Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-082
STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________PRUDHOE BAY UNIT 14-32A JBR 11/25/2024 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:2 Use 2' x 2-3/8" x 2" Multi joint. FP on Kill HCR valve B5 Cycle and passed. FP on annular had to replace the annular bag passed. Fought a leaking swab valve most of the test. Acummulator bottles 8 with precharge avg of 963psi Test Results TEST DATA Rig Rep:Coyne/TurcotteOperator:Hilcorp North Slope, LLC Operator Rep:Tom Kavanagh/Wade Willia Rig Owner/Rig No.:Nabors CDR3AC PTD#:2170820 DATE:9/28/2024 Type Operation:WRKOV Annular: 250/3500Type Test:INIT Valves: 250/3500 Rams: 250/3500 Test Pressures:Inspection No:bopKPS240928111624 Inspector Kam StJohn Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 16 MASP: 2387 Sundry No: 324-316 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 0 NA Lower Kelly 0 NA Ball Type 2 P Inside BOP 0 NA FSV Misc 0 NA 12 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 1 2"P Annular Preventer 1 7-1/16 FP #1 Rams 1 Blind/Shears P #2 Rams 1 2" Pipe slips P #3 Rams 1 2-3/8" BHA p P #4 Rams 1 2" Pipe slips P #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 2-1/16 P HCR Valves 2 2-1/16 FP Kill Line Valves 1 2-1/16 P Check Valve 0 NA BOP Misc 0 NA System Pressure P3000 Pressure After Closure P2225 200 PSI Attained P21 Full Pressure Attained P52 Blind Switch Covers:PAll Stations Bottle precharge P Nitgn Btls# &psi (avg)P4 @ 1900 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 1 P Annular Preventer P12 #1 Rams P3 #2 Rams P3 #3 Rams P3 #4 Rams P5 #5 Rams NA0 #6 Rams NA0 HCR Choke P1 HCR Kill P1 9 9 9 9999 9 9 9 9 9 FP on Kill HCR FP on annular FP FP 10165, 10350, 10355, 12205 July Drilling Manager 05/29/24 Monty M Myers By Grace Christianson at 3:22 pm, May 29, 2024 DSR-5/29/24MGR05JUN24 324-316 SFD SFD * BOPE test to 3500 psi. Annular to 2500 psi. * Variance to 20 AAC 25.112 (i) approved for alternate plug placement with fully cemented liner on upcoming sidetrack. SFD SFD 5/30/2024 10-407 *&:JLC 6/6/2024 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.06.07 17:10:42 -05'00'06/07/24 RBDMS JSB 061124 To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz Drilling Engineer Date: May 29, 2024 Re: 14-32A Sundry Request Sundry approval is requested to set a whipstock and mill a window in the 14-32A wellbore as part of the drilling and completion of the proposed 14-32B CTD lateral. Proposed plan: See 14-32A Sundry request for complete pre-rig details - Prior to drilling activities, Slickline will drift for a whipstock and dummy the GLVs, service coil will mill up the 3-1/4" CIBP at 10165', E-line will set the 3-1/4" packer whipstock, and then service coil will mill the 2.74" window if a service unit is available. A coil tubing drilling sidetrack will be drilled with the Nabors CDR3 rig. The rig will move in, test BOPE and kill the well. I f not done pre-rig, CDR will mill a single string 2.74" window + 10' of formation will be milled. The well will kick off drilling in Ivishak Zone 4 and drill an S-shaped well through Zones 2, 3, and 4 to TD. The proposed sidetrack will be completed with a 2-3/8” 13Cr solid liner, cemented in place and selectively perforated post rig. This completion will target isolating and abandoning the parent Ivishak perfs. This Sundry covers plugging the existing perforations via the liner cement job or liner top packer, if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start in July 2024) 1. Slickline :ƵŵŵLJ'>sƐĂŶĚƌŝŌĨŽƌtŚŝƉƐƚŽĐŬ 2. Coil : Mill 3-1/4" CIBP at 10165' MD 3. E-Line : Set 3-1/4” Packer Whipstock – 10,285’ @ 45° ROHS 4. Coil : Mill 2.74" Window (if window not possible, mill with rig) 5. Valve Shop : Pre-CTD Tree Work 6.KƉĞƌĂƟŽŶƐ: Remove wellhouse and level pad. Rig Work: (Estimated to start in October 2024) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,387psi). 2. Mill 2.74” Window (only if not done pre-rig) 3.ƌŝůůďƵŝůĚƐĞĐƟŽŶ͗ϯ͘ϮϱΗK,͕~170' (35 deg DLS planned). 4.ƌŝůůƉƌŽĚƵĐƟŽŶůĂƚĞƌĂů͗ϯ͘ϮϱΗK,͕ΕϮϬϱϭΖ;ϭϮĚĞŐ>^ƉůĂŶŶĞĚͿ͘ 5. Run 2-3/8” 13Cr liner to TD 6. Pump primary cement job: 22 bbls, 15.3 ppg Class G, TOC at TOL*. 7. Freeze protect well to a min 2,200' TVD. 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Slickline : Set LTP* (if necessary). Set live GLVs. 3. Service Coil : Post rig perforate (~30’), CBL and RPM. PTD 224-XXX Sundry covers plugging the existing perforations Sundry 324-316 The sundry and permit to drill will be posted in the Operations Cabin of the unit during the window milling operation. Window Milling Fluids Program: x A min EMW of 8.4 ppg KCL (~595 psi over-balance). KCl will be used as the primary working fluid and viscous gel sweeps will be used as necessary to keep the hole clean. x The well will be freeze protected with a non-freezable fluid (typically a 60/40 methanol/water mixture) prior to service coil’s departure. x Additionally, all BHA’s will be lubricated and there is no plan to “open hole” a BHA. Disposal: x All Class l & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3. x Fluids >1% hydrocarbons or flammables must go to Pad 3. x Fluids >15% solids by volume must go to GNI. Hole Size: x The window and 10’ of formation will be drilled with a 2.74” OD mill. Well Control: x BOP diagram is attached. x AOGCC will be given at least 24-hour notice prior to performing a BOPE function pressure test so that a representative of the commission can witness the test. x Pipe rams, blind rams, CT pack off, and choke manifold will be pressure tested to 250 psi and at least 3,500 psi. x BOPE test results will be recorded in our daily reporting system (Alaska Wells Group Reporting System) and will provide the results to the commission in an approved format within five days of test completion. x BOPE tests will be performed upon arrival (prior to first entry into the well) and at 7 days intervals thereafter. x 10 AAC 25.036 c.4.C requires that a BOPE assembly must include “a firewall to shield accumulators and primary controls”. A variance is requested based on the result of the joint hazop with the AOGCC. For our operation, the primary controls for the BOPE are located in the Operations Cabin of the Coiled Tubing Unit, and the accumulators are located on the backside of the Operations Cabin (opposite side from the well). These are approximately 70' from the well. Hazards: x DS 14 is a H2S pad. The last H2S reading on 14-32A: 18 ppm on 08/24/2021. x Max H2S recorded on DS: 140 ppm. Reservoir Pressure: x The estimated reservoir pressure is expected to be 3,267 psi at 8,800 TVD. (7.1 ppg equivalent). x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,387psi (from estimated reservoir pressure). Ryan Ciolkosz CC: Well File Drilling Engineer Joe Lastufka 907-244-4357 DS 14 is a H2S pad Well Date Quick Test Sub to Otis Top of 7" Otis Top of Annular C L Annular Bottom Annular CL Blind/Shears CL 2.0" Pipe / Slips B3 B4 B1 B2 Choke Line CL 2-3/8" Pipe / Slip CL 2.0" Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR3-AC BOP Schematic CDR3 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2.0" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2.0" Pipe/Slips 2-3/8" Pipe / Slip HF neceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 9450' - 4.375" BKR C2 SLV, ID=4.00" 9460' - 3.7" DPY SLV, ID=3.00" 9470' - 3-1/2" x 2-3/8" XO 10,285' - 3-1/4" PKR WS 12,506' - 2-3/8 LNR 4.7# HDY511 ID=1.995 B Sundry Application Well Name______________________________ (PTD _________; Sundry _________) Plug for Re-drill Well Workflow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of "Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on the Form 10-403. Geologist 2 If the “Abandon” box is checked in Box 15 (Well Status after proposed work) the initial reviewer will cross out that checkbox and instead, check the "Suspended" box and initial those changes. Geologist The drilling engineer will serve as quality control for steps 1 and 2. Petroleum Engineer (QC) 3 When the RA2 receives a Form 10-403 with a check in the "Plug for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." Research Analyst 2 4 When the RA2 receives Form 10-407, they will check the History tab in RBDMS for the IPBRD code. If IPBRD is present and there is no evidence that a subsequent re-drill has been completed, the RA2 will assign a status of SUSPENDED to the well bore in RBDMS. The RA2 will update the status on the 10-407 form to SUSPENDED, and date and initial this change. If the RA2 does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. Research Analyst 2 5 When the Form 10-407 for the redrill is received, the RA2 will change the original well's status from SUSPENDED to ABANDONED. Research Analyst 2 6 The first week of every January and July, the RA2 and a Geologist or Reservoir Engineer will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all Plug for Redrill sundried wells have been updated to reflect current status. At this same time, they will also review the list of suspended wells for accuracy and assign expiration dates as needed. Research Analyst 2 Geologist or Reservoir Engineer 217-082 SFD 5/30/2024 SFD 5/30/2024 324-316 PRUDHOE BAY UNIT 14-32A 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 14-32A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-082 50-029-20999-01-00 12393 Conductor Surface Intermediate Production Liner 8886 2463 10061 467 748 2902 10165 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 8662 29 - 2493 27 - 10088 9758 - 10225 9477 - 10225 9476 - 12378 29 -2493 27 - 8593 8299 - 8717 8059 - 8717 8059 - 8888 None 2670 4760 7020 7500 10530 10165, 10350, 10355, 12205 5380 6870 8160 8430 10160 10105 - 12280 5-1/2" 17# 13cr85 25 - 9487 8608 - 8905 Structural 80 20" 30 - 110 30- 110 1490 470 5-1/2" HES TNT PACKER 9288 9288 7905 Bo York Sr. Area Operations Manager Ryan Thompson Ryan.Thompson@hilcorp.com 907.564.5280 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028312 No SSSV Installed 25 - 8068 7905 N/A N/A 508 24 58794 9812 88 56 600 340 1017 271 N/A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2021 Submit Within 30 days or Operations Sr Res Eng: By Meredith Guhl at 11:15 am, Dec 10, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.12.10 10:15:52 -09'00' Bo York MGR05FEB2022 RBDMS HEW 12/13/2021 DSR-12/10/21SFD 12/15/2021 ACTIVITY DATE SUMMARY 11/16/2021 T/I/O = 2420/510/220. Temp = SI. T FL (eline). No AL. T FL @ 10180' (top set of perfs). SV, WV, SSV = C. MV = O. IA, OA = OTG. 04:00 11/16/2021 T/I/O=2350/500/200 Load tbg for E-line ( Perforating ) Pump 275 bbls 100* crude down tbg. FWHPs=100/500/200 11/17/2021 T/I/O=236/507/219 Assist E-Line (stuck in hole) Pump 8 bbls cude down tbg Final WHP's 324/495/213 IA.OA=OTG E-line on well at departure 11/17/2021 T/I/O = 310/510/220. Temp = SI. T FL (eline). No AL. T FL @ surface. SV, WV, SSV = C. MV = O. IA, OA = OTG. 04:30 11/17/2021 ***WELL SHUT IN UPON ARRIVAL*** RUN 1: SET 3-1/4" NS SPECIAL CLEARANCE PLUG 10165.0', CCL TO ME = 13.6', CCL STOP DEPTH = 10151.4' RUN 2: RIH W/ 2-1/2" GEO CONNEX CHARGES AND PERFORATE INTERVAL: 10105' - 10136', ***Temporarily detained after perforating*** ***JOB COMPLETE*** Daily Report of Well Operations PBU 14-32A PERFORATE INTERVAL: 10105' - 10136', Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:217-082 6.50-029-20999-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12393 12373 8889 9288 None 10350/10355/1220 7905 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 30 - 110 30 - 110 1490 470 Surface 2463 13-3/8" 31 - 2493 30 - 2493 5380 2670 Intermediate 10061 9-5/8" 27 - 10088 27 - 8593 6870 4760 Liner 467 7" 9758 - 10225 8299 - 8717 8160 7020 Liner 748 4-1/2" 9477 - 10225 8059 - 8717 9020 8540 Perforation Depth: Measured depth: 10185 - 12280 feet True vertical depth:8681 - 8905 feet Tubing (size, grade, measured and true vertical depth)5-1/2" 17# 13Cr85 25 - 9487 25 - 8068 9288 7905Packers and SSSV (type, measured and true vertical depth) 5-1/2" HES TNT PACKER Liner 2917 3-1/2" x 3-1/4" x 2-7/8" 9476 - 12378 8059 - 8888 10570 11160 12. Stimulation or cement squeeze summary: Intervals treated (measured): Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Ryan Thompson ryan.thompson@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907)564-4535 Treatment descriptions including volumes used and final pressure: 13. Sr Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8886 Sundry Number or N/A if C.O. Exempt: N/A Junk Packer Printed and Electronic Fracture Stimulation Data 5 Operations shutdown Change Approved Program Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028312 PBU 14-32A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 46 1685 39 470 269 723 59504 1 582 1031 By Samantha Carlisle at 1:57 pm, Sep 09, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.09.09 10:09:53 -08'00' Bo York DSR-9/9/21 RBDMS HEW 9/10/2021 MGR14OCT2021 ACTIVITYDATE SUMMARY 8/22/2021 ***WELL S/I ON ARRIVAL***(adperf) RIH W/ 20' X 2.5" GEO RAZOR PERF GUN. DEVIATE DUE TO DOG LEG SEVERITY @ 10258', SHALLOW OF PERF INTERVAL TO SHOOT. REVIEW WITH GEO & PERFORATE INTERVAL 10235' - 10255'. CCL TO TS=7.7', CCL STOP DEPTH=10227.3'. HAD TO WORK CABLE AFTER SHOOTING TO GET MOVING AFTER FIRING. ***JOB COMPLETE / TURN OVER TO DSO TO POP*** Daily Report of Well Operations PBU 14-32A Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:217-082 6.50-029-20999-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12393 10350 8813 9288 none 7905 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 31 - 111 31-111 1490 470 Surface 2463 13-3/8" 30 - 2493 30 - 2493 5380 2670 Intermediate 10061 9-5/8" 27 - 10088 27 - 8593 6870 4760 Liner 467 7" 9758 - 10225 8299 - 8717 8160 7020 Liner 748 4-1/2" 9477 - 10225 8059 - 8717 9020 8540 Perforation Depth: Measured depth: 10185 - 12280 feet True vertical depth:8681 - 8905 feet Tubing (size, grade, measured and true vertical depth)5-1/2" 17# 13Cr85 25 - 9487 25 - 8068 9288 7905Packers and SSSV (type, measured and true vertical depth) 5-1/2" HES TNT PACKER Liner 2917 9476 - 12393 8059 - 8886 10570 11160 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 89619733187 129511562 25 20166 162 314 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Ryan Thompson Ryan.Thompson@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564-5280 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory 5 Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8886 Sundry Number or N/A if C.O. Exempt: n/a No SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 Operations shutdown Change Approved Program Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028312 PBU 14-32A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 3-1/2" x 3-1/4" x 2-7/8' 10350 , 10355 , 12205 By Samantha Carlisle at 12:56 pm, Jun 14, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.06.14 12:11:20 -08'00' Bo York SFD 6/18/2021DSR-6/14/21MGR30JUL2021 RBDMS HEW 6/14/2021 ACTIVITYDATE SUMMARY 5/14/2021 ***JOB CONTINUED FROM 5-13-2021, WELL S/I ON ARRIVAL*** SET NORTHERN SOLUTIONS 2.281" EXTRA RANGE CIBP AT 10355'. LOST APPROXIMATELY 250# ON THE SET. SLACK OFF TO CONFIRM SET. PERFORATE 10185'-10216' WITH 31'x2.5" GEO DYNAMICS RAZOR, 6 SPF, 60 DEG PHASING ***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED*** 5/23/2021 *** ARRIVE ON LOCATION*** DRIFT & TAG CIBP @ 10355' MD FOR DEPTH CORRECTION. TAG DEPTH @ 10350' SLM. ***CONT. 5/24/21*** 5/24/2021 ***WSR CONTINUED FROM 5/23/21***(cibp) DRIFT TO CIBP @ 10350' SLM./10355' MD SET NS CIBP @ 10345' SLM/10350' MD W/ DPU ***JOB COMPLETE , WELL S/ION DEPARTURE*** 5/31/2021 T/I/O= 1500/1600/150 TFS Unit # 1 (Injectivity Test) Loaded TBG with 2 bbls 50/50 followed by 220 bbls crude. Established INJ. of 5 bpm @ 300 psi, Pumped 26 bbls crude to Establish INJ test. DSO notified of well status upon departure. Valve position= WV, SV, SSV= Open, IAC, OAC= OTG. MV= open FWHP= 0/1300/250 Daily Report of Well Operations PBU 14-32A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 7 %, 1. Operations Performed Abandon ❑ Plug Perforations [I Fracture Stimulate ❑ Pull Tubing ❑ Operakon;sllytl�1F}h-— Abandon Suspend ❑ Perforate m Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Reenter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ® Exploratory ❑ 5. Permit to Drill Number. 217-082 3. Address: P.O. Box 196612Anchorage, AK 99519-0612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20999-01-00 7. Property Designation (Lease Number): ADL 028312 8. Well Name and Number: PBU 14-32A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 12393 feet Plugs measured 12205 feet true vertical 8886 feet Junk measured None feet Effective Depth: measured 12205 feet Packer measured 9288 feet true vertical 8920 feet Packer true vertical 7905 feet Casing: Length: Size: MD: TVD: Buret: Collapse: Conductor 80 20' 31 - 111 31-111 1490 470 Surface 2463 13-3/8" 30-2493 30-2493 5380 2670 Intermediate 10061 9-5/8" 27-10088 27-8593 6870 4760 Liner 467 7' 9758-10225 8299-8717 8160 7020 Liner 748 4-1/2" 9477-10225 8059-8717 9020 8540 Liner 2917 3-1/2" x 3-1/4" x 2-7/8" 9476-12393 8059-8886 Perforation Depth: Measured depth: 11380 - 12280 feet True vertical depth: 8923-8905 feet Tubing (size, grade, measured and true vertical depth) 5-1/2" 17# 13Cr85 25-9487 25-8068 Packers and SSSV (type, measured and 5-1/2' HES TNT PACKER 9288 7905 true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and anal pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 22 4904 163 21 248 Subsequent to operation: 69 3998 2788 18 261 14.Attachments: (reuiree per2p Mc25.07025071, a 25.2M) 15. Well Clan after work: Daily Report of Well Operations Iz Exploratory ❑ Development M Service ❑ Stretigrephic ❑ 16. Well Status after work: Oil IIZ Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Vohra, Prachi Contact Name: Vohra, Prachi Authorized Title: Production Engr Contact Email: Prachi.Vohra(dlbp.com Authorized Signature: yla'ri Date: I 1 -/ n Contact Phone: +1 9075644677 Form 10-404 Revised 04/2017 � I �p/ o RBDM `tY or / DEL 1 / 'Ulu �( `( Submit Original Only a/ T/1/0=2400/1800/300 Temp=Sl Thaw Ice plug (PERFORATING) Pumped 10 bbls 11/15/2018 60/40 meth and 43 bbls crude down Tbg. Tbg locked up. ***Job Cont to 11-16-2018 ***Job Cont from 11-15-2018 WSR*** Pumped 130 bbls crude down IA at rate and 116 bbls 180* crude down IA. IA still at talmuch pressure to continue down IA. Freeze protect FL w/ 3 bbls 60/40 meth and 99 bbls crude. Pressured up FL to 1500 psi. DSO notified of well status per LRS departure. FWHP's=500/500/700 SV,WV,SSV=C MV=O IA,OA=OTG ***Tags hung on IA and Wing 11/16/2018 ***AFE sign hung on win CTU#8 1.75" CT Job Scope: Ice Plug Removal / Depth Log /Adperf MIRU CTU. MU & Rih w/ 2.25" DJN. Tag at 3365'. Jet what appeared to be hydrates from 3365' to 3500'. Continue to drift down to 5530'. Did not see any changes in Whp jetting though hydrates. Pooh. MU & RIH w/ 2-3/8" PDS GR/CCL Logging Carrier and 2.75" JSN. Circulate safelube while Rih. Drift down to 11600'. Log from 11600'- 9100'. Flagged pipe at 11343.77'. Pooh. 11/20/2018 ***In Progress*** CTU#8 1.75" CT Job Scope: Ice Plug Removal / Depth Log / Adperf MIRU CTU. MU & Rih w/ 2.25" DJN. Tag at 3365'. Jet what appeared to be hydrates from 3365' to 3500'. Continue to drift down to 5530'. Did not see any changes in Whp jetting though hydrates. Pooh. MU & RIH w/ 2-3/8" PDS GR/CCL Logging Carrier and 2.75" JSN. Circulate safelube while Rih. Drift down to 11600'. Log from 11600'-9100'. Flagged pipe at 11343.77'. Pooh. Download data, (-16.5' correction). MU 2.5" x20' SLB 2506 PJ HMX perf gun. RIH to flag, correct depth. Position gun at shot depth. Perforate 11380'-11400'. 11/20/2018 Pooh. CTU#8 1.75" CT Job Scope: Remove Iceplug, Perforate MIRU CTU. MU & Rih w/ 2.25" DJN. 11/20/2018 ***In progress*** CTU#8 1.75" CT Job Scope: Ice Plug Removal / Depth Log /Adperf Pooh with pert gun. LD gun. Shots fired, ball recovered. Freeze protect well w/ 58 bbls of 60/40 methanol. Trim 65' of pipe. Change packoffs/chain inspection. RDMOL. 11/21/2018 ***Job Complete*** TREE= 3-1/2" LNR, 9.3#, 13CR-85 STL, .0087 bpf, D = 2.992" WELLHEAD = GRAY GEN3 ACTUATOR = STS OKB. ELEV = b -S BE ELEV = 4-12" PKR WFMPSTOCK (06/26/17) 10226' KOP= 3200' Max Angle = 102' @ 12290' DeWmMD= 11196' natumTVn= RRW—,S 91.5#, H-40, D= 19.124" D = 12.347" 11 2493' Minimum ID = 2.377" @ 12345' 33/16" X 2-7/8" XO TOP OF 3-12" X 3-1/4• X 2-7/1 DF 9-5/6• X 7• TIEBACK LNR D= 5-1/7 TBG, 17#, 13CR-85 VAM 1 .0232 bpf, D = 4.892 PERFORATION SLMAARY 3-1/2" LNR, 9.3#, 13CR-85 STL, .0087 bpf, D = 2.992" 9580' Note: Refer to Production DB for historical perf data 9-5/8" X 7" LHR HGR w / TEBACK. D = 6.84" 9768' STS 9-5/8" CSG, 47#, L-80 BTC XO TO 50095 9996' Opn/Sgz 9-518" CSG, 47#, SOO-95 BTC, D = 8.681" 10088' 4-12" PKR WFMPSTOCK (06/26/17) 10226' 2-12" 4-12" SCAB LNR, 12.6#, 13CR-85 VAM TOP, .0152 bpf, D = 3.958" -10221 O 7• LNR 29#, N-80 BT & G .0371 bpf, D = 6.184" PERFORATION SLMAARY REF LOG: BKR RPM ON 07/31/17 ANGLEATTOPPERF: 72' @ 11380' Note: Refer to Production DB for historical perf data SIZE STS INTERVAL Opn/Sgz SHOT SOZ 2-12" 6 11380 - 11400 O 1120118 RK 2' 6 12025- 12050 O 08/01/17 37 2-3/8" 5 12025 - 12050 O 0923/17 4 2-12' 6 12160 - 12165 O 08110/18 RK 2' 6 12265 - 12280 C 07/31/17 46 2-3/8" 5 12265- 12280 C 0922117 2 14-32A SAFETY NOTES: CHROME TBG & LNR *WELL ANGLE > —70• @ 10413" MAX 1X -S: 39.8° @ 10562. I,TUF2207' 81/2" FES X NP, D = 4.562" 3-1/4" LNR 6.6#, 13CR-85 TCI 1, I 12345' .0079 bpf, D = 2.85" PBTO 12373' L -BO STL, .0058 bpf, D = 2.441' 12378' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3499 3485 18 MMG DOME RK 16 04/03/17 5 5625 5200 37 MMG SO RK 20 04/03/17 4 7014 6288 43 MMG D84Y RK 0 0620/15 3 7743 6805 46 MMG OMY RK 0 0820/15 2 8755 7503 44 Me1G DMI RK 0 06/20/15 1 9157 7802 39 MMG DMY w 0 08/20115 1 9269' 1 9476' I-14.375• BKR C2 SLV, D = 4.00- 9477' H9-5/8" X 7' BKR 2RH PKR w /TRACK MLLOUT WINDOW (14-32A) 10225'- 10235' 13-1/4" BKR CBP (08110/18) I DATE REV BY COAMiBJTS D = 6.180" 9481' 3.70" O�LOY MBVT SLELV E D = 3.00• 9487 S1/2•VYLEG, D=4.992• 949T 9-5/6" X 7• BKR FLEX LOCK FGR E= 9 8607' 7• X 4-12• XO, D - 3.920' 8680' 3-12' x 3-3/16• xo, D - 2.796" MLLOUT WINDOW (14-32A) 10225'- 10235' 13-1/4" BKR CBP (08110/18) I DATE REV BY COAMiBJTS DATE REV BY COMM34M 091011&3 PKR 176 INITIAL COMPLETION 09/12/17 JT/.Mu) FMLODEAPPROVAL 08124!15 614 RYPO 09/18/17 jmjhc PULL® IUD w /SHEAROUT SUB 0728117 WCDR2 CTO SIDETRACK (14-32A) 09/27117 ATO/J RE;OZFS (09122-23117) 08/01/17 AV ORLG DPAFr OORRBoTl N S; 08/13/18 MSS/J SET CBP& ADPERFS (08110118) 08101/17 OWIJAU INTIAL PERFS 11/23118 TFAIJK ADPEiFS(11120/18) 09/06/17 BSE/JM[) SET UYSHEAROLIT PLUG (911117) PRUCHOE BAY LNT WELL: 14-32A PERMIT No: 217-082 API No: 50.029-20999-01 T10N, R14F 40' FSL & 1297 F73 BP Ekploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 11/7/2017 Permit to Drill 2170820 Well Name/No. PRUDHOE BAY UNIT 14-32A Operator SP EXPLORATION (ALASKA) INC. API No. 50-029-20999-01-00 MD 12393 TVD 8886 Completion Date 8/1/2017 Completion Status 1-0I1 Current Status 1-0I1- UIC No REQUIRED INFORMATION Mud Log No f / Samples No / 1/ Directional Survey Yes Z/ DATA INFORMATION Types Electric or Other Logs Run: MWD/GR/RES, GR/CCL/RPM (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 28470 Digital Data 9292 12393 8/7/2017 Electronic Data Set, Filename: 14- 32A LWD_FINAL _FIELD_COMPOSITE_24Jul20 17_BHI _CTK.Ias ED C 28470 Digital Data 8/7/2017 Electronic File: 13008719.pdf , ED C 28470 Digital Data 8/7/2017 Electronic File: Post Run 06_8719.pdf ED C 28470 Digital Data 8/7/2017 Electronic File: USR_13008719.pdf ED C 28470 Digital Data 8/7/2017 Electronic File: 14- 32A GR —Res-24Ju12017_MD_FINAL_FIELD_BH I_CTK.cgm ED C 28470 Digital Data 8/7/2017 Electronic File: 14- 32AGR_ Res— 24Ju12017_TVDSS_FINAL— FIELD' _BHI_CTK.cgm ED C 28470 Digital Data 8/7/2017 Electronic File: 14- 32A_GR_Res_24JUL2017_MD_FINAL_FIELD_B HI_CTK.pdf ED C 28470 Digital Data 8/7/2017 Electronic File: 14- O 32A_GR_Res _24JUL2017_TVDSS_FINAL_FIEL ' \ D_BHI_CTK.pdf ED C 28470 Digital Data 8/7/2017 Electronic File: 14-32A Final Survey Report.pdf ED C 28470 Digital Data 8/7/2017 Electronic File: 14-32A Final Survey Report.txt ED C 28470 Digital Data 8/7/2017 Electronic File: 14-32A Final Surveys TD. 12393.csv ED C 28470 Digital Data 8/7/2017 Electronic File: 14-32A Final Surveys TD - 12393.xlsx ED C 28470 Digital Data 8/7/2017 Electronic File: 14- 32A_25_tapescan_BHI_CTK.txt ' AOGCC Page I of 4 Tuesday, November 7, 2017 DATA SUBMITTAL COMPLIANCE REPORT 1117/2017 Permit to Drill 2170820 Well Name/No. PRUDHOE BAY UNIT 14.32A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20999-01-00 MD 12393 TVD 8886 Completion Date 8/1/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 28470 Digital Data 8/7/2017 Electronic File: 14-32A_5_tapescan_BHI_CTK.txt ED C 28470 Digital Data 8/7/2017 Electronic File: 14-32A_output.tap ' ED C 28470 Digital Data 8/7/2017 Electronic File: 14- 32A_GR _ Res _ 24Jut2017_MD_FINAL_FIELD_BH, I_CTK.tif ED C 28470 Digital Data 8/7/2017 Electronic File: 14- 32A GR_Res_24Ju12017_TVDSS_FINAL_FIELD ' _BHI_CTK.tif Log C 28470 Log Header Scans 0 0 2170820 PRUDHOE BAY UNIT 14-32A LOG HEADERS ED C 28508 Digital Data 10135 12374 8/15/2017 Electronic Data Set, Filename: BP -14- 32AThruBit_Dens-Neu-G R-12372-10277MD-25-. JUL_-17 Main Pass.las ED C 28508 Digital Data 10136 10962 8/15/2017 Electronic Data Set, Filename: BP -14- 32AThruBit_Dens-Neu-GR-12372-10277MD-25- - JUL_-17 Repeat Pass.las ED C 28508 Digital Data 8/15/2017 Electronic File: BP-14-32A_ThruBit_Dens-Neu- - GR-12372-10277MD-25-JUL-17 Main Pass.dlis ED C 28508 Digital Data 8/15/2017 Electronic File: BP -14-32A ThruBit Dens-Neu- GR-12372-10277MD-25-JUL-17 Repeat Pass.dlis ED C 28508 Digital Data 8/15/2017 Electronic File: BP -14-32A ThruBit_Dens-Neu- G R-12372-10277 M O -25J U L 17. Pdf Log C 28508 Log Header Scans 0 0 2170820 PRUDHOE BAY UNIT 14-32A LOG HEADERS ED C 28508 Digital Data 10135 12374 8/15/2017 Electr 'c Data Set, Filename: BP-14- 32A_Thru 't Dens -Neu -GR -12372-10277 D-25- -25- ' -17 JUL7 Main ass.las ED C 28508 Digital Data 10136 10962 8/15/2017 Electronic Data t, Filename: B 14- 32A_ThruBit_Dens- eu-GR-1 72-10277MD-25- ' JUL-17 Repeat Pass. ED C 28508 Digital Data 8/15/2017 Electronic File: BP -14 ThmBit_Dens-Neu- GR-12372-10277 -25-JU 7 Main Pass.dlis ' ED C 28508 Digital Data 8/15/2017 Electronic Fit " P -14-32A Thou it Dens -Neu - GR -12372- 277MD-25-JUL-17 R eat Pass.dlis ' ED C 28508 Digital Data 8/15/2017 Electro c File: BP-14-32A_ThruBit_D s-Neu- GR- 372-10277MD-25JUL17.Pdf - AOGCC Page 2 of 4 Tuesday, November 7, 2017 v�e DATA SUBMITTAL COMPLIANCE REPORT 1117/2017 Permit to Drill 2170820 Well Name/No. PRUDHOE BAY UNIT 14-32A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20999-01-00 MD 12393 TVD 8886 Completion Date 8/1/2017 Completion Status I -OIL Current Status 1 -OIL UIC No ED C 28560 Digital Data 10200 12370 9/7/2017 Electronic Data Set, Filename: 14 32A_MRPM PNC3D_RAW _PASSOIDOWN_31J . -las L2 U017 BI -fl ED C 28560 Digital Data 9400 12372 9/7/2017 Electronic Data Set, Filename: 14- 32A_MRPM_PNC3D_RAW_PASS02UP_31JUL2 017 BHI.las ED C 28560 Digital Data 9/7/2017 Electronic File: 14- 32A_MRPM PNC3D_RAW _PASS01DOWN_31J - UL2017 BFULdlis ED C 28560 Digital Data 9/7/2017 Electronic File: 14- 32A_MRPM_PNC3D_RAW_PASS02UP_31JUL2 . 017 BHI.dlis ED C 28560 Digital Data 9/7/2017 Electronic File: 14- 32A_MRPM_PNC3D_RAW_31JUL2017_BHl.met, a ED C 28560 Digital Data 9/7/2017 Electronic File: 14- 32A_MRPM_PNC3D_RAW_31JUL2017_BHI.PD F Log C 28560 Log Header Scans 0 0 2170820 PRUDHOE BAY UNIT 14-32A LOG HEADERS Well Cores/Samples Information: - Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report 2YINA Production Test Information Geologic Markers/Tops Yr COMPLIANCE HISTORY Completion Date: 8/1/2017 Release Date: 6/1/2017 Directional / Inclination Data V Mechanical Integrity Test Information Y /'® Daily Operations Summary O Mud Logs, Image Files, Digital Data Y 11 I Composite Logs, Image, Data Files O Cuttings Samples Y / O Core Chips Y / NA 1 Core Photographs Y / Laboratory Analyses Y / 0A AOGCC Page 3 44 Tuesday, November 7, 2017 DATA SUBMITTAL COMPLIANCE REPORT 11/712017 Permit to Drill 2170820 Well Name/No. PRUDHOE BAY UNIT 14-32A Operator BP EXPLORATION (ALASKA) INC. MD 12393 TVD 8886 Completion Date 8/1/2017 Completion Status 1-0IL Current Status 1-0IL Description Date Comments Comments: Compliance ReviewedBy: _ V- v API No. 50-029-20999-01-00 UIC No AOGCC Page 4 of 4 Tuesday, November 7, 2017 BA ER PRINT DISTRIBUTION LIST FUGHES a GE company R COMPANY BPExplorationAlask�I11L`F CEIVLU WELL NAME 14-32A SEP 0 7 2017 FIELD Prudhoe Bay Unit CC COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Paul Canizares EMAIL Paul.CanizareSCaDbakerhu0hes.COm STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 60X) PERSON ATTENTION 14 BP North Slope. EOA, PROC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rinks & Barbara Glassmaker 900 E. Beason Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99510 3 Exxon Mobil, Alaska Ann: Lynda M. Yaskell anNor Lisa Boggs 3201 C Street, Suite 505 ,Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 21 7082 28560 ase sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. :rotechnical Data Center, LR2-1 DATA LOGGED ) E. Benson Blvd. IN01 BENDER -horaRe, Alaska 99508 LOG TYPE RPM:PNC3D LOG DATE July 31, 2017 TODAYS DATE August 26, 2017 Revision No Details: Rev. Requested by: --- FIELD / FINAL CD/DVD FINAL PRELIM LOGS (las, cilia, PDF, META, SURVEY I REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 4 lu 4 4 4 '9 0 0 1 0 5 DNR - Division ofOil & Gas *** 0 0 j 0 Attn: James Hyun 550 West 7th Avenue, Suite 802 Anchorage. Alaska 99501 Stamp -confidential' on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, IR2-1 900 E Benson Blvd Anchorage, Alaska 99508 Attn: Dodie Stinson TOTALS FOR THIS PAGE: 0 2 5 0 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM' ON WEL ;OMPLETION OR RECOMPLETION REP. .i AND LOG la. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ ib. Well Class: 20AAC25.105 20AAC 25110 11WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Development 0 Exploratory [IGINJ I Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date 92m2., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 8/1/2017 217-082 ' 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 7/18/2017 50.029.20999-01-00 - 4a. Location of Well (Governmental Section): 8. Date TO Reached: 16. Well Name and Number: 7/24/2017 - PBU 14-32A ' Surface: 40' FSL, 1292' FEL, Sec. 04, T10N, R14E, UM 9 Ref Elevations KB 69.00 17. Field/Pool(s): Top of Productive Interval: 2782' FSL, 2431' FWL, Sec. 03, TION, R14E, UM GL 39.29 - BF 41.49 PRUDHOE BAY, PRUDHOE OIL ' 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth: 3895' FSL. 1948' FWL, Sec. 03, T10N, R14E, UM . 12373'/8889' ADL 028312 - 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 675148 - y- 5940379. Zone - ASP 4 •12393'18886' ' 77-043 TPI: x- 678800 y- 5943208 Zone - ASP 4 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MDfrVD: Total Depth: x- 678288 y- 5944309 Zone - ASP 4 None 1900• (Appy ) 5. Directional or Inclination Survey: Yes m (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) MDrrVD: 10225'/8717' - 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES, GR/CCL/RPM 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FirCEMENTING GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZEAMOUNT RECORD PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H40 31' 111' 31' 111' 30" 1800# Poleset 13-3/8" 72# L -e0 30' 2493' 30' 2493' 17-1/2" 2350 sx Fondu, 400 sx PF'C' 9-5/8" 47# L-easoo % 27' 10088' 27' 8593' 12-1/4" 500 w Class'G', 300 sx PF'C' 7" 29" N-80 9758' 10225' 8298' 8717' 8-1/2" 360 sx Class'G' 4-1/2" 1 12.6# 13cres 9477' 10225' 8059' 8717' Scab liner 184 sx Class'G' 3-1/2"x3-1/4' x2-7/8" 1 9.3#/6.6# /6.5# 13CresrL-80 1 9476'12393' 8059'8886' 4-1/4" 136 sx Class'G' 24. Open to production or injection? Yes ® No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and BoBom; Perforation Size and Number): GRADE DEPTH SET (MD) PACKER SET (MD/TV 5-7/2' 17# 13Cr85 9487' 9288' / 7905' 2" Gun Diameter, 6 spf 12025'-12050' 8950'-8947' - 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12265'-12280' 8908'- 8905' Was hydraulic fracturing used during completion? Yes ❑ No m Per 20 AAC 25.283 (i)(2) attach electronic and printed information COMPLETION RECEIVED ,ATE pI) � /y1 AUG 3 0 2017 V DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protect w/ 58 BbIs Diesel _ VERIFIED AO _, AOGCC 27. PRODUCTION TEST Date First Pmduction: August 6. 2017 Method of Operation (Flowing, gas lift, etc.): Flowing Date of Test: 80/2017 Hours Tested: Production fo I Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas-OII Ratio: q Test Period y 15 2,205 78 85 150,318 Flow Tubing 371 Press Casing Press: 572 Calwlaled 24 Hour Rate �► Oil -Bbl: 88 Gas -MCF: 13,228 Water -Bbl: 470 . Oil Gravity- API(wrrl: 34.9 Form 10407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only RSDMS 41, AUG 3 1 2017 28. CORE DATA j Conventional Corals) Yes ❑ No 9 ` Sidewall Cores Yes ❑ No ® ' If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost -Top Well Tested? Yes ❑ No Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 11200' 8870' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. 42SB - Zone 4B 10460' 8842' CGL -Zone 3 11200' 8870' Base of CGL - Zone 2C 11427' 8937' Zone 3 (Invert) 12250' 8911' Formation at total depth: Zone 3 (From Base) 12250' 8911' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post-Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Tempel, Joshua Authorized Title: Inform and to troller Contact Email: Joshua.Tempel@bp.com Authorized Signature: ale: MOM Contact Phone: INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements in other given spaces on this forth and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-2012300-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the Producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only E= OKB. E LEV = 69' BF E.EV = OP OF 9-5/8' X 7• TEBACK LNR ID = 6.180' 9477 KOP= 3200' Wx Angle = 102' @ 1229U Datum MO= 11196 Datum TVD = 88W SS 13-3/8• CSG, JMD q -AFT 14-32A Minimum ID = 2.377" @ 12345' 3-3/16" X 2-7/8" XO ITOPOF 3-12• X 3-1/4' X 2-7/8. 1. NR 9476' MO OP OF 9-5/8' X 7• TEBACK LNR ID = 6.180' 9477 I DEVI TYPE 5-72' TBG, 17#, 13CR-85 VAM TOP HC, .0232 bpf, D = 4.892 9487- PORT DATE 6 3-12• LNR, 9.3#, 13CR-85 STL, ..0087 bpf, D = 2.992' 9580' 18 MAG DOW RK 9-5/8• X 7' LNR HGR w/ TRACK. D = 6.84' 9768' 04/03117 9-5/8• CSG, 47#, L-80 BTC XO TO S0095 9996' S62s 47#, $00-95 BTG ID= 8.681' 10088' 37 412' PKR WHPSTOCI((0626/17) 1022: 41/2• SCAB LNR 12.6#, 13CR-85 VAM TOP, .0152 bpf, D = 3.958' -1022 20 .NR, 29#, N -BO ST 8 C, .0371 bpf, D = 6.184' -1022 4 PERFORATION SIEFMRY Fid LOG: BKR RF M ON 07/31/17 ANGLE AT TOP PERF: 97° @ 12025' Note: Refer to Production DB for historical pert data SIZE I SPF I INTERVAL I Opn/Sqz I SHOT SQZ 2" 6 112025-120501O 08/01/17 2' 6 12265 - 12280 O 07/31/17 3-1/4• LNR, 6.6#, 13C R-8 .0079 bpf, ID = 2.85• L-80 STL..0058 bpf, D = 2207' GAS LFT MANDRELS ST MO I ND I DEVI TYPE VLV LATCH PORT DATE 6 3499 3485 18 MAG DOW RK 16 04/03117 5 S62s 5200 37 MdC' SO RK 20 04/03/17 4 7014 6298 43 kfYX' DW R( 0 08/20/15 3 DMY RK 0 0820115 2 8755 7503 a4 MNG DFM RK 0 0820115 1 9157 7802 39 F,*AG DW RK 0 0820/15 9268' DATE REV 13Y COMA NTS 09/01/83 PKR 176 INITIAL COMPLETION 8288' 9-5/8' X 5-1/2' HES TNT PKR D = 4.811' 9434' S7/2' HE'S X NP, D=4.56Y 9476' 9477' 4.375• BKR C2 SLV, D = 4.00' 9-5/8• X 7' BKR 2RH PKR w !TIEBACK D = 6.180' 9481' 3.70' DEPLOY MEVT SLEEVE, D=3.00' 9487' syY WLEG D=a.s9� 9497' 9-5/8• X 7• BKR FLEX LOCK HGR D = 6. 9607' I—IV• x a-12• xo. 0 = 3.s2o• � 968-� 3-12' X 3-3/16• XO. D = 2.786' MLLOUT VWIWW (14-32A) 10225' - 10235' DATE REV BY I COWNtS DATE REV 13Y COMA NTS 09/01/83 PKR 176 INITIAL COMPLETION O8/2M15 1.14 RWO 0728117 N-CDR2 CTDSIEIETRACK(14-32A) 08/01/17 JAD DRLGDRAFTCORRECTDKS 08/01/17 OW/JNV MAL PE7FS PRIDHOE BAY ENT WELL: 14-32A PEW N7: 217-082 AR No: 50-02320999-01 SEC 4, T10R R14F-40' FSL 8 1292' FE BP &ploration (Alaska) Printed 8/1112017 10:09:09AM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 1 of 16 Operation Summary Report Common Well Name: 14-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/15/2017 1 End Date: 7/26/2017 X3-018HR-C: (2,814,936.20 ) Project: Prudhoe BaySite: PB DS 14 Rig Name/No.. CDR -2 Spud DateTme: 8/5/1983 12:00:OOAM Rig Release: 7/28/2017 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000829 Active datum: KB Q69.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT Total Depth Phase Desviption of Operators _ _ (h0(usft 7/15/2017 12:00 - 15:30 3.50 RIGU P PRE RIG RELEASED FROM MAINTENANCE AT 1200 - PREPARE FOR MOVE 1— PERFORM PRESPUD WITH VAN CLEVE CREW. LEAVE PRICE PAD AT 15:30 _ 15:30 17:30 2.00 RIGU P ii P --RE"" _ MOVE RIG TO DS14 ARRIVE LOCATION AT 17:30 17:30 - 20:30 3.00 RIGU P PRE PREPARE LOCATION TO MOVE RIG OVER WELL VERIFIED PRESSURESARE BELOW50# I- � I VERIFIED ALL VALVES CLOSED i_ PJSM, PEAK, NABORS, AND WSL- - DISCUSS CHOCK BLOCK USAGE, DISCUSS RADIO COMMUNICATION AND ASSIGN 1 SPOTTERS - AGREE "ALL STOP" WILL BE COMMAND TO j STOP OPS. - MOVE SUB MODULE OVER WELL AND SET DOWN. SET DOWN. TAKE MEASUREMENTS 20:30 - 00:00 3.50 RIGU P PRE TO LINE UP PIT MODULES THROUGH RUTZ_._ RIG ACCEPTANCE AT 20:30 - PJSM, GO OVER PUNCH LIST FOR RIGGING RIG UP FOR OPS. 00:00 - 01:00 1.00 RIGUP PRE - PERFORM PRESPUD WITH COYNE CREW. FINISH RIGGING CELLAR 7/16/2017 PERFORM PASSING LTT BETWEEN MASTER / SWAB TO 3500# 01:00 - 04:00 3.00 RIGU P PRE NIPPLE DOWN TREE CAP. NIPPLE UP MANAGE PRESSURE LINE. HAD TO 04:00 - 05:00 1.00 BOPSUR _ P PRE REPOSITION 90 ON HOSE. NIPPLE UP BOPE STACK FUNCTION BOTH SETS OF BLIND SHEAR RAMS. INSTALL TEST JOINT. TEST FUNCTION ON ALL VALVES DUE TO ALL HYDRAULIC LINES WERE DISCONNECTED DURING MAINTENANCE. 05:00 - 08:00 3.00 RIGU P PRE STAB INJECTOR CIRCULATE COIL OVER TO FRESHWATER TO 08:00 - 11:30 3.50 RIGU N PRE TIGER TANK ATTEMPT TO TEST BORE -TROUBLESHOOT LEAK, ISOLATED TO LEAKING MASTER VALVE -MOBILIZED GREASE CREW AND VERIFY THE VALVE WILL HOLD PRESSURE 11:30 - 21'.30 10.00 BOPSUR P PRE TEST BORE TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH i - TEST WITH CDR2 MULTI JOINT (2-3/8", 3", 3-1/2"JOINTS) TESTANNULARAND VARIABLES WITH BOTH 2-3/8" AND -3-1/7JOINTS - ALL TESTS CHARTED, SEE ATTACHED BOP TEST CHARTS - TEST WITNESS WAIVED BY AOGCC REP LOU LAUBENSTEIN Printed 8/1112017 10:09:09AM *All depths reported in Drillers Depths' North America -ALASKA- BP Operation Summary Report Page 2 of 16 Common Well Name: 14-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/15/2017 End Date: 7/26/2017 X3-018HR-C: (2,814,936.20) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: CDR -2 Spud DateTme: 8/5/1983 12:00:00AM Rig Release: 7/28/2017 Rig Contractor NABORS ALASKA DRILLING INC. BPUOI USA00000829 Active datum: KB (989.00usft (above Mean Sea Level) Dale From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) 2.50 BOPSUR (usft) P PRE PERFORM ACCUMULATOR DRAWDOWN TEST 121:30 - 00:00 PULLTESTJOINT. PRESSURE TEST NEW BACKSIDE LINE TO 42009. NO LEAKS INSTALL BLIND SUB TO TEST IRV /REPLACE _— PACKOFFS. 1.00 BOPSUR 7/17/2017 00:00 - 01:00 P PRE PRESSURE TEST IRV / PACKOFFS TO 30OPSI LOW/ 3500# HIGH FOR 5 MINUTES EACH. BOPSUR 01:00 - 02'.30 1.50 P PRE _PASS PJSM, WITH VALVE CREW/ GREASECREW TORQUE TREE/GREASE SWAB PERFORM TEST ON SWAB VALVE TO 35001 HELD SOLID INSTALL FLOATS IN UQC. N PRE PRESSURE TEST CTC AND UQC TO 3501 UQC BODY LEAKED, SWAP BODY OUT. 02:30 -. 05:00 2.50 BOPSUR STILL LEAKED. LOOKING AT WIRE, BREAK IN INSULATION. BOOT E -LINE AND PUMP FORWARD TO GET ENOUGH E -LINE FOR REHEAD. STAB ON WITH STINGER. PUMP E -LINE FORWARD TO REREAD. 05:00 - 07:30 2.50 BOPSUR P PRE PULLTWC -PJSM WITH ALL PERSONNEL INVOLVE WITH TASK, NABORS RIG CREW AND CH2 VALVE CREW -REVIEWED PRESSURE CROSS CHECK CARD -LEAK TIGHT TEST LUBRICATOR WITH METHANOL TO 3100 PRESS, GOOD TEST -ENGAGE TWC AND PULL WITHOUT ISSUES, 65 PSI ON TUBING AFTER UNSEATING TWC -PURGE LUBRICATOR TO FLOW BACK TANK -RIG DOWN LUBRICATORAND CLEAR THE 07:30 - 09:30 2.00 BOPSUR N PRE EQUIPMENT FROM THE RIG _ INSTALL COIL CONNECTOR, UQC AND FLOATS -PRESSURE TEST TO 30OPSI LOW/ 3500# 09:30 - 1130 j 2.00 SOPSUR P PRE HIGH FOR 5 MINUTES EACH. PASSING TEST DISPLACE COIL Tot% KCLSLICK 11:30 - 12:00 0.50 BOPSUR P PRE -TEST OTS, GOOD TEST SERVICE RIG CHOKE, BOP STACKAND 12:00 - 13:30 1.50 KILLW P 1 PRE ROMEO VALVES RIH WITH BHA#1 NOZZLE FROM SURFACE TO 2000' MO - RATE: 0.57. BPM IN, 0.72 BPM OUT, CIRC PRESSURE: 142 PSI - MUD WEIGHT: 8.4 PPG IN, 0.5-7.04 PPG OUT -VERIFING STRAPS AT FLOW13ACK TANK EVERY 1000'MD Printed 8/11/2017 1a:09.09AM 'All depths reported in Drillers Depths` Printed 8/1112017 10:09:09AM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 3 of 16 Operation Summary Report Common Nall Name: 14-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) I Start Date: 7/15/2017 End Date: 7/26/2017 X3-018HR-Q (2,814,936,20) Project: Prudhoe BaY Site: PB DS 14 Rig Name/No.: CDR -2 I Spud Date/Time: 8/5/1993 12:00 OOAM Rig Release: 7/28/2017 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000829 Active datum: KB @69.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _(hr) (usft) 13_30__-14 3_0 1.00 KILLW P 2,000.00 _ PRE CONDUCTED A -UNANNOUNCED KICK WHILE TRIPPING DRILL -WELL SHUT IN 95 SECONDS -COMPLICATED THE DRILL BY INITIATING AN H2S ALARM AFTER THE WELL JUST GOT SHUT IN. -100% OF PERSONNEL RESPONDED TO THE MUSTERAREA INA TIMELY MANNER, 210 SECONDS AFTER START -CONDUCT THE AAR AFTERWARD CAPTURING THE LESSONS LEARNED. -AFTER THE DRILL VERIFIED LINES OF _ COMMUNICATION WITH NO DEFICIENCIES 1430 - 1700 2.50 KILLW P 10,223.00 PRE RIH WITH BHA #1 NOZZLE FROM 2000'70 10242' MD - RATE: 0.57. BPM IN, 0.72 BPM OUT. CIRC PRESSURE: 142 PSI - MUD WEIGHT: 8.4 PPG IN, 7.04- 8.2 PPG OUT - VERIFING STRAPS AT FLOWBACK TANK EVERY 1000' MD _TAG AT 10,242' UNCORRECTED 17.00 - 2230 5.50 KILLW P 10,223.00 PRE SWAP WELL TO 8.4 PPG 1%SLICK KCL - RATE: 1.5 BPM IN, GASEOUS FLUID BPM OUT - MUD WEIGHT: 8.34 PPG IN, GASEOUS FLUID PPG OUT -BLEW MM DOWN. FOUND DEBRIS. - CIRCULATE 1.5 TIMES WITH 1%KCLAT 5 BPM - SHUT DOWN TO EMPTY TIGER TANK I - FINAL CIRCULATING PRESSURE WITH WELL DISPLACED TO KCL: 602 PSI AT 4.90 BPM 22:30 - 23:30 1.00 KILLW P 10,223.00 PRE SWAP WELLTO9.0 PPG MUD - RATE: 4.3 BPM IN, 4.30 BPM OUT - MUD WEIGHT: 9.08 PPG IN, 8.4 PPG OUT - CIRC PRESSURE: 3800#, SURFACE TO SURFACE. 23:30 - 00:00 0.50 KILLW P 10,223.00 PRE MONITOR WELL FOR 10 MINUTES: STATIC 7/18/2017 00:00 - 02:00 2.00 KILLW P 10,223.00 PRE POOH - MUD WEIGHT: 9.02 PPG IN, 8.95 PPG OUT RATE: 3.47 BPM IN, 2.97 BPM OUT 02:00 - 04:30 1 2.50 KILLW P 10,223.00 PRE MONITOR WELL FOR IO MINUTES AT BHA: STATIC -TAG UP. - INJECTOR OFF: 02:20 - MAKE UP BHA WHILE MAINTENANCE PERFORMED ON REEL 04:30 - 05:00 1 0.50 STWHIP P 10,223.00 WEXIT MU MILLING BHA -PJSM ON MU BHA, ABLE TO PULL BHA ABOVE ALL BOP COMPONENTS -RIH WITH BHA#2 -PRESSURE TEST OTS TO 250 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES -INJECTOR ON: 04:25 Printed 8/1112017 10:09:09AM *All depths reported in Drillers Depths' 7/19/2017 00:00 - 01:30 1.50 STWHIP P 10,260.00 WEXIT CONTINUE POOH WITH WINDOW MILLING BHA. Printed 8/11/2017 10:09:09AM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 4 of 16 Operation Summary Report Common Well Name: 14-32 10,249.5'MD AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/15/2017 End Date: 7/26/2017 X3-018HR-C: (2,814,936.20) Project: Prudhoe Bay Site: PB DS 14 - MUD WEIGHT: 8.96 PPG IN, 8.99 PPG OUT Rig Nam/No.: CDR -2 Spud Date/rime: 8/5/1983 12:00:00AM Rig Release: 7/28/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000829 Active datum: KB @69.00usft (above Mean Sea Levey Date Fran - To Hrs Task 7 Code NPT Total Depth Phase Description of Operators (hr) _- MILLING PARAMETERS. 21:00 - 23:30 2.50 STWHIP P 10,223.00 WEXIT 05:00 - 07:00 2.00 STWHIP P _.(usft)___ 10,223.00 WEXIT RIH HATH MILLING BHA FROM SURFACE TO - RATE: 278PM IN, 2.76 BPM OUT - MUD WEIGHT: 8.96 PPG IN, 8.99 PPG OUT 9000' MD -DWOB: 3.0-4.1 KLBS - RATE:0.45 BPM IN, 0.995 BPM OUT. CIRC - PUMP 10 BBL HI VIS SWEEP AROUND. REAM WINDOW PRESSUREA092 PSI - PERFORM REAMING PASS UP THEN DOWN AT 1 FT/MIN. - VERY SLIGHT MOTOR WORK SEEN AT - MUD WEIGHT: 8.9 PPG IN, 8.9 PPG OUT 07:00 - 0730 0.50 STWHIP P 10,223.00 WEXIT CONDUCT H2S/ EVACUATION DRILL BETWEEN 4-1/2" AND 7" CASING. -SECURED WELL IN 55 SECONDS - DO ANOTHER PASS, SIMILAR SLIGHT MOTOR WORK WITH NO DWOB. -FULL MUSTER IN 240 SECONDS AFTER THE - DRY DRIFT IS CLEAN, NOTHING SEEN ON DWOB. START OF THE ANNOUNCEMENT 107:30 - 0800 0.50 STWHIP P 10,22300 WEXIT RIH WITH MILLING BHA FROM 9000'MD TO - BOTTOMS UP SAMPLE IS 40% FORMATION. 23:30 - 00:00 PINCH POINT AT 10,238' MD STWHIPP110,223.00 WEXIT _ POOH. - RATE:0.58 BPM IN, 1.02 BPM OUT. CIRC - MONITOR WELL FOR 10 MINUTES AT PRESSUREA372 PSI STATIC _ - MUD WEIGHT: 8.9 PPG IN, 8.9 PPG OUT 08:00 - 18:00 10.00 STWHIP P 10,223.00 WEXIT MILL 3.80"WINDOW IN 4.5"X7"CASING/LINER OPEN EDC, POH FROM 10,200' PER BAKER REP FROM 10238' MD TO - CIRC PRESSURE: 3,230 PSI 10,247.7' MD - RATE: 2.72 BPM IN, 2.72 BPM OUT - MUD WEIGHT: 8.9PPG IN, 8.9 PPG OUT - DWOB: 2.0-3.6 KLBS CIRC PRESSURE: 3115 PSI 18:00 - 21:00 3.00 STWHIP P 10,223.00 WEXIT MILL 3.80"WINDOWIN 4.5"X7"CASING/LINER 7/19/2017 00:00 - 01:30 1.50 STWHIP P 10,260.00 WEXIT CONTINUE POOH WITH WINDOW MILLING BHA. Printed 8/11/2017 10:09:09AM *All depths reported in Drillers Depths' PER BAKER REP FROM 10,247.7' MD TO j 10,249.5'MD I - RATE: 2.77 BPM IN, 2.76 BPM OUT - MUD WEIGHT: 8.96 PPG IN, 8.99 PPG OUT - DWOB: 3.9 - 4.1 KLBS - CIRC PRESSURE: 3220 PSI - CASING EXITAT 10,249.5' BASED ON MILLING PARAMETERS. 21:00 - 23:30 2.50 STWHIP P 10,223.00 WEXIT MILL RATHOLE FROM 10,249.5' TO 10,260'. - RATE: 278PM IN, 2.76 BPM OUT - MUD WEIGHT: 8.96 PPG IN, 8.99 PPG OUT -DWOB: 3.0-4.1 KLBS - CIRC PRESSURE: 3,100 - 3,320 PSI - PUMP 10 BBL HI VIS SWEEP AROUND. REAM WINDOW - PERFORM REAMING PASS UP THEN DOWN AT 1 FT/MIN. - VERY SLIGHT MOTOR WORK SEEN AT 10,247', NOTHING ON DWOB. DEPTH CORRESPONDS TO TRANSITION BETWEEN 4-1/2" AND 7" CASING. - DO ANOTHER PASS, SIMILAR SLIGHT MOTOR WORK WITH NO DWOB. - DRY DRIFT IS CLEAN, NOTHING SEEN ON DWOB. - OPEN EDC, FLAG PIPE AT 10,200' (10,090' EOP) - BOTTOMS UP SAMPLE IS 40% FORMATION. 23:30 - 00:00 0.50 STWHIPP110,223.00 WEXIT _ POOH. - MONITOR WELL FOR 10 MINUTES AT WINDOW WITH DYNAMIC FLOW CHECK: STATIC - MUD WEIGHT: 8.96 PPG IN, 8.98 PPG OUT - RATE: 3.52 BPM IN, 3.01 BPM OUT OPEN EDC, POH FROM 10,200' - CIRC PRESSURE: 3,230 PSI 7/19/2017 00:00 - 01:30 1.50 STWHIP P 10,260.00 WEXIT CONTINUE POOH WITH WINDOW MILLING BHA. Printed 8/11/2017 10:09:09AM *All depths reported in Drillers Depths' STATIC - CLOSE EDC, POWER DOWN - INJECTOR OFF: 01:45 - INSPECT LAST 10 FT OF CT FOR FLAT J SPOTS. 02:00 North America -ALASKA - BP Page 5 of 16 DRILL N Operation Summary Report 1.00 Common Well Name: 14-32 P i AFE No Event Type: RE-ENTER- ONSHORE (RON) I Start Date: 7/152017 End Date: 7/26/2017 X3-018HR-C: (2,814,936.20) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: CDR -2 Spud Date/Time: 8/5A983 12:00:OOAM Rig Release: 7/28/2017 Rig Contractor NABORS ALASKA DRILLING INC. - PRESSURE TEST OTS TO 3,500 PSI HIGH BPUOI: USA00000829 Active datum: KB @89.00usft (above Mean Sea Level) —li Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations hr .� ) (268) _L 01:30 - 02:00 0.50 i STWHIP P .- 10,280.00 WEXIT MONITOR WELL FOR IO MINUTES AT BHA: STATIC - CLOSE EDC, POWER DOWN - INJECTOR OFF: 01:45 - INSPECT LAST 10 FT OF CT FOR FLAT J SPOTS. 02:00 - 03:00 2.50 DRILL N 1.00 DRILL P i 03:00 - 05:00 2.00 DRILL P� 05:00 - 07:00 2.00 DRILL P 07:00 - 07:30 0.50 R P 07:30 - 08:00 j 0.50 DRILL P 08:00 - 10'.30 2.50 DRILL N 3.78" NO-GO. 4.50 DRILL N 10:30 - 15:00 r"Msa nnv2ul 1 10,09:09AM "All depths reported in Drillers Depths* - LID BHA. MILL IS 3.79" NO-GO, REAMER IS 3.78" NO-GO. 1 0280 00 PROD? MAKE UP 4.25" DRILLING BHA #3 - PICK UP 2-7/8" XTREME MOTOR (3.2 DEG AKO) AND 3" COILTRAK TOOLS - MAKE UP 4.25" HCC BICENTER BIT -SURFACE TESTED COILTRACK TOOL. GOOD TEST. - PRESSURE TEST OTS TO 3,500 PSI HIGH FOR 5 MINUTES —li -INJECTOR ON: 02:55 10,260.00 PRODI RIH WITH 4.25' DRILLING BHA 113 - RATE 0.52 BPM IN, 1.01 BPM OUT. CIRC PRESSURE: 1,095 PSI - MUD WEIGHT: 8.94 PPG IN, 8.99 PPG OUT 10,280.00 PROD1 LOG DOWN FOR TIE-IN FROM 10,125" TO 10,205' MD (RA TAG/FORMATIONMEWELRY) DIFFICULT CORRELATING TO GAMMA MARKER, SHOWING A+43 FT CORRECTION, RE -LOG TIE-IN WITH +17' CORRECTION PULLED BACK TO 9300', LOG CCL FROM 9300 709500 10,260.00 PROD1 RIH TOABOVE WHIPSTOCK TAG 10240? BROUGHT PUMP UP TO 2.7 BPM 10,260.00 PROD1 DRILL 4.25" BUILD FROM 10240' MD TO 10,264' MD - FREE SPIN: 3130PSI, 2.7 BPM - RATE: 2.7 BPM IN, 2.7 BPM OUT. CIRC PRESS3100-3350PSI - MUD WEIGHT:8.90 PPG IN, 8.9 PPG OUT, ECO: 10.0 PPG - ROP: 100+ FT/HR, WOB: 0 KLBS NOT SEEING WOB SUSPECT TIE-IN DEPTH OFF 10,260.00 PROD? RE -LOG HIGHER TO CORRELATE TO PDC LOG AND WORK WITH ANCHORAGE RIG TEAM TO GET DEPTH CORRELATION -29 FT CORRECTION RI H 10200 - 10236' THROUGH WINDOW WITH PUMPS OFF 10,260.00 PROD1 __ DRILL4.25" BUILD FROM 10236' MDTO 10,250 MD - FREE SPIN: 3130PSI, 2.7 BPM - RATE: 2.7 BPM IN, 2.7 BPM OUT, CIRC PRESS3100-3350PSI - MUD WEIGHT:8.90 PPG IN, 8.9 PPG OUT, ECD: 10.0 PPG - ROP: -6 FTIHR FT/HR, WOB: 0 KLBS DIFFICULT TO GET BIT STARTED WITHOUT STALLING r"Msa nnv2ul 1 10,09:09AM "All depths reported in Drillers Depths* North America - ALASKA- BP Operation Summary Report Page 6 of 16 Common Well Name: 14-32 Event Type: RE-ENTER- ONSHORE (RON) Project: Prudhoe Bay Start Date: 7/15/1017 End Date: 7/26/2017 Sde:P DDS 14 AFE No X3-018HR-C: (2,814,936.20 ) Rig Name/No.: CDR -2 I Spud Daterrime: 8/5/1983 12:0O:OOAM Rig Release: 7/28/2017 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000828 Active datum: KB Q69.0_0usft (above Mean Sea Level) Date From - To Hm 115:00 Task Code NPT ! Total Depth Phase Description of Operations (h0 (us - 17:30 2.50 GRILL N 10(260.00 PROD? DRILL 4.25'BUILD FROM 10250'MD 7010,250' MD - FREE SPIN: 3140PSI, 2.7 BPM - RATE: 2.7 BPM IN, 2.7 BPM OUT. CIRC PRESS3100 -335OPSI - MUD WEIGHT:8.90 PPG IN, 8.9 PPG OUT, ECD: 10.0 PPG -WOB:0 KLBS PUMP EP MUD LUBE PILL TO IMPROVE WEIGHT TRANSFER TO BIT DIFFICULT TO GET BIT STARTED WITHOUT STALLING. 17.30 - 21:001I 3.50 DRILL N 10,260.00 PROD? PERFORM DYNAMIC FLOW CHECKAT WINDOW GOOD. PULL UP TO 9,395' FOR TIE-IN. NO !, CORRECTION. RIH, LIGHT TAG AT 10,250'. POOH. 21:00 - 22:00t00 DRILL N 10,260.00 PROD? MONITOR WELL FOR 10 MINUTESAT BHA: STATIC - OPEN CT RISER AND INSPECT LAST 50 FT OF PIPE FOR FLAT SPOTS. - ONE FLAT AREA FOUND JUST ABOVE CONNECTOR, WALL THICKNESS IS 0.154". DISCUSS WITH ODE, AGREE ITS OK TO CONTINUE HOWEVER WILL MONITOR THIS SPOT ON FUTURE RUNS. -CLOSE EDC, POWER DOWN - INJECTOR OFF: 21:05 - BIT IS 4-8 WITH ALL SIDE CUTTERS BROKEN. CUTTERS ON THE FRONT OF THE _. NOSE STILL INTACT. 2200 - 23.00 1.00 DRILL N 10,260.00 PROD1 _ MAKE UP 3.8' MILLING BHA#4 - PICK UP 2-7/8" XTREME MOTOR (1.0 DEG AKO) AND 3" COILTRAK TOOLS - MAKE UP D331 PARABOLIC MILLAND STRING REAMER - MILLAND REAMERARE 3.79" NO-GO. - SURFACE TESTED COILTRACK TOOL GOOD TEST. - PRESSURE TEST OTS TO 3,500 PSI HIGH FOR 5 MINUTES .--I— - INJECTOR ON: 22:40 23:00 - 00:00 1.00 DRILL N 10,260.00 PRODI RIH WITH 3.8" MILLING BHA#4 - RATE: 0.43 BPM IN, 0.73 BPM OUT, CIRC PRESSURE: 1,020 PSI — - MUD WEIGHT: 8.92 PPG IN, 8.96 PPG OUT 7/20/2017 00:00 - 01:00 1.00 DRILL N 10,260.00 PR001 CONTINUE RIH WITH BHA#4. enntea 6/11/2017 10:09:09AM *AII depths reported in Drillers Depths' Printed w¢ur r I J:W 09AM 'All depths p reported in Drillers Depths' North America - ALASKA - BP Page 7 of 16 Operation Summary Report Commn Well Name: 14-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/152017 End Date: 7/26/2017 X3-018HR-C: (2,814,936.20) Project: Prudhoe Bay I Site: PB DS 14 Rig Name/No.: CDR -2 Spud DateRme: 8/5/1983 12:00:00AM Rig Release: 7/28/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000829 Active datum: KB @69.00usft(above Mean Sea Level) - Data From - To Hrs Task Code NPT Total Depth Phase Description of Operations ___ (hr) (usft) 101:00 - 06:00 5.00 _ DRILL N 10,260.00 PROD1 LOG TIE-IN FROM 9,395'. CORRECT -13'. RIH TO 10,220' AND CLOSE EDC. REAM DOWN 1 FT/MIN FROM 10,220' WITH OL TF AT 2.50 BPM / 2,830 PSI. ABOUT 100 PSI MOTOR WORK SEEN AT 10,232', NOTHING ON DWOB. TAG BOTTOM AT 10,250' AND STALL, PICKUP IS CLEAN. CONDUCTA TOTAL OF 4 UP (AT 15L AND 15R TF) AND 4 DOWN PASSES (AT OL TF) AT 1 FT/MIN FROM 10,220'-10,250'. NOTHING SEEN ON ANY OF THE UP PASSES. SLIGHT MOTOR WORK SEEN ON THE DOWN - PASSES AROUND 10,237'. 06:00 - 08:00 2.00 DRILL N 10,260.00 _ PROD1 START DRILLING FORMATION -TAG BOTTOM EASYAT LESS THE 0.5 WOB -PUMP RATE 2.5 1N AND 2.5 OUT 1 1 -8.9 PPG IN AND OUT -AFTER V INCREASE WOB DRILL TO 10,260 WITH 3K Wr08 AND 150 PSI MOTOR WORK -BACK REAM ONE TIME WITHOUT ISSUES 08.00 - 1030 2.50 DRILL N 10,260.00 PROD1 POH -DYNAMIC FLOW CHECK, NO FLOW 8.9 PPG IN / OUT -CORRECT DISPLACEMENT -PAINT FLAG AT 10, 100' 1030 - 11:30 1.00 DRILL N 10,26000 PROD1 SET BACK BHA -FLOW CHECK WELLAT 200', STATIC -CONDUCT PJSM WITH NABORS RIG TEAM, BAKER DO AND MWD -INSPECT COIL, FLAT AREA 8 FEET FROM CONNECTOR - 0.134"WALL THICKNESS -BREAK OFF UPPER QUICKAT 10:50 -UNABLE TO BREAK MILLS OFF, LAID DOWN — BHA DUE TO CUTTING 35' OF COIL 11:30 - 14:00 2.50 DRILL P 10,260.00 PROD? _ CUT 35' OF CTAND REMOVE FROM RIG FLOOR. 14:00 - 15:00 1.00 DRILL P 10,280.00 PRODt PJSM THEN INSTALL CT CONNECTOR. 10,260.00 PROD? PULL TEST TO 50K, GOOD. PJSM AND TEST FLOATS AND UQC, CTC TO 15:00 - 17:00 2.00 DRILL P 3,500 PSI, GOOD. 17:00 - 19:00 2.00 DRILL P _ 10,260.00 PROD1 PJSM AND RETORQUE BOLTS ON INJECTOR CART BEAMS, PERFORM LO/TO ON TOP DRIVE HYDRAULICS AND CHANGE OUT HYDRAULIC 10,260.00 PROD1 HOSE ON TOP DRIVE. MAKE UP 4.25° DRILLING BHA #5 19:00 - 20:00 1.00 DRILL P - PICK UP 2-7/8" XTREME MOTOR (3.2 DEG AKO) AND 3" COILTRAK TOOLS - MAKE UP 4.25' HCC BICENTER BIT 1 - - SURFACE TESTED COILTRACK TOOL. GOOD TEST. j - PRESSURE TEST QTS TO 3,500 PSI HIGH FOR 5 MINUTES -INJECTOR ON: 19:25 Printed w¢ur r I J:W 09AM 'All depths p reported in Drillers Depths' North America - ALASKA- BP Operation Summary Report Common Well Name: 14-32 Event Type: RE-ENTER- ONSHORE (RON) Start Data. 7/15/2017 End Date: 7/26/2017 AFE No X3-018HR-C: (2,814,936.20) Rig Name/No.: CDR -2 i Spud DateRme: 8/5/1983 12:00:OOAM Rig Release: 7/28/2017 Rig Contractor. NABORS ALASKA DRILLING INC. _ BPUOI: USA00000829 Active datum. KB @69.00usft (above Mean Sea Level) _ Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) Page 8 of 16 2000 - 22:30 2.50 DRILL P - 10,280.00 PROD1 RIH WITH 4.25° DRILLING BHA#5. i- RATE: 0.43 BPM IN, 0.52 BPM OUT. CIRC PRESSURE: 1,020 I PS - MUD WEIGHT: 8.94 PPG IN, 8.93 PPG OUT - - LOG DOWN FOR TIE-IN FROM 9,360' WITH -11.5'CORRECTION. RIH TO 10200' AND CLOSE EDC. 2230 - 0000 1.50 DRILL P 10,360.00 PROD? DRILL 4.25" BUILD FROM 10,260' MD TO 10,360' MO - FREE SPIN: 3,100 PSI, 2.60 BPM - RATE: 2.61 BPM IN, 2.57 BPM OUT, CIRC PRESSURE: 3, 100-3,550 PSI - MUD WEIGHT: 8.94 PPG IN, 8.98 PPG OUT, ECD: 9.99 PPG - ROP: 60 - 150 FT/HR, WOB: 1 - 2 KLBS - SEEING HIGH VIBRATION, TRY CHANGING PUMP RATES AND ROP TO MIMIMIZE. - PUMP 10 BBLS LO / HI VIS SWEEPS . _ AROUND. _ 00:00 - 05:00 5.00 DRILL P 10,700.00 PROD1 DRILL 4.25" BUILD FROM 10,360' MD TO 10,700' MD - FREE SPIN: 2,700 PSI, 2.32 BPM - RATE: 2.32 BPM IN, 2.30 BPM OUT. CIRC PRESSURE: 2,800 - 3,250 PSI - MUD WEIGHT: 8.95 PPG IN, 9.01 PPG OUT, ECD: 10.16 PPG - ROP: 60-150 FT/HR, WOB: 1 -2 KLBS - SEEING HIGH VIBRATION, USING REDUCED PUMP RATE AND MORE FREQUENT PICKUPS AND SWEEPS. - USE MPD CHOKE TO MAINTAIN 10.0 PPG AT THE WINDOW. - SWEEPS BRING BACK ABOUT 20% EXCESS CUTTINGS. - AT 10,530' PUMP 10 BBLS LO / HI VIS SWEEPS. AT 10,700' PUMP 5 BELS LO / HI VIS SWEEPS AROUND. - DRILL TO TO OF BUILD SECTION AT 10,700'. 15:00 - 06:00 1.00 DRILL P 10,700.00 PRODt WIPER TRIP BACK TO WINDOW, PREP TO LAY IN 9.8# MUD FROM TD. - 2.85 BPM IN AND OUT 13420 PSI - 8.9 PPG IN AND OUT 10.16 EMW ECD -NO MUD LOSS TO FORMATION -NO ISSUES PULLING POH OR TIH THROUGH -+-10,700.00 BUILD 6:00 - 07:00 1.00 DRILL P 'i PROD1 POH TO WINDOWAT 10 FPM -PUMP 10 BBL HI -VIS SPACER 2.8 BPM 3510 PSI j-FOLLOW SPACE WITH 9.6 MUD -SHUT PUMPS DOWN WHILE PUILING ABOVE WINDOW -DYNAMIC FLOW CHECK WELL, STATIC 2.80BPM IN AND OUT NO LOSS Hnntea 8/112017 10:09:09AM •A9 depths reported in Drillers Depths' Common Well Name: Event Type: RE-ENTI Rig Name/No.: C' Rig Contractor. N Active datum: KB Date RS ALASKA DRILLING INC. 100.i (above Mean Sea Le From - To Him (hr) - 09:30 1 2.50 North America - ALASKA - BP Operation Summary Report Start Date: 7/15/2017 End Date: 7/28/2017 Site: PB DS 14 Spud Datemme: 8/5/1983 12:00:OOAM I Task 09:30 - 10:30 I 1.00 DRILL 10:30 - 12:30 12:30 - 13:30 Page 9 of 16 AFE No X3-018HR-C:(2,814,936.20) Rig Release: 7/28/2017 Code NPT Total Depth Phase Description of Operations (usR) P 10,700.00 PROD? POH PUMPING AT 3.5 BPM AFTER WE GOT 9.6 PPG ALL THE WAY AROUND ! - SLOWED PUMP RATE TO 2.85 TO INCREASE PULLING SPEED AFTER 7000' MD -FLOW CHECK WELLAT 200' MD AND CONDUCT PJSM FOR HANDLING BHA PROPER DISPLACEMENT ON TRIP OUT, NO LOSSES P 10,700.00 PROD1 LO BUILD BHA -INSPECT PIPE AND UOC, GOOD SHAPE -POP-OFF AT 10:05 -LD BHA DOWN OUT MOUSE HOLE _ BIT GRADE I-2-WRG-XI-CT-BHA 2.00 DRILL P 10,700 00 PROD1 CONDUCT WEEKLY FUNCTION TEST OF BOPS FROM DRILLERS PANEL. 1.00 DRILL P 10,700.00 PROD1 MAKE UP 4.25' DRILLING BHA #6 - PICK UP 2-7/8' ULS MOTOR (1.2-AKO), AGITATOR AND 3°COILTRAK TOOLS I _I. 1330 - 17'.00 3.50 DRILL 17'.00 - 1730 0.50 DRILL 17:30 - 00:00 6.50 DRILL -MAKEUP 4.25 HYC BICENTER BIT -SURFACE TESTED COILTRACK TOOL, GOOD TEST. - PRESSURE TEST OTS TO 3,500 PSI HIGH FOR 5 MINUTES INJECTOR ON: 13:20 P 10,700.00 PROD1 RIH WITH 4.25° DRILLING BHA#8. - RATE: 0.38 BPM IN, 0.82 BPM OUT. CIRC PRESSURE: 1,000 PSI - MUD WEIGHT: 9.8 PPG IN, 9.8 PPG OUT -MAD PASS LOG FOR GEOLOGY FROM 10,180 -10280 - LOG DOWN FOR TIE-IN FROM 9,400'to 9445' WITH 11.5' CORRECTION. - RIH TO 10,200 P 10,700.00 PROD? RIH DISPLACING 9.8 PPG KILL MUD -PUMP 20 BBL HI -VIS SWEEP FOLLOW BY 8.6 PPG DRILLING MUD -PUMP SPACER TO JUST ABOVE EDC AND SHUT DOWN PUMPS -CLOSE EDC -PASS THROUGH WINDOW WITH OUT ISSUES -BRING PUMPS AT 1.2 BPM 2020 PSI AND RIH TO BTM -TAKE CHECK SHOT SURVEY AT 10,530' MO P 10,700.00 PROD1 DRILL 4.25°BUILD/LATERAL FROM 10,700'MD TO 10,930' MD - FREE SPIN: 3,850 PSI, 2.77 BPM - RATE: 2.76 BPM IN, 2.75 BPM OUT. CIRC PRESSURE: 3,850-4,200 PSI - MUD WEIGHT: 8.72 PPG IN, 9.76 PPG OUT, ECD: 10.16 PPG - STILL CIRCULATING 9.8# MUD OUT WHILE DRILLING. - ROP: 30- 100 FT/HR, WOB: 1 - 3 KLBS - AT 10,800' FEET PUMP 5 BELS LO / 10 BELS HI VIS SWEEPS. - AT 10,850' PULL 200 FT WIPER TRIP, CLEAN PASS UP AND DOWN. - USE MPD CHOKE TO MAINTAIN 10 PPG AT THE WINDOW. Printed 8111/2017 10:09:09AM *AII depths reported in Drillers Depths` Printed 8/11/2017 10 09 09A *All depths reported in Drillers Depths` North America - ALASKA - BP Page 10 of 16 Operation Summary Report Common Well Name: 14-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/15/2017 End Date: 7/28/2017 X3-018HR-C: (2,814,936.20) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: CDR-2 Spud Date/rime: 8/5/1983 12:00:OOAM Rig Release: 7/282017 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI. USA00000829 Active datum: KB @69.00usft (above Mean Sea Level _ Date From-To Him iTask Code NPT Total Depth Phase Description of Operations 722/2017 00:00 - 06:00 8.00 DRILL P 11,158.00 PRODt DRILL 4.25"BUILD/LATERAL FROM 10,930'MD TO 11,156' MD - FREE SPIN: 3,950 PSI, 2.77 BPM �- RATE: 2.77 BPM IN, 2.74 BPM OUT. CIRC PRESSURE: 3,850-4,300 PSI - MUD WEIGHT: 8.80 PPG IN, 8.87 PPG OUT, ECD: 10.24 PPG - USE MPD CHOKE TO MAINTAIN 10 PPGAT WINDOW. - AT 10,990' PUMP 5 BBLS LO / HI VIS SWEEP AROUND. -AT 11,000' PULL 200' WIPER TRIP. CLEAN PASS UP AND DOWN. - ADDED 0.5% (2 DRUMS) OF NXS LUBE. - AT 11,120' PUMP 5 BBLS LO / HI VIS SWEEPS DRILL P 11,156.00 PRODI AROUND. PERFORM LONG WIPER TRIP TO ABOVE 06:00 - 08:00 2.00 WINDOW FROM 11,156' MD TO 10,100' MD -RATE: 2.75 BPM IN, 2.75 BPM OUT. CIRC PRESSURE: 4100 PSI -SHUT DOWN PUMPS AND PULL THROUGH WINDOW, NO ISSUES -OPEN EDC, PUMP 5 BBL HIGH FOLLOW BY 5 BBL LOW -PUMP SWEEPS OUT AT 3.5 BPM 13725 PSI -CLOSED EDC -LOG DOWN FOR TIE-IN FROM 10245' TO 10288' MD - RA TAG WITH +3' CORRECTION -RIH THROUGH WINDOWAND OPEN HOLE DRILL P 11,174.00 PROD1 WITHOUT ISSUES _ DRILL4.25'BUILD/LATERAL FROM 11,156'MD 08:00 - 08:30 0.50 TO 11,174' MD - FREE SPIN: 4011 PSI, 2.77 BPM - RATE: 2.77 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 4114,300 PSI - MUD WEIGHT: 8.80 PPG IN, 8.87 PPG OUT, ECD: 10.24 PPG LOST SWAB ON #2 MUD PUMP 08:30 - 10:00 1.50 DRILL N 11,174.00 PROD? REPAIR #2 MUD PUMP SWAB -WORK PIPE OVER 150' -PUMP RATE 1.80 BPM 1/2660 PSI 10:00 - 17:30 7.50 DRILL P 11,174.00 PROD1 DRILL4.25" BUILD/LATERAL FROM 11,174 MD TO 11,297' MD - FREE SPIN: 4100 PSI, 2.77 BPM - RATE: 2.77 BPM IN, 2.74 BPM OUT. CIRC PRESSURE: 3,850-4,300 PSI - MUD WEIGHT: 8.80 PPG IN, 8.87 PPG OUT, ECD: 10.24 PPG - USE MPD CHOKE TO MAINTAIN 10 PPG AT WINDOW. j - AT 11290' PUMP 5 BBLS LO / HI VIS SWEEP AROUND PUMP RESSURE INCREASED 200 PSI AFTER STALL AT 11,290 - SLOWED PUMPS TO 2.6 BPM 14200 OFF BOTTOM - ROP SLOWS TO < 10 FT/HR AFTER 11,2501. Printed 8/11/2017 10 09 09A *All depths reported in Drillers Depths` North America - ALASKA - BP Page 11 of 16 Operation Summary Report Common Well Name: 14-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 71152017 End Date: 726/2017 X3-018HR-C: (2,814,936.20) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: CDR -2 Spud Daterrime: 8/5/1983 12:00:00AM 1 Rig Release: 728/2017 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000829 _Active datum: KB @69.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) 17:30 - 21:30 4 a0 (us t) DRILL P 11,297.00 PROD1 DYNAMIC FLOW CHECK ON BOTTOM IS GOOD, I RETURNS. START 15 BBL HI -VIS SPACER FOLLOWED BY 9.8# MUD. WHEN 9.8# REACHES BIT START POOH. CLEAN PASS UP, NOTHING SEEN AT iWINDOW. PULLTHROUGH WINDOWAND OPEN EDC. - MUD WEIGHT: 9.71 PPG IN, 9.76 PPG OUT RATE: 3.55 BPM IN, 3.00 BPM OUT OPEN EDC, POH FROM 10,200' MD '- RATE: 3.54 BPM. CIRC PRESSURE: 3,700 PSI TEST AGITATOR AT SURFACE, GOOD TEST. 21:30 - 22:00 0.50 DRILL P 11,297.00 PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - CLOSE EDC, POWER DOWN - INJECTOR OFF: 21:30 ! - INSPECT LAST 50' OF CT FOR WEAR SPOTS, NONE SEEN. _ - UD BHA Ise, BIT IS 6-3 WRUNG OUT ,22:00 - 23:00 1.00 DRILL P 11,297.00 PROD1 MAKE UP 4.25 -DRILLING BHA W7 - PICK UP 2-7/8" ULS MOTOR ( 1.2 DEG AKO) AND 3" COILTRAK TOOLS -MAKE UP 4.25" HYC BICENTER BIT - SURFACE TESTED AGITATOR AND COILTRACK TOOL. GOOD TEST. �- CIRC PRESSURE IS 3,450 PSI AT 2.38 BPM. PRESSURE TEST OTS TO 3,500 PSI HIGH i- FOR 5 MINUTES ' ON: 22:40 23:00 - 00:00 1.00 DRILL P 11,297.00 _-INJECTOR _ PROD? RIH WITH 3.0" DRILLING BHA #7 - RATE: 0.66 BPM IN, 1.15 BPM OUT. CIRC PRESSURE: 1,060 PSI MUD WEIGHT: 9.81 PPG IN, 9.80 PPG OUT 723/2017 00:00 - 02:00 2.00 DRILL P 11,2It 00 PROD1 CONTINUE RIH WITH BHA#7. - LOG DOWN FOR TIE-IN FROM 9,420' MD (FORMATION) WITH -8'CORRECTION 02:00 - 05:00 3.00 DRILL P 11,406.00 PROD1 DRILL 4.25"BUILD/LATERAL FROM 11,29T MD TO 11,406' MD - FREE SPIN: 4100 PSI, 2.60 BPM - START DRILLING AS SOON AS 8.8# IS AT THE BIT - RATE: 2.60 BPM IN, 2.58 BPM OUT, CIRC PRESSURE: 4,100-4,300 PSI - MUD WEIGHT: 8.87 PPG IN, 8.83 PPG OUT, ECD: 10.24 PPG - USE MPO CHOKE TO MAINTAIN 10 PPG AT WINDOW. - WHILE DRILLING AT 11,406 PRV LIFTS ON PUMP #11. - USE PUMP #2 WHILE REPLACING PIN ON PUMP #11. 11,406.00 PRODI REPAIR PRESSURE RELIEF VALVE ON#1 05:00 - 05:30 0.50 DRILL P MUD PUMP Printed 8/112017 10:09:09AM 'All depths reported in Drillers Depths' Common Well Name: 14-32 Event Type: RE-ENTER- ONSHORE (RON) Rip Name/No.: CDR -2 Rip Contractor NASO. North America - ALASKA - BP Operation Summary Report Start Date: 7/15/2017 End Data: 7/26/2017 8/5/1983 12:00:OOAM Pape 12 of 16 AFE No X3-018HR-C: (2,814,936.20) Rig Release: 7/28/2017 BPUOI: USA00000829 Active datum: KB 969.00usfl (above Mean Sea Level) Date From - To Him Task Code NPT I Total Depth Phase Description of Operations (hr) (usfl) 0530 - 1130 6.00 DRILL P 11,693.00 PROD1 DRILL 4.25' BUILD/LATERAL FROM 11,406' MD j TO 11,693' MD "FREE SPIN: 4100 PSI, 2.60 BPM - RATE: 2.60 BPM IN, 2.60 BPM OUT. CIRC PRESSURE: 4,100-4,480 PSI - MUD WEIGHT: 8.85 PPG IN, 9.05 PPG OUT, ECD: 10.33 PPG (OPEN CHOKE) - USE MPD CHOKE TO MAINTAIN 10 PPG AT WINDOW. STACKED OUT, PU MAX WT, RELAX AND TRY 1 MORE TIME -MAX PICKUP WEIGHT 80K 11:30 - 1330 2.00 DRILL N 11,693.00 PROD1 GET READY TO PUMP SPACER PILLAND LVT MINERAL OIL -PUMP 8 BBL SPACER FOLLOWED BY 17 BBLS OF LVT AND 10 BBLS OF SPACER -PUMP RATES WHILE PLACING SPACERS AND LVT 1.2-14 BPM -PUMP LVT AND SPACERS OUT, -PRESSURE BUILT TO 4440 PSI SLOWED PUMP DOWN TO 2.37 BPM -SEEN SOME WOB, PU TO 48 K -4 BBL OF LVT OUT OF BIT, PIPE BECOME FREE 13'.30 - 16:00 2.50 DRILL P 11693,00 PROD1 PERFORM LONG WIPER AND TIE-IN TO RA TAG IN WHIPSTOCK -POH AT 2.6 BPM AND 4300 PSI -CHASE SPACERS AND LVT OUT -STRING PUW AT 47K -WHEN LVF CAME TO SURFACE, CUTTINGS i INCREASE TO 100% OF SHAKER FOR 30 BBLS -LOG TIE-IN FROM 10245 TO 10,263 MD -+10 FT CORRECTION -RIHAT35FPM/ 1.01 BPM/2022PSI/ 21K _ SLACK OFF WT 16 00 - 1830 2.50 DRILL P 11,850.00 PROD1 _ DRILL 4.25° BUILD/LATERAL FROM 11,693' MD TO 11,850' MD - FREE SPIN: 4100 PSI, 2.60 BPM - RATE: 2.60 BPM IN, 2.60 BPM OUT. CIRC PRESSURE: 4,100-4,480 PSI - MUD WEIGHT: 8.95 PPG IN, 9.00 PPG OUT, ECD: 10.25 PPG (OPEN CHOKE) - USE MPD CHOKE TO MAINTAIN 10 PPG AT WINDOW. Printed 8/11/2017 10,09:09AM •AII depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 13 of 16 Common Well Name: 14J2 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/15/2017 Eno Date: 7/26/2017 X3-018HR-C: (2,814,936.20) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: CDR -2 Spud DateTme: 8/5/1983 12:0O:OOAM Rig Release: 7/28/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOL USA00000829 Active datum: KB 069.00usft (above Mean Sea Level) Data From -To His Task Code NPT Total Depth Phase Description of Operations _ (hq II i (usft) 18:30 - 23:30 5.00 DRILL I P 12,140.00 PROD? PULL 300' WIPER TRIP FROM 11,850' CLEAN PASS UP AND DOWN. AT 11,850' PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. DRILL 4.25' LATERAL FROM 11,850' MD TO 1 12,140' MID - FREE SPIN: 3,800 PSI, 2.60 BPM - RATE: 2.60 BPM IN, 2.60 BPM OUT. CIRC PRESSURE: 3,800 - 4,100 PSI - MUD WEIGHT: 8.86 PPG IN, 8.90 PPG OUT, ECD: 10.21 PPG - USE MPD CHOKE TO MAINTAIN 10 PPG AT WINDOW. - AT 11 960' PUMP 10 BBL L S O / HI VIS SWEEPSAROUND. FREQUENTCONDUCT UPS AFTER PERIODS OF FASTDRILING. - AT 11,990 PULL 300' WIPER TRIP, CLEAN PASS UP AND DOWN. - AT 12,120' PUMP 10 BBLS LO / HI VIS SWEEPS. - SWEEPS BRINGING BACK AROUND 20 - 30S EXCESS CUTTINGS. 23:30 - 00:00 0.50 j DRILL P 12,140.00 PROD1 PERFORM LONG WIPER AND TIE-IN TO RA IL TAG IN WHIPSTOCK - SWAB ON PUMP #2 HAS GONE OUT, REPAIR WHILE PULLING WIPER TRIP. 7/24/2017 00:00 - 00:30 0.50 DRILL P 12,14000 PRODI CONTINUE WIPER TRIP. REDUCE RATE AND KEEP AS DRILLED TF THROUGH SHALES. PULL THROUGH WINDOW AND OPEN EDC. 00:30 - 01:00 0.50 DRILL N 12,140.00 PROW CONTINUE CIRCULATING WITH 1 PUMP ABOVE WINDOW WHILE REPAIRING SWAB. MAINTAIN 10.0 PPG ECD AT THE WINDOW. 01:00 - 02:00 1.00 DRILL I P 12,140.00 PRODi PUMP 1 B/U FROM WINDOW WITH OPEN EDC. • 3.73 BPM / 4,160 PSI GETTING STEADY AMOUNT OF CUTTINGS BACK WHILE PUMPING AT HIGH RATE. 02:00 - 03:00 1.00 DRILL P PROD1 AFTER 1 e/U WELL CLEANS UP. TIE-IN DEPTH, CORRECT -3 FT. RIH TO BOTTOM, CLEAN PASS. KEEP MIN RATE AND AS DRILLED TF — THROUGH SHALES. 03:00 - 09:30 6.50 DRILL P 12,390.00 PROD1 DRILL4.25 'BUILD/LATERAL FROM 12,140' MD TO 12,390' MD TD - FREE SPIN: 4100 PSI, 2.63 BPM - RATE: 2.63 BPM IN, 2.57 BPM OUT. CIRC PRESSURE: 4,100 - 4,480 PSI - MUD WEIGHT: 8.91 PPG IN, 8.96 PPG OUT, ECD: 10.24 PPG - USE MPD CHOKE TO MAINTAIN 10 PPG AT WINDOW. AT 12,230' PUMP 5 BBLS LO/HI VIS SWEEPS - I 'AROUND. 10:09:09AM 'AII depths reported in Drillers Depths" Common Well Name: 14-32 Event Type: RE-ENTER- ONSHORE (RON) Project: Prudhoe Bay Rig Name/No.: CDR -2 Rig Contractor: NABORS ALASKA DRILLING Active datum: KB @69.00usR (above Mean Sr Date From - To I HIM - 14:30 , 3.00 14:30 - 18:00 3.50 11800 - 22'.30 4.50 22'. 7/25/2017 00:00 - 01:00 01:00 - 0330 Printed 8/11/20 North America - ALASKA - BP Operation Summary Report AFE No Start Date: 7/15/2017 End Date: 7/26/2017 X3-018HR-C: (2,814,936.20) Page 14 of 16 ayuu valor ume. ww Iwai 1z:uu:uuAM Rig Release: 7/28/2017 BPUOI: USAOD000829 Task Code NPT Total Depth Phase Description of Operations (usfl) DRILL P 12,390.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 12,390' MD TO 10,200' MD - RATE: 2.55BPM / CIRC PRESSURE: 4330 PSI -PUMP 5 LOW FOLLOWED BY 5 HIGH VIS - 20% INCREASE IN CUTTING RETURN AT THE SHAKER -PULLING THROUGH SHALE AT 11,000' MD (- AND WINDOW NO ISSUE DRILL P 12,390.00 PROD1 WIPER TRIP TO SURFACE TO CLEAN CUTTING FROM 51/7'TUBING ANNULUS -OPEN EDC -JET SLIDE AT 3.8 BPM / 4350 PSI -POH AT 80 FPM 3.85 BPM /4300 PSI 110.52 ECD RETURN INCREASE CUTTINGS 60 TO 80% ALL THE WAY TO SURFACE, PULLED SLOWED THE LAST 1500' TO GET THE SHAKERS TO L_ _ CLEANUP DRILL P 12,390.00 PROD1 RIH WITH THE LONG WIPER -TAG UP TO VERIFY DEPTH -13 FEET ON THE BACK COUNTER -RIH AT 95 FPM /2 BPM/2300 PSI -HOLDING 10.3 ECD AT WINDOW -CUTTINGS RETURNS MINIMAL LOG TIE-IN, CORRECT -12'. _ RIH TO TAG BOTTOM. DRILL P 12,393.00 PROD1 TAG AT 12,393' CORRECTED DRILLED TD. PICK UP AND PERFORM 10 MIN DYNAMIC FLOW CHECK ON BOTTOM, GOOD. POOH LAYING IN 9.8# BEAD PILL FOLLOWED BY 9.8# MUD. PULL THROUGH WINDOW, OPEN EDC. JET WHIPSTOCK TRAY, CONTINUE CIRCULATING 9.8# AT 3.8 BPM / 4,200 PSI. - MUD WEIGHT: 9.81 PPG IN, 9.81 PPG OUT - RATE: 3.69 BPM IN, 3.18 BPM OUT OPEN EDC, POH - RATE: 3.70 BPM. CIRC PRESSURE: 4,250 PSI - FLAG PIPE AT 9,200' AND 7,100' EOP. DRILL P 12,393.00 PROD? MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC, POWER DOWN - INJECTOR OFF: 23:00 - OPEN RISER AND INSPECT LAST 50' OF CT, FLAT SPOT IS OBSERVED THAT MEASURES 0.128" WALL THICKNESS. - WILL CUT IT OFF BASED ON 30% WALL THICKNESS LOSS GUIDELINES. - UD BHA, BIT IS 2-3. 1.00 1 EVAL P 12,393.00 PROD? INSTALL COUNTER ON REEL FOR SLB LOGGERS. 2.50 EVAL P 12,393.00 PROD1 CUT OFF CT CONNECTOR. TRIM 16 FT OF CT TO FIND A GOOD SPOT FOR THE CONNECTOR. INSTALL CT CONNECTOR. PULL TEST TO 50K IS GOOD. PRESSURE TEST TO 3,500 PSI IS GOOD. 10:09:09AM *AII depths reported in Drillers Depths' Common Well Name: 14-32 Event Type: RE-ENTER- Of Proiect: Prudhoe Bay Rig Name/No.: CDR -2 Rig Contractor: NABORS ALAS KA Active datum: KB @69.00usft (abc Data From - To 03:30-07 00 North America - ALASKA - BP Operation Summary Report Start Date: 7/15/2017 End Date: 7/262017 Datemme: 8/5/1983 NG INC. n Sea Level Hrs Task Code NPT Total Depth Phase 09:00 2.00 1 EVAL 09:00 - 11:00 2.00 EVAL 11:00 - 13:15 I 2.25 1 EVAL - 16:30 1 3.25 1 EVAL 16:30 - 18:30 ! 2.00 EVAL 118:30 - 21:00 2.50 EVAL _ RIH HATH SLB LOGGING TOOLS - 00:00 3.00 EVAL -TURN TOOLS ON AT 300', SHOWING A OPEN 121:00 Page 15 of 16 AFE No X3018HR-C: (2,814,938.20) Rig Release: 7/28/2017 BPUOI: USA00000829 Description of Operations P i 12,393.00 PRODi MAKE UP LOGGING TOOLS -PJSM WITH NABORS RIG CREW, BP WSL, SLB LOGGER, BHI DD AND MWD -MAKE UP BHI CABLE HEAD, TROUBLE WITH CONNECTION, REPLACE SUB -MAKE SLB TOOLS -VALIDATE TOOLS ARE WORKING - PRESSURE TEST OTS TO 3,500 PSI HIGH FOR 5 MINUTES �- INJECTOR ON: 06:40 P 12,393.00 PROD? I _ RIH HATH SLB LOGGING TOOLS -CIRC 0.52 BPM\952 PSI 75 \FPM -TURN TOOLS ON AT 300', SHOWING A OPEN CONNECTION -RIH TO 5000' IN AN ATTEMPT TO WARM UP TOOLS AND HOPEFULLY COME BACK TO LIFE TOOLS STILL NOT COMMUNICATING AT 5000. MD N 12.393.00 PROD1 POH WITH LOGGING TOOLS -PUMP AT 0.52 BPM AND 1000 PSI \ PULLING AT 80 FPM -HOLE TAKING CORRECT FILL -FLOW CHECK AT 200', STATIC POP-OFF INJECTOR AT 10:30 N 12,393.00 PROD? TROUBLESHOOT TOOLS AND BATTERY REFRESH BATTERY ON SURFACE AND RE -TEST TOOLS, GOOD. MAKE UP CABLE HEAD TO LOGGING TOOL AND TEST, GOOD, PULL TOOLS OUTAND INSERT SOURCES. MAKE UP UOC TO TOOLS, MAKE UP INJECTOR, TEST OTS 703,500 PSI, GOOD. INJECTOR ON AT 13:00. P 12,393.00 PROD1 _ RIH WITH LOGGING BHA #9 - RATE: 0.52 BPM IN, 0.86 BPM OUT. CIRC PRESSURE: 940 PSI - MUD WEIGHT: 9.79 PPG IN, 9.86 PPG OUT - SLOW RIH SPEED PASSING ALL JEWELRY. - LOG DOWN FOR TIE-IN FROM 9,400' (FORMATION) WITH -10' CORRECTION P 12,393.00 PRODt W7 CHECKAT 10,150'IS 45K. PASS THROUGH WINDOW WITH NO ISSUES, 1 RIH TO BOTTOM CAREFULLY. SETTING WTAT 12,080', WORK PAST STOPAT 12,373' AND OPEN CALIPERARMS. P 1 12,393.00 PRODI LOG UPAT 30 FT/MIN FROM 12,373' TO 10,150'. RIH BACK TO 10,980' FOR REPEAT PASS. LOG FROM 10,960' BACK UP TO 10,150'. P 12,393.00 PRODi MONITOR WELL FOR 10 MINUTES WITH DYNAMIC FLOW CHECK: STATIC - MUD WEIGHT: 9.82 PPG IN, 9.83 PPG OUT - RATE: 1.05 BPM IN, 1.03 BPM OUT POH FROM 10,175' MD - RATE: 1.05 BPM, CIRC PRESSURE: 1,530 PSI - PAINT FLAGS AT 9,200' AND 7,100' EOP ON THE WAY OUT. - SLOWDOWN PULLING THROUGH ALL THE Printed 8/11/2017 10:09:09AM 'All depths reported in Drillers Depths' Common Well Name: 14-32 Event Type: RE-ENTER- Of North America - ALASKA - BP Operation Summary Report Stan Date: //15/2017 End Date: AFE No (3-018HR-C: (2,814,936.20) Page 16 of 16 Rig Name/No.: CDR -2 I Spud Date/Time: 8/5/1983 12:00:00AM Rig Release: 7/28/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000829 Active datum: KB @69.00usft (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/26/2017 00:00 - 02:00 2.00 _ EVAL P 12,393.00 PROD1 MONITOR WELL FOR 0MMINUTESAT BHA: STATIC - CONDUCT PJSM WITH NABORS AND SLB CREW FOR LAYING DOWN LOGGING TOOLS. - INJECTOR OFF: 00:25 - LAY DOWN LOGGING TOOLS, SEND SOURCES DOWN. - CONTINUE BREAKING OFF LOGGING BHA, LAYING DOWN TOOLS Printed 8/11/2017 10:09:09AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 1 orb Operation Summary Report Common Well Name: 14-32 AFE No Event Type: COM- ONSHORE (CON) Start Data 7/26/2017 End Date: 7/28/2017 X3-018HR-C: (991,343.19) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: CDR -2 Spud DateTme: 8/5/1983 12:00:OOAM Rig Release: 7/28/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000829 Active datum: KB @69.00usft (above Mean Sea Level) Date I From - To Hrs�, Task Code NPT Total Depth Phase Description of Operations _ tq—__ I (-to P 12,393.00 RUNPRD CLEAR AND CLEAN RIG FLOOR. PREP AND 7/26/2017 02:00 - 06:15 4.25 CASING BOOT E -LINE. -MU BHA FOR PUMPING SLACK. CIRCULATE FORWARD TO PUMP E -LINE SLACK OUT. - RETRIEVE 332'OF E -LINE - BOOT E -LINE - PUMP 3W' BALL AROUND 06:15 - 08:30 2.25 CASING P 12,393.00 RUNPRD RIG UP EQUIPMENT FOR RUNNING LINER - DRIFT/ CALIPER TOOLS j - CONFIRM SAFETY JOINT MAKEUP PJSM FOR MAKING UP LINER WITH EMPHASIS ON MONITORING WELLBORE _ (CURRENTLY ON SLIGHT LOSSES) 08:30 - 12:00 3.50 CASING P� 12,393.00 RUNPRD _ MU 3-1/4" BY 3-1/2" LINER ASSEMBLY - MU AGITATOR AND SHEAR SUB INTO SHOE TRACK (NOT TYPICAL) - MU AND FILL FIRST 20 JOINTS - CONDUCT COMPLEX WELL CONTROL KICK WHILE MAKING UP LINER DRILL. CREW RESPONSE DEMONSTRATED COMPETENCY YET WILL CONDUCT SIMILAR DRILL VERY SOON TO ALLOW TEAM MORE PRACTICE. CONDUCT AAR AND IT REVEALED SEVERAL INPUTS TO MAKE OPERATION MORE EFFICIENT. NOTABLY, TEAM RECOGNIZED NEED FOR UNIQUE CROSSOVER IN ORDER TO BE ABLE TO USE RIG KELLY HOSE TO CIRCULATE DOWN TUBING STRING IN EVENT OF WELL CONTROL SITUATION IN WHICH COIL CANNOT BE MADE UP. CROSSOVER IS ON LOCATION. - CONTINUE WITH MAKE UP OF LINER ASSEMBLY - DISCUSSAAR OF PREVIOUS DRILL WITH INCOMING CREWAND DISCUSS OPPORTUNITIES FOR IMPROVING 1200 - 1830 6.50 CASING P 12,393.00 RUNPRD CREW CHANGE OUT, RESUME MAKING UP 3-1/4" BY 3-1/2" COMPLETION LINER ASSEMBLY - CONDUCT SIMILAR UNANNOUNCED KICK WHILE MAKING UP LINER DRILL. TEAM HAD MUCH BETTER RESPONSE TO ALARM. WELL CLOSED IN WITH CHOKE HCR AND FOSV SHUT IN 5 MIN, 15 SEC. COMPLETE DRILL BY HAVING PERSONNEL RADIO IN FROM STATIONS, CONDUCT AAR, NOTES OF POSITIVE REACTION TO HOW SAFETY JOINT WAS MOBILIZED, HOW FLOORHANDS ACTED IN UNISON TO STAGE AND TORQUE SAFETY JOINT. NOTES FOR IMPROVEMENT WERE TO USE CHAIN TONGS TO SNUG UP SAFETY JOINT BEFORE TORQUE WITH TONGS AND TO SPECIFICALLY ASSIGN A PERSON TO CLOSE VALVE ON THE CHOKE MANIFOLD IN PREPARATION FOR LINING UP TO WELL CONTROL CHOKE. GIVE ALL CLEAR. - CONTINUE WITH MAKING UP LINER ASSEMBLY Printed 8/11/2017 10:09:35AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 14-32 AFE No Event Type: COM- ONSHORE(CON)Start Date: 7/26/2017 1End Date: 7/28/2017 X3-018HR-C:(991,343.19) Page 2 at 6 I n,y rvanvrva: wrt-e I Sputl Date/Time: 8/5/1983 12:00:00AM Rig Release: 7/28/2017 1 Active_ datum: KB @69.00usft (_above Mean Sea Level) Date From -To Him Task .. (hr) 20:00 - 20:30 1I 0.50 CASING 20:30 - 00:00 3.50 CASING 10:09.35AM 'All depths p reported in Drillers Depths' SPUOI: USA00000829 P 12,393.00 DOWN. CONTINUE WORKING PIPE DOWN TO 12,000'. RUNPRD CONTINUE WORKING LINER TO BOTTOM. 7/27/2017 Code NPT Total Depth I Phase Description of Operations TRY PUMPS ON AND OFF, DIFFERENT (usft) P 12,393.00 RUNPRD FINISH MAKING UP 3-1/Z' LINER. WORK PIPE DOWN TO 12,120'. RUNPRD CONTINUE WORKING LINER DOWN. CONDUCT KICK DRILL WITH MILLER CREW WORK LINER TO 12,388'. PRIOR TO CHANGING OUT ELEVATORS. HIT THIS SPOT 5 TIMES, PUMPS ON PUMPS GOOD RESPONSE BY CREW, WELL IS OFF, SOLID BOTTOM. SECURED AS PER STANDING ORDERS IN 4 MIN. HAVE AAR AFTERWARDS. FINISH MAKING UP 6 JTS pHs AND SWIVEL. MAKEUP INJECTOR, ONAT 20:00. P 12,393.00 _ RUNPRD TESTOTST03,500PSIFOR5MIN,GOOD. VERIFY CORRECT # OF JOINTS LEFT OVER. ZERO COUNTERS, RIH. RATE: 0.55 BPM IN, 0.99 BPM OUT. MUD WEIGHT: 9.80 PPG IN, 9.87 PPG OUT. CIRC PRESSURE 1,400 PSI. INJECTOR ON 20:00 P 12,393.00 RUNPRD STOPAT FIRST FLAG AND CORRECT -16'. CONSISTENT WITH CORRECTIONS WHILE DRILLING. UP WEIGHTAT WINDOW IS 51KAT 30 FT/MIN, 0.25 BPM. EASE PUMP RATE UP TO 2 BPM GOING INTO OPEN HOLE. PAST 11,550' PUMP 2.50 BPM / 4,000 PSI. PRESSURE SPIKING WITH ERRATIC RETURNS, NOTA SMOOTH PASS TO BOTTOM. SLOWDOWN RIH SPEED TO ALLOW CIRCULATION TO WORK STACK WT AT 11,742', PICKUP IS 65K. HAVE TO REDUCE PUMP TO 0 TO KEEP THE GS ENGAGED, COMING UNLATCHED EVEN AT LOW PUMP RATES. WORK DOWN TO 11,824' STACKING WEIGHT. PUMP 10 BBLS HIAAS SWEEP WITH LUBES 10:09.35AM 'All depths p reported in Drillers Depths' 00:00 - 02:20 2.33 CASING P 12,393.00 DOWN. CONTINUE WORKING PIPE DOWN TO 12,000'. RUNPRD CONTINUE WORKING LINER TO BOTTOM. 7/27/2017 TRY PUMPS ON AND OFF, DIFFERENT RUNNING SPEEDS. 02:20 - 04.30 2.17 CASING 11 P 12,393.00 WORK PIPE DOWN TO 12,120'. RUNPRD CONTINUE WORKING LINER DOWN. WORK LINER TO 12,388'. HIT THIS SPOT 5 TIMES, PUMPS ON PUMPS OFF, SOLID BOTTOM. 10:09.35AM 'All depths p reported in Drillers Depths' North America - ALASKA - BP Page 3 of 6 Operation Summary Report Common Well Name: 1432 AFE No Event Type: COM- ONSHORE (CON) Start Date: 7/26/2017 End Date: 728/2017 IX3-018HR-C: (991,343.19) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: CDR -2 Spud DateTme: 8/5/1983 12:00:00AM Rig Release: 728/2017 Active datum_: KB @69.00usR (a Data From-To in Sea Level) Him Task me 3.50 CASINi Code I NPT I Total Depth Phase Description of Operations 08.00 - 10:15 1 2.25 1 CASING I P 10.15 - 11.00 11:00 - 13:15 0.75 1 CASING I P 2.25 1 CASING I P 13:15 - 16:15 1 3.00 CASING 1 N I 16'.15 - 18:00 1.75 CASING P 11 (usR) 12,393.00 RUNPRD STACK WT DOWN, START SWAPPING WELL TO KCL. PUMP 2.02 / 1.18 BPM AT 3,000 PSI. - LOSSES FAIRLY CONSISTENT AT -50% AT 2 BPM. LOWERED RATE TO 1.5 BPMANDAS MORE OF THE 9.8 PPG IS DISPLACED LOSSES ARE SLOWING. CURRENT LOSS RATE AT -40% AT 1.5 BPM. - LOSS RATE DROPPED SIGNIFICANTLYAS HEAVIER MUD WAS DISPLACED UP HOLE ABOVE LINER TOP. IMPROVED TO LESS THAN 10% AT 2.57 BPM IN, 2.39 BPM OUT DURING FINAL DISPLACEMENT. - CIRC PRESSURE OF 2000 PSI AT 2.57 BPM IN WITH 8.45 PPG KCLALLTHE WAYAROUND AND G -SPEAR STILL STUNG INTO LINER ASSEMBLY WITH AGITATOR ON BOTTOM. - CIRC PRESSURE OF 200 PSI AT .5 BPM, 930 PSI AT 1.5 BPM WITH 8.45 PPG FLUID ALL THE WAV AROUND AND CIRCULATING THROUGH STRING OFF BOTTOM. POP OFF OF LINER WITH G -SPEAR. BRING r12,39t3.00RUNPIRD RATE UP TO 2.68 BPM, 2200 PSI, AND POH. - LOSS RATE OF 9 BPH ON TRIP OUTAT 2.68 BPM - FLOW CHECK WITH BHA BELOW SOP FOR 10 MINUTES. - PULL TO SURFACE, POP OFF WITH _ INJECTORAT 1015 HRS 12,393.00 RUNPRD _ LD BHA WITH NO ISSUES - MONITOR WELL, LOSSES AT -20 BPH. FILL ACROSS TOP WITH NEWLY INSTALLED SECONDARY KILL LINE. 12,393.00 RUNPRD CUT OFF EXTERNAL CONNECTOR. INSTALL BOT INTERNAL SLIM LINE CONNECTOR, PULL AND PRESSURE TEST. - BOTH TESTS GOOD - MOBILIZE BHA COMPONENTS TO PIPE SHED AND RIG FLOOR - TEAM VERIFYING OD I ID / DRIFT AND REPORT TO WSL THAT SEVERAL OF THE WORK STRING OD WILL NOT PASS THROUGH CROSSOVER NEAR BOTTOM OF ASSEMBLY (POTENTIAL TO LOSE 30' OF PRODUCTIVE ZONE) - WSL VERIFIES THAT OD DOES NOT MEET API STANDARD 2,393.00 RUNPRD WSL DISCUSSES CONCERNS WITH ODE. DISCUSS ALTERNATIVES, STRAP OTHER WORK STRING COMPONENTS AND DISCUSS TOLERANCES. DEVELOP PLAN TO USE DIFFERENT COMPONENTS. - BOT REPRESENTATIVE MOBILIZES OUT _ CROSSOVERSAND 1-1/4" WORK STRING 12,393.00 RUNPRD PJSM FOR MAKING UP BHA. - MU BHA PER APPROVED PLAN - STAB ON WITH INJECTOR AT 17:30, PRESSURE TEST QUICK TEST SUB. TEST FAILED. INSPECTAND REPLACE O -RINGS, RE -TEST TO 3500 PSI. TEST GOOD. 10:09:35AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 4 of 6 Operation Summary Report Common Well Name: 14-32 AFE No Event Type: COM- ONSHORE (CON) Start Date: 7/26/2017 End Date: 7/28/2017 X3-018HR-C: (991,343.19) Rig NameMo.: CDR -2 I Spud Date/Time: 8/5/1983 12:00:OOAM Rig Release: 728/2017 Rig Contractor NABORS ALASKA DRILLING INC. BPUOI: USA00000829 Active datum: KB 069.00usB (above Mean Sea Levell Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) 2.00 CEMT (usft) P 12,393.00 RUNPRD RIH WITH WEATHERFORD CEMENT 18:00 - 20:00 RETAINER BHA - PUMPING DOWN BACK SIDE TO MAINTAIN HOLE FILL. CANNOT PUMP DOWN COIL WHILE RUNNING RETAINER TOOL DOWN. - ABOUT 20 BBLMR LOSSES WHILE RIH. - MUD WEIGHT IN: 8.45 PPG, MUD WEIGHT 0.33 CEMT _ P 12,393.00 RUNPRD OUT 8.45 PPG. STOP AT FIRST FLAG AND CORRECT -13 FT, 20:00 - 20:20 CONSISTENT WITH EARLIER DRILLING CORRECTIONS. NO CORRECTION AT SECOND FLAG, 1.67 CEMT _ P 12,393.00 RUNPRD EXACTLY ON DEPTH. _ PRIOR TO ENTERING LINER TOP, ERRATIC 20:20 - 22:00 DENSITY READINGS SEEN ON OUT MM. STOP AND FLOW CHECK WELLAT WHITEY VALVE ON RISER. NO PRESSURE, NO FLOW. VERY SLIGHT AMOUNT OF GAS TRAPPED IN THE RISER THAT DIMINISHES TO ZERO < 1 MIN, 3 - e% LEL READINGS. WELL IS ON LOSSES, TRIP SHEET IS -16 BBLS TO THIS POINT. NOTIFY WSUP AND SENIOR WSL. DECISION IS MADE TO TAKE RETURNS TO TIGER TANK AND CONTINUE TRIP IN HOLE, CONTINUE KEEPING HOLE FULL BY PUMPING ACROSS THE TOP. UP WTAT LINER TOP IS 4IK. CONTINUE RIH, VERY SLIGHT WT BOBBLE 22:00 - 22:50 0.83 CEMT P 12,393.00 RUNPRD SEEN ENTERING LINER TOP. _ UP WTAT 12,200' IS 48KAT 25 FT/MIN. - 00:00 1.17 CEMT P 7/28/2017 00:00 - 01:00 1.00 T CEMT P 01:00 - 02:00 1.00 CEMT P RIH, LIGHT TAGAT 12,370'. PICKUP AND REPEAT, SAME DEPTH. PICKUPTO BREAKOVER Wf+SFT FOR SETTING DEPTH. REEL IS IN A DIFFICULT SPOT FOR LAUNCHING BALL. LINE UP DOWN THE CTAND BREAK CIRCULATION, PUMP 0.27 / 0.18 BPM AT 120 PSI. 12,393.00 RUNPRD CONDUCT PJSM AND REVIEW PROCEDURE FOR DROPPING BALL. DROP 12" ALUMINUM BALLAND LAUNCH WITH 2,000 PSI. CIRCULATE BALL AS PER WFT REPAT 1.321 1.17 BPM AT 1,850 PSI. BALL IS NOT HEARD ROLLING. AFTER 70% REEL VOLUME SLOW PUMP TO 07 BPM. 12,393.00 i RUNPRD CONTINUE CIRCULATING BALL TO SEAT. NOTHING SEEN AFTER 70 BBLS, EASE RATE UP TO 1 BPM. NOTHING SEEN AFTER 80 BBLS, TRY SURGING PUMP WITH 2,500 PSI. 12,393.00 RUNPRD CIRCULATE 1.43/1.31 BPM AT 815 PSI. NOTHING SEEN AFTER 70 BBLS Pnnted 8/11/2017 10:09:35AM *All depths reported in Drillers Depths' Common Well Name: 14-32 Event Type: COM- ONSHORE (CON) North America - ALASKA - BP Page 5 of 6 Operation Summary Report Start Date: 7/26/2017 End Date: 7/26/2017 Site: PB DS 14 Spud Datarrime: Active datum: KB Q69.00uslt (above Mean Sea Level) Data From - To HIM (h0 rO2:00 - 03:00 1.00 I I Task Code NPT Total Depth (..ft) CEMT P 12,393.00 03:00 - 04:30 1 1.50 1 CEMT 0430 - 06:00 1 1.50 1 CEMT 06.00 - 08'.00 2.00 CEMT P 12,393.00 P 12,393.00 P 12,393.00 AFE No X3-018HR-C: (991,343.19) Rig Release: 7/28/2017 SPUOI: USA00000829 Phase Description of Operations RUNPRD REVIEW CHARTED PRESSURE DATA FROM SECOND PUMP SURGE, APPEARS THE PRESSURE SURGE PUT THE BALL ON SEAT AND SHEARED IT OUT RIGHT AFTERWARDS, SET BK DOWN ON RETAINER TO CONFIRM SET. CIRC PRESSURE IS ABOUT HALF AS MUCH DISCUSS PLAN FORWARD WITH WFT SUPERVISOR IN DEADHORSE AND ODE, BASED ON PRESSUREAND WEIGHT IT APPEARS THAT THE RETAINER IS SETAND THE FLOWPATH IS AROUND THE LINER. DECISION IS MADE TO PROCEED WITH THE RUNPRD CIRCULATE I X B/U OUT TO TIGER TANK TO CLEAN UP WELL. NO GAS SEEN ON BOTTOMS UP, BRING RETURNS INSIDE. RUNPRD PRESSURE TEST SLB CEMENT LINES UP TO INNER REEL VALVE, WSL PERFORM PRESSURE XCHECK VERIFICATION WITH SLB PUMP OPERATOR. VERIFY LOW PRESSURE TRIPS. PRESSURE TEST CEMENT LINE TO 4,700 PSI, GOOD. - PJSM FOR CEMENT JOB WITH ALL ON LOCATION. DISCUSS MAXIMUM PRESSURES, VALVEAND FLUID LINE-UPS, RESPONSE TO H2S ALARMS OR INDICATIONS. - RETURNS ARE ALMOST ONE-TO-ONE DURING PJSMAT 1.27 BPM IN, 1.26 BPM OUT _ RUNPRD MIX AND PUMP 31.8 BBLS OF CEMENT: - CEMENT WET AT 0552 HRS. - ZERO IN MM ONCE DENSITY = 13.8 PPG - LOAD 31.8 BBLS 15.3 PPG CEMENT IN REEL AND SWAP TO RIG PUMP PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 8.4 PPG EXHAUST PILL - INITIAL RATE OUT 2.80 BPM IN, 2.67 BPM OUT, LOWER RATE WITH CEMENT MOVING THROUGH RETAINER TOOL DISPLACE THROUGH WEATHERFORD CEMENT RETAINER TOOL - DISPLACE AT 1.75 BPM OUT, 1.60 BPM OUT, 3530 PSI - OPEN BAKER CHOKE AND CHECK FLOATS. GOOD TEST. - CEMENT IN PLACE: 0745 HRS -CLOSE BAKER CHOKE. FOLLOW WEATHERFORD PROCEDURE FOR PICK UP TO RELEASE RETAINER TOOL. PU 4K OVER, CLEAN RELEASE. - 25.9 BBLS CEMENT BEHIND PIPE - TOTAL LOSSES FROM CEMENT EXIT SHOE Printed 8/11/2017 10:09:35AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 6 of 6 Common Well Name: 1432 AFE No Event Type: COM- ONSHORE (CON) Start Date: 7/26/2017 End Date. 7/28/2017 X3-018HR-C: (991,343,19) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: CDR -2 Spud Date/time: 8/5/1983 12:00:OOAM Rig Release: 7/28/2017 Rig Contractor NABORSALASKA DRILLING INC. BPUOI: USA00000829 Active datum: KS @89.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth I Phase Description of Operations (hr) Wsft) 08:00 - 13:00 5.00 CEMT P 12,393.00 RUNPRD _ PICK UP TO BREAKOVER PLUS 4K, CLEAR INDICATION OF RETAINER RELEASE. - BRING PUMPS ON TO 1.5 BPM, 2170 PSI AND CIRCULATE TO CLEAN LINER. BEGIN MOVING AFTER 5 BELS OUT. PICK UP SLOWLY TO CLEAN LINER MAINTAINING 1.50 BPM, 2170 PSI. INCREASE RATE TO 2.6 BPM, 2500 PSI. - PULL TO LINER TOP, SLOWLY EXIT AND SEE 200 PSI PRESSURE DROP. CIRCULATE IN PLACEAT 2.5 BPM. - INCREASE RATE TO 3.0 BPM, 1950 PSI AND BEGIN PULLING UP HOLE TO DISPLACE WELL TO 8.4 PPG CLEAN KCLAND CIRCULATING CEMENT RETURNS OUT OF WELL. - HAVE ONE-TO-ONE RETURNS ON TRIP OUT, 8.43 PPG MW IN AND OUT - CONDUCT PRESSURE CROSSCHECK WITH LITTLE RED SERVICES, RU AND PRESSURE TEST TO 3500 PSI. WSL WITNESS PUMP TRIPS. - LAY IN DIESEL FREEZE PROTECT ON TRIP OUT - PULL TO SURFACE WITH BHA BELOW BOP, FLOW CHECK. FLOW CHECK GOOD, NO FLOW -WELL IS STATIC. POPOFF,BREAK OFF BHAAND LAY DOWN. MOBILIZE WEATHERFORD TOOLS OFF OF RIG. - CLOSE IN MASTER AND SWAB VALVE, MONITOR WELL THROUGH WING VALVE (MPD LINE) SENSOR - SENT IN BOP TEST NOTIFICATION TO AOGCC AT 1220 HRS FOR NOON TEST TIME ON 7/29/2017. RECEIVED REPLY BACK TO KEEP AOGCC REP UPDATED. 1300 - 1800 Soo RIGD P 12,393.00 POST MAKE UP NOZZLE FOR PUMPING SLICK BACK - STAB ON, DISPLACE TO FRESH WATER. PUMP BACK FOR SLACK MANAGEMENT, ATTEMPT TO OBTAIN 1.7% (288'). - POP OFF, CUT CONNECTOR OFF. TRIM COIL. CUT 290' OF COIL, E -LINE IS NOT VISIBLE. - MAKE UP COIL CONNECTOR, PULL TEST 50K AND PRESSURE TEST 4,700 PSI, GOOD. PUMP SLACK FORWARD. 18:00 - 20:00 2.00 RIGID P 12,393 00 POST _ PUMP CAUSTIC SOLUTION AROUND SURFACE LINES AND THROUGH ALL THE PITS TO CLEAN THEM. PURGE REELAND SURFACE LINES WITH AIR. 20:00 - 00'.00 4.00 RIGID j 12,393.00 POST BHI INSTALL CABLE HEAD WHILE MEOH PUMP IS BEING SPOTTED TO PREP FOR LEAK TIGHT TEST OF SWAB AND MASTER VALVES. PERFORM LEAK TIGHT TEST ON SWAB AND MASTER VALVES, GOOD TEST. REMOVE BOP STACK AND MPD LINE. RIG RELEASED AT 23:59. Printed 8111/2017 10*09:35AM •AII depths reported in Drillers Depths' Daily Report of Well Operations 14-32A ACTIVITYnATF CI IMMAPV T/1/0= 0/0/0. RU CIW lubricator w/ CIW 6" J -plug TWC #423. Stabbed onto tree and ran down polish rod, tagging @135". Set and verified 0 psi . . Removed 6" CDR #01 upper tree. Installed upper 6" upper tree serial #120420846-04 . Torqued to API specs. RU CIW lubricator w/ pulling tool and stabbed onto tree and PT'd against the MV. Ran down and pulled the TWC. Installed tree cap and PT'd to 500 psi (PASSED) . Removed pit side IA 2" integral flange and replaced with tapped blind flange. PT'd to API specs. RDMO***Job 7/29/2017 Complete*** SEE LOG FOR DETAILS. Final T/I/0= 0/0/0. CTU #9 - 1.50" Coil Job Objective: RPM Log, Perforate MIRU. Make up 2.25" JSN drift BHA and RIH. Perform MIT -T to 2400 psi and lost 39 psi in 1 st 15 min, 17 psi in 2nd 15 min, pass. Tag TD at 12359' and able to jet down to 12366' CTMD. Paint red flag 50' off bottom at 12315', POOH. 7/30/2017 ...Continued on WSR 7-31-17... CTU #9 - 1.50" Coil ***Cont. from WSR 7-30-17*** Job Objective: RPM log, Perforate Make up RPM logging BHA with dual GR. RIH circulate SafeLube at min rate. Log up and down pass from 10,150' to TD at 20 fpm.Tagged TD @ 12363'E tag down 2k got wt back @ 12357', log up @ 20 FPM. to 10150, painted blue flag @ 12000.0', speed up to 40 FPM up to 9350' for a jewelry log. Tools came back w/ +8' correction, Corrected PBTD of 12367.81'. Make up Perf gun run #1 with 15' of 2.0" Maxforce, 6 spf pert guns and RIH. Tag PBTD for depth correction, confirmed by flag, and perforate 12266-12280'. POOH. Make up Perf gun run #2 with 25' of 2.0" Maxforce, 6 spf pert guns and RIH. 7/31/2017 ....Continued on WSR 8-1-17... CTU #9 - 1.50" CT ***Cont. from WSR 7-31-17*** Job Objective: RPM log, Perforate RIH with Perf gun run #2 with 25' of 2.0" Maxforce, 6 spf pert guns. Tag PBTD for depth correction, confirmed by flag, and then perforate 12025-12050'. POOH laying in FP from 2500'. RDMO CTU. 8/1/2017 ***Job Complete*** bp North America - ALASKA - BP Prudhoe Bay PB DS 14 14-32 14-32A 500292099901 Design: 14-32A Final Survey Report 26 July, 2017 BA ER 0 F IGHES BAT GE company N alp %'►NT by Final Survey Report BA UGHES 0' Site Position: Northing: GEf mES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-32 70° 14'26.346 N Project: Prudhoe Bay TVD Reference: KB @ 69.00usft (54: 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB C? 69.00usft (54 : , 32 8/5/1983 00:00) Well: 14-32 North Reference: True Wellbore: 14-32A Survey Calculation Method: Minimum Curvature _ _ 1.32 ° Design: 14-32A Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 •OGP-Usa AK [4267°15864] Using Well Reference Point Map Zone: NAD27 •OGP-Usa AK / Alaska zone 4 [26734.1586• Using geodetic scale factor Site PB DS 14, TR -10-14 Site Position: Northing: 5,939,577.430 usft Latitude: 70° 14'26.346 N From: Map Easting: 674,150.480 usft Longitude: 148'35'36.726W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: _ _ 1.32 ° Well 14-32, 14-32 -- - Well Position *NI -S 0.00 usft Northing: 5,940,378.685 usft Latitude: 70° 14'31997 N +EI -W 0.00 usft Easting: 675,147.602 usft Longitude: 148° 35' 7.205 W Position Uncertainty 0.00 usft Wellhead Elevation: 41.49 usft Ground Level: 39.29 usft Wellbore 14-32A - - --- Magnetics Model Name Sample Date Declination Dip Angle Field Strength I°I 1°I (nT) BGGM2016 8/1/2017 17.77 80.97 57,543 —. Design 1432A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,200.00 Vertical Section: Depth From (TVD) -NI-S aEl-W Direction (usft) (usft) (usft) (°) 27.51 0.00 000 350.00 7/26/2017 10.00:10AM Page 2 COMPASS 5000.1 Build 810 by Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Design: 14-32A Survey Program Date 7/25/2017 From To (usft) (usft) Survey(Wellbore) 100.00 10,200.00 SIGMA -Gyro (14-32) 10,225.00 12,351.41 BHI CTK MWD 4-1/4"(14-32A) Survey 27.51 BP BAKER Final Survey Report UGHES eGE- ,,,y Local Coordinate Reference: Well 14-32 TVD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) MD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Tool Name Description SRG Conventional SRG single shots MWD MWD -Standard MD Inc Azi (azimuth) ND TVDSS NIS ENV Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ('I100usf) 27.51 0.00 0.00 27.51 -41.49 0.00 0.00 5,940,378.685 675,147.602 0.00 100.00 0.30 115.50 100.00 31.00 -0.08 0.17 5,940,378.607 675,147.775 0,41 200.00 0.13 34.43 200.00 131.00 -0.10 0.47 5,940,378.595 675,148.076 0.31 300.00 0.52 138.60 300.00 231.00 -0.35 0.84 5,940,378.357 675,148.446 0.57 400.00 0.18 124.10 400.00 331.00 -0.78 1.27 5,940,377.939 675,148.886 0.35 500.00 0.25 109.93 500.00 431.00 -0.94 1.60 5,940,377.784 675,149.225 0.09 600.00 0.08 127.42 599.99 530.99 -1.06 1.86 5,940,377.673 675,149.488 0.18 700.00 0.23 147.33 699.99 630.99 -1.27 2.03 5,940,377.466 675,149.656 0.16 800.00 0.13 122.25 799.99 730.99 -1.50 2.23 5,940,377.241 675,149.866 0.13 900.00 0.45 127.00 899.99 830.99 -1.79 2.64 5,940,376.954 675,150.282 0.32 1,000.00 0.25 113.43 999.99 930.99 -2.12 3.15 5,940,376.643 675,150.803 0.22 1,100.00 0.57 118.83 1,099.99 1,030.99 -2.44 3.79 5,940,376.331 675,151.447 0.32 1,200.00 0.62 48.60 1,199.98 1,130.98 -2.32 483 5,940,376.469 675,152.285 0.69 1,300.00 0.98 98.80 1,299.97 1,230.97 -2.10 5.88 5,940,376.725 675,153.531 0.75 1,400.00 0.87 94.53 1,399.96 1,330.96 -2.29 7.48 5,940,376.571 675,155.136 0.13 1,500.00 1.03 98.93 1,499.95 1,430.95 -2.49 9.13 5,940,376.410 675,156.785 0.18 1,600.00 0.55 285.92 1,599.94 1,530.94 -2.50 9.55 5,940,376.412 675,157.212 1.58 1,700.00 0.55 127.43 1,699.94 1,630.94 -2.66 9.47 5,940,376.250 675,157.135 1.06 1,800.00 0.28 123.58 1,799.94 1,730.94 -3.08 10.06 5,940,375.837 675,157.729 0.27 1,900.00 0.27 210.42 1,899.94 1,830.94 -3.42 10.14 5,940,375.501 675,157.821 0.38 2,000.00 0.43 222.15 1,999.94 1,930.94 -3.90 9.77 5,940,375.011 675,157.462 0.17 0.00 -0.11 -0.18 -0.49 -0.98 -1.20 -1.36 -1.60 -1.86 -2.22 -263 -3.06 -3.09 -3.09 -3.55 -4.04 -4.12 -4.26 -4.78 -513 -554 7/2612017 10,00 f 0AM Page 3 COMPASS 5000.1 Build 810 BP h� yN� ^' Final Survey Report BAF�UGHES Erm ,, Company: North America -ALASKA -BP Local Co-ordinate Reference: Well 14-32 Project- Prudhoe Bay ND Reference: KB @ 69.00usft (54: 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB Q 69.00usft (54: 32 8/5/1983 00:00) Well: 1432 North Reference: True Wellbore: 14-32A Survey Calculation Method: Minimum Curvature Design: 14-32A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Aid(saimuth) ND TVDSS NIS ENII Northing Eas0ng DI -eq V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 2,100.00 0.50 239.85 2,099.93 2,030.93 4.40 9.14 5,940,374.499 675,156.844 0.16 -5.92 2,200.00 0.88 238.28 2,199.93 2,130.93 -5.02 8.11 5,940,373.852 675,155.829 0.38 -6.36 2,300.00 0.58 217.03 2,299.92 2,230.92 -5.83 7.15 5,940,373.023 575,154.890 0.40 -6.98 2,400.00 0.57 218.23 2,399.91 2,330.91 -6.63 6.54 5,940,372.214 675,154.296 0.02 -7.66 2,493.00 1.45 145.40 2,492.90 2,423.90 -7.96 6.93 5,940,370.889 675,154.710 1.50 -9.04 13 318" j 2,500.00 1.55 143.88 2,499.90 2,430.90 -8.11 7.03 5,940,370.742 675,154.819 1.50 -9.21 2,600.00 1.63 130.93 2,599.86 2,530.86 -10.13 8.90 5,940,368.762 675,156.738 0.37 -11.53 2,700.00 2.03 126.98 2,699.81 2,630.81 -12.13 11.39 5,940,366.824 675,159.273 0.42 -13.92 2,800.00 2.33 100.98 2,799.74 2,730.74 -13.58 14.80 5,940,365.451 675,162.716 1.02 -15.95 2,900.00 4.18 62.05 2,899.58 2,830.58 -12.26 20.02 5,940,366.893 675,167.899 2.78 -15.55 3,000.00 7.70 46.82 2,999.04 2,930.04 -5.97 28.13 5,940,373.374 675,175.858 3.83 -10.76 'i. 3,100.00 8.85 47.80 3,097.99 3,028.99 3.78 38.71 5,940,383.368 675,186.212 1.16 -2.99 3,200.00 10.83 51.83 3,196.55 3,127.55 14.65 51.66 5,940,394.534 675,198.906 1.91 546 3,300.00 13.20 52.58 3,294.39 3,225.39 2229 67.98 5,940,407.549 675,214.929 2.57 15.07 3,400.00 16.48 53.85 3,391.04 3,322.04 42.60 88.51 5,940,423.330 675,235.093 3.30 26.59 3,500.00 18.42 55.65 3,486.43 3,417.43 59.89 113.01 5,940,441A77 675,259.183 2.01 39.35 3,600.00 21.18 57.32 3,580.51 3,511.51 78.56 141.26 5,940,460.499 675,286.994 2.82 52.83 3,700.00 24.08 58.22 3,672.80 3,603.80 99.06 173.82 5,940,481.751 675,319.061 2.92 67.37 3,800.00 26.75 58.75 3,763.12 3,694.12 121.48 210.41 5,940,505.017 675,355.116 2.68 83.10 3,900.00 28.95 59.35 3,851.53 3,782.53 145.50 250.47 5,940,529.956 675,394.611 2.22 99.60 4,000.00 31.65 60.67 3,937.86 3,868.86 170.70 294.18 5,940,556.158 675,437.714 2.76 117.02 4,100.00 34.38 60.85 4,021.71 3,952.71 197.30 341.72 5,940,583.863 675,484.620 2.73 134.97 4,200.00 37.85 61.30 4,102.48 4,033.48 225.80 393.30 5,940,613.547 675,535.525 3.48 154.07 4,300.00 39.52 61.57 4,180.54 4,111.54 255.68 448.20 5,940,644.695 675,589.707 1.68 173.97 4,400.00 42.38 62.53 4,256.06 4,187.06 286.38 506.09 5,940,676.731 675,646.870 2.93 194.15 4,500.00 42.72 63.48 4,329.73 4,260.73 317.08 566.35 5,940,708.813 675,706.391 0.73 213.91 726/2017 1000:10AM Page 4 COMPASS 5000.1 Build 81D o� BP by SAT( ( y►�1r Final Survey Report UGHES mmp ny Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-32 Project: Prudhoe Bay TVD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB @ 69.00usft (54: 32 8/5/1983 00:00) Well: 14-32 North Reference: Tme Wellbore: 14-32A Survey Calculation Method: Minimum Curvature Design: 14-32A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS WS EMI Northing Easting 131.99 V. Sec (usft) (°) V) (usft) (usft) (usft) (usft) (usft) (usft) (°7100usfo (usft) 4,600.00 42.67 63.72 4,403.22 4,334.22 347.23 627.08 5,940,740.365 675,768.408 0.17 233.06 4,700.00 41.62 63.65 4,477.37 4,408.37 376.97 687.23 5,940,771.498 675,825.843 1.05 251.91 4,800.00 41.52 62.80 4,552.18 4,483.18 406.86 746.47 5,940,802.754 675,884.367 0.57 271.06 4,900.00 41.80 63.88 4,627.01 4,558.01 436.63 805.75 5,940,833.887 675,942.941 0.72 290.08 5,000.00 39.87 59.70 4,702.91 4,633.91 467.35 863.13 5,940,865.937 675,999.589 3.34 310.37 5,100.00 37.42 52.85 4,781.15 4,712.15 501.83 914.94 5,940,901.601 678,050.576 4.82 335.32 5,200.00 37.38 50.95 4,860.60 4,791.60 539.30 962.73 5,940,940.172 676,097.481 1.15 363.93 5,300.00 37.43 51.05 4,940.03 4,871.03 577.53 1,009.94 5,940,979.484 676,143.784 0.08 393.38 5,400.00 36.57 52.98 5,019.90 4,950.90 614.57 1,057.36 5,941,017.616 676,190.329 1.45 421.62 5,500.00 36.80 53.20 5,100.09 5,031.09 650.45 1,105.13 5,941,054.592 676,237.248 0.26 448.66 5,600.00 37.28 54.22 5,179.91 5,110.91 686.10 1,153.88 5,941,091.357 676,284.957 0.78 475.34 5,700.00 38.12 54.07 5,259.03 5,190.03 721.92 1,203.25 5,941,128.317 676,333.671 0.84 502.01 5,800.00 37.97 54.33 5,337.79 5,288.79 757.97 1,253.23 5,941,165.516 676,382.801 0.22 528.83 5,900.00 37.92 54.82 5,416.85 5,347.65 793.61 1,303.34 5,941,202.310 676,432.063 0.31 555.231 6,000.00 37.45 55.33 5,495.79 5,426.79 828.61 1,353.46 5,941,238.462 676,481.354 0.56 580.99 -- 6,100.00 37.48 55.92 5,575.16 5,506.16 862.95 1,403.66 5,941,273.960 676,530.743 0.36 606.10 6,200.00 37.57 55.77 5,654.47 5,585.47 897.15 1,454.07 5,941,309.317 676,580.337 0.13 631.02 6,300.00 37.47 55.95 5,733.78 5,664.78 931.33 1,504.47 5,941,344.657 676,629.934 0.15 65593 6,400.00 36.88 56.60 5,813.46 5,744.46 964.88 1,554.73 5,941,379.364 676,679.391 0.71 680.24 6,500.00 36.88 56.48 5,893.45 5,824.45 997.97 1,604.80 5,941,413.605 676,728.674 0.07 704.14 6,600.00 37.63 56.75 5,973.04 5,904.04 1,031.28 1,655.34 5,941,448.078 676,778.430 0.77 728.16 6,700.00 38.48 57.00 6,051.79 5,982.79 1,064.96 1,706.97 5,941,482.950 676,829.254 0.86 752.37 6,800.00 40.17 56.25 6,129.14 6,060.14 1,099.83 1,759.88 5,941,519.034 676,881.341 1.76 777.52 6,900.00 42.23 55.92 6,204.38 6,135.38 1,136.58 1,814.54 5,941,557.045 676,935.126 2.07 804.22 7,000.00 43.18 56.43 6,277.86 6,208.86 1,174.33 1,870.88 5,941,596.092 676,990.573 1.01 831.62 7,100.00 43.70 57.03 6,350.47 6,281.47 1,212.05 1,928.37 5,941,635.134 677,047.167 0.66 858.78 7,200.00_ _ 44.28 58.07 6,422.42 6,353.42 1,249.31 1,986.98 5,941,673.745 677,104.890 0.93 885.30 712612017 10:00:10AM Page 5 COMPASS 5000.1 Build BID 440 's., by BP BAKER �. Final Survey Report UGHES �N♦' GEom..w Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-32 Project: Prudhoe Bay TVD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB C 69.00usft (54: 32 8/5/1983 00:00) Well: 14-32 North Reference: True Wellbore : 14-32A Survey Calculation Method: Minimum Curvature Design: 14-32A Database: EDM R5K- Alaska PROD - ANCP11 Survey MD Inc Azi(azimuth) ND TVDSS NIS E/W Northing Basting DLep V. Sac lueftl (1 (`I (usft) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft) 7,300.00 44.80 58.58 6,493.69 6,424.69 1,286.14 2,046.67 5,941,711.949 677,163.707 0.63 91120 7,500.00 45.12 59.88 6,635.22 6,566.22 1,358.43 2,168.10 5,941,787.039 677,283.412 0.49 961.31 7,600.00 45.63 60.20 6,705.46 6,636.46 1,393.98 2,229.76 5,941,824.001 677,344.227 0.56 985.60 7,700.00 45.73 60.22 6,775.33 6,706.33 1,429.52 2,291.85 5,941,860.977 677,405.471 0.10 1,009.83 7,800.00 46.48 61.36 6,844.66 6,775.66 1,464.67 2,354.75 5,941,897.577 677,467.537 1.12 1,033.52 7,900.00 47.30 61.47 6,913.00 6,844.00 1,499.59 2,418.87 5,941,933.973 677,530.815 0.82 1,056.78 8,000.00 47.00 61.95 6,981.01 6,912.01 1,534.34 2,483.42 5,941,970.208 677,594.543 0.46 1,079.78 8,100.00 47.13 62.15 7,049.13 6,980.13 1,568.65 2,548.10 5,942,006.013 677,658.397 0.20 1,102.35 8,200.00 46.98 61.92 7,117.26 7,048.26 1,602.98 2,612.75 5,942,041.830 677,722.231 0.23 1,124.92 8,300.00 46.58 62.58 7,185.74 7,116.74 1,636.91 2,677.24 5,942,077.249 677,785.911 0.63 1,147.14 8,400.00 48.62 62.87 7,254.45 7,185.45 1,670.20 2,741.82 5,942,112.034 677,849.695 0.21 1,168.72 8,500.00 45.90 63.00 7,323.59 7,254.59 1,703.08 2,806.15 5,942,146.391 677,913.246 0.73 1,189.92 8,600.00 45.62 63.65 7,393.35 7,324.35 1,735.24 2,870.17 5,942,180.031 677,976.493 0.54 1,21048 8,700.00 44.70 63.53 7,463.87 7,394.87 1,766.78 2,933.68 5,942,213.034 678,039.246 0.92 1,230.51 8,800.00 43.60 64.30 7,535.62 7,466.62 1,797.41 2,996.23 5,942,245.107 678,101.069 1.22 1,249.81 8,900.00 42.83 64.50 7,608.49 7,539.49 1,827.00 3,057.98 5,942,276.119 678,162.111 0.78 1,266.23 9,000.00 41.32 64.50 7,682.72 7,613.72 1,855.84 3,118.46 5,942,306.363 678,221.902 1.51 1,286.13 9,100.00 40.10 66.02 7,756.52 7,689.52 1,883.15 3,177.69 5,942,335.033 678,280.475 1.57 1,302.74 9,200.00 36.60 67.12 7,835.85 7,766.85 1,908.37 3,235.86 5,942,361.595 678,338.039 1.65 1,317.47 9,300.00 36.78 68.08 7,914.98 7,845.98 1,931.67 3,292.38 5,942,386.207 678,393.997 'Al 1,330.61 9,400.00 35.00 69.08 7,995.99 7,926.99 1,953.09 3,346.95 5,942,408.686 678,448.047 1.87 1,342.23 9,500.00 33.45 70.43 8,078.67 8,009.67 1,972.56 3,399.71 5,942,429.578 678,500.337 1.73 1,352.24 9,600.00 32.08 70.63 8,162.76 8,093.76 1,990.60 3,450.73 5,942,448.798 678,550.924 1.37 1,361.15 9,700.00 30.62 70.77 8,248.16 8,179.16 2,007.60 3,499.83 5,942,467.129 678,599.609 1.46 1,369.56 9,800.00 28.78 72.55 8,335.02 8,266.02 2,023.41 3,548.85 5,942,483.624 678,646.246 2.04 1,376.77 9,900.00 27.03 73.80 8,423.39 8,354.39 2,036.97 3,591.63 5,942,498.420 678,690.705 1.85 1,382.34 10,000.00 25.73 74.33 8,512.98 8,443.98 2,049.17 3,634.36 5,942,511.611 678,733.130 1.32 1,386.941 72672017 10:00: 10AM Page 6 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Design: 14-32A Survey (usft) MD Inc lust) 1°I 10,088.00 24.89 95181, DLeg loloo00 24.78 10,200.00 24.68 TIP (usft) 10,225.00 24.60 KOP-WS 10,258.14 Interpolated Azimuth 10,290.04 Interpolated Azimuth 10,320.32 Interpolated Azimuth 10,353.05 10,380.44 10,413.30 10,440.48 10,470.02 10,500.98 10,529.92 10,561.91 10,591.08 10,620.61 10,650.51 10,679.87 10,710.06 10,739.95 10,774.16 BP Final Survey Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: BA ER F�UGHES Pant Well 14-32 KB @ 69.00usft (54: 32 8/5/1983 00:00) KB @ 69.00usft (54: 32 8/5/1983 00:00) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Azi(azimuth) TVD TVDSS N/S E/W Northing Easdng DLeg V. Sec 1°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usR) (usft) 74.54 8,592.53 8,523.53 2,059.27 3,670.60 5,942,522.547 678,769.126 0.96 1,390.59 74.57 8,603.42 8,534.42 2,060.61 3,675.46 5,942,524.001 678,773.952 0.96 1,391.07 72.45 8,694.25 8,625.25 2,072.48 3,715.57 5,942,536.801 678,813.771 0.89 1,395.79 72.69 8,716.97 8,647.97 2,075.60 3,725.51 5,942,540.153 678,823.640 0.51 1,397.14 28.45 72.50 8,746.82 8,677.62 2,080.03 3,739.63 5,942,544.907 678,837.653 11.61 1,399.05 38.75 71.00 8,773.15 8,704.15 2,085.58 3,756.36 5,942,550.844 678,854.250 32.39 1,401.61 48.01 66.00 8,795.14 8,726.14 2,093.26 3,775.65 5,942,558.971 678,873.353 32.60 1,405.83 57.54 60.68 8,814.93 8,745.93 2,105.00 3,798.87 5,942,571.248 678,896.288 31.85 1,413.36 66.29 60.04 8,827.81 8,758.81 2,116.95 3,819.85 5,942,583.675 678,916.983 32.01 1,421.48 77.34 60.16 8,838.05 8,769.05 2,132.48 3,846.87 5,942,599.835 678,943.635 33.63 1,432.09 87.82 59.12 8,841.55 8,772.55 2,146.09 3,870.09 5,942,613.976 678,966.533 38.74 1,441.45 91.93 51.72 8,841.62 8,772.62 2,162.84 3,894.39 5,942,631.285 678,990.435 28.65 1,453.73 91.04 40.14 8,840.81 8,771.81 2,184.33 3,916.59 5,942,653.284 679,012.126 37.50 1,471.04 91.20 29.56 8,840.25 8,771.25 2,208.04 3,933.10 5,942,677.371 679,028.080 36.56 1,491.52 90.12 16.89 8,839.88 8,770.88 2,237.38 3,945.69 5,942,706.989 679,039.983 39.75 1,518.23 90.95 7.06 8,839.60 8,770.60 2,265.88 3,951.73 5,942,735.619 679,045.363 33.82 1,545.241 92.12 358.07 8,838.81 8,769.81 2,295.34 3,953.05 5,942,765.098 679,045.999 30.69 1,574.02 92.30 347.71 8,837.65 8,768.65 2,324.94 3,949.36 5,942,794.610 679,041.619 34.63 1,603.82 91.04 339.09 8,836.80 8,767.80 2,353.04 3,940.98 5,942,822.503 679,032.592 29.66 1,632.95 90.40 330.53 8,836.42 8,767.42 2,380.33 3,928.15 5,942,849.487 679,019.126 28.43 1,662.05 92.58 327.96 8,835.64 8,766.64 2,406.01 3,912.87 5,942,874.798 679,003.257 11.27 1,689.99 93.07 _ 322.98 8,833.95 8,764.95 2,434.15 3,893.51 5,942,902.479 678,983.248 14.61 1,721.07 712 61201 7 1 0:00: FOAM Page 7 COMPASS 5000.1 Build 81D i}BP Inc Azi (azimuth) ND by Final Survey Report ENV BAFUGMES Easting DLeg V. Sec I (usft) (°) Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-32 (usft) Project: Prudhoe Bay TVD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB Q 69.00usft (54 : 32 8/5/1983 00:00) Well: 14-32 North Reference: True 3,876.65 Wellbore: 14-32A Survey Calculation Method: Minimum Curvature 1746.94 Design: 14-32A Database: EDM R5K - Alaska PROD - ANCP1 Survey_ MD Inc Azi (azimuth) ND NDSB NIS ENV Northing Easting DLeg V. Sec I (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100uaft) (usft) 10,802.95 92.30 325.26 8,832.60 8,763.60 2,457.45 3,876.65 5,942,925.379 678,965.859 8.35 1746.94 10,832.68 88.99 322.05 8,832.27 8,763.27 2,481.38 3,859.04 5,942,948.900 678,947.695 15.51 1,773.57 10,861.70 87.65 326.00 8,833.07 8,784.07 2,504.85 3,842.00 5,942,971.967 678,930.118 14.16 1,799.64 10,890.60 88.19 330.23 8,834.07 8,765.07 2,529.37 3,826.75 5,942,996.124 678,914.301 14.68 1,826.44 10,929.32 90.12 338.64 8,834.64 8,765.64 2,564.27 3,810.06 5,943,030.617 678,896.805 22.28 1,863.70 10,949.98 90.18 339.14 8,834.59 8,765.59 2,583.54 3,802.62 5,943,049.711 678,888.919 2.44 1,883.97 10,976.02 90.28 343.56 8,834.48 8,765.48 2,608.21 3,794.29 5,943,074.175 678,880.023 16.98 1,909.71 11,000.44 90.61 344.94 8,834.29 8,765.29 2,631.71 3,787.66 5,943,097.515 678,872.851 5.81 1,934.01 11,030.22 85.45 342.84 8,835.32 6,766.32 2,660.29 3,779.41 5,943,125.897 678,863.935 18.70 1,983.581 11,060.16 83.82 340.49 8,838.12 8,769.12 2,688.58 3,770.04 5,943,153.962 678,853.906 9.52 1,993.06 11,092.14 80.25 339.62 8,842.55 8,773.55 2,718.35 3,759.23 5,943,183468 678,842.417 11.48 2,024.27 11,120.19 77.86 339.40 8,847.87 8,778.87 2,744.15 3,749.60 5,943,209.031 678,832.182 8.56 2,051.35 11,149.92 74.18 337.76 8,855.05 8,786.05 2,771.00 3,739.06 5,943,235.630 678,821.031 13.49 2,079.62 11,180.08 71.21 336.41 8,864.02 8,795.02 2,797.52 3,727.86 5,943,261.880 678,809.211 10.73 2,107.68 11,217.25 73.03 331.87 8,875.44 8,806.44 2,829.34 3,712.43 5,943,293.329 678,793.046 12.61 2,141.70 11,247.22 72.53 327.51 8,884.32 8,815.32 2,854.04 3,697.98 5,943,317.693 678,778.035 14.00 2,168.54 11,271.63 73.44 325.37 8,891.46 8,822.46 2,873.49 3,685.08 5,943,336.835 678,764.684 9.17 2,189.93 11,300.35 73.85 321.12 8899.55 8,830.55 2,895.56 3,668.59 5,943,358.517 678,747.690 14.27 2,214.53 11,330.49 73.34 320.01 8,908.06 8,839.06 2,917.90 3,650.23 5,943,380.414 678,728.812 3.92 2,239.71 11,361.25 72.53 315.88 8,917.09 8,848.09 2,939.73 3,830.54 5,943,401.779 678,708.621 13.10 2,264.63 11,391.02 72.29 314.45 8,926.09 8,857.09 2,959.85 3,610.53 5,943,421.430 678,688.153 4.65 2,287.92 11,425.54 71.24 318.86 8,936.90 8,867.90 2,983.68 3,588.03 5,943,444.733 678,665.107 12.51 2,315.30 11,450.74 71.71 323.26 8,944.91 8,875.91 3,002.26 3,573.02 5,943,462.958 678,649.668 16.66 2,336.20 11,480.90 71.77 327.00 8,954.36 8,885.36 3,025.76 3,556.65 5,943,486.064 678,632.756 11.78 2,362.18 11,510.87 73.90 330.20 8,963.21 8,894.21 3,050.20 3,541.74 5,943,510.148 678,617.281 12.43 2,388.84 11,541.97 77.88 332.68 8,970.79 8,901.79 3,076.68 3,527.33 5,943,536.291 678,602.260 14.95 2,417.43 11,571.30 80.48 335.04 8,976.29 8,907.29 3,102.54 3,514.64 5,943,561.847 678,588.976 11.88 2,445.10 7126/2017 10:00: 10AM Page 6 COMPASS 5000.1 Build 81D b BP A ` Op B Final Survey Report YER GHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1432 Project Prudhoe Bay ND Reference: KB @ 69.00usft (54: 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB @ 69,00usft (54: 32 8/5/1983 00:00) Well: 1432 North Reference: True Wellbore: 14-32A Survey Calculation Method: Minimum Curvature Design: 14-32A Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc Azi (azimuth) ND NDSS NIS ENV Northing Easting DLeg V. Sec (usft) 1°I I°I (usft) (usft) (usft) (usft)usR 1 1 (usft) ('1100usft) (usft) 11,600.82 81.48 338.16 8,980.92 8,911.92 3,129.29 3,503.06 5,943,588.322 678,576.782 10.97 2,47345 11,630.75 82.51 342.47 8,985.09 6,916.09 3,157.19 3,493.08 5,943,615.981 678,566.157 14.67 2,502.66 11,665.88 82.04 346.84 8,989.82 8,920.82 3,190.76 3,463.87 5,943,649.317 678,556.170 12.40 2,537.31 11,692.61 85.11 346.47 8,992.83 8,923.83 3,216.79 3,477.69 5,943,675.200 678,549.391 11.48 2,564.02 11,720.88 88.52 347.87 8,994.39 8,925.39 3,244.11 3,471.47 5,943,702.368 678,542.536 13.13 2,592.01 11,750.87 92.03 347.01 8,994.25 8,925.25 3,273.38 3,464.95 5,943,731.474 678,535.338 12.05 2,621.97 11,780.78 96.64 349.60 8,991.99 8,922.99 3,302.57 3,458.91 5,943,760.518 678,528.616 17.67 2,651.77 11,810.56 99.50 345.31 8,987.80 8,918.80 3,331.35 3,452.51 5,943,789.132 678,521.552 17.19 2,681.21 11,843.16 100.56 342.64 8,982.13 8,913.13 3,362.20 3,443.65 5,943,819.767 678,511.978 8.70 2,713.13 11,874.62 100.31 339.14 8,976.43 8,907.43 3,391.43 3,433.52 5,943,848.752 678,501.175 10.97 2,743.68 11,906.66 100.65 334.43 8,970.59 8,901.59 3,420.37 3,421.11 5,943,877.400 678,488.092 14.49 2,774.34 11,930.64 101.04 332.38 8,966.08 8,897.08 3,441.43 3,410.56 5,943,898.206 678,477.063 8.55 2,796.91 11,960.73 100.53 329.88 8,960.45 8,891.45 3,467.31 3,398.29 5,943,923.748 678,462.196 8.34 2,824.88 11,990.66 99.10 327.35 8,955.35 8,886.35 3,492.49 3,380.93 5,943,948.556 678,446.258 9.60 2,852.34 12,024.26 97.39 332.69 8,950.53 8,881.53 3,521.28 3,364.33 5,943,976.954 678,428.988 16.53 2,883.58 12,051.56 99.29 336.12 8,946.57 8,877.57 3,545.64 3,352.66 5,944,001.030 678,416.757 14.25 2,909.59 12,080.93 100.13 342.83 8,941.61 8,872.61 3,572.73 3,342.51 5,944,027.879 678,405.985 22.70 2,938.03 12,114.26 99.84 345.24 Q935.83 8,866.83 3,604.29 3,333.49 5,944,059.216 678,396.228 7.17 2,970.68 12,140.60 100.17 349.62 8,931.25 8,862.25 3,629.60 3,327.84 5,944,084.387 678,389.997 16.42 2,996.58 12,170.66 100.07 345.80 8,925.96 8,856.96 3,658.51 3,321.54 5,944,113.139 678,383.030 12.51 3,026.15 1i 12,201.58 100.89 342.69 8,920.34 8,851.34 3,687.76 3,313.29 5,944,142.196 678,374.099 10.24 3,056.39 12,234.23 101.24 340.52 8,914.07 8,845.07 3,718.17 3,303.18 5,944,172.355 678,363.286 6.61 3,088.09 1 12,266.46 101.14 336.49 8,907.82 8,838.82 3,747.58 3,291.60 5,944,201.487 678,351.023 12.27 3,119.07 12,290.11 101.89 334.20 8,903.09 8,834.09 3,768.64 3,281.93 5,944,222.316 678,340.871 10.00 3,14148 12,321.10 99.98 331.56 8,897.21 8,828.21 3,795.72 3,268.06 5,944,249.062 678,326.376 10.39 3,170.56 12,351.41 - 99.02 328.35 8,892.21 8,623.21 3,821.59 3,253.09 5,944,274.578 678,310.814 10.91 3,198.64 726/2017 10:00: 10AM Page 9 COMPASS 5000.1 Build 81D x'44 r bp "00+0 Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Design: 14-32A Survey MD Inc Azi (azimuth) (usft) (1) (1 12,393.00 99.02 328.35 Projection to TD .2-7/8" 12,393.00 8,885.69 2-7/8" Design Annotations Measured Vertical Depth Depth (usft) (usft) 10,200.00 8,694.25 10,225.00 8,716.97 10,258.14 8,746.62 10,290.04 8,773.15 10,320.32 8,795.14 12,393.00 8,885.69 BP BA ER Final Survey Report Is UGHES GEc meant' Local Co-ordinate Reference: Well 14-32 +N/ -S TVD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) MD Reference: KB @ 69.00usft (54: 32 8/5/1983 00:00) North Reference: True 2,075.60 Survey Calculation Method: Minimum Curvature 2,080.03 Database: EDM R5K - Alaska PROD - ANCP1 TVD TVDSS NIS ENV Northing Easting DLeg (usft) (usft) (usft) (usft) (usft) (usft) (°1100usfo 8,885.69 8,816.69 3,856.56 3,231.54 5,944,309.032 678,288.455 0.00 2.875 4.250 Local Coordinates +N/ -S +EI -W (usft) (usft) Comment 2,072.48 3,715.57 TIP 2,075.60 3,725.51 KOP-WS 2,080.03 3,739.63 Interpolated Azimuth 2,085.58 3,756.36 Interpolated Azimuth 2,093.26 3,775.65 Interpolated Azimuth 3,856.56 3,231.54 Projection to TO Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes a GE Company V. Sec (usft) 3,236.82 726/2017 10.00.10AM Page 10 COMPASS 5000.1 Build 81D PnJttt PrvChoe Oay x ui e^j'-IMOREDETAIL5: 10.91N IIF}FAFIDFI6GOMICN 94e'. PB DS 14 coaerxlR[I eebesa: W61K1xT wal: tux s ~ �� ta92a vne�49uo19.we..: �eeumu, Wellhore: 16]iA y� �� SmOmry9lBmverce 9a' Parem Wellhom'. 1494 ry04N.i Oeal9n: t4axA ltuvl4]xAl unaaw.mi Te on MD: 10400.00 Dmr<D o.�xBeMe B®5�8 �i POST DRILLING bp BArR ES Easting (250 usft/in) /BOO GCC Report Easting (2.50 usftlin) 5944150 5944590 5944500 5940250 14-03114-03 id -32114-32A 594!250 5944900: 14-32A A(>TOAl moo 5944000 5943150 14-03/14-03A 14-33/14-33A 74-33/14-33A 5943150 5943509 : o 5943500 5943250 6000 �m 5943250 5943090 14 41/14-41 14-31/14-31 m 5943000 F5942750 O 800 a X5962]50 gODU 0 2000 Z 5942500 C 9000 o 1432/14-32 0S 14-33114.33 5W2500 5942250 0 0 . 8000 o 0 14-34N 5942250N 4-34PB2 5912W0� : L 0000 o. 5942000 5941150 14-43/14-43 60 00 %! � ' B w 5961150 C .7000 5961509 o, Sopv oo 59415DO 5941250 �000 0 a a o 5941250 5941000 �� 5000 PpOp 0., 0 590000 5949150: ^o o0 0 594W50 5940500- U0 a o %4D500 5940250 14-34114 34 o14-34I1434PB1 14-35714-35 5940000- o 15940000 5939150. .0000 5939150 593950D'' w a m m_ m P.. m- d m m ,.. m q m- mmm �.... �.. m m _ m u w w > n > m v m v m v m r m m w a .5939500 Easting (250 usft/in) /BOO GCC Report � 10 Z'= 1 �b p POST DRILLING North America - ALASKA - BP Prudhoe Bay PB DS 14 14-32 14-32A 14-32A AOGCC Post Drilling Offset Report 27 July, 2017 BA ER 0 F IGHES BAT GE company AOGCC Rapan -a►N�BP t,� by Anticollisiion Report BAJUGHES "►1 crmmwm Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-32 Well Error: 0.00usft Reference Wellbore 14-32A Reference Design: 14-32A Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output entire are at Database: Offset TVD Reference: Well 14-32 KB @ 69.00usft (54 : 32 8/5/1963 00:00) KB @ 69.00usft (54 : 32 6/5/1983 00:00) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 14-32A Fihertype: NO GLOBAL FILTER: Using user defined selection & filtering criteria WARNING: There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 7/25/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,200.00 SIGMA-Gym(14-32)SRG Conventional SRG single shots 10,225.00 12,351 Al BHI CTK MWO(14-32A) MWD MWD -Standard Summary Reference Offset Centre to NO-GO Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB DS 14 14-03-14-03-14.03 5,901.50 6,500.00 390.87 530.78 -114.60 FAIL - Major Risk 14 -03 -14 -03A -14-03A 12,134.94 11,650.00 170.59 994.37 -787.73 FAIL - Major Risk 14-31 - 14-31 - 14-31 2,423.78 2,425.00 119.20 39.06 80.16 Pass - Major Risk 14-32-14-32-14-32 10,500.00 10,825.00 423.04 42.29 409.30 Pass - Major Risk 14-33 - 14-33 - 14-33 2,020.19 2,025.00 87.23 29.70 57.54 Pass - Major Risk 14-33 - 14-33A - 14-33A 2,020.19 2,025.00 87.23 29.70 57.54 Pass - Major Risk 14-33 - 14-33A - Plan 8 2,020.19 2,025.00 87.23 29.70 57.54 Pass - Major Risk 14-34 - 14-34 - 14-34 2,047.97 2,050.00 244.09 36.02 208.13 Pass - Major Risk 14-34-14-34PB1-14-34PB1 2,047.97 2,050.00 244.09 36.02 208.13 Pass - Major Risk 14-34 - 14-34PB2- 14-34PB2 2,047.97 2,050.00 244.09 36.02 208.13 Pass- Major Risk 14-35 - 14-35 -14-35 2,893.39 2,900.00 355.37 46.02 309.53 Pass - Major Risk 14-41 - 14-41 - 14-41 3,375.00 3,375.00 203.88 51.64 152.40 Pass - Major Risk 14-43 - 1443 .14-43 2,844.73 2,850.00 67.78 41.53 26.36 Pass - Major Risk 7/27/2017 320:50PM COMPASS 5000.1 Build 81D 1_ BP BA,�(ER (.� Anticollision Report YER A�" m�M Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-32 Well Error: 0.00usft Reference Wellbore 14-32A Reference Design: 14-32A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 1432 KB @ 69.00usft (54: 32 8/5/1983 00:00) KB @ 69.00usft (54: 32 8/5/1983 00:00) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to KB @ 69.00usft (54 : 32 8/5/1983 Coordinates are relative to: 14-32 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27. OGP-UN AK Centel Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.33° 7/272017 3:2050PM Page COMPASS 5000.1 Build 81D Printed 8/24/2017 2:17:05PM North America -ALASKA - BP Page 1 of 2 Cementing Report Project: Prudhoe Bay —_ __ - 1 - Site: PB DS 14 Report no.: 1 Report date: 7/2a/2017 - �_--- - _ _ &enType: COM- ONSHORE (CON) _- _ Spud Date/Time: 815/1983 - - Contractor Conir for ALASKA DRILLING INC. Start Date: 7/26/2017Date,------ I tntl 7/28/2017 - --- AFE No.: - oruur U5A00000829 000008 Rig Name/No.: CDR -2 Rig Release: 7/28/2017 X3 -o_ 18HR-C: (991,343.19 ) Active datum: KB @89.00usft (above Mean Sea Level) ---� _- --- - — - — - - - - . General Inlom allon Job type: Primary Cement Company: SCHLUMBERGER Cement job start date/time'. 7/28/2017 4:30AM Job end date/time: 7/28/2017 B:OOAM Cemented String: PRODUCTION LINER 1 String Size. Cementer WAUGH 2.875 (in) String Set TMD: 12,393.00 (usft) Hole Size: 4.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM. Rotating Torque (iniVavg/max): (ft-lbf) Reciprocating Time (Start -End): Recti Drag Up/Down: - (kip) SPM'. Stroke Length: Fluid Name: CEMENT Fluids (i of 1) Slurry Type'. CEMENT Purpose. PRIMARY Yield: Class: G -CLASS Description: LEAD SLURRY Density: 15.30 (PP9) 1.3100 (ft /sk) Mix Water Ratio: 6.105 (gagsk94) Excess: Mix Method: Sacks Used: 136.50 (941b sacks) Water Volume: 19.8 (bbl) Excess Slurry Volume: BATCH 0.0 (bbl) Density Other Volume: Total Vol in Well: 25.9 (bbl) Measured by: DENSOMETER Slurry Volume: 31.8 (bbl) Excess Measured From: Mud Type: Gels 10 Sec: Density: 9.00 (ppg) PV: 6.00 (cp) YP: 34.000 (IbH100ft) Viscosity: 52.00 (s/qt) 22.000 (Ibf/100ft� Gels 10 Min: 26.000 (11;000fP) Additive!- Amount Units Name Type D047 ANTIFOAM AGENT Concentration Unit 0065 DISPERSANT 0.200 GAL/SX D187 FLUID LOSS 1.300 %BWOC DBOOG GAS BLOCK 0.100 %BWOC D763 CEMENT 1.500 GAL/SX D800 RETARDER AID 5.000 %SWOC 0.050 %BWOC - 7.. ..i,. Fluid Tests Thick time Thick (hr) temp. Free water (%) Free water Fluid loss temp. Fluid loss Fluid loss Comp Comp Comp Camp Comp Strength Comp Strength PF) (=130min) ('F) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (psi) Time i Pressure 1 Temperature 1 2 (psi) (^F) 5.78 0.00 80.00 36.0 min (psi)(°F) 180.00 11000.00 (min) Printed 8/24/2017 2:17:05PM Printed 8/24/2017 2'.17:05PM North America -ALASKA - BP""-"" Page 2 of 2 Cementing Common Well Name. 14-32 / 01 Report no. I Report date: 7/28/M17Project Prudhoe Bay _. __ _— ._ _. Site: PB DS 14 - - -- ._ Spud Date/Time: e/5/1983 NS Event Type: COM- ONSHORE (CON) —_. SiertDate: 7/26/2017 End Date: 7/28/2017 __ AFEi No.: -- Contractor: NABORS ALASKA DRILLING INC. - - Rig Name/No.: CDR -2 Rig Release: 7/28/2017 X3-O18HR-C: (991,343.19) BPUOI: USA00000828 _ ACOvedatum: KB �eg.00usft (above Mean Sea Level) --- -- - _ - - Stage Stage Type Est. Top Est. Bottom Mud Cim. Mud Circ. Top Bottom Plug Pressure Float Pressure Returns Circulate Cmt Vol to Total An no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped Held Hew Prior Surface Mud Lost Flow ( ipm) (psi) (Psi) (min) (hr) (bbl) (bbl) After 1 PRIMARY CEMENT 9,476.00 12,393.001 Y Pumping Schedule - Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Stan Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bin static Pumped Disp. Rate TMD TMD Pmp date/time 1°b Used temp. temp. (bhq Rate (bbUmin) (usft) (usft) bbl/min (scf) Tests Casing Test Shoe Test Liner Top Test Test Pressure: (psi) FIT/LOT: (Ppg) Liner Overlap. (usft Time: (min) Tool: N Positive Test: (Ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test (Ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N LoglSurvey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure. (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 8/24/2017 2'.17:05PM Originated: Schlumberger PTS- PRINT CENTER 6411 A Street RECEIVED AUG 15 2017 Anchorage, AK 99518 AOGCC (907)273-1700 main (907)273-4760fax Delivered to: MakanaK Bender Natul Resou rarces Technician II Alaska Oil & Gas Conservation Commission 333 W T' Ave. Suite 100 Anchorage. AK 99501 t: 28 0 TRANSMITTALOATE TRANSMITTAL# DATA LOGGED M.K.BENDER WELL NAME 09-03A API # 50-029-20209-01 SE ER D69W-00126 1 k&FIELD NAME PRUDHOE BAY SERVICE DESCRIPTION DELIVERABLE Memory I DESCRIPTION PPROF DATA TYPE FINAL FIELD DATELOGGED 27 -Mar -17 COLOR PRINTS 1 CDs 1 NK -14B 50-029-22668.02 DTBP-00002 NIAKUK WL Cement Eval. USI FINAL FIELD 9 -Apr -17 1 1 11-22A 50-029-22035-01 DQMD-00008 PRUDHOE BAY Memory SCMT FINAL FIELD 3 -May -17 1 1 11-18 50-029-21607-00 DODJ-00051 PRUDHOE BAY WL PPROF Rev3 FINAL FIELD 25 -May -17 1 1 09-05A 50-029-20215-01 DTBP-00015 PRUDHOE BAY WL PPROF Rev1 FINAL FIELD 13 -Jun -17 1 1 C -11B 50-029-20382-02 DQMD-00011 PRUDHOE BAY Memory SCMT FINAL FIELD 3 -Jul -17 1 1 C -07A 50.029-20128-01 DTBP-00020 PRUDHOE BAY WL SCMT Rev1 FINAL FIELD 5 -Jul -17 1 1 N-27 50-029-23365.00 DODJ-00064 PRUDHOE BAY WL IPROF Revl FINAL FIELD 14 -Jul -17 2 1 14.32A 50-029-20999.01 DQUJ-00012 PRUDHOE BAY WL Thrubit FINAL FIELD 25 -Jul -17 1 1 Transmittal Receipt A Transmittal Receipt signature confirms that a package (box, � ]/j // }� envelope, etc.) has been received and the contents of the X A / /, tom 0 J D411ic � package have been verified to match the media noted above. The Print Name Si ature Date specific content of the CDs and/or hardcopy prints may or may Please send signed transmittal to BP via email or post. not have been verified for correctness or quality level at this gancodc@bo.com point. BP PDC 1112-1, 900 E Benson Blvd, Anchorage, AK 99508 21 7082 BA BAT ER CD/DVD FINAL 2111, F�t IGHES PRINT DISTRIBUTION LIST REPORT LOGS GE COm Pany (Compass) Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska I2M # OF COPIES Exploration (Alaska) Inc. I# OF COPIES E ElVE trotechnical Data Center, 1-112-1 DATA LOGGED WELL NAME 14-32A 900 E. Benson Blvd. 8 /t4/2011 m K. BENDER AUG U 7 2017 Anchorage, Alaska 99505 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY_ PRUDHOEBAY A0 GCC LOG TYPE GR - RES BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(o_bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 90X) PERSON ATTENTION V BP North Slope. EOA, PBOC, PR&20(Offce 109) D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AN 99510 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street. Suite 505 Anchorage, AK 99503 Irn LOG DATE June 24, 2017 TODAYS DATE August 3, 2017 Revision Details: Rev. Requested by: --- FIELD/ FINAL CD/DVD FINAL PRELIM LOGS Pas, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Suryeys) (Compass) # OF PRINTS9 ur MIN # OF COPIES I# OF COPIES I# OF COPIES 4 4 4 4 4 4 0 0 1 1 0 01 01 1 10 0 4 State of Alaska -AOGCC 0 1 1 1 0 Attn: Makana Bender ,333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5IDNR- Division efOil & Gas *** 0 0 1 1 0 (Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 ** Stamp "confidential" on all material deliver to ON'R 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 Attn: Behrooz Raessi 0 1 0 1 0 1 0 10 TOTALS FOR THIS PAGE: 0 2 4 4 0 Obp RECEIVED AUG 0 7 2017 AOGCC North America - ALASKA - BP Prudhoe Bay PB DS 14 14-32 14-32A 500292099901 Design: 14-32A Final Survey Report 26 July, 2017 BAI- IGHES a GE company 21 7082 28470 BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BAER ES ccc mwro Well 14-32 KB @ 69.00usft (54 : 32 8/5/1983 00:00) KB @ 69.00usft (54 : 32 8/5/1983 00:00) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NA027 `OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4[26734'1586, Using geodetic scale factor Site PB DS 14, TR -10-14 '%0*J by Latitude: From: Map Position Uncertainty: Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Design: 14-32A BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BAER ES ccc mwro Well 14-32 KB @ 69.00usft (54 : 32 8/5/1983 00:00) KB @ 69.00usft (54 : 32 8/5/1983 00:00) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NA027 `OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4[26734'1586, Using geodetic scale factor Site PB DS 14, TR -10-14 Site Position: Latitude: From: Map Position Uncertainty: 0.00 usft usft Longitude: Web 14-32, 14-32 Well Position +WS 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore 14-32A Magnetics Model Name Sample Date BGGM2016 8/1/2017 Audit Notes: Version: Vertical Section: Phase: Depth From (TVD) (usft) 27.51 Northing: Easting: Slot Radius Northing: Easting: Wellhead Elevation: 5:939,577.430 usft Latitude: 70' 14'26.346 N 674;150.480 usft Longitude: 148' 35'36.726 W 0.000 in Grid Convergence: 1.32 ° 5,940,378.685 usft 675,147.602 usft 41.49 usft Declination Dip Angle 17.77 80.97 ACTUAL +N/ -S (usft) 0.00 Tie On Depth: +E/ -W (usft) 0.00 Field Strength (n T) 57,543 10,200.00 Direction 350.00 Latitude: 70' 14' 33.997 N Longitude: 148° 35'7.205 W Ground Level: 39.29 usft 712612017 10,00. Page 2 COMPASS 5000.1 Build 81D BP 1040-- by Final Survey Report BAJUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-32 Project: Prudhoe Bay TVD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) Well: 14-32 North Reference: True Wellbore: 14-32A Survey Calculation Method: Minimum Curvature Design: 14-32A Database: EDM R5K - Alaska PROD - ANCP 1 Survey Program Date 7/25/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description - 100.00 10,200.00 SIGMA-Gym(14-32)SRG Conventional SRG single shots 10,225.00 12,351.41 BHI CTK MWD 4-1/4"(14-32A) MWD MWD - Standard - Survey MD Inc AS (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) 0 11 just[) (usft) just) just) (usft) (usft) (°/100usft) (usft) 27.51 0.00 0.00 27.51 -41.49 0.00 0.00 5,940,378.685 675,147.602 0.00 0.00 100.00 0.30 115.50 100.00 31.00 -0.08 0.17 5,940,378.607 675,147.775 0.41 -0.11 200.00 0.13 34.43 200.00 131.00 -0.10 0.47 5,940,378.595 675,148.076 0.31 -0.18 300.00 0.52 136.60 300.00 231.00 -0.35 0.84 5,940,378.357 675,148.446 0.57 -0.49 400.00 0.18 124.10 400.00 331.00 -0.78 1.27 5,940,377.939 675,148.886 0.35 -0.98 500.00 0.25 109.93 500.00 431.00 -0.94 1.60 5,940,377.784 675,149.225 0.09 -1.20 600.00 0.08 127.42 599.99 530.99 -1.06 1.86 5,940,377.673 675,149.488 0.18 -1.36 700.00 0.23 147.33 699.99 630.99 -1.27 2.03 5,940,377.466 675,149.656 0.16 -1.60 800.00 0.13 122.25 799.89 730.99 -1.50 2.23 5,940,377.241 675,149.866 0.13 -1.86 900.00 0.45 127.00 899.99 830.99 -1.79 2.64 5,940,376.954 675,150.282 0.32 -2.22-- 1.000.00 0.25 113.43 999.99 930.99 -2.12 3.15 5,940,376.643 675,150.803 0.22 -2.63 1,100.00 0.57 118.83 .1,099.99 1,030.99 -2.44 3.79 5,940,376.331 675,151.447 0.32 -3.06 1,200.00 0.62 48.60 1,199.98 1,130.98 -2.32 4.63 5,940,376.469 675,152.285 0.69 -3.09 1,300.00 0.98 98.80 1,299.97 1,230.97 -2.10 5.88 5,940,376.725 675,153.531 0.75 -3.09 1,400.00 0.87 94.53 1,399.96 1,330.96 -2.29 7.48 5,940,376.571 675,155.136 0.13 -3.55 1,500.00 1.03 98.93 1,499.95 1,430.95 -2.49 9.13 5,940,376.410 675,156.785 0.18 -4.04 1,600.00 0.55 285.92 1,599.94 1,530.94 -2.50 9.55 5,940,376.412 675,157.212 1.58 -4.12 1,700.00 0.55 127.43 1,699.94 1,630.94 -2.66 9.47 5,940,376.250 675,157.135 1.08 -4.26 1,800.00 0.28 123.58 1,799.94 1,730.94 -3.08 10.06 5,940,375.837 675,157.729 0.27 -4.78 1,900.00 0.27 210.42 1,899.94 1,830.94 -3.42 10.14 5,940,375.501 675,157.821 0.38 -5.13 2,000.00 0.43 222.15 1,999.94 1,930.94 -3.90 9.77 5,940,375.011 675,157.462 0.17 •5.54 712612017 10:00: 10AM - Page 3 COMPASS 5000.1 Build 81D Survey BP BAER Q Obp Final Survey Report F UGHES Company: Project: Site: North America - ALASKA -BP Prudhoe Bay PB DS 14 Local Coordinate Reference: ND Reference: MD Reference: Well 14-32 KB @ 69.00usft (54 KB @ 69.00usft (54 : 32 8/5/1983 00:00) : 32 8/5/1983 00:00) Well: 14-32 North Reference: True ENV Wellbore: 14-32A Survey Calculation Method: Minimum Curvature (usft) Design: 14-32A Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting OLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ("/100usft) (usft) 2,100.00 0.50 239.65 2,099.93 2,030.93 -4.40 9.14 5,940,374.499 675,156.844 0.16 -5.92 2,200.00 0.88 238.28 2,199.93 2,130.93 -5.02 8.11 5,940,373.852 675,155.829 0.38 -6.31 2,300.00 0.58 217.03 2,299.92 2,230.92 -5.63 7.15 5,940,373.023 675,154.890 0.40 -6.98 2,400.00 0.57 218.23 2,399.91 2,330.91 -6.63 6.54 5,940,372.214 675,154.296 0.02 -7.66 2,493.00 1.45 145.40 2,492.90 2,423.90 -7.96 6.93 5,940,370.889 675,154.710 1.50 -9.04 13 3/8" 2,500.00 1.55 143.88 2,499.90 2,430.90 -8.11 7.03 5,940,370.742 675,154.819 1.50 -9.21 2,600.00 1.63 130.93 2,599.86 2,530.86 -10.13 8.90 5,940,368.762 675,156.738 0.37 -11.53 2,700.00 2.03 126.98 2,699.81 2,630.81 -12.13 11.39 5,940,366.824 675,159.273 0.42 -13.92 2,800.00 2.33 100.98 2,799.74 2,730.74 -13.58 14.80 5,940,365.451 675,162.716 1.02 -15.95 2,900.00 4.18 62.05 2,899.58 2,830.58 -12.26 20.02 5,940,366.893 675,167.899 2.78 -15.55 3,000.00 7.70 46.82 2,999.04 2,930.04 -5.97 28.13 5,940,373.374 675,175.858 3.83 -10.76 3,100.00 8.85 47.80 3,097.99 3,028.99 3.78 38.71 5,940,383.368 675,186.212 1.16 -2.99 3,200.00 10.63 51.83 3,196.55 3,127.55 14.65 51.66 5,940,394.534 675,198.906 1.91 5.46 3,300.00 13.20 52.58 3,294.39 3,225.39 27.29 67.98 5,940,407.549 675,214.929 2.57 15.07 3,400.00 16.48 53.85 .3,391.04 3,322.04 42.60 88.51 5,940,423.330 675,235.093 3.30 26.59 3,500.00 18.42 55.65 3,486.43 3,417.43 59.89 113.01 5,940,441.177 675,259.183 2.01 39.35 3,600.00 21.18 57.32 3,580.51 3,511.51 78.56 141.26 5,940,460.499 675,286.994 2.82 52.8J 3,700.00 24.08 58.22 3,672.80 3,603.80 99.06 173.82 5,940,481.751 675,319.061 2.92 67.37 3,800.00 26.75 58.75 3,763.12 3,694.12 121.48 210.41 5,940,505.017 675,355.116 2.68 83.10 3,900.00 28.95 59.35 3,651.53 3,782.53 145.50 250.47 5,940,529.956 675,394.611 2.22 99.80 4,000.00 31.65 60.67 3,937.86 3,868.86 170.70 294.18 5,940,556.158 675,437.714 2.78 117.02 4,100.00 34.38 60.85 4,021.71 3,952.71 197.30 341.72 5,940,583.863 675,484.620 2.73 134.97 4,200.00 37.85 61.30 4,102.48 4,033.48 225.80 393.30 5,940,613.547 675,535.525 3.48 154.07 4,300.00 39.52 61.57 4,180.54 4,111.54 255.68 448.20 5,940,644.695 675,589.707 1.68 173.97 4,400.00 42.38 62.53 4,256.06 4,187.06 286.38 506.09 5,940,676.731 675,646.870 2.93 194.15 4,500.00 42.72 63.48 4,329,73 4,260.73 317.08 566.35 5,940,708.813 675,706.391 0.73 213.91 7262017 10.00:10AM Page 4 COMPASS 5000.1 Build 81D %0 'r by BP Final Survey Report BAKER � UGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-32 TVD Project: Prudhoe Bay TVD Reference: KB @ 69.00usft (54: 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB @ 69.00usft (54: 32 8/5/1983 00:00) Well: 14-32 North Reference: True (usft) Wellbore: 14-32A Survey Calculation Method: Minimum Curvature 42.67 Design: 14-32A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EAN Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usR 4,600.00 42.67 63.72 4,403.22 4,334.22 347.23 627.08 5,940;740.365 675,766.408 0.17 233.06 4,700.00 41.62 63.65 4,477.37 4,408.37 376.97 687.23 5,940,771.498 675,825.843 1.05 251.91 4,800.00 41.52 62.80 4,552.18 4,483.18 406.86 746.47 5,940,802.754 675,884.367 0.57 271.06 4,900.00 41.60 63.88 4,627.01 4,558.01 436.63 805.75 5,940,833.887 675,942.941 0.72 290.08 5,000.00 39.67 59.70 4,702.91 4,633.91 467.35 863.13 5,940,865.937 675,999.589 3.34 310.37 5,100.00 37.42 52.85 4,781.15 4,712.15 501.83 914.94 5,940,901.601 676,050.576 4.82 335.32 5,200.00 37.38 50.95 4,860.60 4,791.60 539.30 962.73 5,940,940.172 676,097.481 1.15 363.93 5,300.00 37.43 51.05 4,940.03 4,871.03 577.53 1,009.94 5,940,979.484 676,143.784 0.08 393.38 5,400.00 36.57 52.98 5,019.90 4,950.90 614.57 1,057.36 5,941,017.616 676,190.329 1.45 421.62 5,500.00 36.80 53.20 5,100.09 5,031.09 ...650.45 1,105.13 5,941,054.592 676,237.248 0.26 448.66 5,600.00 37.28 54.22 5,179.91 5,110.91 686.10 1,153.68 5,941,091.357 676,284.957 0.78 475.34 5,700.00 38.12 54.07 5,259.03 5,190.03 721.92 1,203.25 5,941,128.317 676,333.671 0.84 502.01 5,800.00 37.97 54.33 5,337.79 5,268.79 757.97 1,253.23 5,941,165.516 676,382.801 0.22 528.83 5,900.00 37.92 54.62 5,416.65 5,347.65 793.61 1,303.34 5,941,202.310 676,432.063 0.31 555.23 6,000.00 37.45 55.33 5,495.79 5,426.79 828.61 1,353.46 5,941,238.462 676,481.354 0.56 580.99. 6,100.00 37.48 55.92 5,575.16 5,506.16 862.95 1,403.66 5,941,273.960 676,530.743 0.36 606.1t 6,200.00 37.57 55.77 5,654.47 5,585.47 897.15 1,454.07 5,941,309.317 676,580.337 0.13 631.02 6,300.00 37.47 55.95 5,733.78 5,664.78 931.33 1,504.47 5,941,344.657 676,629.934 0.15 655.93 6,400.00 36.88 56.60 5,813.46 5,744.46 964.88 1,554.73 5,941,379.364 676,679.391 0.71 680.24 6,500.00 36.88 56.48 5,893.45 5,824.45 997.97 1,604.80 5,941,413.605 676,728.674 0.07 704.14 6,600.00 37.63 56.75 5,973.04 5,904.04 1,031.28 1,655.34 5,941,448.078 676,778.430 0.77 728.16 6,700.00 38.48 57.00 6,051.79 5,982.79 1,064.96 1,706.97 5,941,482.950 676,829.254 0.86 752.37 6,800.00 40.17 56.25 6,129.14 6,060.14 1,099.83 1,759.88 5,941,519.034 676,881.341 1.76 777.52 6,900.00 42.23 55.92 6,204.38 6,135.38 1,136.58 1,814.54 5,941,557.045 676,935.126 2.07 804.22 7,000.00 43.18 56.43 6,277.86 6,208.86 1,174.33 1,870.88 5,941,596.092 676,990.573 1.01 831.62 7,100.00 43.70 57.03 6,350.47 6,281.47 1,212.05 1,928.37 5,941,635.134 677,047.167 0.66 858.78 7,200.00 44.28 58.07 6,422.42 6,353.42 1,249.31 1,986.98 5,941,673.745 677,104.890 0.93 885.30 72612017 10:00. FOAM Page 5 COMPASS 5000.1 Build 81D �N. bFinal BP Survey Report BA ER FUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-32 Inc Project: Prudhoe Bay TVD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB @ 69.00usft (54: 32 8/5/1983 00:00) Well: 14-32 North Reference: True (usft) Wellborn: 14-32A Survey Calculation Method: Minimum Curvature Design: 14-32A Database: EOM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS ENV Northing Easting DLegV. Sec (usft) (') (°) (usft) (usft) (usft) (usft) (usft) (usft) ('/100usft) (usft) 7,300.00 44.80 58.58 6,493.69 6,424.69 1,286.14 2,046.67 5,941,711.949 677,163.707 0.63 911.20 7,500.00 45.12 59.88 6,635.22 6,566.22 1,358.43 2,168.10 5,941,787.039 677,283.412 0.49 961.3 7,600.00 45.63 60.20 6,705.46 6,636.46 1,393.98 2,229.76 5,941,824.001 677,344.227 0.56 985.60 7,700.00 45.73 60.22 6,775.33 6,706.33 1,429.52 2,291.85 5,941,860.977 677,405.471 0.10 1,009.83 7,800.00 46.48 61.38 6,844.66 6,775.66 1,464.67 2,354.75 5,941,897.577 677,467.537 1.12 1,033.52 7,900.00 47.30 61.47 6,913.00 6,844.00 1,499.59 2,418.87 5,941,933.973 677,530.815 0.82 1,056.78 8,000.00 47.00 61.95 6,981.01 6,912.01 1,534.34 2,483.42 5,941,970.208 677,594.543 0.46 1,079.78 8,100.00 47.13 62.15 7,049.13 6,980.13 1,568.65 2,548.10 5,942,006.013 677,658.397 0.20 1,102.35 8,200.00 46.98 61.92 7,117.26 7,048.26 1,602.98 2,612.75 5,942,041.830 677,722.231 0.23 1,124.92 8,300.00 46.58 62.58 7,185.74 7,116.74 1,636.91 2,677.24 5,942,077.249 677,785.911 0.63 1,147.14 8,400.00 46.62 62.87 7,254.45 7,185.45 1,670.20 2,741.82 5,942,112.034 677,849.695 0.21 1,168.72 8,500.00 45.90 63.00 7,323.59 7,254.59 1,703.08 2,806.15 5,942,146.391 677,913.246 0.73 1,189.92 8,600.00 45.62 63.65 7,393.35 7,324.35 1,735.24 2,870.17 5,942,180.031 677,976.493 0.54 1,210.48 8,700.00 44.70 63.53 7,463,87 7,394.87 1,766.78 2,933.68 5,942,213.034 678,039.246 0.92 1,230.51 8,800.00 43.60 64.30 7,535.62 7,466.62 1,797.41 2,996.23 5,942,245.107 678,101.069 1.22 1,249.81 8,900.00 42.83 64.50 -7,608.49 7,539.49 1,827.00 3,057.98 5,942,276.119 678,162.111 0.78 1,268,23 9,000.00 41.32 64.50 7,682.72 7,613.72 1,855.84 3,118.46 5,942,306.363 678,221.902 1.51 1,286.1: 9,100.00 40.10 66.02 7,758.52 7,689.52 1,883.15 3,177.69 5,942,335.033 678,280.475 1.57 1,302.74 9,200.00 38.60 67.12 7,635.85 7,766.65 1,908.37 3,235.86 5,942,361.595 678,338,039 1.65 1,317.47 9,300.00 36.78 68.08 7,914.98 7,845.98 1,931.67 3,292.38 5,942,386.207 678,393.997 1.91 1,330.61 9,400.00 35.00 69.08 7,995.99 7,926.99 1,953.09 3,346.95 5,942,408.886 678,448.047 1.87 1,342.23 9,500.00 33.45 70.43 8,078.67 8,009.67 1,972.56 3,399.71 5,942,429.578 678,500.337 1.73 1,352.24 9,600.00 32.08 70.63 8,162.76 8,093.76 1,990.60 3,450.73 5,942,448.798 678,550.924 1.37 1,361.15 9,700.00 30.62 70.77 8,248.16 8,179.16 2,007.80 3,499.83 5,942,467.129 678,599.609 1.46 1,369.56 9,800.00 28.78 72.55 8,335.02 8,266.02 2,023.41 3,546.85 5,942,483.824 678,646.246 2.04 1,376.77 9,900.00 27.03 73.80 8,423.39 8,354.39 2,036.97 3,591.63 5,942,498.420 678,690.705 1.85 1,382.34 10,000.00 25.73 74.33 8,512.98 8,443.98 2,049.17 3,634.36 5,942,511.611 678,733.130 1.32 1,386.94 726/2017 10:00:10AM Page 6 COMPASS 5000.1 Build BID z;N by Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Design: 14-32A BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BA UGHES GE.m,a , Well 14-32 KB @ 69.00usft (54 : 32 8/5/1983 00:00) KB @ 69.00usft (54 : 32 8/5/1983 00:00) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Sumoy MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 10,088.00 24.89 74.54 8,592.53 8,523.53 2,059.27 3,670.60 5,942,522.547 678,769.126 0.96 1,390.59 95/8'. 10,100.00 24.78 74.57 8,603.42 8,534.42 2,060.61 3,675.46 5,942,524.001 678,773.952 0.96 1,391.07 10,200.00 24.68 72.45 8,694.25 8,625.25 207248 3,715.57 5,942,536.801 678,813.771 0.89 1,395.79 TIP 10,225.00 24.60 72.69 8,716.97 8,647.97 2,075.60 3,725.51 5,942,540.153 678,823.640 0.51 1,397.14 KOP-WS 10,258.14 28.45 72.50 8,746.62 8,677.62 2,080.03 3,739.63 5,942,544.907 678,837.653 11.61 1,399.05 Interpolated Azimuth 10,290.04 38.75 71.00 8,773.15 8,704.15 2,085.58 3,756.36 5,942,550.844 678,854.250 32.39 1,401.61 Interpolated Azimuth 10,320.32 48.01 66.00 8,795.14 ..8,726.14 2,093.26 3,775.65 5,942,558.971 678,873.353 32.60 1,405.83 Interpolated Azimuth 10,353.05 57.54 60.68 8,814.93 8,745.93 2,105.00 3,798.87 5,942,571.248 678,896.288 31.85 1,413.36 10,380.44 66.29 60.04 8,827.81 8,75881 2,116.95 3,819.85 5,942,583.675 678,916.983 32.01 1,421.48 10,413.30 77.34 60.16 8,838.05 8,769.05 2,132.48 3,846.87 5,942,599.835 678,943.635 33.631432.09 10,440.48 10,440.48 87.82 59.12 8,841.55 8,772.55 2,146.09 3,870.09 5,942,613.976 678,966.533 38.74 1,441.4: 10,470.02 91.93 51.72 8,841.62 8,772.62 2,162.84 3,894.39 5,942,631.285 678,990.435 28.65 1,453.73 10,500.98 91.04 40.14 8,840.81 8,771.81 2,184.33 3,916.59 5,942,653.284 679,012.126 37.50 1,471.04 10,529.92 91.20 29.56 8,840.25 8,771.25 2,208.04 3,933.10 5,942,677.371 679,028.080 36.56 1,491.52 10,561,91 90.12 16.89 8,839.88 8,770.88 2,237.38 3,945.69 5,942,706.989 679,039.983 39.75 1,518.23 10,591.08 90.95 7.06 8,839.60 8,770.60 2,265.88 3,951.73 5,942,735.619 679,045.363 33.82 1,545.24 10,620.61 92.12 358.07 8,838.81 8,769.81 2,295.34 3,953.05 5,942,765.098 679,045.999 30.69 1,574.02 10,650.51 92.30 34771 8,837.65 8,768.65 2,324.94 3,949.36 5,942,794.610 679,041.619 34.63 1,603.82 10,679.87 91.04 339.09 8,836.80 8,767.80 2,353.04 3,940.98 5,942,822.503 679,032.592 29.66 1,632.95 10,710.06 90.40 330.53 8,836.42 8,767.42 2,380.33 3,928.15 5,942,649.487 679,019.126 28.43 1,662.05 10,739.95 92.58 327.96 8,835.64 8,766.64 2,406.01 3,912.87 5,942,874.798 679,003.257 11.27 1,689.99 10,774.16 93.07 322.98 8,833.95 8,764.95 2,434.15 3,893.51 5,942,902.479 678,983.248 14.61 1,721.07 726/2017 10:00,10AM Page 7 COMPASS 5000.1 Build 81O •Nti BP BA ER S b Final Survey Report F�UGHES MD Inc Company: North America- ALASKA - BP Local Coordinate Reference: Well 14-32 PJW Project: Prudhoe Bay TVD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) Site: PB DS 14 MD Reference: KB @ 69.00usft (54 : 32 8/5/1983 00:00) Well: 14-32 North Reference: True (°1100usft) Wallbore: 14-32A Survey Calculation Method: Minimum Curvature 325.26 Design: 14-32A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azl (azimuth) TVD TVDSS NIS PJW Northing Eas0ng DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 10,802.95 92.30 325.26 8,832.60 8,763.60 2,457.45 3,876.65 5,942,925.379 676,965.859 8.35 1,746.94 10,632.68 88.99 322.05 8,632.27 8,763.27 2,481.38 3,859.04 5,942,948.900 678,947.695 15.51 1,773.5- 10,861.70 87.85 326.00 8,833.07 8,764.07 2,504.85 3,842.00 5,942,971.967 678,930.118 14.16 1,799.64 10,890.60 88.19 330.23 8,834.07 8,765.07 2,529.37 3,626.75 5,942,996.124 678,914.301 14.68 1,826.44 10,929.32 90.12 338.64 8.834.64 8,765.64 2,564.27 3,810.06 5,943,030.617 678,896.805 22.28 1,863.70 10,949.98 90.18 339.14 8,834.59 8,765.59 2,583.54 3,802.62 5,943,049.711 678,888.919 2.44 1,863.97 10,976.02 90.28 343.56 8,834.48 8,765.48 2,608.21 3,794.29 5,943,074.175 678,880.023 16.98 1,909.71 11,000.44 90.61 344.94 8,834.29 8,765.29 2,631.71 3,787.66 5,943,097.515 678,872.851 5.81 1,934.01 11,030.22 85.45 342.84 8,835.32 8,766.32 2,660.29 3,779.41 5,943,125.897 678,663.935 18.70 1,963.59 11,060.16 83.82 340.49 8,838.12 8769,12 2,688.58 3,770.04 5,943,153.962 678,853.906 9.52 1,993.08 11,092.14 80.25 339.62 8,842.55 8,773.55 2,718.35 3,759.23 5,943,183.468 678,842.417 11.48 2,024.27 11,120.19 77.66 339.40 8,847.87 8,778.87 2,744.15 3,749.60 5,943,209.031 678,832.162 8.56 2,051.35 11,149.92 74.18 337.76 8,855.05 8,786.05 2,771.00 3,739.06 5,943,235.630 678,821.031 13.49 2,079.62 11,180.08 71.21 336.41 8,864:02 8,795.02 2,797.52 3,727.86 5,943,261.880 678,809.211 10.73 2,107.68 11,217.25 73.03 331.87 8,875.44 8,606.44 2,829.34 3,712.43 5,943,293.329 678,793.046 12.61 2,141.70 11,247.22 72.53 327.51 8,684.32 8,815.32 2,854.04 3,697.98 5,943,317.693 678,778.035 14.00 2,168.54 11,271.63 73.44 325.37 8,891.46 8,822.46 2,873.49 3,685.08 5,943,336.835 678,764.684 9.17 2,189.9? 11,300.35 73.85 321.12 8,899.55 8,830.55 2,895.56 3,668.59 5,943,358.517 678,747.690 14.27 2,214.53 11,330.49 73.34 320.01 8,908.06 8,839.06 2,917.90 3,650.23 5,943,380.414 678,728.812 3.92 2,239.71 11,361.25 72.53 315.88 8,917.09 8,848.09 2,939.73 3,630.54 5,943,401.779 678,708.621 13.10 2,264.63 11,391.02 72.29 314.45 8,926.09 8,857.09 2,959.85 3,610.53 5,943,421.430 678,688.153 4.65 2,287.92 11,425.54 71.24 318.86 8,936.90 8,867.90 2,983.68 3,588.03 5,943,444.733 678,665.107 12.51 2,315.30 11,450.74 71.71 323.26 8,944.91 8,875.91 3,002.26 3,573.02 5,943,462.958 678,649.668 16.66 2,336.20 11,480.90 71.77 327.00 8,954.36 8,885.36 3,025.76 3,556.65 5,943,486.064 678,632.756 11.78 2,362.18 11,510.87 73.90 330.20 8,963.21 8,894.21 3,050.20 3,541.74 5,943,510.148 678,617.281 12.43 2,388.84 11,541.97 77.88 332.68 8,970.79 8,901.79 3,076.68 3,527.33 5,943,536.291 678,602.260 14.95 2,417.43 11,571.30 80.48 335.04 8,976.29 8,907.29 3,102.54 3,514.64 5,943,561.847 678,586.976 11.88 2,445.10 71262017 10:OO10AM Page 8 COMPASS 5000.1 Build 81D BP Z. _= by Final Survey Report BAIUGHES �N` c[,omeam Company: Project: Site: Well: Wellbore: Design: North America - ALASKA - BP Prudhoe Bay PB DS 14 14-32 14-32A 14-32A Local Co-ordinate Reference. TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 14-32 KB @ 69.00usft (54 : 32 8/5/1983 00:00) KB @ 69.00usft (54: 32 8/5/1983 00:00) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EMI Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) r"- 11,600.82 81.48 338.16 8,980.92 8,911.92 3,129.29 3,503.06 5,943,588.322 678,576.782 10.97 2,473.45 11,630.75 82.51 342.47 8,985.09 8,916.09 3,157.19 3,493.08 5,943,615.981 678,566.157 14.67 2,502.66 11,665.88 82.04 346.84 8,989.82 8,920.82 3,190.76 3,483.87 5,943,649.317 678,556.170 12.40 2,537.31 11,692.81 85.11 346.47 8,992.83 8,923.83 3,216.79 3,477.69 5,943,675.200 678,549.391 11.48 2,564.02 11,720.88 88.52 347.87 8,994.39 8,925.39 3,244.11 3,471.47 5,943,702.368 678,542.536 13.13 2,592.01 11,750.87 92.03 347.01 8,994.25 8,925.25 3,273.38 3,464.95 5,943,731.474 678,535.338 12.05 2,621.97 11,780.78 96.64 349.60 8,991.99 8,922.99 3,302.57 3,458.91 5,943,760.518 678,528.616 17.67 2,651.77 11,810.56 99.50 345.31 8,987.80 8,918.80 3,331.35 3,452.51 5,943,789.132 678,521.552 17.19 2,681.21 11,843.16 100.56 342.64 8,982.13 8,913.13 3,362.20 3,443.65 5,943,819.767 678,511.978 8.70 2,713.13 11,874.62 100.31 339.14 8,976.43 8,907.43 3,391.43 3,433.52 5,943,848.752 678,501.175 10.97 2,743.68 11,906.66 100.65 334.43 8,970.59 8,901.59 3,420.37 3,421.11 5,943,877.400 676,488.092 14.49 2,774.34 11,930.64 101.04 332.38 8,966.08 8,897.08 3,441.43 3,410.56 5,943,898.206 678,477.063 8.55 2,796.91 11,960.73 100.53 329.88 8,960.45 8,891.45 3,467.31 3,396.29 5,943,923.748 678,462.196 8.34 2,824.88 11,990.66 99.10 327.35 8,955.35 8,886.35 3,492.49 3,380.93 5,943,948.556 678,446.258 9.60 2,852.34 12,024.26 97.39 332.69 8,950.53 8,881.53 3,521.28 3,364.33 5,943,976.954 678,428.988 16.53 2,883.58 12,051.56 99.29 336.12 8,946.57 8,877.57 3,545.64 3,352.66 5,944,001.030 678,416.757 14.25 2,909.5. 12,080.93 100.13 342.83 8,941.61 8,872.61 3,572.73 3,342.51 5,944,027.879 678,405.985 22.70 2,938.03 12,114.26 99.84 345.24 8,935.83 8,866.63 3,604.29 3,333.49 5,944,059.216 678,396.228 7.17 2,970.68 12,140.60 100.17 349.62 8,931.25 8,862.25 3,629.60 3,327.84 5,944,084.387 678,389.997 16.42 2,996.58 12,170.66 100.07 345.80 8,925.96 8,856.96 3,658.51 3,321.54 5,944,113.139 678,383.030 12.51 3,026.15 12,201.58 100.89 342.69 8,920.34 8,851.34 3,687.76 3,313.29 5,944,142.196 678,374.099 10.24 3,056.39 12,234.23 101.24 340.52 8,914.07 8,845.07 3,718.17 3,303.18 5,944,172.355 678,363.286 6.61 3,088.09 12,266.46 101.14 336.48 8,907.82 8,838.62 3,747.58 3,291.60 5,944,201.487 676,351.023 12.27 3,119.07 12,290.11 101.89 334.20 8,903.09 8,834.09 3,768.64 3,281.93 5,944,222.316 678,340.871 10.00 3,141.48 12,321.10 99.98 331.56 8,897.21 8,828.21 3,795.72 3,268.06 5,944,249.062 678,326.376 10.39 3,170.56 12,351.41 99.02 328.35 8,892.21 8,823.21 3,821.59 3,253.09 5,944,274.578 678,310.814 10.91 3,198.64 726/201710'00: 10AM Page 9 COMPASS 5000.1 Build BID 04,40 BP Zp Final Survey Report Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Design: 14-32A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BAER ES GE�ompanv Well 14-32 KB @ 69.00usft (54 : 32 8/5/1983 00:00) KB @ 69.00usft (54 : 32 8/5/1983 00:00) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (uaft) (usft) (usft) (°1100usft) (usft) 12,393.00 99.02 328.35 8,885.69 8,816.69 3,856.56 3,231.54 5,944,309.032 678,288.455 0.00 3,236.82 Projection to TD .2-718" 12,393.00 8,885.69 2-7/8" 2.875 4.250 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 10,200.00 8,694.25 2,072.48 3,715.57 TIP. 10,225.00 8,716.97 2,075.60 3,725.51 KOP-WS 10,258.14 8,746.62 2,080.03 3,739.63 Interpolated Azimuth 10,290.04 8,773.15 2,085.58 3,756.36 Interpolated Azimuth 10,320.32 8,795.14 2,093.26 3.77565 Interpolated Azimuth 12,393.00 8,885.69 3,856.56 3,231.54 Projection to TD Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes a GE Company 71262017 10.00: 10AM Page 10 COMPASS 5000.1 Build 81D THE STATE °fALASKA GOVERNOR BILL WALKER Sean McLaughlin CTD & RWO SDE BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-32A BP Exploration (Alaska), Inc. Permit to Drill Number: 217-082 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Surface Location: 40' FSL, 1292' FEL, SEC. 4, TION, R14E, UM Bottomhole Location: 3887' FSL, 1963' FWL, SEC. 3, TION, R14E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner s DATED this Lday of June, 2017. nCLOCIVCU STATE OF ALASKA .ASKA OIL AND GAS CONSERVATION COMMISS MAY 2 5 2017 PERMIT TO DRILL 20 AAC 25.005 la. Type of Work: 1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify if well is proposed for: Drill ❑ Lateral ❑ Slretigraphic Test ❑ Development -Oil 0• Service-Winj ❑ Single Zone 0. Coalbed Gas ❑ Gas Hydrates❑ Redrill 0• Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 -Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380- PBU 14.32A ' 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 12366' - ND: 8825'ss + PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): AOL 028312 - Surface: 40' FSL, 1297 FEL, Sec.04, T10N, R14E, UM 8. DNR Approval Number: 13. Approximate spud date: Top of Productive Horizon: 2114 FSL, 2436' FWL, Sec. 03, TION, R14E, UM 77-043 July 15, 2017 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 388T[ FSL, 1963' FWL, Sec. 03, T10N, R14E, UM 19600 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 69 'feet 15. Distance to Nearest Well Open Surface: x- 675148 y- 5940379 Zone - ASP 4 GL Elevation above MSL: 38.93 •tee[ t1 Same Pool: 16. Deviated wells: Kickoff Depth: 10230 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 100 degrees Downhole: 3347 • Surface: 2453 • 18. Casing Program: S ecNcations Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casino Weiohl I Grade COUDlino Len th MD ND MD ND (includina stage data 4-1/2" 3-112'x3-1/4" 9.3#/6.6# 13Cr85/L-80 STL?CII 2889' 9477' 7991'ss 12366' 8825'ss 145 sx Class'G' x2-7/8" /6.5# 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth ND (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth ND (it): Junk (measured): 10900 9326 None 10510 8975 None Casing Length Size Cement Volume MD ND Conductor/Structural 80 20' 1800# Poleset 30-110 30-110 Surface 2463 13-3/8' 2350 sx Fondu, 400 sx PF'C' 30-2493 30-2493 Intermediate 10061 98/8" 500 sx Class'G', 300 sx PF'C' 27-10088 27-8593 Liner 1044 7' 360 sx Class'G' 9758-10802 8298-9238 Liner 1023 4-1/T 184 sx Class'G' 9477-10500 8060-8966 Perforation Depth MD (ft): 10364 -10395 Perforation Depth ND (ft): 8843-8871 Hydraulic Fracture planned? Yes ❑ No 0 ' 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Tempel. Joshua from without prior written approval. Authorized Name Mcla_ughim, Sean M Contact Email Joshua.Tempel(albp.com Authorized Title CTD & RWO SDE Contact Phone c j Authorized Signature `� Date J X45 I Commission Use Only Permit to Drill ��� API Number: 50- 029-20999- - Permit Approval See cover letter for other Number. z 1-7— Date: requirements: Conditions of approval : if box is checked, well may not be used to exploreeldsi, or produce coalbed gas hydrates, or gas contained in shales: methane, — Other. ;11> SU 3 O P dt��1 Samples req'd: Yes ❑ / No ED/ / Mud log mq'd: Yes ❑ No 2 ff5 eo ✓ / 4/ �1 yr r�-Gt r �7"✓,/ H2S measures Yes fiY No ❑ Directional svy req'd: Yes U" No ❑ /j- L y 0012�� Spacing exception mq'd: Yes ❑ No M/ Inclination -only svy mq'd: Yes ❑ No 7 Post initial injection MIT mq'd: Yes ❑ No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: V-rL 6<i61 -- Form 16401 Revised 5/2017 This permit Is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and Attachments in Duplicate ORIGINAL �0%s-�� To: Alaska Oil & Gas Conservation Commission From: Josh Tempel CTD Engineer Date: May 25, 2017 Re: 14-32A Permit Approval RECEIVES`' MAY 2 5 2017 A0GGC Permit approval is requested drill an Ivishak sidetrack from the 14-32 wellbore. r0+tiZ bp 1� Well was initially drilled and completed in 1983 and worked over in 2015. The parent bore is currently producing at the facility marginal GOR and there are no remaining wellwork opportunities. Proposed plan: Drill a through tubing sidetrack with the CDR 2 Coiled Tubing Drilling rig on or around July 15th, 2017. E -line unit will set a CTD whipstock. CDR 2 will mill a 3.80" window in the production liner and drill a well in the Ivishak. The lateral will be completed with a 3-1/2" x 3-1/4" x 2-7/8" 13Cr85 liner which will be cemented and perforated. CTD Drill and Complete 14-32A program: Rig Start Date: July 15th, 2017 Pro-RigWork scheduled to begin June 5th, 2017 S 1 Drift. GLV work. F 2 A/SL: Load IA and TBG E 3 Set Packer Whipstock V 41 Set TWC Rig Work: 1. MIRU and test BOPE. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,453 psi. 2. Mill 3.80" window plus 10' of rathole. Swap the well to 8.5-9.5 ppg drilling fluid. 3. PU drilling BHA and drill 4.25" hole to TD. - 4. Run open hole logs. 5. Run 3-1/2" x 3-1/4" x 2-7/8" 13Cr85 liner. 6. Pump primary cement bringing TOC to TOL. 7. Test liner lap to 2,400 psi. 8. Perforate liner per asset instructions 9. Freeze protect well, RDMO Post Rig: 1. Drift. Run RPM log. 2. Perforate 3. Contingency: Set liner top packer Approved alternate plug placement per 20 AAC 25.112(i) Mud Program: • Well kill: 8.4-8.6 ppg brine. • Milling/drilling: 8.4-9.5 ppg mud Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4.25" Liner Program: • 3-1/2", 9.3# 13Cr85 STL Liner 9,477' MD - 10,180' MD • 3-1/4", 6.5# L-80, TCII Liner 10,180 MD — 12,366' MD • Contingency 2-7/8" 6.4# 13CR85 Liner • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A cross over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. • Magnetic and inclination surveys will be taken every 30 ft. • Distance to nearest property —19,600' • Distance to nearest well within pool — 15' - Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. . Perforating: • 2" guns, 6 spf, pert guns • The primary barrier for this operation: a minimum EMW of 8.4 ppg • A cross over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision • All wells pass BP anti -collision criteria. Hazards • DS 14 is an H2S pad • High risk of lost circulation • One anticipated fault crossing Reservoir Pressure • The reservoir pressure on 14-32A is expected to be 3347 psi at 8940' TVDss. (7.2 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,453 psi. Managed Pressure Drilling • MPD techniques may be used to improve hole stability. • An automatic choke will maintain a target ECD at the window for the duration of drilling to improve hole stability. • A pressure schedule will be used for tripping In/Out of the hole. The purpose of the pressure schedule for tripping is to maintain the same bottom hole pressure at the window by applying surface pressure via the choke. • At all times, drilling fluid weight will be greater than equivalent pore pressure. MPD is only being used for hole stability. Josh Tempel CC: Well File CTD Engineer Joseph Lastufka Loepp, Victoria T (DOA) From: Tempel, Joshua <Joshua.Tempel@bp.com> Sent: Wednesday, May 31, 2017 3:21 PM To: Loepp, Victoria T (DOA) Subject: RE: PBU 14-32A(PTD 217-082) Anti -collision Hi Victoria, 14-03A currently has a deep set plug installed, the plug will remain in place while 14-32A is drilled. Regards, Josh From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov] Sent: Wednesday, May 31, 2017 3:00 PM To: Tempel, Joshua Subject: PBU 14-32A(PTD 217-082) Anti -collision Joshua, Drilling PBU 14-32A fails major risk with PBU 14-03 and PBU 14-03A. What mitigation measures will be in place. Will PBU 14-03A be shut in while drilling or a deep plug set? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loeopra77alaska.goy CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal low. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loeoo@olaska.aov 5,*4. bp, North America - ALASKA - BP Prudhoe Bay PB DS 14 14-32 14-32A Plan: 14-32A WP03 BP Coil Tubing Report 24 May, 2017 FU - 'A BAKER HUGHES BP 14-32, 14-32 MAP FA9 by From: Map BAKER Company: North America-ALASKA -BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Design: 14-32A WP03 BP 14-32, 14-32 MAP FA9 BP Coil Tubing Report From: Map BAKER Position Uncertainty: _ 0.00 usft Slot Radius: HUMES Local Co-ordinate Reference: Well 14-32 14-32A TVD Reference: Mean San Level MD Reference: 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling ng) North Reference: True , Survey Calculation Method: Minimum Curvature ' Vertical Section: Database: EDM R5K - Alaska PROD - ANCP1 (usft) eject Prudhoe Bay, GPB, PRUDHOE BAY tp System: Alaska NAD27 State Plane Zones - System Datum: Mean Sea Level no Datum: NAD27 ° OGP-Usa AK [4267'15884] Using Well Reference Point rp Zone: NAD27' OGP-Usa AK /Alaska zone 4126734.1586° Using geodetic scale factor She PB DS 14, TR -10-14 14-32, 14-32 Site Position: Northing: From: Map Easting: Position Uncertainty: _ 0.00 usft Slot Radius: _ Well 14-32, 14-32 Well Position +N/ -S 0.00 usft +EI -W 0.00 usft Position Uncertainty 0.00 usft WNlbors 14-32A Magnetics Model Name Sample Date BGGM2016 _ 8/1/2017 Design 14-32A WP03 Audit Notes: Version: Phase: Vertical Section: Depth From (MDI (usft) -41.49 Northing: Basting: Wellhead Elevation: Declination 1777 PLAN +N/ -S (usft) Goo 5,939,577.430 usft 674,150.480 usft 0.000 in 5,940,378.685 usft 675,147.602 usft - 41.49 usft Latitude: Longitude: Grid Convergence: Dlp Angle Field Strength 1°I (nT) 80.97 _ 57,543 Tie On Depth: 10,100.00 +E/ -W Direction (usft) ("I 0.00 350.00 Latitude: Longitude: Ground Level: 70° 14'26.346 N 148' 35'36+726 W 1.32 70° 14'33.997 N 148° 35'7,205 W 38.93 usft 524/2017 4:21: 16PM Page 2 COMPASS 50001 Build 61B 524/2017 4: 21: 16PM Tool Name SRG MWD BP I/.iis BP Coil Tubing Report BAKER HUGHES Local Co-ordinate Reference: Well 14-32 TVD Reference: by MD Reference: 54: 32 8/5/1983 00:00 @ 69.00us8 (generic drilling rig) North Reference: True Survey Calculation Method: Company: North America - ALASKA - BP EDM R5K-Alaska PROD -ANCP1 Project- Prudhoe Bay (°1100usfj (usft) Site: PB DS 14 8,534.42 2,060.61 Well: 14-32 5,942,524.004 678,773.946 Wellbore: 14-32A 1,391.07 0.00 Design: 14-32A WP03 2,072.48 3,715.56 Survey Tool Program Data 5/24/2017 678,813.765 From To 1,395.80 -97.40 (usft) (usft) Survey (Wellbore) 100.00 10,100.00 SIGMA-Gyro(14-32) 5,942,540.820 10,100.00 12,366.00 14-32A WP03 (14-32A) Planned Survey 1,397.41 126.80 MD Inc Azl 3,735.71 (usft) (°I (°I 9.00 10,100.00 24.78 74.57 14-32A Actual Survey 3,756.68 5,942,550.564 10,200.00 24.68 72.45 14-32A Actual Survey TIP 8,711.31 2,087.38 10,230.00 - 24.59 72.74 KOP 1,402.22 -20.00 10,250.00 26.39 72.74 End 9deg/100ft 678,937.419 35.00 10,290.00 40.39 72.74 5 3,871.59 5,942,610.935 10,300.00 43.69 71.01 10,400.00 77.47 60.14 10,436.74 90.00 57.25 6 1,473.16 -90.00 10,500.00 90.00 35.10 10,600.00 90.00 0.10 10,700.00 90.00 325.10 10,714.59 90.00 320.00 End 36dsW100ft 35.00 1,658.04 10,800.00 90.00 330.25 I 10,894.59 90.00 341.60 8 1,670.97 -90.00 10,900.00 90.00 340.95 524/2017 4: 21: 16PM Tool Name SRG MWD BP I/.iis BP Coil Tubing Report BAKER HUGHES Local Co-ordinate Reference: Well 14-32 TVD Reference: Mean Sea Level MD Reference: 54: 32 8/5/1983 00:00 @ 69.00us8 (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 (usft) Description Conventional SRG single shots MWD - Standard TVDSS NIS ENV Northing Emitting 131-e9 V. Sec TFace (usft) (usft) (usft) (usft) (usft) (°1100usfj (usft) (°) 8,534.42 2,060.61 3,675.45 5,942,524.004 678,773.946 0.00 1,391.07 0.00 8,625.25 2,072.48 3,715.56 5,942,536.803 678,813.765 0.89 1,395.80 -97.40 8,652.52 2,076.22 3,727.49 5,942,540.820 678,825.606 0.50 1,397.41 126.80 8,670.57 2,078.78 3,735.71 5,942,543.564 678,833.763 9.00 1,398.50 0.00 8,703.88 2,085.29 3,756.68 5,942,550.564 678,854.575 35.00 1,401.27 0.00 8,711.31 2,087.38 3,763.04 5,942,552.797 678,860.886 35.00 1,402.22 -20.00 8,759.83 2,124.07 3,840.46 5,942,591.271 678,937.419 35.00 1,424.91 -18.71 8,763.84 2,143.01 3,871.59 5,942,610.935 678,968.100 35.00 1,438.16 -13.12 8,763.84 2,186.55 3,916.94 5,942,655.506 679,012.429 35.00 1,473.16 -90.00 8,763.84 2,280.39 3,946.72 5,942,750.008 679,040.016 35.00 1,560.40 -90.00 8,763.84 2,374.34 3,917.29 5,942,843.242 679,008.410 35.00 1,658.04 -90.00 8,763.84 2,385.91 3,908.42 5,942,854.608 678,999.278 35.00 1,670.97 -90.00 8,763.84 2,455.89 3,859.65 5,942,923.432 678,948.894 12.00 1,748.36 90.00 8,763.84 2,542.11 3,821.13 5,943,008.725 678,908.383 12.00 1,839.96 90.00 8,763.84 2,547.24 3,819.39 5,943,013.811 678,906.526 12.00 1,845.31 -90.00 Page 3 COMPASS 5000.1 Build BIB ,a00 BP FUN T p BP Coil Tubing Report BAKER HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Design: 14-32A WP03 Planned Survey MD (usft) 11,000.00 11,000.09 9 11,100.00 1,151.15 � 10 11,200.00 11,271.15 11 11,300.00 11,400.00 11,451.15 12 11,500.00 11,568.15 13 11,600.00 11,700.00 11,718.34 14 11,800.00 11,807.08 15 11,900.00 11,947.08 18 12,000.00 12,100.00 Local Co-ordinate Reference: Well 14-32 ND Reference: Mean Sea Level MD Reference: 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling ng) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K- Alaska PROD - ANCPi Inc Azi TVDSS NIS EIW Northing Basting DLeg V. Sec (usft) (uslt) (usft) (usft) Nail) (°1100usft) (usft) 90.00 328.95 8,763.84 2,637.67 3,777.12 5,943,103.227 678,862.176 12.00 1,941.70 90.00 328.94 8,763.84 2,637.74 3,777.08 5,943,103.299 678,862.130 12.00 1,941.78 78.74 333.09 8,773.62 2,724.54 3,728.96 5,943,188.956 678,812.007 12.00 2,035.63 73.00 335.33 8,786.10 2,769.18 3,707.38 5,943,233.075 678,789.397 12.00 2,083.33 73.00 329.20 8,800.39 2,810.51 3,685.65 5,943,273.864 678,766.713 12.00 2,127.80 73.00 320.27 8,821.19 2,866.00 3,64840 5,943,328.451 678,726.191 12.00 2,189.27 73.00 323.89 8,829.63 2,887.77 3,629.45 5,943,349.811 678,708.738 12.00 2,213.65 73.00 336.44 8,858.86 2,970.56 3,581.97 5,943,431470 678,659.349 12.00 2,303.42 73.00 342.86 8,873.82 3,016.39 3,564.96 5,943,478.898 678,641.288 12.00 2,351.52 73.00 336.73 8,888.10 3,060.21 3,548.84 5,943,520.327 678,624.146 12.00 2,397.47 73.00 328.18 8,908.02 3,117.94 3,518.72 5,943,577.337 678,592.702 12.00 2,459.55 76.60 329.52 8,916.38 3,144.24 3,502.83 5,943,603.259 678,576.201 12.00 2,488.21 87.92 333.53 8,929.83 3,231.20 3,455.71 5,943,689.098 678,527.080 12.00 2,582.04 90.00 334.25 8,930.16 3,247.67 3,447.64 5,943,705.366 678,518.632 12.00 2,599.65 99.20 337.63 8,923.62 3,321.90 3,414.48 5,943,778.803 678,483.758 12.00 2,678.51 10000 337.93 8,922.43 3,328.36 3,411.84 5,943,785.199 678,480.970 12.00 2,685.33 100.00 349.26 8,906.30 3,416.00 3,386.04 5,943,872.212 678,453.136 12.00 2,776.12 100.00 355.00 8,898.12 3,461.90 3,379.69 5,943,917.955 678,445.723 12.00 2,822.43 100.00 348.54 8,888.93 3,513.46 3,372.23 5,943,969.319 678,437.071 12.00 2,874.50 100.00 336.35 8,871.57 3,607.18 3,342.59 5,944,062.318 678,405.262 12.00 2,971.94 TFace -90.00 -90.00 160.00 159.59 -90.90 -91.31 90.53 91.84 90.94 -90.90 -91.25 20.00 1965. 19.10 20.00 20.27 89.01 89.50 -8944 -88.94 524/2017 4:21: 16PM Page 4 COMPASS 5000.1 Build BIB 1.4r,L BP h�2 p BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Local Coorcinate Reference: Well 14-32 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 14 MD Reference: 54 : 32 8/5/1983 00:00 $ 69.00usft (generic drilling dg) Well: 14-32 North Reference: True Wellbore: 14-32A Survey Calculation Method: Minimum Curvature Design: 14-32A WP03 Database: EDM R5K-Alaska PROD -ANCP1 Planned Survey MD Inc Azi TVDSS NIS EIW Nothing Easting DLeg V. Sec TFace (usft) (•) (•) (usft) (waft) (usft) (usft) (usft) (°I100usft) (usft) 1°1 12,166.62 100.00 328.23 8,860.00 3,665.22 3,312.11 5,944,119.631 678,373.443 12.00 3,034.39 -89.29 17 12,200.00 100.00 332.30 8,854.20 3,693.75 3,295.81 5,944,147.778 678,356.488 12.00 3,065.33 89.65 12,300.00 100.00 344.49 8,836.84 3,785.14 3,259.62 5,944,238.296 678,318.185 12.00 3,161.61 88.94 12,366.00 • 100.00 352.54 8,825.38 3,848.79 3,246.69 5,944,301.623. 678,303.777. 12.00 3,226.54 89.30 TD M 12366.00 W412017 4:21:16PM Page 5 COMPASS 5000.1 Build 81B Targets BID P ���� pBP Coil Tubing Report Target Name BAKER MOVES Company: North America -ALASKA - BP Local Coordinate Reference: Well 14-32 Earting Project: Prudhoe Bay TVD Reference: Mean Sea Level (-ft) Site: PB DS 14 MD Reference: 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling ng) Well: 14-32 North Reference: True Wellbore: 14-32A Survey Calculation Method: Minimum Curvature 2,506.94 Design: 14-32A WP03 Database: EDM RSK-Alaska PROD -ANCP1 148° 33' 54.295 W Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +NI -S +PJ -W Northing Earting -Shape (°) (°) (weft) (usft) (-ft) (usft) (usft) Latitude Longitude 14-32A Fault 1 0.00 0.00 0.00 3,000.07 2,506.94 5,943,436.000 877,584.000 70° 15'3,499 N 148° 33' 54.295 W - plan misses target center by 8665.12usft at 10100.00usft MD (8534.42 TVD, 2060.61 N, 3675.45 E) - Polygon Point 1 0.00 0.00 0.00 5,943,436.00 677,584.00 i Point 0.00 -599.30 1,381.54 5,942,869.00 678,979.00 Point 0.00 -899.17 2,749.03 5,942,601.00 680,353.00 Point 0.00 -599.30 1,381.54 5,942,869.00 678,979.00 14-32A Fault 2 0.00 0.00 0.00 4,192.06 3,902.11 5,944,060.000 678,951.000 70° 15'15.216 N 148° 33'13,700 W - plan misses target center by 6799.47usft at 10100,00usft MD (8534.42 TVD, 2060.61 N, 3675.45 E) - Polygon Point 1 0.00 0.00 0.00 5,944,660.00 678,951.00 Point 0.00 -707.60 15.58 5,943,953.00 678,983.00 Point 0.00 -1,322.29 122.32 5,943,341.00 679,104.00 Point 0.00 -707.60 15.56 5,943,953.00 678,983.00 14-32A Fault 3 0.00 0.00 0.00 4,133.89 3,004.45 5,944,581.000 678,055.000 70° 15' 14.648 N 148' 33' 39.812 W - plan misses target center by 8808.23usft at 10100.00usft MD (8534.42 TVD, 2060.61 N, 3675.45 E) - Polygon Point 1 0.00 0.00 0.00 5,944,581.00 678,055.00 Point 2 0.00 -293.70 714.42 5,944,304.00 678,776.00 14-32A T2 0.00 0.00 8,763.00 2,779.20 3,660.20 5,943,242.000 678,742.000 70° 15' 1.322 N 148° 33'20,757 W - plan misses target center by 48.90usft at 11173.88usft MD (8792.76 TVD, 2788.70 N, 3697.82 E) - Point 14-32A T3 0.00 0.00 8,825.00 3,809.45 3,233.99 5,944,262.000 678,292.000 70° 15'11.456 N 148° 33'33.139 W - plan misses target center by 37.25usft at 12300.00usft MD (8836.84 TVD, 3785.14 N, 3259.62 E) - Point 14-32A T1 Invert 0.00 0.00 8,930.00 3,231.67 3,342.24 5,943,686.930 678,413.640 70° 15'5.774 N 148° 33' 29.998 W - pian misses target center by 102.22usft at 11746.68usft MD (8929.37 TVD, 3273.30 N, 3435.60 E) - Point 14-32A T1 0.00 0.00 8,763.00 2,142.08 3,871.47 5,942,610.000 678,968.000 70° 14'55.055 N 148' 33'14.622 W - plan misses target center by 1.10usft at 10436.OBusft MD (8763.83 TVD, 2142.65 N, 3871.02 E) - Point 14-32A T2 TD 0.00 0.00 8,860.00 -777.92 -1,015.54 5,939,577.430 674,150.480 70° 14'26.346 N 148° 35'36.726 W - plan misses tamet center by 5492 60usft at 10100.00usft MD (8534.42 TVD 2060_61 N, 3675.45 E) 'W2412017 4:27:16PM Page 6 COMPASS 5000.1 Build 81B by5104„1P BP BP Coil Tubing Report Company: North America - ALASKA - BP TVD Reference: Mean Sea Level Project Prudhoe Bay North Reference: True Site: PB DS 14 Database: EDM R5K-Alaska PROD - ANCP1 Well: 14-32 4.500 4.500 Wellbore: 14-32A 2.875 4.250 Design: 14-32A WP03 - Point 14-32A Polygon 0.00 0.00 -69.00 3,960.51 - plan misses target center by 8636.79usft at 10100.00usft MD (8534.42 TVD, 2060.61 N, 3675.45 E) - Polygon Point 1 -69.00 0.00 Point -69.00 -285.42 Point -69.00 -1,369.29 Point -69.00 -1,042.50 Points -69.00 0.00 Casing Points 2,996.92 0.00 663.79 936.26 219.17 0.00 RAW BAKER HUGHES Local Co-ordinate Reference: Well 14-32 TVD Reference: Mean Sea Level MD Reference: 54 : 32 8/5/1983 00:00 @ 69.00usft (generic drilling ng) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD - ANCP1 5,944,407.500 678,051.500 70° 15' 12.943 N 148° 33'40.033 W 5,944,407.50 678,051.50 5,944,137.60 678,721.70 5,943,060.42 679,019.26 5,943,370.44 678,294.82 5,944,407.50 678,051.50 Measured Vertical Casing Hole Depth Depth Diameter Diameter (usR) Wall) Name lin) (in) 10,230.00 8,652.52 7"X4-1/2"Planned TOWS 4.500 4.500 12,366.00 8,825.38 2-7/8" 2.875 4.250 524/2017 4:21:16PM Page 7 COMPASS 5000.1 Build 81B •s bp BP ►/.11 saw p BP Coil Tubing Report OMER (usft) (usft) HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-32 Project Prudhoe Bay ND Reference: Mean Sea Level Site: PB DS 14 MD Reference: 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) Well: 14-32 North Reference: True Wellbore: 14-32A Survey Calculation Method: Minimum Curvature Design: 14-32A WP03 Database: EDM RSK-Alaske PROD - ANCP7 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E? -W (usft) (usft) (usft) (usft) Comment 10,100.00 8,534.42 2,060.61 3,675.45 14-32AActual Survey 10,200.00 8,625.25 2,072.48 3,715.56 14-32AActual Survey TIP 10,230.00 8,652.52 2,076.22 3,727.49 KOP 10,250.00 8,670.57 2,078.78 3,735.71 End 9deg/10011 10,290.00 8,703.88 2,085.29 3,756.68 5 10,436.74 8,763.84 2,143.01 3,871.59 6 10,714.59 8,763.84 2,385.91 3,908.42 End 35deg/100ft 10,894.59 8,763.84 2,542.11 3,821.13 8 11,000.09 8,763.84 2,637.74 3,777.08 9 11,151.15 8,786.10 2,769.18 3,707.38 10 11,271.15 8,821.19 2,866.00 3,646.40 11 11,451.15 8,873.82 3,016.39 3,564.96 12 11,568.15 8,908.02 3,117.94 3,518.72 13 11,718.34 8,930.16 3,247.67 3,447.64 14 11,807.08 8,922.43 3,328.35 3,411.84 15 11,947.08 8,898.12 3,461.90 3,379.69 16 12,166.62 8,860.00 3,665.22 3,312.11 17 12,366.00 8,825.38 3,848.79 3,246.69 TO at 12366.00 Checked By: Approved By: Date: I 524/2017 4: 21: 16PM Page 6 COMPASS 5000.1 Build 81B Pmlecl: Prudhoe aaYuTi :n WELLBORE DETAILS: 14-322 nErE>sEucEwraualwx Obp Slle: PB Ds 19Coa4.(k6il x.lm W911432Trae6bT W� t uyr wn Parent e M ore 14-32 4nprms4iXa� ne Dn �: 10100.00 vnxa1rv01xm:�aa® wb.,PAIND Wellbore: 14:12.0 a'Da°ie°e vvl0°im�i s�ma.p rwrere sal-IDwx, o.ao0 HUGHES PMn:14a2AWPo3(1432'143TA) u,exemx®� u.ui.a Dapm neleie� 54 32 d519Aa0W®®aa naercncaa0rvl NES -_ _ ___ CaIVNWn I.bWL. µrvmunCvnp4e 8520- 8580- 86 1 871p 6"160' 8820- 8880 8940 9000- 9060' Mean Sea Level 9120 JIM, 1132A Aclval Survc3 TI P KOP EM9ecX/10071 14-32ATI 6 61' 14-32A WP03 49011 14-]2.0 Pau112 1472.0 Fanl13 , 4200 j4gXb p 1437AT3 0 32011 14-31APab111 0 O ' WXI k 2W() 32A 241X1'. ZHO 14-32ATI IXW',.. 16110 IBIp 2000 2200 241p ±600 281B ]000 3]110 34x1 7600 3800 4009 4200 4400 4600 4800 M 52 West( -)Bast(+) (200 usfttin) 14-32A WP03 14-32ATI Entlistle4/IOOIt A 9 II 14 14-32AT3 _ 14-37!&4-32.0 M.12366 W U 1980 9X10 2100 2160 2 _.-.......R--. 15611 1620 1680 17411 IXUI (8611 IHS IID 2280 23G1 2400 2460 25211 2580 2640 27011 2]6.01 2tl20 2880 294!1 301111 3060 3120 3180 3240 3300 3)611 3420 34.90 3540 360(1 3660 3720 Vertical Section at 350.00° (60usB/in) WELL DETAILS: 14-32 (bourdl el'. 30.93 .W -s .ELW 34044:. Eaah, WMExca IArylSltle SIO OAJ DAO 5940378685 675147103 70.14'33.997N 14B°35 -7.205W SECTBOMDETALS AKNOTATI MS See MD Inc Aa STVD +MFS .EFW Do TFare VSad Target TO MD An Dtatm 1 10100.00 24.78 74.57 8534.42 1060.61 3675.15 0.00 0.00 1391.07 8534.421D100.00 1432AAcWMSwM 2 1020000 24.66 72.45 8625.25 2072.48 3715.56 0.89 .97.401395.80 8675.25 10200.00 1432AActual Sur&y TIP 3 10230.00 24.59 72.74 865252 2076.22 3727.49 0.50 126201397.41 86525110230.00 KOP 4 10250.00 26.39 7274 8670.51 2078.78 3735.71 9.00 0.00 1398.50 8670.57 10250.00 End 98e9M000 5 10290.00 40.39 72.74 870328 208529 375628 35.00 0.00 1401.27 8703.88 10290.00 5 6 10436.74 9D.00 57.25 8763.84 2143.01 367159 35.00 .20.00 1431116 8763.84 10036.74 6 7 1071459 ROD 320.00 8763.84 2385.91 3908.42 35.00 -90.001670.97 8763.84 10714.59 Erd358ey10D8 B 10894.59 90.00 341.00 8763.84 2542.11 3821.13 12.00 90.00 1839.96 8763.84 10894.59 8 9 11000.09 90.00 328.94 8763A4 2637.74 3777.08 12.00 .90.00 1941.78 6763.84 11000.00 9 10 11151.15 73.00 335.33 8786.10 2769.18 3707.38 12.00 160.00 208333 8786.10 11151.15 10 11 11271.15 73.00 320.27 8821.19 2866.00 3646.40 12.00 -90.00 218927 8821.19 11271.15 11 12 11451.15 73.00 342.86 887332 3016.39 3564.96 12.00 90.00 2351.52 8973.82 11451.15 12 13 11568.15 73.00 328.18 890BA2 3117.94 3518.72 12.00 .90.00 2459.55 8908.02 11558.15 13 14 11718.34 90.00 334.25 8930.16 3247.67 3447.64 12.00 20.00 2599.65 0930.16 11718.34 14 15 11807.08 100.00 337.93 8922.43 332836 3411.84 12.00 20.00 2685.33 892243 11807.08 15 16 1194748 100.00 355AO 8098.12 3461.90 3379.69 12.00 90.00 2822.43 BOR12 11947.08 16 17 1216632 100.00 32823 8060.00 366522 3312.11 12.00 -90.00 3034.39 8860.00 12166.62 17 18 12366.00 100.00 352.54 8825.38 3848.79 3246.69 12.00 90.00 322654 8825.38 12366.00 TO 112366.00 8520- 8580- 86 1 871p 6"160' 8820- 8880 8940 9000- 9060' Mean Sea Level 9120 JIM, 1132A Aclval Survc3 TI P KOP EM9ecX/10071 14-32ATI 6 61' 14-32A WP03 49011 14-]2.0 Pau112 1472.0 Fanl13 , 4200 j4gXb p 1437AT3 0 32011 14-31APab111 0 O ' WXI k 2W() 32A 241X1'. ZHO 14-32ATI IXW',.. 16110 IBIp 2000 2200 241p ±600 281B ]000 3]110 34x1 7600 3800 4009 4200 4400 4600 4800 M 52 West( -)Bast(+) (200 usfttin) 14-32A WP03 14-32ATI Entlistle4/IOOIt A 9 II 14 14-32AT3 _ 14-37!&4-32.0 M.12366 W U 1980 9X10 2100 2160 2 _.-.......R--. 15611 1620 1680 17411 IXUI (8611 IHS IID 2280 23G1 2400 2460 25211 2580 2640 27011 2]6.01 2tl20 2880 294!1 301111 3060 3120 3180 3240 3300 3)611 3420 34.90 3540 360(1 3660 3720 Vertical Section at 350.00° (60usB/in) Protect: Prutlhee Bay °�TM'y,, I"�'"n WELLBORE DETAILS: 1a32A rffB&EneEwfoXFwlplx Site: PB DS IQ Obpu�mer� Parrot Wegbare: tb32 �m^�ll�b weB IaJR.Tro NOA Mel Fag Well: 1a — — - aupvsnurn Tiew MD: tOt00.Op vaBmmolX N.0 sm Leel Wellbore: l (13 upudxmm ssBc�Nslwlere ebt-Io6BBt Ba[el RAKER PIM:1a8iA WPW (143?/1a3PA) A� M211 I.ffimM oqT WMm 5<.318511BBJW 0069 WicB(gmmctliJing ig "h °� " " °m "'Wre HUGHES Mean See Lel West( -)Bast(+) (100 usftlin) Project: Prudhoe Bay Site: PB DS 14 Well: 14-32 Wellbore: 14-32A Plan: 14-32A WP03 (14-32i14.32A) ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature Depth Range From: 10100.00 To 12366.00 Emor System: ISCWSA Results Limited By: Centre Distance: 1433.85 Scan Method: Tray. Cylinder North Reference: Plan: 14-32A WP03 (14-WI4-32A) Emir Surface: Elliptical Conic NO 119 HKUGHES LEGEND -• 10.04, 1601, 1"4 V3 10.04, 1"0 . IaW V3 1439. 1433A. Mm B Vo 1433, 10.33A, 1433A V0 a 14 3, 1401, 10.03 V1 1403. 703A, 10.03A VI +- 14Y2. 1432. 10.32 VI r 380 360 340 320 300 280 260 c 240 N c,220 14-03A w200 N m m 180 U 0 m 160 e m O 140- 40 120- 120Possible PossibleOffset Well 100 Magnetic Interference: 6o From To KOP 10,360' MD 14-03A 66 40 14-32 20 0 O O O O O O O O O O O O 00 4 O O O m O O O O O O O O O O O O O O O O O O O O O O O O O O Measured Depth (100 usttfin) NO 119 HKUGHES LEGEND -• 10.04, 1601, 1"4 V3 10.04, 1"0 . IaW V3 1439. 1433A. Mm B Vo 1433, 10.33A, 1433A V0 a 14 3, 1401, 10.03 V1 1403. 703A, 10.03A VI +- 14Y2. 1432. 10.32 VI 120 14-03A Jose Va7guez-Tech5Wpo1P I Project: Prudhoe Bay • 1k&aG€aM, 9ao4 ANTI -COLLISION SETTINGS COMPANY DETAILS: Noah America - ALASKA -BP11111. .�.. 0 40' Site: pg DS 14 1403.1am, 1403 Tai Sturdivant-DD Coordinator 2 0 907-205-6294 Cell Phone 100 - "32, 1. bp 180 Interpolation interval: 25.00BMN Calculation Method: Minimum Curvalure 714-3 From: Range From: 101 Depths 12388.3. Error System: Scan Method: ISCWSA Tray. Cylinder Noah NWHES lbore Wellbore: 1432.0 Lii Results Limited By: Centre Distance: 1433.85 Centre Di to YV�7i�7 PIan:1432AWP03 (7432/7432.0) Reference: Plan: 14-32A WP03 1432/1432.0 ( ) Error Surface: Elliptical Conic Warning Method: Runts Based- ased From "our o 10100- 10100 -103fi0 .tw .aw h. tonal: a0.63 xwa ea= mn4uaw set Depth Range: 10100.00 To 12366.00 - 3.910N '� `�'""� '°"` 1 '� W 10360 10450 Sec MD IIIc Azi TVd -, DIY -S •FJ -W DI69 TFam vs.t Possible Magnetic Interference. 1 10100.00 24.]8 74.57 8534.42 2060.61 36]5.45 0.00 0.00 1391.0] From KOP to 10,360' MD = 00 10450 11600 2 1"200.00 24.66 72.45 8625.25 2072.48 3715.56 0.89 -1)7.40 1395.80 340-" 1 11600 11900 4 10250.00 24.59 72.74 8652.52 28.39 72.74 8670.57 W76M 2070.70 3]35. 9]18 6.80 9.00 120.00 1307.41 1398.50 9D 5 10290.00 40.39 72.74 8703.88 2085.29 3756.68 35.00 0.00 1401.2] 11900 12250 6 10436.74 90.00 57.25 8763.84 2143.01 3871.59 35.00 -20.00 1438.16 7 10]14.59 90.00 320.00 8763.84 2385.91 3908.42 35.00 -90.00 1670.97 12250 12366 8 10094.59 MAO 341.60 0763.84 2542.11 3821.13 12.00 90.00 1839.96 32 80 0 9 11000.09 90.00 328.94 8]63.04 2637.74 3MAB 12.00 -9".0" 1941.78 10 11151.15 ]3.00 335.33 B]Bfi.10 2769.18 3]0].30 12.00 160.00 2083.33 11 11271.15 ]3.00 320.27 8821.19 2866.00 3046.40 12.00 -90.00 2189.27 1211451.15 73.00 342.86 88]3.82 3016,39 3564.96 12.00 80.00 2351.52 13 11568.15 MAO 928.18 8908.02 3117.94 3518.72 12.00 410.00 2459.55 14 11718.34 90.00 334.25 8930.16 3247.67 W7.64 12.00 20.00 2599.65 15 1180].08 100.00 337.93 8922.43 3320.38 3411.84 12.00 20.00 2685.33 0 1fi 11947.08 100.00 355.110 8898.12 3461.90 3379.69 12.00 90.00 2822.43 17 12166.62 100.00 32823 8860.00 3665.22 3312.11 12.00 -90.00 3034.39 10 12366.00 100.00 352.54 8825.38 3840.79 3246.69 12.00 90.00 3226.54 30 0 50 SUPVEYVPOG+VJA OW:91J[916r00:0000 VdYle]:Y Nrsarc 40 eepn Fqn Dao To as g,P an T.1 100.00 10100.00 snmh .(,*aa aria IO100,OJ 1966.00 M. wrvouFva MWD 30 120 14-03A Jose Va7guez-Tech5Wpo1P I 80 40 - • 1k&aG€aM, 9ao4 114410-4339 Cel P,°ne -� 1401, taoaq 1« 907-341-1604 Emergency -,. 14m,+494, titin yasha Ragcningh-Survey Manager 0 �� 1443, 149.0, 144 90742-2436 CelPhane 1403.1am, 1403 Tai Sturdivant-DD Coordinator 2 0 907-205-6294 Cell Phone 100 - "32, 1. Patrick Rider -MWD Coordinator 907-952-3497 Car Phone 180 Cad Ulrich - Operatiors m0"19WAzimuth from North [ q vs Centre to Centre Separation [10 usfUin] 907-3825534 Cet Phone Azimuth from Noah [1vs Centre to Centre Separation [40 usftlin] North America - ALASKA - BP Prudhoe Bay PB DS 14 14-32 USA00000829 14-32A 14-32A WP03 Travelling Cylinder Report 24 May, 2017 AFig BAKER HUGHES •• BP % r p Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset ND Reference: FIRS NuGMs Well 14-32 Mean Sea Level 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 14-32AVVP03 =filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+100/1000 of reference Depth nterpolation Method: MD Interval 25.00usR Error Model: ISCWSA )epth Range: 10,100.00 to 12,366.0lusft Scan Method: Trent. Cylinder North Results Limited by: Maximum center-centsr distance of 1,433 85 usft Error Surface: Elliptical Conic Survey Tool Program Date 5/24/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,100.00 SIGMA -Gyro (14-32) SRG Conventional SRG single shots 10,100.00 12,366.00 14-32A WP03(14-32A) MWD MWD - Standard Casing Point Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,493.00 2,423.90 133/8" 13.375 17.500 10,088.00 8,523.53 95/8" 9.625 12.250 10,230.00 8,652.52 7" X4-112" Planned TOWS 4.500 4.500 12,366.00 8,825.39 2-7/8" 2.875 4.250 Summary PB DS 14- 14-03-14-03-14-03 Reference Offset Centre to No -Go Allowable Rub Asegiel:Mnor1/200 Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) Reference (usft) Toogacae PS DS 14 Centra casing- Cenrem WGo Allowable Waming Depth Depth 14-03-14-03-14-03 12,310.55 11,600.00 404.89 35.44 397.16 Pass - Minor 1/200 14 -03 -14 -03A -14-03A 12,004.05 11,850.00 65.69 8.19 62.53 Pass - Minor l/100 14-04 - 14-04 -14-04 12,075.00 11,200.00 1,205.24 316.68 900.62 Pass - Major Risk 14 -04 -14 -04A -14-04A 12,075.00 11,200.00 1,205.24 316.68 900.62 Pass -Major Risk 14.31 - 14-31 - 14-31 3,147.78 2,146.99 3.687 1421,49 35.29 Out of range 14-32-14-32-14-32 10,402.65 10,475.00 116.86 0.64 116.86 Pass-NOERRORS 14-33 - 14-33 - 14-33 3.687 11398.50 35.24 1.389.27 Pas.-Minor1I200 12,250.00 88&5.53 Out of range 14 -33 -14 -33A -14-33A 11,022.42 13,879.00 954.45 180.93 785.76 Pass - Major Risk 14-33 - 14-33A - Plan 8 11,000.09 13,883.19 893.55 179.66 725.42 Pass - Major Risk 14-34 - 14-34 - 14-34 -8578 3.186.82 2,185.02 3582 1,352.70 Out of range 14-34 - 14-34PB2 - 14-34PB2 Out of range 14-41 - 14-41 - 1441 Out of range Offset Design PB DS 14- 14-03-14-03-14-03 omst she enor. ODD "it Survey Program: 100BLIND,5 CB -GYRO -MS Rub Asegiel:Mnor1/200 Mesa gMlErtor. offluell Reference Me" Semi MajorAus Measured Vertical Measured Verfical Reference Went Toogacae Offset Wellbore Centra casing- Cenrem WGo Allowable Waming Depth Depth Depth GePtb Azimuth eW4 6 1_w Hot. Si# Centre Distance Deviation (usft) lest lust Juan) (us") Nee) 19 Ivat user) (oh) (ase) Iveh) lash) 12,250.00 0,00.5.53 10.200.00 8.214.14 21823 255.21 4&.52 3,147.78 2,146.99 3.687 1421,49 35.29 1.421.19 Pass -Minor 11200 12,250.00 8.146W 10.225.00 8.231.91 21823 2513.35 .85x0 3.150.16 2.159.47 3.687 11398.50 35.24 1.389.27 Pas.-Minor1I200 12,250.00 88&5.53 10,25000 8,24958 21023 25749 85.38 3.172.50 2,172.15 3.562 137565 32.79 1,31535 Pass -Minor 1/200 12,250.00 8.845.53 10,275.00 8,267.12 21823 258.63 -8578 3.186.82 2,185.02 3582 1,352.70 32.74 1,352.40 Pass - Minor 1/200 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 5242017 3:56:47PM Page 2 COMPASS 5000.1 Build 816 �• b BP p Travelling Cylinder Report Company: North America -ALASKA -BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset TVD Reference: ri.V HKER UGHES Well 14-32 Mean Sea Level 54 : 32 8/5/1983 00:00 @ 69.00usft (gemnc drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 14 - 14-03 - 14-03 - 14-03 Dttaet see Emor. ON am Survey Program: 10oBLIND, 50DCB-GYRO-MS Rule Assigned: Minor 1200 Offset Well Elrx. 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured vertical Reference Offset 1R.Kne♦ Offset VaellSen Centre caMn9- centre to No Ge AlbnaMa Morning Depth Depth Depth Depth Aumutt 197E 4EI M eeM6Ve Centre Distance Deflation luaal (um (ase) (use Penn lutea) r) (usft) Into (in) Iasn1 lu.el (Port) 12,250.00 8,84553 10,300.00 8,284.55 218.23 259." -86.17 3.197.10 2,190.08 3.fiW 1,329.]3 32.68 1.329.43 Pus - Minor 120 12,250.00 8,845.53 10.32500 8,301.83 21823 280.97 -88.58 3.208.35 2,21134 3.562 1,30634 32.62 1.308.44 Pus -Minor 1200 12,250.00 0,845.53 1035000 8.31897 21823 262.17 -in 98 3,221.59 221.4.82 3.562 1,283.72 W$6 1.283.42 Pus -Mina 1200 12,250.00 8,815.53 10.375.00 8,335.94 21813 283.38 -87.39 3,233.81 2,238.52 3.582 1.260.66 3250 1,260.37 Pass -Minor 1200 12,250.00 BMW 10,400.00 8,352.75 21823 26458 487.00 3,24601 2,25243 3562 1,23158 32.44 1,23728 Pass - Mina 1200 12.25000 8,845.53 10425.00 8,369.43 21023 265.B5 -08.23 3,258.19 2.266.51 3,562 1,214.49 32.38 1,214.19 Pass - Minor 1200 1225000 8.845.53 10,450.00 sM 04 218.23 267.11 488.66 3,2]033 2.280.0 3.562 1,19143 32.31 1,181.13 Peu-Minort200 12,25000 8,845.53 10,47500 8,402.57 218.23 260.37 -89.10 3,282.51 2.294.99 3.562 1,160.39 32.24 1, 181109 Pees - Minor 1200 12,250.00 894553 10,50000 0,419.01 218.23 Me 64 -9955 3,294.65 2,309.39 3.562 1,145.30 32.18 1.145.00 Pus - Minor 12110 12,250.00 0,84553 10.52500 8.435.44 21823 Met -9003 3.306.78 2.323.82 3.562 1,122.41 32.11 1.122.14 Pus -Mina 1200 12,2$.00 8.80.5.53 10,55000 8451.93 21823 272.18 -90.52 3,318.84 2,31121 3.562 1,099.61 32.05 1099.31 Pus -Mina 1200 12,258.64 8844.03 10.575.00 8,46849 21823 27346 -09.01 3.330.88 2,352.56 3582 1,07680 32.06 1,076.50 Pau - Minor 11200 12,25959 3,613.85 10.600.00 assail 21023 274.73 -90.21 3.342.00 2,308.87 3562 1,051.21 32.90 1,05391 Pass - Minor 1200 1226076 8M,66 10,62500 8,501]4 218.23 27800 -90.63 3]5185 2,381.19 3.582 1,031.71 Mae 103142 Pass - Minor 12W 4.281.02 8.84348 10,650.00 8,518.36 218.23 277.26 -91.07 3,366.M 2395.58 3,562 1,00.31 32.99 1,009.01 Pan - Minor 1200 12262.90 8.84329 10,675.00 8531.98 21823 278.53 -91.54 3,37882 2,41003 3.582 986.99 33.03 98889 Pus - Min. 1200 12,263.97 8,843.11 10)0.00 8,551.53 21823 279.80 -92.03 3,390.43 2.42455 3.562 864.77 33.08 98447 Pus - Menr 1,200 12265.01 BMW 10,]25.0 8.568.08 21823 281.08 -92.55 3.402.16 2,439.16 3.562 94283 MAI 942.33 Pus -Mina 1200 12.266.09 8,012.]4 10.75000 8.56%.58 218.23 28238 .93.10 3.413.78 2,453.91 3.562 920.57 33.14 920.27 Pan -MIrer 11200 12257.12 BMW 10.7`7500 8,601.05 21023 28384 -9360 3.425.30 2,460.78 3,582 888.60 33.18 89080 Pau-Minar120 12,275.00 8,841.19 10.600.0 8.64.0 218.23 284.93 -0.31 3436.71 2,483.]9 3.562 BMW 33.60 876.50 Pass - Minor 11100 1227500 8.841.19 10,8250 0,603.85 21823 29723 -94.10 3.118.04 2,40.0 3562 Mot 33.75 85171 Pass - Minor 120 12,275.00 8.841.19 10,850.0 6,850.19 21823 287 53 -94.93 3.459.33 2,51408 3.562 833.36 33.69 8330 Pass - Mina 120 12,25.00 8,841.19 10,0]5.0 8,888.49 21823 MAD -95.80 3470.57 2,52]34 3.582 81186 33.63 811%Pass -Minor 120 12,2]5.0 8,941.19 10,90.0 868175 21823 290.13 -96]2 3,481n 2511.69 3.562 790.52 Ban 79022 Pass - Minor 112W 12.275.00 8,841.19 10.925.W 8.695.96 21823 291.45 -97AB a4295 $597.00 3562 M9.36 33.51 7690 Put -Minw 112M 12,275.00 8,041.19 10,960.00 8715.14 21023 29279 -98.60 3504.16 2.575.50 3,552 748.41 3345 MAI Pau - Minor 1200 12,2750 8841.19 10.975.00 8.73117 218.23 294.12 -99.75 3.515.30 2,590.95 3.582 ]2].69 33.39 727.39 Pass - Minor 1200 12,2750 8841.19 11,000.00 8,747,36 218.23 295.45 -10.87 3,526.63 2,606.43 3.552 ML22 3333 706.92 Pass -Minor 120 12275.00 8.841.19 11,025.00 8,763.42 21823 298.81 -1020 3,537.89 282193 3.582 687.02 33.26 686.84 Pass - Minor 120 12,2]5.00 8811.19 11,050.0 8.779.48 21823 298.17 -10331 3,549.17 2,0745 3582 687.14 33.20 665"Pass -Mina 1200 12,2]5.00 8,611.19 11,075.00 8,795.47 21823 299.53 -IN" 3,56045 2,852.90 3582 841$ 33.14 54].30 Pus - Mina 11200 12.28167 0,840.0 11,10.00 8,81147 21823 30.09 -105.10 3,871.74 2.688.52 3.562 62834 3386 82805 Put - Minor 1200 12.283.0 8,039.80 11,12500 8,827.0 21023 30225 -10.40 3,58300 2.681.0 3.582 60.54 Ban 80.25 Pus-Minor11260 12,284.41 8,039.56 11,15000 884349 21023 3061 -107.80 3,597.18 2,59969 3.582 591.18 Ban SW.89 Pau - Minor 1200 12.285.79 8,83932 11,175.00 8.85952 218.23 304.90 -10929 3.60528 2,715.32 3.562 5MI 33M 57301 Pau -Minor 1200 12187.18 8,839.08 11200.97 8,875.58 218.23 39734 -1100 381631 2.73099 3.562 55597 Bass 55537 Pass - Minor 1200 12,28855 8,830.84 112250 0,89167 218.23 307,68 -11282 3,62721 2,746.72 3.562 53921 33.93 53827 Pass - Minor 1200 12,28990 8.838.80 11,250.00 0,947.01 21823 We 02 -11446 3.637.96 2,762.50 3562 523m 3398 521.79 Pass - Minor Woo 12,9121 8,838.37 11.275.00 BMW 21923 310M -116.44 3.610.55 2,770.35 3562 50708 31.0 505.98 Pus - Minor l2Da 12,292.48 0,830.15 11,300.00 aND20 21823 311]0 -118.56 3.650.99 2791.26 3.552 40.00 34.07 490.0 Pus - Minor 1200 12,29375 0,03193 11,325.00 8,95644 21823 31303 -120.81 3.669.32 2,810.21 3.552 479.18 34.11 47567 Pau - Minor 11200 12,29505 8.83771 11.350.00 89T2.67 21823 314.35 -12321 3,679.0 2,026.19 3.562 46628 34.15 463.32 Pass - Minor 1200 12,30097 8.836.05 11,37500 8,988.91 218.23 315.0 -125.22 3,80989 2,84.19 3562 454.37 35.28 4500 Pass - Minor l2W 4,30000 aliases 11,400.0 9005.14 21823 31101 -128.07 3,700 12 2.08.21 3562 44349 3524 43981 Peas - Minor 12W 12.30000 8,836.85 11,450 9,021.39 21823 318.34 -131.97 3710.33 2.87024 3.562 43397 3522 42942 Past - Min. 12W 12.300 00 8,8]8.85 1145097 9.03186 21823 319.66 -184.18 3,40.53 2.890.25 3.562 425.37 3520 420.51 Pun - Mina 11200 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 5242017 3:56:47PM Page 3 COMPASS 5000.1 Build 81B _,.. BP ICI\ S p Travelling Cylinder Report BAKER HUGHES b Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00 usft Reference Well: 14-32 Well Error: 0.00 thrift Reference Wellbore 14-32A Reference Design: 14-32A 'Al Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-32 Mean See Level 54. 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PB DS 14 - 14-03 -14-03 - 14-03 o Sib Eve[ 000 use survey Program: 100,81LIND. 500.C8 -GYRO -MB Rule Assigned: Minor 11200 Oaxt Well Ertor: Doing Reference Glrset Semi Myo, Axis Measured Vertical Measured Vaisal ReNrenw Onset T,OBacea Olbet Wdlbote cetdre Cade,- cut. to NO Go Alienable blaming Depth Dearth Depth Depth AdmuM ♦111.9 aELW Nowa. Centre Distance Deviates lush) (ust) (uxe) (usg) lust) (usnl r) lusn) lusMl (in) Juane (usnl lust) 12,300.00 883885 11675.00 9053.95 21823 320.99 -137.42 3.7M,72 2,908.24 3,562 41330 35.18 49294 Pass -Minor 1Y10 12,300,00 8,838.85 11,50.00 9.07125 21823 322.32 -14075 3.740.90 2,922.22 3582 412.65 35.16 406.79 Pus - Minor 1/20 12,30535 8835.92 11.525.00 9,085.58 21823 32364 -14341 3,751.08 2,938.20 3.562 408.41 35.0 402.0 Pass -Minor 120 12307,04 883563 11.50.0 9,102.93 218.23 324.96 -14685 3,761.17 2,954.18 3.582 405.70 35.37 39087 Pus - Minor 11200 12,308.71 8035.33 11,575.0 9,119.31 218.23 326.29 -149.91 3,]]1.23 2,9]0.1] 3.562 404.52 35.41 39123 Pass - Minor 1120, CC 12,310.55 8,035.02 11,800,0 9,13510 21823 32)81 -153.17 3,78125 2,988.17 3562 40489 3544 397,16 Path -Min. 1120, ES. SF 12,31238 8.834.70 11,fi250 9,152.11 218,M 32803 -158.41 3,79121 3,02.19 3582 40618 3547 39688 Pau -Min. 11200 12.31423 8.834.38 11,850.00 9,168.55 21823 33024 45059 3,80107 3,018.24 3,582 41018 35.50 401,611 Pau -Min. 1120 12,318.11 8,834.05 11,67500 9.185-01 21823 331.56 -10271 3.81084 3.034.32 3,552 41505 35.53 411823 Pass - Minor 11200 12,31803 8,833]2 11.70.00 9.20119 21023 332.57 -185.]3 3,a0.53 3,050.43 3562 421.34 3695 41223 Pass -Minor 11200 12.320.05 8.83337 11,]25.00 9,217.97 21823 33329 468.63 3.830.21 3,066.54 3.5112 428.0 3856 41981 Pass - Min. 11200 12.32046 8.833.29 11,]30.00 9,221.27 218.23 333.43 -169.19 3,832.15 3,069.]6 3.562 430.66 38M 42125 Pass -Minor 1Y200 Final CC - Min centre to center distance or covergent point, SP - min separation factor, ES - min ellipse separation 5242017 3:56:47PM Page 4 COMPASS 5000.1 Build 618 ri.I HKER UGHES Well 14-32 Mean Sea Level 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 -14 -03 -14 -03A -14-03A BP p Travelling Cylinder Report N.J Gesels6e El.er- ow as Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 usft Output errons are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset TVD Reference: ri.I HKER UGHES Well 14-32 Mean Sea Level 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 -14 -03 -14 -03A -14-03A Gesels6e El.er- ow as Survey Program: 100 BLIND, SMCS-GYRO-44$1108 hfii Rule Assigned: Minor 11100 Oftst Well Ener. 0.00 at Reference Oesar Bend Major An, Measured Vertical Measured Y.M.1 mw loans. bank Million Certhe C4sing- can.W No Go Allowable Wam9M Cash bels, cash cash Azimuth .NIS .E1 -W Mole Bee Cara oislanw Deviation )Yep )usftl (aft) into (not flap f) (aft) (SNI (M) tYar6 (aft) laft) 11.643,58 8.92467 12,263.00 8971.94 21820 297139 72.62 3.289.83 3594.33 3582 24329 320 24060 Pass - Minor 11100 11,656.15 8,926.37 12,250.00 S n," 21820 297 36 T3.% 329]48 368384 3582 23781 185 237,31 Pas -Minor 1/100 11,600.14 8,928.75 12,225.00 8,973.30 21820 29732 74.14 3.312.19 3.65385 3562 228.54 498 228.24 Paas-Minar11100 11,70373 8,929.98 12,20000 8.973.90 218M 29732 75.48 3,3%.76 3,643.34 3.5M 215.00 530 214.79 Pass - Minor 111W 11,72717 0,93)11 12,175 DO 8.974.02 21820 29732 77.08 3.34180 3,623.22 3562 203.71 B2] 203.41 Pass - Minor 11100 M750.41 8,929.18 12,15000 8,974.08 21820 29782 79.09 3,358.80 3,803.28 3.502 192.09 5% 192.19 Pas - Minor 11100 11]7323 8,927.23 12,125.00 8,97400 21820 29732 01.55 3,371.94 3,583.47 3.552 18139 6,18 191.10 Pan - Minor 11100 11,79562 8,92432 12.100.00 8.973,60 21820 297.32 8445 3,387.40 3,58133 3.57 17050 845 17020 Pass - Minor 11100 11.82231 8,919.82 12,075.00 8,972.69 21820 29732 09.43 3,40306 3,54437 3 e 1597!1 577 15940 Pass -Minor V100 11.851]9 8,91430 12,050.00 8,97117 21520 297.33 030 3.41830 3.524.60 3.562 14751 7.10 147,21 Pass - Minor 1/100 11,87842 8,910.07 12025,0 8.969.37 21021 297,33 1033 3,433.07 3,500.53 3.562 13399 7.37 13370 Pass - Minor Ill Do 11902.30 8,90591 12.00000 8.965.96 218.21 297.33 11078 3.447,43 3,184.20 3,562 119.56 7.50 11927 Pass -Mina 11100 11,923.% 8,902.16 11,975.00 8984.17 21821 297.33 119.11 3.46152 3,463.74 3.562 104]9 7.75 104.50 Pass -Minor 11100 11.84324 8.898.81 11,950.00 8,961.22 218.21 297.33 129.09 3,475.22 3,443.04 3.562 90.31 7.87 90.01 Pass - Minor 11100 11,85795 0,a%.25 11.92500 8,958.39 21821 297.33 138.27 348942 3,422.00 3.562 77.41 7.% "Al Pas - Minor 11100 11,972.56 8.893.72 11,900.00 8,956.11 21821 29733 149.82 3,501.34 3,400.72 3.562 68.38 903 6807 Pus - Minor 11100 11,98795 8,891.05 11,07500 0,953.92 218M 29733 18395 3,51309 3,379.21 3.562 8420 8.11 8329 Pas - Minor 11100. CC 12,004.05 8,888.25 11,850.00 8,%181 21822 29733 17880 3,525,84 3,357.35 3.582 65.89 819 82.53 Pau - Minor 1/1 W. ES. SF 12,02103 8.885.30 11,825.00 8,949.87 21822 29733 -168.99 3,537.28 3,33511 3.562 72.35 627 67.40 Pas. - Minor 1/100 12,039.11 8,082.18 11,800.00 8.94796 21822 297.33 460.03 3,548.32 331256 3562 82.77 8.35 76.50 Pass - Minor 1/100 12,05339 8,879.83 11,.45.00 8.946.06 21822 29733 -154.18 3.558.81 3.290.25 3,552 95.54 043 80.55 Pas. - Minor l/100 12,078.95 8,07524 11,750.00 8.943.98 218.22 29733 -15072 3.569.01 3.267.52 3,562 109.40 850 101.89 Pass -Mi. 11100 12,101A0 8,87134 11]25.00 8.411.63 218.22 27.33 -149.09 3,579.81 3,244.73 3.552 123.59 SSB 115.72 Pass - Mina 11100 12,125.54 8.867.15 11.700.00 8,09.16 218.22 297.33 -108.70 3.58862 3,221.78 1562 137.90 9.64 129.77 Pass - Minor 11100 12.151.25 8.86268 11,75.00 8,936,72 21822 297.33 -14947 6,5111'.51 sia's5 3.502 152.30 670 14399 Pass - Mina 111W 12.172.93 8,850.92 11,650.00 8,934.30 21522 297.33 -148,M 31641 3,17500 3.582 188.04 982 15832 Pess - Mina 1/100 4.186.76 8,858.52 11,625.00 8,932.06 21822 297.32 -140.18 3,612.07 3,15120 3.582 19243 902 17365 Ps. - Minor 111M 12,20000 0.854.22 11,80000 8,929.7 21822 29132 -14028 3619.38 3.127.18 3.582 199.15 9.19 19016 Pss - Minor 11100 12211.16 0,852.28 11,75% 8,927.25 21822 29732 -138.89 3625.30 3.10302 3.552 21683 am 2764 Pas - Minor 111W 12,22187 893)42 111550.00 0.924.75 21822 297.32 -13374 3,630.57 3,07871 3.562 23538 9.46 226.03 Pas- Minor 111M 12,23160 8,848.73 11525.00 0,92205 21822 297.32 -130.84 3,635.11 3,0549 3.562 254.71 9.57 24523 Pass - Minor 11100 12,240.52 8,84718 11,500.00 8.919.31 21822 297.32 -128.22 3.639.13 3,029.75 3.972 27/71 9.65 265.12 Pass - Minor 1/100 12.297.00 8.84553 10.200.00 8,214.14 210.23 255.21 -8462 3,14778 2,148.99 3.07 1,421.49 10.33 1,421.19 Pass - Minor 1/100 12.250.00 8.04553 10,225.00 8,231.92 218.23 2%.35 -85.00 3,180.16 2,159.47 367 1,3911.50 1033 1,39&9 Pass - Mina 1/100 4.250.00 8,84553 10,250.00 8.249.58 210.23 257.49 -038 31Y2.50 2,12.15 3.562 1.375.65 1032 1,37535 Pass - Minor 1/100 12.25000 8,845.53 10,27500 8,27.12 21823 258.83 -85,70 3,18482 2.185.02 3.582 1,352.70 1032 1,37 .4, Pass - Mina 11100 12.29700 8,845.53 10,300.00 8,284.55 21823 259.77 -98.17 3,17.10 2,198.08 3.582 138.73 10.32 1329.43 Pass - Minor 11100 12,25000 8,845.53 10,325.00 8,301.83 21823 Moan -81 3,209.35 2.21134 3.502 1,%.74 10.32 1,3%.44 Pss - Minor l/100 12,250.00 8,845.53 10,3s)00 831897 21823 26217 -86.98 3221.59 2.22482 3.582 1,283.72 10.32 1,28342 Pass Minor 11100 12,250% 8,845.53 10,37500 533594 21823 26338 -8739 323381 2.23852 3,562 1,280 a8 10.32 1,260.37 Pus - Minor 111W 12,25000 8.845.53 10.40000 8,352.75 218M 264.50 -0780 3246.01 2,252.43 3.562 1,237.58 10.32 1,237.28 Pus - Minor 111% 12250.00 8,845.53 10.42500 0.359.43 21823 26585 80.23 3,258.19 2,2%.51 3.562 1,214.49 10.32 1,214.19 Pus - Minor 1/100 12250.00 0845.53 10,45000 0.38604 21823 27.11 88.68 3,270.36 2,280.69 3.57 1,191.43 1032 1,191.13 Pus -Mina 1/100 12,25000 B.645.53 10,47500 8.402.57 210.23 268.37 -89.10 3282.51 2,294.99 3.582 1,168.39 10.32 1,168.09 Pau -Min. 11100 12,200.00 8,84553 10,500.00 8,419.01 21023 269.64 -89.55 3.264.65 2,309.39 3,562 1.145.39 1032 1,145.08 Pas -Mier 11100 12.297.00 8,84553 10,525.00 8,435.44 218.23 27091 -90.03 3.306.76 2.323.82 3.582 1122.44 10.32 1,122.14 Pau - Minor Ill 00 12,250.00 8,845.53 10,550.00 8,451.93 218.23 272.18 -%.52 3,31884 2,338.21 3.562 109961 1032 1,09931 Pass - Mina 1/100 CC - Min Centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation Y2412017 3:56:47PM Page 5 COMPASS 50001 Build 81B r�•.� PB DS 14 -14 -03 -14 -03A -14-03A BP S b Travelling Cylinder Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 Daft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 Daft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset ND Reference: ri.s HKM UGHES Well 14-32 Mean Sea Level 64: 32 8/5/1983 00:00 @ 69.00usft (generic cinlling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 -14 -03 -14 -03A -14-03A oNeet bite ERor. 0.00 Des survey Program: 100 -BLIND, 500.C"YR0.M8, 11065 -MWD Ruh Assigned: Minor 11100 ghat Well Eger. emusll Reference Orleet BemYMger Aab Measured Veniul Measured Violated Relse. West residue. Onset Welows centre cases- Co.. 19 No Go Allodable Vprnlm Depth Mine Death Depth kikwh Fli V.W Net. She centre Oistanu DeWmen lesRl histo (us#) lusm lusm poem fl lusm (um Iie1 1as15 less) 1a+n1 12.25000 8,845.53 11,47500 8.91688 21823 29731 -12512 3,55249 3.005.10 3582 29548 9.73 285.80 Pus -Minor 1/100 12.25508 8.844.51 11,450.00 8,91424 218.23 297.31 -12381 3,64527 2,900.39 3,562 31673 978 306.90 Pus - Minor 11100 12.25864 8.844.03 1057500 8.46849 21823 273.46 41981 3,330.88 2,352.56 3582 1.06680 10.32 1,076.50 Pus -Minor 11100 12,25969 8,843.85 10,506.00 SAW 11 218.23 274]3 -9021 3,342.88 2,368.87 3,562 1.054.21 m32 1,05391 Paea - Minor VII 12,260.76 0,Well 10,625.00 8,501.]4 21823 27600 -9063 3.354.85 2,381.19 3.562 1,031.71 10.32 1,03142 Pass Minor l/100 12,26182 5,843." 10.650.00 0,518.38 21823 277.26 -91.07 3,36816 2395.50 3562 1,00931 10.32 1,00601 Pass - Mimi 1/100 12252.48 8.W37 11,425.00 8,911.23 21823 297,31 -121.84 3,847,40 2,955.87 3.552 338.39 953 32850 Pus -Minor 1/1M 12,262.90 8,643.29 10,675.00 853598 218.23 278.53 -91.54 3,37862 2,41003 3.562 980.99 1032 8811.89 Pus-Minbr11100 12.281.97 8.843.11 10,700.00 8,55153 218.23 27980 -9203 3,390.43 2,424.55 3.562 964.77 1032 960.47 Pens -Minor 1/100 12.265.01 8,812.92 10,725.00 8,55808 218.23 28108 -92.55 3.402.16 2.439.16 3582 94263 10.32 942.33 Pass -Mina 11100 12,266.09 8,ad2.74 10.750.00 8,584.50 21823 282.35 -93.10 3.413.78 2,453.91 3.562 Me 57 10.32 9202] Paea- Mgor 11100 12,267.12 8842.58 10.]75.00 8,601.05 21823 263.84 -9380 342530 2488.78 3.552 890.60 10.32 89830 Pass Mlnrl/100 12,268.43 8842.33 1140000 8907.82 21823 29731 -11999 3,640.97 2,930.95 3.562 360.38 9.86 350.53 Pass - Mina 1/100 12,2MW 8,84119 10,80000 8,61].4] 21823 284.93 -93.31 3438]1 2,483.79 3.562 876.80 1032 878.50 Pus Minbr1l1o0 12,23`500 8.841.19 10,825.00 8,033.85 21823 28823 91.10 3,448.04 2.498.90 3.562 855.01 1032 855.]1 Pus - Minor 111M 12,2]500 8,541.19 10,850.00 8,650.19 21823 287.53 -94.93 3,459.33 251408 3.562 833.38 10.32 83305 Pus - Minor 111W 12,275.00 8,841.19 100]500 88131349 21823 280.83 -95.80 3.40.57 2.529.34 3552 slim 10.32 811.56 Pass-Mimrt/100 12,27500 0,841.19 10900.00 8,682]5 21823 290.13 -98.72 3.481]] 2,544.69 3.582 790.52 10.32 79022 Pass - Minot 1/100 12,27500 0,841.19 1892500 8,60% 21023 291.46 -97,88 3.492.95 2.560.08 3582 759.35 10.32 769.06 Pass-Minot/100 127/5.00 8041.19 10,95000 8.715.14 21823 29279 95.60 3,504.16 2,575.50 3582 748.41 10.82 748.11 Pass-Minorl/100 12.2]5.00 8841.19 10,975.00 8731.27 21823 294.12 -98.75 3,515.38 2,59D.95 3652 72769 ion ]2].39 Pain-MinalilM 12.275.00 8,841.19 11,000.00 8)47,36 218.23 29545 100,87 3,526.63 2,60843 3.562 707M lon ]06 92 Pass - Minor 1/100 12,2]5.00 8,1MIA9 11,025.00 8,76343 218.23 296.15 -in Do 3,53]89 462183 3,562 607,03 767 08429 Pass -Minor 1/100 12,275.00 8,841.19 11,050.00 8,779.50 21823 296.88 -103.31 3,549.14 2.637.42 3.582 667.17 7.91 88033 Paea - Minor 11100 12,275.00 8.841.19 11,075.00 8,795.56 21823 297.28 -104.88 8590.40 2,652.92 3.562 "I'M 948 63840 Pass-Minal/100 12,270.00 8,841.19 11,35000 edgers 21023 297,30 -117.11 3,850.42 280164 3.562 40518 959 39530 Pass-Minot/100 12,27500 8,841.19 11,375.00 8,904.03 21823 297.31 -118.10 3,850.01 2,906.26 3.582 38264 989 372.76 Pus Minor 1110 12.281.79 8.840.01 11,100.00 8,81119 218.23 29128 Achi 8 3.572.02 2,658.59 3.562 Man 9.53 618.81 Pus - Minor 1/100 12.282.84 8.839.83 11,325.00 3.894.73 218.23 297,30Aided) 3.819.89 2,857.16 3.582 42787 9.90 0797 Pus - Minor 11100 12,284.02 8,63982 11125.00 Snil62 21823 297,29 -108.02 3,585.18 2,885.04 3.532 606.03 9.57 59856 PusMinor1/100 12285.92 8,83929 11.150.00 8,8%.57 21823 297 29 -106.96 3,59159 2,703.14 3.582 586.87 9.62 57731 Pass - Memo 1/100 12,286.04 0,839.2] 11,300.00 8,808.55 21023 29130 -113.59 3.64769 283304 3,562 450.74 9.87 44085 Pass-Mimr1/100 12287" 0.839.03 11,175.00 8,847.33 21823 29729 -107.90 3,809.11 2,7M.33 3,552 564.99 957 555.38 Pass - Minor 111M 12,200.22 8.038.89 11.27500 8,881.51 21823 29]30 -112.19 3,80.1.89 2.50140 3.562 47375 9.65 461.89 Pass Minor 111M 12,288.77 5,838.80 11.20000 8,85].1] 21823 297%9 -108.85 3,821.13 2]4210 3.562 542]5 972 53305 Pus Minor 111W 12,28930 8.838.71 11,250.00 8,87405 21823 29129 -110.95 3,113162 2,786.33 3.582 495.91 9.81 48109 Pass -Minor 11100 12,289" 8,830.68 11,225.00 8,866.02 21823 297.29 -10980 3.628]0 2,764.03 3.582 520.00 977 51023 Pau-Mimrtllm CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 5@4/2017 3:56:47PM Page 6 COMPASS 5000.1 Build 81B I -�� BP i p Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset TVD Reference: FrAbs BAKER Well 14-32 Mean Sea Level 54: 32 81SM983 00:00 ® 69.00usft (generic drilling rig) Tore Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 - 14-04 - 14-04 - 14-04 ensnares Error: 000 a ft Survey Program: 8 -GCT -MS RuleAugAed: Major Risk Meet Well Error: 0.90 use Reference Dash Semi Major Axis Measured Vertical Measured Vainest Reference met TesMacer ORSMVMibors Cain Casing- Centres No Go Alloxable Marriott Depth Depth Depth DaPN ALmuU +Alq +VM Role size Centre Distance Deviation (ush) lien) (usft) (.sit) just) (U -ft) 0 loan) IasRI (is) lural (oan) lumj 12,%1.79 80]022 11,87500 8,57693 21822 55.11 58.56 3,975.25 4892.20 6937 1,42800 33763 1120.92 Pass - Major Risk 12,%251 80]8.10 11,9%.90 8,558.15 21822 SAW 57.64 3,969.08 4A74 72 6.937 1,41362 336.68 110599 Pus - Major Risk 12,063.24 807).9] 11,825.00 8,5419 21022 54.81 55.70 3,962.0 4.65728 6.937 1.399.58 33561 1,09151 Pass - Major Risk 12,063.99 8,67].84 11.80000 8524.42 21822 54.61 55.74 3,996.81 4,639.91 6.937 1.305.95 334.54 1.07.48 Paas -Major Risk 12.064.]6 8077.71 11375.90 S.W." 21822 54.49 5415 3,950.72 4,622.60 6.937 1,3]2.72 33345 1,063.89 Pass -Major Risk 12,011556 39".57 11,750500 8,490.40 21822 549 Mrs 39068 4,605.34 6,937 1,359.89 33235 1,05034 Pass - Maid Risk 12,065 37 8.877.43 11,725.00 8.47332 210.22 54.9 52.]2 3.9%6n 4,501.12 807 1,34745 331.24 1,038.03 Pass - Major Risk 12,075.00 8.875.93 11,075.00 8.907.55 218.22 50.34 M78 3.750.60 4,178.30 6.07 1,200.94 315.20 910.75 Pass - Maim Risk 12,07500 8,875.93 11,10000 8,028.14 218.22 5049 23.97 3,75857 4.19106 6937 1,40895 315" 901,37 Pass -Maim Risk 12,07500 8,875.93 11,12500 8,04469 216.22 5063 25.15 3,7%48 4205.01 607 1,205.57 31516 90454 Pas. - Maps Risk 12.075.90 8.875.93 11,150.00 8%3.18 218,M 507/ 28.31 3,"492 4,220.]2 6.07 1,204.80 316.06 902.58 Pass - Major Risk 12,075.00 6.875.93 11.175.00 8,081.59 21822 500 2].52 3,782.13 4,235.]2 8907 1,204 69 316.37 901.23 Pass - Major Risk. CG 12.07500 8.37593 11.200.00 8.09992 21822 5108 28.71 3,789.91 4,250.84 6.937 1.2%.24 31868 90082 Pass - Major Rink, ES, SF 12.075.011 8.87593 11.225.00 8.118.20 21822 5122 2990 3.79765 4,26A.W 8937 1,206.37 31698 900.70 Pass - Major Risk 12,W5.00 8.875.93 11250.00 8,135." 21822 51.37 3108 3,805.35 4,28128 6.937 1,200.07 31]2] %143 Pass - Major Risk 12,075.00 8.875.93 11,275.00 8,154.69 21822 5152 S.26 3.81300 4,29.01 6937 1,210.35 317% 90261 Pass - Major Rik 12,075.00 8,87593 11,300.00 0,92.86 21822 5167 33.43 302063 4,31187 6.837 121323 31]8] 9048]Pass -Major Risk 12,075.00 8,875.93 11,32500 8,10.98 218M 51.01 34.59 3828.20 4.32].44 6.937 121669 318.17 90780 Pass - Major Risk 12,075.00 0,875.93 11,350.07 82(9.0S 21822 51.% 35.75 3,035.72 4,342.98 6.937 1,220.73 31846 910.%Pass-Major Risk 12,075.00 8,87593 11,37500 sWeS 21822 52.11 See) 3,043.20 4.358.60 6.937 1.225.35 318.]] 91502 Pus - Major Risk 12,07500 8,87593 11,40D.W 8,245.04 21822 52.2] 36.04 3,050.63 4,374.33 6.937 1.230.59 31908 91974 Pass - Major Risk 12,07500 8,87593 11,42500 8,262.93 21822 52.42 01.16 3,857% 4,390.17 6.937 1.23641 31937 925.12 Pus - Major Risk 12,075.00 8.875.0 11,450.00 8,200.78 21622 62.56 4028 3,965.28 4405.09 6.07 1,24238 31964 931.13 Pass -Major Risk 12.075.00 8.87593 11,475.00 8.298.63 21022 52.69 41Y stin 43 4.422.06 607 1,249.62 319.87 937.70 Pass -Maim Risk 12,075.00 8,875.0 11,500.00 8,31642 218.22 52.84 42.47 8079.51 4,438.14 693] 1,257.03 320.15 91403 Pass - Maim Risk 12,07500 8075.93 11,525500 8,331.10 21822 8.% 43.M 3886.51 4.454.36 6937 1,28505 32045 95250 Pass -Mass Risk 12,07500 8,87593 11,55000 8,351.]1 218.22 0,14 0.59 3,893.44 4.4]0.70 0.90] 1,2]362 320.75 %094 Pass -Major Risk 12,075.00 8,8]593 11,57500 8,389.26 210.22 5329 4563 3,90729 4.487.14 8937 1232.71 32101 96987 Pass -Major Risk 12,075.00 9,87593 1160000 83%J8 218.22 53.43 46.65 3,907.03 4,503.84 8937 129227 32129 97933 Pass -Major Risk 12.075.00 8.87593 11.625.00 8.401.27 21822 5357 47M 3,91182 4,520.250 6937 1,30229 321.55 9S926 Pass - Major Risk 12,075.00 8.87593 11.65000 8.421,611 21822 5312 48M 3,920.08 4,576.% 6937 1,312.04 321.82 90171 Pass - Major Risk 12.015.00 8.875.93 11.67500 8,438.9) 21822 5381 4961 3,928.37 4,553.09 6937 1,32891 322.10 1.01065 Pass - Major Risk 12.075.00 8,875.93 11,]00.00 anent 21822 54.02 50.56 3.932.52 4,570% 6.937 1,335.W 32239 1,022.11 Pass - Major Risk 12,081.63 8,874.70 10.450.00 7,537.08 21822 47.12 401 3.86.14 3,8310 6.937 1,423.47 30217 1,162.79 Pass - Major RW 12082.10 8,874.69 10,475.00 ],555.8] 21822 4727 -3.22 3,53591 3,81512 6.937 1,410.01 30260 1,14].4] Pass - Major RW 12,082.13 8,87669 11,050.00 7,980.91 21822 5020 20.59 3,742.55 4.16119 6.937 1,21147 Was 91103 Pass - Major Risk 12,082.8 8874.62 11,025.90 ],9]0.23 21822 5o.% 1937 3,734.41 4141,30 5,937 1,21484 30732 91551 PA.. - Major Risk 12,002.8 8,874.62 10,500.00 ],5]4.64 21822 4740 -242 3,545.63 3.858.57 607 1,3%.% 30243 1,132.53 Pass - Major Risk 12.082.9) 8,874.% 11,000.00 7,95150 21822 4992 18.15 3,726.21 4.18.92 6.07 1.21842 306.69 92065 Paso -Major Risk 12,092.111) ears, 65 10,8500 7,593.45 21822 47.51 -1.58 3,555.2] 3.871.92 6.07 1,334.9 30226 1.11794 Pus - Major Risk 12,083.20 8,874.50 10,97500 7.93232 21822 49,78 1895 3,71794 4,118.63 6.937 1,222.% 306.11 9M.42 Pass - Major Risk 12,08322 0,876% 10,55000 7,61230 21822 478 473 3,56182 3,8%.27 6.07 1,371.68 302.11 1AD367 Pus - Major Risk 12,08349 8,87645 10.951100 7,91391 21822 49% Ism 3,709.58 4.10 .44 6.07 1,22].73 30557 9239 Pus - Major Risk 12,083.50 8,074.45 10,575.00 ],631.1] 21622 47]3 0.15 3.67433 389865 8937 1,359.54 302.03 1,00132 Pus -Maim Risk 12,08375 8,874.41 10,85.00 7,895.08 218.22 4851 14.58 31701.11 409035 6937 1,23323 305.05 939.77 Pass -Maj. Risk 12,%376 8,87441 10,6410.00 ],650.03 210.22 47.86 104 3.561.79 3912.04 5,937 1,347.76 302.02 1,076.12 Pass -Major Risk 12,08316 8,8]43] 10,900.00 7,876.21 210.22 49.38 13.0 3.68.56 4.076.35 6937 123928 30158 847.34 Pass -Major Risk CC - Min centre to Center distance or covergenl point, SF - min separation factor, ES - min ellipse separation &24/2017 3:56.47PM Page 7 COMPASS 5000.1 Build SIB -%'bBP I/.aI pTravelling Cylinder Report BAKER Aho HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00 usft Reference Well: 14-32 Well Error: 0.00 usft Reference Wellbore 14-32A Reference Design: 14-32A WP03 Local Coordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-32 Mean Sea Level 54 32 8/5/1983 00:00 Q 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 - 14-04 - 14-04 - 14-04 What she Error. 0.00 set Survey Program: 8-00DMs RuleAss yneO: Majw Risk OXeat Well Ener. 0.00 us8 Reference grsel Semi Malar Axls assented Vertical Measured Wrecal Reference onset Toofface♦ Onset Wellbore Cent. Casing Contra lP No Go ABewale V/ammg Depth Depth Depth Depth Atunuth eNl$ +PM Hole Biu Cent. Distance Dailies. lean, sesgl (esm (uau) lusft) IuaR) (1) lean) team (in) (oaf) loan) team 12.083.90 0,874.37 10.625.00 7,668.09 218N 47,99 1.98 3,593.22 3,925.47 6937 1]38.36 302.04 1,082.91 Pass -Major Risk 12,084.15 8,87434 10.875.00 7,857.32 21822 4925 12.30 3,683 93 4,062.44 6937 1.245.86 304.16 95847 Pass - Major Risk 12.004.17 8,87033 10,65900 7,687]5 21822 48.12 2.90 3.80282 3,930.94 6.07 1.32538 302.11 1,00.10 Pass -Maior Risk 12,08430 8,674.31 10,850.00 7,8MA2 21022 49.12 11.18 3.675.23 4,048.59 6,107 1.252.95 8381 981.11 Pass Major Risk 12,08433 8,874.31 10,675.00 7,708.59 218.22 40.25 3.86 3,611.95 3,952.45 8837 1.314.77 38.21 1.03172 Pass -Maj. Risk 12,084.43 8.874.29 1885.00 7,819.52 218.22 4901 10.07 3,688.47 4,034.76 6.937 I'M .0 303.0 9323 Pass Major Risk 12.081.45 8,8)4.29 10,70.00 7,725.43 21822 4630 4.84 3,62123 3.968.02 6.937 1,301.0 302.35 1,025.78 Pass - Major Risk 12,061.52 8,874.27 10,8000 7,88.87 21822 4890 699 3,657.61 4,020.93 6.87 1,288.45 3823 982.78 Pass - Major Risk 12,08454 8.87427 10.72500 7,744.24 21822 40.52 584 3,630.47 3,9790 61137 1,291.89 302.54 1,01430 Pass - Major Risk 12,08457 8,87427 10.775.00 7,78185 21822 40.78 T92 3,610.65 409.13 887 1,276.83 WGIII 90.81 Pna-Major Risk 12,004.58 8,876.26 10,70.00 7,)83.04 218.22 460 6.87 3,839.61 3,99337 6.937 1,285.65 30274 1,83.32 Pass -Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 524/2017 356:47PM Page B COMPASS 5000.1 Build 81B BP byTravelling Cylinder Report Company: North America- ALASKA - SP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset TVD Reference: //.r\ BAKM HUGMS Well 14-32 Mean Sea Level 54 : 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design P8 DS 14- 14 -04 -14 -04A -14-04A oeWSMEner. 0.00 AM Survey Program: 32GCT-MS, 16400.MWU Rule Assigned: Major Risk WW Well Error 0.06 usft Reference ghat Semi Major Axis Measured VeNwl Measured Wm.f Assume. Offset Toonace+ (Meet Wellbore Centre Casing- Centre to No Go ABovwEN blaming DePtb DaPM Crash Dons AnmWh +NIS +EI -W Role Size Cane Distal Oriental loan) (usft) (ua14 (omit (uaM tam) 1) (usft) (.an) (in) (ean) (uam sums) 12.061.79 8.8]0.22 11,87500 8,57493 21822 55.11 58.56 3.975.25 4,692.20 6937 142803 337W 1,120.92 Pau - Major Risk 12.062.51 8.970.10 11,85000 8.558.15 21622 54.97 5764 3.969.08 4,674.72 8937 141382 336.66 1,105.99 Pat. -Major Risk 12,063.24 8,877.97 11,02500 8.541.33 21822 54.81 56.70 3,062.93 4,657.28 6937 1,399.58 33561 1,09151 Pass Major Risk 12,063.89 88]7.84 11,80000 8.524.42 21822 Sam 55.74 3,958.81 4,639.91 8.837 1.385.95 334.54 1,071.48 Pass Maim Risk 12,084.76 Ban 71 11,775.00 8.507.44 21822 5449 54.75 3950.72 4,622.60 8937 1.372.72 333.45 1.063.89 Pus Maim Risk 12,065.58 8864.57 11.750.00 8,49040 21822 6433 5375 3.944.55 4,605.34 6.937 1,359.09 33235 1,05014 Pus -Major Risk 12,066.37 B.BAA3 11,]25.00 847332 21822 54.17 52n 3,939.80 4,588.12 6.937 1,347.45 33124 1,030.03 Pus-Mejar Risk 12.07500 8.875.93 11,075.06 8,007.55 21822 50.34 22.78 3.750.80 4176.30 6.937 1.200.94 31520 91075 Pass - Major Risk 12,075.00 8,87593 11,10000 8,025.14 21822 5049 23.97 3,]58.5] 4,191.06 8937 1,208.93 31548 907.37 Pan - Major Risk 12,075.00 8,87593 11,12500 8.044.69 211sn 50.63 25.15 3.766.48 4,205.01 693] 1,205.57 31576 904.64 Pan - Major Risk 12,075.00 8,8]5.93 11.15000 8,063.18 218.22 50.7] 28.34 3,A4.32 4220n 6.937 1.20490 316.06 902.58 Pass - Major Risk 12,075.00 8,875.93 11.175.00 8,01159 21822 ms2 27.52 3,782.13 4,235]2 6.937 1.204.69 31637 901.23 Pass - Mair Risk, CC 13,075.00 8,975.93 11200.00 8.069.93 21822 5108 20.71 3.789.91 4,250.64 6.93] 1,205.24 31688 W0.62 Pass - Maim Risk, ES, SF 12,07500 8,875.93 11,225.00 8,11820 21822 5122 64.64 3]97.55 4,26604 6.937 1,206.37 318.90 900.]0 Pass - Major Risk 12,07500 8,875.93 11,250.00 8,130.d0 21822 5137 3109 3,805.35 4,281.28 6.937 1,200.07 31727 111 Pus - Major Rink 12,7500 8.875.93 11,275.00 8,154.69 21822 5152 32.26 3.81300 4,296.59 6.937 1,210.35 317.58 most Pus - Maim Risk 12.0]5.00 8,875.93 11,300.00 8,1]2.06 21822 5167 33.43 3.820,63 4,31197 6.937 1213.23 31787 80187 Pan - Major Risk 12.075.00 8,87593 11,32500 8,190.98 218.22 5181 3459 3.60120 4,327.44 0.937 1,21889 318.17 90760 Pan -Major Risk 12075.00 8.875.93 11,35000 8,209.05 21822 51.96 35.75 3.835.72 4,342.98 8.937 1,26433 31816 91098 Pan -Major Risk 12,075.00 8,87593 11.37500 8.227.09 21822 52.11 3690 3.84320 4,358.80 6,937 1.225.35 318.77 91502 Paas -Major Risk 12,07500 8,87593 11,40000 8.245.04 21822 52.2] 3804 3,950.63 4,37433 6937 1.230.59 31900 919.74 Pass - Major Risk 12,075.00 0,875.93 11425.00 8.26293 21022 52.42 39.16 3,057.90 4,391 5.937 1.238.41 319.37 925.12 Pass - Major Risk 12,07500 8,875.93 11,450.00 8.280.]8 21822 5258 40.28 31065.64 4.406.09 6,937 1,242.78 31961 931.13 Pass - Maim Risk 12,0]5.00 8.875.93 11,475.00 8,29853 21822 5269 4138 alines 1.42236 6.937 1249.62 31987 93710 Pus - Major Risk 12,07500 8,875.93 11.500.00 8,31642 21822 5284 4247 3879.51 4430.14 6.937 1,257.03 1WAS 94463 Pus - Major Risk 12.07500 8,875.93 11,525.00 8,33110 21822 52.89 43.% 3.886.51 4451.35 6937 1,28505 32045 952.58 Pus - Major Risk 12.075.00 8,87593 11,550.00 0,351,71 21822 53.14 44.59 3.893.44 4,470.70 6937 1,2]3.82 32075 9130.94 Pus Major Risk 12.075.00 8,87593 11,57500 IlUsM 21822 53.29 45.63 3.900.29 4,487.14 8.937 126211 32104 96887 Pan - Major Rift 12.075.00 8,875.93 11,80000 8,386.78 21822 53.43 10.65 3,907.03 4,503.64 6.937 1,292.27 32129 979.33 Pan - Major Risk 12075.00 8875.93 11,82500 8.404.27 218M 53.57 4700 3,91362 4.56424 8.937 1,302.29 32155 93964 Pass - Major Risk 12,075.00 8875.93 11.650.00 8,421.0 21822 53.72 48.85 3,920.08 4,536.99 8.937 1,312.01 321.82 999.71 Pass - Major Risk 12,075.00 8,87593 11,575.00 8,438.99 21822 5387 4961 3,964.37 4,55389 6.937 1,323.91 322.10 1.01065 Pass - Maim Risk 12,07500 8.875.93 11,700.00 8456A9 21822 5402 50.58 3.932.52 4.570.% 6.937 1,335.50 32239 1,022.11 Pass - Major Risk 12,06153 8.8]4.]0 10,450.00 7,53708 21822 47.12 4.01 3.526.14 3,031.93 6.937 1,42347 302.77 1,162.79 Pass -Mejar Risk 12,082.10 8.874.69 10.475.00 7,555.07 2111 4727 .322 3.535.91 301522 6937 1,41004 302.60 1,14747 Pus - Major Risk 12.092.13 8.87459 11,050.03 7,988.91 218.22 50.64 20,158 3.742.55 4,161.79 6937 1,21147 30798 91103 Pue - Major Risk 12.082.52 8,870.62 11,02500 7970.23 21322 50.06 19.37 3.734.41 4,147.30 8.93] 1,21464 30732 91551 Pass - Major Risk 12.082.53 8.874.62 10,50000 7,57481 21822 47.40 -242 3,515.63 3,858.57 6.937 1,396.95 =43 1,13253 Pau - Major Risk 12.002.87 8,874.% 11,00000 7.95150 21822 49.92 18.15 3,726.21 4,13292 6937 1.21042 30689 920.65 Pass - Major Risk 12.082.90 8,874.55 10,525.00 ],593.15 21022 47.51 -1.58 3555.2] 3,871.92 8937 1384.17 302.64 1.117.94 Pas. - Major Risk 12,083.20 8.874.50 10,975.00 ].932.72 210.22 4978 16M 3,71794 4,11883 8937 1.222.80 306.11 92842 Pass - Major Risk 12,083.22 8.074.50 10.550.00 7.612.30 21822 4702 -0.73 3,584.82 3,88527 6.937 1,37188 302.11 1,103.67 Pass - Major Risk 12,08149 0.87445 10.950.00 7,91391 218.22 deals Ming 3,709.58 4,104.44 6937 1.2T7.73 305.57 932.79 Pass - Major Risk 12,08350 8.074.45 10.575.00 7,931.17 218.22 0773 0.15 3,574.33 3,0911 6937 1,359.51 302.03 1,081 Pus - Major Risk 12,08375 8.87441 10,925.00 7,09500 218.22 4951 14.59 3.701.11 4.090.35 6.937 1,233.23 Webs 93971 Pus - Major Risk 12,063.76 8,874.41 10,00000 7,650.03 21822 486 1.04 3,583.79 3,912.04 6.937 1,347713 302.02 1,0713.12 Pue - Major Risk 12,083.86 8,8]4.3] 10,90000 7,876.21 21812 49M 13.44 3.892.56 4,076.35 6.937 1,239.28 304.50 94734 Pue - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 5724/2017 3,56.47PM Page 9 COMPASS 5000.1 Build 81B BP Mks bp Travelling Cylinder Report BAKER HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PS DS 14 Site Error: 0.00 usfl Reference Well: 14-32 Well Error: 0.00 usfl Reference Wellbore 14-32A Reference Design: 14-32A WP03 Local Coordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-32 Mean Sea Level 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 - 14-04 - 14-04A- 14-04A Went MW Error, Survey Program: 32 -GCT -MS, 12kihliV Rule Assigned: Mair Risk OMN WeII EnoD Raterense Oftsd Se" Maim Aule Measured Vernal Measured Versions! Resonance gleet TonMeu♦ Offset Wallbare Centre Casing- centre to Ma Go Allowable Wamin9 bion Lego Death was, AamYIM1 +Ml eEl-W Role Size Cemre Manor. Deviation (.am (..ft) (dam luso) (dste (daft) h) (dam (usn) fn) lusft) (ush) (usftl 12083.90 8,8]4.3] 10.625.00 7,88889 21822 47.99 1.96 3,651 3,92547 6937 1,336.36 302.04 1,082.91 Pass - Major Risk 12,084.15 0,074.34 10,875.00 ],85]32 21822 0925 12.30 3.883.93 4,062.44 6937 1,245.88 304.16 85547 Pau - Major Risk 12,081.1] 0.074.33 10,650.00 7,60].]5 21022 48.12 290 3,802.82 3.938.94 6.937 1,325.38 302.11 1,050.10 Paas - Major Risk 12,064.30 8,874.31 10,94.00 7,038.42 218.22 4912 11.18 3,87523 0,049.59 6937 1252.95 303.81 964.11 Pass - Major Rick 1248433 sand31 10,6]500 1.706.59 218.22 4825 385 3,611.0 3.952.45 8937 1,31477 30221 1,07.72 Pass - Maim Ruk 12,064.43 8,07929 10.@5.4 7,819.52 218.22 48.01 10.0 3,65807 4,034.]8 6937 1.260.50 30.50 973.23 Pacc - Mayor Risk 12,004.45 8,97429 1870040 ],]2503 21932 48M 4.84 3,821.23 3,860.02 807 1,301.60 30235 1,025.78 Pus - Major Risk 12,084.52 8,87627 10.800.00 ],84.6] 21821 48.4 8.99 3,65].61 4,0211.93 8.937 1,268.45 303.23 9112.]8 Penn - Mair Rel, 12.084.51 80]4.27 10,]25.00 7,744.24 21822 40.52 584 3.530.47 3,09,66 6.07 1,291.89 30254 1,01430 Pass -Major Risk 12.051.57 8.074.27 10,715.00 7,781.05 21022 48]8 7.92 3,848.85 440.13 6.937 1,278.83 30290 Mal Pau -Major Risk 12,04.58, 8,874.28 10,74.00 7,783.04 21832 48M 687 3,639.61 3,991.37 6937 1,28585 30.74 1.013 32 Pass - Major Rick 0.4usfi 040 usfl CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 5242017 3:56:47PM Page 10 COMPASS 5000.1 Build 81B JokbBP PB DS 14 - 14-32 - 14-32 - 14-32 p Travelling Cylinder Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 Daft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 Daft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset ND Reference: rias HER UGHES Well 14-32 Mean Sea Level 54 : 32 8/5/1983 00:00 @ 69.00usft (generic dnlling dg) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 - 14-32 - 14-32 - 14-32 Offal site Error. 0 O Dan Survey Program: lWaRG Rule Assigned: NOERRORS OBset gain EPO,. 0.00 out Reference man Semi Major Asia Measured Venial Measured V8r8cal Reference wast Tooffe. Onset We115om Demre Casing- Controls No Go Allowable blaming Depth Depth Depth Depth AvmuM ♦WS +V -W Role So. "in. Durance o lotion lush) (ure) (am) lusnl (ush) Iuc10 1°) (sonl hoom (in) lush) (usft) luso) 10,100.00 8,53142 10,100.00 8534.42 ON 0.00 -6178 2,060.61 3,67545 0000 001 0.05 0.01 Paw -NOERRORS 10,125.00 8,557.12 10.125.00 8.55712 000 0.57 5178 2,063.45 3,885.54 0000 0.01 007 001 Pass-NOERRORS 10,15000 8579.82 10.153.00 8.579.02 0.00 1.14 5178 2,06.37 38%.58 0000 0.01 0.09 001 Pan -NOERRORS 10,175.00 8,602.53 10,175.00 8.602.53 Do 171 5178 ZOOM 3.705.58 0.000 0.01 0.11 001 Pass -NOERRORS 10,20000 8.62525 10,2110% 8,62525 000 2.28 51.79 2,On 48 3,715.56 0000 0.01 0.13 0.01 Pass -NOERRORS 10,22500 8,53797 10,22500 8,647,97 000 205 53.36 2,075.61 3,725.51 0.000 001 0.15 0,01 Pass -NOERRORS 10,249.99 8,670.56 10,250.00 5670.71 0.00 341 -109.01 2.530.60 3,73544 0.000 0.33 0.18 0.33 Pass -NOERRORS 10,274.61 8.691,71 10,275.00 8.6%.48 0.00 3.98 -10854 2.061.70 3,745.35 0000 304 021 304 Pus-NOERRORS 10,297,98 8.709.82 10,300.00 8.716.22 0.00 4.55 -108% 2,084.67 375525 0000 938 025 aW Pus -NOERRORS 10,319.37 8.724.54 1032500 8.738.95 0.01 5.13 -11248 2,087.65 3,76l 0000 10.79 030 10.79 Pass -NOERRORS 10.33552 8,735.96 10,353.% 8,761.63 0.01 572 -11554 2.090.71 3.77528 0000 W78 086 30.70 Pass -NOERRORS 10,35534 0,741.50 10,375.00 8784.24 0.01 830 -11800 2,09385 3,785.47 0.000 44.92 042 44.92 Pan -NOERRORS 10,37000 8,750.75 10,40l 8,806.78 0.01 889 .11997 2,09708 3.79579 0.000 6084 040 60.84 Pass -NOERRORS 10,302.60 8755.18 10,42500 8.829.32 001 746 -121.60 2, 1 GO 29 3,8%.13 0000 78.28 0.53 7628 Pass-NOERRORS 10,393.40 8758.27 10,45000 8,85191 002 got -122.% 2,103.30 3,816.38 0.000 9701 059 9704 Pass -NOERRORS 10,402.65 8,76089 10,47500 8,87058 0.02 0.06 -124.16 2,1%87 3,026.54 0000 118% 084 118,811 Pass- NCERRORS, OO, ES.N 10,410.00 8.761.71 10.50000 0,897.29 002 9.25 -125.13 2,10.25 3,838.81 0000 13753 0.69 13753 Pass-NOERRORS 10,41748 8762.73 10.525.00 8.918% 0.02 9.04 -126.03 2,112.12 3,846.80 0000 150.82 074 15082 Pus-NOERRORS 10423.57 8,783.32 MOON 8.94262 0.02 10.43 -12636 2,115.10 3858.81 0000 180.55 079 10055 Pass -NOERRORS 10,430.00 8,783.70 10,575.00 8965.24 0.02 1103 -12747 2.11819 3.86700 0.000 20265 0.05 202.65 Pus -NOERRORS 10.43361 8,763.81 10,600.00 898781 0.02 11.82 .127.95 2,12138 3,81 0.000 225.04 0.90 225.04 Pass -NOERRORS 10,43500 8783.84 lo.625.W 8019.31 0.03 12.23 -129.42 2,12461 3.00760 0000 247.69 095 247.69 Pan -NOERRORS 10.448.74 8,763.84 10,85000 9,032.84 003 1265 -132.53 2.19.04 3.890.01 0.000 270.42 0.99 27042 Pass -NOERRORS 10,457.39 8.76384 10,675.00 9,055.31 003 1348 -138.16 2,131.05 3.90849 0.000 293.10 101 Mill Pass -NOERRORS 10,46570 8,76384 10.70000 80874 003 14.00 -139.46 2.134.28 3919.115 0.000 31598 108 315%Pass -NOERRORS 10,473.65 8,783.84 10,72500 9.100.16 0.03 14.71 -142.67 2,137.46 3,92985 0.000 33884 112 33861 Pan- NOERRORS 10,481.19 8,7113.84 10,750.00 8122.57 0.04 1533 -14575 2,140.66 394025 0000 Ml 78 1.18 36178 Pass -NOERRORS 10488.33 8763.04 10775.00 9,144.% 0.01 ISM -14830 2,14368 3950.% 0000 384.79 148 384.79 Pass -NOERRORS 10,495.08 8763.84 10000.00 9.16739 004 15.96 -151.52 2,147% 3,95146 0000 40766 3.39 407.80 Pass-NOERRORS 10,501.44 8,763.81 18e25.% 9,189.81 OW 1828 -154.20 2150.26 3, an 07 0.000 43105 542 431.05 Pus -NOERRORS 10,537.42 8,763.81 10,850.00 9,212.22 001 16% -15674 2,153.46 3,902.67 0000 454.29 7.40 454.29 Pus-NOERRORS 10,513.06 8,70.84 10,875.00 %2 63 0% 1891 -159.16 2.158.87 3,%3.27 0000 477.61 9.50 4A.61 Pass -NOERRORS 10,518.35 8,78384 10,900.00 9,25704 0.05 1722 -161.44 2.15907 4,%3.88 0000 50100 1189 50100 Pass -NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 5242017 3:56:47PM Page 11 COMPASS 5000.1 Build 81B I j 1gNMZ BP Ste. r p Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 Daft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset TVD Reference: MAP .■ BAKER HUGHES Well 14-32 Mean Sea Level 54 : 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 14- 14 -33 -14 -33A -14-33A offset ala Error. ow at Survey Program: 100-WY0. 0025. 1145SMVa0 Rule tugged: Mapr Pose, Carter Mil Error, 0.00 on Reference Offset semi Mryor Asls Musomd Verocal Measures Vxecal Reference Onset I."..e OBast Minors crura Casing Centre to No Oo Alloea5le Weming Depth Depth Depth Depth Aymuri +WZ a AAF Hole Size Centre Dianne Deviation pal lusnl (usn) (us") (as) lean) 19 ju m Nef) 9r.) (.an) lust INsI 10,67000 8.763.84 13,20000 8,931.99 218.20 411.55 7234 2,95362 5,22004 3.562 103299 16847 1,280.82 Pau - Major Risk 10.87000 8.MA4 13225.00 8,93240 21820 40.58 72A7 2,952.20 5,195.00 3.582 1,410.07 letter 1,260.42 Pass - Major Risk 10,670.00 0,]03.84 13,250.00 8.932.01 21820 48.81 7257 2.952.42 5,170.09 3.562 1,38775 169.30 1.240.82 Pass -Major Ruk 10,675.51 3763.84 13,2]5.00 0.931.33 218M 10.50 7072 2,954.06 5,145.21 3.582 1.368.41 150.50 1,220.93 Pass -Major Risk 10,68000 8,763.84 13299.92 8.930.24 21020 4908 69.21 2.9588fi 51120.88 3562 1,346.39 154.02 1,202.]9 Pass Major Risk 10680.00 8]6384 13,325.00 8,96.58 21820 4921 69.23 2,98521 5.086.43 3562 1,327.69 15,174 1,186.65 Pass -Major Risk 1088000 8,78381 13.35000 8,92875 21820 49.M 69.23 2,973.75 5.07309 3562 1.310.08 15552 1,17107 Pus - Major Risk 1060000 8.763.84 13.375.00 8,924A2 21820 4947 69.6 2,984.05 5,050.40 3.582 1,295.80 16.38 115487 Pass - Major Risk 10,68581 8.76184 13.400.00 8.822.40 21820 49.60 8725 2,995.51 5,02020 3.562 1,281.99 15060 1,138.00 Pass -Major Risk 10,680.00 8,]8.184 13,42500 8,919.97 21820 4972 8567 3.007.19 5,006.32 3.562 1,28a.72 1611 1.119 fit Pass-Mapr Ruk 10,69000 0,763.84 13,450.00 8,91700 21820 4985 6562 3,01804 saga" 3.562 1.254.94 167.65 1,00763 Pass - Major Risk 10,690.00 8)63.84 13.47500 8.913.75 21020 4998 65.55 3,02].31 4,961.01 3.582 1,24009 168.52 1,0]3.21 Pass - Major Risk 10,69508 8.763.84 13.550.00 8,95097 21820 50.14 63.6!1 303548 4.93789 1562 1,224.53 18294 1,049.76 Pass - Major Risk 10,70000 8,783.04 13,52500 8,905.84 21520 5029 61.0 3,042.43 4,91404 3.562 1.208.31 201.39 1,02546 Pus -Major Risk 10,935.84 8.M.94 13,550.00 8,901.47 21820 5045 7330 3,048.49 4,890.18 3.582 1,180.42 188.57 1,009.38 Pau - Major Risk 10940.49 8.]81.84 13,575.00 8,898.84 21820 50.61 7262 3,055.71 area 72 3.552 1,169.13 19303 9G.08 Paas - Major Risk 10,850.00 8,763.84 13,600.00 seat 91 218.20 50.76 71.31 3.061.55 4,843.84 3.562 1,151.75 17823 97347 Pass -Major Risk 1095000 8,783.114 13,112500 6.886.55 21020 5092 71.15 3,07483 4.821.70 3.562 1,135.45 17705 868.13 Pass -Major Risk 10,950.00 8,703.04 13,650.00 8,88084 21820 51.07 7095 3.085.% 4.79090 3.562 1116.00 177.80 07,88 Pass -Major Risk 10,952.50 8,763.84 13,67500 8.8]4.92 218.20 5122 8823 3.095.79 4.M 83 3.582 1104.08 17143 94240 Pass -Major Risk 10.975.00 8,763.84 13.70000 8.868.81 218.20 51,319 87,49 3,104.62 4,755.28 3582 1.08748 188.5] 9601 Pus - Major Risk 10,975.00 8.763.94 13,725.00 0.862.39 21820 5156 6724 3112.15 4,732.30 3582 1,07001 16936 910.78 Pau - Major Risk 10,975.00 8,7818,4 13,750.00 0.055.10 21820 51.73 seas 3,11363 4,709.27 3.562 1052.19 170.11 892.94 Pau- Major Risk 10,983.43 8,76384 13,775.00 8,1417.06 21802 $191 65.56 3.123.90 4,688.21 3,562 1.033.88 171.03 8]3.08 Pae. - Major Ran 10IN 14 8]63.01 13,500.00 8,839.12 210.6 5209 64.57 3127.92 4,663.22 3562 1,015.18 InA2 85190 Pass - Major Risk 11,000.09 8,76384 13,025.00 8,8639 21320 52.27 62.86 3.130.73 4,640.37 3562 9622 179.44 831.35 Pass -Major Risk 1100009 8,763.84 13,85050 8,818.18 21320 52.45 6213 3132.41 4.61761 3.562 97680 18002 80748 Pas. - Major Risk 11,01381 8,764.02 13,875.00 8.807.90 21820 52.64 62.13 3,133.93 4.594.87 3.582 95751 18074 70724 Pus Major Risk 11.022.42 8,764.33 13,879.00 8.808.6 21820 52.07 6238 3,134.18 4.591.6 3.562 954.45 18093 785.78 Pau- Major Risk, CC, E5,W CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 524/2017 3:56:47PM Page 12 COMPASS 5000.1 Build 61B 1 BP ,,N/� by Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Offset TVD Reference: ON R2 BAKER HUGHES Well 14-32 Mean Sea Level 54 : 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 - 14-33 - 14-33A - Plan 8 Gash sere Error: 0.00 usn Survey Program: 100`GV CT -CMS. 11450 -MWD RsAssigned:Maor Risk Onset Well Ener: 0.00 w8 Reference OBest hemi Malar Anis Measured Vertical Measured VrtScal Reference wast Tuffne♦ Onset Wellbore Centre Casing- Centre to Ne Go Arsenic Wamin9 Depth Death Depth cepto AvmuM aw-8 ♦EbW this Sue Centre Disrexe D.yuti.. into loam hum 1-5x1) IIMn) (usm r) luslq tb.m (in) Nefn (.am (nm 10.67000 8,]63.84 13,115.00 8,957.81 21020 4845 7344 2,962.73 520212 3.562 1.424.10 16938 1,2M 49 Pass - Major Risk 10.67497 0,763.84 13200.00 8,95701 21830 4 611 71.01 2,964]6 5.17720 3.582 1,402]4 159.40 1.208.76 Pass - Major Risk 10.680.00 8763.84 13,225.00 8,957.01 21830 49.71 70.17 2,968.10 5.15243 3.562 1,382.28 15392 1,23805 Pass -Major Risk 1068000 8,763.94 13.250.00 8,95781 21820 48.84 70.29 2.911.73 5,127.07 3.582 1,392.64 154.58 1,221.22 Pass -Major Risk 1000.00 8,783.84 13.275.00 8,95781 21820 4897 70.40 2,97863 5,10350 3.562 1,34402 IM29 1.204.59 Pass Major Risk 10,880.00 8.763.84 13,300.00 8.95181 21820 49.10 7052 2.984.87 5,079.37 3582 1.32503 15602 1,196.90 Pass - Malmo Risk 10,68000 8763.84 13,32500 8.95781 21020 4924 7064 2,989.85 5,054.87 3582 1,307.01 156.71 1,166]8 Pass - Major RIM 10,88531 0.783.84 13,350.00 8,95101 218.20 49.39 8891 2,993.54 5,030.15 3592 1,28148 150.37 1,14524 Pus - Major Risk 10,89000 8,76304 13,375.00 8,957.01 21820 4954 6141 2,995.93 5,00527 3.562 1,27.40 168.51 1.12254 Pus Major Risk 10.670.00 ikmsa 13,400.00 8,95781 21820 4989 67M 2.997.03 4,980.29 3.562 1.246.69 187.14 1,09)43 Pus Major Risk 10,69000 8,78104 13.425.00 8,95781 218M 49.85 67.71 2998.28 4,955.33 3.562 1,2 23 16775 1,071.34 Pau - Major Risk 10,690.00 8,763.84 13.450.00 8,95181 21820 50.01 67.06 3,000.83 4.930.46 3562 1,20811 188.41 1.044.63 Pass - Major Risk 10,690.00 8,783.84 1375.00 8,95791 21020 50.18 60.00 3,004.89 4.905]6 3562 1198.23 169.12 1,017.44 Pass - Major Rink 10,70000 8.763.84 13,500.00 8.957,60 218.20 50.34 84.84 3,009.83 4,W150 3.562 1170.80 201.12 995.25 Pa.. - Major Risk 10,92500 676384 13,525.00 8957.07 218.20 50.51 7260 3.01552 4,956.97 3.562 1,153.31 196.89 974.40 Pass - Major Risk 10,935.15 S76354 13,550.00 8,95503 218.20 50.67 76A5 3.02120 4,83211 3.582 1.133.09 107.55 95543 Pass - Major Risk 10,939.62 8,763.84 13,57500 8,951.68 21820 5084 75.91 3,026.85 (808.59 3.562 1.112.95 181.11 93809 Pon - Major Risk 10850.00 0763.04 13,60000 8.947.05 21020 51.01 7160 3,032.411 4,784,88 3,562 1.092.95 17840 920.01 Pas. - Major RIM 10,950.00 0,763.84 13,82500 8.941.13 21820 51.18 7446 3,037.99 4,78103 3.582 1,073.00 177.08 905.37 Pas. -Major Risk 10.95000 8,763.84 13.65000 8933.96 21820 51.35 74.25 3,043.45 473172 3.562 1,053.32 17711 890.51 Pass Major Risk 10,95809 8.M 84 13.7500 8,925.54 21820 5152 72.98 3,04982 4714.110 3.562 1,033a8 17331 872.39 Pass Major Risk 10.96279 8.763 84 1370.00 8,91590 21820 inu 7203 3054.08 4.892.35 3.562 1,01422 17159 85541 Pus Major Risk 10,975.00 8.70384 13,725.00 8,905.05 21820 5185 70.10 3,05822 4,670.41 35112 99826 161 8%.24 Pass Major Risk 10,975.0 8.78384 13.750.00 889308 21020 5201. 119.51 3,06422 4,649.06 3582 978.05 169.34 02022 Pass Major Risk 10,97500 0,763.84 13,"!7500 8.79.93 21020 52.16 88.89 3,008.7 4,628.35 3.552 960.50 16992 80304 Pas. - Major RIM 10,97500 8,763.84 13,80000 8.88511 218.20 52.31 6815 37316 4.608.34 3.552 things 170.48 784.42 Pass - Major Risk 10,98592 8763.84 13,825.00 8.850.42 218.20 5245 68.40 3.70.27 459908 3.582 927.53 171.80 788,41 Pass - Major Risk 10.990.33 8,76181 13,550.00 8034.13 21820 5259 64.53 3.082.59 4,57062 3,562 91228 113.74 74002 Pass - Major Risk 11,000.09 8,783.84 13.75.00 8.016.85 21820 $272 62.33 3,098]1 4,5537 3562 89803 17951 73156 Pass-MajorRisk 11.000.09 8,763.04 13,883.19 8,81100 21820 5278 61W 30&1.02 4.57.45 3.562 89355 179.66 72542 Pass- Major Risk, CC, ES,W CC - Min centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation 52411017 3.55.47PM Page 13 COMPASS 5000.1 Build 81B I BP byTravelling Cylinder Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Onset TVD Reference: ri.l BAKER HUGHES Well 14-32 Mean Sea Level 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum teferencs Depths are relative to 54 : 32 8/5/1983 00:00 @ 69.00usft (g Coordinates are relative to: 14-32 Jftset Depths are relative to Offset Datum Coordinate System is Alaska NA027 State Plane Zones, NAD27' OGP-Usa AK / :entrai Meridian is 150° o0.000 W Grid Convergence at Surface is: 1.33 ° Ladder Plot -' 1050 C I I I I o I i I I I � I I U I I I I 700- 00 U U c i I I I a) U I I I 350 I I I I I 4000 6000 8000 10000 12000 Measured Depth LEGEND $ 14-04,14-04,14-04V3 $ 1433,14 -33A,14 -33A VO -41- 14-32,14-32,14-32 Vl 14 -04,14 -04A,14 -04A V3 $ 14-03,14-03,14-03 Vt $ 1433,14-33A, Plan 8 VO -XF 14 -03,14 -03A,14 -03A V1 CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 524/2017 3:56:47PM Page 14 COMPASS 5000.1 Build 81B BP FSkv by Travelling Cylinder Report BAKER 04 HUGHES Company: North America -ALASKA- BP Local Coordinate Reference: Well 14-32 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB DS 14 MD Reference: 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: 14-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 14-32A Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: 14-32A WP03 Offset ND Reference: Offset Datum Reference Depths are relative to 54 : 32 6/5/1983 00:00 (ip 69.00usft (g Coordinates are relative to* 14-32 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK / Central Meridian is 150° 0`0o00 W Grid Convergence at Surface is: 1.33 ° Separation Factor Plot 9.00 i G LL 6.00 c i i 0 n____________ 3.00 i 0.00- 0 2500 5000 7500 10000 12500 Measured Depth LEGEND -0- 14-04,14-04,14-04V3 $ 14-33,14J3A,1433A VO ♦- 14-32,14-32,14-32 V1 -)E- 14 -04,14 -04A,14 -04A V3 $ 14-03,14-03,14-03 V7 $ 14-33,1433A,Plan8VO -*- 14-03,14-03A,14-03AV1 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 524/2017 3:56,47PM Page 15 COMPASS 5000.1 Build 81B .. BP Furs by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00 usft Reference Well: 14-32 Well Error: 0.00 usft Reference Wellbore 14-32A Reference Design: 14-32A WP03 Local Coordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 14-32 Mean Sea Level 54 : 32 8/5/1983 00:00 @ 69.00usft (generic drilling dg) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCPt Offset Datum Reference Depths are relative to 54: 32 8/5/1983 00:00 @ 69.00usft (g Coordinates are relative to: 14-32 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK / Central Meridian is 150° 0'0.000 W Grid Convergenceat Surface is: 1.33' Travelling Cylinder -Pfo 95-- 330 \0 17��— /_ _ —_42\ 300 11 12075 8 i' 570�� 0680 285 12250 270 -_— - \--� . 12275— 1 12004 240 180 Azimuth from North [y vs Centre to Centre Separation [950 usft(inj LEGEND 60 -90 120 $ 14-04,14-04,14-04V3 $ 1433,1433A,1433AV0 —4r 14-32,14-32,14-32V1 -(— 1404,1404A,1404A V3 $ 1403,1403,1403 V1 $ 1433,1433A,Plan8V0 —E 14-03,1403A,1403AV1 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 5(242017 3:56r47PM Page 16 COMPASS 5000.1 Build 81B "'W; Pmdhoe Bay 9biw[nc5i06otuxlpx Parent Wellbore: 1432 81W PBD514 Tie an MD: 10100.00 velaa llwjade«xe 6mnsm 6«ei =w,D00x, We1I: 14-32 � sPngr s�r�&u bN ■yam■ wdw.o : 16321 �i wen:1932A WP03 PWs500B MD(1432A432A) ,�„"'—. 5945100- 59.950 59.e00 5944650 59.500 5944350 5944200 5944050 5943900 y—.5943]50 A 5993600 m694300 Y 25943300 5943150 5943000 5942850 5942]00 5942550 5942400 WNW 5942100 5941950 WELLBORE DETAILS: 1432A 9biw[nc5i06otuxlpx Parent Wellbore: 1432 aw4neb(riEl9Wmxo weL laaz,in. xvn Tie an MD: 10100.00 velaa llwjade«xe 6mnsm 6«ei =w,D00x, slim (V9j eeMer n. o OOE1 AYy1e] OepT Beloi«m. & J285119BJ W OOH 6B.Wm6lgspik 0i6 J Iqj L.IeuYhm M6wA.. 6funvnCuneWie riFa9 BAKER HUGHES Feeling (150 uMVin) at Z4 $_ 8_ 8 8 ffi 8 9_.. 8.. ..9 8 S 8 6,8 8 8 8 8 8 8 8 8 8 8 8 ffi 8 8 8 8 8 8 8 8 0 8 1 \ 090 15945100 D]-20NP20A 5 0734I07J I 8951 x5844950 14-32/14-32A WP03 Plus 50011 MD 14 0411404 14-32A WP03 Plus 500ft MD Meeh Bea Level 1603114-03 14-32114-32A WP03 140N1404A [ 5944800 I 1,,,,,r p North America - ALASKA - BP Prudhoe Bay PB DS 14 14-32 14-32A 14-32A WP03 Plus 500ft MD AOGCC Offset Well Report 24 May, 2017 riFag BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-32 Well Error: 0.00usft Reference Wellbore 14-32A Reference Design: 14-32A WP03 Plus 500ft MO BP Anticollision Report BAKER HUGHES Local Co-ordinate Reference: Well 14-32 TVD Reference: Mean Sea Level MD Reference: 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling ng) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM RSK - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Reference 14-32A WP03 Plus 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25+00usft Error Model: ISCWSA Depth Range: 10,100.00 to 12,866,00usft Sun Method: Trev. Cylinder North Results Limited by: Manmum center -center distance of 200,00usft Error Surface: Elliptical Conic Survey Tool Program Date 5/24/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,100.00 SIGMA -Gyro (14-32) SRG Conventional SRG single shots 10,100.00 12,866.00 14-32A WP03 Plus 500ft MD (14-32A) MWD MWD -Standard Summary Site Name Offset Well - Wellbore - Design PS DS 07 PB DS 14 14-03 - 14-03A - 14-03A 14-32 - 14-32 - 14-32 14-32- 14-32A- 14-32A WP03 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 12,058.28 11,775.00 95.54 10,402.65 10,475.00 116.86 12,366.00 12,366.00 0.00 5242017 4: 52: 15PM Page 2 0/ 7 COMPASS 5000.1 Build 91B I BIP bpby Anticollision Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: O.00usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Plus 500ft MD Offset TVD Reference: /.FA9 BAKER HUGHES Well 14-32 Mean Sea Level 54: 32 8/5/1983 00:00 Q 69.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 14 - 14 -03 -14 -03A -14-03A survey Program: 100-KIND,S C"YR"S, 11DBSMM Re@ren. Oeeet Measured V...W M ...d Ver54N OBeetVMlSore Centre C... to Depth Depth Depth Depth w p *EIM Centre (ien) N ft) (eeh) N -M (eek) (.eft) (esh) 11]50.41 8.829.18 12,15000 8,97408 3.356.68 3.603.28 19249 11.773.23 0.927.23 12.12500 8.97400 3,371.94 3,58347 18139 11,795.62 0,92432 12,100.00 8.9M 60 3,307,40 3,58383 17050 11.022.31 8,919.82 12.07500 8.97260 3,40306 3,5".37 15970 11,85139 8,91470 12,05000 897127 3,41530 3.52460 147,51 11,87042 8,91007 12.025.00 8,969.37 3,43307 3.50153 133.99 11,902.30 090591 1290D.00 8988.98 3."743 3,48120 119.56 11,92:1.95 8,902.16 11,97500 8.961.16 3.461.52 3,463,74 10439 11,94324 Base81 11,950.00 3.961Z 3,475.22 3,"3.04 90.31 11,95198 8,896.25 11,925.00 8.953.39 3,48042 3,422.00 77,41 11,9]2.% 8,893.]2 11.900.00 8.956.11 3,501.34 3,400.72 68.38 11,907.95 8.091.05 11,875.00 0,953.92 3,513.89 3,379.21 61.20 12,0!14.0.5 0,888.25 11.850.00 8,951.81 3.525.84 3,357.35 65.0 12,02103 8,085.30 11,825.00 8,949.87 3.53735 3,335.21 72.36 12,039.11 8.802.16 11,800.00 8.94795 3.518.32 3.312.86 82.4 12,056.28 8,878.03 11,]]500 8.915.08 3,550.01 3,290.25 95.M 12,07895 8,875.24 11,75000 0,913.90 3,589.01 3,267.52 109.40 12,101AD 8,871.34 1172500 8,941.63 3,579.03 3,2"]3 12359 12,125.51 8,067.15 11,700.00 0,939.16 3,508.62 3,22118 137,90 12.15125 8,862.0 11,675.00 0.938.72 3,59].51 3,188.55 162.30 12,1M.93 8,858.92 11.650.D0 8,931.38 3,M58 3,175.00 166.04 12,186.76 8,858.52 11.8MM 8,932.08 3,612.87 3,151.20 182.43 12,200.00 8,851.22 11.800.00 8,929.67 3,819.30 3.127.18 199.15 W4/2017 4:52:15PM Page 3 of 7 COMPASS 5000.1 Build 81B I ► BP /* by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: O.00usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WPO3 Plus 500ft MD Offset TVD Reference: FKAild EMIR 111UGHES Well 14-32 Mean Sea Level 54 : 32 8/5/1983 00:00 @ 69.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 OBset Datum Offset Design PB DS 14 - 14-32 - 14-32 - 14-32 a.., Program: 100-SRG Reference Onset Measured Vetlical hreasu.d V.M,.i OasstVhllhere CepRh Gentrete Depth Depth Depth Mien we .v -w rest. Near fuer) fusr) N.") there Jest) wste 10,100.00 8,53142 10.100.00 6531.42 2.08.61 0875.45 001 10.125.00 0,557.12 10,12500 8,557.12 2,MA5 3.665.54 0.01 10,15000 8,579.82 10,15000 8,579.02 2,06897 3.895.50 0.01 1017500 8.602.53 10,17500 8,802.53 2,069.38 3,705.59 001 1020.00 8,625.25 10.00 DO 8,625.25 2,07248 3,715.56 001 10,225.0 8.6,17 97 10.2250 8,647.97 2,07561 3,725.51 0.01 10,249.99 8,670.58 10,20.00 8,67071 2.070.88 3,735.44 033 10,27161 8,691.71 10,275.00 8,89346 2.0170 3)45.15 0N4 10,297.96 8,70982 10,30.0 0,716.22 2,084.67 3,755.25 9.38 10,31837 8.M.54 10,3250 8.730.96 2,087,65 3,78520 18.79 10.338.52 8,735.95 10,3500 8.761.63 2,0071 3.775.28 30.78 10.35534 8,744.50 10,375.00 0704.24 2,09385 3785.0 44.92 10,370.0 8,7075 10,40.00 8,80638 2.097 08 379579 881 10,302.60 8755.18 10,425.00 8,829.32 2,100,28 3,806.13 78.28 10,393.40 8758.27 10,40.00 685191 2,103.30 3,818.36 97,1 10,4112.85 8,78039 10.05.0 8,874.% 2,106.37 3,02851 11088 10,4100 8,751.71 10,W0.00 8,69]28 2.109.25 3,838.61 1370 10.41748 0,762.73 10,525.00 8.919.96 2,112.12 3,848.60 158.02 10,42357 8763.32 10,550.00 8,94262 2,115.10 380.61 18.55 5/24/2017 4:52:15PM Page 4 of 7 COMPASS 5000.1 Build 81B I 1•• BP ..� p Anticollision Report Company: North America- ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: 0.00usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: 0,00usft Output errors are at Reference Wellbore 1432A Database: Reference Design: 14-32A WP03 Plus 500ft MD Offset TVD Reference: FINI H GNES Well 14-32 Mean Sea Level 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling dg) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 14 - 14-32 - 14-32A- 14-32A WP03 Survey Program: I O SRG, 10100~ Reference Offset Measured Wrfi aW Measured V mcal OesetVMM4mC Centre to D.P 0 P81 Death 0.,th cW4 V4V Cents lash) (usft) luafe 1uatD lusft) (uefe lasft) 10,100.00 8,5X42 10.100.00 853x.42 2,M 61 3,675.46 0.00 10,12500 0,557.12 10,12500 8,557.12 2,05064 3,885.5/ 000 10,15040 8.579.83 10,150.00 8.579.82 2,066.37 3.895.59 0.19 10,175.00 8802.53 10,950 8.602.53 2,089.38 3.705.0 0.00 10.=O 00 8,62525 10,20000 8,625.26 2,07948 3,715.57 0.00 10.225.00 8,6297 10.225.00 8,647 97 2,07560 3,M5.51 0.00 1020.00 0,87057 10.250.00 0,670.57 2.078,78 3,735.72 0.00 10,27500 8.692.03 10,2)5.00 8,682.03 2,082.57 3,7292 0.0 10,30.00 8711.31 10,300.00 8,71131 2.087.38 3,76305 0.00 10,32500 B.M0.01 1032500 8720.07 2,093.98 3.7035 008 10,350.00 8,741.95 10350.00 8,741.95 2,102A3 379332 0.00 10,37500 0,752.55 1037500 0752.62 2,112.54 3,819.51 008 10,400.00 8,759.83 10.400.00 0,759.83 2.124.06 3,8x0.45 00 10.425.00 8783.43 10.425.00 8,763.43 2.138.74 3,851.68 000 101450.00 8.76304 10,450.0 8,763.84 2,10.63 3,68264 0.00 10,475.00 8763.84 10,4500 8,763.84 2.1612] 3,901.07 0.00 10,50000 8,76384 10.500.00 8783.84 2,186.54 3,91695 0.00 10,52500 8,763.84 10,52500 0.763.84 2,206.01 3,829.71 008 10550.00 8,763.84 10,550.00 8.70&1 2,231.17 3.939.06 0.00 10,57500 8.70.84 10,57500 8,76304 2,255.49 3,844.78 008 10,00.00 8,76304 10.600.00 8,763.84 2,200.38 3,94673 000 10,625.00 0,783.84 10625.00 8.763.84 2,30529 3,944.07 000 10.850.00 8,763.84 10.80.00 0,763.84 2.328.62 3.939.24 000 10,67500 8763.84 10,675.00 6,763.64 2.352.82 3,98.96 000 1070.00 6783.84 107000 878184 2.374.33 3,9118 000 10,79580 8781,4 10795.0 0.76384 2,393.96 3,90182 0.00 10,75000 8.763.84 10750.00 0,763.84 2,413.0 3,888.69 0.0 10,7750 876384 10,505.00 0,763.84 2,434.52 3,07262 0.00 10,00.00 8.763.84 10,00.00 8,763.84 2,455.89 3.80.65 0.0 10,88.0 8,763.84 108250 8763.80 2,479.91 3.84.82 0.0 10.85000 970.84 10.850.00 8.763.84 2.00.0 3,07.16 000 10.875.0 8,763.84 10.875.0 8,783.04 258.65 3,82169 0.0 10.90000 0,783.04 10.90000 8.763.84 2,54124 3,819.39 00 10,98.0 8,763.84 10,9250 8781.84 2,570.64 3,81062 0.0 10,90.0 8,763.84 10,950.00 8,78384 2.593.56 31800.63 0.00 10,975.00 8763.84 10,9750 8,MA4 2,615.92 3,7OA8 000 11.00.09 87084 11,000.09 8,76384 2,637.74 3,777.09 0.00 11,025.0 0764.45 11,02500 8764.45 2,659.18 3,764.43 0.0 11,050.0 8.766.8 11,00.00 8788.28 2,80.80 3)52.14 000 11,07500 8,769.35 11,07500 8,769.35 2,702.68 3,740.31 00 11,10.00 8,7M.62 11,10000 8.MS2 2,79454 3.M8.96 000 11,12500 8,M,10 11,125.00 8,779.10 2,74639 3,710.13 0.00 11.150.0 0.70]7 11,150.0 8,795.77 2,70,18 3,707.84 00 11.17500 8,79305 11,175.00 8,793.06 2789.64 3,697.33 00 11200.0 8.80.39 11,80.00 9,80.39 2.810.50 3,885.85 00 11225.00 8.80170 11,850 0,0170 2.830.69 3,6MAS 0.00 11.25000 8,51501 11250.00 8,815.01 2.850.15 3,60.97 0.0 11275.00 8,88.32 11,275.00 0,822.32 2,860.84 3,8 ,07 0.0 524/2017 4:52:15PM Page 5 of 7 COMPASS 5000.1 Build 81B I 1N.pL BP 22 .. p SN Antiwllision Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 14 MD Reference: Site Error: O.00usft North Reference: Reference Well: 14-32 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 14-32A Database: Reference Design: 14-32A WP03 Plus 500ft MD Offset TVD Reference: FNA Fag HU NES Well 14-32 Mean Sea Level 54: 32 8/5/1963 00:00 @ 69.00usft (generic drilling dg) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPt Offset Datum Offset Design PB DS 14 - 14-32 - 1432A- 14-32A WP03 Survey pman n: 1 WSBG. 10100.MM Reference Olrm 6leseund WrMral 6wsulea Venial ONsatW MMMCentra Cenee to Depth Depth Depth O mn -NIS -V-W C.M. (van) (usm (Inn) lesm (usm (.aft) luem Know 8,829.83 11,300.00 aan 63 2,88]]6 3,62846 0.00 11,32500 8.836.94 11,325.00 8,836.94 2,90745 3,61590 000 1135000 88"26 11,350.00 8,044.26 2,92785 3,603.45 0.00 1137500 8,651.57 11.375.00 8,851,5] 2,918.91 3.592.13 000 11600.00 8.058.88 11.400.00 3858.88 2.9]055 3,581.97 0.00 11425.00 8,866.19 11.425.00 8,866.19 2.982.71 3,SM.02 0.00 11,450.00 8.973.50 11,450.00 8,87350 3,015.33 3.565.30 000 11,67500 8.88081 11.47500 8,880.81 3.03]99 3,557,68 OW 11,5000D $886.12 11,5(o(r) 8,868.12 3,060.20 3,548.85 000 11,625.00 B.895.43 11,52500 6.095.43 3,061.90 3,538.80 0.00 11,55000 8.902.74 11,550.00 8.902.74 3,103.01 3,527.59 o.00 11,57500 61910.01 1157507 9.91001 3,123.52 3.515.28 0.00 11.60000 8,916A0 11,60000 8,91640 31"23 3,502.84 000 11,62500 8,921.59 11.625.00 8,921.59 3,165.41 3,490.62 000 11,650.00 8.925.58 11,650.W 8,925.58 3.187.01 3,47968 0.00 11,67500 8,923.33 11,67500 0,926.33 3,208.% 3.48703 0.00 11,700.00 8,92955 11,700.00 8,929.88 3,231.19 3,455]2 0.00 11,72500 8,930.14 11,725.00 8.930.14 3,25388 3.4 77 am 11,75000 8,929.20 11,75000 8,92920 3,27631 3,434.23 000 11,775,00 8,927.03 11775,00 8,927.03 3,299.07 3,424.13 0.00 11,80000 81923.64 11.80000 3923.64 3,321.89 3,414.49 000 11,825.07 8,91935 11.82500 5,91935 3,344.83 3.405.54 000 11,850.00 8,915.01 11,a50.00 8,915.01 3,388.19 3,397.78 000 11,87500 8,91066 11,87500 8,91066 3.391.93 3,39128 0.00 11,900.00 8,908.32 11.90000 8,908.32 3.41599 3,308.05 0.00 11,925.00 8.901.96 11,925,00 8.90198 3,440.29 3.382.10 0.00 11,950.00 8.897," 11,95000 8.a97 M 3,4fid.76 3.379.44 0.00 11,97500 ea93.30 11,97500 8.893.30 3,48920 3,378.49 am 12.00000 8,988.95 12.000.00 8,068.95 3,51345 3,37224 0.00 12,025,00 8,884.61 12.02500 8,884.61 3,63]44 3,388]1 0.00 12,05000 8,880.27 12050.00 8,880.27 3.551.10 3,359.92 000 12.075.00 8,87593 12,07500 0,87593 3.584.36 3.351.87 000 12.10000 8,871.58 12.10oW 8,871.58 3,607.17 3,34260 000 12,12500 0.887 24 12,12500 8,80724 3,629.45 3.332.13 000 12,15000 8.052.90 12,150.00 8,852.90 3,651.14 3,320.49 0.00 12,175.00 8,658.56 12,1500 8,868.55 3.6M25 3,30)84 0.00 12,200.00 8.854.22 12,200.00 8,854,22 3,6074 3,295.82 0.00 12,22500 8,849.87 12,22500 8.949.87 3,71583 3,284.96 am 12,25000 0.845.53 12.250.00 8.845.53 3)38.47 3,27529 0.00 12.27500 8,841.19 12,95.00 8,911.19 3,76159 3,266.84 0.00 12,300.00 8,838.85 12.300.00 8,836.85 3,785.13 3,259.63 000 12,325.00 8.83351 12,325.00 8,832.51 3809.02 3.253.68 000 12,350.W 8,828.16 1235000 8,828.16 3,833.19 3,249.01 000 12.38800 8,825.38 12.366.07 8,825.38 3,818.78 3,218]0 000 524/2017 4:52:15PM Page 6 of 7 COMPASS 5000.1 Build 81B ,J` 4400 BP HUI ... p Anticollision Report BAKER HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB OS 14 Site Error: O.00usft Reference Well: 14-32 Well Error: O.00usft Reference Wellbore 14-32A Reference Design: 14-32A WP03 Plus 50Dft MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-32 Mean Sea Level 54: 32 8/5/1983 00:00 @ 69.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 54 : 32 8/5/1983 00:00 @ 69.00usft Coordinates are relative to: 14-32 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK Central Meridian is 150° (Y0.000 W ° Grid Convergence at Surface is: 1.33° 5242017 4:52,15PM Page 7 of 7 COMPASS 5000.1 Build 61B TREE= CNV WELLHEAD= GRAY GENS ACTUATOR= BAKERC OKB. ELEV = 69' REF ELEV = w BF. ELEV = MAY KOP= 3200' Max Angle = 47'@6913' Datum MD= 10392' Datum ND= 8801Y SS 20" GOND, 110' 91.5#, H40, D- 19.124" 13-3/8' CSG, 720, L-80, D =12.347" 248: Minimum ID = 3.920" @ 9507' 7w X 4-1/2" XO OP OF 9-58" X T TEBACK LNR, D = 6.180" — 8477' h SPF 8487' Opn/Sgz 5-1/2- TBG, 17#, 13CR-85 VAM TOP HC, SOZ .0232 bpf, D = 4.892 4 10318- 10348 S 0410184 9.5/8" X 7" LNR HGR w / TEBACK D = 6.84" 8768' 9-5/8" CSG, 47#, L-80 BTC XO TO 50095 9-58" CSG. 47#. SOO-95 BTG D = 8.661' PERFOROkTDN SU1lA WRY REF LOG: BiCS ON 08/25/83 ANGLEATTOPPERP 25" @ 10364' N DW Refer to Production DB for historical pert date SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 318' 4 10318- 10348 S 0410184 06/0487 3318' 4 10353 - 10373 S 09/10/97 07/30/98 3318" 6 10364 -10377 O 08/31/15 RK 3 -VW 4 10367-10377 S 04/01/84 06/04/87 338" 6 1038.5 -10395 O 06/31/15 3 336" 4 10450 - 10460 S 0529/87 06/04/87 338" 4 10470 - 10490 S 03/19189 09/1389 3-38" 4 10470 -10500 S 09/2289 07130/98 33/8" 4 10475 -10505 S 08115/98 08119/15 33(8" 4 10500-10510 S 022&92 0780/98 318' 4 10518-10528 S 05/1387 06/0487 336" 6 10518 - 10550 S 06/2987 09/13/89 SCA5 LNR 12.6#, 13CR-85 VAM TOP, I--1 10500' opf, D = 3.958' '9#, N-60 BT & G .0371 bpf, D = 6.184" 10802' 14-32 SA' 'NOTES: CHROME TBG&LNR GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PDR! DATE 6 3499 3485 18 MArXi DOME RK 16 04/03/17 5 5625 5200 37 bT4G SO RK 20 04/03/17 4 7014 6288 43 MAG DMY RK 0 0620/15 3 7743 6805 46 kM1G DMY RK 0 0820/15 2 8755 750:1 44 P,Rx4G OMY RK 0 0820/15 1 9157 7802 39 AbX' OM1' PJC 0 082x15 5-1/2' HPS 9-56" X 5-1/2' HES TNT PKR D = 4.811" 5-112" FES 9-5/8' X T BKR 2RH PKR w /TIEBACK D = 6.180' 5-1/2" WLEG, D=4.892' 9-58' X 7" BMR FLEX LOCK FGR, D = 6.170' 7" X 4-1/2' XO. D= 3.920' I I'M DYr3 iIT, llmm r DATE REV BY I 00Ma84TS DATE REV BY OOMM3478 09/01183 PKR 176 INITIAL COMPLETION 04/05/17 CJNJM) GLV GO (04/03/17) 0824/18 D-14 WN0 0525/17 JN /JMJ ADD® REF 8 BF ELEV 0826/15 JMD 013G HD CORRBMIONS 0827/15 CK/JM FINAL ODE APPROVAL 09/01/15 DIS(JMO GLV C/O(08x28/15) 0983115 JCWLU ADMRFS(08/31/15) PRUDHOE BAY UNIT WELL: 14-32 PERmrr No: 9831220 AR No: 50-029-20999-00 TION, R14F 40 FSL & 129Z FEL BP Exploration (Alaska) WELLHEAD= GRAY GENS ACTUATOR = 9-5/8' CSG, 47#, L-80 BTC XO TO 50095 9996' 9-5/6' CSG, 47#, 500-95 BTC, D = 8.681' 10089' OKB. B.EV = 69' BF. ELEV = 3-1/2' LNR _#, _ bpf, D = _' KOP= 3200' Max Angle = 10230- Datum MD = _ Datum TVD = 8600' SS PROM -D 14-32A REV 1 110' - 19.124' 113-3/8' CSG, 72#, L-80, D = 12.347' 1 Minimum ID = 2.377" @ 3-3/16" X 2-7/8" XO TOPOF 3-12' X 3-1/4• X 2-7/8' LNR 9477' X 9-5/8' X 7- TRACK LNR D - 6.180• 9477' 5-1/2' TBG, 17#, 13CR-85 VAM TOP HC,9467' .0232 bpf, D = 4.892 5/8' X 7' LNR HGR w / TEBACK, D= 6.84' 1- 9769' MD TVD 9-5/8' CSG, 47#, L-80 BTC XO TO 50095 9996' 9-5/6' CSG, 47#, 500-95 BTC, D = 8.681' 10089' TYPE VLV LATCHI 3-1/2' LNR _#, _ bpf, D = _' DATE 6 4-1/2- PKR WHIPSTOCK (XX/XX/%X) 10230- 12' SCAB LNR 12.6#, 13CR-85 VAM TOP, 152 Dpi, D = 3.958' -10230' DOME R 29#. N-80 BT 8 C, .0371 bpf, D = 6.184- -10230' 04/03/17 E3-1/4' LNR, 6.6#, L-80 TCI 1, .0079 bpf, D = 2-85' - 5200 PERFORATDN SUMMARY FBF LOG: BHCS ON 08/25/83 ANGLEATTOPPEW:_'C ' Note: Refer to Production OB for historical cert data PBTD - SA.` 'NOTES: CHROME TBG 8 LNR 2207' S-1/2HES X NP, D= 4.562• GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCHI PORT DATE 6 3499 3485 18 W3 DOME RK 16 04/03/17 5 5625 5200 37 kM G SO RK 20 D4/03/17 4 7014 6288 43 MMG DWRK 0 08/20/15 3 7743 6805 46M4G DWRK 0 08120115 28755 7503 44 kM G DWRK 0 0820/15 1 9157 7802 39 MMG Ok4Y RK 0 0620/15 1 9266' 1 15-1/2- HB X NP. D = 4.562' 1 5-t2' HES X NP. D=4.56 9477' I- 13.70' DEPLOYMENT SLS 947T 9-5/8' X T BKR 2RH PKR w MEBACK COM43NTS DATE REV BY COMMENTS D = 6.180 8467' 5-1/2' WLCC,, D=4.892' 9497' H9 -5/8"X 7' BKR RIX LOCK KGR ID= 6.170' 9607' 7- X 4-12• XO. D = 3.920' { 301IOV- I�s-1/e-x :1-:1n 6-xo, D=z.76s- ME -LOUT WNDOW (14-32A) 10230'- 3-3116- 0230'-3-3/16' X 2-7/8' XO_ D = 2.377' I PUP JT w/RA TAG I DATE REV BY COM43NTS DATE REV BY COMMENTS 09/01/63 PKR 1761NTIAL COMPLETM 0824115 D-14 RWO CTD SIDETRACK (11442A) 04/12/17 JND BULT PROPOSED 04/18/17 nJMD BULT PROPOSED REV 1 PRUDHOE BAY LW WELL: 14-32A PERMIT No: AR No: 50-029-20999-01 T1OR R14E, 40' FSL 8 1292' BP Exploration (Alaska) Well Blank & TR2-AC BOP Schematic gate Quick Test Sub to Otis Top of 7" Otis 0.0 it .—.—.---.—.—.—........... EL M � CDR2 Rig's Drip Pan Distances from top of riser Excluding quick -test sub Top of Annular 0.0 ft 7-1/16" 51, Flange XT' Otis Box Top Annular Element 0.7 f[ \ I Annular Bottom Annular Cl. Blind/Shears 3.3 ft CL 2-3/8" Combi s 4.1 ft as Deployment Ci. 3" Pipe/Slips 6.6 ft CL 23/8"x3-1/2" VBRs 7.4 ft Bi Kill Line CL Blind/Shears 10.0 k CL 2-3/8" Combi's 10.7 ft CL of Top Swab CL of Bottom Swab CL Flow Tee CL of SSV CL of Master Valve LDS Gound Level 13.3 f[ 14.8 ft 1 s.z n BOP2 17.5 ft } Fusable 19.0 K BOP1 20.5 ft �Swab2 Swab 1 T1 Master 2 Master 1 T2 Choke Line Test Pump Hose TRANSMITTAL LETTER CHECKLIST WELL NAME:y(_ / PTD: -2-17 —CE Z -- Development _Service _Exploratory Stratigraphic Test _ Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_- __) from records, data and logs acquired for well name on pennio. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company—Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sam le intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Com an Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTD#:2170820 Company BP EXPLORATION (ALASKA).INC_ _ _ Initial Class/Type _ _ Well Name: PRUDHOE BAY UI411 1L4 -$2A_ Program DEV Well bore seg ❑ DEV /.PEND GeoArea 890 _ Unit 1.1650 _ On/Off Shore On_ Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05.030(j. 1.A),0,2.A-D) _ _ NA. 1 Permit fee attached_ _ _ - _ NA.. 2 Lease number appropriate_ Yes Entire Well lies within ADL0028312.. 3 Unique well name and number _ _ - Yes - - - - - - - - - - - - 4 Well located in defined pool Yes PRUDHOE BAY, PRUDHOE.OIL POOL - 64015, governed by C0.34F 5 Well located proper distance from drilling unit boundary Yes CO 341 F, Rule 2:. There shall be no restrictions as to well spacing. except that no pay shall be _ 6 Well located proper distance from other wells Yes opened in a well closer than 500 feet to the boundary of the affected area. Planned well conforms to CO 7 Sufficient acreage available in drilling unit Yes 341 F, Rule 2. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has. appropriate bond in force _ Yes Appr Date 11 Permit can be issued without conservation order Yes 12 Permit can be issued without administrative approval Yes SFD 5131/2017 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and. strata authorized by Injection Order # (put. 10# in comments) (For. NA 15 All wells within 1/4 mile area of review identified (For service well only) _ NA 16 Pre -produced injector: duration of pre production less than 3 months (For service well only) NA 18 Conductor stringprovidedNA Conductor set in PBU 14-32 Engineering 19 Surface casing. protects all known USDWs NA Surface casing set in PBU 14-32. 20 CMT vol adequate to circulate on conductor & surf.csg NA Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg NA. 22 CMT will cover all known productive horizons Yes Productive interval will be completed with. cemented liner 23 Casing designs adequate for C, T, B &. permafrost. Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all wasteto approved disposal wells 25 If a reBrill, has a 10-403 for abandonment been approved Yes PTD 183-122, Sundry 317-214.. . 26 Adequate wellbore separation proposed _ Yes Anti -collision analysis complete; major risk failure w/ PBU 14 -03A -deep plug set while drilling 27 If diverfer required, does it meet regulations NA - - - - - - - - 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure is 3347 psig(7.2 ppg EMW ); will drill w/ 8.4-9.5 ppg EMW; MPD Appr Date VTL 5/31/2017 29 BOPEs,. do they meet regulation _ Yes - - - - - - 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 2453 psig; will test BOPS to 3500 psig 31 Choke. manifold complies w/API RP -53 (May 84). Yes - - - - - - 32 Work will occur without operation shutdown Yes - 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No DS 14 wells are H2S-bearing. H2S measures are required. Geology 36 Data presented on potential overpressure zones Yes Planned drilling mud program (about 8.4 - 9.5 ppg). appears adequate to control, operator's forecast 37 Seismic analysis of shallow gas zones. NA pore pressure gradient (about 7.2 ppg). Should higher pore pressures be encountered,.. Appr Date 38 Seabed condition survey (if off -shore) NA BP has immediate access to nearby fluid mixing facilities... _ SFD 5/31/2017 39 Contact name/phone for weekly progress reports [exploratory only] _ NA. Geologic Engineering Date Public Date Commissioner: Date: Commissioner: Com 's J. IW Ikg