E BP Exploration (Alaska) \~fo.d 3~ M!1fJ"'\i'Ww"ll ;~!'€1:~F ïJt;¡ 21.18 tt 4,67 tt 1.50 1.133 2.67 RE: Question on Sundry Needs e e Thanks Tom, I will prepare a sundry for the wlo, and an application for the permit to drill. Cheers, Greg \~5-()L\ \ From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us) Sent: Tuesday, March 06, 2007 8:47 AM To: Sarber, Greg J Subject: Re: Question on Sundry Needs Hi Greg, You will need a sundry to conduct the workover portion of your plan (replace tubing). You then will perform the sidetrack operation. You can describe in the new well plan that some of the existing perforations will be plugged with the new liner cement. My read is since no perforations from the original well are planned to remain below the sidetrack point, that the well name will become X-30A. If your cement winds up high on the liner job, I don't think that is an issue since you will just re-shoot. Regardless, holes will exist where holes were. Hope this answers your question. Call or message back. Tom Maunder, PE AOGCC ti~ MAR 0 9 2007 Sarber, Greg J wrote, On 3/512007 4:26 PM: Dear Tom, I have a question for you about whether a sundry approval is needed. I am working on well þJ X-30. This is a horizontal production well completed in Ivishak zone 4. It currently has badly corroded tubing causing T x IA communication. It has also failed an NFT-IA, so is secured with a tubing tail plug and the well shut in. We plan to move Nordic 2 onto this well sometime this summer. A workover will be performed changing the 4-1/2" L-80 production tubing to 4-1/2" chrome, using a stacker packer completion. After we do the workover, we plan to set a whipstock near TD in the production liner, and drill a coil tubing sidetrack. The cement job on the sidetrack liner is planned to come up to 12,500' MD (Inclination 89.9 deg). Perforations in the parent well above this depth are intended to be preserved. Perforations below this depth are intended to be abondoned by the liner cement job. The plan is to leave 520' of open perforations in the parent well bore above the cement depth while abondoning 410' below the cement top. The inclination of the top perforation in the well is 59 deg. My question for you is, is a sundry needed to abondon the perforations in the parent well below the cement top, if there remain existing perforations open in the parent well in the same zone (zone 4). This is a horizontal well, so predicting the cement top using current coil tubing technology is not exact. We have designed the job so that the cement top is at a relative "high" in the parent well. However annular spaces are small, and a slight difference in cement volumes drastically effects the height of the cement top. What happens if the cement job does not go off as planned, and we lose all the perforations above 12,500'? A sketch showing the well geometry is attached to this email to help explain the situation. 3/612007 9:31 AM .. Schlumberger Alaska Data & Consultinq Services 2525 Gambell Street, 3uite. ;1.1 Anchorage, AK 99503-2838 ATTN: Beth ~CANNED ~JAN ~Z {) 2006 Well Job # Log Description Date BL Z-01 11087166 LDL 08/05/05 1 Y-13 N/A PRODUCTION LOG 05/01/05 1 L2-14B 10670029 PROD PROFILE 08/20/04 1 Y-08A 11047356 MEMORY/SENSA LDL 10/15/05 1 X-36 11075908 MEMORY INJECTION PROFILE 08/17/05 1 X-30 ¡q5-()4J 10662973 GLS 12/02/03 1 S-29A 11087187 INJECTION PROFILE 10/04/05 1 P2-01 11072880 LDL 08/06/05 1 OS 12-08C 11087208 SBHP SURVEY 12/24/05 1 D.S. 09-28A 11094347 LDL 12/28/05 1 P2-34 N/A INJECTION PROFILE 06/02/05 1 Q-05A 11087203 SBHP SURVEY 11/27/05 1 NK-09 11062632 PROD PROFILE WIDEFT 07/01105 1 NK-38A 11075902 MEMORY PROD PROFILE 07/27/05 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: NO. 3642 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage. AK 99501 Field: Prudhoe Bay, Milne Pt. Color CD Alaska Data & Consulting Services 2525 Gambe" Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ Received be~l-1AOOTh h 01/04/06 .-- .~ MEMORANDUM TO: THRU: State of Alaska Alaska Oil and Gas Conservation Commission Julie Heusser, CommiSsioner Tom Maunder, ~3--~ ~o-~~ P. I. Supervisor FROM: jeff jOnes, SUBJECT: Petroleum Inspector : DATE: December 9, 2000 Safety Valve Tests Prudhoe Bay Field BPX / X-Pad SatUrdaY, December 9, 2000: I traveled to BPX's X Pad in the Prudhoe Bay Field to witness Safety Valve System tests. Merv Liddelow, BPX representative in charge of the testing, performed the tests in a safe and proficient manner. Of the 26 wells tested, 3 failures were witnessed. Well X-14A's SSV failed to close and well X-19B's pilot was frozen and the SSV failed to close. Mr. Liddelow indicated to me on 12/10/00 that these items have been corrected and successfully re-tested. The AOGCC test reports are attached for reference. I conducted 26 well house inspections Concurrent with the SVS tests. A slight crude oil leak was noted on a wellhead flange of well X-19B. Mr. Liddelow indicated he would have this item addressed. No other exceptions were noted. SUMMARY: I witnessed SVS tests and conducted well house inspections on BPX's X Pad. 26 wells, 53 components tested, 3 failures. 26 well houses inspected. Attachments: SVS PBU X Pad 12-9-00 JJ NON-CONFIDENTIAL SVS PBU X Pad 12-9-00 JJ.doc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBU/X Pad Separator psi: LPS 174 Date: 12/9/00 HPS 723 Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number. Number PSI PSI Trip Code Code Code Passed GASorCYCLE X-01 1790540 174 125 125 P P OIL X-02 1790690 174 125 125 p P OIL X~03A 1980860 723 550 400 P P OIL X-04 1790890 174 125 '125 P P 0IL x-05 1791040 174 125 115 p P OIL · x-06 '1800090 x-07 1800130' 174 125 '' 110 P P OIL , X'08 1800360 174 125 115 P P OIL X-09 1800280 X-10 1800430 1~4 12'5 120 'P ~' OIL X-11A 1990780 2000 '1950 e e P WAG X-12 1800440 174 125' 110 P P OIL X-13A 1930650 174 125 100 P P OIL , X-14A 1921430 174 125! 120: ~P 5 OIL X-15 1800740,' 174 125 125~ P P oIL x-16 1811720 174 125 .~25 P P OIL X-17 1811690! 723 556' 520 P P OIL , X-18 1811620 174 125 120 P P OIL X-19B 1961300 174 125 0 2 5 OIL iX-20 1940670 X-21A 1991080 174 125 110 P P OIL X-22 1931300 174 125 110 P P OIL X-23 1840610 X-24A 1991250 X-25 1840340 174 125 120 P- P OIL X-26 1840300 X-27 1840690 174 125! 120 P P OIL ,, X-28 1'931140 , X-29 1931390 , X-30 1950410 174 125 115 P P OIL IX-31 1931980~ 174 125 120 P P 0IL , X-32 1931620 174 125 125i P P OIL X-34 1931720 174 125 115 P P OIL X-35 1931990 174 125 90 P P OIL 12/13/00 Page 1 of 2 SVS PBU X Pad 12-9-00 JJ.xls Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE i X-36 1961670 Wells: 26 Components: 53 Failures: 3 Failure Rate: 5.6% []9o var Remarks: 12/13/00 page 2 of 2 SVS PBU X Pad 12-9-00 JJ.xls T~IE MATE~ UNDER T~S COVER ~S ~EEN ON. OR BEFORE M C:LOlh~'~II:~LM. DOC PL W A T E IA L U N D ER TH IS M AR K ER ALASJ.-~,.A_. OIL AND GAS CONSERVATION COMMISSI, LO~ REPORT L,-' SUNDRY WELL OPL._ :ATIONS ,. Operations performed: Operation shutdown~ Stimulate x Plugging__ Pull tubing__ Alter casing __ 'Repair well__ Perforate__ Other ~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora_cle, Alaska 99519-6612 4. Location of well at surface 4722' NSL, 876' WEL, SEC. 7, TION, R14E At top of productive interval 3074' NSL, 172' WEL, SEC. 18, TION, R14E At effective depth 3213' NSL, 265' WEL, SEC. 18, TION, R14E At total depth 1980' NSL, 246' WEL, SEC. 18, TION, R14E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KB=7¢,01' 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number X-30 9. Permit number/approval number 95-41 / 10. APl number 50- 029-22550 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured true vertical 13043' feet Plugs (measured) 9055' feet Effective depth: measured true vertical 12955' feet Junk (measured) 9048' feet Casing Length Structural -. Conductor 111' Surface 3246' Intermediate 11597' Production -. Liner 9921' Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20" 260 sx Arcticset 142 142 10-3/4" 965 sx CS 111,375 sx 3277 3083 7-5/8" 265 sx Class 'G' 11628 8924 5-1/2" 185 sx Class 'G' 11482-13043 8850-9055 11940~12130~ 12170~12350~ 12430'-12620~ 12660'-12950' true vertical subsea 9008'-9016', 9017'-9027', 9027'-9028', 9028'-9048' :':? F'.,' ': );' Tubing (size, grade, and measured depth) 4-1/2" to 11485' Packers and SSSV (type and measured depth) Packer @ 11438' SSSV @ 2194' 13. Stimulation or cement squeeze summarySee Attachment Intervals treated (measured) Treatment description including volumes used and final pressur6 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 201 691 220 0 203 693 222 0 Tubing Pressure 227 233 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas__ Suspended 17. I hereby-c'Crtify,~hat t~.f~ for~'~ing is true a~Qd ct~rect to the best of my knowledge. ~ . .... i~ /.... r / ...% _ Form 10-404 Rev 06/i 5'/'~8 ' ' . ,- _, ~ Title Technical Assistant IV Service D ate ¢/:,/'?//~' [.~..., SUBMIT IN DUPLICATE X-30 DESCRIPTION OF WORK COMPLETED Stimulation Operation 07/13/99 A Acid Stimulation Treatment was performed using the following fluids: SUMMARY MIRU Dowell CTU #2. Tested BOPE. Circulate kill well with 427 bbls 2% KCI water. Layed in 24 bbls 12/10 HCl/Xylene across perforations 11940'-12800'. SD and soaked for 1 hour. Washed same perforated interval with 50 bbls of 12/10 HCl/Xylene and let soak for 1 hour. Over-displaced acid with 150 bbls 2% KCIwater. POH. RDMO. POP'dwell. Fluids Pumped BBLS. Description 643 Freshwater w/2% KCL 74 12/10 HCL/Xylene 717 Total Pumped REC iVED !. ~)'7 1 2 1999 Oil & Gas Cons. Commission ]~ J"l ¥ E.~ I'"l '!i © F' ¥ 95-OaJ i) PR,/GR /~0 ..... ~ TVD 9~ I - /,~'~ 07 :~ 0 1204~0 t~/~ ..~ ..... Oh- SSVD/HINAL ~ .... 95 .... ()~1 DPR,/GR ~ i0870-i20q8~2 MD I~1~ 5 .... 6 (.)o/9,1.): 9 5 0 8/' '2 2/'/95 i) 8//o ")/' q 5 (.)8//2 i,/96 O. 8. ,/ <. '') i// ,.:.q ...'::, 08//":' i / 9 i 0-¢~ 07 krR~ COMF'L. ET]:ON DATE y/'ly'/~l'i/ Ar'e d r' y W a s t: h e Ar"e we'i'l we i 1 '~ s : n (.? 0 M J'4 E N "F S _,d e 'ie. d ° F' C V I'" E! r":.. ~(~ (J o,,, STATE OF ALASKA ALASKA~.Q.t.L AND GAS CONSERVATION COMMISSION---- REPORT O! SUNDRY WELL OPEF,. ,TIONS · ,~perations performed: Operation shutdown~ Stimulate x Plugging__ Pull tubing__ Alter casing __ Repair well__ Perforate Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora_cle, Alaska 99519-6612 4. Location of well at surface 4722' NSL, 876' WEL, SEC. 7, TION, R14E At top of productive interval 3074'NSL, 172' WEL, SEC. 18, TION, R14E At effective depth 3213' NSL, 265' WEL, SEC. 18, TION, R14E At total depth 1980' NSL, 246' WEL, SEC. 18, TION, R14E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KB=70.01' 7. Unit or Property name Prudhoe Bay Unit 8. Well number X-30 9. Permit number/approval number 95-41 / 10. APl number 50- 029-22550 11. Field/Pool Prudhoe Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 111' Surface 3246' Intermediate 11597' Production -- Liner 9921' Perforation depth: measured 13043' 9055' 12955' 9048' Size 20" 10-3/4" 7-5/8" feet Plugs (measured) feet feet Junk (measured) feet ORIGINAL Cemented Measured depth True vertical depth BKB 260 sx Arcticset 142 142 965 sx CS 111,375 sx 3277 3083 265 sx Class 'G' 11628 8924 5-1/2" 185 sx Class 'G' 11482-13043 11940'-12130', 12170'-12350', 12430'-12620', 12660;12950' true vertica§ubsea 9008'-9016', 9017'-9027', 9027'-9028', 9028'-9048' Tubing (size, grade, and measured depth)4-1/2" to 11485' Packers and SSSV (type and measured depth)Packer @ 11438' SSSV @ 2194' 8850-9055 13. Stimulation or cement squeeze summar~See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 201 691 220 0 203 693 222 0 227 233 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Ope/lations OilX Gas Suspended 17. I herebj~/~~~L~//~_~ce 'fy th the regoing is. tru~ ,~d correct to the best of my knowledge, Signe ........ _~ Title TechnicalAssistant IV Form 10-404 Rev 06/15/88 Service SUBMIT IN DUPLI~T~ X-30 DESCRIPTION OF WORK COMPLETED Stimulation Operation 05/14/98 A Tubing Wash was performed using the following fluids: SUMMARY Rig in hole with 3.5" jet swirl nozzle. Staged a 20 bbl xylene/diesel pill and tried to tag fill. Never sat down in tubing. Jetted top 3 GLM's and tubing to 8000' with diesel and xylene/diesel sweeps. POOH. Left 30 bbls of diesel in tubing and 6 bbls of methanol down flow line. Left well SI for slickline. Fluids Pumped BBLS. Description 40 Methanol 100 Diesel 40 30/10 Diesel/Xylene 180 Total Pumped HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 29 May 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION T~-I~A G-16-(44-11-11-13) 1 PFC/PERF FINAL BL+RF ~;-/27 A-19- 1 PFC/PERF FINAL BL+RF ~-~ R-11 ~ ~1- ~73 R-25~{32-31-11-13 ) 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF x-os x-os ! PFC/PERF FINAL BL+RF 1 CCL FINAL BL+RF 1 PLS FINAL BL+RF ~,~' - Oq,'l x-30 1 PFC/PERF FINAL BL+RF 1 GR/CCL FINAL BL+RF Run # ! Run # 1 Run # 1 Run # ! Run ~- 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 1120.09 3924.04 4589.03 5778.04 6234.06 6234.07 6654.04 6682.00 Please sign and return to: Attn. Rodney D. Pau!son Western Atlas ~gg_..g 5600 B Stree~ Suite 201 Received by: Anchorage, AK 99518 ~r F~7) 563-7803 Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 95-41 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612/~ 5o-029-22550 4. Location of well at surface ~ ~;?;'r.',';:.;.; /~:? ~l~,-~,~,~..~ ,~ /' 3./., ~Unit or Lease Name 4722'NSL, 876'WEL, SEC. 7, TION, R14E Bay Unit At Top Producing Interval 3074'NSL, 172' WEL, SEC. 18, TION, R14E At Total Depth i, ~.~'' i 11. Fielda~d'P~o? . · ' ' . .' i Prudhoe Bay ~eld/Prudhoe Bay Pool 1980' NSL, 246' WEL, SEC. 18, TION, R14E 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 70.1' ADL 047475 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 04/11/95 05/07/95 .,85'/t2~J'5 ,,5'/~,5'/~_ 5'J N/A feet MSLJ One 1'7. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVDI 19. Directional Survby 120. Depth where SSSV set 21. Thickness of Permafrost 13043'MD/9055' TVD 12955'MD/9048' TVD YES [] NO []I 2194'feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, Res, Gyro, DIL, Sonic, Neutron, Density, BHC 23. CASING, LINER AND CEMENTING RECORD SE'FRNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FroM HOLE SIZE CEMENTING RECORD AMOUNT PULLED .. 20" 91.5# H-40 31' 111' 30" 260 sx Arcticset (Approx.) 10-3/4" 45.5# NT80 30' 3277' 13-1/2" 965sxCSIII, 375sx'G', 140sxCSlJ .. 7-5/8" 29.7# L-80 27' 11628' 9-7/8" 265 sx Class 'G' 5-1/2" 17# L-80 11482' 13043' 6-3/4" 185 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Gun Diameter: 3-3/8", 4 spf 4-1/2" 11485' 11438' MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11940'- 12130' 9008'- 9016' 12170' - 12350' 9017' - 9027' 12430'- 12620' 9028'- 9027' 12660'- 12950' 9028'- 9048' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) May22, 1995 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL :GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA ~rief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. OCT 'i9 i995 Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 11601' 8910' Shublik 11627' 8923' Top of Sad/erochit 11909' 9005' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: X-30 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 04/10/95 12:00 SPUD: 04/11/95 06:00 RELEASE: OPERATION: DRLG RIG: NABORS 18E WO/C RIG: NABORS 18E 04/09/95 ( 1) TD: 0'( 0) 04/10/95 ( 2) TD: 0'( 0) 04/11/95 ( 3) TD: 0' ( 0) 04/12/95 ( 4) TD: 1085' (1085) MOVE SUBSTRUCTURE MW: 0.0 VIS: 0 MOVE PIPE SHEDS, ALL COMPLEXES FROM BADAMI TO X-PAD, PRUDHOE. MOVE SUB STRUCTURE FROM BADAMI %5, BROKE WELL HUB ON SUBSTRUCTURE. REPLACE WHEEL HUB, MOVING SUB ON BADAMI ICE ROAD. N/U 13 5/8" 5M BOP STACK MW: 0.0 VIS: 0 MOVE SUBSTRUCTURE FROM BADAMI TO X-PAD, MOVE RIG CAMP FROM BADAMI TO X-PAD, PIN DERRICK TO SUB, HANG BOARD AND C-SECTION, RAISE DERRICK, HANG PIPE CHUTE, REPOSITION WHEELS ON SUBSTRUCTURE, N/U 13 5/8" 5M BOP STACK TO SPOT IN SUB BEFORE MOVING RIG OVER WELL. MIX SPUD MUD & N/U DIVERTER MW: 0.0 VIS: 0 NU 13 5/8" 5M BOP STACK AND SPOT IN SUBSTRUCTURE ON PEDESTAL. SPREAD HERCULITE AROUND WELL FOR SUBSTRUCTURE, MUD PITS, FUEL TANK. N/U DIVERTER SPOOL AND HYDRIL, SPOT IN WELLHEAD EQUIPMENT AROUND WELL. SPOT AND LEVEL SUBSTRUCTURE OVER WELL X-30, MOVE IN AND SPOT ALL COMPLEXES. MOVE IN AND SPOT PIPE SHEDS, HOOK UP AIR, WATER AND STEAM TO RIG. R/U FLOOR, PREPARE PITS TO TAKE ON WATER. TAKE ON WATER IN PITS, N/U 20" RISER, FLOWLINE AND MOUSEHOLE, MIX SPUD MUD. DRILL AND SURVEY MW: 0.0 VIS: 0 GENERAL RIG UP ON FLOOR AND CELLAR, M/U HYDRAULIC HOSES FOR DIVERTER. P/U KELLY AND KELLY HOSE, MIX SPUD MUD. CLEAN, STRAP, CALIPER AND PU BHA, MIX SPUD MUD. FUNCTION TEST DIVERTER SYSTEM. M/U 13 1/2" BIT, P/U AND ORIENT MUD MOTOR, M/U INTEQ TOOL, R/U INTEQ SURFACE EQ. INTEQ SURFACE EQ WILL NOT OPERATE, NO BACK UP EQ ON SLOPE, REPAIR EQ ON RIG FLOOR. SPUD IN WELL @ 1800 HRS 04/11/95, DRILL AND SURVEY 13 1/2" OPEN HOLE FROM 110' TO 1085' OC'[ "! 9 1995 ~S~ Oi~ .& Gas Cons. Commission , ~chorage WELL : X-30 OPERATION: RIG : NABORS 18E PAGE: 2 04/13/95 ( 5) TD: 2515' (1430) 04/14/95 ( 6) TD: 3290' ( 775) 04/15/95 ( 7) TD: 3290' ( 0) DRILL AND SURVEY MW: 0.0 VIS: 0 DRILL AND SURVEY 13 1/2" OPEN HOLE TO 1118'. SHORT TRIP TO DRILL COLLARS, HOLE IN GOOD CONDITION. DRILL AND SURVEY 13 1/2" OPEN HOLE FROM 1118' TO 1590', NOT ABLE TO BUILD HOLE ANGLE AS REQUIRED TO STAY ON LINE. CURRENTLY 6 DEG. BEHIND LINE. CIRC BTTMS UP, BLOW DOWN AND STAND BACK KELLY. POH, CHANGE BIT AND MOTOR, LAY DOWN 7 3/4" MUD MOTOR, P/U 9 5/8" MMUD MOTOR, SURFACE TEST AND ORIENT SAME, RIH TO 1590' DRILL AND SURVEY 13 1/2" OPEN HOLE FROM 1590 - 2515'. DIRECTIONAL PROBLEMS, ABLE TO MAINTAIN BUILD RATE. RIH W/ 10 3/4" CSG MW: 0.0 VIS: 0 DRILL AND SURVEY 13 1/2" OPEN HOLE F/ 2515 - 3290' NO DIRECTIONAL PROBLEMS, MAINTAIN BUILD RATED OF 2.5 DEG TO 3 DEG. CIRC BTTMS UP, OBSERVE WELL, STABLE. SHORT TRIP TO HWDP. EXCESS DRAG IN SPOTS APPEARS BIT BALLED UP, TRIP BACK TO BTM, OK. CIRC BTMS UP, MIX AND PUMP HI/LOW VIS SWEEP TO CLEAN HOLE, OBSERVE WELL, OK. POH, LAY DOWN BHA AND BIT. R/U NCS, P/U AND RIH WITH FLOAT SHOE AND FLOAT COLLAR, RIH WITH 10 3/4" CASING. P/U BHA MW: 0.0 VIS: 0 RIH WITH 10 3/4" CSG, EXCESSIVE DRAG IN HOLE FROM JT #50 TO LAST JT. M/U 10 3/4" HGR AND LANDING JT, LAND CSG. CIRC 1.5 X ANNULUS VOL. PUMP 10 BBLS H20, TEST LINES. TOP JOB WITH COLD SET 2 CMT. R/D CEMENTERS. LAY DOWN LANDING JT. PULL MOUSE HOLE, N/D FLOWLINE AND 20" DRLG NIPPLE. CLEAR FLOOR OF CSG TOOLS, LAY DOWN 20" RISER. N/D 20" HYDRIL AND DIVERTER LINE. M/U SPLIT SPEED HEAD AND TEST. N/U BOP STACK, DRLG NIPPLE. N/U FLOW LINE, INSTALL FLANGES FOR CHOKE HOSE AND KILL LINE, OPEN RAM DOORS, CHECK RAM SIZES, CHANGE TOP RAMS TO 5", HOOK UP CHOKE LINE, INSTALL MOUSE HOLE, P/U TEST JT, SET TEST PLUG. TEST BOPE, HI/LOW PRESSURE TEST, TEST FLOOR VALVES AND KELLY. STAND BACK KELLY, PULL TEST PLUG, INSTALL WEAR RING. M/U 9 7/8" BIT AND P/U BHA AND 7 3/4" MUD MOTOR WITH 1-1/4 DEG BH. WELL : X-30 OPERATION: RIG : NABORS 18E PAGE: 3 04/16/95 ( 8) TD: 5150' (1860) 04/17/95 ( 9) TD: 6249' (1099) 04/18/95 (10) TD: 7170' ( 921) 04/19/95 (11) TD: 8243'(1073) 04/20/95 (12) TD: 9200' ( 957) DRILLING MW: 0.0 VIS: 0 M/U BHA, ORIENT MUD MOTOR, TEST MWD TOOL, RIH TO HWDP. SLIP AND CUT DRLG LINE. RIH, LAY DOWN 2 JTS DRILL PIPE, KELLY UP, WASH TO TOP OF FLOAT COLLAR. CLOSE TOP RAMS TO TEST CSG, PRESSURE TO 1300, PRESSURE CAME UP FAST, STOP PUMPING, BLEED OFF PRESSURE, OPEN RAMS TO CIRC PIPE PRESSURE WAS TRAPPED ON DRILL PIPE ANNULUS SIDE AND WHEN RAMS WERE OPENED THE RELEASED PRESSURE REMOVED RAM RUBBER FROM RAM BLOCK OPEN DOORS ON STACK, INSPECT AND REPLACE ELEMENT ON RAM BLOCK, CLOSE DOORS. TEST 10 3/4" CSG, OK. DRILL CMT, FLOAT EQP, AND 10' NEW 9 7/8" OPEN HOLE TO 3300'. CIRC AND COND MUD. PERFORM FIT TEST. DRILL AND SURVEY 9 7/8" OPEN HOLE FROM 3300 - 4301' CIRC. SHORT TRIP TO 10 3/4" CSG SHOE, NO HOLE PROBLEMS. DRILL AND SURVEY 9 7/8" OPEN HOLE F/ 4301 - 5150' M/U BHA, RIH MW: 0.0 VIS: 0 DRILL AND SURVEY 9 7/8" OPEN HOLE FROM 5150 - 5316', OBSERVE WELL, OK. SHORT TRIP 12 ~TDS TO 4166', NO HOLE PROBLEMS. DRILL AND SURVEY 9 7/8 OPEN HOLE FROM 5316 - 6249', PR SLOWED DOWN. CIRC BTTMS UP. OBSERVE WELL, PUMP PILL, POH, LAY DOWN MWD, STAB AND B/O BIT. M/U TEST JT, PULL WEAR RING, SET TEST PLUG, TEST TOP PIPE RAMS. PULL TEST PLUG, SET WEAR RING, LAY DOWN TEST JT. M/U BHA, P/U A/G STAB, P/U KELLY AND SURFACE TEST A/G STAB, SET BACK KELLY. M/U 9 7/8" HYCALOG PDC BIT, ORIENT MOTOR, M/U AND TEST MWD, RIH. DRILLING MW: 0.0 VIS: 0 RIH WITH 9 7/8" PDC BIT AND ANDERGAUGE STABILIZER. KELLY UP, WASH F/ 6192 - 6249', NO PROBLEMS, HOLE IN GOOD CONDITION. DRILL AND SURVEY 9 7/8" OPEN HOLE F/ 6249 - 6680', HIT HARD STREAK. DRILL THRU HARD STRINGER F/ 6880 - 6684', PR IMPROVED. DRILL AND SURVEY 9 7/8" OPEN HOLE FROM 6684 - 6937', HIT HARD STREAK. DRILL THRU HARD STRINGER FROM 6937 - 6940', PR IMPROVED. DRILL AND SURVEY 9 7/8" OPEN HOLE FROM 6940 - 7170', CURRENT PR +/- 100' FPH. ANDERGAUGE TOOL IN FULL GAUGE POSITION. DRILLING MW: 0.0 VIS: 0 CIRC 15 MIN. SHORT TRIP T/6192. SET AG STAB. DRILLING 9-7/8" HOLE F/7204 T/7394. REPAIR WASH OUT IN STND PIPE MANIFOLD. DRILLING 9-7/8" HOLE F/7394 T/8243. NO PROBLEMS. DRILLING MW: 0.0 VIS: 0 DRLG 9 7/8" HOLE F/ 8243 - 8495'. MADE 14 STD SHORT TRIP TO 7130' HOLE IN GOOD SHAPE. DRLG 9 7/8" HOLE F/ 8495 - 8644' REPAIR CHAIN AND CHAIN GUARD ON #1 PUMP. DRLG 9 7/8" HOLE F/ 8644 - 9200' WELL : X-30 OPERATION: RIG : NABORS 18E PAGE: 4 04/21/95 (13) TD: 9907' ( 707) 04/22/95 (14) TD:10581' ( 674) 04/23/95 (15) TD:ll158' ( 577) 04/24/95 (16) TD:11324' ( 166) 04/25/95 (17) TD:11638' ( 314) RIG REPAIR %1 PUMP MOTOR MW: 0.0 VIS: 0 DRLG 9 7/8" HOLE F/ 9200 - 9814' HARD F/ 9410 - 9814' DRLG W/ REDUCED WOB AND ROTARY. MADE 14 STD SHORT TRIP TO 8450'_ NO PROBLEMS. HOLE IN GOOD SHAPE. DRLG 9 7/8" HOLE F/ 9814 - 9907' STILL IN HARD STREAK. REPLACE BRUSHES IN %1 MUD PUMP TRACTION MOTOR. DRILLING MW: 0.0 VIS: 0 REPLACED BRUSHES IN %1 PUMP MOTOR. DRLG 9 7/8" HOLE F/ 9907 - 10581'. TRIP - MWD FAILURE MW: 0.0 VIS: 0 DRLG 9 7/8" HOLE F/ 10581 - 10620' CHANGE SWAB IN %2 PUMP. DRLG 9 7/8" HOLE F/ 10620 - 11055'. MADE 13 STAND SHORT TRIP TO 9772' HOLE IN GOOD SHAPE. DRLG F/ 11055 - 11158'. MWD FAILURE. CIRC LO-HI VIS SWEEP AROUND. SLUG DP AND BLOW DOWN KELLY. POH FOR MWD. SLM. HOLE IN GOOD SHAPE. DRILLING MW: 0.0 VIS: 0 FINISH POH FOR MWD TOOL. SLM. NO CORRECTION. TIGHT HOLE F/ 6500 - 5800' AND 5000 - 3500' BIT WAS DULL. PULLED WEAR BUSHING AND SET TEST PLUG. TEST BOPE. PULLED TEST PLUG AND SET WEAR BUSHING. LD MWD, SHORT DC'S, ANDER GAGE STABILIZER, AND MUD MOTOR. PU NEW BIT, MOTOR, M~-GR. ORIENT TOOLS AND SURFACE TEST MOTOR AND MWD. RIH. FILL PIPE @ 10 3/4" SHOE AND @ 6994' LD 7 SINGLES DP. BREAK CIRC AND START WASHING TO BTM TO MAD PASS LOG W/ GR-RES. HOLE TIGHT AND PACKING OFF F/ 10911 - 10953' MAD PASS W/ GR-RES LOG F/ 10915 - 11100' HOLE A LITTLE TIGHT ON CONNECTIONS. DRLG 9 7/8" HOLE F/ 11158 - 11324' POH LD DP MW: 0.0 VIS: 0 DRLG 9 7/8" HOLE F/ 11158 - 11542'. CHANGE SWAB IN PUMP %2. DRLG 9 7/8" HOLE F/ 11542 - 11622' CIRC BTTMS UP FOR SAMPLES AND PUMP LOW/HIGH VIS SWEEP AROUND. DRLG 9 7/8" HOLE F/ 11622 - 11633'. CIRC BTTMS UP FOR SAMPLES. PICKED TOP OF SAG RIVER SD @ 11607. PUMPED SLUG. MADE 90 STD TRIP TO 10 3/4" SHOE. RIH. NO PROBLEMS. WASH 43' TO BTM. NO FILL. HOLE IN GOOD SHAPE. DRLG 5' RATHOLE FOR 7 5/8" CSG. CIRC AND COND MUD AND HOLE TO RUN 7 5/8" CSG. PUMP LOW/HIGH VIS SWEEP AROUND. SLUG DP. BLOW DOWN KELLY. POH LD 5" DP. WELL : X-30 OPERATION: RIG : NABORS 18E PAGE: 5 04/26/95 (18) TD:11638' ( 0) 04/27/95 (19) TD:11638' ( 0) 04/28/95 (20) TD:l1715' ( 77) 04/29/95 (21) TD:12100' ( 385) CIRC AND COND MUD MW: 0.0 VIS: 0 POH LD 5" DP, BREAK KELLY. CUT DRLG LINE. LD 5" HWDP AND BHA. PULLED WEAR RING, SET TEST PLUG, CHANGED UPPER RAMS TO 7 5/8". TEST DOOR SEALS, PULLED TEST PLUG. RU CASERS. RAN 281 JTS 7 5/8" 29.7# NT95 NSCC CSG. CIRC AT 10 3/4" SHOE. PU HANGER AND LANDING JT. LANDED CSG. RU CEMENTING HEAD. BREAK CIRC. SLOWLY INCREASING PUMP RATE. HOLE PACKING OFF. PULLLED 450K, UNABLE TO MOVE CSG. CIRC AND COND MUD AND HOLE FOR CEMENT JOB. PUMPING 30 SPM W/ FULL RETURNS. RIH PU 3 1/2" DP MW: 0.0 VIS: 0 CIRC AND COND MUD AND HOLE FOR CEMENT JOB. UNABLE TO MOVE 7 5/8" CSG PULLING 175K OVER STRING WT UNABLE TO INCREASE CIRCULATION ABOVE 7 BPM WITHOUT HOLE PACKING OFF AND PUMPING MUD AWAY. TEST LINES. SET AND CEMENTED 7 5/8" CSG W/ SHOE @ 11627', FC @ 11542' AND RA TAGGED COLLAR @ 11418' PLUG BUMPED. TEST CSG. RELEASED PRESSURE, FLOATS HELD. RD CMT'G HEAD. BACK OUT LANDING JT. INSTALLED 7 5/8" PACKOFF AND TEST. CHANGE UPPER RAMS TO 3 1/2" INSTALLED TEST PLUG. INJECTED 223 BBLS MUD DOWN 10 3/4" X 7 5/8" ANNULUS. TEST BOPE. BLIND SHEAR RAMS LEAKED. REPLACED W/ BLIND RAMS AND TESTED. PULLED TEST PLUG AND SET WEAR RING. RU ATLAS W.L. TRUCK. RAN GYRO F. 11500' TO SURFACE. SERVICE RIG. LD 5" KELLY AND PU 3 1/2" KELLY. TEST UPPER AND LOWER KELLY COCKS. PU 6 3/4" BHA, SURFACE TEST MW-D, RIH PU 3 1/2" DP. DRILLING MW: 0.0 VIS: 0 RIH PU 3 1/2" DP, CIRC AND CHECK MWD EVERY 3000'. CUT DRLG LINE. ADJUST CROWN SAVER AND BRAKES. RIH PU 3 1/2" DP TO 11400' PU AND TORQUE KELLY. WASH F/ 11400 - 11542' MAD PASS ACROSS RA TAGGED COLLAR @ 11417'. BLOW DOWN CHOKE MANIFOLD. DRLG PLUGS AND FC @ 11542', GOOD CMT, F.S. @ 11627' AND CUT MUD WT TO 9.3 PPG. DRLG 10' NEW HOLE TO 11648'_ PU AND OBSERVE WELL FOR F.I.T. TEST. DRLG 6 3/4" HOLE F/ 11648 - 11715' RUNNING O.H. LOGS MW: 0.0 VIS: 0 DRLG 6 3/4" PILOT HOLE F/ 11715 - 12100' CIRC FOR SHORT TRIP. MADE 5 STAND SHORT TRIP. HOLE IN GOOD SHAPE. CIRC SWEEP AROUND. CONDITION MUD AND HOLE FOR O.H. LOGS. POH FOR LOGS. LD BHA. SLM, NO CORRECTION. RU ATLAS WL. RIH W/ DIL/GR/SONIC/NEUTRON/DENSITY TO 4000', SONIC NOT WORKING. POH AND CHANGE PCM. RIH TO 5000' TOOL NOT WORKING. POH AND REPLACE SAME. WELL : X-30 OPERATION: RIG : NABORS 18E PAGE: 6 04/30/95 (22) TD:12100' ( 0) 05/01/95 (23) TD:12100' ( 0) 05/02/95 (24) TD:12100' ( 0) 05/03/95 (25) TD:l1704' ( 0) RU TO POH W/ WL AND FISH MW: 0.0 VIS: 0 RIH W/ DIL/GR/SONIC/NEUTRON/DENSITY. WLTD 12086' GOT A TOOL PU WT SET BACK ON BTM AND OPENED CALIPER. TOOLS STUCK ON BTM. PULLED 6000 OVER TOOL AND WL WT AND ATTEMPT TO WORK FREE. NO MOVEMENT. TOP OF FISH @ 11988' WL DEPTH. CLAMP OFF AND CUT WL, RU TO STRIP OVER WL. PU 5 3/4" OS W/ 3 3/8 GRAPPLE, 2-EXT, BUMPER SUB, JARS, CIRC SUB. RIH W/ 3 1/2" DP STRIPPING OVER WL. CIRC BTMS UP @ SHOE. ATTEMPT TO WORK GRAPPLE OVERFISH @ 11988' NO LATCH UP. PUMP THRU OVERSHOT. UNABLE TO CATCH FISH. PU SIDE DOOR ENTRY SUB. WASH DOWN OVER FISH AND ENGAGED OVER SHOT. WORKED PIPE PULLING MAX OVERPULL IN 5000# INCREMENTS UNTIL FISH PULLED FREE. SHEAR CIRC SUB. SLUG DP. CIRC AND COND MW: 0.0 VIS: 0 POH W/ FISH CUTTING W.L. EVERY STAND. LD CIRC SUB, JARS, BUMPER SUB. PULLED FISH UP AND DOWN LOAD RA SOURCE FORM LOGGING TOOL. LD OVERSHOT. LD FISH. RECOVERED ALL LOGGING TOOLS. PU BHA AND RIH TO FOR WIPER TRIP. WASHED 70' TO BOTTOM. NO FILL. HOLE IN GOOD SHAPE. CIRC AND COND MUD AND HOLE FOR O.H. LOGS. POH MW: 0.0 VIS: 0 CIRC AND CONDITION MUD AND HOLE FOR O.H. LOGS. SHORT TRIP TO 7 5/8" SHOE. HOLE IN GOOD SHAPE. CIRC AND CONDITION MUD FOR O.H. LOGS. PUMPED HIGH VIS SWEEP AROUND. POH FOR LOGS. LD BHA. RU ATLAS. RAN DIL/BHC SONIC/GR F/ 12042 - 11627' AND PULLED GR TO 10800' ONE TIGHT SPOT, PULLED 2000# OVER @ 12000'. POH RD ATLAS. RIH W/ OPEN ENDED DP TO 12100' TO SPOT KICKOFF PLUG. CIRC AND CONDITION MUD. BATCH MIX CEMENT. TEST LINES. BJ SPOTTED BALANCED PLUG IN 6 3/4" OPEN HOLE AND 7 5/8" CSG F/ 12100- 11261', 205 SX CL 'G' W/ ADDITIVES, 36 BBLS SLURRY. PULLED OUT OF CEMENT SLOW. PULLED TOTAL 16 STANDS. STUFF DP WIPER PLUG AND CIRC BTTMS TO CLEAN OUT DP. ?OH W/ DP AND MULE SHOE SUB. CUT DRLG LINE. POH W. MULE SHOE SUB. CLEAN PITS MW: 0.0 VIS: 0 POH W/ 3 1/2" DP AND MULE SHOE SUB. TEST BOPS. NO LEAKS. PU BHA, ORIENT TOOLS, AND SURFACE TEST MWD. RIH TO DRESS OFF CMT PLUG. FILLED EVERY 3000'. PU KELLY AND TEST UPPER AND LOWER KELLY COCKS. RIH TO 11310' WASH F/ 11310' TO TOP OF CMT @ 11370'. DRLG CMT F/ 113~0 - 11631'. DRLG OFF CMT PLUG F/ 11631 - 11704'_ PULLED UP INTO 7 5/8" CSG. PREPARE TO DISPLACE HOLE W/ FLOPRO MUD SYSTEM. CLEANING PITS. OCT i 9 !995 ^ a~.~ Oil .& Gas Cor~$. C;orm~'lis$ion ~mchomg~ WELL : X-30 OPERATION: RIG : NABORS 18E PAGE: 7 05/04/95 (26) TD:11975' ( 271) 05/05/95 (27) TD:12190' ( 215) 05/06/95 (28) TD:12980' ( 790) 05/07/95 (29) TD:12980' ( 0) CIRC AND COND MUD MW: 0.0 VIS: 0 PUMP 50 BBL DIRT MAGNET, 75 BBL HI VIS SWEEP FOLLOWED BY 8.9 PPG FLO-PRO DRILLING FLUID. DRILL 6 3/4" HOLE F/ 11704 - 11975' GOT ANGLE AND AZIMUTH. ROP SADLEROCHIT 9005' o TVD - 11909' MD. OBSERVED GAS CUT MUD WITH WEIGHT CUT FROM 9.0 TO 8.5 PPG AT SHAKER. CIRC AND RAISE MW TO 9.3 PPG OVER 2 CIRCULATIONS. WORKING STUCK PIPE MW: 0.0 VIS: 0 RAISE MW TO 9.3 + PPG. PULL 5 STANDS INTO SHOE. RIH. NO PROBLEMS. HOLE TOOK FLUID. CBU. HAD GAS ON BOTTOMS UP BUT NOT SEVERE. POH SLOW, 2 MIN/STD. HOLE FILL CORRECT. CLEAR ICE FROM DERRICK. POH. L/D MWD PROBE AND MOTOR. M/U BIT #8, 1 1/4 DEG MOTOR, STABILIZER, NEW MWD PROBE. SURFACE TEST AND ORIENT, OK. RIH SLOW. SMALL BRIDGE AT 11825' DRILL AHEAD TO 12190' GOT STUCK ON BTM WHILE SLIDING. WORK STUCK PIPE. MECH JARS HITTING BUT HYDRAULICS ARE NOT. TORQUE AND SLUMP PIPE. HAVE FULL CIRC. SUSPECT DIFFERENTIALLY STUCK AT MWD COLLAR. DRILLING MW: 0.0 VIS: 0 DRILL AHEAD TO 12789' BIT HAS 20 HRS ON BTM ROTATING AND 300' TO DRILL. PUMP SWEEP. CBU. POH SLOWLY TO MINIMISE SWABBING. BREAK OFF BIT. CLEAR FLOOR. M/U BIT #9. RIH FILL EVERY 25 STDS. WORK THRU TIGHT SPOT 12400 - 12470' -- RIH. WASH 12476' TO BTM. NO FILL. DRILL AHEAD TO 12980' DRILLING CIRC AND CONDITION MUD. MW: 0.0 VIS: 0 05/08/95 (30) TD:13043' ( 63) 05/09/95 (31) TD:13043' ( 0) CLEANOUT TRIP MW: 0.0 VIS: 0 DRILL TO 13012' CIRC UP SAMPLE FOR GEOLOGIST. DRILL TO TD AT 13043'. CIRC AND CLEAN HOLE. SHORT TRIP TO SHOE, OK. PUMP SWEEP. GAS CUT MUD ON BTTMS UP. POH SLOWLY. L/D SINGLES FOR REAMING. L/D BHA AND BIT. P/U HOLE OPENER AND SCRAPER. RIH TO SHOE. CLEAN OUT OPEN HOLE TO 12000'. RUNNING 5-1/2" LINER MW: 0.0 VIS: 0 CON'T WASHING & REAMING OPEN HOLE W/HOLE OPENER T/TD. CIRC SWEEP AROUND. SHORT TRIP T/SHOE. RIH. NO PROBLEMS. HOLE CONDITION IS GOOD. CIRC SWEEP AROUND. MUD GAS CUT 1 PPG ON BU. CIRC T/BREAK GAS OUT OF MUD. DROP 2" RABBIT. POOH F/5-1/2" LINER. SLM. L/D SCRAPER & HOLE OPENER. SERVICE THE WEAR RING. RU CASG TOOLS. HOLE PRE-JOB SFTY MTG. RUN 5-1/2" LINER. WELL · X-30 OPERATION: RIG ' NABORS 18E PAGE: 8 05/10/95 (32) TD:13043' ( 0) 05/11/95 (33) TD:13043' ( 0) 05/12/95 (34) TD:13043 PB:12955 05/13/95 (35) TD:13043 PB:12955 TEST BOPE MW: 0.0 VIS: 0 P/U 39 JTS 5 1/2" LINER. M/U HANGER. CIRC LINER COL. RIH WITH LINER ON 3 1/2" DP. BREAK CIRC AT 7100'. CIRC ANN VOL TO BREAK GELS IN MUD. CONTINUE RIH WITH LINER TO 7 5/8" SHOE. CIRC ANNULUS VOL. M/U CMT HEAD ON SINGLE. RIH TO BOTTOM. NO FILL. CIRC 3 ANN VOL. COULD NO RECIPROCATE PIPE WITHOUT REDUCING FLOWRATE. LINER WOUL NOT GO DOWN AT HIGHER RATE. START BATCH MIXING CMT. TEST LINES. PUMP 20 BBL WATER W/ 2 % KCL, 70 BBL MCS-4 SPACER W/ KCL @ 10.2 PPG FOLLOWED BY 39 BBL CLASS G LIQUID LATEX SLURRY @ 15.7 PPG. KICK OUT DART WITH 5 BBL WATER AND DISPLACE WITH MUD. SAW LINER WIPER PLUG SHEAR. BUMP PLUG AT CALC DISP. SET HANGER AND RELEASE FROM SAME, OK. POH 10 STANDS. CIRC D/P VOL SLOW TO CLEAR PIPE OF CMT. L/D TIW RUNNING TOOL. PULL BORE PROTECTOR. INSTALL TEST PLUG. INSTALL BLIND/SHEAR RAMS IN MIDDLE CAVITY. TEST BOPE. RIH TO C/OUT 5 1/2" LINER MW: 0.0 VIS: 0 TEST BOPE, ANNULAR. BLIND/SHEAR RAMS WOULD NOT TEST. CHANGE BACK TO BLIND RAMS. TESTED OK. PULL TEST PLUG. INSTALL WEAR RING. P/U 6 3/4" BIT, 7 5/8" CSG SCRAPER, RIH. CUT 105' DRILLING LINE. RIH. TAG CEMENT AT 11273' L/D PIPE TO CLEANOUT TO TOL. DISPLACE MUD TO SEAWATER. CLEAN OUT CMT FROM 11273' TO TOL AT 11482' CBU. PUMP VIS SWEEP. TEST LINER LAP, OK. PUMP PILL. POH. LD BHA. M/U 4 3/4" ECONOMILL. PU 3 1/2" D/C, 2 7/8" PAC WORKSTRING. RIH TO CLEAN OUT INSIDE 5 1/2" LINER. RIH W/ DP CONV PERF GUNS MW: 0.0 RIH W/ 4 3/4" ECONOMILL. CLEAN OUT CEMENT STRINGERS IN LINER TOP 11482 - 11530' RIH TO LANDING COLLAR @ 12955' CBU. TEST LINER. PUMP ~0 BBL DIRT MAGNET AND 100 BBL XANVIS SWEEP. DISPLACE WELL TO CLEAN SEAWATER. ROTATE AND RECIPROCATE PIPE. TEST CASING, OK. BLEED OFF TO ZERO. POH. LD 26 JTS 2 7/8" PAC, 3 1/2" DC'S AND ECONOMILL. PU PERF GUNS AND TOOLSTRING. RIH WITH GUNS ON 3 1/2" HW AND DP. 65 STDS IN AT REPORT TIME. LD DP CONVEYED PERF GUNS MW: 0.0 RIH WITH PERF GUNS. TAG L/C, PU AND SPACE OUT. MU FLOW HEAD. SET PKR. RU LINES AND TEST SAME. PRESSURE ANNULUS AND FIRE FUNS, OK. OPEN BYPASS AND REV CIRC 2 X DP VOL. OPEN ANNULAR AND FILL HOLE. CIRC WELL. SAW SMALL AMT OF GUN DEVRIS ON BTTMS UP. POH LDDP FOR TUBING. LD TOOL STRING AND PERF GUNS. WELL : X-30 OPERATION: RIG : NABORS 18E PAGE: 9 05/14/95 (36) TD:13043 PB:12955 05/15/95 (37) TD:13043 PB:12955 BLEED TBG PRESSURE MW: 0.0 FINISH LD PERF GUNS. CHANGE TOP PIPE RAMS TO 4 1/2". TEST DOOR SEALS, OK. RU TUBING TONGS AND ELEVATORS. RUN 271 JTS 4 1/2" L-80 NSCT TUBING, PKR/TAIL PIPE ASSY AND 6 GLM'S. MU BVLN. HOOK UP AND TEST CTRL LINES. SPACE OUT TUBING MU HANGER. REVERSE CIRC ANNULUS TO INHIBITED BRINE WHILE CONNECTING CTRL LINES TO HANGER AND TESTING SAME, OK. LAND TUBING HANGER. RILDS. DROP SETTING BALL. SET PACKER. HOLD PRESSURE TO TEST TBG, OK. BLEED TBG PRESSURE. PRESSURE ANNULUS. BLEED OFF TO ZERO. RELEASE RIG MW: 0.0 BACK OUT LANDING JT. INSTALL TWC VALVE AND TEST SAME. ND BOPE. INSTALL TUBING HEAD ADAPTOR AND XMAS TREE. TEST, OK. RU LUBRICATOR. PULL TWC. SHEAR RP VALVE. PUMP 85 BBL DIESEL INTO INNER ANNULUS. U TUBE DIESEL INTO TBG TO FREEZE PROTECT TBG AND INNER ANNULUS TO 2200' INSTALL BPV IN TBG HGR AND SECURE TREE. INJECT EXCESS FLUID FROM PITS. CLEAN OUT CELLAR. RELEASE RIG @ 1800 HRS ON 05/14/95. SIGNATURE: (drilling superintendent) DATE: X-30 PH 'gnchora~le BP EXPLORATION (Alaska) Inc. Pad X 30PH slot #30 Prudhoe Bay North Slope, Alaska SURVEY LISTING by Baker Hughes INTEQ Your ref : NAVI <11568-12100'> Our ref : svy4618 License : Date printed : 1-Aug-95 Date created : 18-May-95 Last revised : 20-Jun-95 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on nTO 14 33.605,w148 39 36.642 Slot location is n70 14 28.121,w148 40 2.053 Slot Grid coordinates are N 5939552.560, E 665021.955 Slot local coordinates are 557.55 S 874.14 Reference North is True North BP EXPLORAT[ON (ALaska) [nc. Pad X,3OPH Prudhoe Bay,North SLope, ALaska Measured Inc[in. Azimuth Depth Degrees Degrees 0.00 0.00 0.00 200.00 0.40 234.60 292.00 0.90 235.00 385.00 0.40 256.10 476.00 0.40 282.80 567.00 0.40 249.00 659.00 0.30 187.20 754.00 0.90 149.20 850.00 1.80 147.40 945.00 2.60 162.20 1038.00 4.20 156.20 1133.00 4.90 152.00 1228.00 5.30 160.40 1323.00 5.50 157.60 1417.00 6.20 160.80 1510.00 6.00 166.40 1601.00 7.40 172.40 1696.00 8.90 173.10 1792.00 11.30 175.60 1889.00 13.30 177.70 1982.00 13.70 177.30 2077.00 15.40 174.80 2173.00 18.40 174.50 2268.00 20.60 175.20 2364.00 22.70 177.30 2460.00 25.30 178.70 2553.00 27.60 179.40 2648.00 29.50 176.60 2741.00 31.70 176.30 2833.00 34.50 176.30 2926.00 37.40 175.90 3019.00 40.30 176.30 3112.00 42.00 174.10 3205.00 43.90 172.00 3320.00 44.80 167.50 3414.00 44.60 167.80 3506.00 44.60 168.20 3598.00 44.50 168.50 3690,00 44.50 166.80 3783.00 44.30 167.50 3874.00 44.30 166.10 3967.00 44.50 166.10 4058.00 46.80 169.90 4149.00 46.40 171.70 4241.00 46.30 172.00 4333.00 46.50 171.30 4426.00 46.50 170.60 4518.00 47.10 169.90 4610.00 47.60 170.30 4700.00 46.50 172.40 SURVEY LISTING Page 1 yoUr ref : NAV! <11568-12100'> Last revised : 20-Jun-95 True Vert. R E C T A N 6 U L A R Dogleg Vert Depth C 0 0 R D ! N A T E S Deg/lOOFt Sect 0.00 0.00 N 0.00 E 0.00 0.00 200.00 0.40 S 0.57 W 0.20 0.49 291.99 1.00 S 1.42 W 0.54 1.21 384.98 1.50 S 2.34 ~ 0.59 1.84 475.98 1.51 S 2.95 ~ 0.20 1.94 566.98 1.55 S 3.56 14 0.26 2.07 658.98 1.90 S 3.89 14 0.40 2.47 753.97 2.~'9 S 3.54 14 0.72 3.30 849.95 4.71 S 2.34 14 0.94 5.01 944.88 8.02 S 0.88 14 1.03 8.06 1037.71 13.14 S 1.14 E 1.76 12.82 1132.41 19.91 S 4.45 E 0.82 19.00 1227.04 27.62 S 7.82 E 0.89 26.12 1321.61 35.97 S 11.03 E 0.35 33.87 1415.12 44.93 S 14.42 E 0.82 42.21 1507.60 54.39 S 17.21 E 0.67 51.15 1597.98 64.82 S 19.11 E 1.72 61.17 1692.01 78.18 S 20.80 E 1.58 74.12 1786.52 94.94 S 22.41 E 2.54 90.43 1881.29 115.56 S 23.59 E 2.11 110.64 1971.72 137.25 S 24.54 E 0.44 131.93 2063.67 161.06 S 26.21 E 1.91 155.20 2155.51 188.84 S 28.82 E 3.13 182.26 2245.06 220.42 S 31.66 E 2.33 213.05 2334.28 255.76 S 33.94 E 2.33 247.63 2421.98 294.77 S 35.28 E 2.77 285.99 2505.24 336.19 S 35.96 E 2.50 326.82 2588.68 381.55 S 37.57 E 2.44 371.41 2668.73 428.80 S 40.51 E 2.37 417.66 2745.79 478.93 S 43.75 E 3.04 466.72 2821.07 533.39 S 47.47 E 3.13 519.99 2893.49 591.59 S 51.43 E 3.13 576.90 2963.52 652.56 S 56.57 E 2.40 636.39 3031.59 715.45 S 64.26 E 2.56 697.38 3113.84 794.51 S 78.58 E 2.84 773.34 3180.66 859.10 S 92.72 E 0.31 835.03 3246.17 922.28 S 106.15 E 0.30 895.44 3311.73 985.49 S 119.18 E 0.25 955.94 3377.35 1048.48 S 132.98 E 1.30 1016.10 3443.80 1111.92 S 147.45 E 0.57 1076.60 3508.93 1173.79 S 161.96 E 1.07 1135.55 3575.37 1236.96 S 177.59 E 0.22 1195.61 3638.99 1300.59 S 191.07 E 3.91 1256.45 3701.52 1365.85 S 201.65 E 1.50 1319.35 3765.02 1431.74 S 211.08 E 0.26 1383.04 3828.47 1497.66 S 220.76 E 0.59 1446.73 3892.49 1564.28 S 231.37 E 0.54 1510.96 3955.46 1630.38 S 242.73 E 0.86 1574.56 4017.80 1697.04 S 254.36 E 0.63 1638.68 4079.12 1762.15 S 264.28 E 2.10 1701.53 ALl data is in feet unless otherwise stated Coordinates from slot #30 and TVD from RKB for Nabors 18E (70.10 Ft above mean sea level). Vertical section is from wellhead on azimuth 188.74 degrees. Declination is 0.00 degreesv Convergence is 1.26 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes [NTEQ BP EXPLORAT[ON (Ataska) [nc. Pad X,3OPH Prudhoe Bay,North Stope, Ataska Measured [nclin. Azimuth True Vert. Depth Degrees Degrees Depth SURVEY LIST[NG Page 2 yoUr ref : NAV! <11568-12100'> Last revised : 20-'Jun-95 R E C T A N G U L A R Dogleg Vert C 0 0 R D ! N A T E S Deg/lOOFt Sect 4794.00 45.60 174.80 4144.36 1829.39 4887.00 46.20 174.10 4209.08 1895.86 4979.00 46.80 174.70 4272.41 1962.28 5071.00 45.60 174.80 4336.09 2028.40 5164.00 45.40 174.80 4401.27 2094.46 S 271.83 E 2.07 1766.84 S 278.30 E 0.84 1831.56 S 284.80 E 0.80 1896.22 S 290.88 E 1.31 1960.65 S 296.89 E 0.22 2025.03 5256.00 45.60 174.80 4465.76 2159.81 5347.00 46.10 174.80 4529.14 2224..84 5438.00 46.10 175.20 4592.24 2290.16 5530.00 45.30 174.80 4656.50 2355.75 5623.00 45.10 174.50 4722.03 2421.45 S 302.84 E 0.22 2088.71 S 308.76 E 0.55 2152.08 S 314.47 E 0.32 2215.78 S 320.21 E 0.92 2279.74 S 326.36 E 0.31 2343.74 5718.00 44.90 173.80 4789.20 2488.28 5812.00 45.60 174.10 4855.38 2554.66 5906.00 45.60 174.10 4921.15 2621.46 6000.00 46.40 174.10 4986.44 2688.72 6095.00 44.60 173.40 5053.03 2756.08 S 333.21 E 0.56 2408.75 S 340.24 E 0.78 2473.30 S 347.15 E 0.00 2538.28 $ 354.10 E 0.85 2603.70 S 361.47 E 1.97 2669.15 6189.00 43.30 172.40 5120.70 2820.81 6284.00 43.40 170.60 5189.79 2885.30 6376.00 43.50 172.00 5256.58 2947.84 6470.00 43.40 171.70 5324.82 3011.84 6564.00 43.20 172.00 5393.23 3075.65 S 369.52 E 1.57 2731.91 S 379.16 E 1.30 2794.19 S 388.73 E 1.05 2854.54 S 397.90 E 0.24 2916.40 S 407.04 E 0.30 2978.09 6658.00 43.30 171.00 5461.70 3139.35 6752.00 43.30 171.70 5530.11 3203.08 6847.00 43.60 171.00 5599.08 3267.67 6942.00 43.80 170.30 5667.76 3332.43 7035.00 43.90 170.30 5734.83 3395.94 S 416.56 E 0.74 3039.60 S 426.25 E 0.51 3101.12 S 436.08 E 0.60 3163.47 S 446.74 E 0.55 3225.85 S 457.60 E 0.11 3286.97 7129.00 44.00 170.30 5802.50 3460.25 7224.00 44.10 169.90 5870.78 3525.31 7319.00 44.20 169.60 5938.95 3590.43 7413.00 44.30 170.30 6006.28 3655.01 7507.00 44.50 169.60 6073.44 3719.77 S 468.59 E 0.11 3348.86 S 479.95 E 0.31 3411.45 S 491.72 E 0.24 3474.02 S 503.17 E 0.53 3536.12 S 514.64 E 0.56 3598.38 7602.00 44.20 170.60 6141.37 3785.19 S 526.06 E 0.80 3661.30 7697.00 44.20 170.60 6209.48 3850.53 S 536.88 E 0.00 3724.24 7793.00 44.20 170.30 6278.30 3916.53 S 547.98 E 0.22 3787.79 7888.00 44.10 170.30 6346.47 3981.76 S 559.13 E 0.10 3850.56 7983.00 44.20 170.30 6414.63 4046.98 S 570.28 E 0.10 3913.33 8077.00 44.10 169.90 6482.08 4111.48 S 581.54 E 0.31 3975.37 8171.00 44.20 168.90 6549.53 4175.84 $ 593.58 E 0.75 4037.15 8264.00 44.20 169.20 6616.20 4239.49 S 605.90 E 0.22 4098.20 8357.00 42.90 170.60 6683.60 4302.57 S 617.14 E 1.74 4158.83 8451.00 42.80 171.30 6752.52 4365.70 S 627.20 E 0.52 4219.70 8545.00 42.70 171.30 6821.54 4428.77 S 636.85 E 0.11 4280.58 8638.00 42.60 172.40 6889.95 4491.14 S 645.78 E 0.81 4340.87 8733.00 42.50 171.30 6959.93 4554.74 S 654.89 E 0.79 4402.34 8828.00 42.50 171.30 7029.98 4618.18 S 664.60 E 0.00 4463.57 8922.00 42.40 170.20 7099.34 4680.80 S 674.80 E 0.80 4523.91 9017.00 42.40 172.40 7169.49 4744.11 $ 684.49 E 1.56 4585.01 9113.00 42.30 171.70 7240.44 4808.16 S 693.43 E 0.50 4646.96 9206.00 42.10 171.00 7309.34 4869.92 S 702.82 E 0.55 4706.57 9301.00 41.70 171.70- 7380.05 4932.64 S 712.37 E 0.65 4767.12 9394.00 41.70 171.70 7449.48 4993.86 S 721.30 E 0.00 4826.27 All data is in feet unless otherwise stated Coordinates fro~ slot ~30 and TVD from RKB for Nabors 18E (70.10 Ft above mean sea [eve[). Vertical section is from wellhead on azimuth 188.74 degrees. Declination is 0.00 degrees, Convergence is 1.26 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (Alaska) inc. Pad X,3OPH Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 3 Your ref : NAVI <11568-12100'> Last revised : 20-Jun-95 Measured Inc[in. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 9488.00 41.40 171.00 7519.83 5055.50 S 730.67 E 0.59 4885.76 9584.00 41.00 171.70 7592.06 5118.01 S 740.19 E 0.64 4946.11 9677.00 40.60 172.00 7662.46 5178.16 S 748.80 E 0.48 5004.25 9770.00 40.80 171.70 7732.97 5238.20 S 757.40 E 0.30 5062.28 9861.00 40.60 170.60 7801.96 5296.83 S 766.53 E 0.82 5118.85 9955.0C 40.50 170.60 7873.39 5357.12 S 776.51 E 0.11 5176.92 10046.00 40.40 171.70 7942.64 5415.~5 $ 785.59 E 0.79 5233.20 10141.00 40.30 171.30 8015.04 5476.28 S 794.68 E 0.29 5291.94 10235.00 40.10 171.70 8086.83 5536.29 S 803.65 E 0.35 5349.89 10327.00 41.70 175.90 8156.38 5596.15 S 810.12 E 3.46 5408.07 10421.00 43.90 176.30 8225.35 5659.86 S 814.46 E 2.36 5470.38 10514.00 45.80 178.40 8291.28 5725.37 S 817.47 E 2.59 5534.68 10605.00 47.50 178.40 8353.75 5791.52 $ 819.32 E 1.87 5599.~ 10698.00 49.70 181.50 8415.25 5861.26 S 819.34 E 3.44 5668.70 10792.00 51.80 183.30 8474.73 5933.98 S 816.28 E 2.68 5741.04 10887.00 54.00 184.30 8532.03 6009.57 S 811.25 E 2.46 5816.52 10980.00 56.10 185.30 8585.30 6085.53 S 804.86 E 2.42 5892.56 11073.00 57.60 187.20 8636.16 6162.92 S 796.38 E 2.35 5970.35 11165.00 57.50 188.20 8685.53 6239.85 S 785.98 E 0.92 6047.97 11260.00 57.80 187.90 8736.36 6319.32 S 774.74 E 0.41 6128.22 11354.00 59.20 189.60 8785.48 6398.52 S 762.54 E 2.14 6208.36 11447.00 59.80 189.60 8832.68 6477.53 S 749.17 E 0.64 6288.48 11538.00 60.00 189.30 8878.32 6555.19 S 736.25 E 0.36 6367.20 11568.00 59.60 190.30 8893.40 6580.74 S 731.83 E 3.17 6393.12 11680.00 59.10 190.00 8950.50 6675.59 S 714.85 E 0.50 6489.45 11776.00 57.40 189.30 9001.02 6756.06 S 701.16 E 1.88 11871.00 54.90 188.20 9053.93 6834.03 $ 689.15 E 2.80 11966.00 54.50 188.20 9108.83 6910.77 S 678.10 E 0.42 12050.00 53.70 187.50 9158.08 6978.18 S 668.80 E 1.17 12100.00 53.70 187.50 9187.68 7018.13 S 663.54 E 0.00 6571.07 6649.96 6727.49 6795.52 6835.81 Projected to TD N~,_I¢, 0il .& Gas Cons. Co~f~u~issior~ ;&ncl~orafle Alt data is in feet unless otherwise stated Coordinates from slot #30 and TVD from RKB for Nabors 18E (70.10 Ft above mean sea level). Vertical section is from wellhead on azimuth 188.74 degrees. Declination is 0.00 degrees~ Convergence is 1.26 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (ALaska) Inc. Pad X,3OPH Prudhoe Bay,North SLope, Alaska SURVEY LISTING Page 4 yoUr ref : NAV! <11568-12100'> Last revised : 20-Jun-95 Comnents in wetlpath MD TVD Rectangular Coords. 12100.00 9187.68 7018.13 S 663.54 E Projected to TD All data fs in feet unless otherwise stated Coordinates from slot #30 and TVD from RKB for Nabors 18E (70.10 Ft above mean sea level). Bottom hole distance is 7049.42 on azimuth 174.60 degrees from wellhead. Vertical section is from wellhead on azimuth 188.74 degrees. Declination is 0.00 degrees, Convergence is 1.26 degrees. Calculation uses the minim[~ curvature method. Presented by Baker Hughes iNTEQ X-30 BP EXPLORATION (Alaska) Inc. Pad X 3O slot #30 Prudhoe Bay North Slope, Alaska SURVEY LISTING by Baker Hughes INTEQ Your ref : NAVI <11627-12988'> Our ref : svy4617 License : Date printed : 1-Aug-95 Date created : 18-May-95 Last revised : 20-Jun-95 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on n70 14 33.605,w148 39 36.642 Slot location is nTO 14 28.121,w148 40 2.053 Slot Grid coordinates are N 5939552.560, E 665021.955 Slot local coordinates are 557.55 S 874.14 W Reference North is True North Alaska Oil & Gas Cons. Cor~r~lission Ar~chorage BP EXPLORATION (Alaska) Inc. SURVEY LISTING Page 1 Pad X,30 Your ref : NAVI <11627-12988'> Prudhoe Bay, North Slope, Alaska Last revised : 20-Jun-95 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 200.00 0.40 234.60 200.00 0.40 S 0.57 W 0.20 0.49 292.00 0.90 235.00 291.99 1.00 S 1.42 W 0.54 1.21 385.00 0.40 256.10 384.98 1.50 S 2.34 W 0.59 1.84 476.00 0.40 282.80 475.98 1.51 S 2.95 W 0.20 1.94 567.00 0.40 249.00 566.98 1.55 S 3.56 ~ 0.26 2.07 659.00 0.30 187.20 658.98 1.90 S 3.89 ~ 0.40 2.47 754.00 0.90 149.20 753.97 2.79 S 3.54 ~ 0.72 3.30 850.00 1.80 147.40 849.95 4.71 S 2.34 W 0.94 5.01 945.00 2.60 162.20 944.88 8.02 S 0.88 W 1.03 8.06 1038.00 4.20 156.20 1037.71 13.14 S 1.14 E 1.76 12.82 1133.00 4.90 152.00 1132.41 19.91 S 4.45 E 0.82 19.00 1228.00 5.30 160.40 1227.04 27.62 S 7.82 E 0.89 26.12 1323.00 5.50 157.60 1321.61 35.97 S 11.03 E 0.35 33.87 1417.00 6.20 160.80 1415.12 44.93 S 14.42 E 0.82 42.21 1510.00 6.00 166.40 1507.60 54.39 S 17.21 E 0.67 51.15 1601.00 7.40 172.40 1597.98 64.82 S 19.11 E 1.72 61.17 1696.00 8.90 173.10 1692.01 78.18 S 20.80 E 1.58 74.12 1792.00 11.30 175.60 1786.52 94.94 S 22.41 E 2.54 90.43 1889.00 13.30 177.70 1881.29 115.56 S 23.59 E 2.11 110.64 1982.00 13.70 177.30 1971.72 137.25 S 24.54 E 0.44 131.93 2077.00 15.40 174.80 2063.67 161.06 S 26.21 E 1.91 155.20 2173.00 18.40 174.50 2155.51 188.84 S 28.82 E 3.13 182.26 2268.00 20.60 175.20 2245.06 220.42 S 31.66 E 2.33 213.05 2364.00 22.70 177.30 2334.28 255.76 S 33.94 E 2.33 247.63 2460.00 25.30 178.70 2421.98 294.77 S 35.28 E 2.77 285.99 2553.00 27.60 179.40 2505.24 336.19 S 35.96 E 2.50 326.82 2648.00 29.50 '176.60 2588.68 381.55 S 37.57 E 2.44 371.41 2741.00 31.70 176.30 2668.73 428.80 S 40.51 E 2.37 417.66 2833.00 34.50 176.30 2745.79 478.93 S 43.75 E 3.04 466.72 2926.00 37.40 175.90 2821.07 533.39 S 47.47 E 3.13 519.99 3019.00 40.30 176.30 2893.49 591.59 S 51.43 E 3.13 576.90 3112.00 42.00 174.10 2963.52 652.56 S 56.57 E 2.40 636.39 3205.00 43.90 172.00 3031.59 715.45 S 64.26 E 2.56 697.38 3320.00 44.80 167.50 3113.84 794.51 S 78.58 E 2.84 773.34 3414.00 44.60 167.80 3180.66 859.10 S 92.72 E 0.31 835.03 3506.00 44.60 168.20 3246.17 922.28 S 106.15 E 0.30 895.44 3598.00 44.50 168.50 3311.73 985.49 S 119.18 E 0.25 955.94 3690.00 44.50 166.80 3377.35 1048.48 S 132.98 E 1.30 1016.10 3783.00 44.30 167.50 3443.80 1111.92 S 147.45 E 0.57 1076.60 3874.00 44.30 166.10 3508.93 1173.79 S 161.96 E 1.07 1135.55 3967.00 44.50 166.10 3575.37 1236.96 S 177.59 E 0.22 1195.61 4058.00 46.80 169.90 3638.99 1300.59 S 191.07 E 3.91 1256.45 4~49.00 46.40 171.70 3701.52 1365.85 S 201.65 E 1.50 1319.35 4241.00 46.30 172.00 3765.02 1431.74 S 211.08 E 0.26 1383.04 4333.00 46.50 171.30 3828.47 1497.66 S 220.76 E 0.59 1446.73 4426.00 46.50 170.60 3892.49 1564.28 S 231.37 E 0.54 1510.96 4518.00 47.10 169.90 3955.46 1630.38 S 242.73 E 0.86 1574.56 4610.00 47.60 170.30 4017.80 1697.04 S 254.36 E 0.63 1638.68 4700.00 46.50 172.40 4079.12 1762.15 $ 264.28 E 2.10 1701.53 All data is in feet unless otherwise stated Coordinates from slot.fi SO and TVD from RKB for Nabors 18E (70.10 Ft above mean sea level). Vertical section is from wellhead on azimuth 188.74 degrees. Declination is 0.00 degrees, Convergence is 1.26 degrees. Calculation uses the minin~xn curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (ALaska) Inc. Pad X,30 Prudhoe Bay,North SLope, ALaska SURVEY LISTING Page 2 Your ref : NAV! <11627-12988'> Last revised : 20-Jun-95 Measured Inc[in. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 4794.00 45.60 174.80 4144.36 1829.39 S 271.83 E 2.07 1766.84 4887.00 46.20 174.10 4209.08 1895.86 S 278.30 E 0.84 1831.56 4979.00 46.80 174.70 4272.41 1962.28 S 284.80 E 0.80 1896.22 5071.00 45.60 174.80 4336.09 2028.40 S 290.88 E 1.31 1960.65 5164.00 45.40 174.80 4401.27 2094.46 $ 296.89 E 0.22 2025.03 5256.00 45.60 174.80 4465.76 2159.81 S 302.84 E 0.22 2088.71 5347.00 46.10 174.80 4529.14 2224.84 $ 308.76 E 0.55 2152.08 5438.00 46.10 175.20 4592.24 2290.16 S 314.47 E 0.32 2215.78 5530.00 45.30 174.80 4656.50 2355.75 $ 320.21 E 0.92 2279.74 5623.00 45.10 174.50 4722.03 2421.45 $ 326.36 E 0.31 2343.74 5718.00 44.90 173.80 4789.20 2488,28 $ 333.21 E 0.56 2408.75 5812.00 45.60 174.10 4855.38 2554.66 S 340.24 E 0.78 2473.30 5906.00 45.60 174.10 4921.15 2621,46 S 347.15 E 0.00 2538.28 6000.00 46.40 174.10 4986.44 2688,72 S 354.10 E 0.85 2603.70 6095.00 44.60 173.40 5053.03 2756.08 S 361.47 E 1.97 2669.15 6189.00 43.30 172.40 5120.70 2820,81 S 369.52 E 1.57 2731.91 6284.00 43.40 170.60 5189.79 2885,30 S 379.16 E 1.30 2794.19 6376.00 43.50 172.00 5256.58 2947,84 S 388.73 E 1.05 2854.54 6470.00 43.40 171.70 5324.82 3011,84 S 397.90 E 0.24 2916.40 6564.00 43.20 172.00 5393.23 3075.65 S 407.04 E 0.30 2978.09 6658.00 43.30 171.00 5461.70 3139,35 S 416.56 E 0.74 3039.60 6752.00 43.30 171.70 5530.11 3203,08 S 426.25 E 0.51 3101.12 6847.00 43.60 171.00 5599.08 3267.67 S 436.08 E 0.60 3163.47 6942.00 43.80 170.30 5667.76 3332.43 S 446.74 E 0.55 3225.85 7035.00 43.90 170.30 5734.83 3395.94 S 457.60 E 0.11 3286.97 7129.00 44.00 170.30 5802.50 3460.25 S 468.59 E 0.11 3348.86 7224.00 44.10 169.90 5870.78 3525.31 S 479.95 E 0.31 3411.45 7319.00 44.20 169.60 5938.95 3590.43 S 491.72 E 0.24 3474.02 7413.00 44.30 170.30 6006.28 3655.01 S 503.17 E 0.53 3536,12 7507.00 44.50 169.60 6073.44 3719.77 S 514.64 E 0.56 3598,38 7602.00 44.20 170.60 6141.37 3785.19 S 526.06 E 0.80 3661,30 7697.00 44.20 170.60 6209.48 3850.53 S 536.88 E 0.00 3724.24 7793.00 44.20 170.30 6278.30 3916.53 S 547.98 E 0.22 3787,79 7888.00 44.10 170.30 6346.47 3981.76 $ 559.13 E 0.10 3850,56 7983.00 44.20 170.30 6414.63 4046.98 S 570.28 E 0.10 3913,33 8077.00 44.10 169.90 6482.08 4111.48 S 581.54 E 0.31 3975,37 8171.00 44.20 168.90 6549.53 4175.84 $ 593.58 E 0.75 4037,15 8264.00 44.20 169.20 6616.20 4239.49 S 605.90 E 0.22 4098.20 8357.00 42.90 170.60 6683.60 4302.57 S 617.14 E 1.74 4158.83 8451.00 42.80 171.30 6752.52 4365.70 S 627.20 E 0.52 4219.70 8545.00 42.70 171.30 6821.54 4428.77 S 636.85 E 0.11 4280.58 8638.00 42.60 172.40 6889.95 4491.14 S 645.78 E 0.81 4340.87 8733.00 42.50 171.30 6959.93 4554.74 S 654.89 E 0.79 4402.34 8828.00 42.50 171.30 7029.98 4618.18 S 664.60 E 0.00 4463.57 8922.00 42.40 170.20 7099.34 4680.80 S 674.80 E 0.80 4523.91 9017.00 42.40 172.40 7169.49 4744.11 S 684.49 E 1.56 4585.01 9113.00 42.30 171.70 7240.44 4808.16 S 693.43 E 0.50 4646.96 9206.00 42.10 171.00 7309.34 4869.92 S 702.82 E 0.55 4706.57 9301.00 41.70 171.70 7380.05 4932.64 S 712.37 E · 0.65 4767.12 9394.00 41.70 171.70 7449.48 4993.86 S 721.30 E 0.00 4826.2? All data is in feet unless otherwise stated Coordinates from slot.#30 and TVD from RKB for Nabors 18E (70.10 Ft above mean sea level). Vertical section is from weLLhead on azimuth 188.74 degrees. DecLination is 0.00 degrees, Convergence is 1.26 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (Alaska) Inc. SURVEY LISTING Page 3 Pad X,30 Your ref : NAVI <11627-12988'> Prudhoe Bay,North Slope, Alaska Last revised : 20-Jun-95 Measured [nc[in. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 9488,00 41,40 171.00 7519.83 5055.50 S 730.67 E 0.59 4885.76 9584,00 41.00 171.70 7592.06 5118.01 S 740.19 E 0.64 4946.11 967"7.00 40.60 172.00 7662.46 5178.16 S 748.80 E 0.48 5004.25 97-/0,00 40,80 171,70 7732.97 5238.20 S 757,40 E 0,30 5062,28 9861,00 40.60 170.60 7801.96 5296.83 S 766.53 E 0.82 5118.85 9955.00 40.50 170.60 787-5.39 5357.12 S 776.51 E 0.11 5176.92 10046.00 40.40 171.70 7942.64 5415.45 S 785.59 E 0.79 5233.20 10141,00 40,30 171,30 8015,04 5476,28 S 794,68 E 0.29 5291,94 10235.00 40.10 171.70 8086.83 5536.29 S 803.65 E 0.35 5349.89 10327.00 41.70 175.90 8156.38 5596.15 S 810.12 E 3.46 5408.07 10421.00 43.90 176.30 8225.35 5659.86 S 814.46 E 2.36 5470.38 10514.00 45.80 178.40 8291.28 5725,37 S 817,47 E 2,59 5534,68 10605.00 47.50 178,40 8353.75 5791.52 S 819,32 E 1.87 5599.77 10698.00 49.70 181,50 8415.25 5861.26 S 819.34 E 3.44 5668.70 10792.00 51.80 183,30 8474.73 5933.98 S 816,28 E 2.68 5741.04 10887.00 54.00 184,30 8532.03 6009.57 S 811,25 E 2.46 5816.52 10980.00 56.10 185.30 8585.30 6085.53 S 804.86 E 2.42 5892.56 11073.00 57.60 187.20 8636.16 6162.92 S 796.38 E 2.35 5970.35 11165.00 57.50 188.20 8685.53 6239.85 S 785.98 E 0.92 6047.97 11260.00 57.80 187.90 8736.36 6319.32 S 774.74 E 0.41 6128.22 11354.00 59.20 189.60 8785.48 6398.52 S 762,54 E 2.14 6208.36 11447.00 59.80 189.60 8832.68 6477.53 S 749.17 E 0.64 6288.48 11538.00 60.00 189.30 8878.32 6555.19 S 736,25 E 0.36 6367.20 11568.00 59.60 190.30 8893.40 6580.74 S 731.83 E 3.17 6393.12 11627.00 59.34 190.14 8923.38 6630.76 $ 722.82 E 0.50 6443.93 Interpolated KOP 11686.00 65.70 187.90 8950.59 6682.42 S 714.64 E 11.30 6496,24 11718.00 68.30 187.50 8963.10 6711.61 S 710.70 E 8.21 6525.69 11750.00 72.10 186.40 8973,93 6741.49 S 707.06 E 12.31 6555,~r7 11782.00 75.50 184.00 8982.86 6772.09 S 704.28 E 12.84 6586,44 11814.00 77.50 183.60 8990.33 6803.14 S 702.22 E 6.37 6617.44 11846.00 79.90 181.90 8996,60 6834.48 S 700.72 E 9.13 6648,64 11877.00 82.50 179.40 9001.34 6865.10 $ 700.37 E 11.57 6678,96 11909.00 83.80 175.60 9005,16 6896,84 S 701.76 E 12.47 6710,12 11942.00 86.20 176.60 9008,04 6929,63 S 703.99 E 7.87 6742.20 11974.00 87.70 176.30 9009.74 6961.53 S 705.97 E 4.78 6773.42 12005.00 87.40 176.60 9011.07 6992,44 S 707.89 E 1.37 6803.68 12038.00 87.70 176.30 9012,48 7025.34 S 709.93 E 1.28 6835.89 12070.00 87.90 175.90 9013.70 7057,25 S 712,10 E 1,40 6867.09 12102.00 87.80 175.50 9014.91 7089.13 S 714.50 E 1,29 6898.25 12133.00 88.10 175.90 9016.02 7120,03 S 716.82 E 1,61 6928.43 12165.00 87.60 175.90 9017.22 7151,92 S 719.11 E 1,56 6959.61 12195.00 89.30 176.60 9018.03 7181.85 S 721,07 E 6.13 6988.88 12227.00 89.60 178.70 9018.33 7213.82 S 722.38 E 6.63 7020.28 12259.00 87.50 179.80 9019.14 7245.80 S 722.80 E 7.41 7051.83 12291.00 85.30 181.50 9021.15 7277.73 S 722.44 E 8.68 7083.45 12323.00 84.30 183.60 9024.05 7309.57 S 721.02 E 7.24 7115.13 12353,00 84,70 187,50 9026.93 7339.28 S 718.14 E 13.01 7144.94 12385.00 88.90 190.00 9028.72 7370.85 S 713.28 E 15.27 7176.88 12417.00 92.50 190.00 9028.32 7402.36 S 707.72 E 11.25 7208.86 12449.00 92.60 190.00 9026.90 7433.84 S 702.17 E 0.31 7240.82 AIl data is in feet unless otherwise stated Coordinates from slot.#30 and TVD from RKB for Nabors 18E (70.10 Ft above mean sea [eve[). Vertical section is from wellhead on azimuth 188.74 degrees. Declination is 0.00 degrees, Convergence is 1.26 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (A[aska) Inc. Pad X,30 Prudhoe Bay,North Slope, Alaska SURVEY LIST[NG Page 4 Your ref : NAY! <11627-12988'> Last revised : 20-Jun-95 Measured Inc[in. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D ! N A T E S Deg/lOOFt Sect 12480.00 91.40 188.20 9025.82 7464.43 S 697.27 E 6.98 7271.80 12511.00 89.20 188.90 9025.66 7495.08 S 692.66 E 7.45 7302.80 12543.00 89.90 188.90 9025.91 7526.70 S 687.71 E 2.19 7334.80 12576.00 90.00 187.90 9025.94 7559.34 S 682.89 E 3.04 7367.80 12608.00 88.90 187.20 9026.24 7591.06 S 678.69 E 4.07 7399.79 12640.00 87.70 187.20 9027.19 7622.80 S 674.68 E 3.75 7431.76 12672.00 87.60 187.50 9028.51 7654.51 S 670.59 E 0.99 7463.73 12702.00 86.60 186.80 9030.02 7684.23 S 666.86 E 4.07 7493.68 12734.00 85.80 186.10 9032.14 7715.96 S 663.27 E 3.32 7525.58 12765.00 85.80 186.10 9034.42 7746.70 S 659.98 E 0.00 7556.46 12797.00 85.80 185.70 9036.76 7778.45 S 656.70 E 1.25 7588.34 12829.00 85.80 186.10 9039.10 7810.19 S 653.42 E 1.25 7620.21 12861.00 85.80 186.40 9041.45 7841.92 S 649.95 E 0.93 7652.10 12893.00 85.80 187.20 9043.79 7873.61 S 646.17 E 2.49 7683.99 12925.00 85.60 185.40 9046.19 7905.32 S 642.67 E 5.64 7715.87 12957.00 85.70 185.00 9048.62 7937.10 S 639.78 E 1.28 7747.72 12988.00 85.70 186.10 9050.94 7967.87 S 636.79 E 3.54 7778.58 13043.00 85.70 188.05 9055.06 8022.29 S 630.03 E 3.54 7833.40 Projected to TD All data is in feet unless otherwise stated Coordinates from slot.#30 and TVD from RKB for Nabors 18E (70.10 Ft above mean sea level). Vertical section is from wellhead on azimuth 188.74 degrees. Declination is 0.00 degrees, Convergence is 1.26 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (Alaska) Inc. SURVEY LISTING Page 5 Pad X,30 Your ref : NAVI <11627-12988'> Prudhoe Bay,North Slope, Alaska Last revised : 20-Jun-95 Co~nents in wellpath ND TVO Rectangular Coords. Co~ent 11627.00 8923.38 6630.76 S 722.82 E Interpolated KOP 13043.00 9055.06 8022.29 S 630.03 E Projected to TD OCT -I 9 A,~ska Oi! & Gas 6ons~ Corr~r~ission Anchorage AlL data is in feet unless otherwise stated Coordinates from slot ~rJo and TVD from RKB for Nabors 18E (70.10 Ft above mean sea level). Bottom hole distance is 8046.99 on azimuth 175.51 degrees from wellhead. Vertical section is from wellhead on azimuth 184).74 degrees. Declination is 0.00 degrees, Convergence is 1,26 degrees. Calculation uses the minim~ curvature method. Presented by Baker Hughes INTEQ gyro/data B.P. EXPLORATION X PAD, WELL NO. f~.-30 PRUDHOE BAY FIELD, WOA~ Gyro Multishot Survey in 5.5" D~:iilPi Survey date · 26 April, 1995 Job number' AK0495G262 SR106.DOC gyro/data Gyrodata Incorporated P.O. Box 79389 Houston. Texas 77279 713/461-3146 Fax: 713/461-0920 May 9, 1995 Ms. Marian Sloan B.P. Exploration Prudhoe Bay Drilling Department 900 E. Benson Blvd. Anchorage, AK 99508 Re' X Pad, Well # X-30, Prudhoe Bay Field, WOA, Alaska Dear Ms. Sloan, Enclosed please Fred one (1) original and ten copies (10) of the completed survey of Well #X-30 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely Operations Manager RS/gr Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER :AK0495G262 1. DISCUSSION, SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR106.DOC gyro/data 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR106.DOC gyro/data DISCUSSION JOB NUMBER: AK0495G262 Tool 113 was run in X-30 on ATLAS 15/32" Wireline inside 5.5" drill pipe. The survey was run without problems. SR106.DOC .gy oldata SURVEY CERTIFICATION SHEET JOB NUMBER' AK0495G262 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the weilsite. Checked by :- ROB SHOUP OPERATIONS ENGINEER SR106.DOC gyro/data 2. SURVEY DETAILS SR106.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0495G262 CLIENT: B.P. EXPLORATION RIG: ATLAS LOCATION: PRUDHOE BAY W.O.A. WELL: X-30 LATITUDE: 70.24 N LONGITUDE: 149.5 W SURVEY DATE: 26-APRIL, 1995 SURVEY TYPE: MULTISHOT DEPTH REFERENCE: ROTARY TABLE EVELATION MAX. SURVEY DEPTH: 11500 SURVEY TIED ONTO: N/A SURVEY INTERVAL: 100' UTM CO-ORDINATES: TARGET DIRECTION: 186.0 GRID CORRECTION: CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: STODDARD SR106.DOC gyro/data 3. OUTRUN SURVEY LISTING SR106.DOC ~ Gyro da t a D i r e c t i ona i Survey for B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, W.O.A. PRUDHOE BAY FIELD Job Number: AK0495G262 Run Date: 26-Apr-95 23:34:19 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.242000 deg. N Sub-sea Correction from Vertical Reference: 70.1 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 186.000 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference ~ Gyro da t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, Job Number: AK0495G262 W.O.A. PRUDHOE BAY FIELD Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.0 0.0 -70.1 0.00 0.0 0.0 0.00 N 0.00 E 0 - 11500 FT. GYRO RUN IN 7 5/8" CASING. MEASURED DEPTHS REFERENCED TO NABORS 18E R.K.B. AT 70.1 FT. ABOVE SEA LEVEL. 100.0 .43 319.81 100.0 -.3 29.9 .43 .4 319.8 200.0 .52 267.30 200.0 -.5 129.9 .43 1.1 300.7 300.0 .22 288.66 300.0 -.4 229.9 .32 1.7 290.8 400.0 .31 273.84 400.0 -.5 329.9 .11 2.1 288.5 500.0 .54 256.27 500.0 -.3 429.9 .26 2.8 281.9 600.0 .46 241.11 600.0 .1 529.9 .16 3.6 274.4 700.0 .47 201.78 700.0 .7 629.9 .31 4.1 265.8 800.0 1.04 176.69 800.0 2.0 729.9 .64 4.5 249.2 900.0 1.98 158.36 899.9 4.4 829.8 1.04 5.4 220.5 1000.0 3.60 153.44 999.8 8.6 929.7 1.64 8.6 189.7 1100.0 4.50 155.73 1099.6 14.6 1029.5 .91 15.0 174.0 1200.0 5.39 155.76 1199.2 22.1 1129.1 .90 23.3 167.4 1300.0 5.68 157.62 1298.7 30.5 1228.6 .34 32.8 164.2 1400.0 5.81 160.78 1398.2 39.4 1328.1 .34 42.8 163.1 1500.0 5.87 164.37 1497.7 48.8 1427.6 .37 53.0 163.0 1600.0 6.79 167.96 1597.1 59.2 1527.0 1.00 64.0 163.6 1700.0 8.77 171.46 1696.2 72.2 1626.1 2.04 77.5 164.7 1800.0 10.99 173.48 1794.7 88.8 1724.6 2.25 94.5 166.1 1900.0 12.44 174.44 1892.6 108.7 1822.5 1.47 114.6 167.5 2000.0 13.87 174.86 1990.0 131.0 1919.9 1.43 137.3 168.7 · 29 N .24 W .56 N .94 W .60 N 1.57 W .68 N 2.03 W .58 N 2.76 W .28 N 3.57 W .30 S 4.08 W 1.59 S 4.18 W 4.09 S 3.49 W 8.50 S 1.45 W 14.88 S 1.56 E 22.74 S 5.10 E 31.61 S 8.92 E 40.97 S 12.47 E 50.68 S 15.51 E 61.39 S 18.13 E 74.71 S 20.49 E 91.72 S 22.71 E 111.92 S 24.83 E 134.58 S 26.95 E A Gyr oda t a Di r e c t i ona i Survey B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, Job Number: AK0495G262 W.O.A. PRUDHOE BAY FIELD Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2100.0 15.65 175.17 2086.7 2200.0 18.64 175.53 2182.2 2300.0 21.08 175.96 2276.3 2400.0 23.30 176.61 2368.8 2500.0 26.25 176.86 2459.6 156.0 2016.6 1.79 162.6 169.7 185.0 2112.1 2.98 191.9 170.5 218.4 2206.2 2.45 225.8 171.3 255.7 2298.7 2.23 263.4 172.0 297.0 2389.5 2.95 305.2 172.7 159.96 S 29.16 E 189.34 S 31.54 E 223.21 S 34.05 E 260.91 S 36.49 E 302.74 S 38.87 E 2600.0 28.50 177.10 2548.4 2700.0 30.25 177.06 2635.6 2800.0 33.17 176.74 2720.6 2900.0 36.11 176.23 2802.9 3000.0 39.57 175.18 2881.9 342.4 2478.3 2.25 351.1 173.2 390.9 2565.5 1.76 400.0 173.7 442.8 2650.5 2.92 452.5 174.1 498.8 2732.8 2.95 509.3 174.4 559.2 2811.8 3.52 570.6 174.5 348.65 S 41.29 E 397.64 S 43.79 E 450.12 S 46.64 E 506.84 S 50.13 E 568.00 S 54.75 E 3100.0 41.80 173.62 2957.7 3200.0 43.54 172.08 3031.2 3300.0 44.53 170.86 3103.1 3400.0 44.30 169.64 3174.5 3500.0 44.40 169.26 3246.1 623.0 2887.6 2.46 635.8 174.5 689.0 2961.1 2.02 703.6 174.3 756.3 3033.0 1.30 773.0 174.1 823.6 3104.4 .88 842.8 173.8 890.6 3176.0 .29 912.5 173.4 632.87 S 61.13 E 700.11 S 69.58 E 768.84 S 79.90 E 837.81 S 91.74 E 906.53 S 104.54 E 3600.0 44.43 169.10 3317.5 3700.0 44.27 168.72 3389.0 3800.0 44.20 168.63 3460.6 3900.0 44.11 169.17 3532.4 4000.0 44.89 169.98 3603.7 957.6 3247.4 .12 982.3 173.1 1024.4 3318.9 .31 1052.1 172.8 1091.0 3390.5 .09 1121.6 172.6 1157.6 3462.3 .39 1191.2 172.4 1224.8 3533.6 .97 1261.2 172.2 975.27 S 117.67 E 1043.86 S 131.12 E 1112.26 S 144.82 E 1180.61 S 158.24 E 1249.54 S 170.92 E 4100.0 46.58 170.82 3673.5 4200.0 46.17 171.74 3742.5 4300.0 46.31 172.36 3811.7 4400.0 46.52 172.32 3880.6 4500.0 46.79 172.28 3949.3 1293.8 3603.4 1.80 1332.7 172.1 1363.8 3672.4 .78 1405.1 172.1 1433.9 3741.6 .47 1477.4 172.1 1504.3 3810.5 .22 1549.8 172.1 1574.9 3879.2 .27 1622.5 172.1 1320.14 S 182.85 E 1391.69 S 193.83 E 1463.22 S 203.82 E 1535.01 S 213.48 E 1607.08 S 223.23 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, Job Number: AK0495G262 W.O.A. PRUDHOE BAY FIELD Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4600.0 47.35 173.03 4017.4 4700.0 46.78 173.48 4085.5 4800.0 45.48 174.24 4154.8 4900.0 45.93 175.07 4224.6 5000.0 46.10 175.23 4294.1 1646.2 3947.3 1717.6 4015.4 1788.1 4084.7 1858.2 4154.5 1928.9 4224.0 .79 1695.7 172.1 .66 1768.9 172.2 1.41 1841.0 172.2 .74 1912.5 172.3 .21 1984.4 172.4 1679.70 S 232.58 E 1752.40 S 241.18 E 1824.08 S 248.89 E 1895.34 S 255.55 E 1967.03 S 261.64 E 5100.0 45.34 175.65 4363.9 5200.0 45.33 175.66 4434.2 5300.0 45.72 175.74 4504.3 5400.0 45.95 175.64 4573.9 5500.0 45.19 175.56 4643.9 1999.3 4293.8 2069.3 4364.1 2139.5 4434.2 2210.0 4503.8 2280.3 4573.8 .82 2055.9 172.5 · 01 2126.9 172.6 · 40 2198.1 172.7 · 24 2269.8 172.8 · 76 2341.1 172.9 2038.40 S 2109.32 S 2180.47 S 2252.00 S 2323.20 S 267.33 E 272.71 E 278.06 E 283.46 E 288.94 E 5600.0 44.56 175.55 4714.8 5700.0 44.95 175.46 4785.8 5800.0 45.29 175.69 4856.4 5900.0 45.47 175.75 4926.6 6000.0 46.16 175.20 4996.3 6100.0 45.56 174.65 5065.9 6200.0 43.15 174.06 5137.4 6300.0 43.39 173.42 5210.2 6400.0 43.59 172.85 5282.8 6500.0 43.51 172.94 5355.3 2349.7 4644.7 2418.9 4715.7 2488.6 4786.3 2558.6 4856.5 2629.1 4926.2 2699.5 4995.8 2768.0 5067.3 2835.0 5140.1 2902.1 5212.7 2969.2 5285.2 .63 2411.6 173.0 .39 2481.9 173.1 .37 2552.7 173.1 .18 2623.8 173.2 .80 2695.5 173.3 .71 2767.2 173.3 2.45 2837.1 173.3 .50 2905.7 173.3 .44 2974.5 173.3 .10 3043.4 173.3 2393.54 S 2463.74 S 2534.39 S 2605.36 S 2676.84 S 2748.33 S 2817.90 S 2886.04 S 2954.36 S 3022.73 S 294.40 E 299.91 E 305.38 E 310.69 E 316.35 E 322.70 E 329.56 E 337.04 E 345.27 E 353.79 E 6600.0 43.42 172.98 5427.9 6700.0 43.53 173.03 5500.4 6800.0 43.57 172.96 5572.9 6900.0 43.76 172.95 5645.3 7000.0 43.91 172.70 5717.4 3036.2 5357.8 3103.2 5430.3 3170.4 5502.8 3237.6 5575.2 3305.1 5647.3 .09 3112.1 173.3 .11 3181.0 173.3 .06 3249.8 173.3 .20 3318.9 173.3 .22 3388.1 173.3 3091.00 S 3159.29 S 3227.67 S 3296.19 S 3364.91 S 362.21 E 370.59 E 378.99 E 387.46 E 396.11 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, Job Number: AK0495G262 W.O.A. PRUDHOE BAY FIELD Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7100.0 7200.0 7300.0 7400.0 7500.0 44.01 172.48 5789.4 44.08 172.30 5861.2 44.39 172.22 5932.9 44.42 172.06 6004.3 44.61 171.92 6075.6 3372.6 5719.3 .18 3457.6 173.3 3440.2 5791.1 .15 3527.1 173.3 3507.9 5862.8 .32 3596.8 173.2 3575.9 5934.2 .12 3666.8 173.2 3643.9 6005.5 .21 3736.9 173.2 3433.75 S 3502.65 S 3571.78 S 3641.10 S 3710.52 S 405.06 E 414.26 E 423.66 E 433.23 E 443.00 E 7600.0 7700.0 7800.0 7900.0 8000.0 44.41 171.92 6147.0 44.39 171.72 6218.4 44.27 171.70 6289.9 44.14 171.65 6361.6 44.23 171.64 6433.3 3711.9 6076.9 .20 3807.0 173.2 3779.7 6148.3 .14 3876.9 173.1 3847.4 6219.8 .12 3946.8 173.1 3915.0 6291.5 .14 4016.5 173.1 3982.5 6363.2 .09 4086.1 173.1 3779.92 S 3849.18 S 3918.33 S 3987.32 S 4056.28 S 452.85 E 462.81 E 472.88 E 482.98 E 493.11 E 8100.0 8200.0 8300.0 8400.0 8500.0 44.25 171.47 6505.0 44.27 171.75 6576.6 43.85 172.02 6648.4 43.16 172.22 6721.0 42.92 172.64 6794.1 4050.1 6434.9 .12 4155.9 173.0 4117.7 6506.5 .19 4225.7 173.0 4185.1 6578.3 .46 4295.2 173.0 4252.0 6650.9 .70 4364.0 173.0 4318.3 6724.0 .37 4432.3 173.0 4125.29 S 4194.34 S 4263.19 S 4331.38 S 4399.03 S 503.35 E 513.54 E 523.36 E 532.80 E 541.79 E 8600.0 8700.0 8800.0 8900.0 9000.0 42.82 172.90 6867.3 42.80 172.89 6940.7 42.56 173.08 7014.2 42.56 173.25 7087.9 42.44 173.24 7161.6 4384.5 6797.2 .20 4500.3 173.0 4450.7 6870.6 .03 4568.3 173.0 4516.8 6944.1. .27 4636.1 173.0 4582.7 7017.8 .12 4703.7 173.0 4648.6 7091.5 .12 4771.2 173.0 4466.'53 S 4533.97 S 4601.25 S 4668.40 S 4735.49 S 550.35 E 558.75 E 567.03 E 575.08 E 583.02 E 9100.0 9200.0 9300.0 9400.0 9500.0 42.58 173.48 7235.3 42.43 173.74 7309.1 41.92 173.55 7383.2 41.77 173.70 7457.7 41.54 173.90 7532.4 4714.5 7165.2 .21 4838.8 173.0 4780.5 7239.0 .23 4906.4 173.0 4846.1 7313.1 .52 4973.5 173.0 4911.3 7387.6 .18 5040.2 173.0 4976.2 7462.3 .27 5106.7 173.0 4802.60 S 4869.74 S 4936.47 S 5002.77 S 5068.85 S 590.83 E 598.35 E 605.79 E 613.20 E 620.37 E A Gyr oda t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: X-PAD, X-30 LOcation: NABORS 18 E, Job Number: AK0495G262 W.O.A. PRUDHOE BAY FIELD Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 9600.0 41.30 173.74 7607.4 9700.0 40.79 173.75 7682.8 9800.0 40.90 173.85 7758.4 9900.0 40.80 173.63 7834.1 10000.0 40.48 173.55 7910.0 5040.9 7537.3 .26 5172.8 173.0 5105.1 7612.7 .51 5238.5 173.0 5169.0 7688.3 .12 5303.9 173.1 5232.9 7764.0 .17 5369.3 173.1 5296.5 7839.9 .33 5434.4 173.1 5134.62 S 627.50 E 5199.89 S 634.65 E 5264.91 S 641.72 ~ 5329.93 S 648.85 E 5394.66 S 656.12 E 10100.0 40.38 174.06 7986.1 10200.0 40.35 174.96 8062.3 10300.0 41.10 176.26 8138.1 10400.0 43.05 177.89 8212.3 10500.0 45.41 179.51 8283.9 5359.9 7916.0 .34 5499.3 173.1 5423.4 7992.2 .58 5564.0 173.1 5487.5 8068.0 1.14 5629.2 173.1 5553.7 8142.2 2.23 5696.0 173.2 5622.9 8213.8 2.62 5765.4 173.2 5459.13 S 5523.59 S 5588.64 S 5655.56 S 5725.29 S 663.12 E 669.32 E 674.31 E 677.71 E 679.27 E 10600.0 47.14 181.22 8353.1 10700.0 49.31 181.98 8419.7 10800.0 51.64 183.28 8483.3 10900.0 53.92 184.58 8543.8 11000.0 56.01 185.59 8601.2 5694.8 8283.0 2.13 5837.1 173.3 5769.2 8349.6 2.24 5910.9 173.4 5846.2 8413.2 2.54 5987.1 173.5 5925.7 8473.7 2.50 6065.4 173.7 6007.6 8531.1 2.25 6145.7 173.8 5797.55 S 5872.08 S 5949.13 S 6028.56 S 6110.11 S 678.79 E 676.69 E 673.14 E 667.67 E 660.40 E 11100.0 57.60 186.26 8656.0 11200.0 57.05 187.45 8709.9 11300.0 57.99 188.00 8763.6 11400.0 59.34 188.22 8815.6 11500.0 59.61 189.53 8866.4 6091.3 8585.9 1.68 6227.5 174.0 6175.4 8639.8 1.13 6309.6 174.2 6259.8 8693.5 1.05 6391.7 174.3 6345.1 8745.5 1.36 6474.7 174.5 6431.1 8796.3 1.16 6558.1 174.7 6193.'34 S 6276.91 S 6360.50 S 6445.06 S 6530.16 S 651.76 E 641.71 E 630.37 E 618.32 E 605.03 E Final Station Closure: Distance: 6558.13 ft Az: 174.71 deg. A Gyro d a t a D i r e c t i on a i Survey for B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, W.O.A. PRUDHOE BAY FIELD Job Number: AK0495G262SS Run Date: 26-Apr-95 23:34:19 S~rveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.242000 deg. N Sub-sea Correction from Vertical Reference: 70.1 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 186.000 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i on a I Survey B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, W.O.A. Job Number: AK0495G262SS PRUDHOE BAY FIELD SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION. SEVERITY feet deg. deg. feet feet deg./ 100 ft. -70.1 0.00 0.00 0.0 0.0 0 - 11500 FT. GYRO RUN IN 7 5/8" CASING. MEASURED DEPTHS REFERENCED TO NABORS 18E R.K.B. 0.00 AT 70.1 FT. Page CLOSURE DIST. AZIMUTH feet deg. 0.0 0.0 HORIZONTAL COORDINATES feet 0.00 N 0.00 E ABOVE SEA LEVEL. 100.0 .49 283.00 170.1 -.4 200.0 .31 282.28 270.1 -.4 300.0 .29 278.27 370.1 -.5 400.0 .48 261.52 470.1 -.3 500.0 .48 245.64 570.1 -.0 600.0 .47 213.53 670.1 .5 700.0 .87 184.19 770.1 1.6 800.0 1.70 163.83 870.1 3.7 900.0 3.12 154.90 970.1 7.4 1000.0 4.23 155.05 1070.1 12.9 1100.0 5.13 155.75 1170.1 19.9 1200.0 5.60 157.09 1270.1 28.1 1300.0 5.78 159.89 1370.1 36.9 1400.0 5.86 163.38 1470.1 46.2 1500.0 6.54 166.99 1570.1 56.3 1600.0 8.25 170.54 1670.1 68.7 1700.0 10.44 172.97 1770.1 84.7 1800.0 12.11 174.22 1870.1 104.1 1900.0 13.58 174.78 1970.1 126.5 2000.0 15.35 175.11 2070.1 151.8 .43 .35 .18 .22 .19 . 2. 1. 1. 1. 27 54 92 46 13 9O 5O 34 36 83 76 19 64 44 73 1.1 306.4 1.7 293.8 2.1 289.2 2.8 283.9 3.6 276.7 4.1 268.4 4.5 254.2 5.4 229.0 8.6 198.8 15.0 178.6 23.3 169.3 32.8 165.1 42.8 163.4 53.0 163.0 64.0 163.4 77.5 164.4 94.5 165.7 114.6 167.2 137.3 168.4 162.6 169.5 .48 N .73 W .59 N 1.38 W .65 N 1.89 W .61 N 2.54 W .37 N 3.33 W .29 S 3.93 W 1.20 S 4.15 W 3.35 S 3.70 W 7.19 S 2.06 W 13.00 S 1.53 E 20.45 S 4.07 E 29.06 S 7.82 E 38.32 S 11.46 E 47.98 S 14.67 E 58.48 S 17.42 E 71.21 S 19.87 E 87.48 S 22.15 E 107.28 S 24.34 E 129.96 S 26.52 E 155.61 S 28.78 E A G y r.o d a t a D B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, W.O.A. PRUDHOE BAY FIELD Job Number: AK0495G262SS i r e c t i ona 1 Survey Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL C O 0 R D I N A T E S feet 2100.0 18.26 175.49 2170.1 181.3 2200.0 20.92 175.93 2270.1 216.2 2300.0 23.34 176.61 2370.1 256.2 2400.0 26.51 176.89 2470.1 302.4 2500.0 28.93 177.09 2570.1 354.5 2.83 2.49 2.24 2.87 2.13 191.9 170.4 225.8 171.3 305.2 172.0 351.1 172.7 400.0 173.4 185.62 S 31.24 E 221.00 S 33.89 E 261.49 S 36.52 E 308.15 S 39.16 E 360.84 S 41.91 E 2600.0 31.44 176.93 2670.1 412.0 2700.0 34.94 176.43 2770.1 476.5 2800.0 39.05 175.33 2870.1 550.2 2900.0 42.09 173.36 2970.1 634.2 3000.0 44.07 171.42 3070.1 725.4 2.23 2.94 3 .43 2.38 1.63 452.5 173.9 509.3 174.2 570.6 174.5 703.6 174.5 773.0 174.2 418.94 S 44.95 E 484.23 S 48.74 E 558.90 S 54.06 E 644.22 S 62.56 E 737.29 S 75.16 E 3100.0 44.31 169.72 3170.1 819.4 3200.0 44.41 169.21 3270.1 913.2 3300.0 44.31 168.82 3370.1 1006.8 3400.0 44.19 168.70 3470.1 1099.8 3500.0 44.52 169.60 3570.1 1193.1 .91 .23 .26 .13 .69 842.8 173.8 982.3 173.3 1052.1 172.9 1191.2 172.6 1261.2 172.3 833.52 S 91.01 E 929.67 S 108.96 E 1025.73 S 127.57 E 1121.27 S 146.59 E 1217.05 S 164.94 E 3600.0 46.49 170.78 3670.1 1290.4 3700.0 46.23 171.98 3770.1 1391.8 3800.0 46.49 172.32 3870.1 1493.5 3900.0 46.96 172.51 3970.1 1596.7 4000.0 46.91 173.38 4070.1 1701.5 1.76 .65 .26 .43 .69 1332.7 172.1 1477.4 172.1 1549.8 172.1 1695.7 172.1 1768.9 172.2 1316.68'S 1420.22 S 1524.05 S 1629.30 S 1735.98 S 182.27 E 197.81 E 212.01 E 226.09 E 239.23 E 4100.0 45.58 174.42 4170.1 1803.5 4200.0 45.74 175.26 4270.1 1903.9 4300.0 45.34 175.66 4370.1 2004.4 4400.0 45.53 175.70 4470.1 2104.1 4500.0 45.94 175.64 4570.1 2205.0 1.26 .62 .33 .20 .25 1912.5 172.3 2055.3 172.4 2126.3 172.5 2197.5 172.7 2269.2 172.8 1839.70 S 1941.67 S 2043.51 S 2144.63 S 2246.91 S 250.35 E 259.31 E 267.55 E 275.20 E 282.91 E A Gyroda t a D i r e c t i ona i Survey B.P. EXPLOP~ATION WELL: X-PAD, X-30 Location: NABORS 18 E, W.O.A. Job Number: AK0495G262SS PRUDHOE BAY FIELD Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 4600.0 44.96 175.56 4700.0 44.86 175.48 4800.0 45.32 175.70 4900.0 45.89 175.41 5000.0 45.44 174.62 4670.1 2304.8 .71 4770.1 2402.5 .45 4870.1 2501.2 .34 4970.1 2601.5 .56 5070.1 2702.4 .80 2411.0 172.9 2481.3 173.0 2623.2 173.1 2694.9 173.2 2836.5 173.3 2348.04 S 290.70 E 2447.08 S 298.44 E 2547.12 S 306.17 E 2648.81 S 313.97 E 2751.24 S 322.84 E 5100.0 43.26 173.78 5200.0 43.55 172.95 5300.0 43.49 172.95 5400.0 43.48 173.01 5500.0 43.57 172.97 5170.1 2797.0 1.59 5270.1 2889.3 .45 5370.1 2981.8 .10 5470.1 3074.1 .10 5570.1' 3166.7 .06 2905.1 173.3 2973.9 173.3 3111.6 173.3 3180.4 173.3 3249.3 173.3 2847.36 S 332.65 E 2941.30 S 343.55 E 3035.56 S 355.23 E 3129.64 S 366.82 E 3223.91 S 378,.39 E 5600.0 43.81 172.87 5700.0 43.98 172.55 5800.0 44.11 172.29 5900.0 44.41 172.14 6000.0 44.59 171.93 5670.1 3259.8 .21 5770.1 3353.4 .19 5870.1 3447.4 .17 5970.1 3542.2 .22 6070.1 3637.5 .21 3387.6 173.3 3457.0 173.3 3596.2 173.3 3666.2 173.2 3736.3 173.2 3318.75 S 390.17 E 3414.20 S 402.39 E 3510.07 S 415.14 E 3606.75 S 428.36 E 3703.99 S 441.96 E 6100.0 44.40 171.86 6200.0 44.31 171.71 6300.0 44.15 171.65 6400.0 44.24 171.55 6500.0 44.27 171.72 6170.1 3732.8 .18 6270.1 3827.6 .13 6370.1 3921.9 .14 6470.1 4016.1 .11 6570.1 4110.5 .19 3876.3 173.2 3946.2 173.1 4085.6 173.1 4155.3 173.1 4225.1 173.0 3801.23' S 455.79 E 3898.03 S 469.80 E 3994.36 S 483.89 E 4090.58 S 498.08 E 4186.96 S 512.33 E 6600.0 43.65 172.08 6700.0 43.00 172.50 6800.0 42.82 172.90 6900.0 42.70 172.97 7000.0 42.56 173.21 6670.1 4204.0 .53 6770.1 4295.5 .48 6870.1 4386.0 .20 6970.1 4476.1 .12 7070.1 4565.7 .16 4363.4 173.0 4431.7 173.0 4567.7 173 . 0 4635.5 173.0 4703.1 173.0 4282.44 S 525.89 E 4375.75 S 538.56 E 4467.97 S 550.40 E 4559.77 S 561.79 E 4651.09 S 572.87 E A Gyr oda t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 E, W.O.A. Job Number: AK0495G262SS PRUDHOE BAY FIELD Page SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7100.0 42.45 173.27 7200.0 42.51 173.60 7300.0 42.02 173.58 7400.0 41.74 173.73 7500.0 41.42 173.82 7170.1 4655.1 .13 4838.2 173.0 7270.1 4744.6 .22 4905.8 173.0 7370.1 4833.5 .47 4972.9 173.0 7470.1 4921.0 .20 5106.1 173.0 7570.1 5007.7 .26 5172.2 173.0 4742.12 S 583.65 E 4833.17 S 594.11 E 4923.61 S 604.21 E 5012.69 S 614.13 E 5100.86 S 623.70 E 7600.0 40.88 173.75 7700.0 40.89 173.81 7800.0 40.65 173.59 7900.0 40.40 173.95 8000.0 40.42 175.08 7670.1 5093.2 .46 5237.9 173.0 7770.1 5177.8 .13 5368.7 173.1 7870.1 5262.1 .24 5433.8 173.1 7970.1 5345.6 .34 5498.7 173.1 8070.1 5429.0 .64 5628.6 173.1 5187.84 S 633.19 E 5273.88 S 642.56 E 5359.60 S 652.04 E 5444.54 S 661.39 E 5529.25 S 669.59 E 8100.0 41.93 176.95 8200.0 44.94 179.19 8300.0 47.67 181.41 8400.0 51.13 183.00 8500.0 54.86 185.03 8170.1 5515.1 1.60 5695.4 173.1 8270.1 5608.5 2.54 5764.9 173.2 8370.1 5712.7 2.15 5910.4 173.3 8470.1 5828.9 2.48 5986.5 173.5 8570.1 5961.9 2.39 6145.1 173.7 5616.45 S 675.54 E 5710.70 S 678.75 E 5815.41 S 678.07 E 5931.86 S 673.71 E 6064.53 S 664.21 E 8600.0 57.46 186.56 8700.0 58.14 188.02 8796.9 59.61 189.53 8670.1 6111.9 1.54 6309.1 174.0 8770.1 6268.9 1.08 6474.1 174.4 8867.0 6430.6 1.16 6557.6 '174.7 6213.77 S 649.03 E 6369.50 S 628.81 E 6529.61 S 604.83 E Final Station Closure: Distance: 6557.56 ft Az: 174.71 deg. gyro/data 4. QUALITY CONTROL SR106.DOC Quality Control Comparisons B.P. EXPLORATION WELL: X-PAD, X-30 Location: NABORS 18 El W.O.A. PRUDHOE BAY FIELD Job Number : AK0495G262 / AK0495G262 INRUN/OUTRUN Comparison INRUN OUTRUN INRUN Depth Inc Inc Delta Az 1000.0 3.47 3.60 -.130 160.07 2000.0 13.73 13.87 -.139 175.61 3000.0 39.45 39.57 -.120 174.83 4000.0 44.72 44.89 -.167 169.33 6000.0 45.96 46.16 -.197 174.36 7000.0 43.67 43.91 -.237 171.71 8000.0 44.07 44.23 -.158 170.98 9000.0 42.25 42.44 -.188 172.95 10000.0 40.34 40.48 -.140 172.57 11000.0 55.59 56.01 -.422 186.59 For Inclinations Greater than 10 degrees: Average Inclination Difference = -.1964 deg. Average Azimuth Difference - .3342 deg. OUTRUN Az 153.44 174.86 175.18 169.98 175.20 172.70 171.64 173.24 173.55 185.59 Delta 6.630 .750 -.346 -.643 -.838 -.993 -.659 -.296 -.98O .996 gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK0495G262 TOOL NUMBER: 113 MAXIMUM GYRO TEMPERATURE: 76.8c MAXIMUM AMBIENT TEMPERATURE: 38.0 c MAXIMUM INCLINATION: 60.0 AVERAGE AZIMUTH: 175.0 WIRELINE REZERO VALUE: 4' not used REZERO ERROR / K: n/a CALIBRATION USED FOR FIELD SURVEY: 4/21/95 CALIBRATION USED FOR FINAL SURVEY: 5/1/95 PRE JOB MASS BALANCE OFFSET CHECK: POST JOB MASS BALANCE OFFSET CHECK]: CONDITION OF SHOCK WATCHES -.63 -. 15/-.25 -.40 USED 0.0 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY 11500 59.61 190.99 8873.1 6518.6S 561.6E FINAL SURVEY 11500 59.61 189.53 8866.4 6530.16s 605.03E SR106.DOC gyro/data SR106.DOC gyro/data FUNCTION TEST JOB NUMBER' AK0495G262 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 5000 46.2 46.2 46.2 46.2 46.2 AZIMUTH M.D. ft I 2 3 4 5 5000 175.5 175.6 175.7 175.6 175.6 SR106.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR106.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK0495G262 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 113 GYRO SECTION A0012 DATA SECTION A0032 POWER SECTION A0027 COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0074 A0079 A0071 BACKUP TOOL No. 718 GYRO SECTION A0054 DATA S ECTI O N A0025 POWER SECTION A0052 COMPUTER POWER SUPPLY PRINTER INTERFACE A0122 A0074 A0082 A0035 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 15/32 RUNNING GEAR 2 1/2' System TOTAL LENGTH OF TOOL: 28.5 feet MAXIMUM O.D.: 3.6 INCHES TOTAL WEIGHT OF TOOL: 300Lbs SR106.DOC OOQ'9OI, MS 'MEI_LMVHO NO 3OV'MOHON¥ O.i SV-i_LV ">ISIQ QSV 'A=IAMIqS ...40 S=JIdOO '-iVNI4 H/I/W ~DIM NlM 'M'O '~O0_L MO3HO 'S%q/¥ =IAIMM¥ '-IOO.L Q8 (]NV SV-I/V QM 'qO0/Qq ',000'lz ,000g ',00g I, I., 'NnMNI ..LMV.LS '-4.-..tO Mova nR '"'1o O.L OMaZ '-IOO.L na "-IOO_L nR 'NOI_L¥OOq 'QVd X MO-I 3AV--J-I "IAI'd MO=I 8OF 'AEI QN¥IS 'M'O SqOO_L MO3HO =ISMOHQ¥=IQ =IAIMMV MI¥ 08Z~ 00§0 00¢'0 gl. 80 gl.l.O cjlzO0 cj6/Z~;/¢, 0~8~ 08E~ 08 I,g: 000g: 08/_1, 00Zl. S6/9~/~ 00~ E9EC)S6?OM¥ : MBEilAInN E]or .LMOd=I~I -IV'OI~)OIONO~IHO TOTALS: Log T~e 2" + 5" Subsea True Vertical Depth Logs Bluelines Folded Sepias Rolled Sepias Navigamma R E C E IV E D DPR/MDL/MDP . . . Mylar Film AU6 2~ 1 1995 LIS Tape 1 LIS Verification Listing i Alaska 0il & Gas Cons. Oommicsion Anchorage Upon Receipt, Please sign and fax to: Baker Hughes INTEQ / Fax#: 267-6621 __~/ Attn: Raquel Olsbo 7260 Homer Orive, Anchorage, Alaska 99518 907-267-6600 Fax: 907-267-6621 State of Alaska Alaska Oil & Gas Conservation Comm. 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Larry Grant Well Reference Data: Well No: X-30 Field: Prudhoe Bay Unit County:North Slope Borough State:Alaska Date: 8/2/95 API No: 500292255080 BHI Job #: 450-1443 Enclosed is the following data as listed below: Log Type 2" + 5" Measured Depth Logs Bluelines Folded Sepias Rolled Sepias I I 0 2" + 5" Subsea True Vertical Depth Logs Log Type Bluelines Folded Sepias Rolled Sepias Mylar Film Mylar Film 0 I I 0 0 Upon Receipt Please sign and fax to: Baker Fax #:267- Attn: Raquok~ ~ ~ Alaska Oit & G~s Cons. Commission LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 4 May 1995 Transmittal of Data ECC #: 6421.00 Sent by: PRIORITY MAIL Data: OH-LDWG Dear Sir/Madam, Reference: BP X-30 PH PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE + LIS Run ~ 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: · Date: Please sign and me~u~n ~! Pe~ro~echnical Data Cente~ BP Exploration (Alaska) In~ 900 East~Benson Boulevard · · fD ...... FEB 1 2 1995 Alaska 0il & Gas Cons. Commission Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 3 May 1995 Transmittal of Data ECC #: 6421.00 Sent by: US MAIL Data: OH-LDWG Dear Sir/Madam, Reference: X-30 PH PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: DIFL/GR FINAL BL&RF BHC/AC/GR FINAL BL&F SSVD FINAL BL & RF Run # 1 Run # 1 Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received Date ..~.~,~l~ase sign and ~.etu~n Pe~ro~echnlcal. Data Cen%e~ BP Explo~-atton (Alaska) In~ 900 East~eon BOUlevard ,, MAY ] 2 1995 ~,laska Oil & Gas Cons. Commission Anchorage 'CONSERVATION COMMISSION / TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 April 3, 1995 Terry Jordan Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit X-30 BP Exploration Permit No: 95-41 Sur. Loc. 4722'NSL, 876'WEL, Sec. 7, T10N, R14E, UM Btmhole Loc. 1956'NSL, 307'WEL, Sec. 18, T10N, R14E, UM Dear Mr. Jordan: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman ~ / _ BY ORDER OF TH~ OMM SION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA 'ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT-TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill I-Illb. Type of well. Exploratoryl-1 Stratigraphic Test [] Development Oi: [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 70.1' fe et Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchorac/e. Alaska 99519-6612 ADL 47475 4. Location of well at sudace 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 4722' NSL, 876' WEL, SEC. 7, TION, R14E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2057'SNL, 129' WEL, SEC. 18, TION, R14E X-30 (43-18-10-14) 2S100302630-277 At total depth 9. Approximate spud date Amount 1956' NSL, 307' WEL, SEC. 18, T!ON, R14E 4/15/95 $200,000.00 ,12. Distance to nearest 13. Distance to nearest well ~14. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 28313-3324' feet No close aPProach feet 2560 13014' MD/9025' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth zoo feet Maximum hole angle 87 o Maximum surface 3330 psig At total depth (TVD) 8800'/3560 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 31' 31' 111' 111' 260 sx Arcticset (Approx.) 13-1/2'' 10-3/4" 45.5# NT80 BTC 3287' 30' 30' 3317' 3079' 965sxCSIII/375sx'G'/250sxCSII 9-7/8" 7-5/8" 29.7# L-80 NScc 11504' 28' 28' 11532' 8895' 1265 sx Class "G" 6-3/4" 4-1/2" 12. 6# L-80 NSCT 1632' 11382' 8820' 13014' 9025' Uncemented slotted liner 19. To be completed for Redrill, Re-entry, and Deepen OPerations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth StructUral Conductor R'EE[IVEb Surface Intermediate Production MAR :511995 Liner - A!~ska 0il & Gas Cons, Commission Perforation depth' measured ' true vertical /~nch0rr · 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed reportl-I 20 AAC 25.050 requirements[] 21. , hereby certify that t~e~gcF/.~ is true and correcttothe best of my knowledge Date ?//-z/,/, Signed ' / Title Drilling Engineer Supervisor " Commission Use Only Permit Number IAPI number Approval date See cover letter ~,.~- ~-//,,/ 150-~::~2-~--' .~...~-...5".-,<;~:::> '.~-~.----~',,,.~-- for other requirements Conditions of approval Samples required [] Yes J~ No Mud log required []Yes ~ No Hydrogen sulfide measures 'E~ Yes ~l~ff4o Directional survey required ~ Yes [] No Required working pressureD~i'~ -I:'-~r~r~I'~' ~i--.~,,,~,,~,~,~,u~- 1-13M; I~5M; []10M; 1'-115M; Other: David W. Johnston-,' by order of Approved by Commissioner me commission Date~..~. ~ _ .Form 10-401 Rev. 12-1-85 Submit in triplicate RECEIVED PROPOSED DRILLING AND COMPLETION PROGRAMd/~R 3 ] 1995 Aiaska Oil & Gas Cons. Commission WELL X-30 ~chor~ ,- MIRU. NU diverter and function test same. , Drill 13-1/2" hole to + 3,079' md/3,017' tvd. Run and cement 10-3/4" 45.5# NT-80 BTC casing to surface. o Install blowout prevention equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annul~ preventer. Function test BOPE to 5,000/250 psi. , Test 10-3/4" casing to 3,000 psi for 30 minutes. A formation leak-off test will be performed 10' below the 10-3/4" shoe. ° Directionally drill 9-7/8" hole to the top of the Shublick @ + 11,532' md/8,895' tvd. Run 7-5/8" 29.7# L-80 NSCC casing string and cement with Class G cement to 1,000' md above the casing shoe. Test casing to 3,500 psi. ° Drill a 6-3/4" hole 10' outside of 7-5/8" casing and test the formation to a minimum of 0.5 ppg over the mud weight t° be used to drill the hole section. Drill the 6-3/4" hole to the TD of the pilot well at + i2,058' mcl/9,158' tvd. Run DIL/BHCS/Density/Neut/GR wireline logs across open hole. Possible RFT's if hole conditions permit. . Plugback pilot hole to the 7-5/8" casing shoe with a cement plug. Drill off cement plug and 10' on new hole and displace mud system to Xanvis KC1 mud system. Directionally drill to horizontal and continue to TD at + 13,013' md/9,025' tvd. . Make a hole opener run with a 7-5/8" casing scraper spaced to clean where the packer will be set. . Run 4-1/2" 12.6# NT-80 slotted NSCT liner with liner top packer and two external casing packers spaced in the open hole. Liner will be set at TD and lapped +150' inside 7-5/8" casing shoe. Release from packer and displace Xanvis mud to filtered seawater. 10. Make an external casing packer inflation run. Perform cleanout trip as needed. Spot lithium hypochlorite breaker across liner length on last trip inside 4-1/2" liner. 11. Run 4-1/2" L-80 tubing with SSSV, GLM's, and 7-5/8" packer assembly. Set packer and test tubing annulus w/3,500 psi. 12. Set BPV. ND BOPE. Freeze protect well to 2100' TVD through shear valve in top GLM station..Release rig. Drilling Hazards · No hydrocarbon-bearing zones above the Sag River formation based on X Pad logs. · Losses have been encountered drilling the Kingak, Sag River, and Sadlerochit formations on X pad. · A minimum of 9.5 ppg mud weight will be used to drill the Cretaceous injection interval. This will allow a 100 psi trip margin over the expected 9.2 ppg EMW @ 5000' sstvd. Well Plan Summary CASING SIZE: 10-3/4" 10-3/4" SURFACE CASING CEMENT PROGRAM- BJ SERVICES CIRC. TEMP: 40°F PREFLUSH: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET HI ADDITIVES: retarder WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx APPROX. # SACKS: 965 MIX WATER: THICKENING ThME: > 4 hrs 10.53 gps TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 + 1.0 ghs FP-6L WEIGHT: 15.8ppg YIELD: 1.15 ft3/sx APPROX. # SACKS: 375 MIX WATER: 4.95 gps THICKENING TIME: > 3-1/2 hrs TOP JOB CEMENT TYPE: COLD SET II ADDITIVES: WEIGHT: 14.95 ppg APPROX. # SACKS: 250 YIELD: 0.96 fl3/sx MIX WATER: 3.89 gps THICKENING TIME: Greater than 2 hrs @ 50°F CENTRALIZER PLACEMENT: 1. Run 1 bow type centralizer per joint for the first 15 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME: 1. Lead slurry from TD to surface w/100% excess (less the tail slurry volume). 2. Tail slurry volume 375 sx (to cover 500' of casing shoe w/100% excess). 3. Top job volume 250 sx. Well Plan Summary RECEIVED MAR 3 1 1995 Aiaska 0il & 6as Cons. Commission Anchor~. ' 7-5/8" PROTECTION CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 7-5/8" CIRC. TEMP: PREFLUSH: 20 bbls fresh water SPACER: 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. 140°F TAIL CEMENT TYPE: CLASS G ADDITIVES' 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1.0 ghs FP-6L WEIGHT: 15.8 ppg APPROX. # SACKS' 265 FLUID LOSS: 100-150 cc/30 minutes YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps THICKENING TIME: 3-1/2 to 4-1/2 hrs FREE WATER: 0 cc CENTRALIZER PLA CEMENT: 1. Run 1 Turbulators per joint from TD to 500' MD above shoe. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix the tail slurry on the fly. CEMENT VOLUME: 1. Tail slurry to 11,532' MD (1000' above shoe) 2. 80' MD 7-5/8" 29.7# capacity for float joints. Note: No hydrocarbon bearing zones are expected in the Cretaceous interval. Well Plan Summary RECEIVED MAR $11995 Oil & Gas Cons. Commission Anchor~ ' l Well Name- IX-30 Well Plan Summary ype of Well (producer or injector): I Producer I Surface Location: 4722' FSL 876' FEL Sec 07 T10N R14E Start of Horizontal 2057' FNL 129' FEL Sec 18 T10N R14E Location: End of Horizontal 1956' FSL 307' FEL Sec 18 T10N R14E Location: Estimated Start Date: 14-15-95 [Mjb: 113,014'1 [AFE Number: ]4P0635 I IOperating days t° complete: I ITvD: 19.025. I I RT'GL 31.0' lWell Design (conventional,slimhole,etc.) ISlimhole Horizontal w/4-1/2" Slotted Liner (Probable ECP's and Possible MLAS's) Formation Markers: Formation Tops MD TVD (RKB) Base Permafrost 2032' 2000' Ugnu 4A (K-15) 5048' 4345' Top Uvmau Injection 4323' 3815' Top of Cretaceous Injection Interval Base U~mau Injection 6716' 5565' Btm of Cretaceous In?ct/on Interval Top Seabee/K- 10 7509' 6145' LCU/Top Kingak 10107' -i 8045' 20' to 40' Fault 11142' 8770' Should be crossed in Kingak section Sag River 11494' 8876' Oil/Gas - 7-5/8" Casing Point Top Shublik 11524' 8891' Top Sadlerochit (PH) 11672' 8965' Start of Horizontal 11808' 8972' Total Depth of Pilot 12058' 9158' 150' md below OOWC Well Total Depth of 13014' 9025' Horizontal Well Casing/Tubin gram: Hole Csg/ Wt/Ft Grade Conn Length Top Btm S i z e Tb g MD/TVD MD/TVD O.D. 30" 20" 91.5# H-40 Weld 80' 31'/31' 111'/111' 13-1/2" 10-3/4" 45.5# NT80 BTC 3287' 30'/30' 3317'/3079' 9-7/8" 7-5/8" 29.7# L-80 NSCC 11504' 28'/28' 11532'/8895' 6-3/4" 4-1/2" 12.6# L-80 N$CT 1632' 11382'/8820' 13014'/9025' slotted Tubing 4-1/2" 12.6# L-80 NSCT 11156' 26'/26' 11182'/8720' Logging Proeram: ]Open Hole Logs: y 13-1/2" Hole INone 9-7/8" Hole INone 6-3/4" Hole I BHC-AL/DIFI_JZDL/CN/GR/CHT (E-Line) I Cased Hole: INONE DSS X-30 Well Plan Page 2 RECEIVED A!aSk~ Oil & Gas Cons. Commission gnchoa ram: ad-Properties: [ 13-I/2" hole section: SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 0' 8.5 + 300 40-60 30-60 50-80 9-10 15-25 3,317' 9.5 100-200 25-50 15-25 2540 9-10 15-25 Hazards/Concerns Due to li[~ht gravel expectations, no real concerns in surface hole. Intermediate Mud Properties: [ 9-7/8" hole section to top of Sag: LSND Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 3,317' 8.8-9.0 3540 8-12 3-6 8-10 9.0-9.5 8-12 5,000' 9.5 40-45 10-12 4-8 8-12 9.0-9.5 6-8 10,107' 9.8-9.9 4045 10-12 4-8 8-12 9-10 <6 HTHP- 15.0 11,532' ] 9.8-9.9 45-50 12-15 4-8 8-12 9-10 <6 HTHP- 15.0 Hazards/Concerns Cretaceoous Overpressure expected - plan MW to be at least 9.5 ppg. Utilize hi vis sweeps to assist hole cleaning Monitor LSYP and increase if problems occur trying to clean the hole. Potential high torque could need lubricant use. Reduce API fluid loss to <6 cc before drilling Kingak Section. Lost Circulation potential as we cross faults & enter Sag River. If high torque is encountered, respond with lubricants. Note: The Jurassic shales may be particularly troublesome on this pad, so treat with Baratrol and Boreplate at 2.0 ppb each. Production Mud Properties: [ 6-3/4" hole section: LSND for Pilot Hole Xanvis KCL for Horizontal Depth .: Density Marsh Yield 10 sec 10 rain pH Fluid (PPG)` Viscosity Point gel gel Loss 11532' 8.8-9.0 35-45 8-12 3-6 8-10 9-10 <6 12,058' 8.8-9.0 35-45 8-12 3-6 8-10 9-10 <6 Plugback Swap to Xanvis KCI 11,532' 8.8-9.0 50-60 3040 15-20 18-24 9.5-10.5 <6 13,014' 8.8-9.0 50-60 3040 15-20 18-24 9.5-10.5 <6 Hazards/Concerns Lost Circulation still a possibility due to severe overbalance in Sadlerochit. Differential sticking possible with overbalance situation. Ensure chlorides are below 19,000 ppm prior to logging in LSND mud system. Perform/report daily chec 'ks on KC1 concentrations in Xanvis KC1 system. High torque may be experienced and should be countered with lubricants. Directional: [KOP: t700, Maximum Hole Angle: 7° I Tangent Angle 43° Close Approach Well: None Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Disposal- Cuttings Handling: CC2A Fluid Handling: CC2A Annular Injection: Where possible due to proximity of X-30, use the following table for reference for permitted wells. DO NOT exceed 35,000 bbls pumped into the annulus. AREA WELL PREV VOL PERMITTED PERMI'I-i'ED DATES INJECTED VOL (BBLS) (BBLS) V~A- X-21 637 35,000 1/1/95-12/31/95 V,,QA X-22 2916 3S,O00 1/1/9S-12/31/95 W3A X-28 1709 35,000 1/1/95-12/31/95 W'3A X-30 0 35,000 1/1/95-12/31/95 , DSS X-30 Well Plan Page 3 RECEIVED MAR 311995 Alaska 0il & (;as Cons. Commission Anchorr .- Well Overview ~11, X-30, is a slimhole horizontal producer. The well will further appraise the X-Pad/DS-14 ,~lqery area of the Prudhoe Bay Unit targeting Zone 4 in the Sadlerochit. ]'he well is planned as follows: Hole Size 13-1/2" Hole 9-7/8" Hole 6-3/4" Hole Completion: Casing Size 20" Conductor (pre-drilled) 10-3/4" Surface Casing 7-5/8" Intermediate Casing Pilot Hole to identify OWC 4-1/2" Slotted Liner 4-1/2" L-80 Tubing. Casing Point 10' TVD above SV3 Covering all Kingak and set @ top Shublick 150' MD past OOWC HAW to 20' TVD above OWC Drilling Hazards Surface Close Approach Well Shut-ins The adjacent surface well, X-14, is 34' (within 60') of X-30 and should be shut-in during rig moves. The adjacent surface well, X-13, is 75' (greater than 60') and does not need to be shut in during rig moves. This includes bleeding off all pressured lines. X-14 is currently flowing 1,070 bopd and X- 13 is flowing 600 bopd. Please coordinate with the Production Group to minimize this shut-in oil. Drilling Close Approach Well Shut-ins There are no drilling close approach wells if the survey program and tolerance lines are strictly followed. Pore Pressure Expectations CRETACEOUS: The 'recommended minimum mud weight before drilling the Cretaceous injection interval between 4,323' md and 6,716' md is 9.5 ppg. The highest estimated formation pressure in the Cretaceous injection interval is a 9.2 ppg EMW @ 5936' md (5065' tvd rkb). Adding a 100 psi trip margin, the minimum mud weight calculates to be 9.5 ppg EMW. In the intermediate hole section, the Cretaceous interval defines the need for the highest mud weight. Although the Kingak has a lower pore pressure, the mud weight needed for the Cretaceous generally helps hole stability problems with the Kingak. SAG RIVER: No formation pressures were available in the Sag River sand. Out of the last two wells drilled on X pad in 1994 one, X-31, was able to drill the Sag River with 9.0 ppg. In the other well, X-20, the intermediate hole was drilled through the Sag River formation with 10.2 ppg' fluid. X-28 & X-35 wells drilled the production hole with 8.9 ppg. SADLEROCHIT: The formation pressure at 8800' sstvd is 3,560 psi or 7.7 ppg EMW. See the minimum mud weight curve for better details as to pressure expectations/mud weight requirements. Cretaceous Injection Since most injection into the Cretaceous interval is over 2 miles away, little risk of seawater influx is expected while drilling the 9-7/8" hole. The last two wells that were drilled from X pad, X-20 and X- 30, confirmed this due to the 9.5 ppg MW used to drill this interval. Lost Circulation There are several possible situations where circulation could be lost during this well. The most likely case will be while drilling just above the Sag River. There is a fault (20' to 40' throw) expected in the 9-7/8" hole near the bottom of the Kingak at 11,142' md (8770' tvd rkb). With this possible loss zone above the Sag River formation, the rig crew should be alert to losses in the wellbore and be ready to accurately measure loss rates if they occur. DSS X-30 Well Plan Page 4 RECEIVED MAR ' 995 A!~..~k~ 0il & Gas Cons. C0mmissi0r~ Anch0r[ ,< shale causes an increase in the expected mud weight, pre-planning mud sources ~n .~st circulation may be warranted. X-20 and X-30, TD'd the intermediate hole section with ~,g fluid and had no losses. On the other hand, X-28 & X-35, which also had mud weights of . ppg, both lost mud while running intermediate casing. X-20 experienced losses in the production interval while using 9.0 ppg fluid. The losses were stopped, and a pilot hole completed successfully. The horizontal section of the hole experienced losses at _+4 bph all throughout this section. Surface Casing Shoe Kick Tolerance Kick tolerance for the casing shoe is calculated as 48 bbls of influx assuming a swabbed gas influx at TD along planned directional path with 9.5 ppg MW, 9.5 ppg reservoir pore pressure, and a 12.5 ppg shoe test. DSS X-30 Well Plan Page 5 RECEIVED MAR 31!99,5 ~iaska Oil & Gas Cons. Commission Anchor~" SHARED SERV I CED DR ILL I NG X-30 HORZZONTAL (P2) PLAN VIEW CLOSURE · 8068 feet at Azimuth ~75.75 DECLINATION.' 29.302 E SCALE · ~ inch = 300 feet :DRA~N. ' 03/27/95 /nadrj]] Schlumberger Marker Identification MD N/S A) TIE-IN/CURVE 10/100 11532 6595 B) END lO/~O0 CURVE ~1BOB 6855 C) CURVE 10/100 13009 B04~ D) END 10/100 CURVE 13014 B046 E) TD 13014 8046 /,L /, DPC 6300. 6450 ........ 6600 6750= 5900 E/w B~5 5@8 7050- 7200' 7950- 8~00 8250-' 8400 i 7350 7500 7650, 7800- 300 · ~50 0 150 300 450 600 750 900 ~050 1200 1350 J500 1650 1800 <- WEST · EAST -> {L",a:~'2]] icl._,'-- X30HO2;2 B$.57 ~0:57 AN Il SHARED SERVTCED ( DRILLING <KB> 8400- 9000I 9600~ ANADRILL AKA-DPC i i . ..~ I D) ..... i ..... %ESE- pl~p2~F~5'sl' - LFOC'O I F) G) t H) I) J) K) ~v) - i~o L) M) ~) Start MD End MD 0 7O0 1200 1800 2022 3063 1O227 11133 11189 10446 Planned Activity 700 Drill vertically to KOP. 1200 Start build at 101100, to 5.00° incl at 170.00° az. 1800 Build at 2°/100' to 17.00° incl at 170.00° az 2022 Maintain tangent of 17.00° incl at 170.00° az. 3063 Start 2.5°/100' curve to 43.00° incl at 172.00° az. 10227 Maintain tangent of 43.00° incl at 172.00° az 11133 Start 2.0°/100` curve to 60.00° incl at 180.07° az. 11189 Maintain tangent of 60.00° incl at 180.07° az 11446 Start 2.0°/100' curve to 60.00° incl at 186.00° az. 12058 Maintain tangent of 60.00° incl at 186.00° az. to TD 600 1200 i. BOO 4200 X-30 PILOT HOLE VERTICAL SECTION (P2) VIEW Section at: J86.00 TVD Scale.: J inch = J200 feet Dep Scale.: ~ inch = J200 feel Braun ..... : 03/27/95 Anadri]] Schlumberger Marker Identification MD BKB SECTN ]NCLN A) KB 0 0 0 0.00 B) KOP/BUILD J/JO0 700 700 -0 0.00 C) BUILD 2/~00 3200 ~99 2~ 5.00 END 2/100 BUILD 1800 ~787 ~31 17.00 CURVE 2,5/100 2022 2000 J93 ~7.00 END 2.5/100 CURVE 3063 2894 692 43.00 10-3/4" £SG PT 33J7 3079 860 43.00 CURVE 2/JO0 J0227 8.133 5433 43.00 END 2/JO0 CURVE J~33 9695 6J29 60.00 CURVE 2/~00 ~J~B9 8723 6J77 60.00 END 2/JO0 CURVE ~446 8952 6399 60.00 7-5/B" CSG PT J1532 8995 6474 60.00 TARGET-250 FT RADIUS 1i746 9002 6659 60.00 TD 12058 9~58 6929 60.00 2400 3000 3600 Section Departure : R ECE.iVE IAF( 5[1 1995 Gas Cons. Con Anchbr~ ' ~missiou 4800 5400 6000 6600 7200 7800 (Anar~rj]] (:)g3 X3OPILP2 B~.52 )~:OB AR :)) SHARED SERV T CED DR T LL T NG Narker Identif~cat]on ND N/S E/W A) KB 0 0 B) KOP/BUILD ~/~00 700 0 C) BUILD 2/~00 ~200 D) END 2/100 BUILD ~800 J34 E) CURVE 2.5/~00 2022 198 F) END 2.5/~00 CURVE 3063 708 ~2 6) ~0-3/4" CSG PT 33~7 879 ~36 H) CURVE 2/~00' ' ~0227 5547 792 I) END 2/~00 CURVE ~J33 6250 835 J) CURVE 2/~00 1~189 6299 B35 K) END 2/~00 CURVE ~1446 652~ 823 L) 7-5/8" CSG PT 1~532 6595 8~5 M) IARGET-250 FI RADIUS ~1746 6779 796 N) ID 12058 7048 768 24 35 X-30 PILOT HOLE (P2) PLAN VTEX CLOSURE ..... : 7090 feet at Azimuth ~73.78 DECLINATION.: 29.302 E SCALE ....... : ~ inch = ~200 feet DRAWN ....... : 03/27/95 /lnadrJ 77 $£hTumberger 600- D,,. i I : Al'4 ~ DR~LL AkA: ', ' ,' ~ i . i : ! F ; f"iJ~:i< "2 ~- ,Jo,., i ) i I ' ' ; ' : ; i i , ; t I i · ,: ! ; i I ! i . · i : ' ' ' ' REC ,, i ; ' ~ I i i ': ! i ~::50 Fl TARGEI RAD US i I t i ' ~ I i i ~ J . , 60 ~20 6500- 7200 7BO0 4200 3600 300( 2400 1800 ~200 600 0 600 ~200 1800 2400 3000 3600 4200 <- WEST' EAST -> (Anadril] (~)93 X30?iLP2 5}.52 ~I:09 AR. SHARED SERVICED DRILLING Anadr)]] Soh]umberger ,. Marker Identification MD AJ TIE-tN/CURVE I0/]00 i1532 B) END lO/lO0 CURVE 11808 C) CURVE lO/lO0 13009 D) END 10/100 CURVE 130]4 E) TO '13014 BKB SECfN 8895 6390 8972 , 6652 9025 1,7852 9025 7857 9025 7857 INCLN 60. O0 87,47 87.47 87.00 87.00 X-30 HORIZONTAL VERTICAL SECTION Section at: 188.90 TVD Scale.' 1 inch = 300 feel Der Scale.' ~ inch = 300 feet Drawn · 03/27/95 (P2) VIEW 8200- 8350- ! i ANADP:ILL /~KA-DP(' ,. t ~ -':'PROVD 8500- - ' ......... I ' -~r: .......... L ~ .......... L " I 8650 .... ! . .',. i ..... I ............. i ..................................... ~ .......... ' .............................../--! ; .............................. ~oo-~ ~ _:::_!= ..... ~.__1 ..... i ......... . 895o .... i - .. L .......... ! .... :::~...[ .......... I..~...-''~,---- ----~--------- ~,~.,~..,,.~'~.~,,, ....... r .......... ~ ........ '--.--c .... :1 ........... : .... '::::::'"'-'~::::::-~',~':':::::"'""i'":' 9100 -¢!6.~c.,,,_-.¢~- _-.~'a_n] ": .................. ........ -"-. ~ ; , ~' .......... i .......... i .......... ~ --- I ............................ ::~ ~ .;..., ,~,,,~""'1 ] .,,. "~. ~ ~ i .. , 9550 .... ~' ~'~ CT ' j'~ i , ..... I ......... ' ' - 'j ........................ , ~j ...... ~oo 5700 5850 6000 6150 6300 6.450 6600 6750 6900 7050 7200 7350 7500 7650 7800 7950 8100 8250 8400 Section Departure (Anadrill [C)93 x3oIlonP8 01.52 10:59 ~,u I) WELL PERMIT CHECKLIST F=LD POOL UNIT# PROGRAM: exp [] //J. 'c3 dev~ redrll [] serv [] ON/OFF s~o~ ~ ADMINISTRATION ENGINEERING 1. Permit fee attached ................... 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool .............. 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... ' 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order ..... 12. Permit can be issued without administrative approval. 13. Can-permit be approved before 15-day wait ....... APPR 14. Conductor string provided ............... 15. Surface casing protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf csg. 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed ......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate ............. 26. BOPE press rating adequate; test to 27. Choke manifold complies w/API RP-53 (M~y 84) ....... 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............ GEOLOGY 'R D 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones ..... Y N / 32. Seismic analysis of shallow gas zones .......... y,. N 33. Seabed condition survey (if off-shore) ......... ./Y N 34. Contact name/phone for weekly progress reports .... / Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: - A:%=ORMS\cheklist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. LIS VERIFICATION LISTING FOR: BP EXPLORATION _ "~ AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE TCDM TCDX STVD WBCS Note: BELO ,, ARE THE MNEMONICS THAT CAN BE FOUND ON THE LIS TAPE GENERATED FOR BP EXPLORATION X-30 HORIZ Azimuth - Tree (Posted) Calculated Dielectric Constant Gamma Ray Memory (API) [RWD] Gamma Ray (API) [MWD] Inclination - Tree (Posted) Phase Difference Borehole Corrected [RWD] Phase Difference Dielectric Corrected [RWD] Phase Difference Elapsed Time [RWD] Phase Difference Data Density Integrated [RWD] Resistivity (AT) Borehole Corrected [RWD] Resistivity (AT) Corrected Dieleclric Effect [RWD] Rate of Penetration Resistivity (PD) Borehole Corrected [RWD] Resistivity (PD) Corrected for Dielectric Effect [RWD] CDS Temperature [RWD] CDS Temperature [MWD] Subsea Tree Vertical Depth Surface Weight On Bit AT is Attenuation PD is Phase Difference MWD is Measurement While Drilling RWD is Recorded While Drilling deg MWD-API MWD-API deg deg deg mins pt/ff ohm-m deg F deg F ff klbs Copyright 1987,1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. All rights reserved. PROGRAM: TAPESCAN REVISION: 2.64 Start of execution: Wed 9 AUG 95 3:27p ECHOING INPUT PARAMETERS: INPUT PARAMETER FILE: TAPESCAN.INP 1 2 3 4 5 6 7 123456789012345678901234567890123456789012345678901234567890123456789012 1 AUTOCURV = 0 , ! Automatic Curve renaming: 0--OFF, I=ON 2 AUTOFILE = 0 , ! Automatic FILE= generation: 0=OFF, I=ON 3 COMMENTS = 1 , ! Decode LIS Comment records: 0=OFF, I=ON 4 INFORECS = 1 , ! Decode LIS Information records: 0=NO, I=YES 5 LISTMETHOD = 0 , ! Listing Method: 0=depth units 1--tape units 6 LISTFREQ = 50, ! Listing Frequency: Every n units 7 LISTMAX = 0 , ! Listing Maximum (O--no limit, value=list limit) 8 STATS = 0 , ! Statistics generation: 0=OFF, I=ON 9 FORCETYP = 0 , ! (I=BIT,2=LIS ... thru 35=Array Accoustic) (see table) 10 WRITEASCII = 0 , ! If 1, all ascii files will be written (file0001.dat,etc.) 11 WRITETAP = 1 , ! Write Tape-Image File: 0=NO, I=YES 12 SPLITLIS = 1 , ! If 1 and WRITETAP on, split LIS logical files to physical 13 SUBFILES =/0/, ! Tape Subtile write selection (WRITETAP must be on) 14 INTERPOLATE='YES' ! Set up for TAPE2WDS to interpolate datums ('YES'or~qO') 15 END ~--~- USER INPUT PARAMETERS AUTOCURV = 0, AUTOFILE = 0 , COMMENTS = 1, INFORECS = 1 , LISTMETHOD = 0, LISTFREQ = 50, LISTMAX = 0, STATS = 0 , FORCETYP = 0 , WRITEASCII = 0 , WRITETAP = 1, SPLITLIS = 1 , SUBFILES =/0/, INTERPOLATE='YES' END !-- PROCESSING INTERVAL FROM 0.000 TO 0.000 ............ { I-- CONSTANT PARAMETERS ........................................... { AUTOCURV= 0.000000E+00 AUTOFILE= 0.000000E+00 COMMENTS= 1.00000 FORCETYP= 0.000000E+00 INFORECS= 1.00000 LISTFREQ= 50.0000 LISTMAX = 0.000000E+00 LISTMETH= 0.000000E+00 SELFTEST= 0.000000E+00 SPLITLIS= 1.00000 STATS = 0.000000E+00 WRITEASC= 0.000000E+00 WRITETAPTM 1.00000 dpcoef = 1.00000 dpcte = 1.00000 ch'length= 0.000000E+00 listwave= 0.000000E+00 maxrecln= 0.000000E+00 minrecln= 0.000000E+00 nsamples= 0.000000E+00 numcurvs= 0.000000E+00 numdatar= 0.000000E+00 numrecfl= 0.000000E+00 tfendep = 0.000000E+00 tflevsp = 0.000000E+00 tfstdep = 0.000000E+00 wcrbot = 0.000000E+00 wcrlevsp= 0.000000E+00 wcrtop = 0.000000E+00 ~-- ARRAY PARAMETERS .............................................. SUBFILES(1) SUBFILES(3) SUBFILES(5) =-9999.00 SUBFILES(7) = -9999.00 SUBFILES(9) = -9999.00 SUBFILES(11) = -9999.00 SUBFILES(13) =-9999.00 SUBFILES(15) = -9999.00 SUBFILES(17) = -9999.00 SUBFILES(19)---9999.00 SUBFILES( 21) = -9999.00 SUBFILES(23) =-9999.00 SUBFILES(25) =-9999.00 SUBFILES(27) =-9999.00 SUBFILES(29) =-9999.00 SUBFILES( 31) = -9999.00 SUBFILES(33) = -9999.00 SUBFILES(35) = -9999.00 SUBFILES(37) = -9999.00 SUBFILES(39) = -9999.00 SUBFILES( 41 ) = -9999.00 SUBFILES( 43)--9999.00 SUBFILES(45) =-9999.00 SUBFILES( 47) -- -9999.00 SUBFILES(49) =-9999.00 SUBFILES( 51) = -9999.00 SUBFILES(53) =-9999.00 SUBFILES(55) =-9999.00 SUBFILES(57) =-9999.00 SUBFILES(59) =-9999.00 SUBFILES( 61) -- -9999.00 SUBFILES(63) =-9999.00 SUBFILES(65) =-9999.00 = 0.000000E+00 SUBFILES( 2) =-9999.00 =-9999.00 SUBFILES( 4) =-9999.00 SUBFILES( 6)=-9999.00 SUBFILES( 8) =-9999.00 SUBFILES(10) = -9999.00 SUBFILES(12)---9999.00 SUBFILES(14) =-9999.00 SUBFILES(16) = -9999.00 SUBFILES(18)---9999.00 SUBFILES(20) =-9999.00 SUBFILES(22) =-9999.00 SUBFILES(24) =-9999.00 SUBFILES(26) =-9999.00 SUBFILES(28) =-9999.00 SUBFILES(30) =-9999.00 SUBFILES(32) =-9999.00 SUBFILES(34) = -9999.00 SUBFILES(36) = -9999.00 SUBFILES( 38) = -9999.00 SUBFILES(40) =-9999.00 SUBFILES(42) =-9999.00 SUBFILES(44) =-9999.00 SUBFILES(46) =-9999.00 SUBFILES(48) = -9999.00 SUBFILES(50) = -9999.00 SUBFILES(52) = -9999.00 SUBFILES(54) = -9999.00 SUBFILES(56) = -9999.00 SUBFILES(58) =-9999.00 SUBFILES(60) =-9999.00 SUBFILES(62) =-9999.00 SUBFILES(64) =-9999.00 SUBFILES(66) =-9999.00 SUBFILES(67) =-9999.00 SUBFILES(69) =-9999.00 SUBFILES( 71) -- -9999.00 SUBFILES( 73) -- -9999.00 SUBFILES( 75) --- -9999.00 SUBFILES(77) =-9999.00 SUBFILES( 79)--9999.00 SUBFILES( 81) -- -9999.00 SUBFILES(83) =-9999.00 SUBFILES(85) =-9999.00 SUBFILES(87) =-9999.00 SUBFILES(89) =-9999.00 SUBFILES( 91) = -9999.00 SUBFILES(93) =-9999.00 SUBFILES(95) =-9999.00 SUBFILES(97) =-9999.00 SUBFILES(99) =-9999.00 SUBFILES(101) = -9999.00 SUBFILES(103) = -9999.00 SUBFILES(105) = -9999.00 SUBFILES(107) = -9999.00 SUBFILES(109) = -9999.00 SUBFILES(111) = -9999.00 SUBFILES(113) = -9999.00 SUBFILES(115) = -9999.00 SUBF1LES(117) = -9999.00 SUBFILES(119) = -9999.00 SUBFILES(121) = -9999.00 SUBFILES(123) = -9999.00 SUBFILES(125) = -9999.00 SUBFILES(127) = -9999.00 SUBFILES(68) = -9999.00 SUBFILES(70) =-9999.00 SUBFILES(72) =-9999.00 SUBFILES(74) =-9999.00 SUBFILES(76) =-9999.00 SUBFILES(78) =-9999.00 SUBFILES(80) =-9999.00 SUBFILES(82) =-9999.00 SUBFILES(84) =-9999.00 SUBFILES(86) =-9999.00 SUBFILES(88) =-9999.00 SUBFILES(90) =-9999.00 SUBFILES(92) =-9999.00 SUBFILES(94) =-9999.00 SUBFILES(96) =-9999.00 SUBFILES(98) =-9999.00 SUBFILES(100) = -9999.00 SUBFILES(102) = -9999.00 SUBFILES(104) = -9999.00 SUBFILES(106) = -9999.00 SUBFILES(108) = -9999.00 SUBFILES(110) = -9999.00 SUBFILES(112) = -9999.00 SUBFILES(114) = -9999.00 SUBFILES(116) = -9999.00 SUBFILES(118) = -9999.00 SUBFILES(120) = -9999.00 SUBFILES(122) = -9999.00 SUBFILES(124) = -9999.00 SUBFILES(126) = -9999.00 SUBFILES(128) = -9999.00 !-- STRING PARAMETERS ............................................ INTERPOL= YES Input Tape Device, LU (1) is: TAPEC: Output Tape-Image file, LU (2) is: CSDATA\1443~IORIZ~1443.TAP (Output Tape-Image file will be created) Listing Method ("LISTMETH") = 0, Depth Unit oriented listing. Listing Frequency ("LISTFREQ") is every ( 50) units of Depth. Listing output limiting (LISTMAX) not enabled... (to enable list limiting set LISTMAX positive) Data Statistics reporting ("STATS") has not been enabled. (Specify STATS=I to enable this feature) Automatic curve renaming has been disabled by user input (AUTOCURV=0). Automatic "FILE=n" card generation is disabled. (This is the program default, AUTOFILE=0) (Specify AUTOFILE=I to enable this feature) LIS comment record decoding (COMMENTS=l) has been enabled by user input. LIS information record decoding (INFORECS=I) has been enabled by user input. The WRITEASC option has not been enabled... (to write ASCII subfiles specify WRITEASC=I) Tape Subtile 1 is type: LIS **** REEL HEADER **** MWD 95/8/9 01 **** TAPE HEADER **** MWD 95/8/9 1443 O1 Tape Subtile: 1 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subtile 2 is type: LIS LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS # WELL NAME: APl NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA MWD RUN 5 JOB NUMBER: 1443 LOGGING ENGINEER: OPERATOR WITNESS: X-30 Horizontal 500292255000 BP Exploration (Alaska) Inc. BAKER HUGHES INTEQ 9 AUG 95 MWD RUN MWD RUN 8 1443 1443 SUTHERLAND J. BURTON M. WHITELY M. WHITELY SUTHERLAND D. MASKELL MWD RUN 9 JOB NUMBER: 1443 LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: 7 TOWNSHIP: 10N RANGE: 14E FNL: FSL: 4722 FEL: 876 FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 5 J. BURTON D. MASKELL 70.10 69.10 39.00 MWD RUN 6 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.500 10.750 3276.0 2ND STRING 9.875 7.625 11627.0 3RD STRING 6.750 PRODUCTION STRING # REMARKS: DATA HAS BEEN DEPTH SHIFTED TO WIRELINE DATA AT CUSTOMER REQUEST. **** FILE HEADER **** MWD .001 1024 LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged.. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH MWD 10870.0 13043.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD 5 MWD 7 MWD 8 MWD 9 $ BIT RUN NO MERGE TOP MERGE BASE 10870.0 11580.0 11345.0 11934.0 11928.0 12743.0 12742.0 13043.0 CN : BP Exploration (Alaska) WN : X~30 Horizontal FN : Prudhoe Bay COUN :North Slope STAT :Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS EDITED MERGED MWD DATA THAT HAS BEEN DEPTH SHIFTED TO WIREL1NE DATA. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 910111213141516 000 1 0000000 1 000 1 Rep Code Count Bytes 68 4 16 Sum: 4 16 16 fndun a [F ] 1.00000000 3 ONE DEPTH PEK FRAME Tape depth ID: F 4 Curves: API APl APl API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 GAPI 4 4 98 660 71 6 2 RA MWD 68 1 OHMM 4 4 98 660 71 6 3 ROP MWD 68 1 FPHR 4 4 98 660 71 6 4 RP MWD 68 I OHMM 4 4 98 660 71 6 16 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 50 FRAMES * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 87 Tape File Start Depth = 10870.000000 Tape File End Depth -- 13043.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4876 datums Tape Subtile: 2 169 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subtile 3 is type: LIS **** FILE HEADER **** MWD .002 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .2500 # FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 10870.0 11580.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): 24 APR 95 STOP DEPTH M1.34 M1.34 MEMORY TD DRILLER (FT): .0 TOP LOG INTERVAL (FT): 10870.0 BOTTOM LOG INTERVAL (FT): 11580.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 53.7 MAXIMUM ANGLE: 60.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE MWD DUAL PROPAGATION $ TOOL NUMBER 6198-03 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.625 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.10 MUD VISCOSITY (S): .0 MUD PH: .0 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 CN : BP Exploration (Alaska) WN : X-30 Horizontal FN : Prudhoe Bay COUN : North Slope STAT :Alaska .000 .0 .000 .0 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 5. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 910111213141516 000 1 0000000 1 000 1 Rep Code Count Bytes 68 18 72 Sum: ' 18 72 72 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 AZT MWD 68 1 DEG 4 4 98 660 71 6 2 DCCMMWD 68 1 4 4 98 660 71 6 3 GRAMMWD 68 1 GAPI 4 4 98 660 71 6 4 GRAXMWD 68 1 GAPI 4 4 98 660 71 6 5 1NC MWD 68 1 DEG 4 4 98 660 71 6 6 PDCMMWD 68 1 DEG 4 4 98 660 71 6 7 PDDCMWD 68 1 DEG 4 4 98 660 71 6 8 PDEMMWD 68 1 MINS 4 4 98 660 71 6 9 PD1MMWD 68 1 PTFT 4 4 98 660 71 6 10 RACMMWD 68 1 OHMM 4 4 98 660 71 6 11 RADEMWD 68 I OHMM 4 4 98 660 71 6 12 ROPSMWD 68 1 FPHR 4 4 98 660 71 6 13 RPCMMWD 68 1 OHMM 4 4 98 660 71 6 14 RPDEMWD 68 1 OHMM 4 4 98 660 71 6 15 STVD MWD 68 1 FT 4 4 98 660 71 6 16 TCDMMWD 68 1 DEGF 4 4 98 660 71 6 17 TCDXMWD 68 1 DEGF 4 4 98 660 71 6 18 WBCSMWD 68 1 LB 4 4 98 660 71 6 72 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 13 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 219 Tape File Start Depth = 10870.000000 Tape File End Depth = 11580.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7054 datums Tape Subtile: 3 283 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subtile 4 is type: LIS **** FILE HEADER **** MWD .003 1024 LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .2500 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 11345.0 11934.0 $ LOG HEADER DATA DATE LOGGED: 04 MAY 95 SOFTWARE SURFACE SOFTWARE VERSION: M1.34 DOWNHOLE SOFTWARE VERSION: M1.34 DATA TYPE (MEMORY OR REAL-TIME): REAL-TIME TD DRILLER (FT): .0 TOP LOG INTERVAL (FT): 11345.0 BOTTOM LOG INTERVAL (FT): 11934.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 53.7 MAXIMUM ANGLE: 83.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER MWD NAVIGAMMA 1418 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): .0 BOREHOLE CONDITIONS MUD TYPE: PRO-FLO MUD DENSITY (LB/G): 9.40 MUD VISCOSITY (S): .0 MUD PH: .0 MUD CHLORIDES (PPM): 34000 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TEMPERATURE: .000 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: THE INTERVAL FROM 11570 TO 11627 FT MD (8825 TO 8853 FT SSTVD) WAS LOGGED BEHIND CASING. $ CN : BP Exploration (Alaska) WN : X-30 Horizontal FN : Prudhoe Bay COUN :North Slope STAT :Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 7. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(l) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. · Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213141516 000 1 0000000 1 000 1 Rep Code Count Bytes 68 18 72 Sum: 18 72 72 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 AZT MWD 68 1 DEG 4 4 98 660 71 6 2 DCCMMWD 68 1 4 4 98 660 71 6 3 GRAMMWD 68 1 GAPI 4 4 98 660 71 6 4 GRAXMWD 68 1 GAPI 4 4 98 660 71 6 5 INC MWD 68 1 DEG 4 4 98 660 71 6 6 PDCMMWD 68 1 DEG 4 4 98 660 71 6 7 PDDCMWD 68 1 DEG 4 4 98 660 71 6 8 PDEMMWD 68 1 MINS 4 4 98 660 71 6 9 PDIMMWD 68 1 PTFT 4 4 98 660 71 6 10 RACM MWD 68 1 OHMM 4 4 98 660 71 6 11 RADEMWD 68 1 OHMM 4 4 98 660 71 6 12 ROPSMWD 68 1 FPHR 4 4 98 660 71 6 13 RPCMMWD 68 1 OHMM 4 4 98 660 71 6 14 RPDEMWD 68 1 OHMM 4 4 98 660 71 6 15 STVDMWD 68 1 FT 4 4 98 660 71 6 16 TCDMMWD 68 1 DEGF 4 4 98 660 71 6 17 TCDXMWD 68 1 DEGF 4 4 98 660 71 6 18 WBCSMWD 68 1 LB 4 4 98 660 71 6 72 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 13 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 182 Tape File Start Depth = 11345.000000 Tape File End Depth = 11934.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10744 datums Tape Subtile: 4 247 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subtile 5 is type: LIS **** FILE HEADER **** MWD .004 1024 LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit mn in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 11928.0 12743.0 $ LOG HEADER DATA DATE LOGGED: 06 MAY 95 SOFTWARE SURFACE SOFTWARE VERSION: M 1.34 DOWNHOLE SOFTWARE VERSION: M1.34 DATA TYPE (MEMORY OR REAL-TIME): REAL-TIME TD DRILLER (FT): .0 TOP LOG INTERVAL (FT): 11928.0 BOTTOM LOG INTERVAL (FT): 12743.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 84.3 MAXIMUM ANGLE: 92.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER MWD NAVIGAMMA 1418 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): .0 BOREHOLE CONDITIONS MUD TYPE: PRO-FLO MUD DENSITY (LB/G): 9.40 MUD VISCOSITY (S): .0 MUD PH: .0 MUD CHLORIDES (PPM): 40000 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: $ CN : BP Exploration (Alaska) WN : X-30 Horizontal FN · Prudhoe Bay COUN :North Slope STAT :Alaska .000 .0 .000 .0 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 8. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 12 13 14 15 16 000 1 0000000 1 000 1 Rep Code Count Bytes 68 18 72 Sum: 18 72 72 fndun a IF ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 AZT MWD 68 1 DEG 4 4 98 660 71 6 2 DCCMMWD 68 1 4 4 98 660 71 6 3 GRAMMWD 68 1 GAPI 4 4 98 660 71 6 4 GRAXMWD 68 1 GAPI 4 4 98 660 71 6 5 INC MWD 68 1 DEG 4 4 98 660 71 6 6 PDCMMWD 68 1 DEG 4 4 98 660 71 6 7 PDDCMWD 68 1 DEG 4 4 98 660 71 6 8 PDEMMWD 68 1 MINS 4 4 98 660 71 6 9 PDIMMWD 68 1 PTFT 4 4 98 660 71 6 10 RACMMWD 68 1 OHMM 4 4 98 660 71 6 11 RADEMWD 68 1 OHMM 4 4 98 660 71 6 12 ROPSMWD 68 1 FPHR 4 4 98 660 71 6 13 RPCMMWD 68 1 OHMM 4 4 98 660 71 6 14 RPDEMWD 68 1 OHMM 4 4 98 660 71 6 15 STVDMWD 68 1 FT 4 4 98 660 71 6 16 TCDMMWD 68 1 DEGF 4 4 98 660 71 6 17 TCDXMWD 68 1 DEGF 4 4 98 660 71 6 18 WBCSMWD 68 1 LB 4 4 98 660 71 6 72 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 13 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 251 Tape File Start Depth = 11928.000000 Tape File End Depth = 12743.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15140 datums Tape Subfile: 5 315 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 6 is type: LIS **** FILE HEADER **** MWD .005 1024 LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit nm in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 12742.0 13043.0 $ LOG HEADER DATA DATE LOGGED: 07 MAY 95 SOFTWARE SURFACE SOFTWARE VERSION: M 1.34 DOWNHOLE SOFTWARE VERSION: M 1.34 DATA TYPE (MEMORY OR REAL-TIME): REAL-TIME TD DRILLER (FT): .0 TOP LOG INTERVAL (FT): 12742.0 BOTTOM LOG INTERVAL (FT): 13043.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 85.6 MAXIMUM ANGLE: 85.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER MWD NAVIGAMMA 1418 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): .0 BOREHOLE CONDITIONS MUD TYPE: PRO-FLO MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S): .0 MUD PH: .0 MUD CHLORIDES (PPM): 38000 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: $ CN : BP Exploration (Alaska) Wix[ : X-30 Horizontal FN : Prudhoe Bay COUN :North Slope STAT :Alaska .000 .0 .000 .0 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 9. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 910111213141516 000 1 0000000 I 000 1 Rep Code Count Bytes 68 18 72 Sum: 18 72 72 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 AZT MWD 68 1 DEG 4 4 98 660 71 6 2 DCCMMWD 68 1 4 4 98 660 71 6 3 GRAMMWD 68 1 GAPI 4 4 98 660 71 6 4 GRAXMWD 68 1 GAPI 4 4 98 660 71 6 5 INC MWD 68 1 DEG 4 4 98 660 71 6 6 PDCMMWD 68 1 DEG 4 4 98 660 71 6 7 PDDCMWD 68 1 DEG 4 4 98 660 71 6 8 PDEMMWD 68 1 MINS 4 4 98 660 71 6 9 PDIMMWD 68 1 PTFT 4 4 98 660 71 6 10 RACMMWD 68 1 OHMM 4 4 98 660 71 6 11 RADEMWD 68 1 OHMM 4 4 98 660 71 6 12 ROPSMWD 68 1 FPHR 4 4 98 660 71 6 13 RPCMMWD 68 1 OHMM 4 4 98 660 71 6 14 RPDEMWD 68 1 OHMM 4 4 98 660 71 6 15 STVD MWD 68 1 FT 4 4 98 660 71 6 16 TCDMMWD 68 1 DEGF 4 4 98 660 71 6 17 TCDXMWD 68 1 DEGF 4 4 98 660 71 6 18 WBCSMWD 68 1 LB 4 4 98 660 71 6 72 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 13 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 93 Tape File Start Depth = 12742.000000 Tape File End Depth = 13043.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet ** ** FILE TRAILER ** ** LIS representation code decoding summary: Rep Code: 68 13768 datums Tape Subtile: 6 157 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subtile 7 is type: LIS **** TAPE TRAILER **** MWD 95/8/9 1443 O1 **** REEL TRAILER **** MWD 95/8/9 01 Tape Subtile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 9 AUG 95 3:28p Elapsed execution time -- 55.59 seconds. SYSTEM RETURN CODE = 0 Tape Subtile 1 is type: LIS Tape Subtile 2 is type: LIS DEPTH GR RA ROP RP 10870.0000 -999.2500 3.4750 -999.2500 3.0724 10870.5000 -999.2500 3.4759 -999.2500 3.0973 10900.0000 -999.2500 3.1621 -999.2500 3.0631 10950.0000 -999.2500 3.7156 96.7656 3.6062 11000.0000 -999.2500 3.5687 91.1422 3.9240 11050.0000 -999.2500 3.5215 89.4740 3.7644 11100.0000 -999.2500 6.9665 76.3407 3.9531 11150.0000 -999.2500 2.7515 63.2672 2.7777 11200.0000 -999.2500 3.0917 35.4010 2.6765 11250.0000 -999.2500 3.8032 40.7646 2.3343 11300.0000 -999.2500 5.3104 27.3578 2.9693 11350.0000 -999.2500 4.2747 30.8055 3.9298 11400.0000 -999.2500 3.7502 19.5695 4.0380 11450.0000 -999.2500 6.9240 36.2145 6.2705 11500.0000 -999.2500 4.5935 40.4576 5.1188 11550.0000 -999.2500 4.8923 41.4847 5.0915 11600.0000 95.4752 -999.2500 27.9967 -999.2500 11650.0000 46.8639 -999.2500 28.5647 -999.2500 11700.0000 381.9550 -999.2500 16.0458 -999.2500 11750.0000 69.4446 -999.2500 31.3988 -999.2500 11800.0000 76.3170 -999.2500 11.7709 -999.2500 11850.0000 130.5137 -999.2500 26.2218 -999.2500 11900.0000 498.9699 -999.2500 23.8367 -999.2500 11950.0000 41.9550 -999.2500 66.0856 -999.2500 12000.0000 57.6634 -999.2500 100.9070 -999.2500 12050.0000 43.4277 -999.2500 30.8036 -999.2500 12100.0000 42.8141 -999.2500 78.6464 -999.2500 12150.0000 69.9355 -999.2500 87.9514 -999.2500 12200.0000 78.2806 -999.2500 38.9791 -999.2500 12250.0000 49.3183 -999.2500 26.5000 -999.2500 12300.0000 47.8456 -999.2500 37.8024 -999.2500 12350.0000 55.6998 -999.2500 40.5969 -999.2500 12400.0000 127.0419 -999.2500 14.1745 -999.2500 12450.0000 41.6687 -999.2500 40.5738 -999.2500 12500.0000 49.3183 -999.2500 60.3636 -999.2500 12550.0000 33.7327 -999.2500 86.2999 -999.2500 12600.0000 34.5917 -999.2500 55.0708 -999.2500 12650.0000 35.5735 -999.2500 75.1015 -999.2500 12700.0000 44.9003 -999.2500 72.4934 -999.2500 12750.0000 33.2418 -999.2500 71.9266 -999.2500 12800.0000 30.1737 -999.2500 95.8737 -999.2500 12850.0000 31.9737 -999.2500 97.8331 -999.2500 12900.0000 31.6464 -999.2500 32.1313 -999.2500 12950.0000 32.3827 -999.2500 50.8946 -999.2500 13000.0000 -999.2500 -999.2500 19.5825 -999.2500 13043.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10870.000000 Tape File End Depth = 13043.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet Tape Subtile 3 is type: LIS DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RI'DE STVD TCDM TCDX WBCS 10870.0000 -999.2500 128.3990 -999.2500 13.6374 13.3461 4.2499 3.9323 -999.2500 -999.2500 -999.2500 -999.2500 10870.2500 -999.2500 128.2909 -999.2500 13.6225 13.3312 4.2244 3.9112 -999.2500 -999.2500 -999.2500 -999.2500 10900.0000 -999.2500 132.9563 -999.2500 14.2646 13.9701 3.4720 3.2567 -999.2500 -999.2500 -999.2500 -999.2500 10950.0000 -999.2500 130.3183 -999.2500 13.9016 13.6081 3.6591 3.4233 119.1109 -999.2500 141.9125 -999.2500 11000.0000 -999.2500 124.4303 -999.2500 13.0917 12.8025 3.7863 3.5436 107.5738 -999.2500 135.5000 -999.2500 11050.0000 -999.2500 4.0038 -999.2500 -999.2500 113.8768 11.6430 11.3612 3.7526 105.9458 135.5000 -999.2500 11100.0000 -999.2500 119.7704 -999.2500 12.4624 12.1759 3.7117 3.4873 94.7199 -999.2500 137.3000 -999.2500 11150.0000 -999.2500 127.2020 -999.2500 13.4742 1'3.1833 3.9703 3.6962 83.4528 -999.2500 140.0000 -999.2500 11200.0000 -999.2500 173.6279 -999.2500 19.8649 19.5480 2.3728 2.2472 46.8202 -999.2500 144.5675 -999.2500 143.7122 -999.2500 0.0000 9.6667 3.1347 3.2472 -999.2500 138.0464 -999.2500 0.0000 10.0000 3.1403 3.2531 -999.2500 150.2998 -999.2500 16.5000 146.3333 2.9127 3.0144 -999.2500 154.4295 -999.2500 84.1667 403.3333 3.0382 3.1462 0.0000 129.8322 -999.2500 55.0000 660.3333 3.3494 3.4729 0.0000 165.3455 -999.2500 47.0000 919.3334 4.0407 4.2005 0.0000 154.2849 -999.2500 51.0000 1169.3333 3.6308 3.7637 0.0000 150.2365 -999.2500 75.7500 1472.7500 3.1972 3.3124 0.0000 157.0642 -999.2500 87.3333 1784.3333 1.6673 1.7131 23.6374 DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCDX WBCS 11250.0000 -999.2500 145.1462 -999.2500 15.9526 15.6502 4.2964 3.9333 41.0891 -999.2500 147.2000 -999.2500 11300.0000 -999.2500 133.6146 -999.2500 14.3559 14.0586 7.6727 6.5694 31.4420 -999.2500 148.7750 -999.2500 11350.0000 -999.2500 112.5009 -999.2500 11.4554 11.1747 5.3813 4.9209 26.4956 -999.2500 151.0250 -999.2500 11400.0000 -999.2500 119.3693 -999.2500 12.3988 12.1143 3.9921 3.7311 65.4040 -999.2500 153.2750 -999.2500 11450.0000 -999.2500 85.3436 -999.2500 7.7659 7.5190 15.6591 12.4294 72.1385 -999.2500 153.9500 -999.2500 11500.0000 -999.2500 101.5563 -999.2500 9.9567 9.6891 4.7380 4.4167 35.8054 -999.2500 155.5250 -999.2500 11550.0000 -999.2500 90.1801 -999.2500 8.4128 8.1582 6.9013 6.2616 46.0683 -999.2500 152.3750 -999.2500 11580.0000 -999.2500 100.7779 -999.2500 9.8548 9.5877 6.0010 5.4764 34.9214 -999.2500 153.9500 -999.2500 157.4416 -999.2500 95.6667 2114.3330 2.4229 2.4989 23.7176 161.6948 -999.2500 96.3333 2452.3330 2.8826 2.9834 66.4480 146.3906 -999.2500 96.0000 2792.3330 4.1464 4.3114 28.0227 155.0511 -999.2500 96.6250 3110.8750 3.6567 3.7942 32.3278 155.2337 -999.2500 85.0000 3448.3330 7.5009 7.8599 27.3542 147.9467 -999.2500 131.0000 3774.0000 5.1573 5.3788 32.1473 153.6776 -999.2500 100.0000 4114.7500 6.6574 6.9702 66.2875 148.8630 -999.2500 176.5000 4310.3330 5.2429 5.4660 27.6684 Tape File Start Depth = 10870.000000 Tape File EndDepth = 11580.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 4 is type: LIS DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCDX WBCS 11345.0000 -999.2500 120.8263 -999.2500 12.5968 12.3111 4.1148 3.8339 20.8997 -999.2500 150.5750 -999.2500 11345.2500 -999.2500 113.4460 -999.2500 11.5978 11.3184 4.2220 3.9404 20.8997 -999.2500 150.5750 -999.2500 11350.0000 -999.2500 112.5009 -999.2500 11.4554 11.1747 5.3813 4.9209 26.4956 -999.2500 151.0250 -999.2500 11400.0000 -999.2500 119.3693 -999.2500 12.3988 12.1143 3.9921 3.7311 65.4040 -999.2500 153.2750 -999.2500 11450.0000 -999.2500 85.3436 -999.2500 7.7659 7.5190 15.6591 12.4294 72.1385 -999.2500 153.9500 -999.2500 11500.0000 -999.2500 101.5563 -999.2500 9.9567 9.6891 4.7380 4.4167 35.8054 -999.2500 155.5250 -999.2500 11550.0000 -999.2500 90.1801 -999.2500 8.4128 8.1582 6.9013 6.2616 46.0683 -999.2500 152.3750 -999.2500 157.5742 -999.2500 97.0000 2756.3330 3.5640 3.6979 27.9559 160.7911 -999.2500 96.5000 2758.7500 4.0733 4.2255 27.8623 146.3906 -999.2500 96.0000 2792.3330 4.1464 4.3114 28.0227 155.0511 -999.2500 96.6250 3110.8750 3.6567 3.7942 32.3278 155.2337 -999.2500 85.0000 3448.3330 7.5009 7.8599 27.3542 147.9467 -999.2500 131.0000 3774.0000 5.1573 5.3788 32.1473 153.6776 -999.2500 100.0000 4114.7500 6.6574 6.9702 66.2875 11650.0000 -999.2500 -999.2500 -999.2500 35.0826 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 4.1296 -999.2500 -999.2500 -999.2500 -999.2500 129.9200 20.1671 11600.0000 -999.2500 -999.2500 -999.2500 74.8049 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 24.3605 -999.2500 -999.2500 -999.2500 156.6500 -999.2500 27.7286 DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCDX WBCS 11700.0000 -999.2500 -999.2500 -999.2500 161.4857 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 29.4090 -999.2500 -999.2500 -999.2500 -999.2500 136.0398 34.6097 11750.0000 186.4000 -999.2500 -999.2500 119.0241 72.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 15.1589 -999.2500 -999.2500 8904.5527 -999.2500 -999.2500 37.2845 11800.0000 -999.2500 -999.2500 -999.2500 98.4069 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 21.7536 -999.2500 -999.2500 -999.2500 -999.2500 123.9800 35.4941 11850.0000 -999.2500 -999.2500 -999.2500 95.4616 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 25.8513 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 33.5379 11900.0000 -999.2500 -999.2500 -999.2500 300.0628 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 67.9291 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 28.3306 11934.0000 -999.2500 -999.2500 -999.2500 53.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 50.9847 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 11.5100 Tape File Start Depth = 11345.000000 Tape File End Depth = 11934.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 5 is type: LIS DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCDX WBCS 11928.0000 -999.2500 -999.2500 -999.2500 110.5563 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 48.7015 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 16.1897 11928.2500 -999.2500 -999.2500 -999.2500 108.7155 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 54.7818 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 16.1043 11950.0000 -999.2500 -999.2500 -999.2500 59.3464 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 36.1582 -999.2500 -999.2500 -999.2500 -999.2500 129.9200 14.7717 12000.0000 -999.2500 -999.2500 -999.2500 48.3365 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 94.3746 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 27.9180 12050.0000 -999.2500 -999.2500 -999.2500 45.8821 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 65.6168 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 28.8238 12100.0000 -999.2500 -999.2500 -999.2500 38.5188 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 57.2886 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 29.1084 12150.0000 -999.2500 -999.2500 -999.2500 36.0644 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 83.2898 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 18.1409 12200.0000 -999.2500 -999.2500 -999.2500 73.9172 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 46.2401 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 43.5284 12250.0000 -999.2500 -999.2500 -999.2500 58.4488 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 54.4344 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 60.8691 DEPTH INC RACM STVD 12300.0000 -999.2500 -999.2500 -999.2500 12350.0000 -999.2500 -999.2500 -999.2500 12400.0000 -999.2500 -999.2500 -999.2500 12450.0000 -999.2500 -999.2500 -999.2500 12500.0000 -999.2500 -999.2500 -999.2500 12550.0000 -999.2500 -999.2500 -999.2500 12600.0000 -999.2500 -999.2500 -999.2500 12650.0000 -999.2500 -999.2500 -999.2500 12700.0000 -999.2500 -999.2500 -999.2500 12743.0000 -999.2500 -999.2500 -999.2500 AZT PDCM RADE TCDM DCCM PDDC ROPS TCDX -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 31.1731 -999.2500 -999.2500 -999.2500 -999.250O -999.2500 -999.2500 -999.2500 63.1250 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 24.5990 138.0200 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 33.5768 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 26.6093 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 86.4642 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 68.9273 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 67.0750 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 37.9481 -999.2500 -999.2500 -999.2500 -999.25OO -999.2500 -999.2500 -999.2500 64.8694 -999.2500 GRAM PDEM RPCM WBCS -999.2500 -999.2500 -999.2500 65.0143 -999.2500 -999.2500 -999.2500 52.1161 -999.2500 -999.2500 -999.2500 60.5536 -999.2500 -999.2500 -999.2500 15.3691 -999.25O0 -999.2500 -999.2500 54.9911 -999.2500 -999.2500 -999.2500 28.5714 -999.2500 -999.2500 -999.2500 0.0000 -999.2500 -999.2500 -999.2500 30.5357 -999.2500 -999.25OO -999.2500 53.4286 -999.2500 e-999.2500 -999.2500 21.8839 GRAX PDIM RPDE 52.7545 -999.2500 -999.2500 53.2454 -999.2500 -999.2500 104.7884 -999.2500 -999.2500 45.1458 -999.2500 -999.2500 59.1360 -999.2500 -999.2500 34.1008 -999.2500 -999.25O0 34.1008 -999.2500 -999.2500 32.5668 -999.2500 -999.2500 42.4459 -999.2500 -999.2500 30.3607 -999.2500 -999.2500 Tape File Start Depth = 11928.000000 Tape File End Depth = 12743.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 6 is type: LIS DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCDX WBCS 12742.0000 -999.2500 -999.2500 -999.2500 30.6319 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 65.4002 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 22.3661 12742.2500 -999.2500 -999.2500 -999.2500 30.5010 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 64.9595 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 22.1964 12750.0000 -999.2500 -999.2500 -999.2500 32.1373 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 72.9191 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 22.4554 12800.0000 -999.2500 -999.2500 -999.2500 30.6646 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 93.6663 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 42.5546 12850.0000 -999.2500 -999.2500 -999.2500 32.0555 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 103.2312 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 36.3936 12900.0000 -999.2500 -999.2500 -999.2500 32.5668 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 35.5133 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 38.4074 12950.0000 -999.2500 -999.2500 -999.2500 30.1737 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 39.7962 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 13.6152 13000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 44.0848 -999.2500 -999.2500 -999.2500 -999.2500 143.9600 37.9568 13043.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 32.4594 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 36.4454 Tape File Start Depth = 12742.000000 Tape File End Depth = 13043.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 7 is type: LIS LIS VERIFICATION LISTING FOR: BP EXPLORATION AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE TCDM TCDX STVD WBCS Note: BELOW ARE THE MNEMONICS THAT CAN BE FOUND ON THE LIS TAPE GENERATED FOR BP EXPLORATION X-30 PILOT HOLE Azimuth - Tree (Posted) Calculated Dielectric Constant Gamma Ray Memory (API) [RWD] Gamma Ray (API) [MWD] Inclination - Tree (Posted) Phase Difference Borehole Corrected [RWD] Phase Difference Dielectric Corrected [RWD] Phase Difference Elapsed Time [RWD] Phase Difference Data Density Integrated [RWD] Resistivity (AT) Borehole Corrected [RWD] Resistivity (AT) Corrected Dielectric Effect [RWD] Rate of Penetration Resistivity (PD) Borehole Corrected [RWD] Resistivity (PD) Corrected for Dielectric Effect [RWD] CDS Temperature [RWD] CDS Temperature [MWD] Subsea Tree Vertical Depth Surface Weight On Bit AT is Attenuation PD is Phase Difference MWD is Measurement While Drilling RWD is Recorded While Drilling deg MWD-API MWD-API deg deg deg mins pt/t~ ohm-m ohm-m deg F deg F klbs Copyright 1987,1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. All rights reserved. PROGRAM: TAPESCAN REVISION: 2.64 Start of execution: Wed 9 AUG 95 3:06p ~--=- ECHOING INPUT PARAMETERS INPUT PARAMETER FILE: TAPESCAN.INP 1 2 3 4 5 6 7 123456789012345678901234567890123456789012345678901234567890123456789012 1 AUTOCURV = 0 , ! Automatic Curve renaming: 0=OFF, I=ON 2 AUTOFILE = 0 , ! Automatic FILE= generation: 0=OFF, I=ON 3 COMMENTS = I , ! Decode LIS Comment records: 0=OFF, I=ON 4 INFORECS = I , ! Decode LIS Information records: 0=NO, I=YES 5 LISTMETHOD = 0 , ! Listing Method: 0=depth units 1--tape units 6 LISTFREQ = 50, ! Listing Frequency: Every n units 7 LISTMAX = 0 , ! Listing Maximum (O--no limit, value=list limit) 8 STATS = 0 , ! Statistics generation: 0=OFF, I=ON 9 FORCETYP = 0 , ! (I=BIT,2=LIS ... thru 35=Array Accoustic) (see table) I0 WRITEASCII = 0 , ! If 1, all ascii files will be written (file0001.dat, etc.) I1 WRITETAP = I , !Write Tape-Image File: 0=NO, I=YES 12 SPLITLIS = 1 , ! If 1 and WRITETAP on, split LIS logical files to physical 13 SUBFILES =/0/, ! Tape Subtile write selection (WRITETAP must be on) 14 INTERPOLATE='YES' ! Set up for TAPE2WDS to interpolate datums ('YES'or'NO') 15 END ~--= USER INPUT PARAMETERS AUTOCURV = 0, AUTOFILE = 0, COMMENTS = I , INFORECS = 1 , LISTMETHOD = 0 , LISTFREQ = 50, LISTMAX = 0 , STATS = 0 , FORCETYP = 0 , WRITEASCII = 0 , WRITETAP = 1 , SPLITLIS = 1 , SUBFILES =/0/, INTERPOLATE='YES' END !-- PROCESSING INTERVAL FROM 0.000 TO 0.000 ............. !-- CONSTANT PARAMETERS ........................................... AUTOCURV= 0.000000E+00 AUTOFILE= 0.000000E+00 COMMENTS= 1.00000 FORCETYP= 0.000000E+00 INFORECS- 1.00000 LISTFREQ= 50.0000 LISTMAX = 0.000000E+00 LISTMETH= 0.000000E+00 SELFTEST= 0.000000E+00 SPLITLIS= 1.00000 STATS = 0.000000E+00 WRITEASC= 0.000000E+00 WRITETAP= 1.00000 dpcoef = 1.00000 dpcte = 1.00000 drlength= 0.000000E+00 listwave= 0.000000E+00 maxrecln= 0.000000E+00 minrecln= 0.000000E+00 nsamples= 0.000000E+00 numcurvs= 0.000000E+00 numdatar= 0.000000E+00 numrecfl= 0.000000E+00 tfendep = 0.000000E+00 tflevsp = 0.000000E+00 tfstdep = 0.000000E+00 wcrbot = 0.000000E+00 wcrlevsp= 0.000000E+00 wcrtop = 0.000000E+00 !-- ARRAY PARAMETERS .............................................. SUBFILES(1) SUBFILES(3) SUBFILES(5) =-9999.00 SUBFILES(7) =-9999.00 SUBFILES(9) =-9999.00 SUBFILES(11) = -9999.00 SUBFILES(13) =-9999.00 SUBFILES(15) =-9999.00 SUBFILES(17) =-9999.00 SUBFILES(19) =-9999.00 SUBFILES( 21) = -9999.00 SUBFILES(23) = -9999.00 SUBFILES(25) = -9999.00 SUBFILES(27) -- -9999.00 SUBFILES(29) = -9999.00 SUBFILES( 31) = -9999.00 SUBFILES(33) = -9999.00 SUBFILES(35) = -9999.00 SUBFILES(37) = -9999.00 SUBFILES(39) = -9999.00 SUBFILES( 41 ) = -9999.00 SUBFILES(43) = -9999.00 SUBFILES(45) = -9999.00 SUBFILES(47) = -9999.00 SUBFILES(49) = -9999.00 SUBFILES( 51) = -9999.00 SUBFILES(53) = -9999.00 SUBFILES(55) =-9999.00 SUBFILES(57) = -9999.00 SUBFILES(59) = -9999.00 SUBFILES( 61) = -9999.00 SUBFILES(63) = -9999.00 SUBFILES(65) = -9999.00 = 0.000000E+00 SUBFILES( 2) = -9999.00 =-9999.00 SUBFILES( 4) =-9999.00 SUBFILES( 6) =-9999.00 SUBFILES( 8) =-9999.00 SUBFILES(10) =-9999.00 SUBFILES(12) =-9999.00 SUBFILES(14) =-9999.00 SUBFILES(16) =-9999.00 SUBFILES(18) =-9999.00 SUBFILES(20) = -9999.00 SUBFILES(22) = -9999.00 SUBFILES(24) = -9999.00 SUBFILES(26) = -9999.00 SUBFILES(28) = -9999.00 SUBFILES(30) = -9999.00 SUBFILES(32) = -9999.00 SUBFILES(34) = -9999.00 SUBFILES(36) = -9999.00 SUBFILES(38) = -9999.00 SUBFILES(40) = -9999.00 SUBFILES(42) = -9999.00 SUBFILES(44) = -9999.00 SUBFILES(46) = -9999.00 SUBFILES(48) = -9999.00 SUBFILES(50) = -9999.00 SUBFILES(52) = -9999.00 SUBFILES(54) =-9999.00 SUBFILES(56) = -9999.00 SUBFILES(58) = -9999.00 SUBFILES(60) = -9999.00 SUBFILES(62) = -9999.00 SUBFILES(64) = -9999.00 SUBFILES(66) = -9999.00 SUBFILES(67) = -9999.00 SUBFILES(68) = -9999.00 SUBFILES(69) = -9999.00 SUBFILES(70) = -9999.00 SUBFILES(71) = -9999.00 SUBFILES(72) = -9999.00 SUBFILES(73) = -9999.00 SUBFILES(74) = -9999.00 SUBFILES(75) = -9999.00 SUBFILES(76) = -9999.00 SUBFILES(77) = -9999.00 SUBFILES(78) = -9999.00 SUBFILES(79) = -9999.00 SUBFILES(80) = -9999.00 SUBFILES( 81 ) = -9999.00 SUBFILES(82) = -9999.00 SUBFILES(83) = -9999.00 SUBFILES(84) = -9999.00 SUBFILES(85) = -9999.00 SUBFILES(86) = -9999.00 SUBFILES(87) = -9999.00 SUBFILES(88) =-9999.00 SUBFILES(89) = -9999.00 SUBFILES(90) = -9999.00 SUBFILES( 91) = -9999.00 SUBFILES(92) = -9999.00 SUBFILES(93) = -9999.00 SUBFILES(94) = -9999.00 SUBFILES(95) = -9999.00 SUBFILES(96) = -9999.00 SUBFILES(97) = -9999.00 SUBFILES(98) = -9999.00 SUBFILES(99) = -9999.00 SUBFILES(100) = -9999.00 SUBFILES(101) -- -9999.00 SUBFILES(102) = -9999.00 SUBFILES(103) = -9999.00 SUBFILES(104) = -9999.00 SUBFILES(105) = -9999.00 SUBFILES(106) = -9999.00 SUBFILES(107) = -9999.00 SUBFILES(108) = -9999.00 SUBFILES(109) = -9999.00 SUBFILES(110) = -9999.00 SUBFILES(111) = -9999.00 SUBFILES(112) = -9999.00 SUBFILES(113) = -9999.00 SUBFILES(114) = -9999.00 SUBFILES(115) = -9999.00 SUBFILES(116) = -9999.00 SUBFILES(117) = -9999.00 SUBFILES(118) = -9999.00 SUBFILES(119) = -9999.00 SUBFILES(120) = -9999.00 SUBFILES(121) = -9999.00 SUBFILES(122) = -9999.00 SUBFILES(123) = -9999.00 SUBFILES(124) = -9999.00 SUBFILES(125) = -9999.00 SUBFILES(126) = -9999.00 SUBFILES(127) = -9999.00 SUBFILES(12$) = -9999.00 ~-- STRING PARAMETERS ............................................. INTERPOL= YES Input Tape Device, LU (1) is: TAPEC: Output Tape-Image file, LU (2) is: C:\DATA\1443\PILOT~1443.TAP (Output Tape-Image file will be created) Listing Method ("LISTMETH") = 0, Depth Unit oriented listing. Listing Frequency ("LISTFREQ") is every ( 50) units of Depth. Listing output limiting (LISTMAX) not enabled... (to enable list limiting set LISTMAX positive) Data Statistics reporting ("STATS") has not been enabled. (Specify. STATS=I to enable this feature) Automatic curve renaming has been disabled by user input (AUTOCURV=0). Automatic "FILE=n" card generation is disabled. (This is the program default, AUTOFILE=0) (Specify AUTOFILE=I to enable this feature) LIS comment record decoding (COMMENTS= 1) has been enabled by user input. LIS information record decoding (INFORECS=I) has been enabled by user input. The WRITEASC option has not been enabled... (to write ASCII subfiles specify WRITEASC=I) Tape Subtile 1 is ty. pe: LIS **** REEL HEADER **** MWD 95/8/9 1443 O1 **** TAPE HEADER **** MWD 95/8/9 1443 01 Tape Subtile: 1 2 records... Minimum recold length: 132 bytes Maximum record length: 132 bytes Tape Subtile 2 is type: LIS LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: X-30 Pilot Hole API NUMBER: 500292255080 OPERATOR: BP Exploration (Alaska) Inc. LOGGING COMPANY: BAKER HUGHES INTEQ TAPE CREATION DATE: 09-AUG-95 JOB DATA MWD RUN 5 MWD RUN 6 MWD RUN 3 JOB NUMBER: 1443 1443 LOGGING ENGINEER: SUTHERLAND BURTON OPERATOR WITNESS: M. WHITELY M. WHITELY SURFACE LOCATION SECTION: 7 TOWNSHIP: 1 ON RANGE: 14E FNL: FSL: 4722 FEL: 876 FWL: " ELEVATION(FT FROM MSL 0) KELLY BUSHING: 70.10 DERRICK FLOOR: 69.10 GROUND LEVEL: 39.00 WELL CASING RECORD OPEN HOLE CASING DRiLLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) IST STRING 13.500 10.750 3276.0 2ND STRING 9.875 7.625 11627.0 3RD STRiNG 6.750 PRODUCTION STRING REMARKS: LOGS SHIFTED TO WIRELINE DATA AT CUSTOMER REQUEST **** FILE HEADER **** MWD .001 1024 LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH MWD 10870.0 11580.0 MWD 11401.0 12100.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD 5 MWD 6 $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 10870.0 11580.0 11401.0 12100.0 CN : BP Exploration (Alaska) WN : X-30 Pilot Hole FN : Prudhoe Bay COUN :North Slope STAT :Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS EDITED MERGED MWD DATA THAT HAS BEEN DEPTH SHIFTED TO WIRELINE DATA. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 910111213141516 000 I 0000000 I 000 I Rep Code Count Bytes 68 4 16 Sum: 4 16 16 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: APl APl APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 I GAPI 4 4 98 660 71 6 2 RA MWD 68 1 OHMM 4 4 98 660 71 6 3 ROP MWD 68 1 FPHR 4 4 98 660 71 6 4 RP MWD 68 1 ©HMM 4 4 98 660 71 6 16 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 50 FRAMES * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 50 Tape File Start Depth = 10870.000000 Tape File End Depth -- 12100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 2766 datums Tape Subfile: 2 125 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subtile 3 is .type: LIS **** FILE HEADER **** MWD .002 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 10870.0 11580.0 $ LOG HEADER'DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): STOP DEPTH M1.34 MI.34 MEMORY 24 APR 95 TD DRILLER (FT): .0 TOP LOG INTERVAL (FT): 10870.0 BOTTOM LOG INTERVAL (FT): 11580.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 53.7 MAXIMUM ANGLE: 60.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE MWD DUAL PROPAGATION $ TOOL NUMBER 6198-03 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.625 .0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.10 MUD VISCOSITY (S): .0 MUD PH: .0 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): 9.625 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: $ CN : BP Exploration (Alaska) WN : X-30 Pilot Hole FN : Prudhoe Bay COUN :North Slope STAT :Alaska .000 .0 .000 .0 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 5. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(I) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 12 13 14 15 16 000 I 0000000 I 000 1 Rep Code Count Bytes 68 18 72 Sum: 18 72 72 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: API API APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 AZT MWD 68 1 DEG 4 4 98 660 71 6 2 DCCM MWD 68 1 4 4 98 660 71 6 3 GRAMMWD 68 I GAPI 4 4 98 660 71 6 4 GRAXMWD 68 I GAPI 4 4 98 660 71 6 5 INC MWD 68 I DEG 4 498 660 71 6 6 PDCMMWD 68 1 DEG 4 4 98 660 71 6 7 PDDCMWD 68 I DEG 4 4 98 660 71 6 8 PDEMMWD 68 I MIN 4 4 98 660 71 6 9 PDIMMWD 68 1 PTFT 4 4 98 660 71 6 10 RACMMWD 68 I OHMM 4 4 98 660 71 6 11 RADEMWD 68 1 OHMM 4 4 98 660 71 6 12 ROPSMWD 68 1 FPHR 4 4 98 660 71 6 13 RPCMMWD 68 1 OHMM 4 4 98 660 71 6 14 RPDEMWD 68 I OHMM 4 4 98 660 71 6 15 STVDMWD 68 I FT 4 4 98 660 71 6 16 TCDMMWD 68 1 DEGF 4 4 98 660 71 6 17 TCDXMWD 68 1 DEGF 4 4 98 660 71 6 18 WBCS19IWD 68 1 LB 4 4 98 660 71 6 72 o _ ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMEs Data Record Length indicates: 13 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 219 Tape File Start Depth = 10870.000000 Tape File End Depth = 11580.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7054 datums Tape Subtile: 3 283 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subtile 4 is type: LIS **** FILE HEADER **** MWD .003 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 11401.0 12100.0 $ LOG HEADER -DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): STOP DEPTH MI .34 M1.34 REAL-TIME 28 APR 95 1418 TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.625 BOREHOLE CONDITIONS MUD TYPE: LSND TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE MWD NAVIGAMMA $ TD DRILLER (FT): .0 TOP LOG INTERVAL (FT): 11401.0 BOTTOM LOG INTERVAL (FT): 12100.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 53.7 MAXIMUM ANGLE: 60.0 MUD DENSITY (LB/G): 9.90 MUD VISCOSITY (S): .0 MUD PH: .0 MUD CHLORIDES (PPM): 700 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TEMPERATURE: .000 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 9.625 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: THE INTERVAL FROM 11570 TO 11627 FT MD ( 8825 TO 8853 FEET SSTVD) WAS LOGGED BEHIND CASING. $ CN : BP Exploration (Alaska) WN : X-30 Pilot Hole FN : Prudhoe Bay COUN :North Slope STAT :Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 6. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-ty. pe is: Entry Block terminator. Summary of entry types encountered: l 2 3 4 5 6 7 8 91011 1213141516 000 I 0000000 1 000 1 Rep Code Count Bytes 68 18 72 Sum: 18 72 72 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: APl APl APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 AZT MWD 68 1 DEG 4 4 98 660 71 6 DCCMMWD 68 1 4 4 98 660 71 6 GRAMMWD 68 I GAPI 4 4 98 660 71 6 GRAXMWD 68 I GAPI 4 4 98 660 71 6 INC MWD 68 1 DEG 4 4 98 660 71 6 PDCMMWD 68 1 DEG 4 4 98 660 71 6 PDDCMWD 68 I DEG 4 4 98 660 71 6 PDEMMWD 68 I MIN 4 4 98 660 71 6 PDIMMWD 68 I PTFT 4 4 98 660 71 6 RACMMWD 68 1 OHMM 4 4 98 660 71 6 RADEMWD 68 I OHMM 4 4 98 660 71 6 ROPSMWD 68 I FPHR 4 4 98 660 71 6 RPCMMWD 68 1 OHMM 4 4 98 660 71 6 RPDEMWD 68 1 OHMM 4 4 98 660 71 6 STVDMWD 68 I FT 4 4 98 660 71 6 TCDMMWD 68 I DEGF 4 4 98 660 71 6 TCDXMWD 68 1 DEGF 4 4 98 660 71 6 WBCSMWD 68 I LB 4 4 98 660 71 6 72 ** Routine LEVONE detects data discrepancy: DSB indicates: I FRAMES Data Record Length indicates: 13 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES* Total Data Records: 216 Tape File Start Depth -- 11401.000000 Tape File End Depth = 12100.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary.: Rep Code: 68 9704 datums Tape Subtile: 4 281 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subtile 5 is type: LIS **** TAPE TRAILER **** MWD 95/8/9 1443 01 **** REEL TRAILER **** MWD 95/8/9 1443 01 Tape Subtile: 5 2 records... Minimum reco/d length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 9 AUG 95 3:06p Elapsed execution time = 28.72 seconds. SYSTEM RETURN CODE = 0 Tape Subtile 1 is type: LIS Tape Subtile 2 is type: LIS DEPTH GR RA ROP RP 10870.0000 -999.2500 3.4714 -999.2500 3.0593 10870.5000 -999.2500 3.4786 -999.2500 3.0857 10900.0000 -999.2500 3.1141 -999.2500 3.0781 10950.0000 -999.2500 3.7128 94.7876 3.5997 11000.0000 -999.2500 3.5536 90.2660 3.8409 11050.0000 -999.2500 3.5686 93.1604 3.8238 11100.0000 -999.2500 7.1210 73.2550 3.7031 11150.0000 -999.2500 2.7890 63.4974 2.7965 11200.0000 -999.2500 3.0704 37.3222 2.7491 11250.0000 -999.2500 3.8570 41.9035 2.5276 11300.0000 -999.2500 5.2222 26.1674 3.0457 11350.0000 -999.2500 4.2520 29.2100 3.9125 11400.0000 -999.2500 3.7510 22.6318 4.4167 11450.0000 -999.2500 6.9420 36.0873 6.3722 11500.0000 -999.2500 4.7266 39.2997 5.3350 11550.0000 -999.2500 4.8884 41.8298 5.1118 11600.0000 134.1597 -999.2500 25.9781 -999.2500 11650.0000 61.6386 -999.2500 6.7392 -999.2500 11700.0000 119.9936 -999.2500 20.8349 -999.2500 11750.0000 96.1864 -999.2500 18.3558 -999.2500 11800.0000 34.5470 -999.2500 93.7942 -999.2500 11850.0000 22.8105 -999.2500 57.3895 -999.2500 11900.0000 25.2649 -999.2500 87.0412 -999.2500 11950.0000 29.1920 -999.2500 83.9206 -999.2500 12000.0000" 21.3378 -999.2500 148.2356 -999.2500 12050.0000 22.8105 -999.2500 69.5381 -999.2500 12100.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10870.000000 Tape File End Depth = 12100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet Tape Subtile 3 is type: LIS DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCDX WBCS 10870.0000 -999.2500 128.3990 -999.2500 13.6374 13.3461 4.2499 3.9323 -999.2500 -999.2500 -999.2500 -999.2500 10870.2500 -999.2500 128.2909 -999.2500 13.6225 13.3312 4.2244 3.9112 -999.2500 -999.2500 -999.2500 -999.2500 10900.0000 -999.2500 132.9563 -999.2500 14.2646 13.9701 3.4720 3.2567 -999.2500 -999.2500 -999.2500 -999.2500 10950.0000 -999.2500 130.3183 -999.2500 13.9016 13.6081 3.6591 3.4233 119.1109 -999.2500 141.9125 -999.2500 11000.0000 -999.2500 124.4303 -999.2500 " 13.0917 12.8025 3.7863 3.5436 107.5738 -999.2500 135.5000 -999.2500 11050.0000 -999.2500 113.8768 -999.2500 11.6430 11.3612 4.0038 3.7526 105.9458 -999.2500 135.5000 -999.2500 11100.0000 -999.2500 119.7704 -999.2500 12.4624 12.1759 3.7117 3.4873 94.7199 -999.2500 137.3000 -999.2500 11150.0000 -999.2500 127.2020 -999.2500 13.4742 13.1833 3.9703 3.6962 83.4528 -999.2500 140.0000 -999.2500 11200.0000 -999.2500 173.6279 -999.2500 19.8649 19.5480 2.3728 2.2472 46.8202 -999.2500 144.5675 -999.2500 143.7122 -999.2500 0.0000 9.6667 3.1347 3.2472 -999.2500 138.0464 -999.2500 0.0000 10.0000 3.1403 3.2531 -999.2500 150.2998 -999.2500 16.5000 146.3333 2.9127 3.0144 -999.2500 154.4295 -999.2500 84.1667 403.3333 3.0382 3.1462 0.0000 129.8322 -999.2500 55.0000 660.3333 3.3494 3.4729 0.0000 165.3455 -999.2500 47.0000 919.3334 4.0407 4.2005 0.0000 154.2849 -999.2500 51.0000 1169.3333 3.6308 3.7637 0.0000 150.2365 -999.2500 75.7500 1472.7500 3.1972 3.3124 0.0000 157.0642 -999.2500 87.3333 1784.3333 1.6673 1.7131 23.6374 DEPTH AZT DCCM GRAM GRAX iNC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCDX WBCS 11250.0000 -999.2500 145.1462 -999.2500 15.9526 15.6502 4.2964 3.9333 41.0891 -999.2500 147.2000 -999.2500 11300.0000 -999.2500 133.6146 -999.2500 14.3559 14.0586 7.6727 6.5694 31.4420 -999.2500 148.7750 -999.2500 11350.0000 -999.2500 112.5009 -999.2500 11.4554 11.1747 5.3813 4.9209 26.4956 -999.2500 151.0250 -999.2500 11400.0000 -999.2500 119.3693 -999.2500 12.3988 12.1143 3.9921 3.7311 65.4040 -999.2500 153.2750 -999.2500 11450.0000 -999.2500 85.3436 -999.2500 7.7659 7.5190 15.6591 12.4294 72.1385 -999.2500 153.9500 -999.2500 11500.0000 -999.2500 101.5563 -999.2500 9.9567 9.6891 4.7380 4.4167 35.8054 -999.2500 155.5250 -999.2500 11550.0000 -999.2500 90.1801 -999.2500 8.4128 8.1582 6.9013 6.2616 46.0683 -999.2500 152.3750 -999.2500 11580.0000 -999.2500 100.7779 -999.2500 9.8548 9.5877 6.0010 5.4764 34.9214 -999.2500 153.9500 -999.2500 157.4416 -999.2500 95.6667 2114.3330 2.4229 2.4989 23.7176 161.6948 -999.2500 96.3333 2452.3330 2.8826 2.9834 66.4480 146.3906 -999.2500 96.0000 2792.3330 4.1464 4.3114 28.0227 155.0511 -999.2500 96.6250 3110.8750 3.6567 3.7942 32.3278 155.2337 -999.2500 85.0000 3448.3330 7.5009 7.8599 27.3542 147.9467 -999.2500 131.0000 3774.0000 5.1573 5.3788 32.1474 153.6776 -999.2500 100.0000 4114.7500 6.6574 6.9702 66.2875 148.8630 -999.2500 176.5000 4310.3330 5.2429 5.4660 27.6684 Tape File Start Depth = 10870.000000 Tape File End Depth = 11580.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 4 is type: LIS DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCD× WBCS 11401.0000 -999.2500 115.3187 -999.2500 11.8402 11.5588 4.1271 3.8563 65.5214 -999.2500 153.2750 -999.2500 11401.2500 -999.2500 114.6748 -999.2500 11.7526 !1.4707 4.1760 3.8996 49.1973 -999.2500 153.2750 -999.2500 11450.0000 -999.2500 85.3436 -999.2500 7.7659 7.5190 15.6591 12.4294 72.1385 -999.2500 153.9500 -999.2500 11500.0000 -999.2500 101.5563 -999.2500 9.9567 9.6891 4.7380 4.4167 35.8054 -999.2500 155.5250 -999.2500 11550.0000 -999.2500 90.1801 -999.2500" 8.4128 8.1582 6.9013 6.2616 46.0683 -999.2500 152.3750 -999.2500 160.4875 -999.2500 102.0000 3117.3330 3.9342 4.0877 31.6192 160.4224 -999.2500 101.6667 3118.3330 3.9813 4.1374 31.6660 155.2337 -999.2500 85.0000 3448.3330 7.5009 7.8599 27.3542 147.9467 -999.2500 131.0000 3774.0000 5.1573 5.3788 32.1474 153.6776 -999.2500 100.0000 4114.7500 6.6574 6.9702 66.2875 11750.0000 -999.2500 -999.2500 -999.2500 84.1303 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 19.1798 -999.2500 -999.2500 -999.2500 -999.2500 138.0200 48.4200 11700.0000 -999,2500 -999.2500 -999.2500 245.4763 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 15.0243 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 28.6372 11650.0000 -999.2500 -999.2500 -999.2500 97.1797 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7.0266 -999.2500 -999.2500 -999.2500 -999.2500 142.3399 14.2315 11600.0000 -999.2500 -999.2500 -999.2500 80.7350 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 24.3605 -999.2500 -999.2500 -999.2500 156.6500 -999.2500 27.7286 DEPTH AZT DCCM GRAM GRAX INC PDCM PDDC PDEM PDIM RACM RADE ROPS RPCM RPDE STVD TCDM TCDX WBCS 11800.0000 -999.2500 -999.2500 -999.2500 33.6918 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 64.2684 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 47.3783 11850.0000 -999.2500 -999.2500 -999.2500 30.1036 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 85.4554 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 47.8723 11900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 66.6583 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 44.4785 32.1373 -999.2500 -999.2500 12100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 143.9600 -999.2500 Tape File Start Depth = 11401.000000 Tape File End Depth = 12100.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 12000.0000 -999.2500 -999.2500 -999.2500 31.1555 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 55.6785 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 24.3628 12050.0000 187.5000 -999.2500 -999.2500 26.7375 53.7000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 70.5644 -999.2500 -999.2500 9088.2207 -999.2500 -999.2500 21.1193 11950.0000 -999.2500 -999.2500 -999.2500 22.3196 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 72.3278 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 28.5814 Tape Subtile 5 is type: LIS Tape Subfile 2 is ty~e~ ~IS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING RUN 1 6421.00 K. RICHARDS GRAB/WHITELY REMARKS: OPEN HOLE X - 30 PH 500292255080 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 03-MAY-95 RUN 2 RUN 3 7 i0N 14E 4722 876 70.10 0.00 31.00 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 7.625 11627.0 6.750 12100.0 DIFL/AC/GR. CIRCULATION STOPPED AT 1030, 01-MAY-95. REPEAT SECTION LOGGED DOWN. TOOL SET DOWN 11682 - 11715. PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC- TIONS WERE APPLIED TO THE DIL DATA. THE DIL DATA WAS CORRECTED FOR BOREHOLE SIZE (6.750"). THE CORRECTED DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES. RT = TRUE FORMATION RESISTIVITY. DI = DEPTH OF INVASION. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; hole data. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 11620.0 11993.0 BCS 11620.0 12012.0 DIL 11620.0 12040.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH LL8 11621.5 11628.5 11630.0 11638.0 11641.0 11641.5 11644.0 11647.5 11648.5 11648.0 11653.0 11653.5 11656.5 11659.0 11663.0 11664.5 11665.0 11665.5 11667.0 11669.0 11672.0 11672.5 11672.5 11674.5 11676.0 11677.0 11681.0 11682.0 11685.5 11692.0 11702.0 11702.5 11704.5 11714.0 11715.5 11715.5 11717.5 11717.5 11718.0 11724.0 11728.0 11732.0 11733.5 11736.0 11741.0 11743.0 11742.0 11744.0 11757.0 11756.0 all runs merged; no case EQUIVALENT UNSHIFTED DEPTH ILD DT SP 11622.0 11628.0 11630.0 11638.0 11643.5 11649.0 11653.5 11653.5 11657.0 11659.0 11663.0 11665.0 11667.0 11669.0 11668.0 11672.0 11674.5 11676.5 11681.5 11682.0 11686.5 11692.0 11693.0 11703.0 11702.0 11704.5 11714.5 11714.5 11718.5 11718.0 11724.5 11728.5 11731.0 11734.0 11735.5 11741.0 11744.5 11758.5 11767.5 11769.5 11774.5 11776.5 11782.5 11783.0 11790.0 11795.0 11811.5 11831.5 11847.5 11856.0 11856.5 11888.5 11904.5 11907.0 11910.0 11911.0 11918.0 11954.0 11994.5 $ MERGED DATA SOURCE PBU TOOL CODE GR BCS DIL $ REMARKS: 11767.0 11768.5 11773.5 11776.0 11782.0 11789.5 11794.5 11793.5 11856.5 11856.5 11888.5 11888.5 11904.5 11904.5 11908.0 11908.0 11910.5 11910.5 11918.5 11918.5 11954.0 11954.0 11758.5 11783.0 11782.0 11811.5 11810.0 11832.5 11831.0 11848.0 11856.5 11856.5 11889.0 11888.5 11910.0 11911.0 11954.5 11996.0 11917.5 11954.5 RUN NO. PASS NO. MERGE TOP 1 4 11620.0 1 4 11620.0 1 4 11620.0 OPEN HOLE portion of MAIN PASS. MTEM, ILM, TEND, & TENS WERE SHIFTED WITH LL8. RT, & DI WERE SHIFTED WITH ILD. MERGE BASE 11993.0 12012.0 12040.0 / ? ?MATCH1. OUT / ? ?MATCH2. OUT / ? ?MATCH3. OUT / ? ?MATCH4. OUT $ CN : BP EXPLORATION WN : X - 30 PH FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: (ALASKA) Name ToOl Code Samples Units Size API API API API Log Crv Crv Length Typ Typ Cls Mod i GR BC$ 6% 1 GAPI 4 2 DT BCS 68 1 US/F 4 3 TEND BCS 68 1 LB 4 4 TENS BCS 68 1 LB 4 5 LL8 DIL 68 I OHMM 4 6 ILM DIL 68 i OHMM 4 7 ILD DIL 68 1 OHMM 4 8 RT DIL 68 i OHMM 4 9 DI DIL 68 i IN 4 10 SP DIL 68 i MV 4 11 MTEM DIL 68 I DEGF. 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 42 ~ 67 465 06 4 84 653 71 4 20 789 90 4 20 789 90 4 50 746 76 4 50 746 76 4 50 746 76 4 50 746 76 4 50 746 76 4 50 746 76 4 50 746 76 44 Tape File Start Depth = 12050.000000 Tape File End Depth = 11619.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10357 datums Tape Subfile: 2 200 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 10725.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ REMARKS: CASING PASS. STOP DEPTH 11620.0 EQUIVALENT UNSHIFTED DEPTH CN WN FN COUN' STAT : BP EXPLORATION (ALASKA) : X-30PH : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 3 Curves: Name Tool Code Samples Units 1 GRCH GR 68 1 GAPI 2 TEND GR 68 1 LB 3 TENS GR 68 1 LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 21 990 60 6 4 10 579 41 1 4 10 579 41 1 12 * DATA RECORD (TYPE# 0) Total Data Records: 31 1014 BYTES * Tape File Start Depth = 11680.000000 Tape File End Depth = 10704.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER *** LIS representation code decoding summary: Rep Code: 68 7813 datums Tape Subfile: 3 58 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String ~1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. AC DIFL $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 4 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11541.0 11559.0 11581.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP PCM GR AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY BHC ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: STOP DEPTH 11994.0 12013.0 12041.0 01-MAY-95 FSYS REV. J001 VER. 1.1 1030 01-MAY-95 1530 01-MAY-95 12100.0 12042.0 10730.0 12040.0 1800.0 TOOL NUMBER 3974XA 3967XA 2806XA 3506XA 1309XA 1603MA/1609EA 1503XA 6.750 11627.0 11620.0 LSND 8.90 41.0 9.3 6.8 177.0 1.930 .764 3.510 66.0 177.0 66.0 MUD FILTRATE ~_~' BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : X - 30 PH : PRUDHOE BAY : NORTH SLOPE : ALASKA .000 .0 .820 66.0 .000 .0 .00 .000 1.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR AC 68 1 GAPI 4 2 AC AC 68 1 US/F 4 3 ACQ AC 68 1 4 4 TlR1 AC 68 1 US 4 5 TlR2 AC 68 1 US 4 6 T2R1 AC 68 1 US 4 7 T2R2 AC 68 1 US 4 8 CHT AC 68 1 LB 4 9 TTEN AC 68 1 LB 4 10 SPD AC 68 1 F/MN 4 11 RFOC DIFL 68 1 OHMM 4 12 RILM DIFL 68 1 OHMM 4 13 RILD DIFL 68 1 OHMM 4 14 VILM DIFL 68 1 MV 4 15 VILD DIFL 68 1 MV 4 16 CILD DIFL 68 1 MMHO 4 17 RT DIFL 68 1 OHMM 4 18 DI DIFL 68 1 IN 4 19 SP DIFL 68 1 MV 4 20 TEMP DIFL 68 1 DEGF 4 4 06 969 49 4 48 852 89 4 81 285 47 4 81 285 47 4 81 285 47 4 81 285 47 4 81 285 47 4 95 558 30 4 95 558 30 4 61 094 30 4 27 515 24 4 06 213 78 4 04 903 06 4 04 522 10 4 04 522 10 4 34 704 23 4 04 903 06 4 06 213 78 4 53 419 67 4 40 467 34 80 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 177 Tape File Start Depth = 12051.000000 Tape File End Depth = 11523.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 54731 datums Tape Subfile: 4 254 records... Minimum record length: Maximum record length: 44 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 3 .2500 VENDOR TOOL CODE START DEPTH GR 11550.0 AC 11568.5 DIFL 11590.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 11992.0 11992.0 11992.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP PCM GR AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY BHC ACOUSTILOG DUAL INDUCTION BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: 01-MAY- 95 FSYS REV. J001 VER. 1.1 1030 01-MAY-95 1521 01-MAY-95 12100.0 12042.0 10730.0 12040.0 1800.0 TOOL NUMBER 3974XA 3967XA 2806XA 3506XA 1309XA 1603MA/1609EA 1503XA 6.750 11627.0 11620.0 LSND 8.90 41.0 9.3 6.8 177.0 1.930 .764 3.510 .000 .820 66.0 177.0 66.0 .0 66.0 MUD CAKE AT B~..: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS (LOGGED DOWN). $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : X- 30 PH : PRUDHOE BAY : NORTH SLOPE : ALASKA .000 .0 .00 .000 1.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves'. Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR AC 68 1 GAPI 4 2 AC AC 68 1 US/F 4 3 ACQ AC 68 I 4 4 TlR1 AC 68 1 US 4 5 TlR2 AC 68 1 US 4 6 T2R1 AC 68 1 US 4 7 T2R2 AC 68 1 US 4 8 CHT AC 68 1 LB 4 9 TTEN AC 68 1 LB 4 10 SPD AC 68 1 F/MN 4 11 RFOC DIFL 68 1 OHMM 4 12 RILM DIFL 68 1 OHM~ 4 13 RILD DIFL 68 1 OHMM 4 14 VILM DIFL 68 1 MV 4 15 VILD DIFL 68 1 MV 4 16 CILD DIFL 68 1 MMHO 4 17 RT DIFL 68 1 OHMM 4 18 DI DIFL 68 1 IN 4 19 SP DIFL 68 1 MV 4 20 TEMP DIFL 68 1 DEGF 4 4 06 969 49 4 48 852 89 4 81 285 47 4 81 285 47 4 81 285 47 4 81 285 47 4 81 285 47 4 95 558 30 4 95 558 30 4 61 094 30 4 27 515 24 4 06 213 78 4 04 903 06 4 04 522 10 4 04 522 10 4 34 704 23 4 04 903 06 4 06 213 78 4 53 419 67 4 40 467 34 80 6 1 0 0 0 0 0 1 1 1 6 0 0 6 6 6 0 0 0 0 * DATA RECORD (TYPE# 0) Total Data Records: 158 1014 BYTES * Tape File Start Depth = 11996.000000 Tape File End Dep%.. = 11523.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 47567 datums Tape Subfile: 5 Minimum record length: Maximum record length: 233 records... 44 bytes 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 5 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10725.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 11623.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP PCM GR AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY BHC ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: 01-MAY-95 FSYS REV. J001 VER. 1.1 1030 01-MAY-95 1553 01-MAY-95 12100.0 12042.0 10730.0 12040.0 1800.0 TOOL NUMBER 3974XA 3967XA 2806XA 3506XA 1309XA 1603MA/1609EA 1503XA 6.750 11627.0 11620.0 LSND 8.90 41.0 9.3 6.8 177.0 1.930 .764 3.510 .O00 .820 .000 66.0 177.0 66.0 .0 66.0 .0 MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: CASING PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : X- 30 PH : PRUDHOE BAY : NORTH SLOPE : ALASKA . ~0 .000 1.0 * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CHT GR 68 3 TTEN GR 68 4 SPD GR 68 1 GAPI 4 1 LB 4 1 LB 4 1 F/MN 4 4 21 990 60 6 4 10 579 41 1 4 10 579 41 1 4 76 115 41 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 79 Tape File Start Depth = 11680.000000 Tape File End Depth = 10704.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 74257 datums Tape Subfile: 6 148 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 7 is type: LIS 01 **** REEL TRAILER **** 95/ 5/ 3 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 3 MAY 95 3:04p Elapsed execution time = 8.68 seconds. SYSTEM RETURN CODE = 0