HomeMy WebLinkAbout2019 Oooguruk-Nuiqsut Oil PoolAnnual Reservoir Surveillance Report
Oooguruk-Nuiqsut Oil Pool (ONOP)
Oooguruk Field
May 15th, 2020
Eni Petroleum – Alaska Development
Table of Contents
SUBJECT PAGE
1.0 Progress of the Enhanced Recovery Project................................................................ 1
2.0 Results and Analysis of Reservoir Pressure Surveys within the Pool ....................... 2
3.0 Results and Analysis of Production and Injection Log Surveys, Tracer Surveys,
Observation Well Surveys and Any Other Special Monitoring................................... 2
4.0 Review of Pool Production Allocation Factors and Issues Over the Year.................. 3
5.0 Reservoir Management Summary ................................................................................. 3
ATTACHMENTS
ATTACHMENT A: ONOP Well Location Map........................................................................ 5
ATTACHMENT B: 2019 ONOP Voidage Balance by Month.................................................. 6
ATTACHMENT C: ONOP Pressure Report, Form 10-412...................................................... 7
ATTACHMENT D: ONOP Reservoir Pressure Map – December, 2019.................................. 9
ATTACHMENT E: ONOP Annual Reservoir Properties Report, Form 10-428.......................10
Eni Petroleum – Alaska Development Page 1
1.0 Progress of the Enhanced Recovery Project
Eni US Operating Co. Inc. (Eni) acquired 100% working interest ownership of the
producing assets within the Oooguruk Unit (OU) on January 31, 2019; the voluntary OU
contraction was approved effective June 1, 2019 and Eni was designated the operator
effective August 1, 2019 following resignation of Caelus Natural Resources Alaska, LLC
(Caelus) as operator. The OU was contracted to exclude southern leases. None of the
contracted area was producing oil or gas.
At the end of 2019, there were 28 active Oooguruk-Nuiqsut Oil Pool (ONOP) development
wells, including 18 producer and ten injection wells. The locations of the existing and
planned Oooguruk Nuiqsut Oil Pool (ONOP) wells, the current OU, and Oooguruk Nuiqsut
Participating Area (ONPA) are shown in Attachment A. No rig workovers nor new drilling
were conducted in the ONOP in 2019. However, Eni initiated rig repairs, maintenance,
and material purchases in preparation for future OU workover and drilling programs.
Currently all ONOP production wells rely on gas lift for artificial lift.
Within the central Kalubik fault block, ODSN-01A, ODSN-31, ODSN-37 and ODSN-42B
produced consistently during 2019. Production from wells ODSN-24, ODSN-25 and
ODSN-36 was limited due to non-competitive total gas oil ratios (TGOR) on gas lift. Water
and gas injection, if allowed, continued in ODSN-19i, ODSN-26i, ODSN-32i, and ODSN-
34i when available*.
In the southern Colville Delta fault block, ODSN-16 produced consistently throughout
2019 despite a failed ESP in April 2019; the backup gas lift system has been effective
and the TGOR remains competitive. The ODSN-17 ESP also failed in May 2019. Due to
non-competitive total gas oil ratios on gas lift production from both ODSN-17 and ODSN-
18 was limited during 2019. Offtake from ODSN-10, ODSN-22 and ODSN-43 were
restricted to manage voidage replacement and the producing GORs by alternating
production cycles from the wells. Water and gas injection, if allowed, continued in ODSN-
15i, ODSN-23i and ODSN-48i when available*.
Within the northern Ivik fault block, ODSN-02, ODSN-04, ODSN-06, and ODSN-28
produced consistently during 2019. ODSN-29 Nuiqsut production remained shut-in for
evaluation and testing of the Kuparuk in the area from the well via a selective single
completion installed in 2017. The long-term plan, which requires AOGCC approval, is to
commingle production from the two pools at this location or alternate production from
each zone as the Kuparuk is much more prolific and is currently at a higher pressure than
the underlying Nuiqsut in the area. Ivik production was supported by water injection in
wells ODSN-03i, ODSN-07i and ODSN-27i when available*.
Annual average daily ONOP production during 2019 was 7,158 BOPD. Total oil
production from the ONOP during 2019 was 2,612,652 barrels and is 29,221,755 barrels
since field start-up thru 2019. The annual average producing GOR and watercut were
1,024 SCF/STBO and 18%, respectively.
Annual average daily ONOP injection during 2019 was 6,211 BWPD and 3,166 Mscfd.
Cumulative water injection in the ONOP during 2019 was 2,266,892 barrels and
23,928,378 barrels since the start of the project. Total gas injection in the ONOP during
2019 was 1,156 MMscf and 11,973 MMscf since the start of the project. When available*
Eni Petroleum – Alaska Development Page 2
seawater and gas injection continued in the ONOP; water injection occurred 184 days
and gas injection 284 days during the year. Attachment B details the 2019 voidage
balance for the ONOP.
(*Refer to Section 5 for additional information regarding seawater availability)
2.0 Results and Analysis of Reservoir Pressure Surveys within the
Pool
Thirty-six pressure surveys recorded between December 2018 and January 2020 were
reported from 22 wells. The details of the surveys and interpretation are presented in
Attachments C and D. The estimated average ONOP reservoir pressure is currently
2,620 psi at 6,350 ft TVDss (refer to Attachment E, Nuiqsut Annual Reservoir Properties
Report Form 10-428).
3.0 Results and Analysis of Production and Injection Log Surveys,
Tracer Surveys, Observation Well Surveys and Any Other
Special Monitoring
Well surveillance equipment was placed in the liners of seventeen Nuiqsut wells during
the initial completions. The systems are in-place to assess production profiles and
continuity along the lateral via target fluid tracers, which are monitored and analyzed by
collecting surface fluid samples during restarts and over time. The tracers have recently
been used to assess hydraulic connectivity along the laterals to evaluate the need for coil
tubing interventions to clear any sand or debris blocking the flow path. The tracers will
also be used, where available, to help diagnose water breakthrough in the future. Monthly
samples are currently collected in five wells: ODSN-01A, ODSN-10, ODSN-22, ODSN-
28 and ODSN-43.
An extended reservoir surveillance and remedial program is ongoing in the Ivik block
ODSN-03i well pattern which had early water injection breakthrough in both offset
producing wells, ODSN-02 and ODSN-04. In July 2016 plugs were placed in the lateral
of ODSN-03i to isolate suspected thief zones and the response was monitored in the
ODSN-02 and ODSN-04 wells. A thief zone was identified in ODSN-03i in 2017 and
injection restored to the lateral. Remediation of the ODSN-03i thief interval using a
conformance gel treatment was completed in August 2018; injection was reestablished
and a coiled tubing conveyed log to assess the post-remediation change in injectivity
along the lateral was conducted in April 2019. Unfortunately, due to solids plugging of the
memory tools, a quantitative lateral profile was not completed. Qualitative temperature
logs suggest the thief interval is taking less fluid.
Eni Petroleum – Alaska Development Page 3
4.0 Review of Pool Production Allocation Factors and Issues Over
the Year
Production from the Oooguruk-Torok Oil Pool (OTOP), Oooguruk-Kuparuk Oil Pool
(OKOP) and Oooguruk-Nuiqsut Oil Pool (ONOP) is commingled at the surface into a
common production line. Allocation between the pools is based on the ratio of total
production for a pool to the total production for the Oooguruk Unit. The pool allocation
factors for 2019 are:
ONOP: 86.4%
OKOP: 10.8%
OTOP: 2.8%
Theoretical production for individual wells for all pools is calculated on a daily basis.
During 2019 wells were produced with chokes at 100% most of the time due to the
capacity of the production line. Daily theoretical production for a well was calculated using
the data from the most current well test and the amount of time a well was on production
for a given day:
oductionlDailyTheoreticaBOPDxDailyRate
dayMinutes
Minutes
Welltest
produced Pr)(
1440
The daily allocation factor for the unit is calculated by dividing the actual total production
for the day by the sum of the theoretical daily production for each individual well. Daily
allocated production is assigned to each well by multiplying its theoretical daily production
by the daily allocation factor.
The average daily allocation factor for 2019 was 1.0261.
5.0 Reservoir Management Summary
The Alaska Oil and Gas Conservation Commission (AOGCC) issued pool rules under
Conservation Orders No. 645, 596 and 597 for the OTOP, OKOP and ONOP,
respectively. While there is no subsurface commingling, unitized substances produced
from the three oil pools are commingled on the surface.
Area injection orders (AIO) authorizing the injection of fluids for enhanced oil recovery in
the Oooguruk-Torok, Oooguruk-Kuparuk, and Oooguruk-Nuiqsut reservoirs were issued
by the AOGCC as Area Injection Orders No. 37, 33 and 34, respectively. Injection
commenced into the ONOP in 2009.
During 2019 the ONOP Under-Saturated Water-Alternating-Gas (US-WAG) reservoir
management included maximizing voidage replacement and managing producing gas oil
ratios by cycling producing wells on and off production where possible operationally. The
current cumulative voidage replacement ratio is at 52% which is consistent with ratio of
injection wells to producing wells and the overall ONOP pattern layout. Attachment B
Eni Petroleum – Alaska Development Page 4
details the 2019 annual and cumulative voidage balance for the ONOP. In general
producing wells in the more mature flood areas have seen GOR stabilization, stabilized
or increased oil production, and some water breakthrough as expected. The average
ONOP producing GOR for 2019 was 1,024 SCF/STBO which is slightly lower than the
1,204 SCF/STBO GOR in 2018. The 2019 average ONOP watercut was 18%.
Continued flood throughput and reliable water supply are critical to long-term ONOP
recovery. Effective July 2019, KRU converted the 3-HAMI water injection line from
seawater to produced water. This removed the OU seawater supply access point at DS-
3A. No seawater was injected at ODS from July 4, 2019 through December 31, 2019.
Consequently, Eni moved forward with a seawater injection supply (SWIS) enhancement
project. The SWIS project will bypass KRU CPF-3 and consistently supply ODS with up
to 25,000 bpd of seawater, increase water injection reliability, and avoid produced water
injection at ODS. SWIS pipeline and pump module components were installed in 2019,
and start up is planned in May, 2020. In association with the SWIS project, water injection
supply pressures will be boosted from 2,800 psi to 3,700 psi. High pressure injection
testing to 3,300 psi in 2018 on four Oooguruk Nuiqust injection wells, ODSN-26i, ODSN-
27i, ODSN-32i and ODSN-34i, demonstrated an average four-fold increase in injectivity
with no containment or well integrity concerns, which is consistent with historical
performance and modeling. The AOGCC has confirmed increasing the pressure limit to
3,700 psi from 2,800 psi for the ONOP is consistent with AIO 34 in that the increased
pressure will not fracture the confining zones or migrate injected fluids out of the approved
injection stratum. Additionally, in 2018 ODSN-26i was stimulated using a coil tubing
placed treatment consisting of surfactant and solvent mixtures and downhole chlorine
dioxide (ClO2) generation as an oxidizing, biocide treatment to remove near wellbore
plugging. Efficacy of the treatment is under evaluation, pending restart of water injection
and subsequent stabilization; however, the initial results are encouraging and Eni is
evaluating treating additional ONOP injection wells.
Individual well and pattern surveillance data will continue to be collected to monitor
performance and improve recovery. A simulation model has been maintained and
updated to assist in reservoir and flood management decisions in the ONOP.
Eni Petroleum – Alaska Development Page 5
ATTACHMENT A
ONOP Well Location Map
Colville Delta
Kalubik Fault Block
Ivik Fault Block
Eni Petroleum – Alaska Development Page 6
ATTACHMENT B
2019 ONOP Voidage Balance by Month
Month
Oil,
MRB
Free Gas,
MRB
Water,
MRB
Total
Voidage,
MRB
Year Cum,
MRB
Cumsince
start-up,
MRB
Gas,
MRB
Water,
MRB
Total
Injection,
MRB
Year Cum,
MRB
Cum. since
start-up,
MRB
Net
Injection,
MRB
Year Cum,
MRB
Cumsince
start-up,
MRB
Cum Since Start-Upthru2018>> 57,532 CumSince Start-Upthru2018 >> 30,157 -27,375
Jan-19 289 469 45 803 803 58,336 134 335 469 469 30,627 -334 -334 -27,709
Feb-19 252 267 43 562 1,365 58,898 83 370 452 922 31,079 -110 -444 -27,819
Mar-19 235 276 43 554 1,919 59,452 103 422 525 1,446 31,604 -29 -473 -27,848
Apr-19 192 241 52 486 2,405 59,938 115 364 479 1,926 32,083 -7 -479 -27,854
May-19 286 298 65 649 3,054 60,587 79 393 473 2,398 32,556 -176 -656 -28,031
Jun-19 222 158 61 441 3,495 61,027 87 344 431 2,829 32,987 -10 -666 -28,041
Jul-19 270 229 54 553 4,049 61,581 61 39 100 2,929 33,087 -453 -1,119 -28,494
Aug-19 183 108 39 331 4,379 61,912 64 0 64 2,993 33,150 -267 -1,386 -28,761
Sep-19 282 192 49 522 4,901 62,433 98 0 98 3,091 33,248 -424 -1,810 -29,185
Oct-19 249 117 51 418 5,319 62,851 41 0 41 3,132 33,289 -377 -2,187 -29,562
Nov-19 270 217 44 530 5,849 63,382 0 0 0 3,132 33,289 -530 -2,717 -30,092
Dec-19 248 130 45 423 6,272 63,804 50 0 50 3,182 33,339 -373 -3,090 -30,465
2019 Totals 2,978 2,702 592 6,272 915 2,267 3,182 -3,090
Produced Fluids Injected Fluids Net Injection
Eni Petroleum – Alaska Development Page 7
ATTACHMENT C
ONOP Pressure Report, Form 10-412
6. Oil Gravity:
19 - 25
8. Well Name and
Number:
9. API Number
50XXXXXXXXXXXX NO
DASHES
10. Type
See
Instructions
11. AOGCC
Pool Code
12. Zone 13. Perforated
Intervals
Top - Bottom
TVDSS
14. Final Test
Date
15. Shut-In
Time, Hours
16. Press.
Surv. Type
(see
instructions for
codes)
17. B.H.
Temp.
18. Depth Tool
TVDSS
19. Final
Observed
Pressure at
Tool Depth
20. Datum
TVDSS (input)
21. Pressure
Gradient, psi/ft.
22. Pressure at
Datum (cal)
ODSN-01A 50703206480100 O 576150 Nuiqsut 6153 - 6232 8/17/2019 217 PBU 164 5,989 1,240 6,350 0.40 1,384
ODSN-02 50703206220000 O 576150 Nuiqsut 6226 - 6190 8/18/2019 240 PBU 156 5,789 1,792 6,350 0.40 2,016
ODSN-03 50703206890000 WI 576150 Nuiqsut 6318 - 6336 12/15/2019 3,959 PFO 154 6,272 2,600 6,350 0.44 2,635
ODSN-04 50703206700000 O 576150 Nuiqsut 6339 - 6307 8/18/2019 240 PBU 162 6,009 1,671 6,350 0.40 1,807
ODSN-06 50703207150000 O 576150 Nuiqsut 6363 - 6492 8/19/2019 250 PBU 163 6,062 1,275 6,350 0.38 1,385
ODSN-07 50703207250000 WI 576150 Nuiqsut 6147 - 6246 12/15/2019 3,948 PFO 139 5,802 3,267 6,350 0.44 3,510
ODSN-10 50703207190000 O 576150 Nuiqsut 6068 - 6111 5/2/2019 2,228 PBU 158 5,826 1,724 6,350 0.38 1,923
ODSN-10 50703207190000 O 576150 Nuiqsut 6068 - 6111 7/1/2019 720 PBU 159 5,826 1,637 6,350 0.38 1,836
ODSN-10 50703207190000 O 576150 Nuiqsut 6068 - 6111 8/31/2019 547 PBU 159 5,826 1,487 6,350 0.38 1,686
ODSN-10 50703207190000 O 576150 Nuiqsut 6068 - 6111 10/31/2019 741 PBU 159 5,826 1,458 6,350 0.38 1,657
ODSN-10 50703207190000 O 576150 Nuiqsut 6068 - 6111 12/15/2019 346 PBU 160 5,826 1,339 6,350 0.35 1,522
ODSN-15 50703206180000 WAG 576150 Nuiqsut 6133 - 6081 11/10/2018 3,707 SBHP 150 6,136 4,542 6,350 0.44 4,637
ODSN-16 50703206200000 O 576150 Nuiqsut 6192 - 6235 5/2/2019 322 PBU 171 6,074 2,221 6,350 0.40 2,332
ODSN-16 50703206200000 O 576150 Nuiqsut 6192 - 6235 8/18/2019 240 PBU 170 6,074 2,192 6,350 0.40 2,303
ODSN-17 50703206220000 O 576150 Nuiqsut 6122 - 6305 4/29/2019 1,564 PBU 172 6,087 2,361 6,350 0.38 2,461
ODSN-22 50703207080000 O 576150 Nuiqsut 6021 - 6140 1/16/2019 981 PBU 161 5,828 1,737 6,350 0.40 1,946
ODSN-22 50703207080000 O 576150 Nuiqsut 6021 - 6140 5/2/2019 1,851 PBU 161 5,828 1,835 6,350 0.40 2,044
ODSN-22 50703207080000 O 576150 Nuiqsut 6021 - 6140 7/1/2019 719 PBU 161 5,828 1,776 6,350 0.40 1,985
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
RESERVOIR PRESSURE REPORT
1. Operator: 2. Address:
7. Gas Gravity:
Oooguruk
Eni US Operating Company Inc. (Eni US) 3700 Centerpoint Drive, Suite 500, Anchorage, AK 99503
Oooguruk-Nuiqsut 6350 0.7
3. Unit or Lease Name: 4. Field and Pool: 5. Datum Reference:
Eni Petroleum – Alaska Development Page 8
6. Oil Gravity:
19 - 25
8. Well Name and
Number:
9. API Number
50XXXXXXXXXXXX NO
DASHES
10. Type
See
Instructions
11. AOGCC
Pool Code
12. Zone 13. Perforated
Intervals
Top - Bottom
TVDSS
14. Final Test
Date
15. Shut-In
Time, Hours
16. Press.
Surv. Type
(see
instructions for
codes)
17. B.H.
Temp.
18. Depth Tool
TVDSS
19. Final
Observed
Pressure at
Tool Depth
20. Datum
TVDSS (input)
21. Pressure
Gradient, psi/ft.
22. Pressure at
Datum (cal)
ODSN-22 50703207080000 O 576150 Nuiqsut 6021 - 6140 8/31/2019 556 PBU 161 5,828 1,691 6,350 0.40 1,900
ODSN-22 50703207080000 O 576150 Nuiqsut 6021 - 6140 10/31/2019 738 PBU 161 5,828 1,698 6,350 0.40 1,907
ODSN-22 50703207080000 O 576150 Nuiqsut 6021 - 6140 12/31/2019 742 PBU 161 5,828 1,684 6,350 0.40 1,893
ODSN-23 50703206390000 WAG 576150 Nuiqsut 6178 - 6555 12/17/2019 1,274 PFO 136 5,581 4,389 6,350 0.15 4,504
ODSN-25 50703206560000 O 576150 Nuiqsut 6080 - 6039 1/3/2020 5,067 SBHP 162 6,051 2,061 6,350 0.34 2,164
ODSN-26 50703206420000 WAG 576150 Nuiqsut 6056 - 6226 12/15/2019 3,959 PFO 144 5,922 4,012 6,350 0.15 4,077
ODSN-27 50703206550000 WI 576150 Nuiqsut 6375 - 6237 12/15/2019 3,959 PFO 141 5,878 3,319 6,350 0.44 3,529
ODSN-28 50703206760000 O 576150 Nuiqsut 6280 - 6315 8/18/2019 237 PBU 160 5,979 1,523 6,350 0.38 1,664
ODSN-31 50703205650000 O 576150 Nuiqsut 6074 - 6263 7/27/2019 1,159 PBU 163 5,754 1,898 6,350 0.40 2,136
ODSN-32 50703205660000 WAG 576150 Nuiqsut 6161 - 6214 12/31/2019 3,718 PFO 63 -13.5 3,076 6,350 0.15 4,031
ODSN-34 50703205630000 WI 576150 Nuiqsut 6323 - 6426 12/15/2019 3,959 PFO 61 -13.5 1,910 6,350 0.40 4,455
ODSN-36 50703205610000 O 576150 Nuiqsut 6258 - 6389 1/19/2020 4,671 SBHP 157 5,833 2,220 6,350 0.36 2,408
ODSN-42B 50703206050200 O 576150 Nuiqsut 6282 - 6466 8/18/2019 246 PBU 171 6,234 1,048 6,350 0.38 1,092
ODSN-43 50703206920000 O 576150 Nuiqsut 6085 - 6182 12/5/2018 1,680 PBU 160 5,775 2,213 6,350 0.40 2,443
ODSN-43 50703206920000 O 576150 Nuiqsut 6085 - 6182 1/30/2019 341 PBU 161 5,775 1,901 6,350 0.40 2,131
ODSN-43 50703206920000 O 576150 Nuiqsut 6085 - 6182 5/30/2019 667 SBHP 151 5,475 1,787 6,350 0.04 1,825
ODSN-48 50703206790000 WAG 576150 Nuiqsut 6004 - 6165 3/23/2019 3,367 PFO 148 5,851 3,786 6,350 0.15 3,861
ODSN-48 50703206790000 WAG 576150 Nuiqsut 6004 - 6165 12/30/2019 2,089 PFO 148 5,851 3,806 6,350 0.15 3,881
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
RESERVOIR PRESSURE REPORT
1. Operator: 2. Address:
Printed Name
Title
Date
Production Engineer
May 1, 2020Keith Lopez
Signature
23. All tests reported herein were made in accordance with the applicable rules, regulations and instructions of the Alaska Oil and Gas Conservation Commission.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
7. Gas Gravity:
Oooguruk
Eni US Operating Company Inc. (Eni US) 3700 Centerpoint Drive, Suite 500, Anchorage, AK 99503
Oooguruk-Nuiqsut 6350 0.7
3. Unit or Lease Name: 4. Field and Pool: 5. Datum Reference:
Eni Petroleum – Alaska Development Page 9
ATTACHMENT D
ONOP Reservoir Pressure Map – December, 2019
Eni Petroleum – Alaska Development Page 10
ATTACHMENT E
ONOP Annual Reservoir Properties Report, Form 10-428
3. Field and Pool
Code:
4. Pool Name 5. Reference
Datum (ft
TVDSS)
6. Temperature
(°F)
7. Porosity
(%)
8. Permeability
(md)
9. Swi (%) 10. Oil
Viscosity @
Original
Pressure
(cp)
11. Oil
Viscosity @
Saturation
Pressure (cp)
12. Original
Pressure
(psi)
13. Bubble
Point or Dew
Point
Pressure
(psi)
14. Current
Reservoir
Pressure
(psi)
15. Oil
Gravity
(°API)
16. Gas
Specific
Gravity (Air =
1.0)
17. Gross
Pay (ft)
18. Net Pay
(ft)
19. Original
Formation
Volume Factor
(RB/STB)
20. Bubble Point
Formation
Volume Factor
(RB/STB)
21. Gas
Compressibility
Factor (Z)
22. Original GOR
(SCF/STB)
23. Current GOR
(SCF/STB)
576150 Nuiqsut 6350 170 2 - 20 1 - 50 30 -60 3 - 7 3 - 7 3250 1900 2620 19 - 25 0.7 80 - 170 40 - 110 1.15 1.14 0.7 250 - 400 1024
5/1/2020
Printed Name Keith Lopez Date
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Title Production Engineer
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
ANNUAL RESERVOIR PROPERTIES REPORT
1. Operator: 2. Address:
Caelus Energy Alaska, LLC 3700 Centerpoint Drive, Suite 500, Anchorage AK 99503