Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout195-014
Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
I q ý 0 / Ý File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
o Color items - Pages:
o Grayscale, halftones, pictures, graphs, charts -
Pages:
o Poor Quality Original - Pages:
o Other - Pages:
DIGITAL DATA
o Diskettes, No.
o Other, NolType
OVERSIZED
o Logs of various kinds
o Other
COMMENTS:
ianna Vincent Nathan Lowell
Datef;). GJ /5/ ~
o TO RE-SCAN
Notes:
Re-Scanned by: Beverly Dianna Vincent Nathan Lowell
Date:
151
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well Classification of Service Well
DOil DGas D Suspended Œa Abandoned D Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 195-014 302-185
3. Address 8. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 ~<...._o«__~" 50- 029-21872-01
---
4. Location of well at surface _ _U~:~~T~~ß 9. Unit or Lease Name
407' SNL, 205' EWL, SEC. 19, T11 N, R15E, UM 'J~~ Prudhoe Bay Unit
" . ,-." j\ --'
-;, - - . .r ~ ,{ ~..¡
At top of productive interval f~¿;; _ -~=~,=c<¥,.~~"
2836' NSL, 1481' WEL, SEC. 13, T11 N, R14E, UM 10. Well Number
At total depth ~t'}~
¡;~' -. - - -..., 18-18A
4832' NSL, 1157' WEL, SEC. 13, T11 N, R14E, UM "'>-.....~-~~.-~-- -- ,j
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
RKB = 48.22' ADL 028307
12. Date Spudded 113. Date T.D. Reached 114. Date Comp., Susp., or Aband. 115. Water depth, if offshore 116. No. of Completions
03/05/1995 03/18/1995 8/8/2002 N/A MSL Zero
17. Total Depth (MD+ TVD) 118. Plug Back Depth (MD+ TVD)119. Directional Survey 120. Depth where SSSV set 1 21. Thickness of Permafrost
13062 8672 FT 12249 8677 FT DYes Œa No N/A MD 1900' (Approx.)
22. Type Electric or Other Logs Run
GR, BHCA, CNL
23. CASING. LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 110' 30" ::>150# Poleset
13-3/8" 72# L-80 Surface 3473' 17-1/2" 200 sx CS III. 600 sx 'G'. 200 sx CS II
9-5/8" 48# L-80 Surface 8935' 12-1/4" 750 sx Class 'G'
7" 29# L-80 8605' 9726' 8-1/2" 500 sx Class 'G'
4-1/2" 12.6# L-80 8561' 13058' 6" 462 sx Class 'G'
24. Perforations open to Production (MD+ TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 8581' 8484'
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
12087' Set Whipstock
11510' - 12145' Perf's abandoned with the 18-18B cement
or the 2-7/8" Liner
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE 1 GAS-OIL RATIO
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE
2A. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presen~e of oil, gas or water. Submit corR'EC E J V E D
No core samples were taken. ~ $1 ~ c... '> ~ ~\I'~.~'.J 'Co SEP 2 7 2002
\\\)~~, ~~ ~Q~: u':~. .~. Alaska Oil & Gas Cons. CommisSion
72;" c.J \«~> ~é1V( \.ù (\\ ·~0. ')
Anchorage
FO.fE}tQ~¡¡f!eY1'·\t7\:P1fB~ 2002
~~6'-'~r~a\IÞ¡¡.v . 'å [) l íj
f~)
Lß~
[\ ~
!-, ~
9~· \ L~
Submit In Duplicate
" -
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GaR, and time of each phase.
Zone 1 B
10786'
8620'
RECEIVED
SEP 2 7 2002
Alaska on & Gas Guns. Commisslol1
Anchorage
31. List of Attachments:
Summary of Pre-Rig Work and Daily Drilling Reports
32. I ~erebY certify that the fo~oin: is true and correct to the best of my knowledge
Signed Terrie HUbble/'j" ^ Title Technical Assistant
Date 09·~7.0~
18-18A
Well Number
195-014 302-185
Permit NO.1 A roval No.
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubble, 564-4628
Ted Stagg, 564-4694
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
SCh\i,ªhH=r;, Nn\f n!) ?nnJ'}
~"""
f ~~
'=J
.
.
~
L
08/01/02
08/03/02
08/11/02
Nordic #1
Well:
Field:
API:
18-18B
Prudhoe Bay Unit
50-029-21872-02
Rig Accept:
Rig Spud:
Rig Release:
PRE-RIG WORK
02119/02
DRIFT TBG WI 3.7" CENT, 5' 1-718 STEM & 3.5 CENT TO 9883' WLMD. -- CALIPER TUBING WI KINLEY
CALIPER FROM 9879' WLM TO SURFACE @ 60 FPM. LEFT WELL SHUT IN.
04/03/02
PULL GL VS FROM GLM'S 1 & 2 & DUMMY FROM # 3. SET NEW DGL V'S IN #'S 1 & 2.
04/04/02
MITIA PASSED TO 2500 PSI (WITH S-LlNE). LOAD IA WITH 280 BBLS DIESEL, PUMP UP TO 2500 PSI WITH
11 BBLS DIESEL, LOST 80 PSI IN 15 MIN, 0 PSI 2ND 15 MIN - TEST PASSED, BLED IA TO 1000 PSI, RO lA,
RU TO TBG, PUMP 22 BBLS DIESEL DOWN TBG FOR FREEZE PROTECT, PUMP 108 BBLS DIESEL DOWN
FLOWLINE FOR FREEZE PROTECT.
07/05/02
NIPPLE UP BOPE, PULL BPV. BEGIN TESTING BOPE.
07/06/02
FINISH BOPE TEST, NO FAILURES. KILL WELL WI KCL, CHASE WITH FLO PRO & OBSERVE WELL, STATIC
LOSSES @ 1/2 -1 BBL PER HOUR. MIU DRIFT & GAMMA/CCL BHA & RIH. LOG FROM 12210' CTD TO 11350'.
CIRCULATE WELL TO OBSERVE LOSSES, 1.7 BPM, PUMPED 7BBLS, RETURNS-7 BBLS, NO LOSSES. TIE
LOG INTO SPERRY MWD MAR-85 LOG. 30' SHIFT DOWN. RIH W/3.625" TTWS AND SPERRY MULTI-SHOT.
SET TOP OF W.S. @ 12069' (RA TAG @ 12076'). W.S. IS 13' OAL. POOH. UD BAKER TOOLS & MIU NOZZLE,
RIH & FIP WELL TO 2500' WITH 50/50 METH/WATER. BEGIN RIGGING DOWN UNIT #5 @ 22:50 HRS. DATA
DOWNLOADED FROM SPERRY SUN TOOL INDICATES WHIPSTOCK TRAY ORIENTED FOR A 49R
DEPARTURE FROM CASING, (109 DEGREES OFF FROM INTENDED ORIENTATION). JOB COMPLETED.
SCAN~~ED NOV 0 5 2002
Page 1 _
" _ BP:EXPLORATION
,- - . -
. - -". - -
Op~r~tiº~~i-SlJmmart"~~port
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
18-18
18-18
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 8/1/2002
Rig Release: 8/11/2002
Rig Number. N1
Spud Date: 10/27/1988
End: 8/11/2002
- . - - - ,
--c-.- < .-___,~ _-~-:"---=H
"trOm-t:ctô Hours-¡TáSl< - ÇQde -NPTPhase
Description of Operations
"Dale""
8/1/2002
00:00 - 06:45 6.75 MOB P
06:45 - 07:15 0.50 MOB P
07:15 - 11 :40 4.42 RIGU P
11 :40 - 12:05 0.42 RIGU P
12:05 - 12:35 0.50 RIGU P
12:35 - 13:10 0.58 RIGU P
13:10 - 13:35 0.42 RIGU P
13:35 - 14:20 0.75 RIGU P
14:20 - 15:30 1.17 RIGU P
15:30 - 16:20 0.83 RIGU P
16:20 - 21 :00 4.67 BOPSU P
21:00 - 22:15 1.25 RIGU P
22: 15 - 22:30 0.25 RIGU P
22:30 - 23:30 1.00 RIGU P
23:30 - 00:00 0.50 RIGU P
8/212002 00:00 - 01 :00 1.00 RIGU P
01:00 - 01 :15 0.25 SlWHIP P
01:15 - 02:15 1.00 SlWHIP P
02:15 - 03:45 1.50 SlWHIP P
03:45 - 04:45 1.00 SlWHIP P
04:45 - 05:15 0.50 SlWHIP P
05: 15 - 06:00 0.75 SlWHIP P
06:00 - 06:30 0.50 SlWHIP P
06:30 - 10:00 3.50 SlWHIP P
10:00 - 11 :40 1.67 SlWHIP P
11 :40 - 13:00 1.33 SlWHIP P
(.f{"- r. ràF~¡~r1 l"¡FHE 0 ¡;;;;: 20<"'11,")
r~~t~§"M'tJ¡ç,!L) r\U Uj f.J J",
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
DECOMP
PRE
PRE
PRE
PRE
PRE
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
Moving from OS7-28AL1 to OS 18-18B.
Rig on location, 40' in front of well. Hold PJSM prior to raising
derrick and wind walls.
Raise/scope derrick, raise wind walls. Rig same. Prepare to
move onto well. Bleed WHP from 200 psi to 0 psi. Flowline is
dead.
Safety meeting prior to moving onto well.
Jack up rig, move onto well.
Nipple up BOP's, call for crew to set and berm green tank.
BOP's nippled up at 12:55.
Lunch break.
Pick up injector out of pipe bay.
Berm and spot green tank. Hook up and PT line to flowback
tiger tank.
Stab pipe into injector head.
ACCEPT RIG at 15:30 Hrs, 08/01/2002.
Continue general rig up.
BOP test. Witness waived by State of Alaska - John Crisp.
Send test report to AOGCC.
Fill rig mud pits with 300 bbl, used 9ppg milling fluid.
Change out CT Pack-off.
Rig up OS hyd coil cutter
SAFETY MEETING: Review procedure, hazards and
mitigation for cutting CT.
Cut 350 ft of CT for fatigue life maintenance
Fill CT with milling fluid
Fill coil with milling fluid. Inspect injector chains.
SAFETY MEETING. Review procedure, hazards and
mitigation for MlU BHA.
MlU BKR Milling BHA #1, 3.80" diamond window mill, 3.80
CTC reamer, BOT Navidrill X-treme motor and 2 jts, 2-3/8"
PH6.
RIH with 3.80" milling BHA #1. Tag XN nipple at 8582' CTO,
correct depth to 8569' [-13' CTO].
Mill thru XN Nipple. back ream and ream down. Ream up and
down again. Clean.
RIH and tag top of BKR whipstock at 12,063 ft. Correct to
12,087', ref. POC tie-in log, net correction = [-13'] + 14' = +1 ft
net correction.
Milling 3.80" window out of horizontal 4-1/2" liner. Flagged CT
at 12,087 ft.
2.6/2.6 bpm, 1850/2150 psi, Milled to 12,087.4 ft.
Milling, 2.6 / 2.6 bpm, 1950/2150 psi,
12087.7', Milling window. Pit vol=183 bbls. 2400/2.6/2.6,1700
psi free spin.
12089.2', Continue milling window. Pit vol=179 bbls.
303012.612.6, Free spin up to 1950 psi. Getting significant
motor work. WOB=6000 Ibs.
12089.8', Not getting much ROP. Seeing more motor work
than usual, but not with corrispondingly more WOB.
CTP==31 00 psi, WOB=4500 Ibs. 1200 Ibs motor work! Usually
only get 300-400 with this Hughes mill. Make PU, then resume
milling.
Printed: 8112/2002 2:51 :41 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
81212002
13:00 -13:10
13:10 - 15:00
15:00 -16:00
16:00 - 16:45
16:45 - 19:00
19:00 - 21 :00
21 :00 - 23:00
23:00 - 00:00
8/3/2002
00:00 - 02:00
02:00 - 03:30
03:30 - 04:00
04:00 - 04:20
04:20 - 04:45
04:45 - 06:35
06:35 - 08:15
08:15 - 09:00
SCAf'\JNEC) NOV 0 5 2002
BP EXPLORATION ..
Operªtions"~ul11rnélry>Report· .
Page ~
18-18
18-18
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 8/1/2002
Rig Release: 8/11/2002
Rig Number: N1
Spud Date: 10/27/1988
End: 8/11/2002
> >
Hours.ra~ ··Code NPT·Phase
Description of Operations
0.17 STWHIP P
WEXIT 12090.0', Mushy stall at 3300 psi, and very little ROP for last 3
hours. Pickup, Free spin=1890 psi. Retag and attempt to
resume milling. Not able to, and got a very mushy stall right off
the bat. Need to POOH to inspect BHA. Suspect bad motor or
washout in BHA. Stop and paint flag at 12,050', bit depth,
(11965', EOP).
DFAL WEXIT POOH to investigate possible motor problem or BHA washout.
1.83 STWHIP N
1.00 STWHIP N
DFAL WEXIT Tag up at surface. Stand back injector. Trouble shoot BHA.
Found Hughes mill very under gauge at 3.74". Most of gauge
set diamonds missing. Damage to mill does not look like wear,
looks like it was peened by vibration. String mill also showing
wear, but was guaged at 3.80". No leaks or washouts in BHA.
Motor appears tight. Found damage to coil for 8' above CTC.
Damage to coil was not leaking, but appears consistent with
vibration up against perforations. CTC missing 3 set screws.
DFAL WEXIT Cut 8.5' of coil. Attach new CTC. Pt to 3500 psi, Pull tested to
30klbs. MU to top of BHA.
DFAL WEXIT RIH with Window milling BHA #2. Tag bottom at 12,070 ft.
Correct to 12,089 ft.
WEXIT Milling window. 2.5 / 2.5 bpm, 1780 /2500 psi, Milled to
12091 ft.
WEXIT Milling window. 2.5 / 2.5 bpm, 1800 /2500 psi, Milled to
12093 ft.
WEXIT Milling window. 2.5/2,5 bpm, 2000/2700 psi, Milled to
12094 ft.
WEXIT Mill window. 2.5 / 2.5 bpm, 2200/2700 psi, 2500# WOB,
Milled to 12,095.8 ft.
Added 4 sx of Biozan over last 4 hrs to increase viscosity. Full
returns.
WEXIT Back ream to check free spin pressure and Own Wt. Had full
stall at 12,087' [top of window]. Pick up above whipstock, ease
in hole and stall at 12,089 ft. Pick up again, RIH and stall at
12,089 ft. Ream down several times and stall at same depth.
Had 12K overpull on one stall. Appears first stall on backream
damaged the top of the window. Whipstock is set in
perforations, so condition of exit area not known.
WEXIT Ream down slow at 12,089 ft. Mill thru restriction at top of
window. Motor work down to 12,091 ft. Ream in hole easily,
back to correct TO of 12,096 ft.
WEXIT Mill window, 2.6/2.6 bpm, 2500/2800 psi, Normal milling
again. Milled out liner at 12,097 ft. Window top at 12,088',
Window bottom at 12,097 ft.
WEXIT Mill formation at 40 FPH with diamond mill. Mill formation to
12,107 ft.
WEXIT Ream window while swapping well over to reconditioned
FloPro. Ream up and down 3 times. Slight motor work at top
of window. Stop Pump, RIH to TO, Pull up above window.
Clean window. Ream to TD one more time.
WEXIT POOH with BHA #2. Window milling completed.
WEXIT Tag up with BHA #2, stand back injector. Lay down BHA. Mill
in perfect shape. DSM gauges at 3.80 pass, 3.79" no go.
String reamer gauged at 3.80". No marks on coil above coil
0.75 STWHIP N
2.25 STWHIP N
2.00 STWHIP P
2.00 STWHIP P
1.00 STWHIP P
2.00 STWHIP P
1.50 STWHIP P
0.50 STWHIP P
0.33 STWHIP P
0.42 STWHIP P
1.83 STWHIP P
1.67 STWHIP P
0.75 STWHIP P
Printed: 811212002 2:51:41 PM
Page 3_
BP.E)(Pt.ORATION
., - - "-- ---.
--- - "-- -. - .-
"- "- - - -- - -. - _. -
,. <º~~t'!iPß'·<ª~fflmary~!pp.rt
- - . -- --
~- - '--
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
18-18
18-18
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
.- -. - -.
-Fr6rr{;TP" ';H()uÍ'Š~task; _Cöa~cNPT', ~~Phåse
Start: 8/1/2002
Rig Release: 8/11/2002
Rig Number: N1
Spud Date: 10/27/1988
End: 8/11/2002
. Description of Operations
8/3/2002 08:15 - 09:00 0.75 SlWHIP P WEXIT connecter as in previous run.
09:00 - 10:00 1.00 SlWHIP P WEXIT Make up first drilling BHA, BHA #3. 1.79 deg mud motor, M09
bit, Sperry MWD and orienter.
10:00 - 12:35 2.58 SlWHIP P WEXIT RIH with BHA #3, Shallow hole test at 400', passed ok.
Orienter tested at 5500', passed ok. Tried to run thru window
dry and tag TD prior to tie in to confirm depth. (Depth slippage
on encoder while RIH). Could not get thru window. Tagged up
2 times at 12085'. PU and make tie in pass.
12:35 - 13:10 0.58 SlWHIP P WEXIT log tie in pass over gamma ray spike at 11971'. Make +16'
correction.
13:10 -13:50 0.67 SlWHIP P WEXIT Orient to 45L, RIH with pumps down. Slipped thru window
easily. Tag TD at 12100', Kick pumps on and found TF=60R.
Orient around to 45L to begin drilling'
Tag up at 12100', begin drilling. Free spin 3300 psi at 2~
Pit vol=283 bbls. Drilling ahead at 68L tool face at 3500 ps' t
60 fph.
14:35 - 15:00 0.42 DRill P PROD1 Orient around to 90L. /'
15:00 - 15:30 0.50 DRILL P PROD1 Resume drilling. 2.6/2.513600 psi, Pit vOlume=~s.
TF=46L. Inc 85 deg? We have been holding' side tool
face's, and are below 90 deg. Need to buil angle stay away
from Kavik shale.
15:30 - 16:15 0.75 DRILL N DFAL PROD1 Orient to 0 deg, straight up. Inc no\,,// own to 82 deg!.
Something isn't right! BHA po~ibfý in a bind coming out
window, or soft sand is not gjv'ng us the build we need. Kavik
shale at 8645' on the D~18 mother wellbore. Current TVD
depth at bit 8641'. w~ eed a bigger motor to avoid the Kavik.
16:15 - 16:50 0.58 DRILL N DFAL PROD1 12179', Pull up = 0 more vertical section of hole to check
accuracy Of~' ation tool vs old survey at 9300'.
16:50 - 17:30 0.67 DRILL N DFAL PROD1 Re~~ y at 9300', getting high G totals. Have to mess
about a aren't able to get any surveys with good G totals.
17:30 - 18:30 1.00 DRilL N DFAL PROD1 Con' ue POH. Finally managed to get good G totals at 5500'.
IS tooIINC=7.85 deg. Original well=7.65 deg. Well within
~ tolerance no problem with MWD tool.
18:30 - 18:45 0.25 DRILL N DFAL PRO SAFETY MEETING. Review procedure, hazards and
mitigation for BHA check.
18:45 - 19:45 1.00 DRILL N DFAL ROD1 Check scribe orientation. Found 39 deg offset, it was
measured at 106 deg when RIH. Check connections and
found under torqed connection above bleed off sub, which
caused shift in scribe orientation. Tighten connection, Adjust
motor to 2.39 deg and measure new scribe orientation.
19:45 - 22:00 DFAL PROD1 RIH with MWD BHA #4, 2.39 deg motor and re-run M09 Bit
#4. Ran thru window with no wt. loss. Tag TD at 12,173 ft.
Added 5 ft to CTD, to correct to Tied-in TO of 12,178 ft.
22:00 - 22:30 N DFAL PROD1 Orient TF to 30L.
22:30 - 00:00 N DFAL PROD1 Drilling, 2.6/2.6 bpm, 3480 / psi, TF = 30L, Inet = 80.3 deg
at 12,175', building incl from this depth. Added 4 PPB
Klaygard to FloPro. ROP = 20 FPH.
Drilled to 12,214 ft. Geologist said sample at 12,200 ft was
// transitional Kavik siltstone. 86 deg. incl at 12,200'. Max GR =
160 API.
8/412002 60:00 - 01 :30 1.50 DRILL N DFAL PROD1 Drilling, 2.6/2.6 bpm, 3300 /3800 psi, TF = 5L, Incl = 88 deg.
/ / Drilled to 12,230'.
// / 01:30 - 02:20 0.83 DRILL N DFAl PROD1 Orient TF to 9OL.
/
/ /
// Printed: 811212002 2:51:41 PM
SCANNED NOV o ~ 20rn
; IŸ uL
)
.J
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
18-18
18-18
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 8/1/2002
Rig Release: 8/11/2002
Rig Number: N1
Spud Date: 10/27/1988
End: 8/11/2002
-- .
..-,' .. -.-- - :_.- ...- --,
.. -'.-'- ..... .. .
. ,.. .--- '." -. ..
-~ptiQnºf Operations
- -'::õ-_;::",).~-',,-~-
_ ~ _,0_ ".o:,~_~'';:~: J,,"_ -:0' -
--;--"::~'=-j_::~~;::;'~~' -:-;,--;,---,-
~--'-,- ~ -'-'::"'-, -'----. ~ .;.-:".
{M-Rt~ ;~~R~c?;D1?;~'<
:_3'<:'-'~J_--':""~!~,' ~-~,:'':: ~.-'--~ ; ~-~
PROD1 Drill 2.6/3200 to 13183'. Stacie PU.
DPRB PROD1 Can't get back to bottom (poor slide). Mud solids> 1.25%. Try
to work down wlo pumps. Loading new mud at plant. Work to
13145' and struggle getting past this depth. No motor work but
maybe the shale here is preventing further progresss. Work to
bottom
Drill with negative weight to 13212'. 20k overpulls off bottom.
Short 100' wiper. Didn't help. Swap to new 9.2 mud.
Huge difference witth new mud. 14k RIH wt. ROP 100 FPH.
Drill to 13300'.
Wiper to 8500'. Shales in pretty good shape PUH- slight
packoff at 12610', MW at 12494' and 12320' and 12180'. RIH
had to orient to get past 12350' shale (we were about 180 deg
out from where it was drilled), but got thru 12650' shale with full
pumps and no set downs (but quite a bit of motor work).
Overall, much improved hole conditions with new 9.2 ppg mud
in ground.
PROD1 DriIl2.5/3300/90R to 13458'. Stacking, PU, can't get back to
bottom
PROD1 Wiper to window, 10k overpulls 12650-690' and minor motor
work. RBIH and set down at 12320'. RIH to 12600' and orient
to drilled TF. Set down and 12657'. Ream wI motor work to
12695'. RIH to TD at 13456'
Drill 2.613340/7 4R to temporary TD at 13601'
Wiper to window, 15k overpulls at 12720' and 12695'
Log tie-in to RA from 12130'. Add 1.0'
RBIH clean to setdown at 12660'. Spud and ream at drilled TF.
Continue RIH
Continue wiper to TD. Tag at 13600' CTD (official TD)
Wiper to window, minor overpulls thru 12650-90'
POOH for liner. Backream 60'/min to 8500'. Flag at 10300'
EOP.
LD drilling BHA
Safety mtg re: liner
RU to run liner
MU 45 jts 2-7/8" 6.16# L-80 STL liner wI float equipment and
10'pup
MU 51 jts of 3-3/16" 6.2# L-80 TCllliner.
MU CTLRT. PU inj.
Load and pump dart thru coil 3.1/2400. Bump at 54.4 bbls. No
other debris in catcher.
Rehead. Pull test failed. Rehead. Pull test pressure test.
Stab coil.
RIH with liner at min rate. At window 35k118k. Smooth thru
12350' shale. Ratty in shale starting 12,640'. Set down hard at
12920'. Repeat 5 times. Bounced past at 100 FPM. Continue
to bottom with numerous set downs (probably the turbos).
Check flag on the fly - within a few ft. Work to TD 13594'
CTM. Repeat tags same depth. 45k up/5k down dry. Check
circulation: no losses at 1.0 BPM; 1850 psi.
PROD1 Drop 5/8" ball. Circulate ball 2.0/2450 with full returns, stacking
negative weight. At 35 bbls slow to 0.6/1500. Never saw ball
land. Try small surges. Pump a total of 67 bbls.
8/7/2002
09:00 - 09:30
09:30 - 10:15
0.50 DRILL P
0.75 DRILL N
10:15 - 10:50 0.58 DRILL P PROD1
10:50 - 11 :45 0.92 DRILL P PROD1
11 :45 - 13:00 1.25 DRILL P PROD1
13:00 - 16:15 3.25 DRILL P PROD1
16:15 - 18:45
2.50 DRILL P
18:45 - 20:30
1.75 DRILL P
20:30 - 22:45 2.25 DRILL P PROD1
22:45 - 23:20 0.58 DRILL P PROD1
23:20 - 23:35 0.25 DRILL P PROD1
23:35 - 00:00 0.42 DRILL P PROD1
8/8/2002 00:00 - 00:20 0.33 DRILL P PROD1
00:20 - 01 :05 0.75 DRILL P PROD1
01 :05 - 03:20 2.25 DRILL P PROD1
03:20 - 04:00 0.67 DRILL P PROD1
04:00 - 04:15 0.25 CASE P COMP
04:15 - 04:45 0.50 CASE P COMP
04:45 - 06:45 2.00 CASE P COMP
06:45 - 09:00 2.25 CASE P COMP
09:00 - 09:45 0.75 CASE P COMP
09:45 - 10:30 0.75 CASE P COMP
10:30 -11:15 0.75 CASE P COMP
11 :15 - 13:45 2.50 CASE P COMP
13:45 - 15:30
1.75 CASE P
SCt~Nr~ED NOV 0 5 2002
Printed: 8/1212002 2:51:41 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
8/8/2002
15:30 -18:15
18:15 - 19:40
19:40 - 20:00
20:00 - 20:45
20:45 - 22:25
8/9/2002
22:25 - 22:45
22:45 - 00:00
00:00 - 01 :30
01 :30 - 08:00
08:00 - 12:00
12:00 - 12:30
12:30 - 13:00
13:00 - 15:00
15:00 - 15:45
15:45 - 17:15
17:15 -18:30
18:30 - 20:40
20:40 - 21 :40
21:40 - 23:15
23:15 - 23:25
23:25 - 00:00
8/10/2002
00:00 - 01 :00
01 :00 - 01 :20
01 :20 - 01 :30
01 :30 - 02:30
02:30 - 04:00
SC¡W~NED NOV 0 5 2002
18-18
18-18
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
2.75 CASE N
DPRB COMP
1.42 CASE P
COMP
0.33 CEMT P
COMP
0.75 CEMT P
COMP
1.67 CASE P
COMP
0.33 CASE P
1.25 BOPSU P
1.50 BOPSU P
6.50 BOPSU N
COMP
COMP
COMP
SFAL COMP
4.00 BOPSU P
0.50 EVAL P
0.50 EVAL P
2.00 EVAL P
0.75 EVAL P
1.50 EVAL P
1.25 EVAL P
COMP
COMP
COMP
COMP
COMP
COMP
COMP
2.17 EVAL P
1.00 EVAL P
COMP
COMP
1.58 EVAL P
0.17 EVAL P
0.58 EVAL P
COMP
COMP
COMP
1.00 CASE P
COMP
0.33 PERF P
0.17 PERF P
1.00 PERF P
1.50 PERF P
COMP
COMP
COMP
COMP
Start: 8/1/2002
Rig Release: 8/11/2002
Rig Number: N 1
Spud Date: 10/27/1988
End: 8/11/2002
--' :," '- ,- - - .
()e$CrjpÌionof Operations
Mix two buckets flo-vis in 15 bbls mud. Pump pill 1.0 BPM.
Ball did not land on seat after pumping 70 bbls more. PUH to
41 k to position ball drop. Weight suggests liner still there.
Drop a phenolic (sp?) ball. Pump downhole at 1.0/1900; full
returns. Land at 52.7 bbls. Shear ball seat at 3900 psi. PUH
to verify free from liner. Broke over at 24k - free.
Displace well to 2% KCL water. 2.5/2.42400
Safety mtg re: cementing. Mix cement
PT DS @ 4000 psi. Load CT wI 22.0 bbls 15.8 ppg 'G' cement
wI latex 1.8/1300
Load wiper dart. Found 5/8" steel ball in Whitey port of ball
drop cap. Verify dart gone. Displace w/2% KCI water 2.0/1.8
1000. Red rate to 1.5/820 prior to latchup. Latched at calc
displ and sheared at 3100 psi. Incr rate to 2.6/2.4 2400-3600
(presS varied due to sli packing off as shown on the out MM).
Red rate 2 bbls prior to seating
Liner wiper seated at calc displ. Hold 1400 psi. Unsting at
29k, floats held. Out MM showed 22 bbls past shoe (full
returns). PUH, start pump. Jet TOL. POOH jetting 3.2/2020.
Dump 25 bbls of cement contaminated fluid (extra 2 bbls cmt,
above TOL). Jet BOP stack
LD CTLRT
Weekly BOPE test. Witness waived by AOGCC
Continue weekly BOPE test
Replace 3" manual chokeline valve. Stem stripped (always has
been difficult to open/close). Try to rebuild. Corrosion in body
pushing seats into paddle. Unable to rebuild. Grab new valve
from Nordic #2. Install.
Finish BOP test.
Safety meeting: CNL tools - handling.
MU CNL carrier on motor and mill.
MU 100 jts of CSH.
MU MHA. PU inj. Stab pipe.
RIH to 9600'.
Log down 60 FPM from 9600' at 0.5 BPM. Tag PBTD 13557'
CTM. Bring pumps to 1.5 BPM. Retag. Stacking off bottom.
Retag dry at 13557'. Try with pumps again at 1.0 BPM. RIH
and tag 13557'. No stall or motor work.
UCA at 1900psi, 20hrs.
Log up at 30 FPM, laying in 11 bbls 160k LSRV perf pill.
POOH from 9600'. DS mechanics make adjustments to
injector
Stand back CSH workstring
Safety mtg re: source
Remove source. LD CNL in carrier. LD motor and mill. No
wear on mill. Motor tumed okay
Pressure test wellbore to 2000 psi. Bled to 600 psi in 15
minutes. IA incr 10 psi
Load perf guns in pipeshed. Have CNL data
RU to run perf guns
Safety mtg re: perf guns
MU 33 perf guns and blanks
MU 38 stds CSH and one single
Printed: 8112/2002 2:51:41 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
18-18
18-18
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start 8/1/2002
Rig Release: 8/11/2002
Rig Number. N1
Spud Date: 10/27/1988
End: 8/11/2002
~-;:~<} -~ ..-
8/10/2002 04:00 - 05:45
05:45 - 06:20
06:20 - 08:30
08:30 - 08:45
08:45 -10:15
10:15 - 10:45
10:45 -13:15
13:15 -13:45
13:45 -14:15
14:15 -16:00
16:00 - 17:45
17:45 - 18:30
18:30 -19:50
19:50 - 20:15
20:15 - 21:15
21:15 - 21:35
21 :35 - 22:30
22:30 - 00:00
8/11/2002 00:00 - 01 :30
01:30 - 04:30
I
04:30 - 05:45
~r'í\ knr- "'1=-
~~YMHV8\!k::.b i\ir"'ì\8 n Þ "'Î;
" ¡.I J H ~ t-~ - ¡ nIP',
1.75 PERF P
0.58 PERF P
2.17 PERF P
0.25 PERF P
1.50 PERF P
0.50 PERF P
2.50 PERF P
0.50 RUNCO
0.50 RUNCO
1.75 RUNCO
1.75 RUNCO
0.75 RUNCO
1.33 RUNCO
0.42 RUNCO
1.00 PERF P
0.33 CASE P
0.92 CASE P
1.50 RIGD P
1.50 RIGD P
3.00 RIGD P
1.25 RIGD P
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
POST
:~:-;@ésériPtic)nofOþerati.ÒO$. ...... .
RIH wI CT. Tag at 13556.7' and corr to 13566'. Pump 7 bbls
fresh hi vis Flo Pro mud. PUH to perf depth 38.4k
Load 5/8" steel ball. Displace with 5 bbls mud and chase with
2% KC11.8I2550
Ball seated 5 bbls early. Guns fired at 3000 psi. PUH 43k.
POOH. Lost about 8 bbls while POOH.
Perforated wI SWS 2" 2006 PJ HMX guns @ 60 deg phz
12850-13100' w/4 spf
13150-13300' w/6 spf
13370-13540' w/6 spf
Safety meeting.
LD CSH. No downhole losses while LD pipe.
Safety meeting.
LD guns. All shots fired. Load out.
Safety meeting.
MU KB liner top packer and seal unit with mule shoe guide.
RIH
10400' wt check 35k127k. RIH at 0.4 BPM; 70 psi CTP. At
10504' saw P-increase (seals into deployment sleeve). SD
pump. Continue RIH. Locate at 10508'. Stack 10k down to
10510'. PUH to breakover 10505.8', then another 1.5'. Depth
here is 10504.3' (10409' mechanical). PUH to ball drop. Drop
5/8" phenolic ball. Pump 1.9/660. Land at 50.6 bbls. Bleed
off. RIH. Tag 10502' - tagging top of deployment sleeve.
Repeat. Unable to get in. Try faster running speed. Won't
slide in. Try putting 500 psi on coil to change insertion angle.
No go. PUH 400'. RIH again. Can't get the stinger in. Line-up
and pump down backside 0.5 BPM; 1500 psi WHP. Try to sting
in. Nothing. Dump pressure with muleshoe just on top of liner
top packer. Nothing. Pump and dump again while taking run
atit. Got it in!!! Tag 10510'.
PUH until packer starts moving, then another 1.5'. Depth here
10503.8'. Repeat tag and PU to same depth. Pressure coil to
2500 psi. Pull to 1 k over. Slack off 10k. No movement.
Packer set with top at 10501'. Bleed coil pressure. Pressure
backside to 2000 psi to test packer. 0 psi bleedoff in 15
minutes. Good test.
Pressure up coil to release running tool. Shear at 3900 psi.
POOH. Lost 10 bbls while POOH
LD LPT running BHA. All seals good
RIH w/ 12 stds CSH. POOH LDDP
MU nozzle BHA
RIH wI CT to 2000'. FP wellbore with 25 bbls MeOH. POOH.
SI masterlswab
MIRU DS N2. PT 4000. Blow down CT wI N2. Blow down
hardliine to flowback tank. Vac pits and green tank
ND BOPE and hang off. NU tree cap and PT. SI SSV and
SSSV
Rig released at 0130 hrs 8/11/02.
Unstab CT and pull to reel and secure. Remove gooseneck.
Set injector in pipe bay.
DSM RD hardline and move out tanks
Jack up rig and prep to move off well. Move rig to entrance
Printed: 8/1212002 2:51:41 PM
"'" \J , ,
- ". .
-::JF" (s!IL
Ðf?'S £/1 r
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: 1m Abandon 0 Suspend B Plugging 0 Time Extension 0 Perforate
o Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance IBI Other
o Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate Plug Back for Sidetrack
3. Address
P .0. Box 1 96612, Anchorage, Alaska 99519-6612
2. Name of Operator
BP Exploration (Alaska) Inc.
5. Type of well:
IBI Development
o Exploratory
o Stratigraphic
o Service
6. Datum Elevation (DF or KB)
RKB = 48.22'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number .;/
18-18A
9. Permit Number
195-014
10. API Number
50- 029-21872-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
4. Location of well at surface
4071 SNL, 2051 EWL, SEC. 19, T11 N, R15E, UM
At top of productive interval
28361 NSL, 14811 WEL, SEC. 13, T11 N, R14E, UM
At effective depth
41701 NSL, 16291WEL, SEC. 13, T11N, R14E, UM
At total depth
48321 NSL, 11571 WEL, SEC. 13, T11 N, R14E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Liner
13062 feet Plugs (measured) Set CIBP at 122491 (04/01)
8672 feet
12249 feet Junk (measured)
8677 feet
Length Size Cemented MD TVD
1101 2011 2150# Poleset 1101 1101
34731 13-3/811 200 sx CS III, 600 sx 'G\ 200 sx CS II 3473' 3473'
89351 9-5/811 750 sx Class IGI 8935' 8256'
11211 711 500 sx Class IG1 86051 - 9726' 8089' - 85221
44971 4-1/2" 462 sx Class IGI 85611 - 13058' 80661 - 86721
RECEIVED
115101 - 116851, 117501 - 119151, 119601 - 121451
Isolated Below CI BP: 123801 - 124901, 12550' - 12790', 129301 - 12970'
true vertical 86701 - 86721, 86741 - 86761, 86761 - 86781 , J! 1\1 u1 1 ()0I12· ;
~-U1 t L \j"",
Isolated Below CISP: 86761 - 86721, 8670' - 86701, 86701 - 8671'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 85811 ,(.\!as~(a U~" t:~ {jas Gons~ CommlsS;
Anchorage
Packers and SSSV (type and measured depth) 9-5/811 x 4-1/2" TIW IHBSPI packer at 84841; 4-1/211 Camco ITRDP-4AI SSSV Nipple at
22181
Perforation depth: measured
13. Attachments 1m Description Summary of Proposal
14. Estimated date for commencing operatiqn
July 15,2002 ,f'
16. If proposal was verbaJly approved
Name of approver Date Approved
Contact Engineer Name/Number: Ted Stagg, 564-4694
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Ted Stagg Title CT Drilling Engineer
o Detailed Operations Program 0 BOP Sketch
15. Status of well classifications as:
it Oil 0 Gas 0 Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
Conditions of Approval: Notify Commission so representative may witness
Plug integrity _ BOP Test L. Location clearance _ Approval No. ...30 -I?J 5
Mechanicallnteg':!.ty Test --;--- Subsequent form_9f'sl{Jï¡ii!ß! Octe-v s; dR tiHIL C-t"wl.f" t 1
'1f~+- Bo,'¡:- iv ~SCJO P'¡ , '. .
A roved b order of the Commission , ~ f~~rY¡f'efhsh Taylor Commissioner Date
Form 10-403 Rev. 06/15/88SCANNEDJUN 2 1 \ l Submit I Tri licate
o··········~.·.······',·:·::···..'.,.,.,...,.,......:,.......,......:.......,.'.'....,:.:..,:..,......-:,.:,.....,.:...:....,....,....:.......:.:.;-...',.',..".,..."...:.'....,..,:...'..........,..............-...,...·,··.:,-..·'·'.-.······b
,/y:,.. .,',:/, P
: ~<~ _õ,':-:·:. . _" .;.,";::'" _~
To: Tom Maunder
Sr. Petroleum Engineer
Alaska Oil & Gas ConseNation Commission
From: Ted Stagg
CTD Engineer
Date: June 6, 2002
Re: CTD Sidetrack of well 18-18a
/
OS 18-18a is scheduled for a through tubing sidetrack with the Nordic 1 coil drilling rig. The sidetrack, 18..18b,
will kick off from a window milled in Zone 1 of the Ivishak. The 18-18b target is Zone 1 A/1 B. The following
describes work planned to prep for sidetracking and is submitted as an attachment to Form 1 0-403. A schematic
diagram of the proposed sidetrack is attached for reference.
1. MIT has been successfully performed on the OA. (2/3/02)
2. Kinley Caliper has been run over the tubing. (2/19/02)
3. All GLM's have been dummied off and MIT-IA successful to 2500 psi. (4/3-4/02)
4. Service coil will kill the well with drilling fluid (8.6 ppg Flo-Pro) and set a mechanical whipstock at
approx. 12,100' MD (8634ss). If the existing perfs at and above the whipstock depth do not ta~'
drilling fluid under circulating conditions then the sidetrack will be drilled with these perfs open. . If the
perfs do take fluid during the whipstock setting operation then service coil will squeeze approx. 25 ~
bbls 15.8 ppg cement to shut off these perfs. These exis, perfs will be covered in any event by
the cemented liner planned for the sidetrack completion.
5. Window will be milled with drilling coil.
Steps 4 will be performed between July 15 and Aug. 1, 2002. Drilling coil is scheduled to mill the window and
drill the sidetrack on August 10, 2002.
J/~ 'i~~
Ted Stagg
CTD Drilling Engineer
cc: Well File
Terrie Hubble
\ 1~~1.
D j~~ 't
SC~~~t;;.
...-~.....
TREE = FMCGe-J 4
WB.LI-EAD = CWV 18-18A
ACTUATOR = BAKER C SAÆTYNOTES: 70° @ 9294'
KB. ELEV = 47 AND 90° @ 11559'
SF. ELBt =
KOP= 55941
Max A ogle = 92 @ 124161
Datum MD = 12404' I 2218' 4-1/2' CA MOO TR[F-4A SSSV NIP, D = 3.812"
I
DatumTVD = 8800' SS .
GAS LIFT MANDRELS
13-318" CSG. 72#, L-80, D = 12.347' 34 73' ¡-J ~ ST MD lVD ŒV TYPE VLV LA TCH PORT CV\ 1£
1 3278 3278 0 TGPD DMY RK 0 04104102
U 2 5783 5776 15 TGPD DMY RK 0 04104102
3 8413 7983 55 TGPD OMY RK 0 04104102
Minimum ID = 3.725" @ 8569' I
4-1/2" HES XN NO-GO NIPPLE 8 !rç:? ----1 8484' 9-518" x 4-1/2" TJW HBBP PKR I
~ I
11 . I 8569' 4-1 f2n rES XN NO-GO NIP. ID = 3.725" I
.~ I
I TOPOF 4-1/2" LNR 8561' I N
V ill . 8581' 4-11211 TUBING TAIL WLEG I
14-1/2"TBG, 12.6#, L-80, 0.0152 bpf, 10 = 3.958" 8581' J H ELM) IT NJT LOGGBJ I
TOP OF 7'1 LNR 8605' I I
I Ii
I 9-5/8" CSG, 47#, L-80. 10 = 8.681" 8934' ~ ~
;-: ~
I 7" LNR 29#, L-80, 0.0371 bpf. ID = 6.184" H 9726' I ~ 7" SIDETRA CK WINOOW
~ ~
}j ~ @ 9726' - 9776'
)( ,
ÆRFORA TlON SlJv1MARY ~ ~
REF LOG: BI-CS ON 10/18/86 ~~ x\
)()(~
ANGLE AT TOP PERF: 87° @ 11510' ~y~~
Note: Refer to Production œ for historical perf data )( ~~~
)( ~x ~
SIZE SA= INTERV A L Opn/Sqz DATE It ~)( X \\
2-1 fl." 4 11510-11685 0 03/21/95
x x I 12249' BKR CIBP - 0410 6/01 I
2-1 fl." 4 11750-11915 0 03/21/95
...- I
2-1 f2" 4 11960-12145 0 03/21/95 ---
....
""'- -¡-. ~
2-1 f2" 4 12380-12490 0 03/21/95
2-1 f2H 4 12550-12790 0 03/21/95 x 'I x )(
2-1/2" 4 12930-12970 0 03/21/95 \
I A3lD 12974' I
I
I 4-1/2f1 LNR, 12.6#, L-80. 0.0152 bpf, 10 = 3.958" 13058 ' I
I
[}\ 1£ RBI BY COMrvENTS DATE REV BY COMrvENTS PRlJDI-ÐE BAY LNrT
1986 ORlGINt\L COMR..E1l0N 04/04/02 RL/KA K O\t1Y OFF Gl V s WELL: 18-18A
03118195 SIŒTRAO< COf'vPLErION PffiMT fo.D: 195-0140
01/09/00 SIS-Is I CONVERTED TO CANV AS AA fo.D: 50-029-21872-01
02122101 SIS-LG RB'ISION SEC 19. T11N, R15E, 1153.94 FEL444.14 FN..
02105102 RNI1P CORREC11ONS BP Exploration (Alaska)
SCANNEDJUN 2 1 2002
TREE = FMC G9j 4
WB-Ll-EAD = aN
A·ctùÄtOR·~··' "'-'BÃkER C
~ - .'~ ~- ~ - - --.-....-....... ----" ~ . ...... -- -._- -'- -- .----. ".--
KB. ElEV = 47'
~ .. 4..,. . .. ...~.__._. ... _ ".".,_ _. _
BF ELEV -
18-188
Proposed CTD Sidetrack
SAFETY NOTES: 70° @ 9294'
AND 90° @ 11559'
-
...- .. . . ,. '-'-" ..-.- . . -'
KOP= 5594 f
~x. A.n~1E! = . ..-.... .........-........ '''~.. .....--....-.
~.~. .~ - ! ~.~~ ~~ I
Datum MD = 12404 ' J 2218' 4-1/2" CAMCO TRDP-4A SSSV NIP, Ð = 3.81:
. . -. ~ þ"- ...- ... .. -. __·'4 .1
DatumTVD = 8800' S5
~ GAS LFT MANDRELS
13-3/8" CSG, 72#, L-80, Ð = 12.347" 3473' ~ ST MD lVD DEV TYÆ VLV LATCH PORT DATE
1 3278 3278 0 TGPD RK
l 2 5783 5776 15 TGPD RK
3 8413 7983 55 TGPD RK
Minimum ID = 3.725" @ 8569'
4-1/2" HES XN NO-GO NIPPLE g ~ ---1 8484' 9-5/8" X 4-1/2" TIN HBBP PKR I
~ I
Jl . 8569' 4-1/2" HES XN NO-GO NIP, Ð = 3.725" I
~
I TOP OF 4-1/2- LNR 8561' 1
~ . 8581' 4-1/2" TUBING TAL WLEG I
14-112- TBG, 12.6#. l-80, 0.0152 bpf, D = 3.958"
8581' I H aMI) IT NOT LOGGED ,
TOP OF 7" LNR 8605' 1 I
I I
~ d 10500' Top of 3-3/16" Liner I
9-5/8" CSG. 47#, L-80, Ð = 8.681" 8934' 10500' Top of cement I
/
í f
7- SIDETRACK WINDOW
J : ;' ~ @ 9726' - 9776'
r LNR, 29#, L-80, 0.0371 bpf, Ð = 6.184- H 9726' I
~ ' 12200' 3-3/16" x 2-7/8" X-over
~ .
PERFORA TION SUMMARY ~~ I 13000' Bottom of cemented liner I
REF LOG: BHCS ON 10/18/86 ~~~ ~.:,: \
)( ~ .'
ANGLEATTOPÆRF: 87° @ 11510' I - - - -
Note: Refer to Production DB for historical perf data ~ J~ ,i '~--'~_~_4'~' 0 0 0 0 ~
~ ~ ~ "':"1":'.9,: r "...-
SIZE SPF NTERV AL OpnlSqz DATE ~~ ~~ ~ v - . . .
2-1/2" 4 11510-11685 0 03/21/95 ~ \I ¡t 3-3116" x 2-7/8" Cemented/drHled 13600' I
2-1/2" 4 11750-11915 0 03/21/95 I ~ ~
X x
2-1/2" 4 11960-12145 0 03/21/95 ~ 12100' 4-1/2" rvtechanical Whipstock I
...
2-1/2" 4 12380-12490 0 03/21/95
2-1/2" 4 12550-12790 0 03/21/95
2-112" 4 12930-12970 0 03/21/95 I 12249' H BKR aBP- 04/06/01 (
I PBTD 12974' I
t
I 4-1/2" LNR, 12.6#, L-80. 0.0152 bpf, D = 3.958- 13058' I
I
DATE REV BY COMMENTS DATE REV BY COM\ENTS PRUDHOE SAY UNIT
1986 ORIGNAL COtvA..EnON W8...L: 18-18A
03118195 SÐETRACK CQMJlEllON PffiMrr No: 195-0140
01/09/00 SIS-IsI CONVSUED TO CAtN AS API No: 50-029-21872-01
02122101 SIS-LG REVISCN ,...,..... Ii.. 6. I __S~ 1P. Tl1N. R15E 1153.94 Fa 444.14 FNL
02105/02 RNfTP CORRECTDNS '-1,-" .... _ _:J \J U I~ åP.-":& .....,:Ion (Alaska)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
Operation shutdown_
Pull tubing _
Stimulate
Alter casing _
5. Type of Well:
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
Development _X
Exploratory_
Stratigraphic_
Service
404' FNL, 4745' FEL, Sec. 19, T11N, R15E, UM
At top of productive interval
2284' FNL, 1573' FEL, Sec.13, T11 N, R14E, UM
At effective depth
(asp's 691951, 5961467)
(asp's 690086, 5964823)
At total depth
444' FNL, 1154' FEL, Sec. 13, T11N, R14E, UM
12. Present well condition summary
Total depth: measured
(asp's 690456, 5966670)
true vertical
13062 feet
8672 feet
Plugs (measured)
Effective depth:
12249 feet
8680 feet
Junk (measured)
measured
true vertical
Casing
Conductor
Surface
Production
Liner
Liner
Length
110'
3426'
8887'
1121 '
4497'
Size Cemented Measured Depth
20" 2150# Poleset 110'
13-3/8" 200 Sx CS 111,600 Sx Class G, & 3473'
200 Sx CS II
9-5/811 750 Sx Class G 8934'
7" 500 Sx Class G 9726'
4-1/2" 462 Sx Class G 13058'
True Vertical Depth
110'
3471'
8257'
8524'
8674'
Perforation depth:
Plugging _ Perforate
Repair well _ Other _X (CIBP)
6. Datum elevation (DF or KB feet)
RKB 46.50 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
1 8-1 8A
9. Permit number / approval number
195-014
10. API number
50-029-21872-01
11. Field / Pool
Prudhoe Bay Oil Pool
Set CIBP @ 12249' on 4/06/2001.
measured 11510'-11685'; 11750'-11915'; 11960'-12145';
(Isolated below CIBP 12380' - 12490'; 12550' - 12790'; 12930' - 12970').
true vertical 8671' - 8673'; 8674' - 8677'; 8677' - 8678'; R E eEl VE D
(Isolated below CIBP 8676' - 8673'; 8671' - 8671'; 8671' - 8671').
Tubing (size, grade, and measured depth) 4-1/2",12.6#, L-80 Tbg @ 8581' MD.
Packers & SSSV (type & measured depth) 9-5/8" X 4-1/2" TIW HBBP PACKER @ 8484' MD.
4-1/2" CAMCO TRDP-4A SSSV @ 2218' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
MAY 0 3 2001
Alaska Oil & Gas Cons. Commission
Anchorage
Prior to well operation
Oil-Bbl
1184
Representative Dailv Averaqe Production or Iniection Data
Gas-Mcf Water-Bbl Casing Pressure
37886 0
o
Tubing Pressure
1789
1693
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run _
Daily Report of Well Operations X Oil X Gas
17. I hereby certify that the fore g is true and correct to the best of my knowledge.
1116
24175
16. Status of well classification as:
Signed
AI Schmoyer
Title: OS 18 Surveillance Engineer
Form 10-404 Rev 06/15/88·
rnp,¡r<Jhl/"1
, j ," l"1 ¡ I \¡ I~ ¡
Suspended
Service
Date April 27. 2001
Prepared by Paul Raul 564-5799
SUBMIT IN DUPLICATE
18-18A
DESCRIPTION OF WORK COMPLETED
SET CIBP FOR GSO
Date Event Summary
4/05/2001: MIRU CTU. PT'd stack & surface lines. RIH wi CT & drifted to 12400' CTM. Killed well wi
20/0 KCI Water. POOH wi CT.
4/06/2001: A CIBP fl GSO was performed as follows: RIH & set CIBP in the 4-1/2" horizontal liner @
12249' MD to isolate the following open perforations:
11380' - 11490' MD (Zone 1 B) Reference Log: BHCS 10/18/1986.
12550' - 12790' MD (Zone 1 B)
12930' - 12970' MD (Zone 1 B)
Retagged CIBP & POOH w/ CT. RD CTU.
Placed well BOL & obtained a representative production test.
Page 1
Uq/UÐ/~UUi if;ÐO ~ftA ~Uf ÐUq 4f~~
April 5, 2001
tlr l!.ArLu.KfUIUI\
LgJ UU i
bp
J g 5 - 0 JL-l_tAt_
"''-..''~OiLI
~:~ -:~
...~ F.....
·'I'.~I\·
".
ONLY
@JIØr I
.-~
I-Comm I J
r~~-3
BP Exploration (AJaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Julie Heusser, Dan Seamount, & Cammy Oechsli Taylor
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, AK 99501
Fax 276-7542
Dear Commissioners:
Re: Prudhoe-EOA. Pt. Mac. & Lisburne Well Work,
This listing is provided as required under the tenns of Conservation Order No. 341C (Rule 14) &
Order No. 342. This is a list of well work tentatively scheduled for April 2 - 9,2001:
Well Work Planned
02-19
02- 21
05-17B
06- 21A
07 -08A
11-22A
15-43
16-05 Ai
18-04A
18-13A
-_-"-,....,.-e:~~..._.,...:-;---" -- - ~ .-- - .
, ·'l8-18A··
ADD PERFORATION
ADD PERF ORA nON
ADD PERFORATION
CTE PERFORATION
CT REMOVE 2-3/8" GL COIL
ADD PERFORATION
SET cmp WI CT
CT REPERFORA TION / ACID STIMULATION
CT REMOVE 2-3/8" GL COIL
CT SET CIBP FOR GSO
SET eIBP WI CT
'i"'
. Qð"ë
/~^"
.,~ (}/:: '.
4Px> " II/€-_
v" <I ü 0 6" <'t? 'D
4", ~ (; ë)¡
~o~ CJ?~ C;..._
We - Vf/J~.
"I'
Starting next week, I will be including WOA, Milne Pt, & Endicott wellwork. If additional data
or scheduling information is needed, please call me at 564-5799 or E-mail meatraufpc@bp.com.
i
¡.
i
i
I
I
sincere~il¡(
Paul C. Rauf
Technical Assistant, BPXA
Alaska Drilling & Wells
.---. ----
ct
~~
THE MATERIAL UNDER THIS COVER HAS BEEN
-
MICROFILMED
ON OR BEFORE
JA1'!Q~RY 03, 2001
r
~
. III!
I
-
II
it .
P L '^ W
- - -
MAT E IAL UNDER
---------
THISM ARKER
C:LORI\MFll..MDOC
PEF<r"'IIT
D;:\T/\
;\ () Gee I n (1 oj' v -j' d U .31 \1.1 c:/ i
',,1 ! 0 ';J -\ C a I 1',1 ,;:'i t: e [", ii a I sIn v <3 n tor
yo I 3 D ~ ¡
T D/.\T/\,,_PLtJ::; pl})~ 97'1
F; IJ r-) D j:o., T E__J~ E C; \,/[)
r' ';:1 ',~j c: :
D:3t;:;~'~ i i/2g/9G
.~.... .......- ~'.... ..... ....... 'T'",", ~-.-~ ~~. ".-, ....... .....- ....... .-.... ~~. .~... -...... ","," ."........ ~....._ ........ ~-_- ",". "'Ù' ....-.-..
.... ..... "'.'- "'" ,-N v.... ".
95 vvOj 4
9~;'N01f+
95-01 h
9 5 " 0 'j Lt·
95""01h
D~)v.v01L¡
95~v01h
9~v" Q 1.11
95'vO'lh
95v-014
95~014
~~~~~"",-~~~'~-""'~~~~~'Y~~~~~~
E3 ~'1 c: /' /~.. (~:
...c--l 0 9 0 9 ,-) 2 0 0 0
0:3/28/95
CN-·Gk
~7 2~)"-i ·1968
03,/2e/95
j\)G P
-Y8536'8677 TVD
lw()
08/30/9f)
P P ()D
-C 9058--12900
07/27/95
ROP/r.,lGP
08/30/St)
--+:--1j-7 7 6 "'1 1 9 5 2 M D
,,4
RC)P/Ì'--jGP
C9-7 7 6--120 11 MD
OÜ/jo/Ç)~)
i l¡.
:3 S .1" f3 (-,"'i (:
~ .j 09 0 9 ,w1 20 0 0
U3/28/9~:;
___. C ¡.,j -",_v~-----~'2-&-1~HJ-6'ô-"'" -~- '""'_~"':Y'-r.tJ.C:-f¿-~- ...------.-¡
"rt}"r...p/I'r-tSJ/'f'<...-p/Gtf./'tl. ~ IOìDcJ... 1)..9;-'1 JJu.~ ~""v ""
67 27 ~j 1653 --10689 TDT
.. -'... O~~~/..;~e/-.9S_
g 10 , I"J-
07/2J/9r:,
7 5i 8
"';:¡;--1 , 2 ; 5 , 7 ~ 8 M \^/D v" C¡ R
'1i /1 ~~),/ 9 (3
7519
·Yf\1 \.1/0 -- G R P B1
T I\- G-/ CN I r,,,q 7.J,J- .... / il..OeiQ
J/ À ð'/IJJ--
1 '" L~
11/15/96
')7)
/\ r·· e d r' V d'j' t c h s a rn p 1 e ~3 r' e q u , r' e d ?
V e 2.; ~.I'\ n dr·' (-3 C >2 'I' v e d '~)
If .:~ ::' i"1 U
If e s ~':'::1 i If S '1 S (y_ des c r' î p t -'Ion r' e c e '1 ve (j ?
Was the we! 1 cored?
v @ :::' (I C,
/\ (, E~ we 11 t e ~)t 2.~; r" e qui (' e d ? yes:; ~; e¡' v e d '?
--y :: ~~. r -·1 C" j
We 1 I -¡ s '1' n COiïJp j ,'ance
In''¡'t,'E¡l
¡,-, (-.¡ M H F r..j T 0;:;
>=-_<_~<_~_!iQ2__~<. >/).'f/~-__----«-«<--_«___~LQJþj=_<
___"m,___,_~---,_J2~_~.)tL .. _ vt ;'hJjJr_=,-2lE-_!Lf.~______~_______"m__.~m,,__~_,__,,_~__31Q1_Lf{,L:m._,m,.
._~__",,_._,um___,_~____1>J~,~..\W~~"___m~_ft __~ q 7 1 ~ -, I ,~_~_~~J::~m~1v ~__'_mu_m_m"",_""_"_~"u_"~,,,,~,_':!1tJ_/~,,):::,,,,_,__~,,
D~... ~\A1I"\I~ ~ ~ 1 >0 - 119)-,t Jpll''-ï Sc.o" 0JlW"""MJ)~ <-1/IJ /'J-
-~
sper'r'\I-5un
CRILLING SERVICES
WELL LOG TRANSMITTAL
To: State of Alaska November 13, 1996
Alaska Oil and Gas Conservation Corom. ~
Attn: Howard Okland d ' ./ \~
3001 Porcupine Dr. . :;" /'fS \ "3 .¢' '1':>
Anchorage, Alaska 99501 ¿1..&./
RE: MWD FonnationEvaluation Tapes - DS 18-18A & 18-18APB1
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AI( 99518
2 LDWG fonnatted magnetic tapes with LIS listing.
~
API#: 50-029-21872-01 & 50-029-21872-70 respectively.
R· .·.~."'-C·\=i.\·.¡F·D
1- ~.~1 ..-
'\~ . -' .. .
1 ~'Q('IÔ
\"¡\jr"¡\f \.1 \"'...
, ," ...,
\ "
.,., . ,.... "{f'mic:.mcn
".,"' 11 "-"s:.~ ì ...""\n~ '. ·'-.ÝhL.,..,.~1 "
~\~Ka i,,)H ~ \;:t;t.~ '" -~.. .""
, ,-,_..~ ,~nd1m~G
5631 Silverado Way, Suite G . Anchorage, .Alaska 99518 . (9.07) 563-3256 . Fax (907) 563-7252
A Dresser Industries, Inc. Company
sper'r'v-sun
CAILLING SEAVIt:eS
To:
ARCO Alaska Inc.
Attn: Larry Grant, AOGCC
P.O. Box 100360
Anchorage, Alaska 99510-0360
MWD Formation Evaluation Logs
WELL LOG TRANSMITTAL
q ~;-O\~
August 26, 1995
/
RE:
- DS 18-18A, AK-MW -50016
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
DS 18-18A:
2" x 5" MD Gamma Ray Logs:
1 Blueline
1 Folded Sepia
50-029-21872-01
2" x 5" TVD Gamma Ray Logs:
1 Blueline
1 Folded Sepia
50-029-21872-01
DS 18-18A PBl:
2" x 5" MD Gamma Ray Logs:
Jr
~tCF··
. '- - -. I V ED
l?¡ f ¡ <~
ð~u(i 3
if:> 1 I 0 l'd!':)",
IqS ...., O. \7")1)
"Q 'h ù . " t
1 Blueline
1 Folded Sepia
50-029-21872-70
AfìC(¡r\ r
VI qf¡& . . ·,-,"fíOn
5631 Silverado Way, Suite G . Anchorage, Alaska 99518 . (9.07) 563-3256 . Fax (907) 563-7252
A Dresser Industries, Inc. Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION -REPORT AND LOG
1. Status of Well Classification of Service Well
OIL ŒJ GAS 0 SUSPENDED 0 ABANDONED 0 SERVICE 0
2. Name of Operator 7. permit(N4tnþer ?
ARCO Alaska, Inc. 95-14 J I:~ / "r ,
3. Address 8. API Number . , f· .'. :,/,
P. O. Box 196612, Anchora.qe, Alaska 99519-6612 50- 029-21872-òi./ / ,!
4. Location of well at surface ~ 9. Unit or Lease Name i /
4874' NSL, 5075' WEL, SEC. 19, T11N, R15E rC:·D~¡~i~~·T~'·:~·1 Prudhoe Bay Unit
At Top Producing Interval L~:;¡~ 1 ...~.¡ 10. Well Number
3532' NSL, 1736' WEL, SEC. 13, T11N, R14E 18-18A
¡ æJilFlED I I. H.~~: 11. Field and Pool
At Total Depth ! _.~~~. j:::---~~ 1 Prudhoe Bay Field/Prudhoe Bay Pool
- - . ~,,- '"'-.,,-- "'-- ~ ~ --
4886' NSL, 1085' WEL, SEC. 13, T11N, R14E - -
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
KBE = 46.5' ADL 28307
12. Date Spudded 13. Date T.D. Reached 14. Date comp~sp. or Aband. 15. Water Depth, if offshore 116. No. of Completions
3/5/95 3/18/95 ~ J ¿~Æ(" ~A N/A feet MSL One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directionál Survey 20. Depth where SSSV set 121. Thickness of Permafros t
13062' MD /8673' TVD 12974' MD /8672' TVD YESŒI f\OO 2218' feet MD 1900' (Approx.)
22. Type Electric or Other Logs Run
GR, BHCA, CNL
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTlNGRECORD AMOUNT PULLED
20" 91.5# H-40 Surface 110' 30" 2150 # Poleset
13-3/8" 72# L-80 Surface 3473' 17-1/2" 200 sx CS 11//600 sx "G"/200 sx CS /I
9-5/8" 48# L-80 Surface 8935' 12-1/4" 750sx Class "G"
7" 29# L-80 8605' 9726' 8-1/2" 500sx Class "G"
4-1/2" 12.6# L-80 8561' 13058' 6" 462 sx Class "G"
24. Perforations open to Production (MD+ TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
Gun Diameter 2-1/2" 4 spf 4-1/2" 8581' 8484'
MD 7Vf)
11510'-11685' 8671'-8673' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11750'-11915' 8674'-8677' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11960'-12145' 8677'-8678'
12380'-12490' 8676'-8673'
12550'-12790' 8671'-8671'
12930'-12970' 8671'-8671'
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Apri/18, 1995 Flowin.q
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
IrEST PERIOD .
Flow Tubing Casing Pressure !CALCULATED . OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
R .t:' _ ~~ : ~ 'E D
..... -. -. "
AUG 03 1995
AlaSka Oii .& Gas Cons. Commission
..¡ ......_~t ~choraga
Form 10-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplicate
.,. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
GOG 10814 ' 8588'
Low Gas 10858' 8580'
Zone 1 B 10976' 8588'
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
j 1~L ~-
Signed 7 (J}II'1 Title Senior Drillim; Engineer
Date 0 \ ~5
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24 : If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
-~'+.. 1ED
R f-. ,"9· .,
AUG 0 3 1995
AlaSka ou & Gas Cons. Commission
"'-L ~chorage
Form 10-407
r--.
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
DS 18-18A
NORTH SLOPE
PRUDHOE BAY
PRUDHOE BAY
WELL:
BOROUGH:
UNIT:
FIELD:
LEASE:
API:
PERMIT:
APPROVAL:
50-
ACCEPT: 02/27/95 08:00
SPUD:
RELEASE:
OPERATION:
DRLG RIG: NABORS 2ES
WO/C RIG: NABORS 2ES
02/26/95 1)
TD:11525
PB:11481
02/27/95 2)
TD:11525
PB:11481
02/28/95 3)
TD:11525
PB:11481
03/01/95
TD:11525
PB:11481
4)
RIG ON STANDBY
MW: 0.0
RIG ON STANDBY WAITING ON DS 18-18A PREP.
MOVE RIG 18-14A TO 18-18A MW: 0.0
STAND-BY - WAIT ON DS 18-18 PRE-RIG WORK TO BE COMPLETED
AND LOCATION LEVELED. MOVE RIG DS 18-14A TO 18-18A.
L/D TBG HANGER MW: 0.0
FINISH MOVING RIG 18-14A TO 18-18A - HOOK-UP SERVICE LINES.
ACCEPT RIG 0800 HRS 2/27/95. TAKE ON SEA WATER - PULL BPV
WITH LUBRICATOR - NO WELL PRESSURE INSTALL 2ND VALVE ON
ANNULUS - TEST 9-5/8" PACKOFF 5000 PSI -OK. CIRC WELL WITH
SEAWATER PUMPING DOWN TBG RETURNS UP ANNULUS - DIESEL AND
GEL DIESEL RETURNS. SET BPV AND TEST TO 1000 PSI - BLOW
DOWN LINES. ND FMC 3-1/8" 5000 TREE AND 11"X 3-1/8"
ADAPTER. NU 13-5/8" 5000# HYDRILL BOP STACK. PULL BPV
WITH LUBRICATOR THRU STACK - MONITOR WELL - OK - R/D LUB.
TEST BOP: TEST TOP PIPE RAMS, BLIND RAMS, CHOKE MANIFOLD,
MUD MANIFOLD, KELLY, UPPER AND LOWER KELLY VALVES AND
3-1/2" TIW & IBOP TO 250/5000 PSI - TEST HYDRILL TO
250/3000 - WITNESS OF BOP TEST WAIVED BY JOHN SPALDING OF
AOGCC. - COULD NOT TEST BOTTOM PIPE RAM DUE TO TOOL JT IN
RAMS - WILL TEST AFTER PULLING TBG. MAKE UP SPEAR - BACK
OUT LOCK DOWN SCREWS. SPEAR TBG BELOW HANGER - PULL TBG
FREE 95K-L/D TBG HANGER.
TIH - PU 4-1/2" DP MW: 0.0
CBU - MONITOR WELL - OK. POOH L/D 3-1/2" 9.3# L-80 EUE 8RD
MOD TBG - RECOVERED 274 JTS & CUT JT. - TOP OF FISH @ 8783'
TBG MEASUREMENTS - TBG IN GOOD CONDITION. SET TEST PLUG -
TEST BOTTOM PIPE RAMS AND 4-1/2" IBOP TO 250/5000 PSI.
INSTALL WEAR BUSHING - MOVE 3-1/2" PIPE IN DERRICK. MAKE
UP FISHING ASSY #1 - 5-3/4" OVERSHOT D/WITH 3-1/2" GRAPPLE.
TIH - PICKING UP 4-1/2" 16.6 S-135 DP. CAT HEAD NOT
PULLING PROPERLY - ADJUST SHIMS ON CLUTCH PLATE. CONTINUE
TIH PICKING UP DP. CLIP AND CUT DRILL LINE. CONTINUE TIH
PICKING UP DP. WORK ON DRLL SIDE CAT HEAD - ADD ADDITIONAL
SHIMS. CONTINUE TIH PICKING UP 4-1/2" 16.6 DRILL PIPE -
8500' PICKED UP @ 0600 HR.
R ;~< :,.'~' E 0
AUG 0 3 1995
~ 011 A Gas Cons. Commission
- --~i... AJ\choraga
WELL DS 18-18
OPERATION:
RIG NABORS 2ES
PAGE: 2
03/02/95
TD:11525
PB:11481
5)
03/03/95
TD:11525
PB:11481
6)
03/04/95
TD:11525
PB:11481
7)
CIRC - DISPLACE TO MILLING FLD MW: 0.0
CONTINUE RIH. TAG AND LATCH FISH @ 8771'. JAR FISH FREE.
POH WITH FISH. LAY DOWN 3 1/2" L-80 EUE TUBING WITH 1 3/4"
COIL TUBING STUCK INSIDE OF TUBING, BOTH STRINGS WET, CUT
COIL TUBING WITH MANUAL PIPE CUTTER COULD NOT DISLODGE COIL
TUBING MUD MOTOR. RECOVERED TOTAL 312 JTS 3 1/2" TUBING
FROM WELL, R/D CASING TOOLS, CLEAR RIG FLOOR. BREAK DOWN
FISHING TOOLS. MAKE UP BHA #2, RIH, TAG FILL @ 9793'. P/U
KELLY, WASH AND REAM 9793' TO TOP OF PACKER SLICK STIVK @
9966' DP. CIRCULATED BOTTOMS UP, CHANGE OVER TO MILLING
FLUID.
CIRCULATE REDUCE MUD WT MW: 0.0
DISPLACE TO 9.6 PPG USED MILLING FLUID. POH TWO STANDS,
MIX AND PUMP SLUG. POH FOR SECTION MILL. CHANGE OUT
DRILLER SID CAT HEAD. MAKE UP SERVCO 5500 MILLMASTER
SECTION MILL AND BHA. RIH AND SPACE OUT, P/U KELLY. CUT
OUT WINDOW IN 7" CASING @9726'. MILL SECTION 9726 - 9729'.
HOLE TAKING FLUID. STOP MILLING REDUCE FLOW, START CUTTING
MUD, RUN CENTRIFUGE AND ADD WATER.
RIH OPEN ENDED FOR KICKOFF PLG MW: 0.0
CONTINUE CUT MUD WT. CUT SECTION 9729 - 9759'. SLIGHT MUD
LOSS. PUMP LOW VIS/HIGH VIS SWEEP AROUND TO AID HOLE
CLEANING, MAKE CONNECTION. FINISH MILLING SECTION 9759 -
9776'. TOTAL 50' OF WINDOW 9726 - 9776'. PUMP LOW
VIS/HIGH VIS SWEEP AROUND. POH, NO TROUBLE GETTING BACK
INTO 7" CASING WITH SECTION MILL, 90' OUT OF HOLE STARTED
PULLING TIGHT, BREAK CIRCULATION TO CLEAR UP TIGHT SPOT,
LAY DOWN 9 SINGLE, WORK WAY INTO 9 5/8" CASING. LAY DOWN
BRA ANS SECTION MILL, ONE BLADE SLIGHTLY BENT, 15% WEAR,
MILL IN GOOD CONDITION. CLEAR AND WASH RIG FLOOR. RIH
WITH OPEN ENDED DRILL PIPE FOR KICK OFF PLUG, BREAK
CIRCULATION EVERY 1000'.
R£ _"::..: E D
AUG 0 3 1995
WELL DS 18-18
OPERATION:
RIG NABORS 2ES
PAGE: 3
03/05/95
TD:11525
PB:11481
8)
03/06/95
TD : 98 07
PB: 8525
9)
03/07/95 ( 10)
TD : 1 0 5 61' ( 0 )
03/08/95 ( 11)
TD : 113 5 0' ( 7 8 9 )
03/09/95 ( 12)
TD : 115 71' ( 221 )
TEST BOP MW: 0.0
RIH WITH OPEN DRILL PIPE FOR KICK OFF PLUG, BREAK CIRC
EVERY 1000'. PICK UP KELLY AT LINER LAP, ROTATE AND
CIRCULATE. PUMP LOW VIS/HIGH VIW SWEEP AROUND. SMALL
AMOUNT OF METAL IN RETURNS. CONTINUE RIH TO 9520', PICK UP
KELLY. WASH 9520 TO 100' BELOW WINDOWN @ 9880'. PUMP 30
BBL LOW VIS. SWEEP. ROTATE AND RECIPROCATE PIPE. ATTEMPT
TO CLEAN HOLE OF ANY METAL CUTTING BEFORE SETTING CEMENT
PLUG. SET BALANCE KICK OFF CEMENT PLUG. POH 14 STANDS
INTO 9 5/8" CASING. CEMENT IN PLACE. CIRCULATE ON DRILL
PIPE VOL LONG WAY. HESITATE SQUEEZE. SQUEEZE TWO BBL AWAY,
FINAL SQUEEZE PRESSURE AFTER ON HR. EST TOP CEMENT 9469'.
POH. SLIP AND CUT DRILLING LINE. FINISH POH LAY DOWN 72
JTS 4 1/2" DRILL PIPE. FLUSH STACK, PULL WEAR BUSHING,
OPEN RAMS DOORS CLEAN OUT METAL. SET TEST PLUG, TESTING
BOP.
DISPLACING TO FLOPRO MW: 0.0
COMPLETED STATE BOP TEST. MU AND TESTED BHA #4, RIH.
TAGGED CEMENT STRINGER @ 8988'. CLEANED OUT STRINGERS TO
9480', DRILLED HARD CEMENT F/ 9480 - 9730'. CIRCULATED
HOLE CLEAN. ORIENTED AND BEGAN KICKOFF. SLID F/ 9730 -
9776', PAST STUMP. DRILLED F/ 9776 - 9807'. CBU, PUMPED
SPACER AND BEGAN DISPLACING WELL TO FLOPRO SYSTEM.
MU BHA # 5 MW: O. 0 VI S : 0
FINISHED DISPLACING TO FLOPRO SYSTEM, CLEANED SHAKERS.
DRILLED F/ 9807 - 10561'. ROP DECREASED W/ ERRATIC TORQUE,
SOME DIFFICULTY SLIDING AT END OF BIT RUN. BIT PROBABLY
UNDER OR ROUNDED GAUGE. TOTAL 18 BIT HRS INCLUDING CEMENT
AND KICKOFF. CIRCULATED HOLE CLEAN. POH. Y" LINER AND
LAP AREA CLEAN. HOLE FILL UP NORMAL. CHANGED BITS AND MU
BRA #5.
CBU MW: O. 0 VI S : 0
MU BHA #5, RIH AND FLOW CHECKED MWD. RIH. PU 21 JTS 3
1/2" G DP. SLIPPED AND CUT DRILLING LINE. RIH. TAGGED
TIGHT SPOT IN 7" LINER AT 8995', PU KELLY AND WASHED THRU
TO 9100', NO WOB OR DIFFERENTIAL REQUIRED TO WASH THRU,
SUSPECT DAMAGED/CORRODED LINER THRU THIS SECTION.
CONTINUED RIH TO 10463', REAMED 98' TO BOTTOM. DRILLED F/
10561 - 11350'. CIRCULATE HOLE CLEAN.
POH MW: O. 0 VI S : 0
CIRCULATE HOLE CLEAN. POH F/ BHA. NO EXCESS DRAG, HOLE
FILL UP NORMAL. MU BHA #6, RIH AND FLOW CHECKED MWD. RIH
W/ BRA #6. REAMED F/ 11277 - 11350'. DRILLED F/ 11350 -
11571'. CIRCULATE HOLE CLEAN. MONITORED WELL, WELL
STABLE. POH F/ BHA. NO EXCESS DRAG IN OH.
..,',co
R E ..,~ ~ J ~~ ~
AUG 0 3 \995
nil A Gas~~. ~OO
~.'''''' ... .~.. .-
~.....,
WELL DS 18-18
OPERATION:
RIG NABORS 2ES
PAGE: 4
03/10/95 ( 13)
TD : 11 9 52' ( 3 81 )
03/11/95 ( 14)
TD : 11952' ( 0 )
03/12/95 ( 15)
TD : 113 0 0' ( 0 )
03/13/95 ( 16)
TD : 11 6 0 0' ( 3 0 0 )
SHORT TRIP INTO 7" CSG MW: 0.0 VIS: 0
FINSIH POH FOR BHA. LAY DOWN 1.5 DEGREE MOTOR. PICK UP
1.75 DEGREE MOTOR, CHANGE BIT AND SERVICE MWD. PULL WEAR
BUSHING, DOPE AND RE-INSTALL, ORIENT AND FLOW TEST MWD, OK.
RIH W/ 1.75 DEG MOTOR. SLIP AND CUT DRLG LINE. CONTINUE
RIH. TAG TIGHT SPOT IN 7" CSG @ 9152'. P/U KELLY WASH TO
9152 - 9170', WASH CLEAN, SET BACK KELLY. CONTINUE RIH.
PRECAUTIONAY REAM 11529 TO BOTTOM @ 11571'. NO FILL.
DRILL 11571' TO LOGGING POINT @ 11952'. SLIDE AND TURN
WELL TO RIGHT.
PULL OUT OF HOLE MW: 0.0 VIS: 0
SHORT TRIP TO TOP 7" LINER, PRECAUTIONARY REAM 70' TO
BOTTOM. CIRCULATE HOLE CLEAN, MONITOR WELL, OK. POH WET
TO 7" SHOE, MONITOR WELL, OK. CONTINUE POH WET. LAY DOWN
MWD, MOTOR, BUMPER SUB AND JARS, CLEAR FLOOR. SERVICE W/B.
RIH W/ 3 1/2" MULE SHOE TO 11949'. CIRCULATE BOTTOMS UP,
BATCH MIX 35 BBL CEMENT SLURRY. TEST LINES. SET OPEN HOLE
CEMENT PLUG WITH 200 SX CLASS 'G'. DISPLACE WITH RIG PUMP
TO BALANCE PLUG. PULL OUT OF CEMENT SLOW, CONTINUE POH
INTO 7" CASING. CIRCULATE BOTTOMS UP. EST TOP OF CEMENT @
11000'. CONTINUE POH WET, LAY DOWN 43 JTS 4 1/2" DRILL
PIPE.
CIRCULATE BOTTOMS UP MW: 0.0 VIS: 0
CONTINUE POH, WET TRIP. SLIP AND CUT DRILL LINE. FINISH
POH, LAYU DOWN MULE SHOE. PULL WEAR BUSHING, SET TEST PLUG,
TEST BOPE, TEST ALL RAMS, LINES VALVE TO 300 LOW AND 50000
PSI HIGH. TEST KELLY, TEST HYDRIL, ALL OK. INSTALL WEAR
BUSHING. CLEAR FLOOR, MAKE UP BHA #8, TEST MWD, OK. RIH.
TAG CEMENT STRINGER @ 9741', P/U KELLY. REAM AND DRILL
CEMENT STRINGER 9741 - 10367'. LAY DOWN 32 JTS OF 4 1/2"
DRILL PIPE, RIH WITH 11 STANDS FROM DERRICK. WASH, REAM
AND DRILL CEMENT STRINGER 10367 - 11150'. DRILL FIRM
CEMENT 11150 - 11300'. CIRCULATE HOLE CLEAN BEFORE POH FOR
KICK OFF ASSEMBLY.
DRILLING MW: 0.0 VIS: 0
CIRCULATE HOLE CLEAN, MONITOR WELL, OK. POH WET TRIP.
HOLE FILL NORMAL. CHANGE BHA, P/U 1 3/4" BH MUD MOTOR,
CHANGE MWD TOOLS, SERVICE WEAR BUSHING, TEST MWD, OK. RIH
WITH BIT #6, WASH 55' TO BOTTOM, NO FILL. SURVEY AND
ORIENT, KICK OFF CEMENT PLUG @ 11300', DRILL 11300 -
11383'. DISPLACE TO NEW 9.0 PPG FLOPRO MUD, DISPLACE TO
NEW MUD DUE TO HIGH PH AND MUD WT. DRILL 11383 - 11600'.
D.r.. '. .. ·'.1ED
I' f. "'-- ..' ..
AUG 0 3 \995
~ 011 A Gas eons.. ~ISSÌQß
-.....\..~,.
WELL DS 18-18
OPERATION:
RIG NABORS 2ES
PAGE: 5
03/14/95 ( 17)
TD : 12011' ( 411 )
03/15/95 ( 18)
TD : 12 0 11' ( 0 )
03/16/95 ( 19)
TD : 12 0 11' ( 0 )
03/17/95 ( 20)
TD : 12 8 4 7' ( 8 3 6 )
RIH wi DP CONVEYED LOG TOOLS MW: 0.0 VIS: 0
DRILL 11600' TO LOGGING POINT @ 12011'. CIRCULATE OPEN
HOLE VOLUME. SHORT TRIP INTO 7" CASING, NO PROBLEM. FILL
UP, OK. NO FILL ON BOTTOM. CIRCULATE. MONITOR TOOL FACE
WILL NO STAY ON HIGH SIDE WHILE RECIPROCATING PIPE. POH
INTO 9 5/8" CASING, SLM. FINISH CIRCULATING BOTTOMS UP,
SLIP DRILL LINE. FINIDH POH WET, SLM, NO CORRECTION. LAY
DOWN MOTOR AND MWD. PULL WEAR BUSHING. BOPE AN RE-INSTALL
WEAR BUSHING. MAKE UP ATLAS DRILL PIPE CONVEYED LOGGING
TOOLS - GR/BHCA/CNL.
MAKE UP BRA #10 MW: 0.0 VIS: 0
FINISH Mlu ATLAS LOGGING TTOLS - GRIBHCAICNL - TEST TOOLS,
OK. TRIP IN HOLE WITH LOGGING TOOL SLOW TO 9500'. HANG
W/L SHEAVE IN DERRICK - Mlu SIDE ENTRY SUB, PUMP DOWN WET
CONNECT, LATCH UP. RIH wi LOGGING TTOLS LOGGING DOWN,
SONIC NOT WORKING, LOG UP 12007 - 9725'. SONIC TOOL
WORKING INTERMITTENTLY. POH WITH ATLAS WIRE LINE, RIG DOWN
ATLAS. POH LAY DOWN 27 JTS 4 1/2" DRILL PIPE, CLEAR FLOOR.
MAKE UP BRA #10, ADD 10' MONEL FROM MUD MOTOR TO MWD.
RE-SURVEY MW: 0.0 VIS: 0
FINISH MAKE P BRA #10. TEST MWD, OK. PICK UP 18 JTS 3
1/2" DRILL PIPE, RIH. SLIP AND CUT 80' DRILL LINE.
CONTINUE RIH TO 11355'. SURVEY @ 11310' FOR AZIMUTH
VERIFICATION OK. AZIMUTH MATCHED UP, CONTINUE RIH ONE
STAND. ATTEMPT TO SURVEY, MWD NOT WORKING. NO SIGNAL @
SURFACE, TROUBLE SHOOT MWD. CONTINUE RIH TO 12011'.
CIRCULATE. TROUBLE SHOOT MWD. NO SIGNAL. POH FOR MWD
FAILURE. WET. HOLE FILL NORMAL. LAY DOWN MWD. INSPECT
BIT AND MUD MOTOR. FOWUND MWD HAD A BAD CONNECTION ON COIL
CORD THAT CONNECT PULSER GENERATOR ASSEMBLY. MAKE UP MWD
TOOL AND TEST, OK. RIH. BREAK CIRCULATION @ 5000 AND
9500'. BREAK CIRCULATION, SURVEY @ 11402' AND EVEY 90' TO
BOTTOM @ 12011'. AZIMUTH CORRECTION 4 DEG TO LEFT.
SHORT TRIP MW: 0.0 VIS: 0
DRILL AND SURVEY 12011' TO TD @ 12847'. STOP DRILLING
@12847' DUE TO HOLE BUILDING ANGLE AND CAN NOT SLIDE TO
DROP ANGLE. FLUID LOSS TO FORMATION WHILE DRILLING.
CIRCULATE BOTTOMS UP. SHORT TRIP INTO 7" CASING, NO
PROBLEMS, RIH.
~ -··c'£D
R ~ . (... Ii ·
AUG 0 3 '995
~j»1 A Gas. eons. Ctmß1lS&iDn
~~r
WELL DS 18-18
OPERATION:
RIG NABORS 2ES
PAGE: 6
03/18/95 ( 21)
TD: 13062' ( 215)
03/19/95 ( 22)
TD : 13 0 62' ( 0 )
03/20/95 ( 23)
TD:13062
PB:12973
03/21/95 ( 24)
TD:13062
PB:12974
CIRCULATE MW: 0.0 VIS: 0
FINISH SHORT TRIP, NO PROBLEMS. CIRCULATE HOLE CLEAN.
MONITOR WELL, OK. POH WET INTO 7" CASING, MONITOR WELL,
OK. SLIP DRILLING LINE, FLUID LOSS TO FORMATION. CONTINUE
POH, SLM, NO CORRECTION. DOWN LOAD MWD, CHANGE BIT, LOAD
MWD AND SURFACE TEST, RIH. P/U KELLY @ 12781'.
PRECAUTIONARY REAM F/ 12781 TO BOTTOM @ 12847'. DRILL F/
12847 - 13042'. ATTEMPT DROP ANGLE AND TURN HOLE TO RIGHT,
ANGLE DROPPED 1.3 DEG. VERY LITTLE TURN. CIRCULATE UP
SAMPLES. DRILL F/ 13042 - 13062'. DRILL TO HARD LINE @
5300' NORTH COORDINATE. CIRCULATE OPEN HOLE VOLUME BEFORE
SHORT TRIP INTO 7" CASING.
RIH W/ 4 1/2" LINER MW: 0.0 VIS: 0
SHORT TRIP INTO 7" CSG SHOE. CUT DRILL LINE, TIGHTED BRAKE
BLOCK NUTS ON BRAKE BAND. RIH, NO PROBLEMS. CIRCULATE
HOLE CLEAN. MONITOR WELL, OK. POH WET. LAY DOWN 3 1/2"
DRILL PIPE AND BHA. RIG UP CASING TOOLE. RUN 108 JTS
4473' OF 4 1/2" 12.6# L-80 NSCT LINER. M/U TORQUE. MAKE
UP BAKER 9 5/8" X 4 1/2" LINER HANGER AND ISOLATION PACKER.
CIRCULATE LINER VOLUME 67 BBLS, OK. RIH WITH LINER ON 4
1/2" 16.60 DRILL PIPE. FILL DRILL PIPE EVERY 10 STANDS.
PICK UP CLEAN OUT BHA MW: 0.0
CONTINUE RIH WITH 4 1/2" 12.6# L-80 NSCT LINER AND 9 5/8" X
4 1/2" LINER HANGER. MAKE UP BAKER CEMENT HEAD ON SINGLE.
CIRCULATE DRILL PIPE AND LINER VOLUME AT 7" CASING SHOE
BEFORE GOING INTO OPEN HOLE. CONTINUE RIH WITH LINER, HIT
BRIDGE @ 10665 AND 10895'. WASH THRU BRIDGE AND CONTINUE
RIH. p/U CEMENT HEAD, BREAK CIRCULATION SLOWLY. TAG
BOTTOM @ 13062'. CIRC AND RECIPROCATE LINER. TEST LINES.
REVERSE CIRCULATE WITH MUD. PREFLUSH REVERSED OUT,
CONTINUE TO REVERSE CIRC AND DISPLACE TO SEAWATER. LAY
DOWN CEMENT HEAD. POH AND LAY DOWN LINER RUNNING TOOL.
TEST BOPE. TEST ALL RAMS, LINES AND VALVES. TEST HYDRIL.
TEST KELLY VALVES AND RIH AND IBOP, ALL OK. INSTALL WEAR
BUSHING. PICK UP 3 3/4" MILL AND 2 7/8" PAC DRILL PIPE FOR
CLEAN OUT TO LANDING COLLAR.
RIH W/ 2 1/2" PERF GUNS MW: 0.0
CONTINUE PICK UP 2 7/8" 10.4# PAC DRILL PIPE 137 JTS. MAKE
UP 9 5/8" CASING SCRAPER, RIH WITH 4 1/2" DRILL PIPE. TAG
LINER TOP @ 8561'. NO CEMENT AT LINER TOP, CONTINUE RIH,
TAG LANDING COLLAR @ 12974' DPM - 9 5/8" CASING SCRAPER @
8535'. TEST LINER LAP, OK. NO BLEED OFF. DISPLACE TO
CLEAN FILTERED SEAWATER BY REVERSE CIRCULATION. POH. SLIP
DRILL LINE. FINISH POH. LAY DOWN BHA. PICK UP 915' 2
1/2" ALPHA JET GUNS AND 545' OF BLANK - TOTAL 1460' - GUNS
LOAD 4 SPF 90 DEG PHASING. RIH WITH 33 STANDS OF 2 7/8"
DRILL PIPE.
- -.t'ED
R t ~~..
AUG 0 J \995
nit . GaS Cons. eomm\ss\on
~,~"
WELL DS 18-18
OPERATION:
RIG NABORS 2ES
PAGE: 7
03/22/95 ( 25)
TD:13062
PB:12974
03/23/95 ( 26)
TD:13062
PB:12974
03/24/95 ( 27)
TD:13062
PB:12974
SIGNATURE:
RUN 4.5" L-80 COMPLETION
MW: 0.0
CON'T TIH W/PERFORATING GUNS ON 2-7/8" DP. FILL DP EVERY
STAND. MU HALLIBURTON 9-5/8" CHAMP PACKER & JARS. INSTALL
FAS-FIL VALVE. RU T/RUN 4.5" DP. CONTINUE TIH W/2.5" PERF
GUNS. STOP @11886. CLOSE FAS-FIL VALVE. CONTINUE TIH. TAG
LANDING COLLAR @12974. PU 3'--POSITION BTTM SHOT @12970
DPM. SET PACKER. RU SURFACE LINES. SFTY MEETING W/CREW.
PRESS UP T/2500 PSI. FIRE GUNS. MONITOR BUBBLE BUCKET
F/INDICATION OF FLOW. VERY FEW BUBBLES OBSERVED. PERF
F/12970 T/11510 @ 4 SPF. 915' NET PERF. OPEN BY PASS.
REVERSE CIRC 1-1/2 DRILL PIPE VOL. 23 BBLS PUMP BEFORE
FLUID @ SURFACE. FLUID LEVEL BEFORE FIRING GUNS WAS @14
BBLS DOWN DP. PULL PKR FREE. MONITOR WELL. FLUID LOSS = 100
BBLS/HR. PULL WEAR BUSHING. MU LANDING JT. RIG UP T/RUN
COMP .
NU ADAPTER FLANGE MW: 0.0
CONTINUE RUNNING 4 1/2" COMPLETION. RAN TOTAL OF 202 JTS 4
1/2" L-80, TIW 9 5/8" X 4 1/2" HBBP PACKER, 3 MERLA 4 1/2"
X 1-1/2" GLM'S, CAMCO TRDP-4A SSSV, WLEG, XN NIPPLE, FMC
GEN 4 TUBING HANGER. SPACED OUT WLEG INTO XO BELOW LINER
HANGER. MU TORQUE 4000 FT-#. MU CONTROL LINE TO HANGER,
MU LANDING JOINT, LANDED HANGER, RILDS. REVERSED IN
SEAWATER TREATED W/ 25 GAL PER 100 BBLS COREXIT INHIBITOR,
TO PACKER. DROPPED BALL, SET PACKER. LEAK ON RUNNING
THREADS/HANGER NECK. BLED PRESSURE AND TESTED BACKSIDE, NO
LOSS. WILL TEST TUBING AND ANNULUS AFTER NU TREE. SET TWC
AND TESTED. ND BOPE, MU CONTROL LINE. NU ADAPTER FLANGE.
SBMS SEAL AND ADAPTER FLANGE NOT FITTING ONTO HANGER NECK
PROPERLY. FMC SERVICES HAND EN ROUTE TO INSPECT PARTS.
RELEASE RIG MW: 0.0
FMC HAND INSPECTED ADAPTER FLANGE, SBMS, HANGER NECK, ALL
PARTS, OK. API RING FOR FLANGE WAS R-54, NEEDED RX-54.
ONLY DIFFERENCE IS IN HEIGHT OF RING. CONTINUED TO NU
ADAPTER FLANGE AND TREE. TESTED TREE. PULLED TWC. TESTED
TUBING. NO LOSS. BLED TUBING PRESSURE. TESTED ANNULUS.
NO LOSS. BLED OFF TUBING PRESSURE AND SHEARED RP VALVE.
FREEZE PROTECTED W/ DIESEL TO 2200'. SECURED WELL, CLEANED
PITS. RELEASE RIG @ 1700 HRS ON 03/23/95. -
DATE:
(drilling superintendent)
- 'r" -...' £ D
Dr, " .
l' '---.
AUG 03 \995
DU . Gas cons. Commission
~-...~ ~
..._----.....
18-18
DESCRIPTION OF WORK COMPLETED
PRE SIDETRACK CTU CEMENT PLUG
2/5/95:
RIH & tagged PBTD at 10206' MD.
2/17/95:
Cement was pumped fullbore to Plug & Abandon the lower wellbore prior to Sidetracking:
MIRU & PT equipment. Loaded the wellbore w/Hot Seawater, then pumped 49 bbls of 13.7 ppg
cement to plug the lower wellbore & abandon the slotted liner interval located at:
10338 - 11482' MD (Z1)
Ref. Log: BHCS.
Followed cement w/73 bbls Seawater Flush, followed by 11 bbls Diesel, followed by Shutdown.
Pressured up to 2130 psi max squeeze pressure. Left estimated top of cement at 10109' MD.
Rigged down.
2/19/95 :
RIH & tagged cement at 9985' MD. PT P&A; failed. Rigged down.
2/21/95:
MIRU CTU & PT equipment. RIH w/CT & tagged top of cement at 102481 MD. Circulated Hot
Seawater, then PU CT & pumped 14 bbls of 13.5 ppg cement for P&A squeeze. Squeezed 8 bbls of
cement away & attained 2500 psi max squeeze pressure, but well would not hold squeeze pressure
above 1800 psi. POOH w/CT. Rigged down.
2/23/95:
PT tubing at 1650 psi/20 min; tested good. RIH & tagged up at 8988' MD. POOH w/bailer. RD.
2/24/95 2/26/95:
MIRU CTU & PT equipment. Circulated Slick Seawater into well & RIH w/CT milling BHA. Milled
cement from 8800' to 9950' MD & circulated clean. Lost circulation & stuck CT at 97301 MD.
Could not pull CT free. Cut CT at surface, then RIH w/cutter & cut the CT at 92001 MD. POOH
w/cutter & recovered 9200' of CT. PT tubing to 1500 psi. Left 530' of stuck CT fish w/BHA in
wellbore. Rigged down CTU. RIH w/tubing cutter & cut the 3-1/2" tubing at 8765' MD. POOH
w/cutter. Rigged down.
Left the lower well bore Plugged & Abandoned w/cut tubing for Sidetracking.
~t ~~~·:ED
AUG 0 3 1995
~ ÐU j, Gas Cons. CommtsslOn
---.....1ncJøagI I
. Sl
-7'/T'- ((j
_RY-SUN DRILLING SERVICES )' PAGE
ANCHORAGE ALASKA 0 e I G ¡ i\/ /1 f
DATE OF SURVEY: 03j8~~i
MWD SURVEY ~...
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
9730
9731
9889
9920
9952
10076
10170
10265
10360
10452
10484
10516
10560
10652
10746
10841
10935
11031
11122
11218
11311
11343
11371
11402
11434
11465
11495
11528
11559
11591
11621
11652
11684
11715
11746
8524.00
8524.29
8560.55
8565.20
8568.86
8577.53
8580.51
8584.10
8590.31
8596.38
8597.87
8599.39
8602.55
8610.44
8618.13
8625.60
8632.80
8640.38
8646.83
8652.93
8658.90
8660.77
8662.29
8664.02
8666.08
8668.27
8670.29
8672.22
8672.84
8672.28
8671.99
8672.15
8672.57
8673.11
8674.30
8475.78
8476.07
8512.33
8516.98
8520.64
8529.31
8532.29
8535.88
8542.09
8548.17
8549.65
8551.17
8554.33
8562.22
8569.91
8577.38
8584.58
8592.16
8598.61
8604.71
8610.68
8612.55
8614.07
8615.80
8617.86
8620.05
8622.07
8624.00
8624.62
8624.06
8623.77
8623.93
8624.35
8624.89
8626.08
COURS
INCLN
DG MN
73 14
73 16
80 11
82 33
84 19
87 39
88 42
86 57
85 32
86 53
87 47
86 46
84 57
85 12
85 24
85 34
85 38
85 18
86 34
86 8
86 30
86 48
87 0
86 35
86 0
85 54
86 24
86 54
90 48
91 11
89 54
89 30
89 0
89 0
86 35
1
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
N 23.92 W
N 23.97 W
N 31.36 W
N 31.63 W
N 34.00 W
N 36.13 W
N 36.13 W
N 35.12 W
N 33.13 W
N 32.26 W
N 32.12 W
N 31.37 W
N 30.13 W
N 30.28 W
N 29.95 W
N 30.05 W
N 29.54 W
N 29.44 W
N 29.04 W
N 28.79 W
.00
6.26
6.31
7.63
9.20
3.19
1.12
2.13
2.57
1.74
2.85
3.93
5.00
.32
.40
.22
.54
.37
1.46
.52
N 30.30 W 1.67
N 27.10 W 10.03
N 24.40 W 9.66
N 21.30 W 10.07
N 18.00 W 10.46
N 14.80 W 10.30
N 11.70 W 10.44
N 8.90 W 8.60
N 6.20 W 15.30
N 3.40 W 8.84
N 2.10 W
N .70 W
N .80 E
N 2.10 E
N 3.50 E
MICROFll
Date --l- / 3/ /) I
1 1 ·
E···IJ):····.···\:·.··
. ~ :J-
~.: r~
, f-.~ A:__
6.13
4.70
4.94
4.19
8.96
2410.65N
2411.53N
2547.48N
2573.61N
2600.32N
2701.54N
2777.42N
2854.58N
2933.03N
3010.28N
3037.33N
3064.51N
3102.22N
3181.44N
3262.48N
3344.49N
3425.83N
3509.13N
3588.33N
3672.19N
3752.92N
3780.94N
3806.12N
3834.64N
3864.71N
3894.37N
3923.50N
3955.91N
3986.63N
4018.51N
4048.47N
4079.45N
4111.45N
4142.43N
4173.37N
1055.90W
1056.29W
1127.72W
1143.73W
1160.96W
1232.01W
1287.40W
1342.69W
1395.86W
1445.44W
1462.47W
1479.29W
1501.72W
1547.84W
1594.84W
1642.19W
1688.77W
1735.88W
1780.21W
1826.53W
1872.30W
1887.63W
1899.78W
1911.80W
1922.53W
1931.26W
1938.12W
1944.01W
1948.08W
1950.76W
1952.20W
1952.96W
1952.93W
1952.15W
1950.63W
RECE\VED
APR 1·j 1995
At'ska Oil &. Gas Cons. Commission
a I\flchùrage
VERT.
SECT.
1323.27
1323.74
1391.36
1403.01
1414.42
1454.22
1482.79
1512.46
1544.43
1577.55
1589.34
1601.36
1618.57
1655.32
1693.01
1731.29
1769.48
1808.93
1846.72
1887.09
1925.27
1938.84
1952.01
1967.94
1985.88
2004.68
2024.15
2046.84
2069.24
2093.40
2116.74
2141.31
2167.16
2192.64
2218.51
~,
~ S_ _RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
11778
11808
11840
11871
11903
11943
11975
12007
12037
12069
12101
12133
12164
12195
12227
12258
12290
12322
12353
12384
12416
12447
12479
12511
12543
12572
12602
12633
12665
12696
12728
12759
12790
12829
12860
8676.20
8677.63
8677.95
8677.45
8676.96
8676.86
8676.93
8676.89
8677.09
8677.49
8677.91
8678.31
8678.58
8678.58
8678.35
8678.09
8677.78
8677.58
8677.25
8676.48
8675.33
8674.10
8672.92
8671.96
8671.37
8671.15
8671.03
8670.99
8671.04
8671.11
8671.20
8671.30
8671.32
8671.10
8670.92
8627.98
8629.41
8629.73
8629.23
8628.74
8628.64
8628.71
8628.67
8628.87
8629.27
8629.69
8630.09
8630.37
8630.36
8630.13
8629.87
8629.56
8629.36
8629.03
8628.26
8627.11
8625.88
8624.70
8623.74
8623.15
8622.93
8622.81
8622.77
8622.82
8622.89
8622.98
8623.08
8623.10
8622.88
8622.70
COURS
INCLN
DG MN
86 35
87 57
90 51
91 0
90 46
89 30
90 14
89 54
89 19
89 15
89 13
89 20
89 37
90 24
90 24
90 34
90 31
90 12
91 0
91 50
92 16
92 16
91 57
91 30
90 36
90 14
90 12
89 56
89 52
89 52
89 46
89 50
90 5
90 33
90 7
PAGE 2
DATE OF SURVEY: 031895
MWD SURVEY
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
N 4.90 E 4.37
N 7.30 E 9.19
N 9.06 E 10.60
N 12.60 E 11.43
N 15.50 E 9.09
N 19.20 E 9.78
N 24.30 E 16.10
N 28.00 E 11.61
N 29.59 E 5.65
N 30.63 E 3.25
N 30.47 E
N 31.40 E
N 32.16 E
N 33.51 E
N 34.11 E
N 34.21 E
N 33.86 E
N 34. OlE
N 33.56 E
N 34.85 E
N 34.82 E
N 34.56 E
N 35.75 E
N 35.38 E
N 36.14 E
N 36.19 E
N 35.94 E
N 36.24 E
N 35.71 E
N 36.45 E
N 35.49 E
N 35.97 E
N 35.68 E
N 35.73 E
N 35.81 E
.51
2.93
2.61
5.01
1.88
.66
1.11
1.08
2.96
4.95
1.35
.84
3.84
1.84
3.66
1.29
.84
1.30
1.67
2.39
3.02
1.56
1.22
1.19
1.41
4205.22N
4235.02N
4266.69N
4297.12N
4328.16N
4366.33N
4396.04N
4424.76N
4451.05N
4478.73N
4506.29N
4533.73N
4560.08N
4586.13N
4612.71N
4638.36N
4664.88N
4691.43N
4717.19N
4742.82N
4769.07N
4794.54N
4820.68N
4846.70N
4872.66N
4896.07N
4920.32N
4945.37N
4971.27N
4996.32N
5022.22N
5047.39N
5072.52N
5104.19N
5129.34N
1948.29W
1945.11W
1940.56W
1934.73W
1926.97W
1915.04W
1903.19W
1889.09W
1874.64W
1858.59W
1842.32W
1825.87W
1809.55W
1792.74W
1774.94W
1757.53W
1739.62W
1721.76W
1704.52W
1687.10W
1668.83W
1651.20W
1632.79W
1614.19W
1595.49W
1578.38W
1560.72W
1542.46W
1523.66W
1505.40W
1486.61W
1468.51W
1450.36W
1427.60W
1409.48W
VERT.
SECT.
2245.61
2271.54
2299.79
2327.81
2357.45
2395.30
2426.28
2457.79
2487.54
2519.36
2551.20
2583.07
2613.97
2644.92
2676.89
2707.87
2739.85
2771.82
2802.79
2833.76
2865.73
2896.70
2928.67
2960.65
2992.65
3021.65
3051.65
3082.64
3114.64
3145.64
3177.64
3208.64
3239.64
3278.64
3309.64
,~
.. S_ _RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031895
MWD SURVEY
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
12892 8670.89 8622.67 89 58 N 35.86 E .49 5155.28N 1390.75W 3341.64
12924 8671.12 8622.90 89 13 N 36.86 E 3.89 5181.05N 1371.78W 3373.63
12955 8671.46 8623.24 89 30 N 36.17 E 2.40 5205.96N 1353.33W 3404.63
12986 8671.78 8623.56 89 17 N 36.24 E .75 5230.98N 1335.02W 3435.63
13062 8672.98 8624.76 88 54 N 36.20 E .52 5292.28N 1290.12W 3511.62
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5447.26 FEET
AT NORTH 13 DEG. 42 MIN. WEST AT MD 13062
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 36.16 DEG.
TIE IN POINT 9730'
WINDOW POINT 9731'
INTERPOLATED DEPTH 13062'
..---..,
S ~RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031895
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9730 8524.00 8475.78 2410.65 N 1055.90 W 1206.00
10730 8616.85 8568.63 3248.66 N 1586.88 W 2113.15 907.15
11730 8673.53 8625.31 4157.41 N 1951.51 W 3056.47 943.32
12730 8671.21 8622~99 5023.85 N 1485.45 W 4058.79 1002.32
13062 8672.98 8624.76 5292.28 N 1290.12 W 4389.02 330.23
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
, .
~ Sl RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031895
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9730 8524.00 8475.78 2410.65 N 1055.90 W 1206.00
9825 8548.22 8500.00 2493.61 N 1096.76 W 1277.42 71.42
11145 8648.22 8600.00 3608.62 N 1791.48 W 2497.03 1219.61
11170 8649.70 8601..48 3630.22 N 1803.47 W 2520.30 23.27
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
sr~~RY-SUN DRILLING SERVICES Q,_S~ (L( PAGE 1
ANCHORAGE ALASKA
SHARED SERVICES DRILLING DATE OF SURVEY: o(2¡rtr~
PBU/18-18A OH MWD SURVEY l)//1(
500292187270 JOB NUMBER: AK-MW-50016 I,,!)~
NORTH SLOPE BOROUGH KELLY BUSHING ELEV. = 48.22' T.
4/ 1/95 .....
COMPUTATION DATE: OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
9730 8524.00 8475.78 73 14 N 23.92 W .00 2410.65N 1055.90W 1323.27
9731 8524.29 8476.07 73 16 N 23.97 W 6.26 2411.53N 1056.29W 1323.74
9889 8560.55 8512.33 80 11 N 31.36 W 6.31 2547.48N 1127.72W 1391.36
9920 8565.20 8516.98 82 33 N 31.63 W 7.63 2573.61N 1143.73W 1403.01
9952 8568.86 8520.64 84 19 N 34.00 W 9.20 2600.32N 1160.96W 1414.42
10076 8577.53 8529.31 87 39 N 36.13 W 3.19 2701.54N 1232.01W 1454.22
10170 8580.51 8532.29 88 42 N 36.13 W 1.12 2777.42N 1287.40W 1482.79
10265 8584.10 8535.88 86 57 N 35.12 W 2.13 2854.58N 1342.69W 1512.46
10360 8590.31 8542.09 85 32 N 33.13 W 2.57 2933.03N 1395.86W 1544.43
10452 8596.38 8548.17 86 53 N 32.26 W 1.74 3010.28N 1445.44W 1577.55
10484 8597.87 8549.65 87 47 N 32.12 W 2.85 3037.33N 1462.47W 1589.34
10516 8599.39 8551.17 86 46 N 31.37 W 3.93 3064.51N 1479.29W 1601.36
10560 8602.55 8554.33 84 57 N 30.13 W 5.00 3102.22N 1501.72W 1618.57
10652 8610.44 8562.22 85 12 N 30.28 W .32 3181.44N 1547.84W 1655.32
10746 8618.13 8569.91 85 24 N 29.95 W .40 3262.48N 1594.84W 1693.01
10841 8625.60 8577.38. 85 34 N 30.05 W .22 3344.49N 1642.19W 1731.29
10935 8632.80 8584.58 85 38 N 29.54 W .54 3425.83N 1688.77W 1769.48
11031 8640.38 8592.16 85 18 N 29.44 W .37 3509.13N 1735.88W 1808.93
11122 8646.83 8598.61 86 34 N 29.04 W 1.46 3588.33N 1780.21W 1846.72
11218 8652.93 8604.71 86 8 N 28.79 W .52 3672.19N 1826.53W 1887.09
11310 8659.60 8611.38 85 33 N 28.67 W .65 3752.65N 1870.64W 1926.03
11342 8662.01 8613.79 85 49 N 29.83 W 3.71 3780.49N 1886.23W 1939.31
11374 8664.03 8615.81 86 55 N 28.34 W . 5.80 3808.40N 1901.75W 1952.68
11406 8665.14 8616.92 89 4 N 26.87 W 8.14 3836.73N 1916.57W 1966.82
11437 8665.27 8617.05 90 27 N 24.58 W 8.62 3864.66N 1930.03W 1981.42
11468 8664.93 8616.71 90 48 N 22.18 W 7.82 3893.10N 1942.32W 1997.13
11499 8664.49 8616.27 90 48 N 20.72 W 4.71 3921.95N 1953.66W 2013.74
11531 8663.99 8615.77 91 1 N 18.01 W 8.50 3952.13N 1964.27W 2031.85
11563 8663.56 8615.34 90 30 N 16.70 W 4.40 3982.67N 1973.81W 2050.87
11594 8663.34 8615.12 90 18 N 12.60 W 13.24 4012.66N 1981.65W 2070.45
11625 8663.07 8614.85 90 41 N 8.90 W 12.00 4043.11N 1987.43W 2091.63
11656 8662.72 8614.50 90 35 N 4.40 W 14.52 4073.89N 1991.02W 2114.36
llq88 8662.92 8614.70 88 41 N 2.30 W 8.85 4105.83N 1992.89W 2139.05
11719 8664.08 8615.86 87 0 N 1.00 E 11.97 4136.80N 1993.24W 2163.84
11751 8665.98 8617.76 86 11 N 5.00 E 12.73 4168.69N 1991.57W 2190.58
MICROFILMErw RECEIVED
APR 1 ~ 1995
Date-43!OJ Alaska Oil & Gas Cons. Commission
Anchorage
>:.'"
JS¿ ~RY -SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/18-18A OH
500292187270
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031095
MWD SURVEY
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/I00 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11783 8668.21 8619.99 85 48 N 9.20 E 13.15 4200.36N 1987.62W 2218.48
11814 8670.70 8622.48 85 0 N 12.00 E 9.37 4230.73N 1981.94W 2246.35
11846 8673.96 8625.74 83 18 N 14.70 E 9.93 4261.70N 1974.59W 2275.69
11878 8678.19 8629.97 81 30 N 17.30 E 9.82 4292.19N 1965.85W 2305.46
11908 8682.29 8634.07 82 48 N 20.30 E 10.81 4320.32N 1956.28W 2333.82
11952 8686.66 8638.44 85 48 N 23.50 E 9.94 4360.93N 1939.95W 2376.25
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4772.96 FEET
AT NORTH 23 DEG. 58 MIN. WEST AT MD = 11952
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 36.16 DEG.
TIE IN POINT 9730'
WINDOW POINT 9731'
INTERPOLATED DEPTH 11952'
, ,
~
... S .<'RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU/18-18A OH
500292187270
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031095
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9730 8524.00 8475.78 2410.65 N 1055.90 W 1206.00
10730 8616.85 8568.63 3248.66 N 1586.88 W 2113.15 907.15
11730 8664.68 8616.46 4147.78 N 1992.92 W 3065.32 952.17
11952 8686.66 8638.44 4360.93 N 1939.95 W 3265.34 200.02
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
/-......."."':...
~s ~RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
SHARED SERVICES DRILLING
PBU/18-18A OH
500292187270
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031095
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9730 8524.00 8475.78 2410.65 N 1055.90 W 1206.00
9825 8548.22 8500.00 2493.61 N 1096.76 W 1277.42 71.42
11145 8648.22 8600.00 3608.62 N 1791.48 W 2497.03 1219.61
11170 8649.70 8601.48 3630.22 N 1803.47 W 2520.30 23.27
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
--- '
u I.J/rc
-/: ! ~ "'\ i ..
J I ; ~o. ! / /
'JJI: I¡
I ¡ if /<1 /
: ;:
~ ~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
9730
9731
9889
9920
9952
10076
10170
10265
10360
10452
10484
10516
10560
10652
10746
10841
10935
11031
11122
11218
11311
11343
11371
11402
11434
11465
11495
11528
11559
11591
11621
11652
11684
11715
11746
8524.00
8524.29
8560.55
8565.20
8568.86
8577.53
8580.51
8584.10
8590.31
8596.38
8597.87
8599.39
8602.55
8610.44
8618.13
8625.60
8632.80
8640.38
8646.83
8652.93
8658.90
8660.77
8662.29
8664.02
8666.08
8668.27
8670.29
8672.22
8672.84
8672.28
8671.99
8672.15
8672.57
8673.11
8674.30
8475.78
8476.07
8512.33
8516.98
8520.64
8529.31
8532.29
8535.88
8542.09
8548.17
8549.65
8551.17
8554.33
8562.22
8569.91
8577.38
8584.58
8592.16
8598.61
8604.71
8610.68
8612.55
8614.07
8615.80
8617.86
8620.05
8622.07
8624.00
8624.62
8624.06
8623.77
8623.93
8624.35
8624.89
8626.08
COURS
INCLN
DG MN
73 14
73 16
80 11
82 33
84 19
87 39
88 42
86 57
85 32
86 53
87 47
86 46
84 57
85 12
85 24
85 34
85 38
85 18
86 34
86 8
86 30
86 48
87 0
86 35
86 0
85 54
86 24
86 54
90 48
91 11
89 54
89 30
89 0
89 0
86 35
.-."
PAGE
1
DATE OF SURVEY: 031895
MWD SURVEY
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
.00
6.26
6.31
7.63
9.20
3.19
1.12
2.13
2.57
1.74
2.85
3.93
5.00
.32
.40
.22
.54
.37
1.46
.52
N 30.30 W 1.67
N 27.10 W 10.03
N 24.40 W 9.66
N 21.30 W 10.07
N 18.00 W 10.46
N 14.80 W 10.30
N 11.70 W 10.44
N 8.90 W 8.60
N 6.20 W 15.30
N 3.40 W 8.84
6.13
4.70
4.94
4.19
8.96
MICROFILi0JÍD
nate-43/ DI
,
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
N 23.92 W
N 23.97 W
N 31.36 W
N 31.63 W
N 34.00 W
N 36.13 W
N 36.13 W
N 35.12 W
N 33.13 W
N 32.26 W
N 32.12 W
N 31.37 W
N 30.13 W
N 30.28 W
N 29.95 W
N 30.05 W
N 29.54 W
N 29.44 W
N 29.04 W
N 28.79 W
N 2.10 W
N .70 W
N .80 E
N 2.10 E
N 3.50 E
2410.65N
2411.53N
2547.48N
2573.61N
2600.32N
2701.54N
2777.42N
2854.58N
2933.03N
3010.28N
3037.33N
3064.51N
3102.22N
3181.44N
3262.48N
3344.49N
3425.83N
3509.13N
3588.33N
3672.19N
3752.92N
3780.94N
3806.12N
3834.64N
3864.71N
3894.37N
3923.50N
3955.91N
3986.63N
4018.51N
4048.47N
4079.45N
4111.45N
4142.43N
4173.37N
R- '~" '.... ~.~ E D
t ~e-".
AUG 0 3 1995
1055.90W
1056.29W
1127.72W
1143.73W
1160.96W
1232.01W
1287.40W
1342.69W
1395.86W
1445.44W
1462.47W
1479.29W
1501.72W
1547.84W
1594.84W
1642.19W
1688.77W
1735.88W
1780.21W
1826.53W
1872.30W
1887.63W
1899.78W
1911.80W
1922.53W
1931.26W
1938.12W
1944.01W
1948.08W
1950.76W
1952.20W
1952.96W
1952.93W
1952.15W
1950.63W
AlaØa VU i. Gas Cons. Commission
··t ~choragø
VERT.
SECT.
1323.27
1323.74
1391.36
1403.01
1414.42
1454.22
1482.79
1512.46
1544.43
1577.55
1589.34
1601.36
1618.57
1655.32
1693.01
1731.29
1769.48
1808.93
1846.72
1887.09
1925.27
1938.84
1952.01
1967.94
1985.88
2004.68
2024.15
2046.84
2069.24
2093.40
2116.74
2141.31
2167.16
2192.64
2218.51
--/~
3} _RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
11778
11808
11840
11871
11903
11943
11975
12007
12037
12069
12101
12133
12164
12195
12227
12258
12290
12322
12353
12384
12416
12447
12479
12511
12543
12572
12602
12633
12665
12696
12728
12759
12790
12829
12860
8676.20
8677.63
8677.95
8677.45
8676.96
8676.86
8676.93
8676.89
8677.09
8677.49
8677.91
8678.31
8678.58
8678.58
8678.35
8678.09
8677.78
8677.58
8677.25
8676.48
8675.33
8674.10
8672.92
8671.96
8671.37
8671.15
8671.03
8670.99
8671.04
8671.11
8671.20
8671.30
8671.32
8671.10
8670.92
8627.98
8629.41
8629.73
8629.23
8628.74
8628.64
8628.71
8628.67
8628.87
8629.27
8629.69
8630.09
8630.37
8630.36
8630.13
8629.87
8629.56
8629.36
8629.03
8628.26
8627.11
8625.88
8624.70
8623.74
8623.15
8622.93
8622.81
8622.77
8622.82
8622.89
8622.98
8623.08
8623.10
8622.88
8622.70
COURS
INCLN
DG MN
86 35
87 57
90 51
91 0
90 46
89 30
90 14
89 54
89 19
89 15
89 13
89 20
89 37
90 24
90 24
90 34
90 31
90 12
91 0
91 50
92 16
92 16
91 57
91 30
90 36
90 14
90 12
89 56
89 52
89 52
89 46
89 50
90 5
90 33
90 7
PAGE 2
DATE OF SURVEY: 031895
MWD SURVEY
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
N 4.90 E 4.37
N 7.30 E 9.19
N 9.06 E 10.60
N 12.60 E 11.43
N 15.50 E 9.09
N 19.20 E 9.78
N 24.30 E 16.10
N 28.00 E 11.61
N 29.59 E 5.65
N 30.63 E 3.25
N 30.47 E
N 31.40 E
N 32.16 E
N 33.51 E
N 34.11 E
N 34.21 E
N 33.86 E
N 34.01 E
N 33.56 E
N 34.85 E
N 34.82 E
N 34.56 E
N 35.75 E
N 35.38 E
N 36.14 E
N 36.19 E
N 35.94 E
N 36.24 E
N 35.71 E
N 36.45 E
N 35.49 E
N 35.97 E
N 35.68 E
N 35.73 E
N 35.81 E
.51
2.93
2.61
5.01
1.88
.66
1.11
1.08
2.96
4.95
1.35
.84
3.84
1.84
3.66
1.29
.84
1.30
1.67
2.39
3.02
1.56
1.22
1.19
1.41
4205.22N
4235.02N
4266.69N
4297.12N
4328.16N
4366.33N
4396.04N
4424.76N
4451.05N
4478.73N
4506.29N
4533.73N
4560.08N
4586.13N
4612.71N
4638.36N
4664.88N
4691.43N
4717.19N
4742.82N
4769.07N
4794.54N
4820.68N
4846.70N
4872.66N
4896.07N
4920.32N
4945.37N
4971.27N
4996.32N
5022.22N
5047.39N
5072.52N
5104.19N
5129f34N
.
1948.29W
1945.11W
1940.56W
1934.73W
1926.97W
1915.04W
1903.19W
1889.09W
1874.64W
1858.59W
1842.32W
1825.87W
1809.55W
1792.74W
1774.94W
1757.53W
1739.62W
1721.76W
1704.52W
1687.10W
1668.83W
1651.20W
1632.79W
1614.19W
1595.49W
1578.38W
1560.72W
1542.46W
1523.66W
1505.40W
1486.61W
1468.51W
1450.36W
1427.60W
1409.48W
R (-- --. -: E D
AUG 0 3 1995
à\a.$a Dll i Gas Cons. CAmmissmn
----~ InchGrage ,;
VERT.
SECT.
2245.61
2271.54
2299.79
2327.81
2357.45
2395.30
2426.28
2457.79
2487.54
2519.36
2551.20
2583.07
2613.97
2644.92
2676.89
2707.87
2739.85
2771.82
2802.79
2833.76
2865.73
2896.70
2928.67
2960.65
2992.65
3021.65
3051.65
3082.64
3114.64
3145.64
3177.64
3208.64
3239.64
3278.64
3309.64
·--'
. 81 ~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031895
MWD SURVEY
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
12892 8670.89 8622.67 89 58 N 35.86 E .49 5155.28N 1390.75W 3341.64
12924 8671.12 8622.90 89 13 N 36.86 E 3.89 5181.05N 1371.78W 3373.63
12955 8671.46 8623.24 89 30 N 36.17 E 2.40 5205.96N 1353.33W 3404.63
12986 8671.78 8623.56 89 17 N 36.24 E .75 5230.98N 1335.02W 3435.63
13062 8672.98 8624.76 88 54 N 36.20 E .52 5292.28N 1290.12W 3511.62
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5447.26 FEET
AT NORTH 13 DEG. 42 MIN. WEST AT MD = 13062
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 36.16 DEG.
TIE IN POINT 97301
WINDOW POINT 97311
INTERPOLATED DEPTH 130621
RE -"~':ED
AUG 0 3 1995
AlaSu Dil.' Gas Cons. Commission
.: Anchorage
Rf --&"E· D
-~ .' "
AUG 03 \995
~ OU, Gas Cons. CQmmlss\An
'--.\.~'
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9730 8524.00 8475.78 2410.65 N 1055.90 W 1206.00
10730 8616.85 8568.63 3248.66 N 1586.88 W 2113.15 907.15
11730 8673.53 8625.31 4157.41 N 1951.51 W 3056.47 943.32
12730 8671.21 8622,99 5023.85 N 1485.45 W 4058.79 1002.32
13062 8672.98 8624.76 5292.28 N 1290.12 W 4389.02 330.23
DATE OF SURVEY: 031895
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARca ALASKA INC
PAGE 4
S... ~RY -SUN DRILLING SERVICES
ANCHORAGE ALASKA
, >
--.-
, $) RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
SHARED SERVICES DRILLING
PBU/18-18A
500292187201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031895
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9730 8524.00 8475.78 2410.65 N 1055.90 W 1206.00
9825 8548.22 8500.00 2493.61 N 1096.76 W 1277.42 71.42
11145 8648.22 8600.00 3608.62 N 1791.48 W 2497.03 1219.61
11170 8649.70 8601..48 3630.22 N 1803.47 W 2520.30 23.27
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
IrE ":';£0
AUG 03 1995
a~~=";MMIdIft1I
2091.63
2114.36
2139.05
2163.84
2190.58
1997.13
2013.74
2031.85
2050.87
2070.45
1926.03
1939.31
1952.68
1966.82
1981.42
1731.29
1769.48
1808.93
1846.72
1887.09
1589.34
1601.36
1618.57
1655.32
1693.01
1454.22
1482.79
1512.46
1544.43
1577.55
1323.27
1323.74
1391.36
1403.01
1414.42
R 11-.1.0 -.. · "'1 E D
f. ,¡.. ~ f
AUG 0 3 1995
~=~mmis&1m1
1987.43W
1991.02W
1992.89W
1993.24W
1991.57W
1942.32W
1953.66W
1964.27W
1973.81W
1981.65W
1870.64W
1886.23W
1901.75W
1916.57W
1930.03W
1642.19W
1688.77W
1735.88W
1780.21W
1826.53W
1462.47W
1479.29W
1501.72W
1547.84W
1594.84W
1232.01W
1287.40W
1342.69W
1395.86W
1445.44W
1055.90W
1056.29W
1127.72W
1143.73W
1160.96W
4043.11N
4073.89N
4105.83N
4136.80N
4168.69N
3893.10N
3921.95N
3952.13N
3982.67N
4012.66N
3752.65N
3780.49N
3808.40N
3836.73N
3864.66N
3344.49N
3425.83N
3509.13N
3588.33N
3672.19N
3037.33N
3064.51N
3102.22N
3181.44N
3262.48N
2701.54N
2777.42N
2854.58N
2933.03N
3010.28N
2410.65N
2411.53N
2547.48N
2573.61N
2600.32N
MI(ROFILt~~~
Oate~
N 8.90 W 12.00
N 4.40 W 14.52
N 2.30 W 8.85
N 1.00 E 11.97
N 5.00 E 12.73
N 22.18 W 7.82
N 20.72 W 4.71
N 18.01 W 8.50
N 16.70 W 4.40
N 12.60 W 13.24
.65
3.71
5.80
8.14
8.62
.22
.54
.37
1.46
.52
2.85
3.93
5.00
.32
.40
3.19
1.12
2.13
2.57
1.74
.00
6.26
6.31
7.63
9.20
N 28.67 W
N 29.83 W
N 28.34 W
N 26.87 W
N 24.58 W
N 30.05 W
N 29.54 W
N 29.44 W
N 29.04 W
N 28.79 W
N 32.12 W
N 31.37 W
N 30.13 W
N 30.28 W
N 29.95 W
N 36.13 W
N 36.13 W
N 35.12 W
N 33.13 W
N 32.26 W
N 23.92 W
N 23.97 W
N 31.36 W
N 31.63 W
N 34.00 W
VERT.
SECT.
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/I00 NORTH/SOUTH EAST/WEST
DATE OF SURVEY: 031095
MWD SURVEY
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
PAGE 1
() ;"" r c')' ("'t.- (
90 41
90 35
88 41
87 0
86 11
90 48
90 48
91 1
90 30
90 18
85 33
85 49
86 55
89 4
90 27
8614.85
8614.50
8614.70
8615.86
8617.76
8616.71
8616.27
8615.77
8615.34
8615.12
8611.38
8613.79
8615.81
8616.92
8617.05
8577.38. 85 34
8584.58 85 38
8592.16 85 18
8598.61 86 34
8604.71 86 8
87 47
86 46
84 57
85 12
85 24
87 39
88 42
86 57
85 32
86 53
73 14
73 16
80 11
82 33
84 19
COURS
INCLN
DG MN
8549.65
8551.17
8554.33
8562.22
8569.91
8529.31
8532.29
8535.88
8542.09
8548.17
8475.78
8476.07
8512.33
8516.98
8520.64
8663.07
8662.72
8662.92
8664.08
8665.98
8664.93
8664.49
8663.99
8663.56
8663.34
8659.60
8662.01
8664.03
8665.14
8665.27
8625.60
8632.80
8640.38
8646.83
8652.93
8597.87
8599.39
8602.55
8610.44
8618.13
8577.53
8580.51
8584.10
8590.31
8596.38
8524.00
8524.29
8560.55
8565.20
8568.86
11625
11656
11688
11719
11751
11468
11499
11531
11563
11594
11310
11342
11374
11406
11437
10841
10935
11031
11122
11218
10484
10516
10560
10652
10746
10076
10170
10265
10360
10452
9730
9731
9889
9920
9952
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
SHARED SERVICES DRILLING
PBU/18-18A OH
500292187270
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
S~'RRY-SUN DRILLING SERVICES /.-.
. ·ANCHORAGE ALASKA
~.
S ARRY~SÚN DRILLING SERVICES
ANCHORAGE ALASKA
SHARED SERVICES DRILLING
PBU/18-18A OH
500292187270
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
11783
11814
11846
11878
11908
8668.21
8670.70
8673.96
8678.19
8682.29
8619.99
8622.48
8625.74
8629.97
8634.07
85 48
85 0
83 18
81 30
82 48
PAGE 2
DATE OF SURVEY: 031095
MWD SURVEY
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. ~ 48.22 FT.
OPERATOR: ARCO ALASKA INC
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/I00 NORTH/S01rH EAST/WEST
N 9.20 E 13.15 4200.36N 1987.62W
N 12.00 E 9.37 4230.73N 1981.94W
N 14.70 E 9.93 4261.70N 1974.59W
N 17.30 E 9.82 4292.19N 1965.85W
N 20.30 E 10.81 4320.32N 1956.28W
VERT.
SECT.
2218.48
2246.35
2275.69
2305.46
2333.82
11952 8686.66 8638.44 85 48 N 23.50 E 9.94
4360.93N 1939.95W 2376.25
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4772.96 FEET
AT NORTH 23 DEG. 58 MIN. WEST AT MD = 11952
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 36.16 DEG.
TIE IN POINT 9730'
WINDOW POINT 9731'
INTERPOLATED DEPTH 11952'
..
.
..
DE -·~rED
~ ....···....1 J. I
AUG 0 3 1995
6IiiU W, Gas Cons. CmnmI~D
~ IRcIWJQs,'
...-=c-.z....,__
s_ .KRY~SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU/18-18A OH
500292187270
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
DATE OF SURVEY: 031095
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9730 8524.00 8475.78 2410.65 N 1055.90 W 1206.00
10730 8616.85 8568.63 3248.66 N 1586.88 W 2113.15 907.15
11730 8664.68 8616.46 4147.78 N 1992.92 W 3065.32 952.17
11952 8686.66 8638.44 4360.93 N 1939.95 W 3265.34 200.02
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
.
AUG 0 3 1995
AliSA UU , Gas Cons. Commission
...¡ lnœDraQe
!
R ~ -. II " E D
t s,,"=" .
.
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9730 8524.00 8475.78 2410.65 N 1055.90 W 1206.00
9825 8548.22 8500.00 2493.61 N 1096.76 W 1277.42 71.42
11145 8648.22 8600.00 3608.62 N 1791.48 W 2497.03 1219.61
11170 8649.70 8601.48 3630.22 N 1803.47 W 2520.30 23.27
DATE OF SURVEY: 031095
SHARED SERVICES DRILLING
PBU/18-18A OH
500292187270
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 1/95
JOB NUMBER: AK-MW-50016
KELLY BUSHING ELEV. = 48.22 FT.
OPERATOR: ARCO ALASKA INC
PAGE 4
~ RRY~SUN DRILLING SERVICES
ANCHORAGE ALASKA
~".
~
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
Well
Job #
log Description
7/31/95
NO. 9602
Company: . Alaska Oil & Gas Cons Comm
AUn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay
Floppy
Date BL RF Sepia DIR MWD Disk
950712 1 1 )
950710 1 1
950711 1 1
950710 1 1
950712 1 1
950712 1 1
950710 1 1
950708 1 1
950707 1 1
) D.S. 1-3 71) IY V, lEAK DETECTION
D.S. 1-33 ".-'.Y'{" I 2-2-- PROD lOG
D.S. 3-34A Ó1 "1 _ (J 1 V INJEC PROAlE
D.S. 4-01 ') (\ t)'-I ~_ PROD lOG
D.S. 16-21 r; ~ <3 J 'L- BAKER INFLATABLE
D.S. 16-29A q'i- ()(n fA PERF RECORD
D.S. 18-3A c;¡/ / I..., _ DUAlBURSTTDT-P
D.S. 18-3A f -¡ I U z.;;;. PROD PROFilE
D.S.18-18A ú":::- () I L/ DUALBURSTTDT-P
( ,
...
I
--L.
-~-------------
.~ ~('I:
1f~ 4VQ' IVr-
W cf 0 I '. <¥)
6'~ Lth..
~I)(};.'$ Cú~ ""'"$
'IO~ ð'
~c9 . co~
~~8h
~~
ign and return one copy of this transmittal to Sherrie at the above address. Thank you.
~
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATIN: Sherrie
7/27/95
Alaska Oil & Gas Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
Field:
Prudhoe Bay
Well
Job #
Log Description
Date
BL
Floppy
RF Sepia . DIR MWD Disk
'.)
. -
D.S. 2~13A Ct:'i-: "of.'-"" ,::." l.,~(' PRODUCTION PROFILE. 950701 1 1
D.S. 2~34 (]. I\.IG' DUAL BURST TDT-P 950702 1 1
D.S. 5-10A Cf'L¡ U V· . PRODUCTION PROFILE 950703 1 1
D.S. 6-17 ~ '-z....: ' c,- Ð PRODUCTION PROFILE 950706 1 1
D.S. 7-13A ~U I ("') ~ DUAL BURSTTDT-P 950704 1 " 1 '\
0.5. 7-16 ~I~ , )(---z.- INJECTION PROFILE 950704 1 1 \
D.S. 7-33 .... ~ Ÿ' 4~ INJECTION PROFILE 950702 1 1
D.S. 7-33 ~ ,- I TEMPERATURE SURVEY 950702 1 1
D.S. 7~33 ) ) STATIC PRESSURE SURVEY 950702 1 1
D.S. 7-34 ~~ ~? TDT-P BORAX 950702 1 1
D.S. 7-34 ,/ I INJECTION PROFILE 950704 1 1
D.S. 7-34 ') ì TEMPERATURE SURVEY 950702 1 1
D.S. 11-31 ~L\ , "L-'1 PERFORATING RECORD 950707 1 1
D.S. 11-32 'q L\ t ~.\. PERFORATING RECORD 950707 1 1
D.S. 14-3 -¡'y <"1_____ INFLATABLE BRIDGE PLUG 950705 1 1
D.S. 18~18A ·c:,- ~ILI PRODUCTION PROFILE 950706 1 1
D.S. 18-18A I J .- .......95~47 TOT -P 950707 1
^
1\1 r~
.... l ¡: II
~ CI{¡· ...., VJ
(/
'''-...
SIGNED:
-- --- -- - -- - - - ~-----
~.fq~ ~ ~;>IJ ff)
If G'q$'1c96
~I)CI- C~
'IO~ 19. Q
DA TE1?6' O/)¡~.
~/O~
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
spe,.-,,.-,v-sur I
CRILLINCi seRVices
April 11, 1995
AOGCC
Larry Grant
3001 Porcupine Dr
Anchorage, AK 99501
Re: Survey Data - 18-18A, 18-180R
Dear Mr. Grant,
Enclosed are two hard copies of the MWD survey ( s).
Well 18-18A
Redistributing data, please destroy data sent on April 4th, well name and API
number was incorrect. 18-18A ST is correctly renamed 18-18A. Tie in point
9730' kick off point 9731' interpolated depth 13062'
Well 18-18AOH Redistributing data, please destroy data sent on April 4th, well name and API
number was incorrect. 18-18A is correctly renamed 18-18A OR. Tie in point
9730' kick off point 9731' interpolated depth 11952'
Please call me at 563-3256 if you have any questions.
Sincerely,
i~~'
RECEIVED
APR 1.) 1995
Sandra Lufkin
Re gion Assistant
Aiaska Oil & Gas Cons. Commission
Anchorage
Enclosures.
5631 Silverado Way, Suite G . Anchorage, Alaska 99518 . (9.07) 563-3256 . Fax (907) 563-7252
A Dresser Industries. Inc. Company
~~
5pe~~V-5ul ~
CRI LLI N G SERVI I::E 5
April 3, 1995
AOGCC
Larry Grant
3001 Porcupine Dr
Anchorage, AK 99501
Re: Survey Data - 18-18A, 18-18A ST
Dear Mr. Grant,
Enclosed are two hard copies of the MWD survey ( s).
Well 18-18A
Tie in point 9730", Kick off point 9731', Interpolated depth 11,952'
Well 18-18A ST Tie in point 9730', Kick off point 9731', Interpolated depth 13,062'
Please call me at 563-3256 if you have any questions.
Sincerel y,
1/
, )7~. ~
!^V~V~---
U
Sandra Lufkin
Re gion Assistant
RECEIVED
Enclosures.
APR q 1995
AJaska Oil & Gas Cons. Commission
Anchorage
5631 Silverado Way, Suite G . Anchorage, Alaska 99518 . (9,07) 563-3256 . Fax (907) 563-7252
A Dresser Industries, Inc. Company
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
David JOh~
Chairman
DATE:
March 11, 1995
THRU: Blair Wondzell, cß~
P. I. Supervisor 3{ I/'
FROM: Lou Grimaldi,~
Petroleum Inspector
FILE NO: AEMJCKCD.DOC
- ,
SUBJECT: BOP test
Nabors rig # 2 ES
Arco well # OS 18-18
Prudhoe Bay Field
PTO # 95-14
Saturday. March 11. 1995: I witnessed the weekly BOP test on Nabors rig # 2 ES which was
drilling Arco well # OS 18-18 in the Prudhoe Bay Field.
The test was started at 0900. A low/high test of 300/5000 psi was put on all BOPE with the
exception of the annular preventer which was tested to 300/3000 psi. A recharge test was
performed that showed the accumulator was in satisfactory shape. The choke manifold was
tested with all valves operating properly and holding their pressure test of 300/5000 psi.
The gas detection system was tested. All components functioned properly although the high
alarm on the methane detectors did not activate until 60% LEL. This was set to 50% in my
presence.
I found the condition of the rig to be in very good shape.
SUMMARY: I witnessed the weekly BOP test on Nabors rig # 2 ES drilling Arco well # OS 18-18.
Test time 3 1/2 hours, no failures.
Attachments: AEMJCKCO.XLS
: ;1
1
CC: Scott SigurdsonlTom Horten
OPERATION: Drlg:
Drlg Contractor:
Operator:
Well Name:
Casing Size:
Test: Initial
,-
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
X Workover:
Nabors
Arco Alaska
DS 18-18
Set@
Weekly X
DATE: 3/11/95
Rig Ph.# 659-4836
Robert French
Charlie Dickson
11N R. 14E Meridian
Umiat
Rig No. 2 ES PTD # 95-14
Rep.:
Rig Rep.:
Location: Sec. 19 T.
Other
Test
MISC. INSPECTIONS: FLOOR SAFETY VALVES: Quan. Pressure P/F
Location Gen.: OK Well Sign OK Upper Kelly IIBOP 1 300/5,000 P
Housekeeping: OK (Gen) Drl. Rig OK Lower Kelly IIBOP 1 300/5,000 P
PTD On Location OK Hazard Sec. NO Ball Type 1 300/5,000 P
Standing Order Posted OK Inside BOP 1 300/5,000 P
BOP STACK: Quan. Test Press. PIF Test
Annular Preventer 1 300/3,000 P CHOKE MANIFOLD: Pressure PIF
Pipe Rams 1 300/5,000 P No. Valves 14 300/5,000 P
Lower Pipe Rams 1 300/5,000 P No. Flanges 36 300/5,000 P
Blind Rams 1 300/5,000 P Manual Chokes 1 Functioned P
Choke Ln. Valves 1 300/5,000 P Hydraulic Chokes 1 Functioned P
HCR Valves 2 300/5,000 P
Kill Line Valves 1 300/5,000 P ACCUMULATOR SYSTEM:
Check Valve N/A 300/5,000 N/A System Pressure 3,000 ~
Pressure After Closure 1,700
MUD SYSTEM: Visual Alarm 200 psi Attained After Closure 0 minutes 29 sec.
Trip Tank OK OK System Pressure Attained 1 minutes 45 sec.
Pit Level Indicators OK OK Blind Switch Covers: Master: ok Remote: ok
Flow Indicator OK OK Nitgn. BtI's: four bottles
Meth Gas Detector OK P*( 1) 2100 average Psig.
H2S Gas Detector N/A N/A
Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested 20 Repair or Replacement of Failed
Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Good Test!
1) Gas detectors worked but audible did not sound until 60%.
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - I nSPFf-6~f L (Rev.12194)
STATE WITNESS REQUIRED?
YES X NO
Waived By:
Louis R Grimaldi
Witnessed By:
24 HOUR NOTICE GIVEN
YES X NO
M;,.,. CKCD.XLS
~~) ~IJ 11\\]' æ
~~l"t- ¡.(J
, i. t
i 'I j'
\,~~.1 IJ
[;\ i 'ì r;,-' {"^f\'" n/~ /-'
¡ l' \\ ¡! I', \ I, \"! t ~, \
!J \ I i \ '\,'''-,' ~ \
¡ L_' . f I--~ . " \ I >, t.1 1
if Ü L::-; ¿ \J {,"'J U \: Lr t\
í
f
/
/
/
I
J
í
TONY KNOWLES, GOVERNOR
ALASKA. OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501·3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
February 22, 1995
Terry Jordan, Drlg Engr Supv
ARC 0 Alaska Inc
POBox 196612
Anchorage, AK 99519-6612
Re: Well #
Company
Permit #
Surf Loc
Btmhole Loc
Prudhoe Bay Unit Drill Site 18-18A
ARCO Alaska Inc
95-14
4873'NSL, 205'EWL, Sec 19, T11N, R15E, UM
4663'NSL, 1167'WEL, See 13, T11N, R14E, UM
Dear Mr Jordan:
Enclosed is the approved application for permit to re-drill the above referenced well.
The permit to re-drill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting re-drilling operations
until all other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 MC 25.035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling a new hole. Notice may be given
by contacting the Commission's petroleum field inspector on the North Slope pager at 659-3607.
jo/encl
c: Dept of Fish & Game, Habitat Section - wlo encl
Dept of Environmental Conservation - wlo encl
STATE OF ALASKA
ALASKA O~,AND GAS CONSERVATION COMMISSION
//- JPER~~~l<?s.~5RILL
1 a. Type of work Drill 0 Re~~rb. Type of well. Exploratory 0 Stratigraphic Test 0 Development Oil @
Re-Entry 0 Dee 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 0
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. KBE = 46.8 feet Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612 Anchnraoe AIf1-~kf19.q519-6612 ADL 28307
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
4873' NSL, 205' EWL, SEC. 19, T11N, R15E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
4024' NSL, 1653' WELl SEC. 13, T11N, R14E 18-18A U-630610
At total depth 9. Approximate spud date Amount
4663' NSL, 1167' WEL, SEC. 13, T11N, R14E 2/25/95 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property 15. Proposed depth (MO and TVO)
property line feet 12809' MD/8707' TVD feet
ADL 28321-1167' feet No close approach 2560
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2»
Kickoff depth 9730 feet Maximum hole angle 9 0 o Maximum surface 3330 psig At total depth (TVO) RR()()' /4.':l9() psig
18. Casing program Specifications Setting Depth
size .. Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
6" 4-1/2" 12.6# L-80 NSCC 3229' 9580' 8010' 12809' 8707' 180 sx Class "G"
F({ FIVFO
19. To be completed for Redrill, Re-entry, and Deepen Operations. ------.. ---
Present well condition summary FEB - 9 1995
Total depth: measured 11550 feet Plugs (measured)
true vertical 8709 feet Alaska OU & Gas Cons. Commission
Effective depth: measured N/A feet Junk (measured) Anchora c;
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
S t ru ct u ra I
Conductor 80' 20" 2150 # Poleset 110' 110'
Surface 3435' 13-3/8" 2200 sx cs III & 111600 sx "G" 3473' 3473'
Intermediate 8902' 9-5/8" 750 sx "G" 8935' 8258'
Production 8902' 7" 500 sx "G" 8605'-10317' 8090'-8667'
Liner 1281' 4-1/2" Slotted Liner 10244 '-11525' 8679'-8706'
Perforation depth: measured Slotted Liner Completion (10338'-11482')
true vertical
20. Attachments Filing fee [XI Property plat 0 BOP Sketch 0 Diverter Sketch 0 Drilling program ŒI
Drilling fluid program lliJ Time vs depth plot 0 Refraction analysis 0 Seabed report 0 20 AAC 25.050 requirements 0
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed~.v-L.i.~ A:;L 7l:PJ-.i JV£O·~J'Title Drilling EngineerSu/Jervisor Date ?-9-(.j'-
{ , Commission Use Only
permit9~umber API number /APprov.al d~ See cover letter
~ /.cy 50- 82-7 -.2../ ?'/2-ð I ;) I?-';;).. 7'S- for other requirements
Conditions of approval Samples required DYes ßlNo Mud log required o Yes -~ No
Hydrogen sulfide measures DYes ~No Directional survey required IðJ Yes DNo
Required working pressure for BOPE D2M; D3M; ~5M; D10M; D15M;
Other: Originaf Signed By
Approved by Commissioner by order of D atec2j2 I-}¡(~
Davirf W . f"fIIo,jnn - me commission
Form 1 0-401 Rev. 12-1-85
Submit In triplicate
I Well Name: IDS 18-18A
Redrill Plan Summary
I Type of Redrill (producer or injector): I Producer ' 1
Surface Location: 4873 FSL 205' FWL S19 TIIN RISE UM
Target Location: 4024 FSL 1634 FEL S13 TIIN R14E UM
Bottom Hole Location: 4663 FSL 1167 FEL S13 TIIN R14E UM
I AFE Number: I 4J0286
I Estimated Start Date: I Feb 25 1995 I
I MD: 112809' I TVD:
I Rig: 1 Nabors 2ES
I Operating days to complete: 1 20
I 8660 ss I KBE: 146.80'
I Well Design (conventional, slimhole, etc.):
I Horizontal Sidetrack.
Objective: The scope of the AFG at this time is defined by the following general plan:
Abandon the current slotted liner completion prior to arrival of the drilling
rig. Remove that portion of the existing 3-1/211 completion above the
production packer. Abandon the production packer and tubing tail
assembly in place. Mill away a section of the 711 liner above the abandoned
packer and tail assembly. Place cement below and across the previously
milled section to serve as a combination IIkick-offll/abandonment plug. Drill
a new 6" hole, exiting through the section and on to the proposed target,
as defined in the attached directional plan (plan #6). Use a real-time MWD
gamma ray log for geological correlation. Once the hole is inclined to
horizontal and reaches the target, acquire drillpipe-conveyed, electric line
formation evaluation logs for GaG identification. Exte30Q' to the proposed
bottom-hole location (BHL). Use only truly non-damaging drilling fluids
(FloPro®) in this interval. Gase and cement the hole with a 4-1/211 L-80
liner. Perforate the horizontal section with drillpipe conveyed 2-3/411 guns.
Finally, complete the well with 3-1/211 L-80 tubing.
Mud Program:
Special design
considerations
After dressing off the kickoff plug we will displace to KCL system
(Xanvis) and drill to TD with 9.0 ppg Flo-Pro mud.
Depth Density PV YP INT 10MIN FL OIL SOLIDS
(TVD) (PPG) (CP) ( #/FT) GEL GEL cc/30min (%) (%)
KOP' 9.00 10 43 22 29 6 0 3
RECEIVED
FEB - 9 1995
Alaska Oil & ..Ga~ Cons. Commission
..~
to
6
Directional:
90
NONE
Casing/Tubing Program:
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MD/TVD MD/TVD
6" 4.5" 12.6# L-80 nscc 3229 9580/8010 12809/8707
N/A 3.5" 9.3# L-80 nscc 9000 Surface 9000/8296
Cement Calculations:
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular pre venter
will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
Reservoir data:
Top of first sand to be encountered while drilling will be Sag River which is in communication
with Sadlerochit that has the following pore pressure and temperature:
BHP: 3545 psi @ 8600' SS
BHT: 1830 F @ 8600' SS
7.92 ppg EMW
Estimated
Estimated
Lost circulation is not expected in this well.
Hazards and Contingency Plans:
I· No hazards are expected in this well.
RECEIVED
FEB - 9 1995
AIÉ1~ka Oil & Gas Cons. Commission
Anchora q
~
SUMMARY PROCEDURE:
1. Pre-rig work: P&A well and cut 3.5" tubing.Set and test BPV.
2. Move in drilling rig. Test 9-5/811 intermediate casing pack-off .
3. Pull BPV. Circulate diesel freeze protection cap from well and recover for
future use.
4. Install a BPV and test tree plug. Remove the production tree.
5. Install BOP's and test to 250/5000 psi. Remove the test plug and BPV.
6. Pull and lay down the 3-1/211 tubing from the cut to surface.
7. P/U 7" section mill. RIH to ..... 200' below proposed 7'1 section.
8. Displace to milling fluid and spot a 18 ppg pill on bottom and cut a 50' section
in the 7" casing starting from about 9730' MD.
9. Spot a balanced cement kick-off plug (150 cubic feet minimum) through open-
ended drillpipe from 100' below the base of the section to 200' above the top
of the section.
10. Run in with a 611 steerable drilling assembly ( incl'd MWD / GR ) and dress the
cement to 5' below the section top. Prior to kickoff circulate hole clean so that
it is free of cement. Kickoff and directionally drill to the target with 89.28° hole
angle at 8650'ss as per the attached directional plan. Obtain GR / SP / DDL /
SONIC / CNL formation evaluation logs via drill pipe conveyed method. Make
cleanout run as needed and continue to drill 611 horizontal section to TD as per
enclosed directional plan. ( NOTE: Due to geological uncertainties it is likely
that we may have to plug back this well. Tatal estimated cost includes thia
plug back contigency )
11. Run a 4.511 12.6 # L-80 liner assembly to TD in the 611 hole. Space out liner top
packer/hanger @ 150' inside of 7 casing window.
12. Cement the liner in place with the total cement volume based upon 40 0/0
open-hole enlargement plus the 40' shoe volume, 1501 lap volume and 150'
excess on top of the liner with drillpipe in the hole. ( Note: if the caliper log is
available use it and add 20% to caliper volume)
13. P/U 3.87511 bit / mill ( use drilex motor) and clean-out 4.511 liner to top of
landing collar.
14. Displace well to SW. POOH.
15. P/U 2-3/411 guns and perforate 4.511 liner. (underbal. via drill pipe conveyed
method)
15. Install a BPV and test plug. Remove BOPls.
16. Run 3.511 completion as per program.
17. Release rig.
18. Complete appropriate documentation and hand-over to Production.
RE(EIVED
FEB - 9 1995
Aiaska Oil & Gas Cons. Commission
Anchora '~
I
PRUDHOE BAY DRILLING GROUP
r Anadrjll Schlumberger
-.- -.--.-.-. DS·t·8·-·!-8-A·-···· ·(PO 6)············· ..-...... -
VERTICAL SECTION .VIEW
.. . 8400
B
K
B 8700
,\
: 9300
.. ....., .. .. .
. ~~r.~~r. ld.(!OlU i.Ç¡;lJ.lQll ...... __. .MQ._...... .aKa _. s.~Ç.UL.....HJ~·u~ ,,___._,. __..... ....... ...._~.._. _.. ._ _.... __. _._",...,._.._ ._ ..._.. "_'" -_._"
A) TIE-IN 9130 8524 1323 73.?4
ß) END OF 6/jOO CURVE 9970 8567 1426 85.93
ct STAAT 10/tOO CURVE 11349 0665 1966 85.93
01 ----- lARGEr ----- 12028 6697 2493 89.28
[I END OF 10/100 CURVE 12018 8697 2493 89.28
F) TO 12809 8707 3283 a9.28
Section at: 36.16
TVO Scale.: .. inch = 300 feet
Dep Sca]e.: I inch = 300 feet
rì'awn. . . . .: 12/08/94
8100
i I i [
si!¡ R tytþ':" I ,
1«,a- - - . -----r----- --..--i----- ..---
~_n-l ~1' - .. - . - -... -- ~_.....- 100--..-- --.-- -- -- : i
...... .. . ..-... I I
,Nlmf! ~ru*e~7J . ... - - -- - - --... ..----- ..----- ...~ --
"'lrt€ f4),..., " - bT ,- -.....-- ... .. -..... -....--. ---..- - - --
"'.z~r :r - r. ß·",: - '''; . ....--- ----- .,
----- -..-..... ----
" I
"'.zfxr "/~-.1I.{4{" - '.:-.. .. ----- -----. ----- -- --
...
¡a"tr aJ"ïÑ~ - 1~" . - ~~-- ..-...... ------ -...... -- .... --
- -.. - .-.-----.- ---~-~:~ --- -. --- '--" >---.-.-.. - ------. .,
WRÆiifi~~ ; ----- ~ I
- - - - - oi- - -Ii - - Io-r - - - - ~----- ----- --- . I
iÞ..====;===== -;.>....--- --- -~-===: ~::---
--_..~ -----
---
~fi' T 0.\1: if707- ----------- --...--l----- - - - - - :t,..... -..-- ----.. ".- -- -.- - ... ..- -------
: 0 (to
: F
¡ .
i
- ..... ....-- --.-..---....¡ -,-.,--,-, .,----"-.... .. . ------.- -- -.......... . . --
I
i I !
: AN ~DR I LL i AKA DPC
;E: Jo -- - "- --
~' /\tJ~ 'f{U ~I:l D
. (FJ
i i[ I
Q -n :; Þ i
...... i'1'1 ,. 1M ... .. DE ~ ^,... .I S94-- ..
IOJ . . . ---' ¡J lTO --. ...........-
.> G') ( ~
::s t:U
n fJ) ! 1"'" ;
:r uLA i
0 C") ~
.... 0 - .. H 'h , I Ml . ..
ro ::::s -
..' ~ ü5 ~ I
C') <.0 rT'I i I
C) <:.T\ i
i 3 \!:1 , I
3 i
- ---f---Zi=-- --f--- f----- --. ... .. .-- .~ - .---
en I
õ·
:::J
i
I I 1
I I I I
6250
B550
Bß50
9000
9150
94~)O
9()OO
900
UJOO 1950 2100 2250 2400 2550
....SettïönPDe·pärtÜrë~···-· '-' - .
1350
1650
2700 ' 2850 3000
3150 3300 3450 3600
1500
1050
1200
..... ... --....
-- . -.' . . ..... ...- .. ...... . - ..... --_..,--
IMacJr 11 J (!:) 93 t e (04P6 0 I. 52 I? 00 P.II II
.
(
C
(
ì
~
~
')"".i
, :I
:2
È
Ã
....
r
r
--f
o
ì-.i
N
m
U1
m
I\J
IJ)
OJ
lJ
(S)
VI
_~ . ......... '" .J .J""9 ~ ...;J . t:; (
r- KL .-~\. ~l.Jto< 1 LL
)
~~
TO -)
2656298 P.07
PRUDHOE BAY
iOS18-18A (P06)
. PLAN VIEW
DRILLING
GROUP
CLOSUR~.....: 5252 feet at Azimuth 344.85
DECLINA~ION.: 29.497 E
SCALE..i.....: 1 inch = 500 feet
DRAWN. .i.....; 12/08/94
Marker Ident1fication
A) TlE..IN
8) END OF 6/100 CURVE
C) START 10/100 CURVE
0) -----.TARGET -----
E) END OF 10/100 CUMVE
F} TO
MD NIS
9730 2411
9970 2619
11349 3801
12018 d431
12018 4431
12809 50i'0
E/H
1056
1164
1869
1839
1839
1372
.
~nadrjll Scnlumberger
5500
I I
I I
I i
: !
0 T'--' .. - .... . I . '.0'.' - ..,..... ,L ...----
, ~
I AK "'-DPC I
I ~F ~N"DRU l
! I .i.r'i nri" ,\ I r:::.. n i
0 I
I 7 r\f r f' \", ~ V '- L...i' ¡
I
; ¡ / +-...
: I nFC n 8 .J994
.... . . . -. .. 00'" .. . ..
¡ J , O~ ...ð -=
iN~ TiP 1- i
j ~ !
0 ~. TARGr: JOO FT RADIUS
!
i ¡
I ,
}- ~-_. . .¡ . ....-. I ..... ., . -'-" ...,. ..'" .. ..-..-.,..-.------:-
; I
I ...
; \cQ
I
: \ i
" :
... . . ..- \ "" -. ...,...... .
" I :
i \ I
. , i I
, \ :
: 1
¡ \\ I
I I
! i
; I
I \ I
--... ....- ~. .. t··_~- .. . . ..... ...--
\ . . .~-
. ,
, :
\\.. I
! '\ ì
¡ ! '.
I
-. , n" ,.. ,., .... I V-E·D·
I ~ . -. ~, n, .. . . " .... ~ L: I ...._~-
;
i i
:
: I :
I ì I F :'R - q lqq~
: I I \A !
i
i , ~ laska Oil & Gas Cons. Comm i ssfon
j i \ Anchora"~
1- 0:-'" -- . .- -.. ~. -I- --, .. q"T--
! \
I \
\ ¡
; \ , i
I I I
7~O
500
250 0 250
.<- WEST: ÈAST ~>
500
525
500
4750
450
4250
4000
3750
3500
3250
^ 3000
I
:!:
-
c::
c
z 2750
2500
2250
2000
300~ 2750 2500 2250 2000 1750 1500 1250 1000
CJ.t¡iI~jJJ 6c.J~.J82WS SLS2 ~~;01 PH 3)
:~ .:.... ~: _:: ¡':'.: -~:: ;.., -; .; .. .~ .'~. .:> .; : " ,. .:. . .
i7:':.~ : ..'. i . .
" .
.' .
... ..
.."...-~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
----=-;;.~
0__
,p--.
1. Type of Request: Abandon ~ Suspend _ Operation Shutdown _ Re-enter suspended well_
Alter casing _ Repair well_ Plugging ~ Time extension _ Stimulate _
Change approved program _ Pull tubing _ Variance _ Perforate _ Other --2L- Pluç¡back for redrill
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
406' SNL, 205' EWL, SEC. 19, Tll N, R 15E
At top of productive interval
N/A
At effective depth
N/A
At total depth
1654' SNL, 1623' WEL, SEC. 13, TllN, R14E
12. Present well condition summary
Total depth: measured
true vertical
5. Type of Well:
Development ~
Exploratory _
Stratigraphic _
Service _
6. Datum elevation (OF or KB)
I<BE = 54' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
18-18
9. Permit number
88-113
10. API number
50- 029-21872
11. Field/Pool
Prudhoe Bay Field/Oil Pool \
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length
11550 feet Plugs (measured)
8709 feet
N/A feet Junk (measured)
feet
Size Cemented Measured depth True vertical depth
Effective depth:
measured
true vertical
80' 20" 2150 # Poleset
3435' 13-3/8" 2000sxCSf/II600sx"G'/200sxCS/I
8902' 9-5/8" 750 sx Class "G"
1712' 7" 500 sx Class "G"
1281' 4-1/2" Slotted liner
measured Slotted Liner Completion (10338'-11482' MD)
110'
3473'
8935'
8605'-10317'
10244 '-11525'
110'
3473'
8258'
8090'-8667'
R" E <!tIVl:6b
true vertical
FEB - 9 1995
, Alaska Oil & Gas Cons. CCfilfnission
. ; Anchom
Tubing (size, grade, and measured depth) 3-1/2", L-80 tubing w/tail @ 10019' MD
Packers and SSSV (type and measured depth) Cameo 'TRDP-1A-SSA' @ 2224' MD; TIW 'SS' Packer @ 9984' MD
13. Attachments
Description summary of proposal ...L-
Detailed operations program _
BOP sketch
-
14. Estimated date for commencing operation
2/15/95
16. If proposal was verbally approved
15. Status of well classification as:
Oil...K-
Gas
-
Suspended _
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed dI.iu6 6/f!~~..tJ-"'- r~ 7G~~f ~~";?'tit;e Drilling Engineer SupelVisor
. FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ¡/"' BOP Test _ Location clearance
Mechanical Integrity Test _ Subsequent ~orm req.\-fired 1 0- ~ {) (
~;;ïgmal SIgned fjY
David W. Johnston
Date ,,:/ /9/ c; J
Approved by order of the Commission
I Approval No·q.s-_ð.;¿s-
,
Approved Copy
Re~:ed
t"~ ~~
Date :2 II:; /'7 \-
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE '--..
.,~
1
COMPANY A~r 0.
/êLL PERMIT CHECKLIST
FIELD & POOL G <7ð ) ... <)0
,
ADMINISTRATION
)
~ :0~/¡.f
ENGINEERING
APPR
14.
15.
16.
17.
lB.
19.
20.
21.
22.
23.
24.
25.
l{/1TE ___26.
7~ 27.
2B.
29.
--
GEOLOGY
APPR
DATE
~/J
'CORMS\cheklist rev 03194
1-c!J.?,/
INIT CLASS LJeA/
1.
2.
3.
4.
5.
6.
, 7.
B.
9.
10.
11.
12.
13.
Permit fee attached. . . . .
Lease number appropriate. .
Unique well name and number.
Well located in a defined pool. . . . . . . . . . . .
Well located proper distance from drlg unit boundary. .
Well located proper distance from other wells. . .
Sufficient acreage available in drilling unit.
If deviated, is wellbore plat included . . . .
Operator only affected party. . . . . . .
Operator has appropriate bond in force. . . . . . . . .
Permit can be issued without conservation order. . . .
Permit can be issued without administrative approval. .
Can permit be approved before IS-day wait. . . . . . .
......
WELL NAME,/J~ l-ðJ /
GEOL AREA ?/O UNIT#
N
N
N
N
N
N
N
N
N
N
N
N
N
~1
IJt
D/~
I
30.
31.
32.
33.
34.
Permit can be issued w/o hydrogen sulfide measures. ./.Y N
Data presented on potential overpressure zones . . . . . Y ~ ~
Seismic analysis 9f shallow gas zones. . . . . .. N (.
Seabed condition survey (if off-shore) . . Y N
Contact name/phone for weekly progress reports . . . Y N
[exploratory only]
GEOLOGY:
ENGINEERING:
COMMISSION:
DWJ~
RAD
TAB \¡A1-
RP~
BEW~ 2./ e(
JDuß
Comments/Instructions:
REMARKS
J~
9S-0-a.Ç'
PROGRAM: exp [) dev 0 redrlÌ/ßÍ serv [)
//ç)" 0 ON/OFF SHORE OrJ
o d /lrcJ ",Q(
/ '
dlrf9~
u
0
Z
0
t-3
~
:E:
Þd
H
t-3
i:J:j
H
Z
t-3
::r:
H
en
en
t-c::J
~
0
i:J:j
Conductor string provided. . . . . . . . . . . . .Y
Surface casing protects all known USDWs . . . . . .Y
CMT vol adequate to circulate on conductor & surf csg. . Y
CMT vol adequate to tie-in long string to surf csg . . . Y
CMT will cover all known productive horizons. . . . . . (!) N
Casing designs adequate for C, T, B & permafrost. . . . (!) N
Adequate tankage or reserve pit. . . . . . . . . . . . . (f) N ,_ ?
If a re-drill, has a 10-403 for abndnmnt been approved. . Y N ],U-- ~~ 5 ,;
Adequate wellbore separation proposed. . . . . . . . . . (f) N .. 1. I .0 .1
If diverter required, is it adequate. . . . . . . . . . ~~l ~~
Drilling fluid program schematic & equip list adequate. (X) N t)
BOPEs adequate . . . .. . . . . . . . . . . . . . . . . G::> N
BOPE press rating ad~quate; test to ~ psig.<!> N
Choke manifold complies w/API RP-53 (May 84). . . . 1'¥--!io N A-
Work will occur without operation shutdown. . <X> N
Is presence of E2S gas probable . . . . . . . . . . Y Q
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
~5-DIL\
1J 1~ 19
cubfile 2 is type: LJS
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
#
WELL KAME:
API N1JMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
D.S. 18-18A PB1
500292187270
ARCO ALASKA, INC.
SPERRY-SUN DRILLING SERVICES
07-NOV-96
MWD RUN 1
AK-MW-50016
D. STEWART
C. DIXON
MWDRUN 2
MWDRUN 3
D. STEWART
G. BECK
D. STEWART
G. BECK
MWDRUN 4
D. STEWART
G. BECK
19
IlN
15E
406
F~[ ~~,.~ (~~ E; Î\¡'¡i:: tJ·.-""
. I ~..--'-"~. ~,¿ ~ ,\1 ~~~ ~~
¡'l n V 1 5 1996
Aía.:.-f\ ':' 'J ' . ," Coos· ........ .
. .;¡, 1;;1 ". ., !,.¡ -..:18:$ . .: J'-f'(t'J('í'¡-n...
-.. ~ ~,...J~r ~'!~r,.t U'~!
AnGhor~
205
MSL 0)
At/(Io:
bqte I '!lAtIß
48.22
46.82
17.30
OPEN HOLE CASING
BIT SIZE (IN) SIZE (IN)
13.375
9.625
7.000
6.000
DRILLERS
DEPTH (FT)
3466.0
8699.0
9776.0
11952.0
MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WELL 18-18A PB1 IS REPRESENTED BY RUNS 1-4.
RUNS 1-4 ARE DIRECTIONAL WITH GAMMA RAY (SGRD).
GAMMA RAY ACQUIRED WITH NATURAL GAMMA PROBE,
SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS
NGP/SGRD.
ALL GAMMA RAY DATA PRESENTED IS DOWNHOLE RECORDED.
GAMMA RAY LOGGED THROUGH 7" CASING FROM 9400' TO 9726'.
WELL 18-18A PB1 KICKED-OFF FROM WELL 18-18A THROUGH A
WINDOW CUT IN THE 7" CASING FROM 9726' TO 9776'.
WELL 18-18A PB1 HAS BEEN DEPTH SHIFTED.
WELL 18-18A PBl WAS DRILLED TO TD AT 11952' .
$
.....J~ HEADER
t-"1ILE I\TUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
9725.0
STOP DEPTH
11910.0
#
BASELINE CURVE FOR SHIFTS: UNKNOWN
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
9724.5
9736.0
9751.0
9792.5
9793.0
9807.0
9854.0
9859.5
9875.0
9915.5
10012.5
10294.0
10298.5
10554.0
10563.0
10569.0
10619.0
10620.0
10631.5
10789.0
10801.0
10977.0
11017.0
11024.5
11048.0
11051.0
11052.5
11055.0
11063.5
11072.0
11144.5
11162.0
11169.5
11174.0
11180.0
11202.5
11203.0
11221.5
11244.0
11246.5
11255.5
11278.5
11282.5
11953.5
GR
9727.0
9738.5
9754.0
9794.5
9795.0
9808.5
9856.0
9861.5
9877.0
9916.5
10013.0
10294.0
10299.0
10556.0
10564.5
10570.5
10619.5
10621.0
10631.5
10789.0
10800.5
10978.0
11017.0
11024.5
11047.5
11050.5
11052.0
11054.5
11063.0
11071.5
11144.0
11161.5
11168.5
11172.5
11179.0
11201.5
11202.0
11220.0
11242.5
11245.0
11254.0
11277.0
11280.5
11951.5
62 bytes
1014 bytes
192 records...
13684 datums
Minimum record length:
Maximum record length:
Tape Subfile: 2
LIS representation code decoding summary:
Rep Code: 68
11980.000000
9700.000000
0.500000
Feet
**** FILE TRAILER ****
Tape File Start Depth
Tape File End Depth =
Tape File Level Spacing
Tape File Depth Units
Total Data Records: 55
(TYPE# 0) 1014 BYTES *
8
-------
1
1
4 90 310 01
4 90 810 01
4
4
AAPI
FPHR
1
1
68
68
* DATA RECORD
GR MWD
ROP MWD
1
2
API API API API
Log Crv Crv
Size Length Typ Typ CIs Mod
Name Tool Code Samples Units
MERGE BASE
10561.0
11350.0
11572.0
11952.0
(TYPE# 64)
ARCO ALASKA, INC.
D.S. 18-18A PB1
PRUDHOE BAY
NORTH SLOPE
ALASKA
MERGE TOP
9776.0
10561.0
11350.0
11572.0
2 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
* FORMAT RECORD
CN
WN
FN
COUN
STAT
#
j??SHIFT.OUT
$
MERGED MAIN PASS.
#
REMARKS:
BIT RUN NO
1
2
3
4
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MVJD
Mì\iD
MWD
$
o
. 0
.00
.000
.000 .0
.000 133.2
.000 .0
.000 .0
KCL-POLYMER
9.00
55.0
9.2
38000
6.0
6.000
9776.0
TOOL NUMBER
NGP 185
73.2
88.7
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
10561.0
9776.0
10561.0
o
07-MAR-95
MWD RUN 1.
REMARKS:
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
NEUTRON TOOL
IVIATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10512.0
START DEPTH
9727.0
FILE HEADER
FILE KUMBER:
RAW MVJD
Curves and
BIT RL'N NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
log header data for each bit run in separate files.
1
.5000
2
,~ Subfile 3 is type: LIS
62 bytes
1014 bytes
Minimum record length:
Maximum record length:
84 records...
Tape Subfile: 3
5224 datums
Rep Code: 68
LIS representation code decoding summary:
**** FILE TRAILER ****
Feet
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
= 10570.000000
9700.000000
0.500000
Total Data Records: 21
(TYPE# 0) 1014 BYTES *
* DATA RECORD
8
-------
1
1
4 90 310 01
4 90 810 01
4
4
AAPI
FPHR
1
1
68
68
GR MWD
ROP MWD
1
2
API API API API
Log Crv Crv
Size Length Typ Typ CIs Mod
Name Tool Code Samples Units
2 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
(TYPE# 64)
* FORlv1AT RECORD
ARCO ALASKA, INC.
D.S. 18-18A PB1
PRUDHOE BAY
NORTH SLOPE
ALASKA
CN
WN
FN
COUN
STAT
$
¿è Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
3
log header data for each bit run in separate files.
2
.5000
START DEPTH
10503.0
STOP DEPTH
11306.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
MWD RUN 2.
08-MAR-95
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
11350.0
10561.0
11350.0
o
85.0
86.6
TOOL NUMBER
NGP 185
6.000
9776.0
KCL-POLYMER
9.10
57.0
9.0
40000
6.0
.000 .0
.000 137.5
.000 .0
.000 .0
.00
.000
. 0
o
62 bytes
1014 bytes
Minimum record length:
Maximum record length:
84 records...
Tape Subfile: 4
18848 datums
Rep Code: 68
LIS representation code decoding summary:
**** FILE TRAILER ****
Feet
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units
11360.000000
10500.000000
0.500000
21
Total Data Records:
(TYPE# 0) 1014 BYTES *
* DATA RECORD
8
-------
1
1
4 90 310 01
4 90 810 01
4
4
AAPI
FPHR
1
1
68
68
GR MWD
ROP MWD
1
2
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
Name Tool Code Samples Units
2 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
(TYPE# 64)
* FORMAT RECORD
ARCO ALASKA, INC.
D.S. 18-18A PB1
PRUDHOE BAY
NORTH SLOPE
ALASKA
CN
WN
FN
COUN
STAT
$
¿è Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
4
log header data for each bit run in separate files.
3
.5000
START DEPTH
11307.0
STOP DEPTH
11528.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
MWD RUN 3.
09-MAR-95
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
11572.0
11350.0
11572.0
o
85.8
91.0
TOOL NUMBER
NGP 185
6.000
9776.0
KCL-POLYMER
9.10
54.0
9.0
42000
5.5
.000 .0
.000 129.0
.000 .0
.000 .0
.00
.000
. 0
o
$
CN
WN
FN
COUN
STAT
ARCO ALASKA, INC.
D.S. 18-18A PB1
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD
(TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ CIs Mod
1
2
GR MWD
ROP MWD
68
68
1
1
AAPI
FPHR
4
4
4 90 310 01
4 90 810 01
1
1
-------
8
* DATA RECORD
(TYPE# 0) 1014 BYTES *
Total Data Records:
7
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units
11580.000000
11300.000000
0.500000
Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
6908 datums
Tape Subfile: 5
70 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
~ç Subfile 6 is type: LÎS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
5
log header data for each bit run in separate files.
4
.5000
START DEPTH
11529.0
STOP DEPTH
11908.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
MWD RUN 4.
10-MAR-95
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
11952.0
11572.0
11952.0
o
81.5
90.7
TOOL NUMBER
NGP 185
6.000
9776.0
KCL-POLYMER
9.10
57.0
9.2
42000
5.4
.000 .0
.000 133.2
.000 .0
.000 .0
.00
.000
. 0
o
$
CN
WN
FN
COUN
STAT
ARCO ALASKA, INC.
D.S. 18-18A PB1
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD
(TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ CIs Mod
1
2
GR MWD
ROP MWD
68
68
1
1
AAPI
FPHR
4
4
4 90 310 01
4 90 810 01
1
1
-------
8
* DATA RECORD
(TYPE# 0) 1014 BYTES *
Total Data Records:
11
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
11980.000000
11520.000000
0.500000
Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
21612 datums
Tape Subfile: 6
74 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
~e Subfile 7 is type: LtS
96/10/29
01
**** REEL TRAILER ****
96/11/ 6
01
Tape Subfile: 7
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
End of execution: Wed 6 NOV 96 10:09a
Elapsed execution time = 1.10 seconds.
SYSTEM RETURN CODE = 0
.,t-Ie Subfile 2 is t;ype: ,LIS
c¡e:; -0(4
~ 75) g
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
D.S. 18-18A
500292187201
ARCO ALASKA, INC.
SPERRY-SUN DRILLING SERVICES
07-NOV-96
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-50016
D. STEWART
C. DIXON
MWD RUN 2
MWD RUN 5
D. STEWART
G. BECK
D. STEWART
C. DIXON
MWDRUN 7
MWD RUN 8
JOB NUMBER:
LOGGING ENGINEER: D. STEWART
OPERATOR WITNESS: C. DIXON
D. STEWART
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
19
IlN
15E
406
MICROFILMED
Date-Lj.y o} _
R.ECE'\lED
205
NOV 1 5 1996
" "
Alaska au & Gas C.ons. ~Omm!S&10n
Anchor~e
48.22
46.82
17.30
#
WELL CASING RECORD
1ST STRING
2ND STRING·
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING
BIT SIZE (IN) SIZE (IN)
13.375
9.625
7.000
6.000
DRILLERS
DEPTH (FT)
3466.0
8699.0
9776.0
13062.0
#
REMARKS:
MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WELL 18-18A IS REPRESENTED BY RUNS I, 2, 5, 6, 7, AND 8.
TOOL FAILED DURING RUN 6 AND NO LOGGING WAS DONE.
RUNS I, 2, 5, 7, AND 8 ARE DIRECTIONAL WITH GAMMA RAY
(SGRD) .
GAMMA RAY ACQUIRED WITH NATURAL GAMMA PROBE,
SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS
NGP/SGRD.
ALL GAMMA RAY DATA PRESENTED IS DOWNHOLE RECORDED.
WELL 18-18A SIDETRACKED FROM WELL 18-18A PBl AT 11300'.
WELL 18-18A HAS BEEN DEPTH SHIFTED.
WELL 18-18A WAS DRILLED TO TD AT 13062'.
$
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
$
1
and clipped curves¡ all bit runs merged.
.5000
START DEPTH
9725.0
STOP DEPTH
13008.0
#
BASELINE CURVE FOR SHIFTS: GR (WALS, Open Hole, 14-Mar-95.)
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
9736.0
9751.0
9792.5
9793.0
9807.0
9854.0
9859.5
9875.0
9915.5
10012.5
10294.0
10298.5
10554.0
10563.0
10569.0
10619.0
10620.0
10631.5
10789.0
10801.0
10977.0
11017.0
11024.5
11048.0
11051.0
11052.5
11055.0
11063.5
11072.0
11144.5
11162.0
11169.5
11174.0
11180.0
11202.5
11203.0
11221.5
11244.0
11246.5
11255.5
11278.5
11282.5
11429.5
11435.5
GR
9738.5
9754.0
9794.5
9795.0
9808.5
9856.0
9861.5
9877.0
9916.5
10013.0
10294.0
10299.0
10556.0
10564.5
10570.5
10619.5
10621.0
10631.5
10789.0
10800.5
10978.0
11017.0
11024.5
11047.5
11050.5
11052.0
11054.5
11063.0
11071.5
11144.0
11161.5
11168.5
11172.5
11179.0
11201.5
11202.0
11220.0
11242.5
11245.0
11254.0
11277.0
11280.5
11427.0
11433.5
13100.000000
9700.000000
0.500000
Feet
**** FILE TRAILER ****
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
81
Total Data Records:
(TYPE# 0) 1014 BYTES *
8
-------
1
1
4 90 310 01
4 90 810 01
4
4
AAPI
FPHR
API API API API
Log Crv Crv
Size Length Typ Typ CIs Mod
MERGE BASE
10561.0
11300.0
12011.0
12847.0
13062.0
1
1
68
68
* DATA RECORD
GR MWD
ROP MWD
1
2
Name Tool Code Samples Units
2 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
* FORMAT RECORD (TYPE# 64)
ARCO ALASKA, INC.
D.S. 18-18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
MERGE TOP
9776.0
10561.0
11300.0
12011.0
12847.0
CN
WN
FN
COUN
STAT
#
/??SHIFT.OUT
$
MERGED MAIN PASS.
BIT RUN NO
1
2
5
7
8
11497.0
11611.0
11611.5
11693.5
11728.5
11777.5
11834.5
11924.5
11945.0
#
REMARKS:
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
fvlWD
MWD
MWD
$
.11498.5
11612.5
11613.0
11695.5
11728.5
11777.0
11836.5
11923.0
11944.0
$
LIS representation code decoding summary:
Rep Code: 68
20404 datums
Tape Subfile: 2
Minimum record length:
Maximum record length:
228 records...
62 bytes
1014 bytes
o
. 0
.00
.000
.000 .0
.000 133.2
.000 .0
.000 .0
KCL-POLYMER
9.00
55.0
9.2
38000
6.0
6.000
9776.0
TOOL NUMBER
NGP 185
73.2
88.7
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
10561.0
9776.0
10561.0
o
07-MAR-95
MWD RUN 1.
REMARKS:
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10512.0
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
START DEPTH
9727.0
log header data for each bit run in separate files.
1
.5000
2
Tape Subfile 3 is type: LIS
62 bytes
1014 bytes
Minimum record length:
Maximum record length:
84 records...
Tape Subfile: 3
5224 datums
Rep Code: 68
LIS representation code decoding summary:
**** FILE TRAILER ****
Feet
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
10570.000000
9700.000000
0.500000
21
Total Data Records:
(TYPE# 0) 1014 BYTES *
* DATA RECORD
API API API API
Log Crv Crv
Name Tool Code Samples Units Size Length Typ Typ CIs Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 ROP MWD 68 1 FPHR 4 4 90 810 01 1
-------
8
2 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
* FORMAT RECORD (TYPE# 64)
ARCO ALASKA, INC.
D.S. 18-18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
CN
WN
FN
COUN
STAT
#
$
o
. 0
.00
.000
.000 .0
.000 137.5
.000 .0
.000 .0
KCL-POLYMER
9.10
57.0
9.0
40000
6.0
6.000
9776.0
TOOL NUMBER
NGP 185
85.0
86.6
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
11300.0
10561.0
11300.0
o
08-MAR-95
MWD RUN 2.
REMARKS:
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11300.0
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
START DEPTH
10503.0
log header data for each bit run in separate files.
2
.5000
3
Tape Subfile 4 is type: LIS
$
#
CN
WN
FN
COUN
STAT
ARCO ALASKA, INC.
D.S. 18-18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD
(TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samplés Units
API API API API
Log Crv Crv
Size Length Typ Typ CIs Mod
1
2
GR MWD
ROP MWD
68
68
1
1
AAPI
FPHR
4
4
4 90 310 01
4 90 810 01
1
1
-------
8
* DATA RECORD
(TYPE# 0) 1014 BYTES *
Total Data Records:
20
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
11305.000000
10500.000000
0.500000
Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
25238 datums
Tape Subfile: 4
83 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
o
.0
.00
.000
.000 .0
.000 137.5
.000 .0
.000 .0
KCL-POLYMER
9.00
55.0
9.5
40000
6.0
6.000
9776.0
TOOL NUMBER
NGP 185
85.9
91.6
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
12011.0
11300.0
12011.0
o
14-MAR-95
MWD RUN 5.
REMARKS:
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (8):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11968.0
START DEPTH
11279.0
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
log header data for each bit run in separate files.
5
.5000
4
Tape Subfile 5 is type: LIS
$
#
CN
vlN
FN
COUN
STAT
ARCO ALASKA, INC.
D.S. 18-18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1
2
GR MWD
ROP MWD
68
68
1
1
AAPI
FPHR
4
4
4 90 310 01
4 90 810 01
1
1
-------
8
* DATA RECORD
(TYPE# 0) 1014 BYTES *
Total Data Records:
18
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
12020.000000
11270.000000
0.500000
Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
9728 datums
Tape Subfile: 5
81 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
5
log header data for each bit run in separate files.
7
.5000
START DEPTH
11959.0
STOP DEPTH
12793.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (8):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
MWD RUN 7.
17-MAR-95
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
12847.0
12011.0
12847.0
o
89.2
92.3
TOOL NUMBER
NGP 185
6.000
9776.0
KCL-POLYMER
9.10
55.0
9.4
45000
5.2
.000 .0
.000 158.6
.000 .0
.000 .0
.00
.000
.0
o
$
#
CN ARCO ALASKA, INC.
WN D.S. 18-18A
FN PRUDHOE BAY
COUN NORTH SLOPE
STAT ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ CIs Mod
1
2
GR MWD
ROP MWD
68
68
1
1
AAPI
FPHR
4
4
4 90 310 01
4 90 810 01
1
1
-------
8
* DATA RECORD
(TYPE# 0) 1014 BYTES *
Total Data Records:
22
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
12855.000000
11950.000000
0.500000
= Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
30672 datums
Tape Subfile: 6
85 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
6
log header data for each bit run in separate files.
8
.5000
START DEPTH
12794.0
STOP DEPTH
13008.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LBjG):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
MWD RUN 8.
18-MAR-95
MSC 1.32 / PCDWD 1.16X
DEP 2.041 / NGP 5.74
MEMORY
13062.0
12847.0
13062.0
o
89.2
90.6
TOOL NUMBER
NGP 185
6.000
9776.0
KCL-POLYMER
9.20
62.0
9.2
43000
5.2
.000 .0
.000 158.6
.000 .0
.000 .0
.00
.000
. 0
o
$
#
CN
WN
FN
COUN
STAT
ARCO ALASKA, INC.
D.S. 18-18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD
(TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ CIs Mod
1
2
GR MWD
ROP MWD
68
68
1
1
AAPI
FPHR
4
4
4 90 310 01
4 90 810 01
1
1
-------
8
* DATA RECORD
(TYPE# 0) 1014 BYTES *
Total Data Records: 8
Tape File Start Depth =
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
13100.000000
12785.000000
0.500000
Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
11622 datums
Tape Subfile: 7
71 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 8 is type: LIS
96/10/29
01
**** REEL TRAILER ****
96/11/ 6
01
Tape Subfile: 8
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
End of execution: Wed 6 NOV 96 10:11a
Elapsed execution time
1.37 seconds.
SYSTEM RETURN CODE = 0
// D\
q'J /J
GlyL
c rl(íDR
RECEltl
ED
JUt @ 7
Alaska Oil & ~ 199$
Gas Calis C
Anchoran· °flJrn¡coco·
l:ie UQ10n
******************************
* *
* ALASKA COMPUTING CENTER *
* *
******************************
*----------------------------*
*------- SCHLUMBERGER -------*
*----------------------------*
******************************
COMPANY NAME
WELL NAME
FIELD NAME
BOROUGH
STATE
API NUMBER
REFERENCE NO
ARCO ALASKA, INC.
D.S. 18-18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
50-029-21872-01
95247
Q
~
:;;~
~
~
~ .$
--.=. ~
~
LIS Tape Verification listing
Schlumberger Alaska Computing Center
21-JUL-1995 20:02
PAGE:
1
****
SERVICE
DATE
ORIGIN
REEL NAME
CONTINUATION #
PREVIOUS REEL
COMMENT
REEL HEADER ****
NAME EDIT
95/07/21
FLIC
95247
ARCO ALASKA INC, D.S. 18-18A, PRUDHOE BAY, 50-029-21872-01
**** TAPE
SERVICE NAME
DATE
ORIGIN
TAPE NAME
CONTINUATION #
PREVIOUS TAPE
COMMENT
HEADER ****
EDIT
95/07/21
FLIC
95247
1
ARCO ALASKA INC, D.S. 18-18A, PRUDHOE BAY, 50-029-21872-01
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINE LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
D.S. 18-18A
500292187201
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
21-JUL-95
95247
SIMMONS
B.MOXLOW
19
11N
15E
406
2Ø5
48.2Ø
46.8Ø
17.3Ø
#
WELL CASING RECORD
OPEN HOLE
BIT SIZE (IN)
CASING DRILLERS CASING
SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
--------- ---------- --------------
9.625 8934.Ø 47.00
7.0ØØ 9726.0 29.0Ø
4.5ØØ 13058.0 12.60
-------------
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH)
**** FILE HEADER ****
FILE NAME : EDIT .ØØ1
SERVICE : FLIC
VERSION : ØØ1CØ1
DATE : 95/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
The depth adjustments shown above reflect cased hole GR
(PASS #1, BACKGROUND PASS) to open hole GR and cased
hole SIGM (PASS #1, BACKGROUND PASS) to open hole GR.
AI I other TDTP curves were carried with the SIGM shifts.
THE RAW PASSES AND EDITED BACKGROUND PASS WAS REMOVED
FROM THIS TAPE BECAUSE THIS DATA SET WOULD NOT FIT ON
TO A 3 1/2" DISKETTE. BOTH ARCO AND BP HAVE ALL OF THE
DATA.
$
REMARKS:
----------EQUIVALENT UNSHIFTED DEPTH----------
BASELINE DEPTH GRCH TDTP
-------------- ------- -------
88888.0 88869.5 88869.5
11939.5 11921. Ø
11923.5 11905.0
11854.Ø 11836.5
11795.5 11777.0
11748.0 11731.Ø
11747.5 11730.5
11630.5 11611.0
1163Ø.0 11611.0
116Ø6.5 11587.5
11574.Ø 11559.0
11518.Ø 11499.5
11453.0 11433.5 11433.5
114Ø1.0 11381.Ø 11381.0
11346.5 11325.0 11325.0
11267.0 11247.0
11264.Ø 11245.0
11216.Ø 11196.Ø 11196.0
11071. Ø 11Ø51.Ø 11051.0
10999.5 10978.5
10998.Ø 1Ø978.5
1ØØ.Ø 79.0 8Ø.5
$
#
#
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: BCS
LDWG CURVE CODE: GR
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
2
PAGE:
21-JUL-1995 2Ø:Ø2
LIS Tape Verificãtion tisting
Schlumberger Alaska Computing Center
This fi Ie contains TDTP Pass #2. The depth shifts
REMARKS:
41=
$
11582.5
88888.Ø
11628.5
116Ø2.5
11598.5
11574.Ø
11554.Ø
11546.Ø
11512.5
115Ø3.5
11464.Ø
11462.Ø
114Ø6.5
11395.Ø
113Ø3.Ø
11295.Ø
11264.Ø
11213.5
11211.Ø
11187.Ø
11167.5
11Ø71.5
11ØØ6.5
1Ø999.5
1Ø938.Ø
1Ø935.5
1Ø898.5
1Ø811.Ø
1Ø76Ø.5
1Ø755.Ø
1ØØ.Ø
1Ø734.Ø
79.Ø 8Ø.5
1Ø741.Ø
1Ø876.Ø
1Ø79Ø.5
1Ø916.Ø
1Ø978.5
1Ø917.5
1Ø987.5
11194.Ø
11245.5
11192.Ø
11167.Ø
11147.Ø
11Ø51. 5
11274.5
11443.Ø
11386.5
11376.Ø
11283.Ø
11488.5
11445.5
11494.5
11527.5
11536.Ø
11581.Ø
11559.Ø
88868.Ø 88869.5
1161Ø.Ø
------- -------
--------------
----------EQUIVALENT UNSHIFTED DEPTH----------
GRCH TDTP
BASELINE DEPTH
41=
41=
CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
1Ø689.Ø
1Ø689.Ø
116Ø8.Ø
11643.Ø
GRCH
TDTP
$
----------
-----------
--------------
STOP DEPTH
START DEPTH
FILE HEADER
FILE NUMBER:
EDITED CURVES
Depth shifted
PASS NUMBER:
DEPTH INCREMENT:
41=
FILE SUMMARY
LDWG TOOL CODE
and clipped curves for each pass in separate fi les.
2
ø.Søøø
1
3
PAGE:
21-JUL-1995 2Ø:Ø2
LIS Tape Verifioation listing
Schlumberger Alaska Computing Center
LIS Tape Verifiéation Listing
Schlumberger Alaska Computing Center
21-JUL-1995 2Ø:Ø2
PAGE:
4
shown above relect GRCH pass #2 to GRCH BACKGROUND
pass #1 and SIGM pass #2 to SIGM BACKGROUND pass #1.
BCS GR IS IN BACKGROUND PASS FILE.
$
#
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
------------------------------
TYPE REPR CODE VALUE
------------------------------
1 66 ø
2 66 ø
3 73 88
4 66 1
5 66
6 73
7 65
8 68 Ø.5
9 65 FT
11 66 11
12 68
13 66 ø
14 65 FT
15 66 68
16 66 1
ø 66 ø
------------------------------
** SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
SIGM TDTP CU 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
TPHI TDTP PU-S 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
SBHF TDTP CU 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
SBHN TDTP CU 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
SIGC TDTP CU 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
SIBH TDTP CU 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
TRAT TDTP 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
SDSI TDTP CU 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
BACK TDTP CPS 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
FBAC TDTP CPS 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
TCAN TDTP CPS 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
TCAF TDTP CPS 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
TCND TDTP CPS 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
TCFD TDTP CPS 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
TSCN TDTP CPS 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøøø
HEADER ****
EDIT .0Ø2
FLIC
ØØ1CØ1
95/Ø7/21
1Ø24
LO
**"'''' FILE
FILE NAME
SERVICE
VERSION
DATE
MAX REC SIZE
FILE TYPE
LAST FILE
"'''''''''' FILE TRAILER *"'''''''
FILE NAME : EDIT .ØØ1
SERVICE : FLIC
VERSION : ØØ1CØ1
DATE : 95/Ø7/21
MAX REC SIZE : 1Ø24
FILE TYPE : LO
LAST FILE
"'''' DATA "''''
DEPT. 11624.5Ø0 SIGM.TDTP 14.966 TPHI.TDTP 31.606 SBHF.TDTP 31. 654
SBHN.TDTP 41. Ø51 SIGC.TDTP Ø.157 SIBH.TDTP 49.564 TRAT.TDTP 2.1Ø3
SDSI.TDTP Ø.294 BACK.TDTP 82.839 FBAC.TDTP 32.097 TCAN.TDTP 48777.445
TCAF.TDTP 17857.527 TCND.TDTP 24178.664 TCFD.TDTP 7519.2Ø5 TSCN.TDTP 8738.168
TSCF.TDTP 3199.Ø62 INND.TDTP 1318.51Ø INFD.TDTP 281.441 GRCH.TDTP -999.25Ø
TENS.TDTP 425.ØØØ CCL.TDTP ø.øøø
DEPT. 1Ø668.ØØØ SIGM.TDTP -999.25Ø TPHI.TDTP -999.25Ø SBHF.TDTP -999.25Ø
SBHN.TDTP -999.25Ø SIGC.TDTP -999.25Ø SIBH.TDTP -999.25Ø TRAT.TDTP -999.25Ø
SDSI. TDTP -999.25Ø BACK.TDTP -999.25Ø FBAC.TDTP -999.25Ø TCAN.TDTP -999.25Ø
TCAF.TDTP -999.25Ø TCND.TDTP -999.25Ø TCFD.TDTP -999.25Ø TSCN.TDTP -999.25Ø
TSCF.TDTP -999.25Ø INND.TDTP -999.25Ø INFD.TDTP -999.25Ø GRCH.TDTP 23.672
TENS.TDTP -999.25Ø CCL.TDTP -999.25Ø
"'''' END OF DATA "'*
---------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
TSCF TDTP CPS 5Ø6247 ØØ øøø øø ø 1 1 1 4 68 øøØØøøøøØø
INND TDTP CPS 5Ø6247 ØØ øøø øø ø 1 1 1 4 68 øØøøøøØØØø
INFD TDTP CPS 5Ø6247 øØ øØø øø ø 1 1 1 4 68 øøøøøøøøøø
GRCH TDTP GAPI 5Ø6247 øØ øØø øø ø 1 1 1 4 68 øØøøøøøøøø
TENS TDTP LB 5Ø6247 øØ øøø øø ø 1 1 1 4 68 øøøøøøøøØø
CCL TDTP V 5Ø6247 øø øøø øø ø 1 1 1 4 68 øøøøøøøøØø
5
PAGE:
21-JUL-1995 2Ø:Ø2
LIS Tape Verification ~isting
Schlumberger Alaska Computing Center
This fi Ie contains TDTP Pass #3. The depth shifts
REMARKS:
#
$
10741. 5
79.5 81.0
11433.5
88888.0
11629.0
11600.5
11520.0
11517.0
11485.5
11452.5
11439.5
11381.5
11333.5
11295.0
11264.0
11214.0
11193.0
11158.0
11151.5
11120.0
11071.0
11070.5
11048.0
11027.0
1Ø999.0
1Ø935.0
1Ø912.5
1Ø883.0
1Ø831. 5
1Ø819.5
1Ø766.5
1Ø760.5
1Ø0.0
1Ø799.0
1Ø746.0
10812.0
1Ø891.5
1Ø86Ø.5
1Ø915.5
1Ø978.5
11138.5
11131.Ø
11Ø99.5
1105Ø.5
11029.5
11007.5
11Ø51. 0
11173.Ø
11194.Ø
11245.0
11274.5
11314.0
11420.Ø
1136Ø.5
11467.Ø
11499.Ø
8887Ø.0 88869.Ø
11610.Ø
11583.Ø
11503.5
------- -------
--------------
----------EQUIVALENT UNSHIFTED DEPTH----------
GRCH TDTP
BASELINE DEPTH
#
#
CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
1Ø695.0
10695.0
11616.0
11653.0
GRCH
TDTP
$
----------
-----------
--------------
STOP DEPTH
START DEPTH
FILE HEADER
FILE NUMBER:
EDITED CURVES
Depth shifted
PASS NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
LDWG TOOL CODE
and clipped curves for each pass in separate fi les.
3
0.5000
2
6
PAGE:
21-JUL-1995 20:02
LIS Tape Verifi~ation ~isting
Schlumberger Alaska Computing Center
LIS Tape Verification listing
Schlumberger Alaska Computing Center
21-JUL-1995 2Ø:Ø2
PAGE:
7
shown above relect GRCH pass #3 to GRCH pass #1 and
SIGM pass #3 to SIGM pass #1.
$
#
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
------------------------------
TYPE REPR CODE VALUE
------------------------------
1 66 ø
2 66 ø
3 73 88
4 66 1
5 66
6 73
7 65
8 68 Ø.5
9 65 FT
11 66 11
12 68
13 66 ø
14 65 FT
15 66 68
16 66 1
ø 66 1
------------------------------
** SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
SIGM TDTP CU 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
TPHI TDTP PU-S 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
SBHF TDTP CU 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
SBHN TDTP CU 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
SIGC TDTP CU 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
SIBH TDTP CU 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
TRAT TDTP 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
SDSI TDTP CU 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
BACK TDTP CPS 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
FBAC TDTP CPS 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
TCAN TDTP CPS 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
TCAF TDTP CPS 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
TCND TDTP CPS 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
TCFD TDTP CPS 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
TSCN TDTP CPS 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
TSCF TDTP CPS 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
HEADER ****
EDIT .ØØ3
FLIC
ØØ1CØ1
95/Ø7/21
1Ø24
LO
**** FILE
FILE NAME
SERVICE
VERSION
DATE
MAX REC SIZE
FILE TYPE
LAST FILE
**** FILE TRAILER ****
FILE NAME : EDIT .ØØ2
SERVICE : FLIC
VERSION : ØØ1CØ1
DATE : 95/Ø7/21
MAX REC SIZE : 1Ø24
FILE TYPE : LO
LAST FILE
** DATA **
DEPT. 11634.ØØØ SIGM.TDTP 12.8Ø9 TPHI.TDTP 25.947 SBHF.TDTP 38.62Ø
SBHN.TDTP 42.43Ø SIGC.TDTP Ø.8Ø5 SIBH.TDTP 52.384 TRAT.TDTP 1.978
SDSI. TDTP Ø.368 BACK.TDTP 2Ø9.589 FBAC.TDTP 44.275 TCAN.TDTP 389Ø5.ØØØ
TCAF.TDTP 1545Ø.1Ø4 TCND.TDTP 23237.781 TCFD.TDTP 7433.Ø66 TSCN.TDTP 8681.Ø31
TSCF.TDTP 3447.444 INND.TDTP 1389.6Ø6 INFD.TDTP 255.856 GRCH.TDTP -999.25Ø
TENS.TDTP 42Ø.ØØØ CCL.TDTP Ø.Øøø
DEPT. 1Ø674.5ØØ SIGM.TDTP -999.25Ø TPHI.TDTP -999.25Ø SBHF.TDTP -999.25Ø
SBHN.TDTP -999.25Ø SIGC.TDTP -999.25Ø SIBH.TDTP -999.25Ø TRAT.TDTP -999.25Ø
SDSI.TDTP -999.25Ø BACK.TDTP -999.25Ø FBAC.TDTP -999.25Ø TCAN.TDTP -999.25Ø
TCAF.TDTP -999.25Ø TCND.TDTP -999.25Ø TCFD.TDTP -999.25Ø TSCN.TDTP -999.25Ø
TSCF.TDTP -999.25Ø INND.TDTP -999.25Ø INFD.TDTP -999.25Ø GRCH.TDTP 24.Ø94
TENS.TDTP -999.25Ø CCL.TDTP -999.25Ø
** END OF DATA **
---------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
INND TDTP CPS 5Ø6247 øØ ØØØ øØ ø 2 1 1 4 68 ØøøØøøøØøø
INFD TDTP CPS 5Ø6247 ØØ ØØØ ØØ Ø 2 1 1 4 68 øØøøøøøøøø
GRCH TDTP GAPI 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøØøøøøøøø
TENS TDTP LB 5Ø6247 øø øøø øø ø 2 1 1 4 68 øøøøøøøøøø
CCL TDTP V 5Ø6247 øø øøø øØ ø 2 1 1 4 68 øøøØøøøøøø
8
PAGE:
21-JUL-1995 2Ø:Ø2
LIS Tape Verification listing
Schlumberger Alaska Computing Center
:11=
CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
:11=
----------EQUIVALENT UNSHIFTED DEPTH----------
BASELINE DEPTH GRCH TDTP
-------------- ------- -------
88888.Ø 88871. 5 88872.5
129Ø8.5 12893.Ø
12837.5 1282Ø.5
12828.Ø 12811. 5
12811.5 12794.Ø
12712.Ø 12695.Ø
12656.Ø 12639.Ø
12644.5 12626.5
125Ø4.5 12488.Ø
12459.Ø 12441.5
12458.5 12441. 5
12347.5 12329.5
12328.Ø 12311.Ø
123Ø1.5 12284.Ø
12264.5 12247.Ø
12224.5 122Ø7.Ø
12167.Ø 1215Ø.Ø
12124.5 121Ø7.Ø
11998.5 11981. 5
11981.Ø 11964.5
11963.5 11946.Ø
11939.Ø 11921.Ø
11925.Ø 119Ø7.5
11856.5 1184Ø.Ø
11844.5 11827.Ø
11794.5 11777.Ø
11749.5 11733.5 11732.5
11715.5 11699.5
11649.5 11631.5
11629.Ø 1161Ø.5
11627.5 1161Ø.5
11522.5 115Ø6.Ø
11513.Ø 11494.5
1Ø697.0
1Ø697.0
12924.Ø
12958.Ø
GRCH
TDTP
$
----------
-----------
--------------
STOP DEPTH
START DEPTH
FILE HEADER
FILE NUMBER:
EDITED CURVES
Depth shifted
PASS NUMBER:
DEPTH INCREMENT:
:11=
FILE SUMMARY
LDWG TOOL CODE
and clipped curves for each pass in separate fi les.
4
Ø.5ØØØ
3
9
PAGE:
21-JUL-1995 2Ø:Ø2
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
------------------------------
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
------------------------------
TYPE REPR CODE VALUE
------------------------------
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
#
LIS FORMAT DATA
11380.5 11360.5
11294.0 11274.5
11288.5 11269.0
11263.5 11245.0
11213.0 11194.0
11157.0 11138.0
11070.0 11051.0
11030.5 11012.5
10998.5 10978.5
10997.0 10978.0
10934.5 10916.0
10909.0 10889.0
10759.0 10740.5
10754.5 10733.5
100.0 79.0 81.5
$
#
REMARKS: This fi Ie contains TDTP Pass #4. The depth shifts
shown above relect GRCH pass #4 to GRCH pass #1 and
SIGM pass #4 to SIGM pass #1.
$
10
PAGE:
21-JUL-1995 20:02
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
LIS Tape Verification Listing 21-JUL-1995 2Ø:Ø2 PAGE: 11
Schlumberger Alaska Computing Center
** SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
SIGM TDTP CU 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
TPHI TDTP PU-S 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøØØØØØØ0
SBHF TDTP CU 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøØØØØØØ0
SBHN TDTP CU 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøØØØØØØ0
SIGC TDTP CU 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøØØØØØØ0
SIBH TDTP CU 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøØØØØØØ0
TRAT TDTP 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
SDSI TDTP CU 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
BACK TDTP CPS 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
FBAC TDTP CPS 506247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
TCAN TDTP CPS 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
TCAF TDTP CPS 5Ø6247 øø øøø Ø0 ø 3 1 1 4 68 øøøøøøøøøø
TCND TDTP CPS 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
TCFD TDTP CPS 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
TSCN TDTP CPS 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
TSCF TDTP CPS 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
INND TDTP CPS 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
INFD TDTP CPS 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
GRCH TDTP GAPI 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
TENS TDTP LB 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
CCl TDTP V 5Ø6247 øø øøø øø ø 3 1 1 4 68 øøøøøøøøøø
---------------------------------------------------------------------------------------
** DATA **
DEPT. 12942.5ØØ SIGM.TDTP 17.22Ø TPHI.TDTP 29.674 SBHF.TDTP 34.151
SBHN.TDTP 47.326 SIGC.TDTP Ø.488 SIBH.TDTP 67.8Ø1 TRAT.TDTP 1.934
SDSI.TDTP Ø.42Ø BACK.TDTP 262.776 FBAC.TDTP 67.Ø89 TCAN.TDTP 2711Ø.586
TCAF.TDTP 10412.482 TCND.TDTP 20357.156 TCFD.TDTP 6247.602 TSCN.TDTP 6123.316
TSCF.TDTP 2351.810 INND.TDTP 1304.741 INFD.TDTP 244.174 GRCH.TDTP -999.250
TENS.TDTP 405.000 CCl.TDTP 0.000
DEPT. 10676.000 SIGM.TDTP -999.250 TPHI.TDTP -999.250 SBHF.TDTP -999.250
SBHN.TDTP -999.250 SIGC.TDTP -999.250 SIBH.TDTP -999.250 TRAT.TDTP -999.250
SDSI.TDTP -999.25Ø BACK.TDTP -999.250 FBAC.TDTP -999.250 TCAN.TDTP -999.25Ø
TCAF.TDTP -999.25Ø TCND.TDTP -999.25Ø TCFD.TDTP -999.250 TSCN.TDTP -999.250
TSCF.TDTP -999.250 INND.TDTP -999.250 INFD.TDTP -999.250 GRCH.TDTP 34.344
TENS.TDTP -999.250 CCl.TDTP -999.250
** END OF DATA *Ic
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
21-JUL-1995 2Ø:Ø2
**** FILE TRAILER ****
FILE NAME EDIT .ØØ3
SERVICE FLIC
VERSION ØØ1CØ1
DATE 95/Ø7/21
MAX REC SIZE 1Ø24
FILE TYPE LO
LAST FILE
**** FILE
FILE NAME
SERVICE
VERSION
DATE
MAX REC SIZE
FILE TYPE
LAST FILE
HEADER ****
EDIT .ØØ4
FLIC
ØØ1CØ1
95/Ø7/21
1Ø24
LO
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and back round counts;
arithmetic average of edited static baseline passes for al I other curves.
DEPTH INCREMENT ø.søøø
=If:
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
--------------
TDTP
$
REMARKS:
=If:
LIS FORMAT DATA
------------
2, 3, 4,
The arithmetic average of passes 2, 3 & 4 (11622) to
1Ø678» and pass 4 only (12942) to 11622» was computed
after al I depth shifts and clipping was appl ied.
$
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
------------------------------
TYPE
REPR CODE
VALUE
------------------------------
1
2
3
4
5
66
66
73
66
66
ø
ø
8Ø
1
PAGE:
12
LIS Tape Verification ~isting 21-JUL-1995 2Ø:Ø2 PAGE: 13
Schlumberger Alaska Computing Center
------------------------------
TYPE REPR CODE VALUE
------------------------------
6 73
7 65
8 68 Ø.5
9 65 FT
11 66 12
12 68
13 66 ø
14 65 FT
15 66 68
16 66 1
ø 66 1
------------------------------
** SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
SIGM PNAV CU 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
TPHI PNAV PU-S 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
SBHF PNAV CU 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
SBHN PNAV CU 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
SIGC PNAV CU 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
SIBH PNAV CU 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
TRAT PNAV 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
SDSI PNAV CU 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
BACK TDTP CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
FBAC TDTP CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
TCAN PNAV CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
TCAF PNAV CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
TCND PNAV CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
TCFD PNAV CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
TSCN PNAV CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
TSCF PNAV CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
INND PNAV CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
INFD PNAV CPS 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
GRCH TDTP GAP I 5Ø6247 øø øøø øø ø 4 1 1 4 68 øøøøøøøøøø
---------------------------------------------------------------------------------------
** DATA **
DEPT. 12942.ØØØ SIGM.PNAV 17.146 TPHI. PNAV 3Ø.281 SBHF.PNAV 36.Ø4Ø
SBHN.PNAV 47.367 SIGC.PNAV Ø.488 SIBH.PNAV 68.14Ø TRAT.PNAV 1.957
SDSI.PNAV Ø.4Ø7 BACK.TDTP -999.25Ø FBAC.TDTP -999.25Ø TCAN.PNAV 27496.457
TCAF.PNAV 1Ø413.15Ø TCND.PNAV 2Ø417.52Ø TCFD.PNAV 6251.Ø32 TSCN.PNAV 6151.711
TSCF.PNAV 2329.7Ø7 INND.PNAV 1323.598 INFD.PNAV 246.372 GRCH.TDTP -999.25Ø
29.038
1.529
49148.109
9612.068
-999.250
14
PAGE:
ARCO ALASKA INC, D.S. 18-18A, PRUDHOE BAY, 50-029-21872-01
****
SERVICE
DATE
ORIGIN
REEL NAME
CONTINUATION :11=
PREVIOUS REEL
COMMENT
REEL TRAILER ****
NAME : EDIT
95/07/21
FLIC
95247
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 95/07/21
ORIGIN : FLIC
TAPE NAME : 95247
CONTINUATION :11= : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA INC, D.S. 18-18A, PRUDHOE BAY, 50-029-21872-01
15.399 SBHF.PNAV
54.519 TRAT.PNAV
-999.250 TCAN.PNAV
10575.818 TSCN.PNAV
295.902 GRCH.TDTP
TPHI.PNAV
SIBH.PNAV
FBAC.TDTP
TCFD.PNAV
INFD.PNAV
12.398
0.554
-999.250
25511. 516
1424.937
21-JUL-1995 20:02
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : 001C01
DATE : 95/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
** END OF DATA **
SIGM.PNAV
SIGC.PNAV
BACK.TDTP
TCND.PNAV
INND.PNAV
10678.500
44.626
0.195
25868.711
5059.445
DEPT.
SBHN.PNAV
SDSI. PNAV
TCAF.PNAV
TSCF.PNAV
LIS Tape Verification Listing
Schlumberger Alåska C;mputing Center
·
·
·
·
·
·
·
·
~~
J-'"'
IF. ~ )7 7 R E ( E I V E D
o ALA~KA INC
Alaska Oil & Gas Cons. Commission
_S. 18 - IgÃ
RUDHOE BAY
'RECE
.
.
.reline Services
(ROfllMED
===
Date
M
tlaska Oil &
·
I
·
·
/'-"
/"-" ^
(/.... /.... /'"
J'" ~"'" /'.
¡Ò,,>~ /,b...~~
1,..,(-"1...
¡ /~~~
NEUTRON REPEAT SECTION WAS RECORDED OVER ZONE OF
INTEREST AT CUSTOMER'S REQUEST.
BOW SPRING NOT USED DUE TO HOLE SIZE.
GR SPIKE ON MAIN PASS AT 10616' IS DUE TO PCL
OPERATION
AN INTERMITTENT ACOUSTIC TOOL FAILURE RESULTED IN AN
INCOMPLETE DATA SET.
THE DOWN PASS WAS THE LARGEST RECORDED INTERVAL AND IS
THEREFORE PRESENTED AS THE ACOUSTIC MAIN PASS.
INCREASED GAMMA RAY VALUES ARE DUE TO NEUTRON ACTIVA-
TION OF THE FORMATION DURING THE DOWN PASS.
ACOUSTIC SPIKING IS DUE TO PIPE CONVEYED LOGGING
OPERATION.
REPEAT UP PASS IS PRESENTED FROM TD-11700'. THE TOOL
QUIT AFTER 11700'.
ACjCNjGR.
LOGS WITNESSED BY: D. STEARNS & C. DIXON.
CIRCULATION STOPPED AT 18:30, 13-MAR-95.
PIPE CONVEYED LOGGING OPERATION.
#
REMARKS:
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
7.000 9726.0
STRING 6.000 12011.0
1ST STRING
2ND STRING
3RD STRING
PRODUCTION
#
WELL CASING RECORD
48.22
46.82
17.30
205
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
19
IIN
15E
406
RUN 3
RUN 2
RUN 1
6388.00
J. DAHL
SEE REMARKS
JOB NUrlBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
D.S. 18 - 18A
500292187201
ARCO ALASKA INCORPORATED
ATLAS WIRELINE SERVICES
24-MAR-95
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
rape Subfile·2 is. type: LIS
NEUTRON LOG PARAMETERS: SANDSTONE MATRIX,
CALIPER CORRECTION = 6.0",
CASING CORRECTIONS OFF,
CHISM FILTERING ACTIVE,
SALINITY = 0.00 PPM.
$
#
BASELINE CURVE FOR SHIFTS: GR from Neutron main pass.
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH
NPHI GRA DT
9729.5
9737.0
9741.0
9748.5
9753.0
9790.5
9803.5
9860.5
9871.0
9956.0
9982.5
9996.0
10295.0
10479.0
10554.5
10562.5
10593.5
10620.0
10741.5
10793.5
FILE HEADER
FILE NUMBER:
EDITED OPEN HOLE MAIN
All tool strings;
hole data.
DEPTH INCREMENT:
#
FILE sur1r·1ARY
PBU TOOL CODE
GR
2435
GRA
BCS
$
BASELINE
9730.5
9737.0
9741.5
9749.0
9753.0
9790.5
9803.5
9860.5
9871.0
9955.5
9982.5
9996.0
10295.5
10479.0
10554.0
10562.0
10593.5
10620.0
10741.5
10793.5
10887.5
10889.5
10911.0
10922.5
10973.0
10978.0
10978.5
10990.5
10993.5
11012.0
11013.0
11017.5
11018.5
11020.0
11022.0
11027.0
11028.0
11028.5
11039.5
11044.0
DEPTH
1
PASS
depth shifted and clipped curves; all runs merged; no case
.5000
START DEPTH
9725.0
9725.0
10815.0
10910.0
STOP DEPTH
11963.0
11968.0
11963.0
12000.0
---------
10887.0
10889.0
10911.0
10922.5
10973.0 10973.0
10977.0
10978.5
10990.0 10990.0
10994.0 10994.0
11012.0 11012.0
11012.5 11012.5
11017.0 11017.0
11017.5 11017.5
11020.0
11022.5 11023.0
11026.0
11026.5
11027.0
11040.0 11040.0
11043.0 11043.0
11065.0 11064.0
11065.5 11065.5
11073.0 11072.5 11072.5
11078.5 11079.0
11080.5 11080.0
11081.5 11080.5
11085.0 11084.5 11084.5
11110.5 11107.5 11107.5
11111.0 11108.0 11108.0
11141.5 11140.5 11140.5
11142.0 11141.0 11141.0
11151.5 11149.5
11158.5 11158.0 11158.0
11163.5 11162.0
11166.5 11165.5 11165.5
11169.5 11169.0 11169.0
11170.5 11169.5 11169.5
11175.5 11175.0 11173.5
11181.5 11179.5
11186.0 11184.0
11200.5 11198.5
11236.0 11235.0 11235.0
11237.0 11235.5 11235.5
11239.5 11238.0 11238.0
11240.0 11239.0 11239.0
11252.0 11251.0 11251.0
11264.0 11265.0
11275.5 11275.5 11274.5
11289.0 11288.5 11288.5
11291.5 11290.5 11290.5
11300.0 11300.0 11300.0
11302.0 11302.0 11302.0
11303.0 11302.5 11302.5
11320.5 11320.0 11320.0
11321.0 11321.0 11321.0
11323.5 11323.5 11323.5
11325.5 11325.0
11346.5 11345.0
11355.0 11354.5
11359.0 11358.5 11358.5
11361.5 11361.5
11364.5 11364.0
11381.0 11380.5 11380.5
11386.5 11384.5 11384.5
11387.0 11387.0
11395.5 11393.5 11393.5
11418.5 11417.5 11417.5
11419.0 11418.5 11418.5
11428.0 11427.5 11427.5
11429.0 11428.0 11428.0
11439.0 11438.0 11438.0
11443.5 11442.5 11442.5
11493.5 11492.0 11492.0
11494.5 11494.5
11501.5 11499.5
11504.5 11503.0 11503.0
11594.0 11593.0 11593.0
11597.0 11596.5 11596.5
11604.5 11604.0 11604.0
11605.5 11604.5 11604.5
OPEN HOLE portion of MAIN PASS.
ACOUSTIC PASS DATA WAS LOGGED DOWN.
"GRA" REFERS TO THE GAMMA RAY RECORDED ON THE ACOUSTIC
MAIN PASS.
SOURCE
CODE RUN NO. PASS NO. MERGE TOP MERGE BASE
1 6 9725.0 11963.0
1 6 9725.0 11968.0
1 3 10815.0 11963.0
1 3 10910.0 12000.0
11949.0
11949.5
11950.5
11954.5
11957.5
11944.0
11922.5
11923.0
11907.0
11913.0
11914.5
11775.0
11794.5
11826.0
11834.0
11850.5
11867.0
11733.0
11742.5
11756.5
11757.0
11645.5
11653.5
11654.0
11680.0
11681.5
11689.0
11691.0
11698.5
11703.0
11709.0
11724.5
11725.0
11730.0
11615.0
11616.0
11633.5
11949.0
11949.5
11950.5
11954.5
11957.5
11944.0
11922.5
11923.0
11907.0
11913.0
11914.5
11794.5
11826.0
11834.0
11850.5
11867.0
11733.0
11742.5
11756.5
11757.0
11775.0
11653.5
11654.0
11680.0
11681.5
11689.0
11691.0
11698.5
11703.0
11709.0
11724.5
11725.0
11730.0
11641.0
11643.5
11646.5
11615.0
11616.0
11948.5
11945.5
11922.0
11904.5
11777.5
11733.5
#
REMARKS:
#
MERGED DATA
PBU TOOL
GR
2435
GRA
BCS
$
11616.0
11617.5
11635.5
11641.5
11644.0
11647.0
11647.5
11656.0
11656.5
11683.0
11684.5
11691.0
11693.5
11701.0
11706.0
11713.0
11728.0
11728.5
11733.0
11733.5
11736.0
11744.0
11758.0
11759.0
11777.0
11777.5
11796.0
11827.5
11836.5
11852.5
11869.5
11905.0
11909.0
11915.0
11916.5
11921.5
11924.5
11925.5
11946.0
11946.5
11949.5
11952.0
11952.5
11953.0
11957.0
11957.5
$
59398 datums
Rep Code: 68
LIS representation code decoding summary:
**** FILE TRAILER ****
Feet
Tape File start Depth =
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units
12009.000000
9725.000000
0.500000
Total Data Records: 241
994 BYTES *
(TYPE# 0)
* DATA RECORD
/??MATCH1.0UT
/??MATCH2.0UT
/??MATCH3.0UT
$
#
CN : ARCO ALASKA INCORPORATED
WI'\J : D.S. 18 - 18A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORNAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
12 Curves:
API API API API
Log Crv Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR 2435 68 1 GAPI 4 4 98 211 23 1
2 NPHI 2435 68 1 PU-S 4 4 98 211 23 1
3 FUCT 2435 68 1 CPS 4 4 98 211 23 1
4 NUCT 2435 68 1 CPS 4 4 98 211 23 1
5 l'ITEM 2435 68 1 DEGF 4 4 98 211 23 1
6 TEND 2435 68 1 LB 4 4 98 211 23 1
7 TENS 2435 68 1 LB 4 4 98 211 23 1
8 GR BCS 68 1 GAPI 4 4 20 789 90 0
9 DT BCS 68 1 US/F 4 4 84 653 71 5
10 I\1TEM BCS 68 1 DEGF 4 4 20 789 90 0
11 TEND BCS 68 1 LB 4 4 20 789 90 0
12 TENS BCS 68 1 LB 4 4 20 789 90 0
-------
48
. NUC~, FUCT, MTEM, TEND, & TENS FROM THE NEUTRON MAIN
PASS WERE SHIFTED WITH NPHI.
MTEM, TEND, & TENS FROM THE ACOUSTIC MAIN PASS WERE
SHIFTED WITH DT.
'rape Subfile:' 2
Minimum record length:
Maximum record length:
502 records...
62 bytes
994 bytes
Total Data Records: 7
API API API API
Log Crv Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GRCH 2435 68 1 GAPI 4 4 08 501 10 0
2 NPHI 2435 68 1 PU-S 4 4 52 326 75 5
3 FUCT 2435 68 1 CPS 4 4 84 023 70 1
4 NUCT 2435 68 1 CPS 4 4 83 368 34 1
5 TEND 2435 68 1 LB 4 4 19 912 29 5
6 TENS 2435 68 1 LB 4 4 19 912 29 5
-------
24
* DATA RECORD (TYPE# 0) 1014 BYTES *
6 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
(TYPE# 64)
* FORrlJA T RECORD
ARCO ALASKA INCORPORATED
D.S. 18 - 18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
CT'J
VJN
FN
COUN
STAT
#
$
CASED HOLE portion of MAIN PASS.
DUE TO THE SHORT INTERVAL NO DEPTH SHIFTS WERE APPLIED.
#
REMARKS:
BASELINE DEPTH
$
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
STOP DEPTH
9725.0
9725.0
START DEPTH
9602.0
9602.0
FILE HEl-\DER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped
PASS NUMBER: 6
DEPTH INCREMENT: .5000
#
FILE sm·1MARY
PBU TOOL CODE
GRCH
2435
$
curves for open hole logs run into casing.
Tape Subfile 3 is type: LIS
Tape File start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units
=
9725.000000
9601.000000
0.500000
=
= Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 1744 datums
Tape Subfile: 3 36 records. . .
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
KCL/POLYMER
9.00
56.0
9.3
6.0
175.0
6.000
9726.0
9725.0
TOOL NUMBER
3944XA
3974XA
2806XA
1309XA
3921NA
2435XA
3506XA
3921NA
3921NA
1609EA/1603MA
14-MAR-95
FSYS REV. J001 VER. 1.1
1830 13-MAR-95
2223 14-MAR-95
12011.0
12007.0
9725.0
12000.0
1500.0
BOREHOLE CONDITIONS
IvJUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
T:1UD PH:
FLUID LOSS (C3):
l-1AXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
#
BOTTOM)
TOOL TYPE
SWIVEL SUB
CABLEHEAD TENSION
TEMPERATURE
GAMMA RAY
KNUCKLE JOINT
COMPENSATED NEUTRON
PULSE CODE MODULATOR
KNUCKLE JOINT
KNUCKLE JOINT
BHC ACOUSTILOG
TOOL STRING (TOP TO
VENDOR TOOL CODE
S \\7 I V
CHT
TEIvIP
GR
1< ¡..J JT
0]"T
"'-..... ! ';
PCI'·1
Kr·J JT
I<:I'T JT
Þ.C
$
#
#
LOG HEADER DATA
DATE LOGGED:
SOFT\IJARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NID1BER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 6
DEPTH INCREMENT: .2500
#
FILE SUMMARY
VENDOR TOOL CODE
GR
2435
AC
$
STOP DEPTH
11964.0
11973.0
12002.0
START DEPTH
9602.0
9602.0
11698.0
Tape Subfile 4 is type: LIS
* FORt·1AT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth 1D: F
11 Curves:
API API API API
Log Crv Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR 2435 68 1 GAPI 4 4 08 501 10 0
2 CNC 2435 68 1 PU-S 4 4 98 211 23 1
3 Cl'YCF 2435 68 1 PU-S 4 4 98 211 23 1
4 CN 2435 68 1 PU-L 4 4 52 326 75 5
5 LSN 2435 68 1 CPS 4 4 84 023 70 1
6 SSN 2435 68 1 CPS 4 4 83 368 34 1
7 T EI"IP 2 4 3 5 68 1 DEGF 4 4 18 487 70 6
8 CHT 2435 68 1 LB 4 4 19 912 29 5
9 TTEN 2435 68 1 LB 4 4 19 912 29 5
10 SPD 2435 68 1 F/MN 4 4 54 376 29 5
11 AC AC 68 1 US/F 4 4 48 852 89 1
-------
44
* Dl-\TA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 459
Tape File Start Depth = 12009.000000
Tape File End Depth = 9601.000000
Tape File Level Spacing = 0.250000
ARCO ALASKA INCORPORATED
D.S. 18 - 18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
COUN
STAT
FIT
í.J T-T
""'-1' .,
#
$
NEUTRON MAIN PASS, ACOUSTIC REPEAT PASS.
(AS PRESENTED ON BLUELINES, BUT LOGGED ON
THE SAME PASS).
REMARKS:
. 0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) :
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
#
#
THERMAL
SANDSTONE
.00
6.000
#
67.0
175.0
74.0
.0
70.0
.0
.066
.027
.079
.000
.149
.000
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
Tape Filé Depth units
= Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 174995 datums
Tape Subfile: 4 540 records. . .
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
.066 67.0
KCL/POLYMER
9.00
56.0
9.3
6.0
175.0
6.000
9726.0
9725.0
TOOL NUMBER
3944XA
3974XA
2806XA
1309XA
3921NA
2435XA
3506XA
3921NA
3921NA
1609EA/1603MA
14-MAR-95
FSYS REV. J001 VER. 1.1
1830 13-MAR-95
1758 14-MAR-95
12011.0
12007.0
10909.0
12000.0
1200.0
BOREHOLE CONDITIONS
HUD TYPE:
MUD DENSITY (LB/G):
I/fUD VI SCOSITY (S):
I-TUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
#
BOTTOM)
TOOL TYPE
SWIVEL SUB
CABLEHEAD TENSION
TEMPERATURE
GAMMA RAY
KNUCKLE JOINT
COMPENSATED NEUTRON
PULSE CODE MODULATOR
KNUCKLE JOINT
KNUCKLE JOINT
BHC ACOUSTILOG
CHT
T EI'IP
GR
YN,JT
CN
Pcr·1
KNJT
KNJT
Þ.C
$
S \.\} I \1
TOOL STRING (TOP TO
\7ENDOR TOOL CODE
#
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TO DRILLER (FT):
TO LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
FILE HEADER
FILE NUMBER: 4
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING Nrn~BER: 1
PASS NUMBER: 3
DEPTH INCREMENT: .2500
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10811.0
AC 10909.5
$
STOP DEPTH
11963.0
12000.5
Tape Subfile 5 is type: LIS
35576 datums
Rep Code: 68
LIS representation code decoding summary:
**** FILE TRAILER ****
Tnpe File start Depth = 12003.000000
Tape File End Depth = 10795.000000
Tape File Level Spacing = 0.250000
Tape File Depth units = Feet
Total Data Records: 135
(TYPE# 0) 1014 BYTES *
* Df\TA RECORD
* FORMi'\T RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth 10: F
6 Curves:
API API API API
Log Crv Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR AC 68 1 GAPI 4 4 06 969 49 6
2 AC AC 68 1 US/F 4 4 48 852 89 1
3 TEMP AC 68 1 DEGF 4 4 61 008 99 5
4 CHT AC 68 1 LB 4 4 95 558 30 1
5 TTEN AC 68 1 LB 4 4 95 558 30 1
6 SPO AC 68 1 F/MN 4 4 61 094 30 1
-------
24
ARCO ALASKA INCORPORATED
D.S. 18 - 18A
PRUDHOE BAY
NORTH SLOPE
ALASKA
S'I' 7\ T
COUN
CN
hTN
1='1"
#
ACOUSTIC MAIN PASS, LOGGING DOWN.
$
REMARKS:
. 0
TOOL STANDOFF (IN):
#
#
.00
.000
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) :
riIA TRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
175.0
74.0
.0
70.0
.0
.027
.079
.000
.149
.000
MUD ÄT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
r1UD CAKE AT BHT:
62 bytes
1014 bytes
213 records...
Minimu~ record length:
Maximum record length:
Tape Subfile: '5
.066 67.0
.027 175.0
.079 74.0
KCL/POLYMER
9.00
56.0
9.3
6.0
175.0
6.000
9726.0
9725.0
TOOL NUMBER
3944XA
3974XA
2806XA
1309XA
3921NA
2435XA
3506XA
3921NA
3921NA
1609EA/1603MA
14-MAR-95
FSYS REV. JOOl VER. 1.1
1830 13-MAR-95
1740 14-MAR-95
12011.0
12007.0
9725.0
12000.0
1200.0
BOREHOLE CONDITIONS
I\IUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
I·TUD PH:
FLUID LOSS (C3):
T'.TP·YIf''1UM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
#
$
BOTTOM)
TOOL TYPE
SWIVEL SUB
CABLEHEAD TENSION
TEMPERATURE
GAMMA RAY
KNUCKLE JOINT
COMPENSATED NEUTRON
PULSE CODE MODULATOR
KNUCKLE JOINT
KNUCKLE JOINT
BHC ACOUSTILOG
Þ.C
e'··T
PCT.'l
KNJT
}«N JT
1< T"·T I-J T
EL'1P
eFT
S \ I,: ~[ '\l
TOOL STRING (TOP TO
vENDOR TOOL CODE
#
#
LOG HEi\DER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TO GRILLER (FT):
TO LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
10988.0
10997.0
START DEPTH
10700.0
10700.0
FILE HEADER
FILE Nill/IBER:
RAW OPE:N HOLE
Curves and
files.
RUN NUI:IB ER :
TOOL STRING NUMBER:
PAS S NUI'·TB ER :
DEPTH II'TCREMENT:
#
FILE Sill·1I"lARY
VENDOR TOOL CODE
GR
2435
$
1
1
2
.2500
5
REPEAT PASSES
log header data for each pass, tool string, and run in separate
Tape Subfile 6 is type: LIS
API API API API
Log Crv Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR 2435 68 1 GAPI 4 4 08 501 10 0
2 CNC 2435 68 1 PU-S 4 4 98 211 23 1
3 CNCF 2435 68 1 PU-S 4 4 98 211 23 1
4 CN 2435 68 1 PU-L 4 4 52 326 75 5
5 LSN 2435 68 1 CPS 4 4 84 023 70 1
6 SSN 2435 68 1 CPS 4 4 83 368 34 1
7 TEI':IP 2435 68 1 DEGF 4 4 18 487 70 6
() CHT 2435 68 1 LB 4 4 19 912 29 5
OJ
9 TTEN 2435 68 1 LB 4 4 19 912 29 5
10 SPD 2435 68 1 FjMN 4 4 54 376 29 5
-------
40
* DÞ,TA RECORD (TYPE# 0) 1018 BYTES *
Total Data Records: 59
Tape File Start Depth = 11033.000000
Tape File End Depth = 10697.000000
Tape File Level Spacing = 0.250000
Tape File Depth units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
10 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
* FORMAT RECORD (TYPE# 64)
en : ARCO ALASKA INCORPORATED
W~ : D.S. 18 - 18A
FN : PRUDHOE BAY
COTJN : NORTH SLOPE
STAT : ALASKA
#
NEUTRON REPEAT PASS.
$
REMARKS:
. 0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) :
T"I;\TRIX:
HATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
#
#
THERMAL
SANDSTONE
.00
6.000
#
.0
70.0
.0
.000
.149
.000
MUD F"ILTRATE AT BHT:
IvIUD CAKE AT MT:
MUD CAKE AT BHT:
62 bytes
1018 bytes
135 records...
Minimum record length:
Maximum record length:
Tape Subfile: 6
>189791 datums
68
Rep Code:
SYSTEM RETURN CODE = 0
26.36 seconds.
Elapsed execution time
End of execution: Fri 24 MAR 95 8:42a
132 bytes
132 bytes
Minimum record length:
Maximum record length:
2 records...
Tape Subfile: 7
01
95/ 3/24
**** REEL TRAILER ****
01
95/ 3/20
Tape Subfile 7 is type: LIS
NOTICE
The following well logs and oversized
documents have been placed in offsite
storage. If you would like to view the
original documents, please contact the
AOGCC librarian.
AOGCC
3/4/2005
.KCL/POL YMER
9.Ø PPG
9.3 STRIP
CIRCULATED
0.Ø66 OHMM
0.079 OHMM
ø. 149 OHMM
MEASURED
ø·. Ø27 OHMM
24.HRS,
175
HL 6531
J. DAHL
D. STEARNS/
14-MAR-95
---
I
I 597T5 .-..<'.
120 II·
12ØØ7' DID NOT TAG
11968'
----....
972S'~~'..~__d2~~;~~:':~~:
7". .__ ~ 9726 '
'---..---,
2"::10Ø' / S"::IØØ' ILOCATION=
SURFACE :,
FINAL PRINT I 406' FNl~. ~, é?0S' FWL
..... '"
C. DIXON
I--
<=> .
:z.o
--'
--' ;>-
~:~.'..æ.
:I"I;Ρ
CŸ- 'LtJ . .-,;-
.W-IOC .... <a::,
:I;!:;;I::
:~æ,~
=;""U..;'·
,.,' ".i~'
,',.., . (;;.)'.', ø
,.~,"~3
·LU oc .~
¡x:....c:::> ,;ß' '"
LLI '. P .::;).
,go¿,·æ
ª C? ."ex;
'g; "~)~
,,~"ªg'
i~..~·8
'~'~ ."'.iJ
,I';-h P:
9':±:'~
. ,.t:::. \:~,!Z,' "d
;'::5 ~"~,
ffi æ ;:=.',
,;·2~····'
'i: g"ê5
;~.~'~,'
tA .1CII".ê5
B ,. ~..". c-.:o
UJ .¡....;,.<i3"
=> ~.,cx.
ø=u..J
~ 5,~
g~~
=
t:]u):3:
LLlt--cn
bas~
---I::E:::=
O-~LLI
:II:: => 0-
.l.LJ ~ ~
0:::. t.U
= :Ii::: a<:
C) C)
0.::
en LLJ -
o:!:I = cn
C) I-- LLI
-'C:>~
u.. '0.:: ::E::
c:>c)g;
<.rJ --'
:z: <I:: -
c:><-JCr.J
;= ~.~
a: 1--.---1
I--::i;:o-
~¡:¡jæ
Lu ~ð~
~ 3· E:: ::::;
::c ~ ::3 ~
:z: <.J ---
r--.. ....... = Cr.J
'--' :..c: Lt..I =
-1 .a: e><: C)
r--.. :¡;:= u..J CL..
'-" ' '-'- U")
l.L == = LLI
p--f --' c:t::
. -\ NORTH SLOPE
~
~ 67 DEGF
~ 74 DEGF
t! 70 DEGF
. MEASURED
~ 175 DEGF
~
~
~
56 SEC/QT
6.Ø CC
~
..---------.---
. TWP IIN RGE ISE
48.22 FT ~L~~~~~O~E~ANE~Ø :D~~~~+ KO ~~~~:J~ONS
OF, 46.,82' ,
'GL'''I 1':'30'
.?'
AReO·'ALASKA I NCORPOnA TED
0: S" 18 - ,I SA )JIOJ '"'èß¡j
PRUDHOE J~A y
NORTH SLOPE
r·....
_6 "
;PERMANENT DATUM . M.S:·~.
LOG MEASURED FROM R :K. B.
DRILL. MEA5. ·FROMR.K.B.
DATE
RUN -.".
SERVICE ORDER
'DEPTH DRIlLER
:g,DEPTH LOGGER
BOTTOM LOGGED INTERVAL
,..
TOP . LOGGED INTERVAL-
£RSING - DRILLER
·CASING·LOGGER
BIT SIZE
TYPE FLUID I~ HOLE
-DENSITY / VISCOSITY
PH / FLUID LOSS
SOURCE OF SAMPLE
RM AT ME AS. TEMP.
RMF AT MEAS. TEM~.
RMC AT MERS. TEMP.
SOURCE' OF RMF /. RMC
RM AT BHT
TIM[.:8INCE CIRCl1LATION .
MAX. REÇ. TEMP.DEG. \F
~QUIP. ·NO. / LOCATION
-'-'~------
RECORDED BY'
WITNESSED BY
._-_._~-----
9725'
SEC 19
COtl~ANY
WELL
FIELD
COUNTY
API NO.
'50 Ø(~9 21 872 ø I
,FILE NO.· 63:g'8~OO'
Gamma Ray
Åti~~ \vi r~Ù-~~':~ Se't~:i~~~-'- -- -. --- .-- - -
C ö r:n Þ ens a. t e~\d
...ERN
LAS
¡ 1-
#
[~\
, - ~ - · : ~ ,) -- I /-{
MAR 28 19.qs.... r&íí. Compensated NEUTRON
wa:STERN
Alaska Oil & Gas Gons. CommissicA'TLAS
-----------Anchoragfl...--------.-----.------. G am maR a y
Átias wireiine Services
FI LE ND. 6388.00
COMPANY ARCO ALASKA INCORPORATED
WELL D. S. 18 - 18A
FIELD PRUDHOE BAY
COUNTY NORTH SLOPE STATE ALASKA
¡WI NO.
50 Ø29 218/2 01
2"= I øø' / 5"= I øø' LOCIîT ION:
SURFACE:
FINAL PRINT 406' [':NL & 2ØS' FWL
OTHER 5ERUICE5
BHC/AL-GR
SEC 19
TWP IIN
RGE ISE
PERMANENT ornUM M. S. L.
LOG MEASURED FROM R.K.Ð.
DRILL. HEAS. FROM R.K.B.
DATE 14-MAR-95
RUN I
-_.._-_._-~._---------- ,.-
SERVICE ORDER 159775
--.,-----
DEPTH DRILLER 1201 I'
~_.__._-~---
DEPTH LOGGER 12007' DID NOT TAG
BOTTOM LOGGED INTERVAL 11968'
--- ------------ -
TOP LOGGED INTERVAL 9725'
-----.--.--.. -------_.,.-..~,_.._.-.'---_._-- -------"
CASING - DRILLER 7" ~9726' º
-- ..--.....
CASING LOGGER
-_.~
BIT SIZE 6"
TYPE FLUID IN HOLE KCL/POLYMER
W;NSIT~~~~~{J;~ .~: frr~p- ]i~~~aT-~---==f-----=
SOURCE OF SAMPLE CIRCULATED
---------------- -----.------.------ ------
r~M AT ME AS . TEMP. 0. Ø66 OHMM ~ 67 DEGF ~
--- -,------...--.-.-..--.-.--.---------.--...-.-.- ---.----.----.-----" --~-----_...- -----_. -----.------.--'.,--.- -.-..------..-
RMF AT MEAS. TEMP. ø.ør90llMM 0(4 DEGf º
- .,.-.-.-.--.---. -,---_.__._---~------ -------.-----.-
RMC AT ME AS . TEMP. 0. 149 OHMM P 70 DEGF ~
~~Q~!RC_~___.º-~_ R~f._.~_. RM~=~=_ MEASUR~º.___IMEJlliY._RID _~=~ _.__.._____J______~
RM AT BHT ø. Ø27 OHMM P Irs DEGF @
.--. ..-.---------. .,-- ---_._~._------- ---.-.-------
rIME SINCE crRCUUHrON 24 HRS.
.-., .---.-.-.-----..-. -.---.------ ---.---- ,----_....-._--------- ---- --- -.---.-"- ---.._-.' - ----_._-"------------
MAX. REC. TEMP. DEG_ r 175
E9~lP· __ÑO ~-I n~~OC-f:Ù:- I oÑ:=-- -~iL-6-~·lI_ ~=_=r~oRI~I-sLõPE- ====-·-r____ (
~_~_ÇORQs. Q._!3_1______. _ __._ _._ _.L~~B H ~_ _____ ___ _..__________________ :
WITNESSED BY D. 51·EARNS I C. O[XON
ELEUATION 0.Ø' FT. ELEUATIONS
48.22 FT. nSOUE PERMANENT DATUM ~~ ~~ ~ ~~:
GL 1 7 . 30 '
---.----.----
----------_._-~..,..---
----.-------
9725'
-.----- -
#
(d· (
RECEIVED cr ç- - / C)
MAR .2 8 1995 r&iI. S~b-Sea
Ala5kaOil&Gas.~MrAS Compensated NEUTRON
Anchorage . .
CMWD DIrectional Survey)
I
Atias Wireiine Services
FILE NO.
6388.00
COMPANY ARCO ALASKA INCORPORATED
WELL D. S. 18 - 18A
FIELD PRUDHOE BAY
COUNTY NORTH SLOPE STATE ALASKA
API NO.
50 029 21872 01
2"=10Ø' / S"=IØØ' LOCATION:
SURFACE:
fiNAL PRINT 4Ø6' FNL & 2ØS' FWL
OHlER SERUICES
BHC/AL-GR
SEC 19
TWP IIN
RGE ISE
PERMANENT DATUM M.S.L. ELEVATION ø.ø' FT. ELEVATIONS
LOG MEASURED FROM R.K.B. 49.22 FT. ABOVE PERMANENT DATUM KB 48.22'
OF 46.82'
DRILL. MEAS. FROM R.K.Ð. GL 17.3Ø'
DATE 14-MAR-95
RUN I
SERVICE ORDER IS9'775
DEPTH DRILLER 12ØII'MD
DEPTH LOGGER 12ØØ7' DID NOT TAG
BOTTOM LOGGED INTERVAL I 1968' MD
TOP LOGGED INTERUAL 9725'MD
,-.
CASING - DRILLER 7" ~ 9726' MD ~
CASING LOGGER 972S'MD
BIT SIZE 6"
TYPE FLUID IN HOLE KCL/POLYMER
DENSIT1 I VISCOSITY 9.Ø PPG 56 SEc/aT I
PH I FLUID LOSS 9.3 STRIP 6.Ø CC I
SOURCE OF SAMPLE CIRCULATED
RM AT MEAS. TEMP. Ø.Ø65 OHMM ~ 67 DEGF ~
._--------
RMF AT MEAS. TEMP. Ø.Ø79 OHMM ~ 74 DEGF ~
RMC AT MEAS. TEMP. ø. 149 OHMM ~ 7Ø DEGF ~
SOURCE OF RMF I RMC MEASURED MEASURED I
RM AT ßHT Ø.027 OHMM ~ 175 DEGF º
TIME SINCE CIRCULATION 24 HRS. I.
f'
1-- I.
MAX. REC. TEMP. DEG. F 175
~ -
EQUIP. NO. I LOCATION HL 5531 NORTH SLOPE (
RECORDED BY J. DAHL (
n I,
WITNESSED BY D. STEARNS / C. DIXON
··U····.5R.·\ '.d.::.',
,f7'
>C-.".'¡:;
(..:1.( L
""""'..-
L:J.:; ,0.::
.0::1......... ..·..i=:.'
. , ..e;;I
~,,:,:::,,~,:,::':,:':"',¿
'i.'5~;~ '
,............~.........I:---
..~....:±: ..... 'i:j;
:-.-........, . . .
DATE I 4-MAR-95tï::~\'~
_____"_______.___ __________ ___ _.__ _______u.J..:¡:¡:.....::
RUN I . ."... .. . .~~,~
.SERU 1 cr- OR5ER--~-- I 59775 --------.- _________~_c___,__~.____~_.__.____ i~'~.ª
-~- .--- ---------------------- I:- '.'
PEPTH IlliJlLE~ -. J1!ll'MO _____. ~<g~
DEPTH LOGGER 12007' 0 I 0 NOT TAG ..~.......~........~
- ---- --------- ----.-.--..-.----- (.O.'c::......e:::;
BOTTOM LOGGED INTERUAL 11968' MD8;æ~
TOP LOGGEDINTERUAL -- 9725~------- ------------- ,..~.....§ê....::
~--- --- ----.-.--- .----.-.----.-.--..._.__.________ ..'-'-'. =: .u.J
CASING - DRILLER 7" ~9726'MO . . @.. ·~.5.~
CASING LOGGER 9725' MD ---- ----------------..----.-..---.----.-.-g.~.~
1-0_,_ ____ ____._.._.__._.__.H~_._~__.___H.~_· =z::
81 T SIZE 6" æ '.0" ~
______________ _____..__.______ LU .=
TYPE FLUI D IN HOLE KCL/POL YMER § .~ ~
DENSJTy-·¡--UISCOSm----·- 9.0' PPG 56 SEC/QT _ __" ~-- ~ .~. §
PH __. I FLUID LOSS__ 9.3 STRIP 5.! CC _______-==C g ~ gs
SOURCE OF SAMPLE CIRCULATED ~ ~ u)
--- ---.-----.-.---. c:> I-- LU
RM AT ME AS . TEMP. 0. Ø66 OHMM ~ 6? DEGF @ --.J C> ~
__ - -- -------- lJ.. 0:::
RMF A1 MEAS. TEMP. Ø.Ø79 OHMM ~74 DEGF .._ . ~ : ~ g;
RMC AT ME~EMP. ø. 149 OHMM ~ 70 DEGF -- _.~==_~=_ @ ___. ê ~ ~
SOURCE OF RMF_~M~_ ~_EASlL~~-º_.__ l!EASU,RED ___ _______~____.~_I_____ ~ g ~
RM AT BHT ø. 027 OHMM ~ 175 DEGF º ~ LLJ <x::
-- -----------------,-.---- --------,-----.-------.----.--- ð 0,::
TIME SINCE CIRCULATION 24 HRS_ ~ ~ 0,:: ~
---- ----:-- -----.--------.---- --....-----.-~ uJ 0---0 LL. LLI
MAX. REC. TEMP. DEG. F 175 ::I: ~ ~ ~
EQ!l! P:~ NO~=~_~.ºÇ8TIQN_~-:·~_-~ ~L_~.§0_1 ~=-==[[º_~DLÆ~Qf_(. _~·::_=-=_==.--~~~~.=-=r___.___ ~ ~ ~ ~
RECORDED B,( J. DP1HL .. ~ ~ ~ ~
--.----. -.--..------....----------- ..--~_._-..---------- --.-----.------------ --.-.--~--..-.. -.-.--.....-.-------- ~ -- 0,::
~~2_TNESSED BY D. STF~ARN5 I C. DIXON 1
EL ElJATI ONS
KB 48 . 22 '
DF 46.82'
GL '"7.30'
PERMANENT DATUM M.S.L.
LOG MEASURED FROM R.K.S.
DRILL. MEAS. FROM R.K.B.
TI,.JP "'N RGE ISE
ELEVATION ø.ø' FT.
48.22 FT. ABOUE PERMANENT DATUM
SEC 19
COUNTY
LOCATION:
SURFACE:
406' FNL & 2ØS· FWL
fiNAL PRINT
OTHER SERUICES
ßHC/AL..-GR
?"=IØØ' /S"=IØØ'
~;TATE ALASKA
ARca ALASKA INCORPORATED
D. S . I 8 - I SA
PRUDHOE BAY
NORTH SLOPE
API NO.
5Ø Ø29 21872 Øl
)-J j O~'c~\,J
COM F) ANY
WE:L.L
FIEL.D
F I IJ NO.
6388.00
Sub-SelJ
Compensated NEUTRON
(MWD Directional Survey)
Atias VVireiine Services
.~'-
"'"'
r'1j r t"" F ~ '~, ~. ~.., ij'I.,¡.,
¡~!o/",:I''' ~.. :". ~ \:4' ~"" .~ ,~
',~ I'."','I~\\ ""'I~'\I'1 h,~r~' II, I') ;';IT~,~, ~, ~~:.
m~l!I"""::.
~ .' . I
". . '~I' ~ . . '¡I"
>, P "¡ ¡'·'t r" l' ,-I.iÞ,;;,;g¡. IIJ~t'
I. \ ~ ,\ ".
'¥'ESTE~~
C'?:Þ':.ATlAS
*.", .,~.;1:",
I
·~;m~/Im.\\\1!~1~' .
-
C:J
_J
o
----I Lt...
I
DATE 14-MAR-95
.__._._____________.__._..____.,~.'_.,,_^"____"_ ___,__"".'N.___.__._,,_~___._._._..·_P_...~____·_,,_.._._._..,.._...".._.__..._...,..._...__.____.... _.~____,..__,.._.,,_.,'_..'_".__.._,..______.____.._______._--.0..
RUN I
'-ŠERUlfË-'-ORDE R ----~--_.---...--..- 1-5~gT75--····-..···_··.._-·_---··--~·-·······-·········---..-.-.. ....--.........-.----........-.......--....-.-.....---.------
-------.----.-----.---.--- -----------------.-..------..-,-.,..-.-"--------.,-.. .--,..,-.----.....-,..-----.,.-.,-.----.--..--.....------.-----
DEPTH DRILLER 12Øl I'
,,-.--- ------..."-.-.----,-....---- -----.-.---..-----.---.----.--...----.---
DEPTH LOGGER 12ØØ7' DID NOT TAG
- -- ------------------,.,-.---...---.. -------,."'---.--
BOTTOM LOGGED INTERUAL 12ØØ0'
_ ._,__.._...__.._.______.._____'____.M__..__..____.._._...._._w.__ _____,.__.__.____,,_________._
TOP LOGGED fNTERUAL IØ9Ø9'
_._~_M_.._·_··_·______~___ ____._____..__".._,__,______.__.__.._..___.._,_~..,_ _,__..__..._._._".,__.,__.~__.~__,.,._._..___._
CASING .- DRILLER 7" @9726' @
- - ....---.-..---....-.------......-.-.--- _._--_._~._----_..-"'...'-_..-.-- -..-...----
CASING LOGGER 9725'
. ---......---.-.---.--
BIT SIZE 6"
---_. --_.
TYPE FLUID fN HOLE KCL/POLYMER
DENSITY / UISCOSITY 9.Ø PPG 56 SEC/QT ~~~=~=~~~===.I·
PH f FLUID LOSS 9.3 STRIP 6.Ø CC
-----~---- ----.--.----.------- -
SOURCE OF SAMPLE CIRCULATED
RM AT ME AS . TEMP. 0.066 OHMM @ 67 DEGF @
-.--------
RMF AT ME AS . TEMP. ø. 079 OHMM ~ 74 DEGF @
--------
RMC AT ME AS . TEMP. 0. 149 OHMM ~ 70 DEGF @
SOURCE OF RMF f·RMC MEASURED MEASURED ~~~~~~=~~=r==
RM AT BHT ø. Ø27 OHMM @ 175 DEGF ~
--------,---,---~------- -------~
TIME SINCE CIRCULATION 24 HRS.
MAX_ REC. TEMP. DEG. F 175
EQUI P. NO. / LOCATl()!'J~ HL~-==L~()RT i[SlOPE F-====:::J~:
RECORDED BY .._~._._ .. __ ,L..Y.B H L____._~__._.______._____. ~____ ._._.._._._.___._____....__..
WITNESSED BY D. STEARNS / C. DIXON
0.::
L.LJ
=>
UJ
o
r..n
t-
<J::
Cf) -=
LLJcn:3:
~ô5æ
S::i5~
~ g;. ~
c..o :><:
o,:<I:L.LJ
=~o::
o 0
~ ~ U)
o I-- UJ
--' c:> ~
LLO<:~
c:>og;
U> --'
= <I: -
oc...:oen
~ _ en
I--CC:O
a::t--.J
I-- "-"
LL1 LLJ >-
o::-.J=
o-'-'-'<r::
u.J I ffi L: 0:: .
oc I-~C>
LLI ;:= u.... I..L..
::r: ~c.r.;~
=LLJCIO
~§i~
~~5
'-'-' CL
~~~
COUNTY
LOCATION:
SURFACE:
406' FNL & 20S' FWL
---~-------- ,..-----.-.---.------.,....------..,------------.-----.- -.-
-----.--.'-----.---.-
-.----..------.-.---------¡j-.---.
ELEVATIONS
KB 4 a . 2(~ '
DF 46 . 82 '
GL 11 . 30 ·
ELEUATfON 0.0' FT.
49.22 FT. ABOLJE PUmANENT DATUM
,-,
~~G ElSE
TWP IIN
OTHER SERUICES
CN-GR
A LASJ(A
ARca ALASKA INCORPORATED
D . S . I 8 - I 8A }-N 0 '2M
PRUDHOE BAY' -J Y
NORTH SLOPE
STATE
I
SEC /9
PERMANENT DATUM M. S .1_..
LOG MEASURED FROM R.K.S.
DRILL. MEAS. FROM R.K.ß.
fiNAL PRINT
2"-IØØ' / 5" IØØ'
API NO.
~)ø Ø29 (~I 872 ø I
FILL NO.
6388.00
Ray
Gamma
·;\¡i~;···\~1t~-¡¡··ri~i~B~t~·¡~~Js~:i~ï:~:;T;:·.:~;~I.;;;~...
1.\ ~:~~ L··I~'. c¡ ~'>~ ~ ',(:'
¡('''' r ~ T\lI!~· 1iT$i~~ m" 'I
>f¡ /~I ·r' i~' !,,~ï'l' :'~ "',, . .':~~ ~ ""~I'~I~Wj~
~",'. ~¡,~ !\ :.~.. ..:~ ~i.,.¡..I" \;.:.".~..
WESTERN . SHC ACOUST I LOG
') 0 f.'LAS
1....1...1 BM!li.fflIJ ."
. .: .~, ," ..,\ '\L 'l 1:'1,;.
COMPANY
WELL
FIELD
"
11
(:;21
1'"'\ rrr.\/r.... c¡ -"' / C-j
1\ L \... L I V L IBI"".:. /
') \E!ff fill iI BHC ACOUSTILOG
MARW . " ERN
Alaska Oil & Gas Cons. conAI!,AS Gamma Ray
... A. ...,. .. ApphOfat\f}
ALIas ""arenite ~crvlces
FILE NO. COMPANY ARCO ALASKA INCORPORATED
6388.00
WELL D. S. 18 - 18A
.. -.
API NO. FIELD PRUDHOE BAY
50 029 21872 01 COUNTY NORTH SLOPE STATE ALASKA
2"=IØ0' / 5"=IØØ' LOCATION: OTHER SERUICES
SURFACE: CN-Gr~
FINAL PRINT 4Ø6' FNL & 2ØS' FWL
SEC 19 TWP IIN RGE ISE
PERMANENT DATUM M.S.L. ELEVATION ø.ø' FT. ELEUATIONS
LOG MEASURED FROM R.K.B. 48.22 FT. ABOUE PERMANENT DATUM KB 48.22'
DF 46.82'
DRILL. MEAS. FROM R.K.B. GL 17.3Ø'
DATE 14-MAR-95
RUN I
SERVICE ORDER 159775
DEPTH DRILLER 12011 '
-
DEPTH LOGGER 12007' DID NOT TAG
BOTTOM LOGGED INTERVAL 12000'
TOP LOGGED INTERVAL 10909'
CASING - DRILLER 7'~ ~ 9726' ~
CAS.ING LOGGER 9725'
...
BIT SIZE 6"
TYPE FLUID IN HOLE KCL/POLYMER
DENSITY / UISCOSITY 9.0 PPG 56 SEC/QT I
PH / FLUID LOSS 9.3 STRIP 6.0 CC I
SOURCE OF SAMPLE CIRCULATED
RM AT MEAS. TEMP. 0.066 OHMM º 67 DEGF ~
~ 74 DEGF @ .-
RMF AT MEAS. TEMP. 0.079 OHMM
~ 70 DEGF ~ -p
RMC AT MEAS. TEMP. 0. /49 OHMM
SOURCE OF RMF / ~MC MEASURED MEASURED I
RM AT SHT 0.Ø270HMM @ I 75 DEGF ~
TIME SINCE CIRCULATION 24 HRS.
MAX. REC. TEMP. DEG. F 175
EQUIP. NO. I LOCATION HL 6531 NORTH SLOPE I
RECORDED BY J. DAHL -.----
WITNESSED BY D. STEARNS / C. DIXON
ç-::
ß
l~l
: "'< ~"~ -
.....,... .-
'~'.' ;'
.\ .
_n' ..~ ______.~___
.. .", .------~ -.... --~ ~ .- ,-
- . '. ... - . '. "', ,~,
-~..'-,._-,- -', -' ..-".......,.,.
- -. - -. ' . ..,~.,.... -~ .. . --"-- ... .. ~ . -'. -
~
~
[~(
lq~ O~'f
I
¡
I
I
I
: r DGWD $'ŸSTË~
I
i
I
¡...,..., 1 r-"
I !
!
NGP
NATURAL GAI\1MA PROBE
Conlpany : ARca ALASKA~ INC.
¡ I
~~ ..J
Z ~ tt{
:J IJ.. ä:
l,!'I
>- (:)
c:( N s;
tQ
W ..; ¡:
~ Z <t
u. m
<ëC æ ~ () sa
(I) I
IJJ ~
=::1 Q,. o:;t (J') ..I
~ c: I
£!
§ ] ~I =gj
(.)
0 0 1:
() LI: ..J
.._._-._.__....."_.'....--_.~._------_..-------_._...._--._-----_."....._..._-",....,'_.'~."".
Rig : N..\HORS 2ES
.._.,...._...'-----~_..- -~'"._.....---.,.._...._,,,--_......-.._,-_.__.,_.'------_._-_.-.-.--.-.--.,...........,'--..-.- ,_.-
d
¡; Well : 18-18A ...
<C ....-..-..---..--.--------.--------~.-.;_~\->:---,.-,...-_.... ..... ....--......-.---...:-......,.-
~ ti) Field : PRUDHOE BAi\uSI'Í' .... .....\..". . ~
~ : ...-----..--..---- -.----.-"--.---~"'":"-1-~;_--4.:'---.-.._:.~;~-~r-.--.----
8 ß Country
0:: «
« z
USA
'"
~ 406 FNL, 205 FWL
()~II ~ _~E~~_._I!.lN_.__~~5E --..------...---
o rn ~ y= 5,961,467.29 X= 691,951.34
æ ...J API# 50-029-21872-01
··ó¡'HéR SERV ICES
. Permanent Datum MEAN SEA LEVEL
Log Meas. From RKB
Drlg. Meas. From: B~.~_________
Elev.: 0.00 ft
--------
48.22 ft Ab.Perm.Oat.
Elev. KB 48.22
OF 46.82
GL 17.30
\'10 0.00
Borehole Record
Size I From I To End Inc.
<in) I <ft TVO) !<ft TVO) (deg)
_____~:.2.º_0__1___ª_536 L.--ª.§.73J 88.9
: I I
~-=--=.~~---t==:~-==-~t-==-~=+ ----
, I I
, I I
¡--.---.¡
! I
Size
<in)
13.375
9.625
7.000
Casing Record
Weight I From i
<lb/ft) I <ft. TVO) !<ft
72.0 ! i 3466
I . ---t--·-
47.7 ! ,8255
I 29:-0--r--"J3082._~__B5~~_
f---~-==-=~~-=--= .
, : I
--.---
if
(;;2(
1 r..:-() I tJ
FINAL TVD
MtE7
I DGWD SYSTEM I
NGP
NATUH.AL GAl\1lVIA PROBE
COlnpany
fl)
: _ARCO ALASKA, . sE.e ElJ.L&D-----
NABORS 2~!S. __ A l!ß 3-O-f~t¡-------- ____
q asha Oil ~ "','
18-18A (, belt; COliS, PI"" ,,'
·--·-A1ìCtm¡:è!le-~·~jfj:~nfrjjf---··----······· .
PH.UDHOE BAY UNIT
Rig
f- ..., Ü
I 2 ~ LU ~
;:) U. 10
I a::
I >- 10 ci
0 ::..::
\ <t N: ~ (I)
cc <t
LU ..; f: ...,
¡ 0 Z <t
:r::: u. en <t 0
<tl Q ~
::) ~ <3 Ü
(1)1 a:: 0 LU f.2 a::
~I Q. o;:t (I) <t
..I
~I c:1 >-
c:
.2 ! <a
.... ~ a.
"0 <a E
Qj u 0
81 0
¡¡ ..., ü
Permanent Datum :
Log Meas. From
Or1g. Meas. From:
Well
æ Field
N
(I)
a::
g Country
<t
z :2
.. 0
H
~
<
C1 U
ë: 5
--~---_.
USA
OTHER SERVICES
406 FNL, 205 FWL
SEC19 TllN R15E
y= 5,961,467.29 X= 691.951.34
API# 50-029-21872-01
._-~------,--_._~--'.-.._.
E1ev.: 0.00 ft
48.22 ft Ab.Perm.Oat.
E1ev. KB 48.22
DF 46.82
GL 17.30
WD 0.00
MEAN SEA LEVEL
RKB
RKB
Size
(in)
6.000
Borehole Record
From I To
: (ft TVO) I (ft TVO)
8536 -L 8673
I
I
Casing Record
Size
(in)
13.375 I
----+
9.625 '
7.000
Weight
(1b/ft)
72.0
47.7
29.0
From I To
(ft TVO) i (ft TVO)
..._.-"-.__~ 4 6~_
¡ 8255
8087 8536
End Inc.
(deg)
88.9
.-.,--.---,.--.-.,. .
_ ___________J--
------"
I
_____..._.......____._ I
.___.--L_____.__..
--- --.--.--.------+-
, ,
------+---.-------:------------
+t
I~(
AttE7
I DGWD SYSTEM I
I- ...¡ <i
Z s:i tþ¡, ~
,:) u. 0:'
lI'> ci
>-, 0 I ~I
d: N
CQ ~, (I) I
.... , <ti
u.I ..J ~ CQI ...¡
Q..'
0 Z <1:,
d: ::t. u., en <1:' 0
0 ~
,:) t.O .... : u:
(I) Ui 0::1
::), 0:: 0 u.I ~I
Q.. q, (I) <1:;
.. ..
c:: >,
t c::
~ ('J
C::' 0.,
:J "'0 ('J Qj E
..~ u
0 0 5:: 0
U ü: ...¡ . u;
Permanent Datum :
Log Meas. From
Drlg. Meas. Fr.om:
ROP RATE OF PENETRATION
NGP NATURAL GAlVIlVIA PROBE
HORIZONTAL PRESENTATIO~
_ C o~~l!,_an~~~~~_~ ~~~~~~#~~(- FHl-PD-----------
Rig : NABORS 2ES
--.-.---.-,.---------.-.--.~......, -..-.......--.,....-. ·'-AUG·'-3·· Ö··-19 q'~.~.'. ._.m.____.___.. .-. -.-.
_~~_~!.._.___~~!_~::!~_~ __!~!~.!_lJh1ska- {)¡I.&·~:¡._·_____.·_·· ~...' _ ~:.._-_........_- -., ..---. ...
A. /., VUII/i/HS"iu
Field PRUDHOE BAY uNl'fwrane ,) n
(I)
u.I
N
(I)
0::
~ Country
<I:
~ êš: 406 FNL, 205 FWL
~i SEC19 T11N R15E
crI ð ;-y='5, 961, 467. 29 x;-69i~·95i'.·j-4-----
æ 3! API# 50-029-21872-70
MEAN SEA LEVEL Elev.: 0.00 ft
.- ._-- -_.~-.,-._._-,-"_Þ_.
RKB 48.22 ft Ab.Perm.Dat.
RKB
-~ ._.__.'.þ--~-_.þ._._.,._----,_._,.._,--_.- - .~.._..------,~--_., -,-..'-'-"'. ..
U.S.A.
OTHER SERVICES
_._._-,._-------~-_._..
Elev. KB 48.22
OF 46.82
GL 17.30
WD 0.00
---'-'--'--
To
(ft MD)
11952
Casing Record
Size Weight From To
(in) (lb/ft) (ft MD) (ft MD)
1 ~.:. ~_s..._. ....___.__??-_'- 9 _____.____...._._. ._____._.__~i.6_6._. .
9.625 47.7 8699
. ._____.. ___ ......._._...___ _. __ . _... _..._.___ 4_ _". _ ..______ _...._ _~_______.___ _
7.000: 29.0 8598 9776
Borehole Record
Size
(in)
6.000
From
(ft MD)
9776
: End Inc.
(deg)
85.8
-- ._---_..~~--_._~. ~----.-._--_.__. -_... ._---
_... -'- ------" -- "-~~-"'---_.'-----' .-.......-----.--....---.-.---..-.....-.. .
-. .-----.-. -_.- ._..-_..__._---_.~....._-,._-_._- -----.-.--.-. - .-
. --- '---"----- -._- ----_.._--~_.__.._---_.'-,---- ._--_._~_._-
_____ ~_.__...________________ ____.____._._. OO·_..··_··_·n _._....... .___._, .__..__q".'_..'_ .._......_.__. _._..__._. __._...
______ ._.._______..._..-4._.._..,__..__.__.... ...._ _. .._.._."..__ ,_____··,,_._._u
--- --_.._--~- - .-- --. -.. --.---- ------- ._---
ß
l~\
('. ·_·~~~·~~~~·~~~l~~~~'~'·~~~~
. ~"'~';:""S' ··'r, ·~~~~,~.'i'" ,.,' >..... I .' ......., '. ,,'" ", " '.~" ,,' ,~. ';""" . :"~ ~': ·,.::~':".,~·'·I,'.;:~i·,;'t:r'·,"·:~:,~> ~".; \.,' ~
".';'..,',"'.... :. :,I:···.,::,¡",v~··:,:,:,.:·~,:,,;¡:, ..,,,;,:,,'~, :\.:\r··::;.lJr~:r,'I'.s.',:.'t'.(::-.,"': .".,~I.'( ,"'.:i .;/,. ",:,'.~,¡,:" '.,....~:¡) "~,")I\\I',·~"rE~,..~~tf:.;~~~.~:r:,.......
~~!;;~)~·~~1:~~ ~.~>. '.:; ~"
k,~~~.., \_ .. :1\ '" ,- '~.
~~~J:f(:>j :ri~.>.~ T-
i~··'·· " '1
' o/i~1~ ii.} [~.
I..,' ,~...' ·;H.t.' I -
.... . .. '.' .' . . ,.11 :ii::¡r
... ",. ,.to"''''' J¡~"~ ...... .J
....:../'%~';;: ]~~~':? :.'.{J
. . ".' ·!../rl...., ' '" . II
I .....~ I~t ',;~~~:: ',: ." I'· ... ..
,'. '..¡,~... ,. '., 11
· :.:-= ;~tS:'; :',' . ¡II :
. ., ·,'1,:,'.r., ! :
.:' ',,:, :~~~¡'~<, .:: ....~ '~
,:;'. ,"1\"'~1¡" ~"I
" '. -:);;:.'.~f~;.' ~ !I
, " .~.r.:,;, .""'1 L-'"
. ,-:. .<., '4,{:~ ;;~i. ,r-, I: .
. ,,' .!.f.:~...,~r~',' .C::C ¡
-----~_. "'!ì("";"'!'\;"~,: C '
. , o' i.ll' "~, ~
" ',' <:;.:' .~~r~Et:: ¡". Ii;
.----~."":"-'. '·~f.·'~.': '~'. . II:
. .'-,' ·':~r""·:~1C.¡;.., '~1,
~ g tN ~ \Vell : 18-18A ..., ,::,\. ,.'. ',' ,~~t··,~..,; .'..;.J ¡1'
~ Ci .., .----~-- \ ~ \r1'~K,-~,~~--~~.~7 r.~~~·t~j~ ,WJU
~ ~ Z .~ . In F.·cdd PRUDHOE BAy('\~r..J. .J~.". ,.'\.'::' .);~~¡,§;¿:~ ~ I! ¡
co ..... <:( ~ " _Xl) 11 r.. .' l"'j'~'" ~J,.t"1h. ¡...;
~ ~ CI) .. --7 ~W· -~--:-:-;,:~F;:;-'i" .iil~'h~~l¡ro-\ " ,h'J
~ <t 0 0:: . 1 ~'V ... 0, .11::': ," ~~t:',,' .' .' I' .
O'¡ ~ 0 Co llY US~ ·,\,Ü, V .I,,~\t'·, '. ':,',.".: 'jI.
:g G , fÈ ~ u n ~ 4 (h \~ ~ \\~ ~,;. _'.. .'~ ¡c ;',. .. .: "', ' ¡ ~
I:t ~ ~ <t ~ 51 406 FNL. 205 FWL . . ~jJ'.~t \ ~SERV'ICES':'''':~: ~f~d) ~,;, ".' .'."11 j
Þ-4 SEC19 T 11N RiSE ~Wl.\¡\~\ ';.-\' . -- .:.. .,"·i <~\.~~", :: .:-. ~ II j
I- I ;:)L:.\...J (\; . . . . """1 '.,' ' 4
<~ '. '. J¡,{IIII ._ ¡.
y= 5, 961. 467.29 X= 691,951.34 " ..," .: --:.':~' ~:~,~'>t::~·:"'. ..~: '.,:
API# 50-029-21872-01 ",,: ;;~~' :i~~;'i~',' ',:~ ',',' "I ¡
MEAN SEA LEVEL El ev.: O. 00 ft 1;1 e" ;:KBh'AI¡';:gŽ>': ~ ~~:~i .,f~Ój
:~~ 48 . 22 ft Ab. Perm; Dat .' ¡~~··1~':·.~~~ :\1i1Îrr:: ~:(.:~¡;
WD, O. 00,,' '.;,:' .;~ ~":; '2' ' " :";" ~
R~C;~::~~,~::,~~'~~~~ : ::::; ~~ (1
(ft MD) (ftMD),~, f;I!~~~:.:....~ < '. ~
... ftt";>"~, . '., I ~
, 3466'· . l:~.~:,;:·:,' '::..' I ~
I,' ·'·86'99'Y~' ì ~J"¡'~'" .,,"0' :.-1}
,: .,.';' ~:; ': . ";::';;~~ í1\.~~~I¡ ;~~~~}i~:~:jk
I '".' 97:'1(;,';-,::,,' ~ . ,,-".'" ...r" :,~
.... "";:G~';i~~if;.j~
'. -\ ~~"-4"uI c.~··~.'· ," 0
. , ' . ..'I~:',~ .;.;~1./,~:~' ,:~~ '.: ~..
ROP
NGP
RATE ,OF PENETRATION
NATURAL GAJ\.Il\'IA PHOBE
IIORIZO~TAL PRÊSENTATION
Compan)'
ARCO ALASKA, INC.
I~ig : NABORS 2ES
---------.
WJ
o
.,..
o:t ; is
en I :>
:> I ~
.. I o.
J
è,
~ 'I "C
Õ ;¡:;
vi u::
Permanent Datum
Log Meas. From
Drlg. Meas. From:
Borehole Record
Size From
<in) (ft MD)
_~,_OOO .~_ 9776
To f End Inc.'
(ft MD): (de)
13062 88.9
Size
<in)
:;:-. ....- ..--.--.----""1"-.-----
-+
I
13.375
9.625
7.000
I
..---- --_._-~~--t--.
-~-----------
;þt
I ~\
\'is -0\ 'f
";'"
(r':,~ I
"., "'(~.;""..':.
. ,'t1f¡;:;i,:}" ' ,
, :··t"·~·,·"··,::;,,
,,':1[:\;';"': ,".:
~,' ,. ' -',
HOP RATE OF PENETRATION
NGP NATURAL GAl\lMA PROBE
HOUIZONTAL PHI(SENTATIO~
[Jj(1"W""õSŸš-fË-M ::J
I
I
I
, 1-, ;E'
I "iõ'
5' ...
, r <:!,n.li>.1ny.: ,\lieO AL\~"'\' .!i\~:: ~ - ~}>:,.-!
, ." ',. :,
1 ,~, ~ . ,: ~.: "
~, æ i '~~::.-'~-':~::~;~l~'~l:~:~'{-~J-Tn'~ .' 'n - - _U.:n:~u:~ :~- ~1:'fL
i ~:~~~~~;.A.-n_--_u_..- --- ~:,7;;7"--'$'~----~-i~t¡!¡'~'
~ 51 406 FNL 205 FWL - jj!i"~F1_~~_ '11;i1i.ij '.
æ g r~~~:~~~~~;~~t~~i~95i~34-_n ,_ '0
I
MEAN SEA LEVEL Elev.: -º.:_.Q-º-___.,ft ; Elev. KB 48.22 :,
RKB 48.22 ft Ab. Perm. Oat ~ I OF 45. 82
.___4.___.__.._
RKB Gl 17.30
WO 0,00
Borehole Record Casing Record
Size ¡From: To End Inc. Size I Weight From: To·'
(in) : (ft MO) (ft MD) (deg) (in) ¡ (lb/ft) (ft MD): (it MD)
=6~~ 9775 ~ 11952 ! 85.8 ~ :!~~-f-1H ~--=~59~~-~ i\~J;.;.¡.,,;:,,:.'.}..,'...'.;.:,'.;.:,,~,:~.
-.---..!---t-------- I ______.-.___.__~..._____.__.,____.__u -.,
'I ! __'"________ .'" .
---.----:: ---:---·--+--1 -- =-- \i ---~: .-----~,,-----.~.'
~ - , -t~¡"
j -i¡:'~~'
..,¡
t2
>-, ¡g, J:: I ~
~ N Z' 'VI,
~ I' ..."c,
~ ...il ;: _ ~¡
:' ~!,., ~\I G ; 8j
~: ~ ~i ~ ~ ~!
'ci, >
~: ~I æ
~: ~ §I OW ~
~! ~ ~¡ ~ u1
Permanent Datum :
Log Meas. From :
Orlg. Meas. From:
.-1-1, ,'-,
~-t-f.
(;) (
Permanent Datum MEAN SEA LEVEL
Log Meas. From RKB
Drlg. Meas. From: RKB
MtE7
I DGWD SYSTEM I
I- -' <31
z ~ w ~.I
:::> u.. Ln
LO a: <1:1
>- 0 ~I
<I: N ~
CXI
w ..i ~ -'I
0 z <1:,
:x: u.. 0"1 <I: ~I
0 ~
<I: :::> t.O G
CI) a:: 0
:::> Q. o:;' W ~
CI) <:(,
.. )
>i I: >i
1:1
-\ ,g 101
C:, ""0 10 0.1
::¡; ÆI u ãi ðl
0' 0 ~
<..>: u..: -'
ROP RATE .OF PENETRATION
NGP NATUUAL GAMMA PROBE
HORIZONTAL PRESENTATION
C~mpa~~C~ A~K~~ {ftlLV-Eð--- ...____ ____
Rig : NABORS 2ES )~U{;~ ~..
-------------IIlãSk;o¡-:-0 O-19S,r;-- -....-
Well : 18-18A f & Gas (,'0" ,.
-·------"--·---·-AÎìCk-::---~'-I.!...('Ítrrm··-..-;· ..... ..,.. ."" -. ...~...-..._.._..-
1Jorage . JlIS.c;¡O/l
Field : PRUDHOE BAY UNIT
CI)
W
N
CI)
a::
g Country
<I:
z
.. ß I 406 FNL, 205 FWL
~ i SEC19 Tl1N R15E ___...__
~ ð! y= 5,961,467.29 X= 691,951.34
ä: 31 API# 50-029-21872-01
..~-----_._-----_._--~.-----_._-......._..'~_.._.__._.....--,
_. ..'0··..._---,,·,-·· .,__,.,_,.,., ..._ _..__"" _ .___
: USA
OTHER SERVICES
-_·-.0'··--'·------ ______·_.___0_..._____
Elev.: 0.00 ft
----
48.22 ft Ab.Perm.Dat.
Elev. KB 48.22
OF 46.82
GL 17.30
WO 0.00
------------
Borehole Record
Size From To II End Inc.
(in) (ft MD)! (ft MD) (deg)
6.000 9776; 13062·! 88.9
,-.... ". ...... .... ----------.--.--------t---
Size
(in)
13.375
9.625
7.000
Casing Record
Weight I From To
¡
(lb/ft) , (ft MD)' (ft MO)
72.0 3466
--....----...----. ~_...- - - -- ..,."'--. -----
47.7 8699
-_..._--.._~.,+- '-~'-------.,-
29.0 8598 9776
.------- - ----_. ..- -.. ..--.......-.-----. ~----- ~-._-
- "-" ..__. ....-----:...-. .__..~--_._~------+-------
- ..~_._. _.___'__ --0-----..---..--...---.
,.._._...._--~_._- .~.._.__._'-_._---------~--------
---1----_·_-- --_. -.-...-------....--.--
-------_--.:......__._----------+---~._._,..._--- -
, ,
_'-0.-_- _.____..__ .____
-+----
~ . .
. "
ì
1,
,t"'.t~':;,,~>:?
, ~.J\ ~ ,.' .·1
. .." n ¡- C t: i~ ~ aç.: R' ....~){,(,.:...¡:. ..:. ,. ,:..c '. ... ~"~. ;.":::",,:
',.~, '~,-.-~~.:~.~.~_.:-~~:-:.: ~7·~·~--~_··~··_~~··~!..:·~:~~~_·_··~:,~'~~~~~:L· ~:;_.J:7":"~'~'~1:-7~~~:·'·1i~··· ··~:·r:~
~,~.., ! t;:>J'Ei - "- ,3. ...C.. . .., L . . i.; £),J"~." . -.~. :. ~~l. "., :', :~.' ':.'1;.;'~!~'~,
,"""l"'-~' ¡ ¡ ....·'·1 jn"-j"'''''' c····· '-·I-·.......JI ¡ ~~" , ~~,..... "1' .. ..'" ~.;,!..¡.-,,-
...... ,..-'rJ.. ' ! ....~ . t~·· .. ~ I·, .1. ," .. .., )'. .. , , ' ..-
.t1~ t; z "'~". .,.,J_ ~---",. h-"" . t ......L,. ..-,.,..,.....':0......"... ..-
é ~ I~ ~:~:;=-:-=~---~---:-;.:-:-- - ~--~-:-7+:-7~~ : - ~ 48.8 ~ --j'~, ~
... h../~ P-e.m.mt:r.,...!.,,,M... __t.~",?_,L" ': .':. ..._.,..,_'" J..-:!~'V:,. _~~.. .......:...,..1...,.:... \',jiu
....iI,. 10) . , . . --- .. . ..
a.\ ~_.~ Log Mf.".as~':rf:'d ç ;':-JiT¡: H t\,B. . '. ';48.22;Ç~ 2:Jc1"'Ø: Pœrm., Q~1)JI1'I'" ;r:'+:~n¡5
~~J '1 ;~. '. ._. ~',' : ~l' " r:'::~: :~'_. ':'.". (~. ··~·,,;·~.·~::..:r.'::'...: ';. .. -~:"\~~!~t.~
& F' Dr...Img M!Q'.as·¡j.~. j ¡ ¡r.ç ,,- _J~:~~P:; --" -,. " :, - ....!,.~. ., ¡. .'. ,.' :--~_._----'''.
;~:'. ~~. .. '--:'-:-~-~~-~--"c--'-~-"~~--:r:--" ::::-~:::~''''''-r\~~~;: ., '.,~¡ ~ ~ :''7'~:.'~-'''-':-^- ...~:::::.;~~~~
:? f: , N"~ SI£~¡1:¡;¡¡ Nr~ I! . :. ·b!:.':('· \ h.~~.·. "!"~ TOWN<>h" , r ¡w"",-,:::_
::> d 3 : ~~Æ-21872-v'~ ,t.· ,'. ~~ ",., > 11N .".' '....;'.'~'5£ ~-
-.1-.....---.......- b.... ~....... .. J", 1 '-- ~II
¡ . ','I,;
! 4.5oiJ.(\ in .
-_..._~,.--.__.~ ··_~"···"·'1··'·· .............-......':....... ,.,...... ....,..
W,:;'¡"ht ." ,
·G~~~~·' .......__..~_..C"'.--'---:--_._..
."_' ~~_.__~~'._.._.., ...M ...~._.M..........~.__ .__
From
- ._~_._.~, ........". ........-...~,....._.p,--, .-..... ... .
~ "~aft: .'
,_.r" ..,.... " :~_.::;>". . -.~ . '.,:'.' t
M¿-1,J.:.Iiy'1um Recoroed ïemooQ¡::D.n.e5 ,', H~ di-gf : ~ ., '< .' l",:,¡;¡:x!~
~È~~~~~\~[~fE'_~2t1110~~:;;,__·13±$i~'-~::-:-_;;:;2~~;:;~;:_j"~'::$1
L.
I
I
r-
t-·
I '1l,i~:·
'·.....t... ...,If¡, .¡ ""'J ,'r~. '.~,·.···.t.·""..· .~.'~.;",':.',..'.'·r.. ,:..." ki£./.1i;. ..,..
ti :~~ f\l~ 't . i ·~~r·)t,,:i:; ~':, ,f:,t.~'t1t
:"F:., f:l"1 ~":"'-tr.; . '";. )l1.~ :.;" . ~ L,\! .4" 1(1.' .,'
\/, t"~"¡ W, ~-"'~:":}:Þ~:~lh~ R~;~ \fk
~.I"¡;;JIiJ~. ~,hkìil.::J~ ..¡,,:.~',;! ,'i:,&H
, '
~ 11· """ 'iI i¡~ . . ~""'ê'"
j\:t·.v~·r~.", ,~.~~,,~~"'~~'\
.'
r.1 ....
",_I ..
.. ~....
- '..
, .....
~, ?
t..',,-,
-.
~~'"- =-...,
..:: . .";'.r."l_ ~
,- ",7
. .:::ÞF.
'\~l
-o/~v
. - >.
..c c:: c::
OJ ° n:s
6 -0 ~ - E
(0) OQ3 °
m u:: .3 ~ 0
L°.99i!':1g.Q~~_..__ _
Run Number
- -- ---_._---------------~ -
.'pepth_Q!:\I~~_ __
Schl~_~~_rg.er Depth__
Bott0.rn Log Interval
Top Log tnterval
Casing_ ~luic~TY~_
Salinity _
Density
Fluid Level
BIT/Ç,l\~IN~{TUBING STI3ING
Bit Size
From
To
CasingfTubing Size
Weight
Grade
From
To
Maximum Recorded Temperatures
Loçger On Bottom Time
.Jnr Numbe" Location
H;e:.orded 8v
,-
--
<:
-' « ,
~ z I
0
:u >-- lo ¡::
lL « 0 ~
') m (\j «
J w oö ex:> 0 Z
'f) 0 -' -' 0
L I Z cD 0... ¡::
t- O u.. X «
~( ::J (0 W 0
0 rr: (f) 0... 0
Z 0... ~ 0 m -'
/'../j" ·11.~~;St·:J [~.\.
:~¡I;,t~h I! ~.II [Ir~ ~]II[:~ Iril'!JI1ffi! fi
;::¡, :-:;; :::: ¡::::J F: C F ¡ L. i::. I P ~ 0: F } L ::~ :
SPINS . TEr~~p ... PRES;' GR,.
1-DECEMBER-2000
406' FNL & 205' F\,IVL
SURFACE LOCATION
Elev.:
Permanent Datum:
Elevi:
.¡
48.22 '~
K.B. : 48.22ft
G.L. 17.3 ft
D.F. 46.8 ft
_Qj't.__...._______ _
above Perm. Datum
'.
M.S.L·_____.__.m._.__ u.
.. R. K B. __no ._ ______._
R,KB.____--~
SECTION
19
Log Measured From:
Drilling Measured From:
API Serial No.
50-029-21872-01
1-DEG-2000
ONE
TOWNSHIP
11N
RANGE
15E
- -. ------ ~----
-- --------~----~--~--
. - -------
- -------
___.__d_____ __ _
---~-~- -
--- ------
--- ---_.---
12990 ft
12988 ft
11400 ft
PRODUCED FLUIDS f CRUDE
í
- --FINA['T-~
-- ------~-
- ---~-~ ~- -
-------~~-----
----- - --- -----
Oft
6.000 in
9726 ft
13058 ft
4.500 in
12.6lbmjft
L-80
Oft
13058 ft
¡ 172 degF
I 1-DEC-2[IQO
- -- ----- - -----------
-- -- ---------~--~---~-
14:00
, eTE _(I ~ P~0 Jt-iO¡:: SA \
ef~.S()E-jlviE
::: "'-¡' i 1./ ,",!'
Lo in Date
Run Number
De th Driller
Schlumberger Depth
Bottom Log Interval
To Log Interval
Casing ~Iuid Type
Salin'
Dens'
Fluid Level
BIT/CASINGffUBING STRING
Bit Size
From
------ -- ------ --------------..
To
Casin ffubing Size
Weight
Grade
From
------------------_..---
To
Maximum Recorded Tem eratures
. .-. boqger On Bottom __ Time
~ I ~~""ber \ Location
Recorded BL - --
Witnessed B
~
en
:5
---I ~
~ z
0
w ~ Ù1 ~
a... 0
0 rn C\I <{
---I W 0I1S CD 0 Z
en 0 ---I T"" ---I 0
I I Z cO a... ~
~ 0 LL ~
:J (0 cn 0
,0 IT: a... 0
?; a... ~ 0 rn ---I
I I
(I) >-
c: c:
:J 0 as
0 t;1 a..
cr: "U E
0 Q) 8 ~ 8
rn ü: ---I
Schlumb8Pgep
RESERVOIR SATURATION
SIGMA BORAX LOG
2-DECEMBER-2000
406' FNL & 2051 FWL
SURFACE LOCATION
Elev.: KB. 48.22ft
G.L 17.3 ft
D.F. 46.8 ft
Elev.: 0 fl:
48.22 ft above Perm. Datum
Permanent Datum:
Log Measured From:
Drilling Measured From:
M.S.L.
R.KB.
R.KS.
API Serial No.
50-029-21872-01
2-DEC-2000
ONE
SECTION
19
TOWNSHIP
11N
RANGE
15E
12990 ft
12968 ft
8950ft
SEA WATER I CRUDE I BORAX
Oft
6.000 in
9726 ft
-- -- -- -- --- -.--------
13058 ft
4.500 in
12.6 Ibm/ft
L-80
Oft
13058 ft
172 degF
2-DEC-2000
1 PRUDHOE SAY
B.H.BOEHME
C.SHUMWAY
14:30