Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
194-119
£ & ? $~f~VIC£~, INC RECEIVED December 12, 2000 Mr. Tom Maunder Petroleum Engineer Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Alaska Oil & Gas Cons. Commission Anchorage RE-: Perforation Abandonment Plug: Cross Timbers Well A14-01LN Dear Mr. Maunder, ~} \\ c.~\k.~ ~ ~:\~"~ ~x\q, '~ ~'-~ While setting a planned cement plug intended to abandon open perforations in Cross ~q~///~-^(~ Timbers Oil Company's Well A14-01LN2, mechanical difficulties were experienced that resulted in the cement being placed in a location other than that approved in the Permit to [ Drill. The situation was discussed with you and the P&A of the perforations without additional measures was approved provided we document the events of the cement job and condition of the wellbore. That is the intent oftlfis letter. On December 10, a cement retainer was set in the 5" liner at 9,210' MD, 70' above the top of the perforations to be abandoned (9,280'-10,312'MD). With the retainer stinger stung into the retainer, injection into the perforations was established at 5,725 psi at 1.4 bpm. The stinger was then pulled above the retainer and cement displaced down the drill pipe to within 3 bbls of the stinger. It was then attempted to sting back into the retainer, but the stinger failed to re-engage the retainer and was later found to have broken off. With access to the wellbore below the retainer no longer possible and the drill pipe full of cement slurry, the cement had to be either circulated into the wellbore above the retainer or circulated out of the well and disposed of. Since previous fluids circulated from the wellbore had exhibited oil sheens, it was assumed the cement also would and could therefore not be discharged overboard if it was circulated to the surface. The cement was therefore placed in the wellbore above the retainer. After tripping for a bit and waiting on cement, the top of cement was tagged at 8,380'MD, 830' above the retainer. One foot of cement was drilled to ensure it was not a stringer and the cement was weight-tested with 15,000 lbs with the pumps running. The plug and casing were then pressure tested successfully to 3,000 psi for 30 minutes. While this abandonment plug is not located where originally proposed, its location, length and competency still perform its function of isolating and permanently abandoning the old perforations so that Well A14-01LN can be safely sidetracked and re-drilled as A14- 01LN2 If you have any questions or require additional information, please give me a call at 258- 3446. 715 L Street Anchorage, Alaska 99501 (907) 258-3446 FAX (907) 258-5557 Mr. Tom Maunder 12/12/00 Page 2 Sincerely, FAIRWEA~R E&P SERVICES, INC. Bill Penrose Project Manager cc: Mr. Bill Koger- Cross Timbers Mr. Doug Schultze- Cross Timbers Ms. Susan Suduth - Cross Timbers Cross Timbers Operating Company September 25, 2000 Mr. Blair Wondzell, Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 RE' Application for Sundry Approval - Amended: A14-01LN - Abandon Existing Hemlock Completion (G Pool) Dear Mr. Wondzell' Per your conversations with Bill Penrose and myself, please find attached amended information pertaining to the above Sundry for your review. If you have any questions or require additional information, please contact me at (405) 319-3213 or Bill Penrose at (907) 258-3446. Sincerely, CROSS TIMBERS OPERATING COMPANY Susan I. Sudduth Sr. Engineering Technician Drilling Department Mid-Continent Division enclosures CC: Bill Penose Doug Marshall Mike Langeler Charles Pope 210 Park Avenue, Suite 2350, Oklahoma City, Oklahoma 73102-5605 (405) 232-4011 Fax (405) 232-5538 ' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL *AMENDED 1. Type of Request: [x] Abandon G Pool [ ] Suspend [ ] Plugging [ ] Time Extension [ ] Perforate [ ] Alter Casing [ ] Repair Well [ ] Puli Tubing [ ] Variance [ ] Other [ ] Change Approved Program [ ] Operation Shutdown [ ] Re- Enter Suspended Well [ ] Stimulate 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) IX] Development Cross Timbers Operating Company [ ] Exploratory 116' KB 3. Address [ ] Stratigraphic 7. Unit or Property Name 210 Park Avenue, Ste. 2350, Oklahoma City, OK 73102 [ ] Service Middle Ground Shoal 4. Location of well at surface 8. Well Number PLATF A, LEG 4, COND 26, 1571' FSL & 381' FEL Sec. 11, TSN, R13W, SM A14-01LN At top of productive interval 9. Permit Number @ 9280': 497' FSL & 1047' FWL, Sec. 1, TSN, R13W, SM 94-119 / 94-263 At effective depth 10. APl Number 50-733-20067-61 At total depth 11. Field and Pool ¢__.10,618': 3939' FSL & 1015' FWL, Sec. 1, TSN, R13W, SM MGS G Pool 12. Present well condition summary Total depth: truemeasuredvertical 10,6188,227.4 feetfeet Plugs(measured) Effective depth: measured 9,918 feet Junk (measured) true vertical 8,154 feet Casing Length Size Cemented M D TVD Structural Conductor 370' 24" -- 370' 370' Surface 1,761 10-3/4" 1400 sx 1761' 1662.8 Intermediate Production 10,016' 7" 1150 sx 10,016' 8,164.49 Liner 2,606' $" None 8006' top 6985.86' 10612' btm 8673.81 Perforation depth: Truemeasuredvertical 9'280"10'312' REC~ _L~/VED Tubing (size, grade and measured depth) 2-7/8" 6.5# LB0 EUE 8rd @ 9167' ~O~"-/~(..'O {~ ~0"-00l 4za,!r gas Cons Packers and SSSV (type and measured depth) i~1(~01.~_8.,~ 13. Attachments IX] Description of Sumary Proposal IX] Detailed Operations Program [*] BOP Sketch *On file w/AOGCC 14. Estimated date for commencing operation 15. Status of well classification as: 10/6/00 16. If proposal was verbally approved IX] Oil [ ] Gas [ ] Suspended Name of approver Date Approved Service Contact Engineer Name/Number: Bill Penrose (907)258-3446 Prepared By Name/Number: Susan Sudduth (405)319-3213 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Sig,..~..,~, ,-,.?_..v, . _ _ , Title Susan I. Sudduth, Sr. Engineering Technician DATE: 25-Sep-00 Commission Use Only Conditions of Approval: Notify Commission so representative may witness IApproval No. ,.~OO, 2,:50 Plug integrity ~ BOP Test v Location Clearance__ Mechanical Integrity Test __ Subsequent form required 10- ~ ¢-/"-r ORIGINAL SIGNED L~: D Taylor Seamount Approved by order of the Commission Commissioner Date Form t 0-403 Rev. 06/15/88 Submit In Triplicate MIDDLE GROUND SHOAL WELL N° A14-01LN2 WELL PROGRAM AMENDED The Middle Ground Shoal (MGS) A14-01LN2 will be a re-drill of the existing well A14- 01LN. The objective is the Hemlock reservoir. The current perforations will be isolated using a cement retainer at 9,200' MD and a cement plug from + 9,120' to 10,612' MD. A cement plug will be spotted from 8,250- 8,920'. The well will be directionally drilled out of the existing 7" casing to 11,597' MD (8,729' TVD). Kick off point will be at 7,950' MD (6,939' TVD). The well will be drilled to a depth of 9,920' MD (8,286' TVD) and a 5" liner cemented in place. A 41/8'' hole will be drilled to a depth of 11,597' MD (8,729' TVD) and a 3W' liner cemented in place. The Hemlock will be perforated and produced. Cross Timbers Operating Company MGS A14-01LN2 Sidetrack Procedure AMENDED Move rig over well. Install BPV, N/D tree, N/U BOPE. Test BOPE to 5,000 psi. P/U on tubing, pull packer loose and displace well to 9.0 ppg water-base drilling fluid. POH with tubing, checking for NORM while POH. L/D tubing and completion jewelry and send to shore. P/U 3-1/2" drill pipe, RIH and abandon perforations in the 5" liner as follows (Notify the AOGCC at least 24 hfs in advance): Set a cement retainer at 9,200'MD (80' above the top-most perforation) in the 5" liner and squeeze sufficient cement below it to fill the 5" liner to 10,612'MD (5" liner shoe). Pull out of retainer and place a 80' cement cap on top. Pull up, reverse out and WOC. Weight-test cement plug with 15,000#. POH. Abandon the perforations at 8,401'MD to 8,814'MD by setting a balanced cement plug from 8,250'MD to 8,920'MD. Pull up, reverse out and WOC. Weight-test cement plug with 15,000#. POH. RIH with 7" one-trip whipstock. Orient and set whipstock at 7,950' MD and mill a window in 7" casing using a 6" mill. Directionally drill 6" hole from 7,950' to 9,920'MD. Run and cement 5", 17.95#, L-80 STL liner at 9,920'MD with TOL at approximately 8,000'MD (-300' of lap). Clean out liner to float collar and pressure-test casing/liner lap to 3,000 psi for 30 minutes. Drill out liner shoe and displace well to 14.0 ppg oil-base drilling fluid. Drill approximately 20' of new hole and conduct leak-off test. Directionally drill 4-1/8" hole from 9,920'MD to 11,597'MD. Run and cement 3-1/2", 9.2#, L-80, STL liner at 11,597'MD with TOL at approximately 9,620' (-300' of lap). Displace well to filtered Inlet water. Run 2-3/8", 4.7#, N-80, 8rd EUE completion with gas lift design. Pickle inside of tubing with HC1/xylene and circulate inhibited filtered Inlet water into annulus before setting packer. N/D BOPE, N/U tree. Test tree to 5,000 psi. Release rig. September 18, 2000 Mr. Blair Wondzell Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 RE: Application for Permit to Drill: A14-01LN2 Sidetrack Dear Blair, This is to address the two areas in the subject APD that you requested I clarify. Your first point is that the depth of the kick-off point, intended to be in the 7" casing, appears to actually be in the 5" liner. You are correct and we have corrected the oversight by adjusting the proposed kickoff depth to 7,950'MD, which is above the 5" liner top. Your second concern is that the mud weight required to drill the East Flank of the Hemlock results in a drilling fluid gradient that is uncomfortably close to the formation fracture gradient at the kickoff depth of 7,950'MD (6,939'TVD). I provided the reservoir pressure data and fracture gradient information I had used and we discussed it. You suggested I discuss Middle Ground Shoal fracture pressures with Unocal drilling personnel whom you feel may have calculated the fracture gradient in a more appropriate manner. I did this and also obtained new Hemlock reservoir pressure information. A recent static surface pressure survey was performed on Well A23-01RD, the closest water injector to proposed well A14-01LN2. That survey yielded a Hemlock East Flank reservoir pressure of 5,480 psi at 7,512'. This gives a gradient of 0.73 psi/fl, or 14.0 ppg EMW. Discussions with Unocal drilling personnel indicate the fracture gradient at our proposed kickoff depth in the Tyonek at Middle Ground Shoal lies in the range of 0.75 to 0.80 psi/g, or 14.4 to 15.4 ppg EMW. The fluid gradient difference between that required for drilling the East Flank of the Hemlock and the one existing in the Tyonek at the kickoff depth therefore ranges from 0.4 to 1.0 ppg EMW. This appears to yield a sufficient operating cushion between the mud and fracture gradients at the kickoff point. Two other factors that serve to increase this cushion are that all the water injection in the Hemlock under Platform A is to the north of the proposed well and that the nearest injector, A23-01RD, has been shut in since June in order to allow the reservoir pressure in that area to fall off. Mr. David Johnston 9/19/00 Page 2 Please let me know if this adequately addresses your concerns. If so, I'll formalize the changes in an amendment to the original APD and include a new directional program resulting from changing the kickoff depth. Sincerely, Bill Penrose Sr. Project Manager Cross Timbers Operating Company August 18, 2000 Mr. Blair Wondzell, Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 RE: Application for Sundry Approval' A14-01LN - Abandon Existing Hemlock Completion (G Pool) Dear Mr. Wondzell: Cross Timbers Operating Company hereby applies for approval to abandon the existing Hemlock completion ("G" Pool perfs) in preparation to drill a second sidetrack of the existing A14-01 wellbore. The existing sidetrack sidetrack will be abandoned per AOGCC regulations before the second sidetrack is commenced. Please find attached information as required for your review. Pertinent information attached to this application includes the following: 1) 2) 3) 4) Form 10-403 Application for Sundry Approval; Description of Summary Proposal; and Detailed Operations Program. Diagrams and descriptions of the BOP equipment to be used as required by 20 AAC 25.035 (a)(1) and (b) were previously submitted to your office and are on file. If you have any questions or require additional information, please contact me at (405) 319-3213. Sincerely, CROSS TIMBERS OPERATING COMPANY Susan I. Sudduth Sr. Engineering Technician Drilling Department Mid-Continent Division enclosures CC: Bill Penose Doug Marshall Mike Langeler Charles Pope 210 Park Avenue, Suite 2350, Oklahoma City, Oklahoma 73102-5605 (405) 232-4011 Fax (405) 232-5538 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL Type of Request: [X] Abandon G Pool [ ] Suspend [ ] Alter Casing [ ] Repair Well [ ] Change Approved Program [ ] Operation Shutdown Name of Operator Cross Timbers Operating Company Address 210 Park Avenue, Ste. 2350, Oklahoma City, OK 73102 ] Plugging ] Pull Tubing ] Re- Enter Suspended Well 5. Type of well: [X] Development [ ] Exploratory [ ] Stratigraphic [ ] Service Location of well at surface ,,/' ',/' ,~ PLATF A, LEG 4, COND 26, 1571' FSL & 381' FEL Sec. 11, TSN, Rt3W, SM At top of productive interval @ 9280': 497' FSL & 1047' FWL, Sec. 1, TSN, R13W, SM At effective depth At total depth @10,618': 3939' FSL & 1015' FWL, Sec. 1, TSN, R13W, SM ] Time Extension [ ] Perforate ] Variance [ ] Other ] Stimulate 6. Datum Elevation (DF or KB) 116' KB 7. Unit or Property Name Middle Ground Shoal 8. Well Number A14-01LN 9. Permit Number 10. APl Number 50-733-20067-61 11. Field and Pool MGS G Pool 12. Present well condition summary Total depth: measured 10,618 feet true vertical 8,227.4 feet Effective depth: measured 9,918 feet true vertical 8,154 feet Casing Length Size Structural Conductor 370' 24" Surface 1,761 10-3/4" Intermediate Production 10,016' 7" Liner 2,606' 5" Plugs (measured) Junk (measured) Cemented .. 1400 sx 1150 sx None ORIGINAL MD 370' 1761' 10,016' 8006' top 10612' btm TVD 370' 1662.8 8,164.49 6985.86' 8673.81 Perforation depth: measured True vertical Tubing (size, grade and measured depth) Packers and SSSV (type and measured depth) 9,280'-10,312' 2-7/8" 6.5# LB0 EUE 8rd @ 9167' 13. Attachments [X] Description of Sumary Proposal [X] Detailed Operations Program [*] BOP Sketch *On file w/AOGCC 14. Estimated date for commencing operation I 15. Status of well classification as: 1016/0 0 ] 16. If proposal was verbally approved I [X] Oil [ ] Gas [ ] Suspended Name of approver Date Approved ! Service Contact Engineer Name/Number: Charles Pope (405)232-4011 Prepared By Name/Number: §u'~'&n 'Sudduth (405)31'9-'3213 17. I hereby certify that the foregoing is true and correct to.ihe best of my knowledge Si~( _ .-~"-~ i /~ ! Susan I. Sudduth, Sr. Engineering Technician ¢~ ) 't---.-~\ ~.~.v v,~w,,/~ ,--"~ ~ Commission Use Only DATE: 18-Aug-00 Conditions of Approval: Notify Commission~o representative may witness Plug integrity VF BOP Test ~' Location Clearance Mechanical Integrity Test __ Subsequent form required 10- Approved by order of the Commission Commissioner Form 10-403 Rev. 06/15/88 IApproval No. ~O0-~,~-//- (-o1' ORIGINAL SIGNED BY D Taylor Seamount ApproVed Copy, Betu~ed , ~ MIDDLE GROUND SHOAL WELL N° A14-01LN2 WELL PROGRAM The Middle Ground Shoal (MGS) A14-01LN2 will be a re-drill of the existing well A14- 01LN. The objective is the Hemlock reservoir. The current perforations will be isolated using a cement retainer at 9,200' MD~ cement plug from _+ 9,120' to 10,612' MD. A cement plug will be spotted fro~,250~ 8, 20. . The well will be directionally.,---drilled ou~.2)f the existing 7 casing to 11,597 MD (8,729 Kick off point will be atfk8,300' M~)(7,222' TVD). The well will be drilled to TVD). a depth of 9,920' MD (8,286' -I-VD) and a-'5""llt1~r cemented in place. A 41/8'' hole will be drilled to a depth of 11,597' MD (8,729' TVD) and a 3%" liner cemented in place. The Hemlock will be perforated and produced. Cross Timbers Operating Company MGS AI4-01LN2 Sidetrack Procedure 'Move rig over well. Install BPV, N/D tree, N/U BOPE. Test BOPE to 5,000 psi P/U on tubing, pull packer loose and displace well to 9.0 ppg water-base drilling fluid. POH with tubing, checking for NORM while POH. L/D tubing and completion jewelry and send to shore. P/U 3-1/2" drill pipe, RIH and abandon perforations in the 5" liner as follows (Notify the AOGCC at least 24 hrs in advance): Set a cement retainer at 9,200'MD (80' above the top-most perforation) in the 5" liner and squeeze sufficient cement below it to fill the 5" liner to 10,612'MD (5" liner shoe). Pull out of retainer and place a 80' cement cap on top. Pull up, reverse out and WOC. Weight-test cement plug with 15,000#. POH Abandon the perforatiOns at 8,401'MD to 8,814'MD by setting a balanced cement plug fi'om 8,250'MD to 8,920'MD. Pull up, reverse out and WOC. Weight-test cement plug with 15,000#. POH. PdH with 7" one-trip whipstock. Orient and set whipstock at I~~MD and mill a window in 7" casing using a 6" mill. Directionally drill 6" hole from ,8~ to 9,920'MD. Run and cement 5", 17.95#, L-80 STL liner at 9,920'MD with TOL at approximately .~5'6'MD (-300' of lap). Clean out liner to float collar and pressure-test casing/liner lap to 3,000 psi for 30 minutes. Drill out liner shoe and displace well to 14.0 ppg oil-base drilling fluid. Drill approximately 20' of new hole and conduct leak-off test. Directionally drill 4-1/8" hole from 9,920'MD to 11,597'MD. Run and cement 3-1/2", 9.2#, L-80, STL liner at 11,597'MD with TOL at approximately 9,620' (-300' of lap). Displace well to filtered Inlet water. Run 2-3/8", 4.7#, N-80, 8rd EUE completion with gas lift design. Pickle inside of tubing with HCl/xylene and circulate inhibited filtered Inlet water into annulus before setting packer. N/D BOPE, N/U tree. Test tree to 5,000 psi. Release rig. Cross Timbers Operating Co. MGS A14-01 LN2 Spud: Planned 9/1/2000 (Original wellbore spudded 12/8/67 Sidetrack A14-01 LN was spudded 2/19/95.) Proposed Completion L Surf Csg: 10 3/4" 40.5# J55 BTC @ 1761' Prod Csg: 7", 23~, 26#, 29#, N80. Set @ 10,016'. Cmt'd w/1150 sx G. Proposed: 5" 17.95# L80 STL liner: 8000- 9920'. Cmt'd Proposed Tbg: 2 318" 4.7# N80 8R EUE @ 95S0' WI Bkr DB pkr assembly and GLMs Proposed Cmt plug 8250-8920' GN-GO: 8401'-8429' GR-GS: 8794'-8814' GR-GS: 8820'-8845' (behind pipe) Sidetrack A14-01 LN: Whipstock 9,112'-9,132'. KOP9,129°. 5" 18# N-80 FJ liner 8,006-10,612'. Proposed: 3-"1t2" 9.2# L80 STL liner: 9620- 11597'. Cmt'd Proposed TD 11597' TOC 9848' Orig TD 10038' TD 10618' Proposed Cmt Retainer @ 9200' 80' cmt on top ~nd cmt to 10 632'. HE-HF: 9280'-930~ HI-HK: 9338'-9438' HK-HN: 9460'-9840' H N-HR: 10202'-10312' Cross Timbers Op~.ating Company MGS A14-01 LN Cook Inlet, Alaska Leg 4, Conductor 26 APl No.: Spud: Present Completion 24" Conductor Csg @ 370' Surf Csg: 10 3/4", 40.5 lb, J55, BTC. Set @ 1761'. Cmt'd w/1400 sx. Prod Csg: 7", 23, 26, & 29 lb N80. Set @ 10016'. Cmt w/1150 sx. (23#: 0-1170', 26#: 1170'-9304', 29#: 9304'-10016') 5", 18#, NS0 FJ liner @ 10612' TOL @ 8006' KB' ' Water Depth' ' irs: 6/29/99 Tbg: 2 7/8", 6.5#, L80 EUE 8rd @7956' 2 3/8", 4.7#, L80 EUE 8rd (~ 7956'-9167' (7 - 2 7/8 D-SO G:M's & 2 - 2 3/8" U-SO GLM's) Baker "FV-6" TRSCSSV w/"X" Profile @ 310' GLM MD TVD Port Ptro Psc Pso 1 2022' 1896' 12 935 891 950 2 3665' 3304' 12 915 870 915 3 4970' 4384' 12 900 852 886 4 5990' 5233' 16 950 825 866 5 6634' 5795' 16 930 802 839 6 7210' 6293' 16 915 784 821 7 7785' 6800' 16 900 764 801 8 8399' 7302' 20 975 730 790 9 8980' 7782' 20 Orifice Valve Window @ 9112'-9129' Whipstock @ 9112'-9132' ClBP @ 9132' KOP @ 9129' GN-GO: 8401'-8429' GR-GS: 8794'-8814' GR-GS: 8820'-8845' (behind pipe) 1 Jt. 2 3/8", 4.7#, L80 EUE 8rd tbg GLM #9 @8980' 2 Jts. tbg Otis "X" Nipple @ 9058' (1.875" ID) 1 Jt tbg Baker "FH" Packer @ 9091' w/30K# shear 1 Jt. tbg Otis "XN" Profile Nipple ~ 9134' (1.791" ID) 1Jt. tbg Modified Wireline Re-entry Guide @ 9167' New Perfs in 5" Liner: HE-HF: 9280'-9308' HI-HK: 9338'-9438' HK-HN: 9460'-9840' HN-HR: 10202'-10312' Old Perfs in 7" Csg (cement 9155'-9849') HC-HD: 9105'~9160' HC-HD: 9170'-9236' HE-HF: 9259'-9287' HI-HK: 9331 '-9375' HK-HN: 9400'-9524' HN-HR: 9541 '-9690' HR-HZ: 9711'-9886' TD: 10618' Hard Fill @ 9848' Hard Scale/Fill @ 9897' PBTD: 9918' TD: 10038' TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279--1433 FAX: (907) 276-7542 August 4, 1999 William Miller Cross Timbers Operating Company HC01 Box 485 Old Wik Road Kenai, AK 99611-9704 Dear Mr. Miller, Re: Administrative Abandonment Action Middle Ground Shoal Wells A33-11 Permit # 85-235 A22-14 Permit # 85-068 A14-01 Permit # 674)79 A12-01 Permit # 77-055 A31-11 Permit # 77-031 A13-01 Permit # 66-015 A41-11 Permit # 85-174 This letter reflects the lateral well that replaced the original well by well number, permit number and AP1 number: A12-01LN (permit # 94-120, API# 50-733-10081-62) permit was approved 9/29/94. A13-01LN (permit # 94-105, API# 50-733-10079-61) permit was approved 8/05/94. A14-01LN (permit ~~API # 50-733-20067-61) permit was approved 9/27/94. A22-14LS (permit # 944)71, API# 50-733-10085-62) permit was approved 5/13/94. A31-14LW (permit # 94-044, API# 50-733-20305-62) permit was approved 3/23/93. A33-1 iLS (permit # 93-180, API# 50-733-20383-61) permit was approved 11/30/93. A41-11LN (permit # 94-087, API# 50-733-20378-61) permit was approved 6/28/94. The replacement well incorporates a lateral with the existing well bore. The lateral along with the original hole will be used for production of hydrocarbons. A review of both well files indicates administrative abandonment (SQZED, AOGCC status) of the originating well bore is appropriate according to current AOGCC procedures for wells where additional permitted laterals are drilled from an existing well bore. Production will be reported to the original APl wellbore (-00, -01 or etc) and not to the lateral API wellbore (~60, -61 or etc). 20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled to straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC databases require each conductor have only one permit number and API number. Administrative abandonment of the original permit only eliminates duplication in the databases. Information for the original well and its replacement will be maintained in their respective files until plugged and abandoned according to 20 AAC 25.105. Please notify other cognizant personnel in your organization so that the well will be correctly identified on subsequent reports and applications submitted to the Commission. Chairman Ar'e dry d~'?ch s,s~mp'ies r'equ':ir'ed? yes J~nd r"ecei've¢i"/ ',/e~ \,,?..-:.~:,.. s t h e we 'J i c o r" e d ? y e s (~_~-A~q ,~ 'i y s i' s & d e s c r' 'i' p t 'i: o i'", r" e c e J' ~- ~,, e :~:, r'~ o Ar"e vvei i tests r'equ'ir'ed? W e i i 'i' s -i J"l c: c)i]'1 p '1 i~ ,~:~ n c e ~ i z;! ":"~ Shell Western E&P Inc. ': '~ An affiliate of Shell Oil Company P. O. Box 576 Houston, TX 77001 July 11, 1995 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 SUBJECT: for RECEIVED JUL I 8 1995 A~sk~ 0il & Gas Cons, Commission '. Anchorr.-.' SUBMITTAL OF WELL COMPLETION REPORT (FORM 10-407) MIDDLE GROUND SHOAL A14-01LN REFERENCE: APPROVAL NUMBER 94-'!'19 ! 94-263 Enclosed are duplicate copies of the Well Completion Report (Form 10-407) for Middle Ground Shoal A14-01LN. Ddlling operations were completed 3/10/95, the date of first production was 3/20/95, and the representative well test date was 4/27/95. If you have any questions or wish to discuss, please call Marcus Winder at 713/544-3797 or Jeff Wahleithner at 713/544-3344. Sincerely, :~tG. S. Nady, Manager Asset Administration - Western Asset Continental Division Enclosures WCPAOGCC.DOC- I STATE OF ALASKA .... A,~. ,$KA OIL AND GAS CONSERVATION COk ..... 3S1_O~_/-'"~..% WELL COMPLETION OR RECOMPLETION REPORT~D.__,L. OG S~ll ~s~rn E~ Inc. ~'~.-~¥~ 94-119 / 94-2~ P.0. ~x 576, ~us~, ~ 77001-0576~"~-~ "..~~~q..~~/~] ~- 733-20067-61 P~ A, ~G 4, ~D 26, 1571' FSL & ~1' ~L Sll, T~F--~~~ HI~ ~ND. S~ AtT~~~t~ ; (;;L';'"~qY-~hS~ ..... 10. W~N~ At To~ ~ . / s. ~ms~t(~te~.etc.) Ie. L~~~~~-[~ ~ 'G' ~L 116' ~I ~L ~8~ 1~ ~te 8~ 13. ~te T~. ~ 14. ~te ~., ~p. I I 2-~-95 3-10-95 3-20-95 ~' f~t ~SLI SINGLE 11. TO~(~+~) 18. P~~(~D+~) 19. ~~8~ey I~. ~~eSSSV~t I 21. T~ofPmfrmt 10,618' ~ - - - ~s ~ ~ I ~SV ~ 300' s~tu~J N/A ~ T~ ~~L~ Rm CAS~ ~E ~. ~ ~. ~ .T~~~ ~ ~ ~~ ~ ~ PULLED ~o. ~ o ~o. ... ,o.~,,. ,., ,.~ o ,~,. ,~. ,,o ~x ... ~.~.~,.,o,o,,~. ,.~,,. ,,,o,x ... 5' ~ L-~, N-8 ~06' [06~' 6' 425 SX - - - 24. P~a~.~ to Pr~ (MD + ~ of T~ ~t~ s~e ~ ~) S~E ~TH S~ (~) PACER S~ (MD) 2-7/8' 9~67' 9[02' 92~' ~, 9308~ ~(6 J~F) 9~' - ~' (6 JSPF) ~. A~ F~CT~ ~ ~ETE= ~C. 9~' - 9~' (6 JSPF) ~TH ~V~ (~) ~&~D~ ~m~ U~D --[0,202' - [0,312'~ (6 J~F) 2T. ~~ TEST ~te F~t ~~ ~ ~ of ~a~ (~. ~ ~ etc.) 3- ?o-q~J C~ !.]~ ~te of T~t ~ T~t~ PR~T~ F~ ~-~ ~S-~ WA~R-~ ~ S~E ~ ~S-~ ~T~ 4- 27-95 24 TEST P~ 67 ~[2 [0[ [28~ [672 F~ T~ ~ ~e C~~TED ~-~ ~S-~ WA~R-~ ~ G~-~ (~) Pr~. 90 730 24-~ ~TE ~.7 ~. ~ DATA ~f ~~ of ~. ~. ff~. ~t ~ ~ ~ of ~ ~ ~ wat~. S~ ~e ~i~. ~ RECEIVE~ JUL 1 8 Ab. sk~ 0il & Gas Cons. Commission ..~ Form 10-40T - ' ' Submit tn duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE - 49 - GEOLOGIC .~_.RS ~ . FORMATION TESTS . . / Include intental tested, Ixesst~e clat& all fluids recovered and 9ravity. GOR. MEAS. DEPTH TRUE VERT. DEPTH and time of each phase. SEE ATTACREB GEOLOGIC K4RKER · I- - 31. LIST OF ATTACHMENTS flORNII~ REPORTS, DIRECTIOflAL SURVEY, GEOLoGICN_ I~RKER $~Y 32. . I hereby certify that the f(xegoing is true and correct to the best of my knowledge S~ed , ~J~ /.J~ G.S. NADY. r~e I~R--ASSET Al)tIN. Date 7/11/95 ... .__ IN~TFAJOTION8 General': This form is designed for submitting a complete and correct well completion report and log on . all _types 0flands and leases in Alaska . _ Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt ... water disposal, water supply for injection, observation, injection for in-situ combustion. item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16. and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing. Gas Lift, Rod Pump, Hydraulic Pump. Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Fon~ 10-407 Anadril 1 Schlumberger Client .... Field ..... : MIDDLE GROUND SHOAL Well ...... : A14-01LN Section at: 0.00 Engineer..: R. WALL / G. PAUL Units ..... : FEET JUL I 8 1955 Ahska OiJ & Gas Cons. Commission 07/11/95 · '- Computa tlon'. ...... :' M-I'N~MtlM ' CURYATURE Survey Date,,,: 07/11/95 KB Elevation..: 116,00 ft Reference ..... : JOB~35600/AFE~707130 Magnetic Dcln,: 22,000 E MEAS INCLN DEPTH ANGLE ~lO0 29..7.0 9129 32.00 9161 36,40 9193 41,50 9224 46,30 :'=== _ _~_ DIRECTION AZIMUTH · "RECORD OF SURVEY' (Calculated from a VERTICAL-DEPTHS BKB SUB- SEA tie-in station at 9100 MD) SECTION DISTNCE 3.58 788.2.9 .7766,.9 4090.5. 1.00 7907.8 7791,8 4105,3 1,00 7934.3 7818,3 4123.3 1,00 7959,2 7843.2 4143,4 1,00 7981,5 7865,5 4164.9 RELATIVE-C.OORDINATES FROM-WELL-HEAD ..... Pg: 1 CLOSURE' DISTNCE AZ IMUTH .4.0.90.5. N 1425,7 E 4331.8. 4105,3 N 1426.3 E 4346,1 4123,3 N 1426.6 E 4363.1 4143.4 N 1427.0 E 4382.3 4164,9 N 1427,3 E 4402.7 / oo 19,2.2 <TIE. 19,16 9,53 19,09 13,75 19.00 15,94 18,92 15.48 9271 9301 9333 9357 9389 .. 9419 9444 9501 9531 9547 48,00 0,90 8013.5 7897,5 4199.4 51.20 1.60 8032.9 7916,9 4222.2 55,10 2,30 8052,1 7936,1 4247,8 58,40 2,30 8065,3 7949,3 4267,8 63,7-0 ............. 1.',.60 ..... 8080.,~- 796.4.,.~.. 4~.9.5.,-8'- . 68.00 2.30 8093.0 7977.0 4323.2 71.50. 3..70. 810t~7. 7985.7 4346.,.6 80.20 5.10 8115.6 7999.6 4401.6 81.00 4.~0 8120.5 8004.5 4431.1 81.,.40 3 .... 70. 8122,9 .8006.,9 4446..-9.. 4199,4 N 1427,9 E 4435.5 4222,2 N 1428,4 E 4457,3 4247.8 N 1429.3 E 4481,8 4267.8 N 1430.1 E 4501,1 42.9-5'~8. N.- -t'~31....0.--E ..... ~527.,.9 4323.2 N 1432.0 · 43'46.6 N 1433 u-2 44._0.1.6 .N . 1437...5..E 4431,1 N 1439.9 4446~9 N 1441-.0 ~ 9608 83.50 3.40 8130.9 8014,9 4507,3 4507,3 N 1444,8 E I ...... 9645... 84,70 ...... 3,00 8134.8--. 8018.8 - -4544.0 -4544.0 N -.1446.8 E I 9712 85.90 3,00 8140.2 8024,2 4610.7 4610,7 N 1450.3 E I 9756 86.70 3.70 8143.1 8027,1 465~.5 465.4.5 N 1452.9 E t 9848 86.70 359.50 8148.4 8032,4 4746.3 4746.3 N 1~55.5 E 'Station TypeS: 3/MWD ' 8/TIE-IN ~'~*~rid'and mag-netic.:'.'corre'c'tion:s have' b~en.app~i'ed'to""Chss~..-s.urvsys.~'*~ 4554.2 4576:8 4.630.4 4659.2 4674.6 4733.2 4768.8 4833,4 4876.0 4964,4 18,78 3.62 18,69 10.81 18.60 12.31 18.53 13,75 · . . 't'8-.'42 18,33 14.49 18.25 t4.'95' 18.09 15.45 18'~00 3.52 17~96 4.,.99. 17,77 3.48 17.66''3'.42' 17,46 1.79 17.34 2,41 17,05 4.56 A14-01LN Page 2 07/11/95 ~ RECORD OF S URVEY - ; ~--- -~ Ca- cut-ated -f-rorn----a-- t-ie-Y-ln station- at- 9100 MD)- - --- - - ~ i _ - S MEAS INCLN DIRECTION VERTICAL- DEPTHS SECTION RELATIVE-COORDINATES CLOSURE DL v C DEPTH ANGLE AZIMUTH BKB SUB-SEA DISTNCE FROM-WELL-HEAD DISTNCE AZIMUTH /100. _ 3 ____- 9870 ______ 86.00 ___-_____ 356.70 ___---_ 8149.8 _____-- 8033.8 ___---_ 4768.2 _-_______ __--___ 4768.2 N 1454.7 ~~ E =s~==== 4985.2 _=____~_~ 16.97 __-_ 13.09 ~ 6 3 9917 , 83.90 356.00 8153.9 8037.9 4815.0 4815.0 N 1451.7 E 5029.1 16.78 4.71 3 9944 83.90- -35.6.00 . 8156.8 8040.8 4841,7 4-841-:7 N- 1449.9 E- 5054.2 --16.67 0.00 7 3 10036 84.00 355,30 8166.5 8050.5 4933.0 4933.0 N 1442.9 E 5].39.7 16.30 0.76 c _ _.. . _1_Q13-7- _-.....84.00. . 355....3.0..: '....81'?7. 0.. 8.061 .0 5033 . 1. .......5033 -. 1 N Y434.; 7 E 5.2.33....6... - . :15.91 ~- 0. 00~ ~ X 10618 84.00 355.30 8227.3 8111.3 5509.8 5509.8 N 1395.5 E 5683.8 14.21 0.00 c ~S t~tion Types: 3/MWD X/EXTRAPOLATED ** *Grid and magnetic correct ions have been appl ied to these surveys*** c G U n a G R Z Q U Anadril (c)95 A140]LND B1,52 10:2') AM 2) SWEPI AiJ%SKA DAILY DRILLING REPORT NAME PLATFORM ~D MIDDLE GROUND SHOAL LEASE PLATFORM WELL A14-01LND WORK ORDER 707130 SIDE TRACK DRILLING FORF24AN: SELTZ R H PRESENT ACTIVITY: RIGGING UP AND PROG. DEPTH 10705 ELEVAT. KB TO MSL PRESENT DEPTH DIST. KB TO BHF FOOTAGE DRILLED NLTA LTH/YTD SIZE OF LAST CSG 7.000 LTA LTH/YTD DEP. OF LAST CSG 10016 DAYS SINCE LAST LTA WATER DEPTH 80 'LAST BOP TEST / REPAIR DYNOMATIC 116.0 DAY / 0 EST. DAY ,/0 DAYS +/- 182 LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 ~ KILL SPEED SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 CE/TrER RIG OVER A14-01LN. INSTALLED HAND RAILS AROUND DECK AND MOON POOL. INSTALL STORM CLAMPS ON'SUB BASE. PREPARE DYNAMATIC TO BE REMOVED FOR COUPLING CHANGE. RU AIR TO RIG. WELDER FABRICATING NEW NIPPLE FOR STEAM THRU DECK. RU STEAM LINES. HANG RIG ELECT CABLES TO RIG IN BRACKETS AND CABLE TRAY. CLEANUP DYNAMATIC COUPLING AREA. RD DYNO FOR REPAIRS. INSTALL AUGER. INSTAIJ~ 10" FLOWLINE BEHIND SHAKERS BLIND FLANGE UN'USED END. INSTALL HANDRAILS ON LANDING TO STAIRS TO WHRM'S. SET DRILLING LINE SPOOL FOR RIG FLOOR. RU SLINGS TO HAND DYNO. TURN ON RIG STEAM. PREP RIG UP LOADS FOR EAST CRANE. RU SLINGS FOR WEST CR3UNE TO DYNAMATIC PREP TO REMOVE SAME. REMOVE HICH CLUTCHr SPIDER~ H UB~ AND SHIFTING SLEAVE WITH NATIONAL OILWELL REP. HANGING HEADER MANIFOLDS AND REPAIRING DYNAMATIC AT REPORT TIME. TIME (HRS) CUM. ROT.. HRS ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CA~ING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING 24.00 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM 'A" PROG. DEPTH 10705 D MIDDLE GROUND SHOAL PRESENT DEPTH L~.~SE PLATFORM 'A" FOOTAGE DRILLED WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TP. ACK WATER DEPTH 80 DRILLING FOREMAN: SELTZ R H / PRESENT ACTIVITY: COMPLETE RIG UP PROCEDURES ELEVAT. KB TO MSL 116.0 DATE 02/13/95 DIST. KB TO BHF DAY 4 NLTA LTH/YTI) / 0 EST. DAY 22 LTA LTH/YTD __/ 0 DAYS 4/- DAYS SINCE LAST LTA 183 LAST BOP TEST LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED ~ PP2 ~ KILL SPEED ~ __ SUMMARY OF O~ERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 COMPLETED DYNAMATIC REPAIRS AND REINSTALLED SAME. INSTkLLED BEAVER SLIDE~ CUT AND REMOVE I BEAMS FOR PIPE RACK TO CAT WALK. SET 6" WATER LINE. REPLUMB DRUM CLUTCH AIR AND INSTALL YOKE AND ALIGN SHIFTER. START RIG WATER TO RIG. RU SWEPI SLICKLINE UNIT. RIH WITH 2.7 GAUGE RING. TAGGED SLIGHT TIGHT SPOT AT 7021'. WORKED THROUGH. TAGGED UP ON XN NIPPLE AT 8235'. POH WITH GAUGE. RIH WITH 2.8 GAUGE AND TAGGED UP ON XN NIPPLE. DID NOT TAG TIGHT SPOT. POH WITH GAUGE. RIH WITH 2.75 N TEST SPOOL AND SET IN XN NIPPLE. TESTED CASING TO 2500# FOR FIVE MIN. HELD OK. POH. TOOL BACKED OFF WHILE POH. BOT SECTION IN HOLE. RDSL. INSTALL GUARDS FOR HIGH SPEED CLUTCH AND DYNAMATIC COUPLING. REPAIRED POWER CABLE AND CONDUIT ON DYNAMATIC. SET MUD DOCK IN PLACE. SEAL WELD HYDRAULIC LINES THRU RIG FLOOR. SET CATWALK. CUT HATCH COVER TO FIT RISER. TIIRN ON AND TEST DYNOMATIC - TESTED OK. REPAIRED MISC LEAKS IN HYDRAITLIC LIN1~S. FABRICATE ~ INSTALL 4" CHOKE FLOWLINE. MU X-OVER ADAPTER ON BOTTOM OF RISER. INSTALL HEATER ABOVE DYNAMATIC. MU SHOCK HOSE FOR MUDLINE SIIBBASE. FLANGING UP RU PROCEDURES AT REPORT TIME. NOTE: NOTIFIED AOGCC OF UPCOMING BOP TEST AT 1500 HRS 2/12/95. RECOGNITION TO PRODUCTION FOR ~HE ASSISTANC~ DURING COMPLETION OF TIME (HRS) CUM. ROT. HRS ROTATING' MUD MOTOR TRIPPING C&C REAMING SURVEYS REPAIRS FISHING NIP UP/DOWN /BOP/WH __ TESTING BOP /WH RUI%rNING CASING CF24ENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WF_J%THER/MAT EVAL~IATTON 24.00 SW~ r. JkSKA DAILY DRILLING REPORT PAGE 1 OF 1 NAME PLATFORM "A" ~ MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A14-01LND WORK ORDER 707130 SIDE TP, ACK DRILLING FOR. EFJkN: SELTZ R H PROG. DEPTH 10705 ELEVAT. KB TO MSL PRESENT DEPTH DIST. ]CB TO BHF FOOTAGE DRILLED NLTA LTH/YTD SIZE OF LAST CSG 7.000 LTA LTH/YTD DEP. OF LAST CSG 10016 DAYS SINCE LAST LTA WATER DEPTH 80 LAST BOP TEST / PRESENT ACTIVITY: NIPPLING UP BOP'S 116.0 DATE DAY / 0 EST. DAY / 0 DAYS +/- 184 LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED PP2 ~ KILL SPEED 02/14/95 $ 22 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 PREPARE BOP EQUIPMENT FOR N/U. HANG DOUBLE GATE ON CHAIN HOISTS IN CELLAR. FINISH FAB 6" RET. CHOKE LINE. M/U VALVES ON MUD CROSS. MOVE STAIRS OVER ABOVE WELDING SHOP. CHANGED 6" SCREWS ON AUGER. INSTALL FLOWLINE. HRLD PREJOB SAFETY MEETING WITH PRODUCTION AND RIG CREWS PRIOR TO REMOVING TREE AND N/U BOP'S. CLOSE SSSV. INSTALL BPV. VALVE LEAKING. R/U AND PUMP 85 BBL FIW. pULLED BPV AND CLEANED DEBRIS UNDER VALVE SEAT. INSTALLED BPV. N/D TREE~ SET RISER~ AND N/U BOPS. SET PITCHER NIPPLE WITH FLOWLINE (TAKE MEASUREMENTS). REMOVE AND SET IN WELDING SHOP TO MAKE HEIGHT ADJUSTMENT. NOTE: CORRECT DAILY COST $15,410.00. FALSE DAILY COST OF-$27698.00 ENTERED IN AN ATTEMPT TO CORRECT CUM. COSTS. WILL CONTINXIE TO MONITOR CUM COSTS FOR ERRORS. NOTE: RENTAL CLAMP FROM DSR FOR RISER WILL NOT FIT THROUGH ROTARY TABLE. NEED TO INSTALL EITHER IN SUB-BASE OR WELLREAD ROOM. NOTE: WELL A/TNULUS FLOWING TO PRODUCTION BACKFLOW SYSTEM. DID NOT PUT INTO TEST SEPAR. ATER. ESTIMATE 4 - 8 BBL PER HOUR. CHECKED SEVERAL TIMES FOR H2S - 10 PPM Mg~X. TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING. C & C REAMING SURVEYS REPAIRS FISHING NIP UP/DOWN /BOP/W%{ 12.00 TESTING BOP /WH RU1Nq4ING CASING CEMENTING PICKUP/LAY DOW~ DS INSPECT BNA RIG UP/TEAR DOWN 12.00 WAIT ON WEATHER/MAT EVA~LUATION CORING SWEPI A/Ju~KA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL : : PLATFORM WELL A14-01L/~D WORK ORDER 707130 SIDE TRACK DRILLING FOREMAN: WELLS R V PROG. DEPTH 10705 PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 / PRESENT ACTIVII~f: ATTEMPTING TO UNSET PACKER ELEVAT. KB TO MSL 116.0 DATE 02/15/95 DIST. KB TO BHF 39.8 DAY 6 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 185 LAST BOP TEST 02/14/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PPl ~ KILL SPEED ~ PP2 ~ KILL SPEED ~ SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 COMPLETED BOP INSTA3.J_J~TION. CHANGED OUT PIPE RAMS TO PROPER 3 1/2 RAMS. PERFORMED SUCCESSFULLWEEKLY BOP TEST. CHANGED OUT SWIVEL PACKING AND TESTED SWIVEL. INSTALLED RIG SAFETY AIR TO ESD ON RIG FLOOR. RU POWERTONGS AND ASSOCIATED EQUIPMENT. TESTED WELL FLOW STREAM FOR H2S. MAX CONCENTRATION FOUND WAS 25 PPM DIRECTLY IN WATER FLOW STREAM. HELD PRE-JOB SAFETY MEETING. ATTEMPTING TO UNSET PACKER WITHOUT SUCCESS WITH TENSION PULLS UP TO 200,000#. ATTEMPTING TO UNSET PACKER AT REPORT TIME. TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/W]{ 12.00 TESTING BOP /WI{ 6.00 RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEA~$E PLATFORM ! Al4- 01LNI) Wu .... ORDER 707130 SIDE TRACK DRILLING FOREMAN: WELLS R V PROG. /~'~q'H 10705 PRESEi EPTH 8100 FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 / PRESENT ACTIVITY: POH WITH 3 1/2 PROD. TBG. ELEVAT. KB TO MSL 11r~- DATE 02/16/95 DIST. KB TO BHF 3 DAY 7 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LJ%ST LTA 186 LAST BOP TEST 02/14/95 LAST CSO TEST p2/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED ~ PP2 ~ KILL SPEED % SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 2.50 WORKED PACKER IN AN ATTEMPT TO FREE UP WITHOUT SUCCESS. MONITORED WELL 1.00 FOR VOLUME AND H2S. WORKED RIGHT HAND TORQUE DOWN HOLE IN A ROTATE 3.50 PACKER LOOSE WITHOUT SUCCESS. ATTEMPTED TO RETRIEVE BPV. PLUG FELL OUT OF RETRIEVING TOOL AND DOWN NEXT TO TBG HANGER. RUN IN RISER WITH 6.00 MAGNET AND RETRIEVED BPV. RU SLICKLINE. 3 1/8" INSTALLED MASTER VALVE GATE WOULD NOT OPEN. CHANGED OUT VALVE. RIH WITH 2 3/8" X 10' EXT. TIRE X 2 7/8 FISHING NECK. OPENED SSSV FLAPPER V/tLVE AND LEFT TUBE IN 5.00 HOLE TO HOLD SSSV(321') OPEN. RIH WIT}{ SLICKLINE TO PUSH PREV. LOST TESTING PLUG TO XN NIPPLE. FOUND TEST PLUG HI/NG UP IN X NIPPLE AT 8168'. UNABLE TO WORK DOWN TO XN NIPPLE. PULLED EXT TUBE OUT OF SSSV. 5.00 RU DIA-LOG. RIH WITH 2.75 JET CUTTER WITH EXT TUBE LUBRICATED OVER WL. RIH WITH CUTTER A/TD COLLAR IX)CATOR. CUT TBG AT 8100' (BY WL MEASURE- MENT). MADE CUT IN TBG BODY IN JT ABOVE #7 GAS LIFT MANDREL. POH AND 1.00 RD DIA-LOG. CIRCULATED 120 BBLS FIW DOWN TBG. POH WITH PROD TBG DOWN TO SSSV. DISMANTLED VALVE AND REMOVED. CONT TO POH WITH 3 1/2 PROD TUBING AT REPORT TIME. . TIME (HRS) CUM. ROT. HRS ROTATING MIID MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/W-H TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BNA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 1.00 23.00 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PROG. DEPTH 10705 ' D MIDDLE GROUND SHOAL PRESENT DEPTH 8100 E PLATFORM "A" FOOTAGE DRILLED WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 -DRILLING FOREMAN: WELLS R V / PRESENT ACTIVITY: PREPARE TO ENGAGE FISH ELEVAT. KB TO MSL 116.0 DATE 02/17/95 DIST. KB TO BHF 38.2 DAY 8 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 187 LAST BOP TEST 02/14/95 LAST CSG TEST 02/13/95 B.A INSPECTION (CUM. ROT H~S~ PP2 ~ KILL SPEED ~ SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 6.00 CONT. TO POH LAYING DOWN PROD TBG. 8.00 MA/(E UP TEST JT AND ATTEMPTED TO TEST BLIND RAMS ON BOP. TEST PLUG CONTINUED TO LEAK. ATTEiWPTED TO TEST SEVERAL TIMES BUT COULD NOT GET TEST PLUG TO SEAL OFF. RUN IN LOCKDOWN SCREWS IN AN ATTEMPT TO SF2tL OFF PLUG. PLUG STILL LEAKING. HAD TO WORK LOCK-DOWN SCREW TO GET IT BACKED OUT. FLAGGED BAD PIN/LOCK-DOWN SCREW. PU TBG HANGER WITH 2 WAY BACK PRESSURE %rALVE WITH 1 STAND OF DC'S BELOW HANGER. PERFORMED SUCCESSFUL TEST. RETRIEVED HANGER AND SET WEAR RING. 10.00 RIH WITH OVERSHOT WITH 3.5 GRAPPLE ON DRILL~TRING. RAN TO TOF (8100'). PPD 120 BBLS FIW WITH RE/URNS TO ON DECK TANK. PREPARING TO ENGAGE AT REPORT TIME. NOTE: RECOGNITION TO DOUG YESSAK OF INLET DRILLING FOR HIS "THINKING OUT OF THE BOX" AND DEVELOPING A METHOD OF REPAIR TO THE DIA-LOG WL UNIT ON LOCATION WHICH ALLOWED US TO CONTINUE WITH CUTTING OFF TBG AND AVOIDING COSTLY SHUT DOWN TIME. SAVINGS TO THE AFE +/- $10,000. TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING 10 . 00 C &C _._ REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH 8.00 RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 6.00 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUAT I 0 N CORING DAILY DRILLING REPORT ~-~' PAGE 1 OF 1 RIG NAME PLATFORM "A" D MIDDLE GROUND SHOAL ~ ~E PLATFORM WELL A14-01LNI) WORK ORDER 707130 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: CIRCULATING BOTTOMS UP PROG. DEPTH 10705 PRESENT DEPTH 9155 FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 / ELEVAT. KB TO MSL 116.0 DATE 02/18/95 DIST. KB TO BHF 38.2 DAY 9 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 188 LAST BOP TEST 02/14/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 e KILL SPSED PP2 ~ KILL SPEED SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 7.00 TAGGED UP AND WORKED OVER FISH AT 8088' BY TBG MEASUREMENT. BEGAN JARRING ON FISH AT 200K, WORKED UP TO 235K, AND PULLED FREE AT 270K. POH AND LAID DOWN PACKER AND FISHING TOOL ASSEMBLY. 7.00 RIH WITH }ITC 6" ATJ33 BIT #1 (SERIAL #K19WS). 10.00 TAGGED UP ON CEMENT AT 8619' ' RU EQUIPMENT TO DRILL OUT CEMENT. HELD PRE-JOB SAFETY MEETING. BROKE CIRCULATION AND CIRCULATED BOTTOMS UP. DRILLED OUT SOFT CE~[ENT FROM 8619' TO 8794', HARD CEMENT FROM 8794' TO 9092', AND SOFT CEMENT FROM 9092' TO 9155' CIRCULATING BOTTOMS UP AND MONITORING GAS AT REPORT TIME. TIME (HRS) CUM. ROT. HRS 8.00 ROTATING 8.00 MUD MOTOR TRIPPING 12.00 C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 4.00 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 P'' NAME PLATFORM · ID MIDDLE GROUND sHOAL LEASE PLATFORM WELL Al4 - 01LND WORK ORDER 707130 SIDE TRACK DRILLING FOIAEMAN: WELLS R V PROG. DEPTH 10705 PRESENT DEPTH 9132 FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 / PRESENT ACTIVITY: PREPARING TO RUN WHIPSTOCK ELEVAT. KB TO MSL 116.0 DATE 02/19/95 DIST. KB TO BHF 38.2 DAY 10 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 189 LAST BOP TEST 02/14/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PPl· KILL SPEED ~ PP2 · KILL SPEED ~ SUMMARY OF OPER3KTIONS (SHOW HOURS FOR EACH OPERATION) : 4.00 WELL CIRCULATED CLEAN. CHECK FLOW RATE AT 10 BPH. POH WITH BHA AND LAID DOWN TOP SIX DC'S. 11.00 RIH WITH BIT #1 RR AND CASING SCRAPPER. TAGGED UP ON TD OF 9155'. NO FILL IN WB. CIRC BOTTOMS UP AND PERFORMED 2ND FLOW TEST. RATE OF 6.5 BPH. POH WITH BIT AND LAID DOWN BHA. 8.00 RUWL (SWS). RIH WITH GR/CCL/5.78 GAUGE RING/JB. RAN COLLAR STRIP, POH. HELD PRE-JOB SAFETY MEETING. RIH WIT}{ BAKER 7= CIBP ON WL. SET TOP OF CIBP AT 9132'. POH AND RD SWS. 1.00 CLEAN RIG FLOOR AND PREPARING TO RIH WITH WHIPSTOCK AT.REPORT TIME. NOTE i THE FLOAT THAT WE ARE RUNNING KAS A .25 WEEP HOLE TIIROUGH THE FLAPPER WHICH ASSISTS IN FILLING DRILLPIPE WHILE RUNNING IN THE HOLE THEREBY MINIMIZING AIR POCKETS BEING PUMPED AROUND CASING ANNULUS. TIME (HRS) CUM. ROT. HRS ROTATING' MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN 8.00 16.00 SWE LASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM D MIDDLE GROUND SHOAL L,..~SE PLATFORM WELL Al4 - 01LND WORK ORDER 707130 SIDE TRACK DRILLING FOREMAN: WELLS R V / PRESENT ACTIVITY: MILLING OUT WHIPSTOCK WINDOW ELEVAT. KB TO MSL 116.0 DATE 02/20/95 DIST. KB TO BHF 38.2 DAY 11 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 190 LAST BOP TEST 02/14/95 LAST CSG TEST 02/13/95 PROG. DEPTH 10705 PRESENT DEPTH 9112 FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 · KILL SPEED SUP~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 6.00 FINISHED RIG FIX)OR CLEANUP. M/U WEATHERFORD WHIPSTOCK, 6" STARTER MILL BIT SUB/FLOAT~ I JT 3 1/2 DRILL PIPEr ORIENT SUBf NM HWDR W/MWD~ AND 6 - 4.75 DC'S ON 3.5 DRILL PIPE. ORIENTED WHIPSTOCK AT THE SURFACE. 4.00 3.00 1'.00 3.00 SLOWLY RIH WITH WHIPSTOCK TO 9108'. ORIENT WHIPSTOCK (TOOL FACE 338 DEG). SET WHIPSTOCK. TOP AT 9112'. BOTTOM AT 9132'. MILL DOWN 9112' - 9114' TO-OPEN UP A 6" WINDOW. CIRCULATE BOTTOMS UP AND PERFORMED A FLOW RATE TEST OF 6.2 BPH. CUT AND SLIP 100' OF DRILL LINE. POH WITH STARTER MILL. M/U BHA OF 6 1/8 WINDOW MILL AND 6 1/8 WATERMELON MILL. TIH T/9114'. BROKE CIRCULATION AND BEGAN MILLING OUT WINDOW. MILLED FROM 9114' TO 5.00 TIME (HRS) 2.00 _ 9116' AT REPORT TIME. 11.00 CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C REAMING sURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUAT I ON CORING OTHERS 3.00 12.00 1.00 8.00 SWEPI AJ. Jt~KA DAILY DRILLING REPORT PAGE 1 OF 1 P'' NAME PLATFORM "A" PROG. DEPTH 10705 3 MIDDLE GROUND SHOAL PRESENT DEPTH 9129 LF_2t~E PLATFORM "A" FOOTAGE DRILLED WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 DRILLING FOREMAN: WELLS R V / PRESENT ACTIVITY: PREP T/BUILD 14.0 PPG MUD & WT UP ELEVAT. KB TO MSL 116.0 DATE 02/21/95 DIST. KB TO BHF 38.2 DAY 12 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD __/ 0 DAYS +/- DAYS SINCE LAST LTA 191 LAST BOP TEST 02/20/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED 30 ~ 200 PP2 · KILL SPEED ~ SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 8.50 FINISHED MILLING WINDOW W/MILL ASSMY #2 F/9112' T/9129'. 4.00 BLOW DOWN SURFACE EQUIP~ CHECK FLOW RATE AT 7.1 BPH. POH W/MILLS #2. TEAR DOWN BHA. 4.50 3.50 1.50 .50 1.50 DID WEEKLY BOPE TEST~ OK. MA/rE UP MILLING ASSMY #3~ TIH. (FILL PIPE AT 4280') MILL AND DRESS OFF WINDOW F/9112' T/9124', TAGGE~ BOTTOM AT 9129'. FINISHED CIRC WELL AR~OUND TO MUD UP UNTIL HAD IN/OUT STROKS VOL DONE. OPEN WELL T/ONDECK TANK, DOING ~INAL PIT CLEANING PREPTORY TO WEIGHT UP LTV200 MINERAL OIL MUD TO 14.0 PPG'. WILL USE APPROX 150 BBLS OF THE STORED 9.1 PPG MAPCO 200 OIL MUD FOR USE AS "SOURDOUGH STARTER". TODAYS LOW COST DUE TO CORRECTING ONGOING COST ERROR. TIME (HRS) CUM. ROT. HRS 21.00 ROTATING 10.00 MUD MOTOR TRIPPING 7.50 C & C .5O REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH 4.50 RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT SWEP-~--~-!~kSKA DAILY DRILLING REPORT ..... ~ PAGE 1 OF 1 RT" NAME PLATFORM "A" PROG. DEPTH 10705 3 MIDDLE GROUND SHOkL PRESENT DEPTH 9129 LEASE PLATFORM "A" FOOTAGE DRILLED WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE 02/22/95 DIST. KB TO BHF 38.2 DAY 13 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 192 LAST BOP TEST 02/20/95 LAST CSG TEST 02/13/95 DRILLING FOREMAN: WELLS R V /FREDERICK DA PRESENT ACTIVITY: DISPLACE HOLE WITH 14.0 PPG MUD SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 BUILD VOLUME AND WEIGHT UP OIL BASE MUD TO 14.0 PPG DURING THIS TIME - CREW RIGGED DOWN KATO HOUSE - REMOVED SEIZED ENGINE AND REPLACED WITH ENGINE FROM PLATFORM "C" TODAYS HIGH DAILY COST DUE TO MUD PRODUCTS COST BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED PP2 ~ KILL SPEED 30 ~ 200 TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUAT I ON CORING 21.00 24.00 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A' PROG. DEPTH 10705 D :MIDDLE GROUND SHOAL PRESENT DEPTH 9170 '- ~E PLATFORM "A" FOOTAGE DRILLED 41 WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK -- WATER DEPTH 80 ELEVAT. KB TO MSL .. 116.0 DATE 02/23/95 DIST. KB TO BHF 38.2 DaY 14 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD /--0 DAYS +/- DAYS SINCE LAST LTA 193 LAST BOP TEST 02/20/95 LAST CSG TEST 02/13/95 DRILLING FOREMAN: WELLS R V /FREDERICK DA PRESENT ACTIVITY: MOTOR DRILLING WITH BIT #1 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.00 FINISH WEIGHTING UP MUD TO 14.0 PPG BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED PP2 · KILL SPEED 2.50 HOLD SAFET"f AND PROCEDURE MEETING - DISPLACE 8.5 PPG BRINE WITH 14.0 PPG OIL BASE MUD 5.50 CIRCULATE AND CONDITION MUD - CHECK FOR FLOW - PUMp DRY JOB 3.00 POH WITH 25 STANDS - PICK UP 63 JTS DP 1.00 M/kKE UP TOP DRIVE - CIRCULATE 1-1/2 DP VOLUME - PUMp DRY JOB 2.50 POH WITH MILL ASSY 2.50 LAYDOWN MILL ASSY BRA - MAKE UP MOTOR ASSY BHA WITH BIT #1 - TEST MWD 3.00 RIH - BREAK CIRCULATION ~ 9085' - TAG BOTTOM e 9129' - ORIENT MOTOR 3.00 MOTOR DRILL WITH BlT #1 SPECIAL RECOGNITION TO IDA HANDS~ WILLIE KITCHENS AND STEVE FALK FOR T~EIR SPECIAL EFFORTS IN TAKING THE LEAD ON REPLACING THE MAIN AC ENGINE. ALSO, A SPECIAL T~L%iTKS GOES OUT TO GREG DUGGIN~ DENNIS DUSTIN, PETE MCGRANE AND WAYNE JORDON AND /"HEIR EFFORTS FOR REMOVING THE ENGINE FROM PLATFORM "C". WE WANT TO THANK EVERYONE ELSE THAT ASSISTED IN THIS CHANGEOUTf THE QUICK TURN AROUND SAVED US POSSIBLE DOWN TIME. GOOD JOB! 1600 ~ 30 2400 · 50 __ TIME (HRS) CUM. ROT. HRS 24.00 ROTATING MUD MOTOR 3~00 TRIPPING 8.00 C & C 10.50 REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/W~ TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 2.50 INSPECT BRA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION SW?~-'' ALASKA DAILY DRILLING REPORT .... ". PAGE I OF 1 i RIG NAME PLATFORM "A" .D MIDDLE GROUND SHOAL l.~u~ E PLATFORM "A" WELL Al4 - 01LARD WORK ORDER 707130 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: TIH WITH BIT #3 PROG. DEPTH 10705 PRESENT DEPTH 9312 FOOTAGE DRILLED 142 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 /FREDERICK DA _.- SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 6.00 MOTOR DRILL FROM 9129' TO 9239' 2.50 ROTATE DRILL FROM 9239' TO 9276' ELEVAT. KB TO MSL 116.0 DATE 92/24/95 DIST. KB TO BHF 38.2 DAY 15 NLTA LTH/YTD __/0 EST. DAY 22 LTA LTH/YTD / 0 DAYs +/- DAYS SINCE LAST LTA 194 ,.. LAST BOP TEST 02/20/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED 1600 ~ 30 L, . PP2 ~ KILL SPEED 2400 ~ 50 2.00 ATTEMPT MWD SURVEY - SIGNAL TOO WEAK - CACL2 MAY BE CAUSING SIGNAL LOSS - CIRCULATE OUT - REGAIN SIGNAL OK 6.00 MOTOR DRILL FROM 9276' TO 9312' 2.50 POH TO CASING WINDOW FOR BIT - CHECK FLOW - PUMP DRY JOB 3.00 TOM 1.00 LAY DOWN BIT - MAKE UP BIT ~3 - MOTOR OK SPECIAL RECOGNITION TO BRADLEY ANDERSON (IDA DERRICKMAN) FOR REALIZING THAT THE CACL2 WAS CAUSING THE SIGNAL PROBLEM WITH T~4E MWD AND A SHORT PERIOD OF CIRCULATION WOULD MELT THE CACL2 PELLETS AND IT DID. 1.00 RIH ESTIMATED COST SAVINGS - $17000.00 (PUMP A PILL~ BIT AND TRIP) CORRECTION TO BIT NO. ON YESTERDAYS REPORT - SHOULD HAVE BEEN BIT #2 _ TIME (HRS) CUM. ROT. HRS 38.50 ROTATING . 2 . 50 MUD MOTOR 12.00 TRIPPING 5.00 C & C 1:00 REAMING .50 SURVEYS 2.00 JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 1 . 00 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT __ EVALUAT I ON CORING OTHERS SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PR(X]. DEPTH 10705 .D MIDDLE GROUND SHOAL PRESENT DEPTH 9435 ~..--~E PLATFORM "A" FOOTAGE DRILLED 123 WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE ~ DIST. KB TO BHF 38.2 DAY 16 NLTA LTH/YTD / 0 EST. DAY 2--2 LTA LTH/YTD /O DAYS +/- DAYS SINCE LAST LTA 195 L~T BOP TEb-"r 02/20/95 I~T CSG TEST 02/13/95 DRILLING FOREMAN: WELLS R V /FREDERICK DA PRESENT ACTIVITY: MOTOR DRILLING WITH BIT #3 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : _ 1.00 RIH TO 4927' - FILL PIPE - CHECK MWD - LAY DOWN 2 c'TS BAD DP 2.00 RIH TO TOW % 9127' - FILL PIPE AND CHECK MWD 1.50 CUT AND SLIP 100' DRILL LINE BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED PP2 % KILL SPEED 1.50 RIH - WASH AND REAM FROM 9220' TO 9312' - TIGHT FROM 9292' TO 9312' 11.50 MOTOR DRILL WITH BIT #3 FROM 9312' TO 9397' 1.00 REAM MOTOR RUN - SIIRV~f PP.X~rIOUS STAND 5.50 MOTOR DRILL FROM 9397' TO 9435' - TIGHT SPOT ~ 9414' BIT #2 CONDITION: 6-8-BT-H-E-2-RG-PR 1420 · 30 2160 ~ 50 TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR' TRIPPING C&C REAMING SURVEYS REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT 55.50 17.00 4.50 .50 .50 ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NA/ME PLATFORM "A" PROG. DEPTH 10705 ~ MIDDLE GROUND SHOAL PRESENT DEPTH 9501 ~..~E PLATFORM "A" FOOTAGE DRILLED 66 WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 DRILLING FORF_24AN: WELLS R V - /FREDERICK DA PRESENT ACTIVITY: TIM WITH BIT #5 ELEVAT. KB TO MSL 116.0 DATE 02/26/95 DIST. KB TO BHF 38.2 DAY 17 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD /,. 9 DAYS +/- DAYS SINCE LAST LTA 196 LAST BOP TEST 02/20/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED 1420 % 30 __ PP2 ~ KILL SPEED 2160 % 50 SUMF0kRY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 4.00 CHECK FLOW - POOH TO TOW - CHECK FLOW - PUMP DRY JOB - TOH 1.00 LAYDOWN BIT #3 - CHECK MOTOR AND MWD TOOL - MAKE UP BIT #4 2.00 RIH TO 4900' - FILL PIPE - CHECK MWD 2.00 RIM TO TOW - FILL PIPE - CHECK MWD .50 RIM - WASH AND RY_JkM FROM 9375' TO 9435' 9.00 MOTOR DRILL FROM 9435' TO 9501' - BIT WON'T TAF, E WEIGHT 1.00 ~ MOTOR RUN - ATTEMPT SURVEY ~ 9496' - FAILED TO GET SURVEY 4.00 CHECK FLOW - POOH TO TOW - CHECK FLOW - PUMP DRY JOB - TOH WITH BIT #4 .50 LAY DOWN BHA BIT #3 CONDITION: 5-8-BT-H-E-4-RG-PR BIT #4 CONDITION: 6-8-BT-H-E-I-CT-PR TIME (HRS) CUM. ROT. HRS 65.00 ROTATING MUD MOTOi~ 9.50 . TRIPPING 10 . 50 C & C 1.50 REAMING SURVEYS .50 JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 2.00 INSPECT BHA RIG UP/TmU~ DOW~ WAIT ON WEATHER/MAT EVALUAT I ON CORING OTHERS SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NA~ME PLATFORM "A" D MIDDLE GROUND SHOAL L~.,,~SE PLATFORM "A" WELL A14-01LND WORK ORDER 707130 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: TOH WITH BIT #5 PROG. DEPTH 10705 PRESENT DEPTH 9587 FOOTAGE DRILLED 86 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 /FREDERICK DA SUMF0kRY OF DPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.50 MAKE UP BHA WITH BIT #5 - TEST MWD 2.00 RIH TO 4950' - FILL PIPE - CHECK MWD 2.00 RIH TO TOW - FILL PIPE - CHECK MWD 1.00 REAM FROM 9140' TO 9501' - TIGHT ~ 9290' 15.50 ROTATE DRILL FROM 9501' TO 9587' ..50 SIIRVEY ~ 9570' BIT DEPTH 1.50 POOH WIT}{ BlT #5 ELEVAT. KB TO MSL 116.0 DATE 02/27~95 DIST. KB TO BHF 38.2 DAY 18 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTM/YTD ./O DAYS +/- DAYS SINCE LAST LTA 197 LAST BOP TEST 02120195 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT MRS) PP1 ~ KILL SPEED 830 PP2 ~ KILL SPEED 1720 ~ 50 TIME (HRS) CUM. ROT. HRS 80.50 ROTATING 15.50 MUD MOTOR TRIPPING 5.50 C&C REAMING 1.50 SURVEYS .50 JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICK-dP/LAY DOWN DS 1.00 INSPECT BRA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT SW kLASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PROG. DEPTH 10705 ~ MIDDLE GROUND SHOAL PRESENT DEPTH 9645 L~E PLATFORM "A" FOOTAGE DRILLED 58 WELL A14~01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE 02/28/95 DIST. KB TO BHF 38.2 DAY 19 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 198 LAST BOP TEST 02/20/95 LAST CSG TEST 02/13/95 DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: TIH WITH BIT #7 /FREDERICK DA SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.50 POOH WITH BIT #5 1.00 MAKE UP BHA WITH BIT #6 - TEST MWD .50 SERVICE TOP DRIVE AND DRAWWORKS 2.00 RIH TO 4950' - FILL PIPE - CHECK MWD 2.00 RIH TO TOW - FILL PIPE - CHECK MWD .50 RIH TO 9577' - REAM FROM 9577' TO 9587' 10.00 ROTATE DRILL FROM 9587' TO 9645' .50-~SURVEY - 83.50 DEGREES ~ 9608' - PROJECTED 84.60 DEGREES % BIT 3.00 CHECK FLOW - PUMP DRY JOB - POOH WITH BIT #6 1.00 MAKE UP BHA WITH BIT #7 - CHECK MWD 2.00 RIH TO 4975' - FILL PIPE - CHECK MWD NOTE: RECEIVED PERMISSION FROM LOU GRIMALDI (AOGCC) TO POSTPONE BOP TEST UNTIL HE WOULD BE ABLE TO WITNESS. TENTATIVELY SET FOR OUR NEXT TRIP OUT OF THE HOLE. NOTE: ALL A-I-T MEMBERS - PLEASE BE SURE TO REPORT CONTRACTOR HOURS FOR FEBRUARY BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 ~ KILL SPEED 830 ~ 30 1800 ~ 50 TIME (HRS) CUM. ROT. HRS 90.50 ROTATING 10.00 MUD MOTOR TRIPPING 11.00 C&C ~ING .50 SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH __ TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 2.00 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS .50 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 F 'AME PLATFORM "A" PROG. DEPTH 10705 F~__~3 MIDDLE GROUND SHOAL PRESENT DEPTH 9798 LEASE PLATFORM "A" FOOTAGE DRILLED 153 WELL A14-01LND SIZE OF /2~ST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK __ WATER DEP/q4 80 ELEVAT. KB TO MSL 116.0 DATE 03/01/95 DIST. KB TO BHF 38.2 DAY 20 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 199 LAST BOP TEST 02/20/95 LAST CSG TEST 02/13/95 DRILLING FOREMAN: SELTZ RH /FREDERICK DA PRESENT ACTIVITY: ROTATE DRILLING WITH BIT #7 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.50 RIH TO TOW - FILL PIPE - CHECK MWD 1.00 CUT AND SLIP 100' DRILL LINE .50 RIH TO 9630' - WASH AND ~ FROM 9630' TO 9645' 21.00 ROTATE DRILL FROM 9645' TO 9798' BIT #5 CONDITION: 5-8-BT/RG-H/A-E-4-SD-PR BIT #6 CONDITION: 2-3-WT-H-E-I-CT-BHA BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED PP2 ~ KILL SPEED 830 ~ 30 1720 ~ 50 _ TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING SOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT 111.50 21' O0 2.00 DAILY DRILLING P. EPORT PAGE 1 OF RIG NAME PLATFORM "A" ! MIDDLE GROUND SHOAL Lh.-~E PLATFORM "A" WELL A14-01LND WORK ORDER 707130 SIDE TRACK DRILLING FOREMAN: SELTZ PROG. DEPTH 10705 PRESENT DEPTH 9842 FOOTAGE DRILLED 44 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 /FREDERICK DA PRESENT ACTIVITY: DRILLING WITH MUD MOTOR SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 4.50 ROTARY DRILL 9798' TO 9825' 4.00 CHECK FLOW - PUMP DRY JOB - POOH WITH BIT #7 ELEVAT. KB TO MSL 116.0 DATE 93/02/95 DIST. KB TO BHF 38.2 DAY 21 NLTA LTH/YTD /0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 200 LAST BOP TEST 03/01/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED 1130 ~ 30 PP2 · KILL SPEED 2000 ~ 50 1.50 CUT 3' FROM TOP OF FLOW NIPPLE - (HELD SAFETY MEETING ON RIG FLOOR) 5.50 TEST BOP'S 1.50 MAX~ UP BHA WITH 1.50 DEGREE MUD MOTOR 4.00 RIH - CHECK MWI) AND FILL PIPE ~ 5150' AND % TOW - TAG BOTTOM ~ 9825' .50 ORIENT MOTOR 2.50 DRILL WITH MOTOR - 9-10 FT/HR _ - _ BIT #7 CONDITION: 7-7-BT-A-E-I-LT-BHA TIME (HRS) CUM. ROT. HRS 118.50 ROTATING 4.50 MUD MOTOR 2.50 TRIPPING 8.00 C&C REAMING SURVEYS JET REPAIRS 1.50 FISHING __ NIP UP/DOWN /BOP/WH TESTING BOP /W/{ 5.50 R~rNING C.J~ING CEMENTING PICKUP/LAY DOWN DS 1.50 INSPECT BHA RIG UP/TEA~ DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS .50 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PROG. DEPTH 10705 ) MIDDLE GROUND SHOAL PRESENT DEPTH 9917 L~-mE PLATFORM "A' FOOTAGE DRILLED 75 WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE 03/03/95 DIST. KB TO BHF 38.2 DAY 22 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 201 LAST BOP TEST 03/01/95 LAST CSG TEST 02/13/95 DRILLING FOREMAN: SELTZ P~H PRESENT ACTIVITY: TIH WITH BIT #9 /FREDERICK DA SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 16.50 MOTOR DRILL WITH BIT #8 TO 9917' .50 EVALUATE MWD SURVEY 4.00 CHECK FLOW - PUMP DRY JOB - POOH WITH MOTOR ASSY AND BIT #8 2.00 LAY DOWN MOTOR ASSY BHA AND MAKE UP ROTATING ASSY BHA - TEST MWD 1.00 RIH WITH BIT #9 BIT #8 CONDITION: 5-6-BT-G/M-E-I-ER/SD-HRS BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED PP2 · KILL SPEED 1130 ~ 30 2000 ~ 50 TIME (HRS) CUM. ROT. HRS 135.00 ROTATING MIlD MOTOR 16.50 TRIPPING 5.00 C&C REAMING SURVEYS .50 JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 2.00 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING SWF~'~ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" 3 ~ MIDDLE GROUND SHOAL L~E PLATFORM "A" WELL A14-01LND WORK ORDER 707130 SIDE TRACK PROG. DEPTH 10705 PRESENT DEPTH 10013 -FOOTAGE DRILLED 96 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE 03/04/95 DIST. KB TO BHF 38.2 DAY 23 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 202 L~T BOP TEST 03/01/95 LAST CSG TEST 02/13/95 DRILLING FOREMAN: SELTZ RH PRESENT ACTIVITY: POOH WITH BIT #9 /FREDERICK DA BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 ~ KILL SPEED SUMFJ%RY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 3.00 RIH WITH BIT #9 TO 9825' - FILL PIPE AND CHECK MWD ~ 4690' AND 9060' 1.50 REAM MOTOR RUN FROM 9825' TO 9917' 16.50 ROTATE DRILL WITH BIT #9 FROM 9917' TO 10013' 3.00 CHECK FLOW - POOH TO WINDOW - PUMP DRY JOB - POOH WITH BIT _ _ _ 920 ~ 30 2000 ~ 50 TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/V,rH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS~ INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 151.50 16.50 6.00 1.50 SWEPI A3.J%SKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PROG. DEPTH 10705 D MIDDLE GROUND SHOAL PRESENT DEPTH 10095 Lc.~SE PLATFORM "A" FOOTAGE DRILLED 82 WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 DRILLING FO~: SELTZ RH /FREDERICK DA PRESENT ACTIVITY: RIH. WITH BIT #11 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.00 POOH-WITH BIT #9 ELEVAT. KB TO MSL 116.0 DATE 03/05/95 DIST. KB TO BHF 38.2 DAY 24 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 203 LAST BOP TEST 03/01/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED 940 % 30 PP2 · KILL SPEED 720 ~ 20 1.50 LAY DOWN AND CHECK MWD - LAYDOWN BIT #9 - MAKE UP BIT #10 - TEST MWD 3.00 RIH TO TOW - CHECK MWD AND FILL PIPE ~ 4970' AND 9052' 11 1 00 ~ AND SLIP 100' DRILL LINE 50 SERVICE TOP DRIVE 50 RIH TO 9915' - MAKE UP TOP DRIVE 50 WASH A_ND REAM FROM 9915' TO 10013' 00 ROTATE DRILL FROM 10013' TO 10087' O0 CHECK FLOW - PUMP DRY JOB O0 POOH WITH BIT #10 1.00 LAY DOWN A/gD CHECK MWD - LAYDOWN BIT #10 - MAJfE UP BIT #11 - TEST MWD BIT #9 CONDITION: 8-8-RG-A-F-3-SD-TQ BIT #10 CONDITION: 5-8-RG-A-E-3-SD-TQ TIME (HFS) CUM. ROT. HRS 162.50 ROTATING 11.00 MUD MOTOR TRIPPING 8.50 C&C REAMING .50 SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 2.50 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION -' S~ ALASKA DAILY DRII. J~ING REPORT PAGE 1 OF 1 P'- NAME PLATFORM ~ ) MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL Al4 - 01Li~D WORK ORDER 707130 SIDE TRACK DRILLING FOREMAN: SELTZ PROC. DEPTH 10705 PRESENT DEPTH 10210 FOOTAGE DRILLED 115 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 /FREDERICK DA PRESENT ACTIVITY: TRIPPING FOR BIT SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : .50 BF~A - M/U BIT #11 - TEST MWD 3.00 TIH - FILL PIPE · 4970' & 9070' (TEST MWD) .50 M/U TOP DRIVE - WASH & REAM TO BOTTOM 19.00 1.00 ROTARY DRILL FROM 10r095' TO 10210' PUMP DRY JOB & TOOH FOR BIT ELEVAT. KB TO MSL 116.0 DATE 03/06/95 DIST. ~B TO BHF 38.2 DaY 25 __ NLTA L/7{/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 204 LAST BOP TEST 03/01/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED 1020 ~ 30 PP2 ~ KILL SPEED 730 ~ 20 NOTE; PENETRATION RATE DECREASED FROM 7-9 F'r/HR TO 5 FT/HR TO 2 FT/ HR. NO TORQUE. DECREASE IN P-RATE MAY BE DUE TO SILTSTONE AT TOP OF HR? WILL TRIP FOR BIT & SEE?? TIME (HRS) CUM. ROT. HRS 181.50 ROTATING · 19.00 MUD MOTOR TRIPPING 4.00 C&C REAMING .5O SURVEYS REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICK-dP/LAY DOWN DS .50 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS SWEPI ALJ~gKA DAILY DRILLING REPORT PAGE 1 OF 1 I 'AME PLATFORM "A" PROC. DEPTH 10705 Fi~D MIDDLE GROUND SHOAL PRESENT DEPTH 10296 LEASE PLATFORM "A' FOOTAGE DRILLED 86 WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE 03/07/95 DIST. KB TO BHF 38.2 DAY 26 NLTA LTH/YTD __/_ 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 205 .. LAST BOP TEST 03/01/95 LAST CSG TEST .02/13/95 DRILLING FOREMAN: SELTZ RH PRESENT ACTIVITY: DRILLING _ /FREDERICK DA SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 2.50 TOOH FOR BIT #11 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 ~ KILL SPEED 1.50 BHA - CHANGE OUT NB ST;%B. - STD BACK MONELS - P/U (1) STEEL DC - M/U BIT #12 3.50 TIH - FILL PIPE ~ 4900' .50, SERVICE RIG & TOP DRIVE ~ SHOE - FILL PIPE 1.50 REAM THROUGH COAL ~ 9853' - REAM TO BOTTOM FROM 10,132' 14.50 ROTARY DRILL FROM 10,210' TO 10,296' BIT #11 IADC DULL GRADE - 7-7-BT-A-Fr#1-I-CT-PR 780 ~ 30 580 ~ 20 TIME (HRS) CUM. ROT. HRS 196.00 ROTATING 14.50 MUD MOTOR TRIPPING 6.00 C&C REAMING 1.50 SURVEYS Gas Cons. Commission SWE~.I~ ALASKA DAILY DRILLING REPORT ~-=. PAGE 1 OF 1 RT(', NAME PLATFORM "A" PROG. uEPTH 10705 9 MIDDLE GROUND SHOAL PRESENT DEPTH 10396 L~-a. SE PLATFORM "k" FOOTAGE DRILLED 100 WELL A14-01LND SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE 03/08~95 DIST. KB TO BHF 38.2 DAY 27 NLTA LTH/YTD / 0 EST. DAY 22 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 206 LAST BOP TEST 03/01/95 LAST CSG TEST 02/13/95 DRILLING FOREMAN: SELTZ RH /GALLOWAY DOYLE PRESENT ACTIVITY: ROTARY DRILLING AT 107396' SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 4.00 ROTARY DRILL FROM 10~254 TO 10321. 3.50 PUMP DRY JOB AND POH WITH BIT #12. .50 BNA / CHECK STABILIZERS~ CHANGE BIT? PICK UP PUMP OUT SUB. 3.00 TIH TO 4900' AND FILL DRIT,I.PIPE. 1.00 CUT AND SLIP 100' DRILLINGLINE. 1.00 RIH TO 107280' AND BREAK CIRCULATION. .50 ~D OUT OPEN HOLE FROM 107280 TO 10,321. 10.50 ROTARY DRILL FROM 107321 TO 107396'. NOTE: $117730 ADDED TO MGS 12-01 (AFE 707190) FOR 2 7/8" DRILLPIPE INSPECTION. BIT #12 IADC DULL GRADE - 6-7-BT-HM-F,I&2-1/16-BT/ER-PR/HR BHA INSPECTION (CUM. ROT HRS) PP1 · KILL SPEED PP2 ~ KILL SPEED 980 ~ 30 680 ~ 20 TIME (HRS) CUM. ROT. HRS 209.00 ROTATING 13.00 MUD MOTOR TRIPPING 8.50 C & C .50 REAMING 1.00 SURVEYS JET REPAIRS FISHING NIP UP/DOg~N /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BRA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 1.00 ~-~. .. -' SWEPI'ALASKA DAILY DRILLING REPORT PAGE I OF 1 RIG ~ ~L~FORM~,X%~£~r?~._-F~.0G. 0~ ~./~ I~=0S- ~._ ~ TO ~$. . ._. ~-16.0 ~ ~.OA~"~.- _ ~:'03/09/9S. . FIELD ~ ~ '... ~pLATFORM?~W:~ ...... .~.!~:~%:~$:~OOTAGE DRI?J..]~D.~ .... - 64:;~NLTA LTH/YTD" '- ~ '~ 0 EST. DAY . 22 ~.. ':~.~'~~f :~:~!~?'>'~:'~'' ......... :Sk'Z~ ~F'~'L~T'~CSG- ;~ 000'':'''' "L~'~L~H~Y~D':'"' ':'" /' -0 · DAYS +/ .... ' ' WORK 0 RD'~i!;7'07 i30~J';~ :?~!~? SIDE TRACK WATER DEPTH 80 LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 DRILLING FOREMAN: SELTZ RH ./GALLOWAY DOYLE BHA INSPECTION (CUM. ROT HRS) pRESEA?T ACTIVITY: ROTARY DRILLING. AT 10460' PP1% KILL SPEED 980 · 30 PP2 · KILL SPEED 680 · 20 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 8.00 ROTARY DRILL FROM 10396 TO 10460' 4.50 PUMPED DRY JOB AND POH WITH-BIT #13. WORKED TIGHT HOLE FROM.9942/9897. 5.50 PERFORMED WEEKLY BOP TEST. 3.50 RIH WITH BIT #14. FI~ PIPE AT 4960' AND 9090'.- TAGGED TIGHT SPOT AT 9861'. 2.00 REAMED FROM 9861' TO BOTTOM. APPEARED TO BE PUSHING PIECE"OF FORMATION (COAL) . BEGAN ROTARY DRILLING AT 10460' AT REPORT TIME. BIT CONDITION #13 - 6-8-RG-A-3/16-BT-PR CUM. ROT. HRS 217.00 "ROTATING ...... ;'--"8 ~'00 .... ' ....... MUD MOTOR. TRIPPING 8 . 50 C&C REAMING 2.00 SURVEYS REPAIRS FISHING "' ~ . ~IP UP/DOWN Isopl~ __ - . TESTING BOP /WH% .~7,.-, RUNNING C/~ING ' ... 5 .SO ..... ~-- CEMENTING PICKup/LAy DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION.~_-_?.-r';L_' SW~-- ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 R~" NAME PLATFORM "A' PROG. DEPTH 10705 ; ; MIDDLE GROUND SHOAL PRESENT DEPTH 10560 LEASE PLATFORM "A" FOOTAGE DRILLED 100 WELL A14-01LN'D SIZE OF LAST CSG 7.000 WORK ORDER 707130 DEP. OF LAST CSG 10016 SIDE TRACK WATER DEPTH 80 DRILLING FO~: SELTZ R/{ /GALLOWAY DOYLE PRESENT ACTIVITY: ROTARY DRILLING AT 10,560'. ~' SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 13.00 ROTARY DRILLED FROM 10460 TO 10553'. ELEVAT. KB TO MSL 116.0 DATE 03/10~95 DIST. KB TO BHF 38.2 DAY 29 NLTA LTH/YTD / 0 EST. DAY 2--2 LTA LTH/YTD / 0 DAYS +/- DAYS SINCE LAST LTA 208 LAST BOP TEST 03/08/95 LAST CSG TEST .02/13/95 BI-IA INSPECTION (CUM. ROT HRS) PPl ~ KILL SPEED 980 ~ 30 PP2 ~ KILL SPEED 1800 ~ 50 1.50 DRAGGING W~ILE PICKING UP OFF BOTTOM. POOH WET TO WINDOW. TIGHT OPEN HOLE FROM 9912 TO 9801'. 3.00 POOH WITH BIT #14. .50 ~/U BIT #15 AND CHECKED STABILIZERS. STABILIZERS O.K. 3.50 RIH WITH BI-IA. FILLED PIPE AT 4960 AND 9060'. 1.00 WORKED THROUGH TIGHT SPOT IN OPEN HOLE AT 9851'AND 10417'. SLOWLY WORKED DOWN A/qD TAGGED UP AT 10530'. .50 REAMED OPEN HOLE FROM 10530 TO 10553'. 1.00 ROTARY DRILLED FROM 10553 TO 10560'. BIT #14 - 6-8-RG-A-E-2/16-BT-PR NOTE: DAILY COSTS HIGH DUE TO TURBECO CASING CENTRILIZER CI{ARGES OF $10r300 A_ND /-JBOSCOPE PROD TBG CHARGE OF $5.000. TIME (HRS) CUM. ROT. HRS 231.00 ROTATING 14.00 MUD MOTOR TRIPPING 8.00 C&C REAMING 1.50 SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH __ TESTING BOP RUNNING CASING C~ING PICKUP/LAY DOWN DS INSPECT BHA .50 RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 IG NAME PLATFORM "A" PROG. DEPTH 10705 IELD MIDDLE GROUND SHOAL PRESENT DEPT~ 10618 EASE PLATFORM "A" FOOTAGE DRILLED 58 ELL A14-01LND SIZE OF LAST CSG 7.000 DRK ORDER 707130 DEP. OF LAST CSG 10016 [DE TRACK WATER DEPTH 80 ~ILLING FOREMAN: SELTZ RR /GALLOWAY DR P. ESENT ACTIVITY: RU SWS - TLC TOOLS ELEVAT. KB TO MSL 116.0 DATE 03/11/95 DIST. KB TO BHF 38.2 DAY 30 NLTA LTH/YTD / EST. DAY 22 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 209 LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 B~LA INSPECTION [CUM. ROT HRS) PP1 · KILL SPEED 980 ~ 30 __ PP2 · KILL SPEED 1800 ~ 50 __ D3qMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 2.00 ROTARY DRILLING FROM 10f553 TO 10f618'. [.-~ ~OH - TO wINDOw - TIGHT HOLE AT 10,335, 98~1, AND 9846'. RESPONDED TO FIRE ALARM *SEE NOTE. ~.00 SD FOR ~ENERATOR REPAIRS. [.50 ~H.AND TAGGED UP AT 10,618' FOR SHORT BIT TRIP. ~.00 PUMP DRY JOB AND POH WITH BHA. CIRC AT CSG WINDOW FOR 1 HOUR. [.00 RU SWS - TBG CONVEYED LOGGING TOOLS. NOTE/ FII~E ALJ%RM AT APPROX 19:10 DUE TO SHORT IN DC PANEL. ALL PERSONNEL RESPONDED ACCORDINGLY. TIME (HRS) CLTM. ROT. MRS ROTATING MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICkUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 243.00 12.00 10.0o 2.00 :G NAME PLATFORM "A" PROG. DEPTH 10705 :ELD MIDDLE GROUND SHOAL PRESENT DEP'I"H 10618 ~ASE PLATFORM "A" FOOTAGE DRILLED ~LL A14-01LNI) SIZE OF LAST CSG 7.000 )RK ORDER 707130 DEP. OF LA.ST CSG 10016 :DE TRACK WATER DEPTH 80 tIL~LING FOREMAN: SELTZ RH /GALLOWAY DR LESENT ACTIVITY: SERVICING RIG SWEPI ~KA DAILY DRILLING REPORT PAGE 1 OF 1 ELEVAT..KB TO MSL 116.0 DATE p3/12/95 DIST. KB TO BHF 38.2 DAY 31 NLTA LTH/YTD / EST. DAY 22 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 210 LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED 980 O 30 -' PP2 ~ KILL SPEED 1800 ~ 50 rMMARY OF OPER3%TIONS (SHOW HOURS FOR EACH OPERATION) : .50 HELD PRE-JOB SAFETY MEETING. RU SWS TRIPLE COMBO LOGGING TOOLS. TEST t.00 RIH WITH TBG CONVEYED L~ING TOOLS. CIRC /~ROUGH TOOL PORTS EVERY 15 STANDS. RIH SLOW TO 8569'. t.50 RU WL SHEAVE AND MY SIDE ENTRY SUB. t.00 RIH WITH WL, MU HEAD PIN i~/~D PACK OFF. ~.00 RIH SLOWLY AND LOG FROM 8584' TO 8569'. ~.00 POH L~ING FROM 10t612 TO 8569'. ~.00 RIH FOR REPEAT SECTION FROM 9609 TO 8569. ~.50 POH WITH WL. POH WITH TEG CONVE"fED TOOLS AND RD SWS. ~.00 ..50 MU BHA FOR C~EA_N OUT~ RU #1 BIT, ~ RIH. FILLED PIPE AT 4960 AND 9060 MU FIX)OR VALVE, CUT ~ SLIP 100' DRLG LINEr SERVICE TOP DRIVE, BLOCK~ AND DOLLY AND PIPE HA/gDLER. TIME (}{RS) CTJM. ROT. }{RS 243.00 ROTATING MLrD MOTOR /'RIPPING 16 . 50 C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/W}{ TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 7.50 G NA~ PLATFORM "A" PROG. DEPTH 10705 ELD MIDDLE GROLS~D SHOAL PRESENT DEP'i'H 10618 :ASE PLATFORM "A" FOOTAGE DRILLED :LL A14-01LND' SIZE OF LAST CSG 73000 ,RK ORDER 707130 DEP. OF LAST CSG 10016 DE TRACK ~ WATER DEPTH 80 .ILLING FOREMAN: SELTZ RH /GALLOWAY DR .ESENT ACTIVITY: RIH WITH CSG TO 10,590' ~4ARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : .50 CONT TO SERVICE RIG. .50 REPAIR BROKEN PIN IN SWIVAL BLOCK OF TOP DRIVE. SWEPI A~KA DAILY DRILLING REPORT PAGE 1 OF 1 EL~AT. KB TO MSL 116.0 DATE 03/13/95 DIST. KB TO BHF 38.2 DAY 32 NLTA LTH/Y'FD __/__ EST. DAY 2---~ LTA LTH/YTD / DAYS +/- -- DAYS SINCE LAST LTA 211 LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED 980 ~ 30 PP2 ~ KILL SPEED 1800 ~ 50 .00 RIH WITH BNA TO 10~520 - BRF~ CIRCLrLATION ANT) CIRC DOWN TO 10,618' MAKE UP CEMENT HEAD. RIH WITH B~uKER FLOAT SHOEt 1 JT 5" 18# L-80 CSG~ A_ND CIRC 200 STROKES. ~ POH TO ABOVE WINDOW AND CIROJLATE BOTTOMS UP. . 00 POH ~ BREAK DOWN BNA. .00 DOUBLE VALVE FLOAT COLLAR, 1 JT 5" CSG, I~ING COLLAR, 56 JTS 5" CSG, BAKER HYFLO III LINER F. ANGER WITH 7' TIE-BACK SLEE%rE ~ RUN ON 3.5" DRILL PIPE. FILL CSG WITH MUD EVERY 10 STDS. .00 CLEANED OUT PIT #6 WI4ILE INJECTING FLUID IN PIT 7. RIH WITH CSG TO !:~ .00 SD AT 9088' AND HELD PRE-JOB CEP[ENTING SAFETY MEETING. TIME (}{RS) C~3M. ROT. HRS ROTATING MUD MOTOR /'RIPPING C&C RF_~ING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEDING PICKUP/LAY DOWN DS INSPECT BNA RIG UP/TEAR DOWN WAIT ON WEAT/qER/MAT EVALUATION CORING OTHERS 243. O0 RECEIVED JUL 1 8 1995 AiaSk~ Oil & Gas Cons. Commission Anci]oa' -' SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 :G N;bV~E PLATFORM "A" PROG. DEPTt{ 10705 ELEVAT. KB TO MSL 116.0 DATE 03/14/95 :ELD MIDDLE GROUND SHOAL PRESENT DEi~ 10618 DIST. KB TO BI{F 38.2 DAY 33 -iASE PLATFORM "A" FOOTAGE DRII~ED NLTA LTH/YTD ~/~ EST. DAY 22 iLL A14-01LND SIZE OF IJtST CSG 7.000 LTA L/~4/YTD / DAYS +/- )RK ORDER 707130 DEP. OF LJtST CSG 10016 DAYS SINCE LAST LTA 212 iDE TRACK WATER DEI~ 80 LAST BOP TEST 03/08/95 L/tST CSG /'EST 02/13/95 '.ILLINGFOREMAN: SELTZ RI{ /GALLOWAY DR BI{A INSPECTION (C~3M. ROT HRS) 5ESENT ACTIVITY: ROTARY DRILLING CEMENT PP1 ~ KILL SPEED 980 · 30 '~ PP2 ~ KILL SPEED 1800 ~ 50 ~M/~ARY OF OPERATIONS (St{OW I{OURS FOR EACt{ OPERATION) : .00 RIH WITH CASING LINER. WORKED ~4ROUGH TIGI{T SPOT AT 9861'. RIH TO TIME (MRS) 10608'. CUM. ROT. }{RS 243.00 · 00 BREAK CIRCULATION AND CIRCU MUD TO CLEAN HOLE. ROTATING ~. 00 RU I{OWCO AND TEST LINES TO 2000#. MIXED AND CEMEiTrED LINER WITH 425 MUD MOTOR SXS ~S H CEMENT WITH .2% CFR3f HALAD .344L AND .15% MRS. PUMPED AT TRIPPING. RATE OF 2/5 BPMf AIR 5 BPM, AIP 2500#~ FLUSHED WIT~. 35 BBLS 14.3 MUD, C & C 25 BBLS 17# MUD AND 35 BBLS 14.3# MI/D. BUMPED PLUG AT 2600#. CIP AT REAMING · 1200 FIRS. SURVEYS ~ BLED OFF PSI A/ND POH WITH 25 STANDS OF DRILL PIPE. REVERSE CIRCT3-~TED JET 200 BBLS MT3D TO CLEAN HOLE. REPAIRS ~ PRESSURED CASING TO 1000# ~ SD 5 }{RSTO WOC FISHING . 00 POH WITH HANGER SE/TING TOOL NIP UP/DOWN /BOP/WH .00 MU BHA i~bND RII{. TAGGED CE~ STRINGS FROM 6353 TO 6437'. TESTING' BOP .00 ROTARY DRILL HARD CE~iE1T1r FROM 6437 TO 6740. RU1TNING CASING __ CEMENTING NOTE: TOL AT 8006.37'. LC AT 10516.32. SHOE AT 10612'. PICkUP/LAY DOWN DS INSPECT BNA __ __ NOTE: DAILY COST INCLUDES COST OF CASING~ LINER HANGERt AND CEMENTING. RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATI ON CORING SWEPI A~KA DAILY DRILLING REPORT RIG NAME PLATFORM "A" PROG. DEP'I/4 10705 FIELD MIDDLE GROUND SHOAL PRESENT DEPT~ 10618 LEASE PLATFORM "A" FOOTAGE DRILLED WELL A14-01LNI) SIZE OF I2%ST CSG 7.000 WORK ORDER 707130 DEP. OF I~T CSG 10016 SIDE TRACK WATER DEP'IS{ 80 DRILLING FORFJ~AN: WELLS R V /GAi/X)WAY DR PRESENT ACTIVITY: POI{ WITH BHA SU~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 20.00 ROTARY DRILL t{ARD CEMENT FROM 6740 o 6900. PAGE I OF 1 ELEVAT. KB TO MSL 116.0 DATE 03/15/95 DIST. KB TO BHF 38.2 DAY 34 NLTA LTH/Y/'D / EST. DAY 22 LTA LTH/YTD / DAYS +/- DAYS SINCE L;tST LTA 213 LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED 980 ~ 30 PP2 ~ KILL SPEED 1800 % 50 .50 FELL OUT OF HARD CEMENT AT 6900'. RIH AND TAGGED TOL AT 8000' BY DRILL TIME (MRS) CUM. ROT. ROTATING MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BNA RIG UP/TEAR DOWN WAIT ON WFJ%THER/MAT EVALUATION CORING OT~IERS PIPE MEASLrRF~. CIRCLTLATE HOLE CLF_JtN TEST LINER TOP TO 1000# - TESTED 3 TIMES - BLED OFF 75/100# EACH TEST. C~IECKED FLOW ~ PUMP DRY JOB - BEGAN TO POH WITH BIA%. NOTE: GAS ALJtRM SOUNDED AT 0200 DUE TO HIGH GAS CONTENT IN BAY #1. PRODUCTION OPS ACCESSED PROBLEM WITH BLOWING DOWN GAS FROM COMPRESSOR FOR RESTART. ALL RESPONDED WELL. 1.50 .50 1.50 243 . 00 IG NA3~E PLATFORM IELD MIDDLE GROUND SHOAL EASE PLATFORM "A" ELL A14-01LND ORK ORDER 707130 SWEP1 SKA DAILY DRILLING REPORT PROG. DEPTH 10705 ELEVAT. KB TO MSL 116.0 PRESENT DEP//4 10618 DIST. KB TO BHF 38.2 FOOTAGE DRILLED NLTA LTH/YTD __/__ SIZE OF LAST CSG 7.000 LTA LTH/YTD DEP. OF LAST CSG 10016 DAYS SINCE LAST LTA 214 PAGE 1 OF 1 DATE 03/16/95 DAY 35 EST. DAY 22 DAYS +/- 'IDE TRACK RILLING FOREMAN: WELLS R V RESENT ACTIVITY: POH WITH BFLA WATER DEPTH 80 /GA/./X)WAY DR UMI~Lz%Ry OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 4.00 CONT TO POH AND LAY DOWN BKA. 2.00 ~// BHA - 4 1/8 MILL 3.00 PICK UP 2 7/8 DRILLPIPE W/qILE RIH. 1.50 RIH WITH 3.5 DRILLPIPE. 1.00 CUT AND SLIP 100' DR~ LINE. 3.00 WORKED THROUGH TOP OF LINER AT 8006. LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT ERS) PP1% KILL SPEED 980 ~ 30 PP2 ~ KILL SPEED 1800 ~ 50 1.00 MAKE UP TOP DRIVE AND BREAK CIRCJLATION. WASHED DOWN TO 10409. TAGGED HARD CEMENT AT 10409. 6.50 ROTARY DRILLED HARD CEMENT FROM 10,409 TO 10,512 - LC. 1.00 CIRC HOLE CLEAN TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C&C RF~AMING SURVEYS REPAIRS FISHING NIP UP/DOWN /BO'P/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS .50 AT'I~EM~D TO TEST LINER LAP TO 1000# - LOST 100# IN 10 MIN. .50 CHECK FOR FLOW AND PUMP DRY JOB. BEGAN TO POH WITH BHA. 243.00 [G NAME PLATFORM "A" PROG. DEPT~ 10705 [ELD MIDDLE GROUND SHOAL PRESENT DEPT"H 10618 EASE PLATFORM "A" FOOTAGE DRILLED ELL A14-01LND SIZE OF LAST CSG 7.000 ORK ORDER 707130 DEP. OF LAST CSG 10016 IDE TRACK WATER DEPT}{ 80 RILLING FOREMAN: WELLS R V /GALLOWAY DR RESENT ACTIVITY: REV. CIRC HIGH VIS SWEEP SWEPI ~J.~%SKA DAILY DRILLING REPORT PAGE 1 OF 1 ELEVAT. KB TO MSL 116.0 DATE 03/17/95 DIST. KB TO BHF 38.2 DAY 36 NLTA LTH/YTD / EST. DAY 22 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 215 LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT }{RS) PP1 ~ KILL SPEED 980 ~ 30 PP2 ~ KILL SPEED 1800 % 50 ~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 3.00 CONT TO POH WITH BHA - LD BHA OF 4 1/8 MILL. 4.50 RU SWS - RIH AND RUN CBL FROM 9374 - 8000'. 2.50 ND PIC'IVJRE NIPPLE AND NU 5000# LUBRICATOR. 3.50 RU SWS - RIH AND RUN CBL FROM 9374 - 8000 WITH 1500# ON CASING. 2'.00 RD SWS, LUBRICATOR AND NU PICTURE NIPPLE. 2.50 MU BHA OF 5" A1TD 7" CASING SCRAPPERS. 2.00 RIH WITH SCRAPPERS AND TAG UP AT 10512'. 4.00 MU TOP DRIVE AND CIRCULATE AND CONDITION HOLE. CLEAN TANKS AND PREPARE HIGH VIS PILL. TIME (HRS) CUM. ROT. HRS ROTAT I NG MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/W~ TESTING BOP /W~ RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INS PEC'I' BMA RIG UP/TF_2%R DOWN WAIT ON WEAT]4ER/MAT EVALUATION CORING OTHERS 243.00 RECEIVED JUL ] 8 1995 At~S~ Oil & Gas Cons. Commission Anchor~je SWEPI ~..~SKA DAILY DRILLING REPORT [G NAME PLATFORM "A" PROG. DEPTH 10705 [ELD MIDDLE GROUND SHOAL PRESENT DEPTH 10618 .iASE PLATFORM "A" FOOTAGE DRILLED ~LL A14-01LND SIZE OF LAST CSG 7.000 )RK ORDER 707130 DEP. OF LAST CSG 10016 [DE TRACK WATER DEFTH 80 {ILLING FOREMAN: WELLS R V /GALLOWAY DR {ESENTACTIVITY: POH WITH BFLA . 3MPt~RY OF OPERATIONS (SHow HOURS FOR EACH OPERATION) : ;.00 REVERSE CIRC OIL BASED MUD OUT OF WELLBORE WITH FIW. PAGE 1 OF 1 ELEVAT. ~B TO MSL 116.0 DATE 03/18/95 DIST. KB TO BHF 38.2 DAY 37 NLTA LTH/YTD __/__ EST. DAY 22 LTA LTH/YTD / DAYS +/- DAYS SINCE I.~.5T LTA 216 LAST BOP TEST 03/08/9~ LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT }iRS) PPl ~ KILL SPEED 980 ~ 30 PP2 ~ KILL SPEED 1800 ~ 50 SD ARD CHECK FOR FLOW - TEST CASING FOR STATE AOGCC 'rEST TO 2000# - HELD OK FOR 30 MIN. ~.50 POH WITH 3.5 DRILL PIPE TO 2 7/8 X-OVER. L.00 CIRC BOTTOMS UP +50BBLS OF FIW ~.50 RIH WITH T;MN'DEM SCRAPPERS AND RETAG AT 10512'. ~.00 REVERSE CIR~TE 35 BBLS HIGH VIS SWEEP. CONVENTIONALLY CIRCULATED 10 BBL SWEEP, 10BBLS FIW~ 10 BBL SWEEP FOI_J~OWED BY FIW. WORKED ~ ROTATED PIPE. CIRC~TED CLEAN. CIRCULATED 2N'D SWEEP LIKE THE FIRST. ~.00 DISPLACED HOLE WITH 10 BBL HIGH VIS PILL FOLLOWED BY 330 BBLS DIESEL. 1.00 CHECK FLOW, PP~ DRY JOB~ AND POH WITH BHA. NOTE/ HIGH DAILY COSTS DUE TO EXTRA DIESEL USED AND COST OF CONDITIONING MT/D FROM A 12-01LN TO A 14-01LN. TIME (}{RS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH __ TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TF_2%R DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 243.00 SWEPI ALASKA DAILY DRILLING REPORT G NAME PLATFORM "A" ELD MIDDLE GROUND SHOAL :ASE PLATFORM "A" :LL A14-01LND )RK ORDER 707130 DE TRACK :ILLING FOREMAN: WELLS R V :ESENT ACTIVITY: RD SWS ~MMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : :.50 CONT. TO POH WITH BHA PROG. DEP/T{ 10705 PRESENT DEPTH 10618 FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 10016 WATER DEPTH 80 /GALLOWAY DR PAGE 1 OF 1 ELEVAT. KB TO MSL 116.0 DATE 03/19/95 DIST. K~ TO BHF 38.2 DAY 38 NLTA LTH/YTD / EST. DAY 22 LTA LTH/YTD __/.__ DAYS +/- DAYS SINCE LAST LTA 217 LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED 980 a 30 PP2 · KILL SPEED 1800 ~ 50 REMOVE WEAR RING A_ND CHANGE BOP ~ TO 2 7/8. TEST RAMS OK TO 5000#. ALSO TESTED TO LOW PSI OF 250#. RU EQUIP TO RIH WITH PROD EQUIPMENT. RAN BHA OF PERF GUNS AS FOLLOWS; (BUNS - 34J UJ RDX CHARGES 6 SHOTS PER FOOT 60 DEGREE PHASE) BOTTOM SHOT INDICATOR, GUNS, SAFETY SPACER, REDUNDENT FIRING HEAD, 1 JT 2 3/8~ PORTED DEBRIS SUB, 1 JT 2 3/8, OTIS XN NIPPLE, 1 JT 2 3/8, BAKER B/kLANCED SHOCK ABSORBER, BAKER FH PACKER, 1 JT 2 3/8, OTIS X NIPPLE, 1 JT 2 3/8, GI2~ #9, 1 JT 2 3/8, RA M~%RKER, 16 JTS 2 3/8, GLM #8, 14 JTS 2 3/8, 2 3/8 X 2 7/8 X-OVER, 5 JTS 2 7/8, GLM #7, 18 JTS 2 7/8, GLM #6, 18 JTS 2 7/8, GLM #5, 20 JTS 2 7/8, GLM #4, 32 JTS 2 7/8, GLM #3, 41 JTS 2 7/8, GLM #2, 52 JTS 2 7/8, GLM #1{ 54 JTS 2 7/8, BA/fER FV-6 SSSV WITH 8 JTS 2 7/8. RUWL (SWS) RIH WITH GR AND COLLAR LOCATOR AND TIED TBG CONVEYED GUNS INTO CORELATED 'LOGS. RD SWS. TIME (}{RS) CUM. ROT. HRS ROTATING PrOD MOTOR TRIPPING C&C ~ING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEt~I~TING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 243.00 RECEIVED JUL.i 8 19~5 Alaska Oil & Gas Cons. Commission Anchor~ -~ SWEPI A.LA,b._. DAILY DRILLING REPORT PAGE 1 OF 2 NAME PLATFORM "A" PROG. DEPTH 10705 D MIDDLE GROUND SHOAL PRESENT DEPTH 10618 E PLATFORM "A" FOOTAGE DRILLED A14-01LND SIZE OF LAST CSG 7.000 ORDER 707130 DEP. OF LAST CSG 10016 TRACK WATER DEPT~ 80 LING FOREMAN: WELLS R V /GALLOWAY DR ENT ACTIVITY: PREP TO MOVE RIG · . ~ ARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) 0 SPACE OUT PROD STRING TO TIE-IN LOG WITH 1.5' P~ANGER AND 6.1 PUP SUB. ELEVAT. KB TO MSL 116.0 DATE 03/20/9~ DIST. KB TO BHF 38.2 DAY 39 NLTA LTH/Y'IT) / EST. DAY 22 LTA LTH/YTD / DAYS +/- DAYS SINCE I~T LTA 218 LAST BOP TEST 03/08/95 LAST CSG TEST 02/13/9~ BHA INSPECTION (CUM. ROT }{RS) PP1 ~ KILL SPEED 980 ~ 30 PP2 ~ KILL SPEED 1800 ~ 50 DEPTHS OF PROD EQUIPMENT: BOTTOM SHAT AT 10312. TOP SHOT AT 9388.77. REDUNDANT FIRING HEAD AT 9154.81. PORTED DEBRIS SUB AT 9122.86. OTIS XN NIPPLE AT 9089.78. BAKER BALANCED SHOCK ABSORBER AT 9051.55. B;~CER F}{ PACKER AT 9037.73. OTIS X NIPPLE AT 9005.01. GLM 9 AT 8958.63 RA MARKER AT 8926.99. GLM 8 AT 8408.09. 2 3/8 X 2 7/8 X-OVER AT 7965. GLM 7 AT 7794. GLM 6 AT 7219.26. GLM 5 AT-6643.7. GLM 4 AT 5999.60. GLM 3 AT 4978.95. GLM 2 AT 3673.96. GLM 1 AT 2030.84. BA/fER FV-6 SSSV AT 318.82. TOTAL 2 3/8 - 36 JTS. TOTAL 2 7/8 - 249 d-TS. 95K DOWN WT 108K UP WEIGHT. 30K SHEAR ON PACKER. 9 BANDS ON CONTROL LINE FOR SSSV. RU SWS - RIH AND VERIFY TIE-IN. TIED IN CORRECTLY. RU SLICKLINE. RIH WIT}{ 1.875 XN TEST TOOL AND SET IN XN NIPPLE. PRESSURED tiP AND SET PACKER AT 1000#. TESTED PROD TBG TO 2000#. POH WITH TEST TOOL AND TD SLICKLINE. PULL LANDING JT, CLOSE SSSV, AND ND BOP'S. INSTALLED AND TESTED WELI2qEAD TO 5000#. HELD ON LOCATION SAFELY MEETING. OPEN SSSV. PRESSURED TBG UP TO 4100# TO ACTIVATE FIRING H~_2%D. BLED TO 0#. GUNS APPEARED TO HAVE SUCCESS- FULLY FIRED. WELL BEGkN TO FLOW WITH 125# TBG PSI. TURNED WELL OVER TO PRODUCTION. - BLEW DOWN WATER LINES AND PREPARED RIG FOR MOVE. CLEANED AND ORGAN. Wq{R 4. TIME (]{RS) CUM. ROT. HRS ROTATING FfUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEF[ENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 243.00 SWEPI ALASKA DAILY DRILLING REPORT ~AME PLATFORM "A" PROG. DEP'I/4 10705 ; MIDDLE GROUI';D SHOAL PRESENT DEPTH 10618 : PLATFORM "A" FOOTAGE DRILLED A14-01LND SIZE OF LAST CSG 7.000 ORDER 707130 DEP. OF LAST CSG 10016 TRACK WATER DEFTH 80 ,ING FOREMAN: WELLS R V /GALLOWAY DR :NT ACTIVITY: RIG RELEASED PAGE 1 OF 1 ELEVAT. KB TO MSL 116.0 DATE 03/21/95 DIST. KB TO BHF 38.2 DAY 40 NLTA LTH/YTD / EST. DAY 22 LTA LIlq/YTD __/__ DAYS +/- DAYS SINCE LAST LTA 219 __ LJ~ST BOP TEST 03/08/95 LAST CSG TEST 02/13/95 BHA INSPECTION (CUM. ROT }{RS) PP1 ~ KILL SPEED 980 ~ 30 PP2 ~ KILL SPEED 1800 ~ 50 ~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : PERFORMED NI3MEROUS REPAIRS TO RIG AND OPERATIONS TO PREPARE RIG FOR MOVE FROM A14-01LN TO A24-01LE. NOTE; RIG RELEASED FROM A3.4-01LN AT 1200 3/20/95. NOTE~ HIGH DAILY COSTS INCLUDE SWS PERF CHARGES OF $165,000 AND BAKER PACKER CHARGES OF $19,000. TIME (}{RS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C&C ~ING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /W~ RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT E VALUAT I O N CORING OTHERS 243.00 6.00 RECEIVED JUl '1 8 1995 Oil & Gas Cons. Commission SWEPI AI2%SKA DAILY DRILLING REPORT PAGE 2 OF 2 RIG NAME PLATFORM "A" DATE IQ3/20/95 WORK ORDER 707130 FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A14-01LND SIDE TRACK SUMMARY OF OPERATIONS CONTINI/E -- NOTE~ RECOGNITION TO SWEPI PERSONNEL BOBBY HA/)DOX A.N'D TO~4Y HENWOOD FOR THEIR HELP IN THE WELLHEAD INSTALLATION AND BRING THE WELL ON LINE Shell Western E&P Inc. An attgiat, of 8h~110~ Company , P. O. Box 576 Houston, TX 77001 - March 27, 1995 Mr. Larry Grant Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Grant: SUBJECT: LOG DATA FROM SWEPI MGS A-14-01LN, MIDDLE GROUND SHOAL FIELD, COOK INLET, ALASKA Enclosed please find the following log data from the SWEPI MGS A-14-01LN well in Middle Ground Shoal Field, Kenai Borough, Alaska (API# 50-733~20067-00): BLP Phasor Induction - Gamma Ray log BLP Lithodensity - Neutron - Gamma Ray log Sepia Phasor induction - Gamma Ray log Sepia Lithodensity -Gamma Ray log LIS tape DITE/LDT/CNL/GR Tape Listing DITE/LDT/CNL/GR List of Formation Tops Please sign one copy of this letter and return to me at the above address. Very truly yours, Maria A. Balzarini Senior Petrophysical Engineer Received RECEIVED ~aska 011 & ~as Con~, ~ Date: Anchorage March 27, 1995 Shell Western E&P Inc. An ~ of ~t~ll Ot~ Co~p~y P. O. Box 576 Houston, TX 77001 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Grant: FORMATION TOPS PICKS FOR THE SWEPI MGS A-14-01LN, MIDDLE GROUND SHOAL FIELD, KENAI BOROUGH, ALASKA Here is a list of formation tops encountered in the SWEPI MGS A-14-01LN (API# 50-733-20067-00), as required by the AOGCC. A-14-01LN (KB = 116') Approximate Formation Top MD TVD Subsea HE 9,278' 8,018' -7,902' I-IF 9,308' 8,037' -7,921' HI 9,388' 8,080' -7,964' HK 9,461' 8,106' -7,990' HN 9,871' 8,150' -8,034' HR 10,312' 8,195' -8,079' TD 10,618' 8,227' -8,111' If you have any questions, I can be reached at (713) 544-2389. Very truly yours, Maria A. Balzarini Senior Petrophysical Engineer MEMORAN .UM ?ate of Alaska Alaska Oil and Gas (.,~,,'tservafion Commission TO: DaVid Joh~n, DATE: March 9, 1995 Chairm~ THRU: Blair Wondzeli, P. I. Supervisor Jerry Herring, Petroleum Insp&~or FILE NO:. av3kchcd.doc FROM: SUBJECT: BOPE Test- Shell Plat. A Shell Western E&P Inc. MGS, A14-01-LN PTD ~ Wednesday~ _Ma. rch .8~ 1995: I traveled to Shell Platform A to witness a BOPE test. The BOPE Test Report is attached. · . _ The test began at 9i00PM and laSted for (4) hours. The BOP equipment teSted well, there was only one failure recorded. The inside BOP safety valve failed, was repaired and retested good. Jerome Dodge, Inlet Ddlling tool pusher, did an excellent job conducting the BOPE test. i found the Shell Platform A to be in good condition. While on board, ! completed the attached H2S Checklist. The gas detection equipment for the rig is integrated into the operations system. Both audial and visual alarms for methane and H2S are in service and are well maintained. lasted for (4) hours and there was one failure. . . . ?; Attachm aV3kch ,.~ i :~ ent: cd.xls ~ .... ~ _ sUmmery: i witnessed a succesSful BOPE test on Shell Platform A. The test STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Ddg Contractor: INLET DRILLING AK., INc. Operator: SHELL WESTERN E & P Well Name: MGS A14-0t Casing Size: 7" Set (f~ Test: Initial Weekly X ,. . DATE: ,, Rig No. A PTD # 94-263 Rig Ph.# Rep.: RICK SELTZ ,,. 10,016' Location: Sec. 11 T. 8N R. 13W Meridian SEWARD Other 3/8/95 776-5756 Rig Rep.: JEROME DODGE Test MlSC, INSPECTIONS: FLOOR SAFETY VALVES: Quan. Pressure P/F Location Gen.: OK Well Sign . OK Upper Kelly / IBOP 1 250\5000 P Housekeeping:., OK (Gen) Drl. Rig OK Lower Kelly / IBOP ... 1 250\5000 -P - Reserve Pit., N~ Ball Type 1 250\5000 P Inside BOP "'1 250\5000 F/P Test BOP STACK: Quan. Pressure P/F Test Annular Preventer 1 250\3500 P CHOKE MANIFOLD: Pressure P/F Pipe Rams 1 250/5000' ' P" No. Valves .. 13 ~ 250~5000 P Lower Pipe Rams ' N/A' N/A N/.~' No. Flanges 32 ] 250\5000 P Blind Rams r ..~ .. 25015000 P Manual Chokes "I '1 Functioned 'P Choke Ln. Valves 1. 250/5000 P Hydraulic Chokes 1 Functioned P_ i' , . HCR Valves 1 250/5000 P Kill Line Valves '3" 250/~000 "P ' ACCUMULATOR SYSTEM: , , , CheckValve -.-. 1._ ~ 250/5000. P System Pressure 2,900 I P Pressure After Closure 1,550 ! . P MUD SYSTEM: Visual Alarm 200 psi Attained After Closure 0 minutes 4.9- sec. ,, Tdp Tank P N/A System Pressure Attained 3 minutes 4 sec. Pit Level Indicators ' 'P P" Blind Switch Covers: Master: OK RemOte: OK Flow Indicator ' '~5' p' Nitgn. Btl's: Four Bottles~ ' Gas Detectors P ..... P" , ._ ,2.650 (.AVE,), .......Psig. Number of Failures: 1 ,Test Time: 4.0 Hours. Number of valves tested 22 Repair or Replacement of Failed Equipment wilt be made within 0 , ~l~ys. Notify the Inspector and follow with'W~tten or Faxed verification to the AOGCC Commission Office at:' Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 ' I I . II I [ I .. [ IIIII I . I _1 r II111 I I I ii I Iii i i_[ i_1 i i _.1 JI ii REMARKS: Inside @qp, ,saf, ety valve fe~?ed, was repaired an, d, re, tested good. ?xc.ellent test ,co,ndu, ~ed. by Jerome. ,Equ, i~, ,ent functioned we, il..,, Distribution: orig-Weli File c - Oper,/Rig c - Database c - Trip Rpt File c - Inspector "S~'ATE WITNES~'RE(~UIRED~)' YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: W~nessed By: F1-02t L (Rev. 7/t 9) AV3KCHCD.XLS SI '. WESTERN E. & P. INC. PIA~ "A" COMBUSTIBI~ GAS- TEST GAS - 2 1/2 % METHANE FhDW RATE - 2 LITERS PER MIN. - 56% LEL +- 2% ~ {{ % LEL {{ PASS SENSOR LOCATION HYDROGEN SULFIDE- ~UDIo AI~ TEST LOW AI~ SETTING WARNING HIGH AI~ SETTING AUDIO AI~ {{ % LEL % LEL ~=c?~=~. C33MPLETED BY P=PASS F=FAIL CIRCLE ONE SENSOR LOCATION ,, 20 PPM !, 50 PPM 100 PPM CAL CELl.nd~ SUB BASE ,~...{{'?O PPM ~ii PPM }{,, PPM i{ !I CET.IAR BELL NIPP~ ~Pm )1 PPM [ PPM ~{ {Alii)lO ~ TEST o., , WARNING PPM HiGH AI~ SE/TING [ 2._ AUU PPM SHze~ER ~ T~qC) i~...l PPM i{ PPM 11 PPM,{{ I TEST COMPLETED BY ~, zEo~ IS REQUIRED UNLESS RECAEIBRATING IS IN ORDER. * / ONLY 50 P~ ~ '~ ~ECK ~CAL) ONLY IF HIGH/~W CALIB~TION WAS NEEDED. FAILURES. REPAIRS AMPOUmmS i{ .... ~, ~ETHANE { T~PUSH~: September 27, 1994 A. J. Durrani Tech. Mgr. - Asset Admin. Shell Western E & P P O Box 576 (WCK 5237) Houston, TX 77001 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Re: Middle Ground Shoal A14-01LN Shell Western E & P Permit No: 94-119 Sur. Loc. Platf A, Leg 4, Cond 26, 1571'FSL, 381'FEL, Sll, T8N, R13W, SM Btmhole Loc. 10705'MD-KB: 1899'FSL, 4238'FEL, Si, T8N, R13W, SM Dear Mr. Durrani: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission at 279-1433. BY ORDER OF OMMI ION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. recycled papn, STATE OF ALASKA ALASKA O,- AND GAS CONSERVATION COMMISSION PERMIT TO DRILL' 20 AAC 25.005 la. Type of work D'till [] Redrill ~1 lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil Re-Entry ,m. Deepen[-11 Service [] Developement Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool SHELL WESTERN E&P INC. 116 KB feet MIDDLE GROUND SHOAL 3. Address 77001 6. Property Designation ~ "G" POOL P. O. BOX 576 (WCK 5237), HOUSTrlN,. TX APL 22r7-515 4. Location of well at surfacePLATF A., LEG 4, COND. 2(~ 7. Unit or property Name 11. Type BORd(see2OAAC25.025) 157:[' FSL,'. 38:[" FEL-S:[1,'T8N, R:[3W, S.M. MIDDLE GROUHD SHOAL BLANKET At top of productive ipt~:r~_l 8. Well nurpber Number 9:[00' HD-KB; 38:[ · & 4233" FEL S:[, A14-0:[LN 400 HM 7522 T8N, R13W. S.M. _At total depjh ._ 9. Approximate spud date Amount 10,705' FID-KB; :[899' FSL & 4238' FEL S:[' $200 000 TRN, RI-'qW': (:;.',Pi ' OCT. 30, 1994 · ' 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. ~P~rop/o~scd~epth,,o property line-u-/u3 J,lU 3381 feet :[:[00 feet 3746 8216 TVD. feet 16. To be completed for deviated wells 17. Anticipated. pressure (see 20 ,*AC 2S.035 · Kickoff depth 9100 feet Maximum hole angle 85 0 Maximumsud&ce 2130 o,,, ^, ,o,., ,.o,, ~, 5543 o,,~ 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight l Grade Coupling Length MD TVD MD 1-VD (include stage data) 6" 5" 18.O N80 FL4S _ 2705' 8000' .6981'10705.' 8216' 200 SX CLS G {;MT ,, 19. To be completed for Redrill, Re-entry, and Deepen Operations. REF. WELL N0. A14-01, AP]; Present well condition summaryRECEIVED Total depth: measured 10,016 feet Plugs (measured) true vertical 8699 feet Effective depth: measured 9918 feet Junk (measured) SEP 1 3 1994 true vertical 8610 feet Alaska 0ii & Gas Cons. C0mmissi0: Casing Length Size Cemented Measured depth ']~;h~rc~al depth Structural Conductor 33 0' 20" 330' 33 0' Surface 1761' 10-3/4" 1400 SX 1761 ' 1663' Intermediate Production 10.,016' 7" 1150 SX. 10,016' 8699' Liner Perforation depth: measured 8401' - 98,86' true vertical 7300' - 8582' 20. Attachments Filing fee ~ Property plat [~ BOP Sketch i~ Diverter Sketch ~ Drilling program ~ Drilling fluid program E~ Time vs depth plot [] Refraction analysis ~ Seabed report [] 20 AAC 25.050 requirements 21. I hereby certify that the foregoing is true and correc't to the best of my knowledge Signed 0../ ./~¢rX'¢), dX,~ ~ A. J. DURRANIcommissionTitle useTECH ' HGR. -Only ASSET ADMIN. Date9/08/94. Permit Number APl number I A p p~o v~a~;~d ~t e ~,~_~ I See cover letter y~//_//,///.~. 50-- ~,2,~,.~- 2- O O ~' 7"' ~'/ _~ ' for other requirements .. Conditions of approval Samples required ~ Yes ~ No Mud log required ~ Yes ~ No Hydrogen sulfide measures [] Yes ;~ No Directional survey required' ~ Yes ~ No Required working pressure for DOPE []2M; ~ 3M; ~, 5M; .~ 10M; -~ 15M Other: Original Signed By:: by order of Approved by David W. Johnston Commissioner the commission Date Shell Western E&P. Inc. Platform "A" Solids Control/Mud System Desilter 1 6 Co,ne Sand Derrick Shakers Derrick Shakers To Mu~p umps Trap To Mu~o umps To De~asser To De~asser IDegasser i© Mixers SFIELL WESTERN E&P INC. MIDDI. E GROUND SHOAL FIELD LI' 5 KSI LINES CIIOSS 3' X 3' X 3' X 3' 5 KSI CIIOSS 3' X 3' X 3' X 3' X 3' 5 3' 5 KSI GATE VALVE AD,IUSTABLE MANLJAL CI-iOKE - 3' 5 KSI REMOTE OPEFtATED CHOKE - 2-9/ 16° IOKSI HYDRAULIC ADJUSTABLE PflESStJRE GAGE 4' LINES MIlD/OAS SEPAIIATOR 6' l. INE PLATFORM "A" C~IOKE MANIFOLD INL £ T,~ VENTED A F CROw HOLE .5000 PSI STACH TOP OF DERRICK FLOOR BOITOM OF ROTARY BEAM FILL UP LINE RIG CELLAR FLOOR t,~EII'HEAD RO01~ FLOOR iDRILL i FLOW' LINE !NIPPLE ~,~ l/ RECEIVED PREWENTER I~ "qFO 13 1994 5000 PSI~"') ~oska u. 6 Gas Cons. Commission [ J, ~nchora~0 13-5/8" S000 PSI ~GE ,~, ~ h, B~ND ~ 5000 PSI ~ ~ PIPE ~ 5000 PSI ~GE D~ ~ 3-t/8" CHO~ ~ 5000 PSI RISER DSA 13-5/8' 5000 PSI FLANGE 13-5/8' 5000 PSI FLANGE 7 1/16' 5000 PSI FLANGE SPOOL SHELL MINIMUM BOP STACK REQUIREMENTS Min. Min. Item I.D. Nominal I Flowline 7" Fill up Line ...... ~" I qr!l!ing N i .P.,p_I e. Annular. P.r?venler _ . I Two single or one dual ~ydru~l'ically operated rams .... Drilling ~pool wilh 2" and 3" mia outlets . .. I Gat~ Valve 3 I/8" Gate Valve Power Operaled J i/8;' ' ...... J Line Iocho~e .m. anifold ..... 3" Gale Valve 2.1/16" C,he~.~. Yalve ..... 2' 1/1,6.' _ I Casing Spool Valves Gale 1.13/16" j' Compo.u.n.d Pres:,Ure Gauge cohnec'to} ......... iControl plucj or v'a'l~,a I.!3/16" . ~ I0 ,is muc~ pure;; ~'ar~i'foU ' 2" I~"x'2:'x 2-C,O,i - '_- Z]_.z_L-- ..... : Add,lional tueciliciljoni lot Au/Gas Service a~ g,v~n in SI,ell W~II Control Manull, Appendix 618. A tOlillA9 held Stllll Da pfo¥lded on Alii(iii S~l',,ILe OPTIONAL Wear ~lange or bore protector Gale valve Line to roadside connection Rotations blowout I~reventer Gate valve power operated DRAWING& CHECK LIST 104A SHELL CLASS 5M SURFACE INSTALLATIONS NORMAL AIR/GAS* FOR AIR/GAS DRILLING CONFIGURATION A .......... oo ANNUl_AR PREVENTER BLIND RAM / PIPE RAM , .i' ~4 1~:~? ~ROH ANADRILL · ~, ":'"SHELl-- MaCker Iden(if ication A) TIE-IN/KOP ~3/100 B) END OF CURVE~I C) S"fAglT 12,~100 CURVE~:2 O) .... TARGET.It .... E) ;END ¢ CURVE~2 F)~ .... TARGET¢2 G). TD MO 9t00 §5J8 lO09i 10i03 ~0103 20705 ~,0705 wESTER'~' "E i iii N/$ 4090 ~42>6 4428 ~430 4997 : t420 5009 1420 5O09 5609 1420 5609 1420 TO ~ 17135444194 P. El9 . . TNC ...... ' .... · .~,~. - i A14-O1LN (POi) PLAN VI.E~ CLOSURE ..... : 5786 feet at Azimuth ~4.21 DECLINATION,: 22.000 E SCALE ....... : ] inch : 1000 feel DRAWN ....... : 08/30/94 Anadri ] ] S£hlumberger · - ,,, ,,. ! .ki ..... - , i i --. 50q 0 500 tO00 1500 2000 2500 3000 3500 4000 4500 5000 5500 WEST ': EAST -> 6000 5500 : SHELL ~ESTERN IlE-fN/KO¢ 13/tO0 9~00 7~3 40~ 29,70 [ND OF CCVE~I ~8 8184 4428 83.95 ST~T 13/~00 CURVE~2 10091 8~64 4997 83.95 ....... TA~6T~I ........ tO-lO3 ...... 8~65- 5009- -85~4 ....... END OF ~RVEt2 ~0103 8165 5009 85. ~4 .... lA~ET¢2 .... le705 ~16 '5609 85. ~ TO ~0705 8216 5609 85.14 E &P ..... iN(j' Anadri ]] Schlumberger _ · 'At4-OiLN (P01) -' VERTICAL SECTION VIEW _ -. i i ii ii Section atl .... 0-]'~6 .................................................. IUD Scale.' ~ ~nch = 500 ~e~ Scale.- ~ 5nth = 500 ~ra~a ..... ' 08/30/~q C I C4 I -q 0 CD WF.'I..L LOCATION PLAT M;BDLE' GROUNI) SHOAl. FIE ^..PLATFORM COOK INLET, ALASKA Wl-LL; Ale--OlIN SURFACE LOCA-ION 15'7! FSI. 381 '-El $11 TOSN R15w KBE 116: MSt_ Ai4-O1LN TAROET/gHL ..... lO7O5 MO 821¢3 TVD '..899 F..,L 4238 FEL SEC 01 TOCN Fil.3W Sbl 2 TIF./IN / KOP ,.'qlOO MD 7883 TVD F,:, ~. 5.5 FEL 581 ~' 42 SE(]; :3~ TOCN .R~SW SM I i,52-1 \ / .~:\DE'N'.~HY:.I.\$~4ELPL~,'rNA" 4011 N.I'~(: 2 140 /AY'/4G I / ,,,/f / ,k~,l-: 4 .~ .0 ~/AS4- J 'IR~ ~ 1, ';J / /L."'t,i~12-C:le i/¢?-ct¢'~ I ! I. A15 ...... .3 A23, 12 13' RECEIVED S-EP 1 5 1994, Alaska Oil & Gas Cons. Commission Anchorage, : I (:' "~ \.~ ;ri L.-.me~)t~k.~;.'~'lJiJ :,/ .--~t%&Ll' .- _ . , AUCUS'r 30, 1~ TOTAL P, 03 MIDDLE GROUND SHOAL WELL NO. A14-01LN WELL PROGRAM Middle Ground Shoal (MGS) A14-01LN will be a redrill of existing well Al4-01. The objective is the lower Hemlock reservolro The well will be drilled directional out of the existing 7" casing through the Hemlock to a TVD of 8,216'. KOP will be at the top of the Hemlock. The well will be completed with a 5" cemented liner across the Hemlock reservoir. The existing perforations above the Hemlock will be shut off by cementing the 5" to 8,000'MD. Alaska Oit & Gas Cons. Commission Anchora~ WELL: LOCATION: OBJECTIVE: EVALUATION A14-O1LN PLATFORM A, LEG 4, CONDUCTOR 26 1,571'FSL 381'FEL Sll TO8N R13W SM HEMLOCK GEOLOGY DRILLING PROGNOSIS FIELD: KB: MIDDLE GROUND SHOAL 116' DRILLING LOGS MUD SIGNIFICANT LOGGERS FORMATIONS III MD (TVD) 330' 1,761' (1,663') iii II i~- I I HOLE SIZE CASING MUD DIRECTIONAL PROGRAM PROGRAM 20" I 10 3/4" 7II i DRILLPIPE CONVEYED LOGS AMS GR CNL LDT DITE MUDLOGGERS FROM KOP TO TD HEMLOCK HC HEMLOCK HD HEMLOCK HF HEMLOCK HK HEMLOCK HN HEMLOCK HR TD 8,000' (6,981') I I I I I 9,100' (7,883') -- 10,705' (8,216') k 6Im 5m! CEMENTED MINERAL BUILD & OIL BASE TURN TO MUD 85 DEG NOE EXPECTED MUD WEIGHT 13.0 PPG MIDDLE ~ROUND SHOAL A14-01LN DRILLING FLUID PROGRAM The 6" hole will be drilled using a mineral oil base mud. The anticipated mud weight is 13.0 ppg. EXPECTED PRESSURES The expected pressure gradien~ is 0.675 ~si/ft. The expected maximum bottom hole pressure IS 5,540 psi at 8,216'TVD. The expected maximum surface pressure with an oil fluid column and the well shut in is 2,130 psi. CASING PROGRAM A 6" hole will be drilled out of the existing 7" casing to TD. 5" 18#/ft N80 flushjoint liner will be run to TD and hung at approximately 8,000'MD. The production liner will be perforated using tubing conveyed guns. A RECEIVED SEP 1 S 199 Alaska Oil & Gas Cons· Commission Anchorage, 10. 11. DESCRIPTION SUMMARY OF PROPOSAL MIDDLE GROUND SHOAL A14-01LN 1. Move to Al4-01 (leg 4, conductor 26) and rig up. 2. Kill well. 3. Nipple up 5,000 psi BOP stack and test. 4. Pull tubing and packer completion equipment. 5. GIH with bit and scraper and clean out. 6. Set whipstock at 9,100'MD and sidetrack. 7. Directional drill to 10,705'MD-KB using a 6" hole. Final hole angle will be 85 degrees in a N0E direction. 8. Log. 9. Run a 5" production liner to TD and hang off at 8,000'MD-KB. Cement liner. (Liner will shut off existing perfs from 8,401'MD-KB to 8,845'MD-KB.) Perforate using tubing conveyed guns. Run packer and tubing. (Packer at approximately 9,000'MD.) Anad.ril 1 Schlumberger Alaska District llll East. 80th Avenue Allchorag'e, AK 99518 (907} 3,t9-4511 Fax 349-2487 DIRECTIONAL WELL PLAN for SHELL WESTERN E & P INC Well ......... : AZ4-01LN {P01) Field ........ : MID£,LE GROTj~, SHOAL Computation..: MIEIMUM CURVAEURE Units ........ : FB~T Surface Lat..,; 60,7.9563613 N Surface Long.: 15t.49558477 W LOCATIOI~S .- ALASY~ Zone; 4 Legal Description X-Coord Y-Coo. rd Surface ...... : 1571 FSL 385 FEL Sll T08N R13W SM 232835.50 2485787.72 Tie-in/KOP,,,: 38t FSL 4233 FEL S01 T08N R13W SM 234353.~8 2489844.58 Target ....... : 1299 FSL 4238 FEL S01 T0SN R13W SM 234369.23 2490762.97 BHL .......... : 5899 FSL 4228 FEL S01 T08N R13W SM 234382.91 2491362.80 PROPOSED WELL PROFILE c G-J I I Prepared ..... : 08/30/94 Section at...: 0.00 F~B elevation.: 116.~0 ft._ Magneti.c Dcln: 22.000 E Scal~ Fa.ctor~: 0.9~99.8.!22 Coil.vergemce..: -1.30 554432 RECEIVED .. S£P ] 3 1994 ataska Oil & Gas Cons. Commission Anchorage..,, STATION IDENTIFICATION TIE-IN/KOP 13/100 __ M~:~ INCLN DIRECTION VERT- DEPTHS SECT RELATIVE-COORDINATES DEPTH ANGLE 9100 29.70 9200 42.64 9300 55.61 9400 68.59 9500 81.57 STATE-PLA}]E AZIMUTH BKB SUB-S DIST FROM-THE-WELL~E~ X Y 3,98 7883 7767 4090 4090,49 N 1425,68 E 234353,98 2489844.58 1.98 7964 7848 4149 4149,30 N 1428.58 E 234358,22 2489903,31 0,77 8029 7913 4225 4224.73 N 1430.31 E 234361.67 2489978.69 359~89 8~75 7959 4313 4312,92 N 1430.78 E 234364,15 2490066,84 359,16 8101 7985 4409 4409,34 N 1429,97 E 234365.53 2490163.25 TOOn D~/ FACE 10 0 6L <TIE 4L 13.00 4L 13.00 3L 13.00 3L 13,.00 END OF CURVE#i 9518 83,95 10000 83.95 START 13/100 CURVE#2 10091 83.95 ].0100 84.82 TARGET~I .... 10103 85.14 359,04 8104 7988 4428 4427.53 N 1429.68 ~ 234365.66 2490181.44 359,04 8154 8038 4906 4906.44 N 1421.63 E 234368.52 2490660,40 0.00 359,04 8164 8048 4997 4997.30 N 1420,10 E 234369.07 2490751.27 39R 0.00 359.74 8165 8049 5006 5005.87 N 1420.01 E 234369.17 2490759.84 39L 13.00 0.0.0 8165 804-9 .5009 5009.00 N 1420.00 .E 234369..23 2.490762.97 L3~-00.. END OF CURVE~2 TARGET# 2 .... TD 10103 85.14 10705 85.14 10705 85.14 0.00 8165 8049 5009 5009,00 N 1420,00 E 234369.23 2490762.97 O.OO 8216 8100 5609 5609.00 N 1420.00 E 234382.91 2491362.80 0.OO 8216 8100 5609 5609.00 N 1420.00 E 234382.91 2491362,80 0.00 O'.-UO {Anadril (c}94 Af40LLN1 B1.52 10:54 AM 1) ALASKA OIL AND GAS CONSERVATION COMMISSION September 14, 1994 WALTER J. HiCKEL, GOVERNOR · -., , 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 44.60 Re: The application of Shell Western E&P Inc. to drill, complete and produce the Middle Ground Shoal No. A14-01LN well in the Middle Ground Shoal Field. A. J. Durrani Technical Manager Alaska Engineering/Asset Administration Shell Western E&P Inc. P. O. Box 576 Houston, Tx. 77001 Dear Mr. Durrani: The referenced application was received on September 13, 1994. The Mid~tle Ground Shoal No. A14-01LN well is to be drilled to the steeply dipping west flank of the reservoir. Structural complexities in this portion of the field require producers to. be drilled at less than 80-acre spacing to insure adequate drainage. The subject well will be the fourth producer in the southwest quarter of section 1, T8N, R13W SM. The Alaska Oil and Gas Conservation Commission has reviewed the evidence available and hereby authorizes the drilling, completion and production of the referenced well pursuant'to Rule 6 of Conservation Order No. 44. Sincerely, Russell A. Douglass Commissioner BY ORDER OF THE COMMISSION APPLICATION FOR SUNDRY APdROVALS J !1 It 11:14RH SNEPI HOU 713 544 L4;.dld4F~'-"_'' '' '? r.,4/~ Sl.ATEO~'Ai. AS~Ott~ T0 t0-40! FOR HELL #A14-0]LN _ 2, Name ~ O~rat~ & Ty~ or Well; SHELL WESTERN E&P INC, &~mm P..0..BOX 576 (WCK 5237) HOUSTON, TX 77001,-0576 4.~i~.~a~sud,~ PLA~ A, LEG 4, COND 26 8. WellnUm~r I571' FSL & 381' FEL S[1, TSN, R13W, S.M A14-01 mtop~p~ti~inte~f ~ 8401': 30' N & 979' E OF SW COR~ER 51, 9, Permiinum~r T8N, 'R13W, S.M. 67-79 N e,e~i~ depth Nto~ldeplh ~ 10,083': 818' N & 1018' E OF SW CORNER S1 TSN, R13W, 12. Pre~nt ~1t ~ition su~w To~l depth; measured 1 O, 016 lee[ Pluo$ (measure) Irue ~ 8699 leer Effective dep4h: measured 9918 feet Junk(measured) true verti~l 8610 leal 6, Datum elevation (DF or KB) 116 KB I~el Z Unit of Procerty name .MIDDLE GROUND SHOAL '~0. ,APl ¢_u~n_ bar $0_733-20067-00 11. Field~oOI HG_S /__[. F.& 6 POOL , Size Cemented Measured depth True vea~cal depth Casing Lenoth Structural Con~lu~or 33 O' s.u~ace 1761' Intermediate ProductiOn 1 O, 016' Liner Ped'oralion depth: measured lrue vertical Tubing (Cze, grade, and measured depth) PaCkers arid S,,~k.~/(type and mea-*ured de~th) 20" 330' 330' 10-3/4': 1400 SX 1761' 1663' RECEIVed 8401' - 9886' S EP 23 1994 7300' - 8582' ,.o: Alfl,_Ski~ u,, .., · ' ............ 3-1/2", 9.2# & 9.3//, J-55 & N-80, EUE 8rda'~'~'fl~e¢8268 Baker "HB" Pkr @ 8199' & Baker "FV6" SSSV @ 321' Oe~,riptlon summary of proposa~ X 13. Attachmenm 14. E~n'~ted date for commencing operation 10/30/94 16, I1 propose wes verbally approved BOP ~k~{C~ _ Name of aCprover Date approved Service , 1Z I hereby certify' ~hat ~e foregoing ~ true and ~rr~l to the ~S~ of my ~edg~ ' ' '~ - -- ~OR ~MMISSION US¢ON LY C~i~io~ ol appr~k N~ ~is~o~ so re~e~n~li~ may ~me~ Plug integr~y ~ BOP Test __ ~tion ~eara~e M~~ I~egrity ~ ~ Su~quen[ lotto requir~ ~ ~ o~ approveO IW order of the COmmission Original Signed By Oavid W_ .Joh.n_st_n_n_ - 43 - ~,op,'oved Copy Returned ?- Status of weft dassiF~r_,ation as: Oil ~ Gas __ SuSpended __ Commissioner ORIGINAL [:)at. 9/23/94 Date 2,,/x:'Z-.3/'P ti' SUBMIT IN TRIPLICATE Form 10,403 Rev 0~/15/88 G WELL PERMIT CHECKLIST G~.OL ~ ~'-2_ <~ U~TT# PROGRAM: exp [] dev [] redrll~ serv [] ADMINISTRATION 1. Permit fee attached ................... fY/ N 2. Lease number appropriate ................ 3. Unique well name and number ............... ~ N 4. Well located in a defined pool ............. ~ N 5. Well located proper distance from drlg unit boundary...~ N 6. Well located proper distance from other wells ..... ~,~N~ 7. Sufficient acreage available in drilling unit ...... Y 8. If deviated, is wellbore plat included ......... ~ N 9. Operator only affected party .............. ~ N 10. Operator has appropriate bond in force ......... ~ N 11. Permit can be issued without conservation order ..... 12. Permit can be issued without administrative approval...Y 13. Can permit be approved before 15-day wait ....... N ENGINEERING GEOLOGY APPR 14. Conductor string provided ................ Y 15. Surface casing protects all known USDWs ......... Y 16. CMT vol adequate to circulate on conductor & surf csg.. Y 17. CMT vol adequate to tie-in long string to surf csg . . . Y 18. CMT will cover all known productive horizons ....... ~ 19. Casing designs adequate for C, T, B & permafrost .... ~ 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndnmnt been approved..Y 22. Adequate wellbore separation proposed .......... ~ 23. If diverter required, is it adequate .......... ;Y 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate ..................... ~ N 26. BOPE press rating adequate; test to'~ ~~)~ psig.~ N 27. Choke manifold complies w/API RP-53 (May 84) ...... ~ N 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of ~2S gas probable ............. Y ~ N N N 30. Permit can be issued w/o hydrogen sulfide measures .... Y N/ 31. Data presented on potential overpressur~ zones ..... Y/~ 32. Seismic analysis 9f shallow gas zones .......... V N 33. Seabed condition survey (if off-shore) ........ ~/~ N 34. Contact name/phone for weekly progress reports . . . ./. Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments / Instructions: TAB HOW/jo - A:~FORMS~cheklist rev 03/94 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simp!ify finding information, informati;3n of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. **** DLIS' SCAN **** Scan information from - /dev/rm%/%ape625g ~ell number ts - 48 LIS TAPE Ftle sequence number: ! Frame fnformatton FRAME ID INDEX-TYPE DIRECTION SPACING BOREHOLE DEPTH Decreasln -6~. (.lIN) [13,~,1] Nu~nber of'Channels 171 CHAHNELS .. [13,~,INDEX] [13,~,BS] [13,D,TOD] [13,N,TIME] £13,m,ETIM] [13,~,CS] .. [13,~,DIFF] [13,D,TENS] £13,~,MARK] " [13,~,RCAL] [13,~,CALI] [13,N,IHV] [13,~,ICV] : £13,.~,SHVD] [13,I,LHVD] [13,I,~LLL] .[13,N,~I. LU] [13.,D,RLUL] [13~,RI..UU] [13,~,RSLL] £13,~,RSLU? [13,~,~SUL] [13,.~,RSUU] .." [13,~,SP] [13,E,SPMV] [13,~,LI.] · [13,g,L.~] E13,fr,t ITH] [13,~,SS1] [13,~,SS2] [13~,?ARI] [t3,~LSHV] [13~9,FFSS? [ 13 ,~, F: FLS: ] [ ~ 3 .~, SI.U] INDEX-MIN(FT) FIRST FRAME INDEX-MAX(FT) LAST FRAME 9658.~ 1 8868.5~ 158~ UNITS DIMENSION NUMBER OF ELEMENTS IrED .lIN 1 ,. RECE 1 S 1 1 s"s NIAR13 1 1995 ~1 F/I4R 1 1 L B F N~ 011 & 1 F ~.or.ve 1 IN 1 1 IN 1 1 F3 I 1 F3 I 1 V 1 V I 1 CPS 1 l CPS -1 1 CPS 1 1 CPS 1 .. 1 CPS 1 CPS 1 1 CPS I 1 CPS 1 1 MV 1 1 MV 1 1 CPS 1 1 CPS 1 1 ,CPS 1 1 .,, I 1 C P'S 1 1 CPS 1 1 1 1 V I 1 V l 1 1 I i 1 CPS 1 1 CP ~.' 1 ' 1 CPi: l I OF7ff CPS CP~-, CPS G/C3 GIC3 GIC3 GIC3 GtL:3 G/r: 3 G/C3 VtV CPS CF.'..' C PS CPS V/V V/V V/V IN IN MM/M MM/M MM/M MM/M MM/M MM/M MM/M MM/M MM/M MHIM lqHIM Mr.1/M M H/M MM/M HH/H Ml41H MM/M. M M / ;,1 MV MV NV MA MA MA HH/H MA MA MA V V 1 1 1 1 1 1 1 1 I 1 I 1 ! ]. 1 i 1 1 1 1 I 1 1 1 1 1 ! 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ! 1 1 1 1 1 ! ! 1 1 1 1 I 1 1 1 1 1 £13.1 ~RXFO] [ 13,1 .XFOC] ~i~ [13,1~RSPR] [ 13,~J,SPAZ] [ 13 .It,SPAP ] [13.el. RITE] [ 13 [1.'3 [ 13. [ 13,0, F TVZ] [ 13,.tT,RPSB] [ 13,0', EPSD] [ 13 ,.9, ;.'.P SD ] [13,.c],IPSD] ' [ 13,D', !RMA] [13,t~,?IRP] [ 13,1, II~OA] [ 13,.q',2IXP] [13,1,\/~DC] . [13,0,1WF1] [ 13,1 , IWF2] [ 13,1 , INDB] [ 13,.~, 15VT] [ 13 ,~, 25VT] [ 13,8r,S2IV] ,,[ 13 ,II, 15V$] · ~ [13,1,DECL] .. [ 13,.~I, DECS] [ 13 ;if, DERS] [ 13,1 , IFRE] [ 13,~r, IFBA] [ 13 ,.~r, ~PBA] [13, !. ,CIDP ] [13,1,CIMP] [ 13 ,.~f, IDPH] [13,1, IM?H] ' [ 13,.~, IIRD] [13,,~, I IXD] [ 13,1, I IRH] [13,2, IIXM] [13,t)', I×I)] [13,I,!X?J] [ 13,1 ,C!LD] [ 13,2,CILM] '.' [13,1,tLD) [ 13 , 2 , "[ 13 [13, [ 13, I ,~FV] [ 13 ,.~Y, S;FC ] .,FL ] [ 13, ~", C.q FA ] [ 13,1 , '~:[: LU] [ 1°,:, ,t~,SFLA] [:IS,g, IT[".M] [ 13,2.,RHCX] [ 1'3,2 ,;'.GF,I ] [ 13 [ 1 3., 1 , ':;'['.ga ] [ i3 [ 1S, [ I 3, ~7. ,.'IP, E ~; ] ,,,] EM ] [~o,.~,~,,..c ' V V MV MV MV DEGF V V V V MM/M MM/M OItMM OHMM MM/M MM/M MM/H MI4/M OHHM OHM:i MM/M H I,'i / M OHMM MA liA H H / M ;.1 / Olil.i?-] D [] C a / f: 3 GAP I G A P 'il .LBF L~'F 0~.!~ DJ;CF 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 ' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 ,, 1 I 1 1 1 1 1 1 1 1 1 1 1 1- 1 1 I 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 · ! ' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ?'I '.' 1 'i .. ;,i'/ 1 ~oqgence nu:':~ber: 1 I~format ton I NBEX-~AX( FT} LAST FRAME ......................................... .... DEPTH Decreastn -Z~. 9658.323 I (. i IN ) ~8~.5f~'.~ 474~ Numb~,r oi': [:hanr:els S NUMBER OF ELEMENTS Frame Information ' FP, AHE ID IRDEX-TYPE DIRECTION SPACING INDEX-MIN(FT) FIRST FRAME I NDEX-;4AX (FT) LAST FP, AME · [38,~,1] BC1REHOL. E DEPTH Decreastn -G~. 18655.5~ 1 (.lIN) 85D.~.N~,E ' 4312 Numbar of Channels 171 CHAHNE~ S UNITS DIME NSION NUMBER OF ELEMENTS [38,~,lNDEX] .lin 1 [38.8,BS] IN 1 [38...(~,'I'OD] S 1 [38,~,TIHE] MS 1 [38,~,CS] F/HR 1 [38,~,DIFF} F 1 [38,~,'FENS] LBF 1 [38,~,HARK] F 1 [38,~,RCAl.] IN 1 [38,~,CALI] IN 1 [38,D,ItiV] F3 1 [38,.0, ICV] F3 1 [ 38 ~ fi, SItVD ] V 1 [38,1.I. HVD] V 1 [38,1 ,RI. LL ] CPS 1 [3~, ,~,RLLU] CPS 1 [38,/T,RLUL ] CPS 1 [ 38 ,~,F L UU ] CPS l [38,.~,RSLL] CPS 1 [ 38,.(I,RSI. U ] CPS 1 [ 3~,O,FSUL ] CPS 1 [38,9',RSUU] CPS 1 [38,~,SP] MV 1 [38,.~,SPMV] MV 1 [2O..D,LL] CPS 1 [38~0,l.U] _ CPS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ' 1 1 1 1 1 1 1 1 1 1 1 1.' 1 CPS cPS CPS CPS CPS Ct~ CPS CPS CPS CPS G/C3 G/C3 G/C3 G/C3 G/C3 G/C3 G/C3 V/V CPS CPS CPS CPS V/V V/V V/V IN IN MM/M MM/M MH/H MH/M MM/H MM/H MH/M MH/;.I MH/M MM/f: M ~ / M MH / H M; i 1 1'4 >1 / MV 1 1 1 1 1 1 1 1 1 1 ' 1 t 1 1 1 1 1 1 1 I 1 1 1 I 1 1 1 i I 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1' 1 1 _ I 1 1 1 1 1 1 1 1 ] 1 ,1 1 1 1 1 ... E38,.~,SFVP3 [ 9F .3, :.-.I'VZ ] ['~::.1 ,~I'CP] [: :~,. ,' ~'SF~ [ 30 ..'.,', ?~ BP .~ [ St~ ,.'; ,: t'OC~ [78,1,'<FOC] [38,r;,SPAP3 [38,~,RITE] [38,~,DIHV] [38,~,FTVP] [38,~,FTVZ] ' £38,8, IPSD] £38,~,IEHA] £38,~,2IRP3 : [38,1,IRDA] £.38,~.2IXP] £38,1,V~DC] £38,8, IWF1] £38,1,I~F2] [38,1,INDB] ..£38,~,15VT] £38,N,S2IV] £38,N,15VS] £38,1,DECL] [38,~,DEC$] £38,~,DERS] £38,1,IFRE3 [38,~,IFBA3 '- £~8,~,IPBA] " [38,1,CIDP] £2O,I,CIMP] £38,~,IDPH] £38,1,IHPH] [38,~,IIRD] £38,~,IIXD] .E38,1,IIRM] £38,2,IIXM3 [38,~,IXD] [38,1,CILD] £38,2,CILH3 [38,1,ILD] [38,~,ILM] [38,2,DHRA] £38,~,QI.RA] £38,~,SFB] · [38,1,SFV] £38,~,SFC] .£38,1,CSFL3 MV M',/ t.i.;'.. H, MA Mt,JIM }4 A hi."', V V V V MV MV DEGF V V V V MM/M MM/M OHMM OHMM MM/M MH/M MM/M MM/M OHMM OHMM MM/M MM/M 0 I-{ i.i,'4 OHHN NV HA HH/H 1 1 1 1 1 1 ! 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 t 1 1 1 1 ! 1 1 I 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1' 1 1 1 1 1 1 1 1 1 1 1 ,CSFA] H~,~iM 1 1 , ~'F L U ] 0 'A HM I 1 ";'S F LA ] 0!: I",M 1 1 , ITEM] DEGF 1 1 ,RHGX] G/C3 1 1 , RGR ] GAP I 1 1 , GR ] GAP I 1 1 , S'FSG ] 1 1 ,HTEN] LBF 1 1 ,RHTE] LBF 1 z , MP. ES] OHMM 1 1 , !Il'EM ] DEGF 1 1 ,/',HTE ] DEGF 1 1 , DTt-:M ] DC/,v. 1 1 ,.--,PA] MV 1 1 , RSP ] MV 1 1 sequence number Fral~e Information IN~EX-TYPE INDEX-MAX(FT) LAST FRAME -,3] BOREHOLE DEPTH Decreastn -ZN. 18655.833 1 [.liN) 85~.~ 12936 ~r of Channels 5 . )ELS UNITS DIMENSION NUMBER OF ELEMENTS , INDEX] .1 IN 1 1 ',RSHI ] OHHM ! , RSMN ] OHMM 1 1 ;, BHI N ] OHMM 1 1 , BMNO] OHMM 1 1 Files on thl~ storage unit are: File sequence number: ! File id : TOH .NN7 File ~equence number: 2 File id : TOH .~4