Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-002XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. / ~'""' (~~ File Number of Well History File PAGES TO DELETE RESCAN Complete [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by~Dianna TO RE-SCAN Vincent Nathan Lowell Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Isl 1 a. Well Status: DOil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class: Anchorage 20AAC25.105 20AAC 25.110 181 Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions Zero Other - D Stratigraphic D Service ~ ~ 2. Operator Name: 5. Date Comp., sUSP"1~1 12. Permit to Drill Number BP Exploration (Alaska) Inc. 3/18/2007 195-002 306-309 3. Address: 6. Date Spudded " -,r 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 01/09/1995 50-029-22542-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 01/31/1995 PBU A-42 2263' FSL, 1703' FEL, SEC. 35, T11N, R13E, UM 8. KB Elevation (ft): 15. Field / Pool(s): Top of Productive Horizon: 686' FNL, 1736' FEL, SEC. 11, T10N, R13E, UM 85.5' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+ TVD) Pool 1214' FNL, 1638' FEL, SEC. 11, T10N, R13E, UM 13927 + 9058 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 653705 y- 5947415 Zone- ASP4 13960 + 9062 Ft ADL 047472 TPI: x- 653848 y- 5939188 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 653957 y- 5938662 Zone- ASP4 N/A MD DYes 181 No 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey N/A MSL 1900' (Approx.) 21. Logs Run: GR 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE ' .. AMOUNT SIZE Wr. PER FT. GRADE Top BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 110' Surface 110' 30" 260 sx Arctic Set (ADDrox.) 10-3/4" 45.5# NT -80 35' 3124' 35' 3114' 13-1/2" 970 sx Coldset III 375 sx Class 'G' 7-5/8" 29.7# L-80 32' 13195' 32' 8946' 9-7/8" 265 sx Cla!':s 'G' 4-1/2" 12.6# L-80 13080' 13960' 8887' 9062' 6-3/4" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. TUSING RECORD . ., ..,'.. Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 12983' 12937' MD TVD MD TVD 25. ACID, FRACTURE, CEMENT SQUEEZE; Erc. ... DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED SCANNED APR 262007 13208' Set Whipstock 13208' P&A w/21 Bbls Class 'G' 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date ofT est Hours Tested PRODUCTION FOR OIL -BSL GAs-McF WATER-BsL CHOKE SIZE GAS-OIL RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED OIL -BSL GAs-McF WATER-BsL OIL GRAVITY-API (CORR) Press. 24-HoUR RATE'" 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sh~.!1~c:~~~ary). Submit core chips; if none, state "none". D''''"' T ~ None s-/?-'b? J ~~~~~ Form 10-407 Revised 12/2003 ONTINUED ON REVERSE SIDE A~f~. '" . STATE OF ALASKA . ALASKA OIL AND GAS CONSERVATION COM SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Alaska Oil & Gas Cons. Commission RECEIVED APR 1 3 2007 ORIG\NAt RBDMS 8Ft APR 2 5 2001 '\ 6 · 28. GEOLOGIC MARKE 29. ORMATION TESTS NAME MD TVD Include and brie mmarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 13140' 8918' None Shublik 13167' 8932' Sadlerochit 13418' 9012' 30. List of Attachments: Summary of Pre-Rig Summary and Daily Drilling Reports, Well Schematic Diagram 31. I ~erebY certify that the~oin~ is true and correct to the best of my knowledge. Signed Terrie Hubble Title Technical Assistant Date (j-{/1 2/0 PBU A-42 Well Number 195-002 306-309 Permit No. / A roval No. Prepared By Name/Number: Drilling Engineer: Terrie Hubble, 564-4628 Garret Staudinger, 564-4242 INSTRUCTIONS GENERAL: This fomn is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IrEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IrEM 4b: TPI (Top of Producing Interval). IrEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this fomn and in any attachments. IrEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IrEM 20: True vertical thickness. IrEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IrEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate fomn for each additional interval to be separately produced, showing the data pertinent to such interval). IrEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IrEM 27: If no cores taken, indicate "None". IrEM 29: List all test infomnation. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only . Well Events for SurfaceWell - A-42 Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> GC3 -> A -> A-42 Date Range: 18/May/2006 to 15/Mar/2007 Data Source(s): AWGRS Dig!tal Wellfile Events Source Well AWGR,S A-42 Date 03/15/2007 AWGRS A-42 03/09/2007 AWGRS A-42 03/08/2007 AWGRS A-42 03/06/2007 AWGR5 A-42 03/03/2007 AWGRS A-42 01/27/2007 AWGRs A-42 01/09/2007 AWGRS A-42A 01/08/2007 AWGRS A-42 01/04/2007 AWGRS A-42 12/18/2006 AWGRS A-42 12/17/2006 P.WGRS A-42 12/16/2006 . Page 1 of 2 Description T/I/O= BPV/0/120. Temp= S1. Bleed WHP's to 0 psi (pre-CTDsidetrack) ETA 3/15. Bled OAP from 120 psi to 4 psi in 5.5 hrs. Monitored for 30 mins, OAP increased 2 psi. Final WHP's= BPV/0+/6. T/I/O=BPV/75/150 Temp=SI Bleed WHPs to psi (pre CTD sidetrack). lAP increased 60 psi and the OAP increased 10 psi overnight. IA FL @ 380'. Bled lAP to bleed trailer from 75 psi to 0+ psi in 15 min. Bled OAP from 150 psi to 8 psi in 5 hours (16 bbls returned). Shut in and monitor OAP for 15 min @ 8 psi. OAP increased to 40 psi. lAP remained @ 0+. Job was shut down by FO due to freeze protect crew showing up. Final WHPs=BPV/0+/40 T/I/O = SSV/340/190. Temp = S1. Bleed WHPs to 0 psi (pre CTD sidetrack, ETA 3/15). IA FL @ 378'. Bled lAP to bleed trailer from 340 psi to 0+ psi in 2 hrs, 30 min (all gas). Sl, monitored for 30 min. lAP increased to 5 psi. OA FL @ surface. Bled OAP to bleed trailer from 190 psi to 90 psi in 1 hr, 45 min (7.5 bbls fluid). During bleed, lAP increased to 15 psi. Sl, monitored for 30 min. OAP increased to 140 psi. Job shut down. Bleed trailer @ 50% cap. No trailers available. Will pass down to night shift. Final WHPs = vac/15/140. SET BPV PRE RIG WORK API VALVE SHOP T/I/O = Vac/350/140. S1. AL Sl (600 psi), flowline frozen. Bleed WHPs to 0 psi (pre CTD sidetrack). IA FL @ 378', OA FL @ Surface. T/I/O=VAC/400/200. PPPOT-T (PASS), PPPOT-IC (PASS). (pre-CTD). FMC BP New Standard Slim hole. Casing head: 103/4" x 13 5/8" 5m w/ (1) 2" FMC model 120 OA valve. Tubing head: 13 5/8" 5m x 13 5/8" 5m w/ (2) 2" FMC model 120 IA/AL valves. Tubing head adapter: 13 5/8" 5m x 41/16" Sm. Tree: Cameron 4 1/16" FLS w/ Baker actuator. PPPOT-T: Stung into TBG hanger test void to check pressure (400 psi). Bled test void to 0 psi. Pumped through void untill clean returns were achieved. Pressured void to 5000 psi for 30 min test, lost 50 psi in first 15 min, lost 0 psi in second 15 min. All LDS functioned properly. PPPOT-IC: Stung into IC hanger test void to check pressure (0 psi). Bled test void to 0 psi. Pumped through void untill clean returns were achieved. Pressured test void to 3000 psi for 30 min test, lost 100 psi in first 15 min, lost 20 psi in second 15 min. All LDS functioned properly. T/I/O = Vac/80/170. Temp = S/1. ALP = 1800 psi, S/l at casing valve. WHPs (post bleed, pre- PPPOT). From yesterday: TBGP and OAP unchanged, lAP increased 80 psi. T/I/O=VAC/490/220 Temp=SI A/L is shut in @ lateral & IA casing valve (1700 psi). Bleed WHPs to 0 psi (Pre PPPOT). IA FL @ 320' and OA FL @ surface. Bled lAP to bleed trailer from 490 psi to 0 psi in 60 minutes (all gas). Bled OAP from 220 psi to 120 psi in 5 minutes. Continued to bleed OAP @ 120 psi for 45 minutes (3 bbls returned). Shut in and monitor for 30 minutes. OAP increased 65 psi to 185 psi. Bled OAP again from 185 psi to 90 psi in 30 minutes (7 bbls returned). Shut in OA bleed and monitor for 30 minutes. OAP increased 75 psi to 165 psi. Final WHPs=VAC/0+/165 T/I/O= 0/470/220. Temp= S1. AL= S1. WHP's & FL's. TBG FL near surface?, IA FL @ 318', OA FL @ Surface. CTU #9 w/1.75" CT. *** Continued from 12/17/06 WSR *** Continue to POOH with 2.70" dummy whipstock drift. Freeze protect well with 38 bbl's of 60/40 methwater. Notify pad operator of well status and to leave well SHUT-IN. RD CTU #9. **** JOB COMPLETE **** CTU #9 w/1.75" CT. *** Continued from 12/16/06 WSR *** Continue to RIH with 3.70" OD dummy whipstock, tag at 13241', pickup and tagged again at 13235'. Pick up and attempt twice more while pumping down coil and tag at same spot. Set 8K down, still would not drift thru. POOH. Break off dummy whipstock drift and 3.63" OD round nose nozzel. MU 2 7/8" motor, 3.80" OD String Reamer and Diamond parabollic Mill and RIH to 13208', tag liner top, rolled pump and got thru, saw motor work between 13223' and 13236', work this area up/down then drift to 13350' and POOH. Remove 3.80" string reamer and mill. MU 3.625" OD dummy whipstock for drift and RIH. After several attempts,unable to drift pass 13235' ctmd with a 3.62" OD Dummy Whipstock Drift. POOH. MU new 2 1/8" BOT MHA w/ 2.70" OD X 15' long dummy whipstock drift and RIH. Drifted with 2.70" OD dummy whipstock to 13350' CTMD with no problems. POOH. **** Continued on 12/18/06 WSR **** CTU #9 w/1.75" CT. *** Continued from 12/15/06 WSR *** Continue chasing out at 80%. Breakoff BHA from FCO, MU BOT left hand MHA w/ 3.80" OD diamond parabolic mill and RIH to 12,970' CTMD and mill out XN nipple, make dry up/dn passes without problem. RIH and tag possible fill at 13204' CTMD. Work area but getting stuck. Work free, POOH & MU Baker MHA w/3.75" junk mill to remove fill from liner. Work mill down to 13370' CTMD, pump final flo pro sweep and chase out at 80%. Tag at surface, remove 3.75" OD 3 blade junk mill, Extreme http://digitalwellfile.bpweb.bp.com/W ellEvents/Home/Default. aspx 4/11/2007 Dig.ital Wellfile A'NGRS A-42 12/15/2006 AWGRS A-42 11/19/2006 AWGRS A-42 11/18/2006 AWGRS A-42 11/13/2006 AWGRS A-42 AWGRS A-42 10/22/2006 10/22/2006 A'NGRS A-42 10/21/2006 AWGRS A-42 10/20/2006 A'NGRS A-42 10/16/2006 AWGRS A-42 10/16/2006 AWGRS A-42 09/18/2006 A'NGRS A-42 09/17/2006 AWGRS A-42 05/18/2006 . Page 2 of2 Mud Motor. Add 3.70" OD dummy whipstock drift wit.3" OD round nose nozel to same MHA and RIH. **** Continued on 12/17/06 WSR **** CTU #9 w/1.75" CT. MIRU MU BOT MHA w/2.3" OD JSN and RIH.Tag top of fill or junk @ 13218' ctmd. Clean out from 13218' to 13400' making frequent flo pro sweeps and POOH at 50% to above XN nipple before RBIH for more fill. POOH to change MHA. **** Continued on 12/16/06 WSR **** ***CONTINUED FROM 11/18/06***(pre ctd) llGALLONS OF FORMATION SAND RECOVERED TAG SAND TOP @ 13234' MD W/ 10' X 3" P-BAILER. ***WELL 5/1 ON DEPARTURE PAD-OP NOTIFIED*** ***WELL 5/1 ON ARRIVAL ***(pre ctd) DRIFT TO 13,169' SLM, W/ 3" x 10' DD BAILER, HANDFULL OF ROCKS IN BAILER CONT BAILING W/SAME TO 13,232'SLM. 5 GALS FORMATION SAND RECOVERED. DRIFTED TO 13215' SLM W/ 4.5 BLB, 3.625 GR ***CONTINUED ON 11/19/06*** T/I/0=860/900/200 Temp=SI MIT IA 2500 psi ***PASSED*** (CTD Screening) - Bleed lAP to production from 900 psi to 350 psi in 1 hr 45 mins (all gas). loaded & pressured up 1A to 2500 psi w/10l.4 bbls 90*F crude. 1st 15 min 1A lost 40 psi. 2nd 15 min IA lost 40 psi, bleed lAP, all fluid (11 bbls). MIT OA 2000 psi ***FAIlED*** lLR OA 5 bpm @ 1250 psi for 20 bbls. Pumped down OA with a total of 32 bbls crude. OA never pressured up. Bleed OAP. Final WHP's=880/40/200 ***Job Complete*** Job Postponed. Fluids not delivered to loc. ***CONT FROM 10/21/06 WSR***(CTD SCREENING) SET 1" DGLV IN STA'S #3 @ 6326" SLM, #2 @ 2984' SLM. PULLED WHIDDON @ 12921' SLM. DRIFT W/20' x 3.70 DUMMY WHIPSTOCK TO 13050' SLM. SET WHIDDON @ 12921' SLM. SET DGLV IN STA #1 @ 12768' SLM. PULLED WHIDDON CATCHER SUB. ***HAND WELL OVER TO DSO - WELL LEFT SHUT IN*** ***CONT FROM 10/20/06 WSR*** CALIPER TUBING & CASING FROM 13082' SLM. SET 4.5" WHIDDON CATCHER @ 12921'SLM. PULLED LGLV FROM STA'S # 4, 3, 2, 1. SET 1" DGLV IN STA #4 @ 2984' SLM. ***CONT ON 10/22/06 WSR*** *** WELL SHUT IN PRIOR TO ARRIVAL *** DRIFT W/3.5 CENT, TEL, SAMPLE BAILER TO 13090' SLM. SAMPLE BAILER EMPTY. ***CONT ON 10/21/06 WSR*** FCO/Mill XN/ Caliper - CTU #9 - MIRU. Attempt to kill well down backside. Well pressured up to 3500 psi. lAP increased as tubing pressure increased. Bled WHP down, lAP bled down with tubing. Shoot IA FL - 7380'. RIH with 1.75" DJN and tag at 13041' ctmd (TOL @ 13080') No evidence of any fill in area of S/L tag at 10,915' SLM. Attempt to kill well again. Initial T/I/O - 1078/1500/0. After pumping 125 bbls T/I/O = 1900/2500/300. (Could not get straight line injectivity rate.) Monitor 1 hr. T/I/O = 600/1600/300. Decision made to RDMO due to possible ann com issues that may need further diagnostics. POOH. FP well with 60/40 meth. RDMO. Notify Pad Op of well status. ***Job Incomplete*** T/I/O=840/1240/200. Temp=S1. A/L 51. TBG & IA FL. (Coil). TBG FL @ 170', IA FL @ 7380'. Coil on well. ***CONT FROM 9/17/06 WSR*** BAILED ROCKS @ 10915' - 10923' SLM. RAN 3" STAR BIT BETWEEN BAILER RUNS TO LOOSEN FILL. *** TURN WELL OVER TO DSO - LEFT WELL SHUT IN *** ***SHUT IN UPON ARRIVAL ***(pre ctd) BAILED ROCKS @ 10875' SLM. RAN 3" STAR BIT TO 10915' SLM. RBIH WITH 3.5" PUMP BAILER. ***CONT ON 9/18/06 WSR*** ***WELL 5/1 ON ARRIVAL *** (caliper tbg & liner) MADE 2 BAILER RUNS W/ 3" PUMP BAILER TO GET THRU OBSTRUCTION @ 10,910' SLM. RECOVERED 3/4 GAL OF ROCKS?? POSSIBLY SAND STONE?? DID NOT FINISH JOB. ***GIVE WELL BACK TO DSO. LEFT 51*** http://digitalwellfile.bpweb.bp.com/W ellEvents/Home/Default.aspx 4/11/2007 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-42 A-42 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/15/2007 Rig Release: 3/25/2007 Rig Number: N1 Spud Date: 3/15/2007 End: 3/25/2007 3/15/2007 06:00 - 09:00 3.00 RIGD P PRE Rig released from G-08A @ 06:00Hrs on 3/15/2007. Prep to move rig off well. Warm moving system. 09:00 - 09:30 0.50 MOB P PRE Held PJSM for moving rig off well & pre-move safety meeting with crew, security & tool services. 09:30 - 10:00 0.50 MOB P PRE Jack-up rig & pull rig off well. 10:00 - 15:00 5.00 MOB P PRE Move rig from G-pad to A-pad. Meanwhile SLB service injector & Nordic service test pump manifold. 15:00 - 16:00 1.00 MOB N WAIT PRE Arrive @ A-pad. Standby for SLB Slickline unit to RID from nearby well & for Veco to finish bleeding down the OAP on A-42. 16:00 - 16:45 0.75 MOB P PRE Move & position rig in front of A-42. 16:45 - 17:00 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for backing rig over well. 17:00 - 17:30 0.50 MOB P PRE Back rig over well & set down. Observe pad not level underneath the motor room. 17:30 - 21:00 3.50 RIGU N WAIT PRE W.O. Tool Services to deliver wood to place underneath the motor room. Jack up rig and position wood below rig to support it. Lower and level rig. Spot clean cuttings tank. VECO cleaned cement out of tank in their shop during rig move. RlU work platform on well tree. 21 :00 - 00:00 3.00 BOPSU P PRE ACCEPT RIG AT 2100 HRS, 03/15/2007. N/U BOPE. Pump open SSV and lock open with fusible cap. Position trailers and welding shack. 3/16/2007 00:00 - 06:30 6.50 BOPSU P PRE Pressure test BOPE. Witness waived by Jeff Jones of AOGCC. Send test report to AOGCC. 06:30 - 08:30 2.00 RIGU P PRE Prep to B/D CT reel with N2. P/U injector & stab on well. RlU SLB N2 unit. RID jucnction box & hardline inside reel. Meanwhile move Nordic-1 camp from G-pad to A-pad. 08:30 - 11: 15 2.75 RIGU N WAIT PRE W.O. DSM to RlU tiger tank. Could not RlU tiger tank earlier due to slickline unit on nearby well. DSM RlU tiger tank & hardline. PIT est hardline to 500psi low, 4000psi high - OK. Meanwhile SLB inspect all their lifting slings on the rig. 11: 15 - 11 :30 0.25 RIGU P PRE PJSM for B/D CT with N2. 11 :30 - 11 :45 0.25 RIGU P PRE PIT N2 lines - OK. 11 :45 - 13:15 1.50 RIGU P PRE Blow down CT with N2 & bleed down. 13:15 - 13:30 0.25 RIGU P PRE PJSM for stripping off & pulling back CT to the reel. 13:30 - 16:00 2.50 RIGU P PRE P/U injector & cut off CTC. Prep end of CT for internal grapple. Slip grapple connector into CT, MIU & pull test. Strip-off CT from injector & spool back CT stub to reel. Secure CT with crossbar and chains & prep reel for shipment. Release reel drive bushings. P/U CT reel with bridge crane. 16:00 - 16:15 0.25 RIGU P PRE PJSM with Veco crew on CT reel swap. 16:15 - 18:00 1.75 RIGU P PRE Open up born bay doors & lower CT reel onto Veco trailer. P/U replacement eline CT reel into reel house with bridge crane & align drive pins & bushing. 18:00 - 19:30 1.50 RIGU P PRE M/U hardline inside new reel. The stub of coil inside the reel was not pointed towards the center enough, so there was not enough clearance for the hardline and valves and pressure bulkhead. Printed: 3/2612007 10:31:30 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-42 A-42 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/15/2007 Rig Release: 3/25/2007 Rig Number: N1 Spud Date: 3/15/2007 End: 3/25/2007 3/16/2007 19:30 - 20:20 0.83 RIGU N RREP PRE Lost power, restart generator, failed again. Restart 4 times. Running OK. 20:20 - 00:00 3.67 RIGU P PRE Install E-Line pressure bulkhead, strip armor off of E-line. Bend end of coil to M/U hardline. 3/17/2007 00:00 - 02:30 2.50 RIGU P PRE Bend coil to make room for hardline, valves and pressure bulkhead inside reel. Install hardline and secure it inside reel. 02:30 - 04:30 2.00 RIGU P PRE Unstrap new coil, install internal grapple and pull test. Pull stub of E-Coil to injecter head. Stab coil into injecter head. Remove grapple. 04:30 - 06:00 1.50 WHIP P WEXIT Cut off 10' of coil. M/U SWS CTC. Pull test CTC - OK. MIU BHI Quick connect. Meg E-line - OK. 06:00 - 08:15 2.25 WHIP P WEXIT Flush CT with 5bbls of MeOH ahead & 10bbls of KCL water. PIT hardline to reel & inner reel valve to 350psi low & 3500psi high. Circ & fill CT with 2% KCL water. PlTest CTC to 3500psi -OK. 08:15 - 08:30 0.25 WHIP P WEXIT Held PJSM with DSM & crew for retrieving the BPV. 08:30 - 09:00 0.50 WHIP P WEXIT Offload WS tools & equipment, DSM lubricator & P/U to rig floor. M/U DSM lubricator to well. 09:00 - 10:00 1.00 WHIP P WEXIT Retrieve BPV from tbg hanger. Check WHP - Opsi. 10:00 - 10:30 0.50 WHIP P WEXIT RID & UO DSM lubricator & tools. 10:30 - 11 :00 0.50 WHIP P WEXIT Hold pre-operations safety meeting. Review well plan, potential hazards & whipstock setting BHA MIU procedures. 11 :00 - 11 :30 0.50 WHIP P WEXIT Circ & fill hole with 30bbls of 2% KCL fluid. 11 :30 - 12:30 1.00 WHIP P WEXIT M/U WS setting BHA #1 with BKR 4-1/2" monobore whipstock, setting adapter, #10J hyd setting tool, BHI Coiltrack BHA. Scribe WS tray to MWD. BHA OAL = 77.35'. MIU BHI depth encoder to injector. 12:30 - 15:30 3.00 WHIP P WEXIT RIH WS setting BHA #1 circ @ min rate thru BH1100% open EDC. Getting 23% dynamic losses. Wt check @ 13150' =:> Up - 43.3k, Down - 17k. 15:30 - 16:30 1.00 WHIP P WEXIT Log down GR from 13150' to 13275' (across the Shublik-Ivishak contact) @ 150fph & tie-into Geology PDC log. Subtract 0.5' from BHI depth & 18' from SLB depth. PUH to 13150'. 16:30 - 16:45 0.25 WHIP P WEXIT Log down CCL from 13150' to 13275' @ 900fph. Pick 4-1/2" 1m collars @ +/-13105', 13145', 13185 & some noise @ 13205' (probably a cementralizer?). 16:45 - 17:15 0.50 WHIP P WEXIT PUH to 13180'. RBIH & position BOWS @ 13220.44' with TOWS @ 13208'. OrientTF to 180degs - LS. Close EDC. Circ @ 0.3bpm for 2mins to set the whipstock. Pressure up & shear off WS @ 3200psi. SID pumps & set down 5k & WS held. 17:15 - 18:45 1.50 WHIP P WEXIT PUH to 13110'. Open EDC. Pump down 45bbls of 150k LSRV flopro pill @ 2.25/1.78bpm & 1750psi. Shut in well & squeeze in 20bbls @ 0.99bpm/1300psi & 675pis WHP. Lay-in 25bbls of hi-vis flopro pill 1 :1. 18:45 - 21 :45 3.00 WHIP P WEXIT POOH with WS setting BHA #1. 21 :45 - 22:45 1.00 WHIP P WEXIT Layout BOT Whipstock running tools. Layout BHI tools. 22:45 - 23:00 0.25 ZONISO P WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for MIU cementing BHA. 23:00 - 00:00 1.00 ZONISO P WEXIT M/U cementing BHA #2 with cementing nozzle, 18 jts of CSH workstring, BOT pull disconnect, XO and CTC. OAL = 561.17'. E-Line was hanging free, 5' into top of CSH top Printed: 3/2612007 10:31 :30 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-42 A-42 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/15/2007 Rig Release: 3/25/2007 Rig Number: N1 Spud Date: 3/15/2007 End: 3/25/2007 3/17/2007 3/18/2007 23:00 - 00:00 00:00 - 03:00 1.00 ZONISO P 3.00 ZONISO P WEXIT WEXIT 03:00 - 03:45 0.75 ZONISO P WEXIT 03:45 - 04:00 0.25 ZONISO P WEXIT 04:00 - 06:20 2.33 ZONISO P WEXIT 06:20 - 07:15 0.92 ZONISO P WEXIT 07:15 - 09:30 2.25 ZONISO P WEXIT joint. RIH with cementing BHA #2. Cire at 0.5 bpm, 100 psi. Full returns. Rig up SWS cementers. Tag whipstock at 13,233'. Correct depth to 13,210' at pinch point on Whipstock. Close choke, Perform injectivity test, 1 bpm at 530 psi, 1.5 bpm at 1050 psi. Circ. while SWS cementers batch mix cement. SAFETY MEETING. Review procedure, hazards and mitigation for pumping Cement Sqz job. Press test cement line. Stage 5 bbls water ahead. Stage 21 bbls 15.8 PPG, G Cement, 1.8 bpm, 900 psi. 0.3 bpm losses. Stage 5 bbls water behind. Isolate cementers. Clean lines. Displace cement with 2# Biozan. Coil capacity = 69 bbls. plus 0.9 bbls CSH capacity. 10 bbl behind emt, 2.2 bpm, 1100 psi. 20 bbl behind emt, 2.8 bpm, 2150 psi, 2.4 bpm returns. 30 bbl behind cmt, 2.8 bpm, 2500 psi, 2.4 bpm returns. Swap to KCI water at 30 bbl Biozan. 40 bbl behind cmt, 2.6 bpm, 2500 psi, 2.3 bpm returns. Close choke at 45 bbl displ, CMT at nozzle at 48 bbl displ. 1.1 bpm, 430 psi SIWHP. Sqz CMT to slotted liner at 1.1 bpm. 50 bbl behind cmt, 1.1 bpm, 450 psi whp, Pick up slow at 5 fpm. 54 bbl behind cmt, 1.0 bpm, 1200 psi whp, 56 bbl behind cmt, 1.0 bpm, 1500 psi whp, open choke and lay in cmt at 1 bpm / 29 fpm. Hold 1300 psi with choke. 6 bbls sqzd to formation. 60 bbl behind cmt, 1.0 bpm, 1330 psi, nozzle at 13080', inside 7-5/8" csg, lay in at 1.0 bpm/22 fpm 65 bbl behind cmt, 1.0 bpm, 1480 psi, nozzle at 12960', inside 4-1/2" tbg, lay in at 1 bpm, 66 fpm. 70 bbl behind cmt. Top of cement at 12,300 psi. Close choke. Pull to safety at 12280'. Sqz cement to slotted liner at 0.5 bpm at 1200 psi. Sqz 7 bbls. Stop pump, monitor whp. SIWHP dropped to 320 psi. Wait 15 min. Pump 0.5 bbl. Wait 15 min. SIWHP = 280 psi. Wait 15 min. Pump 0.5 bbl, Hold 280 psi WHP. Weak squeeze. Open choke. Circ at 1 bpm. full returns. Cire. 2 bpm, full returns. RIH and dress off cement to 13,150'. POH. RIH again to 13,150'. No indication of cement when dressing off. Jet OOH @ 2.6 bpm getting back full returns. Jet thoroughly Printed: 3/2612007 10:31:30 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-42 A-42 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/15/2007 Rig Release: 3/25/2007 Rig Number: N1 Spud Date: 3/15/2007 End: 3/25/2007 3/1812007 07:15 - 09:30 2.25 ZONISO P WEXIT across jewelries & GLMs. Dump cmt contaminated KCL fluid. Decide to pump eline slack management with CSH in hole as cement is already @ 500psi compressive strength. 09:30 - 09:45 0.25 ZONISO P WEXIT Held PJSM for pumping eline slack management with CSH in hole. 09:45 - 10:15 0.50 ZONISO P WEXIT Line up & reverse circ 55bbls of 2% KCL @ 4.0bpm/1700psi WHP, stopping & restarting pumps after every 10bbls pumped. Did not hear any audible sound of cable movement. Observe no losses while reverse circulating thru CSH. SID pump & break injector. Pull out +/-385' of e-line from CSH. Cut off excess e-line & boot end of e-line. SIB injector. 10:15 -11:00 0.75 ZONISO P WEXIT PJSM. UD Baker pull disconnect, RIB 9 stands of H/4" CSH & UD cementing nozzle. 11 :00 - 12:00 1.00 STWHIP P WEXIT Stab injector on well. Shut-in swab valve. Reverse circ 2% KCL @ 5.1 bpm/3200psi. Audible sound of cable movement stopped after 25bbls pumped. Stopped pump, restart pumps & reverse circ an additional10bbls of fluid @ 5.0bpm/3400psi till e-line stopped moving again. Stopped pump, restart pumps & reverse circ an additional 8bbls of fluid @ 5.4bpm/3620psi till e-line stopped moving again. Stopped pump, restart pumps & reverse circ an additional 4bbls of fluid @ 5.4bpm/3750psi till e-line stopped moving again. Stopped pump, restart pumps & reverse circ an additional 4bbls of fluid @ 5.4bpm/3750psi & did not hear any e-line movement. Pump 10bbls of fresh water & SID pumps. SIB injector. 12:00 - 12:15 0.25 STWHIP P WEXIT Hold PJSM for cutting CT. 12:15 - 13:00 0.75 STWHIP P WEXIT RlU hydraulic cutter to cut CT for slack management. Cut 367' of CT until e-line cable is exposed. Have 17053' of eline CT left on reel. Cement @ 1000psi compressive strength. 13:00 - 14:30 1.50 STWHIP P WEXIT Rehead & install SLB CTC. Pull test to 35k. Allow for 2.5' of eline. M/U UQC & rehead eline. Conduct eline conductivity test - OK. Meg eline - OK @ >20megs. Suspect CT is frozen. M/U swizzle stick & stab injector on well. 14:30 - 15:45 1.25 STWHIP P WEXIT RIH to 450' to thaw any possible ice in the CT. Establish circ. PUH to surface & jet BOP stack thoroughly. SIB injector & UD swizzle stick. M/U test cap. PfTest CTC & UQC to 3500psi. Break UQC & observe that eline cable has pulled off from the UQC. Cut off & boot end of e-line. M/U nozzle & stab injector on well. 15:45 - 17:00 1.25 STWHIP N SFAL WEXIT Pump one CT vol back into the reel in nomnal circ mode to complete slack management. 17:00 - 18:00 1.00 STWHIP N SFAL WEXIT Pop-off well. Cut 3' of CT to expose 2.5' of e-line. Rehead & install SLB CTC. Pull test to 35k. Circ @ 0.4bpm for 4 mins to warm up CT. M/U UQC & rehead eline. Circ @ 0.4bpm for 4 mins to wamn up CT. Conduct eline conductivity test - OK. Meg eline - OK. PfTest CTC & UQC to 3500psi - OK. 18:00 - 18:15 0.25 STWHIP P WEXIT Hold PJSM for MIU milling BHA. 18:15 - 18:45 0.50 STWHIP P WEXIT MIU window milling BHA #3 with a 3.80" HC DSM, 3.79" diamond string reamer, Baker straight Xtreme motor, 1 jt of 2-3/8" PH6 tbg, BHI DGS, DPS, EDC, P&C, SWP & LQC. BHA OAL - 89.77'. MIU injector. Zero SLB mechanical counter & open EDC. 18:45-21:40 2.92 STWHIP P WEXIT RIH window milling BHA #3. Shut in well while RIH till WHP Printed: 3/2612007 10:31 :30 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-42 A-42 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/15/2007 Rig Release: 3/25/2007 Rig Number: N1 Spud Date: 3/15/2007 End: 3/25/2007 3/18/2007 18:45 - 21:40 21:40 - 23:15 ~ t\'4 AA 23:15 - 00:00 3/19/2007 00:00 - 03:00 03:00 - 04:30 04:30 - 06:00 06:00 - 07:00 07:00 . 08:00 08:00 - 08:30 08:30 - 09:15 09:15 - 09:30 09:30 - 10:00 10:00 - 10:15 10:15 - 10:30 10:30 - 12:15 12:15 - 15:45 15:45 - 17:45 17:45 - 18:00 18:00 - 18:45 18:45 - 19:00 19:00 - 22:00 WEXIT builds to 1000psi. PIT well bore to 1000psi. Lost 100psi in 5mins. Bleed off WHP & continue RIH. Tag top of cement at 13,159'. WEXIT Mill cement. 2.8 bpm, 2250 psi, 40 fph, 1-2 K WOB. Full returns. Tag whipstock at 13,211'. Correct depth to 13,208'. I 3.8 win ow thru 4-1 2', - 0 slott Iner. pm, 2300-2500 psi, 3-4K WOB. Milled to 13209'. WEXIT Mill 3.8" window. 2.7 bpm, 2100-2660 psi, 0.5 fph, 5-6 K WOB. Slow milling Milled to 13211 '. WEXIT Mill 3.8" window. 2.7 bpm, 2000-3000 psi, 0.5 fph, 6K WOB. 2.92 STWHIP P 1.58 STWHIP P 3.00 STWHIP P 1.50 STWHIP P 1.50 STWHIP P WEXIT 1.00 STWHIP P WEXIT 1.00 STWHIP P WEXIT 0.50 STWHIP P WEXIT 0.75 STWHIP P WEXIT 0.25 STWHIP P WEXIT 0.50 STWHIP P WEXIT 0.25 STWHIP P WEXIT 0.25 STWHIP P WEXIT 1.75 STWHIP P WEXIT 3.50 STWHIP P WEXIT 2.00 STWHIP P 0.25 STWHIP P 0.75 STWHIP P WEXIT WEXIT WEXIT 0.25 DRILL P PROD1 3.00 DRILL P PROD1 Stacking wt. Backream up to 13150'. Ream down. Mill 3.8" window. 2.6 bpm, 2050-2800 psi, Stacking wt 1 ft off bottom. Back ream again and ream down. Stacking wt. Mill window from 13211.5' to 13212' with 2.65/2.65bpm, 2050/2600psi & 7k DWOB. Up Wt = 41.5k, Down Wt = 20k. Getting metal shavings on ditch magnets. Mill window & stall @ 13212.9' with 2.65/2.65bpm, 2050/2600psi & 7k DWOB. PUH. RBIH & ease into milling from 13208'. Mill down & stall again @ 13210.8'. Suspect string reamer is @ TOW/S. Backream/Ream window area 2x from 13200' to 13210'. See improvement in wt transfer. Mill window from 13210' to 13211' with 2.65/2.65bpm, 2050/2200psi & 0.5k DWOB. Mill window from 13211' to 13212' with 2.65/2.65bpm, 2050/2250psi & 0.8k DWOB. Mill window from 13212' to 13214' with 2.65/2.65bpm, 2050/2250psi, 2.5k DWOB & 4fph ave ROP. Control mill window from 13214' to 13215' with 2.65/2.65bpm, 2050/2200psi & 3.5k DWOB & 4fph ave ROP. Control mill & exit into fomnation @ 13216' with 2.65/2.65bpm, 2050/2200psi & 3.5k DWOB & 4fph ave ROP. Mill 10' of fomnation to 13226' with 2.55/2.55bpm, 2050/2400psi, 8fph ave ROP & 5.5k DWOB. Swap well bore to reconditioned 8.6ppg flopro mud with 12ppb K-G & 3% L-T. Meanwhile backream/dress window/rat hole 3x & drift 2x. Window looks clean. Geo seeing shublik shale fomnation in BUS. Tentative window depths are: TOWSITOW = 13208', BOW = 13216', TD = 13226'. Paint EOP @ 12000' & POOH window milling BHA #3. Hold PJSM for UD milling BHA. UD BHA #3 & inspect mills. Window mill gauge 3.80" go / 3.79" no-go & string mill gauge 3.78" go /3.77" no-go. Wear on window mill face indicate center crossed the liner wall. SAFETY MEETING. Review procedure, hazards and mitigation for MlU BHI drilling BHA. MlU BHI build BHA #4 with HC Bi-center bit, 3.2 deg motor and Printed: 3/2612007 10:31:30 AM WHILE THIS COMMENTS NO . STATE OF ALASKA .. ALA Oil AND GAS CONSERVATION cOMMWION REPORT OF SUNDRY WELL OPERATIONS D D D Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 425 359 0 o 0 0 15. Well Class after proposed work: Exploratory Development P 16. Well Status after proposed work: Oil P' Gas WAG 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development P Stratigraphic P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 85.5 KB 8. Property Designation: ADLO-047472 11. Present Well Condition Summary: Total Depth measured 13960 feet true vertical 9062 feet Effective Depth measured 13927 feet true vertical 9058 feet Casing Length Size MD Conductor 80' 20" 91.5# H-40 30' - 110' Surface 3089' 10-3/4" 45.5# NT-80 35' - 3124' Intermediate 13163' 7-5/8" 29.7# L-80 32' - 13195' Liner 880' 4-1/2" 12.6# L-80 13080' - 13960' Perforation depth: Measured depth: 13169' - 13927' True Vertical depth: 8933' - 9058' - Tubing: (size, grade, and measured depth) 4-1/2" 12.6# Packers and SSSV (type and measured depth) 7-5/8"x4-1/2" TIW HBBP-T o o o 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations X Oil-Bbl 51 Shut in 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Gary Preble Øt}:llb ~~' StimulateD Other 0 Mill OUT WaiverD Time ExtensionD Re-enter Suspended Well D 5. Permit to Drill Number: 195-0020 Exploratory Service 6. API Number: 50-029-22542-00-00 9. Well Name and Number: PBU A-42 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool Plugs (measured) Junk (measured) EIVED UtC 2 8 2006 13927' None f~rtiska (5i Gas Cons. Commis on If. . HI'ICnorage TVD 30' - 110' 35' - 3114' 32' - 8946' 8887' - 9062' >- ;..~.... Collapse 470 2480 4790 7500 Burst 1490 5210 6890 8430 sCANNED JAN 0 B 2007 - L-80 Surface - 12983' 12937' o o o Tubing pressure 226 o Service WDSPl Title Data Engineer Signature Phone 564-4944 sed 04/20{) R , G I Date 12/21/2006 h \ {i.-\ Submit Original Only . . A-42 DESCRIPTION OF WORK COMPLETE NRWO OPERATIONS EVENT SUMMARY 12/17/2006 CTU #9 w/1.75" CT. *** Continued from 12/16/06 WSR *** Continue to RIH with 3.70" OD dummy whipstock, tag at 13241', pickup and tagged again at 13235'. Pick up and attempt twice more while pumping down coil and tag at same spot. Set 8K down, still would not drift thru. POOH. Break off dummy whipstock drift and 3.63" OD round nose nozzel. MU 2 7/8" motor, 3.80" OD String Reamer and Diamond Parabollic Mill and RIH to 13208', tag liner top, rolled pump and got thru, saw motor work between 13223' and 13236', work this area up/down then drift to 13350' and POOH. Remove 3.80" string reamer and mill. MU 3.625" OD dummy whipstock for drift and RIH. After several attempts, unable to drift pass 13235' ctmd with a 3.62" OD Dummy Whipstock Drift. POOH. MU new 2 1/8" BOT MHA w/ 2.70" OD X 15' long dummy whipstock drift and RIH. Drifted with 2.70" OD dummy whipstock to 13350' CTMD with no problems. POOH. **** Continued on 12/18/06 WSR **** 12/18/2006 CTU #9 w/1.75" CT. *** Continued from 12/17/06 WSR *** Continue to POOH with 2.70" dummy whipstock drift. Freeze protect well with 38 bbl's of 60/40 methwater. Notify pad operator of well status and to leave well SHUT-IN. RD CTU #9. **** JOB COMPLETE **** FLUIDS PUMPED BBLS 269 60/40 METH 806 1% KCL XS 64 FLO PRO 1139 TOTAL . . {I.~." ~.,... l f" fL', ,! LiW ,I ~ ·U" ~ "~~ ,i'ä~ ,\ ~ {1 ij: \; i ! It '1J J "" .1',...., f ! n "d ;,~ U u';}j 'r Y L:1 5'ñ)r? !..WJ.'iI..... '."."L. \1 ~ ij' J ~ q ¡ ~ ií :\0' U ¡-, fi~ ï I!J\ Ú~l1 FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA OIL AlWD GAS CONSERVATION COltDlISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Garret Staudinger CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU A-42 Sundry Number: 306-309 Cf"'A' t..1....U::n) ÇEP 1 '1 2008 o:~.., r~~'ß."'...~· ,J ï ¿ C1J - Dear Mr. Staudinger: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED this/~ay of September, 2006 Encl. ¡ ~ Ò-bDJ AI. .1. n:lo,.. ,... 1. Type of Request: ~ Abandon o Suspend o Operation Shutdown o Perforate !..'..,w..".. ..... ... ....... .......... o Time Exte~'l!horage o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Other 2. Operator Name: 4. Current Well Class: / 5. Permit T~rill Number BP Exploration (Alaska) Inc. ~ Development D Exploratory 195-002 3. Address: D Stratigraphic D Service 6. API Number: / P.O. Box 196612, Anchorage. Alaska 99519-6612 50-029-22542-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: / property line where ownership or landownership changes: PBU A-42 Spacing Exception Required? DYes ~No 9. Property Designation: \10. KB Elevation (ft): 11. Field / Pool(s): ADL 047472 85.5' Prudhoe Bay Field / Prudhoe Bay Pool 12.. 'i .. .... \N ::f· '" ····i..·), ,. V·..i i "\i, .... ii· ...... ... ." Total Depth MD (ft): Total Depth TVD (ft):IEffective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13960 9062 13927 / 9058 13927 None Casina Lenath Size MD / TVD Burst CollaDse Structural Conductor 110' 20" 110' 110' 1490 470 Surface 3089' 10-3/4" 3124' 3114' 5210 2480 Intermediate 13163' 7-5/8" 13195' 8946' 6890 4790 Production Liner 880' 4-1/2" 13080' - 13960' 8887' - 9062' 8430 7500 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: / Tubing Grade: Tubing MD (ft): 13169' - 13927' / 8933' - 9058' 4-1/2",12.6# L-80 12983'/ Packers and SSSV Type: 7-5/8" x 4-1/2" TIW 'HBBP-T' packer I Packers and SSSV MD (ft): 12937' / 13. Attachments: 14. Well Class after proposed work: / ~ Description Summary of Proposal D BOP Sketch D Exploratory 181 Development D Service D Detailed Operations Program 15. Estimated Date for Octob~ 2~06 16. Well Status after proposed work: Commencing Operations: DOH DGas D Plugged ~ Abandoned 17. Verbal Approval: D~ DWAG DGINJ DWINJ D WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garret Staudinger, 564-4242 Printed Name Garret Staudinger Title CT Drilling Engineer Signature ~e-.i /' í A Prepared By Name/Number: OW~ Phone 564-4242 Date Cfl.Dfo~()L Terrie Hubble, 564-4628 " Commission Use Onlv I Sundry Number:_~ /J - r Y YT Conditions of approval: Notify Commission so that a representative may witness D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance Other: I Subsequent Form Required: \D - 4rfø Date 'l../z, ../J 6 '"f __ I 'ßrCOMMISSIONER APPROVED BY Approved Bv: THE COMMISSION Form 10-403 Revised 06/2006 ORIGINß1 \ Submit In Duplicate RBDMS 8Ft SEP I 2 1006 I'I¿ 11¡J/~ f/fJ-1'IoÞ . STATE OF ALASKA r ALASKA OIL AND GAS CONSERVATION COMMI SION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25 280 1"...J61't- q,llt/ '2.-O0,=, RECEIVED SEP 0 8 2006 . . Obp To: Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Garret Staudinger CTD Engineer Date: September 5, 2006 Re: Prep Prudhoe A-42 for CTD sidetrack Sundry approval is requested to prepare A-42 for a sidetrack. A-42 is a peripheral, pre-produced injector well drilled in 1995. It was placed in a ZNla target area bounded east and west by parallel faults. It produced 567 mbo through March 2006, when it was shut for low production. With no wellwork options available to enhance production, a sidetrack to a new area is planned. The sidetrack, A-42A, is scheduled to be drilled by Nordic 1 on or about November 20.2006. The plan calls for setting a setting a 4-1/2" Baker Monobore whipstock in the 4-1/2" slotted liner, and down squeezing 15.8 ppg / cement past it. A schematic diagram of the proposed sidetrack is attached for reference. "" 1 \- Pre-Rig Work 1) S Caliper liner and tubing 2) S Dummy GL V. 3) S Run dummy whipstock drift 4) 0 MIT-IA, and OA. ,/'. 5) 0 AC-PPPOT -IC, T IV) 6) E Set 4-1/2" Baker Monobore WS at 13270' ~ ~ 7) C Down squeeze past whipstock, 15.8 ppg cement for abandonment ~uls ~ G 8) 0 Bleed gas lift and production flowlines down to zero and blind flange· 9) 0 Remove wellhouse, level pad ~ The pre CTD work is slated to begin about November 1, 2006 pending sundry and permit. - Rig Work: 1) MIRV Nordic 1 and test BOPE to 250psi low and 3500psi high. 2) Mill 3.80" window at 13270' and 10' ofrathole in Shublik "B". 3) Drill 805' sidetrack into Zone 4B target with resistivity to a TD of 14075'. 4) Run solid 3 3116" liner, cement, and test liner lap to 2000psi. 5) Cleanout liner and perforate for production (~500 ft of perfs). 6) Freeze protect well and RDMO. ........... ~ ~ ~ Post-Rig Work 1) Install well house, flow line and gas lift valves. Garret Staudinger CTD Drilling Engineer 564-4242 CC: Well File Sondra Stewman/Terrie Hubble rREE = . 4" foIc'ð/ O'f ill/8.Ll-EAD= foIc'ð/O'f A-42 CJUl\ TOR= BAKER I\B. 8..'ð/ = 85.5' SAFETY NOTES: 91° HORIZONTAL WB.L ****WARNING: BF. 8..'ð/ = 54.67' MUST TURN OFF RADIO TRANSMITTER IN WEATHER KOP= 3200' MONITORING SHACK BEFOREANYWB.LWORK INVOLVING Max Angle = .8 @ 13795' EXPLOSIVES BEGINS. CONTACT PAD OPER. TBG CRIMPED Datum fvÐ = 13266' WHLE RUNNING COMPLETION @ 9457' wlm.ID OF PIPE @ Datum lVOss= 8800' ntlS DEPnt HASN'T BEEN DETERMINED YET. . 2197' \-14-112" HES HXO SSSV, D= 3.813"1 110-314" CSG, 45.5#, NT-SO, ID = 9.953" 3124' ~ ~ GAS LFr MANDRELS ST fvÐ lVD DEV TYPE VLV LATCH PORT DATE ¡,Minimum ID = 2.61" @ 13927' ~ 4 3007 2998 7 CAMeO OOM: BK 16 11/08104 TIW PACK OFF 3 6350 5286 58 CAMeO OOM: BK 16 11/08104 2 10185 7281 59 CAMeO OOM: BK 16 11/08104 1 12818 8619 59 CAMeO 50 BK 20 10/02/05 I 12921' 1-\4-1/2" HES X NIP, 10 = 3.813" I 8: Q 12937' 7" x 4-112" TIW HBBP- T A<R, ID - 3.917" - 1 I 12961' 4-1/2" HES X NIP, ID = 3.813" I I I 1 12972' H4-112" HES XN NIP, Ð = 3.725" I 14-112" TBG, 12.6#, L-SO, .0152 bpf, ID = 3.95S" I 12983· I- - 12983' 1-\4-1/2" WLEG I I 12967' H 8..MD IT LOGGED 03125/95 I 13080' -1 TIW 5S HIGH ANGLE HGRlA<R, 10 = 4.000" I I 7-5/8" CSG, 29.7#, L-80, 10 = 6.875" 13195' I I , I I , I , , I , , , I , , " , , 14-1/2" SLOTTED LNR, L-SO, 10 = 3.845" H ' , ' ----J 13927' TIW PACK OFF, 10= 2.61" I 13927' ~, ~ I PBTDH 1392T I ". ~-I 13960' HTIW GUŒSHOE I DATE REV BY COWM:NTS DATE REV BY COMM:NTS PRUDHOE BAY UNIT 21411996 ORIGINAL COMPLETION 11/20105 EZUPJC WAIVER 5FTY NOTE DELETID WB..L: A-42 05121/01 Rt¥TP CORRECroNS PERMIT No: ~ 950020 11/10102 ATl)lt1h WAIVER SAFETY NOTE API No: 50-029-22542-00 11/08104 JAFfTlP GLV C/o sa:: 35, T11 N. R13E 10102105 DAVfTlH GlV C/O 10109105 DAV/PAG GlV CORRECTIONS BP Exploration (Alaska) r 100 OL 10 0.001 1995 96 99 2000 61 !:)áe 02 04 05 5 ~ 100 L} L} -:: 50 o ü '- (J) ro 0::: ð A1ase Case Naïe b D te En:: Ra:e Firâ Ra:e Au::!. O::te Reserves BJR Faecast Erœ:I O::te os 1 D.ŒS211 Ae I:tiId 12131/2002 I:tiId I:tiId !Ð3A48 i'\II:ij 001311:2(03 i'\II:ij i'\II:ij 02 03 œ <t OL A-42 Reclassified as a Nonnal Well e ~ ~ L '15 -Q)-z.- Sub,icct: A-42 Reclassified as a Normal Well From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntcgrityEngillccr(t:~}BP.com> Dutc: Sat, 19 No\' 2005 21: 13:06 -0900 ~J1(i To: jim.__reg~@admin.state.ak.us~ winton_aubert@~dmi~1.st~~c.~k.us, "Rossberg, R Steven" Íl4<Rosshe!~S(ff,B!).com:>, "OPB, (JC3 Area Mgr" «JPBG~3 J Lcq;}Br~.com>, "GPB, GC3 WcIJp..,ad 1\\1l\ Lead" <GPBCJC3WellpadLead@BP.com>, "Carlson, Bnan H" <Bnan.Carlson@BP.com>, "(JPB, Wells Opt Eng" <GPBWcIlsOptEng@BP.com>, "GPB, Optimization Engr" <GPBOptimizationEngr@BP.com>, "Kurz, John" <john.kurz@BP.com>, "NSlJ, ADW Well Operations Supervisor" <NSUADWWeIlOperationsSupervisor@BP.eom>, "Engel, Harry R" <Engel HR(~}BP .com> CC: "Luckett, Ely Z. (VECO)" <luckcz@BP.com>, "Hughes, Andrea (VECO)" <hugha4@BP.com>, "Mielke, Robert L." <robcrt.miclke@ßP.com>, "NSU, ADW Well Integrity Engineer" <NS U ADWW ellIntegrityEngineer@BP.com> Hello all. Well A-42 has been reclassified from Waiver to Normal well status. An OGLV changeout fixed the TxlA communication. Chuck, would you please request the A Pad Operator to remove any waiver related signage from the wellhouse. Ely, would you please update AnnComm to reflect the Normal well status. Please call with any questions. Joe 1-907-659-5102 ~rli.Mt\Q!!::F' Ph(" ~, n" 2· 0'01:. ""'~"~tI~~ì\i;[;..J !Jt~ 'c' J () . I'J From: Mielke, Robert L. Sent: Saturday, November 19, 2005 7:35 PM To: NSU, ADW Well Integrity Engineer Cc: Luckett, Ely Z. (VECO); Hughes, Andrea (VECO) Subject: A-42 cancel waiver, Normal well Joe, I recommend A-42 have its TxlA communication waiver cancelled and be returned to Normal well status. The well was waivered for TxlA communication in 2002. An OGL V c/o on 10/02/05 restored tubing integrity, with a cold passing TIFL (well 81) on 10/29/05 and a warm passing TIFL today. Thanks Rob Mielke Well Integrity Engineer, BP Exploration, (Alaska) Inc. Office: 1-907-659-5525 Pager: 1-907-659-5100 #1923 Ipn GL.- bk ~ ~ 11/22/2005 8:46 AM .... STATE OF ALASKA -~. ALASKA. ,L AND GAS CONSERVATION CL .MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown []Stimulate [] Plugging [] Perforate [] Pull Tubing []Alter Casing [] Repair Well [] Other Misc - Cap 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2263' NSL, 1703' WEL, Sec 35, T11N, R13E At top of productive interval 426' SNL, 1661' WEL, Sec 11, T10N, R13E At effective depth N/A At total depth 1211' SNL, 1636' WEL, Sec 11, T10N, R13E 5. Type ~ well: Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 85.5 feet 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number A-42 9. Permit Number / Approval No. 95-O2 / 10. APl Number 50- 029-22542 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 13960 feet Plugs (measured) BKB 9072 feet 13960 feet Junk (measured) BKB9072 feet Length Size Cemented MD TVD Structural BKB Conductor 35' 20" 260 sx Arcticset 66' 66' Surface 3093' 10-3/4" 970 sx CS III / 375 sx 'G' 3124' 3049' Intermediate 13164' 7-5/8" 265 sx Class 'G' 13195' 8946' Production Liner 800' 4-1/2" Uncemented slotted liner 13080' - 13960' 8887' - 9062' Perforation depth: measured Slotted liner 13169' - 13927' true vertical Slotted liner 8933' - 9058 Tubing (size, grade, and measured depth) 4-1/2" L-80 to 12937' with 4-1/2" tailpipe to 12983' Packers and SSSV (type and measured depth) 7-5/8" HBBP-T Packer TIW @ 12937', 4.5" HES "HXO" SSSV @ 2197' 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure RECEIVED M/ y 0 2 2001 Alaska Oil & Gas Cons. Com~ssion Anch~-~e 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Oil [] Gas [] Suspended [] Daily Report of Well Operations 17. I hereby cej'tify, Chat th~,foregoj~ is true and ~c~,,.r. ect to the best of my knowledge Sig ne¢'/"'~~~--~ .,~~ ..... .,. Title Technical Assistant Form 10-404 Rev. 06/15/88 Service Prepared By Name/Number: Date .~//~'/~ / De Wayne Schnorr 564-5174 Submit In Duplicate A-42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 03/14/2001 MISC-CAP SUST.' EVAL TUBING PRE-MICROBE 03/31/2001 MISC-CAP SUST.' D/T (PRE MICROBE STIM) SUMMARY 03/14/2001 TIFL FAILED, IA INFLOWED 3382'. 03/31/2001 DRIFT W/2.50" CENT TO 13230' WLM (HAW), (13209' CORR. ELM) ALL CLEAR. RETURN WELL TO PCC. Fluids Pumped BBLS. 0 0 TOTAL Description No Fluids Pumped ON OR BEFoKE [:': R iq I T 'i J 'l/'20/'96 95 -- 002 B H C / ,a, 6) 2/ 'il 8/9 5 02/' {.} 8 ,." 9 5 95 .... 002 i) I J-- L.. / ~3 3062-'! :}590 0 2 / 0 8 /: 5 9~-'-002 ,~SR/,'::C! ..... 4. i2737 .... i3¢,'i6 ('i'.:: 'i2 95 .. ,, // /'" ./13ooo,-135oo (} !15 t' '.'il S t' ~} [5 i) 5 'l:') .5 / 9 0 5/'0 5/" 9 5 :a S "' 00 o 95'-002 8U8 S;E~[~q Vb .i~13062*-1s590 0 S / 'i '2 / .9 02/' 08/' 95 (.'J !:5 / {'.) ~:.i / 8 5 95 .... O0°~ 95-002 TVE,~LDt~ii/Ai61~//C,i~qE-"8900-9048 /'~lA/'/~ /Or '/"J L 05/' 05/' 95 95--002 ,/:~, t'"e d r" y d'i: tch samp'i es r'equi' fed"? w e i 'i c o r' e ¢I ? y e s 0 2/" 08/" 9 5 W~i'i i's i'n compl'iance __ lni'tia-i ~) R e c e 'i' v e d ".-,." y e ':.; n o - ,:: O 1,t ~,'i E N T S O,', } /31~o'- 13q, o'~ v ~urtc/Of~r~ /Rob ,) /J l // ¢ J'- ! STATE OF ALASKA AL,-,,_,KA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate X Plugging Pull tubing Alter casing __ Repair well Perforate__ Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2263'NSL, 1703'WEL, SEC. 35, T11N, R13E At top of productive interval 426' SNI, 1661' WEL, SEC. 11, TION, R13E At effective depth 1214' SNL, 1638' WEL, SEC. 11, TION, R13E At total depth 1211' SNL, 1636' WEL, SEC. 11, TION, R13E 5. Type of Well: Development Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) KB = 85.5' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number A-42 (31-11-10-13) 9. Permit number/approval number 95-02 / 10. APl number 50- 029-22542 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 35' Surface 3093' Intermediate 13164' Production Liner 12200' Perforation depth: measured 13960' feet 9072' feet 13960' feet 9072' feet Plugs (measured) Junk (measured) Size Cemented 20" 260 sx Arcticset 10-3/4" 970 sx CS 111/375 sx 7-5/8" 265 sx Class "G" 4-1/2" Uncemented slotted liner Slotted Liner 13169'- 13927' true vertical subsea Tubing (size, grade, and measured depth) 4-1/2", L-80 to 12984' Packers and SSSV (type and measured depth) Packer @ 12937' SSSV @ 2197' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Measured depth 66 3124 13195 13080-13960 True verticaldepth BKB 66 3059 8891 8833-9008 FEB 0 1 1996 Alaska Oil & Gas Cons. Comm[ssio~ A~chora.qe 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run ~ Daily Report of Well O S ,g n~d~"'~jA Form 1'0-404'Rev (~6~1'I 16. Status of well classification as: perat~.ns ~ ? Oil X Gas Suspended the ~g/oing/,//~"" . is~/a/~/d cSrrect to the best of my knowledge. Service SUBMIT IN DUPLICATE WELL A-42(31-11-10-13) _ STIM Operation 8/9/95 A Stimulation Wash Treatment was performed using the following fluids: SUMMARY: RIH with BHA #1. Circulate CT while RIH. Tagged TD @ 13,889' CTD. Wash 4- 1/2" slotted liner with 159 Bbls of Xylene with 2.5% MS-10 and 1% NE-10. Wash down from 13,300' - 13,889' CTD. Wash back up from TD to 13,200' CTD. Wellhead treating pressure increased from 640 psi to 900 during the Xylene stage, no notable breaks in pressure were seen. Circulate seawater to fill CT while POOH. Turned well over to PESO's and PCC for flowback and sampling. Fluids Pumped B B L S DESCRIPTION 108 159 267 Filtered Seawater Xylene with 2.5% MS-10 and 1.0% NE-10 FEB 0'1 1996 t~,laska Oil ,~ Gas ".~.on,,.' ~-' Cor.q.r~'~ission ,t\nchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 2 May 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL WELL Dear Sir/Madam, Enclosed, please find the data as described below: # DESCRIPTION 1 PLS FINAL BL+RF 1 PLS/STP FINAL BL+RF 1 GR/CCL FINAL BL+RF 1 PLS/STATIC FNL BL+RF ECC No. Run # 1 5661.07 Run # 1 5849.03 Run # 1 6420.00 Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please stFjn and 'return Petrotechnical Data Cente~ BP Exploration (Alaska) LO0 Ea~BensSn Boulevard MAY ,t- .-1995 ..... Alaska Oil & Gas Cons. Commissiort Anchorage D I::1 I I_1_ I I~1 G S I= I::! ~./I r" I::: S To: State of Alaska WELL LOG TRANSMITTAL Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs - A-42PH May 5, 1995 AK-MW-50002, AK-RB-95016 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy o2 this of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2" x 5" MD Gamma Ray Logs: 50-029-22542-80 1 Blueline 1 Rev Folded Sepia 2" x 5" TVD Gamma Ray Logs' 50-029-22542-80 1 Blueline 1 Rev Folded Sepia 1 LDWG Forn?atted tape with verification listings. RECEIVED Y 5 19 5 Alaska Oil & Gas Cons. Commission Anchorage 5631 Silverado'Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 95-02 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 5o-029-22542 -~,-~ 9. Unit or Lease Name 4. Location of well at surface , 2263'NSL, 1703' WEL, SEC. 35, T11N, R13E ~'i ',~ .';"~i i PrudhoeBayUnit Top Producing Interval ' ~"~_"y~. : }~~':~-'-':[~* '.' 10. Well Number At 426'SNL, 1661'WEL, SEC. 11, T10N, R13E ~;~'i,~ " : ~~~-~'~ 11.A'42(31'11'10'13)Field and Pool At Total Depth *~'~:: <: .... ~ PrudhoeBayField/Prudhoe BayPool 1211' SNL, 1636' WEL, SEC. 11, TION, R13E 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 85.6' ADL 47472 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 1~6. No. of Completions 1/9/95 1/31/95 2/4/95I N/A feet MSLI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 13960' MD/9072' TVD 13960' MD/9072' TVD YES [] NO []I 2197' feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run GR 23. CASING, LINER AND CEMENTING RECORD SE'FI'lNG DEPTH MD CASING SIZE WT. PER Fr. GRADE TOP BO-I-I-OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 35' 35' 30" 260 sx Arcticset (Approx.) 10-3/4" 45. 5# NT-80 35' 3124' 13-1/2" 970 sx CS 111/375 sx "G" 7- 5/8" 29. 7# L- 80 32' 13195' 9- 7/8" 265 sx Class "G" 4-1/2" 12. 6# L-80 13080' 13960' 6-3/4" Uncemented slotted liner 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MD) PACKER SET(MD) Slotted Liner 13169'- 13927' MD 4-1/2", L-80 12984' 12937' ;~6. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 3/25/95 Gas Lift Date of Test Hours Tested PRODUCTION FORFEsT PERIODOIL-BBL GAS-MCF WATER-BBL CHOKESIZE GAS-OIL RATIO Flow Tubing Casing Pressure 3ALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. Form 10~407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE  FORMATION TESTS GEOLOGIC MARKERS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Subsea Sag River 13140' 8833' Sh ublik 13168' 884 7' Sa dlerochit 13315' 8924' RECEIVED MAR I 1995 Aisska 0il & Gas Cons. Commission ~chora, .'~ 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed -- INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ~~ SHARED SERVICE ~~L: A-42 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: DAILY OPERATIONS ~'~ PAGE: 1 ACCEPT: 01/09/95 04:00 SPUD: RELEASE: 02/04/94 02:00 OPERATION: DRLG RIG: NABORS 28E WO/C RIG: 01/09/95 ( 1) TD: 110'( 0) 01/10/95 ( 2) TD: 1055' ( 945) 01/11/95 (3) TD: 3092' (2037) NIPPLE UP DIVERTOR MW: 0.0 VIS: 0 MOVE RIG FROM A-41 TO A-42. SPOTTED RIG. RIG ACCEPTED @ 0400 HRS ON 01/09/95. FILL PITS WITH FRESH WATER. TAKE ON H20 IN PITS. NIPPLE UP DIVERTOR. RIGGED UP DIVERTOR. DRILLING MW: 0.0 VIS: 0 RIGGED UP DIVERTOR. MADE UP BHA #1. TEST WELL CONTROL EQUIPMENT. FUNCTION TEST DIVERTER. TESTED DIVERTER. P/U AND ORIENT MOTOR AND MWD. 9 5/8" F2000S WITH 1.5 DEG BENT HOUSING MOTOR. CIRCULATED @ 110' FILL HOLE AND CHECK FOR LEAKS IN FLUID SYSTEM. TIGHTEN BOLTS IN RISER. DRILLED TO 420' SUCTION VALVE FAILED, CIRCULATE. REPAIRED SUCTION VALVE. DRILLED TO 1055' DRILLING DRILLED TO 3092'. MW: 0.0 VIS: 0 01/12/95 ( 4) TD: 3140' ( 48) 01/13/95 ( 5) TD: 4319' (1179) N/U BOP STACK MW: 0.0 VIS: 0 DRILLED TO 3140' CIRCULATED. OBTAINED BOTTOMS UP. POH TO 824'. SHORT TRIP TO BHA, NO CORRECTION. RIH TO 3140'. CIRCULATED, OBTAINED BOTTOMS UP. POH TO 824'_ PULLED BHA. RAN CASING. RUNG 77 JOINTS 10 3/4" 45.5# NT80 BTC. LAND HGR AND MU CMT HEAD. PUMPED SPACERS. TESTED HIGH PRESSURE LINES. PRESSURE TEST CMT LINES. MIXED AND PUMPED SLURRY. DROP BOTTOM PLUG. MIX AND PUMP TAIL SLURRY. DROP TOP PLUG AND PUMP 5 BBL H20. DISPLACED CMT W/ RIG PUMPS. BUMP PLUG. RIG UP AND PUMP 45 BBLS H20. MIXED AND PUMPED SLURRY. NIPPLE DOWN DIVERTER. LAY DOWN LANDING JT AND CASING TOOLS. RIGGED DOWN DIVERTOR. NIPPLE UP BOP STACK. RIH TO 4319' MW: 0.0 VIS: 0 NIPPLE UP BOP STACK. TEST BOPE. NO FIALURES. TESTED BOP STACK. MAD UP BHA #2. RIH TO 3044' TEST MWD AND RIH TO 3044'_ TAG CMT @ 3044'_ CIRCULATED. OBTAINED BOTTOMS UP. TEST 10 3/4" CSG. DRILL OUT FLOAT EQUIPMENT + 10' CMT TO 3140'. DRILL OUT 10' NEW FM TO 3150' CIRCULATED @ 3150' OBTAINED BOTTOMS UP. PERFORMED FORMATIONS INTEGRITY TEST. OBTAINED LEAK OFF. DRILLED TO 4319' POH TO 3124' AT 10 3/4" CASING SHOE. RIH TO 4319' RECEIVED MAR ~ ! 1995 A!~s~ OiJ & Gas Cons. Commission ' ~chora ~ ~~~~ mTn~T i A-42 RIG : NABORS 28E PAGE: 2 01/14/95 ( 6) TD: 5629' (1310) 01/15/95 ( 7) TD: 6840' (1211) 01/16/95 (8) TD: 8211' (1371) 01/17/95 ( 9) TD: 9490' (1279) 01/18/95 (10) TD:10020' ( 530) 01/19/95 (11) TD:l1521' (1501) 01/20/95 (12) TD:12877' (1356) RU ATLAS WESTERN & RUN GYRO MW: 0.0 VIS: 0 DRILLED TO 5010'. HANDLING EQUIPMENT FAILED, ABORT OPERATION. AUGER BEARING IN CUTTINS TANK FAILURE. REPLACED TANK. POH TO 3124'. CIRCULATED. RIH TO 5010' WASH F/ 4980 - 5010'. NO FILL. CIRCULATED. OBTAINED BOTTOMS UP. CIRCULATED WHILE FINISH INSTALLATION OF VRCA CUTTINGS TANK. DRILLED TO 5629'. MUD MOTOR FAILED. CIRCULATED. CBU W/ SWEEP. OBTAINED BOTTOMS UP. WIRELINE WORK. RU ATLAS WESTERN AND RUN GYRO. DRILLING MW: 0.0 VIS: 0 COMPLETED RUN WITH GYRO FROM 5350 - 0.0'. R/D ATLAS WESTERN. POH TO 825'. PULLED BHA. BHA STOOD BACK. SERVICED MWD COLLAR. SERVICED WEAR RING. RIH TO 3124' . SERVICED BLOCK LINE. LINE SLIPPED AND CUT. RIH TO 5530'. REAMED TO 5629'. BENCHMARK SURVEY @ 5530', NO FILL. DRILLED TO 5793'. DRILLING AND SURVEYS. ADDITIONAL SERVICES FAILED, CIRCULATE @ 5793'. HEADER BOX FAILED, WORK STRING. CIRCULATE AND REPLACED CUTTINGS INSULATED BOX. DRILLED TO 6840'. DRILLING MW: 0.0 VIS: 0 DRILLED TO 5460'. POH TO 5460' RIH TO 6840'. ON BOTTOM, NO FILL. DRILLED TO 8019'. CIRCULATED. OBTAINED BOTTOMS UP. POH TO 6545'. RIH TO 8019'. ON BOTTOM, NO FILL. DRILLED TO 8211' DRILLING MW: 0.0 VIS: 0 DRILLED TO 8695'. SURFACE LINES FAILED. REPAIR WASH OUT IN MUD LINE. DRILLED TO 9254' OBTAINED CLEAN RETURNS. o POH TO 7816'. SHORT TIRP TO 7816' RIH TO 9254'. NO FILL. DRILLED TO 9490'. RIH TO 10020' MW: 0.0 VIS: 0 DRILLED TO 9633' DRAW WORKS FAILED, WORK STRING REPAIR. CIRCULATE WHILE RECIPROCATE DP. REPLACED BRUSHES IN %1 AND 2 ELECTRIC MOTOR. WORK COMPLETED. DRILLED TO 10020' MUD PUMPS FAILED, SHORT TRIP. SCHOCK HOSE ON %1 PUMP LEAKING. CIRCULATE @ 10020'. OBTAINED CLEAN RETURNS. WHILE POH REMOVED SCHOCK HOSE. SLIP AND CUT DRILLING LINE WHILE WELD ON SCHOCK HOSE. LINE SLIPPED AND CUT. REPAIRED MUD PUMPS. FINISH WELDING AND INSTALL SCHOCK HOLE ON #1 PUMP. RIH TO 8000' SURFACE LINES FAILED. SHORT TRIP. TESTED SCHOCK HOSE AND STAND PIPE TO 4000 PSI. RIH TO 10020' NO FILL. DRILLING MW: 0.0 VIS: 0 DRILLED TO 11333'_ STARTED SCHEDULED WIPER TRIP. POH TO 9873' RIH TO 11333' NO FILL. DRILLED TO 11521' DRILLING DRILLED TO 12877' MW: 0.0 VIS: 0 RECEIVED MAR ;~! !995 Oil & Gas Cons. Commission ' Anchora ~ ~/_OP_E_RATION: __ RIG : NABORS 28E PAGE: 3 01/21/95 (13) TD:13189' ( 312) 01/22/95 (14) TD:13203' ( 14) 01/23/95 (15) TD:13203' ( 0) 01/24/95 (16) TD:13500' ( 297) RIH T/3124 MW: 0.0 VIS: 0 DRLG T/13110. CIRC. OBTAINED 100% ANNUL. VOL. POOH T/825. BEGIN PRECAUTIONARY MEASURES. WORK PIPE W/KELLY. PULLED BHA. LD MOTOR & DS59H. POOH T/CLEAN BALLED UP STABS. RETRIEVE WEAR BUSHING. TEST BOPE T/250/5000. HYDRILL 250/3000. GOOD TEST. AOGCC DIDN'T RESPOND T/REQUEST F/WITNESS. INSTALL WEAR BUSHING. MU BHA #4 & RIH T/3124. SERV. TOP RAM MW: 0.0 VIS: 0 RtH T/13189. BEGIN PRECAUTIONARY MEASURES. REAM TIGHT HOLE T/BTTM. DRILLED T/13203. REACHED PLANNED EOR. SECTION TD. CIRC @13203. OBTAIN 100% ANNUL. VOL. POOH T/8650. RIH T/13203. OBTAIN BU 100% ANNUL. VOL. SPOT 60 BBLS LCM PILL ON BTTM. LD DP T/802. STRAP OUT HOLE-NO CHANGE. PULL BHA. SERV. TOP RAM. CHANGE TOP RAM T/7-5/8" & BODY TEST BOP T/3000PSI. REMOVE WEAR RING. RIH T/1845 MW: 0.0 VIS: 0 RAN 7-5/8" CASG T/3120. CIRC VOL OF 7-5/8" OBTAIN CLEAN RETURNS 100% HOLE VOL. RAN CASG T/13195. 319 JTS 29.7# L-80 NSCC. CIRC LAST 2 JTS. T/BTTM. HANGER LANDED, UNABLE T/RECIP 7-5/8" CASG. HOLD PRE-CMT SFTY MTG. & RU CASG TOOLS. OBTAIN 100% HOLE VOL. PUMP SPACER, TEST HIGH PRESS LINES. TEST CMT LINES T/3500PUMP SPACER 15 BBLS H20 & 50 BBLS MCS-4, 10.9 PPG 6/6 BBLS 500 PSI SPACER & DROP BTTM PLUG. MIX & PUMP SLURRY. 56 BBLS. 15.8 PPG 265 SX CLASS G TT/3.15 HRS. RELEASED TOP PLUG. PUMP 5 BBLS H20. DISPLACED SLURRY HAD 100% RETURNS THROUGH THE CMT JOB. 12 BPM 1100/1200 PSI. CIP @ 19:45. FLTS HELD. PRESS TEST CASG T/3500. OK. LD LNDG JT. INSTALL & TEST 7-5/8 PACKOFF T/5000. CHANGE OUT 5" T/3.5" KELLY. CHANGE TOP RAMS T/3.5 X 6". TEST BOP STACK W/3.5 TEST JT. T/500/5000. TEST KELLY COCK & FLOOR VALVES. PRESS TEST T/5000. OK. INSTALL WEAR BUSHING. MU BHA #5. STRAP/PU/RIH T/1845. DRILLING MW: 0.0 VIS: 0 RIH T/13110. DRILL T/13203. REACHED EOR. SECTION TD. DRILL FLT EQUIP + 8' CMT T/13203. CON'T DRLG T/13213. STOP T/PERFORM FIT. CBU. OBTAIN 100% HOLE VOL. DRILLED T/13500. RECEIVED MAR 5!]995 Oil & Gas Cons. Commission Anchora' ~. a~_~~j~q% : A-42 7~P E RAT I ON : RIG : NABORS 28E PAGE: 4 01/25/95 (17) TD:13600' ( 100) 01/26/95 (18) TD:13600' ( 0) 01/27/95 (19) TD:13600' ( 0) 01/28/95 (20) TD:13465' ( 0) 01/29/95 (21) TD:13870' ( 405) CIRC @13600 MW: 0.0 VIS: 0 DRILLED T/13600. REACHED PLANNED EOR. CIRC @13600. OBTAIN 100% HOLE VOL. POOH T/13195. RIH T/13600. HOLE SWEPT W/SLUG. 100% HOLE VOL. POOH T/1163. UNABLE T/STRAP DUE T/HIGH WINDS. PULL BHA. HOLD PRE-OPS SFTY MTGS. RUN E-LOGS F/13195 T/13600. BHC/SONIC/DIFL/DENSITY/SP/GR. COMPLETED RUN W/PRODUCTION LOGGING TOOLS F/13195 T/13600. RIH W/MULE SHOE. & CIRC @13600. DRILLING CMT MW: 0.0 VIS: 0 CIRC @13600. OBTAIN 100% ANNUL. VOL. POOH T/13195. HAD T/STOP WHILE WOW. PHASE III CONDITIONS. RIH T/13600. CIRC OBTAIN 100% ANNUL VOL. PUMP 5 BBLS WATER. TEST LINES T/3000. PUMP 15 BBLS WATER, 33.5 BBLS 17PPG CMT, 5 BBLS WATER. KICKOFF PLUG. DISPLACE W/83.8 BBLS MUD. POOH T/12700. POOH 10 STNDS. CIRC @12670. OBTAIN 100% HOLE VOL. POOH & LD 61 JTS. DP. MU BHA #1 PU F2000S 2 DEGREE BH MOTOR & 'ORIENT. FLOW TEST MWD. RIH T/12902. TAGGED TOC @12902. OBSERVE 15000 LBF RESISTANCE. CIRC WHILE CLEANING PITS F/FLO PRO MUD. OBTAAIN 100% ANNUL VOL. CIRC CMT F/CONTAMINATED MUD. ISOLATED F/FLOPRO SYSTEM. DRILLED CMT T/13195. POOH F/BHA MW: 0.0 VIS: 0 KICKED OFF CMT PLUG. BUILDING 20 DEGREES/100'. DRILLED T/13272. DISPLACED HOLE T/FLOPRO MUD. POOH F/1.25 DEGREE BH MOTOR. DRILLING MW: 0.0 VIS: 0 POOH T/1175. TEST BOP STACK. WITNESS WAIVED BY DOUG AMOS OF AOGCC. TESTED PIPE RAMS, BLIND RAMS, CHOKE & KILL LINE VALVES, FLOOR SFTY VLAVES & CHOKE MANIFOLD T/500/5000. TEST ANNUL T/300/3000. LOWER PIPE RAMS FAILED TEST. REPLACE RAM SEAT SEALS & SEAL PLATE. BTTM RAM CHANGED OUT. TEST BOPE T/5000. OK. INSTALL WEAR BUSHING. CHANGED MOTOR T/1.25 DEG. BH F2000S. ORIENT. PU RLL TOOL & FLOW TEST MWD MOTOR. RIH T/3200. STOP T/SERV. DRILLING EQUIP. SERV. BLOCK LINE. SLIP & CUT. RIH T/13272. WASH T/BTTM. NO FILL. DRILLED T/13465. DRILLING MW: 0.0 VIS: 0 DRILLING T/13870. RECEIVED Oil & Gas Cons. Oommission Anchora RIG : NABORS 28E PAGE: 5 01/30/95 (22) TD:13916' ( 46) 01/31/95 (23) TD:13877' ( 0) 02/01/95 (24) TD:13960' ( 83) 02/02/95 (25) TD:13960' ( 0) DRILLING MW: 0.0 VIS: 0 DRILLED TO 13878' ROP DROPPED FROM 20.0 FT/HR TO 4.0 FT/HR. BIT QUIT. CIRCULATED. OBTAINED CLEAN RETURNS. POH TO 503.71' PULLED BHA. L/D RLL LOGGING TOOL. MADE UP BHA #3. RIH TO 6510'. DISCOVERED MISSING DP SCREEN. POH TO 1360'. RECOVERED SCREEN IN STD #9. RIH TO 13878'. WASH F/ 13828 - 13878' NO HOLE PROBLEMS. DRILLED TO 13916'. DRILLING MW: 0.0 VIS: 0 DRILLED TO 13980'. CIRCULATED. OBTAINED CLEAN RETURNS. POH TO 13195' RIH TO 13980'. NO HOLE PROBLEMS. CIRCULATED. CIRC AND CONDITION MUD. POH TO 7737'. PULLING OUT OF HOLE FOR HOLE OPENER RUN PRIOR TO COMPLETION WHEN DECISION WAS MADE TO SIDETRACK IN OPEN HOLE @ 13700', ON LOW SIDE OF HOLE, FOR BETTER QUALITY RESERVOIR ROCK. RIH TO KICKOFF POINT. REAMED TO 13718'. REAM INTERVAL F/ 13700 - 13718' TO ESTABLISH LEDGE TO KICK OFF. OBSERVED. DRILLED TO 13845'. KICKED OFF FROM 13718 - 13732' SIDETRACKED IN HOLE A-42A FROM 13732 - 13845' SHORT TRIP INTO PREVIOUSLY LOGGED HOLE TO BENCHMARK AND CHECK GR TOOL. POH TO 13656'. CONFIRMED GR FAILED, MWD WORKING. RIH TO 13845' RIH. DRILLED TO 13877' LOGGING MW: 0.0 VIS: 0 DRILLED TO 13960'. CIRCULATED. CIRCULATE FOR GEOLOGY CUTTINGS SAMPLES. OBTAINED CLEAN RETURNS. POH TO 13195'. RIH TO 13960'. NO HOLE PROBLEMS, SLID INTO SIDETRACK WITHOUT PROBLEMS. CIRCULATED AT 13960' OBTAINED CLEAN RETURNS. POH TO 206' PULLED BHA. L/D MOTOR AND MWD/GR. PROCESSING GR LOGS. SERVICED BLOCK LINE. LINE SLIPPED AND CUT. BHA RUN #4. 6.75" HOLEOPENER AND MWD FOR MAD LOGGING PASS. MADE UP BHA #4. RIH TO 13630' AT TOP OF TIE IN -- FOR MAD PASS INTERVAL. REAMED TO 13760'. CIRCULATE MW: 0.0 VIS: 0 REAMED TO 13960' FINISHED MAD LOGGING PASS. NO HOLE PROBLEMS. CIRCULATED. OBTAINED CLEAN RETURNS. POH TO 168' PULLED BHA. LD JARS, MWD/GR, HOLE OPENERR. RIGGED UP CSG HANDLING EQUIPMENT. RAN SLOTTED LINER, TIW LINER HANGER, AND 2 1/16" CIRC STRING. HANGER ASSEMBLY INSTALLED. RAN DRILLPIPE IN STANDS TO 13960'. CIRCULATED. CIRC BALL TO PKR. SET LINER HA_NGER W/ 3500 PSI AND TESTED ANNULUS TO 3500 PSI. RELEASED FROM LINER HANGER AND SHEARED OUT BALL SEAT. OBSERVED WELL FOR FLOW. OBSERVED WELL STATIC. CIRCUALTED AT 13960'. RECEIVED MAR 311995 A!~ska Oil & Gas Cons. Commission ~chora :~ RATION: 28E ~, ~ RI G · .~ RI~ . NABORS 02/03/95 (26) TD:13960' ( 0) 02/04/95 (27) TD: 13960' ( 0) PAGE: 6 MW: 0.0 VIS: 0 TEST scSSSV NIPPLE ACID cIRCULATE @ 13960'. HOLE DISPLACED WITH SEAWATER. sPOTTED DOWNHOLE. PULLED DRILLPIPE IN STANDS TO 13080'. ciRCULATED. PULLED 73' AND sPOTTED 20 BBLS BLEACH- CIRCULATED- DISPLACED WELL W/ 803 BBLS SEAWATER. OBTAINED LPIPE TO 13080'. LD 3 1/2" ........ S LAID DOWN DRIL - ~USHING RUN SINGLE _~ CLEAN t~jT~~ ~BG REMOVED WEAK m .... 4'1/2" L-80 TUBINg, DP AND z l/~u ~ · G TO 10784'. ~u~ ..... ~MBLY - VIA COMPLETION._ .~PJkN~,~TM TESTED scsSSV NIP~m ~o~ TIW PACKER ANP ~'~ ' ANNULUS- MW: 0.0 VIS: 0 4' HOLE RELEASE RIG _ ~ , ~IRCULATED AT 1295 ' -- .... e~uING TO DISPLACED WIT~ ~m~ ...... ACKER AT 12937'- PACKER .~ , GE LANDED- SETTIN~_P ~=eTED PACKER ASSEMBLY. 84 HAN R LEAKINg- ~=~ WN BOP ~9 ''~7' BALL SEAT .... ~CK RIGGED DO - AZ ND 50~ o~ · ED SET AT ~o · o INSTAL ED HANGER PLUG. _ .... o~np¥ COMPONENTS- TEST STACK.L INSTALLED XMAS TFOsm r ........ ADAPTER SPOOL AND TREE. REMOVED HANGER PLUG. FREEZE PROTEC WELL. INSTALLED HANGER PLUG. R/U LUBRICATOR AND INSTALLED BPV. WELL SECURED. RELEASE RIG @ 0200 HRS ON 02/04/95- SIGNATURE: DATE: RECEIVED [vlAR 3 1 t995 .A~s.l~ Oil & Gas Cons. Commission Anchora '~ gyro/data B.P. EXPLORATION A PAD, WELL NO. A-42 · PRUDHOE BAY, ALASKA - WOA Gyro Multishot Survey in 5" Drillpipe Survey date: 14 January, 1995 Job number: AK0195G248 RECEIVED MAR ~1 1995 A!~ska 0il & Gas Cons. Commission Anchor~ ' SR248.DOC gyrodat Gyrodata Incorporated P.O. Box 79389 HOUStOn. T .... 77970 713 '46i -3i 46 Fa:,:: 713/46! -0920 January 26, 1995 Ms. Marian Sloan B.P. Exploration Prudhoe Bay Drilling Department 900 E. Benson Blvd. Anchorage, Ak 99508 Re: Dear Ms. Sloan, A Pad, Well No. A-42 Prudhoe Bay, Alaska - WOA Enclosed please find one (1) original and ten copies (10) of the completed survey of Well A- 42 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future.. Sincerely Robert Shoup Assistant Operations Manager RS/gr Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER :AK0195G248 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL Sa, EQUIPMENT AND CHRONOLOGICAL REPORT SR248.DOC gy~lata 1. DISCUSSION, SURVEY CERTIFICATION SHEET SR248.DOC gyro/data DISCUSSION JOB NUMBER · AK0195G248 Tool 710 was run in A-41 on ATLAS 7/32" Wireline inside 5" drillpipe. The survey was run without problems. SR248.DOC SURVEY CERTIFICATION SHEET JOB NUMBER' AK0195G248 The data for this survey and the calculations for this survey were obtained and performed by me according to the standards and procedures as set forth by Gyrodata Limited, and are true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a true and correct directional survey of this well based on the original data obtained at the wellsite. Checked by :- TOM STODDARD OPERATIONS ENGINEER SR248.DOC gyro/data 2. SURVEY DETAILS SR248.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0195G248 CLIENT: B.P. EXPLORATION RIG: ATLAS LOCATION: A PAD WELL: A-42 LATITUDE: ...... 70.263000 N LONGITUDE: SURVEY DATE: 148.0W JANUARY 14, 1995 SURVEY TYPE : MULTISHOT IN 5" DRILLPIPE DEPTH REFERENCE: ROTARY TABLE EVELATION MAX, SURVEY DEPTH: 5350 ff. SURVEY TIED ONTO: N/A SURVEY INTERVAL: 100' UTM CO-ORDINATES: TARGET DIRECTION: 179.48 GRID CORRECTION: 0.0 CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: STODDARD SR248.DOC gy~data 3. OUTRUN SURVEY LISTING SR248.DOC A Gyroda t a D i r e c t i ona i Survey for B.P. EXPLORATION WELL: A-PAD WELL #A-42, 5" DRILLPIPE Location: NABORS 28E, PRUDHOE BAY FIELD, W.O.A. Job Number: AK0195G248 Run Date: 14-Jan-95 03:50:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.263000 deg. N Sub-sea Correction from Vertical Reference: 85.5 ft. Azimuth Corrected:: Gyro: Bearings are Relative to True North Proposed Well Direction: 179.480 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference B.P. EXPLORATION WELL: A-PAD WELL #A-42, Location: NABORS 28E, Job Number: AK0195G248 ~ Gyroda t a Direct 5" DRILLPIPE PRUDHOE BAY FIELD, W.O.A. i ona 1 Survey Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.0 0.0 -85.5 0.00 0.0 0.0 0.00 N 0.00 E 0 - 5350 FT. GYRO SURVEY RUN IN 5" DRILLP MEASURED DEPTHS REFERENCED TO THE NABORS 100.0 .03 95.12 100.0 . IPE. 28E R.'K.B. AT 85.5 FT. ABOVE SEA LEVEL 0 14.5 .03 .0 95.1 .00 S .03 E 200.0 .10 42.05 200.0 -. 300.0 .13 51.16 300.0 -. 400..0 .18 57.01 400.0 -. 500.0 .44 312.58 500.0 -. 600.0 1.42 292.41 600.0 -1. 1 114.5 .08 .1 62.3 2 214.5 .04 .3 53.1 3 314.5 .06 .6 53.8 7 414.5 .52 .8 25.4 4 514.5 1.03 1.8 322.3 .06 N .11 E .19 N .25 E .35 N .48 E .69 N .33 E 1.43 N 1.10 W 7 8 9 10 11 00.0 2.24 284.76 699.9 -2. 00.0 4.01 283.56 799.8 -3. 00.0 5.77 287.22 899.4 -6. 00.0 6.69 289.33 998.8 -9. 00.0 6.96 289.06 1098.1 -13. 4 614.4 .85 4.8 300.1 8 714.3 1.78 10.1 291.5 2 813.9 1.79 18.6 288.9 7 913.3 .95 29.5 288.7 7 1012.6 .27 41.4 288.8 2.40 N 4.14 W 3.72 N 9.43 W 6.03 N 17.64 W 9.45 N 27.94 W 13.35 N 39.17 W 12 13 14 15 16 00.0 6.32 301.00 1197.4 -18. 00.0 6.17 309.25 1296.9 -24. 00.0 6.07 310.54 1396.3 -31. 00.0 5.01 299.81 1495.8 -37. 00.0 3.89 282.15 1595.5 -40. 6 1111.9 1.52 52.8 290.1 9 1211.4 .91 63.4 292.6 8 1310.8 .17 73.6 295.1 5 1410.3 1.48 83.1 296.3 5 1510.0 1.76 90.8 296.0 18.17 N 49.61 W 24.40 N 58.50 31.24 N 66.68 36.85 N 74.49 W 39.74 N 81.59 W 17 18 19 20 21 00.0 4.02 254.54 1695.3 -40. 00.0 4.13 243.77 1795.0 -37. 00.0 3.26 186.51 1894.9 -33. 00.0 3.31 178.90 1994.7 -27. 00.0 3.25 178.02 2094.5 -22. 1609.8 1.89 96.7 294.1 1709.5 .77 101.8 291.3 1809.4 3.62 103.7 288.3 1909.2 .44 102.3 285.2 2009.0 .08 100.8 282.1 39.52 N 88.28 W 36.99 N 94.88 W 32.58 N 98.43 W 26.86 N 98.70 W 21.14 N 98.54 W A Gyroda t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: A-PAD WELL #A-42, Location: NABORS 28E, Job Number: AK0195G248 5" DRILLPIPE PRUDHOE BAY FIELD, W.O.A. Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2200.0 3.26 177.15 2194.4 2300.0 3.33 179.07 2294.2 2400.0 3.45 181.72 2394.0 2500.0 4.67 181.44 2493.8 2600.0 5.52 183.50 2593.4 -16.4 -10.6 -4.7 2.4 11.2 2108.9 .05 99.5 278.9 2208.7 .13 98.6 275.7 2308.5 .20 98.2 272.2 2408.3 1.23 98.4 268.1 2507.9 .86 99.5 263.0 15.47 N 98.30 W 9.73 N 98.12 W 3.82 N 98.16 · ~/ 3.25 S 98 35 . 12.12 S 98.75 W 2700.0 5.89 177.01 2692.9 2800.0 6.15 174.98 2792.3 2900.0 6.34 174.94 2891.7 3000.0 7.70 170.13 2991.0 3100.0 8.10 169.84 3090.0 21.1 31.6 42.5 54.6 68.1 2607.4 .74 101.2 257.4 2706.8 .34 103.3 251.7 2806.2 .19 106.3 245.9 2905.5 1.48 110.4 239.9 3004.5 .40 115.8 233.5 22.04 S 98.77 W 32.50 S 98.04 W 43.33 S 97.08 W 55.44 S 95.45 W 68.97 S 93.05 W 3200.0 9.04 171.92 3188.9 3300.0 11.34 174.12 3287.3 3400.0 13.28 175.26 3385.0 3500.0 17.01 179.17 3481.6 3600.0 21.06 181.27 3576.1 82.9 100.4 121.7 147.8 180.4 3103.4 .99 123.4 227.3 3201.8 2.33 134.5 221.2 3299.5 1.95 150.0 215.3 3396.1 3.87 171.4 209.9 3490.6 4.11 200.4 205.3 83.69 S 90.71 W 101.25 S 88.59 W 122.48 S 86.64 W 148.56 S 85.47 W 181.16 S 85.66 W 3700.0 23.97 179.30 3668.4 3800.0 27.16 181.53 3758.6 3900.0 29.18 181.62 3846.8 4000.0 32.33 182.27 3932.7 4100.0 35.80 183.77 4015.5 218.7 261.8 309.0 360.1 416.0 3582.9 3.00 235.6 201.4 219.45 S 85.81 W 3673.1 3.33 276.4 198.2 262.59 S 86.17 3761.3 2.03 321.9 195.8 309.78 S 87.48 ~ 3847.2 3.17 371.7 193.9 360.88 S 89.23 W 3930.0 3.57 426.9 192.5 416.81 S 92.21 W 4200.0 39.34 182.93 4094.8 4300.0 41.58 182.00 4170.9 4400.0 41.16 182.55 4245.9 4500.0 42.50 182.26 4320.4 4600.0 43.51 184.36 4393.5 476.8 541.6 607.6 674.2 742.2 4009.3 3.58 487.2 191.3 477.67 S 95.75 W 4085.4 2.32 551.4 190.3 542.50 S 98.54 W 4160.4 .55 616.9 189.4 608.54 S 101.16 W 4234.9 1.35 683.1 188.8 675.17 S 103.95 W 4308.0 1.76 751.0 188.3 743.25 S 107.90 W A Gyroda t a D i re c t i onal Survey B.P. EXPLORATION WELL: A-PAD WELL #A-42, Location: NABORS 28E, Job Number: AK0195G248 5" DRILLPIPE PRUDHOE BAY FIELD, W.O.A. MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet 4700.0 43.44 182.90 4466.1 4800.0 45.19 182.22 4537.7 4900.0 47.51 182.92 4606.7 5000.0 51.25 181.98 4671.8 5100.0 54.91 179.45 4731.9 5200.0 57.44 178.80 4787.5 5300.0 58.52 179.18 4840.5 5350.0 59.44 176.49 4866.3 Final Station Closure: Distance: 810.9 4380.6 880.6 4452.2 952.9 4521.2 1028,6 ~586.3 1108.5 4646.4 1191.6 4702.0 1276.4 4755.0 1319.2 4780.8 1325.64 ft DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 1.01 819.6 187.9 1.82 889.2 187.5 2.37 961.3 187.1 3.81 1037.0 186.7 4.18 1116.5 186.3 2.59 1198.9 185.8 1.13 1283,2 185.4 4.96 1325.6 185.1 Az: 185.12 deg. Page 3 HORIZONTAL COORDINATES feet 811.91 S 112.26 W 881.69 S 115.37 W 953.97 S 118.62 T,, 1029.79 S 121.85 1109.70 S 122.81 W 1192.75 S 121.53 W 1277.53 S 120.03 W 1320.34 S 118.41 W A~ Gyroda t a Di r e c t i ona i Survey for B.P. EXPLORATION WELL: A-PAD WELL #A-42, 5" DRILLPiPE Location: NABORS 28E, PRUDHOE BAY FIELD, W.O.A. Job Number: AK0195G248SS Run Date: 14-Jan-95 03:50:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.263000 deg. N Sub-sea Correction from Vertical Reference: 85.5 ft. Azimuth Corrected:: Gyro: Bearings are Relative to True North Proposed Well Direction: 179.480 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a Di r e c t i ona I Survey B.P. EXPLORATION WELL: A-PAD WELL #A-42, 5" DRILLPIPE Location: NABORS 28E, PRUDHOE BAY FIELD, Job Number: AK0195G248SS Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. CLOSURE H O R I Z O N T A L DIST. AZIMUTH C O O R D I N A T E S feet deg. feet -85.5 0.00 0.00 0.0 0.0 0.00 0.0 0.0 0.00 N 0.00 E 0 - 5350 MEASURED 100.0 FT. GYRO SURVEY RUN IN 5" DRILLPIPE. DEPTHS REFERENCED TO THE NABORS 28E · 09 49.75 185.5 -. R.'K.B. AT 85.5 FT. ABOVE SEA LEVEL 0 .07 .1 67.1 .05 N .10 E 200.0 300.0 400.0 500.0 600.0 .12 49.84 285.5 - .18 56.16 385.5 - .40 275.53 485.5 - 1.28 295.34 585.5 -1 2.12 285.87 685.5 -2 .2 .3 .6 .3 .3 .04 .05 .45 .95 .87 .3 54.4 .6 53.7 .8 29.5 1.8 279.3 4.8 303.3 .17 N .23 E .33 N .44 E .64 N .35 E 1.32 N .99 W 2.26 N 3.70 W 700.0 800.0 900.0 1000.0 1100.0 3.76 283.73 785.5 -3 5.53 286.71 885.5 -5 6.57 289.05 985.5 -9 6.93 289.09 1085.5 -13 6.40 299.57 1185.5 -18 .6 .9 .2 .2 .0 1.64 1.79 1.06 .35 1.37 10.1 292.7 18.6 289.2 29.5 288.7 41.4 288.8 52.8 290.0 3.53 N 8.67 W 5.70 N 16.49 W 8.99 N 26.56 W 12.86 N 37.74 W 17.59 N 48.36 W 1200.0 1300.0 1400.0 1500.0 1600.0 6.19 308.31 1285.5 -24 6.08 310.40 1385.5 -31 5.12 300.92 1485.5 -36 4.00 283.92 1585.5 -40 4.00 257.25 1685.5 -40 .2 .1 .9 .2 .3 .98 .25 1.34 1.73 1.88 63.4 292.4 73.6 294.8 83.1 296.2 90.8 296.0 96.7 294.3 23.69 N 57.48 W 30.50 N 65.79 W 36.27 N 73.68 W 39.45 N 80.87 W 39.54 N 87.62 W 1700.0 1800.0 1900.0 2000.0 2100.0 4.12 244.80 1785.5 -38. 3.34 191.88 1885.5 -33. 3.31 179.60 1985.5 -28. 3.26 178.10 2085.5 -22. 3.26 177.23 2185.5 -'16. .88 .35 .73 .11 .05 101.8 291.6 103.7 288.6 102.3 285.5 100.8 282.4 99.5 279.2 37.23 N 94.25 W 32.99 N 98.10 W 27.39 N 98.67 W 21.66 N 98.56 W 15.97 N 98.33 W A Gyroda t a D i re c t i ona i Survey B.P. EXPLORATION WELL: A-PAD WELL #A-42, 5" DRILLPIPE Location: NABORS 28E, PRUDHOE BAY FIELD, Job Number: AK0195G248SS W.O.A. Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. CLOSURE H 0 R I Z O N T A L DIST. AZIMUTH C 0 0 R D I N A T E S feet deg. feet 2200.0 3.32 178.90 2285.5 2300.0 3.44 181.49 2385.5 2400.0 4.57 181.46 2485.5 2500.0 5.45 183.34 2585.5 2600.0 5.86 177.49 2685.5 -11.1 -5.2 1.8 10.5 20.4 .12 .19 1.14 .89 .75 98.6 275.9 98.2 272.5 98.4 268.4 99.5 263.4 101.2 257.8 10.23 N 98.13 W 4.33 N 98.16 W 3.30 S 98.34 W 11.42 S 98.72 W 21.30 S 98.77 W 2700.0 6.13 175.12 2785.5 2800.0 6.33 174.94 2885.5 2900.0 7.63 170.39 2985.5 3000.0 8.08 169.85 3085.5 3100.0 9.01 171.85 3185.5 30.9 41.8 53.9 67.5 82.4 .37 .20 1.41 .45 .97 103.3 252.1 106.3 246.3 110.4 240.2 115.8 233.7 123.4 227.5 31.78 S 98.09 W 42.65 S 97.14 W 54.77 S 95.54 W 68.35 S 93.16 W 83.18 S 90.79 W 3200.0 11.30 174.07 3285.5 3300.0 13.29 175.28 3385.5 3400.0 17.18 179.26 3485.5 3500.0 21.36 181.07 3585.5 3600.0 24.57 179.72 3685.5 100.1 121.8 149.1 184.3 226.8 2.31 1.96 3.88 3.99 3 .07 134.5 221.3 171.4 215.2 200.4 209.7 235.6 204.9 276.4 200.8 100.92 S 88.63 W 122.60 S 86.63 W 149.92 S 85.48 W 185.08 S 85.68 W 227.61 S 85.88 W 3700.0 27.78 181.56 3785.5 3800.0 30.60 181.92 3885.5 3900.0 34.54 183.22 3985.5 4000.0 38.93 183.03 4085.5 4100.0 41.50 182.11 4185.5 276.2 332.0 395.7 469.7 554.5 2.93 2.54 3.42 3.58 1.97 321.9 197.4 371.7 194.9 426.9 193.0 487.2 191.5 616.9 190.1 276.97 S 86.57 W 332.81 S 88.27 W 396.53 S 91.13 W 470.54 S 95.34 W 555.39 S 99.05 W 4200.0 41.87 182.39 4285.5 4300.0 43.40 184.13 4385.5 4400.0 43.91 182.72 4485.5 4500.0 46.80 182.70 4585.5 4600.0 52.08 181.40 4685.5 643.0 734.8 829.7 930.7 1046.9 .98 1.71 1.23 2.20 3.89 .. 683.1 189.1 751.0 188.3 889.2 187.8 961.3 187.2 1116.5 186.6 643.95 S 102.64 W 735.76 S 107.47 W 830.81 S 113.10 W 931.77 S 117.63 W 1048.02 S 122.07 W A. Gyroda t a D i r e c t i ona I Survey B.P. EXPLORATION WELL: A-PAD WELL ~A-42, 5" DRILLPIPE Location: NABORS 28E, PRUDHOE BAY FIELD, W.O.A. Job Number: AK0195G248SS SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. Page HORIZONTAL COORDINATES feet 4700.0 57.34 178.82 4785.5 1188.6 4780.8 59.44 176.49 4866.3 1319.2 2.64 4.96 1198.9 185.8 1325.6 185.1 1189.73 S 1320.34 S 121.58 W 118.41 W Final Station Closure: Distance: 1325.64 ~t Az: 185.12 deg. gyro/data 4. QUALITY CONTROL SR248.DOC Quality Control Comparisons B.P. EXPLORATION WELL: A, PAD WELL #A-42, Location: NABORS 28E, Job Number : AK0195G248 INRUN/OUTRUN Comparison 5"DP PRUDHOE BAY FIELD, / AK0195G248 W.O.A. INRUN OUTRUN Depth Inc Inc Delta 500.0 .31 .44 -. 132 1000.0 6.50 6.69 -.190 1500.0 4.92 5.01 -.088 2000.0 3.39 3.31 .081 2500.0 4.63 4.67 -. 041 3000.0 7.71 7.70 .004 3500.0 16.82 17.01 -.193 4000.0 32.39 32.33 .062 4500.0 42.49 42.50 -.010 5000.0 51.08 51.25 -.163 5350.0 59.44 59.44 -.001 INRUN Az 318.00 290.57 300.02 179.00 182.95 171.20 179.53 181.29 181.42 181.59 176.71 For Inclinations Greater than 10 degrees: Average Inclination Difference Average Azimuth Difference = -.0609 = -.3242 deg. deg. OUTRUN Az 312.58 289.33 299.81 178.90 181.44 170.13 179.17 182.27 182.26 181.98 176.49 Delta 5.420 1.243 .215 .108 1.505 1.076 .359 -.981 -.835 -.393 .228 ,,gyro/data .QUALITY CONTROL REPORT JOB NUMBER: AK0195G248 TOOL NUMBER: 710 MAXIMUM GYRO TEMPERATURE: 72.0 c MAXIMUM AMBIENT TEMPERATURE: 88.0 c MAXIMUM INCLINATION: 59.44 AVERAGE AZIMUTH: 185.12 WIRELINE REZERO VALUE: no correction 1.8 FT. REZERO ERROR / K: n/a CALIBRATION USED FOR FIELD SURVEY: 21-DECEMBER-94 CALIBRATION USED FOR FINAL SURVEY: 21-DECEMBER-94 PRE JOB MASS BALANCE OFFSET CHECK: N/A POST JOB MASS BALANCE OFFSET CHECW- · CONDITION OF SHOCK WATCHES N/A N/A UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY 5350 59.44 176.49 4865.9 -1320.11 -118.40 FINAL SURVEY 5350 59.44 176.49 4866.3 -1320.34 -118.41 SR248.DOC gyro/data FUNCTION TEST JOB NUMBER ' AK0195G248 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 4800 45.19 45.19 45.19 45.19 45.19 AZIMUTH M.D. ft 1 2 3 4 5 4800 182.74 182.62 182.51 182.44 182.22 SR248.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR248.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK0195G248 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 707 GYRO SECTION A0085 DATA S ECTI ON A0002 POWER SECTION A0052 COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A00 74 A0079 A0042 BACKUP TOOL No. 046 GYRO SECTION A0083 DATA SECTION A0025 POWER SECTION B0042 COMPUTER POWER SUPPLY PRINTER INTERFACE A0078 BIG A0082 A0052 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 7/32' RUNNING GEAR 2 1/2" System using 3"eccentric weight bar and 3.5" heat shield. TOTAL LENGTH OF TOOL: 25.5 feet MAXIMUM O.D.: 3.5inches TOTAL WEIGHT OF TOOL: 300Lbs SR248.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK0195G248 01/14/95 1600 MARK AIR TO FAIRBANKS 1710 ARRIVE FAIRBANKS, PLANE BAD(CARGO DOOR) 1930 FLIGHT TO DEADHORSE CANCELLED 2230 RETURN TO ANCHORAGE 2330 ARRIVE ANCHORAGE, TRY TOMMORROW ON ALASKA 01/15/95 0500 leave house 0650 ALASKA T~) SLOPE 0930 ARRIVE DEADHORSE 1000 LOAD OUT TOOLS. FOR JOB PM 1300 LEAVE SHOP 1345 ARRIVE LOCATION 1830 MU TOOL, RU ATLAS, PU TOOL, STAND BY 1800 PU TOOL RIH INRUN SURVEY 2035 15650' SURVEY OUT 2200 12000' 01/16/95 0000 7000' SR248.DOC gyro/data 023O LAY DOWN TOOL. RD ATLAS. 0330 RTN TO ATLAS. 0415 ARRIVE ATLAS. PUT EQUIPMENT UP. 1100 Process survey. CALIBRATION GOOD. GOOD AGREEMENT WITH MWD. 1500 DROP SURVEY OFF AT BOC. 1300 PROCESS SURVEY. GOOD AGREEMENT WITH M.W.D. 1400 STAND BY FOR NK-19. TOMORROW. 01/17/95 1100 GYRO NK-19 for Wednesday. 1130 mark air to anchorage. 1600 arrive anchorage. CHRONOLOGICAL REPORT JOB NUMBER: AK0195G248 SR248.DOC SPE, ,f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A~ 42 ST NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 020195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -85.42 100 100.00 14.58 200 200.00 114.58 300 300.00 214.58 400 400.00 314.58 0 0 N .00 E .00 0 1 S 84.88 E .03 0 6 N 42.05 E .09 0 7 N 51.16 E .03 0 10 N 57.01 E .05 .00N .00E .00 .00S .03E .00 .06N .liE -.06 .20N .26E -.19 .35N .48E -.35 500 500.00 414.58 600 599.98 514.56 700 699.93 614.51 800 799.77 714.35 900 899.39 813.97 0 26 N 47.42 W .52 1 25 N 67.59 W 1.02 2 14 N 75.24 W .85 4 0 N 76.44 W 1.77 5 46 N 72.78 W 1.79 .70N .33E -.70 1.43N 1.10W -1.44 2.40N 4.14W -2.44 3.72N 9.43W -3.80 6.03N 17.63W -6.19 1000 998.80 913.38 1100 1098.09 1012.67 1200 1197.42 1112.00 1300 1296.82 1211.40 1400 1396.25 1310.83 6 41 N 70.67 W .95 6 57 N 70.94 W .27 6 19 N 59.00 W 1.52 6 10 N 50.75 W .91 6 4 N 49.46 W .17 9.44N 27.92W 13.35N 39.15W 18.16N 49.59W 24.40N 58.47W 31.23N 66.65W -9.70 -13.70 -18.61 -24.93 -31.84 1500 1495 . 78 1410 . 36 1600~.47 1510.05 1700 .24 1609.82 1800 1794[~8~1709.56 1900 1894.81 1809.39 5 0 N 60.19 W 1.48 3 53 N 77.85 W 1.76 4 1 S 74.54 W 1.89 4 7 S 63.77 W .77 3 15 S 6.51 W 3.62 36.84N 74.46W 39.73N 81.56W 39.51N 88.26W 36.98N 94.87W 32.56N 98.42W -37.52 -40.46 -40.30 -37.84 -33.45 2000 1994.64 1909.22 2100 2094.48 2009.06 2200 2194.32 2108.90 2300 2294.15 2208.73 2400 2393.98 2308.56 3 18 S 1.10 E .44 3 15 S 1.98 E .08 3 15 S 2.85 E .05 3 19 S .93 E .13 3 27 S 1.72 W .20 26.85N 98.69W 21.13N 98.53W 15.46N 98.29W 9.71N 98.10W 3.80N 98.15W -27.74 -22.02 -16.35 -10.60 -4.69 2500 2493.72 2408.30 2600 2593.32 2507.90 2700 2692.83 2607.41 2800 2792.27 2706.85 2900 2891.68 2806.26 4 40 S 1.44 W 1.22 5 31 S 3.50 W .87 5 53 S 2.99 E .74 6 9 S 5.02 E .34 6 20 S 5.06 E .19 3.27S 98.34W 12.14S 98.74W 22.07S 98.76W 32.53S 98.03W 43.37S 97.07W 2.38 11.25 21.17 31.64 42.48 3000 2990.92 2905.50 3100 3089.97 3004.55 3200 3188.85 3103.43 3300 3287.26 3201.84 3400 3384.94 3299.52 7 41 S 9.87 E 1.48 8 6 S 10.16 E .40 9 2 S 8.08 E .99 11 20 S 5.88 E 2.33 13 16 S 4.74 E 1.96 55.47S 95.44W 69.00S 93.04W 83.71S 90.70W 101.27S 88.59W 122.50S 86.63W 54.60 68.15 82.89 100.46 121.71 RECEIVED ~AF~ ~ i 1995 A!~ska 0[1 & Gas Cons. Commission Anchor~ SPEk_f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A- 42 ST 500292254271 NORTH SLOPE COMPUTATION DATE: 3/ 1/9 DATE OF SURVEY: 020195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DIRECTI DEGREES DLS TOTAL ON RECTANGULAR COORDINATES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3500 3481.46 3396.04 3600 3575.97 3490.55 3700 3668.34 3582.92 3800 3758.54 3673.12 3900 3846.68 3761.26 17 0 S .83 21 3 S 1.27 23 58 S .70 27 9 S 1.53 29 10 S 1.62 E 3.87 148.58S 85.47W W 4.11 181.18S 85.65W E 3.01 219.46S 85.80W W 3.33 262.60S 86.17W W 2.02 309.79S 87.46W 147.80 180.40 218.68 261.81 308.98 4000 3932.61 3847.19 4100 4015.44 3930.02 4200 4094.68 4009.26 4300 4170.76 4085.34 4400 4245.80 4160.38 32 19 35 47 39 20 41 34 41 9 2.27 3.77 2.93 2.00 2.55 W 3.17 360.89S 89.21W W 3.57 416.81S 92.20W W 3.58 477.67S 95.74W W 2.32 542.48S 98.52W W .56 608.52S 101.14W 360.06 415.95 476.78 541.57 607.58 4500 4320.31 4234.89 4600 4393.44 4308.02 4700 4466.00 4380.58 4800 4537.55 4452.13 4900 4606.56 4521.14 42 30 43 30 43 26 45 11 47 30 2.26 4.36 2.90 2.22 2.92 W 1.35 675.15S 103.94W W 1.75 743.23S 107.89W W 1.01 811.89S 112.24W W 1.81 881.67S 115.36W W 2.37 953.94S 118.61W 674.18 742.22 810.84 880.59 952.82 5000 4671.65 4586.23 5100 4731.72 4646.30 5200 4787.38 4701.96 5300 4840.40 4754.98 5350 4866.16 4780.74 51 15 54 54 57 26 58 31 59 26 1.98 .55 1.20 .82 3.51 W 3.81 1029.76S 121.84W E 4.18 1109.68S 122.79W E 2.59 1192.73S 121.51W E 1.13 1277.50S 120.02W E 4.96 1320.31S 118.40W 1028.61 1108.52 1191.58 1276.36 1319.18 5362 4872.27 4786.85 5458 4920.87 4835.45 5553 4969.35 4883.93 5655 5021.49 4936.07 5750 5069.54 4984.12 59 42 S 59 42 S 59 5 S 59 17 S 60 0 S 2.40 2.70 2.40 3.60 3.60 E 8.22 1330.69S 117.86W E .27 1413.78S 114.16W E .69 1495.67S 110.51W E 1.03 1583.01S 105.94W E .74 1664.91S 100.78W 1329.57 1412.69 1494.61 1581.98 1663.93 5846 5117.07 5031.65 5940 5163.98 5078.56 6035 5211.31 5125.89 6130 5258.42 5173.00 6224 5306.64 5221.22 60 60 60 59 58 24 0 24 54 30 3.40 3.60 3.20 3.10 3.10 E .46 1747.75S 95.72W E .46 1829.51S 90.72W E .56 1912.00S 85.82W E .54 1993.96S 81.31W E 1.49 2074.75S 76.93W 1746.81 1828.62 1911.14 1993.14 2073.96 6319 5356.25 5270.83 6415 5406.45 5321.03 6511 5456.15 5370.73 6606 5506.01 5420.59 6701 5555.75 5470.33 58 30 58 35 58 35 58 24 58 35 2.90 2.50 2.90 2.90 3.10 E .18 2155.58S 72.69W E .37 2237.58S 68.83W E .36 2318.92S 64.99W E .21 2400.17S 60.88W E .28 2481.23S 56.63W 2154.84 2236.86 2318.23 2399.52 2480.61 SPEk._.-SUN DRILLING SERVICES ANCHOR3kGE ALASKA PAGE SHARED SERVICES DRILLING PSU/a-42 ST 500292254271 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 020195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6797 5605.53 5520.11 6893 5656.02 5570.60 6988 5706.07 5620.65 7083 5755.93 5670.51 7179 5805.61 5720.19 58 58 58 58 58 24 24 17 24 47 S 2.70 E .41 2562.36S 52.52W S 2.70 E .00 2644.33S 48.65W S 2.40 E .29 2725.45S 45.04W S 2.90 E .46 2806.24S 41.30W S 1.90 E .99 2887.57S 37.89W 2561.77 2643.78 2724.93 2805.75 2887.11 7274 5854.60 5769.18 7369 5902.90 5817.48 7465 5951.61 5866.19 7560 6000.85 5915.43 7656 6049.89 5964.47 59 59 59 58 59 24 35 0 54 12 S 2.00 E .64 2969.37S 35.11W S 2.20 E .28 3051.31S 32.10W S 1.30 E 1.03 3133.32S 29.59W S 1.50 E .21 3215.07S 27.60W S 1.10 E .48 3296.83S 25.74W 2968.93 3050.89 3132.92 3214.69 3296.46 7751 6099.15 6013.73 7845 6148.99 6063.57 7941 6199.43 6114.01 8036 6249.16 6163.74 8131 6298.42 6213.00 58 58 58 58 58 24 5 17 42 47 S .20 E 1.17 3378.15S 24.82W S .80 W .95 3458.70S 25.24W S .50 W .34 3540.05S 26.16W S .50 W .42 3621.19S 26.87W S .80 W .29 3702.36S 27.79W 3377.79 3458.33 3539.66 3620.80 3701.95 8226 6347.01 6261.59 8321 6396.27 6310.85 8416 6445.86 6360.44 8513 6496.83 6411.41 8608 6545.87 6460.45 59 58 58 58 58 12 30 24 35 54 S .80 W .42 3783.22S 28.92W S 1.50 W .97 3864.70S 30.55W S 2.20 W .64 3945.42S 33.16W S 3.40 W 1.07 4028.49S 37.22W S 2.90 W .55 4109.19S 41.66W 3782.80 3864.27 3944.96 4027.99 4108.64 8700 6593.20 6507.78 8797 6643.20 6557.78 8894 6693.02 6607.60 8988 6742.16 6656.74 9085 6792.25 6706.83 59 59 58 58 58 5 30 35 30 47 S 2.90 W .22 4187.86S 45.65W S 1.90 W .97 4271.99S 49.17W S 3.60 W 1.77 4354.97S 53.15W S 3.60 W .11 4435.15S 58.20W S 2.90 W .69 4517.25S 62.86W 4187.28 4271.37 4354.31 4434.44 4516.49 9179 6841.59 6756.17 9273 6890.89 6805.47 9368 6941.28 6855.86 9463 6991.25 6905.83 9556 7039.91 6954.49 58 58 58 58 58 24 0 5 24 42 S 2.40 W .62 4597.98S 66.59W S 2.20 W .46 4677.42S 69.79W S 2.60 W .37 4758.16S 73.17W S 2.00 W .62 4838.85S 76.41W S .60 E 2.40 4918.38S 77.38W 4597.19 4676.60 4757.30 4837.96 4917.48 9650 7088.37 7002.95 9746 7137.65 7052.23 9841 7187.14 7101.72 9936 7236.94 7151.52 10030 7286.26 7200.84 58 59 58 58 58 54 0 24 17 42 S 1.00 E .42 4998.38S 76.26W S 1.00 E .10 5080.22S 74.83W S 1.00 E .63 5161.61S 73.41W S .10 E .81 5242.39S 72.64W S .20 E .43 5322.87S 72.43W 4997.49 5079.33 5160.73 5241.52 5322.00 SPEk..-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 ST NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 020195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10125 7335.34 7249.92 10220 7384.34 7298.92 10315 7433.74 7348.32 10408 7483.18 7397.76 10500 7532.53 7447.11 58 59 58 57 57 54 12 5 30 42 S .60 E .42 5403.92S 71.86W S 1.30 E .70 5485.62S 70.50W S 1.30 E 1.16 5566.69S 68.66W S 1.80 E .79 5645.16S 66.54W S 1.60 E .28 5722.90S 64.23W 5403.04 5484.75 5565.83 5644.32 5722.08 10593 7582.19 7496.77 10689 7632.88 7547.46 10784 7683.63 7598.21 10880 7733.99 7648.57 10974 7784.21 7698.79 57 58 58 58 58 47 5 0 0 5 S 1.10 E .47 5801.58S 62.38W S 1.30 E .36 5882.53S 60.68W S 1.60 E .29 5963.87S 58.63W S 1.80 E .18 6044.44S 56.23W S 2.00 E .21 6124.91S 53.56W 5800.78 5881.73 5963.10 6043.68 6124.17 11070 7834.45 7749.03 11161 7882.52 7797.10 11257 7932.98 7847.56 11352 7983.87 7898.45 11447 8034.69 7949.27 58 58 57 57 57 17 17 47 30 54 S 2.40 E .41 6205.88S 50.45W S .80 E 1.49 6283.68S 48.28W S 1.50 E .81 6364.56S 46.66W S 1.10 E .48 6444.88S 44.84W S .80 E .50 6525.26S 43.50W 6205.16 6282.98 6363.88 6444.21 6524.60 11538 8083.02 7997.60 11633 8133.67 8048.25 11729 8184.33 8098.91 11822 8234.09 8148.67 11916 8283.94 8198.52 58 57 58 57 57 0 47 0 47 42 S 1.00 E .22 6602.45S 42.29W S .40 E .57 6683.19S 41.30W S 1.00 E .57 6763.93S 40.32W S 1.10 E .23 6843.25S 38.86W S .60 E .46 6922.25S 37.69W 6601.80 6682.54 6763.29 6842.61 6921.62 12012 8335 . 38 8249.96 12105 8384 . 07 8298 . 65 12200 8433.79 8348.37 12291 8481.54 8396.12 12385 8530 . 87 8445 . 45 58 58 58 58 58 5 24 24 24 24 S .10 W .74 7004.24S 37.33W S .80 E .89 7082.92S 36.85W S .20 E .54 7163.74S 36.15W S .40 E .19 7241.36S 35.74W S .20 E .18 7321.53S 35.32W 7003.62 7082.29 7163.11 7240.74 7320.91 12479 8579.46 8494.04 12572 8627.09 8541.67 12666 8674.57 8589.15 12760 8722.64 8637.22 12854 8770.77 8685.35 59 59 59 59 59 0 35 30 12 12 S .30 W .79 7401.45S 35.39W S 1.00 W .91 7481.67S 36.30W S .30 W .65 7562.42S 37.22W S 1.00 W .71 7643.54S 38.14W S .50 W .46 7724.26S 39.20W 7400.82 7481.03 7561.77 7642.88 7723.59 12949 8819.35 8733.93 13042 8867.26 8781.84 13111 8903.47 8818.05 13149 8922.96 8837.54 13200 8949.14 8863.72 59 58 58 58 58 5 47 35 54 58 S .50 W .11 7805.60S 39.91W S .60 W .34 7885.18S 40.67W S .60 W .29 7944.73S 41.29W S .50 W .83 7976.85S 41.60W S 1.10 W 1.02 8020.30S 42.21W 7804.91 7884.49 7944.02 7976.14 8019.59 SPE~ .... -SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 ST 5oo292254271 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 020195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPER3kTOR: BP EXPLORATION FT. TRUE SUB-SEA COURS COURSE DLS MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES DG/100 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERT. SECT. 13220 8958.94 8873.52 64 5 S 1.10 E 26.67 8038.37S 42.20W 13248 8969.99 8884.57 68 35 S 2.90 E 17.39 8063.58S 41.31W 13280 8980.68 8895.26 72 54 S 4.10 E 13.70 8094.15S 39.44W 13312 8989.88 8904.46 73 48 S 4.20 E 2.82 8124.82S 37.21W 13344 8998.58 8913.16 74 30 S 4.60 E 2.51 8155.37S 34.86W 8037.65 8062.87 8093.46 8124.15 8154.72 13376 9007.06 8921.64 74 24 S 6.10 E 4.58 8185.72S 32.02W 13411 9016.48 8931.06 74 30 S 6.00 E .39 8219.36S 28.45W 13440 9024.32 8938.90 74 18 S 7.10 E 3.69 8247.28S 25.25W 13470 9032.08 8946.66 76 11 S 7.20 E 6.25 8276.51S 21.58W 13502 9039.13 8953.71 77 35 S 7.40 E 4.54 8306.57S 17.73W 8185.09 8218.77 8246.72 8275.97 8306.07 13535 9045.75 8960.33 79 41 S 7.80 E 6.35 8339.26S 13.37W 13566 9050.90 8965.48 81 11 S 8.30 E 5.09 8369.54S 9~09W 13598 9055.14 8969.72 83 30 S 9.10 E 7.62 8400.79S 4.30W 13630 9058.16 8972.74 85 35 S 9.20 E 6.63 8431.96S .72E 13663 9060.25 8974.83 87 5 S 9.60 E 4.73 8464.29S 6.07E 8338.80 8369.11 8400.41 8431.62 8464.00 13694 9061.48 8976.06 88 24 S 10.00 E 4.33 8495.19S ll.41E 13725 9061.56 8976.14 91 18 S 10.80 E 9.78 8525.43S 16.96E 13757 9060.01 8974.59 94 11 S 11.60 E 9.34 8557.00S 23.21E 13787 9057.58 8972.16 95 11 S 12.20 E 3.93 8585.90S 29.30E 13818 9054.57 8969.15 95 48 S 13.00 E 3.17 8616.44S 36.12E 8494.94 8525.23 8556.86 8585.81 8616.42 13856 9051.06 8965.64 94 48 S 13.50 E 2.94 8653.25S 44.79E 13888 9048.82 8963.40 93 11 S 13.60 E 4.98 8684.47S 52.32E 13920 9047.69 8962.27 90 54 S 14.00 E 7.40 8715.06S 59.83E 13930 9047.63 8962.21 89 48 S 14.40 E 11.78 8724.70S 62.27E 13980 9047.80 8962.38 89 48 S 14.40 E .04 8772.90S 74.65E 8653.30 8684.58 8715.24 8724.90 8773.22 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 8773.22 FEET AT SOUTH 0 DEG. 29 MIN. EAST AT MD = 13980 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 179.48 DEG. TIE IN POINT 13149.27' WINDOW POINT 13200' INTERPOLATED DEPTH 13980' SPEk~.f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 ST 500292254271 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 020195 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -85.42 .00 N .00 E 1000 998.80 913.38 9.44 N 27.92 W 2000 1994.64 1909.22 26.85 N 98.69 W 3000 2990.92 2905.50 55.47 S 95.44 W 4000 3932.61 3847.19 360.89 S 89.21 W .00 1.20 1.20 5.36 4.16 9.08 3.72 67.39 58.32 5000 4671.65 4586.23 1029.76 S 121.84 W 6000 5193.62 5108.20 1880.91 S 87.55 W 7000 5711.94 5626.52 2734.94 S 44.64 W 8000 6230.09 6144.67 3589.82 S 26.59 W 9000 6747.92 6662.50 4444.53 S 58.79 W 328.35 260.96 806.38 478.03 1288.06 481.68 1769.91 481.85 2252.08 482.17 10000 7270.35 7184.93 5296.72 S 72.52 W 11000 7797.47 7712.05 6146.20 S 52.82 W 12000 8328.58 8243.16 6993.32 S 37.31 W 13000 8845.51 8760.09 7849.26 S 40.29 W 13980 9047.80 8962.38 8772.90 S 74.65 E 2729.65 477.56 3202.53 472.88 3671.42 468.90 4154.49 483.07 4932.20 777.70 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPE~..f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING DBU/A-42 ST 500292254271 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 020195 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -85.42 .00 N .00 E .00 85 85.42 .00 .00 S .02 E .00 185 185.42 100.00 .04 N .09 E .00 285 285.42 200.00 .18 N .23 E .00 385 385.42 300.00 .33 N .44 E .00 .00 .00 .00 .00 485 485.42 400.00 .62 N .41 E .00 585 585.42 500.00 1.29 N .77 W .01 685 685.42 600.00 2.26 N 3.59 W .06 785 785.42 700.00 3.48 N 8.45 W .20 885 885.42 800.00 5.61 N 16.28 W .54 986 985.42 900.00 8.92 N 26.44 W 1.11 1087 1085.42 1000.00 12.84 N 37.69 W 1.82 1187 1185.42 1100.00 17.48 N 48.45 W 2.51 1288 1285.42 1200.00 23.62 N 57.52 W 3.11 1389 1385.42 1300.00 30.49 N 65.78 W 3.69 .00 .01 .05 .14 .34 .57 .71 .69 .60 .57 1489 1485.42 1400.00 36.39 N 73.67 W 4.18 1589 1585.42 1500.00 39.58 N 80.89 W 4.50 1690 1685.42 1600.00 39.69 N 87.59 W 4.74 1790 1785.42 1700.00 37.28 N 94.25 W 4.99 1890 1885.42 1800.00 33.07 N 98.30 W 5.18 .49 .32 .24 .25 .19 1990 1985.42 1900.00 27.38 N 98.70 W 5.34 2090 2085.42 2000.00 21.64 N 98.55 W 5.51 2191 2185.42 2100.00 15.96 N 98.32 W 5.67 2291 2285.42 2200.00 10.22 N 98.11 W 5.83 2391 2385.42 2300.00 4.32 N 98.13 W 6.01 .16 .16 .16 .16 .17 2491 2485.42 2400.00 2.60 S 98.32 W 6.25 2592 2585.42 2500.00 11.38 S 98.69 W 6.64 2692 2685.42 2600.00 21.31 S 98.80 W 7.13 2793 2785.42 2700.00 31.79 S 98.09 W 7.69 2893 2885.42 2800.00 42.67 S 97.13 W 8.28 .25 .39 .49 .55 .59 2994 2985.42 2900.00 54.73 S 95.56 W 9.03 3095 3085.42 3000.00 68.36 S 93.16 W 9.98 3196 3185.42 3100.00 83.17 S 90.77 W 11.10 3298 3285.42 3200.00 100.90 S 88.62 W 12.71 3400 3385.42 3300.00 122.61 S 86.62 W 15.07 .75 .95 1.12 1.60 2.36 SPEk~Cf-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 ST 500292254271 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 020195 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE MEASD VERTICAL DEPTH DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 3504 3485.42 3610 3585.42 3718 3685.42 3830 3785.42 3944 3885.42 3400.00 149.82 S 85.46 W 18.73 3500.00 184.87 S 85.72 W 24.73 3600.00 227.17 S 85.74 W 33.32 3700.00 276.39 S 86.53 W 44.79 3800.00 332.06 S 88.16 W 59.27 3.66 5.99 8.59 11.47 14.48 4063 3985.42 4188 4085.42 4319 4185.42 4452 4285.42 4588 4385.42 3900.00 395.72 S 90.91 W 77.88 4000.00 470.18 S 95.35 W 102.66 4100.00 555.49 S 98.97 W 134.18 4200.00 643.32 S 102.67 W 167.34 4300.00 735.64 S 107.31 W 203.53 18.60 24.79 31.52 33.15 36.19 4726 4485.42 4868 4585.42 5022 4685.42 5196 4785.42 5388 4885.42 4400.00 830.25 S 113.17 W 241.32 4500.00 930.89 S 117.43 W 283.29 4600.00 1047.18 S 122.34 W 336.79 4700.00 1189.70 S 121.58 W 410.97 4800.00 1353.18 S 116.92 W 502.70 37.79 41.97 53.50 74.18 91.73 5584 4985.42 5782 5085.42 5983 5185.42 6184 5285.42 6375 5385.42 4900.00 1522.50 S 109.39 W 599.50 5000.00 1692.37 S 99.06 W 696.89 5100.00 1866.60 S 88.40 W 798.07 5200.00 2040.17 S 78.80 W 898.61 5300.00 2203.16 S 70.34 W 990.03 96.80 97.39 101.17 100.55 91.42 6567 5485.42 6758 5585.42 6949 5685.42 7140 5785.42 7335 5885.42 5400.00 2366.74 S 62.57 W 1081.91 5500.00 2529.70 S 54.06 W 1173.30 5600.00 2692.04 S 46.44 W 1264.12 5700.00 2854.25 S 39.00 W 1354.82 5800.00 3021.55 S 33.24 W 1449.81 91.88 91.38 90.82 90.70 95.00 7530 5985.42 7724 6085.42 7914 6185.42 8106 6285.42 8300 6385.42 5900.00 3189.50 S 28.27 W 1545.36 6000.00 3355.84 S 24.89 W 1639.48 6100.00 3517.36 S 25.96 W 1729.45 6200.00 3680.90 S 27.49 W 1821.15 6300.00 3847.00 S 30.09 W 1915.05 95.54 94.12 89.97 91.70 93.90 8491 6485.42 8684 6585.42 8880 6685.42 9072 6785.42 9263 6885.42 6400.00 4009.84 S 36.11 W 2006.24 6500.00 4174.87 S 44.99 W 2099.42 6600.00 4342.54 S 52.37 W 2194.79 6700.00 4505.98 S 62.29 W 2286.66 6800.00 4668.68 S 69.45 W 2377.78 91.19 93.18 95.37 91.86 91.12 SPEk~f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 ST 500292254271 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 020195 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD DIFFERENCE VERTICAL CORRECTION 9452 6985.42 6900.00 4829.37 S 76.08 W 2467.16 9644 7085.42 7000.00 4993.50 S 76.35 W 2559.38 9838 7185.42 7100.00 5158.82 S 73.46 W 2652.62 10029 7285.42 7200.00 5321.50 S 72.43 W 2743.58 10222 7385.42 7300.00 5487.43 S 70.46 W 2837.33 89.38 92.23 93.23 90.97 93.75 10412 7485.42 7400.00 5648.68 S 66.43 W 2927.13 10599 7585.42 7500.00 5806.71 S 62.28 W 3014.18 10788 7685.42 7600.00 5966.73 S 58.55 W 3102.93 10977 7785.42 7700.00 6126.85 S 53.50 W 3191.77 11167 7885.42 7800.00 6288.37 S 48.22 W 3281.82 89.80 87.06 88.74 88.85 90.05 11355 7985.42 7900.00 6447.32 S 44.79 W 3369.65 11542 8085.42 8000.00 6606.29 S 42.22 W 3457.47 11731 8185.42 8100.00 6765.68 S 40.29 W 3545.65 11918 8285.42 8200.00 6924.59 S 37.67 W 3633.42 12107 8385.42 8300.00 7085.12 S 36.82 W 3722.56 87.83 87.83 88.18 87.77 89.14 12298 8485.42 8400.00 7247.66 S 35.70 W 3813.41 12490 8585.42 8500.00 7411.37 S 35.44 W 3905.25 12687 8685.42 8600.00 7580.85 S 37.32 W 4002.04 12882 8785.42 8700.00 7748.85 S 39.41 W 4097.56 13077 8885.42 8800.00 7915.14 S 40.98 W 4191.61 90.85 91.84 96.79 95.52 94.05 13296 8985.42 8900.00 8109.66 S 38.32 W 4311.40 13980 9047.80 8962.38 8772.90 S 74.64 E 4932.20 119.78 620.80 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42PH 500292254280 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 012495 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -85.42 100 100.00 14.58 200 200.00 114.58 300 300.00 214.58 400 400.00 314.58 0 0 N .00 E .00 0 1 S 84.88 E .03 0 6 N 42.05 E .09 0 7 N 51.16 E .03 0 10 N 57.01 E .05 .00N .00E .00 .00S .03E .00 .06N .liE -.06 .20N .26E -.19 .35N .48E -.35 500 500.00 414.58 0 26 N 47.42 W .52 600 599.98 514.56 1 25 N 67.59 W 1.02 700 699.93 614.51 2 14 N 75.24 W .85 800 799.77 714.35 4 0 N 76.44 W 1.77 900 899.39 813.97 5 46 N 72.78 W 1.79 .70N .33E -.70 1.43N 1.10W -1.44 2.40N 4.14W -2.44 3.72N 9.43W -3.80 6.03N 17.63W -6.19 1000 998.80 913.38 6 41 N 70.67 W .95 1100 1098.09 1012.67 6 57 N 70.94 W .27 1200 1197.42 1112.00 6 19 N 59.00 W 1.52 1300 1296.82 1211.40 6 10 N 50.75 W .91 1400 1396.25 1310.83 6 4 N 49.46 W .17 9.44N 27.92W -9.70 13.35N 39.15W -13.70 18.16N 49.59W -18.61 24.40N 58.47W -24.93 31.23N 66.65W -31.84 1500 1495.78 1410.36 5 0 N 60.19 W 1.48 1600 1595.47 1510.05 3 53 N 77.85 W 1.76 1700 1695.24 1609.82 4 1 S 74.54 W 1.89 1800 1794.98 1709.56 4 7 S 63.77 W .77 1900 1894.81 1809.39 3 15 S 6.51 W 3.62 36.84N 74.46W -37.52 39.73N 81.56W -40.46 39.51N 88.26W -40.30 36.98N 94.87W -37.84 32.56N 98.42W -33.45 2000 1994.64 1909.22 3 18 S 1.10 E .44 2100 2094.48 2009.06 3 15 S 1.98 E .08 2200 2194.32 2108.90 3 15 S 2.85 E .05 2300 2294.15 2208.73 3 19 S .93 E .13 2400 2393.98 2308.56 3 27 S 1.72 W .20 26.85N 98.69W -27.74 21.13N 98.53W -22.02 15.46N 98.29W -16.35 9.71N 98.10W -10.60 3.80N 98.15W -4.69 2500 2493.72 2408.30 4 40 S 1.44 W 1.22 2600 2593.32 2507.90 5 31 S 3.50 W .87 2700 2692.83 2607.41 5 53 S 2.99 E .74 2800 2792.27 2706.85 6 9 S 5.02 E .34 2900 2891.68 2806.26 6 20 S 5.06 E .19 3.27S 98.34W 2.38 12.14S 98.74W 11.25 22.07S 98.76W 21.17 32.53S 98.03W 31.64 43.37S 97.07W 42.48 3000 2990.92 2905.50 7 41 S 9.87 E 1.48 3100 3089.97 3004.55 8 6 S 10.16 E .40 3200 3188.85 3103.43 9 2 S 8.08 E .99 3300 3287.26 3201.84 11 20 S 5.88 E 2.33 3400 3384.94 3299.52 13 16 S 4.74 E 1.96 55.47S 95.44W 54.60 69.00S 93.04W 68.15 83.71S 90.70W 82.89 101.27S 88.59W 100.46 122.50S 86.63W 121.71 RECEIVED Gas Corm. Commission Anchor~ ' Dat~_ . SPEk~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42PH 500292254280 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 012495 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS DIRECTION DEGREES DG/100 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERT. SECT. 3500 3481.46 3396.04 3600 3575.97 3490.55 3700 3668.34 3582.92 3800 3758.54 3673.12 3900 3846.68 3761.26 17 21 23 27 29 0 3 58 9 10 S .83 E 3.87 S 1.27 W 4.11 S .70 E 3.01 S 1.53 W 3.33 S 1.62 W 2.02 148.58S 85.47W 147.80 181.18S 85.65W 180.40 219.46S 85.80W 218.68 262.60S 86.17W 261.81 309.79S 87.46W 308.98 4000 3932.61 3847.19 4100 4015.44 3930.02 4200 4094.68 4009.26 4300 4170.76 4085.34 4400 4245.80 4160.38 32 19 35 47 39 20 41 34 41 9 S 2.27 W 3.17 S 3.77 W 3.57 S 2.93 W 3.58 S 2.00 W 2.32 S 2.55 W .56 360.89S 89.21W 360.06 416.81S 92.20W 415.95 477.67S 95.74W 476.78 542.48S 98.52W 541.57 608.52S 101.14W 607.58 4500 4320.31 4234.89 4600 4393.44 4308.02 4700 4466.00 4380.58 4800 4537.55 4452.13 4900 4606.56 4521.14 42 30 43 30 43 26 45 11 47 30 S 2.26 W 1.35 S 4.36 W 1.75 S 2.90 W 1.01 S 2.22 W 1.81 S 2.92 W 2.37 675.15S 103.94W 674.18 743.23S 107.89W 742.22 811.89S 112.24W 810.84 881.67S 115.36W 880.59 953.94S 118.61W 952.82 5000 4671.65 4586.23 51 15 5100 4731.72 4646.30 54 54 5200 4787.38 4701.96 57 26 5300 4840.40 4754.98 58 31 5350 4866.16 4780.74 59 26 S 1.98 W 3.81 S .55 E 4.18 S 1.20 E 2.59 S .82 E 1.13 S 3.51 E 4.96 1029.76S 121.84W 1028.61 1109.68S 122.79W 1108.52 1192.73S 121.51W 1191.58 1277.50S 120.02W 1276.36 1320.31S 118.40W 1319.18 5362 4872.27 4786.85 5458 4920.87 4835.45 5553 4969.35 4883.93 5655 5021.49 4936.07 5750 5069.54 4984.12 59 42 59 42 59 5 59 17 60 0 S 2.40 E 8.22 S 2.70 E .27 S 2.40 E .69 S 3.60 E 1.03 S 3.60 E .74 1330.69S 117.86W 1329.57 1413.78S 114.16W 1412.69 1495.67S l10.51W 1494.61 1583.01S 105.94W 1581.98 1664.91S 100.78W 1663.93 5846 5117.07 5031.65 5940 5163.98 5078.56 6035 5211.31 5125.89 6130 5258.42 5173.00 6224 5306.64 5221.22 6O 6O 60 59 58 24 0 24 54 30 S 3.40 E .46 S 3.60 E .46 S 3.20 E .56 S 3.10 E .54 S 3.10 E 1.49 1747.75S 95.72W 1746.81 1829.51S 90.72W 1828.62 1912.00S 85.82W 1911.14 1993.96S 81.31W 1993.14 2074.75S 76.93W 2073.96 6319 5356.25 5270.83 6415 5406.45 5321.03 6511 5456.15 5370.73 6606 5506.01 5420.59 6701 5555.75 5470.33 58 58 58 58 58 3O 35 35 24 35 S 2.90 E .18 S 2.50 E .37 S 2.90 E .36 S 2.90 E .21 S 3.10 E .28 2155.58S 72.69W 2154.84 2237.58S 68.83W 2236.86 2318.92S 64.99W 2318.23 2400.17S 60.88W 2399.52 2481.23S 56.63W 2480.61 SPERrY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42PH 500292254280 NORTH SLOPE COMPUTATION DATE: 3 / 1/9 DATE OF SURVEY: 012495 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6797 5605.53 5520.11 6893 5656.02 5570.60 6988 5706.07 5620.65 7083 5755.93 5670.51 7179 5805.61 5720.19 58 58 58 58 58 24 24 17 24 47 S 2.70 E .41 2562.36S 52.52W S 2.70 E .00 2644.33S 48.65W S 2.40 E .29 2725.45S 45.04W S 2.90 E .46 2806.24S 41.30W S 1.90 E .99 2887.57S 37.89W 2561.77 2643.78 2724.93 2805.75 2887.11 7274 5854.60 5769.18 7369 5902.90 5817.48 7465 5951.61 5866.19 7560 6000.85 5915.43 7656 6049.89 5964.47 59 59 59 58 59 24 35 0 54 12 S 2.00 E .64 2969.37S 35.11W S 2.20 E .28 3051.31S 32.10W S 1.30 E 1.03 3133.32S 29.59W S 1.50 E .21 3215.07S 27.60W S 1.10 E .48 3296.83S 25.74W 2968.93 3050.89 3132.92 3214.69 3296.46 7751 6099.15 6013.73 7845 6148.99 6063.57 7941 6199.43 6114.01 8036 6249.16 6163.74 8131 6298.42 6213.00 58 24 58 5 58 17 58 42 58 47 S .20 E 1.17 3378.15S 24.82W S .80 W .95 3458.70S 25.24W S .50 W .34 3540.05S 26.16W S .50 W .42 3621.19S 26.87W S .80 W .29 3702.36S 27.79W 3377.79 3458.33 3539.66 3620.80 3701.95 8226 6347.01 6261.59 59 12 8321 6396.27 6310.85 58 30 8416 6445.86 6360.44 58 24 8513 6496.83 6411.41 58 35 8608 6545.87 6460.45 58 54 S .80 W .42 3783.22S 28.92W S 1.50 W .97 3864.70S 30.55W S 2.20 W .64 3945.42S 33.16W S 3.40 W 1.07 4028.49S 37.22W S 2.90 W .55 4109.19S 41.66W 3782.80 3864.27 3944.96 4027.99 4108.64 8700 6593.20 6507.78 8797 6643.20 '6557.78 8894 6693.02 6607.60 8988 6742.16 6656.74 9085 6792.25 6706.83 59 5 59 30 58 35 58 30 58 47 S 2.90 W .22 4187.86S 45.65W S 1.90 W .97 4271.99S 49.17W S 3.60 W 1.77 4354.97S 53.15W S 3.60 W .11 4435.15S 58.20W S 2.90 W .69 4517.25S 62.86W 4187.28 4271.37 4354.31 4434.44 4516.49 9179 6841.59 6756.17 9273 6890.89 6805.47 9368 6941.28 6855.86 9463 6991.25 6905.83 9556 7039.91 6954.49 58 58 58 58 58 24 0 5 24 42 S 2.40 W .62 4597.98S 66.59W S 2.20 W .46 4677.42S 69.79W S 2.60 W .37 4758.16S 73.17W S 2.00 W .62 4838.85S 76.41W S .60 E 2.40 4918.38S 77.38W 4597.19 4676.60 4757.30 4837.96 4917.48 9650 7088.37 7002.95 9746 7137.65 7052.23 9841 7187.14 7101.72 9936 7236.94 7151.52 10030 7286.26 7200.84 58 59 58 58 58 54 0 24 17 42 S 1.00 E .42 4998.38S 76.26W S 1.00 E .10 5080.22S 74.83W S 1.00 E .63 5161.61S 73.41W S .10 E .81 5242.39S 72.64W S .20 E .43 5322.87S 72.43W 4997.49 5079.33 5160.73 5241.52 5322.00 SPEk~iY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42PH 500292254280 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 012495 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10125 7335.34 7249.92 10220 7384.34 7298.92 10315 7433.74 7348.32 10408 7483.18 7397.76 10500 7532.53 7447.11 58 59 58 57 57 54 12 5 30 42 S .60 E .42 5403.92S 71.86W S 1.30 E .70 5485.62S 70.50W S 1.30 E 1.16 5566.69S 68.66W S 1.80 E .79 5645.16S 66.54W S 1.60 E .28 5722.90S 64.23W 5403.04 5484.75 5565.83 5644.32 5722.08 10593 7582.19 7496.77 10689 7632.88 7547.46 10784 7683.63 7598.21 10880 7733.99 7648.57 10974 7784.21 7698.79 57 58 58 58 58 47 5 0 0 5 S 1.10 E .47 5801.58S 62.38W S 1.30 E .36 5882.53S 60.68W S 1.60 E .29 5963.87S 58.63W S 1.80 E .18 6044.44S 56.23W S 2.00 E .21 6124.91S 53.56W 5800.78 5881.73 5963.10 6043.68 6124.17 11070 7834.45 7749.03 11161 7882.52 7797.10 11257 7932.98 7847.56 11352 7983.87 7898.45 11447 8034.69 7949.27 58 17 58 17 57 47 57 30 57 54 S 2.40 E .41 6205.88S 50.45W S .80 E 1.49 6283.68S 48.28W S 1.50 E .81 6364.56S 46.66W S 1.10 E .48 6444.88S 44.84W S .80 E .50 6525.26S 43.50W 6205.16 6282.98 6363.88 6444.21 6524.60 11538 8083.02 7997.60 11633 8133.67 8048.25 11729 8184.33 8098.91 11822 8234.09 8148.67 11916 8283.94 8198.52 58 0 57 47 58 0 57 47 57 42 S 1.00 E .22 6602.45S 42.29W S .40 E .57 6683.19S 41.30W S 1.00 E .57 6763.93S 40.32W S 1.10 E .23 6843.25S 38.86W S .60 E .46 6922.25S 37.69W 6601.80 6682.54 6763.29 6842.61 6921.62 12012 8335.38 8249.96 12105 8384.07 8298.65 12200 8433.79 8348.37 12291 8481.54 8396.12 12385 8530.87 8445.45 58 5 58 24 58 24 58 24 58 2.4 S .10 W .74 7004.24S 37.33W S .80 E .89 7082.92S 36.85W S .20 E .54 7163.74S 36.15W S .40 E .19 7241.36S 35.74W S .20 E .18 7321.53S 35.32W 7003.62 7082.29 7163.11 7240.74 7320.91 12479 8579.46 8494.04 12572 8627.09 8541.67 12666 8674.57 8589.15 12760 8722.64 8637.22 12854 8770.77 8685.35 59 0 59 35 59 30 59 12 59 12 S .30 W .79 7401.45S 35.39W S 1.00 W .91 7481.67S 36.30W S .30 W .65 7562.42S 37.22W S 1.00 W .71 7643.54S 38.14W S .50 W .46 7724.26S 39.20W 7400.82 7481.03 7561.77 7642.88 7723.59 12949 8819.35 8733.93 13042 8867.26 8781.84 13111 8903.47 8818.05 13149 8922.96 8837.54 13225 8962.21 8876.79 59 5 58 47 58 35 58 54 59 0 S .50 W .11 7805.60S 39.91W S .60 W .34 7885.18S 40.67W S .60 W .29 7944.73S 41.29W S .50 W .83 7976.85S 41.60W S 1.40 W 1.02 8042.02S 42.68W 7804.91 7884.49 7944.02 7976.14 8041.30 SPEk~{Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHA~RED SERVICES DRILLING PBU/A-42PH 500292254280 NORTH SLOPE COMPUTATION DATE: 3/ 1/9 DATE OF SURVEY: 012495 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 13255 8978.00 8892.58 58 35 13288 8994.92 8909.50 58 0 13320 9012.26 8926.84 57 12 13351 9029.34 8943.92 56 47 13383 9046.83 8961.41 56 47 S 1.30 W 1.34 8068.09S 43.30W S 1.30 W 1.86 8095.47S 43.92W S .20 W 3.79 8122.81S 44.28W S 1.00 W 2.49 8149.10S 44.55W S .50 W 1.31 8175.83S 44.90W 8067.37 8094.74 8122.07 8148.36 8175.08 13415 9064.30 8978.88 56 42 S .40 W .41 8202.47S 45.11W 13447 9081.77 8996.35 56 42 S .10 E 1.31 8229.07S 45.18W 13479 9099.35 9013.93 56 35 S .20 E .41 8255.78S 45.11W 13511 9116.95 9031.53 56 42 S .60 W 2.11 8282.51S 45.20W 13543 9134.55 9049.13 56 42 S .40 W .52 8309.30S 45.44W 8201.72 8228.32 8255.03 8281.76 8308.55 13575 9152.17 9066.75 56 42 S .30 W .26 8336.13S 13610 9171.10 9085.68 56 42 S .30 W .00 8364.94S 45.60W 8335.37 45.75W 8364.18 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 8365.07 FEET AT SOUTH 0 DEG. 18 MIN. WEST AT MD = 13610 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 179.48 DEG. SPEk~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42PH 500292254280 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 012495 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -85.42 .00 N .00 E 1000 998.80 913.38 9.44 N 27.92 W 2000 1994.64 1909.22 26.85 N 98.69 W 3000 2990.92 2905.50 55.47 S 95.44 W 4000 3932.61 3847.19 360.89 S 89.21 W .0O 1.20 1.20 5.36 4.16 9.08 3.72 67.39 58.32 5000 4671.65 4586.23 1029.76 S 121.84 W 6000 5193.62 5108.20 1880.91 S 87.55 W 7000 5711.94 5626.52 2734.94 S 44.64 W 8000 6230.09 6144.67 3589.82 S 26.59 W 9000 6747.92 6662.50 4444.53 S 58.79 W 328.35 260.96 806.38 478.03 1288.06 481.68 1769.91 481.85 2252.08 482.17 10000 7270.35 7184.93 5296.72 S 72.52 W 11000 7797.47 7712.05 6146.20 S 52.82 W 12000 8328.58 8243.16 6993.32 S 37.31 W 13000 8845.51 8760.09 7849.26 S 40.29 W 13610 9171.10 9085.68 8364.94 S 45.75 W 2729.65 477.56 3202.53 472.88 3671.42 468.90 4154.49 483.07 4438.90 284.41 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42PH 500292254280 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 012495 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 -85.42 85 85.42 .00 185 185.42 100.00 285 285.42 200.00 385 385.42 300.00 .00 N .00 E .00 .00 S .02 E .00 .04 N .09 E .00 .18 N .23 E .00 .33 N .44 E .00 .00 .00 .00 .00 485 485.42 400.00 585 585.42 500.00 685 685.42 600.00 785 785.42 700.00 885 885.42 800.00 .62 N .41 E .00 .29 N .77 W .01 .26 N 3.59 W .06 .48 N 8.45 W .20 .61 N 16.28 W .54 .00 .01 .05 .14 .34 986 985.42 900.00 1087 1085.42 1000.00 1187 1185.42 1100.00 1288 1285.42 1200.00 1389 1385.42- 1300.00 8 12 17 23 30 .92 N 26.44 W 1.11 .84 N 37.69 W 1.82 .48 N 48.45 W 2.51 .62 N 57.52 W 3.11 .49 N 65.78 W 3.69 .57 .71 .69 .60 .57 1489 1485.42 1400.00 1589 1585.42 1500.00 1690 1685.42 1600.00 1790 1785.42 1700.00 1890 1885.42 1800.00 36 39 39 37 33 .39 N 73.67 W 4.18 .58 N 80.89 W 4.50 .69 N 87.59 W 4.74 .28 N 94.25 W 4.99 .07 N 98.30 W 5.18 .49 .32 .24 .25 .19 1990 1985.42 1900.00 2090 2085.42 2000.00 2191 2185.42 2100.00 2291 2285.42 2200.00 2391 2385.42 2300.00 27 21 15 10 4 .38 N 98.70 W 5.34 .64 N 98.55 W 5.51 .96 N 98.32 W 5.67 .22 N 98.11 W 5.83 .32 N 98.13 W 6.01 .16 .16 .16 .16 .17 2491 2485.42 2400.00 2592 2585.42 2500.00 2692 2685.42 2600.00 2793 2785.42 2700.00 2893 2885.42 2800.00 2 11 21 31 42 .60 S 98.32 W 6.25 .38 S 98.69 W 6.64 .31 S 98.80 W 7.13 .79 S 98.09 W 7.69 .67 S 97.13 W 8.28 .25 .39 .49 .55 .59 2994 2985.42 2900.00 3095 3085.42 3000.00 3196 3185.42 3100.00 3298 3285.42 3200.00 3400 3385.42 3300.00 54.73 S 95.56 W 9.03 .75 68.36 S 93.16 W 9.98 .95 83.17 S 90.77 W 11.10 1.12 100.90 S 88.62 W 12.71 1.60 122.61 S 86.62 W 15.07 2.36 SPER~f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42PH 5oo29225428o NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 012495 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3504 3485.42 3400.00 3610 3585.42 3500.00 3718 3685.42 3600.00 3830 3785.42 3700.00 3944 3885.42 3800.00 149.82 S 85.46 W 184.87 S 85.72 W 227.17 S 85.74 W 276.39 S 86.53 W 332.06 S 88.16 W 18.73 3.66 24.73 5.99 33.32 8.59 44.79 11.47 59.27 14.48 4063 3985.42 3900.00 4188 4085.42 4000.00 4319 4185.42 4100.00 4452 4285.42 4200.00 4588 4385.42 4300.00 395.72 S 90.91 W 77.88 18.60 470.18 S 95.35 W 102.66 24.79 555.49 S 98.97 W 134.18 31.52 643.32 S 102.67 W 167.34 33.15 735.64 S 107.31 W 203.53 36.19 4726 4485.42 4400.00 4868 4585.42 4500.00 5022 4685.42 4600.00 5196 4785.42 4700.00 5388 4885.42 4800.00 830.25 S 113.17 W 241.32 37.79 930.89 S 117.43 W 283.29 41.97 1047.18 S 122.34 W 336.79 53.50 1189.70 S 121.58 W 410.97 74.18 1353.18 S 116.92 W 502.70 91.73 5584 4985.42 4900.00 5782 5085.42 5000.00 5983 5185.42 5100.00 6184 5285.42 5200.00 6375 5385.42 5300.00 1522.50 S 109.39 W 599.50 96.80 1692.37 S 99.06 W 696.89 97.39 1866.60 S 88.40 W 798.07 101.17 2040.17 S 78.80 W 898.61 100.55 2203.16 S 70.34 W 990.03 91.42 6567 5485.42 5400.00 6758 5585.42 5500.00 6949 5685.42 5600.00 7140 5785.42 5700.00 7335 5885.42 5800.00 2366.74 S 62.57 W 1081.91 91.88 2529.70 S 54.06 W 1173.30 91.38 2692.04 S 46.44 W 1264.12 90.82 2854.25 S 39.00 W 1354.82 90.70 3021.55 S 33.24 W 1449.81 95.00 7530 5985.42 5900.00 7724 6085.42 6000.00 7914 6185.42 6100.00 8106 6285.42 6200.00 8300 6385.42 6300.00 3189.50 S 28.27 W 1545.36 95.54 3355.84 S 24.89 W 1639.48 94.12 3517.36 S 25.96 W 1729.45 89.97 3680.90 S 27.49 W 1821.15 91.70 3847.00 S 30.09 W 1915.05 93.90 8491 6485.42 6400.00 8684 6585.42 6500.00 8880 6685.42 6600.00 9072 6785.42 6700.00 9263 6885.42 6800.00 4009.84 S 36.11 W 2006.24 91.19 4174.87 S 44.99 W 2099.42 93.18 4342.54 S 52.37 W 2194.79 95.37 4505.98 S 62.29 W 2286.66 91.86 4668.68 S 69.45 W 2377.78 91.12 SPER~f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42PH 500292254280 NORTH SLOPE COMPUTATION DATE: 3/ 1/95 DATE OF SURVEY: 012495 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 9452 6985.42 6900.00 4829.37 S 76.08 W 2467.16 9644 7085.42 7000.00 4993.50 S 76.35 W 2559.38 9838 7185.42 7100.00 5158.82 S 73.46 W 2652.62 10029 7285.42 7200.00 5321.50 S 72.43 W 2743.58 10222 7385.42 7300.00 5487.43 S 70.46 W 2837.33 89.38 92.23 93.23 90.97 93.75 10412 7485.42 7400.00 5648.68 S 66.43 W 2927.13 10599 7585.42 7500.00 5806.71 S 62.28 W 3014.18 10788 7685.42 7600.00 5966.73 S 58.55 W 3102.93 10977 7785.42 7700.00 6126.85 S 53.50 W 3191.77 11167 7885.42 7800.00 6288.37 S 48.22 W 3281.82 89.80 87.06 88.74 88.85 90.05 11355 7985.42 7900.00 6447.32 S 44.79 W 3369.65 11542 8085.42 8000.00 6606.29 S 42.22 W 3457.47 11731 8185.42 8100.00 6765.68 S 40.29 W 3545.65 11918 8285.42 8200.00 6924.59 S 37.67 W 3633.42 12107 8385.42 8300.00 7085.12 S 36.82 W 3722.56 87.83 87.83 88.18 87.77 89.14 12298 8485.42 8400.00 7247.66 S 35.70 W 3813.41 12490 8585.42 8500.00 7411.37 S 35.44 W 3905.25 12687 8685.42 8600.00 7580.85 S 37.32 W 4002.04 12882 8785.42 8700.00 7748.85 S 39.41 W 4097.56 13077 8885.42 8800.00 7915.14 S 40.98 W 4191.61 90.85 91.84 96.79 95.52 94.05 13270 8985.42 8900.00 8080.16 S 43.57 W 4284.59 13454 9085.42 9000.00 8234.62 S 45.17 W 4368.61 13610 9171.10 9085.68 8364.94 S 45.75 W 4438.90 92.98 84.02 70.29 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPEk~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 500292254200 NORTH SLOPE COMPUTATION DATE: 2/28/95 DATE OF SURVEY: 013195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -85.42 100 100.00 14.58 200 200.00 114.58 300 300.00 214.58 400 400.00 314.58 0 0 N .00 E .00 0 1 S 84.88 E .03 0 6 N 42.05 E .09 0 7 N 51.16 E .03 0 10 N 57.01 E .05 .00N .00E .00 .00S .03E .00 .06N .liE -.06 .20N .26E -.19 .35N .48E -.35 500 500.00 414.58 600 599.98 514.56 700 699.93 614.51 800 799.77 714.35 900 899.39 813.97 0 26 N 47.42 W .52 1 25 N 67.59 W 1.02 2 14 N.75.24 W .85 4 0 N 76.44 W 1.77 5 46 N 72.78 W 1.79 .70N .33E -.70 1.43N 1.10W -1.44 2.40N 4.14W -2.44 3.72N 9.43W -3.80 6.03N 17.63W -6.19 1000 998.80 913.38 1100 1098.09 1012.67 1200 1197.42 1112.00 1300 1296.82 1211.40 1400 1396.25 1310.83 6 41 N 70.67 W .95 6 57- N 70.94 W .27 6 19 N 59.00 W 1.52 6 10 N 50.75 W .91 6 4 N 49.46 W .17 9.44N 27.92W -9.70 13.35N 39.15W -13.70 18.16N 49.59W -18.61 24.40N 58.47W -24.93 31.23N 66.65W -31.84 1500 1495.78 1410.36 1600 1595.47 1510.05 1700 1695.24 1609.82 1800 1794.98 1709.56 1900 1894.81 1809.39 5 0 N 60.19 W 1.48 3 53 N 77.85 W 1.76 4 1 S 74.54 W 1.89 4 7 S 63 . 77 W . 77 3 15 S 6.51 W 3.62 36.84N 74.46W -37.52 39.73N 81.56W -40.46 39.51N 88.26W -40.30 36.98N 94.87W -37.84 32.56N 98.42W -33.45 2000 1994.64 1909.22 2100 2094.48 2009.06 2200 2194.32 2108.90 2300 2294.15 2208.73 2400 2393.98 2308.56 3 18 S 1.10 E .44 3 15 S 1.98 E .08 3 15 S 2.85 E .05 3 19 S .93 E .13 3 27 S 1.72 W .20 26.85N 98.69W -27.74 21.13N 98.53W -22.02 15.46N 98.29W -16.35 9.71N 98.10W -10.60 3.80N 98.15W -4.69 2500 2493.72 2408.30 2600 2593.32 2507.90 2700 2692.83 2607.41 2800 2792.27 2706.85 2900 2891.68 2806.26 3000 2990.92 2905.50 3100 3089.97 3004.55 3200 3188.85 3103.43 3300 3287.26 3201.84 3400 3384.94 3299.52 4 40 S 1.44 W 1.22 5 31 S 3.50 W .87 5 53 S 2.99 E .74 6 9 S 5.02 E .34 6 20 S 5.06 E .19 7 41 S 9.87 E 1.48 8 6 S 10.16 E .40 9 2 S 8.08 E .99 11 20 S 5.88 E 2.33 13 16 S 4.74 E 1.96 3.27S 98.34W 2.38 12.14S 98.74W 11.25 22.07S 98.76W 21.17 32.53S 98.03W 31.64 43.37S 97.07W 42.48 55.47S 95.44W 54.60 69.00S 93.04W 68.15 83.71S 90.70W 82.89 101.27S 88.59W 100.46 122.50S 86.63W 121.71 Gas Gons. Commission Anchor~ Date SPEk~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 500292254200 NORTH SLOPE COMPUTATION DATE: 2/28/9 DATE OF SURVEY: 013195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3500 3481.46 3396.04 3600 3575.97 3490.55 3700 3668.34 3582.92 3800 3758.54 3673.12 3900 3846.68 3761.26 17 0 21 3 23 58 27 9 29 10 S .83 E 3.87 148.58S 85.47W S 1.27 W 4.11 181.18S 85.65W S .70 E 3.01 219.46S 85.80W S 1.53 W 3.33 262.60S 86.17W S 1.62 W 2.02 309.79S 87.46W 147.80 180.40 218.68 261.81 308.98 4000 3932.61 3847.19 4100 4015.44 3930.02 4200 4094.68 4009.26 4300 4170.76 4085.34 4400 4245.80 4160.38 32 19 35 47 39 20 41 34 41 9 S 2.27 W 3.17 360.89S 89.21W S 3.77 W 3.57 416.81S 92.20W S 2.93 W 3.58 477.67S 95.74W S 2.00 W 2.32 542.48S 98.52W S 2.55 W .56 608.52S 101.14W 360.06 415.95 476.78 541.57 607.58 4500 4320.31 4234.89 4600 4393.44 4308.02 4700 4466.00 4380.58 4800 4537.55 4452.13 4900 4606.56 4521.14 42 43 43 45 47 30 30 26 11 30 S 2.26 W 1.35 675.15S 103.94W S 4.36 W 1.75 743.23S 107.89W S 2.90 W 1.01 811.89S 112.24W S 2.22 W 1.81 881.67S 115.36W S 2.92 W 2.37 953.94S 118.61W 674.18 742.22 810.84 880.59 952.82 5000 4671.65 4586.23 5100 4731.72 4646.30 5200 4787.38 4701.96 5300 4840.40 4754.98 5350 4866.16 4780.74 51 15 54 54 57 26 58 31 59 26 S 1.98 W 3.81 1029.76S 121.84W S .55 E 4.18 1109.68S 122.79W S 1.20 E 2.59 1192.73S 121.51W S .82 E 1.13 1277.50S 120.02W S 3.51 E 4.96 1320.31S 118.40W 1028.61 1108.52 1191.58 1276.36 1319.18 5362 4872.27 4786.85 5458 4920.87 4835.45 5553 4969.35 4883.93 5655 5021.49 4936.07 5750 5069.54 4984.12 59 42 59 42 59 5 59 17 60 0 S 2.40 E 8.22 1330.69S 117.86W S 2.70 E .27 1413.78S 114.16W S 2.40 E .69 1495.67S l10.51W S 3.60 E 1.03 1583.01S 105.94W S 3.60 E .74 1664.91S 100.78W 1329.57 1412.69 1494.61 1581.98 1663.93 5846 5117.07 5031.65 5940 5163.98 5078.56 6035 5211.31 5125.89 6130 5258.42 5173.00 6224 5306.64 5221.22 60 24 60 0 60 24 59 54 58 30 S 3.40 E .46 1747.75S 95.72W S 3.60 E .46 1829.51S 90.72W S 3.20 E .56 1912.00S 85.82W S 3.10 E .54 1993.96S 81.31W S 3.10 E 1.49 2074.75S 76.93W 1746.81 1828.62 1911.14 1993.14 2073.96 6319 5356.25 5270.83 6415 5406.45 5321.03 6511 5456.15 5370.73 6606 5506.01 5420.59 6701 5555.75 5470.33 58 58 58 58 58 30 35 35 24 35 S 2.90 E .18 2155.58S 72.69W S 2.50 E .37 2237.58S 68.83W S 2.90 E .36 2318.92S 64.99W S 2.90 E .21 2400.17S 60.88W S 3.10 E .28 2481.23S 56.63W 2154.84 2236.86 2318.23 2399.52 2480.61 SPEkrcY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 500292254200 NORTH SLOPE COMPUTATION DATE: 2/28/95 DATE OF SURVEY: 013195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6797 5605.53 5520.11 6893 5656.02 5570.60 6988 5706.07 5620.65 7083 5755.93 5670.51 7179 5805.61 5720.19 58 24 58 24 58 17 58 24 58 47 S 2.70 E .41 2562.365 52.52W S 2.70 E .00 2644.335 48.65W S 2.40 E .29 2725.455 45.04W S 2.90 E .46 2806.245 41.30W S 1.90 E .99 2887.575 37.89W 2561.77 2643.78 2724.93 2805.75 2887.11 7274 5854.60 5769.18 7369 5902.90 5817.48 7465 5951.61 5866.19 7560 6000.85 5915.43 7656 6049.89 5964.47 59 24 59 35 59 0 58 54 59 12 S 2.00 E .64 2969.375 35.11W S 2.20 E .28 3051.315 32.10W S 1.30 E 1.03 3133.325 29.59W S 1.50 E .21 3215.075 27.60W S 1.10 E .48 3296.835 25.74W 2968.93 3050.89 3132.92 3214.69 3296.46 7751 6099.15 6013.73 7845 6148.99 6063.57 7941 6199.43 6114.01 8036 6249.16 6163.74 8131 6298.42 6213.00 58 24 58 5 58 17 58 42 58 47 S .20 E 1.17 3378.155 24.82W S .80 W .95 3458.705 25.24W S .50 W .34 3540.055 26.16W S .50 W .42 3621.195 26.87W S .80 W .29 3702.365 27.79W 3377.79 3458.33 3539.66 3620.80 3701.95 8226 6347.01 6261.59 8321 6396.27 6310.85 8416 6445.86 6360.44 8513 6496.83 6411.41 8608 6545.87 6460.45 59 12 58 30 58 24 58 35 58 54 S .80 W .42 3783.225 28.92W S 1.50 W .97 3864.705 30.55W S 2.20 W .64 3945.425 33.16W S 3.40 W 1.07 4028.495 37.22W S 2.90 W .55 4109.195 41.66W 3782.80 3864.27 3944.96 4027.99 4108.64 8700 6593.20 6507.78 8797 6643.20 6557.78 8894 6693.02 6607.60 8988 6742.16 6656.74 9085 6792.25 6706.83 59 5 59 30 58 35 58 30 58 47 S 2.90 W .22 4187.865 45.65W S 1.90 W .97 4271.995 49.17W S 3.60 W 1.77 4354.975 53.15W S 3.60 W .11 4435.155 58.20W S 2.90 W .69 4517.255 62.86W 4187.28 4271.37 4354.31 4434.44 4516.49 9179 6841.59 6756.17 9273 6890.89 6805.47 9368 6941.28 6855.86 9463 6991.25 6905.83 9556 7039.91 6954.49 58 24 58 0 58 5 58 24 58 42 S 2.40 W .62 4597.985 66.59W S 2.20 W .46 4677.425 69.79W S 2.60 W .37 4758.165 73.17W S 2.00 W .62 4838.855 76.41W S .60 E 2.40 4918.385 77.38W 4597.19 4676.60 4757.30 4837.96 4917.48 9650 7088.37 7002.95 9746 7137.65 7052.23 9841 7187.14 7101.72 9936 7236.94 7151.52 10030 7286.26 7200.84 58 59 58 58 58 54 0 24 17 42 S 1.00 E .42 4998.385 76.26W S 1.00 E .10 5080.225 74.83W S 1.00 E .63 5161.615 73.41W S .10 E .81 5242.395 72.64W S .20 E .43 5322.875 72.43W 4997.49 5079.33 5160.73 5241.52 5322.00 S~Ek~f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 500292254200 NORTH SLOPE COMPUTATION DATE: 2/28/95 DATE OF SURVEY: 013195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10125 7335.34 7249.92 10220 7384.34 7298.92 10315 7433.74 7348.32 10408 7483.18 7397.76 10500 7532.53 7447.11 58 54 59 12 58 5 57 30 57 42 S .60 E .42 5403.92S 71.86W S 1.30 E .70 5485.62S 70.50W S 1.30 E 1.16 5566.69S 68.66W S 1.80 E .79 5645.16S 66.54W S 1.60 E .28 5722.90S 64.23W 5403.04 5484.75 5565.83 5644.32 5722.08 10593 7582.19 7496.77 10689 7632.88 7547.46 10784 7683.63 7598.21 10880 7733.99 7648.57 10974 7784.21 7698.79 57 58 58 58 58 47 5 0 0 5 S 1.10 E .47 5801.58S 62.38W S 1.30 E .36 5882.53S 60.68W S 1.60 E .29 5963.87S 58.63W S 1.80 E .18 6044.44S 56.23W S 2.00 E .21 6124.91S 53.56W 5800.78 5881.73 5963.10 6043.68 6124.17 11070 7834.45 7749.03 11161 7882.52 7797.10 11257 7932.98 7847.56 11352 7983.87 7898.45 11447 8034.69 7949.27 58 17 58 17 57 47 57 30 57 54 S 2.40 E .41 6205.88S 50.45W S .80 E 1.49 6~83.68S 48.28W S 1.50 E .81 6364.56S 46.66W S 1.10 E .48 6444.88S 44.84W S .80 E .50 6525.26S 43.50W 6205.16 6282.98 6363.88 6444.21 6524.60 11538 8083.02 7997.60 11633 8133.67 8048.25 11729 8184.33 8098.91 11822 8234.09 8148.67 11916 8283.94 8198.52 58 0 57 47 58 0 57 47 57 42 S 1.00 E .22 6602.45S 42.29W S .40 E .57 6683.19S 41.30W S 1.00 E .57 6763.93S 40.32W S 1.10 E .23 6843.25S 38.86W S .60 E .46 6922.25S 37.69W 6601.80 6682.54 6763.29 6842.61 6921.62 12012 8335.38 8249.96 12105 8384.07 8298.65 12200 8433.79 8348.37 12291 8481.54 8396.12 12385 8530.87 8445.45 58 5 58 24 58 24 58 24 58 24 S .10 W .74 7004.24S 37.33W S .80 E .89 7082.92S 36.85W S .20 E .54 7163.74S 36.15W S .40 E .19 7241.36S 35.74W S .20 E .18 7321.53S 35.32W 7003.62 7082.29 7163.11 7240.74 7320.91 12479 8579.46 8494.04 12572 8627.09 8541.67 12666 8674.57 8589.15 12760 8722.64 8637.22 12854 8770.77 8685.35 59 0 59 35 59 30 59 12 59 12 S .30 W .79 7401.45S 35.39W S 1.00 W .91 7481.67S 36.30W S .30 W .65 7562.42S 37.22W S 1.00 W .71 7643.54S 38.14W S .50 W .46 7724.26S 39.20W 7400.82 7481.03 7561.77 7642.88 7723.59 12949 8819.35 8733.93 13042 8867.26 8781.84 13111 8903.47 8818.05 13149 8922.96 8837.54 13200 8949.14 8863.72 59 5 58 47 58 35 58 54 58 58 S .50 W .11 7805.60S 39.91W S .60 W .34 7885.18S 40.67W S .60 W .29 7944.73S 41.29W S .50 W .83 7976.85S 41.60W S 1.10 W 1.02 8020.30S 42.21W 7804.91 7884.49 7944.02 7976.14 8019.59 SPE~-~,~-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 500292254200 NORTH SLOPE COMPUTATION DATE: 2/28/9 DATE OF SURVEY: 013195 MWD SURVEY JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 13220 8958.94 8873.52 64 5 S 1.10 E 26.67 8038.37S 42.20W 8037.65 13248 8969.99 8884.57 68 35 S 2.90 E 17.39 8063.58S 41.31W 8062.87 13280 8980.68 8895.26 72 54 S 4.10 E 13.70 8094.15S 39.44W 8093.46 13312 8989.88 8904.46 73 48 S 4.20 E 2.82 8124.82S 37.21W 8124.15 13344 8998.58 8913.16 74 30 S 4.60 E 2.51 8155.37S 34.86W 8154.72 13376 9007.06 8921.64 74 24 S 6.10 E 4.58 8185.72S 32.02W 8185.09 13411 9016.48 8931.06 74 30 S 6.00 E .39 8219.36S 28.45W 8218.77 13440 9024.32 8938.90 74 18 S 7.10 E 3.69 8247.28S 25.25W 8246.72 13470 9032.08 8946.66 76 11 S 7.20 E 6.25 8276.51S 21.58W 8275.97 13502 9039.13 8953.71 77 35 S 7.40 E 4.54 8306.57S 17.73W 8306.07 13535 9045.75 8960.33 79 41 S 7.80 E 6.35 8339.26S 13.37W 8338.80 13566 9050.90 8965.48 81 11 S 8.30 E- 5.09 8369.54S 9.09W 8369.11 13598 9055.14 8969.72 83 30 S 9.10 E 7.62 8400.79S 4.30W 8400.41 13630 9058.16 8972.74 85 35 S 9.20 E 6.63 8431.96S .72E 8431.62 13663 9060.25 8974.83 87 5 S 9.60 E 4.73 8464.29S 6.07E 8464.00 13694 9061.48 8976.06 88 24 S 10.00 E 4.33 8495.19S ll.41E 8494.94 13700 9061.61 8976.19 88 54 S 10.14 E 9.78 8500.56S 12.36E 8500.33 13732 9061.88 8976.46 90 5 S 9.80 E 3.79 8532.60S 17.99E 8532.41 13763 9061.51 8976.09 91 18 S 10.90 E 5.30 8562.83S 23.51E 8562.69 13794 9060.66 8975.24 91 48 S 10.70 E 1.71 8593.82S 29.43E 8593.73 13825 9060.05 8974.63 90 30 S 12.40 E 7.07 8623.47S 35.49E 8623.44 13857 9060.72 8975.30 87 5 S 12.70 E 10.69 8654.63S 42.42E 8654.66 13888 9063.36 8977.94 83 24 S 14.30 E 12.65 8685.49S 49.83E 8685.59 13899 9064.67 8979.25 82 41 S 14.60 E 6.99 8695.95S 52.53E 8696.07 13907 9065.64 8980.22 83 0 S 14.40 E 4.62 8703.43S 54.46E 8703.57 13960 9072.03 8986.61 83 0 S 14.40 E .04 8753.85S 67.40E 8754.10 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 8754.11 FEET AT SOUTH 0 DEG. 26 MIN. EAST AT MD = 13960 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 179.48 DEG. TIE IN POINT 13694.54' wINDOW POINT 13700' INTERPOLATED DEPTH 13960' S~E,~.,f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 5oo2922542oo NORTH SLOPE COMPUTATION DATE: 2/28/95 DATE OF SURVEY: 013195 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -85.42 .00 N .00 E 1000 998.80 913.38 9.44 N 27.92 W 2000 1994.64 1909.22 26.85 N 98.69 W 3000 2990.92 2905.50 55.47 S 95.44 W 4000 3932.61 3847.19 360.89 S 89.21 W .00 1.20 1.20 5.36 4.16 9.08 3.72 67.39 58.32 5000 4671.65 4586.23 1029.76 S 121.84 W 6000 5193.62 5108.20 1880.91 S 87.55 W 7000 5711.94 5626.52 2734.94 S 44.64 W 8000 6230.09 6144.67 3589.82 S 26.59 W 9000 6747.92 6662.50 4444.53 S 58.79 W 328.35 260.96 806.38 478.03 1288.06 481.68 1769.91 481.85 2252.08 482.17 10000 7270.35 7184.93 5296.72 S 72.52 W 11000 7797.47 7712.05 6146.20 S 52.82 W 12000 8328.58 8243.16 6993.32 S 37.31 W 13000 8845.51 8760.09 7849.26 S 40.29 W 13960 9072.03 8986.61 8753.85 S 67.40 E 2729.65 477.56 3202.53 472.88 3671.42 468.90 4154.49 483.07 4887.97 733.47 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPEk~f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 500292254200 NORTH SLOPE COMPUTATION DATE: 2/28/95 DATE OF SURVEY: 013195 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -85.42 85 85.42 .00 185 185.42 100.00 285 285.42 200.00 385 385.42 300.00 .00 N .00 E .00 S .02 E .04 N .09 E · 18 N .23 E .33 N .44 E .00 .00 .00 .00 .00 .00 .00 .00 .00 485 485.42 400.00 585 585.42 500.00 685 685.42 600.00 785 785.42 700.00 885 885.42 800.00 .62 N .41 E 1.29 N .77 W 2.26 N 3.59 W 3.48 N 8.45 W 5.61 N 16.28 W .00 .00 .01 .01 .06 .05 .20 .14 .54 .34 986 985.42 900.00 1087 1085.42 1000.00 1187 1185.42 1100.00 1288 1285.42 1200.00 1389 1385.42 1300.00 8.92 N 26.44 W 12.84 N 37.69 W 17.48 N 48.45 W 23.62 N 57.52 W 30.49 N 65.78 W 1.11 .57 1.82 .71 2.51 .69 3.11 .60 3.69 .57 1489 1485.42 1400.00 1589 1585.42 1500.00 1690 1685.42 1600.00 1790 1785.42 1700.00 1890 1885.42 1800.00 36.39 N 73.67 W 39.58 N 80.89 W 39.69 N 87.59 W 37.28 N 94.25 W 33.07 N 98.30 W 4.18 .49 4.50 .32 4.74 .24 4.99 .25 5.18 .19 1990 1985.42 1900.00 2090 2085.42 2000.00 2191 2185.42 2100.00 2291 2285.42 2200.00 2391 2385.42 2300.00 27.38 N 98.70 W 21.64 N 98.55 W 15.96 N 98.32 W 10.22 N 98.11 W 4.32 N 98.13 W 5.34 .16 5.51 .16 5.67 .16 5.83 .16 6.01 .17 2491 2485.42 2400.00 2592 2585.42 2500.00 2692 2685.42 2600.00 2793 2785.42 2700.00 2893 2885.42 2800.00 2.60 S 98.32 W 11.38 S 98.69 W 21.31 S 98.80 W 31.79 S 98.09 W 42.67 S 97.13 W 6.25 .25 6.64 .39 7.13 .49 7.69 .55 8.28 .59 2994 2985.42 2900.00 3095 3085.42 3000.00 3196 3185.42 3100.00 3298 3285.42 3200.00 3400 3385.42 3300.00 54.73 S 95.56 W 9.03 .75 68.36 S 93.16 W 9.98 .95 83.17 S 90.77 W 11.10 1.12 100.90 S 88.62 W 12.71 1.60 122.61 S 86.62 W 15.07 2.36 S~Ek~.f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 5oo2922542oo NORTH SLOPE COMPUTATION DATE: 2/28/95 DATE OF SURVEY: 013195 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 3504 3485.42 3400.00 149.82 S 85.46 W 18.73 3610 3585.42 3500.00 184.87 S 85.72 W 24.73 3718 3685.42 3600.00 227.17 S 85.74 W 33.32 3830 3785.42 3700.00 276.39 S 86.53 W 44.79 3944 3885.42 3800.00 332.06 S 88.16 W 59.27 3.66 5.99 8.59 11.47 14.48 4063 3985.42 3900.00 395.72 S 90.91 W 77.88 4188 4085.42 4000.00 470.18 S 95.35 W 102.66 4319 4185.42 4100.00 555.49 S 98.97 W 134.18 4452 4285.42 4200.00 643.32 S 102.67 W 167.34 4588 4385.42 4300.00 735.64 S 107.31 W 203.53 18.60 24.79 31.52 33.15 36.19 4726 4485.42 4400.00 830.25 S 113.17 W 241.32 4868 4585.42 4500.00 930.89 S 117.43 W 283.29 5022 4685.42 4600.00 1047.18 S 122.34 W 336.79 5196 4785.42 4700.00 1189.70 S 121.58 W 410.97 5388 4885.42 4800.00 1353.18 S 116.92 W 502.70 37.79 41.97 53.50 74.18 91.73 5584 4985.42 4900.00 1522.50 S 109.39 W 599.50 5782 5085.42 5000.00 1692.37 S 99.06 W 696.89 5983 5185.42 5100.00 1866.60 S 88.40 W 798.07 6184 5285.42 5200.00 2040.17 S 78.80 W 898.61 6375 5385.42 5300.00 2203.16 S 70.34 W 990.03 96.80 97.39 101.17 100.55 91.42 6567 5485.42 5400.00 2366.74 S 62.57 W 1081.91 6758 5585.42 5500.00 2529.70 S 54.06 W 1173.30 6949 5685.42 5600.00 2692.04 S 46.44 W 1264.12 7140 5785.42 5700.00 2854.25 S 39.00 W 1354.82 7335 5885.42 5800.00 3021.55 S 33.24 W 1449.81 91.88 91.38 90.82 90.70 95.00 7530 5985.42 5900.00 3189.50 S 28.27 W 1545.36 7724 6085.42 6000.00 3355.84 S 24.89 W 1639.48 7914 6185.42 6100.00 3517.36 S 25.96 W 1729.45 8106 6285.42 6200.00 3680.90 S 27.49 W 1821.15 8300 6385.42 6300.00 3847.00 S 30.09 W 1915.05 95.54 94.12 89.97 91.70 93.90 8491 6485.42 6400.00 4009.84 S 36.11 W 2006.24 8684 6585.42 6500.00 4174.87 S 44.99 W 2099.42 8880 6685.42 6600.00 4342.54 S 52.37 W 2194.79 9072 6785.42 6700.00 4505.98 S 62.29 W 2286.66 9263 6885.42 6800.00 4668.68 S 69.45 W 2377.78 91.19 93.18 95.37 91.86 91.12 S~PE~-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/A-42 500292254200 NORTH SLOPE COMPUTATION DATE: 2/28/95 DATE OF SURVEY: 013195 JOB NUMBER: AK-MW-50002 KELLY BUSHING ELEV. = 85.42 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 9452 6985.42 6900.00 4829.37 S 76.08 W 2467.16 9644 7085.42 7000.00 4993.50 S 76.35 W 2559.38 9838 7185.42 7100.00 5158.82 S 73.46 W 2652.62 10029 7285.42 7200.00 5321.50 S 72.43 W 2743.58 10222 7385.42 7300.00 5487.43 S 70.46 W 2837.33 89.38 92.23 93.23 90.97 93.75 10412 7485.42 7400.00 5648.68 S 66.43 W 2927.13 10599 7585.42 7500.00 5806.71 S 62.28 W 3014.18 10788 7685.42 7600.00 5966.73 S 58.55 W 3102.93 10977 7785.42 7700.00 6126.85 S 53.50 W 3191.77 11167 7885.42 7800.00 6288.37 S 48.22 W 3281.82 89.80 87.06 88.74 88.85 90.05 11355 7985.42 7900.00 6447.32 S 44.79 W 3369.65 11542 8085.42 8000.00 6606.29 S 42.22 W 3457.47 11731 8185.42 8100.00 6765.68 S 40.29 W 3545.65 11918 8285.42 8200.00 6924.59 S 37.67 W 3633.42 12107 8385.42 8300.00 7085.12 S 36.82 W 3722.56 87.83 87.83 88.18 87.77 89.14 12298 8485.42 8400.00 7247.66 S 35.70 W 3813.41 12490 8585.42 8500.00 7411.37 S 35.44 W 3905.25 12687 8685.42 8600.00 7580.85 S 37.32 W 4002.04 12882 8785.42 8700.00 7748.85 S 39.41 W 4097.56 13077 8885.42 8800.00 7915.14 S 40.98 W 4191.61 90.85 91.84 96.79 95.52 94.05 13296 8985.42 8900.00 8109.66 S 38.32 W 4311.40 13960 9072.03 8986.61 8753.85 S 67.40 E 4887.97 119.78 576.57 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 3 February 1995 RE: Transmittal of Data ECC #: 6350.00 Sent by: MAIL Data: LDWG Dear Sir/Madam, Reference: BP A-42PH PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE + LIS Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: RECEIVED FEB 0 8 1995 Oil & (~a~ Cons. Commission Anchorage Ptsase si~a-and return pe+~o+~ech'_.%ica! Da~a Cen,~e~ ... LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 31 January 1995 RE: Transmittal of Data ECC #: 6350.00 Sent by: MAIL Data: LDWG Dear Sir/Madam, Reference: BP A-42PH PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: Prints/Films: DIFL/GR FINAL BL+RF Z DENSILOG FNL BL+RF BHC-AC FINAL BL+RF SUBSEA TVD FNL BL+RF BOREHOLE FNL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please s'~g~..~ and r~turn ha RECEIVED FEB 08 1995 Alaska Oil & Gas Cons. Commission Anchorage ,/ TONY KNOWLE$, GOVEF~NOFI 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 2?6-7542 January 6, 1995 Terry Jordan Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612. Re: Prudhoe Bay Unit A-42 BP Exploration (Alaska), Inc. Permit No. 95-02 Sur. Loc 2263'NSL, 1703'WEL, Sec. 35, TllN, R13E, UM Btmhole Loc. 1223'SNL, 1550'WEL, Sec. 11, T10N, R13E, UM Dear Mr. Jordan: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting-the Commission petroleum field inspector on the North Slope pager at David W. Jo~_~ Chairman · . BY OP~)ER OF THE COMMISSION dlf/Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill 1-111b. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenFII Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration 85.5' KB feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 47472 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 2263' NSL, 1703' WEL, Sec. 35 T11N R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 563' SNL, 1672'WEL, Sec. 11, TION R13E A-42 (31-11-10-13) 2S100302630-277 At total depth 9. Approximate spud date Amount 1223' SNL, 1550' WEL , Sec. 11, TION R13E 1/9/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD andTVD) property line ADL 47471 - 3730' feet No Close Approach feet 2560 13971' MD / 9026' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 500, feet Maximum hole angle 8z o Maximum sudace 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' Surface 35' 115' 115' 260 sx Arcticset (Approx) 13-1/2" 10-3/4" ' 45. 5# NT80 BTC 3057' 34' 34' 3091' 3085' 970 sx Cold Set 111/375 sx "G'/250 SX Cold Set II 9-7/8" 7-5/8" ! 29. 7#. L-80 NSCC 13053' 33' 33' 13086' 8885' 265 sx Class "G" 6-3/4" 4-1/2" · 12.6# S/rd L-80 NSCT 855' 12936' 8785' 13791' 9026' Uncemented SIt'd Liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural RECEIVED Conductor Surface JAN -3 1995 Intermediate Production Alaska 0il & Gas Cons, Corllmissi0n Liner . Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed reportr-I 20 AAC 25.050 requirements[] 21. I hereby ~~y~~going is true and correct to the best of my knowledge Signed T itl e Drillin~l En~lineer Supervisor Date Commission Use Only Permit Number APl number Approval date See cover letter ¢.~- ~ .2- 5 O- 0.~--. ~ '-' .~ 2_- ..,.z"' ¢7~.2_. ,/ -- ~,, ~ ,~,~'""- for other requirements Conditions of approval Samples required [] Yes j~ No Mud Icg required []Yes [] No Hydrogen sulfide measures [] Yes ,I~ No Directional survey required [] Yes [] No Required working pressure for BOPE~nJ~(¢~;d rE;I.3M; ~5M; I-IIOM; I-I15M; urlgmal ~;,, ,~r;,"'- '-' ~,,~ne~, ~,~Returned"~';, by order of Other: Approved by [~avid W. J0hrlst0rl ' commissioner ,ne comm.ssion Date I/(~ , Form 10-401 Rev. 12-1-85 Submit plicate ]Well Name: A-42 Well Plan Summary I Type of Well (producer or injector): I Pre-produced Injector S~rface Location: 2,263' FSL 1,703' FEL Sec 35 T11N R13E Start of Horizontal 563' FNL 1,672' FEL Sec 11 T10N R13E Location: End of Horizontal 1,223' FNL 1,550' FEL Sec 11 T10N R13E Location: [AFE Number: [4P0634 [Estimated Start Date: [ 1-9-95 I Rig: I Nabors 28-E Operating days to complete: IMD: I 13,971' I ITVD: 19,026' I J32 I RT-GL 35.1' IK~· 85.~' I IWell Design (conventional,slimhole,etc.) Slimhole Horizontal Formation Markers: Formation Tops MD TVD (RKB) Base Permafrost 2039' 2037' Ugnu 4A (K-15) 4527' 4275' Top Ugnu Injection 4790' 4541' Top of Cretaceous Injection Interval Base Ugnu Injection 6750' 5586' Btm of Cretaceous Injection Interval Top Seabee/K-10 7849' 6161' LCU/Top Kingak 1147 6' 8056' Sag River 13077' 8881' Oil/Gas - 7-5/8" Casing Point Top Shublik 13112' 8899' Top Sadlerochit 13296' 8890' Start of Horizontal 13426' 8997' Total Depth of Pilot 13616' 9158' 150'md below OOWC Well RECE Total Depth of 13971' 9026' Horizontal Well d VED 1995 AiaS~ 1~il & Gas Cons. Commission t. asing/J u'oing rro,,gram: ' ~c~ora.~'o Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg MD/TVD MD/TVD O.D. 30" 20" 91.5# H-40 Weld 80' 35'/35' 115'/115' 13-1/2" 10-3/4" 45.5# NT80 BTC 3057' 34'/34' 3091'/3085' 9-7/8" 7-5/8" 29.7# L-80 NSCC 13053' 33'/33' 13086'/8885' 6-3/4" 4-1/2" 12.6# L-80 NSCT 855' 12936'/8785' 13791'/9026' slotted Tubing 4-1/2" 12.6# L-80 NSCT 12904' 32'/32' 12936'/8785' Logging Pro l Open Hole Logs' 13-1/2" Hole 9-7/8" Hole 6-3/4" Hole Cased Hole Logs: }ram: None None BHC Sonic/DIFL/Density/S P/GR None (Possible Gyro if location is in question) VHH A-42 Well Plan Page 2 Date Revised' 1/3/94 Mud Program: Surface Mud Properties: 113-1/2" hole section: SPUD Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 0' 8.5 + 300 40-60 30-60 60-80 9-10 15-25 3,091' 9.5 <100 20-40 15-20 20-30 9-10 15-25 Hazards/Concerns Due to light ~'avel expectations, no real concerns in surface hole. Intermediate Mud Properties: ] 9-7/8" hole section to top of Sag: LSND Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 3,091' 8.8-9.0 35-40 8-12 3-6 8-10 9.0-9.5 8-12 5,000' > 9.8 11,300' < 6 13,086' 9.8-9.9 45-50 12-18 3-6 8-10 9-10 <6 Hazards/Concerns Cretaceoous Overpressure expected - plan MW to at least 9.8 ppg. Utilize hi vis sweeps to assist hole cleaning. Monitor LSYP and increase if problems occur trying to clean the hole. Reduce AP1 fluid loss to <6 cc before drilling Kingak Section. Lost Circulation potential as we cross faults & enter S ag River. Production Mud Properties' I 6-3/4" hole section: LSND for Pilot Hole I Xanvis KCL for Horizontal Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 13,086' 8.8-9.0 35-45 8-12 3-6 8-10 9-10 <6 13,616' 8.8-9.0 35-45 8-12 3-6 8-10 9-10 <6 Plugback Swap to Xanvis KC1 13,086' 8.8-9.0 35-45 8-12 3-6 8-10 9-10 <6 13,971' 8.8-9.0 35-45 8-12 3-6 8-10 9-10 <6 Hazards/Concerns Lost Circulation still a possibility due to severe overbalance in Sadlerochit. Differential sticking possible with overbalance situation. Ensure chlorides are below 12,000 ppm prior to logging. Directional: ]KOP: 1500' I R£¢[iYED Maximum Hole Angle: 187o Intermediate Tangent 158'5° Angle Close Approach Well' None The above listed wells will be secured during the close approach. aska Oil & Gas Cons. Commissior, Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Disposal: Cuttings Handling: CC2A Fluid Handling: CC2A until annular injection permits have been approved. Annular Injection: Use the following table as a reference for permitted wells. DO NOT EXCEED 35,000 BBLS IN THE ANNULUS. AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED VOL (aBES) (aBES) V~)A A-39 0 35,000 1/1/95-12/31/95 WOA A-40 0 35,000 1/1/95-1 2/31/95 ~ A-41 0 35,000 1/1/95-1 2/31/95 W(2~ A-42 0 35,000 1/1/95-1 2/31/95 I VHH A-42 Well Plan Page 3 Date Revised' 1/3/94 PROPOSED DRILLING AND COMPLETION PROGRAM WELL A-42 1. MIRU. NU diverter and function test same. . Drill 13-1/2" hole to + 3,091' md/3,085' tvd. Run and cement 10-3/4" 45.5# NT-80 BTC casing to surface. . Install blowout prevention equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer. Function test BOPE to 5,000/250 psi. . Test 10-3/4" casing to 3,000 psi for 30 minutes. A formation leak-off test will be performed 10' below the 10-3/4" shoe. . Directionally drill 9-7/8" hole to the top of the Sag River @ + 13,086' md/8,885' tvd. Run 7-5/8" 29.7# L-80 NSCC casing string and cement with Class G cement to 1,000' md above the casing shoe. Test casing to 3,500 psi. . Drill a 6-3/4" hole 10' outside of 7-5/8" casing and test the formation to a minimum of 0.5 ppg over the mud weight to be used to drill the hole section. Drill the 6-3/4" hole to the TD of the pilot well at + 13,616' md/9,158' tvd. Run DIL/BHCS/Density/SP/GR wireline logs across open hole. . Plugback pilot hole to the 7-5/8" casing shoe with a cement plug. Drill off cement plug and displace mud system to Xanvis KC1 mud system. Directionally drill to horizontal and continue to TD at_+ 13,971' md/9,026' tvd. . Make a hole opener run with a 7-5/8" casing scraper spaced to clean where the packer will be set. . Run 4-1/2" 12.6g NT-80 slotted NSCT liner with liner top packer and two external casing packers spaced in the open hole. Liner will be set at TD and lapped _+150' inside 7-5/8" casing shoe. Release from packer and displace Xanvis mud to filtered seawater. 10. Make an external casing packer inflation run. Perform cleanout trip as needed. Spot lithium hypochlorite breaker across liner length on last trip inside 4-1/2" liner. 11. Run 4-1/2" L-80 tubing with SSSV, GLM's, and 7-5/8" packer assembly. Set packer and test tubing annulus w/3,500 psi. 12. Set BPV. ND BOPE. Freeze protect well to 2100' TVD through shear valve in top GLM station. Release rig. Drilling Hazards · No hydrocarbon-bearing zones above the Sag River formation based on A Pad logs. · Losses have been encountered drilling the Kingiak, Sag River, and Sadlerochit formations on A pad. · A minimum of 9.8 ppg mud weight will be used to drill the Cretaceous injection interval. This will allow a 100 psi trip margin over the expected 9.3 ppg EMW @ 4455' sstvd. Well Plan Summary REC. EiVE'D CASING SIZE: 10-3/4" 10-3/4" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CIRC. TEMP: 40°F PREFLUSH: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET III ADDITIVES: retarder WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx APPROX. # SACKS' 970 MIX WATER: 10.53 gps THICKENING TIME: > 4 hrs TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 + 1.0 ghs FP-6L WEIGHT: 15.8 ppg YIELD' 1.15 ft3/sx APPROX. # SACKS: 375 MIX WATER: 4.95 gps THICKENING TIME: > 3-1/2 hrs TOP JOB CEMENT TYPE: COLD SET II ADDITIVES: WEIGHT: 14.95 ppg APPROX. # SACKS' 250 YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps THICKENING TIME: Greater than 2 hrs @ 50°F CENTRALIZER PLACEMENT: 1. Run 1 bow type centralizer per joint for the first 15 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME: 1. Lead slurry from TD to surface w/100% excess (less the tail slurry volume). 2. Tail slurry volume 375 sx (to cover 500' of casing shoe w/100% excess). 3. Top job volume 250 sx. RECEIVED JAN - ,5 1995 OiL & Gas Cons, Comml~lon Anchora~ Well Plan Summary 7-5/8" PROTECTION CASING CEMENT PROGRAM- BJ SERVICES CASING SIZE: 7-5/8" CIRC. TEMP: 140°F PREFLUSH: 20 bbls fresh water SPACER: 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1.0 ghs FP-6L WEIGHT: 15.8 ppg APPROX. # SACKS: 265 FLUID LOSS: 100-150 cc/30 minutes YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps THICKENING TIME: 3-1/2 to 4-1/2 hrs FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Run 1 Turbulators per joint from TD to 500' MD above shoe. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix the tail slurry on the fly. CEMENT VOLUME: 1. Tail slurry to 12,086' MD (1000' above shoe) 2. 80' MD 7-5/8" 29.7# capacity for float joints. Gas Cons. Commission Anchora, i~7 Well Plan Summary 4~_7 7849 !3c~5 :397! 0.00 43.35 74 Ol 870~ 87.01 ~- TF'~ ViEW V~_RT.~.A~_ SCALE i000 Ct. / DIVISION TVD REF: WELLHEAD VERTICAL SECTION REP WELLHEAD O---l. ? O.O0 8 0 MD I I JO.O0 ~ ~ MD i2.GO ~ 700 MD ! ' 4.00 P_ 9~0 MD !S~-~-I~ I 6,00 ~ !lO0 MD i ' ~ 6.00 ~ !300 ND ~ 4,cae !500 F~ $ 2.00 @ 1700 MD i $ o,o3 I81.DO 180.13 180.C0 17486 !7486 ~74.86 170.~ 170.~ ~70.~ 170.~ 169,69 ~6g.~ 16~.~ ~ ZO.~ N/S 667 72~ 7~ 8716 7537 ~l 7~]3 7~S 7~70 8~ ~ 0.0<3 e 2303 MD · 2.&3 8 Lmm3 MD $ 4.00 e 2703 ~ ~ ~ ~f~M~ m~ MD, m~ TV~ t6.50 ~ 3~53 MD ~.50 ~ 3653 MD ~5,5D ~ 3853 MD 4~ __ ~ 31.50 ~ 4053 ~3~.$0 ~ 4~53 x 43,35 ~ 45~ H9 ~mu Z~ne 4A (~4A) 6,~3 --J 6161 :447 49.00 @ 4753 MD 56.50 ~ 5053 MD 58.50 ~ 5550 MD gyro c~ni: 12130194 6:46 pm H3RiZONTAL VIEW (TRUE NF~RTH) SCALE l OOO ri:. / DIVISION SURVEY REF'. WELLHEAD 200O HALLIBURTDN ~13533,_ ,~Sj%L~ ~391M~, 308 3898 - 83i35 i iI436~, - !89113 i ~145~7 - !83i38 ~ 4641 ~80',,?g~003 I 96':3'3 PiL6-q'4 'E.%3 iL.___ 3450 58.50 e 7849 MD Top SeWoee (CH3) 6542 4741 - 180'33 4933 - I BO CO :---8_003 ~3,DO0 6161 - '.'8Ob-'O --,40rjO 8056 - 18033 Gas Cons, Commissioa Anchora" 58.50 ~ 11476 MD IKRU / LCU 58.50 e 11944 MD -200 800 1 BOO 2800 3800 4800 5800 6800 7800 T~-,qet No, me P~ P-J_YQ]W F?._ P~ PZLLSqF3 8886 7963 s ~ w 65.3401 5:~5 897'5 7963 S 456 W 65.~1 5,,,'~5 8975 ~ s 3~ w ~ ~ ~ ~79 S ~ E 6~ ~7~ ~ 7~ S 64 E ~ 5~ ~ 7~7 S ~78 ~ 6~ 5~7 ~ 7~1 S 2 W 6~ ~97 ~ 87~ S I~ E ~7 5~ TV I)  13970.63 8767.31 N/S 8765.97 S I E/w 153.37 E I WELLPLAN FEASIBILITY STUDY TAb plan is for feasibility purposes only, it has not yet been certified. RECEIVED o L VER I'ICAL VIEW SCALE 250 Ft, / TVI] RFP WELLHEAD VER I IC^L SEC I][}N REF', ~/L.I..I_I lEAl.) 8000 -- 8056-- 850~ -- 8600-- 8661 -- 8716 9085 9500-- ~ %8,5Q ~ 11476 MD II<RU / LCU ,@ 11944 ND ~ 12044 MI] 2_335 MD TJD 7275 - - %~5 ES 12529 Hi) CHECK 7442 ........................... ~L>5 L~ 1L!648 Mi] L'P~gln(lt 754~ ............ ~,~5 ~ 12755 MD '/J]~ 7636 .................................. ~~ E A ~1 g~ ~'1_ 6500 7000 VERTICAL SECTION PLANE: 179,00 f\) RECEIVED JAN -3 1995 oil & Gas Cons. Commission Anchora '~ Z () I 7500 8C]00 t 8500 1 WELL PERMIT CHECKLIST WELL NAME GEOL AREA UNIT# PROGRAM: exp [] dev [] redrll [] serv~ ON/OFF SHORE ~ ADMINISTRATION ENGINEERING 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool .............. 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... ' 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... ll. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... GEOLOGY 14. Conductor string provided ............... 15. Surface casing protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............ 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed ......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate ..................... 26. BOPE press rating adequate; test to ' ~~ psig. 27. Choke manifold complies w/API RP-53 (May 84) ...... 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............. 30. Permit can be issued w/o hydrogen sulfide measures .... Y N 31. Data presented on potential overpressure zones ..... 32. Seismic analysis ,of shallow gas zones .......... 33. Seabed condition survey (if off-shore) ......... 34. Contact name/phone for weekly progress reports ~ Y N [exploratory only] .... GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: HOW/jo - A:U::ORMS\cheklist my 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. _ape Subfile 2 is typ~: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 6417.00 R. JACKSON M. FERNANDEZ 500292254200 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 01-MAY-95 MWD RUN 6 R. JACKSON J. RALL MWD RUN 7 JACKSON/KREL J. RALL MAD RUN 9 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD R. JACKSON J. RALL lST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 11 10N 13E 85.42 83.92 33.52 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 30.000 20.000 115.0 13.500 10.750 3129.0 9.875 7.625 13170.0 6.750 13935.0 RECEIVED MAY 5 1995 Alaska 011 & Gas Cons. Commission Anchorage MWD - DGR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. LOCATION: 70.15.48 N, 148.45.26 W. MWD RUNS 5 & 6 WERE 4 3/4" DGWD WITH ROP. MWD RUN 7 WAS 4 3/4" DGWD/PHASE 4 EWR/DGR. MWD RUN 8 WAS 4 3/4" DGWD WITH ROP TO PLUGBACK POINT AT 13955' MD (THIS PORTION OF HOLE IS A-42ST). AFTER MWD RUN 8, AN OPEN HOLE SIDETRACK WAS PERFORMED AT 13675' MD (THIS MAKES UP FINAL PORTION OF FINAL A-42 BOREHOLE). RUN 9 WAS A WIPER PASS PERFORMED ON THE HOLE OPENER RUN. WIPE DATA WAS PRESENTED DUE TO A TOOL FAILURE DURING MWD RUN 8 (DRILLING CONTINUED ON HOLE OPENER ON THE SAME BIT RUN AS IN MWD RUN 8 EVEN THOUGH THE MWD MEASUREMENT TOOLS HAD FAILED). PRE FLO PRO SAMPLES AVERAGE OF 12 SAMPLES @ 13186' MD = 26.6 AAPI. POST FLO PRO SAMPLES AVERAGE OF 12 SAMPLES @ 13186' MD = 23.7 AAPI. APPARENT SHIFT = -2.9 AAPI DUE TO FLO PRO MUD. BLUELINE REFERENCE REMARK #11: CHANGE OVER FROM SCINT-ILLATION TUBE DETECTORS TO GEIGER MUELLER DETECTORS. BLUELINE REFERENCE REMARK #12: CHANGE OVER FROM GEIGER MUELLER DETECTORS TO SCINTILLATION TUBE DETECTORS. ALL DATA HAS BEEN SHIFTED UP 25 FEET TO THE WIRELINE GAMMA RAY DATA. THE SHIFT INCLUDES ALL DATA FROM THE CASING SHOE 13170' MD TO TD. THERE WAS UNCERTAINTY AS TO WHICH DEPTH TALLY WAS CORRECT, HOWEVER, THE SHIFT WAS MADE TO THE REFERENCE WIRELINE DATA OUT OF STANDARD PROCEDURES. ALL DEPTHS HAVE BEEN CORRECTED BY 25 FEET. THE ORIGINAL CASING SHOE DEPTH WAS 13195' MD. THE RAW DATA HAS NOT BEEN SHIFTED (AS ABOVE) & IS AS IT WAS WHEN RECORDED. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 13060.0 13908.0 RP 13164.0 13675.0 $ BASELINE CURVE FOR SHIFTS: GR (WALS 24-JAN-95) CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 13045.5 13067.5 13090.5 13112.5 13133.0 13155.0 13145.5 13165.0 13163.5 13189.5 13170.0 13195.0 13935.0 13960.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MAD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 5 13060.0 13170.0 6 13170.0 13247.0 7 13247.0 13675.0 9 13675.0 13935.0 MERGED MAIN PASS FROM FINAL HOLE. ALL CURVES WERE SHIFTED WITH GR. DATA HAS BEEN SHIFTED UP 25' TO AGREE WITH WIRELINE. CN WN FN COUN STAT / ? ? SHIFTFNL. OUT $ : BP EXPLORATION (ALAKSA) : A-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 1 2 RPX GR 68 1 3 RPS GR 68 1 4 RPM GR 68 1 5 RPD GR 68 1 6 ROP GR 68 1 7 FET GR 68 1 * DATA RECORD (TYPE# 0) Total Data Records: 57 ~PI 4 OHMM 4 OHMM 4 OH]4~ 4 OHMM 4 FPHR 4 HR 4 998 BYTES * 4 21 990 60 4 10 423 60 4 10 423 60 4 10 423 60 4 10 423 60 4 30 252 24 4 02 722 10 28 Tape File Start Depth = 13935.000000 Tape File End Depth = 13060.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14009 datums Tape Subfile: 2 185 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run-in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 13057.0 LOG i H~DER~DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13555.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 5. 24-JAN-95 MSC DGWD SERVICE VERSION 1.32 DEP VERSION 2.041 MEMORY 13590.0 13170.0 13590.0 0 56.6 59.0 TOOL NUMBER NGP 168 6.750 13170.0 LSND 9.50 40.0 8.9 1000 6.8 .000 .000 .000 o000 .0 162.7 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALAKSA) : A-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR .MWD 68 1 AAPI 2 ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 16 Tape File Start Depth = 13660.000000 Tape File End Depth = 13000.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3964 datums Tape Subfile: 3 79 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and' log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12868.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13215.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE $ 27-JAN-95 MSC DGWD SERVICE VERSION 1.32 DEP VERSION 2.041 MEMORY 13247.0 13170.0 13247.0 0 59.0 64.1 TOOL NUMBER NGP 168 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 13170.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND/FLO PRO 9.50 40.0 8.2 37000 5.7 .000 .000 .000 .000 .0 150.1 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 6. CN WN FN COUN STAT : BP EXPLORATION (ALAKSA) : A-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 13300.000000 Tape File End Depth = 12840.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16773 datums Tape Subfile: 4 74 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13182.0 EWR4 13189.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13792.0 13799.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE EWR4 ELECTROMAG. RESIS. 4 $ 29-JAN-95 MSC DGWD SERVICE VERSION 1.32 DEP VERSION 2.041 MEMORY 13853.0 13247.0 13853.0 0 72.9 95.8 TOOL NUMBER P0002SP4 P0002SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 13170.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO PRO 8.90 53.0 10.3 34000 6.1 .080 .040 .050 .180 72.0 154.3 72.0 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 7. DATA BELOW KOP OF 13675' MD BELONGS TO A-42ST. $ : BP EXPLORATION (ALAKSA) : A-42 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHM}4 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 ROP MWD 68 1 FPHR 4 7 FET MWD 68 1 HR 4 4 91 948 38 6 4 54 501 47 1 4 54 501 47 1 4 54 501 47 1 4 54 501 47 1 4 99 789 97 5 4 62 202 97 6 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 56 Tape File Start Depth = 13960.000000 Tape File End Depth = 13100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17733 datums Tape Subfile: 5 122 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MAD . Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 9 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13589.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13933.0 01-FEB-95 MSC DGWD SERVICE VERSION 1.32 DEP VERSION 2.041 MEMORY 13935.0 13675.0 13935.0 0 82.7 91.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE $ TOOL NUMBER NGP 69 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 13170.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO PRO 9.00 52.0 9.1 34000 5.7 .000 .000 .000 .000 .0 145.9 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .'000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT M~D RU~ 9. $ BP EXPLORATION (ALAKSA) A-42 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 4 2 ROP MAD 68 1 FPHR 4 4 54 433 96 6 4 37 304 39 5 Total Data Records: 11 Tape File Start Depth = 13960.000000 Tape File End Depth = 13500.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19537 datums Tape Subfile: 6 75 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS 95/ 4/27 01 **** REEL TRAILER **** 95/ 51 01 Tape Subfile: 7 2 records... 'Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 1 MAY 95 3:02p Elapsed execution time = 5.22 seconds. SYSTEM RETURN CODE = 0 ~e Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING CoMpANy: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 5 6415.00 R. JACKSON M. FERNANDEZ A-42PH 500292254280 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 01-MAY-95 MWD RUN MWD RUN 11 I0N 13E 85.42 83.92 33.52 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: MWD - DGR. ALL DEPTHS ARE MEASURED BIT DEPTHS. LOCATION: 70.15.48 N, 148.45.26 W. OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 30.000 20.000 115.0 13.500 10.750 3129.0 9.875 7.625 13170.0 6.750 13590.0 RECEIVED Alaska Oil & (~as Cons. Commission Anchorage RUN 1 WAS 8" DMWD DIRECTIONAL ONLY. RUNS 2 - 4 WERE 6 3/4" DMWD DIRECTIONAL ONLY. MWD RUN 5 WAS 4 3/4" DGWD WITH GAMMA RAY TO 13546' MD, TD OF PILOT HOLE. PRE FLO PRO SAMPLES AVERAGE OF 12 SAMPLES @ 13186' MD = 26.6 AAPI. POST FLO PRO SAMPLES AVERAGE OF 12 SAMPLES @ 13186' MD = 23.7 AAPI. APPARENT SHIFT = -2.9 AAPI DUE TO FLO PRO MUD. PILOT HOLE DATA WAS DEPTH SHIFTED TO WIRELINE GAMMA RAY (WALS, 24-JAN-95). ~'ILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 13045.0 $ BASELINE CURVE FOR SHIFTS: GR (WALS, CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 13090.5 13112.5 13133.0 13155.0 13145.5 13165.0 13163.5 13189.5 13172.0 13197.0 13189.5 13215.5 13205.5 13231.0 13226.5 13251.0 13231.0 13255.0 13234.5 13258.5 13241.5 13266.0 13244.5 13270.5 13248.0 13274.5 13255.0 13280.0 13263.5 13287.5 13282.5 13306.5 13307.0 13328.0 13311.0 13332.5 13321.0 13343.5 13327.0 13349.0 13328.0 13350.5 13335.0 13357.5 13341.5 13363.0 13392.5 13414.0 13412.0 13434.0 13438.0 13458.0 13443.5 13464.5 13483.5 13504.0 13500.0 13518.5 13508.5 13529.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: all bit runs merged. STOP DEPTH 13546.0 24-JAN-95) EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 5 13045.0 13590.0 MERGED MAIN PASS FROM PILOT HOLE. ALL CURVES WERE SHIFTED WITH GR. DATA HAS BEEN DEPTH SHIFTED TO AGREE WITH WIRELINE. / ?? SHIFTPH. OUT $ CN WN FN COUN STAT : BP EXPLORATION (ALAKSA) : A-42PH : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR GR 68 1 AAPI 4 2 ROP GR 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 21 990 60 6 4 02 722 10 0 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 14 Tape File Start Depth = 13595.000000 Tape File End Depth = 13040.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3334 datums Tape Subfile: 2 135 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes · £ape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: ·5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 13057.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13555.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE $ 24-JAN-95 MSC DGWD SERVICE VERSION 1.32 DEP VERSION 2.041 MEMORY 13590.0 13170.0 13590.0 0 56.6 59.0 TOOL NUMBER NGP 168 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 13170.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.50 40.0 8.9 1000 6.8 .000 .000 .000 .000 .0 162.7 .0 .0 NEUTRON TOOL MATRIX ' · MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 5. CN WN FN COUN STAT : BP EXPLORATION (ALAKSA) : A-42PH : PRUDHOE BAY : NORTH SLOPE .- ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 16 Tape File Start Depth = 13660.000000 Tape File End Depth = 13000.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3964 datums Tape Subfile: 3 79 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS 95/ 4/27 01 **** REEL TRAILER **** 95/ 5/ I 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 1 MAY 95 3:31p Elapsed execution time = 2.80 seconds. SYSTEM RETURN CODE = 0 ~pe Subfile 2 is type: LIS TAPE HEADER PRUDHOE BaY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE-CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 6416.00 R. JACKSON M. FERNANDEZ 500292254271 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 01-MAY- 95 MWD RUN 6 R. JACKSON J. RALL MWD RUN 7 JACKSON/KREL J. RALL MWD RUN 8 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: MWD - DGR/EWR4. JACKSON/KREL J. RALL 11 10N 13E 85.42 83.92 33.52 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 30.000 20.000 115.0 13.500 10.750 3129.0 9.875 7.625 13170.0 6.750 13955.0 ALL DEPTHS ARE MEASURED BIT DEPTHS. LOCATION: 70.15.48 N, 148.45.26 W. RECEIVED MAY 5 1995 Alaska Oil & Gas Cons. Commission Anchorage MWD RUNS 5 & 6 WERE 4 3/4" DGWD WITH ROP. MWD RUN 7 WAS 4 3/4" DGWD/PHASE 4 EWR/DGR. MWD RUN 8 WAS 4 3/4" DGWD WITH ROP TO PLUGBACK POINT AT 13955' MD. PRE FLO PRO SAMPLES AVERAGE OF 12 SAMPLES @ 13186' MD = 26.6 AAPI. POST FLO PRO SAMPLES AVERAGE OF 12 SAMPLES @ 13186' MD = 23.7 AAPI. APPARENT SHIFT = -2.9 AAPI DUE TO FLO PRO MUD. BLUELINE REFERENCE REMARK #9: CHANGE OVER FROM SCINT- A- 42 PH PRUDHOE BAY Run 1' 24 - January - 1995 DIFI_/AC/ZDI_/GR RECEIVED FEB 0 8 1995 WESTERN ATLAS A,aska Oil & Gas Cons. commis~d[~l~ Wireline Services Anchorage 3174 3590 Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD RUN 1 6350.00 BRAD ESARY SEE REMARKS A - 42 PH 500292254280 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 02-FEB-95 RUN 2 RUN 3 35 liN 13E 2263 1703 85.40 50.40 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 6.750 REMARKS: DIFL/AC/ZDL/GR. 7.625 13195.0 13600.0 CIRCULATION STOPPED AT 1000, 24-JAN-95. LOGS WITNESSED BY: M. FERNANDEZ & R. GRABB NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER CORRECTED, CHISM FILTERING IS ACTIVE, CASING CORRECTIONS OFF, SALINITY = 0.00 PPM. PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC- TIONS WERE APPLIED TO THE DIL DATA. THE DIL DATA WAS CALIPER CORRECTED. THE CORRECTED DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES. RT = TRUE FORMATION RESISTIVITY. DI = DEPTH OF INVASION. DIL AFTER LOG VERIFICATIONS WERE NOT WITHIN SPECIFICA- TIONS. THE REPEAT PASS WAS REPROCESSED WITH AFTER LOG VERIFICATION READINGS. THE MAIN & REPROCESSED REPEAT PASS OVERLAY. THIS INDICATED THE TOOL SIGNAL DID NOT CHANGE UNTIL AFTER THE MAIN PASS WAS RECORDED. DID NOT RECORD GAMMA RAY AFTER LOG VERIFICATION DUE TO LOST TOOL SIGNAL AT SURFACE. CALIPER VERIFICATIONS PERFORMED IN CASING. BEFORE LOG VERIFICATION READ LOW. LOG RESPONSE APPEARED NORMAL AND AFTER LOG VERIFIED CORRECTLY. NOTE ACOUSTIC CYCLE SKIPS FROM 13314 - 13322'. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR BCS DIL SDN $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) depth shifted and clipped curves; .5000 START DEPTH STOP DEPTH 13174.0 13514.0 13174.0 13561.0 13174.0 13590.0 13174.0 13531.0 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH LL8 ILM DT RHOB 13180.0 13180.5 13179.0 13180.0 13181.5 13184.5 13183.0 13187.5 13188.0 13187.0 13196.0 13195.5 13198.0 13196.0 13203.0 13203.0 13202.0 13203.0 13205.5 13205.5 13205.5 13208.5 13207.0 13215.5 13215.5 13219.5 13219.0 13220.5 13220.0 13222.0 13222.0 13223.5 13223.5 13232.0 13232.5 13232.5 13233.5 13233.0 13234.0 13237.0 13236.5 13237.5 13237.0 13240.5 13239.5 13244.5 13245.0 13246.0 13244.5 13244.0 13248.5 13248.0 13250.5 13250.0 13264.0 13263.0 13264.5 13265.0 13267.5 13269.5 13268.5 13280.5 13279.0 13281.0 13280.0 13281.5 13281.0 13283.5 13281.5 13285.0 13284.0 13285.5 13284.5 13284.5 13289.0 13288.0 13290.0 13289.0 13290.0 13289.5 13294.0 13292.5 13294.5 13293.5 13297.5 13296.0 13298.0 13297.5 all runs merged; SP 13181.0 13245.0 13270.0 13283.0 no case 13298.5 13303.0 13306.0 13306.5 13309.0 13310.5 13316.5 13319.5 13320.0 13322.5 13324.5 13326.5 13327.0 13329.0 13337.0 13337.5 13347.5 13361.5 13362.0 13367.0 13376.0 13378.5 13389.0 13398.0 13411.0 13411.5 13412.0 13412.5 13414.0 13414.5 13430.0 13430.5 13440.5 13441.0 13448.5 13449.0 13452.0 13452.5 13453.0 13460.0 13467.0 13470.0 13482.5 13485.0 13485.5 13499.0 13499.5 13510.0 13510.5 13514.0 13519.5 13522.5 13538.5 13554.0 13569.0 $ MERGED DATA SOURCE PBU TOOL CODE GR 13298.0 13306.5 13308.0 13309.5 13325.0 13336.5 13396.0 13413.5 13429.5 13439.5 13484.5 13498.5 13510.0 RUN NO. 1 13304.5 13314.5 13317.5 13321.5 13324.5 13327.5 13335.5 13377,5 13397.0 13453.0 13484.0 13514.0 13568.0 PASS NO. 3 13297.5 13302.5 13302.5 13306.5 13306.0 13320.0 13322.5 13326.0 13325.5 13325.5 13336.5 13336.0 13347.0 13360.0 13366.0 13376.0 13361.0 13387.5 13387.0 13396.5 13395.5 13410.0 13410.5 13429.5 13440.5 13448.5 13412.0 13414.5 13429.5 13439.5 13449.0 13451.5 13459.5 13466.0 13469.5 13452.5 13484.5 13484.0 13499.5 13509.0 13500.0 13519.5 13522.0 MERGE TOP 13174.0 13538.5 13555.0 13336.5 13398.0 13411.5 13430.0 13440.5 13452.0 13484.5 13510.5 MERGE BASE 13514.0 BCS DIL SDN $ REMARKS: 13174.0 13174.0 13174.0 OPEN HOLE portion of MAIN PASS. MTEM, TEND, & TENS WERE SHIFTED WITH LLS. ILD, RT, & DI WERE SHIFTED WITH ILM. DRHO, PEF, & CALl WERE SHIFTED WITH RHOB. 13561.0 13590.0 13531.0 CN WN FN COUN STAT /??MATCH1.OUT /??MATCH2.OUT /??MATCH3.0UT /??MATCH4.OUT /??MATCH5.OUT $ BP EXPLORATION (ALASKA) A-42 PH PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR BCS 68 1 GAPI 4 2 DT BCS 68 1 US/F 4 3 TEND BCS 68 1 LB 4 4 TENS BCS 68 1 LB 4 5 LL8 DIL 68 1 OHMM 4 6 ILM DIL 68 1 OHMM 4 7 ILD DIL 68 1 OHMM 4 8 RT DIL 68 1 OHMM 4 9 DI DIL 68 1 IN 4 10 SP DIL 68 1 MV 4 11 MTEM DIL 68 1 DEGF 4 12 RHOB SDN 68 1 G/C3 4 13 DRHO SDN 68 1 G/C3 4 14 PEF SDN 68 1 BN/E 4 15 CALl SDN 68 1 IN 4 4 67 465 06 6 4 84 653 71 5 4 20 789 90 0 4 20 789 90 0 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 22 779 91 0 4 22 779 91 0 4 22 779 91 0 4 22 779 91 0 60 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 60 Tape File Start Depth = 13617.000000 ILLATION TUBE DETECTORS TO GEIGER MUELLER DETECTORS. BLUELINE REFERENCE REMARK #10: CHANGE OVER FROM GEIGER MUELLER DETECTORS TO SCINTILLATION TUBE DETECTORS. ALL DATA HAS BEEN SHIFTED UP 25 FEET TO THE WIRELINE GAMMA RAY DATA. THE SHIFT INCLUDES ALL DATA FROM THE CASING SHOE 13170' MD TO TD. THERE WAS UNCERTAINTY AS TO WHICH DEPTH TALLY WAS CORRECT, HOWEVER, THE SHIFT WAS MADE TO THE REFERENCE WIRELINE DATA OUT OF STANDARD PROCEDURES. ALL DEPTHS HAVE BEEN CORRECTED BY 25 FEET. THE ORIGINAL CASING SHOE DEPTH WAS 13195' MD. THE RAW DATA HAS NOT BEEN SHIFTED (AS ABOVE) & IS AS IT WAS WHEN RECORDED. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 13045.0 13898.0 RP 13164.0 13773.0 $ BASELINE CURVE FOR SHIFTS: GR (WALS, 24-JAN-95) CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 13045.5 13067.5 13090.5 13112.5 13133.0 13155.0 13145.5 13165.0 13163.5 13189.5 13170.0 13195.0 13955.0 13980.0 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 5 13045.0 MWD 6 13170.0 MWD 7 13247.0 MWD 8 13853.0 $ REMARKS: MERGE BASE 13170.0 13247.0 13853.0 13955.0 MERGED MAIN PASS FROM SIDETRACK HOLE. ALL CURVES WERE SHIFTED WITH GR. DATA HAS BEEN SHIFTED UP 25' TO AGREE WITH WIRELINE. CN WN FN COUN STAT /??SHIFTST . OUT $ : BP EXPLORATION (ALAKSA) : A-42ST : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 1 2 RPX GR 68 1 3 RPS GR 68 1 4 RPM GR 68 1 5 RPD GR 68 1 6 ROP GR 68 1 7 FET GR 68 1 * DATA RECORD (TYPE# 0) Total Data Records: 65 ~PI 4 OHMM 4 OHMM 4 OHMM 4 OHMM 4 FPHR 4 HR 4 998 BYTES * 4 21 990 60 4 10 423 60 4 10 423 60 4 10 423 60 4 10 423 60 4 30 252 24 4 02 722 10 28 Tape File Start Depth = 14000.000000 Tape File End Depth = 13000.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16009 datums Tape Subfile: 2 185 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and' log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 13057.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13555.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE $ 24-JAN-95 MSC DGWD SERVICE VERSION 1.32 DEP VERSION 2.041 MEMORY 13590.0 13170.0 13590.0 0 56.6 59.0 TOOL NUMBER NGP 168 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 13170.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.50 40.0 8.9 1000 6.8 .000 .000 .000 .000 .0 162.7 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 5. CN WN FN COUN STAT : BP EXPLORATION (ALAKSA) : A-42ST : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: API API API API Log Crv Crv 1 GR MWD 68 1 AAPI 4 4 91 948 38 6 2 ROP MWD 68 1 FPHR 4 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 16 Tape File Start Depth = 13660.000000 Tape File End Depth = 13000.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3964 datums Tape Subfile: 3 79 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12868.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE STOP DEPTH 13215.0 27-JAN-95 MEMORY 13247.0 13170.0 13247.0 0 59.0 64.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE $ TOOL NUMBER NGP 168 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 13170.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND/FLO PRO 9.50 40.0 8.2 37000 5.7 .000 .000 o000 .000 .0 150.1 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 6. DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: CN WN FN COUN STAT : BP EXPLORATION (ALAKSA) : A-42ST : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: API API API API Log Crv Crv ............. ~ ............ ~ .... Name~T~--~r~-Qd~sa~p~e~.units ....... _~s-i~ze~-,~Leng~h~ T.y~Ty~¢t-s--.-Mod~---~.~.----., ......... , ...... · ~ 1 GR MWD 68 1 AAPI 4 4 91 948 38 6 2 ROP MWD 68 1 FPHR 4 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 13300.000000 Tape File End Depth = 12840.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18773 datums Tape Subfile: 4 74 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and' log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13182.0 13792.0 EWR4 13189.0 13799.0 $ :LOG HEADER DATA .... DATE~LOGGED: 29-JAN-95 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): -MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): DEP VERSION 2.041 MEMORY 13853.0 13247.0 13853.0 0 72.9 95.8 TOOL NUMBER P0002SP4 P0002SP4 6.750 13170.0 FLO PRO 8.90 53.0 10.3 34000 6.1 .080 .040 .050 .180 72.0 154.3 72.0 72.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 7. $ : BP EXPLORATION (ALAKSA) : A-42ST : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: ................ ~ , ........ ~ .................... ~ - ........ API-API-API. API.. Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 ROP MWD 68 1 FPHR 4 7 FET MWD 68 1 HR 4 4 91 948 38 6 4 54 501 47 1 4 54 501 47 1 4 54 501 47 1 4 54 501 47 1 4 99 789 97 5 4 62 202 97 6 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 56 Tape File Start Depth = 13960.000000 Tape File End Depth = 13100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17733 datums Tape Subfile: 5 121 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD ~. Curves and' log header data for each bit run in separate files. BIT- 'RUN- 'NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13792 . 0 13924 . 0 $ LOG HEADER DATA DATE LOGGED: .... 31-JAN- 95 j~ SOFTWARE SURFACE SOFTWARE VERSION: MSC DGWD SERVICE VERSION 1.32 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 8. MEMORY 13955.0 13675.0 13955.0 0 84.3 95.8 TOOL NUMBER NGP 168 6.750 13170.0 FLO PRO 8.95 53.0 9.6 35000 6.0 .000 .000 .000 .000 .0 141.7 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALAKSA) : A-42ST : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 4 Tape File Start Depth = 13960.000000 Tape File End Depth = 13800.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19737 datums Tape Subfile: 6 67 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS 95/ 4/27 01 **** REEL TRAILER **** 95/ 5/ 1 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 1 MAY 95 3:46p Elapsed execution time = 4.29 seconds. SYSTEM RETURN CODE = 0 Tape File End Depth = 13174.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14193 datums Tape Subfile: 2 271 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 13062.0 13174.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH $ REMARKS: CASED HOLE portion of MAIN PASS. CN WN FN COUN STAT BP EXPLORATION (ALASKA) A-42 PH PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TaPe depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH GR 68 1 GAPI 2 MTEM GR 68 1 DEGF 3 TEND GR 68 1 LB 4 TENS GR 68 1 LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 21 990 60 6 4 45 987 88 5 4 10 579 41 1 4 10 579 41 1 16 * DATA RECORD (TYPE# 0) Total Data Records: 1006 BYTES * Tape File Start Depth = 13174.000000 Tape File End Depth = 13049.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1256 datums Tape Subfile: 3 33 records... Minimum record length: 26 bytes Maximum record length: 1006 bytes Tape Subfile 4 is type: LIS TOOL STRING NUMBER: pASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 1 3 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13057.0 13530.5 AC 13170.0 13578.0 DIFL 13170.0 13594.5 ZDL 13169.0 13547.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): 24-JAN-95 FSYS JlV2 BETA RELEASE 4 1000 24-JAN-95 1951 24-JAN-95 13600.0 13593.0 13062.0 13590.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL GR ZDL KNJT TEMP PCM KNJT AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB GAMMA RAY Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR KNUCKLE JOINT BHC ACOUSTILOG DUAL INDUCTION TOOL NUMBER 3974XA 3967XA 3517XA 1309XA 2222EA/2222MA 392 iNA 2806XA 3506XA 392 iNA 1609EA/1603MA 1503XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 6.750 13195.0 13174.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): LSND 9.00 33.0 9.7 7.0 MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : A- 42 PH : PRUDHOE BAY : NORTH SLOPE : ALASKA 206.2 3.620 45.0 .880 206.2 3.780 45.0 .000 .0 2.850 45.0 .000 .0 2.65 .000 1.5 * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 17 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR AC 68 1 GAPI 2 AC AC 68 1 US/F 3 CHT AC 68 1 LB 4 TTEN AC 68 1 LB 5 SPD AC 68 1 F/MN 6 RFOC DIFL 68 1 OHMM 7 RILMDIFL 68 1 OHMM 8 RILD DIFL 68 1 OHMM 9 RT DIFL 68 1 OHMM 10 DI DIFL 68 1 IN 11 VILD DIFL 68 1 MV 12 SP DIFL 68 1 MV 13 TEMP DIFL 68 1 DEGF 14 ZDEN ZDL 68 1 G/C3 15 ZCOR ZDL 68 1 G/C3 16 PE ZDL 68 I BN/E 17 CAL ZDL 68 1 IN 4 4 06 969 49 6 4 4 48 852 89 1 4 4 95 558 30 1 4 4 95 558 30 1 4 4 61 094 30 1 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 04 903 06 0 4 4 06 213 78 0 4 4 04 522 10 6 4 4 53 419 67 0 4 4 40 467 34 0 4 4 52 443 33 1 4 4 09 884 61 1 4 4 76 731 33 1 4 4 24 115 90 6 68 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 163 Tape File Start Depth = 13617.000000 Tape File End Depth = 13049.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55108 datums Tape Subfile: 4 244 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 4 .2500 VENDOR TOOL CODE START DEPTH GR 13170.0 AC 13170.0 DIL 13170.0 ZDL 13170.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 13532.5 13580.0 13594.5 13544.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL GR ZDL KNJT TEMP PCM KNJT AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB GAMMARAY Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR KNUCKLE JOINT BHC ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) 24-JAN-95 FSYS J1V2 BETA RELEASE 4 1000 24-JAN-95 2045 24-JAN-95 13600.0 13593.0 13062.0 13590.0 1800.0 TOOL NUMBER 3974XA 3967XA 3517XA 1309XA 2222EA/2222MA 3921NA 2806XA 3506XA 3921NA 1609EA/1603MA 1503XA 6.750 13195.0 13174.0 LSND 9.00 33.0 9.7 7.0 206.2 MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMALOR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : A-42PH : PRUDHOE BAY : NORTH SLOPE : ALASKA 3.620 45.0 .880 206.2 3.780 45.0 .000 .0 2.850 45.0 .000 .0 2.65 .000 1.5 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 17 Curves: Name Tool Code Samples Units API API API API Log Crv Crv size Length Typ Typ Cls Mod 1 GR AC 68 1 GAPI 2 AC AC 68 1 US/F 3 CHT AC 68 1 LB 4 TTEN AC 68 1 LB 5 SPD AC 68 1 F/MN 6 RFOC DIFL 68 1 OHMM 7 RILM DIFL 68 1 OHMM 8 RILD DIFL 68 1 OHMM 9 RT DIFL 68 1 OHMM 10 DI DIFL 68 1 IN 11 VILD DIFL 68 1 MV 12 SP DIFL 68 1 MV 13 TEMP DIFL 68 1 DEGF 14 ZDEN ZDL 68 1 G/C3 15 ZCOR ZDL 68 1 G/C3 16 PE ZDL 68 1 BN/E 17 CAL ZDL 68 1 IN 4 4 06 969 49 6 4 4 48 852 89 1 4 4 95 558 30 1 4 4 95 558 30 1 4 4 61 094 30 1 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 04 903 06 0 4 4 06 213 78 0 4 4 04 522 10 6 4 4 53 419 67 0 4 4 40 467 34 0 4 4 52 443 33 1 4 4 09 884 61 4 4 76 731 33 1 4 4 24 115 90 6 68 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 131 Tape File Start-Depth = 13619.000000 Tape File End Depth = 13163.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 34107 datums Tape Subfile: 5 210 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS 951 2~02 01 **** REEL TRAILER **** 95/ 2/ 2 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 2 FEB 95 10:14a Elapsed execution time = 5.87 seconds. SYSTEM RETURN CODE = 0