Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-149CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:McLellan, Bryan J (OGC) To:Ryan Rupert Cc:Dan Marlowe; Darcy Dunbar - (C); Howard Hooter - (C); Juanita Lovett Subject:RE: Granite Point State 18742 17A (Anna-17A)_PTD#213-049 Date:Sunday, November 24, 2024 3:40:00 PM Ryan, Hilcorp has approval to proceed with the revised plan below. All conditions of approval on the original sundry still apply. Regards Bryan McLellan Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission Bryan.mclellan@alaska.gov +1 (907) 250-9193 From: Ryan Rupert <Ryan.Rupert@hilcorp.com> Sent: Sunday, November 24, 2024 3:22 PM To: McLellan, Bryan J (OGC) <bryan.mclellan@alaska.gov> Cc: Dan Marlowe <dmarlowe@hilcorp.com>; Darcy Dunbar - (C) <Darcy.Dunbar@hilcorp.com>; Howard Hooter - (C) <Howard.Hooter@hilcorp.com>; Juanita Lovett <jlovett@hilcorp.com>; Ryan Rupert <Ryan.Rupert@hilcorp.com> Subject: Granite Point State 18742 17A (Anna-17A)_PTD#213-049 Bryan- Please see below for proposed change of procedure on Anna-17A HWO currently in progress. Given that we can’t get down to bottom in the short string, the proposed path forward would hopefully eliminate the need to pull dual strings concurrently and eliminate the need to handle 2-3/8” pipe / rams, while still meeting abandonment requirements (no changes to abandonment steps). An updated proposed schematic is attached. Please let us know if Hilcorp has approval to proceed with the amended path forward below. Thank you. Ops completed thus far: EL drift short string for cutter Couldn’t get deeper than 9,203’ MD (uncorrected) Likely tagging on crossover at 9,197’ MD Known historical scale in short string Proposed amended path forward 5. Cut short string a. RU EL to short string b. RIH and cut just above Kobe block at 10,017’ MD 2-7/8” x 2-3/8” Cross over at 9,197’ MD c. Move over to Long string and cut at ±9,200’ MD d. RD EL 6. Unseat Short string and POOH with 2-7/8” x 2-3/8” tubing 7. Unseat Long string and POOH with 2-7/8” tubing, Kobe block, and tail pipe 10. PU pipe and RIH with 9-5/8” cement retainer (may use 2-7/8” work string or 4-1/2” completion tubing. TBD) Ryan Rupert CIO Ops Engineer (#13088) 907-301-1736 (Cell) 907-777-8503 (Office) The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Updated by: JLL 11/18/24 PROPOSED Anna Platform Well No. AN-17A Completion Date: FUTURE PTD: 213-049 API: 50-733-20311-01-00 Cement Details 13-3/8”17-1/2” hole: Cemented with 621bbls 13.4ppg Class G lead followed by 72bbls 15.2ppg tail . No losses. Saw returns to surface.ToC to surface. 9-5/8”12-1/4” Hole: Cemented with 450bbls 12.5ppg lead class cement, and 45bbls 15.8ppg tail cement. 119bbl losses throughout displacement.6/14/15 shows ToC at 3,125’ MD 4-1/2 X 9-5/8”Target TOC ±3,000’ MD CASING AND TUBING DETAIL SIZE (in) WT (lbs/ft) GRADE CONN ID (in) TOP (ft) BTM (ft) 30 94 X-55 - - Surf - 20 91.5 X-52 - 19.124 Surface 610 13-3/8 54.5, 61, 68, 72 K-55 & L-80 BTC 12.347 Surface 3,514 9-5/8 47 L-80 DWC/C HT 8.681 Surface 8,720 9-5/8 47 P-110 DWC/C HT 8.681 8,720 10,483 7 29 P-110 DWC/C HT 6.184 9,403 12,915 Tubing 4-1/2” Surf ±8,500’ Perforation Detail Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)Amt SPF Date Status ±5,653’ ±7,730’ ±5,500’ ±7,521’ Future Proposed JEWELRY DETAIL No Depth (MD) Depth (TVD)ID Item Tubing Hanger 1 ±350’ ±350’SSSV 2 ±8,750’ ±8,514’ Cement Retainer w/ 5bbls cement (TOC ±8,610’) Updated by: JLL 11/18/24 PROPOSED Anna Platform Well No. AN-17A Completion Date: FUTURE PTD: 213-049 API: 50-733-20311-01-00 Isolated Jewelry Details Item Description ID (in) OD (in) Depth (ft) 3 CIBP 11,875’ 4 Packer: 7" 26-32# Model "D" Permanent Pkr 3.250 5.810 11,900’ Concentric Packer Adapter 3.250 5.810 11,901’ Seal Bore Extension: 3.250'' X 5' 3.250 4.250 11,902’ Tbg Adapter:2-7/8'' EUE Box 2.810 4.990 11,906 ‘ 5 "R" - Landing Nipple 2.188 3.669 11,915’ 6 Sliding Sleeve 2 7/8'', "R" 2.188 3.190 12,055’ Pyrotechnic Delay Firing Head - 3.125 12,077’ Blank Safety Spacer: 4 1/2'' - 4.500 12,078‘ 6 SPF SDP TCP Assembly: 4.5'' Top Shot - 4.500 12,084’ 6 SPF SDP TCP Assembly: 4.5'' Btm Shot - 4.500 12,450’ Lower Firing Adapter: 4.5'' - 3.125 12,451’ Pyrotechnic Delay Firing Head - 3.125 12,453’ Isolated Perforation Detail Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)Amt SPF Date Status C5B 9,241' 9,248' 8,980' 8,986' 7' 5 6/18/2015 Isolated (Future) C5B 9,260' 9,279' 8,997' 9,014' 19' 5 6/18/2015 Isolated (Future) C7A 9,541' 9,554' 9,253' 9,264' 13' 5 6/18/2015 Isolated (Future) C7A 9,568' 9,580' 9,277' 9,288' 12' 5 6/18/2015 Isolated (Future) C7C 9,652' 9,669' 9,352' 9,367' 17' 5 6/18/2015 Isolated (Future) C7C 9,678' 9,704' 9,374' 9,397' 26' 5 6/18/2015 Isolated (Future) C7E 9,758' 9,781' 9,444' 9,464' 23' 5 6/18/2015 Isolated (Future) C8B 9,919' 9,969' 9,581' 9,623' 50' 5 6/18/2015 Isolated (Future) C8C 10,013' 10,074' 9,659' 9,708' 61' 5 6/18/2015 Isolated (Future) C9B 10,420' 10,433' 9,976' 9,985' 13' 5 6/18/2015 Isolated (Future) C9C 10,580' 10,590' 10,091' 10,098' 10' 5 6/18/2015 Isolated (Future) C9C 10,634' 10,648' 10,129' 10,139' 14' 5 6/18/2015 Isolated (Future) C10 10,967' 10,972' 10,349' 10,352' 5' 5 6/18/2015 Isolated (Future) C11 11,440' 11,455' 10,596' 10,603' 15' 5 6/18/2015 Isolated (Future) C11 11,469' 11,499' 10,609' 10,621' 30' 5 6/18/2015 Isolated (Future) Hemlock 11,969' 11,983' 11,224’ 11,237' 14' 6 6/14/2015 Isolated Hemlock 12,047' 12,067' 11,299’ 11,319’ 20' 6 6/14/2015 Isolated Hemlock 12,084' 12,450' 11,335’ 11,689’ 366' 6 6/14/2015 Isolated Hemlock 12,450' 12,453' 11,689’ 11,692’ 3' 12 6/14/2015 Isolated Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Doyon 15 Date: November 18, 2013 Surface Data Logging End of Well Report SP08-N7 SP08-N7L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Show Reports 7. Mud Record 8. Bit Record 9. Morning Reports 10. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Doyon 15 Well: SP08-N7 & SP08-N7L1 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-629-23501-00-00 (SP08-N7) 50-629-23501-60-00 (SP08-N7L1) Sperry Job Number: AK-AM-0900797980 Job Start Date: 02 October 2013 Spud Date: 03 October 2013 Total Depth: 15,870’ MD, 3997’ TVD (SP08-N7) 15,977’ MD, 4009’ TVD (SP08-N7L1) North Reference: True North Declination: 19.643° Dip Angle: 81.049° Total Field Strength: 57632 nT Date Of Magnetic Data: 27 Oct 2013 Wellhead Coordinates N: North 70° 33’ 28.12597” Wellhead Coordinates W: West 149° 54’ 15.23805“ Drill Floor Elevation 53.93’ Ground Elevation: 13.10’ Permanent Datum: Mean Sea Level SDL Engineers: A. Paul Kalenuik, Leigh Ann Rasher, Kori Jo Plowman, Martin Nnaji, Jeremy Tiegs SDL Sample Catchers: Jade Miller, Hilary Garney, Jason Ostrem, Jeff Manook Company Geologist: Andrew Buchanan Company Representatives: Jack Keener, Mike Ross SSDS Unit Number: 110 DAILY SUMMARY 10/02/2013 SDL continues on location from previous well. Spot and set mudlogging shacks. Wait on the unit to warm up before rigging up. Pipe shed was loaded with drill pipe and heavy weight drill pipe. Began rigging up and ran gas line to the unit. Rig up network connection with MWD and WITS to Canrig. 10/03/2013 Pick up BHA #1 and fill conductor with spud mud. Pressure test surface equipment and clean out conductor to 160’ MD. Lay down clean out BHA and picked up BHA #2 and drilled ahead to779’ MD as of midnight. Gas: The max gas was 11 units at 720’ MD. The average gas was 5 units. Geology: Spot sample was 80% sandstone, 10% clay, and 10% shale 10/04/2013 Continue drilling 16” surface section from 779’ MD to 2659’ MD. Gas: The max gas was 180 units at 2318’ MD. The average gas was 73 units. 10/05/2013 Rig up casing equipment for surface casing. Make up 13 3/8” shoe track and test FC equipment. Run casing from 122’ MD to 633’ MD. 10/06/2013 Run casing from 633’ MD to 2640’ MD. Pick up and mak e up landing joint, break circulation and land hanger shoe at 2677’ MD. Cement surface casing and lay down landing joint. Calibrate gas gear and test it for accuracy. It is operating within normal parameters. 10/07/2013 Loaded shed with BHA #3 and made up 5” drill pipe stands via the mouse hole. Then racked 180 joints drill pipe onto the derrick. Tested BOP’s and then set the wear bushing. Then rigged down testing equipment and pulled up the BHA tools to the rig floor. 10/08/2013 Pull up BHA #3 per Directional Driller and MWD using Scorpion torque unit. Then loaded 9 5/8” casing in pipe shed and repaired top drive leak. Pulled up 4.5” drill pipe via the mouse hole and racked in the derrick. 10/09/2013 Pick up BHA #3. Run in hole to 1012' MD and perform MWD shallow hole test at 650’ MD. Continue to run in hole and tag float at 2594' MD. Drill out 13 3/8" shoe at 2674' MD. Drill 20' rat hole to 2712' MD. Gas: The max gas was 26 units. The average gas was 3 units. Geology: 90% sandstone and 10% clay. 10/10/2013 Cut and slip drill line. Run in hole and begin to wash and ream from 2611' MD to 2719' MD. Drill ahead through 12.25” intermediate section to 2770' MD. Gas: The max gas was 33 units at a depth of 2770’ MD. The average gas was 14 units. Geology: 70% sandstone and 30% siltstone. 10/11/2013 Drill ahead through 12.25" intermediate section from 2770' MD to 4683’ MD. Gas: The max gas was 41 units at a depth of 4683’ MD. The average gas was 7 units. Geology: 100% sandstone 10/12/2013 Drill ahead through 12.25” intermediate section from 4683’ MD to 5649’ MD. Gas: The max gas was 14 units at a depth of 5228’ MD. The average gas was 3 units. Geology: 90% siltstone and 10% sandstone 10/13/2013 Drill ahead through 12.25” intermediate section from 5649’ MD to 5755’ MD. Afterwards we monitored the well and conditions were static. We then back reamed out of hole to 2611’ MD. Then we pulled out of hole to 2144’ MD. Gas: The max gas was 24 units at a depth of 5740’ MD. The average gas was 4 units. Geology: 60% siltstone and 30% sandstone 10% clay 10/14/2013 Pull out of the hole to 361’ MD. We then monitored the well and the condition was static. They then laid down the BHA and picked up a 12.25” PDC bit and RIH to 1011’. MWD did a shallow test that went good. The hole was washed and reamed from 5598’ to 5755’ at the drill rate. They then drilled to 6342’ MD. Gas: The max gas was 28 units at a depth of 6342’ MD. The average gas was 16 units. Geology: 65% sandstone 25% siltstone 10% clay 10/15/2013 Drilled 12.25” hole from 6342’ MD to TD at 8045’ MD. There were no drilling losses. Begin back reaming out of hole. Gas: The max gas was 1290 units at a depth of 7228’ MD. The average gas was 120 units. Geology: 60% sandstone 40% siltstone 10/16/2013 Continue to back ream out of hole. Pull out of hole and lay down BHA #5. Begin to run 9 5/8” casing to 168’ MD. 10/17/2013 Float 9 5/8” casing to 2181’ MD. Run in hole to 6652’ MD. Start rotating casing to 8030’ MD. Circulate and condition hole. 10/18/2013 Condition hole while Cementers work on pump. Cement 9 5/8” casing. Drop bottom plug and test lines. Drop top plug. Rig down cement equipment. Nipple down BOPE. Set 9 5/8” emergency slips. Install packoff and test. Nipple up BOPE. Freeze protect OA sands. 10/19/2013 Service rig and top drive. Pick up 60 joints of 4.5” drill pipe. Test BOPE’s. Rig down test equipment and pull test plug. Set wear ring. Rig up wireline and function test. Run in hole with tractor and CBL. There were intermittent communication issues. Pull out of hole with wireline and CBL tool. Run in hole with wireline to 7950’ MD and begin logging out of the hole. 10/20/2013 Rig down wireline. Test 9 5/8” casing. Pick up BHA #6. Run in the hole, wash down and tag the plug at 7941’ MD. Displace to 9.25 lb/gal FazePro mud. Clean surface equipment, cut and slip drill line. Drill shoe track, shoe, and 21’ rat hole to 8065’ MD. Pull out of hole to 7899’ MD to circulate for FIT. 10/21/2013 Condition hole, rig up to perform FIT, then rig down equipment. Drill 8.75” production hole from 8065’ MD to 9568’ MD. Gas: The max gas was 4108 units at 8825’ MD. The average gas was 1108 units. Geology: Samples consist mainly of Sandstone 10/22/2013 Continue to drill from 9596’ MD to 11302’ MD. Mud weight increased from 9.15 ppg to 9.3 ppg by 0.5 ppg increments due to high gas. Gas: The max gas observed was 5727 units at 10889’ MD. The average gas was 1753 units. Geology: Samples consisted mainly of sandstone with some local silts. 10/23/2013 Continue to drill from 11302’ MD to 13958’ MD. Gas: The max gas observed was 4200 units at 11271’ MD. The average gas was 961 units. Geology: Samples consisted mainly of sandstone with some local silts. 10/24/2013 Continue to drill from 13958’ MD to 15728’ MD. Serviced top drive, block, and drawworks. Gas: The max gas observed was 5300 units at 14820’ MD. The average gas was 1682 units. Geology: Samples consisted mainly of sandstone with some local silts. 10/25/2013 Continue to drill from 15728’ MD to production section TD of 15870’ MD. Begin to back ream out of the hole per K&M representative. Gas: The max gas observed was 1640 units at 15828’ MD. The average gas was 828 units. Geology: Samples consisted mainly of sandstone with some local silts. 10/26/2013 Continue to back ream out of the hole per K&M representative. Circulate bottoms up and monitor the well, static. Continue to pull out of the hole. Lay down BHA #6 and rig up to run in hole with 5.5” liner. Gas: The max gas observed was 12 units while tripping out of the hole. 10/27/2013 Continue to run in the hole with 5.5” liner. Make up liner assembly and continue to run in the hole with 5” drill pipe. Set liner and pull out of the hole. Test BOP’s. 10/28/2013 Continue to test BOP’s. Make up and pick up whip stock BHA. RIH with whip stock BHA and begin milling window at 7791’ MD. Gas: The max gas observed was 19 units and the average gas was 10 units. Geology: Spot sample collected at 7801’ MD consisted of 100% sandstone. 10/29/2013 Continue to mill window. Top of the window is at 7791’ MD and bottom of the window is at 7808’ MD. Continue milling operations to 7838’ MD. Drop ball and pump sweep. Pull out of the hole and lay down whip stock BHA. Make up and pick up BHA #8. Begin to run in the hole. Gas: The max gas observed was 19 units and the average gas was 14 units. 10/30/2013 Continue to run in the hole. Perform leak off test at 7791’ MD to 11.61 ppg. Drill ahead from 7838’ MD to 8038’ MD. Circulate bottoms-up and pull out of the hole. Lay down BHA #8 and pick up BHA #9. Perform rig maintenance. Begin to run in the hole. Gas: The max gas observed was 32 units and the average gas was 21 units. Geology: Samples consisted of 50% sandstone and 50% siltstone. 10/31/2013 Continue to run in the hole. Drill ahead from 8038’ MD to 9363’ MD. Gas: The max gas observed was 2555 units at 8652’ MD and the average gas was 811 units. Geology: Samples consisted of mostly siltstone with some sandstone from 8038’ MD to 8500’ MD. There was abundant sandstone from 8500’ MD to 9363’ MD. 11/01/2013 Continue to drill ahead from 9363’ MD to 9664’ MD. Begin to pull out of the hole due to tool failure. Lay down BHA #9. Pick up BHA #10 and run in the hole. Gas: The max gas observed was 2815 units at 9304’ MD and the average gas was 1114 units. Geology: Samples consisted of 100% sandstone. 11/02/2013 Continue to run in hole with BHA #10. Drill ahead from 9664’ MD to 10454’ MD. Gas: The max gas observed was 2176 units at 9890’ MD and the average gas was 941 units. Geology: Samples consisted of 100% sandstone with 30%-50% siltstone. 11/03/2013 Drill ahead from 10454’ MD to 10548’ MD. Begin to pull out of hole due to MWD tool failure. Gas: The max gas observed was 540 units at 10521’ MD and the average gas was 312 units. Geology: Samples consisted of 50%-70% sandstone with 30%-50% siltstone. 11/04/2013 Continue to pull out of hole and lay down BHA #10. Pick up BHA #11 and being to run in hole. Shallow hole test tools and fail. Pull out of the hole and lay down BHA #11. Pick up BHA #12 and run in the hole. Drill ahead from 10548’ MD to 10696’ MD. Gas: The max gas observed was 2092 units at 10691’ MD and the average gas was 777 units. Geology: Samples consisted of 80% sandstone with 20% siltstone. 11/05/2013 Continue to drill ahead from 10696' MD to 12837' MD. Gas: The max gas observed was 3636 units at 11500’ MD and the average gas was 1093 units. Geology: Samples have consisted of 100% sandstone. 11/06/2013 Continue to drill ahead from 12837' MD to 14955' MD. Gas: The max gas observed was 3186 units at 14558’ MD and the average gas was 781 units. Geology: Samples consisted of 100% sandstone. 11/07/2013 Continue to drill ahead from 14955' MD to TD of 15977' MD. Began to back ream out of hole per K&M representative. Gas: The max gas observed was 2018 units at 15891’ MD and the average gas was 667 units. Geology: Samples consisted of 90% sandstone and 10% siltstone. 11/08/2013 Continue to back ream out of hole to window. Pull out of hole and begin to lay down BHA. Gas: The max gas observed was 71 units. 11/09/2013 Lay down BHA #12. Run in hole to retrieve whipstock and pull out of hole. 11/10/2013 Lay down whipstock and rig up to run in hole with 5.5” liner. Run in hole and tag TOL @ 7856’ MD. Work liner through window and continue to run in hole. 11/11/2013 Continue to run in hole with 5.5” liner to 15828’ MD. Displace well to brine and begin to lay down drill pipe. 11/12/2013 Continue to lay down drill pipe. Pull wear ring and install test plug and test BOP’s. Finish laying down drill pipe. Prepare for completions equipment and pump assembly. Rig up for wireline. 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 0 5 10 15 20 25 30 35 40 45 Me a s u r e d D e p t h Rig Days Prognosed Actual Days vs. Depth 02 Oct 2013 Sperry SDL continues on location from previous well WELL NAME: SP08-N7 & SP08-N7L1 OPERATOR: ENI Petroleum MUD CO: MI Swaco RIG: Doyon 15 SPERRY JOB: AK-AM-0900797980 LOCATION: North Slope AREA: Spy Island STATE: Alaska SPUD: 3 Oct 2013 TD: 7 Nov 2013 Commenced 16" Surface Hole Section On Bot: 07:30 02 Oct 2013 Commenced 12.25" Intermediate Hole Section On Bot: 22:05 09 Oct 2013 TD Surface Hole Section 2692' MD, 2692' TVD Off Bot: 00:20 04 Oct 2013 POOH for Bit Change Off Bot : 09:25 10 Oct 2013 On Bot: 22:20 10 Oct 2013 POOH for Bit change Off Bot: 13:25 13 Oct 2013 On Bot: 17:00 14 Oct 2013 Landed 13 3/8" Casing 2677' MD, 2471' TVD 06 Oct 2013 TD Intermediate Hole Section 8030' MD, 4067' TVD Off Bot: 14:00 15 Oct 2013 Landed 9 5/8" Casing 8030' MD, 4069' TVD 17 Oct 2013 Commenced 8.75" Production Hole Section On Bot: 02:30 21 Oct 2013 TD Production Hole Section 15870' MD, 3997' TVD Off Bot: 04:30 25 Oct 2013 Commenced 8.75" L1 Production Hole Section On Bot: 04:00 30 Oct 2013 POOH for Tool Failure Off Bot: 05:50 01 Nov 2013 On Bot: 10:40 02 Nov 2013 POOH for Bit Change Off Bot: 09:10 30 Oct 2013 On Bot: 06:30 31 Oct 2013 TD Production Hole Section 15977' MD, 4008' TVD Off Bot: 14:10 07 Nov 2013 POOH for Tool Failure Off Bot: 01:30 03 Nov 2013 On Bot: 22:00 04 Nov 2013 WELL NAME:LOCATION:North Slope OPERATOR:AREA:Spy Island SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION Surface EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 ENI Petroleum AK-AM-0900797980 Paul Kalenuik 4-Oct-2013 SP08-N7 What went as, or better than, planned: No major difficulties were experienced. The Canrig computer did freeze towards the beinning of the section and was fixed by closing out the RigWatch program and restarting it. The bit depth got thrown off a few times during connections. Recommendations: Innovations and/or cost savings: Surface section was completed without major problems. Gas chromatograph worked fine and within parameters. Difficulties experienced: Check your bit depth during each connection to make sure it stays on track. N/A Surface Data Logging After Action Review WELL NAME:LOCATION:North Slope OPERATOR:AREA:Spy Island SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION:Intermediate EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 What went as, or better than, planned: Some difficulties were experienced. The Gas Chromatograph would just stop running on two different occasions. This caused a sixty foot gap on our logs. Recommendations: Innovations and/or cost savings: Intermediate section was completed without any major issues. Difficulties experienced: Check your bit depth during each connection to make sure it stays on track. Replaced the H2 Generator with backup unit and the 8900 Chromatograph. The Geni filter was replaced. N/A ENI Petroleum AK-AM-0900797980 Paul Kalenuik 16-Oct-2013 SP08-N7 Surface Data Logging After Action Review WELL NAME:LOCATION:North Slope OPERATOR:AREA:Spy Island SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 What went as, or better than, planned: At the beginning of the production run, TVD was not tracking correctly. This was fixed by going into the Survey Descriptor and making adjustments. Recommendations: Innovations and/or cost savings: Production section was completed with no major issues. We experienced no failures from CanRig and our depth tracked fairly well. Difficulties experienced: Go through and check Descriptors before starting a new section or run. N/A ENI Petroleum AK-AM-0900797980 Kori Jo Plowman 29-Oct-2013 SP08-N7 Surface Data Logging After Action Review WELL NAME:LOCATION:North Slope OPERATOR:AREA:Spy Island SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 ENI Petroleum AK-AM-0900797980 Leigh Ann Rasher 10-Nov-2013 SP08-N7 L1 What went as, or better than, planned: The GC (8900) had issues connecting to IRIS after run changes. Also, the GC was not calibrated correctly prior to the L1 section. The C3 and C4 norm were calibrated to read 10x their ppm. Lag was approx 40-50-bbls off prior to the L1 section. Pump configurations were off slightly. Hydrogen generator was leaking pressure. Recommendations: Innovations and/or cost savings: L1 production section was completed with no major issues. The THA(8800) was switched out to the newer THA (9000) and worked without any issues. Difficulties experienced: The GC will be changed out to SDL ready GC recieved from town a few weeks ago to resolve connectivity issues. Need to make sure to check GC gas concentrations when calibrating the equipment to make sure they are correct. Also all configurations should be checked after each run (pumps, lag, etc.). If a lag adjustment is made it should be communicated to other loggers to avoid issues. Make sure hydrogen generator poly flow connectioin is on tight enough to avoid any leaks which may cause drops in pressure. N/A Surface Data Logging After Action Review WELL NAME:SP08-N7 & SP08-N7L1 LOCATION:Spy Island OPERATOR:ENI Petroleum AREA:North Slope MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:3-Oct-2013 SPERRY JOB:AK-AM-0900797980 TD:7-Nov-2013 Marker MD INC AZ TVD TVDSS 16"Surface Borehole 20" Conductor Shoe 160.0 0.6 234.1 160.0 -106.1 SV-4 768.0 8.0 138.9 767.4 -713.5 SV-3 1,137.0 21.9 139.1 1,122.4 -1,068.5 SV-2 1,422.0 29.0 140.3 1,379.0 -1,325.1 Permafrost Base 1,860.0 27.4 140.0 1,769.0 -1,715.1 SV-1 2,055.0 29.7 130.3 1,938.7 -1,884.8 Ugnu Top (UG4)2,429.0 31.3 103.1 2,262.2 -2,208.3 13 3/8" Casing Shoe 2,677.0 33.5 85.9 2,471.7 -2,417.7 TD 16" Borehole 2,692.0 33.6 84.9 2,484.3 -2,430.3 12 1/4" Intermediate Borehole UG-2 Coal Bed Marker 3,140.0 45.3 70.0 2,835.3 -2,781.4 Lower Ugnu 5,232.0 77.7 27.3 3,571.9 -3,518.0 Schrader Bluff 6,836.0 79.7 338.6 3,890.5 -3,836.6 N Sequence Top 6,976.0 78.9 334.0 3,911.8 -3,857.9 N Sand Top 7,229.0 80.8 329.1 3,955.4 -3,901.5 N2 7,276.0 81.7 327.3 3,962.2 -3,908.3 N3 7,364.0 82.8 324.6 3,974.0 -3,920.1 N Sand Bottom 7,486.0 83.1 322.1 3,988.9 -3,935.0 N Sequence Base 7,675.0 80.4 311.9 4,016.6 -3,962.7 9 5/8" Casing Shoe 8,030.0 84.4 309.7 4,067.9 -4,014.0 TD 12 1/4" Borehole 8,045.0 84.8 309.9 4,068.9 -4,015.0 8 3/4" Lateral OA Sand Top 8,320.0 84.3 310.5 4,098.8 -4,044.9 OA-2 Top 8,363.0 85.5 310.8 4,102.7 -4,048.8 OA-3 Top 8,416.0 86.4 311.5 4,106.5 -4,052.6 OA-3 Top 10,074.0 93.2 307.3 4,096.2 -4,042.3 OA-2 Top 10,192.0 92.4 306.2 4,090.3 -4,036.4 OA-2 Top 11,203.0 88.5 315.7 4,078.8 -4,024.9 OA-3 Top 11,263.0 86.6 315.0 4,081.3 -4,027.4 Fault 3 12,508.0 94.0 309.4 4,050.4 -3,996.5 OA Top 12,601.0 93.4 308.6 4,044.3 -3,990.4 OA Top 12,767.0 87.8 308.3 4,042.3 -3,988.4 OA-2 Top 14,033.0 87.7 308.5 4,040.5 -3,986.6 OA-3 Top 14,109.0 87.3 308.6 4,043.7 -3,989.8 OA-4 Top 15,154.0 87.4 312.0 4,054.1 -4,000.2 Fault 4 15,186.0 87.0 312.2 4,055.5 -4,001.6 OA Bottom 15,732.0 98.5 311.6 4,020.9 -3,967.0 OA-4 Top 15,762.0 99.4 311.9 4,016.6 -3,962.7 TD 8 3/4" Borehole 15,870.0 100.5 313.7 3,997.0 -3,943.1 Formation Tops WELL NAME:SP08-N7 & SP08-N7L1 LOCATION:Spy Island OPERATOR:ENI Petroleum AREA:North Slope MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:3-Oct-2013 SPERRY JOB:AK-AM-0900797980 TD:7-Nov-2013 Marker MD INC AZ TVD TVDSS 8 3/4 " Lateral L1 TOW 7,791.0 80.3 307.6 4,035.5 -3,981.6 BOW 7,808.0 80.6 307.8 4,038.3 -3,984.4 OA-1 Top 8,520.0 87.4 308.5 4,092.5 -4,038.6 OA-2 Top 9,779.0 87.8 308.6 4,076.3 -4022.4 OA-3 Top 9,830.0 87.7 310.5 4,078.3 -4024.4 OA-4 Top 10,236.0 89.3 312.8 4,089.4 -4035.5 OA-4 Top 10,570.0 92.5 314.2 4,091.6 -4037.6 Fault 3 10,857.0 94.2 313.5 4,071.7 -4017.7 OA-1 Top 10,952.0 93.2 313.2 4,065.1 -4011.2 OA-1 Top 11,114.0 88.9 312.2 4,062.7 -4008.7 OA-1 Top 11,615.0 92.1 311.4 4,050.4 -3996.5 OA-1 Top 11,711.0 89.7 311.1 4,048.6 -3994.6 Fault 4 11,994.0 90.4 311.9 4,051.6 -3997.7 OA-3 Top 13,425.0 92.0 312.7 4,045.1 -3991.2 OA-2 Top 13,495.0 92.5 312.7 4,042.4 -3988.4 Fault 5 15,118.0 91.8 312.7 4,038.4 -3984.4 OA Bottom 15,268.0 94.7 312.3 4,027.2 -3973.3 OA-4 Top 15,325.0 93.3 312.0 4,023.1 -3969.2 Fault 6 15,648.0 90.8 310.3 4,018.5 -3964.5 OA-2 Top 15,722.0 91.5 310.9 4,017.0 -3963.1 OA-1 Top 15,908.0 92.6 310.9 4,010.9 -3957.0 TD 8 3/4" Borehole 15,977.0 92.7 310.8 4,009.1 -3955.2 Formation Tops Show Report Report # 1 Show Report Report # 1 Well Name: Depth (MD) to ft Location: (TVD) to ft SP08-N7 Spy Island 9970 4099 8756 4109 Location: (TVD) to ft Operator: Report Prepared By: Formation: Spy Island ENI Petroluem Kori Jo Plowman 4099 4109 OA-Sand Report Prepared By: Formation: Report Delivered To: Date: 30-Oct-2013 Kori Jo Plowman Andrew Buchanan OA-Sand Interpretation: Interpretation: No producible oil within these zones based upon gas and chromatograph data collected. Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 77000 8825 4108 1 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 77000 8825 4108 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =1906 389648 391554 267 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 - =C1/C4 = 1906 389648 735 1308 547 17 530 1470 12 391554 267 1458 NPH C4 - =C1/C5 = C5 - = 547 17 530 325 27 94 4190 298 1 93 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 2 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 9058 3405 75000 2 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 =1246 354661 351255 1234 12 285 721 3406 10 C2 -=C1/C3 = C3 - =C1/C4 = C4 - =C1/C5 =3314 1246 1234 12 721 995 15 487 370 17 502 353 Oil C4 C1/C5 = C5 - = Production 3314 370 17 353 106 0 106 1 NPH Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 75000 2649 9522 3 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 75000 2649 9522 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =269 292716 17604 275112 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 =C1/C4 = 269 691 576 292716 17604 275112 1084 62 1022 550 478 72 NPH C3 =C1/C4 = C4 - =C1/C5 = C5 -= 691 2237 72 398 123 19 142 550 478 470 72 NPH C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 123 19 142 4 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 68000 2088 9961 4 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 =537 252 225945 934 38 896 237919 11974 10 Oil C2 -=C1/C3 = C3 - =C1/C4 = C4 -=C1/C5 = 537 616 2627 31 421 425 58 367 934 38 896 452 NPH C4 -=C1/C5 = C5 - = Production 2627 0.00 425 58 367 143 57 86 1 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Show Report Report # 2 Show Report Report # 2 Well Name: Depth (MD) to ft Location: (TVD) to ft 11278 4081 10344 4085 SP08-N7 Spy Island Location: (TVD) to ft Operator: Report Prepared By: Formation: 4081 4085 OA-Sand Spy Island ENI Petroluem Kori Jo Plowman Report Prepared By: Formation: Report Delivered To: Date: OA-Sand 30-Oct-2013 Kori Jo Plowman Andrew Buchanan Interpretation: No producible oil within these zones based upon gas and chromatograph data collected. Interpretation: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 1 70000 10440 4481 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 70000 10440 4481 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =402069 257 378910 23159 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 - =C1/C4 = 402069 257 1476 562 74 488 1552 76 378910 776 1207 23159 NPH C4 - =C1/C5 = C5 - =33 111 144 3414 314 562 74 488 395 81 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 2 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 2 70000 10889 5727 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 = 17565 289 1014 1554 445593 428028 1482 72 10 C2 -=C1/C3 = C3 - =C1/C4 = C4 - =C1/C5 = 80 422 335 105 502 230 1014 1861 1554 1482 72 4459 Oil C4 C1/C5 = C5 - = Production 135 39 96 335 105 230 4459 1 NPH Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 3 4362 11014 69000 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 4362 11014 69000 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =401296 34112 367184 327 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 =C1/C4 =462 390 72 1208 86 1122 401296 34112 367184 941 1360 327 NPH C3 =C1/C4 = C4 - =C1/C5 = C5 -= 462 390 345 72 117 75 270 103 14 1360 3565 NPH C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 4 117 103 14 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 4 4199 11269 69000 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 = 388206 11187 1244 43 1201 377019 790 314 10 Oil C2 -=C1/C3 = C3 - =C1/C4 = C4 -=C1/C5 =421 96 325 1244 43 1201 540 63 477 790 1160 3887 NPH C4 -=C1/C5 = C5 - = Production 136 39 97 421 96 325 0.00 3887 1 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Show Report Report # 3 Show Report Report # 3 Well Name: Depth (MD) to ft Location: (TVD) to ft 13985 4038 11651 4082 SP08-N7 Spy Island Location: (TVD) to ft Operator: Report Prepared By: Formation: 4038 4082 OA-Sand Spy Island ENI Petroluem Kori Jo Plowman Report Prepared By: Formation: Report Delivered To: Date: OA-Sand 30-Oct-2013 Kori Jo Plowman Andrew Buchanan Interpretation: No producible oil within these zones based upon gas and chromatograph data collected. Interpretation: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 1 68000 11737 1998 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 68000 11737 1998 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =221685 177 193142 28543 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 - =C1/C4 = 221685 177 1089 566 119 447 1192 103 193142 432 594 28543 NPH C4 - =C1/C5 = C5 - =67 86 153 2246 325 566 119 447 486 161 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 2 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 2 69000 12371 1838 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 = 34946 160 421 1128 195657 160711 1003 125 10 C2 -=C1/C3 = C3 - =C1/C4 = C4 - =C1/C5 = 165 382 532 231 547 301 421 534 1128 1003 125 2060 Oil C4 C1/C5 = C5 - = Production 175 97 78 532 231 301 2060 1 NPH Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 3 1748 13347 65000 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 1748 13347 65000 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =192227 13607 178620 116 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 =C1/C4 =1741 1632 109 1628 84 1544 192227 13607 178620 109 127 116 NPH C3 =C1/C4 = C4 - =C1/C5 = C5 -= 1741 1632 1551 109 242 149 1402 191 51 127 935 NPH C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 4 242 191 51 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 4 1889 13910 68000 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 = 210868 23896 1154 180 974 186972 725 192 10 Oil C2 -=C1/C3 = C3 - =C1/C4 = C4 -=C1/C5 =486 275 211 1154 180 974 505 247 258 725 886 2077 NPH C4 -=C1/C5 = C5 - = Production 168 78 90 486 275 211 0.00 2077 1 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Show Report Report # 4 Show Report Report # 4 Well Name: Depth (MD) to ft Location: (TVD) to ft SP08-N7 Spy Island 15103 4051 14450 4048 Location: (TVD) to ft Operator: Report Prepared By: Formation: Spy Island ENI Petroluem Kori Jo Plowman 4051 4048 OA-Sand Report Prepared By: Formation: Report Delivered To: Date: 30-Oct-2013 Kori Jo Plowman Andrew Buchanan OA-Sand Interpretation: Interpretation: No producible oil within these zones based upon gas and chromatograph data collected. Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 68000 14542 5165 1 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 68000 14542 5165 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =49082 375051 424133 216 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 - =C1/C4 = 49082 375051 567 850 768 106 662 1866 129 424133 216 1737 NPH C4 - =C1/C5 = C5 - = 768 106 662 573 132 182 3152 441 63 119 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 2 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 14727 4363 68000 2 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 =1688 396074 365916 1584 104 231 594 30158 10 C2 -=C1/C3 = C3 - =C1/C4 = C4 - =C1/C5 =2671 1688 1584 104 594 877 114 616 558 141 730 417 Oil C4 C1/C5 = C5 - = Production 2671 558 141 417 184 47 137 1 NPH Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 68000 5298 14820 3 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 68000 5298 14820 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =222 429075 28441 400634 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 =C1/C4 = 222 708 435 429075 28441 400634 1958 155 1803 1167 922 245 NPH C3 =C1/C4 = C4 - =C1/C5 = C5 -= 708 4006 303 566 100 100 200 1167 922 869 245 NPH C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 100 100 200 4 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 70000 2472 15085 4 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 =218 156 254594 1694 59 1635 264855 10261 10 Oil C2 -=C1/C3 = C3 - =C1/C4 = C4 -=C1/C5 = 218 287 1552 124 1169 1078 191 887 1694 59 1635 1293 NPH C4 -=C1/C5 = C5 - = Production 1552 0.00 1078 191 887 234 70 164 1 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 140 2 100 1 33 96 18 No producible oil within these zones based upon gas and chromatograph data collected. 66 21539123 6650086522555 179 138 151 0 306377 14546 26159304 188 23 88 561 40 500 216 486 5 418 107 12 138 138 37 179 47 241400 3960 229184 282236 2407 587 33 477 8487145 125 16 125 482 24 145 35 280071 67000 2241 1932 553 67000 1874 1661 5502 536 9015 270791 258575 468 17 2443 0 60 15 174 294357 77 0 1692 3345 2944 3820 2976 589 Interpretation: Show Report Report # 5 9304 4077 8652 4094 OA-Sand 1-Nov-2013 67000 548 SP08-N7L1 Spy Island ENI Petroluem Leigh Ann Rasher Andrew Buchanan 3918 6342 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 37 2 35 1 94 106 18 No producible oil within these zones based upon gas and chromatograph data collected. 88 209210691 6100098902176 87 87 94 0 338139 14546 318610812 144 23 121 506 40 466 145 352 5 347 22 12 153 241 37 165 204 238679 3960 234719 242165 2407 516 95 457 2509209 187 16 171 481 24 244 35 235823 67000 1379 1128 492 61000 1343 2698 1007 435 10068 207895 205488 418 17 1863 0 94 15 130 323593 22 0 2489 2674 9246 2497 10669 694 Interpretation: Show Report Report # 6 10812 4074 9890 4080 OA-Sand 5-Nov-2013 67000 676 SP08-N7L1 Spy Island ENI Petroluem Leigh Ann Rasher Andrew Buchanan 2335 6342 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 185 34 151 13 57 84 28 No producible oil within these zones based upon gas and chromatograph data collected. 56 128212439 61500113193450 193 146 322 47 147943 6404 132312650 389 77 312 607 44 563 246 505 65 440 154 34 153 227 74 187 153 143386 6666 136720 354567 17486 747 70 452 5920140 156 20 136 491 39 180 40 337442 65000 2481 2410 715 61500 2263 936 2263 547 11500 363780 346294 484 63 3636 111 211 30 216 141539 110 44 655 454 937 648 1243 251 Interpretation: Show Report Report # 7 12650 4061 11319 4061 OA-Sand 6-Nov-2013 65000 311 SP08-N7L1 Spy Island ENI Petroluem Leigh Ann Rasher Andrew Buchanan 6184 17125 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 157 50 107 53 45 169 48 No producible oil within these zones based upon gas and chromatograph data collected. 121 318614558 64000139551503 280 245 400 35 297356 12637 278514836 308 103 205 585 58 527 203 776 62 714 196 42 183 344 100 225 244 330097 20886 309211 169060 10903 319 98 481 3406121 198 43 155 542 61 226 105 153249 64500 989 1267 481 64000 1706 1262 1279 707 14236 323046 312143 649 58 3070 93 307 40 163 284719 146 50 1747 1389 2661 1007 2118 540 Interpretation: Show Report Report # 8 14836 4041 13955 4037 OA-Sand 6-Nov-2013 62000 433 SP08-N7L1 Spy Island ENI Petroluem Leigh Ann Rasher Andrew Buchanan 2580 15811 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH SP08-N7 & SP08-N7L1 ENI Petroleum MI Swaco Doyon 15 AK-AM-0900797980 Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++ 2-Oct 160 8.80 136 28 34 22/42/51 6.5 90/62/52/39/18/17 3/-3.0 1/96 ---9.6 21.0 .10/.25 1300 40 Rig up 3-Oct 514 8.90 110 23 37 25/49/58 -89/63/52/39/20/18 3/-5.0 2/93 0.25 0.15 10.1 22.0 .10/.26 2000 40 drilling 16" surface 4-Oct 2432 9.30 86 23 37 26/55/66 5.8 87/62/50/37/19/18 2/-7.0 1/92 0.25 0.15 9.5 22.5 .08/.25 1900 80 drilling 16" surface 5-Oct 2692 9.30 84 26 33 22/48/59 5.6 85/59/48/35/19/17 2/-4.0 1/95 0.25 0.15 9.5 22.5 .05/2.1 1300 60 running 13 3/8" casing 6-Oct 2692 9.20 40 13 7 3/4/5 6.2 33/20/16/10/4/3 ----------7.1 ----1300 --N/U BOP's 7-Oct 2692 9.20 40 13 7 3/4/5 6.2 33/20/16/10/4/3 ----------7.1 ----1300 --P/U & M/U BHA #3 8-Oct 2692 9.20 40 13 7 3/4/5 6.3 33/20/16/10/4/3 ----------7.1 ----1300 --P/U 4.5" DP 9-Oct 2692 9.20 43 9 12 3/4/5 --30/21/16/11/4/4 ----------9.4 ----1300 --Displacing to LSND 10-Oct 2719 9.20 49 9 28 11/13/15 6.3 46/37/32/26/13/11 1/-3.5 2/94.5 0.00 0.17 9.9 0.0 .05/.85 700 40 Drill 12.25" Hole 11-Oct 4649 9.20 47 10 26 11/18/23 5.2 46/36/31/25/12/11 1/-4.3 3/92.75 0.05 0.20 9.8 10.0 .10/.75 1100 40 Drill 12.25" Int. 12-Oct 5622 9.20 46 10 27 11/18/22 5.6 47/37/31/25/12/11 1/-5.0 3/92 0.05 0.20 9.8 12.5 .10/.85 1100 60 Drill 12.25" Int 13-Oct 5755 9.20 47 10 28 12/19/23 4.8 48/38/33/26/13/11 1/-5.0 3/92 0.02 0.15 9.7 12.5 .08/.85 1200 60 POOH:12.25" Int 14-Oct 6342 9.30 52 10 27 11/18/22 4.6 47/37/31/25/12/11 1/-5.3 3/91.75 0.02 0.15 9.9 12.5 .10/.80 1100 60 Drill 12.25" Int 15-Oct 8045 9.30 88 11 24 13/24/30 4.6 46/35/31/25/13/12 1/-6.3 3/90.75 0.05 0.10 9.6 15.5 .05/.70 1100 40 Drill 12.25" hole 16-Oct 8045 9.20 45 10 22 10/17/24 5.0 42/32/28/22/11/10 1/-6.3 3/90.75 0.05 0.10 9.6 15.0 .05/.65 1100 40 Float 9 5/8" casing 17-Oct 8045 9.20 48 11 24 11/19/26 5.2 46/35/30/24/12/10 1/-6.5 2.5/91 0.00 0.10 9.6 15.0 .05/.60 1100 40 Circulate and Condition 18-Oct 8045 9.20 46 10 14 7/10/14 5.2 34/24/22/17/8/7 1/-6.5 2.5/91 0.00 0.06 9.2 15.0 .02/.60 1100 60 Freeze protect OA Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG 19-Oct 8045 9.25 50 10 18 10/14/20 -38/28/24/19/10/9 1/----------Wireline: CBL 20-Oct 8045 9.20 46 13 18 7/7/8 -44/31/25/19/8/7 -6.51 64/36 2.95 3.84 410 29.36 -3.73/59.75 -Circulate hole/FIT 21-Oct 9163 9.20 43 12 17 7/7/8 4.0 41/29/24/18/8/7 -/2 7.20 67/33 2.75 3.58 715 28.46 -24.58/46.47 -Drill 8.75" Prod 22-Oct 10986 9.20 42 13 14 7/7/7 4.0 40/27/22/16/7/6 -/2 7.72 69/31 2.60 3.38 707 27.48 -35.61/37.24 -Drill 8.75" Prod 23-Oct 13542 9.30 45 15 17 7/8/8 3.8 47/32/26/19/8/7 -/1 8.22 70/30 2.30 2.99 630 29.36 -30.61/51.35 2.7 Drill 8.75" Prod 24-Oct 15523 9.30 46 14 20 7/8/8 3.8 48/34/28/20/8/7 -/2 8.24 70/30 2.30 2.99 687 29.68 -36.85/41.96 2.7 Drill 8.75" Prod 25-Oct 15870 9.30 44 13 16 6/7/7 -42/29/23/17/7/6 -/-8.43 70/30 1.95 2.54 600 28.42 -25.28/55.37 2.7 Circ & Cond 26-Oct 15870 9.35 42 13 16 6/7/7 -42/29/23/17/7/6 -/-8.51 70/30 2.20 2.86 605 28.80 -22.26/61.27 2.7 Run 5.5" Liner 27-Oct 15870 9.40 43 14 15 6/7/7 -43/29/23/17/7/6 -/-8.97 70/30 2.00 2.60 604 28.85 -14.32/72.46 2.8 Test BOPs 28-Oct 7808 9.30 45 14 16 6/7/7 -44/30/24/17/7/6 -/-7.74 69/31 2.2 2.86 710 31.13 -18.06/56.41 2.7 Milling Window Leg 1 29-Oct 7838 9.30 46 14 16 6/7/7 4.2 44/30/24/18/7/6 1/-8.06 69/31 2.20 2.86 685 28.05 -20.33/57.10 2.7 RIH 30-Oct 8038 9.30 46 14 18 7/7/7 4.0 46/32/26/18/7/6 -/1 8.24 70/30 2.2 2.86 700 28.27 -9.4/70.55 2.8 RIH w/BHA #9 31-Oct 9017 9.30 45 14 13 6/6/7 4.2 41/27/22/16/7/6 -/1 8.36 71/29 2.2 2.86 650 28.82 -5.93/75.54 2.8 Drill 8.75" L1 Prod 1-Nov 9664 9.30 43 13 16 6/7/7 4.6 42/29/23/16/7/6 -/1 8.98 72/28 2.00 2.6 620 28.37 -22.48/63.73 2.7 RIH w/BHA #10 2-Nov 10313 9.25 45 14 17 7/7/7 4.7 45/31/25/18/7/6 -/1 8.51 71/29 2.20 2.86 630 27.18 -20.37/61.38 2.7 Drill 8.75" L1 Prod 3-Nov 10548 9.25 45 14 16 6/7/7 4.6 44/30/24/17/7/6 -/1 8.22 71/29 2.30 2.99 630 29.04 -26.22/52.25 2.7 L/D BHA #10 4-Nov 10548 9.25 45 15 16 7/7/7 4.8 46/31/25/18/7/6 -/1 8.56 71/29 2.20 2.86 625 28.98 -49.09/30.98 2.7 Drill 8.75" L1 Prod 5-Nov 12462 9.25 47 15 17 7/7/8 4.9 47/32/26/19/8/7 -/1 8.8 71/29 2.00 2.60 615 27.05 -14.65/70.41 2.8 Drill 8.75" L1 Prod 6-Nov 14649 9.30 47 14 19 7/7/8 5.1 47/33/27/19/8/7 -/1 8.75 71/29 1.90 2.47 608.0 27.37 -12.96/71.76 2.8 Drill 8.75" L1 Prod 7-Nov 15977 9.25 48 15 19 7/7/8 -49/34/28/21/8/7 -/-8.51 71/29 2.25 2.93 610 27.18 -12.18/70.2 2.8 BROOH 9.75" Lateral 8-Nov 15977 9.3 48 15 18 7/7/8 -48/33/27/20/8/7 -/-8.43 69/31 1.90 2.47 640 26.84 -12.26/69.41 2.8 POH BHA #12 9-Nov 15977 9.3 51 14 19 7/7/8 -47/33/27/20/8/7 -/-8.53 70/30 1.90 2.47 620 27.13 -12.25/70.33 2.8 POH Whipstock 10-Nov 15977 9.30 51 14 19 7/7/8 -47/33/27/20/8/7 -/-8.5 70/30 1.90 2.47 615 27.1 -12.25/70.33 2.800 RIH 5.5" Liner L1 Casing Record Remarks 20" Conductor @ 160' MD, 160' TVD 13.375" Casing @ 2677' MD, 2471' TVD 9.625" Casing @ 8030' MD, 4068' TVD WELL NAME:LOCATION:Spy Island OPERATOR:AREA:North Slope MUD CO:STATE:Alaska RIG:SPUD:3-Oct-2013 SPERRY JOB:TD:7-Nov-2013 W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 2 200 1 Hughes MX-1 Milltooth 16.00 160 2692 2532 18.50 1.117 137.00 25 40 1500 700 1-1-WT-A-E-In-No-TD Surface TD 3 300 2 Hycalog SKHI716D-E10C PDC 12.25 2692 2720 28 3.80 0.969 7.3 15 160 1150 900 0-0-WT-A-X-In-No-PR ROP problems 4 400 3 Smith GF15B Insert 12.25 2720 5755 3035 40.80 0.969 74.4 25 130 1500 900 2-6-BT-G-E-2-WT-BHA Lack of DLS 5 500 4 Hycalog SKHI716D-E10C PDC 12.25 5755 8045 2290 11.00 0.969 208.9 10 160 1650 900 0-0-CT-A-X-I-N0-TD Intermediate TD 6 600 5 MDSi616 BPX Smith PDC 8.75 8045 15870 7825 60.30 0.902 129.8 10 160 3100 550 0-1-CT-Sh-X-In-No-TD Production TD 8 700 6RR Smith XR+ Milltooth 8.75 7838 8038 200 3.30 0.745 61.5 12 40 2220 550 0-0-WT-A-E-In-No-BHA BHA Change 9 800 7 Hycalog MDSi616M-E1D PDC 8.75 8038 9664 1626 13.30 0.902 122.1 10 120 2400 550 0-6-BT-G-X-1-CT-DTF Xceed Tool Failure 10 900 8 Hycalog MDSi616M-E1D PDC 8.75 9664 10548 884 8.00 0.902 111.1 10 150 2700 550 0-0-CT-N-X-IN-WT-DTF Xceed Tool Failure 11 1000 8RR Hycalog MDSi616M-E1D PDC 8.75 10548 10548 0 0.00 0.902 N/A N/A N/A N/A N/A 0-0-CT-N-X-IN-WT-DTF Xceed Tool Failure 12 1000 8RR2 Hycalog MDSi616M-E1D PDC 8.75 10548 15977 5429 32.60 0.902 166.8 10 150 2800 550 0-0-CT-N-X-IN-No-TD Production TD Alaska RIG:Doyon 15 SPUD:3-Oct-2013 WELL NAME:SP08-N7 & SP08-N7L1 LOCATION:Spy Island OPERATOR:ENI Petroleum AREA:North Slope MUD CO: SPERRY JOB:AK-AM-0900797980 TD:7-Nov-2013 MI Swaco STATE: B i t R e c o r d . . * 24 hr Recap: (max)(current) 0 0 Cly 908 Set AtSize Grade 20" 685-0772Unit Phone: 0 P.Kalenuik Maximum Report By:Logging Engineers:P. Kalenuik/ M. Nnaji 189 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 21.0136 C-5n 720' C-2 11 in 2Minimum Depth Time: BHA in shed. Load mud in pits. 5 160' 160' 0' Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Perry/R. Wimmer ShClyst TuffGvlCoal cP 28 Footage Ss (ppb Eq) C-1 C-5i AK-AM-0900797980 $2,810.00 $5,620.00 RIG UP PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.60 000 Gel Mud 6.5160'34 Depth in / out Mud Type Lst Type Average 1Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 160' WOB 100% Gas In Air=10,000 UnitsConnection 0 160'MD ConditionBit # 1 16"Hughes MX-1 8.80 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 1 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 2-Oct-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 1300.00 Rig up operations for pre spud acceptance. N/U speed head riser and test seals to 500 PSI for 10 minutes. Load Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:P/U BHA #1. Fill conductor with spud mud. Pressure test surface equipment. Clean out Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 2000.00 0 3-Oct-2013 12:00 AM Current Pump & Flow Data: 856 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report #2 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: ConditionBit # 1 5.0 16"Hughes MX-1 8.90 Size Spot sample : 80% sandstone, 10% clay, 10% shale @ 915' MD 160'MD 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 160' WOB 9.43 Avg Min Comments RPM ECD (ppg) ml/30min 1Background (max)Trip Average Mud Type Lst Type Gel Mud 6.2514'37 Depth in / out YP (lb/100ft2) 10.10 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900797980 drilling ahead PV Footage M.Ross/R. Wimmer ShClyst TuffGvlCoal cP 26 Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 160' 779' 619' Max @ ft Current 24.3 Date: Time: conductor T/160'. P/U BHA #2 SHT MWD, shoot gyro srvy, confirm srvy. M/U Remaining tools for BHA #2. Drill F/486' T/781' . 5 in 2Minimum Depth C-5n 720' 339.0 C-2 11 SPP (psi) Gallons/stroke TFABit Type Depth 22.0110 MBT 0' pH 1.117 0 0 0 Siltst 691 Units* Casing Summary Lithology (%) 0189 0 670-0772Unit Phone: 0 P.Kalenuik Maximum Report By:Logging Engineers:P. Kalenuik/ M. Nnaji Set AtSize Grade 20" (max)(current) 0 0 Cly 908 . . * 24 hr Recap:Con't drilling 16" surface F/781' T/2646' @ 650-700 GPM. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1900.00 0 4-Oct-2013 12:00 AM Current Pump & Flow Data: 1186 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 3 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: ConditionBit # 1 7.0 16"Hughes MX-1 9.30 Size 160'MD 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 160' WOB 9.76 Avg Min Comments RPM ECD (ppg) ml/30min 4Background (max)Trip Average Mud Type Lst Type Gel Mud 5.82432'37 Depth in / out YP (lb/100ft2) 9.50 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900797980 drilling ahead PV Footage M.Ross/R. Wimmer ShClyst TuffGvlCoal cP 25 Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 712.0 Flow In (gpm) Flow In (spm) 779' 2646' 1867' Max @ ft Current 829'81.4 Date: Time: 73 in 2Minimum Depth C-5n 2318' 0.0 C-2 180 SPP (psi) Gallons/stroke TFABit Type Depth 22.586 MBT 0' pH 1.117 0 0 0 Siltst 687 Units* Casing Summary Lithology (%) 08764 26 670-0772Unit Phone: 0 P.Kalenuik Maximum Report By:Logging Engineers:P. Kalenuik/ M. Nnaji Set AtSize Grade 20" (max)(current) 4 0 Cly 32212 . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1300.00 5-Oct-2013 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 4 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition Bit # 1 4.0 16" Hughes MX-1 9.30 Size 160'MD Tools API FL 160' WOB 9.76 Avg Min Comments RPM ECD (ppg) ml/30min Mud Type Lst Type Gel Mud 5.6 2692'33 Depth in / out YP (lb/100ft 2) 9.50 Cement Cht Silt 24 hr Max Weight Hours Ss (ppb Eq) AK-AM-0900797980 $3,810.00 $15,050.00 casing PV Footage M.Ross/R. Wimmer Sh Clyst Tuff Gvl Coal cP 26 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2646' 2692' 46' Max @ ft Current Date: Time: in 0.0 SPP (psi) Gallons/stroke TFA Bit Type Depth 22.5 84 MBT 0' pH 1.117 Siltst 13 3/8" Casing Summary Lithology (%) Set At Size Grade 20" Cly * 24 hr Recap: R/U Csq equipt. M/U 13 3/8" Shoe track & test FC equip. (GOOD) T/122'. Run 13 3/8" Csg F/122' T/633'. 0 100% Gas In Air =10,000 Units Connection 0 Chromatograph (ppm) Background (max) Trip Average 000 00 C-4i C-4n 0 C-3 C-1 C-5i Gas Summary 0 0 0 (current) Minimum Depth C-5n C-2 0 0 0 Units* 0 Unit Phone: 0 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ M. Nahji (max) (current) 4 0 . . BTC Cly Set At Size 178.9 X-65 Grade 20" 13 3/8" Casing Summary Lithology (%) L-80 MBT 0' pH 1.117 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 40 0.0 in Time: 2692' 2692' 0' Max @ ft Current Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) (current) M.Ross/R. Wimmer Sh Clyst Tuff Gvl Coal cP 13 2532' Footage Ss (ppb Eq) AK-AM-0900797980 $2,810.00 $17,860.00 cementing PV 24 hr Max 68.0 Weight Hours Cement Cht Silt YP (lb/100ft 2) 7.10 12.0 Gel Mud 6.2 2692'7 Depth in / out Mud Type Lst Type 9.76 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 3.2 160' 2692' WOB EVEMAR 2676'MD 160'MD Condition 1-1-WT-A-E-In-No-TD Bit # 2 16" Hughes MX-1 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 5 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 6-Oct-2013 12:00 AM Current Pump & Flow Data: Max Chlorides mg/l 1300.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max) (current) 0 0 Unit Phone: 0 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ M. Nahji Units* 0 0 0 0 C-5n C-2 Minimum Depth R/D Cement/Csq equip. L/D Landing jt. Test Well head to hanger neck seal T/2000 PSI F/10min. (Good Test). N/D Diverter line Gas Summary 0 0 0 (current) C-1 C-5i 0 C-3 00 C-4i C-4n 000 Average Background (max) Trip Chromatograph (ppm) 100% Gas In Air =10,000 Units Connection 0 cellar pup. Calibrate gas gear and test for accuracy. Operating within normal parameters. 0 Run 13 3/8" Csg F/633' T/2640'MD. P/U & M/U Landing Jt. Break Circ & land hanger shoe depth 2677'. . . * 24 hr Recap: (max)(current) BTC 0 0 Cly Set AtSize 178.9 X-65 Grade 20" Unit Phone: 0 P.Kalenuik Maximum Report By:Logging Engineers:P. Kalenuik/ j. Tiegs 13 3/8" Units* Casing Summary Lithology (%) 0 L-80 MBT 0' pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 40 C-5n 0.0 C-2 in Minimum Depth Time: R/U BOP test equip. Test BOP's (Good). Set wear bushing. R/D Testing equip. P/U BHA tools to rig floor. 2692' 2692' 0' Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) M.Ross/R. Wimmer ShClyst TuffGvlCoal cP 13 2532' Footage Ss (ppb Eq) C-1 C-5i AK-AM-0900797980 $3,410.00 $21,270.00 P/U BHA#3 PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 7.10 000 12.0 Gel Mud 6.22692'7 Depth in / out Mud Type Lst Type Average Background (max)Trip 9.76 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 3.2160' 2692' WOB EVEMAR 100% Gas In Air=10,000 UnitsConnection 0 2676'MD 160'MD Condition 1-1-WT-A-E-In-No-TD Bit # 2 16"Hughes MX-1 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 6 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 4.23 @ Mud Data Depth 7-Oct-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 1300.00 Load shed with BHA #3. P/U & M/U 5" DP stds via mouse hole & rack back on derrick 180 jts. Set Test plug. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:P/U BHA #3 per SLB DD & MWD using Scorpion torque unit. Load 9-5/8" csg in pipe shed, repair top drive leak. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1300.00 0 8-Oct-2013 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 7 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 2 16"Hughes MX-1 9.20 Size 3 2676'MD 160'MD 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 3.2160' 2692' WOB EVEMAR 9.76 Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type 12.0 Hycalog PDC Gel Mud - 2692' 2692'7 Depth in / out YP (lb/100ft2) 7.10 000 00 CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900797980 $3,410.00 $24,680.00 P/U 4.5"DP PV 2532' 12.25 1.117 Footage M.Ross/R. Wimmer ShClyst TuffGvlCoal cP 13 Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2692' 2692' 0' Max @ ft Current Date: Time: P/U 4.5" DP via mousehole & rack in derrick. in Minimum Depth C-5n 0.0 C-2 SPP (psi) Gallons/stroke TFABit Type Depth 40 L-80 MBT 0' pH 1.117 0 0 0 Siltst 13 3/8" Units* Casing Summary Lithology (%) 0 Unit Phone: 0 P.Kalenuik Maximum Report By:Logging Engineers:P. Kalenuik/ j. Tiegs Set AtSize 178.9 X-65 Grade 20" (max)(current) BTC 0 0 Cly . . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1300.00 9-Oct-2013 12:00 AM Current Pump & Flow Data: 0 Max ROP ROP (ft/hr) 0.00 @ Mud Data Depth Morning Report Report # 8 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 2 16" Hughes MX-1 9.20 Size 3 2676'MD 160'MD Tools API FL 3.2 160' 2692' WOB EVEMAR 9.77 Avg Min Comments RPM ECD (ppg) ml/30min Mud Type Lst 90 Type 12.0 Hycalog PDC LSND - 2692' 2692'12 Depth in / out YP (lb/100ft 2) 9.40 Cement Cht Silt 24 hr Max 68.0 Weight Hours 10 Ss (ppb Eq) AK-AM-0900797980 $3,410.00 $28,090.00 Drilling Intermidate PV 2532' 12.25 1.117 Footage M.Ross/R. Wimmer Sh Clyst Tuff Gvl Coal cP 9 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2692' 2712' 20' Max @ ft Current Date: Time: in 0.0 SPP (psi) Gallons/stroke TFA Bit Type Depth 43 L-80 MBT 0' pH 1.117 Siltst 13 3/8" 0 0 Casing Summary Lithology (%) Set At Size 178.9 X-65 Grade 20" BTC Cly * 24 hr Recap: P/U BHA #3. RIH to 1012' MD & perform MWD shallow hole test @ 650. RIH to 2518' MD. 0 100% Gas In Air =10,000 Units Connection 0 Chromatograph (ppm) 0Background (max) Trip Average 90 000 00 C-4i C-4n 0 C-3 10 C-1 C-5i Gas Summary 0 0 0 (current) RIH, tag float at 2594' MD. Drill out 13 3/8" shoe at 2674'. Drill 20' rathole to 2712' MD / 2500' TVD. 3 0Minimum Depth C-5n C-2 26 0 0 0 Units* 0340 0 Unit Phone: 0 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ j. Tiegs (max) (current) 3 0 3192 . . BTC Cly Set At Size 178.9 X-65 Grade 20" 30 13 3/8" 746 Casing Summary Lithology (%) L-80 MBT 0' pH 1.117 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 0.0 49 0.0 in Time: 2712' 2770' 58' Max @ ft Current 2813'55.0 Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 339.0 Flow In (gpm) Flow In (spm) (current) J. Kenner/R. Wimmer Sh Clyst Tuff Gvl Coal cP 9 2532' 12.25 1.117 Footage Ss (ppb Eq) AK-AM-0900797980 $3,410.00 $31,500.00 Drilling Ahead PV 24 hr Max 68.0 Weight Hours Cement Cht Silt YP (lb/100ft 2) 9.90 12.0 Hycalog PDC LSND 6.3 2692' 2719'28 Depth in / out Mud Type Lst 70 Type 9.77 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 3.2 160' 2692' WOB EVEMAR 3 2676'MD 160'MD Condition 1-1-WT-A-E-In-No-TD Bit # 2 3.5 16" Hughes MX-1 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 9 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE ROP ROP (ft/hr) 0.00 @ Mud Data Depth 10-Oct-2013 12:00 AM Current Pump & Flow Data: 933 Max Chlorides mg/l 700.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max) (current) 0 0 3612 907-685-0772 Unit Phone: 0 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ J. Tiegs 30 1610 40 Units* 0 0 0 0 C-5n 2770' C-2 33 0Minimum Depth 14 Gas Summary 0 0 0 (current) C-1 C-5i 0 C-3 00 C-4i C-4n 000 70 Average 2Background (max) Trip Chromatograph (ppm) 100% Gas In Air =10,000 Units Connection 0 0 Cut & slip drill line. RIH. Wash & ream f/2611' to 2719'. Drill to 2770' MD / 2549' TVD at report time. ECD . . * 24 hr Recap: 4 SKHI7 16D-E1OC 12.25 1.117 Drill 12.25" hole f/2770' MD to 3738' MD / 3195' TVD. Monitor well.Static.ECD at 9.86 lb/gal. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1100.00 0 11-Oct-2013 12:00 AM Current Pump & Flow Data: 1501 Max 0-0-WT-A-X-In-No-PR ROP ROP (ft/hr) 0.00 @ Mud Data Depth Morning Report Report # 10 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 2 4.3 16"Hughes MX-1 9.20 Size 3 ECD at 9.62 lb/gal. Max Gas: 12 & 13 units. No losses noted. 2676'MD 160'MD 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 28 3.2160' 2692' WOB EVEMAR 0.00 Avg Min Comments RPM ECD (ppg) ml/30min 5Background (max)Trip Average Mud Type Lst 100 Type 159 12.0 Hycalog PDC LSND 5.2 2692' 4649'26 2717' Depth in / out YP (lb/100ft2) 9.80 000 00 CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900797980 $3,410.00 $34,910.00 Drilling Ahead PV 2532' 12.25 1.117 Footage 4.10 25' 18.80 J. Kenner/O. Amend ShClyst TuffGvlCoal cP 10 Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 673.0 Flow In (gpm) Flow In (spm) 2770' 4683' 1913' Max @ ft Current 4576'83.0 Date: Time: AM Max Gas: 4 & 20 units.No AM losses. Drill f/3738' MD to 4680' MD / 3456' TVD at report time. Monitor well.Static. 7 in 0Minimum Depth C-5n 4683' 140.0 C-2 41 SPP (psi) Gallons/stroke TFABit Type Depth 10.047 L-80 MBT 0' pH 1.117 0 0 0 Siltst 13 3/8" 905 Units* Casing Summary Lithology (%) 0724 0 907-685-0772Unit Phone: 46 P.Kalenuik Maximum Report By:Logging Engineers:P. Kalenuik/ J. Tiegs Set AtSize 178.9 X-65 Grade 20" (max)(current) BTC 0 0 Cly 5279 . . BTC Cly Set At Size 178.9 X-65 Grade 20" 90 13 3/8" 885 Casing Summary Lithology (%) L-80 MBT 0' pH 1.117 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 12.5 46 15.0 in Time: 4683' 5649' 966' Max @ ft Current 4664'38.0 Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 594.0 Flow In (gpm) Flow In (spm) (current) J. Kenner/O. Amend Sh Clyst Tuff Gvl Coal cP 10 2532' 12.25 1.117 Footage 4.10 25' 18.80 Ss (ppb Eq) AK-AM-0900797980 $3,410.00 $38,320.00 Drilling Ahead PV 24 hr Max 68.0 Weight Hours Cement Cht Silt YP (lb/100ft 2) 9.80 159 12.0 Hycalog PDC LSND 5.6 2692' 5622'27 2717' Depth in / out Mud Type Lst 10 Type 0.00 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 28 3.2 160' 2692' WOB EVEMAR 3 2676'MD 160'MD Condition 1-1-WT-A-E-In-No-TD Bit # 2 5.0 16" Hughes MX-1 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 11 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE 0-0-WT-A-X-In-No-PR ROP ROP (ft/hr) 0.00 @ Mud Data Depth 12-Oct-2013 12:00 AM Current Pump & Flow Data: 1497 Max % Chlorides mg/l 1100.00 Density (ppg) out (sec/qt) Viscosity Cor Solids 4 SKHI7 16D-E1OC 12.25 1.117 * 24 hr Recap: (max) (current) 9 0 1289 907-685-0772 Unit Phone: 46 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ J. Tiegs 90 374 0 Units* 0 0 4 0 C-5n 5228' C-2 14 10% Sandstone : trnsl-trnsp-wh-lt-med gy-blk, hd, med-f gr, ang-sb rnd, ply sort, abd cht, r pyr, tr glauc. 0Minimum Depth Monitor well. Static. ECD at 9.89 lb/gal. AM Max Gas: 3 & 10 units. No AM losses. Drill f/5316' MD to 5645' MD / 3648' TVD 3 Latest Sample : 90% Siltstone : blk-brn, v crs-crs gr, hd, ang, mo srt, r pyr. Gas Summary 0 0 0 (current) C-1 C-5i 0 C-3 00 C-4i C-4n 000 10 Average 1Background (max) Trip Chromatograph (ppm) 100% Gas In Air =10,000 Units Connection 0 at report time. Monitor well. Static. 0 Drill 12.25" hole f/4680' MD to 5316' MD / 3589' TVD at 776 to 897 gpm, 1230 to 1550 psi & 110 to 127 rpm. . . BTC Cly Set At Size 178.9 X-65 Grade 20" 60 13 3/8" 833 Casing Summary Lithology (%) L-80 MBT 0' pH 1.117 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 12.5 47 0.0 in Time: 5649' 5755' 106' Max @ ft Current 5744'31.0 Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 203.0 Flow In (gpm) Flow In (spm) (current) J. Kenner/O. Amend Sh Clyst Tuff Gvl Coal cP 10 2532' 12.25 1.117 Footage 4.10 25' 18.80 10 Ss (ppb Eq) AK-AM-0900797980 $3,410.00 $41,730.00 POOH PV 24 hr Max 68.0 Weight Hours Cement Cht Silt YP (lb/100ft 2) 9.70 159 12.0 Hycalog PDC LSND 4.8 2692' 5755'28 2717' Depth in / out Mud Type Lst 30 Type 0.00 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 28 3.2 160' 2692' WOB EVEMAR 3 2676'MD 160'MD Condition 1-1-WT-A-E-In-No-TD Bit # 2 5.0 16" Hughes MX-1 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 12 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE 0-0-WT-A-X-In-No-PR ROP ROP (ft/hr) 0.00 @ Mud Data Depth 13-Oct-2013 12:00 AM Current Pump & Flow Data: 1121 Max % Chlorides mg/l 1200.00 5755' Density (ppg) out (sec/qt) Viscosity Cor Solids 3038' 22 129 4 SKHI7 16D-E1OC 12.25 1.117 42.00 2717' * 24 hr Recap: (max) (current) 13 0 3016 907-685-0772 Unit Phone: 46 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ J. Tiegs 60 400 0 Units* 0 0 4 0 C-5n 5740' C-2 24 30% Sandstone : trnsl-trnsp-wh-lt-med gy-blk, hd, med-f gr, ang-sb rnd, ply sort, abd cht, tr pyr, tr glauc. 1Minimum Depth Overpull observed. BROOH at 900 gpm to 2611'. At 2611' 1st BU: 75% increase in 1" to 2" clay chunks. Circ total 3 BU. Monitor well. 4 Latest Sample : 60% Siltstone : blk-brn, v crs-crs gr, hd, ang, mo srt, tr pyr. 10% Clay Gas Summary 0 0 0 (current) 10 C-1 C-5i 4 C-3 00 C-4i C-4n 000 30 Average 1Background (max) Trip Chromatograph (ppm) 100% Gas In Air =10,000 Units Connection 5 10 min. Static. POH w/elevators to 2144' at report time. 0 Drill 12.25" hole f/5645' MD to 5755' MD / 3668' TVD. Monitor well. Static. PumpOH to 4440' due to level 3 shocks. . . 3038' 22 129 4 SKHI7 16D-E1OC 12.25 1.117 42.00 2717' 5755' Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1100.00 14-Oct-2013 12:00 AM Current Pump & Flow Data: 1450 Max 0-0-WT-A-X-In-No-PR ROP ROP (ft/hr) 0.00 @ Mud Data Depth Morning Report Report # 13 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 2 5.3 16" Hughes MX-1 9.30 Size 3 2676'MD 160'MD Tools API FL 28 3.2 160' 2692' WOB EVEMAR 0.00 Avg Min Comments RPM ECD (ppg) ml/30min Mud Type Lst 65 Type 159 12.0 Hycalog PDC LSND 4.6 2692' 6066'27 2717' Depth in / out YP (lb/100ft 2) 9.90 Cement Cht Silt 24 hr Max 68.0 Weight Hours 10 Ss (ppb Eq) AK-AM-0900797980 $3,410.00 $45,140.00 Drilling Ahead PV 2532' 12.25 1.117 Footage 4.10 25' 18.80 J. Kenner/O. Amend Sh Clyst Tuff Gvl Coal cP 10 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 374.0 Flow In (gpm) Flow In (spm) 5755' 6342' 587' Max @ ft Current 6345'100.0 Date: Time: in 240.0 SPP (psi) Gallons/stroke TFA Bit Type Depth 12.5 52 L-80 MBT 0' pH 1.117 Siltst 13 3/8" 883 Casing Summary Lithology (%) 25 Set At Size 178.9 X-65 Grade 20" BTC Cly * 24 hr Recap: POH to 361'. Monitor well. Static. L/D BHA. No AM Losses. P/U 12.25" PDC bit. RIH to 1011'. 0 100% Gas In Air =10,000 Units Connection 56 Chromatograph (ppm) 4Background (max) Trip Average 65 000 00 C-4i C-4n 0 C-3 10 C-1 C-5i Gas Summary 0 0 3 (current) Shallow test MWD. OK. RIH. Wash & ream f/5598' to 5755' at drill rate. Drill to 6342' MD / 3792' TVD. 16 Latest Sample : 65% Sandstone : trnsl-trnsp-wh-lt-med gy-blk, sft, med-v f gr, sb ang-sb rnd, ply srt, tr cht, tr pyr, v slty. 10% Clay 25% Siltstone : blk-brn, v crs-crs gr, hd, ang, mo srt, tr pyr. sort, abd cht, tr pyr, tr glauc. 0Minimum Depth C-5n 6342' C-2 28 0 25 0 Units* 0 25 1959 0 907-685-0772 Unit #110 Phone: 0 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ J. Tiegs (max) (current) 0 0 7246 . . BTC Cly Set At Size 178.9 X-65 Grade 20" 25 13 3/8" 895 Casing Summary Lithology (%) L-80 MBT 0' pH 1.117 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 15.5 51 0.0 in Time: 6342' 8044' 1702' Max @ ft Current 6345'76.0 Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 491.0 Flow In (gpm) Flow In (spm) (current) J. Kenner/O. Amend Sh Clyst Tuff Gvl Coal cP 11 2532' 12.25 1.117 Footage 4.10 25' 18.80 10 Ss (ppb Eq) AK-AM-0900797980 $3,410.00 $48,550.00 Drilling Ahead PV 24 hr Max 68.0 Weight Hours Cement Cht Silt YP (lb/100ft 2) 9.60 159 12.0 Hycalog PDC LSND 4.6 2692' 8045'24 2717' Depth in / out Mud Type Lst 65 Type 9.74 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 28 3.2 160' 2692' WOB EVEMAR 3 2676'MD 160'MD Condition 1-1-WT-A-E-In-No-TD Bit # 2 6.3 16" Hughes MX-1 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 14 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE 0-0-WT-A-X-In-No-PR ROP ROP (ft/hr) 0.00 @ Mud Data Depth 15-Oct-2013 12:00 AM Current Pump & Flow Data: 1540 Max % Chlorides mg/l 1100.00 5755' Density (ppg) out (sec/qt) Viscosity Cor Solids 3038' 22 129 4 SKHI7 16D-E1OC 12.25 1.117 42.00 2717' * 24 hr Recap: (max) (current) 304 0 161618 907-685-0772 Unit #110 Phone: 8 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ J. Tiegs 25 14778 0 Units* 6 0 173 0 C-5n 7228' C-2 1290 40% Siltstone : blk-brn, v f gr, hd, ang-sb rnd, mo srt. 0Minimum Depth 120 Latest Sample : 60% Sandstone : trnsl-trnsp-wh-lt-med gy-blk, sft, CRS-f gr, sb ang-sb rnd, ply srt, r glauc, tr pyr. Gas Summary 0 173 7 (current) 10 C-1 C-5i 28 C-3 00 C-4i C-4n 060 65 Average 0Background (max) Trip Chromatograph (ppm) 100% Gas In Air =10,000 Units Connection 391 32 Drill 12.25" hole f/6342' MD to TD at 8045' MD / 4070' TVD. No Drilling losses. . . 3038' 22 129 4 SKHI7 16D-E1OC 12.25 1.117 42.00 2717' 5755' Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1100.00 16-Oct-2013 12:00 AM Current Pump & Flow Data: Max 0-0-WT-A-X-In-No-PR ROP ROP (ft/hr) 0.00 @ Mud Data Depth Morning Report Report # 15 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 2 6.3 16" Hughes MX-1 9.20 Size 3 2676'MD 160'MD Tools API FL 28 3.2 160' 2692' WOB EVEMAR 9.42 Avg Min Comments RPM ECD (ppg) ml/30min Mud Type Lst 65 Type 159 12.0 Hycalog PDC LSND 5.0 2692' 8045'22 2717' Depth in / out YP (lb/100ft 2) 9.60 Cement Cht Silt 24 hr Max 68.0 Weight Hours 10 Ss (ppb Eq) AK-AM-0900797980 $3,410.00 $51,960.00 Float 9-5/8" Csg PV 2532' 12.25 1.117 Footage 4.10 25' 18.80 J. Kenner/O. Amend Sh Clyst Tuff Gvl Coal cP 10 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 8044' 8044' 0' Max @ ft Current Date: Time: in 0.0 SPP (psi) Gallons/stroke TFA Bit Type Depth 15.0 45 L-80 MBT 0' pH 1.117 Siltst 13 3/8" Casing Summary Lithology (%) 25 Set At Size 178.9 X-65 Grade 20" BTC Cly * 24 hr Recap: Cont BROOH f/5038' to 2611' at 900 gpm,1290 psi & 120 rpm. CBU x 5 at drill rate. POH. L/D BHA #5. Runni 100% Gas In Air =10,000 Units Connection Chromatograph (ppm) Background (max) Trip Average 65 C-4i C-4n C-3 10 C-1 C-5i Gas Summary (current) Run 9-5/8" csg to 168'. Check float. OK.. Latest Sample : 60% Sandstone : trnsl-trnsp-wh-lt-med gy-blk, sft, CRS-f gr, sb ang-sb rnd, ply srt, r glauc, tr pyr. 40% Siltstone : blk-brn, v f gr, hd, ang-sb rnd, mo srt. Minimum Depth C-5n C-2 Units* 25 907-685-0772 Unit #110 Phone: P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ J. Tiegs (max) (current) . . BTC Cly Set At Size 178.9 X-65 Grade 8030'MD 20" 9 5/8" 40 13 3/8" 80 Casing Summary Lithology (%) L-80 MBT 0' pH 1.117 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 15.0 48 0.0 in Time: 8044' 8044' 0' Max @ ft Current 0'0.0 Date: Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) (current) J. Kenner/O. Amend Sh Clyst Tuff Gvl Coal cP 11 2532' 12.25 1.117 Footage 4.10 25' 18.80 Ss (ppb Eq) AK-AM-0900797980 $3,410.00 $55,370.00 Circ & Condition PV 24 hr Max 68.0 Weight Hours Cement Cht Silt YP (lb/100ft 2) 9.60 159 12.0 Hycalog PDC LSND 5.2 2692' 8045'24 2717' Depth in / out Mud Type Lst 60 Type 9.74 Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 28 3.2 160' 2692' WOB EVEMAR 3 2676'MD 160'MD Condition 1-1-WT-A-E-In-No-TD Bit # 2 6.5 16" Hughes MX-1 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 16 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE 0-0-WT-A-X-In-No-PR ROP ROP (ft/hr) 0.00 @ Mud Data Depth 17-Oct-2013 12:00 AM Current Pump & Flow Data: 257 Max % Chlorides mg/l 1100.00 5755' Density (ppg) out (sec/qt) Viscosity Cor Solids 3038' 22 129 4 SKHI7 16D-E1OC 12.25 1.117 42.00 2717' * 24 hr Recap: (max) (current) 0 0 0 907-685-0772 Unit #110 Phone: 0 P.Kalenuik Maximum Report By: Logging Engineers: P. Kalenuik/ J. Tiegs 40 0 0 Units* 0 0 0 0 C-5n 0' C-2 0 40% Siltstone : blk-brn, v f gr, hd, ang-sb rnd, mo srt. 0 0'Minimum Depth Circ & condition hole; 2 bpm & 270 psi. 0 Latest Sample : 60% Sandstone : trnsl-trnsp-wh-lt-med gy-blk, sft, CRS-f gr, sb ang-sb rnd, ply srt, r glauc, tr pyr. Gas Summary 0 0 0 (current) C-1 C-5i 0 C-3 00 C-4i C-4n 000 60 Average 00Background (max) Trip Chromatograph (ppm) 100% Gas In Air =10,000 Units 0Connection 0 0 Float 9-5/8" casing f/186' to 2181'. L/D jts #53 & #54. RIH to 6652'. Start rotating casing f/6652' to 8029' MD. . . 3038' 22 129 4 SKHI7 16D-E1OC 12.25 1.117 42.00 2717' 5755' Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1100.00 18-Oct-2013 12:00 AM Current Pump & Flow Data: 0 Max 0-0-WT-A-X-In-No-PR ROP ROP (ft/hr) 0.00 @ Mud Data Depth Morning Report Report # 17 Customer: Well: Area: Location: Rig: SP08-N7 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-In-No-TD Bit # 2 6.5 16" Hughes MX-1 9.20 Size 3 2676'MD 160'MD Tools API FL 28 3.2 160' 2692' WOB EVEMAR 0.00 Avg Min Comments RPM ECD (ppg) ml/30min Mud Type Lst 60 Type 159 12.0 Hycalog PDC LSND 5.2 2692' 8045'14 2717' Depth in / out YP (lb/100ft 2) 9.20 Cement Cht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900797980 $4,410.00 $59,780.00 Freeze Protect OA PV 2532' 12.25 1.117 Footage 4.10 25' 18.80 J. Kenner/O. Amend Sh Clyst Tuff Gvl Coal cP 10 (current) Avg to 0' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) 8044' 8044' 0' Max @ ft Current 0'0.0 Date: Time: in 0.0 SPP (psi) Gallons/stroke TFA Bit Type Depth 15.0 46 L-80 MBT 0' pH 1.117 Siltst 13 3/8" 0 Casing Summary Lithology (%) 40 Set At Size 178.9 X-65 Grade 8030'MD 20" 9 5/8" BTC Cly * 24 hr Recap: Cond hole at 2 to 6 bpm while SLB cementers work on pump. Cmt Job; 9-5/8" csg. Drop bottom plug.Test lines. 0 Freeze protect OA at 2 bpm & 1000 psi at report time. 100% Gas In Air =10,000 Units 0Connection 0 Chromatograph (ppm) 0Background (max) Trip Average 0 60 000 00 C-4i C-4n 0 C-3 C-1 C-5i Gas Summary 0 0 0 (current) Drop top plug, no losses noted. R/D cmt equip. N/D BOPE. Set 9-5/8" emergency slips. Install packoff & test. OK. N/U BOPE. 4 Latest Sample : 60% Sandstone : trnsl-trnsp-wh-lt-med gy-blk, sft, CRS-f gr, sb ang-sb rnd, ply srt, r glauc, tr pyr. 40% Siltstone : blk-brn, v f gr, hd, ang-sb rnd, mo srt. 0Minimum Depth C-5n C-2 87 0 0 0 Units* 0 40 1008 0 907-685-0772 Unit #110 Phone: 0 K. Plowman Maximum Report By: Logging Engineers: K. Plowman/ J. Tiegs (max) (current) 0 0 11041 . . 20" 9 5/8" Cly 160'MD 2676'MD 8030'MD EVEMAR BTC Depth in / out Bit Type RPM 8045' 160 129.0 ENI PETROLEUM SP08-N7 SPY ISLAND NORTH SLOPE DOYON15 AK-AM-0900797980 $3,410.00 $63,190.00 J. Kenner/O. Amend SKHI7 16D-E1OC SKHI7 16D-E1OC 178.9 68.0 X-65 L-80 Set At Size Grade 8044' 8044' 19-Oct-2013 13 3/8" in 0 Alkal Coal Gallons/stroke 0' Lime Tuff Gvl Yesterday's Depth: Current Depth: 24 Hour Progress: 0 SPP (psi) Max @ ft 0' Date: Time: API FL Depth 0' Avg to 0' Current 0.0 0.0 (current) Clyst Ss Cht Silt Casing Summary Lithology (%) 1.117 10 50 3038' 12.25 0.969 Footage Wireline: CBL PV cP Weight Flow In (gpm) Flow In (spm) Oil / Water Hours Cement Sh Siltst Lst (lb/100ft 2) 9.25 Type 18 Mud (lb/bbl) ml/30min 2290' 10 22.0 Comments Bit # 4 12.25 2717' 5 5755'11.00 42.00 Size 5755' WOB TFA Condition MWD Summary 96% %Mud Type FAZEPRO 5.6 Ratio Mud Data Depth 4.23 @ Current Pump & Flow Data: Report For: 8045' Cor Solids Avg Min YP Max ECD (ppg) Tools Job No.: Daily Charges: Total Charges: Rig Activity: 0.0 Morning Report Report # 18 Customer: Well: Area: Location: Rig: 12:00 AM 0 ROP ROP (ft/hr) 24 hr Max Density (ppg) out (sec/qt) Viscosity * 24 hr Recap: Report By: Logging Engineers: K. Plowman / J. Tiegs (max) (current) 907-685-0772 Unit # 110 Phone: 0 K. Plowman 0 C-2 Gas Summary 0 0 0 0 0 0 0 0 Minimum Depth Maximum 0 0 0 R/U wireline and function test. RIH w/tractor and CBL. Intermittent communication issues. POOH w/wireline and C/O CBL tool. 0 C-5n (current) Units* 0 C-1 C-5i Chromatograph (ppm) 0 0 00 C-4i C-4n 0 C-3 Average Trip (max) 0 Background RIH to 7950' and begin logging out of hole. 100% Gas In Air =10,000 Units Connection Service rig and top drive. P/U 60 jts 4.5" DP. Test BOPE's. Rig down test equipment. Pull test plug. Set wear ring. . . Cly 160'MD L-80 Bit Type RPM 20" 9 5/8" NORTH SLOPE DOYON15 AK-AM-0900797980 $3,410.00 $66,600.00 J. Kenner/O. Amend X-65 L-80 Casing Summary 4 12.25 5 160.0 2676'MD 8030'MD EVEMAR Set At Size Grade 8044' 8065' 20-Oct-2013 MDSi616 BPX 13 3/8" in SKHI7 16D-E1OC 489 Alkal Coal Gallons/stroke API FL Cement 21' Lime Tuff Gvl 24 Hour Progress: 117 SPP (psi) Max @ ft 8047' Date: Time: Depth 0' Avg to 0' Current 84.8 0.0 MWD Summary Bit # (current) Clyst Ss Cht Silt 2290' 8.75 0.902 Footage Size 40.0 178.9 68.0 BTC Depth in / out Flow In (gpm) Flow In (spm) Oil / Water Hours 5755' 8045' 11.00 13 46 Sh Siltst 9.20 Type 18 Lst Hydril 563 Lithology (%) Mud (lb/bbl) ml/30min 3.84 2.95 10.0 (lb/100ft 2)cP 8045' WOB TFA Condition 0-0-CT-A-X-I-NO-TD Comments Weight 0.969 96% %Mud Type FAZEPRO - Ratio Mud Data Depth 1.8 4.23 @ Current Pump & Flow Data: Report For: 8045'6.5 Cor Solids 10.12 Avg Min YP Max ECD (ppg) Tools PV Job No.: Daily Charges: Total Charges: Rig Activity: 253.3 ENI PETROLEUM SP08-N7 SPY ISLAND Morning Report Report # 19 Customer: Well: Area: Location: Rig: 12:00 AM FIT Yesterday's Depth: Current Depth: 2056 ROP ROP (ft/hr) 24 hr Max Density (ppg) out (sec/qt) Viscosity * 24 hr Recap: Report By: Logging Engineers: K. Plowman / J. Tiegs 907-685-0772 Unit # 110 Phone: 0 K. Plowman 0 C-2 Gas Summary 0 0 0 0 0 0 0 Minimum Depth Maximum 0 0 0 to 9.25 lb/gal FazePro mud. Clean surface equipment, cut and slip drill line. Drill shoe track, shoe, and 21' rat hole to 8065' MD. Latest Sample: No new samples 0 C-5n 0 (current) Units* Chromatograph (ppm) 00 C-4i C-4n 0 C-5i 0 0 0 C-1 Average 3 (max) 0 (max) (current) Background Trip C-3 =10,000 Units Connection POOH to 7899' MD to circulate for FIT. 100% Gas In Air Rig down wireline. Test 9 5/8" casing. Pick up BHA #6. Run in hole, wash down and tag plug at 7941'. Displace . . Set At Size 8.75 20" 9 5/8" NORTH SLOPE DOYON15 Casing Summary 4 12.25 AK-AM-0900797980 $3,410.00 $70,010.00 J. Kenner/O. Amend X-65 L-80 Grade Max @ ft 9242' 2290' 5 160.0 2676'MD 8030'MD EVEMAR 8065' 9568' 21-Oct-2013 MDSi616 BPX 1503' Lime Tuff Gvl Depth 0' 13 3/8" in SKHI7 16D-E1OC Bit # (current) 486 Alkal Coal Gallons/stroke API FL Cement L-80 24 Hour Progress: 0 SPP (psi) Date: Time: Mud to 0' Current 74.8 0.0 MWD Summary Clyst Ss Cht Silt Cly 0.902 Footage Size 40.0 178.9 68.0 BTC Depth in / out 160'MD Bit Type Flow In (gpm) Flow In (spm) Oil / Water Hours 5755' 8045' 11.00 12 43 Sh Siltst 9.20 Type 17 Lst 95 Hydril 563 5 Lithology (%) (lb/bbl) ml/30min 3.58 2.75 10.0 (lb/100ft 2)cP RPM 8045' WOB TFA Condition 0-0-CT-A-X-I-NO-TD Comments Weight 0.969 96% %Mud Type FAZEPRO - Ratio Mud Data Depth 67/33 4.23 @ Current Pump & Flow Data: Report For: 9163'7.2 Cor Solids 10.34 Avg Min YP Max ECD (ppg) Tools PV Job No.: Daily Charges: Total Charges: Rig Activity: 501.9 ENI PETROLEUM SP08-N7 SPY ISLAND Avg Morning Report Report # 20 Customer: Well: Area: Location: Rig: 12:00 AM Drill 8.75' Prod Yesterday's Depth: Current Depth: 2288 ROP ROP (ft/hr) 24 hr Max Density (ppg) out (sec/qt) Viscosity * 24 hr Recap: Report By: Logging Engineers: K. Plowman / J. Tiegs 907-685-0772 Unit # 110 Phone: 27 K. Plowman 13 C-2 Gas Summary 114 00Minimum 536 391554 0 82213 4108 Depth Maximum (current) 8825' 0 1187 67 0 8066' MD to 9476' MD / 4108' TVD at midnight. Monitor well. No losses noted while drilling. 1108 30% even dull yel-wh fluor, strmg dull yel-wh ct fluor, dull yel res fluor. Latest Sample: 95% Sandstone : trnsl-trnsp-wh-lt gy-brn-grn, f-vf gr, sb ang-sb rnd, w srt, abd glauc, tr mic, SHOW: no odor, tr lt brn stn, 0 Units* Chromatograph (ppm) C-5n 6416 C-4i C-4n 21 C-5i 39 735 2190 95 5 C-1 3 Average 3 (max) 0 (max) (current) 98 Background Trip C-3 =10,000 Units Connection 5% Siltstone 100% Gas In Air Cond hole. R/U to perform FIT. R/D equip. Drill 8.75" production hole w/tapered drill string 5" & 4.5" DP from . . Size 8.75 20" 9 5/8" NORTH SLOPE DOYON15 Casing Summary 4 12.25 AK-AM-0900797980 $3,410.00 $73,420.00 J. Kenner/O. Amend X-65 L-80 Grade Max @ ft 10411' 2290' 5 160.0 2676'MD 13 3/8" in 8030'MD EVEMAR 9569' 11302' 22-Oct-2013 1733' Lime Tuff Gvl Depth 0' Bit # (current) 502 Alkal Coal Gallons/stroke API FL Cement L-80 2.60 24 Hour Progress: 120 SPP (psi) Date: Time: Mud (lb/bbl) ml/30min 3.38 to 0' Current 78.2 10.0 MWD Summary Avg Clyst Ss Cht Silt Cly 178.9 68.0 BTC Depth in / out 160'MD Bit Type SKHI7 16D-E1OC MDSi616 BPX Set At 11.00 13 42 0.902 Footage Size Flow In (gpm) Flow In (spm) Oil / Water Hours 5755' 8045' Lithology (%) 9.20 Type 14 Sh Siltst Lst 95 Hydril 563 5 40.0 10.0 (lb/100ft 2)cP RPM 8045' WOB TFA Condition 0-0-CT-A-X-I-NO-TD Comments Weight 0.969 96% %Mud Type FAZEPRO - Ratio Mud Data Depth 69/31 4.23 @ Current Pump & Flow Data: Report For: 10986'7.7 Cor Solids 10.56 Avg Min YP Max ECD (ppg) Tools PV Job No.: Daily Charges: Total Charges: Rig Activity: 538.7 ENI PETROLEUM SP08-N7 SPY ISLAND Morning Report Report # 21 Customer: Well: Area: Location: Rig: 12:00 AM Drill 8.75' Prod Yesterday's Depth: Current Depth: 2261 ROP ROP (ft/hr) 24 hr Max Density (ppg) out (sec/qt) Viscosity * 24 hr Recap: Report By: Logging Engineers: K. Plowman / J. Tiegs 907-685-0772 Unit # 110 Phone: 42 K. Plowman 46 C-2 Gas Summary 141 00Minimum Depth Maximum 93 10018' 887 445593 0 (current) 10889' 0 1536 5727 0 ECD's=10.59-10.37ppg. Max Gas=5727 units. Due to high gas unit increased mud weight F/9.15ppg T/9.3ppg by 0.5ppg increment 1753 lt brn stn, 10% even brt yel-wh fluor, brt yel-wh ct fluor, amb ct. Latest Sample: 95% Sandstone : trnsl-trnsp-wh-lt gy-brn-crm, m-vf gr, sb ang-sb rnd, mod srt, abd glauc, tr mic, tr pyr, SHOW: no odor, 0 C-5n 21 803 C-4i C-4n 54 C-5i 67 777 2512 6 Chromatograph (ppm) 95 5 C-1 Units* Average (max) 244 (max) 121 134276 Trip (current) Background C-3 =10,000 Units Connection 5% Siltstone regarding gas units. No loss for today. 100% Gas In Air Drilling F/9569' T/11302' @ midnight. Con't drilling F/10223' T/11250' @ GPM=550-500 PSI=2300 . . Density (ppg) out (sec/qt) Viscosity 2967 ROP ROP (ft/hr) 24 hr Max Morning Report Report # 22 Customer: Well: Area: Location: Rig: 12:00 AM Drill 8.75' Prod Yesterday's Depth: Current Depth: Job No.: Daily Charges: Total Charges: Rig Activity: 493.0 ENI PETROLEUM SP08-N7 SPY ISLAND YP Max ECD (ppg) Tools PV Cor Solids 11.25 Avg Min Depth 70/30 4.23 @ Current Pump & Flow Data: Report For: 13542'8.2 Comments Weight 0.969 96% %Mud Type FAZEPRO - Ratio Mud Data 8045' WOB TFA Condition 0-0-CT-A-X-I-NO-TD 10.0 (lb/100ft 2)cP RPM Lst 90 Hydril 563 10 40.0 Lithology (%) 9.30 Type 17 Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 5755' 8045' 11.00 15 45 0.902 Footage Size 178.9 68.0 BTC Depth in / out 160'MD Bit Type SKHI7 16D-E1OC MDSi616 BPX Set At Avg Clyst Ss Cht Silt Cly (lb/bbl) ml/30min 2.99 to 0' Current 119.0 0.0 MWD Summary 2.30 24 Hour Progress: 105 SPP (psi) Date: Time: 535 Alkal Coal Gallons/stroke API FL L-80 Mud (current) Depth 0' Bit # 11302' 13958' 23-Oct-2013 2656' Lime Tuff Gvl Cement L-80 Grade Max @ ft 11907' 2290' 5 160.0 2676'MD 13 3/8" in NORTH SLOPE DOYON15 Casing Summary 4 12.25 AK-AM-0900797980 $3,410.00 $76,830.00 M. Ross/O. Amend X-65 Size 8.75 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Continue to drill ahead in production section from 11302' MD to 13958' MD. The max gas observed was 4200 units 100% Gas In Air =10,000 Units Connection Trip (current) Background 289 (max) 137 90326 Average (max) 90 10 C-1 Units* 10 Chromatograph (ppm) 631 2125 C-3 C-4i C-4n 74 C-5i 90 C-5n Latest Sample: SST: trnsl-trnsp-wh-lt gy-brn-crm, f-vf gr, sb ang-sb rnd, w srt, abd glauc, r sh frag, sli slty, SHOW: no odor, lt brn stn, 0 33 1118 0 @ 11271' MD 961 50% even brt yel-wh fluor, dull yel ct fluor, lt amb ct. (current) 11271' 0 1540 4200 1137 392632 0 Gas Summary 134 00Minimum Depth Maximum 907-685-0772 Unit # 110 Phone: 42 K. Plowman 36 94 12955' Report By: Logging Engineers: K. Plowman / J. Tiegs C-2 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 4 12.25 AK-AM-0900797980 $3,410.00 $80,240.00 M. Ross/O. Amend X-65 15083' 2290' 5 160.0 2676'MD 13 3/8" in Size 8.75 Cement Bit # 13958' 15728' 24-Oct-2013 1770' Lime Tuff Gvl (current) 486 Alkal Coal Gallons/stroke API FL L-80 Mud 2.30 24 Hour Progress: 111 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.99 to 0' 0' L-80 Grade Set At Avg Clyst Ss Cht Silt 35 Size 178.9 68.0 BTC Depth in / out 160'MD Bit Type SKHI7 16D-E1OC MDSi616 BPX 8045' 11.00 14 46 0.902 Footage Flow In (gpm) Flow In (spm) Oil / Water Hours 5755' Lithology (%) 9.30 Type 20 Sh Siltst Lst 65 Hydril 563 40.0 10.0 (lb/100ft 2)cP RPM 8045' WOB TFA Condition 0-0-CT-A-X-I-NO-TD Comments Weight 0.969 96% %Mud Type FAZEPRO - Ratio Mud Data Current Pump & Flow Data: Report For: 15523'8.2 Current 78.8 0.0 Avg Min Depth 70/30 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools PV Cor Solids 11.40 Job No.: Daily Charges: Total Charges: Rig Activity: 514.0 ENI PETROLEUM SP08-N7 SPY ISLAND Max @ ft Morning Report Report # 23 Customer: Well: Area: Location: Rig: 12:00 AM Drill 8.75' Prod Yesterday's Depth: Current Depth: 2943 ROP ROP (ft/hr) 24 hr Max Density (ppg) out (sec/qt) Viscosity * 24 hr Recap: Report By: Logging Engineers: K. Plowman / J. Tiegs C-2 Maximum 907-685-0772 Unit # 110 Phone: 60 K. Plowman 121 140 15542' Gas Summary 207 00Minimum Depth 1764 429075 0 (current) 14820' 0 2401 5300 0 max gas observed was 5300 units @ 14820' MD. 1682 lt brn stn, 40% brt wh-yel fluor, dull yel ct fluor, lt amb ct. Latest Sample: SST: trnsl-trnsp-wh-gy-brn-grn-crm, m-vf gr, sb ang-sb rnd, mod srt, tr mic, tr pyr, r shl frag, v slty, SHOW: no odor, 0 53 1622 35 C-5n C-4i C-4n 105 C-5i 134 979 3501 C-3 13 Chromatograph (ppm) 65 C-1 Units* Average (max) 502 (max) 47 190380 Trip (current) Background =10,000 Units Connection 100% Gas In Air Continued to drill production hole from 13958' MD to 15728' MD. Serviced top drive, block, and Drawworks. The . . * 24 hr Recap:Continue to drill production hole from 15728' MD to TD of 15870' MD. Begin to BROOH per K&M rep. Max gas 2026 ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig:12:00 AM BROOH Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7 SPY ISLAND Max @ ft Morning Report Report # 24 Customer: Well: Area: Location: Current Pump & Flow Data: PV 11.27 11.70 Cor Solids 11.56 Job No.: Daily Charges: Total Charges: Rig Activity: 305.7 4.23 @ MWD Summary Depth YP MaxECD (ppg)Tools Xceed 675, Periscope 675, TeleScope 675, adnVision 675 Report For: 15870'8.4 Current 207.0 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft2)cP 70/309.30 Avg Min Depth 100% Gas In Air 9.30 8045' WOBTFA Condition 0-0-CT-A-X-I-NO-TD Comments (current) Background (max) 55 98415 Trip 96 (max) 280 =10,000 Units-Connection 10.0 40.0 Type 68 RPM Average Weight 0.969 Hydril 563 C-1 Lithology (%) 46 15828' 16 ShSiltst C-5i 551 1944 C-5n Flow In (gpm) Flow In (spm) Oil / Water Hours 5755' C-4i C-4nC-3 1344 0.902 Footage 15870' Chromatograph (ppm) Lst 160'MD Bit Type SKHI7 16D-E1OC MDSi616 BPX 8045' 11.00 Avg ClystSsChtSilt 20 Size to15728' 15870' L-80 GradeSet At 178.9 68.0BTC 119 SPP (psi) Date: Time: Cly (lb/bbl)ml/30min 2.54 Depth in / out API FL L-80 Mud 1.95 293 30852 498 Alkal Coal Gallons/stroke 61 observed was 1640 units @ 15828' MD. Samples have consisted of 80% sst & 20% sltst. 828 34 1396 1716 (current) 1640 80 Units* 15728' 15870' 25-Oct-2013 142' Lime TuffGvl 24 Hour Progress: Cement Gas Summary 119 19137Minimum Depth 907-685-0772Unit # 110 Phone: 42 Leigh Ann Rasher 3261 88 15806' 935 15844' 2290' 5 160.0 2676'MD13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 4 12.25 AK-AM-0900797980 $4,410.00 $84,650.00 M. Ross/O. Amend X-65 Report By: 20" 9 5/8" Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman 8030'MD EVEMAR C-2 Maximum 185201 . . * 24 hr Recap: Report By: 20" 9 5/8" Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman 8030'MD EVEMAR C-2 Maximum 0 NORTH SLOPE DOYON15 Casing Summary 4 12.25 AK-AM-0900797980 $3,410.00 $88,060.00 M. Ross/O. Amend X-65 2290' 5 160.0 2676'MD13 3/8" in Size 8.75 Bit # 907-685-0772Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Cement Gas Summary 0 00Minimum Depth 15870' 15870' 26-Oct-2013 0' Lime TuffGvl 24 Hour Progress: (current) Units* 0 0 00 0 0 00 Alkal Coal Gallons/stroke API FL 0-1-CT-Sh-X-In-No-TD L-80 Mud 2.20 10 SPP (psi) Date: Time: Cly (lb/bbl)ml/30min 2.86 Depth in / out to15870' 15870' L-80 GradeSet At 7825' 178.9 68.0BTC Avg ClystSsChtSilt Size 160'MD Bit Type SKHI7 16D-E1OC MDSi616 BPX 8045'60.30 11.00 1342 0.902 Footage 15870' Chromatograph (ppm) Lst C-5n Flow In (gpm) Flow In (spm) Oil / Water Hours 5755' C-4i C-4nC-3 16 ShSiltst C-5i 0 0 Lithology (%) RPM 160 Average Weight 0.969 Hydril 563 C-1 0 =10,000 Units-Connection 10.0 40.0 Type 0 Trip 12 (max) 0 (current) Background (max) Condition 0-0-CT-A-X-I-NO-TD Comments Avg Min Depth 100% Gas In Air 9.35 8045' WOBTFA %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft2)cP 70/309.35 Report For: 15870'8.5 Current 96%4.23 @ MWD Summary Depth YP MaxECD (ppg)Tools PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: ENI PETROLEUM SP08-N7 SPY ISLAND Max @ ft Morning Report Report # 25 Customer: Well: Area: Location: Current Pump & Flow Data: Rig:12:00 AM RIH w/ 5.5" liner Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ROP ROP (ft/hr) 24 hr Max Density (ppg) Cont. BROOH per K&M rep. Circ B/U & monitor well. Cont POOH. L/D BHA #6. R/U to RIH w/ 5.5" liner. . . * 24 hr Recap:Cont RIH w/ 5.5" liner. M/U liner hanger assy. Cont RIH w/ 5" DP. Set liner & POOH. Test BOPs. ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig:12:00 AM Test BOPs Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7 SPY ISLAND Max @ ft Morning Report Report # 26 Customer: Well: Area: Location: Current Pump & Flow Data: PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: 4.23 @ MWD Summary Depth YP MaxECD (ppg)Tools Report For: 15870'9.0 Current 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft2)cP 70/309.40 Avg Min Depth 100% Gas In Air 9.40 8045' WOBTFA Condition 0-0-CT-A-X-I-NO-TD Comments (current) Background (max) 0 Trip (max) 0 =10,000 Units-Connection 10.0 40.0 Type 0 RPM 160 Average Weight 0.969 Hydril 563 C-1 Lithology (%)ShSiltst C-5i 0 0 C-5n Flow In (gpm) Flow In (spm) Oil / Water Hours 5755' C-4i C-4nC-3 151443 0.902 Footage 15870' Chromatograph (ppm) Lst 160'MD Bit Type SKHI7 16D-E1OC MDSi616 BPX 8045'60.30 11.00 Avg ClystSsChtSilt Size to15870' 15870' L-80 GradeSet At 7825' 178.9 68.0BTC SPP (psi) Date: Time: Cly (lb/bbl)ml/30min 2.60 Depth in / out API FL 0-1-CT-Sh-X-In-No-TD L-80 Mud 2.00 10 0 00 Alkal Coal Gallons/stroke 0 0 0 00 (current) Units* 15870' 15870' 27-Oct-2013 0' Lime TuffGvl 24 Hour Progress: Cement Gas Summary 0 00Minimum Depth 907-685-0772Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 2290' 5 160.0 2676'MD13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 4 12.25 AK-AM-0900797980 $3,410.00 $91,470.00 M. Ross/O. Amend X-65 Report By: 20" 9 5/8" Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman 8030'MD EVEMAR C-2 Maximum 0 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 6RR 8.75 AK-AM-0900797980 $3,410.00 $94,880.00 M. Ross/O. Amend X-65 2676'MD 13 3/8" in Size Bit # Cement 7791' 7821' 28-Oct-2013 30' Lime Tuff Gvl 24 Hour Progress: (current) 444 Alkal Coal Gallons/stroke API FL L-80 Mud 2.20 106 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.86 Depth in / out to 7791' 7821' L-80 Grade Set At 178.9 68.0 BTC Avg Clyst Ss Cht Silt Size 160'MD Bit Type Smith XR+ Milltooth 14 45 Footage Lst Flow In (gpm) Flow In (spm) Oil / Water Hours 15870' 16 Siltst Lithology (%) Sh RPM Weight 0.902 Hydril 563 40.0 Type Condition Comments Avg Min Depth 9.30 WOB TFA %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 2.2 9.30 Report For: 7808'7.7 Current 3.8 96% 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools SP Motor 1.50, TeleScope 675 PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: ENI PETROLEUM SP08-N7 L1 SPY ISLAND Max @ ft Morning Report Report # 27 Customer: Well: Area: Location: Current Pump & Flow Data: Rig: 12:00 AM Milling window Yesterday's Depth: Current Depth: out (sec/qt) Viscosity 1073 ROP ROP (ft/hr) 24 hr Max Density (ppg) * 24 hr Recap: Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 0 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Gas Summary 0 00Minimum Depth (current) Units* 00 Max Gas = 19 u Avg Gas = 10 u 0 0 00 Chromatograph (ppm) C-5n C-4i C-4n C-3 C-5i 0 0 0 0 Average C-1 0 =10,000 Units -Connection 0 Trip 19 (max) 0 (current) Background (max) Spot sample collected @ 7801' MD consisted of 100% sst. 100% Gas In Air Cont test BOPs. M/U & P/U whipstock BHA. RIH & begin milling window at 7791' MD. . . ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM RIH Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7 L1 SPY ISLAND Max @ ft Morning Report Report # 28 Customer: Well: Area: Location: Current Pump & Flow Data: PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools SP Motor 1.50, TeleScope 675 Report For: 7838'8.1 Current 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 69/31 9.30 Avg Min Depth WOB TFA Condition Comments 40.0 Type RPM Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 7838' 16 14 46 Footage Lst 160'MD Bit Type Smith XR+ Milltooth Avg Clyst Ss Cht Silt Size to 7821' 7838' L-80 Grade Set At 178.9 68.0 BTC SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.86 Depth in / out API FL L-80 Mud 2.20 Alkal Coal Gallons/stroke (current) 7821' 7838' 29-Oct-2013 17' Lime Tuff Gvl 24 Hour Progress: Cement 2676'MD 13 3/8" in Size Bit # NORTH SLOPE DOYON15 Casing Summary 6RR 8.75 AK-AM-0900797980 $3,410.00 $98,290.00 M. Ross/O. Amend X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Cont milling window. TOW @ 7791' MD, BOW @ 7808' MD. Mill to 7838' MD. Drop ball & pump sweep. POOH. L/D 100% Gas In Air (current) Background (max) 0 Trip 19 (max) 0 =10,000 Units -Connection 0Average C-1 C-5i 0 0 0 0 C-5n C-4i C-4n C-3 Chromatograph (ppm) 0 00 Max Gas = 19 u Avg Gas = 14 u 0 milling BHA & P/U BHA #8. RIH. 00 (current) Units* Gas Summary 0 00Minimum Depth 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 0 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 6RR 8.75 AK-AM-0900797980 $3,410.00 $101,700.00 M. Ross/O. Amend X-65 7917' 200' 7 40.0 2676'MD 13 3/8" in Size 8.75 Bit # Cement 7838' 8038' 30-Oct-2013 200' Lime Tuff Gvl 24 Hour Progress: (current) 50 Alkal Coal Gallons/stroke API FL L-80 Mud 2.20 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.86 Depth in / out to 7838' 8038' L-80 Grade Set At 178.9 68.0 BTC Avg Clyst Ss Cht Silt 50 Size 160'MD Bit Type Smith XR+ Milltooth Smith MDSi616 BPX PDC 8038' 3.30 14 46 0.902 Footage Lst Flow In (gpm) Flow In (spm) Oil / Water Hours 7838' 18 Siltst Lithology (%) Sh RPM Weight 0.902 Hydril 563 12.0 40.0 Type Condition 0-0-WT-A-E-In-No-BHA Comments Avg Min Depth 9.30 8038' WOB TFA %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 70/30 9.30 Report For: 8038'8.2 Current 70.4 96% 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 PV 10.12 10.12 Cor Solids 10.12 Job No.: Daily Charges: Total Charges: Rig Activity: 162.8 ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 29 Customer: Well: Area: Location: Current Pump & Flow Data: Rig: 12:00 AM RIH w/ BHA 9 Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ROP ROP (ft/hr) 24 hr Max Density (ppg) * 24 hr Recap: Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 3024 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 1272 0 7846' 0 Gas Summary 0 00Minimum Depth (current) 32 50 Units* 00 BHA #8 & P/U BHA #9. Rig maintainence. Begin to RIH. Samples have consisted of 40%-60% sst & 40%-60% sltst. 21 Max Gas = 32 u Avg Gas = 13 u 0 0 00 50 Chromatograph (ppm) C-5n C-4i C-4n C-3 C-5i 0 0 0 0 13 7859' Average C-1 0 =10,000 Units -Connection 0 Trip 8 (max) 1920 (current) Background (max) 13 100% Gas In Air Cont RIH. Perform LOT @ 7791' MD to 11.61 ppg EMW. Drill ahead f/ 7838' MD to 8038' MD. CBU & POOH. L/D . . 2122 ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM Drill 8.75" L1 Section Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 30 Customer: Well: Area: Location: Current Pump & Flow Data: PV 9.85 10.53 Cor Solids 10.31 Job No.: Daily Charges: Total Charges: Rig Activity: 331.8 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 Report For: 9017'8.4 Current 177.7 253.9 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 71/29 9.30 Avg Min Depth 9.30 8038' WOB TFA Condition 0-0-WT-A-E-In-No-BHA Comments 12.0 40.0 Type RPM Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 7838' 13 14 45 0.902 Footage Lst 160'MD Bit Type Smith XR+ Milltooth Smith MDSi616 BPX PDC 8038' 3.30 Avg Clyst Ss Cht Silt Size to 8038' 9363' L-80 Grade Set At 178.9 68.0 BTC 116 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.86 Depth in / out API FL L-80 Mud 2.20 518 Alkal Coal Gallons/stroke (current) 100 8038' 9363' 31-Oct-2013 1325' Lime Tuff Gvl 24 Hour Progress: Cement 9323' 200' 7 40.0 2676'MD 13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 6RR 8.75 AK-AM-0900797980 $3,410.00 $105,110.00 M. Ross/O. Amend X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Cont RIH w/ BHA#9. Drill ahead f/ 8038' MD to 9363' MD. Samples have consisted of mostly slst w/ some sst f/ 8038' 100% Gas In Air (current) Background (max) 66 70819 Trip - (max) 156 =10,000 Units -Connection 46 Average C-1 13 8652' C-5i 482 1257 0 739 C-5n C-4i C-4n C-3 Chromatograph (ppm) 0 0506 Max Gas = 2555 u Avg Gas = 811 u 30 MD to 8500' MD. Abundant sst f/ 8500' MD to 9363' MD w/ high gas intervals. 811 00 (current) 2555 100 Units* Gas Summary 72 00Minimum Depth 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 1041 33 8038' 541 Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 282236 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 7 8.75 AK-AM-0900797980 $3,410.00 $108,520.00 M. Ross/O. Amend X-65 9508' 1626' 7RR 120.0 2676'MD 13 3/8" in Size 8.75 Bit # Cement 9363' 9664' 1-Nov-2013 301' Lime Tuff Gvl 24 Hour Progress: (current) 100 Alkal Coal Gallons/stroke API FL L-80 Mud 2.00 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.60 Depth in / out to 9363' 9664' L-80 Grade Set At 178.9 68.0 BTC Avg Clyst Ss Cht Silt Size 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 9664' 13.30 13 43 0.902 Footage Lst Flow In (gpm) Flow In (spm) Oil / Water Hours 8038' 16 Siltst Lithology (%) Sh RPM Weight 0.902 Hydril 563 10.0 40.0 Type Condition 0-6-BT-G-X-1-CT-DTF Comments Avg Min Depth 9664' WOB TFA %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 72/28 9.30 Report For: 9664'9.0 Current 199.5 96% 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 PV 10.15 10.50 Cor Solids 10.31 Job No.: Daily Charges: Total Charges: Rig Activity: 317.2 ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 31 Customer: Well: Area: Location: Current Pump & Flow Data: Rig: 12:00 AM RIH BHA #10 Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ROP ROP (ft/hr) 24 hr Max Density (ppg) * 24 hr Recap: Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 306377 907-685-0772 Unit # 110 Phone: 42 Leigh Ann Rasher 19181 98 9560' 42 Gas Summary 153 55 50 Minimum Depth (current) 2815 100 Units* 25 66 Samples have consisted of 100% sst. 1114 Max Gas = 2815 u Avg Gas = 1114 u 40 72 16 56 Chromatograph (ppm) C-5n C-4i C-4n C-3 C-5i 561 216 54 173 112 9304' Average C-1 65 =10,000 Units -Connection 45 Trip 79 (max) 12367 (current) Background (max) 78 100% Gas In Air Cont drill ahead f/ 9363' MD to 9664' MD. Begin to POOH due to tool failure. L/D BHA #9. P/U BHA #10 & RIH. . . 2677 ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM Drill 8.75" L1 Section Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 32 Customer: Well: Area: Location: Current Pump & Flow Data: PV 10.34 10.91 Cor Solids 10.64 Job No.: Daily Charges: Total Charges: Rig Activity: 364.5 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 Report For: 10313'8.5 Current 217.3 68.1 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 71/29 9.25 Avg Min Depth 9664' WOB TFA Condition 0-6-BT-G-X-1-CT-DTF Comments 10.0 40.0 Type RPM Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 8038' 17 14 45 0.902 Footage Lst 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 9664' 13.30 Avg Clyst Ss Cht Silt 50 Size to 9664' 10454' L-80 Grade Set At 178.9 68.0 BTC 141 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.86 Depth in / out API FL L-80 Mud 2.20 596 Alkal Coal Gallons/stroke (current) 50 9664' 10454' 2-Nov-2013 790' Lime Tuff Gvl 24 Hour Progress: Cement 9687' 1626' 7RR 120.0 2676'MD 13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 7 8.75 AK-AM-0900797980 $3,410.00 $111,930.00 M. Ross/O. Amend X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Cont RIH w BHA #10. Drill ahead f/ 9664' MD - 10454' MD. Samples have consisted mainly of 100% sst w/ 30%-50% 100% Gas In Air (current) Background (max) 44 95720 Trip - (max) 238 =10,000 Units -Connection 74 Average C-1 24 9304' C-5i 481 187 0 130 C-5n C-4i C-4n C-3 Chromatograph (ppm) 50 5 25 91 Max Gas = 2176 u Avg Gas = 941 u 54 sltst f/ 10150' MD - 10350' MD. 941 00 (current) 2176 50 Units* Gas Summary 113 00Minimum Depth 907-685-0772 Unit # 110 Phone: 29 Leigh Ann Rasher 2214 66 9560' 93 Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 242165 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 7 8.75 AK-AM-0900797980 $3,410.00 $115,340.00 M. Ross/O. Amend X-65 10507' 1626' 7RR 120.0 2676'MD 13 3/8" in Size 8.75 Bit # Cement 10454' 10548' 3-Nov-2013 94' Lime Tuff Gvl 24 Hour Progress: (current) 70 Alkal Coal Gallons/stroke API FL L-80 Mud 2.20 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.86 Depth in / out to 10454' 10548' L-80 Grade Set At 178.9 68.0 BTC Avg Clyst Ss Cht Silt 30 Size 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 9664' 13.30 14 45 0.902 Footage Lst Flow In (gpm) Flow In (spm) Oil / Water Hours 8038' 17 Siltst Lithology (%) Sh RPM Weight 0.902 Hydril 563 10.0 40.0 Type Condition 0-6-BT-G-X-1-CT-DTF Comments Avg Min Depth 9664' WOB TFA %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 71/29 9.25 Report For: 10313'8.5 Current 104.7 96% 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 PV 10.65 10.77 Cor Solids 10.71 Job No.: Daily Charges: Total Charges: Rig Activity: 204.9 ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 33 Customer: Well: Area: Location: Current Pump & Flow Data: Rig: 12:00 AM L/D BHA #10 Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ROP ROP (ft/hr) 24 hr Max Density (ppg) * 24 hr Recap: Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 66154 907-685-0772 Unit # 110 Phone: 1 Leigh Ann Rasher 969 34 10548' 35 Gas Summary 36 00Minimum Depth (current) 540 70 Units* 00 w/ 30%-50% sltst. 312 Max Gas = 540 u Avg Gas = 312 u 33 3 16 45 30 Chromatograph (ppm) C-5n C-4i C-4n C-3 C-5i 126 41 0 46 10 10521' Average C-1 74 =10,000 Units -Connection 34 Trip 127 (max) 30953 (current) Background (max) 44 100% Gas In Air Drill ahead f/ 10454' MD - 10548' MD. POOH due to tool failure. Samples have consisted mainly of 50-70% sst . . 2322 ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM Drill 8.75" L1 Section Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 34 Customer: Well: Area: Location: Current Pump & Flow Data: PV 10.15 10.62 Cor Solids 10.39 Job No.: Daily Charges: Total Charges: Rig Activity: 341.7 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 Report For: 10548'8.6 Current 238.4 276.4 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 71/29 9.25 Avg Min Depth 10548' WOB TFA Condition 0-0-CT-N-X-IN-WT-DTF Comments 10.0 40.0 Type RPM Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 16 115 45 0.902 Footage Lst 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 8.00 Avg Clyst Ss Cht Silt 20 Size to 10548' 10696' L-80 Grade Set At 178.9 68.0 BTC 112 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.86 Depth in / out API FL L-80 Mud 2.20 495 Alkal Coal Gallons/stroke (current) 80 10548' 10696' 4-Nov-2013 148' Lime Tuff Gvl 24 Hour Progress: Cement 10602' 884' 7RR 150.0 2676'MD 13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 7RR 8.75 AK-AM-0900797980 $3,410.00 $118,750.00 M. Ross/O. Amend X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Cont. POOH. L/D BHA #10 & P/U BHA #11. RIH & Shallow hole test tools, fail. POOH & P/U BHA #12 & RIH. Drill 100% Gas In Air (current) Background (max) 34 85168 Trip - (max) 153 =10,000 Units -Connection 21 Average C-1 14 10691' C-5i 352 87 0 47 C-5n C-4i C-4n C-3 Chromatograph (ppm) 20 0 022 Max Gas = 2092 u Avg Gas = 777 u 2 ahead f/ 10548' MD - 10696' MD. Samples have consisted of 80% sst & 20% sltst. 777 00 (current) 2092 80 Units* Gas Summary 46 00Minimum Depth 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 2465 22 10551' 35 Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 238679 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 7RR 8.75 AK-AM-0900797980 $3,410.00 $122,160.00 M. Ross/O. Amend X-65 10785' 884' 8 150.0 2676'MD 13 3/8" in Size 8.75 Bit # Cement 10696' 12837' 5-Nov-2013 2141' Lime Tuff Gvl 24 Hour Progress: (current) 100 553 Alkal Coal Gallons/stroke API FL L-80 Mud 2.20 130 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.86 Depth in / out to 10696' 12837' L-80 Grade Set At 178.9 68.0 BTC Avg Clyst Ss Cht Silt 0 Size 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 8.00 115 45 0.902 Footage Lst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 16 Siltst Lithology (%) Sh RPM Weight 0.902 Hydril 563 10.0 40.0 Type Condition 0-0-CT-N-X-IN-WT-DTF Comments Avg Min Depth 10548' WOB TFA %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 71/29 9.25 Report For: 10548'8.6 Current 240.2 353.4 96% 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 PV 10.81 11.17 Cor Solids 10.15 Job No.: Daily Charges: Total Charges: Rig Activity: 456.7 ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 35 Customer: Well: Area: Location: Current Pump & Flow Data: Rig: 12:00 AM Drill 8.75" L1 Section Yesterday's Depth: Current Depth: out (sec/qt) Viscosity 2949 ROP ROP (ft/hr) 24 hr Max Density (ppg) * 24 hr Recap: Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 363780 907-685-0772 Unit # 110 Phone: 23 Leigh Ann Rasher 1608 61 11407' 176 Gas Summary 108 02Minimum Depth (current) 3636 100 Units* 00 11100' MD. 1093 Max Gas = 3636 u Avg Gas = 1093 u 93 0 42 161 0 Chromatograph (ppm) C-5n C-4i C-4n C-3 C-5i 547 187 0 119 18 11500' Average C-1 454 =10,000 Units -Connection 134 Trip - (max) 103382 (current) Background (max) 62 100% Gas In Air Cont drill ahead f/ 10696' MD to 12837' MD. Samples have consisted of mainly sst w/ abundant sltst f/ 10950' MD to . . 3037 ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM Drill 8.75" L1 Section Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 36 Customer: Well: Area: Location: Current Pump & Flow Data: PV 10.76 11.47 Cor Solids 11.14 Job No.: Daily Charges: Total Charges: Rig Activity: 708.9 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 Report For: 14649'8.8 Current 264.7 154.1 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 71/29 9.30 Avg Min Depth 10548' WOB TFA Condition 0-0-CT-N-X-IN-WT-DTF Comments 10.0 40.0 Type RPM Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 19 14 47 0.902 Footage Lst 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 8.00 Avg Clyst Ss Cht Silt 0 Size to 12837' 14955' L-80 Grade Set At 178.9 68.0 BTC 128 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.47 Depth in / out API FL L-80 Mud 1.90 541 Alkal Coal Gallons/stroke (current) 100 12837' 14955' 6-Nov-2013 2118' Lime Tuff Gvl 24 Hour Progress: Cement 13026' 884' 8 150.0 2676'MD 13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 7RR 8.75 AK-AM-0900797980 $3,410.00 $125,570.00 J. Keener/O. Amend X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Cont drill ahead f/ 12837' MD to 14955' MD. Samples have consisted of mainly sst. 100% Gas In Air (current) Background (max) 121 72802 Trip - (max) 213 =10,000 Units -Connection 75 Average C-1 12 14558' C-5i 776 280 0 216 C-5n C-4i C-4n C-3 Chromatograph (ppm) 0 0 33 94 Max Gas = 3186 u Avg Gas = 781 u 68 781 00 (current) 3186 100 Units* Gas Summary 184 00Minimum Depth 907-685-0772 Unit # 110 Phone: 65 Leigh Ann Rasher 115 131 14096' 87 Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 330097 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 7RR 8.75 AK-AM-0900797980 $3,410.00 $128,980.00 J. Keener/O. Amend X-65 15078' 884' 8 150.0 2676'MD 13 3/8" in Size 8.75 Bit # Cement 14955' 15977' 7-Nov-2013 1022' Lime Tuff Gvl 24 Hour Progress: (current) 90 448 Alkal Coal Gallons/stroke API FL L-80 Mud 2.25 106 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.93 Depth in / out to 14955' 15977' L-80 Grade Set At 178.9 68.0 BTC Avg Clyst Ss Cht Silt 10 Size 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 8.00 15 48 0.902 Footage Lst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 19 Siltst Lithology (%) Sh RPM Weight 0.902 Hydril 563 10.0 40.0 Type Condition 0-0-CT-N-X-IN-WT-DTF Comments Avg Min Depth 10548' WOB TFA %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 71/29 9.25 Report For: 15977'8.5 Current 248.8 96% 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 PV 10.71 11.48 Cor Solids 11.20 Job No.: Daily Charges: Total Charges: Rig Activity: 405.9 ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 37 Customer: Well: Area: Location: Current Pump & Flow Data: Rig: 12:00 AM BROOH Yesterday's Depth: Current Depth: out (sec/qt) Viscosity 2128 ROP ROP (ft/hr) 24 hr Max Density (ppg) * 24 hr Recap: Report By: Logging Engineers: Leigh Ann Rasher / Kori Jo Plowman C-2 Maximum 219252 907-685-0772 Unit # 110 Phone: 57 Leigh Ann Rasher 1097 114 15900' 110 Gas Summary 154 43Minimum Depth (current) 2018 90 Units* 07 sst. 667 Max Gas = 2018 u Avg Gas = 667 u 77 3 36 110 10 Chromatograph (ppm) C-5n C-4i C-4n C-3 C-5i 645 233 0 187 10 15891' Average C-1 251 =10,000 Units -Connection 86 Trip 312 (max) 66035 (current) Background (max) 125 100% Gas In Air Cont drill ahead f/ 14955' MD to TD of 15977' MD. Began to BROOH per K&M rep. Samples have consisted of mainly . . ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM L/D BHA Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 38 Customer: Well: Area: Location: Current Pump & Flow Data: PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Xceed 675, PeriScope 675, TeleScope 675, adnVision 675 Report For: 15977'8.5 Current 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 71/29 9.30 Avg Min Depth 10548' WOB TFA Condition 0-0-CT-N-X-IN-WT-DTF Comments 10.0 40.0 Type RPM Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 19 15 48 0.902 Footage Lst 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 8.00 Avg Clyst Ss Cht Silt Size to 15977' 15977' L-80 Grade Set At 178.9 68.0 BTC SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.93 Depth in / out API FL L-80 Mud 2.25 Alkal Coal Gallons/stroke (current) 15977' 15977' 8-Nov-2013 0' Lime Tuff Gvl 24 Hour Progress: Cement 884' 8 150.0 2676'MD 13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 7RR 8.75 AK-AM-0900797980 $4,568.10 $133,548.10 J. Keener/O. Amend X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Cont to BROOH to window. POOH. Begin to L/D BHA 100% Gas In Air (current) Background (max) 0 Trip 71 (max) 0 =10,000 Units -Connection 0Average C-1 C-5i 0 0 0 0 C-5n C-4i C-4n C-3 Chromatograph (ppm) 0 00 Max Gas = 71u 0 00 (current) Units* Gas Summary 0 00Minimum Depth 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Report By: Logging Engineers: Leigh Ann Rasher / Jade Miller C-2 Maximum 0 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 7RR 8.75 AK-AM-0900797980 $2,810.00 $136,358.10 J. Keener/O. Amend X-65 884' 8 150.0 2676'MD 13 3/8" in Size 8.75 Bit # Cement 15977' 15977' 9-Nov-2013 0' Lime Tuff Gvl 24 Hour Progress: (current) Alkal Coal Gallons/stroke API FL L-80 Mud 1.90 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.47 Depth in / out to L-80 Grade Set At 178.9 68.0 BTC Avg Clyst Ss Cht Silt Size 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 8.00 15 48 0.902 Footage Lst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 18 Siltst Lithology (%) Sh RPM Weight 0.902 Hydril 563 10.0 40.0 Type Condition 0-0-CT-N-X-IN-WT-DTF Comments Avg Min Depth 10548' WOB TFA %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 69/31 9.30 Report For: 15977'8.4 Current 96% 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 39 Customer: Well: Area: Location: Current Pump & Flow Data: Rig: 12:00 AM POOH w/ whipstock Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ROP ROP (ft/hr) 24 hr Max Density (ppg) * 24 hr Recap: Report By: Logging Engineers: Leigh Ann Rasher / Jade Miller C-2 Maximum 0 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Gas Summary 0 00Minimum Depth (current) Units* 00 0 0 00 Chromatograph (ppm) C-5n C-4i C-4n C-3 C-5i 0 0 0 0 Average C-1 0 =10,000 Units -Connection 0 Trip (max) 0 (current) Background (max) 100% Gas In Air L/D BHA #12. RIH to retrieve whipstock. POOH. . . ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM RIH w/ 5.5" liner Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 40 Customer: Well: Area: Location: Current Pump & Flow Data: PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Report For: 15977'8.5 Current 96% %Mud Type FAZEPRO - Ratio Mud Data (lb/100ft 2)cP 70/30 9.30 Avg Min Depth 10548' WOB TFA Condition 0-0-CT-N-X-IN-WT-DTF Comments 10.0 40.0 Type RPM 150.0 Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 19 14 51 0.902 Footage 105977' Lst 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 32.60 8.00 Avg Clyst Ss Cht Silt Size to L-80 Grade Set At 5429' 178.9 68.0 BTC SPP (psi) Date: Time: Cly (lb/bbl) ml/30min 2.47 Depth in / out API FL 0-0-CT-N-X-In-No-TD L-80 Mud 1.90 10.0 Alkal Coal Gallons/stroke (current) 15977' 15977' 10-Nov-2013 0' Lime Tuff Gvl 24 Hour Progress: Cement 884' 8RR2 150.0 2676'MD 13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 8RR 8.75 AK-AM-0900797980 $2,810.00 $139,168.10 J. Keener/O. Amend X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: L/D whipstock. R/U to RIH w/ 5.5" liner. RIH & tag TOL @ 7856' MD. Work liner through window. Cont RIH. 100% Gas In Air (current) Background (max) 0 Trip (max) 0 =10,000 Units -Connection 0Average C-1 C-5i 0 0 0 0 C-5n C-4i C-4n C-3 Chromatograph (ppm) 0 000 00 (current) Units* Gas Summary 0 00Minimum Depth 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Report By: Logging Engineers: Leigh Ann Rasher / Jade Miller C-2 Maximum 0 . . 20" 9 5/8" 8030'MD EVEMAR NORTH SLOPE DOYON15 Casing Summary 8RR 8.75 AK-AM-0900797980 $2,810.00 $141,978.10 J. Keener/O. Amend X-65 884' 8RR2 150.0 2676'MD 13 3/8" in Size 8.75 Bit # Cement 15977' 15977' 11-Nov-2013 0' Lime Tuff Gvl 24 Hour Progress: (current) Alkal Coal Gallons/stroke API FL 0-0-CT-N-X-In-No-TD L-80 Mud 10.0 SPP (psi) Date: Time: Cly (lb/bbl) ml/30min Depth in / out to L-80 Grade Set At 5429' 178.9 68.0 BTC Avg Clyst Ss Cht Silt Size 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 32.60 8.00 27 0.902 Footage 105977' Lst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' Siltst Lithology (%) Sh RPM 150.0 Weight 0.902 Hydril 563 10.0 40.0 Type Condition 0-0-CT-N-X-IN-WT-DTF Comments Avg Min Depth 10548' WOB TFA %Mud Type Brine Ratio Mud Data (lb/100ft 2)cP 9.20 Report For: 15977' Current 96% 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: ENI PETROLEUM SP08-N7L1 SPY ISLAND Max @ ft Morning Report Report # 41 Customer: Well: Area: Location: Current Pump & Flow Data: Rig: 12:00 AM L/D DP Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ROP ROP (ft/hr) 24 hr Max Density (ppg) * 24 hr Recap: Report By: Logging Engineers: Leigh Ann Rasher / Jade Miller C-2 Maximum 0 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Gas Summary 0 00Minimum Depth (current) Units* 00 0 0 00 Chromatograph (ppm) C-5n C-4i C-4n C-3 C-5i 0 0 0 0 Average C-1 0 =10,000 Units -Connection 0 Trip (max) 0 (current) Background (max) 100% Gas In Air Cont RIH w/ 5.5" liner to 15828' MD. Displace to brine. L/D 5" DP. . . ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM Set packoff Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7 SPY ISLAND Max @ ft Morning Report Report # 42 Customer: Well: Area: Location: Current Pump & Flow Data: PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Report For: 15977' Current 96% %Mud Type Brine Ratio Mud Data (lb/100ft 2)cP 9.20 Avg Min Depth 10548' WOB TFA Condition 0-0-CT-N-X-IN-WT-DTF Comments 10.0 40.0 Type RPM 150.0 Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 27 0.902 Footage 105977' Lst 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 32.60 8.00 Avg Clyst Ss Cht Silt Size to L-80 Grade Set At 5429' 178.9 68.0 BTC SPP (psi) Date: Time: Cly (lb/bbl) ml/30min Depth in / out API FL 0-0-CT-N-X-In-No-TD L-80 Mud 10.0 Alkal Coal Gallons/stroke (current) 15977' 15977' 12-Nov-2013 0' Lime Tuff Gvl 24 Hour Progress: Cement 884' 8RR2 150.0 2676'MD 13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 8RR 8.75 AK-AM-0900797980 $2,810.00 $144,788.10 J. Keener/R. Wimmer X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Cont L/D DP. Pull wear ring & install test plug. Test BOPs. Finish L/D DP. Prepare for comp equip & pump assembly. 100% Gas In Air (current) Background (max) 0 Trip (max) 0 =10,000 Units -Connection 0Average C-1 C-5i 0 0 0 0 C-5n C-4i C-4n C-3 Chromatograph (ppm) 0 000 R/U wireline. 00 (current) Units* Gas Summary 0 00Minimum Depth 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Report By: Logging Engineers: Leigh Ann Rasher / Jade Miller C-2 Maximum 0 . . ROP ROP (ft/hr) 24 hr Max Density (ppg) Rig: 12:00 AM RIH 4.5" comp tbg Yesterday's Depth: Current Depth: out (sec/qt) Viscosity ENI PETROLEUM SP08-N7 SPY ISLAND Max @ ft Morning Report Report # 43 Customer: Well: Area: Location: Current Pump & Flow Data: PV Cor Solids Job No.: Daily Charges: Total Charges: Rig Activity: 4.23 @ MWD Summary Depth YP Max ECD (ppg) Tools Report For: 15977' Current 96% %Mud Type Brine Ratio Mud Data (lb/100ft 2)cP 9.20 Avg Min Depth 10548' WOB TFA Condition 0-0-CT-N-X-IN-WT-DTF Comments 10.0 40.0 Type RPM 150.0 Weight 0.902 Hydril 563 Lithology (%) Sh Siltst Flow In (gpm) Flow In (spm) Oil / Water Hours 9664' 27 0.902 Footage 105977' Lst 160'MD Bit Type Hycalog SKH616M-E1D PDC Hycalog SKH616M-E1D PDC 10548' 32.60 8.00 Avg Clyst Ss Cht Silt Size to L-80 Grade Set At 5429' 178.9 68.0 BTC SPP (psi) Date: Time: Cly (lb/bbl) ml/30min Depth in / out API FL 0-0-CT-N-X-In-No-TD L-80 Mud 10.0 Alkal Coal Gallons/stroke (current) 15977' 15977' 13-Nov-2013 0' Lime Tuff Gvl 24 Hour Progress: Cement 884' 8RR2 150.0 2676'MD 13 3/8" in Size 8.75 Bit # NORTH SLOPE DOYON15 Casing Summary 8RR 8.75 AK-AM-0900797980 $2,810.00 $147,598.10 J. Keener/R. Wimmer X-65 20" 9 5/8" 8030'MD EVEMAR * 24 hr Recap: Test packoff & tool. M/U pump asmbly & RIH w/ lower comp. Cont RIH w/ 4.5" comp tubing. 100% Gas In Air (current) Background (max) 0 Trip (max) 0 =10,000 Units -Connection 0Average C-1 C-5i 0 0 0 0 C-5n C-4i C-4n C-3 Chromatograph (ppm) 0 000 00 (current) Units* Gas Summary 0 00Minimum Depth 907-685-0772 Unit # 110 Phone: 0 Leigh Ann Rasher 0 0 0 Report By: Logging Engineers: Leigh Ann Rasher / Jade Miller C-2 Maximum 0 WELL INFORMATION Customer :ENI PETROLEUM Well Name :SP08-N7 Job Number :AK-XX-0900797980 Rig Name :DOYON 15 Field Name :NIKAITCHUQ Country :USA Survey Report DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 140.00 0.00 0.00 N 0.00 E 0.00 0.00 40.83 0.00 140.00 40.83 0.00 N 0.00 E 0.00 0.00 73.34 0.38 256.80 73.34 0.02 S 0.10 W -0.02 1.17 117.51 0.57 244.66 117.51 0.15 S 0.45 W -0.15 0.48 161.25 0.64 233.85 161.25 0.39 S 0.84 W -0.39 0.31 254.18 0.78 187.00 254.17 1.32 S 1.34 W -1.32 0.62 283.28 0.86 176.32 283.27 1.74 S 1.35 W -1.74 0.59 313.50 1.11 165.10 313.48 2.25 S 1.26 W -2.25 1.04 347.03 1.51 152.07 347.00 2.95 S 0.97 W -2.95 1.48 377.21 1.85 144.19 377.17 3.70 S 0.49 W -3.70 1.36 409.39 1.93 142.39 409.33 4.55 S 0.14 E -4.55 0.31 440.20 2.11 140.16 440.12 5.39 S 0.82 E -5.39 0.64 455.28 2.21 138.13 455.19 5.82 S 1.19 E -5.82 0.83 548.94 3.04 135.50 548.75 8.94 S 4.14 E -8.94 0.90 579.98 3.02 135.70 579.75 10.11 S 5.29 E -10.11 0.07 639.66 4.19 137.50 639.31 12.85 S 7.86 E -12.85 1.97 697.00 5.60 140.48 696.44 16.55 S 11.05 E -16.55 2.50 789.98 8.76 138.57 788.68 25.36 S 18.63 E -25.36 3.41 883.32 13.08 136.88 880.31 38.40 S 30.55 E -38.40 4.64 976.59 16.08 136.90 970.56 55.54 S 46.60 E -55.54 3.22 1069.74 19.83 138.02 1,059.16 76.71 S 65.99 E -76.71 4.04 1163.02 22.63 139.40 1,146.10 102.11 S 88.25 E -102.11 3.05 1256.30 24.43 140.05 1,231.63 130.52 S 112.32 E -130.52 1.95 1349.28 28.63 139.92 1,314.80 162.32 S 139.02 E -162.32 4.52 1442.49 29.07 140.41 1,396.44 196.86 S 167.83 E -196.86 0.54 1535.72 27.69 139.90 1,478.46 230.88 S 196.22 E -230.88 1.50 1629.11 26.63 140.77 1,561.55 263.69 S 223.43 E -263.69 1.21 1722.34 26.17 141.18 1,645.06 295.90 S 249.53 E -295.90 0.53 1815.56 24.94 140.79 1,729.16 327.14 S 274.85 E -327.14 1.33 1908.91 30.16 139.24 1,811.89 360.18 S 302.62 E -360.18 5.64 2002.13 30.62 133.11 1,892.33 394.15 S 335.25 E -394.15 3.36 2095.48 29.07 127.95 1,973.31 424.35 S 370.49 E -424.35 3.21 INSITE V7.4.20 Page 1Job No:AK-XX-0900797980 Well Name:SP08-N7 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2188.72 29.54 119.86 2,054.65 449.73 S 408.31 E -449.73 4.27 2282.00 30.39 113.05 2,135.48 470.43 S 449.97 E -470.43 3.76 2375.18 30.79 106.46 2,215.72 486.42 S 494.54 E -486.42 3.62 2468.56 31.77 100.62 2,295.54 497.72 S 541.64 E -497.72 3.41 2561.73 31.77 94.07 2,374.77 503.99 S 590.23 E -503.99 3.70 2609.64 33.11 90.23 2,415.21 504.93 S 615.90 E -504.93 5.13 2703.48 33.63 84.15 2,493.60 502.39 S 667.39 E -502.39 3.61 2750.38 33.82 84.72 2,532.61 499.86 S 693.31 E -499.86 0.79 2809.60 34.20 84.19 2,581.70 496.66 S 726.28 E -496.66 0.81 2843.73 34.79 83.32 2,609.83 494.56 S 745.49 E -494.56 2.25 2937.12 38.43 79.03 2,684.79 485.93 S 800.47 E -485.93 4.76 3031.26 42.22 73.92 2,756.57 471.59 S 859.62 E -471.59 5.34 3123.89 45.08 70.56 2,823.60 452.05 S 920.48 E -452.05 3.97 3218.12 46.51 67.46 2,889.30 427.84 S 983.52 E -427.84 2.80 3310.73 48.33 63.97 2,951.97 399.78 S 1,045.64 E -399.78 3.40 3404.09 51.24 58.54 3,012.27 365.45 S 1,108.06 E -365.45 5.42 3497.43 53.91 54.23 3,069.01 324.40 S 1,169.74 E -324.40 4.65 3590.83 56.03 51.87 3,122.62 278.41 S 1,230.83 E -278.41 3.07 3684.19 59.61 51.48 3,172.34 229.42 S 1,292.81 E -229.42 3.85 3777.55 62.90 51.43 3,217.23 178.42 S 1,356.82 E -178.42 3.52 3870.90 66.21 52.77 3,257.33 126.66 S 1,423.33 E -126.66 3.78 3964.32 68.18 51.32 3,293.54 73.69 S 1,491.23 E -73.69 2.55 4057.64 71.12 49.72 3,325.99 18.06 S 1,558.74 E -18.06 3.54 4151.00 75.46 48.63 3,352.83 40.39 N 1,626.38 E 40.39 4.78 4244.34 78.60 48.07 3,373.78 100.83 N 1,694.34 E 100.83 3.41 4337.67 78.98 44.94 3,391.92 163.84 N 1,760.74 E 163.84 3.31 4431.03 78.78 44.16 3,409.93 229.12 N 1,825.00 E 229.12 0.85 4524.43 79.49 42.10 3,427.54 296.06 N 1,887.71 E 296.06 2.30 4617.73 79.11 40.14 3,444.86 365.12 N 1,948.00 E 365.12 2.10 4711.02 77.68 38.14 3,463.63 435.99 N 2,005.68 E 435.99 2.60 4804.38 79.45 36.27 3,482.14 508.87 N 2,061.00 E 508.87 2.73 4897.65 78.91 34.86 3,499.65 583.39 N 2,114.28 E 583.39 1.59 4991.01 77.26 33.57 3,518.93 658.92 N 2,165.65 E 658.92 2.23 5084.27 77.34 31.65 3,539.43 735.55 N 2,214.67 E 735.55 2.01 5177.78 77.49 29.36 3,559.81 814.18 N 2,261.00 E 814.18 2.40 5271.20 77.86 25.78 3,579.75 895.07 N 2,303.23 E 895.07 3.76 5364.68 78.92 23.15 3,598.57 978.41 N 2,341.14 E 978.41 2.98 5458.11 79.46 19.59 3,616.10 1,063.86 N 2,374.58 E 1063.86 3.79 5551.45 79.92 17.43 3,632.81 1,150.93 N 2,403.73 E 1150.93 2.33 5644.82 79.39 16.19 3,649.57 1,238.86 N 2,430.29 E 1238.86 1.42 5737.51 78.58 14.01 3,667.29 1,326.69 N 2,453.99 E 1326.69 2.47 5830.85 79.25 9.88 3,685.24 1,416.29 N 2,472.94 E 1416.29 4.40 5924.14 79.03 6.46 3,702.82 1,506.96 N 2,485.96 E 1506.96 3.61 6017.32 77.49 2.43 3,721.79 1,597.89 N 2,493.04 E 1597.89 4.55 6110.61 77.75 356.75 3,741.80 1,688.97 N 2,492.39 E 1688.97 5.95 INSITE V7.4.20 Page 2Job No:AK-XX-0900797980 Well Name:SP08-N7 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6203.95 77.40 350.79 3,761.90 1,779.54 N 2,482.50 E 1779.54 6.25 6297.22 76.62 346.09 3,782.88 1,868.55 N 2,464.30 E 1868.56 4.98 6390.37 77.60 343.31 3,803.66 1,956.13 N 2,440.34 E 1956.13 3.09 6483.65 78.08 341.22 3,823.31 2,042.98 N 2,412.56 E 2042.98 2.25 6576.93 80.45 340.62 3,840.69 2,129.58 N 2,382.60 E 2129.58 2.62 6669.91 80.08 340.44 3,856.41 2,215.98 N 2,352.06 E 2215.98 0.44 6763.12 80.24 339.68 3,872.34 2,302.31 N 2,320.74 E 2302.31 0.82 6856.35 79.55 338.35 3,888.70 2,388.01 N 2,287.87 E 2388.01 1.59 6949.74 78.62 334.66 3,906.39 2,472.09 N 2,251.32 E 2472.09 4.01 7042.97 79.66 332.36 3,923.96 2,554.03 N 2,210.48 E 2554.03 2.67 7136.19 80.64 330.29 3,939.90 2,634.60 N 2,166.41 E 2634.60 2.43 7229.54 80.79 329.06 3,954.97 2,714.12 N 2,119.90 E 2714.12 1.31 7322.76 82.66 325.57 3,968.39 2,791.75 N 2,070.09 E 2791.75 4.21 7416.11 83.06 323.39 3,979.99 2,867.13 N 2,016.28 E 2867.13 2.36 7509.35 83.05 321.64 3,991.27 2,940.57 N 1,959.95 E 2940.57 1.86 7602.63 80.94 316.87 4,004.26 3,010.54 N 1,899.69 E 3010.54 5.55 7696.60 80.30 310.38 4,019.59 3,074.47 N 1,832.62 E 3074.47 6.85 7789.19 80.29 307.59 4,035.20 3,131.88 N 1,761.69 E 3131.88 2.97 7882.37 81.99 308.44 4,049.56 3,188.58 N 1,689.15 E 3188.58 2.03 7975.59 83.09 309.13 4,061.66 3,246.48 N 1,617.11 E 3246.48 1.39 8000.95 83.52 309.14 4,064.62 3,262.37 N 1,597.57 E 3262.38 1.70 8078.71 85.79 310.53 4,071.86 3,311.97 N 1,538.12 E 3311.97 3.42 8103.49 84.33 310.75 4,073.99 3,328.05 N 1,519.39 E 3328.05 5.96 8196.81 82.82 310.31 4,084.44 3,388.31 N 1,448.91 E 3388.31 1.68 8290.11 83.53 310.34 4,095.52 3,448.25 N 1,378.28 E 3448.26 0.76 8383.43 85.99 310.92 4,104.05 3,508.76 N 1,307.76 E 3508.76 2.71 8476.79 87.13 312.46 4,109.65 3,570.74 N 1,238.18 E 3570.74 2.05 8570.15 91.42 315.78 4,110.83 3,635.71 N 1,171.19 E 3635.71 5.81 8663.48 90.74 314.16 4,109.07 3,701.65 N 1,105.17 E 3701.65 1.88 8756.85 89.32 315.63 4,109.02 3,767.55 N 1,039.03 E 3767.55 2.19 8850.23 87.82 312.69 4,111.35 3,832.58 N 972.07 E 3832.58 3.53 8943.60 88.01 310.78 4,114.75 3,894.69 N 902.44 E 3894.69 2.05 9036.93 89.23 311.88 4,117.00 3,956.30 N 832.38 E 3956.30 1.76 9130.28 90.30 310.02 4,117.38 4,017.48 N 761.88 E 4017.48 2.30 9223.64 90.42 308.24 4,116.79 4,076.40 N 689.47 E 4076.40 1.91 9317.03 92.49 307.75 4,114.42 4,133.86 N 615.90 E 4133.86 2.28 9410.41 90.34 307.75 4,112.12 4,191.01 N 542.09 E 4191.01 2.30 9503.88 91.11 307.83 4,110.93 4,248.28 N 468.23 E 4248.28 0.83 9597.27 91.83 308.14 4,108.54 4,305.74 N 394.65 E 4305.74 0.84 9690.62 89.79 306.67 4,107.22 4,362.43 N 320.51 E 4362.43 2.69 9784.02 93.41 307.40 4,104.61 4,418.66 N 245.99 E 4418.66 3.95 9877.50 91.20 306.35 4,100.85 4,474.70 N 171.28 E 4474.70 2.62 9970.90 90.67 304.10 4,099.33 4,528.56 N 94.99 E 4528.56 2.47 10064.25 93.17 307.39 4,096.20 4,583.05 N 19.29 E 4583.05 4.42 10157.46 93.07 306.85 4,091.13 4,639.22 N 54.93 W 4639.22 0.59 INSITE V7.4.20 Page 3Job No:AK-XX-0900797980 Well Name:SP08-N7 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10250.90 91.36 305.08 4,087.51 4,694.05 N 130.49 W 4694.05 2.63 10344.24 90.51 304.53 4,085.99 4,747.32 N 207.12 W 4747.32 1.08 10437.59 89.82 305.85 4,085.72 4,801.11 N 283.41 W 4801.11 1.60 10530.98 90.80 306.97 4,085.22 4,856.54 N 358.57 W 4856.54 1.59 10624.37 91.91 309.87 4,083.01 4,914.55 N 431.71 W 4914.55 3.32 10717.75 91.69 311.38 4,080.07 4,975.32 N 502.54 W 4975.32 1.63 10811.17 88.90 308.65 4,079.59 5,035.38 N 574.08 W 5035.38 4.18 10904.59 90.27 313.19 4,080.27 5,096.55 N 644.65 W 5096.55 5.08 10997.95 90.99 317.44 4,079.24 5,162.91 N 710.28 W 5162.91 4.62 11091.29 90.96 316.45 4,077.66 5,231.10 N 773.99 W 5231.10 1.06 11184.69 89.12 315.89 4,077.59 5,298.48 N 838.67 W 5298.48 2.06 11278.05 86.14 314.81 4,081.45 5,364.83 N 904.21 W 5364.83 3.39 11371.41 87.81 314.79 4,086.38 5,430.52 N 970.37 W 5430.52 1.79 11464.76 90.78 315.59 4,087.53 5,496.73 N 1,036.14 W 5496.73 3.29 11558.18 91.94 314.83 4,085.31 5,563.01 N 1,101.94 W 5563.01 1.48 11651.50 91.93 314.77 4,082.16 5,628.73 N 1,168.12 W 5628.73 0.07 11744.86 92.38 313.83 4,078.65 5,693.89 N 1,234.89 W 5693.89 1.12 11838.20 92.48 312.87 4,074.69 5,757.90 N 1,302.70 W 5757.90 1.03 11931.53 91.62 312.99 4,071.35 5,821.43 N 1,370.99 W 5821.43 0.93 12024.89 90.98 312.22 4,069.23 5,884.61 N 1,439.69 W 5884.61 1.07 12118.29 91.15 312.73 4,067.50 5,947.67 N 1,508.56 W 5947.67 0.58 12211.59 92.12 312.32 4,064.83 6,010.71 N 1,577.30 W 6010.71 1.13 12304.88 92.76 311.58 4,060.86 6,073.01 N 1,646.61 W 6073.01 1.05 12398.24 92.66 309.77 4,056.45 6,133.79 N 1,717.34 W 6133.79 1.94 12491.51 94.03 309.59 4,051.01 6,193.24 N 1,789.00 W 6193.24 1.48 12584.87 93.93 308.58 4,044.53 6,251.96 N 1,861.29 W 6251.96 1.08 12678.23 90.87 308.90 4,040.62 6,310.32 N 1,934.04 W 6310.32 3.30 12771.64 87.65 308.22 4,041.82 6,368.54 N 2,007.06 W 6368.54 3.52 12865.06 89.58 310.15 4,044.08 6,427.54 N 2,079.44 W 6427.54 2.92 12958.54 90.82 311.33 4,043.76 6,488.54 N 2,150.27 W 6488.54 1.83 13051.97 89.74 311.55 4,043.30 6,550.38 N 2,220.31 W 6550.38 1.18 13145.31 89.93 311.47 4,043.57 6,612.24 N 2,290.20 W 6612.24 0.22 13238.68 90.35 311.38 4,043.34 6,674.02 N 2,360.21 W 6674.02 0.46 13332.14 90.31 310.86 4,042.80 6,735.48 N 2,430.62 W 6735.48 0.56 13425.48 90.27 309.88 4,042.33 6,795.93 N 2,501.73 W 6795.93 1.05 13518.77 91.00 309.78 4,041.29 6,855.68 N 2,573.37 W 6855.68 0.79 13611.95 91.58 309.85 4,039.20 6,915.33 N 2,644.92 W 6915.33 0.63 13705.24 91.51 309.74 4,036.68 6,975.02 N 2,716.58 W 6975.02 0.14 13798.58 90.29 309.11 4,035.22 7,034.29 N 2,788.67 W 7034.29 1.47 13891.85 88.93 308.61 4,035.85 7,092.80 N 2,861.29 W 7092.80 1.55 13985.00 88.27 308.60 4,038.13 7,150.91 N 2,934.06 W 7150.91 0.71 14078.28 87.19 308.39 4,041.82 7,208.92 N 3,007.01 W 7208.92 1.18 14171.56 87.63 308.94 4,046.04 7,267.14 N 3,079.77 W 7267.14 0.75 14264.54 89.33 309.66 4,048.50 7,326.01 N 3,151.69 W 7326.01 1.99 14357.75 90.07 310.89 4,048.99 7,386.26 N 3,222.80 W 7386.26 1.54 INSITE V7.4.20 Page 4Job No:AK-XX-0900797980 Well Name:SP08-N7 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14450.98 90.03 310.93 4,048.91 7,447.32 N 3,293.26 W 7447.32 0.06 14544.37 90.02 311.80 4,048.87 7,509.03 N 3,363.35 W 7509.03 0.93 14637.60 89.15 311.51 4,049.54 7,571.00 N 3,433.01 W 7571.00 0.98 14730.82 90.89 313.75 4,049.51 7,634.12 N 3,501.59 W 7634.12 3.04 14824.17 90.81 314.39 4,048.13 7,699.04 N 3,568.65 W 7699.04 0.69 14917.39 90.42 313.41 4,047.13 7,763.68 N 3,635.81 W 7763.68 1.13 15010.74 88.12 311.77 4,048.32 7,826.84 N 3,704.53 W 7826.84 3.03 15103.98 88.08 311.73 4,051.41 7,888.89 N 3,774.05 W 7888.89 0.06 15197.26 86.85 312.30 4,055.53 7,951.27 N 3,843.29 W 7951.27 1.45 15290.44 91.72 312.63 4,056.70 8,014.15 N 3,912.00 W 8014.15 5.24 15383.82 93.03 314.08 4,052.83 8,078.20 N 3,979.83 W 8078.20 2.09 15477.14 94.21 312.82 4,046.93 8,142.25 N 4,047.44 W 8142.25 1.85 15570.22 95.08 311.67 4,039.40 8,204.62 N 4,116.12 W 8204.62 1.55 15663.42 96.63 310.99 4,029.89 8,265.85 N 4,185.74 W 8265.85 1.81 15756.59 99.20 311.76 4,017.06 8,326.84 N 4,254.98 W 8326.84 2.88 15804.57 100.54 312.74 4,008.83 8,358.62 N 4,289.97 W 8358.62 3.44 15870.00 100.54 312.74 3,996.87 8,402.27 N 4,337.22 W 8402.27 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (True) - A total correction of 19.69 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 15,870.00 feet is 9,455.67 feet along 332.70 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V7.4.20 Page 5Job No:AK-XX-0900797980 Well Name:SP08-N7 Survey Report WELL INFORMATION Customer :ENI PETROLEUM Well Name :SP08-N7L1 Job Number :AK-XX-0900797980 Rig Name :DOYON 15 Field Name :NIKAITCHUQ Country :USA Survey Report DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 140.00 0.00 0.00 N 0.00 E 0.00 0.00 40.83 0.00 140.00 40.83 0.00 N 0.00 E 0.00 0.00 73.34 0.38 256.80 73.34 0.02 S 0.10 W -0.02 1.17 117.51 0.57 244.66 117.51 0.15 S 0.45 W -0.15 0.48 161.25 0.64 233.85 161.25 0.39 S 0.84 W -0.39 0.31 254.18 0.78 187.00 254.17 1.32 S 1.34 W -1.32 0.62 283.28 0.86 176.32 283.27 1.74 S 1.35 W -1.74 0.59 313.50 1.11 165.10 313.48 2.25 S 1.26 W -2.25 1.04 347.03 1.51 152.07 347.00 2.95 S 0.97 W -2.95 1.48 377.21 1.85 144.19 377.17 3.70 S 0.49 W -3.70 1.36 409.39 1.93 142.39 409.33 4.55 S 0.14 E -4.55 0.31 440.20 2.11 140.16 440.12 5.39 S 0.82 E -5.39 0.64 455.28 2.21 138.13 455.19 5.82 S 1.19 E -5.82 0.83 548.94 3.04 135.50 548.75 8.94 S 4.14 E -8.94 0.90 579.98 3.02 135.70 579.75 10.11 S 5.29 E -10.11 0.07 639.66 4.19 137.50 639.31 12.85 S 7.86 E -12.85 1.97 697.00 5.60 140.48 696.44 16.55 S 11.05 E -16.55 2.50 789.98 8.76 138.57 788.68 25.36 S 18.63 E -25.36 3.41 883.32 13.08 136.88 880.31 38.40 S 30.55 E -38.40 4.64 976.59 16.08 136.90 970.56 55.54 S 46.60 E -55.54 3.22 1069.74 19.83 138.02 1,059.16 76.71 S 65.99 E -76.71 4.04 1163.02 22.63 139.40 1,146.10 102.11 S 88.25 E -102.11 3.05 1256.30 24.43 140.05 1,231.63 130.52 S 112.32 E -130.52 1.95 1349.28 28.63 139.92 1,314.80 162.32 S 139.02 E -162.32 4.52 1442.49 29.07 140.41 1,396.44 196.86 S 167.83 E -196.86 0.54 1535.72 27.69 139.90 1,478.46 230.88 S 196.22 E -230.88 1.50 1629.11 26.63 140.77 1,561.55 263.69 S 223.43 E -263.69 1.21 1722.34 26.17 141.18 1,645.06 295.90 S 249.53 E -295.90 0.53 1815.56 24.94 140.79 1,729.16 327.14 S 274.85 E -327.14 1.33 1908.91 30.16 139.24 1,811.89 360.18 S 302.62 E -360.18 5.64 2002.13 30.62 133.11 1,892.33 394.15 S 335.25 E -394.15 3.36 2095.48 29.07 127.95 1,973.31 424.35 S 370.49 E -424.35 3.21 INSITE V7.4.20 Page 1Job No:AK-XX-0900797980 Well Name:SP08-N7L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2188.72 29.54 119.86 2,054.65 449.73 S 408.31 E -449.73 4.27 2282.00 30.39 113.05 2,135.48 470.43 S 449.97 E -470.43 3.76 2375.18 30.79 106.46 2,215.72 486.42 S 494.54 E -486.42 3.62 2468.56 31.77 100.62 2,295.54 497.72 S 541.64 E -497.72 3.41 2561.73 31.77 94.07 2,374.77 503.99 S 590.23 E -503.99 3.70 2609.64 33.11 90.23 2,415.21 504.93 S 615.90 E -504.93 5.13 2703.48 33.63 84.15 2,493.60 502.39 S 667.39 E -502.39 3.61 2750.38 33.82 84.72 2,532.61 499.86 S 693.31 E -499.86 0.79 2809.60 34.20 84.19 2,581.70 496.66 S 726.28 E -496.66 0.81 2843.73 34.79 83.32 2,609.83 494.56 S 745.49 E -494.56 2.25 2937.12 38.43 79.03 2,684.79 485.93 S 800.47 E -485.93 4.76 3031.26 42.22 73.92 2,756.57 471.59 S 859.62 E -471.59 5.34 3123.89 45.08 70.56 2,823.60 452.05 S 920.48 E -452.05 3.97 3218.12 46.51 67.46 2,889.30 427.84 S 983.52 E -427.84 2.80 3310.73 48.33 63.97 2,951.97 399.78 S 1,045.64 E -399.78 3.40 3404.09 51.24 58.54 3,012.27 365.45 S 1,108.06 E -365.45 5.42 3497.43 53.91 54.23 3,069.01 324.40 S 1,169.74 E -324.40 4.65 3590.83 56.03 51.87 3,122.62 278.41 S 1,230.83 E -278.41 3.07 3684.19 59.61 51.48 3,172.34 229.42 S 1,292.81 E -229.42 3.85 3777.55 62.90 51.43 3,217.23 178.42 S 1,356.82 E -178.42 3.52 3870.90 66.21 52.77 3,257.33 126.66 S 1,423.33 E -126.66 3.78 3964.32 68.18 51.32 3,293.54 73.69 S 1,491.23 E -73.69 2.55 4057.64 71.12 49.72 3,325.99 18.06 S 1,558.74 E -18.06 3.54 4151.00 75.46 48.63 3,352.83 40.39 N 1,626.38 E 40.39 4.78 4244.34 78.60 48.07 3,373.78 100.83 N 1,694.34 E 100.83 3.41 4337.67 78.98 44.94 3,391.92 163.84 N 1,760.74 E 163.84 3.31 4431.03 78.78 44.16 3,409.93 229.12 N 1,825.00 E 229.12 0.85 4524.43 79.49 42.10 3,427.54 296.06 N 1,887.71 E 296.06 2.30 4617.73 79.11 40.14 3,444.86 365.12 N 1,948.00 E 365.12 2.10 4711.02 77.68 38.14 3,463.63 435.99 N 2,005.68 E 435.99 2.60 4804.38 79.45 36.27 3,482.14 508.87 N 2,061.00 E 508.87 2.73 4897.65 78.91 34.86 3,499.65 583.39 N 2,114.28 E 583.39 1.59 4991.01 77.26 33.57 3,518.93 658.92 N 2,165.65 E 658.92 2.23 5084.27 77.34 31.65 3,539.43 735.55 N 2,214.67 E 735.55 2.01 5177.78 77.49 29.36 3,559.81 814.18 N 2,261.00 E 814.18 2.40 5271.20 77.86 25.78 3,579.75 895.07 N 2,303.23 E 895.07 3.76 5364.68 78.92 23.15 3,598.57 978.41 N 2,341.14 E 978.41 2.98 5458.11 79.46 19.59 3,616.10 1,063.86 N 2,374.58 E 1063.86 3.79 5551.45 79.92 17.43 3,632.81 1,150.93 N 2,403.73 E 1150.93 2.33 5644.82 79.39 16.19 3,649.57 1,238.86 N 2,430.29 E 1238.86 1.42 5737.51 78.58 14.01 3,667.29 1,326.69 N 2,453.99 E 1326.69 2.47 5830.85 79.25 9.88 3,685.24 1,416.29 N 2,472.94 E 1416.29 4.40 5924.14 79.03 6.46 3,702.82 1,506.96 N 2,485.96 E 1506.96 3.61 6017.32 77.49 2.43 3,721.79 1,597.89 N 2,493.04 E 1597.89 4.55 6110.61 77.75 356.75 3,741.80 1,688.97 N 2,492.39 E 1688.97 5.95 INSITE V7.4.20 Page 2Job No:AK-XX-0900797980 Well Name:SP08-N7L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6203.95 77.40 350.79 3,761.90 1,779.54 N 2,482.50 E 1779.54 6.25 6297.22 76.62 346.09 3,782.88 1,868.55 N 2,464.30 E 1868.56 4.98 6390.37 77.60 343.31 3,803.66 1,956.13 N 2,440.34 E 1956.13 3.09 6483.65 78.08 341.22 3,823.31 2,042.98 N 2,412.56 E 2042.98 2.25 6576.93 80.45 340.62 3,840.69 2,129.58 N 2,382.60 E 2129.58 2.62 6669.91 80.08 340.44 3,856.41 2,215.98 N 2,352.06 E 2215.98 0.44 6763.12 80.24 339.68 3,872.34 2,302.31 N 2,320.74 E 2302.31 0.82 6856.35 79.55 338.35 3,888.70 2,388.01 N 2,287.87 E 2388.01 1.59 6949.74 78.62 334.66 3,906.39 2,472.09 N 2,251.32 E 2472.09 4.01 7042.97 79.66 332.36 3,923.96 2,554.03 N 2,210.48 E 2554.03 2.67 7136.19 80.64 330.29 3,939.90 2,634.60 N 2,166.41 E 2634.60 2.43 7229.54 80.79 329.06 3,954.97 2,714.12 N 2,119.90 E 2714.12 1.31 7322.76 82.66 325.57 3,968.39 2,791.75 N 2,070.09 E 2791.75 4.21 7416.11 83.06 323.39 3,979.99 2,867.13 N 2,016.28 E 2867.13 2.36 7509.35 83.05 321.64 3,991.27 2,940.57 N 1,959.95 E 2940.57 1.86 7602.63 80.94 316.87 4,004.26 3,010.54 N 1,899.69 E 3010.54 5.55 7696.60 80.30 310.38 4,019.59 3,074.47 N 1,832.62 E 3074.47 6.85 7789.19 80.29 307.59 4,035.20 3,131.88 N 1,761.69 E 3131.88 2.97 7791.00 80.32 307.61 4,035.51 3,132.97 N 1,760.27 E 3132.97 1.98 7808.00 82.04 306.37 4,038.12 3,143.08 N 1,746.86 E 3143.08 12.42 7899.43 84.54 303.00 4,048.80 3,194.73 N 1,672.20 E 3194.73 4.57 7972.80 86.20 299.48 4,054.73 3,232.65 N 1,609.69 E 3232.65 5.29 8062.67 85.00 300.03 4,061.62 3,277.12 N 1,531.90 E 3277.12 1.47 8104.24 85.18 297.39 4,065.18 3,297.01 N 1,495.57 E 3297.01 6.34 8197.56 85.39 294.73 4,072.85 3,337.87 N 1,412.03 E 3337.87 2.85 8290.86 86.37 299.75 4,079.56 3,380.45 N 1,329.32 E 3380.45 5.47 8384.18 87.26 306.42 4,084.75 3,431.28 N 1,251.30 E 3431.28 7.20 8477.54 86.66 309.05 4,089.70 3,488.33 N 1,177.58 E 3488.33 2.89 8570.90 88.58 307.39 4,093.58 3,546.04 N 1,104.30 E 3546.04 2.72 8664.23 89.63 306.83 4,095.04 3,602.34 N 1,029.88 E 3602.34 1.28 8757.60 91.58 303.77 4,094.05 3,656.28 N 953.69 E 3656.29 3.89 8850.98 91.48 302.34 4,091.56 3,707.20 N 875.46 E 3707.20 1.53 8944.35 91.49 302.09 4,089.14 3,756.96 N 796.49 E 3756.96 0.27 9037.68 92.42 302.64 4,085.95 3,806.89 N 717.70 E 3806.89 1.16 9131.03 92.46 302.41 4,081.98 3,857.03 N 639.07 E 3857.03 0.25 9224.39 90.99 302.55 4,079.17 3,907.14 N 560.35 E 3907.14 1.58 9317.78 91.26 303.46 4,077.34 3,958.00 N 482.04 E 3958.00 1.02 9411.16 90.08 304.82 4,076.24 4,010.40 N 404.77 E 4010.41 1.93 9504.63 90.30 304.58 4,075.93 4,063.62 N 327.92 E 4063.62 0.35 9598.04 91.18 304.25 4,074.73 4,116.40 N 250.87 E 4116.40 1.01 9690.67 89.44 306.27 4,074.23 4,169.87 N 175.24 E 4169.87 2.88 9784.07 87.74 308.77 4,076.52 4,226.73 N 101.19 E 4226.73 3.24 9877.55 87.73 312.22 4,080.22 4,287.38 N 30.17 E 4287.38 3.69 9970.95 87.39 313.26 4,084.20 4,350.71 N 38.37 W 4350.71 1.17 10064.30 89.09 313.03 4,087.06 4,414.51 N 106.44 W 4414.51 1.84 INSITE V7.4.20 Page 3Job No:AK-XX-0900797980 Well Name:SP08-N7L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10157.51 89.27 312.73 4,088.40 4,477.93 N 174.74 W 4477.93 0.38 10250.95 89.25 312.80 4,089.60 4,541.37 N 243.33 W 4541.37 0.08 10344.29 88.57 312.62 4,091.38 4,604.67 N 311.90 W 4604.67 0.75 10437.64 89.60 312.10 4,092.87 4,667.56 N 380.87 W 4667.56 1.24 10478.04 91.39 312.47 4,092.52 4,694.74 N 410.76 W 4694.74 4.52 10531.73 92.10 313.97 4,090.89 4,731.49 N 449.86 W 4731.49 3.09 10625.12 92.88 313.92 4,086.83 4,796.24 N 517.04 W 4796.24 0.84 10718.50 93.69 313.50 4,081.48 4,860.66 N 584.43 W 4860.66 0.98 10811.92 94.27 313.61 4,074.99 4,924.87 N 651.97 W 4924.87 0.63 10905.34 94.16 313.41 4,068.13 4,989.02 N 719.54 W 4989.02 0.24 10998.70 92.28 312.93 4,062.88 5,052.79 N 787.52 W 5052.79 2.08 11092.04 88.58 312.43 4,062.18 5,116.05 N 856.12 W 5116.05 4.00 11185.44 89.90 311.61 4,063.42 5,178.56 N 925.50 W 5178.56 1.66 11278.80 91.41 313.71 4,062.36 5,241.82 N 994.15 W 5241.82 2.77 11372.16 91.04 313.31 4,060.36 5,306.08 N 1,061.84 W 5306.08 0.58 11465.51 92.50 311.58 4,057.48 5,369.04 N 1,130.69 W 5369.05 2.42 11558.93 93.05 311.05 4,052.95 5,430.65 N 1,200.77 W 5430.65 0.82 11652.25 91.55 311.57 4,049.21 5,492.20 N 1,270.81 W 5492.20 1.70 11745.61 88.58 310.79 4,049.10 5,553.66 N 1,341.07 W 5553.66 3.29 11838.95 89.19 311.04 4,050.92 5,614.78 N 1,411.59 W 5614.78 0.71 11932.28 91.12 311.46 4,050.67 5,676.32 N 1,481.76 W 5676.32 2.12 12025.64 90.10 312.62 4,049.67 5,738.83 N 1,551.09 W 5738.83 1.65 12119.04 89.94 313.75 4,049.64 5,802.75 N 1,619.19 W 5802.75 1.22 12212.34 88.57 313.41 4,050.85 5,867.06 N 1,686.77 W 5867.06 1.51 12305.63 88.68 312.62 4,053.09 5,930.68 N 1,754.96 W 5930.68 0.85 12398.99 88.82 313.22 4,055.13 5,994.24 N 1,823.31 W 5994.24 0.66 12492.26 87.80 313.02 4,057.88 6,057.97 N 1,891.36 W 6057.97 1.11 12585.62 89.02 313.05 4,060.47 6,121.65 N 1,959.58 W 6121.65 1.31 12678.88 90.30 313.72 4,061.02 6,185.71 N 2,027.35 W 6185.71 1.55 12772.39 90.63 314.48 4,060.26 6,250.78 N 2,094.50 W 6250.78 0.89 12865.81 90.65 313.21 4,059.22 6,315.49 N 2,161.87 W 6315.49 1.36 12959.29 91.07 313.26 4,057.82 6,379.52 N 2,229.97 W 6379.52 0.45 13052.72 90.92 313.75 4,056.19 6,443.82 N 2,297.72 W 6443.82 0.55 13146.06 90.67 312.09 4,054.90 6,507.38 N 2,366.07 W 6507.38 1.80 13239.43 92.25 313.48 4,052.52 6,570.77 N 2,434.57 W 6570.78 2.25 13332.89 92.47 313.28 4,048.67 6,634.91 N 2,502.44 W 6634.91 0.32 13426.23 91.97 312.72 4,045.06 6,698.52 N 2,570.65 W 6698.52 0.80 13519.52 92.69 312.75 4,041.26 6,761.78 N 2,639.11 W 6761.78 0.77 13612.70 89.65 312.07 4,039.36 6,824.60 N 2,707.89 W 6824.60 3.34 13705.99 89.85 312.14 4,039.77 6,887.15 N 2,777.10 W 6887.15 0.23 13799.33 90.06 311.19 4,039.84 6,949.20 N 2,846.83 W 6949.20 1.04 13892.60 91.24 310.57 4,038.78 7,010.23 N 2,917.34 W 7010.24 1.43 13985.75 90.54 309.73 4,037.34 7,070.29 N 2,988.53 W 7070.29 1.17 14079.03 89.00 309.09 4,037.71 7,129.51 N 3,060.60 W 7129.51 1.79 14172.31 88.82 309.52 4,039.49 7,188.58 N 3,132.77 W 7188.58 0.50 INSITE V7.4.20 Page 4Job No:AK-XX-0900797980 Well Name:SP08-N7L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 14265.29 88.97 309.66 4,041.28 7,247.83 N 3,204.41 W 7247.83 0.22 14358.50 88.88 310.74 4,043.03 7,307.98 N 3,275.59 W 7307.98 1.16 14451.73 90.18 312.60 4,043.79 7,369.96 N 3,345.22 W 7369.96 2.43 14545.12 89.67 312.48 4,043.91 7,433.10 N 3,414.03 W 7433.10 0.56 14638.35 90.91 313.10 4,043.44 7,496.43 N 3,482.44 W 7496.43 1.49 14731.57 90.73 312.94 4,042.11 7,560.02 N 3,550.59 W 7560.02 0.26 14824.92 89.92 312.94 4,041.58 7,623.61 N 3,618.93 W 7623.61 0.87 14918.14 90.03 312.16 4,041.62 7,686.65 N 3,687.60 W 7686.65 0.85 15011.49 91.16 312.72 4,040.65 7,749.64 N 3,756.49 W 7749.64 1.35 15104.73 91.21 312.79 4,038.72 7,812.92 N 3,824.94 W 7812.92 0.09 15198.01 95.37 312.21 4,033.37 7,875.82 N 3,893.58 W 7875.82 4.50 15291.19 94.43 312.30 4,025.41 7,938.25 N 3,962.30 W 7938.25 1.01 15384.57 91.37 311.41 4,020.69 8,000.47 N 4,031.75 W 8000.47 3.41 15477.75 89.99 310.66 4,019.58 8,061.64 N 4,102.03 W 8061.64 1.69 15570.97 90.39 310.62 4,019.27 8,122.35 N 4,172.77 W 8122.35 0.43 15664.17 90.87 310.23 4,018.25 8,182.78 N 4,243.71 W 8182.79 0.66 15757.34 91.88 311.28 4,016.01 8,243.59 N 4,314.27 W 8243.59 1.56 15850.64 91.73 312.09 4,013.07 8,305.61 N 4,383.91 W 8305.61 0.88 15912.84 92.71 310.85 4,010.66 8,346.76 N 4,430.48 W 8346.77 2.54 15977.00 92.71 310.85 4,007.63 8,388.68 N 4,478.96 W 8388.68 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (True) - A total correction of 19.69 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 15,977.00 feet is 9,509.52 feet along 331.90 degrees (True) INSITE V7.4.20 Page 5Job No:AK-XX-0900797980 Well Name:SP08-N7L1 Survey Report WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V7.4.20 Page 6Job No:AK-XX-0900797980 Well Name:SP08-N7L1 Survey Report