Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-025Samuel Gebert Hilcorp Alaska, LLC GeoTech Assistant 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 10/13/2020 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU F-37 (PTD 195-025) Multi Finger Caliper Log 11/25/2019 ANALYSIS FIELD DATA Please include current contact information if different from above. PTD: 1950250 E-Set: 34075 Received by the AOGCC 10/13/2020 Abby Bell 10/14/2020 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVED JAN 03 2Q20 AOGCC; 1. Operations Abandon LJ Plug Perforations LJ Fracture StimulatLi Pull Tubing U Operations shutdown Performed: Suspend p Perforate ❑ Other Stimulat❑ Alter Casing E] Change Approved Program ❑✓ Plug for Redrill ❑ arforate New Pool ❑ Repair We❑ Re-enter Susp Well ❑ Other: ESP Change -out ❑� 2. Operator Hilcorp Alaska LLC 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development Q Exploratory ❑ 195-025 3. Address: 3800 Centerpoint Dr, Suite 1400 Anchorage, Stratigraphic❑ Service ❑ 6. API Number: AK 99503 50-029-22548-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0025509 /ADL0355018 MILNE PT UNIT F-37 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A MILNE POINT/ KUPARUK RIVER OIL 11. Present Well Condition Summary: Total Depth measured 12,915 feet Plugs measured N/A feet true vertical 7,563 feet Junk measured N/A feet Effective Depth measured 12,810 feet Packer measured N/A feet true vertical 7,486 feet true vertical N/A feet Casing Length Size MD TVD Burst Collapse Conductor 80' 20" 112' 112' N/A N/A Surface 6,586' 9-5/8" 6,621' 4,521' 5,750psi 3,090psi Production 12,867' 7" 12,900' 7,552' 7,240psi 5,410psi Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth) 2-7/8" 6.5# / L-80 / EUE 8rd 12,386' 7,175' Packers and SSSV (type, measured and true vertical depth) N/A N/A N/A N/A 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 640 0 Subsequent to operation: 175 49 1,453 500 367 14. Attachments (required per20 AAC 25.070, 25.071, &25.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory❑ Development Service❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil Q Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR Q WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-265 & 319-518 ' Authorized Name: Chad Helgeson Contact Name: David Haakinso r Authorized Title: Operations Manager Contact Email: dhaakinsonlo)hilcoro com Authorized Signature: Date: 1/3/2020 Contact Phone: 777-8343 Form 10-404 Revised 4/2017 /—Y-20 BDMS 06t IJAN 0 6 2020 ®9I�0zo Submit Original Only K Hilcoep Alaska, LLC Odg. IB Elev.: 47'/ Odg. GL Bey.: 13'(N27E) TD= 12,915' (MD) /To=7,563'(TVD) PBTD=12,810'(MD) / PBTD= 7,4W(TVD) SCHEMATIC Milne Point Unit Well: MPU F-37 Last Completed: 12/11/2019 PTD: 195-025 TREE & WELLHEAD Tree 3-1/S"WKM SM Wellhead 11""SM FMC w/3.5" FMC Tbg. Hanger, Top NSTC Lift Threads, 3" C1VV "H" BPV profile OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in 30" Hole 9-5/8" 1,322 sx PF 'E', 250 sx V, 250 sx PF'E'in 12-1/4" HOII 7" 202 sx Class "G" in 8-1/2" Hole CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1/NT80LHE/Weld N/A Surface 112' N/A 9-5/8" Surface 40 / L 80 / Btc. 8.835 Surface 6,621' 0.0758 7" Production 26/NT-80/NSCC 6.276 Surtace 12,900' 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE Srd 2.441 Surtace 12,393' 0.0058 WELL INCLINATION DETAIL KOP @ 700' Max Hale Angle = 65 to 67 deg. f/ 5,800' to 10,850' Hole Angle through perforations = 42 deg. JEWELRY DETAIL PERFORATION DETAIL Sands Top (MD) Item Top (TVD) Btm (TVD) XO: 3-1/2" x 2-7/8" Type Date STA 2: 2-7/8"xl" GLM (0.25" Orifice) ' H12,322.9' STA1:2-7/8"xl"GLM(Dummy Valve) 7,257' ' 2-7/8"XN Nipple - Min in= 2.205" 3-3/8"/6SPF ' Bolt On Discharge Head: FPDIS iparuk Al ' Ported Head 7,295' 9' Adapter Body 8 12,323' Pump 2: 538 PMSXD-32P17 9 12,328' Pump 1: 538 PMSXD- 137P17 10 12,347' Gas Separator: GSHVV 11 12,351' Upper Tandem Seal: GSB3DB H6 SB/AB PFSA 12 12,357 -Lo- - wer Tandem Sea[: GSB3DB H65B/AB PFSA 13 12,364' otor: XP 25OHp/ 2,505V / 61A 14 12,381' Zenith Sensor & Centralizer- Btm @ 12,386' PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Type Date Status 12,498' 12,540' 7,257' 7,287' 42 3-3/8"/6SPF 4/17/95 Open iparuk Al 12,550' 12,594' 7,295' 7,327' 14 3-3/8"/6SPF 4/17/95 Open V-12,594' 12,624' 7,327' 7,349' 30 3-1/8" /6SPF 12/10/19 Open Terence Log: 4/15/1995 AWS GR / CCL - Jumbo Jet Charges EHD = 0.76', TTP = 6.4" - Mid-oerf=12.546MD. 7 289TVD STIMULATION SUMMARY 120,0001 bs 16-20 CL ISP 4/22/1995 Kup A sand - Did not screen out. NOTE: 7" Casing PT to 3,700psi from 12,400'7/3/2012 GENERAL WELL INFO API: 50-029-22546-00-00 Drilled and Cased by Nabors 27E -4/11/1995 Run ESP Completion by Nabors 4ES -11/10/1995 ESP Change -out by Nabors 4ES -11/121996 ESP Change -out by Nabors 4ES-6/29/2000 ESP Change -out by Nabors 4ES-6/25/2006 ESP Change -out by Doyon 16 -7/5/2012 ESP Change -out/ Pert Add by Innovation -12/11/2019 Revised By: TDF 1/3/2020 Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MPF -37 Innovation 50-029-22548-00-00 195-025 12/7/2019 12/11/2019 12/4/2019 - Wednesday No operations to report. 12/5/2019 -Thursday - No operations to report. 12/6/2019 -Friday No operations to report. 12/7/2019 -Saturday. N/D tree: break flange and remove bolts. Clean off hanger, inspect LDS. Install CTS plug in BPV. M/U landingjoint XO to hanger - good. N/U BOPE, M/U choke and kill. 12/8/2019 -Sunday PJSM, R/U BOP test equipment. Flood lines, purge air and shell test 250/2,500 psi (test good). Test BOP's w/ 2-7/8" test jt (donut) 250/2,500 psi w/ 5 min hold on each. Chart and record same. AOGCC waived witness by Adam Earl. F/P on both HCR choke and lower IBOP (svc both and retest - good). Drawdown - 3000 psi initial, 1450 psi drawdown, 200 psi increase - 26 secs, full recovery - 96 secs. 6 bottle avg NO2 - 2333 psi. Check PVT system (good). Test gas alarms 10/20 H2S, 20/40 LEL. 7.5 hrs total test time. R/D test equipment. Blowdown test equipment, BOP and choke manifold. Bring Weatherford tools to rig floor. Pull CTS (TWC conversion for BPV). Check tbg for psi (on vac). Pull BPV. M/U 2-7/8" landingjt w/ NSCT xo to hanger. Verify IA (slight vac). BOLDS and unseat hanger (104k up, 70k dn). Pull hanger to rig floor without issue. Pump 10 bph 8.4 ppg SW every hour. Disconnect ESP cable from hanger. B/0 and L/D landing jt w/ xo. Hange ESP sheave in derrick. Hang elephant trunk. Attach rope to ESP cable with Lewis, snake rope through sheave and elephant trunk. Bring up BOT Centrilift tool box, thread protectors. Continue adding 10 bph of 8.4 pps SW every hour. POOH with 2-7/8" EUE tubing with ESP from 12,393' to 11,171', PUW 90K, SOW 65K. laying down tubing for disposal as per program (1st 118 pulled). Continue adding 10 bph of SW down backside. Cont. to POOH with 2-7/8" EUE tubing with ESP from 11,171'to 7000', L/D first 118 joints pulled, and joint 136 as per program. Lay down additional jnts 130, 166, and 169 due to egged pin end. Rack back all other joints, strap out of derrick. Continue adding 10 bph of SW down backside. 12/9/2019 - Monday PJSM, Continue POOH w/ 2-7/8" ESP completion F/ 7,000' to 1,932' MD. Changed out ESP spools @ 6,000' MD. Pump 10 BPH 8.4 ppg SW with no fluid to surface. SLIM out of derrick. L/D singles as per program, stand back all 2-7/8" tbg to be re- run. Slight residual oil on exterior to pipe. No notable scale observed on tubing pulled. Continue POOH w/ 2-7/8" ESP completion F/ 1,932' to break down ESP assembly. Strap tubing out of derrick. Cont to add 10 bph to hole. 201 cannon clamps recovered, 4 protectorlizers, 3 flat guards, 1 motor clamp. R/D Centrilift sheave, elephant trunk. Spot Pollard E -line truck and rig up, hange sheave in elevators. P/U 3-1/8" dummy gun assembly. RIH to 12,644', set down. Log up to 12,200' and discuss with town. POOH with E -Line. L/D E -Line tools from dummy run. Lower blocks and set sheave on rig floor. Rig down bell nipple from stack and lower to ground. Pick up shooting flange and nipple up to top of stack. Pick up wire line grease and pack -off tools. Load lubricator in pipe shed. Cont. filling the hole with 10 bph. Phase II weather condtions at Milne at 01:39. Re -head E -line as per Pollard. M/U XO's and 5' extension to top of shooting flange. Continue filling hole with 10 bph. Winds have subsided some in Deadhorse, contact Halliburton and arrange for convoy with Pollard change out truck - Phase II conditions in deadhorse. Milne Phase 1 as of 05:00. M/U 10' extension. M/U seal and packing assembly to top of lubricator. Pick up 30' lubricator off skate. M/U head to roller and stage assembly on floor. Wait on Halliburton to arrive on location. PVJ-1-e Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig I AN Number Well Permit Number Start Date End Date MP F-37 Innovation I 50-029-22548-00-00 195-025 1 12/7/2019 1 12/11/2019 12/10/2019-Tuesday Waiting on Halliburton to arrive on location due to weather conditions. Work on EAM inspections throughout rig. HES guns on location @ 07:00 hrs. M/U live 3-1/8" gun assy (30' guns), 6 spf, 60° w/ rollers 3x (btm, mid and top of guns). Stab lubricator and psi test same 250/1,150 psi (test good). RIH w/ guns using Pollard "E" line. Tagged btm @ 12,644' WLM. Logged up and correlate with existing logs. Confirm depths to fire guns w/ Engineer. RIH to tag depth. Pump 20 bbls 8.4 SW. Pick up putting guns on depth and fire same. Positive indication of fired guns. Saw slight psi @ surface w/ good indicators of line jump in unit. New pert depths 12,594' to 12,624' WLM. POOH w/ E-line. Pump another 20 bbls 8.4 SW once assy cleared old perfs @ 12,498'. We went static and slowly went on slight vac. Continued 10 bph maintenance fluid to well (source water). R/D spent guns (all shots fired). Clean and break down assy. L/D same. R/D lubricator, sheaves, shooting flange (N/U riser). Clean and clear rig floor. PJSM, Load ESP pump assy in shead. Spot spooling unit and power up same. R/U ESP cable to rig floor and prep for completion run. PJSM M/U ESP Motor 562XP 250 HP as per Baker. Oil and work all air out. Make MLE splice and plug in ESP cable and check continuity. PH-PH 3.8 ohms, PH-GND 2.01 GOhms, Temp & PSI good. PJSM RIH ESP and ESP Cable W/ 2.875" EUE L-80 6.5# out of Derrick and Pipe Shed F/ 73' to 2,671' MD as per tally. Install Cannon Clamps as per tally. TRQ connections to 2,250 ft/Ib. Ran 4 Protectolizers and 3 flat guards on Motor Assy. Cont filling 10 BPH. P/U 53K, SLK 53K. Check ESP Cable every 1,000' MD. Cont RIH ESP and ESP Cable W/ 2.875" EUE L- 80 6.5# out of Derrick and Pipe Shed F/ 2,671' to 8,300' MD as per tally. Install Cannon Clamps as per tally. TRQ connections to 2,250 ft/Ib. Cant filling 10 BPH. P/U 75K, SLK 63K. Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F-37 Innovation 50-029-22548-00-00 195-025 12/7/2019 12/11/2019 12/11/2019 - Wednesday C/O ESP spools in unit and splice same. Test cable (test good). Sym ops - Service rig. Prep equipment for tree install. 10 BPH hole fill w/ 8.4 ppg SW. Continue RIH w/ 2-7/8" EUE 8rd, L-80 tbg ESP completion as per tally F/ 8,300'to 12,359' MD. Tq connections 2250 ft/lbs. Test cable every 1,000' (all test good). 10 BPH hole fill w/ 8.4 ppg SW. Replaced 2-7/8" Tubing F/ 7,060' to 10,874' MD. M/U tubing hanger (NSCT connection top). Terminate ESP cable and M/U to penetrator. Test termination thru penetrator (test good). R/D ESP cable and stage equipment out of critical path for current operations. S/0 and landout ESP completion on depth @ 12,385' MD. 95k up, 73k do (38k string wt on hanger). RILDS. Test continuity post landing hanger (test good). 204 cannon clamps, 390jtstotal, 1 mtr protectolizer, 3 flat guards, 4 pump protectolizers. L/D landingjt. Install BPV. R/D remaining equipment. PJSM Pull riser, remove choke and kill lines. Bleed down Koomey. Rack back BOPE W/ 13.625" spacer spool onto pedestal. Secure BOPE. Install CTS. PJSM Install Tree and Torque bolts. Test Hanger void and Tree to 500 PSI 5 min and 5,000 PSI for 15 min, good. Remove CTS and install BPV. SIMOPS C/O lower IBOP and Saver sub on Top Drive. SIMOPS Load 4" D.P. in Pipe Shed. Clean Pits. PJSM Finish Top Drive feeder rings and Bell Guide. Bridal up and set Top Drive in scope down position. SIMOPS Secure Cellar and Cont loading 4" D.P. PJSM Scope down Derrick. PJSM Rig down Derrick assist and Geronimo lines. R/D out riggers. Pick up stairs on subs. R/D inner connects. Prep Pits and Pump Mods for move. Blow down Steam lines. 12/12/2019 -Thursday No operations to report. 12/13/2019 - Friday No operations to report. 12/14/2019 -Saturday No operations to report. THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Chad Helgeson Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk River Pool, MPU F-37 Permit to Drill Number: 195-025 Sundry Number: 319-518 Dear Mr. Helgeson: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such farther time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Y71� Jer ice Chair DATED this N day of November, 2019. IBDMS-k",OV 18 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 nnc 25 280 NOV 12 2019 AOGCC 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑� • Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ESP Change -out ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska LLC Exploratory ❑ Development Q. Stratigraphic ❑ Service ❑ 195-025 3. Address: 3800 Centerpoint Dr, Suite 1400 6. API Number: Anchorage Alaska 99503 50-029-22548-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 432D ' Will planned perforations require a spacing exception? Yes ❑ No ❑� MILNE PT UNIT F-37 ' 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL0025509 / ADL0355018 MILNE POINT / KUPARUK RIVER OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 12,915' ' 7,563' 12,810' 7,486' 1,582 N/A N/A Casing Length Size MD TVD Burst Collapse Conductor 80, 20" 112' 112' N/A N/A Surface 6,586' 9-5/8" 6,621' 4,521' 5,750psi 3,090psi Production 12,867' 7" 12,900' 7,552' 7,240psi 5,410psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade:Tubing MD (ft): See Schematic See Schematic 2-7/8" 6.5# / L-80 / EUE 8rd 12,393' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): N/A and N/A N/A and N/A 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory p ry ❑ Stratigraphic ❑ Development Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 12/3/2018 OIL Q WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Chad Helgeson Contact Name: David Haakinson Authorized Title: Operations Manager Contact Email: dhaakinson(Whii6orb.corn Contact Phone: 777-8343 Authorized Signature: Date: 11/12/2019 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: 3BDMS9 N0V 1 B 2019 Post Initial Injection MIT Yes E]No ❑ % Spacing Exception Required? Yes No ,L -I/ Subsequent Form Required: t-( ❑ ; � 4 L4 V APPROVED BY X Approved COMMISSIONER THE COMMISSION Date: 1 0 1R]. jl,� INA' �(Ay Submit Form and F ' ,, 10-403 Revisetl 4/2017 Approved application is Va607o1`72rRo17R15 IFOrn lll! tl� approval. Attachments in Duplicate R Hilcorn Alaska, LIG ESP Change -Out Well: MPU F-37 Date: 11-12-19 Well Name: MPU F-37 API Number: 50-029-22548-00 Current Status: Shut-in ESP Producer Pad: F -Pad Estimated Start Date: December 3rd, 2019 Rig: ASR Reg. Approval Req'd? Yes Date Reg. Approval Rec'vd: Regulatory Contact: Tom Fouts Permit to Drill Number: 195-025 First Call Engineer: David Haakinson (907) 777-8343 (0) (307) 660-4999 (M) Second Call Engineer: Ian Toomey (907) 777-8434 (0) (907) 903-3987 (M) AFE Number: 1923061 Job Type: ESP Swap Current Bottom Hole Pressure: Maximum Expected BHP: MPSP: Max Inclination Max Dogleg: BPV Profile: 2,278 psi @ 7,200' TVD 2,302 psi @ 7,200' TVD 1,582 psi 67' @ 6,800' to 7,200' MD 4.6°/100ft @ 7,260' MD 3" CIW Type H Downhole Gauge: 2 -month PBU (5/16/19) 16.09 PPG PBU Extrapolation 16.15 PPG Gas Column Gradient (0.1 psi/ft) Brief Well Summary: MPU producer F-37 well was drilled, perforated, and fractured as a Kuparuk A -sand producer in April 1995. The well was not completed until November 1995 when an ESP completion was run. The last rig-workover was completed in July of 2012 and the well was completed with a P17 ESP with a run life lasted 6.5 years. The well was noted to have past scale problems and thus a scale inhibitor squeeze will be pumped as part of the pre -rig work. The producer was shut-in on 3/9/19 after an apparent motor shaft break. Notes Regarding Wellbore Condition • The 7" production casing passed an MIT to 3,700 prig on 7/3/2012. • Tubing passed a pressure tested to 1300 psig post ESP failure to confirm no tubing leak exists. Objective: • Pull 2-7 8" Tubing String, P17 ESP, and 190 HP motor. • dd Perforation,?rk) • nstall new Baker Hughes 200 HP motor, 169 -stage P17 ESP, and new 2-7/8" tubing. Brief RWO Procedure: 3Zt' S (ct After ESP completion is pulled, RU E -line to perforate the Al sands. /Lp a. PT PCE to 250 psig Low/2,500 prig High b. RIH with GR and CCL for drift and tag with 25' dummy gun i. RIH as deep as possible for drift and tag. Need to ensure that a depth of 12,660' is reached ii. Pull up -hole to 12,250' MD for correlation run and tie into GR/CCL log dated 04-15- 1995. iii. Short Joint (21') located at ±12,342' MD c. RIH with GR, CCL, and guns. i. Currently planning on 3-1/8" or 3-3/8" 6 SPF with 60° phasing. ii. Send gun/tool-string worksheet to engineering for review. d. RIH to ±12,660' MD and log up -hole to ±12,250' MD for confirmation run. i. Contact Engineer David Haakinson (307-660-4999) and Geologist Radu Girbacea (907-230-9490) prior to perforating. ESP Change -Out Ililco p Alaska, LU Well: MPU F-37 Date: 11-12-19 e. RIH to ±12,660' MD and pull up -hole to perforating depth. f. Perforate interval as followed: g. POOH and LD perforating guns. i. Document condition of fired guns including any damage or un -fired charges. h. RD E -line 1. Proposed Schematic Zone Sand Top (MD) Bottom (MD) Top (TVD) Bottom (TVD) Length Kuparuk Al 1 ±12,594 ±12,631' ±7,327' ±7,354' +37' g. POOH and LD perforating guns. i. Document condition of fired guns including any damage or un -fired charges. h. RD E -line 1. Proposed Schematic Mf Odg. KB Bev.: 47/Orig. GL Bev.: 13'(N27E) TD=12,915' (MD) /TD=7,56YUVD) PSTD=12,810'(MD) / PBTD=7,486'(7VD) Milne Point Unit Well: MPU F-37 PROPOSED Last Completed: 7/6/2012 PTD: 195-025 TREE & WELLHEAD OPEN HOLE /CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in 30" Hole 9-5/8" 1 1,322 sx PF'E', 250 sx'G', 250 sx PF'E' in 12-1/4" Hole 7" 1 202 sx Class "G" in 8-1/2" Hole CASING DETAIL Size Tree 3-1/8" WKM 5M ID Top Wellhead 11""5M FMC w/3.5" FMC Tbg. Hanger, 2TA Conductor 91.1/NT80LHE/Weld NSTC Lift Threads, 3" CIW "H" BPV profile Surface OPEN HOLE /CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in 30" Hole 9-5/8" 1 1,322 sx PF'E', 250 sx'G', 250 sx PF'E' in 12-1/4" Hole 7" 1 202 sx Class "G" in 8-1/2" Hole CASING DETAIL Size Type Wt/Grade/Conn ID Top Btm BPF 2TA Conductor 91.1/NT80LHE/Weld N/A Surface 112' N/A 9-5/8" Surface 40/L-805/Btc.8.835 Discharge Head: Surface 6,621' 0.0758 7" Production 26/NT-80/NSCC 6.276 Surface 12,900' 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE8rd 2.441 Surface 1 12,393'0.0058 NOTE: WELL INCLINATION DETAIL 7" Casing PT to 3,700psi from KOP @ 700' 12,400' 7/3/2012 Max Hole Angle = 65 to 67 deg. f/5,800' to 10,850' Hole Angle through perforations =42 deg. JEWELRY DETAIL No Depth Item 1 ±26' XO: 3-1/2" x 2-7/8- 2 ±200' STA 2: 2-7/8"xl" GLM (0.25" Orifice) 3 ±12,197' STA 1: 2-7/8"xl" GLM (Dummy Valve_) 4 ±12,293' 2-7/8" XN Nipple -Min ID= 2.205" 5 712,329' Discharge Head: 6 ±12,331' Pump: 167 -stage Baker Hughes P17 7 ±12,355' Gas Separator 8 ±12,358' Upper Tandem Seal 9 ±12,365' Lower Tandem Seal: 30 ±12,372' Motor: 200 HP Baker Hughes 562SP it 112,388' Sensor&Centralizer- Btm @±12,390' PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Type Date Status 12,498' 12,540' 7,257'7287' 42 3-3/8"/65PF 4/17 Open Kuparuk Al 12,550' 12,594' 7,295' 7!327' 14 3-3/8"/65PF 4/1/95 7/95 Open ±12,594' ±12,631' ±7,327' ±7,354' ±37 TBD Future Future Reference Log: 4/15/1995 AWS GR/CCL -Jumbo Jet Charges EHD = 0.76', TTP = 6.4" - Mid -pert= 12,546M D, 7,289TVD STIMULATION SUMMARY 120,000lbs 16-20 CL ISP 4/22/1995 Kup A sand - Did not screen out. GENERAL WELL INFO API: 50-029-22546-00-00 Drilled and Cased by Nabors 27E -4/11/1995 Run ESP Completion by Nabors 4ES -11/10/1995 ESP Change -out by Nabors 4ES -11/121996 ESP Change -out by Nabors 4ES -6/29/2000 ESP Change -out by Nabors 4ES-6/25/2006 ESP Change -out by Doyon 16 -7/5/2012 Revised By: TDF 11/12/2019 Schwartz, Guy L (CED) From: David Haakinson <dhaakinson@hilcorp.com> Sent: Monday, November 11, 2019 4:19 PM To: Schwartz, Guy L (CED) Cc: Tom Fouts Subject: RE: [EXTERNAL] Re: Sundry #319-265 & #319-471 Scope Additions These will be new perforations. Would you like the perforations submitted in a separate sundry or a re -submittal of the entire RWO procedure (with perforations)? F-37 (PTD 195-025): Zone Sand Top (MD) Bottom (MD) Top (TVD) Bottom (TVD) Length Kuparuk I Al ±12,594 ±12,631' ±7,327' ±7,354' ±37' F-45 (PTD 195-058) : Zone Sand Top (MD) Bottom (MD) Top (TVD) Bottom (TVD) Length Kuparuk I Al ±13,865' ±13,902' ±7,216' ±7,246' +37' David Haakinson Operations Engineer I North Slope Asset'Feam Hilcorp Alaska, LLC Office: (907) 777-8343 1 Cell: (307) 660-4999 dhaakinsona hilcoro.com From: Schwartz, Guy L (CED) [mailto:guy.schwartz@alaska.gov] Sent: Monday, November 11, 2019 4:15 PM To: David Haakinson <dhaakinson@hilcorp.com> Cc: Tom Fouts <tfouts@hilcorp.com> Subject: [EXTERNAL] Re: Sundry #319-265 & #319-471 Scope Additions David, Are these reperfs or new perforations? Please forward your proposed intervals. You may need a sundry.. Guy Schwartz AOGCC Sent from my iPhone On Nov 11, 2019, at 1:30 PM, David Haakinson <dhaakinsonPhilcorD.com> wrote: Mr. Schwartz, Hilcorp Alaska is proposing a scope addition to Sundry # 319-265 (F-37) and Sundry # 319-471 (F-45) to add perforations in the Kuparuk Al sands on both wells. Our intentions are to complete the perforation jobs as the ESPs are out of the well during the RWOs. This change is requested after successful results in the L-41 Al sand perforations completed in September. I have updated our HAK MOC form and have attached both procedures change for your review. Please let me know how you would like us to proceed for approval. Thank you, David Haakinson Operations Engineer I North Slope Asset Team Hilcorp Alaska, LLC Office: (907) 777-8343 1 Cell: (307) 660-4999 dhaakinson(dhilcor .corn The information contained in this e-mail message is confidential information intended only for the use of the recipient(s) named above. In addition, this communication may be legally privileged. If the reader of this e-mail is not an intended recipient, you have received this e-mail in error and any review, dissemination, distribution or copying is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately by return e-mail and permanently delete the copy you received. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. <MP F-45 ESP Changeout & Perf Add Procedure 11-11-19.docx> <MP F-37 ESP Changeout & Perf Add Procedure 11-11-19.docx> THE STATE OIALASKA GOVERNOR MIKE DUNLEAVY Chad Helgeson Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk River Oil Pool, MPU F-37 Permit to Drill Number: 195-025 Sundry Number: 319-265 Dear Mr. Helgeson: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 vv s .00gcc.oloska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 4a� Daniel T. Seamount, Jr. Commissioner T/L� DATED this Z F,ay of May, 2019. gBDMS-d� MAY 3 0 2019 ':<VpD s STATE OF ALASKA MAY 2 3 2019 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC 9n AAc 9F 9An 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing m Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ESP Change -out 10 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska LLC Exploratory ❑ Development ® . Stratigraphic ❑ Service ❑ 195-025 ' 3. Address: 3800 Centerpoint Dr, Suite 1400 6. API Number: Anchorage Alaska 99503 50-029-22548-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 432D Will planned perforations require a spacing exception? Yes ❑ No ® MILNE PT UNIT F-37 ' 9. Property Designation (Lease Number):_ 10. Field/Pool(s): ADL0355018 14fi� 2 Ste% MILNE POINT/ KUPARUK RIVER OIL ' 11. ,441, IT PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth ND: MPSP (psi): Plugs (MD): Junk (MD): 12,915' 7,563' 12,810' 7,486' 1,582 N/A N/A Casing Length Size MD D Burst Collapse Conductor 89 29' 112' 112' N/A N/A Surface 6,586' 9-5/8" 6,621' 4,521' 5,750psi 3,090psi Production 12,86T 7" 12,900' 7,552' 7,240psi 5,410psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): See Schematic See Schematic 2-7/8" 6.5# / L-80 / EUE 8rd 12,393' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): N/A and N/A N/A and N/A 12. Attachments: Proposal Summary p Wellbore schematic ® 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch O+ Exploratory ❑ Stratigraphic ❑ Development ® Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 6/9/2019 OIL © WINJ ❑ WDSPL ❑13Suspended GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative, P GINJ ❑ Op Shutdown p Abandoned p 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Chad Hel eson Contact Name: David Haakinson / Authorized Title: Operations Manager Contact Email: iaEnson0h9orb.com Contact Phone: 777-8343 Authorized Signature: Date: 5/2 312 01 9 COMMISSION USE ONLY Conditions of approval: Notify Commission sothata representative may witness Sundry Number: Plug Integrity ❑ BOP Test ®atMe�chanical Integrity Test 13 Location Clearance ❑ Other: k Z 100 �S I /So I/ 1.6-3 Post Initial Injection MIT Req'd? Yes ❑ No ❑ 7MMS rl4"7 Ay M n ?�'� No Subsequent Form Required: Spacing Exception Required? Yes ❑ yoy 1v - APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: /S 8ubmtl Form and Form 10-403 Revised 4/2017 Approved applicatio sal or ot roLate of approval. Attachments in Duplicate /�� %� S Z`{F% R Hilmm Alaska, LL - ESP Change -Out Well: MPU F-37 Date: 05-20-19 Well Name: MPU F-37 API Number: 50-029-22548-00 Current Status: Shut-in ESP Producer Pad: F -Pad Estimated Start Date: June 91^, 2019 Rig: ASR f - Reg. Approval Req'd? Yes Date Reg. Approval Rec'vd: Regulatory Contact: Tom Fouts Permit to Drill Number: 195-025 First Call Engineer: David Haakinson (907) 777-8343 (0) (307) 660-4999 (M) Second Call Engineer: Ian Toomey (907) 777-8434 (0) (907) 903-3987 (M) AFE Number: Job Type: ESP Swap Current Bottom Hole Pressure: Maximum Expected BHP: MPSP: Max Inclination Max Dogleg: BPV Profile: 2,278 psi @ 7,200' TVD 2,302 psi @ 7,200' TVD 1,582 psi 67° @ 6,800' to 7,200' MD 4.6-/100ft @ 7,260' MD 3" CIW Type H Downhole Gauge: 2 -month PBU (5/16/19) 1 6.09 PPG PBU Extrapolation 16.15 PPG Gas Column Gradient (0.1 psi/ft) Brief Well Summary: , MPU producer F-37 well was drilled, perforated, and fractured as a Kuparuk A -sand producer in April 1995. The well was not completed until November 1995 when an ESP completion was run. The last rig-workover was completed in July of 2012 and the well was completed with a P17 ESP with a run life lasted 6.5 years. The well was noted to have past scale problems and thus a scale inhibitor squeeze will be pumped as part of the pre -rig work. The producer was shut-in on 3/9/19 after an apparent motor shaft break. ✓ Notes Regarding Wellbore Condition • The 7" production casing passed an MIT to 3,700 psig on 7/3/2012. • Tubing passed a pressure tested to 1300 psig post ESP failure to confirm no tubing leak exists. Objective: 0." r4_�_ (3E{P $? S Joh Ems' • Pull 2-7/8" Tubing String, P17 ESP, and 190 HP motor. • Install new Baker Hughes 200 HP motor, 169 -stage P17 ESP, and new 2-7/8" tubing. Pre -Rig Procedure: 1. MIRU Slickline Unit a. Set catcher in XN-Nipple @ 12,292' MD L Note that the last time SL achieved depth on 3/16/19. b. Pull DV from GLM @ 12,141' MD c. Pull Catcher in 2.205 XN Nipple @ 12,292' MD 2. RU LRS and PT lines to 3000 psi. 3. Bullhead 75 bbls of 8.3 ppg source -water down tubing to the formation. J,, /4.. Pump Scale Inhibitor Squeeze down IA. a. Pre -flush: 32.7 bbl source water mixed with 2 drums of WAW5206 b. Scale Inhibitor: 36.7 bbl source water mixed with 4 drums of SCW4004 S. Bullhead 516 bbls of 8.3 ppg source -water down IA to the formation. 6. Confirm well is dead. Freeze protect tubing/casing as needed with 60/40 McOH. ESP Change -Out Well: MPU F-37 I ileorp Alaska, LLQ Date: 05-20-14 a. Freeze protect is up to the discretion of the Wellsite Supervisor depending on timing for arrival of the ASR. 7. RD Little Red Services. S. Clear and level pad area in front of well. Spot rig mats and containment. 9. RD well house and flowlines. Clear and level area around well. 10. RU crane. Set BPV. ND Tree. Inspect the tubing hanger lift thread and note any damage. 11. NU BOPE. RD Crane. 12. NU BOPE house. Spot mud boat. Brief RWO Procedure: 13. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment and lines to returns tank. 14. If needed, bleed off any residual pressure off the IA. Check for pressure and if 0 psi, pull BPV. If needed, kill well w/ 8.3 ppg source -water prior to pulling BPV. 15. Set TWC. 16. Test BOPE to 250 psi Low/ 2,500 psi High, annular to 250 psi Low/ 2,500 psi High (hold each ram/valve i ✓ and test for 5 -min). Record accumulator pre -charge pressures and chart tests. () 1 a. Notify AOGCC 24 hours in advance of BOP test. L5 b. Perform Test per ASR 1 BOP Test Procedure dated 11/03/2015. c. Confirm test pressures per the Sundry Conditions of approval. d. Test VBR ram on 2-7/8" test joint. e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 17. Contingency: If BOPE test fails a. Notify Operations Engineer (Hilcorp), Mr. Guy Schwartz (AOGCC) and Mr. Jim Regg (AOGCC) via email explaining the wellhead situation prior to performing the rolling test. AOGCC may elect to send an inspector to witness test. b. With stack out of the test path, test choke manifold per standard procedure c. Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor the surface equipment for leaks to ensure that the fluid is going down -hole and not leaking anywhere at surface.) d. Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record the pumping rate and pressure. e. Once the BOP ram and annular tests are completed, test the remainder of the system following the normal test procedure (floor valves, gas detection, etc.) f. Record and report this test with notes in the remarks column that the tubing hanger/BPV profile / penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list items, pressures and rates. 18. Bleed any pressure off casing to 500 bbl returns tank. Pull TWC. Kill well w/ 8.3 ppg source -water as needed. 19. Rig up spoolers for ESP #1 cable. a. Baker Hughes representative should be onsite for ESP pull. 20. MU landing joint or spear, BOLDS and PU on the tubing hanger. a. The PU weight= 107K and SO= 70K when landed by Doyon 16 with block weight of 40K. K }Ble p Alaska. LL' ESP Change -Out Well: MPU F-37 Date: 05-20-19 b. If needed, circulate (long or reverse) pill with lubricant, source -water, and/or baraclean pill prior to laying down the tubing hanger. 21. Recover the tubing hanger. Contingency (If a rolling test was conducted): MU new hanger or test plug to the completion tubing. Re -land hanger (or test plug) in tubing head. Test BOPE per standard procedure. a. Evaluate pulled tubing hanger for possible damage. If any damage is found, dispose of tubing hanger and contact well head specialist for replacement. 22. POOH and lay down the 2-7/8" tubing spooling ESP cable. Lay down ESP and motor. -. 5P a. Send all tubing to G&I for washing and disposal. b. Note any sand or scale inside or on the outside of the ESP on the morning report. c. Look for over -torqued connections from previous tubing runs. d. The completion has the following amount of clamps/guards/cap-string: L 193 Cannon Clamps (Note Baker Hughes run report says 193, but Doyon report says 192) ii. 3 Flat Guards iii. 4 Pump Protectolizers iv. 1 Motor Protectolizer 23. PU new ESP and RIH on 2-7/8" 6.5# L-80 tubing. Set base of ESP assembly at ± 12,390' MD. a. Base of ESP centralizer @ ± 12,390' MD b. Motor gauge �SQ c. 200 HP Baker Hughes 562SP Motor d. Gas Separator e. Baker Hughes 169 stage P17 ESP f. Downhole gauge for discharge temperature and pressure. L Connected with a jumper from the lower sensor. Does not require a separate tech -wire. g. 1 joint of 2-7/8", 6.5#, L-80, EUE 8rd tubing h. 2-7/8" XN (2.205" No -Go) Nipple i. 3 joints of 2-7/8", 6.5#, L-80, EUE 8rd tubing j. Lower 2-7/8"x 1" Side -pocket GLM with Dummy GLV k. ± 374 joints 2-7/8", 6.5#, L-80, EUE 8rd tubing I. Upper 2-7/8"x 1" Side -pocket GLM @ ± 200' MD with 0.25" OV m. ± 5 joints 2-7/8", 6.5#, L-80, EUE 8rd tubing 24. PU and MU the tubing hanger with landing joint. a. Note that there will be a 3-1/2" crossover to 2-7/8" tubing below the hanger. 25. Land the tubing hanger and RILDS. Lay down landing joint. Note Pick-up and slack -off weights on tally. 26. Set TWC. 27. RDMO ASR. Post -Rig Procedure: 28. RD mud boat. RD BOPE house. Move to next well location. 29. RU crane. ND BOPE. N Hil.n, Alaska, LG ESP Change -Out Well: MPU F-37 Date: 05-20-19 30. NU the tubing head adapter and tree. Test tubing hanger void and tree to 500 psi low/5,000 psi high. 31. Pull TWC. 32. RD crane. Move returns tank and rig mats to next well location. 33. Replace gauge(s) if removed. 34. Turn well over to production. RU well house and flowlines. Attachments: 1. As -built Schematic 2. Proposed Schematic 3. BOP Schematic 4. Blank RWO MOC Form n Hilcory Alaska, LLC Orig. KB Bev.: 47/ Orig. GL Elev.: 13'(N27E) TD=12,915' (MD) / TD= 7,563'0VD) PBTD=12,81U'(MD) / PBTD= 7,486 M) SCHEMATIC Milne Point Unit Well: MPU F-37 Last Completed: 7/6/2012 PTD: 195-025 TREE & WELLHEAD Tree 1 3-1/8" WKM SM Wellhead 11""5M FMCw/3.5" FMCTbg. Hanger, I Top I NSTC Lift7hreads, 3" C I W "H" BPV profile OPEN HOLE/ CEMENT DETAIL 20"250 sx of Arcticset I (Approx) in 30" Hole 9-5/8" 1,322 sx PF'E', 250 sx'G', 250 sx PF'E' in 12-1/4" Hole 7" 202 sx Class "G" in 8-1/2" Hole CASING DETAIL Size Type Wt/Grade/Conn ID I Top I Btm I BPF 20" Conductor 91.1 / NT80LHE / Weld N/A Surface 112' N/A 9-5/8" Surface 40 / L -80S / Btc. 8.835 Surface 6,621' 0.0758 7" Production 26/NT-80/NSCC 6.276 Surface 12,900' 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE8rd 1 2.441 1 Surface 1 12,393' 0.0058 NOTE: WELL INCLINATION DETAIL 7" Casing PT to 3,700psi from KOP @ 700' 12,400' 7/3/2012 Max Hole Angle= 65 to 67 deg. f/ 5,800'to 10,850' Hole Angle through perforations = 42 deg. JEWELRY DETAIL No Depth Item 1 26' 1 XO: 3-1/2" x 2-7/8" KuparukA GLM DETAIL: 2-7/8" x 1" KBMM 2 139' STA 2: DPSOV - ID = 2.347" 3 12,142' STA I: DGLV - ID = 2.347" 4 12,292' 2-7/8"XN Nipple — Min ID=2.205" 5 12,334' 2-7/8" EUE 8rd Discharge Head GPDIS 6 12,335' Pump: 137-P17 SXD 7 12,354' Gas Separator: GRSFTX AR H6 (400 internals) 8 12,359' Upper Tandem Seal: GSB3DBUT SB/SB PFSA CL6 9 12,365' Lower Tandem Seal: GSB3DBLT 5B/SB PFSA CL6 10 12,372' Motor: KMH CL-6190Hp/ 2,415V/ 48A 11 12,389 Pumpma[e Sensor &Centralizer - Btm @ 12,393' PERFORATION DETAIL Sands Top (MD) Stm (MD) Top (TVD) Btm (TVD) FT Type Date Status KuparukA 12'498 12,540' -12,594' 1 7,257' 1 7,287' 42 3-3/8"/65PF 4/17/95 Open 12,550' 7,295' 7,327' 14 3-3/8"/6SPF 4/17/95 Open Reference Log: 4/15/1995 AWS GR / CCL -Jumbo Jet Charges EH D = 0.76', TTP = 6.4" — Mid-perf=12,546MD, 7,289ND STIMULATION SUMMARY 120,000lbs 16-20 CL ISP 4/22/1995 Kup A sand —Did not screen out. GENERAL WELL INFO API: 50-029-22546-00-00 Drilled and Cased by Nabors 27E - 4/11/1995 Run ESP Completion by Nabors 4ES-11/10/1995 ESP Change -out by Nabors 4ES —11/121996 ESP Change -out by Nabors 4ES — 6/29/2000 ESP Change -out by Nabors 4ES — 6/25/2006 ESP Change -out by Doyon 16 — 7/5/2012 Revised By: TDF 5/17/2019 n corp Aleeka. LLC Orig. KB Elev.: 47/ Ori& GL Bev.: 13'(N27E) TD =12,915' (MD) / TD = 7,563'(ND) PBTD = 12,81(Y(MD) / PBTD= 7,489(TW) Milne Point Unit Well: MPU F-37 PROPOSED Last Completed: 7/6/2012 PTD: 195-025 TREE & WELLHEAD OPEN HOLE / CEMENT DETAIL 20"250 sx of Arcticset I (Approx) in 30" Hole 9-5/8" 1,322 sx PF'E', 250 sx'G', 250 sx PF'E' in 12-1/4" Hole 7" 202 sx Class "G" in 8-1/2" Hole CASING DETAIL Size Tree 3-1/8" WKM 5M ID Top Wellhead 11"" 5M FMC w/ 3.5" FMC Tbg. Hanger, 20" Conductor 91.1 / NT80LHE / Weld NSTC Lift Threads, 3" CIW "H" BPV profile STA 1: 2-7/8"xl" GLM (Dummy Valve) OPEN HOLE / CEMENT DETAIL 20"250 sx of Arcticset I (Approx) in 30" Hole 9-5/8" 1,322 sx PF'E', 250 sx'G', 250 sx PF'E' in 12-1/4" Hole 7" 202 sx Class "G" in 8-1/2" Hole CASING DETAIL Size Type Wt/Grade/Conn ID Top Btm BPF 20" Conductor 91.1 / NT80LHE / Weld N/A STA 1: 2-7/8"xl" GLM (Dummy Valve) 112' N/A 9-5/8" Surface 40 / L -80S / Btc. 8.835 ]uffaceurface 6,621' 0.07587" 7 Production 26/NT-80/NSCC 6.276 urface 12,900' 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd I2.441 Surface 12,393' 0.0058 NOTE: WELL INCLINATION DETAIL 7" Casing PT to 3,700psi from KOP @ 700 12,400' 7/3/2012 Max Hole Angle = 65 to 67 deg. f/ 5,800' to 10,850' Hole Angle through perforations = 42 deg. JEWELRY DETAIL No Depth Item 1 ±26' XO: 3-1/2" x 2-7/8" 2 ±200' STA 2: 2-7/8"xl" GLM (0.25" Orifice) 3 ±12,185' STA 1: 2-7/8"xl" GLM (Dummy Valve) 4 ±12,285' 2-7/8"XN Nipple — Min ID= 1205" 5 ±12,320' Discharge Head: 6 ±12,321' Pump: 167 -stage Baker Hughes P17 7 ±12,341' Gas Separator 8 ±12,344' Upper Tandem Seal 9 ±12,351' Lower Tandem Se al: 10 ±12,358' Motor: 200 HP Baker Hughes 562SP 11 ±12,386' Sensor & Centralizer- Btm @ ±12,390' PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (ND) Btm (TVD) FT Type Date Status i KuparukA 12,498' 12,54V 7,257' 7,287' 423-3/8"/6SPF 4/17/95 Open 12,550' 1 12,594' 7,295' 7,327' 14 3-3/8"/6SPF 4/17/95 Open Reference Log: 4/15/1995 AWS GR / CCL - Jumbo let Charges EHD = 0.76', TTP = 6.4" — Mid-perf= 12,5461vlD, 7,289ND STIMULATION SUMMARY 120,000lbs 16-20 CL ISP 4/22/1995 Kup A sand— Did not screen out. GENERAL WELL INFO API: 50-029-22546-00-00 Drilled and Cased by Nabors 27E - 4/11/1995 Run ESP Completion by Nabors 4ES —11/10/1995 ESP Change -out by Nabors 4ES —11/121996 ESP Change -out by Nabors 4ES-6/29/2000 ESP Change -out by Nabors 4ES-6/25/2006 ESP Change -out by Doyon 16-7/5/2012 Revised By: TDF 5/17/2019 Milne Point ASR Rig 1 BOPE 2018 11" BOPE Head VBR or Pipe Rams 2 1/16 5M Choke Line Valves Updated 5/14/2018 M HHilcorp Alaska, LLC Hilcorp Alaska, LLC Changes to Approved Rig Work Over Sundry Procedure Date: May 231, 2019 Subject: Changes to Approved Sundry Procedure for Well F-37 Sundry #: XXX -XXX Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the rig workover (RWO) "first call' engineer. AOGCC written approval of the change is required before implementing the change. HAK Step Page Date Procedure Change Prepared B Initials HAK Approved B Initials AOGCC Written Approval Received Person and Date Approval: Prepared: vperauvns manager Date vperazions cngmeer Date STATE OF ALASKA . AKA OIL AND GAS CONSERVATION CO ISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: ❑ Abandon ❑ Repair Well ❑ Plug Perforations ❑ Perforate ❑ Re -Enter Suspended Well ❑ Alter Casing ® Pull Tubing ❑ Stimulate - Frac ❑ Waiver ® Other ❑ Change Approved Program ❑ Operation Shutdown ❑ Stimulate - Other ❑ Time Extension Change -Out ESP 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ❑ Development ❑ Exploratory — 195 - 025 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50 029 - 22548 - 00 - 00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL 025509 & 355018 ,. MPF - 9. Logs (list logs and submit electronic and printed data per 20AAC25.071): 10. Field / Pool(s): Milne Point Unit / Kuparuk River Sands 11. Present well condition summary Total depth: measured 12915 feet Plugs (measured) None feet true vertical 7563 feet Junk (measured) None feet Effective depth: measured 12810 feet Packer: (measured) None feet true vertical 7486 feet Packer: (true vertical) feet Casing Length Size MD TVD Burst Collapse Structural Conductor 73' 20" 110' 110' Surface 6585' 9 -5/8" 6621' 4521' 5750 3090 Intermediate Production 12865' 7" 12900' 7552' 7240 5410 Liner RECEIVED JUL 3 1 2012 Perforation Depth: Measured Depth: 12498' - 12594' AOGCC True Vertical Depth: 7257' - 7327' Tubing (size, grade, measured and true vertical depth): 2 -7/8 ", 8.6# L -80 12392' 7180' Packers and SSSV (type, measured and true vertical depth): None 12. Stimulation or cement squeeze summary: Intervals treated (measured): SCANNED MAR 0 4 2013 Treatment description including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 111 345 743 360 272 Subsequent to operation: 103 445 936 70 216 14. Attachments: ❑Copies of Logs and Surveys run 15. Well Class after work: ❑ Exploratory ® Development ❑ Service ❑ Stratigraphic ® Daily Report of Well Operations 16. Well Status after work: • ® Oil ❑ Gas ❑ WDSPL ® Well Schematic Diagram ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Jesse Rosenbaum, 564 -5155 N/A Printed 4 .e J - stu ' Title Drilling Technologist 1 Prepared By Name /Numb Signatur: \ Phone X 564 - 4091 Date 7 / / 12- Joe Lastufka, 564 -4091 Form 10-40 -ed 11/201 � . �c AUG 0 12012 ' ' 1 �' ` ( 2 ! ?�/�� Submit Original Only • • , ‘„, ,,„ , , Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/29/2012 03:00 - 04:15 1.25 RIGD P PRE SUCK OUT SLOP TANK, RD LINES. - PJSM, PREP FOR RIG MOVE. - R/D SLOP TANK, RIG EQUIPMENT. - JACKUP RIG 04:15 - 05:30 1.25 MOB P PRE PULL RIG OFF MPF -96. - MOVE TO MPF -37 - LINE UP TO BACK OVER MPF -37 05:30 - 06:00 0.50 MOB P PRE SPOT RIG OVER MPF -37 WITH TOUR ,PUSHER, WSL AND PAD OPERATOR PRESENT AT 0600 HRS. - LEVEL RIG AND SPOT RIG COMPONENTS. - 0700 HRS TAKE ON 120 DEG. 8.45 PPG SEAWATER TO PITS. - RIG ACCEPTED ON MPF -37 AT 0700 HRS. 06:00 - 10:00 4.00 WHSUR P - DECOMP PJSM, R/U KILL MANIFOLD. - INSTALL 2" 1502 FLANGE ON THE OA. - SPOT CUTTING TANK. 10:00 - 11:30 1.50 WHSUR P DECOMP PBU HARDLINE CREW SPOT AND R/U FLOW BACK TANK AND 2" HARD LINE. - M/U LANDING JOINT WITH FOSV AND TWO CROSS OVERS. 11:30 - 13:00 1.50 WHSUR P DE.COMP- :PJSM, PRESSURE TEST KILL MANIFOLD AND HARD LINE TO TANK - 250 LOW AND 3500 PSI CHARTED BOTH TEST FOR 5 MINUTES. PASSED. 13:00 - 15:00 2.00 WHSUR P DECOMP PJSM, R/U AND TEST DSM LUBRICATOR - 250 LOW AND 3500 PSI FOR 5 CHARTED MINUTES EACH. PASSED. - FUNCTION TEST THE SSV REMOTE PANEL AT THE DRILLER STATION. - PULL TWC AND R/D DSM. - TBG = 1050 PSI - IA = 1050 PSI OA = 60 PSI - SECURE WELL. - L/D LUBRICATOR. - CLOSE OUT WELL WORK PERMIT ON MPF -96. Printed 7/30/2012 10:23:46AM Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 00:00 9.00 WHSUR P DECOMP WAIT TO START WELL KILL AT 06:00 WITH ' WO FIELD SUPERINTENDANT. - LOAD 6400' OF 4" DRILL PIPE INTO PIPE SHED. - REVIEW DDI SOP FOR WELL KILL. - RIG ELECTRICIAN REPLACE SIERRA GAS MONITOR AND CALIBRATE. - NUMBER AND STRAP DRILL PIPE. COMPLETE DDI WORK ORDERS. - CLEAN AND PAINT AROUND RIG. - CONDUCT RIG EVACUATION- FIRE IN BOILER ROOM DRILL AT 22:00 HRS. - AAR: DUE TO POSSIBLE SMOKE, POOR VISIBILITY. - RIG HANDS GATHERED AT MUSTER AREA WITH 5 MIN ESCAPE AIR PACKS. - SIMOPS PERSONNEL ON THE PAD WERE NOTIFIED BY SCS. - TRUCK DRIVERS RESPONDED TO MUSTER AREA. O /A= 60 PSI. I /A= 1150 PSI. TBG= 1150 PSI. 6/30/2012 00:00 - 06:30 6.50 WHSUR P DECOMP WAIT TO KILL WELL AT 06:00 WITH RWO FIELD SUPERINTENDANT. - PJSM, USING HAND TOOLS, CLEANING / PAINTING. - CONTINUE TO WORK ON GENERAL RIG MAINTENANCE. - INSPECT HANDLING EQUIPMENT AND TOOLS. - REVIEW DDI WELL KILL SOP WITH CREW. - PREPARE TOOLS AHEAD OF TIME FOR N/D AND N/U. 06:30 - 07:30 1.00 WHSUR P DECOMP PJSM FOR WELL KILL OPERATIONS. - BP RWO SUPT, WSL, TOOLPUSHER, MUDMAN, TRUCK DRIVERS, SCS AND CREW IN ATTENDANCE. - REVIEW DDI WELL KILL SOP AND WELL PLAN. Printed 7/30/2012 10:23:46AM Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 12:00 4.50 WHSUR P DECOMP WSL AND TOOLPUSHER VERIFY VALVE ALIGMENT, - BLEED GAS FROM IA TO FLOW BACK TANK FROM 1050 PSI TO 0 — 200 PSI. - SITP = 750 PSI SICP = 200 PSI - REPLACE AND TEST VALVE # H-4. WSL AND TOOLPUSHER VERIFY VALVE ALIGNMENT, - BRING PUMP UP TO —900 PSI AND OPEN VALVE# H-4. - PUMP 75 BBLS KWF (8.45 PPG SEAWATER) DOWN THE TBG. ICP = 3 BPM / 900 PSI, W/ 150 PSI MAX DOWN STREAM PRESSURE. - FLUID RETURNS TO SURFACE AFTER 12 BBLS PUMPED. FCP =3 BPM / 700 PSI. - WSL AND TOOLPUSHER VERIFY VALVE ALIGNMENT, - BULL HEAD 15 BBLS KWF DOWN THE TBG AT 3 BPM / 580 PSI . - 1 BPM / 30 PSI INJECTION RATE. 12:00 - 16:30 4.50 WHSUR P DECOMP PJSM WITH B CREW ON WELL KILL. - CONTINUE WELL KILL. - PUMPING 1 BPM / 30 PSI INJECTION RATE. - WSL AND TOOLPUSHER VERIFY VALVE ALIGMENT, - CIRCULATE DOWN THE TBG UP THE IA THROUGHT THE MANUAL CHOKE TO THE FLOW BACK TANK. - ICP = 4'/2 BPM / 1450 PSI - FCP = 2 BPM / 350 PSI MAINTAINING 150 PSI MAX DOWN STREAM CHOKE PRESSURE. - CIRCULATE ADDITIONAL 100 BBLS, UNTIL CLEAN SEWATER RETURNS. 16:30 - 17:00 0.50 WHSUR P DECOMP SHUT -IN WELL FOR 30 MINUTES. - BOTH TBG AND IA ON A SLIGHT VACUUM. - WELL IS DEAD. - TOTAL OF 1180 BBLS 8.5 PPG KWF PUMPED. - 15 BBLS BULLHEADED - TOTAL LOSS TO FORMATION = 340 BBLS. - 290 BBLS CRUDE OIL RECOVERED AND SENT TO MPU ORT. - CLOSE MASTER VALVE. 17:00 - 20:30 3.50 WHSUR P DECOMP PJSM WITH DSM. R/U LUBRICATOR. - NOTIFY AOGCC AT 19:00 HRS L. GRIMALDI WITH UPDATE FOR BOP TEST TIMF - PRESSURE TEST LUBRICATOR TO 250/3500 PSI 5 MIN EACH CHARTED. - INSTALL TWC. - PERFORM 10 MINUTE ROLLING PRESSURE TEST UNDER TWC. - PUMP DOWN VA 8.5 PPG KWF 2.5 BPM TO MAINTAIN 500 PSI. PUMP 44 BBLS. - MONITOR FOR LEAKAGE ABOVE TWC. CHART TEST. - PRESSURE TEST ABOVE TWC TO 250/3500 PSI 5 MIN EACH CHARTED. —� - R/D LUBRICATOR Printed 7/30/2012 10:23:46AM Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- OOW9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 21:30 1.00 WHSUR P DECOMP PJSM, BLOW DOWN LINES. - R/D KILL MANIFOLD. - R/U TO FILL DOWN VA WITH BYPASS. - USE CONTINUOUS HOLE FILL DOWN VA - MONITOR HOLE FILL. 21:30 - 00:00 2.50 WHSUR P DECOMP PJSM FOR N/D TREE AND N/U BOPE. - FMC BLEED TREE VOID. WITH 2 BARRIERS IN PLACE, MONITORED 8.5 PPG KWF. TESTED TWC AND HANGER SEALS. - N/D TREE AND ADAPTOR FLANGE. - FMC VERIFY TBG HANGER THREADS ARE NOT DAMAGED. - HANGER THREADS 3.5" NSTC. 8.5 TURNS. - FMC FUNCTION LDS ONE AT A TIME. - O /A= 100 PSI. WHILE FILLING DOWN VA WELL TOOK APPROX 20 BPH - LAST 10 HRS WELL TOOK A TOTAL OF 200 BBLS. 7/1/2012 00:00 - 03:00 3.00 BOPSUR P DECOMP PJSM, N/U 4 STACK PREVENTER. - RECORD STACK MEASURMENTS. PRESSURE UP ACCUMULATOR. - FUNCTION BOP COMPONENTS. - BLIND RAM DOOR HINGE WEEPING HYD FLUID. - SHUT DOWN ACCUMULATOR AND BLEED OFF PRESSURE. - CONTINUOUS HOLE FILL DOWN VA - MONITOR HOLE FILL. - WELL TAKING 18 BPH 03:00 - 04:30 1.50 BOPSUR N RREP DECOMP SHUT DOWN ACCUMULATOR. - BLEED OFF ACCUMULATOR PRESSURE. - PJSM FOR BOP DOOR HINGE SEAL REPAIR. - REMOVE ACCUMULATOR HOSES FROM BLIND RAMS. - DDI RIG MECHANIC C/O LOWER DOOR HINGE SEALS. - PRESSURE UP ACCUMULATOR. - FUNCTION AND TEST DOOR HINGE SEAL. 04:30 - 06:00 1.50 BOPSUR P DECOMP PJSM FOR TESTING BOPE. - FILL STACK WITH WATER. - R/U BOP TEST EQUIPMENT. - AOGCC LOU GRIMALDI WILL WITNESS BOP TEST. 06:00 - 07:15 1.25 BOPSUR P DECOMP STAGE CENTRILIFT EQUIPMENT ON RIG FLOOR - INSPECT ESP SHEAVE. - PERFORM DERRICK INSPECTION. - M/U CROSS OVERS ON OPSO LOPSO LUBRICATOR - AND DRIFT WITH 3" TWC. 07:15 - 07:30 0.25 BOPSUR P DECOMP PJSM, CREW REVIEW TESTING BOPE SOP. - WORKING WITH HI- PRESSURE - DROPPED OBJECTS - FOLLOWING PROCEDURES - REPEAT THE COMMAND ON THE RADIO. Printed 7/30/2012 10:23:46AM - 3¢ 8 s a w Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- OOW9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 13:00 5.50 BOPSUR P DECOMP TEST BOP'S AS PER DOYON TEST PROCEDURE vQ - TEST ALL BOPE AND CHOKE MANIFOLD VALVES TO 250 PSI LOW, 3500 PSI HIGH. 5 . MINUTES, CHARTED A: - TEST ANNULAR USING 2 7/8" TEST JOINT. - TEST VBR PIPE RAMS USING 2 7/8" AND 4" TEST JOINTS. - TEST BOTH SETS OF 2 7/8" AND 4" FLOOR VALVES. - TEST USING FRESH WATER. - PERFORM DRAW DOWN TEST ON ACCUMULATOR - 200 PSI INITIAL PRESSURE RECOVERY = 16 SECONDS - FULL PRESSURE RECOVERY = 92 SECONDS MAINTAIN CONTINUOUS HOLE FILL AT 16 -18 BPH W/ 8.5 SEAWATER - TEST WITNESSED BY AOGCC STATE INSPECTOR LOU GRIMALDI. WSL AND MPU WELL OPS COORDINATOR COMPLETE FACE TO FACE HAND OVER OF MPF -96 FOLDER. - 16 BPH LOSS RATE WITH CONTINUOUE HOLE FILL. 13:00 - 14:00 1.00 BOPSUR P DECOMP R/D BOP TEST EQUIPMENT. - BLOW DOWN LINES. 14:00 - 15:30 1.50 BOPSUR P DECOMP PJSM WITH DSM AND CREW. - R/U AND TEST LUBRICATOR TO 250/3500 PSI 5MIN EACH. - CHART RECORD TEST. - WITH 2 BARRIERS IN PLACE, 8.5 PPG KWF AND TESTED BOPE. - PULL TWC. TBG ON VAC. - L/D LUDRICATOR. 15:30 - 16:30 1.00 BOPSUR P DECOMP PJSM WITH CENTRILIFT AND CREW. - CHECK CENTRILFT ESP SHEAVE CERTS- CURRENT. - REVIEW HANGING SHEAVE, DROPPED OBJECT MITIGATION. - HANG ESP SHEAVE IN DERRICK WITH SECONDARY RESTRAINT. - R/U E- TRUNK. THREAD -ROPES TO SHEAVE. 16:30 - 16:45 0.25 BOPSUR P DECOMP PJSM, ON PULLING TBG HANGER TO RIG FLOOR AND UD SAME. - WSL, TOOLPUSHER, CENTRALIFT REP, FMC REP. AND CREW IN ATTENDANCE - REVIEW DDI SOP FOR PULLING HANGER WITH ESP. - REVIEW STEPS IN WELL PLAN FOR PULLING ESP COMPLETION. - DISCUSS WELL CONTROL PLAN WHILE PULLING ESP. - REVIEW CONTINUOUS HOLE FILL WITH CURRENT LOSSES. Printed 7/30/2012 10:23:46AM . Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:45 - 18:00 1.25 BOPSUR P DECOMP R/U 3 1/2" LANDING JT WITH FOSV AND CLOSE SAME. - PERFORM ESP CABLE CUTTING DRILL WITH FLOOR CREW AND CENTRALIFT. - M/U LANDING JT TO HANGER. - CLOSE VA VALVES. R/D VA FILL UP LINE. - FMC REP BOLDS. WSL VERIFY NO TRAPPED PRESSURE UNDER TBG HANGER. HANGER OFF SEAT 118K. BROKE OVER 120K. P/U WT 111K. (40K BLOCK WT INCLUDED) - SO WT 70K (40K BLOCK WT INCLUDED) - PULL TBG HANGER TO RIG FLOOR. - OPEN TIW,'UD HANGER AND LANDING JT. 18:00 - 19:00 1.00 BOPSUR P DECOMP M/U FOSV, HEADPIN AND CIRC HOSE. - CLOSE ANNULAR. - BULLHEAD 75 BBLS 8.5 PPG KWF DOWN TBG. - PUMP 3 BPM AT 720 PSI. FCP 2.5 BPM AT 900 PSI. SHUT DOWN PUMP. 19:00 - 20:00 1.00 BOPSUR P DECOMP PERFORM EXHALE TEST. START, VA 900 PSI TO 150 PSI. 5 MIN. AFTER 10 MIN VA 30 PSI. - REDUCING TO 0 PSI. - TOTAL FLUID BLED BACK 3.4 BBLS. - WELL ON VAC. - OPEN CHOKE. OPEN ANNULAR 20:00 - 20:30 0.50 BOPSUR P DECOMP R/D CIRC HOSE, HEAD PIN AND FOSV. - MONITOR WELL, CONTINUE ON VAC. 20:30 - 00:00 3.50 PULL P DECOMP POH WITH ESP COMPLETION AND STAND IN DERRICK - 2 7/8" 6.5#, EUE 8RD TBG. - SPOOLING ESP CABLE. - CONTINUOUS HOLE FILL WITH 8.5 PPG KWF 20 BPH. - FROM 12405' TO 10020' MD. - IN THE LAST 24 HRS WELL TOOK 452 BBLS 8.4 PPG KWF. 7/2/2012 00:00 - 07:30 7.50 PULL P DECOMP POH WITH ESP COMPLETION AND STAND IN DERRICK - 2 7/8" 6.5#, EUE 8RD TBG. - SPOOLING ESP CABLE. - CONTINUOUS HOLE FILL WITH 8.5 PPG KWF 20 BPH. - FROM 10020' TO 95' MD. - MONITOR WELL PRIOR TO ESP ACROSS THE BOP. - UD 3 BAD JOINTS 2 -7/8" EUE TBG (OVER TORQUED) - RECOVERED 180 CANNON CLAMPS. 07:30 - 09:30 2.00 PULL P DECOMP PJSM, POH UD ESP ASSEMBLY - DRAIN SERVICE OIL FROM ESP ASSEMBLY. - B/O AND UD ESP ASSEMBLY. - LIGHT SCALE NOTED. - BURN SPOT THROUGH ESP CABLE —2.5 FT. ABOVE THE M.E.L. - TOP MOTOR LOCKED -UP. Printed 7/30/2012 10:23:46AM ha �• Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- OOW9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations 09:30 - 10:30 1.00 (hr) (ft) PULL P DECOMP CLEAN AND CLEAR RIG FLOOR - REMOVE ESP CABLE TRUNK &SHEAVE FROM DERRICK. 10:30 - 11:00 0.50 BOPSUR P DECOMP INSTALL WEAR RING ID. = 9.125" _0 B/O 5' FOSV FROM LANDING JOINT USED N MPF -96. - BECAUSE IT WAS UNSAFE TO BREAK DOWN THE 46 FOOT ASSEMBLY AFTER LANDING COMPLETION. 11:00 - 12:00 1.00 EVAL P OTHCMP PJSM, PU / MU 7 ' CHAMP TEST PACKER. - HES REP PRESENT. 12:00 - 12:30 0.50 EVAL P OTHCMP PJSM, PERFORM PRE HES TOUR CHECKS _ RIG SERVICE 12:30 17:30 5.0 EVAL P OTHCMP PJSMRIH , EST 7' TO SURFACE CSG. - WITH 7" HES TO T CHAMP PACKER :SI/ R 2 -7/8" 6.5# TO FR5993' M RICK D. - 63 M ANDS + A. SINGLE JT. - MATAI 20 BPH ON HOLE FILL WITH EUE 8.45# SEAATER. 17:30 - 18:30 1.00 EVAL P OTHCMP -/n. RIH WITH 280' 4" TO 6276 /I1 X ' MD. - NOISE IN DRAWORKS DYNO- MATIC. DRILL PIPE - STOP P/U DP. - M/U FOSV. i p C DDI RHIC. 0 5.50 EVAL -- N' RREP OTHCMP JSM , DDI OUT HAZARD IG RECOGNITIOAN N. 18:30 - 00:0 LOCK AND TAG OUT MEC DRAWORKS. DDI RIG MECHANIC INSPECT BEARINGS ON DYNO -MATIC SHAFT. DYNO MATIC SHAFT BEARING FAILURE. - WITH DDI FIELD SUPERINTENDANT REMOVE DYNO -MATIC AND LOAD OUT. REPLACEMENT DYNO MATIC ON LOCATION AT 21:30 HRS - LOO TC OO RG R. - USE CONTINUOUS HOLE FILL I 8.5 PPG - MONITOR AD DYN HOLE FIL L, NT MAINTAIN 20 FLOO BPH KWF. HOLE FILL. :ER HOLE FILL ETURNS NOTED. OPEN INCREASE FOSV AND MONITOEVERY R TBG HR VUNTIL ME OLU VERY HR. TBG REMAINS FULL. - RWO FIELD SUDA STATUS NOTIFY AT 19:15 FIE HRS. _ LOSSES TO WELL IN LAST PERINTEN 12 HRS = 211 NT OF BBLS 8.5 PPG KWF. - LOSSES TO WELL IN LAST 24 HRS= 545 BBLS 8.5 PPG KWF. Printed 7/30/2012 10:23:46AM :, m> Spa a Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/3/2012 00:00 - 10:00 10.00 EVAL N RREP OTHCMP PJSM FOR INSTALLING REPLACMENT DYNO - MATIC. - LOAD NEW DYNO -MATIC ONTO RIG FLOOR. - CLEAN AND PREP INSTALLATION AREA. - CLEAN AND INSTALL FEET FROM OLD DYNO - MATIC. - SHIM AND ALIGN DYNO - MATIC. R/U ELECTRICAL. - TEST DYNO - MATIC. CLEAN UP TOOLS AND EQUIPMENT. - USE CONTINUOUS HOLE FILL 8.5 PPG KWF. - MONITOR HOLE FILL, MAINTAIN 20 BPH HOLE FILL. - INCREASE HOLE FILL EVERY HR UNTIL RETURNS NOTED. - OPEN FOSV AND MONITOR TBG VOLUME EVERY HR. - TBG REMAINS FULL. 10:00 - 12:00 2.00 EVAL P OTHCMP PJSM. RIH WITH 7" CHAMP PACKER. P/U 4" DRILLPIPE FROM PIPE SHED. - USE CONTINUOUS HOLE FILL. WELL CONTINUES TAKING 20 BPH 8.4 PPG KWF. - RIH FROM 6276' TO 8078' MD. - LAST 12 HRS WELL TOOK 240 BBLS 8.4 PPG KWF. 12:00 - 13:00 1.00 EVAL P OTHCMP CREW CHANGE. PJSM FOR P/U DRILL PIPE. - SERVICE RIG AND INSPECT EQUIPMENT. - DDI FLOORHAND ON 24 HR BED REST DUE TO BACK PAIN. 13:00 - 19:30 6.50 EVAL P OTHCMP RIH WITH 7" CHAMP PACKER. - P/U 4" DRILLPIPE FROM PIPE SHED. - USE CONTINUOUS HOLE FILL. - WELL CONTINUES TAKING 20 BPH 8.4 PPG KWF. - RIH FROM 8078' MD. TO 12400' MD. 19:30 - 20:00 0.50 EVAL P OTHCMP M/U FOSV, 5' PUP. M/U TOP DRIVE. - CIRCULATE 5 BPM AT 730 PSI , RECIPROCATE PIPE 10' - CLEANING UP SET DEPTH. - P/U WEIGHT = 137K. S/O WEIGHT = 106K. ( INCLUDES 40K TOP DRIVE WT ) Printed 7/30/2012 10:23:46AM Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 22:30 2.50 EVAL P OTHCMP PJSM, REVIEW DDI SOP FOR CSG TEST. - HES REP, WSL, TOOLPUSHER, AND RIG CREW IN ATTENDANCE. - CONDUCT MIT / IA TEST. - SET 7" CHAMP PACKER AT 12400' MD. - ROTATE PIPE 6 TURNS AND SET DOWN 20K. - CLOSE UPPER PIPE RAMS. CIRCULATE VA THROUGH CEMENT LINE WITH RETURNS OUT CHOKE. SHUT IN CHOKE ' ► • • : - • . • 3 00- PSI. - PUMP 5.1 BBLS. SHUT IN CEMENT LINE. - QHART RECORD TEST FOR 30 MINI ITF3 BLEED OFF PRESSURE THROUGH CHOKE. - 5.2 BBLS BLED BACK. - PASSING PRESSURE TEST. - SUBMIT TEST RESULTS TO WTL AND ODE. - RECIEVE APPROVAL TO PROCEED WITH WELL OPS. FROM WTL M. SHULTZ. 22:30 - 23:00 0.50 EVAL P OTHCMP PULL 4K OVER, RELEASE CHAMP PACKER. ■ - L/D PUP AND FOSV. BLOW DOWN TOP DRIVE. 23:00 - 00:00 1.00 EVAL P OTHCMP PJSM, REVIEW DDI SOP FOR CUTTING AND SLIPPING DRILLING LINE. - M/U TOP DRIVE. - CUT 202' DRILLING LINE. - USE CONTINUOUS HOLE FILL. - WELL CONTINUES TAKING 20 BPH 8.4 PPG KWF. - LOSSES TO WELL IN LAST 12 HRS= 201 BBLS 8.4 PPG KWF. - LOSSES TO WELL IN LAST 24 HRS= 441 BBLS 8.4 PPG KWF 7/4/2012 00:00 - 00:30 0.50 EVAL P OTHCMP PJSM. FINISH CUTTING DRILLING LINE. - BREAK OFF TOP DRIVE. - RESET AND TEST CROWN -O- MATIC. - USE CONTINUOUS HOLE FILL. - WELL CONTINUES TAKING 20 BPH. 00:30 - 09:00 8.50 EVAL P OTHCMP PJSM FOR POH WITH 7" CHAMP PACKER. - REVIEW SWABBING POTENTIAL. - POH FROM 12400' TO 6000' MD.- L/D 4" DRILL PIPE, - F/ 6000' POH ON 2 -7/8" TBG RACKING BACK IN DERRICK - USE CONTINUOUS HOLE FILL @ 20 BPH - SPOTTING SLB WIRELINE TRUCKS 09:00 - 10:00 1.00 EVAL P OTHCMP AT SURFACE WITH HES CHAMP PACKER - BREAK OUT & LD PACKER PER HES REP - PULL WEAR RING - RD SHEAVE FROM DERRICK 10:00 - 14:00 4.00 EVAL P OTHCMP PJSM FOR MAKING UP DUTCH RISER AND LUBRICATOR - SET TEST PLUG - MAKE UP DUTCH RISER WITH SWS LUBRICATOR - MU WIRELINE HEAD. 14:00 14:30 0.50 EVAL P ■- OTHCMP PRESSURE N RISER AND LUBRICATOR - 250 PSI LOW W AND 3500 PSI HIGH, 5 CHARTED MIN, GOOD TEST Printed 7/30/2012 10:23:46AM Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 16:00 1.50 EVAL P OTHCMP DISCONNECT LUBRICATOR AT THE QUICK CONNECT - PULL DUTCH RISER & TEST PLUG, RE INSTALL DUTCH & CONNECT LUBRICATOR - RE PRESSURE TEST AT THE QUICK TEST SUB CONNECTION 16:00 - 23:30 7.50 EVAL P OTHCMP PDS LOGGING . - RIH WITH MTT LOG TOOL. - LOG 2 PASSES FROM 1000' - L/D MTT LOG TOOL. - M/U PDS CALIPER LOG. - PRESSURE TEST QTS TO 250/3500 PSI. - LOG 1 PASS FROM 1000' WITH PDS CALIPER LOG. - DOWNLOAD DATA. PJD LOGGING TOOLS. - USE CONTINUOUS HOLE FILL WITH 8.5 PPG KWF 20 BPH. - LOSSES TO WELL IN LAST 12 HRS= 124 BBLS. - LOSSES TO WELL IN LAST 24 HRS= 384 BBLS. 23:30 - 00:00 0.50 EVAL P OTHCMP PJSM, R/D SLICKLINE. 7/5/2012 00:00 - 00:30 0.50 EVAL P OTHCMP PJSM, CONTINUE TO R/D SLICKLINE. - L/D LUBRICATOR AND DUTCH RISER. 00:30 - 01:00 0.50 RUNCOM P RUNCMP PJSM WITH CENTRALIFT REP, WSL, TOOL PUSHER AND CREW. - FOR P/U ESP MOTOR ASSEMBLY. REVIEW DDI SOP. - REVIEW WELL PLAN STEPS AND COMPLETION TALLY - DISCUSS PLAN FOR NON SHEARABLES ACROSS BOP. - CHECK CENTRILFT ESP SHEAVE CERTS- CURRENT. - REVIEW HANGING SHEAVE, DROPPED OBJECT MITIGATION. 01:00 - 02:00 1.00 RUNCOM P RUNCMP HANG ESP SHEAVE IN DERRICK WITH SECONDARY RESTRAINT. - R/U E- TRUNK. THREAD ESP CABLE TO RIG FLOOR. - LOAD MOTORS IN PIPE SHED. - M/U 3 1/2" LANDING JT WITH NSCT XO. 02:00 - 04:30 2.50 RUNCOM P RUNCMP P/U ESP MOTOR ASSEMBLY AS PER CENTRALIFT REP. - CENTRALIZER, PUMP MATE SENSOR, KMH 190 HP MOTOR, LOWER AND UPPER TANDEM SEALS, GAS SEPERATOR, PUMP AND DISCHARGE HEAD. - FILL PUMP WITH MINERAL OIL AS PER CENTRALIFT REP. - 3 FLAT GUARDS, 5 PROTECTOLIZERS. Printed 7/30/2012 10:23:46AM Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 12:00 7.50 RUNCOM P RUNCMP RIH WITH 80 STANDS — 7600' OF 2 7/8" ESP COMPLETION AS PER TALLY., - RIH 2.5 - 3 MINUTES PER STAND. - INSTALL CANNON CLAMP ON EVERY COLLAR FOR THE FIRST 9 JTS. - THEN INSTALL CANNON CLAMPS EVERY OTHER JT. MONITOR UNSPOOLING ESP CABLE. - USE CAUTION SETTING SLIPS- NOT TO DAMAGE ESP CABLE. CONTINUOUS HOLE FILL WITH 8.5 PPG KWF 20 BPH. - FLUSH TBG AND TEST CONDUCTIVITY ON ESP ELECTRIC CABLE EVERY 2000'. - LOSSES TO WELL LAST 12 HRS= 242 BBLS 8.5 PPG KWF. 12:00 14:00 2.00 RUNCOM P RUNCMP REEL TO REEL SPLICE - TROUBLE WITH THE INSULATION AROUND THE WIRES_ CENTRILIFT CALLED TOWN REP AND DECISION WAS MADE TO POH — 500' AND CHECK FOR BETTER ESP CABLE. 14:00 - 16:00 2.00 RUNCOM N SFAL RUNCMP PUT REEL BACK IN THE SPOOLER, HELD PRE JOB FOR CHANGE OF SCOPE POOH 5 STANDS , 470' - CHECK ESP CABLE INSULATION, CABLE IS GOOD HERE - SECURE CABLE AND REMOVE SPOOL FOR NEW ONE 16:00 - 19:00 3.00 RUNCOM P RUNCMP REEL TO REEL SPLICE - SPLICE MADE AT 75 OF 128 STANDS IN THE HOLE , @ 7,160' - CONTINUOUS HOLE FILL STILL AT 20 BPH 19:00 00:00 5.00 RUNCOM P RUNCMP CONTINUE RIH FROM 7160' TO 12392' RIH 2.5 - 3 MINUTES PER STAND. - INSTALL CANNON CLAMPS EVERY OTHER JT. - MONITOR UNSPOOLING ESP CABLE. - USE CAUTION SETTING SLIPS- NOT TO DAMAGE ESP CABLE. - CONTINUOUS HOLE FILL WITH 8.5 PPG KWF 20 BPH. - FLUSH TBG AND TEST CONDUCTIVITY ON ESP ELECTRIC CABLE EVERY 2000'. - TOTAL= 192 CANNON CLAMPS. - TOTAL= 387 JTS 2 7/8" 6.5# EUE 8RD L80 TBG. - CIRCULATE 1 BPM @ 1000 PSI. - LOSSES TO THE WELL LAST 12 HRS= 190 BBLS 8.5 PPG KWF. - LOSSES TO THE WELL LAST 24 HRS= 432 BBLS 8.5 PPG KWF. Printed 7/30/2012 10:23:46AM Common Well Name: MPF -37 AFE No Event Type: WORKOVER (WO) Start Date: 6/28/2012 End Date: X4- 00W9X -E: (922,236.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/26/2000 12:00:00AM Rig Release: 7/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @46.33ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/6/2012 00:00 - 01:30 1.50 RUNCOM P RUNCMP PJSM, INSTALLING TWC, M/U TBG HANGER, TERMINATE ESP CABLE. - CENTRALIFT REP, FMC REP, WSL, TOOLPUSHER, RIG CREW IN ATTENDANCE. - INSTALL TWC IN TBG HANGER ON FLOOR WITH FMC REP. - M/U 13 5/8" X 3 112" NSCT TBG HANGER. - M/U LANDING JT. - P/U WT. = 107K. S/O WT. = 80K ( INCLUDES 40K TOP DRIVE WT. ) ATTEMPT TO TERMINATE ESP CABLE. - WHILE TERMINATING CABLE, DAMAGED SPLICE PIN. 01:30 - 05:00 3.50 RUNCOM N SFAL RUNCMP CENTRILIFT TO SHOP FOR ANOTHER SPLICE PIN. KIT. - SPLICE PIG TAIL ONTO ESP LINE 8' LOWER ON PUP UNDER HANGER. - USE CONTINUOUS HOLE FILL 20 BPH 8.5 PPG KWF. 05:00 - 06:00 1.00 RUNCOM P ® RUNCMP CENTRILIFT TERMINATE ESP CABLE TO HANGER. 06:00 - 06:30 0.50 RUNCOM P - RUNCMP LAND HANGER WITH BOTTOM AT 12,392' MD - FMC TO RILDS 06:30 - 07:00 0.50 __ RUNCOM P RUNCMP PRESSURE TEST TWC - ROLLING TEST FROM BELOW, PUMPED AT 2.7 BPM WITH 680 PSI. CHARTED 5 MIN. TOTAL 44 BBLS PUMPED - TEST FROM ABOVE , 250 PSI LOW AND 3500 PSI HIGH, 5 MIN CHARTED. ALL TESTS GOOD 07:00 - 10:00 3.00 BOPSUR P - RUNCMP ND BOPS - BD CHOKE AND KILL LINES 10:00 - 14:30 4.50 WHSUR P RUNCMP NU 2- 9/16" TREE, TBG ADAPTER AND FLANGE. - FMC PRESSURE TEST TREE AND HANGER VOID TO 5000 PSI FOR 5 CHARTED MIN. - CENTRILFT FINAL ESP CONDUCTIVITY TEST AT HANGER PENTRATOR. - PHASE TO PHASE ALL 3= 4.6 - PHASE TO GROUND= 518 MEG. 14:30 - 16:30 2.00 WHSUR P RUNCMP PJSM. M/U LUBRICATOR. - TEST LUBRICATOR WITH DIESEL TO 250/3500 PSI FOR 5 MIN CHARTED. - PULL TWC. TBG ON VAC. - TEST LUBRICATOR WITH DIESEL TO 250/3500 PSI FOR 5 MIN CHARTED. - SET BPV. 16:30 - 17:30 1.00 WHSUR P RUNCMP - PERFORM ROLLING TEST UNDER BPV TO 500 PSI. - PUMP 3 BPM 440 PSI, ENDING 2 BPM 720 PSI FOR 10 MIN. CHARTED. - CALLED THE AOGCC FOR 24 NOTICE OF INITIAL BOPE TEST FOR MPE -04 - JEFF JONES CALLED BACK AND WAIVED WITNESS TO THE TEST 17:30 - 19:00 1.50 RIGD P RUNCMP PJSM, BLOW DOWN LINES. - R/D ANNULAS VALVE AND INSTALL FLANGE. - SECURE TREE AND CELLAR. - CLEAN PITS AND CUTTINGS BOX. - RIG RELEASED FROM MPF -37 AT 19:00 HRS. Printed 7/30/2012 10:23:46AM 4 Tree: 3 1/8" WKM - 5M• Orig.. elev. = 45.5' (N 27E) Wellhead: 11" 5M FMC MPU F- 37 Orig. GL elev. = 13.0' w/ 3.5" FMC Tubing Hanger, NSTC Orig. KB elev. = 47.0' (N 27E) lift threads, 3" CIW 'H' BPV profile DF to 7" hng. = 35A8' (N 27E) 7" Csg test to 3700 psi 20 ", 91.1 ppg, 113' from 12,400' on 7/3/12 NT8OLHE ` Camco 2 7/8" x 1" Liiiiiii KBMM GLM 139' 9 5/8 ", 40 ppf, L -80 Btrs, 6621' I It k f KOP @ 700' MD Max. Hole Angle = 65 to 67 deg. f/ 5800' - 10,850' Hole angle through perfs = 42 deg. 2 7/8" 6.5 ppf, L -80, 8rd EUE tbg. (drift ID = 2.347 ", cap. = 0.0058 bpf) 7" 26 ppf, L -80, BTC prod. casing At,, (drift ID = 6.151 ", cap. = 0.0383 bpf) (cap w/ 2 7/8" Tbg inside = 0.02758 bpf) Camco 2 7/8" x 1" 12,141 ' 1 KBMM GLM 2 -7/8" 2.313" XN Nipple 12,292' Stimulation Summary y 2.250" No -Go ID 120 M Lbs. 16 -20 CL ISP 4/22/95 ' Kup "A" Sand - did not Screen out Centrilift SXD Pump 137 -P17 12,335' •,,,,, Gas Separator GRSFTX 12,354' • Perforation Summary REF LOG: 4/15/95 AWS GR /CCL wit Centrilift Tandem seal section 12,359' GSB3DB UT /LT SB /SB PFSA CL6 ANL Gun SPF Interval (TVD) Centrilift KMHGAS 562 series. 3 3/8" 6 12,498' - 12,540' (7252'- 7284') Ifr 190 hp. motor, 2415v. / 48 amp 12,372' " 12,550'- 12,594' (7294'- 7326') ME Centrilift PumpMate XTO Sensor w/ 6 fin centralizer 12,389' Jumbo Jet charges EHD = 0.76 ", TTP = 6.4" XTO TVD = 7.178' P H mid -perf = 7289' tvd 12546' md. N 0 Orig. PBTD 12,815' 4 116. 7" 26 ppf, NT-80S NSCC 12,900' DATE REV. BY COMMENTS MILNE POINT UNIT 10/08/95 JBF Pre -RWO Handover 11/10/95 JBF ESP Completion by Nabors 4 ES WELL F -37 11/13/96 MDO 07/01/00 ESP RWO Nabors 4 ES API NO: 50- 029 -22548 06/25/06 KDC ESP Completion 4ES 7/6/12 Hulme ESP RWO Doyon 16 BP EXPLORATION (AK) • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission S O 333 West 7 Avenue Anchorage, Alaska 99501 37 Subject: Corrosion Inhibitor Treatments of MPF -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) I MPF -Pad 10/29/2011 Corrosion Initial top of Final top of Cement top off Corrosion inhibitor/ Well Name PM # API # cement Vol. of cement pumped cement date inhibitor sealant date ft bbls ft gal MPF -01 1950450 50029225520000 10.2 N/A 10.2 N/A 122.4 8/7/2011 MPF-02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011 MPF -05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011 MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 8/2/2011 MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/9/2011 MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 812/2011 MPF -13 1950270 50029225490000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011 MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011 MPF -18 1961000 50029226810000 8.3 WA 8.3 N/A 91.8 8/2/2011 MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011 MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.8 8/1/2011 MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011 MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011 MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011 MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011 MPF -33 2010620 50029226890000 23 Need top job MPF -34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011 '" MPF-37 1950250 50029225480000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF-38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011 MPF-41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011 MPF-42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011 MPF -45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/11/2011 MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A N/A MPF-49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011 MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011 MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011 MPF -54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/1/2011 MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011 MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF-61 1951170 50029225820000 62 Need top job MPF-62 1951610 50029226090000 2.0 NN 2.0 N/A 13.6 9/1/2011 MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011 MPF-69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011 MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/31/2011 MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF -77 1951360 50029225940000 0.2 N/A 0.2 N/A 6.8 10/5/2011 MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011 MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 68 8/3/2011 MPF-80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011 MPF-81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011 MPF -82 2091350 50029229710000 1.7 N/A 1.7 N/A 15.3 8/3/2011 MPF-83 2000930 50029229630000 1.2 N/A 1.2 N/A 13.6 8/32011 MPF -84B 2001760 50029229310200 1.2 N/A 1.2 N/A 10.2 8132011 MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/12011 MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/12/2011 MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/13/2011 MPF -88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011 MPF -89 2050900 50029232680000 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF -90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011 MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011 MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011 MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011 MPF -94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011 MPF -95 1981790 50029229180000 0.5 WA 0.5 N/A 3.4 8/13/2011 MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/12011 MPF -99 2061560 50029233320000 1.3 N/A 1.3 N/A 11.9 8/112011 . STATE OF ALASKA . ALA OIL AND GAS CONSERVATION COM ION REPORT OF SUNDRY WELL OPERATIONS Revision: 08/01/06 Correct Production Data 1. Operations Performed: o Abandon 181 Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Alter Casing 181 Pull Tubing o Perforate New Pool o Waiver 181 Other o Change Approved Program o Operation Shutdown o Perforate o Time Extension Change-Out ESP 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. 181 Development o Exploratory 195-025 3. Address: o Stratigraphic o Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22548-00-00 ' 7. KB Elevation (ft): 46.43 9. Well Name and Number: MPF-37 8. Property Designation: 10. Field / Pool(s): DÞ'- '.Á.l> :. ß ..¡:: .6 ADL 355018 Milne Point Unit / Kuparuk River SaAdS 11. Present well condition summary Total depth: measured 12915 ' feet true vertical 7563 ' feet Plugs (measured) None Effective depth: measured 12810 feet Junk (measured) None true vertical 7486 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 73' 20" 110' 110' Surface 6585' 9-518" 6621' 4521' 5750 3090 Intermediate Production 12865' 7" 12900' 7552' 7240 5410 Liner SCIÌ\NN~Jj r ;"1 \ j,.' Jo..,\-..,' ..,...........- < " Perforation Depth MD (ft): 12498' - 12594' Perforation Depth TVD (ft): 7257' - 7327' 2-7/8",6.5# L-80 12406' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): None RECEIVED 12. Stimulation or cement squeeze summary: AUG 0 2 2006 Intervals treated (measured): Alaska Oil & Gas Cons Comm' . Treatment description including volumes used and final pressure: . /ss/on Anchorage 13. ReDresentative Dailv Averaae Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl CasinQ Pressure Tubina Pressure Prior to well operation: 0 0 0 520 0 Subsequent to operation: 436 . 79 . 845 350 368 14. Attachments: o Copies of Logs and Surveys run 15. Well Class after proposed work: o Daily Report of Well Operations o Exploratory 181 Development o Service 16. Well Status after proposed work: o Well Schematic Diagram 181 Oil . o Gas o WAG OGINJ OWINJ o WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact David Reem, 564-5743 Printed Name Sondra Stewman Title Technical Assistant )~ --~ ,", . Prepared By Name/Number: . . ,'-- ; DateCß ~C: \ --OVSondra Stewman, 564-4750 Signature, ..;~l?c·,- //<lc\. y;: Phone 564-4750 Form 10-404 Revised 04/2006 RBDMS BFl AUG 0 9 2006 ORIGINAl ~ Submit ~ 0i~Y8"~ . ~ :At çÍrltb' 1. Operations Performed: o Abandon . STATE OF ALASKA _ RECEIVED ALA OIL AND GAS CONSERVATION COM"'ION REPORT OF SUNDRY WELL OPERATIONS JUL 1 9 2006 181 Repair Well 181 Pull Tubing o Operation Shutdown as a o Re-~~.nded Well 181 Other Change-Out ESP o Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P,O. Box 196612, Anchorage, Alaska 7, KB Elevation (ft): o Plug Perforations 0 Stimulate o Perforate New Pool 0 Waiver o Perforate 0 Time Extension 4. Well Class Before Work: 5. Permit To Drill Number: 181 Development 0 Exploratory 195-025 o Stratigraphic 0 Service 6. API Number: 50-029-22548- Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth . 8. Property Designation: ADL 355018 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Length Casing Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 73' 6585' 99519-6612 46.43 9. Well Name and Number: 10. Field 1 Pool(s): Milne Point Unit 1 Kupar. 12915' 7563 12810 7486 feet feet Plugs (measured) feet Junk (measured) feet Size MD Burst Collapse 20" 9-5/8" 5750 3090 7" 7552' 7240 5410 12865' 12498' - 12594' 7257' - 7327' 2-7/8",6.5# L-80 12406' 12. Stimulation or cement squeeze summa~' Intervals treated (measured): Treatment description including v mes used and final pressure: Re resentative Dail Avera e Production or In"ection Data Gas-Met Water-Bbl Casin Pressure o 0 1000 431 230 400 15. Well Class after proposed work: . o Exploratory 181 Development 0 Service 16. Well Status after proposed work: Well Schematic Diagram 181 Oil· 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL ify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: David Reem, 564-5743 Oil-Bbl Prior to well operatio . 0 Subsequent to oper tion: 113 14. Attachments: 0 C ies of Logs and Surveys run 181 aily Report of Well Operations 13. 17. Tubin Pressure o 395 Title Technical Assistant Prepared By Name/Number: Phone 564-4750 Date Ol-Il-OCpSondra Stewman, 564-4750 , G \ N, A L SJ~mit-?r~~~ ~n;Y RBDMS BFl AUG 091006 "... UI 20", 91.1 ppg, NT80LHE Tree: 2-9/16" - 5M Wellhead: 11" 5M FMC wI 3.5" FMC Tubing Hanger, EUE lift threads, 3" CIW H BPV profile KOP @ 700' MD Max. Hole Angle = 65 to 67 deg. fl 5800' - 10,850' Hole angle through perfs = 42 deg. 95/8",40 ppf, L-80 Btrs, I 6621' I 2 7/8" 6.5 ppf, 8rd, EUE, L-80 tbg. (cap. = 0.0058 bpf Stimulation Summary 120 M Lbs. 16-20 CL ISP 4/22/95 Kup "A" Sand - did not Screen out Perioration Summary REF LOG: 4/15/95 AWS GR/CCL Gun SP Interval 33/8" 6 12,498'-12,540' 12,550'-12,594' (7294'-7326') Jumbo Jet charges EHD = 0.76", TIP = 6.4" mid-perf = 7289' tvd 12546' md. DATE REV. BY COMMENTS 10108/95 JBF Pre-RWO Handover 11/10/95 JBF ESP Completion by Nabors 4 ES 11/13/96 MDO 07101/00 ESP RWO Nabors 4 ES 06125/06 KDC ESP Completion 4ES Orig. lev. = 45.5' (N 27E) Orig. GL elev. = 13.0' Orig. KB elev. = 47.0' (N 27E) DF to 7" hng. = 35.48' (N 27E) Camco 27/8" x 1" KBMM GLM 137' Camco 27/8" x 1" KBMM GLM 12,171'1 2-7/8" 2.313" XN NIPPLE 2.205" NO-GO 12,321'1 CentriliftGPMTAR 1:1 27GC2200 112,333' I GPMTAR 1:227GC2200 . . Gas Seperator GRSFTX AR H6 12,359; 1 I I I I Centrilift Tandem seal section Centrilift KMH 562 series, 266 hp. motor. 2345v. / 69 am, MOTOR RE-RATEDTO: 12,378' KME-1/225hp, 2190v / 59 amp. Centrilift Pumpmate Sensor 12,364' 12,400' Centralizer 12,404' 7454' tvd. Slicklinetage @ 12,730' 11/12/96 Orig. PBTD 7" 26ppf, NT-80S NSCC 112.815' 112,900' MILNE POINT UNIT WELL F-37 API NO: 50-029-22548 BP EXPLORATION AK · , Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-37 MPF-37 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 6/22/2006 Rig Release: 6/25/2006 Rig Number: Spud Date: 6/26/2000 End: 6/25/2006 6/22/2006 11 :00 - 13:00 2.00 RIGD P PRE PJSM. Scope down & layover derrick. Rig down rig components 13:00 - 14:00 1.00 MOB P PRE PJSM. Move rig & rig components form MPF-22 to MPF-37 14:00 - 16:00 2.00 RIGU P PRE PJSM. Rig up on MPF-37. Raise & scope up derrick. Rig accepted @ 16:00 hrs, 06/22/2006. 16:00 - 16:30 0.50 WHSUR P DECOMP P/U lubricator & pull BPV. UD lubricator & BPV. 16:30 - 17:30 1.00 RIGU P DECOMP R/U lines to tiger tank & tree. Install 2nd annular valve. Take on 120 degree seawater. 17:30 - 18:00 0.50 KILL P DECOMP Pressure test lines 1000/3500 psi. Check all connections to tiger tank. 18:00 - 18:30 0.50 KILL P DECOMP Hold PJSM & Pre-spud meeting wI all hands. Review kill operation & assignments. 18:30 - 22:30 4.00 KILL P DECOMP Open well. SITP = 620 psi. SICP = 670 psi. Bleed off pressure to 10 psi. Kill well. Pump 4.5 BPM 1440 psi. Caught pressure @ 280 stks. Est. Fluid level @ 2850', Con't to circulate well. Bullheade 20 bbls, 3 BPM @ 870 psi. Pumped total of 640 bbls. Had clean hot seawater returns. Recovered 275 bbls of fluid in tiger tank est. 70% oil. SID TP 0 psi. Annular press. 0 psi. Monitor well. Tubing on vacuum. 22:30 - 22:30 24.00 WHSUR P DECOMP Install TWC. 22:30 - 23:30 1.00 WHSUR P DECOMP Bleed off hanger void & N/D X-mas tree. Remove from cellar. 23:30 - 00:00 0.50 BOPSU P DECOMP N/U BOPE. 6/23/2006 00:00 - 03:00 3.00 BOPSU P DECOMP N/U BOPE. 03:00 - 08:00 5.00 BOPSU P DECOMP Pressure test BOPE as per BP/AOGCC requirements. LP 250 psi, HP 3500 psi. Chuck Sheve wI AOGCC waived witnessing test. 08:00 - 18:00 10.00 PULL N WAIT DECOMP Wait on spooling unit from Kuparuk. 3S using other spooling unit. 18:00 - 18:30 0.50 PULL P DECOMP Spot spooling unit. R/U power to spooling unit. 18:30 - 20:30 2.00 PULL P DECOMP M/U landing jt. BOLDS. Pull hanger to floor. P/U Wt = 95K. Cut cable. UD landing jt & hanger. Thread ESP cable in to reel in spooling unit. Dump 25 bbls of seawater down annulus. 20:30 - 00:00 3.50 PULL P DECOMP POOH & stand back 2 7/8" tubing. Use double displacement method to fill hole. 6/24/2006 00:00 - 01 :30 1.50 PULL P DECOMP Con't to POOH & stand back 2 7/8" tubing. Pulled 75 stands. 01 :30 - 02:30 1.00 PULL P DECOMP Cut cable & change out reels in spooling unit. Attach cable to new reel. 02:30 - 06:00 3.50 PULL P DECOMP Con't to POOH & stand back 2 7/8" tubing. Use double displacement to fill hole. 06:00 - 06:30 0.50 PULL P DECOMP Service rig. 06:30 - 09:30 3.00 PULL P DECOMP PJSM. UD ESP pump assembly & inspect same. No noticeable damage, shaft may be twisted. 09:30 - 12:30 3.00 PULL P DECOMP PJSM. Meg pump assembly & load in boxes. CIO spools. Remove elephant trunk & drain hose & rig up floor to run in hole wI ESP completion. 12:30 - 15:00 2.50 RUNCO RUNCMP PJSM. Pick up ESP pump assembly & attach cable & test same, OK. 15:00 - 21 :00 6.00 RUNCO RUNCMP PJSM. RIH wI ESP completion on 2 7/8" EUE 8 rnd tubing, megging cable & clearing tubing & pump by pumping seawater down tubing every 2000'.1 BPM @ 860 psi. RIH wI 79 stands. 21 :00 - 00:00 3.00 RUNCO P RUNCMP Change out reels in spooling unit. Make reel to reel splice & check same. Printed: 6/26/2006 7:13:46 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-37 MPF-37 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 6/22/2006 Rig Release: 6/25/2006 Rig Number: Spud Date: 6/26/2000 End: 6/25/2006 07:00 - 08:30 1.50 Finish making reel to reel splice. Con't to RIH wI stands of 2 7/8" tubing. Megged cable & pump thru tubing every 2000'. 1 BPM @ 870 psi. Tested good. 105 stands of 2 7/8" tubing in hole. RUNCMP Change out reels & Make reel to reel splice. Test same, OK. Service rig & complete pre tour derrick inspection. RUNCMP Continue in hole wI 2 7/8" EUE 8 rnd tbg & ESP cable. 92K final up wt, 90K down wt. RUNCMP PJSM. Pick up landing jt & M/U tubing hanger. Cut I splice ESP cable. Make field connection & test, OK. RUNCMP PJSM. Land tbg hanger & RILDs. UD landing joint, install 2 way check valve & test to 1500 psi, OK. RUNCMP PJSM. N/D 135/8" BOP stack. RUNCMP PJSM. N/U FMC 2 9/16" x 5M tree & test same to 5000 psi, OK. ,/ RUNCMP PJSM. Perform final check on ESP cable, OK. Pull 2 way check & set BPV. Secure well. Rig released @ 18:00 hrs, 06/25/2006. 03:00 - 07:00 4.00 08:30 - 12:00 3.50 12:00 - 13:00 1.00 13:00 - 14:30 14:30 - 16:00 16:00 - 18:00 2.00 WHSUR P Printed: 6/26/2006 7:13:46 AM STATE OF ALASKA ALASK/ L AND GAS CONSERVATION COMr SION RF_.~ORT OF SUNDRY WELL OPERATION~ 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. ~ Development KBE = 46.43 [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Milne Point Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 1930' NSL, 2643' WEL, SEC. 06, T13N, R10E, UM MPF-37 At top of productive interval 9. Permit Number / Approval No. 195-025 4794' NSL, 1441' WEL, SEC. 36, T14N, R09E, UM 10. APl Number At effective depth 50-029-22548-00 4964' NSL, 1573' WEL, SEC. 36, T14N, R09E, UM 11. Field and Pool At total depth Milne Point Unit / Kuparuk River 5019' NSL, 1617' WEL, SEC. 36, T14N, R09E, UM Sands 12. Present well condition summary Total depth: measured 12915 feet Plugs (measured) true vertical 7563 feet ORIGINAL Effective depth: measured 12810 feet Junk (measured) true vertical 7486 feet Casing Length Size Cemented MD TVD Structural Conductor 73' 20" 250 sx Arcticset I (Approx.) 110' 110' Surface 6585' 9-5/8" 1322 sx PF 'E', 250 sx Class 'G' 6621' 4521' Intermediate & 250 sx PF 'E' Production 12865' 7" 202 sx Class 'G' 12900' 7552' Liner · Perforation depth: measured 12498' - 12540', 12550' - 12594' true vertical 7257' - 7287', 7295' - 7327' . .... ., , :..--, ,-..-. -~ .~?.i i;.! ,' .. f '..~,:'.' Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80 to 12380' : :"-' ' ..., : :: ",. : · Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Daily Report of Well Operations [] Oil [] Gas [] Suspended Service 17. I hereby certify that the for, egoing is ijrue and correct to the best of my knowledge Signed Terrie Hubb,e,/~~_,"';'~" ~_ Title Technical Assistant Date 0 ~)",~'-(~' ~ Prepared By Name/Number: Terrie Hubble, 564-4628 Submit In Duplicat~ Form 10-404 Rev. 06/15/88 i0nS summary Report Legal Well Name: Milne Point MP F-37 Common Well Name: MPF-37 Spud Date: 6/26/2000 Event Name: WORKOVER Start: 6/26/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: Date i: iFr°~ ~To" H°~rs!Activity.C°de' Phase ~ :~ Description of Operations 6/26/2000 18:00 - 21:00 3.00 RIGU DECOMP RU HCR Valve and hard lines, test to 3000 psi 21:00 -21:30 0.50 KILL DECOMP RU lubricator, pull BPV 21:30 - 22:00 0.50 KILL DECOMP SITP-1000 psi, Annulus-1300 psi. Vent gas 22:00 - 00:00 2.00i KILL DECOMP Pump 9.0 ppg brine, led by lubricant pill, to kill well 6/27/2000 00:00 - 01:30 1.50 KILL COMP Pump 9.0 ppg brine to kill well 01:30 - 04:30 3.00 KILL COMP monitor well, bleed pressure. SITP-60 psi, Annulus-100 psi. Pressures slowly building. Increase brine weight to 9.2 ppg 04:30 - 11:30 7.00! KILL COMP Circulate 9.2 ppg brine 11:30 - 12:00 0.50 WHSUR COMP set & test TWC.2000 Psi. 12:00 - 13:00 1.00 WHSUR COMP Rig Dn HCR Valve & Nipple down Tree. 13:00 - 15:00 I 2.00 BOPSUF COMP Nipple Up BOP's 15:00 - 18:00 3.00 BOPSUF COMP Test BOP's To 250-Low & 3500 Psi. high. 18:00 - 19:30 1.50 WHSUR COMP Rig Lubricator & Pull TWC. 19:30 20:30 I 1.00 WHSUR COMP Make up Landing Jt. & Pull Hanger To Floor. 20:30 - 23:59 3.48 PULL COMP Pooh with ESP (Total of 42 Stands out at midnight. 6/28/2000 00:00 - 01:30 1.50 PULL COMP i Change spooler in asp spooling unit. 01:30 - 07:00 5.50 PULL COMP !finish toh with asp completion. 07:00 - 08:30 1.50 PULL COMP lay dn asp assy. & clean floor. 08:30 - 11:00 2.50 RIGU COMP Make esp assy. & service same. 11:00 - 16:30 5.50 RUNCO~ COMP Rih with esp asy to 4300' and well bore became infulexed with gas and oil. 16:30 - 19:00 2.50 KILL COMP circ. at l-bpm 2200 psi. & clean influx from top at 4300 & raise wt. to 9.9 ppg. 19:00 - 22:00 3.00 RUNCO~4 COMP rih to 8366' 22:00 - 23:59 1.98 RUNCO~4 COMP install esp cable & make splice. 6/29/2000 00:00 - 01:00 1.00 RUNCO~4 COMP continue to make splice in esp cable @ 8366' 01:00 - 04:00 3.00 RUNCO~4 COMP Continue to run in hole with esp assy to setting depth @ 12380' 04:00 - 04:30 0.50 RUNCO~4 COMP Make up hanger. & landing joint. 04:30 - 06:00 1.50 RUNCO~4 COMP Make connector to esp cable & hook to hanger & test. 06:00 - 06:30 0.50 RUNCOI~4 COMP land tbg. hanger. 06:30 - 09:30 3.00 BOPSUF COMP set twc& nipple down bop 09:30 - 11:00 1.50 WHSUR COMP NU & test tree to 5000 psi. 11:00 - 12:00 1.00 WHSUR COMP Pull twc set bpv & secure tree & cellar & Release rig. · · Printed: 7/20/2000 10:34:31 AM ~ALASKA4) eare. d Fy'Ices tilling BP Exploration / Arco To: Alaska Oil & Gas Conservation Commission Date: February 26, 1999 From: Subject: Terrie Hubble /~//,~ Technical Assistant Miscellaneous Surveys Enclosed, in duplicate, are a number of directional surveys that I have come across while clearing out Ms. Campoamor's desk. I have verified that these surveys do not affect the previously calculated TVD's and below surface locations of these wells, so it was not necessary to correct the 10-407's. They are simply being submitted for your records. If they are duplicates, please discard them. Thank you. /tlh Endicott MPI 1-09A/L-21 Milne Point MPC-09 Milne Point MPF-21 Milne Point MPF-37 Milne Point MPF-45 Milne Point MPF-69 Milne Point MPF-79 Permit #97-29 Permit #85-36 Permit #96-135 Permit ~' Permit #95-58 Permit ~95-125 Permit ¢97-180 gyro/data B.P. EXPLORATION WELL NO:MPF-37 MILNE POINT, NORTH SLOPE, ALASKA Gyro Multishot Survey Inside 5" Drillpipe Survey date :07 APRIL, 1995 Job number :AK0495G259 SR348.DOC Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 April 23, 1995 B.P. Exploraton (Alaska) Inc. Petrotechnical Data Center, MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 Re: F-Pad, Well No: MPF-37, Milne Point, AK Enclosed please find one (1) original and six (6) copies and one (1) disk of the completed survey of Well # MPF-37 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely Robert J. Shoup Operations Manager RS/fec Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER ;AK0495G259 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR348. DOC gyro/data 1. DISCUSSION, SURVEY CERTIFICATION SHEET SR348. DOC gyro/data DISCUSSION JOB NUMBER: AK0495G259 Tool 713 was run in welI#MPF-37 on ATLAS 15/32" Wireline inside drillpipe, survey was run without problems. SR348.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER; AK0495G259 The data for this sUrvey and the calculations for this survey were obtained and performed by me according to standards and procedureS as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyr°data Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR348.DOC gyro/data 2. SURVEY DETAILS SR348.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0495G259 CLIENT: B.P. EXPLORATION RIG: ATLAS LOCATION: MILNE POINT FIELD, ALASKA WELL: MPF-37 LATITUDE: 70.515 N LONGITUDE: 149.5 W SURVEY DATE: O7 APRIL, 1995 SURVEY TYPE : MULTISHOT IN 5 IN. DRILLPIPE DEPTH REFERENCE: MAX. SURVEY DEPTH' ROTARY TABLE ELEVATION 45.9FT. 7707 FT. SURVEY TIED ONTO: NA SURVEYINTERVAL: 100' FROM 0-6900' 30' FROM 6900' - 7707' UTM CO-ORDINATES: TARGET DIRECTION: 335.0 GRID CORRECTION: CALCULATION METHOD: N/A MINIMUM CURVATURE SURVEYOR: TOM STODDARD SR348. DOC 3. OUTRUN SURVEY LISTING SR348.DOC A Gyr~odat a D i re c t iona i Survey for B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA ~c~ Number: AK0495G259 Run Date: 7-Apr-96 20:21:42 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.515000 deg. N Sub-sea Correction from Vertical Reference: 45.9 ft. Azimuth Correction: Gyro: Bearings are Relative to True North P.~posed Well Direction: 335.000 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i ona I Survey B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA Job Number: AK0495G259 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 0.0 0.00 0.00 0.0 0.0 -45.9 0..00 0.0 0.0 ' - 7707 ft.) A GYRO MULTISHOT SURVEYIN 5" DRILLPIPE A~ MEASURED DEPTHS REFERENCED TO NABORS 27E RKB ELEV. 45.9 FT. Page HORIZONTAL COORDINATES feet 1 0.00 N 0.00 E 100.0 .45 338.29 100.0 .4 54.1 200.0 .31 307.62 200.0 1.0 154.1 300.0 .37 349.91 300.0 1.6 254.1 400.0 .57 330.30 400.0 2.4 354.1 500.0 .58 298.30 500.0 3.3 454.1 600.0 .49 304.39 600.0 4.0 554.1 700.0 1.18 306.95 700.0 5.3 654.1 800.0 1.47 304.77 799.9 7.4 754.0 900.0 2.49 330.71 899.9 10.6 854.0 1000.0 4.68 344.91 999.7 16.8 953.8 41.00.0 5.06 345.69 1099.3 25.2 1053.4 .__~00.0 5.63 347.77 1198.9 34.3 1153.0 1300.0 6.78 346.11 1298.3 44.9 1252.4 1400.0 9.09 343.41 1397.3 58.5 1351.4 1500.0 10.99 336.06 1495.8 75.8 1449.9 1600.0 11.57 332.10 1593.9 95.4 1548.0 1700.0 13.19 333.45 1691.5 116.8 1645.6 1800.0 14.74 334.02 1788.6 140.9 1742.7 1900.0 15.99 335.13 1885.0 167.4 1839.1 2000.0 18.17 333.39 1980.6 196.8 1934.7 1. 2. 2. 1. 1. 1. 2. 45 24 25 25 32 10 69 30 33 35 38 60 16 35 29 97 64 55 29 24 .4 1.0 1.6 2.4 3.3 4.2 5.6 7.9 11.2 17.1 25.2 34.3 45.0 58.7 76.1 95.6 116.9 141.0 167.5 196.8 338 . 330. 330. 333 · 327. 3 .36 N .14 W 5 .89 N .50 W 6 1.37 N .77 W 1 2.12 N 1.08 W 7 2.79 N 1.76 W 331.5 22.18 N 12.02 W 335.6 31.25 N 14.15 W 338.3 41.77 N 16.61 W 339.8 55.07 N 20.28 W 339.7 71.36 N 26.41 W 338.5 88.95 N 34.97 W 337.5 108.02 N 44.77 W 336.8 129.66 N 55.44 W 336.5 153.59 N 66.81 W 336.2 180.03 N 79.59 W 321.9 3.27 N 2.56 W 317.9 4.14 N 3.74 W 314.3 5.49 N 5.62 W 316.4 8.12 N 7.74 W 324.7 13.96 N 9.87 W A Gyrodat a D i re c t iona i Survey B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA Job Number: AK0495G259 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet 2100.0 2200.0 '00.0 --Z~00.0 2500.0 2600.0 2700.0 2800.0 2900.0 3000.0 3100.0 3200.0 3300.0 3400.0 3500.0 ~600.0 00.0 3800.0 3900.0 4000.0 4100.0 4200.0 4300.0 4400.0 4500.0 22.66 333.42 2074.3 26.45 333.23 2165.2 29.34 334.30 2253.6 31.98 335.28 2339.6 34.13 335.78 2423.4 36.61 334.24 2505.0 39.38 334.33 2583.7 41.46 333.67 2659.9 42.07 334.21 2734.5 44.12 334.51 2807.5 231.7 27322 320.0 371.0 425.5 483.4 544.9 609.8 676.4 744.7 SUBSEA DEPTH feet 2028.4 2119.3 2207.7 2293.7 2377.5 2459.1 2537.8 2614.0 2688.6 2761.6 45.36 333.46 2878.5 815.~0 2832.6 48.00 335.50 2947.1 887.8 2901.2 50.64 336.21 3012.3 963.6 2966.4 53.45 335.64 3073.8 1042.4 3027.9 55.29 336.16 3132.0 1123.7 3086.1 56.21 336.88 3188.3 1206.3 3142.4 56.85 336.91 3243.5 1289.7 3197.6 58.88 335.78 3296.7 1374.3 3250.8 61.37 335.66 3346.5 1461.0 3300.6 61.12 334.54 3394.6 1548.7 3348.7 63.08 335.53 3441.4 1637.1 3395.5 63.42 335.95 3486.4 1726.4 3440.5 63.32 336.01 3531.2 1815.7 3485.3 63.52 335.45 3576.0 1905.2 3530.1 63.18 334.54 3620.8 1994.5 3574.9 DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. 4.49 231.7 335.7 3.79 273.2 335.4 2.93 320.0 335.1 2.69 371.0 335.1 2.17 425.5 335.2 2.63 483.4 335.1 2.77 544.9 335.0 2.12 609.8 334.9 .71 676.4 334.8 2.06 744.7 334.8 1.44 815.1 334.7 3.03 887.8 334.7 2.69 963.6 334.8 2.84 1042.4 334.9 1.89 1123.7 334.9 1.10 1206.3 335.1 .64 1289.7 335.2 2.25 1374.4 335.2 2.49 1461.1 335.3 1.01 1548.7 335.3 2.14 1637.1 335.3 .51 1726.4 335.3 .11 1815.8 335.3 .54 1905.2 335.3 · 88 1994.6 335.3 Page 2 HORIZONTAL C O.O R D I N A T E S feet 211.22 N 95.20 W 248.35 N 113.86 W 290.32 N 134.52 W 336.46 N 156.22 W 386.11 N 178.81 W 438.56 N 203.28 W 494.02 N 229.99 W 552.29 N 258.42 W 612.13 N 287.68 W 673.72 N 317.24 W 736.97 N 802.62 N 871.82 N 943.80 N 1017.99 N 1093.81 N 1170.53 N 1248.08 N 1327.12 N 1406.64 N 1486.75 N 1568.17 N 1649.82 N 1731.34 N 1812.34 N 348.12 W 379.44 W 410.45 W 442.61 W 475.79 W 508.72 W 541.46 W 575.44 W 611.09 W 648.00 W 685.29 W 721.98 W 758.36 W 795.12 W 832.90 W A Gyrodat a Di re c t iona i Survey B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA Job Number: AK0495G259 Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. .AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4600.0 4700.0 ~00.0 ~°~900.0 5000.0 5100.0 5200.0 5300.0 5400.0 5500.0 5600.0 5700.0 5800.0 5900.0 6000.0 64.70 335.10 3664.7 64.22 336.29 3707.9 64.27 335.95 3751.3 64.18 335.90 3794.8 64.18 336.07 3838.3 63.71 336.35 3882.3 64.33 337.87 3926.1 64.34 338.83 3969.4 64.51 336.98 4012.5 64.38 335.80 4055.7 63.63 337.00 4099.5 63.20 336.20 4144.3 65.26 335.81 4187.7 64.71 334.85 4230.0 65.71 335.89 4272.0 2084.4 2174.6 2264.6 2354.7 2444.7 2534 2624 2714 2804 2894 2984 3073 3163 3254 3345 .5 .3 .3 .4 .6 .4 .8 .9 .5 .3 3618.8 3662.0 3705.4 3748.9 3792.4 3836.4 3880.2 3923.5 3966.6 4009.8 4053.6 4098.4 4141.8 4184.1 4226.1 1·60 2084.4 335.3 1·18 2174.6 335.3 .32 2264.7 335.3 .10 2354.7 335.4 .15 2444.7 335.4 .53 2534.6 335.4 1.50 2624.4 335.5 .87 2714.4 335.6 1.68 2804.6 335.6 1.07 2894.8 335.7 1.31 2984.7 335.7 .84 3074.1 335.7 2.09 3164.1 335.7 1.03 3254.7 335.7 1.38 3345.5 335.7 1893.64 N 1975.87 N 2058.23 N 2140.45 N 2222.67 N 2304.88 N 2387.69 N 2471.47 N 2555.04 N 2637.71 N 2720.07 N 2802.14 N 2884.41 N 2966.75 N 3049.27 N 871.11 W 908.24 W 944.70 W 981.44 W 1018.07 W 1054.31 W 1089.28 W 1122.53 W 1156.46 W 1192.59 W 1228.57 W 1264.09 W 1300.71 W 1338.54 W 1376.37 W =100 ~00 6300 6400 6500 .0 .0 .0 .0 .0 66.20 336.04 4312.7 66.42 335.53 4352.9 66.61 335·48 4392.7 66.86 334.87 4432.2 66.08 335.09 4472.2 3436 3528 3619 3711 3803 .6 .1 .8 .7 .4 4266.8 4307.0 4346.8 4386.3 4426.3 .51 3436.8 335.7 .52 3528..4 335.7 .19 3620:1 335.7 .61 3712.0 335.7 .80 3803.7 335.7 3132.68 N 3216.19 N 3299.66 N 3383.04 N 3466.12 N- 1413.56 W 1451.12 W 1489.14 W 1527.71 W 1566.49 W 6600.0 6700.0 6800.0 6900.0 6990.0 66.07 336.16 4512.7 66.60 335.43 4552.9 67.15 335.55 4592.1 67.42 335.86 4630.7 67.47 334.93 4665.3 3894 3986 4078 4170 4253 · 8 .4 .3 .6 .7 4466.8 4507.0 4546.2 4584.8 4619.4 .98 3895.1 335.7 .86 3986.7 335.7 .56 4078.6 335.7 .39 4170.9 335.7 .95 4254.0 335.7 3549.37 N 3632.91 N 3716.59 N 3800.66 N 3876.23 N 1604.21 W 1641.77 W 1679.92 W 1717.88 W 1752.48 W A Gyroda t a Di r e c t i ona i Survey B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA Job Number: AK0495G259 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet 7020 7050 180 ~110 7140 7170 7200 7230 7260 7290 7320 7350 7380 7410 7440 7470 ~300 7530 7560 7590 7620 7650 7680 7707 Final .0 67.56 334.99 4676.7 .0 67.73 335.50 4688.1 .0 67.86 335.51 4699.5 .0 67.86 334.75 4710.8 .0 67.92 334.92 4722.1 .0 67.68 334.01 4733.4 .0 67.50 334.45 4744.9 .0 66.59 333.50 4756.6 .0 65.52 334.45 4768.7 .0 65.51 333.72 4781.2 .0 65.38 334.06 4793.6 .0 65.21 333.68 4806.2 .0 ~65.25 333.26 4818.7 .0 65.33 333.64 4831.3 .0 65.57 333.30 4843.7 .0 65.51 333.13 4856.2 .0 65.46 333.76 4868.6 .0 65.37 334.58 4881.1 .0 65.40 335.14 4893.6 .0 65.36 335.27 4906.1 .0 65.52 334.35 4918.6 .0 65.55 334.49 4931.0 .0 65.55 334.59 4943.4 .0 65.66 334.23 4954.6 4281.4 4309.2 4336.9 4364.7 4392.5 4420.3 4448.0 4475.6 4503.0 4530.3 4557.6 4584.9 4612.1 4639.3 4666.6 4693.9 4721.2 4748.5 4775.8 4803.0 4830.3 4857.6 4884.9 4909.5 Station Closure: Distance: 4909.70 SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 4630.8 .35 4281.7 335.7 4642.2 1.65 4309.4 335.7 4653.6 .46 4337.2 335.7 4664.9 2.35 4365.0 335.7 4676.2 .57 4392.8 335.7 4687.5 2.91 4420.6 335.6 4699.0 1.46 4448.3 335.6 4710.7 4.20 4475.9 335.6 4722.8 4.61 4503.3 335.6 4735.3 2.22 4530.6 335.6 4747.7 1.13 4557.9 335.6 4760.3 1.29 4585.1 335.6 4772.8 1.28 4612.3 335.6 4785.4 1.19 4639.6 335.6 4797.8 1.31 4666.'8 335.6 4810.3 .56 4694.1 335.5 4822.7 1.93 4721.4 335.5 4835.2 2.49 4748.7 335.5 4847.7 1.72 4775.9 335.5 4860.2 .42 4803.2 335.5 4872.7 2.85 4830.5 335.5 4885.1 .45 4857.8 335.5 4897.5 .29 4885.1 335.5 4908.7 1.27 4909.7 335.5 ft Az: 335.49 deg. Page 4 HORIZONTAL C 0 0 R D I N.A T E S feet 3901.34 N 3926.54 N 3951.82 N 3977.03 N 4002.18 N 4027.24 N 4052.22 N 4077.04 N 4101.68 N 4126.24 N 4150.74 N 4175.21 N 4199.58 N 4223.96 N 4248.37 N 4272.75 N 4297.17 N 4321.72 N 4346.41 N 4371.17 N 4395.86 N 4420.49 N 4445.15 N 4467.33 N 1764.21 W 1775.83 W 1787.35 W 1799.04 W 1810.86 W 1822.83 W 1834.89 W 1847.01 W 1859.04 W 1870.97 W 1882.98 W 1894.98 W 1907.15 W 1919.33 W 1931.51 W 1943.82 W 1956.02 W 1967.91 W 1979.50 W 1990.93 W 2002.55 W 2014.34 W 2026.07 W 2036.69 W A Gyroda t a D i r e c t i ona i Survey for B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA d~o Number: AK0496G259SS Run Date: 7-Apr-96 20:21:42 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.515000 deg. N Sub-sea Correction from Vertical Reference: 45.9 ft. Azimuth Correction: Gyro: Bearings are Relative to True North L~posed Well Direction: 335.000 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA Job Number: AK0496G259SS SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG CLOSURE .SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. -45.9 0.00 0.00 0.0 0.0 0.00 0.0 0.0 HORIZONTAL C O O R D I N A T E S feet 0.00 N 0.00 E Page ' - 7707 ft.) A GYRO MULTISHOT SURVEYIN 5" DRILLpIPE A~ MEASURED DEPTHS REFERENCED TO NABORS 27E RKB ELEV. 45.9 FT. 100.0 .38 324.21 145.9 .7 .35 200.0 .34 327.03 245.9 1.3 .25 300.0 .46 340.91 345.9 1.9 .25 400.0 .57 315.61 445.9 2.8 .28 500.0 .54 301.10 545.9 3.6 .22 600.0 .81 305.57 645.9 4.6 .37 700.0 1.32 305.95 745.9 6.3 .51 800.0 1.94 316.69 845.9 8.9 .77 900.0 3.50 337.26 945.9 13.5 1.80 1000.0 4.86 345.27 1045.9 20.7 1.44 1.100.0 5.33 346.66 1145.9 29.4 .49 ,~_200.0 6.17 346.99 1245.9 39.3 .86 1300.0 7.89 344.81 1345.9 51.4 1.73 1400.0 10.03 339.79 1445.9 67.0 2.32 1500.0 11.29 334.04 1545.9 85.8 1.61 1600.0 12.44 332.82 1645.9 106.8 1.33 1700.0 14.06 333.77 1745.9 130.3 1.59 1800.0 15.48 334.68 1845.9 156.7 1.39 1900.0 17.38 334.02 1945.9 186.1 1.89 2000.0 21.30 333.41 2045.9 221.1 3.81 1.0 1.6 2.4 3.3 4.2 334.7 330.6 331.8 330.6 325.1 .60 N .31 W 1.11 N .63 W 1.72 N .91 W 2.43 N 1.39 W 3.01 N 2.13 W 5.6 320.1 3.67 N 3.10 W 7.9 316.2 4.76 N 4.61 W 11.2 315.3 6.70 N 6.60 W 17.1 320.2 10.81 N 8.72 W 25.2 327.9 17.77 N 10.87 W 34.3 333.5 26.42 N 13.02 W 45.0 336.9 36.23 N 15.31 W 58.7 339.0 48.16 N 18.37 W 76.1 339.7 63.11 N 23.30 W 95.6 339.1 80.35 N 30.78 W 338.0 99.11 N 40.19 W 337.1 120.14 N 50.75 W 336.6 143.89 N 62.20 W 336.3 170.44 N 74.95 W 335.9 201.77 N 90.47 W 116.9 141.0' 167.5 196.8 231.7 A Gyroda t a D i re c t iona i Survey B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA Job Number: AK0496G259SS Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet~ VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 2100 2200 :300 -----24oo 2500 .0 .0 .0 .0 .0 25.65 333.27 2145.9 29.09 334.20 2245.9 32.14 335.32 2345.9 34.82 335.36 2445.9 38.05 334.29 2545.9 264.4 315.9 375.1 441.5 515.4 3.94 273.2 335.4 3.01 320.0 335.2 2.65 425.5 335.1 2.29 483.4 335.1 2.71 544.9 335.1 240.46 N 109.89 W 286.67 N 132.72 W 340.19 N 157.92 W 400.58 N 185.56 W 467.38 N 217.16 W 2600 2700 2800 2900 3000 3100 3200 3300 3400 3500 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 41.08 333.79 2645.9 42.33 334.15 2745.9 44.61 333.63 2845.9 47.94 335.45 2945.9 52.15 335.90 3045.9 55.51 336.33 3145.9 56.92 336.87 3245.9 61.31 335.67 3345.9 63.11 335.57 3445.9 63.38 335.83 3545.9 597.9 687.3 782.9 885.4 ioo5.5 1142.8 1292.2 1458.7 1644.5 1843.6 2.24 609.8 334.9 .79 814.5 334.8 1.45 814.5 334.7 3.00 887.3 334.6 2.77 1041.9 334.8 1.70 1205.8 334.9 .70 1373.8 335.1 2.48 1460.5 335.2 2.00 1725.9 335.2 .24 1904.7 335.3 541.59 N 253.20 W 621.94 N 292.50 W 707.74 N 334.68 W 800.17 N 379.18 W 909.76 N 428.29 W 1035.17 N 484.13 W 1172.53 N 543.21 W 1324.60 N 610.85 W 1493.22 N 689.10 W 1674.86 N 770.55 W ~600 ~-~700 3800 3900 4000 .0 .0 .0 .0 .0 4100.0 4200.0 4300.0 4400.0 4500.0 64.03 334.86 3645.9 64.27 336.00 3745.9 64.11 336.12 3845.9 64.34 338.30 3945.9 64.41 336.08 4045.9 63.25 336.19 4145.9 65.07 335.23 4245.9 66.38 335.63 4345.9 66.60 334.94 4445.9 66.50 335.56 4545.9 2044.3 2251.9 2458.6 2664.0 2872.6 3075.7 3287.3 3510.6 3741.4 3968.9 1.28 2083.9 335.3 .43 2264.1 335.3 .21 2534.0 335.4 1.22 2713.9 335.5 1.22 2894.2 335.6 .87 3163.6 335.7 1.16 3345.0 335.7 .52 3527.9 335.7 .68 3803.1 335.7 .88 3986.1 335.7 1857.03 N 854.81 W 2046.21 N 940.27 W 2235.08 N 1024.42 W 2424.29 N 1104.65 W 2617.20 N 1184.51 W 2803.49 N 1265.58 W 2996.20 N 1352.93 W 3199.83 N 1444.65 W 3409.62 N 1541.03 W 3616.59 N 1635'.32 W A Gyroda t a D i re c t ional Survey B.P. EXPLORATION WELL: MPF-37, 5" DRILLPIPE Location: F-PAD, MILNE POINT,ALASKA Job Number: AK0496G259SS SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL C O O R D I N A T E~S feet 4600.0 67.44 335.46 4645.9 4700.0 67.46 334.40 4745.9 '800.0 65.56 333.28 4845.9 ~900.0 65.57 334.53 4945.9 4909.1 65.66 334.23 4955.0 4205.4 .63 4253.4 335.7 4448.8 1.59 4475.4 335.6 4669.8 1.21 4693.6 335.5 4888.8 .47 4909.2 335.5 4909.0 1.27 4909.2 335.5 3831.94 N 4052.58 N 4250.82 N 4448.32 N 4466.50 N 1733.10 W 1835.99 W 1933.69 W 2028.51 W 2037.22 W Final Station Closure: Distance: 4909.17 ft Az: 335.48 deg. Page gyro/data 4. QUALITY CONTROL SR348. DOC gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK0495G259 TOOL NUMBER: 713 MAXIMUM GYRO TEMPERATURE: 76.8 C MAXIMUM AMBIENT TEMPERATURE: 38.0 C MAXIMUM INCLINATION: 66.0 AVERAGE AZIMUTH: 335.48 WIRELINE REZERO VALUE: 10' REZERO ERROR / K: N/A CALIBRATION USED FOR FIELD SURVEY: CALIBRATION USED FOR FINAL SURVEY: 1106 1106 PRE JOB MASS BALANCE OFFSET CHECK: -.25 POST JOB MASS BALANCE OFFSET CHECK~: CONDITION OF SHOCK WATCHES -.70 USED -.63 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD FIELD SURVEY 7707 65.66 334.79 4954.55 FINAL SURVEY 7707 65.66 334.23 4954.6 NORTHING 4467.37 4467.33 EASTING 2036.60 2036.69 SR348. DOC gyro/data FUNCTION TEST JOB NUMBER: AK0495G259 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 3000 44.1 44.1 44.1 44.1 44.1 AZIMUTH M.D. ft 1 2 3 4 5 3000 334.4 334.5 334.6 334.4 334.5 SR348.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR348. DOC gyro/data EQUIPMENT REPORT JOB NI. JMBER: AK0495G259 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 713 GYRO SECTION A0119 DATA SECTION C0002 POWER SECTION C0001 COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0074 A0079 A0071 BACKUP TOOL No. 746 GYRO SECTION A0004 DATA SECTION C0025 POWER SECTION ', C0026 COMPUTER POWER SUPPLY PRINTER INTERFACE A0122 A0074 A0029 A0035 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 15/32" RUNNING GEAR 2.25" SYSTEM TOTAL LENGTH OF TOOL: 23.5 FEET MAXIMUM O.D.: 2.25 INCHES TOTAL WEIGHT OF TOOL: 210 POUNDS SR348.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK0495G259 04/06/95 05:00 05:45 06:30 10:15 10:45 11:15 12:00 13:15 14:45 17:30 18:50 TRANS.TO LOCATION ARRIVE AT LOCATION MU TOOL TOOL WORKING, STANDBY PU TOOL, MU PUMPIN SUB RIH. 7620' 4600' 2900' BD. TOOL RD. ATLAS ARRIVE AT ATLAS. PROCESS SURVEY RTN. TO RIG W / SURVEY. 04/07/95 14:00 RETURN TO ANCHORAGE SR348.DOC STATE OF ALASKA ALAS1~71L AND GAS CONSERVATION /IMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: ^ Operation Shutdown ^ Stimulate ^ Plugging ^ Perforate ®Pull Tubing ^ Alter Casing ®Repair Well ®Other ESP Replacement 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KBE) BP Exploration (Alaska) Inc. ®Development KBE = 46' ^ Exploratory 3. Address ^ Stratigraphic 7. Unit or Property Name P.O. Box 196612, Anchorage, Alaska 99519-6612 ^ Service Milne Point Unit 4. Location of well at surface 8. Well Number 1930' NSL, 2643' WEL, Sec. 6, T13N, R10E, UM T~. ~©4a-~2~~v-~c.~> MPF-37 At top of productive interval ~~~~ ~ ~~ ~~. g, Permit Number / Approval No. 4794' NSL, 1475' WEL, Sec. 36, T14N, R9E, UM S~~ ,~ `~~~~~ At effective depth ~ 10. API Number 4964' NSL, 1450' WEL, Sec. 36, T14N, R9E, UM ~' ~ ~~'~-.-~~~.'~ 50- 029-22548 At total depth f~J~ -~i~ 11 ~Mi nle Po ntUnit / Kuparuk River 5019' NSL, 1651' WEL, Sec. 36, T14N, R9E, UM ~' ` ~~~ Sands 12. Present well condition summary Total depth: measured 12915' feet Plugs (measured) true vertical 7563' feet Effective depth: measured 12810' feet Junk (measured) true vertical 7486' feet Casing Length Size Cemented Structural Conductor Surface Intermediate Production Liner 73' 20" 250 sx Arcticset 1 (approx) 6585' 9 5/8" 1322 sx PF 'E; 250 sx 'G' 250 sx PF 'E' 12865' 7" 202 sx Class 'G' Perforation depth: measured 12498'-12540', 12550'-12594' true vertical 7252'-7284', 7294'-7326' Tubing (size, grade, and measured depth) 2 7/8" 6.5# L-80 to 12276' Packers and SSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14_ Representative Daily Average Production or Infection Data Prior to well operation: Oil-Bbl Gas-Mcf Water-Bbl Subsequent to operation: MD TVD 110' 110' 6621' 4507' 12900' 7528' t,PR 2 x::199$ ~la~4ca+~l & Gas~orrrs. Cct~~~~'~~: i Casing Pressure Tubing Pressure 15. Attachments 16. Status of well classifications as: ^ Copies of Logs and Surreys run ®Oil ^ Gas ^ Suspended Service ®Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Chip Alvord Title Engineering Supervisor Date .3jL3(9~j Prepared By Name/Number. Mary Youngers 564-5242 Form 10-404 Rev. 06/15/88 Submit In Duplicates. S~MARY OF DAILY OPERATIGNS Well Name: Accept Date: SHARED SERVICES DRILLING - BPX / ARCO M PF-37 11 /09/96 Rig Name: Spud Date: N-4ES AFE# Release Date: 339030 11 /12/96 NOVEMBER 10, 1996 RIG ACCEPTED C 1400 HRS 11/09/96. RIG UP LINES TO TREE & TIGER TANK. RIG UP LUBRICATOR, PULL BPV. TAKE ON 8.4 PPG SOURCE WATER. MONITOR WELL SITP 580 PSI SICP 580 PSI KILL WELL W/8.4 PPG SOURCE WATER PUMP DOWN TUBING TAKING REUTRNS OUT ANNULUS THRU CHOKE PUMP TUBING VOLUME, TUBING ON VACUMN MIX 40 BBLS XANVIS PILL W/10 PPG LIQUID CASING LCM, PUMP & BULLHEAD INTO PERF CIRCULATE OUT BACKSIDE ON CHOKE, OIL & GAS RETURNS RETURNS APPROX. 25% MIX 2ND LCM PILL OF XANVIS W/15 PPG LIQUID CASING PUMP PILL & BULLHEAD INTO FORMATION. CIRCULATE OUT BACKSIDE UNTIL CLEAN 8.4 PPG SOURCE WATER RETURNED SHUT DOWN MONITOR WELL FLUID LOSS 52 BBLS/HR. MIX & PUMP 3RD PPG XANVIS W/5 PPB XANVIS W/5 PPB LIQUID CASING SPOT LCM DID NOT BULLHEAD INTO PERFS MONITOR WELL, WELL DEAD. SET TWC CHECK VALVE, ND 3 1/8" 5000# WKM TREE & 13 5/8" 5000# FMC ADAPTER SPOOL. TUBING HANGER LANDING THREAD 3 ~/2" NSCT. NOVEMBER 11, 1996 NU 13 5/8" 5000# HYDRILL BOP STACK. TEST BOP; TEST ALL RAMS, LINES & VALVES TO 250 & 5000 PSI. TEST HYDRILL 250 & 3000 PSI. TEST KELLY, UPPER & LOWER KELLY VALVES TIW & IBOP TO 250 & 5000 PSI. WITNESS TEST WAIVED BY MR. FOSTER OF AOGCC. PULL TWC MU LANDING JT. W/3 1/2" NSCT PIN -ATTEMPT PULL TUBING HANGER TO RIG FLOOR, HANGER WOULD NOT PASS THROUGH ANNULAR PREVENTOR CAP WORK HANGER TO 150k - 60k OVER STRING WT. CAN NOT PULL 13'/2" OD HANGER THROUGH HYDRILL LAND TUBING INSTALL BPV RUN IN LOCK SCREWS, ND BELL NIPPLE REMOVE CAP ON HYDRILL FOUND WEAR PLATE UNDER CAP NOT INSTALLED PROPERLY WEAR PLATE OFF CENTER CAUSING BORE THROUGH HYDRILL TC3 BE LESS THAN 13 5/8" ANNULAR PREVENTOR WORKED ON BY HYDRILL THIS PAST SUMMER. GRIND WEAR PLATE OUT TO 13 5/8" MINIMUM BORE & RE-INSTALL UNDER CAP, NU BELL NIPPLE RIG DOWN TIME. PULL BPV, MU LANDING JT. PULL TUBING HANGER TO RIG FLOOR MONITOR WELL 52 BBL TO FILL HOLE FLUID LOSS 20 BBLS/HR WHILE KEEPING HOLE FULL. POOH W/ESP STANDING BACK TUBING 124 STANDS OUT OF HOLE @ 0600 HRS (11500'). NOVEMBER 12, 1996 FINISH POOH W/ESP PULL 384 JTS 2 7/8" 6.5# L-80 EUE TUBING TUBING IN GOOD CONDITION, RECOVERED 42 FLAT BANDS, 194 LA SALLES CLAMPS (NONE MISSING) ESP MOTOR BURNT, POT HEAD GAS BLOWN. RIG UP OTIS SLICKLINE MU & SERVICE ESP. RIH W/ESP N 2 7/8" TUBING FROM DERRICK. INSTALL LA SALLE CAMP EVERY OTHER JT. CHANGE OUT CABLE SPOOL MAKE Page 1 of 2 SUMMARY OF DAILY OPERATIGNS CABLE SPLICE, SLIP 42' DRILL LINE. CONTINUE RIH W/ESP MU FMC 13 ~h x 3 1/2" TUBING HANGER. RAN TOTAL 383 JTS 2 7/8" 6.5# L-80 EUE 8RD TUBING MAKE SPLICE ON ESP CABLE @ HANGER. LAND TUBING HANGER W/ESP ASSY 12276' INSTALL TWC TEST 500 PSI ND BOP STACK, NU FMC 13 5/8 x 3 '/z" ADAPTER SPOOL, NU WKM 3 1/8" 5000# TREE TEST TREE & PACK OFF TO 5000 PSI - OK. PULL TWC VALVE, INSTALL BPV, RIG UP TO FREEZE PROTECT WELL. NOVEMBER 13, 1996 FREEZE PROTECT WELL W/59 BBLS BULLEADED DOWN ANNULUS & 13 BBLS BULLHEADED DOWN .TUBING @ 3/a BBLS MIN SITP 0 PSI, SICP 0 PSI. SECURE WELL RIG DOWN CELLAR, CLEAN PITS. WAIT ON 22E TO FINISH CEMENT JOB & RIG DOWN DIVERTER LINE & CLEAR RIG EQUIPEMENT FROM MPUK-37 LOCATION. RIG RELEASED @ 1500 HRS ON 11/12/96. t Page 2 of 2 F' E [7: H I 'T D A T A T D A T,'X .... F' L. U 8 ~ 'i i0.-.7563 TVL'., . 9,5 ~-~ (.) 25 ~ 1 O - 'J 29 i 5 i'4 D 'i .~ z: 95 .... 025 ~i2250 .... 'i28iS 'J ~ '1 ~290~-' 'J 272.3 9 r~ ..... 0 2 ~) ~E S /G R ,/' ''~ J",J F' ' :~ L D J '" ), ~ ~... i? :r hoodoo,! ~f,..,. O~, ch'- · ,".! 0 ',3 .,.'"' 2 ::~ "c~ - !~ 08/' 2 ,'3/' 35 .... z~ r) ~:)/' 2 ~:~ ./" 9 S ... ' '"9 :, aS/ 2:~,, . , , ,// ,/ . 05/" (.)~/' 9 S i0/i//90 Are dr"y d'i' tch sarnp'i es r"equ5 r'ed?:, yes, ~,,::',,r'~ d r"4.--.,<..~e 5' v,~..:' c..~">, 7 ~:;; ~~ Was:'; the ~ IRece~'ved? n I::t I I_1_ I IM G S E I::l~JI C E S R CEtVED OCT 1 7 1996 ,~daska Oil & Gas ~ns. Co,remission Anchoracje WELL LOG TRANSMITTAL To: State of Alaska October 17, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPF-37 AK-MM-950315 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Jan Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, iCG, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. APl#: 50-029-22548-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR REOOMPLETION REPORT .AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 95-25 "3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22548 4. Location of well at sudace 9. Unit or Lease Name . --- Milne Point Unit 1930' NSL, 2643' WEL, SEC. 6, T13N, R10Ei"V,.: ?.-.: .~. At top of productive interval 10. Well Number 4794' NSL, 1475' WEL, SEC. 36, T14N, R9E/)/z/(~/~,,_;;/','i'? ; i ;¢~': MPF-37 At total depth ~~.,,_:, ,r.~,,- .... ! !i : c..~_.~~=i 11. Field and Pool 5019' NSL, 1651' WEL, SEC. 36, T14N, R9 ,,,.z_ .._ -~- ;' Milne Point Unit / Kuparuk River 5. Elevation in feet (indicate KB, DF, etc.) 16?--L~al~,e'~DesiCnation and se-rial No. Sands KBE = 46.4' I ADL 355018 i12. Date Spudded. 03/20/95 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'115' water depth' if °ffsh°re ' 16' N°' °f C°mpleti°ns04/10/95 11/10/95 N/A MSL[ One 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~l. Thickness of Permafrosl 12915 7563 F-r1 12810 7486 FT~ []Yes i-]No I N/A MD| 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, Gyro, GR/RES/NEU/DEN 23. CASING, LINER AND CEMENTING RECORD CASING SE'Fi'lNG DEPTH HOLE SIZE VVT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# NT80LHE 37' 110' 30" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 36' 6621' 12-1/4" 1322 sx PF 'E', 250 sx 'G', 250 sx PF 'E' .. 7" 26# NT80S 35' 12900' 8-1/2" 202 sx Class 'G' 24. Perforations oPen to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) S~zE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6 spf 2-7/8", L-80 12279' N/A MD TVD MD TVD 12498'-12540' 7257'-7288' 12550'-12594' 7295'-7327' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect w/60 bbls diesel Fractured Kuparuk A w/163000# 16/20 carbolite 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 12/24/95 I ES P Date of Test;Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE } GAS-OIL RATIO TEST PERIOD · Flow Tubing Casing Pressure CALCULATED ° OIL-BBL GAS-MCF WATER-BBL O~L GRAVffY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED ORiGiNAL Alaska 01t & ~a~ Cons. (-;0,-FJffll~$1or~~ 0 ' ' Form 10-407 Rev. 07-01-80 Submit In Duplicate Geologic Markei~ 30. Formation Tests ....... Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. (Subsea) TKUA 12483' 7199' TKA3 12494' 7207' TKA2 12513' 7221' TKA1 12546' 7245' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and cp~'rect to the best of my knowledge s, .ed Tim Schofield ' _ Title Senior Drilling Engineer Date ~., / Prepared By Name/Number Kathy Campoamof, 564-5122 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pedinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 SUMMARY OF DAILY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: M PF-37 Rig Name: N-4ES AFE: 3301 1 1 Accept Date: I 1/06/95 Spud Date: Release Date: I 1/1 0/95 11/07/95 MIRU & BERM RIG, RAISE DERRICK. NU TO COMP TREE & TEST BRIDGE PLUG. ND COMP TREE & NU BOP'S. PULL HANGER & INSTALL TEST PLUG & TEST BOP'S. TEST WAIVED BY JERRY HERRING WITH AOGCC. RIG ACCEPTED 11/06/95 @ 23OO HRS. 11/08/95 PULL WR & SET. LOAD PIPE SHED W/2-7/8" & STRAP. PU 2-7/8" TUBING FROM SHED & RABBIT SAME. CIRC DOWN TO RBP @ 12123', EQUALIZE & RELEASE SAME. RIH TAG FILL @ 12153'. POOH T/12089'. CIRC COND HOLE, MONITOR WELL. OK. TOH W/RBP. 11/09/95 CONT TOH & LD RBP. MU BHA #2 & RIH & CUT DRLG LINE. TAG FILL @ 12150'. REV FRAC SAND FROM 7" CASING. WHILE WASHING THRU PERF, VIS SYSTEM WITH XANVIS & ADD LIQUID CASING. PUMP HOT DIESEL & DIRT MAGNET & XANVIS SWEEPS FOR FINAL CLEAN. HOLE QUIT GIVING BUT A TRIVIAL AMOUNT OF CARBOLITE BEFORE PUMPING SWEEPS. 11/10/95 CONT REV CIRC SWEEPS. SHUT DOWN & MONITOR WELL. WELL FLOWING ON BOTH SIDES. RAISE WEIGHT THROUGH CHOKE & WELL STABLE. POOH. MU ESP ASSY & CHECK. TIH W/ESP ASSY. SPLICE ESP CABLE. RIH W/ESP COMPLETION. 11/11/95 CONT TO RIH WITH ESP COMPLETION. MU ESP CABLE TO HANGER. LAND TUBING, RILDS LD LANDING JOINT & SET TWC. ND BOP'S. NU TREE & TEST SAME. PULL TWC & SET BPV. FREEZE PROTECT WELL & SECURE SAME. RIG RELEASED 11/10/95 @ 1500 HRS. Page BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: MP F-37 BOROUGH: NORTH SLOPE UNIT: UNKNOWN FIELD: UNKNOWN LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 03/29/95 06:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 27E WO/C RIG: NABORS 27E 03/28/95 (1) TD: 110'( 0) 03/29/95 (2) TD: 110'( 0) 03/30/95 (3) TD: 350' ( 240) 03/31/95 ( 4) TD: 2550' (2200) PLUMBING IN REMOTE BOILER MW: 0.0 VIS: 0 FINISH SETTING PITS, SET MOTOR COMPLEX, SET PIPE SHED. SUSPECT CRACKED TUBE IN BOTH BOILERS. OPEN SAME AND INSPECT. TUBE PLATES CRACKED. SPOT DIESEL STORAGE TANK AND CUTTINGS TANK W/ BERM. SPOT PIPE SHED TIOGA WITH BERM. OBTAIN 4 PORTABLE TIOGA HEATERS. OBTAIN REMOTE BOILER AND BERM SAME. WORK ON PLUMBING IN REMOTE BOILER. REMOVE FIRE BOX FROM REMOTE BOILER. INSTALL FIREBOX FROM RIG BOILER #1. RIG DOWN BILLER FEED PUMPS AND INSTALL 2 PUMPS IN REMOTE VAN. INSTALL CHECK VALVE AND SHUT IN VALVES. STRIP BOTH BOILERS ON RIG. START PLUMBING FEED LINES ON FEED PUMPS. PLUMBING IN BOILER AND STEAM LINE FROM BOILER TO RIG. SLOWLY START STEAM MW: 0.0 VIS: 0 PLUMB IN STEAM SUPPLY AND RETURN LINES, BLOWDOWN LINE, H20 FEED LINE, FUEL LINE TO BOILER VAN. SWAP OUT BURNER ASSEMBLY.AND WIRE UP SAME. CHANGE VOLTAGE ON FEED PUMPS. WIRE TRANSFORMER. REPAIR LIGHTS. START UP BOILER. TEST SHUTOFF, OK. STARTED STEAM AROUND MOTOR COMPLEX. ISOLATE SUB BASE FROM PIT COMPLEX. SLOWLY START STEAM AROUND SUB BASE. REMOVE FIREBOX FROM #2 BOILER ON RIG AND PREPARE RIG TO REMOVE BOTH BOILERS FROM RIG BOILER COMPLEX. WHILE TESTING BOILER VAN GO AHEAD AND NIPPLE UP 20" HYDRIL AND DIVERTER SYSTEM, FLOWLINE, MOUSEHOLE AND TURNBUCKLES. DRILLING MW: 0.0 VIS: 0 RIG DOWN BOILERS TO REMOVE FROM RIG. SET OUT BOILERS. SET IN #1 BOILER, LINE UP AND START PLUMBING IN. ACCEPT RIG @ 1800 HRS ON 03/29/95. MIX MUD. STRAP, OD, ID, BHA. MAKE UP BHA AND ORIENT. LOAD SOURCE AND PROGRAM MWD. CONTINUE TO MIX MUD, BUILD VOLUME. TAG BTM @ 110'. DRILL 12 1/4" HOLE TO 350'. DRILLING DRILL F/ 350 - 2550'. MW: 0.0 VIS: 0 04/01/95 ( 5) TD: 3658'(1108) DRILLING MW: 0.0 VIS: 0 DRILL F/ 2550 - 2975' CIRCULATE BOTTOMS UP. FRILL F/ 2975 - 3007' SHORT TRIP TO 751'. CHANGE OUT CENTER MUD END ON #2 MUD PUMP. RIH TO 3007'. NO FILL, NO PROBLEMS. DRILL F/ 3007 - 3658' WELL ' MP F-37 OPERATION: RIG : NABORS 27E PAGE: 2 04/02/95 (6) TD: 5911' (2253) 04/03/95 ( 7) TD: 6413' ( 502) 04/04/95 ( 8) TD: 6641' ( 228) 04/05/95 ( 9) TD: 6641' ( 0) 04/06/95 (10) TD: 7178'( 537) DRILLING MW: 0.0 VIS: 0 DRILL F/ 3658 - 4161'. REPAIR SPINNER ON IRON RUFFNECK. DRILL F/ 4161 - 5911' DRILLING MW: 0.0 VIS: 0 CIRCULATE BOTTOMS UP. CHECK FOR FLOW. PUMP PILL. POH. CHECK FOR FLOW @ HWDP. ATTEMPT TO DOWN LOAD MWD. NO CONTINUITY. BREAK OUT BIT, PIN ON BIT AND BOX ON MOTOR GALDED. CHANGE OUT MOTOR. MAKE UP NEW BIT. MADE ANOTHER ATTEMPT TO DOWNLOAD MWD, STILL NO CONTACT. CHANGE OUT MWD AND PULSER. LOAD MWD. CHANGE PULSER JET. ORIENT MWD. FINISH MAKE UP BHA. RIH W/ BHA #2. FILL PIPE @3685'. BREAK CIRCULATION. CONTINUE RIH, KELLY UP, WASH TO BTM, NO FILL. DRILL F/ 5911 - 6413'. RUN 98 5/8" CSG MW: 0.0 VIS: 0 DRILL F/ 6431 - 6641'. CIRCULATE BOTTOMS UP. CHECK FOR FLOW, PUMP PILL, SHORT TRIP TO 3785' RIH TO 5298' RUN MAD PASS F/ 5298 - 6055'. RIH TO 66~0', KELLY UP, CIRCULATE TO BTM, NO PROBLEM, NO FILL. PUMP SWEEP, CIRCULATE TILL HOLE CLEAN. CHECK FOR FLOW, PUMP PILL, POH. SLM NO CORRECTION. LAY DOWN BHA #2. DOWN LOAD MWD. FINISH LAY DOWN BHA. CLEAR FLOOR. LEVEL RIG. RIG UP TO RUN CSG. MU SHOE JTS AND CONTINUE TO RUN CSG. TEST BOPE MW: 0.0 VIS: 0 RUN 9 5/8" CSG, 161 JTS TOTAL, MU HGR AND LDG JT. MU CMT HEAD. BREAK CIRC, CIRCULATE, TEST LINES. CEMENT CSG. NO CMT TO SURFACE. RIG UP AND DO TOP JOB. RIG DOWN TOP JOB EQUIPMENT, FLUSH LINES. LAY DOWN ALL CSG TOOLS. NIPPLE DOWN DIVERTER SYSTEM. PREP HGR AND SPEEDHEAD AND INSTALL. SET STACK ON SPEEDHEAD. TEST SPEEDHEAD. FINISH NU BOPE, CHOKE AND KILL LINES. TIGHTEN TURNBUCKLES. INSTALL DRLG NIPPLE, HOOK UP FLOWLINE. INSTALL TEST PLUG. TEST BOPE. DRILLING MW: 0.0 VIS: 0 FINISH INSTALL WEAR RING. LD TEST JOINT. BLOW DOWN CHOKE MANIFOLD. STRAP, CALIPER, BHA. PU TURBINE. LD BEARING SECTION. PU NEW BEARING SECTION. PU STAB, XO'S, MWD. PLUG IN MWD AND LOAD SOURCES. FINISH PU BHA. SLIP 'N' CUT DRILLING LINE. ADJUST BRAKES. TEST CROWN-O-MATIC, OK. RIH TO 5498'. TEST CSG. SOLID TEST, NO BLEED OFF. STRIPPING DRILL. RIH TO 6408' CIRCULATE AND CONDITION MUD. DRILLOUT FC, CMT, SHOE AND 10' NEW HOLE. TAG FC ON DEPTH @ 6542' CIRCULATE AND CONDITION MUD. PERFORM LEAKOFF TEST. BEGIN BREAKOVER. BLEED DOWN. SHOE SET IN SAND STRINGER. DRILLING F/ 6631 - 7178' WELL - MP F-37 OPERATION: RIG : NABORS 27E PAGE: 3 04/07/95 (11) TD: 8508' (1330) 04/08/95 (12) TD:10215' (1707) 04/09/95 (13) TD:11539' ( 1324) 04/10/95 (14) TD:12706' (1167) 04/11/95 (15) TD: 12915' ( 209) 04/12/95 (16) TD:12915' ( 0) DRILLING MW: 0.0 VIS: 0 DRILLING F/ 7178 - 8159' CBU F/ SHORT TRIP. PUMP DRY JOB. SET BACK KELLY. FLOWCHECK WELL, OK. POH TO 9 5/8" SHOE AT 6621' MD. FLOWCHECK WELL, OK. RIH TO 7590' CHECK SURVEY. CONTINUE RIH TO 7685'. TAKE ANOTHER CHECK SURVEY. FINISH RIH TO 8116'. MONITOR WELL. RU ATLAS WL/GYRO DATA. WLIH TO 7621' AND RUN IN HOLE REFERENCE GYRO. WLOH. RD ATALS WL. PU KELLY AND DRILL FROM 8159 - 8508'. DRILLING MW: 0.0 VIS: 0 DRILLING FROM 8508 - 10215'. CBU FOR SHORT TRIP. FLOWCHECK WELL. PUMP DRY JOB. SET BACK KELLY. RIH AFTER SHORT TRIP MW: 0.0 VIS: 0 DRILLING F/ 10215 - 11539'. CBU. FLOWCHECK WELL, OK. PUMP DRY JOB. 20 STAND SHORT TRIP FROM 11539. HOLE SNUG FROM 10581 - 10360'. WORK THROUGH SEVERAL TIMES. CLEANED UP. RIH AFTER SHORT TRIP. DRILLING MW: 0.0 VIS: 0 FINISH RIH AFTER SHORT TRIP. DRILLING FROM 11539 - 12706'. FLOWCHECK WELL WHEN PENETRATE KUPARUK. OK. PREPARE MAD PASS MW: 0.0 VIS: 0 DRILLING FROM 12706 - 12915'. CIRCULATE BOTTOMS UP. FLOWCHECK WELL, OK. PUMP DRY JOB. SET BACK KELLY. POH. FLOWCHECK WELL AT SHOE, OK. DOWNLOAD MWD. LD PULSE, XO STAB, TURBINE, PU MWD, XO, STAB, BIT. LOAD MWD. INSTALL PULSE. RIH TO SHOE. BREAK CIRC AT SHOE. RIH TO 11436' BREAK CIRC. MAD PASS W/ LWD F/ 11498 - 12477' LD SIX SINGLES. PU KELLY. PREPARE TO MAD PASS WHILE ROTATE/CIRCUALTE ACROSS KUPARUK SANDS. CHANGING RAMS MW: 0.0 VIS: 0 MAD PASS FROM 12477 - 12850' SWEEP HOLE/CIRC AND CONDITION MUD. FLOW CHECK WELL. OK. PUMP DRY JOB. SET BACK KELLY. POH 18 STANDS. TIGHT HOLE @ 11165' ATTEMPT TO WORK PAST SEVERAL TIMES WITHOUT SUCCESS. PULL 400K AND HOLD. JARS FIRE AND WEIGHT FALLS OFF. CONTINUE POH. HOLE TIGHT F/ 11165 - 10615'. CONTINUE PULL TOTAL 26 STANDS. RIH AND SWEEP HOLE. CIRC AND CONDITION MUD AGAIN. FLOW ~CHECK WELL. OK. PUMP DRY JOB. SET BACK KELLY. POH 18 STANDS. AT 11165' PULL A LITTLE SNUG BUT PULLS THROUGH. CONTINUE POH 25 STANDS. POH LD DP. RIH W/ 25 STANDS F/ DERRICK. POH LD DP. LD HWDP AND DC'S. CHECK F/ FLOW AT HWDP AND DC'S. OK. DOWNLOAD MWD AND LD SAME. PULL WEAR RING. CHANGE RAMS. WELL · MP F-37 OPERATION: RIG : NABORS 27E 04/13/95 (17) TD:12915' ( 0) 04/14/95 (18) TD:12915 PB: 7563 CIRCULATE MW: 0.0 VIS: 0 CHANGE RAMS TO 7". TEST. RIG UP CSG TOOLS. RUN 312 JTS 7", 26# BTC CSG. CIRCULATE. MU CMT HEAD. CIRCULATE. RELEASE RIG MW: 0.0 CIRCULATE AND CONDITION FOR CMT JOB. FLUSH PUMP W/ WATER F/ DISPLACING. HOWCO TEST LINES. PERFORM CMT JOB. SWITCH TO RIG PUMPS, DISPLACE W/ 413 BBL SOURCE WATER, SWITCH TO HOWCO, PUMP 71.2 BBL DIESEL BUMP PLUG. ATTEMPT TO TEST CSG, XO LEAKED, CHECKED FLOATS. LAY DOWN CMT HEAD AND XO. MU SWAGE. TEST CSG. LAY DOWN LDG JT. INSTALL PACKOFF. ATTEMPT TO TEST. NO TEST. PULL PACKOFF. CHANGE BTM SEAL, INSTALL, RETEST. LAY DOWN MOUSE HOLE. REMOVE TURN BUCKLES FROM STACK. INSTALL FALSE BOWL, HGR, BPV. CHANGE RAMS TO 5". ND CHOKE AND KILL LINE, FLOWLINE, RISER. SET BOPS BACKK AND TIE OFF. NU ADAPTOR, 7" VALVE AND TREE CAP. FREEZE PROTECT ANNULUS. BLOW DOWN LINES, CLEAN CELLAR. RELEASE RIG @ 0600 HRS 04/14/95. SIGNATURE: (drilling superintendent) DATE: SPF--~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/95 DATE OF SURVEY: 041295 MWD SURVEY JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -47.00 100 100.00 53.00 200 200.00 153.00 300 299.99 252.99 400 399.99 352.99 0 0 0 27 0 18 0 22 0 34 N .00 E .00 .00N .00E N 21.71 W .45 .36N .15W N 52.38 W .24 .89N .50W N 10.09 W .25 1.38N .78W N 29.70 W .25 2.13N 1.08W .00 .39 1.03 1.58 2.38 500 499.99 452.99 600 599.98 552.98 700 699.97 652.97 800 799.94 752.94 900 899.88 852.88 0 34 0 29 1 10 1 28 2 29 N 61.70 W .32 2.80N 1.77W N 55.61 W .11 3.28N 2.57W N 53.05 W .69 4.14N 3.74W N 55.23 W .29 5.49N 5.62W N 29.29 W 1.33 8.12N 7.74W 3.29 4.07 5.35 7.38 10.66 1000 999.66 952.66 1100 1099.30 1052.30 1200 1198.87 1151.87 1300 1298.28 1251.28 1400 1397.30 1350.30 4 40 5 3 5 37 6 46 9 5 N 25.09 W 2.20 13.71N 10.53W N 14.31 W .99 21.68N 13.35W N 12.23 W .60 30.74N 15.48W N 13.89 W 1.16 41.27N 17.94W N 16.59 W 2.34 54.57N 21.61W 16.91 25.31 34.41 44.97 58.55 1500 1495.75 1448.75 1600 1593.82 1546.82 1700 1691.49 1644.49 1800 1788.52 1741.52 1900 1884.94 1837.94 10 59 11 34 13 11 14 44 15 59 N 23.94 W 2.29 70.85N 27.73W N 27.90 W .97 88.42N 36.29W N 26.55 W 1.65 107.49N 46.08W N 25.98 W 1.56 129.13N 56.76W N 24.87 W 1.28 153.07N 68.12W 75.88 95.43 116.86 140.99 167.48 2000 1980.51 1933.51 2100 2074.21 2027.21 2200 2165.15 2118.15 2300 2253.52 2206.52 2400 2339.53 2292.53 18 10 22 39 26 27 29 20 31 58 N 26.61 W 2.24 179.50N 80.90W N 26.58 W 4.49 210.69N 96.51W N 26.77 W 3.79 247.81N 115.17W N 25.70 W 2.93 289.78N 135.83W N 24.72 W 2.69 335.92N 157.53W 196.84 231.71 273.25 320.02 371.01 2500 2423.33 2376.33 2600 2504.87 2457.87 2700 2583.67 2536.67 2800 2659.79 2612.79 2900 2734.38 2687.38 34 7 36 36 39 22 41 27 42 4 N 24.22 W 2.17 385.56N 180.11W N 25.76 W 2.64 438.01N 204.58W N 25.67 W 2.77 493.46N 231.29W N 26.33 W 2.12 551.73N 259.72W N 25.79 W .71 611.56N 288.97W 425.54 483.41 544.96 609.79 676.39 3000 2807.39 2760.39 3100 2878.41 2831.41 3200 2947.02 2900.02 3300 3012.20 2965.20 3400 3073.69 3026.69 44 45 48 50 53 7 21 0 38 27 N 25.50 W 2.06 673.14N 318.54W N 26.54 W 1.44 736.39N 349.42W N 24.50 W 3.03 802.04N 380.73W N 23.79 W 2.69 871.24N 411.74W N 24.36 W 2.85 943.22N 443.91W 744.70 815.08 887.82 963.63 1042.44 ~PF~-~,-RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/95 DATE OF SURVEY: 041295 MWD SURVEY JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3500 3131.94 3084.94 3600 3188.22 3141.22 3700 3243.37 3196.37 3800 3296.55 3249.55 3900 3346.35 3299.35 55 17 N 23.84 W 1.89 1017.41N 477.09W 56 12 N 23.12 W 1.10 1093.22N 510.02W 56 50 N 23.09 W .64 1169.95N 542.75W 58 52 N 24.22 W 2.24 1247.49N 576.73W 61 22 N 24.34 W 2.49 1326.51N 612.38W 1123.68 1206.28 1289.62 1374.24 1460.91 4000 3394.46 3347.46 4100 3441.24 3394.24 4200 3486.25 3439,25 4300 3531.08 3484.08 4400 3575.82 3528.82 4500 3620.68 3573.68 4600 3664.60 3617.60 4700 3707.72 3660.72 4800 3751.17 3704.17 4900 3794.65 3747.65 61 7 N 25.46 W 1.01 1406.03N 649.29W 63 4 N 24.47 W 2.15 1486.14N 686.57W 63 25 N 24.05 W .51 1567.55N 723.26W 63 19 N 23.99 W .11 1649.20N 759.65W 63 31 N 24.55 W .54 1730.72N 796.41W 63 10 N 25.46 W .88 1811.72N 834.19W 64 41 N 24.90 W 1.60 1893.01N 872.40W 64 13 N 23.71 W 1.18 1975.24N 909.54W 64 16 N 24.05 W .31 2057.59N 946.00W 64 10 N 24.10 W .10 2139.81N 982.73W 1548.57 1636.92 1726.20 1815.56 1904.97 1994.33 2084.16 2174.36 2264.39 2354.41 5000 3838.21 3791.21 5100 3882.13 3835.13 5200 3925.94 3878.94 5300 3969.25 3922.25 5400 4012.42 3965.42 64 10 N 23.93 W .15 2222.03N 1019.37W 63 42 N 23.65 W .53 2304.24N 1055.61W 64 19 N 22.13 W 1.50 2387.04N 1090.57W 64 20 N 21.17 W .87 2470.82N 1123.82W 64 30 N 23.02 W 1.68 2554.38N 1157.74W 2444.39 2534.19 2623.97 2713.90 2803.92 5500 4055.55 4008.55 5600 4099.38 4052.38 5700 4144.13 4097.13 5800 4187.60 4140.60 5900 4229.89 4182.89 64 22 N 24.20 W 1.07 2637.04N 1193.87W 63 37 N 23.00 W 1.31 2719.40N 1229.86W 63 12 N 23.80 W .83 2801.47N 1265.37W 65 15 N 24.19 W 2.09 2883.73N 1301.99W 64 42 N 25.15 W 1.03 2966.08N 1339.81W 2894.08 2983.91 3073.27 3163.28 3253.88 6000 4271.82 4224.82 6100 4312.56 4265.56 6200 4352.74 4305.74 6300 4392.59 4345.59 6400 4432.09 4385.09 65 42 N 24.11 W 1.38 3048.60N 1377.64W 66 11 N 23.96 W .51 3132.00N 1414.84W 66 25 N 24.47 W .52 3215.51N 1452.40W 66 36 N 24.52 W .19 3298.98N 1490.42W 66 51 N 25.13 W .61 -- 3382.35N 1528.99W 3344.65 3435.94 3527.48 3619.18 3711.04 6500 4472.01 4425.01 6600 4512.56 4465.56 6700 4552.70 4505.70 6800 4591.98 4544.98 6900 4630.59 4583.59 66 4 N 24.91 W .81 3465.43N 1567.77W 66 4 N 23.84 W .98 3548.69N 1605.49W 66 35 N 24.57 W .85 3632.23N 1643.04W 67 9 N 24.47 W .56 3715.90N 1681.21W 67 25 N 24.14 W .41 3799.96N 1719.18W 3802.72 3894.11 3985.67 4077.62 4169.84 I?FCE VFD SpF~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SI~LARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/9 DATE OF SURVEY: 041295 MWD SURVEY JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6990 4665.11 4618.11 7020 4676.57 4629.57 7050 4687.98 4640.98 7080 4699.32 4652.32 7110 4710.63 4663.63 67 28 67 34 67 43 67 51 67 51 N 25.07 W .96 .- 3875.53N 1753.78W N 25.01 W .35 3900.65N 1765.52W N 24.50 W 1.66 3925.84N 1777.13W N 24.49 W .43 3951.12N 1788.65W N 25.25 W 2.35 3976.33N 1800.34W 4252.95 4280.67 4308.41 4336.18 4363.96 7140 4721.92 4674.92 67 55 7170 4733.25 4686.25 67 40 7200 4744.69 4697.69 67 30 7230 4756.39 4709.39 66 35 7260 4768.56 4721.56 65 31 N 25.08 W .56 4001.49N 1812.16W N 25.99 W 2.92 4026.55N 1824.13W N 25.55 W 1.48 4051.52N 1836.19W N 26.50 W 4.21 4076.35N 1848.30W N 25.55 W 4.59 4100.98N 1860.33W 4391.76 4419.53 4447.27 4474.89 4502.30 7290 4781.00 4734.00 65 30 7320 4793.46 4746.46 65 22 7350 4806.00 4759.00 65 12 7380 4818.57 4771.57 65 15 7410 4831.11 4784.11 65 19 N 26.28 W 2.21 4125.54N 1872.27W N 25.94 W 1.12 4150.04N 1884.28W N 26.32 W 1.28 4174.51N 1896.28W N 26.74 W 1.28 4198.88N 1908.45W N 26.36 W 1.18 4223.26N 1920.63W 4529.60 4556.89 4584.14 4611.38 4638.63 7440 4843.58 4796.58 65 34 7470 4856.00 4809.00 65 30 7500 4868.45 4821.45 65 27 7530 4880.93 4833.93 65 22 7560 4893.42 4846.42 65 24 N 26.70 W 1.30 4247.67N 1932.82W N 26.87 W .55 4272.05N 1945.12W N 26.24 W 1.92 4296.47N 1957.32W N 25.42 W 2.50 4321.02N 1969.21W N 24.86 W 1.70 4345.71N 1980.80W 4665.91 4693.21 4720.50 4747.78 4775.06 7590 4905.92 4858.92 7620 4918.39 4871.39 7650 4930.81 4883.81 7680 4943.23 4896.23 7707 4954.38 4907.38 65 21 65 31 65 33 65 33 65 39 N 24.73 W .42 4370.47N 1992.23W N 25.65 W 2.84 4395.16N 2003.85W N 25.51 W .43 4419.79N 2015.64W N 25.41 W .30 4444.45N 2027.38W N 25.21 W .79 4466.68N 2037.89W 4802.33 4829.61 4856.92 4884.23 4908.82 7790 4988.72 4941.72 65 41 7885 5027.55 4980.55 65 58 7979 5066.32 5019.32 65 43 8073 5105.20 5058.20 65 13 8167 5144.66 5097.66 65 18 N 25.62 W .45 4535.30N 2070.50W N 26.44 W .84 4613.05N 2108.47W N 26.18 W .36 4690.56N 2146.79W N 26.10 W .54 4767.03N 2184.32W N 26.29 W .20 4843.88N 2222.13W 4984.79 5071.32 5157.77 5242.96 5328.60 8263 5184.20 5137.20 65 36 8356 5222.72 5175.72 65 50 8452 5261.80 5214.80 65 55 8547 5300.56 5253.56 65 43 8641 5339.73 5292.73 65 14 N 26.35 W .33 4921.48N 2260.52W N 26.88 W .57 4997.85N 2298.78W N 27.97 W 1.04 5075.31N 2338.98W N 27.38 W .61 5151.77N 2379.08W N 26.46 W 1.02 5228.32N 2417.95W 5415.17 5500.57 5587.79 5674.06 5759.89 RECEIVED SPER, RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/95 DATE OF SURVEY: 041295 MWD SURVEY JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS DIRECTION DEGREES DG/100 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERT. SECT. 8737 5379.93 5332.93 8832 5419.11 5372.11 8926 5457.95 5410.95 9021 5496.32 5449.32 9116 5535.56 5488.56 65 24 65 36 65 58 65 52 65 30 N 27.32 W .83 N 26.70 W .63 N 26.41 W .48 N 24.97 W 1.40 N 24.37 W .69 5306.36N 2457.53W 5847.38 5382.99N 2496.58W 5933.35 5460.27N 2535.21W 6019.74 5537.68N 2572.45W 6105.64 5616.63N 2608.71W 6192.51 9211 5574.50 5527.50 9305 5612.88 5565.88 9400 5651.46 5604.46 9494 5690.72 5643.72 9588 5730.10 5683.10 65 54 66 12 65 41 65 7 65 24 N 25.18 W .89 N 24.63 W .62 N 25.83 W 1.28 N 25.59 W .64 N 25.14 W .52 5694.97N 2644.87W 6278.78 5773.39N 2681.28W 6365.24 5851.57N 2718.12W 6451.66 5928.87N 2755.33W 6537.45 6006.11N 2791.95W 6622.94 9684 5769.84 5722.84 9779 5809.03 5762.03 9873 5847.49 5800.49 9970 5887.42 5840.42 10065 5927.03 5880.03 65 26 65 46 66 0 65 28 65 7 N 25.54 W .38 N 23,53 W 1.96 N 24.72 W 1.18 N 26.60 W 1.85 N 27.35 W .81 6084.66N 2829.15W 6709.84 6163.30N 2865.04W 6796.27 6241.74N 2900.18W 6882.20 6321.58N 2938.53W 6970.78 6398.33N 2977.59W 7056.86 10160 5966.80 5919.80 10253 6005.43 5958.43 10347 6044.49 5997.49 10443 6083.44 6036.44 10537 6121.74 6074.74 65 17 65 34 65 46 65 55 66 5 N 25.79 W 1.50 N 26,24 W .53 N 25.94 W .36 N 26.63 W .68 N 26.14 W .50 6475.30N 3016.08W 7142.91 6551.25N 3053.15W 7227.41 6628.83N 3091.14W 7313.80 6706.71N 3129.60W 7400.65 6783.81N 3167.85W 7486.70 10631 6159.98 6112.98 10726 6198.40 6151.40 10819 6236.18 6189.18 10915 6277.64 6230.64 11009 6321.39 6274.39 66 6 66 13 65 50 62 51 61 48 N 26.27 W .13 N 27.02 W .73 N 27,36 W .53 N 27,56 W 3.13 N 26.38 W 1.57 6861.23N 3205.96W 7572.99 6938.98N 3244.97W 7659.96 7014.61N 3283.82W 7744.95 7091.24N 3323.64W 7831.26 7165.61N 3361.49W 7914.68 11104 6367.31 6320.31 11199 6415.01 6368.01 11294 6465.08 6418.08 11388 6516.98 6469.98 11485 6573.21 6526.21 60 26 59 2 57 12 55 54 53 15 N 27.20 W 1.63 N 27.74 W 1.55 N 28.32 W 2.02 N 29,29 W 1.63 N 31,95 W 3.52 7239.93N 3399.01W 7997.92 7312.49N 3436.73W 8079.65 7383.57N 3474.57W 8160.10 7452.40N 3512.41W 8238.53 7520.45N 3552.65W 8317.27 11579 6630.67 6583.67 11671 6688.86 6641.86 11767 6750.00 6703.00 11860 6811.61 6764.61 11956 6875.24 6828.24 51 28 50 9 49 58 47 56 48 26 N 32.39 W 1.94 N 33.24 W 1.60 N 32.20 W .86 N 32,65 W 2.20 N 32.76 W .53 7583.53N 3592.32W 8391.29 7643.51N 3631.00W 8462.09 7704.95N 3670.47W 8534.54 7764.69N 3708.41W 8604.81 7824.56N 3746.86W 8675.41 RECEIVED SPErRY-suN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 SHARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/95 DATE OF SURVEY: 041295 MWD SURVEY JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 12052 6938.88 6891.88 48 12 N 32.77 W .24 7884.68N 3785.55W 8746.33 12145 7003.05 6956.05 44 49 N 31.50 W 3.76 7941.96N 3821.55W 8813.54 12240 7070.78 7023.78 44 30 N 30.89 W .56 7999.23N 3856.23W 8880.17 12335 7138.73 7091.73 44 2 N 33.96 W 2.31 8055.14N 3891.74W 8945.93 12430 7207.46 7160.46 43 16 N 35.83 W 1.58 8108.92N 3929.24W 9010.62 12524 7276.13 7229.13 43 15 N 37.10 W .92 8160.90N 3967.66W 9074.08 12618 7344.48 7297.48 42 47 N 37.21 W .51 8211.74N 4006.18W 9136.57 12712 7414.07 7367.07 42 32 N 38.64 W 1.06 8262.34N 4045.61W 9199.23 12807 7483.79 7436.79 42 34 N 38.49 W .11 8312.40N 4085.52W 9261.60 12827 7498.38 7451.38 42 31 N 38.82 W 1.15 8322.86N 4093.88W 9274.64 12915 7562.92 7515.92 42 31 N 38.82 W .00 8368.96N 4130.98W 9332.24 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 9332.98 FEET AT NORTH 26 DEG. 16 MIN. WEST AT MD = 12915 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 334.45 DEG. RECEIVED SpF-mRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/95 DATE OF SURVEY: 041295 JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -47.00 .00 N .00 E .00 1000 999.66 952.66 13.71 N 10.53 W .34 2000 1980.51 1933.51 179.50 N 80.90 W 19.49 3000 2807.39 2760.39 673.14 N 318.54 W 192.61 4000 3394.46 3347.46 1406.03 N 649.29 W 605.54 .34 19.15 173.13 412.93 5000 3838.21 3791.21 2222.03 N 1019.37 W 1161.79 6000 4271.82 4224.82 3048.60 N 1377.64 W 1728.18 7000 4668.94 4621.94 3883.90 N 1757.70 W 2331.06 8000 5074.55 5027.55 4706.94 N 2154.84 W 2925.45 9000 5487.71 5440.71 5520.26 N 2564.34 W 3512.29 556.25 566.39 602.88 594.38 586.84 10000 5899.62 5852.62 6345.50 N 2950.51 W 4100.38 11000 6316.72 6269.72 7157.81 N 3357.62 W 4683.28 12000 6904.16 6857.16 7851.98 N 3764.50 W 5095.84 12915 7562.92 7515.92 8368.96 N 4130.98 W 5352.08 588.09 582.90 412.57 256.24 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. sPF~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/95 DATE OF SURVEY: 041295 JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -47.00 .00 N .00 E .00 47 47.00 .00 .03 N .01 W .00 147 147.00 100,00 .69 N .29 W .00 247 247.00 200.00 1.06 N .69 W .00 347 347.00 300.00 1.68 N .84 W .01 .00 .00 .00 .00 447 447.00 400.00 2.52 N 1.32 W .01 547 547.00 500.00 3.03 N 2.18 W .02 647 647.00 600.00 3.54 N 2.93 W .02 747 747.00 700.00 4.73 N 4.54 W .04 847 847.00 800.00 6.26 N 6.61 W .08 .01 .01 .00 .02 .03 947 947.00 900.00 10.04 N 8.79 W .17 1047 1047.00 1000.00 17.26 N 12.13 W .50 1147 1147.00 1100.00 25.81 N 14.39 W .89 1248 1247.00 1200.00 35.46 N 16.52 W 1.38 1349 1347.00 1300.00 47.06 N 19.40 W 2.09 .10 .32 .39 .49 .72 1450 1447.00 1400.00 62.31 N 24.05 W 3.36 1552 1547.00 1500.00 79.97 N 31.87 W 5.22 1654 1647.00 1600.00 98.25 N 41.45 W 7.33 1757 1747.00 1700.00 119.35 N 51.99 W 10.08 1860 1847.00 1800.00 143.20 N 63.55 W 13.53 1.27 1.85 2.11 2.75 3.46 1964 1947.00 1900.00 169.67 N 75.97 W 17.73 2070 2047.00 2000.00 200.89 N 91.61 W 23.67 2179 2147.00 2100.00 239.88 N 111.17 W 32.80 2292 2247.00 2200.00 286.52 N 134.25 W 45.54 2408 2347.00 2300.00 340.15 N 159.48 W 61.80 4.20 5.94 9.13 12.74 16.26 2528 2447.00 2400.00 400.38 N 186.86 W' 81.73 2653 2547.00 2500.00 466.99 N 218.55 W 106.01 2782 2647.00 2600.00 541.60 N 254.70 W 135.93 2917 2747.00 2700.00 621.82 N 293.93 W 170.01 3055 2847.00 2800.00 707.98 N 335.26 W 208.34 19.92 24.28 29.93 34.07 38.34 3199 2947.00 2900.00 802.02 N 380.72 W 252.97 3355 3047.00 3000.00 911.14 N 429.47 W 308.84 3526 3147.00 3100.00 1037.29 N 485.87 W 379.44 3706 3247.00 3200.00 1175.06 N 544.93 W 459.64 3901 3347.00 3300.00 1327.59 N 612.87 W 554.35 44.63 55.87 70.61 80.19 94.71 RECEIVED SP~RY-SUN DRILLING SERVICES ,. ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/95 DATE OF SURVEY: 041295 JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 4112 3447.00 3400.00 4335 3547.00 3500.00 4558 3647.00 3600.00 4790 3747.00 3700.00 5020 3847.00 3800.00 1496.45 N 691.27 W 665.71 111.36 1678.15 N 772.53 W 788.46 122.75 1859.27 N 856.73 W 911.84 123.38 2049.69 N 942.47 W 1043.40 131.55 2238.64 N 1026.74 W 1173.19 129.79 5248 3947.00 3900.00 5480 4047.00 4000.00 5706 4147.00 4100.00 5940 4247.00 4200.00 6185 4347.00 4300.00 2427.67 N 1107.02 W 1301.63 128 2620.77 N 1186.56 W 1433.22 131 2806.66 N 1267.66 W 1559.36 126 2998.86 N 1355.20 W 1693.06 133 3203.55 N 1446.95 W 1838.65 145 .44 .59 .14 .70 .60 6437 4447.00 4400.00 6685 4547.00 4500.00 6942 4647.00 4600.00 7205 4747.00 4700.00 7448 4847.00 4800.00 3413.94 N 1543.81 W 1990.94 152.29 3620.24 N 1637.56 W 2138.64 147.70 3835.96 N 1735.34 W 2295.74 157.10 4056.49 N 1838.59 W 2458.98 163.25 4254.40 N 1936.20 W 2601.27 142.29 7689 4947.00 4900.00 7932 5047.00 5000.00 8173 5147.00 5100.00 8416 5247.00 5200.00 8658 5347.00 5300.00 4451.95 N 2030.93 W 2742.12 140 4652.08 N 2127.86 W 2885.95 143 4848.44 N 2224.38 W 3026.51 140 5046.06 N 2323.46 W 3169.16 142 5242.44 N 2424.98 W 3311.80 142 .84 .83 .57 .64 .64 8900 5447.00 5400.00 9143 5547.00 5500.00 9389 5647.00 5600.00 9629 5747.00 5700.00 9872 5847.00 5800.00 5438.27 N 2524.29 W 3453.08 141 5639.51 N 2619.08 W 3596.99 143 5842.69 N 2713.82 W 3742.48 145 6039.53 N 2807.65 W 3882.37 139 6240.74 N 2899.71 W 4025.22 142 .28 .91 .49 .90 .84 10112 5947.00 5900.00 10354 6047.00 6000.00 10599 6147.00 6100.00 10845 6247.00 6200.00 11063 6347.00 6300.00 6436.65 N 2997.28 W' 4165.87 140 6633.84 N 3093.58 W 4307.04 141 6834.96 N 3192.99 W 4452.66 145 7035.58 N 3294.69 W 4598.83 146 7208.09 N 3382.65 W 4716.81 117 .66 .17 .62 .17 .98 11261 6447.00 6400.00 11441 6547.00 6500.00 11605 6647.00 6600.00 11762 6747.00 6700.00 11913 6847.00 6800.00 7358.87 N 3461.26 W 4814.11 7489.78 N 3533.99 W 4894.22 7600.84 N 3603.31 W 4958.99 7701.93 N 3668.57 W 5015.45 7797.80 N 3729.64 W 5066.87 97.30 80.10 64.78 56.46 51.42 RECF_I\/FD Alaska Oit & Gas Ccns. SPF~nRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING MILNE POINT/MPF-37 500292254800 NORTH SLOPE BOROUGH COMPUTATION DATE: 4/26/95 DATE OF SURVEY: 041295 JOB NUMBER: AK-MM-950315 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 12064 6947.00 6900.00 7892.24 N 3790.39 W 5117.24 12207 7047.00 7000.00 7979.17 N 3844.23 W 5160.29 12347 7147.00 7100.00 8061.77 N 3896.21 W 5200.04 12484 7247.00 7200.00 8139.03 N 3951.12 W 5237.83 12621 7347.00 7300.00 8213.60 N 4007.59 W 5274.76 .. 50.36 43.05 39.75 37.79 36.93 12757 7447.00 7400.00 8285.95 N 4064.48 W 5310.68 12893 7547.00 7500.00 8357.59 N 4121.83 W 5346.40 12915 7562.92 7515.92 8368.96 N 4130.98 W 5352.08 35.91 35.72 5.68 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive ~/~. 0"2..~'~ Anchorage, Alaska 99501 August 27, 1995 RE: MWD Formation Evaluation Logs -- MP F-37, AK-MM-950315 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2" x 5" MD Resistivity and Gamma Ray Logs: 1 Blueline 1 Rev. Folded Sepia 2" x 5" TVD Resistivity and Gamma Ray Logs: 1 Blueline 1 Rev. Folded Sepia 2" x 5" MD Neutron and Density Logs' AU-~ ~6B!~e 1 ~'.~olded Sepia A!~e-~ 0ii ~ Gas (,'ans. Cornrnis · 2" x 5" TVD Neutron and Density Logs: gnch0~a~lueline 1 Rev. Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 27 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ECC No. Run # 1 6408.00 Run # 1 6409.00 Run # 1 6410.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign snd ~e~u~n ~.~ F'etro~eehnieal Data Cente~ BP Exploration (Alaska) lno 90~;ast Benson ~-- - Dat~ ~M~ 1995 ,.. ..... NI~ ~ill ~ ~ ¢~, Commission LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 24 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF ECC No. Run # 1 6406.01 Run # 1 ' 6409.01 Run # 1 6410.01 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please si~n and ~eturn ~0$ Petroteohnteal-Dat~ Cente~ BP Exploration (Alaska) Ina 900 EaSt Benson Boulevard iVED '~ ~ MAY 0 4 1995 ~ ~aska 0 & Gas C~ns. Commissio~ ~c~orage BP EXPLORATION To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: David Johston, Chairman Date' April 28, 199.~ , COMM L~ RES ENG SR ENG SR ENG ENG ASST ENG ASST SR GEOL ;GEOL ASSTI tGEOL ASSTI ~- STAT TEC Subject: Milne Point Unit Drilling Operations - Clarification Per our conversation with Blair Wondzell on April 26, we would like to clarify our drilling operations at Miine Point unit F and L pads. MPL-17 (Permit # 94-169). Drilled surface hole and set 9-5/8" surface casing at 3650'. Drilled to 8788' MD and set 7" casing across the Kuparuk sands. The well was suspended with source water in the casing and a 7" retrievable bridge plug set at 3025'. The well will be perforated, hydraulically sand frac'd and cleaned out with coiled tubing without a rig on the well. The well will be completed by a rig as an ESP completion with 2-'7/8" tubing at a later date. MPL-29 (Permit # 95-009). Drilled surface hole and set 9-5/8" surface casing at 7676' in January, 1995. The well was suspended with a dry hole tree in order to move N27E to the newly set MPF-pad and drill several development wells before break-up and pad compacting operations commenced. N27E will be moving back to MPL-29 in early May to complete drilling operations on this well. The well will be completed with 3-1/2" tubing by N27E as a Kuparuk water injection well. MPF-25 (Permit # 95-16). Drilled surface hole and set 9-5/8" surface casing at 3425'MD. Drilled to 11502'MD and set 7" casing across the Kuparuk sands. The well was perforated and hydraulically sand frac'd without a rig and will be cleaned out with coiled tubing. The well will be completed by a rig as an ESP completion with 2-7/8" tubing this fall. MPF-13 (Permit # 95-27). Drilled surface hole and set 9-5/8" surface casing at 3968'MD. Drilled to 10975'MD and set 7" casing across the Kuparuk sands. The well was perforated and hydraulically sand frac'd without a rig and will be cleaned out with coiled tubing. The well will be completed by a rig as an ESP completion with 2-7/8" tubing this fall. RECEIVED MAY-2 1995 Alask~.0il & Gas Cons. Comm~ion ~chorage MPF-37 (Permit # 95-25). Drilled surface hole and set 9-5/8" surface casing at 6621'MD, Drilled to 12915'MD and set 7" casing across the Kuparuk sands. The well was perforated and hydraulically sand frac'd without a rig and will be cleaned out with coiled tubing, The well will be completed by a rig as an ESP completion with 2-7/8" tubing this fall. MPF-01 (Permit #95-45). Drilled surface hole and set 9-5/8" surface casing at 7124'MD, Drilled to 12941'MD and set 7" casing across the Kuparuk sands. The well will be perforated and hydraulically sand frac'd without a rig and then cleaned out with coiled tubing. The well will be completed by a rig as an ESP completion with 2-7/8" tubing this fail. Yours Sincerely, ~~~.: ,~rian Clark Drilling Engineer Supervisor cc. Well file REEEIVED MAY-2 ]995 Oil & Gas Cons. ~ommission Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 19 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION GR/CCL FINAL BL+RF GR/CCL FINAL BL+RF GR/CCL FINAL BL+RF ECC No. Run # 1 6408.00 Run # 1 6409.00 Run ~ 1 6410.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, -AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and return to: Petrotechnical Data Cente~ ~P Exploration (Alaska) In~ 9.00 East Benson Boulevard Reeeive~ bY ....... ~- ~ ..... . RECEIVED APB, Alaska Oil & Gas Cons. Commission Anchorage i; ,.: CONSERVATION COMMISSION TONY KNOWLE$o GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 March 8, 1995 Adrian Clark Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 106612 Anchorage, AK 99519-6612 Re: Milne Point Unit MPF-37 BP Exploration (Alaska), Inc. Permit No. 95-25 Sur. Loc. 1931'NSL, 2643'WEL, Sec. 6, T13N, R10E, UM Btmnhole Loc. 5091'NSL, 1519'WEL, Sec. 36, T14N, R9E, UM Dear Mr. Clark: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on th~-Nurth~~pager at 659-3607. / f ~ ~ David W. Joh~ton Chairman BY ORDER OF THE C~~ISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] RedrillFI lb. Type of well. Exploratoryl--I Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone [] '2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 32.5' feet Milne Point Unit- Kuparuk 3. Address 6. Property Designation Sands P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355018 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1931' NSL, 2643' WEL, SEC. 6, T13N, RIOE Milne Point Unit At top of productive interval 8. Well number Number 4880' NSL, 1421' WEL, SEC. 36, T14N, R9E MPF-37 2S100302630-277 At total depth 9. Approximate spud date Amount 5091' NSL, 1519' WEL, SEC. 36, T14N, R9E 3/17/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVU) property line ADL 355023 feet No close approach feet 2560 13065' MD/7618' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 800 feet Maximum hole angle 8z o Maximum surface 2719 psig At total depth (TVD) 7240/3448 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 30" 20" 91.1# NTSOLHE Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 12-1/4" 9-5/8" 40# L-80 BTRC 6832' 31' 31' 6863' 4524' 1322 sx PF "E"/250 sx "G"/250 sx PF "E" 8-1/2" 7" 26# L-80 BTRC 13035' 30' 30' 13065' 7618' 202 sx Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate FEB 2 4 1995 Production Liner A!SSk~ Oil & Gas Cons. Commission Perforation depth: measured Anchora,!e true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth pict [] Refraction analysis [-I Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby cj~rtify that the foregoing is true and correct to the best of my knowledge Signed ~J/' ' ~44'¢ - '~~~ /~'~-' CommissionTitleuseDri//ingonlyEngineer Supervisor D at eo,2~, ,/~"'~'- Perrr~j,t Number APl number IApproval date _ See cover letter I for other requirements Cor~ditions of approval Samples required [] Yes [] No Mud Icg required []Yes [] No Hydrogen sulfide measures [] Yes [] No Directional survey required ]~ Yes [] No Required working pressure for BOPE i-12M; 1-13M;_ J~!~SM; I-I10M; I-I15M; Other: Original Signed By by order of,.~//~//~~' j~//~ Approved by David W, Johnston Commissioner me commission Date Form 10-401 Rev. 12-1-85 Submit id plicate [Well Name: I MPF-37 Well Plan Summary I Type of Well (producer or injector): I Kuparuk Producer ISurface Location' Target Location· Bottom Hole Location' 1931' FSL 2643' FEL Sec 06 T13N R10E UM., AK. 4880' FSL 1421' FEL Sec 36 T14N R9E UM., AK. 5091' FSL 1519' FEL Sec 36 T14N R9E UM., AK. [AFE Number: I Estimated Start Date: [ March 17' I19 9 S I°perating days t° aFl'land case' 7618' [MD: [13065' [ [Welletc.). Design (conventional, slimhole, ! UltraSlimhole [ 330111 [ I Rig: [ Nabors 27E I KBE · [32.5' Formation Markers: Formation Tops MD TVD (ss) Formation Pressure/EMW base permafrost 181 O' 1750' n/a MA n/a n/a n/a NA (Top Schrader) 5435' 3920' 1643 psig / 8.0 ppg CA 5954' 4100' 1718 psig / 8.0 ppg Base Schrader Bluff 6664' 4400' 1830 psig / 8.0 ppg Top HRZ 11998 6868' n/a Base HRZ 12014 6878' n/a Kupark D Shale 12310' 7068' n/a Top Kuparuk A 12659' 7240' 3448 psig / 9.1 ppg Target 12659' 7240' 3448 psig / 9.1 ppg Total Depth 13065' 7 618' n/a Casin , '/Tubin: Pro ram' Hole Csg/ Wt/Ft Grade Con Length Top Btm Size Tbg n MD/TVD MD/TVD O.D. 30" 20" 91.1# NT80LHE weld 80 32/32 112/112 12 1/4" 9 5/8" 40g L-80 btm 6832 31/31 6863/4524 8 1/2" 7" 26g L-80 btrc 13035 30/30 13065/7618 N/A (tbg) 2-7/8" 6.5# L-80 EUE 12521 29/29 12550/7197 8rd rn v, r- KEL-IV r-~ FEB 2 4 1995 0il & Gas Cons. Commission Anchorz Internal yield pressure of the 7" 26g casing is 7240 psi. Worst case surface pressure would occur with a full column of gas to the reservoir at 7260' TVDSS. Maximum anticipated surface pressure in this case assuming a reservoir pressure of 3448 psi is 2719 psi, well below the internal yield pressure rating of the 7" casing. Logging Pro: I Open Hole Logs: Surface Intermediate Final Cased Hole Logs- None GR/Resistivit7 None LWD GR/Resistivity/Neutron/Density None A gamma ray log will be obtained from surface to TD. Mud Logging is not required. RECEIVED FEB 2 4 1895 i~i~M~.~. 0il & 6as Cons. Commission .Anch0rt Mud Program: ISpecial design considerations INone- LSND freshwater mud Surface Mud Properties: ] Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 50 15 8 10 9 8 to to to to to to to 9.6 90 35 15 30 10 15 Intermediate Mud Properties: N/A I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Production Mud Properties: ] Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 40 10 3 7 8.5 6-8 to to to to to to to 9.7 50 15 10 20 9.5 4-6 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: I KOP: 1800' Maximum Hole Angle' ]67 degrees Close Approach Well:] None There are no close approach wells for drilling MPF-37. Disposal: Cuttings Handling: CC2A Fluid Handling: The other wells on this pad are MPF-25, MPF-13 and MPF-46 (No. Point #1). MPF-46 has had it's annulus arctic packed making it unavailable for injection. Consequently the only annulus available for annular injection will be the 9-5/8" x 7" annulus on MPF-25 and MPF-13. The PEs may be perforating and fracing on MPF-25 or MPF- 13 while MPF-37 is being drilled. Check with the PE supervisor prior to injecting waste fluid down any other annulus to ensure injection will not interfere with their operations. After cementing the 7" casing on this well, MPF-37, and allowing the cement to cure 6 hours the annulus may be used for fluid disposal. Ensure the annulus is freeze protected after injecting any fluids. RECEIVED ~E[B 2. 4 1995 Oil & Gas l:ons. Oommlssion Annular Injection: All cuttings from this well (MPF-37) will require trucking to CC2 for processing and disposal. Fluids may be injected into the 7" x 9-5/8" annulus on MPF- 25 and MPF-13. MPF-37's annulus may be used after allowing the cement on the 7" casing cement job to cure 6 hours following CIP. AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED (BBL) VOL (BBL) Milne Point F-25 0 35,000 1/1/95 -12/31/95 Milne Point F-13 0 35,000 1/1/95 - 12/31/9~ FREEZE PROTECTION: Pay close attention to annulii being used for disposal so to avoid freezing. Sometimes the annulii are kept open by ensuring that an adequate volume (+60 bbls) is injected every 6-12 hours. This practice is more economical than pumping 60 bbls of diesel freeze protection every time the pumps are shut down; however, if this practice is used, it is important that the injection frequency into the annulus be adequate to prevent freeze ups -- the drillers must communicate to each other the last time the annunlus was injected into to avoid freezing. ~ch0ra ;~ MP F-37 Proposed Summary of Operations . 3. 4. 5. . 10. 11. 12. 15. 16. 17. 18. 19. 20. Drill and Set 20" Conductor, Weld an FMC landing ring for the FMC Universal Slitnhole Wellhead on conductor. Prepare location for rig move. MIRU Nabors 2.7__E drilling rig. NU and function test 20" Diverter system. Build Spud Mud. Drill a 12-1/4" surface hole to 6863' md (4524' tvd). (Note: This hole section will be LWD logged with GR/Res). Run and cement 9-5/8" casing. ND 20" Diverter, NU and Test 13-5/8" BOPE. Run Wear Bushing. RIH w/PDC bit and turbine. Test the 9-5/8" casing to 3500 psig. Drill out float equipment and 10 feet of new formation, Perform a LOT. Drill 8-1/2" hole to TD at 13065' MD (7618' TVD). (Note' This hole section will be logged LWD with Triple Combo (GR/Res/Neu/Dens). Pull Wear Bushing, and Change Pipe Rams to 7". Run and Cement 7" casing. The 7" casing will be cemented with a single stage cement job across Kuparuk only. The 7" casing will be displaced with source water. Run and test 7" pack-off to 5000 psi. Change rams to 3-1/2". RIH with 3-1/2" DP and set a retrievable bridge plug @ 3000' MD. POH to 2200' TVD and freeze protect by displacing the 7" casing to diesel. ND BOPE. NU 7-1/16" tubing head adapter, 7-1/16 valve and a tree cap. RDMO Nabors 27E drilling rig to drill MPF-53. Note: This well will be perforated and hydraulically fractured with no rig on the well. The well be cleaned out with a coiled tubing unit and suspended with kill weight brine and a retrievable bridge plug. MIRU Nabors 4ES. NU BOPs and test to 5000 psi. RIH and pull retrievable bridge plug. Run Electric submersible Pump (ESP) on 2-7/8", 6.54/, L-80, EUE 8rd tubing. MU ESP penetrator and land tubing hanger. Set BPV. ND BOP stack and NU tree. Pull BPV and install two check valve. Test tree to 5000 psi. Pull two way check. RDMO with Nabors 4ES. RECEIVED FE~ 2 4 1995 ;~.i~s~ Oil & Gas Cons. Commlsslon Anr~h~r~ ~' MPF-37 WELL 9-5/8" SURFACE CASING CEMENT PROGRAM - HALLIBURTON CASING SIZE: 9-5/8" CIRC. TEMP 80 deg F at 4000' TVDSS. SPACER: 75 bbls fresh water. L,.EAD CEMENT TYPE: Type E Permafrost ADDITIVES: Retarder WEIGHT: 12.0ppg YIELD: 2.17 ft3/sx MIX WATER: 11.63 gal/sk APPROX #SACKS' 1322 THICKENING TIME: Greater than 4 hfs at 50© F. TAIL i~EMENT TYPE; Premium G ADDITIVES: 0.2% CFR-3, 0.2% Halad-344, 2.0% CaC12 WEIGHT: 15.8 ppg APPROX #SACKS' 250 FLUID LOSS: 100-150 cc YIELD:I.15 ft3/sx MIX WATER: 5.0 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. FREE WATER: 0 TOP JOB CEMENT TYPE' Type E Permafrost ADDITIVES: Retarder WEIGHT: 12.0 ppg YIELD: 2.17 cu ft/sk. MIX WATER: 11.63 gal/sk APPROX NO SACKS: 250 CENTRALIZER PLACEMENT: 1. 1 Bowspring centralizer per joint of 9-5/8" casing on the bottom 10 joints above the FS. 2. Place all centralizers in middle of joints using stop collars. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix slurry on the fly -- batch mixing is not necessary. RECEIVED FEB 2 4 ;,~:.~k,q Oil & G~ (l, nnq (l,~rnrni~ion CEMENT VOLUME: 1. The Tail Slurry volume is calculated to cover 623' md above the 9-5/8" Casing Shoe with 30% excess. 2. The Lead Slurry volume is calculated to cover from the top of the Tail Slurry to 1500' md with 30% excess and from 1500' md to surface with 100% excess. 4. 80'md 9-5/8", 40g capacity for float joints. 5. Top Job Cement Volume is 250 sacks. EEB 2 4 i995 Gas Cons. Commission Anchora ¢' MPF-37 7" PRODUCTION CASING CEMENT PROGRAM- HALLIBURTON THIS WILL BE A SINGLE STAGE CEMENT JOB ACROSS THE KUPARUK INTERVAL ONLY: CIRC. TEMP: 140° F BHST 170 deg F at 7260' TVDSS. SPACER: 20 bbls fresh water. 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. CEMENT TYPE: Premium G ADDITIVES' 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344 WEIGHT: 15.8ppg YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk APPROX # SACKS' 202 THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F FLUID LOSS: < 50cc/30 min @ 140° F FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: 1. 7-1/8"" x 8-1/4" Straight Blade Turbulators -- two per joint on the bottom 17 joints of 7" Casing (34 total). This will cover 300' above the LK1. 2. Run one 7-1/8" x 8-1/4" Straight Blade Turbulator inside the 9-5/8"casing shoe. 3. Total 7-1/8 .... x 8-1/4" Straight Blade Turbulators needed is 35. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-10 bpm. Batch mixing is not necessary. CEMENT VOLUME: 1. The cement volume is calculated to cover 1000' md above the top of the Kuparuk Sands with 30% excess over a guage hole. RECEIVED ?EB 2 4 '1995 Aias~, 0il & Gas Cons. Commission Anchora, DRILLING HAZARDS AND RISKS; See the Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for a general recap of the original No Point well (F-46) recently drilled by BPX. There are also several BHLs drilled from L-pad that can give information relavent F-pad drilling. There will be no close approaches while drilling this well. The gravel on F-pad has only recently been laid. Although frozen the gravel has a relatively high moisture content and has not been compacted. This will force Nabors 27E to leave pad in early May so the pad can be compacted and facilities installed. The MPU PE group will be perforating, hydraulic fracturing and cleaning out wells with coiled tubing shortly after the rig drills and completes them. This will make the near rig area congested and as a result hazardous. Ensure personnel use caution moving around adjacent production activities. Check with the PE supervisor prior to injecting fluids down an annulus on any wells that the PE group may be working on. Lost Circulation: No Point 4fl (MPF-46) did not experience any lost circulation while drilling the only well drilled to date on F-pad. The max mud weight reached on that well was 10.3 ppg. They did experience some mud losses while cementing 7" casing. Lost circulation while drilling the production interval has been a problem on 4 different L-pad wells, the closest pad to F-pad, although none of them have BHLs in the F-pad drilling area. The Kuparuk sands and a number of shallower intervals typically are highly fractured. Wells L-07, L-08, L-09 and L-11 lost varying amounts of mud (from 70 to 220 bbls) drilling through or near the top of the Kuparuk sands. Be prepared to treat these losses initially with LCM treatments. Stuck Pipe Potential: While drilling No Point 4fl the 6" BHA was stuck in 8-1/2" hole section for several hours at 6882' ss (13608' MD) before jarring free. They became stuck after tripping back to bottom following a bit trip. Lack of proper hole cleaning parameters appears to have contributed to this problem. Stuck pipe has occurred on 3 L-pad wells at the interface between the Kalubik and D-shale (called the Kuparuk cap rock). These wells and the corresponding depths at which they were stuck were: L-06 @ 6871' ss, L-07 @ 6859' ss, L-Il @ 6835' ss. Kick Tolerance: The surface casing setting depth for this well allows a kick tolerance of 113 bbl influx (Gas) based on a 12.5 ppg LOT at the 9-5/8" casing shoe and a estimated reservoir pressure of 3446 psig (9.1 ppg equivalent MW). Trip Schedules are required for all trips. All trips will be performed with a trip tank or one pit isolated for use as a trip tank. Formation Pressure: The maximum expected pore pressure for this well is 9.1 ppg EMW (3445 psi @ 7280 TVD). There has been no injection in this particular fault block. RECEIVED FEB 2 4 '!995 0[[ .& Gas C,0ns. C0mrnissi0~ ;Anchora :" ~ PL · .~PF ~?F-37 As-SLake .~P?-37 Wo3 :~: ';:24_ :,;l:,~ r ::- -' o oN 0£ 0.BO" 334.00' soo o ART ~ 352_3 1433 9 03' 334.00":398 35 N S-~T ]~ 19~B IG 5~' 334.00'!937 !50 N _ - . 5354 57 33" 334.4l'444635~4 N iii0 5:~,~: 3:I~/59 fi7 33' 334.4l'fi04G 6S54 ~ 333~ F~3 D~ 3~ 12359 35. 33' 335.00'/O4O80/3 N 3854 -:~ge: D /I~659 35 33' 335.00'7285~9N 3937 <Jh3 <~u~< !~/y3 35 33" 335.00'73778~B7 N 3964 .~t ~ !13 ~ 32' 0.30' ti3 S N " ,' ~ 13355 35.32' 335- OS'f~B 8440 N 4035 VERTICAL VIEW SCALE 500 fL. / DIVISION '.'_'VD RE.P: VFELLI[EAD YER'FICAL SECTION REF: WELLHEAD z~'3' :'~ d,.3, 2 !13 MD, IZ3 iVD 1i33 ~ · 3 33" ~ 1133 q3 START OF BUILD ~ 2.00'/100 ft 1398 9.00' 1433 MD SFARf DF BUILD ~ 2.50'/100 Ft llORIZONTAL 'CLEW (TRUE NORTH) SCALE 500 ft. / DIVISION SURVEY REF: V,'ELLIIEAD :--8500 --/500 --5508 " --bO00 ; ] ~500 ;----3060 -~500 ---2000 --1500 --500 ~6 ~ 16.53' ~ 1130 MD []ND DF BUILD I 5OO !931~i79 \ !5.50° ~ I~dB MD START O? CURVE 8 2.50'/100 { . 2333 ~ 21 53' 2 2158 HD ' 4500 4000 3500 3000 2500 2000 1500 1000 500 0 500 1000 t 26.53' 2 2358 ~D 2500-- ~x31 53' ~ ,558 MD ~v36.50' R ~7~8 MD ,%41.b3' ~ 2958 MD 3333-- '~4 00' 8 3458 MD 3395 ~-- --~6/.~3" 8 39~8 HD E~D UF CURVE 3533-- 1480 '822 4445 ~00' ~ 6664 ,D B. Schrader BluFF 450g~ 3953 - ~n D~ .... 9 0/8 ~ 6B63 MD, 45~4 TVD 5OOD~ ~OO3~ 5346 77~3 ~ ~59,00' ~53.00' 6500~ ~43.00' 7333__ 3~'1.00' 134D 8950 ~ 35.00' ~ I~359 MD END DF CURVE 72B5 ~35.00' ~ 12659 MD f~rget D / [KUA3 ZSjD~737Y> 9183 9186 ~35.00' 7618 7618 9355 7 in OD, ~ 13065 MD, MPF-37 Wp3 BOOB : 5:00 ~ 5~0 10'00 15'00 ~000 ~5'00 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 BO00 BSO0 9000 9500 tO000 VERTIC~ SECTIO~ PL~: 334-45 RECEIVED i FEB 2. 4 1995 ~---~-~L--~ ]]ute Plotted : 2/21/95 I 17. Cre6ted By ' ' VS 9354.91 Checked By : ~¢ ~ {, ~j. ill/,. . N/S 843~.~2 N App .... . .~ ~~UU~ 0il & Gas Cons. Commission E/W 4035.09 W Dute : ?~z~ ~ il __~% .... % ............................. ~3..L-. ,_._ il &nohor~. ~ WELL PERMIT CHECKLIST £.~-_C/oo FIELD & POOL GEOL AREA ~70 UNIT#__ PROGRAM: exp [] dev~ redrll [] serv [] ON/OFF SHORE ~/~ ADMINISTRATION 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary.. 6. Well located proper distance from other wells ..... ' 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval.. 13. Can permit be approved before 15-day wait ....... ENGINEERING 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ i~N~?& 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............ ~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved. ~ 22. Adequate wellbore separation proposed .......... ~ N 23. If diverter required, is it adequate .......... ~ N 24. Drilling fluid program schematic & equip list adequate ~ N 25..BOPEs adequate ............ .__ ........ ~ N 26. BOPE press rating adequate; test to ~)6,11~ psig.Q N 27. Choke manifold complies w/API RP-53 ~i.-~"~.... (~) N 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............. Y ~ GEOLOGY 30. 31. 32. 33. \ GEOLOGY: ENGINEERING: ~COMMI SS IO.N: HOW/jo - A:gCORMS~cheklist rev 03/94 Permit can be issued w/o hydrogen sulfide measures .... Y Data presented on potential overpressure zones ..... ~/~N /~/ Seismic analysis 9f shallow gas zones ......... Seabed condition survey (if off-shore) ....... /. Y N Contact name/phone for weekly progress reports . . ;/.. Y N [exploratory only] Comments/Instructions: Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ~ubfile 2 is t.ype: .LIS ·'APE HEADER PRUDHOE BaY UNIT MWD/~ LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MPF-37 500292254800 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 15-0CT-96 MWD RUN 1 AK-MM- 950315 M. HANIK J. GAFFANEY MWD RUN 2 M. HANIK J. GAFFANEY MWD RUN 3 J. STRAHAN J. ROBERTSON 6 13N 10E 1930 2643 47.00 45.50 13.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING ' 12.250 9.625 6621.0 REMARKS: MWD - GR/EWR4/CNP/SLD. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL MPF-37 IS REPRESENTED BY RUNS 1-3. ALL GAMMA RAY DATA ACQUIRED WITH DUAL GAMMA RAY, GEIGER MUELLER TYPE DETECTORS, AND IS DENOTED D R/S RC. RUNS 1 AND 2 ARE DIRECTIONAL WITH GAMMA RAY (SGRC) ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4) RUN 3 IS DIRECTIONAL WITH GAMMA RAY (SGRC), ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4), COMPENSATED NEUTRON POROSITY (CNP/SPSF), AND STABILIZED LITHO DENSITY (SLD/SBDC). GAMMA RAY INTERVAL FROM 6594' TO 6621' LOGGED BEHIND CASING. TWO MEASURED AFTER DRILLING (MAD) PASSES WERE LOGGED TO ACQUIRE ELECTROMAGNETIC WAVE 4-PHASE DATA, DUE TO TOOL FAILURE DURING MWD RUNS 1 AND 3. MAD PASS 1 COVERS THE INTERVAL FROM 5274' TO 5853'. MAD PASS 2 COVERS THE INTERVAL FROM 11471' TO 12848'. MWD GR DATA FOR WELL MPF-37 HAS BEEN DEPTH SHIFTED. THE MAD RESISTIVITY DATA HAS NOT BEEN DEPTH SHIFTED, THEREFORE ONLY THE RAW MAD DATA IS PRESENTED. WELL MPF-37 WAS DRILLED TO TD AT 12915'. ANNIILAR AND CRITICAL VELOCITIES CALC~TED USING THE POWER LAW MODEL. ~E HEADER ~'ILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP NPHI RHOB $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA START DEPTH 154.0 145.0 6623.0 6623.0 UNKNOWN (MEASURED DEPTH) BASELINE DEPTH 12257.5 12259.0 12262.0 12307.0 12309.0 12311.0 12314.0 12321.5 12323.0 12325.0 12328.0 12330.0 12331.5 12335.0 12339.0 12343.5 12350.5 12353.0 12359.5 12362.5 12390.0 12394.5 12395.0 12397.0 12437.5 12452.5 12469.0 12493.5 12495.5 12510.0 12535.5 12538.5 12546.0 12553.5 12555.0 12557.0 12558.0 12559.0 12586.5 12598.0 12607.5 GR 12252.5 12253.5 12256.0 12307.5 12309.0 12313.5 12315.0 12321.0 12322.0 12323.5 12325.5 12327.5 12331.0 12333.0 12340.0 12344.0 12351.0 12353.0 12360.0 12361.5 12387.5 12393.5 12394.0 12396.0 12436.0 12451.5 12467.0 12493.0 12494.0 12508.5 12533.5 12535.5 12544.5 12551.5 12553.5 12556.0 12556.5 12558.0 12584.0 12592.5 12599.5 all bit runs merged. STOP DEPTH 12876.0 12873.0 12857.0 12866.0 EQUIVALENT UNSHIFTED DEPTH /47.0 12743.0 12753.0 12748.0 12769.0 12763.0 ,, 12781.5 12780.0 12791.0 12790.5 12805.5 12802.5 12808.0 12805.0 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 1 202.0 MWD 2 5911.0 MWD 3 6641.0 $ REMARKS: MERGED MAIN PASS. MERGE BASE 5911.0 6641.0 12915.0 CN WN FN COUN STAT /? ?SHIFT. OUT $ : BP EXPLORATION (ALASKA) : MPF-37 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME' Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 2 RPX MWD 68 1 OHMM 3 RPS MWD 68 1 OHMM 4 RPM MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RHOB MWD 68 1 G/C3 7 DRHO MWD 68 1 G/C3 8 PEF MWD 68 1 BN/E 9 NPHI MWD 68 1 PU-S 10 FET MWD 68 1 HR 11 ROP MWD 68 1 FPHR. 4 4 90 310 01 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 350 01 1 4 4 90 356 99 1 4 4 90 358 01 1 4 4 90 890 01 1 4 4 90 180 01 1 4 4 90 810 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 1225 Tape File Start Depth = 12960.000000 ,'ape File End Depth = 100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 308653 datums Tape Subfile: 2 1374 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~e Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 154 . 0 5863 . 0 EWR4 145.0 5276 . 0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUMANGLE: 02 -APR- 95 ISC 1.20 3.93 MEMORY 5911.0 202.0 5911.0 0 .6 64.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ TOOL NUMBER P0352CRG8 P0352CRG8 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 12.250 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SPUD 9.50 47.0 8.5 2600 8.0 1.200 .900 .900 1.800 80.0 109.0 80.0 80.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 1. $ : BP EXPLORATION (ALASKA) : MPF-37 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 2 RPX MWD 68 1 3 RPS MWD 68 1 4 RPM MWD 68 1 5~ RPD MWD 68 1 6 FET MWD 68 1 7 ROP MWD 68 1 AAPI 4 OHMM 4 OHMM 4 OHMM 4 OHMM 4 HR 4 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 373 Tape File Start Depth = 5920.000000 Tape File End Depth = 140.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 92489 datums Tape Subfile: 3 438 records... Minimum record length: Maximum record length: 62 bytes 998 bytes .pe Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 5864.0 EWR4 5856.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMI/MANGLE: STOP DEPTH 6592.0 6584.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ 03-APR-95 ISC 1.20 3.93 MEMORY 6641.0 5911.0 6641.0 0 64.8 66.7 TOOL NUMBER P0351CRG8 P0351CRG8 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 12.250 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MI/D VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SPUD 9.50 44.0 9..5 2500 7.8 1.200 .900 .900 1.800 80.0 109.0 80.0 80.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-3 7 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OH_MM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 52 Tape File Start Depth = 6650.000000 Tape File End Depth = 5850.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 321462 datums Tape Subfile: 4 117 records... Minimum record length: 62 bytes Maximum record length: 998 bytes ope Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 6513.0 EWR4 6485.0 CNP 6621.0 SLD 6621.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12875.0 12848.0 12855.0 12864.0 10-APR-95 ISC 1.20 3.93 MEMORY 12915.0 6641.0 12915.0 0 42.5 67.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD LITHO-DENSITY DGR DUAL GAMMA RAY $ TOOL NUMBER P0358CRNSLDG6 P0358CRNSLDG6 P0358CRNSLDG6 P0358CRNSLDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 6621.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.20 46.0 9.0 1500 5.2 1.090 .541 1.000 1.550 75.0 158.0 75.0 75.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: SANDSTONE 2.65 HOLE CORRECTION (IN) : . 000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: MWD RUN 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-37 : MILNE POINT : NORTH SLOPE : ALASKA .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 RHOB MWD 68 1 G/C3 4 7 DRHO MWD 68 1 G/C3 4 8 PEF MWD 68 1 BN/E 4 9 NPHI MWD 68 1 PU-S 4 10 FET MWD 68 1 HR 4 11 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 890 01 1 4 90 180 01 1 4 90 810 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 614 Tape File Start Depth = 12920.000000 Tape File End Depth = 6480.000000 Tape File Level Spacing = 0.500000 Tape File Depth Unitm = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 247062 datums Tape Subfile: 5 683 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes pe Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 1 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH EWR4 5242.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 6000.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 $ 02-APR-95 ISC 1.20 .3.93 MEMORY 6641.0 5242.0 6000.0 0 .6 64.9 TOOL NLTMBER P0359CRNSLDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 12.250 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MI/D PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SPUD 9.50 47.0 8.5 2600 8.0 1.200 .900 .900 1.800 80.0 109.0 80.0 80.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 CN WN FN COUN STAT MAD PASS 1,~ LOGGED TO FILL IN EWR4 DATA GAP CAUSED BY TOOL FAILURE DURING MWD RUN 1. NO GR DATA AVAILABLE. $ : BP EXPLORATION (ALASKA) : MPF-37 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 RPX MAD 68 1 OHMM 4 2 RPS MAD 68 1 OHMM 4 3 RPM MAD 68 1 OHMM 4 4 RPD MAD 68 1 OHMM 4 5 FET MAD 68 1 HR 4 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 37 Tape File Start Depth = 6010.000000 Tape File End Depth = 5235.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 330769 datums Tape Subfile: 6 103 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~pe Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 3 MAD PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH EWR4 11456.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12871.0 12-APR-95 ISC 1.20 3.93 MEMORY 12915.0 11456.0 12871.0 0 42.5 51.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0359CRNSLDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 6621.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.20 47.0 9.5 1500 4.8 1.090 .520 1.000 1.550 75.0 164.0 75.0 75.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 CN WN FN COUN STAT MAD PkSS 27 LOGGED TO FILL IN EWR4 DATA GAP CAUSED BY TOOL FAILURE DURING MWD RUN 3. NO GR DATA AVAILABLE. $ : BP EXPLORATION (ALASKA) : MPF-37 : MILNE POINT : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 RPX MAD 68 1 OH_MM 4 2 RPS MAD 68 1 OHMM 4 3 RPM MAD 68 1 OHMM 4 4 RPD MAD 68 1 OHMM 4 5 FET MAD 68 1 HR 4 4 95 120 46 4 95 120 46 4 95 120 46 4 95 120 46 4 95 180 01 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 69 Tape File Start Depth = 12880.000000 Tape File End Depth = 11445.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 264289 datums Tape Subfile: 7 135 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes .pe Subfile 8 is type: LIS 96/zo/1s O1 **** REEL TRAILER **** 96/10/16 01 Tape Subfile: 8 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 16 OCT 96 12:14p Elapsed execution time = 9.39 seconds. SYSTEM RETURN CODE = 0 RrCEIVED MPF - 37 /~,:x Z T 1~95 ~,as~a o,, :~ Gas oon~ ¢o~'sJMILNE POINT Anchorag~ ~ Run 1' 15 - April - 1995 Marked Line GR Cased Hole 12250 2813 Tape Subf'ile 2 is type: LIS TAPE HEADER MILNE POINT UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MPF - 37 500292254800 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 26-APR-95 6410.00 R. ECK D. ROBERTSON 6 13N 10E 1930 2643 47.00 45.50 13.00 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 13.325 80.0 3RD STRING 9.625 6621.0 PRODUCTION STRING 7.000 12915.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ EQUIVALENT UNSHIFTED DEPTH REMARKS: GR/CCL Cased Hole. 54.50 40.00 26.00 *** THIS IS THE DEPTH REFERENCE FOR THIS WELL *** ******************** NOTICE ************************ THIS LOG WAS ZEROED AT THE BASE FLANGE WHICH IS USED AS THE REFERENCE POINT. THE BASE FLANGE IS 33.03' BELOW THE R.K.B. · ******************** NOTICE ************************ PASS 1 WAS NOT DEPTH SHIFTED SINCE PASS 1 IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 12250.0 12813.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE PASS NUMBER: BASELINE DEPTH $ REMARKS.' EQUIVALENT UNSHIFTED DEPTH -- PASS 1 (MAIN PASS). NO DEPTH SHIFTS WERE DONE SINCE THIS IS THE DEPTH REFERENCE. CN : BP EXPLORATION WN : MPF - 37 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH GR 68 1 GAPI 2 TENS GR 68 1 LB 4 4 66 264 36 0 4 4 66 264 36 0 * DATA RECORD (TYPE# 0) Total Data Records: 14 1014 BYTES * Tape File Start Depth Tape File End Depth = 12250.000000 = 12815.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3394 datums Tape Subfile: 2 112 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 12255.0 BASELINE DEPTH GRCH 12257.5 12261.5 12269.5 12273.0 12279.5 12282.5 12290.0 12291.5 12293.0 12294.5 12293.5 12295.5 12297.5 12299.5 12303.5 12304.0 12304.5 12305.0 12309.0 12309.0 12312.5 12314.5 12313.0 12315.0 12321.0 12321.5 12332.0 12332.0 12344.5 12345.0 12349.0 12349.5 12362.5 12363.5 12373.0 12373.5 12389.0 12390.0 12389.5 12390.5 12390.5 12391.0 12400.0 12400.5 12401.0 12402.0 12403.5 12404.5 12404.0 12405.5 12408.5 12410.0 12415.0 12415.5 12416.5 12417.0 12417.5 12417.5 12426.5 12426.5 12438.0 12438.0 12447.5 12448.5 12450.5 12451.5 12451.5 12452.0 12452.5 12453.0 12453.5 12453.5 12454.5 12455.0 12464.5 12465.0 STOP DEPTH 12598.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 12482~. 5 12492.0 12493.0 12501.5 12502.5 12503.0 12503.5 12504.0 12504.5 12511.5 12512.5 12513.5 12520.0 12530.5 12531.5 12540.0 12548.0 12549.5 12550.5 12553.0 12553.5 12558.5 12559.0 12562.5 12563.5 12564.0 12575.0 12588.5 12589.0 12597.0 $ REMARKS: 12482.5 12492.0 12494.0 12502.5 12503.0 12504.0 12505.0 12505.5 12506.5 12513.5 12514.0 12515.0 12522.0 12532.5 12533.0 12541.5 12551.0 12552.5 12553.0 12555.5 12556.5 12561.5 12562.5 12566.0 12566.5 12567.0 12578.5 12592.0 12592.5 12600.0 PASS 2 (REPEAT PASS) . TENS SHIFTED WITH GRCH / ? ?MATCH2A. OUT $ CN : BP EXPLORATION WN : MPF - 37 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GRCH GR 68 1 GAPI TENS GR 68 1 LB Size 4 4 API API API API Log Crv Crv Length Typ Typ Cls Mod 4 66 264 36 0 4 66 264 36 0 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 9 Tape File Start Depth = 12250.000000 Tape File End Depth = 12600.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 2104 datums Tape Subfile: 3 110 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12249.0 $ LOG HEADER DATA STOP DEPTH 12887.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWVL SWIVEL GR GAMMA RAY CCL CASING COLLAR LOC. BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 15-APR-95 FSYS REV. J001 VER. 1.1 2014 15-APR-95 12915.0 12814.0 12250.0 12813.0 1800.0 YES TOOL NUMBER 3913NA 1311XA 2321NA .000 12915.0 .0 DIESEL & WATER .00 .0 .0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 0 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS) : 0 TOOL STANDOFF (IN): .0 REMARKS: PASS 1 (MAIN PASS). $ CN : BP EXPLORATION WN : MPF - 37 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CCL GR 68 3 SPD GR 68 4 TTEN GR 68 5 TEN GR 68 1 GAPI 4 1 4 1 F/MN 4 1 LB 4 1 LB 4 4 21 990 60 6 4 26 165 19 6 4 76 115 41 1 4 10 579 41 1 4 10 579 41 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 12249.000000 Tape File End Depth = 12287.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4313 datums Tape Subfile: 4 77 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12250.0 $ LOG HEADER DATA STOP DEPTH 12599.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWVL SWIVEL GR GAMMARAY CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 15-APR- 95 FSYS REV. J001 VER. 1.1 2040 15-APR-95 12915.0 12814.0 12250.0 12813.0 1800.0 YES TOOL NUMBER 3913NA 1311XA 2321NA .000 12915.0 .0 DIESEL & WATER .00 .0 .0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS) : 0 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS) : 0 TOOL STANDOFF (IN): .0 REMARKS: PASS 2 (REPEAT PASS). $ CN : BP EXPLORATION WN : MPF - 37 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CCL GR 68 3 SPD GR 68 4 TTEN GR 68 5 TEN GR 68 1 GAPI 4 1 4 1 F/MN 4 1 LB 4 1 LB 4 4 21 990 60 6 4 26 165 19 6 4 76 115 41 1 4 10 579 41 1 4 10 579 41 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 34 Tape File Start Depth = 12250.000000 Tape File End Depth = 12599.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10487 datums Tape Subfile: 5 107 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS 95/ 4/26 01 **** REEL TRAILER **** 95/ 4/26 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 26 APR 95 3:04p Elapsed execution time = 9.34 seconds. SYSTEM RETURN CODE = 0