Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout194-148 Pages NOT Scanned in this Well History File
·
·
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
i ~(--/~ File Number of Well History File
PAGES TO DELETE Complete
RESCAN
Color items - Pages:
Grayscale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original - Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
Logs of various kinds
[] Other
COMMENTS:
Scanned bY: Bevedy~Vincent
Nathan Lowell
Date:
[] TO RE-SCAN
Notes:
/si
Re-Scanned by' Bevedy Dianna Vincent Nathan Lowell Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 194-148 302-243
3. Address :8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20466-01
4. Location of well at surface' ' - ' ~ ~ i-~ i-~ '~-~-:~-'~;~,'~'~. 9. Unit or Lease Name
243' SNL, 500' WEL, SEC. 06, T11 N, R14E, UM~. Prudhoe Bay Unit
At top of productive interval
959' SNL, 4513' EWL, SEC. 05, T11N, R14E, UM
At total depth 10. Well Number
551' SNL, 249' EWL, SEC. 04, T11N, R14E, UM .............. E-09A
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 65.01' ADL 028303
12/28/1994 01/05/1995 ~ ~i' 02-8/,30/2002 /b~ N/A MSL Zero
17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD) 119. Directional SurveyI 20. Depth where SSSV setI 21. Thickness of Permafrost
11995 8878 FTI 11906 8880 FTI [] Yes [] NoI N/A MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
GR
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" x 30" Insulated Conductor Surface 110' 36" 11.8 cu yds Arcticset
13-3/8" 72# L-80 Surface 2671' 17-1/2" 2790 cuft Arcticsetll
9-5/8" 47# L-80 Surface 10213' 12-1/4" 1455 cuft Class 'G'~ 130 cuft AS
7" 29# L-80 9717' 10558' 8-1/2" 253 cuft Class 'G'
5" 15# 13Cr80 9553' 11995' 6" 250 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 9542' 9495'
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10680' Set Whipstock
10680' P&A with 30 Bbls Class 'G', Sqzd to
1000 psi
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production N/A
Date of Test Flours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
D
Brief description of lithology, porosity, fractures, apparent dips and presence of~l~gas or water. Submit core chips. I\ ~, ~.~ .L !
No core samples were taken. ~'-~'~ ~"~'-"'~' ~q~/'/v\ OCT 0 4 200~
.~,laska 0il & Gas Cons. Commission
Anchorage
Form 10-407 Rev. 07-01-80
Submit In Duplicate
129' Geologic Markers 130' Formation Tests
Marker Name Measured True Vertical' Include i'nterval tested, pressure data, all fluids recovered and
Depth Depth gravity, GOR, and time of each phase.
Zone 2B 10616' 8700'
Zone 1 B 10892' 8856'
RECEIVED
OCT O 4 2002
Alaska 0il & Gas Cons. Commission
Anchorage
'31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
I
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble "~j~,~' ~ Title TechnicalAssistant Date
E-09A 194-148 302-243 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No. Drilling Engineer' Alistair Sherwood, 564-4378
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 'J: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM '16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
,SCAi N n 5 20®
Form10-407 Rev. 07-01-80 ~ ~?}' ~ '..'~'~ ?' ~ ,? ~
Well: E-09B
Field: Prudhoe Bay Unit
APl: 50-029-20466-02
Permit: 202-161
Rig Accept:
Rig Spud:
Rig Release:
Drilling Rig:
O8/29/O2
09/01/02
09/08/02
Nordic #1
PRE-RIG WORK
02/27/02
DRIFTED TUBING INTO LINER TO 10886' ELM WITH A 3 3/8" DUMMY GUN. CALIPER CASINGFFBG FROM
10922' SLM. TO SURFACE. PULL GENERIC LGLV FROM GLM # 3, PUMP 240 BBLS CRUDE DOWN I/A, SET
DGLV W/RM LATCH IN GLM #3, PULL CATCHER SUB.
RESULTS OF PDS CALIPER SHOW THE TUBING AND LINER TO BE IN VERY GOOD SHAPE WITH NO
PENETRATION/WALL LOSS ON TUBING IN EXCESS OF 14% AND THE LINER IN EXCESS OF 9 %.
02/28/02
PULLED CATCHER SUB. WELL LEFT SHUT IN.
03/01/02
BLEED IA FROM 1540 PSI TO 730 PSI IN 90 MINUTES (PREP FOR MITIA FOR CTD SCREEN). IA FL ROSE
FROM 1990' TO 1535'. MITIA SCHEDULED.
03/04/02
MITIA PASSED TO 2500 PSI.
03/07/02
MITOA TO 1000 PSI PASSED.
04/15/02
PPPOT -T & PPPOT-IC PASSED.
08/2O/02
VALVE CREW SERVICED AND TESTED MASTER AND WING VALVES IN PREPARATION FOR NORDIC 1.
BP EXPLORATION Page 1 of 10
Operations Summary Report
Legal Well Name: E-09
Common Well Name: E-09 Spud Date: 5/4/1980
Event Name: REENTER+COMPLETE Start: 8/29/2002 End:
Contractor Name: NORDIC CALISTA Rig Release: 9/8/2002
Rig Name: NQRDIC 1 Rig Number: N1
Date From -To Hours Task Code NPT Phase Description of Operations
8/29/2002 00:00 - 01:00 1.00 MOB DECOMP Move rig to E-09A, position rig over well. Rig accept at 01:00
08/29/2002.
01:00 - 03:30 2.50 RIGU DECOMP NU BOPE, position cuttings tank, call out grease crew.
03:30 - 13:00 9.50 BOPSUF; DECOMP PT BOPE. Leu Grimaldi from AOGCC here to witness test.
13:00 - 13:50 0.831 CLEAN P DECOMP BOP test completed, all passed ok. MU Baker CTC, PT to
3500 psi, Pull test to 20klbs.
13:50 - 14:10 0.33 CLEAN P DECOMP Pre job safety meeting. Discuss hazards unique to this well.
14:10 - 15:40 1.50 CLEAN P DECOMP i Open master and swab valves. Well has swapped out since
load and kill yesterday. WHP=750 psi. IA=OA=0 psi. Try
bleeding to flowback tank. All gas. Rig up to bullhead gas
away with bio water in pits. Kill well with 250 bbls. Well on vac
at finish of kill.
15:40 - 16:20 0.67 CLEAN P DECOMP RU Baker milling BHA #1. 3.80" DSM, 3.80" string reamer,
motor, 2 jts PH6, MHA.
16:20 - 18:00 1.67 CLEAN P DECOMP RIH with BHA #1 to mill XN nipple at 9530'.
18:00 - 20:00 2.00 CLEAN P DECOMP 9500', Weight check up=34klbs. Dry tag top of XN nipple @
9530'. Make -11 correction to get on depth. Kick on pumps.
Free spin= 1500psi. LEL alarm in pits, divert returns to choke.
Pit vol=322bbls @ 18:25. IA=300psi. Seeing 300-500psi
motor work. Mill down thru nipple, backream up thru, mill
down, backream up. Run thru nipple dry, come back up thru
nipple dry. No bobbles. Down thru it again dry, no bobles.
20:00 - 22:25 2.42 CLEAN P DECOMP RIH to 10700'. Spot high vis pill. POOH.
22:25 - 23:15 0.83 CLEAN P DECOMP Stand back injector, LD milling assembly, prep rig floor for
eline.
23:15 - 23:30 0.25 EVAL ~ WEXIT PJSM, discuss rigging up SWS eline.
23:30 - 00:00 0.50 EYAL ~ WEXIT PU Eline tools: GPJCCL and 3.625" dummy whipstock drift
8/30/2002 00:00 - 02:15 2.25 EVAL 3 WEXIT RIH for 3.625" whipstock drift and GPJCCL Jewelry log.
02:15 - 03:00 0.75 EVAL ~ WEXIT Set down with 3.625" drift (18') & GPJCCL(16.7') @ 10,670 3x,
attempt to work past, no progress. Sart losing ground, last set
down 10605. Set down depth varies with RIH speed, believe
we may have some dogleg below the 7" window that is
preventing this tool from getting down. The whipstock will be 5'
shorter than the drift and approx. 300lbs heavier. If it is a
dogleg issue we may have a better chance at getting the
whipstock down. CCL shows all jewelry is where it should be.
03:00 - 05:00 2.00 EVAL P WEXIT i POH, discuss situation with A. Sherwood. Plan to try running
the whipstock on next run.
05:00 - 05:45 0.75 EVAL P WEXIT LD drift assembly.
05:45 - 06:15 0.50 STWHIP P WEXIT Safety meeting prior to picking up whipstock.
06:15 - 07:15 1.00 S'I-WHIP WEXIT Make up SWS setting tool and Baker whipstock.
07:15 - 09:30 2.25 STWHIP P WEXIT RIH with Baker 5" Retrievable monobore whipstock on SWS
setting tool with POS tool and CCL. Hang up at SSSV nipple,
can't get thru. POOH, check whipstock. No obvious marks.
Grind protection pad for anchor to smooth champher slightly.
RIH, still tagging up on SSSV nipple. Tag a couple of times
lightly, then POOH.
09:30 - 10:15 0.75 STWHIP N DPRB WEXIT Consult with Baker, and BP town. Baker is modifiing a new
bottom nose to have a more rounded profile to it.
10:15 - 10:30 0.25 STWHIP N DPRB WEXlT Attach new bottom nose to whipstock.
10:30 - 11:00 0.50 STWHIP N DPRB WEXIT RIH with Baker whipstock on Schlumberger wireline setting eq.
Can't get past SSSV nipple again. Same problem at same
depth.
Printed: 9/9/2002 12:22:50PM
BP EXPLORATION Page 2 of lO
Operations Summary Report
Legal Well Name: E-09
Common Well Name: E-09 Spud Date: 5/4/1980
Event Name: REENTER+COMPLETE Start: 8/29/2002 End:
Contractor Name: NORDIC CALISTA Rig Release: 9/8/2002
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
8/30/2002 11:00 - 13:25 2.42 STWHIP N DPRB WEXIT Tag up at surface, no obvious problem with whipstock. Need
to do something different. Call Baker and order 5" permananet
(old style) whipstock. Wait for new whipstock from Deadhorse.
13:25 - 14:30 1.08 STWHIP;N DPRB WEXIT Baker back on location. MU whipstock on catwalk. Scribe WS
to POS tool and calibrate. Disconnect and make tools up
vertically. Check scribe marks.
14:30 - 16:00 1.50 STWHIPi N DPRB WEXlT RIH with Baker WS on SWS eline. Slipped thru SSSV nipple
with no bobble at all on weight. Continue RIH.
16:00 - 16:30 0.50 STWHIP P WEXlT Log Whipstock into position. Set whipstock with top at 10680',
TF-17L. RA tag at 10689'.
16:30 - 17:40 1.17 STWHIP P WEXIT POOH with WS setting BHA.
17:40 - 18:15 0.58 STWHIP = WEXIT Rig down SWS setting BHA.
18:15 - 18:30 0.25 STWHIP = WEXIT Safety meeting prior to PU P&A BHA.
18:30 - 20:25 1.92 STWHIP = WEXlT PU Cementing BHA: Baker Coil Connector,XO, Dowel Hyd
Disconnect, Dowell Burst Disc Circ Sub, XO, BPX 2 jts 2-3/8"
PH6, XO, 13/16" ball drop Cementing Nozzle (4x 0.25" side
jets, 4x 0.1875"down jets, 3/4" center down jet). Postition
injector on well. Cementers on location @ 19:30.
20:25 - 22:10 1.75 STWHIP = WEXIT RIH with cementing nozzle. Pre job in ops cab prior to
pumping cement with cementers and rig crew.
22:10 - 22:35 0.42 STWHIP ~ WEXlT Tag Whipstock, depth correct to eline setting depth of 10680'
(subtract 8'). PU and flag pipe at 10670'md. Test to make
'sure we can bullhead fluid, 0.5bpm at 1500psi whp. Call A.
sherwood to discuss, decide to
22:35 - 23:30 0.92 STWHIP P WEXIT PT dowell lines to 4000psi. Good test. Start pumping 5bbls
Fresh water, 30bbl 15.8ppg neat cement, 5bbl Fresh water.
Start bullheading cement with 1500psi whp at 0.5bpm.
Pressure went to 1900psi when cement hit top perfs. Open
choke and POH holding 500psi on the choke.
23:30 - 00:00 0.50 STWHIP P WEXlT Start laying in cement 1:1, pull up to safety. Hold 1000psi with
chokes closed, WHP bled down to 800psi in 6-Smin., circulate
0.2bpm to get WHP back up to 1000psi. Slowly pushing
cement away to the perfs (less than 0.1 bpm).
613112002 00:00 - 01:00 1.00 STWHIP P WEXIT Hold 1000psi WHP while at safety for an additional 60minutes.
Started POH with 7bbls of cement below whipstock, pushed
away an additional 4.3 bbls to perfs while holding 1000psi at
safety. Prepare to drop ball. Cement thickening time= 4hrs
50min.
01:00 - 03:00 2.00 STWHIP ~ WEXlT Drop 13/16" ball for ball drop nozzle to cleanout cement. RIH
circulating at 70fpm, 3.5bpm/2475psi circ press. Cleanout
down to whipstock tray at 10680'. POH circulating to 9500',
rbih to whipstock tray 100fpm, 3.5bpm/2338psi. Repeat.
3up/3down passes total to clean above whipstock.
03:00 - 04:30 1.50 STWHIP = WEXlT POH, Prejob on jetting stack clean while pooh.
04:30 - 05:00 0.50 STWHIP = WEXlT Jet stack with swizzle stick.
05:00 - 05:30 0.50 STWHIP P WEXIT LD cementing nozzle, PU Milling assembly (in .8" HC DSM
, DPO261 + 3.8" STRING MILL)
05:30 - 06:30 1.00 STWHIP P WEXIT RIH with BHA #3, Window milling BHA. Hughes DSM-Baker
String reamer-BHI motor-Baker MHA.
06:30 - 08:45 2.25 STWHIP P WEXlT 4700', Continue RIH. Tour crew change OAP=0 psi, IAP=125
~si. Still no compressive strength on SWS cementers UCA.
08:45 - 10:00 1.25 STWHIP P WEXlT Cement to 1000 psi compressive strength according to SWS
UCA. RIH. weight check at 10600'=46klbs. Tag top of WS.
Printed: 9/9/2002 12:22:50 PM
BP EXPLORATION Page 3 of 10
Operations Summary Report
Legal Well Name: E-09
Common Well Name: E-09 Spud Date: 5/4/1980
Event Name: REENTER+COMPLETE Start: 8/29/2002 End:
Contractor Name: NORDIC CALISTA Rig Release: 9/8/2002
Rig Name: NORDIC 1 Rig Number: N1
Date From -To HOurs Task Code NPT Phase Description of Operations
8/31/2002 08:45 - 10:00 1.25 STWHIP P WEXIT Make -6.5' correction to 10680.5'. Paint yellow flag at window
start depth. Begin window milling. 2.5 bpm, 1950 psi free spin.
10:00- 11:00 1.00 STWHIP P WEXIT 10681', Update at 10:00, milling ahead. 600 lbs weight on bit,
150 psi motor work. 1 for 1 returns. Pit vo1-182 bbls.
11:00 - 12:00 1.00 STWHIP P WEXIT 10682.2', Update at 11:00, Milling ahead. 2700 lbs weight on
bit, 210 psi motor work. Pit Vo1=181 bbls.
12:00 - 13:00 1.00 STWHIP P WEXIT 10682.9', Update at 12:00, Milling ahead. 4400 lbs weight on
bit, 200 psi motor work. Pit vo1=182 bbls. Milling is going as
expected, getting good metal on ditch magnets.
13:00 - 14:00 1.00 STWHIP P WEXIT 10683.4', Update at 13:00, Milling ahead. 3850 lbs weight on
bit, 190 psi motor work. Pit Vo1--182 bbls.
14:00 - 15:00 1.00 STWHIP P WEXIT 10684.1', Update at 14:00, Milling ahead. 4300 lbs weight on
bit, 270 psi motor work. Pit vo1=183 bbls.
15:00 - 16:00 1.00 STWHIP P WEXIT 10685.9', Update at 15:00, Milling ahead. 4050 lbs weight on
bit, 150 psi motor work. Pit vo1=183 bbls.
16:00 - 17:00 1.00 STWHIP P WEXIT 10687.0', Update at 16:00, Milling ahead. 4400 lbs weight on
bit, 120 psi motor work. Pit vo1=185 bbls.
17:00 - 18:00 1.00 STWHIP ~ WEXlT i10687.6', Update at 17:00, Milling ahead. 3500 lbs weight on
bit, 190 psi motor work. Pit vo1=185 bbls.
18:00 - 18:20 0.33! STWHIP 3 WEXIT 10688.6', Update at 18:00, Milling ahead. 4400 lbs weight on
~bit, 380 psi motor work. Pit vo1=184 bbls.
18:20 - 19:15 0.92 STWHIP ~ WEXIT 10689.0', Formation sample examined by Geo contains 20%
pebbly chert cuttings. This is the bad kind of chert. The good
news is that we at least have a partial window. Continuing to
mill ahead. We have cut 8.5' of window so far. Window will be
9.0' if the mill stays on the tray all the way. Drilling break, ROP
~ncreasing. Belive we are milling formation. Sample from
10692' shows 90% of the cutttings are formation. 30%
Chert/70% Sand.
10693', Update at 19:00, Milling ahead, ROP increasing. 5362
lbs weight on bit, 206 psi motor work. Pit vo1-182 bbls.
19:15 - 21:25 2.17 STWHIP P WEXlT Pump high vis sweep. Pill on bottom at 10695'md. Mil to
10,698.4'. Start backreaming up through the window at 0.1fpm.
See slight motor work where the string reamer enters the
bottom of the window at 10687.7'. Back ream up thru the
window, no motor work except at the bottom of the window.
21:25 - 22:45 1.33 STWHIP P WEXIT Run back down thru the window at 0.6fpm to TD at 10698.2'.
Back reem up thru the window a 2nd time. RIH dry, no
bobbles. Back reem out of the hole one last time. Looks
clean. TOW=10680.5, BOW=10687.7
22:45 - 00:00 1.25 STWHIP P WEXIT Poh with window milling assembly
9/1/2002 00:00 - 00:30 0.50 STWHIP ~ WEXlT Continue poh with window milling assembly. Pre Job to discuss
directional plan with DD, Geo and Co. rep.
00:30 - 01:00 0.50 STWHIP ~ WEXlT Stand back injector. LD window milling assembly. Mill
iOD=3.8" , String reamer OD=3.8"
01:00 - 01:15 0.25 STWHIP ~ WEXlT PJSM w/Nordic, Sperry, Baker, Schlumberger hands. Do not
get complacent with safety. Discuss plan forward with build
assembly.
01:15 - 02:30 1.25 STWHIP P WEXlT Changeout Baker coil tubing connector for DS CTC. Pull
test(50K) and PT (3800psi) CTC. Good test. Pressure test DS
MHA.
Printed: 9/9/2002 12:22:50PM
BP EXPLORATION Page 4 of 10
Operations Summary Report
Legal Well Name: Eo09
Common Well Name: E-09 Spud Date: 5/4/1980
Event Name: REENTER+COMPLETE Start: 8/29/2002 End:
Contractor Name: NORDIC CALISTA Rig Release: 9/8/2002
Rig Name: NORDIC 1 Rig Number: N1
Date From- To Hours Task Code NPT Phase Description of Operations
9/1/2002 02:30 - 03:25 0.92 STWHIP P WEXlT PU build assembly
03:25 - 05:15 1.83 S-i'WHIP P WEXIT RIH with build assembly, 1.37deg motor, new DS49
(sr~103861). Shallow hole test MWD. Good test.
05:15 - 05:45 0.50 STWHIP P WEXlT Tie in near GR at 10,400. Subtract 4'.
05:45 - 06:05 0.33 STWHIP P WEXlT RIH past whipstock, on bobbles in window.
06:05- 06:30 0.42 STWHIP N DFAL WEXIT Work with MWD. Not getting pulses. Orient 1 time, and'it
started working.
-- 06:30 - 07:~,5' ' -1.25 DRILL P PROD1 10701', Begin drilling.' Still have 2# bio in the h01e. Fre'e
2.7 bpm @ 2730 psi. Drilling ahead 2.7/2.7/3100 psi. Starte,,,¢/
mud swap to used flo pro system. Annular pressures at
begining of day tour; OA=0 psi, IA=125 psi. Hard drilli~, slow
ROP, lots of stalls.
07:45 - 09:30 1.75 DRILL P PROD1 10740', Mud swap completed, now drilling with n~ flo pro
mud. ROP still slow - 35 fph. Not as many st~ as before.
2.7/2.7/3400 psi.
09:30 - 10:35 1.08 DRILL P PROD1 10795', ROP=24 fph. Pit vo1=292 bbls.~.7/2.7/3580, Geo
reports last sample at 10700' was ne~ly 100% chert. The
sample from 10750' was about 5.~)~ chert. Free spin with flo
pro=3300 psi.
10:35-11:00 0.42 DRILL P PROD1 10818', Drilling break. ROP~ptoT0fph. 2.7/2.7/3670 psi. Pit
vo1=291 bbls, WOB=27,~psi. _ ....
11:00 - 11:15 0.25 DRILL P PROD1 10850', Wiper trip t~6klbs, slick to shoe and
back to TD. ~' _ _ _
11:15 - 12:00 0.75 DRILL P PROD1 Resume drip291 bbls. ROP=100 fph.
12:00 - 12:10 0.171 DRILL P PROD1 Orient to 70~.
12:10- 13:35 1.42! DRILL P PROD1 iResume~illing. _ . _
13:35- 13:55 0.331 DRILL P PROD1 ~1100,~/V~t 36klbs. Smooth to
sh~ and back.
13:55 - 15:55 2.00 DRILL P PROD1 esume drilling. Free spin 3450 psi. 2.7/2.7/3950 psi. 286
j bbls pit vol. Minor losses while drilling. About 1.5 bbls/hour
TF=83L
15:55 - 16:00 0.08 DRILL P P~D1 11081', 100' wiper trip off bottom.
16:00 - 17:30 1.50 DRILL P,,~ROD1 Resume drilling.
117:30 - 19:05 1.58 DRILL P / PROD1 11155', Well is landed as per Geo at 8855', 5' deep to original
/
)lan. ROP has been slow for this last 80'. POOH to change
bits and adjust motor bend. Clean PU off bottom at 36klbs. No
)roblems coming up in open hole, or at window. OA=0psi,
IA=350psi at beginning of night tower.
19:05 - 19:50 0.75 DRILL/ PROD1 Stand back injector. LD build assembly. Inspect bit: broken
cutters + some matrix gone. Change out bit for new DS49
(sr1~103862) inspect motor: loose. Replace motor change
motor bend to 1.04deg. MWD/orientor working well, run the
same ones. Stab injector.
19:50 - 21:40 DRILL PROD1 RIH with lateral assembly. 1.04deg BHI HP motor, new
Hycalog DS49, Sperry hydraulic orientor, Sperry MWD.
21~40 - 22.'1~ 0.58 DRILL ~ PROD1 Tie-in to PIP tag at 10688.9 pulling back up thru window. No
correction.
22:15/,"22:40 0.42! DRILL P PROD1 Continue RIH.
4'D - 23:50 1.17 DRILL P PROD1 Orienting, getting 2 for 3 clicks. Free spin= 3200psi. Pit vol=
277bbls. Tag bottom at 11160'. 2.5/2.5/3520psi 79L. Slow
J ROP, stalling.
,02 23:50 - 00:00 0.17 DRILL P PROD1 .11188' 3940psi/2.7/2.7 82L. Pit Vol= 274bbls
9/2 00:00 - 01:00 1.00 DRILL P PROD1 Drilling. 11200'md 3650psi/2.7/2.7 Pit Vo1=274. 67L, Inc=90.4
,/
Printed: 9/9/2002 12:22:50 PM
2002
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension I-1 Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other /
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
Location of well at surface
243' SNL, 500' WEL, SEC. 06, T11N, R14E, UM
At top of productive interval
959' SNL, 4513' EWL, SEC. 05, T11N, R14E, UM
At effective depth
589' SNL, 5111' EWL, SEC. 04, T11N, R14E, UM
At total depth
551' SNL, 249' EWL, SEC. 04, T11N, R14E, UM
12.
Present well condition summary
Total depth: measured
Effective depth:
Casing
true vertical
measured
true vertical
11995 feet
8878 feet
11906 feet
8880 feet
Length
Size
Structural
Conductor 110' 20" x 30"
Surface 2671' 13-3/8"
Intermediate 10213' 9-5/8"
Production
Liner 841' 7"
Liner 2442' 5"
Plugs (measured)
Junk (measured)
5. Type of well:
[] Development
[] Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KB)
KBE = 65.01'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number //
E-09A
9. Permit Number
194-148
10. APl Number
50-029-20466-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Cemented MD -I-VD
11.8 cu yds Arcticset
2790 cu ft Arcticset II
1455 cu ft Class 'G', 130 cuft AS
110' 110'
2671' 2671'
10213' 8386'
253 cuft Class 'G'
286 cuft Class 'G'
9717' - 10558' 7983' - 8658'
9553' - 11995' 7849' - 8878'
Perforation depth: measured
true vertical
11036'-11076', 11130'-11240', 11450'-11590', 11660'-11780', 11830'-11900'
8898'-8900', 8899'-8895', 8882'-8881', 8881'-8882', 8881'-8881'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 tubing to 9542'; 2-7/8" Isolation Assembly from 11080' to 11122'
Packers and SSSV (type and measured depth) 5" Baker packer at 11080'; 9-5/8" TIW 'HBBP' packer at 9495'; 4-1/2" Otis SSSV Nipple
at 2083'
13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch
14. Estimated date for commencing operation/
August 7, 2002 /
16. If proposal was verbally approved
Name of approver
15. Status of well classifications as:
[]Oil [] Gas []Suspended
Service
Date Approved
Contact Engineer Name/Number: Alistair Sherwood, 564-4378 Prepared By Name/Numbec Terrie Hubble, 564-4628
17. I hereby certify that the fo~go/}n,g is true and correct to the best of my knowledge
Signed AlistairSherwood ~,.~(v/"~"~.~'~r~ ,Title CT Drilling Engineer Date
Conditions of Approval: Notify Commission so representative me, witness I Approval No. ~ O Z'" Z L./..
Plug integrity BOP Test /~ Location clearance__
Mechanical lntegrity Test__ Subsequent form required l0- /--~0'~' ~.~'-~--,," '~ ~f'¢~/<.- ¢¢~.'~/~-~-~'
Approved by order of the Commission Commissioner Date
Form 10-403 Rev. 06/15/88 Cammy Oe~i ~i U I ," ~., ,~, L Submit In Triplicate
bp
To:
Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Alistair Sherwood
CTD Engineer
Date: July 30, 2002
Re: CTD Sidetrack of well E-09a
When it becomes available in Sep 02, BP's new coil tubing drilling rig, Nordic 2 will drill a thru-tubing sidetrack
from E-09A. In mid Jul 01, E-09A became a swing well due to a >25000scf/stb GORCSince then uptime has
fallen from 30% to 10%. The sidetrack, E-09B will make the well competitive again. From a kick-off point in the
Ivishak lower Z2B formation from a window cut in the 5", 15# liner the 1400' sidetrack will target Zone 1A/1B
reserves in the far eastern part of E-pad. The following describes prep work for sidetracking and is submitted as
an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference.
1. All GLM's have been dummied off and MIT-IA tested successfully to 2500 psi. (4/3/02)
2. MIT-OA tested successfully to 1000psi. (3/7/02)
3. Tubing successfully drifted & callipered with PDS. (2/27/02)
4. Run & set 5" monobore whipstock at 10,675' with a zero degree TF for a highside exit.
5. P&A open perfs below the whipstock with 35bbls, (25 bbls in liner & 10bbls squeezed behind pipe)
The well will be prepared as soon as permitted. Nordic 2 is scheduled to be over the well, Sep 15th,
Alist~tir/Sherwood
CTD Drilling Engineer
CC: Well File
Terrie Hubble
WELLHEAD = 13:5/8" M~SEVOY
ACTUATOR = BAKEF
KB ELEV = 65.01
BF. ELEV = 30.76
KOP = 3200
Max Angle = 95 @ 11300
Datu~ MD= 10914
DatumTVD = 8800' SE
:
M,nimum ID = 2.205" @ 11114'
I
2~7/8" XN N PPLE I
2083' ]'-'[4-1/2" OTIS SSSV NiP, ID = 3.813"
GAS LIFT MA NDRB. S
I DIDEVI FLVFATOHI*O q DATE
9413 7671 37 MER RA
4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.953" ]'-{ 9542'
[TOPOF5" LINE~ ]--~ 9553'
]TOPOF7"LINER I--{ 9717'
9-5/8" CSG, 47#, L-80, ID = 8.68" 10213'
PERFORATION SUMMARY
REF LOG: SWS MWD GR 0115/95; ATLAS STP 02/09/95
ANGLEAT TOP PERF: 82 @ 11036'
Note: Refer to Production DB for historical perf data
I 7"LNR, 29#,L-80,0.0371 bpf, ID =6.184" I-"1 10898'
[ 11113'
I 2-7/8"TBG, L-80#,0.0188bpf, ID=4.408" I'-~ 11122'
94.95' ]--[4-1/2"TIWHI]BP~R, ID=4.32" I
9519' ]'-[4-1/2" OTIS X NIP, ID = 3,813"
9530' ]'-~4-1/2" OTIS XN NIP, ID= 3.725" I
9542' ]-[4-1/2,, W _EG,
9548' ]-~ ELMD ~r LOGGED 02/09/95I
MILLOUT WINDOW IN 7" @ 10569'
10558' - 10569'
10580'
11080' ]'--~5" BAKER F:KR, ID =2.500" I
11114' 1~2-7/6" XN NIP, ID = 2.205" ]
11122' ]--[2/7/8" WLEG ID: 2.441"
11906'
11995'
5" LNR, 15#, 13CR, 0.0188 bpf, ID = 4.408"
DATE REVBY COMMB',ITS i DATE REV BY COMMB'~S PRUDHOEBAY UNIT
05/80 ORIGINAL CQMPLETION WELL; E-09A
01/13/95 DFF S!D~CK COMPLETION PERMfT NO: 94~1480
01/29/01 SIS-QAA CONVERTEDTOCANVAS APiN0:50~029-20466-01
02/27!01 SIS.-LG FINAL Sec:6, T11N, R14E
07/18/01 RN/TP CORRECTIONS Bp ExPtorafi0n (Alaska)
DATE REVBY COMMB',ITS DATE REV BY COMMB'~S
05/80 ORIGINAL COMPLETION
01/13/95 DFF S!D~CK COMPLETION
01/29/01 SIS-OAA CONV~TOCANVAS
02/27/01 SIS-LG FINAl_
07/18/01 RN/TP CORRECTIONS
TREE= 4" 5M CNV
13-5/8" MCEVOY
ACTUATOR = BAKE
KB; ELEV = 65.01
BF; ELEV = 30.76'
KOF'= 3200'
95 @ ~ 1300;
8800' SS
13.3/8" CSG,72#, L-80, ID: 12.347" ]'-{ 2671'
MinimumlD= 2.205"@ 11114'
2-7/8" XN NIPPLE
E-09B
Proposed CTD Sidetrack
2083' ]-[4-1/2" OTIS SSSV NIR ID = 3.813" J
2620' H9-5/8" DV F'KRJ
GAS LIFT MANDRELS
ST MD T, VDIDE',,'ITYF IvLVlLATCHI O I D^TE I
-- 2 8264 6805 44 Mm RA
I 9413 7671 37 MER RA
9483' ]-[4-1/2" OTIS X NiP, ID= 3,813" J
9495' ].--[4-1/2"TNVHBBPPKR, ID=4,32" J
9519' ]-J4~1/2" OTiS X NIP, ID: 3,813" J
9530' ]--~4-1/2" OTIS XN NiP, ID = 3.725" J
4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.953" J'~ 9542'
JTOPOF5"LINER J--[ 9553'
9542' 4~1/2" WLEG, iD = 3.958"
9548' ELMD T~ LOGGED 02109/95 J
JTOPOF7"LINER J'-{ 9717'
J 9-5/8" CSG, 47#, 1-80, ID = 8.68" 10213'
10100' Top of 3-3/16" Liner
10100' Top of Cement
PERFORATION SUMMARY
REF LOG: SWS MWD GR 01/5/95; ATLAS STP 02/09/95
ANGLE AT TOP PERF: 82 @ 11036'
Note: Refer to Production DB for historical perf data
3-3/8. 6 11036,-11056'
3-3/8 4 11056 -11076'
3-3/8' 4 11130 ~11240'
3~3/8' 4 11450 -11590'
3-3/8" 4 J 11660'-11780'
11113'
J 2-7t8"TBG, L-80#, 0.0188 bpf. ID =4.408" J'--J 1112.2'
10580'
MILLOUTWINDOWIN 7"@10569' J
10558'-10569'
10675' Mechanical Whipstock ]
10705" 3-3/16 x 2-7/8 X-over ]
3-3/16" X 2~7t8" cmt'ed and 12470'
5" BAKER PKR, ID = 2.500'* J
1t114' I~ 2-7/8" ~ NiP, iD = 2.205"1
11122' J-J 2-718" WLEG ID = 2:441" J
5" LNR, 15#, 13CR, 0.0188 bpf, ID = 4.408" H 11995'
DATE REV BY COMMENTS DATE REV BY cOMMENTS PRUDHOE BAY UNrT
05~80 ORIOINA L COMPLETION WE~L: E-09A
01113/95 DEE SIDETRA OK COMPLETION PET~drr No: 94.1480
01/29101 SIS-QAA CONVERTEDTOCANVAS ARNo: 50-029-20466~01
02/27/0t S!S;EG FINAL secl 6, T11N, R14E
07/18/01 6Q~IONS BP Exp 0ration (Alaska)
DATE REV BY COMMENTS DATE REV BY COMMENTS
05/80 ORIOINA E COMPLETION
01113/95 DEE ~IDETRA CK COMPLETION
01/29101 SIS-QAA CONVERTEDTO CANVAS
02/27/0t S!S;EG FINAL
07/18/01 6Q~IONS
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - E-9A, AK-MW-40096
August 9, 1995
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this of this transmittal letter to the attention of:
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
E-9A:
2" x 5" MD Gamma Ray Logs:
50-029-20466-01
1 Blueline
1 Rev Folded Sepia
2" x 5" TVD Gamma Ray Logs:
50-029-20466-01
E-9A PBI:
2" x 5" MD Gamma Ray Logs:
50-029-20466-70
2" x 5" TVD Gamma Ray Logs:
50-029-20466-70
Blueline
Rev Folded Sepia
Blueline
Rev Folded Sepia
mue~me
Rev Folded Sepia
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-~*~-°~56 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL-COMPLETION OR REOOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] .....
· ,
2. Name of Operator 7. Permit Number
BP Exploration 94-148
3. Address 8. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 5o-029-28303
4. Location of well at sudace 9. Unit or Lease Name
243'SNL, 500'WEL, SEC. 6, T11N, R14E i il;'":~ ? :i~'-i;i~L i'i? i: ';~--&¥K'.~$tl Prudhoe Bay Unit
~ ;. :f~ E-O9A (11-4-11-14)
895' SNL, 748' WEL, SEC. 5, T11N, R14E ..
~ ~ :iil;:~i~l! ., ~~ 11. Field and Pool
At Total Depth ii .~~ !~~ Prudhoe Bay Field/Prudhoe Bay Pool
548'SNL, 250' EWL, SEC. 4, T11N, R14E ~:~-.
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
KBE = 65.01' I ADL 28303
1'2. Date Spudded 13. Date T.D.'Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. of Completions
12/28/94 1/5/95 1/13/95I N/A feet MSL One
1"7. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafros t
11995' MD/8878' TVD 11906' MD/8880' TVD YES [] N3 [] 2083' feet MD 1900' (Approx.)
22. Type Electric or Other Logs Run
GR
23. CASING, LINER AND cEMENTING RE0:~
· . ,
SE'FrlNG DEPTH MD
CASING SIZE VCF. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" X 30" Insulated conductor Surface 110' 36" 11.8 cu yds Arcticset
13-3/8" 72# L-80 Surface 2671' 17-1/2" 2790 cuft Arcticset II
9-5/8" 47# L-80 Surface 10558' 12-1/4" 1455 cuft "G'F130 cuft AS
5" 15# 130R80 9553' 11995' 6" 250 sx Class "G"
24'. Pedorations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
Gun Diameter 3~3/8" 4 spf 4-1/2", L-80 9542' 9495'& 9547'
MD TVD .
11130'-11240' 8782'-8811'
11450'- 11590' 8866'-8880' 26. ACID, FRACTURE, CEMENT SQUEF-'.'.'.'.'.'.'.'.~F, ETC.
11660'-11780' 8879'-8879' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11830'-11900' 8879'-8879'
....
.,
27. PRODUCTION TEST
Date First production IMethod of Operation (Flowing, gas lift, etc.)
1/24/95 I FIowing
Date of Test Hours Tested PRODUCTION FOR !OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD I~
Flow Tubing Casing Pressure CALCULATED=~. OIL-BBL GAS-MC~ ' vYATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
,
28. CORE DATA
Brief des<~ription of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water.' submit core chips.
RF.C£tV£D
A~s~,~ bii & Gas Cons. Comrnissior~
Anchor~., '
,, .
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME . · Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Subsea
GCC 10838' 8770'
TZ I B 10862' 8780'
RECEIVED
.. MAR 28 1995
: ,
Alaska 0ii & Gas Cons. Commission
Anchorc,
31. UST OF A'FFACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ¢~/ f~ Title Drilling Engineer Supervisor Date '~'~'~-~ ~
. .
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1- Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: E-09A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 12/19/94 04:00
SPUD:
RELEASE:
OPERATION:
DRLG RIG: DOYON 14
WO/C RIG: DOYON 14
12/20/94 (1)
TD:10986' ( 0)
12/21/94 (2)
TD:10986' ( 0)
12/22/94 (3)
T~:10986' ( 0)
12/23/94 (4)
TD:10986' ( 0)
TESTING BOPE MW: 0.0 VIS: 0
MOVE RIG F/ E-15A TO E-09A. RIG UP TO CIRC OUT DIESEL
FREEZE PROTECT AND TAKE ON SEAWATER. CHECK EVERY THING ON
PRE-SPUD CHECKLIST AND HOLD PRE-SPUD MEETING. RIG UP
LUBRICATOR AND PULL BACK PRESSURE VALVE. CIRC DIESEL OUT
OF ANNULUS AND TBG AND CIRC HOLE VOLUME. INSTALL 2 WAY
CHECK, TEST PACKOFF, OK. NIPPLE DOWN TREE AND NIPPLE UP
BOPE. TEST BOPE.
CIRC TO POH MW: 0.0 VIS: 0
TEST BOPE. RIG UP DRILL SITE MAINTENANCE LUBRICATOR, PULL
BPV AND RIG DOWN. PULL TBG HANGER TO RIG FLOOR AND LAY
DOWN SAME. CIRC BOTTOMS UP. RIG UP AND LAY DOWN 4.5"
12.6% L-80 TDS TBG AND CONTROL LINES, 25 RUBBER CLAMPS AND
4 STEEL BANDS, 2 GLM'S, 1 BALL VALVE, CUT OFF PIECE CLEAN.
INSTALL WEAR BUSHING. MAKE UP BHA AND RIH. PICK UP 153
JTS 5" DP OFF RACK. FISHING F/ CUT OFF PIECE, ONLY PULL
5000% OVER, COULD BE SLIPPING OFF FISH OR HAVE SHORT PIECE
OF TBG. CIRC TO POH.
POH FOR WASH OVER SHOE TO MILR MW: 0.0 VIS: 0
CIRC BOTTOMS UP W/ FISH POSIABLE IN 8 1/8" OVER SHOT. POH
W/. 4.5" TBG STUB, 4.5" "K" ANCHOR AND 24" OF TIW HBBP 9
5/8" X 4" PKR W/ COLLET AND RETRIEVING SLEEVE INSIDE.
BACKED OFF THREAD DOWN. SLIP AND CUT DRLG LINE. WAIT ON
4" GRAPPLE. M/U SPEAR W/ 4.010" GRAPPLE ON A 4' EXTENSION,
BUMPER SUB, JARS, 9- 6 3/4" DC'S, O/X RIH ON 5" DP TO
9616'. ENGAGE FISH JAR. PKR NOT IN RELEASE POSITION.
RELEASE OFF PKR. CHECK FOR FLOW. POH L.D SPEAR. CHECK W/
TIW ON HOW TO RELEASE PKR. RERUN TIW PKR PARTS TREADS DOWN
"K" ANDCHOR, 4.5" PUP JT, X/O RIH ON 5" DP TO 9616'
ATTEMPT TO SCREW INTO TIW PKR WERE PARTED, UNABLE TO TORQUE
UP, WILL HOLE 1000 PSI W/ 15K SET IN BOX. CHECK FLOW, POH
FOR WASH OVER SHOE.
MILLING ON PKR MW: 0.0 VIS: 0
CONTINUE TO POH L/D "K" ANCHOR W/ PKR THREAD @ 4.5" PUP JT.
P/U TRI STATE 8.5" MILL W/ 3 1/8" BULL NOSE MILL, 3 BOOT
BASKETS, BUMPER SUB, SUPER JAR, 9- 6 3/4" DC'S, X/O, 12- 5"
HWDP RIH TO 9616'. MILL ON 9 5/8" X 4" TIW HBBP PACKER F/
9616 - 9625' SHOULD BE MILLING ON PACKER RUBBERS NOW.
RECEIVED
MAR 28 1995
A~,~sk~ Oil & Gas Cons. Commission
Anchor~ '-
WELL : E-09A
OPERATION:
RIG : DOYON 14
PAGE: 2
12/24/94 ( 5)
TD:10986' ( 0)
12/25/94 ( 6)
TD:10986' ( 0)
12/26/94 ( 7)
TD: 10569' ( 0)
12/27/94 ( 8)
TD:10630' ( 61)
12/28/94 (9)
TD: 10630' ( 0)
POH'FOR SPEAR MW: 0.0 VIS: 0
CIRCULATE BOTTOMS UP, TRIP FOR NEW MILL. POH DUMP BOOT
BASKETS, CHANGE MILL, P/U 8 JT'S OF 5" HWDP. RIH TO 9619'.
CONTINUE MILLING ON 9 5/8" X 4" TIW HBBP PKR W/ MILL #2 F/
9619 - 9624' CIRCULATE BOTTOMS UP AND CHECK FOR FLOW.
POH FOR SPEAR.
P/U BIT & SCRAPER MW: 0.0 VIS: 0
CONTINUE TO POH L/D MILL AND BOOT BASKETS. P/U SPEAR W/
3.947" GRAPPLE, EXTENSION, 2 X/O, BUMPER SUB, JARS 9- 6
3/4" DC'S, 18- 5" HWDP RIH. SLIP AND CUT DRLG LINE.
CONTINUE RIH W/ SPEAR TO 9624' STAB INTO FISH P/U WEIGHT,
PACKER FREE. CIRCULATE OUT MARASEAL AND CLEAR GAS BUBBLE
FROM ANNULUS, CLOSED BAG AND CIRCULATED THROUGH POOR BOY
DEGASSER, CONTINUE CIRC GETTING MARASEAL, CHECK FOR FLOW.
POH W/ FISH L/D FISHING TOOLS W/ TIW 9 5/8" X 4" PACKER.
L/D 30 JTS OF 4 1/2" 12.6# L-80 TDS TBG, AND CUT OFF. RIH
W/ 9- 6 3/4" DC'S AND 18- 5" HWDP, L/D SAME. P/U RR 6" BIT,
7" CSG SCRAPER, BIT SUB, 8- 4 3/4" DC'S, JARS, 6- 4 3/4"
DC'S X/O, RIH.
CUTTING 7" SECTION @ 10569' MW: 0.0 VIS: 0
CONTINUE P/U 3 1/2" DP, RIH W/ RR 6" BIT, 7" CSG SCRAPER,
BIT SUB, 8- 4 3/4" DC'S, JARS, 6- 4 3/4" DC'S, X/O ON 5" DP
TO 10730'. CIRCULATE AND CLEAR BORE HOLE OF MARASEAL,
CONDITION MUDD. CHECK FOR FLOW, POH FOR 7" SECTION MILL,
L/D BIT AND CSG SCRAPER. P/U 7" SERVCO 5500 SECTION MILL
BHA, RIH TO 10558'. MILL 7" SECTION F/ 10558 - 10569'.
RIH TO LAY KICK OFF PLUG MW: 0.0 VIS: 0
CONTINUE TO MILL 7" SECTION F/ 10569 - 10630'. TOTAL
WINDOW 72' F/ 10558 - 10630' CIRCULATE AND CLEAN HOLE.
FHECK FOR FLOW, PULL 10 STANDS, CHECK FOR FLOW, POH L/D 4
3/4" DC'S AND SECTION MILL. M/U 3 1/2" MULE SHOE ON 3 1/2"
DP STINGER 1040' RIH TO LAY KICK OFF PLUG ACROSS 7" WINDOW
F/ 10558 - 10630'.
RIH W/ 6" BHA MW: 0.0 VIS: 0
CONTINUE TO RIH W/ OPEN ENDED DP TO 10721'. REVERSE
CIRCULATE AND CLEAN WHILE BATCH MIXING CEMENT. PUMP 20
BBLS WATER, TEST LINES. PULL 11 STANDS DP. CIRCULATE PIPE
AT 10 BPM TO CLEAN DP. SQUEEZE CEMENT, NO FLUID LOSS. POH
L/D 60'JTS 5" DP. WASH OUT STACK W/ WASHING TOOL, AND PULL
WEAR BUSHING. P/U 3- 6 1/4" DC'S PULL 9 5/8" X 13 3/8"
PACK OFF AND REPLACE, L/D DC'S. ETST BOP'S AND MANIFOLD.
RUN WEAR BUSHING. P/U DRILLING BHA #1 ADJUST MOTOR TO 2
DEGREE AND ORIENT. RIH W/ BHA #1. CIRCULATE EVERY 1000"
TO CLEAR MOTOR.
RECEIVED
MAR 2.8 i995
Abska Oil & Gas Cons. Commission
Anchor[., ,-
WELL : E-09A
OPERATION:
RIG : DOYON 14
PAGE: 3
12/29/94 (10)
TD:10810' ( 180)
12/30/94 (11)
TD:lll31' ( 321)
12/31/94 (12)
TD:t1422' ( 291)
01/01/95 (13)
TD:10700' ( 0)
01/02/95 (14)
TD:10973' ( 273)
01/03/95 (15)
TD:l1290' ( 317)
DRLG & SURVEYS MW: 0.0 VIS: 0
CONTIUE TRIP IN HOLE TO 9017'. CUT AND SLIP 59.5' DRLG
LINE. CONTINUE TRIP IN HOLE TO 10313' AND WASH TO TOP OF
CEMENT @ 10369'_ DRLG FIRM CEMENT F/ 10369 - 10580'. KICK
OFF OUT WINDOW F/ 10580 - 10727'. PASSED STUMP. PUMP 40
BBL HI VIS SPACER AND DISPLACE WELL TO FLO PRO MUD.
DIRECTIONAL DRILL AND SURVEYS F/ 10727 - 10810'.
DRILLING MW: 0.0 VIS: 0
DRLG AND SURVEYS F/ 10810~- 11027'. CIRC BOTTOMS UP. 10
MIN FLOW CHECK, PULL TO SHOE, 10 MIN FLOW CHECK, POH FOR
NEW BIT AND BHA CHANGE. PULL MUD PROBE, CHANGE BIT, ADJUST
MOTOR TO 1.5 DEGREES. RIH W/ NEW BIT, CHECK MWD AND FILL
PIPE @ 6500 AND 10530' WASH THRU TIGHT SPOT @ 10727 -
10758' FINISH RIH. DRLG AND SURVEYS F/ 11027 - 11131'
POH F/ NEW BIT MW: 0.0 VIS: 0
DRLG AND SURVEYS F/ 11131 - 11422' ANGLE BIT BACK UP TO
SAND. CIRCULATE BOTTOMS UP.' CHEC~ FOR FLOW, POH TO SHOE,
CHECK FOR FLOW, POH FOR NEW BIT.
POH F/ NEW BIT ' MW: 0.0 VIS: 0
FINISH POH FOR NEW BIT. WHILE OUT OF HOLE, RECEIVED ORDERS
TO PLUG BACK, MOVE BHA IN DERRICK, MAKE UP 3.5" MULE SHOE
AND RIH PICKING UP 41 JTS 3.5" DP OFF RACK AND RIH TO
11420. CIRC SHILE RIGGING UP BJ CEMENTERS AND BATCH MIX
CEMENT. LAY 150 SX CLASS 'G' CEMENT PLUG. PULL 9 STANDS
DP TO SHOE, TIGHT F/ 10850 - 10680'. REVERSE CIRC CAPACITY
OF DP. PULL 8 STAND TO TOP OF 7" LINER. PRESSURE TO 1000#
ON CEMENT, HOLD. POH FOR NEW BHA. LAY DOWN 25 JTS 5" AND
41 JTS 3.5" DP.
RIH WITH NEW BHA MW: 0.0 VIS: 0
ADJUST MOTOR TO 1.75 DEGREE. INSTALL MWD PROBE, RIH TO
9685'.' CUT DRLG LINE. PRESSURE TO 500# ON CEMENT AND HOLD
SAME. RIH TO 10553'. WASH AND REAM F/ 10553 TO TOP OF
CEMENT @ 10740'. DRLG FIRM CEMENT F/ 10740 - 10860'. DRLG
AND SURVEYS F/ 10860 - 10973'. CBU F/ TRIP. 10 MINUTE
FLOW CHECK. POH 5 STANDS, 10 MINUTE FLOW CHECK, POH F/
MOTOR CHANGE. HAD INSUFFICIENT BUILD RATE. CHANGE MOTORS
AND SET TO 2.25 DEGREE AND RIH. EFC ESTIMATED AT $1.9M PER
STEVE SHULTZ.
DRILLING MW: 0.0 VIS: 0
FINISH RIH W/ 2.25 DEGREE MOTOR & NEW BIT. DRLG AND
SURVEYS F/ 10973 - 11075' CIRC BOTTOMS UP. 10 MINUTE
FLOW CHECK, PULL 5 STANDS, 10 MINUTE FLOW CHECK AND POH FOR
MOTOR ADJUSTMENT, CHANGE MUD PROBE, ADJUST MOTOR TO 1.5
DEGREE AND RIH. DRLG AND SURVEYS F/ 11075 - 11290'.
MAF 2.8 1995
Oil & Gas Cons. Commission
Anchor[ -
WELL : E-09A
OPERATION:
RIG : DOYON 14
PAGE: 4
01/04/95 (16)
TD:11443' ( 153)
01/05/95 (17)
TD:11443' ( 0)
01/06/95 (18)
TD:11995' ( 552)
01/07/95 (19)
TD:11995' ( 0)
01/08/95 (20)
TD: 11995' ( 0)
01/09/95 (21)
TD:11995' ( 0)
POH F/ SMALLER OVERSHOT MW: 0.0 VIS: 0
DRLG AND SURVEYS F/ 11304 - 11443'. LOST 800# PUMP
PRESSURE, CHECK SURFACE EQUIPMENT, OK. 10 MINUTE FLOW
CHECK PULL 10 STANDS 10 MINUTE FLOW CHECK, POH. SLIP AND
CUT DRLG LINE. LAY DOWN MWD, 1 NMHWDP, XO AND SERVICE RIG.
MAKE UP OVERSHOT AND RIH TO 10874', HIT BRIDGE @ 10874'
·
PICK UP KELLY AND ATTEMPT TO WORK THRY TIGHT SPOT W/ NO
SUCCESS. ASSUME 5 3/4" OVERSHOT 8' LONG TO AGRESSIVE TO GO
AROUND DOGLEGS. 10874' IS APPROX IN AREA OF LAST KICKOFF.
CHECK F/ FLO AND POH. TIGHT SPOTS UP TO 10650'
RIH W/RR#3
MW: 0.0 VIS: 0
POOH & LD 5-3/4" FISH ASSY. MU 4-3/4" ASSY & RIH T/11186.
WASH T/TOP OF FISH @11427, WORK OVER SAME T/11433. POOH
W/FISH & LD SAME. - FULL RECOVERY. MU BHA #6 & RIH T/5577.
REPAIR BRAKES & CHANGE OUT THE BRAKE BLOCKS. RIH W/BIT #3.
LD BHA
MW: 0.0 VIS: 0
FINISH RIH WAS 50' T/BTTM. - NO FILL. MAD PASS F/TIE-IN
T/11443. DRGL & SURV. F/11443 T/11995. CBU. 10-MIN. FLOW
CHECK. POOH T/SHOE, 10-MIN FLO-CHK. POOH & LD 40 JTS & BHA
BELOW JARS. ~ -
RU SIDE ENTRY SUB & REPAIR W/L MW: 0.0 VIS: 0
FINISH LD BHA. PULL WEAR RING & TEST BOPE 250-5000E RUN
WEAR RING. MAKE UP BHA & RIH TO 3100. CUT & SLIP DRLG
LINE. CONTINUE RIH. PLUGGED HOLE OPENER - ATTEMPT TO
UNPLUG SAME - NO SUCCESS. POH - HOLE OPENER PLUGGED
W~METAL SHAVINGS. PRE JOB SAFETY MEETING W/ATLAS WIRE LINE
- PICK UP ATLAS LOGGING TOOLS & TEST SAME. RIH PICK UP 35
JTS 3.5" DP OFF RACK. RIGGING UP SIDE ENTRY SUB & REPAIR
WIRELINE.
REAMING W/HOLE OPENER MW: 0.0 VIS: 0
REPAIR WIRE LINE & RIG UP SIDE ENTRY SUB. DRILL PIPE
CONVEYED LOGGING F/10549-11986'. POH W/WIRE LINE TOOLS.
LAY DOWN WIRE LINE TOOLS UNLOAD SOURCES. MAKE UP BHA - RIH
TO 10558. OPEN HOLE F/10558-11204.
RIG UP TO RUN 5" LINER MW: 0.0 VIS: 0
REAMING HOLE W/6" HOLE OPENER F/11204 TO 11995'. CIRC.
HOLE CLEAN. CHECK F/FLOW WIPER TRIP TO SHOE TIGHT @ 11200
RIH. CIRC. HOLE CLEAN-PUMP HI-VIS SWEEP AROUND & SPOT
HI-VIS SWEEP. CHECK F/FLOW & POH TO SHOE. DISPLACE MUD IN
HOLE W/SEAWATER @ 8.5 BPM TO LOWER HYDROSTATIC PRESSURE ON
FORMATION. CLEAN UNDER SHAKERS & TROUGH & CUT DRLG LINE.
CHECK F/FLOW-DROP DRIFT POH-LAY DOWN 3.5" DP & BHA. RIG UP
TONGS & FLOOR TO RUN 5" LINER.
RECEIVED
MAR 2 8 1995
~iask~ Oil & Gas Cons. Commission
Anchor~. ·
WELL : E-09A
OPERATION:
RIG : DOYON 14
PAGE: 5
01/10/95 (22)
TD:11995
PB:l1908
01/11/95 (23)
TD:11995
PB:l1908
01/12/95 (24)
TD:11995
PB:l1908
01/13/95 (25)
TD:11995
PB:l1908
P/U 3-1/8" ASSY MW: 0.0
PICK UP & MAKE UP 57 jTs. 5" 14.873 13CR STL CSG. -HANGER &
PACKER. CIRC COMPLETE VOLUME OF CSG. RUN LINER IN HOLE TO
SHOE ON 5" DP. FILL EVERY 10 STANDS. CIRC COMPLETE VOLUME
OF DP & CSG. MAKE UP CMT HEAD. RUN LINER THRU OPEN
HOLE-TAG BOTTOM @ 11995 & PICK UP 2' RIG UP BJ BBL.
COUNTER & HOSE & CIRC. WHILE BATCH MIX CMT. PUMP 70 BBLS.
WATER AHEAD - TESTED LINES TO 4000# - PUMPED 250 SX CLASS G
CMT - DROP WIPER PLUG & DISPLACE W 209 BBLS SEAWATER. BUMP
PLUG 2/3500# - GLOATS HELD OK. -SET HANGER & PACKER - TOP
OF LINER @ 9537. SHOE @ 11993. RELEASE FROM LINER &
REVERSE OUT-RECOVERED 10 BBLS CMT. POH W/SETTING TOOL.
PICKING UP 3-1/8" BHA F/CLEAN OUT IN 5" LINER.
RIH W/PERF ASSY MW: 0.0
MAKE UP 2-7/8" DP. RIH W/ 2-7/8" DRLG ASSY - TAG CMT @
11875'. DRLG OUT CMT TO LANDING COLLAR @ 11906' TEST CSG
& LINER TOP TO 3500# 30 MINS. OK. CIRC HOLE CLEAN.
REVERSE CIRC. & DISPLACE CLEAN SEAWATER TO HOLE. POH LAY
DOWN 14 JTS. 2-7/8" DP & 15 3-1/8" DC, S. PICK UP & MAKE
UP PERFORATING ASSY & RIH.
POOH W/5" 15# CSG SCRAPER BHA MW: 0.0
CONT TO M/U AND RIH W/WESTERN ATLAS 3-3/8" 4SPF ALPHA JET,
DP CONVEYED GUNS AND HALLIBURTON 9-5/8" CHAMP PKR. RIH
9450' CLOSE FAST FILL VALVE, TEST W/200 PSI ON BACK SIDE
O.K. CONTINUE RIH TO 11906' TAG LANDING COLLAR PICK UP 3'
SET CHAMP PKR @9844'. R/U HALLIBURTON TEST SURFACE LINES
TO 3000 PSI O.K. SHOOT FLUID LEVERL @ 1639' FOR 500 PSI
UNDER BALANCE. PRESSURE ANNULUS TO 2100 PSI FIRE GUNS,
GUNS FIRED @ 1120 HRS GOOD INDICATION CLOSED TOOL AT 1124
HRS AND PULLED LOOSE, GUNS FREE RESET PACKER. REVERSE CIRC
FULL PIPE VOLUME. R/D SURFACE EQUIP. POOH L/D FAST FILL
VALVE, PACKER, STAND BACK 2-7/8" DP L/D GUNS ALL GUNS
FIRED. M/U 4-1/8" MILL ON 5" CSG SCRAPER AND P/U 6-3 1/8"
DC'S RIH TO 5600' SLIP AND CUT DRLG LINE 59.5'. CONTINUE
RIH TO 11200'. CBU. POOH TO RUN 5" ISOLATION PACKER.
RUNNING 4.5" TBG COMPLETION MW: 0.0 '
CONTINUE TO POOH STAND BACK 5" & 2-7/8" DP & DRIFT TO
1-7/16" L/D 3-1/8" DC'S & 5" SCRAPER. M/U BAKER 5" X
2-7/8" MODEL "D" ISOLATION PKR W/ 2-7/8" TAIL PIPE ASSY AND
RIH ON 2-7/8" & 5" DP TO 11080' TOP 11125' BTM. DROP BALL
AND SET 5" ISOLATION PKR @ 11080', 2-7/8 .... SN" NIPPLE @
11117', 2-7/8" WLEG @ 11125'. P~OH STAND BACK 50 STANDS 5"
DP FOR NEXT WELL, L/D 5" & 2-7/8 DP BAKER RUNNING TOOLS.
PULL WEAR RING AND R/U TO RUN 4.5" TBG COMPLETION. RUNNING
4.5" 12.6# L-80 NSCT NEW TBG COMPLETION, BE AT BVN ABOUT
0600 HRS.
RECEIVED
~,4AR 2.. 8 '1995
Aiaska Oil &'Gas Cons. Commission
Anchor~ '.
WELL : E-09A
OPERATION:
RIG : DOYON 14
PAGE: 6
01/14/95 (26)
TD:11995
PB:11908
WELL COMPLETED MW: 0.0
CONTINUE RUNNING 4.5" 12.6# L-80 NSCT NEW TBG 225 JT'S, 3
BLM'S, BVN, & 9-5/8" X 4" TIW HBBP PKR COMPLETION. SPACE
OUT TO LAND TBG 5' INSIDE 5" LINER TIE BACK SLEEVE W/TBG
TAIL @ 9542', INSTALL HGR AND TEST CONTROL LINES TO 5000
PSI O.K. CIRCULATE 7726 INHIBITOR 25 GL'S PER/100 BBL'S.
LAND TBG INSTALL TWO WAY CHECK, N/D BOP'S. N/U NEW 4" XMAS
TREE AND TEST TO 5000 PSI O.K. R/U LUBRICATOR AND PULL TWO
WAY CHECK. R/U LINES AND DROP BALL SET PACKER W/RIG PUMP,
PRESSURED UP TO 4000 PSI AND HELD FOR 30 MIN O.K. BLEED
BACK TO 150 PSI. CHANGE LINES R/U LITTLE RED HOT SERVICE
AND TEST 9-5/8" X 4.5" ANNULUS TO 3500 PSI FOR 30 MIN O.K.,
BLEED OFF TO 2500 PSI, BLEED TBG PRESSURE TO "0", PRESSURED
ANNULUS TO 3200 PSI SHEARED "RP" VALVE W/LITTLE RED AND
PUMPED 150 BBL'S DIESEL DOWN ANNULUS. HOOK UP AND "U-TUBE"
TO TBG TILL BALANCED. INSTALL BPV AND SECURE WELL CLEAN
PITS AND PUMP OUT WATER. RELEASE RIG FOR TURN KEY RIG MOVE
(WELL TO WELL) @ 2400 HRS 1/13/95o RIG MOVING TO E-19A.
SIGNATURE:
(drilling superintendent)
DATE:
RECEIVED
MAR 28 199~
bit & Gas Cons. Commission
Anchor~
SPE .... 5-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/E-09A
500292046601
NORTH SLOPE
COMPUTATION DATE: 2/22/95
DATE OF SURVEY: 01/06/95
MWD SURVEY
JOB NTJMBER: AK-MW-40096
KELLY BUSHING ELEV. = 65.10
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
10504 8616.09 8550.99
10563 8661.89 8596.79
10682 8748.41 8683.31
10713 8767.60 8702.50
10745 8786.45 8721.35
38 27 S 74.90 E .00 731.10S 4724.24E
37 50 S 74.49 E 1.12 740.60S 4758.94E
49 35 N 88.20 E 13.96 749.03S 4840.32E
53 0 N 84.00 E 15.38 747.38S 4864.21E
55 35 N 82.00 E 9.49 744.18S 4890.24E
4755.14
4790.27
4871.98
4895.75
4921.59
10775 8803.00 8737.90
10806 8818.84 8753.75
10837 8833.09 8767.99
10860 8842.87 8777.77
10866 8845.54 8780.44
57 42 N 78.90 E 11.08 740.00S 4915.03E
60 35 N 77.30 E 10.38 734.52S 4940.98E
63 42 N 75.80 E 11.05 728.25S 4967.20E
65 59 N 73.22 E 14.22 722.68S 4987.26E
64 35 N 74.40 E 27.42 721.06S 4992.84E
4946.13
4971.78
4997.65
5017.40
5022.89
10897 8858.29 8793.19
10928 8870.40 8805.30
10961 8881.84 8816.74
10992 8890.79 8825.69
11023 8897.06 8831.96
66 41 N 70.80 E 12.58 712.64S 5019.70E
68 0 N 72.40 E 6.28 703.48S 5047.22E
70 48 N 70.70 E 9.91 693.85S 5076.09E
75 35 N 70.40 E 15.51 683.97S 5104.06E
81 11 N 70.70 E 17.99 673.81S 5132.84E
5049.29
5076.32-
5104.65
5132.09
5160.32
11053 8899.98 8834.88
11084 8900.37 8835.27
11116 8899.62 8834.52
11147 8898.69 8833.59
11177 8897.61 8832.51
87 30 N 71.90 E 21.58 664.34S 5160.83E
91 5 N 71.40 E 11.57 654.45S 5190.65E
91 35 N 71.60 E 1.71 644.45S 5220.53E
91 48 N 71.20 E 1.43 634.47S 5250.18E
92 18 N 72.00 E 3.12 624.94S 5278.83E
5187.80
5217.08
5246.42
5275.53
5303.65
11209 8896.32 8831.22
11239 8895.28 8830.18
11271 8894.20 8829.10
11301 8892.34 8827.25
11333 8890.15 8825.05
92 24 N 71.80 E .71 615.14S 5308.80E
91 30 N 70.80 E 4.40 605.35S 5337.75E
92 24 N 71.60 E 3.81 595.16S 5367.66E
94 35 N 69.40 E 10.22 585.03S 5396.28E
93 18 N 67.40 E 7.46 573.31S 5425.87E
5333.09
5361.51
5390.87
5418.94
5447.90
11365 8888.06 8822.96
11397 8885.74 8820.64
11427 8883.49 8818.39
11458 8881.43 8816.33
11488 8880.53 8815.43
94 5 N 68.30 E 3.72 561.16S 5455.73E
94 18 N 69.00 E 2.29 549.63S 5485.22E
94 24 N 67.50 E 5.06 538.68S 5512.66E
93 3 N 67.20 E 4.34 526.53S 5541.79E
90 24 N 67.60 E 9.00 515.05S 5569.36E
5477.11
5505.98
5532.83
5561.31
5588.27
11519 8880.31 8815.21
11550 8880.23 8815.13
11582 8880.48 8815.38
11612 8880.79 8815.69
11643 8881.11 8816.01
90 24 N 67.30 E .98 503.27S 5597.73E
89 54 N 67.50 E 1.73 491.34S 5626.39E
89 11 N 66.90 E 2.92 479.10S 5655.51E
89 37 N 65.30 E 5.41 466.69S 5683.51E
89 10 N 66.00 E 2.78 454.25S 5710.99E
5616.00
5644.03
5672.50
5699.83
5726.64
.
"-- ~,!~$M Oil & Gas Cons. Commission
Anchor~
SPA. xY-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/E-09A
5oo292o466o1
NORTH SLOPE
COMPUTATION DATE: 2/22/95
DATE OF SURVEY: 01/06/95
MWD SURVEY
JOB NUMBER: AK-MW-40096
KELLY BUSHING ELEV. = 65.10
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
11674 8881.57 8816.47 89 8 N 66.70 E 2.23 441.66S 5739.74E 5754.72
11705 8881.96 8816.86 89 25 N 65.20 E 4.98 429.17S 5767.73E 5782.05
11736 8882.05 8816.95 90 14 N 65.60 E 2.89 416.03S 5796.44E 5810.05
11767 8881.90 8816.80 90 20 N 65.80 E .73 403.40S 5824.41E 5837.35
11797 8881.67 8816.57 90 31 N 64.50 E 4.31 390.61S 5852.03E 5864.29
11828 8881.39 8816.29 90 29 N 64.10 E 1.29 377.14S 5880.02E 5891.56
11860 8881.07 8815.97 90 42 N 64.50 E 1.45 363.49S 5908.38E 5919.19
11896 8880.58 8815.48 90 51 N 64.20 E .94 347.99S 5940.65E 5950.65
11926 8880.10 8815.00 90 55 N 64.00 E .68 334.69S 5968.04E 5977.33
11956 8879.41 8814.31 91 45 N 64.30 E 2.97 321.72S 5994.81E 6003.41
11995 8878.23 8813.13 91 45 N 64.30 E .00 304.96S 6029.64E 6037.35
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 6037.35 FEET
AT SOUTH 87 DEG. 6 MIN. EAST AT MD = 11995
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 92.90 DEG.
TIE IN POINT 10504.76'
WINDOW POINT 10563'
KICK OFF POINT 10860'
INTERPOLATED DEPTH 11995'
RECEIVED
MAR 2.8 !995
A!~sk~ Oil & Gas Cons. Commission
Anchor~
SPE~-. °K-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
~HARED SERVICES DRILLING
PBU/E-09A
500292046601
NORTH SLOPE
COMPUTATION DATE: 2/22/95
DATE OF SURVEY: 01/06/95
JOB NUMBER: AK-MW-40096
KELLY BUSHING ELEV. = 65.10 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
10504 8616.09 8550.99 731.10 S 4724.24 E 1888.67
11504 8880.42 8815.32 508.99 S 5584.05 E 2624.34 735.67
11995 8878.23 8813.13 304.96 S 6029.64 E 3116.77 492.43
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
RECEIVED
MAR 28 1995
Ai~ska (JJi & Gas Coris. Commission
Anchor~
SPE. _~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/E-09A
500292046601
NORTH SLOPE
COMPUTATION DATE: 2/22/95
DATE OF SURVEY: 01/06/95
JOB NUMBER: AK-MW-40096
KELLY BUSHING ELEV. = 65.10
OPER3tTOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
10504 8616.09 8550.99 731.10 S 4724.24 E 1888.67
10567 8665.10 8600.00 741.22 S 4761.41 E 1902.00 13.33
10709 8765.10 8700.00 747.65 S 4861.02 E 1944.04 42.04
10914 8865.10 8800.00 707.47 S 5034.99 E 2049.73 105.69
10944 8876.22 8811.12 698.87 S 5061.42 E 2068.54 18.81
THE CALCULATION PROCEDURES USE A LINEAR INTERPOI~ATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
RECEIVED
MAR 28 1995
Oil & Gas Cons. Commission
Anchor-:
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 1
SPLARED SERVICES DRILLING
PBU/E- 09A~ST
500292046670
NORTH SLOPE
COMPUTATION DATE: 2/22/9
DATE OF SURVEY: 010695
MWD SURVEY
JOB NUMBER: AK-MW-40096
KELLY BUSHING ELEV. = 65.10 FT.
OPER3kTOR: BP EXPLORJkTION
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
10504 8616.09 8550.99 38 27 S 74.90 E .00 731.10S 4724.24E
10563 8661.89 8596.79 37 50 S 74.49 E 1.12 740.60S 4758.94E
10682 8748.41 8683.31 49 35 N 88.20 E 13.96 749.03S 4840.32E
10713 8767.60 8702.50 53 0 N 84.00 E 15.38 747.38S 4864.21E
10745 8786.45 8721.35 55 35 N 82.00 E 9.49 744.18S 4890.24E
4772.10
4807.54
4889.36
4912.98
4938.60
10775 8803.00 8737.90 57 42 N 78.90 E 11.08 740.00S 4915.03E
10806 8818.84 8753.75 60 35 N 77.30 E 10.38 734.52S 4940.98E
10837 8833.09 8767.99 63 42 N 75.80 E 11.05 728.25S 4967.20E
10867 8845.91 8780.81 66 45 N 72.40 E 14.20 720.63S 4993.91E
10901 8858.60 8793.50 69 21 N 70.60 E 9.10 710.63S 5023.78E
4962.88
4988.20
5013.72
5039.59
5068.38
10932 8868.63 8803.53 72 32 N 68.60 E 12.04 700.50S 5051.00E
10962 8876.71 8811.61 76 29 N 67.40 E 13.61 689.58S 5078.01E
10982 8881.20 8816.10 77 40 N 67.10 E 6.05 682.00S 5096.09E
10995 8883.88 8818.78 77 31 N 66.70 E 3.36 677.23S 5107.28E
11028 8891.13 8826.04 77 27 N 67.00 E .89 664.37S 5137.35E
5094.53
5120.39
5137.67
5148.36
5177.09
11054 8896.32 8831.22 79 16 N 67.00 E 7.04 654.54S 5160.52E
11085 8901.38 8836.28 82 5 N 66.10 E 9.48 642.25S 5188.85E
11114 8904.83 8839.73 84 22 N 67.00 E 8.33 630.68S 5215.51E
11148 8907.59 8842.49 86 14 N 67.80 E 6.03 617.76S 5246.55E
11179 8909.10 8844.00 88 15 N 69.20 E 7.83 606.31S 5275.63E
5199.23
5226.28
5251.73
5281.42
5309.28
11210 8909.81 8844.71 89 4 N 68.40 E 3.73 595.15S 5304.40E
11241 8910.17 8845.07 89 35 N 68.60 E 1.80 583.84S 5333.13E
11276 8909.73 8844.63 91 52 N 69.20 E 6.83 571.46S 5365.19E
11305 8907.99 8842.89 95 0 N 69.60 E 10.91 561.27S 5392.30E
11336 8904.97 8839.87 96 0 N 69.20 E 3.43 550.27S 5421.57E
5336.87
5364.41
5395.17
5421.20
5449.30
11367 8901.56 8836.46 96 40 N 69.00 E 2.26 539.32S 5450.26E
11422 8894.64 8829.54 97 51 N 68.64 E 2.26 519.73S 5500.79E
THE CALCULATION PROCEDURES ARE BASED
THREE-DIMENSION MINIMUM CURVATURE
ON THE USE OF
METHOD.
5476.83
5525.29
HORIZONTAL DISPLACEMENT = 5525.29 FEET
AT SOUTH 84 DEG. 36 MIN. EAST AT MD = 11422
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 95.40 DEG.
HICIZOFILHED
TIE IN POINT 10504.76'
WINDOW POINT 10563'
INTERPOLATED DEPTH 11422'
RECEIVED
MAP, 2. 8 !995
~,ska. Oil & Gas Cons. Commission
Anchor; ~
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/E-09A ST
500292046670
NORTH SLOPE
COMPUTATION DATE: 2/22/95
DATE OF SURVEY: 010695
JOB NUMBER: AK-MW-40096
KELLY BUSHING ELEV. = 65.10 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
10504 8616.09 8550.99
11422 8894.64 8829.54
731.10 S 4724.24 E 1888.67
519.73 S 5500.79 E 2527.36 638.69
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHOR. AGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/E- 09A ST
500292046670
NORTH SLOPE
COMPUTATION DATE: 2/22/95
DATE OF SURVEY: 010695
JOB NUMBER: AK-MW-40096
KELLY BUSHING ELEV. = 65.10
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
10504 8616.09 8550.99 731.10 S 4724.24 E 1888.67
10567 8665.10 8600.00 741.22 S 4761.41 E 1902.00
10709 8765.10 8700.00 747.65 S 4861.02 E 1944.04
10921 8865.10 8800.00 704.30 S 5041.03 E 2055.95
13.33
42.04
111.91
10944 8872.21 8807.10 696.09 S 5062.10 E 2072.55
16.60
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
RECEIVED
MAR 28 1995
Oil & Gas Cons. Commission
Anchor~
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 14 February 1995
RE: Transmittal of Data
Sent by: ANCH.EXPRESS
Dear Sir/Madam,
-
Enclosed, please find the data as described below:
WELL
S-17A
DESCRIPTION
1 PLS/STP FINAL BL+RF
1 PLS FINAL BL+RF
1 GR/CCL'FINAL BL+RF
1 POL/CCL FINAL BL+RF
ECC No.
Run # 1 1214.05
Run # 1 6340.01
Run # 1 6365.00
Run # 1 6365.01
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by:
Date:
r-.:..¥~.-.-k~:,~:-: c~! Da.'ta Ce~+~-~-
~57 ~:2-':_. _-'.'3.':: ::::.2. f. o n
~ :3 C :.: ":: :, :-: '2.-,~'n r-~ c.n '2 :~':-'-. ~.. c.':: :-~ :!' &
· . ,~. -~ - ..,-, ,-- ,- >. ': ,q c-~' ..~ C'-'.."':-~ '~ '~': , .
E C E IV E D
---~. -~FEB 1 ? 1995
Alaska Oil & Gas Cons. Commission
Anchorage
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, . 99501.
Dear Sir/Madam,
Reference:
BP
E-09A
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes: 1
DLL/CN/GR TAPE+LIS
Date:
RE:
16 January 1995
Transmittal of Data
ECC #: 6340.00
Sent by: MAIL
Data: LDWG
Run # 1
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by:
Date:
Please s!~ and return
RECEIVED
JAN 2 O 1995
Alaska 0il & Gas Oons..Commi.~lo_fl
Anchorage
RECEIVED
JAN 2_. b 1995
Alaske, Oil & Gas I:;ons. CommissiOn
An~;homgo
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 13 January 1995
RE: Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
1 DIFL/GR/SP FNL BL+RF
1 BHC/AC-GR FNL BL+RF
1 FMT-GR FINAL BL+RF
1 DLL/GR/SP FNL BL+RF
1 BHC/AC-GR FNL BL+RF
1 CN/GR FINAL BL+RF
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run ~ 1
ECC No.
6339.00
6340.00
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
ReceiVed by:
Date:
ALASKA OIL AND GAS
CONSERVATION COMMISSION
November 23, 1994
Adrian Clark
Drilling Engineer Supervisor
BP Exploration (Alaska), Inc.
P O Box 196612
Anchorage, AK 99519-6612
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
Re:
Prudhoe Bay Unit E-09A
BP Exploration (Alaska), Inc.
Permit No: 94-148
Sur. Loc. 243'SNL, 500'WEL, Sec. 6, TllN, R14E, UM
Btmhole Loc. 609'SNL, 148'EWL, Sec. 4, TllN, R14E, UM
Dear Mr. Clark:
Enclosed is the approved application for permit to drill the above
referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE
test performed before drilling below the surface casing shoe must be
given so that a representative of the Commission may witness the test.
Notice may be given by contacting the Commission petroleum field
inspector on the North Slope pager at 659-3607.
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
~) prir'~ted on recycled p.,3per b y r': ?)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2O AAC 25.005
la. Type of work Drill [] Redril117tllb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil []
Re-Entry [] Deepenl-II Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration KBE = 65.61 feet .. Prudhoe Bay Field/Prudhoe
3. Address !6. Property Designation Bay Pool
P. O. Box 196612. Anchorac~e. Alaska 99519-6612 ADL 28303
4. Location of well at surface /C/cd., 7. Unit or property Name 11. Type Bond(me 2o Mc 25.025)
243' SNL, 500 WEL, SEC. ~ -/'//4,,/. ~ /¢~,z~z" Prudhoe Ba)/ Unit
At top of productive interval / 8. Well number Number
922' SNL, 588' WEL, SEC. 5, T11N, R14E E-OgA (11-4-11-14) 2S100302630-277
At total depth 9. Approximate spud date Amount
609' SNL, 148' EWL, SEC. 4, T11N, R14E 12/6/94 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(MDa, dTVD)
property line
ADL 28304-148 feet No close approach feet 2560 11887'MD/8896' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (me 2o ^^c 25.035 (0)(2))
Kickoff depth ~o~75 feet Maximum hole angle 9o o Maximum sudace 3330 psig At tolal depth (TVD) ~800'/4390 p$ig
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade CoUpling Length M D TVD MD TVD (include stage data)
6" 5" 15# 13CR8O STL 2337' 9550' 7844' 11887' 8896' 23'1 sx Class "G"
19. To be completed for Redrill, Re-entry, and Deepen operations.
Present well condition summary
Total depth: truemeasuredvertical 109899004 feetfeet Plugs (measured) ~ ~ 6 ~ t~ ~
Effective depth' measured 10940 feet Junk (measured)
true vertical 8881 feet .~0~ '~ 7 '[
Casing Length Size Cemented Me~a&~r~ ~L~of~. Oofftl~L~'C-~e rt ical depth
Structural ~At. g5~,~ -~'-, ~lC~0f~- !.~
Conductor 110' 20" x 30" 11.8 cu yds 139' 139'
S u rface 2642' 13-3/8" 2790 cu fl 2671' 2671'
I nte rmedi ate 10184' 9-5/8" 1785 cuft 10213" 8385'
Production
Liner 1271' 7" 253 cuft 9717'- 10988' 7982'-9003'
Perforation depth: measured ~oz,~;~07~o,. 10774..10785.. I07~6'.108~0., 10814..10836,. (all squeezed) 10839-10900' (Open)
true vertical 8749'-8820' (four squeezed intervals) 8822'-8872' (open inte~val) (sub,aa)
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program~
Drilling
fluid
AAC
25.050
c~a~thp-~for~qoir~g i~ J,~e and correct to the best of my knowledge
progr,.a~. I~ Time vs depth plot [] Refraction analysis [] Seabed report[] 20 requirements[]
21. I hereby .,
/ /// ~
!
!
Signed ..? '~ / (.,.. ~,.¢~'_,~ ..~/~'~/./~., Title Drilling Engineer Supervisor Date /////'7
I Commission Use Only / / /
;Permit Number IAPI number jApproval date ISee cover letter
~',~' -//~-~' ~' 150-0.2_.?- 2..4::~ ~¢'G~'-,o/ j ///...oO,3 .-, C/,~?/ Ifor other requirements
Conditions of approval Samples required [] Yes j~No Mud log required []Yes .1~ No
Hydrogen sulfide measures [] Yes ~ No Directional survey required J~ Yes [] NO
Required working pressure for BOP~r. [] 2.M.; 1-13M; .l~![5M; []l OM; []15M;
Other; DavidJ lrl¢'l ~igned By by order of
Approved by W. Johnston Commissioner me comm,ssion Da. tej///--..~..,.~-.,,¢
Form 10-401 Rev. 12-1-85
Submit in triplicate
I Well Name: I E-09A
Redrill Plan Summary
IType of Redrill (producer or
injectorI'
PRODUCER
Surface
Location:
Target Location:
Bottom Hole
Location:
243.6 FNL 500 FEL SEC 6 TWNSHP 11N RANGE 14E
922.5 FNL 588.6 FEL SEC 5 TWNSHP 11N RANGE 14E
609 FNL 148.6 FWL SEC 4 TWNSHP 11N RANGE 14E
AFE 4P8013
Number:
Estimated Start 06DEC94
Date-
J MD'
11,887' I
IRig: I
DOYON RIG #14
Operating days to
complete:
17
ITVD' 1 8896
IKBE' 165-61 I
Well Design (conventional,
slimhole, etc.):
HORIZONTAL SIDETRACK
J Objective'
I SADLEROCHIT
ABNORMAL PRESSURE
Special design
considerations
NONE. NO ABNORMAL PRESSURE ANTICIPATED.
RESERVOIR PRESSURE HIGHLY CONSISTENT IN "E"
PAD AREA AT 3490 PSI _+20 PSI AND CAN BE
SUPPORTED BY MEASUREMENTS IN RECENT
DEVELOPMENT WELLS, E-31, E-32ST, E-23A ST,
AND E-33. FRAC PRESSURE IN RESERVOIR 0.65
PSI/FT.
Mud Program:
An 8.9 - 9.0 pp~ Xanvis polymer mud will be used.
Special design I~
considerations
i~OV -I [ i~)54
Alaska 0Jj & Gas Cons. Commission
Anchor: ~,
Depth Densi PV YP INT 10MIN FL OIL SOLID
(TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S
(PPG) ) , min (%)
KOITM 8.9 10 15 5 10 10 0 5
to to to to to to to to to
TD' 9.1 18 30 15 30 5 0 10
E-09A Redrill Plan Summary Page 1
Directional:
I KOP: 110,575' md
Maximum Hole 90°
Angle:
Close Approach NE~E
Well:
The above listed wells will be secured during the close approach.
Casin 3/Tubing Proqram:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MD/TVD MD/TVD
,
6" 5" 15# 13CR-80 STL 2,337 9550/7844 11887/8896
N/A 4-1/2 12.6 L-80 9550 SURFACE 9550/7844
Cement Calculations:
Liner 5", 15#, 13CR-80, STL
Size:
Basis: 50% open hole excess, 80' shoe joint, 858' liner lap (7"), 167' lap
in 9-5/8", and 150' excess above liner with 5" DP.
Total Cement
Volume-
49 bbl 231 sxs of Class G Blend @ 1.19 ft3/sx
Liner N/A
Size:
Basis: 50% open hole excess, 80' shoe joint, 150' liner lap and 150'
excess above liner with DP.
Total Cement N/A sxs of Class G Blend @ 1.18 ft3/sx
Volume:
,
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and
annular preventer will be installed and is capable of handling maximum
potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
RECEIVED
~0V q 7 ,r,¢,
/ 3,'J L~
Ai~ska 0il & 6as Cons. Commission
Anchor: ,,'.
E-09A Redrill Plan Summary Page 2
SUMMARY PROCEDURE
.
.
3.
4.
5.
6.
7.
8.
,
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Pre-rig work. RU coiled tubing unit. Lay a cement plug starting from PBTD to up inside the
4-1/2" tubing to _+10,750' md. Squeeze down to initiate abandonment of perforations (the
window for the sidetrack inside the 7" liner will be from 10,575' md to 10,625' md. A
minimum of 100' of rathole below the bottom of the window is required for the sidetrack).
Chemical cut tubing at in the middle of the first full joint above _+10,750' md. Chemical
cut the tubing again at _+9,562' md in the middle of the first full joint above the 9-5/8"
packer hookup. Circulate well over to seawater. Freeze protect well with diesel to 2000'
and set a BPV.
Move in drilling rig.
Pull BPV. Circulate diesel freeze protection cap from well and recover for future use.
Install a BPV and tree test plug. Remove the production tree.
Install BOP's and test to 5000 psi. Remove the test plug and BPV.
Pull and lay down the 4-1/2". 12.6#. L-80. TDS tubing.
MU overshot. RIH and engage cut joint. Rotate 18 turns to right and retrieve packer anchor.
MU spear and RIH. Enter packer with spear and spaceout to engage spear in 4.00" bore in
packer hookup. Pull and shear pins. Allow packer element to relax. POOH w/packer hookup
and tubing.
Displace well to FLO-PRO/milling fluid. Cut a 50' section in the 7" casing starting from
about ___10.575'M D.
RIH to PBTD with enough 2-7/8", 8.7#, L-80, DSS-HTC tubing to extend from PBTD to
above the TOL. Spot a balanced cement plug from PBTD to 200' above top of window.
Run in with a 4-3/4" steerable drilling assembly and a 6" bit with gamma ray/directional
MWD. Contact AOGCC to witness tag of cement for abandonment purposes. Dress the cement
to 5' below the section top. Kickoff and if necessary displace well to clean FLO-PRO system.
Continue to directionally drill to TD at ___11,887' md which should yield _+800' of horizontal
section (see attached directional plan).
Make a conditioning trip with a 6" hole-opener for the open hole section and with a 9-5/8"
casing scraper spaced to clean the casing.
Install a 5". 15". L-80 or 1~R-80 . STL ,.gOLID liner with 5" X 9-5/8" packer/hanger.
Space packer / hanger to be set at +_9,550' md.
Cement the liner in place with the total cement volume based upon 50 % open-hole
enlargement plus the 80' shoe volume, 7" lap volume, 9-5/8" lap volume, and 150' excess
on top of the liner with drillpipe in the hole.
Re-test BOP's as needed.
PU 3-1/8" BHA. RIH and cleanout liner. Displace well to seawater.
RIH with drillpipe conveyed perforating assembly and perforate the well. POOH LDDP.
Run the _4-1/2" L-~0 completion string assembly re-using as much of the 4-1/2" tubing
and jewelry that was pulled from the well. Space out and circulate with corrosion inhibitor.
Install a BPV and test plug. Remove BOP's.
Install and test the production tree to 5000 psi. Pull tree test plug and BPV.
Set packer.
Test the tubing x casing annulus to 3500 psi for 30 minutes.
Shear RP valve in the upper GLM and freeze protect the well.
Set a BPV. Release rig.
Complete appropriate documentation and hand-over to Production.
RECEIVED
E-09A Redrill Plan Summary Page 3
J
Prudhoe Day Drilling
Prudhoe Bay Unit
E-PAD
E-09A Wp 16
~r~ETICAL ~
$CA.L~ 50 tr. / tz~
HALLiBURTD~
10/17/114 S,87 ~
e~ k WELL PLAN PROFILE SUMMARY
E~;~'~~r/~/~'~' Start MDiEnd MDjPIonned Activify
; iSto,~"t b~41 {d/curve ~t /Edeg,/lO0' ti {{
i ?orlzont~l .
B~O ~ 11087~ l1887~Hold 90deg. Inclination till TD
~ ~gell to be CoMpleted with 5' F~ush-
,~0~ ~ ~ jJolnt L ....
START DF
~67[~- -- -- ~ --- -- ~3;.~3- ~ ~. KOP / TEE IN /1057537.73' 105.59' 8671 748 S 4766
/
CURVE ~
g70~ ~ 18.00'/100 F~
Z~NE I / !B1083663.10' 8~.17' 8838 746S496M
P~OC I084~63.80' 80.74' 8~41 745S4968
Total Depth 1188790.00' 67.00' BB96 356S5933
X ~
~ ~ON P~: g3.53
800 [ I i i i [ { i ~ i f i i i I i [ , f i i
I OJ
1100-
HORIZONTAL ~ (TRb~g NOI~FH}
SCAL~ 1oo ~ / ~.
~: ~
4000 4100 4~00 4300 4400 4500 4600 4700 4800 4900 5000 5100 ~00 5300 5400 5500 5600 5700 5800 ~ 5900 6000 6100 6~00 6300 6400 6500 660~ 6700 6800 6900
~ 8895.82 J 0ate :// --/~/--~ Verified By :
~4D 11886.87 ASP - X, 664447.00
VS 5941.64I{ Y, 5976819.99 4 ~
N/S 365.72 S { Designed by :~ ,~Z~ Certified By : ~, ~
E/W 5930.38 E EKD Ft., 65.6I'
RECEIVED
Pp udhoe Boy Dm iLll n g
Pr udhoe ]Bo.y Un i t;
E-PAD
E-OgA Wp16
Trove[ling Cyilnde~ - Lecs-t I);~-tance
Ref'erence r~eU. - X~e(]O~i~T)i6 T&D
Pi[ ~?,ec~ons Re[ -to True Nor, th
Ones oz, e -the PEA.SLRED cti~-to, nce
870
24O
7O0
HALLFRURTON
t t/15/g4 t 1:41
EGg
~ E-C8
eQ3
~ E-04
e{]5
e(]6 E-C6
e<Iz E-O~ -.
eOB E-C8
etO E-lO
ell ~i2
el3
et4 ~14
e15 ~t5
e16
e17 ~17
et8
elg Cig
e20 E-,2D
al E~t
E--23 E-23
-2 ~ E-23~
~ E-~
e~_4 E-24
e~5 E-~
E-31 ~ E-3t
E-~ ~ E-~
E-~ ~ E-~
E-~ ~ E-~
E-~ ~ E-~
klO K-tO
K-18 ~10 K-t8 ~
K~VDV~ K~ ~T
K~t~ K~I ~T
K-15 3 K-15 ~
K-16 K-i6
~1 K~I
K~
K~
K~
K~
kll K-it
k12 K-[~
k13 K-J3
k14 K-t4
E~ ~ E~
K~ ~15 K~
K-tg ~ K-[g ~T
K-17 ~10 K-t7 ~
76.3g.~8 ~75/~3 105z5J~ 86.-.-.-.-3g.4~g 17.40
~18 ~ 114~ ~l
~gl ~.~ t~ ~.~ I I.~
~61 ~ I~ ~.~
4~4 ~1~ t~ ~.~
Ht~iO 181.~ 1~ ~.~
~gl ~4.11 1~ ~.~ gAO
~ 13 ~ t~.~ ~.~ 7.~
7t~1~ ~ 1~ ~.~
~ ~4~ 1~ ~.4g
~31~ ~ 1~ ~.4g 1~
~ ~ 1~ ~.4g 13.~
~ ~4 1~.~ ~.~ 13~
~ ~.~ I~ ~.4g 3~
~1.18 ~ Ii~ ~t
~4~ 1~ 11~.~ ~.81 4.~
~4.~ 1~5t t1~ ~1 g. lo
4~ 1~15 II~ ~.81 gAO
~6t.~ 17~ t 1~ ~.8t 5~
~i~11 ~.~ t1~ ~1
- ~ 1~.81 1~ ~.4g
417~ t~ 1~ ~
~ 4g~ 11~ ~1 4. tO
~lg 101~ 1~ ~.~ ~iO
~474.~ 1~.~ 1~ ~i
~4 1~.~ 11~ ~1 1~
~1.15 ~.~ 1~ ~.~
ggl5 _3~_% 10356 8114 63g S 43~1 E
10026 35.g~ 1[]4.178804 654 4444 E
1~14 ~ l~iO ~14 716 S ~ E
ZI]~E 3 104~8 38~ 105.40 8564 727 S 47C8 E
~8/~ l~ ~ 1~ ~ ~S 4~
E
~/ ~ ~ / t~ ~ i~ ~ 7~ S 47~E
t2~t~ ?~
~ I / lB t~ ~tO 81.17 ~ 7~ S ~ E
~ ~ ~4 745~ ~ E
~ ~ tl~ ~ ~ ~ ~4 ~ ~10
To.~,qe4; ~ -D/D ~ EW G-Id X C~Iol Y
IPO_YI3~ 88g~ 484 S 5i14 E G~ 597645~
8896 555 S 5142 E ~ 5976380
8895 484 S 5114 E ~ 5~VG~50
8896 352 S 5gO~ E G7~055 59766CD
P~EPDSED ~
TVD 8863.81
HI) 11886,87
N/S 365.62 S
E/W 5930,31 E
.~'"~ -'~- STATE OF ALASKA
ALASi ~IL AND GAS CONSERVATION COMMISSIO,'
APPLICATION FOR SUNDRY APPR(JVALS
1. Type of Request:
Abandon x Suspend. , . Operation Shutdown ~ Re-enter suspended well..
Alter casing Repair well ~ Plugging x . Time extension ~ Stimulate
Change approved program Pull tubing Variance . .. Perlorate Other x
. Plugback for redrlll
2. Name of Operator
BP Exploration
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
243' SNL, 500' WEL, SEC. 06, T11N, R14E, UPM
At top of productive interval
968' SNL, 1100' WEL, SEC. 05, T11N, R14E, UPM
At effective depth
1034' SNI.., 861' WEL, SEC. 05, T11N, R14E, UPM
At total depth
1056'SNL, 776' WEL, SEC. 05, T11N, R14E, UPM
5. Type of Well:
Development
Exploratory
Stratigraphic
I EV, EI V EIJ
1 7 1994
Alas 'I'~ 0ii & (~as Cons. CommissiOn
'
6. Datum elevation (DF or KB)
KBE ,, 60.26' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
E-09 (41-05-11-14)
9. Permit number
80-42
10. APl number
50- 029-20466
11. Field/Pool
Prudhoe Bay Field/Oil Pool
12. Present well condition summary
Total depth: measured
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth;
true vertical
measured
true vertical
Length
10989 feet Plugs (measured)
9004 feet BKB
10940 feet Junk (measured)
8881 feet BKB
Size Cemented
110' 20 x 30" 11.8 cu yds
2642' 13-3/8" 2790 cu ft
10184' 9-5/8" 1785 cu fl
Measured depth
139'
2671'
10213'
1271' 7" 253cu ft 9717'-10988'
measured 10748'-10770', 10774'-10785', 10796'-10810; 10814'-10836; (all squeezed)
10839-10900'(Open)
true vertical subsea
8749'-8820' (four squeezed intervals) 8822'-8872' (open interval)
Tubing (size, grade, and measured depth) 4-1/'2"L-80 @ 10835'
-.
True vertical depth
BKB
139'
2671'
8385'
7982~9003'
Packers and SSSV (type and measured depth) 9-5/8" TIW HBBP-R packer at 9603; 7" TIW HBBP Packer@ 10816',
4-1/2" SSSV at 2094'
13. Attachments Description summary of proposal _Z__ Detailed operations program ~ BOP sketch
4. Estimated date for commencing operation
11/22__/94
6. If proposal was verbally approved Oil X Gas
Name of approver Date approved Service
7. I hereby cer~ thai the foregoing is ,true and correct to the best of my knowledge.
/~~/"?~ Title Drilling Engineer Supervisor
gned ,, FOR COMMISSION USE ONLY '
15. Status of well classification as:
Suspended~
)nditions of approval: Notify Commission so representative may witness -
Plug integrity ,,,--- 'BOP Test~ Location clearance ~
Mechanical Integrity Test~ Subsequent form required 10- z/O"/'
3roved by order of the Commission
10-403 Rev 06/15/88
Commissioner
Date /I - / ,~' - ~,"f
SUBMIT IN TRIPLICATE
WELL PERMIT CHECKLIST
WELL NAME
GEOL AREA
ADMINISTRATION
1. Permit fee attached .................. N
2. Lease number appropriate ............... N
3. Unique well name and number .............. N
4. Well located in a defined pool ............. N
5. Well located proper distance from drlg unit boundary.. N
6. Well located proper distance from other wells ..... N
'7. Sufficient acreage available in drilling unit ..... N
8. If deviated, is wellbore plat included ........ N
9. Operator only affected party .............. N
10. Operator has appropriate bond in force ......... N
11. Permit can be issued without conservation order .... N
12. Permit can be issued without administrative approval.. N
13. Can permit be approved before 15-day wait ....... N
ENGINEERING
14. Conductor string provided ...............
15. Surface casing protects all known USDWs ......... Y N
16. CMT vol adequate to circulate on conductor & surf csg.. Y
17. CMT vol adequate to tie-in long string to surf csg . . .~Y N
18. CMTwill cover all known productive horizons ...... ~? N
19. Casing designs adequate for C, T, B & permafrost .... ~ N
20. Adequate tankage or reserve pit ............. N
21. If a re-drill, has a 10-403 for abndnmnt been approved. N
22. Adequate wellbore separation proposed ..........
23. If diverter required, is it adequate ........... ~----N~
24. Drilling fluid program schematic & equip list adequate
25. BOPEs adequate .................... - - -
;
26. BOPE p~ess rating adequate; test to ~~ psig.~ N
27. Choke manifold complies w/API ~-53 (May 84) ...... ~ N
28. Work will occur without operation shutdown ....... ~ N
29. Is presence of H2S gas probable ............. Y
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures
31. Data presented on potential overpressure zones .....
32. Seismic analysis of shallow gas zones ..........
33. Seabed condition survey (if off-shore) ........
34. Contact name/phone for weekly progress reports ....
[exploratory only]
GEOLOGY:
ENGINEERING:
COMMISSION:
DWJ
__.
Comments/Instructions:
HOW/jo - A:~FORMS~cheklist rev 03/94
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
~Dfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
6566.00
T. MCGUIRE
D. WESTER
E-09A
500292046601
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
22-JAN-96
MWD RUN 3
T. MCGUIRE
D. HEIM
MWD RUN 4
T. MCGUIRE
D. HEIM
MWD RUN 5
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
T. MCGUIRE
D. HEIM
WELL CASING RECORD
MWD RUN 6
T. MCGUIRE
D. HEIM
6
liN
14E
915
54O
65.10
63.60
30.70
MICROFILM O
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING 6.000 11995.0
REMARKS: MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
ALL RUNS ARE DGWD DIRECTIONAL & GAMMA RAY (SGRD) FROM
THE NGP TOOL.
KICK-OFF POINT FROM ORIGINAL WELL, E-09, IS AT 10560'.
THIS WELL, E-09A, IS FROM MWD RUNS 1, 3, 4, 5, & 6.
KICK-OFF POINT FROM FIRST WELLBORE, E-09A PB1, TO
THIS WELL IS AT 10860'
THE WELL E-09A PB1 IS FROM MWD RUNS 1 & 2.
~ HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 10368.0 11946.0
$
BASELINE CURVE FOR SHIFTS: open hole GR from WALS,
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH GR
10438.5 10442.5
10440.0 10444.0
10442.0 10446.0
10445.5 10449.5
10518.0 10525.5
10543.5 10550.0
10552.0 10559.0
10576.5 10583.0
10610.5 10618.0
10616.0 10623.0
10622.0 10629.0
10623.5 10630.5
10629.0 10636.0
10632.0 10639.5
10650.5 10657.5
10655.0 10662.0
10660.0 10667.5
10662.0 10669.0
10666.0 10673.0
10686.5 10694.5
10700.0 10709.0
10707.0 10715.0
10713.5 10723.0
10717.5 10726.5
10728.0 10738.5
10746.0 10751.5
10748.0 10757.0
10756.5 10766.0
10761.5 10770.0
10772.5 10781.5
10777.5 10786.0
10782.0 10791.0
10790.5 10799.0
10797.5 10805.5
10816.0 10824.0
10837.0 10845.5
10850.5 10859.0
10854.0 10863.0
10857.0 10867.0
10867.0 10875.0
10871.0 10879.0
10874.5 10881.5
10895.5 10903.5
10898.0 10906.0
runs merged.
07-JAN- 95.
EQUIVALENT UNSHIFTED DEPTH
±0906.5
10909.5
10913.0
10921.0
10936.5
10940.0
10946.0
10950.5
10955.5
10959.5
10961.0
10968.0
10980.5
10994.5
11009.5
11035.5
11075.5
11079.5
11084.0
11196.5
11205.0
11242.5
11248.5
11260.5
11262.0
11279.5
11288.0
11293.5
11366.5
11373.0
11391.5
11487.5
11525.5
11599.0
11610.5
11614.0
11618.0
11635.0
11667.0
11671.5
11848.5
11884.5
11886.0
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
10910.0
10915.0
10919.0
10922.5
10931.0
10947.5
10952.0
10955.5
10959.0
10965.0
10968.0
10972.0
10977.0
10988.5
11005.0
11017.5
11039.0
11081.5
11085.0
11089.5
11201.0
11210.5
11245.5
11258.5
11264.5
11266.0
11286.0
11290.5
11297.5
11369.0
11374.5
11395.5
11493.0
11530.5
11602.0
11614.0
11618.0
11622.5
11639.5
11675.5
11681.0
11852.5
11889.5
11891.0
BIT RUN NO MERGE TOP MERGE BASE
1 10560.0 10860.0
3 10860.0 10973.3
4 10973.3 11077.0
5 11077.0 11443.0
6 11443.0 11995.0
MERGED MAIN PASS.
ROP WAS SHIFTED WITH GR.
/??SHIFTE9A.OUT
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 39
Tape File Start Depth = 11996.000000
Tape File End Depth = 10368.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
9772 datums
Tape Subfile: 2
220 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
~ Subfile 3 is type: LIS
FILE HEADER
FILE NIIMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10369.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10977.0
29-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11027.0
10560.0
11027.0
0
37.7
77.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NI/MBER
NGP 126
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
10560.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
POLYM
9.00
94.0
9.5
34000
.0
.000
.000
.000
.000
.0
51.6
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 1.
CN
WN
FN
COUN
STAT
DATA BELOW KICK-OFF POINT OF 10860' MD IS NOT FROM THIS
WELLBORE. IT IS FROM THE FIRST WELLBORE, E-09A PB1.
$
: BP EXPLORATION (ALASKA)
: E-09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 16
Tape File Start Depth = 11030.000000
Tape File End Depth = 10368.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
3976 datums
Tape Subfile: 3
81 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
,Fe Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10767.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM A_NGLE:
MAXIM UMANGLE:
STOP DEPTH
10973.0
02-JAN-95
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10973.3
10860.0
10973.3
0
64.6
68.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 145
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
10560.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
POLYM
9.00
82.0
10,5
35000
5.8
.000
.000
.000
.000
.0
49.6
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 3.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10975.000000
Tape File End Depth = 10765.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 11036 datums
Tape Subfile: 4 69 records...
Minimum record length: 18 bytes
Maximum record length: 1014 bytes
~pe Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10973.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11027.0
02 -JAN- 95
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11077.0
10973.3
11077.0
0
68.1
81.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 145
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
10560.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
POLYM
9.00
87.0
9.3
36000
4.8
.000
.000
.000
.000
.0
46.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 4.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File-~Start' Depth- = 11080.000000
Tape File End Depth = 10970.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
4640 datums
Tape Subfile: 5
66 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Ape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 5
DEPTH INCREMENT: .5000
FILE SIZVfMARY
VENDOR TOOL CODE START DEPTH
GR 11027.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11393.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
03-JAN-95
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11443.0
11077.0
11443.0
0
87.5
94.3
TOOL NUMBER
NGP 126
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
10560.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
POLYM
9.00
90.0
9.3
35000
4.8
.000
.000
.000
.000
.0
53.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 5.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 11450.000000
Tape File End Depth = 11025.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 13590 datums
Tape Subfile: 6 74 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
.pe Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11379.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11951.0
06-JAN-95
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11995.0
11443.0
11995.0
0
91.7
94.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 145
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
10560.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
POLYM
9.10
75.0
8.9
35500
5.1
.000
.000
.000
.000
.0
58.6
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 6.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 15
Tape File Start Depth = 11996.000000
Tape File End Depth = 11375.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 8370 datums
Tape Subfile: 7 78 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
~pe Subfile 8 is type: LIS
96/ 1/22
01
**** REEL TRAILER ****
96/ 1/24
01
Tape Subfile: 8 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Wed 24 JAN 96 8:04a
Elapsed execution time = 1.53 seconds.
SYSTEM RETURN CODE = 0
_Lie 2 is type: LIS
zAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
MWD RUN 1
JOB NUMBER: 6567.00
LOGGING ENGINEER: T. MCGUIRE
OPERATOR WITNESS: D. WESTER
SURFACE LOCATION
SECTION:
TOWNSH I P:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
OPEN HOLE
E-09A PB1
500292046670
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
22-JAN-96
MWD RUN 2
T. MCGUIRE
D. HEIM
6
liN
14E
915
540
65.10
63.60
30.70
I ICRO ILI ED
CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING 6.000 11422.0
REMARKS: MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
ALL RUNS ARE DGWD DIRECTIONAL & GAMMA RAY (SGRD) FROM
THE NGP TOOL.
KICK-OFF POINT FROM ORIGINAL WELL, E-09, IS AT 10560'.
A WINDOW WAS MILLED IN 7" CASING FROM 10558 - 10630'.
THIS WELL, E-09A PB1, IS FROM MWD RUNS 1 & 2.
A PLUG WAS SET AFTER MWD RUN 2 AND A KICK-OFF WAS
DONE AT 10860' TO THE OTHER WELLBORE, E-09A.
THE WELL E-09A IS FROM MWD RUNS 1, 3, 4, 5, & 6.
~EADER
=£LE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves;
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 10438.0 11363.0
$
BASELINE CURVE FOR SHIFTS: open hole GR from WALS,
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH GR
10438.5 10442.5
10440.0 10444.0
10442.0 10446.0
10445.5 10449.5
10518.0 10525.5
10543.5 10550.0
10552.0 10559.0
10576.5 10583.0
10610.5 10618.0
10616.0 10623.0
10622.0 10629.0
10623.5 10630.5
10629.0 10636.0
10632.0 10639.5
10650.5 10657.5
10655.0 10662.0
10660.0 10667.5
10662.0 10669.0
10666.0 10673.0
10686.5 10694.5
10700.0 10709.0
10707.0 10715.0
10713.5 10723.0
10717.5 10726.5
10728.0 10738.5
10746.0 10751.5
10748.0 10757.0
10756.5 10766.0
10761.5 10770.0
10772.5 10781.5
10777.5 10786.0
10782.0 10791.0
10790.5 10799.0
10797.5 10805.5
10816.0 10824.0
10837.0 10845.5
10850.5 10859.0
11413 . 5 11422 . 0
$
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO
MWD 1
MWD 2
all bit runs merged.
07-JAN-95.
EQUIVALENT UNSHIFTED DEPTH
MERGE TOP MERGE BASE
10560.0 11027.0
11027.0 11422.0
REMARKS:
MERGED MAIN PASS.
ROP WAS SHIFTED WITH GR.
CN
WN
FN
COUN
STAT
/??SHIFTPB1 . OUT
$
: BP EXPLORATION (ALASKA)
: E-09A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 24
Tape File Start Depth = 11423.000000
Tape File End Depth = 10430.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 5962 datums
Tape Subfile: 2 148 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
_ Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10369.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMIIMANGLE:
STOP DEPTH
10977.0
29-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11027.0
10560.0
11027.0
0
37.7
77.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 126
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
10560.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
POLYM
9.00
94.0
9.5
34000
.0
.000
.000
.000
.000
.0
51.6
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 1.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-09A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR NfWD 68
2 ROP MWD 68
1 AAPI 4
1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 16
Tape File Start Depth = 11030.000000
Tape File End Depth = 10368.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 3976 datums
Tape Subfile: 3 79 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
_ Subfile 4 is type: LIS
-
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 2
DEPTH INCREMENT: .5000
FILE SIIMMARY
VENDOR TOOL CODE START DEPTH
GR 10977.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11372.0
31-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11422.0
11027.0
11422.0
0
77.5
96.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 126
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
10560.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
POLYM
9.00
78.0
10.0
35000
.0
.000
.000
.000
.000
.0
53.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 2.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-09A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FOR~W_AT RECORD (TYPE# 64)
DEPTH PER FRAME
'Taue depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 11423.000000
Tape Pile End Depth = 10975.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 8654 datums
Tape Subfile: 4 74 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
_ Subfile 5 is type: LIS
96/ 1/22
O!
**** REEL TRAILER ****
96/ 1/22
O1
Tape Subfile: 5 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 22 JAN 96 4:06p
Elapsed execution time = 0.99 seconds.
SYSTEM RETURN CODE = 0
E - 09A
RECEIVED
JAN 2,~ 1995
PRUDHOE BAY~
Oil & Gas Cons. Commissjpn
Anchorage
.."% .~
~...._. .....
ATLAS
Atlas Wireline Services
'" 979
!!_ _
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
RUN 1
6340.00
R. ECK
H. HAYWOOD
E - 09A
500292046601
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
13 -JAN-94
RUN 2 RUN 3
6
liN
14E
244
500
65.10
63.60
30.70
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING 7.000 10559.0
PRODUCTION STRING 6.000 11995.0
REMARKS: DLL/AC/CN/GR.
CIRCULATION STOPPED AT 1800, 06-JAN-95.
TOOL STRING WAS RUN DRILL PIPE CONVEYED.
NEUTRON LOG PARAMETERS:
SANDSTONE MATRIX,
BOREHOLE CORRECTION = 6.00",
CHISM FILTERING IS ACTIVE,
CASING CORRECTIONS OFF,
SALINITY = 0.00 PPM.
MAIN PASS ACOUSTIC HAD MANY CYCLE SKIPS DUE TO RUGOSE
BOREHOLE. THE INTERVAL FROM 11220 - 11370' IS HIGHLY
RUGOSE & SUFFERED FROM NEAR CONSTANT CYCLE SKIPPING.
DOWN PASS FOR THE ACOUSTIC LOG WAS PRESENTED FOR
QUALITATIVE PURPOSES ONLY. GR IS NOT VALID WHEN
LOGGING DOWN.
AT BP'S REQUEST THE ACOUSTIC CURVE HAS BEEN EDITED TO
REMOVE CYCLE SKIPPING SECTIONS. MISSING SECTIONS
WERE REPLACED FROM THE REPEAT OR DOWN PASSES WHEN
AVAILABLE. OTHER MISSING SECTIONS WERE EITHER FLAT
LINED OR REPLACED BY A PSEUDO ACOUSTIC CURVE DERIVED
FROM NEUTRON POROSITY.
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
Ail tool strings;
hole data.
DEPTH INCREMENT:
FILE SUMMARY
depth shifted and clipped curves; all runs merged;
.5000
PBU TOOL CODE
GR
BCS
DLL
2435
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH LL3
10576.5
START DEPTH STOP DEPTH
10553.0 11914.0
10553.0 11916.0
10553.0 11943.0
10553.0 11916.0
EQUIVALENT UNSHIFTED DEPTH .........
NPHI AC
10576.5
10577.0 10576.5
10611.0 10611.5 10612.0
10615.5 10615.5
10616.0 10616.0
10622.0 10622.0 10622.5
10629.0 10630.0
10632.0 10631.0
10632.5 10632.0
10650.5 10650.5
10653.5 10654.0
10666.0 10666.0
10666.5 10666.5 10667.0
10673.0 10672.5
10675.0 10675.5
10681.0 10681.0
10686.0 10685.5
10712.5 10713.0
10718.0 10718.0
10725.0 10725.0 10725.0
10728.0 10728.0
10734.0 10734.5
10738.5 10739.5 10739.5
10742.0 10742.5
10745.5 10745.5
10746.0 10746.5 10746.0
10748.0 10748.5
10748.5 10748.5
10756.5 10757.0 10757.5 10757.0
10761.0 10761.5
10768.0 10768.5
10773.0 10773.5
10790.0 10790.0
10790.5 10790.5
10794.0 10793.0 10794.0 10794.0
10797.5 10797.0 10797.5
10799.0 10799.5
10799.5 10799.5
10802.5 10802.0
10816.0
10815.5
no case
10837.5
10854.0
10854.5
10859.0
10866.5
10871.5
10874.5
10891.0
10898.0
10906.5
10909.0
10909.5
10913.5
10920.5
10925.5
10936.5
10942.0
10948.5
10956.0
10961.0
10968.0
10973.5
10981.0
10987.0
10989.0
10995.0
11010.0
11040.5
11069.5
11075.5
11083.5
11084.0
11155.5
11166.0
11169.0
11173.0
11178.0
11198.0
11233.5
11373.5
11391.5
11414.5
11462.5
11531.5
11566.5
11567.0
11582.0
11586.0
11614.0
11665.0
11667.0
11667.5
11753.5
11847.5
11848.0
11860.5
11871.5
$
MERGED DATA SOURCE
1O855.O
10909.5
10961.0
10987.0
11083.5
11165.5
11198.5
11391.0
11665.5
10858.0
10871.0
10898.0
10907.0
10909.5
10921.0
10936.5
10955.5
10988.5
11075.5
11172.5
11233.0
11414.5
11462.5
11567.5
11614.0
11667.5
11753.0
11847.5
11860.5
11871.5
10837.0
10854.0
10866.5
10874.5
10891.5
10913.5
10925.5
10942.0
10948.0
10955.0
10967.5
10972.0
10980.5
10987.0
10996.0
11009.5
11040.5
11070.0
11083.0
11155.5
11168.5
11172.5
11178.0
11373.0
11532.0
11567.0
11582.0
11586.5
11667.0
11753.0
11847.0
11871.5
PBU TOOL CODE
GR
BCS
DLL
2435
$
REMARKS:
RUN NO. PASS NO. MERGE TOP
1 3 10553.0
1 3 10553.0
1 3 10553.0
1 3 10553.0
MERGE BASE
11914.0
11916.0
11943.0
11916.0
OPEN HOLE portion of MAIN PASS.
DT CURVE HAS BEEN EDITED TO REMOVE CYCLE SKIPPING.
LLD, SP, MTEM, TEND, & TENS WERE SHIFTED WITH LL3.
FUCT & NUCT WERE SHIFTED WITH NPHI.
CN
WN
FN
COUN
STAT
/ ? ?MATCH1. OUT
/ ? ?MATCH2. OUT
/ ??MATCH3. OUT
$
: BP EXPLORATION (ALASKA)
: E - 09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
11 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR BCS 68 1 GAPI
2 DT BCS 68 1 US/F
3 TEND BCS 68 1 LB
4 TENS BCS 68 1 LB'
5 LL3 DLL 68 1 OHMM
6 LLD DLL 68 1 OHMM
7 MTEM DLL 68 i DEGF
8 SP DLL 68 1 MV
9 NPHI 2435 68 1 PU-S
10 FUCT 2435 68 1 CPS
11 NUCT 2435 68 1 CPS
4 4 67 465 06 6
4 4 20 789 90 0
4 4 20 789 90 0
4 4 20 789 90 0
4 4 30 739 95 0
4 4 30 739 95 0
4 4 30 739 95 0
4 4 30 739 95 0
4 4 98 211 23 1
4 4 98 211 23 1
4 4 98 211 23 1
44
* DATA RECORD (TYPE~ 0) 1014 BYTES *
Total Data Records: 137
Tape File Start Depth = 11987.000000
Tape File End Depth = 10553.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 34429 datums
Tape Subfile: 2 340 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 10432.0 10553.0
2435 10501.0 10553.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH .........
BASELINE DEPTH
$
REMARKS: CASED HOLE portion of MAIN PASS.
DUE TO THE SHORT LENGTH OF THE LOGGED INTERVAL, NO
DEPTH MATCHING WAS DONE.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E - 09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2435 68 1 GAPI 4
2 NPHI 2435 68 1 PU-S 4
3 FUCT 2435 68 i CPS 4
4 NUCT 2435 68 1 CPS 4
5 TEND 2435 68 i LB 4
6 TENS 2435 68 1 LB 4
4 08 501 10 0
4 52 326 75 5
4 84 023 70 1
4 83 368 34 1
4 19 912 29 5
4 19 912 29 5
24
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 9
Tape File Start Depth = 10553.000000
Tape File End Depth = 10403.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 2108 datums
Tape Subfile: 3 39 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 3
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10432.0
AC 10496.0
DLL 10500.0
2435 10438.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
STOP DEPTH
11914.5
11979.5
11944.0
11921.0
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV
CHT
ISO
KNJT
ISO
TEMP
KNJT
GR
CN
PCM
KNJT
MIS
DLL
KNJT
FTS
MIS
KNJT
AC
$
SWIVEL SUB
CABLEHEAD TENSION
BRIDAL ISOLATOR
KNUCKLE JOINT
BRIDAL ISOLATOR
TEMPERATURE
KNUCKLE JOINT
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
KNUCKLE JOINT
'MASS ISOLATION SUB
DUAL LATEROLOG
KNUCKLE JOINT
FEED THROUGH SUB
MASS ISOLATION SUB
KNUCKLE JOINT
BHC ACOUSTILOG
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
07-JAN-95
FSYS JlV2 BETA RELEASE 4
1800 06-JAN-95
1025 07-JAN-95
11995.0
11986.0
10432.0
11979.0
1500.0
TOOL NUMBER
3944XA
3974XA
3997XA
3921NA
3997XA
2806XA
3921NA
1309XA
2435XA
3506XA
3921NA
3967XA
1229EA/1229MA
3921NA
3967XA
3921NA
1609EB/1603MA
6.000
10559.0
10553.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
POLYM
9.00
90.0
9.2
4.0
186.0
.132
· 046
.113
.000
.098
.000
65.0
186.0
75.0
.0
64.0
.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
.00
6.000
TOOL STANDOFF (IN):
.0
REMARKS:
MAIN PASS.
THE AC CURVE PRESENTED IN THIS FILE IS AS RECORDED.
NO CURVE EDITING (TO REMOVE CYCLE SKIPS) HAS BEEN
DONE ON THIS AC CURVE.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E- 09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
19 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1
2
3
4
5
6
7
8
9
10
11
12
GR AC 68 1 GAPI
AC AC 68 1 US/F
ACQ AC 68 1
CHT AC 68 1 LB
TTEN AC 68 1 LB
SPD AC 68 1 F/MN
RS DLL 68 1 OHMM
RD DLL 68 1 OHMM
IS DLL 68 1 A
ID DLL 68 1 A
ES DLL 68 1 MV
ED DLL 68 1 MV
4 4 06 969 49 6
4 4 48 852 89 1
4 4 81 285 47 0
4 4 95 558 30 1
4 4 95 558 30 1
4 4 61 094 30 1
4 4 40 514 81 0
4 4 39 859 45 0
4 4 30 739 95 0
4 4 30 739 95 0
4 4 30 739 95 0
4 4 30 739 95 0
13 TEMP DLL 68 1
14 SP DLL 68 1
15 CNC 2435 68 1
16 CNCF 2435 68 1
17 CN 2435 68 1
18 LSN 2435 68 1
19 SSN 2435 68 1
* DATA RECORD (TYPE# 0)
Total Data Records: 529
DEGF
MV
PU-S
PU-S
PU-L
CPS
CPS
4 4 84 503 82
4 4 23 415 80
4 4 98 211 23
4 4 98 211 23
4 4 52 326 75
4 4 84 023 70
4 4 83 368 34
76
966 BYTES *
Tape File Start Depth = 11987.000000
Tape File End Depth = 10403.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 161170 datums
Tape Subfile: 4 620 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 5 is type: LIS
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
FILE HEADER
FILE NUMBER: 4
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
1
1
4
.2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10430.0 10701.0
AC 10495.0 10766.5
DLL 10460.0 10731.0
2435 10436.5 10708.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV
CHT
ISO
KNJT
ISO
TEMP
KNJT
GR
CN
PCM
KNJT
MIS
DLL
KNJT
FTS
MIS
KNJT
AC
$
SWIVEL SUB
CABLEHEAD TENSION
BRIDAL ISOLATOR
KNUCKLE JOINT
BRIDAL ISOLATOR
TEMPERATURE
KNUCKLE JOINT
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
KNUCKLE JOINT
MASS ISOLATION SUB
DUAL LATEROLOG
KNUCKLE JOINT
FEED THROUGH SUB
MASS ISOLATION SUB
KNUCKLE JOINT
BHC ACOUSTILOG
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
07-JAN-95
FSYS JlV2 BETA RELEASE 4
1800 06-JAN-95
1216 07-JAN-95
11995.0
11986.0
10432.0
11979.0
1500.0
TOOL NUMBER
3944XA
3974XA
3997XA
3921NA
3997XA
2806XA
3921NA
1309XA
2435XA
3506XA
3921NA
3967XA
1229EA/1229MA
3921NA
3967XA
3921NA
1609EB/1603MA
6.000
10559.0
10553.0
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: REPEAT PASS.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E - 09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
POLYM
9.00
90.0
9.2
4.0
186.0
.132
.046
.113
.000
.098
.000
THERMAL
SANDSTONE
.00
6.000
.0
65.0
186.0
75.0
.0
64.0
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
19 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
GR AC 68 1 GAPI 4
AC AC 68 1 US/F 4
ACQ AC 68 1 4
CHT AC 68 1 LB 4
TTEN AC 68 1 LB 4
SPD AC 68 1 F/MN 4
RS DLL 68 1 OHMM 4
RD DLL 68 1 OHMM 4
IS DLL 68 1 A 4
ID DLL 68 1 A 4
ES DLL 68 1 MV 4
ED DLL 68 1 MV 4
TEMP DLL 68. 1 DEGF 4
SP DLL 68 1 MV 4
CNC 2435 68 1 PU-S 4
CNCF 2435 68 i PU-S 4
CN 2435 68 1 PU-L 4
4 06 969 49 6
4 48 852 89 1
4 81 285 47 0
4 95 558 30 1
4 95 558 30 1
4 61 094 30 1
4 40 514 81 0
4 39 859 45 0
4 30 739 95 0
4 30 739 95 0
4 30 739 95 0
4 30 739 95 0
4 84 503 82 1
4 23 415 80 5
4 98 211 23 1
4 98 211 23 1
4 52 326 75 5
18 LSN 2435 68 1 CPS
19 SSN 2435 68 1 CPS
* DATA RECORD (TYPE# 0)
Total Data Records: 126
4 4
4 4
76
966 BYTES *
84 023
83 368
70
34
Tape File Start Depth = 10774.000000
Tape File End Depth = 10398.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 32209 datums
Tape Subfile: 5 212 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 2
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10427.5
AC 10492.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
11912.5
11977.0
07-JAN-95
FSYS J1V2 BETA RELEASE 4
1800 06-JAN-95
834 07-JAN-95
11995.0
11986.0
10432.0
11979.0
1500.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV
CHT
ISO
KNJT
ISO
TEMP
KNJT
GR
CN
PCM
KNJT
MIS
DLL
KNJT
FTS
MIS
KNJT
AC
$
SWIVEL SUB
CABLEHEAD TENSION
BRIDAL ISOLATOR
KNUCKLE JOINT
BRIDAL ISOLATOR
TEMPERATURE
KNUCKLE JOINT
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
KNUCKLE JOINT
MASS ISOLATION SUB
DUAL LATEROLOG
KNUCKLE JOINT
FEED THROUGH SUB
MASS ISOLATION SUB
KNUCKLE JOINT
BHC ACOUSTILOG
TOOL NUMBER
3944XA
3974XA
3997XA
3921NA
3997XA
2806XA
3921NA
1309XA
2435XA
3506XA
3921NA
3967XA
1229EA/1229MA
3921NA
3967XA
392 iNA
1609EB/1603MA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
6.000
10559.0
10553.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
POLYM
9.00
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
90.0
9.2
4.0
186.0
.132
.046
.113
.000
.098
.000
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
0.000
TOOL STANDOFF (IN):
.0
REMARKS:
DOWN PASS.
GR IS NOT VALID (INCLUDED FOR CORRELATION) .
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E - 09A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
65.0
186.0
75.0
.0
64.0
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR AC 68
2 AC AC 68
3 ACQ AC 68
4 CHT AC 68
5 TTEN AC 68
6 SPD AC 68
1 GAPI
1 US/F
1
1 LB
1 LB
1 F/MN
4 4 06 969 49 6
4 4 48 852 89 1
4 4 81 285 47 0
4 4 95 558 30 1
4 4 95 558 30 1
4 4 61 094 30 1
24
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 177
Tape File Start Depth = 11985.000000
Tape File End Depth = 10393.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 205754 datums
Tape Subfile: 6 262 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes'
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request:
[] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other /
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
243' SNL, 500' WEL, SEC. 06, T11N, R14E, UM
At top of productive interval
959' SNL, 4513' EWL, SEC. 05, T11N, R14E, UM
At effective depth
589' SNL, 5111' EWL, SEC. 04, T11N, R14E, UM
At total depth
551' SNL, 249' EWL, SEC. 04, T11N, R14E, UM
5. Type of well:
[] Development
[] Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KB)
KBE = 65.01'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number /'
E-09A
/
9. Permit Number
194-148
10. APl Number
50- 029-20466-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Casing
12. Present well condition summary
Total depth: measured 11995 feet Plugs (measured) ,_~!
true vertical 8878 feet
Effective depth: measured 11906 feet Junk (measured)
true vertical 8880 feet ~. ~,..~;h,~, ;~,-~.,~.
Length Size Cemented M D TVD
Structural
Conductor 110' 20" x 30" 11.8 cu yds Arcticset 110' 110'
Surface 2671' 13-3/8" 2790 cuft Arcticset II 2671' 2671'
Intermediate 10213' 9-5/8" 1455 cuft Class 'G', 130 cuft AS 10213' 8386'
Production
Liner 841' 7" 253 cuft Class 'G' 9717' - 10558' 7983' - 8658'
Liner 2442' 5" 286 cuft Class 'G' 9553' - 11995' 7849' - 8878'
Perforation depth: measured
true vertical
11036'-11076', 11130'-11240', 11450'-11590', 11660'-11780', 11830'-11900'
8898'-8900', 8899'-8895', 8882'-8881', 8881'-8882', 8881'-8881'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 tubing to 9542'; 2-7/8" Isolation Assembly from 11080' to 11122'
Packers and SSSV (type and measured depth) 5" Baker packer at 11080'; 9-5/8" TIW 'HBBP' packer at 9495'; 4-1/2" Otis SSSV Nipple
at 2083'
13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch
4. Estimated date for commencing operation/
August 7, 2002 /
16. If proposal was verbally approved
15. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
Name of approver Date Approved
Contact Engineer Name/Number: Alistair Sherwood, 564-4378 Prepared By Name/Nurnbec Terrie Hubble, 564-4628
17. I hereby certify that the fo~[~go~,g is true, and correc_¢ to the best of my knowledge / [ I
Signed AI,sta,rSherwood~~v"~Sc/{/~:~cJC)~, Title CT Drilling Engineer Date ~'~
I
Conditions of Approval'. Notify Commission so representative ma~witness J App,vv~, ....... ,,~v.~'~ '~r~ ~/...-' '~ ~..") T-',LL ~' i j
Plug integrity BOP Test /~ Location clearance I '-'" '-' '--' I
Mechanical Integrity Test__ Subsequent form required 10- /"jo7
Approved by order of the Commission Commissioner Date
Form 10-403 Rev. 06/15/88 b J L Submi, In Yril~licate
To:
Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Alistair Sherwood
CTD Engineer
Date: July 30, 2002
Re: CTD Sidetrack of well E-09a
When it becomes available in Sep 02, BP's new coil tubing drilling rig, Nordic 2 will dr~l a thru-tubing sidetrack
from E-09A. In mid Jul 01, E-09A became a swing well due to a >25000scf/stb GOR: Since then uptime has
fallen from 30% to 10%. The sidetrack, E-09B will make the well competitive again. From a kick-off point in the
Ivishak lower Z2B formation from a window cut in the 5", 15# liner the 1400' sidetrack will target Zone 1A/1 B
reserves in the far eastern part of E-pad. 'The following describes prep work for sidetracking and is submitted as
an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference.
1. All GLM's have been dummied off and MIT-IA tested successfully to 2500 psi. (4/3/02)
2. MIT-OA tested successfully to 1000psi. (3/7/02)
3. Tubing successfully drifted & callipered with PDS. (2/27/02)
4. Run & set 5" monobore whipstock at 10,675' with a zero degree TF for a highside exit.
5. P&A open perfs below the whipstock with 35bbls, (25 bbls in liner & 10bbls squeezed behind pipe)
The well will be prepared as soon as permitted. Nordic 2 is scheduled to be over the well, Sep 15th.
CTD Drilling Engineer
CC: Well File
Terrie Hubble
TREE = 4" 5M CIW
WI~_LHEAD = 13-5/8" MCEVOY
ACTUATOR = BAKER
KB. ELEV = 65.01'
BF. ELEV = 30.76'
KOP = 3200'
Max Angle = 95 @ 11300'
Datum MD = 10914'
Datum 'I'VD = 8800' SS
I 13-3/8" CSG,72#, L-80, ID= 12.347" I--I 2671'
IMinimum ID = 2.205" @ 11114'
2-7/8" XN NIPPLE
E-09A
SAi '~NOTES
2083' H4-1/2- OTIS sssv NIP, ID = 3.813"
2620' H9-5/8. Dv PKRI
GAS LIFT MANDRELS
2 18264168051 44 1 MERI IRA I I I
4-1/2" 'I'BG, 12.6#, L-80, 0.0152 bpf, ID = 3.953" I--I 9542'
ITOP OF 5" LINER H 9553'
ITOPOF7" LINER I--I 9717'
9-5/8" CSG, 47#, L-80, ID = 8.68" I~ 10213'
PERFORATION SUMMARY
REF LOG: SWS MWD GR 01/5/95; ATLAS STP 02/09/95
ANGLEATTOP PERF: 82 @ 11036'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 11036' -11056' O 02/15~95
3-3/8" 4 11056' - 11076' O 02/14/95
3-3/8" 4 11130' -11240' O 01/14/95
3-318" 4 11450' -11590' O 01/14/95
3-3~8" 4 11660'-11780' O 01/14/95
3-3/8" 4 11830' -11900' O 01/14/95
·
7" LNR, 29#, L-80, 0.0371 bpf, ID = 6.184" I--i 10898'
I
TOP OF 2-7/8" TBG
I 2-7/8" TBG, L-80#, 0.0188 bpf, Id = 4.408"
11113'
11122'
9483' H4-1/2,, OTIS x NIP, ID= 3.813" I
9495' I--I4-1/2"TIWHBBPPKR' ID=4'32"
9519' 1-14-1/2- OTIS X NIP, ID = 3.813" I
9530' H4-1/2- OTIS XN NIP, ID = 3.725"
9542' H4-1/2"WLEG, ID=3.958"I
I--I ELMD TT LOGGED 02/09/95 I
MILLOUT WINDOW IN 7" @ 10569'
10558' - 10569'
10580'
I-F
11080' I'-I5'' BAKERPKR, ID= 2.500" I
11114' H2-7/8" XN NIP, ID= 2.205"
11122' I--~ 2-7/8" WLEG ID = 2.441"
11906' I
I 5" LNR, 15#, 13CP,, 0.0188 bpf, ID = 4.408" 11995' I
DATE REV BY COMMENTS DATE REV BY COMMENTS
05~80 ORIGINAL COMPLETION
01113~95 DFF SIDETRACK COMPLETION
01/29/01 SlS-QAA CONVERTEDTO CANVAS
02/27/01 SlS-LG FINAL
07/18/01 RNFrP CORRECTIONS
PRUDHOE BAY UNIT
WELL: E-09A
PERMIT No: 94-1480
AP1 No: 50-029-20466-01
Sec. 6, T11N, R14E
BP Exploration (Alaska)
TREE = 4" 5M ClW
~/ELLHEAD = 13-5/8" MCEVOY
ACTUATOR = BAKER
KB. ELEV = 65.01
BF. ELEV = 30.76'
KOP = 3200'
Max Angle = 95 @ 11300'
Datum MD = 10914'
Datum TVD = 8800' SS
I 13-3/8" CSG,72#, L-80, ID = 12.347" I--~ 2671'
IMinimum ID = 2.205" @ 11114' I
2-718" XN NIPPLE
I
E-09B I,
Proposed CTD Sidetrack
NOTES
2083' I-~4-1/2" OTIS SSSV NIP, ID= 3.813"
2620' I-I.-~,~" DV ~<~I
GAS LIFT MANDRELS
1 314384141981 361MERI IRA I I I
--I 218264168051 441DERI IRA I I I
4-1/2" 'I'BG, 12.6#, L-80, 0.0152 bpf, ID = 3.953" I--~ 9542'
ITOPOF5" LINER I--~ 9553'
9717'
9483'
9495'
9519'
9530'
9542'
I---]4-1/2" OTIS X NIP, ID = 3.813"I
l-~4-1/2" TIVV HBBPPKR, ID=4.32" I
10213'
PERFORATION SUMMARY
REF LOG: SWS MWD GR 01/5/95; ATLAS STP 02/09/95
ANGLE AT TOP PERF: 82 @ 11036'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 11036' - 11056' O 02/15/95
3-3/8" 4 11056' - 11076' O 02/14/95
3-3/8" 4 11130'-11240' O 01/14/95
13-3/8" 4 11450'-11590' O 01/14/95
3-318" 4 11660'-11780' O 01/14/95
3-3~8" 4 11830'-11900' O 01/14/95
I 7" LNP,, 29#, L-80, 0.0371 bpf, ID = 6.184" I--~ 10898'
TOP OF 2~7/8" 'I'BG I'-~ 11113'
I 2-7/8"'FBG, L-80#,0.0188bpf, ID=4.408" I-I 11122'
10100' I--~Top of 3-3/16" Liner
10100' I-'~Top of Cement
MILLOUT WINDOW IN 7" @ 10569'
10558' - 10569'
10675' I-"1 Mechanical Whipstock
10705' 3-3/16 x 2-7/8 X-over
3-3/16"X2-7/8" cmt'ed and perfedu 12470'
110S0' ]--~5" BAKER PKR, ID = 2.500"
11114' I-~2-7/8" XN NIP, ID = 2.205"I
11122' I-~2-7/8" WLEG ID = 2.441" I
I 5" LNR, 15~, 13CR, 0.0188 bpf, ID=4.408" I--~ 11995' I
DATE REV BY COMMENTS DATE REV BY COMMENTS
05~80 ORIGINAL COMPLETION
01/13/95! DFF SIDETRACK COMPLETION
01/29/01 SIS-QAA CONVERTED TO CANVAS
02/27/01 SIS-LG FINAL
07/18/01 RN/TP CORRECTIONS
PRUDHOE BAY UNIT
WELL: E-09A
PERMIT No: 94-1480
APl No: 50-029-20466-01
Sec. 6, T11N, R14E
BP Exploration (Alaska)